Sample records for electric reliability plan

  1. 76 FR 73608 - Reliability Technical Conference, North American Electric Reliability Corporation, Public Service...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-29

    ... or municipal authority play in forming your bulk power system reliability plans? b. Do you support..., North American Electric Reliability Corporation (NERC) Nick Akins, CEO of American Electric Power (AEP..., EL11-62-000] Reliability Technical Conference, North American Electric Reliability Corporation, Public...

  2. 77 FR 53884 - Automatic Underfrequency Load Shedding and Load Shedding Plans Reliability Standards; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-04

    ... Underfrequency Load Shedding and Load Shedding Plans Reliability Standards; Notice of Compliance Filing Take notice that on August 9, 2012, North American Electric Reliability Corporation submitted a compliance... Load Shedding Plans Reliability Standards, 139 FERC ] 61,098, (Order No. 763) (2012). Any person...

  3. Electric service reliability cost/worth assessment in a developing country

    NASA Astrophysics Data System (ADS)

    Pandey, Mohan Kumar

    Considerable work has been done in developed countries to optimize the reliability of electric power systems on the basis of reliability cost versus reliability worth. This has yet to be considered in most developing countries, where development plans are still based on traditional deterministic measures. The difficulty with these criteria is that they cannot be used to evaluate the economic impacts of changing reliability levels on the utility and the customers, and therefore cannot lead to an optimum expansion plan for the system. The critical issue today faced by most developing countries is that the demand for electric power is high and growth in supply is constrained by technical, environmental, and most importantly by financial impediments. Many power projects are being canceled or postponed due to a lack of resources. The investment burden associated with the electric power sector has already led some developing countries into serious debt problems. This thesis focuses on power sector issues facing by developing countries and illustrates how a basic reliability cost/worth approach can be used in a developing country to determine appropriate planning criteria and justify future power projects by application to the Nepal Integrated Electric Power System (NPS). A reliability cost/worth based system evaluation framework is proposed in this thesis. Customer surveys conducted throughout Nepal using in-person interviews with approximately 2000 sample customers are presented. The survey results indicate that the interruption cost is dependent on both customer and interruption characteristics, and it varies from one location or region to another. Assessments at both the generation and composite system levels have been performed using the customer cost data and the developed NPS reliability database. The results clearly indicate the implications of service reliability to the electricity consumers of Nepal, and show that the reliability cost/worth evaluation is both possible and practical in a developing country. The average customer interruption costs of Rs 35/kWh at Hierarchical Level I and Rs 26/kWh at Hierarchical Level II evaluated in this research work led to an optimum reserve margin of 7.5%, which is considerably lower than the traditional reserve margin of 15% used in the NPS. A similar conclusion may result in other developing countries facing difficulties in power system expansion planning using the traditional approach. A new framework for system planning is therefore recommended for developing countries which would permit an objective review of the traditional system planning approach, and the evaluation of future power projects using a new approach based on fundamental principles of power system reliability and economics.

  4. The Future of Electricity Resource Planning

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kahrl, Fredrich; Mills, Andrew; Lavin, Luke

    Electricity resource planning is the process of identifying longer-term investments to meet electricity reliability requirements and public policy goals at a reasonable cost. Resource planning processes provide a forum for regulators, electric utilities, and electricity industry stakeholders to evaluate the economic, environmental, and social benefits and costs of different investment options. By facilitating a discussion on future goals, challenges and strategies, resource planning processes often play an important role in shaping utility business decisions. Resource planning emerged more than three decades ago in an era of transition, where declining electricity demand and rising costs spurred fundamental changes in electricity industrymore » regulation and structure. Despite significant changes in the industry, resource planning continues to play an important role in supporting investment decision making. Over the next two decades, the electricity industry will again undergo a period of transition, driven by technological change, shifting customer preferences and public policy goals. This transition will bring about a gradual paradigm shift in resource planning, requiring changes in scope, approaches and methods. Even as it changes, resource planning will continue to be a central feature of the electricity industry. Its functions — ensuring the reliability of high voltage (“bulk”) power systems, enabling oversight of regulated utilities and facilitating low-cost compliance with public policy goals — are likely to grow in importance as the electricity industry enters a new period of technological, economic and regulatory change. This report examines the future of electricity resource planning in the context of a changing electricity industry. The report examines emerging issues and evolving practices in five key areas that will shape the future of resource planning: (1) central-scale generation, (2) distributed generation, (3) demand-side resources, (4) transmission and (5) uncertainty and risk management. The analysis draws on a review of recent resource plans for 10 utilities that reflect some of the U.S. electricity industry’s extensive diversity.« less

  5. 18 CFR 39.4 - Funding of the Electric Reliability Organization.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... business plan and organization chart, explaining the proposed collection of all dues, fees and charges and... budget and business plan no later than sixty (60) days in advance of the beginning of the Electric... Organization may include in the application a plan for a transitional funding mechanism that would allow such...

  6. Basic Principles of Electrical Network Reliability Optimization in Liberalised Electricity Market

    NASA Astrophysics Data System (ADS)

    Oleinikova, I.; Krishans, Z.; Mutule, A.

    2008-01-01

    The authors propose to select long-term solutions to the reliability problems of electrical networks in the stage of development planning. The guide lines or basic principles of such optimization are: 1) its dynamical nature; 2) development sustainability; 3) integrated solution of the problems of network development and electricity supply reliability; 4) consideration of information uncertainty; 5) concurrent consideration of the network and generation development problems; 6) application of specialized information technologies; 7) definition of requirements for independent electricity producers. In the article, the major aspects of liberalized electricity market, its functions and tasks are reviewed, with emphasis placed on the optimization of electrical network development as a significant component of sustainable management of power systems.

  7. Selenide isotope generator for the Galileo mission. Reliability program plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1978-10-01

    The reliability program plan for the Selenide Isotope Generator (SIG) program is presented. It delineates the specific tasks that will be accomplished by Teledyne Energy Systems and its suppliers during design, development, fabrication and test of deliverable Radioisotopic Thermoelectric Generators (RTG), Electrical Heated Thermoelectric Generators (ETG) and associated Ground Support Equipment (GSE). The Plan is formulated in general accordance with procedures specified in DOE Reliability Engineering Program Requirements Publication No. SNS-2, dated June 17, 1974. The Reliability Program Plan presented herein defines the total reliability effort without further reference to Government Specifications. The reliability tasks to be accomplished are delineatedmore » herein and become the basis for contract compliance to the extent specified in the SIG contract Statement of Work.« less

  8. Bridging Climate Change Resilience and Mitigation in the Electricity Sector Through Renewable Energy and Energy Efficiency: Emerging Climate Change and Development Topics for Energy Sector Transformation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cox, Sarah L; Hotchkiss, Elizabeth L; Bilello, Daniel E

    Reliable, safe, and secure electricity is essential for economic and social development and a necessary input for many sectors of the economy. However, electricity generation and associated processes make up a significant portion of global greenhouse gas (GHG) emissions contributing to climate change. Furthermore, electricity systems are vulnerable to climate change impacts - both short-term events and changes over the longer term. This vulnerability presents both near-term and chronic challenges in providing reliable, affordable, equitable, and sustainable energy services. Within this context, developing countries face a number of challenges in the energy sector, including the need to reliably meet growingmore » electricity demand, lessen dependence on imported fuels, expand energy access, and improve stressed infrastructure for fuel supply and electricity transmission. Energy efficiency (EE) and renewable energy (RE) technical solutions described in this paper can bridge action across climate change mitigation and resilience through reducing GHG emissions and supporting electric power sector adaptation to increasing climate risk. Integrated planning approaches, also highlighted in this paper, play an integral role in bringing together mitigation and resilience action under broader frameworks. Through supporting EE and RE deployment and integrated planning approaches, unique to specific national and local circumstances, countries can design and implement policies, strategies, and sectoral plans that unite development priorities, climate change mitigation, and resilience.« less

  9. 18 CFR 375.303 - Delegations to the Director of the Office of Electric Reliability.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... uncontested contingency plans regarding shortages of electric energy or capacity, circumstances which may result in such shortages, and accommodations of any such shortages or circumstances, if said contingency... Commission, if the filings comply with the terms of the waivers; (ii) Reject a contingency plan regarding...

  10. Bulk electric system reliability evaluation incorporating wind power and demand side management

    NASA Astrophysics Data System (ADS)

    Huang, Dange

    Electric power systems are experiencing dramatic changes with respect to structure, operation and regulation and are facing increasing pressure due to environmental and societal constraints. Bulk electric system reliability is an important consideration in power system planning, design and operation particularly in the new competitive environment. A wide range of methods have been developed to perform bulk electric system reliability evaluation. Theoretically, sequential Monte Carlo simulation can include all aspects and contingencies in a power system and can be used to produce an informative set of reliability indices. It has become a practical and viable tool for large system reliability assessment technique due to the development of computing power and is used in the studies described in this thesis. The well-being approach used in this research provides the opportunity to integrate an accepted deterministic criterion into a probabilistic framework. This research work includes the investigation of important factors that impact bulk electric system adequacy evaluation and security constrained adequacy assessment using the well-being analysis framework. Load forecast uncertainty is an important consideration in an electrical power system. This research includes load forecast uncertainty considerations in bulk electric system reliability assessment and the effects on system, load point and well-being indices and reliability index probability distributions are examined. There has been increasing worldwide interest in the utilization of wind power as a renewable energy source over the last two decades due to enhanced public awareness of the environment. Increasing penetration of wind power has significant impacts on power system reliability, and security analyses become more uncertain due to the unpredictable nature of wind power. The effects of wind power additions in generating and bulk electric system reliability assessment considering site wind speed correlations and the interactive effects of wind power and load forecast uncertainty on system reliability are examined. The concept of the security cost associated with operating in the marginal state in the well-being framework is incorporated in the economic analyses associated with system expansion planning including wind power and load forecast uncertainty. Overall reliability cost/worth analyses including security cost concepts are applied to select an optimal wind power injection strategy in a bulk electric system. The effects of the various demand side management measures on system reliability are illustrated using the system, load point, and well-being indices, and the reliability index probability distributions. The reliability effects of demand side management procedures in a bulk electric system including wind power and load forecast uncertainty considerations are also investigated. The system reliability effects due to specific demand side management programs are quantified and examined in terms of their reliability benefits.

  11. Ensuring reliability in expansion schemes.

    PubMed

    Kamal-Uddin, Abu Sayed; Williams, Donald Leigh

    2005-01-01

    Existing electricity power supplies must serve, or be adapted to serve, the expansion of hospital buildings. With the existing power supply assets of many hospitals being up to 20 years old, assessing the security and reliability of the power system must be given appropriate priority to avoid unplanned outages due to overloads and equipment failures. It is imperative that adequate contingency is planned for essential and non-essential electricity circuits. This article describes the methodology undertaken, and the subsequent recommendations that were made, when evaluating the security and reliability of electricity power supplies to a number of major London hospitals. The methodology described aligns with the latest issue of NHS Estates HTM 2011 'Primary Electrical Infrastructure Emergency Electrical Services Design Guidance' (to which ERA Technology has contributed).

  12. Cell emulation and preliminary results.

    DOT National Transportation Integrated Search

    2016-07-01

    This report details preliminary results of the testing plan implemented by the Hawaii Natural Energy Institute to evaluate Electric Vehicle (EV) battery durability and reliability under electric utility grid operations. Commercial EV battery cells ar...

  13. An adequacy-constrained integrated planning method for effective accommodation of DG and electric vehicles in smart distribution systems

    NASA Astrophysics Data System (ADS)

    Tan, Zhukui; Xie, Baiming; Zhao, Yuanliang; Dou, Jinyue; Yan, Tong; Liu, Bin; Zeng, Ming

    2018-06-01

    This paper presents a new integrated planning framework for effective accommodating electric vehicles in smart distribution systems (SDS). The proposed method incorporates various investment options available for the utility collectively, including distributed generation (DG), capacitors and network reinforcement. Using a back-propagation algorithm combined with cost-benefit analysis, the optimal network upgrade plan, allocation and sizing of the selected components are determined, with the purpose of minimizing the total system capital and operating costs of DG and EV accommodation. Furthermore, a new iterative reliability test method is proposed. It can check the optimization results by subsequently simulating the reliability level of the planning scheme, and modify the generation reserve margin to guarantee acceptable adequacy levels for each year of the planning horizon. Numerical results based on a 32-bus distribution system verify the effectiveness of the proposed method.

  14. 75 FR 26745 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-12

    ... of October 15, 2009 Order on 2010 Business Plans and Budgets. Filed Date: 05/03/2010. Accession... Electric Reliability Corporation for Approval of Amended 2010 Business Plan and Budget of Western...

  15. CERTS: Consortium for Electric Reliability Technology Solutions - Research Highlights

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Eto, Joseph

    2003-07-30

    Historically, the U.S. electric power industry was vertically integrated, and utilities were responsible for system planning, operations, and reliability management. As the nation moves to a competitive market structure, these functions have been disaggregated, and no single entity is responsible for reliability management. As a result, new tools, technologies, systems, and management processes are needed to manage the reliability of the electricity grid. However, a number of simultaneous trends prevent electricity market participants from pursuing development of these reliability tools: utilities are preoccupied with restructuring their businesses, research funding has declined, and the formation of Independent System Operators (ISOs) andmore » Regional Transmission Organizations (RTOs) to operate the grid means that control of transmission assets is separate from ownership of these assets; at the same time, business uncertainty, and changing regulatory policies have created a climate in which needed investment for transmission infrastructure and tools for reliability management has dried up. To address the resulting emerging gaps in reliability R&D, CERTS has undertaken much-needed public interest research on reliability technologies for the electricity grid. CERTS' vision is to: (1) Transform the electricity grid into an intelligent network that can sense and respond automatically to changing flows of power and emerging problems; (2) Enhance reliability management through market mechanisms, including transparency of real-time information on the status of the grid; (3) Empower customers to manage their energy use and reliability needs in response to real-time market price signals; and (4) Seamlessly integrate distributed technologies--including those for generation, storage, controls, and communications--to support the reliability needs of both the grid and individual customers.« less

  16. 78 FR 803 - Revisions to Electric Reliability Organization Definition of Bulk Electric System and Rules of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-04

    ...In this Final Rule, pursuant to section 215 of the Federal Power Act, the Federal Energy Regulatory Commission (Commission) approves modifications to the currently-effective definition of ``bulk electric system'' developed by the North American Electric Reliability Corporation (NERC), the Commission-certified Electric Reliability Organization. The Commission finds that the modified definition of ``bulk electric system'' removes language allowing for regional discretion in the currently-effective bulk electric system definition and establishes a bright-line threshold that includes all facilities operated at or above 100 kV. The modified definition also identifies specific categories of facilities and configurations as inclusions and exclusions to provide clarity in the definition of ``bulk electric system.'' In this Final Rule, the Commission also approves: NERC's revisions to its Rules of Procedure, which create an exception process to add elements to, or remove elements from, the definition of ``bulk electric system'' on a case-by-case basis; NERC's form entitled ``Detailed Information To Support an Exception Request'' that entities will use to support requests for exception from the ``bulk electric system'' definition; and NERC's implementation plan for the revised ``bulk electric system'' definition.

  17. 18 CFR 39.4 - Funding of the Electric Reliability Organization.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Reliability Organization. 39.4 Section 39.4 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT RULES CONCERNING... interruption as it transitions from one method of funding to another. Any proposed transitional funding plan...

  18. 18 CFR 39.4 - Funding of the Electric Reliability Organization.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Reliability Organization. 39.4 Section 39.4 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT RULES CONCERNING... interruption as it transitions from one method of funding to another. Any proposed transitional funding plan...

  19. 18 CFR 39.4 - Funding of the Electric Reliability Organization.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Reliability Organization. 39.4 Section 39.4 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT RULES CONCERNING... interruption as it transitions from one method of funding to another. Any proposed transitional funding plan...

  20. 18 CFR 39.4 - Funding of the Electric Reliability Organization.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Reliability Organization. 39.4 Section 39.4 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT RULES CONCERNING... interruption as it transitions from one method of funding to another. Any proposed transitional funding plan...

  1. Operation and planning of coordinated natural gas and electricity infrastructures

    NASA Astrophysics Data System (ADS)

    Zhang, Xiaping

    Natural gas is becoming rapidly the optimal choice for fueling new generating units in electric power system driven by abundant natural gas supplies and environmental regulations that are expected to cause coal-fired generation retirements. The growing reliance on natural gas as a dominant fuel for electricity generation throughout North America has brought the interaction between the natural gas and power grids into sharp focus. The primary concern and motivation of this research is to address the emerging interdependency issues faced by the electric power and natural gas industry. This thesis provides a comprehensive analysis of the interactions between the two systems regarding the short-term operation and long-term infrastructure planning. Natural gas and renewable energy appear complementary in many respects regarding fuel price and availability, environmental impact, resource distribution and dispatchability. In addition, demand response has also held the promise of making a significant contribution to enhance system operations by providing incentives to customers for a more flat load profile. We investigated the coordination between natural gas-fired generation and prevailing nontraditional resources including renewable energy, demand response so as to provide economical options for optimizing the short-term scheduling with the intense natural gas delivery constraints. As the amount and dispatch of gas-fired generation increases, the long-term interdependency issue is whether there is adequate pipeline capacity to provide sufficient gas to natural gas-fired generation during the entire planning horizon while it is widely used outside the power sector. This thesis developed a co-optimization planning model by incorporating the natural gas transportation system into the multi-year resource and transmission system planning problem. This consideration would provide a more comprehensive decision for the investment and accurate assessment for system adequacy and reliability. With the growing reliance on natural gas and widespread utilization of highly efficient combined heat and power (CHP), it is also questionable that whether the independent design of infrastructures can meet potential challenges of future energy supply. To address this issue, this thesis proposed an optimization framework for a sustainable multiple energy system expansion planning based on an energy hub model while considering the energy efficiency, emission and reliability performance. In addition, we introduced the probabilistic reliability evaluation and flow network analysis into the multiple energy system design in order to obtain an optimal and reliable network topology.

  2. Integrated Energy-Water Planning in the Western and Texas Interconnections

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tidwell, Vincent; Gasper, John; Goldstein, Robert

    2013-07-29

    While long-term regional electricity transmission planning has traditionally focused on cost, infrastructure utilization, and reliability, issues concerning the availability of water represent an emerging issue. Thermoelectric expansion must be considered in the context of competing demands from other water use sectors balanced with fresh and non-fresh water supplies subject to climate variability. An integrated Energy-Water Decision Support System (DSS) is being developed that will enable planners in the Western and Texas Interconnections to analyze the potential implications of water availability and cost for long-range transmission planning. The project brings together electric transmission planners (Western Electricity Coordinating Council and Electric Reliabilitymore » Council of Texas) with western water planners (Western Governors’ Association and the Western States Water Council). This paper lays out the basic framework for this integrated Energy-Water DSS.« less

  3. 75 FR 66038 - Planning Resource Adequacy Assessment Reliability Standard

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-27

    ... (R1 and R2) are assigned a violation risk factor (VRF) and violation severity level (VSL). However... base penalty amount. To do so, RFC is to assign a VRF to each Requirement and sub-Requirement of a... each VRF assignment.\\59\\ \\59\\ See North American Electric Reliability Corp., 119 FERC ] 61,145, order...

  4. A Worldwide Plan to Eliminate Global Warming, Air Pollution, and Energy Instability With Wind, Water, and Sunlight (WWS)

    NASA Astrophysics Data System (ADS)

    Jacobson, M. Z.; Delucchi, M. A.

    2011-12-01

    Global warming, air pollution mortality, and energy insecurity are three of the most significant problems facing the world today. This talk discusses a plan to solve the problems by powering 100% of the world's energy for all purposes, including electricity, transportation, industrial processes, and heating/cooling, with wind, water, and sunlight (WWS) within the next 20-40 years. It reviews and ranks major proposed energy solutions to global warming, air pollution mortality, and energy insecurity while considering other impacts of the proposed solutions, such as on water supply, land use, resource availability, reliability, wildlife, and catastrophic risk. It then evaluates a scenario for powering the world on the energy options determined to be the best while also considering materials, transmission infrastructure, costs, and politics. The study concludes that powering the world with WWS electric power technologies and a conversion from combustion to electricity and electrolytically-produced hydrogen is the cleanest and safest method of solving these problems. Due to the efficiency of electricity, such a conversion reduces world power demand by 30%. Methods of ensuring reliability of WWS electric power are available and will be demonstrated. We also conclude that neither liquid biofuels for transportation (including ethanol or biodiesel from any source), solid biofuels for home heating and cooking, biomass for electricity, conventional or fracked natural gas for electricity or transportation, nuclear power, nor coal with carbon capture (clean coal) are nearly so clean or safe as WWS technologies so are not recommended, either as bridge technologies or in the long term. Our plan calls for all new energy to be supplied by WWS-electricity-hydrogen resources no later than 2030 and all existing non-WWS infrastructure to be eliminated no later than 2050. We find that the plan is technically and economically feasible but politically challenging.

  5. Trial application of reliability technology to emergency diesel generators at the Trojan Nuclear Power Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wong, S.M.; Boccio, J.L.; Karimian, S.

    1986-01-01

    In this paper, a trial application of reliability technology to the emergency diesel generator system at the Trojan Nuclear Power Plant is presented. An approach for formulating a reliability program plan for this system is being developed. The trial application has shown that a reliability program process, using risk- and reliability-based techniques, can be interwoven into current plant operational activities to help in controlling, analyzing, and predicting faults that can challenge safety systems. With the cooperation of the utility, Portland General Electric Co., this reliability program can eventually be implemented at Trojan to track its effectiveness.

  6. Photovoltaic power system reliability considerations

    NASA Technical Reports Server (NTRS)

    Lalli, V. R.

    1980-01-01

    An example of how modern engineering and safety techniques can be used to assure the reliable and safe operation of photovoltaic power systems is presented. This particular application is for a solar cell power system demonstration project designed to provide electric power requirements for remote villages. The techniques utilized involve a definition of the power system natural and operating environment, use of design criteria and analysis techniques, an awareness of potential problems via the inherent reliability and FMEA methods, and use of fail-safe and planned spare parts engineering philosophy.

  7. openECA Platform and Analytics Alpha Test Results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robertson, Russell

    The objective of the Open and Extensible Control and Analytics (openECA) Platform for Phasor Data project is to develop an open source software platform that significantly accelerates the production, use, and ongoing development of real-time decision support tools, automated control systems, and off-line planning systems that (1) incorporate high-fidelity synchrophasor data and (2) enhance system reliability while enabling the North American Electric Reliability Corporation (NERC) operating functions of reliability coordinator, transmission operator, and/or balancing authority to be executed more effectively.

  8. openECA Platform and Analytics Beta Demonstration Results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robertson, Russell

    The objective of the Open and Extensible Control and Analytics (openECA) Platform for Phasor Data project is to develop an open source software platform that significantly accelerates the production, use, and ongoing development of real-time decision support tools, automated control systems, and off-line planning systems that (1) incorporate high-fidelity synchrophasor data and (2) enhance system reliability while enabling the North American Electric Reliability Corporation (NERC) operating functions of reliability coordinator, transmission operator, and/or balancing authority to be executed more effectively.

  9. Active Reliability Engineering - Technical Concept and Program Plan. A Solid-State Systems Approach to Increased Reliability and Availability in Military Systems.

    DTIC Science & Technology

    1983-10-05

    battle damage. Others are local electrical power and cooling disruptions. Again, a highly critical function is lost if its computer site is destroyed. A...formalized design of the test bed to meet the requirements of the functional description and goals of the program. AMTEC --Z3IT TASKS: 610, 710, 810

  10. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Michael Ebert

    This is the final report for the DOE-NETL grant entitled 'Creating New Incentives for Risk Identification & Insurance Processes for the Electric Utility Industry' and later, 'Energy & Risk Transfer Assessment'. It reflects work done on projects from 15 August 2004 to 29 February 2008. Projects were on a variety of topics, including commercial insurance for electrical utilities, the Electrical Reliability Organization, cost recovery by Gulf State electrical utilities after major hurricanes, and review of state energy emergency plans. This Final Technical Report documents and summarizes all work performed during the award period, which in this case is from 15more » August 2004 (date of notification of original award) through 29 February 2008. This report presents this information in a comprehensive, integrated fashion that clearly shows a logical and synergistic research trajectory, and is augmented with findings and conclusions drawn from the research as a whole. Four major research projects were undertaken and completed during the 42 month period of activities conducted and funded by the award; these are: (1) Creating New Incentives for Risk Identification and Insurance Process for the Electric Utility Industry (also referred to as the 'commercial insurance' research). Three major deliverables were produced: a pre-conference white paper, a two-day facilitated stakeholders workshop conducted at George Mason University, and a post-workshop report with findings and recommendations. All deliverables from this work are published on the CIP website at http://cipp.gmu.edu/projects/DoE-NETL-2005.php. (2) The New Electric Reliability Organization (ERO): an examination of critical issues associated with governance, standards development and implementation, and jurisdiction (also referred to as the 'ERO study'). Four major deliverables were produced: a series of preliminary memoranda for the staff of the Office of Electricity Delivery and Energy Reliability ('OE'), an ERO interview protocol and stakeholder/experts interviews, a formal research paper, and a data quality and availability study of North American Electric Reliability Corporation/ERO's disturbances and outages working group ('DAWG') databases. (3) Critical Electric Power Infrastructure Recovery and Reconstruction: Issues & New Policy Initiatives in Four Gulf Coast States After 2005's Catastrophic Hurricanes (also referred to as the 'Gulf Coast cost recovery study'). Four deliverables were produced: the original research paper providing preliminary findings and recommendations (29 September 2006), a formal presentation of that report to officials, staff and invited guests at OE's Washington, DC headquarters, a series of update memoranda and quarterly activity updates (1 November 2006 through Q3-2007), and a final cumulative update of the original research report (February 2008). Documentation and information on these research activities can be found on the CIP website at http://cipp.gmu.edu/projects/DoE-NETL-2006.php. (4) Evaluation of State Energy Emergency Response Plans (also referred to as the 'SEERP project'). Two major deliverables were produced: an evaluation of 47 SEERPs with findings, statistical analyses, geospatial renderings (mappings of the States whose plans were evaluated with statistical analysis underpinnings) and recommendations (17 September 2007), and a major revision to the original deliverable to include one additional plan (Missouri), with fully updated findings, statistical analyses, geospatial renderings, and recommendations (Revision 1, 29 February 2008).« less

  11. Undersea line planned to transmit to an island

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The electric utility serving Nantucket Island in Massachusetts, which until now has generated its own power, plans to lay 25 miles of transmission cable to connect with New England's mainland grid. The line will allow the utility to purchase less costly power and retire several old generators, improving both reliability and air quality on the island. Nantucket Electric Co. says the 33-Mw submarine link, costing at least $23 million, probably will connect with a line near the elbow on Cape Cod. The undersea cable will be as deep as 60 ft. Nantucket Electric plans to form a partnership within amore » few months with a mainland utility or private producer that would help finance the project and sell the power. The island utility has preliminary approval by the state Industrial Finance Agency for a tax-exempt bond issue to finance the cable, contingent on its finding a partner.« less

  12. Comprehensive Smart Grid Planning in a Regulated Utility Environment

    NASA Astrophysics Data System (ADS)

    Turner, Matthew; Liao, Yuan; Du, Yan

    2015-06-01

    This paper presents the tools and exercises used during the Kentucky Smart Grid Roadmap Initiative in a collaborative electric grid planning process involving state regulators, public utilities, academic institutions, and private interest groups. The mandate of the initiative was to assess the existing condition of smart grid deployments in Kentucky, to enhance understanding of smart grid concepts by stakeholders, and to develop a roadmap for the deployment of smart grid technologies by the jurisdictional utilities of Kentucky. Through involvement of many important stakeholder groups, the resultant Smart Grid Deployment Roadmap proposes an aggressive yet achievable strategy and timetable designed to promote enhanced availability, security, efficiency, reliability, affordability, sustainability and safety of the electricity supply throughout the state while maintaining Kentucky's nationally competitive electricity rates. The models and methods developed for this exercise can be utilized as a systematic process for the planning of coordinated smart grid deployments.

  13. Adequacy assessment of composite generation and transmission systems incorporating wind energy conversion systems

    NASA Astrophysics Data System (ADS)

    Gao, Yi

    The development and utilization of wind energy for satisfying electrical demand has received considerable attention in recent years due to its tremendous environmental, social and economic benefits, together with public support and government incentives. Electric power generation from wind energy behaves quite differently from that of conventional sources. The fundamentally different operating characteristics of wind energy facilities therefore affect power system reliability in a different manner than those of conventional systems. The reliability impact of such a highly variable energy source is an important aspect that must be assessed when the wind power penetration is significant. The focus of the research described in this thesis is on the utilization of state sampling Monte Carlo simulation in wind integrated bulk electric system reliability analysis and the application of these concepts in system planning and decision making. Load forecast uncertainty is an important factor in long range planning and system development. This thesis describes two approximate approaches developed to reduce the number of steps in a load duration curve which includes load forecast uncertainty, and to provide reasonably accurate generating and bulk system reliability index predictions. The developed approaches are illustrated by application to two composite test systems. A method of generating correlated random numbers with uniform distributions and a specified correlation coefficient in the state sampling method is proposed and used to conduct adequacy assessment in generating systems and in bulk electric systems containing correlated wind farms in this thesis. The studies described show that it is possible to use the state sampling Monte Carlo simulation technique to quantitatively assess the reliability implications associated with adding wind power to a composite generation and transmission system including the effects of multiple correlated wind sites. This is an important development as it permits correlated wind farms to be incorporated in large practical system studies without requiring excessive increases in computer solution time. The procedures described in this thesis for creating monthly and seasonal wind farm models should prove useful in situations where time period models are required to incorporate scheduled maintenance of generation and transmission facilities. There is growing interest in combining deterministic considerations with probabilistic assessment in order to evaluate the quantitative system risk and conduct bulk power system planning. A relatively new approach that incorporates deterministic and probabilistic considerations in a single risk assessment framework has been designated as the joint deterministic-probabilistic approach. The research work described in this thesis illustrates that the joint deterministic-probabilistic approach can be effectively used to integrate wind power in bulk electric system planning. The studies described in this thesis show that the application of the joint deterministic-probabilistic method provides more stringent results for a system with wind power than the traditional deterministic N-1 method because the joint deterministic-probabilistic technique is driven by the deterministic N-1 criterion with an added probabilistic perspective which recognizes the power output characteristics of a wind turbine generator.

  14. High Electricity Demand in the Northeast U.S.: PJM Reliability Network and Peaking Unit Impacts on Air Quality.

    PubMed

    Farkas, Caroline M; Moeller, Michael D; Felder, Frank A; Henderson, Barron H; Carlton, Annmarie G

    2016-08-02

    On high electricity demand days, when air quality is often poor, regional transmission organizations (RTOs), such as PJM Interconnection, ensure reliability of the grid by employing peak-use electric generating units (EGUs). These "peaking units" are exempt from some federal and state air quality rules. We identify RTO assignment and peaking unit classification for EGUs in the Eastern U.S. and estimate air quality for four emission scenarios with the Community Multiscale Air Quality (CMAQ) model during the July 2006 heat wave. Further, we population-weight ambient values as a surrogate for potential population exposure. Emissions from electricity reliability networks negatively impact air quality in their own region and in neighboring geographic areas. Monitored and controlled PJM peaking units are generally located in economically depressed areas and can contribute up to 87% of hourly maximum PM2.5 mass locally. Potential population exposure to peaking unit PM2.5 mass is highest in the model domain's most populated cities. Average daily temperature and national gross domestic product steer peaking unit heat input. Air quality planning that capitalizes on a priori knowledge of local electricity demand and economics may provide a more holistic approach to protect human health within the context of growing energy needs in a changing world.

  15. 76 FR 39470 - Integrated Resource Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-06

    ... region's natural resources. One component of this mission is the generation, transmission, and sale of reliable and affordable electric energy. TVA operates the nation's largest public power system, producing 4... 56 directly served large industrial and Federal customers. The TVA Act requires the TVA power system...

  16. Puget Sound Area Electric Reliability Plan : Appendix E, Transmission Reinforcement Analysis.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration.

    1992-04-01

    The purpose of this appendix to the draft environmental impact statement (EIS) report is to provide an update of the latest study work done on transmission system options for the Puget Sound Area Electric Reliability Plan. Also included in the attachments to the EIS are 2 reports analyzing the voltage stability of the Puget Sound transmission system and a review by Power Technologies, Inc. of the BPA voltage stability analysis and reactive options. Five transmission line options and several reactive options are presently being considered as possible solutions to the PSAFRP by the Transmission Team. The first two line optionsmore » would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. Plans were designed to provide at least 500 MVAR reactive margin.« less

  17. Feasibility study report for distribution dispatching center project 2nd stage for the Provincial Electricity Authority (PEA), Bangkok, Thailand, June 1998. Export trade information

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    The study concerns the Provincial Electricity Authority, a state agency within the Ministry of Interior that supplies electricity to 73 of Thailand`s provinces. The primary objective of this study is to help increase the ability of the Authority to meet the rapidly increasing demand for electric power within the Kingdom of Thailand in a reliable, safe and economic manner. This is Volume 1 and it consists of the following: (1) introduction; (2) assessment; (3) conceptual design; (4) economic and financial evaluation; (5) project plan; (6) Thailand impact; (7) industry review; (8) conclusion; and appendices.

  18. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schneider, Kevin; Tuffner, Frank; Elizondo, Marcelo

    Regulated electricity utilities are required to provide safe and reliable service to their customers at a reasonable cost. To balance the objectives of reliable service and reasonable cost, utilities build and operate their systems to operate under typical historic conditions. As a result, when abnormal events such as major storms or disasters occur, it is not uncommon to have extensive interruptions in service to the end-use customers. Because it is not cost effective to make the existing electrical infrastructure 100% reliable, society has come to expect disruptions during abnormal events. However, with the increasing number of abnormal weather events, themore » public is becoming less tolerant of these disruptions. One possible solution is to deploy microgrids as part of a coordinated resiliency plan to minimize the interruption of power to essential loads. This paper evaluates the feasibility of using microgrids as a resiliency resource, including their possible benefits and the associated technical challenges. A use-case of an operational microgrid is included.« less

  19. Time-Varying Value of Energy Efficiency in Michigan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mims, Natalie; Eckman, Tom; Schwartz, Lisa C.

    Quantifying the time-varying value of energy efficiency is necessary to properly account for all of its benefits and costs and to identify and implement efficiency resources that contribute to a low-cost, reliable electric system. Historically, most quantification of the benefits of efficiency has focused largely on the economic value of annual energy reduction. Due to the lack of statistically representative metered end-use load shape data in Michigan (i.e., the hourly or seasonal timing of electricity savings), the ability to confidently characterize the time-varying value of energy efficiency savings in the state, especially for weather-sensitive measures such as central air conditioning,more » is limited. Still, electric utilities in Michigan can take advantage of opportunities to incorporate the time-varying value of efficiency into their planning. For example, end-use load research and hourly valuation of efficiency savings can be used for a variety of electricity planning functions, including load forecasting, demand-side management and evaluation, capacity planning, long-term resource planning, renewable energy integration, assessing potential grid modernization investments, establishing rates and pricing, and customer service (KEMA 2012). In addition, accurately calculating the time-varying value of efficiency may help energy efficiency program administrators prioritize existing offerings, set incentive or rebate levels that reflect the full value of efficiency, and design new programs.« less

  20. Coal-Powered Electric Generating Unit Efficiency and Reliability Dialogue: Summary Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Taylor, Emmanuel

    Coal continues to play a critical role in powering the Nation’s electricity generation, especially for baseload power plants. With aging coal generation assets facing decreased performance due to the state of the equipment, and with challenges exacerbated by the current market pressures on the coal sector, there are opportunities to advance early-stage technologies that can retrofit or replace equipment components. These changes will eventually result in significant improvements in plant performance once further developed and deployed by industry. Research and development in areas such as materials, fluid dynamics, fuel properties and preparation characteristics, and a new generation of plant controlsmore » can lead to new components and systems that can help improve the efficiency and reliability of coal-fired power plants significantly, allowing these assets to continue to provide baseload power. Coal stockpiles at electricity generation plants are typically large enough to provide 30 to 60 days of power prior to resupply—significantly enhancing the stability and reliability of the U.S. electricity sector. Falling prices for non-dispatchable renewable energy and mounting environmental regulations, among other factors, have stimulated efforts to improve the efficiency of these coal-fired electric generating units (EGUs). In addition, increased reliance on natural gas and non-dispatchable energy sources has spurred efforts to further increase the reliability of coal EGUs. The Coal Powered EGU Efficiency and Reliability Dialogue brought together stakeholders from across the coal EGU industry to discuss methods for improvement. Participants at the event reviewed performance-enhancing innovations in coal EGUs, discussed the potential for data-driven management practices to increase efficiency and reliability, investigated the impacts of regulatory compliance on coal EGU performance, and discussed upcoming challenges for the coal industry. This report documents the key findings and research suggestions discussed at the event. Discussions at the workshop will aid DOE in developing a set of distinct initiatives that can be pursued by government and industry to realize promising technological pursuits. DOE plans to use the results of the Dialogue coupled with ongoing technical analysis of efficiency opportunities within the coal-fired fleet, and additional studies to develop a comprehensive strategy for capitalizing on thermal efficiency improvements. Expected Power Plant Efficiency Improvements include developing cost-effective, efficient, and reliable technologies for boilers, turbines, and sensors and controls to improve the reliability and efficiency of existing coal-based power plants. The Office of Fossil Energy at DOE plans to work with industry to develop knowledge pertaining to advanced technologies and systems that industry can subsequently develop. These technologies and systems will increase reliability, add operational flexibility and improve efficiency, thereby providing more robust power generation infrastructure. The following table lists the research suggestions and questions for further investigation that were identified by participants in each session of the dialogue.« less

  1. Descriptive Model of Generic WAMS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hauer, John F.; DeSteese, John G.

    The Department of Energy’s (DOE) Transmission Reliability Program is supporting the research, deployment, and demonstration of various wide area measurement system (WAMS) technologies to enhance the reliability of the Nation’s electrical power grid. Pacific Northwest National Laboratory (PNNL) was tasked by the DOE National SCADA Test Bed Program to conduct a study of WAMS security. This report represents achievement of the milestone to develop a generic WAMS model description that will provide a basis for the security analysis planned in the next phase of this study.

  2. Opportunities for Joint Water–Energy Management: Sensitivity of the 2010 Western U.S. Electricity Grid Operations to Climate Oscillations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Voisin, N.; Kintner-Meyer, M.; Wu, D.

    The 2016 SECURE Water Act report’s natural water availability benchmark, combined with the 2010 level of water demand from an integrated assessment model, is used as input to drive a large-scale water management model. The regulated flow at hydropower plants and thermoelectric plants in the Western U.S. electricity grid (WECC) is translated into potential hydropower generation and generation capacity constraints. The impact on reliability (unserved energy, reserve margin) and cost (production cost, carbon emissions) of water constraints on 2010-level WECC power system operations is assessed using an electricity production cost model (PCM). Use of the PCM reveals the changes inmore » generation dispatch that reflect the inter-regional interdependencies in water-constrained generation and the ability to use other generation resources to meet all electricity loads in the WECC. August grid operational benchmarks show a range of sensitivity in production cost (-8 to +11%) and carbon emissions (-7 to 11%). The reference reserve margin threshold of 15% above peak load is maintained in the scenarios analyzed, but in 5 out of 55 years unserved energy is observed when normal operations are maintained. There is 1 chance in 10 that a year will demonstrate unserved energy in August, which defines the system’s historical performance threshold to support impact, vulnerability, and adaptation analysis. For seasonal and longer term planning, i.e., multi-year drought, we demonstrate how the Water Scarcity Grid Impact Factor and climate oscillations (ENSO, PDO) can be used to plan for joint water-electricity management to maintain grid reliability.« less

  3. DOE Office of Scientific and Technical Information (OSTI.GOV)

    McKeigue, J.; Da Cunha, A.; Severino, D.

    Turkey's growing power market has attracted investors and project developers for over a decade, yet their plans have been dashed by unexpected political or financial crises or, worse, obstructed by a lengthy bureaucratic approval process. Now, with a more transparent retail electricity market, government regulators and investors are bullish on Turkey. Is Turkey ready to turn the power on? This report closely examine Turkey's plans to create a power infrastructure capable of providing the reliable electricity supplies necessary for sustained economic growth. It was compiled with on-the-ground research and extensive interview with key industrial and political figures. Today, hard coalmore » and lignite account for 21% of Turkey's electricity generation and gas-fired plants account for 50%. The Alfin Elbistan-B lignite-fired plant has attracted criticism for its lack of desulfurization units and ash dam facilities that have tarnished the industry's image. A 1,100 MW hard-coal fired plant using supercritical technology is under construction. 9 figs., 1 tab.« less

  4. 78 FR 65416 - Supplemental Environmental Impact Statement-Integrated Resource Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-31

    ... this mission is the generation, transmission, and sale of reliable and affordable electric energy. TVA Power System TVA operates the nation's largest public power system, producing 4 percent of all the... requires the TVA power system to be self-supporting and operated on a nonprofit basis and directs TVA to...

  5. Short Term Load Forecasting with Fuzzy Logic Systems for power system planning and reliability-A Review

    NASA Astrophysics Data System (ADS)

    Holmukhe, R. M.; Dhumale, Mrs. Sunita; Chaudhari, Mr. P. S.; Kulkarni, Mr. P. P.

    2010-10-01

    Load forecasting is very essential to the operation of Electricity companies. It enhances the energy efficient and reliable operation of power system. Forecasting of load demand data forms an important component in planning generation schedules in a power system. The purpose of this paper is to identify issues and better method for load foecasting. In this paper we focus on fuzzy logic system based short term load forecasting. It serves as overview of the state of the art in the intelligent techniques employed for load forecasting in power system planning and reliability. Literature review has been conducted and fuzzy logic method has been summarized to highlight advantages and disadvantages of this technique. The proposed technique for implementing fuzzy logic based forecasting is by Identification of the specific day and by using maximum and minimum temperature for that day and finally listing the maximum temperature and peak load for that day. The results show that Load forecasting where there are considerable changes in temperature parameter is better dealt with Fuzzy Logic system method as compared to other short term forecasting techniques.

  6. 78 FR 41339 - Electric Reliability Organization Proposal To Retire Requirements in Reliability Standards

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-10

    ...] Electric Reliability Organization Proposal To Retire Requirements in Reliability Standards AGENCY: Federal... Reliability Standards identified by the North American Electric Reliability Corporation (NERC), the Commission-certified Electric Reliability Organization. FOR FURTHER INFORMATION CONTACT: Kevin Ryan (Legal Information...

  7. Evolution of Wholesale Electricity Market Design with Increasing Levels of Renewable Generation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ela, E.; Milligan, M.; Bloom, A.

    2014-09-01

    Variable generation such as wind and photovoltaic solar power has increased substantially in recent years. Variable generation has unique characteristics compared to the traditional technologies that supply energy in the wholesale electricity markets. These characteristics create unique challenges in planning and operating the power system, and they can also influence the performance and outcomes from electricity markets. This report focuses on two particular issues related to market design: revenue sufficiency for long-term reliability and incentivizing flexibility in short-term operations. The report provides an overview of current design and some designs that have been proposed by industry or researchers.

  8. 75 FR 65624 - Notice of Attendance at North American Electric Reliability Corporation Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-26

    ... Electric Reliability Corporation Meetings October 19, 2010. The Federal Energy Regulatory Commission hereby... Electric Reliability Corporation meetings: NERC Board of Trustees Meeting November 3, 2010, Wednesday..., North American Electric Reliability Corporation; Docket No. RC08-5, North American Electric Reliability...

  9. 18 CFR 39.3 - Electric Reliability Organization certification.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Electric Reliability... CERTIFICATION OF THE ELECTRIC RELIABILITY ORGANIZATION; AND PROCEDURES FOR THE ESTABLISHMENT, APPROVAL, AND ENFORCEMENT OF ELECTRIC RELIABILITY STANDARDS § 39.3 Electric Reliability Organization certification. (a) Any...

  10. 18 CFR 39.3 - Electric Reliability Organization certification.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Electric Reliability... CERTIFICATION OF THE ELECTRIC RELIABILITY ORGANIZATION; AND PROCEDURES FOR THE ESTABLISHMENT, APPROVAL, AND ENFORCEMENT OF ELECTRIC RELIABILITY STANDARDS § 39.3 Electric Reliability Organization certification. (a) Any...

  11. 18 CFR 39.3 - Electric Reliability Organization certification.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Electric Reliability... CERTIFICATION OF THE ELECTRIC RELIABILITY ORGANIZATION; AND PROCEDURES FOR THE ESTABLISHMENT, APPROVAL, AND ENFORCEMENT OF ELECTRIC RELIABILITY STANDARDS § 39.3 Electric Reliability Organization certification. (a) Any...

  12. 18 CFR 39.3 - Electric Reliability Organization certification.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Electric Reliability... CERTIFICATION OF THE ELECTRIC RELIABILITY ORGANIZATION; AND PROCEDURES FOR THE ESTABLISHMENT, APPROVAL, AND ENFORCEMENT OF ELECTRIC RELIABILITY STANDARDS § 39.3 Electric Reliability Organization certification. (a) Any...

  13. Generation expansion planning in a competitive electric power industry

    NASA Astrophysics Data System (ADS)

    Chuang, Angela Shu-Woan

    This work investigates the application of non-cooperative game theory to generation expansion planning (GEP) in a competitive electricity industry. We identify fundamental ways competition changes the nature of GEP, review different models of oligopoly behavior, and argue that assumptions of the Cournot model are compatible with GEP. Applying Cournot theory of oligopoly behavior, we formulate a GEP model that may characterize expansion in the new competitive regime, particularly in pool-dominated generation supply industries. Our formulation incorporates multiple markets and is patterned after the basic design of the California ISO/PX system. Applying the model, we conduct numerical experiments on a test system, and analyze generation investment and market participation decisions of different candidate expansion units that vary in costs and forced outage rates. Simulations are performed under different scenarios of competition. In particular, we observe higher probabilistic measures of reliability from Cournot expansion compared to the expansion plan of a monopoly with an equivalent minimum reserve margin requirement. We prove several results for a subclass of problems encompassed by our formulation. In particular, we prove that under certain conditions Cournot competition leads to greater total capacity expansion than a situation in which generators collude in a cartel. We also show that industry output after introduction of new technology is no less than monopoly output. So a monopoly may lack sufficient incentive to introduce new technologies. Finally, we discuss the association between capacity payments and the issue of pricing reliability. And we derive a formula for computing ideal capacity payment rates by extending the Value of Service Reliability technique.

  14. 75 FR 57761 - North American Electric Reliability Corporation; Notice of Filing September 14, 2010.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-22

    ... request for approval of implementation plans for Generator Owners and Generator Operators of nuclear power..., 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at http://www.ferc.gov... Washington, DC. There is an ``eSubscription'' link on the Web site that enables subscribers to receive e-mail...

  15. An algorithmic interactive planning framework in support of sustainable technologies

    NASA Astrophysics Data System (ADS)

    Prica, Marija D.

    This thesis addresses the difficult problem of generation expansion planning that employs the most effective technologies in today's changing electric energy industry. The electrical energy industry, in both the industrialized world and in developing countries, is experiencing transformation in a number of different ways. This transformation is driven by major technological breakthroughs (such as the influx of unconventional smaller-scale resources), by industry restructuring, changing environmental objectives, and the ultimate threat of resource scarcity. This thesis proposes a possible planning framework in support of sustainable technologies where sustainability is viewed as a mix of multiple attributes ranging from reliability and environmental impact to short- and long-term efficiency. The idea of centralized peak-load pricing, which accounts for the tradeoffs between cumulative operational effects and the cost of new investments, is the key concept in support of long-term planning in the changing industry. To start with, an interactive planning framework for generation expansion is posed as a distributed decision-making model. In order to reconcile the distributed sub-objectives of different decision makers with system-wide sustainability objectives, a new concept of distributed interactive peak load pricing is proposed. To be able to make the right decisions, the decision makers must have sufficient information about the estimated long-term electricity prices. The sub-objectives of power plant owners and load-serving entities are profit maximization. Optimized long-term expansion plans based on predicted electricity prices are communicated to the system-wide planning authority as long-run bids. The long-term expansion bids are cleared by the coordinating planner so that the system-wide long-term performance criteria are satisfied. The interactions between generation owners and the coordinating planning authority are repeated annually. We view the proposed interactive planning framework as a necessary paradigm for planning in the changing industry where choice must be reconciled with societal public objectives.

  16. Evaluating penalized logistic regression models to predict Heat-Related Electric grid stress days

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bramer, L. M.; Rounds, J.; Burleyson, C. D.

    Understanding the conditions associated with stress on the electricity grid is important in the development of contingency plans for maintaining reliability during periods when the grid is stressed. In this paper, heat-related grid stress and the relationship with weather conditions is examined using data from the eastern United States. Penalized logistic regression models were developed and applied to predict stress on the electric grid using weather data. The inclusion of other weather variables, such as precipitation, in addition to temperature improved model performance. Several candidate models and datasets were examined. A penalized logistic regression model fit at the operation-zone levelmore » was found to provide predictive value and interpretability. Additionally, the importance of different weather variables observed at different time scales were examined. Maximum temperature and precipitation were identified as important across all zones while the importance of other weather variables was zone specific. The methods presented in this work are extensible to other regions and can be used to aid in planning and development of the electrical grid.« less

  17. Evaluating penalized logistic regression models to predict Heat-Related Electric grid stress days

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bramer, Lisa M.; Rounds, J.; Burleyson, C. D.

    Understanding the conditions associated with stress on the electricity grid is important in the development of contingency plans for maintaining reliability during periods when the grid is stressed. In this paper, heat-related grid stress and the relationship with weather conditions were examined using data from the eastern United States. Penalized logistic regression models were developed and applied to predict stress on the electric grid using weather data. The inclusion of other weather variables, such as precipitation, in addition to temperature improved model performance. Several candidate models and combinations of predictive variables were examined. A penalized logistic regression model which wasmore » fit at the operation-zone level was found to provide predictive value and interpretability. Additionally, the importance of different weather variables observed at various time scales were examined. Maximum temperature and precipitation were identified as important across all zones while the importance of other weather variables was zone specific. In conclusion, the methods presented in this work are extensible to other regions and can be used to aid in planning and development of the electrical grid.« less

  18. Switch: a planning tool for power systems with large shares of intermittent renewable energy.

    PubMed

    Fripp, Matthias

    2012-06-05

    Wind and solar power are highly variable, so it is it unclear how large a role they can play in future power systems. This work introduces a new open-source electricity planning model--Switch--that identifies the least-cost strategy for using renewable and conventional generators and transmission in a large power system over a multidecade period. Switch includes an unprecedented amount of spatial and temporal detail, making it possible to address a new type of question about the optimal design and operation of power systems with large amounts of renewable power. A case study of California for 2012-2027 finds that there is no maximum possible penetration of wind and solar power--these resources could potentially be used to reduce emissions 90% or more below 1990 levels without reducing reliability or severely raising the cost of electricity. This work also finds that policies that encourage customers to shift electricity demand to times when renewable power is most abundant (e.g., well-timed charging of electric vehicles) could make it possible to achieve radical emission reductions at moderate costs.

  19. Evaluating penalized logistic regression models to predict Heat-Related Electric grid stress days

    DOE PAGES

    Bramer, Lisa M.; Rounds, J.; Burleyson, C. D.; ...

    2017-09-22

    Understanding the conditions associated with stress on the electricity grid is important in the development of contingency plans for maintaining reliability during periods when the grid is stressed. In this paper, heat-related grid stress and the relationship with weather conditions were examined using data from the eastern United States. Penalized logistic regression models were developed and applied to predict stress on the electric grid using weather data. The inclusion of other weather variables, such as precipitation, in addition to temperature improved model performance. Several candidate models and combinations of predictive variables were examined. A penalized logistic regression model which wasmore » fit at the operation-zone level was found to provide predictive value and interpretability. Additionally, the importance of different weather variables observed at various time scales were examined. Maximum temperature and precipitation were identified as important across all zones while the importance of other weather variables was zone specific. In conclusion, the methods presented in this work are extensible to other regions and can be used to aid in planning and development of the electrical grid.« less

  20. Power system modeling and optimization methods vis-a-vis integrated resource planning (IRP)

    NASA Astrophysics Data System (ADS)

    Arsali, Mohammad H.

    1998-12-01

    The state-of-the-art restructuring of power industries is changing the fundamental nature of retail electricity business. As a result, the so-called Integrated Resource Planning (IRP) strategies implemented on electric utilities are also undergoing modifications. Such modifications evolve from the imminent considerations to minimize the revenue requirements and maximize electrical system reliability vis-a-vis capacity-additions (viewed as potential investments). IRP modifications also provide service-design bases to meet the customer needs towards profitability. The purpose of this research as deliberated in this dissertation is to propose procedures for optimal IRP intended to expand generation facilities of a power system over a stretched period of time. Relevant topics addressed in this research towards IRP optimization are as follows: (1) Historical prospective and evolutionary aspects of power system production-costing models and optimization techniques; (2) A survey of major U.S. electric utilities adopting IRP under changing socioeconomic environment; (3) A new technique designated as the Segmentation Method for production-costing via IRP optimization; (4) Construction of a fuzzy relational database of a typical electric power utility system for IRP purposes; (5) A genetic algorithm based approach for IRP optimization using the fuzzy relational database.

  1. The Cost of Saving Electricity Through Energy Efficiency Programs Funded by Utility Customers: 2009–2015

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hoffman, Ian M.; Goldman, Charles A.; Murphy, Sean

    The average cost to utilities to save a kilowatt-hour (kWh) in the United States is 2.5 cents, according to the most comprehensive assessment to date of the cost performance of energy efficiency programs funded by electricity customers. These costs are similar to those documented earlier. Cost-effective efficiency programs help ensure electricity system reliability at the most affordable cost as part of utility planning and implementation activities for resource adequacy. Building on prior studies, Berkeley Lab analyzed the cost performance of 8,790 electricity efficiency programs between 2009 and 2015 for 116 investor-owned utilities and other program administrators in 41 states. Themore » Berkeley Lab database includes programs representing about three-quarters of total spending on electricity efficiency programs in the United States.« less

  2. Toward an electrical power utility for space exploration

    NASA Technical Reports Server (NTRS)

    Bercaw, Robert W.

    1989-01-01

    Plans for space exploration depend on today's technology programs addressing the novel requirements of space-based enterprise. The requirements for electrical power will be formidable: megawatts in magnitude, reliability for multi-year missions and the flexibility to adapt to needs unanticipated at design time. The reasons for considering the power management and distribution in the various systems from a total mission perspective, rather than simply extrapolating current spacecraft design practice, are discussed. A utility approach to electric power being developed at the Lewis Research Center is described. It integrates requirements from a broad selection of current development programs with studies in which both space and terrestrial technologies are conceptually applied to exploration mission scenarios.

  3. SimWIND: A Geospatial Infrastructure Model for Wind Energy Production and Transmission

    NASA Astrophysics Data System (ADS)

    Middleton, R. S.; Phillips, B. R.; Bielicki, J. M.

    2009-12-01

    Wind is a clean, enduring energy resource with a capacity to satisfy 20% or more of the electricity needs in the United States. A chief obstacle to realizing this potential is the general paucity of electrical transmission lines between promising wind resources and primary load centers. Successful exploitation of this resource will therefore require carefully planned enhancements to the electric grid. To this end, we present the model SimWIND for self-consistent optimization of the geospatial arrangement and cost of wind energy production and transmission infrastructure. Given a set of wind farm sites that satisfy meteorological viability and stakeholder interest, our model simultaneously determines where and how much electricity to produce, where to build new transmission infrastructure and with what capacity, and where to use existing infrastructure in order to minimize the cost for delivering a given amount of electricity to key markets. Costs and routing of transmission line construction take into account geographic and social factors, as well as connection and delivery expenses (transformers, substations, etc.). We apply our model to Texas and consider how findings complement the 2008 Electric Reliability Council of Texas (ERCOT) Competitive Renewable Energy Zones (CREZ) Transmission Optimization Study. Results suggest that integrated optimization of wind energy infrastructure and cost using SimWIND could play a critical role in wind energy planning efforts.

  4. Low-Cost, Robust, Threat-Aware Wireless Sensor Network for Assuring the Nation's Energy Infrastructure

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carols H. Rentel

    2007-03-31

    Eaton, in partnership with Oak Ridge National Laboratory and the Electric Power Research Institute (EPRI) has completed a project that applies a combination of wireless sensor network (WSN) technology, anticipatory theory, and a near-term value proposition based on diagnostics and process uptime to ensure the security and reliability of critical electrical power infrastructure. Representatives of several Eaton business units have been engaged to ensure a viable commercialization plan. Tennessee Valley Authority (TVA), American Electric Power (AEP), PEPCO, and Commonwealth Edison were recruited as partners to confirm and refine the requirements definition from the perspective of the utilities that actually operatemore » the facilities to be protected. Those utilities have cooperated with on-site field tests as the project proceeds. Accomplishments of this project included: (1) the design, modeling, and simulation of the anticipatory wireless sensor network (A-WSN) that will be used to gather field information for the anticipatory application, (2) the design and implementation of hardware and software prototypes for laboratory and field experimentation, (3) stack and application integration, (4) develop installation and test plan, and (5) refinement of the commercialization plan.« less

  5. Power Cycle Testing of Power Switches: A Literature Survey

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    GopiReddy, Lakshmi Reddy; Tolbert, Leon M.; Ozpineci, Burak

    Reliability of power converters and lifetime prediction has been a major topic of research in the last few decades, especially for traction applications. The main failures in high power semiconductors are caused by thermomechanical fatigue. Power cycling and temperature cycling are the two most common thermal acceleration tests used in assessing reliability. The objective of this paper is to study the various power cycling tests found in the literature and to develop generalized steps in planning application specific power cycling tests. A comparison of different tests based on the failures, duration, test circuits, and monitored electrical parameters is presented.

  6. Component Reliability Testing of Long-Life Sorption Cryocoolers

    NASA Technical Reports Server (NTRS)

    Bard, S.; Wu, J.; Karlmann, P.; Mirate, C.; Wade, L.

    1994-01-01

    This paper summarizes ongoing experiments characterizing the ability of critical sorption cryocooler components to achieve highly reliable operation for long-life space missions. Test data obtained over the past several years at JPL are entirely consistent with achieving ten year life for sorption compressors, electrical heaters, container materials, valves, and various sorbent materials suitable for driving 8 to 180 K refrigeration stages. Test results for various compressor systems are reported. Planned future tests necessary to gain a detailed understanding of the sensitivity of cooler performance and component life to operating constraints, design configurations, and fabrication, assembly and handling techniques, are also discussed.

  7. Power Cycle Testing of Power Switches: A Literature Survey

    DOE PAGES

    GopiReddy, Lakshmi Reddy; Tolbert, Leon M.; Ozpineci, Burak

    2014-09-18

    Reliability of power converters and lifetime prediction has been a major topic of research in the last few decades, especially for traction applications. The main failures in high power semiconductors are caused by thermomechanical fatigue. Power cycling and temperature cycling are the two most common thermal acceleration tests used in assessing reliability. The objective of this paper is to study the various power cycling tests found in the literature and to develop generalized steps in planning application specific power cycling tests. A comparison of different tests based on the failures, duration, test circuits, and monitored electrical parameters is presented.

  8. 77 FR 39691 - Commission Information Collection Activities (FERC-725); Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-05

    ... information collection FERC-725, Certification of Electric Reliability Organization; Procedures for Electric Reliability Standards, to the Office of Management and Budget (OMB) for review of the information collection..., Certification of Electric Reliability Organization; Procedures for Electric Reliability Standards. OMB Control...

  9. Hawaii electric system reliability.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Silva Monroy, Cesar Augusto; Loose, Verne William

    2012-09-01

    This report addresses Hawaii electric system reliability issues; greater emphasis is placed on short-term reliability but resource adequacy is reviewed in reference to electric consumers' views of reliability %E2%80%9Cworth%E2%80%9D and the reserve capacity required to deliver that value. The report begins with a description of the Hawaii electric system to the extent permitted by publicly available data. Electrical engineering literature in the area of electric reliability is researched and briefly reviewed. North American Electric Reliability Corporation standards and measures for generation and transmission are reviewed and identified as to their appropriateness for various portions of the electric grid and formore » application in Hawaii. Analysis of frequency data supplied by the State of Hawaii Public Utilities Commission is presented together with comparison and contrast of performance of each of the systems for two years, 2010 and 2011. Literature tracing the development of reliability economics is reviewed and referenced. A method is explained for integrating system cost with outage cost to determine the optimal resource adequacy given customers' views of the value contributed by reliable electric supply. The report concludes with findings and recommendations for reliability in the State of Hawaii.« less

  10. Hawaii Electric System Reliability

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Loose, Verne William; Silva Monroy, Cesar Augusto

    2012-08-01

    This report addresses Hawaii electric system reliability issues; greater emphasis is placed on short-term reliability but resource adequacy is reviewed in reference to electric consumers’ views of reliability “worth” and the reserve capacity required to deliver that value. The report begins with a description of the Hawaii electric system to the extent permitted by publicly available data. Electrical engineering literature in the area of electric reliability is researched and briefly reviewed. North American Electric Reliability Corporation standards and measures for generation and transmission are reviewed and identified as to their appropriateness for various portions of the electric grid and formore » application in Hawaii. Analysis of frequency data supplied by the State of Hawaii Public Utilities Commission is presented together with comparison and contrast of performance of each of the systems for two years, 2010 and 2011. Literature tracing the development of reliability economics is reviewed and referenced. A method is explained for integrating system cost with outage cost to determine the optimal resource adequacy given customers’ views of the value contributed by reliable electric supply. The report concludes with findings and recommendations for reliability in the State of Hawaii.« less

  11. 77 FR 65873 - North American Electric Reliability Corporation; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-31

    ... Electric Reliability Corporation; Notice of Filing Take notice that on October 12, 2012, the North American Electric Reliability Corporation (NERC) submitted a compliance filing in accordance with the Federal Energy Regulatory Commission's Order (FERC or Commission) in North American Electric Reliability Corporation, 140...

  12. 77 FR 32629 - North American Electric Reliability Corporation; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-01

    ... Electric Reliability Corporation; Notice of Filing Take notice that on May 14, 2012, the North American Electric Reliability Corporation (NERC) submitted a compliance filing in accordance with the Federal Energy Regulatory Commission's Order (FERC or Commission) in North American Electric Reliability Corporation, 138...

  13. 78 FR 18333 - North American Electric Reliability Corporation; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-26

    ... Electric Reliability Corporation; Notice of Filing Take notice that on March 15, 2013, the North American Electric Reliability Corporation (NERC) submitted a compliance filing and report in accordance with the Federal Energy Regulatory Commission's Order (FERC or Commission) in North American Electric Reliability...

  14. 78 FR 9687 - North American Electric Reliability Corporation; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-11

    ... Electric Reliability Corporation; Notice of Filing Take notice that on February 1, 2013, the North American Electric Reliability Corporation (NERC) submitted a compliance filing in accordance with the Federal Energy Regulatory Commission's Order (FERC or Commission) in North American Electric Reliability Corporation, 141...

  15. Systems Integration Fact Sheet

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2016-06-01

    This fact sheet is an overview of the Systems Integration subprogram at the U.S. Department of Energy SunShot Initiative. The Systems Integration subprogram enables the widespread deployment of safe, reliable, and cost-effective solar energy technologies by addressing the associated technical and non-technical challenges. These include timely and cost-effective interconnection procedures, optimal system planning, accurate prediction of solar resources, monitoring and control of solar power, maintaining grid reliability and stability, and many more. To address the challenges associated with interconnecting and integrating hundreds of gigawatts of solar power onto the electricity grid, the Systems Integration program funds research, development, and demonstrationmore » projects in four broad, interrelated focus areas: grid performance and reliability, dispatchability, power electronics, and communications.« less

  16. Energy Planning for Indian Nations within the WRAP: A Field Guide

    ERIC Educational Resources Information Center

    Acker, Thomas L.; Jones, Chian; Smith, Dean Howard

    2006-01-01

    Energy in the form of electricity is a hot topic among tribes within the Western Regional Air Partnership (WRAP). For too many people, energy is too expensive, not reliable, or even nonexistent. For many tribal members, up to 20 or 30 percent of income is spent on energy, which is unbelievably high compared to nontribal people in the same area.…

  17. 78 FR 18333 - North American Electric Reliability Corporation; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-26

    ... Electric Reliability Corporation; Notice of Filing Take notice that on March 11, 2013, the North American Electric Reliability Corporation and SERC Reliability Corporation submitted a compliance filing in accordance with the Federal Energy Regulatory Commission's Order (FERC or Commission) in Regional Reliability...

  18. 75 FR 81601 - North American Electric Reliability Corporation; Notice of Compliance Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-28

    ... Electric Reliability Corporation; Notice of Compliance Filing December 20, 2010. Take notice that on December 1, 2010, North American Electric Reliability Corporation, in response to Paragraph 274 of the... Transfer Capability Reliability Standards. \\1\\ Mandatory Reliability Standards for the Calculation of...

  19. 75 FR 14097 - Revision to Electric Reliability Organization Definition of Bulk Electric System

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-24

    ... Commission 18 CFR Part 40 [Docket No. RM09-18-000; 130 FERC ] 61,204] Revision to Electric Reliability... Reliability Organization (ERO) to revise its definition of the term ``bulk electric system'' to include all... compliance with mandatory Reliability Standards. The Commission believes that a 100 kV threshold for...

  20. Light Water Reactor Sustainability Program Integrated Program Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McCarthy, Kathryn A.; Busby, Jeremy; Hallbert, Bruce

    2014-04-01

    Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 70%) of non-greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to experience a 31% growth from 2009 to 2035. At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license for a total of 60 years of operation. Figure E-1 shows projected nuclear energy contribution tomore » the domestic generating capacity. If current operating nuclear power plants do not operate beyond 60 years, the total fraction of generated electrical energy from nuclear power will begin to decline—even with the expected addition of new nuclear generating capacity. The oldest commercial plants in the United States reached their 40th anniversary in 2009. The U.S. Department of Energy Office of Nuclear Energy’s Research and Development Roadmap (Nuclear Energy Roadmap) organizes its activities around four objectives that ensure nuclear energy remains a compelling and viable energy option for the United States. The four objectives are as follows: (1) develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors; (2) develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration’s energy security and climate change goals; (3) develop sustainable nuclear fuel cycles; and (4) understand and minimize the risks of nuclear proliferation and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program’s plans.« less

  1. Experimental characterization of intrapulse tissue conductivity changes for electroporation.

    PubMed

    Neal, Robert E; Garcia, Paulo A; Robertson, John L; Davalos, Rafael V

    2011-01-01

    Cells exposed to short electric pulses experience a change in their transmembrane potential, which can lead to increased membrane permeability of the cell. When the energy of the pulses surpasses a threshold, the cell dies in a non-thermal manner known as irreversible electroporation (IRE). IRE has shown promise in the focal ablation of pathologic tissues. Its non-thermal mechanism spares sensitive structures and facilitates rapid lesion resolution. IRE effects depend on the electric field distribution, which can be predicted with numerical modeling. When the cells become permeabilized, the bulk tissue properties change, affecting this distribution. For IRE to become a reliable and successful treatment of diseased tissues, robust predictive treatment planning methods must be developed. It is vital to understand the changes in tissue properties undergoing the electric pulses to improve numerical models and predict treatment volumes. We report on the experimental characterization of these changes for kidney tissue. Tissue samples were pulsed between plate electrodes while intrapulse voltage and current data were measured to determine the conductivity of the tissue during the pulse. Conductivity was then established as a function of the electric field to which the tissue is exposed. This conductivity curve was used in a numerical model to demonstrate the impact of accounting for these changes when modeling electric field distributions to develop treatment plans.

  2. 18 CFR 39.3 - Electric Reliability Organization certification.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... operators of the Bulk-Power System, and other interested parties for improvement of the Electric Reliability... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Electric Reliability..., Reliability Standards that provide for an adequate level of reliability of the Bulk-Power System, and (2) Has...

  3. Reliability Assessment Approach for Stirling Convertors and Generators

    NASA Technical Reports Server (NTRS)

    Shah, Ashwin R.; Schreiber, Jeffrey G.; Zampino, Edward; Best, Timothy

    2004-01-01

    Stirling power conversion is being considered for use in a Radioisotope Power System for deep-space science missions because it offers a multifold increase in the conversion efficiency of heat to electric power. Quantifying the reliability of a Radioisotope Power System that utilizes Stirling power conversion technology is important in developing and demonstrating the capability for long-term success. A description of the Stirling power convertor is provided, along with a discussion about some of the key components. Ongoing efforts to understand component life, design variables at the component and system levels, related sources, and the nature of uncertainties is discussed. The requirement for reliability also is discussed, and some of the critical areas of concern are identified. A section on the objectives of the performance model development and a computation of reliability is included to highlight the goals of this effort. Also, a viable physics-based reliability plan to model the design-level variable uncertainties at the component and system levels is outlined, and potential benefits are elucidated. The plan involves the interaction of different disciplines, maintaining the physical and probabilistic correlations at all the levels, and a verification process based on rational short-term tests. In addition, both top-down and bottom-up coherency were maintained to follow the physics-based design process and mission requirements. The outlined reliability assessment approach provides guidelines to improve the design and identifies governing variables to achieve high reliability in the Stirling Radioisotope Generator design.

  4. Climate and water resource change impacts and adaptation potential for US power supply

    DOE PAGES

    Miara, Ariel; Macknick, Jordan E.; Vorosmarty, Charles J.; ...

    2017-10-30

    Power plants that require cooling currently (2015) provide 85% of electricity generation in the United States. These facilities need large volumes of water and sufficiently cool temperatures for optimal operations, and projected climate conditions may lower their potential power output and affect reliability. We evaluate the performance of 1,080 thermoelectric plants across the contiguous US under future climates (2035-2064) and their collective performance at 19 North American Electric Reliability Corporation (NERC) sub-regions. Joint consideration of engineering interactions with climate, hydrology and environmental regulations reveals the region-specific performance of energy systems and the need for regional energy security and climate-water adaptationmore » strategies. Despite climate-water constraints on individual plants, the current power supply infrastructure shows potential for adaptation to future climates by capitalizing on the size of regional power systems, grid configuration and improvements in thermal efficiencies. Without placing climate-water impacts on individual plants in a broader power systems context, vulnerability assessments that aim to support adaptation and resilience strategies misgauge the extent to which regional energy systems are vulnerable. As a result, climate-water impacts can lower thermoelectric reserve margins, a measure of systems-level reliability, highlighting the need to integrate climate-water constraints on thermoelectric power supply into energy planning, risk assessments, and system reliability management.« less

  5. Climate and water resource change impacts and adaptation potential for US power supply

    NASA Astrophysics Data System (ADS)

    Miara, Ariel; Macknick, Jordan E.; Vörösmarty, Charles J.; Tidwell, Vincent C.; Newmark, Robin; Fekete, Balazs

    2017-11-01

    Power plants that require cooling currently (2015) provide 85% of electricity generation in the United States. These facilities need large volumes of water and sufficiently cool temperatures for optimal operations, and projected climate conditions may lower their potential power output and affect reliability. We evaluate the performance of 1,080 thermoelectric plants across the contiguous US under future climates (2035-2064) and their collective performance at 19 North American Electric Reliability Corporation (NERC) sub-regions. Joint consideration of engineering interactions with climate, hydrology and environmental regulations reveals the region-specific performance of energy systems and the need for regional energy security and climate-water adaptation strategies. Despite climate-water constraints on individual plants, the current power supply infrastructure shows potential for adaptation to future climates by capitalizing on the size of regional power systems, grid configuration and improvements in thermal efficiencies. Without placing climate-water impacts on individual plants in a broader power systems context, vulnerability assessments that aim to support adaptation and resilience strategies misgauge the extent to which regional energy systems are vulnerable. Climate-water impacts can lower thermoelectric reserve margins, a measure of systems-level reliability, highlighting the need to integrate climate-water constraints on thermoelectric power supply into energy planning, risk assessments, and system reliability management.

  6. Climate and water resource change impacts and adaptation potential for US power supply

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miara, Ariel; Macknick, Jordan E.; Vorosmarty, Charles J.

    Power plants that require cooling currently (2015) provide 85% of electricity generation in the United States. These facilities need large volumes of water and sufficiently cool temperatures for optimal operations, and projected climate conditions may lower their potential power output and affect reliability. We evaluate the performance of 1,080 thermoelectric plants across the contiguous US under future climates (2035-2064) and their collective performance at 19 North American Electric Reliability Corporation (NERC) sub-regions. Joint consideration of engineering interactions with climate, hydrology and environmental regulations reveals the region-specific performance of energy systems and the need for regional energy security and climate-water adaptationmore » strategies. Despite climate-water constraints on individual plants, the current power supply infrastructure shows potential for adaptation to future climates by capitalizing on the size of regional power systems, grid configuration and improvements in thermal efficiencies. Without placing climate-water impacts on individual plants in a broader power systems context, vulnerability assessments that aim to support adaptation and resilience strategies misgauge the extent to which regional energy systems are vulnerable. As a result, climate-water impacts can lower thermoelectric reserve margins, a measure of systems-level reliability, highlighting the need to integrate climate-water constraints on thermoelectric power supply into energy planning, risk assessments, and system reliability management.« less

  7. 77 FR 74655 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-17

    ... the following electric reliability filings: Docket Numbers: RD13-2-000. Applicants: North American Electric Reliability Corporation. Description: Petition of the North American Electric Reliability... that the Commission received the following electric rate filings: Docket Numbers: ER13-342-001...

  8. Applying reliability analysis to design electric power systems for More-electric aircraft

    NASA Astrophysics Data System (ADS)

    Zhang, Baozhu

    The More-Electric Aircraft (MEA) is a type of aircraft that replaces conventional hydraulic and pneumatic systems with electrically powered components. These changes have significantly challenged the aircraft electric power system design. This thesis investigates how reliability analysis can be applied to automatically generate system topologies for the MEA electric power system. We first use a traditional method of reliability block diagrams to analyze the reliability level on different system topologies. We next propose a new methodology in which system topologies, constrained by a set reliability level, are automatically generated. The path-set method is used for analysis. Finally, we interface these sets of system topologies with control synthesis tools to automatically create correct-by-construction control logic for the electric power system.

  9. Advanced Demonstration and Test Reactor Options Study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Petti, David Andrew; Hill, R.; Gehin, J.

    Global efforts to address climate change will require large-scale decarbonization of energy production in the United States and elsewhere. Nuclear power already provides 20% of electricity production in the United States (U.S.) and is increasing in countries undergoing rapid growth around the world. Because reliable, grid-stabilizing, low emission electricity generation, energy security, and energy resource diversity will be increasingly valued, nuclear power’s share of electricity production has a potential to grow. In addition, there are non electricity applications (e.g., process heat, desalination, hydrogen production) that could be better served by advanced nuclear systems. Thus, the timely development, demonstration, and commercializationmore » of advanced nuclear reactors could diversify the nuclear technologies available and offer attractive technology options to expand the impact of nuclear energy for electricity generation and non-electricity missions. The purpose of this planning study is to provide transparent and defensible technology options for a test and/or demonstration reactor(s) to be built to support public policy, innovation and long term commercialization within the context of the Department of Energy’s (DOE’s) broader commitment to pursuing an “all of the above” clean energy strategy and associated time lines. This planning study includes identification of the key features and timing needed for advanced test or demonstration reactors to support research, development, and technology demonstration leading to the commercialization of power plants built upon these advanced reactor platforms. This planning study is consistent with the Congressional language contained within the fiscal year 2015 appropriation that directed the DOE to conduct a planning study to evaluate “advanced reactor technology options, capabilities, and requirements within the context of national needs and public policy to support innovation in nuclear energy”. Advanced reactors are defined in this study as reactors that use coolants other than water. Advanced reactor technologies have the potential to expand the energy applications, enhance the competitiveness, and improve the sustainability of nuclear energy.« less

  10. Scoping study on trends in the economic value of electricity reliability to the U.S. economy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Eto, Joseph; Koomey, Jonathan; Lehman, Bryan

    During the past three years, working with more than 150 organizations representing public and private stakeholders, EPRI has developed the Electricity Technology Roadmap. The Roadmap identifies several major strategic challenges that must be successfully addressed to ensure a sustainable future in which electricity continues to play an important role in economic growth. Articulation of these anticipated trends and challenges requires a detailed understanding of the role and importance of reliable electricity in different sectors of the economy. This report is intended to contribute to that understanding by analyzing key aspects of trends in the economic value of electricity reliability inmore » the U.S. economy. We first present a review of recent literature on electricity reliability costs. Next, we describe three distinct end-use approaches for tracking trends in reliability needs: (1) an analysis of the electricity-use requirements of office equipment in different commercial sectors; (2) an examination of the use of aggregate statistical indicators of industrial electricity use and economic activity to identify high reliability-requirement customer market segments; and (3) a case study of cleanrooms, which is a cross-cutting market segment known to have high reliability requirements. Finally, we present insurance industry perspectives on electricity reliability as an example of a financial tool for addressing customers' reliability needs.« less

  11. 77 FR 31345 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-25

    ... electric reliability filings: Docket Numbers: RR12-9-000. Applicants: North American Electric Reliability Corp. Description: Petition of the North American Electric Reliability Corporation for Approval of... that the Commission received the following electric rate filings: Docket Numbers: ER11-2780-002...

  12. Autonomously managed electrical power systems

    NASA Technical Reports Server (NTRS)

    Callis, Charles P.

    1986-01-01

    The electric power systems for future spacecraft such as the Space Station will necessarily be more sophisticated and will exhibit more nearly autonomous operation than earlier spacecraft. These new power systems will be more reliable and flexible than their predecessors offering greater utility to the users. Automation approaches implemented on various power system breadboards are investigated. These breadboards include the Hubble Space Telescope power system test bed, the Common Module Power Management and Distribution system breadboard, the Autonomusly Managed Power System (AMPS) breadboard, and the 20 kilohertz power system breadboard. Particular attention is given to the AMPS breadboard. Future plans for these breadboards including the employment of artificial intelligence techniques are addressed.

  13. State Performance-Based Regulation Using Multiyear Rate Plans for U.S. Electric Utilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lowry, Mark Newton; Makos, Matt; Deason, Jeff

    Electric utilities today must contain costs at a time when many need to modernize aging systems and all face major changes in technologies, customer preferences and competitive pressures.Most U.S. electric utility facilities are investor-owned, subject to rate and service regulation by state public utility commissions. Regulatory systems under which these utilities operate affect their performance and ability to meet these challenges. In this business environment, multiyear rate plans have some advantages over traditional rate regulation.The report focuses on key design issues and provides case studies of the multiyear rate plan approach, applicable to both vertically integrated and restructured states. Markmore » Newton Lowry and Matt Makos of Pacific Energy Group Research and Jeff Deason of Berkeley Lab authored the report; Lisa Schwartz, Berkeley Lab, was project manager and technical editor.The report is aimed primarily at state utility regulators and stakeholders in the state regulatory process. The multiyear rate approach also provides ideas on how to streamline oversight of public power utilities and rural electric cooperatives for their governing boards.Two key provisions of multiyear rate plans strengthen cost containment incentives and streamline regulation: 1. Reducing frequency of rate cases, typically to every four or five years 2. Using an attrition relief mechanism to escalate rates or revenue between rate cases to address cost pressures such as inflation and growth in number of customers, independently of the utility’s own cost Better utility performance can be achieved under well-designed multiyear rate plans while achieving lower regulatory costs. Benefits can be shared between utilities and their customers. But plans can be complex and involve significant changes in the regulatory system. Designing plans that stimulate utility performance without undue risk and share benefits fairly can be challenging.This report discusses the rationale for multiyear rate plans and their usefulness under modern business conditions. It then explains critical plan design issues and challenges and presents results from numerical research that considers the extra incentive power achieved under different plan provisions. Next, the report presents several case studies of utilities that have operated under formal multiyear rate plans or, for various reasons, have stayed out of rate cases for more than a decade. These studies consider the effect of multiyear rate plans and rate case frequency on utility cost, reliability and other performance dimensions.« less

  14. 75 FR 15371 - Time Error Correction Reliability Standard

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-29

    ... Electric Reliability Council of Texas (ERCOT) manages the flow of electric power to 22 million Texas customers. As the independent system operator for the region, ERCOT schedules power on an electric grid that... Coordinating Council (WECC) is responsible for coordinating and promoting bulk electric system reliability in...

  15. Advanced Grid-Friendly Controls Demonstration Project for Utility-Scale PV Power Plants

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gevorgian, Vahan; O'Neill, Barbara

    A typical photovoltaic (PV) power plant consists of multiple power electronic inverters and can contribute to grid stability and reliability through sophisticated 'grid-friendly' controls. The availability and dissemination of actual test data showing the viability of advanced utility-scale PV controls among all industry stakeholders can leverage PV's value from being simply an energy resource to providing additional ancillary services that range from variability smoothing and frequency regulation to power quality. Strategically partnering with a selected utility and/or PV power plant operator is a key condition for a successful demonstration project. The U.S. Department of Energy's (DOE's) Solar Energy Technologies Officemore » selected the National Renewable Energy Laboratory (NREL) to be a principal investigator in a two-year project with goals to (1) identify a potential partner(s), (2) develop a detailed scope of work and test plan for a field project to demonstrate the gird-friendly capabilities of utility-scale PV power plants, (3) facilitate conducting actual demonstration tests, and (4) disseminate test results among industry stakeholders via a joint NREL/DOE publication and participation in relevant technical conferences. The project implementation took place in FY 2014 and FY 2015. In FY14, NREL established collaborations with AES and First Solar Electric, LLC, to conduct demonstration testing on their utility-scale PV power plants in Puerto Rico and Texas, respectively, and developed test plans for each partner. Both Puerto Rico Electric Power Authority and the Electric Reliability Council of Texas expressed interest in this project because of the importance of such advanced controls for the reliable operation of their power systems under high penetration levels of variable renewable generation. During FY15, testing was completed on both plants, and a large amount of test data was produced and analyzed that demonstrates the ability of PV power plants to provide various types of new grid-friendly controls.« less

  16. Investigation of the impact of main control room digitalization on operators cognitive reliability in nuclear power plants.

    PubMed

    Zhou, Yong; Mu, Haiying; Jiang, Jianjun; Zhang, Li

    2012-01-01

    Currently, there is a trend in nuclear power plants (NPPs) toward introducing digital and computer technologies into main control rooms (MCRs). Safe generation of electric power in NPPs requires reliable performance of cognitive tasks such as fault detection, diagnosis, and response planning. The digitalization of MCRs has dramatically changed the whole operating environment, and the ways operators interact with the plant systems. If the design and implementation of the digital technology is incompatible with operators' cognitive characteristics, it may have negative effects on operators' cognitive reliability. Firstly, on the basis of three essential prerequisites for successful cognitive tasks, a causal model is constructed to reveal the typical human performance issues arising from digitalization. The cognitive mechanisms which they impact cognitive reliability are analyzed in detail. Then, Bayesian inference is used to quantify and prioritize the influences of these factors. It suggests that interface management and unbalanced workload distribution have more significant impacts on operators' cognitive reliability.

  17. Evaluating North American Electric Grid Reliability Using the Barabasi-Albert Network Model

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chassin, David P.; Posse, Christian

    2005-09-15

    The reliability of electric transmission systems is examined using a scale-free model of network topology and failure propagation. The topologies of the North American eastern and western electric grids are analyzed to estimate their reliability based on the Barabási-Albert network model. A commonly used power system reliability index is computed using a simple failure propagation model. The results are compared to the values of power system reliability indices previously obtained using other methods and they suggest that scale-free network models are usable to estimate aggregate electric grid reliability.

  18. Evaluating North American Electric Grid Reliability Using the Barabasi-Albert Network Model

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chassin, David P.; Posse, Christian

    2005-09-15

    The reliability of electric transmission systems is examined using a scale-free model of network topology and failure propagation. The topologies of the North American eastern and western electric grids are analyzed to estimate their reliability based on the Barabasi-Albert network model. A commonly used power system reliability index is computed using a simple failure propagation model. The results are compared to the values of power system reliability indices previously obtained using standard power engineering methods, and they suggest that scale-free network models are usable to estimate aggregate electric grid reliability.

  19. 75 FR 65964 - Version One Regional Reliability Standard for Resource and Demand Balancing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-27

    ... Standard developed by the Western Electricity Coordinating Council and approved by the North American... Electricity Coordinating Council 6 C. WECC Regional Reliability Standard BAL-002-WECC-1... 9 II. Discussion 14... Electricity Coordinating Council (WECC) and approved by the North American Electric Reliability Corporation...

  20. The Electric Vehicle Alternative.

    DTIC Science & Technology

    1981-06-01

    7 qc, LIST OF TABLES Table Page 2-1 AIR TRAINING COMMAND EV DEMONSTRATION PROGRAM 30 3-1 COMPUTATION FOR DERIVATION OF THE COMBINED RELIABILITY...batteries wear out quickly be- cause the zinc they use gets dissapated in their charging/discharging cycle. GM plans to have such problems solved by 1985...with how the G & W battery controls the release of poi- sonous chlorine gas in the case of an accident.. Unlike the lead-acid battery, the zinc

  1. Avionics Integrity Program (AVIP). Volume 1. Procurement Phase Issues - Design, Manufacturing, and Integration

    DTIC Science & Technology

    1984-03-01

    Engineering initiative to develop an orderly plan and procedure to assure that USAF acquire reliable, high quality, supportable avionics with a higher avail...susceptibility te~t~ (radiated and conducted), and emission of radio frequency energy tests."l6) Other electrical stresses can include over/under voltage...jo ints, poor welds, and dielectric defects. Also, instruments with components unable to endu very high temperatures can be safely tested. 1-19

  2. 78 FR 43198 - Flexible and Local Resources Needed for Reliability in the California Wholesale Electric Market...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-19

    ... Local Resources Needed for Reliability in the California Wholesale Electric Market; Notice of Staff... Flexible and Local Resources Needed for Reliability in the California Wholesale Electric Market July 31... development of a durable, market-based mechanism to provide incentives to insure reliability needs are met...

  3. Optimizing the U.S. Electric System with a High Penetration of Renewables

    NASA Astrophysics Data System (ADS)

    Corcoran, B. A.; Jacobson, M. Z.

    2013-12-01

    As renewable energy generators are increasingly being installed throughout the U.S., there is growing interest in interconnecting diverse renewable generators (primarily wind and solar) across large geographic areas through an enhanced transmission system. This reduces variability in the aggregate power output, increases system reliability, and allows for the development of the best overall group of renewable technologies and sites to meet the load. Studies are therefore needed to determine the most efficient and economical plan to achieve large area interconnections in a future electric system with a high penetration of renewables. This research quantifies the effects of aggregating electric load together with diverse renewable generation throughout the ten Federal Energy Regulatory Commission (FERC) regions in the contiguous U.S. A deterministic linear program has been built in AMPL (A Mathematical Programming Language) to solve for the least-cost organizational structure and system (generators, transmission, and storage) for a highly renewable electric grid. The analysis will 1) examine a highly renewable 2006 electric system, including various sensitivity cases and additional system components such as additional load from electric vehicles, and 2) create a 'roadmap' from the existing 2006 system to a highly renewable system in 2030, accounting for projected price and demand changes and generator retirements based on age and environmental regulations. Ideally, results from this study will offer insight for a federal renewable energy policy (such as a renewable portfolio standard) and how to best organize U.S. regions for transmission planning.

  4. Water withdrawal and consumption reduction analysis for electrical energy generation system

    NASA Astrophysics Data System (ADS)

    Nouri, Narjes

    There is an increasing concern over shrinking water resources. Water use in the energy sector primarily occurs in electricity generation. Anticipating scarcer supplies, the value of water is undoubtedly on the rise and design, implementation, and utilization of water saving mechanisms in energy generation systems are becoming inevitable. Most power plants generate power by boiling water to produce steam to spin electricity-generating turbines. Large quantities of water are often used to cool the steam in these plants. As a consequence, most fossil-based power plants in addition to consuming water, impact the water resources by raising the temperature of water withdrawn for cooling. A comprehensive study is conducted in this thesis to analyze and quantify water withdrawals and consumption of various electricity generation sources such as coal, natural gas, renewable sources, etc. Electricity generation for the state of California is studied and presented as California is facing a serious drought problem affecting more than 30 million people. Integrated planning for the interleaved energy and water sectors is essential for both water and energy savings. A linear model is developed to minimize the water consumption while considering several limitations and restrictions. California has planned to shut down some of its hydro and nuclear plants due to environmental concerns. Studies have been performed for various electricity generation and water saving scenarios including no-hydro and no-nuclear plant and the results are presented. Modifications to proposed different scenarios have been applied and discussed to meet the practical and reliability constraints.

  5. Long term load forecasting accuracy in electric utility integrated resource planning

    DOE PAGES

    Carvallo, Juan Pablo; Larsen, Peter H.; Sanstad, Alan H.; ...

    2018-05-23

    Forecasts of electricity consumption and peak demand over time horizons of one or two decades are a key element in electric utilities’ meeting their core objective and obligation to ensure reliable and affordable electricity supplies for their customers while complying with a range of energy and environmental regulations and policies. These forecasts are an important input to integrated resource planning (IRP) processes involving utilities, regulators, and other stake-holders. Despite their importance, however, there has been little analysis of long term utility load forecasting accuracy. We conduct a retrospective analysis of long term load forecasts on twelve Western U. S. electricmore » utilities in the mid-2000s to find that most overestimated both energy consumption and peak demand growth. A key reason for this was the use of assumptions that led to an overestimation of economic growth. We find that the complexity of forecast methods and the accuracy of these forecasts are mildly correlated. In addition, sensitivity and risk analysis of load growth and its implications for capacity expansion were not well integrated with subsequent implementation. As a result, we review changes in the utilities load forecasting methods over the subsequent decade, and discuss the policy implications of long term load forecast inaccuracy and its underlying causes.« less

  6. Long term load forecasting accuracy in electric utility integrated resource planning

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carvallo, Juan Pablo; Larsen, Peter H.; Sanstad, Alan H.

    Forecasts of electricity consumption and peak demand over time horizons of one or two decades are a key element in electric utilities’ meeting their core objective and obligation to ensure reliable and affordable electricity supplies for their customers while complying with a range of energy and environmental regulations and policies. These forecasts are an important input to integrated resource planning (IRP) processes involving utilities, regulators, and other stake-holders. Despite their importance, however, there has been little analysis of long term utility load forecasting accuracy. We conduct a retrospective analysis of long term load forecasts on twelve Western U. S. electricmore » utilities in the mid-2000s to find that most overestimated both energy consumption and peak demand growth. A key reason for this was the use of assumptions that led to an overestimation of economic growth. We find that the complexity of forecast methods and the accuracy of these forecasts are mildly correlated. In addition, sensitivity and risk analysis of load growth and its implications for capacity expansion were not well integrated with subsequent implementation. As a result, we review changes in the utilities load forecasting methods over the subsequent decade, and discuss the policy implications of long term load forecast inaccuracy and its underlying causes.« less

  7. Electrical service reliability: the customer perspective

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Samsa, M.E.; Hub, K.A.; Krohm, G.C.

    1978-09-01

    Electric-utility-system reliability criteria have traditionally been established as a matter of utility policy or through long-term engineering practice, generally with no supportive customer cost/benefit analysis as justification. This report presents results of an initial study of the customer perspective toward electric-utility-system reliability, based on critical review of over 20 previous and ongoing efforts to quantify the customer's value of reliable electric service. A possible structure of customer classifications is suggested as a reasonable level of disaggregation for further investigation of customer value, and these groups are characterized in terms of their electricity use patterns. The values that customers assign tomore » reliability are discussed in terms of internal and external cost components. A list of options for effecting changes in customer service reliability is set forth, and some of the many policy issues that could alter customer-service reliability are identified.« less

  8. National Conference on Integrated Resource Planning: Proceedings

    NASA Astrophysics Data System (ADS)

    Until recently, state regulators have focused most of their attention on the development of least-cost or integrated resource planning (IRP) processes for electric utilities. A number of commissions are beginning to scrutinize the planning processes of local gas distribution companies (LDCs) because of the increased control that LDCs have over their purchased gas costs (as well as the associated risks) and because of questions surrounding the role and potential of gas end-use efficiency options. Traditionally, resource planning (LDCs) has concentrated on options for purchasing and storing gas. Integrated resource planning involves the creation of a process in which supply-side and demand-side options are integrated to create a resource mix that reliably satisfies customers' short-term and long-term energy service needs at the lowest cost. As applied to gas utilities, an integrated resource plan seeks to balance cost and reliability, and should not be interpreted simply as the search for lowest commodity costs. The National Association of Regulatory Utility Commissioners' (NARUC) Energy Conservation committee asked Lawrence Berkeley Laboratory (LBL) to survey state PUCs to determine the extent to which they have undertaken least cost planning for gas utilities. The survey included the following topics: status of state PUC least-cost planning regulations and practices for gas utilities; type and scope of natural gas DSM programs in effect, including fuel substitution; economic tests and analysis methods used to evaluate DSM programs; relationship between prudency reviews of gas utility purchasing practices and integrated resource planning; and key regulatory issues facing gas utilities during the next five years.

  9. 18 CFR 39.10 - Changes to an Electric Reliability Organization Rule or Regional Entity Rule.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Changes to an Electric Reliability Organization Rule or Regional Entity Rule. 39.10 Section 39.10 Conservation of Power and Water... ESTABLISHMENT, APPROVAL, AND ENFORCEMENT OF ELECTRIC RELIABILITY STANDARDS § 39.10 Changes to an Electric...

  10. 18 CFR 39.10 - Changes to an Electric Reliability Organization Rule or Regional Entity Rule.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Changes to an Electric Reliability Organization Rule or Regional Entity Rule. 39.10 Section 39.10 Conservation of Power and Water... ESTABLISHMENT, APPROVAL, AND ENFORCEMENT OF ELECTRIC RELIABILITY STANDARDS § 39.10 Changes to an Electric...

  11. 18 CFR 39.10 - Changes to an Electric Reliability Organization Rule or Regional Entity Rule.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Changes to an Electric Reliability Organization Rule or Regional Entity Rule. 39.10 Section 39.10 Conservation of Power and Water... ESTABLISHMENT, APPROVAL, AND ENFORCEMENT OF ELECTRIC RELIABILITY STANDARDS § 39.10 Changes to an Electric...

  12. 18 CFR 39.10 - Changes to an Electric Reliability Organization Rule or Regional Entity Rule.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Changes to an Electric Reliability Organization Rule or Regional Entity Rule. 39.10 Section 39.10 Conservation of Power and Water... ESTABLISHMENT, APPROVAL, AND ENFORCEMENT OF ELECTRIC RELIABILITY STANDARDS § 39.10 Changes to an Electric...

  13. 77 FR 4031 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-26

    ... notice that the Commission received the following electric reliability filings: Docket Numbers: RD11-3-000. Applicants: North American Electric Reliability Corporation. Description: Compliance Filing of the North American Electric Reliability Corporation in Response to November 17, 2011 Order Approving...

  14. 78 FR 26024 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ... reliability filings: Docket Numbers: RR13-5-000. Applicants: North American Electric Reliability Corporation. Description: Petition of the North American Electric Reliability Corporation for Approval of Amendments to Delegation Agreement with Midwest Reliability Organization--Amendments to the MRO Regional Reliability...

  15. 78 FR 65640 - Notice of Commissioner and Staff Attendance at North American Electric Reliability Corporation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-01

    ... Attendance at North American Electric Reliability Corporation Meetings The Federal Energy Regulatory... following meetings: North American Electric Reliability Corporation Member Representatives Committee and..., Compliance Committee, and Standards Oversight and Technology Committee Meetings The Westin Buckhead Atlanta...

  16. 78 FR 7773 - Notice of Commissioner and Staff Attendance at North American Electric Reliability Corporation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-04

    ... Attendance at North American Electric Reliability Corporation Meetings The Federal Energy Regulatory... following meetings: North American Electric Reliability Corporation, Member Representatives Committee and... Resources Committee, and Standards Oversight and Technology Committee Meetings. Hotel del Coronado, 1500...

  17. A fuzzy set approach for reliability calculation of valve controlling electric actuators

    NASA Astrophysics Data System (ADS)

    Karmachev, D. P.; Yefremov, A. A.; Luneva, E. E.

    2017-02-01

    The oil and gas equipment and electric actuators in particular frequently perform in various operational modes and under dynamic environmental conditions. These factors affect equipment reliability measures in a vague, uncertain way. To eliminate the ambiguity, reliability model parameters could be defined as fuzzy numbers. We suggest a technique that allows constructing fundamental fuzzy-valued performance reliability measures based on an analysis of electric actuators failure data in accordance with the amount of work, completed before the failure, instead of failure time. Also, this paper provides a computation example of fuzzy-valued reliability and hazard rate functions, assuming Kumaraswamy complementary Weibull geometric distribution as a lifetime (reliability) model for electric actuators.

  18. States of Cybersecurity: Electricity Distribution System Discussions

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pena, Ivonne; Ingram, Michael; Martin, Maurice

    State and local entities that oversee the reliable, affordable provision of electricity are faced with growing and evolving threats from cybersecurity risks to our nation's electricity distribution system. All-hazards system resilience is a shared responsibility among electric utilities and their regulators or policy-setting boards of directors. Cybersecurity presents new challenges and should be a focus for states, local governments, and Native American tribes that are developing energy-assurance plans to protect critical infrastructure. This research sought to investigate the implementation of governance and policy at the distribution utility level that facilitates cybersecurity preparedness to inform the U.S. Department of Energy (DOE),more » Office of Energy Policy and Systems Analysis; states; local governments; and other stakeholders on the challenges, gaps, and opportunities that may exist for future analysis. The need is urgent to identify the challenges and inconsistencies in how cybersecurity practices are being applied across the United States to inform the development of best practices, mitigations, and future research and development investments in securing the electricity infrastructure. By examining the current practices and applications of cybersecurity preparedness, this report seeks to identify the challenges and persistent gaps between policy and execution and reflect the underlying motivations of distinct utility structures as they play out at the local level. This study aims to create an initial baseline of cybersecurity preparedness within the distribution electricity sector. The focus of this study is on distribution utilities not bound by the cybersecurity guidelines of the North American Electric Reliability Corporation (NERC) to examine the range of mechanisms taken by state regulators, city councils that own municipal utilities, and boards of directors of rural cooperatives.« less

  19. Development of large, horizontal-axis wind turbines

    NASA Technical Reports Server (NTRS)

    Baldwin, D. H.; Kennard, J.

    1985-01-01

    A program to develop large, horizontal-axis wind turbines is discussed. The program is directed toward developing the technology for safe, reliable, environmentally acceptable large wind turbines that can generate a significant amount of electricity at costs competitive with those of conventional electricity-generating systems. In addition, these large wind turbines must be fully compatible with electric utility operations and interface requirements. Several ongoing projects in large-wind-turbine development are directed toward meeting the technology requirements for utility applications. The machines based on first-generation technology (Mod-OA and Mod-1) successfully completed their planned periods of experimental operation in June, 1982. The second-generation machines (Mod-2) are in operation at selected utility sites. A third-generation machine (Mod-5) is under contract. Erection and initial operation of the Mod-5 in Hawaii should take place in 1986. Each successive generation of technology increased reliability and energy capture while reducing the cost of electricity. These advances are being made by gaining a better understanding of the system-design drivers, improving the analytical design tools, verifying design methods with operating field data, and incorporating new technology and innovative designs. Information is given on the results from the first- and second-generation machines (Mod-OA, - 1, and -2), the status of the Department of Interior, and the status of the third-generation wind turbine (Mod-5).

  20. Opportunity for offshore wind to reduce future demand for coal-fired power plants in China with consequent savings in emissions of CO2.

    PubMed

    Lu, Xi; McElroy, Michael B; Chen, Xinyu; Kang, Chongqing

    2014-12-16

    Although capacity credits for wind power have been embodied in power systems in the U.S. and Europe, the current planning framework for electricity in China continues to treat wind power as a nondispatchable source with zero contribution to firm capacity. This study adopts a rigorous reliability model for the electric power system evaluating capacity credits that should be recognized for offshore wind resources supplying power demands for Jiangsu, China. Jiangsu is an economic hub located in the Yangtze River delta accounting for 10% of the total electricity consumed in China. Demand for electricity in Jiangsu is projected to increase from 331 TWh in 2009 to 800 TWh by 2030. Given a wind penetration level of 60% for the future additional Jiangsu power supply, wind resources distributed along the offshore region of five coastal provinces in China (Shandong, Jiangsu, Shanghai, Zhejiang, and Fujian) should merit a capacity credit of 12.9%, the fraction of installed wind capacity that should be recognized to displace coal-fired systems without violating the reliability standard. In the high-coal-price scenario, with 60% wind penetration, reductions in CO2 emissions relative to a business as usual reference could be as large as 200.2 million tons of CO2 or 51.8% of the potential addition, with a cost for emissions avoided of $29.0 per ton.

  1. 77 FR 65679 - Notice of Commissioner and Staff Attendance at North American Electric Reliability Corporation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-30

    ... Attendance at North American Electric Reliability Corporation Meetings The Federal Energy Regulatory... following meetings: North American Electric Reliability Corporation Member Representatives Committee and Board of Trustees Meetings Board of Trustees Compliance Committee and Standards Oversight and Technology...

  2. 78 FR 26349 - Notice of Commissioner and Staff Attendance at North American Electric Reliability Corporation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-06

    ... Attendance at North American Electric Reliability Corporation Meetings The Federal Energy Regulatory... following meetings: North American Electric Reliability Corporation Member Representatives Committee and... Standards Oversight and Technology Committee Meetings Sheraton Boston Hotel, 39 Dalton Street, Boston, MA...

  3. 76 FR 62802 - North American Electric Reliability Corporation; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Docket No. RC11-6-000] North American Electric Reliability Corporation; Notice of Filing Take notice that on September 30, 2011, the North American Electric Reliability Corporation (NERC) filed a petition requesting Federal Energy Regulatory...

  4. 77 FR 59745 - Delegation of Authority Regarding Electric Reliability Organization's Budget, Delegation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-01

    ...; Order No. 766] Delegation of Authority Regarding Electric Reliability Organization's Budget, Delegation... Electric Reliability Organization (ERO) filings. In particular, this Final Rule transfers delegated... delegation agreements, and ERO policies and procedures. DATES: This rule is effective October 1, 2012. FOR...

  5. 77 FR 11517 - Rapid Response Team for Transmission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-27

    ...: Office of Electricity Delivery and Energy Reliability, Department of Energy, DoE. ACTION: Request for information. SUMMARY: The Department of Energy's Office of Electricity Delivery and Energy Reliability is... Electricity Delivery and Energy Reliability, Mail Code: OE-20, U.S. Department of Energy, 1000 Independence...

  6. 76 FR 21889 - Sunshine Act Meeting Notice

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-19

    ...-Tag Information to Commission Staff. E-7 RD11-4-000 North American Electric Reliability Corporation. E... and Control; and Voltage and Reactive. E-10 RM10-8-000 Electric Reliability Organization... Standards. E-11 RM10-29-000 Electric Reliability Organization Interpretation of Transmission Operations...

  7. 75 FR 67960 - North American Electric Reliability Corporation; Notice of Compliance Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-04

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. RM06-16-011] North American Electric Reliability Corporation; Notice of Compliance Filing October 28, 2010. Take notice that on October 25, 2010, the North American Electric Reliability Corporation (NERC), submitted a compliance filing...

  8. 75 FR 4374 - North American Electric Reliability Corporation; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-27

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RM06-22-011] North American Electric Reliability Corporation; Notice of Filing January 20, 2010. Take notice that on January 19, 2010, North American Electric Reliability Corporation (NERC) filed additional information that will allow the...

  9. 78 FR 25260 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-30

    .... Comments Due: 5 p.m. ET 5/9/13. Take notice that the Commission received the following electric reliability filings: Docket Numbers: RD13-8-000. Applicants: North American Electric Reliability Corporation. Description: Petition of the North American Electric Reliability Corporation for Approval of an Interpretation...

  10. Solar Electric Propulsion Vehicle Demonstration to Support Future Space Exploration Missions

    NASA Technical Reports Server (NTRS)

    Smith, Bryan K.; Nazario, Margaret L.; Cunningham, Cameron C.

    2012-01-01

    Human and robotic exploration beyond Low Earth Orbit (LEO) will require enabling capabilities that are efficient, affordable, and reliable. Solar Electric Propulsion (SEP) is highly advantageous because of its favorable in-space mass transfer efficiency compared to traditional chemical propulsion systems. The NASA studies have demonstrated that this advantage becomes highly significant as missions progress beyond Earth orbit. Recent studies of human exploration missions and architectures evaluated the capabilities needed to perform a variety of human exploration missions including missions to Near Earth Objects (NEOs). The studies demonstrated that SEP stages have potential to be the most cost effective solution to perform beyond LEO transfers of high mass cargoes for human missions. Recognizing that these missions require power levels more than 10X greater than current electric propulsion systems, NASA embarked upon a progressive pathway to identify critical technologies needed and a plan for an incremental demonstration mission. The NASA studies identified a 30kW class demonstration mission that can serve as a meaningful demonstration of the technologies, operational challenges, and provide the appropriate scaling and modularity required. This paper describes the planning options for a representative demonstration 30kW class SEP mission.

  11. 77 FR 44610 - Notice of Filing; North American Electric Reliability Corporation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-30

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RC08-5-003] Notice of Filing; North American Electric Reliability Corporation Take notice that on July 18, 2012, North American Electric Reliability Corporation (NERC) submitted a filing to comply with the Commission's directive in its...

  12. 18 CFR 376.204 - Delegation of Commission authority during emergency conditions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... the Office of Energy Projects; (v) Director of the Office of Electric Reliability; (vi) Director of... Energy Projects, in order of seniority; (x) Deputy Directors, Office of Electric Reliability, in order of... Energy Projects; Assistant Directors and Division heads, Office of Electric Reliability; Deputy Associate...

  13. 77 FR 45598 - North American Electric Reliability Corporation; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-01

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. RM06-16-000] North American Electric Reliability Corporation; Notice of Filing Take notice that on March 16, 2012, the North American Electric Reliability Corporation (NERC) submitted a filing proposing to amend the NERC Glossary Definition...

  14. Reliability and cost evaluation of small isolated power systems containing photovoltaic and wind energy

    NASA Astrophysics Data System (ADS)

    Karki, Rajesh

    Renewable energy application in electric power systems is growing rapidly worldwide due to enhanced public concerns for adverse environmental impacts and escalation in energy costs associated with the use of conventional energy sources. Photovoltaics and wind energy sources are being increasingly recognized as cost effective generation sources. A comprehensive evaluation of reliability and cost is required to analyze the actual benefits of utilizing these energy sources. The reliability aspects of utilizing renewable energy sources have largely been ignored in the past due the relatively insignificant contribution of these sources in major power systems, and consequently due to the lack of appropriate techniques. Renewable energy sources have the potential to play a significant role in the electrical energy requirements of small isolated power systems which are primarily supplied by costly diesel fuel. A relatively high renewable energy penetration can significantly reduce the system fuel costs but can also have considerable impact on the system reliability. Small isolated systems routinely plan their generating facilities using deterministic adequacy methods that cannot incorporate the highly erratic behavior of renewable energy sources. The utilization of a single probabilistic risk index has not been generally accepted in small isolated system evaluation despite its utilization in most large power utilities. Deterministic and probabilistic techniques are combined in this thesis using a system well-being approach to provide useful adequacy indices for small isolated systems that include renewable energy. This thesis presents an evaluation model for small isolated systems containing renewable energy sources by integrating simulation models that generate appropriate atmospheric data, evaluate chronological renewable power outputs and combine total available energy and load to provide useful system indices. A software tool SIPSREL+ has been developed which generates risk, well-being and energy based indices to provide realistic cost/reliability measures of utilizing renewable energy. The concepts presented and the examples illustrated in this thesis will help system planners to decide on appropriate installation sites, the types and mix of different energy generating sources, the optimum operating policies, and the optimum generation expansion plans required to meet increasing load demands in small isolated power systems containing photovoltaic and wind energy sources.

  15. 78 FR 38311 - Reliability Technical Conference Agenda

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-26

    ... issues related to the reliability of the Bulk-Power System. The agenda for this conference is attached... Reliability Technical Docket No. AD13-6-000 Conference. North American Electric Docket No. RC11-6-004 Reliability Corporation. North American Electric Docket No. RR13-2-000 Reliability Corporation. Not...

  16. Reliability Issues in Stirling Radioisotope Power Systems

    NASA Technical Reports Server (NTRS)

    Schreiber, Jeffrey; Shah, Ashwin

    2005-01-01

    Stirling power conversion is a potential candidate for use in a Radioisotope Power System (RPS) for space science missions because it offers a multifold increase in the conversion efficiency of heat to electric power and reduced requirement of radioactive material. Reliability of an RPS that utilizes Stirling power conversion technology is important in order to ascertain long term successful performance. Owing to long life time requirement (14 years), it is difficult to perform long-term tests that encompass all the uncertainties involved in the design variables of components and subsystems comprising the RPS. The requirement for uninterrupted performance reliability and related issues are discussed, and some of the critical areas of concern are identified. An overview of the current on-going efforts to understand component life, design variables at the component and system levels, and related sources and nature of uncertainties are also discussed. Current status of the 110 watt Stirling Radioisotope Generator (SRG110) reliability efforts is described. Additionally, an approach showing the use of past experience on other successfully used power systems to develop a reliability plan for the SRG110 design is outlined.

  17. Reliability Issues in Stirling Radioisotope Power Systems

    NASA Technical Reports Server (NTRS)

    Shah, Ashwin R.; Schreiber, Jeffrey G.

    2004-01-01

    Stirling power conversion is a potential candidate for use in a Radioisotope Power System (RPS) for space science missions because it offers a multifold increase in the conversion efficiency of heat to electric power and reduced requirement of radioactive material. Reliability of an RPS that utilizes Stirling power conversion technology is important in order to ascertain long term successful performance. Owing to long life time requirement (14 years), it is difficult to perform long-term tests that encompass all the uncertainties involved in the design variables of components and subsystems comprising the RPS. The requirement for uninterrupted performance reliability and related issues are discussed, and some of the critical areas of concern are identified. An overview of the current on-going efforts to understand component life, design variables at the component and system levels, and related sources and nature of uncertainties are also discussed. Current status of the 110 watt Stirling Radioisotope Generator (SRG110) reliability efforts is described. Additionally, an approach showing the use of past experience on other successfully used power systems to develop a reliability plan for the SRG110 design is outlined.

  18. 76 FR 16263 - Revision to Electric Reliability Organization Definition of Bulk Electric System

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-23

    ...'s Reliability Standards Development Process, to revise its definition of the term ``bulk electric... definition of ``bulk electric system'' through the NERC Standards Development Process to address the... undertake the process of revising the bulk electric system definition to address the Commission's concerns...

  19. 76 FR 71011 - Reliability Technical Conference Agenda

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-16

    ... Reliability Technical Conference. Docket No. AD12-1-000 North American Electric Docket No. RC11-6-000... Chief Executive Officer, North American Electric Reliability Corporation (NERC) Kevin Burke, Chairman... and Reliability, American Public Power Association (APPA); NERC Standards Committee Chairman Deborah...

  20. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shahidehpour, Mohammad

    Starting in October 2008, Illinois Institute of Technology (IIT), in collaboration with over 20 participating members, led an extensive effort to develop, demonstrate, promote, and commercialize a microgrid system and offer supporting technologies that will achieve Perfect Power at the main campus of IIT. A Perfect Power system, as defined by the Galvin Electricity Initiative (GEI), is a system that cannot fail to meet the electric needs of the individual end-user. The Principle Investigator of this Perfect Power project was Dr. Mohammad Shahidehpour, Director of the Robert W. Galvin Center for Electricity Innovation at IIT. There were six overall objectivesmore » of the Perfect Power project: (1) Demonstrate the higher reliability introduced by the microgrid system at IIT; (2) Demonstrate the economics of microgrid operations; (3) Allow for a decrease of fifty percent (50%) of grid electricity load; (4) Create a permanent twenty percent (20%) decrease in peak load from 2007 level; (5) Defer planned substation through load reduction; (6) Offer a distribution system design that can be replicated in urban communities.« less

  1. A Tale of Two Cities: Greensburg Resurrected as a National Model for Green Communities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shelley Gonzales

    This fact sheet provides a summary of how NREL's technical assistance in Greensburg, Kansas, helped the town rebuild green after recovering from a tornado in May 2007. To help local distributed system owners get the most value for electricity sent back to the grid, NREL drafted safety and reliability ordinances, an interconnection agreement, and net-metering policies for the city to consider. NREL and the Energy Department also assisted with wind energy resource analysis, feasibility studies, and business plans.

  2. Energy Systems Integration: Data Call -- Become a Data Partner

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    2017-01-01

    This project aims to advance the understanding of costs associated with integrating PV onto the electric power distribution system while maintaining reliable grid operations. We have developed a bottom-up framework for calculating these costs as a function of PV penetration levels on specific feeders. This framework will used to inform and improve utility planning decisions, increase the transparency and speed associated with the interconnection process, and provide policymakers with more information on the total cost of energy from PV.

  3. NASA Electronic Parts and Packaging (NEPP): Space Qualification Guidelines of Optoelectronic and Photonic Devices for Optical Communication Systems

    NASA Technical Reports Server (NTRS)

    Kim, Quiesup

    2001-01-01

    Key elements of space qualification of opto-electric and photonic optical devices were overviewed. Efforts were concentrated on the reliability concerns of the devices needed for potential applications in space environments. The ultimate goal for this effort is to gradually establish enough data to develop a space qualification plan of newly developed specific photonic parts using empirical and numerical models to assess the life-time and degradation of the devices for potential long term space missions.

  4. Final Report to the National Energy Technology Laboratory on FY09-FY13 Cooperative Research with the Consortium for Electric Reliability Technology Solutions

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vittal, Vijay

    2015-11-04

    The Consortium for Electric Reliability Technology Solutions (CERTS) was formed in 1999 in response to a call from U.S. Congress to restart a federal transmission reliability R&D program to address concerns about the reliability of the U.S. electric power grid. CERTS is a partnership between industry, universities, national laboratories, and government agencies. It researches, develops, and disseminates new methods, tools, and technologies to protect and enhance the reliability of the U.S. electric power system and the efficiency of competitive electricity markets. It is funded by the U.S. Department of Energy’s Office of Electricity Delivery and Energy Reliability (OE). This reportmore » provides an overview of PSERC and CERTS, of the overall objectives and scope of the research, a summary of the major research accomplishments, highlights of the work done under the various elements of the NETL cooperative agreement, and brief reports written by the PSERC researchers on their accomplishments, including research results, publications, and software tools.« less

  5. Near-term implications of a ban on new coal-fired power plants in the United States.

    PubMed

    Newcomer, Adam; Apt, Jay

    2009-06-01

    Large numbers of proposed new coal power generators in the United States have been canceled, and some states have prohibited new coal power generators. We examine the effects on the U.S. electric power system of banning the construction of coal-fired electricity generators, which has been proposed as a means to reduce U.S. CO2 emissions. The model simulates load growth, resource planning, and economic dispatch of the Midwest Independent Transmission System Operator (ISO), Inc., Electric Reliability Council of Texas (ERCOT), and PJM under a ban on new coal generation and uses an economic dispatch model to calculate the resulting changes in dispatch order, CO2 emissions, and fuel use under three near-term (until 2030) future electric power sector scenarios. A national ban on new coal-fired power plants does not lead to CO2 reductions of the scale required under proposed federal legislation such as Lieberman-Warner but would greatly increase the fraction of time when natural gas sets the price of electricity, even with aggressive wind and demand response policies.

  6. Application of urban neighborhoods in understanding of local level electricity consumption patterns

    NASA Astrophysics Data System (ADS)

    Roy Chowdhury, P. K.; Bhaduri, B. L.

    2017-12-01

    Aggregated national or regional level electricity consumption data fail to capture the spatial variation in consumption, a function of location, climate, topography, and local economics. Spatial monitoring of electricity usage patterns helps to understand derivers of location specific consumption behavior and develop models to cater to the consumer needs, plan efficiency measures, identify settled areas lacking access, and allows for future planning through assessing requirements. Developed countries have started to deploy sensor systems such as smart meters to gather information on local level consumption patterns, but such infrastructure is virtually nonexistent in developing nations, resulting in serious dearth of reliable data for planners and policy makers. Remote sensing of artificial nighttime lights from human settlements have proven useful to study electricity consumptions from global to regional scales, however, local level studies remain scarce. Using the differences in spatial characteristics among different urban neighborhoods such as industrial, commercial and residential, observable through very high resolution day time satellite images (<0.5 meter), formal urban neighborhoods have been generated through texture analysis. In this study, we explore the applicability of these urban neighborhoods in understanding local level electricity consumption patterns through exploring possible correlations between the spatial characteristics of these neighborhoods, associated general economic activities, and corresponding VIIRS day-night band (DNB) nighttime lights observations, which we use as a proxy for electricity consumption in the absence of ground level consumption data. The overall trends observed through this analysis provides useful explanations helping in understanding of broad electricity consumption patterns in urban areas lacking ground level observations. This study thus highlights possible application of remote sensing data driven methods in providing novel insights into local level socio-economic patterns that were hitherto undetected due to lack of ground data.

  7. 18 CFR 39.6 - Conflict of a Reliability Standard with a Commission Order.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT RULES CONCERNING CERTIFICATION OF THE ELECTRIC RELIABILITY ORGANIZATION; AND PROCEDURES FOR THE ESTABLISHMENT, APPROVAL, AND ENFORCEMENT OF ELECTRIC RELIABILITY STANDARDS § 39.6 Conflict of a Reliability Standard with...

  8. 2017 NREL Photovoltaic Reliability Workshop

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kurtz, Sarah

    NREL's Photovoltaic (PV) Reliability Workshop (PVRW) brings together PV reliability experts to share information, leading to the improvement of PV module reliability. Such improvement reduces the cost of solar electricity and promotes investor confidence in the technology -- both critical goals for moving PV technologies deeper into the electricity marketplace.

  9. 75 FR 51025 - Application to Export Electric Energy; Vitol Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-18

    ... adversely impact on the reliability of the U.S. electric power supply system. Copies of this application... DEPARTMENT OF ENERGY [OE Docket No. EA-370] Application to Export Electric Energy; Vitol Inc. AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of application...

  10. Photovoltaic Module Reliability Workshop 2011: February 16-17, 2011

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kurtz, S.

    2013-11-01

    NREL's Photovoltaic (PV) Module Reliability Workshop (PVMRW) brings together PV reliability experts to share information, leading to the improvement of PV module reliability. Such improvement reduces the cost of solar electricity and promotes investor confidence in the technology--both critical goals for moving PV technologies deeper into the electricity marketplace.

  11. Photovoltaic Module Reliability Workshop 2014: February 25-26, 2014

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kurtz, S.

    2014-02-01

    NREL's Photovoltaic (PV) Module Reliability Workshop (PVMRW) brings together PV reliability experts to share information, leading to the improvement of PV module reliability. Such improvement reduces the cost of solar electricity and promotes investor confidence in the technology--both critical goals for moving PV technologies deeper into the electricity marketplace.

  12. Photovoltaic Module Reliability Workshop 2013: February 26-27, 2013

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kurtz, S.

    2013-10-01

    NREL's Photovoltaic (PV) Module Reliability Workshop (PVMRW) brings together PV reliability experts to share information, leading to the improvement of PV module reliability. Such improvement reduces the cost of solar electricity and promotes investor confidence in the technology--both critical goals for moving PV technologies deeper into the electricity marketplace.

  13. Photovoltaic Module Reliability Workshop 2010: February 18-19, 2010

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kurtz, J.

    2013-11-01

    NREL's Photovoltaic (PV) Module Reliability Workshop (PVMRW) brings together PV reliability experts to share information, leading to the improvement of PV module reliability. Such improvement reduces the cost of solar electricity and promotes investor confidence in the technology--both critical goals for moving PV technologies deeper into the electricity marketplace.

  14. 2016 NREL Photovoltaic Module Reliability Workshop

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kurtz, Sarah

    NREL's Photovoltaic (PV) Module Reliability Workshop (PVMRW) brings together PV reliability experts to share information, leading to the improvement of PV module reliability. Such improvement reduces the cost of solar electricity and promotes investor confidence in the technology - both critical goals for moving PV technologies deeper into the electricity marketplace.

  15. 2015 NREL Photovoltaic Module Reliability Workshops

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kurtz, Sarah

    NREL's Photovoltaic (PV) Module Reliability Workshop (PVMRW) brings together PV reliability experts to share information, leading to the improvement of PV module reliability. Such improvement reduces the cost of solar electricity and promotes investor confidence in the technology--both critical goals for moving PV technologies deeper into the electricity marketplace.

  16. 76 FR 73607 - Agency Information Collection Activities: Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-29

    ... Request AGENCY: Office of Electricity Delivery and Energy Reliability (OE), U.S. Department of Energy (DOE). ACTION: Notice and Request for OMB Review and Comment. SUMMARY: The Office of Electricity Delivery and... Copeland, Office of Electricity Delivery and Energy Reliability (Attn: Comments on OE-417 Electric...

  17. Microgrids and distributed generation systems: Control, operation, coordination and planning

    NASA Astrophysics Data System (ADS)

    Che, Liang

    Distributed Energy Resources (DERs) which include distributed generations (DGs), distributed energy storage systems, and adjustable loads are key components in microgrid operations. A microgrid is a small electric power system integrated with on-site DERs to serve all or some portion of the local load and connected to the utility grid through the point of common coupling (PCC). Microgrids can operate in both grid-connected mode and island mode. The structure and components of hierarchical control for a microgrid at Illinois Institute of Technology (IIT) are discussed and analyzed. Case studies would address the reliable and economic operation of IIT microgrid. The simulation results of IIT microgrid operation demonstrate that the hierarchical control and the coordination strategy of distributed energy resources (DERs) is an effective way of optimizing the economic operation and the reliability of microgrids. The benefits and challenges of DC microgrids are addressed with a DC model for the IIT microgrid. We presented the hierarchical control strategy including the primary, secondary, and tertiary controls for economic operation and the resilience of a DC microgrid. The simulation results verify that the proposed coordinated strategy is an effective way of ensuring the resilient response of DC microgrids to emergencies and optimizing their economic operation at steady state. The concept and prototype of a community microgrid that interconnecting multiple microgrids in a community are proposed. Two works are conducted. For the coordination, novel three-level hierarchical coordination strategy to coordinate the optimal power exchanges among neighboring microgrids is proposed. For the planning, a multi-microgrid interconnection planning framework using probabilistic minimal cut-set (MCS) based iterative methodology is proposed for enhancing the economic, resilience, and reliability signals in multi-microgrid operations. The implementation of high-reliability microgrids requires proper protection schemes that effectively function in both grid-connected and island modes. This chapter presents a communication-assisted four-level hierarchical protection strategy for high-reliability microgrids, and tests the proposed protection strategy based on a loop structured microgrid. The simulation results demonstrate the proposed strategy to be an effective and efficient option for microgrid protection. Additionally, microgrid topology ought to be optimally planned. To address the microgrid topology planning, a graph-partitioning and integer-programming integrated methodology is proposed. This work is not included in the dissertation. Interested readers can refer to our related publication.

  18. A Quantitative Assessment of Utility Reporting Practices for Reporting Electric Power Distribution Events

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hamachi La Commare, Kristina

    Metrics for reliability, such as the frequency and duration of power interruptions, have been reported by electric utilities for many years. This study examines current utility practices for collecting and reporting electricity reliability information and discusses challenges that arise in assessing reliability because of differences among these practices. The study is based on reliability information for year 2006 reported by 123 utilities in 37 states representing over 60percent of total U.S. electricity sales. We quantify the effects that inconsistencies among current utility reporting practices have on comparisons of System Average Interruption Duration Index (SAIDI) and System Average Interruption Frequency Indexmore » (SAIFI) reported by utilities. We recommend immediate adoption of IEEE Std. 1366-2003 as a consistent method for measuring and reporting reliability statistics.« less

  19. Photovoltaic Module Reliability Workshop 2012: February 28 - March 1, 2012

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kurtz, S.

    2013-11-01

    NREL's Photovoltaic (PV) Module Reliability Workshop (PVMRW) brings together PV reliability experts to share information, leading to the improvement of PV module reliability. Such improvement reduces the cost of solar electricity and promotes investor confidence in the technology--both critical goals for moving PV technologies deeper into the electricity marketplace.

  20. Inventing the future of reliability: FERC's recent orders and the consolidation of reliability authority

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Skees, J. Daniel

    2010-06-15

    The Energy Policy Act of 2005 established mandatory reliability standard enforcement under a system in which the Federal Energy Regulatory Commission and the Electric Reliability Organization would have their own spheres of responsibility and authority. Recent orders, however, reflect the Commission's frustration with the reliability standard drafting process and suggest that the Electric Reliability Organization's discretion is likely to receive less deference in the future. (author)

  1. 75 FR 41166 - Office of Electricity Delivery and Energy Reliability; Notice of Reestablishment of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-15

    ... DEPARTMENT OF ENERGY Office of Electricity Delivery and Energy Reliability; Notice of Reestablishment of the Electricity Advisory Committee Pursuant to Section 14(a)(2)(A) of the Federal Advisory... Administration, notice is hereby given that the Electricity Advisory Committee has been reestablished for a two...

  2. Battery energy-storage systems — an emerging market for lead/acid batteries

    NASA Astrophysics Data System (ADS)

    Cole, J. F.

    Although the concept of using batteries for lead levelling and peak shaving has been known for decades, only recently have these systems become commercially viable. Changes in the structure of the electric power supply industry have required these companies to seek more cost-effective ways of meeting the needs of their customers. Through experience gained, primarily in the USA, batteries have been shown to provide multiple benefits to electric utilities. Also, lower maintenance batteries, more reliable electrical systems, and the availability of methods to predict costs and benefits have made battery energy-storage systems more attractive. Technology-transfer efforts in the USA have resulted in a willingness of electric utilities to install a number of these systems for a variety of tasks, including load levelling, peak shaving, frequency regulation and spinning reserve. Additional systems are being planned for several additional locations for similar applications, plus transmission and distribution deferral and enhanced power quality. In the absence of US champions such as the US Department of Energy and the Electric Power Research Institute, ILZRO is attempting to mount a technology-transfer programme to bring the benefits of battery energy-storage to European power suppliers. As a result of these efforts, a study group on battery energy-storage systems has been established with membership primarily in Germany and Austria. Also, a two-day workshop, prepared by the Electric Power Research Institute was held in Dublin. Participants included representatives of several European power suppliers. As a result, ESB National Grid of Ireland has embarked upon a detailed analysis of the costs and benefits of a battery energy-storage system in their network. Plans for the future include continuation of this technology-transfer effort, assistance in the Irish effort, and a possible approach to the European Commission for funding.

  3. Security attack detection algorithm for electric power gis system based on mobile application

    NASA Astrophysics Data System (ADS)

    Zhou, Chao; Feng, Renjun; Wang, Liming; Huang, Wei; Guo, Yajuan

    2017-05-01

    Electric power GIS is one of the key information technologies to satisfy the power grid construction in China, and widely used in power grid construction planning, weather, and power distribution management. The introduction of electric power GIS based on mobile applications is an effective extension of the geographic information system that has been widely used in the electric power industry. It provides reliable, cheap and sustainable power service for the country. The accurate state estimation is the important conditions to maintain the normal operation of the electric power GIS. Recent research has shown that attackers can inject the complex false data into the power system. The injection attack of this new type of false data (load integrity attack LIA) can successfully bypass the routine detection to achieve the purpose of attack, so that the control center will make a series of wrong decision. Eventually, leading to uneven distribution of power in the grid. In order to ensure the safety of the electric power GIS system based on mobile application, it is very important to analyze the attack mechanism and propose a new type of attack, and to study the corresponding detection method and prevention strategy in the environment of electric power GIS system based on mobile application.

  4. Daily Peak Load Forecasting of Next Day using Weather Distribution and Comparison Value of Each Nearby Date Data

    NASA Astrophysics Data System (ADS)

    Ito, Shigenobu; Yukita, Kazuto; Goto, Yasuyuki; Ichiyanagi, Katsuhiro; Nakano, Hiroyuki

    By the development of industry, in recent years; dependence to electric energy is growing year by year. Therefore, reliable electric power supply is in need. However, to stock a huge amount of electric energy is very difficult. Also, there is a necessity to keep balance between the demand and supply, which changes hour after hour. Consequently, to supply the high quality and highly dependable electric power supply, economically, and with high efficiency, there is a need to forecast the movement of the electric power demand carefully in advance. And using that forecast as the source, supply and demand management plan should be made. Thus load forecasting is said to be an important job among demand investment of electric power companies. So far, forecasting method using Fuzzy logic, Neural Net Work, Regression model has been suggested for the development of forecasting accuracy. Those forecasting accuracy is in a high level. But to invest electric power in higher accuracy more economically, a new forecasting method with higher accuracy is needed. In this paper, to develop the forecasting accuracy of the former methods, the daily peak load forecasting method using the weather distribution of highest and lowest temperatures, and comparison value of each nearby date data is suggested.

  5. Electricity from fossil fuels without CO2 emissions: assessing the costs of carbon dioxide capture and sequestration in U.S. electricity markets.

    PubMed

    Johnson, T L; Keith, D W

    2001-10-01

    The decoupling of fossil-fueled electricity production from atmospheric CO2 emissions via CO2 capture and sequestration (CCS) is increasingly regarded as an important means of mitigating climate change at a reasonable cost. Engineering analyses of CO2 mitigation typically compare the cost of electricity for a base generation technology to that for a similar plant with CO2 capture and then compute the carbon emissions mitigated per unit of cost. It can be hard to interpret mitigation cost estimates from this plant-level approach when a consistent base technology cannot be identified. In addition, neither engineering analyses nor general equilibrium models can capture the economics of plant dispatch. A realistic assessment of the costs of carbon sequestration as an emissions abatement strategy in the electric sector therefore requires a systems-level analysis. We discuss various frameworks for computing mitigation costs and introduce a simplified model of electric sector planning. Results from a "bottom-up" engineering-economic analysis for a representative U.S. North American Electric Reliability Council (NERC) region illustrate how the penetration of CCS technologies and the dispatch of generating units vary with the price of carbon emissions and thereby determine the relationship between mitigation cost and emissions reduction.

  6. Electricity from Fossil Fuels without CO2 Emissions: Assessing the Costs of Carbon Dioxide Capture and Sequestration in U.S. Electricity Markets.

    PubMed

    Johnson, Timothy L; Keith, David W

    2001-10-01

    The decoupling of fossil-fueled electricity production from atmospheric CO 2 emissions via CO 2 capture and sequestration (CCS) is increasingly regarded as an important means of mitigating climate change at a reasonable cost. Engineering analyses of CO 2 mitigation typically compare the cost of electricity for a base generation technology to that for a similar plant with CO 2 capture and then compute the carbon emissions mitigated per unit of cost. It can be hard to interpret mitigation cost estimates from this plant-level approach when a consistent base technology cannot be identified. In addition, neither engineering analyses nor general equilibrium models can capture the economics of plant dispatch. A realistic assessment of the costs of carbon sequestration as an emissions abatement strategy in the electric sector therefore requires a systems-level analysis. We discuss various frameworks for computing mitigation costs and introduce a simplified model of electric sector planning. Results from a "bottom-up" engineering-economic analysis for a representative U.S. North American Electric Reliability Council (NERC) region illustrate how the penetration of CCS technologies and the dispatch of generating units vary with the price of carbon emissions and thereby determine the relationship between mitigation cost and emissions reduction.

  7. Design and Operation of Power Systems with Large Amounts of Wind Power: Final Summary Report, IEA WIND Task 25, Phase Three 2012-2014

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Holttinen, Hannele; Kiviluoma, Juha; Forcione, Alain

    2016-06-01

    This report summarizes recent findings on wind integration from the 16 countries participating in the International Energy Agency (IEA) Wind collaboration research Task 25 in 2012-2014. Both real experience and studies are reported. The national case studies address several impacts of wind power on electric power systems. In this report, they are grouped under long-term planning issues and short-term operational impacts. Long-term planning issues include grid planning and capacity adequacy. Short-term operational impacts include reliability, stability, reserves, and maximizing the value in operational timescales (balancing related issues). The first section presents variability and uncertainty of power system-wide wind power, andmore » the last section presents recent wind integration studies for higher shares of wind power. Appendix 1 provides a summary of ongoing research in the national projects contributing to Task 25 in 2015-2017.« less

  8. 75 FR 35011 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-21

    ... Processes Manual Incorporating Proposed Revisions to the Reliability Standards Development Process. Filed..., June 21, 2010. Take notice that the Commission received the following electric reliability filings: Docket Numbers: RR10-12-000. Applicants: North American Electric Reliability Corp. Description: Petition...

  9. Extended performance electric propulsion power processor design study. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    Biess, J. J.; Inouye, L. Y.; Schoenfeld, A. D.

    1977-01-01

    Several power processor design concepts were evaluated and compared. Emphasis was placed on a 30cm ion thruster power processor with a beam supply rating of 2.2kW to 10kW. Extensions in power processor performance were defined and were designed in sufficient detail to determine efficiency, component weight, part count, reliability and thermal control. Preliminary electrical design, mechanical design, and thermal analysis were performed on a 6kW power transformer for the beam supply. Bi-Mod mechanical, structural, and thermal control configurations were evaluated for the power processor, and preliminary estimates of mechanical weight were determined. A program development plan was formulated that outlines the work breakdown structure for the development, qualification and fabrication of the power processor flight hardware.

  10. 18 CFR 39.2 - Jurisdiction and applicability.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT RULES CONCERNING CERTIFICATION OF THE ELECTRIC RELIABILITY ORGANIZATION; AND PROCEDURES FOR THE ESTABLISHMENT, APPROVAL, AND ENFORCEMENT OF ELECTRIC... and Hawaii), the Electric Reliability Organization, any Regional Entities, and all users, owners and...

  11. Structural Probability Concepts Adapted to Electrical Engineering

    NASA Technical Reports Server (NTRS)

    Steinberg, Eric P.; Chamis, Christos C.

    1994-01-01

    Through the use of equivalent variable analogies, the authors demonstrate how an electrical subsystem can be modeled by an equivalent structural subsystem. This allows the electrical subsystem to be probabilistically analyzed by using available structural reliability computer codes such as NESSUS. With the ability to analyze the electrical subsystem probabilistically, we can evaluate the reliability of systems that include both structural and electrical subsystems. Common examples of such systems are a structural subsystem integrated with a health-monitoring subsystem, and smart structures. Since these systems have electrical subsystems that directly affect the operation of the overall system, probabilistically analyzing them could lead to improved reliability and reduced costs. The direct effect of the electrical subsystem on the structural subsystem is of secondary order and is not considered in the scope of this work.

  12. Reliability Prediction Approaches For Domestic Intelligent Electric Energy Meter Based on IEC62380

    NASA Astrophysics Data System (ADS)

    Li, Ning; Tong, Guanghua; Yang, Jincheng; Sun, Guodong; Han, Dongjun; Wang, Guixian

    2018-01-01

    The reliability of intelligent electric energy meter is a crucial issue considering its large calve application and safety of national intelligent grid. This paper developed a procedure of reliability prediction for domestic intelligent electric energy meter according to IEC62380, especially to identify the determination of model parameters combining domestic working conditions. A case study was provided to show the effectiveness and validation.

  13. Near real-time analysis of tritium in treated water

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Skibo, A.

    The Tokyo Electric Power Company (TEPCO) is managing large quantities of treated water at the Fukushima Daiichi Nuclear Power Station. Moving forward, TEPCO will be discharging from the site clean water that meets agreed criteria. As part of agreements with stakeholders, TEPCO is planning to carefully monitor the water prior to discharge to assure compliance. The objective of this proposal is to support implementation of an on-line “real-time” (continuous or semi-continuous) tritium monitor that will reliably measure levels down to the agreed target 1500 Becquerels per liter (Bq/L).

  14. Hydrogen Fueling Station in Honolulu, Hawaii Feasibility Analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Porter Hill; Michael Penev

    2014-08-01

    The Department of Energy Hydrogen & Fuel Cells Program Plan (September 2011) identifies the use of hydrogen for government and fleet electric vehicles as a key step for achieving “reduced greenhouse gas emissions; reduced oil consumption; expanded use of renewable power …; highly efficient energy conversion; fuel flexibility …; reduced air pollution; and highly reliable grid-support.” This report synthesizes several pieces of existing information that can inform a decision regarding the viability of deploying a hydrogen (H2) fueling station at the Fort Armstrong site in Honolulu, Hawaii.

  15. 78 FR 15363 - Combined Notice of Filings #2

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-11

    ...-1173-001; ER12-1173-002. Applicants: PJM Interconnection, L.L.C., American Electric Power Service Corporation. Description: American Electric Power Service Corporation on behalf of Indiana Michigan Power... reliability filings. Docket Numbers: RD13-5-000. Applicants: North American Electric Reliability Corporation...

  16. Generating capacity in US electric utilities: How is it used? How much is needed over the decade

    NASA Astrophysics Data System (ADS)

    Keelin, T. W.; Oatman, E. N.; Gent, M. R.

    1982-10-01

    This report addresses: how US generating capacity is used to supply today's consumers with electricity; whether new capacity planned over the next decade is enough to provide a secure supply of electricity; how delays and cancellations of planned capacity would result in higher electricity costs and threaten the security of electricity supply; and how today's decisions determine electricity supply for the next decade and beyond. It is concluded that there is not an electricity supply crisis currently, but there is a planning crisis. This conclusion is based on the following: existing capacity supplies current needs, but provides little room for economic growth; new capacity is planned to provide a secure supply of electricity for the demand projected by utilities; if demand is lower, planned capacity will reduce costs and, if demand is higher, planned capacity will not be adequate; planned capacity may not be realized.

  17. Multistage Stochastic Programming and its Applications in Energy Systems Modeling and Optimization

    NASA Astrophysics Data System (ADS)

    Golari, Mehdi

    Electric energy constitutes one of the most crucial elements to almost every aspect of life of people. The modern electric power systems face several challenges such as efficiency, economics, sustainability, and reliability. Increase in electrical energy demand, distributed generations, integration of uncertain renewable energy resources, and demand side management are among the main underlying reasons of such growing complexity. Additionally, the elements of power systems are often vulnerable to failures because of many reasons, such as system limits, weak conditions, unexpected events, hidden failures, human errors, terrorist attacks, and natural disasters. One common factor complicating the operation of electrical power systems is the underlying uncertainties from the demands, supplies and failures of system components. Stochastic programming provides a mathematical framework for decision making under uncertainty. It enables a decision maker to incorporate some knowledge of the intrinsic uncertainty into the decision making process. In this dissertation, we focus on application of two-stage and multistage stochastic programming approaches to electric energy systems modeling and optimization. Particularly, we develop models and algorithms addressing the sustainability and reliability issues in power systems. First, we consider how to improve the reliability of power systems under severe failures or contingencies prone to cascading blackouts by so called islanding operations. We present a two-stage stochastic mixed-integer model to find optimal islanding operations as a powerful preventive action against cascading failures in case of extreme contingencies. Further, we study the properties of this problem and propose efficient solution methods to solve this problem for large-scale power systems. We present the numerical results showing the effectiveness of the model and investigate the performance of the solution methods. Next, we address the sustainability issue considering the integration of renewable energy resources into production planning of energy-intensive manufacturing industries. Recently, a growing number of manufacturing companies are considering renewable energies to meet their energy requirements to move towards green manufacturing as well as decreasing their energy costs. However, the intermittent nature of renewable energies imposes several difficulties in long term planning of how to efficiently exploit renewables. In this study, we propose a scheme for manufacturing companies to use onsite and grid renewable energies provided by their own investments and energy utilities as well as conventional grid energy to satisfy their energy requirements. We propose a multistage stochastic programming model and study an efficient solution method to solve this problem. We examine the proposed framework on a test case simulated based on a real-world semiconductor company. Moreover, we evaluate long-term profitability of such scheme via so called value of multistage stochastic programming.

  18. Electric Motor Thermal Management R&D (Presentation)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bennion, K.

    2014-11-01

    Thermal constraints place significant limitations on how electric motors ultimately perform. Without the ability to remove heat, the motor cannot operate without sacrificing performance, efficiency, and reliability. Finite element analysis and computational fluid dynamics modeling approaches are being increasingly utilized in the design and analysis of electric motors. As the models become more sophisticated, it is important to have detailed and accurate knowledge of both the passive thermal performance and the active cooling performance. In this work, we provide an overview of research characterizing both passive and active thermal elements related to electric motor thermal management. To better characterize themore » passive thermal performance, the effective thermal properties and inter-lamination thermal contact resistances were measured for different stator lamination materials. The active cooling performance of automatic transmission fluid (ATF) jets was also measured to better understand the heat transfer coefficients of ATF impinging on motor copper windings. Ford's Mercon LV was the ATF evaluated in this study. The presentation provides an overview of prior work with a focus on describing future plans for research to be performed during FY15.« less

  19. Performance Issues for a Changing Electric Power Industry

    EIA Publications

    1995-01-01

    Provides an overview of some of the factors affecting reliability within the electric bulk power system. Historical and projected data related to reliability issues are discussed on a national and regional basis. Current research on economic considerations associated with reliability levels is also reviewed.

  20. Near-term implications of a ban on new coal-fired power plants in the United States

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Adam Newcomer; Jay Apt

    2009-06-15

    Large numbers of proposed new coal power generators in the United States have been cancelled, and some states have prohibited new coal power generators. We examine the effects on the U.S. electric power system of banning the construction of coal-fired electricity generators, which has been proposed as a means to reduce U.S. CO{sub 2} emissions. The model simulates load growth, resource planning, and economic dispatch of the Midwest Independent Transmission System Operator (ISO), Inc., Electric Reliability Council of Texas (ERCOT), and PJM under a ban on new coal generation and uses an economic dispatch model to calculate the resulting changesmore » in dispatch order, CO{sub 2} emissions, and fuel use under three near-term (until 2030) future electric power sector scenarios. A national ban on new coal-fired power plants does not lead to CO{sub 2} reductions of the scale required under proposed federal legislation such as Lieberman-Warner but would greatly increase the fraction of time when natural gas sets the price of electricity, even with aggressive wind and demand response policies. 50 refs., 5 figs., 4 tabs.« less

  1. 77 FR 49441 - Electricity Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-16

    ... recommendations to the Assistant Secretary for Electricity Delivery and Energy Reliability on programs to modernize the Nation's electric power system. Additionally, the renewal of the EAC has been determined to be... Energy Reliability, Department of Energy. ACTION: Notice of Renewal. SUMMARY: Pursuant to Section 14(a)(2...

  2. 78 FR 48661 - Application for Presidential Permit; Soule River Hydroelectric Project: Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-09

    ... Hydroelectric Project: Correction AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of Application; correction. SUMMARY: The Department of Energy (DOE) Office of Electricity Delivery..., Office of Electricity Delivery and Energy Reliability (OE-20), U.S. Department of Energy, 1000...

  3. Challenges of deploying nuclear energy for power generation in Malaysia

    NASA Astrophysics Data System (ADS)

    Jaafar, Mohd Zamzam; Nazaruddin, Nurul Huda; Lye, Jonathan Tan Thiam

    2017-01-01

    Under the 10th Malaysia Plan (2010-2015) and the Economic Transformation Programme (ETP), nuclear energy was identified as a potential long-term option to be explored for electricity generation in Peninsular Malaysia. The energy sector in Malaysia currently faces several concerns including depleting domestic gas supply which will affect security and reliability of supply as well as overdependance on fossil fuels - mainly gas and imported coal, and nuclear energy may offer a possible solution to these issues as well as global climate change concern. Pursuing the nuclear option, Malaysia Nuclear Power Corporation (MNPC) is undertaking a series of comprehensive studies to facilitate an informed Government decision on the matter. This paper aims to discuss the many challenges towards the peaceful use of nuclear energy for electricity generation in the context of the New Energy Policy 2010 to achieve a balanced and sustainable energy mix. This effort will continue in the 11th Malaysia Plan (2016-2020) with emphasis on implementing a comprehensive communications plan and public awareness programme for the potential use of nuclear energy in the future. In analysing the challenges for the development of nuclear energy in Malaysia, the traditional triple bottom line (TBL) framework for sustainability, encompassing economic, social and environmental objectives is utilized. An additional factor, technical, is also included in the analysis to provide a more holistic view. It is opined that the main challenges of developing nuclear energy for electricity generation in a newcomer country like Malaysia can be attributed primarily to domestic non-technical factors compared to the technical factor.

  4. NovoTTF™-100A System (Tumor Treating Fields) transducer array layout planning for glioblastoma: a NovoTAL™ system user study.

    PubMed

    Chaudhry, Aafia; Benson, Laura; Varshaver, Michael; Farber, Ori; Weinberg, Uri; Kirson, Eilon; Palti, Yoram

    2015-11-11

    Optune™, previously known as the NovoTTF-100A System™, generates Tumor Treating Fields (TTFields), an effective anti-mitotic therapy for glioblastoma. The system delivers intermediate frequency, alternating electric fields to the supratentorial brain. Patient therapy is personalized by configuring transducer array layout placement on the scalp to the tumor site using MRI measurements and the NovoTAL System. Transducer array layout mapping optimizes therapy by maximizing electric field intensity to the tumor site. This study evaluated physician performance in conducting transducer array layout mapping using the NovoTAL System compared with mapping performed by the Novocure in-house clinical team. Fourteen physicians (7 neuro-oncologists, 4 medical oncologists, and 3 neurosurgeons) evaluated five blinded cases of recurrent glioblastoma and performed head size and tumor location measurements using a standard Digital Imaging and Communications in Medicine reader. Concordance with Novocure measurement and intra- and inter-rater reliability were assessed using relevant correlation coefficients. The study criterion for success was a concordance correlation coefficient (CCC) >0.80. CCC for each physician versus Novocure on 20 MRI measurements was 0.96 (standard deviation, SD ± 0.03, range 0.90-1.00), indicating very high agreement between the two groups. Intra- and inter-rater reliability correlation coefficients were similarly high: 0.83 (SD ±0.15, range 0.54-1.00) and 0.80 (SD ±0.18, range 0.48-1.00), respectively. This user study demonstrated an excellent level of concordance between prescribing physicians and Novocure in-house clinical teams in performing transducer array layout planning. Intra-rater reliability was very high, indicating reproducible performance. Physicians prescribing TTFields, when trained on the NovoTAL System, can independently perform transducer array layout mapping required for the initiation and maintenance of patients on TTFields therapy.

  5. Advancement of a 30K W Solar Electric Propulsion System Capability for NASA Human and Robotic Exploration Missions

    NASA Technical Reports Server (NTRS)

    Smith, Bryan K.; Nazario, Margaret L.; Manzella, David H.

    2012-01-01

    Solar Electric Propulsion has evolved into a demonstrated operational capability performing station keeping for geosynchronous satellites, enabling challenging deep-space science missions, and assisting in the transfer of satellites from an elliptical orbit Geostationary Transfer Orbit (GTO) to a Geostationary Earth Orbit (GEO). Advancing higher power SEP systems will enable numerous future applications for human, robotic, and commercial missions. These missions are enabled by either the increased performance of the SEP system or by the cost reductions when compared to conventional chemical propulsion systems. Higher power SEP systems that provide very high payload for robotic missions also trade favorably for the advancement of human exploration beyond low Earth orbit. Demonstrated reliable systems are required for human space flight and due to their successful present day widespread use and inherent high reliability, SEP systems have progressively become a viable entrant into these future human exploration architectures. NASA studies have identified a 30 kW-class SEP capability as the next appropriate evolutionary step, applicable to wide range of both human and robotic missions. This paper describes the planning options, mission applications, and technology investments for representative 30kW-class SEP mission concepts under consideration by NASA

  6. 78 FR 63172 - Commission Information Collection Activities (FERC-733); Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-23

    ... Electric Reliability Corporation (NERC) and EIA, to fielding and collecting data using a FERC designed... Commission in time to complete the 2014 report to Congress. NERC, as the Electric Reliability Organization... dispatchable and non-dispatchable resources that it needs to conduct its reliability work. Reporting demand...

  7. 76 FR 35867 - Agency Information Collection Activities: Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-20

    ... Request AGENCY: Office of Electricity Delivery and Energy Reliability (OE), U.S. Department of Energy (DOE... Office of Electricity Delivery and Energy Reliability is soliciting comments on the proposed revisions... or by Fax 202-586-2623 is recommended. The mailing address is Office of Electricity Delivery and...

  8. 78 FR 11633 - Application To Export Electric Energy; ConocoPhillips Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-19

    ...Phillips Company AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of Application. SUMMARY: ConocoPhillips Company (CoP) has applied to renew its authority to transmit electric... Delivery and Energy Reliability, Mail Code: OE-20, U.S. Department of Energy, 1000 Independence Avenue SW...

  9. 75 FR 22579 - Application To Export Electric Energy; Morgan Stanley Capital Group Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-29

    ... Stanley Capital Group Inc. AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION...: Office of Electricity Delivery and Energy Reliability, Mail Code: OE-20, U.S. Department of Energy, 1000.... Zabrocki, Morgan Stanley & Co. Incorporated, 2000 Westchester Ave., Purchase, NY 10577 and Daniel E. Frank...

  10. 76 FR 67430 - Application To Export Electric Energy; Tenaska Power Services Co.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-01

    ... Services Co. AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of application. SUMMARY: Tenaska Power Services Co. (Tenaska) has applied to renew its authority to transmit... of Electricity Delivery and Energy Reliability, Mail Code: OE-20, U.S. Department of Energy, 1000...

  11. Energy and Environment Guide to Action - Chapter 7.1: Electricity Resource Planning and Procurement

    EPA Pesticide Factsheets

    Electricity resource planning includes power plants, electricity delivery, and end-use demand. Find more information on designing, implementing, and evaluating electricity resource planning policies. State success stories are included for reference.

  12. 10 CFR 500.3 - Electric regions-electric region groupings for reliability measurements under the Powerplant and...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Electric regions-electric region groupings for reliability measurements under the Powerplant and Industrial Fuel Use Act of 1978. 500.3 Section 500.3 Energy DEPARTMENT OF... Coordination Group (FCG)—24. 8. Middle South Utilities—25. 9. Southern Company—22, 23. 10. Gulf States Group—35...

  13. Materials Innovation for Next-Generation T&D Grid Components. Workshop Summary Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Taylor, Emmanuel; Kramer, Caroline; Marchionini, Brian

    The Materials Innovations for Next-Generation T&D Grid Components Workshop was co-sponsored by the U.S. Department of Energy (DOE) Office of Electricity Delivery and Energy Reliability and the Oak Ridge National Laboratory (ORNL) and held on August 26 27, 2015, at the ORNL campus in Oak Ridge, Tennessee. The workshop was planned and executed under the direction of workshop co-chair Dr. Kerry Cheung (DOE) and co-chair Dr. Dominic Lee (ORNL). The information contained herein is based on the results of the workshop, which was attended by nearly 50 experts from government, industry, and academia. The research needs and pathways described inmore » this report reflect the expert opinions of workshop participants, but they are not intended to represent the views of the entire electric power community.« less

  14. Advanced energy system program

    NASA Astrophysics Data System (ADS)

    Trester, K.

    1987-06-01

    The ogjectives are to design, develop, and demonstrate a natural-gas-fueled, highly recuperated, 50 kw Brayton-cycle cogeneration system for commercial, institutional, and multifamily residential applications. Recent marketing studies have shown that the Advanced Energy System (AES), with its many cost-effective features, has the potential to offer significant reductions in annual electrical and thermal energy costs to the consumer. Specific advantates of the system that result in low cost ownership are high electrical efficiency (34 percent, LHV), low maintenance, high reliability and long life (20 years). Significant technical features include: an integral turbogenerator with shaft-speed permanent magnet generator; a rotating assembly supported by compliant foil air bearings; a formed-tubesheet plate/fin recuperator with 91 percent effectiveness; and a bi-directional power conditioner to ultilize the generator for system startup. The planned introduction of catalytic combustion will further enhance the economic and ecological attractiveness.

  15. Concentrating solar thermal power.

    PubMed

    Müller-Steinhagen, Hans

    2013-08-13

    In addition to wind and photovoltaic power, concentrating solar thermal power (CSP) will make a major contribution to electricity provision from renewable energies. Drawing on almost 30 years of operational experience in the multi-megawatt range, CSP is now a proven technology with a reliable cost and performance record. In conjunction with thermal energy storage, electricity can be provided according to demand. To date, solar thermal power plants with a total capacity of 1.3 GW are in operation worldwide, with an additional 2.3 GW under construction and 31.7 GW in advanced planning stage. Depending on the concentration factors, temperatures up to 1000°C can be reached to produce saturated or superheated steam for steam turbine cycles or compressed hot gas for gas turbine cycles. The heat rejected from these thermodynamic cycles can be used for sea water desalination, process heat and centralized provision of chilled water. While electricity generation from CSP plants is still more expensive than from wind turbines or photovoltaic panels, its independence from fluctuations and daily variation of wind speed and solar radiation provides it with a higher value. To become competitive with mid-load electricity from conventional power plants within the next 10-15 years, mass production of components, increased plant size and planning/operating experience will be accompanied by technological innovations. On 30 October 2009, a number of major industrial companies joined forces to establish the so-called DESERTEC Industry Initiative, which aims at providing by 2050 15 per cent of European electricity from renewable energy sources in North Africa, while at the same time securing energy, water, income and employment for this region. Solar thermal power plants are in the heart of this concept.

  16. Autonomous, Decentralized Grid Architecture: Prosumer-Based Distributed Autonomous Cyber-Physical Architecture for Ultra-Reliable Green Electricity Networks

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2012-01-11

    GENI Project: Georgia Tech is developing a decentralized, autonomous, internet-like control architecture and control software system for the electric power grid. Georgia Tech’s new architecture is based on the emerging concept of electricity prosumers—economically motivated actors that can produce, consume, or store electricity. Under Georgia Tech’s architecture, all of the actors in an energy system are empowered to offer associated energy services based on their capabilities. The actors achieve their sustainability, efficiency, reliability, and economic objectives, while contributing to system-wide reliability and efficiency goals. This is in marked contrast to the current one-way, centralized control paradigm.

  17. Incorporating voltage security into the planning, operation and monitoring of restructured electric energy markets

    NASA Astrophysics Data System (ADS)

    Nair, Nirmal-Kumar

    As open access market principles are applied to power systems, significant changes are happening in their planning, operation and control. In the emerging marketplace, systems are operating under higher loading conditions as markets focus greater attention to operating costs than stability and security margins. Since operating stability is a basic requirement for any power system, there is need for newer tools to ensure stability and security margins being strictly enforced in the competitive marketplace. This dissertation investigates issues associated with incorporating voltage security into the unbundled operating environment of electricity markets. It includes addressing voltage security in the monitoring, operational and planning horizons of restructured power system. This dissertation presents a new decomposition procedure to estimate voltage security usage by transactions. The procedure follows physical law and uses an index that can be monitored knowing the state of the system. The expression derived is based on composite market coordination models that have both PoolCo and OpCo transactions, in a shared stressed transmission grid. Our procedure is able to equitably distinguish the impacts of individual transactions on voltage stability, at load buses, in a simple and fast manner. This dissertation formulates a new voltage stability constrained optimal power flow (VSCOPF) using a simple voltage security index. In modern planning, composite power system reliability analysis that encompasses both adequacy and security issues is being developed. We have illustrated the applicability of our VSCOPF into composite reliability analysis. This dissertation also delves into the various applications of voltage security index. Increasingly, FACT devices are being used in restructured markets to mitigate a variety of operational problems. Their control effects on voltage security would be demonstrated using our VSCOPF procedure. Further, this dissertation investigates the application of steady state voltage stability index to detect potential dynamic voltage collapse. Finally, this dissertation examines developments in representation, standardization, communication and exchange of power system data. Power system data is the key input to all analytical engines for system operation, monitoring and control. Data exchange and dissemination could impact voltage security evaluation and therefore needs to be critically examined.

  18. Comparison of Theoretical Stresses and Deflections of Multicell Wings with Experimental Results Obtained from Plastic Models

    NASA Technical Reports Server (NTRS)

    Zender, George W

    1956-01-01

    The experimental deflections and stresses of six plastic multicell-wing models of unswept, delta, and swept plan form are presented and compared with previously published theoretical results obtained by the electrical analog method. The comparisons indicate that the theory is reliable except for the evaluation of stresses in the vicinity of the leading edge of delta wings and the leading and trailing edges of swept wings. The stresses in these regions are questionable, apparently because of simplifications employed in idealizing the actual structure for theoretical purposes and because of local effects of concentrated loads.

  19. Proceedings of the American Power Conference. Volume 60-1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McBride, A.E.

    1998-12-01

    The American Power Conference, 60th annual meeting, 1998, addressed reliability and economy as related to technology for competition and globalization. The topics of the papers included needs and advances in power engineering education, global climate change, distributed generation, the critical role of the nations largest coal, nuclear and hydropower stations, advances in generation technology, financing electric power projects, successful deregulation, year 2000 outlook for equipment conflict with information and control, system planning, asset management, relay and communication, particulate and SO{sub x} control, environmental protection compliance strategies, fuel cells, gas turbines, renewable energy, steam turbines, and cost reduction strategies.

  20. Proceedings of the American Power Conference. Volume 60-2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McBride, A.E.

    1998-12-01

    The American Power Conference, 60th annual meeting, 1998, addressed reliability and economy as related to technology for competition and globalization. The topics of the papers included needs and advances in power engineering education, global climate change, distributed generation, the critical role of the nations largest coal, nuclear and hydropower stations, advances in generation technology, financing electric power projects, successful deregulation, year 2000 outlook for equipment conflict with information and control, system planning, asset management, relay and communication, particulate and SO{sub x} control, environmental protection compliance strategies, fuel cells, gas turbines, renewable energy, steam turbines, and cost reduction strategies.

  1. 75 FR 72664 - System Personnel Training Reliability Standards

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-26

    ...Under section 215 of the Federal Power Act, the Commission approves two Personnel Performance, Training and Qualifications (PER) Reliability Standards, PER-004-2 (Reliability Coordination--Staffing) and PER-005-1 (System Personnel Training), submitted to the Commission for approval by the North American Electric Reliability Corporation, the Electric Reliability Organization certified by the Commission. The approved Reliability Standards require reliability coordinators, balancing authorities, and transmission operators to establish a training program for their system operators, verify each of their system operators' capability to perform tasks, and provide emergency operations training to every system operator. The Commission also approves NERC's proposal to retire two existing PER Reliability Standards that are replaced by the standards approved in this Final Rule.

  2. Considering the total cost of electricity from sunlight and the alternatives

    DOE PAGES

    none,

    2015-04-15

    Photovoltaic (PV) electricity generation has grown to about 17 GW in the United States, corresponding to one tenth of the global capacity. Most deployment in the country has happened during the last 6 years. Reflecting back, in early 2008 this author and his collaborators James Mason and Ken Zweibel, published in Scientific American and in Energy Policy a Solar Grand Plan demonstrating the feasibility of renewable energy in providing 69% of the United States electricity demand by 2050, while reducing CO2 emissions by 60% from 2005 levels; the PV contribution to this plan was assessed to be 250 GW bymore » 2030 and 2900 GW by 2050 [1]. The DOE's more detailed SunShot vision study, released in 2012, showed the possibility of having 300 GW of PV installed in the United States by 2030, and 630 GW by 2050. Assessing the sustainability of such rapid growth of photovoltaics necessitates undertaking a careful analysis because PV markets largely are enabled by its promise to produce reliable electricity with minimum environmental burdens. Measurable aspects of sustainability include cost, resource availability, and environmental impact. The question of cost concerns the affordability of solar energy compared to other energy sources throughout the world. Environmental impacts include local-, regional-, and global-effects, as well as the usage of land and water, which must be considered in a comparable context over a long time, multigenerational horizon. As a result, the availability of material resources matters to current and future-generations under the constraint of affordability.« less

  3. 10 CFR 500.3 - Electric regions-electric region groupings for reliability measurements under the Powerplant and...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Areas (PSA's) as authorized by section 202(a) of the Federal Power Act except where noted. They will be... Reliability Council (NERC) region with historical coordination policies. (b) The PSA's referred to in the... with DOE for an official determination. Electric Region Groupings and FERC PSA's: 1. Allegheny Power...

  4. Reliability Analysis of the Electrical Control System of Subsea Blowout Preventers Using Markov Models

    PubMed Central

    Liu, Zengkai; Liu, Yonghong; Cai, Baoping

    2014-01-01

    Reliability analysis of the electrical control system of a subsea blowout preventer (BOP) stack is carried out based on Markov method. For the subsea BOP electrical control system used in the current work, the 3-2-1-0 and 3-2-0 input voting schemes are available. The effects of the voting schemes on system performance are evaluated based on Markov models. In addition, the effects of failure rates of the modules and repair time on system reliability indices are also investigated. PMID:25409010

  5. Methodology and estimation of the welfare impact of energy reforms on households in Azerbaijan

    NASA Astrophysics Data System (ADS)

    Klytchnikova, Irina

    This dissertation develops a new approach that enables policy-makers to analyze welfare gains from improvements in the quality of infrastructure services in developing countries where data are limited and supply is subject to interruptions. An application of the proposed model in the former Soviet Republic of Azerbaijan demonstrates how this approach can be used in welfare assessment of energy sector reforms. The planned reforms in Azerbaijan include a set of measures that will result in a significant improvement in supply reliability, accompanied by a significant increase in the prices of energy services so that they reach the cost recovery level. Currently, households in rural areas receive electricity and gas for only a few hours a day because of a severe deterioration of the energy infrastructure following the collapse of the Soviet Union. The reforms that have recently been initiated will have far-reaching poverty and distributional consequences for the country as they result in an improvement in supply reliability and an increase in energy prices. The new model of intermittent supply developed in this dissertation is based on the household production function approach and draws on previous research in the energy reliability literature. Since modern energy sources (network gas and electricity) in Azerbaijan are cleaner and cheaper than the traditional fuels (fuel wood, etc.), households choose modern fuels whenever they are available. During outages, they rely on traditional fuels. Theoretical welfare measures are derived from a system of fuel demands that takes into account the intermittent availability of energy sources. The model is estimated with the data from the Azerbaijan Household Energy Survey, implemented by the World Bank in December 2003/January 2004. This survey includes an innovative contingent behavior module in which the respondents were asked about their energy consumption patterns in specified reform scenarios. Estimation results strongly indicate that households in the areas with poor supply quality have a high willingness to pay for reliability improvements. However, a relatively small group of households may incur substantial welfare losses from an electricity price increase even when it is combined with a partial reliability improvement. Unlike an earlier assessment of the same reforms in Azerbaijan, analysis in this dissertation clearly shows that targeted investments in improving service reliability may be the best way to mitigate adverse welfare consequences of electricity price increases. Hence, policymakers should focus their attention on ensuring that quality improvements are a central component of power sector reforms. Survey evidence also shows that, although households may incur sizable welfare losses from indoor air pollution when they rely on traditional fuels, they do not recognize indoor air pollution as a factor contributing to the high incidence of respiratory illness among fuel wood users. Therefore, benefits may be greater if policy interventions that improve the reliability of modern energy sources are combined with an information campaign about the adverse health effects of fuel wood use. (Abstract shortened by UMI.)

  6. A model for estimation of potential generation of waste electrical and electronic equipment in Brazil

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Araujo, Marcelo Guimaraes, E-mail: marcel_g@uol.com.br; Magrini, Alessandra; Mahler, Claudio Fernando

    2012-02-15

    Highlights: Black-Right-Pointing-Pointer Literature of WEEE generation in developing countries is reviewed. Black-Right-Pointing-Pointer We analyse existing estimates of WEEE generation for Brazil. Black-Right-Pointing-Pointer We present a model for WEEE generation estimate. Black-Right-Pointing-Pointer WEEE generation of 3.77 kg/capita year for 2008 is estimated. Black-Right-Pointing-Pointer Use of constant lifetime should be avoided for non-mature market products. - Abstract: Sales of electrical and electronic equipment are increasing dramatically in developing countries. Usually, there are no reliable data about quantities of the waste generated. A new law for solid waste management was enacted in Brazil in 2010, and the infrastructure to treat this waste mustmore » be planned, considering the volumes of the different types of electrical and electronic equipment generated. This paper reviews the literature regarding estimation of waste electrical and electronic equipment (WEEE), focusing on developing countries, particularly in Latin America. It briefly describes the current WEEE system in Brazil and presents an updated estimate of generation of WEEE. Considering the limited available data in Brazil, a model for WEEE generation estimation is proposed in which different methods are used for mature and non-mature market products. The results showed that the most important variable is the equipment lifetime, which requires a thorough understanding of consumer behavior to estimate. Since Brazil is a rapidly expanding market, the 'boom' in waste generation is still to come. In the near future, better data will provide more reliable estimation of waste generation and a clearer interpretation of the lifetime variable throughout the years.« less

  7. Addressing Global Warming, Air Pollution, Energy Security, and Jobs with Roadmaps for Changing the All-Purpose Energy Infrastructure of the 50 United States

    NASA Astrophysics Data System (ADS)

    Jacobson, M. Z.

    2014-12-01

    Global warming, air pollution, and energy insecurity are three of the most significant problems facing the world today. This talk discusses the development of technical and economic plans to convert the energy infrastructure of each of the 50 United States to those powered by 100% wind, water, and sunlight (WWS) for all purposes, namely electricity, transportation, industry, and heating/cooling, after energy efficiency measures have been accounted for. The plans call for all new energy to be WWS by 2020, ~80% conversion of existing energy by 2030, and 100% by 2050 through aggressive policy measures and natural transition. Resource availability, footprint and spacing areas required, jobs created versus lost, energy costs, avoided costs from air pollution mortality and morbidity and climate damage, and methods of ensuring reliability of the grid are discussed. Please see http://web.stanford.edu/group/efmh/jacobson/Articles/I/WWS-50-USState-plans.html

  8. 78 FR 70163 - Communication of Operational Information between Natural Gas Pipelines and Electric Transmission...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-22

    ... a continued high level of reliability of interstate natural gas pipelines and that this will, in turn, ensure a continued high level of reliability of the electric transmission grid.\\40\\ Consumers...

  9. Climate Narratives: Combing multiple sources of information to develop risk management strategies for a municipal water utility

    NASA Astrophysics Data System (ADS)

    Yates, D. N.; Basdekas, L.; Rajagopalan, B.; Stewart, N.

    2013-12-01

    Municipal water utilities often develop Integrated Water Resource Plans (IWRP), with the goal of providing a reliable, sustainable water supply to customers in a cost-effective manner. Colorado Springs Utilities, a 5-service provider (potable and waste water, solid waste, natural gas and electricity) in Colorado USA, recently undertook an IWRP. where they incorporated water supply, water demand, water quality, infrastructure reliability, environmental protection, and other measures within the context of complex water rights, such as their critically important 'exchange potential'. The IWRP noted that an uncertain climate was one of the greatest sources of uncertainty to achieving a sustainable water supply to a growing community of users. We describe how historic drought, paleo-climate, and climate change projections were blended together into climate narratives that informed a suite of water resource systems models used by the utility to explore the vulnerabilities of their water systems.

  10. Technical Analysis Feasibility Study on Smart Microgrid System in Sekolah Tinggi Teknik PLN

    NASA Astrophysics Data System (ADS)

    Suyanto, Heri

    2018-02-01

    Nowadays application of new and renewable energy as main resource of power plant has greatly increased. High penetration of renewable energy into the grid will influence the quality and reliability of the electricity system, due to the intermittent characteristic of new and renewable energy resources. Smart grid or microgrid technology has the ability to deal with this intermittent characteristic especially if these renewable energy resources integrated to grid in large scale, so it can improve the reliability and efficiency of the grid. We plan to implement smart microgrid system at Sekolah Tinggi Teknik PLN as a pilot project. Before the pilot project start, the feasibility study must be conducted. In this feasibility study, the renewable energy resources and load characteristic at the site will be measured. Then the technical aspect of this feasibility study will be analyzed. This paper explains that analysis of ths feasibility study.

  11. The impact of water use fees on dispatching and water requirements for water-cooled power plants in Texas.

    PubMed

    Sanders, Kelly T; Blackhurst, Michael F; King, Carey W; Webber, Michael E

    2014-06-17

    We utilize a unit commitment and dispatch model to estimate how water use fees on power generators would affect dispatching and water requirements by the power sector in the Electric Reliability Council of Texas' (ERCOT) electric grid. Fees ranging from 10 to 1000 USD per acre-foot were separately applied to water withdrawals and consumption. Fees were chosen to be comparable in cost to a range of water supply projects proposed in the Texas Water Development Board's State Water Plan to meet demand through 2050. We found that these fees can reduce water withdrawals and consumption for cooling thermoelectric power plants in ERCOT by as much as 75% and 23%, respectively. To achieve these water savings, wholesale electricity generation costs might increase as much as 120% based on 2011 fuel costs and generation characteristics. We estimate that water saved through these fees is not as cost-effective as conventional long-term water supply projects. However, the electric grid offers short-term flexibility that conventional water supply projects do not. Furthermore, this manuscript discusses conditions under which the grid could be effective at "supplying" water, particularly during emergency drought conditions, by changing its operational conditions.

  12. Integrated Energy-Water Planning in the Western and Texas Interconnections (Invited)

    NASA Astrophysics Data System (ADS)

    Tidwell, V. C.

    2013-12-01

    While thermoelectric power generation accounts for less than one percent of total water consumption in the western U.S, steady growth in demand is projected for this sector. Complexities and heterogeneity in water supply, water demand, and institutional controls make water development a challenging proposition throughout the West. A consortium of National Laboratories, the University of Texas and the Electric Power Research Institute are working with the Western Governors' Association and Western States Water Council to assist the Western Electricity Coordinating Council and the Electric Reliability Council of Texas to integrate water related issues into long-term transmission planning. Specifically, water withdrawal and consumption have been estimated for each western power plant and their susceptibility to climate impacts assessed. To assist with transmission planning, water availability and cost data have been mapped at the 8-digit Hydrologic Unit Code level for the conterminous western U.S. (1208 watersheds). Five water sources were individually considered, including unappropriated surface water, unappropriated groundwater, appropriated water, municipal wastewater and brackish groundwater. Also mapped is projected growth in consumptive water demand to 2030. The relative costs (capital and O&M) to secure, convey, and treat the water as necessary have also been estimated for each source of water. These data configured into watershed level supply curves were subsequently used to constrain West-wide transmission planning. Results across a range of alternative energy futures indicate the impact of water availability and cost on the makeup and siting of future power generation. Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy's National Nuclear Security Administration under contract DE-AC04-94AL85000. Water budgets at a 8-digit HUC level constructed by aggregating available water (all five sources) and subtracting projected change in demand for 2010-2030.

  13. Reliability of solid-state lighting electrical drivers subjected to WHTOL accelerated aging

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lall, Pradeep; Sakalauku, Peter; Davis, Lynn

    An investigation of a solid-state lighting (SSL) luminaire with the focus on the electronic driver which has been exposed to a standard wet hot temperature operating life (WHTOL) of 85% RH and 85°C in order to assess reliability of prolonged exposer to a harsh environment has been conducted. SSL luminaires are beginning introduced as head lamps in some of today's luxury automobiles and may also be fulfilling a variety of important outdoor applications such as overhead street lamps, traffic signals and landscape lighting. SSL luminaires in these environments are almost certain to encounter excessive moisture from humidity and high temperaturesmore » for a persistent period of time. The lack of accelerated test methods for LEDs to assess long-term reliability prior to introduction into the marketplace, a need for SSL physics based PHM modeling indicators for assessment and prediction of LED life, as well as the U.S. Department of Energy's R&D roadmap to replace todays lighting with SSL luminaires makes it important to increase the understanding of the reliability of SSL devices, specifically, in harsh environment applications. In this work, a set of SSL electrical drivers were investigated to determine failure mechanisms that occur during prolonged harsh environment applications. Each driver consists of four aluminum electrolytic capacitors (AECs) of three different types and was considered the weakest component inside the SSL electrical driver. The reliability of the electrical driver was assessed by monitoring the change in capacitance and the change in equivalent series resistance for each AEC, as well as monitoring the luminous flux of the SSL luminaire or the output of the electrical driver. The luminous flux of a pristine SSL electrical driver was also monitored in order to detect minute changes in the electrical drivers output and to aid in the investigation of the SSL luminaires reliability. The failure mechanisms of the electrical drivers have been determined and are presented in this paper.« less

  14. Assessment of the present and future offshore wind power potential: a case study in a target territory of the Baltic Sea near the Latvian coast.

    PubMed

    Lizuma, Lita; Avotniece, Zanita; Rupainis, Sergejs; Teilans, Artis

    2013-01-01

    Offshore wind energy development promises to be a significant domestic renewable energy source in Latvia. The reliable prediction of present and future wind resources at offshore sites is crucial for planning and selecting the location for wind farms. The overall goal of this paper is the assessment of offshore wind power potential in a target territory of the Baltic Sea near the Latvian coast as well as the identification of a trend in the future wind energy potential for the study territory. The regional climate model CLM and High Resolution Limited Area Model (Hirlam) simulations were used to obtain the wind climatology data for the study area. The results indicated that offshore wind energy is promising for expanding the national electricity generation and will continue to be a stable resource for electricity generation in the region over the 21st century.

  15. System design of ELITE power processing unit

    NASA Astrophysics Data System (ADS)

    Caldwell, David J.

    The Electric Propulsion Insertion Transfer Experiment (ELITE) is a space mission planned for the mid 1990s in which technological readiness will be demonstrated for electric orbit transfer vehicles (EOTVs). A system-level design of the power processing unit (PPU), which conditions solar array power for the arcjet thruster, was performed to optimize performance with respect to reliability, power output, efficiency, specific mass, and radiation hardness. The PPU system consists of multiphased parallel switchmode converters, configured as current sources, connected directly from the array to the thruster. The PPU control system includes a solar array peak power tracker (PPT) to maximize the power delivered to the thruster regardless of variations in array characteristics. A stability analysis has been performed to verify that the system is stable despite the nonlinear negative impedance of the PPU input and the arcjet thruster. Performance specifications are given to provide the required spacecraft capability with existing technology.

  16. 78 FR 74126 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-10

    ... Installed Capacity Requirement, Hydro Quebec Interconnection Capability Credits and Related Values for the.... Take notice that the Commission received the following electric reliability filings: Docket Numbers: RR13-3-001. Applicants: North American Electric Reliability Corporation. Description: Compliance Filing...

  17. 77 FR 57563 - Combined Notice Of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-18

    .... Applicants: New York Independent System Operator, Inc., Niagara Mohawk Power Corporation. Description.... Take notice that the Commission received the following electric reliability filings: Docket Numbers: RR12-13-000. Applicants: North American Electric Reliability Corporation. Description: Update to...

  18. 76 FR 14006 - Sunshine Act Meeting Notice

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-15

    ... Matters. A-2 AD02-7-000 Customer Matters, Reliability, Security and Market Operations. Electric E-1 ER03-563-066 Devon Power LLC. E-2 OMITTED. E-3 NP10-18-000 North American Electric Reliability Corporation. [[Page 14007

  19. Research on Novel Algorithms for Smart Grid Reliability Assessment and Economic Dispatch

    NASA Astrophysics Data System (ADS)

    Luo, Wenjin

    In this dissertation, several studies of electric power system reliability and economy assessment methods are presented. To be more precise, several algorithms in evaluating power system reliability and economy are studied. Furthermore, two novel algorithms are applied to this field and their simulation results are compared with conventional results. As the electrical power system develops towards extra high voltage, remote distance, large capacity and regional networking, the application of a number of new technique equipments and the electric market system have be gradually established, and the results caused by power cut has become more and more serious. The electrical power system needs the highest possible reliability due to its complication and security. In this dissertation the Boolean logic Driven Markov Process (BDMP) method is studied and applied to evaluate power system reliability. This approach has several benefits. It allows complex dynamic models to be defined, while maintaining its easy readability as conventional methods. This method has been applied to evaluate IEEE reliability test system. The simulation results obtained are close to IEEE experimental data which means that it could be used for future study of the system reliability. Besides reliability, modern power system is expected to be more economic. This dissertation presents a novel evolutionary algorithm named as quantum evolutionary membrane algorithm (QEPS), which combines the concept and theory of quantum-inspired evolutionary algorithm and membrane computation, to solve the economic dispatch problem in renewable power system with on land and offshore wind farms. The case derived from real data is used for simulation tests. Another conventional evolutionary algorithm is also used to solve the same problem for comparison. The experimental results show that the proposed method is quick and accurate to obtain the optimal solution which is the minimum cost for electricity supplied by wind farm system.

  20. 7 CFR 1724.40 - General.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES Electric System Planning... long-term needs for plant additions, improvements, replacements, and retirements for their electric systems. The primary components of the planning system consist of long-range engineering plans and...

  1. Electric machine differential for vehicle traction control and stability control

    NASA Astrophysics Data System (ADS)

    Kuruppu, Sandun Shivantha

    Evolving requirements in energy efficiency and tightening regulations for reliable electric drivetrains drive the advancement of the hybrid electric (HEV) and full electric vehicle (EV) technology. Different configurations of EV and HEV architectures are evaluated for their performance. The future technology is trending towards utilizing distinctive properties in electric machines to not only to improve efficiency but also to realize advanced road adhesion controls and vehicle stability controls. Electric machine differential (EMD) is such a concept under current investigation for applications in the near future. Reliability of a power train is critical. Therefore, sophisticated fault detection schemes are essential in guaranteeing reliable operation of a complex system such as an EMD. The research presented here emphasize on implementation of a 4kW electric machine differential, a novel single open phase fault diagnostic scheme, an implementation of a real time slip optimization algorithm and an electric machine differential based yaw stability improvement study. The proposed d-q current signature based SPO fault diagnostic algorithm detects the fault within one electrical cycle. The EMD based extremum seeking slip optimization algorithm reduces stopping distance by 30% compared to hydraulic braking based ABS.

  2. 18 CFR 39.5 - Reliability Standards.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    .... 39.5 Section 39.5 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT RULES CONCERNING CERTIFICATION OF THE ELECTRIC RELIABILITY ORGANIZATION; AND PROCEDURES FOR THE ESTABLISHMENT, APPROVAL, AND ENFORCEMENT OF ELECTRIC...

  3. Metroliner Auxiliary Power Electrical System Reliability Study

    DOT National Transportation Integrated Search

    1971-06-01

    The reliability of the electrical system of any vehicle is greatly affected by the way the system is configured. The propulsion and braking systems of a train must be unaffected by failures occurring in the nonessential power areas. With these criter...

  4. Magnetically operated limit switch has improved reliability, minimizes arcing

    NASA Technical Reports Server (NTRS)

    Steiner, R.

    1966-01-01

    Limit switch for reliable, low-travel, snap action with negligible arcing uses an electrically nonconductive permanent magnet consisting of a ferrimagnetic ceramic and ferromagnetic pole shoes which form a magnetic and electrically conductive circuit with a ferrous-metal armature.

  5. The state of energy storage in electric utility systems and its effect on renewable energy resources

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rau, N S

    1994-08-01

    This report describes the state of the art of electric energy storage technologies and discusses how adding intermittent renewable energy technologies (IRETs) to a utility network affects the benefits from storage dispatch. Load leveling was the mode of storage dispatch examined in the study. However, the report recommended that other modes be examined in the future for kilowatt and kilowatt-hour optimization of storage. The motivation to install storage with IRET generation can arise from two considerations: reliability and enhancement of the value of energy. Because adding storage increases cost, reliability-related storage is attractive only if the accruing benefits exceed themore » cost of storage installation. The study revealed that the operation of storage should not be guided by the output of the IRET but rather by system marginal costs. Consequently, in planning studies to quantify benefits, storage should not be considered as an entity belonging to the system and not as a component of IRETS. The study also indicted that because the infusion of IRET energy tends to reduce system marginal cost, the benefits from load leveling (value of energy) would be reduced. However, if a system has storage, particularly if the storage is underutilized, its dispatch can be reoriented to enhance the benefits of IRET integration.« less

  6. Overview of the National Energy-Water System (NEWS) Assessment Framework Study

    NASA Astrophysics Data System (ADS)

    Vorosmarty, C. J.; Miara, A.; Rosenzweig, B.; Corsi, F.; Piasecki, M.; Celicourt, P.; Fekete, B. M.; Macknick, J.; Melillo, J. M.; Newmark, R. L.; Tidwell, V. C.; Suh, S.; Prousevitch, A.

    2015-12-01

    In practical terms, strategic planning for the nation's economic, social and environmental future increasingly centers on issues relating to fresh water. U.S. energy security is highly dependent on electricity generated by the nation's fleet of thermoelectric power stations, which today contribute 90% to total electricity production. This presentation summarizes the overall structure and recent progress on a study devoted to climate adaptation and the reliability of power sector infrastructure and operations, when viewed through the lens of strategic water issues. The focus is on electric power infrastructure, i.e., the types, spatial distributions and levels of investment in technologies that deliver or could deliver electricity to the U.S. economy. The work is guided by a central hypothesis, that today's portfolio of electric power sector infrastructure is unsustainable in the context of satisfying its water needs under anticipated climate change and rising electricity demands. Insofar as water-mediated feedbacks reverberate throughout the national economy, we include macro-economic perspectives as well. The work is organized around the technical development of the NEWS framework which is then used to evaluate, in the context of anticipated climate, economic change and regulatory context: the performance of the nation's electricity sector, the feasibility of alternative pathways to improve climate adaptation, and impacts of energy technology. Scenarios are co-designed with a stakeholder community, and investment tradeoffs are considered with respect to the productivity of the economy, water availability and aquatic ecosystem condition.

  7. Computer Based Decision Support Tool for Helicopter Mission Planning in Disaster Relief and Military Operations (Outil informatique d’aide a la decision pour la planification des missions d’helicopteres dans des operations militaires et de secours en cas de catastrophe)

    DTIC Science & Technology

    2008-06-01

    capacity planning; • Electrical generation capacity planning; • Machine scheduling; • Freight scheduling; • Dairy farm expansion planning...Support Systems and Multi Criteria Decision Analysis Products A.2.11.2.2.1 ELECTRE IS ELECTRE IS is a generalization of ELECTRE I. It is a...criteria, ELECTRE IS supports the user in the process of selecting one alternative or a subset of alternatives. The method consists of two parts

  8. 76 FR 17159 - Office of New Reactors; Final Interim Staff Guidance on Standard Review Plan, Section 17.4...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-28

    ... Interim Staff Guidance on Standard Review Plan, Section 17.4, ``Reliability Assurance Program'' AGENCY... design reliability assurance program (RAP). This ISG updates the guidance provided to the staff in Standard Review Plan (SRP), Section 17.4, ``Reliability Assurance Program,'' of NUREG-0800, ``Standard...

  9. Impacts of Demand-Side Resources on Electric Transmission Planning

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hadley, Stanton W.; Sanstad, Alan H.

    2015-01-01

    Will demand resources such as energy efficiency (EE), demand response (DR), and distributed generation (DG) have an impact on electricity transmission requirements? Five drivers for transmission expansion are discussed: interconnection, reliability, economics, replacement, and policy. With that background, we review the results of a set of transmission studies that were conducted between 2010 and 2013 by electricity regulators, industry representatives, and other stakeholders in the three physical interconnections within the United States. These broad-based studies were funded by the US Department of Energy and included scenarios of reduced load growth due to EE, DR, and DG. While the studies weremore » independent and used different modeling tools and interconnect-specific assumptions, all provided valuable results and insights. However, some caveats exist. Demand resources were evaluated in conjunction with other factors, and limitations on transmission additions between scenarios made understanding the role of demand resources difficult. One study, the western study, included analyses over both 10- and 20-year planning horizons; the 10-year analysis did not show near-term reductions in transmission, but the 20-year indicated fewer transmission additions, yielding a 36percent capital cost reduction. In the eastern study the reductions in demand largely led to reductions in local generation capacity and an increased opportunity for low-cost and renewable generation to export to other regions. The Texas study evaluated generation changes due to demand, and is in the process of examining demand resource impacts on transmission.« less

  10. 2025 California Demand Response Potential Study - Charting California’s Demand Response Future. Final Report on Phase 2 Results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Alstone, Peter; Potter, Jennifer; Piette, Mary Ann

    California’s legislative and regulatory goals for renewable energy are changing the power grid’s dynamics. Increased variable generation resource penetration connected to the bulk power system, as well as, distributed energy resources (DERs) connected to the distribution system affect the grid’s reliable operation over many different time scales (e.g., days to hours to minutes to seconds). As the state continues this transition, it will require careful planning to ensure resources with the right characteristics are available to meet changing grid management needs. Demand response (DR) has the potential to provide important resources for keeping the electricity grid stable and efficient, tomore » defer upgrades to generation, transmission and distribution systems, and to deliver customer economic benefits. This study estimates the potential size and cost of future DR resources for California’s three investor-owned utilities (IOUs): Pacific Gas and Electric Company (PG&E), Southern California Edison Company (SCE), and San Diego Gas & Electric Company (SDG&E). Our goal is to provide data-driven insights as the California Public Utilities Commission (CPUC) evaluates how to enhance DR’s role in meeting California’s resource planning needs and operational requirements. We address two fundamental questions: 1. What cost-competitive DR service types will meet California’s future grid needs as it moves towards clean energy and advanced infrastructure? 2. What is the size and cost of the expected resource base for the DR service types?« less

  11. Optimizing the U.S. Electric System with a High Penetration of Renewables

    NASA Astrophysics Data System (ADS)

    Corcoran, B. A.; Jacobson, M. Z.

    2012-12-01

    As renewable energy generators are increasingly being installed throughout the U.S., there is growing interest in interconnecting diverse renewable generators (primarily wind and solar) across large geographic areas through an enhanced transmission system. This reduces variability in the aggregate power output, increases system reliability, and allows for the development of the best overall group of renewable technologies and sites to meet the load. Studies are therefore needed to determine the most efficient and economical plan to achieve large area interconnections in a future electric system with a high penetration of renewables. This research quantifies the effects of aggregating electric load and, separately, electric load together with diverse renewable generation throughout the ten Federal Energy Regulatory Commission (FERC) regions in the contiguous U.S. The effects of aggregating electric load alone -- including generator capacity capital cost savings, load energy shift operating cost savings, reserve requirement cost savings, and transmission costs -- were calculated for various groupings of FERC regions using 2006 data. Transmission costs outweighed cost savings due to aggregation in nearly all cases. East-west transmission layouts had the highest overall cost, and interconnecting ERCOT to adjacent FERC regions resulted in increased costs, both due to limited existing transmission capacity. Scenarios consisting of smaller aggregation groupings had the lowest overall cost. This analysis found no economic case for further aggregation of load alone within the U.S., except possibly in the West and Northwest. If aggregation of electric load is desired, then small, regional consolidations yield the lowest overall system cost. Next, the effects of aggregating electric load together with renewable electricity generation are being quantified through the development and use of an optimization tool in AMPL (A Mathematical Programming Language). This deterministic linear program solves for the least-cost organizational structure and system (generator, transmission, storage, and reserve requirements) for a highly renewable U.S. electric grid. The analysis will 1) examine a highly renewable 2006 electric system, and 2) create a "roadmap" from the existing 2006 system to a highly renewable system in 2030, accounting for projected price and demand changes and generator retirements based on age and environmental regulations. Ideally, results from this study will offer insight for a federal renewable energy policy (such as a renewable portfolio standard) and how to best organize regions for transmission planning.

  12. 18 CFR 141.51 - FERC Form No. 714, Annual Electric Balancing Authority Area and Planning Area Report.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ..., Annual Electric Balancing Authority Area and Planning Area Report. 141.51 Section 141.51 Conservation of...) § 141.51 FERC Form No. 714, Annual Electric Balancing Authority Area and Planning Area Report. (a) Who... Policies Act, 16 U.S.C. 2602, operating a balancing authority area, and any group of electric utilities...

  13. 18 CFR 141.51 - FERC Form No. 714, Annual Electric Balancing Authority Area and Planning Area Report.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ..., Annual Electric Balancing Authority Area and Planning Area Report. 141.51 Section 141.51 Conservation of...) § 141.51 FERC Form No. 714, Annual Electric Balancing Authority Area and Planning Area Report. (a) Who... Policies Act, 16 U.S.C. 2602, operating a balancing authority area, and any group of electric utilities...

  14. 18 CFR 141.51 - FERC Form No. 714, Annual Electric Balancing Authority Area and Planning Area Report.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ..., Annual Electric Balancing Authority Area and Planning Area Report. 141.51 Section 141.51 Conservation of...) § 141.51 FERC Form No. 714, Annual Electric Balancing Authority Area and Planning Area Report. (a) Who... Policies Act, 16 U.S.C. 2602, operating a balancing authority area, and any group of electric utilities...

  15. 18 CFR 141.51 - FERC Form No. 714, Annual Electric Balancing Authority Area and Planning Area Report.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., Annual Electric Balancing Authority Area and Planning Area Report. 141.51 Section 141.51 Conservation of...) § 141.51 FERC Form No. 714, Annual Electric Balancing Authority Area and Planning Area Report. (a) Who... Policies Act, 16 U.S.C. 2602, operating a balancing authority area, and any group of electric utilities...

  16. 18 CFR 141.51 - FERC Form No. 714, Annual Electric Balancing Authority Area and Planning Area Report.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ..., Annual Electric Balancing Authority Area and Planning Area Report. 141.51 Section 141.51 Conservation of...) § 141.51 FERC Form No. 714, Annual Electric Balancing Authority Area and Planning Area Report. (a) Who... Policies Act, 16 U.S.C. 2602, operating a balancing authority area, and any group of electric utilities...

  17. Nuclear electric propulsion operational reliability and crew safety study: NEP systems/modeling report

    NASA Technical Reports Server (NTRS)

    Karns, James

    1993-01-01

    The objective of this study was to establish the initial quantitative reliability bounds for nuclear electric propulsion systems in a manned Mars mission required to ensure crew safety and mission success. Finding the reliability bounds involves balancing top-down (mission driven) requirements and bottom-up (technology driven) capabilities. In seeking this balance we hope to accomplish the following: (1) provide design insights into the achievability of the baseline design in terms of reliability requirements, given the existing technology base; (2) suggest alternative design approaches which might enhance reliability and crew safety; and (3) indicate what technology areas require significant research and development to achieve the reliability objectives.

  18. 75 FR 5779 - Proposed Emergency Agency Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-04

    ... proposed collection of information, including the validity of the methodology and assumptions used; (c... Collection Request Title: Electricity Delivery and Energy Reliability Recovery Act Smart Grid Grant Program..., Chief Operating Officer, Electricity Delivery and Energy Reliability. [FR Doc. 2010-2422 Filed 2-3-10; 8...

  19. Analysis of the 60-Hz power system at KSC: The Orsino substation

    NASA Technical Reports Server (NTRS)

    Kalu, Alex O.

    1989-01-01

    An analysis of the Orsino Substation, a component (50 percent) of the 60-Hertz electric power system at the Kennedy Space Center, is presented. Presented here are separate single-line diagrams of the sixteen feeder circuits to permit easy access to information on the individual feeders for future planning. The load condition of each feeder and load break switch are presented and a heuristic reliability analysis of the system is performed. Information is given about the system fashion useful for decision making purposes. The beauty of it is in the simplified manner by which information about the system can be obtained.

  20. NUCLA Circulating Atmospheric Fluidized Bed Demonstration Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Keith, Raymond E.; Heller, Thomas J.; Bush, Stuart A.

    1991-01-01

    This Annual Report on Colorado-Ute Electric Association's NUCLA Circulating Fluidized Bed (CFB) Demonstration Program covers the period from February 1987 through December 1988. The outline for presentation in this report includes a summary of unit operations along with individual sections covering progress in study plan areas that commenced during this reporting period. These include cold-mode shakedown and calibration, plant commercial performance statistics, unit start-up (cold), coal and limestone preparation and handling, ash handling system performance and operating experience, tubular air heater, baghouse operation and performance, materials monitoring, and reliability monitoring. During this reporting period, the coal-mode shakedown and calibration planmore » was completed. (VC)« less

  1. Integrating Variable Renewable Energy - Russia

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    To foster sustainable, low-emission development, many countries are establishing ambitious renewable energy targets for their electricity supply. Because solar and wind tend to be more variable and uncertain than conventional sources, meeting these targets will involve changes to power system planning and operations. Grid integration is the practice of developing efficient ways to deliver variable renewable energy (VRE) to the grid. Good integration methods maximize the cost-effectiveness of incorporating VRE into the power system while maintaining or increasing system stability and reliability. When considering grid integration, policy makers, regulators, and system operators consider a variety of issues, which can bemore » organized into four broad topics: New Renewable Energy Generation, New Transmission, Increased System Flexibility, Planning for a High RE Future. This is a Russian-language translation of Integrating Variable Renewable Energy into the Grid: Key Issues, Greening the Grid, originally published in English in May 2015.« less

  2. Hiilangaay Hydroelectric Project – Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Twitchell, Sara; Stimac, Michael; Lang, Lisa

    2016-06-01

    The Hiilangaay Hydroelectric Project (“Hiilangaay” or the “Project”) is a 5-megawatt hydroelectric resource currently under construction on Prince of Wales Island (POW), Alaska, approximately ten miles east of Hydaburg. The objective of the Project is to interconnect with the existing transmission grid on Prince of Wales Island, increasing the hydroelectric generation capability by 5 MW, eliminating the need for diesel generation, increasing the reliability of the electrical system, and allowing the interconnected portion of the island to have 100 percent renewable energy generation. Pre-construction activities including construction planning, permit coordination and compliance, and final design have made it possible tomore » move forward with construction of the Hiilangaay Project. Despite repeated delays to the schedule, persistence and long-term planning will culminate in the construction of the Project, and make Prince of Wales Island independent of diesel-fueled energy« less

  3. Resilient off-grid microgrids: Capacity planning and N-1 security

    DOE PAGES

    Madathil, Sreenath Chalil; Yamangil, Emre; Nagarajan, Harsha; ...

    2017-06-13

    Over the past century the electric power industry has evolved to support the delivery of power over long distances with highly interconnected transmission systems. Despite this evolution, some remote communities are not connected to these systems. These communities rely on small, disconnected distribution systems, i.e., microgrids to deliver power. However, as microgrids often are not held to the same reliability standards as transmission grids, remote communities can be at risk for extended blackouts. To address this issue, we develop an optimization model and an algorithm for capacity planning and operations of microgrids that include N-1 security and other practical modelingmore » features like AC power flow physics, component efficiencies and thermal limits. Lastly, we demonstrate the computational effectiveness of our approach on two test systems; a modified version of the IEEE 13 node test feeder and a model of a distribution system in a remote community in Alaska.« less

  4. Integrating Variable Renewable Energy into the Grid: Key Issues, Greening the Grid (Spanish Version)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    This is the Spanish version of 'Greening the Grid - Integrating Variable Renewable Energy into the Grid: Key Issues'. To foster sustainable, low-emission development, many countries are establishing ambitious renewable energy targets for their electricity supply. Because solar and wind tend to be more variable and uncertain than conventional sources, meeting these targets will involve changes to power system planning and operations. Grid integration is the practice of developing efficient ways to deliver variable renewable energy (VRE) to the grid. Good integration methods maximize the cost-effectiveness of incorporating VRE into the power system while maintaining or increasing system stability andmore » reliability. When considering grid integration, policy makers, regulators, and system operators consider a variety of issues, which can be organized into four broad topics: New Renewable Energy Generation, New Transmission, Increased System Flexibility, and Planning for a High RE Future.« less

  5. Resilient off-grid microgrids: Capacity planning and N-1 security

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Madathil, Sreenath Chalil; Yamangil, Emre; Nagarajan, Harsha

    Over the past century the electric power industry has evolved to support the delivery of power over long distances with highly interconnected transmission systems. Despite this evolution, some remote communities are not connected to these systems. These communities rely on small, disconnected distribution systems, i.e., microgrids to deliver power. However, as microgrids often are not held to the same reliability standards as transmission grids, remote communities can be at risk for extended blackouts. To address this issue, we develop an optimization model and an algorithm for capacity planning and operations of microgrids that include N-1 security and other practical modelingmore » features like AC power flow physics, component efficiencies and thermal limits. Lastly, we demonstrate the computational effectiveness of our approach on two test systems; a modified version of the IEEE 13 node test feeder and a model of a distribution system in a remote community in Alaska.« less

  6. A reliability design method for a lithium-ion battery pack considering the thermal disequilibrium in electric vehicles

    NASA Astrophysics Data System (ADS)

    Xia, Quan; Wang, Zili; Ren, Yi; Sun, Bo; Yang, Dezhen; Feng, Qiang

    2018-05-01

    With the rapid development of lithium-ion battery technology in the electric vehicle (EV) industry, the lifetime of the battery cell increases substantially; however, the reliability of the battery pack is still inadequate. Because of the complexity of the battery pack, a reliability design method for a lithium-ion battery pack considering the thermal disequilibrium is proposed in this paper based on cell redundancy. Based on this method, a three-dimensional electric-thermal-flow-coupled model, a stochastic degradation model of cells under field dynamic conditions and a multi-state system reliability model of a battery pack are established. The relationships between the multi-physics coupling model, the degradation model and the system reliability model are first constructed to analyze the reliability of the battery pack and followed by analysis examples with different redundancy strategies. By comparing the reliability of battery packs of different redundant cell numbers and configurations, several conclusions for the redundancy strategy are obtained. More notably, the reliability does not monotonically increase with the number of redundant cells for the thermal disequilibrium effects. In this work, the reliability of a 6 × 5 parallel-series configuration is the optimal system structure. In addition, the effect of the cell arrangement and cooling conditions are investigated.

  7. Distribution System Reliability Analysis for Smart Grid Applications

    NASA Astrophysics Data System (ADS)

    Aljohani, Tawfiq Masad

    Reliability of power systems is a key aspect in modern power system planning, design, and operation. The ascendance of the smart grid concept has provided high hopes of developing an intelligent network that is capable of being a self-healing grid, offering the ability to overcome the interruption problems that face the utility and cost it tens of millions in repair and loss. To address its reliability concerns, the power utilities and interested parties have spent extensive amount of time and effort to analyze and study the reliability of the generation and transmission sectors of the power grid. Only recently has attention shifted to be focused on improving the reliability of the distribution network, the connection joint between the power providers and the consumers where most of the electricity problems occur. In this work, we will examine the effect of the smart grid applications in improving the reliability of the power distribution networks. The test system used in conducting this thesis is the IEEE 34 node test feeder, released in 2003 by the Distribution System Analysis Subcommittee of the IEEE Power Engineering Society. The objective is to analyze the feeder for the optimal placement of the automatic switching devices and quantify their proper installation based on the performance of the distribution system. The measures will be the changes in the reliability system indices including SAIDI, SAIFI, and EUE. The goal is to design and simulate the effect of the installation of the Distributed Generators (DGs) on the utility's distribution system and measure the potential improvement of its reliability. The software used in this work is DISREL, which is intelligent power distribution software that is developed by General Reliability Co.

  8. 75 FR 71613 - Mandatory Reliability Standards for Interconnection Reliability Operating Limits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-24

    ... Reliability Standards. The proposed Reliability Standards were designed to prevent instability, uncontrolled... Reliability Standards.\\2\\ The proposed Reliability Standards were designed to prevent instability... the SOLs, which if exceeded, could expose a widespread area of the bulk electric system to instability...

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gottesfeld, S.

    The fuel cell is the most efficient device for the conversion of hydrogen fuel to electric power. As such, the fuel cell represents a key element in efforts to demonstrate and implement hydrogen fuel utilization for electric power generation. The low temperature, polymer electrolyte membrane fuel cell (PEMFC) has recently been identified as an attractive option for stationary power generation, based on the relatively simple and benign materials employed, the zero-emission character of the device, and the expected high power density, high reliability and low cost. However, a PEMFC stack fueled by hydrogen with the combined properties of low cost,more » high performance and high reliability has not yet been demonstrated. Demonstration of such a stack will remove a significant barrier to implementation of this advanced technology for electric power generation from hydrogen. Work done in the past at LANL on the development of components and materials, particularly on advanced membrane/electrode assemblies (MEAs), has contributed significantly to the capability to demonstrate in the foreseeable future a PEMFC stack with the combined characteristics described above. A joint effort between LANL and an industrial stack manufacturer will result in the demonstration of such a fuel cell stack for stationary power generation. The stack could operate on hydrogen fuel derived from either natural gas or from renewable sources. The technical plan includes collaboration with a stack manufacturer (CRADA). It stresses the special requirements from a PEMFC in stationary power generation, particularly maximization of the energy conversion efficiency, extension of useful life to the 10 hours time scale and tolerance to impurities from the reforming of natural gas.« less

  10. 77 FR 47051 - Notice of Commissioner and Staff Attendance at North American Electric Reliability Corporation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-07

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commissioner and Staff Attendance at North American Electric Reliability Corporation Meetings The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission and/or Commission staff may attend...

  11. 76 FR 66924 - Notice of Commissioner and Staff Attendance at North American Electric Reliability Corporation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-28

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commissioner and Staff Attendance at North American Electric Reliability Corporation Meetings The Federal Energy Regulatory Commission hereby gives notice that members of the Commission and/or Commission staff may attend the...

  12. 77 FR 24946 - Notice of Commissioner and Staff Attendance at North American Electric Reliability Corporation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-26

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commissioner and Staff Attendance at North American Electric Reliability Corporation Meetings The Federal Energy Regulatory Commission hereby gives notice that members of the Commission and/or Commission staff may attend the...

  13. 76 FR 28024 - Notice of Commissioner and Staff Attendance at North American Electric Reliability Corporation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commissioner and Staff Attendance at North American Electric Reliability Corporation Meetings The Federal Energy Regulatory Commission hereby gives notice that members of the Commission and/or Commission staff may attend the...

  14. 77 FR 6112 - Notice of Commissioner and Staff Attendance at North American Electric Reliability Corporation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-07

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commissioner and Staff Attendance at North American Electric Reliability Corporation Meetings The Federal Energy Regulatory Commission hereby gives notice that members of the Commission and/or Commission staff may attend the...

  15. Final Report to the National Energy Technology Laboratory on FY14- FY15 Cooperative Research with the Consortium for Electric Reliability Technology Solutions

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vittal, Vijay; Lampis, Anna Rosa

    The Power System Engineering Research Center (PSERC) engages in technological, market, and policy research for an efficient, secure, resilient, adaptable, and economic U.S. electric power system. PSERC, as a founding partner of the Consortium for Electric Reliability Technology Solutions (CERTS), conducted a multi-year program of research for U.S. Department of Energy (DOE) Office of Electricity Delivery and Energy Reliability (OE) to develop new methods, tools, and technologies to protect and enhance the reliability and efficiency of the U.S. electric power system as competitive electricity market structures evolve, and as the grid moves toward wide-scale use of decentralized generation (such asmore » renewable energy sources) and demand-response programs. Phase I of OE’s funding for PSERC, under cooperative agreement DE-FC26-09NT43321, started in fiscal year (FY) 2009 and ended in FY2013. It was administered by DOE’s National Energy Technology Laboratory (NETL) through a cooperative agreement with Arizona State University (ASU). ASU provided sub-awards to the participating PSERC universities. This document is PSERC’s final report to NETL on the activities for OE, conducted through CERTS, from September 2015 through September 2017 utilizing FY 2014 to FY 2015 funding under cooperative agreement DE-OE0000670. PSERC is a thirteen-university consortium with over 30 industry members. Since 1996, PSERC has been engaged in research and education efforts with the mission of “empowering minds to engineer the future electric energy system.” Its work is focused on achieving: • An efficient, secure, resilient, adaptable, and economic electric power infrastructure serving society • A new generation of educated technical professionals in electric power • Knowledgeable decision-makers on critical energy policy issues • Sustained, quality university programs in electric power engineering. PSERC core research is funded by industry, with a budget supporting approximately 30 principal investigators and some 70 graduate students and other researchers. Its researchers are multi-disciplinary, conducting research in three principal areas: power systems, power markets and policy, and transmission and distribution technologies. The research is collaborative; each project involves researchers typically at two universities working with industry advisors who have expressed interest in the project. Examples of topics for recent PSERC research projects include grid integration of renewables and energy storage, new tools for taking advantage of increased penetration of real-time system measurements, advanced system protection methods to maintain grid reliability, and risk and reliability assessment of increasingly complex cyber-enabled power systems. A PSERC’s objective is to proactively address the technical and policy challenges of U.S. electric power systems. To achieve this objective, PSERC works with CERTS to conduct technical research on advanced applications and investigate the design of fair and transparent electricity markets; these research topics align with CERTS research areas 1 and 2: Real-time Grid Reliability Management (Area 1), and Reliability and Markets (Area 2). The CERTS research areas overlap with the PSERC research stems: Power Systems, Power Markets, and Transmission and Distribution Technologies, as described on the PSERC website (see http://www.pserc.org/research/research_program.aspx). The performers were with Arizona State University (ASU), Cornell University (CU), University of California at Berkeley (UCB), and University of Illinois at Urbana-Champaign (UIUC). PSERC research activities in the area of reliability and markets focused on electric market and power policy analyses. The resulting studies suggest ways to frame best practices using organized markets for managing U.S. grid assets reliably and to identify highest priority areas for improvement. PSERC research activities in the area of advanced applications focused on mid- to long-term software research and development, with anticipated outcomes that move innovative ideas toward real-world application. Under the CERTS research area of Real-time Grid Reliability Management, PSERC has been focused on Advanced Applications Research and Development (AARD), a subgroup of activities that works to develop advanced applications and tools to more effectively operate the electricity delivery system, by enabling advanced analysis, visualization, monitoring and alarming, and decision support capabilities for grid operators.« less

  16. Web-based tool for visualization of electric field distribution in deep-seated body structures and planning of electroporation-based treatments.

    PubMed

    Marčan, Marija; Pavliha, Denis; Kos, Bor; Forjanič, Tadeja; Miklavčič, Damijan

    2015-01-01

    Treatments based on electroporation are a new and promising approach to treating tumors, especially non-resectable ones. The success of the treatment is, however, heavily dependent on coverage of the entire tumor volume with a sufficiently high electric field. Ensuring complete coverage in the case of deep-seated tumors is not trivial and can in best way be ensured by patient-specific treatment planning. The basis of the treatment planning process consists of two complex tasks: medical image segmentation, and numerical modeling and optimization. In addition to previously developed segmentation algorithms for several tissues (human liver, hepatic vessels, bone tissue and canine brain) and the algorithms for numerical modeling and optimization of treatment parameters, we developed a web-based tool to facilitate the translation of the algorithms and their application in the clinic. The developed web-based tool automatically builds a 3D model of the target tissue from the medical images uploaded by the user and then uses this 3D model to optimize treatment parameters. The tool enables the user to validate the results of the automatic segmentation and make corrections if necessary before delivering the final treatment plan. Evaluation of the tool was performed by five independent experts from four different institutions. During the evaluation, we gathered data concerning user experience and measured performance times for different components of the tool. Both user reports and performance times show significant reduction in treatment-planning complexity and time-consumption from 1-2 days to a few hours. The presented web-based tool is intended to facilitate the treatment planning process and reduce the time needed for it. It is crucial for facilitating expansion of electroporation-based treatments in the clinic and ensuring reliable treatment for the patients. The additional value of the tool is the possibility of easy upgrade and integration of modules with new functionalities as they are developed.

  17. Web-based tool for visualization of electric field distribution in deep-seated body structures and planning of electroporation-based treatments

    PubMed Central

    2015-01-01

    Background Treatments based on electroporation are a new and promising approach to treating tumors, especially non-resectable ones. The success of the treatment is, however, heavily dependent on coverage of the entire tumor volume with a sufficiently high electric field. Ensuring complete coverage in the case of deep-seated tumors is not trivial and can in best way be ensured by patient-specific treatment planning. The basis of the treatment planning process consists of two complex tasks: medical image segmentation, and numerical modeling and optimization. Methods In addition to previously developed segmentation algorithms for several tissues (human liver, hepatic vessels, bone tissue and canine brain) and the algorithms for numerical modeling and optimization of treatment parameters, we developed a web-based tool to facilitate the translation of the algorithms and their application in the clinic. The developed web-based tool automatically builds a 3D model of the target tissue from the medical images uploaded by the user and then uses this 3D model to optimize treatment parameters. The tool enables the user to validate the results of the automatic segmentation and make corrections if necessary before delivering the final treatment plan. Results Evaluation of the tool was performed by five independent experts from four different institutions. During the evaluation, we gathered data concerning user experience and measured performance times for different components of the tool. Both user reports and performance times show significant reduction in treatment-planning complexity and time-consumption from 1-2 days to a few hours. Conclusions The presented web-based tool is intended to facilitate the treatment planning process and reduce the time needed for it. It is crucial for facilitating expansion of electroporation-based treatments in the clinic and ensuring reliable treatment for the patients. The additional value of the tool is the possibility of easy upgrade and integration of modules with new functionalities as they are developed. PMID:26356007

  18. 77 FR 29995 - Electricity Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-21

    ... DEPARTMENT OF ENERGY Electricity Advisory Committee AGENCY: Office of Electricity Delivery and... a meeting of the Electricity Advisory Committee (EAC). The Federal Advisory Committee Act (Pub. L... INFORMATION CONTACT: Matthew Rosenbaum, Office of Electricity Delivery and Energy Reliability, U.S. Department...

  19. 77 FR 58534 - Electricity Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-21

    ... DEPARTMENT OF ENERGY Electricity Advisory Committee AGENCY: Office of Electricity Delivery and... a meeting of the Electricity Advisory Committee (EAC). The Federal Advisory Committee Act (Pub. L... FURTHER INFORMATION CONTACT: Matthew Rosenbaum, Office of Electricity Delivery and Energy Reliability, U.S...

  20. 76 FR 10577 - Electricity Advisory Committee Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-25

    ... DEPARTMENT OF ENERGY Electricity Advisory Committee Meeting AGENCY: Office of Electricity Delivery... announces a meeting of the reestablished Electricity Advisory Committee (EAC). The Federal Advisory... CONTACT: David Meyer, Office of Electricity Delivery and Energy Reliability, U.S. Department of Energy...

  1. 76 FR 60820 - North American Electric Reliability Corporation; Notice of Technical Conference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-30

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RD10-8-000] North American Electric Reliability Corporation; Notice of Technical Conference Take notice that the Federal Energy... Conference will explore the risks of leaving dial-up intelligent electronic devices that are part of the Bulk...

  2. 18 CFR 39.8 - Delegation to a Regional Entity.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Regional Entity. 39.8 Section 39.8 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... OF ELECTRIC RELIABILITY STANDARDS § 39.8 Delegation to a Regional Entity. (a) The Electric Reliability Organization may enter into an agreement to delegate authority to a Regional Entity for the...

  3. 18 CFR 375.311 - Delegations to the Director of the Office of Enforcement.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Federal Power Act for the purpose of directing the Electric Reliability Organization or the applicable... the Commission for consideration. (u) Direct the Electric Reliability Organization or the applicable... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Delegations to the...

  4. 75 FR 44235 - Notice of Commissioner and Staff Attendance at North American Electric Reliability Corporation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-28

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commissioner and Staff Attendance at North American Electric Reliability Corporation Meetings July 21, 2010. The Federal Energy Regulatory Commission hereby gives notice that members of the Commission and/or Commission staff may attend...

  5. 76 FR 7839 - Notice of Commission Staff Attendance at North American Electric Reliability Corporation (NERC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commission Staff Attendance at North American Electric Reliability Corporation (NERC) Meetings from January-June 2011 The Federal Energy Regulatory Commission hereby gives notice that members of the Commission and Commission staff may...

  6. Inspection planning development: An evolutionary approach using reliability engineering as a tool

    NASA Technical Reports Server (NTRS)

    Graf, David A.; Huang, Zhaofeng

    1994-01-01

    This paper proposes an evolutionary approach for inspection planning which introduces various reliability engineering tools into the process and assess system trade-offs among reliability, engineering requirement, manufacturing capability and inspection cost to establish an optimal inspection plan. The examples presented in the paper illustrate some advantages and benefits of the new approach. Through the analysis, reliability and engineering impacts due to manufacturing process capability and inspection uncertainty are clearly understood; the most cost effective and efficient inspection plan can be established and associated risks are well controlled; some inspection reductions and relaxations are well justified; and design feedbacks and changes may be initiated from the analysis conclusion to further enhance reliability and reduce cost. The approach is particularly promising as global competitions and customer quality improvement expectations are rapidly increasing.

  7. 2014 Summer Series - Mark Jacobson - Roadmaps for Transitioning All 50 US States to Wind, Water and Solar Power

    NASA Image and Video Library

    2014-07-08

    Global warming, air pollution, and energy insecurity are three of the most significant problems facing the world today. This talk discusses the development of technical and economic plans to convert the energy infrastructure of each of the 50 United States to those powered by 100% wind, water, and sunlight (WWS) for all purposes, namely electricity, transportation, industry, and heating/cooling, after energy efficiency measures have been accounted for. The plans call for all new energy to be WWS by 2020, ~80% conversion of existing energy by 2030, and 100% by 2050 through aggressive policy measures and natural transition. Resource availability, footprint and spacing areas required, jobs created, energy costs, avoided costs from air pollution mortality and morbidity and climate damage, methods of ensuring reliability of the grid, and impacts of offshore wind farms on hurricane dissipation are discussed. Air pollution reductions alone due to the plan would eliminate ~60,000 U.S. premature mortalities, avoiding costs equivalent to 3.2% of the United States GDP. Climate cost reductions are of similar order. The plans stabilize energy prices because fuel costs are zero.

  8. Nuclear electric propulsion: A better, safer, cheaper transportation system for human exploration of Mars

    NASA Technical Reports Server (NTRS)

    Clark, John S.; George, Jeffrey A.; Gefert, Leon P.; Doherty, Michael P.; Sefcik, Robert J.

    1994-01-01

    NASA has completed a preliminary mission and systems study of nuclear electric propulsion (NEP) systems for 'split-sprint' human exploration and related robotic cargo missions to Mars. This paper describes the study, the mission architecture selected, the NEP system and technology development needs, proposed development schedules, and estimated development costs. Since current administration policy makers have delayed funding for key technology development activities that could make Mars exploration missions a reality in the near future, NASA will have time to evaluate various alternate mission options, and it appears prudent to ensure that Mars mission plans focus on astronaut and mission safety, while reducing costs to acceptable levels. The split-sprint nuclear electric propulsion system offers trip times comparable to nuclear thermal propulsion (NTP) systems, while providing mission abort opportunities that are not possible with 'reference' mission architectures. Thus, NEP systems offer short transit times for the astronauts, reducing the exposure of the crew to intergalactic cosmic radiation. The high specific impulse of the NEP system, which leads to very low propellant requirements, results in significantly lower 'initial mass in low earth orbit' (IMLEO). Launch vehicle packaging studies show that the NEP system can be launched, assembled, and deployed, with about one less 240-metric-ton heavy lift launch vehicle (HLLV) per mission opportunity - a very Technology development cost of the nuclear reactor for an NEP system would be shared with the proposed nuclear surface power systems, since nuclear systems will be required to provide substantial electrical power on the surface of Mars. The NEP development project plan proposed includes evolutionary technology development for nuclear electric propulsion systems that expands upon SP-100 (Space Power - 100 kw(e)) technology that has been developed for lunar and Mars surface nuclear power, and small NEP systems for interplanetary probes. System upgrades are expected to evolve that will result in even shorter trip times, improved payload capabilities, and enhanced safety and reliability.

  9. 76 FR 37103 - Electricity Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-24

    ... DEPARTMENT OF ENERGY Electricity Advisory Committee AGENCY: Office of Electricity Delivery and... a meeting of the Electricity Advisory Committee (EAC). The Federal Advisory Committee Act (Pub. L...: David Meyer, Office of Electricity Delivery and Energy Reliability, U.S. Department of Energy, Forrestal...

  10. Blow molding electric drives of Mechanical Engineering

    NASA Astrophysics Data System (ADS)

    Bukhanov, S. S.; Ramazanov, M. A.; Tsirkunenko, A. T.

    2018-03-01

    The article considers the questions about the analysis of new possibilities, which gives the use of adjustable electric drives for blowing mechanisms of plastic production. Thus, the use of new semiconductor converters makes it possible not only to compensate the instability of the supply network by using special dynamic voltage regulators, but to improve (correct) the power factor. The calculation of economic efficiency in controlled electric drives of blowing mechanisms is given. On the basis of statistical analysis, the calculation of the reliability parameters of the regulated electric drives’ elements under consideration is given. It is shown that an increase in the reliability of adjustable electric drives is possible both due to overestimation of the electric drive’s installed power, and in simpler schemes with pulse-vector control.

  11. 10 CFR Appendix D to Subpart D of... - Classes of Actions that Normally Require EISs

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...] D7Contracts, policies, and marketing and allocation plans for electric power D8Import or export of natural gas... and Allocation Plans for Electric Power Establishment and implementation of contracts, policies, and marketing and allocation plans related to electric power acquisition that involve (1) The interconnection of...

  12. 10 CFR Appendix D to Subpart D of... - Classes of Actions that Normally Require EISs

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...] D7Contracts, policies, and marketing and allocation plans for electric power D8Import or export of natural gas... and Allocation Plans for Electric Power Establishment and implementation of contracts, policies, and marketing and allocation plans related to electric power acquisition that involve (1) The interconnection of...

  13. 78 FR 12042 - Electric Grid Integration Technical Workshops

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-21

    .... The documents are the Electricity Distribution System Workshop Discussion Summary and the Electricity... FURTHER INFORMATION CONTACT: Caitlin A. Callaghan, National Electricity Delivery Division, Office of Electricity Delivery and Energy Reliability, U.S. Department of Energy, Forrestal Building, Room 8E-032, 1000...

  14. 78 FR 55692 - Electricity Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-11

    ... DEPARTMENT OF ENERGY Electricity Advisory Committee AGENCY: Office of Electricity Delivery and... a meeting of the Electricity Advisory Committee (EAC). The Federal Advisory Committee Act (Pub. L... Electricity Delivery and Energy Reliability, U.S. Department of Energy, Forrestal Building, Room 8G-017, 1000...

  15. Tacit Knowledge Capture and the Brain-Drain at Electrical Utilities

    NASA Astrophysics Data System (ADS)

    Perjanik, Nicholas Steven

    As a consequence of an aging workforce, electric utilities are at risk of losing their most experienced and knowledgeable electrical engineers. In this research, the problem was a lack of understanding of what electric utilities were doing to capture the tacit knowledge or know-how of these engineers. The purpose of this qualitative research study was to explore the tacit knowledge capture strategies currently used in the industry by conducting a case study of 7 U.S. electrical utilities that have demonstrated an industry commitment to improving operational standards. The research question addressed the implemented strategies to capture the tacit knowledge of retiring electrical engineers and technical personnel. The research methodology involved a qualitative embedded case study. The theories used in this study included knowledge creation theory, resource-based theory, and organizational learning theory. Data were collected through one time interviews of a senior electrical engineer or technician within each utility and a workforce planning or training professional within 2 of the 7 utilities. The analysis included the use of triangulation and content analysis strategies. Ten tacit knowledge capture strategies were identified: (a) formal and informal on-boarding mentorship and apprenticeship programs, (b) formal and informal off-boarding mentorship programs, (c) formal and informal training programs, (d) using lessons learned during training sessions, (e) communities of practice, (f) technology enabled tools, (g) storytelling, (h) exit interviews, (i) rehiring of retirees as consultants, and (j) knowledge risk assessments. This research contributes to social change by offering strategies to capture the know-how needed to ensure operational continuity in the delivery of safe, reliable, and sustainable power.

  16. 77 FR 34379 - North American Electric Reliability Corporation; Notice of Designation of Commission Staff as Non...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-11

    ... Electric Reliability Corporation; Notice of Designation of Commission Staff as Non-Decisional With respect... below, the staff of the Office of Enforcement are designated as non-decisional in deliberations by the... non-decisional staff, pursuant to 18 CFR 385.2201 (2011), they are prohibited from communicating with...

  17. 76 FR 39922 - Office of New Reactors; Proposed Revision 4 to Standard Review Plan Section 8.1 on Electric Power...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-07

    ... the proposed Revision 4 to Standard Review Plan Section 8.1 on ``Electric Power-- Introduction.'' The... NUCLEAR REGULATORY COMMISSION [NRC-2011-0119] Office of New Reactors; Proposed Revision 4 to Standard Review Plan Section 8.1 on Electric Power--Introduction, Correction AGENCY: Nuclear Regulatory...

  18. Added Value of Reliability to a Microgrid: Simulations of Three California Buildings

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Marnay, Chris; Lai, Judy; Stadler, Michael

    The Distributed Energy Resources Customer Adoption Model is used to estimate the value an Oakland nursing home, a Riverside high school, and a Sunnyvale data center would need to put on higher electricity service reliability for them to adopt a Consortium for Electric Reliability Technology Solutions Microgrid (CM) based on economics alone. A fraction of each building's load is deemed critical based on its mission, and the added cost of CM capability to meet it added to on-site generation options. The three sites are analyzed with various resources available as microgrid components. Results show that the value placed on highermore » reliability often does not have to be significant for CM to appear attractive, about 25 $/kWcdota and up, but the carbon footprint consequences are mixed because storage is often used to shift cheaper off-peak electricity to use during afternoon hours in competition with the solar sources.« less

  19. Wholesale electricity market design with increasing levels of renewable generation: Revenue sufficiency and long-term reliability

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Milligan, Michael; Frew, Bethany A.; Bloom, Aaron

    This paper discusses challenges that relate to assessing and properly incentivizing the resources necessary to ensure a reliable electricity system with growing penetrations of variable generation (VG). The output of VG (primarily wind and solar generation) varies over time and cannot be predicted precisely. Therefore, the energy from VG is not always guaranteed to be available at times when it is most needed. This means that its contribution towards resource adequacy can be significantly less than the contribution from traditional resources. Variable renewable resources also have near-zero variable costs, and with production-based subsidies they may even have negative offer costs.more » Because variable costs drive the spot price of energy, this can lead to reduced prices, sales, and therefore revenue for all resources within the energy market. The characteristics of VG can also result in increased price volatility as well as the need for more flexibility in the resource fleet in order to maintain system reliability. We explore both traditional and evolving electricity market designs in the United States that aim to ensure resource adequacy and sufficient revenues to recover costs when those resources are needed for longterm reliability. We also investigate how reliability needs may be evolving and discuss how VG may affect future electricity market designs« less

  20. Choosing a reliability inspection plan for interval censored data

    DOE PAGES

    Lu, Lu; Anderson-Cook, Christine Michaela

    2017-04-19

    Reliability test plans are important for producing precise and accurate assessment of reliability characteristics. This paper explores different strategies for choosing between possible inspection plans for interval censored data given a fixed testing timeframe and budget. A new general cost structure is proposed for guiding precise quantification of total cost in inspection test plan. Multiple summaries of reliability are considered and compared as the criteria for choosing the best plans using an easily adapted method. Different cost structures and representative true underlying reliability curves demonstrate how to assess different strategies given the logistical constraints and nature of the problem. Resultsmore » show several general patterns exist across a wide variety of scenarios. Given the fixed total cost, plans that inspect more units with less frequency based on equally spaced time points are favored due to the ease of implementation and consistent good performance across a large number of case study scenarios. Plans with inspection times chosen based on equally spaced probabilities offer improved reliability estimates for the shape of the distribution, mean lifetime, and failure time for a small fraction of population only for applications with high infant mortality rates. The paper uses a Monte Carlo simulation based approach in addition to the common evaluation based on the asymptotic variance and offers comparison and recommendation for different applications with different objectives. Additionally, the paper outlines a variety of different reliability metrics to use as criteria for optimization, presents a general method for evaluating different alternatives, as well as provides case study results for different common scenarios.« less

  1. Choosing a reliability inspection plan for interval censored data

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lu, Lu; Anderson-Cook, Christine Michaela

    Reliability test plans are important for producing precise and accurate assessment of reliability characteristics. This paper explores different strategies for choosing between possible inspection plans for interval censored data given a fixed testing timeframe and budget. A new general cost structure is proposed for guiding precise quantification of total cost in inspection test plan. Multiple summaries of reliability are considered and compared as the criteria for choosing the best plans using an easily adapted method. Different cost structures and representative true underlying reliability curves demonstrate how to assess different strategies given the logistical constraints and nature of the problem. Resultsmore » show several general patterns exist across a wide variety of scenarios. Given the fixed total cost, plans that inspect more units with less frequency based on equally spaced time points are favored due to the ease of implementation and consistent good performance across a large number of case study scenarios. Plans with inspection times chosen based on equally spaced probabilities offer improved reliability estimates for the shape of the distribution, mean lifetime, and failure time for a small fraction of population only for applications with high infant mortality rates. The paper uses a Monte Carlo simulation based approach in addition to the common evaluation based on the asymptotic variance and offers comparison and recommendation for different applications with different objectives. Additionally, the paper outlines a variety of different reliability metrics to use as criteria for optimization, presents a general method for evaluating different alternatives, as well as provides case study results for different common scenarios.« less

  2. A Historical and Engineering View of Power Transmission Systems in Kansai Electric Power Co., Inc.

    NASA Astrophysics Data System (ADS)

    Ito, Shunichi; Akiyama, Tetsuo

    During our work in operations related to power transmission technology, we have encountered various natural calamities and man-made disasters. Over the years, we learned many valuable lessons from these bitter experiences, and we now have more reliable, cost-effective and flexible electric power systems. This paper describes the new technologies we have introduced in the facilities making up the power systems and how we operate these systems and facilities. It also takes up the Southern Hyogo Earthquake and loss of Ohi nuclear power generation due to galloping phenomena as typical examples showing how a set of measures as mentioned above substantially improved the reliability of the electric power systems to such an extent that the Japanese electric power systems have attained the world's highest level of reliability. These facts prove that steady and continuous efforts are a prerequisite to success for all power engineers.

  3. 76 FR 41808 - Draft Environmental Impact Statement and Draft Habitat Conservation Plan for Oncor Electric...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-15

    ...] Draft Environmental Impact Statement and Draft Habitat Conservation Plan for Oncor Electric Delivery..., announce the availability of the draft environmental impact statement and the draft Oncor Electric Delivery... Oncor Electric Delivery Company, LLC (Applicant; Oncor), and (2) That the Applicant has developed a...

  4. 76 FR 71966 - Notice of Commissioner and Staff Attendance at ReliabilityFirst

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-21

    ... Attendance at ReliabilityFirst Corporation Meetings The Federal Energy Regulatory Commission hereby gives...: ReliabilityFirst Corporation, Annual Meeting of Members and Board of Directors Meetings, Grand Hyatt... Reliability Corporation Docket No. RC11-1, North American Electric Reliability Corporation Docket No. RC11-2...

  5. 78 FR 44557 - Revision to Transmission Vegetation Management Reliability Standard; Notice of Compliance Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-24

    ... Transmission Vegetation Management Reliability Standard; Notice of Compliance Filing Take notice that on July 12, 2013, the North American Electric Reliability Corporation (NERC), pursuant to Order No. 777 \\1... Reliability Standard FAC-003-2 to its Web site. \\1\\ Revisions to Reliability Standard for Transmission...

  6. 77 FR 13585 - Electricity Subsector Cybersecurity Risk Management Process Guideline

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-07

    ... DEPARTMENT OF ENERGY Electricity Subsector Cybersecurity Risk Management Process Guideline AGENCY: Office of Electricity Delivery and Energy Reliability, Department of Energy. ACTION: Notice of public... Electricity Subsector Cybersecurity Risk Management Process guideline. The guideline describes a risk...

  7. 77 FR 30517 - Electricity Subsector Cybersecurity Risk Management Process

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-23

    ... DEPARTMENT OF ENERGY Electricity Subsector Cybersecurity Risk Management Process AGENCY: Office of Electricity Delivery and Energy Reliability, Department of Energy. ACTION: Notice of publication. SUMMARY... Electricity Subsector Cybersecurity Risk Management Process guideline. The guideline describes a risk...

  8. 75 FR 61454 - Electricity Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-05

    ... DEPARTMENT OF ENERGY Electricity Advisory Committee AGENCY: Department of Energy, Office of Electricity Delivery and Energy Reliability. ACTION: Notice of open meeting. SUMMARY: This notice announces the open meeting of the re-established DOE Electricity Advisory Committee. The Federal Advisory...

  9. Assessment of the Present and Future Offshore Wind Power Potential: A Case Study in a Target Territory of the Baltic Sea Near the Latvian Coast

    PubMed Central

    Teilans, Artis

    2013-01-01

    Offshore wind energy development promises to be a significant domestic renewable energy source in Latvia. The reliable prediction of present and future wind resources at offshore sites is crucial for planning and selecting the location for wind farms. The overall goal of this paper is the assessment of offshore wind power potential in a target territory of the Baltic Sea near the Latvian coast as well as the identification of a trend in the future wind energy potential for the study territory. The regional climate model CLM and High Resolution Limited Area Model (Hirlam) simulations were used to obtain the wind climatology data for the study area. The results indicated that offshore wind energy is promising for expanding the national electricity generation and will continue to be a stable resource for electricity generation in the region over the 21st century. PMID:23983619

  10. Demonstration of a 1 MWe biomass power plant at USMC Base Camp Lejeune. Report for July 1994-May 1997

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cleland, J.; Purvis, C.R.

    1998-06-01

    The paper discusses a biomass energy conversion project being sponsored by EPA to demonstrate an enviromentally and economically sound electrical power option for government installations, industrial sites, rural cooperatives, small municipalities, and developing countries. Wood gasification combined with internal combustion engines was chosen because of (1) recent improvements in gas cleaning, (2) simple economical operation for units < 10 MW, and (3) the option of a clean cheap fuel for the many existing facilities generating expensive electricity from petroleum fuels with reciprocating engines. The plant incorporates a downdraft, moving-bed gasifier utilizing hogged waste wood from the Marine Corps Base atmore » Camp Lejeune, NC. A moving-bed bulk wood dryer and both spark ignition and diesel engines are included. Unique process design features are described briefly, relative to the gasifier, wood drying, tar separation, and process control. A test plan for process optimization and demonstration of reliability, economics, and environmental impact is outlined.« less

  11. Evaluation and prediction of solar radiation for energy management based on neural networks

    NASA Astrophysics Data System (ADS)

    Aldoshina, O. V.; Van Tai, Dinh

    2017-08-01

    Currently, there is a high rate of distribution of renewable energy sources and distributed power generation based on intelligent networks; therefore, meteorological forecasts are particularly useful for planning and managing the energy system in order to increase its overall efficiency and productivity. The application of artificial neural networks (ANN) in the field of photovoltaic energy is presented in this article. Implemented in this study, two periodically repeating dynamic ANS, that are the concentration of the time delay of a neural network (CTDNN) and the non-linear autoregression of a network with exogenous inputs of the NAEI, are used in the development of a model for estimating and daily forecasting of solar radiation. ANN show good productivity, as reliable and accurate models of daily solar radiation are obtained. This allows to successfully predict the photovoltaic output power for this installation. The potential of the proposed method for controlling the energy of the electrical network is shown using the example of the application of the NAEI network for predicting the electric load.

  12. Electron beam irradiation processing for industrial and medical applications

    NASA Astrophysics Data System (ADS)

    Ozer, Zehra Nur

    2017-09-01

    In recent years, electron beam processing has been widely used for medical and industrial applications. Electron beam accelerators are reliable and durable equipments that can produce ionizing radiation when it is needed for a particular commercial use. On the industrial scale, accelerators are used to generate electrons in between 0.1-100 MeV energy range. These accelerators are used mainly in plastics, automotive, wire and electric cables, semiconductors, health care, aerospace and environmental industries, as well as numerous researches. This study presents the current applications of electron beam processing in medicine and industry. Also planned study of a design for such a system in the energy range of 200-300 keV is introduced.

  13. Integrating Variable Renewable Energy in Electric Power Markets. Best Practices from International Experience

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cochran, Jaquelin; Bird, Lori; Heeter, Jenny

    Many countries—reflecting very different geographies, markets, and power systems—are successfully managing high levels of variable renewable energy on the electric grid, including that from wind and solar energy. This document summarizes policy best practices that energy ministers and other stakeholders can pursue to ensure that electricity markets and power systems can effectively coevolve with increasing penetrations of variable renewable energy. There is no one-size-fits-all approach; each country studied has crafted its own combination of policies, market designs, and system operations to achieve the system reliability and flexibility needed to successfully integrate renewables. Notwithstanding this diversity, the approaches taken by themore » countries studied all coalesce around five strategic areas: lead public engagement, particularly for new transmission; coordinate and integrate planning; develop rules for market evolution that enable system flexibility; expand access to diverse resources and geographic footprint of operations; and improve system operations. This study also emphatically underscores the value of countries sharing their experiences. The more diverse and robust the experience base from which a country can draw, the more likely that it will be able to implement an appropriate, optimized, and system-wide approach.« less

  14. Reliability measurement for mixed mode failures of 33/11 kilovolt electric power distribution stations.

    PubMed

    Alwan, Faris M; Baharum, Adam; Hassan, Geehan S

    2013-01-01

    The reliability of the electrical distribution system is a contemporary research field due to diverse applications of electricity in everyday life and diverse industries. However a few research papers exist in literature. This paper proposes a methodology for assessing the reliability of 33/11 Kilovolt high-power stations based on average time between failures. The objective of this paper is to find the optimal fit for the failure data via time between failures. We determine the parameter estimation for all components of the station. We also estimate the reliability value of each component and the reliability value of the system as a whole. The best fitting distribution for the time between failures is a three parameter Dagum distribution with a scale parameter [Formula: see text] and shape parameters [Formula: see text] and [Formula: see text]. Our analysis reveals that the reliability value decreased by 38.2% in each 30 days. We believe that the current paper is the first to address this issue and its analysis. Thus, the results obtained in this research reflect its originality. We also suggest the practicality of using these results for power systems for both the maintenance of power systems models and preventive maintenance models.

  15. Reliability Measurement for Mixed Mode Failures of 33/11 Kilovolt Electric Power Distribution Stations

    PubMed Central

    Alwan, Faris M.; Baharum, Adam; Hassan, Geehan S.

    2013-01-01

    The reliability of the electrical distribution system is a contemporary research field due to diverse applications of electricity in everyday life and diverse industries. However a few research papers exist in literature. This paper proposes a methodology for assessing the reliability of 33/11 Kilovolt high-power stations based on average time between failures. The objective of this paper is to find the optimal fit for the failure data via time between failures. We determine the parameter estimation for all components of the station. We also estimate the reliability value of each component and the reliability value of the system as a whole. The best fitting distribution for the time between failures is a three parameter Dagum distribution with a scale parameter and shape parameters and . Our analysis reveals that the reliability value decreased by 38.2% in each 30 days. We believe that the current paper is the first to address this issue and its analysis. Thus, the results obtained in this research reflect its originality. We also suggest the practicality of using these results for power systems for both the maintenance of power systems models and preventive maintenance models. PMID:23936346

  16. 78 FR 9678 - Multi-stakeholder Process To Develop a Voluntary Code of Conduct for Smart Grid Data Privacy

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-11

    ... Grid Data Privacy AGENCY: Office of Electricity Delivery and Energy Reliability, Department of Energy. ACTION: Notice of Open Meeting. SUMMARY: The U.S. Department of Energy, Office of Electricity Delivery and Energy Reliability (DOE OE) will convene the first meeting of the smart grid data privacy...

  17. 77 FR 39858 - Revisions to Electric Reliability Organization Definition of Bulk Electric System and Rules of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-05

    ...'' as used in the NERC Glossary. \\25\\ Id. at 15. \\26\\ Id. at 16. 16. NERC also explains that, while the...: Through http://www.ferc.gov . Documents created electronically using word processing software should be...'s Glossary of Terms Used in Reliability Standards (NERC Glossary) developed by the North American...

  18. 77 FR 69615 - Commission Information Collection Activities (FERC-715); Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-20

    ... transmission planning; A detailed description of the transmission planning reliability criteria used to..., but not limited to, how reliability criteria are applied and the steps taken in [[Page 69616... performance as measured against its stated reliability criteria using its stated assessment practices. The...

  19. Reliable aluminum contact formation by electrostatic bonding

    NASA Astrophysics Data System (ADS)

    Kárpáti, T.; Pap, A. E.; Radnóczi, Gy; Beke, B.; Bársony, I.; Fürjes, P.

    2015-07-01

    The paper presents a detailed study of a reliable method developed for aluminum fusion wafer bonding assisted by the electrostatic force evolving during the anodic bonding process. The IC-compatible procedure described allows the parallel formation of electrical and mechanical contacts, facilitating a reliable packaging of electromechanical systems with backside electrical contacts. This fusion bonding method supports the fabrication of complex microelectromechanical systems (MEMS) and micro-opto-electromechanical systems (MOEMS) structures with enhanced temperature stability, which is crucial in mechanical sensor applications such as pressure or force sensors. Due to the applied electrical potential of  -1000 V the Al metal layers are compressed by electrostatic force, and at the bonding temperature of 450 °C intermetallic diffusion causes aluminum ions to migrate between metal layers.

  20. Characterizing wind power resource reliability in southern Africa

    DOE PAGES

    Fant, Charles; Gunturu, Bhaskar; Schlosser, Adam

    2015-08-29

    Producing electricity from wind is attractive because it provides a clean, low-maintenance power supply. However, wind resource is intermittent on various timescales, thus occasionally introducing large and sudden changes in power supply. A better understanding of this variability can greatly benefit power grid planning. In the following study, wind resource is characterized using metrics that highlight these intermittency issues; therefore identifying areas of high and low wind power reliability in southern Africa and Kenya at different time-scales. After developing a wind speed profile, these metrics are applied at various heights in order to assess the added benefit of raising themore » wind turbine hub. Furthermore, since the interconnection of wind farms can aid in reducing the overall intermittency, the value of interconnecting near-by sites is mapped using two distinct methods. Of the countries in this region, the Republic of South Africa has shown the most interest in wind power investment. For this reason, we focus parts of the study on wind reliability in the country. The study finds that, although mean Wind Power Density is high in South Africa compared to its neighboring countries, wind power resource tends to be less reliable than in other parts of southern Africa—namely central Tanzania. We also find that South Africa’s potential varies over different timescales, with higher reliability in the summer than winter, and higher reliability during the day than at night. This study is concluded by introducing two methods and measures to characterize the value of interconnection, including the use of principal component analysis to identify areas with a common signal.« less

  1. Characterizing wind power resource reliability in southern Africa

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fant, Charles; Gunturu, Bhaskar; Schlosser, Adam

    Producing electricity from wind is attractive because it provides a clean, low-maintenance power supply. However, wind resource is intermittent on various timescales, thus occasionally introducing large and sudden changes in power supply. A better understanding of this variability can greatly benefit power grid planning. In the following study, wind resource is characterized using metrics that highlight these intermittency issues; therefore identifying areas of high and low wind power reliability in southern Africa and Kenya at different time-scales. After developing a wind speed profile, these metrics are applied at various heights in order to assess the added benefit of raising themore » wind turbine hub. Furthermore, since the interconnection of wind farms can aid in reducing the overall intermittency, the value of interconnecting near-by sites is mapped using two distinct methods. Of the countries in this region, the Republic of South Africa has shown the most interest in wind power investment. For this reason, we focus parts of the study on wind reliability in the country. The study finds that, although mean Wind Power Density is high in South Africa compared to its neighboring countries, wind power resource tends to be less reliable than in other parts of southern Africa—namely central Tanzania. We also find that South Africa’s potential varies over different timescales, with higher reliability in the summer than winter, and higher reliability during the day than at night. This study is concluded by introducing two methods and measures to characterize the value of interconnection, including the use of principal component analysis to identify areas with a common signal.« less

  2. The influence of various test plans on mission reliability. [for Shuttle Spacelab payloads

    NASA Technical Reports Server (NTRS)

    Stahle, C. V.; Gongloff, H. R.; Young, J. P.; Keegan, W. B.

    1977-01-01

    Methods have been developed for the evaluation of cost effective vibroacoustic test plans for Shuttle Spacelab payloads. The shock and vibration environments of components have been statistically represented, and statistical decision theory has been used to evaluate the cost effectiveness of five basic test plans with structural test options for two of the plans. Component, subassembly, and payload testing have been performed for each plan along with calculations of optimum test levels and expected costs. The tests have been ranked according to both minimizing expected project costs and vibroacoustic reliability. It was found that optimum costs may vary up to $6 million with the lowest plan eliminating component testing and maintaining flight vibration reliability via subassembly tests at high acoustic levels.

  3. 78 FR 22773 - Revisions to Reliability Standard for Transmission Vegetation Management; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-17

    ...; Order No. 777] Revisions to Reliability Standard for Transmission Vegetation Management; Correction... other requirements the North American Electric Reliability Corporation (NERC) needs to submit when modifying certain Reliability Standards. DATES: Effective on May 28, 2013. FOR FURTHER INFORMATION CONTACT...

  4. 75 FR 71678 - Commission Information Collection Activities; Comment Request; Extension

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-24

    ... Maintenance Reliability Standards'' (OMB Control No. 1902-0247), is required to implement the statutory... Electric Reliability Organization (ERO) to develop mandatory and enforceable reliability standards, which are subject to Commission review and approval. Once approved, the reliability standards may be...

  5. 7 CFR 1730.61 - RUS policy.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., or reliability on the borrower's electric power system or other electric power systems interconnected to the borrower's electric power system. The Agency encourages borrowers to consider model policy... ELECTRIC SYSTEM OPERATIONS AND MAINTENANCE Interconnection of Distributed Resources § 1730.61 RUS policy...

  6. 7 CFR 1730.61 - RUS policy.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., or reliability on the borrower's electric power system or other electric power systems interconnected to the borrower's electric power system. The Agency encourages borrowers to consider model policy... ELECTRIC SYSTEM OPERATIONS AND MAINTENANCE Interconnection of Distributed Resources § 1730.61 RUS policy...

  7. Reliability models: the influence of model specification in generation expansion planning

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stremel, J.P.

    1982-10-01

    This paper is a critical evaluation of reliability methods used for generation expansion planning. It is shown that the methods for treating uncertainty are critical for determining the relative reliability value of expansion alternatives. It is also shown that the specification of the reliability model will not favor all expansion options equally. Consequently, the model is biased. In addition, reliability models should be augmented with an economic value of reliability (such as the cost of emergency procedures or energy not served). Generation expansion evaluations which ignore the economic value of excess reliability can be shown to be inconsistent. The conclusionsmore » are that, in general, a reliability model simplifies generation expansion planning evaluations. However, for a thorough analysis, the expansion options should be reviewed for candidates which may be unduly rejected because of the bias of the reliability model. And this implies that for a consistent formulation in an optimization framework, the reliability model should be replaced with a full economic optimization which includes the costs of emergency procedures and interruptions in the objective function.« less

  8. 76 FR 59732 - Draft Environmental Impact Statement and Draft Habitat Conservation Plan for Oncor Electric...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-27

    ...] Draft Environmental Impact Statement and Draft Habitat Conservation Plan for Oncor Electric Delivery... availability of the draft environmental impact statement (DEIS) and the draft Oncor Electric Delivery Company... announced that Oncor Electric Delivery Company, LLC, has applied under section 10(a)(1)(B) of the Endangered...

  9. 77 FR 53877 - Commission Information Collection Activities (FERC-715); Comment Request; Extension

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-04

    ...; A detailed description of the transmission planning reliability criteria used to evaluate system... reliability criteria are applied and the steps taken in performing transmission planning studies); and A... reliability criteria using its stated assessment practices. The FERC-715 enables the Commission to use the...

  10. A new approach to power quality and electricity reliability monitoring-case study illustrations of the capabilities of the I-GridTM system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Divan, Deepak; Brumsickle, William; Eto, Joseph

    2003-04-01

    This report describes a new approach for collecting information on power quality and reliability and making it available in the public domain. Making this information readily available in a form that is meaningful to electricity consumers is necessary for enabling more informed private and public decisions regarding electricity reliability. The system dramatically reduces the cost (and expertise) needed for customers to obtain information on the most significant power quality events, called voltage sags and interruptions. The system also offers widespread access to information on power quality collected from multiple sites and the potential for capturing information on the impacts ofmore » power quality problems, together enabling a wide variety of analysis and benchmarking to improve system reliability. Six case studies demonstrate selected functionality and capabilities of the system, including: Linking measured power quality events to process interruption and downtime; Demonstrating the ability to correlate events recorded by multiple monitors to narrow and confirm the causes of power quality events; and Benchmarking power quality and reliability on a firm and regional basis.« less

  11. Solid Insulated Switchgear and Investigation of its Mechanical and Electrical Reliability

    NASA Astrophysics Data System (ADS)

    Sato, Junichi; Kinoshita, Susumu; Sakaguchi, Osamu; Miyagawa, Masaru; Shimizu, Toshio; Homma, Mitsutaka

    SF6 gas is applied widely to medium voltage switchgear because of its high insulation reliability and down-sizing ability. However, SF6 gas was placed on the list of greenhouse gases under the Kyoto Protocol in 1997. Since then, the investigation and development concerning SF6-free or less has carried out activity. Therefore, we paid attention to the solid material which has higher dielectric strength than SF6, and we have newly developed solid insulated switchgear (SIS) achieved by molding all main circuit. A new epoxy casting material is applied, which contains a great deal of spherical silica and a small amount of rubber particles. This new material has the high mechanical strength, high thermal resistance, high toughness, and also high dielectric strength because of directly molding the vacuum bottle, down-sizing and reliability. This paper describes about the technology of a new epoxy casting material which achieves the SIS. In addition, the mechanical and electrical reliability test of SIS applied a new epoxy resin are carried out, and effectiveness of the development material and the mechanical and electrical reliability of SIS are verified.

  12. 78 FR 44909 - Regional Reliability Standard BAL-002-WECC-2-Contingency Reserve

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-25

    ...] Regional Reliability Standard BAL-002-WECC-2--Contingency Reserve AGENCY: Federal Energy Regulatory...-002-WECC-2 (Contingency Reserve). The North American Electric Reliability Corporation (NERC) and... contingency reserve required to ensure reliability under normal and abnormal conditions. The Commission also...

  13. 76 FR 65504 - Proposed Agency Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-21

    ..., including the validity of the methodology and assumptions used; (c) ways to enhance the quality, utility... Reliability Standard, FAC- 008-3--Facility Ratings, developed by the North American Electric Reliability... Reliability Standard FAC- 008-3 is pending before the Commission. The proposed Reliability Standard modifies...

  14. 75 FR 29336 - North American Electric Reliability Corporation; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-25

    ... (VSL) assignments for Version 1 of the Critical Infrastructure Protection (CIP) Reliability Standards... Infrastructure Protection Reliability Standards, 130 FERC ] 61,211 at PP 23, 28, 31-33 (2010) (March 18 CIP VSL...

  15. Planning for Power.

    ERIC Educational Resources Information Center

    Failla, Victor A.; Birk, Thomas A.

    1999-01-01

    Discusses the electrical power problems that can arise when schools try to integrate educational technology components into an existing facility, and how to plan the electrical power design to avoid power failures. Examines setting objectives, evaluating current electrical conditions, and developing the technology power design. (GR)

  16. Thermal Management and Reliability of Automotive Power Electronics and Electric Machines

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Narumanchi, Sreekant V; Bennion, Kevin S; Cousineau, Justine E

    Low-cost, high-performance thermal management technologies are helping meet aggressive power density, specific power, cost, and reliability targets for power electronics and electric machines. The National Renewable Energy Laboratory is working closely with numerous industry and research partners to help influence development of components that meet aggressive performance and cost targets through development and characterization of cooling technologies, and thermal characterization and improvements of passive stack materials and interfaces. Thermomechanical reliability and lifetime estimation models are important enablers for industry in cost-and time-effective design.

  17. Management of busbar costs and spending tradeoffs for the transition to competitive markets in electricity

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Corio, M.R.; Boyd, G.

    Competition is changing the fundamental basis for doing business in the electricity generation market. As the market moves toward competitive market conditions, electricity will be viewed increasingly as a commodity--not only supplied to customers within a utility`s service area, but brokered and marketed outside its area as well. With movement toward retail wheeling being considered in California, Michigan, and New York, it may soon become a reality as well. This means that a utility can no longer feel secure as the monopoly supplier of electricity within its own franchise area. To remain the main supplier in its current service areamore » and compete for customers in other service areas, utilities will need to understand and examine all the components of ``busbar costs`` at its generating units. As competition drives the market to marginal costs, generating units with costs exceeding the market clearing price for electricity may soon have a limited role in the generation market. As the industry evolves, competition in the marketplace will force uneconomic plants to reduce costs or go out of business. This paper discusses results of studies addressing the evaluation of cost effectiveness, benchmarking of cost-efficiency, and development of marginal cost curves for busbar costs based on the development and aggregation of the three key measures which determine the cost and level of output (generation): (1) reliability; (2) heat rate; and (3) planned outage factor.« less

  18. Least-cost transportation planning in ODOT : feasibility report.

    DOT National Transportation Integrated Search

    1995-03-01

    Least-Cost Planning or Integrated Resource Planning is used in the electric utility industry to broaden the scope of choices to meet service requirements. This typically includes methods to reduce to demands for electricity as well the more tradition...

  19. Electrical termination techniques

    NASA Technical Reports Server (NTRS)

    Oakey, W. E.; Schleicher, R. R.

    1976-01-01

    A technical review of high reliability electrical terminations for electronic equipment was made. Seven techniques were selected from this review for further investigation, experimental work, and preliminary testing. From the preliminary test results, four techniques were selected for final testing and evaluation. These four were: (1) induction soldering, (2) wire wrap, (3) percussive arc welding, and (4) resistance welding. Of these four, induction soldering was selected as the best technique in terms of minimizing operator errors, controlling temperature and time, minimizing joint contamination, and ultimately producing a reliable, uniform, and reusable electrical termination.

  20. 18 CFR 40.2 - Mandatory Reliability Standards.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...-POWER SYSTEM § 40.2 Mandatory Reliability Standards. (a) Each applicable user, owner or operator of the Bulk-Power System must comply with Commission-approved Reliability Standards developed by the Electric... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Mandatory Reliability...

  1. 18 CFR 40.3 - Availability of Reliability Standards.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Availability of Reliability Standards. 40.3 Section 40.3 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... THE BULK-POWER SYSTEM § 40.3 Availability of Reliability Standards. The Electric Reliability...

  2. Wholesale electricity market design with increasing levels of renewable generation: Revenue sufficiency and long-term reliability

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Milligan, Michael; Frew, Bethany A.; Bloom, Aaron

    This paper discusses challenges that relate to assessing and properly incentivizing the resources necessary to ensure a reliable electricity system with growing penetrations of variable generation (VG). The output of VG (primarily wind and solar generation) varies over time and cannot be predicted precisely. Therefore, the energy from VG is not always guaranteed to be available at times when it is most needed. This means that its contribution towards resource adequacy can be significantly less than the contribution from traditional resources. Variable renewable resources also have near-zero variable costs, and with production-based subsidies they may even have negative offer costs.more » Because variable costs drive the spot price of energy, this can lead to reduced prices, sales, and therefore revenue for all resources within the energy market. The characteristics of VG can also result in increased price volatility as well as the need for more flexibility in the resource fleet in order to maintain system reliability. Furthermore, we explore both traditional and evolving electricity market designs in the United States that aim to ensure resource adequacy and sufficient revenues to recover costs when those resources are needed for long-term reliability. We also investigate how reliability needs may be evolving and discuss how VG may affect future electricity market designs.« less

  3. Wholesale electricity market design with increasing levels of renewable generation: Revenue sufficiency and long-term reliability

    DOE PAGES

    Milligan, Michael; Frew, Bethany A.; Bloom, Aaron; ...

    2016-03-22

    This paper discusses challenges that relate to assessing and properly incentivizing the resources necessary to ensure a reliable electricity system with growing penetrations of variable generation (VG). The output of VG (primarily wind and solar generation) varies over time and cannot be predicted precisely. Therefore, the energy from VG is not always guaranteed to be available at times when it is most needed. This means that its contribution towards resource adequacy can be significantly less than the contribution from traditional resources. Variable renewable resources also have near-zero variable costs, and with production-based subsidies they may even have negative offer costs.more » Because variable costs drive the spot price of energy, this can lead to reduced prices, sales, and therefore revenue for all resources within the energy market. The characteristics of VG can also result in increased price volatility as well as the need for more flexibility in the resource fleet in order to maintain system reliability. Furthermore, we explore both traditional and evolving electricity market designs in the United States that aim to ensure resource adequacy and sufficient revenues to recover costs when those resources are needed for long-term reliability. We also investigate how reliability needs may be evolving and discuss how VG may affect future electricity market designs.« less

  4. 76 FR 16691 - Western Electric Coordinating Council Qualified Transfer Path Unscheduled Flow Relief Regional...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-25

    ... of the Western Electricity Coordinating Council (WECC) IRO-006-WECC-1 (Qualified Transfer Path... the Western Electricity Coordinating Council (WECC) IRO-006-WECC-1 (Qualified Transfer Path...: Balancing Authorities and Reliability Coordinator in the Western Electricity Coordinating Council. Frequency...

  5. Assessment of deep tissue hyperalgesia in the groin - a method comparison of electrical vs. pressure stimulation.

    PubMed

    Aasvang, E K; Werner, M U; Kehlet, H

    2014-09-01

    Deep pain complaints are more frequent than cutaneous in post-surgical patients, and a prevalent finding in quantitative sensory testing studies. However, the preferred assessment method - pressure algometry - is indirect and tissue unspecific, hindering advances in treatment and preventive strategies. Thus, there is a need for development of methods with direct stimulation of suspected hyperalgesic tissues to identify the peripheral origin of nociceptive input. We compared the reliability of an ultrasound-guided needle stimulation protocol of electrical detection and pain thresholds to pressure algometry, by performing identical test-retest sequences 10 days apart, in deep tissues in the groin region. Electrical stimulation was performed by five up-and-down staircase series of single impulses of 0.04 ms duration, starting from 0 mA in increments of 0.2 mA until a threshold was reached and descending until sensation was lost. Method reliability was assessed by Bland-Altman plots, descriptive statistics, coefficients of variance and intraclass correlation coefficients. The electrical stimulation method was comparable to pressure algometry regarding 10 days test-retest repeatability, but with superior same-day reliability for electrical stimulation (P < 0.05). Between-subject variance rather than within-subject variance was the main source for test variation. There were no systematic differences in electrical thresholds across tissues and locations (P > 0.05). The presented tissue-specific direct deep tissue electrical stimulation technique has equal or superior reliability compared with the indirect tissue-unspecific stimulation by pressure algometry. This method may facilitate advances in mechanism based preventive and treatment strategies in acute and chronic post-surgical pain states. © 2014 The Acta Anaesthesiologica Scandinavica Foundation. Published by John Wiley & Sons Ltd.

  6. Reliability program requirements for aeronautical and space system contractors

    NASA Technical Reports Server (NTRS)

    1987-01-01

    General reliability program requirements for NASA contracts involving the design, development, fabrication, test, and/or use of aeronautical and space systems including critical ground support equipment are prescribed. The reliability program requirements require (1) thorough planning and effective management of the reliability effort; (2) definition of the major reliability tasks and their place as an integral part of the design and development process; (3) planning and evaluating the reliability of the system and its elements (including effects of software interfaces) through a program of analysis, review, and test; and (4) timely status indication by formal documentation and other reporting to facilitate control of the reliability program.

  7. Blazing the trailway: Nuclear electric propulsion and its technology program plans

    NASA Technical Reports Server (NTRS)

    Doherty, Michael P.

    1992-01-01

    An overview is given of the plans for a program in nuclear electric propulsion (NEP) technology for space applications being considered by NASA, DOE, and DOD. Possible missions using NEP are examined, and NEP technology plans are addressed regarding concept development, systems engineering, nuclear fuels, power conversion, thermal management, power management and distribution, electric thrusters, facilities, and issues related to safety and environment. The programmatic characteristics are considered.

  8. Reliability and economy -- Hydro electricity for Iran

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jahromi-Shirazi, M.J.; Zarbakhsh, M.H.

    1998-12-31

    Reliability is the probability that a device or system will perform its function adequately, for the period of time intended, under the operating conditions intended. Reliability and economy are two important factors in operating any system, especially in power generation. Due to the high rate in population growth in Iran, the experts have estimated that the demand for electricity will be about 63,000 MW in the next 25 years, the installed power is now about 26,000 MW. Therefore, the energy policy decision made in Iran is to go to power generation by hydroelectric plants because of reliability, availability of watermore » resources and the economics of hydroelectric power.« less

  9. 46 CFR 107.305 - Plans and information.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... systems. Marine Engineering (z) Plans required for marine engineering equipment and systems by Subchapter F of this chapter. Electrical Engineering (aa) Plans required for electrical engineering equipment... materials that do not conform to ABS or ASTM specifications, complete specifications, including chemical and...

  10. Extended performance solar electric propulsion thrust system study. Volume 3: Tradeoff studies of alternate thrust system configurations

    NASA Technical Reports Server (NTRS)

    Hawthorne, E. I.

    1977-01-01

    Several thrust system design concepts were evaluated and compared using the specifications of the most advanced 30 cm engineering model thruster as the technology base. Emphasis was placed on relatively high power missions. The extensions in thruster performance required for the Halley's comet mission were defined and alternative thrust system concepts were designed in sufficient detail for comparing mass, efficiency, reliability, structure, and thermal characteristics. Confirmation testing and analysis of thruster and power-processing components were performed. A baseline design was selected from the alternatives considered, and the design analysis and documentation were refined. A program development plan was formulated that outlines the work structure considered necessary for developing, qualifying, and fabricating the flight hardware for the baseline thrust system within the time frame of a project to rendezvous with Halley's comet. An assessment was made of the costs and risks associated with a baseline thrust system as provided to the mission project under this plan. Critical procurements and interfaces were identified and defined.

  11. Exploring the meteorological potential for planning a high performance European electricity super-grid: optimal power capacity distribution among countries

    NASA Astrophysics Data System (ADS)

    Santos-Alamillos, Francisco J.; Brayshaw, David J.; Methven, John; Thomaidis, Nikolaos S.; Ruiz-Arias, José A.; Pozo-Vázquez, David

    2017-11-01

    The concept of a European super-grid for electricity presents clear advantages for a reliable and affordable renewable power production (photovoltaics and wind). Based on the mean-variance portfolio optimization analysis, we explore optimal scenarios for the allocation of new renewable capacity at national level in order to provide to energy decision-makers guidance about which regions should be mostly targeted to either maximize total production or reduce its day-to-day variability. The results show that the existing distribution of renewable generation capacity across Europe is far from optimal: i.e. a ‘better’ spatial distribution of resources could have been achieved with either a ~31% increase in mean power supply (for the same level of day-to-day variability) or a ~37.5% reduction in day-to-day variability (for the same level of mean productivity). Careful planning of additional increments in renewable capacity at the European level could, however, act to significantly ameliorate this deficiency. The choice of where to deploy resources depends, however, on the objective being pursued—if the goal is to maximize average output, then new capacity is best allocated in the countries with highest resources, whereas investment in additional capacity in a north/south dipole pattern across Europe would act to most reduce daily variations and thus decrease the day-to-day volatility of renewable power supply.

  12. 2015 California Demand Response Potential Study - Charting California’s Demand Response Future. Interim Report on Phase 1 Results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Alstone, Peter; Potter, Jennifer; Piette, Mary Ann

    Demand response (DR) is an important resource for keeping the electricity grid stable and efficient; deferring upgrades to generation, transmission, and distribution systems; and providing other customer economic benefits. This study estimates the potential size and cost of the available DR resource for California’s three investor-owned utilities (IOUs), as the California Public Utilities Commission (CPUC) evaluates how to enhance the role of DR in meeting California’s resource planning needs and operational requirements. As the state forges a clean energy future, the contributions of wind and solar electricity from centralized and distributed generation will fundamentally change the power grid’s operational dynamics.more » This transition requires careful planning to ensure sufficient capacity is available with the right characteristics – flexibility and fast response – to meet reliability needs. Illustrated is a snapshot of how net load (the difference between demand and intermittent renewables) is expected to shift. Increasing contributions from renewable generation introduces steeper ramps and a shift, into the evening, of the hours that drive capacity needs. These hours of peak capacity need are indicated by the black dots on the plots. Ultimately this study quantifies the ability and the cost of using DR resources to help meet the capacity need at these forecasted critical hours in the state.« less

  13. 18 CFR 39.11 - Reliability reports.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Electric Reliability Organization shall conduct assessments of the adequacy of the Bulk-Power System in... assessments as determined by the Commission of the reliability of the Bulk-Power System in North America and... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Reliability reports. 39...

  14. 76 FR 28014 - Commission Information Collection Activities (FERC-600); Comment Request; Extension

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-13

    ... complaint, may order the Electric Reliability Organization to submit to the Commission a proposed reliability standard or a modification to a reliability standard that addresses a specific matter if the Commission considers such a new or modified reliability standard appropriate to carry out this section...

  15. Quantifying impacts of heat waves on power grid operation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ke, Xinda; Wu, Di; Rice, Jennie S.

    Climate change is projected to cause an increase in the severity and frequency of extreme weather events such as heat waves and droughts. Such changes present planning and operating challenges and risks to many economic sectors. In the electricity sector, statistics of extreme events in the past have been used to help plan for future peak loads, determine associated infrastructure requirements, and evaluate operational risks, but industry-standard planning tools have yet to be coupled with or informed by temperature models to explore the impacts of the "new normal" on planning studies. For example, high ambient temperatures during heat waves reducemore » the output capacity and efficiency of gas fired combustion turbines just when they are needed most to meet peak demands. This paper describes the development and application of a production cost and unit commitment model coupled to high resolution, hourly temperature data and a temperature dependent load model. The coupled system has the ability to represent the impacts of hourly temperatures on load conditions and available capacity and efficiency of combustion turbines, and therefore capture the potential impacts on system reliability and production cost. Ongoing work expands this capability to address the impacts of water availability and temperature on power grid operation.« less

  16. From Ions to Wires to the Grid: The Transformational Science of LANL Research in High-Tc Superconducting Tapes and Electric Power Applications

    ScienceCinema

    Marken, Ken

    2018-01-09

    The Department of Energy (DOE) Office of Electricity Delivery and Energy Reliability (OE) has been tasked to lead national efforts to modernize the electric grid, enhance security and reliability of the energy infrastructure, and facilitate recovery from disruptions to energy supplies. LANL has pioneered the development of coated conductors – high-temperature superconducting (HTS) tapes – which permit dramatically greater current densities than conventional copper cable, and enable new technologies to secure the national electric grid. Sustained world-class research from concept, demonstration, transfer, and ongoing industrial support has moved this idea from the laboratory to the commercial marketplace.

  17. 7 CFR 1724.53 - Preparation of plans and specifications.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES Electric System Design § 1724.53 Preparation of plans and specifications. The provisions of this section apply to all borrower electric system facilities regardless of the source of financing. (a...

  18. 7 CFR 1724.53 - Preparation of plans and specifications.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES Electric System Design § 1724.53 Preparation of plans and specifications. The provisions of this section apply to all borrower electric system facilities regardless of the source of financing. (a...

  19. 7 CFR 1724.53 - Preparation of plans and specifications.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES Electric System Design § 1724.53 Preparation of plans and specifications. The provisions of this section apply to all borrower electric system facilities regardless of the source of financing. (a...

  20. 7 CFR 1724.53 - Preparation of plans and specifications.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES Electric System Design § 1724.53 Preparation of plans and specifications. The provisions of this section apply to all borrower electric system facilities regardless of the source of financing. (a...

  1. 75 FR 38514 - Application to Export Electric Energy; Brookfield Energy Marketing LP

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-02

    ... Energy Marketing LP AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of application. SUMMARY: Brookfield Energy Marketing LP (BEM LP) has applied for authority to transmit electric... surplus energy purchased from electric utilities, Federal power marketing agencies and other entities...

  2. 76 FR 11437 - Application To Export Electric Energy; Societe Generale Energy Corp.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-02

    ... DEPARTMENT OF ENERGY [OE Docket No. EA-376] Application To Export Electric Energy; Societe Generale Energy Corp. AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of application. SUMMARY: Societe Generale Energy Corp. (SGEC) has applied for authority to transmit electric...

  3. 76 FR 3882 - Application To Export Electric Energy; Intercom Energy, Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-21

    ... DEPARTMENT OF ENERGY [OE Docket No. EA-289-B] Application To Export Electric Energy; Intercom Energy, Inc. AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of application. SUMMARY: Intercom Energy, Inc. (Intercom) has applied to renew its authority to transmit electric...

  4. Status of TMI-2 instruments and electrical components

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Helbert, H J

    In the Task 1.0 section of the GEND 001 Planning Report, the Instrumentation and Electrical Equipment Survivability Planning Group (IEPG) supplied planning, guidance, and recommendations on collecting survivability data on instruments and electrical equipment involved in the March 28, 1979, accident at the Three Mile Island Unit 2 (TMI-2) Reactor. GEND 001 recommended collection of further data on the status of all the instruments and electrical equipment it listed. The current report supplies information concerning the operational status of instruments and electrical equipment listed in the Task 1.0 section of GEND 001. This document will be updated in the futuremore » as additional information is obtained.« less

  5. Socio-economic benefits of electric power

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clemente, F.

    1979-01-01

    Empirical evidence and actual experience strongly demonstrate that the socio-economic benefits of electric power have received less than adequate attention. In terms of the reliability issue, so much emphasis has been placed on the cost of having electricity that the cost of not having reliable power has been ignored. Apart from a few comments on jobs or taxes, the Environmental Impact Statements submitted by utilities generally ignore the broad range of socio-economic (quality of life) benefits the proposed facility will have for the local community, the region, and society at large. The author feels strongly that electric utilities should notmore » look askance at the soft sciences, but should begin to utilize them. Sociology, social welfare, and macroeconomics remain fertile ground for the electric-power industry. The techniques and concepts of the social sciences can be readily utilized to identify and document many heretofore unarticulated socio-economic benefits of electric power.« less

  6. 18 CFR 292.308 - Standards for operating reliability.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... reliability. 292.308 Section 292.308 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... SMALL POWER PRODUCTION AND COGENERATION Arrangements Between Electric Utilities and Qualifying... may establish reasonable standards to ensure system safety and reliability of interconnected...

  7. 37. ELECTRICAL PLAN AND DETAILS. SHOWS PLANNED LOCATION OF PORTABLE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    37. ELECTRICAL PLAN AND DETAILS. SHOWS PLANNED LOCATION OF PORTABLE GENERATOR. FUNCTION OF FOUR-FOOT SQUARE PIT IS SHOWN AS 'D.C. POWER SUPPLY PIT.' F.C. TORKELSON DRAWING NUMBER 842-ARVFS-701-E-1. INEL INDEX CODE NUMBER: 075 0701 10 851 151973. - Idaho National Engineering Laboratory, Advanced Reentry Vehicle Fusing System, Scoville, Butte County, ID

  8. Validating the Electric Maze Task as a Measure of Planning

    ERIC Educational Resources Information Center

    Sheppard, Kelly W.; Cheatham, Carol L.

    2017-01-01

    The Electric Maze Task (EMT) is a novel planning task designed to allow flexible testing of planning abilities across a broad age range and to incorporate manipulations to test underlying planning abilities, such as working-memory and inhibitory control skills. The EMT was tested in a group of 63 typically developing 7- to 12-year-olds.…

  9. Towards Smart Grid Dynamic Ratings

    NASA Astrophysics Data System (ADS)

    Cheema, Jamal; Clark, Adrian; Kilimnik, Justin; Pavlovski, Chris; Redman, David; Vu, Maria

    2011-08-01

    The energy distribution industry is giving greater attention to smart grid solutions as a means for increasing the capabilities, efficiency and reliability of the electrical power network. The smart grid makes use of intelligent monitoring and control devices throughout the distribution network to report on electrical properties such as voltage, current and power, as well as raising network alarms and events. A further aspect of the smart grid embodies the dynamic rating of electrical assets of the network. This fundamentally involves a rating of the load current capacity of electrical assets including feeders, transformers and switches. The mainstream approach to rate assets is to apply the vendor plate rating, which often under utilizes assets, or in some cases over utilizes when environmental conditions reduce the effective rated capacity, potentially reducing lifetime. Using active intelligence we have developed a rating system that rates assets in real time based upon several events. This allows for a far more efficient and reliable electrical grid that is able to extend further the life and reliability of the electrical network. In this paper we describe our architecture, the observations made during development and live deployment of the solution into operation. We also illustrate how this solution blends with the smart grid by proposing a dynamic rating system for the smart grid.

  10. Development of battery management system for nickel-metal hydride batteries in electric vehicle applications

    NASA Astrophysics Data System (ADS)

    Jung, Do Yang; Lee, Baek Haeng; Kim, Sun Wook

    Electric vehicle (EV) performance is very dependent on traction batteries. For developing electric vehicles with high performance and good reliability, the traction batteries have to be managed to obtain maximum performance under various operating conditions. Enhancement of battery performance can be accomplished by implementing a battery management system (BMS) that plays an important role in optimizing the control mechanism of charge and discharge of the batteries as well as monitoring the battery status. In this study, a BMS has been developed for maximizing the use of Ni-MH batteries in electric vehicles. This system performs several tasks: the control of charging and discharging, overcharge and over-discharge protection, the calculation and display of state-of-charge (SOC), safety, and thermal management. The BMS is installed in and tested in a DEV5-5 electric vehicle developed by Daewoo Motor Co. and the Institute for Advanced Engineering in Korea. Eighteen modules of a Panasonic nickel-metal hydride (Ni-MH) battery, 12 V, 95 A h, are used in the DEV5-5. High accuracy within a range of 3% and good reliability are obtained. The BMS can also improve the performance and cycle-life of the Ni-MH battery peak, as well as the reliability and the safety of the electric vehicles.

  11. 75 FR 57911 - Application to Export Electric Energy; EDF Trading North America, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-23

    ... the proposed action will not adversely impact on the reliability of the U.S. electric power supply... from electric utilities, Federal power marketing agencies and other entities within the United States... DEPARTMENT OF ENERGY [OE Docket No. EA-373] Application to Export Electric Energy; EDF Trading...

  12. 75 FR 75994 - Application To Export Electric Energy; NRG Power Marketing LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-07

    ... Marketing LLC AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of application. SUMMARY: NRG Power Marketing LLC (NRGPML) has applied to renew its authority to transmit electric... to Canada would be surplus energy purchased from electric utilities, Federal power marketing agencies...

  13. 76 FR 50476 - Application To Export Electric Energy; Glacial Energy of Texas, Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-15

    ... DEPARTMENT OF ENERGY [OE Docket No. EA-382] Application To Export Electric Energy; Glacial Energy of Texas, Inc. AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of Application. SUMMARY: Glacial Energy of Texas, Inc. (Glacial) has applied for authority to transmit electric...

  14. 78 FR 64207 - Application To Export Electric Energy; TEC Energy Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-28

    ... DEPARTMENT OF ENERGY [OE Docket No. EA-388] Application To Export Electric Energy; TEC Energy Inc. AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of Application. SUMMARY: TEC Energy Inc. (TEC) has applied for authority to transmit electric energy from the United...

  15. Bearing Procurement Analysis Method by Total Cost of Ownership Analysis and Reliability Prediction

    NASA Astrophysics Data System (ADS)

    Trusaji, Wildan; Akbar, Muhammad; Sukoyo; Irianto, Dradjad

    2018-03-01

    In making bearing procurement analysis, price and its reliability must be considered as decision criteria, since price determines the direct cost as acquisition cost and reliability of bearing determine the indirect cost such as maintenance cost. Despite the indirect cost is hard to identify and measured, it has high contribution to overall cost that will be incurred. So, the indirect cost of reliability must be considered when making bearing procurement analysis. This paper tries to explain bearing evaluation method with the total cost of ownership analysis to consider price and maintenance cost as decision criteria. Furthermore, since there is a lack of failure data when bearing evaluation phase is conducted, reliability prediction method is used to predict bearing reliability from its dynamic load rating parameter. With this method, bearing with a higher price but has higher reliability is preferable for long-term planning. But for short-term planning the cheaper one but has lower reliability is preferable. This contextuality can give rise to conflict between stakeholders. Thus, the planning horizon needs to be agreed by all stakeholder before making a procurement decision.

  16. 76 FR 75875 - Plan for Conduct of 2012 Electric Transmission Congestion Study

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-05

    ... DEPARTMENT OF ENERGY Plan for Conduct of 2012 Electric Transmission Congestion Study AGENCY... preparation of a study of electric transmission congestion pursuant to section 216(a)(1) of the Federal Power...-register at this Web site: http://energy.gov/oe/congestion-study-2012 . [[Page 75876

  17. 18 CFR 39.8 - Delegation to a Regional Entity.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... agreement promotes effective and efficient administration of Bulk-Power System reliability. (d) The... Interconnection-wide basis promotes effective and efficient administration of Bulk-Power System reliability and... THE ELECTRIC RELIABILITY ORGANIZATION; AND PROCEDURES FOR THE ESTABLISHMENT, APPROVAL, AND ENFORCEMENT...

  18. 76 FR 45237 - Commission Information Collection Activities (FERC-600); Comment Request; Submitted for OMB Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-28

    ... own motion or upon complaint, may order the Electric Reliability Organization to submit to the Commission a proposed reliability standard or a modification to a reliability standard that addresses a specific matter if the Commission considers such a new or modified reliability standard appropriate to...

  19. Study of aircraft electrical power systems

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The formulation of a philosophy for devising a reliable, efficient, lightweight, and cost effective electrical power system for advanced, large transport aircraft in the 1980 to 1985 time period is discussed. The determination and recommendation for improvements in subsystems and components are also considered. All aspects of the aircraft electrical power system including generation, conversion, distribution, and utilization equipment were considered. Significant research and technology problem areas associated with the development of future power systems are identified. The design categories involved are: (1) safety-reliability, (2) power type, voltage, frequency, quality, and efficiency, (3) power control, and (4) selection of utilization equipment.

  20. Recent Trend of New Type Power Delivery System and its Demonstrative Project in Japan

    NASA Astrophysics Data System (ADS)

    Morozumi, Satoshi; Nara, Koichi

    Recently many such distributed generating systems as co-generation, photovoltaic, wind, fuel cells etc. are introduced into power distribution system, and the power system must cope with the situation with distributed generators. Moreover, such industries as IT request reliable and high quality power to preserve their businesses, and some other electric energy based industries request less reliable but cheaper electricity. From these backgrounds, several new type power delivery systems are emerging where lots of distributed generators (DGs) can be connected and many benefits offered by DGs can be realized without affecting the existing power system. They are referred to various names. In U.S.A., Microgrid, Power Park and Virtual Utilities, etc. are proposed. In Europe, DISPOWER or Smart Grid is under developing. In Japan, FRIENDS and Demand Area Network System etc. are proposed and tested in real sites. In this paper, first, general concepts of such new type power delivery systems and new businesses expected to be created by using DGs are introduced. Then, recent research activities in this area in Japan are introduced so as to stimulate new business opportunities. In the later part of this paper, related NEDO's demonstrative projects are introduced. NEDO is the largest public R&D management organization and promoting several projects regarding grid connecting issues on the power system. Those projects were planned to solve several problems on the power system where distributed renewable energy resources are installed.

  1. Optimal Wind Power Uncertainty Intervals for Electricity Market Operation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wang, Ying; Zhou, Zhi; Botterud, Audun

    It is important to select an appropriate uncertainty level of the wind power forecast for power system scheduling and electricity market operation. Traditional methods hedge against a predefined level of wind power uncertainty, such as a specific confidence interval or uncertainty set, which leaves the questions of how to best select the appropriate uncertainty levels. To bridge this gap, this paper proposes a model to optimize the forecast uncertainty intervals of wind power for power system scheduling problems, with the aim of achieving the best trade-off between economics and reliability. Then we reformulate and linearize the models into a mixedmore » integer linear programming (MILP) without strong assumptions on the shape of the probability distribution. In order to invest the impacts on cost, reliability, and prices in a electricity market, we apply the proposed model on a twosettlement electricity market based on a six-bus test system and on a power system representing the U.S. state of Illinois. The results show that the proposed method can not only help to balance the economics and reliability of the power system scheduling, but also help to stabilize the energy prices in electricity market operation.« less

  2. Sample size planning for composite reliability coefficients: accuracy in parameter estimation via narrow confidence intervals.

    PubMed

    Terry, Leann; Kelley, Ken

    2012-11-01

    Composite measures play an important role in psychology and related disciplines. Composite measures almost always have error. Correspondingly, it is important to understand the reliability of the scores from any particular composite measure. However, the point estimates of the reliability of composite measures are fallible and thus all such point estimates should be accompanied by a confidence interval. When confidence intervals are wide, there is much uncertainty in the population value of the reliability coefficient. Given the importance of reporting confidence intervals for estimates of reliability, coupled with the undesirability of wide confidence intervals, we develop methods that allow researchers to plan sample size in order to obtain narrow confidence intervals for population reliability coefficients. We first discuss composite reliability coefficients and then provide a discussion on confidence interval formation for the corresponding population value. Using the accuracy in parameter estimation approach, we develop two methods to obtain accurate estimates of reliability by planning sample size. The first method provides a way to plan sample size so that the expected confidence interval width for the population reliability coefficient is sufficiently narrow. The second method ensures that the confidence interval width will be sufficiently narrow with some desired degree of assurance (e.g., 99% assurance that the 95% confidence interval for the population reliability coefficient will be less than W units wide). The effectiveness of our methods was verified with Monte Carlo simulation studies. We demonstrate how to easily implement the methods with easy-to-use and freely available software. ©2011 The British Psychological Society.

  3. The all electric airplane-benefits and challenges

    NASA Technical Reports Server (NTRS)

    Spitzer, C. R.; Hood, R. V.

    1982-01-01

    The all electric aircraft considered in the present investigation is an aircraft which has digital flight crucial controls, electromechanical actuators, and electrical secondary power. There are no hydraulic or pneumatic systems. The characteristics of an all electric aircraft are related to reduced acquisition cost, reduced weight, reduced fuel consumption, increased reliability, reduced support equipment, simpler maintenance, an expanded flight envelope, and improved survivability. An additional benefit is the dramatically increased design flexibility and mission adaptability. However, the implementation of the all electric aircraft concept requires the resolution of a number of major technology issues. Issues in the digital flight controls area are related to achieving the required levels of safety and reliability in a cost effective manner. Other challenges which have to be met are concerned with electromechanical actuators, environmental control and ice protection systems, and engine technology.

  4. Low-grade geothermal energy conversion by organic Rankine cycle turbine generator

    NASA Astrophysics Data System (ADS)

    Zarling, J. P.; Aspnes, J. D.

    Results of a demonstration project which helped determine the feasibility of converting low-grade thermal energy in 49 C water into electrical energy via an organic Rankine cycle 2500 watt (electrical) turbine-generator are presented. The geothermal source which supplied the water is located in a rural Alaskan village. The reasons an organic Rankine cycle turbine-generator was investigated as a possible source of electric power in rural Alaska are: (1) high cost of operating diesel-electric units and their poor long-term reliability when high-quality maintenance is unavailable and (2) the extremely high level of long-term reliability reportedly attained by commercially available organic Rankine cycle turbines. Data is provided on the thermal and electrical operating characteristics of an experimental organic Rankine cycle turbine-generator operating at a uniquely low vaporizer temperature.

  5. Electric power supply and demand for the contiguous United States, 1981 - 1990

    NASA Astrophysics Data System (ADS)

    1981-07-01

    The outlook for electric power supply and demand in the United States decade 1981 to 1990 is reviewed from the perspective of reliability and adequacy of service. Electric power supply adequacy as projected for the nine Regional Reliability Council areas of the contiguous United States is reported as well as interruptible load data reported by the Councils. cogeneration is discussed. Each of the 27 electric regions (sub-areas of the nine Council areas) in the contiguous US are studied. A glossary of terms is given. Appendices describe the Council structure, and include a copy of the ERA-411 Manual, which contains all the items to which the Councils were asked to respond. The utilities with included data, the Staff Report, Estimated Electric Demand and Supply for Summer 1981, Contiguous United States dated May 1981 are included.

  6. 20--500 watt AMTEC auxiliary electric power system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ivanenok, J.F. III; Sievers, R.K.

    1996-12-31

    Numerous design studies have been completed on Alkali Metal Thermal to Electric Converter (AMTEC) power systems for space applications demonstrating their substantial increase in performance. Recently design studies have been initiated to couple AMTEC power conversion with fossil fueled combustion systems. This paper describes the results of a Phase 1 SBIR effort to design an innovative, efficient, reliable, long life AMTEC Auxiliary Electric Power System (AEPS) for remote site applications (20--500 watts). The concept uses high voltage AMTEC cells, each containing 7 to 9 small electrolyte tubes, integrated with a combustor and recuperator. These multi-tube AMTEC cells are low cost,more » reliable, long life static converters. AMTEC technology is ideal for auxiliary electric power supplies that must operate reliably over a broad range of temperatures, fuel sources, power levels, and operational specifications. The simplicity, efficiency (20% systems) and modularity of this technology allow it to fill applications as varied as light-weight backpacks, remote site power supplies, and military base power. Phase 1 demonstrated the feasibility of a 20% system design, and showed that the development needs to focus on identifying long life AMTEC cell components, determining the AMTEC cell and system reliability, and demonstrating that a 20 watt AMTEC system is 3--5 times more efficient than existing systems for the same application.« less

  7. Image storage in radiation oncology: What did we learn from diagnostic radiology?

    NASA Astrophysics Data System (ADS)

    Blodgett, Kurt; Luick, Marc; Colonias, Athanasios; Gayou, Olivier; Karlovits, Stephen; Werts, E. Day

    2009-02-01

    The Digital Imaging and Communications in Medicine (DICOM) standard was developed by the National Electrical Manufacturers Association (NEMA) and the American College of Radiology (ACR) for medical image archiving and retrieval. An extension to this implemented a standard named DICOM-RT for use in Radiation Oncology. There are currently seven radiotherapy-specific DICOM objects which include: RT Structure Set, RT Plan, RT Dose, RT Image, RT Beams Treatment Record, RT Brachy Treatment Record, and RT Treatment Summary Record. The type of data associated with DICOM-RT includes (1) Radiation treatment planning datasets (CT, MRI, PET) with radiation treatment plans showing beam arrangements, isodose distributions, and dose volume histograms of targets/normal tissues and (2) Image-guided radiation modalities such as Siemens MVision mega-voltage cone beam CT (MV-CBCT). With the advent of such advancing technologies, there has been an exponential increase in image data collected for each patient, and the need for reliable and accessible image storage has become critical. A potential solution is a Radiation Oncology specific picture archiving and communication systems (PACS) that would allow data storage from multiple vendor devices and support the storage and retrieval needs not only of a single site but of a large, multi-facility network of radiation oncology clinics. This PACS system must be reliable, expandable, and cost-effective to operate while protecting sensitive patient image information in a Health Insurance Portability and Accountability Act (HIPAA) compliant environment. This paper emphasizes the expanding DICOM-RT storage requirements across our network of 8 radiation oncology clinics and the initiatives we undertook to address the increased volume of data by using the ImageGrid (CANDELiS Inc, Irvine CA) server and the IGViewer license (CANDELiS Inc, Irvine CA) to create a DICOM-RT compatible PACS system.

  8. 46 CFR 110.25-1 - Plans and information required for new construction.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ....25-1 Section 110.25-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Plan Submittal § 110.25-1 Plans and information required for new construction... available at the point of application. (b) Electrical plant load analysis including connected loads and...

  9. 46 CFR 110.25-1 - Plans and information required for new construction.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ....25-1 Section 110.25-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Plan Submittal § 110.25-1 Plans and information required for new construction... available at the point of application. (b) Electrical plant load analysis including connected loads and...

  10. Ring-like reliable PON planning with physical constraints for a smart grid

    NASA Astrophysics Data System (ADS)

    Wang, Xin; Gu, Rentao; Ji, Yuefeng

    2016-01-01

    Due to the high reliability requirements in the communication networks of a smart grid, a ring-like reliable PON is an ideal choice to carry power distribution information. Economical network planning is also very important for the smart grid communication infrastructure. Although the ring-like reliable PON has been widely used in the real applications, as far as we know, little research has been done on the network optimization subject of the ring-like reliable PON. Most PON planning research studies only consider a star-like topology or cascaded PON network, which barely guarantees the reliability requirements of the smart grid. In this paper, we mainly investigate the economical network planning problem for the ring-like reliable PON of the smart grid. To address this issue, we built a mathematical model for the planning problem of the ring-like reliable PON, and the objective was to minimize the total deployment costs under physical constraints. The model is simplified such that all of the nodes have the same properties, except OLT, because each potential splitter site can be located in the same ONU position in power communication networks. The simplified model is used to construct an optimal main tree topology in the complete graph and a backup-protected tree topology in the residual graph. An efficient heuristic algorithm, called the Constraints and Minimal Weight Oriented Fast Searching Algorithm (CMW-FSA), is proposed. In CMW-FSA, a feasible solution can be obtained directly with oriented constraints and a few recursive search processes. From the simulation results, the proposed planning model and CMW-FSA are verified to be accurate (the error rates are less than 0.4%) and effective compared with the accurate solution (CAESA), especially in small and sparse scenarios. The CMW-FSA significantly reduces the computation time compared with the CAESA. The time complexity algorithm of the CMW-FSA is acceptable and calculated as T(n) = O(n3). After evaluating the effects of the parameters of the two PON systems, the total planning costs of each scenario show a general declining trend and reach a threshold as the respective maximal transmission distances and maximal time delays increase.

  11. 77 FR 11515 - Application To Export Electric Energy; Pilot Power Group, Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-27

    ... reliability of the U.S. electric power supply system. Copies of this application will be made available, upon... DEPARTMENT OF ENERGY [OE Docket No. EA-383] Application To Export Electric Energy; Pilot Power... application. SUMMARY: Pilot Power Group, Inc. (Pilot Power) has applied for authority to transmit electric...

  12. 77 FR 50486 - Application To Export Electric Energy; TexMex Energy, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-21

    ... DEPARTMENT OF ENERGY [OE Docket No. EA-294-B] Application To Export Electric Energy; TexMex Energy, LLC AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of application. SUMMARY: TexMex Energy, LLC (TexMex) has applied to renew its authority to transmit electric energy from...

  13. Power-by-Wire Development and Demonstration for Subsonic Civil Transport

    NASA Technical Reports Server (NTRS)

    1996-01-01

    During the last decade, three significant studies by the Lockheed Martin Corporation, the NASA Lewis Research Center, and McDonnell Douglas Corporation have clearly shown operational, weight, and cost advantages for commercial subsonic transport aircraft that use all-electric or more-electric technologies in the secondary electric power systems. Even though these studies were completed on different aircraft, used different criteria, and applied a variety of technologies, all three have shown large benefits to the aircraft industry and to the nation's competitive position. The Power-by-Wire (PBW) program is part of the highly reliable Fly-By-Light/Power-By-Wire (FBL/PBW) Technology Program, whose goal is to develop the technology base for confident application of integrated FBL/PBW systems for transport aircraft. This program is part of the NASA aeronautics strategic thrust in subsonic aircraft/national airspace (Thrust 1) to "develop selected high-leverage technologies and explore new means to ensure the competitiveness of U.S. subsonic aircraft and to enhance the safety and productivity of the national aviation system" (The Aeronautics Strategic Plan). Specifically, this program is an initiative under Thrust 1, Key Objective 2, to "develop, in cooperation with U.S. industry, selected high-payoff technologies that can enable significant improvements in aircraft efficiency and cost."

  14. Integrating Variable Renewable Energy in Electric Power Markets: Best Practices from International Experience

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cochran, J.; Bird, L.; Heeter, J.

    Many countries -- reflecting very different geographies, markets, and power systems -- are successfully managing high levels of variable renewable energy on the electric grid, including that from wind and solar energy. This study documents the diverse approaches to effective integration of variable renewable energy among six countries -- Australia (South Australia), Denmark, Germany, Ireland, Spain, and the United States (Western region-Colorado and Texas)-- and summarizes policy best practices that energy ministers and other stakeholders can pursue to ensure that electricity markets and power systems can effectively coevolve with increasing penetrations of variable renewable energy. Each country has crafted itsmore » own combination of policies, market designs, and system operations to achieve the system reliability and flexibility needed to successfully integrate renewables. Notwithstanding this diversity, the approaches taken by the countries studied all coalesce around five strategic areas: lead public engagement, particularly for new transmission; coordinate and integrate planning; develop rules for market evolution that enable system flexibility; expand access to diverse resources and geographic footprint of operations; and improve system operations. The ability to maintain a broad ecosystem perspective, to organize and make available the wealth of experiences, and to ensure a clear path from analysis to enactment should be the primary focus going forward.« less

  15. Program evaluation in integrated resource planning

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Council, C.D.

    1994-12-31

    The Western Area Power Administration along with the Southwestern and Southeastern Power Administrations joined together to develop a set of integrated resource planning (IRP) tools to help their customers development and implement an IRP process. The project has been entitled the Resource Planning Guide (RPG), and is specifically designed to help small- to mid-sized utilities analyze supply- and demand-side alternatives as part of an IRP process. The RPG project will be available in January 1994 and will include such support as: workshops, technical assistance, an RPG hotline, and an RPG User`s Group for the project. The RPG grew out ofmore » the interest shown by utility customers who wanted a user-friendly tool to aid in their application of the IRP process. The project has been field tested by 43 utilities and related organizations over the last year, has sparked interest both nationally and internationally, and is now available for public use. The program evaluation aspects of the IRP process are heightened by a requirement of the Energy Policy Act of 1992 which requires all long-term power customers of the Western Area Power Administration to develop, implement, and monitor an IRP process. The EPAct defines IRP as: A planning process for new energy resources that evaluates the full range of alternatives, including new generating capacity, power purchases, energy conservation and efficiency, cogeneration and district heating and cooling applications, and renewable energy resources, to provide adequate and reliable service to its electric customers at the lowest system cost. The process takes into account necessary features for system operation, such as diversity, reliability, dispatchability, and other factors of risk; the ability to verify energy savings achieved through energy conservation and efficiency and the projected durability of such savings measured over time; and treats demand and supply resources on a consistent and integrated basis.« less

  16. Using Indium Tin Oxide To Mitigate Dust on Viewing Ports

    NASA Technical Reports Server (NTRS)

    2008-01-01

    NASA plans to use a number of onboard viewing ports to measure lunar regolith in situ and to monitor robotic and human activities on the lunar or Martian surface. Because of the size and abundance of dust particles on these bodies, the potential for dust to occlude viewing ports and windows is high enough to threaten system lifetime and reliability, especially when activities rely on relaying video to either a habitat module or controllers on Earth. This project uses a technology being developed by KSC's Electrostatics and Surface Physics Laboratory to remove dust from windowlike surfaces. The technology applies an alternating electric potential to interlaced electrodes. In this application, we use indium tin oxide (ITO) to create various electrode patterns in order to determine the most reliable pattern for dust removal. This technology has application to systems where optical clarity is important. Specifically, this project considers the in situ resource utilization (ISRU) application of a viewing port for Raman spectroscopy, where the electrode pattern on glass would be coated with a scratch-resistant sapphire film (Al2O3).

  17. 100% Clean, Renewable Wind, Water, and Solar Roadmaps for 139 Countries of the World

    NASA Astrophysics Data System (ADS)

    Jacobson, M. Z.

    2015-12-01

    Significant prior research has focused on the health, climate, and other environmental and social impacts of gas and aerosol particle emissions from fossil fuel and biofuel combustion. Given the magnitude and costs of the impacts, large-scale conversions of these fuels to non-emitting sources of energy are warranted. This talk discusses technical and economic roadmaps to convert the energy infrastructures of each of 139 countries of the world to those powered by 100% non-emitting wind, water, and sunlight (WWS) for all purposes, namely electricity, transportation, heating/cooling, industry, and agriculture/forestry/fishing, after energy efficiency measures have been accounted for. These roadmaps are developed with a methodology similar to that recently derived for each of the 50 United States. Reliability of 100% WWS systems is crucial. To that end, results showing the ability of the United States to maintain a 100% reliable grid with a 100% WWS system are discussed as well. Please see http://web.stanford.edu/group/efmh/jacobson/Articles/I/WWS-50-USState-plans.html for more information.

  18. Demonstration of Essential Reliability Services by a 300-MW Solar Photovoltaic Power Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Loutan, Clyde; Klauer, Peter; Chowdhury, Sirajul

    The California Independent System Operator (CAISO), First Solar, and the National Renewable Energy Laboratory (NREL) conducted a demonstration project on a large utility-scale photovoltaic (PV) power plant in California to test its ability to provide essential ancillary services to the electric grid. With increasing shares of solar- and wind-generated energy on the electric grid, traditional generation resources equipped with automatic governor control (AGC) and automatic voltage regulation controls -- specifically, fossil thermal -- are being displaced. The deployment of utility-scale, grid-friendly PV power plants that incorporate advanced capabilities to support grid stability and reliability is essential for the large-scale integrationmore » of PV generation into the electric power grid, among other technical requirements. A typical PV power plant consists of multiple power electronic inverters and can contribute to grid stability and reliability through sophisticated 'grid-friendly' controls. In this way, PV power plants can be used to mitigate the impact of variability on the grid, a role typically reserved for conventional generators. In August 2016, testing was completed on First Solar's 300-MW PV power plant, and a large amount of test data was produced and analyzed that demonstrates the ability of PV power plants to use grid-friendly controls to provide essential reliability services. These data showed how the development of advanced power controls can enable PV to become a provider of a wide range of grid services, including spinning reserves, load following, voltage support, ramping, frequency response, variability smoothing, and frequency regulation to power quality. Specifically, the tests conducted included various forms of active power control such as AGC and frequency regulation; droop response; and reactive power, voltage, and power factor controls. This project demonstrated that advanced power electronics and solar generation can be controlled to contribute to system-wide reliability. It was shown that the First Solar plant can provide essential reliability services related to different forms of active and reactive power controls, including plant participation in AGC, primary frequency control, ramp rate control, and voltage regulation. For AGC participation in particular, by comparing the PV plant testing results to the typical performance of individual conventional technologies, we showed that regulation accuracy by the PV plant is 24-30 points better than fast gas turbine technologies. The plant's ability to provide volt-ampere reactive control during periods of extremely low power generation was demonstrated as well. The project team developed a pioneering demonstration concept and test plan to show how various types of active and reactive power controls can leverage PV generation's value from being a simple variable energy resource to a resource that provides a wide range of ancillary services. With this project's approach to a holistic demonstration on an actual, large, utility-scale, operational PV power plant and dissemination of the obtained results, the team sought to close some gaps in perspectives that exist among various stakeholders in California and nationwide by providing real test data.« less

  19. 46 CFR 169.619 - Reliability.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Reliability. 169.619 Section 169.619 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical Steering Systems § 169.619 Reliability. (a) Except where the OCMI judges it impracticable, the...

  20. 46 CFR 169.619 - Reliability.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Reliability. 169.619 Section 169.619 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical Steering Systems § 169.619 Reliability. (a) Except where the OCMI judges it impracticable, the...

  1. 75 FR 80391 - Electric Reliability Organization Interpretations of Interconnection Reliability Operations and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-22

    ... configuration to maintain system stability, acceptable voltage or power flows.\\12\\ \\12\\ In the Western... prevent system instability or cascading outages, and protect other facilities in response to transmission... nature used to address system reliability vulnerabilities to prevent system instability, cascading...

  2. Effect of knee angle on neuromuscular assessment of plantar flexor muscles: A reliability study

    PubMed Central

    Cornu, Christophe; Jubeau, Marc

    2018-01-01

    Introduction This study aimed to determine the intra- and inter-session reliability of neuromuscular assessment of plantar flexor (PF) muscles at three knee angles. Methods Twelve young adults were tested for three knee angles (90°, 30° and 0°) and at three time points separated by 1 hour (intra-session) and 7 days (inter-session). Electrical (H reflex, M wave) and mechanical (evoked and maximal voluntary torque, activation level) parameters were measured on the PF muscles. Intraclass correlation coefficients (ICC) and coefficients of variation were calculated to determine intra- and inter-session reliability. Results The mechanical measurements presented excellent (ICC>0.75) intra- and inter-session reliabilities regardless of the knee angle considered. The reliability of electrical measurements was better for the 90° knee angle compared to the 0° and 30° angles. Conclusions Changes in the knee angle may influence the reliability of neuromuscular assessments, which indicates the importance of considering the knee angle to collect consistent outcomes on the PF muscles. PMID:29596480

  3. Between-day reliability of the trapezius muscle H-reflex and M-wave.

    PubMed

    Vangsgaard, Steffen; Hansen, Ernst A; Madeleine, Pascal

    2015-12-01

    The aim of this study was to investigate the between-day reliability of the trapezius muscle H-reflex and M-wave. Sixteen healthy subjects were studied on 2 consecutive days. Trapezius muscle H-reflexes were evoked by electrical stimulation of the C3/4 cervical nerves; M-waves were evoked by electrical stimulation of the accessory nerve. Relative reliability was estimated by intraclass correlation coefficients (ICC2,1 ). Absolute reliability was estimated by computing the standard error of measurement (SEM) and the smallest real difference (SRD). Bland-Altman plots were constructed to detect any systematic bias. Variables showed substantial to excellent relative reliability (ICC = 0.70-0.99). The relative SEM ranged from 1.4% to 34.8%; relative SRD ranged from 3.8% to 96.5%. No systematic bias was present in the data. The amplitude and latency of the trapezius muscle H-reflex and M-wave in healthy young subjects can be measured reliably across days. © 2015 Wiley Periodicals, Inc.

  4. Going "Netless"

    ERIC Educational Resources Information Center

    Taylor, Elien

    2005-01-01

    The reliability on technology through the use of electricity is discussed. However, one should be cautious to regain information if the electricity goes off, and must have efficient methods of information retrieval.

  5. 9 CFR 3.50 - Facilities, general.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... WELFARE STANDARDS Specifications for the Humane Handling, Care, Treatment and Transportation of Rabbits...) Water and electric power. Reliable and adequate electric power, if required to comply with other...

  6. 9 CFR 3.50 - Facilities, general.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... WELFARE STANDARDS Specifications for the Humane Handling, Care, Treatment and Transportation of Rabbits...) Water and electric power. Reliable and adequate electric power, if required to comply with other...

  7. 9 CFR 3.50 - Facilities, general.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... WELFARE STANDARDS Specifications for the Humane Handling, Care, Treatment and Transportation of Rabbits...) Water and electric power. Reliable and adequate electric power, if required to comply with other...

  8. Modeling and Analysis of Commercial Building Electrical Loads for Demand Side Management

    NASA Astrophysics Data System (ADS)

    Berardino, Jonathan

    In recent years there has been a push in the electric power industry for more customer involvement in the electricity markets. Traditionally the end user has played a passive role in the planning and operation of the power grid. However, many energy markets have begun opening up opportunities to consumers who wish to commit a certain amount of their electrical load under various demand side management programs. The potential benefits of more demand participation include reduced operating costs and new revenue opportunities for the consumer, as well as more reliable and secure operations for the utilities. The management of these load resources creates challenges and opportunities to the end user that were not present in previous market structures. This work examines the behavior of commercial-type building electrical loads and their capacity for supporting demand side management actions. This work is motivated by the need for accurate and dynamic tools to aid in the advancement of demand side operations. A dynamic load model is proposed for capturing the response of controllable building loads. Building-specific load forecasting techniques are developed, with particular focus paid to the integration of building management system (BMS) information. These approaches are tested using Drexel University building data. The application of building-specific load forecasts and dynamic load modeling to the optimal scheduling of multi-building systems in the energy market is proposed. Sources of potential load uncertainty are introduced in the proposed energy management problem formulation in order to investigate the impact on the resulting load schedule.

  9. American lifelines alliance efforts to improve electric power transmission reliability

    USGS Publications Warehouse

    Nishenko, S.P.; Savage, W.U.; Honegger, D.G.; McLane, T.R.; ,

    2002-01-01

    A study was performed on American Lifelines Alliance (ALA) efforts to improve electric power transmission reliability. ALA is a public-private partnership project, with the goal of reducing risks to lifelines from natural hazards and human threat events. The mechanism used by ALA for developing national guidelines for lifeline systems is dependent upon using existing Standards Developing Organizations (SDO) accredited by the American National Standards Institute (ANSI) as means to achieve national consensus.

  10. A high voltage electrical power system for low Earth orbit applications

    NASA Technical Reports Server (NTRS)

    Lanier, J. R., Jr.; Bush, J. R., Jr.

    1984-01-01

    The results of testing a high voltage electrical power system (EPS) breadboard using high voltage power processing equipment developed at Marshall Space Flight Center and Ni-Cd batteries are discussed. These test results are used to extrapolate to an efficient, reliable, high capacity EPS for near term low Earth orbit, high power applications. EPS efficiencies, figures of merit, and battery reliability with a battery protection and reconditioning circuit are presented.

  11. The welfare effects of integrating renewable energy into electricity markets

    NASA Astrophysics Data System (ADS)

    Lamadrid, Alberto J.

    The challenges of deploying more renewable energy sources on an electric grid are caused largely by their inherent variability. In this context, energy storage can help make the electric delivery system more reliable by mitigating this variability. This thesis analyzes a series of models for procuring electricity and ancillary services for both individuals and social planners with high penetrations of stochastic wind energy. The results obtained for an individual decision maker using stochastic optimization are ambiguous, with closed form solutions dependent on technological parameters, and no consideration of the system reliability. The social planner models correctly reflect the effect of system reliability, and in the case of a Stochastic, Security Constrained Optimal Power Flow (S-SC-OPF or SuperOPF), determine reserve capacity endogenously so that system reliability is maintained. A single-period SuperOPF shows that including ramping costs in the objective function leads to more wind spilling and increased capacity requirements for reliability. However, this model does not reflect the inter temporal tradeoffs of using Energy Storage Systems (ESS) to improve reliability and mitigate wind variability. The results with the multiperiod SuperOPF determine the optimum use of storage for a typical day, and compare the effects of collocating ESS at wind sites with the same amount of storage (deferrable demand) located at demand centers. The collocated ESS has slightly lower operating costs and spills less wind generation compared to deferrable demand, but the total amount of conventional generating capacity needed for system adequacy is higher. In terms of the total system costs, that include the capital cost of conventional generating capacity, the costs with deferrable demand is substantially lower because the daily demand profile is flattened and less conventional generation capacity is then needed for reliability purposes. The analysis also demonstrates that the optimum daily pattern of dispatch and reserves is seriously distorted if the stochastic characteristics of wind generation are ignored.

  12. Optimal Wind Energy Integration in Large-Scale Electric Grids

    NASA Astrophysics Data System (ADS)

    Albaijat, Mohammad H.

    The major concern in electric grid operation is operating under the most economical and reliable fashion to ensure affordability and continuity of electricity supply. This dissertation investigates the effects of such challenges, which affect electric grid reliability and economic operations. These challenges are: 1. Congestion of transmission lines, 2. Transmission lines expansion, 3. Large-scale wind energy integration, and 4. Phaser Measurement Units (PMUs) optimal placement for highest electric grid observability. Performing congestion analysis aids in evaluating the required increase of transmission line capacity in electric grids. However, it is necessary to evaluate expansion of transmission line capacity on methods to ensure optimal electric grid operation. Therefore, the expansion of transmission line capacity must enable grid operators to provide low-cost electricity while maintaining reliable operation of the electric grid. Because congestion affects the reliability of delivering power and increases its cost, the congestion analysis in electric grid networks is an important subject. Consequently, next-generation electric grids require novel methodologies for studying and managing congestion in electric grids. We suggest a novel method of long-term congestion management in large-scale electric grids. Owing to the complication and size of transmission line systems and the competitive nature of current grid operation, it is important for electric grid operators to determine how many transmission lines capacity to add. Traditional questions requiring answers are "Where" to add, "How much of transmission line capacity" to add, and "Which voltage level". Because of electric grid deregulation, transmission lines expansion is more complicated as it is now open to investors, whose main interest is to generate revenue, to build new transmission lines. Adding a new transmission capacity will help the system to relieve the transmission system congestion, create profit for investors for renting their transmission capacity, and cheaper electricity for end users. We propose a hybrid method based on a heuristic and deterministic method to attain new transmission lines additions and increase transmission capacity. Renewable energy resources (RES) have zero operating cost, which makes them very attractive for generation companies and market participants. In addition, RES have zero carbon emission, which helps relieve the concerns of environmental impacts of electric generation resources' carbon emission. RES are wind, solar, hydro, biomass, and geothermal. By 2030, the expectation is that more than 30% of electricity in the U.S. will come from RES. One major contributor of RES generation will be from wind energy resources (WES). Furthermore, WES will be an important component of the future generation portfolio. However, the nature of WES is that it experiences a high intermittency and volatility. Because of the great expectation of high WES penetration and the nature of such resources, researchers focus on studying the effects of such resources on the electric grid operation and its adequacy from different aspects. Additionally, current market operations of electric grids add another complication to consider while integrating RES (e.g., specifically WES). Mandates by market rules and long-term analysis of renewable penetration in large-scale electric grid are also the focus of researchers in recent years. We advocate a method for high-wind resources penetration study on large-scale electric grid operations. PMU is a geographical positioning system (GPS) based device, which provides immediate and precise measurements of voltage angle in a high-voltage transmission system. PMUs can update the status of a transmission line and related measurements (e.g., voltage magnitude and voltage phase angle) more frequently. Every second, a PMU can provide 30 samples of measurements compared to traditional systems (e.g., supervisory control and data acquisition [SCADA] system), which provides one sample of measurement every 2 to 5 seconds. Because PMUs provide more measurement data samples, PMU can improve electric grid reliability and observability. (Abstract shortened by UMI.)

  13. 75 FR 72909 - Revision to Electric Reliability Organization Definition of Bulk Electric System

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-26

    ...) Comments 135 (b) Commission Determination 139 6. Impact on Generation Owners and Operators 142 (a) Comments... Organization, the electrical generation resources, transmission lines, interconnections with neighboring... above that interconnect with registered generation facilities are excluded from NPCC's list of bulk...

  14. Fuel Cells Provide Reliable Power to U.S. Postal Service Facility in Anchorage, Alaska

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Parker, Steven

    2003-01-01

    Working together, the U.S. Postal Service (USPS) and Chugach Electric Association, partnering with the Department of Defense (DOD), Department of Energy (DOE), US Army Corps of Engineers Construction Engineering Research Laboratories (USA CERL), Electric Power Research Institute (EPRI), and National Rural Electric Cooperative Association (NRECA), developed and installed one of the largest fuel cell installations in the world. The one-megawatt fuel cell combined heat and power plant sits behind the Anchorage U.S. Postal Service Mail Processing and Distribution Facility. Chugach Electric owns, operates, and maintains the fuel cell power plant, which provides clean, reliable power to the USPS facility. Inmore » addition, heat recovered from the fuel cells, in the form of hot water, is used to heat the USPS Mail Processing and Distribution Facility. By taking a leadership role, the USPS will save over $800,000 in electricity and natural gas costs over the 5 1/2-year contract term with Chugach Electric.« less

  15. Jobsite Supervisor Instructor's Manual for Electrical Apprentice Technical Training. Revised to Meet 1978 Electrical Code.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Community Colleges, Raleigh.

    One hundred and sixteen lesson plans for a first, second, third and fourth year electrical apprentice technical training program are presented in this manual. The lesson plans are generally organized into four steps: introducing the lesson, presenting the lessons (e.g., demonstration), student application (use of worksheets), and checking and…

  16. The effect of the NERC CIP standards on the reliability of the North American Bulk Electric System

    DOE PAGES

    Ladendorff, Marlene Z.

    2016-06-01

    Considerable money and effort has been expended by generation, transmission, and distribution entities in North America to implement the North American Electric Reliability Corporation (NERC) Critical Infrastructure Protection (CIP) standards for the bulk electric system. Assumptions have been made that as a result of the implementation of the standards, the grid is more cyber secure than it was pre-NERC CIP, but are there data supporting these claims, or only speculation? Has the implementation of the standards had an effect on the grid? Furthermore, developing a research study to address these and other questions provided surprising results.

  17. Sandia and NJ TRANSIT Authority Developing Resilient Power Grid

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hanley, Charles J.; Ellis, Abraham

    2014-11-01

    Through the memorandum of understanding between the Depratment of Energy (DOE), the New Jersey Transit Authority (NJ Transit), and the New Jersey Board of Public Utilities, Sandia National Labs is assisting NJ Transit in developing NJ TransitGrid: an electric microgrid that will include a large-scale gas-fired generation facility and distributed energy resources (photovoltaics [PV], energy storage, electric vehicles, combined heat and power [CHP]) to supply reliable power during storms or other times of significant power failure. The NJ TransitGrid was awarded $410M from the Department of Transportation to develop a first-of-its-kind electric microgrid capable of supplying highly-reliable power.

  18. Apples to Apples: Equivalent-Reliability Power Systems Across Diverse Resource Mix Scenarios

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stephen, Gordon W; Frew, Bethany A; Sigler, Devon

    Electricity market research is highly price sensitive, and prices are strongly influenced by balance of supply and demand. This work looks at how to combine capacity expansion models and reliability assessment tools to assess equivalent-reliability power systems across diverse resource mix scenarios.

  19. 14 CFR 171.29 - Installation requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., applicable electric and safety codes, and FCC licensing requirements. (b) The facility must have a reliable... be the ground-air communications required by paragraph (d)(1) of this section and reliable... paragraphs (d) (1) and (2) of this section may be reduced to reliable communications (at least a landline...

  20. 14 CFR 171.29 - Installation requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., applicable electric and safety codes, and FCC licensing requirements. (b) The facility must have a reliable... be the ground-air communications required by paragraph (d)(1) of this section and reliable... paragraphs (d) (1) and (2) of this section may be reduced to reliable communications (at least a landline...

  1. 77 FR 2963 - Commission Information Collection Activities (FERC-725F); Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-20

    ... submitting the information collection FERC-725F, ``Mandatory Reliability Standards for Nuclear Plant...: Title: FERC-725F Mandatory Reliability Standards for Nuclear Plant Interface Coordination OMB Control No... added a new section 215 to the FPA, which required a Commission-certified Electric Reliability...

  2. 75 FR 30008 - Commission Information Collection Activities; Comment Request; Extension

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-28

    ... by requiring public utilities, working through the North American Electric Reliability Corporation.... The Commission required a NERC/NAESB \\2\\ team to draft and review Order No. 890 reliability standards... NERC, were to revise reliability standards to require the exchange of data and coordination among...

  3. 76 FR 67158 - Commission Information Collection Activities (FERC-725F); Comment Request; Extension

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ..., ``Mandatory Reliability Standard for Nuclear Plant Interface Coordination'' (OMB Control No. 1902-0249), is... 215 to the FPA, which required a Commission-certified Electric Reliability Organization (ERO) to develop mandatory and enforceable Reliability Standards, which are subject to Commission review and...

  4. The transmission system as main actor in electricity market development in Romania

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Petrescu, A.M.; Mihailescu, F.

    1998-07-01

    At the beginning of 1998, Romanian Electricity Authority (RENEL) was a fully integrated generation, transmission and distribution company, which managed all aspects of planning, design, and operation of Romania' s electricity sector. This form of vertically integrated organization has enabled to develop the high voltage transmission system in order to transfer electricity from the large power plants on indigenous coal (lignite) to the deficit electricity areas. An analysis based on specific characteristics of Romanian Transmission System allows the identification of a suitable model cost for transmission services evaluation. The transmission electricity tariff as a market tool has become a necessitymore » for the heterogeneous Romanian power systems from the repartition of the generation against the demand location point of view. The experience of the power system development planner shows that the most suitable model for the transmission electricity system cost assessment is the rated zones in order to reflect the geographical imbalance of generation and demand and the ability of the transmission system to accommodate this imbalance. Setting principles for the cost evaluation has to be sustained by the service evaluation on the grid nodes at the interface between transmission system and distribution system. This cost evaluation under the form of incentives for new producers has to be reconsidered year by year taking into account the evolution in time both production side and demand side. The incentives have to be addressed directly to the producers and must be strong enough to provide an efficient reliable operation of the whole power system. Transmission planners have to develop new approaches to deal with the uncertainties of the market; a combination of market forces and regulation seems to ensure the best way for the quality and security of the power system beside of the efficiency of all actors from the electricity market.« less

  5. Project Fever - Fostering Electric Vehicle Expansion in the Rockies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Swalnick, Natalia

    2013-06-30

    Project FEVER (Fostering Electric Vehicle Expansion in the Rockies) is a part of the Clean Cities Community Readiness and Planning for Plug-in Electric Vehicles and Charging Infrastructure Funding Opportunity funded by the U.S. Department of Energy (DOE) for the state of Colorado. Tasks undertaken in this project include: Electric Vehicle Grid Impact Assessment; Assessment of Electrical Permitting and Inspection for EV/EVSE (electric vehicle/electric vehicle supply equipment); Assessment of Local Ordinances Pertaining to Installation of Publicly Available EVSE;Assessment of Building Codes for EVSE; EV Demand and Energy/Air Quality Impacts Assessment; State and Local Policy Assessment; EV Grid Impact Minimization Efforts; Unificationmore » and Streamlining of Electrical Permitting and Inspection for EV/EVSE; Development of BMP for Local EVSE Ordinances; Development of BMP for Building Codes Pertaining to EVSE; Development of Colorado-Specific Assessment for EV/EVSE Energy/Air Quality Impacts; Development of State and Local Policy Best Practices; Create Final EV/EVSE Readiness Plan; Develop Project Marketing and Communications Elements; Plan and Schedule In-person Education and Outreach Opportunities.« less

  6. Precision measurement of electric organ discharge timing from freely moving weakly electric fish.

    PubMed

    Jun, James J; Longtin, André; Maler, Leonard

    2012-04-01

    Physiological measurements from an unrestrained, untethered, and freely moving animal permit analyses of neural states correlated to naturalistic behaviors of interest. Precise and reliable remote measurements remain technically challenging due to animal movement, which perturbs the relative geometries between the animal and sensors. Pulse-type electric fish generate a train of discrete and stereotyped electric organ discharges (EOD) to sense their surroundings actively, and rapid modulation of the discharge rate occurs while free swimming in Gymnotus sp. The modulation of EOD rates is a useful indicator of the fish's central state such as resting, alertness, and learning associated with exploration. However, the EOD pulse waveforms remotely observed at a pair of dipole electrodes continuously vary as the fish swims relative to the electrodes, which biases the judgment of the actual pulse timing. To measure the EOD pulse timing more accurately, reliably, and noninvasively from a free-swimming fish, we propose a novel method based on the principles of waveform reshaping and spatial averaging. Our method is implemented using envelope extraction and multichannel summation, which is more precise and reliable compared with other widely used threshold- or peak-based methods according to the tests performed under various source-detector geometries. Using the same method, we constructed a real-time electronic pulse detector performing an additional online pulse discrimination routine to enhance further the detection reliability. Our stand-alone pulse detector performed with high temporal precision (<10 μs) and reliability (error <1 per 10(6) pulses) and permits longer recording duration by storing only event time stamps (4 bytes/pulse).

  7. 78 FR 63036 - Transmission Planning Reliability Standards

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-23

    ... blend of specific quantitative and qualitative parameters for the permissible use of planned non... circumstances, Reliability Standard TPL-001-4 provides a blend of specific quantitative and qualitative... considerations, such as costs and alternatives, guards against a determination based solely on a quantitative...

  8. Reliability techniques in the petroleum industry

    NASA Technical Reports Server (NTRS)

    Williams, H. L.

    1971-01-01

    Quantitative reliability evaluation methods used in the Apollo Spacecraft Program are translated into petroleum industry requirements with emphasis on offsetting reliability demonstration costs and limited production runs. Described are the qualitative disciplines applicable, the definitions and criteria that accompany the disciplines, and the generic application of these disciplines to the chemical industry. The disciplines are then translated into proposed definitions and criteria for the industry, into a base-line reliability plan that includes these disciplines, and into application notes to aid in adapting the base-line plan to a specific operation.

  9. Design of fuel cell powered data centers for sufficient reliability and availability

    NASA Astrophysics Data System (ADS)

    Ritchie, Alexa J.; Brouwer, Jacob

    2018-04-01

    It is challenging to design a sufficiently reliable fuel cell electrical system for use in data centers, which require 99.9999% uptime. Such a system could lower emissions and increase data center efficiency, but the reliability and availability of such a system must be analyzed and understood. Currently, extensive backup equipment is used to ensure electricity availability. The proposed design alternative uses multiple fuel cell systems each supporting a small number of servers to eliminate backup power equipment provided the fuel cell design has sufficient reliability and availability. Potential system designs are explored for the entire data center and for individual fuel cells. Reliability block diagram analysis of the fuel cell systems was accomplished to understand the reliability of the systems without repair or redundant technologies. From this analysis, it was apparent that redundant components would be necessary. A program was written in MATLAB to show that the desired system reliability could be achieved by a combination of parallel components, regardless of the number of additional components needed. Having shown that the desired reliability was achievable through some combination of components, a dynamic programming analysis was undertaken to assess the ideal allocation of parallel components.

  10. Inverter Load Rejection Over-Voltage Testing: SolarCity CRADA Task 1a Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nelson, A.; Hoke, A.; Chakraborty, S.

    Various interconnection challenges exist when connecting distributed PV into the electrical distribution grid in terms of safety, reliability, and stability of electric power systems. One of the urgent areas for additional research - as identified by inverter manufacturers, installers, and utilities - is the potential for transient over-voltage from PV inverters. In one stage of a cooperative tests were repeated a total of seven times. The maximum over-voltage measured in any test did not exceed 200% of nominal, and typical over-voltage levels were significantly lower. The total voltage duration and the maximum continuous time above each threshold are presented here,more » as well as the time to disconnect for each test. Finally, we present a brief investigation into the effect of DC input voltage as well as a series of no-load tests. This report describes testing conducted at NREL to determine the duration and magnitude of transient over-voltages created by several commercial PV inverters during load-rejection conditions. For this work, a test plan that is currently under development by the Forum on Inverter Grid Integration Issues (FIGII) has been implemented in a custom test setup at NREL. Through a cooperative research and development agreement, NREL is working with SolarCity to address two specific types of transient overvoltage: load rejection overvoltage (LRO) and ground fault overvoltage (GFO). Additional partners in this effort include the Hawaiian Electric Companies, Northern Plains Power Technologies, and the Electric Power Research Institute.« less

  11. 7 CFR 1730.21 - Inspections and tests.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... reliability and security of the electric power grid, cause significant risk to the safety and health of the... AGRICULTURE ELECTRIC SYSTEM OPERATIONS AND MAINTENANCE Operations and Maintenance Requirements § 1730.21... parts of its electric system, annually exercise its ERP, and maintain records of such inspections and...

  12. 75 FR 12737 - Applications To Export Electric Energy; Noble Energy Marketing and Trade Corp.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-17

    ...; Noble Energy Marketing and Trade Corp. AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of application. SUMMARY: Under two separate applications, Noble Energy Marketing... power marketing agencies, and other entities within the United States. NEMT has requested electricity...

  13. 78 FR 65978 - Application to Export Electric Energy; Brookfield Energy Marketing Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-04

    ... DEPARTMENT OF ENERGY [OE Docket No. EA-258-D] Application to Export Electric Energy; Brookfield Energy Marketing Inc. AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of application. SUMMARY: Brookfield Energy Marketing Inc. (BEMI) has applied to renew its authority...

  14. 75 FR 57912 - Application To Export Electric Energy; Rainbow Energy Marketing Corporation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-23

    ... DEPARTMENT OF ENERGY [OE Docket No. EA-375] Application To Export Electric Energy; Rainbow Energy Marketing Corporation AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of application. SUMMARY: Rainbow Energy Marketing Corporation (Rainbow) has applied for authority to transmit...

  15. 78 FR 38851 - Electric Reliability Organization Proposal To Retire Requirements in Reliability Standards

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-28

    ... 215 of the Federal Power Act, the Commission proposes to approve the retirement of 34 requirements... of the Reliability Standards. In addition, the Commission proposes to withdraw 41 outstanding...-Power System. This proposal is part of the Commission's ongoing effort to review its requirements and...

  16. 76 FR 23801 - North American Electric Reliability Corporation; Order Approving Reliability Standard

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-28

    ... primary control functionality. Nonetheless, until data from drills, exercises and tests can support a... control center becomes inoperable and to conduct reviews and tests, at least annually, to ensure viability... Preparedness and Operations (EOP) Reliability Standard EOP- 008-1 (Loss of Control Center Functionality). The...

  17. 75 FR 51027 - Commission Information Collection Activities (FERC-917 and FERC-918) 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-18

    ... public utilities, working through the North American Electric Reliability Corporation (NERC), to develop... required a NERC/NAESB \\3\\ team to draft and review Order No. 890 reliability standards and business... revise reliability standards to require the exchange of data and coordination among transmission...

  18. 76 FR 18209 - Commission Information Collection Activities (FERC-725D); Comment Request; Submitted for OMB Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-01

    ... by the FERC-725D, ``Facilities Design, Connections and Maintenance Reliability Standards'' (OMB... 2005 added a new section 215 to the FPA, which required a Commission-certified Electric Reliability Organization (ERO) to develop mandatory and enforceable reliability standards, which are subject to Commission...

  19. Electricity-Electronics for Industrial Arts. Instructors Lesson Plans. Industrial Arts Series, Publication Number 10,010.

    ERIC Educational Resources Information Center

    Hinrichs, Roy S., Comp.

    Thirty-one lesson plans on electricity-electronics are presented in this guide designed for industrial arts instructors. Each lesson plan is organized into the following format: (1) lesson objective; (2) supplementary teaching items; (3) presentation; (4) demonstration; (5) laboratory or other activities; and (6) test items (oral, written, or…

  20. 142. ARAIII General plan of GCRE area, including electrical distribution ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    142. ARA-III General plan of GCRE area, including electrical distribution plan for power and lighting. Includes detail of floodlight and security lighting poles and fixtures. Aerojet-general 880-area/GCRE-406-1. Date: February 1958. Ineel index code no. 063-0406-00-013-102539. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID

  1. Minimum Check List for Mechanical and Electrical Plans & Specifications.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Public Instruction, Raleigh. Div. of School Facility Services.

    This is the fifth revision of the Minimum Check List since its origin in 1960 by North Carolina's School Planning. The checklist was developed to serve as a means of communication between school agencies and design professionals and has been widely used in the development and review of mechanical and electrical plans and specifications by…

  2. Development of a Compact Efficient Cooling Pump for Space Suit Life Support Systems

    NASA Technical Reports Server (NTRS)

    vanBoeyen, Roger W.; Reeh, Jonathan A.; Trevino, Luis

    2008-01-01

    With the increasing demands placed on extravehicular activity (EVA) for the International Space Station (ISS) assembly and maintenance, along with planned lunar and Martian missions, the need for increased human productivity and capability becomes ever more critical. This is most readily achieved by reduction in space suit weight and volume, and increased hardware reliability, durability, and operating lifetime. Considerable progress has been made with each successive generation of space suit design; from the Apollo A7L suit, to the current Shuttle Extravehicular Mobile Unit (EMU) suit, and the next generation Constellation Space Suit Element (CSSE). However, one area of space suit design which has continued to lag is the fluid pump used to drive the water cooling loop of the Primary Life Support System (PLSS). The two main types of fluid pumps typically used in space applications are rotodynamic pumps (pumping is achieved through a rotary vaned impeller) and displacement pumps (which includes rotary and diaphragm pumps). The rotating and moving parts found in the pumps and electric motor add significantly to the susceptibility to wear and friction, thermal mismatch, and complexity of the pumps. Electric motor-driven pumps capable of achieving high operational reliability are necessarily large, heavy, and energy inefficient. This report describes a development effort conducted for NASA by Lynntech, Inc., who recently demonstrated the feasibility of an electrochemically-driven fluid cooling pump. With no electric motor and minimal lightweight components, an electrochemically-driven pump is expected to be significantly smaller, lighter and achieve a longer life time than conventional rotodynamic and displacement pumps. By employing sulfonated polystyrene-based proton exchange membranes, rather than conventional Nafion membranes, a significant reduction in the actuator power consumption was demonstrated. It was also demonstrated that these membranes possess the necessary mechanical strength, durability, and temperature range for long life space operation. The preliminary design for a Phase II prototype pump compares very favorably to the fluid cooling pumps currently used in space suit portable life support systems (PLSS). Characteristics of the electrochemically-driven pump are described and the benefits of the technology as a replacement for electric motor pumps in mechanically pumped single-phase fluid loops (MPFLs) is discussed.

  3. Light Water Reactor Sustainability Program: Integrated Program Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 60%) of non-greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to grow by about 24% from 2013 to 2040 . At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license, for a total of 60 years of operation (the oldest commercial plants in the Unitedmore » States reached their 40th anniversary in 2009). Figure E-1 shows projected nuclear energy contribution to the domestic generating capacity for 40- and 60-year license periods. If current operating nuclear power plants do not operate beyond 60 years (and new nuclear plants are not built quickly enough to replace them), the total fraction of generated electrical energy from nuclear power will rapidly decline. That decline will be accelerated if plants are shut down before 60 years of operation. Decisions on extended operation ultimately rely on economic factors; however, economics can often be improved through technical advancements. The U.S. Department of Energy Office of Nuclear Energy’s 2010 Research and Development Roadmap (2010 Nuclear Energy Roadmap) organizes its activities around four objectives that ensure nuclear energy remains a compelling and viable energy option for the United States. The four objectives are as follows: 1. Develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors; 2. Develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration’s energy security and climate change goals; 3. Develop sustainable nuclear fuel cycles; and 4. Understand and minimize the risks of nuclear proliferation and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program’s plans. For the LWRS Program, sustainability is defined as the ability to maintain safe and economic operation of the existing fleet of nuclear power plants for a longer-than-initially-licensed lifetime. It has two facets with respect to long-term operations: (1) manage the aging of plant systems, structures, and components so that nuclear power plant lifetimes can be extended and the plants can continue to operate safely, efficiently, and economically; and (2) provide science-based solutions to the industry to implement technology to exceed the performance of the current labor-intensive business model.« less

  4. Instructor's Manual for Electrical Apprentice Technical Training. Series No. D (Fourth Year). Revised to Meet 1978 Electrical Code.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Community Colleges, Raleigh.

    Twenty-seven lesson plans for a fourth-year electrical apprentice technical training program are presented in this instructor's manual. Also included are student worksheets and information sheets for each lesson, and copies of unit tests. (Answers to the worksheets and tests are provided.) The lesson plans are generally organized into four steps:…

  5. Instructor's Manual for Electrical Apprentice Technical Training. Series No. A (First Year). Revised to Meet 1978 Electrical Code.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Community Colleges, Raleigh.

    Thirty-six lesson plans for the first of a four-year electrical apprentice technical training program are presented in this instructor's manual. Also included are student worksheets and information sheets for each lesson, and copies of unit tests. (Answers to the worksheets and tests are provided.) The lesson plans are generally organized into…

  6. Instructor's Manual for Electrical Apprentice Technical Training. Series No. B (Second Year). Revised to Meet 1978 Electrical Code.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Community Colleges, Raleigh.

    Twenty-eight lesson plans for the second year of a four-year electrical apprentice technical training program are presented in this instructor's manual. Also included are student worksheets and information sheets for each lesson, and copies of unit tests. (Answers to the worksheets and tests are provided.) The lesson plans are generally organized…

  7. A guide to onboard checkout. Volume 3: Electrical power

    NASA Technical Reports Server (NTRS)

    1971-01-01

    The baseline electrical power subsystem for a space station is considered. The subsystem was anlayzed in order to define onboard checkout requirements. Reliability, failure effects, and maintenance are discussed.

  8. Transportation planning for electric vehicles and associated infrastructure.

    DOT National Transportation Integrated Search

    2017-05-01

    Planning is the key to successful adoption and deployment of any new technology, and : it is particularly important when that advancement involves a paradigm shift such as : electrified transportation. At its core, electric transportation is largely ...

  9. Optical Amplifier Based Space Solar Power

    NASA Technical Reports Server (NTRS)

    Fork, Richard L.

    2001-01-01

    The objective was to design a safe optical power beaming system for use in space. Research was focused on identification of strategies and structures that would enable achievement near diffraction limited optical beam quality, highly efficient electrical to optical conversion, and high average power in combination in a single system. Efforts centered on producing high efficiency, low mass of the overall system, low operating temperature, precision pointing and tracking capability, compatibility with useful satellite orbits, component and system reliability, and long component and system life in space. A system based on increasing the power handled by each individual module to an optimum and the number of modules in the complete structure was planned. We were concerned with identifying the most economical and rapid path to commercially viable safe space solar power.

  10. Climate and Water Vulnerability of the US Electricity Grid Under High Penetrations of Renewable Energy

    NASA Astrophysics Data System (ADS)

    Macknick, J.; Miara, A.; O'Connell, M.; Vorosmarty, C. J.; Newmark, R. L.

    2017-12-01

    The US power sector is highly dependent upon water resources for reliable operations, primarily for thermoelectric cooling and hydropower technologies. Changes in the availability and temperature of water resources can limit electricity generation and cause outages at power plants, which substantially affect grid-level operational decisions. While the effects of water variability and climate changes on individual power plants are well documented, prior studies have not identified the significance of these impacts at the regional systems-level at which the grid operates, including whether there are risks for large-scale blackouts, brownouts, or increases in production costs. Adequately assessing electric grid system-level impacts requires detailed power sector modeling tools that can incorporate electric transmission infrastructure, capacity reserves, and other grid characteristics. Here, we present for the first time, a study of how climate and water variability affect operations of the power sector, considering different electricity sector configurations (low vs. high renewable) and environmental regulations. We use a case study of the US Eastern Interconnection, building off the Eastern Renewable Generation Integration Study (ERGIS) that explored operational challenges of high penetrations of renewable energy on the grid. We evaluate climate-water constraints on individual power plants, using the Thermoelectric Power and Thermal Pollution (TP2M) model coupled with the PLEXOS electricity production cost model, in the context of broader electricity grid operations. Using a five minute time step for future years, we analyze scenarios of 10% to 30% renewable energy penetration along with considerations of river temperature regulations to compare the cost, performance, and reliability tradeoffs of water-dependent thermoelectric generation and variable renewable energy technologies under climate stresses. This work provides novel insights into the resilience and reliability of different configurations of the US electric grid subject to changing climate conditions.

  11. 10 CFR 205.374 - Responses from “entities” designated in the application.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Electric Power System Permits and Reports; Applications; Administrative Procedures and Sanctions Emergency... appropriate Regional Electric Reliability Council. Pursuant to section 202(c) of the Federal Power Act, DOE... Electric Power § 205.374 Responses from “entities” designated in the application. Each “entity” designated...

  12. 77 FR 39689 - Application To Export Electric Energy; IPR-GDF SUEZ Energy Marketing North America, Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-05

    ... Energy Marketing North America, Inc. AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of application. SUMMARY: IPR-GDF SUEZ Energy Marketing North America, Inc. (GSEMNA) has... Mexico would be surplus energy purchased from electric utilities, Federal power marketing agencies, and...

  13. 75 FR 57911 - Application To Export Electric Energy; GDF SUEZ Energy Marketing NA, Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-23

    ... Marketing NA, Inc. AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of application. SUMMARY: GDF SUEZ Energy Marketing NA, Inc. (GSEMNA) has applied for authority to transmit... purchased from electric utilities, Federal power marketing agencies and other entities within the United...

  14. 77 FR 1474 - Application To Export Electric Energy; AEP Energy Partners, Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-10

    ... DEPARTMENT OF ENERGY [OE Docket No. EA-318-B] Application To Export Electric Energy; AEP Energy Partners, Inc. AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of application. SUMMARY: AEP Energy Partners, Inc. (AEPEP) has applied to renew its authority to transmit...

  15. 77 FR 50487 - Application To Export Electric Energy; RBC Energy Services LP

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-21

    ... DEPARTMENT OF ENERGY [OE Docket No. EA-328-A] Application To Export Electric Energy; RBC Energy Services LP AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of application. SUMMARY: RBC Energy Services LP (RBC Energy) has applied to renew its authority to transmit...

  16. 75 FR 76962 - Application To Export Electric Energy; MAG Energy Solutions, Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-10

    ... DEPARTMENT OF ENERGY [OE Docket No. EA-306-A] Application To Export Electric Energy; MAG Energy Solutions, Inc. AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of Application. SUMMARY: MAG Energy Solutions, Inc. (MAG E.S.) has applied to renew its authority to transmit...

  17. 77 FR 20805 - Application to Export Electric Energy; PPL EnergyPlus, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-06

    ... DEPARTMENT OF ENERGY [OE Docket No. EA-210-C] Application to Export Electric Energy; PPL EnergyPlus, LLC AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of application. SUMMARY: PPL EnergyPlus, LLC. (PPL EnergyPlus) has applied to renew its authority to transmit...

  18. Electric system restructuring and system reliability

    NASA Astrophysics Data System (ADS)

    Horiuchi, Catherine Miller

    In 1996 the California legislature passed AB 1890, explicitly defining economic benefits and detailing specific mechanisms for initiating a partial restructuring the state's electric system. Critics have since sought re-regulation and proponents have asked for patience as the new institutions and markets take shape. Other states' electric system restructuring activities have been tempered by real and perceived problems in the California model. This study examines the reduced regulatory controls and new constraints introduced in California's limited restructuring model using utility and regulatory agency records from the 1990's to investigate effects of new institutions and practices on system reliability for the state's five largest public and private utilities. Logit and negative binomial regressions indicate negative impact from the California model of restructuring on system reliability as measured by customer interruptions. Time series analysis of outage data could not predict the wholesale power market collapse and the subsequent rolling blackouts in early 2001; inclusion of near-outage reliability disturbances---load shedding and energy emergencies---provided a measure of forewarning. Analysis of system disruptions, generation capacity and demand, and the role of purchased power challenge conventional wisdom on the causality of Californian's power problems. The quantitative analysis was supplemented by a targeted survey of electric system restructuring participants. Findings suggest each utility and the organization controlling the state's electric grid provided protection from power outages comparable to pre-restructuring operations through 2000; however, this reliability has come at an inflated cost, resulting in reduced system purchases and decreased marginal protection. The historic margin of operating safety has fully eroded, increasing mandatory load shedding and emergency declarations for voluntary and mandatory conservation. Proposed remedies focused on state-funded contracts and government-managed power authorities may not help, as the findings suggest pricing models, market uncertainty, interjurisdictional conflict and an inability to respond to market perturbations are more significant contributors to reduced regional generation availability than the particular contract mechanisms and funding sources used for power purchases.

  19. Addressing Impacts of Geomagnetic Disturbances on the North American Bulk Power System

    NASA Astrophysics Data System (ADS)

    Rollison, Eric; Moura, John; Lauby, Mark

    2011-08-01

    In a joint report issued in June 2010, the North American Electric Reliability Corporation (NERC) and the U.S. Department of Energy (DOE) identified geomagnetic disturbances as a high-impact, low-frequency (HILF) event risk to bulk power system reliability. The potential impact of geomagnetic disturbance events has gained renewed attention as recent studies have suggested that solar storms may be more severe and reach lower geographic latitudes than formerly expected and can affect bulk power system reliability. The most well known power system experience with geomagnetic disturbances in North America was the 13-14 March 1989 storm, which led to the collapse of the Hydro-Québec system in the early morning hours of 13 March 1989, lasting approximately 9 hours. NERC is actively addressing a range of HILF event risks to bulk power system reliability through the efforts of four of its task forces: Geomagnetic Disturbance, Spare Equipment Database, Cyber and Physical Attack, and Severe Impact Resilience. These task forces operate under the direction of three NERC committees: Planning, Operating, and Critical Infrastructure Protection. The NERC Geomagnetic Disturbance Task Force (GMDTF), which was established in September 2010, is charged with investigating the implications of geomagnetic disturbances to the reliability of bulk power systems and developing solutions to help mitigate these risks. The objective of these efforts is to develop models to better understand the nature and effects of coronal mass ejections (CMEs), the vulnerabilities of equipment, bulk power system design considerations, our ability to reduce the operational and real-time impacts of geomagnetic disturbances on the bulk power system, and restoration methods, as well as to inventory long-lead-time equipment. For more information on the current activities of the GMDTF, please visit: www.nerc.com/filez/gmdtf.html

  20. A comprehensive scoring system to measure healthy community design in land use plans and regulations.

    PubMed

    Maiden, Kristin M; Kaplan, Marina; Walling, Lee Ann; Miller, Patricia P; Crist, Gina

    2017-02-01

    Comprehensive land use plans and their corresponding regulations play a role in determining the nature of the built environment and community design, which are factors that influence population health and health disparities. To determine the level in which a plan addresses healthy living and active design, there is a need for a systematic, reliable and valid method of analyzing and scoring health-related content in plans and regulations. This paper describes the development and validation of a scoring tool designed to measure the strength and comprehensiveness of health-related content found in land use plans and the corresponding regulations. The measures are scored based on the presence of a specific item and the specificity and action-orientation of language. To establish reliability and validity, 42 land use plans and regulations from across the United States were scored January-April 2016. Results of the psychometric analysis indicate the scorecard is a reliable scoring tool for land use plans and regulations related to healthy living and active design. Intraclass correlation coefficients (ICC) scores showed strong inter-rater reliability for total strength and comprehensiveness. ICC scores for total implementation scores showed acceptable consistency among scorers. Cronbach's alpha values for all focus areas were acceptable. Strong content validity was measured through a committee vetting process. The development of this tool has far-reaching implications, bringing standardization of measurement to the field of land use plan assessment, and paving the way for systematic inclusion of health-related design principles, policies, and requirements in land use plans and their corresponding regulations. Copyright © 2016 Elsevier Inc. All rights reserved.

  1. Electric Vehicle Charging Station Expansion Plans Under Uncertainty

    DOT National Transportation Integrated Search

    2016-12-01

    With the advancement of battery technologies, more electric vehicles are expected to get introduced in the market. The energy needed to run those batteries is enormous. This calls for developing optimization models that help governments plan for ener...

  2. Feasibility study for the swaziland/mozambique interconector. Executive summary of the final report. Export trade information

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-11-01

    This study, conducted by Black & Veatch, was funded by the U.S. Trade and Development Agency. The report, produced for the Ministry of National Resources, Energy and Environment (MNRE) of Swaziland, determines the least cost capacity expansion option to meet the future power demand and system reliability criteria of Swaziland, with particular emphasis on the propsoed Interconnector between Swaziland and Mozambique. Volume 1 contains the Executive Summary and is divided into the following sections: (1.0) Study Objectives; (2.0) Swaziland and its Economy; (3.0) The Power Sector Structure in Swaziland; (4.0) Electric Power Resources; (5.0) Past Demand Growth; (6.0) Load andmore » Energy Forecasts; (7.0) Need for Power; (8.0) Generation and Transmission Capacity Addition Option; (9.0) SEB Expansion Plan Scenario Development; (10.0) EDM Expansion Plan Development; (11.0) Cost Sharing of the Interconnector; (12.0) Interconnector Options and Environmental Evaluation; (13.0) Generation/Transmission Trade Offs; (14.0) EPC RFP and Draft Interconnection Agreement; (15.0) Transmission System Study; (16.0) Conclusions and Recommendations.« less

  3. Storage Reliability of Missile Materiel Program. Storage Reliability Analysis Summary Report. Volume 1. Electrical and Electronic Devices

    DTIC Science & Technology

    1976-05-01

    since the platinum silicide and titanium metals also offer very low mobility to the alkaline ions, the BLSJ . is inert to sodium . Inversion and...gettering agents for sodium ions, thus making the cont&-nination far less mobile. The stability of the structural and electrical properties of the oxide...to be an effective barrier to sodium migration. In Beam Lead Sealed ,unction (BLSJ) devices, the silicon nitride seals the devices from sodium and

  4. Quantification of the effect of electrical and thermal parameters on radiofrequency ablation for concentric tumour model of different sizes.

    PubMed

    Jamil, Muhammad; Ng, E Y K

    2015-07-01

    Radiofrequency ablation (RFA) has been increasingly used in treating cancer for multitude of situations in various tissue types. To perform the therapy safely and reliably, the effect of critical parameters needs to be known beforehand. Temperature plays an important role in the outcome of the therapy and any uncertainties in temperature assessment can be lethal. This study presents the RFA case of fixed tip temperature where we've analysed the effect of electrical conductivity, thermal conductivity and blood perfusion rate of the tumour and surrounding normal tissue on the radiofrequency ablation. Ablation volume was chosen as the characteristic to be optimised and temperature control was achieved via PID controller. The effect of all 6 parameters each having 3 levels was quantified with minimum number of experiments harnessing the fractional factorial characteristic of Taguchi's orthogonal arrays. It was observed that as the blood perfusion increases the ablation volume decreases. Increasing electrical conductivity of the tumour results in increase of ablation volume whereas increase in normal tissue conductivity tends to decrease the ablation volume and vice versa. Likewise, increasing thermal conductivity of the tumour results in enhanced ablation volume whereas an increase in thermal conductivity of the surrounding normal tissue has a debilitating effect on the ablation volume and vice versa. With increase in the size of the tumour (i.e., 2-3cm) the effect of each parameter is not linear. The parameter effect varies with change in size of the tumour that is manifested by the different gradient observed in ablation volume. Most important is the relative insensitivity of ablation volume to blood perfusion rate for smaller tumour size (2cm) that is also in accordance with the previous results presented in literature. These findings will provide initial insight for safe, reliable and improved treatment planning perceptively. Copyright © 2015 Elsevier Ltd. All rights reserved.

  5. Distributed Generation of Electricity and its Environmental Impacts

    EPA Pesticide Factsheets

    Distributed generation refers to technologies that generate electricity at or near where it will be used. Learn about how distributed energy generation can support the delivery of clean, reliable power to additional customers.

  6. Staff Report to the Secretary on Electricity Markets and Reliability

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    Energy Secretary Rick Perry issued a memo in April of 2017 requesting a study and directing his staff to develop a report to include an assessment of the reliability and resilience of the electric grid and an overview of the evolution of electricity markets. Various factors have emerged over the past 15 years which have impacted power supply and demand in different ways. This study, prepared by experts throughout the Department, contains a comprehensive analysis of these factors and the corresponding data, and presents a series of recommendations meant to inform and guide policy makers, regulators, and the general public.more » Potential areas for further research are also presented.« less

  7. Lafayette, Colorado: Using Energy Data for Electric Vehicle Infrastructure Planning (City Energy: From Data to Decisions)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Office of Strategic Programs, Strategic Priorities and Impact Analysis Team

    This fact sheet "Lafayette, Colorado: Using Energy Data for Electric Vehicle Infrastructure Planning" explains how the City of Lafayette used data from the U.S. Department of Energy's Cities Leading through Energy Analysis and Planning (Cities-LEAP) and the State and Local Energy Data (SLED) programs to inform its city energy planning. It is one of ten fact sheets in the "City Energy: From Data to Decisions" series.

  8. Planning for electric vehicle needs by coupling charging profiles with urban mobility

    NASA Astrophysics Data System (ADS)

    Xu, Yanyan; ćolak, Serdar; Kara, Emre C.; Moura, Scott J.; González, Marta C.

    2018-06-01

    The rising adoption of plug-in electric vehicles (PEVs) leads to the temporal alignment of their electricity and mobility demands. However, mobility demand has not yet been considered in electricity planning and management. Here, we present a method to estimate individual mobility of PEV drivers at fine temporal and spatial resolution, by integrating three unique datasets of mobile phone activity of 1.39 million Bay Area residents, census data and the PEV drivers survey data. Through coupling the uncovered patterns of PEV mobility with the charging activity of PEVs in 580,000 session profiles obtained in the same region, we recommend changes in PEV charging times of commuters at their work stations and shave the pronounced peak in power demand. Informed by the tariff of electricity, we calculate the monetary gains to incentivize the adoption of the recommendations. These results open avenues for planning for the future of coupled transportation and electricity needs using personalized data.

  9. Electrical load management at the Goldstone DSN Complex

    NASA Technical Reports Server (NTRS)

    Rayburn, J. C.

    1981-01-01

    A Power Load Management Plan was deveoped which utilizes the unique power generating capabilities of the stations to reduce the stress on the local utility's reserve capacity and reduce the cost of electrical power at the stations. The plan has greatly reduced the cost of Goldstone electrical power by completely eliminating the use of commercial power during the local utility's high usage periods each day.

  10. 75 FR 36385 - Reliability Standards Development and NERC and Regional Entity Enforcement Supplemental Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-25

    ... Standards Development and NERC and Regional Entity Enforcement Supplemental Notice of Technical Conference... development and enforcement of mandatory Reliability Standards for the Bulk-Power System by the North American Electric Reliability Corporation and the Regional Entities. The conference will be held on Tuesday, July 6...

  11. 78 FR 58295 - Commission Information Collection Activities (FERC-725A); Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-23

    ... submitting the information collection FERC-725A, Mandatory Reliability Standards for the Bulk Power System... collection analysis associated with its approval of Reliability Standard EOP-004-2, in an order published in... solicitation and is making this notation in its submission to OMB. \\1\\ North American Electric Reliability Corp...

  12. Electrical Performance and Reliability Improvement of Amorphous-Indium-Gallium-Zinc-Oxide Thin-Film Transistors with HfO₂ Gate Dielectrics by CF₄ Plasma Treatment.

    PubMed

    Fan, Ching-Lin; Tseng, Fan-Ping; Tseng, Chiao-Yuan

    2018-05-17

    In this work, amorphous indium-gallium-zinc oxide thin-film transistors (a-IGZO TFTs) with a HfO₂ gate insulator and CF₄ plasma treatment was demonstrated for the first time. Through the plasma treatment, both the electrical performance and reliability of the a-IGZO TFT with HfO₂ gate dielectric were improved. The carrier mobility significantly increased by 80.8%, from 30.2 cm²/V∙s (without treatment) to 54.6 cm²/V∙s (with CF₄ plasma treatment), which is due to the incorporated fluorine not only providing an extra electron to the IGZO, but also passivating the interface trap density. In addition, the reliability of the a-IGZO TFT with HfO₂ gate dielectric has also been improved by the CF₄ plasma treatment. By applying the CF₄ plasma treatment to the a-IGZO TFT, the hysteresis effect of the device has been improved and the device's immunity against moisture from the ambient atmosphere has been enhanced. It is believed that the CF₄ plasma treatment not only significantly improves the electrical performance of a-IGZO TFT with HfO₂ gate dielectric, but also enhances the device's reliability.

  13. Electrical impedance myography in facioscapulohumeral muscular dystrophy.

    PubMed

    Statland, Jeffrey M; Heatwole, Chad; Eichinger, Katy; Dilek, Nuran; Martens, William B; Tawil, Rabi

    2016-10-01

    In this study we determined the reliability and validity of electrical impedance myography (EIM) in facioscapulohumeral muscular dystrophy (FSHD). We performed a prospective study of EIM on 16 bilateral limb and trunk muscles in 35 genetically defined and clinically affected FSHD patients (reliability testing on 18 patients). Summary scores based on body region were derived. Reactance and phase (50 and 100 kHz) were compared with measures of strength, FSHD disease severity, and functional outcomes. Participants were mostly men, mean age 53.0 years, and included a full range of severity. Limb and trunk muscles showed good to excellent reliability [intraclass correlation coefficients (ICC) 0.72-0.99]. Summary scores for the arm, leg, and trunk showed excellent reliability (ICC 0.89-0.98). Reactance was the most sensitive EIM parameter to a broad range of FSHD disease metrics. EIM is a reliable measure of muscle composition in FSHD that offers the possibility to serially evaluate affected muscles. Muscle Nerve 54: 696-701, 2016. © 2016 Wiley Periodicals, Inc.

  14. Real time monitoring system used in route planning for the electric vehicle

    NASA Astrophysics Data System (ADS)

    Ionescu, LM; Mazare, A.; Serban, G.; Ionita, S.

    2017-10-01

    The electric vehicle is a new consumer of electricity that is becoming more and more widespread. Under these circumstances, new strategies for optimizing power consumption and increasing vehicle autonomy must be designed. These must include route planning along with consumption, fuelling points and points of interest. The hardware and software solution proposed by us allows: non-invasive monitoring of power consumption, energy autonomy - it does not add any extra consumption, data transmission to a server and data fusion with the route, the points of interest of the route and the power supply points. As a result: an optimal route planning service will be provided to the driver, considering the route, the requirements of the electric vehicle and the consumer profile. The solution can be easily installed on any type of electric car - it does not involve any intervention on the equipment.

  15. High-resolution integration of water, energy, and climate models to assess electricity grid vulnerabilities to climate change

    NASA Astrophysics Data System (ADS)

    Meng, M.; Macknick, J.; Tidwell, V. C.; Zagona, E. A.; Magee, T. M.; Bennett, K.; Middleton, R. S.

    2017-12-01

    The U.S. electricity sector depends on large amounts of water for hydropower generation and cooling thermoelectric power plants. Variability in water quantity and temperature due to climate change could reduce the performance and reliability of individual power plants and of the electric grid as a system. While studies have modeled water usage in power systems planning, few have linked grid operations with physical water constraints or with climate-induced changes in water resources to capture the role of the energy-water nexus in power systems flexibility and adequacy. In addition, many hydrologic and hydropower models have a limited representation of power sector water demands and grid interaction opportunities of demand response and ancillary services. A multi-model framework was developed to integrate and harmonize electricity, water, and climate models, allowing for high-resolution simulation of the spatial, temporal, and physical dynamics of these interacting systems. The San Juan River basin in the Southwestern U.S., which contains thermoelectric power plants, hydropower facilities, and multiple non-energy water demands, was chosen as a case study. Downscaled data from three global climate models and predicted regional water demand changes were implemented in the simulations. The Variable Infiltration Capacity hydrologic model was used to project inflows, ambient air temperature, and humidity in the San Juan River Basin. Resulting river operations, water deliveries, water shortage sharing agreements, new water demands, and hydroelectricity generation at the basin-scale were estimated with RiverWare. The impacts of water availability and temperature on electric grid dispatch, curtailment, cooling water usage, and electricity generation cost were modeled in PLEXOS. Lack of water availability resulting from climate, new water demands, and shortage sharing agreements will require thermoelectric generators to drastically decrease power production, as much as 50% during intensifying drought scenarios, which can have broader electricity sector system implications. Results relevant to stakeholder and power provider interests highlight the vulnerabilities in grid operations driven by water shortage agreements and changes in the climate.

  16. Reliability Analysis of Differential Relay as Main Protection Transformer Using Fuzzy Logic Algorithm

    NASA Astrophysics Data System (ADS)

    Mulyadi, Y.; Sucita, T.; Sumarto; Alpani, M.

    2018-02-01

    Electricity supply demand is increasing every year. It makes PT. PLN (Persero) is required to provide optimal customer service and satisfaction. Optimal service depends on the performance of the equipment of the power system owned, especially the transformer. Power transformer is an electrical equipment that transforms electricity from high voltage to low voltage or vice versa. However, in the electrical power system, is inseparable from interference included in the transformer. But, the disturbance can be minimized by the protection system. The main protection transformer is differential relays. Differential relays working system using Kirchoff law where inflows equal outflows. If there are excessive currents that interfere then the relays will work. But, the relay can also experience decreased performance. Therefore, this final project aims to analyze the reliability of the differential relay on the transformer in three different substations. Referring to the standard applied by the transmission line protection officer, the differential relay shall have slope characteristics of 30% in the first slope and 80% in the second slope when using two slopes and 80% when using one slope with an instant time and the corresponding ratio. So, the results obtained on the Siemens differential release have a reliable slope characteristic with a value of 30 on the fuzzy logic system. In a while, ABB a differential relay is only 80% reliable because two experiments are not reliable. For the time, all the differential relays are instant with a value of 0.06 on the fuzzy logic system. For ratios, the differential relays ABB have a better value than others brand with a value of 151 on the fuzzy logic system.

  17. The Role of Demand Response in Reducing Water-Related Power Plant Vulnerabilities

    NASA Astrophysics Data System (ADS)

    Macknick, J.; Brinkman, G.; Zhou, E.; O'Connell, M.; Newmark, R. L.; Miara, A.; Cohen, S. M.

    2015-12-01

    The electric sector depends on readily available water supplies for reliable and efficient operation. Elevated water temperatures or low water levels can trigger regulatory or plant-level decisions to curtail power generation, which can affect system cost and reliability. In the past decade, dozens of power plants in the U.S. have curtailed generation due to water temperatures and water shortages. Curtailments occur during the summer, when temperatures are highest and there is greatest demand for electricity. Climate change could alter the availability and temperature of water resources, exacerbating these issues. Constructing alternative cooling systems to address vulnerabilities can be capital intensive and can also affect power plant efficiencies. Demand response programs are being implemented by electric system planners and operators to reduce and shift electricity demands from peak usage periods to other times of the day. Demand response programs can also play a role in reducing water-related power sector vulnerabilities during summer months. Traditionally, production cost modeling and demand response analyses do not include water resources. In this effort, we integrate an electricity production cost modeling framework with water-related impacts on power plants in a test system to evaluate the impacts of demand response measures on power system costs and reliability. Specifically, we i) quantify the cost and reliability implications of incorporating water resources into production cost modeling, ii) evaluate the impacts of demand response measures on reducing system costs and vulnerabilities, and iii) consider sensitivity analyses with cooling systems to highlight a range of potential benefits of demand response measures. Impacts from climate change on power plant performance and water resources are discussed. Results provide key insights to policymakers and practitioners for reducing water-related power plant vulnerabilities via lower cost methods.

  18. Thermal Management and Reliability of Power Electronics and Electric Machines

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Narumanchi, Sreekant

    2016-09-19

    Increasing the number of electric-drive vehicles (EDVs) on America's roads has been identified as a strategy with near-term potential for dramatically decreasing the nation's dependence on oil - by the U.S. Department of Energy, the federal cross-agency EV-Everywhere Challenge, and the automotive industry. Mass-market deployment will rely on meeting aggressive technical targets, including improved efficiency and reduced size, weight, and cost. Many of these advances will depend on optimization of thermal management. Effective thermal management is critical to improving the performance and ensuring the reliability of EDVs. Efficient heat removal makes higher power densities and lower operating temperatures possible, andmore » in turn enables cost and size reductions. The National Renewable Energy Laboratory (NREL), along with DOE and industry partners is working to develop cost-effective thermal management solutions to increase device and component power densities. In this presentation, the activities in recent years related to thermal management and reliability of automotive power electronics and electric machines are presented.« less

  19. Transit Reliability Information Program : Reliability Verification Demonstration Plan for Rapid Rail Vehicles

    DOT National Transportation Integrated Search

    1981-08-01

    The Transit Reliability Information Program (TRIP) is a government-initiated program to assist the transit industry in satisfying its need for transit reliability information. TRIP provides this assistance through the operation of a national Data Ban...

  20. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This fact sheet describes the collaboration between NREL, SolarCity, and the Hawaiian Electric Companies at the Energy Systems Integration Facility (ESIF) to address the safety, reliability, and stability challenges of interconnecting high penetrations of distributed photovoltaics with the electric power system.

  1. Energy and Environment Guide to Action - Chapter 7: Electric Utility Policies

    EPA Pesticide Factsheets

    Focuses on the authorites that state legislatures have granted to PUCs to regulate electricity and reliability, as these authorities directly affect utilities' and customers' investments in energy efficiency, renewable energy, and CHP.

  2. Automated Demand Response for Energy Sustainability

    DTIC Science & Technology

    2015-05-01

    project’s stated performance objectives. Emerging opportunities to participate in wholesale electricity markets can provide important economic, energy, and...Response in Wholesale Electricity Markets ..................................................... 7 Figure 5. Demand Bidding Communication and Control...resource in response to market or reliability conditions Demand Bidding Program DR programs that encourage customers to bid into an electricity market

  3. 78 FR 64207 - Application To Export Electric Energy; New Brunswick Energy Marketing Corporation (f/k/a New...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-28

    ... DEPARTMENT OF ENERGY [OE Docket No. EA-345-A] Application To Export Electric Energy; New Brunswick Energy Marketing Corporation (f/k/a New Brunswick Power Generation Corp.) AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of Application. SUMMARY: New Brunswick Energy...

  4. 75 FR 45607 - Application To Export Electric Energy; Manitoba Hydro

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-03

    ... that the proposed action will not adversely impact on the reliability of the U.S. electric power supply... United States to Canada pursuant to section 202(e) of the Federal Power Act (FPA). DATES: Comments... electric energy from the United States to Canada as a power marketer using existing international...

  5. Early-Stage Research & Development | Transportation Research | NREL

    Science.gov Websites

    thermal conductivity of packed copper wire used in electric-drive vehicle motor applications provides a research on thermal management in copper-wound electric motors is helping to improve the performance and reliability of electric-drive vehicles. Photo by Kevin Bennion, NREL. Anisotropic Thermal Measurement Study

  6. Strategies, Protections and Mitigations for Electric Grid from Electromagnetic Pulse Effects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Foster, Rita Ann; Frickey, Steven Jay

    2016-01-01

    The mission of DOE’s Office of Electricity Delivery and Energy Reliability (OE) is to lead national efforts to modernize the electricity delivery system, enhance the security and reliability of America’s energy infrastructure and facilitate recovery from disruptions to the energy supply. One of the threats OE is concerned about is a high-altitude electro-magnetic pulse (HEMP) from a nuclear explosion and eletro-magnetic pulse (EMP) or E1 pulse can be generated by EMP weapons. DOE-OE provides federal leadership and technical guidance in addressing electric grid issues. The Idaho National Laboratory (INL) was chosen to conduct the EMP study for DOE-OE due tomore » its capabilities and experience in setting up EMP experiments on the electric grid and conducting vulnerability assessments and developing innovative technology to increase infrastructure resiliency. This report identifies known impacts to EMP threats, known mitigations and effectiveness of mitigations, potential cost of mitigation, areas for government and private partnerships in protecting the electric grid to EMP, and identifying gaps in our knowledge and protection strategies.« less

  7. On the reliability of voltage and power as input parameters for the characterization of high power ultrasound applications

    NASA Astrophysics Data System (ADS)

    Haller, Julian; Wilkens, Volker

    2012-11-01

    For power levels up to 200 W and sonication times up to 60 s, the electrical power, the voltage and the electrical impedance (more exactly: the ratio of RMS voltage and RMS current) have been measured for a piezocomposite high intensity therapeutic ultrasound (HITU) transducer with integrated matching network, two piezoceramic HITU transducers with external matching networks and for a passive dummy 50 Ω load. The electrical power and the voltage were measured during high power application with an inline power meter and an RMS voltage meter, respectively, and the complex electrical impedance was indirectly measured with a current probe, a 100:1 voltage probe and a digital scope. The results clearly show that the input RMS voltage and the input RMS power change unequally during the application. Hence, the indication of only the electrical input power or only the voltage as the input parameter may not be sufficient for reliable characterizations of ultrasound transducers for high power applications in some cases.

  8. The Challenge Posed by Geomagnetic Activity to Electric Power Reliability: Evidence From England and Wales

    NASA Astrophysics Data System (ADS)

    Forbes, Kevin F.; St. Cyr, O. C.

    2017-10-01

    This paper addresses whether geomagnetic activity challenged the reliability of the electric power system during part of the declining phase of solar cycle 23. Operations by National Grid in England and Wales are examined over the period of 11 March 2003 through 31 March 2005. This paper examines the relationship between measures of geomagnetic activity and a metric of challenged electric power reliability known as the net imbalance volume (NIV). Measured in megawatt hours, NIV represents the sum of all energy deployments initiated by the system operator to balance the electric power system. The relationship between geomagnetic activity and NIV is assessed using a multivariate econometric model. The model was estimated using half-hour settlement data over the period of 11 March 2003 through 31 December 2004. The results indicate that geomagnetic activity had a demonstrable effect on NIV over the sample period. Based on the parameter estimates, out-of-sample predictions of NIV were generated for each half hour over the period of 1 January to 31 March 2005. Consistent with the existence of a causal relationship between geomagnetic activity and the electricity market imbalance, the root-mean-square error of the out-of-sample predictions of NIV is smaller; that is, the predictions are more accurate, when the statistically significant estimated effects of geomagnetic activity are included as drivers in the predictions.

  9. High-density carrier-accumulated and electrically stable oxide thin-film transistors from ion-gel gate dielectric

    PubMed Central

    Fujii, Mami N.; Ishikawa, Yasuaki; Miwa, Kazumoto; Okada, Hiromi; Uraoka, Yukiharu; Ono, Shimpei

    2015-01-01

    The use of indium–gallium–zinc oxide (IGZO) has paved the way for high-resolution uniform displays or integrated circuits with transparent and flexible devices. However, achieving highly reliable devices that use IGZO for low-temperature processes remains a technological challenge. We propose the use of IGZO thin-film transistors (TFTs) with an ionic-liquid gate dielectric in order to achieve high-density carrier-accumulated IGZO TFTs with high reliability, and we discuss a distinctive mechanism for the degradation of this organic–inorganic hybrid device under long-term electrical stress. Our results demonstrated that an ionic liquid or gel gate dielectric provides highly reliable and low-voltage operation with IGZO TFTs. Furthermore, high-density carrier accumulation helps improve the TFT characteristics and reliability, and it is highly relevant to the electronic phase control of oxide materials and the degradation mechanism for organic–inorganic hybrid devices. PMID:26677773

  10. High-density carrier-accumulated and electrically stable oxide thin-film transistors from ion-gel gate dielectric.

    PubMed

    Fujii, Mami N; Ishikawa, Yasuaki; Miwa, Kazumoto; Okada, Hiromi; Uraoka, Yukiharu; Ono, Shimpei

    2015-12-18

    The use of indium-gallium-zinc oxide (IGZO) has paved the way for high-resolution uniform displays or integrated circuits with transparent and flexible devices. However, achieving highly reliable devices that use IGZO for low-temperature processes remains a technological challenge. We propose the use of IGZO thin-film transistors (TFTs) with an ionic-liquid gate dielectric in order to achieve high-density carrier-accumulated IGZO TFTs with high reliability, and we discuss a distinctive mechanism for the degradation of this organic-inorganic hybrid device under long-term electrical stress. Our results demonstrated that an ionic liquid or gel gate dielectric provides highly reliable and low-voltage operation with IGZO TFTs. Furthermore, high-density carrier accumulation helps improve the TFT characteristics and reliability, and it is highly relevant to the electronic phase control of oxide materials and the degradation mechanism for organic-inorganic hybrid devices.

  11. Improvement of the Reliability of Dielectrics for MLCC

    NASA Astrophysics Data System (ADS)

    Nakamura, Tomoyuki; Yao, Takayuki; Ikeda, Jun; Kubodera, Noriyuki; Takagi, Hiroshi

    2011-10-01

    To achieve enough reliability of monolithic ceramic capacitor, it is important to know the contribution of grain boundary and grain interior to its reliability and insulation resistance. As the number of grain boundaries per layer increased, mean time to failure (MTTF) increased. In addition, as the number of grain boundaries per layer increased, samples showed lower current leakage in the measured electric field range. Using these data, the grain boundary E-J curves were determined by simulation. As a result, temperature and electric field dependence of insulation resistance of grain boundary were very low. The insulation characteristics of one BaTiO3 grain per layer were examined. The resistance and reliability of grain interior were very low. To improve the degradation resistance of grain interior, Ca-doped BaTiO3-based dielectrics were developed. The influence of Ca substitution on MTTF was investigated and it was found out that MTTF increased with the increase of Ca substitution.

  12. Excess Capacity in China’s Power Systems: A Regional Analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lin, Jiang; Liu, Xu; Karl, Fredrich

    2016-11-01

    This paper examines China’s regional electricity grids using a reliability perspective, which is commonly measured in terms of a reserve margin. Our analysis shows that at the end of 2014, the average reserve margin for China as a whole was roughly 28%, almost twice as high as a typical planning reserve margin in the U.S. However, this national average masks huge variations in reserve margins across major regional power grid areas: the northeastern region has the highest reserve margin of over 60%, followed by the northwestern region at 49%, and the southern grid area at 35%. In this analysis, wemore » also examined future reserve margins for regional electricity grids in China under two scenarios: 1) a low scenario of national annual electricity consumption growth rates of 1.5% between 2015 and 2020 and 1.0% between 2020 and 2025, and 2) a high scenario of annual average growth rates of 3.0% and 2.0%, respectively. Both scenarios suggest that the northeastern, northwestern, and southern regions have significant excess generation capacity, and that this excess capacity situation will continue over the next decade without regulatory intervention. The northern and central regions could have sufficient generation capacity to 2020, but may require additional resources in a higher growth scenario. The eastern region requires new resources by 2020 in both scenarios.« less

  13. Exploring Crisis Management in U.S. Small Businesses

    NASA Astrophysics Data System (ADS)

    Williams, Jon

    As a critical infrastructure, the US electricity grid supplies electricity to 340 million people within eight separate regions. The power infrastructure is vulnerable to many types of disasters capable of severing supplies of electricity. The impact on the employees and communities when small- and medium-size enterprises are shut down due to disasters can be severe. The purpose of the quantitative comparative study was to explore small- and medium-size enterprises crisis management strategies in the case of power infrastructure vulnerabilities. Perceptions of small business leaders were probed about crisis management planning relevant to three secondary factors: prior experience of crises, threat perceptions, and planning self-efficacy. Participants completed an adapted questionnaire instrument based on a five-point Likert scale for six sub-factors including resilience through planning, financial impact, operational crisis management, the perfect storm, the aftermath of survival, and atrophy. The instrument also measured three additional factors to include, prior experience of crises, threat perceptions, and planning self-efficacy, across seven types of crises. The results of this study indicated that of the 276 respondents, 104 had no crisis plans, but 172 did have crisis plans. Of those who had implemented crisis plans, 19% had specific provisions to address power outages or attacks on the electrical grid. Of the respondents who had not planned for power outages nor experienced significant losses of power, a statistically significant number acknowledged an external threat to their business. The majority of respondents indicated that long-term planning was related to resilience; however, the migration of crisis understanding into the planning process or implementation was not implemented. This heightened awareness of potential crises without the corresponding development and implementation of mitigation crisis plans requires additional research to understand drivers effecting the decision making process with crisis managers.

  14. Missile and Space Systems Reliability versus Cost Trade-Off Study

    DTIC Science & Technology

    1983-01-01

    F00-1C09 Robert C. Schneider F00-1C09 V . PERFORMING ORGANIZATION NAME AM0 ADDRESS 16 PRGRAM ELEMENT. PROJECT. TASK BoeingAerosace CmpAnyA CA WORK UNIT...reliability problems, which has the - real bearing on program effectiveness. A well planned and funded reliability effort can prevent or ferret out...failure analysis, and the in- corporation and verification of design corrections to prevent recurrence of failures. 302.2.2 A TMJ test plan shall be

  15. 76 FR 23222 - Electric Reliability Organization Interpretation of Transmission Operations Reliability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-26

    ... applications or print-to-PDF format, and not in a scanned format, at http://www.ferc.gov/docs-filing/efiling....3d 1342 (DC Cir. 2009). \\5\\ Mandatory Reliability Standards for the Bulk-Power System, Order No. 693... applications or print-to-PDF format and not in a scanned format. Commenters filing electronically do not need...

  16. 75 FR 52528 - Mandatory Reliability Standards for the Bulk-Power System; Notice of Technical Conference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-26

    ... Frequency Response in the Wholesale Electric Grid on Thursday, September 23, from 10 a.m. to approximately 4... Order No. 693 the Commission approved Reliability Standard BAL-003-0 as mandatory and enforceable and directed the ERO to develop a modification to BAL-003-0 through the Reliability Standards development...

  17. Drought and Heat Wave Impacts on Electricity Grid Reliability in Illinois

    NASA Astrophysics Data System (ADS)

    Stillwell, A. S.; Lubega, W. N.

    2016-12-01

    A large proportion of thermal power plants in the United States use cooling systems that discharge large volumes of heated water into rivers and cooling ponds. To minimize thermal pollution from these discharges, restrictions are placed on temperatures at the edge of defined mixing zones in the receiving waters. However, during extended hydrological droughts and heat waves, power plants are often granted thermal variances permitting them to exceed these temperature restrictions. These thermal variances are often deemed necessary for maintaining electricity reliability, particularly as heat waves cause increased electricity demand. Current practice, however, lacks tools for the development of grid-scale operational policies specifying generator output levels that ensure reliable electricity supply while minimizing thermal variances. Such policies must take into consideration characteristics of individual power plants, topology and characteristics of the electricity grid, and locations of power plants within the river basin. In this work, we develop a methodology for the development of these operational policies that captures necessary factors. We develop optimal rules for different hydrological and meteorological conditions, serving as rule curves for thermal power plants. The rules are conditioned on leading modes of the ambient hydrological and meteorological conditions at the different power plant locations, as the locations are geographically close and hydrologically connected. Heat dissipation in the rivers and cooling ponds is modeled using the equilibrium temperature concept. Optimal rules are determined through a Monte Carlo sampling optimization framework. The methodology is applied to a case study of eight power plants in Illinois that were granted thermal variances in the summer of 2012, with a representative electricity grid model used in place of the actual electricity grid.

  18. 77 FR 26686 - Transmission Planning Reliability Standards

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-07

    ... Normal (No Contingency) Conditions (Category A), TPL-002-1b--System Performance Following Loss of a... Reliability Standard should not allow an entity to plan for the loss of non-consequential firm load in the... approval of its proposal to revise and clarify footnote `b' ``in regard to load loss following a single...

  19. Smart Grid Risk Management

    NASA Astrophysics Data System (ADS)

    Abad Lopez, Carlos Adrian

    Current electricity infrastructure is being stressed from several directions -- high demand, unreliable supply, extreme weather conditions, accidents, among others. Infrastructure planners have, traditionally, focused on only the cost of the system; today, resilience and sustainability are increasingly becoming more important. In this dissertation, we develop computational tools for efficiently managing electricity resources to help create a more reliable and sustainable electrical grid. The tools we present in this work will help electric utilities coordinate demand to allow the smooth and large scale integration of renewable sources of energy into traditional grids, as well as provide infrastructure planners and operators in developing countries a framework for making informed planning and control decisions in the presence of uncertainty. Demand-side management is considered as the most viable solution for maintaining grid stability as generation from intermittent renewable sources increases. Demand-side management, particularly demand response (DR) programs that attempt to alter the energy consumption of customers either by using price-based incentives or up-front power interruption contracts, is more cost-effective and sustainable in addressing short-term supply-demand imbalances when compared with the alternative that involves increasing fossil fuel-based fast spinning reserves. An essential step in compensating participating customers and benchmarking the effectiveness of DR programs is to be able to independently detect the load reduction from observed meter data. Electric utilities implementing automated DR programs through direct load control switches are also interested in detecting the reduction in demand to efficiently pinpoint non-functioning devices to reduce maintenance costs. We develop sparse optimization methods for detecting a small change in the demand for electricity of a customer in response to a price change or signal from the utility, dynamic learning methods for scheduling the maintenance of direct load control switches whose operating state is not directly observable and can only be inferred from the metered electricity consumption, and machine learning methods for accurately forecasting the load of hundreds of thousands of residential, commercial and industrial customers. These algorithms have been implemented in the software system provided by AutoGrid, Inc., and this system has helped several utilities in the Pacific Northwest, Oklahoma, California and Texas, provide more reliable power to their customers at significantly reduced prices. Providing power to widely spread out communities in developing countries using the conventional power grid is not economically feasible. The most attractive alternative source of affordable energy for these communities is solar micro-grids. We discuss risk-aware robust methods to optimally size and operate solar micro-grids in the presence of uncertain demand and uncertain renewable generation. These algorithms help system operators to increase their revenue while making their systems more resilient to inclement weather conditions.

  20. Energy and Environment Guide to Action - Chapter 7.0: Electric Utility Policies

    EPA Pesticide Factsheets

    Focuses on the authorites that state legislatures have granted to PUCs to regulate electricity and reliability, as these authorities directly affect utilities' and customers' investments in energy efficiency, renewable energy, and CHP.

  1. Body Fat Measurement: Weighing the Pros and Cons of Electrical Impedance.

    ERIC Educational Resources Information Center

    Nash, Heyward L.

    1985-01-01

    Research technologists have developed electrical impedance units in response to demand for a convenient and reliable method of measuring body fat. Accuracy of impedance measures versus calipers and underwater weighing are discussed. (MT)

  2. Alternative Fuels Data Center: Deployment of Hybrid and Plug-In Electric

    Science.gov Websites

    standard permit for residential charging stations that allows for quick, safe installation of electric and inspector prepare homes for safe and reliable vehicle charging. Clean Cities Project Awards The

  3. Stretchable biocompatible electronics by embedding electrical circuitry in biocompatible elastomers.

    PubMed

    Jahanshahi, Amir; Salvo, Pietro; Vanfleteren, Jan

    2012-01-01

    Stretchable and curvilinear electronics has been used recently for the fabrication of micro systems interacting with the human body. The applications range from different kinds of implantable sensors inside the body to conformable electrodes and artificial skins. One of the key parameters in biocompatible stretchable electronics is the fabrication of reliable electrical interconnects. Although very recent literature has reported on the reliability of stretchable interconnects by cyclic loading, work still needs to be done on the integration of electrical circuitry composed of rigid components and stretchable interconnects in a biological environment. In this work, the feasibility of a developed technology to fabricate simple electrical circuits with meander shaped stretchable interconnects is presented. Stretchable interconnects are 200 nm thin Au layer supported with polyimide (PI). A stretchable array of light emitting diodes (LEDs) is embedded in biocompatible elastomer using this technology platform and it features a 50% total elongation.

  4. Electric vehicle charging station implementation plans for the Upstate New York I-90 corridor : final report.

    DOT National Transportation Integrated Search

    2016-08-01

    Public charging stations allow electric vehicle (EV) owners to have the ability and confidence to drive throughout New York State; for travel within and between metropolitan areas. Incorporating EV charging station planning into broader local and reg...

  5. A probabilistic assessment of large scale wind power development for long-term energy resource planning

    NASA Astrophysics Data System (ADS)

    Kennedy, Scott Warren

    A steady decline in the cost of wind turbines and increased experience in their successful operation have brought this technology to the forefront of viable alternatives for large-scale power generation. Methodologies for understanding the costs and benefits of large-scale wind power development, however, are currently limited. In this thesis, a new and widely applicable technique for estimating the social benefit of large-scale wind power production is presented. The social benefit is based upon wind power's energy and capacity services and the avoidance of environmental damages. The approach uses probabilistic modeling techniques to account for the stochastic interaction between wind power availability, electricity demand, and conventional generator dispatch. A method for including the spatial smoothing effect of geographically dispersed wind farms is also introduced. The model has been used to analyze potential offshore wind power development to the south of Long Island, NY. If natural gas combined cycle (NGCC) and integrated gasifier combined cycle (IGCC) are the alternative generation sources, wind power exhibits a negative social benefit due to its high capacity cost and the relatively low emissions of these advanced fossil-fuel technologies. Environmental benefits increase significantly if charges for CO2 emissions are included. Results also reveal a diminishing social benefit as wind power penetration increases. The dependence of wind power benefits on natural gas and coal prices is also discussed. In power systems with a high penetration of wind generated electricity, the intermittent availability of wind power may influence hourly spot prices. A price responsive electricity demand model is introduced that shows a small increase in wind power value when consumers react to hourly spot prices. The effectiveness of this mechanism depends heavily on estimates of the own- and cross-price elasticities of aggregate electricity demand. This work makes a valuable contribution by synthesizing information from research in power market economics, power system reliability, and environmental impact assessment, to develop a comprehensive methodology for analyzing wind power in the context of long-term energy planning.

  6. An Analytical Planning Model to Estimate the Optimal Density of Charging Stations for Electric Vehicles.

    PubMed

    Ahn, Yongjun; Yeo, Hwasoo

    2015-01-01

    The charging infrastructure location problem is becoming more significant due to the extensive adoption of electric vehicles. Efficient charging station planning can solve deeply rooted problems, such as driving-range anxiety and the stagnation of new electric vehicle consumers. In the initial stage of introducing electric vehicles, the allocation of charging stations is difficult to determine due to the uncertainty of candidate sites and unidentified charging demands, which are determined by diverse variables. This paper introduces the Estimating the Required Density of EV Charging (ERDEC) stations model, which is an analytical approach to estimating the optimal density of charging stations for certain urban areas, which are subsequently aggregated to city level planning. The optimal charging station's density is derived to minimize the total cost. A numerical study is conducted to obtain the correlations among the various parameters in the proposed model, such as regional parameters, technological parameters and coefficient factors. To investigate the effect of technological advances, the corresponding changes in the optimal density and total cost are also examined by various combinations of technological parameters. Daejeon city in South Korea is selected for the case study to examine the applicability of the model to real-world problems. With real taxi trajectory data, the optimal density map of charging stations is generated. These results can provide the optimal number of chargers for driving without driving-range anxiety. In the initial planning phase of installing charging infrastructure, the proposed model can be applied to a relatively extensive area to encourage the usage of electric vehicles, especially areas that lack information, such as exact candidate sites for charging stations and other data related with electric vehicles. The methods and results of this paper can serve as a planning guideline to facilitate the extensive adoption of electric vehicles.

  7. Towards cost-effective reliability through visualization of the reliability option space

    NASA Technical Reports Server (NTRS)

    Feather, Martin S.

    2004-01-01

    In planning a complex system's development there can be many options to improve its reliability. Typically their sum total cost exceeds the budget available, so it is necessary to select judiciously from among them. Reliability models can be employed to calculate the cost and reliability implications of a candidate selection.

  8. Smart Grid Demonstration Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miller, Craig; Carroll, Paul; Bell, Abigail

    The National Rural Electric Cooperative Association (NRECA) organized the NRECA-U.S. Department of Energy (DOE) Smart Grid Demonstration Project (DE-OE0000222) to install and study a broad range of advanced smart grid technologies in a demonstration that spanned 23 electric cooperatives in 12 states. More than 205,444 pieces of electronic equipment and more than 100,000 minor items (bracket, labels, mounting hardware, fiber optic cable, etc.) were installed to upgrade and enhance the efficiency, reliability, and resiliency of the power networks at the participating co-ops. The objective of this project was to build a path for other electric utilities, and particularly electrical cooperatives,more » to adopt emerging smart grid technology when it can improve utility operations, thus advancing the co-ops’ familiarity and comfort with such technology. Specifically, the project executed multiple subprojects employing a range of emerging smart grid technologies to test their cost-effectiveness and, where the technology demonstrated value, provided case studies that will enable other electric utilities—particularly electric cooperatives— to use these technologies. NRECA structured the project according to the following three areas: Demonstration of smart grid technology; Advancement of standards to enable the interoperability of components; and Improvement of grid cyber security. We termed these three areas Technology Deployment Study, Interoperability, and Cyber Security. Although the deployment of technology and studying the demonstration projects at coops accounted for the largest portion of the project budget by far, we see our accomplishments in each of the areas as critical to advancing the smart grid. All project deliverables have been published. Technology Deployment Study: The deliverable was a set of 11 single-topic technical reports in areas related to the listed technologies. Each of these reports has already been submitted to DOE, distributed to co-ops, and posted for universal access at www.nreca.coop/smartgrid. This research is available for widespread distribution to both cooperative members and non-members. These reports are listed in Table 1.2. Interoperability: The deliverable in this area was the advancement of the MultiSpeak™ interoperability standard from version 4.0 to version 5.0, and improvement in the MultiSpeak™ documentation to include more than 100 use cases. This deliverable substantially expanded the scope and usability of MultiSpeak, ™ the most widely deployed utility interoperability standard, now in use by more than 900 utilities. MultiSpeak™ documentation can be accessed only at www.multispeak.org. Cyber Security: NRECA’s starting point was to develop cyber security tools that incorporated succinct guidance on best practices. The deliverables were: cyber security extensions to MultiSpeak,™ which allow more security message exchanges; a Guide to Developing a Cyber Security and Risk Mitigation Plan; a Cyber Security Risk Mitigation Checklist; a Cyber Security Plan Template that co-ops can use to create their own cyber security plans; and Security Questions for Smart Grid Vendors.« less

  9. 75 FR 78979 - Application to Export Electric Energy; Twin Rivers Paper Company Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-17

    .... Twin Rivers has requested an export authorization in order to be able to supply emergency power as... proposed action will not adversely impact on the reliability of the U.S. electric power supply system... electric energy from the United States to Canada pursuant to section 202(e) of the Federal Power Act. DATES...

  10. 75 FR 23823 - Sixth Northwest Electric Power and Conservation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-04

    ... and development; a methodology for determining quantifiable environmental costs and benefits; a 20... December 2007, and in September 2009, the Council released for public review and comment the Draft Northwest Sixth Electric Power and Conservation Plan. During the comment period, the Council held public...

  11. Electrical Sensing Devices.

    ERIC Educational Resources Information Center

    Montana State Univ., Bozeman. Dept. of Agricultural and Industrial Education.

    This unit of instruction on electrical sensing devices is designed especially for use with freshman vocational agriculture students. A unit plan discusses the general aims and goals, lesson titles, student and teacher activities, and references. The unit consists of four lessons. A lesson plan for each lesson provides these components: need;…

  12. Northeast Inspection Services, Inc. boresonic inspection system evaluation. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nottingham, L.D.; Sabourin, P.F.; Presson, J.H.

    1993-04-01

    Turbine rotor reliability and remaining life assessment are continuing concerns to electric utilities. Over the years, boresonic inspection and evaluation have served as primary components in rotor remaining life assessment. Beginning with an evaluation of TREES by EPRI in 1982, a series of reports that document the detection and sizing capabilities of several boresonic systems have been made available. These studies should provide utilities with a better understanding of system performance and lead to improved reliability when predicting rotor remaining life. In 1990, the procedures followed for evaluating rotor boresonic performance capabilities were changed to transfer a greater portion ofmore » the data analysis function to the participating vendor. This change from previous policy was instituted so that the evaluation results would better reflect the ``final answer`` that a vendor would provide in a real rotor inspection and also to reduce the cost of an evaluation. Among the first vendors to participate in the new performance demonstration was Northeast Inspection Services, Inc. (NISI). The tests reported herein were conducted by NISI personnel under the guidelines of the new plan. Details of the new evaluation plan are also presented. Rotor bore blocks containing surface-connected fatigue cracks, embedded glass beads, and embedded radial-axial oriented disks were used in the evaluation. Data were collected during twenty-five independent passes through the blocks. The evaluation consisted of statistical characterization of the detection capabilities, flaw sizing and location accuracy, and repeatability of the inspection system. The results of the evaluation are included in this report.« less

  13. The franchise bottleneck

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fairman, J.F.

    Franchise terms can shape the structure and direction for much of the electricity industry`s future. The electricity distribution franchise can become a wide-mouth jar quenching the large retail customers` thirst for low-cost, reliable energy - or a bottleneck for captive customers.

  14. 75 FR 65312 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-22

    ...: Request for Reauthorization and Extension of Existing Blanket Authorization to Acquire Securities under.... Applicants: Western Electricity Coordinating Council. Description: Notice of Proposed Cancellation of Western Electricity Coordinating Council's Reliability Management System. Filed Date: 10/12/2010. Accession Number...

  15. Battery cycling and calendar aging: year one testing results.

    DOT National Transportation Integrated Search

    2016-07-01

    This report is meant to provide an update on the ongoing battery testing performed by the Hawaii Natural Energy Institute to evaluate Electric Vehicle (EV) battery durability and reliability under electric utility grid operations. Commercial EV batte...

  16. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sheaffer, P.; Lemar, P.; Honton, E. J.

    The Universal Interconnection Technology (UIT) Workshop - sponsored by the U.S. Department of Energy, Distributed Energy and Electric Reliability (DEER) Program, and Distribution and Interconnection R&D - was held July 25-26, 2002, in Chicago, Ill., to: (1) Examine the need for a modular universal interconnection technology; (2) Identify UIT functional and technical requirements; (3) Assess the feasibility of and potential roadblocks to UIT; (4) Create an action plan for UIT development. These proceedings begin with an overview of the workshop. The body of the proceedings provides a series of industry representative-prepared papers on UIT functions and features, present interconnection technology,more » approaches to modularization and expandability, and technical issues in UIT development as well as detailed summaries of group discussions. Presentations, a list of participants, a copy of the agenda, and contact information are provided in the appendices of this document.« less

  17. In-orbit assembly mission for the Space Solar Power Station

    NASA Astrophysics Data System (ADS)

    Cheng, ZhengAi; Hou, Xinbin; Zhang, Xinghua; Zhou, Lu; Guo, Jifeng; Song, Chunlin

    2016-12-01

    The Space Solar Power Station (SSPS) is a large spacecraft that utilizes solar power in space to supply power to an electric grid on Earth. A large symmetrical integrated concept has been proposed by the China Academy of Space Technology (CAST). Considering its large scale, the SSPS requires a modular design and unitized general interfaces that would be assembled in orbit. Facilities system supporting assembly procedures, which include a Reusable Heavy Lift Launch Vehicle, orbital transfer and space robots, is introduced. An integrated assembly scheme utilizing space robots to realize this platform SSPS concept is presented. This paper tried to give a preliminary discussion about the minimized time and energy cost of the assembly mission under best sequence and route This optimized assembly mission planning allows the SSPS to be built in orbit rapidly, effectively and reliably.

  18. Calibrating Parameters of Power System Stability Models using Advanced Ensemble Kalman Filter

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Huang, Renke; Diao, Ruisheng; Li, Yuanyuan

    With the ever increasing penetration of renewable energy, smart loads, energy storage, and new market behavior, today’s power grid becomes more dynamic and stochastic, which may invalidate traditional study assumptions and pose great operational challenges. Thus, it is of critical importance to maintain good-quality models for secure and economic planning and real-time operation. Following the 1996 Western Systems Coordinating Council (WSCC) system blackout, North American Electric Reliability Corporation (NERC) and Western Electricity Coordinating Council (WECC) in North America enforced a number of policies and standards to guide the power industry to periodically validate power grid models and calibrate poor parametersmore » with the goal of building sufficient confidence in model quality. The PMU-based approach using online measurements without interfering with the operation of generators provides a low-cost alternative to meet NERC standards. This paper presents an innovative procedure and tool suites to validate and calibrate models based on a trajectory sensitivity analysis method and an advanced ensemble Kalman filter algorithm. The developed prototype demonstrates excellent performance in identifying and calibrating bad parameters of a realistic hydro power plant against multiple system events.« less

  19. Towards smart energy systems: application of kernel machine regression for medium term electricity load forecasting.

    PubMed

    Alamaniotis, Miltiadis; Bargiotas, Dimitrios; Tsoukalas, Lefteri H

    2016-01-01

    Integration of energy systems with information technologies has facilitated the realization of smart energy systems that utilize information to optimize system operation. To that end, crucial in optimizing energy system operation is the accurate, ahead-of-time forecasting of load demand. In particular, load forecasting allows planning of system expansion, and decision making for enhancing system safety and reliability. In this paper, the application of two types of kernel machines for medium term load forecasting (MTLF) is presented and their performance is recorded based on a set of historical electricity load demand data. The two kernel machine models and more specifically Gaussian process regression (GPR) and relevance vector regression (RVR) are utilized for making predictions over future load demand. Both models, i.e., GPR and RVR, are equipped with a Gaussian kernel and are tested on daily predictions for a 30-day-ahead horizon taken from the New England Area. Furthermore, their performance is compared to the ARMA(2,2) model with respect to mean average percentage error and squared correlation coefficient. Results demonstrate the superiority of RVR over the other forecasting models in performing MTLF.

  20. Unlocking Flexibility: Energy Systems Integration [Guest Editorial

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    O'Malley, Mark; Kroposki, Benjamin

    2017-01-01

    The articles in this special section focus on energy systems integration (ESI). Electric power systems around the world are experiencing great changes, including the retirement of coal and nuclear plants along with a rapid increase in the use of natural gas turbines and variable renewable technologies such as wind and solar. There is also much more use of information and communications technologies to enhance the visibility and controllability of the grid. Flexibility of operation, the ability of a power system to respond to change in demand and supply, is critical to enable higher levels of variable generation. One way tomore » unlock this potential flexibility is to tap into other energy domains. This concept of interconnecting energy domains is called ESI. ESI is the process of coordinating the operation and planning of energy systems across multiple pathways and/or geographical scales to deliver reliable, cost-effective energy services with minimal impact on the environment. Integrating energy domains adds flexibility to the electrical power system. ESI includes interactions among energy vectors and with other large-scale infrastructures including water, transport, and data and communications networks, which are an enabling technology for ESI.« less

Top