Sample records for ec funded project

  1. Empowering patients through eHealth: a case report of a pan-European project.

    PubMed

    Lettieri, Emanuele; Fumagalli, Lia P; Radaelli, Giovanni; Bertele', Paolo; Vogt, Jess; Hammerschmidt, Reinhard; Lara, Juan L; Carriazo, Ana; Masella, Cristina

    2015-08-05

    This paper crystallises the experience developed by the pan-European PALANTE Consortium in dealing with the generation of relevant evidence from heterogeneous eHealth services for patient empowerment in nine European Regions. The European Commission (EC) recently funded a number of pan-European eHealth projects aimed at empowering European patients/citizens thus transforming the traditional patient/citizen role in the management of their health (e.g., PALANTE, SUSTAIN, CARRE, HeartCycle, Empower). However, the heterogeneity of the healthcare systems, of the implemented services and of the target patients, the use of ad-hoc definitions of the salient concepts and the development of small-size experiences have prevented the dissemination of "global" results and the development of cumulative knowledge. The main challenge has been the generation of large-scale evidence from heterogeneous small-size experiences. Three lessons have been collectively learnt during the development of the PALANTE project, which involves 9 sites that have implemented different eHealth services for empowering different typologies of patients. These lessons have been refined progressively through project meetings, reviews with the EC Project Officer and Reviewers. The paper illustrates the ten steps followed to develop the three lessons. The first lesson learnt is about how EC-funded projects should develop cumulative knowledge by avoiding self-crafted measures of outcome and by adopting literature-grounded definitions and scales. The second lesson learnt is about how EC-funded projects should identify ambitious, cross-pilot policy and research questions that allow pooling of data from across heterogeneous experiences even if a multi-centre study design was not agreed before. The third lesson learnt is about how EC-funded projects should open their collections of data and make them freely-accessible to the scientific community shortly after the conclusion of the project in order to guarantee the replicability of results and conclusions. The three lessons might provide original elements for fuelling the ongoing debate about the capability of the EC to develop evidence-based policies by pooling evidence from heterogeneous, local experiences.

  2. Achievements and bottlenecks in humanitarian demining EU-funded research: final results from the EC DELVE project

    NASA Astrophysics Data System (ADS)

    Sahli, Hichem; Bruschini, Claudio; Van Kempen, Luc; Schleijpen, Ric; den Breejen, Eric

    2008-04-01

    The EC DELVE Support Action project has analyzed the bottlenecks in the transfer of Humanitarian Demining (HD) technology from technology development to the use in the field, and drawn some lessons learned, basing itself on the assessment of the European Humanitarian Demining Research and Technology Development (RTD) situation from early 1990 until 2006. The situation at the European level was analyzed with emphasis on activities sponsored by the European Commission (EC). This was also done for four European countries and Japan, with emphasis on national activities. The developments in HD during the last 10 years underline the fact that in a number of cases demining related developments have been terminated or at least put on hold. The study also showed that the funding provided by the EC under the Framework Program for RTD has led directly to the creation of an extensive portfolio of Humanitarian Demining technology development projects. The latter provided a range of research and supporting measures addressing the critical issues identified as a result of the regulatory policies developed in the field of Humanitarian Demining over the last ten years. However, the range of instruments available to the EC to finance the necessary research and development were limited, to pre-competitive research. The EC had no tools or programs to directly fund actual product development. As a first consequence, the EC funding program for development of technology for Humanitarian Demining unfortunately proved to be largely unsuitable for the small-scale development needed in a field where there is only a very limited market. As a second consequence, most of the research has been demonstrator-oriented. Moreover, the timeframe for RTD in Humanitarian Demining has not been sufficiently synchronized with the timeframe of the EC policies and regulations. The separation of the Mine Action and RTD funding streams in the EC did also negatively affect the take-up of new technologies. As a conclusion, creating coherence between: (1) the EC policy based on political decisions, (2) RTD, testing and industrialization of equipment, and (3) timely deployment, requires a new way of coordinated thinking: "end-to-end planning" has to be supported by a well organized and coordinated organizational structure involving different DGs and even extending beyond the EU. This was not the case for Mine Action, but appears today to be the case for Environmental Risk Management.

  3. Evaluation results for intelligent transportation systems

    DOT National Transportation Integrated Search

    2000-11-09

    This presentation covers the methods of evaluation set out for EC-funded ITS research and demonstration projects, known as the CONVERGE validation quality process and the lessons learned from that approach. The new approach to appraisal, which is bei...

  4. Evaluation results for intelligent transport systems (ITS) : abstract

    DOT National Transportation Integrated Search

    2000-11-09

    This paper summarizes the methods of evaluation set out for EC-funded ITS research and demonstration projects, known as the CONVERGE validation quality process and the lessons learned from that approach. The new approach to appraisal, which is being ...

  5. Beyond robotics: a new proactive research initiative from the EU IST program.

    PubMed

    Karp, Pekka

    2005-01-01

    A research initiative on embodied artificial intelligence has been launched in 2004 by the Future and Emerging Technologies (FET) arm of the Information Society Technologies (IST) programme of the European Union. The initiative is called "Beyond Robotics" to emphasize that the research projects funded are required to set ambitious objectives and to aim at breakthroughs going well beyond the state of the art. Four projects worth 20 M E of EC funding were selected for 2004-2008 to address the objectives of the initiative.

  6. Lessons learnt from Volcanoes' Night I-II-III - a Marie Curie Researchers' Night project series dedicated to geosciences

    NASA Astrophysics Data System (ADS)

    Cseko, Adrienn; Bodo, Balazs; Ortega Rodriguez, Ariadna

    2017-04-01

    European Researchers' Nights (ERNs) are a pan-European series of events funded by the European Commission, organised on the last Friday of every September since 2005. ERNs mobilise scientific, academic and research organisations with the aim of giving the public the opportunity to meet researchers in an informal setting. The overall objective of ERNs is to achieve better awareness among the general public concerning the importance of science in everyday life and to combat stereotypes about researchers. The longer-term strategic objective of ERNs is to encourage young people to embark on a scientific career. Volcanoes' Night I-II-III has been an ERN project series funded by the EC FP7 and H2020 programmes between 2012-2015 (EC contract No. 316558, 610050, 633310, www.nochedevolcanes.es). The concept of Volcanoes' Night was created by researchers from the Canary Islands, Spain, where both the researchers and the public live in the close vicinity of volcanoes. The objective of the project was to use volcanoes as a background against which the role of geoscientists could be explained to the public. The scope of Volcanoes' Night was exclusively dedicated to geoscience, and in this respect it stands out among all other ERN projects, which are always more general in scope. During its four years of EC funding, the geographical coverage of Volcanoes' Night expanded substantially from a single location in 2012 (Fuencaliente de La Palma, Spain) to a dozen locations in 2015, mobilising multiple scientific organisations, researchers, and public authorities for engagement with the public. The last EC-funded project, Volcanoes' Night III, which was organised in 2014 and 2015, engaged approximately 21,000 visitors through its outreach activities, which included experiments, science cafés, volcano movies, My Day presentations, excursions, science workshops and more. The impact of the project was carefully assessed via surveys and social studies during its lifetime, and an Impact Assessment Report was submitted to the EC after the conclusion of each of the three projects. According to an on-site survey undertaken in 2015, 78.5% of responders reported that their initial understanding of the work of geoscientists improved as a result of the activities organised during the event. The conclusions from the Impact Assessment studies can be used to synthesise methodological recommendations for other organisations that may consider the organisation of similar public outreach actions for geosciences in the future. Scientific experiments are most efficient to raise interest if they are designed for direct engagement with the public so participants can participate in the experiments themselves as opposed to being simple observers. Scientific talks should always include a good level of interaction with the public, for example integrated experiments, quizzes, and real-time surveys. Edutainment options should be finalised in agreement with the audience so that the most interesting ones are selected - this is especially important to create meaningful engagement with young people. The definition of the scope of activities in a way that allows for the inclusion of interdisciplinary subjects (e.g. the intersection of geoscience and robotics) can raise the interest of an even greater public community.

  7. 75 FR 3729 - Environmental Impact Statements and Regulations; Availability of EPA Comments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-22

    ... to address downstream water quality impairment, and funding. Rating LO. EIS No. 20090403, ERP No. D... concerns about this project's potential air quality impacts, and recommended additional information and analysis regarding potential air quality impacts and mitigation be included in the FEIS. Rating EC1. EIS No...

  8. Monitoring of approved studies: A difficult tightrope walk by Ethics Committees.

    PubMed

    Davis, Sanish

    2018-01-01

    Continuing review of studies approved by the Ethics Committees (ECs) involves review of the progress of the study, annual reports, protocol deviations/violations, serious adverse event monitoring, and on-site monitoring. International and national regulations and guidelines for continuing review state that it is an opportunity for the EC to be assured that risks to subjects are minimized and is are reasonable in relation to anticipated benefits if any to the subjects and the knowledge it will generate. There are several barriers (e.g. lack of workforce, lack of training of members for conducting onsite review, and poor infrastructure) for ECs to do ongoing review of projects approved by them. Industry is an important stakeholder for the research enterprise in India and strongly advocates that ECs should at a minimum have pragmatic standard operating procedures for continuing review/monitoring of studies initially approved. ECs which deal with larger volume of studies with well-functioning secretariat, appropriately trained EC members and funding should definitely conduct onsite review/monitoring in addition to the ongoing review.

  9. Exploring Creative Thinking in Graphically Mediated Synchronous Dialogues

    ERIC Educational Resources Information Center

    Wegerif, Rupert; McLaren, Bruce M.; Chamrada, Marian; Scheuer, Oliver; Mansour, Nasser; Miksatko, Jan; Williams, Mriga

    2010-01-01

    This paper reports on an aspect of the EC funded Argunaut project which researched and developed awareness tools for moderators of online dialogues. In this study we report on an investigation into the nature of creative thinking in online dialogues and whether or not this creative thinking can be coded for and recognized automatically such that…

  10. Joint road safety operations in tunnels and open roads

    NASA Astrophysics Data System (ADS)

    Adesiyun, Adewole; Avenoso, Antonio; Dionelis, Kallistratos; Cela, Liljana; Nicodème, Christophe; Goger, Thierry; Polidori, Carlo

    2017-09-01

    The objective of the ECOROADS project is to overcome the barrier established by the formal interpretation of the two Directives 2008/96/EC and 2004/54/EC, which in practice do not allow the same Road Safety Audits/Inspections to be performed inside tunnels. The projects aims at the establishment of a common enhanced approach to road infrastructure and tunnel safety management by using the concepts and criteria of the Directive 2008/96/CE on road infrastructure safety management and the results of related European Commission (EC) funded projects. ECOROADS has already implemented an analysis of national practices regarding Road Safety Inspections (RSI), two Workshops with the stakeholders, and an exchange of best practices between European tunnel experts and road safety professionals, which led to the definition of common agreed safety procedures. In the second phase of the project, different groups of experts and observers applied the above common procedures by inspecting five European road sections featuring both open roads and tunnels in Belgium, Albania, Germany, Serbia and Former Yugoslav Republic of Macedonia. This paper shows the feedback of the 5 joint safety operations and how they are being used for a set of - recommendations and guidelines for the application of the RSA and RSI concepts within the tunnel safety operations.

  11. TBVAC2020: Advancing Tuberculosis Vaccines from Discovery to Clinical Development.

    PubMed

    Kaufmann, Stefan H E; Dockrell, Hazel M; Drager, Nick; Ho, Mei Mei; McShane, Helen; Neyrolles, Olivier; Ottenhoff, Tom H M; Patel, Brij; Roordink, Danielle; Spertini, François; Stenger, Steffen; Thole, Jelle; Verreck, Frank A W; Williams, Ann

    2017-01-01

    TBVAC2020 is a research project supported by the Horizon 2020 program of the European Commission (EC). It aims at the discovery and development of novel tuberculosis (TB) vaccines from preclinical research projects to early clinical assessment. The project builds on previous collaborations from 1998 onwards funded through the EC framework programs FP5, FP6, and FP7. It has succeeded in attracting new partners from outstanding laboratories from all over the world, now totaling 40 institutions. Next to the development of novel vaccines, TB biomarker development is also considered an important asset to facilitate rational vaccine selection and development. In addition, TBVAC2020 offers portfolio management that provides selection criteria for entry, gating, and priority settings of novel vaccines at an early developmental stage. The TBVAC2020 consortium coordinated by TBVI facilitates collaboration and early data sharing between partners with the common aim of working toward the development of an effective TB vaccine. Close links with funders and other consortia with shared interests further contribute to this goal.

  12. TBVAC2020: Advancing Tuberculosis Vaccines from Discovery to Clinical Development

    PubMed Central

    Kaufmann, Stefan H. E.; Dockrell, Hazel M.; Drager, Nick; Ho, Mei Mei; McShane, Helen; Neyrolles, Olivier; Ottenhoff, Tom H. M.; Patel, Brij; Roordink, Danielle; Spertini, François; Stenger, Steffen; Thole, Jelle; Verreck, Frank A. W.; Williams, Ann; Britton, Warwick

    2017-01-01

    TBVAC2020 is a research project supported by the Horizon 2020 program of the European Commission (EC). It aims at the discovery and development of novel tuberculosis (TB) vaccines from preclinical research projects to early clinical assessment. The project builds on previous collaborations from 1998 onwards funded through the EC framework programs FP5, FP6, and FP7. It has succeeded in attracting new partners from outstanding laboratories from all over the world, now totaling 40 institutions. Next to the development of novel vaccines, TB biomarker development is also considered an important asset to facilitate rational vaccine selection and development. In addition, TBVAC2020 offers portfolio management that provides selection criteria for entry, gating, and priority settings of novel vaccines at an early developmental stage. The TBVAC2020 consortium coordinated by TBVI facilitates collaboration and early data sharing between partners with the common aim of working toward the development of an effective TB vaccine. Close links with funders and other consortia with shared interests further contribute to this goal. PMID:29046674

  13. The Virtual Physiological Human - a European initiative for in silico human modelling -.

    PubMed

    Viceconti, Marco; Clapworthy, Gordon; Van Sint Jan, Serge

    2008-12-01

    The Virtual Physiological Human (VPH) is an initiative, strongly supported by the European Commission (EC), that seeks to develop an integrated model of human physiology at multiple scales from the whole body through the organ, tissue, cell and molecular levels to the genomic level. VPH had its beginnings in 2005 with informal discussions amongst like-minded scientists which led to the STEP project, a Coordination Action funded by the EC that began in early 2006. The STEP project greatly accelerated the progress of the VPH and proved to be a catalyst for wide-ranging discussions within Europe and for outreach activities designed to develop a broad international approach to the huge scientific and technological challenges involved in this area. This paper provides an overview of the VPH and the developments it has engendered in the rapidly expanding worldwide activities associated with the physiome. It then uses one particular project, the Living Human Project, to illustrate the type of advances that are taking place to further the aims of the VPH and similar initiatives worldwide.

  14. Testability of VLSI (Very Large Scale Integration) Leakage Faults in CMOS (Complementary Metal Oxide Semiconductor).

    DTIC Science & Technology

    1983-09-01

    has been reviewed and is approved for publication. Im Ŕ APPROVED: . L,.. &- MARK W. LEVI Project Engineer APPROVED: W.S. TUTHILL, Colonel, USAF Chief...ebetract entered In Block 20, if different from Report) Same IS. SUPPLEMENTARY NOTES RADC Project Engineer: Mark W. Levi (RBRP) This effort was funded...masking the presence of another fault which was a functional or reliability hazard. ’." • ’ ",, ,~ MARK W. LEVI A ec . ston For 1\\ T’ ir I .] / r "- T A

  15. Kosmo's Farewell Advice

    NASA Technical Reports Server (NTRS)

    Kosmo, Joe; Ross, Amy

    2012-01-01

    Joe Kosmo shared some final words and advice for his teammates in the Spacesuit and Crew Survival Systems Branch (EC5) and the Crew and Thermal Systems Division (CTSD (EC)) upon his retirement. He knew nothing about spacesuits when he started working for NASA in 1961, but neither did anyone else. He summed up the best lessons learned during his 50 years of developing U.S. spacesuits and encouraged the next generation s space industry workers to challenge what they hear and decide what is right. Topics include and oral history of early NASA manned flights by Richard S. Johnston, U.S. human spaceflight chronology, a history of advanced EVA project funding, and a discussion of NASA's innovative spirit.

  16. Perspectives in marine science: A European point of view

    NASA Astrophysics Data System (ADS)

    Barthel, K.-G.

    1995-03-01

    Marine research has always been a field in science which was particularly open to, and at times dependent on, international cooperation, and this has become even more obvious during the last decade when issues of global change became central to any discussion. The global nature of scientific and other problems, required the development of new concepts and led to the establishment of new structures in research, coordination and funding on an international level. In Europe the 12 member European Community often served as a nucleus for larger networks and initiatives (e.g. COST, EUREKA), and in 1989 the EC itself launched a specific programme on marine research and technology (MAST). The various initiatives are not meant to replace, national efforts but to complement them — where added value arises from international cooperation, e.g. in global programmes like IGBP, WCRP and their various core projects. The focus of support for these programmes through international funding agencies and networks is not primarily on additional research money but more on structural support and coordination. In contrast, the MAST targeted projects on the North Atlantic margin and the Mediterranean also receive substantial basic support, and are designed to fill gaps left by other international research projects. Both EC and other projects profit from the coordinating measures offered by the EC Commission. A more efficient use of facilities (research vessels, special equipment) can be achieved by having central information services. Well-integrated international projects also require additional efforts in standardization of instrumentation, methods and units, with respect to sampling, sample processing and data treatment. Furthermore, the scope of the task to tackle questions of global change demands the development of new technologies like ROVs, biosensors, automatized sample and data acquisition and treatment, etc. Full exploitation of the results in scientific, political and economical terms is only facilitated through special concertation. Mathematical modelling of ecosystems is still in its infancy and needs further cooperative development in order to provide tools for forecasting and management. Finally, training and exchange of personnel on a European, and possibly wider, level needs to be intensified in order to meet the requirements of modern science.

  17. The SAFE project: 'plant food allergies: field to table strategies for reducing their incidence in Europe' an EC-funded study.

    PubMed

    Hoffmann-Sommergruber, K

    2005-04-01

    The true prevalence of food allergy as an IgE mediated reaction is still under discussion. Using apple as a model allergen source a multidisciplinary consortium worked together at developing various strategies for reducing the incidence of fruit allergies in an EC-funded project. Patient allergen profiles were established using in vitro and in vivo tests with respect to geographic area and mild or severe symptoms. Apple allergens (Mal d 1-Mal d 4) were characterised, variants identified, cloned and sequenced. These individual allergens were used to increase the sensitivity and specificity of diagnosis. Furthermore, they provided better prognosis of disease severity. RT-PCR and ELISA were developed for determining the allergen specific mRNA and expressed allergenic protein in a large number of apple cultivars. Similarly, changes in allergen characteristics from harvest through storage to processing and the impact of agronomic practices were investigated. Allergen genes were mapped on a molecular linkage map of apple. The biological function of Mal d 1 was studied using the RNA interference strategy. Finally, consumer attitudes in Northern, Central and Southern Europe were gauged on the acceptability of low allergen cultivars or a GMO and its impact on product quality.

  18. A draft of guidance from the scientific Research Programme GEOTECHNOLOGIEN to underpin the implementation of the CCS Directive in Germany

    NASA Astrophysics Data System (ADS)

    Streibel, Martin; Schoebel, Birgit

    2015-04-01

    In 2004 the Federal Ministry of Education and Research of Germany launched the programme GEOTECHNOLOGIEN with one key aspect being the development of technologies for sustainable storage of carbon dioxide in geological formations. Within this research field more than 30 projects in three consecutive programme phases have been funded up to the end of 2014. In order to benefit from the gathered knowledge and use the experiences for the policy/law making process the umbrella project AUGE has been launched in October 2012 with a life time of three years. The aim of the project is to review and compile all results of projects funded during the three phases to underpin the appendices of the German transposition of the EC Directive 2009/31/EC the "Carbon Dioxide Storage Law" (KSpG). The results of the projects have been structured along the lines of the two appendices of the KSpG which are similar to the ones of the EC Directive. The detailed structure follows the CSA Z741, Canada's first CCS standard for the geological storage of carbon emissions deep underground. This document also serves as the draft version for the ISO Technical Committee 265 "Carbon dioxide capture, transportation, and geological storage". From the risk management perspective, according to ISO 31000, most of the research performed in the above mentioned scientific programme dealt with contextual background of geological CO2 storage asking the question which physical, chemical and biological interactions of CO2 are most important to understand to evaluate if CO2 storage in general is feasible. This lead to risk identification, risk analysis and risk evaluation. Major topics of the scientific programme were • site characterisation with development and optimisation of laboratory procedures and implementation amongst other activities at the pilot site at Ketzin; • optimization of seismic procedures for site characterisation and the detection of injected CO2; • physical, chemical and microbiological interaction of CO2 with the reservoir and the impact of pressure elevation in saline reservoirs; • cap rock and well integrity; • development and test of monitoring methods from the atmosphere down to the reservoir; • development and improvement of numerical methods to simulate injection and spreading of the CO2 plume. During all three phases the knowledge has been incorporated in the risk assessment approach has been further developed. Within this paper we will present a draft of the guidance document which is based on the compilation of results of the early projects and input provided by project partners of the final funding phase of GEOTECHNOLOGIEN.

  19. TRANSVAC research infrastructure - Results and lessons learned from the European network of vaccine research and development.

    PubMed

    Geels, Mark J; Thøgersen, Regitze L; Guzman, Carlos A; Ho, Mei Mei; Verreck, Frank; Collin, Nicolas; Robertson, James S; McConkey, Samuel J; Kaufmann, Stefan H E; Leroy, Odile

    2015-10-05

    TRANSVAC was a collaborative infrastructure project aimed at enhancing European translational vaccine research and training. The objective of this four year project (2009-2013), funded under the European Commission's (EC) seventh framework programme (FP7), was to support European collaboration in the vaccine field, principally through the provision of transnational access (TNA) to critical vaccine research and development (R&D) infrastructures, as well as by improving and harmonising the services provided by these infrastructures through joint research activities (JRA). The project successfully provided all available services to advance 29 projects and, through engaging all vaccine stakeholders, successfully laid down the blueprint for the implementation of a permanent research infrastructure for early vaccine R&D in Europe. Copyright © 2015. Published by Elsevier Ltd.

  20. Evaluating the role of phase I expansion cohorts in oncologic drug development.

    PubMed

    Norris, Robin E; Behtaj, Mohadese; Fu, Pingfu; Dowlati, Afshin

    2017-02-01

    Importance Use of expansion cohorts (EC) in phase I trials is increasing. However, the utility of phase I EC in aiding drug development is unclear. We sought to determine factors associated with the inclusion of EC in phase I studies and the impact of EC on subsequent clinical development. Methods We performed a systematic review of all phase I trials published in the Journal of Clinical Oncology between June 2004 and May 2014. Presence of an EC, number of participants, funding source, class of agent, tumor type, and maximum tolerated dose (MTD)/recommended phase 2 dose (RP2D) were identified. Subsequent conduct of phase II studies and FDA approval of the study agent was also assessed. Results We identified 252 phase I studies. An EC was included in 105 studies. Average accrual on EC studies was 47 compared to 31 in studies without EC (p < 0.0001). There was no impact of time on the inclusion of EC. Only 4 % of phase I studies with an EC provided sample size justification. Source of funding had the only significant association with inclusion of EC. Addition of a phase I EC did not impact the phase I MTD/RP2D, subsequent phase II trial, or FDA approval. Conclusion The importance of including an EC in phase I trials is subject to ongoing debate. Our results demonstrated little benefit to including EC in phase I studies. These findings support that innovative design strategies are needed to optimize the utility of EC in phase I studies.

  1. [QUIPS: quality improvement in postoperative pain management].

    PubMed

    Meissner, Winfried

    2011-01-01

    Despite the availability of high-quality guidelines and advanced pain management techniques acute postoperative pain management is still far from being satisfactory. The QUIPS (Quality Improvement in Postoperative Pain Management) project aims to improve treatment quality by means of standardised data acquisition, analysis of quality and process indicators, and feedback and benchmarking. During a pilot phase funded by the German Ministry of Health (BMG), a total of 12,389 data sets were collected from six participating hospitals. Outcome improved in four of the six hospitals. Process indicators, such as routine pain documentation, were only poorly correlated with outcomes. To date, more than 130 German hospitals use QUIPS as a routine quality management tool. An EC-funded parallel project disseminates the concept internationally. QUIPS demonstrates that patient-reported outcomes in postoperative pain management can be benchmarked in routine clinical practice. Quality improvement initiatives should use outcome instead of structural and process parameters. The concept is transferable to other fields of medicine. Copyright © 2011. Published by Elsevier GmbH.

  2. EU Funded Research Activities on NPPS Operational Safety

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Manolatos, P.; Van Goethem, G.

    2002-07-01

    The 5. framework programme (FP-5), the pluri-annual research programme of the European Union (EU), covers the period 1998-2002. Research on nuclear energy, fusion and fission, is covered by the EURATOM part of the FP-5. An overview of the Euratom's research on Nuclear Reactor Safety, managed by the DG-RTD of the European Commission (EC), is presented. This concerns 70 multi-partner projects of approximately euro 82.5 million total contract value that have been selected and co-financed during the period 1999-2001. They form the three clusters of projects dealing with the 'Operational Safety of Existing Installations'. 'Plant Life Extension and Management' (PLEM), 'Severemore » Accident Management' (SAM) and 'Evolutionary concepts' (EVOL). Emphasis is given here to the projects of the PLEM cluster. (authors)« less

  3. 77 FR 58540 - Notice of Debarment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-21

    ... personal use while you were the owner and president of E-Rate Consulting Services, LLC (ECS).\\4\\ Between May 2006 and January 2009, you deposited those E-Rate funds into your ECS bank account for your...

  4. Peak Power Control with an Energy Management System

    DTIC Science & Technology

    2013-03-01

    Rectifier - Dr. Giovanna Oriti %initial conditions file for model ec3150_software_lab4.mdl ampl=29*sqrt(2); fund=60; ws=2*pi*fund; Ls =200e-6...original % Ls =2e-4; %reduced source inductance Rs=5e-3; Rload=10; Cdc=1100e-6; %-----H-Bridge Model ----- %EC3150 Software lab#5 - H-bridge...using a Simulink model and an experimental laboratory setup. The Simulink model and EMS functionality are validated with the laboratory experiments

  5. IS-ENES project management - lessons learnt

    NASA Astrophysics Data System (ADS)

    Parinet, Marie; Guglielmo, Francesca; Joussaume, Sylvie

    2017-04-01

    IS-ENES is the distributed e-infrastructure of models, model data and metadata of the European Network for Earth System Modelling (ENES). It has benefitted from two EC FP7 grants and aims towards further European and national funding to achieve sustainability. We highlight here several challenges related to project management that have risen in the course of these two project-phases spanning 8 years. Some challenges are related to the heterogeneity of the activities within IS-ENES, with different groups working on very diverse activities, not necessarily strictly interdependent. An immediate consequence is the need of implementing and setting up in early phases of the project efficient collection and circulation of information to preserve and reinforce the systemic view of the infrastructure as a whole and the pursuit of common goals, including coordinated provision of services. Toward and beyond such common goals, managing IS-ENES, covering both scientific and more strictly management-related aspects, implies a double-paced approach: besides setting up efficient project workflow, there is the need of setting up longer term objectives. This implies, within the project lifetime, to elaborate and implement a coherent organizational (consistent with scientific goals, funding schemes, research and technology landscape) strategy to pursue these goals beyond the project itself. Furthermore, a series of more generic project management challenges will also be listed and can be gathered around 3 main objectives: ease the internal processes in order to optimize the work, anticipate delays and budget issues, and motivate the project teams by ensuring an efficient internal and external communication.

  6. 77 FR 31011 - Notice of Suspension and Commencement of Proposed Debarment Proceedings; Schools and Libraries...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-24

    ... with the E-Rate program while you were owner and president of E-Rate Consulting Services, LLC (ECS) in Montgomery, Alabama.\\7\\ ECS assisted schools and school districts in their efforts to qualify for E-Rate funding.\\8\\ ECS arranged to receive through the mail its clients' E-Rate checks, and was supposed to...

  7. Performance of a personal neutron dosemeter based on direct ion storage at workplace fields in the nuclear industry.

    PubMed

    Boschung, M; Fiechtner, A; Wernli, C

    2007-01-01

    In the framework of the EVIDOS project, funded by the EC, measurements were carried out using dosemeters, based on ionisation chambers with direct ion storage (DIS-N), at several workplace fields, namely, at a fuel processing plant, a boiling and a pressurised water reactor, and near transport and storage casks. The measurements and results obtained with the DIS-N in these workplaces, which are representative for the nuclear industry, are described in this study. Different dosemeter configurations of converter and shielding materials were considered. The results are compared with values for personal dose equivalent which were assessed within the EVIDOS project by other partners. The advantages and limitations of the DIS-N dosemeter are discussed.

  8. A zero waste vision for industrial networks in Europe.

    PubMed

    Curran, T; Williams, I D

    2012-03-15

    'ZeroWIN' (Towards Zero Waste in Industrial Networks--www.zerowin.eu) is a five year project running 2009-2014, funded by the EC under the 7th Framework Programme. Project ZeroWIN envisions industrial networks that have eliminated the wasteful consumption of resources. Zero waste is a unifying concept for a range of measures aimed at eliminating waste and challenging old ways of thinking. Aiming for zero waste will mean viewing waste as a potential resource with value to be realised, rather than as a problem to be dealt with. The ZeroWIN project will investigate and demonstrate how existing approaches and tools can be improved and combined to best effect in an industrial network, and how innovative technologies can contribute to achieving the zero waste vision. Copyright © 2011 Elsevier B.V. All rights reserved.

  9. Towards a THz backward wave amplifier in European OPTHER project

    NASA Astrophysics Data System (ADS)

    Dispenza, M.; Brunetti, F.; Cojocaru, C.-S.; de Rossi, A.; Di Carlo, A.; Dolfi, D.; Durand, A.; Fiorello, A. M.; Gohier, A.; Guiset, P.; Kotiranta, M.; Krozer, V.; Legagneux, P.; Marchesin, R.; Megtert, S.; Bouamrane, F.; Mineo, M.; Paoloni, C.; Pham, K.; Schnell, J. P.; Secchi, A.; Tamburri, E.; Terranova, M. L.; Ulisse, G.; Zhurbenko, V.

    2010-10-01

    Within the EC funded international project OPTHER (OPtically Driven TeraHertz AmplifiERs) a considerable technological effort is being undertaken, in terms of technological development, THz device design and integration. The ultimate goal is to develop a miniaturised THz amplifier based on vacuum-tube principles The main target specifications of the OPTHER amplifier are the following: - Operating frequency: in the band 0.3 to 2 THz - Output power: > 10 mW ( 10 dBm ) - Gain: 10 to 20 dB. The project is in the middle of its duration. Design and simulations have shown that these targets can be met with a proper device configuration and careful optimization of the different parts of the amplifier. Two parallel schemes will be employed for amplifier realisation: THz Drive Signal Amplifier and Optically Modulated Beam THz Amplifier.

  10. Childhood Obesity Research Demonstration Project: Cross-Site Evaluation Methods

    PubMed Central

    Lee, Rebecca E.; Mehta, Paras; Thompson, Debbe; Bhargava, Alok; Carlson, Coleen; Kao, Dennis; Layne, Charles S.; Ledoux, Tracey; O'Connor, Teresia; Rifai, Hanadi; Gulley, Lauren; Hallett, Allen M.; Kudia, Ousswa; Joseph, Sitara; Modelska, Maria; Ortega, Dana; Parker, Nathan; Stevens, Andria

    2015-01-01

    Abstract Introduction: The Childhood Obesity Research Demonstration (CORD) project links public health and primary care interventions in three projects described in detail in accompanying articles in this issue of Childhood Obesity. This article describes a comprehensive evaluation plan to determine the extent to which the CORD model is associated with changes in behavior, body weight, BMI, quality of life, and healthcare satisfaction in children 2–12 years of age. Design/Methods: The CORD Evaluation Center (EC-CORD) will analyze the pooled data from three independent demonstration projects that each integrate public health and primary care childhood obesity interventions. An extensive set of common measures at the family, facility, and community levels were defined by consensus among the CORD projects and EC-CORD. Process evaluation will assess reach, dose delivered, and fidelity of intervention components. Impact evaluation will use a mixed linear models approach to account for heterogeneity among project-site populations and interventions. Sustainability evaluation will assess the potential for replicability, continuation of benefits beyond the funding period, institutionalization of the intervention activities, and community capacity to support ongoing program delivery. Finally, cost analyses will assess how much benefit can potentially be gained per dollar invested in programs based on the CORD model. Conclusions: The keys to combining and analyzing data across multiple projects include the CORD model framework and common measures for the behavioral and health outcomes along with important covariates at the individual, setting, and community levels. The overall objective of the comprehensive evaluation will develop evidence-based recommendations for replicating and disseminating community-wide, integrated public health and primary care programs based on the CORD model. PMID:25679060

  11. Science in bullet points: How to compile scientific results to underpin guidelines for CO2 storage for the German transposition of the European CCS Directive

    NASA Astrophysics Data System (ADS)

    Streibel, Martin

    2015-04-01

    In 2012 the German Parliament passed the transposition of the EC Directive 2009/31/EC the "Carbon Dioxide Storage Law" (KSpG). The law focuses on the demonstration of the CO2 storage technology and mainly regulates the storage part of the Carbon Capture and Storage (CCS) chain. As the law has a conceptual character, appendix 1 provides a description of criteria for the characterisation and assessment of a potential CO2 storage site starting with field data ending with requirements for dynamic modelling of the storage complex. Appendix 2 describes the expected monitoring system during all relevant phases of a life cycle of a CO2 storage site. The criteria given in the appendices are of general nature, which reflects on one hand that the CO2 storage technology is still being developed and on the other hand that site specific aspects needs to be considered. In 2004 the Federal Ministry of Education and Research of Germany launched the programme GEOTECHNOLOGIEN with one key aspect being the development of technologies for a sustainable storage of carbon dioxide in geological formations. Within this research field more than 30 projects in three phases have been funded until the end of 2014. In order to benefit from the gathered knowledge and use the experiences for the policy/law making process the umbrella project AUGE has been launched in October 2012 with a life time of three years. The aim of the project is to review and compile all results of projects funded during the three phases to underpin the appendices of the KSpG. In the first part of the paper the most important findings of the project with regard to the overall risk of a geological CO2 storage and the procedure of compiling the guidance document will be discussed. Milestones of this project were • the compilation of the results of national, European and international projects; • interviews with stakeholders; • a workshops to define state of the art for certain involved technologies and existing gaps; • a workshop to understand the limitations of existing simulation tools for large scale CO2 storage. In a second part of the paper it is discussed what kind of guidance documents are actually still required for regulation of large scale CO2 storage sites.

  12. Research project management 101: insiders' tips from Early Career Scientists

    NASA Astrophysics Data System (ADS)

    Cristini, Luisa; Pabortsava, Katsiaryna; Stichel, Torben

    2016-04-01

    From the very beginning of their career, it is important for Early Career Scientists (ECS) to develop project management skills to be able to organise their research efficiently. ECS are often in charge of specific tasks within their projects or for their teams. However, without specific training or tools, the successful completion of these assignments will depend entirely on the organisational skills of individual researchers. ECS are thus facing "sink-or-swim" situations, which can be either instructive or disastrous for their projects. Here we provide experience-based tips from fellow ECS that can help manage various project activities, including: 1. Communication with supervisors and peers 2. Lab management 3. Field trips (e.g., oceanographic campaigns) 4. Internships and collaborations with other institutions 5. Literature/background research 6. Conference convening These are potential "life buoys" for ECS, which will help them to carry out these tasks efficiently and successfully.

  13. Building the European Seismological Research Infrastructure: results from 4 years NERIES EC project

    NASA Astrophysics Data System (ADS)

    van Eck, T.; Giardini, D.

    2010-12-01

    The EC Research Infrastructure (RI) project, Network of Research Infrastructures for European Seismology (NERIES), implemented a comprehensive European integrated RI for earthquake seismological data that is scalable and sustainable. NERIES opened a significant amount of additional seismological data, integrated different distributed data archives, implemented and produced advanced analysis tools and advanced software packages and tools. A single seismic data portal provides a single access point and overview for European seismological data available for the earth science research community. Additional data access tools and sites have been implemented to meet user and robustness requirements, notably those at the EMSC and ORFEUS. The datasets compiled in NERIES and available through the portal include among others: - The expanded Virtual European Broadband Seismic Network (VEBSN) with real-time access to more then 500 stations from > 53 observatories. This data is continuously monitored, quality controlled and archived in the European Integrated Distributed waveform Archive (EIDA). - A unique integration of acceleration datasets from seven networks in seven European or associated countries centrally accessible in a homogeneous format, thus forming the core comprehensive European acceleration database. Standardized parameter analysis and actual software are included in the database. - A Distributed Archive of Historical Earthquake Data (AHEAD) for research purposes, containing among others a comprehensive European Macroseismic Database and Earthquake Catalogue (1000 - 1963, M ≥5.8), including analysis tools. - Data from 3 one year OBS deployments at three sites, Atlantic, Ionian and Ligurian Sea within the general SEED format, thus creating the core integrated data base for ocean, sea and land based seismological observatories. Tools to facilitate analysis and data mining of the RI datasets are: - A comprehensive set of European seismological velocity reference model including a standardized model description with several visualisation tools currently adapted on a global scale. - An integrated approach to seismic hazard modelling and forecasting, a community accepted forecasting testing and model validation approach and the core hazard portal developed along the same technologies as the NERIES data portal. - Implemented homogeneous shakemap estimation tools at several large European observatories and a complementary new loss estimation software tool. - A comprehensive set of new techniques for geotechnical site characterization with relevant software packages documented and maintained (www.geopsy.org). - A set of software packages for data mining, data reduction, data exchange and information management in seismology as research and observatory analysis tools NERIES has a long-term impact and is coordinated with related US initiatives IRIS and EarthScope. The follow-up EC project of NERIES, NERA (2010 - 2014), is funded and will integrate the seismological and the earthquake engineering infrastructures. NERIES further provided the proof of concept for the ESFRI2008 initiative: the European Plate Observing System (EPOS). Its preparatory phase (2010 - 2014) is also funded by the EC.

  14. FAST20XX: Achievements On European Suborbital Space Flight

    NASA Astrophysics Data System (ADS)

    Mack, A.; Steelant, J.; Adirim, H.; Lentsch, A.; Marini, M.; Pilz, N.

    2011-05-01

    In Europe, the EC co-funded project FAST20XX aims at exploring the borderline between aviation and space by investigating suborbital vehicles. The main focus is the identification and mastering of critical technologies for such vehicles rather than the vehicle development itself. Besides the objectives and overall layout of the project, the paper addresses also the progress made during the first period of the project. Two vehicle concepts are considered. A first one is a space vehicle launched from an airplane providing a low-energy ballistic flight experience using hybrid propulsion. The second is a vertically starting two-stage rocket space vehicle system concept taken as a basis to identify the conditions and constraints experienced during high- energy suborbital ultra-fast transport. The paper mainly discusses the two actual reference vehicles and the technical aspects of prerequisites for commercial operation including safety, human spaceflight, business cases, environmental and legal issues.

  15. Abdominal Twin Pressure Sensors for the assessment of abdominal injuries in Q dummies: in-dummy evaluation and performance in accident reconstructions.

    PubMed

    Beillas, Philippe; Alonzo, François; Chevalier, Marie-Christine; Lesire, Philippe; Leopold, Franck; Trosseille, Xavier; Johannsen, Heiko

    2012-10-01

    The Abdominal Pressure Twin Sensors (APTS) for Q3 and Q6 dummies are composed of soft polyurethane bladders filled with fluid and equipped with pressure sensors. Implanted within the abdominal insert of child dummies, they can be used to detect abdominal loading due to the belt during frontal collisions. In the present study - which is part of the EC funded CASPER project - two versions of APTS (V1 and V2) were evaluated in abdominal belt compression tests, torso flexion test (V1 only) and two series of sled tests with degraded restraint conditions. The results suggest that the two versions have similar responses, and that the pressure sensitivity to torso flexion is limited. The APTS ability to detect abdominal loading in sled tests was also confirmed, with peak pressures typically below 1 bar when the belt loaded only the pelvis and the thorax (appropriate restraint) and values above that level when the abdomen was loaded directly (inappropriate restraint). Then, accident reconstructions performed as part of CASPER and previous EC funded projects were reanalyzed. Selected data from 19 dummies (12 Q6 and 7 Q3) were used to plot injury risk curves. Maximum pressure, maximum pressure rate and their product were all found to be injury predictors. Maximum pressure levels for a 50% risk of AIS3+ were consistent with the levels separating appropriate and inappropriate restraint in the sled tests (e.g. 50% risk of AIS3+ at 1.09 bar for pressure filtered CFC180). Further work is needed to refine the scaling techniques between ages and confirm the risk curves.

  16. Executive summary for increment A, B and G energy study at Forest Glen, Walter Reed Army Medical Center, Washington, DC

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1984-04-18

    The purpose of this study is to determine the amount of energy being used, the cost of this energy, and to recommend projects that will reduce energy consumption for Buildings 101, 104, 107, 114, 116, 118, 119, 120, 122, 125 and 138, located in the Forest Glen Complex, which is part of the Walter Reed Army Medical Center (WRAMC). Executive Order No. 12003, 20 July 1977, established energy conservation goals for existing Federal facilities requiring a reduction of 20% in the average energy use in FY 85 from the average annual energy requirements in FY 75. The Energy Conservation Investmentmore » Program (ECIP) is a Military Construction funded program for retrofitting existing DOD facilities to make them more energy efficient and thus providing substantial savings in utility costs. Each project is assessed in terms of source energy saved, the value of the energy and the capital and operating costs of the changes. The ECIP guidance provides two criteria for evaluating energy saving opportunities. These are an energy/cost ratio (E/C) and a benefit/cost ratio (B/C). For FY 84 the E/C ratio must be 13 or more with a B/C greater than one. Beginning with FY 85, ECIP projects will be prioritized on the basis of the greatest life cycle payback as determined by the savings to investment ratio (SIR). Overall projects and discrete portions of projects must be life cycle cost effective (SIR equal to or greater than 1). All energy savings projected in FY 85 shall be based on full occupancy of the buildings in the study.« less

  17. Birds of a Feather - Developments towards shared, regional geological disposal in the EU?

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Codee, H.D.K.; Verhoef, E.V.; McCombie, Ch.

    2008-07-01

    Geological disposal is an essential component of the long-term management of spent fuel, high level and other long-lived radioactive waste. In the EU, all 25 member states generate radioactive waste. Of course, there are large differences in type and quantity between the member states, but all of them need a long-term solution. Even a country with only lightning rods with radium will need a long-term solution for the disposal. The 1600 year half-life of radium does not fit in a solution with a span of control of just a few hundred years. Implementation of a suitable deep repository may, however,more » be difficult or impossible for countries with small volumes of waste, because of the high costs involved. Will economy of scale force these birds of a feather to wait to flock together and share a repository? Implementing a small repository and operating it for very long times is very costly. There are past and current examples of countries being prepared to accept radioactive waste from others if a better environmental solution is thus achieved and if the arrangements are fair for all parties involved. The need for supranational surveillance also points to shared solutions. Although the European Parliament and the Commission have both supported the concept of shared regional repositories in Europe, (national) political and societal constraints have hampered the realization of such facilities up to now. The first step in this staged process was the EC funded project, SAPIERR I. The project (2003 to 2005) studied the feasibility of shared regional storage facilities and geological repositories, for use by European countries. It showed that, if shared regional repositories are to be implemented even some decades ahead, efforts must already be increased now. The next step in the process is to develop a practical implementation strategy and organizational structures to work on shared EU radioactive waste storage and disposal activities. This is addressed in the EC funded project SAPIERR II (2006-2008). The paper gives an update of the SAPIERR II project and describes the progress achieved. (authors)« less

  18. Measurements with the TRITEL system in the Columbus Laboratory of the ISS

    NASA Astrophysics Data System (ADS)

    Hirn, Attila; Reitz, Guenther; Zabori, Balazs; Palfalvi, Jozsef K.; Burmeister, Soenke; Pazmandi, Tamas; Apathy, Istvan; Szanto, Peter; Deme, Sandor; Csoke, Antal

    In cooperation with BL-Electronics Ltd. a three-dimensional silicon detector telescope (TRITEL) was developed at MTA Centre for Energy Research (MTA EK, the former MTA KFKI Atomic Energy Research Institute) in the past years. The main objective of the instrument was to measure not only the absorbed dose in the cosmic radiation field, but also the linear energy (LET) spectrum of the charged particles and their average quality factor in three mutually orthogonal directions in order to give an estimation of the equivalent dose, too. In the frame of the EC project SURE the TRITEL system was delivered to the European Columbus Laboratory of the International Space Station (ISS) in October 31, 2012 and it was operated there between November 6, 2012 and May 10, 2013. Our presentation addresses the main characteristics of the TRITEL-SURE dosimetry system and the first measurement results obtained in the Columbus module. The TRITEL-SURE experiment is co-funded by the EC project SURE, contract number RITA-CT-2006-026069 and by the Government of Hungary through ESA Contracts 98057 and 4000108072/13/NL/KML under the PECS (Plan for European Cooperating States). The view expressed herein can in no way be taken to reflect the official opinion of the European Space Agency.

  19. Understanding State School Funding: The First Step toward Quality Reforms. The Progress of Education Reform. Volume 13, Number 3

    ERIC Educational Resources Information Center

    Griffith, Michael

    2012-01-01

    This quote, taken from a piece written by the Education Commission of the States (ECS) nearly 30 years ago, demonstrates that researchers have long recognized the relationship between quality education reform and the structure of a state's school funding system. However, many policymakers continue to view their state's school funding formula not…

  20. Federal Funding for Special Recreation. Institute Report #4. National Institute on New Models of Community Based Recreation and Leisure Programs and Services for Handicapped Children and Youth.

    ERIC Educational Resources Information Center

    Nesbitt, John A.

    The fourth of nine documents on community based recreation for handicapped persons (EC 114 401-409) examines federal funding for special recreation. The first section reviews functions of assistance in the federal budget, scope of federal programs, and barriers to receiving funds. Three major problem areas (lack of funds for provision of local…

  1. ESMN in Memoriam (1998 -- 2006)

    NASA Astrophysics Data System (ADS)

    Rutten, R. J.

    2007-05-01

    The EC-FP5 European Solar Magnetism Network (ESMN) was terminated during this conference. Together with its FP4 predecessor, the European Solar Magnetometry Network (ESMN), it funded 22 postdoc and 9 graduate-student appointments at nine solar physics groups in Western Europe, it enhanced Europe-wide collaboration in solar physics, and it contributed to the integration of East-European groups in West-European enterprises. Its unfortunate demise results from lack of further fortune in the FP6 lottery. The FP6-funded Utrecht-Stockholm-Oslo graduate school in solar physics represents offspring, the FP6 Solaire network is a partial replacement, and the EAST undertaking and pledge to build an EST is a most worthy FP7 stake. The EC's policy shifts from postdoc to predoc funding and from requiring (too) small to requiring (too) large consortia are criticized.

  2. Efferent projections of the ectostriatum in the pigeon (Columba livia)

    NASA Technical Reports Server (NTRS)

    Husband, S. A.; Shimizu, T.

    1999-01-01

    The ectostriatum is a major visual component of the avian telencephalon. The core region of the ectostriatum (Ec) receives visual input from the optic tectum through thalamic nuclei. In the present study, the efferent projections of the ectostriatum were investigated by using the anterograde tracers Phaseolus vulgaris leucoagglutinin and biotinylated dextran amine. Projection patterns resulting from these tracers were confirmed by the retrograde tracer cholera toxin subunit B. When anterograde tracers were injected in Ec, primary projections were seen traveling dorsolaterally to the belt region of the ectostriatum (Ep) and the neostriatal area immediately surrounding Ep (Ep2). Neurons in Ep sent projections primarily to the overlying Ep2. The efferents of Ep2 traveled dorsolaterally to terminate in three telencephalic regions, from anterior to posterior: (1) neostriatum frontale, pars lateralis (NFL), (2) area temporo-parieto-occipitalis (TPO), and (3) neostriatum intermedium, pars lateralis (NIL). A part of the archistriatum intermedium and the lateral part of the neostriatum caudale also received somewhat minor projections. In addition, some neurons in Ec were also the source of direct, but minor, projections to the NFL, TPO, NIL, and archistriatum intermedium. The topographical relationship among the primary (Ec), secondary (Ep and Ep2), and tertiary (NFL, TPO, NIL) areas indicate that the neural populations for visual processing are organized along the rostral-caudal axis. Thus, the anterior Ec sent efferents to the anterior Ep, which in turn sent projections to anterior Ep2. Neurons in the anterior Ep2 sent projections to NFL and the anterior TPO. Similarly, the intermediate and posterior Ec sent projections to corresponding parts of Ep, whose efferents projected to intermediate and posterior Ep2, respectively. The intermediate Ep2 gave rise to major projections to TPO, whereas posterior Ep2 neurons sent efferents primarily to NIL. The organization of this neural circuit is compared with those of other sensory circuits in the avian telencephalon, as well as the laminar arrangement of the mammalian isocortex.

  3. Data Management Supporting the U.S. Extended Continental Shelf Project

    NASA Astrophysics Data System (ADS)

    Lim, E.; Henderson, J. F.; Warnken, R.; McLean, S. J.; Varner, J. D.; Mcquinn, E.; LaRocque, J.

    2013-12-01

    The U.S. Extended Continental Shelf (ECS) Project is a multi-agency collaboration led by the U.S. Department of State whose mission is to establish the full extent of the continental shelf of the United States consistent with international law. Since 2003, the U.S. has been actively collecting bathymetric, seismic, and other geophysical data and geologic samples required to delineate its outer limits in accordance with Article 76 of the UN Convention on the Law of the Sea. In 2007, the U.S. ECS Task Force designated the National Geophysical Data Center (NGDC) to serve as both the Data Management lead and the Data Archive and Integration Center for the U.S. ECS Project. NGDC, one of three National Oceanic and Atmospheric Administration (NOAA) Offices active in the ECS Project, has the primary responsibility to provide a common infrastructure and a means to integrate the data supporting, and products resulting from ECS analysis. One of the key challenges in the ECS project is the requirement to track the provenance of data and derived products. Final ECS analyses may result in hundreds of points that define a new maritime boundary that is our extended continental shelf. These points will be developed in a rigorous process of analysis encompassing potentially thousands of raw datasets and derived products. NGDC has spent the past two years planning, designing, and partially implementing the Information Management System (IMS), a highly functional, interactive software system that serves as the master database for the ECS Project. The purpose of this geospatial database is to archive, access, and manage the primary data, derivative data and products, associated metadata, information and decisions that will form the U.S. submission. The IMS enables team members to manage ECS data in a consistent way while maintaining institutional memory and the rationale behind decisions. The IMS contains two major components: First, a catalog that acts as the interface to the IMS by organizing the data and products and assisting in populating submission document templates. Second, a web map viewer that geospatially displays the data and products. These components enable dispersed team members to manage ECS data consistently, to track the provenance of data and derived products used in the analyses, and to display analyses using a dynamic web map service. This poster illustrates the importance of data management within the ECS project and focuses on the implementation of the IMS and its use supporting the final determination of a new maritime boundary for the U.S.

  4. From generic pathways to ICT-supported horizontally integrated care: the SmartCare approach and convergence with future Internet assembly.

    PubMed

    Urošević, Vladimir; Mitić, Marko

    2014-01-01

    Successful service integration in policy and practice requires both technology innovation and service process innovation being pursued and implemented at the same time. The SmartCare project (partially EC-funded under CIP ICT PSP Program) aims to achieve this through development, piloting and evaluation of ICT-based services, horizontally integrating health and social care in ten pilot regions, including Kraljevo region in Serbia. The project has identified and adopted two generic highest-level common thematic pathways in joint consolidation phase - integrated support for long-term care and integrated support after hospital discharge. A common set of standard functional specifications for an open ICT platform enabling the delivery of integrated care is being defined, around the challenges of data sharing, coordination and communication in these two formalized pathways. Implementation and system integration on technology and architecture level are to be based on open standards, multivendor interoperability, and leveraging on the current evolving open specification technology foundations developed in relevant projects across the European Research Area.

  5. Virtual reality in Latin American clinical psychology and the VREPAR project. Virtual Reality Environments for Psycho-Neuro-physiological Assessment and Rehabilitation.

    PubMed

    Silva, Mauro Rubens

    2002-10-01

    Starting with the excellent collective work done by the European Community (EC)-funded Virtual Reality Environments for Psycho-Neuro-physiological Assessment and Rehabilitation (VREPAR) projects, I try to indicate some possible pathways that would allow a better integration of this advanced technology into the reality of Latin American psychology. I myself use analyses that I did in my master's degree in the PUCSP-Catholic University in São Paulo, Brazil. I also include a brief description of the CD-ROM Clinical Psychology Uses of Virtual Reality (CPUVR) that accompanies my thesis. I point out the importance of collaboration between psychology and other disciplines, including computer science. I explain the method that I used to work with digital information, important for the formation of a critical mass of people thinking in Portuguese and Spanish to accelerate a technological jump.

  6. What Climate Sensitivity Index Is Most Useful for Projections?

    NASA Astrophysics Data System (ADS)

    Grose, Michael R.; Gregory, Jonathan; Colman, Robert; Andrews, Timothy

    2018-02-01

    Transient climate response (TCR), transient response at 140 years (T140), and equilibrium climate sensitivity (ECS) indices are intended as benchmarks for comparing the magnitude of climate response projected by climate models. It is generally assumed that TCR or T140 would explain more variability between models than ECS for temperature change over the 21st century, since this timescale is the realm of transient climate change. Here we find that TCR explains more variability across Coupled Model Intercomparison Project phase 5 than ECS for global temperature change since preindustrial, for 50 or 100 year global trends up to the present, and for projected change under representative concentration pathways in regions of delayed warming such as the Southern Ocean. However, unexpectedly, we find that ECS correlates higher than TCR for projected change from the present in the global mean and in most regions. This higher correlation does not relate to aerosol forcing, and the physical cause requires further investigation.

  7. What is the part of ``This is not working'' that education authorities didn't get yet?

    NASA Astrophysics Data System (ADS)

    Doran, Rosa

    Science teaching is becoming more and more challenging and learners growing not attracted and uninterested for science topics a teacher’s everyday nightmare. Teachers complain that students are not interested in anything, that they are harder and harder to control, that their attitude towards learning has changes a lot. Where have you heard this before? I know, when you were a student I bet. Well, the problem remains the same but the shifting waves are coming with a higher frequency and their impact more and more disastrous. Now try this, follow the waves of change and try to match them with changes in education systems. You can’t? Well, there you go. Now you understand the title of this talk. Now the question at hand is: Imagine that authorities decide to make education their number 1 priority (would be a dream land wouldn’t it?). Still the problem would persist; teachers are not prepared to face the winds of change so quickly. A strong support network of scientists and educators must be at place to provide the necessary training and follow-up support. This is what the Galileo Teacher Training Program network is encompassing globally and with steady and growing strength. The existence of e-infrastructure and good tools and resources is fundamental. This is where EC funded projects such as Go-lab and Inspire Science Education can make a difference. Testing and piloting cutting edge solutions for introducing a meaningful science experience in schools is the goal of these projects. Educators must also have the freedom to find proper and high quality material, already tested experiences in their native language and adapted to the local curricula. This effort is being implemented in the scope of other EC funded projects: Open Discovery Space and Inspiring Science Education, projects devoted to help educators in Europe to use powerful digital tools and resources in their lessons and help them assess the effectiveness of it. So the cards are on the table, results revealed. Now what we have to do is take our responsibilities at hand and ensure that this generation in the making gets the best instruction. For the sake of our future we must see this wish come true.

  8. Using operational active remote sensing devices to detect Saharan dust advections and evaluate their contribution to the PM10 levels: The EU LIFE+ "DIAPASON" project

    NASA Astrophysics Data System (ADS)

    Gobbi, Gian Paolo; Wille, Holger; Sozzi, Roberto; Barnaba, Francesca; Costabile, Francesca; Angelini, Federico; Frey, Steffen; Bolignano, Andrea; Morelli, Matteo

    2013-04-01

    The contribution of Saharan-dust advections to both daily and annual PM average mass concentrations can be significant all over Southern Europe. The Directive 2008/50/EC allows subtraction of PM10 exceedances caused by natural contributions from the statistic used to determine air-quality levels in Europe. To this purpose, the Commission Staff Working Paper 6771/11 (EC, 2011) provides specific Guidelines on methods to quantify and subtract the contribution of these sources in the framework of the Air Quality Directive. For Saharan dust, the EC methodology is largely based on a thorough analysis performed over the Iberian Peninsula (Escudero et al, 2007), although revision of the current methodology is in progress. In line with the EC Guidelines, the DIAPASON project ("Desert-dust Impact on Air quality through model-Predictions and Advanced Sensors ObservatioNs"), funded under the EC LIFE+ program, has been formulated to provide a robust, user-oriented, and demonstrated method to assess the presence of desert dust and evaluate its contribution to PM10 levels at the monitoring sites. To this end, in addition to satellite-based data and model forecasts already included in the EC Guidelines, DIAPASON will take advantage, in both the Project implementation and demonstration phase, of innovative and affordable technologies (partly prototyped within the project itself), namely operational Polarization Lidar-Ceilometers (PLC) capable of detecting and profiling dust clouds from the ground up to 10 km altitude. The PLC prototypes have been already finalized during the initial phase of the Project. Three of them will be networked in relevant air quality monitoring stations located in the Rome metropolitan area (Italy) during the DIAPASON observational phase (one-year long field campaign) starting in March 2013. The Rome region was chosen as the DIAPASON pilot scale area since highly impacted by urban pollution and frequently affected by Saharan dust transport events. In fact, a preliminary assessment of the role of Saharan dust in this area, based on a four-year dataset (2001-2004) has shown average increases of PM10 levels of the order of 11.9 µg/m3 when Saharan dust presence is either predicted by models or observed by a depolarization lidar. Conversely, PM10 increases computed relying only on the Lidar detections (i.e., presence of dust layers actually observed) were of the order of 15.6 µg/m3. Both analyses indicate the annual average contribution of dust advections to the city PM10 mass concentrations to be of the order of 2.3 µg/m3 (Gobbi et al., 2013). These results confirm Saharan advections in the central Mediterranean as important modulators of PM10 loads and exceedances. After the demonstrative pilot scale study, the DIAPASON results will be spatially generalised to a wider area. The final DIAPASON methodology to detect/quantify the Saharan dust contribution to PM10 will be tailored for a national scale application, and easily transferable to other air-quality and meteorological agencies in Europe. In this work, preliminary results from the combined analysis of Saharan dust model predictions, PM10 data and lidar records performed within DIAPASON will be shown, with particular focus on the added-value provided by continuous polarization lidar data in integrating the present EC Methodology. - EC, Commission Staff Working Paper 6771/11 establishing guidelines for demonstration and subtraction of exceedances attributable to natural sources under the Directive 2008/50/EC on ambient air quality and cleaner air for Europe, European Commission, 2011. - Escudero, M., Querol, X., Pey, J., Alastuey, A., Pérez, N., Ferreira, F., Alonso, S., Rodríguez, S. and Cuevas, E., A methodology for the quantification of the net African dust load in air quality monitoring networks, Atmos. Envir., 41, 5516-5524, 2007. - Gobbi,G. P., F. Angelini, F. Barnaba, F. Costabile, J. M. Baldasano, S. Basart, R. Sozzi and A. Bolignano, Changes in Particulate Matter Physical Properties During Saharan Advections over Rome (Italy): A Four-Year Study, 2001-2004, Atmos. Chem. Phys., Discus., 2013.

  9. Ideology versus evidence: Investigating the claim that the literature on e-cigarettes is undermined by material conflict of interest.

    PubMed

    Kosmider, Leon; Anastasi, Natasha

    2016-04-01

    A review of the health effects of e-cigarettes (EC) by Pisinger and Dossing concluded that any reassuring the evidence on the contents of e-cigarettes cannot be trusted because 'A substantial number of studies were funded or otherwise supported by manufacturers of ECs' and the relevant literature is influenced by 'severe conflicts of interest' (A). The review also asserts that 'Conflict of interest seems to influence the conclusions of these papers' (BC). These claims have been embraced and magnified by EC opponents. The Pisinger and Dossing review included 76 studies and considered 26 (34%) to be 'funded or otherwise supported' by the industry. As the review identifies the 'conflicted' studies, such a claim can be checked. In summary, only 10 (13%) of articles covered by the review were sponsored by the industry and only 5 are published studies. Claim 'A' is misleading. Regarding claim 'B', it appears to have been conceived independent of any empirical support. Recently, anti-EC activists and media started to use conflict of interest accusations to disparage the validity of empirical evidence showing that vaping is much safer than smoking. Evidence needs to be considered on its merits rather than from the perspective of preconceived ideological positions. Copyright © 2016 Elsevier Inc. All rights reserved.

  10. State Funding for Students with Disabilities. ECS 50-State Review

    ERIC Educational Resources Information Center

    Millard, Maria; Aragon, Stephanie

    2015-01-01

    About 13 percent of all public school students receive special educational services and state spending for these students is rising. In Michigan, for example, spending rose 60 percent from 2000 to 2010. While service costs have been increasing, the share of the costs covered by federal funding has been decreasing. Six years ago, the Individuals…

  11. The COMPOSE Project

    NASA Astrophysics Data System (ADS)

    Balletta, P.; Biagini, M.; Gallinaro, G.; Vernucci, A.

    2003-07-01

    This paper provides an overview of the on-going project COMPOSE, an EC co-funded project aiming to define, specify and validate an innovative mobile-services scenario in support of travellers, and to demonstrate the effectiveness of the new proposed location-based value-added services. COMPOSE is supported by organisations belonging to numerous categories covering, as a whole, the entire value-chain of infomobility services provision to the final user. The project team comprises, in addition to the affiliations of the authors, also Teleatlas (NL), ARS T&TT (NL), Alcatel-Bell Space (B), Skysoft (P), Hitech Marketing (A) and MobileGis (IR). The paper describes the services that will be offered to users, encompassing both the pre-trip and the on-trip framework, presents the overall hybrid system architecture also including a via-satellite component based upon the Wideband-CDMA (W-CDMA) technique adopted in UMTS, discusses the access solutions envisaged for that component permitting multiple feeder-link stations to share the CDMA multiplex capacity by directly transmitting their codes to the satellite, and illustrates the results of some computer simulations intended to assess the performance of said access solutions, with regard to the effects of the inevitable up- link frequency errors and transponder non-linearity.

  12. ENLIGHT: European network for Light ion hadron therapy.

    PubMed

    Dosanjh, Manjit; Amaldi, Ugo; Mayer, Ramona; Poetter, Richard

    2018-04-03

    The European Network for Light Ion Hadron Therapy (ENLIGHT) was established in 2002 following various European particle therapy network initiatives during the 1980s and 1990s (e.g. EORTC task group, EULIMA/PIMMS accelerator design). ENLIGHT started its work on major topics related to hadron therapy (HT), such as patient selection, clinical trials, technology, radiobiology, imaging and health economics. It was initiated through CERN and ESTRO and dealt with various disciplines such as (medical) physics and engineering, radiation biology and radiation oncology. ENLIGHT was funded until 2005 through the EC FP5 programme. A regular annual meeting structure was started in 2002 and continues until today bringing together the various disciplines and projects and institutions in the field of HT at different European places for regular exchange of information on best practices and research and development. Starting in 2006 ENLIGHT coordination was continued through CERN in collaboration with ESTRO and other partners involved in HT. Major projects within the EC FP7 programme (2008-2014) were launched for R&D and transnational access (ULICE, ENVISION) and education and training networks (Marie Curie ITNs: PARTNER, ENTERVISION). These projects were instrumental for the strengthening of the field of hadron therapy. With the start of 4 European carbon ion and proton centres and the upcoming numerous European proton therapy centres, the future scope of ENLIGHT will focus on strengthening current and developing European particle therapy research, multidisciplinary education and training and general R&D in technology and biology with annual meetings and a continuously strong CERN support. Collaboration with the European Particle Therapy Network (EPTN) and other similar networks will be pursued. Copyright © 2018 CERN. Published by Elsevier B.V. All rights reserved.

  13. Long-period humidity variability in the Arctic atmosphere from upper-air observations

    NASA Astrophysics Data System (ADS)

    Agurenko, A.; Khokhlova, A.

    2014-12-01

    Under climate change, atmospheric water content also tends to change. This gives rise to changes in the amount of moisture transferred, clouds and precipitation, as well as in hydrological regime. This work analyzes seasonal climatic characteristics of precipitated water in the Arctic atmosphere, by using 1972-2011 data from 55 upper-air stations located north of 60°N. Regions of maximum and minimum mean values and variability trends are determined. In the summer, water amount is shown to increase in nearly the whole of the latitudinal zone. The comparison with the similar characteristics of reanalysis obtained by the other authors shows a good agreement. Time variation in the atmosphere moisture transport crossing 70°N, which is calculated from observation data, is presented and compared with model results. The work is supported by the joint EC ERA.Net RUS and Russian Fundamental Research Fund Project "Arctic Climate Processes Linked Through the Circulation of the Atmosphere" (ACPCA) (project 12-05-91656-ЭРА_а).

  14. Reduced energy consumption by massive thermoelectric waste heat recovery in light duty trucks

    NASA Astrophysics Data System (ADS)

    Magnetto, D.; Vidiella, G.

    2012-06-01

    The main objective of the EC funded HEATRECAR project is to reduce the energy consumption and curb CO2 emissions of vehicles by massively harvesting electrical energy from the exhaust system and re-use this energy to supply electrical components within the vehicle or to feed the power train of hybrid electrical vehicles. HEATRECAR is targeting light duty trucks and focuses on the development and the optimization of a Thermo Electric Generator (TEG) including heat exchanger, thermoelectric modules and DC/DC converter. The main objective of the project is to design, optimize and produce a prototype system to be tested on a 2.3l diesel truck. The base case is a Thermo Electric Generator (TEG) producing 1 KWel at 130 km/h. We present the system design and estimated output power from benchmark Bi2Te3 modules. We discuss key drivers for the optimization of the thermal-to-electric efficiency, such as materials, thermo-mechanical aspects and integration.

  15. Internal Variability and Disequilibrium Confound Estimates of Climate Sensitivity from Observations

    NASA Technical Reports Server (NTRS)

    Marvel, Kate; Pincus, Robert; Schmidt, Gavin A.; Miller, Ron L.

    2018-01-01

    An emerging literature suggests that estimates of equilibrium climate sensitivity (ECS) derived from recent observations and energy balance models are biased low because models project more positive climate feedback in the far future. Here we use simulations from the Coupled Model Intercomparison Project Phase 5 (CMIP5) to show that across models, ECS inferred from the recent historical period (1979-2005) is indeed almost uniformly lower than that inferred from simulations subject to abrupt increases in CO2-radiative forcing. However, ECS inferred from simulations in which sea surface temperatures are prescribed according to observations is lower still. ECS inferred from simulations with prescribed sea surface temperatures is strongly linked to changes to tropical marine low clouds. However, feedbacks from these clouds are a weak constraint on long-term model ECS. One interpretation is that observations of recent climate changes constitute a poor direct proxy for long-term sensitivity.

  16. Internal Variability and Disequilibrium Confound Estimates of Climate Sensitivity From Observations

    NASA Astrophysics Data System (ADS)

    Marvel, Kate; Pincus, Robert; Schmidt, Gavin A.; Miller, Ron L.

    2018-02-01

    An emerging literature suggests that estimates of equilibrium climate sensitivity (ECS) derived from recent observations and energy balance models are biased low because models project more positive climate feedback in the far future. Here we use simulations from the Coupled Model Intercomparison Project Phase 5 (CMIP5) to show that across models, ECS inferred from the recent historical period (1979-2005) is indeed almost uniformly lower than that inferred from simulations subject to abrupt increases in CO2 radiative forcing. However, ECS inferred from simulations in which sea surface temperatures are prescribed according to observations is lower still. ECS inferred from simulations with prescribed sea surface temperatures is strongly linked to changes to tropical marine low clouds. However, feedbacks from these clouds are a weak constraint on long-term model ECS. One interpretation is that observations of recent climate changes constitute a poor direct proxy for long-term sensitivity.

  17. Seos - EARSEL'S Project on Science Education Through Earth Observation for High Schools

    NASA Astrophysics Data System (ADS)

    Reuter, R.

    2011-09-01

    SEOS is an initiative for using remote sensing in science education curricula in high schools funded under the 6th Framework Programme of the European Commission (EC). Eleven partners from several European countries, in cooperation with the European Space Agency (ESA) and teachers from European high schools, created e-learning tutorials for science students in high schools. The tutorials cover many disciplines such as physics, biology, geography, mathematics and engineering, emphasising the interdisciplinary character of remote sensing. They are the core element of the SEOS Learning Management System, allowing teachers to create their own courses, to distribute already available or new worksheets to the students for homework and to collect the results. Forums are available for teachers, students and other users to exchange information and discuss topics relevant for their study.

  18. EC FP6 Siberia-focused Enviro-RISKS Project and its Outcomes

    NASA Astrophysics Data System (ADS)

    Baklanov, A. A.; Gordov, E. P.

    2009-04-01

    The FP6 Project "Man-induced Environmental Risks: Monitoring, Management and Remediation of Man-made Changes in Siberia" (Enviro-RISKS) strategic objective is to facilitate elaboration of solid scientific background and understanding of man-made associated environmental risks, their influence on all aspects of regional environment and optimal ways for it remediation by means of coordinated initiatives of a range of relevant RTD projects as well as to achieve their improved integration thus giving the projects additional synergy in current activities and potential for practical applications. List of Partners includes 3 leading European research organizations, 6 leading Russian research organizations (5 - located in Siberia) and 1 organization from Kazakhstan. Additionally several Russian and European research organizations joined to the Project as Associated Partners. Scientific background and foundation for the project performance is formed by a number of different levels RTD projects carried out by Partners and devoted to near all aspects of the theme. The set comprise coordinated/performed by partners EC funded thematic international projects, Russian national projects and other projects performed by NIS partners. Project outcomes include, in particular, development and support of the bilingual Enviro-RISKS web portal (http://risks.scert.ru/) as the major tool for disseminations of environmental information and project results; achieved level of development of Siberia Integrated Regional Study (SIRS, http://sirs.scert.ru/), which is the Siberia-focused NEESPI Environmental Mega-Project ongoing under the auspices of the Siberian Branch of the Russian Academy of Sciences. The main Project outcome are Memorandum on the state of the art of environmental RTD activity in Siberia and Recommendations on future environmental RTD activity in Siberia elaborated by four Working Experts Groups working in most important for Siberia Thematic Focuses. Three Thematic Focuses/Groups consider major risks inherent to Siberia environment, while the forth Focus has a generic nature. These groups analyzed numerous RTD projects devoted Siberia environment and prepared Reports summarizing their findings. Focus groups Reports are published as a DMI Scientific Report: Atmospheric Pollution and Risks (www.dmi.dk/dmi/sr08-05-1.pdf), Climate/Global Change and Risks (www.dmi.dk/dmi/sr08-05-2.pdf), and Terrestrial Ecosystems and Hydrology and Risks (www.dmi.dk/dmi/sr08-05-3.pdf). Information Systems, Integration and Synthesis (www.dmi.dk/dmi/sr08-05-4.pdf). The results obtained form a solid basis for organization of a coordinated set of the new projects on Siberia environment.

  19. Flood risk management in Italy: challenges and opportunities for the implementation of the EU Floods Directive (2007/60/EC)

    NASA Astrophysics Data System (ADS)

    Mysiak, J.; Testella, F.; Bonaiuto, M.; Carrus, G.; De Dominicis, S.; Ganucci Cancellieri, U.; Firus, K.; Grifoni, P.

    2013-11-01

    Italy's recent history is punctuated with devastating flood disasters claiming high death toll and causing vast but underestimated economic, social and environmental damage. The responses to major flood and landslide disasters such as the Polesine (1951), Vajont (1963), Firenze (1966), Valtelina (1987), Piedmont (1994), Crotone (1996), Sarno (1998), Soverato (2000), and Piedmont (2000) events have contributed to shaping the country's flood risk governance. Insufficient resources and capacity, slow implementation of the (at that time) novel risk prevention and protection framework, embodied in the law 183/89 of 18 May 1989, increased the reliance on the response and recovery operations of the civil protection. As a result, the importance of the Civil Protection Mechanism and the relative body of norms and regulation developed rapidly in the 1990s. In the aftermath of the Sarno (1998) and Soverato (2000) disasters, the Department for Civil Protection (DCP) installed a network of advanced early warning and alerting centres, the cornerstones of Italy's preparedness for natural hazards and a best practice worth following. However, deep convective clouds, not uncommon in Italy, producing intense rainfall and rapidly developing localised floods still lead to considerable damage and loss of life that can only be reduced by stepping up the risk prevention efforts. The implementation of the EU Floods Directive (2007/60/EC) provides an opportunity to revise the model of flood risk governance and confront the shortcomings encountered during more than 20 yr of organised flood risk management. This brief communication offers joint recommendations towards this end from three projects funded by the 2nd CRUE ERA-NET (http://www.crue-eranet.net/) Funding Initiative: FREEMAN, IMRA and URFlood.

  20. Early Childhood Technology Integrated Instructional System (EC-TIIS) Phase 1: A Final Report

    ERIC Educational Resources Information Center

    Hutinger, Patricia; Robinson, Linda; Schneider, Carol

    2004-01-01

    The Early Childhood Technology Integrated Instructional System (EC-TIIS), a Steppingstones of Technology Innovation Phase 1--Development project, was developed by the Center for Best Practices in Early Childhood (the Center) at Western Illinois University as an online instructional system. EC-TIIS' ultimate goal was to improve technology services…

  1. Operational air quality forecasting system for Spain: CALIOPE

    NASA Astrophysics Data System (ADS)

    Baldasano, J. M.; Piot, M.; Jorba, O.; Goncalves, M.; Pay, M.; Pirez, C.; Lopez, E.; Gasso, S.; Martin, F.; García-Vivanco, M.; Palomino, I.; Querol, X.; Pandolfi, M.; Dieguez, J. J.; Padilla, L.

    2009-12-01

    The European Commission (EC) and the United States Environmental Protection Agency (US-EPA) have shown great concerns to understand the transport and dynamics of pollutants in the atmosphere. According to the European directives (1996/62/EC, 2002/3/EC, 2008/50/EC), air quality modeling, if accurately applied, is a useful tool to understand the dynamics of air pollutants, to analyze and forecast the air quality, and to develop programs reducing emissions and alert the population when health-related issues occur. The CALIOPE project, funded by the Spanish Ministry of the Environment, has the main objective to establish an air quality forecasting system for Spain. A partnership of four research institutions composes the CALIOPE project: the Barcelona Supercomputing Center (BSC), the center of investigation CIEMAT, the Earth Sciences Institute ‘Jaume Almera’ (IJA-CSIC) and the CEAM Foundation. CALIOPE will become the official Spanish air quality operational system. This contribution focuses on the recent developments and implementation of the integrated modelling system for the Iberian Peninsula (IP) and Canary Islands (CI) with a high spatial and temporal resolution (4x4 sq. km for IP and 2x2 sq. km for CI, 1 hour), namely WRF-ARW/HERMES04/CMAQ/BSC-DREAM. The HERMES04 emission model has been specifically developed as a high-resolution (1x1 sq. km, 1 hour) emission model for Spain. It includes biogenic and anthropogenic emissions such as on-road and paved-road resuspension production, power plant generation, ship and plane traffic, airports and ports activities, industrial and agricultural sectors as well as domestic and commercial emissions. The qualitative and quantitative evaluation of the model was performed for a reference year (2004) using data from ground-based measurement networks. The products of the CALIOPE system will provide 24h and 48h forecasts for O3, NO2, SO2, CO, PM10 and PM2.5 at surface level. An operational evaluation system has been developed to provide near real-time evaluation products for the Spanish territory. For this purpose, more than 130 surface stations, 2 ozonesondes and the OMI satellite retrieval information are introduced to the system on a daily basis. A web-based visualization system allows a straightforward access to all the evaluation products. The present contribution will describe the main characteristics of the operational system and results of the operational evaluation.

  2. Nuclear targets within the project of solving CHAllenges in Nuclear DAta

    NASA Astrophysics Data System (ADS)

    Sibbens, Goedele; Moens, André; Vanleeuw, David; Lewis, David; Aregbe, Yetunde

    2017-09-01

    In the frame of the European Commission funded integrated project CHANDA (solving CHAllenges in Nuclear DAta) the importance of nuclear target preparation for the accurateness and reliability of experimental nuclear data is set in a dedicated work package (WP3). The global aim of WP3 is the development of a network for nuclear target preparation and characterization, enabling to coordinate the target production corresponding to the experimental requirements. Therefore, a set of tasks within the work package needs to be followed. Primarily, an inventory of target related facilities and radioisotope providers was created. In the next step a priority list of target requests was made in agreement with the target user considering the technical specification, the scheduled experiments and the availability of the target laboratories. A set of target requests has been assigned to the Target Preparation laboratory of the European Commission - Joint Research Centre - Directorate G (EC-JRC.G.2) in Geel, Belgium. This contribution gives an overview of the nuclear targets that are produced within the CHANDA project. The equipment and techniques available for the preparation and characterization of uranium, plutonium and neptunium layers with an areal density ranging from 60 to 205 μg cm-2 will be emphasized.

  3. Caater: Arat - Fokker 27, aircraft facility

    NASA Astrophysics Data System (ADS)

    Penazzi, G.; Joussaume, S.

    2003-04-01

    ARAT (Avion de Recherche Atmosphérique et de Télédétection), is owned and operated by IGN (Institut Géographique National) and managed by INSU, an institute of CNRS (Centre National de la Recherche Scientifique). ARAT is a versatile flying laboratory offering several scientific configurations: basic meteorological instrumentation, turbulent flux equipment, radiation measurement (Visible, Red, IR, UV, J(NO_2), radiance, ground temperature), microphysics sensors, in-situ and remote sensing chemistry instruments (NO-NO_2-NOy and PAN, Water Vapour and Ozone Lidars), Aerosol Lidar, Earth Observation Instrumentation (Visible, Microwave, POLDER), etc. Access to ARAT was offered through the EC-funded IHP-ARI contract, under a co-ordinated aircraft project (with MRF, U.K.; DLR, Germany and Meteo France) called CAATER (Co-ordinated Access to Aircraft for Transnational Environmental Research). Since 2000 access to ARAT has been offered to 6 research groups from different EU Member States for about 10 flight hours each. This project is a follow-on to STAAARTE (1996-2000), which gave access to ARAT to 14 user groups for about 8 flight hours per group. A new project, with new aircraft, within the frame of an Integrated Infrastructure Initiative of the Sixth Framework Programme is currently in preparation.

  4. SALT: How two Norwegian Early Career Scientists made a living out of their passion for marine Science and Education, Outreach, and Communication

    NASA Astrophysics Data System (ADS)

    Rokkan Iversen, K.; Busch, K. T.

    2011-12-01

    Many Early Career Scientists (ECS) share a heart and mind for engaging in Eduaction, Outreach, and Communication (EOC) activities. They often also experience the same frustration due to the limited resources and financial incentives available to support such important projects. The story of the knowledge-based company SALT is a tale of two Norwegian ECSs with a passion for marine science and EOC living their dream - due to the support of private and public funding sources. SALT is located in the small village Svolvær, in the Lofoten Archipelago in Northern-Norway. This small company delivers services and products within research, outreach and consultancy regarding the marine environment. Situated in the very middle of one of the most productive and unique oceanic areas in the world, SALT has a first-row perspective on blue resources, possibilities and challenges. The SALT vision is to provide marine knowledge to politicians and stakeholders, as well as the general public. EOC-projects are an important and prioritized area of this vision, and SALT has taken a broad approach to set such projects into life. SALT are building commercial projects directed towards the tourist and conference industry, as well as more idealistic projects designed to educate and engage children and youth. The total EOC-portifolio of SALT, is therefore as varied as the mixture of different sources funding them. During the first year in business, SALT has proven that it is possible to get funding for innovative EOC-projects in Norway. With the support of Innovation Norway (IN), The Norwegian Research Council (NRC), The RENATE Centre, The Norwegian Centre for Science Education, Nordland County, The Confederation of Norwegian Enterprise (NHO), and an inspiring hub of creative business partners in Lofoten, SALT has managed to realize several EOC-project within a year. SALT is especially grateful that the national structures have acknowledged the importance of innovative EOC- activities also outside the universities and university colleges. Through their support, these national funding sources have given SALT a unique possibility to show the societal potential laying within EOC. The SALT project "The Sailing Marine Biologists", funded by NRC and The RENATE Centre, is a good example of innovative EOC-activities. In this project, SALT will sail with the coastal steamer Hurtigruten along the coast of Norway's very northern county of Finnmark, visiting schools with a magic mixture of our SALT tale, a mobile tidal zone, a neighboring squid, and an engaged dialog on how the local youth can gain their personal potential as well as build their own future society. The central message onboard this SALT cruise, is that it is possible to live your dream - with the help of (science) education. SALT believes that it is important to show youth outside the university cities that their possibilities are as unlimited as everyone else's. The value of bringing this message into their own world is to show how important it is for the Norwegian society, that everyone knows the potential they carry within. SALT is taking "The Sailing Marine Biologists" out to see throughout the winter of 2011/2012, and is excited to show some first glimpse of our experiences with this innovative EOC-project at AGU.

  5. Assessment/Review of Methanol Technology and Utilization as a Fuel.

    DTIC Science & Technology

    1982-07-01

    1981. 32. Owens, E.C., Naegeli , D.W., "Use of Low Molecular Weight Alcohols as Diesel Fuel Extenders (Proposal)," U.S. Army Fuels and Lubricants...34Potential Funding of R&D on Use of Alcohol as Aircraft Fuel," February 4, 1981. 38. Naegeli , D.W., "Dissociated Methanol as an Engine Fuel," Southwest...825-828, 1974. 41. Marbach, H.W., Jr., Owens, E.C., Ryan, T.W., Frame, E.A., Naegeli , D.W., "Evaluation of the effects of Alcohol Fuels on Spark

  6. Laminar activity in the hippocampus and entorhinal cortex related to novelty and episodic encoding

    PubMed Central

    Maass, Anne; Schütze, Hartmut; Speck, Oliver; Yonelinas, Andrew; Tempelmann, Claus; Heinze, Hans-Jochen; Berron, David; Cardenas-Blanco, Arturo; Brodersen, Kay H.; Enno Stephan, Klaas; Düzel, Emrah

    2014-01-01

    The ability to form long-term memories for novel events depends on information processing within the hippocampus (HC) and entorhinal cortex (EC). The HC–EC circuitry shows a quantitative segregation of anatomical directionality into different neuronal layers. Whereas superficial EC layers mainly project to dentate gyrus (DG), CA3 and apical CA1 layers, HC output is primarily sent from pyramidal CA1 layers and subiculum to deep EC layers. Here we utilize this directionality information by measuring encoding activity within HC/EC subregions with 7 T high resolution functional magnetic resonance imaging (fMRI). Multivariate Bayes decoding within HC/EC subregions shows that processing of novel information most strongly engages the input structures (superficial EC and DG/CA2–3), whereas subsequent memory is more dependent on activation of output regions (deep EC and pyramidal CA1). This suggests that while novelty processing is strongly related to HC–EC input pathways, the memory fate of a novel stimulus depends more on HC–EC output. PMID:25424131

  7. [Overview of research projects funding in traditional Chinese medicine oncology field supported by National Natural Science Foundation of China].

    PubMed

    Tang, Dong-Xin; Chen, Lian-Yu; Guo, Shu-Zhen; Han, Li-Wei; Zhang, Feng-Zhu

    2017-05-01

    In this paper, the funding situation of traditional Chinese medicine oncology research projects supported by National Natural Science Fund from 1986-2016 was reviewed. The characteristics of funded projects were summarized from funding amount, funding expenses, funding category, and the main research contents of projects, etc. At the same time, the main problems in the projects were analyzed in this paper, in order to provide reference for the relevant fund applicants. Copyright© by the Chinese Pharmaceutical Association.

  8. Saharan dust contribution to PM levels: The EC LIFE+ DIAPASON project

    NASA Astrophysics Data System (ADS)

    Gobbi, G. P.; Wille, H.; Sozzi, R.; Angelini, F.; Barnaba, F.; Costabile, F.; Frey, S.; Bolignano, A.; Di Giosa, A.

    2012-04-01

    The contribution of Saharan-dust advections to both daily and annual PM average values can be significant all over Southern Europe. The most important effects of dust on the number of PM exceedances are mostly observed in polluted areas and large cities. While a wide literature exists documenting episodes of Saharan dust transport towards the Euro-Mediterranean region and Europe in general, a limited number of studies are still available providing statistically significant results on the impact of Saharan dust on the particulate matter loads over the continent. A four-year (2001-2004) study performed in Rome (Italy) found these events to contribute to the average ground PM10 with about 15±10 µg/m3 on about 17% of the days in a year. Since the PM10 yearly average of many traffic stations in Rome is close to 40 μg/m3, these events can cause the PM10 concentration to exceed air quality limit values (50 μg/m3 as daily average) set by the EU Air Quality Directive 2008/50/EC. Although the European legislation allows Member States to subtract the contribution of natural sources before counting PM10 exceedances, definition of an optimal methodology to quantitatively assess such contribution is still in progress. On the basis of the current European Guidelines on the assessment of natural contributions to PM, the DIAPASON project ("Desert-dust Impact on Air quality through model-Predictions and Advanced Sensors ObservatioNs", recently funded under the EC LIFE+ program) has been formulated to provide a robust, user-oriented methodology to assess the presence of desert dust and its contribution to PM levels. To this end, in addition to satellite-based data and model forecasts, the DIAPASON methodology will employ innovative and affordable technologies, partly prototyped within the project itself, as an operational Polarization Lidar-Ceilometer (laser radar) capable of detecting and profiling dust clouds from the ground up to 10 km altitude. The DIAPASON Project (2011-2014) will be first implemented as a network of three stations in the Rome metropolitan area. However, the DIAPASON methodology to detect/quantify the Saharan dust contribution to PM will be designed to be easily applicable by air-quality and meteorological agencies. In fact, the possibility of manufacturing cheap, operational polarization lidar-ceilometers and scatter them on the territory will also represent a breakthrough in the detection and quantification of other atmospheric aerosol layers, as volcanic or wild-fire plumes, with further benefits in terms of meteo forecasts, flight security and air quality assessments.

  9. A method for evaluating the funding of components of natural resource and conservation projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wellington, John F., E-mail: welling@ipfw.edu; Lewis, Stephen A., E-mail: lewis.sa07@gmail.com

    Many public and private entities such as government agencies and private foundations have missions related to the improvement, protection, and sustainability of the environment. In pursuit of their missions, they fund projects with related outcomes. Typically, the funding scene consists of scarce funding dollars for the many project requests. In light of funding limitations and funder's search for innovative funding schemes, a method to support the allocation of scarce dollars among project components is presented. The proposed scheme has similarities to methods in the project selection literature but differs in its focus on project components and its connection to andmore » enumeration of the universe of funding possibilities. The value of having access to the universe is demonstrated with illustrations. The presentation includes Excel implementations that should appeal to a broad spectrum of project evaluators and reviewers. Access to the space of funding possibilities facilitates a rich analysis of funding alternatives. - Highlights: • Method is given for allocating scarce funding dollars among competing projects. • Allocations are made to fund parts of projects • Proposed method provides access to the universe of funding possibilities. • Proposed method facilitates a rich analysis of funding possibilities. • Excel spreadsheet implementations are provided.« less

  10. 31 CFR 205.16 - What special rules apply to Federal assistance programs and projects funded by the Federal...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... assistance programs and projects funded by the Federal Highway Trust Fund? 205.16 Section 205.16 Money and... special rules apply to Federal assistance programs and projects funded by the Federal Highway Trust Fund? The following applies to Federal assistance programs and projects funded out of the Federal Highway...

  11. 31 CFR 205.16 - What special rules apply to Federal assistance programs and projects funded by the Federal...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... assistance programs and projects funded by the Federal Highway Trust Fund? 205.16 Section 205.16 Money and... special rules apply to Federal assistance programs and projects funded by the Federal Highway Trust Fund? The following applies to Federal assistance programs and projects funded out of the Federal Highway...

  12. 31 CFR 205.16 - What special rules apply to Federal assistance programs and projects funded by the Federal...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... assistance programs and projects funded by the Federal Highway Trust Fund? 205.16 Section 205.16 Money and... special rules apply to Federal assistance programs and projects funded by the Federal Highway Trust Fund? The following applies to Federal assistance programs and projects funded out of the Federal Highway...

  13. 31 CFR 205.16 - What special rules apply to Federal assistance programs and projects funded by the Federal...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... assistance programs and projects funded by the Federal Highway Trust Fund? 205.16 Section 205.16 Money and... special rules apply to Federal assistance programs and projects funded by the Federal Highway Trust Fund? The following applies to Federal assistance programs and projects funded out of the Federal Highway...

  14. 31 CFR 205.16 - What special rules apply to Federal assistance programs and projects funded by the Federal...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... assistance programs and projects funded by the Federal Highway Trust Fund? 205.16 Section 205.16 Money and... special rules apply to Federal assistance programs and projects funded by the Federal Highway Trust Fund? The following applies to Federal assistance programs and projects funded out of the Federal Highway...

  15. Introduction to the EC's Marie Curie Initial Training Network (MC-ITN) project: Particle Training Network for European Radiotherapy (PARTNER).

    PubMed

    Dosanjh, Manjit; Magrin, Giulio

    2013-07-01

    PARTNER (Particle Training Network for European Radiotherapy) is a project funded by the European Commission's Marie Curie-ITN funding scheme through the ENLIGHT Platform for 5.6 million Euro. PARTNER has brought together academic institutes, research centres and leading European companies, focusing in particular on a specialized radiotherapy (RT) called hadron therapy (HT), interchangeably referred to as particle therapy (PT). The ultimate goal of HT is to deliver more effective treatment to cancer patients leading to major improvement in the health of citizens. In Europe, several hundred million Euro have been invested, since the beginning of this century, in PT. In this decade, the use of HT is rapidly growing across Europe, and there is an urgent need for qualified researchers from a range of disciplines to work on its translational research. In response to this need, the European community of HT, and in particular 10 leading academic institutes, research centres, companies and small and medium-sized enterprises, joined together to form the PARTNER consortium. All partners have international reputations in the diverse but complementary fields associated with PT: clinical, radiobiological and technological. Thus the network incorporates a unique set of competencies, expertise, infrastructures and training possibilities. This paper describes the status and needs of PT research in Europe, the importance of and challenges associated with the creation of a training network, the objectives, the initial results, and the expected long-term benefits of the PARTNER initiative.

  16. Fate of protocols submitted to a French national funding scheme: a cohort study.

    PubMed

    Decullier, Evelyne; Huot, Laure; Chapuis, François R

    2014-01-01

    The fate of clinical research projects funded by a grant has been investigated, but there is no information on the projects which did not receive funding. The fate of these projects is not known: do they apply for and/or receive funding from other sources or are they carried out without specific funding? The aim of the study was to describe all clinical research projects submitted to a French national funding scheme (PHRC 2000) and to assess project initiation, completion and publication status taking into account whether or not they received funding. This study is a retrospective cohort. The initial project characteristics were retrieved from the submission files and follow-up information was collected from the primary investigator. The percentages of projects started, completed and published were studied. A total of 481 projects were studied. Follow-up information was obtained for 366. Overall, 185 projects were initiated (51%); 139 of them were funded by the PHRC 2000 or other sources. The most commonly cited reason for not initiating a project was a lack of funding. Subsequently, 121 of the projects initiated were completed (65%). Accrual difficulties were the main reason cited to explain why studies were stopped prematurely or were still ongoing. Finally, 88 of the completed projects were published (73%). Amongst the completed projects, the only factor explaining publication was the statistical significance of the results. Obtainment of funding was a determining factor for project initiation. However, once initiated, the funding did not influence completion or publication.

  17. Rainfall assimilation in RAMS by means of the Kuo parameterisation inversion: method and preliminary results

    NASA Astrophysics Data System (ADS)

    Orlandi, A.; Ortolani, A.; Meneguzzo, F.; Levizzani, V.; Torricella, F.; Turk, F. J.

    2004-03-01

    In order to improve high-resolution forecasts, a specific method for assimilating rainfall rates into the Regional Atmospheric Modelling System model has been developed. It is based on the inversion of the Kuo convective parameterisation scheme. A nudging technique is applied to 'gently' increase with time the weight of the estimated precipitation in the assimilation process. A rough but manageable technique is explained to estimate the partition of convective precipitation from stratiform one, without requiring any ancillary measurement. The method is general purpose, but it is tuned for geostationary satellite rainfall estimation assimilation. Preliminary results are presented and discussed, both through totally simulated experiments and through experiments assimilating real satellite-based precipitation observations. For every case study, Rainfall data are computed with a rapid update satellite precipitation estimation algorithm based on IR and MW satellite observations. This research was carried out in the framework of the EURAINSAT project (an EC research project co-funded by the Energy, Environment and Sustainable Development Programme within the topic 'Development of generic Earth observation technologies', Contract number EVG1-2000-00030).

  18. 23 CFR 646.208 - Funding.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...-Highway Projects § 646.208 Funding. (a) Railroad/highway crossing projects may be funded through the Federal-aid funding source appropriate for the involved project. (b) Projects for the elimination of... 23 Highways 1 2010-04-01 2010-04-01 false Funding. 646.208 Section 646.208 Highways FEDERAL...

  19. 23 CFR 646.208 - Funding.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Funding. 646.208 Section 646.208 Highways FEDERAL...-Highway Projects § 646.208 Funding. (a) Railroad/highway crossing projects may be funded through the Federal-aid funding source appropriate for the involved project. (b) Projects for the elimination of...

  20. 23 CFR 646.208 - Funding.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Funding. 646.208 Section 646.208 Highways FEDERAL...-Highway Projects § 646.208 Funding. (a) Railroad/highway crossing projects may be funded through the Federal-aid funding source appropriate for the involved project. (b) Projects for the elimination of...

  1. 23 CFR 646.208 - Funding.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Funding. 646.208 Section 646.208 Highways FEDERAL...-Highway Projects § 646.208 Funding. (a) Railroad/highway crossing projects may be funded through the Federal-aid funding source appropriate for the involved project. (b) Projects for the elimination of...

  2. 23 CFR 646.208 - Funding.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Funding. 646.208 Section 646.208 Highways FEDERAL...-Highway Projects § 646.208 Funding. (a) Railroad/highway crossing projects may be funded through the Federal-aid funding source appropriate for the involved project. (b) Projects for the elimination of...

  3. MSFC Sortie Laboratory Environmental Control System (ECS) phase B design study results

    NASA Technical Reports Server (NTRS)

    Ignatonis, A. J.; Mitchell, K. L.

    1974-01-01

    Phase B effort of the Sortie Lab program has concluded. Results of that effort are presented which pertain to the definitions of the environmental control system (ECS). Numerous design studies were performed in Phase B to investigate system feasibility, complexity, weight, and cost. The results and methods employed for these design studies are included. An autonomous Sortie Lab ECS was developed which utilizes a deployed space radiator. Total system weight was projected to be 1814.4 kg including the radiator and fluids. ECS power requirements were estimated at 950 watts.

  4. The Drawbacks of Project Funding for Epistemic Innovation: Comparing Institutional Affordances and Constraints of Different Types of Research Funding.

    PubMed

    Franssen, Thomas; Scholten, Wout; Hessels, Laurens K; de Rijcke, Sarah

    2018-01-01

    Over the past decades, science funding shows a shift from recurrent block funding towards project funding mechanisms. However, our knowledge of how project funding arrangements influence the organizational and epistemic properties of research is limited. To study this relation, a bridge between science policy studies and science studies is necessary. Recent studies have analyzed the relation between the affordances and constraints of project grants and the epistemic properties of research. However, the potentially very different affordances and constraints of funding arrangements such as awards, prizes and fellowships, have not yet been taken into account. Drawing on eight case studies of funding arrangements in high performing Dutch research groups, this study compares the institutional affordances and constraints of prizes with those of project grants and their effects on organizational and epistemic properties of research. We argue that the prize case studies diverge from project-funded research in three ways: 1) a more flexible use, and adaptation of use, of funds during the research process compared to project grants; 2) investments in the larger organization which have effects beyond the research project itself; and 3), closely related, greater deviation from epistemic and organizational standards. The increasing dominance of project funding arrangements in Western science systems is therefore argued to be problematic in light of epistemic and organizational innovation. Funding arrangements that offer funding without scholars having to submit a project-proposal remain crucial to support researchers and research groups to deviate from epistemic and organizational standards.

  5. Using internet GIS technology for early warning, response and controlling the quality of the public health sector.

    PubMed

    Ptochos, Dimitrios; Panopoulos, Dimitrios; Metaxiotis, Kostas; Askounis, Dimitrios

    2004-01-01

    Recent EU and Greek Government legislation highlights the need for the modernisation of the public health management system and the improvement of the overall health of EU citizens. In addition, the effusion of epidemics even in developed countries makes the need for the enhancement of public health services imperative. In order to best confront the above-described challenges, the National Technical University of Athens, in cooperation with the Greek Ministry of Health and Welfare and the European Commission (EC), designed and developed an integrated public health information network, named GEPIMI (Integrated Geographical System for EPIdemiological and other Medical Information), in the framework of a three-year pilot project. This pilot project, funded by Greek Ministry of Health and Welfare and the EC supported the Programme INTERREG II to establish an advanced and integrated web-based information system that can process and move information in real time, allowing public health authorities to monitor events at hundreds or thousands of public health facilities at once. The system is established among hospitals, primary healthcare authorities and health agents in Greece, Bulgaria, Albania, Fyrom, and Turkey. The project aims at demonstrating the best practices, prospects, applications and high potential of Telematics Healthcare Networks in Europe, with a view to promoting cooperation and interconnection between European communities in the field of Telematics Healthcare Applications. The GEPIMI System, implemented via an innovative web based system, constitutes a replication of a highly effective mechanism. It incorporates state-of-the-art technologies such as Geographic Information Systems (G.I.S.), web based databases, GPS, and Smart Card Technology and supports a variety of health-related web applications including early warning and response of epidemics, remote management of medical records, seamless healthcare coverage, comprehensive statistical analysis of data, decision-making procedures, inter-communication between international scientific fora and other.

  6. ROCKY MOUNTAIN REGIONAL HAZARDOUS SUBSTANCE RESEARCH CENTER FOR REMEDIATION OF MINE WASTE SITES

    EPA Science Inventory

    A total of 11 research projects were funded as part of the Rocky Mountain Regional HSRC. The typical project duration was 2 years, with one project funded for 3 years and another project funded for only 1 year. Three projects were funded in each of three research focus areas, ...

  7. Spin-orbit coupling in ultracold Fermi gases of 173Yb atoms

    NASA Astrophysics Data System (ADS)

    Song, Bo; He, Chengdong; Hajiyev, Elnur; Ren, Zejian; Seo, Bojeong; Cai, Geyue; Amanov, Dovran; Zhang, Shanchao; Jo, Gyu-Boong

    2017-04-01

    Synthetic spin-orbit coupling (SOC) in cold atoms opens an intriguing new way to probe nontrivial topological orders beyond natural conditions. Here, we report the realization of the SOC physics both in a bulk system and in an optical lattice. First, we demonstrate two hallmarks induced from SOC in a bulk system, spin dephasing in the Rabi oscillation and asymmetric atomic distribution in the momentum space respectively. Then we describe the observation of non-trivial spin textures and the determination of the topological phase transition in a spin-dependent optical lattice dressed by the periodic Raman field. Furthermore, we discuss the quench dynamics between topological and trivial states by suddenly changing the band topology. Our work paves a new way to study non-equilibrium topological states in a controlled manner. Funded by Croucher Foundation and Research Grants Council (RGC) of Hong Kong (Project ECS26300014, GRF16300215, GRF16311516, and Croucher Innovation Grants).

  8. Nanopatterned reconfigurable spin-textures for magnonics

    NASA Astrophysics Data System (ADS)

    Albisetti, E.; Petti, D.; Pancaldi, M.; Madami, M.; Tacchi, S.; Curtis, J.; King, W. P.; Papp, A.; Csaba, G.; Porod, W.; Vavassori, P.; Riedo, E.; Bertacco, R.

    The control of spin-waves holds the promise to enable energy-efficient information transport and wave-based computing. Conventionally, the engineering of spin-waves is achieved via physically patterning magnetic structures such as magnonic crystals and micro-nanowires. We demonstrate a new concept for creating reconfigurable magnonic nanostructures, by crafting at the nanoscale the magnetic anisotropy landscape of a ferromagnet exchange-coupled to an antiferromagnet. By performing a highly localized field cooling with the hot tip of a scanning probe microscope, magnetic structures, with arbitrarily oriented magnetization and tunable unidirectional anisotropy, are patterned without modifying the film chemistry and topography. We demonstrate that, in such structures, the spin-wave excitation and propagation can be spatially controlled at remanence, and can be tuned by external magnetic fields. This opens the way to the use of nanopatterned spin-textures, such as domains and domain walls, for exciting and manipulating magnons in reconfigurable nanocircuits. Partially funded by the EC through project SWING (no. 705326).

  9. Impacts of climate changes on ocean surface gravity waves over the eastern Canadian shelf

    NASA Astrophysics Data System (ADS)

    Guo, Lanli; Sheng, Jinyu

    2017-05-01

    A numerical study is conducted to investigate the impact of climate changes on ocean surface gravity waves over the eastern Canadian shelf (ECS). The "business-as-usual" climate scenario known as Representative Concentration Pathway RCP8.5 is considered in this study. Changes in the ocean surface gravity waves over the study region for the period 1979-2100 are examined based on 3 hourly ocean waves simulated by the third-generation ocean wave model known as WAVEWATCHIII. The wave model is driven by surface winds and ice conditions produced by the Canadian Regional Climate Model (CanRCM4). The whole study period is divided into the present (1979-2008), near future (2021-2050) and far future (2071-2100) periods to quantify possible future changes of ocean waves over the ECS. In comparison with the present ocean wave conditions, the time-mean significant wave heights ( H s ) are expected to increase over most of the ECS in the near future and decrease over this region in the far future period. The time-means of the annual 5% largest H s are projected to increase over the ECS in both near and far future periods due mainly to the changes in surface winds. The future changes in the time-means of the annual 5% largest H s and 10-m wind speeds are projected to be twice as strong as the changes in annual means. An analysis of inverse wave ages suggests that the occurrence of wind seas is projected to increase over the southern Labrador and central Newfoundland Shelves in the near future period, and occurrence of swells is projected to increase over other areas of the ECS in both the near and far future periods.

  10. 42 CFR 137.340 - May a Self-Governance Tribe contribute funding to a project?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 1 2012-10-01 2012-10-01 false May a Self-Governance Tribe contribute funding to a... Project Assumption Process § 137.340 May a Self-Governance Tribe contribute funding to a project? Yes, the Self-Governance Tribe and the Secretary may jointly fund projects. The construction project agreement...

  11. 42 CFR 137.340 - May a Self-Governance Tribe contribute funding to a project?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false May a Self-Governance Tribe contribute funding to a... Project Assumption Process § 137.340 May a Self-Governance Tribe contribute funding to a project? Yes, the Self-Governance Tribe and the Secretary may jointly fund projects. The construction project agreement...

  12. 42 CFR 137.340 - May a Self-Governance Tribe contribute funding to a project?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false May a Self-Governance Tribe contribute funding to a... Project Assumption Process § 137.340 May a Self-Governance Tribe contribute funding to a project? Yes, the Self-Governance Tribe and the Secretary may jointly fund projects. The construction project agreement...

  13. 42 CFR 137.340 - May a Self-Governance Tribe contribute funding to a project?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false May a Self-Governance Tribe contribute funding to a... Project Assumption Process § 137.340 May a Self-Governance Tribe contribute funding to a project? Yes, the Self-Governance Tribe and the Secretary may jointly fund projects. The construction project agreement...

  14. Key site abandonment steps in CO2 storage

    NASA Astrophysics Data System (ADS)

    Kühn, M.; Wipki, M.; Durucan, S.; Deflandre, J.-P.; Lüth, S.; Wollenweber, J.; Chadwick, A.; Böhm, G.

    2012-04-01

    CO2CARE is an EU funded project within FP7-research, which started in January 2011 with a funding period of three years. The project objectives will be achieved through an international consortium consisting of 23 partners from Europe, USA, Canada, Japan, and Australia, belonging to universities, research institutes, and energy companies. According to the EC Guidance Document 3, the lifetime of a CO2 storage site can be generally subdivided into 6 phases: 1. assessment, 2. characterisation, 3. development, 4. operation, 5. post-closure/pre-transfer, and 6. post transfer. CO2CARE deals with phases 5 and 6. The main goals of the project are closely linked to the three high-level requirements of the EU Directive 2009/31/EC, Article 18 for CO2 storage which are: (i) absence of any detectable leakage, (ii) conformity of actual behaviour of the injected CO2 with the modelled behaviour, and (iii) the storage site is evolving towards a situation of long-term stability. These criteria have to be fulfilled prior to subsequent transfer of responsibility to the competent authorities, typically 20 or 30 years after site closure. CO2CARE aims to formulate robust procedures for site abandonment which will meet the regulatory requirements and ensure long-term integrity of the storage complex. We present key results from the first year of the project via a report on international regulatory requirements on CO2 geological storage and site abandonment that includes a general overview on the current state-of-the art in abandonment methodologies in the oil and gas industry worldwide. Due to the long time-frames involved in CO2 storage (in the range of several thousands of years), the behaviour of a system with respect to, for example, long-term well stability can be demonstrated only by using long-term predictive modelling tools to study potential leakage pathways. Trapping mechanisms for CO2 are of high interest concerning a quantitative estimation of physically captured, capillary bound, dissolved, and precipitated CO2 in form of specific mineral phases. Useful results, partly supported by laboratory and field experiments, can be gained by process simulations considering periods of hundreds or thousands of years. Risk management for the post-operational phases is another essential part of the workflow. A first version of a decision support system has been created by means of a number of high-level and low-level criteria, most of which had to be defined in advance. The system provides instructions for the operators on how to act in case of irregularities after site closure. A compilation of all relevant results will be available at the end of the project in form of best practice guidelines. However, dissemination of information about the latest results and developments in the field of site abandonment are given via the CO2CARE-website (www.co2care.org) and also in conferences, workshops or radio and TV interviews.

  15. Entorhinal Cortical Ocean Cells Encode Specific Contexts and Drive Context-Specific Fear Memory

    PubMed Central

    Kitamura, Takashi; Sun, Chen; Martin, Jared; Kitch, Lacey J; Schnitzer, Mark J; Tonegawa, Susumu

    2016-01-01

    Summary Forming distinct representations and memories of multiple contexts and episodes is thought to be a crucial function of the hippocampal-entorhinal cortical network. The hippocampal dentate gyrus (DG) and CA3 are known to contribute to these functions but the role of the entorhinal cortex (EC) is poorly understood. Here, we show that Ocean cells, excitatory stellate neurons in the medial EC layer II projecting into DG and CA3, rapidly form a distinct representation of a novel context and drive context-specific activation of downstream CA3 cells as well as context-specific fear memory. In contrast, Island cells, excitatory pyramidal neurons in the medial EC layer II projecting into CA1, are indifferent to context-specific encoding or memory. On the other hand, Ocean cells are dispensable for temporal association learning, for which Island cells are crucial. Together, the two excitatory medial EC layer II inputs to the hippocampus have complementary roles in episodic memory. PMID:26402611

  16. Activation of Entorhinal Cortical Projections to the Dentate Gyrus Underlies Social Memory Retrieval.

    PubMed

    Leung, Celeste; Cao, Feng; Nguyen, Robin; Joshi, Krutika; Aqrabawi, Afif J; Xia, Shuting; Cortez, Miguel A; Snead, O Carter; Kim, Jun Chul; Jia, Zhengping

    2018-05-22

    Social interactions are essential to our mental health, and a deficit in social interactions is a hallmark characteristic of numerous brain disorders. Various subregions within the medial temporal lobe have been implicated in social memory, but the underlying mechanisms that tune these neural circuits remain unclear. Here, we demonstrate that optical activation of excitatory entorhinal cortical perforant projections to the dentate gyrus (EC-DG) is necessary and sufficient for social memory retrieval. We further show that inducible disruption of p21-activated kinase (PAK) signaling, a key pathway important for cytoskeletal reorganization, in the EC-DG circuit leads to impairments in synaptic function and social recognition memory, and, importantly, optogenetic activation of the EC-DG terminals reverses the social memory deficits in the transgenic mice. These results provide compelling evidence that activation of the EC-DG pathway underlies social recognition memory recall and that PAK signaling may play a critical role in modulating this process. Copyright © 2018 The Author(s). Published by Elsevier Inc. All rights reserved.

  17. Policy Trends Impacting Community Colleges: An ECS Perspective

    ERIC Educational Resources Information Center

    Sponsler, Brian A.; Pingel, Sarah; Anderson, Lexi

    2015-01-01

    Given the importance of community and technical colleges to state education attainment and workforce development goals, policy addressing the two-year sector is of critical importance to state policymakers. Analysis of legislative issue trends suggests transfer and articulation, performance-based funding, and financial aid programs are substantial…

  18. 77 FR 71408 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-30

    ... that the Commission received the following electric corporate filings: Docket Numbers: EC13-46-000... Expedited Consideration and Confidential Treatment of Spearville 3, LLC, et al. Filed Date: 11/21/12... Jurisdictional Facilities and Request for Confidential Treatment of Algonquin Power Fund (America) Inc., et al...

  19. A platform for European CMOS image sensors for space applications

    NASA Astrophysics Data System (ADS)

    Minoglou, K.; San Segundo Bello, D.; Sabuncuoglu Tezcan, D.; Haspeslagh, L.; Van Olmen, J.; Merry, B.; Cavaco, C.; Mazzamuto, F.; Toqué-Trésonne, I.; Moirin, R.; Brouwer, M.; Toccafondi, M.; Preti, G.; Rosmeulen, M.; De Moor, P.

    2017-11-01

    Both ESA and the EC have identified the need for a supply chain of CMOS imagers for space applications which uses solely European sources. An essential requirement on this supply chain is the platformization of the process modules, in particular when it comes to very specific processing steps, such as those required for the manufacturing of backside illuminated image sensors. This is the goal of the European (EC/FP7/SPACE) funded project EUROCIS. All EUROCIS partners have excellent know-how and track record in the expertise fields required. Imec has been leading the imager chip design and the front side and backside processing. LASSE, as a major player in the laser annealing supplier sector, has been focusing on the optimization of the process related to the backside passivation of the image sensors. TNO, known worldwide as a top developer of instruments for scientific research, including space research and sensors for satellites, has contributed in the domain of optical layers for space instruments and optimized antireflective coatings. Finally, Selex ES, as a world-wide leader for manufacturing instruments with expertise in various space missions and programs, has defined the image sensor specifications and is taking care of the final device characterization. In this paper, an overview of the process flow, the results on test structures and imagers processed using this platform will be presented.

  20. The EuroBioBank Network: 10 years of hands-on experience of collaborative, transnational biobanking for rare diseases

    PubMed Central

    Mora, Marina; Angelini, Corrado; Bignami, Fabrizia; Bodin, Anne-Mary; Crimi, Marco; Di Donato, Jeanne- Hélène; Felice, Alex; Jaeger, Cécile; Karcagi, Veronika; LeCam, Yann; Lynn, Stephen; Meznaric, Marija; Moggio, Maurizio; Monaco, Lucia; Politano, Luisa; de la Paz, Manuel Posada; Saker, Safaa; Schneiderat, Peter; Ensini, Monica; Garavaglia, Barbara; Gurwitz, David; Johnson, Diana; Muntoni, Francesco; Puymirat, Jack; Reza, Mojgan; Voit, Thomas; Baldo, Chiara; Bricarelli, Franca Dagna; Goldwurm, Stefano; Merla, Giuseppe; Pegoraro, Elena; Renieri, Alessandra; Zatloukal, Kurt; Filocamo, Mirella; Lochmüller, Hanns

    2015-01-01

    The EuroBioBank (EBB) network (www.eurobiobank.org) is the first operating network of biobanks in Europe to provide human DNA, cell and tissue samples as a service to the scientific community conducting research on rare diseases (RDs). The EBB was established in 2001 to facilitate access to RD biospecimens and associated data; it obtained funding from the European Commission in 2002 (5th framework programme) and started operation in 2003. The set-up phase, during the EC funding period 2003–2006, established the basis for running the network; the following consolidation phase has seen the growth of the network through the joining of new partners, better network cohesion, improved coordination of activities, and the development of a quality-control system. During this phase the network participated in the EC-funded TREAT-NMD programme and was involved in planning of the European Biobanking and Biomolecular Resources Research Infrastructure. Recently, EBB became a partner of RD-Connect, an FP7 EU programme aimed at linking RD biobanks, registries, and bioinformatics data. Within RD-Connect, EBB contributes expertise, promotes high professional standards, and best practices in RD biobanking, is implementing integration with RD patient registries and ‘omics' data, thus challenging the fragmentation of international cooperation on the field. PMID:25537360

  1. Trends in Health Disparities, Health Inequity, and Social Determinants of Health Research: A 17-Year Analysis of NINR, NCI, NHLBI, and NIMHD Funding.

    PubMed

    Kneipp, Shawn M; Schwartz, Todd A; Drevdahl, Denise J; Canales, Mary K; Santacroce, Sheila; Santos, Hudson P; Anderson, Ruth

    The theoretical landscape of health disparities research now emphasizes health inequities and the role that social determinants of health (SDOH) play in creating and perpetuating them. Whether National Institutes of Health (NIH) funding patterns reflect this theoretical shift is unknown. The aim of this study was to examine the National Institute of Nursing Research's (NINR) funding for research focused on health disparities, health inequities, and SDOH, relative to other key NIH institutes. Data on 32,968 projects funded by NINR, the National Cancer Institute, the National Heart, Lung, and Blood Institute, and the National Institute of Minority Health and Health Disparities (NIMHD) during the years 2000 through 2016 were downloaded from NIH RePORTER; those with health disparities, health inequity, or SDOH terms used in the abstract were identified. Descriptive statistics and a general linear model approach were used to assess differences in cumulative project counts and funding proportions, and funding trends over time. Overall, funding for health disparities projects was 14-19 times greater than for health inequity and SDOH projects and was more concentrated in centers and institutional training than in individual research projects. NINR's proportion of funding for disparities projects was consistently greater than that of the National Cancer Institute and the National Heart, Lung, and Blood Institute, but not for inequities and SDOH projects. NIMHD's proportion of funding for disparities, and inequities and SDOH projects (combined) was 2-30 times greater than that of other institutes. Over the 16-year period, funding for disparities, inequity, and SDOH projects each increased (all ps < .05); however, growth in inequities and SDOH funding was not evident in more recent years. Funding for projects focused on health equities and the SDOH lag behind theoretical shifts in the broader health disparities research arena. With the exception of NIMHD, there is a disconnect between funding for projects with a disparities orientation in institutional training and center projects relative to individual research projects. These trends have implications for nurse scientists seeking NIH funding to support health equity-oriented research.

  2. 75 FR 71104 - Lock Hydro Friends Fund XXXV; FFP Missouri 7, LLC; Dashields Hydro, LLC; Notice of Competing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-22

    .... 13735-000; Project No. 13756-000; Project No. 13779-000] Lock Hydro Friends Fund XXXV; FFP Missouri 7... Soliciting Comments, and Motions To Intervene November 15, 2010. On May 18, 2010, Lock Hydro Friends Fund.... Descriptions of the proposed Dashields Lock and Dam Projects: Lock Hydro Friends Fund XXXV's project (Project...

  3. Alternative Fuels Data Center

    Science.gov Websites

    State Energy Program (SEP) Funding The SEP provides grants to states to assist in designing receives SEP funding and manages all SEP-funded projects. States may also receive project funding from ) for SEP Special Projects. EERE distributes the funding through an annual competitive solicitation to

  4. The Drawbacks of Project Funding for Epistemic Innovation: Comparing Institutional Affordances and Constraints of Different Types of Research Funding

    ERIC Educational Resources Information Center

    Franssen, Thomas; Scholten, Wout; Hessels, Laurens K.; de Rijcke, Sarah

    2018-01-01

    Over the past decades, science funding shows a shift from recurrent block funding towards project funding mechanisms. However, our knowledge of how project funding arrangements influence the organizational and epistemic properties of research is limited. To study this relation, a bridge between science policy studies and science studies is…

  5. Patient safety in external beam radiotherapy, results of the ACCIRAD project: Recommendations for radiotherapy institutions and national authorities on assessing risks and analysing adverse error-events and near misses.

    PubMed

    Malicki, Julian; Bly, Ritva; Bulot, Mireille; Godet, Jean-Luc; Jahnen, Andreas; Krengli, Marco; Maingon, Philippe; Prieto Martin, Carlos; Skrobala, Agnieszka; Valero, Marc; Jarvinen, Hannu

    2018-05-02

    The ACCIRAD project, commissioned by the European Commission (EC) to develop guidelines for risk analysis of accidental and unintended exposures in external beam radiotherapy (EBRT), was completed in the year 2014. In 2015, the "General guidelines on risk management in external beam radiotherapy" were published as EC report Radiation Protection (RP)-181. The present document is the third and final report of the findings from the ACCIRAD project. The main aim of this paper is to describe the key features of the risk management process and to provide general guidelines for radiotherapy departments and national authorities on risk assessment and analysis of adverse error-events and near misses. The recommendations provided here and in EC report RP-181 are aimed at promoting the harmonisation of risk management systems across Europe, improving patient safety, and enabling more reliable inter-country comparisons. Copyright © 2018 Elsevier B.V. All rights reserved.

  6. Sustainability and integration of radioecology-position paper.

    PubMed

    Muikku, M; Beresford, N A; Garnier-Laplace, J; Real, A; Sirkka, L; Thorne, M; Vandenhove, H; Willrodt, C

    2018-03-01

    This position paper gives an overview of how the COMET project (COordination and iMplementation of a pan-European instrumenT for radioecology, a combined Collaborative Project and Coordination and Support Action under the EC/Euratom 7th Framework Programme) contributed to the integration and sustainability of radioecology in Europe via its support to and interaction with the European Radioecology ALLIANCE. COMET built upon the foundations laid by the FP7 project STAR (Strategic Network for Integrating Radioecology) Network of Excellence in radioecology. In close association with the ALLIANCE, and based on the Strategic Research Agenda (SRA), COMET developed innovative mechanisms for joint programming and implementation of radioecological research. To facilitate and foster future integration under a common federating structure, research activities developed within COMET were targeted at radioecological research needs identified in the SRA. Furthermore, COMET maintained and developed strong mechanisms for knowledge exchange, dissemination and training to enhance and maintain European capacity, competence and skills in radioecology. In the short term the work to promote radioecology will continue under the H2020 project EJP-CONCERT (European Joint Programme for the Integration of Radiation Protection Research). The EJP-CONCERT project (2015-2020) aims to develop a sustainable structure for promoting and administering joint programming and open research calls in the field of radiation protection research for Europe. In the longer term, radioecological research will be facilitated by the ALLIANCE. External funding is, however, required in order to be able to answer emerging research needs.

  7. 77 FR 16024 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-19

    ... that the Commission received the following electric corporate filings: Docket Numbers: EC12-78-000. Applicants: Algonquin Power Fund (America) Inc., Pocahontas Prairie Wind, LLC, Sandy Ridge Wind, LLC.... Comments Due: 5 p.m. ET 3/30/12. Take notice that the Commission received the following electric rate...

  8. Emergency Contraception in Post-Conflict Somalia: An Assessment of Awareness and Perceptions of Need.

    PubMed

    Gure, Faduma; Dahir, Mohammed Koshin; Yusuf, Marian; Foster, Angel M

    2016-03-01

    In conflict-affected settings such as Somalia, emergency contraception (EC) has the potential to serve as an important means of pregnancy prevention. Yet Somalia remains one of the few countries without a registered progestin-only EC pill. In 2014, we conducted a qualitative, multi-methods study in Mogadishu to explore awareness of and perceptions of need for EC. Our project included 10 semi-structured key informant interviews, 20 structured in-person interviews with pharmacists, and four focus group discussions with married and unmarried Somali women. Our findings reveal a widespread lack of knowledge of both existing family planning methods and EC. However, once we described EC, participants expressed enthusiasm for expanding access to post-coital contraception. Our results shed light on why Somalia continues to be a global exception with respect to an EC product and suggest possible politically and culturally acceptable and effective avenues for introducing EC into the health system. © 2016 The Population Council, Inc.

  9. 77 FR 12281 - Lock+ Hydro Friends Fund XLIII; FFP Project 53, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14181-000; Project No. 14195-000] Lock+ Hydro Friends Fund XLIII; FFP Project 53, LLC; Notice Announcing Filing Priority for... follows: 1. Lock+ Hydro Friends Fund XLIII, Project No. 14181-000. 2. FFP Project 53, LLC, Project No...

  10. 77 FR 12280 - Lock+ Hydro Friends Fund XLI; FFP Project 54, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14182-000; Project No. 14192-000] Lock+ Hydro Friends Fund XLI; FFP Project 54, LLC; Notice Announcing Filing Priority for... follows: 1. FFP Project 54, LLC, Project No. 14192-000. 2. Lock+ Hydro Friends Fund XLI, Project No. 14182...

  11. 77 FR 12280 - Lock+ Hydro Friends Fund XXXV; FFP Project 57, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14186-000; Project No. 14197-000] Lock+ Hydro Friends Fund XXXV; FFP Project 57, LLC;Notice Announcing Filing Priority for... follows: 1. Lock+ Hydro Friends Fund XXXV, Project No. 14186-000. 2. FFP Project 57, LLC, Project No...

  12. 77 FR 12279 - Lock+ Hydro Friends Fund XXXVIII; FFP Project 1, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14184-000; Project No. 14191-000] Lock+ Hydro Friends Fund XXXVIII; FFP Project 1, LLC; Notice Announcing Filing Priority for... follows: 1. Lock+ Hydro Friends Fund XXXVIII, Project No. 14184-000. 2. FFP Project 1, LLC, Project No...

  13. 23 CFR 661.39 - How are project cost overruns funded?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false How are project cost overruns funded? 661.39 Section 661... OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.39 How are project cost overruns funded? (a) A request for additional IRRBP funds for cost overruns on a specific bridge project must be submitted to...

  14. 23 CFR 661.39 - How are project cost overruns funded?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false How are project cost overruns funded? 661.39 Section 661... OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.39 How are project cost overruns funded? (a) A request for additional IRRBP funds for cost overruns on a specific bridge project must be submitted to...

  15. 23 CFR 661.39 - How are project cost overruns funded?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false How are project cost overruns funded? 661.39 Section 661... OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.39 How are project cost overruns funded? (a) A request for additional IRRBP funds for cost overruns on a specific bridge project must be submitted to...

  16. 23 CFR 661.39 - How are project cost overruns funded?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false How are project cost overruns funded? 661.39 Section 661... OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.39 How are project cost overruns funded? (a) A request for additional IRRBP funds for cost overruns on a specific bridge project must be submitted to...

  17. 23 CFR 661.39 - How are project cost overruns funded?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.39 How are project cost overruns funded? (a) A request for additional IRRBP funds for cost overruns on a specific bridge project must be submitted to... 23 Highways 1 2010-04-01 2010-04-01 false How are project cost overruns funded? 661.39 Section 661...

  18. Comparing Life-Cycle Costs of ESPCs and Appropriations-Funded Energy Projects: An Update to the 2002 Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shonder, John A; Hughes, Patrick; Atkin, Erica

    2006-11-01

    A study was sponsored by FEMP in 2001 - 2002 to develop methods to compare life-cycle costs of federal energy conservation projects carried out through energy savings performance contracts (ESPCs) and projects that are directly funded by appropriations. The study described in this report follows up on the original work, taking advantage of new pricing data on equipment and on $500 million worth of Super ESPC projects awarded since the end of FY 2001. The methods developed to compare life-cycle costs of ESPCs and directly funded energy projects are based on the following tasks: (1) Verify the parity of equipmentmore » prices in ESPC vs. directly funded projects; (2) Develop a representative energy conservation project; (3) Determine representative cycle times for both ESPCs and appropriations-funded projects; (4) Model the representative energy project implemented through an ESPC and through appropriations funding; and (5) Calculate the life-cycle costs for each project.« less

  19. Development of funding project risk management tools.

    DOT National Transportation Integrated Search

    2013-11-01

    Funding project risk management is a process for identifying, assessing, and prioritizing project funding risks. To plan to : minimize or eliminate the impact of negative events, one must identify what projects have higher risk to respond to potentia...

  20. 77 FR 9232 - Lock+ Hydro Friends Fund XXXV; FFP Project 57, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14186-000; Project No. 14197-000] Lock+ Hydro Friends Fund XXXV; FFP Project 57, LLC; Notice Announcing Preliminary Permit.... The applications were filed by Lock+ Hydro Friends Fund XXXV for Project No. 14186-000 and FFP Project...

  1. 77 FR 9915 - Lock+ Hydro Friends Fund XLIV; FFP Project 51, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-21

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14179-000; Project No. 14194-000] Lock+ Hydro Friends Fund XLIV; FFP Project 51, LLC; Notice Announcing Preliminary Permit.... The applications were filed by Lock+ Hydro Friends Fund XLIV for Project No. 14179-000 and FFP Project...

  2. Faces of the Recovery Act: 1366 Technologies

    ScienceCinema

    Sachs, Ely; Mierlo, Frank van; Obama, Barack

    2017-12-09

    LEXINGTON, MA - At 1366 Technologies, Ely Sachs and Frank van Mierlo are using ARPA-E Recovery Act funding to dramatically reduce the costs of solar panel production. To read more about the project: http://arpa-e.energy.gov/FundedProjects.aspx#1366 To see more projects funded by the Recovery Act through ARPA-E: http://arpa-e.energy.gov/FundedProjects.aspx

  3. Faces of the Recovery Act: 1366 Technologies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sachs, Ely; Mierlo, Frank van; Obama, Barack

    2010-01-01

    LEXINGTON, MA - At 1366 Technologies, Ely Sachs and Frank van Mierlo are using ARPA-E Recovery Act funding to dramatically reduce the costs of solar panel production. To read more about the project: http://arpa-e.energy.gov/FundedProjects.aspx#1366 To see more projects funded by the Recovery Act through ARPA-E: http://arpa-e.energy.gov/FundedProjects.aspx

  4. 24 CFR 1000.103 - How may IHBG funds be used for tenant-based or project-based rental assistance?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Housing Activities § 1000.103 How may IHBG funds be used for tenant-based or project-based rental assistance? (a) IHBG funds may be used for project-based or tenant-based rental assistance. (b) IHBG funds may be used for project-based or tenant-based rental assistance that is provided in a manner...

  5. 77 FR 14775 - Lock+ Hydro Friends Fund XLV, FFP Project 2, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14180-000, 14193-000] Lock+ Hydro Friends Fund XLV, FFP Project 2, LLC; Notice Announcing Filing Priority for Preliminary Permit...+ Hydro Friends Fund XLV Project No. 14180-000. 2. FFP Project 2, LLC Project No. 14193-000. Dated: March...

  6. 77 FR 12280 - Lock+ Hydro Friends Fund XL; FFP Project 56, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14189-000, 14198-000] Lock+ Hydro Friends Fund XL; FFP Project 56, LLC; Notice Announcing Filing Priority for Preliminary Permit...+ Hydro Friends Fund XL, Project No. 14189-000. 2. FFP Project 56, LLC, Project No. 14198-000. Dated...

  7. 77 FR 9232 - Lock+ Hydro Friends Fund XXXVIII; FFP Project 1, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14184-000; 14191-000] Lock+ Hydro Friends Fund XXXVIII; FFP Project 1, LLC; Notice Announcing Preliminary Permit Drawing The... filed by Lock+ Hydro Friends Fund XXXVIII for Project No. 14184-000 and FFP Project 1, LLC for Project...

  8. 77 FR 9230 - Lock+ Hydro Friends Fund XLV; FFP Project 2, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14180-000; 14193-000] Lock+ Hydro Friends Fund XLV; FFP Project 2, LLC; Notice Announcing Preliminary Permit Drawing The Commission... filed by Lock+ Hydro Friends Fund XLV for Project No. 14180-000 and FFP Project 2, LLC for Project No...

  9. 77 FR 12280 - Lock+ Hydro Friends Fund XXVIII; FFP Project 59, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14188-00o, 14200-000] Lock+ Hydro Friends Fund XXVIII; FFP Project 59, LLC; Notice Announcing Filing Priority for Preliminary Permit.... FFP Project 59, LLC, Project No. 14200-000. 2. Lock+ Hydro Friends Fund XXXVIII, Project No. 14188-000...

  10. 77 FR 12279 - Lock+ Hydro Friends Fund XLVII FFP Project 52, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14178-000, 14190-000] Lock+ Hydro Friends Fund XLVII FFP Project 52, LLC; Notice Announcing Filing Priority for Preliminary Permit...+ Hydro Friends Fund XLVII, Project No. 14178-000. 2. FFP Project 52, LLC, Project No. 14190-000. Dated...

  11. 77 FR 12281 - Lock+ Hydro Friends Fund XXXIV; FFP Project 58, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14187-000, 14199-000] Lock+ Hydro Friends Fund XXXIV; FFP Project 58, LLC; Notice Announcing Filing Priority for Preliminary Permit...+ Hydro Friends Fund XXXIV, Project No. 14187-000. 2. FFP Project 58, LLC, Project No. 14199-000. Dated...

  12. 77 FR 13318 - Lock+ Hydro Friends Fund IV, FFP Project 55, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14185-000, 14196-000] Lock+ Hydro Friends Fund IV, FFP Project 55, LLC; Notice Announcing Filing Priority for Preliminary Permit... Friends Fund IV: Project No. 14185-000. 2. FFP Project 55, LLC: Project No. 14196-000. Dated: February 29...

  13. 77 FR 12279 - Lock+ Hydro Friends Fund XLIV FFP Project 51, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14179-000, 14194-000] Lock+ Hydro Friends Fund XLIV FFP Project 51, LLC; Notice Announcing Filing Priority for Preliminary Permit...+ Hydro Friends Fund XLIV, Project No. 14179-000. 2. FFP Project 51, LLC, Project No. 14194-000. Dated...

  14. 10 CFR 603.520 - Reasonableness of total project funding.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Reasonableness of total project funding. 603.520 Section 603.520 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS TECHNOLOGY INVESTMENT AGREEMENTS Pre-Award Business Evaluation Total Funding § 603.520 Reasonableness of total project funding. In...

  15. ETICS: the international software engineering service for the grid

    NASA Astrophysics Data System (ADS)

    Meglio, A. D.; Bégin, M.-E.; Couvares, P.; Ronchieri, E.; Takacs, E.

    2008-07-01

    The ETICS system is a distributed software configuration, build and test system designed to fulfil the needs of improving the quality, reliability and interoperability of distributed software in general and grid software in particular. The ETICS project is a consortium of five partners (CERN, INFN, Engineering Ingegneria Informatica, 4D Soft and the University of Wisconsin-Madison). The ETICS service consists of a build and test job execution system based on the Metronome software and an integrated set of web services and software engineering tools to design, maintain and control build and test scenarios. The ETICS system allows taking into account complex dependencies among applications and middleware components and provides a rich environment to perform static and dynamic analysis of the software and execute deployment, system and interoperability tests. This paper gives an overview of the system architecture and functionality set and then describes how the EC-funded EGEE, DILIGENT and OMII-Europe projects are using the software engineering services to build, validate and distribute their software. Finally a number of significant use and test cases will be described to show how ETICS can be used in particular to perform interoperability tests of grid middleware using the grid itself.

  16. The Business of Childcare in Europe

    ERIC Educational Resources Information Center

    Penn, Helen

    2014-01-01

    This article is based on work undertaken for the European Commission (EC) as part of a wider project on what is termed "social services of general interest". The EC is currently engaged in considering what kind of legislative and quality assurance mechanisms might be promoted for those social services, which have been opened up to…

  17. 24 CFR 200.54 - Project completion funding.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 2 2012-04-01 2012-04-01 false Project completion funding. 200.54... Project completion funding. (a) Except as provided in paragraph (d) of this section, the mortgagor shall... conditions established by the Commissioner, where the required funding is to be provided by a grant or loan...

  18. 24 CFR 200.54 - Project completion funding.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 2 2011-04-01 2011-04-01 false Project completion funding. 200.54... Project completion funding. (a) Except as provided in paragraph (d) of this section, the mortgagor shall... conditions established by the Commissioner, where the required funding is to be provided by a grant or loan...

  19. State Approaches to Funding Dual Enrollment. ECS Education Policy Analysis

    ERIC Educational Resources Information Center

    Zinth, Jennifer

    2015-01-01

    Research shows that students who dually enroll are more likely to finish high school and succeed in postsecondary education than their peers with a similar grade point average (GPA), test scores, demographics, etc. Yet in many states, students and parents are largely--if not entirely--responsible for covering dual enrollment course costs, placing…

  20. Resources for Change: A Guide to Projects, 1978-79.

    ERIC Educational Resources Information Center

    Fund for the Improvement of Postsecondary Education (DHEW), Washington, DC.

    Descriptions are provided of the 175 projects supported by the Fund for the Improvement of Postsecondary Education in 1978-79. The projects address the broad range of educational needs represented in the proposals submitted to the Fund's Comprehensive Program. About half the projects are newly funded, and half are renewals. Project descriptions…

  1. 77 FR 12281 - Lock+ Hydro Friends Fund IV; FFP Project 55, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14185-000; Project No. 14196-000] Lock+ Hydro Friends Fund IV; FFP Project 55, LLC; Notice Announcing Preliminary Permit... County, Kentucky. The applications were filed by Lock+ Hydro Friends Fund IV for Project No. 14185-000...

  2. 77 FR 9230 - Lock+ Hydro Friends Fund XLVII; FFP Project 52, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Project No. 14178-000; Project No. 14190-000] Lock+ Hydro Friends Fund XLVII; FFP Project 52, LLC; Notice Announcing Preliminary Permit... County, Arkansas. The applications were filed by Lock+ Hydro Friends Fund XLVII for Project No. 14178-000...

  3. 77 FR 9232 - Lock+ Hydro Friends Fund XXXIV; FFP Project 58, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14187-000; Project No. 14199-000] Lock+ Hydro Friends Fund XXXIV; FFP Project 58, LLC; Notice Announcing Preliminary Permit... County, Kentucky. The applications were filed by Lock+ Hydro Friends Fund XXXIV for Project No. 14187-000...

  4. 13 CFR 308.1 - Use of funds in Projects constructed under projected cost.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Use of funds in Projects constructed under projected cost. 308.1 Section 308.1 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE PERFORMANCE INCENTIVES § 308.1 Use of funds in Projects constructed under...

  5. Results of nine Connecticut Cancer Partnership implementation projects.

    PubMed

    Morra, Marion E; Mowad, Linda Z; Hogarty, Lucinda Hill; Kettering, Shiu-Yu

    2012-01-01

    The Connecticut Cancer Partnership (Partnership), through funds from the Connecticut legislature, the AttorneyGeneral Fund and some limited federal funding, has spearheaded the implementation of a series of projects by Connecticut institutions and State of Connecticut departments. Among them are projects in prevention, detection, treatment, survivorship and end-of-life care, along with programs that target ethnic and uninsured populations. This article highlights funding sources, procedures for choosing projects and summaries for nine completed projects of interest to practicing physicians. It also includes a listing of additional projects currently underway. The use of shared funding among the State's partners highlights the energy of the Partnership in carrying out the common vision embodied in the Connecticut Cancer Plan.

  6. Building a multidisciplinary e-infrastructure for the NextData Community

    NASA Astrophysics Data System (ADS)

    Nativi, Stefano; Rorro, Marco; Mazzetti, Paolo; Fiameni, Giuseppe; Papeschi, Fabrizio; Carpenè, Michele

    2014-05-01

    In 2012, Italy decided to launch a national initiative called NextData (http://www.nextdataproject.it/): a national system for the retrieval, storage, access and diffusion of environmental and climate data from mountain and marine areas. NextData is funded by the Research and University Ministry, as a "Project of Interest". In 2013, NextData funded a "special project", the NextData System of Systems Infrastructure project (ND-SoS-Ina). The main objective is to design, build and operate in production the NextData multidisciplinary and multi-organizational e-infrastructure for the publication and sharing of its resources (e.g. data, services, vocabularies, models). SoS-Ina realizes the NextData general portal implementing the interoperability among the data archives carried out by NextData. The Florentine Division of the Institute of Atmospheric Pollution Research of CNR (CNR-IIA) and CINECA run the project. SoS-Ina (http://essi-lab.eu/nextdata/sosina/) decided to adopt a "System of Systems" (SoS) approach based on a brokering architecture. This has been pursued by applying the brokering technology first developed by the EC-FP7 EuroGEOSS project (http://www.eurogeoss.eu/broker/Pages/AbouttheEuroGEOSSBroker.aspx) and more recently consolidated by the international programme GEOSS (Global Earth Observation System of Systems) of GEO (Group oh Earth Observation) -see http://www.earthobservations.org/documents/geo_ix/20111122_geoss_implementation_highlights.pdf. The NextData general Portal architecture definition will proceed accordingly with the requirements elicited by user communities. The portal will rely on services and interfaces being offered by the brokering middleware and will be based on Liferay (http://www.liferay.com/). Liferay is free and open source, it provides many built-in applications for social collaboration, content and document management. Liferay is also configurable for high availability. The project considers three distinct phases and related milestones: (a) the first prototype of the NextData SoS infrastructure, implementing the core functionalities; (b) the consolidated version of the NextData SoS infrastructure, implementing advanced functionalities; (c) the final and operative NextData SoS infrastructure for data and information sharing and publication. An important outcome of the project will be the performances and scalability advancement of the current brokering and portal technologies, exploiting resources and middleware services provided by CINECA.

  7. 75 FR 75999 - Lock + Hydro Friends Fund XlVI; FFP Missouri 17, LLC; Solia 3 Hydroelectric, LLC; Three Rivers...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-07

    .... 13754-000; Project No. 13765-000; Project No. 13783-000; Project No. 13790-000] Lock + Hydro Friends..., and Motions To Intervene NOVEMBER 30, 2010. On May 18, 2010, Lock + Hydro Friends Fund XLVI, FFP... proposed Hildebrand Lock & Dam Projects: Lock+ Hydro Friends Fund XLVI's project (Project No. 13734-000...

  8. [Analysis of the application and funding projects of National Natural Science Foundation of China in the field of burns and plastic surgery from 2010 to 2016].

    PubMed

    Zhang, Z C; Dou, D; Wang, X Y; Xie, D H; Yan, Z C

    2017-02-20

    We analyzed the data of application and funding projects of the National Natural Science Foundation of China (NSFC) during 2010-2016 in the field of burns and plastic surgery and summarized the NSFC funding pattern, the research hotspots, and weaknesses in this field. The NSFC has funded 460 projects in the field of burns and plastic surgery, with total funding of RMB 227.96 million. The scientific issues involved in the funding projects include orthotherapy against malformations, wound repair, basic research of burns, skin grafting, scars prevention, and regeneration of hair follicle and sweat glands. The research techniques involved in the funding projects are diversified. NSFC plays an important role in the scientific research and talents training in the field of burns and plastic surgery.

  9. Funding anatomic pathology research: a retrospective analysis of an intramural funding mechanism.

    PubMed

    McDaniel, Andrew; Fullen, Douglas R; Cho, Kathleen R; Lucas, David R; Giordano, Thomas J; Greenson, Joel; Lieberman, Andrew P; Kunju, Lakshmi P; Myers, Jeffrey L; Roh, Michael H

    2013-09-01

    In 2006, the department of pathology at our institution established an intramural research funding mechanism to support anatomic pathology research projects for faculty and trainee development. A review committee consisting of faculty members with diverse academic interests evaluated applications; proposals were eligible for a maximum award amount of $30 000 per project with a maximum program cost of $150 000 annually. To report our experience based on a retrospective review of the research proposals submitted to the committee since the inception of the Anatomic Pathology Research Fund and evaluate the outcomes of the funded projects. We retrospectively analyzed all project applications that were received by the committee. Outcome data were collected by reviewing progress reports, abstracts for national and international meetings, PubMed search results, and/or direct communication with investigators. To date, a total of 59 individual projects have been awarded funding, for a total amount of $349 792, with an average award amount of $5381 per project. A total of 26 faculty members have secured funding for projects through this mechanism, and 27 resident and fellow trainees have been engaged in the funded projects. Spanning 11 subspecialty disciplines in anatomic pathology, 32 abstracts (54%) have been presented at national meetings and 26 (44%) have been published in the peer-reviewed literature to date. One project generated data used to secure an extramural (R01) grant. Our funding mechanism could serve as a model used by other academic departments to support research activities, thereby fostering faculty development through scholarly activities.

  10. Twinning European and South Asian river basins to enhance capacity and implement adaptive integrated water resources management approaches - results from the EC-project BRAHMATWINN

    NASA Astrophysics Data System (ADS)

    Flügel, W.-A.

    2011-04-01

    The EC-project BRAHMATWINN was carrying out a harmonised integrated water resources management (IWRM) approach as addressed by the European Water Initiative (EWI) in headwater river systems of alpine mountain massifs of the twinning Upper Danube River Basin (UDRB) and the Upper Brahmaputra River Basins (UBRB) in Europe and Southeast Asia respectively. Social and natural scientists in cooperation with water law experts and local stakeholders produced the project outcomes presented in Chapter 2 till Chapter 10 of this publication. BRAHMATWINN applied a holistic approach towards IWRM comprising climate modelling, socio-economic and governance analysis and concepts together with methods and integrated tools of applied Geoinformatics. A detailed description of the deliverables produced by the BRAHMATWINN project is published on the project homepage http://www.brahmatwinn.uni-jena.de.

  11. 42 CFR 59.208 - Use of project funds.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false Use of project funds. 59.208 Section 59.208 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS GRANTS FOR FAMILY PLANNING SERVICES Grants for Family Planning Service Training § 59.208 Use of project funds. (a) Any funds granted...

  12. 42 CFR 59.208 - Use of project funds.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 1 2013-10-01 2013-10-01 false Use of project funds. 59.208 Section 59.208 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS GRANTS FOR FAMILY PLANNING SERVICES Grants for Family Planning Service Training § 59.208 Use of project funds. (a) Any funds granted...

  13. 42 CFR 59.208 - Use of project funds.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Use of project funds. 59.208 Section 59.208 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS GRANTS FOR FAMILY PLANNING SERVICES Grants for Family Planning Service Training § 59.208 Use of project funds. (a) Any funds granted...

  14. 42 CFR 59.208 - Use of project funds.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false Use of project funds. 59.208 Section 59.208 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS GRANTS FOR FAMILY PLANNING SERVICES Grants for Family Planning Service Training § 59.208 Use of project funds. (a) Any funds granted...

  15. 42 CFR 59.208 - Use of project funds.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 1 2012-10-01 2012-10-01 false Use of project funds. 59.208 Section 59.208 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS GRANTS FOR FAMILY PLANNING SERVICES Grants for Family Planning Service Training § 59.208 Use of project funds. (a) Any funds granted...

  16. [The analysis on the funding of Natural Science Foundation of China for acupuncture projects from 2005 to 2015].

    PubMed

    Deng, Hongyong; Xu, Ji

    2017-05-12

    The funding of Natural Science Foundation of China (NSFC) for acupuncture projects from 2005 to 2015 was summarized and analyzed. The results indicated during past 11 years, 711 projects regarding acupuncture were funded by NSFC, with a total of 281 million RMB, accounting for 12.39% in TCM projects. It was concluded the funding for acupuncture projects was increased year by year, but was still relatively weak; in addition, the funding was unbalanced in different areas and organizations, mainly in Beijing, Shanghai, Sichuan, Guangdong, Tianjin, and the continuity and variability both existed in research content and direction.

  17. 77 FR 9230 - Lock+ Hydro Friends Fund XLIII; FFP Project 53, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14181-000; 14195-000] Lock+ Hydro Friends Fund XLIII; FFP Project 53, LLC; Notice Announcing Preliminary Permit Drawing The... applications were filed by Lock+ Hydro Friends Fund XLIII for Project No. 14181-000, and FFP Project 53, LLC...

  18. 77 FR 13317 - Lock+ Hydro Friends Fund XVIII, Upper Hydroelectric, LLC, FFP Project 95, LLC, Riverbank Hydro No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14261-000, 14268-000, 14277-000, 14281-000] Lock+ Hydro Friends Fund XVIII, Upper Hydroelectric, LLC, FFP Project 95, LLC.... Lock+ Hydro Friends Fund XVIII: Project No. 14261-000. 2. Riverbank Hydro No. 25, LLC: Project No...

  19. 77 FR 9231 - Lock+ Hydro Friends Fund XL; FFP Project 56, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14189-000; 14198-000] Lock+ Hydro Friends Fund XL; FFP Project 56, LLC; Notice Announcing Preliminary Permit Drawing The Commission... applications were filed by Lock+ Hydro Friends Fund XL for Project No. 14189-000 and FFP Project 56, LLC for...

  20. 77 FR 13316 - FFP Project 91, LLC, Riverbank Hydro No. 23, LLC, Lock+ Hydro Friends Fund III; Notice Announcing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14275-000, 14279-000, 14282-000] FFP Project 91, LLC, Riverbank Hydro No. 23, LLC, Lock+ Hydro Friends Fund III; Notice.... 2. Riverbank Hydro No. 23, LLC: Project No. 14279-000. 3. Lock+ Hydro Friends Fund III: Project No...

  1. 77 FR 9230 - Riverbank Hydro No. 1, LLC; Lock+ Hydro Friends Fund XXXVII; Qualified Hydro 20, LLC; Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14131-000; Project No. 14138-000; Project No. 14135-000] Riverbank Hydro No. 1, LLC; Lock+ Hydro Friends Fund XXXVII; Qualified... Hydro No. 1, LLC for Project No. 14131-000, Lock+ Hydro Friends Fund XXXVII for Project No. 14138- 000...

  2. Active Aging and Elderly's Quality of Life: Comparing the Impact on Literature of Projects Funded by the European Union and USA.

    PubMed

    Kirilov, I; Atzeni, M; Perra, A; Moro, D; Carta, M G

    2018-01-01

    The objective of this research is to verify whether European projects on Active Aging (AA) and Elderly Quality of Life (Qol) funded by the Seventh Framework Programme (FP7) produce an impact on literature similar to projects funded by the National Health Institute (NHI) of the United States on international literature using well-known bibliometric indicators. This effort may be useful in developing standardized and replicable procedures. Fifteen randomly selected projects on AA and Elderly Qol concluded in August 2017 and funded by FP7 were compared to similar projects funded by the US NHI with reference to papers published (Scopus and Scholar), papers published in Q1 journals, and the number of citations of the papers linked to the projects. In all the indicators considered, the European projects showed no difference with the US NHI projects. The EU-funded AA and Qol Elderly projects have an impact on scientific literature comparable to projects funded in the United States by the NHI Agency.Our results are consistent with the data on general medical research, which indicates that, European research remains at a high level of competitiveness.In this experimental study, our methodology appeared to be convincing and reliable and it could be applied to the extent of the impact of more extensive research areas.Our research did not evaluate the relationship between funding required by research and scientific productivity.

  3. 23 CFR 505.15 - Full funding grant agreement.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... MANAGEMENT PROJECTS OF NATIONAL AND REGIONAL SIGNIFICANCE EVALUATION AND RATING § 505.15 Full funding grant agreement. (a) A proposed project may not be funded under this program unless the Secretary finds that the project meets the requirements of this part and there is a reasonable likelihood that the project will...

  4. 40 CFR 149.111 - Funding to redesigned projects.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PROGRAMS (CONTINUED) SOLE SOURCE AQUIFERS Review of Projects Affecting the Edwards Underground Reservoir, A Designated Sole Source Aquifer in the San Antonio, Texas Area § 149.111 Funding to redesigned projects. After... 40 Protection of Environment 22 2010-07-01 2010-07-01 false Funding to redesigned projects. 149...

  5. Ralphs Grocery EC-Diesel Truck Fleet: Final Results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    2003-02-01

    DOE's Office of Heavy Vehicle Technologies sponsored a research project with Ralphs Grocery Company to collect and analyze data on the performance and operation of 15 diesel trucks fueled with EC-Diesel in commercial service. These trucks were compared to 5 diesel trucks fueled with CARB diesel and operating on similar routes. This document reports this evaluation.

  6. 2015 Project Portfolio: Solid-State Lighting

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    none,

    2015-01-30

    Overview of SSL projects currently funded by DOE, and those previously funded but since completed. Each profile includes a brief technical description, as well as information about project partners, funding, and the research period. This report is updated annually.

  7. 2017 Project Portfolio: Solid-State Lighting

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2017-01-02

    Overview of SSL projects currently funded by DOE, and those previously funded but since completed. Each profile includes a brief technical description, as well as information about project partners, funding, and the research period. This report is updated annually.

  8. A call for an urgent ban on E-cigarettes in India--a race against time.

    PubMed

    Kaur, Jagdish; Rinkoo, Arvind Vashishta

    2015-06-01

    Being the second largest consumer of tobacco in the world and with more than 65% of its population below the age of 35, India would face electronic cigarettes (ECs) as an enormous public health challenge in future. In the absence of established facilities for tobacco cessation in the country, ECs may provide an additional opportunity for the industry to project itself as a harm-reduction crusader. Regulating ECs as tobacco products or as drugs is not a prudent option in the Indian context. Banning ECs seems to be the most plausible approach at present. However, in the long run, India should be open to new research. More significantly, policy makers in India should be wary of the lead time before a ban is implemented-a shorter intervening period could ensure that a well-established, better politically connected and more defiant EC industry, aggressively promoting ECs to Indian youth, never becomes a reality. © The Author(s) 2014.

  9. Advanced Reactor Technology/Energy Conversion Project FY17 Accomplishments.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rochau, Gary E.

    The purpose of the ART Energy Conversion (EC) Project is to provide solutions to convert the heat from an advanced reactor to useful products that support commercial application of the reactor designs.

  10. 75 FR 73064 - Lock Hydro Friends Fund XLI; Allegheny 7 Hydro, LLC; Notice of Competing Preliminary Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-29

    .... 13777-000] Lock Hydro Friends Fund XLI; Allegheny 7 Hydro, LLC; Notice of Competing Preliminary Permit..., 2010, Lock Hydro Friends Fund XLI, and Allegheny 7 Hydro, LLC filed applications, pursuant to section 4.... 7 Projects Lock Hydro Friends Fund XLI's project (Project No. 13736-000) would consist of: (1) Two...

  11. Progress in animal experimentation ethics: a case study from a Brazilian medical school and from the international medical literature.

    PubMed

    Ramalli, Edvaldo Luiz; Ho, Wanli; Alves, Mônica; Rocha, Eduardo Melani

    2012-09-01

    This study describes in Brazil and in the global biomedical community the time course of the development of animal research welfare guidelines. The database of the Ethics Committee of the Faculty of Medicine of Ribeirao Preto (EC/FMRP-USP), Brazil, was surveyed since its inception in 2002 as the regulations became more stringent to provide better protection of animal research welfare at this institution. Medline database was evaluated to identify the number of publications in the period between 1968 and 2008 that used research animals and were in compliance with established ethics guidelines. The EC/FMRP-USP evaluated 979 projects up until 2009. Most of the applications came from Department of Physiology and the most frequently requested species was the rat. In 2004, national research funding agencies started to request prior approval from institutional review ethics committees prior to application review and this requirement became federal law in Brazil in 2008. The analysis of international publications revealed a relative reduction in studies involving research animals (18% in 1968 to 7.5% in 2008). The present work showed that in the last four decades major changes occurred in the guidelines dictating use of research animals occurred and they are being adopted by developing countries. Moreover, animal welfare concern in the scientific community preceded the introduction of journal guidelines for this purpose. Furthermore, in Brazil it was anticipated that laws were needed to protect animal research welfare from being not upheld.

  12. 23 CFR 661.43 - Can other sources of funds be used to finance a queued project in advance of receipt of IRRBP funds?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Can other sources of funds be used to finance a queued project in advance of receipt of IRRBP funds? 661.43 Section 661.43 Highways FEDERAL HIGHWAY... PROGRAM § 661.43 Can other sources of funds be used to finance a queued project in advance of receipt of...

  13. 23 CFR 661.43 - Can other sources of funds be used to finance a queued project in advance of receipt of IRRBP funds?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Can other sources of funds be used to finance a queued project in advance of receipt of IRRBP funds? 661.43 Section 661.43 Highways FEDERAL HIGHWAY... PROGRAM § 661.43 Can other sources of funds be used to finance a queued project in advance of receipt of...

  14. 23 CFR 661.43 - Can other sources of funds be used to finance a queued project in advance of receipt of IRRBP funds?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Can other sources of funds be used to finance a queued project in advance of receipt of IRRBP funds? 661.43 Section 661.43 Highways FEDERAL HIGHWAY... PROGRAM § 661.43 Can other sources of funds be used to finance a queued project in advance of receipt of...

  15. 23 CFR 661.43 - Can other sources of funds be used to finance a queued project in advance of receipt of IRRBP funds?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Can other sources of funds be used to finance a queued project in advance of receipt of IRRBP funds? 661.43 Section 661.43 Highways FEDERAL HIGHWAY... PROGRAM § 661.43 Can other sources of funds be used to finance a queued project in advance of receipt of...

  16. 24 CFR 401.472 - Rehabilitation funding.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 2 2013-04-01 2013-04-01 false Rehabilitation funding. 401.472... (MARK-TO-MARKET) Restructuring Plan § 401.472 Rehabilitation funding. (a) Sources of funds—(1) Project accounts. The Restructuring Plan for funding rehabilitation must include funds from the project's residual...

  17. Fostering creativity: how the Duke Graduate Medical Education Quasi-Endowment encourages innovation in GME.

    PubMed

    Andolsek, Kathryn M; Murphy, Gwendolyn; Nagler, Alisa; Moore, Peggy R; Schlueter, Joanne; Weinerth, John L; Cuffe, Michael S; Dzau, Victor J

    2013-02-01

    The Duke Medicine Graduate Medical Education Quasi-Endowment, established in 2006, provides infrastructure support and encourages educational innovation. The authors describe Duke's experience with the "grassroots innovation" part of the fund, the Duke Innovation Fund, and discuss the Innovation Fund's processes for application, review, and implementation, and also outcomes, impact, and intended and unintended consequences.In the five years of the Innovation Fund described (2007-2011), 105 projects have been submitted, and 78 have been funded. Thirty-seven projects have been completed. Approved funding ranged from $2,363 to $348,750, with an average award of $66,391. This represents 42% of funding originally requested. Funding could be requested for a period of 6 months to 3 years. The average duration of projects was 27 months, with a range from 6 months to 36 months. Eighty percent of projects were completed on time. Two projects were closed because of lack of progress and failure to adhere to reporting requirements. Thirty-nine are ongoing.Program directors report great success in meeting project outcomes and concrete impacts on resident and faculty attitudes and performance. Ninety-two percent report that their projects would have never been accomplished without this funding. Projects have resulted in at least 68 posters, abstracts, and peer-reviewed presentations. At least 12 peer-reviewed manuscripts were published.There has been tremendous diversity of projects; all 13 clinical departments have been represented. Interdepartmental and intradepartmental program cooperation has increased. This modest seed money has resulted in demonstrable sustainable impacts on teaching and learning, and increased morale and scholarly recognition.

  18. [Analysis of projects received and funded in fields of emergency and intensive care medicine/trauma/burns/plastic surgery from National Natural Science Foundation of China during 2010-2013].

    PubMed

    Xiong, Kun; Wang, Linlin; Chen, Xulin; Cao, Yongqian; Xiang, Chuan; Xue, Lixiang; Yan, Zhangcai

    2014-01-01

    To summarized the projects received and funded in the fields of emergency and intensive care medicine/trauma/burns/plastic surgery from National Natural Science Foundation of China (NSFC) during 2010-2013, put forward the thinking and perspective of this future trend in these fields. The number of the funded project and total funding in the fields of emergency and intensive care medicine/trauma/burns/plastic surgery from NSFC during 2010-2013 had been statistical analyzed, in the meantime, the overview situation of various branches in basic research and further preliminary analysis the research frontier and hot issues have been analyzed. (1) The number of funded project were 581 in H15 of NSFC during 2010-2013, total funding reached to 277.13 million RMB, including 117 projects in H1511 (emergency and intensive care medicine/trauma/burns/plastic surgery and other science issue), 96 projects in H1507 (wound healing and scar), 88 projects in H1502 (multi-organ failure), 71 projects in H1505 (burn), 61 projects in H1504 (trauma). (2) The top 10 working unit for project funding in the field of emergency and intensive care medicine/trauma/burns/plastic surgery present as Third Military Medical University (70), Shanghai Jiao tong University (69), Second Military Medical University (40), Chinese PLA General Hospital (36), Forth Military Medical University (35), Zhejiang University (22), Sun Yat-Sen University (18), Southern Medical University (14), China Medical University (11), Capital Medical University (11) respectively, the number of funded project positive correlated with funding. (3) The funded research field in H15 covered almost all important organs and system injury or repair research, our scientists reached a fairly high level in some research field, for example, sepsis, trauma, repair, et al. "Sepsis" was funded 112 projects in H15 for 4 years, the growth rate became rapid and stable comparing to shock, burns and cardiopulmonary resuscitation funded projects' number. "Emergency and intensive care medicine/trauma/burns" research fields related to heart, lung, bone/cartilage/muscle, stomach/intestinal/liver, brain/spinal cord/peripheral nerve and other tissues/organs. The number of funded projects in plastic surgery related research fields in angioma and flap related projects were down below to 3 projects, but the number of funded project in wounds, scar repair related research field were more than other fields relatively. (4) In frontier and research hot issue, the funded rate represent as 23.8%, 21.4%, 19.0% and 23.9% in stem cell related research fields in 4 years respectively. The funded rate average to 20.9% in epigenetic related research fields for four years, the funded rate achieved to break through "zero" in autophagy related research fields, the total rate raised to 32.6% from 2011 to 2013. The funded number and funding were raised rapidly in the fields of emergency and intensive care medicine/trauma/burns/plastic surgery from NSFC. The application for each proposal should be focus on concise or upgrade the scientific issues to improve the quality. The depth or systematic in content and interdisciplinary research fields (e.g. immunology) should be paid attention to. Sepsis, trauma and burns will be the main stream direction in future in the fields of emergency and intensive care medicine/trauma/burns/plastic surgery. The fields of wound healing and scar, surface organ defects, damage, repair and regeneration, surface tissue/organ transplantation and reconstruction, craniofacial deformities and correction are important develop directions in future work.

  19. Funding for Computer-Assisted Instruction Projects.

    ERIC Educational Resources Information Center

    Corn, Milton

    1994-01-01

    An informal survey of individuals and a search of MEDLINE literature sought information on funding sources for computer-assisted instruction projects in dental, medical, and nursing education. General patterns are outlined, and suggestions are made for locating project funding. (MSE)

  20. 45 CFR 2551.111 - Under what conditions can an agency or organization sponsor a Senior Companion project without...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... organization sponsor a Senior Companion project without Corporation funding? 2551.111 Section 2551.111 Public... SENIOR COMPANION PROGRAM Non-Corporation Funded SCP Projects § 2551.111 Under what conditions can an agency or organization sponsor a Senior Companion project without Corporation funding? An eligible agency...

  1. 78 FR 49509 - Lock+ Hydro Friends Fund XXX, LLC; FFP Project 121, LLC; Notice Announcing Preliminary Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-14

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Project No. 13625-003; Project No. 14504-000] Lock+ Hydro Friends Fund XXX, LLC; FFP Project 121, LLC; Notice Announcing Preliminary Permit... and Jefferson County, Ohio. The applications were filed by Lock+ Hydro Friends Fund XXX, LLC for...

  2. 77 FR 9231 - Lock+ Hydro Friends Fund XXVIII; FFP Project 59, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14188-000; 14200-000] Lock+ Hydro Friends Fund XXVIII; FFP Project 59, LLC; Notice Announcing Preliminary Permit Drawing The.... The applications were filed by Lock+ Hydro Friends Fund XXVIII for Project No. 14188-000 and FFP...

  3. 24 CFR 965.305 - Funding.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Funding. 965.305 Section 965.305... LEASED PROJECTS-GENERAL PROVISIONS Energy Audits and Energy Conservation Measures § 965.305 Funding. (a... modernization program, for funding from any available development funds in the case of projects still in...

  4. 24 CFR 965.305 - Funding.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 4 2013-04-01 2013-04-01 false Funding. 965.305 Section 965.305... LEASED PROJECTS-GENERAL PROVISIONS Energy Audits and Energy Conservation Measures § 965.305 Funding. (a... modernization program, for funding from any available development funds in the case of projects still in...

  5. 24 CFR 965.305 - Funding.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 4 2012-04-01 2012-04-01 false Funding. 965.305 Section 965.305... LEASED PROJECTS-GENERAL PROVISIONS Energy Audits and Energy Conservation Measures § 965.305 Funding. (a... modernization program, for funding from any available development funds in the case of projects still in...

  6. 24 CFR 965.305 - Funding.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 4 2014-04-01 2014-04-01 false Funding. 965.305 Section 965.305... LEASED PROJECTS-GENERAL PROVISIONS Energy Audits and Energy Conservation Measures § 965.305 Funding. (a... modernization program, for funding from any available development funds in the case of projects still in...

  7. 24 CFR 965.305 - Funding.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Funding. 965.305 Section 965.305... LEASED PROJECTS-GENERAL PROVISIONS Energy Audits and Energy Conservation Measures § 965.305 Funding. (a... modernization program, for funding from any available development funds in the case of projects still in...

  8. Response to William T. Hartman: Funding Models for Special Education.

    ERIC Educational Resources Information Center

    Sage, Daniel

    1992-01-01

    This response to EC 604 970 focuses on how costs of special education are to be shared among all applicable agencies. Controversy is noted in payment for services for such populations as preschool children, "aging-out" individuals, and individuals with severe disabilities. States are urged to consider these issues in fiscal policy development.…

  9. Mobility as a Continuum: European Commission Mobility Policies for Schools and Higher Education

    ERIC Educational Resources Information Center

    Dvir, Yuval; Yemini, Miri

    2017-01-01

    This study explores the rationale and aims of European Commission (EC) mobility programmes for schools and higher education systems, namely the Comenius and the European Action Scheme for the Mobility of University Students (ERASMUS) funding schemes. Our findings indicate that the aims, rationales and means of mobility programmes for the school…

  10. 78 FR 34092 - Lock+ Hydro Friends Fund XXX, LLC; FFP Project 121, LLC; Notice of Competing Preliminary Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-06

    .... 14504-000] Lock+ Hydro Friends Fund XXX, LLC; FFP Project 121, LLC; Notice of Competing Preliminary... Applications Lock+ Hydro Friends Fund XXX, LLC and FFP Project 121, LLC filed preliminary permit applications... regular business day. See id. at 385.2001(a)(2). Lock+ Hydro Friends Fund XXX, LLC's application is for a...

  11. 77 FR 13317 - Lock+ Hydro Friends Fund XII, BOST2, LLC, et al.; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-06

    ... al.] Lock+ Hydro Friends Fund XII, BOST2, LLC, et al.; Notice Announcing Filing Priority for Preliminary Permit Applications Project No. Lock+ Hydro Friends Fund XII 14260-000 BOST2, LLC 14264-000.... 2. BOST2, LLC: Project No. 14264-000. 3. Lock+ Hydro Friends Fund XII: Project No. 14260-000. 4...

  12. Overview of the StratoClim Asian Monsoon Aircraft Campaign: Strategy, Instrumentation and preliminary Results

    NASA Astrophysics Data System (ADS)

    Stroh, F.

    2017-12-01

    The StratoClim Aircraft Field Campaign employing the high-flying research aircraft M55 Geophysica was carried out from mid July to mid August of 2017 from Kathmandu, Nepal, covering the airspace of Nepal, India, Bangladesh and Myanmar in the frame of the EC FP7 funded StratoClim project (see the Rex. et al. overview in this session). In order to sample the first detailed data set on climate relevant processes of the Asian Summer Monsoon anticyclone a comprehensive chemical and aerosol payload of more than 2 metric tons consisting of 26 different instrumets was flown to altitudes in excess of 20km to measure remote sensing and in-situ data on dynamical, chemical, and micro-chemical processes governing this experimentally underresearched atmospheric domain. An overview of the instrumentation, observation strategies, and preliminary results on open challenges as the horizontal and vertical trace gas and aerosol structures, effects of convective events and the ATAL will be given.

  13. Observation of topological states in an optical Raman lattice with ultracold fermions

    NASA Astrophysics Data System (ADS)

    Song, Bo; He, Chengdong; Zhang, Long; Poon, Ting Fung Jeffrey; Hajiyev, Elnur; Ren, Zejian; Seo, Bojeong; Zhang, Shanchao; Liu, Xiong-Jun; Jo, Gyu-Boong

    2017-04-01

    The spin-orbit coupling with cold atoms, especially in optical lattices, provides a versatile platform to investigate the intriguing topological matters. In this talk, we will present the realization of one-dimensional spin-dependent lattice dressed by the periodic Raman field. Ultracold 173Yb fermions loaded into an optical Raman lattice reveal non-trivial spin textures due to the band topology, by which we measured topological invariants and determined a topological phase transition. In addition, we explored the non-equilibrium quench dynamics between the topological and the trivial states by suddenly changing the band topology of the optical Raman lattice. The optical Raman lattice demonstrated here opens a new avenue to study the spin-orbit coupling physics and furthermore to realize novel quantum matters such as symmetry-protected topological states. Funded by Croucher Foundation and Research Grants Council (RGC) of Hong Kong (Project ECS26300014, GRF16300215, GRF16311516, and Croucher Innovation Grants); MOST (Grant No. 2016YFA0301604) and NSFC (No. 11574008).

  14. Effect of combined platinum and electron on the temperature dependence of forward voltage in fast recovery diode

    NASA Astrophysics Data System (ADS)

    Jia, Yun-Peng; Zhao, Bao; Yang, Fei; Wu, Yu; Zhou, Xuan; Li, Zhe; Tan, Jian

    2015-12-01

    The temperature dependences of forward voltage drop (VF) of the fast recovery diodes (FRDs) are remarkably influenced by different lifetime controlled treatments. In this paper the results of an experimental study are presented, which are the lifetime controls of platinum treatment, electron irradiation treatment, and the combined treatment of the above ones. Based on deep level transient spectroscopy (DLTS) measurements, a new level E6 (EC-0.376 eV) is found in the combined lifetime treated (CLT) sample, which is different from the levels of the individual platinum and electron irradiation ones. Comparing the tested VF results of CLT samples with the others, the level E6 is responsible for the degradation of temperature dependence of the forward voltage drop in the FRD. Project supported by the Doctoral Fund of Ministry of Education of China (Grant No. 20111103120016) and the State Grid Corporation of China Program of Science and Technology, China (Grant No. 5455DW140003).

  15. An innovative program to fund health-oriented student projects and research.

    PubMed

    Bybee, Ronald F; Thompson, Sharon E

    2004-01-01

    The price of a university education has increased over the years. As a result, students often graduate with thousands of dollars of debt. Conducting research or developing class projects that require personal expenditures can be overwhelming, if not impossible. Participation in research and in developing projects can enhance a student's educational experience. In an effort to address cost issues and provide an optimal learning experience for all students through participation in projects and research, the College of Health Sciences at the University of Texas at El Paso (UTEP) collaborated with a regional foundation to fund health-oriented students' projects and research. Approximately 100 projects have been funded in amounts from 200 dollars to 10,000 dollars at UTEP. Similar programs can be replicated at other US universities. Establishing a general fund and identifying contributors may be a viable option, although finding a foundation or agency to fund the project poses a challenge.

  16. Fiscal Year 2011 Afghanistan Infrastructure Fund Projects Are Behind Schedule and Lack Adequate Sustainment Plans

    DTIC Science & Technology

    2012-07-30

    interconnected subset ofUSATD Economic Support Fund ( ESl -") projects, which arc essential to meet program ol~jcctives. Under the program, DOS and US AID...with conunent: The congressional reporting requirements in the KDAA cover AIF funded projects, whether executed hy DoD or DOS. ESl ’-tunded projects

  17. 76 FR 74779 - SV Hydro LLC; Coffeeville LLC; FFP Project 99 LLC; Lock Hydro Friends Fund XIV; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-01

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14298-000; 14299-000; 14301-000; 14302-000] SV Hydro LLC; Coffeeville LLC; FFP Project 99 LLC; Lock Hydro Friends Fund XIV... (Coffeeville), FFP Project 99 LLC (FFP 99), and Lock Hydro Friends Fund XIV (Lock Hydro) filed preliminary...

  18. 77 FR 9231 - Lock+ Hydro Friends Fund IV; FFP Project 55, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14185-000; 14196-000] Lock+ Hydro Friends Fund IV; FFP Project 55, LLC; Notice Announcing Preliminary Permit Drawing The Commission..., Kentucky. The applications were filed by Lock+ Hydro Friends Fund IV for Project No. 14185-000 and FFP...

  19. 76 FR 67720 - Lock+ Hydro Friends Fund XXXV; Riverbank Hydro No. 4, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-02

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14136-000; Project No. 14139-000] Lock+ Hydro Friends Fund XXXV; Riverbank Hydro No. 4, LLC; Notice Announcing Filing Priority... follows: 1. Lock+ Hydro Friends Fund XXXV--Project No. 14136-000 2. Riverbank Hydro No. 4, LLC--Project No...

  20. 77 FR 10740 - Lock+ Hydro Friends Fund VIII, FFP Project 92, LLC, Riverbank Hydro No. 24, LLC; Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14262-000, 14276-000, 14280-000] Lock+ Hydro Friends Fund VIII, FFP Project 92, LLC, Riverbank Hydro No. 24, LLC; Notice... Counties, Kentucky. The applications were filed by Lock+ Hydro Friends Fund VIII for Project No. 14262-000...

  1. 76 FR 67168 - Riverbank Hydro No. 19 LLC; Lock Hydro Friends Fund XXXIV; FFP Project 59 LLC; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14176-000, 14188-000, 14200-000] Riverbank Hydro No. 19 LLC; Lock Hydro Friends Fund XXXIV; FFP Project 59 LLC; Notice of..., Lock Hydro Friends Fund XXXIV (Lock Hydro), and FFP Project 59 LLC (FFP 59) filed preliminary permit...

  2. The $$ Game: A Guidebook on the Funding of Law-Related Educational Programs. Working Notes, No. 7.

    ERIC Educational Resources Information Center

    White, Charles J., III, Ed.

    This document addresses itself to the securing of funds necessary to maintain or fund law-related education projects. Drawing on the expertise of project directors who have been successful in securing funds, this document was put together as a guide to the funding process. Essays provide guidance to locating funding sources, writing proposals,…

  3. Elemental and Organic Carbon Measurements at the Kosetice Observatory, Czech Republic within EU Projects in 2009-2014

    NASA Astrophysics Data System (ADS)

    Vana, M.; Holubova, A.; Cech, J.

    2016-12-01

    Carbonaceous aerosol (TC) is a complex mixture of many organics (OC fraction) and elemental carbon (EC). EC is a product of anthropogenic activities, especially incomplete combustion of fossil fuels by transport, heating, power plants, wood and biomass burning and agriculture activities. EC could have larger health impact than other PM constituents (Cassee et al., 2013). Carbonaceous aerosols also play an important role in climate change (Boucher et al., 2013). Kosetice Observatory, operated by the Czech Hydrometeorological Institute has been carrying out long-term air quality monitoring at the background scale the Czech Republic since 1988. Regular EC-OC measurement has been implementing within EU-projects EUSAAR and ACTRIS since 2009. Sampling frequency is every 6th day in fraction PM2,5 on 2 quartz-fibre filters. Since October 2011 the sampling on filters has been implementing behind the denuder catching the organic vapor. Amount of OC on back quartz fiber filter represents positive artifact by measurement without denuder and negative artifact by measurements with denuder. The analytical method is thermal-optical analysis. The samples are analyzed in CHMI Central Laboratories in Prague-Libuš using EC-OC Sunset Lab Dual Analyzer. Charring correction is made by laser transmission monitoring. Slightly decreasing tendency of EC-OC was found in the period under review (2009-2014). The mean annual concentration of total carbon (TC) in PM2,5 was 3,73 µg.m-3. The figure for elemental carbon (0,5 µg.m-3) represents the mean annual ratio of 13% on TC. EC-OC concentrations follow an annual course that reflects their emission levels, i.e. with maximums in winter and minimums in summer. The seasonal variation of EC/TC ratio ranges between 9,6 (summer) - 14,2% (winter). Mean TC ratio on PM2,5 total mass in the period under review was 29%, the highest ratios reached 50%. EC participated on PM2,5 total mass by 3,5% in average. 3D trajectories were used for sector analysis of measured EC-OC data (NILU, 2016). The highest concentrations are recorded in situations when air masses reach the territory of the Czech Republic from the north-eastern directions or the local air masses prevailing. The differences between sectors are much larger in the cold period of the year.

  4. Technology Development, Evaluation, and Application (TDEA) FY 1998 Progress Report Environment, Safety, and Health (ESH) Division

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Larry G. Hoffman; Kenneth Alvar; Thomas Buhl

    1999-06-01

    This progress report presents the results of 10 projects funded ($504K) in FY98 by the Technology Development, Evaluation, and Application (TDEA) Committee of the Environment, Safety, and Health Division. Nine projects are new for this year; two projects were completed in their third and final TDEA-funded year. As a result of their TDEA-funded projects, investigators have published 19 papers in professional journals, proceedings, or Los Alamos reports and presented their work at professional meetings. Supplemental funds and in-kind contributions, such as staff time, instrument use, and work space were also provided to the TDEA-funded projects by organizations external to ESHmore » Division. Products generated from the projects funded in FY98 included a new extremity dosimeter that replaced the previously used finger-ring dosimeters, a light and easy-to-use detector to measure energy deposited by neutron interactions, and a device that will allow workers to determine the severity of a hazard.« less

  5. The Camp Hill Project: Objectives and Design

    ERIC Educational Resources Information Center

    Mattingly, John B.

    1976-01-01

    Available from: EC 090 474. Outlined are the problems and objectives of Pennsylvania's Camp Hill Project--a program designed to complete psychological needs assessments for juveniles incarcerated at Camp Hill, to develop project policies and guidelines in preparation for meeting with juvenile court judges, and to hire staff. (SBH)

  6. Funding Mechanisms for Ecosystem Services Projects

    NASA Astrophysics Data System (ADS)

    Russell, V.

    2014-12-01

    Ecosystem services projects ideally should be funded through commoditized markets. Where those markets do not exist financing directly from interested private sector parties can be a direct link between business interested in fulfilling sustainability goals and project implementers. Challenges exist, however in 1) linking those interests; 2) carefully quantifying the services produced, their true costs to implement and meeting protocol standards; 3) measuring the success of projects, especially over lengthy periods of time; and 4) balancing issues related to multiple spatial scales for projects and funding to make a difference. Examples from National Forest Foundation's experience implementing carbon and water projects with multiple private sector funders and the USDA Forest Service will highlight experiences and lessons learned in funding and implementing ecosystem service projects.

  7. The evolution of an academic-community partnership in the design, implementation, and evaluation of experience corps® Baltimore city: a courtship model.

    PubMed

    Tan, Erwin J; McGill, Sylvia; Tanner, Elizabeth K; Carlson, Michelle C; Rebok, George W; Seeman, Teresa E; Fried, Linda P

    2014-04-01

    Experience Corps Baltimore City (EC) is a product of a partnership between the Greater Homewood Community Corporation (GHCC) and the Johns Hopkins Center on Aging and Health (COAH) that began in 1998. EC recruits volunteers aged 55 and older into high-impact mentoring and tutoring roles in public elementary schools that are designed to also benefit the volunteers. We describe the evolution of the GHCC-COAH partnership through the "Courtship Model." We describe how community-based participatory research principals, such as shared governance, were applied at the following stages: (1) partner selection, (2) getting serious, (3) commitment, and (4) leaving a legacy. EC could not have achieved its current level of success without academic-community partnership. In early stages of the "Courtship Model," GHCC and COAH were able to rely on the trust developed between the leadership of the partner organizations. Competing missions from different community and academic funders led to tension in later stages of the "Courtship Model" and necessitated a formal Memorandum of Understanding between the partners as they embarked on a randomized controlled trial. The GHCC-COAH partnership demonstrates how academic-community partnerships can serve as an engine for social innovation. The partnership could serve as a model for other communities seeking multiple funding sources to implement similar public health interventions that are based on national service models. Unified funding mechanisms would assist the formation of academic-community partnerships that could support the design, implementation, and the evaluation of community-based public health interventions.

  8. An homogeneous seismological bulletin for the European-Mediterranean region

    NASA Astrophysics Data System (ADS)

    Bossu, R.; Godey, S.; Mazet-Roux, G.

    2003-12-01

    The Euro-Mediterranean Seismological Center (EMSC) has been working on the production of an homogeneous seismological bulletin for the European- Mediterranean region. Such a catalogue could be useful as a reference for seismic hazard studies in the region. The 3 main objectives are to rapidly (with few months delay) provide a bulletin for events with M>3 occuring in the Euro-Med region (from Iceland in the North-West to the Arabic Peninsula in the South-East) by merging parametric data, to obtain better location accuracy in border regions and to improve data availability. The different tools (data merging, data exchange procedures...) have been developed during a 2-years EC funded project carried out in collaboration with 10 partners including the ISC. The developement period ended with the EC project by the end of 2002. Seismological data from 1998 to 2003 have been gathered from about 60 contributors (mainly national networks) providing data from 1500 stations. Up to now, nearly 5,000,000 arrival times for more than 340 000 events were reported (both values including redundancies). Numerous tests have already been performed to validate the automatic processing of the bulletins. To finalize this test period and start the operational production, we have decided to create a 2 years catalogue for 1998 and 1999 and to carry out a careful comparison of the results with the ISC catalogue. More precisely, the station distribution and data coverage obtained with the EMSC database is presented in parallel with the ones provided by the ISC. A statistical analysis is performed to assess the accuracy of the EMSC relocation. For specific regions (ie. Poland, Italy, North Africa), we present the improvements made using larger dataset than the one provided by national organisations. Finally, we will analyse the performances, point out possible weaknesses and present the necessary improvements before starting the operational production, probably by early 2004.

  9. 40 CFR 1518.3 - Policy.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... projects, including: (1) Leasing office space and providing utilities; (2) Leasing or purchasing equipment... costs for task force employees. (d) In carrying out the purposes of the OEQ Management Fund, the... studies or projects. (e) Task forces and projects funded by the OEQ Management Fund are permitted to make...

  10. 40 CFR 1518.3 - Policy.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... projects, including: (1) Leasing office space and providing utilities; (2) Leasing or purchasing equipment... costs for task force employees. (d) In carrying out the purposes of the OEQ Management Fund, the... studies or projects. (e) Task forces and projects funded by the OEQ Management Fund are permitted to make...

  11. 75 FR 60169 - Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-29

    ... October 29, 2010 to be assured of consideration. Community Development Financial Institutions (CDFI) Fund...: CDFI/CDE Fund Project Profile Web Form. Form: CDFI 0030. Description: The voluntary collection of narrative descriptions of projects financed by CDFI Fund awardees and allocates via the CDFI/CDE Project...

  12. 40 CFR 149.111 - Funding to redesigned projects.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 23 2011-07-01 2011-07-01 false Funding to redesigned projects. 149.111 Section 149.111 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER... Designated Sole Source Aquifer in the San Antonio, Texas Area § 149.111 Funding to redesigned projects. After...

  13. 23 CFR 661.23 - How will a bridge project be programmed for funding once eligibility has been determined?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false How will a bridge project be programmed for funding once... TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.23 How will a bridge project be programmed for funding once eligibility has been determined? (a) All projects will be...

  14. 76 FR 67172 - Riverbank Hydro No. 16 LLC, Lock Hydro Friends Fund IV, FFP Project 55 LLC; Notice of Competing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14167-000, 14185-000 and 14196-000] Riverbank Hydro No. 16 LLC, Lock Hydro Friends Fund IV, FFP Project 55 LLC; Notice of..., Lock Hydro Friends Fund IV (Lock Hydro), and FFP Project 55 LLC (FFP 55) filed preliminary permit...

  15. 76 FR 67169 - Riverbank Hydro No. 10 LLC Lock Hydro Friends Fund XL FFP Project 56 LLC; Notice of Competing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14164-000; 14189-000; 14198-000] Riverbank Hydro No. 10 LLC Lock Hydro Friends Fund XL FFP Project 56 LLC; Notice of Competing... Hydro Friends Fund XL (Lock Hydro), and FFP Project 56 LLC (FFP 56) filed preliminary permit...

  16. 76 FR 67176 - Riverbank Hydro No. 13 LLC, Lock Hydro Friends Fund XXXIV, FFP Project 55 LLC; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14168-000, 14187-000 and 14199-000] Riverbank Hydro No. 13 LLC, Lock Hydro Friends Fund XXXIV, FFP Project 55 LLC; Notice of..., Lock Hydro Friends Fund XXXIV (Lock Hydro), and FFP Project 55 LLC (FFP 55) filed preliminary permit...

  17. 76 FR 67167 - Riverbank Hydro No. 6 LLC, Lock Hydro Friends Fund XLVII, FFP Project 52 LLC; Notice of Competing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14172-000, 14178-000 and 14190-000] Riverbank Hydro No. 6 LLC, Lock Hydro Friends Fund XLVII, FFP Project 52 LLC; Notice of..., Lock Hydro Friends Fund XLVII (Lock Hydro), and FFP Project 52 LLC (FFP 52) filed preliminary permit...

  18. 23 CFR 661.23 - How will a bridge project be programmed for funding once eligibility has been determined?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false How will a bridge project be programmed for funding once... TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.23 How will a bridge project be programmed for funding once eligibility has been determined? (a) All projects will be...

  19. Funding Solar Projects at Federal Agencies: Mechanisms and Selection Criteria (Brochure)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    Implementing solar energy projects at federal facilities is a process. The project planning phase of the process includes determining goals, building a team, determining site feasibility and selecting the appropriate project funding tool. This fact sheet gives practical guidance to assist decision-makers with understanding and selecting the funding tool that would best address their site goals. Because project funding tools are complex, federal agencies should seek project assistance before making final decisions. High capital requirements combined with limits on federal agency energy contracts create challenges for funding solar projects. Solar developers typically require long-term contracts (15-20) years to spread outmore » the initial investment and to enable payments similar to conventional utility bill payments. In the private sector, 20-year contracts have been developed, vetted, and accepted, but the General Services Administration (GSA) contract authority (federal acquisition regulation [FAR] part 41) typically limits contract terms to 10 years. Payments on shorter-term contracts make solar economically unattractive compared with conventional generation. However, in several instances, the federal sector has utilized innovative funding tools that allow long-term contracts or has created a project package that is economically attractive within a shorter contract term.« less

  20. Project description and crowdfunding success: an exploratory study.

    PubMed

    Zhou, Mi Jamie; Lu, Baozhou; Fan, Weiguo Patrick; Wang, G Alan

    2018-01-01

    Existing research on antecedent of funding success mainly focuses on basic project properties such as funding goal, duration, and project category. In this study, we view the process by which project owners raise funds from backers as a persuasion process through project descriptions. Guided by the unimodel theory of persuasion, this study identifies three exemplary antecedents (length, readability, and tone) from the content of project descriptions and two antecedents (past experience and past expertise) from the trustworthy cue of project descriptions. We then investigate their impacts on funding success. Using data collected from Kickstarter, a popular crowdfunding platform, we find that these antecedents are significantly associated with funding success. Empirical results show that the proposed model that incorporated these antecedents can achieve an accuracy of 73 % (70 % in F-measure). The result represents an improvement of roughly 14 percentage points over the baseline model based on informed guessing and 4 percentage points improvement over the mainstream model based on basic project properties (or 44 % improvement of mainstream's performance over informed guessing). The proposed model also has superior true positive and true negative rates. We also investigate the timeliness of project data and find that old project data is gradually becoming less relevant and losing predictive power to newly created projects. Overall, this study provides evidence that antecedents identified from project descriptions have incremental predictive power and can help project owners evaluate and improve the likelihood of funding success.

  1. Radiocarbon Analysis to Calculate New End-Member Values for Biomass Burning Source Samples Specific to the Bay Area

    NASA Astrophysics Data System (ADS)

    Yoon, S.; Kirchstetter, T.; Fairley, D.; Sheesley, R. J.; Tang, X.

    2017-12-01

    Elemental carbon (EC), also known as black carbon or soot, is an important particulate air pollutant that contributes to climate forcing through absorption of solar radiation and to adverse human health impacts through inhalation. Both fossil fuel combustion and biomass burning, via residential firewood burning, agricultural burning, wild fires, and controlled burns, are significant sources of EC. Our ability to successfully control ambient EC concentrations requires understanding the contribution of these different emission sources. Radiocarbon (14C) analysis has been increasingly used as an apportionment tool to distinguish between EC from fossil fuel and biomass combustion sources. However, there are uncertainties associated with this method including: 1) uncertainty associated with the isolation of EC to be used for radiocarbon analysis (e.g., inclusion of organic carbon, blank contamination, recovery of EC, etc.) 2) uncertainty associated with the radiocarbon signature of the end member. The objective of this research project is to utilize laboratory experiments to evaluate some of these uncertainties, particularly for EC sources that significantly impact the San Francisco Bay Area. Source samples of EC only and a mix of EC and organic carbon (OC) were produced for this study to represent known emission sources and to approximate the mixing of EC and OC that would be present in the atmosphere. These samples include a combination of methane flame soot, various wood smoke samples (i.e. cedar, oak, sugar pine, pine at various ages, etc.), meat cooking, and smoldering cellulose smoke. EC fractions were isolated using a Sunset Laboratory's thermal optical transmittance carbon analyzer. For 14C analysis, samples were sent to Woods Hole Oceanographic Institution for isotope analysis using an accelerated mass spectrometry. End member values and uncertainties for the EC isolation utilizing this method will be reported.

  2. National institute for Food and Agriculture: novel and changing funding strategies and mechanisms in response to changes in budgets, legislative authorities and scientific culture

    NASA Astrophysics Data System (ADS)

    Cavallaro, N.; Melnick, R.

    2017-12-01

    Farm Bill legislation establishes different funding mechanisms managed by the National Institute of Food and Agriculture (NIFA), which have changed over the years through reauthorization. Other legislation and executive initiatives, as well as recognition by both funders, funding recipients, private organizations, and non-government organizations have stressed the need for multi-, inter-, and trans-disciplinary research and outreach. This presentation will discuss how changes to NIFA legislative authority as well as changing needs and culture in the government and the scientific research community have led to new mechanisms and strategies for types of funded projects, eligibility for NIFA funding, interagency funding, and iterative changes in direction in research solicitations. For example, limited funding for important topics has prompted a need for interagency collaborations in research funding solicitations and jointly funded projects. New legislative authorities and requirements have led to new modes of collaboration with private industry, NGOs and commodity boards along with international alliances. Unlike most funding agencies, NIFA funds education and extension or outreach projects in addition to research projects. New authorities together with increased recognition of scientific research needed to inform societal challenges has led to new thinking and greater flexibility in funding for long-term research projects and larger regional, multi-institutional and multi-national projects. This, in addition to a shifting culture among researchers and research institutions, has aided in new policies, requirements and initiatives among research institutions and government agencies involving information, data sharing and public access. Examples of new mechanisms and programs and their successes along with their drawbacks will be presented.

  3. [Review and analysis of transplant biological research projects funded by National Natural Science Foundation of China].

    PubMed

    Gong, Weihua; Sun, Ruijuan; Dong, Erdan

    2015-08-01

    To study the funding and achievements in the field of organ transplantation support by the National Natural Science Foundation of China (NSFC). A search of NSFC database was made by using the key word "transplantation" and excluding "bone marrow transplantation" for the projects funded between 1988 and 2013. SCI indexed publications that marked with NSFC project number were collected by searching each grant number in the database of the Web of Science. Six hundreds fifty-five projects were identified and received about 220 million yuan in grant funding. These funded research projects were distributed among 25 provinces and autonomous regions, however, which were mainly in the developed coastal areas; of them, 43 (6.56%) projects were granted in xenotransplantation and 17 projects (2.60%) were funded in the field of traditional Chinese medicine-related organ transplantation; Transplantation on blood vessels, heart, kidney, liver, lung, small intestine, pancreatic, cornea, trachea, skin, etc. were primarily performed in research. Nine hundreds and sixty-one SCI-indexed publications were achieved. Magnitude and intensity of NSFC funding, output of SCI publications have been increasing, suggesting that NSFC positively promotes the development of organ transplantation. Although a great progress of transplantation has been made, basic and translational studies should be vigorously strengthened.

  4. Comparison of Expert-Based and Empirical Evaluation Methodologies in the Case of a CBL Environment: The ''Orestis'' Experience

    ERIC Educational Resources Information Center

    Karoulis, Athanasis; Demetriadis, Stavros; Pombortsis, Andreas

    2006-01-01

    This paper compares several interface evaluation methods applied in the case of a computer based learning (CBL) environment, during a longitudinal study performed in three European countries, Greece, Germany, and Holland, and within the framework of an EC funded Leonardo da Vinci program. The paper firstly considers the particularities of the CBL…

  5. A distinct entorhinal cortex to hippocampal CA1 direct circuit for olfactory associative learning.

    PubMed

    Li, Yiding; Xu, Jiamin; Liu, Yafeng; Zhu, Jia; Liu, Nan; Zeng, Wenbo; Huang, Ning; Rasch, Malte J; Jiang, Haifei; Gu, Xiang; Li, Xiang; Luo, Minhua; Li, Chengyu; Teng, Junlin; Chen, Jianguo; Zeng, Shaoqun; Lin, Longnian; Zhang, Xiaohui

    2017-04-01

    Lateral and medial parts of entorhinal cortex (EC) convey nonspatial 'what' and spatial 'where' information, respectively, into hippocampal CA1, via both the indirect EC layer 2→ hippocampal dentate gyrus→CA3→CA1 and the direct EC layer 3→CA1 paths. However, it remains elusive how the direct path transfers distinct information and contributes to hippocampal learning functions. Here we report that lateral EC projection neurons selectively form direct excitatory synapses onto a subpopulation of morphologically complex, calbindin-expressing pyramidal cells (PCs) in the dorsal CA1 (dCA1), while medial EC neurons uniformly innervate all dCA1 PCs. Optogenetically inactivating the distinct lateral EC-dCA1 connections or the postsynaptic dCA1 calbindin-expressing PC activity slows olfactory associative learning. Moreover, optetrode recordings reveal that dCA1 calbindin-expressing PCs develop more selective spiking responses to odor cues during learning. Thus, our results identify a direct lateral EC→dCA1 circuit that is required for olfactory associative learning.

  6. JPRS Report Environmental Issues

    DTIC Science & Technology

    1990-11-21

    Janeiro O GLOBO 4 NovJ 8 Malaysian Commentary Scores EC Plan To Ban Tropical Hardwood Imports [Kuala Lumpur International 6 Nov] 8 Danish Support...Sought in Defending Malaysian Timber Policies [Kuala Lumpur International 7 NovJ 9 German-Indian Arabian Sea Atmospheric Project Findings Announced...an appeal against Judge Wanderley’s decision, thereby allowing the U.S. submarine to remain in Brazilian waters. Malaysian Commentary Scores EC Plan

  7. Risk management, financial evaluation and funding for wastewater and stormwater reuse projects.

    PubMed

    Furlong, Casey; De Silva, Saman; Gan, Kein; Guthrie, Lachlan; Considine, Robert

    2017-04-15

    This paper has considered risk management, financial evaluation and funding in seven Australian wastewater and stormwater reuse projects. From the investigated case studies it can be seen that responsible parties have generally been well equipped to identify potential risks. In relation to financial evaluation methods some serious discrepancies, such as time periods for analysis, and how stormwater benefits are valued, have been identified. Most of the projects have required external, often National Government, funding to proceed. As National funding is likely to become less common in the future, future reuse projects may need to be funded internally by the water industry. In order to enable this the authors propose that the industry requires (1) a standard project evaluation process, and (2) an infrastructure funders' forum (or committee) with representation from both utilities and regulators, in order to compare and prioritise future reuse projects against each other. Copyright © 2017 Elsevier Ltd. All rights reserved.

  8. 75 FR 51748 - GMUG Resource Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-23

    ... II Project funding within Garfield, Mesa, Delta, Gunnison and Montrose Counties, Colorado. DATES: The... funding/ approval of those projects to utilize Title II funds within Garfield, Mesa, Delta, Gunnison and...

  9. Innovative finance : strategic research project.

    DOT National Transportation Integrated Search

    2013-08-01

    Its time to rethink how we fund transportation infrastructure because most transportation : experts agree: theres a transportation funding and financing crisis looming. : Projected revenues from current sources of transportation funding will am...

  10. Assessment of Mediterranean cyclones in the multi-ensemble EC-Earth

    NASA Astrophysics Data System (ADS)

    Gil, Victoria; Liberato, Margarida L. R.; Trigo, Isabel F.; Trigo, Ricardo M.

    2015-04-01

    The geographical location and characteristics of the Mediterranean basin make this a particularly active region in terms of cyclone forming and re-development (Trigo et al., 2002). The area is affected by moving depressions, most originated over the North Atlantic, which may later be forced by the orography surrounding the Mediterranean Sea and enhanced by the local source of moisture and heat fluxes over the Sea itself. The present work analyses the response of Mediterranean cyclones to climate change by means of 7 ensemble members of EC-EARTH model from CMIP5 (Fifth Coupled Model Intercomparison Project). We restrict the analysis to a relatively small subset (7 members) of the total number of ensemble members available in order to take into account only the members present in the three selected experiments for robust detection of extra-tropical cyclones in the Mediterranean (Trigo, 2006). We have applied the standard procedure by comparing a common 25-year period of the historical (1980-2004), present day simulations, and the future climate simulations (2074-2098) forced by RCP4.5 and RCP8.5 scenarios. The study area corresponds to the window between 10°W-42°E and 27°N-48°N. The analysis is performed with a focus in spatial distribution density and main characteristics of the overall cyclones for winter (DJF) and summer (JJA) seasons. Despite the discrepancies in cyclone numbers when compared with the ERA Interim common period (reducing to only 72% in DJF and 78% in JJA), the ensemble average matches relatively well the main spatial patterns of areas. Results indicate that the ensemble average is characterized by a small decrease in winter (-3%) and a notable increase in summer (+10%) in total number of cyclones and that the individual ensemble members reveal small spread. Such tendency is particularly pronounced under the high RCP8.5 emission scenario being more moderated under the RCP4.5 scenario. Additionally, an assessment of changes in the annual cycle suggests a slight decrease of the spring maximum and a pronounced increase in the summer maximum. The cyclone characteristics obtained from the ensemble members of EC-Earth indicate that summer cyclones will tend to be slower, less intense but will have a faster deepening phase. Part of the summer enhanced activity is in areas dominated by thermal lows. Trigo I.F., G. R. Bigg and T.D. Davies, 2002: Climatology of cyclogenesis mechanisms in the Mediterranean. Mon. Wea. Rev. 130, 549-569. Trigo, I. F., 2006: Climatology and Interannual Variability of Storm-Tracks in the Euro-Atlantic sector: a comparison between ERA-40 and NCEP/NCAR Reanalyses. Clim. Dynam., 26, 127-143. Acknowledgements: This work was partially supported by FEDER (Fundo Europeu de Desenvolvimento Regional) funds through the COMPETE (Programa Operacional Factores de Competitividade) and by national funds through FCT (Fundação para a Ciência e a Tecnologia, Portugal) under project STORMEx FCOMP-01-0124-FEDER- 019524 (PTDC/AAC-CLI/121339/2010).

  11. Trends in National Institutes of Health-Funded Congenital Heart Disease Research from 2005 to 2015

    PubMed Central

    Burns, Kristin M.; Pemberton, Victoria L.; Schramm, Charlene A.; Pearson, Gail D.; Kaltman, Jonathan R.

    2017-01-01

    In an era of ongoing need for research to enable evidence-based care for the expanding population with congenital heart disease (CHD), economic fluctuations have impacted research funding. We characterize trends in NIH-funded CHD research from 2005 to 2015. We searched the NIH RePORTER database from 2005 to 2015 using the terms “congenital heart” and “cardiac morphogenesis”. Projects were characterized by year, institute, mechanism, costs, type and topic, and funding trends were analyzed. From 2005 to 2015, NIH funded 633 CHD research projects with total costs of $991 million. The National Heart, Lung, and Blood Institute funded 83% of CHD projects (528, $857 million). The R01 mechanism was used for 45% of projects (288, $421 million). Projects were 70% basic/early translational research, 27% clinical research, and 3% both. Cardiac developmental biology was the most common topic (52%), followed by technology/therapy development (15%), and diagnosis/management (12%). The total number of CHD projects ranged from 153 to 221 per year (30–58 new projects/year), and costs per year ranged from $58 to $116 million. The number of projects and total costs increased until 2012, but decreased again thereafter. CHD research did not experience as much erosion as overall NIH purchasing power; in constant dollars, CHD research funding levels in 2015 were $12 million higher than those in 2005. The NIH supported a diverse portfolio of CHD projects from 2005 to 2015. Support of CHD research projects trended upward until 2012, but declined thereafter due to fiscal austerity measures. PMID:28349207

  12. New advances in the integrated management of food processing by-products in Europe: sustainable exploitation of fruit and cereal processing by-products with the production of new food products (NAMASTE EU).

    PubMed

    Fava, Fabio; Zanaroli, Giulio; Vannini, Lucia; Guerzoni, Elisabetta; Bordoni, Alessandra; Viaggi, Davide; Robertson, Jim; Waldron, Keith; Bald, Carlos; Esturo, Aintzane; Talens, Clara; Tueros, Itziar; Cebrián, Marta; Sebők, András; Kuti, Tunde; Broeze, Jan; Macias, Marta; Brendle, Hans-Georg

    2013-09-25

    By-products generated every year by the European fruit and cereal processing industry currently exceed several million tons. They are disposed of mainly through landfills and thus are largely unexploited sources of several valuable biobased compounds potentially profitable in the formulation of novel food products. The opportunity to design novel strategies to turn them into added value products and food ingredients via novel and sustainable processes is the main target of recently EC-funded FP7 project NAMASTE-EU. NAMASTE-EU aims at developing new laboratory-scale protocols and processes for the exploitation of citrus processing by-products and wheat bran surpluses via the production of ingredients useful for the formulation of new beverage and food products. Among the main results achieved in the first two years of the project, there are the development and assessment of procedures for the selection, stabilization and the physical/biological treatment of citrus and wheat processing by-products, the obtainment and recovery of some bioactive molecules and ingredients and the development of procedures for assessing the quality of the obtained ingredients and for their exploitation in the preparation of new food products. Copyright © 2013 Elsevier B.V. All rights reserved.

  13. Weak turbulence simulations with the Hermite-Fourier spectral method

    NASA Astrophysics Data System (ADS)

    Vencels, Juris; Delzanno, Gian Luca; Manzini, Gianmarco; Roytershteyn, Vadim; Markidis, Stefano

    2015-11-01

    Recently, a new (transform) method based on a Fourier-Hermite (FH) discretization of the Vlasov-Maxwell equations has been developed. The resulting set of moment equations is discretized implicitly in time with a Crank-Nicolson scheme and solved with a nonlinear Newton-Krylov technique. For periodic boundary conditions, this discretization delivers a scheme that conserves the total mass, momentum and energy of the system exactly. In this work, we apply the FH method to study a problem of Langmuir turbulence, where a low signal-to-noise ratio is important to follow the turbulent cascade and might require a lot of computational resources if studied with PIC. We simulate a weak (low density) electron beam moving in a Maxwellian plasma and subject to an instability that generates Langmuir waves and a weak turbulence field. We also discuss some optimization techniques to optimally select the Hermite basis in terms of its shift and scaling argument, and show that this technique improve the overall accuracy of the method. Finally, we discuss the applicability of the HF method for studying kinetic plasma turbulence. This work was funded by LDRD under the auspices of the NNSA of the U.S. by LANL under contract DE-AC52-06NA25396 and by EC through the EPiGRAM project (grant agreement no. 610598. epigram-project.eu).

  14. Michigan Community Colleges Job Training and Retraining Investment Fund. 1983-84 Investment Fund Projects: Impact Statement.

    ERIC Educational Resources Information Center

    Michigan Community Colleges Economic Development and Job Training Network, Ann Arbor.

    This report assesses the impact on Michigan's 29 community colleges of projects funded in 1983-84 through the Community College Job Training and Retraining Investment Fund, a program for funding the state's community colleges so that they will contribute to the economic rehabilitation and development of Michigan. Part I details the financial…

  15. 45 CFR 2552.113 - What financial obligation does the Corporation incur for non-Corporation funded projects?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... PROGRAM Non-Corporation Funded Foster Grandparent Program Projects § 2552.113 What financial obligation... 45 Public Welfare 4 2010-10-01 2010-10-01 false What financial obligation does the Corporation incur for non-Corporation funded projects? 2552.113 Section 2552.113 Public Welfare Regulations Relating...

  16. 76 FR 73612 - Lock Hydro Friends Fund XVIII; Upper Hydroelectric LLC; FFP Project 95 LLC; Riverbank Hydro No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14261-000; 14268-000; 14277-000; 14281-000] Lock Hydro Friends Fund XVIII; Upper Hydroelectric LLC; FFP Project 95 LLC... Friends Fund XVIII (Lock Hydro), Upper Hydroelectric LLC (Upper Hydro), Riverbank Hydro No. 25 LLC...

  17. 76 FR 1427 - Lock+ Hydro Friends Fund XLVIII; FFP Missouri 15, LLC Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-10

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13809-000; Project No. 13814-000] Lock+ Hydro Friends Fund XLVIII; FFP Missouri 15, LLC Notice Announcing Filing Priority for... order of priority is as follows: 1. Lock+ Hydro Friends Fund XLVIII........ Project No. 13809-000...

  18. 78 FR 72879 - Western Minnesota Municipal Power Agency; Lock+ Hydro Friends Fund III, LLC; Notice Announcing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-04

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14540-000; Project No. 14539-000] Western Minnesota Municipal Power Agency; Lock+ Hydro Friends Fund III, LLC; Notice.... 14540-000 2. Lock+ Hydro Friends Fund III, LLC Project No. 14539-000 Dated: November 26, 2013. Nathaniel...

  19. 76 FR 3626 - Lock+ Hydro Friends Fund XLIX; FFP Missouri 14, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13808-000; Project No. 13813-000] Lock+ Hydro Friends Fund XLIX; FFP Missouri 14, LLC; Notice Announcing Preliminary Permit..., near Augusta, Georgia.\\1\\ The applications were filed by Lock+ Hydro Friends Fund XLIX, for Project No...

  20. 76 FR 65720 - Lock+ Hydro Friends Fund XXXV, Riverbank Hydro No. 4, LLC; Notice Announcing Preliminary Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-24

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14136-000; Project No. 14139-000] Lock+ Hydro Friends Fund XXXV, Riverbank Hydro No. 4, LLC; Notice Announcing Preliminary... County, Wisconsin.\\1\\ The applications were filed by Lock+ Hydro Friends Fund XXXV for Project No. 14136...

  1. 77 FR 10740 - Lock+ Hydro Friends Fund XVIII, Upper Hydroelectric, LLC, FFP Project 95, LLC, Riverbank Hydro No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14261-000, 14268-000, 14277-000, 14281-000] Lock+ Hydro Friends Fund XVIII, Upper Hydroelectric, LLC, FFP Project 95, LLC...-Tombigbee Waterway in Lowndes County, Mississippi. The applications were filed by Lock+ Hydro Friends Fund...

  2. Clean Water State Revolving Fund Infographic

    EPA Pesticide Factsheets

    Infographic of the CWSRF program showing total project funding from 1987 through 2015, number of loans, how the program works, who is eligible for assistance, types of projects funded, and return on federal investment.

  3. Assessment of Contributions to Patient Safety Knowledge by the Agency for Healthcare Research and Quality-Funded Patient Safety Projects

    PubMed Central

    Sorbero, Melony E S; Ricci, Karen A; Lovejoy, Susan; Haviland, Amelia M; Smith, Linda; Bradley, Lily A; Hiatt, Liisa; Farley, Donna O

    2009-01-01

    Objective To characterize the activities of projects funded in Agency for Healthcare Research and Quality (AHRQ)' patient safety portfolio and assess their aggregate potential to contribute to knowledge development. Data Sources Information abstracted from proposals for projects funded in AHRQ' patient safety portfolio, information on safety practices from the AHRQ Evidence Report on Patient Safety Practices, and products produced by the projects. Study Design This represented one part of the process evaluation conducted as part of a longitudinal evaluation based on the Context–Input–Process–Product model. Principal Findings The 234 projects funded through AHRQ' patient safety portfolio examined a wide variety of patient safety issues and extended their work beyond the hospital setting to less studied parts of the health care system. Many of the projects implemented and tested practices for which the patient safety evidence report identified a need for additional evidence. The funded projects also generated a substantial body of new patient safety knowledge through a growing number of journal articles and other products. Conclusions The projects funded in AHRQ' patient safety portfolio have the potential to make substantial contributions to the knowledge base on patient safety. The full value of this new knowledge remains to be confirmed through the synthesis of results. PMID:21456108

  4. Assessment of contributions to patient safety knowledge by the Agency for Healthcare Research and Quality-funded patient safety projects.

    PubMed

    Sorbero, Melony E S; Ricci, Karen A; Lovejoy, Susan; Haviland, Amelia M; Smith, Linda; Bradley, Lily A; Hiatt, Liisa; Farley, Donna O

    2009-04-01

    To characterize the activities of projects funded in Agency for Healthcare Research and Quality (AHRQ)'s patient safety portfolio and assess their aggregate potential to contribute to knowledge development. Information abstracted from proposals for projects funded in AHRQ's patient safety portfolio, information on safety practices from the AHRQ Evidence Report on Patient Safety Practices, and products produced by the projects. This represented one part of the process evaluation conducted as part of a longitudinal evaluation based on the Context–Input–Process–Product model. The 234 projects funded through AHRQ's patient safety portfolio examined a wide variety of patient safety issues and extended their work beyond the hospital setting to less studied parts of the health care system. Many of the projects implemented and tested practices for which the patient safety evidence report identified a need for additional evidence. The funded projects also generated a substantial body of new patient safety knowledge through a growing number of journal articles and other products. The projects funded in AHRQ's patient safety portfolio have the potential to make substantial contributions to the knowledge base on patient safety. The full value of this new knowledge remains to be confirmed through the synthesis of results

  5. A Proposal to Localize Fermi GBM GRBs Through Coordinated Scanning of the GBM Error Circle via Optical Telescopes

    NASA Technical Reports Server (NTRS)

    Ukwatta, T. N.; Linnemann, J. T.; Tollefson, K.; Abeysekara, A. U.; Bhat, P. N.; Sonbas, E.; Gehrels, N.

    2011-01-01

    We investigate the feasibility of implementing a system that will coordinate ground-based optical telescopes to cover the Fermi GBM Error Circle (EC). The aim of the system is to localize GBM detected GRBs and facilitate multi-wavelength follow-up from space and ground. This system will optimize the observing locations in the GBM EC based on individual telescope location, Field of View (FoV) and sensitivity. The proposed system will coordinate GBM EC scanning by professional as well as amateur astronomers around the world. The results of a Monte Carlo simulation to investigate the feasibility of the project are presented.

  6. The Hellenic National Tsunami Warning Centre (HL-NTWC): Recent updates and future developments

    NASA Astrophysics Data System (ADS)

    Melis, Nikolaos S.; Charalampakis, Marinos

    2014-05-01

    The Hellenic NTWC (HL-NTWC) was established officially by Greek Law in September 2010. HL-NTWC is hosted at the National Observatory of Athens, Institute of Geodynamics (NOA-IG), which also operates a 24/7 earthquake monitoring service in Greece and coordinates the newly established Hellenic Unified National Seismic Network. NOA-IG and HL-NTWC Operational Centre is linked to the Civil Protection Operational Centre and serves as the official alerting agency to the General Secretariat for Civil Protection in Greece, regarding earthquake events and tsunami watch. Since August 2012, HL-NTWC acts as Candidate Tsunami Watch Provider (CTWP) under the UNESCO IOC - ICG NEAMTWS tsunami warning system (NEAM: North-Eastern Atlantic, the Mediterranean and connected seas) and offers its services to the NEAMTWS system. HL-NTWC has participated in all Communication Test Exercises (CTE) under NEAMTWS and also it has provided tsunami scenarios for extended system testing exercises such as NEAMWAVE12. Some of the recent developments at HL-NTWC in Greece include: deployment of new tide gauge stations for tsunami watch purposes, computation of tsunami scenarios and extending the database in use, improving alerting response times, earthquake magnitude estimation and testing newly established software modules for tsunami and earthquake alerting (i.e. Early-Est, SeisComP3 etc.) in Greece and the Eastern Mediterranean. Although funding today is limited, an advantage of the participation in important EC funded research projects, i.e. NERIES, NERA, TRANSFER, NEAMTIC and ASTARTE, demonstrates that collaboration of top class Research Institutions that care to produce important and useful results in the research front in Europe, can facilitate towards developing and operating top class Operational Centers, useful for Civil Protection purposes in regions in need. Last, it is demonstrated that HL-NTWC collaboration with important key role Research Centers in the Security and Safety issues (e.g. JRC-IPSC) at the Operational front, can further facilitate and secure everyday operation under a collaborative and experience exchanging manner. This work is funded by project ASTARTE - Assessment, STrategy And Risk Reduction for Tsunamis in Europe. Grant 603839, 7th FP (ENV.2013.6.4-3 ENV.2013.6.4-3)

  7. Studying the hydro-meteorological extremes. The benefits from the European Flash Flood research oriented HYDRATE project.

    NASA Astrophysics Data System (ADS)

    Tsanis, Ioannis K.; Koutroulis, Aristeidis G.; Daliakopoulos, Ioannis N.; Grillakis, Emmanouil G.

    2010-05-01

    The present paper summarizes the advances of flash flood research for the Greek case study, within the frame of HYDRATE EC funded project. As a first step, a collation of homogenous primary data on flash floods occurred in Greece based on various data sources resulted in 21 documented events, enriching the HYDRATE database. Specific major events were selected for further detailed data collation and analysis. A common intensive post event field survey was conducted by various researchers with different skills and experience, in order to document the 18th of September 2007, Western Slovenia flash flood event. The observation strategy and the lessons learned during this campaign were applied successfully for surveying an event in Crete. Two flash flood events occurred in Crete were selected for detailed analysis, the 13th of January 1994 event occurred in Giofiros basin and the 17th of October 2006 event occurred in Almirida basin. Several techniques, like distributed rainfall-runoff modelling, hydraulic modelling, indirect and empirical peak discharge estimation, were applied for the understanding of the dominant flash flood processes and the effect of initial conditions on peak discharge. In a more general framework, the seasonality of the hydrometeorologic characteristics of floods that occurred in Crete during the period 1990-2007 and the atmospheric circulation conditions during the flood events were examined. During the three and a half years research period, many lessons have learnt from a fruitful collaboration among the project partners. HYDRATE project improved the scientific basis of flash flood research and provided research knowledge on flood risk management.

  8. A Goal Programming R&D (Research and Development) Project Funding Model of the U.S. Army Strategic Defense Command Using the Analytic Hierarchy Process.

    DTIC Science & Technology

    1987-09-01

    A187 899 A GOAL PROGRANNIN R&D (RESEARCH AND DEVELOPMENT) 1/2 PROJECT FUNDING MODEL 0 (U) NAVAL POSTGRADUATE SCHOOL MONTEREY CA S M ANDERSON SEP 87...PROGRAMMING R&D PROJECT FUNDING MODEL OF THE U.S. ARMY STRATEGIC DEFENSE COMMAND USING THE ANALYTIC HIERARCHY PROCESS by Steven M. Anderson September 1987...jACCESSION NO TITI E (Influde Securt ClauAIcatsrn) A Goal Programming R&D Project Funding Model of the U.S. Army Strategic Defense Command Using the

  9. Technology Development, Evaluation, and Application (TDEA) FY 2001 Progress Report Environment, Safety, and Health (ESH) Division

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    L.G. Hoffman; K. Alvar; T. Buhl

    2002-05-01

    This progress report presents the results of 11 projects funded ($500K) in FY01 by the Technology Development, Evaluation, and Application (TDEA) Committee of the Environment, Safety, and Health Division (ESH). Five projects fit into the Health Physics discipline, 5 projects are environmental science and one is industrial hygiene/safety. As a result of their TDEA-funded projects, investigators have published sixteen papers in professional journals, proceedings, or Los Alamos reports and presented their work at professional meetings. Supplement funds and in-kind contributions, such as staff time, instrument use, and workspace, were also provided to TDEA-funded projects by organizations external to ESH Divisions.

  10. The Ocean Surface Topography SENTINEL-6/JASON-CS Mission

    NASA Astrophysics Data System (ADS)

    Cullen, R.

    2015-12-01

    The Sentinel-6/Jason-CS mission will consist of 2 spacecraft and will be the latest in a series of ocean surface topography missions that will span nearly three decades. They follow the altimeters on- board TOPEX/Poseidon through to Jason-3 (expected March 2015). Jason-CS will continue to fulfil objectives of the reference series whilst introducing a major enhancement in capability providing the operational and science oceanographic community with the state of the art in terms of platform, measurement instrumentation design thus securing optimal operational and science data return. The programme is a part of the EC Copernicus initiative, whose objective is to support Europe's goals regarding sustainable development and global governance of the environment by providing timely and quality data, information, services and knowledge. The programme brings together: ESA for development, procurement & early orbit activities; EUMETSAT for mission management, ground segment, flight ops, contributing funding of the 1st satellite and participation in funding for the 2nd satellite; NASA for the US payload and launcher procurement in addition to funding US science opportunities; EC for funding the operations and participation in funding (with EUMETSAT) for the 2nd satellite; NOAA are expected to provide US ground stations & operations services; CNES for mission expertise and provision of the POD service. The consortium plan to procure 2 satellites with the 1st planned for launch readiness in the 1st half of 2020 with the 2nd satellite 5 years later. The first major commitment to funding was given by the ESA member states that approved the programme in June 2014 and in addition the European Commission funding is also fully secure. The design is based on a platform derived from CryoSat-2 adjusted to the specific requirements of the higher orbit. The principle payload instrument is a high precision Ku/C band radar altimeter with retrieval of geophysical parameters (surface elevation, wind speed and SWH) from the altimeter data require supporting measurements: a DORIS receiver for POD; The Climate Quality Advanced Microwave Radiometer (AMR-C) provided by JPL for high stability path delay correction. Orbit tracking data are also provided by GPS & LRA. An additional US GPS receiver, GNSS-RO, will be dedicated to radio-occultation.

  11. EMSO: European Multidisciplinary Seafloor Observatory

    NASA Astrophysics Data System (ADS)

    Favali, P.; Partnership, Emso

    2009-04-01

    EMSO, a Research Infrastructure listed within ESFRI (European Strategy Forum on Research Infrastructures) Roadmap), is the European-scale network of multidisciplinary seafloor observatories from the Arctic to the Black Sea with the scientific objective of long-term real-time monitoring of processes related to geosphere/biosphere/hydrosphere interactions. EMSO will enhance our understanding of processes through long time series appropriate to the scale of the phenomena, constituting the new frontier of studying Earth interior, deep-sea biology and chemistry and ocean processes. EMSO will reply also to the need expressed in the frame of GMES (Global Monitoring for Environment and Security) to develop a marine segment integrated in the in situ and satellite global monitoring system. The EMSO development relays upon the synergy between the scientific community and the industry to improve the European competitiveness with respect to countries like USA/Canada, NEPTUNE, VENUS and MARS projects, Taiwan, MACHO project, and Japan, DONET project. In Europe the development of an underwater network is based on previous EU-funded projects since early '90, and presently supported by EU initiatives. The EMSO infrastructure will constitute the extension to the sea of the land-based networks. Examples of data recorded by seafloor observatories will be presented. EMSO is presently at the stage of Preparatory Phase (PP), funded in the EC FP7 Capacities Programme. The project has started in April 2008 and will last 4 years with the participation of 12 Institutions representing 12 countries. EMSO potential will be significantly increased also with the interaction with other Research Infrastructures addressed to Earth Science. 2. IFREMER-Institut Français de Recherche pour l'exploitation de la mer (France, ref. Roland Person); KDM-Konsortium Deutsche Meeresforschung e.V. (Germany, ref. Christoph Waldmann); IMI-Irish Marine Institute (Ireland, ref. Michael Gillooly); UTM-CSIC-Unidad de Tecnologia Marina - Consejo Superior de Investigaciones Cientificas (Spain, ref. Juan Jose Danobeitia); UGOT-Goteborgs Universitet (Sweden, ref. Per Hall); HCMR-Hellenic Centre for Marine Research (Greece, ref. Vasilios Likousis); NOCS-National Oceanography Centre Southampton (United Kingdom, ref. Henry A. Ruhl); UiT-University of Tromsø (Norway, ref. Jürgen Mienert); FCT-Fundação para a Ciência e a Tecnologia (Portugal, ref. Jorge Miguel Alberto de Miranda); ITU-Istanbul Teknik Universitesi (Turkey, ref. Namik Çagatay); NIOZ-Stichting Koninklijk Nederlands Instituut voor Zeeonderzoek (The Netherlands, ref. Tjeerd C.E. van Weering).

  12. Drinking Water State Revolving Fund Infographic

    EPA Pesticide Factsheets

    Infographic of the DWSRF program showing total project funding from 1997 through 2016, number of loans, how the program works, who is eligible for assistance, loan terms; types of projects funded, and return on federal investment.

  13. 7 CFR 4285.46 - Prohibited use of cooperative agreement funds.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Agriculture or Agricultural Experiment Station. (e) Project funds cannot be used to pay for the salary and... Experiment Stations, and other State agencies cannot charge their salaries and travel to project funds, with...

  14. 7 CFR 4285.46 - Prohibited use of cooperative agreement funds.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Agriculture or Agricultural Experiment Station. (e) Project funds cannot be used to pay for the salary and... Experiment Stations, and other State agencies cannot charge their salaries and travel to project funds, with...

  15. 7 CFR 4285.46 - Prohibited use of cooperative agreement funds.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Agriculture or Agricultural Experiment Station. (e) Project funds cannot be used to pay for the salary and... Experiment Stations, and other State agencies cannot charge their salaries and travel to project funds, with...

  16. Feedforward inhibition regulates perirhinal transmission of neocortical inputs to the entorhinal cortex: ultrastructural study in guinea pigs.

    PubMed

    Pinto, Aline; Fuentes, Cesar; Paré, Denis

    2006-04-20

    The rhinal cortices constitute the main route for impulse traffic to and from the hippocampus. Tracing studies have revealed that the perirhinal cortex forms strong reciprocal connections with the neo- and entorhinal cortex (EC). However, physiological investigations indicate that perirhinal transmission of neocortical and EC inputs occurs with a low probability. In search of an explanation for these contradictory findings, we have analyzed synaptic connections in this network by combining injections of the anterograde tracer Phaseolus vulgaris-leucoagglutinin (PHAL) into the neocortex, area 36, or area 35 with gamma-aminobutyric acid (GABA) immunocytochemistry and electron microscopic observations. Within area 36, neocortical axon terminals formed only asymmetric synapses, usually with GABA-negative spines (87%), and less frequently with GABA-immunopositive (GABA+) dendrites (13%). A similar synaptic distribution was observed within area 35 except that asymmetric synapses onto GABA+ dendrites were more frequent (23% of synapses). Examination of the projections from area 36 to area 35 and from both regions to the EC revealed an even higher incidence of asymmetric synapses onto GABA+ dendrites (35 and 32%, respectively) than what was observed in the neocortical projection to areas 36 and 35. Furthermore, some of the neocortical and perirhinal terminals containing PHAL and GABA immunolabeling formed symmetric synapses onto GABA-negative dendrites in their projection sites (neocortex to area 35, 16%; area 36 to 35, 7%; areas 36-35 to EC, 12%). Taken together, these findings suggest that impulse transmission through the rhinal circuit is subjected to strong inhibitory influences, reconciling anatomical and physiological data about this network.

  17. FEEDFORWARD INHIBITION REGULATES PERIRHINAL TRANSMISSION OF NEOCORTICAL INPUTS TO THE ENTORHINAL CORTEX: ULTRASTRUCTURAL STUDY IN GUINEA PIGS

    PubMed Central

    Pinto, Aline; Fuentes, Cesar; Paré, Denis

    2008-01-01

    The rhinal cortices constitute the main route for impulse traffic to and from the hippocampus. Tracing studies have revealed that the perirhinal cortex forms strong reciprocal connections with the neo- and entorhinal cortex (EC). Yet, physiological investigations indicate that perirhinal transmission of neocortical and EC inputs occurs with a low probability. In search of an explanation for these contradictory findings, we have analyzed synaptic connections in this network by combining injections of the anterograde tracer Phaseolus vulgaris-leucoagglutinin (PHAL) into the neocortex, area 36, or area 35 with GABA immunocytochemistry and electron microscopic observations. Within area 36, neocortical axon terminals formed only asymmetric synapses, usually with GABA negative spines (87%), and less frequently with GABA immunopositive (GABA+) dendrites (13%). A similar synaptic distribution was observed within area 35 except that asymmetric synapses onto GABA+ dendrites were more frequent (23% of synapses). Examination of the projections from area 36 to area 35 and from both regions to the EC revealed an even higher incidence of asymmetric synapses onto GABA+ dendrites (35% and 32% respectively) than what was observed in the neocortical projection to areas 36 and 35. Furthermore, a proportion of neocortical and perirhinal terminals containing PHAL and GABA immunolabeling formed symmetric synapses onto GABA negative dendrites in their projection sites (neocortex to area 35, 16%; area 36 to 35, 7%; areas 36–35 to EC, 12%). Taken together, these findings suggest that impulse transmission through the rhinal circuit is subjected to strong inhibitory influences, reconciling anatomical and physiological data about this network. PMID:16506192

  18. Implications of Project-Based Funding of Research on Budgeting and Financial Management in Public Universities

    ERIC Educational Resources Information Center

    Raudla, Ringa; Karo, Erkki; Valdmaa, Kaija; Kattel, Rainer

    2015-01-01

    The main goal of the paper is to explore--both theoretically and empirically--the implications of project-based research funding for budgeting and financial management at public universities. The theoretical contribution of the paper is to provide a synthesized discussion of the possible impacts of project-based funding on university financial…

  19. 45 CFR 2551.113 - What financial obligation does the Corporation incur for non-Corporation funded projects?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Non-Corporation Funded SCP Projects § 2551.113 What financial obligation does the Corporation incur... to a sponsor of a non-Corporation funded project, does not create a financial obligation on the part... 45 Public Welfare 4 2010-10-01 2010-10-01 false What financial obligation does the Corporation...

  20. 45 CFR 2553.83 - What financial obligation does the Corporation incur for non-Corporation funded projects?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... VOLUNTEER PROGRAM Non-Corporation Funded Projects § 2553.83 What financial obligation does the Corporation... NGA to a sponsor of a non-Corporation funded project does not create a financial obligation on the... 45 Public Welfare 4 2010-10-01 2010-10-01 false What financial obligation does the Corporation...

  1. 77 FR 11530 - Riverbank Hydro No. 2, LLC, Lock+ Hydro Friends Fund XXXVI, Qualified Hydro 21, LLC; Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-27

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14130-000, 14137-000, 14134-000] Riverbank Hydro No. 2, LLC, Lock+ Hydro Friends Fund XXXVI, Qualified Hydro 21, LLC; Notice.... 2, LLC for Project No. 14130-000, Lock+ Hydro Friends Fund XXXVI for Project No. 14137-000, and...

  2. 76 FR 73616 - Lock Hydro Friends Fund VIII, FFP Project 92 LLC, Riverbank Hydro No. 24 LLC; Notice of Competing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14262-000; 14276-000; 14280-000] Lock Hydro Friends Fund VIII, FFP Project 92 LLC, Riverbank Hydro No. 24 LLC; Notice of..., and Competing Applications On September 1, 2011, Lock Hydro Friends Fund VIII (Lock Hydro), FFP...

  3. 76 FR 73615 - FFP Project 91 LLC; Riverbank Hydro No. 23 LLC; Lock Hydro Friends Fund III; Notice of Competing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14275-000; 14279-000; 14282-000] FFP Project 91 LLC; Riverbank Hydro No. 23 LLC; Lock Hydro Friends Fund III; Notice of... LLC (Riverbank), and Lock Hydro Friends Fund III (Lock Hydro), filed preliminary permit applications...

  4. 76 FR 4648 - Lock+ Hydro Friends Fund XLIX; FFP Missouri 14, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-26

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13808-000; Project No. 13813-000] Lock+ Hydro Friends Fund XLIX; FFP Missouri 14, LLC; Notice Announcing Filing Priority for... order of priority is as follows: 1. Lock+ Hydro Friends Fund XLIX: Project No. 13808-000. 2. FFP...

  5. 24 CFR 232.254 - Withdrawal of project funds, including for repayments of advances from the borrower, operator, or...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 2 2014-04-01 2014-04-01 false Withdrawal of project funds, including for repayments of advances from the borrower, operator, or management agent. 232.254 Section 232... FACILITIES Contract Rights and Obligations § 232.254 Withdrawal of project funds, including for repayments of...

  6. 24 CFR 232.254 - Withdrawal of project funds, including for repayments of advances from the borrower, operator, or...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 2 2013-04-01 2013-04-01 false Withdrawal of project funds, including for repayments of advances from the borrower, operator, or management agent. 232.254 Section 232... FACILITIES Contract Rights and Obligations § 232.254 Withdrawal of project funds, including for repayments of...

  7. 50 CFR 86.53 - What are funding tiers?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false What are funding tiers? 86.53 Section 86... project merits. (d) We describe the two tiers as follows: (1) Tier One Projects. (i) You may submit a... $100,000 of Federal funds for any given fiscal year. (ii) Tier One projects must meet the eligibility...

  8. 42 CFR 137.342 - What happens to funds remaining at the conclusion of a cost reimbursement construction project?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false What happens to funds remaining at the conclusion of a cost reimbursement construction project? 137.342 Section 137.342 Public Health PUBLIC HEALTH... remaining at the conclusion of a cost reimbursement construction project? All funds, including contingency...

  9. 75 FR 74056 - Request for Public Comment on the Proposed Adoption of Administration for Native Americans (ANA...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-30

    ... to fund medically based activities in projects that address such health issues as diabetes prevention... previously funded projects proposed by the same applicant or activities or projects proposed by a consortium that duplicate activities for which any consortium member also receives funding from ANA.'' This is a...

  10. Naval Postgraduate School Cost Center Financial Management Guide

    DTIC Science & Technology

    1989-12-01

    in several research projects requiring the use of ...and the majority of its Navy research projects . The appropriation symbol for O&M,N funds, found on funding authorization documents and used in O&M,N...School accepts a limited amount of reimbursable funding for projects in support of sponsor requirements and the educational programs at NPS. KNEALE

  11. 45 CFR 2553.72 - What are project funding requirements?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... local funding sources during the first three years of operations; or (2) An economic downturn, the... sources of local funding support; or (3) The unexpected discontinuation of local support from one or more... 45 Public Welfare 4 2010-10-01 2010-10-01 false What are project funding requirements? 2553.72...

  12. 23 CFR 505.15 - Full funding grant agreement.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Full funding grant agreement. 505.15 Section 505.15... MANAGEMENT PROJECTS OF NATIONAL AND REGIONAL SIGNIFICANCE EVALUATION AND RATING § 505.15 Full funding grant... be entered into only after the project has commitments for non-Federal funding in place and all other...

  13. INFOBIOMED: European Network of Excellence on Biomedical Informatics to support individualised healthcare.

    PubMed

    Maojo, Victor; de la Calle, Guillermo; Martín-Sánchez, Fernando; Díaz, Carlos; Sanz, Ferran

    2005-01-01

    INFOBIOMED is an European Network of Excellence (NoE) funded by the Information Society Directorate-General of the European Commission (EC). A consortium of European organizations from ten different countries is involved within the network. Four pilots, all related to linking clinical and genomic information, are being carried out. From an informatics perspective, various challenges, related to data integration and mining, are included.

  14. EC Project 'GUIDELINES ON MPE': proposed qualification and curriculum frameworks and the MPE in nuclear medicine

    NASA Astrophysics Data System (ADS)

    Caruana, C. J.

    2011-09-01

    The objectives of EC project 'Guidelines on Medical Physics Expert' are to provide for improved implementation of the provisions relating to the Medical Physics Expert within Council Directive 97/43/EURATOM and the proposed recast Basic Safety Standards directive. This includes harmonisation of the mission statement for Medical Physics Services as well as the education and training of the MPE. It also includes detailed knowledge-skills-competence inventories for the Medical Physics Expert in each of Diagnostic and Interventional Radiology, Nuclear Medicine and Radiotherapy. This paper presents the proposed Qualification and Curriculum Frameworks and their application to the Medical Physics Expert in Nuclear Medicine.

  15. Contribution of NIH funding to new drug approvals 2010–2016

    PubMed Central

    Beierlein, Jennifer M.; Khanuja, Navleen Surjit; McNamee, Laura M.; Ledley, Fred D.

    2018-01-01

    This work examines the contribution of NIH funding to published research associated with 210 new molecular entities (NMEs) approved by the Food and Drug Administration from 2010–2016. We identified >2 million publications in PubMed related to the 210 NMEs (n = 131,092) or their 151 known biological targets (n = 1,966,281). Of these, >600,000 (29%) were associated with NIH-funded projects in RePORTER. This funding included >200,000 fiscal years of NIH project support (1985–2016) and project costs >$100 billion (2000–2016), representing ∼20% of the NIH budget over this period. NIH funding contributed to every one of the NMEs approved from 2010–2016 and was focused primarily on the drug targets rather than on the NMEs themselves. There were 84 first-in-class products approved in this interval, associated with >$64 billion of NIH-funded projects. The percentage of fiscal years of project funding identified through target searches, but not drug searches, was greater for NMEs discovered through targeted screening than through phenotypic methods (95% versus 82%). For targeted NMEs, funding related to targets preceded funding related to the NMEs, consistent with the expectation that basic research provides validated targets for targeted screening. This analysis, which captures basic research on biological targets as well as applied research on NMEs, suggests that the NIH contribution to research associated with new drug approvals is greater than previously appreciated and highlights the risk of reducing federal funding for basic biomedical research. PMID:29440428

  16. Successful private-public funding of paediatric medicines research: lessons from the EU programme to fund research into off-patent medicines.

    PubMed

    Ruggieri, L; Giannuzzi, V; Baiardi, P; Bonifazi, F; Davies, E H; Giaquinto, C; Bonifazi, D; Felisi, M; Chiron, C; Pressler, R; Rabe, H; Whitaker, M J; Neubert, A; Jacqz-Aigrain, E; Eichler, I; Turner, M A; Ceci, A

    2015-04-01

    The European Paediatric Regulation mandated the European Commission to fund research on off-patent medicines with demonstrated therapeutic interest for children. Responding to this mandate, five FP7 project calls were launched and 20 projects were granted. This paper aims to detail the funded projects and their preliminary results. Publicly available sources have been consulted and a descriptive analysis has been performed. Twenty Research Consortia including 246 partners in 29 European and non-European countries were created (involving 129 universities or public-funded research organisations, 51 private companies with 40 SMEs, 7 patient associations). The funded projects investigate 24 medicines, covering 10 therapeutic areas in all paediatric age groups. In response to the Paediatric Regulation and to apply for a Paediatric Use Marketing Authorisation, 15 Paediatric Investigation Plans have been granted by the EMA-Paediatric Committee, including 71 studies of whom 29 paediatric clinical trials, leading to a total of 7,300 children to be recruited in more than 380 investigational centres. Notwithstanding the EU contribution for each study is lower than similar publicly funded projects, and also considering the complexity of paediatric research, these projects are performing high-quality research and are progressing towards the increase of new paediatric medicines on the market. Private-public partnerships have been effectively implemented, providing a good example for future collaborative actions. Since these projects cover a limited number of off-patent drugs and many unmet therapeutic needs in paediatrics remain, it is crucial foreseeing new similar initiatives in forthcoming European funding programmes.

  17. Modifying the Human-Machine Interface Based on Quantitative Measurements of the Level of Awareness

    NASA Technical Reports Server (NTRS)

    Freund, Louis E.; Knapp, Benjamin

    1999-01-01

    This project got underway without funding approved during the summer of 1998. The initial project steps were to identify previously published work in the fields of error classification systems, physiological measurements of awareness, and related topics. This agenda was modified at the request of NASA Ames in August, 1998 to include supporting the new Cargo Air Association (CAA) evaluation of the Human Factors related to the ADS-B technology. Additional funding was promised to fully support both efforts. Work on library research ended in the late Fall, 1998 when the SJSU project directors were informed that NASA would not be adding to the initial funding of the research project as had been initially committed. However, NASA did provide additional funding for the CAA project activity. NASA elected to leave the research grant in place to provide a pathway for the CAA project funding to SJSU (San Jose State University) to support Dr. Freund's work on the CAA tasks. Dr. Knapp essentially terminated his involvement with the project at this time.

  18. Tracing Impacts of Science and Technology Development

    NASA Astrophysics Data System (ADS)

    Powell, Jeanne

    2003-03-01

    ATP's Mission and Operations. The ATP partners with industry to accelerate the development of innovative technologies for broad national economic benefit. The program's focus is on co-funding collaborative, multi-disciplinary technologies and enabling technology platforms that appear likely to be commercialized, with private sector funding, once the high technical risks are reduced. Industry-led projects are selected for funding in rigorous competitions on the basis of technical and economic merit. Since 1990, ATP has co-funded 642 projects, with 1,329 participants and another 1,300 subcontractors. Measuring to Mission: Overview of ATP's Evaluation Program. ATP's multi-component evaluation strategy provides measures of progress and performance matched to the stage of project evolution; i.e., for the short-term, from the time of project selection and over the course of the R for the mid-term, as commercial applications are pursued, early products reach the market, and dissemination of knowledge created in the R projects occurs; and for the longer-term, as more fully-developed technologies diffuse across multiple products and industries. The approach is applicable to all public S programs and adaptable to private or university projects ranging from basic research to applied industrial R. Examples of Results. ATP's composite performance rating system assesses ATP's completed projects against multi-faceted performance criteria of Knowledge Creation and Dissemination and Commercialization Progress 2-3 years after the end of ATP-funded R. It generates scores ranging from zero to four stars. Results for ATP's first 50 completed projects show that 16are in the bottom group of zero or one stars. 60the middle group. It is understood that not all ATP projects will be successful given the program's emphasis on funding high-risk technology development that the private sector is unwilling and unable to fund alone. Different technologies have different timelines for commercialization and diffusion. ATP has contracted a number of in-depth case studies of individual projects and groups of related projects. Given that the full timeline for economic impact extends many years after ATP funding ends, some studies are prospective, and others are retrospective. Some are a mix of the two. Quantitative economic impacts from just a few or the projects funded to date provide strong evidence that the ATP is addressing its ultimate goal of broad economic benefits to the nation and generating value that vastly exceeds the cost of the program to date.

  19. Creative Partnerships for Funding Nursing Research

    PubMed Central

    McCann, Judith J.; Hills, Elizabeth Blanchard; Zauszniewski, Jaclene A.; Smith, Carol E.; Farran, Carol J.; Wilkie, Diana J.

    2013-01-01

    The Small Business Innovation Research (SBIR) program and the Small Business Technology Transfer Research (STTR) program are two federal funding mechanisms that some nurses in academic positions have used to support research and development of innovative nursing products or services. Both the SBIR and STTR mechanisms are excellent sources of funding for nurse researchers who want to capitalize on relationships with small businesses or obtain seed money to fund high risk projects with potential to attract new venture capital. This paper provides an overview of NIH-funded SBIR and STTR programs and summarizes similarities and differences between the programs. The paper also describes unique features of NIH SBIR and STTR funding mechanisms that differentiate them from other R-series funding mechanisms, reviews evaluation criteria for SBIR and STTR projects, and discusses critical partners and resources for proposal development. Finally, the paper describes characteristics of successful partnerships and provides examples of SBIR/STTR-funded projects. PMID:20719996

  20. Creative partnerships for funding nursing research.

    PubMed

    McCann, Judith J; Hills, Elizabeth Blanchard; Zauszniewski, Jaclene A; Smith, Carol E; Farran, Carol J; Wilkie, Diana J

    2011-02-01

    The Small Business Innovation Research (SBIR) program and the Small Business Technology Transfer Research (STTR) program are two federal funding mechanisms that some nurses in academic positions have used to support research and development of innovative nursing products or services. Both the SBIR and STTR mechanisms are excellent sources of funding for nurse researchers who want to capitalize on relationships with small businesses or obtain seed money to fund high-risk projects with potential to attract new venture capital. This article provides an overview of National Institutes of Health (NIH)-funded SBIR and STTR programs and summarizes similarities and differences between the programs. The article also describes unique features of NIH SBIR and STTR funding mechanisms that differentiate them from other R-series funding mechanisms, reviews evaluation criteria for SBIR and STTR projects, and discusses critical partners and resources for proposal development. Finally, the article describes characteristics of successful partnerships and provides examples of SBIR/STTR-funded projects.

  1. The Evolution of an Academic–Community Partnership in the Design, Implementation, and Evaluation of Experience Corps® Baltimore City: A Courtship Model

    PubMed Central

    Tan, Erwin J.

    2014-01-01

    Purpose: Experience Corps Baltimore City (EC) is a product of a partnership between the Greater Homewood Community Corporation (GHCC) and the Johns Hopkins Center on Aging and Health (COAH) that began in 1998. EC recruits volunteers aged 55 and older into high-impact mentoring and tutoring roles in public elementary schools that are designed to also benefit the volunteers. We describe the evolution of the GHCC–COAH partnership through the “Courtship Model.” Design and Methods: We describe how community-based participatory research principals, such as shared governance, were applied at the following stages: (1) partner selection, (2) getting serious, (3) commitment, and (4) leaving a legacy. Results: EC could not have achieved its current level of success without academic–community partnership. In early stages of the “Courtship Model,” GHCC and COAH were able to rely on the trust developed between the leadership of the partner organizations. Competing missions from different community and academic funders led to tension in later stages of the “Courtship Model” and necessitated a formal Memorandum of Understanding between the partners as they embarked on a randomized controlled trial. Implications: The GHCC–COAH partnership demonstrates how academic–community partnerships can serve as an engine for social innovation. The partnership could serve as a model for other communities seeking multiple funding sources to implement similar public health interventions that are based on national service models. Unified funding mechanisms would assist the formation of academic–community partnerships that could support the design, implementation, and the evaluation of community-based public health interventions. PMID:23887931

  2. 78 FR 53452 - Notice Announcing Filing Priority for Preliminary Permit Applications

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice Announcing Filing Priority for Preliminary Permit Applications Lock+ Hydro Friends Fund XXX, LLC.. Project No. 13625-003 FFP Project 121, LLC.... FFP Project 121, LLC Project No. 14504-000 2. Lock+ Hydro Friends Fund XXX, LLC Project No. 13625-003...

  3. 43 CFR 431.3 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... restore the Project to a former good operating condition. Colorado River Dam Fund or Fund shall mean that... specified in the Project Act, the Adjustment Act, the Colorado River Basin Project Act, and the Hoover Power... electric service pursuant to the Hoover Power Plant Act. Project or Boulder Canyon Project shall mean all...

  4. 43 CFR 431.3 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... restore the Project to a former good operating condition. Colorado River Dam Fund or Fund shall mean that... specified in the Project Act, the Adjustment Act, the Colorado River Basin Project Act, and the Hoover Power... electric service pursuant to the Hoover Power Plant Act. Project or Boulder Canyon Project shall mean all...

  5. 43 CFR 431.3 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... restore the Project to a former good operating condition. Colorado River Dam Fund or Fund shall mean that... specified in the Project Act, the Adjustment Act, the Colorado River Basin Project Act, and the Hoover Power... electric service pursuant to the Hoover Power Plant Act. Project or Boulder Canyon Project shall mean all...

  6. 43 CFR 431.3 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... restore the Project to a former good operating condition. Colorado River Dam Fund or Fund shall mean that... specified in the Project Act, the Adjustment Act, the Colorado River Basin Project Act, and the Hoover Power... electric service pursuant to the Hoover Power Plant Act. Project or Boulder Canyon Project shall mean all...

  7. 43 CFR 431.3 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... restore the Project to a former good operating condition. Colorado River Dam Fund or Fund shall mean that... specified in the Project Act, the Adjustment Act, the Colorado River Basin Project Act, and the Hoover Power... electric service pursuant to the Hoover Power Plant Act. Project or Boulder Canyon Project shall mean all...

  8. 77 FR 10741 - Lock+ Hydro Friends Fund XII, BOST2, LLC, Riverbank Hydro No. 21, LLC, FFP Project 96, LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14260-000, 14264-000, 14267-000, 14273-000] Lock+ Hydro Friends Fund XII, BOST2, LLC, Riverbank Hydro No. 21, LLC, FFP Project... Greene and Hale counties, Alabama. The applications were filed by Lock+ Hydro Friends Fund XII for...

  9. 76 FR 73614 - Lock Hydro Friends Fund XII; BOST2 LLC; Riverbank Hydro No. 21 LLC; FFP Project 96 LLC; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14260-000; 14264-000; 14267-000; 14273-000] Lock Hydro Friends Fund XII; BOST2 LLC; Riverbank Hydro No. 21 LLC; FFP Project 96..., Motions To Intervene, and Competing Applications On September 1, 2011, Lock Hydro Friends Fund XII (Lock...

  10. 34 CFR 222.192 - What local funds may be considered as available for this project?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... § 222.192 What local funds may be considered as available for this project? To determine the amount of... 34 Education 1 2010-07-01 2010-07-01 false What local funds may be considered as available for this project? 222.192 Section 222.192 Education Regulations of the Offices of the Department of...

  11. LABORATORY DIRECTED RESEARCH AND DEVELOPMENT PROGRAM. ANNUAL REPORT TO THE DEPARTMENT OF ENERGY, DECEMBER 1998.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    OGEKA,G.J.

    1998-12-31

    In FY 1998, the BNL LDBD Program funded 20 projects, 4 of which were new starts, at a total cost of $2,563,681. The small number of new starts was a consequence of severe financial problems that developed between FY 1997 and 1998. Emphasis was given to complete funding for approved multi-year proposals. Following is a table which lists all of the FY 1998 funded projects and gives a history of funding for each by year. Several of these projects have already experienced varying degrees of success as indicated in the individual Project Program Summaries which follow. A total of 17more » informal publications (abstracts, presentations, BNL reports and workshop papers) were reported and an additional 13 formal (full length) papers were either published, are in press or being prepared for publication. The investigators on five projects have filed for a patent. Seven of the projects reported that proposals/grants had either been funded or were submitted for funding. In conclusion, a significant measure of success is already attributable to the FY 1998 LDBD Program in the short period of time involved. The Laboratory has experienced a significant scientific gain by these achievements.« less

  12. LABORATORY DIRECTED RESEARCH AND DEVELOPMENT PROGRAM ANNUAL REPORT TO THE DEPARTMENT OF ENERGY FOR FISCAL YEAR 1999. THE DEPARTMENT OF ENERGY, DECEMBER 1999.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    PAUL,P.; FOX,K.J.

    2000-07-01

    In FY 1999, the BNL LDRD Program funded 33 projects, 25 of which were new starts, at a total cost of $4,525,584. A table is presented which lists all of the FY 1999 funded projects and gives a history of funding for each by year. Several of these projects have already experienced varying degrees of success as indicated in the individual Project Program Summaries which are given. A total of 29 informal publications (abstracts, presentations, reports and workshop papers) were reported and an additional 23 formal (full length) papers were either published, are in press or being prepared for publication.more » The investigators on five projects have filed for patents. Seven of the projects reported that proposals/grants had either been funded or were submitted for funding. The complete summary of follow-on activities is as follows: Information Publications--29, Formal Papers--23, Grants/Proposals/Follow-on Funding--7. In conclusion, a significant measure of success is already attributable to the FY 1999 LDRD Program in the short period of time involved. The Laboratory has experienced a significant scientific gain by these achievements.« less

  13. [Continuous funding of National Natural Science Foundation of China has boosted the development of the discipline of ophthalmology over the past 25 years].

    PubMed

    Jia, Ren-bing; Fan, Xian-qun; Xu, Yan-ying; Dong, Er-dan

    2012-02-01

    To analyze the role of National Natural Science Foundation of China (NSFC) on the development of the discipline of Ophthalmology from 1986 to 2010. Data on the total number of projects and funding of NSFC allocated to Ophthalmology, as well as papers published, awards, personnel training, subject construction were collected, and the role of NSFC on other sources of funding was evaluated. From 1986 to 2010, NSFC supported a total of 593 scientific research projects of Ophthalmology, funding a total amount of 152.44 million Yuan, among which were 371 free application projects, 156 Young Scientist Funds, 9 Key Programs, 5 National Science Fund for Distinguished Young Scholars, 3 Major international (regional) joint research programs, 1 Science Fund for Creative Research Group and 48 other projects. Over the past 25 years, the number of NSFC projects received by Ophthalmology has been an overall upward trend in the share in the Department of Life (Health) Sciences. Take the projects (186 of 292, 63.7%) as examples completed between 2002 and 2010, a total 262 papers were published in Science Citation Index (SCI) included journals and 442 papers were published in Chinese journals. Meanwhile, 8 Second prizes of National Science and Technology Progress Award and 1 State Technological Invention Award were received. As of 2010, the training of a total of more than 40 postdoctoral, more than 400 doctoral students and more than 600 graduate students have been completed. 5 national key disciplines and 1 national key laboratory have been built. Moreover, 2 "973" programs from Ministry of Science and Technology and 1 project of special fund in the public interest from Ministry of Public Health were obtained. 2 scholars were among the list of Yangtze Fund Scholars granted by Ministry of Education. Over the past 25 years, a full range of continuous funding from NSFC has led to fruitful results and a strong impetus to the progress of discipline of Ophthalmology.

  14. 78 FR 12304 - Lock+ Hydro Friends Fund XLII, LLC; Notice of Application Ready for Environmental Analysis and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-22

    ... Friends Fund XLII, LLC; Notice of Application Ready for Environmental Analysis and Soliciting Comments...+ Hydro Friends Fund XLII, LLC. e. Name of Project: Braddock Locks and Dam Hydroelectric Project. f...\\ Hydro Friends Fund XLII, LLC, c/o Hydro Green Energy, LLC, 900 Oakmont Lane, Suite 310, Westmont, IL...

  15. Coping with the crisis: people with severe mental disorders acting for social change through sustainable energy.

    PubMed

    Carta, Mg; Sancassiani, F; Lecca, Me; Pintus, E; Pintus, M; Pisano, E; Congiu, S; Moro, Mf; Angermeyer, Cm

    2013-01-01

    The aim of the study was to examine the efficacy of a vocational training program on renewable energy sources in reducing disabilities of people with chronic psychosis (CP). The innovative element was that the project could produce major advantages regarding the economic needs of the whole area involved. Experimental Cohort, 26 subjects with CP (EC); Control Cohort1, 130 subjects with CP following pharmacotherapy plus other rehabilitation activities (CIC); Control Cohort2, 101 subjects with CP following the usual treatment (pharmacotherapy) (CUC). Study tool: Health of the Nation Outcome Scales (HoNOS). Assessment made at the start of the study (T0) and after three months (T1). Statistical analysis made by MANOVA. Improvement in HoNOS total score in both groups (F=7.574, p=0.000) with non-significant differences between groups over time (F=1.336, p=0.252) was found comparing EC vs. CIC. Greater improvement in EC vs. CIC was shown in the HoNOS "impairment" scale (F=4.910, p=0.028). EC vs. CUC: both groups improved in HoNOS total score (F=9.440, p=0.000) but the improvement was greater in EC (F = 2.273, P=0.048). Work inclusion, as well as other rehabilitation treatments, reduces the social needs of people with chronic psychosis. Work inclusion in a project with real relevance for the area where these people live, produces more improvement of cognitive, physical and somatic disabilities, probably related to a better outcome in self-efficacy.

  16. Human platelet lysate is a feasible candidate to replace fetal calf serum as medium supplement for blood vascular and lymphatic endothelial cells.

    PubMed

    Hofbauer, Pablo; Riedl, Sabrina; Witzeneder, Karin; Hildner, Florian; Wolbank, Susanne; Groeger, Marion; Gabriel, Christian; Redl, Heinz; Holnthoner, Wolfgang

    2014-09-01

    As angiogenic and lymphangiogenic key players, endothelial cells (ECs) are promising candidates for vascular regenerative therapies. To culture ECs in vitro, fetal calf serum (FCS) is most often used. However, some critical aspects of FCS usage, such as possible internalization of xenogeneic proteins and prions, must be considered. Therefore, the aim of this project was to determine if human platelet lysate (hPL) is a suitable alternative to FCS as medium supplement for the culture of blood vascular and lymphatic endothelial cells. The usability of hPL was tested by analysis of endothelial surface marker expression, metabolic activity and vasculogenic potential of outgrowth ECs (OECs), human umbilical vein ECs (HUVECs), and lymphatic ECs (LECs). Expression of EC markers CD31, VEGFR2, VE-cadherin and CD146 did not differ significantly between the EC types cultured in FCS or hPL. In addition, OECs, HUVECs and LECs formed tube-like structures on Matrigel when cultured in hPL and FCS. With the use of 3-(4,5-dimethylthiazol-2-yl)-2,5-diphenyltetrazoliumbromid assays, we found that the metabolic activity of OECs and LECs was slightly decreased when hPL was used. However, HUVECs and LECs did not show a significant decrease in metabolic activity, and HUVECs showed a slightly higher activity at low seeding densities. The use of hPL on different EC types did not reveal any substantial negative effects on EC behavior. Thus, hPL appears to be a favorable candidate to replace FCS as a medium supplement in the culture of ECs. Copyright © 2014 International Society for Cellular Therapy. Published by Elsevier Inc. All rights reserved.

  17. Extracolonic Cancer in Inflammatory Bowel Disease: Data from the GETECCU Eneida Registry.

    PubMed

    Chaparro, María; Ramas, M; Benítez, J M; López-García, A; Juan, A; Guardiola, J; Mínguez, M; Calvet, X; Márquez, L; Fernández Salazar, L I; Bujanda, L; García, C; Zabana, Y; Lorente, R; Barrio, J; Hinojosa, E; Iborra, M; Cajal, M Domínguez; Van Domselaar, M; García-Sepulcre, M F; Gomollón, F; Piqueras, M; Alcaín, G; García-Sánchez, V; Panés, J; Domènech, E; García-Esquinas, E; Rodríguez-Artalejo, F; Gisbert, J P

    2017-07-01

    The objective of this study was (a) To know the prevalence and distribution of extracolonic cancer (EC) in patients with inflammatory bowel disease (IBD); (b) To estimate the incidence rate of EC; (c) To evaluate the association between EC and treatment with immunosuppressants and anti-tumor necrosis factor (TNF) agents. This was an observational cohort study. IBD and inclusion in the ENEIDA Project (a prospectively maintained registry) from GETECCU. Patients with EC before the diagnosis of IBD, lack of relevant data for this study, and previous treatment with immunosuppressants other than corticosteroids, thiopurines, methotrexate, or anti-TNF agents. The Kaplan-Meier method was used to evaluate the impact of several variables on the risk of EC, and any differences between survival curves were evaluated using the log-rank test. Stepwise multivariate Cox regression analysis was used to investigate factors potentially associated with the development of EC, including drugs for the treatment of IBD, during follow-up. A total of 11,011 patients met the inclusion criteria and were followed for a median of 98 months. Forty-eight percent of patients (5,303) had been exposed to immunosuppressants or anti-TNF drugs, 45.8% had been exposed to thiopurines, 4.7% to methotrexate, and 21.6% to anti-TNF drugs. The prevalence of EC was 3.6%. In the multivariate analysis, age (HR=1.05, 95% CI=1.04-1.06) and having smoked (hazards ratio (HR)=1.47, 95% confidence interval (CI)=1.10-1.80) were the only variables associated with a higher risk of EC. Neither immunosuppressants nor anti-TNF drugs seem to increase the risk of EC. Older age and smoking were associated with a higher prevalence of EC.

  18. 34 CFR 664.3 - Who is eligible to participate in projects funded under the Fulbright-Hays Group Projects Abroad...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... the Fulbright-Hays Group Projects Abroad Program? 664.3 Section 664.3 Education Regulations of the... EDUCATION FULBRIGHT-HAYS GROUP PROJECTS ABROAD PROGRAM General § 664.3 Who is eligible to participate in projects funded under the Fulbright-Hays Group Projects Abroad Program? An individual is eligible to...

  19. 34 CFR 664.3 - Who is eligible to participate in projects funded under the Fulbright-Hays Group Projects Abroad...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... the Fulbright-Hays Group Projects Abroad Program? 664.3 Section 664.3 Education Regulations of the... EDUCATION FULBRIGHT-HAYS GROUP PROJECTS ABROAD PROGRAM General § 664.3 Who is eligible to participate in projects funded under the Fulbright-Hays Group Projects Abroad Program? An individual is eligible to...

  20. 34 CFR 664.3 - Who is eligible to participate in projects funded under the Fulbright-Hays Group Projects Abroad...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... the Fulbright-Hays Group Projects Abroad Program? 664.3 Section 664.3 Education Regulations of the... EDUCATION FULBRIGHT-HAYS GROUP PROJECTS ABROAD PROGRAM General § 664.3 Who is eligible to participate in projects funded under the Fulbright-Hays Group Projects Abroad Program? An individual is eligible to...

  1. Funding Large Projects in Ohio's Small and Medium Sized Metropolitan Planning Organizations

    DOT National Transportation Integrated Search

    1999-01-01

    This abstract addresses how the state of Ohio assists the smaller MPO areas in : funding larger transportation projects. The amount of funds and corresponding : obligation ceiling available to an individual smaller MPO in a particular : year m...

  2. 23 CFR 661.43 - Can other sources of funds be used to finance a queued project in advance of receipt of IRRBP funds?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Can other sources of funds be used to finance a queued project in advance of receipt of IRRBP funds? 661.43 Section 661.43 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.43 Can other sources of funds be...

  3. Description of the docking module ECS for the Apollo-Soyuz Test Project.

    NASA Technical Reports Server (NTRS)

    Guy, W. W.; Jaax, J. R.

    1973-01-01

    The role of the Docking Module ECS (Environmental Control System) to be used on the Apollo-Soyuz Test mission is to provide a means for crewmen to transfer safely between the Apollo and Soyuz vehicles in a shirtsleeve environment. This paper describes the Docking Module ECS and includes the philosophy and rationale used in evaluating and selecting the capabilities that are required to satisfy the Docking Module's airlock function: (1) adjusting the pressure and composition of the atmosphere to effect crew transfer and (2) providing a shirtsleeve environment during transfer operations. An analytical evaluation is given of the environmental parameters (including CO2 level, humidity, and temperature) during a normal transfer timeline.

  4. European Union investment and countries' involvement in mental health research between 2007 and 2013.

    PubMed

    Hazo, J-B; Gervaix, J; Gandré, C; Brunn, M; Leboyer, M; Chevreul, K

    2016-08-01

    This study aimed to estimate the commitment to mental health research by the European Union (EU) through the 7th framework (FP7) and the competitiveness and innovation (CIP) programmes during the 2007-2013 period. Research projects dedicated or partially related to mental health were identified using keywords in the CORDIS database that inventories all FP7 and CIP research projects. We then contacted projects' principal investigators to access the budget breakdown by country and performed an imputation of the distribution of funding between countries based on projects' and participants' characteristics where information was missing. Among the 25 783 research projects funded by the FP7 and the CIP, 215 (0.8%) were specifically dedicated to mental health and 170 (0.7%) were partially related to mental health. They received €607.1 million representing 1.4% of FP7 total funding. Within the FP7-Health subprogramme, the projects represented 5.2% of funding. Important variations appeared across EU countries both for raw funding, which varied between €0 and €77M, and for funding per 100 inhabitants, which varied between €0 and €293. EU funding of mental health research does not match the burden incurred by mental disorders and must be increased in the next framework programme. © 2016 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.

  5. [Analysis of ophthalmic projects granted by National Natural Science Foundation].

    PubMed

    Shao, Jing-Jing; Mo, Xiao-Fen; Pan, Zhi-Qiang; Gan, De-Kang; Xu, Yan-Ying

    2008-09-01

    To understand the status of basic research work in the field of ophthalmology by analyzing the projects funded by the National Natural Science Foundation of China (NSFC) from the year of 1986 to 2007, and offer as a reference to the ophthalmologists and researchers. NSFC supported ophthalmology projects in the 22 year's period were collected from the database of NSFC. The field of funded projects, the research team and their achievements were analyzed. There were 228 applicants from 47 home institutions were funded in the field of ophthalmology during the past 22 years, 323 projects funded with 66.74 million Yuan in total, in which 165 projects were fulfilled before the end of 2006. The applied and funded projects mainly focus on six different kinds of research area related to retinal diseases, corneal diseases, glaucoma, optic nerve diseases, myopia and cataract, and 70% of them were basic research in nature. As a brief achievement of 165 fulfilled projects, more than 610 papers were published in domestic journals, over 140 papers were published in Science Citation Index journals, more than 600 people were trained, and over 20 scientific awards were obtained. The number of funded projects and achievement of fulfilled projects in the discipline of ophthalmology gradually increased over the past two decades, the research fields were concentrated in certain diseases. NSFC has played an important role in promoting the development of ophthalmology research and bringing up specialists in China. However, clinical research, continuously research, transforming from basic research to clinic applications and multidisciplinary cross studies should be strengthened.

  6. 77 FR 13683 - Notice To Rescind a Notice of Intent To Prepare an Environmental Impact Statement: Highway US-30...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-07

    ...\\ cent of the sales tax revenue for road construction projects for the next 20 years, beginning in 2013... Department of Roads to fund the project entirely with newly acquired state funds. NDOR plans to have the...) and determined that funding for construction of the project was not likely to be available for the...

  7. 76 FR 9541 - Saguache County Resource Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-18

    ... Committee Act. The purpose is to review and recommend project proposals to be funded with Title II money... projects; (2) Review, evaluate and recommend project proposals to be funded with Title II money; (3) Create...

  8. Funding Energy Efficiency and Conservation Projects with the Clean Water State Revolving Fund

    EPA Pesticide Factsheets

    This fact sheet demonstrates how the CWSRF provides assistance to eligible recipients for projects promoting energy efficiency and conservation. It highlights successful projects in New York, Alabama and Maryland.

  9. Learn about the Clean Water State Revolving Fund (CWSRF)

    EPA Pesticide Factsheets

    The Clean Water State Revolving Fund provides financial assistance for a range of water infrastructure projects. Learn how it works, project eligibility, and types of financial assistance it can provide for water quality projects.

  10. Recent trends in oropharyngeal cancer funding and public interest.

    PubMed

    Blasco, Michael A; Svider, Peter F; Tenbrunsel, Troy; Vellaichamy, Gautham; Yoo, George H; Fribley, Andrew M; Raza, S Naweed

    2017-06-01

    The incidence of oropharyngeal cancer (OPC) has increased in the United States. This has been driven by an increase in human papillomavirus (HPV)-positive OPC. Our objective is to determine trends in National Institutes (NIH)-supported research funding and public interest in OPC. The NIH Research Portfolio Online Reporting Tools database was evaluated for projects related to OPC between 2004 and 2015. Projects were evaluated for total funding, relation to HPV, principal investigator departmental affiliation and degree, and NIH agency or center responsible for grant. The Google Trends database was evaluated for relative Internet search popularity of oropharyngeal cancer and related search terms between 2004 and 2015. In terms of NIH funding, 100 OPC-related projects representing 242 grant years and $108.5 million were funded between 2004 and 2015. Total NIH funding for OPC projects increased from $167,406 in 2004 to $16.2 million in 2015. Funding for HPV-related OPC increased from less than $2 million yearly between 2004 and 2010 up to $12.7 million in 2015. Principal investigators related to radiation oncology ($41.8 million) and with doctor of medicine degrees ($52.8 million) received the largest share of total funding. Relative Internet search popularity for oropharyngeal cancer has increased from 2004 to 2015 compared to control cancer search terms. Increased public interest and NIH funding has paralleled the rising incidence of OPC. NIH funding has been driven by projects related to the role of HPV in OPC. 2c. Laryngoscope, 127:1345-1350, 2017. © 2017 The American Laryngological, Rhinological and Otological Society, Inc.

  11. Contribution of NIH funding to new drug approvals 2010-2016.

    PubMed

    Galkina Cleary, Ekaterina; Beierlein, Jennifer M; Khanuja, Navleen Surjit; McNamee, Laura M; Ledley, Fred D

    2018-03-06

    This work examines the contribution of NIH funding to published research associated with 210 new molecular entities (NMEs) approved by the Food and Drug Administration from 2010-2016. We identified >2 million publications in PubMed related to the 210 NMEs ( n = 131,092) or their 151 known biological targets ( n = 1,966,281). Of these, >600,000 (29%) were associated with NIH-funded projects in RePORTER. This funding included >200,000 fiscal years of NIH project support (1985-2016) and project costs >$100 billion (2000-2016), representing ∼20% of the NIH budget over this period. NIH funding contributed to every one of the NMEs approved from 2010-2016 and was focused primarily on the drug targets rather than on the NMEs themselves. There were 84 first-in-class products approved in this interval, associated with >$64 billion of NIH-funded projects. The percentage of fiscal years of project funding identified through target searches, but not drug searches, was greater for NMEs discovered through targeted screening than through phenotypic methods (95% versus 82%). For targeted NMEs, funding related to targets preceded funding related to the NMEs, consistent with the expectation that basic research provides validated targets for targeted screening. This analysis, which captures basic research on biological targets as well as applied research on NMEs, suggests that the NIH contribution to research associated with new drug approvals is greater than previously appreciated and highlights the risk of reducing federal funding for basic biomedical research. Copyright © 2018 the Author(s). Published by PNAS.

  12. 77 FR 13317 - Notice Announcing Filing Priority for Preliminary Permit Applications: Lock+ Hydro Friends Fund...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-06

    ... Applications: Lock+ Hydro Friends Fund VIII; FFP Project 92, LLC; Riverbank Hydro No. 24, LLC On February 28.... 14276-000. 2. Riverbank Hydro No. 24, LLC: Project No. 14280-000. 3. Lock+ Hydro Friends Fund VIII...

  13. Using Mini-Grants as a Resource to Enrich Gifted Programs.

    ERIC Educational Resources Information Center

    Adderholdt-Elliott, Miriam; And Others

    1990-01-01

    Guidelines are offered for accessing local grant and foundation monies to fund special and innovative activities in gifted education programs. Descriptions of six projects funded by grants from local foundations demonstrate the variety of projects that can be funded. (JDD)

  14. Structural equation model for the evaluation of national funding on R&D project of SMEs in consideration with MBNQA criteria.

    PubMed

    Sohn, S Y; Gyu Joo, Yong; Kyu Han, Hong

    2007-02-01

    Financial support on the R&D in Science & Technology for SMEs at the governmental level plays a crucial role on the improvement of the national competitiveness. Korea Science & Engineering Foundation (KOSEF) has supported the R&D projects of SMEs with the competitive technology ability by way of the Science and Technology Promotion Fund. In this paper, we propose a structural equation model (SEM) to evaluate the performance of such a funding program in terms of three aspects: output, outcome and impact under given funding inputs, R&D environment of a recipient company, and external evaluation programs of funding organization. We adopt Malcolm Baldrige National Quality Award (MBNQA) criteria to assess the R&D environmental factors of recipient companies. In addition, we test the effect of interim evaluation of the funded project. The proposed model is applied to the real case and is used to identify the best practices as well as to provide feedback information for the improvement of the government funding programs of the R&D projects of SMEs.

  15. Research for Improved Health: Variability and Impact of Structural Characteristics in Federally Funded Community Engaged Research

    PubMed Central

    Pearson, Cythina R.; Duran, Bonnie; Oetzel, John; Margarati, Maya; Villegas, Malia; Lucero, Julie; Wallerstein, Nina

    2016-01-01

    Background Although there is strong scientific, policy, and community support for community-engaged research (CEnR)—including community-based participatory research (CBPR)—the science of CEnR is still developing. Objective To describe structural differences in federally funded CEnR projects by type of research (i.e., descriptive, intervention, or dissemination/policy change) and race/ethnicity of the population served. Methods We identified 333 federally funded projects in 2009 that potentially involved CEnR, 294 principal investigators/project directors (PI/PD) were eligible to participate in a key informant (KI) survey from late 2011 to early 2012 that asked about partnership structure (68% response rate). Results The National Institute on Minority Health & Health Disparities (19.1%), National Cancer Institute (NCI; 13.3%), and the Centers for Disease Control and Prevention (CDC; 12.6%) funded the most CEnR projects. Most were intervention projects (66.0%). Projects serving American Indian or Alaskan Native (AIAN) populations (compared with other community of color or multiple-race/unspecified) were likely to be descriptive projects (p < .01), receive less funding (p < .05), and have higher rates of written partnership agreements (p < .05), research integrity training (p < .05), approval of publications (p < .01), and data ownership (p < .01). AIAN-serving projects also reported similar rates of research productivity and greater levels of resource sharing compared with those serving multiple-race/unspecified groups. Conclusions There is clear variability in the structure of CEnR projects with future research needed to determine the impact of this variability on partnering processes and outcomes. In addition, projects in AIAN communities receive lower levels of funding yet still have comparable research productivity to those projects in other racial/ethnic communities. PMID:25981421

  16. 76 FR 6612 - Lock+ Hydro Friends Fund XL; FFP Missouri 4, LLC; Allegheny 4 Hydro, LLC; Three Rivers Hydro, LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-07

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13746-000; Project No. 13750-000; Project No. 13776-000; Project No. 13782-000] Lock+ Hydro Friends Fund XL; FFP Missouri 4..., LLC--Project No. 13750-000 3. Allegheny 4 Hydro, LLC--Project No. 13776-000 4. Lock+ Hydro Friends...

  17. 15 CFR 292.4 - Information infrastructure projects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... authority of the governing or managing organization to conduct the proposed activities; qualifications of... each solicitation for unique projects. (b) Project objective. The purpose of these projects is to... funding in connection with that award. Renewal of an award to increase funding or extend the period of...

  18. NIH and USDA Funding of Dietary Supplement Research, 1999–20071

    PubMed Central

    Regan, Karen S.; Wambogo, Edwina A.; Haggans, Carol J.

    2011-01-01

    Over one-half of U.S. adults use dietary supplements, so federally supported research into the safety and effectiveness of these compounds is important for the health of many Americans. Data collected in the Computer Access to Research on Dietary Supplements database, which compiles federally sponsored dietary supplement-related research, are useful to scientists in determining the type of dietary supplement research that federal agencies are currently funding and where research gaps exist. This article describes the dietary supplement-related research funded by the NIH and the USDA. Between fiscal years 1999 and 2007, the number of research projects and funding for dietary supplement research more than doubled. During that period, NIH funded 6748 dietary supplement-related projects at a cost of $1.9 billion and the USDA funded 2258 projects at a cost of $347 million. The top funded dietary supplement ingredient categories were vitamins and minerals, botanicals, phytochemicals, and fatty acids. Cancer was by far the most frequent health outcome in dietary supplement research funding, nearly double the next closest health outcome category. Other health outcomes with the greatest funding were cellular and molecular mechanisms, cardiovascular health, women’s reproductive health, and immune function. The greatest number of dietary supplement research projects are funded by the NIH National Cancer Institute, the NIH National Center for Complementary and Alternative Medicine, the NIH Office of Dietary Supplements, and the USDA Agricultural Research Service. PMID:21106929

  19. Funding Water Reuse and Conservation Projects with the Clean Water State Revolving Fund

    EPA Pesticide Factsheets

    This fact sheet demonstrates how the CWSRF provides assistance to eligible recipients for projects promoting water reuse and conservation. It highlights successful projects for these communities in California, Virginia and Texas.

  20. Water Resources Research Grant Program project descriptions, fiscal year 1986

    USGS Publications Warehouse

    ,

    1986-01-01

    Information is presented on the 43 projects funded by the United States Geological Survey 's Water Resources Grant Program in fiscal year 1986. The report gives the grant number; project title; performing organization; principal investigator(s); dates; and a project description which includes (1) identification of the water related problems and problem-solution approach, (2) contribution to problem solution, (3) objectives, (4) approach, and (5) result users. The 43 projects include 14 in the area of groundwater management, 6 in surface-water management, 2 in systems-operating/planning, 3 in irrigation management, 8 in desalination/reuse, 6 in economic/institutional studies, and 4 in climate variability. The reports contain tables showing (1) funding according to research topic, (2) projects funded to type of submitting organization, (3) proposals received, research topic, and funding levels, and (4) submitting organization. A comparison is given to fiscal year 1985 in each case. (USGS)

  1. A guide to transportation funding options : phase 2, final report, October 2009.

    DOT National Transportation Integrated Search

    2009-10-01

    This project is a continuation of a project that provided a one-stop shop website, A Guide to Transportation Funding : Options (http://utcm.tamu.edu/tfo), detailing transportation funding options and their applicability in an easy-to-use : format. Th...

  2. Escherichia coli O157:H7--Discerning Facts from Fiction: An Integrated Research and Extension Project for Multiple Audiences.

    PubMed

    Moore, D A; Smith, D R; Sischo, W M; Heaton, K; Besser, T E

    2016-02-01

    The O157:H7 (EcO157) epidemiology of Shiga-toxin-producing Escherichia coli (STEC) in cattle is complex, and myths about pre-harvest control are perpetuated. The objectives of this project were to identify perpetuated misinformation and inform four audiences about evidence-based risks and pre-harvest control of EcO157 by addressing: (i) EcO157 epidemiology and pre-harvest control; (ii) how food safety policy is created; and (iii) how to present accurate information about EcO157. An environmental scan using a daily Internet search helped identify themes for education. A literature review of pre-harvest control measures contributed to the development of educational materials (fact sheets, website, web presentations and conferences). Conference 1 was a webinar with 315 registrants, 10 countries including 41 US states and four Canadian provinces. Most participants felt confident in using their new knowledge, more than half felt confident enough to answer EcO157 questions from the public and many would recommend the recorded version of the webinar to colleagues. Conference 2 was live in the Washington, DC, area with most participants employed by the US government. All agreed that they better understood pre-harvest control, how food safety policy was made, and were confident they could create an effective message about STEC pre-harvest control. Videos were posted and received 348 Internet visitors within 2 months. Conference 3 was a webinar with a live audience and Twitter feeds, targeting people who give nutrition advice. Almost all ranked the programme good to excellent and relevant to their work. About 25% indicated that they would share: 'grass-fed beef is not safer than grain-fed', 25% would share information on effectiveness of cattle vaccines, and 14% would share information on message mapping. Across all conferences, major changes in knowledge included the following: there is no additional risk of EcO157 shedding from grain-fed versus grass-fed cattle, pre-harvest vaccination is efficacious, and production systems (pasture versus confinement) do not affect EcO157 shedding rates. © 2015 Blackwell Verlag GmbH.

  3. What happened when Scottish women were given advance supplies of emergency contraception? A survey and qualitative study of women's views and experiences.

    PubMed

    Ziebland, Sue; Wyke, Sally; Seaman, Pete; Fairhurst, Karen; Walker, Jeremy; Glasier, Anna

    2005-04-01

    The Lothian Emergency Contraception Project in Scotland was a radical intervention in which women aged 16-29 were given 5 packs of emergency contraception (EC) to keep at home. We use survey and qualitative interview data to describe how women used the project packs and their views of advance supplies. The women's accounts suggest that concerns that eased access to emergency contraception will lead to repeated use and risky sex appear to be largely unfounded. Women were pleased to be offered the packs, which were reported as having practical advantages and also sparing them the difficulty of negotiating a sometimes awkward consultation. Respondents explained how they used their packs of EC and in their accounts used justifications, repetition and distancing to emphasise that they would not take risks with contraception or sexually transmitted infections. We interpret the data in the light of the observation that EC has an anomalous role in contraception and the work of applied linguists Candlin and Lucas who have demonstrated the difficulties inherent in the family planning consultation.

  4. Adjacency and Proximity Searching in the Science Citation Index and Google

    DTIC Science & Technology

    2005-01-01

    major database search engines , including commercial S&T database search engines (e.g., Science Citation Index (SCI), Engineering Compendex (EC...PubMed, OVID), Federal agency award database search engines (e.g., NSF, NIH, DOE, EPA, as accessed in Federal R&D Project Summaries), Web search Engines (e.g...searching. Some database search engines allow strict constrained co- occurrence searching as a user option (e.g., OVID, EC), while others do not (e.g., SCI

  5. Electron crystallography reveals that substrate release from the PTS IIC glucose transporter is coupled to a subtle conformational change.

    PubMed

    Kalbermatter, David; Chiu, Po-Lin; Jeckelmann, Jean-Marc; Ucurum, Zöhre; Walz, Thomas; Fotiadis, Dimitrios

    2017-07-01

    The phosphoenolpyruvate-dependent sugar phosphotransferase system (PTS) is a structurally and functionally complex system that mediates sugar uptake in bacteria. Besides several soluble subunits, the glucose-specific PTS includes the integral membrane protein IICB that couples the transmembrane transport of glucose to its phosphorylation. Here, we used electron crystallography of sugar-embedded tubular crystals of the glucose-specific IIC transport domain from Escherichia coli (ecIIC glc ) to visualize the structure of the transporter in the presence and absence of its substrate. Using an in vivo transport assay and binding competition experiments, we first established that, while it transports d-glucose, ecIIC glc does not bind l-glucose. We then determined the projection structure of ecIIC glc from tubular crystals embedded in d- and l-glucose and found a subtle conformational change. From comparison of the ecIIC glc projection maps with crystal structures of other IIC transporters, we can deduce that the transporter adopts an inward-facing conformation, and that the maps in the presence and absence of the substrate reflect the transporter before and after release of the transported glucose into the cytoplasm. The transition associated with substrate release appears to require a subtle structural rearrangement in the region that includes hairpin 1. Copyright © 2017 Elsevier Inc. All rights reserved.

  6. Inhibition of projections from the basolateral amygdala to the entorhinal cortex disrupts the acquisition of contextual fear

    PubMed Central

    Sparta, Dennis R.; Smithuis, Jim; Stamatakis, Alice M.; Jennings, Joshua H.; Kantak, Pranish A.; Ung, Randall L.; Stuber, Garret D.

    2014-01-01

    The development of excessive fear and/or stress responses to environmental cues such as contexts associated with a traumatic event is a hallmark of post-traumatic stress disorder (PTSD). The basolateral amygdala (BLA) has been implicated as a key structure mediating contextual fear conditioning. In addition, the hippocampus has an integral role in the encoding and processing of contexts associated with strong, salient stimuli such as fear. Given that both the BLA and hippocampus play an important role in the regulation of contextual fear conditioning, examining the functional connectivity between these two structures may elucidate a role for this pathway in the development of PTSD. Here, we used optogenetic strategies to demonstrate that the BLA sends a strong glutamatergic projection to the hippocampal formation through the entorhinal cortex (EC). Next, we photoinhibited glutamatergic fibers from the BLA terminating in the EC during the acquisition or expression of contextual fear conditioning. In mice that received optical inhibition of the BLA-to-EC pathway during the acquisition session, we observed a significant decrease in freezing behavior in a context re-exposure session. In contrast, we observed no differences in freezing behavior in mice that were only photoinhibited during the context re-exposure session. These data demonstrate an important role for the BLA-to-EC glutamatergic pathway in the acquisition of contextual fear conditioning. PMID:24834031

  7. 76 FR 6612 - Lock Hydro Friends Fund XLIII; FFP Missouri 14, LLC; Solia 4 Hydroelectric, LLC; Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-07

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13745-000; Project No. 13758-000; Project No. 13767-000] Lock Hydro Friends Fund XLIII; FFP Missouri 14, LLC; Solia 4... Hydroelectric, LLC--Project No. 13767-000 2. FFP Missouri 14, LLC--Project No. 13758-000 3. Lock Hydro Friends...

  8. Evaluation of a funded FY00 ITS integration component of the ITS deployment program "Traveler Information Integration Project" within the East Bay SMART Corridors project

    DOT National Transportation Integrated Search

    2004-12-07

    The project originally was granted funding from the earmark in an application dated June 1, 2000. A revised application received approval on May 19, 2003 to reflect a different proposed implementation of the project, while still achieving the project...

  9. 34 CFR 380.5 - What activities may the Secretary fund under community-based supported employment projects?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... the Secretary fund under community-based supported employment projects? (a) Authorized activities. The following activities are authorized under community-based projects: (1) Job search assistance. (2) Job... Community-Based Supported Employment projects for the provision of extended supported employment services...

  10. 40 CFR 93.128 - Traffic signal synchronization projects.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 20 2014-07-01 2013-07-01 true Traffic signal synchronization projects..., Funded or Approved Under Title 23 U.S.C. or the Federal Transit Laws § 93.128 Traffic signal synchronization projects. Traffic signal synchronization projects may be approved, funded, and implemented without...

  11. 14 CFR 158.24 - Notice and opportunity for public comment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... TRANSPORTATION (CONTINUED) AIRPORTS PASSENGER FACILITY CHARGES (PFC'S) Application and Approval § 158.24 Notice... project(s) the public agency is considering for funding by PFC's; (ii) A brief justification for each project the public agency is considering for funding by PFC's; (iii) The PFC level for each project; (iv...

  12. 14 CFR 158.24 - Notice and opportunity for public comment.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... TRANSPORTATION (CONTINUED) AIRPORTS PASSENGER FACILITY CHARGES (PFC'S) Application and Approval § 158.24 Notice... project(s) the public agency is considering for funding by PFC's; (ii) A brief justification for each project the public agency is considering for funding by PFC's; (iii) The PFC level for each project; (iv...

  13. 14 CFR 158.24 - Notice and opportunity for public comment.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... TRANSPORTATION (CONTINUED) AIRPORTS PASSENGER FACILITY CHARGES (PFC'S) Application and Approval § 158.24 Notice... project(s) the public agency is considering for funding by PFC's; (ii) A brief justification for each project the public agency is considering for funding by PFC's; (iii) The PFC level for each project; (iv...

  14. 14 CFR 158.24 - Notice and opportunity for public comment.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... TRANSPORTATION (CONTINUED) AIRPORTS PASSENGER FACILITY CHARGES (PFC'S) Application and Approval § 158.24 Notice... project(s) the public agency is considering for funding by PFC's; (ii) A brief justification for each project the public agency is considering for funding by PFC's; (iii) The PFC level for each project; (iv...

  15. 14 CFR 158.24 - Notice and opportunity for public comment.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... TRANSPORTATION (CONTINUED) AIRPORTS PASSENGER FACILITY CHARGES (PFC'S) Application and Approval § 158.24 Notice... project(s) the public agency is considering for funding by PFC's; (ii) A brief justification for each project the public agency is considering for funding by PFC's; (iii) The PFC level for each project; (iv...

  16. 75 FR 30391 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-01

    ... Time on Tuesday, June 8, 2010. Docket Numbers: EC10-72-000. Applicants: Cloud County Wind Farm, LLC, Pioneer Prairie Wind Farm I, LLC, Arlington Wind Power Project LLC. Description: Application for... Power Project LLC, Cloud County Wind Farm, LLC, and Pioneer Prairie Wind Farm I, LLC. Filed Date: 05/20...

  17. Explore-create-share study: An evaluation of teachers as curriculum innovators in engineering education

    NASA Astrophysics Data System (ADS)

    Berry, Ayora

    The purpose of this study was to investigate the effects of a curriculum design-based (CDB) professional development model on K-12 teachers' capacity to integrate engineering education in the classroom. This teacher professional development approach differs from other training programs where teachers learn how to use a standard curriculum and adopt it in their classrooms. In a CDB professional development model teachers actively design lessons, student resources, and assessments for their classroom instruction. In other science, technology, engineering and mathematics (STEM) disciplines, CDB professional development has been reported to (a) position teachers as architects of change, (b) provide a professional learning vehicle for educators to reflect on instructional practices and develop content knowledge, (c) inspire a sense of ownership in curriculum decision-making among teachers, and (d) use an instructional approach that is coherent with teachers' interests and professional goals. The CDB professional development program in this study used the Explore-Create-Share (ECS) framework as an instructional model to support teacher-led curriculum design and implementation. To evaluate the impact of the CDB professional development and associated ECS instructional model, three research studies were conducted. In each study, the participants completed a six-month CDB professional development program, the PTC STEM Certificate Program, that included sixty-two instructional contact hours. Participants learned about industry and education engineering concepts, tested engineering curricula, collaborated with K-12 educators and industry professionals, and developed project-based engineering curricula using the ECS framework. The first study evaluated the impact of the CDB professional development program on teachers' engineering knowledge, self-efficacy in designing engineering curriculum, and instructional practice in developing project-based engineering units. The study included twenty-six teachers and data was collected pre-, mid-, and post-program using teacher surveys and a curriculum analysis instrument. The second study evaluated teachers' perceptions of the ECS model as a curriculum authoring tool and the quality of the curriculum units they developed. The study included sixty-two participants and data was collected post-program using teacher surveys and a curriculum analysis instrument. The third study evaluated teachers' experiences implementing ECS units in the classroom with a focus on identifying the benefits, challenges and solutions associated with project-based engineering in the classroom. The study included thirty-one participants and data was collected using an open-ended survey instrument after teachers completed implementation of the ECS curriculum unit. Results of these three studies indicate that teachers can be prepared to integrate engineering in the classroom using a CDB professional development model. Teachers reported an increase in engineering content knowledge, improved their self-efficacy in curriculum planning, and developed high quality instructional units that were aligned to engineering design practices and STEM educational standards. The ECS instructional model was acknowledged as a valuable tool for developing and implementing engineering education in the classroom. Teachers reported that ECS curriculum design aligned with their teaching goals, provided a framework to integrate engineering with other subject-area concepts, and incorporated innovative teaching strategies. After implementing ECS units in the classroom, teachers reported that the ECS model engaged students in engineering design challenges that were situated in a real world context and required the application of interdisciplinary content knowledge and skills. Teachers also reported a number of challenges related to scheduling, content alignment, and access to resources. In the face of these obstacles, teachers presented a number of solutions that included optimization of one's teaching practice, being resource savvy, and adopting a growth mindset.

  18. University of Colorado at Boulder: Energy and Climate Revolving Fund. Green Revolving Funds in Action: Case Study Series

    ERIC Educational Resources Information Center

    Caine, Rebecca

    2012-01-01

    The University of Colorado at Boulder's student run Environmental Center leads the campus' sustainability efforts. The Center created the Energy and Climate Revolving Fund (ECRF) in 2007 to finance energy-efficiency upgrades. The ECRF functions as a source of funding for project loans and provides a method of financing projects that seeks to save…

  19. Harvard University: Green Loan Fund. Green Revolving Funds in Action: Case Study Series

    ERIC Educational Resources Information Center

    Foley, Robert

    2011-01-01

    The Green Loan Fund at Harvard University has been an active source of capital for energy efficiency and waste reduction projects for almost a decade. This case study examines the revolving fund's history from its inception as a pilot project in the 1990s to its regeneration in the early 2000s to its current operations today. The green revolving…

  20. Alternative Fuels Data Center

    Science.gov Websites

    ) provides U.S. Environmental Protection Agency Diesel Emissions Reduction Act (DERA) funding for projects that reduce diesel emissions in New Hampshire. Funding for between 25% and 100% of eligible project , or adding idle reduction equipment. For more information, including funding amounts and how to apply

  1. 42 CFR 86.16 - Use of project funds.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES OCCUPATIONAL SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES GRANTS FOR EDUCATION PROGRAMS IN OCCUPATIONAL SAFETY AND HEALTH Occupational Safety and Health Training Grants § 86.16 Use of project funds. (a) Any funds granted pursuant to...

  2. 23 CFR 650.709 - Special considerations.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... candidates in States that have not previously been allocated discretionary bridge funds. In addition, consideration will be given to candidates that receive additional funds or contributions from local, State... share of the project. These funds or contributions may be used to reduce the total project cost for use...

  3. 42 CFR 86.16 - Use of project funds.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES OCCUPATIONAL SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES GRANTS FOR EDUCATION PROGRAMS IN OCCUPATIONAL SAFETY AND HEALTH Occupational Safety and Health Training Grants § 86.16 Use of project funds. (a) Any funds granted pursuant to...

  4. [Research progresses of the completed pediatrics projects funded by National Natural Science Foundation of China from 2002 to 2006].

    PubMed

    Xu, Ling; Hao, Jie; Deng, Min; Xu, Yan-ying

    2009-05-01

    To understand the projects completion and research progresses in pediatrics which were funded by the National Natural Science Foundation of China (NSFC), and evaluate the accomplishment objectively and justly. The completion status of projects in pediatrics funded by department of clinical medicine II from 2002 to 2006 was analysed retrospectively, and important research achievement and outstanding development in some projects were reported. During the period between 2002 and 2006, 420 articles were published, and the average was 8.1 papers per project, which included 56 papers that were published in journals indexed by SCI (the average was 1.1 papers per project). The completion of general project was better than that of "the Young Researchers Fund" and small grant project. Ten post-doctors, 102 doctors and 109 masters were trained. Two projects were awarded with the first grade prize and another 2 with the second grade prize at the provincial and ministerial level, 4 items applied for patent and 1 was granted. These completed projects, which were mainly related to 7 of 12 subspecialties in the field of pediatrics, such as the respiratory disease, nephrology, neurology, cardiology, endocrinology, hematology, neonatology, are the major portion of the application projects and subsidized projects funded by NSFC, and achieved great research progresses. During the period between 2002 and 2006, the 52 completed projects in pediatrics showed difference in the distribution and quality of accomplishment among subspecialties and among types of supported projects; there are some gaps between pediatrics and some other clinical basic subspecialties II, this situation released the research status and problems in development of pediatrics in China. The general projects completion was good, and many projects obtained research achievements, which reflect the leading function of NSFC in pediatric research.

  5. EUFAR the key portal and network for airborne research in Europe

    NASA Astrophysics Data System (ADS)

    Gérard, Elisabeth; Brown, Philip

    2017-04-01

    Created in 2000 and supported by the EU Framework Programmes since then as an Integrating Activities' project, EUFAR (European Facility of Airborne Research in environmental and Geo-sciences) was born out of the necessity to create a central network and access point for the airborne research community in Europe. With the aim to support researchers by granting them access to aircraft and instrumentation most suited to the needs of researchers across Europe, not accessible in their home countries, EUFAR also provides technical support and training in the field of airborne research for the environmental and geosciences, and enables the sharing of expertise and harmonisation of research practices. Today, EUFAR2 (2014-2018) coordinates and facilitates transnational access to 19 instrumented aircraft and 5 remote-sensing instruments through the 14 operators who are part of EUFAR's current 24-partner European consortium. In addition, the current project supports networking and joint research activities focused on providing an enabling environment for and to promote airborne research. Examples of some of these recent activities will be shown EUFAR is currently seeking to establish itself as an AISBL (international non-profit association) to ensure its existence and operations beyond January 2018 when our present EC funding comes to an end. The objectives of the EUFAR AISBL will include continuing to develop the integration of the research aircraft community in Europe and also its links with other environmental research infrastructures, such as the community of research infrastructures under the umbrella of ENVRIplus. Another objective will be to continue to broaden access to research facilities beyond that supported solely by national funding streams so that EUFAR better approaches the status of a European open research infrastructure. Together with the implementation of an Open Access scheme by means of resource-sharing envisaged in late 2017, such a sustainable structure will contribute substantially toward broadening the user base of existing airborne research facilities in Europe and mobilising additional resources to this end. EUFAR AISBL will be the most appropriate organisation for the (i) coordination of joint activities among the European institutions involved in airborne research, and also (ii) coordination of projects funded by the European Commission or other bodies for supporting activities beyond the self-financing perimeter of the AISBL (transnational access projects, education and training events, joint research activities, etc.). This will confirm EUFAR's position as the key portal for airborne research in Europe. This central position opens the way for further collaboration with other communities (UAS, etc.) and environmental research infrastructures (IAGOS, ACTRIS, ENVRIplus, EUROFLEETS, etc.) to ensure the mutual benefit of joint efforts in addressing future science challenges in a multi-disciplinary approach to the study of the Earth system.

  6. Erratum to: The visual amplification of goal-oriented movements counteracts acquired non-use in hemiparetic stroke patients.

    PubMed

    Rubio Ballester, Belén; Nirme, Jens; Duarte, Esther; Cuxart, Ampar; Rodriguez, Susana; Verschure, Paul; Duff, Armin

    2015-11-27

    Unfortunately, in the original version of this article [1] the sentence "This project was supported through ERC project cDAC (FP7-IDEAS-ERC 341196), EC H2020 project socSMCs (H2020-EU.1.2.2. 641321) and MINECO project SANAR (Gobierno de España)" was missing from the acknowledgements.The acknowledgements have been correctly included in full in this erratum.

  7. [Analysis and prospect of projects funded in discipline of microbiology (NSFC) from 2006 to 2010].

    PubMed

    Liao, Hai; Wen, Mingzhang; Yang, Haihua

    2011-01-01

    The overview of projects funded by general programs,key programs and national science fund for distinguished young scholars in discipline of microbiology, National Natural Science Foundation of China (NSFC) from 2006 to 2010 was recommended. Some important characters such as the distribution of projects in different subjects, organizations, regions and research fields were analyzed. Some important research fields which should be supported in "The Twelfth Five-Year Plan" was also put forward. The goal of the paper is to provide information of funding in NSFC for researchers in the field of microbiology.

  8. Association between differential gene expression and body mass index among endometrial cancers from The Cancer Genome Atlas Project.

    PubMed

    Roque, Dario R; Makowski, Liza; Chen, Ting-Huei; Rashid, Naim; Hayes, D Neil; Bae-Jump, Victoria

    2016-08-01

    The Cancer Genome Atlas (TCGA) identified four integrated clusters for endometrial cancer (EC): POLE, MSI, CNL and CNH. We evaluated differences in gene expression profiles of obese and non-obese women with EC and examined the association of body mass index (BMI) within the clusters identified in TCGA. TCGA RNAseq data was used to identify genes related to increasing BMI among ECs. The POLE, MSI and CNL clusters were composed mostly of endometrioid EC. Patient BMI was compared between these three clusters with one-way ANOVA. Association between gene expression and BMI was also assessed while adjusting for confounding effects of potential confounding factors. p-Values testing the association between gene expression and BMI were adjusted for multiple hypothesis testing over the 20,531 genes considered. Mean BMI was statistically different between the ECs in the CNL (35.8) versus POLE (29.8) cluster (p=0.006) and approached significance for the MSI (33.0) versus CNL (35.8) cluster (p=0.05). 181 genes were significantly up- or down-regulated with increasing BMI in endometrioid EC (q-value<0.01), including LPL, IRS-1, IGFBP4, IGFBP7 and the progesterone receptor. DAVID functional annotation analysis revealed significant enrichment in "cell cycle" (adjusted p-value=1.5E-5) and "DNA metabolic processes" (adjusted p-value=1E-3) for the identified genes. Obesity related genes were found to be upregulated with increasing BMI among endometrioid ECs. Patients with POLE tumors have the lowest median BMI when compared to MSI and CNL. Given the heterogeneity among endometrioid EC, consideration should be given to abandoning the Type I and II classification of EC tumors. Copyright © 2016 Elsevier Inc. All rights reserved.

  9. 7 CFR 1783.14 - What are the eligibility criteria for RFP loan recipients?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE (CONTINUED) REVOLVING FUNDS FOR FINANCING WATER AND WASTEWATER PROJECTS (REVOLVING FUND PROGRAM) Revolving Fund Program Loans § 1783.14 What are the eligibility.... (b) The loan recipient must be unable to finance the proposed project from their own resources or...

  10. 77 FR 3784 - Recreational Boating Safety Projects, Programs and Activities Funded Under Provisions of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-25

    ... 21st Century; Accounting of ACTION: Notice. SUMMARY: In 1999, the Transportation Equity Act for the... detailed accounting of the projects, programs, and activities funded under the national recreational... fiscal year 2011 for each activity is shown below. Specific Accounting of Funds National Recreational...

  11. 76 FR 53665 - Nevada and Placer Counties Resource Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-29

    ... relationships and to provide advice and recommendations to the Forest Service concerning projects and funding... discuss and vote on projects submitted for funding and the expenditure of Title II funds benefiting National Forest System lands in Nevada and Placer Counties. DATES: The meeting will be held Wednesday...

  12. 76 FR 53663 - Sierra County Resource Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-29

    ... provide advice and recommendations to the Forest Service concerning projects and funding consistent with... and vote on projects submitted for funding and the expenditure of Title II funds benefiting National Forest System lands in Sierra County. DATES: The meeting will be held Monday, September 12, 2011 at 9 a.m...

  13. 76 FR 53664 - Nevada and Placer Counties Resource Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-29

    ... relationships and to provide advice and recommendations to the Forest Service concerning projects and funding... discuss and vote on projects submitted for funding and the expenditure of Title II funds benefiting National Forest System lands in Nevada and Placer Counties. DATES: The meeting will be held Friday...

  14. 76 FR 53664 - Nevada and Placer Counties Resource Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-29

    ... relationships and to provide advice and recommendations to the Forest Service concerning projects and funding... discuss and vote on projects submitted for funding and the expenditure of Title II funds benefiting National Forest System lands in Nevada and Placer Counties. DATES: The meeting will be held Tuesday...

  15. First Nations Development Institute Biennial Report, 1994/95.

    ERIC Educational Resources Information Center

    First Nations Development Inst., Fredericksburg, VA.

    This report describes economic development projects that were funded during 1994-95 by the First Nations Development Institute. The Institute was established in 1980 to help tribes build sound, sustainable reservation economies. Through the Eagle Staff Fund, the Institute regrants funds for culturally viable economic development projects from a…

  16. Student Projects as a Funding Source

    ERIC Educational Resources Information Center

    Henson, Kerry L.

    2010-01-01

    Prompted by restricted funding for a lab which supported student software development work on real-world projects, a contribution program was established to facilitate monetary support from the external clients. The paper explores the relationships between instructor, students and client and how a funding component can affect these ties.…

  17. 10 CFR 605.12 - Funding.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Funding. 605.12 Section 605.12 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS THE OFFICE OF ENERGY RESEARCH FINANCIAL ASSISTANCE PROGRAM § 605.12 Funding. (a) The project period during which DOE expects to provide support for an approved project under...

  18. 10 CFR 605.12 - Funding.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Funding. 605.12 Section 605.12 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS THE OFFICE OF ENERGY RESEARCH FINANCIAL ASSISTANCE PROGRAM § 605.12 Funding. (a) The project period during which DOE expects to provide support for an approved project under...

  19. 10 CFR 605.12 - Funding.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Funding. 605.12 Section 605.12 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS THE OFFICE OF ENERGY RESEARCH FINANCIAL ASSISTANCE PROGRAM § 605.12 Funding. (a) The project period during which DOE expects to provide support for an approved project under...

  20. 10 CFR 605.12 - Funding.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Funding. 605.12 Section 605.12 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS THE OFFICE OF ENERGY RESEARCH FINANCIAL ASSISTANCE PROGRAM § 605.12 Funding. (a) The project period during which DOE expects to provide support for an approved project under...

  1. 10 CFR 605.12 - Funding.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Funding. 605.12 Section 605.12 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS THE OFFICE OF ENERGY RESEARCH FINANCIAL ASSISTANCE PROGRAM § 605.12 Funding. (a) The project period during which DOE expects to provide support for an approved project under...

  2. Examining Federally Funded Secondary Transition Personnel Preparation Programs

    ERIC Educational Resources Information Center

    Plotner, Anthony J.; Simonsen, Monica L.

    2018-01-01

    The purpose of this study was to examine 41 secondary transition-focused personnel preparation projects funded between 2001 and 2016. Specifically, this study examined the amount and characteristics of these projects through a systematic abstract review. In addition, authors explored key issues in federally funded transition-focused personnel…

  3. Review of the Fiscal Year 2014 (FY14) Defense Environmental International Cooperation (DEIC) Program

    DTIC Science & Technology

    2015-05-01

    above, this spreadsheet lists all proposed projects by project number and title, the DEIC funds requested for each, the funding for approved projects...originating request, including DoD action officer, email address, and commercial and DSN phone number ; 3. Description – Explain why this...3 Numbers do not add to 100 percent (or $1,691,000) because they do not include funding to support overall DEIC

  4. The design of a petabyte archive and distribution system for the NASA ECS project

    NASA Technical Reports Server (NTRS)

    Caulk, Parris M.

    1994-01-01

    The NASA EOS Data and Information System (EOSDIS) Core System (ECS) will contain one of the largest data management systems ever built - the ECS Science and Data Processing System (SDPS). SDPS is designed to support long term Global Change Research by acquiring, producing, and storing earth science data, and by providing efficient means for accessing and manipulating that data. The first two releases of SDPS, Release A and Release B, will be operational in 1997 and 1998, respectively. Release B will be deployed at eight Distributed Active Archiving Centers (DAAC's). Individual DAAC's will archive different collections of earth science data, and will vary in archive capacity. The storage and management of these data collections is the responsibility of the SDPS Data Server subsystem. It is anticipated that by the year 2001, the Data Server subsystem at the Goddard DAAC must support a near-line data storage capacity of one petabyte. The development of SDPS is a system integration effort in which COTS products will be used in favor of custom components in very possible way. Some software and hardware capabilities required to meet ECS data volume and storage management requirements beyond 1999 are not yet supported by available COTS products. The ECS project will not undertake major custom development efforts to provide these capabilities. Instead, SDPS and its Data Server subsystem are designed to support initial implementations with current products, and provide an evolutionary framework that facilitates the introduction of advanced COTS products as they become available. This paper provides a high-level description of the Data Server subsystem design from a COTS integration standpoint, and discussed some of the major issues driving the design. The paper focuses on features of the design that will make the system scalable and adaptable to changing technologies.

  5. Abstracting application deployment on Cloud infrastructures

    NASA Astrophysics Data System (ADS)

    Aiftimiei, D. C.; Fattibene, E.; Gargana, R.; Panella, M.; Salomoni, D.

    2017-10-01

    Deploying a complex application on a Cloud-based infrastructure can be a challenging task. In this contribution we present an approach for Cloud-based deployment of applications and its present or future implementation in the framework of several projects, such as “!CHAOS: a cloud of controls” [1], a project funded by MIUR (Italian Ministry of Research and Education) to create a Cloud-based deployment of a control system and data acquisition framework, “INDIGO-DataCloud” [2], an EC H2020 project targeting among other things high-level deployment of applications on hybrid Clouds, and “Open City Platform”[3], an Italian project aiming to provide open Cloud solutions for Italian Public Administrations. We considered to use an orchestration service to hide the complex deployment of the application components, and to build an abstraction layer on top of the orchestration one. Through Heat [4] orchestration service, we prototyped a dynamic, on-demand, scalable platform of software components, based on OpenStack infrastructures. On top of the orchestration service we developed a prototype of a web interface exploiting the Heat APIs. The user can start an instance of the application without having knowledge about the underlying Cloud infrastructure and services. Moreover, the platform instance can be customized by choosing parameters related to the application such as the size of a File System or the number of instances of a NoSQL DB cluster. As soon as the desired platform is running, the web interface offers the possibility to scale some infrastructure components. In this contribution we describe the solution design and implementation, based on the application requirements, the details of the development of both the Heat templates and of the web interface, together with possible exploitation strategies of this work in Cloud data centers.

  6. MHD technology transfer, integration, and review committee

    NASA Astrophysics Data System (ADS)

    1990-05-01

    As part of Task 8 of the magnetohydrodynamic (MHD) Integrated Topping Cycle (ITC) project, TRW was given the responsibility to organize, charter and co-chair, with the Department of Energy (DOE), an MHD Technology Transfer, Integration and Review Committee (TTIRC). The TTIRC consists of an Executive Committee (EC) which acts as the governing body, and a General Committee (GC), also referred to as the main or full committee, consisting of representatives from the various POC contractors, participating universities and national laboratories, utilities, equipment suppliers, and other potential MHD users or investors. The purpose of the TTIRC is to: (1) review all Proof-of-Concept (POC) projects and schedules in the national MHD program; to assess their compatibility with each other and the first commercial MHD retrofit plant; (2) establish and implement technology transfer formats for users of this technology; (3) identify interfaces, issues, and funding structures directly impacting the success of the commercial retrofit; (4) investigate and identify the manner in which, and by whom, the above should be resolved; and (5) investigate and assess other participation (foreign and domestic) in the U.S. MHD Program. There are seven sections: introduction; Executive Committee and General Committee activity; Committee activities related to technology transfer; ongoing POC integration activities being performed under the auspices of the Executive Committee; recommendations passed on to the DOE by the Executive Committee; Planned activities for the next six months.

  7. Microanalytical investigation of degradation issues in Byzantine wall paintings

    NASA Astrophysics Data System (ADS)

    Sotiropoulou, S.; Daniilia, Sister; Miliani, C.; Rosi, F.; Cartechini, L.; Papanikola-Bakirtzis, D.

    2008-07-01

    The St. Euthymius wall paintings, in the Cathedral of Thessaloniki, dated 1303 AD., are stylistically attributed to the School of Panselinos, one of the most important painters of Palaeologean Art. An in situ non-invasive study has been carried out as part of a MOLAB project (a mobile laboratory accessible through the Eu-ARTECH project, funded by the EC 6th FP) combining different analytical techniques such as XRF, mid-FTIR and UV-vis diffuse reflectance spectroscopy. It was during this comprehensive in situ study that certain scientific queries were raised about sensitive areas, where indications of the phenomena of decay requested further attention. A subsequent laboratory study of selected cross-sections using microscopic analysis with μFTIR, SEM-EDS and μRaman, further confirmed the identification of only the atypical in situ observations. The comparative interpretation of all respective results on the specific regions of interest permitted the identification of several degradation phenomena which justify certain aesthetic or stylistic incoherences in the representations. Namely, (i) thermal dehydration of the yellow ochre explaining the reddish appearance of the flesh tones and halos as an accidental effect of the fire; (ii) thermal degradation of azurite converted to tenorite explaining the atypical instance of dark lightings on the purple garments; (iii) degradation of red lead employed in the lightings of the red garments; (iv) widespread presence of oxalates in the paint surface.

  8. Stochastic modelling of human exposure to food chemicals and nutrients within the "Montecarlo" project: an exploration of the influence of brand loyalty and market share on intake estimates of intense sweeteners from sugar-free soft drinks.

    PubMed

    Leclercq, Catherine; Arcella, Davide; Le Donne, Cinzia; Piccinelli, Raffaela; Sette, Stefania; Soggiu, Maria Eleonora

    2003-04-11

    To get a more realistic view of exposure to food chemicals, risk managers are getting more interested in stochastic modelling as an alternative to deterministic approaches based on conservative assumptions. It allows to take into account all the available information in the concentration of the chemical present in foods and in food consumption patterns. Within the EC-funded "Montecarlo" project, a comprehensive set of mathematical algorithms was developed to take into account all the necessary components for stochastic modelling of a variety of food chemicals, nutrients and ingredients. An appropriate computer software is being developed. Since the concentration of food chemicals may vary among different brands of the same product, consumer behaviour with respect to brands may have an impact on exposure assessments. Numeric experiments were carried out on different ways of incorporating indicators of market share and brand loyalty in the mathematical algorithms developed within the stochastic model of exposure to intense sweeteners from sugar-free beverages. The 95th percentiles of intake were shown to vary according to the inclusion/exclusion of these indicators. The market share should be included in the model especially if the market is not equitably distributed between brands. If brand loyalty data are not available, the model may be run under theoretical scenarios.

  9. The Strategy of Elaborating a Common Approach to Solve the Problems of Surface and Ground Waters Contamination at the PA "Mayak" Territory Based on the International Co-operation Experience

    NASA Astrophysics Data System (ADS)

    Glinsky, M.; Hutter, A.; Drozhko, E. G.

    2001-12-01

    In the early 90's international organizations showed great interest concerning the contamination problems at the PA "Mayak" territory, where liquid radioactive wastes have been stored on the surface, including Lake Karachay, reservoir "Staroye Boloto" and the Techa River cascade reservoirs. As a result of this interest, international contracts funded by DOE (USA), NRRA, EC and DGXL were instituted to study the experience of radioactive waste management accumulated at the PA "Mayak" territory, including proposed rehabilitation of the contaminated territories. However, at the initial stage of international research, the works were not coordinated and often duplicated each other, which was taken by the public and mass media as a serious divergence of opinion between the scientists on the risk assessment for the population. Many years of research resulted in elaboration of a common scientific approach to the solution of the problems of water resources contamination at the PA "Mayak" territory. A successful experience of coordinating the international projects to study radionuclide migration with surface and ground waters at the PA "Mayak" territory is demonstrated, as well as the risk assessment for the population. Substantiation for rehabilitation measures can be based on long-term predictions and modeling research that are continuing under these international projects.

  10. 7 CFR 4280.173 - Grant funding for feasibility studies.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... costs will be considered eligible. Eligible project costs for renewable energy system feasibility... America Program General Renewable Energy System Feasibility Study Grants § 4280.173 Grant funding for...; and (3) Environmental study. (c) Ineligible project costs. Ineligible project costs for renewable...

  11. 7 CFR 4280.173 - Grant funding for feasibility studies.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... costs will be considered eligible. Eligible project costs for renewable energy system feasibility... America Program General Renewable Energy System Feasibility Study Grants § 4280.173 Grant funding for...; and (3) Environmental study. (c) Ineligible project costs. Ineligible project costs for renewable...

  12. 7 CFR 4280.173 - Grant funding for feasibility studies.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... costs will be considered eligible. Eligible project costs for renewable energy system feasibility... America Program General Renewable Energy System Feasibility Study Grants § 4280.173 Grant funding for...; and (3) Environmental study. (c) Ineligible project costs. Ineligible project costs for renewable...

  13. 49 CFR 602.13 - Eligible activities.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) Emergency repairs; (4) Permanent repairs; (5) Actual engineering and construction costs on approved projects... maintenance; (2) Project costs for which the recipient has received funding from another Federal agency; (3) Project costs for which the recipient has received funding through payments from insurance policies; (4...

  14. Analysis of Construction Quality Assurance Procedures on Federally Funded Local Public Agency Projects

    DOT National Transportation Integrated Search

    2016-07-01

    Approximately 20 percent of the Federal-aid highway program is invested in local public agency (LPA) infrastructure projects, which is a significant portion of total Federal funds allocated to highway construction projects in the United States. In re...

  15. European Science Notes Information Bulletin.

    DTIC Science & Technology

    1992-12-01

    the rest from competitive research "not free" in their expression in or out of class, funded by Bonn or the EC. The one eastie I had a chance to talk...is a long way off because tions in Lead Time at Volvo Based on Restructur- the walls are high and people are hard to change. ing the Design Process...linked to each other. ( Energy flowing from Prof. Krause. out of one element can flow into

  16. Diabetic nephropathy research in China: Data analysis and review from the National Natural Science Foundation of China.

    PubMed

    Wan, Qiang; Xu, Yanying; Dong, Erdan

    2015-05-01

    As the largest funding agency of natural science of China, the National Natural Science Foundation of China (NSFC) has made great efforts in promoting the development of diabetic nephropathy (DN) research in recent years. The aim of the current study is to summarize the diabetic nephropathy research in China by analyzing NSFC-funded projects. Data on all projects in the DN field funded by NSFC from 1986 to 2013 were collected. The funding tendency, funding areas, and hotspots in the DN field, and major research institutions, were analyzed. As one output of this support, outstanding research groups in China, and their representative studies, are also highlighted. From 1986 to 2013, the NSFC has funded a total of 248 projects in the DN field, with a total funding amount of 91.5 million RMB (US$14.9 million). A rapid increase could be seen in the past 5 years, with an average annual 30% increase in projects numbers and a 52% increase in funding amount. All fields in DN research have been covered by the NSFC, including etiology, pathophysiology, diagnostics, and therapeutics. Along with increased funding of the DN research, there has been a growth in the papers published in Science Citation Index journals by Chinese scholars. In the past decade, the funding scale and funding budget have increased dramatically. Benefiting from this, DN research in China has also made considerable progression. © 2015 Ruijin Hospital, Shanghai Jiaotong University School of Medicine and Wiley Publishing Asia Pty Ltd.

  17. An Assessment of Radiation Modification from a European Perspective

    NASA Astrophysics Data System (ADS)

    Kristjansson, J. E.; Lawrence, M. G.; Boucher, O.; Haywood, J. M.; Irvine, P. J.; Muri, H.; Schmidt, H.; Schulz, M.; Vaughan, N.; Watson, M.; Born, W.; Schaefer, S.; Stelzer, H.

    2014-12-01

    The European Transdisciplinary Assessment of Climate Engineering (EuTRACE) project (2012-2014) is funded by the European Commission (EC). In EuTRACE, researchers from the natural sciences, social sciences and the humanities have joined forces to assess various proposed geoengineering techniques concerning their radiative forcing potential and side effects, ethical aspects, economics aspects, as well as governance and regulation aspects. A comprehensive assessment report will be submitted to the EC in autumn 2014. We will present some highlights of the part of the EuTRACE assessment that deals with the natural science aspects of proposed Radiation Modification (RM) techniques. The techniques considered are: a) Stratospheric Sulfur Injections; b) Marine Cloud Brightening; c) Desert Brightening; d) Vegetation Brightening; and e) Cirrus Cloud Thinning. A large number of publications in the scientific literature has been considered, as well as recently published assessment reports by the Royal Society in the UK and the German Federal Ministry of Education and Research. Some of the findings of the assessment are: Globally averaged, the current anthropogenic radiative forcing could conceivably be offset by the RM techniques considered. The RM techniques could have a significant global effect already after 1 year or less. Model simulations consistently show that Solar RM leads to regional imbalances due to different spatial footprints of solar and carbon dioxide radiative forcings. This may have significant consequences for precipitation patterns and the hydrological cycle. Very rapid warming is virtually certain if RM were to be stopped abruptly or over a period of one to a few years. Model studies of RM usually assume that the techniques are technologically feasible. In fact, the technological challenges are poorly known, and in many cases the physical processes involved are poorly understood. We will end by discussing key research questions and knowledge gaps.

  18. Army Projects in the DOD Near Term Energy-Efficient Technologies Program Funded by the American Recovery and Reinvestment Act of 2009

    DTIC Science & Technology

    2010-08-27

    adverse impact to critical missions caused by natural, accidental, or intentional events adversely affecting installation energy and utility supply...Report No. D-2010-RAM-019 August 27, 2010 Army Projects in the DOD Near Term Energy -Efficient Technologies Program Funded...Army Projects in the DOD Near Term Energy -Efficient Technologies Program Funded by the American Recovery and Reinvestment Act of 2009 5a. CONTRACT

  19. Prevalence and Correlates of the Belief That Electronic Cigarettes are a Lot Less Harmful Than Conventional Cigarettes Under the Different Regulatory Environments of Australia and the United Kingdom

    PubMed Central

    Borland, Ron; Balmford, James; Hitchman, Sara C.; Cummings, K. Michael; Driezen, Pete; Thompson, Mary E.

    2017-01-01

    Introduction: The rapid rise in electronic cigarettes (ECs) globally has stimulated much debate about the relative risk and public health impact of this new emerging product category as compared to conventional cigarettes. The sale and marketing of ECs containing nicotine are banned in many countries (eg, Australia) but are allowed in others (eg, United Kingdom). This study examined prevalence and correlates of the belief that ECs are a lot less harmful than conventional cigarettes under the different regulatory environments in Australia (ie, more restrictive) and the United Kingdom (ie, less restrictive). Methods: Australian and UK data from the 2013 survey of the International Tobacco Control Four-Country project were analyzed. Results: More UK than Australian respondents (58.5% vs. 35.2%) believed that ECs are a lot less harmful than conventional cigarettes but more respondents in Australia than in the United Kingdom selected “Don’t Know” (36.5% vs. 17.1%). The proportion that responded “A little less, equally or more harmful” did not differ between countries. Correlates of the belief that ECs are “A lot less harmful” differed between countries, while correlates of “Don’t Know” response did not differ. Conclusions: Consistent with the less restrictive regulatory environment affecting the sale and marketing of ECs, smokers and recent ex-smokers in the United Kingdom were more likely to believe ECs were less harmful relative to conventional cigarettes compared to those in Australia. Implications: What this study adds: Among smokers and ex-smokers, this study found that the belief that ECs are (a lot) less harmful than conventional cigarettes was considerably higher in the United Kingdom than in Australia in 2013. The finding is consistent with the less restrictive regulatory environment for ECs in the United Kingdom, suggesting that the regulatory framework for ECs adopted by a country can affect smokers’ perceptions about the relative harmfulness of ECs, the group that stands to gain the most from having an accurate belief about the relative harms of ECs. PMID:27190403

  20. Prevalence and Correlates of the Belief That Electronic Cigarettes are a Lot Less Harmful Than Conventional Cigarettes Under the Different Regulatory Environments of Australia and the United Kingdom.

    PubMed

    Yong, Hua-Hie; Borland, Ron; Balmford, James; Hitchman, Sara C; Cummings, K Michael; Driezen, Pete; Thompson, Mary E

    2017-02-01

    The rapid rise in electronic cigarettes (ECs) globally has stimulated much debate about the relative risk and public health impact of this new emerging product category as compared to conventional cigarettes. The sale and marketing of ECs containing nicotine are banned in many countries (eg, Australia) but are allowed in others (eg, United Kingdom). This study examined prevalence and correlates of the belief that ECs are a lot less harmful than conventional cigarettes under the different regulatory environments in Australia (ie, more restrictive) and the United Kingdom (ie, less restrictive). Australian and UK data from the 2013 survey of the International Tobacco Control Four-Country project were analyzed. More UK than Australian respondents (58.5% vs. 35.2%) believed that ECs are a lot less harmful than conventional cigarettes but more respondents in Australia than in the United Kingdom selected "Don't Know" (36.5% vs. 17.1%). The proportion that responded "A little less, equally or more harmful" did not differ between countries. Correlates of the belief that ECs are "A lot less harmful" differed between countries, while correlates of "Don't Know" response did not differ. Consistent with the less restrictive regulatory environment affecting the sale and marketing of ECs, smokers and recent ex-smokers in the United Kingdom were more likely to believe ECs were less harmful relative to conventional cigarettes compared to those in Australia. What this study adds: Among smokers and ex-smokers, this study found that the belief that ECs are (a lot) less harmful than conventional cigarettes was considerably higher in the United Kingdom than in Australia in 2013. The finding is consistent with the less restrictive regulatory environment for ECs in the United Kingdom, suggesting that the regulatory framework for ECs adopted by a country can affect smokers' perceptions about the relative harmfulness of ECs, the group that stands to gain the most from having an accurate belief about the relative harms of ECs. © The Author 2016. Published by Oxford University Press on behalf of the Society for Research on Nicotine and Tobacco.

  1. 7 CFR 4285.46 - Prohibited use of cooperative agreement funds.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... programs designed to build the image of the State's agriculture or of a particular State Department of Agriculture or Agricultural Experiment Station. (e) Project funds cannot be used to pay for the salary and... Experiment Stations, and other State agencies cannot charge their salaries and travel to project funds, with...

  2. 78 FR 13609 - Environmental Impact and Related Procedures

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-28

    ... right-of-way and projects receiving limited Federal funding, as described in MAP-21. The Agencies seek... Improvement Program, which specifically include all capital transit projects eligible for funding under... facility eligible for funding under title 23, U.S.C., or chapter 53 of title 49, U.S.C. The geographic area...

  3. Beta: An Experiment in Funded Undergraduate Start-Up

    ERIC Educational Resources Information Center

    Jones, Paul; Forbes-Simpson, Kellie; Maas, Gideon; Newbery, Robert

    2015-01-01

    This paper reports on an evaluation of a funded undergraduate project designed to enable student business start-up. The programme, entitled "Beta", provides undergraduate students with £1,500 of seed-corn funding. The key objective of the project is for the participants to exit it with a viable and legal business entity through which…

  4. 10 CFR 904.5 - Revenue requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... into the Colorado River Dam Fund. All receipts from the Project shall be available for payment of the... responsible for the administration of the Colorado River Dam Fund. (b) The electric service revenue of the... Treasury of the advances to the Colorado River Dam Fund for the Project made prior to May 31, 1987, for...

  5. 77 FR 9916 - Riverbank Hydro No. 2, LLC; Lock+ Hydro Friends Fund XXXVI; Notice Announcing Preliminary Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-21

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14130-000; 14137-000] Riverbank Hydro No. 2, LLC; Lock+ Hydro Friends Fund XXXVI; Notice Announcing Preliminary Permit Drawing The...+ Hydro Friends Fund XXXVI for Project No. 14137-000. \\1\\ Under the Commission's Rules of Practice and...

  6. The Tuition Advance Fund: An Analysis Prepared for Boston University.

    ERIC Educational Resources Information Center

    Botsford, Keith

    Three models for anlayzing the Tuition Advance Fund (TAF) are examined. The three models are: projections by the Institute for Demographic and Economic Studies (IDES), projections by Data Resources, Inc. (DRI), and the Tuition Advance Fund Simulation (TAFSIM) models from Boston University. Analysis of the TAF is based on enrollment, price, and…

  7. School Building Construction Through Private Funds in a Small School District.

    ERIC Educational Resources Information Center

    Brames, Fred

    The private corporation leasing arrangement, as a source of school construction funds, is increasingly being used in Indiana; however, the principles are applicable in any state. The private corporation charges a project fee, which represents its maximum anticipated profit. The private corporation obtains the funds for the project; makes the…

  8. 10 CFR 904.5 - Revenue requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... into the Colorado River Dam Fund. All receipts from the Project shall be available for payment of the... responsible for the administration of the Colorado River Dam Fund. (b) The electric service revenue of the... Treasury of the advances to the Colorado River Dam Fund for the Project made prior to May 31, 1987, for...

  9. 10 CFR 904.5 - Revenue requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... into the Colorado River Dam Fund. All receipts from the Project shall be available for payment of the... responsible for the administration of the Colorado River Dam Fund. (b) The electric service revenue of the... Treasury of the advances to the Colorado River Dam Fund for the Project made prior to May 31, 1987, for...

  10. 10 CFR 904.3 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Hoover Power Plant Act (43 U.S.C. 619). (d) Central Arizona Project shall mean those works as described... amended. (e) Colorado River Dam Fund or Fund shall mean that special fund established by section 2 of the..., the Colorado River Basin Project Act of 1968, and the Hoover Power Plant Act. (f) Contract shall mean...

  11. 10 CFR 904.5 - Revenue requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... into the Colorado River Dam Fund. All receipts from the Project shall be available for payment of the... responsible for the administration of the Colorado River Dam Fund. (b) The electric service revenue of the... Treasury of the advances to the Colorado River Dam Fund for the Project made prior to May 31, 1987, for...

  12. 10 CFR 904.3 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Hoover Power Plant Act (43 U.S.C. 619). (d) Central Arizona Project shall mean those works as described... amended. (e) Colorado River Dam Fund or Fund shall mean that special fund established by section 2 of the..., the Colorado River Basin Project Act of 1968, and the Hoover Power Plant Act. (f) Contract shall mean...

  13. 10 CFR 904.3 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Hoover Power Plant Act (43 U.S.C. 619). (d) Central Arizona Project shall mean those works as described... amended. (e) Colorado River Dam Fund or Fund shall mean that special fund established by section 2 of the..., the Colorado River Basin Project Act of 1968, and the Hoover Power Plant Act. (f) Contract shall mean...

  14. 10 CFR 904.3 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Hoover Power Plant Act (43 U.S.C. 619). (d) Central Arizona Project shall mean those works as described... amended. (e) Colorado River Dam Fund or Fund shall mean that special fund established by section 2 of the..., the Colorado River Basin Project Act of 1968, and the Hoover Power Plant Act. (f) Contract shall mean...

  15. 10 CFR 904.3 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Hoover Power Plant Act (43 U.S.C. 619). (d) Central Arizona Project shall mean those works as described... amended. (e) Colorado River Dam Fund or Fund shall mean that special fund established by section 2 of the..., the Colorado River Basin Project Act of 1968, and the Hoover Power Plant Act. (f) Contract shall mean...

  16. The Impact of Project-Based Learning on Pre-Service Teachers' Technology Attitudes and Skills

    ERIC Educational Resources Information Center

    Alexander, Curby; Knezek, Gerald; Christensen, Rhonda; Tyler-Wood, Tandra; Bull, Glen

    2014-01-01

    Researchers in this study looked at the effect of content-specific, technology-rich project-based learning activities on EC-8 pre-service teachers' competencies and skills, as well as pre-service teacher's attitudes toward science, technology, engineering and mathematics (STEM). Researchers employed a quantitative design involving participants in…

  17. Using "EC-Assess" to Assess a Small Biofuels Project in Honduras

    ERIC Educational Resources Information Center

    Ngassa, Franklin Chamda

    2010-01-01

    Biofuels may contribute to both rural economic development and climate change mitigation and adaptation. The Gota Verde Project in Yoro, Honduras, attempts to demonstrate the technical and economic feasibility of small-scale biofuel production for local use by implementing a distinctive approach to feedstock production that encourages small farm…

  18. Factors that enable and hinder the implementation of projects in the alcohol and other drug field.

    PubMed

    MacLean, Sarah; Berends, Lynda; Hunter, Barbara; Roberts, Bridget; Mugavin, Janette

    2012-02-01

    Few studies systematically explore elements of successful project implementation across a range of alcohol and other drug (AOD) activities. This paper provides an evidence base to inform project implementation in the AOD field. We accessed records for 127 completed projects funded by the Alcohol, Education and Rehabilitation Foundation from 2002 to 2008. An adapted realist synthesis methodology enabled us to develop categories of enablers and barriers to successful project implementation, and to identify factors statistically associated with successful project implementation, defined as meeting all funding objectives. Thematic analysis of eight case study projects allowed detailed exploration of findings. Nine enabler and 10 barrier categories were identified. Those most frequently reported as both barriers and enablers concerned partnerships with external agencies and communities, staffing and project design. Achieving supportive relationships with partner agencies and communities, employing skilled staff and implementing consumer or participant input mechanisms were statistically associated with successful project implementation. The framework described here will support development of evidence-based project funding guidelines and project performance indicators. The study provides evidence that investing project hours and resources to develop robust relationships with project partners and communities, implementing mechanisms for consumer or participant input and attracting skilled staff are legitimate and important activities, not just in themselves but because they potentially influence achievement of project funding objectives. © 2012 The Authors. ANZJPH © 2012 Public Health Association of Australia.

  19. 23 CFR 940.11 - Project implementation.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... projects funded with highway trust funds shall be based on a systems engineering analysis. (b) The analysis should be on a scale commensurate with the project scope. (c) The systems engineering analysis shall... definitions; (4) Analysis of alternative system configurations and technology options to meet requirements; (5...

  20. 23 CFR 940.11 - Project implementation.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... projects funded with highway trust funds shall be based on a systems engineering analysis. (b) The analysis should be on a scale commensurate with the project scope. (c) The systems engineering analysis shall... definitions; (4) Analysis of alternative system configurations and technology options to meet requirements; (5...

  1. 23 CFR 940.11 - Project implementation.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... projects funded with highway trust funds shall be based on a systems engineering analysis. (b) The analysis should be on a scale commensurate with the project scope. (c) The systems engineering analysis shall... definitions; (4) Analysis of alternative system configurations and technology options to meet requirements; (5...

  2. 23 CFR 940.11 - Project implementation.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... projects funded with highway trust funds shall be based on a systems engineering analysis. (b) The analysis should be on a scale commensurate with the project scope. (c) The systems engineering analysis shall... definitions; (4) Analysis of alternative system configurations and technology options to meet requirements; (5...

  3. 23 CFR 940.11 - Project implementation.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... projects funded with highway trust funds shall be based on a systems engineering analysis. (b) The analysis should be on a scale commensurate with the project scope. (c) The systems engineering analysis shall... definitions; (4) Analysis of alternative system configurations and technology options to meet requirements; (5...

  4. 40 CFR 57.603 - Criteria for approval.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... the proposed funding and staffing of the project appear adequate for its successful completion; (c) Whether the proposed level of funding for the project is consistent with the research and development... pollutants of both occupational and environmental significance; (f) The potential effects of the project on...

  5. 40 CFR 57.603 - Criteria for approval.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the proposed funding and staffing of the project appear adequate for its successful completion; (c) Whether the proposed level of funding for the project is consistent with the research and development... pollutants of both occupational and environmental significance; (f) The potential effects of the project on...

  6. 40 CFR 57.603 - Criteria for approval.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... the proposed funding and staffing of the project appear adequate for its successful completion; (c) Whether the proposed level of funding for the project is consistent with the research and development... pollutants of both occupational and environmental significance; (f) The potential effects of the project on...

  7. 40 CFR 57.603 - Criteria for approval.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... the proposed funding and staffing of the project appear adequate for its successful completion; (c) Whether the proposed level of funding for the project is consistent with the research and development... pollutants of both occupational and environmental significance; (f) The potential effects of the project on...

  8. Notification: Notification of Preliminary Research to Evaluate the Clean Water State Revolving Fund Green Project Reserve Program

    EPA Pesticide Factsheets

    Project #OPE-FY15-0009, November 12, 2014. The EPA OIG plans to begin preliminary research on the EPA’s efforts to effectively manage the Clean Water State Revolving Fund (CWSRF) Green Project Reserve (GPR) Program.

  9. 76 FR 1437 - Issuance of Final Policy Directive

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-10

    ... to fund medically based activities in projects that address such health issues as diabetes prevention... and program clarifications, modifications, and activities for the fiscal year (FY) 2011 FOAs. The... previously funded projects proposed by the same applicant or activities or projects proposed by a consortium...

  10. [Public financing of health research in Chile].

    PubMed

    Paraje, Guillermo

    2010-01-01

    In Chile, researchers can apply to public research funds through specific research projects and must compete with other professionals of other disciplines. To perform a critical assessment of the allocation of public funds for health research in Chile by a public institution called CONICYT. A database was constructed with health projects financed by CONICYT, between 2002 and 2006. Projects were classified (according to their titles) in three methodological categories and nine topics. Age, gender and region where the main researcher is based, were also recorded. 768 research projects were analyzed. Biomedical, clinical and public health research projects accounted for 66, 24 and 10% of allocated funds, respectively. Main researchers were female in 31 % of projects, their mean age was 52 years and 76% worked in the Metropolitan region. These results show that some objectives of the National Research System lead by CONICYT, such as using research as a tool for regional development and allocating funds for conditions with a large burden, are not been met.

  11. Resource Planning and Management: Job One for Software Project Managers

    DTIC Science & Technology

    2011-05-01

    negotiation based on mutual understanding of and belief i th j t t t i lAcceptancen e pro ec managemen r ang e – Project leaders need to communicate...Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that...puts the figure at $1.22 T (even more zeros) Constant barrage of project doom and gloom Optimize tomorrow today.TM …. Reasons for Project

  12. Uncover the Cloud for Geospatial Sciences and Applications to Adopt Cloud Computing

    NASA Astrophysics Data System (ADS)

    Yang, C.; Huang, Q.; Xia, J.; Liu, K.; Li, J.; Xu, C.; Sun, M.; Bambacus, M.; Xu, Y.; Fay, D.

    2012-12-01

    Cloud computing is emerging as the future infrastructure for providing computing resources to support and enable scientific research, engineering development, and application construction, as well as work force education. On the other hand, there is a lot of doubt about the readiness of cloud computing to support a variety of scientific research, development and educations. This research is a project funded by NASA SMD to investigate through holistic studies how ready is the cloud computing to support geosciences. Four applications with different computing characteristics including data, computing, concurrent, and spatiotemporal intensities are taken to test the readiness of cloud computing to support geosciences. Three popular and representative cloud platforms including Amazon EC2, Microsoft Azure, and NASA Nebula as well as a traditional cluster are utilized in the study. Results illustrates that cloud is ready to some degree but more research needs to be done to fully implemented the cloud benefit as advertised by many vendors and defined by NIST. Specifically, 1) most cloud platform could help stand up new computing instances, a new computer, in a few minutes as envisioned, therefore, is ready to support most computing needs in an on demand fashion; 2) the load balance and elasticity, a defining characteristic, is ready in some cloud platforms, such as Amazon EC2, to support bigger jobs, e.g., needs response in minutes, while some are not ready to support the elasticity and load balance well. All cloud platform needs further research and development to support real time application at subminute level; 3) the user interface and functionality of cloud platforms vary a lot and some of them are very professional and well supported/documented, such as Amazon EC2, some of them needs significant improvement for the general public to adopt cloud computing without professional training or knowledge about computing infrastructure; 4) the security is a big concern in cloud computing platform, with the sharing spirit of cloud computing, it is very hard to ensure higher level security, except a private cloud is built for a specific organization without public access, public cloud platform does not support FISMA medium level yet and may never be able to support FISMA high level; 5) HPC jobs needs of cloud computing is not well supported and only Amazon EC2 supports this well. The research is being taken by NASA and other agencies to consider cloud computing adoption. We hope the publication of the research would also benefit the public to adopt cloud computing.

  13. Continuous Efforts to Develop the National System for Material Control and Accounting Training at the George Kuzmycz Training Center

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gavrilyuk, Victor I.; Kirischuk, Volodymyr; Romanova, Olena

    2011-10-01

    The George Kuzmycz Training Center (GKTC) for Physical Protection, Control and Accounting of Nuclear Materials was established in 1998 at the Kyiv Institute of Nuclear Research of the Ukrainian Academy of Sciences through the collaborative efforts of the United States and Ukraine. Later the European Commission (EC) joined the US in assisting with the Material Control and Accounting (MC&A) part of the GKTC training program. The Government of Ukraine designated the GKTC as the National Center responsible for providing training and methodological support for nuclear facilities and nuclear specialists in the Material Protection, Control and Accounting (MPC&A) area. To increasemore » the efficiency of the State MC&A system an essential number of new regulations, norms and rules have been developed; some of them mandate regular and more intensive training of MC&A specialists in the industry - from those working at the Nuclear Regulatory Authority of Ukraine to the personnel of nuclear facilities. To meet such regulations GKTC plans to develop next year a number of training courses under the EC contract; such courses will reflect both the specifics of Ukrainian nuclear facilities and the level of expertise of the facilities’ personnel. The NDA training laboratory, established in 2003 with US DOE financial support and technical and methodological assistance, considerably expanded the GKTC’s training capabilities for MC&A programs. Next year that lab will be supplemented with a new NM Surveillance and Containment laboratory as current plans call for under the EC contract. The US DOE is also providing funding to support that project. Under the EC contract the laboratory will be equipped with state-of-the-art, advanced surveillance and containment equipment which will strengthen and expand even further the GKTC’s training capabilities and potential. This will allow GKTC to train Ukrainian nuclear industry specialists in practically all MC&A topics. Furthermore, GKTC is planning to offer already this year and to continue offering in the future, on a regular basis, the courses that have already been developed, while continuing to develop new ones. This paper briefly describes the work done to upgrade the Ukrainian MC&A system, both at the State and at the facilities’ levels, as well as the results of efforts to develop the National System for training MC&A personnel at the GKTC. It also describes problems encountered and their solution; it includes comments, suggestions and recommendations for future activities to promote and improve the nuclear material management culture in Ukraine.« less

  14. A model for making project funding decisions at the National Cancer Institute.

    PubMed

    Hall, N G; Hershey, J C; Kessler, L G; Stotts, R C

    1992-01-01

    This paper describes the development of a model for making project funding decisions at The National Cancer Institute (NCI). The American Stop Smoking Intervention Study (ASSIST) is a multiple-year, multiple-site demonstration project, aimed at reducing smoking prevalence. The initial request for ASSIST proposals was answered by about twice as many states as could be funded. Scientific peer review of the proposals was the primary criterion used for funding decisions. However, a modified Delphi process made explicit several criteria of secondary importance. A structured questionnaire identified the relative importance of these secondary criteria, some of which we incorporated into a composite preference function. We modeled the proposal funding decision as a zero-one program, and adjusted the preference function and available budget parametrically to generate many suitable outcomes. The actual funding decision, identified by our model, offers significant advantages over manually generated solutions found by experts at NCI.

  15. 49 CFR 268.21 - Down-selection of one or more Maglev projects for further study and selection of one project for...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... further study and selection of one project for final design, engineering, and construction funding. 268.21... and selection of one project for final design, engineering, and construction funding. (a) Upon... analyses necessary prior to initiation of construction. Final design and engineering work will also be...

  16. 49 CFR 268.21 - Down-selection of one or more Maglev projects for further study and selection of one project for...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... further study and selection of one project for final design, engineering, and construction funding. 268.21... and selection of one project for final design, engineering, and construction funding. (a) Upon... analyses necessary prior to initiation of construction. Final design and engineering work will also be...

  17. 49 CFR 268.21 - Down-selection of one or more Maglev projects for further study and selection of one project for...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... further study and selection of one project for final design, engineering, and construction funding. 268.21... and selection of one project for final design, engineering, and construction funding. (a) Upon... analyses necessary prior to initiation of construction. Final design and engineering work will also be...

  18. 49 CFR 268.21 - Down-selection of one or more Maglev projects for further study and selection of one project for...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... further study and selection of one project for final design, engineering, and construction funding. 268.21... and selection of one project for final design, engineering, and construction funding. (a) Upon... analyses necessary prior to initiation of construction. Final design and engineering work will also be...

  19. 49 CFR 268.21 - Down-selection of one or more Maglev projects for further study and selection of one project for...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... further study and selection of one project for final design, engineering, and construction funding. 268.21... and selection of one project for final design, engineering, and construction funding. (a) Upon... analyses necessary prior to initiation of construction. Final design and engineering work will also be...

  20. Eddy covariance captures four-phase crassulacean acid metabolism (CAM) gas exchange signature in Agave.

    PubMed

    Owen, Nick A; Choncubhair, Órlaith Ní; Males, Jamie; Del Real Laborde, José Ignacio; Rubio-Cortés, Ramón; Griffiths, Howard; Lanigan, Gary

    2016-02-01

    Mass and energy fluxes were measured over a field of Agave tequilana in Mexico using eddy covariance (EC) methodology. Data were gathered over 252 d, including the transition from wet to dry periods. Net ecosystem exchanges (FN,EC ) displayed a crassulacean acid metabolism (CAM) rhythm that alternated from CO2 sink at night to CO2 source during the day, and partitioned canopy fluxes (FA,EC ) showed a characteristic four-phase CO2 exchange pattern. Results were cross-validated against diel changes in titratable acidity, leaf-unfurling rates, energy exchange fluxes and reported biomass yields. Projected carbon balance (g C m(-2)  year(-1) , mean ± 95% confidence interval) indicated the site was a net sink of -333 ± 24, of which contributions from soil respiration were +692 ± 7, and FA,EC was -1025 ± 25. EC estimated biomass yield was 20.1 Mg (dry) ha(-1)  year(-1) . Average integrated daily FA,EC was -234 ± 5 mmol CO2  m(-2)  d(-1) and persisted almost unchanged after 70 d of drought conditions. Regression analyses were performed on the EC data to identify the best environmental predictors of FA . Results suggest that the carbon acquisition strategy of Agave offers productivity and drought resilience advantages over conventional semi-arid C3 and C4 bioenergy candidates. © 2015 John Wiley & Sons Ltd.

  1. 15 CFR 917.22 - National Projects funding.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...-effective manner; and (4) the utilization of existing capability and coordination with other relevant projects. Innovation and uniqueness will be significant factors in determining whether to fund a proposed...

  2. 15 CFR 917.22 - National Projects funding.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...-effective manner; and (4) the utilization of existing capability and coordination with other relevant projects. Innovation and uniqueness will be significant factors in determining whether to fund a proposed...

  3. 15 CFR 917.22 - National Projects funding.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...-effective manner; and (4) the utilization of existing capability and coordination with other relevant projects. Innovation and uniqueness will be significant factors in determining whether to fund a proposed...

  4. 15 CFR 917.22 - National Projects funding.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...-effective manner; and (4) the utilization of existing capability and coordination with other relevant projects. Innovation and uniqueness will be significant factors in determining whether to fund a proposed...

  5. 15 CFR 917.22 - National Projects funding.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...-effective manner; and (4) the utilization of existing capability and coordination with other relevant projects. Innovation and uniqueness will be significant factors in determining whether to fund a proposed...

  6. Changes in DSTO Support to Projects Arising From the 6th July 2006 DCIC Decision: Updated Guidance for Project S&T Plans

    DTIC Science & Technology

    2007-02-01

    responsible to the Government for certifying these technical risks [4] and [5] The current funding model for Project S&T Plans is: • Pre-First...the new costing spreadsheets at Annexes C-E. 3.1 A complete set of S&T Activities The 6th July 2006 DCIC decisions to change the funding model increase...changes to the funding model mean that the set of S&T Activities in the Project S&T Plans will need to be categorised in new ways to fit in with the

  7. Emergency contraception in Albania: a multimethods qualitative study of awareness, knowledge, attitudes and practices.

    PubMed

    Doci, Florida; Thaci, Jonida; Foster, Angel M

    2018-04-11

    Contraceptive prevalence is relatively low in Albania, and abortion is the mainstay of family planning. Although levonorgestrel-only emergency contraceptive pills are available, uptake of this method is minimal. Emergency contraception (EC) could play a significant role in addressing women's need for an effective and discreet pregnancy prevention method. However, information about the dynamics surrounding EC is limited. In 2016-2017, we conducted a multimethods qualitative study that aimed to explore awareness, knowledge, attitudes and practices toward EC in Albania. This project comprised four components: a community-based survey with 115 respondents, six focus group discussions with women of reproductive age, 19 semistructured key informant interviews, and 16 structured interviews with retail pharmacists. We analyzed our data using descriptive statistics and for content and themes. Our findings suggest that EC is widely available in pharmacies in Albania. However, a quarter of our survey participants did not know whether EC was available, and more than a third did not think EC was safe to use. Women face numerous barriers to accessing this form of contraception. Misconceptions about hormonal contraceptives, in general, and about progestin-only EC in particular, lack of training among providers, and stigma and fear of judgment were common obstacles identified by participants. Misinformation and lack of knowledge about EC among women and providers in Albania appears common. Training health service providers, raising awareness among women, and developing linguistically and culturally resonant materials for distribution could be keys to improving access to and use of EC. Although the availability of progestin-only EC is widespread in Albania, our findings suggest that more work needs to be done to align national regulatory policies with international standards, facilitate evidence-based service delivery, and increase access to medically accurate information in Albanian. Copyright © 2018 Elsevier Inc. All rights reserved.

  8. Investigating the Temporal Patterns within and between Intrinsic Connectivity Networks under Eyes-Open and Eyes-Closed Resting States: A Dynamical Functional Connectivity Study Based on Phase Synchronization

    PubMed Central

    Wang, Xun-Heng; Li, Lihua; Xu, Tao; Ding, Zhongxiang

    2015-01-01

    The brain active patterns were organized differently under resting states of eyes open (EO) and eyes closed (EC). The altered voxel-wise and regional-wise resting state active patterns under EO/EC were found by static analysis. More importantly, dynamical spontaneous functional connectivity has been observed in the resting brain. To the best of our knowledge, the dynamical mechanisms of intrinsic connectivity networks (ICNs) under EO/EC remain largely unexplored. The goals of this paper were twofold: 1) investigating the dynamical intra-ICN and inter-ICN temporal patterns during resting state; 2) analyzing the altered dynamical temporal patterns of ICNs under EO/EC. To this end, a cohort of healthy subjects with scan conditions of EO/EC were recruited from 1000 Functional Connectomes Project. Through Hilbert transform, time-varying phase synchronization (PS) was applied to evaluate the inter-ICN synchrony. Meanwhile, time-varying amplitude was analyzed as dynamical intra-ICN temporal patterns. The results found six micro-states of inter-ICN synchrony. The medial visual network (MVN) showed decreased intra-ICN amplitude during EC relative to EO. The sensory-motor network (SMN) and auditory network (AN) exhibited enhanced intra-ICN amplitude during EC relative to EO. Altered inter-ICN PS was found between certain ICNs. Particularly, the SMN and AN exhibited enhanced PS to other ICNs during EC relative to EO. In addition, the intra-ICN amplitude might influence the inter-ICN synchrony. Moreover, default mode network (DMN) might play an important role in information processing during EO/EC. Together, the dynamical temporal patterns within and between ICNs were altered during different scan conditions of EO/EC. Overall, the dynamical intra-ICN and inter-ICN temporal patterns could benefit resting state fMRI-related research, and could be potential biomarkers for human functional connectome. PMID:26469182

  9. Water Infrastructure Finance and Innovation Act

    EPA Pesticide Factsheets

    How WIFIA works, program implementation, program guidance, how potential recipients can obtain funding, and project eligibility. WIFIA works with State Revolving Funds to provide subsidized financing for large dollar-value projects.

  10. Gulf Coast Joint Venture - Home

    Science.gov Websites

    Research Resources Data Documents Links Mottled Duck Info Habitat Projects Habitat Funding Contact Us Home - About Us - Planning and Evaluation - Resources - Habitat Projects - Habitat Funding - Contact Us Gulf

  11. 77 FR 69447 - Inland Waterways Users Board

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-19

    ... inland navigation projects and studies and the status of the Inland Waterways Trust Fund, the funding... for 2012 and the project investment recommendations, along with updates of the Inland Marine...

  12. Lessons Learned from FIPSE Projects II.

    ERIC Educational Resources Information Center

    Marcus, Dora; And Others

    This monograph describes 30 college and university programs funded by the Fund for the Improvement of Postsecondary Education from 1989 to 1991. Each description includes information on program purpose, project activities, major insights and lessons, project continuation, and available information. The first group of 10 are programs focused on…

  13. 40 CFR 93.128 - Traffic signal synchronization projects.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Traffic signal synchronization..., Funded or Approved Under Title 23 U.S.C. or the Federal Transit Laws § 93.128 Traffic signal synchronization projects. Traffic signal synchronization projects may be approved, funded, and implemented without...

  14. 40 CFR 93.128 - Traffic signal synchronization projects.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 20 2011-07-01 2011-07-01 false Traffic signal synchronization..., Funded or Approved Under Title 23 U.S.C. or the Federal Transit Laws § 93.128 Traffic signal synchronization projects. Traffic signal synchronization projects may be approved, funded, and implemented without...

  15. 44 CFR 206.204 - Project performance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 44 Emergency Management and Assistance 1 2012-10-01 2011-10-01 true Project performance. 206.204... § 206.204 Project performance. (a) General. This section describes the policies and procedures applicable during the performance of eligible work. (b) Advances of funds. Advances of funds will be made in...

  16. 44 CFR 206.204 - Project performance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false Project performance. 206.204... § 206.204 Project performance. (a) General. This section describes the policies and procedures applicable during the performance of eligible work. (b) Advances of funds. Advances of funds will be made in...

  17. 44 CFR 206.204 - Project performance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 44 Emergency Management and Assistance 1 2014-10-01 2014-10-01 false Project performance. 206.204... § 206.204 Project performance. (a) General. This section describes the policies and procedures applicable during the performance of eligible work. (b) Advances of funds. Advances of funds will be made in...

  18. 40 CFR 93.128 - Traffic signal synchronization projects.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 21 2013-07-01 2013-07-01 false Traffic signal synchronization..., Funded or Approved Under Title 23 U.S.C. or the Federal Transit Laws § 93.128 Traffic signal synchronization projects. Traffic signal synchronization projects may be approved, funded, and implemented without...

  19. 40 CFR 93.128 - Traffic signal synchronization projects.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 21 2012-07-01 2012-07-01 false Traffic signal synchronization..., Funded or Approved Under Title 23 U.S.C. or the Federal Transit Laws § 93.128 Traffic signal synchronization projects. Traffic signal synchronization projects may be approved, funded, and implemented without...

  20. An Evaluation of the Productivity Enhancing Capital Investment Process at the Shore Intermediate Maintenance Activity Little Creek, Virginia.

    DTIC Science & Technology

    1985-12-01

    PECI program sets aside funds in the annual budget and makes them available to managers and personnel for a 10 %[ wide range of cost and labor- saving ... money to fund PECI projects of particular concern to the individual services. [Ref. 4:pp. 3-4] The OSD-sponsored projects include two programs that... money is used by Navy non-industrial funded activities. Although - the line item amount is approved by Congress, individual project approval is the

  1. Notification: Audit of FIFRA and PRIA Funds Management

    EPA Pesticide Factsheets

    Project #OA-FY17-0125, Jan 18, 2017.The EPA OIG plans to begin an audit of the EPA’s funds management of the Pesticides Reregistration and Expedited Processing Fund (aka FIFRA trust fund) and the Pesticide Registration Fund (aka PRIA trust fund).

  2. UK and European Union public and charitable funding from 2008 to 2013 for bacteriology and antibiotic research in the UK: an observational study.

    PubMed

    Bragginton, Eilis C; Piddock, Laura J V

    2014-09-01

    Since the 1990s, the number of new antibacterial drugs has plummeted and the number of antibiotic-resistant infections has risen, which has decreased the effective treatment of many disorders, including sepsis. We aimed to assess whether funding for bacteriology and antibiotic research to UK researchers had increased in response to this global crisis. We systematically searched websites and databases of agencies that fund research in the UK to identify publicly and charitably funded projects from financial years 2008 to 2013 within the specialties of bacteriology and antibiotic research. We created a database to identify the projects funded. Grants awarded in euros were converted to pounds sterling (€1=£0·86). We identified 609 projects within the specialty of bacteriology, 196 (32·2%) of which were on antibiotics. Of £13 846·1 million of available research funding, £269·2 million (1·9%) was awarded to bacteriology projects and £95·0 million (0·7%) was awarded for research on antibiotics. Additionally, £181·4 million in European Union (EU) funding was awarded to antibiotic research consortia including researchers based within the UK, including two EU Innovative Medicines Initiative awards, totalling £85·2 million. To increase awareness of who funds antibiotic research and to facilitate priority setting and funding decisions, funding organisations need to be aware of the breadth and depth of present funding as a baseline by which funding from 2014 onwards can be measured and so that informed decisions about the future level of funding can be made. To resolve the crisis of antibiotic resistance, present levels of funding are inadequate and should be increased substantially. British Society for Antimicrobial Chemotherapy. Copyright © 2014 Elsevier Ltd. All rights reserved.

  3. Ecosystem level methane fluxes from tidal freshwater and brackish marshes of the Mississippi River Delta: Implications for coastal wetland carbon projects

    USGS Publications Warehouse

    Holm, Guerry O.; Perez, Brian C.; McWhorter, David E.; Krauss, Ken W.; Johnson, Darren J.; Raynie, Richard C.; Killebrew, Charles J.

    2016-01-01

    Sulfate from seawater inhibits methane production in tidal wetlands, and by extension, salinity has been used as a general predictor of methane emissions. With the need to reduce methane flux uncertainties from tidal wetlands, eddy covariance (EC) techniques provide an integrated methane budget. The goals of this study were to: 1) establish methane emissions from natural, freshwater and brackish wetlands in Louisiana based on EC; and 2) determine if EC estimates conform to a methane-salinity relationship derived from temperate tidal wetlands with chamber sampling. Annual estimates of methane emissions from this study were 62.3 g CH4/m2/yr and 13.8 g CH4/m2/yr for the freshwater and brackish (8–10 psu) sites, respectively. If it is assumed that long-term, annual soil carbon sequestration rates of natural marshes are ~200 g C/m2/yr (7.3 tCO2e/ha/yr), healthy brackish marshes could be expected to act as a net radiative sink, equivalent to less than one-half the soil carbon accumulation rate after subtracting methane emissions (4.1 tCO2e/ha/yr). Carbon sequestration rates would need case-by-case assessment, but the EC methane emissions estimates in this study conformed well to an existing salinity-methane model that should serve as a basis for establishing emission factors for wetland carbon offset projects.

  4. Large-scale estimates of gross primary production on the Qinghai-Tibet plateau based on remote sensing data

    NASA Astrophysics Data System (ADS)

    Ma, M., II; Yuan, W.; Dong, J.; Zhang, F.; Cai, W.; Li, H.

    2017-12-01

    Vegetation gross primary production (GPP) is an important variable for the carbon cycle on the Qinghai-Tibetan Plateau (QTP). Based on the measurements from twelve eddy covariance (EC) sites, we validated a light use efficiency model (i.e. EC-LUE) to evaluate the spatial-temporal patterns of GPP and the effect of environmental variables on QTP. The EC-LUE model explained 85.4% of the daily observed GPP variations through all of the twelve EC sites, and characterized very well the seasonal changes of GPP. Annual GPP over the entire QTP ranged from 575 to 703 Tg C, and showed a significantly increasing trend from 1982 to 2013. However, there were large spatial heterogeneities in long-term trends of GPP. Throughout the entire QTP, air temperature TA increase had a greater influence than solar radiation and PREC changes on productivity. Moreover, our results highlight the large uncertainties of previous GPP estimates due to insufficient parameterization and validations. When compared with GPP estimates of the EC-LUE model, most Coupled Model Intercomparison Project (CMIP5) GPP products overestimate the magnitude and increasing trends of regional GPP, which potentially impact the feedback of ecosystems to regional climate changes.

  5. LTRC Annual Research Program : Fiscal Year July 1, 2017 - June 30, 2018.

    DOT National Transportation Integrated Search

    2017-06-01

    FHWA Part II SPR Research Program FAP Number SPR-0010(34) & FHWA Funded Research Program & FHWA LTAP Funded Program & FHWA STP Funded Program & Federal & Self-Generated Funded Research Program & Other DOTD Funded Projects

  6. Give-Away Book Programs Combined with Title II Reading Projects. ESEA Title II and The Right to Read, Notable Reading Projects No. 9.

    ERIC Educational Resources Information Center

    Office of Education (DHEW), Washington, DC.

    This is the ninth report describing notable reading projects funded under Title II of the Elementary and Secondary Education Act. Projects combining Title II reading projects with a give-away book program in Alabama, Illinois, Indiana, Maryland, Massachusetts, and New Jersey are described. Although Title II funds cannot be used to provide books to…

  7. Defense Infrastructure: DOD Needs Clearer Guidance on Notifying Congress of Privately Financed Construction Projects

    DTIC Science & Technology

    2017-01-01

    fast food restaurants . Because these projects are not authorized and funded through the regular appropriations process for military construction...750,000 threshold for major projects. 5We selected this sample by identifying one project of each type—commissary; exchange; morale, welfare, and...of 212 possible projects. Further details of our selection process are found in appendix I. Page 3 GAO-17-76 Nonappropriated Fund

  8. "EC to go" takes off at Maryland sites.

    PubMed

    2000-03-01

    Baltimore-based Planned Parenthood of Maryland and the Baltimore City Health Department have joined forces in "EC to Go," which distributes free emergency contraceptive pills (ECPs) through the seven affiliate sites of Planned Parenthood and the three family planning centers of the city. The distribution program was started in October 1999 and funds were provided by an undisclosed area foundation. Although the program is still in its infancy, it has recorded some 800 prescriptions of ECPs in the last fiscal year, and 600 prescriptions have been logged in just the first 6 months of the current fiscal year. To inform the public about the program, Planned Parenthood developed newspaper advertisements, a 60-second radio spot, and coupon distributions, all of which emphasize the fact that emergency contraception is a higher dose of birth control, which can prevent pregnancy if taken within 72 hours of unprotected sex.

  9. 76 FR 67171 - Solia 7 Hydroelectric LLC; Riverbank Hydro No. 20 LLC; Lock Hydro Friends Fund XLIII; FFP Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14163-000; 14174-000; 14181-000; 14195-000] Solia 7 Hydroelectric LLC; Riverbank Hydro No. 20 LLC; Lock Hydro Friends Fund... LLC (Solia), and Riverbank Hydro No. 20 LLC (Riverbank), and on May 3, 2011, Lock Hydro Friends Fund...

  10. 77 FR 13317 - Riverbank Hydro No. 2, LLC, Lock+ Hydro Friends Fund XXXVI, Qualified Hydro 21, LLC; Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14130-000, 14137-000, 14134-000] Riverbank Hydro No. 2, LLC, Lock+ Hydro Friends Fund XXXVI, Qualified Hydro 21, LLC; Notice... drawing, the order of priority is as follows: 1. Lock+ Hydro Friends Fund XXXVI: Project No. 14137-000. 2...

  11. 77 FR 12280 - Riverbank Hydro No. 1, LLC, Lock+ Hydro Friends Fund XXXVII; Qualified Hydro 20, LLC; Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14131-000, 14138-00, 14135-000] Riverbank Hydro No. 1, LLC, Lock+ Hydro Friends Fund XXXVII; Qualified Hydro 20, LLC; Notice..., the order of priority is as follows: 1. Lock+ Hydro Friends Fund XXXVII, Project No. 14138-000. 2...

  12. 25 CFR 170.142 - How can tribes obtain funds to perform highway safety projects?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false How can tribes obtain funds to perform highway safety... WATER INDIAN RESERVATION ROADS PROGRAM Indian Reservation Roads Program Policy and Eligibility Highway Safety Functions § 170.142 How can tribes obtain funds to perform highway safety projects? There are two...

  13. 25 CFR 170.142 - How can tribes obtain funds to perform highway safety projects?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 1 2014-04-01 2014-04-01 false How can tribes obtain funds to perform highway safety... WATER INDIAN RESERVATION ROADS PROGRAM Indian Reservation Roads Program Policy and Eligibility Highway Safety Functions § 170.142 How can tribes obtain funds to perform highway safety projects? There are two...

  14. 25 CFR 170.142 - How can tribes obtain funds to perform highway safety projects?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 1 2012-04-01 2011-04-01 true How can tribes obtain funds to perform highway safety... WATER INDIAN RESERVATION ROADS PROGRAM Indian Reservation Roads Program Policy and Eligibility Highway Safety Functions § 170.142 How can tribes obtain funds to perform highway safety projects? There are two...

  15. Externally Funded Research in Counselor Education: An Overview of the Process

    ERIC Educational Resources Information Center

    Villalba, Jose A.; Young, J. Scott

    2012-01-01

    "Publish or perish" is a phrase familiar to untenured and tenured faculty alike. In recent years, prominence has been placed on academicians to secure external funding for their research and training projects. The counselor education field has not been immune to this call for externally funded projects. This article includes strategies for seeking…

  16. 25 CFR 170.142 - How can tribes obtain funds to perform highway safety projects?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false How can tribes obtain funds to perform highway safety... WATER INDIAN RESERVATION ROADS PROGRAM Indian Reservation Roads Program Policy and Eligibility Highway Safety Functions § 170.142 How can tribes obtain funds to perform highway safety projects? There are two...

  17. 25 CFR 170.142 - How can tribes obtain funds to perform highway safety projects?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false How can tribes obtain funds to perform highway safety... WATER INDIAN RESERVATION ROADS PROGRAM Indian Reservation Roads Program Policy and Eligibility Highway Safety Functions § 170.142 How can tribes obtain funds to perform highway safety projects? There are two...

  18. 76 FR 72449 - Notice of Buy American Waiver Under the American Recovery and Reinvestment Act of 2009

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-23

    ... manufactured goods used in and incorporated into a project funded through the Academic Research Infrastructure... iron, steel, and manufactured goods used in and incorporated into a project funded through the Academic... to be less than 5% of the total Recovery Act funds awarded under the Academic Research Infrastructure...

  19. Exploiting Parallel R in the Cloud with SPRINT

    PubMed Central

    Piotrowski, M.; McGilvary, G.A.; Sloan, T. M.; Mewissen, M.; Lloyd, A.D.; Forster, T.; Mitchell, L.; Ghazal, P.; Hill, J.

    2012-01-01

    Background Advances in DNA Microarray devices and next-generation massively parallel DNA sequencing platforms have led to an exponential growth in data availability but the arising opportunities require adequate computing resources. High Performance Computing (HPC) in the Cloud offers an affordable way of meeting this need. Objectives Bioconductor, a popular tool for high-throughput genomic data analysis, is distributed as add-on modules for the R statistical programming language but R has no native capabilities for exploiting multi-processor architectures. SPRINT is an R package that enables easy access to HPC for genomics researchers. This paper investigates: setting up and running SPRINT-enabled genomic analyses on Amazon’s Elastic Compute Cloud (EC2), the advantages of submitting applications to EC2 from different parts of the world and, if resource underutilization can improve application performance. Methods The SPRINT parallel implementations of correlation, permutation testing, partitioning around medoids and the multi-purpose papply have been benchmarked on data sets of various size on Amazon EC2. Jobs have been submitted from both the UK and Thailand to investigate monetary differences. Results It is possible to obtain good, scalable performance but the level of improvement is dependent upon the nature of algorithm. Resource underutilization can further improve the time to result. End-user’s location impacts on costs due to factors such as local taxation. Conclusions: Although not designed to satisfy HPC requirements, Amazon EC2 and cloud computing in general provides an interesting alternative and provides new possibilities for smaller organisations with limited funds. PMID:23223611

  20. Exploiting parallel R in the cloud with SPRINT.

    PubMed

    Piotrowski, M; McGilvary, G A; Sloan, T M; Mewissen, M; Lloyd, A D; Forster, T; Mitchell, L; Ghazal, P; Hill, J

    2013-01-01

    Advances in DNA Microarray devices and next-generation massively parallel DNA sequencing platforms have led to an exponential growth in data availability but the arising opportunities require adequate computing resources. High Performance Computing (HPC) in the Cloud offers an affordable way of meeting this need. Bioconductor, a popular tool for high-throughput genomic data analysis, is distributed as add-on modules for the R statistical programming language but R has no native capabilities for exploiting multi-processor architectures. SPRINT is an R package that enables easy access to HPC for genomics researchers. This paper investigates: setting up and running SPRINT-enabled genomic analyses on Amazon's Elastic Compute Cloud (EC2), the advantages of submitting applications to EC2 from different parts of the world and, if resource underutilization can improve application performance. The SPRINT parallel implementations of correlation, permutation testing, partitioning around medoids and the multi-purpose papply have been benchmarked on data sets of various size on Amazon EC2. Jobs have been submitted from both the UK and Thailand to investigate monetary differences. It is possible to obtain good, scalable performance but the level of improvement is dependent upon the nature of the algorithm. Resource underutilization can further improve the time to result. End-user's location impacts on costs due to factors such as local taxation. Although not designed to satisfy HPC requirements, Amazon EC2 and cloud computing in general provides an interesting alternative and provides new possibilities for smaller organisations with limited funds.

  1. Teaching is for Kids. 1972 Edition. [A Documentary of Title III, ESEA Projects in Maine.

    ERIC Educational Resources Information Center

    Maine State Dept. of Education, Augusta.

    In this documentary of Title III projects funded under the Elementary and Secondary Education Act, a 2-page descriptive narrative of each of 10 funded projects in Maine is given. Each project is classified by subject matter and is listed under 1 of the following headings: (1) Professional Improvement, (2) Help for the Educationally Disadvantaged,…

  2. Funding and Strategic Alignment Guidance for Infusing Small Business Innovation Research Technology into Aeronautics Research Mission Directorate Projects for 2016

    NASA Technical Reports Server (NTRS)

    Nguyen, Hung D.; Steele, Gynelle C.

    2017-01-01

    This report is intended to help NASA program and project managers incorporate Small Business Innovation Research (SBIR) technologies into NASA Aeronautics Research Mission Directorate (ARMD) projects. Other Government and commercial project managers interested in ARMD funding opportunities through NASA's SBIR program will find this report useful as well.

  3. Special Projects: Meeting Special Needs.

    ERIC Educational Resources Information Center

    Duron, Guillermo, Ed.

    This booklet describes 16 model education projects in Colorado that are funded under the federal Education Consolidation and Improvement Act of 1981 and the Elementary Secondary Education Act of 1978. These programs illustrate how federal funds have had a positive impact on the education of Colorado students. The projects and the cities where they…

  4. 77 FR 47814 - Fremont and Winema Resource Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-10

    ... management projects for funding in FY 2013, under the provisions of Title II of the Secure Rural Schools and... will include a review, and evaluation, of FY 2013 Title II proposals including presentations by project... final recommendations for funding of fiscal year 2013 projects. All Fremont and Winema Resource Advisory...

  5. 7 CFR 4284.908 - Use of grant and matching funds.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... carrying out relevant projects. Matching funds must be provided for the balance of costs. (c) Matching..., or hire a qualified consultant to conduct, a feasibility analysis of the proposed value added project to help determine the potential success of the project; (2) Develop, or hire a qualified consultant...

  6. Learning Design, Social Ontology and Unintended Functionalism in Education Projects

    ERIC Educational Resources Information Center

    Johnson, Mark William

    2016-01-01

    For many years there have been well-funded project opportunities for developing educational innovations, both pedagogical and technological, to fulfil the educational ambitions of national governments and European agencies. Projects have been funded on the basis of competitive bidding against themes identified by funders. Calls for funding…

  7. 7 CFR 1780.48 - Regional commission grants.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... to ARC. RUS Bulletin 1780-23 will be used to develop a separate project management agreement between... Regional commission grants. Grants are sometimes made by regional commissions for projects eligible for RUS...) When RUS has funds in the project, no charge will be made for administering regional commission funds...

  8. 7 CFR 1780.48 - Regional commission grants.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... to ARC. RUS Bulletin 1780-23 will be used to develop a separate project management agreement between... Regional commission grants. Grants are sometimes made by regional commissions for projects eligible for RUS...) When RUS has funds in the project, no charge will be made for administering regional commission funds...

  9. 7 CFR 1780.48 - Regional commission grants.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... to ARC. RUS Bulletin 1780-23 will be used to develop a separate project management agreement between... Regional commission grants. Grants are sometimes made by regional commissions for projects eligible for RUS...) When RUS has funds in the project, no charge will be made for administering regional commission funds...

  10. 7 CFR 1780.48 - Regional commission grants.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... to ARC. RUS Bulletin 1780-23 will be used to develop a separate project management agreement between... Regional commission grants. Grants are sometimes made by regional commissions for projects eligible for RUS...) When RUS has funds in the project, no charge will be made for administering regional commission funds...

  11. Clean Diesel National Grants

    EPA Pesticide Factsheets

    National Funding Assistance Program administers competitive grants for clean diesel projects. The Diesel Emissions Reduction Act (DERA) appropriates funds for these projects. Publication numbers: EPA-420-B-13-025 and EPA-420-P-11-001.

  12. PEER Lifelines Program | PEER Center

    Science.gov Websites

    research projects are organized into eight topics as shown in the following chart. The PEER Lifelines , sources of funding. PEER Lifelines research projects are primarily funded by the following agencies

  13. Nonpoint Source Tribal: Award Projects

    EPA Pesticide Factsheets

    Tribal CWA section 319 funding is awarded via base grants and competitive grants. To learn about current nonpoint source funded work in Indian Country, see the project summary descriptions of recent competitive grant awardees.

  14. Atmospheric Science Program. Summaries of research in FY 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-06-01

    This report provides descriptions for all projects funded by ESD under annual contracts in FY 1994. Each description contains the project`s title; three-year funding history (in thousands of dollars); the contract period over which the funding applies; the name(s) of the principal investigator(s); the institution(s) conducting the projects; and the project`s objectives, products, approach, and results to date (for most projects older than one year). Project descriptions are categorized within the report according to program areas: atmospheric chemistry, atmospheric dynamics, and support operations. Within these categories, the descriptions are ordered alphabetically by principal investigator. Each program area is preceded bymore » a brief text that defines the program area, states it goals and objectives, lists principal research questions, and identifies program managers. Appendixes provide the addresses and telephone numbers of the principal investigators and define the acronyms used.« less

  15. How well do simulated last glacial maximum tropical temperatures constrain equilibrium climate sensitivity?

    NASA Astrophysics Data System (ADS)

    Hopcroft, Peter O.; Valdes, Paul J.

    2015-07-01

    Previous work demonstrated a significant correlation between tropical surface air temperature and equilibrium climate sensitivity (ECS) in PMIP (Paleoclimate Modelling Intercomparison Project) phase 2 model simulations of the last glacial maximum (LGM). This implies that reconstructed LGM cooling in this region could provide information about the climate system ECS value. We analyze results from new simulations of the LGM performed as part of Coupled Model Intercomparison Project (CMIP5) and PMIP phase 3. These results show no consistent relationship between the LGM tropical cooling and ECS. A radiative forcing and feedback analysis shows that a number of factors are responsible for this decoupling, some of which are related to vegetation and aerosol feedbacks. While several of the processes identified are LGM specific and do not impact on elevated CO2 simulations, this analysis demonstrates one area where the newer CMIP5 models behave in a qualitatively different manner compared with the older ensemble. The results imply that so-called Earth System components such as vegetation and aerosols can have a significant impact on the climate response in LGM simulations, and this should be taken into account in future analyses.

  16. Cost-effectiveness analysis of smoking cessation interventions using cell phones in a low-income population.

    PubMed

    Daly, Allan T; Deshmukh, Ashish A; Vidrine, Damon J; Prokhorov, Alexander V; Frank, Summer G; Tahay, Patricia D; Houchen, Maggie E; Cantor, Scott B

    2018-06-09

    The prevalence of cigarette smoking is significantly higher among those living at or below the federal poverty level. Cell phone-based interventions among such populations have the potential to reduce smoking rates and be cost-effective. We performed a cost-effectiveness analysis of three smoking cessation interventions: Standard Care (SC) (brief advice to quit, nicotine replacement therapy and self-help written materials), Enhanced Care (EC) (SC plus cell phone-delivered messaging) and Intensive Care (IC) (EC plus cell phone-delivered counselling). Quit rates were obtained from Project ACTION (Adult smoking Cessation Treatment through Innovative Outreach to Neighborhoods). We evaluated shorter-term outcomes of cost per quit and long-term outcomes using cost per quality-adjusted life year (QALY). For men, EC cost an additional $541 per quit vs SC; however, IC cost an additional $5232 per quit vs EC. For women, EC was weakly dominated by IC-IC cost an additional $1092 per quit vs SC. Similarly, for men, EC had incremental cost-effectiveness ratio (ICER) of $426 per QALY gained vs SC; however, IC resulted in ICER of $4127 per QALY gained vs EC. For women, EC was weakly dominated; the ICER of IC vs SC was $1251 per QALY gained. The ICER was below maximum acceptable willingness-to-pay threshold of $50 000 per QALY under all alternative modelling assumptions. Cell phone interventions for low socioeconomic groups are a cost-effective use of healthcare resources. Intensive Care was the most cost-effective strategy both for men and women. NCT00948129; Results. © Article author(s) (or their employer(s) unless otherwise stated in the text of the article) 2018. All rights reserved. No commercial use is permitted unless otherwise expressly granted.

  17. LTRC Annual Research Program : Fiscal Year July 1, 2012-June 30, 2013

    DOT National Transportation Integrated Search

    2012-06-01

    Contents: Budget Recap Sheets; Project Summary Sheets; FHWA Part II SPR Funded Research Program; FHWA IBRD Funded Research Program; FHWA LTAP Funded Program; FHWA STP Funded Technology Transfer & Education Program; State Funded Research Program; Fede...

  18. LTRC annual research program : fiscal year July 1, 2015 - June 30, 2016.

    DOT National Transportation Integrated Search

    2015-06-01

    Contents: Budget Recap Sheets; Project Summary Sheets; FHWA Part II SPR Funded Research Program; FHWA LTAP Funded Program; FHWA STP Funded Technology Transfer & Education Program; State Funded Research Program; Self-Generated Funded Research; Other D...

  19. LTRC annual research program : fiscal year July 1, 2011-June 30, 2012.

    DOT National Transportation Integrated Search

    2011-06-01

    Contents: Budget Recaps Sheets; Project Summary Sheets; FHWA Part II SPR Funded Research Program; FHWA IBRD Funded Research Program; FHWA LTAP Funded Program; FHWA STP Funded Technology Transfer & Education Program; State Funded Research Program; Sel...

  20. 25 CFR 170.205 - What is an IRR High Priority Project (IRRHPP)?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... RESERVATION ROADS PROGRAM Indian Reservation Roads Program Funding Irr High Priority Project (irrhpp) § 170... applications. (c) IRRHPP funds cannot be used for transportation planning, research, routine maintenance...

  1. Clean Diesel National Grants Awarded

    EPA Pesticide Factsheets

    National Funding Assistance Program administers competitive grants for clean diesel projects. The Diesel Emissions Reduction Act (DERA) appropriates funds for these projects. Publication numbers: EPA-420-B-13-025 and EPA-420-P-11-001.

  2. Enabling Customization through Web Development: An Iterative Study of the Dell Computer Corporation Website

    ERIC Educational Resources Information Center

    Liu, Chang; Mackie, Brian G.

    2008-01-01

    Throughout the last decade, companies have increased their investment in electronic commerce (EC) by developing and implementing Web-based applications on the Internet. This paper describes a class project to develop a customized computer website which is similar to Dell Computer Corporation's (Dell) website. The objective of this project is to…

  3. A closed-loop biorefining system to convert organic residues into fuels

    NASA Astrophysics Data System (ADS)

    Chen, Rui

    This project delivers an energy positive and water neutral, closed-loop biorefining system that converts organic wastes into renewable energy and reduces the overall impacts on the environment. The research consisted of three major stages: The first stage of this project was conducted in an anaerobic co-digestion system. Effects of the ratio of dairy manure-to-food waste as well as operating temperature were tested on the performance of the co-digestion system. Results illustrated an increase in biogas productivity with the increase of supplemental food waste; fiber analysis revealed similar chemical composition (cellulose, hemicellulose and lignin) of final solid digestate regardless their different initial feedstock blends and digestion conditions. The molecular genetic analyses demonstrated that anaerobic methanogenic microorganisms were able to adjust their community assemblage to maximize biogas production and produce homogenized solid digestate. The second stage utilized electrocoagulation (EC) pretreated liquid digestate from previous stage to culture freshwater algae. Kinetics study showed a similar maximum growth rate (0.201-0.207 g TS day-1) in both 2x and 5x dilutions of EC solution; however, the algal growth was inhibited in original EC solution (1x), possibly due to the high ammonia-to-phosphate ratio. Algal community assemblage changed drastically in different dilutions of EC solution after a 9-day culture. The following semi-continuous culture in 2x and 5x EC media established steady biomass productivities and nitrogen removal rates; in addition, both conditions illustrated a phenomenon of phosphorus luxury uptake. Biomass composition analyses showed that algae cultured in medium containing higher nitrogen (2x EC medium) accumulated more protein but less carbohydrate and lipid than the 5x EC medium. The last stage involved hydrolyzing the algal biomass cultured in anaerobic digestion effluent and analyzing the effects of the neutralized algal hydrolysate on the performance of enzymatic hydrolysis of acid or alkali pretreated lignocelluosic substrates (poplar, corn stover, switchgrass, and solid fiber from anaerobic digestion). Results found that algal hydrolysate significantly improved the efficiency of enzymatic hydrolysis of lignin-rich, structurally recalcitrant biomass such as poplar and solid fiber from anaerobic digestion. This discovery broadened the potential application of algal biomass besides direct use for biofuel production.

  4. An Actively Mode-Locked Ho:YAG Solid-Laser Pumped by a Tm-Doped Fiber Laser

    NASA Astrophysics Data System (ADS)

    Bao-Quan, Yao; He, Li; Xiao-Lei, Li; Yi, Chen; Xiao-Ming, Duan; Shuang, Bai; Hong-Yu, Yang; Zheng, Cui; Ying-Jie, Shen; Tong-Yu, Dai

    2016-04-01

    Not Available Supported by the National Natural Science Foundation of China under Grant Nos 61308009 and 61405047, the China Postdoctoral Science Foundation Funded Project under Grant Nos 2013M540288 and 2015M570290, the Fundamental Research Funds for the Central Universities Grant under Grant Nos HIT.NSRIF.2014044 and HIT.NSRIF.2015042, the Science Fund for Outstanding Youths of Heilongjiang Province under Grant No JQ201310, the Heilongjiang Postdoctoral Science Foundation Funded Project under Grant No LBH-Z14085.

  5. Continuous-Wave and Actively Q-Switched Diode-Pumped Er:LuAG Ring Laser at 1650 nm

    NASA Astrophysics Data System (ADS)

    Tong-Yu, Dai; Xu-Guang, Xu; Lin, Ju; Jing, Wu; Zhen-Guo, Zhang; Bao-Quan, Yao; Ye, Zhang

    2016-06-01

    Not Available Supported by the National Natural Science Foundation of China under Grant Nos 61308009 and 61405047, the China Postdoctoral Science Foundation Funded Project under Grant No 2013M540288, the Fundamental Research Funds for the Central Universities under Grant Nos HIT.NSRIF.2014044 and HIT.NSRIF.2015042, the Science Fund for Outstanding Youths of Heilongjiang Province under Grant No JQ201310, and the Heilongjiang Postdoctoral Science Foundation Funded Project under Grant No LBH-Z14085.

  6. Development of a Single-Longitudinal-Mode Ho:YAG Laser Based on Corner Cube

    NASA Astrophysics Data System (ADS)

    Jing, Wu; You-Lun, Ju; Tong-Yu, Dai; Zhen-Guo, Zhang; Bao-Quan, Yao; Yue-Zhu, Wang

    2016-04-01

    Not Available Supported by the National Natural Science Foundation of China under Grant Nos 61308009 and 61405047, the China Postdoctoral Science Foundation Funded Project under Grant No 2013M540288, the Fundamental Research Funds for the Central Universities under Grant Nos HIT.NSRIF.2014044 and HIT.NSRIF.2015042, the Science Fund for Outstanding Youths of Heilongjiang Province under Grant No JQ201310, and the Heilongjiang Postdoctoral Science Foundation Funded Project under Grant No LBH-Z14085.

  7. 34 CFR 694.16 - What are the requirements for redistribution or return of scholarship funds not awarded to a...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... of scholarship funds not awarded to a project's eligible students? 694.16 Section 694.16 Education...) § 694.16 What are the requirements for redistribution or return of scholarship funds not awarded to a project's eligible students? The following requirements apply only to section 404E scholarship awards for...

  8. 34 CFR 694.16 - What are the requirements for redistribution or return of scholarship funds not awarded to a...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... of scholarship funds not awarded to a project's eligible students? 694.16 Section 694.16 Education...) § 694.16 What are the requirements for redistribution or return of scholarship funds not awarded to a project's eligible students? The following requirements apply only to section 404E scholarship awards for...

  9. 34 CFR 694.16 - What are the requirements for redistribution or return of scholarship funds not awarded to a...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... of scholarship funds not awarded to a project's eligible students? 694.16 Section 694.16 Education...) § 694.16 What are the requirements for redistribution or return of scholarship funds not awarded to a project's eligible students? The following requirements apply only to section 404E scholarship awards for...

  10. 34 CFR 694.16 - What are the requirements for redistribution or return of scholarship funds not awarded to a...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... of scholarship funds not awarded to a project's eligible students? 694.16 Section 694.16 Education...) § 694.16 What are the requirements for redistribution or return of scholarship funds not awarded to a project's eligible students? The following requirements apply only to section 404E scholarship awards for...

  11. 76 FR 4892 - Lock+ Hydro Friends Fund XXXIX, FFP Missouri 3, LLC, Allegheny 3 Hydro, LLC, Three Rivers Hydro...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-27

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 13740-000, 13749-000, 13775-000, 13781-000] Lock+ Hydro Friends Fund XXXIX, FFP Missouri 3, LLC, Allegheny 3 Hydro, LLC, Three..., Pennsylvania.\\1\\ The applications were filed by Lock+ Hydro Friends Fund XXXIX, for Project No. 13740-000, FFP...

  12. 76 FR 67169 - Solia 9 Hydroelectric LLC Riverbank Hydro No. 17 LLC Lock Hydro Friends Fund XLI FFP Project 54...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14162-000; 14173-000; 14182-000; 14192-000] Solia 9 Hydroelectric LLC Riverbank Hydro No. 17 LLC Lock Hydro Friends Fund XLI... LLC (Solia), and Riverbank Hydro No. 17 LLC (Riverbank), and on May 3, 2011, Lock Hydro Friends Fund...

  13. 76 FR 67172 - Riverbank Hydro No. 8 LLC Lock Hydro Friends Fund XLIV FFP Project 51 LLC; Notice of Competing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [14160-000; 14179-000; 14194-000] Riverbank Hydro No. 8 LLC Lock Hydro Friends Fund XLIV FFP Project 51 LLC; Notice of Competing Preliminary... Applications On May 2, 2011, Riverbank Hydro No. 8 LLC (Riverbank), and on May 3, 2011, Lock Hydro Friends Fund...

  14. An Industrial-Based Consortium to Develop Premium Carbon Products from Coal, Annual Progress Report, October 1, 2005 through September 30, 2006

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miller, Bruce G

    2006-09-29

    Since 1998, The Pennsylvania State University has been successfully managing the Consortium for Premium Carbon Products from Coal (CPCPC), which is a vehicle for industry-driven research on the promotion, development, and transfer of innovative technology on premium carbon produces from coal to the U.S. industry. The CPCPC is an initiative being led by Penn State, its co-charter member West Virginia University (WVU), and the U.S. Department of Energy's (DOE) National Energy Technology Laboratory (NETL), who also provides the base funding for the program, with Penn State responsible for consortium management. CPCPC began in 1998 under DOE Cooperative Agreement No. DE-FC26-98FT40350.more » This agreement ended November 2004 but the CPCPC activity has continued under the present cooperative agreement, No. DE-FC26-03NT41874, which started October 1, 2003. The objective of the second agreement is to continue the successful operation of the CPCPC. The CPCPC has enjoyed tremendous success with its organizational structure, that includes Penn State and WVU as charter members, numerous industrial affiliate members, and strategic university affiliate members together with NETL, forming a vibrant and creative team for innovative research in the area of transforming coal to carbon products. The key aspect of CPCPC is its industry-led council that selects proposals submitted by CPCPC members to ensure CPCPC target areas have strong industrial support. Base funding for the selected projects is provided by NETL with matching funds from industry. At the annual funding meeting held in October 2003, ten projects were selected for funding. Subcontracts were let from Penn State to the subcontractors on March 1, 2004. Nine of the ten 2004 projects were completed during the previous annual reporting period and their final reports were submitted with the previous annual report (i.e., 10/01/04-09/30/05). The final report for the remaining project, which was submitted during this reporting period (i.e., 10/01/05-09/30/06), is attached. At the annual funding meeting held in November 2004, eleven projects were selected for funding. Subcontracts were let from Penn State to the subcontractors on March 1, 2005. Three additional projects were selected for funding during the April 2005 tutorial/funding meeting. Subcontracts were let from Penn State to the subcontractors on July 1, 2005. Of these fourteen 2005 projects, eleven have been completed and the final reports are attached. An annual funding meeting was held in November 2005 and the council selected five projects for funding. Subcontracts were let from Penn State to the subcontractors on March 1, 2006, except for one that started October 1, 2006.« less

  15. Public funding for research on antibacterial resistance in the JPIAMR countries, the European Commission, and related European Union agencies: a systematic observational analysis

    PubMed Central

    Kelly, Ruth; Zoubiane, Ghada; Walsh, Desmond; Ward, Rebecca; Goossens, Herman

    2016-01-01

    Summary Background Antibacterial resistant infections are rising continuously, resulting in increased morbidity and mortality worldwide. With no new antibiotic classes entering the market and the possibility of returning to the pre-antibiotic era, the Joint Programming Initiative on Antimicrobial Resistance (JPIAMR) was established to address this problem. We aimed to quantify the scale and scope of publicly funded antibacterial resistance research across JPIAMR countries and at the European Union (EU) level to identify gaps and future opportunities. Methods We did a systematic observational analysis examining antibacterial resistance research funding. Databases of funding organisations across 19 countries and at EU level were systematically searched for publicly funded antibacterial resistance research from Jan 1, 2007, to Dec 31, 2013. We categorised studies on the basis of the JPIAMR strategic research agenda's six priority topics (therapeutics, diagnostics, surveillance, transmission, environment, and interventions) and did an observational analysis. Only research funded by public funding bodies was collected and no private organisations were contacted for their investments. Projects in basic, applied, and clinical research, including epidemiological, public health, and veterinary research and trials were identified using keyword searches by organisations, and inclusion criteria were based on the JPIAMR strategic research agenda's six priority topics, using project titles and abstracts as filters. Findings We identified 1243 antibacterial resistance research projects, with a total public investment of €1·3 billion across 19 countries and at EU level, including public investment in the Innovative Medicines Initiative. Of the total amount invested in antibacterial resistance research across the time period, €646·6 million (49·5%) was invested at the national level and €659·2 million (50·5%) at the EU level. When projects were classified under the six priority topics we found that 763 (63%) of 1208 projects funded at national level were within the area of therapeutics, versus 185 (15%) in transmission, 131 (11%) in diagnostics, 53 (4%) in interventions, and only 37 (3%) in environment and 39 (3%) in surveillance. Interpretation This was the first systematic analysis of research funding of antibacterial resistance of this scale and scope, which relied on the availability and accuracy of data from organisations included. Large variation was seen between countries both in terms of number of projects and associated investment and across the six priority topics. To determine the future direction of JPIAMR countries a clear picture of the funding landscape across Europe and Canada is needed. Countries should work together to increase the effect of research funding by strengthening national and international coordination and collaborations, harmonising research activities, and collectively pooling resources to fund multidisciplinary projects. The JPIAMR have developed a publicly available database to document the antibacterial resistance research collected and can be used as a baseline to analyse funding from 2014 onwards. Funding JPIAMR and the European Commission. PMID:26708524

  16. Project CHECO Southeast Asia Report. Igloo White (Initial Phase)

    DTIC Science & Technology

    1968-07-31

    sensors--had to be developed, tested, and produced in quantity. A wing of EC-121 aircraft had to be deployed to Korat RTAFB, Thailand, to provide orbital...Location (Thailand) 653d Recon Wg 21 EC-121 Korat 1st Air Commando Wg 19 Al-E Nakhon Phanom 21st Helicopter Sq 12 CH-3E Nakhon Phanom 23d Tac Air Spt Sq...tinual orbits over the sensor fields. These aircraft based at Korat , m normally flew in orbit for eight hours, or until relieved by a replacement

  17. Clean Diesel National Grants Awarded 2008-2011

    EPA Pesticide Factsheets

    National Funding Assistance Program administers competitive grants for clean diesel projects. The Diesel Emissions Reduction Act (DERA) appropriates funds for these projects. Publication numbers: EPA-420-B-13-025 and EPA-420-P-11-001.

  18. SF Bay Water Quality Improvement Fund: Projects and Accomplishments

    EPA Pesticide Factsheets

    San Francisco Bay Water Quality Improvement Fund (SFBWQIF) projects listed here are part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources.

  19. 75 FR 44053 - Proposed Collection; Comment Request: CDFI/CDE Project Profiles Web Form

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-27

    ...; Comment Request: CDFI/CDE Project Profiles Web Form ACTION: Notice and request for comments. SUMMARY: The... the Treasury, is soliciting comments concerning the CDFI/CDE Project Profile Web Form, a voluntary... CIIS. The CDFI Fund plans to use the descriptions in CDFI Fund publications, on its Web site and in...

  20. 34 CFR 380.5 - What activities may the Secretary fund under community-based supported employment projects?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... development, including work site modification and use of advanced learning technology for skills training. (3...-based supported employment projects? 380.5 Section 380.5 Education Regulations of the Offices of the... the Secretary fund under community-based supported employment projects? (a) Authorized activities. The...

Top