46 CFR 188.25-1 - Electrical engineering details.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 7 2012-10-01 2012-10-01 false Electrical engineering details. 188.25-1 Section 188.25... GENERAL PROVISIONS General Electrical Engineering Requirements § 188.25-1 Electrical engineering details. (a) The electrical engineering details shall be in accordance with subchapter J (Electrical...
46 CFR 188.25-1 - Electrical engineering details.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Electrical engineering details. 188.25-1 Section 188.25... GENERAL PROVISIONS General Electrical Engineering Requirements § 188.25-1 Electrical engineering details. (a) The electrical engineering details shall be in accordance with subchapter J (Electrical...
46 CFR 188.25-1 - Electrical engineering details.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 7 2014-10-01 2014-10-01 false Electrical engineering details. 188.25-1 Section 188.25... GENERAL PROVISIONS General Electrical Engineering Requirements § 188.25-1 Electrical engineering details. (a) The electrical engineering details shall be in accordance with subchapter J (Electrical...
46 CFR 188.25-1 - Electrical engineering details.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false Electrical engineering details. 188.25-1 Section 188.25... GENERAL PROVISIONS General Electrical Engineering Requirements § 188.25-1 Electrical engineering details. (a) The electrical engineering details shall be in accordance with subchapter J (Electrical...
46 CFR 188.25-1 - Electrical engineering details.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 7 2011-10-01 2011-10-01 false Electrical engineering details. 188.25-1 Section 188.25... GENERAL PROVISIONS General Electrical Engineering Requirements § 188.25-1 Electrical engineering details. (a) The electrical engineering details shall be in accordance with subchapter J (Electrical...
78 FR 72552 - Airworthiness Directives; General Electric Company Turbofan Engines
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-03
... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA... General Electric Company model GEnx-2B67 and GEnx-2B67B turbofan engines. This AD was prompted by the... certain serial number General Electric Company (GE) model GEnx-2B67 and GEnx-2B67B turbofan engines. The...
78 FR 56594 - Airworthiness Directives; General Electric Company Turbofan Engines
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-13
... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA... General Electric Company (GE) GE90-76B, -85B, -90B, -94B, -110B1, and - 115B turbofan engines. This AD was...) Applicability This AD applies to General Electric Company (GE): (1) GE90-76B, -85B, -90B, and -94B turbofan...
78 FR 76045 - Airworthiness Directives; General Electric Company Turbofan Engines
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-16
... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA... (AD) for General Electric Company (GE) GE90-110B1 and GE90-115B turbofan engines with certain high... turbofan engines with high pressure compressor (HPC) rotor stage 2-5 spools, part numbers (P/Ns) 351-103...
78 FR 72567 - Airworthiness Directives; General Electric Company Turbofan Engines
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-03
... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA... General Electric Company (GE) GE90-110B1 and -115B turbofan engines. This AD was prompted by multiple... turbofan engines with variable bypass valve (VBV) actuator fuel supply tube, part number (P/N) 2165M22P01...
78 FR 38195 - Airworthiness Directives; General Electric Company Turbofan Engines
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-26
... Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA), DOT... all General Electric Company (GE) GE90-110B1 and GE90-115B turbofan engines. This emergency AD was.... owners and operators of these GE90-110B1 and GE90-115B turbofan engines. This action was prompted by...
78 FR 24671 - Airworthiness Directives; General Electric Company Turbofan Engines
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-26
... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA... certain General Electric Company (GE) CF6-80C2 series turbofan engines. That AD currently requires.../B1F/B2F/B4F/B6F/B7F/D1F turbofan engines with any of the following installed: (1) Fuel tube, part...
78 FR 47534 - Airworthiness Directives; General Electric Company Turbofan Engines
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-06
... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA... directive (AD) 2013-14-51 for General Electric Company (GE) GE90-110B1 and GE90-115B turbofan engines with... all known U.S. owners and operators of GE90-110B1 and GE90-115B turbofan engines. AD 2013-14-51...
78 FR 50320 - Airworthiness Directives; General Electric Company Turbofan Engines
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-19
... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA... Electric Company (GE) model GEnx-2B67B turbofan engines with booster anti-ice (BAI) air duct, part number...-2B67 turbofan engine be removed from the Applicability section of this AD. The commenters noted that...
77 FR 3088 - Airworthiness Directives; General Electric Company Turbofan Engines
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-23
... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA... Electric Company (GE) CF34-10E series turbofan engines. This AD was prompted by a report of heavy wear... turbofan engines installed on airplanes of U.S. registry. We also estimate that it will take about 8 work...
46 CFR 70.25-1 - Electrical engineering details.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 3 2013-10-01 2013-10-01 false Electrical engineering details. 70.25-1 Section 70.25-1... General Electrical Engineering Requirements § 70.25-1 Electrical engineering details. All electrical engineering details and installations shall be designed and installed in accordance with subchapter J...
46 CFR 70.25-1 - Electrical engineering details.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 3 2010-10-01 2010-10-01 false Electrical engineering details. 70.25-1 Section 70.25-1... General Electrical Engineering Requirements § 70.25-1 Electrical engineering details. All electrical engineering details and installations shall be designed and installed in accordance with subchapter J...
46 CFR 90.25-1 - Electrical engineering details.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Electrical engineering details. 90.25-1 Section 90.25-1... PROVISIONS General Electrical Engineering Requirements § 90.25-1 Electrical engineering details. (a) All electrical engineering details and installations shall be designed and installed in accordance with...
46 CFR 90.25-1 - Electrical engineering details.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Electrical engineering details. 90.25-1 Section 90.25-1... PROVISIONS General Electrical Engineering Requirements § 90.25-1 Electrical engineering details. (a) All electrical engineering details and installations shall be designed and installed in accordance with...
46 CFR 70.25-1 - Electrical engineering details.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 3 2011-10-01 2011-10-01 false Electrical engineering details. 70.25-1 Section 70.25-1... General Electrical Engineering Requirements § 70.25-1 Electrical engineering details. All electrical engineering details and installations shall be designed and installed in accordance with subchapter J...
46 CFR 70.25-1 - Electrical engineering details.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 3 2014-10-01 2014-10-01 false Electrical engineering details. 70.25-1 Section 70.25-1... General Electrical Engineering Requirements § 70.25-1 Electrical engineering details. All electrical engineering details and installations shall be designed and installed in accordance with subchapter J...
46 CFR 70.25-1 - Electrical engineering details.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 3 2012-10-01 2012-10-01 false Electrical engineering details. 70.25-1 Section 70.25-1... General Electrical Engineering Requirements § 70.25-1 Electrical engineering details. All electrical engineering details and installations shall be designed and installed in accordance with subchapter J...
46 CFR 90.25-1 - Electrical engineering details.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Electrical engineering details. 90.25-1 Section 90.25-1... PROVISIONS General Electrical Engineering Requirements § 90.25-1 Electrical engineering details. (a) All electrical engineering details and installations shall be designed and installed in accordance with...
46 CFR 90.25-1 - Electrical engineering details.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Electrical engineering details. 90.25-1 Section 90.25-1... PROVISIONS General Electrical Engineering Requirements § 90.25-1 Electrical engineering details. (a) All electrical engineering details and installations shall be designed and installed in accordance with...
46 CFR 90.25-1 - Electrical engineering details.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Electrical engineering details. 90.25-1 Section 90.25-1... PROVISIONS General Electrical Engineering Requirements § 90.25-1 Electrical engineering details. (a) All electrical engineering details and installations shall be designed and installed in accordance with...
78 FR 19983 - Airworthiness Directives; General Electric Company Turbofan Engines
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-03
... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA... Electric Company (GE) CF34-8C and CF34-8E turbofan engines with certain part numbers (P/N) of operability...-8E6, and CF34-8E6A1 turbofan engines, with an operability bleed valve (OBV) part number (P/N...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-18
... Airworthiness Directives; General Electric Company CF6-45 and CF6-50 Series Turbofan Engines AGENCY: Federal... airworthiness directive (AD) for General Electric Company (GE) CF6-45 and CF6-50 series turbofan engines. That..., and MD-10- 30F. The commenter stated that the proposed AD only listed these airplanes as a series. We...
China’s Aerospace Industry: Technology, Funding and Modernization
1992-01-01
7 was to use a General Electric F404 engine (from the F-20 Tigershark) along with other foreign engines as candidates but that program was again...firms like General Electric and Pratt & Whitney. As the Chinese engine industry gets more behind, more foreign engines are chosen, and the factories have... Electric since 1984.81 Liming Engine Plant makes compressor disks and turbine disks for GE and turbine disks for Pratt & Whitney while the Chengdu Engine
1946-11-18
INVESTIGATION OF THE GENERAL ELECTRIC 1-40 JET -PROPULSION ENGINE IN THE CLEVELAND ALTITUDE WIND TUNNEL .; II - ANALYSIS OF COMPRESSOR PERFORMANCE...CHARACTERISTICS By Robert 0. Dietz, Jr. and Robert M. Gelsenheyner Aircraft Engine Research Laboratory 1 Cleveland, Ohio !f -NOT FM ED", P 0 W DESTROY...Command, Army Air Forces INVESTIGATION OF THE GENERAL ELECTRIC 1-40 JET -PROPULSION ENGINE IN THE CLEVELAND ALTITUDE WIND TUNNEL II - ANALYSIS OF
76 FR 68634 - Airworthiness Directives; General Electric Company (GE) CF6 Turbofan Engines
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-07
... Airworthiness Directives; General Electric Company (GE) CF6 Turbofan Engines AGENCY: Federal Aviation... ``(c) This AD applies to * * * and CF6-80A3 turbofan engines with left-hand links * * *.'' to ``(c) This AD applies to * * * and CF6-80A3 turbofan engines, including engines marked on the engine data...
76 FR 64844 - Airworthiness Directives; General Electric Company Turbofan Engines
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-19
... Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of proposed... General Electric Company (GE) CF6-45 and CF6-50 series turbofan engines with certain low-pressure turbine... series turbofan engines with certain LPT rotor stage 3 disks installed. That AD requires initial and...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-23
... Airworthiness Directives; General Electric Company (GE) CJ610 Series Turbojet Engines and CF700 Series Turbofan... adopting a new airworthiness directive (AD) for GE CJ610 series turbojet engines and CF700 turbofan engines... part 39 with a proposed AD. The proposed AD applies to GE CJ610 series turbojet engines and CF700...
77 FR 58471 - Airworthiness Directives; General Electric Company Turbofan Engines
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-21
... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA.../P1, GEnx-1B75/P1, GEnx- 2B67, and GEnx-2B67B turbofan engines. This AD requires initial and... this AD will affect 11 GE GEnx turbofan engines installed on airplanes of U.S. registry. We also...
Cost Effective Repair Techniques for Turbine Airfoils. Volume 2
1979-04-01
BLADES , *GUIDE VANES , *REPAIR, TURBOFAN ENGINES , DIFFUSION BONDING, COST EFFECTIVENESS Identifiers: (U) * Turbine vanes , TF-39 engines , Activated...REPAIR TECHNIQUES FOR TURBINE AIRFOILS J. A. WEIN W. R. YOUNG GENERAL ELECTRIC COMPANY AIRCRAFT ENGINE GROUP CINCINNATI, OHIO 45215 APRIL 1979...Author: GENERAL ELECTRIC CO CINCINNATI OH AIRCRAFT ENGINE BUSINESS GROUP Unclassified Title: (U) Cost Effective Repair Techniques for
Code of Federal Regulations, 2011 CFR
2011-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-1 General. (a) Electric installations on vessels must ensure: (1) Maintenance of services... persons, and the vessel from electrical hazards. (3) Maintenance of system integrity through compliance...
Code of Federal Regulations, 2014 CFR
2014-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-1 General. (a) Electric installations on vessels must ensure: (1) Maintenance of services... persons, and the vessel from electrical hazards. (3) Maintenance of system integrity through compliance...
Code of Federal Regulations, 2010 CFR
2010-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-1 General. (a) Electric installations on vessels must ensure: (1) Maintenance of services... persons, and the vessel from electrical hazards. (3) Maintenance of system integrity through compliance...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-20
... Frost, Aerospace Engineer, Engine Certification Office, FAA, Engine & Propeller Directorate, 12 New..., Massachusetts, on May 10, 2010. Peter A. White, Assistant Manager, Engine and Propeller Directorate, Aircraft... Airworthiness Directives; General Electric Company CF34-1A, -3A, -3A1, -3A2, -3B, and -3B1 Turbofan Engines...
77 FR 48110 - Airworthiness Directives; General Electric Company Turbofan Engines
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-13
... Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of proposed... certain General Electric Company (GE) CF6-80C2 series turbofan engines. The existing AD requires... 2000-04-14, Amendment 39-11597 (65 FR 10698, February 29, 2000), for all GE CF6-80C2 series turbofan...
77 FR 76977 - Airworthiness Directives; General Electric Company Turbofan Engines
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-31
... Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Supplemental notice... proposed airworthiness directive (AD) for certain General Electric Company (GE) CF6-80C2 series turbofan... part 39 to include an AD that would apply to certain GE CF6-80C2 series turbofan engines. That NPRM...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-30
..., Aerospace Engineer, Engine Certification Office, FAA, Engine & Propeller Directorate, 12 New England... Directives; General Electric Company (GE) CF34-1A, CF34-3A, and CF34-3B Series Turbofan Engines; Correction... to GE CF34-1A, CF34-3A, and CF34-3B series turbofan engines. The docket number is incorrect in all...
MTR BASEMENT. GENERAL ELECTRIC CONTROL CONSOLE FOR AIRCRAFT NUCLEAR PROPULSION ...
MTR BASEMENT. GENERAL ELECTRIC CONTROL CONSOLE FOR AIRCRAFT NUCLEAR PROPULSION EXPERIMENT NO. 1. INL NEGATIVE NO. 6510. Unknown Photographer, 9/29/1959 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
46 CFR 111.95-3 - General requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false General requirements. 111.95-3 Section 111.95-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-3 General requirements. (a) Each electrical...
46 CFR 111.95-3 - General requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false General requirements. 111.95-3 Section 111.95-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-3 General requirements. (a) Each electrical...
46 CFR 111.95-3 - General requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false General requirements. 111.95-3 Section 111.95-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-3 General requirements. (a) Each electrical...
46 CFR 111.95-3 - General requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false General requirements. 111.95-3 Section 111.95-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-3 General requirements. (a) Each electrical...
46 CFR 111.95-3 - General requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false General requirements. 111.95-3 Section 111.95-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-3 General requirements. (a) Each electrical...
46 CFR 111.87-3 - General requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false General requirements. 111.87-3 Section 111.87-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Air Heating Equipment § 111.87-3 General requirements. (a) Each electric heater must meet...
46 CFR 111.87-3 - General requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false General requirements. 111.87-3 Section 111.87-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Air Heating Equipment § 111.87-3 General requirements. (a) Each electric heater must meet...
46 CFR 111.87-3 - General requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false General requirements. 111.87-3 Section 111.87-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Air Heating Equipment § 111.87-3 General requirements. (a) Each electric heater must meet...
46 CFR 111.87-3 - General requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false General requirements. 111.87-3 Section 111.87-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Air Heating Equipment § 111.87-3 General requirements. (a) Each electric heater must meet...
46 CFR 111.87-3 - General requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false General requirements. 111.87-3 Section 111.87-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Air Heating Equipment § 111.87-3 General requirements. (a) Each electric heater must meet...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hirschkron, R.; Davis, R.H.; Warren, R.E.
1979-04-30
This study developed data on General Electric common core derivative engines for use in Maritime Patrol Aircraft (MPA) concept formulation studies. The study included the screening of potential General Electric turbofan and turboprop/turboshaft engines and the preparation of technical and planning information on three of the most promising engine candidates. Screening of General Electric derivative candidates was performed utilizing an analytical MPA model using synthesized mission profiles to rank the candidates in terms of fuel consumption, weight, cost and complexity. The three turboprop engines selected for further study were as follows: TF34 growth derivative version with boost and new LPTmore » (TF34/T7 Study A1), F404 derivative with booster stages and new LPT (F404/T1 Study A1), and GE27 scaled and boosted study engine (GE27/T3 Study A1). Volume I summarizes the screening analysis and contains technical, planning, installation, cost and development data for the three selected turboprop engines. Volumes II, III and IV of this report contain the detailed performance data estimates for the GE27/T3 Study A1, TF34/T7 Study A1 and F404/T1 Study A1 turboprop engines, respectively.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hirschkron, R.; Davis, R.H.; Warren, R.E.
1979-04-30
This study developed data on General Electric common core derivative engines for use in Maritime Patrol Aircraft (MPA) concept formulation studies. The study included the screening of potential General Electric turbofan and turboprop/turboshaft engines and the preparation of technical and planning information on three of the most promising engine candidates. Screening of General Electric derivative candidates was performed utilizing an analytical MPA model using synthesized mission profiles to rank the candidates in terms of fuel consumption, weight, cost and complexity. The three turboprop engines selected for further study were as follows: TF34 growth derivative version with boost and new LPTmore » (TF34/T7 Study A1), F404 derivative with booster stages and new LPT (F404/T1 Study A1), and GE27 scaled and boosted study engine (GE27/T3 Study A1). Volume I summarizes the screening analysis and contains technical, planning, installation, cost and development data for the three selected turboprop engines. Volumes II, III and IV of this report contain the detailed performance data estimates for the GE27/T3 Study A1, TF34/T7 Study A1 and F404/T1 Study A1 turboprop engines, respectively.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hirschkron, R.; Davis, R.H.; Warren, R.E.
1979-04-30
This study developed data on General Electric common core derivative engines for use in Maritime Patrol Aircraft (MPA) concept formulation studies. The study included the screening of potential General Electric turbofan and turboprop/turboshaft engines and the preparation of technical and planning information on three of the most promising engine candidates. Screening of General Electric derivative candidates was performed utilizing an analytical MPA model using synthesized mission profiles to rank the candidates in terms of fuel consumption, weight, cost and complexity. The three turboprop engines selected for further study were as follows: TF34 growth derivative version with boost and new LPTmore » (TF34/T7 Study A1), F404 derivative with booster stages and new LPT (F404/T1 Study A1), and GE27 scaled and boosted study engine (GE27/T3 Study A1). Volume I summarizes the screening analysis and contains technical, planning, installation, cost and development data for the three selected turboprop engines. Volumes II, III and IV of this report contain the detailed performance data estimates for the GE27/T3 Study A1, TF34/T7 Study A1 and F404/T1 Study A1 turboprop engines, respectively.« less
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false General. 111.01-1 Section 111.01-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-1 General. (a) Electric installations on vessels must ensure: (1) Maintenance of services...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false General. 111.01-1 Section 111.01-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-1 General. (a) Electric installations on vessels must ensure: (1) Maintenance of services...
Code of Federal Regulations, 2010 CFR
2010-01-01
... ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES Electric System Planning... long-term needs for plant additions, improvements, replacements, and retirements for their electric systems. The primary components of the planning system consist of long-range engineering plans and...
Energy Efficient Engine: Control system component performance report
NASA Technical Reports Server (NTRS)
Beitler, R. S.; Bennett, G. W.
1984-01-01
An Energy Efficient Engine (E3) program was established to develop technology for improving the energy efficiency of future commercial transport aircraft engines. As part of this program, General Electric designed and tested a new engine. The design, fabrication, bench and engine testing of the Full Authority Digital Electronic Control (FADEC) system used for controlling the E3 Demonstrator Engine is described. The system design was based on many of the proven concepts and component designs used on the General Electric family of engines. One significant difference is the use of the FADEC in place of hydromechanical computation currently used.
1975-10-01
AO-AUHb b27 UNCLASSIFIED GENERAL ELECTRIC CO CINCINNATI OHIO AIRCRAFT ENGINE GROUP F/G 2l/5 DEVELOPMENT OF EMISSIONS MEASUREMENT TECHNIQUES FOR...Colley D.R. Ferguson M.A. Smith GENERAL ELECTRIC COMPANY Aircraft Engine Group Cincinnati, Ohio 45215 October 1975 Technical Report AFAPL-TR-7 5-52...Service (NTIS). At NTIS, it will be avail’ able to the general public, including foreign nations. This technical report has been reviewed and is
Code of Federal Regulations, 2011 CFR
2011-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Applicability § 110.01-1 General. (a) This subchapter applies to all electrical installations on vessels subject to... electrical installation to be in accordance with this subchapter. (b) This subchapter applies only to...
Code of Federal Regulations, 2014 CFR
2014-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Applicability § 110.01-1 General. (a) This subchapter applies to all electrical installations on vessels subject to... electrical installation to be in accordance with this subchapter. (b) This subchapter applies only to...
Code of Federal Regulations, 2010 CFR
2010-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Applicability § 110.01-1 General. (a) This subchapter applies to all electrical installations on vessels subject to... electrical installation to be in accordance with this subchapter. (b) This subchapter applies only to...
46 CFR 111.01-9 - Degrees of protection.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-9 Degrees of protection. (a) Interior electrical equipment exposed... service intended. (b) Electrical equipment in locations requiring exceptional degrees of protection as...
46 CFR 111.01-9 - Degrees of protection.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-9 Degrees of protection. (a) Interior electrical equipment exposed... service intended. (b) Electrical equipment in locations requiring exceptional degrees of protection as...
46 CFR 111.01-19 - Inclination of the vessel.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-19 Inclination of the vessel. (a) All electrical equipment must be.... Additionally, electrical equipment necessary for the maneuvering, navigation, and safety of the vessel or its...
46 CFR 111.01-19 - Inclination of the vessel.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-19 Inclination of the vessel. (a) All electrical equipment must be.... Additionally, electrical equipment necessary for the maneuvering, navigation, and safety of the vessel or its...
46 CFR 111.01-19 - Inclination of the vessel.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-19 Inclination of the vessel. (a) All electrical equipment must be.... Additionally, electrical equipment necessary for the maneuvering, navigation, and safety of the vessel or its...
46 CFR 111.01-19 - Inclination of the vessel.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-19 Inclination of the vessel. (a) All electrical equipment must be.... Additionally, electrical equipment necessary for the maneuvering, navigation, and safety of the vessel or its...
78 FR 44899 - Airworthiness Directives; General Electric Company Turbofan Engines
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-25
... Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of proposed... Electric Company (GE) GE90-110B1 and -115B turbofan engines. This proposed AD was prompted by multiple...) 2165M22P01, installed on GE90-110B1 and -115B turbofan engines. One of the leaks led to an under cowl engine...
Mechanic watches a General Electric I-40 Engine Fire
1948-01-21
A mechanic watches the firing of a General Electric I-40 turbojet at the National Advisory Committee for Aeronautics (NACA) Lewis Flight Propulsion Laboratory. The military selected General Electric’s West Lynn facility in 1941 to secretly replicate the centrifugal turbojet engine designed by British engineer Frank Whittle. General Electric’s first attempt, the I-A, was fraught with problems. The design was improved somewhat with the subsequent I-16 engine. It was not until the engine's next reincarnation as the I-40 in 1943 that General Electric’s efforts paid off. The 4000-pound thrust I-40 was incorporated into the Lockheed Shooting Star airframe and successfully flown in June 1944. The Shooting Star became the US’s first successful jet aircraft and the first US aircraft to reach 500 miles per hour. NACA Lewis studied all of General Electric’s centrifugal turbojet models during the 1940s. In 1945 the entire Shooting Star aircraft was investigated in the Altitude Wind Tunnel. Engine compressor performance and augmentation by water injection; comparison of different fuel blends in a single combustor; and air-cooled rotors were studied. The mechanic in this photograph watches the firing of a full-scale I-40 in the Jet Propulsion Static Laboratory. The facility was quickly built in 1943 specifically in order to test the early General Electric turbojets. The I-A was secretly analyzed in the facility during the fall of 1943.
46 CFR 111.97-3 - General requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-3 General requirements. Each watertight door operating system must meet Subpart H, § 170.270 of this chapter. [CGD 74-125A, 47 FR 15236, Apr. 8...
46 CFR 111.97-3 - General requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-3 General requirements. Each watertight door operating system must meet Subpart H, § 170.270 of this chapter. [CGD 74-125A, 47 FR 15236, Apr. 8...
46 CFR 111.97-3 - General requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-3 General requirements. Each watertight door operating system must meet Subpart H, § 170.270 of this chapter. [CGD 74-125A, 47 FR 15236, Apr. 8...
46 CFR 111.97-3 - General requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-3 General requirements. Each watertight door operating system must meet Subpart H, § 170.270 of this chapter. [CGD 74-125A, 47 FR 15236, Apr. 8...
46 CFR 111.97-3 - General requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-3 General requirements. Each watertight door operating system must meet Subpart H, § 170.270 of this chapter. [CGD 74-125A, 47 FR 15236, Apr. 8...
78 FR 19628 - Airworthiness Directives; General Electric Company Turbofan Engines
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-02
... Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of proposed... Electric Company (GE) GE90-76B, -85B, -90B, -94B, - 110B1, and -115B turbofan engines. This proposed AD was... of stage 1 HPT stator shroud distress resulting in engine removals on airplanes with GE90 turbofan...
Code of Federal Regulations, 2010 CFR
2010-01-01
.../Institute of Electrical and Electronics Engineers, Inc. (ANSI/IEEE) C2-1997, National Electrical Safety Code (NESC). The National Electrical Code ® and NEC ® are registered trademarks of the National Fire... have been made by the RUS borrower or the engineer delegated by the RUS borrower. (f) Only a qualified...
Code of Federal Regulations, 2012 CFR
2012-01-01
.../Institute of Electrical and Electronics Engineers, Inc. (ANSI/IEEE) C2-1997, National Electrical Safety Code (NESC). The National Electrical Code ® and NEC ® are registered trademarks of the National Fire... have been made by the RUS borrower or the engineer delegated by the RUS borrower. (f) Only a qualified...
Code of Federal Regulations, 2011 CFR
2011-01-01
.../Institute of Electrical and Electronics Engineers, Inc. (ANSI/IEEE) C2-1997, National Electrical Safety Code (NESC). The National Electrical Code ® and NEC ® are registered trademarks of the National Fire... have been made by the RUS borrower or the engineer delegated by the RUS borrower. (f) Only a qualified...
Code of Federal Regulations, 2013 CFR
2013-01-01
.../Institute of Electrical and Electronics Engineers, Inc. (ANSI/IEEE) C2-1997, National Electrical Safety Code (NESC). The National Electrical Code ® and NEC ® are registered trademarks of the National Fire... have been made by the RUS borrower or the engineer delegated by the RUS borrower. (f) Only a qualified...
Code of Federal Regulations, 2014 CFR
2014-01-01
.../Institute of Electrical and Electronics Engineers, Inc. (ANSI/IEEE) C2-1997, National Electrical Safety Code (NESC). The National Electrical Code ® and NEC ® are registered trademarks of the National Fire... have been made by the RUS borrower or the engineer delegated by the RUS borrower. (f) Only a qualified...
Code of Federal Regulations, 2011 CFR
2011-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Testing and Inspection... vessels in other parts of this chapter. (b) In the inspection of electric equipment and installations, the...) This subpart must not be construed to imply that shop tests or factory inspections of electric...
Code of Federal Regulations, 2014 CFR
2014-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Testing and Inspection... vessels in other parts of this chapter. (b) In the inspection of electric equipment and installations, the...) This subpart must not be construed to imply that shop tests or factory inspections of electric...
Code of Federal Regulations, 2010 CFR
2010-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Testing and Inspection... vessels in other parts of this chapter. (b) In the inspection of electric equipment and installations, the...) This subpart must not be construed to imply that shop tests or factory inspections of electric...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false General. 111.15-1 Section 111.15-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-1 General. Each battery...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false General. 111.15-1 Section 111.15-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-1 General. Each battery...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false General. 111.15-1 Section 111.15-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-1 General. Each battery...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false General. 111.15-1 Section 111.15-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-1 General. Each battery...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false General. 111.15-1 Section 111.15-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-1 General. Each battery...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false General. 111.53-1 Section 111.53-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Fuses § 111.53-1 General. (a) Each fuse must— (1) Meet the general provisions of Article 240 of NFPA NEC...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false General. 111.53-1 Section 111.53-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Fuses § 111.53-1 General. (a) Each fuse must— (1) Meet the general provisions of Article 240 of NFPA NEC...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false General. 111.53-1 Section 111.53-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Fuses § 111.53-1 General. (a) Each fuse must— (1) Meet the general provisions of Article 240 of NFPA NEC...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false General. 111.53-1 Section 111.53-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Fuses § 111.53-1 General. (a) Each fuse must— (1) Meet the general provisions of Article 240 of NFPA NEC...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false General. 111.53-1 Section 111.53-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Fuses § 111.53-1 General. (a) Each fuse must— (1) Meet the general provisions of Article 240 of NFPA NEC...
Real-time simulation of an F110/STOVL turbofan engine
NASA Technical Reports Server (NTRS)
Drummond, Colin K.; Ouzts, Peter J.
1989-01-01
A traditional F110-type turbofan engine model was extended to include a ventral nozzle and two thrust-augmenting ejectors for Short Take-Off Vertical Landing (STOVL) aircraft applications. Development of the real-time F110/STOVL simulation required special attention to the modeling approach to component performance maps, the low pressure turbine exit mixing region, and the tailpipe dynamic approximation. Simulation validation derives by comparing output from the ADSIM simulation with the output for a validated F110/STOVL General Electric Aircraft Engines FORTRAN deck. General Electric substantiated basic engine component characteristics through factory testing and full scale ejector data.
46 CFR 111.01-17 - Voltage and frequency variations.
Code of Federal Regulations, 2013 CFR
2013-10-01
....01-17 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-17 Voltage and frequency variations. Unless otherwise stated, electrical equipment must function at variations of at least ±5 percent of rated frequency...
46 CFR 111.01-17 - Voltage and frequency variations.
Code of Federal Regulations, 2010 CFR
2010-10-01
....01-17 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-17 Voltage and frequency variations. Unless otherwise stated, electrical equipment must function at variations of at least ±5 percent of rated frequency...
46 CFR 111.01-17 - Voltage and frequency variations.
Code of Federal Regulations, 2011 CFR
2011-10-01
....01-17 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-17 Voltage and frequency variations. Unless otherwise stated, electrical equipment must function at variations of at least ±5 percent of rated frequency...
46 CFR 111.01-17 - Voltage and frequency variations.
Code of Federal Regulations, 2012 CFR
2012-10-01
....01-17 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-17 Voltage and frequency variations. Unless otherwise stated, electrical equipment must function at variations of at least ±5 percent of rated frequency...
46 CFR 111.01-17 - Voltage and frequency variations.
Code of Federal Regulations, 2014 CFR
2014-10-01
....01-17 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-17 Voltage and frequency variations. Unless otherwise stated, electrical equipment must function at variations of at least ±5 percent of rated frequency...
ERIC Educational Resources Information Center
Lashof, Judith R.
The Vermont Institute for Self Reliance (VISR) conducted a Basic Educational Skills for Training (BEST) program, a national demonstration project in workplace literacy, from April 1990 to March 1992. BEST provided learner-centered, context-based literacy instruction onsite, on company time, at two General Electric (GE) Aircraft Engines Rutland…
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false General. 111.33-1 Section 111.33-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-1 General. This subpart is applicable to all power...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false General. 111.33-1 Section 111.33-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-1 General. This subpart is applicable to all power...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false General. 111.33-1 Section 111.33-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-1 General. This subpart is applicable to all power...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false General. 111.33-1 Section 111.33-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-1 General. This subpart is applicable to all power...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false General. 110.01-1 Section 110.01-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Applicability § 110.01-1 General. (a) This subchapter applies to all electrical installations on vessels subject to...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false General. 110.01-1 Section 110.01-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Applicability § 110.01-1 General. (a) This subchapter applies to all electrical installations on vessels subject to...
Code of Federal Regulations, 2010 CFR
2010-01-01
... ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES General § 1724.3... authorized assistants and representatives. Engineer means a registered or licensed person, who may be a staff... Government Printing Office. NESC means the National Electrical Safety Code. RE Act means the Rural...
Code of Federal Regulations, 2014 CFR
2014-01-01
... ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES General § 1724.3... authorized assistants and representatives. Engineer means a registered or licensed person, who may be a staff... Government Printing Office. NESC means the National Electrical Safety Code. RE Act means the Rural...
Code of Federal Regulations, 2013 CFR
2013-01-01
... ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES General § 1724.3... authorized assistants and representatives. Engineer means a registered or licensed person, who may be a staff... Government Printing Office. NESC means the National Electrical Safety Code. RE Act means the Rural...
Code of Federal Regulations, 2011 CFR
2011-01-01
... ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES General § 1724.3... authorized assistants and representatives. Engineer means a registered or licensed person, who may be a staff... Government Printing Office. NESC means the National Electrical Safety Code. RE Act means the Rural...
Code of Federal Regulations, 2012 CFR
2012-01-01
... ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES General § 1724.3... authorized assistants and representatives. Engineer means a registered or licensed person, who may be a staff... Government Printing Office. NESC means the National Electrical Safety Code. RE Act means the Rural...
46 CFR 111.01-9 - Degrees of protection.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Degrees of protection. 111.01-9 Section 111.01-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-9 Degrees of protection. (a) Interior electrical equipment exposed...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false General. 111.55-1 Section 111.55-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switches § 111.55-1 General. (a) Each switch must meet Article 404 of NFPA NEC 2002 (incorporated by...
46 CFR 111.25-1 - General requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false General requirements. 111.25-1 Section 111.25-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Motors § 111.25-1 General requirements. The requirements for generators contained in § 111.12-5...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false General. 111.55-1 Section 111.55-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switches § 111.55-1 General. (a) Each switch must meet Article 404 of NFPA NEC 2002 (incorporated by...
46 CFR 111.25-1 - General requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false General requirements. 111.25-1 Section 111.25-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Motors § 111.25-1 General requirements. The requirements for generators contained in § 111.12-5...
46 CFR 111.79-1 - Receptacle outlets; general.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Receptacle outlets; general. 111.79-1 Section 111.79-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Receptacles § 111.79-1 Receptacle outlets; general. (a) There must be a sufficient...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false General. 111.59-1 Section 111.59-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Busways § 111.59-1 General. Each busway must meet Article 368 of NFPA NEC 2002 (incorporated by reference...
46 CFR 111.25-1 - General requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false General requirements. 111.25-1 Section 111.25-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Motors § 111.25-1 General requirements. The requirements for generators contained in § 111.12-5...
46 CFR 111.25-1 - General requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false General requirements. 111.25-1 Section 111.25-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Motors § 111.25-1 General requirements. The requirements for generators contained in § 111.12-5...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false General. 111.52-1 Section 111.52-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Calculation of Short-Circuit Currents § 111.52-1 General. The available short-circuit current must be computed...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false General. 111.52-1 Section 111.52-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Calculation of Short-Circuit Currents § 111.52-1 General. The available short-circuit current must be computed...
46 CFR 111.79-1 - Receptacle outlets; general.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Receptacle outlets; general. 111.79-1 Section 111.79-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Receptacles § 111.79-1 Receptacle outlets; general. (a) There must be a sufficient...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false General. 111.52-1 Section 111.52-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Calculation of Short-Circuit Currents § 111.52-1 General. The available short-circuit current must be computed...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false General. 111.55-1 Section 111.55-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switches § 111.55-1 General. (a) Each switch must meet Article 404 of NFPA NEC 2002 (incorporated by...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false General. 111.55-1 Section 111.55-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switches § 111.55-1 General. (a) Each switch must meet Article 404 of NFPA NEC 2002 (incorporated by...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false General. 111.59-1 Section 111.59-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Busways § 111.59-1 General. Each busway must meet Article 368 of NFPA NEC 2002 (incorporated by reference...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false General. 111.55-1 Section 111.55-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switches § 111.55-1 General. (a) Each switch must meet Article 404 of NFPA NEC 2002 (incorporated by...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false General. 111.52-1 Section 111.52-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Calculation of Short-Circuit Currents § 111.52-1 General. The available short-circuit current must be computed...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false General. 111.59-1 Section 111.59-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Busways § 111.59-1 General. Each busway must meet Article 368 of NFPA NEC 2002 (incorporated by reference...
46 CFR 111.79-1 - Receptacle outlets; general.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Receptacle outlets; general. 111.79-1 Section 111.79-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Receptacles § 111.79-1 Receptacle outlets; general. (a) There must be a sufficient...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false General. 111.59-1 Section 111.59-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Busways § 111.59-1 General. Each busway must meet Article 368 of NFPA NEC 2002 (incorporated by reference...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false General. 111.59-1 Section 111.59-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Busways § 111.59-1 General. Each busway must meet Article 368 of NFPA NEC 2002 (incorporated by reference...
46 CFR 111.25-1 - General requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false General requirements. 111.25-1 Section 111.25-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Motors § 111.25-1 General requirements. The requirements for generators contained in § 111.12-5...
46 CFR 111.79-1 - Receptacle outlets; general.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Receptacle outlets; general. 111.79-1 Section 111.79-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Receptacles § 111.79-1 Receptacle outlets; general. (a) There must be a sufficient...
46 CFR 111.79-1 - Receptacle outlets; general.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Receptacle outlets; general. 111.79-1 Section 111.79-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Receptacles § 111.79-1 Receptacle outlets; general. (a) There must be a sufficient...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false General. 111.52-1 Section 111.52-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Calculation of Short-Circuit Currents § 111.52-1 General. The available short-circuit current must be computed...
46 CFR 111.01-11 - Corrosion-resistant parts.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Corrosion-resistant parts. 111.01-11 Section 111.01-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-11 Corrosion-resistant parts. Each enclosure and part of electric...
46 CFR 111.01-3 - Placement of equipment.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Placement of equipment. 111.01-3 Section 111.01-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-3 Placement of equipment. (a) Electric equipment must be arranged...
46 CFR 111.01-11 - Corrosion-resistant parts.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Corrosion-resistant parts. 111.01-11 Section 111.01-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-11 Corrosion-resistant parts. Each enclosure and part of electric...
46 CFR 111.01-3 - Placement of equipment.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Placement of equipment. 111.01-3 Section 111.01-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-3 Placement of equipment. (a) Electric equipment must be arranged...
46 CFR 111.01-11 - Corrosion-resistant parts.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Corrosion-resistant parts. 111.01-11 Section 111.01-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-11 Corrosion-resistant parts. Each enclosure and part of electric...
46 CFR 111.01-3 - Placement of equipment.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Placement of equipment. 111.01-3 Section 111.01-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-3 Placement of equipment. (a) Electric equipment must be arranged...
46 CFR 111.01-11 - Corrosion-resistant parts.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Corrosion-resistant parts. 111.01-11 Section 111.01-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-11 Corrosion-resistant parts. Each enclosure and part of electric...
46 CFR 111.01-3 - Placement of equipment.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Placement of equipment. 111.01-3 Section 111.01-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-3 Placement of equipment. (a) Electric equipment must be arranged...
46 CFR 111.01-11 - Corrosion-resistant parts.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Corrosion-resistant parts. 111.01-11 Section 111.01-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-11 Corrosion-resistant parts. Each enclosure and part of electric...
46 CFR 111.01-3 - Placement of equipment.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Placement of equipment. 111.01-3 Section 111.01-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-3 Placement of equipment. (a) Electric equipment must be arranged...
Code of Federal Regulations, 2010 CFR
2010-01-01
... (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.46 General. This subpart sets forth RUS policies for minimum insurance requirements for contractors, engineers, and...
Code of Federal Regulations, 2014 CFR
2014-01-01
... (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.46 General. This subpart sets forth RUS policies for minimum insurance requirements for contractors, engineers, and...
Code of Federal Regulations, 2011 CFR
2011-01-01
... (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.46 General. This subpart sets forth RUS policies for minimum insurance requirements for contractors, engineers, and...
Code of Federal Regulations, 2012 CFR
2012-01-01
... (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.46 General. This subpart sets forth RUS policies for minimum insurance requirements for contractors, engineers, and...
Code of Federal Regulations, 2013 CFR
2013-01-01
... (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.46 General. This subpart sets forth RUS policies for minimum insurance requirements for contractors, engineers, and...
46 CFR 111.95-1 - Applicability.
Code of Federal Regulations, 2012 CFR
2012-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-1 Applicability. (a) The electric installation of each electric power-operated boat winch must meet the requirements in this subpart, except that limit...
46 CFR 111.95-1 - Applicability.
Code of Federal Regulations, 2014 CFR
2014-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-1 Applicability. (a) The electric installation of each electric power-operated boat winch must meet the requirements in this subpart, except that limit...
46 CFR 111.95-1 - Applicability.
Code of Federal Regulations, 2013 CFR
2013-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-1 Applicability. (a) The electric installation of each electric power-operated boat winch must meet the requirements in this subpart, except that limit...
46 CFR 111.95-1 - Applicability.
Code of Federal Regulations, 2011 CFR
2011-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-1 Applicability. (a) The electric installation of each electric power-operated boat winch must meet the requirements in this subpart, except that limit...
46 CFR 111.95-1 - Applicability.
Code of Federal Regulations, 2010 CFR
2010-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-1 Applicability. (a) The electric installation of each electric power-operated boat winch must meet the requirements in this subpart, except that limit...
Decision Models for Conducting an Economic Analysis of Alternative Fuels for the Ice Engine.
1983-03-01
p.cduc.d ICE vehicles. This analysis focusqs on electric vehicles d=.signed for commercial use. Electric hybrid vehicles which combine electric...ccntain -:he minimum gross veicle weight, engine size, and other characterist-ca of vehicles generally procured by the Federal governmen. The ir...Electric and Hybrid Vehicles, Energy Technology Review Nc. 44 published by Noyes Data Corpora’-ion. It summarizes data cn characteristics, cost, maints
Performance Benefits for a Turboshaft Engine Using Nonlinear Engine Control Technology Investigated
NASA Technical Reports Server (NTRS)
Jones, Scott M.
2004-01-01
The potential benefits of nonlinear engine control technology applied to a General Electric T700 helicopter engine were investigated. This technology is being developed by the U.S. Navy SPAWAR Systems Center for a variety of applications. When used as a means of active stability control, nonlinear engine control technology uses sensors and small amounts of injected air to allow compressors to operate with reduced stall margin, which can improve engine pressure ratio. The focus of this study was to determine the best achievable reduction in fuel consumption for the T700 turboshaft engine. A customer deck (computer code) was provided by General Electric to calculate the T700 engine performance, and the NASA Glenn Research Center used this code to perform the analysis. The results showed a 2- to 5-percent reduction in brake specific fuel consumption (BSFC) at the three Sikorsky H-60 helicopter operating points of cruise, loiter, and hover.
46 CFR 111.85-1 - Electric oil immersion heaters.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Electric oil immersion heaters. 111.85-1 Section 111.85-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Oil Immersion Heaters § 111.85-1 Electric oil immersion heaters...
46 CFR 111.85-1 - Electric oil immersion heaters.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Electric oil immersion heaters. 111.85-1 Section 111.85-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Oil Immersion Heaters § 111.85-1 Electric oil immersion heaters...
46 CFR 111.85-1 - Electric oil immersion heaters.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Electric oil immersion heaters. 111.85-1 Section 111.85-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Oil Immersion Heaters § 111.85-1 Electric oil immersion heaters...
46 CFR 111.85-1 - Electric oil immersion heaters.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Electric oil immersion heaters. 111.85-1 Section 111.85-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Oil Immersion Heaters § 111.85-1 Electric oil immersion heaters...
46 CFR 111.85-1 - Electric oil immersion heaters.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Electric oil immersion heaters. 111.85-1 Section 111.85-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Oil Immersion Heaters § 111.85-1 Electric oil immersion heaters...
Evaluation of Potential Military Applications of Stirling Engines
1988-07-01
ES- 1 C. Generator Sn-,s (Mobile Electric Power) ..................................... ES-3 1. General Purpose...ES-2 ES-2. General Purpose Generator Sets in the US DoD Inventory ..................... ES-4 ES-3. Comparison of Typical Diesel Engines Used in DoD...Standard Family Generator Sets and Stirling Engines ....................................... ES-4 ES-4. Underwater Energy Storage
46 CFR 110.30-5 - Inspection for certification.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Testing and Inspection § 110.30-5 Inspection for certification. Electric installations and electric... mechanical and electrical condition and performance. Particular note must be made of circuits added or...
46 CFR 110.30-5 - Inspection for certification.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Testing and Inspection § 110.30-5 Inspection for certification. Electric installations and electric... mechanical and electrical condition and performance. Particular note must be made of circuits added or...
46 CFR 110.30-5 - Inspection for certification.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Testing and Inspection § 110.30-5 Inspection for certification. Electric installations and electric... mechanical and electrical condition and performance. Particular note must be made of circuits added or...
46 CFR 111.106-17 - Piping: electrical bonding.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Piping: electrical bonding. 111.106-17 Section 111.106-17 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations on OSVs § 111.106-17 Piping: electrical bonding. (a...
Code of Federal Regulations, 2014 CFR
2014-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS... Generator as the Sole Emergency Power Source § 112.35-1 General. This subpart contains requirements applicable to emergency power installations having a manually controlled storage battery, diesel engine, or...
Code of Federal Regulations, 2012 CFR
2012-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS... Generator as the Sole Emergency Power Source § 112.35-1 General. This subpart contains requirements applicable to emergency power installations having a manually controlled storage battery, diesel engine, or...
Code of Federal Regulations, 2013 CFR
2013-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS... Generator as the Sole Emergency Power Source § 112.35-1 General. This subpart contains requirements applicable to emergency power installations having a manually controlled storage battery, diesel engine, or...
46 CFR 111.05-3 - Design, construction, and installation; general.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Design, construction, and installation; general. 111.05-3 Section 111.05-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Equipment Ground, Ground Detection, and Grounded Systems § 111.05-3 Design, construction, and...
46 CFR 111.05-3 - Design, construction, and installation; general.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Design, construction, and installation; general. 111.05-3 Section 111.05-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Equipment Ground, Ground Detection, and Grounded Systems § 111.05-3 Design, construction, and...
46 CFR 111.50-2 - Systems integration.
Code of Federal Regulations, 2012 CFR
2012-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-2 Systems integration. The electrical characteristics of each... the design of the entire protective system. Note to § 111.50-2: The electrical characteristics of...
46 CFR 111.50-2 - Systems integration.
Code of Federal Regulations, 2014 CFR
2014-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-2 Systems integration. The electrical characteristics of each... the design of the entire protective system. Note to § 111.50-2: The electrical characteristics of...
46 CFR 111.50-2 - Systems integration.
Code of Federal Regulations, 2013 CFR
2013-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-2 Systems integration. The electrical characteristics of each... the design of the entire protective system. Note to § 111.50-2: The electrical characteristics of...
46 CFR 111.50-2 - Systems integration.
Code of Federal Regulations, 2011 CFR
2011-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-2 Systems integration. The electrical characteristics of each... the design of the entire protective system. Note to § 111.50-2: The electrical characteristics of...
46 CFR 111.97-1 - Applicability.
Code of Federal Regulations, 2014 CFR
2014-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-1 Applicability. This subpart applies to electric power-operated watertight door systems required under Subpart H of Part 170 of this chapter. [CGD...
46 CFR 111.97-1 - Applicability.
Code of Federal Regulations, 2013 CFR
2013-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-1 Applicability. This subpart applies to electric power-operated watertight door systems required under Subpart H of Part 170 of this chapter. [CGD...
46 CFR 111.97-1 - Applicability.
Code of Federal Regulations, 2011 CFR
2011-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-1 Applicability. This subpart applies to electric power-operated watertight door systems required under Subpart H of Part 170 of this chapter. [CGD...
46 CFR 111.97-1 - Applicability.
Code of Federal Regulations, 2012 CFR
2012-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-1 Applicability. This subpart applies to electric power-operated watertight door systems required under Subpart H of Part 170 of this chapter. [CGD...
46 CFR 111.97-1 - Applicability.
Code of Federal Regulations, 2010 CFR
2010-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-1 Applicability. This subpart applies to electric power-operated watertight door systems required under Subpart H of Part 170 of this chapter. [CGD...
Evaluation of Microencapsulated Penetrant Inspection.
1980-12-01
AD-A9b 826 GENERAL ELECTRIC CO CINCINNATI OH AIRCRAFT ENGINE GROUP F/6 IA/2ADG EVALUATION OF MICROENCAPSULATED PENETRANT INSPECTION.(U) DEC 80 J M...4156 ADA096826 EVALUATION OF MICROENCAPSULATED PENETRANT INSPECTION i :I J.M. Portaz Aircraft Engine Group General Electric Company Cincinnati, Ohio... Microencapsulated Penetrant 5 7riJF-Iehica17 = Inspection p un May@84 -1 ---- --- ---- 19AMFGK657j7 7. AiJTHOR(s) nVCWRACT OR GRANT m " JO J.M./Portaz
Code of Federal Regulations, 2013 CFR
2013-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having an Automatic Starting Diesel Engine or Gas Turbine Driven Emergency Power Source as the Sole Emergency Power Source § 112.25-1 General. This subpart contains requirements applicable to...
Code of Federal Regulations, 2014 CFR
2014-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having an Automatic Starting Diesel Engine or Gas Turbine Driven Emergency Power Source as the Sole Emergency Power Source § 112.25-1 General. This subpart contains requirements applicable to...
Code of Federal Regulations, 2010 CFR
2010-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having an Automatic Starting Diesel Engine or Gas Turbine Driven Emergency Power Source as the Sole Emergency Power Source § 112.25-1 General. This subpart contains requirements applicable to...
Code of Federal Regulations, 2011 CFR
2011-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having an Automatic Starting Diesel Engine or Gas Turbine Driven Emergency Power Source as the Sole Emergency Power Source § 112.25-1 General. This subpart contains requirements applicable to...
Code of Federal Regulations, 2012 CFR
2012-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having an Automatic Starting Diesel Engine or Gas Turbine Driven Emergency Power Source as the Sole Emergency Power Source § 112.25-1 General. This subpart contains requirements applicable to...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false General. 169.605 Section 169.605 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical... engine cooling water temperature, exhaust cooling water temperature and engine lubricating oil pressure...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Excitation. 111.12-3 Section 111.12-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-3 Excitation. In general, excitation must meet...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Excitation. 111.12-3 Section 111.12-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-3 Excitation. In general, excitation must meet...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Excitation. 111.12-3 Section 111.12-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-3 Excitation. In general, excitation must meet...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Excitation. 111.12-3 Section 111.12-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-3 Excitation. In general, excitation must meet...
46 CFR 111.87-1 - Applicability.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Applicability. 111.87-1 Section 111.87-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Air Heating Equipment § 111.87-1 Applicability. This subpart applies to electrically...
46 CFR 111.87-1 - Applicability.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Applicability. 111.87-1 Section 111.87-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Air Heating Equipment § 111.87-1 Applicability. This subpart applies to electrically...
46 CFR 111.87-1 - Applicability.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Applicability. 111.87-1 Section 111.87-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Air Heating Equipment § 111.87-1 Applicability. This subpart applies to electrically...
46 CFR 111.87-1 - Applicability.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Applicability. 111.87-1 Section 111.87-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Air Heating Equipment § 111.87-1 Applicability. This subpart applies to electrically...
46 CFR 111.87-1 - Applicability.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Applicability. 111.87-1 Section 111.87-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Air Heating Equipment § 111.87-1 Applicability. This subpart applies to electrically...
NASA Technical Reports Server (NTRS)
Blivas, Darnold; Taylor, Burt L., III
1950-01-01
Performance data obtained with recording oscillographs are presented to show the transient response of the General Electric Integrated Electronic Control operating on the J47 RXl-3 turbo-Jet engine over a range of altitudes from 10,000 to 45,000 feet and at ram pressure ratios of 1.03 and 1.4. These data represent the performance of the final control configuration developed after an investigation of the engine transient behavior in the NACA altitude wind tunnel. Oscillograph traces of controlled accelerations (throttle bursts),oontrolled decelerations (throttle chops), and controlled altitude starts are presented.
142. ARAIII General plan of GCRE area, including electrical distribution ...
142. ARA-III General plan of GCRE area, including electrical distribution plan for power and lighting. Includes detail of floodlight and security lighting poles and fixtures. Aerojet-general 880-area/GCRE-406-1. Date: February 1958. Ineel index code no. 063-0406-00-013-102539. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
AFP no. 28 (General Electric Lynn Manufacturing dept). is located in the City of Everett, Mass. The facility is composed of 10 buildings having 344,342 square feet of floor space on a 43-acre tract. The plant is engaged in the manufacture of large jet engine components and sub-assemblies. AFT 29 (General Electric River Works Facility) is located in the City of Lynn, Mass. AFT No. 29 is part of the General Electric Aircraft Engine Business Group and the facilities are used for testing and assembly of jet engines. The following conclusions have been developed based on the results of themore » project team's field inspection, review of plant records and files, and interviews with plant personnel. Each of the sites listed below was ranked using the HARM system and was determined to have a sufficient potential for environmental contamination to warrant some degree of follow-on investigation. AFB no. 28: Waste sump and chip storage area; and AFT no. 29: Underground fuel line leaks and underground fuel storage tank leak.« less
Lightweight diesel aircraft engines for general aviation
NASA Technical Reports Server (NTRS)
Berenyi, S. G.
1983-01-01
Two different engines were studied. The advantages of a diesel to general aviation were reduced to fuel consumption, reduced operating costs, and reduced fire and explosion hazard. There were no ignition mixture control or inlet icing problems. There are fewer controls and no electrical interference problems.
1969-01-21
The Fan Noise Test Facility built at the Lewis Research Center to obtain far-field noise data for the National Aeronautics and Space Administration (NASA) and General Electric Quiet Engine Program. The engine incorporated existing noise reduction methods into an engine of similar power to those that propelled the Boeing 707 or McDonnell-Douglas DC-8 airliner. The new the low-bypass ratio turbofan engines of the 1960s were inherently quieter than their turbojet counterparts, researchers had a better grasp of the noise generation problem, and new acoustic technologies had emerged. Lewis contracted General Electric in 1969 to build and aerodynamically test three experimental engines with 72-inch diameter fans. The engines were then brought to Lewis and tested with an acoustically treated nacelle. This Fan Noise Test Facility was built off of the 10- by 10-Foot Supersonic Wind Tunnel’s Main Compressor and Drive Building. Lewis researchers were able to isolate the fan’s noise during these initial tests by removing the core of the engine. The Lewis test rig drove engines to takeoff tip speeds of 1160 feet per second. The facility was later used to test a series of full-scale model fans and fan noise suppressors to be used with the quiet engine. NASA researchers predicted low-speed single-stage fans without inlet guide vanes and with large spacing between rotors and stators would be quieter. General Electric modified a TF39 turbofan engine by removing the the outer protion of the fan and spacing the blade rows of the inner portion. The tests revealed that the untreated version of the engine generated less noise than was anticipated, and the acoustically treated nacelle substantially reduced engine noise.
46 CFR 110.30-3 - Initial inspection.
Code of Federal Regulations, 2010 CFR
2010-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS... inspections during the construction of the vessel, includes a complete inspection of the electric installation and electric equipment or apparatus. The inspection is to determine that the arrangement, materials...
46 CFR 110.30-3 - Initial inspection.
Code of Federal Regulations, 2014 CFR
2014-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS... inspections during the construction of the vessel, includes a complete inspection of the electric installation and electric equipment or apparatus. The inspection is to determine that the arrangement, materials...
46 CFR 110.30-3 - Initial inspection.
Code of Federal Regulations, 2011 CFR
2011-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS... inspections during the construction of the vessel, includes a complete inspection of the electric installation and electric equipment or apparatus. The inspection is to determine that the arrangement, materials...
33 CFR 183.501 - Applicability.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) BOATING SAFETY BOATS AND ASSOCIATED EQUIPMENT Fuel Systems General § 183.501 Applicability. (a) This subpart applies to all boats that have gasoline engines, except outboard engines, for electrical...
A review of Soviet plasma engine development
NASA Technical Reports Server (NTRS)
Barnett, John W.
1990-01-01
The Soviet Union has maintained a substantial and successful electric propulsion research and development effort since the 1950s; however, American researchers are generally unfamiliar with the Soviet accomplishments. Sources of information about Soviet electric propulsion research are noted. The development of plasma engines, a subset of the electric propulsion effort, is reviewed using numerous Soviet sources. The operational principles and status of several engines of the closed electron drift and high-current types are discussed. With recognition of the limited knowledge of the current Soviet program, the Soviet and American programs are compared, revealing some differences in program formulation and emphasis.
46 CFR 113.30-20 - General requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false General requirements. 113.30-20 Section 113.30-20 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND... for the operation of the vessel, such as the captain's and chief engineer's offices and staterooms...
46 CFR 113.30-20 - General requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false General requirements. 113.30-20 Section 113.30-20 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND... for the operation of the vessel, such as the captain's and chief engineer's offices and staterooms...
46 CFR 113.30-20 - General requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false General requirements. 113.30-20 Section 113.30-20 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND... for the operation of the vessel, such as the captain's and chief engineer's offices and staterooms...
46 CFR 113.30-20 - General requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false General requirements. 113.30-20 Section 113.30-20 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND... for the operation of the vessel, such as the captain's and chief engineer's offices and staterooms...
46 CFR 113.30-20 - General requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false General requirements. 113.30-20 Section 113.30-20 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND... for the operation of the vessel, such as the captain's and chief engineer's offices and staterooms...
46 CFR 111.30-19 - Buses and wiring.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Buses and wiring. 111.30-19 Section 111.30-19 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-19 Buses and wiring. (a) General. Each bus must meet the requirements of...
46 CFR 111.30-19 - Buses and wiring.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Buses and wiring. 111.30-19 Section 111.30-19 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-19 Buses and wiring. (a) General. Each bus must meet the requirements of...
46 CFR 111.30-19 - Buses and wiring.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Buses and wiring. 111.30-19 Section 111.30-19 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-19 Buses and wiring. (a) General. Each bus must meet the requirements of...
46 CFR 111.30-19 - Buses and wiring.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Buses and wiring. 111.30-19 Section 111.30-19 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-19 Buses and wiring. (a) General. Each bus must meet the requirements of...
46 CFR 111.01-13 - Limitations on porcelain use.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Limitations on porcelain use. 111.01-13 Section 111.01-13 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-13 Limitations on porcelain use. Porcelain must not be used...
46 CFR 111.01-7 - Accessibility and spacing.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Accessibility and spacing. 111.01-7 Section 111.01-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-7 Accessibility and spacing. (a) The design and arrangement of...
46 CFR 111.01-7 - Accessibility and spacing.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Accessibility and spacing. 111.01-7 Section 111.01-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-7 Accessibility and spacing. (a) The design and arrangement of...
46 CFR 111.60-9 - Segregation of vital circuits.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Segregation of vital circuits. 111.60-9 Section 111.60-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Wiring Materials and Methods § 111.60-9 Segregation of vital circuits. (a) General. A...
46 CFR 111.60-9 - Segregation of vital circuits.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Segregation of vital circuits. 111.60-9 Section 111.60-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Wiring Materials and Methods § 111.60-9 Segregation of vital circuits. (a) General. A...
46 CFR 111.95-7 - Wiring of boat winch components.
Code of Federal Regulations, 2012 CFR
2012-10-01
...-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-7 Wiring of boat winch... electric installation from all sources of potential. The switch must be in series with and on the supply...
46 CFR 111.95-7 - Wiring of boat winch components.
Code of Federal Regulations, 2013 CFR
2013-10-01
...-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-7 Wiring of boat winch... electric installation from all sources of potential. The switch must be in series with and on the supply...
46 CFR 111.95-7 - Wiring of boat winch components.
Code of Federal Regulations, 2011 CFR
2011-10-01
...-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-7 Wiring of boat winch... electric installation from all sources of potential. The switch must be in series with and on the supply...
46 CFR 111.95-7 - Wiring of boat winch components.
Code of Federal Regulations, 2014 CFR
2014-10-01
...-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-7 Wiring of boat winch... electric installation from all sources of potential. The switch must be in series with and on the supply...
Code of Federal Regulations, 2014 CFR
2014-07-01
...) General cycle. Propulsion engines that are used with (or intended to be used with) fixed-pitch propellers, propeller-law auxiliary engines, and any other engines for which the other duty cycles of this section do... value. (c) Variable-pitch and electrically coupled propellers. (1) Constant-speed propulsion engines...
Code of Federal Regulations, 2013 CFR
2013-07-01
...) General cycle. Propulsion engines that are used with (or intended to be used with) fixed-pitch propellers, propeller-law auxiliary engines, and any other engines for which the other duty cycles of this section do... value. (c) Variable-pitch and electrically coupled propellers. (1) Constant-speed propulsion engines...
Code of Federal Regulations, 2012 CFR
2012-07-01
...) General cycle. Propulsion engines that are used with (or intended to be used with) fixed-pitch propellers, propeller-law auxiliary engines, and any other engines for which the other duty cycles of this section do... value. (c) Variable-pitch and electrically coupled propellers. (1) Constant-speed propulsion engines...
Code of Federal Regulations, 2011 CFR
2011-07-01
...) General cycle. Propulsion engines that are used with (or intended to be used with) fixed-pitch propellers, propeller-law auxiliary engines, and any other engines for which the other duty cycles of this section do... value. (c) Variable-pitch and electrically coupled propellers. (1) Constant-speed propulsion engines...
76 FR 64291 - Airworthiness Directives; General Electric Company (GE) Turbofan Engines
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-18
... Company (GE) Turbofan Engines AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of... turbofan engines, including engines marked on the engine data plate as CF6-80C2B7F1. This proposed AD was... on engines in service. This proposed AD would require a one- time inspection of the No. 3 bearing...
77 FR 4650 - Airworthiness Directives; General Electric Company Turbofan Engines
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-31
... blade borescope inspection (BSI) or a failed engine core vibration survey, establishes a new lower life... LPT rotor stage 3 disk removal after a failed HPT blade BSI or a failed engine core vibration survey... engine test cell as part of an engine manual performance run fulfill the vibration survey requirements of...
Code of Federal Regulations, 2010 CFR
2010-01-01
... ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES General § 1724.1... standard form of loan documents between the Rural Utilities Service (RUS) and its electric borrowers. (b... to design, construction standards, and the use of RUS accepted material on their electric systems. (c...
46 CFR 111.05-21 - Ground detection.
Code of Federal Regulations, 2014 CFR
2014-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL... be ground detection for each: (a) Electric propulsion system; (b) Ship's service power system; (c) Lighting system; and (d) Power or lighting distribution system that is isolated from the ship's service...
46 CFR 111.05-21 - Ground detection.
Code of Federal Regulations, 2012 CFR
2012-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL... be ground detection for each: (a) Electric propulsion system; (b) Ship's service power system; (c) Lighting system; and (d) Power or lighting distribution system that is isolated from the ship's service...
46 CFR 111.05-21 - Ground detection.
Code of Federal Regulations, 2013 CFR
2013-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL... be ground detection for each: (a) Electric propulsion system; (b) Ship's service power system; (c) Lighting system; and (d) Power or lighting distribution system that is isolated from the ship's service...
46 CFR 113.35-3 - General requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND ALARM...-propelled vessel, except as provided in paragraph (d) of this section, must have an electric or mechanical... must be electrically separate and independent, except that a single mechanical operator control device...
46 CFR 113.35-3 - General requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND ALARM...-propelled vessel, except as provided in paragraph (d) of this section, must have an electric or mechanical... must be electrically separate and independent, except that a single mechanical operator control device...
46 CFR 113.35-3 - General requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND ALARM...-propelled vessel, except as provided in paragraph (d) of this section, must have an electric or mechanical... must be electrically separate and independent, except that a single mechanical operator control device...
46 CFR 113.35-3 - General requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND ALARM...-propelled vessel, except as provided in paragraph (d) of this section, must have an electric or mechanical... must be electrically separate and independent, except that a single mechanical operator control device...
46 CFR 113.35-3 - General requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND ALARM...-propelled vessel, except as provided in paragraph (d) of this section, must have an electric or mechanical... must be electrically separate and independent, except that a single mechanical operator control device...
46 CFR 111.97-9 - Overcurrent protection.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-9 Overcurrent protection. Overcurrent devices must be arranged to isolate a fault with as little disruption of the system as possible...
7 CFR 1724.6 - Insurance requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES General § 1724.6 Insurance requirements. (a) Borrowers shall ensure that all architects and engineers working under contract... also ensure that all architects and engineers working under contract with the borrower have insurance...
7 CFR 1724.6 - Insurance requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES General § 1724.6 Insurance requirements. (a) Borrowers shall ensure that all architects and engineers working under contract... also ensure that all architects and engineers working under contract with the borrower have insurance...
7 CFR 1724.4 - Qualifications.
Code of Federal Regulations, 2013 CFR
2013-01-01
... ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES General § 1724.4 Qualifications. The borrower shall ensure that: (a) All selected architects and engineers meet the applicable... architects and engineers are familiar with RUS standards and requirements; and (c) All selected architects...
7 CFR 1724.6 - Insurance requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES General § 1724.6 Insurance requirements. (a) Borrowers shall ensure that all architects and engineers working under contract... also ensure that all architects and engineers working under contract with the borrower have insurance...
7 CFR 1724.4 - Qualifications.
Code of Federal Regulations, 2011 CFR
2011-01-01
... ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES General § 1724.4 Qualifications. The borrower shall ensure that: (a) All selected architects and engineers meet the applicable... architects and engineers are familiar with RUS standards and requirements; and (c) All selected architects...
7 CFR 1724.6 - Insurance requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES General § 1724.6 Insurance requirements. (a) Borrowers shall ensure that all architects and engineers working under contract... also ensure that all architects and engineers working under contract with the borrower have insurance...
7 CFR 1724.4 - Qualifications.
Code of Federal Regulations, 2014 CFR
2014-01-01
... ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES General § 1724.4 Qualifications. The borrower shall ensure that: (a) All selected architects and engineers meet the applicable... architects and engineers are familiar with RUS standards and requirements; and (c) All selected architects...
7 CFR 1724.4 - Qualifications.
Code of Federal Regulations, 2012 CFR
2012-01-01
... ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES General § 1724.4 Qualifications. The borrower shall ensure that: (a) All selected architects and engineers meet the applicable... architects and engineers are familiar with RUS standards and requirements; and (c) All selected architects...
7 CFR 1724.6 - Insurance requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES General § 1724.6 Insurance requirements. (a) Borrowers shall ensure that all architects and engineers working under contract... also ensure that all architects and engineers working under contract with the borrower have insurance...
7 CFR 1724.4 - Qualifications.
Code of Federal Regulations, 2010 CFR
2010-01-01
... ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES General § 1724.4 Qualifications. The borrower shall ensure that: (a) All selected architects and engineers meet the applicable... architects and engineers are familiar with RUS standards and requirements; and (c) All selected architects...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-13
... safety, chemical process safety, fire safety, emergency management, environmental protection... the transportation of SNM of low strategic significance, human factors engineering, and electrical...
46 CFR 111.01-5 - Protection from bilge water.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Protection from bilge water. 111.01-5 Section 111.01-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-5 Protection from bilge water. Each of the following in or around...
46 CFR 111.01-5 - Protection from bilge water.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Protection from bilge water. 111.01-5 Section 111.01-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-5 Protection from bilge water. Each of the following in or around...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Appliances. 111.77-3 Section 111.77-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Appliances and Appliance Circuits § 111.77-3 Appliances. All electrical appliances, including, but...
46 CFR 111.97-9 - Overcurrent protection.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Overcurrent protection. 111.97-9 Section 111.97-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-9 Overcurrent protection...
46 CFR 111.97-9 - Overcurrent protection.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Overcurrent protection. 111.97-9 Section 111.97-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-9 Overcurrent protection...
46 CFR 111.97-9 - Overcurrent protection.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Overcurrent protection. 111.97-9 Section 111.97-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-9 Overcurrent protection...
46 CFR 111.97-9 - Overcurrent protection.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Overcurrent protection. 111.97-9 Section 111.97-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-9 Overcurrent protection...
46 CFR 111.60-17 - Connections and terminations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Connections and terminations. 111.60-17 Section 111.60-17 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC... general, connections and terminations to all conductors must retain the original electrical, mechanical...
46 CFR 111.60-17 - Connections and terminations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Connections and terminations. 111.60-17 Section 111.60-17 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC... general, connections and terminations to all conductors must retain the original electrical, mechanical...
46 CFR 111.60-17 - Connections and terminations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Connections and terminations. 111.60-17 Section 111.60-17 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC... general, connections and terminations to all conductors must retain the original electrical, mechanical...
46 CFR 111.50-2 - Systems integration.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Systems integration. 111.50-2 Section 111.50-2 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-2 Systems integration. The electrical characteristics of each...
46 CFR 111.05-13 - Grounding connection.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Equipment Ground, Ground Detection, and Grounded Systems § 111.05-13 Grounding... power sources operating in parallel in the system. ...
ERIC Educational Resources Information Center
Texas A and M Univ., College Station. Vocational Instructional Services.
This course outline, the first volume of a two-volume set, consists of lesson plans for pre-employment laboratory training in general agricultural mechanics. Covered in the 12 lessons included in this volume are selecting tractors and engines, diagnosing engine conditions, servicing electrical systems, servicing cooling systems, servicing fuel and…
46 CFR 111.33-9 - Ventilation exhaust.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Ventilation exhaust. 111.33-9 Section 111.33-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL... under Subpart 111.105 of this part; and (b) Not impinge upon any other electric device. ...
46 CFR 111.30-15 - Nameplates.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Nameplates. 111.30-15 Section 111.30-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL... function. (b) Each nameplate for a circuit breaker must show the electrical load served and the setting of...
46 CFR 111.30-24 - Generation systems greater than 3000 kw.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Section 111.30-24 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-24 Generation systems greater than 3000 kw... Outer Continental Shelf facility, when the total installed electric power of the ship's service...
46 CFR 111.30-24 - Generation systems greater than 3000 kw.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 111.30-24 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-24 Generation systems greater than 3000 kw... Outer Continental Shelf facility, when the total installed electric power of the ship's service...
46 CFR 111.30-15 - Nameplates.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Nameplates. 111.30-15 Section 111.30-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL... function. (b) Each nameplate for a circuit breaker must show the electrical load served and the setting of...
46 CFR 111.10-4 - Power requirements, generating sources.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 111.10-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Supply § 111.10-4 Power requirements, generating sources. (a) The aggregate capacity of the electric ship's service generating sources required in § 111.10-3 must...
46 CFR 111.30-15 - Nameplates.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Nameplates. 111.30-15 Section 111.30-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL... function. (b) Each nameplate for a circuit breaker must show the electrical load served and the setting of...
46 CFR 111.33-9 - Ventilation exhaust.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Ventilation exhaust. 111.33-9 Section 111.33-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL... under Subpart 111.105 of this part; and (b) Not impinge upon any other electric device. ...
46 CFR 111.10-4 - Power requirements, generating sources.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 111.10-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Supply § 111.10-4 Power requirements, generating sources. (a) The aggregate capacity of the electric ship's service generating sources required in § 111.10-3 must...
46 CFR 111.30-15 - Nameplates.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Nameplates. 111.30-15 Section 111.30-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL... function. (b) Each nameplate for a circuit breaker must show the electrical load served and the setting of...
46 CFR 111.30-15 - Nameplates.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Nameplates. 111.30-15 Section 111.30-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL... function. (b) Each nameplate for a circuit breaker must show the electrical load served and the setting of...
46 CFR 111.30-24 - Generation systems greater than 3000 kw.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Section 111.30-24 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-24 Generation systems greater than 3000 kw... Outer Continental Shelf facility, when the total installed electric power of the ship's service...
46 CFR 111.30-24 - Generation systems greater than 3000 kw.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Section 111.30-24 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-24 Generation systems greater than 3000 kw... Outer Continental Shelf facility, when the total installed electric power of the ship's service...
46 CFR 111.30-24 - Generation systems greater than 3000 kw.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Section 111.30-24 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-24 Generation systems greater than 3000 kw... Outer Continental Shelf facility, when the total installed electric power of the ship's service...
46 CFR 111.33-9 - Ventilation exhaust.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Ventilation exhaust. 111.33-9 Section 111.33-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL... under Subpart 111.105 of this part; and (b) Not impinge upon any other electric device. ...
46 CFR 111.33-9 - Ventilation exhaust.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Ventilation exhaust. 111.33-9 Section 111.33-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL... under Subpart 111.105 of this part; and (b) Not impinge upon any other electric device. ...
46 CFR 111.10-4 - Power requirements, generating sources.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 111.10-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Supply § 111.10-4 Power requirements, generating sources. (a) The aggregate capacity of the electric ship's service generating sources required in § 111.10-3 must...
46 CFR 111.91-1 - Power, control, and interlock circuits.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 111.91-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Elevators and Dumbwaiters § 111.91-1 Power, control, and interlock circuits. Each electric power, control, and interlock circuit of an elevator or dumbwaiter must meet ASME...
46 CFR 111.91-1 - Power, control, and interlock circuits.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 111.91-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Elevators and Dumbwaiters § 111.91-1 Power, control, and interlock circuits. Each electric power, control, and interlock circuit of an elevator or dumbwaiter must meet ASME...
46 CFR 111.91-1 - Power, control, and interlock circuits.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 111.91-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Elevators and Dumbwaiters § 111.91-1 Power, control, and interlock circuits. Each electric power, control, and interlock circuit of an elevator or dumbwaiter must meet ASME...
46 CFR 111.91-1 - Power, control, and interlock circuits.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 111.91-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Elevators and Dumbwaiters § 111.91-1 Power, control, and interlock circuits. Each electric power, control, and interlock circuit of an elevator or dumbwaiter must meet ASME...
46 CFR 111.91-1 - Power, control, and interlock circuits.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 111.91-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Elevators and Dumbwaiters § 111.91-1 Power, control, and interlock circuits. Each electric power, control, and interlock circuit of an elevator or dumbwaiter must meet ASME...
46 CFR 111.105-41 - Battery rooms.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Battery rooms. 111.105-41 Section 111.105-41 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-41 Battery rooms. Each electrical installation in a battery room...
46 CFR 110.30-5 - Inspection for certification.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Inspection for certification. 110.30-5 Section 110.30-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Testing and Inspection § 110.30-5 Inspection for certification. Electric installations and electric...
46 CFR 110.30-5 - Inspection for certification.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Inspection for certification. 110.30-5 Section 110.30-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Testing and Inspection § 110.30-5 Inspection for certification. Electric installations and electric...
46 CFR 111.105-41 - Battery rooms.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Battery rooms. 111.105-41 Section 111.105-41 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-41 Battery rooms. Each electrical installation in a battery room...
46 CFR 111.105-41 - Battery rooms.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Battery rooms. 111.105-41 Section 111.105-41 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-41 Battery rooms. Each electrical installation in a battery room...
46 CFR 111.105-41 - Battery rooms.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Battery rooms. 111.105-41 Section 111.105-41 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-41 Battery rooms. Each electrical installation in a battery room...
46 CFR 111.105-41 - Battery rooms.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Battery rooms. 111.105-41 Section 111.105-41 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-41 Battery rooms. Each electrical installation in a battery room...
46 CFR 111.105-5 - System integrity.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false System integrity. 111.105-5 Section 111.105-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL... individual electrical installation in a hazardous location must comply specifically with Articles 500-505 of...
General Electric I-40 Engine at the Lewis Flight Propulsion Laboratory
1946-08-21
A mechanic works on a General Electric I-40 turbojet at the National Advisory Committee for Aeronautics (NACA) Lewis Flight Propulsion Laboratory. The military selected General Electric’s West Lynn facility in 1941 to secretly replicate the centrifugal turbojet engine designed by British engineer Frank Whittle. General Electric’s first attempt, the I-A, was fraught with problems. The design was improved somewhat with the subsequent I-16 engine. It was not until the engine's next reincarnation as the I-40 in 1943 that General Electric’s efforts paid off. The 4000-pound thrust I-40 was incorporated into the Lockheed Shooting Star airframe and successfully flown in June 1944. The Shooting Star became the US’s first successful jet aircraft and the first US aircraft to reach 500 miles per hour. The NACA’s Lewis Flight Propulsion Laboratory studied all of General Electric’s centrifugal turbojets both during World War II and afterwards. The entire Shooting Star aircraft was investigated in the Altitude Wind Tunnel during 1945. The researchers studied the engine compressor performance, thrust augmentation using a water injection, and compared different fuel blends in a single combustor. The mechanic in this photograph is inserting a combustion liner into one of the 14 combustor cans. The compressor, which is not yet installed in this photograph, pushed high pressure air into these combustors. There the air mixed with the fuel and was heated. The hot air was then forced through a rotating turbine that powered the engine before being expelled out the nozzle to produce thrust.
77 FR 42677 - Special Conditions: General Electric CT7-2E1 Turboshaft Engine
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-20
... Mihail, ANE-111, Engine and Propeller Directorate, Aircraft Certification Service, 12 New England..., ANE-7 Engine and Propeller Directorate, Aircraft Certification Service, 12 New England Executive Park... additional requirements for the rating's definition, overspeed, controls system, and endurance test because...
Quiet Clean Short Haul Experimental Engine
1973-02-21
Program manager Carl Ciepluch poses with a model of the Quiet Clean Short Haul Experimental Engine (QCSEE) conceived by the National Aeronautics and Space Administration (NASA) Lewis Research Center. The QCSEE engine was designed to power future short-distance transport aircraft without generating significant levels of noise or pollution and without hindering performance. The engines were designed to be utilized on aircraft operating from small airports with short runways. Lewis researchers investigated two powered-lift designs and an array of new technologies to deal with the shorter runways. Lewis contracted General Electric to design the two QCSEE engines—one with over-the-wing power-lift and one with an under-the-wing design. A scale model of the over-the-wing engine was tested in the Full Scale Tunnel at the Langley Research Center in 1975 and 1976. Lewis researchers investigated both versions in a specially-designed test stand, the Engine Noise Test Facility, on the hangar apron. The QCSEE engines met the goals set out by the NASA researchers. The aircraft industry, however, never built the short-distance transport aircraft for which the engines were intended. Different technological elements of the engine, however, were applied to some future General Electric engines.
Supercharger Research at the Aircraft Engine Research Laboratory
1944-01-21
A researcher in the Supercharger Research Division at the National Advisory Committee for Aeronautics (NACA) Aircraft Engine Research Laboratory measures the blade thickness on a supercharger. Superchargers were developed at General Electric used to supply additional air to reciprocating engines. The extra air resulted in increased the engine’s performance, particularly at higher altitudes. The Aircraft Engine Research Laboratory had an entire division dedicated to superchargers during World War II. General Electric developed the supercharger in response to a 1917 request from the NACA to develop a device to enhance high-altitude flying. The supercharger pushed larger volumes of air into the engine manifold. The extra oxygen allowed the engine to operate at its optimal sea-level rating even when at high altitudes. Thus, the aircraft could maintain its climb rate, maneuverability and speed as it rose higher into the sky. NACA work on the supercharger ceased after World War II due to the arrival of the turbojet engine. The Supercharger Research Division was disbanded in October 1945 and reconstituted as the Compressor and Turbine Division.
77 FR 74125 - Airworthiness Directives; General Electric Company Turbofan Engines
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-13
... Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of proposed... Company (GE) CF34-8C and CF34-8E turbofan engines with certain part numbers (P/N) of operability bleed... received reports of three failure events of OBV ring lock fuel fittings on GE CF34-8C turbofan engines. Two...
Project CAD as of July 1978: CAD support project, situation in July 1978
NASA Technical Reports Server (NTRS)
Boesch, L.; Lang-Lendorff, G.; Rothenberg, R.; Stelzer, V.
1979-01-01
The structure of Computer Aided Design (CAD) and the requirements for program developments in past and future are described. The actual standard and the future aims of CAD programs are presented. The developed programs in: (1) civil engineering; (2) mechanical engineering; (3) chemical engineering/shipbuilding; (4) electrical engineering; and (5) general programs are discussed.
75 FR 77570 - Airworthiness Directives; General Electric Company CF6 Series Turbofan Engines
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-13
... electronically. Mail: Docket Management Facility, U.S. Department of Transportation, 1200 New Jersey Avenue, SE...-2251. FOR FURTHER INFORMATION CONTACT: Tomasz Rakowski, Aerospace Engineer, Engine Certification Office... signed the comment on behalf of an association, business, labor union, etc.). You may review the DOT's...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false General. 110.30-1 Section 110.30-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Testing and Inspection § 110.30-1 General. (a) This section supplements the general requirements for testing and inspecting...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false General. 110.30-1 Section 110.30-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Testing and Inspection § 110.30-1 General. (a) This section supplements the general requirements for testing and inspecting...
Integral Engine Inlet Particle Separator. Volume 1. Technology Program
1975-07-01
inlet particle separators for future Army aircraft gas turbine engines . Appropriate technical personnel of this Directorate have reviewed this report...USAAMRDL-TR-75-31A I - / INTEGRAL ENGINE INLET PARTICLE SEPARATOR Volume I-- Technology Program General Electric Company Aircraft Engine Group...N1 i 9ap mm tm~qu INTRODUCTION The adverse environments in which Army equipment operates impose severe )enalties upon gas turbine engine performance
General Electric 32-Spoke Nozzle on the Convair F-106B Delta Dart
1971-03-21
National Aeronautics and Space Administration (NASA) Convair F-106B Delta Dart with a 32-spoke nozzle installed on its General Electric J85 test engine. Lewis acquired a Delta Dart fighter in 1966 to study the components for propulsion systems that could be applied to supersonic transport aircraft at transonic speeds. The F-106B was modified with two General Electric J85-13 engines under its wings to study these components. The original test plan was expanded to include the study of boattail drag, noise reduction, and inlets. From February to July 1971 the modified F-106B was used to study different ejector nozzles. Researchers conducted both acoustic and aerodynamic tests on the ground and in flight. Several models were created to test different suppression methods. NASA Lewis’ conical nozzle was used as the baseline configuration. Flightline and sideline microphones were set up on the ground. The F-106B would idle its own engine and buzz the recording station from an altitude of 300 feet at Mach 0.4 with the test engines firing. Researchers found that the suppression of the perceived noise level was usually lower during flight than the researchers had statistically predicted. The 64 and 32-spoke nozzles performed well in actual flight, but the others nozzles tended to negatively affect the engine’s performance. Different speeds or angles- -of-attack sometimes changed the noise levels. In the end, no general conclusions could be applied to all the nozzles.
Ally, Moonis R.; Sharma, Vishaldeep; Abdelaziz, Omar
2017-02-21
The choice of driving a heat pump with an electrically$-$or a thermally-driven engine is a vexing question complicated by the carbon footprint and environmental impact of using electricity versus natural gas (or waste heat) as the main driver for the respective engines. The amount of useful work generated by these two distinct engines is the focal point of this paper, which addresses a key question: which engine presents a better choice for a given heat pumping application within the constraints of energy and environmental stewardship? Extensive use of energy, exergy, and availability analysis is necessary to quantify the useful workmore » and to examine the issue holistically for both types of engines. The methodology explains why the output of work from these two distinct engines to satisfy a given load is vastly different, a direct consequence of their inherent Irreversibility. Thermodynamic consistency is guaranteed by satisfaction of the First and Second Laws applied to closed systems and their subsystems. The general conclusion is that thermally-driven engines are not industrious converters of heat to mechanical work.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ally, Moonis R.; Sharma, Vishaldeep; Abdelaziz, Omar
The choice of driving a heat pump with an electrically$-$or a thermally-driven engine is a vexing question complicated by the carbon footprint and environmental impact of using electricity versus natural gas (or waste heat) as the main driver for the respective engines. The amount of useful work generated by these two distinct engines is the focal point of this paper, which addresses a key question: which engine presents a better choice for a given heat pumping application within the constraints of energy and environmental stewardship? Extensive use of energy, exergy, and availability analysis is necessary to quantify the useful workmore » and to examine the issue holistically for both types of engines. The methodology explains why the output of work from these two distinct engines to satisfy a given load is vastly different, a direct consequence of their inherent Irreversibility. Thermodynamic consistency is guaranteed by satisfaction of the First and Second Laws applied to closed systems and their subsystems. The general conclusion is that thermally-driven engines are not industrious converters of heat to mechanical work.« less
46 CFR 111.20-10 - Autotransformers.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Autotransformers. 111.20-10 Section 111.20-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Transformer Construction, Installation, and Protection § 111.20-10 Autotransformers. An...
46 CFR 111.20-10 - Autotransformers.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Autotransformers. 111.20-10 Section 111.20-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Transformer Construction, Installation, and Protection § 111.20-10 Autotransformers. An...
46 CFR 111.20-10 - Autotransformers.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Autotransformers. 111.20-10 Section 111.20-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Transformer Construction, Installation, and Protection § 111.20-10 Autotransformers. An...
46 CFR 111.20-10 - Autotransformers.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Autotransformers. 111.20-10 Section 111.20-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Transformer Construction, Installation, and Protection § 111.20-10 Autotransformers. An...
46 CFR 111.20-10 - Autotransformers.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Autotransformers. 111.20-10 Section 111.20-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Transformer Construction, Installation, and Protection § 111.20-10 Autotransformers. An...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-20
... follow the instructions for sending your comments electronically. Mail: Docket Management Facility, U.S... J. Richards, Aerospace Engineer, Engine Certification Office, FAA, Engine & Propeller Directorate... signed the comment on behalf of an association, business, labor union, etc.). You may review the DOT's...
Code of Federal Regulations, 2011 CFR
2011-10-01
... CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS General 36.102 Definitions. As used in this part— Contract is intended to refer to a contract for construction or a contract for architect-engineer services..., structural, electrical, mechanical, and fire protection), producing the technical specifications and drawings...
Code of Federal Regulations, 2012 CFR
2012-10-01
... CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS General 36.102 Definitions. As used in this part— Contract is intended to refer to a contract for construction or a contract for architect-engineer services..., structural, electrical, mechanical, and fire protection), producing the technical specifications and drawings...
Code of Federal Regulations, 2014 CFR
2014-10-01
... CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS General 36.102 Definitions. As used in this part— Contract is intended to refer to a contract for construction or a contract for architect-engineer services..., structural, electrical, mechanical, and fire protection), producing the technical specifications and drawings...
Code of Federal Regulations, 2010 CFR
2010-10-01
... CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS General 36.102 Definitions. As used in this part— Contract is intended to refer to a contract for construction or a contract for architect-engineer services..., structural, electrical, mechanical, and fire protection), producing the technical specifications and drawings...
Code of Federal Regulations, 2013 CFR
2013-10-01
... CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS General 36.102 Definitions. As used in this part— Contract is intended to refer to a contract for construction or a contract for architect-engineer services..., structural, electrical, mechanical, and fire protection), producing the technical specifications and drawings...
21. POWER ROOM INTERIOR, DETAIL OF CATERPILLAR DIESEL ENGINE DIRECTLY ...
21. POWER ROOM INTERIOR, DETAIL OF CATERPILLAR DIESEL ENGINE DIRECTLY CONNECTED TO GENERAL ELECTRIC 15 KW DC GENERATOR (ON LEFT), 110 VOLTS, 136 AMPS, 1200 RPM. INSTALLED 1942. - Death Valley Ranch, Power House, Death Valley Junction, Inyo County, CA
General Electric TG-180 Turbojet in the Altitude Wind Tunnel
1947-09-21
A General Electric TG-180 turbojet installed in the Altitude Wind Tunnel at the National Advisory Committee for Aeronautics (NACA) Lewis Flight Propulsion Laboratory. In 1943 the military asked General Electric to develop an axial-flow jet engine which became the TG-180. The military understood that the TG-180 would not be ready during World War II but recognized the axial-flow compressor’s long-term potential. Although the engine was bench tested in April 1944, it was not flight tested until February 1946. The TG-180 was brought to the Altitude Wind Tunnel in 1945 for a series of investigations. The studies, which continued intermittently into 1948, analyzed an array of performance issues. NACA modifications steadily improved the TG-180’s performance, including the first successful use of an afterburner. The Lewis researchers studied a 29-inch diameter afterburner over a range of altitude conditions using several different types of flameholders and fuel systems. Lewis researchers concluded that a three-stage flameholder with its largest stage upstream was the best burner configuration. Although the TG-180 (also known as the J35) was not the breakthrough engine that the military had hoped for, it did power the Douglas D-558-I Skystreak to a world speed record on August 20, 1947. The engines were also used on the Republic F-84 Thunderjet and the Northrup F-89 Scorpion.
High Bypass Turbofan Component Development. Phase II. Detailed Design.
1979-08-01
Selecting Blade Thickness for Bird Strike 46 27. Method for Selecting Blade Airfoil Attachment 49 AIRCRAF ENGINE GROUP IV GENERAL ELECTRIC COMPANY...reserves, the replacement aircraft must have a fuel efficient engine as the propulsion system, i. e., * modern turbofan engine . Technology in the large... turbofan engines has been well demonstrated, but little has been done in the size applicable to a twin- engine primary trainer aircraft . Today, there is
The Electron Runaround: Understanding Electric Circuit Basics through a Classroom Activity
ERIC Educational Resources Information Center
Singh, Vandana
2010-01-01
Several misconceptions abound among college students taking their first general physics course, and to some extent pre-engineering physics students, regarding the physics and applications of electric circuits. Analogies used in textbooks, such as those that liken an electric circuit to a piped closed loop of water driven by a water pump, do not…
46 CFR 111.12-11 - Generator protection.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Generator protection. 111.12-11 Section 111.12-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-11 Generator protection. (a...
46 CFR 111.33-5 - Installation.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...
46 CFR 111.33-5 - Installation.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...
46 CFR 111.12-11 - Generator protection.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Generator protection. 111.12-11 Section 111.12-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-11 Generator protection. (a...
46 CFR 111.33-5 - Installation.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...
46 CFR 111.33-5 - Installation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...
46 CFR 111.12-11 - Generator protection.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Generator protection. 111.12-11 Section 111.12-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-11 Generator protection. (a...
46 CFR 111.33-5 - Installation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...
78 FR 21578 - Airworthiness Directives; General Electric Company Turbofan Engines
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-11
... Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of proposed... Company (GE) model GEnx-2B67 and GEnx-2B67B turbofan engines with booster anti-ice (BAI) air duct, part... GE model GEnx-2B67 and GEnx- 2B67B turbofan engines with BAI air duct, P/N 2469M32G01, and support...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-14
... installing software version 8.2.Q1 to the engine electronic control unit (ECU), which increases the engine's... proposed AD would require the removal of the affected ECUs from service. We are proposing this AD to... software version 8.2.Q1 to the ECU, which increases the engine's margin to flameout. That AD was prompted...
Hybrid Vehicle Technologies and their potential for reducing oil use
NASA Astrophysics Data System (ADS)
German, John
2006-04-01
Vehicles with hybrid gasoline-electric powertrains are starting to gain market share. Current hybrid vehicles add an electric motor, battery pack, and power electronics to the conventional powertrain. A variety of engine/motor configurations are possible, each with advantages and disadvantages. In general, efficiency is improved due to engine shut-off at idle, capture of energy during deceleration that is normally lost as heat in the brakes, downsizing of the conventional engine, and, in some cases, propulsion on the electric motor alone. Ongoing increases in hybrid market share are dependent on cost reduction, especially the battery pack, efficiency synergies with other vehicle technologies, use of the high electric power to provide features desired by customers, and future fuel price and availability. Potential barriers include historically low fuel prices, high discounting of the fuel savings by new vehicle purchasers, competing technologies, and tradeoffs with other factors desired by customers, such as performance, utility, safety, and luxury features.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Enclosures. 111.50-7 Section 111.50-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-7 Enclosures. (a) Each enclosure of an overcurrent protective...
46 CFR 111.79-15 - Receptacles for refrigerated containers.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Receptacles for refrigerated containers. 111.79-15 Section 111.79-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Receptacles § 111.79-15 Receptacles for refrigerated containers...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Enclosure. 111.40-5 Section 111.40-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Panelboards § 111.40-5 Enclosure. Each panelboard must have a noncombustible enclosure that meets...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Enclosure. 111.40-5 Section 111.40-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Panelboards § 111.40-5 Enclosure. Each panelboard must have a noncombustible enclosure that meets...
46 CFR 111.50-9 - Disconnecting and guarding.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Disconnecting and guarding. 111.50-9 Section 111.50-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-9 Disconnecting and guarding. Disconnecting and...
46 CFR 111.50-9 - Disconnecting and guarding.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Disconnecting and guarding. 111.50-9 Section 111.50-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-9 Disconnecting and guarding. Disconnecting and...
46 CFR 111.50-9 - Disconnecting and guarding.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Disconnecting and guarding. 111.50-9 Section 111.50-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-9 Disconnecting and guarding. Disconnecting and...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Enclosures. 111.50-7 Section 111.50-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-7 Enclosures. (a) Each enclosure of an overcurrent protective...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Enclosure. 111.40-5 Section 111.40-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Panelboards § 111.40-5 Enclosure. Each panelboard must have a noncombustible enclosure that meets...
46 CFR 111.79-15 - Receptacles for refrigerated containers.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Receptacles for refrigerated containers. 111.79-15 Section 111.79-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Receptacles § 111.79-15 Receptacles for refrigerated containers...
46 CFR 111.79-15 - Receptacles for refrigerated containers.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Receptacles for refrigerated containers. 111.79-15 Section 111.79-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Receptacles § 111.79-15 Receptacles for refrigerated containers...
46 CFR 111.50-9 - Disconnecting and guarding.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Disconnecting and guarding. 111.50-9 Section 111.50-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-9 Disconnecting and guarding. Disconnecting and...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Enclosure. 111.40-5 Section 111.40-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Panelboards § 111.40-5 Enclosure. Each panelboard must have a noncombustible enclosure that meets...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Enclosures. 111.50-7 Section 111.50-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-7 Enclosures. (a) Each enclosure of an overcurrent protective...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Enclosure. 111.40-5 Section 111.40-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Panelboards § 111.40-5 Enclosure. Each panelboard must have a noncombustible enclosure that meets...
46 CFR 111.79-15 - Receptacles for refrigerated containers.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Receptacles for refrigerated containers. 111.79-15 Section 111.79-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Receptacles § 111.79-15 Receptacles for refrigerated containers...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Enclosures. 111.50-7 Section 111.50-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-7 Enclosures. (a) Each enclosure of an overcurrent protective...
46 CFR 111.30-29 - Emergency switchboards.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Emergency switchboards. 111.30-29 Section 111.30-29 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-29 Emergency switchboards. (a) Each emergency generator must...
46 CFR 111.12-13 - Propulsion generator protection.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Propulsion generator protection. 111.12-13 Section 111.12-13 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-13 Propulsion generator...
46 CFR 111.12-13 - Propulsion generator protection.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Propulsion generator protection. 111.12-13 Section 111.12-13 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-13 Propulsion generator...
46 CFR 111.12-13 - Propulsion generator protection.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Propulsion generator protection. 111.12-13 Section 111.12-13 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-13 Propulsion generator...
46 CFR 111.12-13 - Propulsion generator protection.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Propulsion generator protection. 111.12-13 Section 111.12-13 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-13 Propulsion generator...
46 CFR 111.12-13 - Propulsion generator protection.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Propulsion generator protection. 111.12-13 Section 111.12-13 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-13 Propulsion generator...
46 CFR 111.75-20 - Lighting fixtures.
Code of Federal Regulations, 2010 CFR
2010-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Lighting Circuits and Protection § 111.75-20 Lighting fixtures. (a) The construction of each... connection box for a circuit other than the branch circuit supplying the fixture. (d) Lighting fixtures must...
46 CFR 111.105-1 - Applicability; definition.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Applicability; definition. 111.105-1 Section 111.105-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-1 Applicability; definition. This subpart applies to...
46 CFR 111.101-1 - Applicability.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Applicability. 111.101-1 Section 111.101-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Submersible Motor-Driven Bilge Pumps § 111.101-1 Applicability. This subpart applies to each...
Code of Federal Regulations, 2014 CFR
2014-10-01
... HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous... cargoes. (a) This section applies to locations surrounding the storage and handling of combustible liquid... hazardous locations in § 111.106-9 of this subpart apply. ...
46 CFR 111.101-1 - Applicability.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Applicability. 111.101-1 Section 111.101-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Submersible Motor-Driven Bilge Pumps § 111.101-1 Applicability. This subpart applies to each...
46 CFR 111.101-1 - Applicability.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Applicability. 111.101-1 Section 111.101-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Submersible Motor-Driven Bilge Pumps § 111.101-1 Applicability. This subpart applies to each...
46 CFR 111.101-1 - Applicability.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Applicability. 111.101-1 Section 111.101-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Submersible Motor-Driven Bilge Pumps § 111.101-1 Applicability. This subpart applies to each...
46 CFR 111.101-1 - Applicability.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Applicability. 111.101-1 Section 111.101-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Submersible Motor-Driven Bilge Pumps § 111.101-1 Applicability. This subpart applies to each...
40 CFR 86.1721-99 - Application for certification.
Code of Federal Regulations, 2010 CFR
2010-07-01
.... (6) For electric and hybrid electric vehicles, identification of the energy usage in kilowatt-hours... PROGRAMS (CONTINUED) CONTROL OF EMISSIONS FROM NEW AND IN-USE HIGHWAY VEHICLES AND ENGINES (CONTINUED) General Provisions for the Voluntary National Low Emission Vehicle Program for Light-Duty Vehicles and...
46 CFR 111.105-1 - Applicability; definition.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Applicability; definition. 111.105-1 Section 111.105-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-1 Applicability; definition. This subpart applies to...
Energy Efficient Engine core design and performance report
NASA Technical Reports Server (NTRS)
Stearns, E. Marshall
1982-01-01
The Energy Efficient Engine (E3) is a NASA program to develop fuel saving technology for future large transport aircraft engines. Testing of the General Electric E3 core showed that the core component performance and core system performance necessary to meet the program goals can be achieved. The E3 core design and test results are described.
46 CFR 112.40-1 - General requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false General requirements. 112.40-1 Section 112.40-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Alternating-Current Temporary Source of Supply § 112.40-1 General requirements...
46 CFR 112.40-1 - General requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false General requirements. 112.40-1 Section 112.40-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Alternating-Current Temporary Source of Supply § 112.40-1 General requirements...
46 CFR 112.40-1 - General requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false General requirements. 112.40-1 Section 112.40-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Alternating-Current Temporary Source of Supply § 112.40-1 General requirements...
46 CFR 112.40-1 - General requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false General requirements. 112.40-1 Section 112.40-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Alternating-Current Temporary Source of Supply § 112.40-1 General requirements...
46 CFR 112.40-1 - General requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false General requirements. 112.40-1 Section 112.40-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Alternating-Current Temporary Source of Supply § 112.40-1 General requirements...
40. 1911 ELECTRIC MOTOR INSTALLATION: Photocopy of July 1911 photograph ...
40. 1911 ELECTRIC MOTOR INSTALLATION: Photocopy of July 1911 photograph showing the installed 600hp General Electric motor at the Washington and Mason Streets powerhouse. View towards the south wall of the first floor. Note the engineer's shack and switchboard behind the motor and its pinion gear. - San Francisco Cable Railway, Washington & Mason Streets, San Francisco, San Francisco County, CA
7 CFR 1726.23 - Qualification of bidders.
Code of Federal Regulations, 2012 CFR
2012-01-01
... AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES General § 1726.23 Qualification of bidders. (a) Qualified bidder list (QBL). The borrower shall (acting through its engineer, if applicable... bidder. (b) Conflict of interest. If there is a relationship between the borrower or engineer and a...
7 CFR 1726.23 - Qualification of bidders.
Code of Federal Regulations, 2013 CFR
2013-01-01
... AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES General § 1726.23 Qualification of bidders. (a) Qualified bidder list (QBL). The borrower shall (acting through its engineer, if applicable... bidder. (b) Conflict of interest. If there is a relationship between the borrower or engineer and a...
7 CFR 1726.23 - Qualification of bidders.
Code of Federal Regulations, 2011 CFR
2011-01-01
... AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES General § 1726.23 Qualification of bidders. (a) Qualified bidder list (QBL). The borrower shall (acting through its engineer, if applicable... bidder. (b) Conflict of interest. If there is a relationship between the borrower or engineer and a...
7 CFR 1726.23 - Qualification of bidders.
Code of Federal Regulations, 2010 CFR
2010-01-01
... AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES General § 1726.23 Qualification of bidders. (a) Qualified bidder list (QBL). The borrower shall (acting through its engineer, if applicable... bidder. (b) Conflict of interest. If there is a relationship between the borrower or engineer and a...
7 CFR 1726.23 - Qualification of bidders.
Code of Federal Regulations, 2014 CFR
2014-01-01
... AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES General § 1726.23 Qualification of bidders. (a) Qualified bidder list (QBL). The borrower shall (acting through its engineer, if applicable... bidder. (b) Conflict of interest. If there is a relationship between the borrower or engineer and a...
Electrically heated particulate filter regeneration using hydrocarbon adsorbents
Gonze, Eugene V [Pinckney, MI; Ament, Frank [Troy, MI
2011-02-01
An exhaust system that processes exhaust generated by an engine is provided. The system generally includes a particulate filter (PF) that filters particulates from the exhaust wherein an upstream end of the PF receives exhaust from the engine. A grid of electrically resistive material selectively heats exhaust passing through the upstream end to initiate combustion of particulates within the PF. A hydrocarbon adsorbent coating applied to the PF releases hydrocarbons into the exhaust to increase a temperature of the combustion of the particulates within the PF.
Electrically heated particulate filter embedded heater design
Gonze, Eugene V.; Chapman, Mark R.
2014-07-01
An exhaust system that processes exhaust generated by an engine is provided. The system generally includes a particulate filter (PF) that filters particulates from the exhaust wherein an upstream end of the PF receives exhaust from the engine and wherein an upstream surface of the particulate filter includes machined grooves. A grid of electrically resistive material is inserted into the machined grooves of the exterior upstream surface of the PF and selectively heats exhaust passing through the grid to initiate combustion of particulates within the PF.
46 CFR 111.33-3 - Nameplate data.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Nameplate data. 111.33-3 Section 111.33-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-3 Nameplate data. (a) Each semiconductor rectifier...
46 CFR 111.79-9 - Transmitting power between receptacles.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Transmitting power between receptacles. 111.79-9 Section 111.79-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Receptacles § 111.79-9 Transmitting power between receptacles. (a) If...
46 CFR 111.30-1 - Location and installation.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Location and installation. 111.30-1 Section 111.30-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-1 Location and installation. Each switchboard must meet the...
46 CFR 111.30-5 - Construction.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Construction. 111.30-5 Section 111.30-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-5 Construction. (a) All low voltage and medium voltage switchboards (as low...
46 CFR 111.79-9 - Transmitting power between receptacles.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Transmitting power between receptacles. 111.79-9 Section 111.79-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Receptacles § 111.79-9 Transmitting power between receptacles. (a) If...
46 CFR 111.30-5 - Construction.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Construction. 111.30-5 Section 111.30-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-5 Construction. (a) All low voltage and medium voltage switchboards (as low...
46 CFR 111.30-5 - Construction.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Construction. 111.30-5 Section 111.30-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-5 Construction. (a) All low voltage and medium voltage switchboards (as low...
46 CFR 111.12-9 - Generator cables.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Generator cables. 111.12-9 Section 111.12-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-9 Generator cables. (a) The current-carrying capacity...
46 CFR 111.79-9 - Transmitting power between receptacles.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Transmitting power between receptacles. 111.79-9 Section 111.79-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Receptacles § 111.79-9 Transmitting power between receptacles. (a) If...
46 CFR 111.30-25 - Alternating-current ship's service switchboards.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Alternating-current ship's service switchboards. 111.30-25 Section 111.30-25 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-25 Alternating-current ship's service...
46 CFR 111.30-11 - Deck coverings.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Deck coverings. 111.30-11 Section 111.30-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-11 Deck coverings. Non-conducting deck coverings, such as non-conducting...
46 CFR 111.12-9 - Generator cables.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Generator cables. 111.12-9 Section 111.12-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-9 Generator cables. (a) The current-carrying capacity...
46 CFR 111.30-11 - Deck coverings.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Deck coverings. 111.30-11 Section 111.30-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-11 Deck coverings. Non-conducting deck coverings, such as non-conducting...
46 CFR 111.30-1 - Location and installation.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Location and installation. 111.30-1 Section 111.30-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-1 Location and installation. Each switchboard must meet the...
46 CFR 111.30-1 - Location and installation.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Location and installation. 111.30-1 Section 111.30-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-1 Location and installation. Each switchboard must meet the...
46 CFR 111.30-11 - Deck coverings.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Deck coverings. 111.30-11 Section 111.30-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-11 Deck coverings. Non-conducting deck coverings, such as non-conducting...
46 CFR 111.30-11 - Deck coverings.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Deck coverings. 111.30-11 Section 111.30-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-11 Deck coverings. Non-conducting deck coverings, such as non-conducting...
46 CFR 111.30-1 - Location and installation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Location and installation. 111.30-1 Section 111.30-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-1 Location and installation. Each switchboard must meet the...
46 CFR 111.30-1 - Location and installation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Location and installation. 111.30-1 Section 111.30-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-1 Location and installation. Each switchboard must meet the...
46 CFR 111.30-5 - Construction.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Construction. 111.30-5 Section 111.30-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-5 Construction. (a) All low voltage and medium voltage switchboards (as low...
46 CFR 111.33-3 - Nameplate data.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Nameplate data. 111.33-3 Section 111.33-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-3 Nameplate data. (a) Each semiconductor rectifier...
46 CFR 111.79-9 - Transmitting power between receptacles.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Transmitting power between receptacles. 111.79-9 Section 111.79-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Receptacles § 111.79-9 Transmitting power between receptacles. (a) If...
46 CFR 111.79-9 - Transmitting power between receptacles.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Transmitting power between receptacles. 111.79-9 Section 111.79-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Receptacles § 111.79-9 Transmitting power between receptacles. (a) If...
46 CFR 111.12-9 - Generator cables.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Generator cables. 111.12-9 Section 111.12-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-9 Generator cables. (a) The current-carrying capacity...
46 CFR 111.30-11 - Deck coverings.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Deck coverings. 111.30-11 Section 111.30-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-11 Deck coverings. Non-conducting deck coverings, such as non-conducting...
46 CFR 111.12-9 - Generator cables.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Generator cables. 111.12-9 Section 111.12-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-9 Generator cables. (a) The current-carrying capacity...
46 CFR 111.30-5 - Construction.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Construction. 111.30-5 Section 111.30-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-5 Construction. (a) All low voltage and medium voltage switchboards (as low...
46 CFR 111.33-3 - Nameplate data.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Nameplate data. 111.33-3 Section 111.33-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-3 Nameplate data. (a) Each semiconductor rectifier...
46 CFR 111.30-25 - Alternating-current ship's service switchboards.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Alternating-current ship's service switchboards. 111.30-25 Section 111.30-25 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-25 Alternating-current ship's service...
46 CFR 111.30-25 - Alternating-current ship's service switchboards.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Alternating-current ship's service switchboards. 111.30-25 Section 111.30-25 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-25 Alternating-current ship's service...
46 CFR 111.105-15 - Additional methods of protection.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Additional methods of protection. 111.105-15 Section 111.105-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-15 Additional methods of protection...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Appliances. 111.77-3 Section 111.77-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL..., must meet UL safety and construction standards or equivalent standards under § 110.20-1 of this chapter...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Appliances. 111.77-3 Section 111.77-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL..., must meet UL safety and construction standards or equivalent standards under § 110.20-1 of this chapter...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Appliances. 111.77-3 Section 111.77-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL..., must meet UL safety and construction standards or equivalent standards under § 110.20-1 of this chapter...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Appliances. 111.77-3 Section 111.77-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL..., must meet UL safety and construction standards or equivalent standards under § 110.20-1 of this chapter...
46 CFR 111.105-5 - System integrity.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false System integrity. 111.105-5 Section 111.105-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-5 System integrity. In order to maintain system integrity, each...
46 CFR 111.105-5 - System integrity.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false System integrity. 111.105-5 Section 111.105-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-5 System integrity. In order to maintain system integrity, each...
46 CFR 111.05-25 - Ungrounded systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Ungrounded systems. 111.05-25 Section 111.05-25 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Equipment Ground, Ground Detection, and Grounded Systems § 111.05-25 Ungrounded systems. Each...
46 CFR 111.05-25 - Ungrounded systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Ungrounded systems. 111.05-25 Section 111.05-25 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Equipment Ground, Ground Detection, and Grounded Systems § 111.05-25 Ungrounded systems. Each...
46 CFR 111.105-5 - System integrity.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false System integrity. 111.105-5 Section 111.105-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-5 System integrity. In order to maintain system integrity, each...
46 CFR 111.05-25 - Ungrounded systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Ungrounded systems. 111.05-25 Section 111.05-25 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Equipment Ground, Ground Detection, and Grounded Systems § 111.05-25 Ungrounded systems. Each...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Switches. 111.105-19 Section 111.105-19 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL... controls any explosionproof or flameproof equipment, under § 111.105-19 must have a pole for each...
46 CFR 111.75-1 - Lighting feeders.
Code of Federal Regulations, 2010 CFR
2010-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Lighting Circuits and Protection § 111.75-1 Lighting feeders. (a) Passenger vessels. On a... lighting, feeders, and branch circuits are in subpart 112.43 of this chapter. [CGD 74-125A, 47 FR 15236...
46 CFR 111.05-17 - Generation and distribution system grounding.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Section 111.05-17 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Equipment Ground, Ground Detection, and Grounded Systems § 111.05-17... must: (a) Be grounded at the generator switchboard, except the neutral of an emergency power generation...
46 CFR 111.05-15 - Neutral grounding.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Neutral grounding. 111.05-15 Section 111.05-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL... propulsion, power, lighting, or distribution system having a neutral bus or conductor must have the neutral...
46 CFR 111.75-16 - Lighting of survival craft and rescue boats.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Section 111.75-16 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Lighting Circuits and Protection § 111.75-16 Lighting of survival... be adequately illuminated by lighting supplied from the emergency power source. (b) The arrangement...
46 CFR 111.05-15 - Neutral grounding.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Neutral grounding. 111.05-15 Section 111.05-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL... propulsion, power, lighting, or distribution system having a neutral bus or conductor must have the neutral...
46 CFR 111.05-17 - Generation and distribution system grounding.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Section 111.05-17 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Equipment Ground, Ground Detection, and Grounded Systems § 111.05-17... must: (a) Be grounded at the generator switchboard, except the neutral of an emergency power generation...
46 CFR 111.05-15 - Neutral grounding.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Neutral grounding. 111.05-15 Section 111.05-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL... propulsion, power, lighting, or distribution system having a neutral bus or conductor must have the neutral...
46 CFR 111.05-15 - Neutral grounding.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Neutral grounding. 111.05-15 Section 111.05-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL... propulsion, power, lighting, or distribution system having a neutral bus or conductor must have the neutral...
46 CFR 111.05-15 - Neutral grounding.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Neutral grounding. 111.05-15 Section 111.05-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL... propulsion, power, lighting, or distribution system having a neutral bus or conductor must have the neutral...
46 CFR 111.05-17 - Generation and distribution system grounding.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Section 111.05-17 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Equipment Ground, Ground Detection, and Grounded Systems § 111.05-17... must: (a) Be grounded at the generator switchboard, except the neutral of an emergency power generation...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Switches. 111.105-19 Section 111.105-19 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-19 Switches. A switch that is explosionproof or flameproof, or that...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Switches. 111.105-19 Section 111.105-19 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-19 Switches. A switch that is explosionproof or flameproof, or that...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Switches. 111.105-19 Section 111.105-19 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-19 Switches. A switch that is explosionproof or flameproof, or that...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Switches. 111.105-19 Section 111.105-19 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-19 Switches. A switch that is explosionproof or flameproof, or that...
46 CFR 111.10-1 - Definitions.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Definitions. 111.10-1 Section 111.10-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL... organic peroxides and Class 4.1 self-reactive substances, and other industrial type loads are not included...
46 CFR 111.10-1 - Definitions.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Definitions. 111.10-1 Section 111.10-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL... organic peroxides and Class 4.1 self-reactive substances, and other industrial type loads are not included...
46 CFR 111.10-1 - Definitions.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Definitions. 111.10-1 Section 111.10-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL... organic peroxides and Class 4.1 self-reactive substances, and other industrial type loads are not included...
46 CFR 111.10-1 - Definitions.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Definitions. 111.10-1 Section 111.10-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL... organic peroxides and Class 4.1 self-reactive substances, and other industrial type loads are not included...
46 CFR 111.10-1 - Definitions.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Definitions. 111.10-1 Section 111.10-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL... organic peroxides and Class 4.1 self-reactive substances, and other industrial type loads are not included...
46 CFR 111.54-3 - Remote control.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Remote control. 111.54-3 Section 111.54-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Circuit Breakers § 111.54-3 Remote control. Remotely controlled circuit breakers must have local...
46 CFR 111.54-3 - Remote control.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Remote control. 111.54-3 Section 111.54-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Circuit Breakers § 111.54-3 Remote control. Remotely controlled circuit breakers must have local...
46 CFR 111.54-3 - Remote control.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Remote control. 111.54-3 Section 111.54-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Circuit Breakers § 111.54-3 Remote control. Remotely controlled circuit breakers must have local...
46 CFR 111.54-3 - Remote control.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Remote control. 111.54-3 Section 111.54-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Circuit Breakers § 111.54-3 Remote control. Remotely controlled circuit breakers must have local...
46 CFR 111.54-3 - Remote control.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Remote control. 111.54-3 Section 111.54-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Circuit Breakers § 111.54-3 Remote control. Remotely controlled circuit breakers must have local...
46 CFR 111.99-1 - Applicability.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Applicability. 111.99-1 Section 111.99-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Fire Door Holding and Release Systems § 111.99-1 Applicability. This subpart applies to fire door...
46 CFR 111.99-1 - Applicability.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Applicability. 111.99-1 Section 111.99-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Fire Door Holding and Release Systems § 111.99-1 Applicability. This subpart applies to fire door...
46 CFR 111.99-1 - Applicability.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Applicability. 111.99-1 Section 111.99-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Fire Door Holding and Release Systems § 111.99-1 Applicability. This subpart applies to fire door...
46 CFR 111.99-1 - Applicability.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Applicability. 111.99-1 Section 111.99-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Fire Door Holding and Release Systems § 111.99-1 Applicability. This subpart applies to fire door...
46 CFR 111.99-1 - Applicability.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Applicability. 111.99-1 Section 111.99-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Fire Door Holding and Release Systems § 111.99-1 Applicability. This subpart applies to fire door...
46 CFR 111.30-25 - Alternating-current ship's service switchboards.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-25 Section 111.30-25 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-25 Alternating-current ship's service... regulator unit acting on the exciter field, each switchboard must have: (1) A generator field rheostat; (2...
46 CFR 111.30-25 - Alternating-current ship's service switchboards.
Code of Federal Regulations, 2011 CFR
2011-10-01
...-25 Section 111.30-25 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-25 Alternating-current ship's service... regulator unit acting on the exciter field, each switchboard must have: (1) A generator field rheostat; (2...
46 CFR 111.99-3 - Definitions.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Definitions. 111.99-3 Section 111.99-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Fire Door Holding and Release Systems § 111.99-3 Definitions. As used in this subpart— Central...
46 CFR 111.33-3 - Nameplate data.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Nameplate data. 111.33-3 Section 111.33-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-3 Nameplate data. (a) Each semiconductor rectifier...
46 CFR 111.33-3 - Nameplate data.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Nameplate data. 111.33-3 Section 111.33-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-3 Nameplate data. (a) Each semiconductor rectifier...
46 CFR 111.105-3 - General requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS... reference; see 46 CFR 110.10-1), and with either Articles 500 through 505 of NFPA NEC 2002 (incorporated by... articles, and when installed fittings are approved for the specific hazardous location and the cable type...
46 CFR 111.52-3 - Systems below 1500 kilowatts.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Calculation of Short-Circuit Currents § 111.52-3 Systems below 1500 kilowatts. The... maximum short-circuit current of a direct current system must be assumed to be 10 times the aggregate...
46 CFR 111.52-3 - Systems below 1500 kilowatts.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Calculation of Short-Circuit Currents § 111.52-3 Systems below 1500 kilowatts. The... maximum short-circuit current of a direct current system must be assumed to be 10 times the aggregate...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false General. 112.55-1 Section 112.55-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Storage Battery Installation § 112.55-1 General. Each storage battery installation must meet Subpart 111...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false General. 112.55-1 Section 112.55-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Storage Battery Installation § 112.55-1 General. Each storage battery installation must meet Subpart 111...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false General. 112.55-1 Section 112.55-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Storage Battery Installation § 112.55-1 General. Each storage battery installation must meet Subpart 111...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false General. 112.55-1 Section 112.55-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Storage Battery Installation § 112.55-1 General. Each storage battery installation must meet Subpart 111...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false General. 112.55-1 Section 112.55-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Storage Battery Installation § 112.55-1 General. Each storage battery installation must meet Subpart 111...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-04
[email protected]ge.com . You may review copies of the referenced service information at the FAA, Engine..., February 26, 2009), for GE CF6-45 and CF6-50 series turbofan engines. That AD requires replacing LFCEN... that this proposed AD would affect 383 GE CF6-45 and CF6-50 series turbofan engines installed on...
Code of Federal Regulations, 2014 CFR
2014-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having an Automatically Connected Storage Battery as the Sole Emergency Power Source § 112.30-1 General. This subpart contains requirements applicable to emergency power installations having...
Code of Federal Regulations, 2012 CFR
2012-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having an Automatically Connected Storage Battery as the Sole Emergency Power Source § 112.30-1 General. This subpart contains requirements applicable to emergency power installations having...
Code of Federal Regulations, 2011 CFR
2011-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having an Automatically Connected Storage Battery as the Sole Emergency Power Source § 112.30-1 General. This subpart contains requirements applicable to emergency power installations having...
Code of Federal Regulations, 2010 CFR
2010-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having an Automatically Connected Storage Battery as the Sole Emergency Power Source § 112.30-1 General. This subpart contains requirements applicable to emergency power installations having...
Code of Federal Regulations, 2013 CFR
2013-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having an Automatically Connected Storage Battery as the Sole Emergency Power Source § 112.30-1 General. This subpart contains requirements applicable to emergency power installations having...
ERIC Educational Resources Information Center
International Federation for Documentation, The Hague (Netherlands). Committee on Classification Research.
In continuation of the "Cumulated UDC Supplement - 1964" published by the International Federation for Documentation, this document provides a cumulative supplement to the Universal Decimal Classification for 1965-1975. This third of five volumes lists new classification subdivisions in the following subject areas: (1) medical sciences; (2)…
46 CFR 110.20-1 - Equivalents.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Equivalents. 110.20-1 Section 110.20-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Equivalents... engineering evaluations and tests to demonstrate the equivalence of the substitute. [CGD 94-108, 61 FR 28275...
46 CFR 110.20-1 - Equivalents.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Equivalents. 110.20-1 Section 110.20-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Equivalents... engineering evaluations and tests to demonstrate the equivalence of the substitute. [CGD 94-108, 61 FR 28275...
46 CFR 110.20-1 - Equivalents.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Equivalents. 110.20-1 Section 110.20-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Equivalents... engineering evaluations and tests to demonstrate the equivalence of the substitute. [CGD 94-108, 61 FR 28275...
46 CFR 110.20-1 - Equivalents.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Equivalents. 110.20-1 Section 110.20-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Equivalents... engineering evaluations and tests to demonstrate the equivalence of the substitute. [CGD 94-108, 61 FR 28275...
46 CFR 110.20-1 - Equivalents.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Equivalents. 110.20-1 Section 110.20-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Equivalents... engineering evaluations and tests to demonstrate the equivalence of the substitute. [CGD 94-108, 61 FR 28275...
Electrically heated particulate filter enhanced ignition strategy
Gonze, Eugene V; Paratore, Jr., Michael J
2012-10-23
An exhaust system that processes exhaust generated by an engine is provided. The system generally includes a particulate filter (PF) that filters particulates from the exhaust wherein an upstream end of the PF receives exhaust from the engine. A grid of electrically resistive material is applied to an exterior upstream surface of the PF and selectively heats exhaust passing through the grid to initiate combustion of particulates within the PF. A catalyst coating applied to at least one of the PF and the grid. A control module estimates a temperature of the grid and controls the engine to produce a desired exhaust product to increase the temperature of the grid.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-11
... methods: Federal eRulemaking Portal: Go to http://www.regulations.gov . Follow the instructions for... Investigation of a General Electric Company (GE) CF34-10E turbofan engine experiencing high fan frame vibrations... likely to exist or develop in other products of the same type design. Proposed AD Requirements This...
46 CFR 111.40-1 - Panelboard standard.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Panelboard standard. 111.40-1 Section 111.40-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Panelboards § 111.40-1 Panelboard standard. Each panelboard must meet section 17.1 of IEEE 45-2002...
46 CFR 111.40-15 - Overcurrent device.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Overcurrent device. 111.40-15 Section 111.40-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Panelboards § 111.40-15 Overcurrent device. The total load on any overcurrent device located in a...
46 CFR 111.30-4 - Circuit breakers removable from the front.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Circuit breakers removable from the front. 111.30-4 Section 111.30-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-4 Circuit breakers removable from the front...
46 CFR 111.40-15 - Overcurrent device.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Overcurrent device. 111.40-15 Section 111.40-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Panelboards § 111.40-15 Overcurrent device. The total load on any overcurrent device located in a...
46 CFR 111.30-4 - Circuit breakers removable from the front.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Circuit breakers removable from the front. 111.30-4 Section 111.30-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-4 Circuit breakers removable from the front...
46 CFR 111.33-7 - Alarms and shutdowns.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Alarms and shutdowns. 111.33-7 Section 111.33-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-7 Alarms and shutdowns. Each power semiconductor...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Location. 111.40-7 Section 111.40-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Panelboards § 111.40-7 Location. Each panelboard must be accessible but not in a bunker or a cargo hold...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Purpose. 111.51-1 Section 111.51-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Coordination of Overcurrent Protective Devices § 111.51-1 Purpose. The purpose of this subpart is to provide...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Marking. 111.25-5 Section 111.25-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Motors § 111.25-5 Marking. (a) Each motor must have a marking or nameplate that meets either Section 430...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Rating. 111.40-13 Section 111.40-13 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Panelboards § 111.40-13 Rating. Each panelboard must have a current rating not less than the feeder circuit...
46 CFR 111.40-11 - Numbered switching unit and panelboard directory.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Numbered switching unit and panelboard directory. 111.40-11 Section 111.40-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Panelboards § 111.40-11 Numbered switching unit and...
46 CFR 111.79-3 - Grounding pole.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Grounding pole. 111.79-3 Section 111.79-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Receptacles § 111.79-3 Grounding pole. Each receptacle outlet that operates at 100 volts or more...
46 CFR 111.79-13 - Different voltages and power types.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Different voltages and power types. 111.79-13 Section 111.79-13 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Receptacles § 111.79-13 Different voltages and power types. If...
46 CFR 111.33-7 - Alarms and shutdowns.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Alarms and shutdowns. 111.33-7 Section 111.33-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-7 Alarms and shutdowns. Each power semiconductor...
46 CFR 111.40-9 - Locking device.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Locking device. 111.40-9 Section 111.40-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Panelboards § 111.40-9 Locking device. The door of each panelboard enclosure that is accessible to...
46 CFR 111.55-3 - Circuit connections.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Circuit connections. 111.55-3 Section 111.55-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switches § 111.55-3 Circuit connections. The load side of each circuit must be connected to the...
46 CFR 110.25-1 - Plans and information required for new construction.
Code of Federal Regulations, 2011 CFR
2011-10-01
....25-1 Section 110.25-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Plan Submittal § 110.25-1 Plans and information required for new construction... available at the point of application. (b) Electrical plant load analysis including connected loads and...
46 CFR 111.40-15 - Overcurrent device.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Overcurrent device. 111.40-15 Section 111.40-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Panelboards § 111.40-15 Overcurrent device. The total load on any overcurrent device located in a...