Science.gov

Sample records for edison company plant

  1. 76 FR 29744 - Monongahela Power Company, West Penn Power Company, The Potomac Edison Company, PJM...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-23

    ... Edison Company, PJM Interconnection, L.L.C.; Notice of Filing Take notice that on May 13, 2011, Monongahela Power Company, West Penn Power Company, The Potomac Edison Company (collectively, the...

  2. 76 FR 70437 - Southern California Edison Company; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-14

    ... Energy Regulatory Commission Southern California Edison Company; Notice of Filing Take notice that on September 26, 2011, Southern California Edison Company filed its compliance filing, pursuant to the Federal...).\\1\\ \\1\\ Southern California Edison Company, Order on Waiver Request 136 FERC ] 61,133 (2011)....

  3. 75 FR 15748 - Detroit Edison Company; Fermi 2; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-30

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Detroit Edison Company; Fermi 2; Exemption 1.0 Background Detroit Edison Company (the licensee) is... five requirements specified in Enclosure 1 of the Detroit Edison letter dated December 23, 2009,...

  4. 75 FR 48323 - Southern California Edison Company; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-10

    ... Energy Regulatory Commission Southern California Edison Company; Notice of Filing August 4, 2010. Take...) December 17, 2009 Order on Petition for Declaratory Order, Southern California Edison Co., 129 FERC ] 61,246 (2009) (December 17, Order), Southern California Edison Company filed a compliance...

  5. 75 FR 81316 - Detroit Edison Company; FERMI 2; Environmental Assessment and Finding of No Significant Impact

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-27

    ... the Final Environmental Statement for the Enrico Fermi Atomic Power Plant, Unit 2, NUREG-0769, dated... COMMISSION Detroit Edison Company; FERMI 2; Environmental Assessment and Finding of No Significant Impact The... Edison Company (the licensee), for operation of Fermi 2, located in Monroe County, Michigan....

  6. 77 FR 5787 - Consumers Energy Company, Detroit Edison Company; Notice of Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-06

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Consumers Energy Company, Detroit Edison Company; Notice of Application...: Consumers Energy Company & Detroit Edison Company. e. Name of Projects: Ludington Pumped Storage....

  7. 76 FR 1197 - Detroit Edison Company, FERMI 2; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-07

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Detroit Edison Company, FERMI 2; Exemption 1.0 Background Detroit Edison Company (DECo) (the licensee) is the holder of Facility Operating License No. NFP-43 which authorizes operation of the Fermi...

  8. 25. Historic American Buildings Survey. Detroit Edison Company, Photographer. Gift ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    25. Historic American Buildings Survey. Detroit Edison Company, Photographer. Gift of Emil Lorch, AIA (1951) CHAMFERED WOODEN POST, CORBEL, BEAM AND FLOOR JOISTS - Detroit & Cleveland Navigation Company Warehouse, Wayne Street, Detroit, MI

  9. 15. Historic American Buildings Survey. Detroit Edison Company, Photographer. Gift ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Historic American Buildings Survey. Detroit Edison Company, Photographer. Gift of Emil Lorch, AIA (1951) LATER IRON COLUMN AND STAIRS, OFFICE SECTION - Detroit & Cleveland Navigation Company Warehouse, Wayne Street, Detroit, MI

  10. 76 FR 40721 - Southern California Edison Company; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-11

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Southern California Edison Company; Notice of Filing Take notice that on... Regulatory Commission (FERC or the Commission), 18 CFR 385.207 (2011), Southern California Edison...

  11. 76 FR 21735 - Solutions for Utilities, Inc.v. Pacific Gas and Electric Company, Southern California Edison...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-18

    ... California Edison Company, San Diego Gas & Electric Company, California Public Utilities Commission; Notice... Pacific Gas and Electric Company (PG&E), Southern California Edison Company (SCE), San Diego...

  12. 78 FR 41395 - Southern California Edison Company; Notice of Availability of Final Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-10

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Southern California Edison Company; Notice of Availability of Final... environmental assessment (EA) for an application filed by Southern California Edison Company (licensee)...

  13. 78 FR 25076 - Southern California Edison Company; Notice of Availability of Draft Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-29

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Southern California Edison Company; Notice of Availability of Draft... environmental assessment (EA) for an application filed by Southern California Edison Company (licensee)...

  14. 75 FR 49929 - Southern California Edison Company; Notice of Petition for Declaratory Order

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-16

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Southern California Edison Company; Notice of Petition for Declaratory Order... California Edison Company (SCE) filed a Petition for Declaratory Order for Incentive Rate...

  15. Demonstration of natural gas reburn for NO{sub x} emissions reduction at Ohio Edison Company`s cyclone-fired Niles Plant Unit Number 1

    SciTech Connect

    Borio, R.W.; Lewis, R.D.; Koucky, R.W.; Lookman, A.A.; Manos, M.G.; Corfman, D.W.; Waddingham, A.L.; Johnson, S.A.

    1996-04-01

    Electric utility power plants account for about one-third of the NO{sub x} and two-thirds of the SO{sub 2} emissions in the US cyclone-fired boilers, while representing about 9% of the US coal-fired generating capacity, emit about 14% of the NO{sub x} produced by coal-fired utility boilers. Given this background, the Environmental Protection Agency, the Gas Research Institute, the Electric Power Research Institute, the Pittsburgh Energy Technology Center, and the Ohio Coal Development Office sponsored a program led by ABB Combustion Engineering, Inc. (ABB-CE) to demonstrate reburning on a cyclone-fired boiler. Ohio Edison provided Unit No. 1 at their Niles Station for the reburn demonstration along with financial assistance. The Niles Unit No. 1 reburn system was started up in September 1990. This reburn program was the first full-scale reburn system demonstration in the US. This report describes work performed during the program. The work included a review of reburn technology, aerodynamic flow model testing of reburn system design concepts, design and construction of the reburn system, parametric performance testing, long-term load dispatch testing, and boiler tube wall thickness monitoring. The report also contains a description of the Niles No. 1 host unit, a discussion of conclusions and recommendations derived from the program, tabulation of data from parametric and long-term tests, and appendices which contain additional tabulated test results.

  16. 77 FR 65909 - Southern California Edison Company; Establishment of Atomic Safety and Licensing Board

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-31

    ... COMMISSION Southern California Edison Company; Establishment of Atomic Safety and Licensing Board Pursuant to... California Edison Company (San Onofre Nuclear Generating Station, Units 2 and 3) This proceeding involves a license amendment request by Southern California Edison Company to convert ] the Current...

  17. 76 FR 57029 - Southern California Edison Company; Notice of Application for Amendment of License and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-15

    ... Energy Regulatory Commission Southern California Edison Company; Notice of Application for Amendment of.... Project No.: 67-126. c. Date Filed: August 8, 2011. d. Applicant: Southern California Edison Company. e.... Michael Murphy, Southern California Edison Company, P.O. Box 100, Big Creek, California 93605, Tel:...

  18. 75 FR 28604 - Southern California Edison Company; Pacific Gas and Electric Company; San Diego Gas & Electric...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-21

    ... Energy Regulatory Commission Southern California Edison Company; Pacific Gas and Electric Company; San Diego Gas & Electric Company; Notice of Petition for Declaratory Order May 13, 2010. Take notice that on... and Electric Company, and San Diego Gas & Electric Company filed a Petition for Declaratory...

  19. 76 FR 6836 - Southern California Edison Company; Notice of Withdrawal of Application for Amendments to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-08

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Southern California Edison Company; Notice of Withdrawal of Application for Amendments to Facility... Southern California Edison (SCE, the licensee) to withdraw its January 14, 2010, application for...

  20. 75 FR 81265 - Southern California Edison Company; Notice of Petition for Declaratory Order

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-27

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Southern California Edison Company; Notice of Petition for Declaratory Order December 17, 2010. Take notice that on December 9, 2010, Southern California Edison Company (SCE),...

  1. Performance of the Southern California Edison Company Stirling dish

    SciTech Connect

    Lopez, C.W.; Stone, K.W.

    1993-10-01

    McDonnell Douglas Astronautics Company (MDAC) and United Stirling AB of Sweden (USAB) formed a joint venture in 1982 to develop and produce a Stirling dish solar generating system. In this report, the six year development and testing program continued by the Southern California Edison Company (SCE) is described. Each Stirling dish module consists of a sun tracking dish concentrator developed by the MDAC and a Stirling engine driven power conversion unit (PCU) developed by USAB. The Stirling dish system demonstrated twice the peak and daily solar-to-electric conversion efficiency of any other system then under development. This system continues to set the performance standard for solar to electric systems being developed in the early 1990`s. Test data are presented and used to estimate the performance of a commercial system.

  2. 63. Photocopy of photograph, no date. MAP OF POTOMAC EDISON ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    63. Photocopy of photograph, no date. MAP OF POTOMAC EDISON COMPANY SYSTEM. (Courtesy of the Potomac Edison Company Library (Hagerstown, MD), Historical Data Files - Dam No. 5 Hydroelectric Plant, On Potomac River, Hedgesville, Berkeley County, WV

  3. 75 FR 10836 - Firstenergy Nuclear Operating Company, Firstenergy Nuclear Generation Corp., Ohio Edison Company...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-09

    ..., the Toledo Edison Company, Beaver Valley Power Station, Unit Nos. 1 And 2; Exemption 1.0 Background... and NPF-73, which authorizes operation of the Beaver Valley Power Station, Unit Nos. 1 and 2 (BVPS-1.... The facility consists of two pressurized-water reactors located in Beaver County, Pennsylvania....

  4. 75 FR 11946 - Detroit Edison Company; FERMI 2; Environmental Assessment and Finding of No Significant Impact

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-12

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Detroit Edison Company; FERMI 2; Environmental Assessment and Finding of No Significant Impact The...,'' for Facility Operating License No. NPF-43, issued to Detroit Edison Co. (DECO) (the licensee),...

  5. 75 FR 6736 - FirstEnergy Nuclear Operating Company, FirstEnergy Nuclear Generation Corp., Ohio Edison Company...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-10

    ..., the Toledo Edison Company, Beaver Valley Power Station, Unit Nos. 1 and 2; Environmental Assessment...-73, issued to FirstEnergy Nuclear Operating Company (licensee), for operation of the Beaver Valley... Beaver Valley Power Station, Units 1 and 2, Supplement 36, Final Report'' (NUREG-1437). Agencies...

  6. 76 FR 32238 - Detroit Edison Company, Fermi 2; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-03

    ... of the U.S. Nuclear Regulatory Commission (NRC, the Commission) now or hereafter in effect. The... 10 of the Code of Federal Regulations (10 CFR) part 73, ``Physical protection of plants and materials,'' Section 73.55, ``Requirements for physical protection of licensed activities in nuclear power...

  7. 76 FR 42725 - Notice of Availability of the Record of Decision for the Southern California Edison Company...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-19

    ... Edison Company Devers-Palo Verde No. 2 Transmission Line Project, California AGENCY: Bureau of Land... Decision (ROD) for the Devers-Palo Verde No. 2 Transmission Line Project located in southern California... the Harquahala generating station switchyard, located near the Palo Verde Nuclear Generating...

  8. 78 FR 3470 - DTE Electric Company (Formerly the Detroit Edison Company), Notice of Availability of Final...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-16

    ... Environmental Impact Statement for a Combined License for Unit 3 at the Enrico Fermi Atomic Power Plant Site... Combined License (COL) for Enrico Fermi Unit 3.'' The site is located in Monroe County, Michigan. The... online at the NRC's Fermi Unit 3--specific Web page at...

  9. Edison vs. Tesla

    ScienceCinema

    Hogan, Kathleen; Wallace, Hal; Ivestor, Rob

    2016-07-12

    As Edison vs. Tesla week heats up at the Energy Department, we are exploring the rivalry between Thomas Edison and Nikola Tesla and how their work is still impacting the way we use energy today. Whether you're on Team Tesla or Team Edison, both inventors were key players in creating things like batteries, power plants and wireless technologies -- all innovations we still use today. And as we move toward a clean energy future, energy efficient lighting, like LED bulbs, and more efficient electric motors not only help us save money on electricity costs but help combat climate change. For this, Tesla and Edison both deserve our recognition.

  10. Edison vs. Tesla

    SciTech Connect

    Hogan, Kathleen; Wallace, Hal; Ivestor, Rob

    2013-11-20

    As Edison vs. Tesla week heats up at the Energy Department, we are exploring the rivalry between Thomas Edison and Nikola Tesla and how their work is still impacting the way we use energy today. Whether you're on Team Tesla or Team Edison, both inventors were key players in creating things like batteries, power plants and wireless technologies -- all innovations we still use today. And as we move toward a clean energy future, energy efficient lighting, like LED bulbs, and more efficient electric motors not only help us save money on electricity costs but help combat climate change. For this, Tesla and Edison both deserve our recognition.

  11. Scrutinizing Edison.

    ERIC Educational Resources Information Center

    Saks, Judith Brody

    1995-01-01

    Describes the arrangements in Mount Clemens, Michigan, and Boston, Massachusetts, with the Edison Project. In this public-private partnership, Edison will be responsible for curriculum, facilities management, professional development, personnel, and food service. Cites other school districts considering having Edison schools. A sidebar summarizes…

  12. Illuminating Systems: Edison and Electrical Incandescence.

    ERIC Educational Resources Information Center

    Sanford, Greg

    1989-01-01

    Traces the life and inventions of Thomas A. Edison up to the invention of electrical incandescent lighting in 1881. Focuses on the process that Edison followed in developing incandescent lighting, including financial aspects, other competitors in the field, and the eventual establishment of the Edison Electric Light Companies. (RW)

  13. Outages of electric power supply resulting from cable failures Boston Edison Company system

    SciTech Connect

    1980-07-01

    Factual data are provided regarding 5 electric power supply interruptions that occurred in the Boston Metropolitan area during April to June, 1979. Common to all of these outages was the failure of an underground cable as the initiating event, followed by multiple equipment failures. There was significant variation in the voltage ratings and types of cables which failed. The investigation was unable to delineate a single specific Boston Edison design operating or maintenance practice that could be cited as the cause of the outages. After reviewing the investigative report the following actions were recommended: the development and implementation of a plan to eliminate the direct current cable network; develop a network outage restoration plan; regroup primary feeder cables wherever possible to minimize the number of circuits in manholes, and to separate feeders to high load density areas; develop a program to detect incipient cable faults; evaluate the separation of the north and south sections of Back Bay network into separate networks; and, as a minimum, install the necessary facilities to make it possible to re-energize one section without interfering with the other; and re-evaluate the cathodic protection scheme where necessary. (LCL)

  14. 75 FR 70220 - Southern California Edison Company; Notice of Application Accepted for Filing, Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-17

    ... Company, 300 N. Lone Hill Ave., San Dimas, CA 91773, (909) 394-8714. i. FERC Contact: Mr. Jeremy Jessup, (202) 502-6779, Jeremy.Jessup@ferc.gov . ] j. Deadline for filing comments, motions to intervene, and... solely for water conveyance purposes. l. Locations of the Application: A copy of the application...

  15. 75 FR 12580 - Southern California Edison Company, San Onofre Nuclear Generating Station, Units 2 and 3...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-16

    ... CFR Part 73, does not involve any physical changes to the reactor, fuel, plant structures, support structures, water, or land at the SONGS 2 and 3 site. The proposed action is in accordance with the...

  16. 75 FR 66744 - Californians for Renewable Energy, Inc. (CARE) v. Pacific Gas and Electric Company, Southern...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-29

    ... Company, Southern California Edison Company, San Diego Gas & Electric Company, California Public Utilities... California Edison Company, San Diego Gas & Electric Company, and the California Public Utilities...

  17. 75 FR 54618 - CAlifornians for Renewable Energy, Inc. (CARE) v. Pacific Gas and Electric Company, Southern...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-08

    ... Company, Southern California Edison Company, San Diego Gas & Electric Company, California Public Utilities..., Southern California Edison Company, San Diego Gas & Electric Company, and the California Public...

  18. 76 FR 66998 - Detroit Edison Company; Notice of Availability of Draft Environmental Impact Statement for a...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-28

    ... Combined License for Unit 3 at the Enrico Fermi Atomic Power Plant Site Notice is hereby given that the U.S... published NUREG-2105, ``Draft Environmental Impact Statement for the Combined License (COL) for Enrico Fermi... the NRC's Fermi Unit 3 specific Web page at...

  19. 76 FR 56820 - Detroit Edison Company, Fermi 2; Environmental Assessment and Finding of No Significant Impact

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-14

    ... safety of ERO personnel when responding to the site due to the increase in population and redistribution... the plant was first licensed. Additional delays may occur in the future based on continued population growth. Improvements have been made to equipment, procedures, and training since initial approval of...

  20. Room used at one point by Charles Edison, the inventor's ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Room used at one point by Charles Edison, the inventor's son, as his office while president of the Edison companies in the 1930s. The large metal tanks to the right are part of a modern halon gas fire suppression system for the building. - Thomas A. Edison Laboratories, Building No. 5, Main Street & Lakeside Avenue, West Orange, Essex County, NJ

  1. Health Hazard Evaluation Report HETA 81-369-1591, HETA 81-466-1591, Electric Machinery - McGraw Edison Company, Minneapolis, Minnesota

    SciTech Connect

    Stephenson, R.L.; Murphy, D.C.; Habes, D.J.

    1985-04-01

    Environmental and breathing zone samples were analyzed for amines, aliphatic aldehydes, boron-trifluoride-monoethylamine, epichlorohydrin, total volatile fluorides, formaldehyde, lead, methyl- tetrahydrophthalic-anhydride, and n-butyl-glycidyl-ether at Electric Machinery/McGraw Edison Company, Minneapolis, Minnesota in December, 1981 and February, 1983. The surveys were requested by the union local because of irritative symptoms and respiratory problems reported by employees exposed to epoxy resin compounds and impregnated materials. The authors conclude that mucous membrane irritation and dermatitis are common among workers exposed to epoxy resins. A high prevalence of carpal tunnel syndrome was also found. Recommendations include reducing formaldehyde concentrations, using personal protective equipment and barrier creams, and maintaining proper work practices and good personal hygiene to minimize contact with epoxy resin materials.

  2. Development of high temperature, corrosion resistant polymer concrete for use in the steam distribution system of the Consolidated Edison Company of New York. Final report

    SciTech Connect

    Webster, R.P.; Kukacka, L.E.; Reams, W.; Miller, C.A.

    1994-11-01

    The results of a research program conducted by Brookhaven National Laboratory (BNL) to evaluate and develop polymer concrete (PC) materials, which can be used as an alternative material of construction to conventional steel-reinforced portland cement concrete (PCC) within the steam distribution system of Consolidated Edison Company of New York (Con Ed), are presented. Three fiber-reinforced PC systems were identified and evaluated in a series of laboratory and in situ field tests. Based upon the results of these tests preliminary design studies were performed by BNL and the Con Ed Civil Design Division to determine the necessary floor slab, wall and roof thicknesses required to replace a typical steel reinforced PCC manhole with a fiber-reinforced PC manhole.

  3. Detroit Edison conquers zebra mussels

    SciTech Connect

    Harwood, D.B.; Buda, D.J. )

    1993-11-01

    A potentially troublesome zebra mussel infestation at Detroit Edison's Harbor Beach Power Plant was nipped in time. Reducing the oxygen content of water inside the plant's water systems and using steam to thermally treat a colony of mussels that was established in the plant's screenhouse prevented the problem. So successful was the temperature treatment that it will be used regularly as part of the plant's annual mussel removal program.

  4. Characterization of steam cycle chemistry at Southern California Edison steam plants. Final report

    SciTech Connect

    Auerswald, D.C.; Cutler, F.M.

    1985-05-01

    Corrosion problems in the low pressure (LP) turbines and reheat sections of fossil-fueled supercritical units triggered power industry concern over the levels and transport of trace impurities in steam cycle systems. Surveys of a number of Southern California Edison (SCE) generating units were conducted to provide a data base for determining the differences between the steam produced in drum-type and once-through units. Ion chromatography, flame emission spectroscopy and flameless atomic absorption were used to detect and identify the corrodents present in the various operating units. The most severe corrosion attack on LP turbine blades was observed on once-through units that operated condensate polishers past ammonium breakthrough. The LP turbines of drum-type units were found to be in better shape than any of the once-through unit turbines. It was determined that operation of condensate polishers beyond ammonium breakthrough was responsible for the high levels of chloride found in the steam of once-through units. Modifications of the regeneration procedure for condensate polishers at SCE resulted in more than a ten-fold reduction in chloride leakage. Further modifications of the regeneration procedure provided for polisher operation beyond ammonium breakthrough with less than 1 ppB leakage of chloride, sulfate or sodium. Based upon the correlation observed between steam chemistry and turbine blade condition, stringent chemical limits are recommended. An extensive evaluation of the Dionex ion chromatograph system for trace analysis of sodium, calcium, magnesium, fluoride, chloride and sulfate is presented. Procedures developed for sub-ppB analysis of fluoride, chloride and sulfate and various tests to determine resin condition and degree of regeneration are outlined. 11 refs., 41 figs., 71 tabs.

  5. Management of Southern California Edison`s NOx reduction program in a changing regulatory environment

    SciTech Connect

    Estrada, J.C.; Hoffman, D.R.; Johnson, L.W.; Kimoto, E.M.; Petrucelli, A.; Zamorano, D.

    1995-12-31

    The Southern California Edison Company (Edison) is a privately owned electric utility serving customers in a twelve county area of Southern California. Beginning in 1989, Edison initiated a major effort, within the Los Angeles air quality basin, to significantly reduce generating station emissions of the oxides of nitrogen (NOx). Since this program began, there have been numerous changes to the local, state and regional air quality regulations under which Edison operates. As a result, the program has evolved and expanded to include most of the fossil fuel generating units within the Edison service territory. Edison has attempted to meet these regulatory changes in the most cost effective manner. Using a variety of NOx control mechanisms, implemented throughout the period, Edison has taken a flexible approach to incorporating the latest technological developments. At the same time, lessons learned during each phase have been factored into succeeding phases of the program. Now that most of the NOx control devices have been installed and several years of operating experience have been gained, Edison would like to share that experience so that others might gain additional knowledge which may help in their NOx control programs. The major areas which will be addressed include (1) new developments, (2) contracting strategy, (3) project management and (4) an overview of operating experiences and results with Urea Injection (SNCR), Low NOx Burners (LNB), Flue Gas Recirculation and Selective Catalytic Reduction (SCR) systems.

  6. A 180-MWe British Gas/Lurgi-based IGCC (integrated gasification combined-cycle) power plant: Feasibility study at Virginia Power and Detroit Edison: Final report

    SciTech Connect

    Booras, G.S.; Pietruszkiewicz, J.; Sibley, F.O.

    1988-09-01

    This study investigated the merits of combining the British Gas/Lurgi slagging gasifier (BGL gasifier) with an advanced gas turbine in a 180-MWe, commercial-scale IGCC power plant located at Virginia Power's Chesterfield station. The gasification plant was fed with run-of-mine Pittsburgh No. 8 coal (containing 60 percent fines) and sized to fully load one General Electric MS7001F gas turbine at 88/degree/F ambient temperature. Seventy-five percent of the total coal fines were pelletized by agglomeration prior to gasification. All recovered tars and oils were recycled to the gasifier, while the gas liquor (process wastewater) is completely incinerated. The results of the study indicate that the IGCC power plant has a very good heat rate on coal (8993 Btu/kWh at 59/degree/F and a moderate capital cost, i.e., total capital requirement, on coal ($1910/kW at 59/degree/F, with AFDC) for a commercial-scale plant in this size range. With distillate augmentation to the medium-Btu fuel gas at 59/degree/F, the capital cost drops to about $1770/kW (with AFDC). A sensitivity study compared the cost and performance of a similar IGCC power plant located at an alternate plant site owned by Detroit Edison. The capital cost for the Detroit Edison plant increased by about $200/kW, with a very slight improvement in heat rate. 16 figs., 59 tabs.

  7. 76 FR 77855 - Detroit Edison Company; Notice of Availability of Errata Sheet for the Draft Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-14

    ... Statement for a Combined License for Unit 3 at the Enrico Fermi Atomic Power Plant Site Notice is hereby... the Combined License (COL) for Enrico Fermi Unit 3.'' The site is located in Monroe County, Michigan... (Deficit) in 2025 (5370) Generating Capacity Needs (D - A). F Fermi 3 Net Generating Capacity. 1535...

  8. Review of consolidated Edison`s integrated resource bidding program

    SciTech Connect

    Goldman, C.A.; Busch, J.F.; Kahn, E.P.; Baldick, R.; Milne, A.

    1993-07-01

    Competitive bidding has emerged as the dominant method for procuring new resources by US utilities. In New York, the Public Service Commission (NYPSC) ordered the state`s seven investor-owned utilities to develop bidding programs to acquire supply and DSM resource options. Utilities were allowed significant discretion in program design in order to encourage experimentation. Competitive bidding programs pose formidable policy, design, and management challenges for utilities and their regulators. Yet, there have been few detailed case studies of bidding programs, particularly of those utilities that take on the additional challenge of having supply and DSM resources compete head-to-head for a designated block of capacity. To address that need, the New York State Energy Research and Development Authority (NYSERDA), the New York Department of Public Service, and the Department of Energy`s Integrated Resource Planning program asked Lawrence Berkeley Laboratory (LBL) to review the bidding programs of two utilities that tested the integrated ``all-sources`` approach. This study focuses primarily on Consolidated Edison Company of New York`s (Con Edison) bidding program; an earlier report discusses our review of Niagara Mohawk`s program (Goldman et al 1992). We reviewed relevant Commission decisions, utility filings and signed contracts, interviewed utility and regulatory staff, surveyed DSM bidders and a selected sample of DSM non-bidders, and analyzed the bid evaluation system used in ranking bids based on detailed scoring information on individual bids provided by Con Edison.

  9. Bringing Edison to Light.

    ERIC Educational Resources Information Center

    Barbato, Joseph

    1979-01-01

    The papers of Thomas A. Edison will be compiled and published in a 20-year project under the sponsorship of the National Park Service, the New Jersey Historical Commission, the Smithsonian Institution, and Rutgers University. This effort, the Thomas A. Edison Papers Project, and its background are described. (JMD)

  10. Edison's vacuum technology patents

    NASA Astrophysics Data System (ADS)

    Waits, Robert K.

    2003-07-01

    During 1879 Thomas Edison's Menlo Park, New Jersey laboratory developed the means to evacuate glass lamp globes to less than a mTorr in 20 min and in mid-1880 began production of carbon-filament incandescent lamps. Among Edison's nearly 1100 U.S. patents are five for vacuum pump improvements, and at least eight others that are vacuum-related; all applied for between 1880 and 1886. Inspired by an 1878 article by De La Rue and Müller [Philos. Trans. R. Soc. London, Ser. A 169, 155 (1878)] on studies of glow discharges, Edison devised a combination pump using the Geissler pump as a rough pump and the Sprengel pump for continuous exhaustion. Edison's patents described means to control the mercury flow and automate the delivery of the mercury to banks of up to a hundred pumps. Other patents described various means to remove residual gases during lamp processing.

  11. Southern California Edison PDF

    EPA Pesticide Factsheets

    This Southern California Edison report describes an evaluation of SCE’s Retail Appliance Recycling Program (Retail ARP) trial that was initiated in late October 2010 and completed in September of 2011.

  12. Practicing like Thomas Edison.

    PubMed

    Baum, Neil; Ornstein, Hal

    2013-01-01

    For many centuries, medicine has practiced in a vacuum, and the healthcare profession has been isolated from other scientific disciplines. Beginning in the 20th century, doctors and scientists have looked to others for ideas, suggestions, innovations, and new technologies. Probably no one in the past hundred years has done so much to change the world than Thomas Edison. This article will discuss eight principles of Edison and how they may apply to our profession and our practices.

  13. 78 FR 69661 - Michael Canales v. Edison International, EIX, Southern California Edison; Notice of Complaint

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-20

    ... Energy Regulatory Commission Michael Canales v. Edison International, EIX, Southern California Edison....1, Michael Canales (Complainant) filed a formal complaint against Edison International, EIX and Southern California Edison (collectively, Respondents), alleging that the Respondents' actions, as...

  14. Happy Birthday, Thomas Edison!

    ERIC Educational Resources Information Center

    Dalton, Edward A.

    1997-01-01

    Discusses the work and inventions of Thomas Edison and their use in making teachers and students aware of the importance of electrotechnology in their lives and in their futures. Enables students to learn about science, experimentation, research, the process of invention, and the thrill of discovery. Describes educational resources available from…

  15. Edison Comes to Town.

    ERIC Educational Resources Information Center

    McCord, Robert S.

    2001-01-01

    The Clark County Nevada Board of Trustees voted unanimously in April, 2001 to approve a 5-year, more than $35 million contract with Edison Schools to run seven of the district's lowest-achieving schools. Describes the decision process and reports what the board and the superintendent learned. One of their biggest lessons was the importance of…

  16. 1. NORTH IDAHO PHOSPHATE COMPANY PLANTS. VIEW IS TO THE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. NORTH IDAHO PHOSPHATE COMPANY PLANTS. VIEW IS TO THE NORTHEAST, WITH THE SHIPPING AND STORAGE WAREHOUSE, AMMONIUM PHOSPHATE FERTILIZER PLANT, AND PHOSPHORIC ACID PLANT APPEARING IN SUCCESSION DOWN GOVERNMENT GULCH. - North Idaho Phosphate Company, Silver King Community, Kellogg, Shoshone County, ID

  17. PREFACE: Edison 16

    NASA Astrophysics Data System (ADS)

    Varani, Luca; Palermo, Christophe; Bastard, Gérald

    2009-11-01

    Conference logo On behalf of the organizing committee we welcome all participants to the 16th International Conference on Electron Dynamics In Semiconductors, Optoelectronics and Nanostructures (EDISON). Since the first meeting, organized in 1973 in Modena (Italy), this international conference has been regularly organized mostly each two years, and after 28 years EDISON is back to Montpellier for its 16th edition. This conference was previously known as 'Hot Carriers In Semiconductors' (HCIS). For some years the name was changed into 'Nonequilibrium Carrier Dynamics in Semiconductors' (keeping the acronym HCIS). Then, during the last meeting of the international advisory committee in Tokyo, the decision was taken to find a new denomination that should be more adapted to the latest evolutions in the domains covered by the conference. After several discussions and a vote within the committee, the new acronym of EDISON was chosen. Therefore EDISON 16 can be considered as the last of a long series of conferences and, at the same time, the first of a new cycle of conferences. The primary focus of EDISON is to provide an international meeting place to discuss the latest progress in the field of nonequilibrium classical and quantum carrier dynamics, from semiconductor bulk materials up to advanced structures and nanometric devices. This includes: classical incoherent transport, as well as coherent transport, usually analyzed by means of ultrafast electrical and optical excitations. To accompany the newest developments, TeraHertz phenomena, with a special attention to quantum cascade lasers, have been added to the list of topics. More recently new subjects have been included such as spintronics, transport in organic materials, graphene and carbon nanotubes. This list of topics is regularly modified and updated at each edition of the conference to represent but also anticipate the latest scientific evolutions. The distinctive features of EDISON are: A long-lasting history

  18. Inspiration, Perspiration, and Time: Operations and Achievement in Edison Schools

    ERIC Educational Resources Information Center

    Gill, Brian P.; Hamilton, Laura S.; Lockwood, J. R.; Marsh, Julie A.; Zimmer, Ron W.; Hill, Deanna; Pribesh, Shana

    2005-01-01

    New forms of governing and managing public schools have proliferated in recent years, spawning the establishment and growth of companies that operate public schools under contract. Among these education management organizations, or EMOs, the largest and most visible is Edison Schools, Inc., with a nationwide network in 2004-2005 of 103 managed…

  19. OUT Success Stories: Solar Trough Power Plants

    DOE R&D Accomplishments Database

    Jones, J.

    2000-08-01

    The Solar Electric Generating System (SEGS) plants use parabolic-trough solar collectors to capture the sun's energy and convert it to heat. The SEGS plants range in capacity from 13.8 to 80 MW, and they were constructed to meet Southern California Edison Company's periods of peak power demand.

  20. OUT Success Stories: Solar Trough Power Plants

    SciTech Connect

    Jones, J.

    2000-08-05

    The Solar Electric Generating System (SEGS) plants use parabolic-trough solar collectors to capture the sun's energy and convert it to heat. The SEGS plants range in capacity from 13.8 to 80 MW, and they were constructed to meet Southern California Edison Company's periods of peak power demand.

  1. 77 FR 49463 - Southern California Edison, San Onofre Nuclear Generating Station, Units 2 and 3; Application and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-16

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Southern California Edison, San Onofre Nuclear Generating Station, Units 2 and 3; Application and... Edison Company (SCE, the licensee) for operation of the San Onofre Nuclear Generating Station...

  2. 72. SOUTH PLANT SHELL OIL COMPANY COMPLEX, FROM CHEMICAL STORAGE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    72. SOUTH PLANT SHELL OIL COMPANY COMPLEX, FROM CHEMICAL STORAGE TANK. VIEW TO WEST. - Rocky Mountain Arsenal, Bounded by Ninety-sixth Avenue & Fifty-sixth Avenue, Buckley Road, Quebec Street & Colorado Highway 2, Commerce City, Adams County, CO

  3. 8. SOUTH PLANT SHELL OIL COMPANY FACILITIES, WITH PIPELINE PEDESTALS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. SOUTH PLANT SHELL OIL COMPANY FACILITIES, WITH PIPELINE PEDESTALS IN FOREGROUND. VIEW TO SOUTHWEST. - Rocky Mountain Arsenal, Bounded by Ninety-sixth Avenue & Fifty-sixth Avenue, Buckley Road, Quebec Street & Colorado Highway 2, Commerce City, Adams County, CO

  4. Energy Star program benefits Con Edison

    SciTech Connect

    1995-05-01

    Impressed with savings in energy costs achieved after upgrading the lighting and air conditioning systems at its Manhattan headquarters, Home Box Office (HBO) wanted to do more, James Flock, vice president for computer and office systems, contacted Con Edison Co. of New York in March 1991 to determine what the company could do to save money by reducing energy consumed by personal computers. Arthur Kressner, Con Edison Research and Development manager contacted industry organizations and manufacturers for advice, but was told only to shut off computers at night and on weekends. Kressner arranged a series of meetings with IBM and the Electric Power Research Institute (EPRI) to discuss the issue, then approached the U.S. Environmental Protection Agency (EPA), which was designing a program to promote the introduction and use of energy-efficient office equipment. In 1992, the EPA announced the Energy Star program for PCs, enabling manufacturers to display the Energy Star logo on machines meeting program criteria, including the ability to enter a sleep mode in which neither the computer nor monitor consume more than 30 W or electricity. Industry experts estimate national energy consumption by office equipment could double by the year 2000, but Energy Star equipment is expected to improve efficiency and help maintain electric loads.

  5. Commonwealth Edison Company pressure locking test report

    SciTech Connect

    Bunte, B.D.; Kelly, J.F.

    1996-12-01

    Pressure Locking is a phenomena which can cause the unseating thrust for a gate valve to increase dramatically from its typical static unseating thrust. This can result in the valve actuator having insufficient capability to open the valve. In addition, this can result in valve damage in cases where the actuator capability exceeds the valve structural limits. For these reasons, a proper understanding of the conditions which may cause pressure locking and thermal binding, as well as a methodology for predicting the unseating thrust for a pressure locked or thermally bound valve, are necessary. This report discusses the primary mechanisms which cause pressure locking. These include sudden depressurization of piping adjacent to the valve and pressurization of fluid trapped in the valve bonnet due to heat transfer. This report provides a methodology for calculating the unseating thrust for a valve which is pressure locked. This report provides test data which demonstrates the accuracy of the calculation methodology.

  6. 126. JOB NO. X98396, PLANT LAYOUT, FORD MOTOR COMPANY LONG ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    126. JOB NO. X9-8396, PLANT LAYOUT, FORD MOTOR COMPANY LONG BEACH ASSEMBLY PLANT, MARCH 1940. - Ford Motor Company Long Beach Assembly Plant, Assembly Building, 700 Henry Ford Avenue, Long Beach, Los Angeles County, CA

  7. Edison Home Community Study Unit.

    ERIC Educational Resources Information Center

    Lee County School District, Ft. Myers, FL. Dept. of Environmental Education and Instructional Development Services.

    History is not merely events that occurred in the past. The past has influenced the present, as the present will influence the future. The purpose of this community study unit is to provide fourth grade students with an opportunity to investigate some of the history of Lee County, Florida. The unit's focus is on Thomas Edison, who built a home in…

  8. 12. SOUTH PLANT FROM SHELL OIL COMPANY CHEMICAL STORAGE TANK, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. SOUTH PLANT FROM SHELL OIL COMPANY CHEMICAL STORAGE TANK, SHOWING FACILITIES MAINTENANCE BUILDING (543) AT LEFT AND WHITE PHOSPHOROUS FILLING BUILDING (541) AND WAREHOUSE (542) AT CENTER. VIEW TO SOUTHWEST. - Rocky Mountain Arsenal, Bounded by Ninety-sixth Avenue & Fifty-sixth Avenue, Buckley Road, Quebec Street & Colorado Highway 2, Commerce City, Adams County, CO

  9. 73. DETAIL OF SOUTH PLANT SHELL OIL COMPANY COMPLEX FROM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    73. DETAIL OF SOUTH PLANT SHELL OIL COMPANY COMPLEX FROM CHEMICAL STORAGE TANK. VIEW TO WEST. - Rocky Mountain Arsenal, Bounded by Ninety-sixth Avenue & Fifty-sixth Avenue, Buckley Road, Quebec Street & Colorado Highway 2, Commerce City, Adams County, CO

  10. Edison Demonstration of Smallsat Networks

    NASA Technical Reports Server (NTRS)

    Westley, Deborah; Martinez, Andres; Petro, Andrew

    2015-01-01

    The goal of NASA's Edison Demonstration of Smallsat Networks (EDSN) mission is to demonstrate interactive satellite swarms capable of collecting, exchanging and transmitting multi-point scientific measurements. Satellite swarms enable a wide array of scientific, commercial and academic research not achievable with a single satellite. The EDSN satellites are scheduled to be launched into space as secondary payloads on the first flight of the Super Strypi launch vehicle no earlier than Oct. 29, 2015.

  11. New Jersey's Thomas Edison and the fluoroscope.

    PubMed

    Tselos, G D

    1995-11-01

    Thomas Edison played a major role in the development of early x-ray technology in 1896, notably increasing tube power and reliability and making the fluoroscope a practical instrument. Eventually, Edison would move x-ray technology from the laboratory to the marketplace.

  12. A Model Technology Educator: Thomas A. Edison

    ERIC Educational Resources Information Center

    Pretzer, William S.; Rogers, George E.; Bush, Jeffery

    2007-01-01

    Reflecting back over a century ago to the small village of Menlo Park, New Jersey provides insight into a remarkable visionary and an exceptional role model for today's problem-solving and design-focused technology educator: Thomas A. Edison, inventor, innovator, and model technology educator. Since Edison could not simply apply existing knowledge…

  13. 75 FR 14638 - FirstEnergy Nuclear Operating Company; Perry Nuclear Power Plant; Environmental Assessment and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-26

    ... COMMISSION FirstEnergy Nuclear Operating Company; Perry Nuclear Power Plant; Environmental Assessment and...Energy Nuclear Operating Company (FENOC, the licensee), for operation of the Perry Nuclear Power Plant... Manager, Plant Licensing Branch III-2, Division of Operating Reactor Licensing, Office of Nuclear...

  14. 77 FR 51071 - Indiana Michigan Power Company, Donald C. Cook Nuclear Plant, Unit 2, Environmental Assessment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-23

    ... COMMISSION Indiana Michigan Power Company, Donald C. Cook Nuclear Plant, Unit 2, Environmental Assessment and... Indiana Michigan Power Company (the licensee), for operation of Donald C. Cook Nuclear Plant, Unit 2 (CNP... not change normal plant operating conditions (i.e., no changes are expected in the fuel...

  15. 76 FR 41530 - Connecticut Yankee Atomic Power Company, Haddam Neck Plant; Notice of Consideration of Approval...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-14

    ... COMMISSION Connecticut Yankee Atomic Power Company, Haddam Neck Plant; Notice of Consideration of Approval of... Facility Operating License No. DPR-61 for the Haddam Neck Plant, currently held by Connecticut Yankee Atomic Power Company (CYAPCO), as owner and licensed operator of the Haddam Neck Plant. According to...

  16. The Edison Environmental Center Permeable Pavement Site

    EPA Science Inventory

    This a presentation for a Community Outreach Event called "Chemistry Works and Celebration of International Year of Chemistry." It will review the permeable pavement research project at the Edison Environmental center.

  17. Rival Centennial Casts New Light on Edison.

    ERIC Educational Resources Information Center

    Broad, William J.

    1979-01-01

    Discusses how the celebration of the centennial of the electric lamp raises the claim of the supporters of Sir Joseph Swan in England that Swan not Edison was the first inventor of the light bulb. (HM)

  18. Permeable Pavement Research - Edison, New Jersey

    EPA Science Inventory

    This presentation provides the background and summary of results collected at the permeable pavement parking lot monitored at the EPA facility in Edison, NJ. This parking lot is surfaced with permeable interlocking concrete pavers (PICP), pervious concrete, and porous asphalt. ...

  19. Technical evaluation of the susceptibility of safety-related systems to flooding caused by the failure of non-category 1 systems for the San Onofre Nuclear Power Plant, Unit 1

    SciTech Connect

    Latorre, V.R.; Victor, R.A.

    1980-11-01

    This report documents the technical evaluation of Southern California Edison Company's San Onofre Nuclear Power Plant, Unit 1, to determine whether the failure of any non-Category 1 (seismic) equipment could result in a condition, such as flooding, that might potentially adversely affect the performance of safety-related equipment required for the safe shutdown of the facility or to mitigate the consequences of an accident. Criteria developed by the US Nuclear Regulatory Commission were used to evaluate the acceptability of the existing protection as well as measures taken by Southern California Edison Company to minimize the danger of flooding and to protect safety-related equipment.

  20. 76 FR 34105 - Carolina Power & Light Company, Brunswick Steam Electric Plant Units 1 and 2; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-10

    ... COMMISSION Carolina Power & Light Company, Brunswick Steam Electric Plant Units 1 and 2; Exemption 1.0 Background Carolina Power & Light Company, et al. (the licensee), is the holder of Facility Operating License... Carolina Power & Light Company an exemption from the requirements of 10 CFR 26.205(c) and (d) for...

  1. 75 FR 11937 - General Motors Company, Lordstown Stamping Plant, Warren, OH; Notice of Termination of Investigation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-12

    ... Employment and Training Administration General Motors Company, Lordstown Stamping Plant, Warren, OH; Notice... workers of General Motors Company, Lordstown Stamping Plant, Warren, Ohio. The petitioning group of... terminated. Signed in Washington, DC, this 29th day of January 2010. Elliott S. Kushner, Certifying...

  2. 78 FR 42556 - Maine Yankee Atomic Power Company; Maine Yankee Atomic Power Plant Issuance of Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-16

    ... COMMISSION Maine Yankee Atomic Power Company; Maine Yankee Atomic Power Plant Issuance of Environmental..., 2011, with various implementation dates for each of the rule changes. Maine Yankee Atomic Power Company (MYAPC) is holder of Facility Operating License DPR-36 for the Maine Yankee Atomic Power Plant (MY)....

  3. Large loudspeaker horns and crated Edison radios from 1929 are ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Large loudspeaker horns and crated Edison radios from 1929 are stored in a side room on the third floor. - Thomas A. Edison Laboratories, Building No. 5, Main Street & Lakeside Avenue, West Orange, Essex County, NJ

  4. Boards at background, left are displays of parts for Edison ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Boards at background, left are displays of parts for Edison phonographs which were used in management of production and sales promotions. - Thomas A. Edison Laboratories, Building No. 5, Main Street & Lakeside Avenue, West Orange, Essex County, NJ

  5. Biofouling monitoring and control program at the Boston Edison Pilgrim Nuclear Station: A twelve year history

    SciTech Connect

    McDonald, D.J.; Armstrong, W.J.; Carucci, C.A.

    1996-08-01

    This paper reviews the history of the Biofouling Monitoring and Control Program at the Boston Edison Company Pilgrim Nuclear Power Station. The program was initially developed in 1982 in response to serious operations, maintenance and performance related problems due to biofouling in both the circulating and service water systems. Although implemented seven years prior to federal mandates under GL 89-13, this program also satisfies regulatory criteria for biofouling monitoring and control of nuclear service water systems. Since its inception, the impact of macrofouling on plant operation and availability has been significantly reduced. Stringent monitoring for blue mussels, installation of mechanical barriers to horseshoe crabs, improvements in screens, screenwash and debris removal systems, and an on-going commitment to biofouling control have reduced the number of condenser backwashes per year from > 40 (1989) to < 10. Depending on conditions and timing of a backwash, the resulting economic gain from this improvement alone can be 1.5 to more than 4 million dollars a year. Other improvements in related components and the service water system have also resulted in reduced maintenance related problems and an additional cost benefit to the plant. 13 refs., 6 figs., 1 tab.

  6. Status of warm dielectric cable installation at Detroit Edison

    NASA Astrophysics Data System (ADS)

    Spreafico, S.; Bechis, M.; Caracino, P.; Cavalleri, G.; Coletta, G.; Corsaro, P.; Ladiè, P.; Nassi, M.; Kelley, N.

    2002-08-01

    In response to the combined effects of growing energy demand and the impact of de-regulation of the electrical energy industry, pro-active utilities are ensuring flexibility and robustness of their networks, by upgrading or installed capacity in both transmission and distribution. In this regard, high-temperature superconducting (HTS) cable systems offer advantages where space, thermal capability and environmental conditions constrain capacity. To facilitate the transition of HTS cable technology from the laboratory to the field, Pirelli Cables and Systems, EPRI, Detroit Edison, a DTE Energy Company, ASC, and the US DOE have undertaken a program which will result in the demonstration of a HTS power cable to deliver electricity in a utility network. This program will demonstrate a retrofit upgrade application of the Warm Dielectric HTS cable design in the Detroit Edison utility network, and involve the design, engineering, installation, test and routine operation of a 24-kV, 100 MVA, 3-phase cable system. The original circuit, comprised of three parallel circuits of conventional cables, will be replaced by a single circuit of HTS cables which will provide the same power capacity. Each HTS cable will carry 2400 A RMS, a level triple the capacity of original cables powering this circuit. This paper addresses the issues relating to the field application of HTS cables in the context of the demonstration program.

  7. Edison upright phonographs are stored throughout the third floor; shown ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Edison upright phonographs are stored throughout the third floor; shown here are also storage cabinets containing parts for 1929 Edison radios. Cabinets also contain partial experimental apparatus from other parts of the laboratory. - Thomas A. Edison Laboratories, Building No. 5, Main Street & Lakeside Avenue, West Orange, Essex County, NJ

  8. 'Music Room,' third floor, is used for storage of Edison ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    'Music Room,' third floor, is used for storage of Edison phonographs; this room was used during the 1920s to audition recording artists and to listen to prospective pieces of music for release on Edison records. - Thomas A. Edison Laboratories, Building No. 5, Main Street & Lakeside Avenue, West Orange, Essex County, NJ

  9. Human-factors control-room-design review draft audit report: Detroit Edison Company, Enrico Fermi Atomic Power Plant--Unit 2

    SciTech Connect

    Savage, J.W.

    1981-08-12

    A human factors audit of the Fermi-2 control room was conducted April 27 through May 1, 1981. This report contains the audit team findings, organized according to the draft NUREG-0700 guidelines sections. The discrepancies identified during the audit are categorized according to their severity and the required schedule for their resolution.

  10. DEMONSTRATION OF NATURAL GAS REBURN FOR NOX EMISSIONS REDUCTION AT OHIO EDISON COMPANY'S CYCLONE-FIRED NILES PLANT UNIT NO. 1

    EPA Science Inventory

    The report describes a demonstration of reburning on a cyclone-fired boiler. The project included a review of reburn technology, aerodynamic flow model testing, long-term load dispatch testing, and boiler tube wall thickness monitoring. The report also contains a description of O...

  11. Permeable pavement research – Edison, New Jersey

    EPA Science Inventory

    These are the slides for the New York City Concrete Promotional Council Pervious Concrete Seminar presentation. The basis for the project, the monitoring design and some preliminary monitoring data from the permeable pavement parking lot at the Edison Environmental Center are pre...

  12. Edison Offers Degrees but No Classes

    ERIC Educational Resources Information Center

    Wald, Matthew L.

    1977-01-01

    Thomas A. Edison College, New Jersey's ninth state college, has awarded associate or bachelor's degrees to more than a thousand students for work completed at other colleges or for knowledge gained on the job or through independent study. It has no faculty, no library and a small office building for a campus--here its evaluation criteria are…

  13. 75 FR 3942 - Carolina Power & Light Company Shearon Harris Nuclear Power Plant, Unit 1 Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-25

    ... COMMISSION Carolina Power & Light Company Shearon Harris Nuclear Power Plant, Unit 1 Environmental Assessment...), for operation of the Shearon Harris Nuclear Power Plant, Unit 1 (HNP), located in New Hill, North... Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Shearon Harris Nuclear......

  14. 75 FR 77919 - Carolina Power & Light Company Shearon Harris Nuclear Power Plant, Unit 1; Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-14

    ... COMMISSION Carolina Power & Light Company Shearon Harris Nuclear Power Plant, Unit 1; Environmental... Progress Energy Carolinas, Inc., for operation of the Shearon Harris Nuclear Power Plant (HNP), Unit 1...: Regarding Shearon Harris Nuclear Power Plant, Unit 1--Final Report (NUREG-1437, Supplement 33).''...

  15. 75 FR 16524 - FirstEnergy Nuclear Operating Company, Perry Nuclear Power Plant; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-01

    ... COMMISSION FirstEnergy Nuclear Operating Company, Perry Nuclear Power Plant; Exemption 1.0 Background FirstEnergy Nuclear Operating Company (FENOC, the licensee) is the holder of Facility Operating License No... compliance date (Reference: June 4, 2009, letter from R. W. Borchardt, NRC, to M. S. Fertel, Nuclear...

  16. 76 FR 77563 - Florida Power & Light Company; St. Lucie Plant, Unit No. 1; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-13

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Florida Power & Light Company; St. Lucie Plant, Unit No. 1; Exemption 1.0 Background The Florida Power & Light Company (FPL, the licensee) is the holder of Renewed Facility Operating License No....

  17. 75 FR 16871 - Carolina Power & Light Company, Brunswick Steam Electric Plant, Units 1 and 2; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-02

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Carolina Power & Light Company, Brunswick Steam Electric Plant, Units 1 and 2; Exemption 1.0 Background Carolina Power & Light Company (CP&L, the licensee) is the holder of Facility Operating...

  18. 75 FR 9958 - Carolina Power & Light Company, Shearon Harris Nuclear Power Plant, Unit 1; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-04

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Carolina Power & Light Company, Shearon Harris Nuclear Power Plant, Unit 1; Exemption 1.0 Background Carolina Power & Light Company (the licensee), now doing business as Progress Energy...

  19. 76 FR 68512 - Carolina Power & Light Company; H. B. Robinson Steam Electric Plant, Unit 2; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-04

    ... COMMISSION Carolina Power & Light Company; H. B. Robinson Steam Electric Plant, Unit 2; Exemption 1.0 Background Carolina Power & Light Company (the licensee) is the holder of Renewed Facility Operating License... cooling systems for light- water nuclear power reactors,'' paragraph (a)(1)(i) provides requirements...

  20. 77 FR 26793 - Florida Power and Light Company, St. Lucie Plant, Unit No. 2, Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-07

    ... From the Federal Register Online via the Government Publishing Office ] NUCLEAR REGULATORY COMMISSION Florida Power and Light Company, St. Lucie Plant, Unit No. 2, Exemption 1.0 Background The Florida Power & Light Company (FPL, the licensee) is the holder of Renewed Facility Operating License No....

  1. 77 FR 13156 - Carolina Power & Light Company; Shearon Harris Nuclear Power Plant, Unit 1; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-05

    ... COMMISSION Carolina Power & Light Company; Shearon Harris Nuclear Power Plant, Unit 1; Exemption 1.0 Background Carolina Power & Light Company, the licensee, doing business as Progress Energy Carolinas Inc., is...) 50.46, ``Acceptance criteria for emergency core cooling systems for light- water nuclear...

  2. 75 FR 80547 - Carolina Power & Light Company, Shearon Harris Nuclear Power Plant, Unit No. 1; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-22

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Carolina Power & Light Company, Shearon Harris Nuclear Power Plant, Unit No. 1; Exemption 1.0 Background Carolina Power & Light Company (CP&L, the licensee) is the holder of Renewed Facility...

  3. Fantasy Seed Company: A Role Playing Game for Plant Breeding Courses

    ERIC Educational Resources Information Center

    Hague, Steve S.

    2011-01-01

    Understanding plant breeding as well as procedures and issues of seed companies are skills students studying agronomy need to acquire. Simulation games can be effective teaching tools in developing higher-order thinking skills of students. The "Fantasy Seed Company" game was developed to create motivated learners by allowing students to run a mock…

  4. 78 FR 26401 - Connecticut Yankee Atomic Power Company, Haddam Neck Plant, Environmental Assessment and Finding...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-06

    ... COMMISSION Connecticut Yankee Atomic Power Company, Haddam Neck Plant, Environmental Assessment and Finding.... On June 20, 2012, Connecticut Yankee Atomic Power Company (CYAPCO) submitted a letter, ``Request for... structure in place prior to the issuance of the EP Final Rule and, therefore, does not propose any...

  5. Synthetic Minor NSR Permit: Red Cedar Gathering Company - Arkansas Loop and Simpson Treating Plants

    EPA Pesticide Factsheets

    This page contains the response to public comments and the final synthetic minor NSR permit for the Red Cedar Gathering Company, Arkansas Loop and Simpson Treating Plants, located on the Southern Ute Indian Reservation in La Plata County, CO.

  6. 75 FR 6224 - Northern States Power Company of Minnesota; Monticello Nuclear Generating Plant Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-08

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Northern States Power Company of Minnesota; Monticello Nuclear Generating Plant Environmental Assessment and Finding of No Significant Impact The U.S. Nuclear Regulatory Commission (NRC) is...

  7. Lehigh Southwest Cement Company: Compressed Air System Improvement Saves Energy

    SciTech Connect

    2003-10-01

    In 2001, Lehigh Southwest Cement Company improved the compressed air system at its cement plant in Tehachapi, California. Consequently, the system was able to operate more efficiently with less compressor capacity and at a lower system pressure. The project yielded total annual savings of 895,000 kWh and $199,000. The initial project cost was $417,000, but Southern California Edison provided a $90,000 incentive payment to reduce the cost to $327,000. Simple payback was about 20 months.

  8. The impact of electric vehicles on the Southern California Edison System

    SciTech Connect

    Ford, A.

    1992-07-01

    This report describes the results of the first phase of an investigation of the impacts of electric vehicles (EVs) in southern California. The investigation focuses on the Southern California Edison Company (SCE) which provides electric service for approximately 60% of southern California. The project is supported by the Air Quality Impacts of Energy Efficiency'' Program of the California Institute for Energy Efficiency (CIEE). The first phase of the research is organized around how EVs might be viewed by customers, vehicle manufacturers and electric utility companies. The vehicle manufacturers' view has been studied with special emphasis on the role of marketable permit systems. The utilities' view of EVs is the subject of this report. The review is particularly important as several case studies of EVs in southern California have been conducted in recent years. The dynamics of a growing population of EVs is explained. Chapter 5 explains a simple method of deriving the electricity demands which could result from the operation of EVs in southern California. The method is demonstrated for several simple examples and then used to find the demands associated with each of the eight EV scenarios. Chapter 6 reports the impacts on SCE operations from the new demands for electricity. Impacts are summarized in terms of system operating costs, reliability of service, and changes in the utility's average electric rate. Chapter 7 turns to the emissions of air pollutants released by the operation of EVs, conventional vehicles (CVs) and power plants. Chapter 8 takes the air pollution analysis one step further by examining the possible reduction in ambient ozone concentration in southern California.

  9. The impact of electric vehicles on the Southern California Edison System. Final report

    SciTech Connect

    Ford, A.

    1992-07-01

    This report describes the results of the first phase of an investigation of the impacts of electric vehicles (EVs) in southern California. The investigation focuses on the Southern California Edison Company (SCE) which provides electric service for approximately 60% of southern California. The project is supported by the ``Air Quality Impacts of Energy Efficiency`` Program of the California Institute for Energy Efficiency (CIEE). The first phase of the research is organized around how EVs might be viewed by customers, vehicle manufacturers and electric utility companies. The vehicle manufacturers` view has been studied with special emphasis on the role of marketable permit systems. The utilities` view of EVs is the subject of this report. The review is particularly important as several case studies of EVs in southern California have been conducted in recent years. The dynamics of a growing population of EVs is explained. Chapter 5 explains a simple method of deriving the electricity demands which could result from the operation of EVs in southern California. The method is demonstrated for several simple examples and then used to find the demands associated with each of the eight EV scenarios. Chapter 6 reports the impacts on SCE operations from the new demands for electricity. Impacts are summarized in terms of system operating costs, reliability of service, and changes in the utility`s average electric rate. Chapter 7 turns to the emissions of air pollutants released by the operation of EVs, conventional vehicles (CVs) and power plants. Chapter 8 takes the air pollution analysis one step further by examining the possible reduction in ambient ozone concentration in southern California.

  10. 75 FR 34776 - Florida Power & Light Company; Turkey Point Nuclear Generating Plant, Units 3 and 4...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-18

    ... COMMISSION Florida Power & Light Company; Turkey Point Nuclear Generating Plant, Units 3 and 4; Environmental... licensee), for operation of the Turkey Point Nuclear Generating Plant, Units 3 and 4, located in Florida... consider approval of an exemption for Turkey Point, Units 3 and 4, from certain requirements of 10 CFR...

  11. Commonwealth Edison reduces coal dust problem

    SciTech Connect

    Not Available

    1985-10-01

    After a successful test program, Commonwealth Edison is reducing the potential for coal dust explosions by installing mechanical agglomerating pin-mixer equipment in vacuum building and crusher houses. The devices mix coal dust with a controlled, small amount of moisture to form round pellets that can be discharged to the conveyor system and the boiler. As the pellets densify and grow inside the Dustmaler, they move almost as fast as the pins, which provides the unit's high efficiency. 2 figures.

  12. 76 FR 39445 - Northern States Power Company-Minnesota; Prairie Island Nuclear Generating Plant, Units 1 and 2...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-06

    ... COMMISSION Northern States Power Company--Minnesota; Prairie Island Nuclear Generating Plant, Units 1 and 2... Company--Minnesota (licensee), the ] operator of Prairie Island Nuclear Generating Plant, Units 1 and 2... 39, Regarding Prairie Island Nuclear Generating Plant, Units 1 and 2,'' issued May 2011,...

  13. Boston Edison and LG&E win 7th annual substation design contest

    SciTech Connect

    Beaty, W.

    1996-07-01

    Boston`s Edison`s Network Station 53 won First Place in the engineering/operations category of Electric Light & Power`s 7th annual substation design contest. Station 53 also took Second Place in the aesthetic design category. Boston Edison is no stranger to the contest, having won top honors in the aesthetic category in the very first contest in 1990. That same year, Boston took Second Place in engineering/operations design and Third Place in aesthetic design. Station 53 occupies a 12,074-square-foot site in the heart of the Boston financial district. It replaces an existing station where the land was required for Boston`s Central Artery project. Great care was taken to ensure that Station 53 would blend into the cityscape and be pleasing to the eye. The architectural treatment was designed by the Boston Anderson-Nichols & Company Inc., in cooperation with the Boston Redevelopment Authority. The latest in engineering technology was utilized to guarantee reliability, maintain the highest service quality and provide capacity for future load growth in the downtown area. Station 53 is supplied by two underground 115-kV pipe-type transmission cables. Unattended and remotely operated, Station 53 has the capability of sectionalizing the 115-kV power supply by remote control to isolate the faulted sections.

  14. Photocopy of a photograph (original taken for the Edison Co.) ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of a photograph (original taken for the Edison Co.) Unknown, Photographer, 1939 AERIAL VIEW (SOUTH) SHOWING NORTH ELEVATION AND OTHER LABORATORY BUILDINGS AROUND THE COURTYARD - Thomas A. Edison Laboratories, Machine Shop & Library, Main Street & Lakeside Avenue, West Orange, Essex County, NJ

  15. One corner of the third floor has examples of Edison ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    One corner of the third floor has examples of Edison motion picture projectors in rather poor condition. Better preserved examples are in storage in Vault #12. - Thomas A. Edison Laboratories, Building No. 5, Main Street & Lakeside Avenue, West Orange, Essex County, NJ

  16. Update on Student Achievement for Edison Schools Inc.

    ERIC Educational Resources Information Center

    Nelson, F. Howard; Van Meter, Nancy

    In this report on student achievement in Edison Schools, the American Federation of Teachers compares student performance on state assessments in 2000-01 in each Edison-run school with other comparable schools in the state, generally those schools with the same grade level and similar populations of low-income students. These comparisons include…

  17. The Edison Project's Plan to Redefine Public Education.

    ERIC Educational Resources Information Center

    Schmidt, Benno C., Jr.

    1995-01-01

    The Edison Project will reconfigure time, deploy truly professional teachers, and utilize technologies in powerful new ways. Other Edison design highlights include its research basis; clear, defining values; high universal standards; five-domain curriculum; proven, individualized instructional methods; creative organization; true accountability;…

  18. High Stakes for Edison: A Rejoinder to John Chubb

    ERIC Educational Resources Information Center

    Campbell, Peter

    2007-01-01

    In this rejoinder to John Chubb's reply to "Edison Is the Symptom, NCLB Is the Disease," the author argues that Edison offers feel-good measures without really solving any of the problem of schools in poverty. Defending his original argument, the author cites a RAND study that questions the results Chubb claims. The study indicates the…

  19. The Edison Project Scores--and Stumbles--in Boston.

    ERIC Educational Resources Information Center

    Farber, Peggy

    1998-01-01

    Evidence from the Boston Renaissance Charter School suggests that the Edison Project is struggling fitfully to learn school management. Reliance on suspension and physical restraints demonstrates Edison Project's lack of experience with inner-city children. Test scores are up, but faculty are warring over school mission, teachers are struggling to…

  20. Edison Is the Symptom, NCLB Is the Disease

    ERIC Educational Resources Information Center

    Campbell, Peter

    2007-01-01

    Engaging students requires giving them a say in what they learn and how they will learn it. However, in strictly disciplined, rule-bound schools with test-driven curricula, this cannot happen. Edison Schools, Inc., a for-profit Education Management Organization (EMO), and Confluence Academy, an Edison-run school located in one of the most…

  1. 75 FR 76054 - Detroit Edison Company Fermi, Unit 2; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-07

    ...), located in Monroe County, Michigan. The licensee anticipates using rail to ship radioactive waste. From... report to the NRC if shipments of low-level radioactive waste are not acknowledged by the intended... elapse during shipments of low-level radioactive waste before DECo is required to investigate and file...

  2. Applicability of PSD to the Consolidated Edison Company

    EPA Pesticide Factsheets

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  3. Analysis of a homemade Edison tinfoil phonograph.

    PubMed

    Sagers, Jason D; McNeese, Andrew R; Lenhart, Richard D; Wilson, Preston S

    2012-10-01

    Thomas Edison's phonograph was a landmark acoustic invention. In this paper, the phonograph is presented as a tool for education in acoustics. A brief history of the phonograph is outlined and an analogous circuit model that describes its dynamic response is discussed. Microphone and scanning laser Doppler vibrometer (SLDV) measurements were made on a homemade phonograph for model validation and inversion for unknown model parameters. SLDV measurements also conclusively illustrate where model assumptions are violated. The model elements which dominate the dynamic response are discussed.

  4. Using OFI libfabric on Cori/Edison

    SciTech Connect

    Pritchard, Howard Porter; Choi, Sung-Eun

    2016-08-22

    These are slides from a presentation during an NERSC site visit to Los Alamos National Laboratory. The following topics are covered: building/installing libfabric, OpenMPI using libfabric, MPICH using libfabric, Open SHMEM (Sandia), other applications, and what is next. The next steps are: get a libfabric 1.4 out, it would be nice to have libfabric 1.4 installed in system space on Cori, add libfabric modules on Cori, might be a good idea to have a SLURM PMI module to simplify its use when building/using Open MPI and MPICH built to use libfabric, and upgrade Edison to CLE 5.2 UP04 or newer.

  5. Edison - The next generation infrared space observatory

    NASA Technical Reports Server (NTRS)

    Thronson, H. A., Jr.; Davies, J. K.; Hackwell, J.; Hawarden, T. G.; Knacke, R. F.; Lester, D.; Mountain, C. M.

    1992-01-01

    Edison, a large-aperture, radiatively-cooled telescope, is proposed as the major international mission to follow the current generation of cryogenically-cooled infrared space telescopes. It is being studied at present as a 2.5-3.5 m mixed radiatively- and mechanically-cooled facility optimized to investigate the wavelength range 3-100+ microns. This paper outlines the status of the project, discusses some aspects of a smaller-aperture 'precursor' mission, and describes a portion of the baseline science mission.

  6. Advanced Communication and Control of Distributed Energy Resources at Detroit Edison

    SciTech Connect

    Haukur Asgeirsson; Richard Seguin

    2004-01-31

    The project objective was to create the communication and control system, the process and the economic procedures that will allow owners (e.g., residential, commercial, industrial, manufacturing, etc.) of Distributed Energy Resources (DER) connected in parallel to the electric distribution to have their resources operated in a manner that protects the electric utility distribution network and personnel that may be working on the network. The Distribution Engineering Workstation (DEW) (a power flow and short circuit modeling tool) was modified to calculate the real-time characteristics of the distribution network based on the real-time electric distribution network information and provide DER operating suggestions to the Detroit Edison system operators so that regional electric stability is maintained. Part of the suggestion algorithm takes into account the operational availability of DER’s, which is known by the Energy Aggregator, DTE Energy Technologies. The availability information will be exchanged from DTE Energy Technologies to Detroit Edison. For the calculated suggestions to be used by the Detroit Edison operators, procedures were developed to allow an operator to operate a DER by requesting operation of the DER through DTE Energy Technologies. Prior to issuing control of a DER, the safety of the distribution network and personnel needs to be taken into account. This information will be exchanged from Detroit Edison to DTE Energy Technologies. Once it is safe to control the DER, DTE Energy Technologies will issue the control signal. The real-time monitoring of the DECo system will reflect the DER control. Multi-vendor DER technologies’ representing approximately 4 MW of capacity was monitored and controlled using a web-based communication path. The DER technologies included are a photovoltaic system, energy storage, fuel cells and natural gas/diesel internal combustion engine generators. This report documents Phase I result for the Detroit Edison

  7. Detroit Edison's Fermi 1 - Preparation for Reactor Removal

    SciTech Connect

    Swindle, Danny

    2008-01-15

    This paper is intended to provide information about the ongoing decommissioning tasks at Detroit Edison's Fermi 1 plant, and in particular, the work being performed to prepare the reactor for removal and disposal. In 1972 Fermi 1 was shutdown and the fuel returned to the Atomic Energy Commission. By the end of 1975, a retirement plan was prepared, the bulk sodium removed, and the plant placed in a safe store condition. The plant systems were left isolated with the sodium containing systems inert with carbon dioxide in an attempt to form a carbonate layer, thus passivating the underlying reactive sodium. In 1996, Detroit Edison determined to evaluate the condition of the plant and to make recommendations in relation to the Fermi 1 future plans. At the end of 1997 approval was obtained to remove the bulk asbestos and residual alkali-metals (i.e., sodium and sodium potassium (NaK)). In 2000, full nuclear decommissioning of the plant was approved. To date, the bulk asbestos insulation has been removed, and the only NaK remaining is located in six capillary instrument tubes. The remaining sodium is contained within the reactor, two of the three primary loops, and miscellaneous removed pipes and equipment to be processed. The preferred method for removing or reacting sodium at Fermi 1 is by injecting superheated steam into a heated, nitrogen inert system. The byproducts of this reaction are caustic sodium hydroxide, hydrogen gas, and heat. The decision was made to separate the three primary loops from the reactor for better control prior to processing each loop and the reactor separately. The first loop has already been processed. The main focus is now to process the reactor to allow removal and disposal of the Class C waste prior to the anticipated June 2008 closure of the Barnwell radioactive waste disposal facility located in South Carolina. Lessons learnt are summarized and concern: the realistic schedule and adherence to the schedule, time estimates, personnel

  8. Power plant development at Mammoth Project

    SciTech Connect

    Holt, B.; Campbell, R.G.

    1984-04-01

    The Mammoth Geothermal Project is located within the Long Valley Known Geothermal Resources Area (KGRA) on the eastern slope of the Sierra Nevada mountain range of California some 300 miles north of Los Angeles. The plant is owned by Mammoth-Pacific (M-P), a joint venture of Pacific Energy Resources Incorporated and Mammoth Binary Power Company. The plan is to build two identical 3500 kW (net) air-cooled binary cycle geothermal power plants scheduled for completion in mid 1984. Nearly all the residential and commercial space heating in the Mammoth Lakes area is electrical. Electrical usage peaks in the wintertime, unlike the rest of the Edison system. While some power is provided by hydro plants in the area, most of the Edison supply arrives via a transmission line connecting to Edison facilities in the Mojave desert some 200 miles to the south. Peak power consumption in the area is about 40 MWe. The need to augment energy needs in the area by producing electricity from geothermal resources and using geothermal heat to replace electricity for space heating has long been recognized. The feasibility of this project is discussed.

  9. 77 FR 65417 - Northern States Power Company (Prairie Island Nuclear Generating Plant Independent Spent Fuel...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-26

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Northern States Power Company (Prairie Island Nuclear Generating Plant Independent Spent Fuel...(c) and 2.321(b), the Atomic Safety and Licensing Board (Board) in the above-captioned Prairie...

  10. Installation of an ENERGEO Biomass Power Plant at a Lumber Company

    DTIC Science & Technology

    1995-06-01

    NUMBERS N/A 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) ENERGEO, Incorporated 28531 La Maravilla Laguna Niguel, California 92656 U.S. EPA...Washington, DC INSTALLATION OF AN ENERGEO BIOMASS POWER PLANT AT A LUMBER COMPANY Charles F. Sanders ENERGEO, Incorporated 28531 La Maravilla

  11. 76 FR 52356 - Indiana Michigan Power Company, Donald C. Cook Nuclear Plant, Unit 1; Environmental Assessment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-22

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Indiana Michigan Power Company, Donald C. Cook Nuclear Plant, Unit 1; Environmental Assessment and Finding of No Significant Impact The U.S. Nuclear Regulatory Commission (NRC or the Commission)...

  12. 77 FR 11173 - Renewal of Facility Operating License No. NPF-30, Union Electric Company, Callaway Plant, Unit 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-24

    ... COMMISSION Renewal of Facility Operating License No. NPF-30, Union Electric Company, Callaway Plant, Unit 1... Electric Company to operate the Callaway Plant, Unit 1 (Callaway), at 3565 megawatts thermal. The renewed... specified in the current license. Callaway is located in Callaway County, Missouri and its current...

  13. 75 FR 80545 - Carolina Power & Light Company; H.B. Robinson Steam Electric Plant, Unit No. 2; Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-22

    ... COMMISSION Carolina Power & Light Company; H.B. Robinson Steam Electric Plant, Unit No. 2; Environmental..., ``Physical protection of plants and materials,'' for Facility Operating License No. DPR-23, issued to Carolina Power & Light Company (the licensee), for operation of the H. B. Robinson Steam Electric...

  14. What would Edison do with solid state lighting?

    NASA Astrophysics Data System (ADS)

    Ferguson, Ian T.; Melton, Andrew; Xu, Tianming; Jamil, Muhammad; Fenwick, Will

    2010-08-01

    Thomas Edison is widely regarded as the greatest inventor in history and the most prominent individual behind the invention of the electric light. His impressive characteristics as an individual that led to his amazing success as an innovator continue to be an inspiration for researchers today. This paper considers how Edison might proceed in developing solid state lighting into a technology capable of displacing incumbent light sources, including his own incandescent lamps, then reviews some of the "Edison-like" contributions made to solid state lighting by the Next Generation Lighting research program at Georgia Tech.

  15. Green Infrastructure Research and Demonstration at the Edison Environmental Center

    EPA Science Inventory

    This presentation will review the need for storm water control practices and will present a portion of the green infrastructure research and demonstration being performed at the Edison Environmental Center.

  16. Permeable Pavement Monitoring at the Edison Environmental Center Demonstration Site

    EPA Science Inventory

    The presentation covers the following monitoring objectives at the demonstration site at Edison, NJ: Hydrologic performance, water quality performance, urban heat island effects, maintenance effects and infiltration water parameters. There will be a side by side monitoring of ...

  17. RadNet Air Data From Edison, NJ

    EPA Pesticide Factsheets

    This page presents radiation air monitoring and air filter analysis data for Edison, NJ from EPA's RadNet system. RadNet is a nationwide network of monitoring stations that measure radiation in air, drinking water and precipitation.

  18. Electric Avenue. A Utility Company's Work Experience Program Broadens Opportunities for Students.

    ERIC Educational Resources Information Center

    Ingles, Pat

    1994-01-01

    A job skills partnership between Southern California Edison Company and local high schools pairs juniors and seniors with journeyworker mentors for a year, experiencing six-week rotations in maintenance, operations, administration, warehouse, and technical occupations. (JOW)

  19. 76 FR 66333 - Carolina Power & Light Company, H.B. Robinson Steam Electric Plant, Unit No. 2; Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-26

    ... through the ``Generic Environmental Impact Statement for License Renewal of Nuclear Plants: H.B. Robinson... COMMISSION Carolina Power & Light Company, H.B. Robinson Steam Electric Plant, Unit No. 2; Environmental... operation of the H. B. Robinson Steam Electric Plant, Unit 2 (HBRSEP), located in Darlington County,...

  20. 75 FR 82414 - Carolina Power & Light Company; H. B. Robinson Steam Electric Plant, Unit No. 2; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-30

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Carolina Power & Light Company; H. B. Robinson Steam Electric Plant, Unit No. 2; Exemption 1.0 Background Carolina Power & Light Company (CP&L, the licensee) is the holder of Renewed Facility...

  1. 75 FR 11579 - Carolina Power & Light Company H. B. Robinson Steam Electric Plant, Unit No. 2; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-11

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Carolina Power & Light Company H. B. Robinson Steam Electric Plant, Unit No. 2; Exemption 1.0 Background Carolina Power & Light Company (the licensee) is the holder of Facility Operating License No....

  2. 75 FR 57535 - Connecticut Yankee Atomic Power Company; Haddam Neck Plant; Notice of Issuance of Amendment To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-21

    ... COMMISSION Connecticut Yankee Atomic Power Company; Haddam Neck Plant; Notice of Issuance of Amendment To... application dated April 2, 2009, as supplemented March 30, 2010, Connecticut Yankee Atomic Power Company... No. 203 complies with the standards and requirements of the Atomic Energy Act of 1954, as...

  3. Large CFB power plant design and operating experience: Texas-New Mexico Power Company 150 MWe (net) CFB power plant

    SciTech Connect

    Riley, K.; Cleve, K.; Tanca, M.

    1995-12-31

    The first unit of the TNP One CFB power plant was successfully put on line by Texas-New Mexico Power Company (TNP) in Robertson County, Texas, US in 1990. Unit 2 came on line one year later. This grassroots plant fires Texas lignite. The two identical CFB units were each designed for 150 MWe net electrical generation. The units have operated at 155 MWe net for extended periods of time without modifications. The boilers have additional capacity but are limited by the balance of plant. The TNP One plant was awarded the Power Plant of the Year Award by Power magazine in 1991 advancing CFB technology in large generating facilities. The plant was designed for maximum fuel flexibility with guaranteed full load operation on either Texas lignite, western coal or natural gas. The plant has fired the following fuels, to date: lignite (base fuel), natural gas (0--100% with lignite), delayed petroleum coke (0--100% with lignite), plant generated waste oils (small amounts), oil filter fluff (small amounts) and a waste product of pelletized reflective tape. Future testing is planned to test burn shredded tires. While firing all fuels, the plant could attain full load and meet all environmentally permitted emissions without any boiler modifications or compromises in boiler efficiency. This high flexibility of the plant can be attributed to the two large fluidized bed heat exchangers (FBHEs) for steam temperature and combustor temperature control. The facility is a mine mouth operation burning the local Texas lignite. The delayed petroleum cokes fired originated from various supply sources from the Texas/Louisiana area.

  4. Thomas Edison's Inventions in the 1900s and Today: From "New" to You! [Lesson Plan].

    ERIC Educational Resources Information Center

    2002

    The purpose of this lesson is to familiarize students with life and technology around 1900 so that they can better understand how Thomas Edison and his many inventions influenced both. Without some understanding of Edison's time, it is unclear just how significant an impact Edison had on the world, both then and now. While the incandescent light…

  5. The Fight To Save the Edison Charter in San Francisco. Briefing.

    ERIC Educational Resources Information Center

    Dphrepaulezz, Diallo

    In 1998, the San Francisco Board of Education granted a charter to Edison Schools, Inc., to manage the Edison Charter Academy. In 2001, it commenced a formal investigation of complaints that Edison had materially violated its charter and notified the school of its intent to revoke the charter. This briefing traces the events from the commencement…

  6. 76 FR 34691 - Edison Mission Energy v. Midwest Independent Transmission System Operator, Inc.; Notice of Complaint

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-14

    ... Energy Regulatory Commission Edison Mission Energy v. Midwest Independent Transmission System Operator... Energy Regulatory Commission (Commission), 18 CFR 385.206 (2011), Edison Mission Energy, on behalf of NorthStar and Pheasant Ridge wind projects (Edison Wind Projects) (collectively Complainants), filed...

  7. 76 FR 20722 - In the Matter of Indiana Michigan Power Company; DC Cook Nuclear Plant Independent Spent Fuel...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-13

    ... COMMISSION In the Matter of Indiana Michigan Power Company; DC Cook Nuclear Plant Independent Spent Fuel... notice, in the matter of DC Cook Nuclear Plant Independent Spent Fuel Storage Installation (ISFSI) Order..., 2001, terrorists simultaneously attacked targets in New York, NY, and Washington, DC, using...

  8. The Invention Factory: Thomas Edison's Laboratories. Teaching with Historic Places.

    ERIC Educational Resources Information Center

    Bolger, Benjamin

    This lesson explores the group of buildings in West Orange, New Jersey, built in 1887, that formed the core of Thomas Edison's research and development complex. They consisted of chemistry, physics, and metallurgy laboratories; machine shop; pattern shop; research library; and rooms for experiments. The lesson explains that the prototypes (ideas…

  9. The Edison Environmental Center Permeable Pavement Site - slides

    EPA Science Inventory

    This is a presentation for a second Community Outreach Event called "Chemistry Works!" at West Windsor Public Library on Saturday, November 5th. It will review the permeable pavement research project at the Edison Environmental center. Besides slide persentation, two demo units w...

  10. Simple Experiments on Magnetism and Electricity...from Edison.

    ERIC Educational Resources Information Center

    Schultz, Robert F.

    Background information, lists of materials needed and procedures used are provided for 16 simple experiments on electricity and magnetism. These experiments are organized into sections dealing with: (1) Edison's carbon experiments (building a galvanometer, investigating the variable conductivity of carbon, and examining the carbon transmitter…

  11. Edison - A New Cray Supercomputer Advances Discovery at NERSC

    ScienceCinema

    Dosanjh, Sudip; Parkinson, Dula; Yelick, Kathy; Trebotich, David; Broughton, Jeff; Antypas, Katie; Lukic, Zarija, Borrill, Julian; Draney, Brent; Chen, Jackie

    2016-07-12

    When a supercomputing center installs a new system, users are invited to make heavy use of the computer as part of the rigorous testing. In this video, find out what top scientists have discovered using Edison, a Cray XC30 supercomputer, and how NERSC's newest supercomputer will accelerate their future research.

  12. Urban Watershed Research Facility at Edison Environmental Center

    EPA Science Inventory

    The Urban Watershed Research Facility (UWRF) is an isolated, 20-acre open space within EPA’s 200 acre Edison facility established to develop and evaluate the performance of stormwater management practices under controlled conditions. The facility includes greenhouses that allow ...

  13. Rodin, Patton, Edison, Wilson, Einstein: Were They Really Learning Disabled?

    ERIC Educational Resources Information Center

    Adelman, Kimberly A.; Adelman, Howard S.

    1987-01-01

    The practice of posthumously diagnosing historical figures is discussed. Emphasis is on the unsatisfactory nature of evidence found for those diagnosed as learning-disabled or dyslexic and the possibility of other explanations for identified problems. Posthumous diagnoses of Auguste Rodin, George Patton, Thomas Edison, Woodrow Wilson, and Albert…

  14. Edison - A New Cray Supercomputer Advances Discovery at NERSC

    SciTech Connect

    Dosanjh, Sudip; Parkinson, Dula; Yelick, Kathy; Trebotich, David; Broughton, Jeff; Antypas, Katie; Lukic, Zarija, Borrill, Julian; Draney, Brent; Chen, Jackie

    2014-02-06

    When a supercomputing center installs a new system, users are invited to make heavy use of the computer as part of the rigorous testing. In this video, find out what top scientists have discovered using Edison, a Cray XC30 supercomputer, and how NERSC's newest supercomputer will accelerate their future research.

  15. Disposal of United Nuclear Company materials at the Y-12 Plant

    SciTech Connect

    Butz, T.R.; Stoner, H.H.

    1983-12-19

    The UNC Recovery Systems Company, located at Wood River Junction, Rhode Island, was involved in the recovery of enriched uranium from scrap materials generated primarily in defense program activities of the DOE and its predecessor agencies. Following shutdown of the recovery operations in August 1980, UNC was required to decontaminate facilities and the associated waste lagoon systems and to remove the resultant low-level radioactive waste out of the state of Rhode Island. In view that the waste resulted from the processing of scrap materials generated in DOE Defense Programs activities and due to the lack of adequate capacity at commercial waste disposal facilities, DOE agreed to accept the waste for burial at the Y-12 Plant. Site characterization and well monitoring results are presented of the disposal site.

  16. The Edison Responsive Environment Learning System, or the Talking Typewriter Developed by Thomas A. Edison Laboratory, a Subsidiary of McGraw Edison Company.

    ERIC Educational Resources Information Center

    Sanderson, Barbara A.; Kratochvil, Daniel W.

    The "Talking Typewriter" is a computerized electric typewriter with visual and audio capabilities. It was designed to create an environment where learning to read would be a successful, enjoyable experience for the student by allowing him to explore, discover relationships, to progress at his own speed, and to receive feedback. This…

  17. 76 FR 9348 - Southern California Edison Company, Pacific Gas and Electric Company, San Diego Gas & Electric...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-17

    ...), and find that the CPUC's AB 1613 Decisions \\2\\ violate PURPA and the Commission's Regulations implementing PURPA. \\1\\ 16 U.S.C. 824a-3(h)(2) (2006). \\2\\ The AB 1613 Decisions consist of the following...

  18. 75 FR 11566 - Firstenergy Nuclear Operating Company, Firstenergy Nuclear Generation Corp., Ohio Edison Company...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-11

    ... Web site and on the Federal rulemaking Web site Regulations.gov . Because your comments will not be... disclosed. You may submit comments by any one of the following methods. Federal Rulemaking Web site: Go to... be submitted electronically through this Web site. Address questions about NRC dockets to...

  19. 75 FR 75704 - Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 And 2); Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-06

    ... From the Federal Register Online via the Government Publishing Office ] NUCLEAR REGULATORY COMMISSION Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 And 2); Notice of... Dr. Tianqing Cao, Senior Seismologist, Office of Nuclear Material Safety and Safeguards, has...

  20. 75 FR 9625 - Northern States Power Company-Minnesota Prairie Island Nuclear Generating Plant, Units 1 and 2...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-03

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Northern States Power Company--Minnesota Prairie Island Nuclear Generating Plant, Units 1 and 2... holder of Facility Operating License Nos. DPR-42 and DPR-60, which authorize operation of the...

  1. 75 FR 6225 - Northern States Power Company-Minnesota; Prairie Island Nuclear Generating Plant Units 1 and 2...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-08

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Northern States Power Company--Minnesota; Prairie Island Nuclear Generating Plant Units 1 and 2; Environmental Assessment and Finding of No Significant Impact The U.S. Nuclear Regulatory Commission (NRC)...

  2. 17. Photocopy of photograph (original copy in Edison collection). Photographer ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. Photocopy of photograph (original copy in Edison collection). Photographer and date unknown, although probably taken before 1920. VIEW OF NORTH END OF TULE RIVER POWERHOUSE SHOWING POWERHOUSE AT PHOTO CENTER, TRANSFORMER BUILDING TO RIGHT OF POWERHOUSE, GARAGE TO LEFT OF POWERHOUSE, AND OPERATOR COTTAGE BEHIND POWERHOUSE AND TRANSFORMER HOUSE. VIEW TO SOUTHEAST. - Tule River Hydroelectric Project, Water Conveyance System, Middle Fork Tule River, Springville, Tulare County, CA

  3. 19. Photocopy of photograph (original copy in Edison collection). Photographer ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. Photocopy of photograph (original copy in Edison collection). Photographer and date unknown, although probably taken before 1920. SOUTH SIDE OF TULE RIVER POWERHOUSE COMPLEX SHOWING OPERATOR COTTAGE AT PHOTO RIGHT AND POWERHOUSE AND TRANSFORMER BUILDING IN BACKGROUND AT PHOTO LEFT. LINE OF BURIED PENSTOCK IS VISIBLE ON SIDE OF HILL AT PHOTO CENTER. VIEW TO NORTH. - Tule River Hydroelectric Project, Water Conveyance System, Middle Fork Tule River, Springville, Tulare County, CA

  4. 11. Photocopy of photograph (original copy in Edison collection). Photographer ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. Photocopy of photograph (original copy in Edison collection). Photographer and date unknown, although photo taken prior to 1930 reconstruction of Project flumes. VIEW OF ORIGINAL SOUTH FORK OF THE TULE RIVER MIDDLE FORK "BOX" WOOD FLUME BRANCH SHOWING NORTH FORK OF TULE RIVER MIDDLE FORK CROSSING. VIEW TO NORTHWEST. - Tule River Hydroelectric Project, Water Conveyance System, Middle Fork Tule River, Springville, Tulare County, CA

  5. NASA Facts: Edison Demonstration of Spacecraft Networks (EDSN) Mission

    NASA Technical Reports Server (NTRS)

    Ord, Stephen; Yost, Bruce D.; Petro, Andrew J.

    2013-01-01

    NASA's Edison Demonstration of Smallsat Networks (EDSN) mission will launch and deploy a swarm of 8 cubesats into a loose formation approximately 500 km above Earth. EDSN will develop technology to send multiple, advanced, yet affordable nanosatellites into space with cross-link communications to enable a wide array of scientific, commercial, and academic research. Other goals of the mission include lowering the cost and shortening the development time for future small spacecraft.

  6. Rohm and Haas: Company Uses Knoxville Plant Assessment Results to Develop Best Practices Guidelines and Benchmark for Its Other Sites

    SciTech Connect

    2003-05-01

    Rohm and Haas conducted a plant-wide energy assessment at its Knoxville, Tennessee, chemicals manufacturing facility. The assessment identified potential annual energy savings of nearly 47,000 MMBtu in steam and fuel and 11,000 MWh in electricity. Annual cost savings were estimated at almost $1.5 million. After the assessment was replicated in California and Kentucky plants, the company's additional estimated cost savings were $500,000 annually. Additional annual energy savings were about 23,000 MMBtu and 6,000 MWh. The assessments also indicated the plants would reduce nitrous oxide emissions.

  7. American Water Heater Company: Compressed Air System Optimization Project Saves Energy and Improves Production at Water Heater Plant

    SciTech Connect

    2003-11-01

    In 2001, American Water Heater Company implemented a system-level improvement project on the compressed air system that serves its manufacturing plant in Johnson City, Tennessee. The plant now operates with less compressor capacity, which has reduced its energy consumption and maintenance needs. The project's total cost was $228,000. The annual compressed air energy savings (2,345,000 kWh) and maintenance savings total $160,000, yielding a simple payback of 17 months. Furthermore, the system now supports the plant's production processes more effectively, which has improved product quality and increased production.

  8. Southern California Edison bets on energy alternatives

    NASA Astrophysics Data System (ADS)

    Riley, W. B.

    1981-08-01

    A 10-MW solar-thermal generating plant and a 100-MW integrated coal-gasification combined cycle (IGCC) power facility are being built to develop a wide range of renewable, alternative power sources by 1990. The solar-thermal generating plant will use steam at 500 C and 100 kg/sq cm to produce 10 MW of electricity. It consists of a 1818 heliostat array, each weighing 1155 kg and having 12 mirrors which are rotated at either 0.25 deg/min (for sun following) or 22.5 deg/min (for major focusing and defocusing). A master control system allows both fully automatic and manual operation, and a beam-characterization system permits the operator to check the alignment of each heliostat individually. A central receiver, consisting of 24 panels of tubing, produces steam at 500 C and 100 kg/sq cm. The thermal storage unit uses crushed granite to absorb 50 kWht/cu m, allowing the plant to operate after sundown. The IGCC plant integrates the coal-gasification plant and the combined-cycle unit, demonstrating operational flexibility and reliability, load-following capability, and compliance with environmental regulations. The gasifier produces 79,300 cu m/h of a mixture of 51% CO and 36% H at 1370 C,and the gas turbine regenerates 65 MW through its own generator.

  9. Implementation of Case-Based Reasoning System for Knowledge Management of Power Plant Construction Projects in a Korean Company

    NASA Astrophysics Data System (ADS)

    Jang, Gil-Sang

    Recently, plant construction industries are enjoying a favorable business climate centering around developing countries and oil producing countries rich in oil money. This paper proposes a methodology of implementing corporation-wide case-based reasoning (CBR) system for effectively managing lessons learned knowledge like experiences and know-how obtained in performing power plant construction projects. Our methodology is consisted of 10 steps: user requirement analysis, information modeling, case modeling, case base design, similarity function design, user interface design, case base building, CBR module development, user interface development, integration test. Also, to illustrate the usability of proposed methodology, the practical CBR system is implemented for the plant construction business division of ’H’ company which has international competitiveness in the field of plant construction industry. At present, our CBR system is successfully utilizing as storing, sharing, and reusing the knowledge which is accumulated in performing power plant construction projects in the target enterprise.

  10. 78 FR 27260 - Southern California Edison, San Onofre Nuclear Generating Station, Units 2 and 3 Request for Action

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-09

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Southern California Edison, San Onofre Nuclear Generating Station, Units 2 and 3 Request for... Southern California Edison (SCE) to ] submit a license amendment application for the design...

  11. Electrical Connections: Letters to Thomas Edison in Response to His Claim of Solving Incandescent Lighting, 1878.

    ERIC Educational Resources Information Center

    Bazerman, Charles

    1994-01-01

    Discusses the way in which letters sent to Thomas Edison following the report that he had solved the problem of incandescent lighting reveal the many discursive worlds that Edison's work touched. Claims these letters indicate how a technological accomplishment is also a multiple, complex social, and communicative accomplishment, creating place and…

  12. Assistance and Accountability in Externally Managed Schools: The Case of Edison Schools, Inc.

    ERIC Educational Resources Information Center

    Marsh, Julie; Hamilton, Laura; Gill, Brian

    2008-01-01

    Edison Schools, Inc., is the largest and most visible among a growing number of Education Management Organizations that have entered into contracts to manage public schools, including both conventional and charter schools. Edison's approach to managing schools is comprehensive, and it distinguishes itself from most other school improvement…

  13. 75 FR 66795 - Enesco, LLC, Gund Division, Distribution Center, Edison, NJ; Notice of Affirmative Determination...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-29

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF LABOR Employment and Training Administration Enesco, LLC, Gund Division, Distribution Center, Edison, NJ; Notice of... workers and former workers of Enesco, LLC, Gund Division, Distribution Center, Edison, New Jersey...

  14. EDISON project and radiatively cooled infrared space observatories

    NASA Astrophysics Data System (ADS)

    Thronson, Harley A.; Hawarden, Timothy G.; Bradshaw, Tom W.; Orlowska, Anna H.; Penny, Alan J.; Turner, R. F.; Rapp, Donald

    1993-11-01

    We describe the current design for Edison, the first large radiatively-cooled infrared space observatory, now under consideration by the European Space Agency. Without the large cryogen tanks, more of the spacecraft can be filled with light-collecting optics and, of course, the observatory has no built-in lifetime. Our proposal is for a telescope with a 1.7 m primary to be launched by an Atlas, Ariane 5, or Proton. The baseline orbit for the observatory is a 'halo' around L2, a location which allows additional radiating area to be placed anti-sunward. Models of the temperature behavior of the observatory indicate an equilibrium temperature via radiation alone of about 20 K. Use of near-future cryo-coolers may allow optical system temperatures as low as approximately 15 K. Consequently, Edison will be limited in sensitivity by the celestial thermal background at wavelengths shortward of about 60 micrometers and by celestial source confusion at longer wavelengths.

  15. The Use of Simulation Models in Solving the Problems of Merging two Plants of the Company

    NASA Astrophysics Data System (ADS)

    Sedláček, Michal

    2017-01-01

    This paper focuses on utilization of analysis of different possibilities of merging two production sites with the help of simulation model of company processes. Software SIMUL8 was chosen as a development environment for its possibility of dynamic discrete simulation of company processes. In the first phase, it analyses current status of both production sites. It is followed by suggesting several possible solutions for their potential merger. Each solution is analyzed with the help of simulation models. They have been evaluated and the optimal solution was selected.

  16. 75 FR 76038 - General Motors Company Formerly Known as General Motors Corporation Willow Run Transmission Plant...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-07

    ... Willow Run Transmission Plant Including On-Site Leased Workers From Aerotek, Securitas, Knight Management... Corporation, Willow Run Transmission Plant, Ypsilanti, Michigan. The notice was published in the Federal... Motors Corporation, Willow Run Transmission Plant. The Department has determined that on-site...

  17. Exploring Distributed Energy Alternatives to Electrical Distribution Grid Expansion in Souhern California Edison Service Territory

    SciTech Connect

    Stovall, Therese K; Kingston, Tim

    2005-12-01

    Distributed energy (DE) technologies have received much attention for the energy savings and electric power reliability assurances that may be achieved by their widespread adoption. Fueling the attention have been the desires to globally reduce greenhouse gas emissions and concern about easing power transmission and distribution system capacity limitations and congestion. However, these benefits may come at a cost to the electric utility companies in terms of lost revenue and concerns with interconnection on the distribution system. This study assesses the costs and benefits of DE to both consumers and distribution utilities and expands upon a precursory study done with Detroit Edison (DTE)1, by evaluating the combined impact of DE, energy-efficiency, photovoltaics (a use of solar energy), and demand response that will shape the grid of the future. This study was funded by the U.S. Department of Energy (DOE), Gas Research Institute (GRI), American Electric Power (AEP), and Gas Technology Institute's (GTI) Distributed Energy Collaborative Program (DECP). It focuses on two real Southern California Edison (SCE) circuits, a 13 MW suburban circuit fictitiously named Justice on the Lincoln substation, and an 8 MW rural circuit fictitiously named Prosper on the Washington Substation. The primary objectives of the study were threefold: (1) Evaluate the potential for using advanced energy technologies, including DE, energy-efficiency (EE), demand response, electricity storage, and photovoltaics (PV), to reshape electric load curves by reducing peak demand, for real circuits. (2) Investigate the potential impact on guiding technology deployment and managing operation in a way that benefits both utilities and their customers by: (a) Improving grid load factor for utilities; (b) Reducing energy costs for customers; and (c) Optimizing electric demand growth. (3) Demonstrate benefits by reporting on a recently installed advanced energy system at a utility customer site. This

  18. J.R. Simplot Company to Reduce Emissions at Sulfuric Acid Plants in Three States

    EPA Pesticide Factsheets

    WASHINGTON -- The U.S. Environmental Protection Agency (EPA) and U.S. Department of Justice (DOJ) today announced a settlement with the J.R. Simplot Company that resolves alleged Clean Air Act violations related to modifications made at Simplot's fi

  19. Edison and the pure science ideal in 19th-century america.

    PubMed

    Hounshell, D A

    1980-02-08

    Between 1878 and 1882, key members of the American scientific community played an important role in Thomas A. Edison's work on electric lighting. Impressed by his abilities, these scientists came to regard Edison as a peer and led him to see himself as a scientific man. But Edison's high standing among scientists and the American public and his professed self-image as a scientist provoked America's noted experimental physicist, Henry A. Rowland, to make a "Plea for pure science" before the American Association for the Advancement of Science in 1883.

  20. [Plant genetic engineering in Monsanto company: from the first laboratory experiments to worldwide practical use].

    PubMed

    Konov, A L; Velchev, M; Parcel, D

    2005-01-01

    The history of modern biotechnology of agricultural plants is briefly considered in the article. Methods of genetic transformation and regeneration of transgenic plants as well as the mechanisms of resistance of genetically modified plants to herbicides and pests are discussed. By the example of genetically modified varieties and hybrids there are shown the ways of solving the problem of weeds and pests. The questions of biosafety legislation in different countries are considered.

  1. Southern California Edison High Penetration Photovoltaic Project - Year 1

    SciTech Connect

    Mather, B.; Kroposki, B.; Neal, R.; Katiraei, F.; Yazdani, A.; Aguero, J. R.; Hoff, T. E.; Norris, B. L.; Parkins, A.; Seguin, R.; Schauder, C.

    2011-06-01

    This report discusses research efforts from the first year of a project analyzing the impacts of high penetration levels of photovoltaic (PV) resources interconnected onto Southern California Edison's (SCE's) distribution system. SCE will be interconnecting a total of 500 MW of commercial scale PV within their service territory by 2015. This Year 1 report describes the need for investigating high-penetration PV scenarios on the SCE distribution system; discusses the necessary PV system modeling and distribution system simulation advances; describes the available distribution circuit data for the two distribution circuits identified in the study; and discusses the additional inverter functionality that could be implemented in order to specifically mitigate some of the undesirable distribution system impacts caused by high-penetration PV installations.

  2. Update to permeable pavement research at the Edison ...

    EPA Pesticide Factsheets

    Abstract: The EPA’s Urban Watershed Management Branch (UWMB) has been monitoring the permeable pavement demonstration site at the Edison Environmental Center, NJ since 2010. This site has three different types of permeable pavement including: interlocking concrete permeable pavers; porous concrete; and permeable asphalt. The parking lot is instrumented with water content reflectometers and thermistors for continuous monitoring and has four lined sections for each surface to capture permeable pavement infiltrate for water quality analyses.Previous technical releases concerning the demonstration site focused on monitoring techniques, observed chloride and nutrient concentrations, and infiltration and evaporation rates. Thispresentation summarizes past findings and addresses current water quality efforts. This presentation summarizes past findings and addresses current water quality efforts.

  3. Monitoring of the Permeable Pavement Demonstration Site at the Edison Environmental Center (Poster)

    EPA Science Inventory

    This is a poster on the permeable pavement parking lot at the Edison Environmental Center. The monitoring scheme for the project is discussed in-depth with graphics explaining the instrumentation installed at the site.

  4. Update to Permeable Pavement Research at the Edison Environmental Center - abstract

    EPA Science Inventory

    Abstract The EPA’s Urban Watershed Management Branch (UWMB) has been monitoring the permeable pavement demonstration site at the Edison Environmental Center, NJ since 2010. This site has three different types of permeable pavement including: interlocking concrete permeable pavers...

  5. Update to permeable pavement research at the Edison Environmental Center - slides

    EPA Science Inventory

    Abstract: The EPA’s Urban Watershed Management Branch (UWMB) has been monitoring the permeable pavement demonstration site at the Edison Environmental Center, NJ since 2010. This site has three different types of permeable pavement including: interlocking concrete permeable paver...

  6. Update to Permeable Pavement Research at the Edison Environmental Center - proceedings

    EPA Science Inventory

    The EPA’s Urban Watershed Management Branch (UWMB) has been monitoring the permeable pavement demonstration site at the Edison Environmental Center, NJ since 2010. This site has three different types of permeable pavements including interlocking concrete permeable pavers, p...

  7. 75 FR 67770 - General Motors Company, Formerly Known as General Motors Corporation, Orion Assembly Plant...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-03

    ..., Orion Assembly Plant, Including On-Site Leased Workers From Aerotek Automotive, Ryder and Premier... leased workers from Aerotek Automotive. The notice was published in the Federal Register on September 7... Corporation, Orion Assembly Plant, including on-site leased workers from Aerotek Automotive, Ryder and...

  8. The Edison infrared space observatory and the study of extra-solar planetary material

    NASA Technical Reports Server (NTRS)

    Thronson, H. A., Jr.; Hawarden, T. G.; Bally, J.; Rapp, D.; Stern, S. A.

    1994-01-01

    Edison is a proposed large-aperture, radiatively-cooled space observatory planned to operate at wavelengths between 2 and 130 micrometers or longer. Current estimates for the telescope allow an aperture of 1.7 m which will achieve a final equilibrium temperature of about 30 K, although use of cryocoolers may permit temperatures below 20 K. Edison will be a powerful tool to investigate our Solar System, as well as planetary material around distant stars. At near- and mid-infrared wavelengths, where planetary material emits most of its radiation, Edison will be the most sensitive photometric and spectroscopic observatory under current consideration by the space agencies. With its large aperture, Edison will be able both to resolve the structure in nearby circumstellar 'Vega disks' and to discriminate faint IR emission in the crowded environment of the galactic plane. With its long lifetime, Edison will allow extensive follow-up observations and increase the likelihood of catching transient events. We propose Edison as a precursor to elements of a future space-based IR interferometer.

  9. Success Continues: NASA-Developed Plant Health Measurement Technology is Becoming Big Business for Illinois Company

    NASA Technical Reports Server (NTRS)

    2003-01-01

    Originally produced in 2001, sales of Spectrum Technologies' CM 1000 chlorophyll meter have now topped $290,000 on 140 units. Up-to-date sales figures for 2003 have shown an almost 50% increase over the combined sales totals of 2001 and 2002. The CM 1000 chlorophyll meter identifies the failing health of a plant based on the chlorophyll content of the plant up to 16 days before it is physically detectable by the human eye. Poor health, 'stress' in a plant, is a result of unfavorable growing conditions; lack of nutrients, insufficient water, disease or insect damage.

  10. 75 FR 8753 - Carolina Power & Light Company, Brunswick Steam Electric Plant, Units 1 and 2; Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-25

    ... reactors, fuel, plant structures, support structures, water, or land at the BSEP site. The proposed actions...., design and construction of a new security building to support the new physical protection...

  11. Industrywide studies report of indepth survey: American Cyanamid Company, Fortier Plant, Westwego, Louisiana

    SciTech Connect

    Hills, B.

    1985-10-08

    An indepth survey of the American Cyanamid Company, Westwego, Louisiana was conducted in May, 1984. The facility produced acrylamide monomers and polyacrylamide. Acrylamide was produced by catalytic hydration of acrylonitrile within a closed reactor system to yield a 50% solution, which was then polymerized. Potential acrylamide exposures could occur from leaks in defective valves, during quality control sampling, while loading trucks and rail cars, and from contact with polymers that contained a monomer residue. Much of the acrylamide production area was open to natural ventilation. The author concludes that the mean acrylamide exposure at the facility is approximately 17% of the OSHA standard. Recommendations include rinsing the production equipment and conducting short term monitoring, especially when loading trucks.

  12. 75 FR 73135 - Southern Nuclear Operating Company, Inc. Joseph M. Farley Nuclear Plant, Environmental Assessment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-29

    ... licensee), for operation of the Joseph M. Farley Nuclear Plant, Units 1 and 2 (FNP), located in Houston... the FNP from the required implementation date of March 31, 2010, for several new requirements of 10 CFR Part 73. Specifically, FNP would be granted an exemption from being in full compliance...

  13. 75 FR 54388 - General Motors Company Formerly Known as General Motors Corporation, Orion Assembly Plant...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-07

    ..., Orion Assembly Plant Including On-Site Leased Workers From Aerotek Automotive Lake Orion, MI; Amended... leased from Aerotek Automotive were employed on-site at the Lake Orion, Michigan location of General... from Aerotek Automotive working on-site at the Lake Orion, Michigan location of General Motors...

  14. 75 FR 8152 - Pacific Gas and Electric Company; Diablo Canyon Power Plant Environmental Assessment and Finding...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-23

    ... From the Federal Register Online via the Government Publishing Office ] NUCLEAR REGULATORY... of No Significant Impact The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of an... change to radioactive effluents that affect radiation exposures to plant workers and members of...

  15. Update to Permeable Pavement Research at the Edison ...

    EPA Pesticide Factsheets

    The EPA’s Urban Watershed Management Branch (UWMB) has been monitoring the permeable pavement demonstration site at the Edison Environmental Center, NJ since 2010. This site has three different types of permeable pavements including interlocking concrete permeable pavers, pervious concrete, and porous asphalt. The permeable pavements are limited to parking spaces while adjacent driving lanes are impermeable and drain to the permeable surfaces. The parking lot is instrumented for continuous monitoring with thermistors and water content reflectometers that measure moisture as infiltrate passes through the storage gallery beneath the permeable pavements into the underlying native soil. Each permeable surface of the parking lot has four lined sections that capture infiltrate in tanks for water quality analyses; these tanks are capable of holding volumes up to 4.1 m3, which represents up to 38 mm (1.5 in.) for direct rainfall on the porous pavement and runoff from adjacent driving lanes that drain into the permeable surface.Previous technical releases concerning the demonstration site focused on monitoring techniques, observed chloride and nutrient concentrations, surface hydrology, and infiltration and evaporation rates. This presentation summarizes these past findings and addresses current water quality efforts including pH, solids analysis, total organic carbon, and chemical oxygen demand. Stormwater runoff continues to be a major cause of water pollution in

  16. 75 FR 70707 - Detroit Edison Company; Environmental Assessment and Finding of No Significant Impact

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-18

    ... radioactive waste before the licensee is required to investigate and file a report with the NRC. Specifically...-level radioactive waste shipment has been received by the intended recipient from 20 days to 35 days... the NRC, if shipments of low-level radioactive waste are not acknowledged by the intended...

  17. 75 FR 61456 - Southern California Edison Company; Notice of Application for Amendment of License, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-05

    ... . i. FERC Contact: Any questions regarding this notice should be directed to Mr. Jeremy Jessup (202) 502-6779 or Jeremy.Jessup@ferc.gov . j. Deadline for filing comments, motions to intervene and protest... structure and Mill Creek return water conveyance facility. l. Locations of the Application: A copy of...

  18. Status of the Southern California Edison Company 3 MW Wind Turbine Generator (WTG) demonstration project

    NASA Technical Reports Server (NTRS)

    Scheffler, R. L.

    1979-01-01

    To demonstrate the concept of utility scale electricity production from a high wind energy resource, a program was initiated to construct and test a 3 megawatt (3,000 kW) Schachle wind turbine generator near Palm Springs, California. The background and current status of this program are presented along with a summary of future planned program activities.

  19. 77 FR 70487 - Southern California Edison Company; Establishment of Atomic Safety and Licensing Board

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-26

    ... Licensing Board Panel that portion of Friends of the Earth's June 18, 2012 intervention petition challenging..., Maryland, this 19th day of November 2012. E. Roy Hawkens, Chief Administrative Judge, Atomic Safety...

  20. 75 FR 69136 - Southern California Edison Company, San Onofre Nuclear Generating Station, Units 2 and 3...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-10

    ... structures, support structures, water, or land at the SONGS 2 and 3 site. The proposed action is in... buildings or structures, nor any ground disturbing activities, beyond the security improvements...

  1. Lighting the Way for Systemic Reform: The Edison Project Launches Its Version of a Public-Private Partnership.

    ERIC Educational Resources Information Center

    McGriff, Deborah M.

    1995-01-01

    The Edison Project, advocating a new form of public-private partnership to reinvent education, has repeatedly encountered barriers such as state regulations, professional isolation, inertia, bureaucracy, miscommunication, and a finance and governance monopoly. Four communities will open Edison Project schools this fall. Superintendent Larry Vaughn…

  2. 75 FR 14211 - Southern California Edison, San Onofre Nuclear Generating Station, Unit 2 and Unit 3; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-24

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Southern California Edison, San Onofre Nuclear Generating Station, Unit 2 and Unit 3; Exemption 1.0 Background Southern California Edison (SCE, the licensee) is the holder of the Facility...

  3. 75 FR 71152 - Southern California Edison; San Onofre Nuclear Generating Station, Unit 2 and Unit 3; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-22

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Southern California Edison; San Onofre Nuclear Generating Station, Unit 2 and Unit 3; Exemption 1.0 Background Southern California Edison (SCE, the licensee) is the holder of the Facility...

  4. Thermal Modeling and Testing of the Edison Demonstration of Smallsat Networks Project

    NASA Technical Reports Server (NTRS)

    Coker, Robert

    2014-01-01

    NASA's Edison program is intending to launch the Edison Demonstration of Smallsat Networks (EDSN) project, a swarm of 8 1.5U cubesats in the fall of 2014 to demonstrate intra-swarm communications and multi-point in situ space physics data acquisition. Due to late changes in the duty cycles of various components, potential overheating issues appeared. In addition, it was determined that capacity loss due to the coldness of the batteries was unacceptable, so mitigation was required. This paper will discuss the thermal modeling, testing, and results of the EDSN mission.

  5. Reliability analysis of a utility-scale solar power plant

    NASA Astrophysics Data System (ADS)

    Kolb, G. J.

    1992-10-01

    This paper presents the results of a reliability analysis for a solar central receiver power plant that employs a salt-in-tube receiver. Because reliability data for a number of critical plant components have only recently been collected, this is the first time a credible analysis can be performed. This type of power plant will be built by a consortium of western US utilities led by the Southern California Edison Company. The 10 MW plant is known as Solar Two and is scheduled to be on-line in 1994. It is a prototype which should lead to the construction of 100 MW commercial-scale plants by the year 2000. The availability calculation was performed with the UNIRAM computer code. The analysis predicted a forced outage rate of 5.4 percent and an overall plant availability, including scheduled outages, of 91 percent. The code also identified the most important contributors to plant unavailability. Control system failures were identified as the most important cause of forced outages. Receiver problems were rated second with turbine outages third. The overall plant availability of 91 percent exceeds the goal identified by the US utility study. This paper discuses the availability calculation and presents evidence why the 91 percent availability is a credible estimate.

  6. Trial application of guidelines for nuclear plant response to an earthquake. Final report

    SciTech Connect

    Schmidt, W.; Oliver, R.; O`Connor, W.

    1993-09-01

    Guidelines have been developed to assist nuclear plant personnel in the preparation of earthquake response procedures for nuclear power plants. These guidelines are published in EPRI report NP-6695, ``Guidelines for Nuclear Plant Response to an Earthquake,`` dated December 1989. This report includes two sets of nuclear plant procedures which were prepared to implement the guidelines of EPRI report NP-6695. The first set were developed by the Toledo Edison Company Davis-Besse plant. Davis-Besse is a pressurized water reactor (PWR) and contains relatively standard seismic monitoring instrumentation typical of many domestic nuclear plants. The second set of procedures were prepared by Yankee Atomic Electric Company for the Vermont Yankee facility. This plant is a boiling water reactor (BWR) with state-of-the-art seismic monitoring and PC-based data processing equipment, software developed specifically to implement the OBE Exceedance Criterion presented in EPRI report NP-5930, ``A Criterion for Determining Exceedance of the operating Basis Earthquake.`` The two sets of procedures are intended to demonstrate how two different nuclear utilities have interpreted and applied the EPRI guidance given in report NP-6695.

  7. Rainwater collection and management from roofs at the Edison Environmental Center

    EPA Science Inventory

    In the past, the EPA’s Edison Environmental Center, a 200 acre federal run facility, directed all rainwater from roofed areas to the existing stormwater conveyance system. Over the last several years, modifications have been made to the practice of discharging stormwater to the e...

  8. EPA’s permeable pavement research and the Edison Environmental Center

    EPA Science Inventory

    A deteriorated parking area on EPA’s Edison Environmental Center needed replacement. The replacement offered an opportunity for the facility managers to reduce the impervious footprint and the reduce stormwater runoff volume. This also provided researchers from the National Risk ...

  9. 76 FR 28025 - Edison Mission Holding Beach, LLC; Notice of Petition for Declaratory Order

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-13

    ... Energy Regulatory Commission Edison Mission Holding Beach, LLC; Notice of Petition for Declaratory Order... Mission Holding Beach, LLC (EMHB) filed a petition for declaratory order requesting that the Federal...), that it will acquire from, and then lease back to their current owner, AES Huntington Beach, LLC....

  10. Confluence Is a Cure: A Reply to "Edison Is the Symptom, NCLB Is the Disease"

    ERIC Educational Resources Information Center

    Chubb, John

    2007-01-01

    This article presents a reply to "Edison Is the Symptom, NCLB Is the Disease" by Peter Campbell--a critique that portrayed the school as an exploitative environment, a veritable plantation subjugating poor minority children through mind-numbing, compliance-inducing drills. The author refutes the specific charges leveled against…

  11. Permeable Pavement Monitoring at the Edison Environmental Center Demonstration Site - presentation

    EPA Science Inventory

    The EPA’s Urban Watershed Management Branch has been monitoring an instrumented 110-space pervious pavement parking lot. The lot is used by EPA personnel and visitors to the Edison Environmental Center. The design includes 28-space rows of three permeable pavement types: asphal...

  12. Permeable Pavement Monitoring at the Edison Environmental Center Demonstration Site - Abstract

    EPA Science Inventory

    The EPA’s Urban Watershed Management Branch (UWMB) is monitoring an instrumented, working, 110-space pervious pavement parking at EPA’s Edison Environmental Center (EEC). Permeable pavement systems are classified as stormwater best management practices (BMPs) which reduce runo...

  13. The Edison Infrared Space Observatory and the Study of Extra-Solar Planetary Meterial

    NASA Technical Reports Server (NTRS)

    Thronson, H. A.; Hawarden, T. G.; Rapp, D.; Stern, S. A.

    1993-01-01

    Edison is a proposed large-aperture, radiatively-cooled space observatory planned to operate at wavelengths between 2 and 130mue or longer. Current estimates for the telescope allow an aperture of 1.7m which will achive a final equilibrium temperature of about 30 K, although use of cryo-coolers may permit temperatures below 20K.

  14. Beyond the Light Bulb: The Promise of Technology in the Edison Project.

    ERIC Educational Resources Information Center

    Hechinger, Nancy; Koch, Melissa

    1993-01-01

    Describes the Edison Project, a plan to integrate technology into schools and school systems that will support communication, collaboration, research, text and multimedia authoring and publishing, resource access and management, assessment, and administration and management services. Computer networks that link schools and external sources are…

  15. Student Achievement in Edison Schools: Mixed Results in an Ongoing Enterprise. Research Report.

    ERIC Educational Resources Information Center

    American Federation of Teachers, Washington, DC.

    A study examined student achievement in selected Edison schools through an analysis of test-score data. To qualify for the study, each school had to be in operation for more than 1 year and had to have solid student testing data from a solid evaluation design. Eight schools were selected, and their reading data were compared with those of…

  16. The Con Edison Emergency Child Care Plan for Management Employees: Summary Plan Description.

    ERIC Educational Resources Information Center

    Consolidated Edison Co., Brooklyn, NY.

    This summary plan description offers guidelines for participation in a pilot program that provides short-term emergency care for children of Con Edison managers who are under 13 years old. The plan offers professional, in-home child care that can be used when usual arrangements have collapsed. The summary plan description addresses the following…

  17. 77 FR 40914 - In the Matter of Indiana Michigan Power Company, D. C. Cook Nuclear Power Plant; Confirmatory...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-11

    ... benchmarking results; d. Performed a gap analysis and revised the FFD collector training material; e. Briefed... the CO, Indiana Michigan Power Company will develop a lessons-learned presentation of the events that.... Indiana Michigan Power Company will present these lessons learned within 180 days to all available...

  18. Edison Electric, Exxon Push Nuclear Power in Nation's Classrooms

    ERIC Educational Resources Information Center

    Feldman, Dede

    1978-01-01

    Pro-nuclear power "educational materials" designed or promoted by energy and utility companies lack objectivity about alternative energy resources. A free comic book distributed to public schools in New Mexico and a simulation game supplied to Maryland public schools at the expense of utility customers are described. (SW)

  19. DTE Energy Technologies With Detroit Edison Co. and Kinectrics Inc.: Distributed Resources Aggregation Modeling and Field Configuration Testing

    SciTech Connect

    Not Available

    2003-10-01

    Summarizes the work of DTE Energy Technologies, Detroit Edison, and Kinectrics, under contract to DOE's Distribution and Interconnection R&D, to develop distributed resources aggregation modeling and field configuration testing.

  20. 47 CFR 36.352 - Other property plant and equipment expenses-Account 6510 (Class B telephone companies); Accounts...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 2 2011-10-01 2011-10-01 false Other property plant and equipment expenses... Plant Expenses-Other § 36.352 Other property plant and equipment expenses—Account 6510 (Class B... based on the separation of Account 2001—Telecommunications Plant in Service. Network Operations Expenses...

  1. Thermal Modeling in Support of the Edison Demonstration of Smallsat Networks Project

    NASA Technical Reports Server (NTRS)

    Coker, Robert F.

    2013-01-01

    NASA's Edison program is intending to launch a swarm of at least 8 small satellites in 2013. This swarm of 1.5U Cubesats, the Edison Demonstration of Smallsat Networks (EDSN) project, will demonstrate intra-swarm communications and multi-point in-situ space physics data acquisition. In support of the design and testing of the EDSN satellites, a geometrically accurate thermal model has been constructed. Due to the low duty cycle of most components, no significant overheating issues were found. The predicted mininum temperatures of the external antennas are low enough, however, that some mitigation may be in order. The development and application of the model will be discussed in detail.

  2. Nuclear criticality safety assessment of the Consolidated Edison Uranium-Solidification Program Facility

    SciTech Connect

    Thomas, J.T.

    1984-01-01

    A nuclear criticality assessment of the Consolidated Edison Uranium-Solidification Program facility confirms that all operations involved in the process may be conducted with an acceptable margin of subcriticality. Normal operation presents no concern since subcriticality is maintained by design. Several recommendations are presented to prevent, or mitigate the consequences of, any abnormal events that might occur in the various portions of the process. These measures would also serve to reduce to a minimum the administrative controls required to prevent criticality.

  3. Public policies of a private utility: the political economics of Consolidated Edison

    SciTech Connect

    Hershkowitz, A.J.

    1986-01-01

    A fundamental assumption underlying America's private enterprise system is that as economic pressures and social values evolve, business can and will respond in an economically rational and efficient manner. Without such assistance and adaptability, a business will be unable to maintain its market. The regulatory assumptions enforcing this for electric utilities are explored in Chapter 1. In the early 1970s fuel and capital costs skyrocketed and conservation of energy and capital became an overwhelming national priority. Con Edison, which has historically depended on selling (without regard to conserving) energy to generate revenues, was forced to respond. As Chapter 2 points out, it did so by using the state and its regulatory agencies to its advantage, however incompatible with rational market economics. Chapter 3 points out that Con Edison managed to exploit its market position as a local monopolist to preclude an alternative energy system from developing. Chapter 4 raises the issue as to whether Con Edison still qualifies, primarily in economic terms, to be a given monopoly franchise over NYC's electrical grid; it goes on to analyze some utility reform measures historically considered.

  4. Industrial hygiene walk-through survey report of the Goodyear Tire and Rubber Company, Houston Chemical Plant, Houston, Texas

    SciTech Connect

    Fajen, J.M.; Ungers, L.J.

    1986-04-01

    A walk-through survey was conducted at Goodyear Tire and Rubber Company, Houston, Texas in November, 1985. The purpose of the survey was to obtain information on production processes for styrene/butadiene rubber, styrene/butadiene latex and acrylonitrile/butadiene rubber, and to evaluate the potential for 1,3-butadiene exposure.

  5. 75 FR 22771 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-30

    .... Applicants: Delmarva Power & Light Company. Description: Delmarva Power & Light Company submits Original...: Consolidated Edison Company of New York. Description: Consolidated Edison Company of New York, Inc submits...: ER10-1048-001. Applicants: Commonwealth Edison Company. Description: Commonwealth Edison...

  6. Final report on the power production phase of the 10 MW/sub e/ Solar Thermal Central Receiver Pilot Plant

    SciTech Connect

    Radosevich, L.G.

    1988-03-01

    This report describes the evaluations of the power production testing of Solar One, the 10 MW/sub e/ Solar Thermal Central Receiver Pilot Plant near Barstow, California. The Pilot Plant, a cooperative project of the US Department of Energy and utility firms led by the Southern California Edison Company, began a three year period of power production operation in August 1984. During this period, plant performance indicators, such as capacity factor, system efficiency, and availability, were studied to assess the operational capability of the Pilot Plant to reliably supply electrical power. Also studied was the long-term performance of such key plant components as the heliostats and the receiver. During the three years of power production, the Pilot Plant showed an improvement in performance. Considerable increases in capacity factor, system efficiency, and availability were achieved. Heliostat operation was reliable, and only small amounts of mirror corrosion were observed. Receiver tube leaks did occur, however, and were the main cause of the plant's unscheduled outages. The Pilot Plant provided valuable lessons which will aid in the design of future solar central receiver plants. 53 refs., 46 figs., 4 tabs.

  7. Company Town Shutdown.

    ERIC Educational Resources Information Center

    Turnage, Martha A.

    Saltville, Virginia, is a former company town whose main employer, a soda ash plant, shut down on July 1, 1971. The closure of the chemical plant displaced 700 workers, and created a crisis that threatened not only the existence of the town, but of the entire region. In response, Virginia Highlands Community College (VHCC), in cooperation with the…

  8. The Urban Watershed Research Facility, Edison, New Jersey

    EPA Science Inventory

    In an undeveloped and undisturbed environment, rainfall is naturally filtered and absorbed by soil and plants, protecting aquatic systems by slowly releasing the water to ground water and streams. In an urban setting with development and lots of impervious surfaces, natural prote...

  9. 47 CFR 36.352 - Other property plant and equipment expenses-Account 6510 (Class B telephone companies); Accounts...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... based on the separation of Account 2001—Telecommunications Plant in Service. Network Operations Expenses ... Section 36.352 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER...

  10. 75 FR 3761 - Southern Nuclear Operating Company, Inc., Edwin I. Hatch Nuclear Plant, Units 1 and 2...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-22

    ... part 73, does not involve any physical changes to the reactor, fuel, plant structures, support... part 73, ``Physical protection of plants and materials,'' for Renewed Facility Operating License Nos... FR 13967). There will be no change to radioactive effluents that affect radiation exposures to...

  11. Smart Companies.

    ERIC Educational Resources Information Center

    Galagan, Patricia A.

    1997-01-01

    Capturing and leveraging knowledge is an important new management trend that is as yet undefined. Some companies are accounting for their intellectual capital and applying it to the company balance sheets. (JOW)

  12. Interior. Apparatus used in crushing and processing plant fibers to ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Interior. Apparatus used in crushing and processing plant fibers to extract latex from the sap during experiments to find native North American plant which would yield sufficiently high percentage of latex to produce natural rubber. - Thomas A. Edison Laboratories, Building No. 2, Main Street & Lakeside Avenue, West Orange, Essex County, NJ

  13. Superfund record of decision (EPA Region 4): Helena Chemical Company, (Tampa Plant), Hillsborough County, Tampa, FL, May 7, 1996

    SciTech Connect

    1996-06-01

    The decision document (Record of Decision), presents the selected remedial action for the Helena Chemical Company Superfund Site, Tampa, Hillsborough County, Florida. This action addresses soil, sediment, and ground water contamination at the site and calls for the implementation of response measures which will protect human health and the environment. The selected remedy includes biological treatment (i.e., bioremediation) of pesticides and other site related contaminants located in surface soil sand sediments to levels appropriate for future industrial use of the Site. In addition, the selected remedy includes ground water recovery and treatment to remove pesticides and other site related contaminants.

  14. 77 FR 1667 - Nelson S. Galgoul, Av. Edison Passess 909, Rio De Janeiro, R.J., Brazil 20531-070, Respondent...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-11

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF COMMERCE Bureau of Industry and Security Nelson S. Galgoul, Av. Edison Passess 909, Rio De Janeiro, R.J., Brazil... a last known address of Av. Edison Passess 909, Rio De Janeiro, R.J., Brazil 20531-070, and...

  15. 76 FR 11521 - Prairie Island Nuclear Generating Plant, Unit 1, Northern States Power Company-Minnesota; Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-02

    ... CONTACT: Thomas J. Wengert, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission..., Plant Licensing Branch III-1, Division of Operating Reactor Licensing, Office of Nuclear Reactor... From the Federal Register Online via the Government Publishing Office NUCLEAR...

  16. 75 FR 54920 - In the Matter of Pacific Gas & Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 and 2...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-09

    ... management of the Diablo Canyon Nuclear Power Plant's design/ licensing basis which undermines PG&E's ability... Electronic Hearing Docket webpage at http://ehd1.nrc.gov/EHD/ . The time and date of the evidentiary...

  17. PREFACE: 19th International Conference on Electron Dynamics in Semiconductors, Optoelectronics and Nanostructures (EDISON'19)

    NASA Astrophysics Data System (ADS)

    González, T.; Martín-Martínez, M. J.; Mateos, J.

    2015-10-01

    The 19th International Conference on Electron Dynamics in Semiconductors, Optoelectronics and Nanostructures (EDISON'19) was held at the Hospedería Fonseca (Universidad de Salamanca, Spain), on 29 June - 2 July, 2015, and was organized by the Electronics Area from the University of Salamanca. The Conference is held biannually and covers the recent progress in the field of electron dynamics in solid-state materials and devices. This was the 19th meeting of the international conference series formerly named Hot Carriers in Semiconductors (HCIS), first held in Modena in 1973. In the edition of 1997 in Berlin the name of the conference changed to International Conference on Nonequilibrium Carrier Dynamics in Semiconductors, keeping the same acronym, HCIS; and finally in the edition of Montpellier in 2009 the name was again changed to the current one, International Conference on Electron Dynamics in Semiconductors, Optoelectronics and Nanostructures (EDISON). The latest editions took place in Santa Barbara, USA, in 2011 and Matsue, Japan, in 2013. Research work on electron dynamics involves quite different disciplines, and requires both fundamental and technological scientific efforts. Attendees to the conference come mostly from academic institutions, belonging to both theoretical and experimental groups working in a variety of fields, such as solid-state physics, electronics, optics, electrical engineering, material science, laser physics, etc. In this framework, events like the EDISON conference become a basic channel for the progress in the field. Here, researchers working in different areas can meet, present their latest advances and exchange their ideas. The program of EDISON'19 included 13 invited papers, 61 oral contributions and 73 posters. These contributions originated from scientists in more than 30 different countries. The Conference gathered 140 participants, coming from 24 different countries, most from Europe, but also with a significant participation

  18. EDISON-WMW: Exact Dynamic Programing Solution of the Wilcoxon-Mann-Whitney Test.

    PubMed

    Marx, Alexander; Backes, Christina; Meese, Eckart; Lenhof, Hans-Peter; Keller, Andreas

    2016-02-01

    In many research disciplines, hypothesis tests are applied to evaluate whether findings are statistically significant or could be explained by chance. The Wilcoxon-Mann-Whitney (WMW) test is among the most popular hypothesis tests in medicine and life science to analyze if two groups of samples are equally distributed. This nonparametric statistical homogeneity test is commonly applied in molecular diagnosis. Generally, the solution of the WMW test takes a high combinatorial effort for large sample cohorts containing a significant number of ties. Hence, P value is frequently approximated by a normal distribution. We developed EDISON-WMW, a new approach to calculate the exact permutation of the two-tailed unpaired WMW test without any corrections required and allowing for ties. The method relies on dynamic programing to solve the combinatorial problem of the WMW test efficiently. Beyond a straightforward implementation of the algorithm, we presented different optimization strategies and developed a parallel solution. Using our program, the exact P value for large cohorts containing more than 1000 samples with ties can be calculated within minutes. We demonstrate the performance of this novel approach on randomly-generated data, benchmark it against 13 other commonly-applied approaches and moreover evaluate molecular biomarkers for lung carcinoma and chronic obstructive pulmonary disease (COPD). We found that approximated P values were generally higher than the exact solution provided by EDISON-WMW. Importantly, the algorithm can also be applied to high-throughput omics datasets, where hundreds or thousands of features are included. To provide easy access to the multi-threaded version of EDISON-WMW, a web-based solution of our algorithm is freely available at http://www.ccb.uni-saarland.de/software/wtest/.

  19. Need of the regulation for profit percentage investment by pharmaceutical companies in new drug discovery research from the various local traditional medicinal and plant systems.

    PubMed

    Bhattarai, M D

    2012-01-01

    In the modern medical systems the active pharmacological ingredients, effective against any disease is identified, purified and studied for its various effects and side-effects whereas it is not so in the traditional systems. Therefore, it is not surprising that safety concerns have often been raised about the traditional medical products. The major issue now, is to make appropriate situation with basic supports to bring all the available experts and resources together for the identification, purification, and study of efficacy and safety of the active molecules of the popular traditional medicines. Government and public sectors in the countries with such rich traditional medicinal and plant systems have related experts, but they also have much hurdle regarding recruitment and retention of expert human resources, getting fund, purchase and maintenance of equipment, bureaucratic formalities and others. The pharmaceutical companies have basic laboratories with related infrastructure and human resources as well as interest about bringing the drug molecules. To bridge the gap, there is a need of the regulation which will make the pharmaceutical companies to invest certain percentage of their profit in the field of research to identify new drug molecules and to study their effects. It is just not an issue of discovering the active molecule but also of creating the concept and culture of research, purity and quality of drugs, safety of people, and future direction of the human society.

  20. 78 FR 28245 - In the Matter of Southern Nuclear Operating Company, Farley Nuclear Plant, Units 1 and 2...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-14

    ... Nuclear Plant (FNP), Units 1 and 2, in accordance with conditions specified therein. The facility is... investigation, the NRC issued a letter to FNP dated January 9, 2013, which documented an apparent violation that occurred during calendar years 2010 and 2011. Specifically, FNP Technical Specification 5.4.1.a,...

  1. 75 FR 76052 - Southern Nuclear Operating Company, Inc. Joseph M. Farley Nuclear Plant, Units 1 and 2; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-07

    .... Farley Nuclear Plant, Units 1 and 2 (FNP). The licenses provide, among other things, that the facility is... consistent with the approach set forth by the Commission as discussed in the June 4, 2009, letter. FNP... regulatory requirements of 10 CFR 73.55 for the FNP, as issued on March 27, 2009. 4.0 Conclusion for Part...

  2. Parametric study of prospective early commercial MHD power plants (PSPEC). General Electric Company, task 1: Parametric analysis

    NASA Technical Reports Server (NTRS)

    Marston, C. H.; Alyea, F. N.; Bender, D. J.; Davis, L. K.; Dellinger, T. C.; Hnat, J. G.; Komito, E. H.; Peterson, C. A.; Rogers, D. A.; Roman, A. J.

    1980-01-01

    The performance and cost of moderate technology coal-fired open cycle MHD/steam power plant designs which can be expected to require a shorter development time and have a lower development cost than previously considered mature OCMHD/steam plants were determined. Three base cases were considered: an indirectly-fired high temperature air heater (HTAH) subsystem delivering air at 2700 F, fired by a state of the art atmospheric pressure gasifier, and the HTAH subsystem was deleted and oxygen enrichment was used to obtain requisite MHD combustion temperature. Coal pile to bus bar efficiencies in ease case 1 ranged from 41.4% to 42.9%, and cost of electricity (COE) was highest of the three base cases. For base case 2 the efficiency range was 42.0% to 45.6%, and COE was lowest. For base case 3 the efficiency range was 42.9% to 44.4%, and COE was intermediate. The best parametric cases in bases cases 2 and 3 are recommended for conceptual design. Eventual choice between these approaches is dependent on further evaluation of the tradeoffs among HTAH development risk, O2 plant integration, and further refinements of comparative costs.

  3. Parametric study of prospective early Commercial MHD power plants (PSPEC). General Electric Company, task 1: Parametric analysis

    NASA Astrophysics Data System (ADS)

    Marston, C. H.; Alyea, F. N.; Bender, D. J.; Davis, L. K.; Dellinger, T. C.; Hnat, J. G.; Komito, E. H.; Peterson, C. A.; Rogers, D. A.; Roman, A. J.

    1980-02-01

    The performance and cost of moderate technology coal-fired open cycle MHD/steam power plant designs which can be expected to require a shorter development time and have a lower development cost than previously considered mature OCMHD/steam plants were determined. Three base cases were considered: an indirectly-fired high temperature air heater (HTAH) subsystem delivering air at 2700 F, fired by a state of the art atmospheric pressure gasifier, and the HTAH subsystem was deleted and oxygen enrichment was used to obtain requisite MHD combustion temperature. Coal pile to bus bar efficiencies in ease case 1 ranged from 41.4% to 42.9%, and cost of electricity (COE) was highest of the three base cases. For base case 2 the efficiency range was 42.0% to 45.6%, and COE was lowest. For base case 3 the efficiency range was 42.9% to 44.4%, and COE was intermediate. The best parametric cases in bases cases 2 and 3 are recommended for conceptual design. Eventual choice between these approaches is dependent on further evaluation of the tradeoffs among HTAH development risk, O2 plant integration, and further refinements of comparative costs.

  4. Installation of an Energeo biomass power plant at a lumber company. Technical report, 27--29 June 1995

    SciTech Connect

    Sanders, C.F.; Purvis, C.R.

    1995-06-01

    Energeo, Inc. is engaged in a demonstration test program of its AGRIPOWER 200 unit fueled with biomass at Sutton Lumber Company in Tennga, Georgia. The objective of the program is to evaluate the operating and performance characteristics of the system using lumber wastes for fuel. The program is scheduled to accumulate 800 hours of operation over a period of 1 to 2 years. The program became a reality due to initial funding from the US Department of Defense`s (DoD`s) Strategic Environmental Research and Development Program (SERDP) and the US Environmental Protection Agency`s (EPA`s) Air and Energy Engineering Research Laboratory (now referred to as National Risk Management Research Laboratory (NRMRL), Research Triangle Park). The AGRIPOWER unit operates with an open Brayton cycle using a fluid bed combustor and several heat exchangers to heat compressed air which in turn drives a turbine/generator (T/G) set. The T/G set, which includes the compressor and a recuperator, is a Solar Spartan unit packaged for this application by Alturdyne, Inc. The combustor utilizes both in-bed and freeboard combustion zones, and the above-bed zone is well mixed to provide uniform temperatures.

  5. PROCEEDINGS OF WORKSHOP ON MICROORGANISMS IN URBAN STORMWATER HELD AT EDISON, NEW JERSEY, ON MARCH 24, 1975

    EPA Science Inventory

    This workshop was held on March 29, 1975 at the USEPA Office, Edison, New Jersey. The aim was to exchange information obtained from USEPA Office of Research and Development, Storm and Combined Sewer Program sponsored projects so as to foster a better understanding of microorganis...

  6. Thomas Edison State College and Colorado State University: Using Cutting-Edge Technology to Enhance CE Unit Success

    ERIC Educational Resources Information Center

    van Zyl, Henry; Powell, Albert, Jr.

    2012-01-01

    Thomas Edison State College (TESC) and Colorado State University (CSU) offer significant contrasts in institutional culture, student demographics, faculty and institutional priorities and approaches to distance education course development and delivery. This article offers case studies showing that widely disparate program design and delivery…

  7. Three Permeable Pavements Performances for Priority Metal Pollutants and Metals associated with Deicing Chemicals from Edison Parking Lot, NJ - abstract

    EPA Science Inventory

    The U.S. Environmental Protection Agency constructed a 4000-m2 parking lot in Edison, New Jersey in 2009. The parking lot is surfaced with three permeable pavements [permeable interlocking concrete pavers (PICP), pervious concrete (PC), and porous asphalt (PA)]. Samples of each p...

  8. Three Permeable Pavements Performances for Priority Metal Pollutants and Metals Associated with Deicing Chemicals from Edison Parking Lot, NJ

    EPA Science Inventory

    The U.S. Environmental Protection Agency constructed a 4000-m2 parking lot in Edison, New Jersey in 2009. The parking lot is surfaced with three permeable pavements [permeable interlocking concrete pavers (PICP), pervious concrete (PC), and porous asphalt (PA)]. Samples of each p...

  9. SunEdison Photovoltaic Grid Integration Evaluation: Cooperative Research and Development Final Report, CRADA Number CRD-08-302

    SciTech Connect

    Kroposki, B.

    2012-09-01

    Under this Agreement, NREL will work with SunEdison to monitor and analyze the performance of photovoltaic (PV) systems as they relate to grid integration. Initially this project will examine the performance of PV systems with respect to evaluating the benefits and impacts on the electric power grid.

  10. Creating a Culture of Data Use for Continuous Improvement: A Case Study of an Edison Project School

    ERIC Educational Resources Information Center

    Sutherland, Stephanie

    2004-01-01

    In this article, I outline how, with the appropriate mix of external requirements and internal motivation, structure and capacity, a school can promote and maintain a culture of evaluative practices, specifically data use, for continuous improvement. I draw upon qualitative data conducted in a study of an Edison Project school. The findings from…

  11. Tools and data acquisition of borehole geophysical logging for the Florida Power and Light Company Turkey Point Power Plant in support of a groundwater, surface-water, and ecological monitoring plan, Miami-Dade County, Florida

    USGS Publications Warehouse

    Wacker, Michael A.

    2010-01-01

    Borehole geophysical logs were obtained from selected exploratory coreholes in the vicinity of the Florida Power and Light Company Turkey Point Power Plant. The geophysical logging tools used and logging sequences performed during this project are summarized herein to include borehole logging methods, descriptions of the properties measured, types of data obtained, and calibration information.

  12. Petition for the Administrator to Object to Operating Permit for Detroit Edison's River Rouge Power Plant

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  13. 48. MAP OF SANTA ANA RIVER POWER PLANT NO. 2 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    48. MAP OF SANTA ANA RIVER POWER PLANT NO. 2 OF THE EDISON ELECTRIC CO. THROUGH UNSURVEYED LAND IN THE SAN BERNARDINO FOREST RESERVE, APPROVED MAY 26, 1904, F. C. FINKLE, CHIEF HYDRAULIC ENGINEER. SCE drawing no. 53988. - Santa Ana River Hydroelectric System, Redlands, San Bernardino County, CA

  14. Field Demonstration of a 24-kV Superconducting Cable at Detroit Edison

    SciTech Connect

    Kelley, Nathan; Corsaro, Pietro

    2004-12-01

    Customer acceptance of high temperature superconducting (HTS) cable technology requires a substantial field demonstration illustrating both the system's technical capabilities and its suitability for installation and operation within the utility environment. In this project, the world's first underground installation of an HTS cable using existing ductwork, a 120 meter demonstration cable circuit was designed and installed between the 24 kV bus distribution bus and a 120 kV-24 kV transformer at Detroit Edison's Frisbie substation. The system incorporated cables, accessories, a refrigeration system, and control instrumentation. Although the system was never put in operation because of problems with leaks in the cryostat, the project significantly advanced the state-of-the-art in the design and implementation of Warm Dielectric cable systems in substation applications. Lessons learned in this project are already being incorporated in several ongoing demonstration projects.

  15. Fluesorbent FGD at the Burger and Lausche plants

    SciTech Connect

    Nelson, S. Jr.

    1998-04-01

    While large, capital-intensive coal-fired power plants have a number of waste-free flue gas desulfurization options available, few economical choices exist for operators of more moderately-sized industrial and institutional boilers. The Fluesorbent technology, a simple duct-injection process designed for waste-free operation and low capital costs, was designed to fill this gap. Its unique feature is the use of expanded vermiculite or perlite with the injected lime. This enables 85% SO{sub 2} removal at reasonable lime consumption rates and results in a valuable agricultural by-product, instead of a waste. A 6,500-acfm Fluesorbent pilot plant was recently tested at Ohio Edison`s Burger station with promising results. Plans are currently underway for the first permanent Fluesorbent installation on two coal-fired boilers at Ohio University`s Lausche heating plant. This paper describes the Burger plant results and the Lausche plant plans.

  16. High temperature fracturing and ductile deformation during cooling of a pluton: The Lake Edison granodiorite (Sierra Nevada batholith, California)

    NASA Astrophysics Data System (ADS)

    Pennacchioni, Giorgio; Zucchi, Eleonora

    2013-05-01

    In the Bear Creek area of the Sierra Nevada batholith, California, the high temperature postmagmatic deformation structures of the Lake Edison granodiorite include steeply-dipping orthogneiss foliations, joints, and ductile shear zones that nucleated on joints and leucocratic dykes. Exploitation of segmented joints resulted in sharply bounded, thin shear zones and in large slip gradients near the shear zone tips causing the deformation of the host rock at contractional domains. The orthogneiss foliation intensifies towards the contact with the younger Mono Creek granite and locally defines the dextral Rosy Finch Shear Zone (RFSZ), a major kilometre-wide zone crosscutting the pluton contacts. Joints predominantly strike at N70-90°E over most of the Lake Edison pluton and are exploited as sinistral shear zones, both within and outside the RFSZ. In a narrow (˜250 m thick) zone at the contact with the younger Mono Creek granite, within the RFSZ, the Lake Edison granodiorite includes different sets of dextral and sinistral shear zones/joints (the latter corresponding to the set that dominates over the rest of the Lake Edison pluton). These shear zones/joints potentially fit with a composite Y-R-R' shear fracture pattern associated with the RFSZ, or with a pattern consisting of Y-R-shear fractures and rotated T' mode I extensional fractures. The mineral assemblage of shear zones, and the microstructure and texture of quartz mylonites indicate that ductile deformation occurred above 500 °C. Joints and ductile shearing alternated and developed coevally. The existing kinematic models do not fully capture the structural complexity of the area or the spatial distribution of the deformation and magmatic structures. Future models should account more completely for the character of ductile and brittle deformation as these plutons were emplaced and cooled.

  17. Commercial low-Btu coal-gasification plant. Feasibility study: General Refractories Company, Florence, Kentucky. Volume I. Project summary. [Wellman-Galusha

    SciTech Connect

    1981-11-01

    In response to a 1980 Department of Energy solicitation, the General Refractories Company submitted a Proposal for a feasibility study of a low Btu gasification facility for its Florence, KY plant. The proposed facility would substitute low Btu gas from a fixed bed gasifier for natural gas now used in the manufacture of insulation board. The Proposal from General Refractories was prompted by a concern over the rising costs of natural gas, and the anticipation of a severe increase in fuel costs resulting from deregulation. The proposed feasibility study is defined. The intent is to provide General Refractories with the basis upon which to determine the feasibility of incorporating such a facility in Florence. To perform the work, a Grant for which was awarded by the DOE, General Refractories selected Dravo Engineers and Contractors based upon their qualifications in the field of coal conversion, and the fact that Dravo has acquired the rights to the Wellman-Galusha technology. The LBG prices for the five-gasifier case are encouraging. Given the various natural gas forecasts available, there seems to be a reasonable possibility that the five-gasifier LBG prices will break even with natural gas prices somewhere between 1984 and 1989. General Refractories recognizes that there are many uncertainties in developing these natural gas forecasts, and if the present natural gas decontrol plan is not fully implemented some financial risks occur in undertaking the proposed gasification facility. Because of this, General Refractories has decided to wait for more substantiating evidence that natural gas prices will rise as is now being predicted.

  18. 76 FR 44901 - Californians for Renewable Energy, Inc., Michael E. Boyd, Robert M. Sarvey v. California Public...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-27

    ... Commission, Pacific Gas and Electric Company Southern California Edison Company, San Diego Gas & Electric..., Pacific Gas and Electric Company, Southern California Edison Company, and San Diego Gas & Electric...

  19. Dakota Gasification Company - ammonia scrubber

    SciTech Connect

    Wallach, D.L.

    1995-12-31

    Amain stack BACT assessment for sulfur dioxide emissions conducted in 1990 for the Dakota Gasification Company`s (DGC) Great Plains Synfuels Plant identified wet limestone flue gas desulfurization system as BACT. During the development of the design specification for the wet limestone FGD, GE Environmental Systems Inc. and DGC jointly demonstrated a new ammonia-based process for flue gas desulfurization on a large pilot plant located at the Great Plains Synfuels Plant. The production of saleable ammonium sulfate, rather than a waste product, was of interest to DGC as it fit into the plant`s on-going by-product recovery efforts. With the success of the pilot plant, DGC and GEESI entered into an agreement to build the first commercial scale Ammonium Sulfate Forced Oxidation FGD system. Construction of this system is well in progress with an anticipated start-up date of August, 1996.

  20. Distributed Energy Alternative to Electrical Distribution Grid Expansion in Consolidated Edison Service Territory

    SciTech Connect

    Kingston, Tim; Kelly, John

    2008-08-01

    The nation's power grid, specifically the New York region, faces burgeoning energy demand and suffers from congested corridors and aging equipment that cost New York consumers millions of dollars. Compounding the problem is high-density buildup in urban areas that limits available space to expand grid capacity. Coincidently, these urban areas are precisely where additional power is required. DER in this study refers to combined heat and power (CHP) technology, which simultaneously generates heat and electricity at or near the point where the energy will be consumed. There are multiple CHP options available that, combined with a portfolio of other building energy efficiency (EE) strategies, can help achieve a more efficient supply-demand balance than what the grid can currently provide. As an alternative to expanding grid capacity, CHP and EE strategies can be deployed in a flexible manner at virtually any point on the grid to relieve load. What's more, utilities and customers can install them in a variety of potentially profitable applications that are more environmentally friendly. Under the auspices of the New York State Energy Research and Development Authority (NYSERDA) and the Oak Ridge National Laboratory representing the Office of Electricity of the U.S. Department of Energy, Gas Technology Institute (GTI) conducted this study in cooperation with Consolidated Edison to help broaden the market penetration of EE and DER. This study provides realistic load models and identifies the impacts that EE and DER can have on the electrical distribution grid; specifically within the current economic and regulatory environment of a high load growth area of New York City called Hudson Yards in Midtown Manhattan. These models can be used to guide new policies that improve market penetration of appropriate CHP and EE technologies in new buildings. The following load modeling scenarios were investigated: (1) Baseline: All buildings are built per the Energy Conservation

  1. 78 FR 62346 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-18

    ...: The Potomac Edison Company, PJM Interconnection, L.L.C. Description: FirstEnergy and Potomac Edison Co... Edison Company, PJM Interconnection, L.L.C. Description: FirstEnergy and Potomac Edison Co submit...

  2. Environmental quandary shuts Mohave plants

    SciTech Connect

    2006-03-15

    The 1,580 MW coal-fired Mohave Generating Station in Laughlin, NV was closed on 31 December 2005 and is expected to be closed for four years whilst the owners Southern California Edison sort out battles over the plant's pollutant emissions and negotiate with two native tribes over rights to the water needed to deliver fuel to Mohave as a slurry. The plant was forced to close because it was unable to comply with a 1999 court order to reduce emissions of sulphur dioxide, nitrogen oxides and particulates. 1 photo.

  3. Status and Progress of a Fault Current Limiting Hts Cable to BE Installed in the con EDISON Grid

    NASA Astrophysics Data System (ADS)

    Maguire, J.; Folts, D.; Yuan, J.; Henderson, N.; Lindsay, D.; Knoll, D.; Rey, C.; Duckworth, R.; Gouge, M.; Wolff, Z.; Kurtz, S.

    2010-04-01

    In the last decade, significant advances in the performance of second generation (2G) high temperature superconducting wire have made it suitable for commercially viable applications such as electric power cables and fault current limiters. Currently, the U.S. Department of Homeland Security is co-funding the design, development and demonstration of an inherently fault current limiting HTS cable under the Hydra project with American Superconductor and Consolidated Edison. The cable will be approximately 300 m long and is being designed to carry 96 MVA at a distribution level voltage of 13.8 kV. The underground cable will be installed and energized in New York City. The project is led by American Superconductor teamed with Con Edison, Ultera (Southwire and nkt cables joint venture), and Air Liquide. This paper describes the general goals, design criteria, status and progress of the project. Fault current limiting has already been demonstrated in 3 m prototype cables, and test results on a 25 m three-phase cable will be presented. An overview of the concept of a fault current limiting cable and the system advantages of this unique type of cable will be described.

  4. Customer Impact Evaluation for the 2009 Southern California Edison Participating Load Pilot

    SciTech Connect

    Gifford, William; Bodmann, Shawn; Young, Paul; Eto, Joseph H.; Laundergan, Jeremy

    2010-05-28

    The 2009 Participating Load Pilot Customer Impact Evaluation provides evidence that short duration demand response events which cycle off air conditioners for less than thirty minutes in a hot, dry environment do not lead to a significant degradation in the comfort level of residents participating in the program. This was investigated using: (1) Analysis of interval temperature data collected from inside residences of select program participants; and (2) Direct and indirect customer feedback from surveys designed and implemented by Southern California Edison at the conclusion of the program season. There were 100 indoor temperature monitors that were acquired by LBNL for this study that transmitted temperature readings at least once per hour with corresponding timestamps during the program season, June-October, 2009. Recorded temperatures were transferred from the onsite telemetry devices to a mesh network, stored, and then delivered to KEMA for analysis. Following an extensive data quality review, temperature increases during each of the thirty demand response test events were calculated for each device. The results are as follows: (1) Even for tests taking place during outside temperatures in excess of 100 degrees Fahrenheit, over 85 percent of the devices measured less than a 0.5 degree Fahrenheit temperature increase indoors during the duration of the event. (2) For the increases that were observed, none was more than 5 degrees and it was extremely rare for increases to be more than 2 degrees. At the end of the testing season SCE and KEMA designed and conducted a survey of the a facilities and public works managers and approximately 100 customers feedback survey to assess the extent the PLP events were noticed or disrupted the comfort level of participants. While only a small sampling of 3 managers and 16 customer surveys were completed, their responses indicate: (1) No customer reported even a moderate level of discomfort from the cycling-off of their air

  5. 113. JOB NO. 1347K, SHEET 2M, 1929, FORD MOTOR COMPANY; ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    113. JOB NO. 1347-K, SHEET 2M, 1929, FORD MOTOR COMPANY; BOILER HOUSE ASSEMBLY PLANT; SECTIONS - Ford Motor Company Long Beach Assembly Plant, Assembly Building, 700 Henry Ford Avenue, Long Beach, Los Angeles County, CA

  6. 114. JOB NO. 1347K, SHEET 1M, 1929, FORD MOTOR COMPANY; ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    114. JOB NO. 1347-K, SHEET 1M, 1929, FORD MOTOR COMPANY; BOILER HOUSE ASSEMBLY PLANT; PLAN - Ford Motor Company Long Beach Assembly Plant, Assembly Building, 700 Henry Ford Avenue, Long Beach, Los Angeles County, CA

  7. 115. JOB NO. 1347K, SHEET 3M, 1929/1930, FORD MOTOR COMPANY; ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    115. JOB NO. 1347-K, SHEET 3M, 1929/1930, FORD MOTOR COMPANY; BOILER HOUSE ASSEMBLY PLANT; BOILER SETTING - Ford Motor Company Long Beach Assembly Plant, Assembly Building, 700 Henry Ford Avenue, Long Beach, Los Angeles County, CA

  8. Alexander Graham Bell's Patent for the Telephone and Thomas Edison's Patent for the Electric Lamp. The Constitution Community: The Development of the Industrial United States (1870-1900).

    ERIC Educational Resources Information Center

    Schur, Joan Brodsky

    In 1876 Americans held a Centennial Exhibition in Philadelphia (Pennsylvania) to celebrate the nation's birth 100 years earlier. Machinery Hall drew the most admiration and wonder. Alexander Graham Bell exhibited the first telephone, and Thomas Alva Edison presented the automatic telegraph, one of more than 1,000 inventions he would patent in his…

  9. U.S. EPA Requires J.R. Simplot Company to Reduce Emissions at Sulfuric Acid Plant in San Joaquin Valley

    EPA Pesticide Factsheets

    Under this proposed settlement, Simplot must upgrade its pollution controls and cut harmful air pollution in half at its acid plants, bringing lasting benefits to communities in three states, said Principal Deputy Assistant Attorney General Sam Hirsch fo

  10. In-depth survey report of silica flour dust during packing, transfer, and shipping at the Central Silica Company, Glass Rock Plant, Glass Rock, Ohio

    SciTech Connect

    Caplan, P.E.; Reed, L.D.; Amendola, A.A.; Cooper, T.C.

    1981-12-01

    A visit was made to the Central Silica Company, Glass Rock, Ohio to evaluate methods used to control employee exposure to silica dust. The control methods at this company included careful handling and transfer of damp materials, exhaust ventilation, good housekeeping procedures, and the use of respiratory protection. Evaluations were made of the packing area, transfer point, inside loading trucks, and ambient air at sections of the flour building. Control systems included a good exhaust-ventilation system and four ventilation hoods. Evaluations were made of samples collected by an MSA gravimeter dust sampler, the Del High volume electrostatic precipitation, and bulk and rafter samples. Dust control methods appeared to be effective due to the existence of good engineering controls, good work practices, and an effective respiratory protection program. Additional control measures included the handling of the ore as a damp material, thus reducing the generation of dust particles. Outside dust sources were being reduced. Most of the product was shipped in bulk. Plastic wrapping was used around pallet loads to reduce bag breakage and dust dispersion. A filtered air system controlled low dust levels in the Pebble Mill control room. Enclosed screens operated under negative pressure separated fine from coarse product at the process building.

  11. 3. Credit PEM. Interior of Martinsburg plant showing two MacIntousch ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. Credit PEM. Interior of Martinsburg plant showing two MacIntousch Seymore steam engines and one Taylor steam engine belt driving (from let to right) a sperry 30 light, 220 Volt generator, a Westinghouse 900 light, 2200 Volt generator, a Ball 80 light are generator, and two Edison, 900 light, 220 Volt generators. Note switchboard to left. Photo c. 1896. - Dam No. 4 Hydroelectric Plant, Potomac River, Martinsburg, Berkeley County, WV

  12. Summary of Dissimilar Metal Joining Trials Conducted by Edison Welding Institute

    SciTech Connect

    MJ Lambert

    2005-11-18

    Under the direction of the NASA-Glenn Research Center, the Edison Welding Institute (EWI) in Columbus, OH performed a series of non-fusion joining experiments to determine the feasibility of joining refractory metals or refractory metal alloys to Ni-based superalloys. Results, as reported by EWI, can be found in the project report for EWI Project 48819GTH (Attachment A, at the end of this document), dated October 10, 2005. The three joining methods used in this investigation were inertia welding, magnetic pulse welding, and electro-spark deposition joining. Five materials were used in these experiments: Mo-47Re, T-111, Hastelloy X, Mar M-247 (coarse-grained, 0.5 mm to several millimeter average grain size), and Mar M-247 (fine-grained, approximately 50 {micro}m average grain size). Several iterative trials of each material combination with each joining method were performed to determine the best practice joining method. Mo-47Re was found to be joined easily to Hastelloy X via inertia welding, but inertia welding of the Mo-alloy to both Mar M-247 alloys resulted in inconsistent joint strength and large reaction layers between the two metals. T-111 was found to join well to Hastelloy X and coarse-grained Mar M-247 via inertia welding, but joining to fine-grained Mar M-247 resulted in low joint strength. Magnetic pulse welding (MPW) was only successful in joining T-111 tubing to Hastelloy X bar stock. The joint integrity and reaction layer between the metals were found to be acceptable. This single joining trial, however, caused damage to the electromagnetic concentrators used in this process. Subsequent design efforts to eliminate the problem resulted in a loss of power imparted to the accelerating work piece, and results could not be reproduced. Welding trials of Mar M-247 to T-111 resulted in catastrophic failure of the bar stock, even at lower power. Electro-spark deposition joining of Mo-47Re, in which the deposited material was Hastelloy X, did not have a

  13. Energy Assessment Helps Kaiser Aluminum Save Energy and Improve Productivity; DOE Software Adopted as Standard for Analyzing Plant Process Heating Systems Company-Wide

    SciTech Connect

    Not Available

    2008-07-01

    This case study describes how the Kaiser Aluminum plant in Sherman, Texas, achieved annual savings of $360,000 and 45,000 MMBtu, and improved furnace energy intensity by 11.1% after receiving a DOE Save Energy Now energy assessment and implementing recommendations to improve the efficiency of its process heating system.

  14. Fine wall (22 BWG) 90-10 and 70-30 copper-nickel condenser tube use at the Hennepin Energy Resource Company power plant

    SciTech Connect

    Helliwell, W.E.; Anderson, G.A.

    1996-12-31

    Hennepin Energy Resource Co. (HERC) has been operating its six year old 38 MW Minneapolis, MN waste to energy power plant since October, 1989 with twenty-two gage wall (22 BWG -- 0.028 in. wall) 90-10 and 70-30 copper-nickel condenser tubes. Twenty gage wall (20 BWG -- 0.035 in. wall) 90-10 and 70-30 copper-nickel tubes have been used successfully in both sea water and fresh water power plant condensers since the early 1970`s as both new construction and replacement tubes. However, this is the first, known to the authors, use of 22 BWG wall 90-10 and 70-30 copper-nickel condenser tubes in a power utility condenser although there certainly are locations where this material combination and wall thickness would make a good choice. This paper describes the plant with emphasis on the condenser and its tubes, the condensate side and water side interfaces, tube performance, and the copper-nickel alloy features.

  15. Health hazard evaluation determination report number MHETA-82-006-9002, Sewell Coal Company, Number 1 Preparation Plant, Nettie, West Virginia, VA

    SciTech Connect

    Patil, A.; Corwell, R.J.

    1982-08-01

    The potential health effects of exposure to a coal antifreeze agent, Wendon-NF-40 were examined. The study was requested by the United Mine Workers of America and was conducted on March 8, 1982 at the Sewell Coal Company No. 1 Preparation Facility (SIC-1211), Nettie, West Virginia. The antifreeze agent was sprayed on the coal as it fell from a conveyer belt into a large hopper. The spraying operation was enclosed except at one side. The preliminary on site investigation was conducted after the facility had discontinued using the antifreeze agent. Therefore, only bulk samples were collected for qualitative analysis. Workers were interviewed by a NIOSH physician. The qualitative analysis revealed that the primary component of the antifreeze was diethylene-glycol (111466). Two of 10 workers interviewed complained of health problems they felt were related to exposure to Wendon-NF-40. Their symptoms included headache and skin irritation. Due to lack of environmental sampling, NIOSH was unable to determine that a hazard from overexposure to Wendon-NF-40 existed. The authors suggest that organic vapor respirators should be worn by workers when they are in area where inhalation of the mists or sprays is likely.

  16. Petition for EPA to Object to Title V Permit Issued to Consolidated Edison for its 74th Street Plant

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  17. Petition to Object to Detroit Edison's Belle River/St. Clair Power Plant, St. Clair County, Michigan, Title V Permit

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  18. Ford and Edison in a modern regulatory environment: the first-in-human trial of night-work and artificial light.

    PubMed

    Erren, Thomas C; Shaw, David M; Wild, Ursula; Groß, J Valérie

    2017-01-01

    A thought experiment places Henry Ford and Thomas Alva Edison in a modern regulatory environment. In a utopian occupational world devoid of night-shifts or artificial light, Ford wants to experiment with "working through the night". To support Ford's project, Edison offers his patented electric lamps to "turn nights into days". An ethics committee [EC] does not approve the night-work experiment and Utopia's Food and Drug Administration [FDA] does not approve the potential medical device as safe for use by humans. According to the EC and FDA, complex effects on circadian biology and thus safety of work and light at night are not understood. The thought experiment conveys that we should pay more attention to possible risks of work and light at chronobiologically unusual times.

  19. Section 1: Company directory

    SciTech Connect

    Not Available

    1991-12-01

    This is a 1992 directory of those companies doing business in all areas of the independent power producers industry. The listing includes the company name, address, telephone and FAX numbers, and the name of a company contact. The listing is international in scope.

  20. Prime Contract Awards Alphabetically by Contractor, By State or Country, and Place, FY 84. Part 9. (Potomac Edison Company - Southern Alcohol Fuels, Inc).

    DTIC Science & Technology

    1984-01-01

    0 0.0 -, 0 -0 C0 -O -N ooo0o0r- C) 17 0 C) r, 0)’ Nqr 0 CO - -D 0000onn 01 41)CQ 00M 0 in(W 0 0000 0 CD O - -0 00000C)N ~rl- r cN if)r- ( Ir 00c0...CD CD CD CD co J0 D CD C CO -’ 7 ’ON DD to W 0 Nl ’q’ Nqr N - I-N ’j v NP N J CO 0- 00 - r-rNN - ) 000 CN( N Nl V00 0 mC) * -’CD -’< <<(<< < < <«<< 3...co04~ CO)) CD <-I (i i f 0 00000)- C0 0) N (A0)-- CD04. <~N Nqr CD-O 10 0 vCD()Iq 0 ’r0 zo - n 0)0)00 CL M004 N< I W I- IN N---------- :t t IN N - N I

  1. Order Responding to September 27, 2002 Request for the Administrator to Object to the Operating Permit for Consolidated Edison Company's Hudson Avenue Generating Station

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  2. Potential impact of the President's economic recovery plan on the electric-utility industry - with Commonwealth Edison Company serving as a case study

    SciTech Connect

    Not Available

    1982-01-01

    The objective of this study is to determine whether the President's economic recovery program (ERP) will result in a set of economic conditions which: restores the industry to its former financial health, thus allowing utilities to make investment decisions which are both cost-effective to customers, and beneficial to existing and prospective investors, or leaves the electric utility industry in a financially constrained condition. Thus requiring additional remedies if necessary investments are to be made. These additional remedies might include a restructuring of the rate regulatory process, further reductions in inflation, or a relaxation of environmental, facility licensing and other regulatory proceedings which have significantly increased utility costs. The principal conclusion to be drawn from this study is that the President's economic recovery program (ERP) will not significantly improve the electric utility industry's financial health. Thus the construction of needed generating capacity will continue to be jeopardized. The primary cause for this result is that even under the improved economic conditions associated with the ERP, costs will increase, utilities will be forced to seek increases in their electricity rates, but regulatory commissions-based on historical experience-will not grant increases of sufficient size which both: allow utilities to fully recover cost increased. Result in a significant improvement in the key measures of utility financial health.

  3. Harbor Beach Harbor Dredging and Dredged Material Disposal, Huron County, Michigan: The Detroit Edison Company Permit Application and Corps of Engineers’ Maintenance Operations.

    DTIC Science & Technology

    1981-12-01

    recharged by direct infiltration, this aquifer unit is subject to contamination from decaying organic material in the ponded areas on the west side of...State Highway M-25, contamination from seepage from barnyard areas, and contamination from fertilizers used in the cultivated areas. Also, the... contamination and the lack of local sponsorship caused the Corps to eliminate this site from consideration. c. Corps Site 4. Site 4 is a gravel pit

  4. Draft Environmental Impact Statement. Maintenance Dredging and Dredged Material Disposal Facility at Harbor Beach, Huron County, Michigan. The Detroit Edison Company Permit Application (Process Number 792253C).

    DTIC Science & Technology

    1981-01-01

    plIaced on jg r i :u.u ri la I:nd a -s t o I, uSed tha~it ver o jr t he ne xt yea r L)or ag r i cultukral pu r,,),)se s , ~ gsuggs t t ha t tne ut-edg4e...at tis report) Unclassified ISe. OECL ASSI FICATION/ DOWNGRiA HG SCHEDULE IS. DISTRIBUTION STATEMENT (of tisl Report) 17. DISTRIB3UTION STATEMENT (of...Construction and operational activities, including possible use of the proposed borrow pits for fly ash disposal, would involve temporary increases in

  5. Determining the Appropriate Package and Transportation Methodology for the Detroit Edison, Fermi II Msrs and Associated Components

    SciTech Connect

    Weber, B.

    2007-07-01

    During the spring of 2005, Detroit Edison, Enrico Fermi II Nuclear Power Station (Fermi) decided to disposition two MSRs and associated components scheduled for replacement in the spring of 2006 during the MSR Replacement Outage. Of concern to Fermi was the proper packaging and transportation methodology when dis-positioning a component measuring approximately 110' in length and 13' in diameter and weighing over 300 tons. Upon removal from the Turbine Deck the retired MSRs and associated components were turned over to the Rad Waste Group for packaging and final disposition. Fermi requested quotations from vendors to package, transport, and disposition the MSRs and associated components. However, multiple Vendors informed Fermi that the size and weight of the MSRs were questionable in passing permitting requirements and would require segmentation and volume reduction on site or at a waste processor. Fermi contracted with MHF Logistical Solutions (MHF-LS) based on their ability to receive clearances for shipping the MSRs in one piece via two heavy haul rail conveyances acting as a bolstered load with professionally engineered blocking and bracing configured to support the retired MSRs. (authors)

  6. 107. JOB NO. 1347T, SHEET IS, 1930, FORD MOTOR COMPANY; ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    107. JOB NO. 1347-T, SHEET IS, 1930, FORD MOTOR COMPANY; REINFORCEMENT OF GRAVITY TANK - Ford Motor Company Long Beach Assembly Plant, Assembly Building, 700 Henry Ford Avenue, Long Beach, Los Angeles County, CA

  7. 78 FR 23738 - Monsanto Company and Forage Genetics International (FGI); Availability of Petition for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-22

    ... Animal and Plant Health Inspection Service Monsanto Company and Forage Genetics International (FGI... Company and Forage Genetics International (FGI) seeking a determination of nonregulated status of alfalfa... Genetics International (FGI) seeking a determination of nonregulated status of alfalfa designated as...

  8. 49. OVERALL VIEW OF COMMERCIAL/INDUSTRIAL DISTRICT SHOWING SWIFT AND COMPANY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    49. OVERALL VIEW OF COMMERCIAL/INDUSTRIAL DISTRICT SHOWING SWIFT AND COMPANY MEAT PROCESSING PLANT IN CENTER FOREGROUND AND FARLEY AND LOETSCHER MANUFACTURING COMPANY WAREHOUSE ANNEX IN CENTRAL BACKGROUND. VIEW TO NORTHEAST. - Dubuque Commercial & Industrial Buildings, Dubuque, Dubuque County, IA

  9. 75 FR 5075 - Coalinga Cogeneration Company, Kern River Cogeneration Company, Mid-Set Cogeneration Company...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-01

    ...-612-000; ER10-611-000] Coalinga Cogeneration Company, Kern River Cogeneration Company, Mid-Set Cogeneration Company, Salinas River Cogeneration Company, Sargent Canyon Cogeneration Company, Sycamore Cogeneration Company; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for...

  10. Company Administration Study.

    DTIC Science & Technology

    1974-01-01

    iTRATION CENTER AND FORT BENJAMIN HARRISON FORT BENJAMIN HARRISON. INDIANA 46216 ATZI -XO 16 October 1973 SUBJECT: Letter of Instruction - Company...Mail, files, records management* publications, voting, etc.). ... AnnexA II ATZI -XO 18 October 1973 SUBJECT: Letter of Instruction - Company...administration as follows: A. 2 I * * " " " ’+ " " ’ ’ ’ ’’ ’ , ’" I ATZI -XO 18 October 1973 SUBJECT: Letter of Instruction - Company Administration Study tea

  11. Economic Potential of CHP in Detroit Edison Service Area: the Customer Perspective

    SciTech Connect

    Kelly, J.

    2003-10-10

    DOE's mission under the Distributed Energy and Electricity Reliability (DEER) Program is to strengthen America's electric energy infrastructure and provide utilities and consumers with a greater array of energy-efficient technology choices for generating, transmitting, distributing, storing, and managing demand for electric power and thermal energy. DOE recognizes that distributed energy technologies can help accomplish this mission. Distributed energy (DE) technologies have received much attention for the potential energy savings and electric power reliability assurances that may be achieved by their widespread adoption. Fueling the attention has been the desire to reduce greenhouse gas emissions and concern about easing power transmission and distribution system capacity limitations and congestion. However, these benefits may come at a cost to the electric utility companies in terms of lost revenue and other potential impacts on the distribution system. It is important to assess the costs and benefits of DE to consumers and distribution system companies. DOE commissioned this study to assess the costs and benefits of DE technologies to consumers and to better understand the effect of DE on the grid. Current central power generation units vent more waste heat (energy) than the entire transportation sector consumes and this wasted thermal energy is projected to grow by 45% within the next 20 years. Consumer investment in technologies that increase power generation efficiency is a key element of the DOE Energy Efficiency program. The program aims to increase overall cycle efficiency from 30% to 70% within 20 years as well. DOE wants to determine the impact of DE in several small areas within cities across the U.S. Ann Arbor, Michigan, was chosen as the city for this case study. Ann Arbor has electric and gas rates that can substantially affect the market penetration of DE. This case study analysis was intended to: (1) Determine what DE market penetration can

  12. 75 FR 77677 - Southern Nuclear Operating Company, Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-13

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Southern Nuclear Operating Company, Inc. Edwin I Hatch Nuclear Plant, Unit No. 2; Exemption 1.0 Background The Southern Nuclear Operating Company, Inc. (SNC, the licensee) is the holder of the...

  13. The mortality of companies

    PubMed Central

    Daepp, Madeleine I. G.; Hamilton, Marcus J.; West, Geoffrey B.; Bettencourt, Luís M. A.

    2015-01-01

    The firm is a fundamental economic unit of contemporary human societies. Studies on the general quantitative and statistical character of firms have produced mixed results regarding their lifespans and mortality. We examine a comprehensive database of more than 25 000 publicly traded North American companies, from 1950 to 2009, to derive the statistics of firm lifespans. Based on detailed survival analysis, we show that the mortality of publicly traded companies manifests an approximately constant hazard rate over long periods of observation. This regularity indicates that mortality rates are independent of a company's age. We show that the typical half-life of a publicly traded company is about a decade, regardless of business sector. Our results shed new light on the dynamics of births and deaths of publicly traded companies and identify some of the necessary ingredients of a general theory of firms. PMID:25833247

  14. UIC Class I Permit: La Paloma Generating Company, LLC

    EPA Pesticide Factsheets

    Documents related to La Paloma Generating Company, LLC's (LPGC) application for a UIC permit renewal (of permit #CA199000001) to operate a Class I injection well facility to dispose of non-hazardous wastewater from the La Paloma Generating Plant.

  15. 75 FR 13524 - Northern Natural Gas Company, Southern Natural Gas Company, Florida Gas Transmission Company, LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-22

    ... Energy Regulatory Commission Northern Natural Gas Company, Southern Natural Gas Company, Florida Gas... of Application March 16, 2010. Take notice that on March 5, 2010, Northern Natural Gas Company... other owners, Southern Natural Gas Company, Florida Gas Transmission Company, LLC, Transcontinental...

  16. 78 FR 11638 - Michigan Consolidated Gas Company, DTE Gas Company, DTE Gas Company; Notice of Petition

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-19

    ... Energy Regulatory Commission Michigan Consolidated Gas Company, DTE Gas Company, DTE Gas Company; Notice... Docket Nos. PR13-29-000, and PR13-30-000 (not consolidated), Michigan Consolidated Gas Company (MichCon) and DTE Gas Company (DTE Gas) filed to institute a name change to both itself from MichCon to DTE...

  17. JWB Companies, LLC Information Sheet

    EPA Pesticide Factsheets

    JWB Companies, LLC (the Company) is located in Jacksonville, Florida. The settlement involves renovation activities conducted at a property constructed prior to 1978, located in Jacksonville, Florida.

  18. Company profile: Athersys.

    PubMed

    Van Bokkelen, Gil

    2011-01-01

    Athersys (Nasdaq: ATHX) is a biopharmaceutical company engaged in the discovery and development of novel therapies designed to treat significant unmet medical needs. The company is heavily focused on the regenerative medicine area, with multiple clinical and preclinical stage programs. The most advanced programs at the company are focused on the development of MultiStem®, a clinical stage allogeneic stem cell therapy that has demonstrated potential for treating a range of conditions and is believed to have widespread application in the field of regenerative medicine. The company has internal programs applying MultiStem across multiple therapeutic areas including cardiovascular, neurological, immune dysfunction and other disease areas, and partnered programs with Pfizer (applying MultiStem to treat inflammatory bowel disease) and Angiotech Pharmaceuticals (acute myocardial infarction). Athersys has a broad network of collaborative relationships with leading research and clinical institutions and is committed to developing a pipeline of novel 'best-in-class' medicines.

  19. High Temperature Solid-State Coeval Brittle and Ductile Deformation during Cooling of Lake Edison Granodiorite (Sierra Nevada, California)

    NASA Astrophysics Data System (ADS)

    Pennacchioni, G.

    2009-12-01

    In the Lake Edison (LE) granodiorite (88Ma) of the Bear Creek area (Cretaceous Mono Pass intrusive suite, Sierra Nevada, CA) different sets of fractures developed during the high temperature stages of post-magmatic cooling. These fractures strongly localized successive ductile and later brittle shear deformation, but many pristine fractures do not show any shear offset (i.e. are joints). Away from the contact with the younger (86Ma) Mono Creek granite, the LE granodiorite mainly show a single dominant set of steeply dipping fractures striking around E-W to ENE-WSW which were exploited as left-handed strike-slip ductile shear zones and later as faults with identical kinematics. In the proximity of the contact, a second (dominant) set of steeply dipping fractures is present, striking about NNE-SSW, with a right-handed ductile shear reactivation and forming a conjugate array with the E-W set; many leucocratic dykes (including pegmatite) also localized the shear deformation within the granodiorite. Left-handed shear zones commonly overprint the right-handed ones, but the opposite is also observed which suggests that the two sets developed at the same time. Ductile shear zones are associated with a background solid state foliation in the host granodiorite which is mainly developed towards the contact and which has been referred to the Rosy Finch Shear Zone in the area. The mineral fabric along the foliation and along both the left- and right-handed localized shear zones indicate deformation T>500°C. The overall structural association is consistent with a regional shortening direction oriented about NW-SE. Fractures, including joints (occurring with the same orientation of the conjugate shear fractures), which form the precursory structures of shear zones, developed at the same time of ductile deformation and locally overprint the shear zones. The geometry and spatial arrangement of these precursory fractures control the patterns of ductile deformation of the host rocks

  20. 76 FR 51065 - Florida Power & Light Company; Establishment of Atomic Safety and Licensing Board

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-17

    ... COMMISSION Docket No. 50-335-LA; ASLBP No. 11-911-01-LA-BD01] Florida Power & Light Company; Establishment of... Power & Light Company (St. Lucie Plant, Unit 1) This proceeding involves a license amendment request by Florida Power & Light Company to increase, from 2,700 megawatts thermal to 3,020 megawatts thermal,...

  1. The superefficient company.

    PubMed

    Hammer, M

    2001-09-01

    Most companies do a great job promoting efficiency within their own walls, streamlining internal processes wherever possible. But they have less success coordinating cross-company business interactions. When data pass between companies, inconsistencies, errors, and misunderstandings routinely arise, leading to wasted work--for instance, the same sales, order entry, and customer data may be entered repeatedly into different systems. Typically, scores of employees at each company manage these cumbersome interactions. The costs of such inefficiencies are very real and very large. In this article, Michael Hammer outlines the activities and goals used in streamlining cross-company processes. He breaks down the approach into four stages: scoping--identifying the business process for redesign and selecting a partner; organizing--establishing a joint committee to oversee the redesign and convening a design team to implement it; redesigning--taking apart and reassembling the process, with performance goals in mind; and implementing--rolling out the new process and communicating it across the collaborating companies. The author describes how several companies have streamlined their supply-chain and product development processes. Plastics compounder Geon integrated its forecasting and fulfillment processes with those of its main supplier after watching inventories, working capital, and shipping times creep up. General Mills coordinated the delivery of its yogurt with Land O'Lakes; butter and yogurt travel cost effectively in the same trucks to the same stores. Hammer says this new kind of collaboration promises to change the traditional vocabulary of corporate relationships. What if you and I sell different products to the same customer? We're not competitors, but what are we? In the past, we didn't care. Now, we should, the author says.

  2. Fluesorbent FGD at the Burger and Lausche plants

    SciTech Connect

    Nelson, S. Jr.

    1998-07-01

    While large, capital-intensive coal-fired power plants have a number of waste-free flue gas desulfurization options available, few economical choices exist for operators of more moderately-sized industrial and institutional boilers. The Fluesorbent technology, a single duct-injection process designed for waste-free operation and low capital costs, was designed to fill this gap. Its unique feature is the use of expanded vermiculite or perlite with the injected lime. This enables 85% SO{sub 2} removal at reasonable lime consumption rates and results in a valuable agricultural by-product, instead of a waste. A 6,500-acfm Fluesorbent pilot plant was recently tested at Ohio Edison's Burger station with promising results. Plans are currently underway for the first permanent Fluesorbent installation on two coal-fired boilers at Ohio University's Lausche heating plant. This paper describes the Burger plant results and the Lausche plant plans.

  3. 9. North Plant, View of Canopied Loading Dock with Powerhouse ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. North Plant, View of Canopied Loading Dock with Powerhouse to Left, Looking Northwest - Atwater Kent Manufacturing Company, North Plant, 5000 Wissahickon Avenue, Philadelphia, Philadelphia County, PA

  4. 75 FR 11161 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-10

    .... Applicants: Carolina Power & Light Company. Description: Carolina Power & Light Company submits Substitute... 18, 2010. Docket Numbers: ER10-796-000. Applicants: Southern California Edison Company. Description: Southern California Edison Company submits Large Generator Interconnection Agreement among SES Solar...

  5. 21. ORIGINAL COMPANY HOUSE AT CORNER OF SANTA ANA AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    21. ORIGINAL COMPANY HOUSE AT CORNER OF SANTA ANA AND ANAHEIM BLVDS. (BEHIND HOUSE IN CA-242-20), WHICH IS BEING PREPARED FOR DEMOLITION. - Gene Pump Plant, South of Gene Wash Reservoir, 2 miles west of Whitsett Pump Plant, Parker Dam, San Bernardino County, CA

  6. 78 FR 17763 - Housatonic Railroad Company, Inc., Maybrook Railroad Company, and Housatonic Transportation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-22

    ... Surface Transportation Board Housatonic Railroad Company, Inc., Maybrook Railroad Company, and Housatonic Transportation Company--Intra-Corporate Family Transaction Exemption Housatonic Railroad Company, Inc. (HRRC), Maybrook Railroad Company (MRC), and Housatonic Transportation Company (HTC) (collectively,...

  7. 75 FR 49527 - General Motors Company Formerly Known as General Motors Corporation, Willow Run Transmission...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-13

    ..., Willow Run Transmission Plant Including On-Site Leased Workers From Aerotek; Ypsilanti, MI; Amended... General Motors Company, formerly known as General Motors Corporation, Willow Run Transmission Plant... location of General Motors Company, formerly known as General Motors Corporation, Willow Run...

  8. From Edison to Enron

    SciTech Connect

    Munson, Richard

    2005-11-01

    Kenneth Lay's secret partnerships and deceitful accounting certainly hurt Enron's investors, customers, and employees and tarnished his reputation, even if he's not found guilty of any crime when he goes to trial in January. Yet like Samuel Insull a century before him, Lay's trial probably won't stop the revolution he advanced within the power industry.

  9. Smart customers, dumb companies.

    PubMed

    Locke, C

    2000-01-01

    Customers today are being bombarded with an overwhelming array of choices. To alleviate customer frustration, say Steven Cristol and Peter Sealey in Simplicity Marketing, companies should stop creating new brands and product extensions. Better to consolidate product and service functions by following a four R approach: replace, repackage, reposition, and replenish. That's an outmoded, dictatorial view of markets, says Christopher Locke. Far from being stymied by choices, customers are rapidly becoming smarter than the companies that pretend to serve them. In this networked economy, people are talking among themselves, and that changes everything. Locke predicts we'll see a growing number of well-defined micromarkets--groups of customers converging in real time around entertaining and knowledgeable voices--such as NPR's car guys and the Motley Fool investment site. "Micromedia" Web sites will replace traditional advertising because they'll provide credible user-supplied news about products and services. Locke contends that an open exchange of information solves the "problem" of choice much better than manipulative strategies like simplicity or even permission marketing. Companies can participate in micromarkets through what Locke dubs "gonzo marketing." If Ford, for example, discovers that a subset of its employees are organic gardeners, it may offer support to a big independent organic-gardening Web site with donations and employee volunteers. This marketing effort would be driven not by advertising managers but by people with genuine interest in each micromarket, so it would have credibility with customers. With gonzo marketing, both companies and their markets will benefit.

  10. The Electric Company.

    ERIC Educational Resources Information Center

    Children's Television Workshop, New York, NY.

    This book is intended as an introduction to the television program, "The Electric Company," designed to help teach reading to children in grades 2-4 who are experiencing difficulty. Contents include: Sidney P. Marland, Jr.'s preface, "A Significant New Teaching Tool"; Joan Ganz Cooney's "Television and the Teaching of…

  11. What Companies Look For.

    ERIC Educational Resources Information Center

    Rosenberg, Ronald

    1985-01-01

    Examines reasons why technology companies are locating new facilities in various areas across the country. Also explains a microelectronics firm's paramount concern of selecting a site with proximity to university research and technical education, a criterion recognized as essential by industry when selecting a potential site. (DH)

  12. Review of current Southern California edison load management programs and proposal for a new market-driven, mass-market, demand-response program

    SciTech Connect

    Weller, G.H.

    2002-01-01

    Utility load management programs, including direct load control and interruptible load programs, constitute a large installed base of controllable loads that are employed by utilities as system reliability resources. In response to energy supply shortfalls expected during the summer of 2001, the California Public Utilities Commission in spring 2001 authorized new utility load management programs as well as revisions to existing programs. This report provides an independent review of the designs of these new programs for a large utility (Southern California Edison) and suggests possible improvements to enhance the price responsiveness of the customer actions influenced by these programs. The report also proposes a new program to elicit a mass-market demand response to utility price signals.

  13. Kellogg Company in Cary, N.C., Among Top Performing Energy Star Certified Manufacturers in 29 States Across the country, Energy Star manufacturing plants are leading their industries by saving energy and money, combating climate change

    EPA Pesticide Factsheets

    ATLANTA - The U.S. Environmental Protection Agency (EPA) announced today that 70 manufacturing plants have achieved Energy Star certification for their superior energy performance in 2014. Together, these manufacturing plants saved a record amount o

  14. 12 CFR 583.15 - Parent company.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Parent company. 583.15 Section 583.15 Banks and... SAVINGS AND LOAN HOLDING COMPANIES § 583.15 Parent company. The term parent company means any company which directly or indirectly controls any other company or companies....

  15. 12 CFR 583.15 - Parent company.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 5 2011-01-01 2011-01-01 false Parent company. 583.15 Section 583.15 Banks and... SAVINGS AND LOAN HOLDING COMPANIES § 583.15 Parent company. The term parent company means any company which directly or indirectly controls any other company or companies....

  16. 12 CFR 583.15 - Parent company.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 12 Banks and Banking 6 2013-01-01 2012-01-01 true Parent company. 583.15 Section 583.15 Banks and... SAVINGS AND LOAN HOLDING COMPANIES § 583.15 Parent company. The term parent company means any company which directly or indirectly controls any other company or companies....

  17. 12 CFR 583.15 - Parent company.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 12 Banks and Banking 6 2012-01-01 2012-01-01 false Parent company. 583.15 Section 583.15 Banks and... SAVINGS AND LOAN HOLDING COMPANIES § 583.15 Parent company. The term parent company means any company which directly or indirectly controls any other company or companies....

  18. 12 CFR 583.15 - Parent company.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 12 Banks and Banking 6 2014-01-01 2012-01-01 true Parent company. 583.15 Section 583.15 Banks and... SAVINGS AND LOAN HOLDING COMPANIES § 583.15 Parent company. The term parent company means any company which directly or indirectly controls any other company or companies....

  19. Company profile: tengion.

    PubMed

    Bertram, Timothy

    2009-05-01

    Founded in 2005, Tengion is a clinical-stage organ regeneration company with products in urologic, vascular and renal regeneration based on its proprietary Autologous Organ Regeneration Platform. Tengion uses biocompatible materials and a patient's own (autologous) cells to assemble neo-organs or neo-tissues that are designed to catalyze the body's innate ability to regenerate. Tengion is a fully-integrated organization, with scalable US and European manufacturing and distribution capabilities, experienced research, development, clinical and commercial teams, and significant intellectual property. The company's corporate headquarters and commercial manufacturing facility are in East Norriton, PA, USA, and its research offices, a development laboratory and a pilot manufacturing facility are located in Winston-Salem, NC, USA. Tengion's product candidates may ultimately address the most critical problems facing organ and tissue failure patients, enabling people to lead healthier lives without donor transplants or the side effects of related therapies.

  20. Multilingualism in Companies: An Introduction

    ERIC Educational Resources Information Center

    Sherman, Tamah; Strubell, Miquel

    2013-01-01

    This thematic collection of four papers explores a number of perspectives on companies in which multiple languages are used. The "organisational" perspective concerns the question of how the presence of or demand for multiple languages in the company is managed--how companies are guided by national and other policies in regard to the use…

  1. Better Plants Program Overview

    SciTech Connect

    2015-09-30

    The U.S. Department of Energy’s (DOE’s) Better Buildings, Better Plants Program is a voluntary partnership initiative to drive significant energy efficiency improvement across energy intensive companies and organizations. 157 leading manufacturers and public water and wastewater treatment utilities are partnering with DOE through Better Plants to improve energy efficiency, slash carbon emissions, and cut energy costs.

  2. Advanced dimensional inspection for the reverse engineering of power plant equipment

    SciTech Connect

    Kotteakos, B.; Ball, K.A.

    1996-12-31

    Forced outages and critical path situations often leave electric utilities with very few options other than the OEM. What does the utility do when faced with the situation of long lead time or obsolete items necessary to bring units back on-line, or off load restrictions. At Southern California Edison Company (SCE), a proactive approach to the reverse engineering and inspection process was undertaken to reduce the effects of similar situations. Advances in dimensional measurement technology have afforded the authors` company a cost effective method for obtaining the necessary inspection data to remanufacture certain items. This paper identifies equipment utilized by SCE for the reverse engineering and inspection of turbine and turbine related components and their typical applications in the power generation industry.

  3. 78 FR 70029 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-22

    ... Generation, LLC, Cleveland Electric Illuminating Company, FirstEnergy Generation Mansfield Unit 1, First..., Toledo Edison Company, West Penn Power Company, The Cleveland Electric Illuminating Company....

  4. Water hammer simulator

    SciTech Connect

    Sinha, S.K.; Madia, J.; Dixon, S.

    1995-11-01

    The Consolidated Edison Company of New York, Inc. (Con Edison) has constructed a first-of-a-kind water hammer events simulator for use at its training center. The Learning Center, Con Edison`s central training facility, intends to use the simulator as an educational tool to demonstrate the various mechanisms of the water hammer phenomenon to power plant designers, engineers and operators. The water hammer phenomenon has been studied extensively for the past 15 years for the nuclear industry. However, the acknowledge of the various water hammer mechanisms and the measures to prevent or mitigate water hammer have not been widely disseminated among the operators of fossil-fueled power plants. Con Edison personnel who operate the various generation stations and the New York City steam distribution systems are expected to benefit from the new simulator. Knowledge gained from interacting with the simulator will be very important in helping the Con Edison prevent, mitigate, or accommodate water hammer at its facilities. The water hammer simulator was fabricated in Con Edison`s central machine shop. Details of the design and construction of the simulator were finalized in consultation with Creare, Inc., an engineering research firm, located in Hanover, New Hampshire. The simulator seeks to recreate the essential features of water hammer in steam mines following the buildup of cold (subcooled) water by condensation and steam-water interaction. This paper describes the fabrication, design, testing, and operation of the Con Edison water hammer simulator. A discussion of how Con Edison plans to use the facility at The Learning Center is included.

  5. 75 FR 29750 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-27

    ... Detroit Edison Company. Description: The Detroit Edison Company submits tariff filing per 35.12: Detroit Edison--Baseline Rate Schedule Filing to be effective 5/ 21/2010. Filed Date: 05/19/2010. Accession... Wednesday, June 9, 2010. Docket Numbers: ER10-1278-000. Applicants: Southern California Edison...

  6. Southern company energy storage study :

    SciTech Connect

    Ellison, James; Bhatnagar, Dhruv; Black, Clifton; Jenkins, Kip

    2013-03-01

    This study evaluates the business case for additional bulk electric energy storage in the Southern Company service territory for the year 2020. The model was used to examine how system operations are likely to change as additional storage is added. The storage resources were allowed to provide energy time shift, regulation reserve, and spinning reserve services. Several storage facilities, including pumped hydroelectric systems, flywheels, and bulk-scale batteries, were considered. These scenarios were tested against a range of sensitivities: three different natural gas price assumptions, a 15% decrease in coal-fired generation capacity, and a high renewable penetration (10% of total generation from wind energy). Only in the elevated natural gas price sensitivities did some of the additional bulk-scale storage projects appear justifiable on the basis of projected production cost savings. Enabling existing peak shaving hydroelectric plants to provide regulation and spinning reserve, however, is likely to provide savings that justify the project cost even at anticipated natural gas price levels. Transmission and distribution applications of storage were not examined in this study. Allowing new storage facilities to serve both bulk grid and transmission/distribution-level needs may provide for increased benefit streams, and thus make a stronger business case for additional storage.

  7. 78 FR 58571 - Maine Yankee Atomic Power Company, Connecticut Yankee Atomic Power Company, and The Yankee Atomic...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-24

    ... Atomic Power Company, Connecticut Yankee Atomic Power Company, and The Yankee Atomic Electric Company... Power Company (Maine Yankee), Connecticut Yankee Atomic Power Company (Connecticut Yankee), and the Yankee Atomic Electric Company (Yankee Atomic) (together, ``licensees'' or ``the Yankee Companies'')...

  8. 40. Photocopy of a photographca. 1925 ISLAND PLANT: INTERIOR OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    40. Photocopy of a photograph--ca. 1925 ISLAND PLANT: INTERIOR OF GENERATING PLANT - American Falls Water, Power & Light Company, Island Power Plant, Snake River, below American Falls Dam, American Falls, Power County, ID

  9. 17 CFR 256.01-2 - Application to service companies doing business with nonassociate companies.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... companies doing business with nonassociate companies. 256.01-2 Section 256.01-2 Commodity and Securities... COMPANIES AND SUBSIDIARY SERVICE COMPANIES, PUBLIC UTILITY HOLDING COMPANY ACT OF 1935 General Instructions § 256.01-2 Application to service companies doing business with nonassociate companies. While...

  10. 17 CFR 256.01-2 - Application to service companies doing business with nonassociate companies.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... companies doing business with nonassociate companies. 256.01-2 Section 256.01-2 Commodity and Securities... COMPANIES AND SUBSIDIARY SERVICE COMPANIES, PUBLIC UTILITY HOLDING COMPANY ACT OF 1935 General Instructions § 256.01-2 Application to service companies doing business with nonassociate companies. While...

  11. Molecular characterization of TEM-type beta-lactamases identified in cold-seep sediments of Edison Seamount (south of Lihir Island, Papua New Guinea).

    PubMed

    Song, Jae Seok; Jeon, Jeong Ho; Lee, Jung Hun; Jeong, Seok Hoon; Jeong, Byeong Chul; Kim, Sang-Jin; Lee, Jung-Hyun; Lee, Sang Hee

    2005-04-01

    To determine the prevalence and genotypes of beta-lactamases among clones of a metagenomic library from the cold-seep sediments of Edison seamount (10,000 years old), we performed pulse-field gel electrophoresis, antibiotic susceptibility testing, pI determination, and DNA sequencing analysis. Among the 8,823 clones of the library, thirty clones produced beta-lactamases and had high levels of genetic diversity. Consistent with minimum inhibitory concentration patterns, we found that five (16.7%) of thirty clones produced an extended-spectrum beta-lactamase. 837- and 259-bp fragments specific to blaTEM genes were amplified, as determined by banding patterns of PCR amplification with designed primers. TEM-1 was the most prevalent beta-lactamase and conferred resistance to ampicillin, piperacillin, and cephalothin. TEM-116 had a spectrum that was extended to ceftazidime, cefotaxime, and aztreonam. The resistance levels conferred by the pre-antibiotic era alleles of TEM-type beta-lactamases were essentially the same as the resistance levels conferred by the TEM-type alleles which had been isolated from clinically resistant strains of bacteria of the antibiotic era. Our first report on TEM-type beta-lactamases of the pre-antibiotic era indicates that TEM-type beta-lactamases paint a picture in which most of the diversity of the enzymes may not be the result of recent evolution, but that of ancient evolution.

  12. Superfund Record of Decision (EPA Region 2): Kin-Buc Landfill, Edison Township, Middlesex County, NJ. (Second remedial action), September 1992. Final report

    SciTech Connect

    Not Available

    1992-09-28

    The 200-acre Kin-Buc Landfill consists of several inactive disposal areas and is located in Edison Township, Middlesex County, New Jersey. Land use in the area is predominantly industrial and commercial, with some residences within 2 miles north of the site. No drinking water supply wells are located within a 2-mile radius of the site. As a result of an oil spill in 1976, EPA conducted an investigation of the property. In 1980, clean-up activities were initiated under the Clean Water Act and included removal, treatment, and disposal of leachate and drummed waste. The ROD addresses a final remedy for OU2 consisting of the sediment and groundwater in the Edmonds Creek wetlands area, Mill Brook/Martins Creek, Mound B, and the low-lying area. The primary contaminants of concern affecting the sediment and ground water are VOCs, including benzene and xylenes; other organics, including PAHs, PCBs, and pesticides; and metals, including arsenic and lead. The selected remedy for the site are included.

  13. VIEW OF PELTON WATER WHEEL COMPANY (SAN FRANCISCO) TURBINE: SPEED ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW OF PELTON WATER WHEEL COMPANY (SAN FRANCISCO) TURBINE: SPEED 225 RPM, 17,500 HP. PHOTO BY JET LOWE, HAER, 1995. (Note: the dark hole in the concrete column to the left is from a tear in the negative.) - Elwha River Hydroelectric System, Glines Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA

  14. 45. FIRST FLOOR BLDG. 4, DETAIL "BIGELOW COMPANY" BOILER LOOKING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    45. FIRST FLOOR BLDG. 4, DETAIL "BIGELOW COMPANY" BOILER LOOKING NORTH. - Fafnir Bearing Plant, Bounded on North side by Myrtle Street, on South side by Orange Street, on East side by Booth Street & on West side by Grove Street, New Britain, Hartford County, CT

  15. 40. Topeka and Santa Fe Railway Company, Los Angeles, California, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    40. Topeka and Santa Fe Railway Company, Los Angeles, California, dated July 1937. (Microfiched drawings located at the Denver Service Center, #113/41906-set of 2) IMPROVEMENTS IN SEWAGE TREATMENT AND FILTER CHAMBER. - Water Reclamation Plant, Grand Canyon, Coconino County, AZ

  16. 55. SHELL OIL COMPANY FACILITIES (LEFT AND CENTER) AND CHEMICAL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    55. SHELL OIL COMPANY FACILITIES (LEFT AND CENTER) AND CHEMICAL STORAGE TANKS (RIGHT) AT NORTH EDGE OF SOUTH PLANT. VIEW TO WEST. - Rocky Mountain Arsenal, Bounded by Ninety-sixth Avenue & Fifty-sixth Avenue, Buckley Road, Quebec Street & Colorado Highway 2, Commerce City, Adams County, CO

  17. Company's Data Security - Case Study

    NASA Astrophysics Data System (ADS)

    Stera, Piotr

    This paper describes a computer network and data security problems in an existing company. Two main issues were pointed out: data loss protection and uncontrolled data copying. Security system was designed and implemented. The system consists of many dedicated programs. This system protect from data loss and detected unauthorized file copying from company's server by a dishonest employee.

  18. A strategy for company improvement.

    PubMed

    Howley, L

    2000-03-01

    Strategies based on the kaizen methodology are designed to continuously improve company performance without the need for large capital investments. This article looks at how one company used simple kaizen principles to its advantage, achieving 67% increase in productivity and 10% reduction in the standard cost of product.

  19. Assessing Your Company's Training Needs.

    ERIC Educational Resources Information Center

    Food, Drink and Tobacco Industry Training Board, Croydon (England).

    This book was designed to serve as a guide for the small and medium-sized firm establishing a systematic training pattern for the first time, and to the larger company for whom it will act as a useful check list. The guide examines the kind of information required and the ways in which actual companies have arrived at their training requirements…

  20. Order Responding to December 13, 2001 Request for the Administrator to Object to Operating Permit for Consolidated Edison Co. or NY, Inc.'s Ravenswood Steam Plant

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  1. Applicability Determination Regarding the Proposed Replacement and Reconfiguration of the High Pressure Section of Two Steam Turbines at Detroit Edison's Monroe Power Plant

    EPA Pesticide Factsheets

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  2. 25. Site plan by New Haven Water Company, c.1900 Photocopied ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    25. Site plan by New Haven Water Company, c.1900 Photocopied from property map, Mill River Division, Sheet 51, Map Collection, Armory Street Filtration Plant, New Haven Water Company, Hamden, Connecticut. - Eli Whitney Armory, West of Whitney Avenue, Armory Street Vicinity, Hamden, New Haven County, CT

  3. U.S. EPA requires Cupertino cement company to report toxic chemicals, commit to environmental projects

    EPA Pesticide Factsheets

    SAN FRANCISCO - The U.S. Environmental Protection Agency announced a settlement with Lehigh Southwest Cement Company for failing to properly report releases of toxic chemicals at its Cupertino, Calif. plant. The company is required to pay a $47,600

  4. 78 FR 29391 - Luminant Generation Company, LLC; Combined License Application for Comanche Peak Nuclear Power...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-20

    ... From the Federal Register Online via the Government Publishing Office ] NUCLEAR REGULATORY COMMISSION Luminant Generation Company, LLC; Combined License Application for Comanche Peak Nuclear Power Plant, Units 3 and 4; Exemption 1.0 Background Luminant Generation Company, LLC. (Luminant) submitted...

  5. 12 CFR 583.6 - Company.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 12 Banks and Banking 6 2013-01-01 2012-01-01 true Company. 583.6 Section 583.6 Banks and Banking... AND LOAN HOLDING COMPANIES § 583.6 Company. The term company means any corporation, partnership, trust, joint-stock company, or similar organization, but does not include: (a) The Federal Deposit...

  6. 12 CFR 583.6 - Company.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 5 2011-01-01 2011-01-01 false Company. 583.6 Section 583.6 Banks and Banking... AND LOAN HOLDING COMPANIES § 583.6 Company. The term company means any corporation, partnership, trust, joint-stock company, or similar organization, but does not include: (a) The Federal Deposit...

  7. 12 CFR 583.6 - Company.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Company. 583.6 Section 583.6 Banks and Banking... AND LOAN HOLDING COMPANIES § 583.6 Company. The term company means any corporation, partnership, trust, joint-stock company, or similar organization, but does not include: (a) The Federal Deposit...

  8. 12 CFR 246.3 - Assessed companies.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 12 Banks and Banking 4 2014-01-01 2014-01-01 false Assessed companies. 246.3 Section 246.3 Banks... (CONTINUED) SUPERVISION AND REGULATION ASSESSMENTS OF FEES (REGULATION TT) § 246.3 Assessed companies. An assessed company is any company that: (a) Is a top-tier company that, on December 31 of the...

  9. 12 CFR 583.6 - Company.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 12 Banks and Banking 6 2014-01-01 2012-01-01 true Company. 583.6 Section 583.6 Banks and Banking... AND LOAN HOLDING COMPANIES § 583.6 Company. The term company means any corporation, partnership, trust, joint-stock company, or similar organization, but does not include: (a) The Federal Deposit...

  10. 12 CFR 583.6 - Company.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 12 Banks and Banking 6 2012-01-01 2012-01-01 false Company. 583.6 Section 583.6 Banks and Banking... AND LOAN HOLDING COMPANIES § 583.6 Company. The term company means any corporation, partnership, trust, joint-stock company, or similar organization, but does not include: (a) The Federal Deposit...

  11. Brattleboro Company Takes Steps to Better Protect Public Health under EPA Settlement

    EPA Pesticide Factsheets

    A Brattleboro, Vt., company that manufactures coatings will design and install a system that captures and controls solvent vapors at its plant, ensuring that workers are protected from solvent emissions and that the environment is protected...

  12. 77 FR 66607 - Sierra Pacific Power Company, Nevada Power Company; Notice of Petition for Declaratory Order

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-06

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Sierra Pacific Power Company, Nevada Power Company; Notice of... Pacific Power Company and Nevada Power Company (Applicants) filed a petition for declaratory...

  13. 75 FR 60865 - Surety Companies Acceptable on Federal Bonds: Allied World Reinsurance Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-01

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF THE TREASURY Fiscal Service Surety Companies Acceptable on Federal Bonds: Allied World Reinsurance Company AGENCY.... 9305 to the following company: Allied World Reinsurance Company (NAIC 22730). Business Address:...

  14. 78 FR 35360 - Surety Companies Acceptable on Federal Bonds: Terminations-American Economy Insurance Company...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-12

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF THE TREASURY Fiscal Service Surety Companies Acceptable on Federal Bonds: Terminations-- American Economy Insurance Company (NAIC 19690); American States Insurance Company (NAIC 19704); General Insurance Company of...

  15. 47 CFR 32.2006 - Nonoperating plant.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Nonoperating plant. 32.2006 Section 32.2006... FOR TELECOMMUNICATIONS COMPANIES Instructions for Balance Sheet Accounts § 32.2006 Nonoperating plant... in the plant accounts as operating telecommunications plant. It shall include the...

  16. 47 CFR 32.2006 - Nonoperating plant.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 2 2011-10-01 2011-10-01 false Nonoperating plant. 32.2006 Section 32.2006... FOR TELECOMMUNICATIONS COMPANIES Instructions for Balance Sheet Accounts § 32.2006 Nonoperating plant... in the plant accounts as operating telecommunications plant. It shall include the...

  17. 47 CFR 32.2006 - Nonoperating plant.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 2 2013-10-01 2013-10-01 false Nonoperating plant. 32.2006 Section 32.2006... FOR TELECOMMUNICATIONS COMPANIES Instructions for Balance Sheet Accounts § 32.2006 Nonoperating plant... in the plant accounts as operating telecommunications plant. It shall include the...

  18. 47 CFR 32.2006 - Nonoperating plant.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 2 2012-10-01 2012-10-01 false Nonoperating plant. 32.2006 Section 32.2006... FOR TELECOMMUNICATIONS COMPANIES Instructions for Balance Sheet Accounts § 32.2006 Nonoperating plant... in the plant accounts as operating telecommunications plant. It shall include the...

  19. 47 CFR 32.2006 - Nonoperating plant.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 2 2014-10-01 2014-10-01 false Nonoperating plant. 32.2006 Section 32.2006... FOR TELECOMMUNICATIONS COMPANIES Instructions for Balance Sheet Accounts § 32.2006 Nonoperating plant... in the plant accounts as operating telecommunications plant. It shall include the...

  20. Technical evaluation report on the Third 10-year Interval Inservice Inspection Program Plan: Florida Power and Light Company, Turkey Point Nuclear Power Plant, Units 3 and 4 (Docket Numbers 50-250 and 50-251)

    SciTech Connect

    Brown, B.W.; Feige, E.J.; Galbraith, S.G.; Porter, A.M.

    1995-02-01

    This report presents the results of the evaluation of the Turkey Point Nuclear Power Plant, Units 3 and 4, Third 10-Year Interval Inservice Inspection Program Plan, Revision 0, submitted September 9, 1993, including the requests for relief from the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section XI, requirements that the licensee has determined to be impractical. The Turkey Point Nuclear Power Plant, Units 3 and 4, Third 10-Year Interval Inservice Inspection Program Plan is evaluated in Section 2 of this report. The inservice inspection (ISI) program plan is evaluated for (a) compliance with the appropriate edition/addenda of Section XI, (b) acceptability of the examination sample, (c) correctness of the application of system or component examination exclusion criteria, and (d) compliance with ISI-related commitments identified during previous Nuclear Regulatory Commission (NRC) reviews. The requests for relief are evaluated in Section 3 of this report.

  1. 26 CFR 1.831-1 - Tax on insurance companies (other than life or mutual), mutual marine insurance companies, and...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... mutual), mutual marine insurance companies, and mutual fire insurance companies issuing perpetual... insurance companies (other than life or mutual), mutual marine insurance companies, and mutual fire... marine insurance companies and mutual fire insurance companies exclusively issuing either...

  2. 77 FR 8956 - Surety Companies Acceptable on Federal Bonds: Grange Mutual Casualty Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-15

    ... Fiscal Service Surety Companies Acceptable on Federal Bonds: Grange Mutual Casualty Company AGENCY.... 9305 to the following company: Grange Mutual Casualty Company (NAIC 14060). Business Address: 671 South... long as the companies remain qualified (see 31 CFR part 223). A list of qualified companies...

  3. 75 FR 22689 - Surety Companies Acceptable on Federal Bonds: Regent Insurance Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-29

    ... Fiscal Service Surety Companies Acceptable on Federal Bonds: Regent Insurance Company AGENCY: Financial... following company: Regent Insurance Company (NAIC 24449) Business Address: One General Drive, Sun Prairie... renewal as long as the companies remain qualified (see 31 CFR part 223). A list of qualified companies...

  4. 75 FR 11228 - Surety Companies Acceptable On Federal Bonds: Manufacturers Alliance Insurance Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-10

    ... Fiscal Service Surety Companies Acceptable On Federal Bonds: Manufacturers Alliance Insurance Company....C. 9305 to the following company: Manufacturers Alliance Insurance Company (NAIC 36897). Business... tong as the companies remain qualified ] (see 31 CFR part 223). A list of qualified companies...

  5. 75 FR 11228 - Surety Companies Acceptable on Federal Bonds: Pennsylvania Manufacturers Indemnity Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-10

    ... Fiscal Service Surety Companies Acceptable on Federal Bonds: Pennsylvania Manufacturers Indemnity Company....C. 9305 to the following company: Pennsylvania Manufacturers Indemnity Company (NAIC 41424... renewal as long as the companies remain qualified (see 31 CFR part 223). A list of qualified companies...

  6. US prep plant census 2008

    SciTech Connect

    Fiscor, S.

    2008-10-15

    Each year Coal Age conducts a fairly comprehensive survey of the industry to produce the US coal preparation plant survey. This year's survey shows how many mergers and acquisitions have given coal operators more coal washing capacity. The plants are tabulated by state, giving basic details including company owner, plant name, raw feed, product ash %, quality, type of plant builder and year built. 1 tab., 1 photo.

  7. Joints, shear fractures and ductile shear zones in a cooling pluton: the example of the Lake Edison Granodiorite (Sierra Nevada, California)

    NASA Astrophysics Data System (ADS)

    Pennacchioni, Giorgio

    2010-05-01

    In the Lake Edison (LE) granodiorite (88Ma) of the Bear Creek area (Cretaceous Mono Pass intrusive suite, Sierra Nevada, CA) different sets of fractures developed during the high temperature stages of post-magmatic cooling. These fractures strongly localized successive ductile and later brittle shear deformation, but many pristine fractures do not show any shear offset (i.e. are joints). Away from the contact with the younger (86Ma) Mono Creek granite, the LE granodiorite mainly show a single dominant set of steeply dipping fractures striking around E-W to ENE-WSW which were exploited as left-handed strike-slip ductile shear zones and later as faults with identical kinematics. In the proximity of the contact, a second (dominant) set of steeply dipping fractures is present, striking about NNE-SSW, with a right-handed ductile shear reactivation and forming a conjugate array with the E-W set; many leucocratic dykes (including pegmatite) also localized the shear deformation within the granodiorite. Left-handed shear zones and the precursory joint/fractures commonly overprint the right-handed ones, but the opposite is also observed. The two conjugate sets of ductile shear zones are associated with a background solid state foliation in the host granodiorite which is mainly developed towards the pluton contact and which has been referred to the Rosy Finch Shear Zone in the area. The attitude of the foliation is orthogonal to the bisector of the small angle between the two sets of joints/fractures/ductile shears. The mineral fabric along the foliation and along both the left- and right-handed localized shear zones indicate deformation T>500°C. This suggests that all the structures are coeval developing under the same stress field and that joints actually develop in an orientation typical of shear fractures.

  8. Eastern Kodak Company

    SciTech Connect

    Y.S. Tyan

    2009-06-30

    Lighting consumes more than 20% of electricity generated in the United States. Solid state lighting relies upon either inorganic or organic light-emitting diodes (OLEDs). OLED devices because of their thinness, fast response, excellent color, and efficiency could become the technology of choice for future lighting applications, provided progress is made to increase power efficiency and device lifetime and to develop cost-effective manufacturing processes. As a first step in this process, Eastman Kodak Company has demonstrated an OLED device architecture having an efficacy over 50 lm/W that exceeds the specifications of DOE Energy Star Program Requirements for Solid State Lighting. The project included work designed to optimize an OLED device, based on a stacked-OLED structure, with performance parameters of: low voltage; improved light extraction efficiency; improved internal quantum efficiency; and acceptable lifetime. The stated goal for the end of the project was delivery of an OLED device architecture, suitable for development into successful commercial products, having over 50 lum/W power efficiency and 10,000 hours lifetime at 1000 cd/m{sup 2}. During the project, Kodak developed and tested a tandem hybrid IES device made with a fluorescent blue emitter, a phosphorescent yellow emitter, and a phosphorescent red emitter in a stacked structure. The challenge was to find low voltage materials that do not absorb excessive amounts of emitted light when the extraction enhancement structure is applied. Because an extraction enhancement structure forces the emitted light to travel several times through the OLED layers before it is emitted, it exacerbates the absorption loss. A variety of ETL and HTL materials was investigated for application in the low voltage SSL device structure. Several of the materials were found to successfully yield low operating device voltages without incurring excessive absorption loss when the extraction enhancement structure was applied

  9. 78 FR 62358 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-21

    ... California Edison Company. Description: Correction to August 26, 2013 Offer of Settlement of Southern California Edison Company. Filed Date: 10/9/13. Accession Number: 20131009-5160. Comments Due: 5 p.m. ET...

  10. [Quality control of plant extract].

    PubMed

    Shao, Yun-dong; Gao, Wen-yuan; Liu, Dan; Jia, Wei; Duan, Hong-Quan; Zhang, Tie-jun

    2003-10-01

    The current situation of plant extract in domestic and international market was analyzed in the paper. The quality control of 20 plant extracts which have reasonably good sales in USA market was compared and analyzed. The analysis of the quality control of six plant extracts indicated that there were two main reasons leading to the varied quality specifications among different suppliers. One reason was that the plant species utilized by different companies were different. The other reason was that the extraction processes were different among different production plants. Comparing with the significant international suppliers of plant extracts, the product quality of Chinese companies were not satisfactory. It was suggested that chromatography and chromatographic fingerprint techniques should be applied to improve the quality control standard of plant extract in our country.

  11. [INDENA SPA company's patent portfolio of Ginkgo biloba preparation].

    PubMed

    Wang, Nan; Guo, Kai; Cheng, Xin-min; Liu, Wei

    2015-10-01

    INDENA SPA Company in Italy is a multi-national company that produces and sells plant extracts. Based on its own re- search advantages in the field of Ginkgo biloba preparation, the company protects its own products market effectively through building patent portfolio around the patents of its opponent. Based on the multi-angle analysis for patent portfolio of G. biloba preparation from the aspects of application time, legal status, technical development route, and patent portfolio layout, this article provides technical reference on research and development of G. biloba preparation, and the author suggest that Chinese applicants learn techniques and layout experiences of other patents fully to enhance the level of research and patent protection level.

  12. The Overnight Scentsation Rose Plant

    NASA Technical Reports Server (NTRS)

    1998-01-01

    International Flavors and Fragrances Inc., is a company that creates and manufactures flavors, fragrances and aroma chemicals. The Overnight Scentsation rose plant will be housed aboard NASA's shuttle flight STS-95 in a specially-designed structure under ultraviolet lights. The flowering plant was brought to Cape Canaveral from its home at IFF's greenhouse in Union Beach, New Jersey.

  13. How to Analyze Company Using Social Network?

    NASA Astrophysics Data System (ADS)

    Palus, Sebastian; Bródka, Piotr; Kazienko, Przemysław

    Every single company or institution wants to utilize its resources in the most efficient way. In order to do so they have to be have good structure. The new way to analyze company structure by utilizing existing within company natural social network and example of its usage on Enron company are presented in this paper.

  14. 75 FR 76452 - ConocoPhillips Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-08

    ... Energy Regulatory Commission ConocoPhillips Company v. Enterprise TE Products Pipeline Company LLC... (ICA), ConocoPhillips Company (ConocoPhillips or Complainant) filed a complaint against Enterprise TE Products Pipeline Company LLC (Enterprise TEPPCO or Respondent) alleging that Enterprise TEPPCO has...

  15. Planting Seeds, Growing Diversity

    ERIC Educational Resources Information Center

    Hua, Vanessa

    2011-01-01

    Last year, when students at Ridgecrest Intermediate School in Palos Verdes, California, were asked to name scientists, their answers--Benjamin Franklin, Thomas Edison, Albert Einstein, Bill Nye the Science Guy--reflected a common perception. Most of the leading scientists they came up with were white, male, or dead. Although women and people of…

  16. Minnesota Mining and Manufacturing Company's hazardous waste program.

    PubMed

    Van Noordwyk, H J; Santoro, M A

    1978-12-01

    This paper discusses the present hazardous waste program of 3M Company (Minnesota Mining and Manufacturing Company). 3M's definition of hazardous waste and the company's position on hazardous waste disposal are first considered. The company position is that wherever and whenever the disposal of a waste material threatens the environment or public safety, then that waste should be considered a hazardous waste and treated accordingly in terms of its handling and ultimate disposal. The generation of hazardous wastes and the differentiation of "hazardous" and "nonhazardous" wastes are described next. Handling of hazardous wastes from their generation to their disposal is then covered. This includes a definition of internal 3M terminology and a description of the hazard rating system used by the company. Finally, 3M disposal practices are presented. It is 3M's position that thermal destruction of hazardous wastes, where appropriate, is the best method for their disposal. With this in mind, 3M has constructed incineration facilities throughout the country. The rotary kiln incinerator at the 3M Chemolite plant in Cottage Grove, Minnesota is briefly described. Disposal of certain hazardous wastes in controlled secure land disposal sites is then briefly discussed.

  17. 77 FR 25349 - Mutual Insurance Holding Company Treated as Insurance Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-30

    ... 380 RIN 3064-AD89 Mutual Insurance Holding Company Treated as Insurance Company AGENCY: Federal... (``Final Rule'') that treats a mutual insurance holding company as an insurance company for purposes of...''). The Final Rule clarifies that the liquidation and rehabilitation of a covered financial company...

  18. 77 FR 25536 - Surety Companies Acceptable On Federal Bonds: Endurance American Insurance Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-30

    ... Fiscal Service Surety Companies Acceptable On Federal Bonds: Endurance American Insurance Company AGENCY.... 9305 to the following company: Endurance American Insurance Company (NAIC 10641). Business Address: 333... subsequent annual renewal as long as the companies remain qualified (see 31 CFR part 223). A list...

  19. 78 FR 19366 - Surety Companies Acceptable on Federal Bonds: Ohio Security Insurance Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-29

    ... Fiscal Service Surety Companies Acceptable on Federal Bonds: Ohio Security Insurance Company AGENCY.... 9305 to the following company: Ohio Security Insurance Company (NAIC 24082). BUSINESS ADDRESS: 62 Maple... subject to subsequent annual renewal as long as the companies remain qualified (see 31 CFR part 223)....

  20. 76 FR 77591 - Surety Companies Acceptable on Federal Bonds: Aspen American Insurance Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-13

    ... Fiscal Service Surety Companies Acceptable on Federal Bonds: Aspen American Insurance Company AGENCY.... 9305 to the following company: Aspen American Insurance Company (NAIC 43460). Business Address: 175... subject to subsequent annual renewal as long as the companies remain qualified (see 31 CFR part 223)....

  1. 75 FR 61246 - Surety Companies Acceptable on Federal Bonds: Darwin National Assurance Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-04

    ... Fiscal Service Surety Companies Acceptable on Federal Bonds: Darwin National Assurance Company AGENCY.... 9305 to the following company: Darwin National Assurance Company (NAIC 16624). Business Address: 9 Farm... subsequent annual renewal as long as the companies remain qualified ] (see 31 CFR part 223). A list...

  2. 75 FR 14436 - Ameren Corporation, Illinois Power Company, Central Illinois Light Company, Central Illinois...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-25

    ... Energy Regulatory Commission Ameren Corporation, Illinois Power Company, Central Illinois Light Company, Central Illinois Public Service Company, Ameren Energy Resources Company, LLC, AmerenEnergy Resources Generating Company; Notice of Filing March 18, 2010. Take notice that on March 15, 2010, Ameren...

  3. 76 FR 77442 - Mutual Insurance Holding Company Treated as Insurance Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-13

    ... CORPORATION 12 CFR Part 380 RIN 3064-AD89 Mutual Insurance Holding Company Treated as Insurance Company AGENCY... insurance holding company as an insurance company for the purpose of Section 203(e) of the Dodd-Frank Wall... clarifies that the liquidation and rehabilitation of a covered financial company that is a mutual...

  4. 77 FR 8956 - Surety Companies Acceptable on Federal Bonds: Integrity Mutual Insurance Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-15

    ... Fiscal Service Surety Companies Acceptable on Federal Bonds: Integrity Mutual Insurance Company AGENCY.... 9305 to the following company: Integrity Mutual Insurance Company (NAIC 14303). Business Address: P.O... Certificates are subject to subsequent annual renewal as long as the companies remain qualified (see 31...

  5. 78 FR 15123 - Surety Companies Acceptable On Federal Bonds: Atlantic Specialty Insurance Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-08

    ... Fiscal Service Surety Companies Acceptable On Federal Bonds: Atlantic Specialty Insurance Company AGENCY.... 9305 to the following company: Atlantic Specialty Insurance Company (NAIC 27154). BUSINESS ADDRESS: 150... Certificates are subject to subsequent annual renewal as long as the companies remain qualified (see 31...

  6. 78 FR 42061 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-15

    ... California Edison Company. Description: IFA and Distribution Service Agreement with Wildflower Energy to be...: ER13-1894-000. Applicants: Southern California Edison Company. Description: Amended Serv Agmt with San...: ER13-1899-000. Applicants: Southern California Edison Company. Description: IFA and...

  7. 78 FR 13335 - Combined Notice of Filings #2

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-27

    .... Applicants: Southern California Edison Company. Description: Revised Added Facilities Rate for Agmts under... Due: 5 p.m. ET 3/12/13. Docket Numbers: ER13-950-000. Applicants: Southern California Edison Company.... Applicants: Southern California Edison Company. Description: Revised Added Facilities Rate for Agmts...

  8. 75 FR 53297 - Supplemental Notice Regarding Staff Technical Conference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-31

    ... Express LLC, 21st Docket No. EL10-76-000. Century Transmission Holdings, LLC. Southern California Edison Company.. Docket Nos. ER10-732-000, ER10-732-001. Southern California Edison Company.. Docket Nos. EL10-1-000, EL10-1-001, EL10-1-002. Southern California Edison Company.. Docket Nos. ER10-796-000,...

  9. 75 FR 26216 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-11

    ... Light Fuel & Power Company, Black Hills Wyoming, LLC Description: Notification of Change in Status of.... Applicants: Consolidated Edison Company of New York, Inc. Description: Consolidated Edison Company of New York, Inc. submits amendment to Con Edison's Delivery rate Schedule 96 and amendments to Con...

  10. 75 FR 39284 - Southern Nuclear Operating Company et al.; Notice of Availability of Environmental Assessment and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-08

    ... Operating Company et al., for Vogtle Electric Generating Plant ESP Site Located In Burke County, GA AGENCY... Commission (NRC) is considering issuance of an amendment to Early Site Permit (ESP) No. ESP-004, issued on..., Georgia), for the Vogtle Electric Generating Plant (VEGP) ESP site located in Burke County, Georgia....

  11. Berkeley Pact with a Swiss Company Takes Technology Transfer to a New Level.

    ERIC Educational Resources Information Center

    Blumenstyk, Goldie

    1998-01-01

    In search of increased support for graduate students in plant science and upgraded laboratories, the College of Plant and Microbial Biology, University of California Berkeley, offered the college's expertise in exchange for major financial backing from the single company making the best offer. The resulting five-year, $25-million alliance with one…

  12. CALCIUM CHLORIDE PLANT LOOKING EAST. CALCIUM CHLORIDE BUILDING IN CENTER, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    CALCIUM CHLORIDE PLANT LOOKING EAST. CALCIUM CHLORIDE BUILDING IN CENTER, CALCIUM CHLORIDE STORAGE BUILDING ON RIGHT WITH SA (SODA ASH) BUILDING IN RIGHT BACKGROUND. - Solvay Process Company, Calcium Chloride Plant, Between Willis & Milton Avenues, Solvay, Onondaga County, NY

  13. 2. View of Liquified Propane Air Plant (New), former Exhaust ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. View of Liquified Propane Air Plant (New), former Exhaust and Compressor Building and former Purifying Plant in background. - Concord Gas Light Company, South Main Street, Concord, Merrimack County, NH

  14. 12. EAST PLANT ELEVATION, CRANE, CORNER OF DIKE, AND CORNER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. EAST PLANT ELEVATION, CRANE, CORNER OF DIKE, AND CORNER OF SHOP LOOKING SOUTH. - Ford Motor Company Long Beach Assembly Plant, Assembly Building, 700 Henry Ford Avenue, Long Beach, Los Angeles County, CA

  15. 10. SOUTHEAST CORNER OF PLANT, LOOKING NORTH ALONG DIKE. NOTE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. SOUTHEAST CORNER OF PLANT, LOOKING NORTH ALONG DIKE. NOTE OIL HOUSE FOUNDATIONS AT LOWER LEFT. - Ford Motor Company Long Beach Assembly Plant, Assembly Building, 700 Henry Ford Avenue, Long Beach, Los Angeles County, CA

  16. 5. INTERIOR DETAIL OF CRUSHING PLANT (FEATURE 19), SECOND FLOOR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. INTERIOR DETAIL OF CRUSHING PLANT (FEATURE 19), SECOND FLOOR FACING EAST. - Copper Canyon Camp of the International Smelting & Refining Company, Crushing Plant, Copper Canyon, Battle Mountain, Lander County, NV

  17. 7. INTERIOR DETAIL OF CRUSHING PLANT (FEATURE 19), GROUND LEVEL, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. INTERIOR DETAIL OF CRUSHING PLANT (FEATURE 19), GROUND LEVEL, FACING NORTH. REMAINS OF CONVEYOR BELT VISIBLE AT BOTTOM RIGHT. - Copper Canyon Camp of the International Smelting & Refining Company, Crushing Plant, Copper Canyon, Battle Mountain, Lander County, NV

  18. 8. INTERIOR DETAIL OF CRUSHING PLANT (FEATURE 19), FACING SOUTHSOUTHWEST. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. INTERIOR DETAIL OF CRUSHING PLANT (FEATURE 19), FACING SOUTH-SOUTHWEST. - Copper Canyon Camp of the International Smelting & Refining Company, Crushing Plant, Copper Canyon, Battle Mountain, Lander County, NV

  19. 7. August, 1971. GV FROM POWER PLANT TO PENSTOCKS & ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. August, 1971. GV FROM POWER PLANT TO PENSTOCKS & PRESSURE HOUSE ON MOUNTAINSIDE. - Telluride Power Company, Olmsted Hydroelectric Plant, mouth of Provo River Canyon West of U.S. Route 189, Orem, Utah County, UT

  20. 29. ISLAND PLANT: INTERIOR VIEW LOOKING SOUTHWEST ON GROUND FLOOR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    29. ISLAND PLANT: INTERIOR VIEW LOOKING SOUTHWEST ON GROUND FLOOR - American Falls Water, Power & Light Company, Island Power Plant, Snake River, below American Falls Dam, American Falls, Power County, ID

  1. 36. ISLAND PLANT: Nos. 1 AND 2 TWENTYSIX INCH HORIZONTAL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    36. ISLAND PLANT: Nos. 1 AND 2 TWENTY-SIX INCH HORIZONTAL SAMSON TURBINES - American Falls Water, Power & Light Company, Island Power Plant, Snake River, below American Falls Dam, American Falls, Power County, ID

  2. 50. EASTSIDE PLANT: GENERAL VIEW OF GENERATOR EXCITER AND CONTROL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    50. EASTSIDE PLANT: GENERAL VIEW OF GENERATOR EXCITER AND CONTROL MECHANISM - American Falls Water, Power & Light Company, Island Power Plant, Snake River, below American Falls Dam, American Falls, Power County, ID

  3. 9. GENERAL VIEW OF ISLAND PLANT LOOKING NORTH (negative reversed) ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. GENERAL VIEW OF ISLAND PLANT LOOKING NORTH (negative reversed) - American Falls Water, Power & Light Company, Island Power Plant, Snake River, below American Falls Dam, American Falls, Power County, ID

  4. 37. ISLAND PLANT: Nos. 1 AND 2 TWENTYSIX INCH SPECIAL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    37. ISLAND PLANT: Nos. 1 AND 2 TWENTY-SIX INCH SPECIAL HORIZONTAL SAMSON TURBINE (RIVITED CASE) - American Falls Water, Power & Light Company, Island Power Plant, Snake River, below American Falls Dam, American Falls, Power County, ID

  5. 53. EASTSIDE PLANT: GENERAL VIEW OF GENERATOR, EXCITER, GOVERNOR, AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    53. EASTSIDE PLANT: GENERAL VIEW OF GENERATOR, EXCITER, GOVERNOR, AND CONTROL MECHANISM - American Falls Water, Power & Light Company, Island Power Plant, Snake River, below American Falls Dam, American Falls, Power County, ID

  6. 7. ISLAND PLANT AND HORSESHOE DAM FROM WEST BANK (negative ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. ISLAND PLANT AND HORSESHOE DAM FROM WEST BANK (negative reversed) - American Falls Water, Power & Light Company, Island Power Plant, Snake River, below American Falls Dam, American Falls, Power County, ID

  7. 52. EASTSIDE PLANT: GENERAL VIEW OF GOVERNOR ADJACENT TO GENERATOR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    52. EASTSIDE PLANT: GENERAL VIEW OF GOVERNOR ADJACENT TO GENERATOR - American Falls Water, Power & Light Company, Island Power Plant, Snake River, below American Falls Dam, American Falls, Power County, ID

  8. 17. Photocopy of a photograph1921 EASTSIDE PLANT LOOKING NORTHEAST ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. Photocopy of a photograph--1921 EASTSIDE PLANT LOOKING NORTHEAST - American Falls Water, Power & Light Company, Island Power Plant, Snake River, below American Falls Dam, American Falls, Power County, ID

  9. 3. VIEW OF CRUSHING PLANT (FEATURE 19), FACING NORTH. HEADFRAME ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. VIEW OF CRUSHING PLANT (FEATURE 19), FACING NORTH. HEADFRAME AND STORAGE TANKS (FEATURE 18) VISIBLE IN THE BACKGROUND. - Copper Canyon Camp of the International Smelting & Refining Company, Crushing Plant, Copper Canyon, Battle Mountain, Lander County, NV

  10. Southwestern Public Service Company Solar Repowering Program. Volume II. Appendixes. Final technical report

    SciTech Connect

    Not Available

    1980-07-01

    A design study for repowering the Southwestern Public Service Company's Plant X with a 60 MWe liquid sodium tower focus power plant is presented. This volume contains the appendices: (A) system requirements specification for the Southwestern Public Service Company solar repowering; (B) sodium pressure drop calculations; (C) calculation of auxiliary power requirements; (D) utility system production costing-monthly production simulation program; (E) absorber panel tube joint analysis; (F) repowering panel tube joint analysis; (G) electromagnetic/centrifugal pump tradeoff study; (H) report of X-3 reheater test; (I) example screening curve computation and solar repowering plant busbar cost; (J) loss-of-load probability methodology and solar thermal-electric plant capacity credit; (K) helical coil steam generator evaluation; and (L) Southwestern Public Service Company solar repowering community endorsements. (WHK)

  11. H.R. 432: A Bill to amend chapter 601 of title 49, United States Code, to improve natural gas and hazardous liquid pipeline safety, in response to the natural gas pipeline accident in Edison, New Jersey, and for other purposes. Introduced in the House of Representatives, One Hundred Fourth Congress, First session

    SciTech Connect

    1995-12-31

    This document contains H.R. 432, A Bill to amend chapter 601 of title 49, United States Code, to improve natural gas and hazardous liquid pipeline safety, in response to the natural gas pipeline accident in Edison, New Jersey, and for other purposes. This Bill was introduced in the House of Representatives, 104th Congress, First Session, January 5, 1995.

  12. Natural gas annual 1993 supplement: Company profiles

    SciTech Connect

    Not Available

    1995-02-01

    The Natural Gas Annual provides information on the supply and disposition of natural gas to a wide audience including industry, consumers, Federal and State agencies, and educational institutions. This report, the Natural Gas Annual 1993 Supplement: Company Profiles, presents a detailed profile of 45 selected companies in the natural gas industry. The purpose of this report is to show the movement of natural gas through the various States served by the companies profiled. The companies in this report are interstate pipeline companies or local distribution companies (LDC`s). Interstate pipeline companies acquire gas supplies from company owned production, purchases from producers, and receipts for transportation for account of others. Pipeline systems, service area maps, company supply and disposition data are presented.

  13. 76 FR 58263 - Kenai Pipe Line Company; Tesoro Alaska Company; Tesoro Logistics Operations, LLC; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-20

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Kenai Pipe Line Company; Tesoro Alaska Company; Tesoro Logistics Operations... Company (Tesoro Alaska), and Tesoro Logistics, LLC (TLO) (collectively, Tesoro) filed a Request...

  14. Company Portfolios Answer the Question: What Do You Know about My Company?

    ERIC Educational Resources Information Center

    Watson, Michelle L.

    2001-01-01

    Job seekers can demonstrate their knowledge of a potential employer by developing a company portfolio. Elements include company history, mission, values, and goals; size and location(s); financial status; and recent changes in the company and industry. (SK)

  15. 75 FR 61835 - Jackson & Lansing Railroad Company-Trackage Rights Exemption-Norfolk Southern Railway Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-06

    ... Surface Transportation Board Jackson & Lansing Railroad Company--Trackage Rights Exemption-- Norfolk Southern Railway Company Pursuant to a written Assignment of Trackage Rights and Other Joint Facility Agreements (Trackage Agreement) dated September 16, 2010, Norfolk Southern Railway Company (NSR) has...

  16. 75 FR 60865 - Surety Companies Acceptable on Federal Bonds: Amendment-Allegheny Casualty Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-01

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF THE TREASURY Fiscal Service Surety Companies Acceptable on Federal Bonds: Amendment-- Allegheny Casualty Company... INFORMATION: The underwriting limitation for Allegheny Casualty Company (NAIC 13285), which was listed in...

  17. Column flotation results at Powell Mountain Coal Company

    SciTech Connect

    Peters, W.J. Parekh, B.K. )

    1992-01-01

    In 1989 a column flotation process was developed at the CAER, which enabled the economical recovery of coal fines from high-ash fine refuse. The laboratory design was expanded to commercial scale and installed at the Mayflower Coal Preparation Plant of Powell Mountain Coal Company in December, 1989. It has been in continuous operation there since that time. This article is a summary of the past two years' experiences with this applied technology, applicable dewatering tests and flotation tests results from the plant.

  18. World electric power plants database

    SciTech Connect

    2006-06-15

    This global database provides records for 104,000 generating units in over 220 countries. These units include installed and projected facilities, central stations and distributed plants operated by utilities, independent power companies and commercial and self-generators. Each record includes information on: geographic location and operating company; technology, fuel and boiler; generator manufacturers; steam conditions; unit capacity and age; turbine/engine; architect/engineer and constructor; and pollution control equipment. The database is issued quarterly.

  19. 42. Photocopy of photograph, c. 1930. DETAIL OF 33,000 VOLT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    42. Photocopy of photograph, c. 1930. DETAIL OF 33,000 VOLT HIGH TENSION SUBSTATION AND STEP UP TRANSFORMERS. (From the collection of the files of Mr. Tony Robucci, Supervisor for Minor Stations, Potomac Edison Company, Hagerstown, MD) - Dam No. 5 Hydroelectric Plant, On Potomac River, Hedgesville, Berkeley County, WV

  20. 46. Photocopy of photograph, c. 1933. VIEW OF DAM AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    46. Photocopy of photograph, c. 1933. VIEW OF DAM AND FOREBAY. NOTE ALL WATER FLOWING THROUGH FOREBAY AND OUT EITHER TAILRACE OR SLUICE GATE (INSTEAD OF OVER DAM) BECAUSE OF LOW WATER FLOW. (Courtesy of the Potomac Edison Company Library (Hagerstown, MD), Historical Data Files, Dam No. 5 listing - Dam No. 5 Hydroelectric Plant, On Potomac River, Hedgesville, Berkeley County, WV

  1. 58. Photocopy of photograph, no date. VIEW OF GENERATOR UNIT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    58. Photocopy of photograph, no date. VIEW OF GENERATOR UNIT 2. (Courtesy of the Potomac Edison Company Library (Hagerstown, MD), Historical Data Files, Properties-Buildings and Equipment listing) - Dam No. 5 Hydroelectric Plant, On Potomac River, Hedgesville, Berkeley County, WV

  2. 13. Photocopy of architectural drawing #571718 (original drawing located in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. Photocopy of architectural drawing #571718 (original drawing located in Southern California Edison Archives, Rosemead, California). THREE FAMILY HOUSE FOR SOUTHERN SIERRAS POWER COMPANY LEE VINING CREEK POWER PLANT, FLOOR PLAN. - Lee Vining Creek Hydroelectric System, Triplex Cottage, Lee Vining Creek, Lee Vining, Mono County, CA

  3. 7. Photocopy of architectural drawing #571717 (original drawing located in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. Photocopy of architectural drawing #571717 (original drawing located in Southern California Edison Archives, Rosemead, California). THREE FAMILY HOUSE FOR SOUTHERN SIERRAS POWER COMPANY LEE VINING CREEK POWER PLANT, FOUNDATION PLAN. - Lee Vining Creek Hydroelectric System, Triplex Cottage, Lee Vining Creek, Lee Vining, Mono County, CA

  4. 77 FR 133 - In the Matter of Connecticut Yankee Atomic Power Company; Northeast Utilities; NSTAR (Haddam Neck...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-03

    ... COMMISSION In the Matter of Connecticut Yankee Atomic Power Company; Northeast Utilities; NSTAR (Haddam Neck Plant); Order Approving Application Regarding Proposed Merger I Connecticut Yankee Atomic Power Company (Connecticut Yankee or the licensee) is the holder of Facility Operating License No. DPR-61, which...

  5. Scaling behavior in economics: The problem of quantifying company growth

    NASA Astrophysics Data System (ADS)

    Nunes Amaral, Luís A.; Buldyrev, Sergey V.; Havlin, Shlomo; Maass, Philipp; Salinger, Michael A.; Eugene Stanley, H.; Stanley, Michael H. R.

    1997-02-01

    Inspired by work of both Widom and Mandelbrot, we analyze the Computstat database comprising all publicly traded United States manufacturing companies in the years 1974-1993. We find that the distribution of company size remains stable for the 20 years we study, i.e., the mean value and standard deviation remain approximately constant. We study the distribution of sizes of the “new” companies in each year and find it to be well approximated by a log- normal. We find (i) the distribution of the logarithm of the growth rates, for a fixed growth period of T years, and for companies with approximately the same size S displays an exponential “tent-shaped” form rather than the bell-shaped Gaussian, one would expect for a log-normal distribution, and (ii) the fluctuations in the growth rates - measured by the width of this distribution σT - decrease with company size and increase with time T. We find that for annual growth rates ( T = 1), σT ∼ S- β, and that the exponent β takes the same value, within the error bars, for several measures of the size of a company. In particular, we obtain β = 0.20 ± 0.03 for sales, β = 0.18 ± 0.03 for number of employees, β = 0.18±0.03 for assets, β = 0.18 ± 0.03 for cost of goods sold, and β = 0.20 ± 0.03 for propert, plant, and equipment. We propose models that may lead to some insight into these phenomena. First, we study a model in which the growth rate of a company is affected by a tendency to retain an “optimal” size. That model leads to an exponential distribution of the logarithm of growth rate in agreement with the empirical results. Then, we study a hierarchical tree-like model of a company that enables us to relate β to parameters of a company structure. We find that β = -1n Π/1n z, where z defines the mean branching ratio of the hierarchical tree and Π is the probability that the lower levels follow the policy of higher levels in the hierarchy. We also study the output distribution of growth

  6. 17 CFR 270.3a-3 - Certain investment companies owned by companies which are not investment companies.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 17 Commodity and Securities Exchanges 3 2011-04-01 2011-04-01 false Certain investment companies owned by companies which are not investment companies. 270.3a-3 Section 270.3a-3 Commodity and Securities Exchanges SECURITIES AND EXCHANGE COMMISSION (CONTINUED) RULES AND REGULATIONS, INVESTMENT...

  7. 17 CFR 270.3a-3 - Certain investment companies owned by companies which are not investment companies.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 17 Commodity and Securities Exchanges 3 2012-04-01 2012-04-01 false Certain investment companies owned by companies which are not investment companies. 270.3a-3 Section 270.3a-3 Commodity and Securities Exchanges SECURITIES AND EXCHANGE COMMISSION (CONTINUED) RULES AND REGULATIONS, INVESTMENT...

  8. 17 CFR 270.3a-3 - Certain investment companies owned by companies which are not investment companies.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 17 Commodity and Securities Exchanges 4 2014-04-01 2014-04-01 false Certain investment companies owned by companies which are not investment companies. 270.3a-3 Section 270.3a-3 Commodity and Securities Exchanges SECURITIES AND EXCHANGE COMMISSION (CONTINUED) RULES AND REGULATIONS, INVESTMENT...

  9. 17 CFR 270.3a-3 - Certain investment companies owned by companies which are not investment companies.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 17 Commodity and Securities Exchanges 3 2010-04-01 2010-04-01 false Certain investment companies owned by companies which are not investment companies. 270.3a-3 Section 270.3a-3 Commodity and Securities Exchanges SECURITIES AND EXCHANGE COMMISSION (CONTINUED) RULES AND REGULATIONS, INVESTMENT...

  10. 17 CFR 270.3a-3 - Certain investment companies owned by companies which are not investment companies.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 17 Commodity and Securities Exchanges 3 2013-04-01 2013-04-01 false Certain investment companies owned by companies which are not investment companies. 270.3a-3 Section 270.3a-3 Commodity and Securities Exchanges SECURITIES AND EXCHANGE COMMISSION (CONTINUED) RULES AND REGULATIONS, INVESTMENT...

  11. 78 FR 69710 - Luminant Generation Company, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-20

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Luminant Generation Company, LLC AGENCY: U.S. Nuclear Regulatory Commission (NRC). ACTION... consecutive weeks of a combined license (COL) application from Luminant Generation Company, LLC....

  12. 78 FR 66785 - Luminant Generation Company, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-06

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Luminant Generation Company, LLC AGENCY: Nuclear Regulatory Commission. ACTION: Notice of receipt... consecutive weeks of ] a combined license (COL) application from Luminant Generation Company, LLC....

  13. Overhead Door Company of Charleston Information Sheet

    EPA Pesticide Factsheets

    Overhead Door Company of Charleston (the Company) is located in North Charleston, South Carolina. The settlement involves renovation activities conducted at a property constructed prior to 1978, located in Isle of Palms, South Carolina.

  14. 78 FR 68100 - Luminant Generation Company, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-13

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Luminant Generation Company, LLC AGENCY: U.S. Nuclear Regulatory Commission (NRC). ACTION... consecutive weeks of a combined license (COL) application from Luminant Generation Company, LLC....

  15. Natural gas annual 1992: Supplement: Company profiles

    SciTech Connect

    Not Available

    1994-01-01

    The data for the Natural Gas Annual 1991 Supplement : Company Profiles are taken from Form EIA-176, (open quotes) Annual Report of Natural and Supplemental Gas Supply and Disposition (close quotes). Other sources include industry literature and corporate annual reports to shareholders. The companies appearing in this report are major interstate natural gas pipeline companies, large distribution companies, or combination companies with both pipeline and distribution operations. The report contains profiles of 45 corporate families. The profiles describe briefly each company, where it operates, and any important issues that the company faces. The purpose of this report is to show the movement of natural gas through the various States served by the 45 large companies profiled.

  16. "Life without nuclear power": A nuclear plant retirement formulation model and guide based on economics. San Onofre Nuclear Generating Station case: Economic impacts and reliability considerations leading to plant retirement

    NASA Astrophysics Data System (ADS)

    Wasko, Frank

    Traditionally, electric utilities have been slow to change and very bureaucratic in nature. This culture, in and of itself, has now contributed to a high percentage of United States electric utilities operating uneconomical nuclear plants (Crooks, 2014). The economic picture behind owning and operating United States nuclear plants is less than favorable for many reasons including rising fuel, capital and operating costs (EUCG, 2012). This doctoral dissertation is specifically focused on life without nuclear power. The purpose of this dissertation is to create a model and guide that will provide electric utilities who currently operate or will operate uneconomical nuclear plants the opportunity to economically assess whether or not their nuclear plant should be retired. This economic assessment and stakeholder analysis will provide local government, academia and communities the opportunity to understand how Southern California Edison (SCE) embraced system upgrade import and "voltage support" opportunities to replace "base load" generation from San Onofre Nuclear Generating Station (SONGS) versus building new replacement generation facilities. This model and guide will help eliminate the need to build large replacement generation units as demonstrated in the SONGS case analysis. The application of The Nuclear Power Retirement Model and Guide will provide electric utilities with economic assessment parameters and an evaluation assessment progression needed to better evaluate when an uneconomical nuclear plant should be retired. It will provide electric utilities the opportunity to utilize sound policy, planning and development skill sets when making this difficult decision. There are currently 62 nuclear power plants (with 100 nuclear reactors) operating in the United States (EIA, 2014). From this group, 38 are at risk of early retirement based on the work of Cooper (2013). As demonstrated in my model, 35 of the 38 nuclear power plants qualify to move to the economic

  17. Thomas Edison Accelerated Elementary School.

    ERIC Educational Resources Information Center

    Levin, Henry M.; Chasin, Gene

    This paper describes early outcomes of a Sacramento, California, elementary school that participated in the Accelerated Schools Project. The school, which serves many minority and poor students, began training for the project in 1992. Accelerated Schools were designed to advance the learning rate of students through a gifted and talented approach,…

  18. Lifetime Innovations of Thomas Edison

    THOMAS, 111th Congress

    Rep. Payne, Donald M. [D-NJ-10

    2009-01-06

    02/04/2009 Referred to the Subcommittee on National Parks, Forests and Public Lands. (All Actions) Notes: For further action, see H.R.146, which became Public Law 111-11 on 3/30/2009. Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  19. Environmental Experiments...from Edison.

    ERIC Educational Resources Information Center

    Schultz, Robert F.

    Background information, lists of materials needed, and procedures are provided for 12 experiments which focus on various aspects of pollution and the environment. Topics considered in the investigations are: (1) solids in the air; (2) effect of air pollution on nylon; (3) measuring lung capacity; (4) an electrical smoke trap; (5) photosynthesis;…

  20. 76 FR 1666 - Susquehanna Union Railroad Company-Control Exemption-North Shore Railroad Company, Nittany & Bald...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-11

    ... Surface Transportation Board Susquehanna Union Railroad Company--Control Exemption--North Shore Railroad Company, Nittany & Bald Eagle Railroad Company, Shamokin Valley Railroad Company, Juniata Valley Railroad Company, Lycoming Valley Railroad Company, and Union County Industrial Railroad Company On April 12,...

  1. 75 FR 71417 - 2010 Company Organization Survey

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-23

    ... Bureau of the Census 2010 Company Organization Survey AGENCY: Bureau of the Census, Commerce. ACTION: Notice of determination. SUMMARY: The Bureau of the Census (Census Bureau) is conducting the 2010 Company Organization Survey. The survey's data are needed, in part, to update the multilocation companies in...

  2. 76 FR 36625 - Mutual Holding Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-22

    ... Office of Thrift Supervision Mutual Holding Company AGENCY: Office of Thrift Supervision (OTS), Treasury... collection. Title of Proposal: Mutual Holding Company. OMB Number: 1550-0072. Form Numbers: MHC-1 (OTS Form... whether the applicant meets the statutory and regulatory criteria to form a mutual holding company...

  3. 78 FR 64911 - 2013 Company Organization Survey

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-30

    ... Bureau of the Census 2013 Company Organization Survey AGENCY: Bureau of the Census, Commerce. ACTION: Notice of Determination. SUMMARY: The Bureau of the Census (Census Bureau) is conducting the 2013 Company Organization Survey. The survey's data are needed, in part, to update the multilocation companies in...

  4. 76 FR 20458 - Mutual Holding Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-12

    ... Office of Thrift Supervision Mutual Holding Company AGENCY: Office of Thrift Supervision (OTS), Treasury... collection. Title of Proposal: Mutual Holding Company. OMB Number: 1550-0072. Form Numbers: MHC-1 (OTS Form... whether the applicant meets the statutory and regulatory criteria to form a mutual holding company...

  5. 76 FR 62759 - 2011 Company Organization Survey

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-11

    ... Bureau of the Census 2011 Company Organization Survey AGENCY: Bureau of the Census, Commerce. ACTION: Notice of determination. SUMMARY: The Bureau of the Census (Census Bureau) is conducting the 2011 Company Organization Survey. The survey's data are needed, in part, to update the multilocation companies in...

  6. 78 FR 27218 - Mountaineer Gas Company v. Washington Gas Light Company: Notice of Complaint

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-09

    ... Energy Regulatory Commission Mountaineer Gas Company v. Washington Gas Light Company: Notice of Complaint... complaint against Washington Gas Light Company (WGL or Respondent), pursuant to the Natural Gas Act (NGA... the contacts of Washington Gas Light Company as listed on the Commission's list of Corporate...

  7. 78 FR 28831 - Mountaineer Gas Company v. Washington Gas Light Company; Notice of Complaint

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ... Energy Regulatory Commission Mountaineer Gas Company v. Washington Gas Light Company; Notice of Complaint... complaint against Washington Gas Light Company (WGL or Respondent), pursuant to the Natural Gas Act (NGA... the contacts of Washington Gas Light Company as listed on the Commission's list of Corporate...

  8. 78 FR 23633 - Union Pacific Railroad Company-Trackage Rights Exemption-Illinois Central Railroad Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-19

    ... Surface Transportation Board Union Pacific Railroad Company--Trackage Rights Exemption-- Illinois Central Railroad Company Illinois Central Railroad Company (IC), pursuant to a written agreement dated December 18, 2012, has agreed to grant overhead trackage rights to Union Pacific Railroad Company (UP) over...

  9. 77 FR 67442 - Soo Line Railroad Company-Temporary Trackage Rights Exemption-BNSF Railway Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-09

    ... Surface Transportation Board Soo Line Railroad Company--Temporary Trackage Rights Exemption-- BNSF Railway Company BNSF Railway Company (BNSF), pursuant to a written trackage rights agreement (Agreement), has agreed to grant temporary overhead trackage rights to Soo Line Railroad Company d/b/a Canadian...

  10. 76 FR 34805 - Arkansas Midland Railroad Company, Inc., Trackage Rights Exemption; Caddo Valley Railroad Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-14

    ... Surface Transportation Board Arkansas Midland Railroad Company, Inc., Trackage Rights Exemption; Caddo Valley Railroad Company Pursuant to a written trackage rights agreement, Caddo Valley Railroad Company (CVR) has agreed to grant local trackage rights to Arkansas Midland Railroad Company, Inc. (AKMD)...

  11. 78 FR 18970 - Trunkline LNG Company, LLC; Trunkline LNG Export, LLC; Trunkline Gas Company, LLC; Supplemental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-28

    ... Energy Regulatory Commission Trunkline LNG Company, LLC; Trunkline LNG Export, LLC; Trunkline Gas Company... Trunkline LNG Company, LLC; Trunkline LNG Export, LLC; and Trunkline Gas Company, LLC (collectively referred... natural gas (LNG) terminal in Calcasieu Parish, Louisiana to liquefy natural gas and export the LNG....

  12. 75 FR 2126 - Calais Pipeline Company, LLC; Calais LNG Project Company, LLC; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-14

    ... Energy Regulatory Commission Calais Pipeline Company, LLC; Calais LNG Project Company, LLC; Notice of Application January 6, 2010. Take notice that on December 18, 2009, Calais LNG Project Company, LLC (Calais LNG) and Calais Pipeline Company, LLC (Calais Pipeline) 142 ] Main Street, P.O. Box 133, Calais,...

  13. 77 FR 55207 - Florida Gas Transmission Company, LLC, Florida Gas Transmission Company, LLC; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... Energy Regulatory Commission Florida Gas Transmission Company, LLC, Florida Gas Transmission Company, LLC; Notice of Application Take notice that on August 16, 2012, Florida Gas Transmission Company, LLC (FGT... & Tariffs, Florida Gas Transmission Company, LLC, 5051 Westheimer Road, Houston, Texas, 77056, or call...

  14. 77 FR 75263 - Surety Companies Acceptable on Federal Bonds: Termination; ULLICO Casualty Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-19

    ... Fiscal Service Surety Companies Acceptable on Federal Bonds: Termination; ULLICO Casualty Company AGENCY... Company (NAIC 37893) under 31 U.S.C. 9305 to qualify as an acceptable surety on Federal bonds is... bonds, including continuous bonds, currently in force with above listed Company, bond-approving...

  15. 77 FR 75263 - Surety Companies Acceptable on Federal Bonds: Termination; Universal Insurance Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-19

    ... Fiscal Service Surety Companies Acceptable on Federal Bonds: Termination; Universal Insurance Company... Insurance Company (NAIC 31704) under 31 U.S.C. 9305 to qualify as an acceptable surety on Federal bonds is... bonds, including continuous bonds, currently in force with above listed Company, bond-approving...

  16. 77 FR 25535 - Surety Companies Acceptable On Federal Bonds: Pacific Employers Insurance Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-30

    ... Fiscal Service Surety Companies Acceptable On Federal Bonds: Pacific Employers Insurance Company AGENCY....C. 9305 to the following company: Pacific Employers Insurance Company (NAIC 22748). Business Address... prior to that date. The Certificates are subject to subsequent annual renewal as long as the...

  17. 75 FR 21146 - Union Pacific Railroad Company-Trackage Rights Exemption-BNSF Railway Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-22

    ... Surface Transportation Board Union Pacific Railroad Company--Trackage Rights Exemption--BNSF Railway Company Pursuant to a written trackage rights agreement dated December 16, 2009, BNSF Railway Company (BNSF) has agreed to grant overhead trackage rights to Union Pacific Railroad Company (UP) over a...

  18. 75 FR 10341 - Montoff Transportation Company, LLC-Acquisition Exemption-BNSF Railway Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-05

    ...] Montoff Transportation Company, LLC--Acquisition Exemption--BNSF Railway Company Montoff Transportation Company, LLC (Montoff), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to acquire from BNSF Railway Company (BNSF) its right to reactivate rail service on a 42.80-mile...

  19. 76 FR 37891 - Surety Companies Acceptable on Federal Bonds; Termination; Western Insurance Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-28

    ... Fiscal Service Surety Companies Acceptable on Federal Bonds; Termination; Western Insurance Company... Western Insurance Company (NAIC 10008) under 31 U.S.C. 9305 to qualify as an acceptable surety on Federal... Company, bond-approving officers should secure new bonds with acceptable sureties in those instances...

  20. 77 FR 553 - Surety Companies Acceptable on Federal Bonds: Termination; Western Bonding Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-05

    ... Fiscal Service Surety Companies Acceptable on Federal Bonds: Termination; Western Bonding Company AGENCY... Company (NAIC 13191) under 31 U.S.C. 9305 to qualify as an acceptable surety on Federal bonds is... bonds, including continuous bonds, currently in force with above listed Company, bond-approving...

  1. 78 FR 63564 - BNSF Railway Company-Trackage Rights Exemption-Union Pacific Railroad Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-24

    ... Surface Transportation Board BNSF Railway Company--Trackage Rights Exemption--Union Pacific Railroad Company Pursuant to a written trackage rights agreement, Union Pacific Railroad Company (UP) has agreed to grant overhead trackage rights to BNSF Railway Company (BNSF) over the following UP rail lines: (1)...

  2. 77 FR 14058 - BNSF Railway Company-Trackage Rights Exemption-Union Pacific Railroad Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-08

    ... Surface Transportation Board BNSF Railway Company--Trackage Rights Exemption--Union Pacific Railroad Company Pursuant to a written trackage rights agreement, Union Pacific Railroad Company (UP) has agreed to grant trackage rights to BNSF Railway Company (BNSF) over a portion of a line of railroad known as...

  3. 78 FR 2719 - BNSF Railway Company-Lease Exemption-Norfolk Southern Railway Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-14

    ... TRANSPORTATION Surface Transportation Board BNSF Railway Company--Lease Exemption--Norfolk Southern Railway Company AGENCY: Surface Transportation Board, DOT. ACTION: Notice of exemption. SUMMARY: Under 49 U.S.C.... 11323-25 for BNSF Railway Company (BNSF) to lease from Norfolk Southern Railway Company approximately...

  4. 75 FR 36153 - Surety Companies Acceptable on Federal Bonds-Terminations: Victore Insurance Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-24

    ... Fiscal Service Surety Companies Acceptable on Federal Bonds--Terminations: Victore Insurance Company... the above-named company under 31 U.S.C. 9305 to qualify as acceptable surety on Federal bonds is... bonds currently in force with this company, bond-approving officers may let such bonds run to...

  5. 78 FR 50141 - Illinois Central Railroad Company-Trackage Rights Exemption-BNSF Railway Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-16

    ... Surface Transportation Board Illinois Central Railroad Company--Trackage Rights Exemption-- BNSF Railway Company BNSF Railway Company (BNSF), pursuant to a written trackage rights agreement dated June 17, 2013, has agreed to grant overhead trackage rights to Illinois Central Railroad Company (IC), a wholly...

  6. Plasma polychlorinated biphenyls (PCB) levels of workers in a transformer recycling company, their family members, and employees of surrounding companies.

    PubMed

    Schettgen, Thomas; Gube, Monika; Esser, Andre; Alt, Anne; Kraus, Thomas

    2012-01-01

    In spring 2010, high internal exposures (up to 236 μg/L plasma) for the sum of indicator polychlorinated biphenyls (PCB) were discovered in workers in a transformer recycling company in Germany, where PCB-contaminated material was not handled according to proper occupational hygiene. The release of PCB from this company raised growing concerns regarding possible adverse human health effects correlated with this exposure. This provided a basis for a large biological monitoring study in order to examine the internal exposure to PCB in individuals working in that recycling company, their family members, and relatives, as well as subjects working or living in the surroundings of this company. Blood samples from 116 individuals (formerly) employed in the transformer recycling company and 45 direct relatives of these persons were obtained. Further, blood samples of 190 subjects working in close vicinity of the recycling plant, 277 persons working in the larger area, and 41 residents of the area were investigated. Plasma samples were analyzed for the 6 indicator PCB (PCB 28, 52, 101, 138, 153, 180) and 12 dioxin-like PCB using gas chromatography/mass spectroscopy (GC/MS; limit of detection [LOD] at 0.01 μg/L). Median concentrations (maximum) for the sum of the 6 indicator PCB in blood of the employees, their relatives, individuals working in close vicinity, persons working in the larger area, and the residents were 3.68 (236.3), 1.86 (22.8), 1.34 (22.9), 1.19 (6.42), and 0.85 (7.22) μg/L plasma, respectively. The (former) employees of the transformer recycling plant partly showed the highest plasma PCB levels determined thus far in Germany. Even family members displayed highly elevated levels of PCB in blood due to contaminations of their homes by laundering of contaminated clothes. Vicinity to the recycling plant including reported contact with possibly contaminated scrap was the main contributor to the PCB levels of the workers of the surrounding companies. Residents

  7. Getting along with reporters, environmentalists, and regulators: how to get your company`s message on the air

    SciTech Connect

    Pearson, A.

    1994-09-01

    Oil and gas companies continue to get clobbered with expensive and punishing environmental regulations and drilling bans because they have done a poor job of convincing the public, the press, and the government that their operating practices are environmentally safe. The oil industry also continues to be perceived as arrogant and secretive, which only aggravates its problems. Smart operators must learn to balance profitable development with earth-friendliness. They also must learn to tell their story more effectively and openly, not just through big trade groups like the API and IPAA, but as individual small businessmen working to improve the economies and job bases of their local communities. That means being more forthcoming with next-door neighbors and environmental groups, befriending local and national reporters who cover their companies, and fine-tuning messages and communications skills. Companies also can improve their image and hopefully lighten their regulatory burden by thinking up creative, win-win solutions to environmental problems their projects create. One company solved the problem of where to dump offshore channel dredging waste, for example, by creating a new island off south Texas with a carefully planted habitat that last year attracted a pair of endangered whooping cranes. State regulators loved it, it cost very little, and the press coverage was extremely positive.

  8. Getting along with reporters, environmentalists, and regulators: How to get your company`s message on the air

    SciTech Connect

    Pearson, A.

    1994-12-31

    Oil and gas companies continue to get clobbered with expensive and punishing environmental regulations and drilling bans because they have done a poor job of convincing the public, the press, and the government that their operating practices are environmentally safe. The oil industry also continues to be perceived of as arrogant and secretive, which only aggravates its problems. Smart operators must learn to balance profitable development with earth-friendliness. They also must learn to tell their story more effectively and openly, not just through big trade groups like the API and IPAA, but as individual small businessmen working to improve the economies and job bases of their local communities. That means being more forthcoming with next-door neighbors and environmental groups, befriending local and national reporters who cover their companies, and fine-tuning messages and communications skills. Companies also can improve their images and, ideally, lighten their regulatory burdens by thinking of creative, win-win solutions to environmental problems their projects create. One company, for example, solved the problem of where to dump offshore channel dredging waste by creating a new island off South Texas with a carefully planted habitat that last year attracted a pair of endangered whooping cranes. State regulators loved it, it cost very little, and the press coverage was extremely positive.

  9. National Steel Pellet Company`s secondary grinding circuit modifications

    SciTech Connect

    Wennen, J.E.; Nordstrom, W.J.; Murr, D.L.

    1996-12-31

    National Steel Pellet Company (NSPC) conducted pilot scale testing and computer simulation studies which indicates that the capacity of the secondary grinding mill could be increased and that concentrate grade improvement could be expected with improved classification in the grinding circuit. Based on these studies, a decision was made to modify one secondary ball mill line at NSPC to include both cyclone and screen classification with magnetic separation applied to the circulating load. This paper will briefly discuss the studies leading to the decision to modify the circuit, the design of the modified circuit and the initial start-up and operating experience.

  10. Applicability of PSD to Carter Oil Company Pilot Plant

    EPA Pesticide Factsheets

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  11. Reload design process at Yankee Atomic Electric Company

    SciTech Connect

    Weader, R.J.

    1986-01-01

    Yankee Atomic Electric Company (YAEC) performs reload design and licensing for their nuclear power plants: Yankee Rowe, Maine Yankee, and Vermont Yankee. Significant savings in labor and computer costs have been achieved in the reload design process by the use of the SIMULATE nodal code using the CASMO assembly burnup code or LEOPARD pin cell burnup code inputs to replace the PDQ diffusion theory code in many required calculations for the Yankee Rowe and Maine Yankee pressurized water reactors (PWRs). An efficient process has evolved for the design of reloads for the Vermont Yankee boiling water reactor (BWR). Due to the major differences in the core design of the three plants, different reload design processes have evolved for each plant.

  12. [Tampa Electric Company IGCC project]. Final public design report; Technical progress report

    SciTech Connect

    1996-07-01

    This final Public Design Report (PDR) provides completed design information about Tampa Electric Company`s Polk Power Station Unit No. 1, which will demonstrate in a commercial 250 MW unit the operating parameters and benefits of the integration of oxygen-blown, entrained-flow coal gasification with advanced combined cycle technology. Pending development of technically and commercially viable sorbent for the Hot Gas Cleanup System, the HGCU also is demonstrated. The report is organized under the following sections: design basis description; plant descriptions; plant systems; project costs and schedule; heat and material balances; general arrangement drawings; equipment list; and miscellaneous drawings.

  13. Owners of Nuclear Power Plants

    SciTech Connect

    Reid, R.L.

    2000-01-12

    Commercial nuclear power plants in this country can be owned by a number of separate entities, each with varying ownership proportions. Each of these owners may, in turn, have a parent/subsidiary relationship to other companies. In addition, the operator of the plant may be a different entity as well. This report provides a compilation on the owners/operators for all commercial power reactors in the United States. While the utility industry is currently experiencing changes in organizational structure which may affect nuclear plant ownership, the data in this report is current as of November 1999. The report is divided into sections representing different aspects of nuclear plant ownership.

  14. Owners of nuclear power plants

    SciTech Connect

    Hudson, C.R.; White, V.S.

    1996-11-01

    Commercial nuclear power plants in this country can be owned by a number of separate entities, each with varying ownership proportions. Each of these owners may, in turn, have a parent/subsidiary relationship to other companies. In addition, the operator of the plant may be a different entity as well. This report provides a compilation on the owners/operators for all commercial power reactors in the United States. While the utility industry is currently experiencing changes in organizational structure which may affect nuclear plant ownership, the data in this report is current as of July 1996. The report is divided into sections representing different aspects of nuclear plant ownership.

  15. Special Analysis for the Disposal of the Consolidated Edison Uranium Solidification Project Waste Stream at the Area 5 Radioactive Waste Management Site, Nevada National Security Site, Nye County, Nevada

    SciTech Connect

    NSTec Environmental Management

    2013-01-31

    The purpose of this Special Analysis (SA) is to determine if the Oak Ridge (OR) Consolidated Edison Uranium Solidification Project (CEUSP) uranium-233 (233U) waste stream (DRTK000000050, Revision 0) is acceptable for shallow land burial (SLB) at the Area 5 Radioactive Waste Management Site (RWMS) on the Nevada National Security Site (NNSS). The CEUSP 233U waste stream requires a special analysis because the concentrations of thorium-229 (229Th), 230Th, 232U, 233U, and 234U exceeded their NNSS Waste Acceptance Criteria action levels. The acceptability of the waste stream is evaluated by determining if performance assessment (PA) modeling provides a reasonable expectation that SLB disposal is protective of human health and the environment. The CEUSP 233U waste stream is a long-lived waste with unique radiological hazards. The SA evaluates the long-term acceptability of the CEUSP 233U waste stream for near-surface disposal as a two tier process. The first tier, which is the usual SA process, uses the approved probabilistic PA model to determine if there is a reasonable expectation that disposal of the CEUSP 233U waste stream can meet the performance objectives of U.S. Department of Energy Manual DOE M 435.1-1, “Radioactive Waste Management,” for a period of 1,000 years (y) after closure. The second tier addresses the acceptability of the OR CEUSP 233U waste stream for near-surface disposal by evaluating long-term site stability and security, by performing extended (i.e., 10,000 and 60,000 y) modeling analyses, and by evaluating the effect of containers and the depth of burial on performance. Tier I results indicate that there is a reasonable expectation of compliance with all performance objectives if the OR CEUSP 233U waste stream is disposed in the Area 5 RWMS SLB disposal units. The maximum mean and 95th percentile PA results are all less than the performance objective for 1,000 y. Monte Carlo uncertainty analysis indicates that there is a high likelihood of

  16. Idaho Chemical Processing Plant and Plutonium-Uranium Extraction Plant phaseout/deactivation study

    SciTech Connect

    Patterson, M.W.; Thompson, R.J.

    1994-01-01

    The decision to cease all US Department of Energy (DOE) reprocessing of nuclear fuels was made on April 28, 1992. This study provides insight into and a comparison of the management, technical, compliance, and safety strategies for deactivating the Idaho Chemical Processing Plant (ICPP) at Westinghouse Idaho Nuclear Company (WINCO) and the Westinghouse Hanford Company (WHC) Plutonium-Uranium Extraction (PUREX) Plant. The purpose of this study is to ensure that lessons-learned and future plans are coordinated between the two facilities.

  17. 76 FR 35024 - The Travelers Indemnity Company, a Wholly-Owned Subsidiary of The Travelers Companies, Inc...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-15

    ... Travelers Companies, Inc., Personal Insurance Division, Customer Sales and Service Business Unit, Account... Companies, Inc., Personal Insurance Division, Customer Sales and Service Business Unit, Account Processing... Indemnity Company, a wholly-owned subsidiary of The Travelers Companies, Inc., Personal Insurance...

  18. 12 CFR 390.303 - Parent company; subsidiary.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 12 Banks and Banking 5 2012-01-01 2012-01-01 false Parent company; subsidiary. 390.303 Section 390... Affecting All State Savings Associations § 390.303 Parent company; subsidiary. The term parent company means any company which directly or indirectly controls any other company or companies. The term...

  19. 12 CFR 583.4 - Bank holding company.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 12 Banks and Banking 6 2012-01-01 2012-01-01 false Bank holding company. 583.4 Section 583.4 Banks... AFFECTING SAVINGS AND LOAN HOLDING COMPANIES § 583.4 Bank holding company. The term bank holding company means any company which has control over any bank or over any company that is or becomes a bank...

  20. 12 CFR 575.14 - Subsidiary holding companies.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 12 Banks and Banking 6 2012-01-01 2012-01-01 false Subsidiary holding companies. 575.14 Section... COMPANIES § 575.14 Subsidiary holding companies. (a) Subsidiary holding companies. A mutual holding company may establish a subsidiary holding company as a direct subsidiary to hold 100% of the stock of...

  1. 12 CFR 239.11 - Subsidiary holding companies.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 12 Banks and Banking 4 2014-01-01 2014-01-01 false Subsidiary holding companies. 239.11 Section... SYSTEM (CONTINUED) MUTUAL HOLDING COMPANIES (REGULATION MM) Mutual Holding Companies § 239.11 Subsidiary holding companies. (a) Subsidiary holding companies. A mutual holding company may establish a...

  2. 12 CFR 390.303 - Parent company; subsidiary.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 12 Banks and Banking 5 2014-01-01 2014-01-01 false Parent company; subsidiary. 390.303 Section 390... Affecting All State Savings Associations § 390.303 Parent company; subsidiary. The term parent company means any company which directly or indirectly controls any other company or companies. The term...

  3. 12 CFR 161.37 - Parent company; subsidiary.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 12 Banks and Banking 1 2014-01-01 2014-01-01 false Parent company; subsidiary. 161.37 Section 161... REGULATIONS AFFECTING ALL SAVINGS ASSOCIATIONS § 161.37 Parent company; subsidiary. The term parent company means any company which directly or indirectly controls any other company or companies. The...

  4. 12 CFR 583.4 - Bank holding company.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 12 Banks and Banking 6 2014-01-01 2012-01-01 true Bank holding company. 583.4 Section 583.4 Banks... AFFECTING SAVINGS AND LOAN HOLDING COMPANIES § 583.4 Bank holding company. The term bank holding company means any company which has control over any bank or over any company that is or becomes a bank...

  5. 12 CFR 583.4 - Bank holding company.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Bank holding company. 583.4 Section 583.4 Banks... AFFECTING SAVINGS AND LOAN HOLDING COMPANIES § 583.4 Bank holding company. The term bank holding company means any company which has control over any bank or over any company that is or becomes a bank...

  6. 12 CFR 575.14 - Subsidiary holding companies.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 12 Banks and Banking 6 2014-01-01 2012-01-01 true Subsidiary holding companies. 575.14 Section 575... COMPANIES § 575.14 Subsidiary holding companies. (a) Subsidiary holding companies. A mutual holding company may establish a subsidiary holding company as a direct subsidiary to hold 100% of the stock of...

  7. 12 CFR 161.37 - Parent company; subsidiary.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 12 Banks and Banking 1 2013-01-01 2013-01-01 false Parent company; subsidiary. 161.37 Section 161... REGULATIONS AFFECTING ALL SAVINGS ASSOCIATIONS § 161.37 Parent company; subsidiary. The term parent company means any company which directly or indirectly controls any other company or companies. The...

  8. 12 CFR 239.11 - Subsidiary holding companies.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 12 Banks and Banking 4 2013-01-01 2013-01-01 false Subsidiary holding companies. 239.11 Section... SYSTEM (CONTINUED) MUTUAL HOLDING COMPANIES (REGULATION MM) Mutual Holding Companies § 239.11 Subsidiary holding companies. (a) Subsidiary holding companies. A mutual holding company may establish a...

  9. 12 CFR 575.14 - Subsidiary holding companies.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 5 2011-01-01 2011-01-01 false Subsidiary holding companies. 575.14 Section... COMPANIES § 575.14 Subsidiary holding companies. (a) Subsidiary holding companies. A mutual holding company may establish a subsidiary holding company as a direct subsidiary to hold 100% of the stock of...

  10. 12 CFR 575.14 - Subsidiary holding companies.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Subsidiary holding companies. 575.14 Section... COMPANIES § 575.14 Subsidiary holding companies. (a) Subsidiary holding companies. A mutual holding company may establish a subsidiary holding company as a direct subsidiary to hold 100% of the stock of...

  11. 12 CFR 583.4 - Bank holding company.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 12 Banks and Banking 6 2013-01-01 2012-01-01 true Bank holding company. 583.4 Section 583.4 Banks... AFFECTING SAVINGS AND LOAN HOLDING COMPANIES § 583.4 Bank holding company. The term bank holding company means any company which has control over any bank or over any company that is or becomes a bank...

  12. 12 CFR 161.37 - Parent company; subsidiary.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 12 Banks and Banking 1 2012-01-01 2012-01-01 false Parent company; subsidiary. 161.37 Section 161... REGULATIONS AFFECTING ALL SAVINGS ASSOCIATIONS § 161.37 Parent company; subsidiary. The term parent company means any company which directly or indirectly controls any other company or companies. The...

  13. 12 CFR 583.4 - Bank holding company.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 5 2011-01-01 2011-01-01 false Bank holding company. 583.4 Section 583.4 Banks... AFFECTING SAVINGS AND LOAN HOLDING COMPANIES § 583.4 Bank holding company. The term bank holding company means any company which has control over any bank or over any company that is or becomes a bank...

  14. 12 CFR 239.11 - Subsidiary holding companies.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 12 Banks and Banking 4 2012-01-01 2012-01-01 false Subsidiary holding companies. 239.11 Section... SYSTEM (CONTINUED) MUTUAL HOLDING COMPANIES (REGULATION MM) Mutual Holding Companies § 239.11 Subsidiary holding companies. (a) Subsidiary holding companies. A mutual holding company may establish a...

  15. 12 CFR 390.303 - Parent company; subsidiary.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 12 Banks and Banking 5 2013-01-01 2013-01-01 false Parent company; subsidiary. 390.303 Section 390... Affecting All State Savings Associations § 390.303 Parent company; subsidiary. The term parent company means any company which directly or indirectly controls any other company or companies. The term...

  16. 12 CFR 575.14 - Subsidiary holding companies.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 12 Banks and Banking 6 2013-01-01 2012-01-01 true Subsidiary holding companies. 575.14 Section 575... COMPANIES § 575.14 Subsidiary holding companies. (a) Subsidiary holding companies. A mutual holding company may establish a subsidiary holding company as a direct subsidiary to hold 100% of the stock of...

  17. Amedee geothermal power plant

    SciTech Connect

    Hodgson, S.F.

    1988-12-01

    In September 1988, the power plant began generating electricity in Northern California, near Honey Lake. The plant generates 2 megawatts, net, of electricity in the winter, and from 20 to 30% less in the summer, depending on the temperature. Geothermal fluids from two wells are used to operate the plant, and surface discharge is used to dispose of the spent fluids. This is possible because the geothermal fluids have a very low salinity and a composition the same as area hot spring waters. The binary power plant has a Standard Offer No. 4 contract for 5 megawatts with pacific Gas and Electric Company. Sometime in the near future, they will expand the project to add another 3 megawatts of electrical generation.

  18. Occupational noise in printing companies.

    PubMed

    Mihailovic, Aleksandra; Grujic, Selena D; Kiurski, Jelena; Krstic, Jelena; Oros, Ivana; Kovacevic, Ilija

    2011-10-01

    The extent of noise in five printing companies in Novi Sad, Serbia, was determined using TES-1358A Sound Analyzer with RS-232 Interface. The data on equivalent A-level (dBA), as well as, maximum and minimum sound pressure levels were collected. It was found that folders and offset printing units are the predominant noise sources, with the average L (eq) levels of 87.66 and 82.7 dBA, respectively. Forty percent of the machines produced noise levels above the limiting threshold level of 85 dBA, allowed by law. The noise in all printing companies was dominated by higher frequency noise, and the maximum level mostly appeared at 4,000 Hz. For offset printing machines and folders, the means of L (eq) levels exceeded the permissible levels given by NR-80 curve at higher frequencies. There are no published studies of occupational noise and hearing impairment of workers exposed to hazardous noise in printing industry in Serbia. More extensive studies are needed to determine the exact impact of noise on the workers. Technical and organizational measures in order to control noise and prevent noise exposure, and general hearing conservation program to protect workers, should be introduced in printing industry.

  19. Why good companies go bad.

    PubMed

    Sull, D N

    1999-01-01

    One of the most common business phenomena is also one of the most perplexing: when successful companies face big changes, they often fail to respond effectively. Many assume that the problem is paralysis, but the real problem, according to Donald Sull, is active inertia--an organization's tendency to persist in established patterns of behavior. Most leading businesses owe their prosperity to a fresh competitive formula--a distinctive combination of strategies, relationships, processes, and values that sets them apart from the crowd. But when changes occur in a company's markets, the formula that brought success instead brings failure. Stuck in the modes of thinking and working that have been successful in the past, market leaders simply accelerate all their tried-and-true activities. In attempting to dig themselves out of a hole, they just deepen it. In particular, four things happen: strategic frames become blinders; processes harden into routines; relationships become shackles; and values turn into dogmas. To illustrate his point, the author draws on examples of pairs of industry leaders, like Goodyear and Firestone, whose fates diverged when they were forced to respond to dramatic changes in the tire industry. In addition to diagnosing the problem, Sull offers practical advice for avoiding active inertia. Rather than rushing to ask, "What should we do?" managers should pause to ask, "What hinders us?" That question focuses attention on the proper things: the strategic frames, processes, relationships, and values that can subvert action by channeling it in the wrong direction.

  20. 20. Photocopy of Drawing No. 6A3249, 16 December 1914 (Original ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. Photocopy of Drawing No. 6A32-49, 16 December 1914 (Original held by Detroit Edison Company, Detroit, Michigan) CROSS SECTIONS JJ & KK - Detroit Edison Hart Substation, 11736 East Vernor, Detroit, MI