46 CFR 188.25-1 - Electrical engineering details.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 7 2012-10-01 2012-10-01 false Electrical engineering details. 188.25-1 Section 188.25... GENERAL PROVISIONS General Electrical Engineering Requirements § 188.25-1 Electrical engineering details. (a) The electrical engineering details shall be in accordance with subchapter J (Electrical...
46 CFR 188.25-1 - Electrical engineering details.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Electrical engineering details. 188.25-1 Section 188.25... GENERAL PROVISIONS General Electrical Engineering Requirements § 188.25-1 Electrical engineering details. (a) The electrical engineering details shall be in accordance with subchapter J (Electrical...
46 CFR 188.25-1 - Electrical engineering details.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 7 2014-10-01 2014-10-01 false Electrical engineering details. 188.25-1 Section 188.25... GENERAL PROVISIONS General Electrical Engineering Requirements § 188.25-1 Electrical engineering details. (a) The electrical engineering details shall be in accordance with subchapter J (Electrical...
46 CFR 188.25-1 - Electrical engineering details.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false Electrical engineering details. 188.25-1 Section 188.25... GENERAL PROVISIONS General Electrical Engineering Requirements § 188.25-1 Electrical engineering details. (a) The electrical engineering details shall be in accordance with subchapter J (Electrical...
46 CFR 188.25-1 - Electrical engineering details.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 7 2011-10-01 2011-10-01 false Electrical engineering details. 188.25-1 Section 188.25... GENERAL PROVISIONS General Electrical Engineering Requirements § 188.25-1 Electrical engineering details. (a) The electrical engineering details shall be in accordance with subchapter J (Electrical...
Designing, Implementing and Maintaining a First Year Project Course in Electrical Engineering
ERIC Educational Resources Information Center
Lillieskold, J.; Ostlund, S.
2008-01-01
Being a modern electrical engineer does not only require state of the art skills in areas such as transfer and processing of information, electronics, systems engineering, and biomedical electrical engineering; it also requires generic engineering skills such as oral and written communication, team building, interpersonal skills, and the ability…
46 CFR 70.25-1 - Electrical engineering details.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 3 2013-10-01 2013-10-01 false Electrical engineering details. 70.25-1 Section 70.25-1... General Electrical Engineering Requirements § 70.25-1 Electrical engineering details. All electrical engineering details and installations shall be designed and installed in accordance with subchapter J...
46 CFR 70.25-1 - Electrical engineering details.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 3 2010-10-01 2010-10-01 false Electrical engineering details. 70.25-1 Section 70.25-1... General Electrical Engineering Requirements § 70.25-1 Electrical engineering details. All electrical engineering details and installations shall be designed and installed in accordance with subchapter J...
46 CFR 90.25-1 - Electrical engineering details.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Electrical engineering details. 90.25-1 Section 90.25-1... PROVISIONS General Electrical Engineering Requirements § 90.25-1 Electrical engineering details. (a) All electrical engineering details and installations shall be designed and installed in accordance with...
46 CFR 90.25-1 - Electrical engineering details.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Electrical engineering details. 90.25-1 Section 90.25-1... PROVISIONS General Electrical Engineering Requirements § 90.25-1 Electrical engineering details. (a) All electrical engineering details and installations shall be designed and installed in accordance with...
46 CFR 70.25-1 - Electrical engineering details.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 3 2011-10-01 2011-10-01 false Electrical engineering details. 70.25-1 Section 70.25-1... General Electrical Engineering Requirements § 70.25-1 Electrical engineering details. All electrical engineering details and installations shall be designed and installed in accordance with subchapter J...
46 CFR 70.25-1 - Electrical engineering details.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 3 2014-10-01 2014-10-01 false Electrical engineering details. 70.25-1 Section 70.25-1... General Electrical Engineering Requirements § 70.25-1 Electrical engineering details. All electrical engineering details and installations shall be designed and installed in accordance with subchapter J...
46 CFR 70.25-1 - Electrical engineering details.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 3 2012-10-01 2012-10-01 false Electrical engineering details. 70.25-1 Section 70.25-1... General Electrical Engineering Requirements § 70.25-1 Electrical engineering details. All electrical engineering details and installations shall be designed and installed in accordance with subchapter J...
46 CFR 90.25-1 - Electrical engineering details.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Electrical engineering details. 90.25-1 Section 90.25-1... PROVISIONS General Electrical Engineering Requirements § 90.25-1 Electrical engineering details. (a) All electrical engineering details and installations shall be designed and installed in accordance with...
46 CFR 90.25-1 - Electrical engineering details.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Electrical engineering details. 90.25-1 Section 90.25-1... PROVISIONS General Electrical Engineering Requirements § 90.25-1 Electrical engineering details. (a) All electrical engineering details and installations shall be designed and installed in accordance with...
46 CFR 90.25-1 - Electrical engineering details.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Electrical engineering details. 90.25-1 Section 90.25-1... PROVISIONS General Electrical Engineering Requirements § 90.25-1 Electrical engineering details. (a) All electrical engineering details and installations shall be designed and installed in accordance with...
7 CFR 1788.11 - Minimum insurance requirements for contractors, engineers, and architects.
Code of Federal Regulations, 2014 CFR
2014-01-01
... REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.11 Minimum insurance requirements for contractors, engineers, and architects. (a..., engineers, and architects. 1788.11 Section 1788.11 Agriculture Regulations of the Department of Agriculture...
7 CFR 1788.11 - Minimum insurance requirements for contractors, engineers, and architects.
Code of Federal Regulations, 2010 CFR
2010-01-01
... REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.11 Minimum insurance requirements for contractors, engineers, and architects. (a..., engineers, and architects. 1788.11 Section 1788.11 Agriculture Regulations of the Department of Agriculture...
7 CFR 1788.11 - Minimum insurance requirements for contractors, engineers, and architects.
Code of Federal Regulations, 2012 CFR
2012-01-01
... REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.11 Minimum insurance requirements for contractors, engineers, and architects. (a..., engineers, and architects. 1788.11 Section 1788.11 Agriculture Regulations of the Department of Agriculture...
7 CFR 1788.11 - Minimum insurance requirements for contractors, engineers, and architects.
Code of Federal Regulations, 2013 CFR
2013-01-01
... REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.11 Minimum insurance requirements for contractors, engineers, and architects. (a..., engineers, and architects. 1788.11 Section 1788.11 Agriculture Regulations of the Department of Agriculture...
7 CFR 1788.11 - Minimum insurance requirements for contractors, engineers, and architects.
Code of Federal Regulations, 2011 CFR
2011-01-01
... REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.11 Minimum insurance requirements for contractors, engineers, and architects. (a..., engineers, and architects. 1788.11 Section 1788.11 Agriculture Regulations of the Department of Agriculture...
46 CFR 107.305 - Plans and information.
Code of Federal Regulations, 2013 CFR
2013-10-01
... systems. Marine Engineering (z) Plans required for marine engineering equipment and systems by Subchapter F of this chapter. Electrical Engineering (aa) Plans required for electrical engineering equipment... materials that do not conform to ABS or ASTM specifications, complete specifications, including chemical and...
46 CFR 91.55-5 - Plans and specifications required for new construction.
Code of Federal Regulations, 2010 CFR
2010-10-01
... systems. (e) Marine engineering. For plans required for marine engineering equipment and systems, see... electrical engineering, equipment and systems, see subchapter J (Electrical Engineering) of this chapter. (g... bottoms, etc., and including inboard and outboard profile. (b) Hull structure. 1 (1) *Inner Bottom Plating...
National Electrical Code in Power Engineering Course for Electrical Engineering Curriculum
ERIC Educational Resources Information Center
Azizur, Rahman M. M.
2011-01-01
In order to ensure the safety of their inhabitants and properties, the residential, industrial and business installations require complying with NEC (national electrical code) for electrical systems. Electrical design engineers and technicians rely heavily on these very important design guidelines. However, these design guidelines are not formally…
46 CFR 96.05-1 - Installation and details.
Code of Federal Regulations, 2013 CFR
2013-10-01
... CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communications Systems § 96.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or... be in accordance with the requirements of subchapter J (Electrical Engineering) of this chapter...
46 CFR 77.05-1 - Installation and details.
Code of Federal Regulations, 2014 CFR
2014-10-01
... MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communication Systems § 77.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or interior... accordance with the requirements of subchapter J (Electrical Engineering) of this chapter. Systems of this...
46 CFR 77.05-1 - Installation and details.
Code of Federal Regulations, 2012 CFR
2012-10-01
... MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communication Systems § 77.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or interior... accordance with the requirements of subchapter J (Electrical Engineering) of this chapter. Systems of this...
46 CFR 96.05-1 - Installation and details.
Code of Federal Regulations, 2012 CFR
2012-10-01
... CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communications Systems § 96.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or... be in accordance with the requirements of subchapter J (Electrical Engineering) of this chapter...
46 CFR 77.05-1 - Installation and details.
Code of Federal Regulations, 2010 CFR
2010-10-01
... MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communication Systems § 77.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or interior... accordance with the requirements of subchapter J (Electrical Engineering) of this chapter. Systems of this...
46 CFR 96.05-1 - Installation and details.
Code of Federal Regulations, 2014 CFR
2014-10-01
... CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communications Systems § 96.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or... be in accordance with the requirements of subchapter J (Electrical Engineering) of this chapter...
46 CFR 96.05-1 - Installation and details.
Code of Federal Regulations, 2011 CFR
2011-10-01
... CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communications Systems § 96.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or... be in accordance with the requirements of subchapter J (Electrical Engineering) of this chapter...
46 CFR 96.05-1 - Installation and details.
Code of Federal Regulations, 2010 CFR
2010-10-01
... CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communications Systems § 96.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or... be in accordance with the requirements of subchapter J (Electrical Engineering) of this chapter...
46 CFR 77.05-1 - Installation and details.
Code of Federal Regulations, 2011 CFR
2011-10-01
... MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communication Systems § 77.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or interior... accordance with the requirements of subchapter J (Electrical Engineering) of this chapter. Systems of this...
46 CFR 77.05-1 - Installation and details.
Code of Federal Regulations, 2013 CFR
2013-10-01
... MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communication Systems § 77.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or interior... accordance with the requirements of subchapter J (Electrical Engineering) of this chapter. Systems of this...
46 CFR 167.40-1 - Electrical installations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... (Electrical Engineering) of this chapter. (3) Institute of Electrical and Electronic Engineers, Inc. (IEEE... 46 Shipping 7 2011-10-01 2011-10-01 false Electrical installations. 167.40-1 Section 167.40-1... SHIPS Certain Equipment Requirements § 167.40-1 Electrical installations. (a) Except as otherwise...
46 CFR 167.40-1 - Electrical installations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... (Electrical Engineering) of this chapter. (3) Institute of Electrical and Electronic Engineers, Inc. (IEEE... 46 Shipping 7 2012-10-01 2012-10-01 false Electrical installations. 167.40-1 Section 167.40-1... SHIPS Certain Equipment Requirements § 167.40-1 Electrical installations. (a) Except as otherwise...
46 CFR 167.40-1 - Electrical installations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... (Electrical Engineering) of this chapter. (3) Institute of Electrical and Electronic Engineers, Inc. (IEEE... 46 Shipping 7 2014-10-01 2014-10-01 false Electrical installations. 167.40-1 Section 167.40-1... SHIPS Certain Equipment Requirements § 167.40-1 Electrical installations. (a) Except as otherwise...
46 CFR 167.40-1 - Electrical installations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... (Electrical Engineering) of this chapter. (3) Institute of Electrical and Electronic Engineers, Inc. (IEEE... 46 Shipping 7 2013-10-01 2013-10-01 false Electrical installations. 167.40-1 Section 167.40-1... SHIPS Certain Equipment Requirements § 167.40-1 Electrical installations. (a) Except as otherwise...
46 CFR 111.95-3 - General requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false General requirements. 111.95-3 Section 111.95-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-3 General requirements. (a) Each electrical...
46 CFR 111.95-3 - General requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false General requirements. 111.95-3 Section 111.95-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-3 General requirements. (a) Each electrical...
46 CFR 111.95-3 - General requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false General requirements. 111.95-3 Section 111.95-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-3 General requirements. (a) Each electrical...
46 CFR 111.95-3 - General requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false General requirements. 111.95-3 Section 111.95-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-3 General requirements. (a) Each electrical...
46 CFR 111.95-3 - General requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false General requirements. 111.95-3 Section 111.95-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-3 General requirements. (a) Each electrical...
78 FR 24671 - Airworthiness Directives; General Electric Company Turbofan Engines
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-26
... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA... certain General Electric Company (GE) CF6-80C2 series turbofan engines. That AD currently requires.../B1F/B2F/B4F/B6F/B7F/D1F turbofan engines with any of the following installed: (1) Fuel tube, part...
46 CFR 111.87-3 - General requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false General requirements. 111.87-3 Section 111.87-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Air Heating Equipment § 111.87-3 General requirements. (a) Each electric heater must meet...
46 CFR 111.87-3 - General requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false General requirements. 111.87-3 Section 111.87-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Air Heating Equipment § 111.87-3 General requirements. (a) Each electric heater must meet...
46 CFR 111.87-3 - General requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false General requirements. 111.87-3 Section 111.87-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Air Heating Equipment § 111.87-3 General requirements. (a) Each electric heater must meet...
46 CFR 111.87-3 - General requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false General requirements. 111.87-3 Section 111.87-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Air Heating Equipment § 111.87-3 General requirements. (a) Each electric heater must meet...
46 CFR 111.87-3 - General requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false General requirements. 111.87-3 Section 111.87-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Air Heating Equipment § 111.87-3 General requirements. (a) Each electric heater must meet...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-22
... professions including consultant economists, lawyers, and electrical engineers. The costs of engaging these... economist, lawyer, and electrical engineer according to Salary.com data. (See http://salary.com ). Public... electrical engineer according to Salary.com data, for the hours required in 18 CFR 35.37(a) for market power...
46 CFR 111.95-1 - Applicability.
Code of Federal Regulations, 2012 CFR
2012-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-1 Applicability. (a) The electric installation of each electric power-operated boat winch must meet the requirements in this subpart, except that limit...
46 CFR 111.95-1 - Applicability.
Code of Federal Regulations, 2014 CFR
2014-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-1 Applicability. (a) The electric installation of each electric power-operated boat winch must meet the requirements in this subpart, except that limit...
46 CFR 111.95-1 - Applicability.
Code of Federal Regulations, 2013 CFR
2013-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-1 Applicability. (a) The electric installation of each electric power-operated boat winch must meet the requirements in this subpart, except that limit...
46 CFR 111.95-1 - Applicability.
Code of Federal Regulations, 2011 CFR
2011-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-1 Applicability. (a) The electric installation of each electric power-operated boat winch must meet the requirements in this subpart, except that limit...
46 CFR 111.95-1 - Applicability.
Code of Federal Regulations, 2010 CFR
2010-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-1 Applicability. (a) The electric installation of each electric power-operated boat winch must meet the requirements in this subpart, except that limit...
7 CFR 1788.12 - Contractors' bonds.
Code of Federal Regulations, 2011 CFR
2011-01-01
... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.12 Contractors' bonds. Electric borrowers shall require contractors to obtain contractors' bonds when required by part 1726...
7 CFR 1788.12 - Contractors' bonds.
Code of Federal Regulations, 2014 CFR
2014-01-01
... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.12 Contractors' bonds. Electric borrowers shall require contractors to obtain contractors' bonds when required by part 1726...
7 CFR 1788.12 - Contractors' bonds.
Code of Federal Regulations, 2012 CFR
2012-01-01
... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.12 Contractors' bonds. Electric borrowers shall require contractors to obtain contractors' bonds when required by part 1726...
7 CFR 1788.12 - Contractors' bonds.
Code of Federal Regulations, 2013 CFR
2013-01-01
... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.12 Contractors' bonds. Electric borrowers shall require contractors to obtain contractors' bonds when required by part 1726...
46 CFR 169.693 - Engine order telegraph systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Engine order telegraph systems. 169.693 Section 169.693... Machinery and Electrical Electrical Installations on Vessels of 100 Gross Tons and Over § 169.693 Engine order telegraph systems. An engine order telegraph system is not required. ...
46 CFR 169.693 - Engine order telegraph systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false Engine order telegraph systems. 169.693 Section 169.693... Machinery and Electrical Electrical Installations on Vessels of 100 Gross Tons and Over § 169.693 Engine order telegraph systems. An engine order telegraph system is not required. ...
46 CFR 169.693 - Engine order telegraph systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 7 2012-10-01 2012-10-01 false Engine order telegraph systems. 169.693 Section 169.693... Machinery and Electrical Electrical Installations on Vessels of 100 Gross Tons and Over § 169.693 Engine order telegraph systems. An engine order telegraph system is not required. ...
46 CFR 169.693 - Engine order telegraph systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 7 2011-10-01 2011-10-01 false Engine order telegraph systems. 169.693 Section 169.693... Machinery and Electrical Electrical Installations on Vessels of 100 Gross Tons and Over § 169.693 Engine order telegraph systems. An engine order telegraph system is not required. ...
46 CFR 169.693 - Engine order telegraph systems.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 7 2014-10-01 2014-10-01 false Engine order telegraph systems. 169.693 Section 169.693... Machinery and Electrical Electrical Installations on Vessels of 100 Gross Tons and Over § 169.693 Engine order telegraph systems. An engine order telegraph system is not required. ...
76 FR 64844 - Airworthiness Directives; General Electric Company Turbofan Engines
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-19
... Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of proposed... General Electric Company (GE) CF6-45 and CF6-50 series turbofan engines with certain low-pressure turbine... series turbofan engines with certain LPT rotor stage 3 disks installed. That AD requires initial and...
7 CFR 1724.30 - Borrowers' requirements-engineering services.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 11 2010-01-01 2010-01-01 false Borrowers' requirements-engineering services. 1724.30... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES Engineering Services § 1724.30 Borrowers' requirements—engineering services. The provisions of...
7 CFR 1724.30 - Borrowers' requirements-engineering services.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 11 2011-01-01 2011-01-01 false Borrowers' requirements-engineering services. 1724.30... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES Engineering Services § 1724.30 Borrowers' requirements—engineering services. The provisions of...
7 CFR 1724.30 - Borrowers' requirements-engineering services.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 11 2012-01-01 2012-01-01 false Borrowers' requirements-engineering services. 1724.30... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES Engineering Services § 1724.30 Borrowers' requirements—engineering services. The provisions of...
7 CFR 1724.30 - Borrowers' requirements-engineering services.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 11 2013-01-01 2013-01-01 false Borrowers' requirements-engineering services. 1724.30... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES Engineering Services § 1724.30 Borrowers' requirements—engineering services. The provisions of...
46 CFR 111.10-4 - Power requirements, generating sources.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 111.10-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Supply § 111.10-4 Power requirements, generating sources. (a) The aggregate capacity of the electric ship's service generating sources required in § 111.10-3 must...
46 CFR 111.10-4 - Power requirements, generating sources.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 111.10-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Supply § 111.10-4 Power requirements, generating sources. (a) The aggregate capacity of the electric ship's service generating sources required in § 111.10-3 must...
46 CFR 111.10-4 - Power requirements, generating sources.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 111.10-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Supply § 111.10-4 Power requirements, generating sources. (a) The aggregate capacity of the electric ship's service generating sources required in § 111.10-3 must...
7 CFR 1724.30 - Borrowers' requirements-engineering services.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 11 2014-01-01 2014-01-01 false Borrowers' requirements-engineering services. 1724.30... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES Engineering Services § 1724.30 Borrowers' requirements—engineering services. Link to an amendment...
46 CFR 111.01-9 - Degrees of protection.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-9 Degrees of protection. (a) Interior electrical equipment exposed... service intended. (b) Electrical equipment in locations requiring exceptional degrees of protection as...
46 CFR 111.01-9 - Degrees of protection.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-9 Degrees of protection. (a) Interior electrical equipment exposed... service intended. (b) Electrical equipment in locations requiring exceptional degrees of protection as...
30 CFR 75.1719-2 - Lighting fixtures; requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... forth in the Institute of Electrical and Electronics Engineers, Inc. Standard No. 32 (IEEE Std. 32-1972... the Institute of Electrical and Electronics Engineers, Inc., Publications Office, 10662 Los Vaqueros...
30 CFR 75.1719-2 - Lighting fixtures; requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... forth in the Institute of Electrical and Electronics Engineers, Inc. Standard No. 32 (IEEE Std. 32-1972... the Institute of Electrical and Electronics Engineers, Inc., Publications Office, 10662 Los Vaqueros...
30 CFR 75.1719-2 - Lighting fixtures; requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... forth in the Institute of Electrical and Electronics Engineers, Inc. Standard No. 32 (IEEE Std. 32-1972... the Institute of Electrical and Electronics Engineers, Inc., Publications Office, 10662 Los Vaqueros...
30 CFR 75.1719-2 - Lighting fixtures; requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... forth in the Institute of Electrical and Electronics Engineers, Inc. Standard No. 32 (IEEE Std. 32-1972... the Institute of Electrical and Electronics Engineers, Inc., Publications Office, 10662 Los Vaqueros...
30 CFR 75.1719-2 - Lighting fixtures; requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... forth in the Institute of Electrical and Electronics Engineers, Inc. Standard No. 32 (IEEE Std. 32-1972... the Institute of Electrical and Electronics Engineers, Inc., Publications Office, 10662 Los Vaqueros...
ESCORT: A Pratt & Whitney nuclear thermal propulsion and power system for manned mars missions
NASA Astrophysics Data System (ADS)
Feller, Gerald J.; Joyner, Russell
1999-01-01
The purpose of this paper is to describe the conceptual design of an upgrade to the Pratt & Whitney ESCORT nuclear thermal rocket engine. The ESCORT is a bimodal engine capable of supporting a wide range of vehicle propulsive and electrical power requirements. The ESCORT engine is powered by a fast-spectrum beryllium-reflected CERMET-fueled nuclear reactor. In propulsive mode, the reactor is used to heat hot hydrogen to approximately 2700 K which is expanded through a converging/diverging nozzle to generate thrust. Heat pickup in the nozzle and the radial beryllium reflectors is used to drive the turbomachinery in the ESCORT expander cycle. In electrical mode, the reactor is used to heat a mixture of helium and xenon to drive a closed-loop Brayton cycle in order to generate electrical energy. This closed loop system has the additional function of a decay heat removal system after the propulsive mode operation is discontinued. The original ESCORT design was capable of delivering 4448.2 N (1000 lbf) of thrust at a vacuum impulse level of approximately 900 s. Design Reference Mission requirements (DRM) from NASA Johnson Space Center and NASA Lewis Research Center studies in 1997 and 1998 have detailed upgraded requirements for potential manned Mars missions. The current NASA DRM requires a nuclear thermal propulsion system capable of delivering total mission requirements of 200170 N (45000 lbf) thrust and 50 kWe of spacecraft electrical power. This is met assuming three engines capable of each delivering 66723 N (15000 lbf) of vacuum thrust and 25 kWe of electrical power. The individual engine requirements were developed assuming three out of three engine reliability for propulsion and two out of three engine reliability for spacecraft electrical power. The approximate target vacuum impulse is 925 s. The Pratt & Whitney ESCORT concept was upgraded to meet these requirements. The hexagonal prismatic fuel elements were modified to address the uprated power requirements while maintaining the peak fuel temperature below the 2880 K limit for W-UO2 CERMET fuels. A system integrated performance methodology was developed to assess the sensitivity to weight, thrust and impulse to the DRM requirements. Propellant tanks, shielding, and Brayton cycle power conversion unit requirements were included in this evaluation.
46 CFR 111.97-1 - Applicability.
Code of Federal Regulations, 2014 CFR
2014-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-1 Applicability. This subpart applies to electric power-operated watertight door systems required under Subpart H of Part 170 of this chapter. [CGD...
46 CFR 111.97-1 - Applicability.
Code of Federal Regulations, 2013 CFR
2013-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-1 Applicability. This subpart applies to electric power-operated watertight door systems required under Subpart H of Part 170 of this chapter. [CGD...
46 CFR 111.97-1 - Applicability.
Code of Federal Regulations, 2011 CFR
2011-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-1 Applicability. This subpart applies to electric power-operated watertight door systems required under Subpart H of Part 170 of this chapter. [CGD...
46 CFR 111.97-1 - Applicability.
Code of Federal Regulations, 2012 CFR
2012-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-1 Applicability. This subpart applies to electric power-operated watertight door systems required under Subpart H of Part 170 of this chapter. [CGD...
46 CFR 111.97-1 - Applicability.
Code of Federal Regulations, 2010 CFR
2010-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-1 Applicability. This subpart applies to electric power-operated watertight door systems required under Subpart H of Part 170 of this chapter. [CGD...
77 FR 58471 - Airworthiness Directives; General Electric Company Turbofan Engines
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-21
... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA.../P1, GEnx-1B75/P1, GEnx- 2B67, and GEnx-2B67B turbofan engines. This AD requires initial and... this AD will affect 11 GE GEnx turbofan engines installed on airplanes of U.S. registry. We also...
Power processing and control requirements of dispersed solar thermal electric generation systems
NASA Technical Reports Server (NTRS)
Das, R. L.
1980-01-01
Power Processing and Control requirements of Dispersed Receiver Solar Thermal Electric Generation Systems are presented. Kinematic Stirling Engines, Brayton Engines and Rankine Engines are considered as prime movers. Various types of generators are considered for ac and dc link generations. It is found that ac-ac Power Conversion is not suitable for implementation at this time. It is also found that ac-dc-ac Power Conversion with a large central inverter is more efficient than ac-dc-ac Power Conversion using small dispersed inverters. Ac-link solar thermal electric plants face potential stability and synchronization problems. Research and development efforts are needed in improving component performance characteristics and generation efficiency to make Solar Thermal Electric Generation economically attractive.
46 CFR 111.97-3 - General requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-3 General requirements. Each watertight door operating system must meet Subpart H, § 170.270 of this chapter. [CGD 74-125A, 47 FR 15236, Apr. 8...
46 CFR 111.97-3 - General requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-3 General requirements. Each watertight door operating system must meet Subpart H, § 170.270 of this chapter. [CGD 74-125A, 47 FR 15236, Apr. 8...
46 CFR 111.97-3 - General requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-3 General requirements. Each watertight door operating system must meet Subpart H, § 170.270 of this chapter. [CGD 74-125A, 47 FR 15236, Apr. 8...
46 CFR 111.97-3 - General requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-3 General requirements. Each watertight door operating system must meet Subpart H, § 170.270 of this chapter. [CGD 74-125A, 47 FR 15236, Apr. 8...
46 CFR 111.97-3 - General requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-3 General requirements. Each watertight door operating system must meet Subpart H, § 170.270 of this chapter. [CGD 74-125A, 47 FR 15236, Apr. 8...
Solar-Powered Electric Propulsion Systems: Engineering and Applications
NASA Technical Reports Server (NTRS)
Stearns, J. W.; Kerrisk, D. J.
1966-01-01
Lightweight, multikilowatt solar power arrays in conjunction with electric propulsion offer potential improvements to space exploration, extending the usefulness of existing launch vehicles to higher-energy missions. Characteristics of solar-powered electric propulsion missions are outlined, and preliminary performance estimates are shown. Spacecraft system engineering is discussed with respect to parametric trade-offs in power and propulsion system design. Relationships between mission performance and propulsion system performance are illustrated. The present state of the art of electric propulsion systems is reviewed and related to the mission requirements identified earlier. The propulsion system design and test requirements for a mission spacecraft are identified and discussed. Although only ion engine systems are currently available, certain plasma propulsion systems offer some advantages in over-all system design. These are identified, and goals are set for plasma-thrustor systems to make them competitive with ion-engine systems for mission applications.
46 CFR 71.65-5 - Plans and specifications required for new construction.
Code of Federal Regulations, 2010 CFR
2010-10-01
... dioxide, foam, and sprinkling systems. (7) Supervised Patrol Route. (e) Marine engineering. (1) For plans required for marine engineering equipment and systems, see subchapter F (Marine Engineering) of this... equipment and systems, see subchapter J (Electrical Engineering) of this chapter. (2) [Reserved] (g...
77 FR 48110 - Airworthiness Directives; General Electric Company Turbofan Engines
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-13
... Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of proposed... certain General Electric Company (GE) CF6-80C2 series turbofan engines. The existing AD requires... 2000-04-14, Amendment 39-11597 (65 FR 10698, February 29, 2000), for all GE CF6-80C2 series turbofan...
7 CFR 1788.47 - Policy requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.47 Policy requirements. (a) Contractors, engineers, and architects performing work for borrowers under construction...
7 CFR 1788.47 - Policy requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.47 Policy requirements. (a) Contractors, engineers, and architects performing work for borrowers under construction...
7 CFR 1788.47 - Policy requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.47 Policy requirements. (a) Contractors, engineers, and architects performing work for borrowers under construction...
7 CFR 1788.47 - Policy requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.47 Policy requirements. (a) Contractors, engineers, and architects performing work for borrowers under construction...
7 CFR 1788.47 - Policy requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.47 Policy requirements. (a) Contractors, engineers, and architects performing work for borrowers under construction...
NASA Technical Reports Server (NTRS)
Johnson, Dexter; Brown, Gerald V.
2005-01-01
Future advanced aircraft fueled by hydrogen are being developed to use electric drive systems instead of gas turbine engines for propulsion. Current conventional electric motor power densities cannot match those of today s gas turbine aircraft engines. However, if significant technological advances could be made in high-power-density motor development, the benefits of an electric propulsion system, such as the reduction of harmful emissions, could be realized.
46 CFR 194.15-19 - Electrical.
Code of Federal Regulations, 2014 CFR
2014-10-01
....15-19 Electrical. (a) All electrical equipment located within 18 inches of the deck of the chemical laboratory shall be in accordance with the applicable requirements of Subchapter J (Electrical Engineering...
46 CFR 194.15-19 - Electrical.
Code of Federal Regulations, 2010 CFR
2010-10-01
....15-19 Electrical. (a) All electrical equipment located within 18 inches of the deck of the chemical laboratory shall be in accordance with the applicable requirements of Subchapter J (Electrical Engineering...
46 CFR 194.15-19 - Electrical.
Code of Federal Regulations, 2011 CFR
2011-10-01
....15-19 Electrical. (a) All electrical equipment located within 18 inches of the deck of the chemical laboratory shall be in accordance with the applicable requirements of Subchapter J (Electrical Engineering...
46 CFR 194.15-19 - Electrical.
Code of Federal Regulations, 2013 CFR
2013-10-01
....15-19 Electrical. (a) All electrical equipment located within 18 inches of the deck of the chemical laboratory shall be in accordance with the applicable requirements of Subchapter J (Electrical Engineering...
46 CFR 194.15-19 - Electrical.
Code of Federal Regulations, 2012 CFR
2012-10-01
....15-19 Electrical. (a) All electrical equipment located within 18 inches of the deck of the chemical laboratory shall be in accordance with the applicable requirements of Subchapter J (Electrical Engineering...
14 CFR 63.37 - Aeronautical experience requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... flight training in the duties of a flight engineer. (3) A degree in aeronautical, electrical, or... (CONTINUED) AIRMEN CERTIFICATION: FLIGHT CREWMEMBERS OTHER THAN PILOTS Flight Engineers § 63.37 Aeronautical...— (1) On which a flight engineer is required by this chapter; or (2) That has at least three engines...
14 CFR 63.37 - Aeronautical experience requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... flight training in the duties of a flight engineer. (3) A degree in aeronautical, electrical, or... (CONTINUED) AIRMEN CERTIFICATION: FLIGHT CREWMEMBERS OTHER THAN PILOTS Flight Engineers § 63.37 Aeronautical...— (1) On which a flight engineer is required by this chapter; or (2) That has at least three engines...
14 CFR 63.37 - Aeronautical experience requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... flight training in the duties of a flight engineer. (3) A degree in aeronautical, electrical, or... (CONTINUED) AIRMEN CERTIFICATION: FLIGHT CREWMEMBERS OTHER THAN PILOTS Flight Engineers § 63.37 Aeronautical...— (1) On which a flight engineer is required by this chapter; or (2) That has at least three engines...
14 CFR 63.37 - Aeronautical experience requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... flight training in the duties of a flight engineer. (3) A degree in aeronautical, electrical, or... (CONTINUED) AIRMEN CERTIFICATION: FLIGHT CREWMEMBERS OTHER THAN PILOTS Flight Engineers § 63.37 Aeronautical...— (1) On which a flight engineer is required by this chapter; or (2) That has at least three engines...
14 CFR 63.37 - Aeronautical experience requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... flight training in the duties of a flight engineer. (3) A degree in aeronautical, electrical, or... (CONTINUED) AIRMEN CERTIFICATION: FLIGHT CREWMEMBERS OTHER THAN PILOTS Flight Engineers § 63.37 Aeronautical...— (1) On which a flight engineer is required by this chapter; or (2) That has at least three engines...
40 CFR 90.114 - Requirement of certification-engine information label.
Code of Federal Regulations, 2010 CFR
2010-07-01
... nomenclature and abbreviations provided in the Society of Automotive Engineers procedure J1930, “Electrical... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Requirement of certification-engine...) AIR PROGRAMS (CONTINUED) CONTROL OF EMISSIONS FROM NONROAD SPARK-IGNITION ENGINES AT OR BELOW 19...
A National Study of Mathematics Requirements for Scientists and Engineers. Final Report.
ERIC Educational Resources Information Center
Miller, G. H.
The National Study of Mathematics Requirements for Scientists and Engineers is concerned with establishing the mathematics experiences desired for the many specializations in science and engineering, such as microbiology, organic chemistry, electrical engineering, and molecular physics. An instruction and course content sheet and a course…
7 CFR 1724.6 - Insurance requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES General § 1724.6 Insurance requirements. (a) Borrowers shall ensure that all architects and engineers working under contract... also ensure that all architects and engineers working under contract with the borrower have insurance...
7 CFR 1724.6 - Insurance requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES General § 1724.6 Insurance requirements. (a) Borrowers shall ensure that all architects and engineers working under contract... also ensure that all architects and engineers working under contract with the borrower have insurance...
7 CFR 1724.6 - Insurance requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES General § 1724.6 Insurance requirements. (a) Borrowers shall ensure that all architects and engineers working under contract... also ensure that all architects and engineers working under contract with the borrower have insurance...
7 CFR 1724.6 - Insurance requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES General § 1724.6 Insurance requirements. (a) Borrowers shall ensure that all architects and engineers working under contract... also ensure that all architects and engineers working under contract with the borrower have insurance...
7 CFR 1724.6 - Insurance requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES General § 1724.6 Insurance requirements. (a) Borrowers shall ensure that all architects and engineers working under contract... also ensure that all architects and engineers working under contract with the borrower have insurance...
Progress toward an optimized hydrogen series hybrid engine
NASA Astrophysics Data System (ADS)
Smith, J. Ray; Aceves, Salvador M.; Johnson, Norman L.; Amsden, Anthony A.
1995-06-01
The design considerations and computational fluid dynamics (CFD) modeling of a high efficiency, low emissions, hydrogen-fueled engine for use as the prime mover of a series hybrid automobile is described. The series hybrid automobile uses the engine to generate electrical energy via a lightweight generator, the electrical energy is stored in a power peaking device (like a flywheel or ultracapacitor) and used as required to meet the tractive drive requirements (plus accessory loads) through an electrical motor. The engine/generator is stopped whenever the energy storage device is fully charged. Engine power output required was determined with a vehicle simulation code to be 15 to 20 kW steady state with peak output of 40 to 45 kW for hill climb. Combustion chamber and engine geometry were determined from a critical review of the hydrogen engine experiments in the literature combined with a simplified global engine model. Two different engine models are employed to guide engine design. The models are a simplified global engine performance model that relies strongly on correlations with literature data for heat transfer and friction losses, and a state-of-the-art CFD combustion model, KIVA-3, to elucidate fluid mechanics and combustion details through full three-dimensional modeling. Both intake and exhaust processes as well as hydrogen combustion chemistry and thermal NO(sub x) production are simulated. Ultimately, a comparison between the simulation and experimental results will lead to improved modeling and will give guidance to changes required in the next generation engine to achieve the goal of 45% brake thermal efficiency.
46 CFR 111.25-1 - General requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false General requirements. 111.25-1 Section 111.25-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Motors § 111.25-1 General requirements. The requirements for generators contained in § 111.12-5...
46 CFR 111.25-1 - General requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false General requirements. 111.25-1 Section 111.25-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Motors § 111.25-1 General requirements. The requirements for generators contained in § 111.12-5...
46 CFR 111.25-1 - General requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false General requirements. 111.25-1 Section 111.25-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Motors § 111.25-1 General requirements. The requirements for generators contained in § 111.12-5...
46 CFR 111.25-1 - General requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false General requirements. 111.25-1 Section 111.25-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Motors § 111.25-1 General requirements. The requirements for generators contained in § 111.12-5...
46 CFR 111.25-1 - General requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false General requirements. 111.25-1 Section 111.25-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Motors § 111.25-1 General requirements. The requirements for generators contained in § 111.12-5...
Heat engine generator control system
Rajashekara, K.; Gorti, B.V.; McMullen, S.R.; Raibert, R.J.
1998-05-12
An electrical power generation system includes a heat engine having an output member operatively coupled to the rotor of a dynamoelectric machine. System output power is controlled by varying an electrical parameter of the dynamoelectric machine. A power request signal is related to an engine speed and the electrical parameter is varied in accordance with a speed control loop. Initially, the sense of change in the electrical parameter in response to a change in the power request signal is opposite that required to effectuate a steady state output power consistent with the power request signal. Thereafter, the electrical parameter is varied to converge the output member speed to the speed known to be associated with the desired electrical output power. 8 figs.
Heat engine generator control system
Rajashekara, Kaushik; Gorti, Bhanuprasad Venkata; McMullen, Steven Robert; Raibert, Robert Joseph
1998-01-01
An electrical power generation system includes a heat engine having an output member operatively coupled to the rotor of a dynamoelectric machine. System output power is controlled by varying an electrical parameter of the dynamoelectric machine. A power request signal is related to an engine speed and the electrical parameter is varied in accordance with a speed control loop. Initially, the sense of change in the electrical parameter in response to a change in the power request signal is opposite that required to effectuate a steady state output power consistent with the power request signal. Thereafter, the electrical parameter is varied to converge the output member speed to the speed known to be associated with the desired electrical output power.
NASA Astrophysics Data System (ADS)
Joyner, Claude Russell; Fowler, Bruce; Matthews, John
2003-01-01
In space, whether in a stable satellite orbit around a planetary body or traveling as a deep space exploration craft, power is just as important as the propulsion. The need for power is especially important for in-space vehicles that use Electric Propulsion. Using nuclear power with electric propulsion has the potential to provide increased payload fractions and reduced mission times to the outer planets. One of the critical engineering and design aspects of nuclear electric propulsion at required mission optimized power levels is the mechanism that is used to convert the thermal energy of the reactor to electrical power. The use of closed Brayton cycles has been studied over the past 30 or years and shown to be the optimum approach for power requirements that range from ten to hundreds of kilowatts of power. It also has been found to be scalable to higher power levels. The Closed Brayton Cycle (CBC) engine power conversion unit (PCU) is the most flexible for a wide range of power conversion needs and uses state-of-the-art, demonstrated engineering approaches. It also is in use with many commercial power plants today. The long life requirements and need for uninterrupted operation for nuclear electric propulsion demands high reliability from a CBC engine. A CBC engine design for use with a Nuclear Electric Propulsion (NEP) system has been defined based on Pratt & Whitney's data from designing long-life turbo-machines such as the Space Shuttle turbopumps and military gas turbines and the use of proven integrated control/health management systems (EHMS). An integrated CBC and EHMS design that is focused on using low-risk and proven technologies will over come many of the life-related design issues. This paper will discuss the use of a CBC engine as the power conversion unit coupled to a gas-cooled nuclear reactor and the design trends relative to its use for powering electric thrusters in the 25 kWe to 100kWe power level.
Engine-start Control Strategy of P2 Parallel Hybrid Electric Vehicle
NASA Astrophysics Data System (ADS)
Xiangyang, Xu; Siqi, Zhao; Peng, Dong
2017-12-01
A smooth and fast engine-start process is important to parallel hybrid electric vehicles with an electric motor mounted in front of the transmission. However, there are some challenges during the engine-start control. Firstly, the electric motor must simultaneously provide a stable driving torque to ensure the drivability and a compensative torque to drag the engine before ignition. Secondly, engine-start time is a trade-off control objective because both fast start and smooth start have to be considered. To solve these problems, this paper first analyzed the resistance of the engine start process, and established a physic model in MATLAB/Simulink. Then a model-based coordinated control strategy among engine, motor and clutch was developed. Two basic control strategy during fast start and smooth start process were studied. Simulation results showed that the control objectives were realized by applying given control strategies, which can meet different requirement from the driver.
Design of Electronic Experiments Using Computer Generated Virtual Instruments
1994-03-01
work associated with the classical electronics laboratory experiments required in a tpical Electrical Engineering program. This thesis reports the...requiremnents for the degree of MASTER OF SCIENCE IN ELECITRICAL ENGINEERING from the NAVAL POSTGRADUATE SCHOOL March 1994 Aufhfi_...Thcdore Joseph SerbinskI Approved by: Sherif Michael, Thesis Advisor Department of Electrical and Comte Engineering ii ABSIRACT The recent availability
Code of Federal Regulations, 2010 CFR
2010-07-01
... Electrical Accident Occupation Blue collar supervisors. 1 Electrical and electronic engineers. 1 Electrical... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Electrical Safety-Related Work Practices § 1910.332 Training. (a... electric shock that is not reduced to a safe level by the electrical installation requirements of §§ 1910...
Code of Federal Regulations, 2011 CFR
2011-07-01
... Electrical Accident Occupation Blue collar supervisors. 1 Electrical and electronic engineers. 1 Electrical... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Electrical Safety-Related Work Practices § 1910.332 Training. (a... electric shock that is not reduced to a safe level by the electrical installation requirements of §§ 1910...
Code of Federal Regulations, 2013 CFR
2013-07-01
... Electrical Accident Occupation Blue collar supervisors. 1 Electrical and electronic engineers. 1 Electrical... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Electrical Safety-Related Work Practices § 1910.332 Training. (a... electric shock that is not reduced to a safe level by the electrical installation requirements of §§ 1910...
Code of Federal Regulations, 2012 CFR
2012-07-01
... Electrical Accident Occupation Blue collar supervisors. 1 Electrical and electronic engineers. 1 Electrical... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Electrical Safety-Related Work Practices § 1910.332 Training. (a... electric shock that is not reduced to a safe level by the electrical installation requirements of §§ 1910...
Code of Federal Regulations, 2014 CFR
2014-07-01
... Electrical Accident Occupation Blue collar supervisors. 1 Electrical and electronic engineers. 1 Electrical... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Electrical Safety-Related Work Practices § 1910.332 Training. (a... electric shock that is not reduced to a safe level by the electrical installation requirements of §§ 1910...
46 CFR 111.105-39 - Additional requirements for vessels carrying vehicles with fuel in their tanks.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Additional requirements for vessels carrying vehicles... SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-39 Additional requirements for vessels carrying vehicles with fuel in their tanks. Each vessel...
46 CFR 111.105-39 - Additional requirements for vessels carrying vehicles with fuel in their tanks.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Additional requirements for vessels carrying vehicles... SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-39 Additional requirements for vessels carrying vehicles with fuel in their tanks. Each vessel...
46 CFR 189.55-5 - Plans and specifications required for new construction.
Code of Federal Regulations, 2011 CFR
2011-10-01
...) OCEANOGRAPHIC RESEARCH VESSELS INSPECTION AND CERTIFICATION Plan Approval § 189.55-5 Plans and specifications..., carbon dioxide, foam and sprinkling systems. (e) Marine engineering. For plans required for marine engineering equipment and systems. See Subchapter F (Marine Engineering) of this chapter. (f) Electrical...
46 CFR 189.55-5 - Plans and specifications required for new construction.
Code of Federal Regulations, 2010 CFR
2010-10-01
...) OCEANOGRAPHIC RESEARCH VESSELS INSPECTION AND CERTIFICATION Plan Approval § 189.55-5 Plans and specifications..., carbon dioxide, foam and sprinkling systems. (e) Marine engineering. For plans required for marine engineering equipment and systems. See Subchapter F (Marine Engineering) of this chapter. (f) Electrical...
Preliminary designs for 25 kWe advanced Stirling conversion systems for dish electric applications
NASA Technical Reports Server (NTRS)
Shaltens, Richard K.; Schreiber, Jeffrey G.
1990-01-01
Under the Department of Energy's (DOE) Solar Thermal Technology Program, Sandia National Laboratories is evaluating heat engines for terrestrial Solar Distributed Heat Receivers. The Stirling engine has been identified by Sandia as one of the most promising engines for terrestrial applications. The Stirling engine also has the potential to meet DOE's performance and cost goals. The NASA Lewis Research Center is conducting Stirling engine technology development activities directed toward a dynamic power source for space applications. Space power systems requirements include high reliability, very long life, low vibration and high efficiency. The free-piston Stirling engine has the potential for future high power space conversion systems, either nuclear or solar powered. Although both applications appear to be quite different, their requirements complement each other. Preliminary designs feature a free-piston Stirling engine, a liquid metal heat transport system, and a means to provide nominally 25 kW electric power to a utility grid while meeting DOE's performance and long term cost goals. The Cummins design incorporates a linear alternator to provide the electrical output, while the STC design generates electrical power indirectly through a hydraulic pump/motor coupled to an induction generator. Both designs for the ASCS's will use technology which can reasonably be expected to be available in the early 1990's.
Preliminary designs for 25 kWe advanced Stirling conversion systems for dish electric applications
NASA Astrophysics Data System (ADS)
Shaltens, Richard K.; Schreiber, Jeffrey G.
Under the Department of Energy's (DOE) Solar Thermal Technology Program, Sandia National Laboratories is evaluating heat engines for terrestrial Solar Distributed Heat Receivers. The Stirling engine has been identified by Sandia as one of the most promising engines for terrestrial applications. The Stirling engine also has the potential to meet DOE's performance and cost goals. The NASA Lewis Research Center is conducting Stirling engine technology development activities directed toward a dynamic power source for space applications. Space power systems requirements include high reliability, very long life, low vibration and high efficiency. The free-piston Stirling engine has the potential for future high power space conversion systems, either nuclear or solar powered. Although both applications appear to be quite different, their requirements complement each other. Preliminary designs feature a free-piston Stirling engine, a liquid metal heat transport system, and a means to provide nominally 25 kW electric power to a utility grid while meeting DOE's performance and long term cost goals. The Cummins design incorporates a linear alternator to provide the electrical output, while the STC design generates electrical power indirectly through a hydraulic pump/motor coupled to an induction generator. Both designs for the ASCS's will use technology which can reasonably be expected to be available in the early 1990's.
Preliminary designs for 25 kWe advanced Stirling conversion systems for dish electric applications
NASA Technical Reports Server (NTRS)
Shaltens, Richard K.; Schreiber, Jeffrey G.
1990-01-01
Under the Department of Energy's (DOE) Solar Thermal Technology Program, Sandia National Laboratories is evaluating heat engines for terrestrial Solar Distributed Heat Receivers. The Stirling engine has been identified by Sandia as one of the most promising engines for terrestrial applications. The Stirling engine also has the potential to meet DOE's performance and cost goals. The NASA Lewis Research Center is conducting Stirling engine technology development activities directed toward a dynamic power source for space applications. Space power systems requirements include high reliability, very long life, low vibration and high efficiency. The free-piston Stirling engine has the potential for future high power space conversion systems, either nuclear or solar powered. Although both applications appear to be quite different, their requirements complement each other. Preliminary designs feature a free-piston Stirling engine, a liquid metal heat transport system, and a means to provide nominally 25 kW electric power to a utility grid while meeting DOE's performance and long term cost goals. The Cummins design incorporates a linear alternator to provide the electrical output, while the STC design generates electrical power indirectly through a hydraulic pump/motor coupled to an induction generator. Both designs for the ASCS's will use technology which can reasonably be expected to be available in the early 1990's
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-23
... engine and engine parts manufacturing,'' ``Motor vehicle electrical and electronic equipment... manufacturing,'' ``Other motor vehicle electrical and electronic equipment manufacturing,'' and ``All other motor vehicle parts manufacturing'' in the second column from the list of required NAICS codes for the...
Code of Federal Regulations, 2010 CFR
2010-01-01
... (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.46 General. This subpart sets forth RUS policies for minimum insurance requirements for contractors, engineers, and...
Code of Federal Regulations, 2014 CFR
2014-01-01
... (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.46 General. This subpart sets forth RUS policies for minimum insurance requirements for contractors, engineers, and...
Code of Federal Regulations, 2011 CFR
2011-01-01
... (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.46 General. This subpart sets forth RUS policies for minimum insurance requirements for contractors, engineers, and...
Code of Federal Regulations, 2012 CFR
2012-01-01
... (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.46 General. This subpart sets forth RUS policies for minimum insurance requirements for contractors, engineers, and...
Code of Federal Regulations, 2013 CFR
2013-01-01
... (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.46 General. This subpart sets forth RUS policies for minimum insurance requirements for contractors, engineers, and...
2009-12-01
vehicles so do some electric vehicle braking systems (MIT, 2008). e. Brakes Regenerative braking on electric vehicles recoups some of the energy lost...engine is required to replace the energy lost by braking . Regenerative braking takes some of the lost energy during braking and turns it into...Motors and Tesla Motors offer regenerative breaking in their respective electric vehicles. Tesla explains regenerative braking as “engine braking
Systems Engineering of Electric and Hybrid Vehicles
NASA Technical Reports Server (NTRS)
Kurtz, D. W.; Levin, R. R.
1986-01-01
Technical paper notes systems engineering principles applied to development of electric and hybrid vehicles such that system performance requirements support overall program goal of reduced petroleum consumption. Paper discusses iterative design approach dictated by systems analyses. In addition to obvious peformance parameters of range, acceleration rate, and energy consumption, systems engineering also considers such major factors as cost, safety, reliability, comfort, necessary supporting infrastructure, and availability of materials.
46 CFR 111.85-1 - Electric oil immersion heaters.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Electric oil immersion heaters. 111.85-1 Section 111.85-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Oil Immersion Heaters § 111.85-1 Electric oil immersion heaters...
46 CFR 111.85-1 - Electric oil immersion heaters.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Electric oil immersion heaters. 111.85-1 Section 111.85-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Oil Immersion Heaters § 111.85-1 Electric oil immersion heaters...
46 CFR 111.85-1 - Electric oil immersion heaters.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Electric oil immersion heaters. 111.85-1 Section 111.85-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Oil Immersion Heaters § 111.85-1 Electric oil immersion heaters...
46 CFR 111.85-1 - Electric oil immersion heaters.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Electric oil immersion heaters. 111.85-1 Section 111.85-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Oil Immersion Heaters § 111.85-1 Electric oil immersion heaters...
46 CFR 111.85-1 - Electric oil immersion heaters.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Electric oil immersion heaters. 111.85-1 Section 111.85-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Oil Immersion Heaters § 111.85-1 Electric oil immersion heaters...
Development of a Dedicated Speech Work Station.
1984-12-01
AD-Ai55 465 DEVELOPMENT OF R DEDICATED SPEECH WORK STTION(U) AIR / FORCE INST OF TECH WRIGHT-PATTERSON AFB OH SCHOOL OF ENGINEERING W H LIEBER DEC 84...Presented to the Faculty of the School of Engineering of the Air Force Institute of Technology Air University in Partial Fulfillment of the Requirement for...the Degree of Master of Science in Electrical Engineering by William H. Lieber, B.S.E.E. Capt USAF Graduate Electrical Engineering December 1984
7 CFR 1788.54 - Compliance with contracts.
Code of Federal Regulations, 2011 CFR
2011-01-01
... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.54 Compliance with... engineer, architect, and the contractor have insurance that complies with their contract requirements. ...
7 CFR 1788.54 - Compliance with contracts.
Code of Federal Regulations, 2014 CFR
2014-01-01
... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.54 Compliance with... engineer, architect, and the contractor have insurance that complies with their contract requirements. ...
7 CFR 1788.48 - Contract insurance requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
..., DEPARTMENT OF AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers..., engineers, and architects shall provide that they take out and maintain throughout the contract period...
7 CFR 1788.48 - Contract insurance requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
..., DEPARTMENT OF AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers..., engineers, and architects shall provide that they take out and maintain throughout the contract period...
7 CFR 1788.54 - Compliance with contracts.
Code of Federal Regulations, 2012 CFR
2012-01-01
... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.54 Compliance with... engineer, architect, and the contractor have insurance that complies with their contract requirements. ...
7 CFR 1788.48 - Contract insurance requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
..., DEPARTMENT OF AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers..., engineers, and architects shall provide that they take out and maintain throughout the contract period...
7 CFR 1788.54 - Compliance with contracts.
Code of Federal Regulations, 2013 CFR
2013-01-01
... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.54 Compliance with... engineer, architect, and the contractor have insurance that complies with their contract requirements. ...
7 CFR 1788.54 - Compliance with contracts.
Code of Federal Regulations, 2010 CFR
2010-01-01
... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.54 Compliance with... engineer, architect, and the contractor have insurance that complies with their contract requirements. ...
7 CFR 1788.48 - Contract insurance requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
..., DEPARTMENT OF AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers..., engineers, and architects shall provide that they take out and maintain throughout the contract period...
7 CFR 1788.48 - Contract insurance requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
..., DEPARTMENT OF AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers..., engineers, and architects shall provide that they take out and maintain throughout the contract period...
Energy Conversion and Storage Requirements for Hybrid Electric Aircraft
NASA Technical Reports Server (NTRS)
Misra, Ajay
2016-01-01
Among various options for reducing greenhouse gases in future large commercial aircraft, hybrid electric option holds significant promise. In the hybrid electric aircraft concept, gas turbine engine is used in combination with an energy storage system to drive the fan that propels the aircraft, with gas turbine engine being used for certain segments of the flight cycle and energy storage system being used for other segments. The paper will provide an overview of various energy conversion and storage options for hybrid electric aircraft. Such options may include fuel cells, batteries, super capacitors, multifunctional structures with energy storage capability, thermoelectric, thermionic or a combination of any of these options. The energy conversion and storage requirements for hybrid electric aircraft will be presented. The role of materials in energy conversion and storage systems for hybrid electric aircraft will be discussed.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-1 General. (a) Electric installations on vessels must ensure: (1) Maintenance of services... persons, and the vessel from electrical hazards. (3) Maintenance of system integrity through compliance...
Code of Federal Regulations, 2014 CFR
2014-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-1 General. (a) Electric installations on vessels must ensure: (1) Maintenance of services... persons, and the vessel from electrical hazards. (3) Maintenance of system integrity through compliance...
Code of Federal Regulations, 2010 CFR
2010-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-1 General. (a) Electric installations on vessels must ensure: (1) Maintenance of services... persons, and the vessel from electrical hazards. (3) Maintenance of system integrity through compliance...
46 CFR 111.106-17 - Piping: electrical bonding.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Piping: electrical bonding. 111.106-17 Section 111.106-17 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations on OSVs § 111.106-17 Piping: electrical bonding. (a...
7 CFR 1788.55 - Providing RUS evidence.
Code of Federal Regulations, 2011 CFR
2011-01-01
... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.55 Providing RUS evidence. When RUS shall specifically so direct, the borrower shall also require the engineer, the...
7 CFR 1788.55 - Providing RUS evidence.
Code of Federal Regulations, 2014 CFR
2014-01-01
... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.55 Providing RUS evidence. When RUS shall specifically so direct, the borrower shall also require the engineer, the...
7 CFR 1788.55 - Providing RUS evidence.
Code of Federal Regulations, 2012 CFR
2012-01-01
... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.55 Providing RUS evidence. When RUS shall specifically so direct, the borrower shall also require the engineer, the...
7 CFR 1788.55 - Providing RUS evidence.
Code of Federal Regulations, 2010 CFR
2010-01-01
... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.55 Providing RUS evidence. When RUS shall specifically so direct, the borrower shall also require the engineer, the...
7 CFR 1788.55 - Providing RUS evidence.
Code of Federal Regulations, 2013 CFR
2013-01-01
... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.55 Providing RUS evidence. When RUS shall specifically so direct, the borrower shall also require the engineer, the...
46 CFR 111.50-2 - Systems integration.
Code of Federal Regulations, 2012 CFR
2012-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-2 Systems integration. The electrical characteristics of each... the design of the entire protective system. Note to § 111.50-2: The electrical characteristics of...
46 CFR 111.50-2 - Systems integration.
Code of Federal Regulations, 2014 CFR
2014-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-2 Systems integration. The electrical characteristics of each... the design of the entire protective system. Note to § 111.50-2: The electrical characteristics of...
46 CFR 111.50-2 - Systems integration.
Code of Federal Regulations, 2013 CFR
2013-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-2 Systems integration. The electrical characteristics of each... the design of the entire protective system. Note to § 111.50-2: The electrical characteristics of...
46 CFR 111.50-2 - Systems integration.
Code of Federal Regulations, 2011 CFR
2011-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-2 Systems integration. The electrical characteristics of each... the design of the entire protective system. Note to § 111.50-2: The electrical characteristics of...
Electrical Bonding: A Survey of Requirement, Methods, and Specifications
NASA Technical Reports Server (NTRS)
Evans, R. W.
1998-01-01
This document provides information helpful to engineers imposing electrical bonding requirements, reviewing waiver requests, or modifying specifications on various space programs. Electrical bonding specifications and some of the processes used in the United States have been reviewed. This document discusses the specifications, the types of bonds, the intent of each, and the basic requirements where possible. Additional topics discussed are resistance versus impedance, bond straps, corrosion, finishes, and special applications.
Motor-Reducer Sizing through a MATLAB-Based Graphical Technique
ERIC Educational Resources Information Center
Giberti, H.; Cinquemani, S.
2012-01-01
The design of the drive system for an automatic machine and its correct sizing is a very important competence for an electrical or mechatronic engineer. This requires knowledge that crosses the fields of electrical engineering, electronics and mechanics, as well as the skill to choose commercial components based upon their technical documentation.…
7 CFR 1730.26 - Certification.
Code of Federal Regulations, 2010 CFR
2010-01-01
... ELECTRIC SYSTEM OPERATIONS AND MAINTENANCE Operations and Maintenance Requirements § 1730.26 Certification. (a) Engineer's certification. Where provided for in the borrower's loan documents, RUS may require the borrower to provide an “Engineer's Certification” as to the condition of the borrower's system...
7 CFR 1730.26 - Certification.
Code of Federal Regulations, 2011 CFR
2011-01-01
... ELECTRIC SYSTEM OPERATIONS AND MAINTENANCE Operations and Maintenance Requirements § 1730.26 Certification. (a) Engineer's certification. Where provided for in the borrower's loan documents, RUS may require the borrower to provide an “Engineer's Certification” as to the condition of the borrower's system...
7 CFR 1730.26 - Certification.
Code of Federal Regulations, 2012 CFR
2012-01-01
... ELECTRIC SYSTEM OPERATIONS AND MAINTENANCE Operations and Maintenance Requirements § 1730.26 Certification. (a) Engineer's certification. Where provided for in the borrower's loan documents, RUS may require the borrower to provide an “Engineer's Certification” as to the condition of the borrower's system...
7 CFR 1730.26 - Certification.
Code of Federal Regulations, 2014 CFR
2014-01-01
... ELECTRIC SYSTEM OPERATIONS AND MAINTENANCE Operations and Maintenance Requirements § 1730.26 Certification. (a) Engineer's certification. Where provided for in the borrower's loan documents, RUS may require the borrower to provide an “Engineer's Certification” as to the condition of the borrower's system...
7 CFR 1730.26 - Certification.
Code of Federal Regulations, 2013 CFR
2013-01-01
... ELECTRIC SYSTEM OPERATIONS AND MAINTENANCE Operations and Maintenance Requirements § 1730.26 Certification. (a) Engineer's certification. Where provided for in the borrower's loan documents, RUS may require the borrower to provide an “Engineer's Certification” as to the condition of the borrower's system...
7 CFR 1788.12 - Contractors' bonds.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 12 2010-01-01 2010-01-01 false Contractors' bonds. 1788.12 Section 1788.12... Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.12 Contractors' bonds. Electric borrowers shall require contractors to obtain contractors' bonds when required by part 1726...
46 CFR 111.01-19 - Inclination of the vessel.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-19 Inclination of the vessel. (a) All electrical equipment must be.... Additionally, electrical equipment necessary for the maneuvering, navigation, and safety of the vessel or its...
46 CFR 111.87-1 - Applicability.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Applicability. 111.87-1 Section 111.87-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Air Heating Equipment § 111.87-1 Applicability. This subpart applies to electrically...
46 CFR 111.87-1 - Applicability.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Applicability. 111.87-1 Section 111.87-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Air Heating Equipment § 111.87-1 Applicability. This subpart applies to electrically...
46 CFR 111.87-1 - Applicability.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Applicability. 111.87-1 Section 111.87-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Air Heating Equipment § 111.87-1 Applicability. This subpart applies to electrically...
46 CFR 111.87-1 - Applicability.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Applicability. 111.87-1 Section 111.87-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Air Heating Equipment § 111.87-1 Applicability. This subpart applies to electrically...
46 CFR 111.87-1 - Applicability.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Applicability. 111.87-1 Section 111.87-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Air Heating Equipment § 111.87-1 Applicability. This subpart applies to electrically...
46 CFR 111.01-19 - Inclination of the vessel.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-19 Inclination of the vessel. (a) All electrical equipment must be.... Additionally, electrical equipment necessary for the maneuvering, navigation, and safety of the vessel or its...
46 CFR 111.01-19 - Inclination of the vessel.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-19 Inclination of the vessel. (a) All electrical equipment must be.... Additionally, electrical equipment necessary for the maneuvering, navigation, and safety of the vessel or its...
46 CFR 111.01-19 - Inclination of the vessel.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-19 Inclination of the vessel. (a) All electrical equipment must be.... Additionally, electrical equipment necessary for the maneuvering, navigation, and safety of the vessel or its...
33 CFR 145.10 - Locations and number of fire extinguishers required.
Code of Federal Regulations, 2011 CFR
2011-07-01
... vicinity of exits, either inside or outside of spaces. machinery spaces Gas-fired boilers B-II (CO2 or dry chemical) 2 required. Gas-fired boilers B-V 1 required. 1 Oil-fired boilers B-II 2 required. Oil-fired boilers B-V 2 required. 1 Internal combustion or gas turbine engines B-II 1 for each engine. 2 Electric...
33 CFR 145.10 - Locations and number of fire extinguishers required.
Code of Federal Regulations, 2012 CFR
2012-07-01
... vicinity of exits, either inside or outside of spaces. machinery spaces Gas-fired boilers B-II (CO2 or dry chemical) 2 required. Gas-fired boilers B-V 1 required. 1 Oil-fired boilers B-II 2 required. Oil-fired boilers B-V 2 required. 1 Internal combustion or gas turbine engines B-II 1 for each engine. 2 Electric...
33 CFR 145.10 - Locations and number of fire extinguishers required.
Code of Federal Regulations, 2013 CFR
2013-07-01
... vicinity of exits, either inside or outside of spaces. machinery spaces Gas-fired boilers B-II (CO2 or dry chemical) 2 required. Gas-fired boilers B-V 1 required. 1 Oil-fired boilers B-II 2 required. Oil-fired boilers B-V 2 required. 1 Internal combustion or gas turbine engines B-II 1 for each engine. 2 Electric...
33 CFR 145.10 - Locations and number of fire extinguishers required.
Code of Federal Regulations, 2014 CFR
2014-07-01
... vicinity of exits, either inside or outside of spaces. machinery spaces Gas-fired boilers B-II (CO2 or dry chemical) 2 required. Gas-fired boilers B-V 1 required. 1 Oil-fired boilers B-II 2 required. Oil-fired boilers B-V 2 required. 1 Internal combustion or gas turbine engines B-II 1 for each engine. 2 Electric...
33 CFR 145.10 - Locations and number of fire extinguishers required.
Code of Federal Regulations, 2010 CFR
2010-07-01
... vicinity of exits, either inside or outside of spaces. machinery spaces Gas-fired boilers B-II (CO2 or dry chemical) 2 required. Gas-fired boilers B-V 1 required. 1 Oil-fired boilers B-II 2 required. Oil-fired boilers B-V 2 required. 1 Internal combustion or gas turbine engines B-II 1 for each engine. 2 Electric...
Code of Federal Regulations, 2010 CFR
2010-10-01
... transported under deck, provided the following requirements are met: (1) The cargo space shall be provided... in accordance with the requirements under which they were manufactured. (7) Electrical circuits in the cargo spaces must meet the hazardous area requirements in subchapter J (Electrical Engineering...
Analysis of Defenses Against Code Reuse Attacks on Modern and New Architectures
2015-09-01
soundness or completeness. An incomplete analysis will produce extra edges in the CFG that might allow an attacker to slip through. An unsound analysis...Analysis of Defenses Against Code Reuse Attacks on Modern and New Architectures by Isaac Noah Evans Submitted to the Department of Electrical...Engineering and Computer Science in partial fulfillment of the requirements for the degree of Master of Engineering in Electrical Engineering and Computer
INNOVATIVE HYBRID GAS/ELECTRIC CHILLER COGENERATION
DOE Office of Scientific and Technical Information (OSTI.GOV)
Todd Kollross; Mike Connolly
2004-06-30
Engine-driven chillers are quickly gaining popularity in the market place (increased from 7,000 tons in 1994 to greater than 50,000 tons in 1998) due to their high efficiency, electric peak shaving capability, and overall low operating cost. The product offers attractive economics (5 year pay back or less) in many applications, based on areas cooling requirements and electric pricing structure. When heat is recovered and utilized from the engine, the energy resource efficiency of a natural gas engine-driven chiller is higher than all competing products. As deregulation proceeds, real time pricing rate structures promise high peak demand electric rates, butmore » low off-peak electric rates. An emerging trend with commercial building owners and managers who require air conditioning today is to reduce their operating costs by installing hybrid chiller systems that combine gas and electric units. Hybrid systems not only reduce peak electric demand charges, but also allow customers to level their energy load profiles and select the most economical energy source, gas or electricity, from hour to hour. Until recently, however, all hybrid systems incorporated one or more gas-powered chillers (engine driven and/or absorption) and one or more conventional electric units. Typically, the cooling capacity of hybrid chiller plants ranges from the hundreds to thousands of refrigeration tons, with multiple chillers affording the user a choice of cooling systems. But this flexibility is less of an option for building operators who have limited room for equipment. To address this technology gap, a hybrid chiller was developed by Alturdyne that combines a gas engine, an electric motor and a refrigeration compressor within a single package. However, this product had not been designed to realize the full features and benefits possible by combining an engine, motor/generator and compressor. The purpose of this project is to develop a new hybrid chiller that can (1) reduce end-user energy costs, (2) lower building peak electric load, (3) increase energy efficiency, and (4) provide standby power. This new hybrid product is designed to allow the engine to generate electricity or drive the chiller's compressor, based on the market price and conditions of the available energy sources. Building owners can minimize cooling costs by operating with natural gas or electricity, depending on time of day energy rates. In the event of a backout, the building owner could either operate the product as a synchronous generator set, thus providing standby power, or continue to operate a chiller to provide air conditioning with support of a small generator set to cover the chiller's electric auxiliary requirements. The ability to utilize the same piece of equipment as a hybrid gas/electric chiller or a standby generator greatly enhances its economic attractiveness and would substantially expand the opportunities for high efficiency cooling products.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-14
... vehicles when 4.1% of the fleet is HV and EV would be 2790 fewer pedestrian and pedalcyclist injuries. We... Engine Vehicles to Hybrid and Electric Vehicles B. Need for Independent Mobility of People Who Are... requirements for hybrid and electric vehicles when operating under 30 kilometers per hour (km/h) (18 mph), when...
46 CFR 111.105-39 - Additional requirements for vessels carrying vehicles with fuel in their tanks.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Additional requirements for vessels carrying vehicles with fuel in their tanks. 111.105-39 Section 111.105-39 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-39 Additional requirements for vessels...
46 CFR 111.105-39 - Additional requirements for vessels carrying vehicles with fuel in their tanks.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Additional requirements for vessels carrying vehicles with fuel in their tanks. 111.105-39 Section 111.105-39 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-39 Additional requirements for vessels...
Engineering support activities for the Apollo 17 Surface Electrical Properties Experiment.
NASA Technical Reports Server (NTRS)
Cubley, H. D.
1972-01-01
Description of the engineering support activities which were required to ensure fulfillment of objectives specified for the Apollo 17 SEP (Surface Electrical Properties) Experiment. Attention is given to procedural steps involving verification of hardware acceptability to the astronauts, computer simulation of the experiment hardware, field trials, receiver antenna pattern measurements, and the qualification test program.
49 CFR 579.21 - Reporting requirements for manufacturers of 5,000 or more light vehicles annually.
Code of Federal Regulations, 2013 CFR
2013-10-01
..., 05 parking brake, 06 engine and engine cooling system, 07 fuel system, 10 power train, 11 electrical... model, the model year, the type, the platform, the fuel and/or propulsion system type coded as follows: CNG (compressed natural gas), CIF (compression ignition fuel), EBP (electric battery power), FCP (fuel...
Heat engine development for solar thermal power systems
NASA Astrophysics Data System (ADS)
Pham, H. Q.; Jaffe, L. D.
The parabolic dish solar collector systems for converting sunlight to electrical power through a heat engine will, require a small heat engine of high performance long lifetime to be competitive with conventional power systems. The most promising engine candidates are Stirling, high temperature Brayton, and combined cycle. Engines available in the current market today do not meet these requirements. The development of Stirling and high temperature Brayton for automotive applications was studied which utilizes much of the technology developed in this automotive program for solar power engines. The technical status of the engine candidates is reviewed and the components that may additional development to meet solar thermal system requirements are identified.
Nuclear electric propulsion mission engineering study. Volume 2: Final report
NASA Technical Reports Server (NTRS)
1973-01-01
Results of a mission engineering analysis of nuclear-thermionic electric propulsion spacecraft for unmanned interplanetary and geocentric missions are summarized. Critical technologies associated with the development of nuclear electric propulsion (NEP) are assessed, along with the impact of its availability on future space programs. Outer planet and comet rendezvous mission analysis, NEP stage design for geocentric and interplanetary missions, NEP system development cost and unit costs, and technology requirements for NEP stage development are studied.
46 CFR 111.95-7 - Wiring of boat winch components.
Code of Federal Regulations, 2012 CFR
2012-10-01
...-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-7 Wiring of boat winch... electric installation from all sources of potential. The switch must be in series with and on the supply...
46 CFR 111.95-7 - Wiring of boat winch components.
Code of Federal Regulations, 2013 CFR
2013-10-01
...-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-7 Wiring of boat winch... electric installation from all sources of potential. The switch must be in series with and on the supply...
46 CFR 111.95-7 - Wiring of boat winch components.
Code of Federal Regulations, 2011 CFR
2011-10-01
...-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-7 Wiring of boat winch... electric installation from all sources of potential. The switch must be in series with and on the supply...
46 CFR 111.95-7 - Wiring of boat winch components.
Code of Federal Regulations, 2014 CFR
2014-10-01
...-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-7 Wiring of boat winch... electric installation from all sources of potential. The switch must be in series with and on the supply...
49 CFR 1248.101 - Commodity codes required.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Hardware. 343 Plumbing Fixtures and Heating Apparatus, Except Electric. 3433 Heating equipment, except electric. 344 Fabricated structural metal products. 3441 Fabricated structural metal products. 345 Bolts... fabricated pipe fittings. 35 Machinery, Except Electrical. 351 Engines and Turbines. 352 Farm Machinery and...
49 CFR 1248.101 - Commodity codes required.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Hardware. 343 Plumbing Fixtures and Heating Apparatus, Except Electric. 3433 Heating equipment, except electric. 344 Fabricated structural metal products. 3441 Fabricated structural metal products. 345 Bolts... fabricated pipe fittings. 35 Machinery, Except Electrical. 351 Engines and Turbines. 352 Farm Machinery and...
49 CFR 1248.101 - Commodity codes required.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Hardware. 343 Plumbing Fixtures and Heating Apparatus, Except Electric. 3433 Heating equipment, except electric. 344 Fabricated structural metal products. 3441 Fabricated structural metal products. 345 Bolts... fabricated pipe fittings. 35 Machinery, Except Electrical. 351 Engines and Turbines. 352 Farm Machinery and...
49 CFR 1248.101 - Commodity codes required.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Hardware. 343 Plumbing Fixtures and Heating Apparatus, Except Electric. 3433 Heating equipment, except electric. 344 Fabricated structural metal products. 3441 Fabricated structural metal products. 345 Bolts... fabricated pipe fittings. 35 Machinery, Except Electrical. 351 Engines and Turbines. 352 Farm Machinery and...
76 FR 64291 - Airworthiness Directives; General Electric Company (GE) Turbofan Engines
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-18
... Company (GE) Turbofan Engines AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of... turbofan engines, including engines marked on the engine data plate as CF6-80C2B7F1. This proposed AD was... on engines in service. This proposed AD would require a one- time inspection of the No. 3 bearing...
46 CFR 11.516 - Service requirements for third assistant engineer of steam and/or motor vessels.
Code of Federal Regulations, 2010 CFR
2010-10-01
...) Graduation from the marine engineering course of a school of technology accredited by the Accreditation Board for Engineering and Technology, together with three months of service in the engine department of steam or motor vessels; (5) Graduation from the mechanical or electrical engineering course of a school...
77 FR 4650 - Airworthiness Directives; General Electric Company Turbofan Engines
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-31
... blade borescope inspection (BSI) or a failed engine core vibration survey, establishes a new lower life... LPT rotor stage 3 disk removal after a failed HPT blade BSI or a failed engine core vibration survey... engine test cell as part of an engine manual performance run fulfill the vibration survey requirements of...
46 CFR 113.30-20 - General requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false General requirements. 113.30-20 Section 113.30-20 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND... for the operation of the vessel, such as the captain's and chief engineer's offices and staterooms...
46 CFR 113.30-20 - General requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false General requirements. 113.30-20 Section 113.30-20 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND... for the operation of the vessel, such as the captain's and chief engineer's offices and staterooms...
46 CFR 113.30-20 - General requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false General requirements. 113.30-20 Section 113.30-20 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND... for the operation of the vessel, such as the captain's and chief engineer's offices and staterooms...
46 CFR 113.30-20 - General requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false General requirements. 113.30-20 Section 113.30-20 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND... for the operation of the vessel, such as the captain's and chief engineer's offices and staterooms...
46 CFR 113.30-20 - General requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false General requirements. 113.30-20 Section 113.30-20 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND... for the operation of the vessel, such as the captain's and chief engineer's offices and staterooms...
46 CFR 110.25-1 - Plans and information required for new construction.
Code of Federal Regulations, 2011 CFR
2011-10-01
....25-1 Section 110.25-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Plan Submittal § 110.25-1 Plans and information required for new construction... available at the point of application. (b) Electrical plant load analysis including connected loads and...
46 CFR 111.30-19 - Buses and wiring.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Buses and wiring. 111.30-19 Section 111.30-19 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-19 Buses and wiring. (a) General. Each bus must meet the requirements of...
46 CFR 111.30-19 - Buses and wiring.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Buses and wiring. 111.30-19 Section 111.30-19 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-19 Buses and wiring. (a) General. Each bus must meet the requirements of...
46 CFR 110.25-1 - Plans and information required for new construction.
Code of Federal Regulations, 2014 CFR
2014-10-01
....25-1 Section 110.25-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Plan Submittal § 110.25-1 Plans and information required for new construction... available at the point of application. (b) Electrical plant load analysis including connected loads and...
46 CFR 111.30-19 - Buses and wiring.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Buses and wiring. 111.30-19 Section 111.30-19 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-19 Buses and wiring. (a) General. Each bus must meet the requirements of...
46 CFR 111.30-19 - Buses and wiring.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Buses and wiring. 111.30-19 Section 111.30-19 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-19 Buses and wiring. (a) General. Each bus must meet the requirements of...
46 CFR 194.20-19 - Piping and electrical requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... VESSELS HANDLING, USE, AND CONTROL OF EXPLOSIVES AND OTHER HAZARDOUS MATERIALS Chemical Stores and/or... not be installed within or pass through a chemical storeroom except as required for the chemical... Subchapter J (Electrical Engineering) of this chapter for Class I, Division 1, Group C hazardous locations. ...
46 CFR 194.20-19 - Piping and electrical requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... VESSELS HANDLING, USE, AND CONTROL OF EXPLOSIVES AND OTHER HAZARDOUS MATERIALS Chemical Stores and/or... not be installed within or pass through a chemical storeroom except as required for the chemical... Subchapter J (Electrical Engineering) of this chapter for Class I, Division 1, Group C hazardous locations. ...
46 CFR 194.20-19 - Piping and electrical requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... VESSELS HANDLING, USE, AND CONTROL OF EXPLOSIVES AND OTHER HAZARDOUS MATERIALS Chemical Stores and/or... not be installed within or pass through a chemical storeroom except as required for the chemical... Subchapter J (Electrical Engineering) of this chapter for Class I, Division 1, Group C hazardous locations. ...
46 CFR 194.20-19 - Piping and electrical requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... VESSELS HANDLING, USE, AND CONTROL OF EXPLOSIVES AND OTHER HAZARDOUS MATERIALS Chemical Stores and/or... not be installed within or pass through a chemical storeroom except as required for the chemical... Subchapter J (Electrical Engineering) of this chapter for Class I, Division 1, Group C hazardous locations. ...
46 CFR 194.20-19 - Piping and electrical requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... VESSELS HANDLING, USE, AND CONTROL OF EXPLOSIVES AND OTHER HAZARDOUS MATERIALS Chemical Stores and/or... not be installed within or pass through a chemical storeroom except as required for the chemical... Subchapter J (Electrical Engineering) of this chapter for Class I, Division 1, Group C hazardous locations. ...
40 CFR 86.1773-99 - Test sequence; general requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... paragraph (c) of this section shall apply. For all hybrid electric vehicles and all 1995 and subsequent... required for fuel-flexible and dual-fuel vehicles when operating on gasoline. Natural gas, hybrid electric...) AIR PROGRAMS (CONTINUED) CONTROL OF EMISSIONS FROM NEW AND IN-USE HIGHWAY VEHICLES AND ENGINES...
ERIC Educational Resources Information Center
Lakonpol, Thongmee; Ruangsuwan, Chaiyot; Terdtoon, Pradit
2015-01-01
This research aimed to develop a web-based learning environment model for enhancing cognitive skills of undergraduate students in the field of electrical engineering. The research is divided into 4 phases: 1) investigating the current status and requirements of web-based learning environment models. 2) developing a web-based learning environment…
46 CFR 113.35-3 - General requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND ALARM...-propelled vessel, except as provided in paragraph (d) of this section, must have an electric or mechanical... must be electrically separate and independent, except that a single mechanical operator control device...
46 CFR 113.35-3 - General requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND ALARM...-propelled vessel, except as provided in paragraph (d) of this section, must have an electric or mechanical... must be electrically separate and independent, except that a single mechanical operator control device...
46 CFR 113.35-3 - General requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND ALARM...-propelled vessel, except as provided in paragraph (d) of this section, must have an electric or mechanical... must be electrically separate and independent, except that a single mechanical operator control device...
46 CFR 113.35-3 - General requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND ALARM...-propelled vessel, except as provided in paragraph (d) of this section, must have an electric or mechanical... must be electrically separate and independent, except that a single mechanical operator control device...
46 CFR 113.35-3 - General requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND ALARM...-propelled vessel, except as provided in paragraph (d) of this section, must have an electric or mechanical... must be electrically separate and independent, except that a single mechanical operator control device...
46 CFR 111.97-9 - Overcurrent protection.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-9 Overcurrent protection. Overcurrent devices must be arranged to isolate a fault with as little disruption of the system as possible...
7 CFR 1724.4 - Qualifications.
Code of Federal Regulations, 2013 CFR
2013-01-01
... ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES General § 1724.4 Qualifications. The borrower shall ensure that: (a) All selected architects and engineers meet the applicable... architects and engineers are familiar with RUS standards and requirements; and (c) All selected architects...
7 CFR 1724.4 - Qualifications.
Code of Federal Regulations, 2011 CFR
2011-01-01
... ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES General § 1724.4 Qualifications. The borrower shall ensure that: (a) All selected architects and engineers meet the applicable... architects and engineers are familiar with RUS standards and requirements; and (c) All selected architects...
7 CFR 1724.4 - Qualifications.
Code of Federal Regulations, 2014 CFR
2014-01-01
... ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES General § 1724.4 Qualifications. The borrower shall ensure that: (a) All selected architects and engineers meet the applicable... architects and engineers are familiar with RUS standards and requirements; and (c) All selected architects...
7 CFR 1724.4 - Qualifications.
Code of Federal Regulations, 2012 CFR
2012-01-01
... ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES General § 1724.4 Qualifications. The borrower shall ensure that: (a) All selected architects and engineers meet the applicable... architects and engineers are familiar with RUS standards and requirements; and (c) All selected architects...
7 CFR 1724.4 - Qualifications.
Code of Federal Regulations, 2010 CFR
2010-01-01
... ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES General § 1724.4 Qualifications. The borrower shall ensure that: (a) All selected architects and engineers meet the applicable... architects and engineers are familiar with RUS standards and requirements; and (c) All selected architects...
46 CFR 162.060-20 - Design and construction requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., AND MATERIALS: SPECIFICATIONS AND APPROVAL ENGINEERING EQUIPMENT Ballast Water Management Systems... service; (4) Meets recognized national or international standards for all related marine engineering and electrical engineering applications; and (5) Operates when the vessel is upright, inclined under static...
46 CFR 162.060-20 - Design and construction requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
..., AND MATERIALS: SPECIFICATIONS AND APPROVAL ENGINEERING EQUIPMENT Ballast Water Management Systems... service; (4) Meets recognized national or international standards for all related marine engineering and electrical engineering applications; and (5) Operates when the vessel is upright, inclined under static...
46 CFR 162.060-20 - Design and construction requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
..., AND MATERIALS: SPECIFICATIONS AND APPROVAL ENGINEERING EQUIPMENT Ballast Water Management Systems... service; (4) Meets recognized national or international standards for all related marine engineering and electrical engineering applications; and (5) Operates when the vessel is upright, inclined under static...
SSME Electrical Harness and Cable Development and Evolution
NASA Technical Reports Server (NTRS)
Abrams, Russ; Heflin, Johnny; Burns, Bob; Camper, Scott J.; Hill, Arthur J.
2010-01-01
The Space Shuttle Main Engine (SSME) electrical harness and cable system consists of the various interconnecting devices necessary for operation of complex rocket engine functions. Thirty seven harnesses incorporate unique connectors, backshell adapters, conductors, insulation, shielding, and physical barriers for a long maintenance-free life while providing the means to satisfy performance requirements and to mitigate adverse environmental influences. The objective of this paper is to provide a description of the SSME electrical harness and cable designs as well as the development history and lessons learned.
Code of Federal Regulations, 2011 CFR
2011-04-01
... résumés of their experience. (3) The names of engineers practicing electrical engineering who will be... Standard E-541 except that the requirement for registration as a professional engineer or architect may be waived for personnel whose qualifications by experience or education equal those of a registered engineer...
Code of Federal Regulations, 2010 CFR
2010-04-01
... résumés of their experience. (3) The names of engineers practicing electrical engineering who will be... Standard E-541 except that the requirement for registration as a professional engineer or architect may be waived for personnel whose qualifications by experience or education equal those of a registered engineer...
Code of Federal Regulations, 2012 CFR
2012-04-01
... résumés of their experience. (3) The names of engineers practicing electrical engineering who will be... Standard E-541 except that the requirement for registration as a professional engineer or architect may be waived for personnel whose qualifications by experience or education equal those of a registered engineer...
Code of Federal Regulations, 2013 CFR
2013-04-01
... résumés of their experience. (3) The names of engineers practicing electrical engineering who will be... Standard E-541 except that the requirement for registration as a professional engineer or architect may be waived for personnel whose qualifications by experience or education equal those of a registered engineer...
Code of Federal Regulations, 2014 CFR
2014-04-01
... résumés of their experience. (3) The names of engineers practicing electrical engineering who will be... Standard E-541 except that the requirement for registration as a professional engineer or architect may be waived for personnel whose qualifications by experience or education equal those of a registered engineer...
7 CFR 1788.49 - Contractors' bond requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
..., DEPARTMENT OF AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers...
7 CFR 1788.49 - Contractors' bond requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
..., DEPARTMENT OF AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers...
7 CFR 1788.49 - Contractors' bond requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
..., DEPARTMENT OF AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers...
7 CFR 1788.49 - Contractors' bond requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
..., DEPARTMENT OF AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers...
7 CFR 1788.49 - Contractors' bond requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
..., DEPARTMENT OF AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers...
Electrical Prototype Power Processor for the 30-cm Mercury electric propulsion engine
NASA Technical Reports Server (NTRS)
Biess, J. J.; Frye, R. J.
1978-01-01
An Electrical Prototpye Power Processor has been designed to the latest electrical and performance requirements for a flight-type 30-cm ion engine and includes all the necessary power, command, telemetry and control interfaces for a typical electric propulsion subsystem. The power processor was configured into seven separate mechanical modules that would allow subassembly fabrication, test and integration into a complete power processor unit assembly. The conceptual mechanical packaging of the electrical prototype power processor unit demonstrated the relative location of power, high voltage and control electronic components to minimize electrical interactions and to provide adequate thermal control in a vacuum environment. Thermal control was accomplished with a heat pipe simulator attached to the base of the modules.
46 CFR 107.231 - Inspection for certification.
Code of Federal Regulations, 2010 CFR
2010-10-01
... chapter, Electrical Engineering; 1 1 Requirements for industrial systems and components are in Subpart 111.94 of this chapter. (3) Subchapter F of this chapter, Marine Engineering; 2 2 Requirements for industrial systems and components are in Subpart 58.60 of this chapter. (4) Subchapter E of this chapter...
46 CFR 107.231 - Inspection for certification.
Code of Federal Regulations, 2014 CFR
2014-10-01
... chapter, Electrical Engineering; 1 1 Requirements for industrial systems and components are in Subpart 111.94 of this chapter. (3) Subchapter F of this chapter, Marine Engineering; 2 2 Requirements for industrial systems and components are in Subpart 58.60 of this chapter. (4) Subchapter E of this chapter...
46 CFR 107.231 - Inspection for certification.
Code of Federal Regulations, 2013 CFR
2013-10-01
... chapter, Electrical Engineering; 1 1 Requirements for industrial systems and components are in Subpart 111.94 of this chapter. (3) Subchapter F of this chapter, Marine Engineering; 2 2 Requirements for industrial systems and components are in Subpart 58.60 of this chapter. (4) Subchapter E of this chapter...
46 CFR 107.231 - Inspection for certification.
Code of Federal Regulations, 2011 CFR
2011-10-01
... chapter, Electrical Engineering; 1 1 Requirements for industrial systems and components are in Subpart 111.94 of this chapter. (3) Subchapter F of this chapter, Marine Engineering; 2 2 Requirements for industrial systems and components are in Subpart 58.60 of this chapter. (4) Subchapter E of this chapter...
46 CFR 107.231 - Inspection for certification.
Code of Federal Regulations, 2012 CFR
2012-10-01
... chapter, Electrical Engineering; 1 1 Requirements for industrial systems and components are in Subpart 111.94 of this chapter. (3) Subchapter F of this chapter, Marine Engineering; 2 2 Requirements for industrial systems and components are in Subpart 58.60 of this chapter. (4) Subchapter E of this chapter...
49 CFR 579.21 - Reporting requirements for manufacturers of 5,000 or more light vehicles annually.
Code of Federal Regulations, 2014 CFR
2014-10-01
... (compressed natural gas), CIF (compression ignition fuel), EBP (electric battery power), FCP (fuel-cell power... (electric battery power), FCP (fuel-cell power), HEV (hybrid electric vehicle), HCP (hydrogen combustion... and engine cooling system, 07 fuel system, 10 power train, 11 electrical system, 12 exterior lighting...
46 CFR 111.01-17 - Voltage and frequency variations.
Code of Federal Regulations, 2013 CFR
2013-10-01
....01-17 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-17 Voltage and frequency variations. Unless otherwise stated, electrical equipment must function at variations of at least ±5 percent of rated frequency...
46 CFR 111.01-17 - Voltage and frequency variations.
Code of Federal Regulations, 2010 CFR
2010-10-01
....01-17 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-17 Voltage and frequency variations. Unless otherwise stated, electrical equipment must function at variations of at least ±5 percent of rated frequency...
46 CFR 111.01-17 - Voltage and frequency variations.
Code of Federal Regulations, 2011 CFR
2011-10-01
....01-17 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-17 Voltage and frequency variations. Unless otherwise stated, electrical equipment must function at variations of at least ±5 percent of rated frequency...
46 CFR 111.01-17 - Voltage and frequency variations.
Code of Federal Regulations, 2012 CFR
2012-10-01
....01-17 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-17 Voltage and frequency variations. Unless otherwise stated, electrical equipment must function at variations of at least ±5 percent of rated frequency...
46 CFR 111.01-17 - Voltage and frequency variations.
Code of Federal Regulations, 2014 CFR
2014-10-01
....01-17 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-17 Voltage and frequency variations. Unless otherwise stated, electrical equipment must function at variations of at least ±5 percent of rated frequency...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Appliances. 111.77-3 Section 111.77-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Appliances and Appliance Circuits § 111.77-3 Appliances. All electrical appliances, including, but...
46 CFR 111.97-9 - Overcurrent protection.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Overcurrent protection. 111.97-9 Section 111.97-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-9 Overcurrent protection...
46 CFR 111.97-9 - Overcurrent protection.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Overcurrent protection. 111.97-9 Section 111.97-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-9 Overcurrent protection...
46 CFR 111.97-9 - Overcurrent protection.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Overcurrent protection. 111.97-9 Section 111.97-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-9 Overcurrent protection...
46 CFR 111.97-9 - Overcurrent protection.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Overcurrent protection. 111.97-9 Section 111.97-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-9 Overcurrent protection...
46 CFR 111.50-2 - Systems integration.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Systems integration. 111.50-2 Section 111.50-2 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-2 Systems integration. The electrical characteristics of each...
46 CFR 111.05-13 - Grounding connection.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Equipment Ground, Ground Detection, and Grounded Systems § 111.05-13 Grounding... power sources operating in parallel in the system. ...
Real-time simulation of an F110/STOVL turbofan engine
NASA Technical Reports Server (NTRS)
Drummond, Colin K.; Ouzts, Peter J.
1989-01-01
A traditional F110-type turbofan engine model was extended to include a ventral nozzle and two thrust-augmenting ejectors for Short Take-Off Vertical Landing (STOVL) aircraft applications. Development of the real-time F110/STOVL simulation required special attention to the modeling approach to component performance maps, the low pressure turbine exit mixing region, and the tailpipe dynamic approximation. Simulation validation derives by comparing output from the ADSIM simulation with the output for a validated F110/STOVL General Electric Aircraft Engines FORTRAN deck. General Electric substantiated basic engine component characteristics through factory testing and full scale ejector data.
46 CFR 111.30-24 - Generation systems greater than 3000 kw.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Section 111.30-24 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-24 Generation systems greater than 3000 kw... Outer Continental Shelf facility, when the total installed electric power of the ship's service...
46 CFR 111.30-24 - Generation systems greater than 3000 kw.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 111.30-24 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-24 Generation systems greater than 3000 kw... Outer Continental Shelf facility, when the total installed electric power of the ship's service...
46 CFR 111.30-24 - Generation systems greater than 3000 kw.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Section 111.30-24 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-24 Generation systems greater than 3000 kw... Outer Continental Shelf facility, when the total installed electric power of the ship's service...
46 CFR 111.30-24 - Generation systems greater than 3000 kw.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Section 111.30-24 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-24 Generation systems greater than 3000 kw... Outer Continental Shelf facility, when the total installed electric power of the ship's service...
46 CFR 111.30-24 - Generation systems greater than 3000 kw.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Section 111.30-24 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-24 Generation systems greater than 3000 kw... Outer Continental Shelf facility, when the total installed electric power of the ship's service...
46 CFR 111.91-1 - Power, control, and interlock circuits.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 111.91-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Elevators and Dumbwaiters § 111.91-1 Power, control, and interlock circuits. Each electric power, control, and interlock circuit of an elevator or dumbwaiter must meet ASME...
46 CFR 111.91-1 - Power, control, and interlock circuits.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 111.91-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Elevators and Dumbwaiters § 111.91-1 Power, control, and interlock circuits. Each electric power, control, and interlock circuit of an elevator or dumbwaiter must meet ASME...
46 CFR 111.91-1 - Power, control, and interlock circuits.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 111.91-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Elevators and Dumbwaiters § 111.91-1 Power, control, and interlock circuits. Each electric power, control, and interlock circuit of an elevator or dumbwaiter must meet ASME...
46 CFR 111.91-1 - Power, control, and interlock circuits.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 111.91-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Elevators and Dumbwaiters § 111.91-1 Power, control, and interlock circuits. Each electric power, control, and interlock circuit of an elevator or dumbwaiter must meet ASME...
46 CFR 111.91-1 - Power, control, and interlock circuits.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 111.91-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Elevators and Dumbwaiters § 111.91-1 Power, control, and interlock circuits. Each electric power, control, and interlock circuit of an elevator or dumbwaiter must meet ASME...
46 CFR 111.105-41 - Battery rooms.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Battery rooms. 111.105-41 Section 111.105-41 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-41 Battery rooms. Each electrical installation in a battery room...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false General. 111.01-1 Section 111.01-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-1 General. (a) Electric installations on vessels must ensure: (1) Maintenance of services...
46 CFR 111.01-9 - Degrees of protection.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Degrees of protection. 111.01-9 Section 111.01-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-9 Degrees of protection. (a) Interior electrical equipment exposed...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false General. 111.01-1 Section 111.01-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-1 General. (a) Electric installations on vessels must ensure: (1) Maintenance of services...
46 CFR 111.105-41 - Battery rooms.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Battery rooms. 111.105-41 Section 111.105-41 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-41 Battery rooms. Each electrical installation in a battery room...
46 CFR 111.105-41 - Battery rooms.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Battery rooms. 111.105-41 Section 111.105-41 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-41 Battery rooms. Each electrical installation in a battery room...
46 CFR 111.105-41 - Battery rooms.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Battery rooms. 111.105-41 Section 111.105-41 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-41 Battery rooms. Each electrical installation in a battery room...
46 CFR 111.105-41 - Battery rooms.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Battery rooms. 111.105-41 Section 111.105-41 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-41 Battery rooms. Each electrical installation in a battery room...
7 CFR 1717.604 - Long-range engineering plans and construction work plans.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 11 2010-01-01 2010-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...
7 CFR 1717.604 - Long-range engineering plans and construction work plans.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 11 2013-01-01 2013-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...
7 CFR 1717.604 - Long-range engineering plans and construction work plans.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 11 2014-01-01 2014-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...
7 CFR 1717.604 - Long-range engineering plans and construction work plans.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 11 2012-01-01 2012-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...
7 CFR 1717.604 - Long-range engineering plans and construction work plans.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 11 2011-01-01 2011-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...
7 CFR 1724.10 - Standard forms of contracts for borrowers.
Code of Federal Regulations, 2010 CFR
2010-01-01
... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND..., engineering services, and architectural services financed by a loan made or guaranteed by RUS. This part... how borrowers are required to use RUS standard forms of contracts for engineering and architectural...
48 CFR 52.236-25 - Requirements for Registration of Designers.
Code of Federal Regulations, 2013 CFR
2013-10-01
... engineers registered to practice in the particular professional field involved in a State, the District of... architectural, structural, mechanical, electrical, civil, or other engineering features of the work. (End of...
48 CFR 52.236-25 - Requirements for Registration of Designers.
Code of Federal Regulations, 2014 CFR
2014-10-01
... engineers registered to practice in the particular professional field involved in a State, the District of... architectural, structural, mechanical, electrical, civil, or other engineering features of the work. (End of...
48 CFR 52.236-25 - Requirements for Registration of Designers.
Code of Federal Regulations, 2011 CFR
2011-10-01
... engineers registered to practice in the particular professional field involved in a State, the District of... architectural, structural, mechanical, electrical, civil, or other engineering features of the work. (End of...
48 CFR 52.236-25 - Requirements for Registration of Designers.
Code of Federal Regulations, 2010 CFR
2010-10-01
... engineers registered to practice in the particular professional field involved in a State, the District of... architectural, structural, mechanical, electrical, civil, or other engineering features of the work. (End of...
48 CFR 52.236-25 - Requirements for Registration of Designers.
Code of Federal Regulations, 2012 CFR
2012-10-01
... engineers registered to practice in the particular professional field involved in a State, the District of... architectural, structural, mechanical, electrical, civil, or other engineering features of the work. (End of...
33 CFR 143.120 - Floating OCS facilities.
Code of Federal Regulations, 2014 CFR
2014-07-01
... (Marine Engineering) and J (Electrical Engineering) of 46 CFR chapter I and 46 CFR part 108 (Design and... that provide an equivalent level of safety may be accepted. These requirements do not apply to...
33 CFR 143.120 - Floating OCS facilities.
Code of Federal Regulations, 2012 CFR
2012-07-01
... (Marine Engineering) and J (Electrical Engineering) of 46 CFR chapter I and 46 CFR part 108 (Design and... that provide an equivalent level of safety may be accepted. These requirements do not apply to...
33 CFR 143.120 - Floating OCS facilities.
Code of Federal Regulations, 2011 CFR
2011-07-01
... (Marine Engineering) and J (Electrical Engineering) of 46 CFR chapter I and 46 CFR part 108 (Design and... that provide an equivalent level of safety may be accepted. These requirements do not apply to...
NASA Technical Reports Server (NTRS)
Barnett, John W.
1991-01-01
Nuclear propulsion technology offers substantial benefits to the ambitious piloted and robotic solar system exploration missions of the Space Exploration Initiative (SEI). This paper summarizes a workshop jointly sponsored by NASA, DoE, and DoD to assess candidate nuclear electric propulsion technologies. Twenty-one power and propulsion concepts are reviewed. Nuclear power concepts include solid and gaseous fuel concepts, with static and dynamic power conversion. Propulsion concepts include steady state and pulsed electromagnetic engines, a pulsed electrothermal engine, and a steady state electrostatic engine. The technologies vary widely in maturity. The workshop review panels concluded that compelling benefits would accrue from the development of nuclear electric propulsion systems, and that a focused, well-funded program is required to prepare the technologies for SEI missions.
Conceptual design of an advanced Stirling conversion system for terrestrial power generation
NASA Technical Reports Server (NTRS)
1988-01-01
A free piston Stirling engine coupled to an electric generator or alternator with a nominal kWe power output absorbing thermal energy from a nominal 100 square meter parabolic solar collector and supplying electric power to a utility grid was identified. The results of the conceptual design study of an Advanced Stirling Conversion System (ASCS) were documented. The objectives are as follows: define the ASCS configuration; provide a manufacturability and cost evaluation; predict ASCS performance over the range of solar input required to produce power; estimate system and major component weights; define engine and electrical power condidtioning control requirements; and define key technology needs not ready by the late 1980s in meeting efficiency, life, cost, and with goalds for the ASCS.
18 CFR 12.43 - Power and communication lines and gas pipelines.
Code of Federal Regulations, 2013 CFR
2013-04-01
... reasonable specifications that may be provided by the Regional Engineer, to ensure that any power or... waters must be at least sufficient to conform to any applicable requirements of the National Electrical... Engineer may require a licensee or applicant to provide signs at or near power or communication lines to...
18 CFR 12.43 - Power and communication lines and gas pipelines.
Code of Federal Regulations, 2012 CFR
2012-04-01
... reasonable specifications that may be provided by the Regional Engineer, to ensure that any power or... waters must be at least sufficient to conform to any applicable requirements of the National Electrical... Engineer may require a licensee or applicant to provide signs at or near power or communication lines to...
18 CFR 12.43 - Power and communication lines and gas pipelines.
Code of Federal Regulations, 2014 CFR
2014-04-01
... reasonable specifications that may be provided by the Regional Engineer, to ensure that any power or... waters must be at least sufficient to conform to any applicable requirements of the National Electrical... Engineer may require a licensee or applicant to provide signs at or near power or communication lines to...
18 CFR 12.43 - Power and communication lines and gas pipelines.
Code of Federal Regulations, 2011 CFR
2011-04-01
... reasonable specifications that may be provided by the Regional Engineer, to ensure that any power or... waters must be at least sufficient to conform to any applicable requirements of the National Electrical... Engineer may require a licensee or applicant to provide signs at or near power or communication lines to...
18 CFR 12.43 - Power and communication lines and gas pipelines.
Code of Federal Regulations, 2010 CFR
2010-04-01
... reasonable specifications that may be provided by the Regional Engineer, to ensure that any power or... waters must be at least sufficient to conform to any applicable requirements of the National Electrical... Engineer may require a licensee or applicant to provide signs at or near power or communication lines to...
40 CFR 60.4216 - What requirements must I meet for engines used in Alaska?
Code of Federal Regulations, 2010 CFR
2010-07-01
... engines used in Alaska? 60.4216 Section 60.4216 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... alternative plan for implementing the requirements of 40 CFR part 60, subpart IIII, for public-sector electrical utilities located in rural areas of Alaska not accessible by the Federal Aid Highway System. This...
Characterization of advanced electric propulsion systems
NASA Technical Reports Server (NTRS)
Ray, P. K.
1982-01-01
Characteristics of several advanced electric propulsion systems are evaluated and compared. The propulsion systems studied are mass driver, rail gun, MPD thruster, hydrogen free radical thruster and mercury electron bombardment ion engine. These are characterized by specific impulse, overall efficiency, input power, average thrust, power to average thrust ratio and average thrust to dry weight ratio. Several important physical characteristics such as dry system mass, accelerator length, bore size and current pulse requirement are also evaluated in appropriate cases. Only the ion engine can operate at a specific impulse beyond 2000 sec. Rail gun, MPD thruster and free radical thruster are currently characterized by low efficiencies. Mass drivers have the best performance characteristics in terms of overall efficiency, power to average thrust ratio and average thrust to dry weight ratio. But, they can only operate at low specific impulses due to large power requirements and are extremely long due to limitations of driving current. Mercury ion engines have the next best performance characteristics while operating at higher specific impulses. It is concluded that, overall, ion engines have somewhat better characteristics as compared to the other electric propulsion systems.
46 CFR 111.01-11 - Corrosion-resistant parts.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Corrosion-resistant parts. 111.01-11 Section 111.01-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-11 Corrosion-resistant parts. Each enclosure and part of electric...
77 FR 4275 - Submission for OMB Review; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-27
... number. Rural Utilities Service Title: 7 CFR Part 1724 and Part 1738 Electric Engineering, Architectural... improving of electric energy to persons in rural areas. Title 7 CFR 1724 requires each borrower to select a... forms provide standardized contract agreements between the electric or broadband borrower and the...
46 CFR 111.01-3 - Placement of equipment.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Placement of equipment. 111.01-3 Section 111.01-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-3 Placement of equipment. (a) Electric equipment must be arranged...
46 CFR 111.01-11 - Corrosion-resistant parts.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Corrosion-resistant parts. 111.01-11 Section 111.01-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-11 Corrosion-resistant parts. Each enclosure and part of electric...
46 CFR 111.01-3 - Placement of equipment.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Placement of equipment. 111.01-3 Section 111.01-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-3 Placement of equipment. (a) Electric equipment must be arranged...
46 CFR 111.01-11 - Corrosion-resistant parts.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Corrosion-resistant parts. 111.01-11 Section 111.01-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-11 Corrosion-resistant parts. Each enclosure and part of electric...
46 CFR 111.01-3 - Placement of equipment.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Placement of equipment. 111.01-3 Section 111.01-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-3 Placement of equipment. (a) Electric equipment must be arranged...
46 CFR 111.01-11 - Corrosion-resistant parts.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Corrosion-resistant parts. 111.01-11 Section 111.01-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-11 Corrosion-resistant parts. Each enclosure and part of electric...
46 CFR 111.01-3 - Placement of equipment.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Placement of equipment. 111.01-3 Section 111.01-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-3 Placement of equipment. (a) Electric equipment must be arranged...
46 CFR 111.01-11 - Corrosion-resistant parts.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Corrosion-resistant parts. 111.01-11 Section 111.01-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-11 Corrosion-resistant parts. Each enclosure and part of electric...
46 CFR 111.01-3 - Placement of equipment.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Placement of equipment. 111.01-3 Section 111.01-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-3 Placement of equipment. (a) Electric equipment must be arranged...
77 FR 42677 - Special Conditions: General Electric CT7-2E1 Turboshaft Engine
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-20
... Mihail, ANE-111, Engine and Propeller Directorate, Aircraft Certification Service, 12 New England..., ANE-7 Engine and Propeller Directorate, Aircraft Certification Service, 12 New England Executive Park... additional requirements for the rating's definition, overspeed, controls system, and endurance test because...
Nuclear electric propulsion mission engineering study. Volume 1: Executive summary
NASA Technical Reports Server (NTRS)
1973-01-01
Results of a mission engineering analysis of nuclear-thermionic electric propulsion spacecraft for unmanned interplanetary and geocentric missions are summarized. Critical technologies associated with the development of nuclear electric propulsion (NEP) are assessed. Outer planet and comet rendezvous mission analysis, NEP stage design for geocentric and interplanetary missions, NEP system development cost and unit costs, and technology requirements for NEP stage development are studied. The NEP stage design provides both inherent reliability and high payload mass capability. The NEP stage and payload integration was found to be compatible with the space shuttle.
Energy: Education and Industry Changes for a New Era Utilization System Modifications.
ERIC Educational Resources Information Center
Dille, Earl K.; Dreifke, Gerald E.
This paper provides data and opinions on long- and short-term challenges and changes required to meet the human resource and educational needs in a nuclear electric era as seen from a utility company's point of view. In particular, statements on engineering education curriculum, statistics on certain future manpower requirements, electric utility…
Project CAD as of July 1978: CAD support project, situation in July 1978
NASA Technical Reports Server (NTRS)
Boesch, L.; Lang-Lendorff, G.; Rothenberg, R.; Stelzer, V.
1979-01-01
The structure of Computer Aided Design (CAD) and the requirements for program developments in past and future are described. The actual standard and the future aims of CAD programs are presented. The developed programs in: (1) civil engineering; (2) mechanical engineering; (3) chemical engineering/shipbuilding; (4) electrical engineering; and (5) general programs are discussed.
ERIC Educational Resources Information Center
Tang, Shensheng
2014-01-01
Microcontrollers is a required course in most Electrical, Computer, and Mechanic Engineering (Technology) programs at U.S. universities. Most engineering courses (e.g., microcontrollers), by nature, introduce abstract concepts, definitions, and models, and use primarily lectures and readings (words, symbols) to transmit information. This…
Introducing Optical Concepts in Electrical Engineering.
ERIC Educational Resources Information Center
Daneshvar, K.; Coleman, R.
The expansion in the fields of optical engineering and optoelectronics has made it essential to introduce optical engineering concepts into undergraduate courses and curricula. Because of limits on the number of course requirements for the BS degree, it is not clear how these topics should be introduced without replacing some of the traditional…
46 CFR 52.25-7 - Electric boilers (modifies PEB-1 through PEB-19).
Code of Federal Regulations, 2011 CFR
2011-10-01
... ENGINEERING POWER BOILERS Other Boiler Types § 52.25-7 Electric boilers (modifies PEB-1 through PEB-19). Electric boilers required to comply with this part must meet the applicable provisions in this part and the... 46 Shipping 2 2011-10-01 2011-10-01 false Electric boilers (modifies PEB-1 through PEB-19). 52.25...
46 CFR 52.25-7 - Electric boilers (modifies PEB-1 through PEB-19).
Code of Federal Regulations, 2010 CFR
2010-10-01
... ENGINEERING POWER BOILERS Other Boiler Types § 52.25-7 Electric boilers (modifies PEB-1 through PEB-19). Electric boilers required to comply with this part must meet the applicable provisions in this part and the... 46 Shipping 2 2010-10-01 2010-10-01 false Electric boilers (modifies PEB-1 through PEB-19). 52.25...
46 CFR 52.25-7 - Electric boilers (modifies PEB-1 through PEB-19).
Code of Federal Regulations, 2012 CFR
2012-10-01
... ENGINEERING POWER BOILERS Other Boiler Types § 52.25-7 Electric boilers (modifies PEB-1 through PEB-19). Electric boilers required to comply with this part must meet the applicable provisions in this part and the... 46 Shipping 2 2012-10-01 2012-10-01 false Electric boilers (modifies PEB-1 through PEB-19). 52.25...
46 CFR 52.25-7 - Electric boilers (modifies PEB-1 through PEB-19).
Code of Federal Regulations, 2014 CFR
2014-10-01
... ENGINEERING POWER BOILERS Other Boiler Types § 52.25-7 Electric boilers (modifies PEB-1 through PEB-19). Electric boilers required to comply with this part must meet the applicable provisions in this part and the... 46 Shipping 2 2014-10-01 2014-10-01 false Electric boilers (modifies PEB-1 through PEB-19). 52.25...
46 CFR 52.25-7 - Electric boilers (modifies PEB-1 through PEB-19).
Code of Federal Regulations, 2013 CFR
2013-10-01
... ENGINEERING POWER BOILERS Other Boiler Types § 52.25-7 Electric boilers (modifies PEB-1 through PEB-19). Electric boilers required to comply with this part must meet the applicable provisions in this part and the... 46 Shipping 2 2013-10-01 2013-10-01 false Electric boilers (modifies PEB-1 through PEB-19). 52.25...
77 FR 10950 - Airworthiness Directives; General Electric Company (GE) Turbofan Engines
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-24
...) for all GE CF6-80C2B series turbofan engines. That AD currently requires installing software version 8.... This new AD requires the removal of the affected ECUs from service. This AD was prompted by two reports... ECUs from service. Comments We gave the public the opportunity to participate in developing this AD...
State-of-the-art assessment of electric vehicles and hybrid vehicles
NASA Technical Reports Server (NTRS)
1977-01-01
The Electric and Hybrid Vehicle Research, Development, and Demonstration Act of 1976 (PL 94-413) requires that data be developed to characterize the state of the art of vehicles powered by an electric motor and those propelled by a combination of an electric motor and an internal combustion engine or other power sources. Data obtained from controlled tests of a representative number of sample vehicles, from information supplied by manufacturers or contained in the literature, and from surveys of fleet operators of individual owners of electric vehicles is discussed. The results of track and dynamometer tests conducted by NASA on 22 electric, 2 hybrid, and 5 conventional vehicles, as well as on 5 spark-ignition-engine-powered vehicles, the conventional counterparts of 5 of the vehicles, are presented.
Design study of flat belt CVT for electric vehicles
NASA Technical Reports Server (NTRS)
Kumm, E. L.
1980-01-01
A continuously variable transmission (CVT) was studied, using a novel flat belt pulley arrangement which couples the high speed output shaft of an energy storage flywheel to the drive train of an electric vehicle. A specific CVT arrangement was recommended and its components were selected and sized, based on the design requirements of a 1700 KG vehicle. A design layout was prepared and engineering calculations made of component efficiencies and operating life. The transmission efficiency was calculated to be significantly over 90% with the expected vehicle operation. A design consistent with automotive practice for low future production costs was considered, together with maintainability. The technology advancements required to develop the flat belt CVT were identified and an estimate was made of how the size of the flat belt CVT scales to larger and smaller design output torques. The suitability of the flat belt CVT for alternate application to an electric vehicle powered by an electric motor without flywheel and to a hybrid electric vehicle powered by an electric motor with an internal combustion engine was studied.
46 CFR 111.20-10 - Autotransformers.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Autotransformers. 111.20-10 Section 111.20-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Transformer Construction, Installation, and Protection § 111.20-10 Autotransformers. An...
46 CFR 111.20-10 - Autotransformers.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Autotransformers. 111.20-10 Section 111.20-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Transformer Construction, Installation, and Protection § 111.20-10 Autotransformers. An...
46 CFR 111.20-10 - Autotransformers.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Autotransformers. 111.20-10 Section 111.20-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Transformer Construction, Installation, and Protection § 111.20-10 Autotransformers. An...
46 CFR 111.20-10 - Autotransformers.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Autotransformers. 111.20-10 Section 111.20-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Transformer Construction, Installation, and Protection § 111.20-10 Autotransformers. An...
46 CFR 111.20-10 - Autotransformers.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Autotransformers. 111.20-10 Section 111.20-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Transformer Construction, Installation, and Protection § 111.20-10 Autotransformers. An...
NASA Technical Reports Server (NTRS)
Adams, A.
1973-01-01
The Interface Control Document contains engine information necessary for installation of the baseline RL10 Derivative engines in the Space Tug vehicle. The ICD presents a description of the baseline engines and their operating characteristics, mass and load characteristics, and environmental criteria. The document defines the engine/vehicle mechanical, electrical, fluid and pneumatic interface requirements.
DOE Office of Scientific and Technical Information (OSTI.GOV)
none,
The C370 Program was awarded in October 2010 with the ambitious goal of designing and testing the most electrically efficient recuperated microturbine engine at a rated power of less than 500 kW. The aggressive targets for electrical efficiency, emission regulatory compliance, and the estimated price point make the system state-of-the-art for microturbine engine systems. These goals will be met by designing a two stage microturbine engine identified as the low pressure spool and high pressure spool that are based on derivative hardware of Capstone’s current commercially available engines. The development and testing of the engine occurred in two phases. Phasemore » I focused on developing a higher power and more efficient engine, that would become the low pressure spool which is based on Capstone’s C200 (200kW) engine architecture. Phase II integrated the low pressure spool created in Phase I with the high pressure spool, which is based on Capstone’s C65 (65 kW) commercially available engine. Integration of the engines, based on preliminary research, would allow the dual spool engine to provide electrical power in excess of 370 kW, with electrical efficiency approaching 42%. If both of these targets were met coupled with the overall CHP target of 85% total combined heating and electrical efficiency California Air Resources Board (CARB) level emissions, and a price target of $600 per kW, the system would represent a step change in the currently available commercial generation technology. Phase I of the C370 program required the development of the C370 low pressure spool. The goal was to increase the C200 engine power by a minimum of 25% — 250 kW — and efficiency from 32% to 37%. These increases in the C200 engine output were imperative to meet the power requirements of the engine when both spools were integrated. An additional benefit of designing and testing the C370 low pressure spool was the possibility of developing a stand-alone product for possible commercialization. The low pressure spool design activity focused on an aeropath derivative of the current C200 engine. The aeropath derivative included changes to the compressor section —compressor and inducer — and to the turbine nozzle. The increased power also necessitated a larger, more powerful generator and generator controller to support the increased power requirements. These two major design changes were completed by utilizing both advanced 3D modeling and computational fluid dynamics modelling. After design, modeling, and analysis, the decision was made to acquire and integrate the components for testing. The second task of Phase I was to integrate and test the components of the low pressure spool to validate power and efficiency. Acquisition of the components for the low pressure spool was completed utilizing Capstone’s current supplier base. Utilization of Capstone’s supply base for integration of the test article would allow — if the decision was made —expedited commercialization of the product. After integration of the engine components, the engine was tested and evaluated for performance and emissions. Test data analysis confirmed that the engine met all power and efficiency requirements and did so while maintaining CARB level emissions. The emissions were met without the use of any post processing or catalyst. After testing was completed, the DOE authorized — via a milestone review — proceeding to Phase II: the development of the integrated C370 engine. The C370 high pressure spool design activity required significant changes to the C65 engine architecture. The engine required a high power density generator, completely redesigned compressor stage, turbine section, recuperator, controls architecture, and intercooler stage asThe two most critical design challenges were the turbine section (the nozzle and turbine) and the controls architecture. The design and analysis of all of the components was completed and integrated into a system model. The system model — after numerous iterations — indicated that, once integrated, the engine will meet or exceed all system requirements. Unfortunately, the turbine section’s life requirements remain a technical challenge and will require continued refinement of the bi-metallic turbine wheel design and manufacturing approach to meet the life requirement at theses high temperatures. The current controls architecture requires substantial effort to develop a system capable of handling the high-speed, near real-time controls requirement, but it was determined not to be a technical roadblock for the project. The C370 Program has been a significant effort with state-of-the-art technical targets. The targets have pushed Capstone’s designers to the limits of current technology. The program has been fortunate to see many successes: the successful testing of the low pressure spool (C250), the development of new material processes, and the implementation of new design practices. The technology and practices learned during the program will be utilized in Capstone’s current product lines and future products. The C370 Program has been a resounding success on many fronts for the DOE and for Capstone.« less
Code of Federal Regulations, 2014 CFR
2014-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS... Generator as the Sole Emergency Power Source § 112.35-1 General. This subpart contains requirements applicable to emergency power installations having a manually controlled storage battery, diesel engine, or...
Code of Federal Regulations, 2012 CFR
2012-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS... Generator as the Sole Emergency Power Source § 112.35-1 General. This subpart contains requirements applicable to emergency power installations having a manually controlled storage battery, diesel engine, or...
Code of Federal Regulations, 2013 CFR
2013-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS... Generator as the Sole Emergency Power Source § 112.35-1 General. This subpart contains requirements applicable to emergency power installations having a manually controlled storage battery, diesel engine, or...
46 CFR 111.12-11 - Generator protection.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Generator protection. 111.12-11 Section 111.12-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-11 Generator protection. (a...
46 CFR 111.33-5 - Installation.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...
46 CFR 111.33-5 - Installation.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...
46 CFR 111.12-11 - Generator protection.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Generator protection. 111.12-11 Section 111.12-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-11 Generator protection. (a...
46 CFR 111.33-5 - Installation.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...
46 CFR 111.33-5 - Installation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...
46 CFR 111.12-11 - Generator protection.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Generator protection. 111.12-11 Section 111.12-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-11 Generator protection. (a...
7 CFR 1724.20 - Borrowers' requirements-architectural services.
Code of Federal Regulations, 2014 CFR
2014-01-01
... UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN.... The provisions of this section apply to all borrower electric system facilities regardless of the... under subpart E of this part, and, as applicable, those duties assigned to the “engineer” for...
7 CFR 1724.20 - Borrowers' requirements-architectural services.
Code of Federal Regulations, 2010 CFR
2010-01-01
... UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN.... The provisions of this section apply to all borrower electric system facilities regardless of the... under subpart E of this part, and, as applicable, those duties assigned to the “engineer” for...
7 CFR 1724.20 - Borrowers' requirements-architectural services.
Code of Federal Regulations, 2011 CFR
2011-01-01
... UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN.... The provisions of this section apply to all borrower electric system facilities regardless of the... under subpart E of this part, and, as applicable, those duties assigned to the “engineer” for...
7 CFR 1724.20 - Borrowers' requirements-architectural services.
Code of Federal Regulations, 2012 CFR
2012-01-01
... UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN.... The provisions of this section apply to all borrower electric system facilities regardless of the... under subpart E of this part, and, as applicable, those duties assigned to the “engineer” for...
7 CFR 1724.20 - Borrowers' requirements-architectural services.
Code of Federal Regulations, 2013 CFR
2013-01-01
... UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN.... The provisions of this section apply to all borrower electric system facilities regardless of the... under subpart E of this part, and, as applicable, those duties assigned to the “engineer” for...
46 CFR 111.33-5 - Installation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...
Water Use in the US Electric Power Sector: Energy Systems ...
This presentation reviews the water demands of long-range electricity scenarios. It addresses questions such as: What are the aggregate water requirements of the U.S. electric power sector? How could water requirements evolve under different long-range regional generation mixes? It also looks at research addressing the electricity generation water demand from a life cycle perspective, such as water use for the fuel cycle (natural gas, coal, uranium, etc.) and water use for the materials/equipment/manufacturing of new power plants. The presentation is part of panel session on the Water-Energy Nexus at the World Energy Engineering Congress
NASA Technical Reports Server (NTRS)
Rigo, H. S.; Bercaw, R. W.; Burkhart, J. A.; Mroz, T. S.; Bents, D. J.; Hatch, A. M.
1981-01-01
A description and the design requirements for the 200 MWe (nominal) net output MHD Engineering Test Facility (ETF) Conceptual Design, are presented. Performance requirements for the plant are identified and process conditions are indicated at interface stations between the major systems comprising the plant. Also included are the description, functions, interfaces and requirements for each of these major systems. The lastest information (1980-1981) from the MHD technology program are integrated with elements of a conventional steam electric power generating plant.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-14
... installing software version 8.2.Q1 to the engine electronic control unit (ECU), which increases the engine's... proposed AD would require the removal of the affected ECUs from service. We are proposing this AD to... software version 8.2.Q1 to the ECU, which increases the engine's margin to flameout. That AD was prompted...
Pratt & Whitney ESCORT derivative for mars surface power
NASA Astrophysics Data System (ADS)
Feller, Gerald J.; Joyner, Russell
1999-01-01
The purpose of this paper is to address the applicability of a common reactor system design from the Pratt & Whitney ESCORT nuclear thermal rocket engine concept to support current NASA mars surface-based power requirements. The ESCORT is a bimodal engine capable of supporting a wide range of propulsive thermal and vehicle electrical power requirements. The ESCORT engine is powered by a fast-spectrum beryllium-reflected CERMET-fueled nuclear reactor. In addition to an expander cycle propulsive mode, the ESCORT is capable of operating in an electrical power mode. In this mode, the reactor is used to heat a mixture of helium and xenon to drive a closed-loop Brayton cycle in order to generate electrical energy. Recent Design Reference Mission requirements (DRM) from NASA Johnson Space Center and NASA Lewis Research Center studies in 1997 and 1998 have detailed upgraded requirements for potential mars transfer missions. The current NASA DRM requires a nuclear thermal propulsion system capable of delivering total mission requirements of 200170 N (45000 lbf) thrust and 50 kWe of spacecraft electrical power. Additionally, these requirements detailed a surface power system capable of providing approximately 160 kW of electrical energy over an approximate 10 year period within a given weight and volume envelope. Current NASA studies use a SP-100 reactor (0.8 MT) and a NERVA derivative (1.6 MT) as baseline systems. A mobile power cart of approximate dimensions 1.7 m×4.5 m×4.4 m has been conceptualized to transport the reactor power system on the Mars Surface. The 63.25 cm diameter and 80.25 cm height of the ESCORT and its 1.3 MT of weight fit well within the current weight and volume target range of the NASA DRM requirements. The modifications required to the ESCORT reactor system to support this upgraded electrical power requirements along with operation in the Martian atmospheric conditions are addressed in this paper. Sufficient excess reactivity and burnup capability were designed into the ESCORT reactor system to support these upgraded requirements. Only slight modifications to reactor hardware were required to address any environmental considerations. These modifications involved sealing any refractory metal alloy components from the CO2 in the Martian Atmosphere. Also, the Brayton cycle Power Conversion Unit (PCU) hardware was modified to support the upgraded requirements. This paper discusses the design analysis performed and provides information on the final common reactor concept to be used on the Mars surface to support manned missions.
UAV Mission Optimization through Hybrid-Electric Propulsion
NASA Astrophysics Data System (ADS)
Blackwelder, Philip Scott
Hybrid-electric powertrain leverages the superior range of petrol based systems with the quiet and emission free benefits of electric propulsion. The major caveat to hybrid-electric powertrain in an airplane is that it is inherently heavier than conventional petroleum powertrain due mostly to the low energy density of battery technology. The first goal of this research is to develop mission planning code to match powertrain components for a small-scale unmanned aerial vehicle (UAV) to complete a standard surveillance mission within a set of user input parameters. The second goal is to promote low acoustic profile loitering through mid-flight engine starting. The two means by which midmission engine starting will be addressed is through reverse thrust from the propeller and a servo actuated gear to couple and decouple the engine and motor. The mission planning code calculates the power required to complete a mission and assists the user in sourcing powertrain components including the propeller, motor, battery, motor controller, engine and fuel. Reverse thrust engine starting involves characterizing an off the shelf variable pitch propeller and using its torque coefficient to calculate the advance ratio required to provide sufficient torque and speed to start an engine. Geared engine starting works like the starter in a conventional automobile. A servo actuated gear will couple the motor to the engine to start it and decouple once the engine has started. Reverse thrust engine starting was unsuccessful due to limitations of available off the shelf variable pitch propellers. However, reverse thrust engine starting could be realized through a custom larger diameter propeller. Geared engine starting was a success, though the system was unable to run fully as intended. Due to counter-clockwise crank rotation of the engine and the right-hand threads on the crankshaft, cranking the engine resulted in the nut securing the engine starter gear to back off as the engine cranked. A second nut was added to secure the starter gear but at the expense of removing the engine drive pulley. Removing the engine pulley meant that the starter gear must remain engaged to transmit torque to the propeller shaft as opposed to the engine pulley. This issue can be resolved using different hardware, however changing the mounting hardware would require additional modifications to the associated component which time would not permit. Though battery technology still proves to be the main constraint of electrified powertrain, careful design and mission planning can help minimize the weight penalties incurred. The mission planning code complements previous research by comparing the weight penalties of a blended climb versus an engine only climb and selecting the lightest option. Though reverse thrust engine starting proved unsuccessful, the success of geared engine starting now allows the engine to be shut off during loiter reducing both acoustic profile and fuel consumption during loiter.
46 CFR 111.10-9 - Ship's service supply transformers; two required.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Ship's service supply transformers; two required. 111.10... ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Supply § 111.10-9 Ship's service supply transformers; two required. If transformers are used to supply the ship's service distribution system required by...
46 CFR 111.10-9 - Ship's service supply transformers; two required.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Ship's service supply transformers; two required. 111.10... ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Supply § 111.10-9 Ship's service supply transformers; two required. If transformers are used to supply the ship's service distribution system required by...
46 CFR 111.10-9 - Ship's service supply transformers; two required.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Ship's service supply transformers; two required. 111.10... ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Supply § 111.10-9 Ship's service supply transformers; two required. If transformers are used to supply the ship's service distribution system required by...
46 CFR 111.10-9 - Ship's service supply transformers; two required.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Ship's service supply transformers; two required. 111.10... ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Supply § 111.10-9 Ship's service supply transformers; two required. If transformers are used to supply the ship's service distribution system required by...
46 CFR 111.10-9 - Ship's service supply transformers; two required.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Ship's service supply transformers; two required. 111.10... ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Supply § 111.10-9 Ship's service supply transformers; two required. If transformers are used to supply the ship's service distribution system required by...
Code of Federal Regulations, 2013 CFR
2013-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having an Automatic Starting Diesel Engine or Gas Turbine Driven Emergency Power Source as the Sole Emergency Power Source § 112.25-1 General. This subpart contains requirements applicable to...
Code of Federal Regulations, 2014 CFR
2014-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having an Automatic Starting Diesel Engine or Gas Turbine Driven Emergency Power Source as the Sole Emergency Power Source § 112.25-1 General. This subpart contains requirements applicable to...
Code of Federal Regulations, 2010 CFR
2010-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having an Automatic Starting Diesel Engine or Gas Turbine Driven Emergency Power Source as the Sole Emergency Power Source § 112.25-1 General. This subpart contains requirements applicable to...
Code of Federal Regulations, 2011 CFR
2011-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having an Automatic Starting Diesel Engine or Gas Turbine Driven Emergency Power Source as the Sole Emergency Power Source § 112.25-1 General. This subpart contains requirements applicable to...
Code of Federal Regulations, 2012 CFR
2012-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having an Automatic Starting Diesel Engine or Gas Turbine Driven Emergency Power Source as the Sole Emergency Power Source § 112.25-1 General. This subpart contains requirements applicable to...
ERIC Educational Resources Information Center
Welch, Karla Conn; Hieb, Jeffrey; Graham, James
2015-01-01
Coursework that instills patterns of rigorous logical thought has long been a hallmark of the engineering curriculum. However, today's engineering students are expected to exhibit a wider range of thinking capabilities both to satisfy ABET requirements and to prepare the students to become successful practitioners. This paper presents the initial…
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Enclosures. 111.50-7 Section 111.50-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-7 Enclosures. (a) Each enclosure of an overcurrent protective...
46 CFR 111.79-15 - Receptacles for refrigerated containers.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Receptacles for refrigerated containers. 111.79-15 Section 111.79-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Receptacles § 111.79-15 Receptacles for refrigerated containers...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Enclosure. 111.40-5 Section 111.40-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Panelboards § 111.40-5 Enclosure. Each panelboard must have a noncombustible enclosure that meets...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Excitation. 111.12-3 Section 111.12-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-3 Excitation. In general, excitation must meet...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Enclosure. 111.40-5 Section 111.40-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Panelboards § 111.40-5 Enclosure. Each panelboard must have a noncombustible enclosure that meets...
46 CFR 111.50-9 - Disconnecting and guarding.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Disconnecting and guarding. 111.50-9 Section 111.50-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-9 Disconnecting and guarding. Disconnecting and...
46 CFR 111.50-9 - Disconnecting and guarding.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Disconnecting and guarding. 111.50-9 Section 111.50-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-9 Disconnecting and guarding. Disconnecting and...
46 CFR 111.50-9 - Disconnecting and guarding.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Disconnecting and guarding. 111.50-9 Section 111.50-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-9 Disconnecting and guarding. Disconnecting and...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Enclosures. 111.50-7 Section 111.50-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-7 Enclosures. (a) Each enclosure of an overcurrent protective...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Enclosure. 111.40-5 Section 111.40-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Panelboards § 111.40-5 Enclosure. Each panelboard must have a noncombustible enclosure that meets...
46 CFR 111.79-15 - Receptacles for refrigerated containers.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Receptacles for refrigerated containers. 111.79-15 Section 111.79-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Receptacles § 111.79-15 Receptacles for refrigerated containers...
46 CFR 111.79-15 - Receptacles for refrigerated containers.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Receptacles for refrigerated containers. 111.79-15 Section 111.79-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Receptacles § 111.79-15 Receptacles for refrigerated containers...
46 CFR 111.50-9 - Disconnecting and guarding.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Disconnecting and guarding. 111.50-9 Section 111.50-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-9 Disconnecting and guarding. Disconnecting and...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Enclosure. 111.40-5 Section 111.40-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Panelboards § 111.40-5 Enclosure. Each panelboard must have a noncombustible enclosure that meets...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Enclosures. 111.50-7 Section 111.50-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-7 Enclosures. (a) Each enclosure of an overcurrent protective...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Enclosure. 111.40-5 Section 111.40-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Panelboards § 111.40-5 Enclosure. Each panelboard must have a noncombustible enclosure that meets...
46 CFR 111.79-15 - Receptacles for refrigerated containers.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Receptacles for refrigerated containers. 111.79-15 Section 111.79-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Receptacles § 111.79-15 Receptacles for refrigerated containers...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Excitation. 111.12-3 Section 111.12-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-3 Excitation. In general, excitation must meet...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Enclosures. 111.50-7 Section 111.50-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-7 Enclosures. (a) Each enclosure of an overcurrent protective...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Excitation. 111.12-3 Section 111.12-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-3 Excitation. In general, excitation must meet...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Excitation. 111.12-3 Section 111.12-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-3 Excitation. In general, excitation must meet...
46 CFR 111.30-29 - Emergency switchboards.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Emergency switchboards. 111.30-29 Section 111.30-29 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-29 Emergency switchboards. (a) Each emergency generator must...
46 CFR 111.12-13 - Propulsion generator protection.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Propulsion generator protection. 111.12-13 Section 111.12-13 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-13 Propulsion generator...
46 CFR 111.12-13 - Propulsion generator protection.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Propulsion generator protection. 111.12-13 Section 111.12-13 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-13 Propulsion generator...
46 CFR 111.12-13 - Propulsion generator protection.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Propulsion generator protection. 111.12-13 Section 111.12-13 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-13 Propulsion generator...
46 CFR 111.12-13 - Propulsion generator protection.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Propulsion generator protection. 111.12-13 Section 111.12-13 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-13 Propulsion generator...
46 CFR 111.12-13 - Propulsion generator protection.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Propulsion generator protection. 111.12-13 Section 111.12-13 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-13 Propulsion generator...
46 CFR 111.75-20 - Lighting fixtures.
Code of Federal Regulations, 2010 CFR
2010-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Lighting Circuits and Protection § 111.75-20 Lighting fixtures. (a) The construction of each... connection box for a circuit other than the branch circuit supplying the fixture. (d) Lighting fixtures must...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false General. 111.15-1 Section 111.15-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-1 General. Each battery...
46 CFR 111.105-1 - Applicability; definition.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Applicability; definition. 111.105-1 Section 111.105-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-1 Applicability; definition. This subpart applies to...
46 CFR 111.101-1 - Applicability.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Applicability. 111.101-1 Section 111.101-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Submersible Motor-Driven Bilge Pumps § 111.101-1 Applicability. This subpart applies to each...
Code of Federal Regulations, 2014 CFR
2014-10-01
... HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous... cargoes. (a) This section applies to locations surrounding the storage and handling of combustible liquid... hazardous locations in § 111.106-9 of this subpart apply. ...
46 CFR 111.101-1 - Applicability.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Applicability. 111.101-1 Section 111.101-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Submersible Motor-Driven Bilge Pumps § 111.101-1 Applicability. This subpart applies to each...
46 CFR 111.101-1 - Applicability.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Applicability. 111.101-1 Section 111.101-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Submersible Motor-Driven Bilge Pumps § 111.101-1 Applicability. This subpart applies to each...
46 CFR 111.101-1 - Applicability.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Applicability. 111.101-1 Section 111.101-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Submersible Motor-Driven Bilge Pumps § 111.101-1 Applicability. This subpart applies to each...
46 CFR 111.101-1 - Applicability.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Applicability. 111.101-1 Section 111.101-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Submersible Motor-Driven Bilge Pumps § 111.101-1 Applicability. This subpart applies to each...
46 CFR 111.105-1 - Applicability; definition.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Applicability; definition. 111.105-1 Section 111.105-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-1 Applicability; definition. This subpart applies to...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false General. 111.15-1 Section 111.15-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-1 General. Each battery...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false General. 111.15-1 Section 111.15-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-1 General. Each battery...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false General. 111.15-1 Section 111.15-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-1 General. Each battery...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false General. 111.15-1 Section 111.15-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-1 General. Each battery...
NASA Glenn Research Center Program in High Power Density Motors for Aeropropulsion
NASA Technical Reports Server (NTRS)
Brown, Gerald V.; Kascak, Albert F.; Ebihara, Ben; Johnson, Dexter; Choi, Benjamin; Siebert, Mark; Buccieri, Carl
2005-01-01
Electric drive of transport-sized aircraft propulsors, with electric power generated by fuel cells or turbo-generators, will require electric motors with much higher power density than conventional room-temperature machines. Cryogenic cooling of the motor windings by the liquid hydrogen fuel offers a possible solution, enabling motors with higher power density than turbine engines. Some context on weights of various systems, which is required to assess the problem, is presented. This context includes a survey of turbine engine weights over a considerable size range, a correlation of gear box weights and some examples of conventional and advanced electric motor weights. The NASA Glenn Research Center program for high power density motors is outlined and some technical results to date are presented. These results include current densities of 5,000 A per square centimeter current density achieved in cryogenic coils, finite element predictions compared to measurements of torque production in a switched reluctance motor, and initial tests of a cryogenic switched reluctance motor.
Advanced radioisotope heat source for Stirling Engines
NASA Astrophysics Data System (ADS)
Dobry, T. J.; Walberg, G.
2001-02-01
The heat exchanger on a Stirling Engine requires a thermal energy transfer from a heat source to the engine through a very limited area on the heater head circumference. Designing an effective means to assure maximum transfer efficiency is challenging. A single General Purpose Heat Source (GPHS), which has been qualified for space operations, would satisfy thermal requirements for a single Stirling Engine that would produce 55 electrical watts. However, it is not efficient to transfer its thermal energy to the engine heat exchanger from its rectangular geometry. This paper describes a conceptual design of a heat source to improve energy transfer for Stirling Engines that may be deployed to power instrumentation on space missions. .
Applicability of advanced automotive heat engines to solar thermal power
NASA Technical Reports Server (NTRS)
Beremand, D. G.; Evans, D. G.; Alger, D. L.
1981-01-01
The requirements of a solar thermal power system are reviewed and compared with the predicted characteristics of automobile engines under development. A good match is found in terms of power level and efficiency when the automobile engines, designed for maximum powers of 65-100 kW (87 to 133 hp) are operated to the nominal 20-40 kW electric output requirement of the solar thermal application. At these reduced power levels it appears that the automotive gas turbine and Stirling engines have the potential to deliver the 40+ percent efficiency goal of the solar thermal program.
Applicability of advanced automotive heat engines to solar thermal power
NASA Astrophysics Data System (ADS)
Beremand, D. G.; Evans, D. G.; Alger, D. L.
The requirements of a solar thermal power system are reviewed and compared with the predicted characteristics of automobile engines under development. A good match is found in terms of power level and efficiency when the automobile engines, designed for maximum powers of 65-100 kW (87 to 133 hp) are operated to the nominal 20-40 kW electric output requirement of the solar thermal application. At these reduced power levels it appears that the automotive gas turbine and Stirling engines have the potential to deliver the 40+ percent efficiency goal of the solar thermal program.
NASA Technical Reports Server (NTRS)
1979-01-01
The preliminary design for a prototype small (20 kWe) solar thermal electric generating unit was completed, consisting of several subsystems. The concentrator and the receiver collect solar energy and a thermal buffer storage with a transport system is used to provide a partially smoothed heat input to the Stirling engine. A fossil-fuel combustor is included in the receiver designs to permit operation with partial or no solar insolation (hybrid). The engine converts the heat input into mechanical action that powers a generator. To obtain electric power on a large scale, multiple solar modules will be required to operate in parallel. The small solar electric power plant used as a baseline design will provide electricity at remote sites and small communities.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-04
[email protected]ge.com . You may review copies of the referenced service information at the FAA, Engine..., February 26, 2009), for GE CF6-45 and CF6-50 series turbofan engines. That AD requires replacing LFCEN... that this proposed AD would affect 383 GE CF6-45 and CF6-50 series turbofan engines installed on...
46 CFR 111.33-3 - Nameplate data.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Nameplate data. 111.33-3 Section 111.33-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-3 Nameplate data. (a) Each semiconductor rectifier...
46 CFR 111.79-9 - Transmitting power between receptacles.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Transmitting power between receptacles. 111.79-9 Section 111.79-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Receptacles § 111.79-9 Transmitting power between receptacles. (a) If...
46 CFR 111.30-1 - Location and installation.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Location and installation. 111.30-1 Section 111.30-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-1 Location and installation. Each switchboard must meet the...
46 CFR 111.30-5 - Construction.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Construction. 111.30-5 Section 111.30-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-5 Construction. (a) All low voltage and medium voltage switchboards (as low...
46 CFR 111.79-9 - Transmitting power between receptacles.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Transmitting power between receptacles. 111.79-9 Section 111.79-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Receptacles § 111.79-9 Transmitting power between receptacles. (a) If...
46 CFR 111.30-5 - Construction.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Construction. 111.30-5 Section 111.30-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-5 Construction. (a) All low voltage and medium voltage switchboards (as low...
46 CFR 111.30-5 - Construction.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Construction. 111.30-5 Section 111.30-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-5 Construction. (a) All low voltage and medium voltage switchboards (as low...
46 CFR 111.12-9 - Generator cables.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Generator cables. 111.12-9 Section 111.12-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-9 Generator cables. (a) The current-carrying capacity...
46 CFR 111.79-9 - Transmitting power between receptacles.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Transmitting power between receptacles. 111.79-9 Section 111.79-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Receptacles § 111.79-9 Transmitting power between receptacles. (a) If...
46 CFR 111.30-25 - Alternating-current ship's service switchboards.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Alternating-current ship's service switchboards. 111.30-25 Section 111.30-25 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-25 Alternating-current ship's service...
46 CFR 111.30-11 - Deck coverings.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Deck coverings. 111.30-11 Section 111.30-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-11 Deck coverings. Non-conducting deck coverings, such as non-conducting...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false General. 111.33-1 Section 111.33-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-1 General. This subpart is applicable to all power...
46 CFR 111.12-9 - Generator cables.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Generator cables. 111.12-9 Section 111.12-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-9 Generator cables. (a) The current-carrying capacity...
46 CFR 111.30-11 - Deck coverings.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Deck coverings. 111.30-11 Section 111.30-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-11 Deck coverings. Non-conducting deck coverings, such as non-conducting...
46 CFR 111.30-1 - Location and installation.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Location and installation. 111.30-1 Section 111.30-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-1 Location and installation. Each switchboard must meet the...
46 CFR 111.30-1 - Location and installation.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Location and installation. 111.30-1 Section 111.30-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-1 Location and installation. Each switchboard must meet the...
46 CFR 111.30-11 - Deck coverings.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Deck coverings. 111.30-11 Section 111.30-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-11 Deck coverings. Non-conducting deck coverings, such as non-conducting...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false General. 111.33-1 Section 111.33-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-1 General. This subpart is applicable to all power...
46 CFR 111.30-11 - Deck coverings.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Deck coverings. 111.30-11 Section 111.30-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-11 Deck coverings. Non-conducting deck coverings, such as non-conducting...
46 CFR 111.30-1 - Location and installation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Location and installation. 111.30-1 Section 111.30-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-1 Location and installation. Each switchboard must meet the...
46 CFR 111.30-1 - Location and installation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Location and installation. 111.30-1 Section 111.30-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-1 Location and installation. Each switchboard must meet the...
46 CFR 111.30-5 - Construction.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Construction. 111.30-5 Section 111.30-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-5 Construction. (a) All low voltage and medium voltage switchboards (as low...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false General. 111.33-1 Section 111.33-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-1 General. This subpart is applicable to all power...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false General. 111.33-1 Section 111.33-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-1 General. This subpart is applicable to all power...
46 CFR 111.33-3 - Nameplate data.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Nameplate data. 111.33-3 Section 111.33-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-3 Nameplate data. (a) Each semiconductor rectifier...
46 CFR 111.79-9 - Transmitting power between receptacles.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Transmitting power between receptacles. 111.79-9 Section 111.79-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Receptacles § 111.79-9 Transmitting power between receptacles. (a) If...
46 CFR 111.79-9 - Transmitting power between receptacles.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Transmitting power between receptacles. 111.79-9 Section 111.79-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Receptacles § 111.79-9 Transmitting power between receptacles. (a) If...
46 CFR 111.12-9 - Generator cables.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Generator cables. 111.12-9 Section 111.12-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-9 Generator cables. (a) The current-carrying capacity...
46 CFR 111.30-11 - Deck coverings.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Deck coverings. 111.30-11 Section 111.30-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-11 Deck coverings. Non-conducting deck coverings, such as non-conducting...
46 CFR 111.12-9 - Generator cables.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Generator cables. 111.12-9 Section 111.12-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-9 Generator cables. (a) The current-carrying capacity...
46 CFR 111.30-5 - Construction.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Construction. 111.30-5 Section 111.30-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-5 Construction. (a) All low voltage and medium voltage switchboards (as low...
46 CFR 111.33-3 - Nameplate data.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Nameplate data. 111.33-3 Section 111.33-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-3 Nameplate data. (a) Each semiconductor rectifier...
46 CFR 111.30-25 - Alternating-current ship's service switchboards.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Alternating-current ship's service switchboards. 111.30-25 Section 111.30-25 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-25 Alternating-current ship's service...
46 CFR 111.30-25 - Alternating-current ship's service switchboards.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Alternating-current ship's service switchboards. 111.30-25 Section 111.30-25 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-25 Alternating-current ship's service...
46 CFR 111.105-15 - Additional methods of protection.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Additional methods of protection. 111.105-15 Section 111.105-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-15 Additional methods of protection...
46 CFR 111.105-5 - System integrity.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false System integrity. 111.105-5 Section 111.105-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-5 System integrity. In order to maintain system integrity, each...
46 CFR 111.105-5 - System integrity.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false System integrity. 111.105-5 Section 111.105-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-5 System integrity. In order to maintain system integrity, each...
46 CFR 111.05-25 - Ungrounded systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Ungrounded systems. 111.05-25 Section 111.05-25 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Equipment Ground, Ground Detection, and Grounded Systems § 111.05-25 Ungrounded systems. Each...
46 CFR 111.05-25 - Ungrounded systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Ungrounded systems. 111.05-25 Section 111.05-25 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Equipment Ground, Ground Detection, and Grounded Systems § 111.05-25 Ungrounded systems. Each...
46 CFR 111.105-5 - System integrity.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false System integrity. 111.105-5 Section 111.105-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-5 System integrity. In order to maintain system integrity, each...
46 CFR 111.05-25 - Ungrounded systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Ungrounded systems. 111.05-25 Section 111.05-25 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Equipment Ground, Ground Detection, and Grounded Systems § 111.05-25 Ungrounded systems. Each...
46 CFR 111.75-1 - Lighting feeders.
Code of Federal Regulations, 2010 CFR
2010-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Lighting Circuits and Protection § 111.75-1 Lighting feeders. (a) Passenger vessels. On a... lighting, feeders, and branch circuits are in subpart 112.43 of this chapter. [CGD 74-125A, 47 FR 15236...
7 CFR 1717.608 - RUS approval of contracts.
Code of Federal Regulations, 2014 CFR
2014-01-01
... engineering services, and in 7 CFR part 1726 for construction and procurement. (b) Large retail power contracts. RUS approval of contracts to sell electric power to retail customers is required only if the... AGRICULTURE POST-LOAN POLICIES AND PROCEDURES COMMON TO INSURED AND GUARANTEED ELECTRIC LOANS Operational...
46 CFR 111.05-17 - Generation and distribution system grounding.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Section 111.05-17 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Equipment Ground, Ground Detection, and Grounded Systems § 111.05-17... must: (a) Be grounded at the generator switchboard, except the neutral of an emergency power generation...
46 CFR 111.75-16 - Lighting of survival craft and rescue boats.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Section 111.75-16 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Lighting Circuits and Protection § 111.75-16 Lighting of survival... be adequately illuminated by lighting supplied from the emergency power source. (b) The arrangement...
7 CFR 1717.608 - RUS approval of contracts.
Code of Federal Regulations, 2013 CFR
2013-01-01
... engineering services, and in 7 CFR part 1726 for construction and procurement. (b) Large retail power contracts. RUS approval of contracts to sell electric power to retail customers is required only if the... AGRICULTURE POST-LOAN POLICIES AND PROCEDURES COMMON TO INSURED AND GUARANTEED ELECTRIC LOANS Operational...
7 CFR 1717.608 - RUS approval of contracts.
Code of Federal Regulations, 2012 CFR
2012-01-01
... engineering services, and in 7 CFR part 1726 for construction and procurement. (b) Large retail power contracts. RUS approval of contracts to sell electric power to retail customers is required only if the... AGRICULTURE POST-LOAN POLICIES AND PROCEDURES COMMON TO INSURED AND GUARANTEED ELECTRIC LOANS Operational...
46 CFR 111.05-17 - Generation and distribution system grounding.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Section 111.05-17 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Equipment Ground, Ground Detection, and Grounded Systems § 111.05-17... must: (a) Be grounded at the generator switchboard, except the neutral of an emergency power generation...
46 CFR 111.05-17 - Generation and distribution system grounding.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Section 111.05-17 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Equipment Ground, Ground Detection, and Grounded Systems § 111.05-17... must: (a) Be grounded at the generator switchboard, except the neutral of an emergency power generation...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Switches. 111.105-19 Section 111.105-19 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-19 Switches. A switch that is explosionproof or flameproof, or that...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Switches. 111.105-19 Section 111.105-19 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-19 Switches. A switch that is explosionproof or flameproof, or that...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Switches. 111.105-19 Section 111.105-19 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-19 Switches. A switch that is explosionproof or flameproof, or that...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Switches. 111.105-19 Section 111.105-19 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-19 Switches. A switch that is explosionproof or flameproof, or that...
ERIC Educational Resources Information Center
Illinois Univ., Urbana. Coll. of Agriculture.
BETWEEN 2 AND 8 HOURS ARE REQUIRED FOR USE OF THIS TEXTUAL OR REFERENCE MATERIAL ON ELECTRIC MOTORS. IT WAS DEVELOPED BY AN AGRICULTURAL EDUCATION-AGRICULTURAL ENGINEERING SPECIALIST ON THE BASIS OF CONFERENCES WITH SUBJECT MATTER SPECIALISTS, TEACHER EDUCATORS, SUPERVISORS, AND TEACHERS. THE OBJECTIVES AND SUBJECT MATTER CENTER AROUND THE…
46 CFR 111.54-3 - Remote control.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Remote control. 111.54-3 Section 111.54-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Circuit Breakers § 111.54-3 Remote control. Remotely controlled circuit breakers must have local...
46 CFR 111.54-3 - Remote control.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Remote control. 111.54-3 Section 111.54-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Circuit Breakers § 111.54-3 Remote control. Remotely controlled circuit breakers must have local...
46 CFR 111.54-3 - Remote control.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Remote control. 111.54-3 Section 111.54-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Circuit Breakers § 111.54-3 Remote control. Remotely controlled circuit breakers must have local...
46 CFR 111.54-3 - Remote control.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Remote control. 111.54-3 Section 111.54-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Circuit Breakers § 111.54-3 Remote control. Remotely controlled circuit breakers must have local...
46 CFR 111.54-3 - Remote control.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Remote control. 111.54-3 Section 111.54-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Circuit Breakers § 111.54-3 Remote control. Remotely controlled circuit breakers must have local...
46 CFR 111.99-1 - Applicability.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Applicability. 111.99-1 Section 111.99-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Fire Door Holding and Release Systems § 111.99-1 Applicability. This subpart applies to fire door...
46 CFR 111.99-1 - Applicability.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Applicability. 111.99-1 Section 111.99-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Fire Door Holding and Release Systems § 111.99-1 Applicability. This subpart applies to fire door...
46 CFR 111.99-1 - Applicability.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Applicability. 111.99-1 Section 111.99-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Fire Door Holding and Release Systems § 111.99-1 Applicability. This subpart applies to fire door...