Science.gov

Sample records for edison company plant

  1. Metropolitan Edison Company switching and tagging procedure

    SciTech Connect

    Slater, H.J.

    1980-05-01

    Metropolitan Edison Company provides service to over 350,000 customers in an area diagonally across Southeastern Pennsylvania from North of Stroudsburg near the New York State line to the Maryland border South of Gettysburg. This area encompasses 3300 square miles, 7% of Pennsylvania, and includes all or part of 14 counties. Dispatching organization, safety factors, tagging list and switching are discussed.

  2. Demonstration of natural gas reburn for NO{sub x} emissions reduction at Ohio Edison Company`s cyclone-fired Niles Plant Unit Number 1

    SciTech Connect

    Borio, R.W.; Lewis, R.D.; Koucky, R.W.; Lookman, A.A.; Manos, M.G.; Corfman, D.W.; Waddingham, A.L.; Johnson, S.A.

    1996-04-01

    Electric utility power plants account for about one-third of the NO{sub x} and two-thirds of the SO{sub 2} emissions in the US cyclone-fired boilers, while representing about 9% of the US coal-fired generating capacity, emit about 14% of the NO{sub x} produced by coal-fired utility boilers. Given this background, the Environmental Protection Agency, the Gas Research Institute, the Electric Power Research Institute, the Pittsburgh Energy Technology Center, and the Ohio Coal Development Office sponsored a program led by ABB Combustion Engineering, Inc. (ABB-CE) to demonstrate reburning on a cyclone-fired boiler. Ohio Edison provided Unit No. 1 at their Niles Station for the reburn demonstration along with financial assistance. The Niles Unit No. 1 reburn system was started up in September 1990. This reburn program was the first full-scale reburn system demonstration in the US. This report describes work performed during the program. The work included a review of reburn technology, aerodynamic flow model testing of reburn system design concepts, design and construction of the reburn system, parametric performance testing, long-term load dispatch testing, and boiler tube wall thickness monitoring. The report also contains a description of the Niles No. 1 host unit, a discussion of conclusions and recommendations derived from the program, tabulation of data from parametric and long-term tests, and appendices which contain additional tabulated test results.

  3. 76 FR 9348 - Southern California Edison Company, Pacific Gas and Electric Company, San Diego Gas & Electric...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-17

    ... Energy Regulatory Commission Southern California Edison Company, Pacific Gas and Electric Company, San Diego Gas & Electric Company; Notice of Petition Take notice that on January 31, 2011, pursuant to section 210(h)(2) of the Public Utility Regulatory Policies Act of 1978 (PURPA),\\1\\ Southern...

  4. 75 FR 28604 - Southern California Edison Company; Pacific Gas and Electric Company; San Diego Gas & Electric...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-21

    ... May 11, 2010, pursuant to Rule 207 of the Rules of Practice and Procedure of the Federal Energy... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Southern California Edison Company; Pacific Gas and Electric Company;...

  5. 77 FR 5787 - Consumers Energy Company, Detroit Edison Company; Notice of Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-06

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Consumers Energy Company, Detroit Edison Company; Notice of Application... hydroelectric application has been filed with the Commission and is available for public inspection: a. Types...

  6. Performance of the Southern California Edison Company Stirling dish

    SciTech Connect

    Lopez, C.W.; Stone, K.W.

    1993-10-01

    McDonnell Douglas Astronautics Company (MDAC) and United Stirling AB of Sweden (USAB) formed a joint venture in 1982 to develop and produce a Stirling dish solar generating system. In this report, the six year development and testing program continued by the Southern California Edison Company (SCE) is described. Each Stirling dish module consists of a sun tracking dish concentrator developed by the MDAC and a Stirling engine driven power conversion unit (PCU) developed by USAB. The Stirling dish system demonstrated twice the peak and daily solar-to-electric conversion efficiency of any other system then under development. This system continues to set the performance standard for solar to electric systems being developed in the early 1990`s. Test data are presented and used to estimate the performance of a commercial system.

  7. 75 FR 10836 - Firstenergy Nuclear Operating Company, Firstenergy Nuclear Generation Corp., Ohio Edison Company...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-09

    ... environment 75 FR 6736; dated February 10, 2010. This exemption is effective upon issuance. Dated at Rockville..., the Toledo Edison Company, Beaver Valley Power Station, Unit Nos. 1 And 2; Exemption 1.0 Background... and NPF-73, which authorizes operation of the Beaver Valley Power Station, Unit Nos. 1 and 2...

  8. 75 FR 69136 - Southern California Edison Company, San Onofre Nuclear Generating Station, Units 2 and 3...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-10

    ... 73, Power Reactor Security Requirements, March 27, 2009; 74 FR 13926). Thus, through the proposed... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Southern California Edison Company, San Onofre Nuclear Generating Station, Units 2 and...

  9. 77 FR 70487 - Southern California Edison Company; Establishment of Atomic Safety and Licensing Board

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-26

    ... COMMISSION Southern California Edison Company; Establishment of Atomic Safety and Licensing Board Pursuant to delegation by the Commission, see 37 FR 28,710 (Dec. 29, 1972), and the Commission's regulations, see 10 CFR... rule (10 CFR 2.302), which the NRC promulgated in August 2007 (72 FR 49,139). ] Issued at...

  10. 75 FR 81316 - Detroit Edison Company; FERMI 2; Environmental Assessment and Finding of No Significant Impact

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-27

    ... Edison Company (the licensee), for operation of Fermi 2, located in Monroe County, Michigan. Therefore... County due to a storm front moving through southeast Michigan. At 0238 hours, a tornado swept across the... does not have any foreseeable impacts to land, air, or water resources, including impacts to biota....

  11. 76 FR 21735 - Solutions for Utilities, Inc.v. Pacific Gas and Electric Company, Southern California Edison...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-18

    ... Energy Regulatory Commission Solutions for Utilities, Inc.v. Pacific Gas and Electric Company, Southern California Edison Company, San Diego Gas & Electric Company, California Public Utilities Commission; Notice of Petition Take notice that on March 21, 2011, pursuant to section 210(h)(2) of the Public...

  12. 76 FR 29744 - Monongahela Power Company, West Penn Power Company, The Potomac Edison Company, PJM...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-23

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Monongahela Power Company, West Penn Power Company, The Potomac... FirstEnergy Utilities), and PJM Interconnection, L.L.C. filed a joint petition requesting that...

  13. 78 FR 3470 - DTE Electric Company (Formerly the Detroit Edison Company), Notice of Availability of Final...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-16

    ... Environmental Impact Statement for a Combined License for Unit 3 at the Enrico Fermi Atomic Power Plant Site... Combined License (COL) for Enrico Fermi Unit 3.'' The site is located in Monroe County, Michigan. The... conduct the scoping process was published in the Federal Register on December 10, 2008 (73 FR...

  14. Edison vs. Tesla

    ScienceCinema

    Hogan, Kathleen; Wallace, Hal; Ivestor, Rob

    2016-07-12

    As Edison vs. Tesla week heats up at the Energy Department, we are exploring the rivalry between Thomas Edison and Nikola Tesla and how their work is still impacting the way we use energy today. Whether you're on Team Tesla or Team Edison, both inventors were key players in creating things like batteries, power plants and wireless technologies -- all innovations we still use today. And as we move toward a clean energy future, energy efficient lighting, like LED bulbs, and more efficient electric motors not only help us save money on electricity costs but help combat climate change. For this, Tesla and Edison both deserve our recognition.

  15. Edison vs. Tesla

    SciTech Connect

    Hogan, Kathleen; Wallace, Hal; Ivestor, Rob

    2013-11-20

    As Edison vs. Tesla week heats up at the Energy Department, we are exploring the rivalry between Thomas Edison and Nikola Tesla and how their work is still impacting the way we use energy today. Whether you're on Team Tesla or Team Edison, both inventors were key players in creating things like batteries, power plants and wireless technologies -- all innovations we still use today. And as we move toward a clean energy future, energy efficient lighting, like LED bulbs, and more efficient electric motors not only help us save money on electricity costs but help combat climate change. For this, Tesla and Edison both deserve our recognition.

  16. Outages of electric power supply resulting from cable failures Boston Edison Company system

    SciTech Connect

    1980-07-01

    Factual data are provided regarding 5 electric power supply interruptions that occurred in the Boston Metropolitan area during April to June, 1979. Common to all of these outages was the failure of an underground cable as the initiating event, followed by multiple equipment failures. There was significant variation in the voltage ratings and types of cables which failed. The investigation was unable to delineate a single specific Boston Edison design operating or maintenance practice that could be cited as the cause of the outages. After reviewing the investigative report the following actions were recommended: the development and implementation of a plan to eliminate the direct current cable network; develop a network outage restoration plan; regroup primary feeder cables wherever possible to minimize the number of circuits in manholes, and to separate feeders to high load density areas; develop a program to detect incipient cable faults; evaluate the separation of the north and south sections of Back Bay network into separate networks; and, as a minimum, install the necessary facilities to make it possible to re-energize one section without interfering with the other; and re-evaluate the cathodic protection scheme where necessary. (LCL)

  17. Illuminating Systems: Edison and Electrical Incandescence.

    ERIC Educational Resources Information Center

    Sanford, Greg

    1989-01-01

    Traces the life and inventions of Thomas A. Edison up to the invention of electrical incandescent lighting in 1881. Focuses on the process that Edison followed in developing incandescent lighting, including financial aspects, other competitors in the field, and the eventual establishment of the Edison Electric Light Companies. (RW)

  18. Zebra Mussel control experiences at Detroit Edison Harbor Beach Power Plant

    SciTech Connect

    Harwood, D.B.; Buda, D.J.

    1994-12-31

    The Detroit Edison Co. Harbor Beach Power Plant on Lake Huron in Michigan`s thumb and is comprised of one 100 MW coal-fired unit. Zebra mussels first were discovered during a routine inspection of the plant screen house in August 1991. The initial population of 5 mussels/m{sup 2} increased to 650 mussels/m{sup 2} by March 1992. During this eight-month period the plant began to experience problems with zebra mussels clogging small coolers, check valves, and miscellaneous service water connections. Although the mussels had not affected the unit`s availability, it was evident that they soon might if left uncontrolled. A treatment program was devised in 1992 to eliminate the mussels living in the screen house and inside the plant. Targeted in-plant systems included the condenser cooling supply lines, plant service water system, and plant fire fighting system. An oxygen scavenger (sodium sulfate) was used in conjunction with thermal treatment (saturated steam) to asphyxiate and heat the mussels over a several day period. Inspection dives in the screen house before and after treatment as well as subsequent in-plant equipment inspections have revealed the treatment to be successful. Complete mortality was achieved in the screen house and in-plant systems. By April, 1993, the zebra mussel colony had re-established itself in the plant screen house to a level of 400 mussels/m{sup 2}. In October 1993, the colony had grown to 2,600 mussels/m{sup 2}. A second treatment was scheduled and completed on October 18--21, 1993. Thermal treatment was used alone during this treatment episode in which 100% mortality again wax achieved. Test bags, an in-line viewport, and post treatment dive inspections confirmed that the treatment was completely successful. Population monitoring and treatments continue on a regular basis.

  19. 76 FR 66998 - Detroit Edison Company; Notice of Availability of Draft Environmental Impact Statement for a...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-28

    ... December 10, 2008 (73 FR 75142). Any interested party may submit comments on the draft EIS for... Combined License for Unit 3 at the Enrico Fermi Atomic Power Plant Site Notice is hereby given that the...

  20. 76 FR 56820 - Detroit Edison Company, Fermi 2; Environmental Assessment and Finding of No Significant Impact

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-14

    ... safety of ERO personnel when responding to the site due to the increase in population and redistribution... the plant was first licensed. Additional delays may occur in the future based on continued population growth. Improvements have been made to equipment, procedures, and training since initial approval of...

  1. 75 FR 11946 - Detroit Edison Company; FERMI 2; Environmental Assessment and Finding of No Significant Impact

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-12

    ... operation of the Fermi 2, located in Monroe County, Michigan. In accordance with 10 CFR 51.21, the NRC... physical changes to the reactor, fuel, plant structures, support structures, water, or land at the Fermi 2... revisions to 10 CFR Part 73 as discussed in a Federal Register notice dated March 27, 2009 (74 FR...

  2. 75 FR 6736 - FirstEnergy Nuclear Operating Company, FirstEnergy Nuclear Generation Corp., Ohio Edison Company...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-10

    ... FR 13967). There will be no change to radioactive effluents that affect radiation exposures to plant... [Part 73, Power Reactor Security Requirements, 74 FR 13926, 13967 (March 27, 2009)]. The licensee... Statement for BVPS-1, dated July 1973, and for BVPS-2, NUREG-1094, dated September 1985, as...

  3. Room used at one point by Charles Edison, the inventor's ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Room used at one point by Charles Edison, the inventor's son, as his office while president of the Edison companies in the 1930s. The large metal tanks to the right are part of a modern halon gas fire suppression system for the building. - Thomas A. Edison Laboratories, Building No. 5, Main Street & Lakeside Avenue, West Orange, Essex County, NJ

  4. Development of high temperature, corrosion resistant polymer concrete for use in the steam distribution system of the Consolidated Edison Company of New York. Final report

    SciTech Connect

    Webster, R.P.; Kukacka, L.E.; Reams, W.; Miller, C.A.

    1994-11-01

    The results of a research program conducted by Brookhaven National Laboratory (BNL) to evaluate and develop polymer concrete (PC) materials, which can be used as an alternative material of construction to conventional steel-reinforced portland cement concrete (PCC) within the steam distribution system of Consolidated Edison Company of New York (Con Ed), are presented. Three fiber-reinforced PC systems were identified and evaluated in a series of laboratory and in situ field tests. Based upon the results of these tests preliminary design studies were performed by BNL and the Con Ed Civil Design Division to determine the necessary floor slab, wall and roof thicknesses required to replace a typical steel reinforced PCC manhole with a fiber-reinforced PC manhole.

  5. Health Hazard Evaluation Report HETA 81-369-1591, HETA 81-466-1591, Electric Machinery - McGraw Edison Company, Minneapolis, Minnesota

    SciTech Connect

    Stephenson, R.L.; Murphy, D.C.; Habes, D.J.

    1985-04-01

    Environmental and breathing zone samples were analyzed for amines, aliphatic aldehydes, boron-trifluoride-monoethylamine, epichlorohydrin, total volatile fluorides, formaldehyde, lead, methyl- tetrahydrophthalic-anhydride, and n-butyl-glycidyl-ether at Electric Machinery/McGraw Edison Company, Minneapolis, Minnesota in December, 1981 and February, 1983. The surveys were requested by the union local because of irritative symptoms and respiratory problems reported by employees exposed to epoxy resin compounds and impregnated materials. The authors conclude that mucous membrane irritation and dermatitis are common among workers exposed to epoxy resins. A high prevalence of carpal tunnel syndrome was also found. Recommendations include reducing formaldehyde concentrations, using personal protective equipment and barrier creams, and maintaining proper work practices and good personal hygiene to minimize contact with epoxy resin materials.

  6. Detroit Edison conquers zebra mussels

    SciTech Connect

    Harwood, D.B.; Buda, D.J. )

    1993-11-01

    A potentially troublesome zebra mussel infestation at Detroit Edison's Harbor Beach Power Plant was nipped in time. Reducing the oxygen content of water inside the plant's water systems and using steam to thermally treat a colony of mussels that was established in the plant's screenhouse prevented the problem. So successful was the temperature treatment that it will be used regularly as part of the plant's annual mussel removal program.

  7. Management of Southern California Edison`s NOx reduction program in a changing regulatory environment

    SciTech Connect

    Estrada, J.C.; Hoffman, D.R.; Johnson, L.W.; Kimoto, E.M.; Petrucelli, A.; Zamorano, D.

    1995-12-31

    The Southern California Edison Company (Edison) is a privately owned electric utility serving customers in a twelve county area of Southern California. Beginning in 1989, Edison initiated a major effort, within the Los Angeles air quality basin, to significantly reduce generating station emissions of the oxides of nitrogen (NOx). Since this program began, there have been numerous changes to the local, state and regional air quality regulations under which Edison operates. As a result, the program has evolved and expanded to include most of the fossil fuel generating units within the Edison service territory. Edison has attempted to meet these regulatory changes in the most cost effective manner. Using a variety of NOx control mechanisms, implemented throughout the period, Edison has taken a flexible approach to incorporating the latest technological developments. At the same time, lessons learned during each phase have been factored into succeeding phases of the program. Now that most of the NOx control devices have been installed and several years of operating experience have been gained, Edison would like to share that experience so that others might gain additional knowledge which may help in their NOx control programs. The major areas which will be addressed include (1) new developments, (2) contracting strategy, (3) project management and (4) an overview of operating experiences and results with Urea Injection (SNCR), Low NOx Burners (LNB), Flue Gas Recirculation and Selective Catalytic Reduction (SCR) systems.

  8. 76 FR 77855 - Detroit Edison Company; Notice of Availability of Errata Sheet for the Draft Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-14

    ..., 2011 (76 FR 66998). The U.S. Environmental Protection Agency's NOA was also published on October 28, 2011 (76 FR 66925). The purpose of this notice is to inform the public of the contents of the errata... Statement for a Combined License for Unit 3 at the Enrico Fermi Atomic Power Plant Site Notice is...

  9. Health hazard evaluation report No. HHE-80-233-793, Davis Bessie Nuclear Power Station, Toledo Edison Company, United Engineers and Contractors Company (UE and C), Oak Harbor, Ohio

    SciTech Connect

    Cone, J.; Hartle, R.

    1981-01-01

    Personal air samples were analyzed and employees were given medical evaluations at Davis Bessie Nuclear Power Station (SIC-4911) in Oak Harbor, Ohio. Requests for evaluation were made by a union representative of the United Engineers and Contractors and a union representative of employees of Toledo Edison Company, working on site at the power station, to evaluate employee skin and scalp problems due to exposure to ceramic wood fibers. Preliminary surveys were conducted on September 24 and 25, 1980 and a follow-up survey was performed on October 16, 1980. Environmental evaluation consisted of gravimetric analyses of personal air samples for airborne ceramic wool fibers. A total of 400 production and maintenance workers and varying numbers of construction workers were exposed to the fibers during installation of insulation which was completed at the time of the survey. The three personal air samples showed no accumulation of particulates and fibers detected were nonrespirable. Medical evaluations were conducted in 52 workers and scalp scrapings were obtained from 43 workers. Thirty seven workers had histories suggestive of irritant dermatitis of the scalp; 24 workers had physical findings consistent with the diagnosis. Of the 43 scalp samples, 18 were contaminated with organisms of the gut, perineum, skin or respiratory tract. Dermatitis was directly related to the history of dust exposure. The authors conclude that a potential health hazard exists for employees from exposure to ceramic wool fiber. Recommendations include provision of handwashing facilities and protective clothing for employees, and installation of an impermeable covering for the ceramic wool fiber.

  10. Edison's Geothermal Program - 1980 Update

    SciTech Connect

    Crane, George K.

    1980-12-01

    In 1975, negotiations were initiated with two major resource developers toward initiating power plant projects at three of the Imperial Valley resource areas, Brawley, Salton Sea and Heber. The projects at Brawley and Salton Sea are substantially different from that at Heber in objective, size and design. The reasons for these differences are related to the different nature of the geothermal brines and to different operating philosophies of the resource developers involved. The projects at Brawley and Salton Sea include the construction and operation by Edison of 10 MW (gross) units. The contracts with the field developer for these resources are such that Edison will purchase steam. It is, therefore, the developer's responsibility to drill and complete the geothermal production and injection wells, and to construct and operate the steam separators and flash vessels, brine processing equipment, injection pumps, and steam scrubbing equipment. These units are 10 MW rather than 50 to 100 MW due to the technical risks associated with producing, handling and injecting the very high salinity brines at these locations. In addition, the reliability of turbine operation with relatively impure steam is a major concern. The Heber plant, on the other hand, will utilize a much cleaner resource. The technical risk is, therefore, judged to be substantially lower. The plant at Heber will be a commercial 45 MW unit. Edison will buy brine, and will own and operate all of the brine handling equipment except for the wells and collection manifolds.

  11. Bringing Edison to Light.

    ERIC Educational Resources Information Center

    Barbato, Joseph

    1979-01-01

    The papers of Thomas A. Edison will be compiled and published in a 20-year project under the sponsorship of the National Park Service, the New Jersey Historical Commission, the Smithsonian Institution, and Rutgers University. This effort, the Thomas A. Edison Papers Project, and its background are described. (JMD)

  12. Edison's vacuum technology patents

    NASA Astrophysics Data System (ADS)

    Waits, Robert K.

    2003-07-01

    During 1879 Thomas Edison's Menlo Park, New Jersey laboratory developed the means to evacuate glass lamp globes to less than a mTorr in 20 min and in mid-1880 began production of carbon-filament incandescent lamps. Among Edison's nearly 1100 U.S. patents are five for vacuum pump improvements, and at least eight others that are vacuum-related; all applied for between 1880 and 1886. Inspired by an 1878 article by De La Rue and Müller [Philos. Trans. R. Soc. London, Ser. A 169, 155 (1878)] on studies of glow discharges, Edison devised a combination pump using the Geissler pump as a rough pump and the Sprengel pump for continuous exhaustion. Edison's patents described means to control the mercury flow and automate the delivery of the mercury to banks of up to a hundred pumps. Other patents described various means to remove residual gases during lamp processing.

  13. Practicing like Thomas Edison.

    PubMed

    Baum, Neil; Ornstein, Hal

    2013-01-01

    For many centuries, medicine has practiced in a vacuum, and the healthcare profession has been isolated from other scientific disciplines. Beginning in the 20th century, doctors and scientists have looked to others for ideas, suggestions, innovations, and new technologies. Probably no one in the past hundred years has done so much to change the world than Thomas Edison. This article will discuss eight principles of Edison and how they may apply to our profession and our practices. PMID:23866659

  14. Practicing like Thomas Edison.

    PubMed

    Baum, Neil; Ornstein, Hal

    2013-01-01

    For many centuries, medicine has practiced in a vacuum, and the healthcare profession has been isolated from other scientific disciplines. Beginning in the 20th century, doctors and scientists have looked to others for ideas, suggestions, innovations, and new technologies. Probably no one in the past hundred years has done so much to change the world than Thomas Edison. This article will discuss eight principles of Edison and how they may apply to our profession and our practices.

  15. 1. NORTH IDAHO PHOSPHATE COMPANY PLANTS. VIEW IS TO THE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. NORTH IDAHO PHOSPHATE COMPANY PLANTS. VIEW IS TO THE NORTHEAST, WITH THE SHIPPING AND STORAGE WAREHOUSE, AMMONIUM PHOSPHATE FERTILIZER PLANT, AND PHOSPHORIC ACID PLANT APPEARING IN SUCCESSION DOWN GOVERNMENT GULCH. - North Idaho Phosphate Company, Silver King Community, Kellogg, Shoshone County, ID

  16. Happy Birthday, Thomas Edison!

    ERIC Educational Resources Information Center

    Dalton, Edward A.

    1997-01-01

    Discusses the work and inventions of Thomas Edison and their use in making teachers and students aware of the importance of electrotechnology in their lives and in their futures. Enables students to learn about science, experimentation, research, the process of invention, and the thrill of discovery. Describes educational resources available from…

  17. 8. SOUTH PLANT SHELL OIL COMPANY FACILITIES, WITH PIPELINE PEDESTALS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. SOUTH PLANT SHELL OIL COMPANY FACILITIES, WITH PIPELINE PEDESTALS IN FOREGROUND. VIEW TO SOUTHWEST. - Rocky Mountain Arsenal, Bounded by Ninety-sixth Avenue & Fifty-sixth Avenue, Buckley Road, Quebec Street & Colorado Highway 2, Commerce City, Adams County, CO

  18. 51. SOUTH PLANT PROCESS PIPING, WITH SHELL OIL COMPANY BUILDINGS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    51. SOUTH PLANT PROCESS PIPING, WITH SHELL OIL COMPANY BUILDINGS IN BACKGROUND. VIEW TO NORTH. - Rocky Mountain Arsenal, Bounded by Ninety-sixth Avenue & Fifty-sixth Avenue, Buckley Road, Quebec Street & Colorado Highway 2, Commerce City, Adams County, CO

  19. 72. SOUTH PLANT SHELL OIL COMPANY COMPLEX, FROM CHEMICAL STORAGE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    72. SOUTH PLANT SHELL OIL COMPANY COMPLEX, FROM CHEMICAL STORAGE TANK. VIEW TO WEST. - Rocky Mountain Arsenal, Bounded by Ninety-sixth Avenue & Fifty-sixth Avenue, Buckley Road, Quebec Street & Colorado Highway 2, Commerce City, Adams County, CO

  20. Inspiration, Perspiration, and Time: Operations and Achievement in Edison Schools

    ERIC Educational Resources Information Center

    Gill, Brian P.; Hamilton, Laura S.; Lockwood, J. R.; Marsh, Julie A.; Zimmer, Ron W.; Hill, Deanna; Pribesh, Shana

    2005-01-01

    New forms of governing and managing public schools have proliferated in recent years, spawning the establishment and growth of companies that operate public schools under contract. Among these education management organizations, or EMOs, the largest and most visible is Edison Schools, Inc., with a nationwide network in 2004-2005 of 103 managed…

  1. OUT Success Stories: Solar Trough Power Plants

    DOE R&D Accomplishments Database

    Jones, J.

    2000-08-01

    The Solar Electric Generating System (SEGS) plants use parabolic-trough solar collectors to capture the sun's energy and convert it to heat. The SEGS plants range in capacity from 13.8 to 80 MW, and they were constructed to meet Southern California Edison Company's periods of peak power demand.

  2. 78 FR 69661 - Michael Canales v. Edison International, EIX, Southern California Edison; Notice of Complaint

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-20

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Michael Canales v. Edison International, EIX, Southern California Edison....1, Michael Canales (Complainant) filed a formal complaint against Edison International, EIX...

  3. 126. JOB NO. X98396, PLANT LAYOUT, FORD MOTOR COMPANY LONG ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    126. JOB NO. X9-8396, PLANT LAYOUT, FORD MOTOR COMPANY LONG BEACH ASSEMBLY PLANT, MARCH 1940. - Ford Motor Company Long Beach Assembly Plant, Assembly Building, 700 Henry Ford Avenue, Long Beach, Los Angeles County, CA

  4. 75 FR 6224 - Northern States Power Company of Minnesota; Monticello Nuclear Generating Plant Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-08

    ... COMMISSION Northern States Power Company of Minnesota; Monticello Nuclear Generating Plant Environmental... Northern States Power Company of Minnesota (NSPM) for operation of Monticello Nuclear Generating Plant... Project Manager, Plant Licensing Branch III-1, Division of Operating Reactor Licensing, Office of...

  5. 12. SOUTH PLANT FROM SHELL OIL COMPANY CHEMICAL STORAGE TANK, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. SOUTH PLANT FROM SHELL OIL COMPANY CHEMICAL STORAGE TANK, SHOWING FACILITIES MAINTENANCE BUILDING (543) AT LEFT AND WHITE PHOSPHOROUS FILLING BUILDING (541) AND WAREHOUSE (542) AT CENTER. VIEW TO SOUTHWEST. - Rocky Mountain Arsenal, Bounded by Ninety-sixth Avenue & Fifty-sixth Avenue, Buckley Road, Quebec Street & Colorado Highway 2, Commerce City, Adams County, CO

  6. 73. DETAIL OF SOUTH PLANT SHELL OIL COMPANY COMPLEX FROM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    73. DETAIL OF SOUTH PLANT SHELL OIL COMPANY COMPLEX FROM CHEMICAL STORAGE TANK. VIEW TO WEST. - Rocky Mountain Arsenal, Bounded by Ninety-sixth Avenue & Fifty-sixth Avenue, Buckley Road, Quebec Street & Colorado Highway 2, Commerce City, Adams County, CO

  7. Commonwealth Edison Company pressure locking test report

    SciTech Connect

    Bunte, B.D.; Kelly, J.F.

    1996-12-01

    Pressure Locking is a phenomena which can cause the unseating thrust for a gate valve to increase dramatically from its typical static unseating thrust. This can result in the valve actuator having insufficient capability to open the valve. In addition, this can result in valve damage in cases where the actuator capability exceeds the valve structural limits. For these reasons, a proper understanding of the conditions which may cause pressure locking and thermal binding, as well as a methodology for predicting the unseating thrust for a pressure locked or thermally bound valve, are necessary. This report discusses the primary mechanisms which cause pressure locking. These include sudden depressurization of piping adjacent to the valve and pressurization of fluid trapped in the valve bonnet due to heat transfer. This report provides a methodology for calculating the unseating thrust for a valve which is pressure locked. This report provides test data which demonstrates the accuracy of the calculation methodology.

  8. Edison Home Community Study Unit.

    ERIC Educational Resources Information Center

    Lee County School District, Ft. Myers, FL. Dept. of Environmental Education and Instructional Development Services.

    History is not merely events that occurred in the past. The past has influenced the present, as the present will influence the future. The purpose of this community study unit is to provide fourth grade students with an opportunity to investigate some of the history of Lee County, Florida. The unit's focus is on Thomas Edison, who built a home in…

  9. 75 FR 11937 - General Motors Company, Lordstown Stamping Plant, Warren, OH; Notice of Termination of Investigation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-12

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF LABOR Employment and Training Administration General Motors Company, Lordstown Stamping Plant, Warren, OH; Notice... workers of General Motors Company, Lordstown Stamping Plant, Warren, Ohio. The petitioning group...

  10. The Salton Sea 10 MWe power plant, unit 1

    SciTech Connect

    Moss, W.E.; Whitescarver, O.D.; Yamasaki, R.N.

    1982-10-01

    The Southern California Edison Company's Salton Sea Geothermal Electric Project is the second of two flashsteam projects located in the Imperial Valley of California to successfully demonstrate the feasibility of utilizing steam from highly saline geothermal fluids for electric power generation. The objective of Edison's Power Plant Unit 1 program at the Salton Sea KGRA is to develop design, operating, and economic criteria for commercial geothermal developments in the Imperial Valley of California. The Edison plant is designed specifically for utilization of geothermal steam and employs principles found in conventional fossil-fueled electric generating plants. This plant serves as a model of a full scale commercial plant, using systems and components which likely will be utilized in large scale follow-on units.

  11. Edison Demonstration of Smallsat Networks

    NASA Technical Reports Server (NTRS)

    Westley, Deborah; Martinez, Andres; Petro, Andrew

    2015-01-01

    The goal of NASA's Edison Demonstration of Smallsat Networks (EDSN) mission is to demonstrate interactive satellite swarms capable of collecting, exchanging and transmitting multi-point scientific measurements. Satellite swarms enable a wide array of scientific, commercial and academic research not achievable with a single satellite. The EDSN satellites are scheduled to be launched into space as secondary payloads on the first flight of the Super Strypi launch vehicle no earlier than Oct. 29, 2015.

  12. New Jersey's Thomas Edison and the fluoroscope.

    PubMed

    Tselos, G D

    1995-11-01

    Thomas Edison played a major role in the development of early x-ray technology in 1896, notably increasing tube power and reliability and making the fluoroscope a practical instrument. Eventually, Edison would move x-ray technology from the laboratory to the marketplace.

  13. A Model Technology Educator: Thomas A. Edison

    ERIC Educational Resources Information Center

    Pretzer, William S.; Rogers, George E.; Bush, Jeffery

    2007-01-01

    Reflecting back over a century ago to the small village of Menlo Park, New Jersey provides insight into a remarkable visionary and an exceptional role model for today's problem-solving and design-focused technology educator: Thomas A. Edison, inventor, innovator, and model technology educator. Since Edison could not simply apply existing knowledge…

  14. New Jersey's Thomas Edison and the fluoroscope.

    PubMed

    Tselos, G D

    1995-11-01

    Thomas Edison played a major role in the development of early x-ray technology in 1896, notably increasing tube power and reliability and making the fluoroscope a practical instrument. Eventually, Edison would move x-ray technology from the laboratory to the marketplace. PMID:8570105

  15. 75 FR 14638 - FirstEnergy Nuclear Operating Company; Perry Nuclear Power Plant; Environmental Assessment and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-26

    ... COMMISSION FirstEnergy Nuclear Operating Company; Perry Nuclear Power Plant; Environmental Assessment and...Energy Nuclear Operating Company (FENOC, the licensee), for operation of the Perry Nuclear Power Plant... Manager, Plant Licensing Branch III-2, Division of Operating Reactor Licensing, Office of Nuclear...

  16. 75 FR 8152 - Pacific Gas and Electric Company; Diablo Canyon Power Plant Environmental Assessment and Finding...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-23

    ... COMMISSION Pacific Gas and Electric Company; Diablo Canyon Power Plant Environmental Assessment and Finding... Pacific Gas and Electric Company (PG&E, the licensee), for operation of the Diablo Canyon Power Plant... the Nuclear Regulatory Commission. James R. Hall, Senior Project Manager, Plant Licensing Branch...

  17. 76 FR 41530 - Connecticut Yankee Atomic Power Company, Haddam Neck Plant; Notice of Consideration of Approval...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-14

    ... COMMISSION Connecticut Yankee Atomic Power Company, Haddam Neck Plant; Notice of Consideration of Approval of... Safeguards, U.S. Nuclear Regulatory Commission, Washington, DC 20555. Telephone: 301-492-3571; fax number... Atomic Power Company (CYAPCO), as owner and licensed operator of the Haddam Neck Plant. According to...

  18. The Edison Environmental Center Permeable Pavement Site

    EPA Science Inventory

    This a presentation for a Community Outreach Event called "Chemistry Works and Celebration of International Year of Chemistry." It will review the permeable pavement research project at the Edison Environmental center.

  19. Permeable Pavement Research - Edison, New Jersey

    EPA Science Inventory

    This presentation provides the background and summary of results collected at the permeable pavement parking lot monitored at the EPA facility in Edison, NJ. This parking lot is surfaced with permeable interlocking concrete pavers (PICP), pervious concrete, and porous asphalt. ...

  20. Rival Centennial Casts New Light on Edison.

    ERIC Educational Resources Information Center

    Broad, William J.

    1979-01-01

    Discusses how the celebration of the centennial of the electric lamp raises the claim of the supporters of Sir Joseph Swan in England that Swan not Edison was the first inventor of the light bulb. (HM)

  1. 75 FR 3942 - Carolina Power & Light Company Shearon Harris Nuclear Power Plant, Unit 1 Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-25

    ... COMMISSION Carolina Power & Light Company Shearon Harris Nuclear Power Plant, Unit 1 Environmental Assessment...), for operation of the Shearon Harris Nuclear Power Plant, Unit 1 (HNP), located in New Hill, North... Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Shearon Harris Nuclear......

  2. 75 FR 77919 - Carolina Power & Light Company Shearon Harris Nuclear Power Plant, Unit 1; Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-14

    ... COMMISSION Carolina Power & Light Company Shearon Harris Nuclear Power Plant, Unit 1; Environmental... Progress Energy Carolinas, Inc., for operation of the Shearon Harris Nuclear Power Plant (HNP), Unit 1...: Regarding Shearon Harris Nuclear Power Plant, Unit 1--Final Report (NUREG-1437, Supplement 33).''...

  3. Large loudspeaker horns and crated Edison radios from 1929 are ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Large loudspeaker horns and crated Edison radios from 1929 are stored in a side room on the third floor. - Thomas A. Edison Laboratories, Building No. 5, Main Street & Lakeside Avenue, West Orange, Essex County, NJ

  4. Boards at background, left are displays of parts for Edison ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Boards at background, left are displays of parts for Edison phonographs which were used in management of production and sales promotions. - Thomas A. Edison Laboratories, Building No. 5, Main Street & Lakeside Avenue, West Orange, Essex County, NJ

  5. 75 FR 9958 - Carolina Power & Light Company, Shearon Harris Nuclear Power Plant, Unit 1; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-04

    ... significant effect on the quality of the human environment (75 FR 3942, dated January 25, 2010). This... COMMISSION Carolina Power & Light Company, Shearon Harris Nuclear Power Plant, Unit 1; Exemption 1.0 Background Carolina Power & Light Company (the licensee), now doing business as Progress Energy...

  6. 75 FR 16871 - Carolina Power & Light Company, Brunswick Steam Electric Plant, Units 1 and 2; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-02

    ... significant effect on the quality of the human environment (75 FR 8753, February 25, 2010). This exemption is... COMMISSION Carolina Power & Light Company, Brunswick Steam Electric Plant, Units 1 and 2; Exemption 1.0 Background Carolina Power & Light Company (CP&L, the licensee) is the holder of Facility Operating...

  7. 77 FR 26793 - Florida Power and Light Company, St. Lucie Plant, Unit No. 2, Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-07

    ... significant effect on the quality of the human environment (76 FR 53497; August 26, 2011). This exemption is... COMMISSION Florida Power and Light Company, St. Lucie Plant, Unit No. 2, Exemption 1.0 Background The Florida Power & Light Company (FPL, the licensee) is the holder of Renewed Facility Operating License No....

  8. 76 FR 68512 - Carolina Power & Light Company; H. B. Robinson Steam Electric Plant, Unit 2; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-04

    ... environment (October 26, 2011; 76 FR 6633). This exemption is effective upon issuance. Dated at Rockville... COMMISSION Carolina Power & Light Company; H. B. Robinson Steam Electric Plant, Unit 2; Exemption 1.0 Background Carolina Power & Light Company (the licensee) is the holder of Renewed Facility Operating...

  9. 76 FR 77563 - Florida Power & Light Company; St. Lucie Plant, Unit No. 1; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-13

    ... exemption will not have a significant effect on the quality of the human environment (76 FR 53497; dated... COMMISSION Florida Power & Light Company; St. Lucie Plant, Unit No. 1; Exemption 1.0 Background The Florida Power & Light Company (FPL, the licensee) is the holder of Renewed Facility Operating License No....

  10. 75 FR 16524 - FirstEnergy Nuclear Operating Company, Perry Nuclear Power Plant; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-01

    ... COMMISSION FirstEnergy Nuclear Operating Company, Perry Nuclear Power Plant; Exemption 1.0 Background FirstEnergy Nuclear Operating Company (FENOC, the licensee) is the holder of Facility Operating License No... compliance date (Reference: June 4, 2009, letter from R. W. Borchardt, NRC, to M. S. Fertel, Nuclear...

  11. 76 FR 55422 - Indiana Michigan Power Company; Donald C. Cook Nuclear Plant, Unit 1; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-07

    ... COMMISSION Indiana Michigan Power Company; Donald C. Cook Nuclear Plant, Unit 1; Exemption 1.0 Background Indiana Michigan Power Company (the licensee) is the holder of Facility Operating License No. DPR-58... systems for light-water nuclear power reactors,'' and Appendix K to 10 CFR part 50, ``ECCS...

  12. 76 FR 27669 - Automotive Components Holdings, LLC, a Subsidiary of Ford Motor Company, Saline Plant Division...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-12

    ..., 2010 (75 FR 65514). The workers are engaged in employment related to the production of interior... Employment and Training Administration Automotive Components Holdings, LLC, a Subsidiary of Ford Motor Company, Saline Plant Division, Including Workers Whose Wages Were Reported Under Ford Company,...

  13. Fantasy Seed Company: A Role Playing Game for Plant Breeding Courses

    ERIC Educational Resources Information Center

    Hague, Steve S.

    2011-01-01

    Understanding plant breeding as well as procedures and issues of seed companies are skills students studying agronomy need to acquire. Simulation games can be effective teaching tools in developing higher-order thinking skills of students. The "Fantasy Seed Company" game was developed to create motivated learners by allowing students to run a mock…

  14. DEMONSTRATION OF NATURAL GAS REBURN FOR NOX EMISSIONS REDUCTION AT OHIO EDISON COMPANY'S CYCLONE-FIRED NILES PLANT UNIT NO. 1

    EPA Science Inventory

    The report describes a demonstration of reburning on a cyclone-fired boiler. The project included a review of reburn technology, aerodynamic flow model testing, long-term load dispatch testing, and boiler tube wall thickness monitoring. The report also contains a description of O...

  15. Human-factors control-room-design review draft audit report: Detroit Edison Company, Enrico Fermi Atomic Power Plant--Unit 2

    SciTech Connect

    Savage, J.W.

    1981-08-12

    A human factors audit of the Fermi-2 control room was conducted April 27 through May 1, 1981. This report contains the audit team findings, organized according to the draft NUREG-0700 guidelines sections. The discrepancies identified during the audit are categorized according to their severity and the required schedule for their resolution.

  16. Biofouling monitoring and control program at the Boston Edison Pilgrim Nuclear Station: A twelve year history

    SciTech Connect

    McDonald, D.J.; Armstrong, W.J.; Carucci, C.A.

    1996-08-01

    This paper reviews the history of the Biofouling Monitoring and Control Program at the Boston Edison Company Pilgrim Nuclear Power Station. The program was initially developed in 1982 in response to serious operations, maintenance and performance related problems due to biofouling in both the circulating and service water systems. Although implemented seven years prior to federal mandates under GL 89-13, this program also satisfies regulatory criteria for biofouling monitoring and control of nuclear service water systems. Since its inception, the impact of macrofouling on plant operation and availability has been significantly reduced. Stringent monitoring for blue mussels, installation of mechanical barriers to horseshoe crabs, improvements in screens, screenwash and debris removal systems, and an on-going commitment to biofouling control have reduced the number of condenser backwashes per year from > 40 (1989) to < 10. Depending on conditions and timing of a backwash, the resulting economic gain from this improvement alone can be 1.5 to more than 4 million dollars a year. Other improvements in related components and the service water system have also resulted in reduced maintenance related problems and an additional cost benefit to the plant. 13 refs., 6 figs., 1 tab.

  17. 75 FR 34181 - Connecticut Yankee Atomic Power Company, Haddam Neck Plant, Independent Spent Fuel Storage...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-16

    ... COMMISSION Connecticut Yankee Atomic Power Company, Haddam Neck Plant, Independent Spent Fuel Storage... Regulatory Commission (NRC) is considering issuance of an exemption to Connecticut Yankee Atomic Power... develop training modules under its Systems Approach to Training (SAT) that includes...

  18. Edison upright phonographs are stored throughout the third floor; shown ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Edison upright phonographs are stored throughout the third floor; shown here are also storage cabinets containing parts for 1929 Edison radios. Cabinets also contain partial experimental apparatus from other parts of the laboratory. - Thomas A. Edison Laboratories, Building No. 5, Main Street & Lakeside Avenue, West Orange, Essex County, NJ

  19. 'Music Room,' third floor, is used for storage of Edison ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    'Music Room,' third floor, is used for storage of Edison phonographs; this room was used during the 1920s to audition recording artists and to listen to prospective pieces of music for release on Edison records. - Thomas A. Edison Laboratories, Building No. 5, Main Street & Lakeside Avenue, West Orange, Essex County, NJ

  20. Edison Offers Degrees but No Classes

    ERIC Educational Resources Information Center

    Wald, Matthew L.

    1977-01-01

    Thomas A. Edison College, New Jersey's ninth state college, has awarded associate or bachelor's degrees to more than a thousand students for work completed at other colleges or for knowledge gained on the job or through independent study. It has no faculty, no library and a small office building for a campus--here its evaluation criteria are…

  1. Reading Program at Edison High School.

    ERIC Educational Resources Information Center

    Kennedy, John A.; Kilroy, James C.

    Curriculum planning and course organization of the Edison High School (California) reading program are described. Curriculum planning begins with identification of the reading needs of all incoming students. Group testing of all eighth grade students in local feeder schools in the spring is followed by diagnostic testing of individual strengths…

  2. Permeable pavement research – Edison, New Jersey

    EPA Science Inventory

    These are the slides for the New York City Concrete Promotional Council Pervious Concrete Seminar presentation. The basis for the project, the monitoring design and some preliminary monitoring data from the permeable pavement parking lot at the Edison Environmental Center are pre...

  3. SoCal Edison: up the soft path

    SciTech Connect

    MacLachlan, A.

    1981-03-19

    Chairman William Gould announced late in 1980 that Southern California Edison (SCE) would abandon baseload plants for the near term and seek 1/3 of its capacity additions in the '80s from new and alternate sources. SCE decided that conventional power plants are no longer a viable way to meet anticipated load because of high capital costs and long lead times. The utility's shift to soft technologies will develop hydro, geothermal, and solar power more quickly and with lower cost and higher public support. In nuclear power, Federal and state regulations are no longer blamed for the decision, according to Mr. Gould; but, if the nuclear option is to survive the following must be corrected: institutional barriers that prevent utilities from recovering their investment, accident liability, and lengthy lead times in construction. (DCK)

  4. Status of the Shanghai Coking and Chemical Company`s U-GAS coal gasification plant

    SciTech Connect

    Bryan, B.G.; Hoppe, J.A.

    1998-12-31

    The World`s demand for energy is expected to double in the next twenty-five years. The energy mix for the next century is expected to remain strongly dependent on fossil fuels. With large worldwide coal reserves, coal will continue to play a major role in the World`s energy mix for the foreseeable future. Its use for power generation is expected to expand significantly. It is therefore very important that this coal be used in an efficient, environmentally clean, and economic manner. The Institute of Gas Technology`s U-GAS gasification process is an advanced gasification technology that can meet such a challenge. This paper describes the U-GAS coal gasification technology being used by Shanghai Coking and Chemical Corporation in their chemical facility in Shanghai, China. As part of Shanghai`s Trigeneration (Trigen) coal gasification project, seven of eight available U-GAS gasifiers have been placed in service since the plant began operation in December 1994. These gasifiers are the first commercial-scale U-GAS gasifiers to be installed anywhere in the world. Over 80 performance and production runs have now been logged over the last three and a half years of operation. From the early days of only several hours of continuous operation to today`s over 3,100 hours, significant improvements in plant performance and reliability have been achieved. Modifications and design improvements to the various plant sections are discussed, along with the resulting improvements in gasifier availability and coal conversion efficiency. Despite a strong start in China, the U-GAS technology will require an ongoing development and improvement program to realize widespread commercial deployment in China and other markets. A recently initiated DOE-sponsored program addressing key factors in commercial viability and market definition for U-GAS in China is discussed.

  5. The impact of electric vehicles on the Southern California Edison System

    SciTech Connect

    Ford, A.

    1992-07-01

    This report describes the results of the first phase of an investigation of the impacts of electric vehicles (EVs) in southern California. The investigation focuses on the Southern California Edison Company (SCE) which provides electric service for approximately 60% of southern California. The project is supported by the Air Quality Impacts of Energy Efficiency'' Program of the California Institute for Energy Efficiency (CIEE). The first phase of the research is organized around how EVs might be viewed by customers, vehicle manufacturers and electric utility companies. The vehicle manufacturers' view has been studied with special emphasis on the role of marketable permit systems. The utilities' view of EVs is the subject of this report. The review is particularly important as several case studies of EVs in southern California have been conducted in recent years. The dynamics of a growing population of EVs is explained. Chapter 5 explains a simple method of deriving the electricity demands which could result from the operation of EVs in southern California. The method is demonstrated for several simple examples and then used to find the demands associated with each of the eight EV scenarios. Chapter 6 reports the impacts on SCE operations from the new demands for electricity. Impacts are summarized in terms of system operating costs, reliability of service, and changes in the utility's average electric rate. Chapter 7 turns to the emissions of air pollutants released by the operation of EVs, conventional vehicles (CVs) and power plants. Chapter 8 takes the air pollution analysis one step further by examining the possible reduction in ambient ozone concentration in southern California.

  6. The impact of electric vehicles on the Southern California Edison System. Final report

    SciTech Connect

    Ford, A.

    1992-07-01

    This report describes the results of the first phase of an investigation of the impacts of electric vehicles (EVs) in southern California. The investigation focuses on the Southern California Edison Company (SCE) which provides electric service for approximately 60% of southern California. The project is supported by the ``Air Quality Impacts of Energy Efficiency`` Program of the California Institute for Energy Efficiency (CIEE). The first phase of the research is organized around how EVs might be viewed by customers, vehicle manufacturers and electric utility companies. The vehicle manufacturers` view has been studied with special emphasis on the role of marketable permit systems. The utilities` view of EVs is the subject of this report. The review is particularly important as several case studies of EVs in southern California have been conducted in recent years. The dynamics of a growing population of EVs is explained. Chapter 5 explains a simple method of deriving the electricity demands which could result from the operation of EVs in southern California. The method is demonstrated for several simple examples and then used to find the demands associated with each of the eight EV scenarios. Chapter 6 reports the impacts on SCE operations from the new demands for electricity. Impacts are summarized in terms of system operating costs, reliability of service, and changes in the utility`s average electric rate. Chapter 7 turns to the emissions of air pollutants released by the operation of EVs, conventional vehicles (CVs) and power plants. Chapter 8 takes the air pollution analysis one step further by examining the possible reduction in ambient ozone concentration in southern California.

  7. Reducing Steam Header Pressure Provides Attractive Operating Costs Savings (Nalco Chemical Company Bedford Park Plant)

    SciTech Connect

    none,

    2000-11-01

    Nalco Chemical Company is constantly seeking ways to improve steam system performance. At Nalco's Clearing Plant in Bedford Park, Illinois, changes in some of the plants processes led personnel to evaluate the feasibility of reducing the steam header pressure. The team decided to incrementally decrease header pressure while monitoring the effects of this change on system performance. The pressure was reduced twice, and each time the system was carefully monitored to ensure there was no detrimental impact on system operation.

  8. 75 FR 80547 - Carolina Power & Light Company, Shearon Harris Nuclear Power Plant, Unit No. 1; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-22

    ... FR 13926), establish and update generically applicable security requirements similar to those... FR 77919 dated December 14, 2010). This exemption is effective upon issuance. Dated at Rockville... COMMISSION Carolina Power & Light Company, Shearon Harris Nuclear Power Plant, Unit No. 1; Exemption...

  9. 75 FR 11578 - Northern States Power Company of Minnesota, Monticello Nuclear Generating Plant; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-11

    ... nuclear power reactors against radiological sabotage,'' published March 27, 2009, effective May 26, 2009... nuclear power reactor licensee, licensed under 10 CFR Part 50, shall implement the requirements of this... COMMISSION Northern States Power Company of Minnesota, Monticello Nuclear Generating Plant; Exemption...

  10. 78 FR 42556 - Maine Yankee Atomic Power Company; Maine Yankee Atomic Power Plant Issuance of Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-16

    ... COMMISSION Maine Yankee Atomic Power Company; Maine Yankee Atomic Power Plant Issuance of Environmental... facilities (76 FR 72560; November 23, 2011) (EP Final Rule). The EP Final Rule was effective on December 23, 2011, with various implementation dates for each of the rule changes. Maine Yankee Atomic Power...

  11. 75 FR 8410 - Carolina Power & Light Company: H. B. Robinson Steam Electric Plant, Unit No. 2; Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-24

    ... COMMISSION Carolina Power & Light Company: H. B. Robinson Steam Electric Plant, Unit No. 2; Environmental... Carolina Power & Light Company (the licensee), for operation of the H. B. Robinson Steam Electric Plant... notice dated March 27, 2009 (74 FR 13967). There will be no change to radioactive effluents that...

  12. 77 FR 11173 - Renewal of Facility Operating License No. NPF-30, Union Electric Company, Callaway Plant, Unit 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-24

    ... COMMISSION Renewal of Facility Operating License No. NPF-30, Union Electric Company, Callaway Plant, Unit 1... Electric Company to operate the Callaway Plant, Unit 1 (Callaway), at 3565 megawatts thermal. The renewed... specified in the current license. Callaway is located in Callaway County, Missouri and its current...

  13. 75 FR 80545 - Carolina Power & Light Company; H.B. Robinson Steam Electric Plant, Unit No. 2; Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-22

    ... COMMISSION Carolina Power & Light Company; H.B. Robinson Steam Electric Plant, Unit No. 2; Environmental... Carolina Power & Light Company (the licensee), for operation of the H. B. Robinson Steam Electric Plant... Register notice dated March 27, 2009 (74 FR 13967). There will be no change to radioactive effluents...

  14. 75 FR 15748 - Detroit Edison Company; Fermi 2; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-30

    ... of the U.S. Nuclear Regulatory Commission (NRC, the Commission) now or hereafter in effect. The... those previously imposed by Commission orders issued after the terrorist attacks of September 11, 2001... requested an exemption in accordance with 10 CFR 73.5, ``Specific exemptions.'' The licensee's November...

  15. 76 FR 1197 - Detroit Edison Company, FERMI 2; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-07

    ... ``Each licensee at each site shall conduct an exercise of its onsite emergency plan every 2 years.'' By... emergency plans. In addition, 10 CFR part 50, Appendix E, Section IV.F.2.b also requires licensees to..., Appendix E requires licensees at each site to conduct an exercise of onsite emergency plans biennially...

  16. 76 FR 32238 - Detroit Edison Company, Fermi 2; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-03

    ... implementation date of March 31, 2010, requires licensees to protect, with high assurance, against radiological sabotage by designing and implementing comprehensive site security programs. The amendments to 10 CFR 73.55 published on March 27, 2009 (74 FR 13926), establish and update generically applicable security...

  17. 75 FR 76054 - Detroit Edison Company Fermi, Unit 2; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-07

    ...), located in Monroe County, Michigan. The licensee anticipates using rail to ship radioactive waste. From... report to the NRC if shipments of low-level radioactive waste are not acknowledged by the intended... elapse during shipments of low-level radioactive waste before DECo is required to investigate and file...

  18. One corner of the third floor has examples of Edison ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    One corner of the third floor has examples of Edison motion picture projectors in rather poor condition. Better preserved examples are in storage in Vault #12. - Thomas A. Edison Laboratories, Building No. 5, Main Street & Lakeside Avenue, West Orange, Essex County, NJ

  19. Photocopy of a photograph (original taken for the Edison Co.) ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of a photograph (original taken for the Edison Co.) Unknown, Photographer, 1939 AERIAL VIEW (SOUTH) SHOWING NORTH ELEVATION AND OTHER LABORATORY BUILDINGS AROUND THE COURTYARD - Thomas A. Edison Laboratories, Machine Shop & Library, Main Street & Lakeside Avenue, West Orange, Essex County, NJ

  20. Student Standards for the Primary Academy: The Edison Project.

    ERIC Educational Resources Information Center

    Edison Project, New York, NY.

    The Edison Project provides the design for a new kind of school, one that keeps pace with the social and technological changes children will encounter. The Edison school design, which is highly ambitious and encourages fundamental change in schools, proposes a rich and challenging curriculum for all students; a professional environment for…

  1. Edison Is the Symptom, NCLB Is the Disease

    ERIC Educational Resources Information Center

    Campbell, Peter

    2007-01-01

    Engaging students requires giving them a say in what they learn and how they will learn it. However, in strictly disciplined, rule-bound schools with test-driven curricula, this cannot happen. Edison Schools, Inc., a for-profit Education Management Organization (EMO), and Confluence Academy, an Edison-run school located in one of the most…

  2. Analysis of a homemade Edison tinfoil phonograph.

    PubMed

    Sagers, Jason D; McNeese, Andrew R; Lenhart, Richard D; Wilson, Preston S

    2012-10-01

    Thomas Edison's phonograph was a landmark acoustic invention. In this paper, the phonograph is presented as a tool for education in acoustics. A brief history of the phonograph is outlined and an analogous circuit model that describes its dynamic response is discussed. Microphone and scanning laser Doppler vibrometer (SLDV) measurements were made on a homemade phonograph for model validation and inversion for unknown model parameters. SLDV measurements also conclusively illustrate where model assumptions are violated. The model elements which dominate the dynamic response are discussed.

  3. Analysis of a homemade Edison tinfoil phonograph.

    PubMed

    Sagers, Jason D; McNeese, Andrew R; Lenhart, Richard D; Wilson, Preston S

    2012-10-01

    Thomas Edison's phonograph was a landmark acoustic invention. In this paper, the phonograph is presented as a tool for education in acoustics. A brief history of the phonograph is outlined and an analogous circuit model that describes its dynamic response is discussed. Microphone and scanning laser Doppler vibrometer (SLDV) measurements were made on a homemade phonograph for model validation and inversion for unknown model parameters. SLDV measurements also conclusively illustrate where model assumptions are violated. The model elements which dominate the dynamic response are discussed. PMID:23039413

  4. Detroit Edison's Fermi 1 - Preparation for Reactor Removal

    SciTech Connect

    Swindle, Danny

    2008-01-15

    This paper is intended to provide information about the ongoing decommissioning tasks at Detroit Edison's Fermi 1 plant, and in particular, the work being performed to prepare the reactor for removal and disposal. In 1972 Fermi 1 was shutdown and the fuel returned to the Atomic Energy Commission. By the end of 1975, a retirement plan was prepared, the bulk sodium removed, and the plant placed in a safe store condition. The plant systems were left isolated with the sodium containing systems inert with carbon dioxide in an attempt to form a carbonate layer, thus passivating the underlying reactive sodium. In 1996, Detroit Edison determined to evaluate the condition of the plant and to make recommendations in relation to the Fermi 1 future plans. At the end of 1997 approval was obtained to remove the bulk asbestos and residual alkali-metals (i.e., sodium and sodium potassium (NaK)). In 2000, full nuclear decommissioning of the plant was approved. To date, the bulk asbestos insulation has been removed, and the only NaK remaining is located in six capillary instrument tubes. The remaining sodium is contained within the reactor, two of the three primary loops, and miscellaneous removed pipes and equipment to be processed. The preferred method for removing or reacting sodium at Fermi 1 is by injecting superheated steam into a heated, nitrogen inert system. The byproducts of this reaction are caustic sodium hydroxide, hydrogen gas, and heat. The decision was made to separate the three primary loops from the reactor for better control prior to processing each loop and the reactor separately. The first loop has already been processed. The main focus is now to process the reactor to allow removal and disposal of the Class C waste prior to the anticipated June 2008 closure of the Barnwell radioactive waste disposal facility located in South Carolina. Lessons learnt are summarized and concern: the realistic schedule and adherence to the schedule, time estimates, personnel

  5. Advanced Communication and Control of Distributed Energy Resources at Detroit Edison

    SciTech Connect

    Haukur Asgeirsson; Richard Seguin

    2004-01-31

    The project objective was to create the communication and control system, the process and the economic procedures that will allow owners (e.g., residential, commercial, industrial, manufacturing, etc.) of Distributed Energy Resources (DER) connected in parallel to the electric distribution to have their resources operated in a manner that protects the electric utility distribution network and personnel that may be working on the network. The Distribution Engineering Workstation (DEW) (a power flow and short circuit modeling tool) was modified to calculate the real-time characteristics of the distribution network based on the real-time electric distribution network information and provide DER operating suggestions to the Detroit Edison system operators so that regional electric stability is maintained. Part of the suggestion algorithm takes into account the operational availability of DER’s, which is known by the Energy Aggregator, DTE Energy Technologies. The availability information will be exchanged from DTE Energy Technologies to Detroit Edison. For the calculated suggestions to be used by the Detroit Edison operators, procedures were developed to allow an operator to operate a DER by requesting operation of the DER through DTE Energy Technologies. Prior to issuing control of a DER, the safety of the distribution network and personnel needs to be taken into account. This information will be exchanged from Detroit Edison to DTE Energy Technologies. Once it is safe to control the DER, DTE Energy Technologies will issue the control signal. The real-time monitoring of the DECo system will reflect the DER control. Multi-vendor DER technologies’ representing approximately 4 MW of capacity was monitored and controlled using a web-based communication path. The DER technologies included are a photovoltaic system, energy storage, fuel cells and natural gas/diesel internal combustion engine generators. This report documents Phase I result for the Detroit Edison

  6. 75 FR 54920 - In the Matter of Pacific Gas & Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 and 2...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-09

    ... COMMISSION In the Matter of Pacific Gas & Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 and 2... Operating License Nos. DPR-80 and DPR-82 for the Diablo Canyon Nuclear Power Plant, Units 1 and 2, near San... understanding of seismic risks to the Diablo Canyon nuclear power plant. Further, that omission is not......

  7. 75 FR 11579 - Carolina Power & Light Company H. B. Robinson Steam Electric Plant, Unit No. 2; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-11

    ... environment 75 FR 8410, February 24, 2010. This exemption is effective upon issuance. Dated at Rockville... COMMISSION Carolina Power & Light Company H. B. Robinson Steam Electric Plant, Unit No. 2; Exemption 1.0 Background Carolina Power & Light Company (the licensee) is the holder of Facility Operating License No....

  8. 76 FR 66333 - Carolina Power & Light Company, H.B. Robinson Steam Electric Plant, Unit No. 2; Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-26

    ... COMMISSION Carolina Power & Light Company, H.B. Robinson Steam Electric Plant, Unit No. 2; Environmental..., ``Acceptance criteria for emergency core cooling systems for light-water nuclear power reactors,'' and 10 CFR... Facility Operating License No. DPR-23, issued to Carolina Power & Light Company (the licensee),...

  9. 75 FR 76051 - Northern States Power Company-Minnesota, Prairie Island Nuclear Generating Plant, Units 1 and 2...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-07

    ... COMMISSION Northern States Power Company--Minnesota, Prairie Island Nuclear Generating Plant, Units 1 and 2; Exemption 1.0 Background Northern States Power Company, a Minnesota corporation (NSPM, the licensee) is the..., ``Acceptance criteria for emergency core cooling systems for light-water nuclear power reactors,'' and...

  10. What would Edison do with solid state lighting?

    NASA Astrophysics Data System (ADS)

    Ferguson, Ian T.; Melton, Andrew; Xu, Tianming; Jamil, Muhammad; Fenwick, Will

    2010-08-01

    Thomas Edison is widely regarded as the greatest inventor in history and the most prominent individual behind the invention of the electric light. His impressive characteristics as an individual that led to his amazing success as an innovator continue to be an inspiration for researchers today. This paper considers how Edison might proceed in developing solid state lighting into a technology capable of displacing incumbent light sources, including his own incandescent lamps, then reviews some of the "Edison-like" contributions made to solid state lighting by the Next Generation Lighting research program at Georgia Tech.

  11. Electric vehicles in fleet operation at Detroit Edison

    SciTech Connect

    Murray, G.O.; Ostrowski, G.J.

    1982-06-01

    Detroit Edison operates a fleet of 24 electric cars in a cost-sharing demonstration program with the United States Department of Energy. The program features a unique lease program in which electric passenger cars are used by Detroit Edison employees for their personal driving needs, such as commuting to work, shopping, etc. Over 50,000 miles have been logged on the 24 cars during the first six months of operation. The project began in June, 1981. This paper describes the lease program and the Electric Car Service Center, charging stations and other facilities which Detroit Edison has set up to support the program.

  12. Permeable Pavement Monitoring at the Edison Environmental Center Demonstration Site

    EPA Science Inventory

    The presentation covers the following monitoring objectives at the demonstration site at Edison, NJ: Hydrologic performance, water quality performance, urban heat island effects, maintenance effects and infiltration water parameters. There will be a side by side monitoring of ...

  13. Green Infrastructure Research and Demonstration at the Edison Environmental Center

    EPA Science Inventory

    This presentation will review the need for storm water control practices and will present a portion of the green infrastructure research and demonstration being performed at the Edison Environmental Center.

  14. Edison Highway Bridge. Baltimore, Baltimore City, MD. Sec. 1201, MP ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Edison Highway Bridge. Baltimore, Baltimore City, MD. Sec. 1201, MP 92.02. - Northeast Railroad Corridor, Amtrak route between District of Columbia/Maryland state line & Maryland/Delaware state line, Baltimore, Independent City, MD

  15. Electric Avenue. A Utility Company's Work Experience Program Broadens Opportunities for Students.

    ERIC Educational Resources Information Center

    Ingles, Pat

    1994-01-01

    A job skills partnership between Southern California Edison Company and local high schools pairs juniors and seniors with journeyworker mentors for a year, experiencing six-week rotations in maintenance, operations, administration, warehouse, and technical occupations. (JOW)

  16. 78 FR 43198 - Watson Cogeneration Company; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-19

    ... Energy Regulatory Commission Watson Cogeneration Company; Notice of Filing Take notice that on July 12... Cogeneration Company filed an application requesting that the Commission direct (1) Southern California Edison...://www.ferc.gov , using the ``eLibrary'' link and is available for review in the Commission's...

  17. Disposal of United Nuclear Company materials at the Y-12 Plant

    SciTech Connect

    Butz, T.R.; Stoner, H.H.

    1983-12-19

    The UNC Recovery Systems Company, located at Wood River Junction, Rhode Island, was involved in the recovery of enriched uranium from scrap materials generated primarily in defense program activities of the DOE and its predecessor agencies. Following shutdown of the recovery operations in August 1980, UNC was required to decontaminate facilities and the associated waste lagoon systems and to remove the resultant low-level radioactive waste out of the state of Rhode Island. In view that the waste resulted from the processing of scrap materials generated in DOE Defense Programs activities and due to the lack of adequate capacity at commercial waste disposal facilities, DOE agreed to accept the waste for burial at the Y-12 Plant. Site characterization and well monitoring results are presented of the disposal site.

  18. Thomas Edison's Inventions in the 1900s and Today: From "New" to You! [Lesson Plan].

    ERIC Educational Resources Information Center

    2002

    The purpose of this lesson is to familiarize students with life and technology around 1900 so that they can better understand how Thomas Edison and his many inventions influenced both. Without some understanding of Edison's time, it is unclear just how significant an impact Edison had on the world, both then and now. While the incandescent light…

  19. The Fight To Save the Edison Charter in San Francisco. Briefing.

    ERIC Educational Resources Information Center

    Dphrepaulezz, Diallo

    In 1998, the San Francisco Board of Education granted a charter to Edison Schools, Inc., to manage the Edison Charter Academy. In 2001, it commenced a formal investigation of complaints that Edison had materially violated its charter and notified the school of its intent to revoke the charter. This briefing traces the events from the commencement…

  20. 75 FR 54618 - CAlifornians for Renewable Energy, Inc. (CARE) v. Pacific Gas and Electric Company, Southern...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-08

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission CAlifornians for Renewable Energy, Inc. (CARE) v. Pacific Gas and Electric Company, Southern California Edison Company, San Diego Gas & Electric Company, California Public Utilities Commission; Notice of...

  1. 75 FR 66744 - Californians for Renewable Energy, Inc. (CARE) v. Pacific Gas and Electric Company, Southern...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-29

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Californians for Renewable Energy, Inc. (CARE) v. Pacific Gas and Electric Company, Southern California Edison Company, San Diego Gas & Electric Company, California Public Utilities Commission; Notice of...

  2. 75 FR 57535 - Connecticut Yankee Atomic Power Company; Haddam Neck Plant; Notice of Issuance of Amendment To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-21

    ... Federal Register on June 14, 2010 (75 FR 33653). On September 10, 2010, the NRC approved and issued... COMMISSION Connecticut Yankee Atomic Power Company; Haddam Neck Plant; Notice of Issuance of Amendment To... application dated April 2, 2009, as supplemented March 30, 2010, Connecticut Yankee Atomic Power...

  3. 75 FR 82414 - Carolina Power & Light Company; H. B. Robinson Steam Electric Plant, Unit No. 2; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-30

    ... site security plans. The amendments to 10 CFR 73.55 published on March 27, 2009 (74 FR 13926... have a significant effect on the quality of the human environment (75 FR 80545 dated December 22, 2010... COMMISSION Carolina Power & Light Company; H. B. Robinson Steam Electric Plant, Unit No. 2; Exemption...

  4. 75 FR 44292 - Northern States Power Company; Prairie Island Nuclear Generating Plant, Units 1 and 2; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-28

    ...-AA90) published in the Federal Register on April 26, 1991 (56 FR 18997); and (C) The Nuclear Energy... contrary to the rationale for rulemaking, as discussed in 56 FR 18997. On October 26 and December 2, 2009... Power Company; Prairie Island Nuclear Generating Plant, Units 1 and 2; Notice of Issuance of...

  5. 75 FR 9620 - Southern Nuclear Operating Company, Inc.; Edwin I. Hatch Nuclear Plant, Units 1 and 2; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-03

    ... have a significant effect on the quality of the human environment (75 FR 3761; dated January 22, 2010... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Southern Nuclear Operating Company, Inc.; Edwin I. Hatch Nuclear Plant, Units 1 and 2; Exemption...

  6. 77 FR 36300 - In the Matter of Connecticut Yankee Atomic Power Company; Haddam Neck Plant; Confirmatory Order...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-18

    ... COMMISSION In the Matter of Connecticut Yankee Atomic Power Company; Haddam Neck Plant; Confirmatory Order... Safety and Safeguards, U.S. Nuclear Regulatory Commission, Washington, DC 20555. Telephone: (301) 492... and safeguards information and to special nuclear material shall be controlled by Connecticut...

  7. 75 FR 75704 - Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 And 2); Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-06

    ... From the Federal Register Online via the Government Publishing Office ] NUCLEAR REGULATORY COMMISSION Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 And 2); Notice of... Dr. Tianqing Cao, Senior Seismologist, Office of Nuclear Material Safety and Safeguards, has...

  8. Edison - A New Cray Supercomputer Advances Discovery at NERSC

    SciTech Connect

    Dosanjh, Sudip; Parkinson, Dula; Yelick, Kathy; Trebotich, David; Broughton, Jeff; Antypas, Katie; Lukic, Zarija, Borrill, Julian; Draney, Brent; Chen, Jackie

    2014-02-06

    When a supercomputing center installs a new system, users are invited to make heavy use of the computer as part of the rigorous testing. In this video, find out what top scientists have discovered using Edison, a Cray XC30 supercomputer, and how NERSC's newest supercomputer will accelerate their future research.

  9. Edison - A New Cray Supercomputer Advances Discovery at NERSC

    ScienceCinema

    Dosanjh, Sudip; Parkinson, Dula; Yelick, Kathy; Trebotich, David; Broughton, Jeff; Antypas, Katie; Lukic, Zarija, Borrill, Julian; Draney, Brent; Chen, Jackie

    2016-07-12

    When a supercomputing center installs a new system, users are invited to make heavy use of the computer as part of the rigorous testing. In this video, find out what top scientists have discovered using Edison, a Cray XC30 supercomputer, and how NERSC's newest supercomputer will accelerate their future research.

  10. The Edison Environmental Center Permeable Pavement Site - slides

    EPA Science Inventory

    This is a presentation for a second Community Outreach Event called "Chemistry Works!" at West Windsor Public Library on Saturday, November 5th. It will review the permeable pavement research project at the Edison Environmental center. Besides slide persentation, two demo units w...

  11. The Invention Factory: Thomas Edison's Laboratories. Teaching with Historic Places.

    ERIC Educational Resources Information Center

    Bolger, Benjamin

    This lesson explores the group of buildings in West Orange, New Jersey, built in 1887, that formed the core of Thomas Edison's research and development complex. They consisted of chemistry, physics, and metallurgy laboratories; machine shop; pattern shop; research library; and rooms for experiments. The lesson explains that the prototypes (ideas…

  12. Urban Watershed Research Facility at Edison Environmental Center

    EPA Science Inventory

    The Urban Watershed Research Facility (UWRF) is an isolated, 20-acre open space within EPA’s 200 acre Edison facility established to develop and evaluate the performance of stormwater management practices under controlled conditions. The facility includes greenhouses that allow ...

  13. Rodin, Patton, Edison, Wilson, Einstein: Were They Really Learning Disabled?

    ERIC Educational Resources Information Center

    Adelman, Kimberly A.; Adelman, Howard S.

    1987-01-01

    The practice of posthumously diagnosing historical figures is discussed. Emphasis is on the unsatisfactory nature of evidence found for those diagnosed as learning-disabled or dyslexic and the possibility of other explanations for identified problems. Posthumous diagnoses of Auguste Rodin, George Patton, Thomas Edison, Woodrow Wilson, and Albert…

  14. Simple Experiments on Magnetism and Electricity...from Edison.

    ERIC Educational Resources Information Center

    Schultz, Robert F.

    Background information, lists of materials needed and procedures used are provided for 16 simple experiments on electricity and magnetism. These experiments are organized into sections dealing with: (1) Edison's carbon experiments (building a galvanometer, investigating the variable conductivity of carbon, and examining the carbon transmitter…

  15. The Edison Responsive Environment Learning System, or the Talking Typewriter Developed by Thomas A. Edison Laboratory, a Subsidiary of McGraw Edison Company.

    ERIC Educational Resources Information Center

    Sanderson, Barbara A.; Kratochvil, Daniel W.

    The "Talking Typewriter" is a computerized electric typewriter with visual and audio capabilities. It was designed to create an environment where learning to read would be a successful, enjoyable experience for the student by allowing him to explore, discover relationships, to progress at his own speed, and to receive feedback. This report…

  16. 75 FR 11566 - Firstenergy Nuclear Operating Company, Firstenergy Nuclear Generation Corp., Ohio Edison Company...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-11

    ... amendment falling within the scope of section 134 of the Nuclear Waste Policy Act of 1982 (NWPA), 42 U.S.C... under 10 CFR 2.315(c), must be filed in accordance with the NRC E-Filing rule (72 FR 49139, August 28...\\ Requesters should note that the filing requirements of the NRC's E-Filing Rule (72 FR 49139; August 28,...

  17. 75 FR 67770 - General Motors Company, Formerly Known as General Motors Corporation, Orion Assembly Plant...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-03

    ... Employment and Training Administration General Motors Company, Formerly Known as General Motors Corporation... Assistance on March 17, 2010, applicable to workers of General Motors Company, formerly known as General... Register on April 23, 2010 (75 FR 21355). The notice was amended on August 25, 2010 to include...

  18. 11. Photocopy of photograph (original copy in Edison collection). Photographer ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. Photocopy of photograph (original copy in Edison collection). Photographer and date unknown, although photo taken prior to 1930 reconstruction of Project flumes. VIEW OF ORIGINAL SOUTH FORK OF THE TULE RIVER MIDDLE FORK "BOX" WOOD FLUME BRANCH SHOWING NORTH FORK OF TULE RIVER MIDDLE FORK CROSSING. VIEW TO NORTHWEST. - Tule River Hydroelectric Project, Water Conveyance System, Middle Fork Tule River, Springville, Tulare County, CA

  19. NASA Facts: Edison Demonstration of Spacecraft Networks (EDSN) Mission

    NASA Technical Reports Server (NTRS)

    Ord, Stephen; Yost, Bruce D.; Petro, Andrew J.

    2013-01-01

    NASA's Edison Demonstration of Smallsat Networks (EDSN) mission will launch and deploy a swarm of 8 cubesats into a loose formation approximately 500 km above Earth. EDSN will develop technology to send multiple, advanced, yet affordable nanosatellites into space with cross-link communications to enable a wide array of scientific, commercial, and academic research. Other goals of the mission include lowering the cost and shortening the development time for future small spacecraft.

  20. Southern California Edison bets on energy alternatives

    NASA Astrophysics Data System (ADS)

    Riley, W. B.

    1981-08-01

    A 10-MW solar-thermal generating plant and a 100-MW integrated coal-gasification combined cycle (IGCC) power facility are being built to develop a wide range of renewable, alternative power sources by 1990. The solar-thermal generating plant will use steam at 500 C and 100 kg/sq cm to produce 10 MW of electricity. It consists of a 1818 heliostat array, each weighing 1155 kg and having 12 mirrors which are rotated at either 0.25 deg/min (for sun following) or 22.5 deg/min (for major focusing and defocusing). A master control system allows both fully automatic and manual operation, and a beam-characterization system permits the operator to check the alignment of each heliostat individually. A central receiver, consisting of 24 panels of tubing, produces steam at 500 C and 100 kg/sq cm. The thermal storage unit uses crushed granite to absorb 50 kWht/cu m, allowing the plant to operate after sundown. The IGCC plant integrates the coal-gasification plant and the combined-cycle unit, demonstrating operational flexibility and reliability, load-following capability, and compliance with environmental regulations. The gasifier produces 79,300 cu m/h of a mixture of 51% CO and 36% H at 1370 C,and the gas turbine regenerates 65 MW through its own generator.

  1. 75 FR 43563 - Dow Jones & Company, Sharon Pennsylvania Print Plant a Subsidiary of News Corporation, West...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-26

    ... June 7, 2010 (75 FR 32224). The workers are engaged in the production of print publications. Pursuant... film came from a company currently approved for TRA, Konica'' and that those plates and film...

  2. 76 FR 77022 - In the Matter of Carolina Power & Light Company, H.B. Robinson Steam Electric Plant, Unit No. 2...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-09

    ... COMMISSION [NRC-2011-0282; License Nos. DPR-23 and SNM-2502; Docket Nos. 50-261 and 72-3] In the Matter of Carolina Power & Light Company, H.B. Robinson Steam Electric Plant, Unit No. 2, H. B. Robinson Steam... Control of Licenses I. Carolina Power & Light Company (CP&L, the licensee) is the owner of the...

  3. Southern Company Services' study of a Kellogg Rust Westinghouse (KRW)-based gasification-combined-cycle (GCC) power plant

    SciTech Connect

    Gallaspy, D.T.; Johnson, T.W.; Sears, R.E. )

    1990-07-01

    A site-specific evaluation of an integrated-gasification-combined- cycle (IGCC) unit was conducted by Southern Company Services, Inc. (SCS) to determine the effect of such a plant would have on electricity cost, load response, and fuel flexibility on the Southern electric system (SES). The design of the Plant Wansley IGCC plant in this study was configured to utilize three oxygen-blown Kellogg Rust Westinghouse (KRW) gasifiers integrated with two General Electric (GE) MS7001F combustion turbines. The nominal 400-MW IGCC plant was based on a nonphased construction schedule, with an operational start date in the year 2007. Illinois No. 6 bituminous coal was the base coal used in the study. Alabama lignite was also investigated as a potential low-cost feedstock for the IGCC plant, but was found to be higher in cost that the Illinois No. 6 coal when shipped to the Wansley site. The performance and cost results for the nominal 400-MW plant were used in an economic assessment that compared the replacement of a 777-MW pulverized-coal-fired unit with 777-MW of IGCC capacity based on the Southern electric system's expansion plans of installing 777-MW of baseload capacity in the year 2007. The economic analysis indicated that the IGCC plant was competitive compared to a baseload pulverized-coal-fired unit. Capital costs of the IGCC unit were approximately the same as a comparably sized pulverized-coal-fired plant, but the IGCC plant had a lower production cost due to its lower heat rate. 10 refs., 34 figs., 18 tabs.

  4. 75 FR 8753 - Carolina Power & Light Company, Brunswick Steam Electric Plant, Units 1 and 2; Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-25

    ... part 73 as discussed in a Federal Register notice dated March 27, 2009 (74 FR 13967). There will be no... Requirements, 74 FR 13926, 13967 (March 27, 2009)). The licensee currently maintains a security system..., issued to Carolina Power & Light Company (CP&L, the licensee), for operation of the Brunswick...

  5. Assistance and Accountability in Externally Managed Schools: The Case of Edison Schools, Inc.

    ERIC Educational Resources Information Center

    Marsh, Julie; Hamilton, Laura; Gill, Brian

    2008-01-01

    Edison Schools, Inc., is the largest and most visible among a growing number of Education Management Organizations that have entered into contracts to manage public schools, including both conventional and charter schools. Edison's approach to managing schools is comprehensive, and it distinguishes itself from most other school improvement…

  6. Electrical Connections: Letters to Thomas Edison in Response to His Claim of Solving Incandescent Lighting, 1878.

    ERIC Educational Resources Information Center

    Bazerman, Charles

    1994-01-01

    Discusses the way in which letters sent to Thomas Edison following the report that he had solved the problem of incandescent lighting reveal the many discursive worlds that Edison's work touched. Claims these letters indicate how a technological accomplishment is also a multiple, complex social, and communicative accomplishment, creating place and…

  7. 76 FR 30739 - Notice of Availability of the Record of Decision for Southern California Edison's Eldorado...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-26

    ... Bureau of Land Management Notice of Availability of the Record of Decision for Southern California Edison... hours. SUPPLEMENTARY INFORMATION: Southern California Edison (SCE) filed an application under Title V of..., subpart E) for further requirements. Authority: 40 CFR 1506.6. Thomas Pogacnik, Deputy State...

  8. [Plant genetic engineering in Monsanto company: from the first laboratory experiments to worldwide practical use].

    PubMed

    Konov, A L; Velchev, M; Parcel, D

    2005-01-01

    The history of modern biotechnology of agricultural plants is briefly considered in the article. Methods of genetic transformation and regeneration of transgenic plants as well as the mechanisms of resistance of genetically modified plants to herbicides and pests are discussed. By the example of genetically modified varieties and hybrids there are shown the ways of solving the problem of weeds and pests. The questions of biosafety legislation in different countries are considered.

  9. Photovoltaic Power Plants

    NASA Astrophysics Data System (ADS)

    Berman, Elliot

    1986-11-01

    To demonstrate technical viability of photovoltaic modules in central, grid connected energy systems, ARCO Solar, Inc. has designed, installed and is operating two photovoltaic power plants on the megawatt scale. These systems use two-axis tracking. The first generation plant in Lugo (Hesperia), California, with a nominal rating of one MWpk (DC)" was installed in 1982 in the Southern California Edison Company grid. The second system, rated at 6.4 MWDk (DC), is located in the Carrisa Plain in California and connected to the Pacific Gas and Electric Company grid. Based on the cost and performance data from these installations, an assessment of the current status and future needs of large scale photovoltaic energy systems is made. With each new system, improved techniques of design, installation and system integration have been developed. Expectations have been confirmed as to the performance and adaptability of solar cells, especially the ease of incremental increases in capacity when needed. Modular photovoltaic systems have been found to be easy to build and operate, and to be highly reliable. Prologue: Technological advancement usually requires good science and logical engineering. In the main, faith, persistence and feel are also required. Rule: The balance-of-system costs for photovoltaic energy systems equal photovoltaic module costs. Photovoltaic systems have progressed to their current stage of high promise because of faith, persistence, feel and belief in this rule.

  10. Superfund record of decision (EPA Region 3), Westinghouse Elevator Company Plant, Operable Unit 2, Cumberland Township, Adams County, Gettysburg, PA, March 31, 1995

    SciTech Connect

    1995-04-01

    This Record of Decision (ROD) presents the selected remedial action for Operable Unit 2 (Soils) at the Westinghouse Elevator Company Plant Site in Adams County, Pennsylvania. The selected remedy for the soils at the Westinghouse Elevator Plant is No Additional Action for this Operable Unit. The other alternatives evaluated would produce little or no environmental benefit at substantial cost.

  11. Success Continues: NASA-Developed Plant Health Measurement Technology is Becoming Big Business for Illinois Company

    NASA Technical Reports Server (NTRS)

    2003-01-01

    Originally produced in 2001, sales of Spectrum Technologies' CM 1000 chlorophyll meter have now topped $290,000 on 140 units. Up-to-date sales figures for 2003 have shown an almost 50% increase over the combined sales totals of 2001 and 2002. The CM 1000 chlorophyll meter identifies the failing health of a plant based on the chlorophyll content of the plant up to 16 days before it is physically detectable by the human eye. Poor health, 'stress' in a plant, is a result of unfavorable growing conditions; lack of nutrients, insufficient water, disease or insect damage.

  12. Exploring Distributed Energy Alternatives to Electrical Distribution Grid Expansion in Souhern California Edison Service Territory

    SciTech Connect

    Stovall, Therese K; Kingston, Tim

    2005-12-01

    Distributed energy (DE) technologies have received much attention for the energy savings and electric power reliability assurances that may be achieved by their widespread adoption. Fueling the attention have been the desires to globally reduce greenhouse gas emissions and concern about easing power transmission and distribution system capacity limitations and congestion. However, these benefits may come at a cost to the electric utility companies in terms of lost revenue and concerns with interconnection on the distribution system. This study assesses the costs and benefits of DE to both consumers and distribution utilities and expands upon a precursory study done with Detroit Edison (DTE)1, by evaluating the combined impact of DE, energy-efficiency, photovoltaics (a use of solar energy), and demand response that will shape the grid of the future. This study was funded by the U.S. Department of Energy (DOE), Gas Research Institute (GRI), American Electric Power (AEP), and Gas Technology Institute's (GTI) Distributed Energy Collaborative Program (DECP). It focuses on two real Southern California Edison (SCE) circuits, a 13 MW suburban circuit fictitiously named Justice on the Lincoln substation, and an 8 MW rural circuit fictitiously named Prosper on the Washington Substation. The primary objectives of the study were threefold: (1) Evaluate the potential for using advanced energy technologies, including DE, energy-efficiency (EE), demand response, electricity storage, and photovoltaics (PV), to reshape electric load curves by reducing peak demand, for real circuits. (2) Investigate the potential impact on guiding technology deployment and managing operation in a way that benefits both utilities and their customers by: (a) Improving grid load factor for utilities; (b) Reducing energy costs for customers; and (c) Optimizing electric demand growth. (3) Demonstrate benefits by reporting on a recently installed advanced energy system at a utility customer site. This

  13. Edison and the pure science ideal in 19th-century america.

    PubMed

    Hounshell, D A

    1980-02-01

    Between 1878 and 1882, key members of the American scientific community played an important role in Thomas A. Edison's work on electric lighting. Impressed by his abilities, these scientists came to regard Edison as a peer and led him to see himself as a scientific man. But Edison's high standing among scientists and the American public and his professed self-image as a scientist provoked America's noted experimental physicist, Henry A. Rowland, to make a "Plea for pure science" before the American Association for the Advancement of Science in 1883.

  14. Edison and the pure science ideal in 19th-century america.

    PubMed

    Hounshell, D A

    1980-02-01

    Between 1878 and 1882, key members of the American scientific community played an important role in Thomas A. Edison's work on electric lighting. Impressed by his abilities, these scientists came to regard Edison as a peer and led him to see himself as a scientific man. But Edison's high standing among scientists and the American public and his professed self-image as a scientist provoked America's noted experimental physicist, Henry A. Rowland, to make a "Plea for pure science" before the American Association for the Advancement of Science in 1883. PMID:17749314

  15. 75 FR 73135 - Southern Nuclear Operating Company, Inc. Joseph M. Farley Nuclear Plant, Environmental Assessment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-29

    ... licensee), for operation of the Joseph M. Farley Nuclear Plant, Units 1 and 2 (FNP), located in Houston... the FNP from the required implementation date of March 31, 2010, for several new requirements of 10 CFR Part 73. Specifically, FNP would be granted an exemption from being in full compliance...

  16. 75 FR 54388 - General Motors Company Formerly Known as General Motors Corporation, Orion Assembly Plant...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-07

    ... Orion, Michigan. The notice was published in the Federal Register on April 23, 2010 (75 FR 21355). At..., Orion Assembly Plant Including On-Site Leased Workers From Aerotek Automotive Lake Orion, MI; Amended... leased from Aerotek Automotive were employed on-site at the Lake Orion, Michigan location of...

  17. 75 FR 76038 - General Motors Company Formerly Known as General Motors Corporation Willow Run Transmission Plant...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-07

    ... Register on July 26, 2010 (75 FR 43558). The notice was amended on July 30, 2010 to include on-site leased workers from Aerotek. The notice was published in the Federal Register on August 13, 2010 (75 FR 49527... Willow Run Transmission Plant Including On-Site Leased Workers From Aerotek, Securitas, Knight...

  18. Southern California Edison High Penetration Photovoltaic Project - Year 1

    SciTech Connect

    Mather, B.; Kroposki, B.; Neal, R.; Katiraei, F.; Yazdani, A.; Aguero, J. R.; Hoff, T. E.; Norris, B. L.; Parkins, A.; Seguin, R.; Schauder, C.

    2011-06-01

    This report discusses research efforts from the first year of a project analyzing the impacts of high penetration levels of photovoltaic (PV) resources interconnected onto Southern California Edison's (SCE's) distribution system. SCE will be interconnecting a total of 500 MW of commercial scale PV within their service territory by 2015. This Year 1 report describes the need for investigating high-penetration PV scenarios on the SCE distribution system; discusses the necessary PV system modeling and distribution system simulation advances; describes the available distribution circuit data for the two distribution circuits identified in the study; and discusses the additional inverter functionality that could be implemented in order to specifically mitigate some of the undesirable distribution system impacts caused by high-penetration PV installations.

  19. Update to permeable pavement research at the Edison Environmental Center - slides

    EPA Science Inventory

    Abstract: The EPA’s Urban Watershed Management Branch (UWMB) has been monitoring the permeable pavement demonstration site at the Edison Environmental Center, NJ since 2010. This site has three different types of permeable pavement including: interlocking concrete permeable...

  20. Update to Permeable Pavement Research at the Edison Environmental Center - abstract

    EPA Science Inventory

    Abstract The EPA’s Urban Watershed Management Branch (UWMB) has been monitoring the permeable pavement demonstration site at the Edison Environmental Center, NJ since 2010. This site has three different types of permeable pavement including: interlocking concrete permeable ...

  1. Update to Permeable Pavement Research at the Edison Environmental Center - abstract

    EPA Science Inventory

    Abstract The EPA’s Urban Watershed Management Branch (UWMB) has been monitoring the permeable pavement demonstration site at the Edison Environmental Center, NJ since 2010. This site has three different types of permeable pavement including: interlocking concrete permeable pavers...

  2. Update to permeable pavement research at the Edison Environmental Center - slides

    EPA Science Inventory

    Abstract: The EPA’s Urban Watershed Management Branch (UWMB) has been monitoring the permeable pavement demonstration site at the Edison Environmental Center, NJ since 2010. This site has three different types of permeable pavement including: interlocking concrete permeable paver...

  3. Monitoring of the Permeable Pavement Demonstration Site at the Edison Environmental Center (Poster)

    EPA Science Inventory

    This is a poster on the permeable pavement parking lot at the Edison Environmental Center. The monitoring scheme for the project is discussed in-depth with graphics explaining the instrumentation installed at the site.

  4. Rohm and Haas: Company Uses Knoxville Plant Assessment Results to Develop Best Practices Guidelines and Benchmark for Its Other Sites (Revised)

    SciTech Connect

    Not Available

    2003-07-01

    Rohm and Haas conducted a plant-wide energy assessment at its Knoxville, Tennessee, chemicals manufacturing facility. The assessment identified potential annual energy savings of nearly 47,000 MMBtu in steam and fuel and 11,000 MWh in electricity. Annual cost savings were estimated at almost$1.5 million. After the assessment was replicated in California and Kentucky plants, the companys additional estimated cost savings were$500,000 annually. Additional annual energy savings were about 23,000 MMBtu and 6,000 MWh. The assessments also indicated the plants would reduce nitrous oxide emissions.

  5. 75 FR 12580 - Southern California Edison Company, San Onofre Nuclear Generating Station, Units 2 and 3...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-16

    ...; Environmental Assessment and Finding of No Significant Impact The U.S. Nuclear Regulatory Commission (NRC) is.... In accordance with 10 CFR 51.21, the NRC prepared an environmental assessment documenting its finding. The NRC concluded that the proposed actions will have no significant environmental...

  6. 77 FR 65909 - Southern California Edison Company; Establishment of Atomic Safety and Licensing Board

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-31

    ... delegation by the Commission, see 37 FR 28,710 (Dec. 29, 1972), and the Commission's regulations, see 10 CFR... hearing published in the Federal Register on August 16, 2012 (77 FR 49,463), a hearing request was... promulgated in August 2007 (72 FR 49,139). Issued at Rockville, Maryland, this 25th day of October 2012....

  7. 76 FR 6836 - Southern California Edison Company; Notice of Withdrawal of Application for Amendments to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-08

    ... (SONGS), Units 2 and 3, respectively, located in San Diego County, California. The proposed amendments... Notice of Consideration of Issuance of Amendment published in the Federal Register on May 18, 2010 (75...

  8. Status of the Southern California Edison Company 3 MW Wind Turbine Generator (WTG) demonstration project

    NASA Technical Reports Server (NTRS)

    Scheffler, R. L.

    1979-01-01

    To demonstrate the concept of utility scale electricity production from a high wind energy resource, a program was initiated to construct and test a 3 megawatt (3,000 kW) Schachle wind turbine generator near Palm Springs, California. The background and current status of this program are presented along with a summary of future planned program activities.

  9. 75 FR 70707 - Detroit Edison Company; Environmental Assessment and Finding of No Significant Impact

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-18

    ... in Monroe County, Michigan. Therefore, as required by 10 CFR 51.21, the NRC performed an... changes to land use or water use, or result in changes to the quality or quantity of non- radiological... State official, Mr. Ken Yale, of the Michigan Department of Natural Resources and Environment...

  10. Lead abatement system cuts corners, costs for utility company

    SciTech Connect

    Fuller, B.

    1996-11-01

    When Consolidated Edison Co. (New York) called for bids to remove lead from the 125-foot-tall steam-dispersion stacks at its Astoria Power Generating Station, the company specified that no lead could be released into the environment during the project. Another restriction was that any abrasive blasting for surface preparation would have to be accompanied by full-scale containment--including use of airtight seals, ventilation systems, entrance and exit air locks, and impermeable containment material--to ensure minimal discharge to the generating plant below the stack. Prospective contractors also would be required to meet Occupational Safety and Health Administration standards for medical surveillance, hygiene facilities, eating areas and personal protective equipment if lead levels exceeded 30 micrograms per cubic meter. To reduce the cost of erecting and maintaining full containment without jeopardizing health and safety criteria, Con Ed incorporated a practical solution to remove its aging, lead-based paint. The technology, comprised of a Vac-Pac{reg_sign} self-drumming HEPA filtration system, supports up to 10 operators using proprietary scalers and needleguns. The scalers are effective for flat areas, removing coatings at 45 square feet per hour, while the needleguns are designed for use on corners, edges, rivets and bolts.

  11. Report on Preliminary Engineering Study for Installation of an Air Cooled Steam Condenser at Brawley Geothermal Plant, Unit No. 1

    SciTech Connect

    1982-03-01

    The Brawley Geothermal Project comprises a single 10 MW nominal geothermal steam turbine-generator unit which has been constructed and operated by the Southern California Edison Company (SCE). Geothermal steam for the unit is supplied through contract by Union Oil Company which requires the return of all condensate. Irrigation District (IID) purchases the electric power generated and provides irrigation water for cooling tower make-up to the plant for the first-five years of operation, commencing mid-1980. Because of the unavailability of irrigation water from IID in the future, SCE is investigating the application and installation of air cooled heat exchangers in conjunction with the existing wet (evaporative) cooling tower with make-up based on use of 180 gpm (nominal) of the geothermal condensate which may be made available by the steam supplier.

  12. THE DEVELOPMENT OF A BEGINNING READING SKILLS PROGRAM USING THE EDISON RESPONSIVE ENVIRONMENTS INSTRUMENT. SECOND PROGRESS REPORT.

    ERIC Educational Resources Information Center

    GOTKIN, LASSAR G.; MCSWEENEY, JOSEPH

    THE SECOND PROGRESS REPORT OF A PROJECT UTILIZING A COMPLEX TEACHING MACHINE, THE EDISON RESPONSIVE ENVIRONMENT INSTRUMENT, TO STUDY THE ACQUISITION OF BEGINNING READING SKILLS BY 5-YEAR-OLDS FROM DISADVANTAGED BACKGROUNDS IS PRESENTED. THE FIRST REPORT DESCRIBED THE EDISON RESPONSIVE ENVIRONMENT INSTRUMENT AND DISCUSSED THE PROGRAMING DEVELOPED…

  13. Reliability analysis of a utility-scale solar power plant

    NASA Astrophysics Data System (ADS)

    Kolb, G. J.

    1992-10-01

    This paper presents the results of a reliability analysis for a solar central receiver power plant that employs a salt-in-tube receiver. Because reliability data for a number of critical plant components have only recently been collected, this is the first time a credible analysis can be performed. This type of power plant will be built by a consortium of western US utilities led by the Southern California Edison Company. The 10 MW plant is known as Solar Two and is scheduled to be on-line in 1994. It is a prototype which should lead to the construction of 100 MW commercial-scale plants by the year 2000. The availability calculation was performed with the UNIRAM computer code. The analysis predicted a forced outage rate of 5.4 percent and an overall plant availability, including scheduled outages, of 91 percent. The code also identified the most important contributors to plant unavailability. Control system failures were identified as the most important cause of forced outages. Receiver problems were rated second with turbine outages third. The overall plant availability of 91 percent exceeds the goal identified by the US utility study. This paper discuses the availability calculation and presents evidence why the 91 percent availability is a credible estimate.

  14. Do not disturb the animals! or, how Con Edison saved $300,000 using a trenchless technology to renew 3,000 feet of leaking gas main at the Bronx Zoo

    SciTech Connect

    Bufe, M.

    1995-07-01

    Every leaking gas main presents a challenge. But when that leaking main follows a series of sweeping bends on its route through North America`s largest urban wildlife park, it presents a special challenge. That was the situation Consolidated Edison Company of New York Inc. recently faced when numerous leaks were discovered along 3,000 feet of a 95-year-old, 12-inch cast-iron main that winds through New York City`s Bronx Zoo. Con Edison knew it needed a long-term solution to this increasingly common problem. Thanks to the cooperative efforts of the utility`s operations and research departments and the Gas Research Institute (GRI), Con Edison also knew about a trenchless technology that could renew the pipe with minimal impact to the environment--while saving the utility a substantial sum of money in the process. In the Paltem system, a woven polyester hose is injected with an epoxy resin and then inverted (turned inside out) into a pipe at an access pit. The liner then bonds to the inside wall of the pipe, forming a smooth, flexible and pressure-resistant lining. The process is environmentally safe, requires very little excavation and can be installed in days, rather than the weeks or months it can take to dig up and replace existing pipe.

  15. Thermal Modeling and Testing of the Edison Demonstration of Smallsat Networks Project

    NASA Technical Reports Server (NTRS)

    Coker, Robert

    2014-01-01

    NASA's Edison program is intending to launch the Edison Demonstration of Smallsat Networks (EDSN) project, a swarm of 8 1.5U cubesats in the fall of 2014 to demonstrate intra-swarm communications and multi-point in situ space physics data acquisition. Due to late changes in the duty cycles of various components, potential overheating issues appeared. In addition, it was determined that capacity loss due to the coldness of the batteries was unacceptable, so mitigation was required. This paper will discuss the thermal modeling, testing, and results of the EDSN mission.

  16. 47 CFR 36.352 - Other property plant and equipment expenses-Account 6510 (Class B telephone companies); Accounts...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 2 2011-10-01 2011-10-01 false Other property plant and equipment expenses... Plant Expenses-Other § 36.352 Other property plant and equipment expenses—Account 6510 (Class B... based on the separation of Account 2001—Telecommunications Plant in Service. Network Operations Expenses...

  17. Permeable Pavement Monitoring at the Edison Environmental Center Demonstration Site - presentation

    EPA Science Inventory

    The EPA’s Urban Watershed Management Branch has been monitoring an instrumented 110-space pervious pavement parking lot. The lot is used by EPA personnel and visitors to the Edison Environmental Center. The design includes 28-space rows of three permeable pavement types: asphal...

  18. Confluence Is a Cure: A Reply to "Edison Is the Symptom, NCLB Is the Disease"

    ERIC Educational Resources Information Center

    Chubb, John

    2007-01-01

    This article presents a reply to "Edison Is the Symptom, NCLB Is the Disease" by Peter Campbell--a critique that portrayed the school as an exploitative environment, a veritable plantation subjugating poor minority children through mind-numbing, compliance-inducing drills. The author refutes the specific charges leveled against Confluence and the…

  19. Permeable Pavement Monitoring at the Edison Environmental Center Demonstration Site - Abstract

    EPA Science Inventory

    The EPA’s Urban Watershed Management Branch (UWMB) is monitoring an instrumented, working, 110-space pervious pavement parking at EPA’s Edison Environmental Center (EEC). Permeable pavement systems are classified as stormwater best management practices (BMPs) which reduce runo...

  20. EPA’s permeable pavement research and the Edison Environmental Center

    EPA Science Inventory

    A deteriorated parking area on EPA’s Edison Environmental Center needed replacement. The replacement offered an opportunity for the facility managers to reduce the impervious footprint and the reduce stormwater runoff volume. This also provided researchers from the National Risk ...

  1. 76 FR 28025 - Edison Mission Holding Beach, LLC; Notice of Petition for Declaratory Order

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-13

    ... Energy Regulatory Commission Edison Mission Holding Beach, LLC; Notice of Petition for Declaratory Order... Mission Holding Beach, LLC (EMHB) filed a petition for declaratory order requesting that the Federal...), that it will acquire from, and then lease back to their current owner, AES Huntington Beach, LLC....

  2. A Principal's Story. Two-Year Effort To Turn around Edison Elementary School in San Francisco.

    ERIC Educational Resources Information Center

    Romines, Ken

    In this memoir, a principal recounts the story of his 2 years at Edison Elementary School in San Francisco (CA), a school that was called the worst school in California. The students had the worst standardized test scores in the district, and racial discord and playground violence were common. The school was facing the threat of reconstitution,…

  3. Rainwater collection and management from roofs at the Edison Environmental Center

    EPA Science Inventory

    In the past, the EPA’s Edison Environmental Center, a 200 acre federal run facility, directed all rainwater from roofed areas to the existing stormwater conveyance system. Over the last several years, modifications have been made to the practice of discharging stormwater to the e...

  4. The Con Edison Emergency Child Care Plan for Management Employees: Summary Plan Description.

    ERIC Educational Resources Information Center

    Consolidated Edison Co., Brooklyn, NY.

    This summary plan description offers guidelines for participation in a pilot program that provides short-term emergency care for children of Con Edison managers who are under 13 years old. The plan offers professional, in-home child care that can be used when usual arrangements have collapsed. The summary plan description addresses the following…

  5. Edison Electric, Exxon Push Nuclear Power in Nation's Classrooms

    ERIC Educational Resources Information Center

    Feldman, Dede

    1978-01-01

    Pro-nuclear power "educational materials" designed or promoted by energy and utility companies lack objectivity about alternative energy resources. A free comic book distributed to public schools in New Mexico and a simulation game supplied to Maryland public schools at the expense of utility customers are described. (SW)

  6. 75 FR 3761 - Southern Nuclear Operating Company, Inc., Edwin I. Hatch Nuclear Plant, Units 1 and 2...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-22

    ... part 73, does not involve any physical changes to the reactor, fuel, plant structures, support... FR 13967). There will be no change to radioactive effluents that affect radiation exposures to plant... part 73, ``Physical protection of plants and materials,'' for Renewed Facility Operating License...

  7. 47 CFR 36.352 - Other property plant and equipment expenses-Account 6510 (Class B telephone companies); Accounts...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Other property plant and equipment expenses... Section 36.352 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES... Plant Expenses-Other § 36.352 Other property plant and equipment expenses—Account 6510 (Class...

  8. 47 CFR 36.352 - Other property plant and equipment expenses-Account 6510 (Class B telephone companies); Accounts...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 2 2013-10-01 2013-10-01 false Other property plant and equipment expenses... Section 36.352 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES... Plant Expenses-Other § 36.352 Other property plant and equipment expenses—Account 6510 (Class...

  9. 47 CFR 36.352 - Other property plant and equipment expenses-Account 6510 (Class B telephone companies); Accounts...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 2 2014-10-01 2014-10-01 false Other property plant and equipment expenses... Section 36.352 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES... Plant Expenses-Other § 36.352 Other property plant and equipment expenses—Account 6510 (Class...

  10. 47 CFR 36.352 - Other property plant and equipment expenses-Account 6510 (Class B telephone companies); Accounts...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 2 2012-10-01 2012-10-01 false Other property plant and equipment expenses... Section 36.352 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES... Plant Expenses-Other § 36.352 Other property plant and equipment expenses—Account 6510 (Class...

  11. Determination of compliance with PL 92-500 Section 316(b) for the Donald C. Cook Nuclear Power Plant of the Indiana and Michigan Power Company

    SciTech Connect

    Sharma, R K; Freeman, III, R F

    1980-04-01

    Region III of the US Fish and Wildlife Service contracted with the Division of Environmental Impact Studies, Argonne National Laboratory, to make the 316(b) determination for the Donald C. Cook Nuclear Power Plant of the Indiana and Michigan Power Company and to make recommendations for improvement in intake design to facilitate compliance. To conduct this assessment, appropriate literature on screening systems and reports furnished by the applicant on intake design and operation and on ecological studies at the site were reviewed. Modifications of the location and design of the existing intake and possibilities of retrofitting with fine-mesh screening to screen larval forms of fishes were examined. It was determined that currently there is no dictated need for fine-mesh screening of intake flow at the D.C. Cook Nuclear Power Plant.

  12. DTE Energy Technologies With Detroit Edison Co. and Kinectrics Inc.: Distributed Resources Aggregation Modeling and Field Configuration Testing

    SciTech Connect

    Not Available

    2003-10-01

    Summarizes the work of DTE Energy Technologies, Detroit Edison, and Kinectrics, under contract to DOE's Distribution and Interconnection R&D, to develop distributed resources aggregation modeling and field configuration testing.

  13. Human Resource Development and New Technology in the Automobile Industry: A Case Study of Ford Motor Company's Dearborn Engine Plant. The Development and Utilization of Human Resources in the Context of Technological Change and Industrial Restructuring.

    ERIC Educational Resources Information Center

    Chen, Kan; And Others

    This report centers around a plant-level study of the development and utilization of human resources in the context of technological change and industrial restructuring in the crankshaft production area of Ford Motor Company's Dearborn Engine Plant (DEP). The introductory chapter describes how the study was conducted, provides an introduction to…

  14. North Star Steel Company: Iowa Mini-Mill Conducts Plant-Wide Energy Assessment Using a Total Assessment Audit

    SciTech Connect

    2004-08-01

    North Star Steel completed a plant-wide energy assessment at its plant in Wilton, Iowa. The assessment identified potential annual savings of 140,000 MMBtu in natural gas, nearly 39 million kWh in electricity, and more than $2.6 million.

  15. Thermal Modeling in Support of the Edison Demonstration of Smallsat Networks Project

    NASA Technical Reports Server (NTRS)

    Coker, Robert

    2013-01-01

    NASA's Edison program is intending to launch a swarm of at least 8 small satellites in 2013. This swarm of 1.5U Cubesats, the Edison Demonstration of Smallsat Networks (EDSN) project, will demonstrate intra-swarm communications and multi-point in-situ space physics data acquisition. In support of the design and testing of the EDSN satellites, a geometrically accurate thermal model has been constructed. Due to the low duty cycle of most components, no significant overheating issues were found. The predicted mininum temperatures of the external antennas are low enough, however, that some mitigation may be in order. The development and application of the model will be discussed in detail.

  16. Nuclear criticality safety assessment of the Consolidated Edison Uranium-Solidification Program Facility

    SciTech Connect

    Thomas, J.T.

    1984-01-01

    A nuclear criticality assessment of the Consolidated Edison Uranium-Solidification Program facility confirms that all operations involved in the process may be conducted with an acceptable margin of subcriticality. Normal operation presents no concern since subcriticality is maintained by design. Several recommendations are presented to prevent, or mitigate the consequences of, any abnormal events that might occur in the various portions of the process. These measures would also serve to reduce to a minimum the administrative controls required to prevent criticality.

  17. Inferred relation of Miocene Bealville Fanglomerate to Edison Fault, Caliente Canyon area, Kern County, California

    SciTech Connect

    Dibblee, T.W. Jr.; Warne, A.H.

    1986-04-01

    The Bealville Fanglomerate is a very coarse, local, eastern torrential facies of the middle Tertiary marine sedimentary sequence of southern San Joaquin basin. This fanglomerate is exposed in lower Caliente Canyon east of Bakersfield. It is composed of unsorted boulder-size detritus of granitic rocks now exposed in the highlands on the east and south. The fanglomerate intertongues northwestward into the overlying Miocene fluvial Bena Gravel and probably partly into the underlying Oligocene-Miocene fluvial Walker Formation. In its eastern exposure, the Bealville Fanglomerate laps onto granitic basement. The Bealville Fanglomerate, as thick as 7000 ft (2200 m), dips southward into the north-dipping Edison fault. Pre-Tertiary granitic basement was elevated on the Edison fault to the south when the fault was contemporaneously active during the Miocene. Both the fanglomerate terrane north of the fault and the adjacent granitic basement terrane south of it are now eroded to low relief, so the fault is not expressed physiographically and is inactive. In contrast, the active White Wolf fault to the southeast is expressed by the northwest-facing escarpment slope of Bear Mountain. The Bealville Fanglomerate was deposited during the early and middle Miocene as coarse alluvial detritus on the western base of the rising Sierra Nevada uplift of granitic terrane. This southward-dipping fanglomerate is coarser and thicker than other formations deposited on the eastern margin of the San Joaquin basin. These conditions indicate that the fanglomerate was deposited rapidly on a southward-tilting block against a block of granitic basement being elevated on the Edison fault to the south, and it was derived from the adjacent granitic terrane to the east and from that elevated on the Edison fault to the south.

  18. Final report on the power production phase of the 10 MW/sub e/ Solar Thermal Central Receiver Pilot Plant

    SciTech Connect

    Radosevich, L.G.

    1988-03-01

    This report describes the evaluations of the power production testing of Solar One, the 10 MW/sub e/ Solar Thermal Central Receiver Pilot Plant near Barstow, California. The Pilot Plant, a cooperative project of the US Department of Energy and utility firms led by the Southern California Edison Company, began a three year period of power production operation in August 1984. During this period, plant performance indicators, such as capacity factor, system efficiency, and availability, were studied to assess the operational capability of the Pilot Plant to reliably supply electrical power. Also studied was the long-term performance of such key plant components as the heliostats and the receiver. During the three years of power production, the Pilot Plant showed an improvement in performance. Considerable increases in capacity factor, system efficiency, and availability were achieved. Heliostat operation was reliable, and only small amounts of mirror corrosion were observed. Receiver tube leaks did occur, however, and were the main cause of the plant's unscheduled outages. The Pilot Plant provided valuable lessons which will aid in the design of future solar central receiver plants. 53 refs., 46 figs., 4 tabs.

  19. Smart Companies.

    ERIC Educational Resources Information Center

    Galagan, Patricia A.

    1997-01-01

    Capturing and leveraging knowledge is an important new management trend that is as yet undefined. Some companies are accounting for their intellectual capital and applying it to the company balance sheets. (JOW)

  20. The Urban Watershed Research Facility, Edison, New Jersey

    EPA Science Inventory

    In an undeveloped and undisturbed environment, rainfall is naturally filtered and absorbed by soil and plants, protecting aquatic systems by slowly releasing the water to ground water and streams. In an urban setting with development and lots of impervious surfaces, natural prote...

  1. 76 FR 11521 - Prairie Island Nuclear Generating Plant, Unit 1, Northern States Power Company-Minnesota; Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-02

    ... (76 FR 9827), which informed the public that the Nuclear Regulatory Commission was considering the... CONTACT: Thomas J. Wengert, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission..., Plant Licensing Branch III-1, Division of Operating Reactor Licensing, Office of Nuclear...

  2. 75 FR 76052 - Southern Nuclear Operating Company, Inc. Joseph M. Farley Nuclear Plant, Units 1 and 2; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-07

    ... environment (75 FR 73135, dated November 29, 2010). This exemption is effective upon issuance. Dated at.... Farley Nuclear Plant, Units 1 and 2 (FNP). The licenses provide, among other things, that the facility is... consistent with the approach set forth by the Commission as discussed in the June 4, 2009, letter....

  3. 78 FR 28245 - In the Matter of Southern Nuclear Operating Company, Farley Nuclear Plant, Units 1 and 2...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-14

    ... FR 49139; August 28, 2007). The E-Filing process requires participants to submit and serve all... Nuclear Plant (FNP), Units 1 and 2, in accordance with conditions specified therein. The facility is... investigation, the NRC issued a letter to FNP dated January 9, 2013, which documented an apparent violation...

  4. Northern States Power Company (NSP) Black Dog generating plant - Unit 2 emission reduction, capacity increase and life extension through atmospheric fluidized bed combustion (AFBC) retrofit

    SciTech Connect

    Jenness, B.L.; Rosendahl, S.M.; Gamble, R.L.

    1985-08-01

    The authors report on progress to date of the atmospheric fluidized-bed combustion (AFBC) boiler retrofit at the Black Dog Unit 2 plant of the Northern States Power Company. Construction began in September 1984 after the completion of technical and economic feasibility studies, and initial operation is scheduled for the second quarter of 1986. The project features the largest AFBC boiler to date, a 40 MW capacity regain/upgrade, and 25-year extension of unit life, low leakage regenerative air preheater design, electrostatic precipitator performance improvement, alternate fuel co-firing capacity, and reduced emission on a per MW basis. The authors describe the management and engineering developments associated with the project. 12 figures, 4 tables.

  5. SUNBURN: A computer code for evaluating the economic viability of hybrid solar central receiver electric power plants

    SciTech Connect

    Chiang, C.J.

    1987-06-01

    The computer program SUNBURN simulates the annual performance of solar-only, solar-hybrid, and fuel-only electric power plants. SUNBURN calculates the levelized value of electricity generated by, and the levelized cost of, these plants. Central receiver solar technology is represented, with molten salt as the receiver coolant and thermal storage medium. For each hour of a year, the thermal energy use, or dispatch, strategy of SUNBURN maximizes the value of electricity by operating the turbine when the demand for electricity is greatest and by minimizing overflow of thermal storage. Fuel is burned to augment solar energy if the value of electricity generated by using fuel is greater than the cost of the fuel consumed. SUNBURN was used to determine the optimal power plant configuration, based on value-to-cost ratio, for dates of initial plant operation from 1990 to 1998. The turbine size for all plants was 80 MWe net. Before 1994, fuel-only was found to be the preferred plant configuration. After 1994, a solar-only plant was found to have the greatest value-to-cost ratio. A hybrid configuration was never found to be better than both fuel-only and solar-only configurations. The value of electricity was calculated as The Southern California Edison Company's avoided generation costs of electricity. These costs vary with time of day. Utility ownership of the power plants was assumed. The simulation was performed using weather data recorded in Barstow, California, in 1984.

  6. Interior. Apparatus used in crushing and processing plant fibers to ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Interior. Apparatus used in crushing and processing plant fibers to extract latex from the sap during experiments to find native North American plant which would yield sufficiently high percentage of latex to produce natural rubber. - Thomas A. Edison Laboratories, Building No. 2, Main Street & Lakeside Avenue, West Orange, Essex County, NJ

  7. Parametric study of prospective early commercial MHD power plants (PSPEC). General Electric Company, task 1: Parametric analysis

    NASA Technical Reports Server (NTRS)

    Marston, C. H.; Alyea, F. N.; Bender, D. J.; Davis, L. K.; Dellinger, T. C.; Hnat, J. G.; Komito, E. H.; Peterson, C. A.; Rogers, D. A.; Roman, A. J.

    1980-01-01

    The performance and cost of moderate technology coal-fired open cycle MHD/steam power plant designs which can be expected to require a shorter development time and have a lower development cost than previously considered mature OCMHD/steam plants were determined. Three base cases were considered: an indirectly-fired high temperature air heater (HTAH) subsystem delivering air at 2700 F, fired by a state of the art atmospheric pressure gasifier, and the HTAH subsystem was deleted and oxygen enrichment was used to obtain requisite MHD combustion temperature. Coal pile to bus bar efficiencies in ease case 1 ranged from 41.4% to 42.9%, and cost of electricity (COE) was highest of the three base cases. For base case 2 the efficiency range was 42.0% to 45.6%, and COE was lowest. For base case 3 the efficiency range was 42.9% to 44.4%, and COE was intermediate. The best parametric cases in bases cases 2 and 3 are recommended for conceptual design. Eventual choice between these approaches is dependent on further evaluation of the tradeoffs among HTAH development risk, O2 plant integration, and further refinements of comparative costs.

  8. Public Schools: Insufficient Research To Determine Effectiveness of Selected Private Education Companies. Report to the Ranking Minority Member, Subcommittee on the District of Columbia, Committee on Appropriations, House of Representatives.

    ERIC Educational Resources Information Center

    Shaul, Marnie S.

    Over the past decade, a new kind of entity has emerged in public education: the for-profit provider of education and management services. This is a report on a study of the effectiveness of the programs of three such companies-Edison Schools, Mosaica Education, and Chancellor Beacon Academies-operating in 10 charter schools in the District of…

  9. PREFACE: 19th International Conference on Electron Dynamics in Semiconductors, Optoelectronics and Nanostructures (EDISON'19)

    NASA Astrophysics Data System (ADS)

    González, T.; Martín-Martínez, M. J.; Mateos, J.

    2015-10-01

    The 19th International Conference on Electron Dynamics in Semiconductors, Optoelectronics and Nanostructures (EDISON'19) was held at the Hospedería Fonseca (Universidad de Salamanca, Spain), on 29 June - 2 July, 2015, and was organized by the Electronics Area from the University of Salamanca. The Conference is held biannually and covers the recent progress in the field of electron dynamics in solid-state materials and devices. This was the 19th meeting of the international conference series formerly named Hot Carriers in Semiconductors (HCIS), first held in Modena in 1973. In the edition of 1997 in Berlin the name of the conference changed to International Conference on Nonequilibrium Carrier Dynamics in Semiconductors, keeping the same acronym, HCIS; and finally in the edition of Montpellier in 2009 the name was again changed to the current one, International Conference on Electron Dynamics in Semiconductors, Optoelectronics and Nanostructures (EDISON). The latest editions took place in Santa Barbara, USA, in 2011 and Matsue, Japan, in 2013. Research work on electron dynamics involves quite different disciplines, and requires both fundamental and technological scientific efforts. Attendees to the conference come mostly from academic institutions, belonging to both theoretical and experimental groups working in a variety of fields, such as solid-state physics, electronics, optics, electrical engineering, material science, laser physics, etc. In this framework, events like the EDISON conference become a basic channel for the progress in the field. Here, researchers working in different areas can meet, present their latest advances and exchange their ideas. The program of EDISON'19 included 13 invited papers, 61 oral contributions and 73 posters. These contributions originated from scientists in more than 30 different countries. The Conference gathered 140 participants, coming from 24 different countries, most from Europe, but also with a significant participation

  10. 77 FR 1667 - Nelson S. Galgoul, Av. Edison Passess 909, Rio De Janeiro, R.J., Brazil 20531-070, Respondent...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-11

    ..., the most recent being that of August 12, 2011 (76 FR 50,661 (Aug. 16, 2011)), has continued the... Bureau of Industry and Security Nelson S. Galgoul, Av. Edison Passess 909, Rio De Janeiro, R.J., Brazil... a last known address of Av. Edison Passess 909, Rio De Janeiro, R.J., Brazil 20531-070, and...

  11. EDISON-WMW: Exact Dynamic Programing Solution of the Wilcoxon-Mann-Whitney Test.

    PubMed

    Marx, Alexander; Backes, Christina; Meese, Eckart; Lenhof, Hans-Peter; Keller, Andreas

    2016-02-01

    In many research disciplines, hypothesis tests are applied to evaluate whether findings are statistically significant or could be explained by chance. The Wilcoxon-Mann-Whitney (WMW) test is among the most popular hypothesis tests in medicine and life science to analyze if two groups of samples are equally distributed. This nonparametric statistical homogeneity test is commonly applied in molecular diagnosis. Generally, the solution of the WMW test takes a high combinatorial effort for large sample cohorts containing a significant number of ties. Hence, P value is frequently approximated by a normal distribution. We developed EDISON-WMW, a new approach to calculate the exact permutation of the two-tailed unpaired WMW test without any corrections required and allowing for ties. The method relies on dynamic programing to solve the combinatorial problem of the WMW test efficiently. Beyond a straightforward implementation of the algorithm, we presented different optimization strategies and developed a parallel solution. Using our program, the exact P value for large cohorts containing more than 1000 samples with ties can be calculated within minutes. We demonstrate the performance of this novel approach on randomly-generated data, benchmark it against 13 other commonly-applied approaches and moreover evaluate molecular biomarkers for lung carcinoma and chronic obstructive pulmonary disease (COPD). We found that approximated P values were generally higher than the exact solution provided by EDISON-WMW. Importantly, the algorithm can also be applied to high-throughput omics datasets, where hundreds or thousands of features are included. To provide easy access to the multi-threaded version of EDISON-WMW, a web-based solution of our algorithm is freely available at http://www.ccb.uni-saarland.de/software/wtest/. PMID:26829645

  12. EDISON-WMW: Exact Dynamic Programing Solution of the Wilcoxon–Mann–Whitney Test

    PubMed Central

    Marx, Alexander; Backes, Christina; Meese, Eckart; Lenhof, Hans-Peter; Keller, Andreas

    2016-01-01

    In many research disciplines, hypothesis tests are applied to evaluate whether findings are statistically significant or could be explained by chance. The Wilcoxon–Mann–Whitney (WMW) test is among the most popular hypothesis tests in medicine and life science to analyze if two groups of samples are equally distributed. This nonparametric statistical homogeneity test is commonly applied in molecular diagnosis. Generally, the solution of the WMW test takes a high combinatorial effort for large sample cohorts containing a significant number of ties. Hence, P value is frequently approximated by a normal distribution. We developed EDISON-WMW, a new approach to calculate the exact permutation of the two-tailed unpaired WMW test without any corrections required and allowing for ties. The method relies on dynamic programing to solve the combinatorial problem of the WMW test efficiently. Beyond a straightforward implementation of the algorithm, we presented different optimization strategies and developed a parallel solution. Using our program, the exact P value for large cohorts containing more than 1000 samples with ties can be calculated within minutes. We demonstrate the performance of this novel approach on randomly-generated data, benchmark it against 13 other commonly-applied approaches and moreover evaluate molecular biomarkers for lung carcinoma and chronic obstructive pulmonary disease (COPD). We found that approximated P values were generally higher than the exact solution provided by EDISON-WMW. Importantly, the algorithm can also be applied to high-throughput omics datasets, where hundreds or thousands of features are included. To provide easy access to the multi-threaded version of EDISON-WMW, a web-based solution of our algorithm is freely available at http://www.ccb.uni-saarland.de/software/wtest/. PMID:26829645

  13. Tools and data acquisition of borehole geophysical logging for the Florida Power and Light Company Turkey Point Power Plant in support of a groundwater, surface-water, and ecological monitoring plan, Miami-Dade County, Florida

    USGS Publications Warehouse

    Wacker, Michael A.

    2010-01-01

    Borehole geophysical logs were obtained from selected exploratory coreholes in the vicinity of the Florida Power and Light Company Turkey Point Power Plant. The geophysical logging tools used and logging sequences performed during this project are summarized herein to include borehole logging methods, descriptions of the properties measured, types of data obtained, and calibration information.

  14. 76 FR 42725 - Notice of Availability of the Record of Decision for the Southern California Edison Company...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-19

    ... Bureau of Land Management Notice of Availability of the Record of Decision for the Southern California... Management, Interior. ACTION: Notice of availability. SUMMARY: The Bureau of Land Management (BLM) and the.... The Palm Springs Field Manager signed the ROD, which constitutes the final decision of the BLM...

  15. Three Permeable Pavements Performances for Priority Metal Pollutants and Metals associated with Deicing Chemicals from Edison Parking Lot, NJ - abstract

    EPA Science Inventory

    The U.S. Environmental Protection Agency constructed a 4000-m2 parking lot in Edison, New Jersey in 2009. The parking lot is surfaced with three permeable pavements [permeable interlocking concrete pavers (PICP), pervious concrete (PC), and porous asphalt (PA)]. Samples of each p...

  16. Thomas Edison State College and Colorado State University: Using Cutting-Edge Technology to Enhance CE Unit Success

    ERIC Educational Resources Information Center

    van Zyl, Henry; Powell, Albert, Jr.

    2012-01-01

    Thomas Edison State College (TESC) and Colorado State University (CSU) offer significant contrasts in institutional culture, student demographics, faculty and institutional priorities and approaches to distance education course development and delivery. This article offers case studies showing that widely disparate program design and delivery…

  17. THE DEVELOPMENT OF A BEGINNING READING SKILLS PROGRAM USING THE EDISON RESPONSIVE ENVIRONMENTS INSTRUMENT. FOURTH PROGRESS REPORT.

    ERIC Educational Resources Information Center

    GOTKIN, LASSAR G.; MCSWEENEY, JOSEPH

    A FOURTH PROGRESS REPORT ON THE DEVELOPMENT OF A BEGINNING READING SKILLS PROGRAM USING THE EDISON RESPONSIVE ENVIRONMENTS INSTRUMENT IS PRESENTED. THE ACQUISITION OF A SEQUENCE OF COMPLEX BEGINNING READING SKILLS IS EXAMINED. MOTIVATIONAL STRATEGIES ARE DISCUSSED. THE FOLLOWING HYPOTHESES WERE TESTED IN FIELD STUDIES--(1) THE EFFECTS OF TWO TYPES…

  18. SunEdison Photovoltaic Grid Integration Evaluation: Cooperative Research and Development Final Report, CRADA Number CRD-08-302

    SciTech Connect

    Kroposki, B.

    2012-09-01

    Under this Agreement, NREL will work with SunEdison to monitor and analyze the performance of photovoltaic (PV) systems as they relate to grid integration. Initially this project will examine the performance of PV systems with respect to evaluating the benefits and impacts on the electric power grid.

  19. Three Permeable Pavements Performances for Priority Metal Pollutants and Metals Associated with Deicing Chemicals from Edison Parking Lot, NJ

    EPA Science Inventory

    The U.S. Environmental Protection Agency constructed a 4000-m2 parking lot in Edison, New Jersey in 2009. The parking lot is surfaced with three permeable pavements [permeable interlocking concrete pavers (PICP), pervious concrete (PC), and porous asphalt (PA)]. Samples of each p...

  20. PROCEEDINGS OF WORKSHOP ON MICROORGANISMS IN URBAN STORMWATER HELD AT EDISON, NEW JERSEY, ON MARCH 24, 1975

    EPA Science Inventory

    This workshop was held on March 29, 1975 at the USEPA Office, Edison, New Jersey. The aim was to exchange information obtained from USEPA Office of Research and Development, Storm and Combined Sewer Program sponsored projects so as to foster a better understanding of microorganis...

  1. 78 FR 49749 - Southern California Edison, City of Banning, California; Notice of Meeting To Conduct a Technical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-15

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Southern California Edison, City of Banning, California; Notice of Meeting To Conduct a Technical Conference for the San Gorgonio Hydroelectric Project and the Proposed Whitewater Flume Water Power Project a. Date...

  2. 48. MAP OF SANTA ANA RIVER POWER PLANT NO. 2 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    48. MAP OF SANTA ANA RIVER POWER PLANT NO. 2 OF THE EDISON ELECTRIC CO. THROUGH UNSURVEYED LAND IN THE SAN BERNARDINO FOREST RESERVE, APPROVED MAY 26, 1904, F. C. FINKLE, CHIEF HYDRAULIC ENGINEER. SCE drawing no. 53988. - Santa Ana River Hydroelectric System, Redlands, San Bernardino County, CA

  3. Commercial low-Btu coal-gasification plant. Feasibility study: General Refractories Company, Florence, Kentucky. Volume I. Project summary. [Wellman-Galusha

    SciTech Connect

    1981-11-01

    In response to a 1980 Department of Energy solicitation, the General Refractories Company submitted a Proposal for a feasibility study of a low Btu gasification facility for its Florence, KY plant. The proposed facility would substitute low Btu gas from a fixed bed gasifier for natural gas now used in the manufacture of insulation board. The Proposal from General Refractories was prompted by a concern over the rising costs of natural gas, and the anticipation of a severe increase in fuel costs resulting from deregulation. The proposed feasibility study is defined. The intent is to provide General Refractories with the basis upon which to determine the feasibility of incorporating such a facility in Florence. To perform the work, a Grant for which was awarded by the DOE, General Refractories selected Dravo Engineers and Contractors based upon their qualifications in the field of coal conversion, and the fact that Dravo has acquired the rights to the Wellman-Galusha technology. The LBG prices for the five-gasifier case are encouraging. Given the various natural gas forecasts available, there seems to be a reasonable possibility that the five-gasifier LBG prices will break even with natural gas prices somewhere between 1984 and 1989. General Refractories recognizes that there are many uncertainties in developing these natural gas forecasts, and if the present natural gas decontrol plan is not fully implemented some financial risks occur in undertaking the proposed gasification facility. Because of this, General Refractories has decided to wait for more substantiating evidence that natural gas prices will rise as is now being predicted.

  4. Field Demonstration of a 24-kV Superconducting Cable at Detroit Edison

    SciTech Connect

    Kelley, Nathan; Corsaro, Pietro

    2004-12-01

    Customer acceptance of high temperature superconducting (HTS) cable technology requires a substantial field demonstration illustrating both the system's technical capabilities and its suitability for installation and operation within the utility environment. In this project, the world's first underground installation of an HTS cable using existing ductwork, a 120 meter demonstration cable circuit was designed and installed between the 24 kV bus distribution bus and a 120 kV-24 kV transformer at Detroit Edison's Frisbie substation. The system incorporated cables, accessories, a refrigeration system, and control instrumentation. Although the system was never put in operation because of problems with leaks in the cryostat, the project significantly advanced the state-of-the-art in the design and implementation of Warm Dielectric cable systems in substation applications. Lessons learned in this project are already being incorporated in several ongoing demonstration projects.

  5. Dakota Gasification Company - ammonia scrubber

    SciTech Connect

    Wallach, D.L.

    1995-12-31

    Amain stack BACT assessment for sulfur dioxide emissions conducted in 1990 for the Dakota Gasification Company`s (DGC) Great Plains Synfuels Plant identified wet limestone flue gas desulfurization system as BACT. During the development of the design specification for the wet limestone FGD, GE Environmental Systems Inc. and DGC jointly demonstrated a new ammonia-based process for flue gas desulfurization on a large pilot plant located at the Great Plains Synfuels Plant. The production of saleable ammonium sulfate, rather than a waste product, was of interest to DGC as it fit into the plant`s on-going by-product recovery efforts. With the success of the pilot plant, DGC and GEESI entered into an agreement to build the first commercial scale Ammonium Sulfate Forced Oxidation FGD system. Construction of this system is well in progress with an anticipated start-up date of August, 1996.

  6. Distributed Energy Alternative to Electrical Distribution Grid Expansion in Consolidated Edison Service Territory

    SciTech Connect

    Kingston, Tim; Kelly, John

    2008-08-01

    The nation's power grid, specifically the New York region, faces burgeoning energy demand and suffers from congested corridors and aging equipment that cost New York consumers millions of dollars. Compounding the problem is high-density buildup in urban areas that limits available space to expand grid capacity. Coincidently, these urban areas are precisely where additional power is required. DER in this study refers to combined heat and power (CHP) technology, which simultaneously generates heat and electricity at or near the point where the energy will be consumed. There are multiple CHP options available that, combined with a portfolio of other building energy efficiency (EE) strategies, can help achieve a more efficient supply-demand balance than what the grid can currently provide. As an alternative to expanding grid capacity, CHP and EE strategies can be deployed in a flexible manner at virtually any point on the grid to relieve load. What's more, utilities and customers can install them in a variety of potentially profitable applications that are more environmentally friendly. Under the auspices of the New York State Energy Research and Development Authority (NYSERDA) and the Oak Ridge National Laboratory representing the Office of Electricity of the U.S. Department of Energy, Gas Technology Institute (GTI) conducted this study in cooperation with Consolidated Edison to help broaden the market penetration of EE and DER. This study provides realistic load models and identifies the impacts that EE and DER can have on the electrical distribution grid; specifically within the current economic and regulatory environment of a high load growth area of New York City called Hudson Yards in Midtown Manhattan. These models can be used to guide new policies that improve market penetration of appropriate CHP and EE technologies in new buildings. The following load modeling scenarios were investigated: (1) Baseline: All buildings are built per the Energy Conservation

  7. Environmental quandary shuts Mohave plants

    SciTech Connect

    2006-03-15

    The 1,580 MW coal-fired Mohave Generating Station in Laughlin, NV was closed on 31 December 2005 and is expected to be closed for four years whilst the owners Southern California Edison sort out battles over the plant's pollutant emissions and negotiate with two native tribes over rights to the water needed to deliver fuel to Mohave as a slurry. The plant was forced to close because it was unable to comply with a 1999 court order to reduce emissions of sulphur dioxide, nitrogen oxides and particulates. 1 photo.

  8. 77 FR 64974 - Combined Notice of Filings #2

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-24

    ...: ER13-133-000. Applicants: Sycamore Cogeneration Company, Southern California Edison Company. Description: Application of Sycamore Cogeneration Company and Southern California Edison Company for...

  9. 114. JOB NO. 1347K, SHEET 1M, 1929, FORD MOTOR COMPANY; ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    114. JOB NO. 1347-K, SHEET 1M, 1929, FORD MOTOR COMPANY; BOILER HOUSE ASSEMBLY PLANT; PLAN - Ford Motor Company Long Beach Assembly Plant, Assembly Building, 700 Henry Ford Avenue, Long Beach, Los Angeles County, CA

  10. 113. JOB NO. 1347K, SHEET 2M, 1929, FORD MOTOR COMPANY; ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    113. JOB NO. 1347-K, SHEET 2M, 1929, FORD MOTOR COMPANY; BOILER HOUSE ASSEMBLY PLANT; SECTIONS - Ford Motor Company Long Beach Assembly Plant, Assembly Building, 700 Henry Ford Avenue, Long Beach, Los Angeles County, CA

  11. 115. JOB NO. 1347K, SHEET 3M, 1929/1930, FORD MOTOR COMPANY; ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    115. JOB NO. 1347-K, SHEET 3M, 1929/1930, FORD MOTOR COMPANY; BOILER HOUSE ASSEMBLY PLANT; BOILER SETTING - Ford Motor Company Long Beach Assembly Plant, Assembly Building, 700 Henry Ford Avenue, Long Beach, Los Angeles County, CA

  12. Status and Progress of a Fault Current Limiting Hts Cable to BE Installed in the con EDISON Grid

    NASA Astrophysics Data System (ADS)

    Maguire, J.; Folts, D.; Yuan, J.; Henderson, N.; Lindsay, D.; Knoll, D.; Rey, C.; Duckworth, R.; Gouge, M.; Wolff, Z.; Kurtz, S.

    2010-04-01

    In the last decade, significant advances in the performance of second generation (2G) high temperature superconducting wire have made it suitable for commercially viable applications such as electric power cables and fault current limiters. Currently, the U.S. Department of Homeland Security is co-funding the design, development and demonstration of an inherently fault current limiting HTS cable under the Hydra project with American Superconductor and Consolidated Edison. The cable will be approximately 300 m long and is being designed to carry 96 MVA at a distribution level voltage of 13.8 kV. The underground cable will be installed and energized in New York City. The project is led by American Superconductor teamed with Con Edison, Ultera (Southwire and nkt cables joint venture), and Air Liquide. This paper describes the general goals, design criteria, status and progress of the project. Fault current limiting has already been demonstrated in 3 m prototype cables, and test results on a 25 m three-phase cable will be presented. An overview of the concept of a fault current limiting cable and the system advantages of this unique type of cable will be described.

  13. Customer Impact Evaluation for the 2009 Southern California Edison Participating Load Pilot

    SciTech Connect

    Gifford, William; Bodmann, Shawn; Young, Paul; Eto, Joseph H.; Laundergan, Jeremy

    2010-05-28

    The 2009 Participating Load Pilot Customer Impact Evaluation provides evidence that short duration demand response events which cycle off air conditioners for less than thirty minutes in a hot, dry environment do not lead to a significant degradation in the comfort level of residents participating in the program. This was investigated using: (1) Analysis of interval temperature data collected from inside residences of select program participants; and (2) Direct and indirect customer feedback from surveys designed and implemented by Southern California Edison at the conclusion of the program season. There were 100 indoor temperature monitors that were acquired by LBNL for this study that transmitted temperature readings at least once per hour with corresponding timestamps during the program season, June-October, 2009. Recorded temperatures were transferred from the onsite telemetry devices to a mesh network, stored, and then delivered to KEMA for analysis. Following an extensive data quality review, temperature increases during each of the thirty demand response test events were calculated for each device. The results are as follows: (1) Even for tests taking place during outside temperatures in excess of 100 degrees Fahrenheit, over 85 percent of the devices measured less than a 0.5 degree Fahrenheit temperature increase indoors during the duration of the event. (2) For the increases that were observed, none was more than 5 degrees and it was extremely rare for increases to be more than 2 degrees. At the end of the testing season SCE and KEMA designed and conducted a survey of the a facilities and public works managers and approximately 100 customers feedback survey to assess the extent the PLP events were noticed or disrupted the comfort level of participants. While only a small sampling of 3 managers and 16 customer surveys were completed, their responses indicate: (1) No customer reported even a moderate level of discomfort from the cycling-off of their air

  14. Alexander Graham Bell's Patent for the Telephone and Thomas Edison's Patent for the Electric Lamp. The Constitution Community: The Development of the Industrial United States (1870-1900).

    ERIC Educational Resources Information Center

    Schur, Joan Brodsky

    In 1876 Americans held a Centennial Exhibition in Philadelphia (Pennsylvania) to celebrate the nation's birth 100 years earlier. Machinery Hall drew the most admiration and wonder. Alexander Graham Bell exhibited the first telephone, and Thomas Alva Edison presented the automatic telegraph, one of more than 1,000 inventions he would patent in his…

  15. The ARCO 1 megawatt Photovoltaic Power Plant

    NASA Astrophysics Data System (ADS)

    Rhodes, G. W.; Reilly, M. R.

    The world's largest Photovoltaic Power Plant is in operation and meeting performance specifications on the Southern California Edison (SCE) grid near Hesperia, California. The 1 MW plant designed and constructed by The BDM Corporation, for ARCO Solar Inc., occupies a 20 acre site adjacent to the SCE Lugo substation. The entire design and construction process took 7 1/2 months and was not only on schedule but below budget. Because of its vast photovoltaic experience, BDM was chosen over several engineering firms to perform this complex job. We were provided a conceptual design from ARCO which we quickly refined and immediately initiated construction.

  16. Health hazard evaluation determination report number MHETA-82-006-9002, Sewell Coal Company, Number 1 Preparation Plant, Nettie, West Virginia, VA

    SciTech Connect

    Patil, A.; Corwell, R.J.

    1982-08-01

    The potential health effects of exposure to a coal antifreeze agent, Wendon-NF-40 were examined. The study was requested by the United Mine Workers of America and was conducted on March 8, 1982 at the Sewell Coal Company No. 1 Preparation Facility (SIC-1211), Nettie, West Virginia. The antifreeze agent was sprayed on the coal as it fell from a conveyer belt into a large hopper. The spraying operation was enclosed except at one side. The preliminary on site investigation was conducted after the facility had discontinued using the antifreeze agent. Therefore, only bulk samples were collected for qualitative analysis. Workers were interviewed by a NIOSH physician. The qualitative analysis revealed that the primary component of the antifreeze was diethylene-glycol (111466). Two of 10 workers interviewed complained of health problems they felt were related to exposure to Wendon-NF-40. Their symptoms included headache and skin irritation. Due to lack of environmental sampling, NIOSH was unable to determine that a hazard from overexposure to Wendon-NF-40 existed. The authors suggest that organic vapor respirators should be worn by workers when they are in area where inhalation of the mists or sprays is likely.

  17. Industrial hygiene walk-through survey report of E. I. Dupont de Nemours and Company, Inc. , Chocolate Bayou Plant, Alvin, Texas

    SciTech Connect

    Fajen, J.M.

    1985-05-01

    A walkthrough survey of EI duPont deNemours and Company, Incorporated, Alvin, Texas was conducted in November, 1984. The purpose of the survey was to obtain information on the 1,3-butadiene monomer manufacturing process and the potential for exposure. The facility manufactured a crude product stream containing 1,3-butadiene as a coproduct of its ethylene process. The crude was refined to a 99.5% 1,3-butadiene product. The refining process occurred in a closed system, tightly maintained for economic, fire, and health-hazard reasons. The product was transferred by way of a pipeline to storage spheres for later transport off site. The facility used an open-loop cylinder (bomb) technique for quality control sampling. All pumps were equipped with single mechanical seals, which were in the process of being replaced by tandem seals. Since 1962, the facility had experienced process changes and three changes of ownership. Because of these changes, records from previous owners of industrial hygiene monitoring were not available. Job titles identified as having potential exposure were processors, wage employee supervisors, production engineers, and laboratory technicians. The author concludes that a closed-loop manual quality-control sampling system should be installed to reduce exposure from this source.

  18. 3. Credit PEM. Interior of Martinsburg plant showing two MacIntousch ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. Credit PEM. Interior of Martinsburg plant showing two MacIntousch Seymore steam engines and one Taylor steam engine belt driving (from let to right) a sperry 30 light, 220 Volt generator, a Westinghouse 900 light, 2200 Volt generator, a Ball 80 light are generator, and two Edison, 900 light, 220 Volt generators. Note switchboard to left. Photo c. 1896. - Dam No. 4 Hydroelectric Plant, Potomac River, Martinsburg, Berkeley County, WV

  19. Summary of Dissimilar Metal Joining Trials Conducted by Edison Welding Institute

    SciTech Connect

    MJ Lambert

    2005-11-18

    Under the direction of the NASA-Glenn Research Center, the Edison Welding Institute (EWI) in Columbus, OH performed a series of non-fusion joining experiments to determine the feasibility of joining refractory metals or refractory metal alloys to Ni-based superalloys. Results, as reported by EWI, can be found in the project report for EWI Project 48819GTH (Attachment A, at the end of this document), dated October 10, 2005. The three joining methods used in this investigation were inertia welding, magnetic pulse welding, and electro-spark deposition joining. Five materials were used in these experiments: Mo-47Re, T-111, Hastelloy X, Mar M-247 (coarse-grained, 0.5 mm to several millimeter average grain size), and Mar M-247 (fine-grained, approximately 50 {micro}m average grain size). Several iterative trials of each material combination with each joining method were performed to determine the best practice joining method. Mo-47Re was found to be joined easily to Hastelloy X via inertia welding, but inertia welding of the Mo-alloy to both Mar M-247 alloys resulted in inconsistent joint strength and large reaction layers between the two metals. T-111 was found to join well to Hastelloy X and coarse-grained Mar M-247 via inertia welding, but joining to fine-grained Mar M-247 resulted in low joint strength. Magnetic pulse welding (MPW) was only successful in joining T-111 tubing to Hastelloy X bar stock. The joint integrity and reaction layer between the metals were found to be acceptable. This single joining trial, however, caused damage to the electromagnetic concentrators used in this process. Subsequent design efforts to eliminate the problem resulted in a loss of power imparted to the accelerating work piece, and results could not be reproduced. Welding trials of Mar M-247 to T-111 resulted in catastrophic failure of the bar stock, even at lower power. Electro-spark deposition joining of Mo-47Re, in which the deposited material was Hastelloy X, did not have a

  20. Section 1: Company directory

    SciTech Connect

    Not Available

    1991-12-01

    This is a 1992 directory of those companies doing business in all areas of the independent power producers industry. The listing includes the company name, address, telephone and FAX numbers, and the name of a company contact. The listing is international in scope.

  1. Neural networks for control of NO{sub x} emissions in fossil plants

    SciTech Connect

    Reifman, J.; Feldman, E.E.

    1997-04-01

    We discuss the use of two classes of artificial neural networks, multilayer feedforward networks and fully-recurrent networks, in the development of a closed-loop controller for discrete-time dynamical systems. We apply the neural system to the control of oxides of nitrogen (NO{sub x}) emissions for a simplified representation of a furnace of a coal-fired fossil plant. Plant data from one of Commonwealth Edison`s fossil power plants were used to build a recurrent neural model of NO{sub x} formation which is then used in the training of the feedforward neural controller. Preliminary simulation results demonstrate the feasibility of the approach and additional tests with increasingly realistic models should be pursued.

  2. 53. Photocopy of photograph, c. 1946. GENERAL INTERIOR VIEW OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    53. Photocopy of photograph, c. 1946. GENERAL INTERIOR VIEW OF GENERATOR ROOM. (Courtesy of the Potomac Edison Company Library (Hagerstown, MD), Historical Data Files, Dam No. 5 listing) - Dam No. 5 Hydroelectric Plant, On Potomac River, Hedgesville, Berkeley County, WV

  3. 60. Photocopy of photograph, no date. DETAIL OF SWITCHBOARD. (Courtesy ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    60. Photocopy of photograph, no date. DETAIL OF SWITCHBOARD. (Courtesy of the Potomac Edison Company Library (Hagerstown, MD), Historical Data Files, Properties-Buildings and Equipment listing) - Dam No. 5 Hydroelectric Plant, On Potomac River, Hedgesville, Berkeley County, WV

  4. 61. Photocopy of photograph, c. 1949. DETAIL OF SWITCHBOARD WITH ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    61. Photocopy of photograph, c. 1949. DETAIL OF SWITCHBOARD WITH MODIFICATIONS. (Courtesy of the Potomac Edison Company Library (Hagerstown, MD), Historical Data Files, Dam No. 5 listing) - Dam No. 5 Hydroelectric Plant, On Potomac River, Hedgesville, Berkeley County, WV

  5. 75 FR 5075 - Coalinga Cogeneration Company, Kern River Cogeneration Company, Mid-Set Cogeneration Company...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-01

    ...-612-000; ER10-611-000] Coalinga Cogeneration Company, Kern River Cogeneration Company, Mid-Set Cogeneration Company, Salinas River Cogeneration Company, Sargent Canyon Cogeneration Company, Sycamore Cogeneration Company; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for...

  6. 107. JOB NO. 1347T, SHEET IS, 1930, FORD MOTOR COMPANY; ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    107. JOB NO. 1347-T, SHEET IS, 1930, FORD MOTOR COMPANY; REINFORCEMENT OF GRAVITY TANK - Ford Motor Company Long Beach Assembly Plant, Assembly Building, 700 Henry Ford Avenue, Long Beach, Los Angeles County, CA

  7. 49. OVERALL VIEW OF COMMERCIAL/INDUSTRIAL DISTRICT SHOWING SWIFT AND COMPANY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    49. OVERALL VIEW OF COMMERCIAL/INDUSTRIAL DISTRICT SHOWING SWIFT AND COMPANY MEAT PROCESSING PLANT IN CENTER FOREGROUND AND FARLEY AND LOETSCHER MANUFACTURING COMPANY WAREHOUSE ANNEX IN CENTRAL BACKGROUND. VIEW TO NORTHEAST. - Dubuque Commercial & Industrial Buildings, Dubuque, Dubuque County, IA

  8. 78 FR 66785 - Luminant Generation Company, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-06

    ... consecutive weeks of ] a combined license (COL) application from Luminant Generation Company, LLC. (Luminant... applications for COLs with the NRC, pursuant to Section 103 of the Atomic Energy Act of 1954, as amended, and... for Nuclear Power Plants:'' 1. On September 19, 2008, Luminant submitted an application for COLs...

  9. Determining the Appropriate Package and Transportation Methodology for the Detroit Edison, Fermi II Msrs and Associated Components

    SciTech Connect

    Weber, B.

    2007-07-01

    During the spring of 2005, Detroit Edison, Enrico Fermi II Nuclear Power Station (Fermi) decided to disposition two MSRs and associated components scheduled for replacement in the spring of 2006 during the MSR Replacement Outage. Of concern to Fermi was the proper packaging and transportation methodology when dis-positioning a component measuring approximately 110' in length and 13' in diameter and weighing over 300 tons. Upon removal from the Turbine Deck the retired MSRs and associated components were turned over to the Rad Waste Group for packaging and final disposition. Fermi requested quotations from vendors to package, transport, and disposition the MSRs and associated components. However, multiple Vendors informed Fermi that the size and weight of the MSRs were questionable in passing permitting requirements and would require segmentation and volume reduction on site or at a waste processor. Fermi contracted with MHF Logistical Solutions (MHF-LS) based on their ability to receive clearances for shipping the MSRs in one piece via two heavy haul rail conveyances acting as a bolstered load with professionally engineered blocking and bracing configured to support the retired MSRs. (authors)

  10. Clevidipine (the Medicines Company).

    PubMed

    Zhang, Hongwei

    2002-10-01

    The Medicines Company (under license from AstraZeneca) is developing clevidipine, a short-acting dihydropyridine calcium antagonist, for the potential treatment of peri-operative hypertension. By 1997, the compound was undergoing phase II clinical evaluation by the original developer, AstraZeneca. By March 2002, The Medicines Company was conducting phase III clinical trials.

  11. The mortality of companies

    PubMed Central

    Daepp, Madeleine I. G.; Hamilton, Marcus J.; West, Geoffrey B.; Bettencourt, Luís M. A.

    2015-01-01

    The firm is a fundamental economic unit of contemporary human societies. Studies on the general quantitative and statistical character of firms have produced mixed results regarding their lifespans and mortality. We examine a comprehensive database of more than 25 000 publicly traded North American companies, from 1950 to 2009, to derive the statistics of firm lifespans. Based on detailed survival analysis, we show that the mortality of publicly traded companies manifests an approximately constant hazard rate over long periods of observation. This regularity indicates that mortality rates are independent of a company's age. We show that the typical half-life of a publicly traded company is about a decade, regardless of business sector. Our results shed new light on the dynamics of births and deaths of publicly traded companies and identify some of the necessary ingredients of a general theory of firms. PMID:25833247

  12. The mortality of companies.

    PubMed

    Daepp, Madeleine I G; Hamilton, Marcus J; West, Geoffrey B; Bettencourt, Luís M A

    2015-05-01

    The firm is a fundamental economic unit of contemporary human societies. Studies on the general quantitative and statistical character of firms have produced mixed results regarding their lifespans and mortality. We examine a comprehensive database of more than 25 000 publicly traded North American companies, from 1950 to 2009, to derive the statistics of firm lifespans. Based on detailed survival analysis, we show that the mortality of publicly traded companies manifests an approximately constant hazard rate over long periods of observation. This regularity indicates that mortality rates are independent of a company's age. We show that the typical half-life of a publicly traded company is about a decade, regardless of business sector. Our results shed new light on the dynamics of births and deaths of publicly traded companies and identify some of the necessary ingredients of a general theory of firms.

  13. Economic Potential of CHP in Detroit Edison Service Area: the Customer Perspective

    SciTech Connect

    Kelly, J.

    2003-10-10

    DOE's mission under the Distributed Energy and Electricity Reliability (DEER) Program is to strengthen America's electric energy infrastructure and provide utilities and consumers with a greater array of energy-efficient technology choices for generating, transmitting, distributing, storing, and managing demand for electric power and thermal energy. DOE recognizes that distributed energy technologies can help accomplish this mission. Distributed energy (DE) technologies have received much attention for the potential energy savings and electric power reliability assurances that may be achieved by their widespread adoption. Fueling the attention has been the desire to reduce greenhouse gas emissions and concern about easing power transmission and distribution system capacity limitations and congestion. However, these benefits may come at a cost to the electric utility companies in terms of lost revenue and other potential impacts on the distribution system. It is important to assess the costs and benefits of DE to consumers and distribution system companies. DOE commissioned this study to assess the costs and benefits of DE technologies to consumers and to better understand the effect of DE on the grid. Current central power generation units vent more waste heat (energy) than the entire transportation sector consumes and this wasted thermal energy is projected to grow by 45% within the next 20 years. Consumer investment in technologies that increase power generation efficiency is a key element of the DOE Energy Efficiency program. The program aims to increase overall cycle efficiency from 30% to 70% within 20 years as well. DOE wants to determine the impact of DE in several small areas within cities across the U.S. Ann Arbor, Michigan, was chosen as the city for this case study. Ann Arbor has electric and gas rates that can substantially affect the market penetration of DE. This case study analysis was intended to: (1) Determine what DE market penetration can

  14. Bemis Manufacturing Company: Compression Molding Company Saves More Than $22,000 Per Year by Implementing Industrial Energy Assessment Recommendations

    SciTech Connect

    Not Available

    2005-09-01

    Industrial Technologies Program's BestPractices case study based on a comprehensive plant assessment conducted at Bemis Manufacturing Company by ITP's Industrial Assessment Center in conjunction with The Society of the Plastics Industry, Inc.

  15. 78 FR 11638 - Michigan Consolidated Gas Company, DTE Gas Company, DTE Gas Company; Notice of Petition

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-19

    ... Energy Regulatory Commission Michigan Consolidated Gas Company, DTE Gas Company, DTE Gas Company; Notice... Docket Nos. PR13-29-000, and PR13-30-000 (not consolidated), Michigan Consolidated Gas Company (MichCon) and DTE Gas Company (DTE Gas) filed to institute a name change to both itself from MichCon to DTE...

  16. 9. North Plant, View of Canopied Loading Dock with Powerhouse ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. North Plant, View of Canopied Loading Dock with Powerhouse to Left, Looking Northwest - Atwater Kent Manufacturing Company, North Plant, 5000 Wissahickon Avenue, Philadelphia, Philadelphia County, PA

  17. Captive insurance companies.

    PubMed

    Strauss, Peter

    2014-01-01

    The landscape of the business world is changing; and now, more than ever, business owners are recognizing that life is filled with risks: known risk, calculated risk, and unexpected risk. Every day, businesses thrive or fail based on understanding the risk of owning and operating their business, and business owners are recognizing that there are alternative risk financing mechanisms other than simply taking out a basket of standard coverage as recommended by your friendly neighborhood agent. A captive insurance company is an insurance company established to provide a broad range of risk management capabilities to affiliated companies. The captive is owned by the business owner and can provide insurance to the business for potential future losses, whether or not the losses are already covered by a commercial carrier or are "self-insured." The premiums paid by your business are tax deductible. Meanwhile, the premiums that your captive collects are tax-free up to $1.2 million annually.

  18. Captive insurance companies.

    PubMed

    Strauss, Peter

    2014-01-01

    The landscape of the business world is changing; and now, more than ever, business owners are recognizing that life is filled with risks: known risk, calculated risk, and unexpected risk. Every day, businesses thrive or fail based on understanding the risk of owning and operating their business, and business owners are recognizing that there are alternative risk financing mechanisms other than simply taking out a basket of standard coverage as recommended by your friendly neighborhood agent. A captive insurance company is an insurance company established to provide a broad range of risk management capabilities to affiliated companies. The captive is owned by the business owner and can provide insurance to the business for potential future losses, whether or not the losses are already covered by a commercial carrier or are "self-insured." The premiums paid by your business are tax deductible. Meanwhile, the premiums that your captive collects are tax-free up to $1.2 million annually. PMID:25807627

  19. Delano Biomass Power Plant

    SciTech Connect

    Middleton, M.; Hendershaw, W.K.; Corbin, H.R.; Taylor, T.A.

    1995-12-31

    The Delano Biomass Power Plant utilizes orchard prunings, urban wood waste, almond shells, and cotton stalks to fuel a boiler for steam generation. The steam is condensed in a steam turbine/generator to produce 31.8 MW of power. The electrical power generated (27 MW net) is then sold to Southern California Edison Co. for distribution. By incorporating a cooling tower, demineralizer, brine concentration tower, and evaporation ponds this system is able to achieve zero discharge. Steam at 97{degrees}F is condensed with cooling water. The cooling water is recirculated through an evaporator tower. Due to the temperature of the water entering the tower (83{degrees}F), evaporation occurs leaving behind concentrated salts. A blowdown is used to remove these salts from the tower. Losses from evaporation or leaks require make up to the tower. Wastewater from various processes in the plant are passed to a brine concentration tower. This concentrate is then taken to the evaporation ponds. Concentrated blowdown of small volumes (approximately 2-4 gpm) from the brine tower is disposed of in evaporation ponds.

  20. 75 FR 13524 - Northern Natural Gas Company, Southern Natural Gas Company, Florida Gas Transmission Company, LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-22

    ... Energy Regulatory Commission Northern Natural Gas Company, Southern Natural Gas Company, Florida Gas Transmission Company, LLC, Transcontinental Gas Pipe Line Company, LLC, Enterprise Field Services, LLC; Notice of Application March 16, 2010. Take notice that on March 5, 2010, Northern Natural Gas...

  1. Superfund Record of Decision (EPA Region 2): Kin-Buc Landfill, Operable Unit I, Edison Township, Middlesex County, New Jersey (first remedial action), September 1988

    SciTech Connect

    Not Available

    1988-09-01

    The 220-acre Kin-Buc Landfill consists of a number of inactive industrial- and municipal-waste disposal areas and is located in the Raritan River 100-year flood plain and within a coastal zone in Edison Township, Middlesex County, New Jersey. Landfill operations were conducted between 1947 and 1977. Examples of wastes received include solvents, waste oils, paint sludges, cyanides, metal stripping waste and paint thinners. The selected remedial action for this site includes: installation of a slurry wall surrounding the site; RCRA capping over Kin-Buc II, a portion of the low-lying area between Kin-Buc I and the Edison Landfill, and Pool C; maintenance and upgrading, if necessary, of the Kin-Buc I cap; collection of approximately 3 million gallons of oily-phase leachate with offsite incineration and residual disposal; collection and onsite biological or carbon treatment of aqueous-phase leachate and contaminated ground water with discharge either to surface water or POTW, and dewatering of residual sludges and offsite disposal; ground water monitoring; and O M.

  2. 2. Credit PEM. View of Martinsburg Power Company steam generating ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. Credit PEM. View of Martinsburg Power Company steam generating plant. From right to left: original 1889 generating building, transformer room, new generating room and, adjacent to draft stack is boiler room addition. Photo c. 1911. - Dam No. 4 Hydroelectric Plant, Potomac River, Martinsburg, Berkeley County, WV

  3. 21. ORIGINAL COMPANY HOUSE AT CORNER OF SANTA ANA AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    21. ORIGINAL COMPANY HOUSE AT CORNER OF SANTA ANA AND ANAHEIM BLVDS. (BEHIND HOUSE IN CA-242-20), WHICH IS BEING PREPARED FOR DEMOLITION. - Gene Pump Plant, South of Gene Wash Reservoir, 2 miles west of Whitsett Pump Plant, Parker Dam, San Bernardino County, CA

  4. The Electric Company.

    ERIC Educational Resources Information Center

    Children's Television Workshop, New York, NY.

    This book is intended as an introduction to the television program, "The Electric Company," designed to help teach reading to children in grades 2-4 who are experiencing difficulty. Contents include: Sidney P. Marland, Jr.'s preface, "A Significant New Teaching Tool"; Joan Ganz Cooney's "Television and the Teaching of Reading"; and Barbara…

  5. What Companies Look For.

    ERIC Educational Resources Information Center

    Rosenberg, Ronald

    1985-01-01

    Examines reasons why technology companies are locating new facilities in various areas across the country. Also explains a microelectronics firm's paramount concern of selecting a site with proximity to university research and technical education, a criterion recognized as essential by industry when selecting a potential site. (DH)

  6. Smart customers, dumb companies.

    PubMed

    Locke, C

    2000-01-01

    Customers today are being bombarded with an overwhelming array of choices. To alleviate customer frustration, say Steven Cristol and Peter Sealey in Simplicity Marketing, companies should stop creating new brands and product extensions. Better to consolidate product and service functions by following a four R approach: replace, repackage, reposition, and replenish. That's an outmoded, dictatorial view of markets, says Christopher Locke. Far from being stymied by choices, customers are rapidly becoming smarter than the companies that pretend to serve them. In this networked economy, people are talking among themselves, and that changes everything. Locke predicts we'll see a growing number of well-defined micromarkets--groups of customers converging in real time around entertaining and knowledgeable voices--such as NPR's car guys and the Motley Fool investment site. "Micromedia" Web sites will replace traditional advertising because they'll provide credible user-supplied news about products and services. Locke contends that an open exchange of information solves the "problem" of choice much better than manipulative strategies like simplicity or even permission marketing. Companies can participate in micromarkets through what Locke dubs "gonzo marketing." If Ford, for example, discovers that a subset of its employees are organic gardeners, it may offer support to a big independent organic-gardening Web site with donations and employee volunteers. This marketing effort would be driven not by advertising managers but by people with genuine interest in each micromarket, so it would have credibility with customers. With gonzo marketing, both companies and their markets will benefit.

  7. Company profile: Sistemic Ltd.

    PubMed

    Reid, Jim

    2013-09-01

    Founded in 2009 and headquartered in Glasgow, Scotland, UK, Sistemic Ltd has developed from a thought in the minds of four scientists into a company working globally to play its part in delivering the exciting opportunities for improvements in human health presented by cell therapies and regenerative medicine products (jointly referred to as the CT industry). Sistemic is now working in all corners of the world with some of the industry's leading companies to ensure that the products that they are developing, which will undoubtedly change the way we treat some of the major diseases and conditions currently placing a large burden on healthcare systems, including diabetes, dementia and cardiovascular disease, are as safe and efficacious as possible. Sistemic is also working to ensure that these products can be produced at a cost that will not lead to potentially transformational treatments being an additional financial burden on our already overburdened healthcare systems. Sistemic is using its revolutionary and IP-protected SistemQC™ (UK) technology to enhance understanding of characterization, process optimization and potency of CT products. The company is using the diagnostic power of miRNAs, a set of approximately 2000 ncRNAs that regulate a large percentage of the total gene expression of a cell. miRNAs are often present in a cell- and tissue-specific way that, at least in some cases, accounts for the phenotypic differences between cell types. These differences in miRNA expression can be interpreted by the miRNA profile and it is interpreting the instructive power of these profiles that underpin Sistemic's knowledge bases, giving CT companies a more comprehensive understanding of their cell populations with respect to their identity and functional capabilities. This knowledge is being used by companies to characterize, process, optimize and assess the efficacy of cell products.

  8. From Edison to Enron

    SciTech Connect

    Munson, Richard

    2005-11-01

    Kenneth Lay's secret partnerships and deceitful accounting certainly hurt Enron's investors, customers, and employees and tarnished his reputation, even if he's not found guilty of any crime when he goes to trial in January. Yet like Samuel Insull a century before him, Lay's trial probably won't stop the revolution he advanced within the power industry.

  9. Smart customers, dumb companies.

    PubMed

    Locke, C

    2000-01-01

    Customers today are being bombarded with an overwhelming array of choices. To alleviate customer frustration, say Steven Cristol and Peter Sealey in Simplicity Marketing, companies should stop creating new brands and product extensions. Better to consolidate product and service functions by following a four R approach: replace, repackage, reposition, and replenish. That's an outmoded, dictatorial view of markets, says Christopher Locke. Far from being stymied by choices, customers are rapidly becoming smarter than the companies that pretend to serve them. In this networked economy, people are talking among themselves, and that changes everything. Locke predicts we'll see a growing number of well-defined micromarkets--groups of customers converging in real time around entertaining and knowledgeable voices--such as NPR's car guys and the Motley Fool investment site. "Micromedia" Web sites will replace traditional advertising because they'll provide credible user-supplied news about products and services. Locke contends that an open exchange of information solves the "problem" of choice much better than manipulative strategies like simplicity or even permission marketing. Companies can participate in micromarkets through what Locke dubs "gonzo marketing." If Ford, for example, discovers that a subset of its employees are organic gardeners, it may offer support to a big independent organic-gardening Web site with donations and employee volunteers. This marketing effort would be driven not by advertising managers but by people with genuine interest in each micromarket, so it would have credibility with customers. With gonzo marketing, both companies and their markets will benefit. PMID:11184973

  10. Better Plants Program Overview

    SciTech Connect

    2015-09-30

    The U.S. Department of Energy’s (DOE’s) Better Buildings, Better Plants Program is a voluntary partnership initiative to drive significant energy efficiency improvement across energy intensive companies and organizations. 157 leading manufacturers and public water and wastewater treatment utilities are partnering with DOE through Better Plants to improve energy efficiency, slash carbon emissions, and cut energy costs.

  11. Multilingualism in Companies: An Introduction

    ERIC Educational Resources Information Center

    Sherman, Tamah; Strubell, Miquel

    2013-01-01

    This thematic collection of four papers explores a number of perspectives on companies in which multiple languages are used. The "organisational" perspective concerns the question of how the presence of or demand for multiple languages in the company is managed--how companies are guided by national and other policies in regard to the use…

  12. "Life without nuclear power": A nuclear plant retirement formulation model and guide based on economics. San Onofre Nuclear Generating Station case: Economic impacts and reliability considerations leading to plant retirement

    NASA Astrophysics Data System (ADS)

    Wasko, Frank

    Traditionally, electric utilities have been slow to change and very bureaucratic in nature. This culture, in and of itself, has now contributed to a high percentage of United States electric utilities operating uneconomical nuclear plants (Crooks, 2014). The economic picture behind owning and operating United States nuclear plants is less than favorable for many reasons including rising fuel, capital and operating costs (EUCG, 2012). This doctoral dissertation is specifically focused on life without nuclear power. The purpose of this dissertation is to create a model and guide that will provide electric utilities who currently operate or will operate uneconomical nuclear plants the opportunity to economically assess whether or not their nuclear plant should be retired. This economic assessment and stakeholder analysis will provide local government, academia and communities the opportunity to understand how Southern California Edison (SCE) embraced system upgrade import and "voltage support" opportunities to replace "base load" generation from San Onofre Nuclear Generating Station (SONGS) versus building new replacement generation facilities. This model and guide will help eliminate the need to build large replacement generation units as demonstrated in the SONGS case analysis. The application of The Nuclear Power Retirement Model and Guide will provide electric utilities with economic assessment parameters and an evaluation assessment progression needed to better evaluate when an uneconomical nuclear plant should be retired. It will provide electric utilities the opportunity to utilize sound policy, planning and development skill sets when making this difficult decision. There are currently 62 nuclear power plants (with 100 nuclear reactors) operating in the United States (EIA, 2014). From this group, 38 are at risk of early retirement based on the work of Cooper (2013). As demonstrated in my model, 35 of the 38 nuclear power plants qualify to move to the economic

  13. Review of current Southern California edison load management programs and proposal for a new market-driven, mass-market, demand-response program

    SciTech Connect

    Weller, G.H.

    2002-01-01

    Utility load management programs, including direct load control and interruptible load programs, constitute a large installed base of controllable loads that are employed by utilities as system reliability resources. In response to energy supply shortfalls expected during the summer of 2001, the California Public Utilities Commission in spring 2001 authorized new utility load management programs as well as revisions to existing programs. This report provides an independent review of the designs of these new programs for a large utility (Southern California Edison) and suggests possible improvements to enhance the price responsiveness of the customer actions influenced by these programs. The report also proposes a new program to elicit a mass-market demand response to utility price signals.

  14. Southern company energy storage study :

    SciTech Connect

    Ellison, James; Bhatnagar, Dhruv; Black, Clifton; Jenkins, Kip

    2013-03-01

    This study evaluates the business case for additional bulk electric energy storage in the Southern Company service territory for the year 2020. The model was used to examine how system operations are likely to change as additional storage is added. The storage resources were allowed to provide energy time shift, regulation reserve, and spinning reserve services. Several storage facilities, including pumped hydroelectric systems, flywheels, and bulk-scale batteries, were considered. These scenarios were tested against a range of sensitivities: three different natural gas price assumptions, a 15% decrease in coal-fired generation capacity, and a high renewable penetration (10% of total generation from wind energy). Only in the elevated natural gas price sensitivities did some of the additional bulk-scale storage projects appear justifiable on the basis of projected production cost savings. Enabling existing peak shaving hydroelectric plants to provide regulation and spinning reserve, however, is likely to provide savings that justify the project cost even at anticipated natural gas price levels. Transmission and distribution applications of storage were not examined in this study. Allowing new storage facilities to serve both bulk grid and transmission/distribution-level needs may provide for increased benefit streams, and thus make a stronger business case for additional storage.

  15. 40. Photocopy of a photographca. 1925 ISLAND PLANT: INTERIOR OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    40. Photocopy of a photograph--ca. 1925 ISLAND PLANT: INTERIOR OF GENERATING PLANT - American Falls Water, Power & Light Company, Island Power Plant, Snake River, below American Falls Dam, American Falls, Power County, ID

  16. GENERAL VIEW OF WESTERN PART OF PLANT INCLUDING (LEFT TO ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    GENERAL VIEW OF WESTERN PART OF PLANT INCLUDING (LEFT TO RIGHT) BETHLEHEM RAIL MILL, GENERAL OFFICE BUILDING, MACHINE SHOP, BAR MILL, BLOOMING MILL & OPEN HEARTH PLANT. - Pittsburgh Steel Company, Monessen Works, Open Hearth Plant, Donner Avenue, Monessen, Westmoreland County, PA

  17. Prep plant population rebounds

    SciTech Connect

    Fiscor, S.

    2005-10-01

    Demand and higher prices allows more operators to build and upgrade plants. The 2005 US Prep Plant Census found that the number of coal preparation plants has grown from 212 to 265 in five years - a 53 plant gain or a 20% increase over that reported by Coal Age in 2000. The number of bituminous coal washing facilities grew by 43 to 250. The article discusses the survey and the companies involved and presents a table giving key details of plants arranged by state. 6 tabs.

  18. 76 FR 1666 - Susquehanna Union Railroad Company-Control Exemption-North Shore Railroad Company, Nittany & Bald...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-11

    ... Company, Nittany & Bald Eagle Railroad Company, Shamokin Valley Railroad Company, Juniata Valley Railroad... Class III railroads: North Shore Railroad Company, Nittany & Bald Eagle Railroad Company,...

  19. Company profile: Aviir, Inc.

    PubMed

    Beggs, Michael; Biggs, William H; French, Cynthia

    2013-02-01

    Aviir, Inc. is a venture-funded biotechnology company developing and commercializing laboratory tests to provide personalized information to physicians and patients, with the goal of preventing cardiovascular disease and metabolic syndromes. Leveraging advanced research, Aviir developed and launched MIRISK VP™, a risk assessment test to better identify individuals at risk of a heart attack. Aviir also offers an extensive menu of other cardiovascular and metabolic tests through its Clinical Laboratory Improvement Amendments (CLIA)-certified laboratory. Efforts are likewise focused on expanding genomics testing capability to address sudden cardiac death attributed to inherited cardiovascular diseases. This completes their integrated precision diagnostics approach that combines biomarker immunoassays with genomic and transcription analysis, along with core clinical chemistry to deliver a comprehensive personal health solution.

  20. Health care automation companies.

    PubMed

    1995-12-01

    Health care automation companies: card transaction processing/EFT/EDI-capable banks; claims auditing/analysis; claims processors/clearinghouses; coding products/services; computer hardware; computer networking/LAN/WAN; consultants; data processing/outsourcing; digital dictation/transcription; document imaging/optical disk storage; executive information systems; health information networks; hospital/health care information systems; interface engines; laboratory information systems; managed care information systems; patient identification/credit cards; pharmacy information systems; POS terminals; radiology information systems; software--claims related/computer-based patient records/home health care/materials management/supply ordering/physician practice management/translation/utilization review/outcomes; telecommunications products/services; telemedicine/teleradiology; value-added networks. PMID:10153839

  1. Health care automation companies.

    PubMed

    1995-12-01

    Health care automation companies: card transaction processing/EFT/EDI-capable banks; claims auditing/analysis; claims processors/clearinghouses; coding products/services; computer hardware; computer networking/LAN/WAN; consultants; data processing/outsourcing; digital dictation/transcription; document imaging/optical disk storage; executive information systems; health information networks; hospital/health care information systems; interface engines; laboratory information systems; managed care information systems; patient identification/credit cards; pharmacy information systems; POS terminals; radiology information systems; software--claims related/computer-based patient records/home health care/materials management/supply ordering/physician practice management/translation/utilization review/outcomes; telecommunications products/services; telemedicine/teleradiology; value-added networks.

  2. Advanced dimensional inspection for the reverse engineering of power plant equipment

    SciTech Connect

    Kotteakos, B.; Ball, K.A.

    1996-12-31

    Forced outages and critical path situations often leave electric utilities with very few options other than the OEM. What does the utility do when faced with the situation of long lead time or obsolete items necessary to bring units back on-line, or off load restrictions. At Southern California Edison Company (SCE), a proactive approach to the reverse engineering and inspection process was undertaken to reduce the effects of similar situations. Advances in dimensional measurement technology have afforded the authors` company a cost effective method for obtaining the necessary inspection data to remanufacture certain items. This paper identifies equipment utilized by SCE for the reverse engineering and inspection of turbine and turbine related components and their typical applications in the power generation industry.

  3. Pharmacy benefit management companies.

    PubMed

    Taniguchi, R

    1995-09-01

    The principal services offered by pharmacy benefit management companies (PBMs) are described. A PBM contracts with employers, insurers, and others to provide accessible and cost-effective benefits to those groups' members. PBMs vary in their organization and services because they originate from different types of businesses. Many PBMs have been formed by publicly traded companies that have combined traditional ways of controlling cost and use, such as formularies, with new elements to form organizations whose primary function is managing the pharmacy benefit. Often, the PBM is paid a fixed amount for which it must provide all contracted services. PBMs may provide pharmacy services themselves (e.g., mail order prescription service is offered by Medco, one of the largest PBMs); more often, they subcontract with others to provide certain services. Full-service PBMs have the following functions: establishing networks of pharmacies for use by plan members; processing claims electronically at the time a prescription is filled and thus maintaining a database on drug use and cost; using these data to generate various reports; encouraging the use of generic products; managing existing formularies, helping to establish customized formularies, or providing a national formulary; providing information to support formulary guidelines (counter-detailing); offering programs in which prescriptions for maintenance medications are filled less frequently with larger amounts, often by mail order; negotiating volume-based rebates from manufacturers; performing drug-use review; developing disease management programs based on clinical practice guidelines and measurements of patient outcome; and evaluating outcomes by combining data on drug therapy with information about other parts of the patient's care.(ABSTRACT TRUNCATED AT 250 WORDS)

  4. 17 CFR 256.01-2 - Application to service companies doing business with nonassociate companies.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... companies doing business with nonassociate companies. 256.01-2 Section 256.01-2 Commodity and Securities... COMPANIES AND SUBSIDIARY SERVICE COMPANIES, PUBLIC UTILITY HOLDING COMPANY ACT OF 1935 General Instructions § 256.01-2 Application to service companies doing business with nonassociate companies. While...

  5. 40. Topeka and Santa Fe Railway Company, Los Angeles, California, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    40. Topeka and Santa Fe Railway Company, Los Angeles, California, dated July 1937. (Microfiched drawings located at the Denver Service Center, #113/41906-set of 2) IMPROVEMENTS IN SEWAGE TREATMENT AND FILTER CHAMBER. - Water Reclamation Plant, Grand Canyon, Coconino County, AZ

  6. VIEW OF PELTON WATER WHEEL COMPANY (SAN FRANCISCO) TURBINE: SPEED ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW OF PELTON WATER WHEEL COMPANY (SAN FRANCISCO) TURBINE: SPEED 225 RPM, 17,500 HP. PHOTO BY JET LOWE, HAER, 1995. (Note: the dark hole in the concrete column to the left is from a tear in the negative.) - Elwha River Hydroelectric System, Glines Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA

  7. 55. SHELL OIL COMPANY FACILITIES (LEFT AND CENTER) AND CHEMICAL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    55. SHELL OIL COMPANY FACILITIES (LEFT AND CENTER) AND CHEMICAL STORAGE TANKS (RIGHT) AT NORTH EDGE OF SOUTH PLANT. VIEW TO WEST. - Rocky Mountain Arsenal, Bounded by Ninety-sixth Avenue & Fifty-sixth Avenue, Buckley Road, Quebec Street & Colorado Highway 2, Commerce City, Adams County, CO

  8. 45. FIRST FLOOR BLDG. 4, DETAIL "BIGELOW COMPANY" BOILER LOOKING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    45. FIRST FLOOR BLDG. 4, DETAIL "BIGELOW COMPANY" BOILER LOOKING NORTH. - Fafnir Bearing Plant, Bounded on North side by Myrtle Street, on South side by Orange Street, on East side by Booth Street & on West side by Grove Street, New Britain, Hartford County, CT

  9. 75 FR 77677 - Southern Nuclear Operating Company, Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-13

    ... exemption will not have a significant effect on the quality of the human environment (75 FR 69137; November... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Southern Nuclear Operating Company, Inc. Edwin I Hatch Nuclear Plant, Unit No. 2; Exemption...

  10. A strategy for company improvement.

    PubMed

    Howley, L

    2000-03-01

    Strategies based on the kaizen methodology are designed to continuously improve company performance without the need for large capital investments. This article looks at how one company used simple kaizen principles to its advantage, achieving 67% increase in productivity and 10% reduction in the standard cost of product.

  11. Assessing Your Company's Training Needs.

    ERIC Educational Resources Information Center

    Food, Drink and Tobacco Industry Training Board, Croydon (England).

    This book was designed to serve as a guide for the small and medium-sized firm establishing a systematic training pattern for the first time, and to the larger company for whom it will act as a useful check list. The guide examines the kind of information required and the ways in which actual companies have arrived at their training requirements…

  12. 2. Photocopy of photograph, c. 1904. VIEW OF TAILRACE ELEVATION ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. Photocopy of photograph, c. 1904. VIEW OF TAILRACE ELEVATION OF ORIGINAL MARTINSBURG POWER COMPANY POWER HOUSE AT DAM NO. 5. (Courtesy of the Potomac Edison Company Library, Historical Data Files, Dam No. 5 listing) - Dam No. 5 Hydroelectric Plant, On Potomac River, Hedgesville, Berkeley County, WV

  13. Technical evaluation report on the Third 10-year Interval Inservice Inspection Program Plan: Florida Power and Light Company, Turkey Point Nuclear Power Plant, Units 3 and 4 (Docket Numbers 50-250 and 50-251)

    SciTech Connect

    Brown, B.W.; Feige, E.J.; Galbraith, S.G.; Porter, A.M.

    1995-02-01

    This report presents the results of the evaluation of the Turkey Point Nuclear Power Plant, Units 3 and 4, Third 10-Year Interval Inservice Inspection Program Plan, Revision 0, submitted September 9, 1993, including the requests for relief from the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section XI, requirements that the licensee has determined to be impractical. The Turkey Point Nuclear Power Plant, Units 3 and 4, Third 10-Year Interval Inservice Inspection Program Plan is evaluated in Section 2 of this report. The inservice inspection (ISI) program plan is evaluated for (a) compliance with the appropriate edition/addenda of Section XI, (b) acceptability of the examination sample, (c) correctness of the application of system or component examination exclusion criteria, and (d) compliance with ISI-related commitments identified during previous Nuclear Regulatory Commission (NRC) reviews. The requests for relief are evaluated in Section 3 of this report.

  14. New security measures are proposed for N-plants: Insider Rule package is issued by NRC

    SciTech Connect

    Not Available

    1984-09-01

    New rules proposed by the Nuclear Regulatory Commission (NRC) will require background investigations and psychological assessments of new job candidates and continual monitoring of the behavior of all power plant workers with access to sensitive areas. Licensees will have to submit an ''access authorization'' program for approval describing how they will conduct these security activities. The employee checks will go back five years to examine credit, educational, and criminal histories. Implementation of the rules could involve the Edison Electric Institute as an intermediary to funnel criminal checks from the Justice Department and FBI. The NRC is also considering a clarification of areas designated as ''vital'' because current designations may be too strict.

  15. HMGB1 loves company.

    PubMed

    Bianchi, Marco E

    2009-09-01

    HMGB1, outside of a cell, is a trigger of inflammation and a stimulus for tissue reconstruction; the balance may depend on the complexes it forms with other molecules. HMGB1 is the prime example of a danger signal that originates from the damaged self rather than from invading pathogens. HMGB1 is released by cells that die traumatically and is secreted by cells destined to die and by activated cells of the innate immunity system. As a danger signal, HMGB1 is expected to trigger inflammation, but recent reports indicate that pure recombinant HMGB1 has no proinflammatory activity and only acts as a chemoattractant and a mitogen. However, HMGB1 forms highly inflammatory complexes with ssDNA, LPS, IL-1beta, and nucleosomes, which interact with TLR9, TLR4, IL-1R, and TLR2 receptors, respectively. Thus, HMGB1 has dual activities, solo or in company; I speculate that this may serve our body's necessity to sacrifice or reconstruct tissues as required by the presence or absence of pathogens.

  16. 47 CFR 32.2006 - Nonoperating plant.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 2 2013-10-01 2013-10-01 false Nonoperating plant. 32.2006 Section 32.2006... FOR TELECOMMUNICATIONS COMPANIES Instructions for Balance Sheet Accounts § 32.2006 Nonoperating plant... in the plant accounts as operating telecommunications plant. It shall include the...

  17. 47 CFR 32.2006 - Nonoperating plant.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 2 2014-10-01 2014-10-01 false Nonoperating plant. 32.2006 Section 32.2006... FOR TELECOMMUNICATIONS COMPANIES Instructions for Balance Sheet Accounts § 32.2006 Nonoperating plant... in the plant accounts as operating telecommunications plant. It shall include the...

  18. 47 CFR 32.2006 - Nonoperating plant.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 2 2012-10-01 2012-10-01 false Nonoperating plant. 32.2006 Section 32.2006... FOR TELECOMMUNICATIONS COMPANIES Instructions for Balance Sheet Accounts § 32.2006 Nonoperating plant... in the plant accounts as operating telecommunications plant. It shall include the...

  19. 47 CFR 32.2006 - Nonoperating plant.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Nonoperating plant. 32.2006 Section 32.2006... FOR TELECOMMUNICATIONS COMPANIES Instructions for Balance Sheet Accounts § 32.2006 Nonoperating plant... in the plant accounts as operating telecommunications plant. It shall include the...

  20. 47 CFR 32.2006 - Nonoperating plant.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 2 2011-10-01 2011-10-01 false Nonoperating plant. 32.2006 Section 32.2006... FOR TELECOMMUNICATIONS COMPANIES Instructions for Balance Sheet Accounts § 32.2006 Nonoperating plant... in the plant accounts as operating telecommunications plant. It shall include the...

  1. 76 FR 38382 - Public Service Company of Colorado; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-30

    ... Energy Regulatory Commission Public Service Company of Colorado; Notice of Filing Take notice that on June 6, 2011, Public Service Company of Colorado (PSCo) submitted a filing seeking approval of proposed... in Account 101, Electric Plant in Service. Any person desiring to intervene or to protest this...

  2. 78 FR 23738 - Monsanto Company and Forage Genetics International (FGI); Availability of Petition for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-22

    ... status. On March 6, 2012, we published in the Federal Register (77 FR 13258-13260, Docket No. APHIS-2011... Animal and Plant Health Inspection Service Monsanto Company and Forage Genetics International (FGI... Company and Forage Genetics International (FGI) seeking a determination of nonregulated status of...

  3. 25. Site plan by New Haven Water Company, c.1900 Photocopied ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    25. Site plan by New Haven Water Company, c.1900 Photocopied from property map, Mill River Division, Sheet 51, Map Collection, Armory Street Filtration Plant, New Haven Water Company, Hamden, Connecticut. - Eli Whitney Armory, West of Whitney Avenue, Armory Street Vicinity, Hamden, New Haven County, CT

  4. US prep plant census 2008

    SciTech Connect

    Fiscor, S.

    2008-10-15

    Each year Coal Age conducts a fairly comprehensive survey of the industry to produce the US coal preparation plant survey. This year's survey shows how many mergers and acquisitions have given coal operators more coal washing capacity. The plants are tabulated by state, giving basic details including company owner, plant name, raw feed, product ash %, quality, type of plant builder and year built. 1 tab., 1 photo.

  5. 12 CFR 583.6 - Company.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Company. 583.6 Section 583.6 Banks and Banking... AND LOAN HOLDING COMPANIES § 583.6 Company. The term company means any corporation, partnership, trust, joint-stock company, or similar organization, but does not include: (a) The Federal Deposit...

  6. 77 FR 33004 - Exelon Generation Company, LLC; Clinton Power Station, Unit 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-04

    ... COMMISSION Exelon Generation Company, LLC; Clinton Power Station, Unit 1 AGENCY: Nuclear Regulatory... Manager, Plant Licensing Branch III-2, Division of Operating Reactor Licensing, Office of Nuclear Reactor... Licensing, Office of Nuclear Reactor Regulation. BILLING CODE 7590-01-P...

  7. Experiences with drug testing at a nuclear power plant

    SciTech Connect

    Ray, H.B.

    1987-01-01

    After more than 2 yr of operation of a drug testing program at the San Onofre nuclear power plant site, the Southern California Edison Co. has had a number of experiences and lessons considered valuable. The drug testing program at San Onofre, implemented in September of 1984, continues in essentially the same form today. Prior to describing the program, the paper reviews several underlying issues that believed to be simultaneously satisfied by the program: trustworthiness, fitness and safety, public trust, and privacy and search. The overall drug testing program, periodic drug monitoring program, and unannounced drug testing program are described. In addition to the obvious features of a good drug testing program, which are described in the EEI guide, it is essential to consider such issues as the stated program rationale, employee relations, and disciplinary action measures when contemplating or engaging in drug testing at nuclear power plants.

  8. Westchester to get garbage-fired power plant

    SciTech Connect

    Not Available

    1981-06-29

    A $165 million plant to convert 657,000 tons of municipal refuse yearly to 47 MW of electricity will be built at Peekbhill, Westchester County, New York. The plant will be the largest of its kind in the U.S. when completed in late 1984. Wheelabrator-Frye will put up $47 million of the cost, the rest will come from industrial development bonds. $15 per ton will be paid to the firm by the 34 municipalities to take the refuse, with the county's Special Refuse Disposal District paying up to $12 per ton more until the venture is profitable. Consolidated Edison Co. and the city of Peekskill are negotiating to buy the electricity.

  9. 77 FR 66607 - Sierra Pacific Power Company, Nevada Power Company; Notice of Petition for Declaratory Order

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-06

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Sierra Pacific Power Company, Nevada Power Company; Notice of... Pacific Power Company and Nevada Power Company (Applicants) filed a petition for declaratory...

  10. Plant life management

    SciTech Connect

    Charbonneau, S.; Framatome, J.B. )

    1992-01-01

    Plant life assessment and extension studies have been performed by numerous companies all over the world. Critical equipment has been identified as well as various degradation mechanisms involved in the plant aging process. Nowadays one has to think what to implement to improve the existing situation in the Nuclear Power Plant (NPP). FRAMATOME has undertaken this thought process in order to find the right answers and bring them to utilities facing either critical concern for plant life extension or the problem of management of power plant potential longevity. This is why we prepared a Plant Life Improvement Action Plan, comprising 10 (ten) major items described hereafter using examples of work performed by FRAMATOME for its utility customers desiring to manage the lives of their plants, both in France with EDF and abroad.

  11. 12 CFR 225.102 - Bank holding company indirectly owning nonbanking company through subsidiaries.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... CONTROL (REGULATION Y) Regulations Financial Holding Companies Interpretations § 225.102 Bank holding... Act of 1956. It is stated that Y Company is an investment company which is not a bank holding company... holding company. It is stated that direct ownership by X Corporation of voting shares of Y Company...

  12. Eastern Kodak Company

    SciTech Connect

    Y.S. Tyan

    2009-06-30

    Lighting consumes more than 20% of electricity generated in the United States. Solid state lighting relies upon either inorganic or organic light-emitting diodes (OLEDs). OLED devices because of their thinness, fast response, excellent color, and efficiency could become the technology of choice for future lighting applications, provided progress is made to increase power efficiency and device lifetime and to develop cost-effective manufacturing processes. As a first step in this process, Eastman Kodak Company has demonstrated an OLED device architecture having an efficacy over 50 lm/W that exceeds the specifications of DOE Energy Star Program Requirements for Solid State Lighting. The project included work designed to optimize an OLED device, based on a stacked-OLED structure, with performance parameters of: low voltage; improved light extraction efficiency; improved internal quantum efficiency; and acceptable lifetime. The stated goal for the end of the project was delivery of an OLED device architecture, suitable for development into successful commercial products, having over 50 lum/W power efficiency and 10,000 hours lifetime at 1000 cd/m{sup 2}. During the project, Kodak developed and tested a tandem hybrid IES device made with a fluorescent blue emitter, a phosphorescent yellow emitter, and a phosphorescent red emitter in a stacked structure. The challenge was to find low voltage materials that do not absorb excessive amounts of emitted light when the extraction enhancement structure is applied. Because an extraction enhancement structure forces the emitted light to travel several times through the OLED layers before it is emitted, it exacerbates the absorption loss. A variety of ETL and HTL materials was investigated for application in the low voltage SSL device structure. Several of the materials were found to successfully yield low operating device voltages without incurring excessive absorption loss when the extraction enhancement structure was applied

  13. The Overnight Scentsation Rose Plant

    NASA Technical Reports Server (NTRS)

    1998-01-01

    International Flavors and Fragrances Inc., is a company that creates and manufactures flavors, fragrances and aroma chemicals. The Overnight Scentsation rose plant will be housed aboard NASA's shuttle flight STS-95 in a specially-designed structure under ultraviolet lights. The flowering plant was brought to Cape Canaveral from its home at IFF's greenhouse in Union Beach, New Jersey.

  14. [INDENA SPA company's patent portfolio of Ginkgo biloba preparation].

    PubMed

    Wang, Nan; Guo, Kai; Cheng, Xin-min; Liu, Wei

    2015-10-01

    INDENA SPA Company in Italy is a multi-national company that produces and sells plant extracts. Based on its own re- search advantages in the field of Ginkgo biloba preparation, the company protects its own products market effectively through building patent portfolio around the patents of its opponent. Based on the multi-angle analysis for patent portfolio of G. biloba preparation from the aspects of application time, legal status, technical development route, and patent portfolio layout, this article provides technical reference on research and development of G. biloba preparation, and the author suggest that Chinese applicants learn techniques and layout experiences of other patents fully to enhance the level of research and patent protection level. PMID:26975120

  15. [INDENA SPA company's patent portfolio of Ginkgo biloba preparation].

    PubMed

    Wang, Nan; Guo, Kai; Cheng, Xin-min; Liu, Wei

    2015-10-01

    INDENA SPA Company in Italy is a multi-national company that produces and sells plant extracts. Based on its own re- search advantages in the field of Ginkgo biloba preparation, the company protects its own products market effectively through building patent portfolio around the patents of its opponent. Based on the multi-angle analysis for patent portfolio of G. biloba preparation from the aspects of application time, legal status, technical development route, and patent portfolio layout, this article provides technical reference on research and development of G. biloba preparation, and the author suggest that Chinese applicants learn techniques and layout experiences of other patents fully to enhance the level of research and patent protection level.

  16. 12 CFR 583.15 - Parent company.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Parent company. 583.15 Section 583.15 Banks and Banking OFFICE OF THRIFT SUPERVISION, DEPARTMENT OF THE TREASURY DEFINITIONS FOR REGULATIONS AFFECTING SAVINGS AND LOAN HOLDING COMPANIES § 583.15 Parent company. The term parent company means any...

  17. How to Analyze Company Using Social Network?

    NASA Astrophysics Data System (ADS)

    Palus, Sebastian; Bródka, Piotr; Kazienko, Przemysław

    Every single company or institution wants to utilize its resources in the most efficient way. In order to do so they have to be have good structure. The new way to analyze company structure by utilizing existing within company natural social network and example of its usage on Enron company are presented in this paper.

  18. Four state companies are markedly different

    SciTech Connect

    Aalund, L.R.

    1995-08-21

    The Journal continues its profiles of state owned oil companies with a return to the Persian Gulf, South America, and a first time look at the state oil company of Romania, one of Eastern Europe`s most active and oldest producers. The government of Kazakhstan`s activities are also covered in this report. These profiles detail the organization of the companies, with emphasis on upstream and downstream operations. Support functions, though essential to a company, are not covered in detail. Company projects and capabilities are only described in this report when necessary to put the company in perspective. Following are the profiles of state companies for Bahrain, Kuwait, Romania, and Venezuela.

  19. Planting Seeds, Growing Diversity

    ERIC Educational Resources Information Center

    Hua, Vanessa

    2011-01-01

    Last year, when students at Ridgecrest Intermediate School in Palos Verdes, California, were asked to name scientists, their answers--Benjamin Franklin, Thomas Edison, Albert Einstein, Bill Nye the Science Guy--reflected a common perception. Most of the leading scientists they came up with were white, male, or dead. Although women and people of…

  20. 7. INTERIOR DETAIL OF CRUSHING PLANT (FEATURE 19), GROUND LEVEL, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. INTERIOR DETAIL OF CRUSHING PLANT (FEATURE 19), GROUND LEVEL, FACING NORTH. REMAINS OF CONVEYOR BELT VISIBLE AT BOTTOM RIGHT. - Copper Canyon Camp of the International Smelting & Refining Company, Crushing Plant, Copper Canyon, Battle Mountain, Lander County, NV

  1. 2. View of Liquified Propane Air Plant (New), former Exhaust ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. View of Liquified Propane Air Plant (New), former Exhaust and Compressor Building and former Purifying Plant in background. - Concord Gas Light Company, South Main Street, Concord, Merrimack County, NH

  2. 10. SOUTHEAST CORNER OF PLANT, LOOKING NORTH ALONG DIKE. NOTE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. SOUTHEAST CORNER OF PLANT, LOOKING NORTH ALONG DIKE. NOTE OIL HOUSE FOUNDATIONS AT LOWER LEFT. - Ford Motor Company Long Beach Assembly Plant, Assembly Building, 700 Henry Ford Avenue, Long Beach, Los Angeles County, CA

  3. GENERAL VIEW OF BATCH PLANT, CONVEYOR AND GLASS FURNACE STACK ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    GENERAL VIEW OF BATCH PLANT, CONVEYOR AND GLASS FURNACE STACK LOOKING NORTHEAST FROM DREY STREET - Chambers Window Glass Company, Batch Plant, North of Drey (Nineteenth) Street, West of Constitution Boulevard, Arnold, Westmoreland County, PA

  4. GENERAL VIEW OF WAREHOUSE ADJACENT TO BATCH PLANT, LOOKING NORTHWEST ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    GENERAL VIEW OF WAREHOUSE ADJACENT TO BATCH PLANT, LOOKING NORTHWEST FROM DREY STREET PLANT, INSIDE WELCOME WALL - Chambers Window Glass Company, Warehouse & Shipping, North of Drey (Nineteenth) Street, West of Constitution Boulevard, Arnold, Westmoreland County, PA

  5. DETAIL VIEW OF BATCH BIN AFTER PLANT DEMOLITION, LOOKING EAST ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    DETAIL VIEW OF BATCH BIN AFTER PLANT DEMOLITION, LOOKING EAST TOWARD ARNOLD - Chambers Window Glass Company, Batch Plant, North of Drey (Nineteenth) Street, West of Constitution Boulevard, Arnold, Westmoreland County, PA

  6. CALCIUM CHLORIDE PLANT LOOKING EAST. CALCIUM CHLORIDE BUILDING IN CENTER, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    CALCIUM CHLORIDE PLANT LOOKING EAST. CALCIUM CHLORIDE BUILDING IN CENTER, CALCIUM CHLORIDE STORAGE BUILDING ON RIGHT WITH SA (SODA ASH) BUILDING IN RIGHT BACKGROUND. - Solvay Process Company, Calcium Chloride Plant, Between Willis & Milton Avenues, Solvay, Onondaga County, NY

  7. 9. GENERAL VIEW OF ISLAND PLANT LOOKING NORTH (negative reversed) ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. GENERAL VIEW OF ISLAND PLANT LOOKING NORTH (negative reversed) - American Falls Water, Power & Light Company, Island Power Plant, Snake River, below American Falls Dam, American Falls, Power County, ID

  8. 53. EASTSIDE PLANT: GENERAL VIEW OF GENERATOR, EXCITER, GOVERNOR, AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    53. EASTSIDE PLANT: GENERAL VIEW OF GENERATOR, EXCITER, GOVERNOR, AND CONTROL MECHANISM - American Falls Water, Power & Light Company, Island Power Plant, Snake River, below American Falls Dam, American Falls, Power County, ID

  9. 50. EASTSIDE PLANT: GENERAL VIEW OF GENERATOR EXCITER AND CONTROL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    50. EASTSIDE PLANT: GENERAL VIEW OF GENERATOR EXCITER AND CONTROL MECHANISM - American Falls Water, Power & Light Company, Island Power Plant, Snake River, below American Falls Dam, American Falls, Power County, ID

  10. 37. ISLAND PLANT: Nos. 1 AND 2 TWENTYSIX INCH SPECIAL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    37. ISLAND PLANT: Nos. 1 AND 2 TWENTY-SIX INCH SPECIAL HORIZONTAL SAMSON TURBINE (RIVITED CASE) - American Falls Water, Power & Light Company, Island Power Plant, Snake River, below American Falls Dam, American Falls, Power County, ID

  11. 29. ISLAND PLANT: INTERIOR VIEW LOOKING SOUTHWEST ON GROUND FLOOR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    29. ISLAND PLANT: INTERIOR VIEW LOOKING SOUTHWEST ON GROUND FLOOR - American Falls Water, Power & Light Company, Island Power Plant, Snake River, below American Falls Dam, American Falls, Power County, ID

  12. 7. ISLAND PLANT AND HORSESHOE DAM FROM WEST BANK (negative ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. ISLAND PLANT AND HORSESHOE DAM FROM WEST BANK (negative reversed) - American Falls Water, Power & Light Company, Island Power Plant, Snake River, below American Falls Dam, American Falls, Power County, ID

  13. 52. EASTSIDE PLANT: GENERAL VIEW OF GOVERNOR ADJACENT TO GENERATOR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    52. EASTSIDE PLANT: GENERAL VIEW OF GOVERNOR ADJACENT TO GENERATOR - American Falls Water, Power & Light Company, Island Power Plant, Snake River, below American Falls Dam, American Falls, Power County, ID

  14. 36. ISLAND PLANT: Nos. 1 AND 2 TWENTYSIX INCH HORIZONTAL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    36. ISLAND PLANT: Nos. 1 AND 2 TWENTY-SIX INCH HORIZONTAL SAMSON TURBINES - American Falls Water, Power & Light Company, Island Power Plant, Snake River, below American Falls Dam, American Falls, Power County, ID

  15. 17. Photocopy of a photograph1921 EASTSIDE PLANT LOOKING NORTHEAST ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. Photocopy of a photograph--1921 EASTSIDE PLANT LOOKING NORTHEAST - American Falls Water, Power & Light Company, Island Power Plant, Snake River, below American Falls Dam, American Falls, Power County, ID

  16. How risky is your company?

    PubMed

    Simons, R

    1999-01-01

    In boom times, it is easy for managers to forget about risk. And not just financial risk, but organizational and operational risk as well. Now there's the risk exposure calculator, a new tool that will help managers determine exactly where and how much internal risk is mounting in their companies. The risk calculator is divided into three parts: The first set of "keys" alerts managers to the pressures that come from growth. Now that the company has taken off, are employees feeling increased pressure to perform? Is the company's infrastructure becoming overloaded? And are more new employees coming on board as the company rushes to fill positions? If the answer is yes to any one of those questions, then risk may be rising to dangerous levels. The second set of keys on the calculator highlights pressures that arise from corporate culture. Are too many rewards being given for entrepreneurial risk taking? Are executives becoming so resistant to bad news that no one feels comfortable alerting them to problems? And is the company's level of internal competition so high that employees see promotion as a zero-sum game? The final set of pressures, the author says, revolves around information management. When calculating these pressures, managers should ask themselves, what was the company's complexity, volume, and velocity of information a year ago? Have they risen? By how much? How much of the time am I doing the work that a computer system should be doing? High pressure on many or all of these points should set off alarm bells for managers. To control risk, managers have four levers of control at their disposal that will show them where they need to make organizational adjustments. PMID:10387580

  17. Minnesota Mining and Manufacturing Company's hazardous waste program.

    PubMed

    Van Noordwyk, H J; Santoro, M A

    1978-12-01

    This paper discusses the present hazardous waste program of 3M Company (Minnesota Mining and Manufacturing Company). 3M's definition of hazardous waste and the company's position on hazardous waste disposal are first considered. The company position is that wherever and whenever the disposal of a waste material threatens the environment or public safety, then that waste should be considered a hazardous waste and treated accordingly in terms of its handling and ultimate disposal. The generation of hazardous wastes and the differentiation of "hazardous" and "nonhazardous" wastes are described next. Handling of hazardous wastes from their generation to their disposal is then covered. This includes a definition of internal 3M terminology and a description of the hazard rating system used by the company. Finally, 3M disposal practices are presented. It is 3M's position that thermal destruction of hazardous wastes, where appropriate, is the best method for their disposal. With this in mind, 3M has constructed incineration facilities throughout the country. The rotary kiln incinerator at the 3M Chemolite plant in Cottage Grove, Minnesota is briefly described. Disposal of certain hazardous wastes in controlled secure land disposal sites is then briefly discussed.

  18. Company strategies for using bioinformatics.

    PubMed

    Bains, W

    1996-08-01

    Bioinformatics enables biotechnology companies to access and analyse their growing databases of experimental results, and to exploit public data from genome programmes and other sources. Traditionally occupying the domain of a 'guru' supplying answers to infrequent research questions, corporate bioinformatics is breaking down under the flood of data. New, more robust, professional and expandable systems will give scientists effective access to new tools. This review outlines how companies have evolved beyond the 'guru', and have organized their bioinformatics by acquiring or developing bioinformatics resources. It also describes why the biologist must be central to this process, and why this is a problem for computer professionals to solve, not for 'gurus'.

  19. Starting a Small Instrument Company

    NASA Astrophysics Data System (ADS)

    Warburton, W. K.

    1997-03-01

    The author is now the owner of an 8 person company that develops specialized electronics to support the detectors used at synchrotron radiation facilities and is spinning this expertise off into developing spectrometry instruments for specialized medical markets. This talk will begin with a short history illustrating the random walk processes leading to the present situation and then consider some of the issues which a small company must deal with in order to survive. From this perspective, the author will then extract a list of steps the prospective physicist/entreprenuer can take, while still a student or post-doc, to prepare for success in growing a small business.

  20. 75 FR 14436 - Ameren Corporation, Illinois Power Company, Central Illinois Light Company, Central Illinois...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-25

    ... Energy Regulatory Commission Ameren Corporation, Illinois Power Company, Central Illinois Light Company, Central Illinois Public Service Company, Ameren Energy Resources Company, LLC, AmerenEnergy Resources Generating Company; Notice of Filing March 18, 2010. Take notice that on March 15, 2010, Ameren...

  1. 76 FR 55237 - Use of Derivatives by Investment Companies Under the Investment Company Act of 1940

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-07

    ...The Securities and Exchange Commission (the ``Commission'') and its staff are reviewing the use of derivatives by management investment companies registered under the Investment Company Act of 1940 (the ``Investment Company Act'' or ``Act'') and companies that have elected to be treated as business development companies (``BDCs'') under the Act (collectively, ``funds''). To assist in this......

  2. 78 FR 25486 - Luminant Generation Company, LLC., Combined License Application for Comanche Peak Nuclear Power...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-01

    ... of the Code of Federal Regulations (10 CFR), for the Comanche Peak Nuclear Power Plant (CPNPP), Units... Peak Nuclear Power Plant, Units 3 and 4,'' dated May 13, 2011. Agencies and Persons Consulted On March... COMMISSION Luminant Generation Company, LLC., Combined License Application for Comanche Peak Nuclear...

  3. 75 FR 28664 - Southern Nuclear Operating Company; Notice of Availability of Environmental Assessment and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-21

    ... Operating Company et al., for Vogtle Electric Generating Plant ESP Site Located in Burke County, GA AGENCY... Corporation, Municipal Electric Authority of Georgia, and the City of Dalton, Georgia), for the Vogtle Electric Generating Plant (VEGP) ESP site located in Burke County, Georgia. The proposed amendment...

  4. 75 FR 39284 - Southern Nuclear Operating Company et al.; Notice of Availability of Environmental Assessment and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-08

    ... Operating Company et al., for Vogtle Electric Generating Plant ESP Site Located In Burke County, GA AGENCY... Commission (NRC) is considering issuance of an amendment to Early Site Permit (ESP) No. ESP-004, issued on..., Georgia), for the Vogtle Electric Generating Plant (VEGP) ESP site located in Burke County, Georgia....

  5. 75 FR 49527 - General Motors Company Formerly Known as General Motors Corporation, Willow Run Transmission...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-13

    ... General Motors Company, formerly known as General Motors Corporation, Willow Run Transmission Plant, Ypsilanti, Michigan. The notice was published in the Federal Register on July 26, 2010. (75 FR 43558). At..., Willow Run Transmission Plant Including On-Site Leased Workers From Aerotek; Ypsilanti, MI;...

  6. In the Company of Teachers

    ERIC Educational Resources Information Center

    Wood, George

    2009-01-01

    Being in the company of teachers is at the heart of the Coalition. The center of Ted Sizer's work, of his life, of CES, is the life of the teacher. "Horace's Compromise," the first of Sizer's well known series about teachers and school change, imparted a sympathetic portrait of Horace Smith, a teacher trying to make a difference in a system…

  7. Natural gas annual 1993 supplement: Company profiles

    SciTech Connect

    Not Available

    1995-02-01

    The Natural Gas Annual provides information on the supply and disposition of natural gas to a wide audience including industry, consumers, Federal and State agencies, and educational institutions. This report, the Natural Gas Annual 1993 Supplement: Company Profiles, presents a detailed profile of 45 selected companies in the natural gas industry. The purpose of this report is to show the movement of natural gas through the various States served by the companies profiled. The companies in this report are interstate pipeline companies or local distribution companies (LDC`s). Interstate pipeline companies acquire gas supplies from company owned production, purchases from producers, and receipts for transportation for account of others. Pipeline systems, service area maps, company supply and disposition data are presented.

  8. Early warning indicators for monitoring nuclear plant performance

    SciTech Connect

    Acosta, R.J.

    1997-12-01

    Florida Power & Light Company`s (FP&L`s) Nuclear Division has developed a set of early warning indicators that are used to provide precursor indications of future plant performance. These indicators are monitored by management and safety committees to enable early detection of negative performance so that corrective actions may be taken prior to experiencing a significant decline in plant performance.

  9. 78 FR 43197 - Duke Energy Florida, Inc.; Florida Power & Light Company; Tampa Electric Company; Orlando...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-19

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Duke Energy Florida, Inc.; Florida Power & Light Company; Tampa Electric..., Duke Energy Florida, Inc., Florida Power & Light Company, Tampa Electric Company, and Orlando...

  10. Company Portfolios Answer the Question: What Do You Know about My Company?

    ERIC Educational Resources Information Center

    Watson, Michelle L.

    2001-01-01

    Job seekers can demonstrate their knowledge of a potential employer by developing a company portfolio. Elements include company history, mission, values, and goals; size and location(s); financial status; and recent changes in the company and industry. (SK)

  11. 77 FR 58124 - Hardins Manufacturing Company, Hardins Resources Company; Notice of Transfer of Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-19

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Hardins Manufacturing Company, Hardins Resources Company; Notice of Transfer of Exemption 1. By email filed April 23, 2012, Hardins Manufacturing Company informed the...

  12. 75 FR 61835 - Jackson & Lansing Railroad Company-Trackage Rights Exemption-Norfolk Southern Railway Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-06

    ... Surface Transportation Board Jackson & Lansing Railroad Company--Trackage Rights Exemption-- Norfolk Southern Railway Company Pursuant to a written Assignment of Trackage Rights and Other Joint Facility Agreements (Trackage Agreement) dated September 16, 2010, Norfolk Southern Railway Company (NSR) has...

  13. Thermal treatment effectively controls zebra mussels at Illinois power plants

    SciTech Connect

    Marcus, R.I. ); Wahlert, S.L. )

    1994-12-01

    This article describes how a Commonwealth Edison Co. (ComEd) task force finds thermal treatment method most cost-effective with the least impact on station operation and the environment. Thermal treatment is accomplished by recirculating condenser discharge to raise circulating water (CW) and service water (SW) temperatures to 95 F. This treatment's effectiveness was demonstrated at the company's State Line Station in 1990 and 1991. In parallel with the State Line demonstration, a ComEd task force assessed treatment options for all of its stations. The task force determined that thermal treatment was the least-cost control approach considering construction costs and long-term operating and maintenance (O and M) expenditures. Compared to other alternatives, thermal treatment minimizes unit deratings and outages and minimizes impact to the environment. Based on the task force's assessment and the successful treatment at State Line Station, thermal treatment was selected as the preferred, least-cost method to control zebra mussels at the company's fossil-fueled stations.

  14. 17 CFR 270.3a-3 - Certain investment companies owned by companies which are not investment companies.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 17 Commodity and Securities Exchanges 3 2010-04-01 2010-04-01 false Certain investment companies owned by companies which are not investment companies. 270.3a-3 Section 270.3a-3 Commodity and Securities Exchanges SECURITIES AND EXCHANGE COMMISSION (CONTINUED) RULES AND REGULATIONS, INVESTMENT...

  15. Alabama Power Company HVAC Training Center

    SciTech Connect

    Lovvorn, N.

    1996-06-01

    Alabama Power Company`s (APCo`s) HVAC training Center began in 1986 and serves people from around the country. The staff has a combined field experience of over 75 years. This paper describes the training facility and program.

  16. Natural gas annual 1992: Supplement: Company profiles

    SciTech Connect

    Not Available

    1994-01-01

    The data for the Natural Gas Annual 1991 Supplement : Company Profiles are taken from Form EIA-176, (open quotes) Annual Report of Natural and Supplemental Gas Supply and Disposition (close quotes). Other sources include industry literature and corporate annual reports to shareholders. The companies appearing in this report are major interstate natural gas pipeline companies, large distribution companies, or combination companies with both pipeline and distribution operations. The report contains profiles of 45 corporate families. The profiles describe briefly each company, where it operates, and any important issues that the company faces. The purpose of this report is to show the movement of natural gas through the various States served by the 45 large companies profiled.

  17. The Teaching Company Concept: Action--Reaction.

    ERIC Educational Resources Information Center

    Griffiths, A. J.; Cresswell, C.

    1985-01-01

    Describes how to establish and operate a Teaching Company program, highlighting the required interaction between industry and university. Also gives examples of present and past Teaching Company programs in Great Britain and Wales. (Author/JN)

  18. Ergonomics contributions to company strategies.

    PubMed

    Dul, Jan; Neumann, W Patrick

    2009-07-01

    Managers usually associate ergonomics with occupational health and safety and related legislation, not with business performance. In many companies, these decision makers seem not to be positively motivated to apply ergonomics for reasons of improving health and safety. In order to strengthen the position of ergonomics and ergonomists in the business and management world, we discuss company strategies and business goals to which ergonomics could contribute. Conceptual models are presented and examples are given to illustrate: (1) the present situation in which ergonomics is not part of regular planning and control cycles in organizations to ensure business performance; and (2) the desired situation in which ergonomics is an integrated part of strategy formulation and implementation. In order to realize the desired situation, considerable changes must take place within the ergonomics research, education and practice community by moving from a health ergonomics paradigm to a business ergonomics paradigm, without losing the health and safety goals.

  19. Indigenous and multinational pharmaceutical companies.

    PubMed

    Lilja, J

    1983-01-01

    There is a set of complex relationships between governments and the pharmaceutical companies. These relationships can be analysed in many different ways. In the following article the drug system of each country will be the unit of analysis. The drug system includes all the decision processes, formal as well as informal, from the production or importation of drugs to the intake of the drug by the patient. The aim of this paper is to discuss how environmental factors, the strategies of the drug companies and the national policies, will effect the drug system of a country. Satisfying solutions to the economical and health goals of the country will be searched for. If we want a more rational discussion in this area, professionally and politically, we need more empirical knowledge about the multinational drug companies and their effects on society. This does not mean that we shall sit waiting for this new knowledge. We have to make decisions using todays knowledge. However, in the long run rational decision strategy must include ways to collect important empirical data about the phenomenom under investigation. The aim of this survey is to indicate areas where we already have quite good knowledge and indicate other areas where this data is missing. PMID:6623122

  20. 75 FR 76452 - ConocoPhillips Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-08

    ... Energy Regulatory Commission ConocoPhillips Company v. Enterprise TE Products Pipeline Company LLC... (ICA), ConocoPhillips Company (ConocoPhillips or Complainant) filed a complaint against Enterprise TE... to provide common carrier transportation of propane from ConocoPhillips' refinery in...

  1. 76 FR 20458 - Mutual Holding Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-12

    ... Office of Thrift Supervision Mutual Holding Company AGENCY: Office of Thrift Supervision (OTS), Treasury... collection. Title of Proposal: Mutual Holding Company. OMB Number: 1550-0072. Form Numbers: MHC-1 (OTS Form... whether the applicant meets the statutory and regulatory criteria to form a mutual holding company...

  2. 76 FR 36625 - Mutual Holding Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-22

    ... Office of Thrift Supervision Mutual Holding Company AGENCY: Office of Thrift Supervision (OTS), Treasury... collection. Title of Proposal: Mutual Holding Company. OMB Number: 1550-0072. Form Numbers: MHC-1 (OTS Form... whether the applicant meets the statutory and regulatory criteria to form a mutual holding company...

  3. H.R. 432: A Bill to amend chapter 601 of title 49, United States Code, to improve natural gas and hazardous liquid pipeline safety, in response to the natural gas pipeline accident in Edison, New Jersey, and for other purposes. Introduced in the House of Representatives, One Hundred Fourth Congress, First session

    SciTech Connect

    1995-12-31

    This document contains H.R. 432, A Bill to amend chapter 601 of title 49, United States Code, to improve natural gas and hazardous liquid pipeline safety, in response to the natural gas pipeline accident in Edison, New Jersey, and for other purposes. This Bill was introduced in the House of Representatives, 104th Congress, First Session, January 5, 1995.

  4. "Life without nuclear power": A nuclear plant retirement formulation model and guide based on economics. San Onofre Nuclear Generating Station case: Economic impacts and reliability considerations leading to plant retirement

    NASA Astrophysics Data System (ADS)

    Wasko, Frank

    Traditionally, electric utilities have been slow to change and very bureaucratic in nature. This culture, in and of itself, has now contributed to a high percentage of United States electric utilities operating uneconomical nuclear plants (Crooks, 2014). The economic picture behind owning and operating United States nuclear plants is less than favorable for many reasons including rising fuel, capital and operating costs (EUCG, 2012). This doctoral dissertation is specifically focused on life without nuclear power. The purpose of this dissertation is to create a model and guide that will provide electric utilities who currently operate or will operate uneconomical nuclear plants the opportunity to economically assess whether or not their nuclear plant should be retired. This economic assessment and stakeholder analysis will provide local government, academia and communities the opportunity to understand how Southern California Edison (SCE) embraced system upgrade import and "voltage support" opportunities to replace "base load" generation from San Onofre Nuclear Generating Station (SONGS) versus building new replacement generation facilities. This model and guide will help eliminate the need to build large replacement generation units as demonstrated in the SONGS case analysis. The application of The Nuclear Power Retirement Model and Guide will provide electric utilities with economic assessment parameters and an evaluation assessment progression needed to better evaluate when an uneconomical nuclear plant should be retired. It will provide electric utilities the opportunity to utilize sound policy, planning and development skill sets when making this difficult decision. There are currently 62 nuclear power plants (with 100 nuclear reactors) operating in the United States (EIA, 2014). From this group, 38 are at risk of early retirement based on the work of Cooper (2013). As demonstrated in my model, 35 of the 38 nuclear power plants qualify to move to the economic

  5. 78 FR 27218 - Mountaineer Gas Company v. Washington Gas Light Company: Notice of Complaint

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-09

    ... Energy Regulatory Commission Mountaineer Gas Company v. Washington Gas Light Company: Notice of Complaint... complaint against Washington Gas Light Company (WGL or Respondent), pursuant to the Natural Gas Act (NGA... the contacts of Washington Gas Light Company as listed on the Commission's list of Corporate...

  6. 77 FR 55207 - Florida Gas Transmission Company, LLC, Florida Gas Transmission Company, LLC; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... Energy Regulatory Commission Florida Gas Transmission Company, LLC, Florida Gas Transmission Company, LLC; Notice of Application Take notice that on August 16, 2012, Florida Gas Transmission Company, LLC (FGT... & Tariffs, Florida Gas Transmission Company, LLC, 5051 Westheimer Road, Houston, Texas, 77056, or call...

  7. 78 FR 28831 - Mountaineer Gas Company v. Washington Gas Light Company; Notice of Complaint

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ... Energy Regulatory Commission Mountaineer Gas Company v. Washington Gas Light Company; Notice of Complaint Take notice that on April 30, 2013, Mountaineer Gas Company (Mountaineer or Complainant) filed a complaint against Washington Gas Light Company (WGL or Respondent), pursuant to the Natural Gas Act...

  8. 75 FR 60865 - Surety Companies Acceptable on Federal Bonds: Allied World Reinsurance Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-01

    ... Supplement No. 3 to the Treasury Department Circular 570, 2010 Revision, published July 1, 2010, at 75 FR... Fiscal Service Surety Companies Acceptable on Federal Bonds: Allied World Reinsurance Company AGENCY.... 9305 to the following company: Allied World Reinsurance Company (NAIC 22730). Business Address:...

  9. 78 FR 18970 - Trunkline LNG Company, LLC; Trunkline LNG Export, LLC; Trunkline Gas Company, LLC; Supplemental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-28

    ... Energy Regulatory Commission Trunkline LNG Company, LLC; Trunkline LNG Export, LLC; Trunkline Gas Company... Trunkline LNG Company, LLC; Trunkline LNG Export, LLC; and Trunkline Gas Company, LLC (collectively referred... entitled ``An Interstate Natural Gas Facility On My Land? What Do I Need To Know?'' is available...

  10. 75 FR 21146 - Union Pacific Railroad Company-Trackage Rights Exemption-BNSF Railway Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-22

    ... Surface Transportation Board Union Pacific Railroad Company--Trackage Rights Exemption--BNSF Railway Company Pursuant to a written trackage rights agreement dated December 16, 2009, BNSF Railway Company (BNSF) has agreed to grant overhead trackage rights to Union Pacific Railroad Company (UP) over a...

  11. 76 FR 34805 - Arkansas Midland Railroad Company, Inc., Trackage Rights Exemption; Caddo Valley Railroad Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-14

    ... Surface Transportation Board Arkansas Midland Railroad Company, Inc., Trackage Rights Exemption; Caddo Valley Railroad Company Pursuant to a written trackage rights agreement, Caddo Valley Railroad Company (CVR) has agreed to grant local trackage rights to Arkansas Midland Railroad Company, Inc. (AKMD)...

  12. 78 FR 63564 - BNSF Railway Company-Trackage Rights Exemption-Union Pacific Railroad Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-24

    ... Surface Transportation Board BNSF Railway Company--Trackage Rights Exemption--Union Pacific Railroad Company Pursuant to a written trackage rights agreement, Union Pacific Railroad Company (UP) has agreed to grant overhead trackage rights to BNSF Railway Company (BNSF) over the following UP rail lines: (1)...

  13. 77 FR 14058 - BNSF Railway Company-Trackage Rights Exemption-Union Pacific Railroad Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-08

    ... Surface Transportation Board BNSF Railway Company--Trackage Rights Exemption--Union Pacific Railroad Company Pursuant to a written trackage rights agreement, Union Pacific Railroad Company (UP) has agreed to grant trackage rights to BNSF Railway Company (BNSF) over a portion of a line of railroad known as...

  14. 77 FR 11529 - Louisville Gas and Electric Company; Kentucky Utilities Company; Notice of Petition for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-27

    ... Energy Regulatory Commission Louisville Gas and Electric Company; Kentucky Utilities Company; Notice of... Gas and Electric Company and Kentucky Utilities Company, filed a Petition for Declaratory Order... (toll free). For TTY, call (202) 502-8659. Comment Date: 5 p.m. Eastern Time on March 15, 2012....

  15. 75 FR 10341 - Montoff Transportation Company, LLC-Acquisition Exemption-BNSF Railway Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-05

    ... Surface Transportation Board Montoff Transportation Company, LLC--Acquisition Exemption--BNSF Railway Company Montoff Transportation Company, LLC (Montoff), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to acquire from BNSF Railway Company (BNSF) its right to reactivate...

  16. 78 FR 72672 - Owensboro Municipal Utilities v. Louisville Gas and Electric Company, Kentucky Utilities Company...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-03

    ... Energy Regulatory Commission Owensboro Municipal Utilities v. Louisville Gas and Electric Company, Kentucky Utilities Company; Notice of Filing Take notice that on November 22, 2013, Louisville Gas and Electric Company and Kentucky Utilities Company (collectively LG&E/KU) filed its Refund Report in the...

  17. 17 CFR 250.7 - Companies deemed not to be electric or gas utility companies.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... electric or gas utility companies. 250.7 Section 250.7 Commodity and Securities Exchanges SECURITIES AND EXCHANGE COMMISSION (CONTINUED) GENERAL RULES AND REGULATIONS, PUBLIC UTILITY HOLDING COMPANY ACT OF 1935 Registration and General Exemptions § 250.7 Companies deemed not to be electric or gas utility companies....

  18. Owners of Nuclear Power Plants

    SciTech Connect

    Reid, R.L.

    2000-01-12

    Commercial nuclear power plants in this country can be owned by a number of separate entities, each with varying ownership proportions. Each of these owners may, in turn, have a parent/subsidiary relationship to other companies. In addition, the operator of the plant may be a different entity as well. This report provides a compilation on the owners/operators for all commercial power reactors in the United States. While the utility industry is currently experiencing changes in organizational structure which may affect nuclear plant ownership, the data in this report is current as of November 1999. The report is divided into sections representing different aspects of nuclear plant ownership.

  19. Owners of nuclear power plants

    SciTech Connect

    Hudson, C.R.; White, V.S.

    1996-11-01

    Commercial nuclear power plants in this country can be owned by a number of separate entities, each with varying ownership proportions. Each of these owners may, in turn, have a parent/subsidiary relationship to other companies. In addition, the operator of the plant may be a different entity as well. This report provides a compilation on the owners/operators for all commercial power reactors in the United States. While the utility industry is currently experiencing changes in organizational structure which may affect nuclear plant ownership, the data in this report is current as of July 1996. The report is divided into sections representing different aspects of nuclear plant ownership.

  20. Amedee geothermal power plant

    SciTech Connect

    Hodgson, S.F.

    1988-12-01

    In September 1988, the power plant began generating electricity in Northern California, near Honey Lake. The plant generates 2 megawatts, net, of electricity in the winter, and from 20 to 30% less in the summer, depending on the temperature. Geothermal fluids from two wells are used to operate the plant, and surface discharge is used to dispose of the spent fluids. This is possible because the geothermal fluids have a very low salinity and a composition the same as area hot spring waters. The binary power plant has a Standard Offer No. 4 contract for 5 megawatts with pacific Gas and Electric Company. Sometime in the near future, they will expand the project to add another 3 megawatts of electrical generation.

  1. 40 CFR 52.1675 - Control strategy and regulations: Sulfur oxides.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) of the Act, and 40 CFR part 51 (relating to approval of and revisions to State implementation plans... Campus Main Boiler (Compton Hall): Two boilers shut-down; One boiler converted; South Campus—Boiler Plant... the requirements of that paragraph, the Consolidated Edison Company shall not burn fuel oil with...

  2. 40 CFR 52.1675 - Control strategy and regulations: Sulfur oxides.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) of the Act, and 40 CFR part 51 (relating to approval of and revisions to State implementation plans... Campus Main Boiler (Compton Hall): Two boilers shut-down; One boiler converted; South Campus—Boiler Plant... the requirements of that paragraph, the Consolidated Edison Company shall not burn fuel oil with...

  3. Salt-gradient solar ponds in the Salton Sea - brine optical quality and performance

    SciTech Connect

    Marsh, H.E.; DeFranco, D.M.; Haack, R.F.; McMurrin, J.C.; Reilly, W.W.; Singer, M.J.; Wu, Y.C.

    1981-01-01

    In a joint project, the Southern California Edison Company, Ormat Turbines, Ltd., of Israel, and the Jet Propulsion Laboratory are studying the feasibility of solar pond power plants in the Salton Sea. Spectrographic measurements made of Salton Sea water revealed the presence of dissolved matter, thought to be organic, and trace ions, which absorb light in the blue and of the spectrum. 9 refs.

  4. 7. Photocopy of architectural drawing #571717 (original drawing located in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. Photocopy of architectural drawing #571717 (original drawing located in Southern California Edison Archives, Rosemead, California). THREE FAMILY HOUSE FOR SOUTHERN SIERRAS POWER COMPANY LEE VINING CREEK POWER PLANT, FOUNDATION PLAN. - Lee Vining Creek Hydroelectric System, Triplex Cottage, Lee Vining Creek, Lee Vining, Mono County, CA

  5. 51. Photocopy of photograph, October 16, 1942. VIEW, LOOKING DOWNSTREAM, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    51. Photocopy of photograph, October 16, 1942. VIEW, LOOKING DOWNSTREAM, OF POWER HOUSE DURING FLOOD. (Courtesy of the Potomac Edison Company Library (Hagerstown, MD), Historical Data Files, Dam NO. 5 listing) - Dam No. 5 Hydroelectric Plant, On Potomac River, Hedgesville, Berkeley County, WV

  6. 58. Photocopy of photograph, no date. VIEW OF GENERATOR UNIT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    58. Photocopy of photograph, no date. VIEW OF GENERATOR UNIT 2. (Courtesy of the Potomac Edison Company Library (Hagerstown, MD), Historical Data Files, Properties-Buildings and Equipment listing) - Dam No. 5 Hydroelectric Plant, On Potomac River, Hedgesville, Berkeley County, WV

  7. 49. Photocopy of photograph, October 22, 1933. VIEW OF POWER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    49. Photocopy of photograph, October 22, 1933. VIEW OF POWER HOUSE, FOREBAY AND RIVER. (Courtesy of the Potomac Edison Company Library (Hagerstown, MD), Historical Data Files, Dam No. 5 listing) - Dam No. 5 Hydroelectric Plant, On Potomac River, Hedgesville, Berkeley County, WV

  8. 37. Photocopy of photograph, c.1930. FOREBAY (WEST) ELEVATION. NOTE ABSENCE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    37. Photocopy of photograph, c.1930. FOREBAY (WEST) ELEVATION. NOTE ABSENCE OF MONITORS. (Courtesy of the Potomac Edison Company Library (Hagerstown, MD), Historical Data Files, Dam No. 5 listing) - Dam No. 5 Hydroelectric Plant, On Potomac River, Hedgesville, Berkeley County, WV

  9. 46. Photocopy of photograph, c. 1933. VIEW OF DAM AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    46. Photocopy of photograph, c. 1933. VIEW OF DAM AND FOREBAY. NOTE ALL WATER FLOWING THROUGH FOREBAY AND OUT EITHER TAILRACE OR SLUICE GATE (INSTEAD OF OVER DAM) BECAUSE OF LOW WATER FLOW. (Courtesy of the Potomac Edison Company Library (Hagerstown, MD), Historical Data Files, Dam No. 5 listing - Dam No. 5 Hydroelectric Plant, On Potomac River, Hedgesville, Berkeley County, WV

  10. 57. Photocopy of photograph, c. 1946. DETAIL OF GENERATOR UNIT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    57. Photocopy of photograph, c. 1946. DETAIL OF GENERATOR UNIT 2, GOVERNOR, AND SWITCHBOARD. (Courtesy of the Potomac Edison Company Library (Hagerstown, MD), Historical Data Files, Dam No. 5 listing) - Dam No. 5 Hydroelectric Plant, On Potomac River, Hedgesville, Berkeley County, WV

  11. 50. Photocopy of photograph, April 27, 1937. VIEW OF POWER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    50. Photocopy of photograph, April 27, 1937. VIEW OF POWER HOUSE AND SUBSTATION DURING FLOOD. (Courtesy of the Potomac Edison Company Library (Hagerstown, MD), Historical Data Files, Dam No. 5 listing) - Dam No. 5 Hydroelectric Plant, On Potomac River, Hedgesville, Berkeley County, WV

  12. 44. Photocopy of photograph, October 20, 1933. VIEW OF FOREBAY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    44. Photocopy of photograph, October 20, 1933. VIEW OF FOREBAY AND INLET OPENINGS, NOTE SLUICE GATE AND DAM AT LOWER RIGHT. (Courtesy of the Potomac Edison Company Library (Hagerstown, MD), Historical Data Files, Dam No. 5 listing) - Dam No. 5 Hydroelectric Plant, On Potomac River, Hedgesville, Berkeley County, WV

  13. 13. Photocopy of architectural drawing #571718 (original drawing located in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. Photocopy of architectural drawing #571718 (original drawing located in Southern California Edison Archives, Rosemead, California). THREE FAMILY HOUSE FOR SOUTHERN SIERRAS POWER COMPANY LEE VINING CREEK POWER PLANT, FLOOR PLAN. - Lee Vining Creek Hydroelectric System, Triplex Cottage, Lee Vining Creek, Lee Vining, Mono County, CA

  14. Reload design process at Yankee Atomic Electric Company

    SciTech Connect

    Weader, R.J.

    1986-01-01

    Yankee Atomic Electric Company (YAEC) performs reload design and licensing for their nuclear power plants: Yankee Rowe, Maine Yankee, and Vermont Yankee. Significant savings in labor and computer costs have been achieved in the reload design process by the use of the SIMULATE nodal code using the CASMO assembly burnup code or LEOPARD pin cell burnup code inputs to replace the PDQ diffusion theory code in many required calculations for the Yankee Rowe and Maine Yankee pressurized water reactors (PWRs). An efficient process has evolved for the design of reloads for the Vermont Yankee boiling water reactor (BWR). Due to the major differences in the core design of the three plants, different reload design processes have evolved for each plant.

  15. Lifetime Innovations of Thomas Edison

    THOMAS, 111th Congress

    Rep. Payne, Donald M. [D-NJ-10

    2009-01-06

    02/04/2009 Referred to the Subcommittee on National Parks, Forests and Public Lands. (All Actions) Notes: For further action, see H.R.146, which became Public Law 111-11 on 3/30/2009. Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  16. Thomas Edison Accelerated Elementary School.

    ERIC Educational Resources Information Center

    Levin, Henry M.; Chasin, Gene

    This paper describes early outcomes of a Sacramento, California, elementary school that participated in the Accelerated Schools Project. The school, which serves many minority and poor students, began training for the project in 1992. Accelerated Schools were designed to advance the learning rate of students through a gifted and talented approach,…

  17. Environmental Experiments...from Edison.

    ERIC Educational Resources Information Center

    Schultz, Robert F.

    Background information, lists of materials needed, and procedures are provided for 12 experiments which focus on various aspects of pollution and the environment. Topics considered in the investigations are: (1) solids in the air; (2) effect of air pollution on nylon; (3) measuring lung capacity; (4) an electrical smoke trap; (5) photosynthesis;…

  18. [Tampa Electric Company IGCC project]. Final public design report; Technical progress report

    SciTech Connect

    1996-07-01

    This final Public Design Report (PDR) provides completed design information about Tampa Electric Company`s Polk Power Station Unit No. 1, which will demonstrate in a commercial 250 MW unit the operating parameters and benefits of the integration of oxygen-blown, entrained-flow coal gasification with advanced combined cycle technology. Pending development of technically and commercially viable sorbent for the Hot Gas Cleanup System, the HGCU also is demonstrated. The report is organized under the following sections: design basis description; plant descriptions; plant systems; project costs and schedule; heat and material balances; general arrangement drawings; equipment list; and miscellaneous drawings.

  19. 75 FR 66806 - Nationwide Life Insurance Company, et al.,

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-29

    ... COMMISSION Nationwide Life Insurance Company, et al., Notice of Application October 25, 2010. AGENCY...: Nationwide Life Insurance Company (``NWL''), Nationwide Life and Annuity Insurance Company (``NLAIC... contracts and/or variable life insurance policies issued by the Insurance Companies (collectively,...

  20. 75 FR 13147 - Integrity Life Insurance Company, et al.;

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-18

    ... COMMISSION Integrity Life Insurance Company, et al.; Notice of Application March 10, 2010. AGENCY: Securities...: Integrity Life Insurance Company (``Integrity''), Separate Account I of Integrity Life Insurance Company (``Integrity Separate Account I''), Separate Account II of Integrity Life Insurance Company...

  1. Why good companies go bad.

    PubMed

    Sull, D N

    1999-01-01

    One of the most common business phenomena is also one of the most perplexing: when successful companies face big changes, they often fail to respond effectively. Many assume that the problem is paralysis, but the real problem, according to Donald Sull, is active inertia--an organization's tendency to persist in established patterns of behavior. Most leading businesses owe their prosperity to a fresh competitive formula--a distinctive combination of strategies, relationships, processes, and values that sets them apart from the crowd. But when changes occur in a company's markets, the formula that brought success instead brings failure. Stuck in the modes of thinking and working that have been successful in the past, market leaders simply accelerate all their tried-and-true activities. In attempting to dig themselves out of a hole, they just deepen it. In particular, four things happen: strategic frames become blinders; processes harden into routines; relationships become shackles; and values turn into dogmas. To illustrate his point, the author draws on examples of pairs of industry leaders, like Goodyear and Firestone, whose fates diverged when they were forced to respond to dramatic changes in the tire industry. In addition to diagnosing the problem, Sull offers practical advice for avoiding active inertia. Rather than rushing to ask, "What should we do?" managers should pause to ask, "What hinders us?" That question focuses attention on the proper things: the strategic frames, processes, relationships, and values that can subvert action by channeling it in the wrong direction.

  2. Great Western Malting Company geothermal project, Pocatello, Idaho. Final report

    SciTech Connect

    Christensen, N.T.; McGeen, M.A.; Corlett, D.F.; Urmston, R.

    1981-12-23

    The Great Western Malting Company recently constructed a barley malting facility in Pocatello, Idaho, designed to produce 6.0 million bushels per year of brewing malt. This facility uses natural gas to supply the energy for germination and kilning processes. The escalating cost of natural gas has prompted the company to look at alternate and more economical sources of energy. Trans Energy Systems has investigated the viabiity of using geothermal energy at the new barley processing plant. Preliminary investigations show that a geothermal resource probably exists, and payback on the installation of a system to utilize the resource will occur in under 2 years. The Great Western Malting plant site has geological characteristics which are similar to areas where productive geothermal wells have been established. Geological investigations indicate that resource water temperatures will be in the 150 to 200/sup 0/F range. Geothermal energy of this quality will supply 30 to 98% of the heating requirements currently supplied by natural gas for this malting plant. Trans Energy Systems has analyzed several systems of utilizing the geothermal resource at the Great Western barley malting facility. These systems included: direct use of geothermal water; geothermal energy heating process water through an intermediary heat exchanger; coal or gas boosted geothermal systems; and heat pump boosted geothermal system. The analysis examined the steps that are required to process the grain.

  3. 12 CFR 583.4 - Bank holding company.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 12 Banks and Banking 6 2013-01-01 2012-01-01 true Bank holding company. 583.4 Section 583.4 Banks... AFFECTING SAVINGS AND LOAN HOLDING COMPANIES § 583.4 Bank holding company. The term bank holding company means any company which has control over any bank or over any company that is or becomes a bank...

  4. 12 CFR 583.4 - Bank holding company.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 12 Banks and Banking 6 2014-01-01 2012-01-01 true Bank holding company. 583.4 Section 583.4 Banks... AFFECTING SAVINGS AND LOAN HOLDING COMPANIES § 583.4 Bank holding company. The term bank holding company means any company which has control over any bank or over any company that is or becomes a bank...

  5. 12 CFR 583.4 - Bank holding company.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 12 Banks and Banking 6 2012-01-01 2012-01-01 false Bank holding company. 583.4 Section 583.4 Banks... AFFECTING SAVINGS AND LOAN HOLDING COMPANIES § 583.4 Bank holding company. The term bank holding company means any company which has control over any bank or over any company that is or becomes a bank...

  6. 12 CFR 583.4 - Bank holding company.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 5 2011-01-01 2011-01-01 false Bank holding company. 583.4 Section 583.4 Banks... AFFECTING SAVINGS AND LOAN HOLDING COMPANIES § 583.4 Bank holding company. The term bank holding company means any company which has control over any bank or over any company that is or becomes a bank...

  7. 12 CFR 583.4 - Bank holding company.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Bank holding company. 583.4 Section 583.4 Banks... AFFECTING SAVINGS AND LOAN HOLDING COMPANIES § 583.4 Bank holding company. The term bank holding company means any company which has control over any bank or over any company that is or becomes a bank...

  8. Plant Profiles - Industrial Energy Management in Action

    SciTech Connect

    2001-02-01

    This 24-page brochure profiles industrial manufacturing firms who are achieving significant energy savings in their plants. The DOE Office of Industrial Technologies six plant-of-the-year nominees are featured, and an additional 10 projects from other companies are also highlighted. Information on OIT's awards and recognition process, and information on OIT and BestPractices is also included.

  9. Platts top 250 global energy company rankings

    SciTech Connect

    2006-11-15

    The third annual survey of global energy companies measures companies' financial performance using four metrics: asset worth, revenues, profits and return on invested capital. The following industry segments were analysed: coal and consumable fuel companies; diversified utilities; exploration and production; electric utilities; gas utilities; integrated oil and gas companies; refining and marketing; independent power producers and storage and transfer companies. Integrated oil and gas companies (IOGs) captured nine out of the top ten spots while IPPS struggled in 2005 as the sector on a whole lost money. The exploration and production segment showed financial stability while gas utilities saw their financials climb. The Exxon Mobile Corp. continued its reign of the number one spot.

  10. 17 CFR 250.12 - Exemption of certain public utility companies from the definition of subsidiary companies of...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... utility companies from the definition of subsidiary companies of holding companies. 250.12 Section 250.12... REGULATIONS, PUBLIC UTILITY HOLDING COMPANY ACT OF 1935 Registration and General Exemptions § 250.12 Exemption of certain public utility companies from the definition of subsidiary companies of holding...

  11. Solar process steam for a pharmaceutical company in Jordan

    NASA Astrophysics Data System (ADS)

    Berger, M.; Mokhtar, M.; Zahler, C.; Al-Najami, M. M. R.; Krüger, D.; Hennecke, K.

    2016-05-01

    This paper presents details of the recent installation of a linear Fresnel collector to provide saturated steam for process heat usage through Direct Steam Generation (DSG) for industrial use in the Jordanian pharmaceuticals manufacturing company RAM Pharma, where first solar steam has been provided in March 2015. This commercial DSG project also represents the first solar DSG plant in MENA. During sunshine, the system achieves a solar fraction of 100 %, and the conventional steam boiler is not needed. In the evening the fossil fired backup takes over automatically and replaces the solar collector in operation. Operational experience, details of the control strategy, and measurement data are presented in the paper.

  12. Honda motor company's CVCC engine

    SciTech Connect

    Abernathy, W.J.; Ronan, L.

    1980-07-01

    Honda Motor Company of Japan in a four-year period from 1968 to 1872 designed, tested, and mass-produced a stratified charge engine, the CVCC, which in comparison to conventional engines of similar output at the time was lower in CO, HC and NO/sub x/ emissions and higher in fuel economy. Honda developed the CVCC engine without government assistance or outside help. Honda's success came at a time when steadily increasing fuel costs and the various provisions of the Clean Air Act had forced US automakers to consider possible alternatives to the conventional gasoline engine. While most major engine manufacturers had investigated some form of stratified charge engine, Honda's CVCC was the only one to find successful market application. This case study examines the circumstances surrounding the development of the CVCC engine and its introduction into the Japanese and American markets.

  13. Special Analysis for the Disposal of the Consolidated Edison Uranium Solidification Project Waste Stream at the Area 5 Radioactive Waste Management Site, Nevada National Security Site, Nye County, Nevada

    SciTech Connect

    NSTec Environmental Management

    2013-01-31

    The purpose of this Special Analysis (SA) is to determine if the Oak Ridge (OR) Consolidated Edison Uranium Solidification Project (CEUSP) uranium-233 (233U) waste stream (DRTK000000050, Revision 0) is acceptable for shallow land burial (SLB) at the Area 5 Radioactive Waste Management Site (RWMS) on the Nevada National Security Site (NNSS). The CEUSP 233U waste stream requires a special analysis because the concentrations of thorium-229 (229Th), 230Th, 232U, 233U, and 234U exceeded their NNSS Waste Acceptance Criteria action levels. The acceptability of the waste stream is evaluated by determining if performance assessment (PA) modeling provides a reasonable expectation that SLB disposal is protective of human health and the environment. The CEUSP 233U waste stream is a long-lived waste with unique radiological hazards. The SA evaluates the long-term acceptability of the CEUSP 233U waste stream for near-surface disposal as a two tier process. The first tier, which is the usual SA process, uses the approved probabilistic PA model to determine if there is a reasonable expectation that disposal of the CEUSP 233U waste stream can meet the performance objectives of U.S. Department of Energy Manual DOE M 435.1-1, “Radioactive Waste Management,” for a period of 1,000 years (y) after closure. The second tier addresses the acceptability of the OR CEUSP 233U waste stream for near-surface disposal by evaluating long-term site stability and security, by performing extended (i.e., 10,000 and 60,000 y) modeling analyses, and by evaluating the effect of containers and the depth of burial on performance. Tier I results indicate that there is a reasonable expectation of compliance with all performance objectives if the OR CEUSP 233U waste stream is disposed in the Area 5 RWMS SLB disposal units. The maximum mean and 95th percentile PA results are all less than the performance objective for 1,000 y. Monte Carlo uncertainty analysis indicates that there is a high likelihood of

  14. Plant maintenance and plant life extension issue, 2007

    SciTech Connect

    Agnihotri, Newal

    2007-03-15

    The focus of the March-April issue is on plant maintenance and plant life extension. Major articles/reports in this issue include: Three proposed COLs expected in 2007, by Dale E. Klein, U.S. Nuclear Regulatory Commission; Delivering behaviors that our customers value, by Jack Allen, Westinghouse Electric Company; Facilitating high-level and fuel waste disposal technologies, by Malcolm Gray, IAEA, Austria; Plant life management and long-term operation, by Pal Kovacs, OECD-NEA, France; Measuring control rod position, by R. Taymanov, K. Sapozhnikova, I. Druzhinin, D.I. Mendeleyev, Institue for Metrology, Russia; and, 'Modernization' means higher safety, by Svetlana Genova, Kozluduy NPP plc, Bulgaria.

  15. 76 FR 31954 - San Jose Water Company; Notice of Declaration of Intention and Soliciting Comments, Protests, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-02

    ... which the PRVs are placed, carries water from the city's water treatment plant and is part of the San Jose public drinking water system. The water supplied to the water treatment plant comes from three... Energy Regulatory Commission San Jose Water Company; Notice of Declaration of Intention and...

  16. 76 FR 23848 - Carolina Power And Light Company; Notice of Withdrawal of Application for Amendment to Renewed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-28

    ... Operating License No. NPF-63 for the Shearon Harris Nuclear Power Plant, Unit 1, located in Wake County... in the Shearon Harris Nuclear Power Plant, Unit 1 safety analyses. Topical Report, EMF-2103(P)(A... COMMISSION Carolina Power And Light Company; Notice of Withdrawal of Application for Amendment to...

  17. 47 CFR 32.6510 - Other property, plant and equipment expenses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CARRIER SERVICES UNIFORM SYSTEM OF ACCOUNTS FOR TELECOMMUNICATIONS COMPANIES Instructions for Expense Accounts § 32.6510 Other property, plant and equipment expenses. Class B telephone companies shall use this account for expenses of the type and character required of Class A companies in Accounts 6511 and 6512....

  18. 78 FR 19366 - Surety Companies Acceptable on Federal Bonds: Ohio Security Insurance Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-29

    ... Supplement No. 6 to the Treasury Department Circular 570, 2012 Revision, published July 2, 2012, at 77 FR.... 9305 to the following company: Ohio Security Insurance Company (NAIC 24082). BUSINESS ADDRESS: 62...

  19. Philadelphia Electric Company's computer replacement lessons learned at Peach Bottom

    SciTech Connect

    Clark, J.M.; O'Hara, J.

    1989-01-01

    The current regulatory climate continues to prod today's nuclear utilities toward safer and more reliable operation of their plants. U.S. Nuclear Regulatory Commission guides NUREG-0660, NUREG-0696, and Supplement I to NUREG-0737 have all set forth increased requirements for plant monitoring. In response, the industry has looked at their existing plant computer systems as targets for enhancement or upgrade. This external pressure is nearly matched by the increasing demands made on existing computer systems by utility engineering and operations departments. The longer utilities postpone this evolution, the more likely they are to replace the entire system rather than upgrade the existing one. The older systems become harder to maintain and eventually are technically inferior to new systems, which have benefited from advances in computer technology in recent years. Enhancements become less economically advantageous than system replacements as the spread in technology widens. The object of this paper is to describe the Plant Process Computer Replacement Project at Philadelphia Electric Company's (PECo's) Peach Bottom Atomic Power Station. This paper explores (a) the impact on the plant, (b) the design and engineering services required, and (c) the planning and communication essential to a successful computer replacement project.

  20. Service company alliance reduces tight sands frac costs

    SciTech Connect

    Hunter, J.L. ); Stuchly, S.G. )

    1994-08-15

    Smaller, multiple-stage fracture treatments, worked out by an alliance between a producing and a service company, were a significant element in reducing costs for fracturing Carthage Cotton Valley infill wells in Panola County, Texas. Pennzoil's infill drilling program takes advantage of the Texas Railroad Commission's (RRC) ruling that allows optional 80-acre well spacing in this tight gas-sand reservoir. Pennzoil spudded 29 wells between September 1992 and December 1993 and expects to spud 20 more in 1994. The Pennzoil-Halliburton alliance began in September 1992 for the purpose of drilling and completing Cotton Valley infill wells through 1993. The two companies share the cost of new technology development, with Pennzoil providing the rig times to test Halliburton technology. To date, the alliance has experimented with an elastic strain relaxation, a six-arm extensometer, and a water-recovery surfactant. Some of the features of the alliance are: Halliburton guarantees the availability of crews and equipment to meet Pennzoil's drilling and completion schedule; Halliburton technical advisor studies existing wells to find candidates for workover or refracture; the technical advisor analyzes, plants, and evaluates the ongoing program; and the alliance is not rigidly structured, and other service companies perform part of the work. Both parties have benefited financially from the alliance and well performance has met or exceeded expectations. The alliance has enabled Pennzoil to stay on a rigid and aggressive drilling schedule and through efforts of the alliance, fracture orientation has been confirmed.

  1. Scaling Behavior in Economics: I. Empirical Results for Company Growth

    NASA Astrophysics Data System (ADS)

    Nunes Amaral, Luís A.; Buldyrev, Sergey V.; Havlin, Shlomo; Leschhorn, Heiko; Maass, Philipp; Salinger, Michael A.; Stanley, H. Eugene; Stanley, Michael H. R.

    1997-04-01

    We address the question of the growth of firm size. To this end, we analyze the Compustat data base comprising all publicly-traded United States manufacturing firms within the years 1974-1993. We find that the distribution of firm sizes remains stable for the 20 years we study, i.e., the mean value and standard deviation remain approximately constant. We study the distribution of sizes of the “new” companies in each year and find it to be well approximated by a log-normal. We find (i) the distribution of the logarithm of the growth rates, for a fixed growth period of one year, and for companies with approximately the same size S, display an exponential form, and (ii) the fluctuations in the growth rates measured by the width of this distribution σ_1 scale as a power with S, σ_1sim S^{-β}. We find that the exponent β takes the same value, within the error bars, for several measures of the size of a company. In particular, we obtain: β = 0.20± 0.03 for sales, β = 0.18± 0.03 for number of employees, β = 0.18± 0.03 for assets, β = 0.18± 0.03 for cost of goods sold, and β = 0.20± 0.03 for property, plant, and equipment.

  2. 19. View of Andrew McLean Company Textile Mill looking south; ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. View of Andrew McLean Company Textile Mill looking south; Building No. 2 at center, Botany Mills Lanolin Retrieval plant site in foreground - Dundee Canal Industrial Historic District, Beginning at George Street in Passaic & extending north along Dundee Canal approximately 1.2 miles to Canal headgates opposite East Clifton Avenue in Clifton, Passaic, Passaic County, NJ

  3. 16. Photocopy of a photograph1921 EASTSIDE POWER PLANT LOOKING NORTH ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. Photocopy of a photograph--1921 EASTSIDE POWER PLANT LOOKING NORTH - American Falls Water, Power & Light Company, Island Power Plant, Snake River, below American Falls Dam, American Falls, Power County, ID

  4. 14. Photocopy of a photograph1921 SUSPENSION BRIDGE TO WESTSIDE PLANT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. Photocopy of a photograph--1921 SUSPENSION BRIDGE TO WESTSIDE PLANT AND WESTSIDE PENSTOCK - American Falls Water, Power & Light Company, Island Power Plant, Snake River, below American Falls Dam, American Falls, Power County, ID

  5. 12 CFR 225.101 - Bank holding company's subsidiary banks owning shares of nonbanking companies.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 3 2010-01-01 2010-01-01 false Bank holding company's subsidiary banks owning shares of nonbanking companies. 225.101 Section 225.101 Banks and Banking FEDERAL RESERVE SYSTEM (CONTINUED) BOARD OF GOVERNORS OF THE FEDERAL RESERVE SYSTEM BANK HOLDING COMPANIES AND CHANGE IN...

  6. 76 FR 30397 - Faribault Woolen Mill Company, Faribault, MN; Faribo Woolens, Inc., a Related Company of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-25

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF LABOR Employment and Training Administration Faribault Woolen Mill Company, Faribault, MN; Faribo Woolens, Inc., a Related Company of Faribault Woolen Mill Company, Faribault, MN; Amended Certification Regarding Eligibility To Apply for Worker...

  7. 78 FR 40268 - Norfolk Southern Railway Company-Lease Exemption-BNSF Railway Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-03

    ... Surface Transportation Board Norfolk Southern Railway Company--Lease Exemption--BNSF Railway Company... June 26, 2013, Norfolk Southern Railway Company (NSR) filed a petition under 49 U.S.C. 10502 and 49 CFR Part 1121 for exemption from the provisions of 49 U.S.C. 11323(a)(2) to lease from BNSF Railway...

  8. 77 FR 64185 - BNSF Railway Company-Acquisition and Operation Exemption-Nebraska Northeastern Railway Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-18

    ... Surface Transportation Board BNSF Railway Company--Acquisition and Operation Exemption-- Nebraska Northeastern Railway Company AGENCY: Surface Transportation Board. ACTION: Notice of exemption. SUMMARY: The.... 11323-25 for BNSF Railway Company (BNSF), a Class I rail carrier, to acquire and operate a 120.4-...

  9. 75 FR 3523 - Union Pacific Railroad Company-Temporary Trackage Rights Exemption-BNSF Railway Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-21

    ... Surface Transportation Board Union Pacific Railroad Company--Temporary Trackage Rights Exemption--BNSF Railway Company Pursuant to a written trackage rights agreement dated December 22, 2009, BNSF Railway... Railroad Company (UP) over BNSF lines extending between BNSF milepost 10.2 at Tukwila, WA, and...

  10. 77 FR 60742 - BNSF Railway Company-Temporary Trackage Rights Exemption-Union Pacific Railroad Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-04

    ... Surface Transportation Board BNSF Railway Company--Temporary Trackage Rights Exemption--Union Pacific Railroad Company Pursuant to a written trackage rights agreement dated August 10, 2012, Union Pacific Railroad Company (UP) has agreed to grant restricted temporary trackage rights to BNSF Railway...

  11. 75 FR 63540 - Norfolk Southern Railway Company-Trackage Rights Exemption-Illinois Central Railroad Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-15

    ... Surface Transportation Board Norfolk Southern Railway Company--Trackage Rights Exemption-- Illinois Central Railroad Company Pursuant to a written trackage rights agreement dated August 17, 2010, Illinois Central Railroad Company (IC) has agreed to grant overhead trackage rights to Norfolk Southern...

  12. 77 FR 20882 - Manning Grain Company; Acquisition and Operation Exemption; Fillmore Western Railway Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-06

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Manning Grain Company; Acquisition and Operation Exemption; Fillmore Western Railway Company Manning Grain Company (MGC), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to acquire...

  13. National Account Energy Alliance Final Report for the Basin Electric Project at Northern Border Pipeline Company's Compressor Station #7, North Dakota

    SciTech Connect

    Sweetzer, Richard; Leslie, Neil

    2008-02-01

    A field research test and verification project was conducted at the recovered energy generation plant at Northern Border Pipeline Company Compressor Station #7 (CS#7) near St. Anthony. Recovered energy generation plant equipment was supplied and installed by ORMAT Technologies, Inc. Basin Electric is purchasing the electricity under a purchase power agreement with an ORMAT subsidiary, which owns and operates the plant.

  14. 6. INTERIOR DETAIL OF CRUSHING PLANT (FEATURE 19), GROUND LEVEL, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. INTERIOR DETAIL OF CRUSHING PLANT (FEATURE 19), GROUND LEVEL, FACING SOUTH. REMAINS OF CONVEYOR BELT BETWEEN CRUSHING PLANT AND FINE ORE MILL (FEATURE 20) SHOWN IN CENTER OF PHOTOGRAPH. - Copper Canyon Camp of the International Smelting & Refining Company, Crushing Plant, Copper Canyon, Battle Mountain, Lander County, NV

  15. A Company News Show for the Community

    ERIC Educational Resources Information Center

    Hill, Bill

    1976-01-01

    General Telephone Company's "Quarterly Report" is a 30 minute film (produced every three months) to acquaint company employees with the professions and crafts needed in the telephone system and to introduce some of the people involved. The film is also distributed over local cable television. A budget is included. (Author/LS)

  16. 33 CFR 117.438 - Company Canal.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Company Canal. 117.438 Section 117.438 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES DRAWBRIDGE OPERATION REGULATIONS Specific Requirements Louisiana § 117.438 Company Canal. (a) The draw of...

  17. Why Should Companies Think about Women?

    ERIC Educational Resources Information Center

    Catalyst, New York, NY.

    Companies should think about women because women represent half the human resources available to them. Actually, the most productive response companies can make to women's presence in the workplace is the full assimilation of women into all areas and at all levels of corporate operations. Achieving full assimilation will require time, however.…

  18. 76 FR 61689 - Sutton Hydroelectric Company, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-05

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Sutton Hydroelectric Company, LLC Notice of Site Visit On February 6, 2008, Sutton Hydroelectric Company, LLC (Sutton Hydroelectric) filed a notice of intent and...

  19. Communication Needs of Fortune 500 Companies.

    ERIC Educational Resources Information Center

    Hagen, Suzanne J.

    Personnel directors of 42 Fortune 500 companies responded to a questionnaire designed to elicit information on (1) the predominant communication-related job titles in those companies, (2) which of those positions communication majors were qualified to fill, and (3) what academic preparations were most useful for such positions. All respondents…

  20. 24 CFR 3500.16 - Title companies.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Title companies. 3500.16 Section 3500.16 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued... DEVELOPMENT REAL ESTATE SETTLEMENT PROCEDURES ACT § 3500.16 Title companies. No seller of property that...

  1. 76 FR 62759 - 2011 Company Organization Survey

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-11

    ... Bureau of the Census 2011 Company Organization Survey AGENCY: Bureau of the Census, Commerce. ACTION... Organization Survey. The survey's data are needed, in part, to update the multilocation companies in the... will furnish report forms to organizations included in the survey, and additional copies are...

  2. 75 FR 71417 - 2010 Company Organization Survey

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-23

    ... Bureau of the Census 2010 Company Organization Survey AGENCY: Bureau of the Census, Commerce. ACTION... Organization Survey. The survey's data are needed, in part, to update the multilocation companies in the... will furnish report forms to organizations included in the survey, and additional copies are...

  3. 78 FR 64911 - 2013 Company Organization Survey

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-30

    ... Bureau of the Census 2013 Company Organization Survey AGENCY: Bureau of the Census, Commerce. ACTION... Organization Survey. The survey's data are needed, in part, to update the multilocation companies in the... will furnish report forms to organizations included in the survey, and additional copies are...

  4. Targeting a company's real core competencies.

    PubMed

    Snyder, A V; Ebeling, H W

    1992-01-01

    By recognizing its core competencies, a company can clearly define organizational boundaries and focus resources for maximum advantage. The authors outline an approach for identifying those competencies that can provide a company with the best chance to achieve long-term competitive advantage.

  5. Beyond empowerment: building a company of citizens.

    PubMed

    Manville, Brook; Ober, Josiah

    2003-01-01

    We live in a knowledge economy. The core assets of the modern business enterprise aren't its buildings, machinery, and real estate, but the intelligence, understanding, skills, and experience of its employees. Harnessing the capabilities and commitment of knowledge workers is arguably the central managerial challenge of our time. Unfortunately, it is a challenge that has not yet been met. Corporate ownership structures, governance systems, and incentive programs--despite the enlightened rhetoric of business leaders--remain firmly planted in the industrial age. In this article, the authors draw on history to lay out a model for a democratic business organization suited to the knowledge economy. Some 2,500 years ago, the city-state of ancient Athens rose to unprecedented political and economic power by giving its citizens a direct voice and an active role in civic governance. The city's uniquely participative system of democracy helped unleash the creativity of the Athenian people and channel it to produce the greatest good for society. The system succeeded in bringing individual initiative and common cause into harmony. And that is precisely the synthesis today's companies need to achieve if they're to realize the full power of their people and thrive in the knowledge economy. The Athenian model of organizational democracy is just that--a model. It does not provide a simple set of prescriptions for modern managers. What it offers is a window into how sizable groups of people can, in an atmosphere of dignity and trust, successfully govern themselves without resorting to a stifling bureaucracy.

  6. Beyond empowerment: building a company of citizens.

    PubMed

    Manville, Brook; Ober, Josiah

    2003-01-01

    We live in a knowledge economy. The core assets of the modern business enterprise aren't its buildings, machinery, and real estate, but the intelligence, understanding, skills, and experience of its employees. Harnessing the capabilities and commitment of knowledge workers is arguably the central managerial challenge of our time. Unfortunately, it is a challenge that has not yet been met. Corporate ownership structures, governance systems, and incentive programs--despite the enlightened rhetoric of business leaders--remain firmly planted in the industrial age. In this article, the authors draw on history to lay out a model for a democratic business organization suited to the knowledge economy. Some 2,500 years ago, the city-state of ancient Athens rose to unprecedented political and economic power by giving its citizens a direct voice and an active role in civic governance. The city's uniquely participative system of democracy helped unleash the creativity of the Athenian people and channel it to produce the greatest good for society. The system succeeded in bringing individual initiative and common cause into harmony. And that is precisely the synthesis today's companies need to achieve if they're to realize the full power of their people and thrive in the knowledge economy. The Athenian model of organizational democracy is just that--a model. It does not provide a simple set of prescriptions for modern managers. What it offers is a window into how sizable groups of people can, in an atmosphere of dignity and trust, successfully govern themselves without resorting to a stifling bureaucracy. PMID:12545922

  7. Platts top 250 global energy company rankings

    SciTech Connect

    Mullen, T.; Leonard, M.

    2005-12-01

    Revenues and profits for many firms surged last year over previous years. The turnaround from last year's global survey is dramatic. Asset- and revenue-rich integrated oil and gas companies dominate the top rungs of the 2005 Platts Top 250 Global Energy Company Rankings. The following industry segments were analyzed: diversified utilities; exploration and production; electric utilities; gas utilities; integrated oil and gas companies; refining and marketing; independent power producers; coal and consumable fuel companies and storage and transfer companies; The total combined revenue for the coal and consumable fuels sector was $74.7 billion. Leaders in this sector were: Yanzhou Coal Mining Co., CONSOl Energy Inc., Peabody Energy Corp., PT Bumi Resources Tbk, Cameco Corp., and Arch Coal. 14 tabs.

  8. Operation results of Wakamatsu PFBC plant

    SciTech Connect

    Nishioka, Toshio; Abe, Rikiya; Ogura, Yoshio; Hirai, Takeo

    1997-12-31

    Electric Power Development Company, EPDC, has operated 71MWe PFBC demonstration plant at Wakamatsu site to evaluate the system since 1994. Wakamatsu plant is the first PFBC plant in Japan, preceding the commercial plants such as Tomato-Azuma, Osaki and Karita. The plant is the world-wide first plant that is equipped with hot gas filter of 100% capacity. The authors have operated the plant for more than 6,000 hours with some troubles since the first generation in October, 1993. They acquired much information about operation and maintenance, so that they are convinced that PFBC is a promising power generation technology. They plan to operate the plant until the end of 1997, targeting 10,000 hour operation and establishment of the plant reliability.

  9. 31 CFR 223.16 - List of certificate holding companies.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 31 Money and Finance:Treasury 2 2013-07-01 2013-07-01 false List of certificate holding companies... WITH THE UNITED STATES § 223.16 List of certificate holding companies. A list of qualified companies is... submitted by a company, he shall, before issuing Department Circular 570, give a company due notice of...

  10. 31 CFR 223.16 - List of certificate holding companies.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 31 Money and Finance:Treasury 2 2011-07-01 2011-07-01 false List of certificate holding companies... WITH THE UNITED STATES § 223.16 List of certificate holding companies. A list of qualified companies is... submitted by a company, he shall, before issuing Department Circular 570, give a company due notice of...

  11. 31 CFR 223.16 - List of certificate holding companies.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 31 Money and Finance:Treasury 2 2012-07-01 2012-07-01 false List of certificate holding companies... WITH THE UNITED STATES § 223.16 List of certificate holding companies. A list of qualified companies is... submitted by a company, he shall, before issuing Department Circular 570, give a company due notice of...

  12. 31 CFR 223.16 - List of certificate holding companies.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 31 Money and Finance: Treasury 2 2014-07-01 2014-07-01 false List of certificate holding companies... WITH THE UNITED STATES § 223.16 List of certificate holding companies. A list of qualified companies is... submitted by a company, he shall, before issuing Department Circular 570, give a company due notice of...

  13. 78 FR 54691 - American General Life Insurance Company, et al.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-05

    ... COMMISSION American General Life Insurance Company, et al. August 29, 2013, AGENCY: The Securities and... Life Insurance Company (``American General''), The United States Life Insurance Company in the City of New York (``US Life'') (each, an ``Insurance Company'' and together, the ``Insurance Companies''),...

  14. 17 CFR 256.223 - Advances from associate companies.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... companies. 256.223 Section 256.223 Commodity and Securities Exchanges SECURITIES AND EXCHANGE COMMISSION (CONTINUED) UNIFORM SYSTEM OF ACCOUNTS FOR MUTUAL SERVICE COMPANIES AND SUBSIDIARY SERVICE COMPANIES, PUBLIC UTILITY HOLDING COMPANY ACT OF 1935 6. Long-Term Debt § 256.223 Advances from associate companies....

  15. 12 CFR 583.20 - Savings and loan holding company.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Savings and loan holding company. 583.20... REGULATIONS AFFECTING SAVINGS AND LOAN HOLDING COMPANIES § 583.20 Savings and loan holding company. The term savings and loan holding company means any company that directly or indirectly controls a...

  16. 12 CFR 575.3 - Mutual holding company reorganizations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Mutual holding company reorganizations. 575.3... COMPANIES § 575.3 Mutual holding company reorganizations. A mutual savings association may reorganize to become a mutual holding company, or join in a mutual holding company reorganization as an...

  17. 17 CFR 256.311 - Other service company property.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 17 Commodity and Securities Exchanges 3 2010-04-01 2010-04-01 false Other service company property... (CONTINUED) UNIFORM SYSTEM OF ACCOUNTS FOR MUTUAL SERVICE COMPANIES AND SUBSIDIARY SERVICE COMPANIES, PUBLIC UTILITY HOLDING COMPANY ACT OF 1935 Service Company Property Accounts § 256.311 Other service...

  18. 1. Photocopy of photograph, c. 1904. VIEW OF HONEYWOOD MILL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. Photocopy of photograph, c. 1904. VIEW OF HONEYWOOD MILL SETTLEMENT AT DAM 5, ORIGINALLY ERECTED AS A FLOUR MILL IN THE 1830s, CONVERTED TO A PULP GRINDING MILL IN THE 1880; HYDROELECTRIC GENERATING EQUIPMENT INSTALLED BY MARTINSBURG POWER COMPANY IN 1904. (Courtesy of the Potomac Edison Company Library (Hagerstown, MD), Historical Data Files, Dam No. 5 listing) - Dam No. 5 Hydroelectric Plant, On Potomac River, Hedgesville, Berkeley County, WV

  19. VIEW LOOKING WEST OF SINTERING PLANT, HEYL & PATTERSON CAR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW LOOKING WEST OF SINTERING PLANT, HEYL & PATTERSON CAR DUMPER AT BLAST FURNACE NO. 3, BLAST FURNACE NO. 1 ORE BRIDGE IN BACKGROUND. - Pittsburgh Steel Company, Monessen Works, Blast Furnace No. 3, Donner Avenue, Monessen, Westmoreland County, PA

  20. 2. VIEW NORTHEAST OF CONDENSER WATER INTAKE (LEFT), GENERATING PLANT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. VIEW NORTHEAST OF CONDENSER WATER INTAKE (LEFT), GENERATING PLANT AND STACK (CENTER), AND VIADUCT (EXTREME RIGHT) - Turners Falls Power & Electric Company, Hampden Station, East bank of Connecticut River, Chicopee, Hampden County, MA

  1. 9. FERTILIZER PLANT AND STORAGE BUILDINGS, LOOKING EAST FROM BUILDING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. FERTILIZER PLANT AND STORAGE BUILDINGS, LOOKING EAST FROM BUILDING 149; LIVESTOCK HOLDING BUILDINGS (HOG AND SHEEP HOTELS) OCCUPIED OPEN AREA IN FOREGROUND - Rath Packing Company, Sycamore Street between Elm & Eighteenth Streets, Waterloo, Black Hawk County, IA

  2. Disability as diversity in Fortune 100 companies.

    PubMed

    Ball, Phoebe; Monaco, Gregory; Schmeling, James; Schartz, Helen; Blanck, Peter

    2005-01-01

    To investigate the inclusion of people with disabilities in the diversity policies of the most successful businesses in the United States, we examined the publicly available workforce and supplier diversity policies of the top 100 companies on Fortune Magazine's 2003 list of the 500 most profitable companies in the nation. The majority of these companies have extensive information about their diversity policies and practices available on their corporate website. The information was used to categorize the policies into those that include people with disabilities, do not define diversity, and enumerate what is meant by diversity (e.g. in terms of race or gender) but do not expressly mention disability. In addition, we looked beyond the diversity policies to information available on corporate websites relating to a variety of diversity initiatives. Findings suggest that the majority of the companies that top the Fortune 500 list have developed and implemented diversity policies. Of these, 42% have diversity policies that include people with disabilities in the definition of a diverse workforce. Furthermore, 47% of companies with workplace diversity policies discuss diversity in a way that neither expressly includes nor excludes people with disabilities. Far fewer (15%) supplier diversity policies include disability in the definition of diversity, but a significant number of companies use criteria that allow a business owner with a disability to benefit from the company's supplier diversity program. PMID:15706604

  3. Disability as diversity in Fortune 100 companies.

    PubMed

    Ball, Phoebe; Monaco, Gregory; Schmeling, James; Schartz, Helen; Blanck, Peter

    2005-01-01

    To investigate the inclusion of people with disabilities in the diversity policies of the most successful businesses in the United States, we examined the publicly available workforce and supplier diversity policies of the top 100 companies on Fortune Magazine's 2003 list of the 500 most profitable companies in the nation. The majority of these companies have extensive information about their diversity policies and practices available on their corporate website. The information was used to categorize the policies into those that include people with disabilities, do not define diversity, and enumerate what is meant by diversity (e.g. in terms of race or gender) but do not expressly mention disability. In addition, we looked beyond the diversity policies to information available on corporate websites relating to a variety of diversity initiatives. Findings suggest that the majority of the companies that top the Fortune 500 list have developed and implemented diversity policies. Of these, 42% have diversity policies that include people with disabilities in the definition of a diverse workforce. Furthermore, 47% of companies with workplace diversity policies discuss diversity in a way that neither expressly includes nor excludes people with disabilities. Far fewer (15%) supplier diversity policies include disability in the definition of diversity, but a significant number of companies use criteria that allow a business owner with a disability to benefit from the company's supplier diversity program.

  4. State oil companies have diverse strategies

    SciTech Connect

    Not Available

    1994-08-29

    The Journal's series on state-owned oil companies continues with profiles on seven more companies which already are, or could be, important players in the international oil industry. The first part of this series appeared last August. It featured the world's producing giants. This installment shows that national oil companies are definitely not cut from the same mold and that they have diverse mandates from their countries or have developed unusual niches in the oil world. The objective of these profiles is not to fully cover the plans and performance of such companies. That is done regularly in weekly editions of OGJ. Rather, these articles are written by a team of experienced Journal editors to characterize the individual companies, describe their mandates and organization, and present some professional background information, when available, on those in top management with the hope of getting some insight into the corporate cultures. The companies covered come from Brazil, China, Finland, Japan, Norway, Oman, and Vietnam. In addition the article profiles Borealis Holding A/S, created from the merger of two state companies from Norway and Finland.

  5. Your company's secret change agents.

    PubMed

    Pascale, Richard Tanner; Sternin, Jerry

    2005-05-01

    Organizational change has traditionally come about through top-down initiatives such as hiring experts or importing best-of-breed practices. Such methods usually result in companywide rollouts of templates mandated from on high. These do little to get people excited. But within every organization, there are a few individuals who find unique ways to look at problems that seem impossible to solve. Although these change agents start out with the same tools and access to resources as their peers, they are able to see solutions where others do not. They find a way to bridge the divide between what is happening and what is possible. These positive deviants are the key, the authors believe, to a better way of creating organizational change. Your company can make the most of their methods by following six steps. In Step 1, Make the group the guru, the members of the community are engaged in the process of their own evolution. Step 2, Reframe through facts, entails restating the problem in a way that opens minds to new possibilities. Step 3, Make it safe to learn, involves creating an environment that supports innovative ideas. In Step 4, Make the problem concrete, the community combats abstraction by stating uncomfortable truths. In Step 5, Leverage social proof, the community looks to the larger society for examples of solutions that have worked in parallel situations. In Step 6, Confound the immune defense response, solutions are introduced organically from within the group in a way that promotes acceptance. Throughout the steps, the leader must suspend his or her traditional role in favor of more facilitatory practices. The positive-deviance approach has unearthed solutions to such complicated and diverse problems as malnutrition in Mali and human trafficking in East Java. This methodology can help solve even the most extreme dilemmas.

  6. Your company's secret change agents.

    PubMed

    Pascale, Richard Tanner; Sternin, Jerry

    2005-05-01

    Organizational change has traditionally come about through top-down initiatives such as hiring experts or importing best-of-breed practices. Such methods usually result in companywide rollouts of templates mandated from on high. These do little to get people excited. But within every organization, there are a few individuals who find unique ways to look at problems that seem impossible to solve. Although these change agents start out with the same tools and access to resources as their peers, they are able to see solutions where others do not. They find a way to bridge the divide between what is happening and what is possible. These positive deviants are the key, the authors believe, to a better way of creating organizational change. Your company can make the most of their methods by following six steps. In Step 1, Make the group the guru, the members of the community are engaged in the process of their own evolution. Step 2, Reframe through facts, entails restating the problem in a way that opens minds to new possibilities. Step 3, Make it safe to learn, involves creating an environment that supports innovative ideas. In Step 4, Make the problem concrete, the community combats abstraction by stating uncomfortable truths. In Step 5, Leverage social proof, the community looks to the larger society for examples of solutions that have worked in parallel situations. In Step 6, Confound the immune defense response, solutions are introduced organically from within the group in a way that promotes acceptance. Throughout the steps, the leader must suspend his or her traditional role in favor of more facilitatory practices. The positive-deviance approach has unearthed solutions to such complicated and diverse problems as malnutrition in Mali and human trafficking in East Java. This methodology can help solve even the most extreme dilemmas. PMID:15929405

  7. 26 CFR 1.831-3 - Tax on insurance companies (other than life or mutual), mutual marine insurance companies, mutual...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Companies § 1.831-3 Tax on insurance companies (other than life or mutual), mutual marine insurance... 26 Internal Revenue 8 2013-04-01 2013-04-01 false Tax on insurance companies (other than life or mutual), mutual marine insurance companies, mutual fire insurance companies issuing perpetual...

  8. 26 CFR 1.831-1 - Tax on insurance companies (other than life or mutual), mutual marine insurance companies, and...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... insurance companies (other than life or mutual), mutual marine insurance companies, and mutual fire... 26 Internal Revenue 8 2012-04-01 2012-04-01 false Tax on insurance companies (other than life or mutual), mutual marine insurance companies, and mutual fire insurance companies issuing...

  9. 26 CFR 1.831-3 - Tax on insurance companies (other than life or mutual), mutual marine insurance companies, mutual...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Companies § 1.831-3 Tax on insurance companies (other than life or mutual), mutual marine insurance... 26 Internal Revenue 8 2012-04-01 2012-04-01 false Tax on insurance companies (other than life or mutual), mutual marine insurance companies, mutual fire insurance companies issuing perpetual...

  10. 26 CFR 1.831-1 - Tax on insurance companies (other than life or mutual), mutual marine insurance companies, and...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... insurance companies (other than life or mutual), mutual marine insurance companies, and mutual fire... 26 Internal Revenue 8 2013-04-01 2013-04-01 false Tax on insurance companies (other than life or mutual), mutual marine insurance companies, and mutual fire insurance companies issuing...

  11. 26 CFR 1.831-1 - Tax on insurance companies (other than life or mutual), mutual marine insurance companies, and...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... insurance companies (other than life or mutual), mutual marine insurance companies, and mutual fire... 26 Internal Revenue 8 2011-04-01 2011-04-01 false Tax on insurance companies (other than life or mutual), mutual marine insurance companies, and mutual fire insurance companies issuing...

  12. 26 CFR 1.831-3 - Tax on insurance companies (other than life or mutual), mutual marine insurance companies, mutual...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Companies § 1.831-3 Tax on insurance companies (other than life or mutual), mutual marine insurance... 26 Internal Revenue 8 2014-04-01 2014-04-01 false Tax on insurance companies (other than life or mutual), mutual marine insurance companies, mutual fire insurance companies issuing perpetual...

  13. 26 CFR 1.831-3 - Tax on insurance companies (other than life or mutual), mutual marine insurance companies, mutual...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Companies § 1.831-3 Tax on insurance companies (other than life or mutual), mutual marine insurance... 26 Internal Revenue 8 2011-04-01 2011-04-01 false Tax on insurance companies (other than life or mutual), mutual marine insurance companies, mutual fire insurance companies issuing perpetual...

  14. 26 CFR 1.831-1 - Tax on insurance companies (other than life or mutual), mutual marine insurance companies, and...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... companies (other than life or mutual), mutual marine insurance companies, and mutual fire insurance companies issuing perpetual policies. (a) All insurance companies, other than life or mutual or foreign... 26 Internal Revenue 8 2010-04-01 2010-04-01 false Tax on insurance companies (other than life...

  15. 26 CFR 1.831-3 - Tax on insurance companies (other than life or mutual), mutual marine insurance companies, mutual...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 26 Internal Revenue 8 2010-04-01 2010-04-01 false Tax on insurance companies (other than life or mutual), mutual marine insurance companies, mutual fire insurance companies issuing perpetual policies...-3 Tax on insurance companies (other than life or mutual), mutual marine insurance companies,...

  16. 10 CFR 500.3 - Electric regions-electric region groupings for reliability measurements under the Powerplant and...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Edison Company, Duquesne Light Company. 14. Cincinnati, Columbus, Dayton Group (CCD)—Cincinnati Gas and Electric Company, Columbus and Southern Ohio Electric Company, Dayton Power and Light Company. 15....

  17. 10 CFR 500.3 - Electric regions-electric region groupings for reliability measurements under the Powerplant and...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Edison Company, Duquesne Light Company. 14. Cincinnati, Columbus, Dayton Group (CCD)—Cincinnati Gas and Electric Company, Columbus and Southern Ohio Electric Company, Dayton Power and Light Company. 15....

  18. 10 CFR 500.3 - Electric regions-electric region groupings for reliability measurements under the Powerplant and...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Edison Company, Duquesne Light Company. 14. Cincinnati, Columbus, Dayton Group (CCD)—Cincinnati Gas and Electric Company, Columbus and Southern Ohio Electric Company, Dayton Power and Light Company. 15....

  19. Blue Heron Paper Company: Oregon Mill Uses Model-Based Energy Assessment to Identify Energy and Cost Savings Opportunities

    SciTech Connect

    2004-04-01

    Blue Heron Paper Company conducted a model-based energy assessment (MEA) to determine how to reduce effluent flow and heat load, minimize fresh water, and reduce process energy use at the company's Oregon City, Oregon, paper mill. Assessment staff recommended 15 projects, 7 of which the company considered. These projects would save an estimated 608,161 million British thermal units per year in natural gas and 990 kilowatt hours per year in electricity. Corresponding annual cost savings would be about $2.9 million per year. Furthermore, by reducing fuel requirements for the plant steam system, Blue Heron would also reduce stack gas emissions.

  20. Blue Heron Paper Company: Oregon Mill Uses Model-Based Energy Assessment to Identify Energy and Cost Savings Opportunities (Revision)

    SciTech Connect

    Not Available

    2004-04-01

    Blue Heron Paper Company conducted a model-based energy assessment (MEA) to determine how to reduce effluent flow and heat load, minimize fresh water, and reduce process energy use at the company's Oregon City, Oregon, paper mill. Assessment staff recommended 15 projects, 7 of which the company considered. These projects would save an estimated 608,161 million British thermal units per year in natural gas and 990 kilowatt hours per year in electricity. Corresponding annual cost savings would be about $2.9 million per year. Furthermore, by reducing fuel requirements for the plant steam system, Blue Heron would also reduce stack gas emissions.

  1. Section drawing of Boydentype turbine by Holyoke Machine Company; photocopy ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Section drawing of Boyden-type turbine by Holyoke Machine Company; photocopy from Illustrated Catalog of the Holyoke Machine Company, Holyoke, Massachusetts, 1876. - Harmony Manufacturing Company, Mill Number 3, 100 North Mohawk Street, Cohoes, Albany County, NY

  2. Elevation drawing of Boydentype turbine by Holyoke Machine Company; photocopy ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Elevation drawing of Boyden-type turbine by Holyoke Machine Company; photocopy from Illustrated Catalog of the Holyoke Machine Company, Holyoke, Massachusetts, 1876. - Harmony Manufacturing Company, Mill Number 3, 100 North Mohawk Street, Cohoes, Albany County, NY

  3. Company finds emerging niche for its global-rescue business

    PubMed Central

    Kent, Heather

    1996-01-01

    A Singapore-based company with a subsidiary office in Seattle offers emergency medical assistance to employees of North American companies operating in Asia and South America. The company offers routine medical service and emergency evacuation around the clock.

  4. Considering Plants.

    ERIC Educational Resources Information Center

    Flannery, Maura C.

    1991-01-01

    Examples from research that incorporate plants to illustrate biological principles are presented. Topics include dried pea shape, homeotic genes, gene transcription in plants that are touched or wounded, production of grasslands, seaweed defenses, migrating plants, camouflage, and family rivalry. (KR)

  5. An approach to the implementation of ISO 14000 at a shipping company

    NASA Astrophysics Data System (ADS)

    Panaitescu, F. V.; Panaitescu, M.

    2015-11-01

    We present here a successful implementation of the Environmental Management System (EMS) in a shipping company. The EMS of the each company must be revised and expanded and new analytical requirements included in it. This new EMS concept is available to everyone on board and must be studied by every seafarer. All environmental requirements to be strictly followed all over the world. The main points of new EMS are: new open reporting system, environmental tag system (ETS) which introduce non re-usable numbered seals, pollution prevention equipment (OWS, OCM, Incinerator and Sewage Treatment Plant), the environmental defect reports system - extraordinary E/R operations and leakages log book.

  6. Oil company financial analysis in mechanical language

    SciTech Connect

    Johnston, D.A.

    1992-01-01

    Explains financial concepts affecting the petroleum industry. Discusses mergers, restructuring, the financial roles of managers and shareholders, and forces that influence stock values. Shows how to read an oil company annual report.

  7. Training for Information Management in a Company.

    ERIC Educational Resources Information Center

    Karivalo, Merja

    1989-01-01

    Argues that information resource management is an established philosophy that needs to be linked to human resources management and strategic planning in industrial companies. A training program for information management is presented, including training objectives, participants, contents, and structure. (CLB)

  8. Drug companies, UNAIDS make drugs available.

    PubMed

    1998-01-01

    The United Nations AIDS (UNAIDS) initiative is working with several drug companies and four countries on a pilot program to build a health infrastructure that provides affordable drugs to insure that combination therapies are used appropriately. The countries involved in the program are Uganda, Chile, Vietnam and Cote d'Ivoire, and the drug companies are Glaxo Wellcome, Hoffmann-La Roche, and Virco NV. Each country agreed to form national HIV/AIDS drug advisory boards, and non-profit companies will act as clearinghouses. Financing will come from the pharmaceutical companies, local health ministries, and a $1 million grant from UNAIDS. The program will be evaluated in terms of improvements to overall health care delivery, number of people treated, the impact on emergency care, and the rate of illness and death.

  9. Utility Companies First Year in NABS Program

    ERIC Educational Resources Information Center

    Recchia, Louis

    1970-01-01

    An evaluative survey of cooperative disadvantaged training by business and government in 11 gas and electric companies associated with the National Alliance of Businessmen (NAB). Questionnaire; five tables. (LY)

  10. Drunk as The Company You Keep?

    MedlinePlus

    ... 160964.html Drunk as the Company You Keep? Perceptions of your intoxication influenced by how much those ... that serve alcohol. They found that the drinkers' perceptions of their level of drunkenness and the associated ...

  11. A virtual company concept for reservoir management

    SciTech Connect

    Martin, F.D.; Kendall, R.P.; Whitney, E.M.

    1998-12-31

    This paper describes how reservoir management problems were pursued with a virtual company concept via the Internet and World Wide Web. The focus of the paper is on the implementation of virtual asset management teams that were assembled with small independent oil companies. The paper highlights the mechanics of how the virtual team transferred data and interpretations, evaluated geological models of complex reservoirs, and used results of simulation studies to analyze various reservoir management strategies.

  12. Cogen plant sets new technical -- and business -- standards

    SciTech Connect

    1995-04-01

    This article describes how the Independence station recently completed by New York City-based Sithe Energies Inc on the outskirts of Oswego, NY, exemplifies the new technical and business achievements possible in an entrepreneurial environment. Fulfilling the promise of its name, the 1,000-MW, gas-fired combined-cycle plant produces and sells 40MW of electricity to the adjacent facilities of Alcan Rolled Products Inc -- a manufacturer of aluminum sheets for beverage cans -- at half the price charged by Niagara Mohawk Power Corp (NiMo). Built in less than two years at a cost of $800-million, Independence also supplies Alcan with 1.6-billion lb/yr of steam, adds its remaining 960 MW of capacity to the transmission grids of NiMo and Consolidated Edison Co of New York Inc, and operates with very little impact on the environment. NO{sub x} emissions from the plant are among the lowest in the country -- indeed the world.

  13. Shoreham Nuclear Power Plant

    SciTech Connect

    1992-12-31

    The United States Supreme Court, with PG&E and Silkwood, and in the eight years since, has expanded the acceptable extent of state regulation of commercial nuclear power plants. In PG&E, the Court established the acceptability of state regulation that purports to be concerned with the non-radiological aspects of nuclear plant operations but that, as a practical matter, is concerned with their radiological hazards. In Silkwood, the Court established the acceptability of state regulation of radiological hazards when its impact on federal regulation of radiological hazards is indirect and incidental. Finally, in Goodyear and English, the Court confirmed and elaborated on such state regulation. Subject to political demands either for additional involvement in commercial nuclear power plant regulation or from political interests opposed altogether to nuclear power, some states, in the 1980s, sought to expand even further the involvement of state and local governments in nuclear plant regulation. Indeed, some states sought and in some instances acquired, through innovative and extraordinary means, a degree of involvement in the regulation of radiological hazards that seriously erodes and undermines the role of the federal government in such regulation. In particular, the State of New York concluded with the Long Island Lighting Company (LILCO), in February 1989, an agreement for the purchase of New York of the Shoreham nuclear power plant on Long Island. A response to failed efforts by New York to prevent the issuance by the NRC of a license to LILCO to operate the plant, the agreement was concluded to allow New York to close the plant either altogether or to convert it to a fossil fuel facility. The opposition to the sale of Shoreham is discussed.

  14. The theater management model of plant memory

    PubMed Central

    Norris, Vic; Ripoll, Camille; Thellier, Michel

    2015-01-01

    The existence of a memory in plants raises several fundamental questions. What might be the function of a plant memory? How might it work? Which molecular mechanisms might be responsible? Here, we sketch out the landscape of plant memory with particular reference to the concepts of functioning-dependent structures and competitive coherence. We illustrate how these concepts might be relevant with reference to the metaphor of a traveling, avant-garde theater company and we suggest how using a program that simulates competitive coherence might help answer some of the questions about plant memory. PMID:25482789

  15. Tampa Electric Company Polk Power Station IGCC project: Project status

    SciTech Connect

    McDaniel, J.E.; Carlson, M.R.; Hurd, R.; Pless, D.E.; Grant, M.D.

    1997-12-31

    The Tampa Electric Company Polk Power Station is a nominal 250 MW (net) Integrated Gasification Combined Cycle (IGCC) power plant located to the southeast of Tampa, Florida in Polk County, Florida. This project is being partially funded under the Department of Energy`s Clean Coal Technology Program pursuant to a Round II award. The Polk Power Station uses oxygen-blown, entrained-flow IGCC technology licensed from Texaco Development Corporation to demonstrate significant reductions of SO{sub 2} and NO{sub x} emissions when compared to existing and future conventional coal-fired power plants. In addition, this project demonstrates the technical feasibility of commercial scale IGCC and Hot Gas Clean Up (HGCU) technology. The Polk Power Station achieved ``first fire`` of the gasification system on schedule in mid-July, 1996. Since that time, significant advances have occurred in the operation of the entire IGCC train. This paper addresses the operating experiences which occurred in the start-up and shakedown phase of the plant. Also, with the plant being declared in commercial operation as of September 30, 1996, the paper discusses the challenges encountered in the early phases of commercial operation. Finally, the future plans for improving the reliability and efficiency of the Unit in the first quarter of 1997 and beyond, as well as plans for future alternate fuel test burns, are detailed. The presentation features an up-to-the-minute update on actual performance parameters achieved by the Polk Power Station. These parameters include overall Unit capacity, heat rate, and availability. In addition, the current status of the start-up activities for the HGCU portion of the plant is discussed.

  16. Divergent Vegetation Growth Patterns Relative to Bioinfiltration Unit Size and Plant Placement

    EPA Science Inventory

    In 2009, the U.S. Environmental Protection Agency constructed six experimental bioinfiltration units at the Edison Environmental Center in Edison, New Jersey. They were designed as two sets of three bioinfiltration units with drainage area to surface area ratios of 5.5:1, 11:1, ...

  17. 76 FR 56191 - Notice of Application; ANR Pipeline Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-12

    ... Energy Regulatory Commission Notice of Application; ANR Pipeline Company Take notice that on August 23, 2011, ANR Pipeline Company (ANR), 717 Texas Street, Houston, Texas 77002-2761, filed in the above... Wisconsin Electric Power Company, et al. v. ANR Pipeline Company, 136 FERC ] 61,080 (2011). Any...

  18. 26 CFR 1.543-1 - Personal holding company income.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 26 Internal Revenue 7 2010-04-01 2010-04-01 true Personal holding company income. 1.543-1 Section... (CONTINUED) INCOME TAXES (CONTINUED) Personal Holding Companies § 1.543-1 Personal holding company income. (a) General rule. The term personal holding company income means the portion of the gross income...

  19. 26 CFR 1.954-1 - Foreign base company income.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 26 Internal Revenue 10 2011-04-01 2011-04-01 false Foreign base company income. 1.954-1 Section 1... (CONTINUED) INCOME TAXES (CONTINUED) Controlled Foreign Corporations § 1.954-1 Foreign base company income... computing the foreign base company income of a controlled foreign corporation. Foreign base company...

  20. 26 CFR 1.954-1 - Foreign base company income.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 26 Internal Revenue 10 2014-04-01 2013-04-01 true Foreign base company income. 1.954-1 Section 1... (CONTINUED) INCOME TAXES (CONTINUED) Controlled Foreign Corporations § 1.954-1 Foreign base company income... computing the foreign base company income of a controlled foreign corporation. Foreign base company...