Sample records for electrical installation including

  1. 29 CFR 1926.402 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... installations used for the generation, transmission, and distribution of electric energy, including related...) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Electrical Installation Safety Requirements § 1926.402... electrical equipment and installations used to provide electric power and light at the jobsite. These...

  2. 29 CFR 1926.402 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... installations used for the generation, transmission, and distribution of electric energy, including related...) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Electrical Installation Safety Requirements § 1926.402... electrical equipment and installations used to provide electric power and light at the jobsite. These...

  3. 30 CFR 250.1628 - Design, installation, and operation of production systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... mechanical and electrical systems to be installed was approved by registered professional engineers. After... Installation of Offshore Production Platform Piping Systems; (3) Electrical system information including a plan... Practice for Classification of Locations for Electrical Installations at Petroleum Facilities Classified as...

  4. 30 CFR 75.1710-1 - Canopies or cabs; self-propelled diesel-powered and electric face equipment; installation...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... and electric face equipment; installation requirements. (a) Except as provided in paragraph (f) of this section, all self-propelled diesel-powered and electric face equipment, including shuttle cars... and electric face equipment; installation requirements. 75.1710-1 Section 75.1710-1 Mineral Resources...

  5. 30 CFR 75.1710-1 - Canopies or cabs; self-propelled diesel-powered and electric face equipment; installation...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... and electric face equipment; installation requirements. (a) Except as provided in paragraph (f) of this section, all self-propelled diesel-powered and electric face equipment, including shuttle cars... and electric face equipment; installation requirements. 75.1710-1 Section 75.1710-1 Mineral Resources...

  6. 30 CFR 75.1710-1 - Canopies or cabs; self-propelled diesel-powered and electric face equipment; installation...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... and electric face equipment; installation requirements. (a) Except as provided in paragraph (f) of this section, all self-propelled diesel-powered and electric face equipment, including shuttle cars... and electric face equipment; installation requirements. 75.1710-1 Section 75.1710-1 Mineral Resources...

  7. 30 CFR 75.1710-1 - Canopies or cabs; self-propelled diesel-powered and electric face equipment; installation...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... and electric face equipment; installation requirements. (a) Except as provided in paragraph (f) of this section, all self-propelled diesel-powered and electric face equipment, including shuttle cars... and electric face equipment; installation requirements. 75.1710-1 Section 75.1710-1 Mineral Resources...

  8. 30 CFR 75.1710-1 - Canopies or cabs; self-propelled diesel-powered and electric face equipment; installation...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... and electric face equipment; installation requirements. (a) Except as provided in paragraph (f) of this section, all self-propelled diesel-powered and electric face equipment, including shuttle cars... and electric face equipment; installation requirements. 75.1710-1 Section 75.1710-1 Mineral Resources...

  9. 30 CFR 250.1628 - Design, installation, and operation of production systems.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Systems; (3) Electrical system information including a plan of each platform deck, outlining all hazardous... Electrical Installations at Petroleum Facilities Classified as Class I, Division 1 and Division 2, or API RP 505, Recommended Practice for Classification of Locations for Electrical Installations at Petroleum...

  10. 30 CFR 250.1628 - Design, installation, and operation of production systems.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Systems (as incorporated by reference in § 250.198); (3) Electrical system information including a plan of... Practice for Classification of Locations for Electrical Installations at Petroleum Facilities Classified as... for Electrical Installations at Petroleum Facilities Classified as Class I, Zone 0, Zone 1, and Zone 2...

  11. 30 CFR 250.802 - Design, installation, and operation of surface production-safety systems.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... and electrical systems to be installed were approved by registered professional engineers. After these... reference as specified in § 250.198). (4) Electrical system information including the following: (i) A plan... Practice for Classification of Locations for Electrical Installations at Petroleum Facilities Classified as...

  12. 30 CFR 250.1628 - Design, installation, and operation of production systems.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Systems (as incorporated by reference in § 250.198); (3) Electrical system information including a plan of... Practice for Classification of Locations for Electrical Installations at Petroleum Facilities Classified as... for Electrical Installations at Petroleum Facilities Classified as Class I, Zone 0, Zone 1, and Zone 2...

  13. 30 CFR 250.1628 - Design, installation, and operation of production systems.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Systems (as incorporated by reference in § 250.198); (3) Electrical system information including a plan of... Practice for Classification of Locations for Electrical Installations at Petroleum Facilities Classified as... for Electrical Installations at Petroleum Facilities Classified as Class I, Zone 0, Zone 1, and Zone 2...

  14. 29 CFR 1926.402 - Applicability.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... subpart V of this part for the construction of power distribution and transmission lines. ... electrical equipment and installations used to provide electric power and light at the jobsite. These... installations used for the generation, transmission, and distribution of electric energy, including related...

  15. 29 CFR 1926.402 - Applicability.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... subpart V of this part for the construction of power distribution and transmission lines. ... electrical equipment and installations used to provide electric power and light at the jobsite. These... installations used for the generation, transmission, and distribution of electric energy, including related...

  16. Integrated science building

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Conklin, Shane

    2013-09-30

    Shell space fit out included faculty office advising space, student study space, staff restroom and lobby cafe. Electrical, HVAC and fire alarm installations and upgrades to existing systems were required to support the newly configured spaces. These installations and upgrades included audio/visual equipment, additional electrical outlets and connections to emergency generators. The project provided increased chilled water capacity with the addition of an electric centrifugal chiller. Upgrades associated with chiller included upgrade of exhaust ventilation fan, electrical conductor and breaker upgrades, piping and upgrades to air handling equipment.

  17. Practical aspects of instrumentation system installation, volume 13

    NASA Technical Reports Server (NTRS)

    Borek, R. W.; Pool, A. (Editor); Sanderson, K. C. (Editor)

    1981-01-01

    A review of factors influencing installation of aircraft flight test instrumentation is presented. Requirements, including such factors as environment, reliability, maintainability, and system safety are discussed. The assessment of the mission profile is followed by an overview of electrical and mechanical installation factors with emphasis on shock/vibration isolation systems and standardization of the electric wiring installation, two factors often overlooked by instrumentation engineers. A discussion of installation hardware reviews the performance capabilities of wiring, connectors, fuses and circuit breakers, and a guide to proper selections is provided. The discussion of the installation is primarily concerned with the electrical wire routing, shield terminations and grounding. Also inclued are some examples of installation mistakes that could affect system accuracy. System verification procedures and special considerations such as sneak circuits, pyrotechnics, aircraft antenna patterns, and lightning strikes are discussed.

  18. Coal conversion legislation. Part I. Hearings before the Subcommittee on Energy Production and Supply of the Committee on Energy and Natural Resources, United States Senate, Ninety-Fifth Congress, First Session on S. 272, S. 273, and S. 977, March 21 and 29, 1977. [Coal utilization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1977-01-01

    The legislation on greater coal utilization before the committee includes S. 272 (requiring, to the extent practicable, electric power plants and major fuel-bearing installations to utilize fuels other than natural gas); S. 273 (requiring, to the extent practicable, new electric power plants and new major fuel-burning installations be constructed to utliize fuels other than natural gas or petroleum); and S. 977 (requiring, to the extent practicable, existing electric power plants and major fuel-burning installations to utilize fuels other than natural gas or petroleum). Statements were heard from seven senators and representatives from the following: American Electric Power Service Corp., Americanmore » Boiler Manufactures Association, National Electric Reliability Council, Virgina Electric and Power Co., Fossil Power Systems, Houston Lighting and Power Co., other electric utility industry representatives, and the Federal Energy Adminstration. Additional material from the Wall Street Journal and the Washington Post is included. (MCW)« less

  19. Installation and Assembly, Electrical Ground Support Equipment (GSE), Specification for

    NASA Technical Reports Server (NTRS)

    Denson, Erik C.

    2014-01-01

    This specification covers the general workmanship requirements and procedures for the complete installation and assembly of electrical ground support equipment (EGSE) such as terminal distributors, junction boxes, conduit and fittings, cable trays and accessories, interconnecting cables (including routing requirements), motor-control equipment, and necessary hardware as specified by the applicable contract and drawings.

  20. 46 CFR 119.220 - Installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS MACHINERY INSTALLATION Propulsion... subchapter J (Electrical Engineering) of this chapter. (b) Installation of propulsion machinery of an unusual... requirements as determined necessary by the cognizant OCMI. Unusual types of propulsion machinery include: (1...

  1. 46 CFR 119.220 - Installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS MACHINERY INSTALLATION Propulsion... subchapter J (Electrical Engineering) of this chapter. (b) Installation of propulsion machinery of an unusual... requirements as determined necessary by the cognizant OCMI. Unusual types of propulsion machinery include: (1...

  2. 46 CFR 119.220 - Installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS MACHINERY INSTALLATION Propulsion... subchapter J (Electrical Engineering) of this chapter. (b) Installation of propulsion machinery of an unusual... requirements as determined necessary by the cognizant OCMI. Unusual types of propulsion machinery include: (1...

  3. 46 CFR 119.220 - Installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS MACHINERY INSTALLATION Propulsion... subchapter J (Electrical Engineering) of this chapter. (b) Installation of propulsion machinery of an unusual... requirements as determined necessary by the cognizant OCMI. Unusual types of propulsion machinery include: (1...

  4. Solar Water Heater Installation Package

    NASA Technical Reports Server (NTRS)

    1982-01-01

    A 48-page report describes water-heating system, installation (covering collector orientation, mounting, plumbing and wiring), operating instructions and maintenance procedures. Commercial solar-powered water heater system consists of a solar collector, solar-heated-water tank, electrically heated water tank and controls. Analysis of possible hazards from pressure, electricity, toxicity, flammability, gas, hot water and steam are also included.

  5. 46 CFR 111.35-1 - Electrical propulsion installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Electrical propulsion installations. 111.35-1 Section... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Propulsion § 111.35-1 Electrical propulsion installations. Each electric propulsion installation must meet sections 4-8-5/5.5, 4-8-5/5.11, 4-8-5/5.13, 4-8-5/5.17...

  6. 46 CFR 111.35-1 - Electrical propulsion installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Electrical propulsion installations. 111.35-1 Section... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Propulsion § 111.35-1 Electrical propulsion installations. Each electric propulsion installation must meet sections 4-8-5/5.5, 4-8-5/5.11, 4-8-5/5.13, 4-8-5/5.17...

  7. 46 CFR 111.35-1 - Electrical propulsion installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Electrical propulsion installations. 111.35-1 Section... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Propulsion § 111.35-1 Electrical propulsion installations. Each electric propulsion installation must meet sections 4-8-5/5.5, 4-8-5/5.11, 4-8-5/5.13, 4-8-5/5.17...

  8. 46 CFR 111.35-1 - Electrical propulsion installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Electrical propulsion installations. 111.35-1 Section... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Propulsion § 111.35-1 Electrical propulsion installations. Each electric propulsion installation must meet sections 4-8-5/5.5, 4-8-5/5.11, 4-8-5/5.13, 4-8-5/5.17...

  9. 46 CFR 111.35-1 - Electrical propulsion installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Electrical propulsion installations. 111.35-1 Section... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Propulsion § 111.35-1 Electrical propulsion installations. Each electric propulsion installation must meet sections 4-8-5/5.5, 4-8-5/5.11, 4-8-5/5.13, 4-8-5/5.17...

  10. Control and protection system for an installation for the combined production of electrical and thermal energy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Agazzone, U.; Ausiello, F.P.

    1981-06-23

    A power-generating installation comprises a plurality of modular power plants each comprised of an internal combustion engine connected to an electric machine. The electric machine is used to start the engine and thereafter operates as a generator supplying power to an electrical network common to all the modular plants. The installation has a control and protection system comprising a plurality of control modules each associated with a respective plant, and a central unit passing control signals to the modules to control starting and stopping of the individual power plants. Upon the detection of abnormal operation or failure of its associatedmore » power plant, each control module transmits an alarm signal back to the central unit which thereupon stops, or prevents the starting, of the corresponding power plant. Parameters monitored by each control module include generated current and inter-winding leakage current of the electric machine.« less

  11. 29 CFR 1910.306 - Specific purpose equipment and installations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... and multicar installations. On single-car and multicar installations, equipment receiving electrical... ADMINISTRATION, DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH STANDARDS Electrical Design Safety Standards for Electrical Systems § 1910.306 Specific purpose equipment and installations. (a) Electric signs and...

  12. 29 CFR 1910.306 - Specific purpose equipment and installations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... and multicar installations. On single-car and multicar installations, equipment receiving electrical... ADMINISTRATION, DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH STANDARDS Electrical Design Safety Standards for Electrical Systems § 1910.306 Specific purpose equipment and installations. (a) Electric signs and...

  13. 29 CFR 1910.306 - Specific purpose equipment and installations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... and multicar installations. On single-car and multicar installations, equipment receiving electrical... ADMINISTRATION, DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH STANDARDS Electrical Design Safety Standards for Electrical Systems § 1910.306 Specific purpose equipment and installations. (a) Electric signs and...

  14. Data feature: 1996 world nuclear electricity production

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-12-01

    Detailed data on electricity supplied by nuclear power reactors in 1996 are provided. Figures from the International Atomic Energy Agency indicate that a total of 32 countries worldwide were operating 441 nuclear power plants with an installed capacity of 350,411 GWe, and that 36 commercial nuclear power plant units in 14 different countries with an aggregate installed capacity of 27,928 GWe were under construction. Worldwide nuclear generated electricity increased by 3.6% from 1995 to 1996, providing 17.3% of the world`s electricity production. Data for individual countries and regional totals, including generation and consumption data by source, are provided for Westernmore » Europe, Eastern Europe, the Commonwealth of Independent States, the Far East, Canada, and the United States. Other information provided includes 1996 commercial startups, decommissioning, reactor load factors, imports and exports, and gross electricity production.« less

  15. 46 CFR 110.30-3 - Initial inspection.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS... inspections during the construction of the vessel, includes a complete inspection of the electric installation and electric equipment or apparatus. The inspection is to determine that the arrangement, materials...

  16. 46 CFR 110.30-3 - Initial inspection.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS... inspections during the construction of the vessel, includes a complete inspection of the electric installation and electric equipment or apparatus. The inspection is to determine that the arrangement, materials...

  17. 46 CFR 110.30-3 - Initial inspection.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS... inspections during the construction of the vessel, includes a complete inspection of the electric installation and electric equipment or apparatus. The inspection is to determine that the arrangement, materials...

  18. 14 CFR 29.1353 - Electrical equipment and installations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Equipment § 29.1353 Electrical equipment and installations. (a) Electrical equipment, controls, and wiring... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Electrical equipment and installations. 29... installations has shown that maintaining safe cell temperatures and pressures presents no problem. (3) No...

  19. Installation Restoration Program Records Search for Des Moines Air National Guard Installation, Iowa

    DTIC Science & Technology

    1983-09-01

    installation. Low-lying drainageways on the site are underlain by soils of the Gravity series and of the Wabash -Gravity-Nodaway complex. These soils...Shop The electric shop is located in Facility No. 100. Wastes generated from this area include nickel- -- ’ cadmium batteries (24/year) and sulfuric

  20. 46 CFR 167.40-1 - Electrical installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Electrical installations. 167.40-1 Section 167.40-1... SHIPS Certain Equipment Requirements § 167.40-1 Electrical installations. (a) Except as otherwise...) Changes or alterations in the electrical installations of vessels now in service shall be in accordance...

  1. Analysis of thermal characteristics of electrical wiring for load groups in cattle barns.

    PubMed

    Kim, Doo Hyun; Yoo, Sang-Ok; Kim, Sung Chul; Hwang, Dong Kyu

    2015-01-01

    The purpose of the current study is to analyze the thermal characteristics of electrical wirings depending on the number of operating load by connecting four types of electrical wirings that are selected by surveying the conditions for the electric fans, automatic waterers and halogen warm lamps that were installed in cattle barns in different years. The conditions of 64 cattle barns were surveyed and an experimental test was conducted at a cattle barn. The condition-survey covered inappropriate design, construction and misuse of electrical facility, including electrical wiring mostly used, and the mode of load current was evaluated. The survey showed that the mode of load current increased as the installation year of the fans, waterers and halogen lamps became older. Accordingly, the cattle barn manager needed to increase the capacity of the circuit breaker, which promoted the degradation of insulation of the electrical wires' sheath and increased possibility for electrical fires in the long-run. The test showed that the saturation temperature of the wire insulated sheath increased depending on the installation year of the load groups, in case of VCTFK and VFF electric wires, therefore, requiring their careful usage in the cattle barns.

  2. Analysis of thermal characteristics of electrical wiring for load groups in cattle barns

    PubMed Central

    KIM, Doo Hyun; YOO, Sang-Ok; KIM, Sung Chul; HWANG, Dong Kyu

    2015-01-01

    The purpose of the current study is to analyze the thermal characteristics of electrical wirings depending on the number of operating load by connecting four types of electrical wirings that are selected by surveying the conditions for the electric fans, automatic waterers and halogen warm lamps that were installed in cattle barns in different years. The conditions of 64 cattle barns were surveyed and an experimental test was conducted at a cattle barn. The condition-survey covered inappropriate design, construction and misuse of electrical facility, including electrical wiring mostly used, and the mode of load current was evaluated. The survey showed that the mode of load current increased as the installation year of the fans, waterers and halogen lamps became older. Accordingly, the cattle barn manager needed to increase the capacity of the circuit breaker, which promoted the degradation of insulation of the electrical wires’ sheath and increased possibility for electrical fires in the long-run. The test showed that the saturation temperature of the wire insulated sheath increased depending on the installation year of the load groups, in case of VCTFK and VFF electric wires, therefore, requiring their careful usage in the cattle barns. PMID:26118855

  3. 29 CFR 1926.402 - Applicability.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Electrical Installation Safety Requirements § 1926.402... electrical equipment and installations used to provide electric power and light at the jobsite. These... commenced. Note: If the electrical installation is made in accordance with the National Electrical Code ANSI...

  4. Surface electrical properties experiment, part 1. [flown on Apollo 17

    NASA Technical Reports Server (NTRS)

    Strangway, D. W.; Annan, A. P.; Redman, J. D.; Rossiter, J. R.; Rylaarsdam, J. A.; Watts, R. D.

    1974-01-01

    The work is reported which was performed on the Surface Electrical Properties Experiment Data Acquisition System. Areas discussed include: data handling and processing, installation and external signal application, operation of the equipment, and digital output. Detailed circuit descriptions are included.

  5. 14 CFR 25.1353 - Electrical equipment and installations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Electrical equipment and installations. 25... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Equipment Electrical Systems and Equipment § 25.1353 Electrical equipment and installations. (a) Electrical equipment and controls must be...

  6. 14 CFR 25.1353 - Electrical equipment and installations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Electrical equipment and installations. 25... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Equipment Electrical Systems and Equipment § 25.1353 Electrical equipment and installations. (a) Electrical equipment and controls must be...

  7. 14 CFR 25.1353 - Electrical equipment and installations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Electrical equipment and installations. 25... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Equipment Electrical Systems and Equipment § 25.1353 Electrical equipment and installations. (a) Electrical equipment and controls must be...

  8. 14 CFR 29.1353 - Electrical equipment and installations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Electrical equipment and installations. 29... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Equipment Electrical Systems and Equipment § 29.1353 Electrical equipment and installations. (a) Electrical equipment, controls, and wiring...

  9. 14 CFR 29.1353 - Electrical equipment and installations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Electrical equipment and installations. 29... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Equipment Electrical Systems and Equipment § 29.1353 Electrical equipment and installations. (a) Electrical equipment, controls, and wiring...

  10. 14 CFR 25.1353 - Electrical equipment and installations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Electrical equipment and installations. 25... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Equipment Electrical Systems and Equipment § 25.1353 Electrical equipment and installations. (a) Electrical equipment and controls must be...

  11. 14 CFR 29.1353 - Electrical equipment and installations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Electrical equipment and installations. 29... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Equipment Electrical Systems and Equipment § 29.1353 Electrical equipment and installations. (a) Electrical equipment, controls, and wiring...

  12. Deploying Electric Vehicles and Electric Vehicle Supply Equipment: Tiger Teams Offer Project Assistance for Federal Fleets

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    To assist federal agencies with the transition to plug-in electric vehicles (PEVs), including battery electric vehicles (BEVs) and plug-in hybrid electric vehicles (PHEVs), FEMP offers technical guidance on electric vehicle supply equipment (EVSE) installations and site-specific planning through partnerships with the National Renewable Energy Laboratory’s EVSE Tiger Teams.

  13. Alternative Fuels Data Center: Plug-In Electric Vehicle Deployment Policy

    Science.gov Websites

    addendum to a pre-existing zoning ordinance to specify permissible use of EVSE in single- and multi-family -ready requirements may include EVSE installation, pre-wiring, or space reservation. California building charging infrastructure. Examples include the scope of EVSE pre-wiring or installation from a

  14. 46 CFR 167.40-1 - Electrical installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... (Electrical Engineering) of this chapter. (3) Institute of Electrical and Electronic Engineers, Inc. (IEEE... 46 Shipping 7 2011-10-01 2011-10-01 false Electrical installations. 167.40-1 Section 167.40-1... SHIPS Certain Equipment Requirements § 167.40-1 Electrical installations. (a) Except as otherwise...

  15. 46 CFR 167.40-1 - Electrical installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... (Electrical Engineering) of this chapter. (3) Institute of Electrical and Electronic Engineers, Inc. (IEEE... 46 Shipping 7 2012-10-01 2012-10-01 false Electrical installations. 167.40-1 Section 167.40-1... SHIPS Certain Equipment Requirements § 167.40-1 Electrical installations. (a) Except as otherwise...

  16. 46 CFR 167.40-1 - Electrical installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... (Electrical Engineering) of this chapter. (3) Institute of Electrical and Electronic Engineers, Inc. (IEEE... 46 Shipping 7 2014-10-01 2014-10-01 false Electrical installations. 167.40-1 Section 167.40-1... SHIPS Certain Equipment Requirements § 167.40-1 Electrical installations. (a) Except as otherwise...

  17. 46 CFR 167.40-1 - Electrical installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... (Electrical Engineering) of this chapter. (3) Institute of Electrical and Electronic Engineers, Inc. (IEEE... 46 Shipping 7 2013-10-01 2013-10-01 false Electrical installations. 167.40-1 Section 167.40-1... SHIPS Certain Equipment Requirements § 167.40-1 Electrical installations. (a) Except as otherwise...

  18. Mountain Plains Learning Experience Guide: Electrical Wiring. Course: Electrical Wiring Trim-Out.

    ERIC Educational Resources Information Center

    Arneson, R.; And Others

    One of two individualized courses included in an electrical wiring curriculum, this course covers electrical materials installation for the trim-out stage. The course is comprised of five units: (1) Outlets, (2) Fixtures, (3) Switches, (4) Appliances, and (5) Miscellaneous. Each unit begins with a Unit Learning Experience Guide that gives…

  19. Fluid assisted installation of electrical cable accessories

    DOEpatents

    Mayer, Robert W.; Silva, Frank A.

    1977-01-01

    An electrical cable accessory includes a generally tubular member of elastomeric material which is to be installed by placement over a cylindrical surface to grip the cylindrical surface, when in appropriate assembled relation therewith, with a predetermined gripping force established by dilation of the tubular member, the installation being facilitated by introducing fluid under pressure, through means provided in the tubular member, between the tubular member and the cylindrical surface, and simultaneously impeding the escape of the fluid under pressure from between the tubular member and the cylindrical surface by means adjacent one of the ends of the tubular member to cause dilation of the tubular member and establish a fluid layer between the tubular member and the cylindrical surface, thereby reducing the gripping force during installation.

  20. Proposed Columbia Wind Farm No. 1 : Final Environmental Impact Statement, Joint NEPA/SEPA.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Klickitat County

    1995-09-01

    CARES proposes to construct and operate the 25 megawatt Columbia Wind Farm No. 1 (Project) in the Columbia Hills area of Klickitat County, Washington known as Juniper Point. Wind is not a constant resource and based on the site wind measurement data, it is estimated that the Project would generate approximately 7 average annual MWs of electricity. BPA proposes to purchase the electricity generated by the Project. CARES would execute a contractual agreement with a wind developer, to install approximately 91 wind turbines and associated facilities to generate electricity. The Project`s construction and operation would include: install concrete pier foundationsmore » for each wind turbine; install 91 model AWT-26 wind turbines using 43 m high guyed tubular towers on the pier foundations; construct a new 115/24-kv substation; construct a 149 m{sup 2} steel operations and maintenance building; install 25 pad mount transformers along the turbine access roads; install 4.0 km of underground 24 kv power collection lines to collect power from individual turbines to the end of turbine strings; install 1.2 km of underground communication and transmission lines from each turbine to a pad mount transformer; install 5.6 km of 24 kv wood pole transmission lines to deliver electricity from the pad mount transformers to the Project substation; install 3.2 km of 115 kv wood pole transmission lines to deliver electricity from the Project substation to the Public Utility District No. 1 of Klickitat County(PUD)115 kv Goldendale line; interconnect with the BPA transmission system through the Goldendale line and Goldendale substation owned by the PUD; reconstruct, upgrade, and maintain 8.0 km of existing roads; construct and maintain 6.4 km of new graveled roads along the turbine strings and to individual turbines; and install meteorological towers guyed with rebar anchors on the Project site.« less

  1. Advance release of data for the 1980 Statistical Year Book of the electric utility industry. [Monograph; data tables

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1981-01-01

    This monograph consists of 25 data tables that will be included in the subject year book, revealing such information as: total US installed generating capacity; installed capacity by states; installed capacity by ownership and type of prime mover; capability - peak load - kWh requirements; generation by states; generation by fuel; sales by years and classes of service; ultimate customers - by years and classes of service; revenues - by years and classes of service; average use and revenue per customer; average revenues per kWh sold; consumption of fossil fuels for electric generation; construction expenditures; and public-utility long-term financing.

  2. Mountain Plains Learning Experience Guide: Electrical Wiring. Course: Electrical Wiring Rough-In.

    ERIC Educational Resources Information Center

    Arneson, R.; And Others

    One of two individualized courses included in an electrical wiring curriculum, this course covers electrical installations that are generally hidden within the structure. The course is comprised of four units: (1) Outlet and Switch Boxes, (2) Wiring, (3) Service Entrance, and (4) Signal and Low Voltage Systems. Each unit begins with a Unit…

  3. 46 CFR 195.05-1 - Installation and details.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH VESSELS VESSEL... of this type include the following: Ship's Service Generating Systems. Ship's Service Power... Lighting and Power Systems. Electric Lifeboat Winch Systems. Electric Steering Gear and Steering Control...

  4. 29 CFR 1910.254 - Arc welding and cutting.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 80 volts. (c) Installation of arc welding equipment—(1) General. Installation including power supply... mechanically strong and electrically adequate for the required current. (3) Supply connections and conductors...-carrying capacity of the supply conductors shall be not less than the rated primary current of the welding...

  5. 30 CFR 77.516 - Electric wiring and equipment; installation and maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Electric wiring and equipment; installation and... OF UNDERGROUND COAL MINES Electrical Equipment-General § 77.516 Electric wiring and equipment; installation and maintenance. In addition to the requirements of §§ 77.503 and 77.506, all wiring and...

  6. 24 CFR 3285.701 - Electrical crossovers.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Electrical Systems and Equipment § 3285.701 Electrical crossovers. Multi-section homes with electrical wiring in more than one section require... installation instructions. ...

  7. 46 CFR 96.05-1 - Installation and details.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communications Systems § 96.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or... be in accordance with the requirements of subchapter J (Electrical Engineering) of this chapter...

  8. 46 CFR 77.05-1 - Installation and details.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communication Systems § 77.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or interior... accordance with the requirements of subchapter J (Electrical Engineering) of this chapter. Systems of this...

  9. 46 CFR 77.05-1 - Installation and details.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communication Systems § 77.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or interior... accordance with the requirements of subchapter J (Electrical Engineering) of this chapter. Systems of this...

  10. 46 CFR 96.05-1 - Installation and details.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communications Systems § 96.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or... be in accordance with the requirements of subchapter J (Electrical Engineering) of this chapter...

  11. 46 CFR 77.05-1 - Installation and details.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communication Systems § 77.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or interior... accordance with the requirements of subchapter J (Electrical Engineering) of this chapter. Systems of this...

  12. 46 CFR 96.05-1 - Installation and details.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communications Systems § 96.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or... be in accordance with the requirements of subchapter J (Electrical Engineering) of this chapter...

  13. 46 CFR 96.05-1 - Installation and details.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communications Systems § 96.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or... be in accordance with the requirements of subchapter J (Electrical Engineering) of this chapter...

  14. 46 CFR 96.05-1 - Installation and details.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communications Systems § 96.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or... be in accordance with the requirements of subchapter J (Electrical Engineering) of this chapter...

  15. 46 CFR 77.05-1 - Installation and details.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communication Systems § 77.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or interior... accordance with the requirements of subchapter J (Electrical Engineering) of this chapter. Systems of this...

  16. 46 CFR 77.05-1 - Installation and details.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communication Systems § 77.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or interior... accordance with the requirements of subchapter J (Electrical Engineering) of this chapter. Systems of this...

  17. 78 FR 23685 - Airworthiness Directives; The Boeing Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-22

    ... installing new operational software for the electrical load management system and configuration database. The..., installing a new electrical power control panel, and installing new operational software for the electrical load management system and configuration database. Since the proposed AD was issued, we have received...

  18. 14 CFR 25.1365 - Electrical appliances, motors, and transformers.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... transformers. 25.1365 Section 25.1365 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF... Equipment § 25.1365 Electrical appliances, motors, and transformers. (a) Domestic appliances must be... transformers, including those installed in domestic systems, must have a suitable thermal protection device to...

  19. 14 CFR 25.1365 - Electrical appliances, motors, and transformers.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... transformers. 25.1365 Section 25.1365 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF... Equipment § 25.1365 Electrical appliances, motors, and transformers. (a) Domestic appliances must be... transformers, including those installed in domestic systems, must have a suitable thermal protection device to...

  20. 14 CFR 25.1365 - Electrical appliances, motors, and transformers.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... transformers. 25.1365 Section 25.1365 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF... Equipment § 25.1365 Electrical appliances, motors, and transformers. (a) Domestic appliances must be... transformers, including those installed in domestic systems, must have a suitable thermal protection device to...

  1. 14 CFR 25.1365 - Electrical appliances, motors, and transformers.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... transformers. 25.1365 Section 25.1365 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF... Equipment § 25.1365 Electrical appliances, motors, and transformers. (a) Domestic appliances must be... transformers, including those installed in domestic systems, must have a suitable thermal protection device to...

  2. 14 CFR 25.1365 - Electrical appliances, motors, and transformers.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... transformers. 25.1365 Section 25.1365 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF... Equipment § 25.1365 Electrical appliances, motors, and transformers. (a) Domestic appliances must be... transformers, including those installed in domestic systems, must have a suitable thermal protection device to...

  3. Solar Adoption and Energy Consumption in the Residential Sector

    NASA Astrophysics Data System (ADS)

    McAllister, Joseph Andrew

    This dissertation analyzes the energy consumption behavior of residential adopters of solar photovoltaic systems (solar-PV). Based on large data sets from the San Diego region that have been assembled or otherwise acquired by the author, the dissertation quantifies changes in energy consumption after solar-PV installation and determines whether certain household characteristics are correlated with such changes. In doing so, it seeks to answer two related questions: First, "Do residential solar adopters increase or decrease their electricity consumption after they install a solar-PV system?" Assuming that certain categories of residential adopters increase and others decrease, the second question is "Which residential adopters increase and which decrease their consumption and why?" The database that was used to conduct this analysis includes information about 5,243 residential systems in San Diego Gas & Electric's (SDG&E) service territory installed between January 2007 and December 2010. San Diego is a national leader in the installation of small-scale solar-electric systems, with over 12,000 systems in the region installed as of January 2012, or around 14% of the total number installed in California. The author performed detailed characterization of a significant subset of the solar installations in the San Diego region. Assembled data included technical and economic characteristics of the systems themselves; the solar companies that sold and installed them; individual customer electric utility billing data; metered PV production data for a subgroup of these solar systems; and data about the properties where the systems are located. Primarily, the author was able to conduct an electricity consumption analysis at the individual household level for 2,410 PV systems installed in SDG&E service territory between January 2007 and December 2010. This analysis was designed to detect changes in electricity consumption from the pre-solar to the post-installation period. To the extent increases are present for some solar adopters, the analysis seeks to determine whether there is a "solar rebound" effect analogous to the "rebound" or "take-back" effect that has been observed and studied within the energy efficiency literature. Similarly, to the extent that electric users may decrease overall consumption after installation of a solar system, the study seeks to explore the possibility that solar adoption is part of a continued effort towards clean energy practices more generally, such as energy efficiency and conservation. In this way, the study seeks to determine whether there is a synergistic effect between solar and decreased consumption, for solar adopters generally or for some subsets therein. The assembled data allowed testing of various hypotheses that could help explain observed changes in consumption in different households. One variable that was carefully examined was the sizing of the solar system. As part of the study, analysis of 4,355 systems was conducted to determine how each residential solar system was sized with respect to pre-installation energy consumption. Other potentially interesting or explanatory variables for which information was available include total and net costs of the solar system; age of the home; the climate zone (inland or coastal) where the home is located; the home's pre-installation energy consumption; home characteristics such as assessed value and square footage; and the identity of the solar installation contractor. Aside from extending the literature on the rebound effect to the context of home-based energy generation, this study links to the innovation diffusion literature by focusing on solar "innovators" to understand more about the characteristics that may drive behavior, or conditions under which they also adopt clean energy technologies and practices. The results have clear policy relevance with regard to the development and coordination of policies to promote integration of solar and energy efficiency. Currently several public policies are being developed at various levels of government to encourage both, based on application of the economically rational concept of the "loading order", the California policy that places energy efficiency as the state's highest priority energy resource. However, there has been little study of the interrelationships between them or how these innovations are implemented in practice. This dissertation begins to fill that gap.

  4. The choice of primary energy source including PV installation for providing electric energy to a public utility building - a case study

    NASA Astrophysics Data System (ADS)

    Radomski, Bartosz; Ćwiek, Barbara; Mróz, Tomasz M.

    2017-11-01

    The paper presents multicriteria decision aid analysis of the choice of PV installation providing electric energy to a public utility building. From the energy management point of view electricity obtained by solar radiation has become crucial renewable energy source. Application of PV installations may occur a profitable solution from energy, economic and ecologic point of view for both existing and newly erected buildings. Featured variants of PV installations have been assessed by multicriteria analysis based on ANP (Analytic Network Process) method. Technical, economical, energy and environmental criteria have been identified as main decision criteria. Defined set of decision criteria has an open character and can be modified in the dialog process between the decision-maker and the expert - in the present case, an expert in planning of development of energy supply systems. The proposed approach has been used to evaluate three variants of PV installation acceptable for existing educational building located in Poznań, Poland - the building of Faculty of Chemical Technology, Poznań University of Technology. Multi-criteria analysis based on ANP method and the calculation software Super Decisions has proven to be an effective tool for energy planning, leading to the indication of the recommended variant of PV installation in existing and newly erected public buildings. Achieved results show prospects and possibilities of rational renewable energy usage as complex solution to public utility buildings.

  5. Numerical modelling of processes that occur in the selective waste disassembly installation

    NASA Astrophysics Data System (ADS)

    Cherecheş, T.; Lixandru, P.; Dragnea, D.; Cherecheş, D. M.

    2017-08-01

    This paper is the result of the attempts of quantitative approach of some of the processes that are occurring in the selective fragmentation with high voltage pulses installation. It has been formulated a methodology which customizes the general methods for the issue of transient electric field in mixed environments. The electromagnetic processes inside the fragmentation installation, the initiation and formation of the discharge channels, the thermodynamic and mechanical effects in the process vessel are complex, transient and very quick. One of the underlying principles of the fragmentation process consists in the differentiated reaction of materials in an electric field. Generally in the process vessel there can be found together three types of materials: dielectrics, metal, electrolytes. The conductivity of dielectric materials is virtually zero. Metallic materials conduct very well through electronic conductivity. Electrolytes have a more modest conductivity since they conduct through electrochemical processes. The electrical current, in this case, is the movement of ions having sizes and the masses different from the electrons. Here, the electric current includes displacements of ions and molecules, collisions and chemical reactions. Part of the electrical field’s energy is absorbed by the electrolyte in the form of mechanical and chemical energy.

  6. Sustainable Federal Fleets: Deploying Electric Vehicles and Electric Vehicle Supply Equipment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    The U.S. Department of Energy (DOE) Federal Energy Management Program (FEMP) helps federal agencies reduce petroleum consumption and increase alternative fuel use through its resources for Sustainable Federal Fleets. To assist agencies with the transition to plug-in electric vehicles (PEVs), including battery electric vehicles (BEVs) and plug-in hybrid electric vehicles (PHEVs), FEMP offers technical guidance on electric vehicle supply equipment (EVSE) installations and site-specific planning through partnerships with the National Renewable Energy Laboratory's (NREL's) EVSE Tiger Teams.

  7. Solar Cogeneration of Electricity and Hot Water at DoD Installations

    DTIC Science & Technology

    2014-06-01

    EW-201248) Solar Cogeneration of Electricity and Hot Water at DoD Installations June 2014 This report was prepared under contract to the...2014 ESTCP COST AND PERFORMANCE REPORT Solar Cogeneration of Electricity and Hot Water at DoD Installations W912HQ-12-C-0053 EW-201248Ratson...demonstrate an innovative hybrid electric/thermal solar cogeneration system, document performance and cost advantages, and develop financing models and

  8. Breakeven Prices for Photovoltaics on Supermarkets in the United States

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ong, S.; Clark, N.; Denholm, P.

    The photovoltaic (PV) breakeven price is the PV system price at which the cost of PV-generated electricity equals the cost of electricity purchased from the grid. This point is also called 'grid parity' and can be expressed as dollars per watt ($/W) of installed PV system capacity. Achieving the PV breakeven price depends on many factors, including the solar resource, local electricity prices, customer load profile, PV incentives, and financing. In the United States, where these factors vary substantially across regions, breakeven prices vary substantially across regions as well. In this study, we estimate current and future breakeven prices formore » PV systems installed on supermarkets in the United States. We also evaluate key drivers of current and future commercial PV breakeven prices by region. The results suggest that breakeven prices for PV systems installed on supermarkets vary significantly across the United States. Non-technical factors -- including electricity rates, rate structures, incentives, and the availability of system financing -- drive break-even prices more than technical factors like solar resource or system orientation. In 2020 (where we assume higher electricity prices and lower PV incentives), under base-case assumptions, we estimate that about 17% of supermarkets will be in utility territories where breakeven conditions exist at a PV system price of $3/W; this increases to 79% at $1.25/W (the DOE SunShot Initiative's commercial PV price target for 2020). These percentages increase to 26% and 91%, respectively, when rate structures favorable to PV are used.« less

  9. 46 CFR 70.25-1 - Electrical engineering details.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 3 2013-10-01 2013-10-01 false Electrical engineering details. 70.25-1 Section 70.25-1... General Electrical Engineering Requirements § 70.25-1 Electrical engineering details. All electrical engineering details and installations shall be designed and installed in accordance with subchapter J...

  10. 46 CFR 70.25-1 - Electrical engineering details.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Electrical engineering details. 70.25-1 Section 70.25-1... General Electrical Engineering Requirements § 70.25-1 Electrical engineering details. All electrical engineering details and installations shall be designed and installed in accordance with subchapter J...

  11. 46 CFR 90.25-1 - Electrical engineering details.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Electrical engineering details. 90.25-1 Section 90.25-1... PROVISIONS General Electrical Engineering Requirements § 90.25-1 Electrical engineering details. (a) All electrical engineering details and installations shall be designed and installed in accordance with...

  12. 46 CFR 90.25-1 - Electrical engineering details.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Electrical engineering details. 90.25-1 Section 90.25-1... PROVISIONS General Electrical Engineering Requirements § 90.25-1 Electrical engineering details. (a) All electrical engineering details and installations shall be designed and installed in accordance with...

  13. 46 CFR 70.25-1 - Electrical engineering details.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 3 2011-10-01 2011-10-01 false Electrical engineering details. 70.25-1 Section 70.25-1... General Electrical Engineering Requirements § 70.25-1 Electrical engineering details. All electrical engineering details and installations shall be designed and installed in accordance with subchapter J...

  14. 46 CFR 70.25-1 - Electrical engineering details.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 3 2014-10-01 2014-10-01 false Electrical engineering details. 70.25-1 Section 70.25-1... General Electrical Engineering Requirements § 70.25-1 Electrical engineering details. All electrical engineering details and installations shall be designed and installed in accordance with subchapter J...

  15. 46 CFR 70.25-1 - Electrical engineering details.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 3 2012-10-01 2012-10-01 false Electrical engineering details. 70.25-1 Section 70.25-1... General Electrical Engineering Requirements § 70.25-1 Electrical engineering details. All electrical engineering details and installations shall be designed and installed in accordance with subchapter J...

  16. 46 CFR 90.25-1 - Electrical engineering details.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Electrical engineering details. 90.25-1 Section 90.25-1... PROVISIONS General Electrical Engineering Requirements § 90.25-1 Electrical engineering details. (a) All electrical engineering details and installations shall be designed and installed in accordance with...

  17. 46 CFR 90.25-1 - Electrical engineering details.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Electrical engineering details. 90.25-1 Section 90.25-1... PROVISIONS General Electrical Engineering Requirements § 90.25-1 Electrical engineering details. (a) All electrical engineering details and installations shall be designed and installed in accordance with...

  18. 46 CFR 90.25-1 - Electrical engineering details.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Electrical engineering details. 90.25-1 Section 90.25-1... PROVISIONS General Electrical Engineering Requirements § 90.25-1 Electrical engineering details. (a) All electrical engineering details and installations shall be designed and installed in accordance with...

  19. Maximizing the Value of Photovoltaic Installations on Schools in California: Choosing the Best Electricity Rates

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ong, S.; Denholm, P.

    2011-07-01

    Schools in California often have a choice between multiple electricity rate options. For schools with photovoltaic (PV) installations, choosing the right rate is essential to maximize the value of PV generation. The rate option that minimizes a school?s electricity expenses often does not remain the most economical choice after the school installs a PV system. The complex interaction between PV generation, building load, and rate structure makes determining the best rate a challenging task. This report evaluates 22 rate structures across three of California?s largest electric utilities--Pacific Gas and Electric Co. (PG&E), Southern California Edison (SCE), and San Diego Gasmore » and Electric (SDG&E)--in order to identify common rate structure attributes that are favorable to PV installations.« less

  20. 46 CFR 129.200 - Design, installation, and maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Design, installation, and maintenance. 129.200 Section 129.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS General Requirements § 129.200 Design, installation, and maintenance. Electrical equipment on a vessel must be designed,...

  1. 46 CFR 129.200 - Design, installation, and maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Design, installation, and maintenance. 129.200 Section 129.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS General Requirements § 129.200 Design, installation, and maintenance. Electrical equipment on a vessel must be designed,...

  2. Solar Cogeneration of Electricity and Hot Water at DoD Installations

    DTIC Science & Technology

    2014-05-01

    the cogeneration system displaces more energy (the impact is not 4-5X because the GHG intensity factors for offsetting electricity generation and...FINAL REPORT Solar Cogeneration of Electricity and Hot Water at DoD Installations ESTCP Project EW-201248 MAY 2014 Ratson Morad... Cogeneration of Electricity and Hot Water at DoD Installations 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d

  3. 75 FR 81433 - Airworthiness Directives; Airbus Model A321-211, -212, -231, and -232 Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-28

    ... join individual electrical wires in the Wing Tank harness installations to in-tank equipment on QT... are used to join individual electrical wires in the Wing Tank harness installations to in-tank... electrical wires in the Wing Tank harness installations to in-tank equipment on QT circuit. The failure of a...

  4. Bexar County Parking Garage Photovoltaic Panels

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weir, Golda

    2012-01-23

    The main objective of the Bexar County Parking Garage Photovoltaic (PV) Panel project is to install a PV System that will promote the use of renewable energy. This project will also help sustain Bexar County ongoing greenhouse gas emissions reduction and energy efficiency goals. The scope of this project includes the installation of a 100-kW system on the top level of a new 236,285 square feet parking garage. The PV system consists of 420 solar panels that covers 7,200 square feet and is tied into the electric-grid. It provides electricity to the office area located within the garage. The estimatedmore » annual electricity production of the PV system is 147,000 kWh per year.« less

  5. Features of electromagnetic processes in electric gas turbine installations

    NASA Astrophysics Data System (ADS)

    Kislyakov, M. A.; Chernov, V. A.; Maksimkin, V. L.; Bozhin, Yu. M.

    2017-12-01

    Electric gas turbine aggregates are considered in terms of ensuring reliable operation of gas-dynamic bearings. A complex of unfavorable factors affecting this unit of the installation is described, including rotor unbalance, eccentricity, irregularity of armature field rotation, its amplitude variation during rotor rotation, etc. The studies have shown that it is possible to increase the efficiency of EGTA by increasing the number of armature winding phases (i.e. reducing electromagnetic torque ripples), amplifying the damping circuits on the rotor, as well as by introducing pulse-width modulation of currents in the phases and flexible feedbacks.

  6. Industrial application of low voltage bidirectional automatic release of reserve

    NASA Astrophysics Data System (ADS)

    Popa, G. N.; Diniş, C. M.; Iagăr, A.; Deaconu, S. I.; Popa, I.

    2018-01-01

    The paper presents an analysis on low voltage industrial electrical installation controlled by bidirectional automatic release of reserve. Industrial electrical installation is for removing smoke in case of fire from a textile company. The main parts of the installation of removing smoke in case of fire are: general electrical panel; reserve electrical panel; three-phase induction motors for driven fans; electrical actuators for inlet and outlet valves; clean air inlet pipe, respectively, the outlet pipe for smoke. The operation and checking of bidirectional automatic release of reserve are present in the paper.

  7. 29 CFR 1910.308 - Special systems.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Electrical Design Safety Standards for Electrical Systems § 1910.308... conductors shall be installed in rigid metal conduit, in intermediate metal conduit, in electrical metallic... are installed in an identified common mounting with electrical connections that will divide the...

  8. 29 CFR 1910.308 - Special systems.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Electrical Design Safety Standards for Electrical Systems § 1910.308... conductors shall be installed in rigid metal conduit, in intermediate metal conduit, in electrical metallic... are installed in an identified common mounting with electrical connections that will divide the...

  9. 29 CFR 1910.308 - Special systems.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Electrical Design Safety Standards for Electrical Systems § 1910.308... conductors shall be installed in rigid metal conduit, in intermediate metal conduit, in electrical metallic... are installed in an identified common mounting with electrical connections that will divide the...

  10. 29 CFR 1910.308 - Special systems.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Electrical Design Safety Standards for Electrical Systems § 1910.308... conductors shall be installed in rigid metal conduit, in intermediate metal conduit, in electrical metallic... are installed in an identified common mounting with electrical connections that will divide the...

  11. 29 CFR 1910.308 - Special systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Electrical Design Safety Standards for Electrical Systems § 1910.308... conductors shall be installed in rigid metal conduit, in intermediate metal conduit, in electrical metallic... are installed in an identified common mounting with electrical connections that will divide the...

  12. Installation-Wide Energy Conservation Demonstration at Fort McClellan, Alabama

    DTIC Science & Technology

    1988-11-01

    Inefficient Electrical Motors 12 Dispensary Chiller Installation 12 Combustion Optimization of Gas-fired Heating Equipment 12 Infiltration Study of Family... Chiller Installation 34 5 FAMILY HOUSING .................................................... 37 Combustion Optimization of Gas-fired Heating...in Outdoor Air Ventilation 59 Replacement of Inefficient Electric Motors 59 Dispensary Chiller Installation 60 Combustion Optimization of Gas-fired

  13. 46 CFR 169.673 - Installation of wiring for power and lighting circuits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Installation of wiring for power and lighting circuits... SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical Electrical Installations Operating at Potentials of Less Than 50 Volts on Vessels of Less Than 100 Gross Tons § 169.673 Installation of wiring for...

  14. 40. 1911 ELECTRIC MOTOR INSTALLATION: Photocopy of July 1911 photograph ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    40. 1911 ELECTRIC MOTOR INSTALLATION: Photocopy of July 1911 photograph showing the installed 600hp General Electric motor at the Washington and Mason Streets powerhouse. View towards the south wall of the first floor. Note the engineer's shack and switchboard behind the motor and its pinion gear. - San Francisco Cable Railway, Washington & Mason Streets, San Francisco, San Francisco County, CA

  15. Diagnosis of Insulation Condition of MV Switchgears by Application of Different Partial Discharge Measuring Methods and Sensors

    PubMed Central

    2018-01-01

    Partial discharges (PD) measurement provides valuable information for the condition assessment of the insulation status of high-voltage (HV) electrical installations. During the last three decades, several PD sensors and measuring techniques have been developed to perform accurate diagnostics when PD measurements are carried out on-site and on-line. For utilities, the most attractive characteristics of on-line measurements are that once the sensors are installed in the grid, the electrical service is uninterrupted and that electrical systems are tested in real operating conditions. In medium-voltage (MV) and HV installations, one of the critical points where an insulation defect can occur is inside metal-clad switchgears (including the cable terminals connected to them). Thus, this kind of equipment is increasingly being monitored to carry out proper maintenance based on their condition. This paper presents a study concerning the application of different electromagnetic measuring techniques (compliant with IEC 62478 and IEC 60270 standards), together with the use of suitable sensors, which enable the evaluation of the insulation condition mainly in MV switchgears. The main scope is to give a general overview about appropriate types of electromagnetic measuring methods and sensors to be applied, while considering the level of detail and accuracy in the diagnosis and the particular fail-save requirements of the electrical installations where the switchgears are located. PMID:29495601

  16. 30 CFR 75.523-1 - Deenergization of self-propelled electric face equipment installation requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Deenergization of self-propelled electric face... Electrical Equipment-General § 75.523-1 Deenergization of self-propelled electric face equipment installation requirements. (a) Except as provided in paragraphs (b) and (c) of this section, all self-propelled electric...

  17. 30 CFR 75.523-1 - Deenergization of self-propelled electric face equipment installation requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Deenergization of self-propelled electric face... Electrical Equipment-General § 75.523-1 Deenergization of self-propelled electric face equipment installation requirements. (a) Except as provided in paragraphs (b) and (c) of this section, all self-propelled electric...

  18. 30 CFR 75.523-1 - Deenergization of self-propelled electric face equipment installation requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Deenergization of self-propelled electric face... Electrical Equipment-General § 75.523-1 Deenergization of self-propelled electric face equipment installation requirements. (a) Except as provided in paragraphs (b) and (c) of this section, all self-propelled electric...

  19. 30 CFR 75.523-1 - Deenergization of self-propelled electric face equipment installation requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Deenergization of self-propelled electric face... Electrical Equipment-General § 75.523-1 Deenergization of self-propelled electric face equipment installation requirements. (a) Except as provided in paragraphs (b) and (c) of this section, all self-propelled electric...

  20. 30 CFR 75.523-1 - Deenergization of self-propelled electric face equipment installation requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Deenergization of self-propelled electric face... Electrical Equipment-General § 75.523-1 Deenergization of self-propelled electric face equipment installation requirements. (a) Except as provided in paragraphs (b) and (c) of this section, all self-propelled electric...

  1. Manufacturing and quality control of interconnecting wire harnesses, Volume 4

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The document covers interconnecting wire harnesses defined in the design standard, including type 8, flat conductor cable. Volume breadth covers installations of groups of harnesses in a major assembly and the associated post installation inspections and electrical tests. Knowledge gained through experience on the Saturn 5 program coupled with recent advances in techniques, materials, and processes was incorporated into this document.

  2. 10 CFR 205.379 - Application for approval of the installation of permanent facilities for emergency use only.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... PROCEDURES AND SANCTIONS Electric Power System Permits and Reports; Applications; Administrative Procedures and Sanctions Emergency Interconnection of Electric Facilities and the Transfer of Electricity to Alleviate An Emergency Shortage of Electric Power § 205.379 Application for approval of the installation of...

  3. 30 CFR 250.114 - How must I install and operate electrical equipment?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... (a) You must classify all areas according to API RP 500, Recommended Practice for Classification of... Division 2, or API RP 505, Recommended Practice for Classification of Locations for Electrical... and hazards of electrical equipment. (c) You must install all electrical systems according to API RP...

  4. 46 CFR 111.33-5 - Installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...

  5. 46 CFR 111.33-5 - Installation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...

  6. 46 CFR 111.33-5 - Installation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...

  7. 46 CFR 111.33-5 - Installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...

  8. 46 CFR 111.33-5 - Installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...

  9. Installation guidelines for solar heating system, single-family residence at William OBrien State Park, Stillwater, Minnesota

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Installation procedures for the single family residential solar heating system at the William O'Brien State Park, Stillwater, Minnesota, are presented. The system is a solar-assisted, hydronic-to-warm-air system with solar-assisted domestic water heating. It is composed of the following major components: liquid cooled flat plate collectors; water storage tank; passive solar-fired domestic water preheater; electric hot water heater; heat pump with electric backup; solar hot water coil unit; tube-and-shell heat exchanger, three pumps, and associated pipes and valving in an energy transport module; control system; and air-cooled heat purge unit. Installer guidelines are provided for each subsystem and includes testing and filling the system. Information is also given on the operating procedures, controls, caution requirements and routine and schedule maintenance.

  10. 30 CFR 77.1109 - Quantity and location of firefighting equipment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... construction. (c)(1) Mobile equipment, including trucks, front-end loaders, bulldozers, portable welding units...) Fire extinguishers shall be provided at permanent electrical installations commensurate with the...

  11. KSC-01pp0249

    NASA Image and Video Library

    2001-02-03

    An overhead crane lowers the Multi-Purpose Logistics Module Donatello onto a workstand. In the SSPF, Donatello will undergo processing by the payload test team, including integrated electrical tests with other Station elements in the SSPF, leak tests, electrical and software compatibility tests with the Space Shuttle (using the Cargo Integrated Test equipment) and an Interface Verification Test once the module is installed in the Space Shuttle’s payload bay at the launch pad. The most significant mechanical task to be performed on Donatello in the SSPF is the installation and outfitting of the racks for carrying the various experiments and cargo. Donatello will be launched on mission STS-130, currently planned for September 2004

  12. 30 CFR 250.114 - How must I install and operate electrical equipment?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... their facilities. (a) You must classify all areas according to API RP 500, Recommended Practice for... 1 and Division 2, or API RP 505, Recommended Practice for Classification of Locations for Electrical... electrical systems according to API RP 14F, Recommended Practice for Design and Installation of Electrical...

  13. 30 CFR 250.114 - How must I install and operate electrical equipment?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... their facilities. (a) You must classify all areas according to API RP 500, Recommended Practice for... 1 and Division 2, or API RP 505, Recommended Practice for Classification of Locations for Electrical... electrical systems according to API RP 14F, Recommended Practice for Design and Installation of Electrical...

  14. 30 CFR 250.114 - How must I install and operate electrical equipment?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... their facilities. (a) You must classify all areas according to API RP 500, Recommended Practice for... 1 and Division 2, or API RP 505, Recommended Practice for Classification of Locations for Electrical... electrical systems according to API RP 14F, Recommended Practice for Design and Installation of Electrical...

  15. 46 CFR 110.01-1 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Applicability § 110.01-1 General. (a) This subchapter applies to all electrical installations on vessels subject to... electrical installation to be in accordance with this subchapter. (b) This subchapter applies only to...

  16. 46 CFR 110.01-1 - General.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Applicability § 110.01-1 General. (a) This subchapter applies to all electrical installations on vessels subject to... electrical installation to be in accordance with this subchapter. (b) This subchapter applies only to...

  17. 46 CFR 110.01-1 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Applicability § 110.01-1 General. (a) This subchapter applies to all electrical installations on vessels subject to... electrical installation to be in accordance with this subchapter. (b) This subchapter applies only to...

  18. 46 CFR 111.30-1 - Location and installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Location and installation. 111.30-1 Section 111.30-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-1 Location and installation. Each switchboard must meet the...

  19. 46 CFR 111.30-1 - Location and installation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Location and installation. 111.30-1 Section 111.30-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-1 Location and installation. Each switchboard must meet the...

  20. 46 CFR 111.30-1 - Location and installation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Location and installation. 111.30-1 Section 111.30-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-1 Location and installation. Each switchboard must meet the...

  1. 46 CFR 111.30-1 - Location and installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Location and installation. 111.30-1 Section 111.30-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-1 Location and installation. Each switchboard must meet the...

  2. 46 CFR 111.30-1 - Location and installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Location and installation. 111.30-1 Section 111.30-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-1 Location and installation. Each switchboard must meet the...

  3. 75 FR 26743 - Pacific Gas and Electric Company; Notice of Environmental Site Review and Technical Meetings To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-12

    ... Ocean, 2.5 to 3.0 nautical miles west of Manila on Samoa Peninsula of Humboldt Bay, near Eureka... Conversion devises (WEC), including multi-point catenary moorings and anchors; (2) marker buoys, navigation... interconnection to the electrical grid; and (6) appurtenant facilities. WEC types that may be installed may...

  4. The efficiency of the use of composite materials in electrotechnical equipment

    NASA Astrophysics Data System (ADS)

    Kim, K.; Ivanov, S.

    2018-02-01

    The indicators of the efficiency of electrical installations are directly connected with the creating and using of new composite materials with the desired performance properties. The practical application of composite materials is one of the perspective scientific and technical directions, providing the increase of the efficiency of electrical installations due to the sealing of current parts by protecting them from the external medium. The technical characteristics of the composite material match to its structure and depend on the properties of the individual components. The verification of the compliance of material parameters is implemented by the methods of the computer analysis of a model of composite material in the form of the structure in which the individual elements have thermodynamic properties of the corresponding phase state. In the study the topology of individual elements in the material structure is defined by the conditional boundaries of the section within the studied composite. The efficiency of using the composite materials includes the raising of electrical safety, increasing the durability, reducing the costs of maintenance and repair and the extension of the scope of installations.

  5. 46 CFR 76.27-15 - Operation and installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Operation and installation. 76.27-15 Section 76.27-15... EQUIPMENT Electric Fire Detecting System, Details § 76.27-15 Operation and installation. (a) The system... system. (e) All wiring and electrical circuits and equipment shall meet the applicable requirements of...

  6. 24 CFR 3280.208 - Smoke alarm requirements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... basement and must install at the factory an electrical junction box for the installation of this smoke... when a home is equipped or designed for future installation of a roof-mounted evaporative cooler or... system must be mounted on an electrical outlet box and connected by a permanent wiring method to a...

  7. 30 CFR 75.340 - Underground electrical installations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... electrical installations. (a) Underground transformer stations, battery charging stations, substations... with transformers that are either dry-type or contain nonflammable liquid, if they are located at or...

  8. 30 CFR 75.340 - Underground electrical installations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... electrical installations. (a) Underground transformer stations, battery charging stations, substations... with transformers that are either dry-type or contain nonflammable liquid, if they are located at or...

  9. 30 CFR 75.340 - Underground electrical installations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... electrical installations. (a) Underground transformer stations, battery charging stations, substations... with transformers that are either dry-type or contain nonflammable liquid, if they are located at or...

  10. 30 CFR 75.340 - Underground electrical installations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... electrical installations. (a) Underground transformer stations, battery charging stations, substations... with transformers that are either dry-type or contain nonflammable liquid, if they are located at or...

  11. 30 CFR 75.340 - Underground electrical installations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... electrical installations. (a) Underground transformer stations, battery charging stations, substations... with transformers that are either dry-type or contain nonflammable liquid, if they are located at or...

  12. Multi-step heater deployment in a subsurface formation

    DOEpatents

    Mason, Stanley Leroy [Allen, TX

    2012-04-03

    A method for installing a horizontal or inclined subsurface heater includes placing a heating section of a heater in a horizontal or inclined section of a wellbore with an installation tool. The tool is uncoupled from the heating section. A lead in section is mechanically and electrically coupled to the heating section of the heater. The lead-in section is located in an angled or vertical section of the wellbore.

  13. 30 CFR 75.1002 - Installation of electric equipment and conductors; permissibility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... conductors; permissibility. 75.1002 Section 75.1002 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... Wires and Trolley Feeder Wires § 75.1002 Installation of electric equipment and conductors... equipment is located within 150 feet of pillar workings or longwall faces. (b) Electric conductors and...

  14. 30 CFR 75.1002 - Installation of electric equipment and conductors; permissibility.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... conductors; permissibility. 75.1002 Section 75.1002 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... Wires and Trolley Feeder Wires § 75.1002 Installation of electric equipment and conductors... equipment is located within 150 feet of pillar workings or longwall faces. (b) Electric conductors and...

  15. 30 CFR 250.802 - Design, installation, and operation of surface production-safety systems.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Production Platform Piping Systems (as incorporated by reference in § 250.198). (4) Electrical system... classified according to API RP 500, Recommended Practice for Classification of Locations for Electrical..., Recommended Practice for Classification of Locations for Electrical Installations at Petroleum Facilities...

  16. 30 CFR 250.802 - Design, installation, and operation of surface production-safety systems.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Production Platform Piping Systems (as incorporated by reference in § 250.198). (4) Electrical system... classified according to API RP 500, Recommended Practice for Classification of Locations for Electrical..., Recommended Practice for Classification of Locations for Electrical Installations at Petroleum Facilities...

  17. 30 CFR 250.802 - Design, installation, and operation of surface production-safety systems.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Production Platform Piping Systems (as incorporated by reference in § 250.198). (4) Electrical system... classified according to API RP 500, Recommended Practice for Classification of Locations for Electrical..., Recommended Practice for Classification of Locations for Electrical Installations at Petroleum Facilities...

  18. 46 CFR 38.15-15 - Electrical installations-TB/ALL.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... this chapter for tank vessels, except as otherwise specified in this part. (b) Spaces containing cargo... devices, except Coast Guard approved intrinsically safe devices, shall be installed in these spaces. Electric motors shall be segregated from these spaces by a gastight bulkhead. Electric lighting of the...

  19. 46 CFR 38.15-15 - Electrical installations-TB/ALL.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... this chapter for tank vessels, except as otherwise specified in this part. (b) Spaces containing cargo... devices, except Coast Guard approved intrinsically safe devices, shall be installed in these spaces. Electric motors shall be segregated from these spaces by a gastight bulkhead. Electric lighting of the...

  20. 46 CFR 38.15-15 - Electrical installations-TB/ALL.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... this chapter for tank vessels, except as otherwise specified in this part. (b) Spaces containing cargo... devices, except Coast Guard approved intrinsically safe devices, shall be installed in these spaces. Electric motors shall be segregated from these spaces by a gastight bulkhead. Electric lighting of the...

  1. 46 CFR 38.15-15 - Electrical installations-TB/ALL.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... this chapter for tank vessels, except as otherwise specified in this part. (b) Spaces containing cargo... devices, except Coast Guard approved intrinsically safe devices, shall be installed in these spaces. Electric motors shall be segregated from these spaces by a gastight bulkhead. Electric lighting of the...

  2. 46 CFR 38.15-15 - Electrical installations-TB/ALL.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... this chapter for tank vessels, except as otherwise specified in this part. (b) Spaces containing cargo... devices, except Coast Guard approved intrinsically safe devices, shall be installed in these spaces. Electric motors shall be segregated from these spaces by a gastight bulkhead. Electric lighting of the...

  3. Engineering study of the module/array interface for large terrestrial photovoltaic arrays

    NASA Technical Reports Server (NTRS)

    1977-01-01

    Three major areas--structural, electrical, and maintenance--were evaluated. Efforts in the structural area included establishing acceptance criteria for materials and members, determining loading criteria, and analyzing glass modules in various framing system configurations. Array support structure design was addressed briefly. Electrical considerations included evaluation of module characteristics, intermodule connectors, array wiring, converters and lightning protection. Plant maintenance features such as array cleaning, failure detection, and module installation and replacement were addressed.

  4. Installation Restoration Program Records Search for 132 Tactical Fighter Wing, Iowa Air National Guard, Des Moines Municipal Airport.

    DTIC Science & Technology

    1983-09-01

    underlain by soils of the Gravity series and " of the Wabash -Gravity-Nodaway complex. These soils, primarily silty clay loams, are formed in fine...Electric Shop The electric shop is located in Facility No. 100. Wastes generated from this area include nickel- S cadmium batteries (24/year) and sulfuric

  5. The Effect of Particles on Electrolytically Polymerized Thin Natural MCF Rubber for Soft Sensors Installed in Artificial Skin.

    PubMed

    Shimada, Kunio; Mochizuki, Osamu; Kubota, Yoshihiro

    2017-04-19

    The aim of this study is to investigate the effect of particles as filler in soft rubber sensors installed in artificial skin. We examine sensors made of natural rubber (NR-latex) that include magnetic particles of Ni and Fe₃O₄ using magnetic compound fluid (MCF). The 1-mm thickness of the electrolytically polymerized MCF rubber makes production of comparatively thin rubber sensors feasible. We first investigate the effect of magnetic particles Ni and Fe₃O₄ on the curing of MCF rubber. Next, in order to adjust the electric properties of the MCF rubber, we adopt Al₂O₃ dielectric particles. We investigate the effect of Al₂O₃ particles on changes in electric current, voltage and temperature of electrolytically polymerized MCF rubber liquid, and on the electric properties under the application of normal and shear forces. By adjusting the ratio of Ni, Fe₃O₄, Al₂O₃ and water in MCF rubber with Al₂O₃, it is possible to change the electric properties.

  6. Smart Grid Enabled EVSE

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    2015-01-12

    The combined team of GE Global Research, Federal Express, National Renewable Energy Laboratory, and Consolidated Edison has successfully achieved the established goals contained within the Department of Energy’s Smart Grid Capable Electric Vehicle Supply Equipment funding opportunity. The final program product, shown charging two vehicles in Figure 1, reduces by nearly 50% the total installed system cost of the electric vehicle supply equipment (EVSE) as well as enabling a host of new Smart Grid enabled features. These include bi-directional communications, load control, utility message exchange and transaction management information. Using the new charging system, Utilities or energy service providers willmore » now be able to monitor transportation related electrical loads on their distribution networks, send load control commands or preferences to individual systems, and then see measured responses. Installation owners will be able to authorize usage of the stations, monitor operations, and optimally control their electricity consumption. These features and cost reductions have been developed through a total system design solution.« less

  7. Third World PVs hit the roof.

    PubMed

    Lenssen, N

    1992-01-01

    Rural areas in developing countries have no hope of benefiting from electricity generation programs because of a lack of resources. Currently the common practice is to use kerosene lamps for light, disposable batteries for radios, and auto batteries for television. The auto battery must be hauled by pack animal to a charging station. An alternative that is growing in popularity is the installation of photovoltaic (PV) systems in each house. The advantages include very low operating costs (sunshine is free), long life (PV cells last 20 years), they can be installed in any home without regard for power grids. The biggest disadvantage is very high initial cost. To solve this problem many programs have been developed to finance systems. Enersol Associates started with $10,000 seed money and developed a loan program that has helped bring electricity to 1500 homes in the Dominican Republic. The Solar Electric Light and Fund started with $150,000 and has brought electricity to 3500 homes in Sri Lanka. The United Nations Development Program gave $7 million to Zimbabwe to fund a project that is expected to bring electricity to 20,000 homes over the next 5 years.

  8. 40 CFR 98.452 - GHGs to report.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... must report SF6 and PFC emissions at the facility level. Annual emissions from the facility must include SF6 and PFC emissions from equipment that is installed at an off-site electric power transmission...

  9. 40 CFR 98.452 - GHGs to report.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... must report SF6 and PFC emissions at the facility level. Annual emissions from the facility must include SF6 and PFC emissions from equipment that is installed at an off-site electric power transmission...

  10. 40 CFR 98.452 - GHGs to report.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... must report SF6 and PFC emissions at the facility level. Annual emissions from the facility must include SF6 and PFC emissions from equipment that is installed at an off-site electric power transmission...

  11. Port of Los Angeles: Off-Road Heavy Duty Equipment and Infrastructure Enhancements

    EPA Pesticide Factsheets

    Description of a project at the Port of Los Angeles to replace a diesel crane with an electric crane. Additionally includes information on shore power installation, and cargo handling equipment upgrades.

  12. 78 FR 57253 - Airworthiness Directives; Honeywell ASCa Inc. Emergency Locator Transmitters Installed on Various...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-18

    ... detect and correct discrepancies of the battery wiring installation inside the TU, which could result in... TUs revealed battery wiring installation discrepancies inside the TU that may result in an electrical short. The AAIB noted that in case of an electrical short, the ELT battery could provide the energy for...

  13. Easily installable behavioral monitoring system with electric field sensor.

    PubMed

    Tsukamoto, Sosuke; Machida, Yuichiro; Kameda, Noriyuki; Hoshino, Hiroshi; Tamura, Toshiyo

    2007-01-01

    This paper describes a wireless behavioral monitoring system equipped with an electric field sensor. The sensor unit was designed to obtain information regarding the usage of home electric appliances such as the television, microwave oven, coffee maker, etc. by measuring the electric field surrounding them. It is assumed that these usage statistics could provide information regarding the indoor behavior of a subject. Since the sensor can be used by simply attaching it to an appliance and does not require any wiring for its installation, this system can be temporarily installed in any ordinary house. A simple interface for selecting the threshold value of appliances' power on/off states was introduced. The experimental results reveal that the proposed system can be installed by individuals in their residences in a short time and the usage statistics of home appliances can be gathered.

  14. Using Photovoltaic (PV) Cells on Enduring DoD Installations in the Middle East: A Feasibility Study

    DTIC Science & Technology

    2013-06-01

    geothermal , and biomass). In FY 2009, 3.6 percent of the DoD’s electrical consumption came from renewable electricity sources, exceeding the EP Act 2005...defined as electrical energy generated from solar, wind, biomass, landfill gas, ocean (including tidal, wave, current, and thermal), geothermal ...involving solar, wind, geothermal and biomass energy. The U.S. Navy accounts for 60 percent of DoD’s renewable energy projects—some 250 in total. The 14

  15. KSC-01pp0244

    NASA Image and Video Library

    2001-02-03

    The lid is off the shipping container with the Multi-Purpose Logistics Module Donatello inside. It sits on a transporter inside the Space Station Processing Facility. In the SSPF, Donatello will undergo processing by the payload test team, including integrated electrical tests with other Station elements in the SSPF, leak tests, electrical and software compatibility tests with the Space Shuttle (using the Cargo Integrated Test equipment) and an Interface Verification Test once the module is installed in the Space Shuttle’s payload bay at the launch pad. The most significant mechanical task to be performed on Donatello in the SSPF is the installation and outfitting of the racks for carrying the various experiments and cargo. Donatello will be launched on mission STS-130, currently planned for September 2004

  16. KSC-01pp0245

    NASA Image and Video Library

    2001-02-03

    Workers in the Space Station Processing Facility attach an overhead crane to the Multi-Purpose Logistics Module Donatello to lift it out of the shipping container. In the SSPF, Donatello will undergo processing by the payload test team, including integrated electrical tests with other Station elements in the SSPF, leak tests, electrical and software compatibility tests with the Space Shuttle (using the Cargo Integrated Test equipment) and an Interface Verification Test once the module is installed in the Space Shuttle’s payload bay at the launch pad. The most significant mechanical task to be performed on Donatello in the SSPF is the installation and outfitting of the racks for carrying the various experiments and cargo. Donatello will be launched on mission STS-130, currently planned for September 2004

  17. KSC-01pp0246

    NASA Image and Video Library

    2001-02-03

    In the Space Station Processing Facility, workers help guide the overhead crane as it lifts the Multi-Purpose Logistics Module Donatello out of the shipping container. In the SSPF, Donatello will undergo processing by the payload test team, including integrated electrical tests with other Station elements in the SSPF, leak tests, electrical and software compatibility tests with the Space Shuttle (using the Cargo Integrated Test equipment) and an Interface Verification Test once the module is installed in the Space Shuttle’s payload bay at the launch pad. The most significant mechanical task to be performed on Donatello in the SSPF is the installation and outfitting of the racks for carrying the various experiments and cargo. Donatello will be launched on mission STS-130, currently planned for September 2004

  18. KSC-01pp0247

    NASA Image and Video Library

    2001-02-03

    In the Space Station Processing Facility, workers help guide the Multi-Purpose Logistics Module Donatello as it moves the length of the SSPF toward a workstand. In the SSPF, Donatello will undergo processing by the payload test team, including integrated electrical tests with other Station elements in the SSPF, leak tests, electrical and software compatibility tests with the Space Shuttle (using the Cargo Integrated Test equipment) and an Interface Verification Test once the module is installed in the Space Shuttle’s payload bay at the launch pad. The most significant mechanical task to be performed on Donatello in the SSPF is the installation and outfitting of the racks for carrying the various experiments and cargo. Donatello will be launched on mission STS-130, currently planned for September 2004

  19. KSC-01pp0248

    NASA Image and Video Library

    2001-02-03

    In the Space Station Processing Facility, workers wait for the Multi-Purpose Logistics Module Donatello, suspended by an overhead crane, to move onto a workstand. In the SSPF, Donatello will undergo processing by the payload test team, including integrated electrical tests with other Station elements in the SSPF, leak tests, electrical and software compatibility tests with the Space Shuttle (using the Cargo Integrated Test equipment) and an Interface Verification Test once the module is installed in the Space Shuttle’s payload bay at the launch pad. The most significant mechanical task to be performed on Donatello in the SSPF is the installation and outfitting of the racks for carrying the various experiments and cargo. Donatello will be launched on mission STS-130, currently planned for September 2004

  20. A novel approach for evaluating the impact of fixed variables on photovoltaic (PV) solar installations using enhanced meta data analysis among higher education institutions in the United States

    NASA Astrophysics Data System (ADS)

    De Hoyos, Diane N.

    The global demand for electric energy has continuously increased over the last few decades. Some mature, alternative generation methods are wind, power, photovoltaic panels, biogas and fuel cells. In order to find alternative sources of energy to aid in the reduction of our nation's dependency on non-renewable fuels, energy sources include the use of solar energy panels. The intent of these initiatives is to provide substantial energy savings and reduce dependence on the electrical grid and net metering savings during the peak energy-use hours. The focus of this study explores and provides a clearer picture of the adoption of solar photovoltaic technology in institutions of higher education. It examines the impact of different variables associated with a photovoltaic installation in an institutions of higher education in the United States on the production generations for universities. Secondary data was used with permission from the Advancement of Suitability in Higher Education (AASHE). A multiple regression analysis was performed to determine the impact of different variables on the energy generation production. A Meta Data transformation analysis offered a deeper investigation into the impact of the variables on the photovoltaic installations. Although a review of a significant number of journal articles, dissertations and thesis in the area of photovoltaic solar installations are available, there were limited studies of actual institutions of higher education with the significant volume of institutions. However a study where the database included a significant number of data variables is unique and provides a researcher the opportunity to investigate different facets of a solar installation. The data of the installations ranges from 1993-2015. Included in this observation are the researcher's experience both in the procurement industry and as a team member of a solar institution of higher education in the southern portion of the United States.

  1. Developing infrastructure for interconnecting transportation network and electric grid.

    DOT National Transportation Integrated Search

    2011-09-01

    This report is primarily focused on the development of mathematical models that can be used to : support decisions regarding a charging station location and installation problem. The major parts : of developing the models included identification of t...

  2. 47 CFR 24.243 - The cost-sharing formula.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...; monitoring or control equipment; engineering costs (design/path survey); installation; systems testing; FCC... control; power plant upgrade (if required); electrical grounding systems; Heating Ventilation and Air Conditioning (HVAC) (if required); alternate transport equipment; and leased facilities. C also includes...

  3. 47 CFR 24.243 - The cost-sharing formula.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...; monitoring or control equipment; engineering costs (design/path survey); installation; systems testing; FCC... control; power plant upgrade (if required); electrical grounding systems; Heating Ventilation and Air Conditioning (HVAC) (if required); alternate transport equipment; and leased facilities. C also includes...

  4. 47 CFR 24.243 - The cost-sharing formula.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...; monitoring or control equipment; engineering costs (design/path survey); installation; systems testing; FCC... control; power plant upgrade (if required); electrical grounding systems; Heating Ventilation and Air Conditioning (HVAC) (if required); alternate transport equipment; and leased facilities. C also includes...

  5. 47 CFR 24.243 - The cost-sharing formula.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...; monitoring or control equipment; engineering costs (design/path survey); installation; systems testing; FCC... control; power plant upgrade (if required); electrical grounding systems; Heating Ventilation and Air Conditioning (HVAC) (if required); alternate transport equipment; and leased facilities. C also includes...

  6. Key issues for low-cost FGD installations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DePriest, W.; Mazurek, J.M.

    1995-12-01

    This paper will discuss various methods for installing low-cost FGD systems. The paper will include a discussion of various types of FGD systems available, both wet and dry, and will compare the relative cost of each type. Important design issues, such as use of spare equipment, materials of construction, etc. will be presented. An overview of various low-cost construction techniques (i.e., modularization) will be included. This paper will draw heavily from Sargent & Lundy`s database of past and current FGD projects together with information we gathered for several Electric Power Research Institute (EPRI) studies on the subject.

  7. 14 CFR 25.1309 - Equipment, systems, and installations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Equipment General § 25.1309... electrical system and equipment design and installation, critical environmental conditions must be considered. For electrical generation, distribution, and utilization equipment required by or used in complying...

  8. Installation of a second superconducting wiggler at SAGA-LS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kaneyasu, T., E-mail: kaneyasu@saga-ls.jp; Takabayashi, Y.; Iwasaki, Y.

    The SAGA Light Source is a synchrotron radiation facility consisting of a 255 MeV injector linac and a 1.4 GeV storage ring with a circumference of 75.6 m. A superconducting wiggler (SCW) with a peak magnetic field of 4 T has been routinely operating for generating hard X-rays since its installation in 2010. In light of this success, it was decided to install a second SCW as a part of the beamline construction by Sumitomo Electric Industries. To achieve this, machine modifications including installation of a new magnet power supply, improvement of the magnet control system, and replacement of themore » vacuum chambers in the storage ring were carried out. Along with beamline construction, installation and commissioning of the second SCW are scheduled to take place in 2015.« less

  9. Update on the Puerto Rico Electric Power Authority`s spinning reserve battery system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Taylor, P.A.

    1996-11-01

    The Puerto Rico Electric Power Authority completed start-up testing and began commercial operation of a 20MW/14MWh battery energy storage facility in April 1995. The battery system was installed to provide rapid spinning reserve and frequency control for the utility`s island electrical system. This paper outlines the needs of an island utility for rapid spinning reserve; identifies Puerto Rico`s unique challenges; reviews the technical and economic analyses that justified installation of a battery energy system; describes the storage facility that was installed; and presents preliminary operating results of the facility.

  10. Integration& Operation of a Microgrid at Santa Rita Jail

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chevron Energy Solutions; Alameda County; DeForest, Nicholas

    2011-05-01

    Santa Rita Jail is a 4,500 inmate facility located in Dublin CA, approximately 40 miles (65 km) east of San Francisco. Over the past decade, a series of Distributed Energy Resources (DER) installations and efficiency measures have been undertaken to transform the 3MW facility into a"Green Jail". These include a 1.2MW rated rooftop PV system installed in 2002, a 1MW molten carbonate fuel cell with CHP, and retrofits to lighting and HVAC systems to reduce peak loads. With the upcoming installation of a large-scale battery and fast static disconnect switch, Santa Rita Jail will become a true microgrid, with fullmore » CERTS Microgrid functionality. Consequently, the jail will be able to seamlessly disconnect from the grid and operate as an island in the event of a disturbance, reconnecting again once the disturbance has dissipated. The extent to which that jail is capable of islanding is principally dependant on the energy capacity of the battery-one focus of this investigation. Also presented here are overviews of the DER currently installed at the jail, as well as the value it provides by offsetting the purchase of electricity under the current Pacific Gas& Electric (PG&E) tariff.« less

  11. Assessing the Future of Distributed Wind: Opportunities for Behind-the-Meter Projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lantz, Eric; Sigrin, Benjamin; Gleason, Michael

    2016-11-01

    Wind power is one of the fastest growing sources of new electricity generation in the United States. Cumulative installed capacity was more than 74,000 megawatts (MW) at year-end 2015 and wind power supplied 4.7% of total 2015 U.S. electricity generation. Despite the growth of the wind power industry, the distributed wind market has remained limited. Cumulative installations of distributed wind through 2015 totaled 934 MW. This first-of-a-kind exploratory analysis characterizes the future opportunity for behind-the-meter distributed wind, serving primarily rural or suburban homes, farms, and manufacturing facilities. This work focuses only on the grid-connected, behind-the-meter subset of the broader distributedmore » wind market. We estimate this segment to be approximately half of the 934 MW of total installed distributed wind capacity at year-end 2015. Potential from other distributed wind market segments including systems installed in front of the meter (e.g., community wind) and in remote, off-grid locations is not assessed in this analysis and therefore, would be additive to results presented here. These other distributed wind market segments are not considered in this initial effort because of their relatively unique economic and market attributes.« less

  12. The Effect of Particles on Electrolytically Polymerized Thin Natural MCF Rubber for Soft Sensors Installed in Artificial Skin

    PubMed Central

    Shimada, Kunio; Mochizuki, Osamu; Kubota, Yoshihiro

    2017-01-01

    The aim of this study is to investigate the effect of particles as filler in soft rubber sensors installed in artificial skin. We examine sensors made of natural rubber (NR-latex) that include magnetic particles of Ni and Fe3O4 using magnetic compound fluid (MCF). The 1-mm thickness of the electrolytically polymerized MCF rubber makes production of comparatively thin rubber sensors feasible. We first investigate the effect of magnetic particles Ni and Fe3O4 on the curing of MCF rubber. Next, in order to adjust the electric properties of the MCF rubber, we adopt Al2O3 dielectric particles. We investigate the effect of Al2O3 particles on changes in electric current, voltage and temperature of electrolytically polymerized MCF rubber liquid, and on the electric properties under the application of normal and shear forces. By adjusting the ratio of Ni, Fe3O4, Al2O3 and water in MCF rubber with Al2O3, it is possible to change the electric properties. PMID:28422061

  13. U.S. Solar Photovoltaic System Cost Benchmark: Q1 2017

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fu, Ran; Feldman, David; Margolis, Robert

    This report benchmarks U.S. solar photovoltaic (PV) system installed costs as of the first quarter of 2017 (Q1 2017). We use a bottom-up methodology, accounting for all system and projectdevelopment costs incurred during the installation to model the costs for residential, commercial, and utility-scale systems. In general, we attempt to model the typical installation techniques and business operations from an installed-cost perspective. Costs are represented from the perspective of the developer/installer; thus, all hardware costs represent the price at which components are purchased by the developer/installer, not accounting for preexisting supply agreements or other contracts. Importantly, the benchmark also representsmore » the sales price paid to the installer; therefore, it includes profit in the cost of the hardware, 1 along with the profit the installer/developer receives, as a separate cost category. However, it does not include any additional net profit, such as a developer fee or price gross-up, which is common in the marketplace. We adopt this approach owing to the wide variation in developer profits in all three sectors, where project pricing is highly dependent on region and project specifics such as local retail electricity rate structures, local rebate and incentive structures, competitive environment, and overall project or deal structures. Finally, our benchmarks are national averages weighted by state installed capacities.« less

  14. Financial Optimization of Electricity Security Assets at Military Installations: Including Case Studies of Dover Air Force Base, Fort Benning, and MCAGCC Twentynine Palms

    DTIC Science & Technology

    2014-01-01

    kW) and Energy (kWh) Charges, Including Time-of-Use Energy Charges X X X X X Power Factor Improvement X X Emergency Demand Response... Capacity Market) X X X X X Other Capacity Sales X X X Frequency Regulation X X X X Spinning/Synchronous Reserve X X Blackstart Capacity X X X...Policy, Organizational, and Other Factors that can Accelerate Prudent Electricity Security Asset Investments and Uses 0% 2% 4% 6% 8% 10% 12% 14% 16

  15. Center background shows two fortyhorsepower directcurrent electric motors installed in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Center background shows two forty-horsepower direct-current electric motors installed in 1904 to provide power to two drive shafts for first floor machine shops. - Thomas A. Edison Laboratories, Building No. 5, Main Street & Lakeside Avenue, West Orange, Essex County, NJ

  16. Identification of ergonomics interventions used to reduce musculoskeletal loading for building installation tasks.

    PubMed

    Albers, Jim; Estill, Cherie; MacDonald, Leslie

    2005-07-01

    Skilled workers in the mechanical and electrical installation (M/EI) building and construction trades experience high rates of disabling work-related musculoskeletal disorders (WMSDs). The M/EI trades involve installing piping; heating, ventilation and air conditioning (HVAC), and electrical systems in residential, commercial, and industrial buildings. In the absence of an ergonomics standard in the United States, some building and construction contractors, including M/EI sector contractors, have implemented various ergonomics interventions on their worksites on a voluntary basis. However, no data were available to determine the type of voluntary control measures being implemented, the task-specific hazards for which control measures needed to be developed or refined, and perceived barriers to improving hazard control. As part of a larger effort to obtain this data, the National Institute for Occupational Safety and Health (NIOSH) organized a stakeholder meeting to gather information regarding ergonomics interventions or "best practices" by M/EI contractors and tradespeople. The attendees included 39 industry representatives, 17 construction ergonomics researchers from government and academia, and four ergonomics consultants with experience in the construction industry. Participants spent more than 50% of time meeting in small trade-specific breakout sessions. According to the participants, tasks common to the three trades included (1) drill holes and shoot fasteners; (2) place and install systems, and (3) lift and carry materials and equipment. Engineering interventions described in the stakeholder meeting included tools, equipment, and engineered building materials; administrative controls largely consisted of training and education programs and modifications of work and management practice. Most participants believed that there were significant limits to the impact individual contractors and tradespeople could have in leading ergonomics improvement in the building and construction industry.

  17. 46 CFR 183.392 - Radiotelephone installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.392 Radiotelephone installations. A separate circuit, with overcurrent protection at the main distribution panel, must be provided...

  18. 46 CFR 183.392 - Radiotelephone installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.392 Radiotelephone installations. A separate circuit, with overcurrent protection at the main distribution panel, must be provided...

  19. 46 CFR 183.392 - Radiotelephone installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.392 Radiotelephone installations. A separate circuit, with overcurrent protection at the main distribution panel, must be provided...

  20. Installed Base Registration of Decentralised Solar Panels with Applications in Crisis Management

    NASA Astrophysics Data System (ADS)

    Aarsen, R.; Janssen, M.; Ramkisoen, M.; Biljecki, F.; Quak, W.; Verbree, E.

    2015-08-01

    In case of a calamity in the Netherlands - e.g. a dike breach - parts of the nationwide electric network can fall out. In these occasions it would be useful if decentralised energy sources of the Smart Grid would contribute to balance out the fluctuations of the energy network. Decentralised energy sources include: solar energy, wind energy, combined heat and power, and biogas. In this manner, parts of the built environment - e.g. hospitals - that are in need of a continuous power flow, could be secured of this power. When a calamity happens, information about the Smart Grid is necessary to control the crisis and to ensure a shared view on the energy networks for both the crisis managers and network operators. The current situation of publishing, storing and sharing data of solar energy has been shown a lack of reliability about the current number, physical location, and capacity of installed decentralised photovoltaic (PV) panels in the Netherlands. This study focuses on decentralised solar energy in the form of electricity via PV panels in the Netherlands and addresses this challenge by proposing a new, reliable and up-to-date database. The study reveals the requirements for a registration of the installed base of PV panels in the Netherlands. This new database should serve as a replenishment for the current national voluntary registration, called Production Installation Register of Energy Data Services Netherland (EDSN-PIR), of installed decentralised PV panel installations in the Smart Grid, and provide important information in case of a calamity.

  1. 46 CFR 183.354 - Battery installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely...

  2. 46 CFR 183.354 - Battery installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely...

  3. 46 CFR 183.354 - Battery installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely...

  4. 46 CFR 183.354 - Battery installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely...

  5. 46 CFR 183.354 - Battery installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely...

  6. Simulation study on electric field intensity above train roof

    NASA Astrophysics Data System (ADS)

    Fan, Yizhe; Li, Huawei; Yang, Shasha

    2018-04-01

    In order to understand the distribution of electric field in the space above the train roof accurately and select the installation position of the detection device reasonably, in this paper, the 3D model of pantograph-catenary is established by using SolidWorks software, and the spatial electric field distribution of pantograph-catenary model is simulated based on Comsol software. According to the electric field intensity analysis within the 0.4m space above train roof, we give a reasonable installation of the detection device.

  7. 46 CFR 116.610 - Ventilation ducts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... incidental to its installation, must be made of noncombustible material. (c) Combustibles and other foreign materials are not allowed within ventilation ducts. However, metal piping and electrical wiring installed in... the wiring does not interfere with the operation of fire dampers. Electrical wiring and piping may not...

  8. The Logistics Of Installing Pacs In An Existing Medical Center

    NASA Astrophysics Data System (ADS)

    Saarinen, Allan O.; Goodsitt, Mitchell M.; Loop, John W.

    1989-05-01

    A largely overlooked issue in the Picture Archiving and Communication Systems (PACS) area is the tremendous amount of site planning activity required to install such a system in an existing medical center. Present PACS equipment requires significant hospital real estate, specialized electrical power, cabling, and environmental controls to operate properly. Marshaling the hospital resources necessary to install PACS equipment requires many different players. The site preparation costs are nontrivial and usually include a number of hidden expenses. This paper summarizes the experience of the University of Washington Department of Radiology in installing an extensive digital imaging network (DIN) and PACS throughout the Department and several clinics in the hospital. The major logistical problems encountered at the University are discussed, a few recommendations are made, and the installation costs are documented. Overall, the University's site preparation costs equalled about seven percent (7%) of the total PACS equipment expenditure at the site.

  9. Alternative Fuels Data Center: Raleigh, North Carolina, Paves the Way for

    Science.gov Websites

    of North Carolina at Chapel Hill. It's no surprise that Raleigh is a leader in PEV deployment as well charging on the electrical grid; implementing a three-year load research project that included installing requirements, including load calculations and a detailed plan review. For more information, visit the city's

  10. Development and Implementation of a Battery-Electric Light-Duty Class 2a Truck including Hybrid Energy Storage

    NASA Astrophysics Data System (ADS)

    Kollmeyer, Phillip J.

    This dissertation addresses two major related research topics: 1) the design, fabrication, modeling, and experimental testing of a battery-electric light-duty Class 2a truck; and 2) the design and evaluation of a hybrid energy storage system (HESS) for this and other vehicles. The work begins with the determination of the truck's peak power and wheel torque requirements (135kW/4900Nm). An electric traction system is then designed that consists of an interior permanent magnet synchronous machine, two-speed gearbox, three-phase motor drive, and LiFePO4 battery pack. The battery pack capacity is selected to achieve a driving range similar to the 2011 Nissan Leaf electric vehicle (73 miles). Next, the demonstrator electric traction system is built and installed in the vehicle, a Ford F150 pickup truck, and an extensive set of sensors and data acquisition equipment is installed. Detailed loss models of the battery pack, electric traction machine, and motor drive are developed and experimentally verified using the driving data. Many aspects of the truck's performance are investigated, including efficiency differences between the two-gear configuration and the optimal gear selection. The remainder focuses on the application of battery/ultracapacitor hybrid energy storage systems (HESS) to electric vehicles. First, the electric truck is modeled with the addition of an ultracapacitor pack and a dc/dc converter. Rule-based and optimal battery/ultracapacitor power-split control algorithms are then developed, and the performance improvements achieved for both algorithms are evaluated for operation at 25°C. The HESS modeling is then extended to low temperatures, where battery resistance increases substantially. To verify the accuracy of the model-predicted results, a scaled hybrid energy storage system is built and the system is tested for several drive cycles and for two temperatures. The HESS performance is then modeled for three variants of the vehicle design, including the prototype electric truck with a different battery pack, the prototype electric truck with a higher power drivetrain and higher towing capability, and an electric city transit bus. Performance advantages provided by the HESS are demonstrated and verified for these vehicles in several areas including: longer vehicle range, improved low-temperature operation with lithium-ion batteries, and reduced battery losses and cycling stresses.

  11. Aerodynamic stability analysis of NASA J85-13/planar pressure pulse generator installation

    NASA Technical Reports Server (NTRS)

    Chung, K.; Hosny, W. M.; Steenken, W. G.

    1980-01-01

    A digital computer simulation model for the J85-13/Planar Pressure Pulse Generator (P3 G) test installation was developed by modifying an existing General Electric compression system model. This modification included the incorporation of a novel method for describing the unsteady blade lift force. This approach significantly enhanced the capability of the model to handle unsteady flows. In addition, the frequency response characteristics of the J85-13/P3G test installation were analyzed in support of selecting instrumentation locations to avoid standing wave nodes within the test apparatus and thus, low signal levels. The feasibility of employing explicit analytical expression for surge prediction was also studied.

  12. A Planning Guide for Instructional Networks, Part II.

    ERIC Educational Resources Information Center

    Daly, Kevin F.

    1994-01-01

    This second in a series of articles on planning for instructional computer networks focuses on site preparation, installation, service, and support. Highlights include an implementation schedule; classroom and computer lab layouts; electrical power needs; workstations; network cable; telephones; furniture; climate control; and security. (LRW)

  13. 77 FR 20511 - Airworthiness Directives; The Boeing Company Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-05

    ... heat damage to the inner wall of the thrust reversers, which could result in separation of adjacent... the upper and lower inner wall insulation blankets, measuring the electrical conductivity on the..., doing various concurrent actions (including replacing the inner wall blanket insulation, installing...

  14. 40 CFR 51.308 - Regional haze program requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... for fossil-fuel fired power plants having a total generating capacity greater than 750 megawatts must...-eligible fossil fuel-fired steam electric plants in the State to install, operate, and maintain BART for... fossil fuel-fired steam electric plants in the State to install, operate, and maintain BART for the...

  15. 40 CFR 51.308 - Regional haze program requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... for fossil-fuel fired power plants having a total generating capacity greater than 750 megawatts must...-eligible fossil fuel-fired steam electric plants in the State to install, operate, and maintain BART for... fossil fuel-fired steam electric plants in the State to install, operate, and maintain BART for the...

  16. Power game needs risk-free approach.

    PubMed

    Baillie, Jonathan

    2011-05-01

    A detailed look at the latest regulations, legislation, and guidance governing electrical services and installations in healthcare was given by Richard Knight, director of professional estates and facilities business consultancy, CPA Solutions, at a recent IHEEM seminar, "Electrical installation guidance for healthcare premises", in London. HEJ editor Jonathan Baillie reports.

  17. 77 FR 47273 - Airworthiness Directives; Airbus Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-08

    ... the autopilot electrical wiring conduit and the wing bottom skin. This AD requires modifying the wiring installation on the right-hand wing. We are issuing this AD to prevent sparking due to electrical... above, this [EASA] AD requires modification of the wiring installation to improve the routing and the...

  18. 30 CFR 77.511 - Danger signs at electrical installations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Danger signs at electrical installations. 77.511 Section 77.511 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF...

  19. DOD fuel cell demonstration program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Holcomb, F.H.; Binder, M.J.; Taylor, W.R.

    The supply of reliable, cost-effective electric power with minimal environmental impact is a constant concern of Department of Defense (DOD) installation energy personnel. Electricity purchased from the local utility is expensive and represents only about 30% of the original energy input at the generating station due to generation and distribution inefficiencies. Because of master metering and large air conditioning loads, the demand portion of the installation`s electric bill can be in excess of 50% of the total bill. While the electric utilities in the United States have a very good record of reliability, there is significant potential for improving themore » security of electrical power supplied by using on-site power generation. On-site, dispersed power generation can reduce power outages due to weather, terrorist activities, or lack of utility generating capacity. In addition, as increased emphasis is placed on global warming, acid rain, and air pollution in general, the development of clean, highly efficient power producing technologies is not only desirable, but mandatory. Since the majority of central heat plants on U.S. military installations are nearing the end of their useful life, there is an opportunity to replace outdated existing equipment with modem technologies.« less

  20. 29 CFR 1910.331 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... or no such training) working on, near, or with the following installations: (1) Premises wiring. Installations of electric conductors and equipment within or on buildings or other structures, and on other... wiring. Installations of other outside conductors on the premises. (4) Optical fiber cable. Installations...

  1. Proceedings of Small Power Systems Solar Electric Workshop. Volume 2: Invited papers

    NASA Technical Reports Server (NTRS)

    Ferber, R. (Editor)

    1978-01-01

    The focus of this work shop was to present the committment to the development of solar thermal power plants for a variety of applications including utility applications. Workshop activities included panel discussions, formal presentations, small group interactive discussions, question and answer periods, and informal gatherings. Discussion on topics include: (1) solar power technology options; (2) solar thermal power programs currently underway at the DOE, JPL, Electric Power Research Institute (EPRI), and Solar Energy Research Institute (SERI); (3) power options competing with solar; (4) institutional issues; (5) environmental and siting issues; (6) financial issues; (7) energy storage; (8) site requirements for experimental solar installations, and (9) utility planning.

  2. Defense Infrastructure: Improvements in DOD Reporting and Cybersecurity Implementation Needed to Enhance Utility Resilience Planning

    DTIC Science & Technology

    2015-07-01

    which were multiday electrical disruptions that occurred as a result of the June 2012 derecho storm, including a disruption at Marine Corps Base...we learned about were a multiday wastewater disruption at Fort Shafter and two electrical disruptions at Aberdeen Proving Ground. 35A derecho is a...D.C.: Jan. 31, 2014). At least seven Marine Corps and Navy installations experienced disruptions as a result of the derecho storm. They are Marine

  3. A TDR-Based Soil Moisture Monitoring System with Simultaneous Measurement of Soil Temperature and Electrical Conductivity

    PubMed Central

    Skierucha, Wojciech; Wilczek, Andrzej; Szypłowska, Agnieszka; Sławiński, Cezary; Lamorski, Krzysztof

    2012-01-01

    Elements of design and a field application of a TDR-based soil moisture and electrical conductivity monitoring system are described with detailed presentation of the time delay units with a resolution of 10 ps. Other issues discussed include the temperature correction of the applied time delay units, battery supply characteristics and the measurement results from one of the installed ground measurement stations in the Polesie National Park in Poland. PMID:23202009

  4. High tension electricity burns: a case report.

    PubMed

    Asuquo, M E; Okpokam, O; Mwagbara, V

    2006-06-01

    Recently in some areas there has been an upsurge in rural electrification. Though electricity is desirable, it is one of the most potentially dangerous commodities in the society. We present this report highlighting the need for prevention as high tension electricity injury though uncommon is reputed for significant morbidity and mortality. A case report of a 30 year old female trader with high tension electricity burns in a rural community seen in the University of Calabar Teaching Hospital, Calabar. Successful management of 10% burn involving multiple sites. Patient's husband was electrocuted in the incident. High tension burns are reputed for significant morbidity and mortality hence the need for prevention. Strategies recommended should include safety of electrical installations, protective apparels for electricity workers as well as health education for consumers.

  5. Turbokon scientific and production implementation company—25 years of activity

    NASA Astrophysics Data System (ADS)

    Favorskii, O. N.; Leont'ev, A. I.; Milman, O. O.

    2016-05-01

    The main results of studies performed at ZAO Turbokon NPVP in cooperation with leading Russian scientific organizations during 25 years of its activity in the field of development of unique ecologically clean electric power and heat production technologies are described. They include the development and experimental verification using prototypes and full-scale models of highly efficient air-cooled condensers for steam turbines, a high temperature gas steam turbine for stationary and transport power engineering, a nonfuel technology of electric power production using steam turbine installations with a unit power of 4-20 MW at gas-main pipelines and industrial boiler houses and heat stations. The results of efforts in the field of reducing vibroactivity of power equipment for transport installations are given. Basic directions of further research for increasing the efficiency and ecological safety of home power engineering are discussed.

  6. 24 CFR 3280.811 - Calculations.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... motors and heater loads (exhaust fans, air conditioners, electric, gas, or oil heating). Omit smaller of air conditioning and heating except include blower motor if used as air conditioner evaporator motor. When an air conditioner is not installed and a 40-ampere power supply cord is provided, allow 15...

  7. 16 CFR 1404.1 - Scope, application, and effective date.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... electrical light fixture or where cellulose insulation is installed too close to the exhaust flues from heat... REGULATIONS CELLULOSE INSULATION § 1404.1 Scope, application, and effective date. (a) Scope. This part 1404 establishes a requirement for manufacturers, including importers, of cellulose insulation to notify (1...

  8. 16 CFR 1404.1 - Scope, application, and effective date.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... electrical light fixture or where cellulose insulation is installed too close to the exhaust flues from heat... REGULATIONS CELLULOSE INSULATION § 1404.1 Scope, application, and effective date. (a) Scope. This part 1404 establishes a requirement for manufacturers, including importers, of cellulose insulation to notify (1...

  9. 16 CFR 1404.1 - Scope, application, and effective date.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... electrical light fixture or where cellulose insulation is installed too close to the exhaust flues from heat... REGULATIONS CELLULOSE INSULATION § 1404.1 Scope, application, and effective date. (a) Scope. This part 1404 establishes a requirement for manufacturers, including importers, of cellulose insulation to notify (1...

  10. 16 CFR 1404.1 - Scope, application, and effective date.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... electrical light fixture or where cellulose insulation is installed too close to the exhaust flues from heat... REGULATIONS CELLULOSE INSULATION § 1404.1 Scope, application, and effective date. (a) Scope. This part 1404 establishes a requirement for manufacturers, including importers, of cellulose insulation to notify (1...

  11. Business Case for Fuel Cells 2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Curtin, Sandra; Gangi, Jennifer; Benjamin, Thomas G.

    The report provides an overview of recent private sector fuel cell installations at U.S. businesses as of December 31, 2016. This list is by no means exhaustive. Over the past few decades, hundreds of thousands of fuel cells have been installed around the world, for primary or backup power, as well as in various other applications including portable and emergency backup power. Fuel cells have also been deployed in other applications such as heat and electricity for homes and apartments, material handling, passenger vehicles, buses, and remote, off-grid sites.

  12. Measure Guideline: Heat Pump Water Heaters in New and Existing Homes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shapiro, C.; Puttagunta, S.; Owens, D.

    2012-02-01

    This Building America Measure Guideline is intended for builders, contractors, homeowners, and policy-makers. This document is intended to explore the issues surrounding heat pump water heaters (HPWHs) to ensure that homeowners and contractors have the tools needed to appropriately and efficiently install HPWHs. Heat pump water heaters (HPWHs) promise to significantly reduce energy consumption for domestic hot water (DHW) over standard electric resistance water heaters (ERWHs). While ERWHs perform with energy factors (EFs) around 0.9, new HPWHs boast EFs upwards of 2.0. High energy factors in HPWHs are achieved by combining a vapor compression system, which extracts heat from themore » surrounding air at high efficiencies, with electric resistance element(s), which are better suited to meet large hot water demands. Swapping ERWHs with HPWHs could result in roughly 50% reduction in water heating energy consumption for 35.6% of all U.S. households. This Building America Measure Guideline is intended for builders, contractors, homeowners, and policy-makers. While HPWHs promise to significantly reduce energy use for DHW, proper installation, selection, and maintenance of HPWHs is required to ensure high operating efficiency and reliability. This document is intended to explore the issues surrounding HPWHs to ensure that homeowners and contractors have the tools needed to appropriately and efficiently install HPWHs. Section 1 of this guideline provides a brief description of HPWHs and their operation. Section 2 highlights the cost and energy savings of HPWHs as well as the variables that affect HPWH performance, reliability, and efficiency. Section 3 gives guidelines for proper installation and maintenance of HPWHs, selection criteria for locating HPWHs, and highlights of important differences between ERWH and HPWH installations. Throughout this document, CARB has included results from the evaluation of 14 heat pump water heaters (including three recently released HPWH products) installed in existing homes in the northeast region of the United States.« less

  13. 14 CFR 25.1703 - Function and installation: EWIS.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Function and installation: EWIS. 25.1703... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Electrical Wiring Interconnection Systems (EWIS) § 25.1703 Function and installation: EWIS. (a) Each EWIS component installed in any area of the...

  14. 46 CFR 111.05-3 - Design, construction, and installation; general.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Design, construction, and installation; general. 111.05-3 Section 111.05-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Equipment Ground, Ground Detection, and Grounded Systems § 111.05-3 Design, construction, and...

  15. 46 CFR 111.05-3 - Design, construction, and installation; general.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Design, construction, and installation; general. 111.05-3 Section 111.05-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Equipment Ground, Ground Detection, and Grounded Systems § 111.05-3 Design, construction, and...

  16. 30 CFR 250.114 - How must I install and operate electrical equipment?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... structures, and their facilities. (a) You must classify all areas according to API RP 500, Recommended... Class I, Division 1 and Division 2, or API RP 505, Recommended Practice for Classification of Locations... according to API RP 14F, Recommended Practice for Design and Installation of Electrical Systems for Fixed...

  17. Effect of Component Failures on Economics of Distributed Photovoltaic Systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lubin, Barry T.

    2012-02-02

    This report describes an applied research program to assess the realistic costs of grid connected photovoltaic (PV) installations. A Board of Advisors was assembled that included management from the regional electric power utilities, as well as other participants from companies that work in the electric power industry. Although the program started with the intention of addressing effective load carrying capacity (ELCC) for utility-owned photovoltaic installations, results from the literature study and recommendations from the Board of Advisors led investigators to the conclusion that obtaining effective data for this analysis would be difficult, if not impossible. The effort was then re-focusedmore » on assessing the realistic costs and economic valuations of grid-connected PV installations. The 17 kW PV installation on the University of Hartford's Lincoln Theater was used as one source of actual data. The change in objective required a more technically oriented group. The re-organized working group (changes made due to the need for more technically oriented participants) made site visits to medium-sized PV installations in Connecticut with the objective of developing sources of operating histories. An extensive literature review helped to focus efforts in several technical and economic subjects. The objective of determining the consequences of component failures on both generation and economic returns required three analyses. The first was a Monte-Carlo-based simulation model for failure occurrences and the resulting downtime. Published failure data, though limited, was used to verify the results. A second model was developed to predict the reduction in or loss of electrical generation related to the downtime due to these failures. Finally, a comprehensive economic analysis, including these failures, was developed to determine realistic net present values of installed PV arrays. Two types of societal benefits were explored, with quantitative valuations developed for both. Some societal benefits associated with financial benefits to the utility of having a distributed generation capacity that is not fossil-fuel based have been included into the economic models. Also included and quantified in the models are several benefits to society more generally: job creation and some estimates of benefits from avoiding greenhouse emissions. PV system failures result in a lowering of the economic values of a grid-connected system, but this turned out to be a surprisingly small effect on the overall economics. The most significant benefit noted resulted from including the societal benefits accrued to the utility. This provided a marked increase in the valuations of the array and made the overall value proposition a financially attractive one, in that net present values exceeded installation costs. These results indicate that the Department of Energy and state regulatory bodies should consider focusing on societal benefits that create economic value for the utility, confirm these quantitative values, and work to have them accepted by the utilities and reflected in the rate structures for power obtained from grid-connected arrays. Understanding and applying the economic benefits evident in this work can significantly improve the business case for grid-connected PV installations. This work also indicates that the societal benefits to the population are real and defensible, but not nearly as easy to justify in a business case as are the benefits that accrue directly to the utility.« less

  18. 30 CFR 57.12050 - Installation of trolley wires.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Installation of trolley wires. 57.12050 Section 57.12050 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... Electricity Surface and Underground § 57.12050 Installation of trolley wires. Trolley wires shall be installed...

  19. 30 CFR 57.12050 - Installation of trolley wires.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Installation of trolley wires. 57.12050 Section 57.12050 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... Electricity Surface and Underground § 57.12050 Installation of trolley wires. Trolley wires shall be installed...

  20. 30 CFR 57.12067 - Installation of transformers.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Installation of transformers. 57.12067 Section... Electricity Surface Only § 57.12067 Installation of transformers. Transformers shall be totally enclosed, or shall be placed at least 8 feet above the ground, or installed in a transformer house, or surrounded by...

  1. 30 CFR 57.12067 - Installation of transformers.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Installation of transformers. 57.12067 Section... Electricity Surface Only § 57.12067 Installation of transformers. Transformers shall be totally enclosed, or shall be placed at least 8 feet above the ground, or installed in a transformer house, or surrounded by...

  2. 30 CFR 57.12067 - Installation of transformers.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Installation of transformers. 57.12067 Section... Electricity Surface Only § 57.12067 Installation of transformers. Transformers shall be totally enclosed, or shall be placed at least 8 feet above the ground, or installed in a transformer house, or surrounded by...

  3. 30 CFR 57.12067 - Installation of transformers.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Installation of transformers. 57.12067 Section... Electricity Surface Only § 57.12067 Installation of transformers. Transformers shall be totally enclosed, or shall be placed at least 8 feet above the ground, or installed in a transformer house, or surrounded by...

  4. 30 CFR 57.12067 - Installation of transformers.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Installation of transformers. 57.12067 Section... Electricity Surface Only § 57.12067 Installation of transformers. Transformers shall be totally enclosed, or shall be placed at least 8 feet above the ground, or installed in a transformer house, or surrounded by...

  5. 46 CFR 183.200 - General design, installation, and maintenance requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false General design, installation, and maintenance requirements. 183.200 Section 183.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION General Requirements § 183.200 General design, installation, and maintenance...

  6. 46 CFR 183.200 - General design, installation, and maintenance requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false General design, installation, and maintenance requirements. 183.200 Section 183.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION General Requirements § 183.200 General design, installation, and maintenance...

  7. 46 CFR 183.200 - General design, installation, and maintenance requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false General design, installation, and maintenance requirements. 183.200 Section 183.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION General Requirements § 183.200 General design, installation, and maintenance...

  8. 46 CFR 183.200 - General design, installation, and maintenance requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false General design, installation, and maintenance requirements. 183.200 Section 183.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION General Requirements § 183.200 General design, installation, and maintenance...

  9. International energy annual 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-12-01

    The International Energy Annual presents information and trends on world energy production and consumption for petroleum, natural gas, coal, and electricity. Production and consumption data are reported in standard units as well as British thermal units (Btu). Trade and reserves are shown for petroleum, natural gas, and coal. Data are provided on crude oil refining capacity and electricity installed capacity by type. Prices are included for selected crude oils and for refined petroleum products in selected countries. Population and Gross Domestic Product data are also provided.

  10. Room Air Conditioners; Appliance Repair--Advanced: 9027.04.

    ERIC Educational Resources Information Center

    Dade County Public Schools, Miami, FL.

    This Quinmester course includes installations, electrical and mechanical servicing, reverse cycle air conditioning, malfunctions, troubleshooting and repair, discharge, pump down, and recharging the system. The course may be taught as a two or three Quinmester credit course. In each instance the course consists of six instructional blocks:…

  11. Childhood Injuries: Keeping the #1 Killer at Bay.

    ERIC Educational Resources Information Center

    Cutright, Melitta J.

    1991-01-01

    Suggestions to help parents keep their children safe from injury include learn first aid; child-proof the home; use carseats and safety belts; lock up medications, toxic materials, sharp instruments, and guns; block off stairways; install smoke alarms; insist on bike helmets; and put safety plugs in electric sockets. (SM)

  12. Solar water heater design package

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Package describes commercial domestic-hot-water heater with roof or rack mounted solar collectors. System is adjustable to pre-existing gas or electric hot-water house units. Design package includes drawings, description of automatic control logic, evaluation measurements, possible design variations, list of materials and installation tools, and trouble-shooting guide and manual.

  13. 77 FR 1498 - Draft Environmental Assessment and Proposed Single-Species Habitat Conservation Plan for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-10

    ... wind turbines and associated facilities and access roads, maintenance of the wind turbines and... include constructing and installing the wind turbines and associated electrical facilities and access... new 230- kilovolt substation (to be built on an existing pad), maintaining the new wind turbines and...

  14. 77 FR 55829 - Western Area Power Administration; Grapevine Canyon Wind Project Record of Decision (DOE/EIS-0427)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-11

    ... megawatts of electricity from wind turbine generators (WTGs). The proposed project includes a wind energy... about the installation of red flashing lights on wind turbine generators per Federal Aviation... DEPARTMENT OF ENERGY Western Area Power Administration; Grapevine Canyon Wind Project Record of...

  15. Electricity Submetering on the Cheap: Stick-on Electricity Meters

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lanzisera, Steven; Lorek, Michael; Pister, Kristofer

    2014-08-17

    We demonstrate a low-cost, 21 x 12 mm prototype Stick-on Electricity Meter (SEM) to replace traditional in-circuit-breaker-panel current and voltage sensors for building submetering. A SEM sensor is installed on the external face of a circuit breaker to generate voltage and current signals. This allows for the computation of real and apparent power as well as capturing harmonics created by non-linear loads. The prototype sensor is built using commercially available components, resulting in a production cost of under $10 per SEM. With no highvoltage install work requiring an electrician, home owners or other individuals can install the system in amore » few minutes with no safety implications. This leads to an installed system cost that is much lower than traditional submetering technology.. Measurement results from lab characterization as well as a real-world residential dwelling installation are presented, verifying the operation of our proposed SEM sensor. The SEM sensor can resolve breaker power levels below 10W, and it can be used to provide data for non-intrusive load monitoring systems at full sample rate.« less

  16. Electromagnetic hypersensitivity: biological effects of dirty electricity with emphasis on diabetes and multiple sclerosis.

    PubMed

    Havas, Magda

    2006-01-01

    Dirty electricity is a ubiquitous pollutant. It flows along wires and radiates from them and involves both extremely low frequency electromagnetic fields and radio frequency radiation. Until recently, dirty electricity has been largely ignored by the scientific community. Recent inventions of metering and filter equipment provide scientists with the tools to measure and reduce dirty electricity on electrical wires. Several case studies and anecdotal reports are presented. Graham/Stetzer (GS) filters have been installed in schools with sick building syndrome and both staff and students reported improved health and more energy. The number of students needing inhalers for asthma was reduced in one school and student behavior associated with ADD/ADHD improved in another school. Blood sugar levels for some diabetics respond to the amount of dirty electricity in their environment. Type 1 diabetics require less insulin and Type 2 diabetics have lower blood sugar levels in an electromagnetically clean environment. Individuals diagnosed with multiple sclerosis have better balance and fewer tremors. Those requiring a cane walked unassisted within a few days to weeks after GS filters were installed in their home. Several disorders, including asthma, ADD/ADHD, diabetes, multiple sclerosis, chronic fatigue, fibromyalgia, are increasing at an alarming rate, as is electromagnetic pollution in the form of dirty electricity, ground current, and radio frequency radiation from wireless devices. The connection between electromagnetic pollution and these disorders needs to be investigated and the percentage of people sensitive to this form of energy needs to be determined.

  17. Energy balance of the global photovoltaic (PV) industry--is the PV industry a net electricity producer?

    PubMed

    Dale, Michael; Benson, Sally M

    2013-04-02

    A combination of declining costs and policy measures motivated by greenhouse gas (GHG) emissions reduction and energy security have driven rapid growth in the global installed capacity of solar photovoltaics (PV). This paper develops a number of unique data sets, namely the following: calculation of distribution of global capacity factor for PV deployment; meta-analysis of energy consumption in PV system manufacture and deployment; and documentation of reduction in energetic costs of PV system production. These data are used as input into a new net energy analysis of the global PV industry, as opposed to device level analysis. In addition, the paper introduces a new concept: a model tracking energetic costs of manufacturing and installing PV systems, including balance of system (BOS) components. The model is used to forecast electrical energy requirements to scale up the PV industry and determine the electricity balance of the global PV industry to 2020. Results suggest that the industry was a net consumer of electricity as recently as 2010. However, there is a >50% that in 2012 the PV industry is a net electricity provider and will "pay back" the electrical energy required for its early growth before 2020. Further reducing energetic costs of PV deployment will enable more rapid growth of the PV industry. There is also great potential to increase the capacity factor of PV deployment. These conclusions have a number of implications for R&D and deployment, including the following: monitoring of the energy embodied within PV systems; designing more efficient and durable systems; and deploying PV systems in locations that will achieve high capacity factors.

  18. 49 CFR 236.308 - Mechanical or electric locking or electric circuits; requisites.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Mechanical or electric locking or electric..., AND APPLIANCES Interlocking Standards § 236.308 Mechanical or electric locking or electric circuits; requisites. Mechanical or electric locking or electric circuits shall be installed to prevent signals from...

  19. Integrated Field Testing of Fuel Cells and Micro-Turbines

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jerome R. Temchin; Stephen J. Steffel

    A technical and economic evaluation of the prospects for the deployment of distributed generation on Long Beach Island, New Jersey concluded that properly sited DG would defer upgrading of the electric power grid for 10 years. This included the deployment of fuel cells or microturbines as well as reciprocating engines. The implementation phase of this project focused on the installation of a 120 kW CHP microturbine system at the Harvey Cedars Bible Conference in Harvey Cedars, NJ. A 1.1 MW generator powered by a gas-fired reciprocating engine for additional grid support was also installed at a local substation. This reportmore » contains installation and operation issues as well as the utility perspective on DG deployment.« less

  20. Geostellar: Remote Solar Energy Assessments Personalized

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    2015-10-01

    Geostellar has produced an online tool that generates a unique solar profile for homeowners to learn about the financial benefits to installing rooftop solar panels on their home. The website incorporates the physical building characteristics of the home, including shading, slope, and orientation of the roof, and applies electricity costs and incentives to determine the best solar energy estimated energy production values against actual installed rooftop photovoltaic systems. The validation conducted by NREL concluded that over three-quarters of Geostellar's potential size estimates are at least as large as the actual installed systems, indicating a correct assessment of roof availability. Inmore » addition, 87% of Geostellar's 25-year production estimates are within 90% of the actual PV Watts results.« less

  1. Photovoltaic module kit including connector assembly for non-penetrating array installation

    DOEpatents

    Botkin, Jonathan; Graves, Simon; Danning, Matt; Culligan, Matthew

    2013-12-31

    A PV module kit for non-penetrating rooftop installation, including a plurality of PV modules and a plurality of connectors. Each of the PV modules includes a PV laminate and a frame forming a mounting region assembled thereto. The connectors include a male connector having a male fastener extending from a head, and a female connector having a female fastener assempbled within a head. The heads are entirely formed of plastic. The kit provides a mounted array state including a junction at which the mounting regions of at least two of the PV modules are aligned and interconnected by engagement of the male connector with the female connector. The so-formed junction is substantially electrically insulated. The plurality of connectors can further include a spacer connector including a head forming a bore sized slidably receive the male fastener, with all of the connector heads being identical.

  2. Photovoltaic module kit including connector assembly for non-penetrating array installation

    DOEpatents

    Botkin, Jonathan [El Cerrito, CA; Graves, Simon [Berkeley, CA; Danning, Matt [Oakland, CA; Culligan, Matthew [Berkeley, CA

    2011-11-22

    A PV module kit for non-penetrating rooftop installation, including a plurality of PV modules and a plurality of connectors. Each of the PV modules includes a PV laminate and a frame forming a mounting region assembled thereto. The connectors include a male connector having a male fastener extending from a head, and a female connector having a female fastener assembled within a head. The heads are entirely formed of plastic. The kit provides a mounted array state including a junction at which the mounting region of at least two of the PV modules are aligned and interconnected by engagement of the male connector with the female connector. The so-formed junction is substantially electrically insulated. The plurality of connectors can further include a spacer connector including a head forming a bore sized to slidably receive the male fastener, with all of the connector heads being identical.

  3. Photovoltaic module kit including connector assembly for non-penetrating array installation

    DOEpatents

    Botkin, Jonathan; Graves, Simon; Danning, Matt; Culligan, Matthew

    2012-10-23

    A PV module kit for non-penetrating rooftop installation, including a plurality of PV modules and a plurality of connectors. Each of the PV modules includes a PV laminate and a frame forming a mounting region assembled thereto. The connectors include a male connector having a male fastener extending from a head, and a female connector having a female fastener assembled within a head. The heads are entirely formed of plastic. The kit provides a mounted array state including a junction at which the mounting region of at least two of the PV modules are aligned and interconnected by engagement of the male connector with the female connector. The so-formed junction is substantially electrically insulated. The plurality of connectors can further include a spacer connector including a head forming a bore sized to slidably receive the male fastener, with all of the connector heads being identical.

  4. 46 CFR 31.35-1 - Electrical installations, lighting and power equipment, batteries, etc.-TB/ALL.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Electrical installations, lighting and power equipment, batteries, etc.-TB/ALL. 31.35-1 Section 31.35-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK... and power equipment, batteries, etc.—TB/ALL. All tank vessels are subject to the regulations contained...

  5. Installation package maxi-therm S-101 heating module

    NASA Technical Reports Server (NTRS)

    1977-01-01

    The installation, operation and maintenance of the Maxi-Therm S-101 Thermosypnon Heating Module is described. The Maxi-Therm S-101 is a packaged unit, complete with air filter, blower, electrical controls, and a thermosyphon liquid to air heat exchanger. It is intended for use in residential solar heating systems and can utilize off-peak electrical power.

  6. Teachers' and Students' Perception of Instructional Supervision on Capacity Building in Electrical Installation Trade

    ERIC Educational Resources Information Center

    Eze, Ogwa Christopher

    2015-01-01

    This research was conducted to ascertain teachers' and students perception of instructional supervision in relation to capacity building in electrical installation trade in technical colleges. Three research questions and a null hypothesis were employed to guide the study. Descriptive survey was adopted. A 23-item questionnaire was used to elicit…

  7. 46 CFR 31.35-1 - Electrical installations, lighting and power equipment, batteries, etc.-TB/ALL.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 1 2011-10-01 2011-10-01 false Electrical installations, lighting and power equipment, batteries, etc.-TB/ALL. 31.35-1 Section 31.35-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK... and power equipment, batteries, etc.—TB/ALL. All tank vessels are subject to the regulations contained...

  8. 46 CFR 31.35-1 - Electrical installations, lighting and power equipment, batteries, etc.-TB/ALL.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 1 2012-10-01 2012-10-01 false Electrical installations, lighting and power equipment, batteries, etc.-TB/ALL. 31.35-1 Section 31.35-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK... and power equipment, batteries, etc.—TB/ALL. All tank vessels are subject to the regulations contained...

  9. 46 CFR 31.35-1 - Electrical installations, lighting and power equipment, batteries, etc.-TB/ALL.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 1 2014-10-01 2014-10-01 false Electrical installations, lighting and power equipment, batteries, etc.-TB/ALL. 31.35-1 Section 31.35-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK... and power equipment, batteries, etc.—TB/ALL. All tank vessels are subject to the regulations contained...

  10. 46 CFR 31.35-1 - Electrical installations, lighting and power equipment, batteries, etc.-TB/ALL.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 1 2013-10-01 2013-10-01 false Electrical installations, lighting and power equipment, batteries, etc.-TB/ALL. 31.35-1 Section 31.35-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK... and power equipment, batteries, etc.—TB/ALL. All tank vessels are subject to the regulations contained...

  11. 29 CFR 1910.331 - Scope.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... wiring. Installations of other outside conductors on the premises. (4) Optical fiber cable. Installations of optical fiber cable where such installations are made along with electric conductors. Note: See... of utilization equipment used for purposes other than generating, transmitting, or distributing...

  12. 29 CFR 1910.331 - Scope.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... wiring. Installations of other outside conductors on the premises. (4) Optical fiber cable. Installations of optical fiber cable where such installations are made along with electric conductors. Note: See... of utilization equipment used for purposes other than generating, transmitting, or distributing...

  13. Chemical/Biological Agent Resistance Test (CBART) Test Fixture System Verification and Analytical Monitioring System Development

    DTIC Science & Technology

    2011-03-15

    Lone Eagle Street Columbus Ohio 43228 Installation trades personnel 5/7/2009 12:00:00AM 10/31/2010 12:00:00AM Sub Contractor Numbers (c): Patent...43026-2573 Pipe fitter installation trades personnel. 10/21/2009 12:00:00AM 1/31/2011 12:00:00AM Sub Contractor Numbers (c): Patent Clause Number...City Electric Company 1099 Sullivant Avenue Columbus Ohio 43223 Electrical installation trades personnel 4/5/2009 12:00:00AM 9/30/2010 12:00:00AM

  14. 29 CFR 1910.332 - Training.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Electrical Accident Occupation Blue collar supervisors. 1 Electrical and electronic engineers. 1 Electrical... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Electrical Safety-Related Work Practices § 1910.332 Training. (a... electric shock that is not reduced to a safe level by the electrical installation requirements of §§ 1910...

  15. 29 CFR 1910.332 - Training.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Electrical Accident Occupation Blue collar supervisors. 1 Electrical and electronic engineers. 1 Electrical... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Electrical Safety-Related Work Practices § 1910.332 Training. (a... electric shock that is not reduced to a safe level by the electrical installation requirements of §§ 1910...

  16. 29 CFR 1910.332 - Training.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Electrical Accident Occupation Blue collar supervisors. 1 Electrical and electronic engineers. 1 Electrical... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Electrical Safety-Related Work Practices § 1910.332 Training. (a... electric shock that is not reduced to a safe level by the electrical installation requirements of §§ 1910...

  17. 29 CFR 1910.332 - Training.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Electrical Accident Occupation Blue collar supervisors. 1 Electrical and electronic engineers. 1 Electrical... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Electrical Safety-Related Work Practices § 1910.332 Training. (a... electric shock that is not reduced to a safe level by the electrical installation requirements of §§ 1910...

  18. 29 CFR 1910.332 - Training.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Electrical Accident Occupation Blue collar supervisors. 1 Electrical and electronic engineers. 1 Electrical... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Electrical Safety-Related Work Practices § 1910.332 Training. (a... electric shock that is not reduced to a safe level by the electrical installation requirements of §§ 1910...

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fu, Ran; Feldman, David; Margolis, Robert

    NREL has been modeling U.S. photovoltaic (PV) system costs since 2009. This year, our report benchmarks costs of U.S. solar PV for residential, commercial, and utility-scale systems built in the first quarter of 2017 (Q1 2017). Costs are represented from the perspective of the developer/installer, thus all hardware costs represent the price at which components are purchased by the developer/installer, not accounting for preexisting supply agreements or other contracts. Importantly, the benchmark this year (2017) also represents the sales price paid to the installer; therefore, it includes profit in the cost of the hardware, along with the profit the installer/developermore » receives, as a separate cost category. However, it does not include any additional net profit, such as a developer fee or price gross-up, which are common in the marketplace. We adopt this approach owing to the wide variation in developer profits in all three sectors, where project pricing is highly dependent on region and project specifics such as local retail electricity rate structures, local rebate and incentive structures, competitive environment, and overall project or deal structures.« less

  20. U.S. Solar Photovoltaic System Cost Benchmark: Q1 2017

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fu, Ran; Feldman, David J.; Margolis, Robert M.

    NREL has been modeling U.S. photovoltaic (PV) system costs since 2009. This year, our report benchmarks costs of U.S. solar PV for residential, commercial, and utility-scale systems built in the first quarter of 2017 (Q1 2017). Costs are represented from the perspective of the developer/installer, thus all hardware costs represent the price at which components are purchased by the developer/installer, not accounting for preexisting supply agreements or other contracts. Importantly, the benchmark this year (2017) also represents the sales price paid to the installer; therefore, it includes profit in the cost of the hardware, along with the profit the installer/developermore » receives, as a separate cost category. However, it does not include any additional net profit, such as a developer fee or price gross-up, which are common in the marketplace. We adopt this approach owing to the wide variation in developer profits in all three sectors, where project pricing is highly dependent on region and project specifics such as local retail electricity rate structures, local rebate and incentive structures, competitive environment, and overall project or deal structures.« less

  1. REACH. Electricity Units, Post-Secondary.

    ERIC Educational Resources Information Center

    Smith, Gene; And Others

    As a part of the REACH (Refrigeration, Electro-Mechanical, Air-Conditioning, Heating) electromechanical cluster, this postsecondary student manual contains individualized instructional units in the area of electricity. The instructional units focus on electricity fundamentals, electric motors, electrical components, and controls and installation.…

  2. 46 CFR 111.95-1 - Applicability.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-1 Applicability. (a) The electric installation of each electric power-operated boat winch must meet the requirements in this subpart, except that limit...

  3. 46 CFR 111.95-1 - Applicability.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-1 Applicability. (a) The electric installation of each electric power-operated boat winch must meet the requirements in this subpart, except that limit...

  4. 46 CFR 111.95-1 - Applicability.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-1 Applicability. (a) The electric installation of each electric power-operated boat winch must meet the requirements in this subpart, except that limit...

  5. 46 CFR 111.95-1 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-1 Applicability. (a) The electric installation of each electric power-operated boat winch must meet the requirements in this subpart, except that limit...

  6. 46 CFR 111.95-1 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-1 Applicability. (a) The electric installation of each electric power-operated boat winch must meet the requirements in this subpart, except that limit...

  7. Analysis of initial performance of Solergy's HCPV/T system at Rome-Fiumicino International Airport

    NASA Astrophysics Data System (ADS)

    Micheli, Leonardo; Femia, Giuseppe; Liani, Martina; Poli, Ruggero; Banin, Yoav; Lanzara, Giovanni; Kurtz, Sarah

    2017-09-01

    A commercial HCPV/T system, developed by Solergy, is installed at the airport of Rome, in Italy, as part of a prototype smart grid. The system is rated at 15 kW AC electric and 20 kW thermal and is used to provide both electricity for charging electric vehicles and heat for a conventional thermal power plant. This paper presents an analysis of the performance of the system, operating since March 2017, which achieves a combined peak efficiency of 48%. This study incorporates also an investigation on the improvements that can benefit the system, including a new type of receiver with improved heat dissipation.

  8. Wireless power transfer electric vehicle supply equipment installation and validation tool

    DOEpatents

    Jones, Perry T.; Miller, John M.

    2015-05-19

    A transmit pad inspection device includes a magnetic coupling device, which includes an inductive circuit that is configured to magnetically couple to a primary circuit of a charging device in a transmit pad through an alternating current (AC) magnetic field. The inductive circuit functions as a secondary circuit for a set of magnetically coupled coils. The magnetic coupling device further includes a rectification circuit, and includes a controllable load bank or is configured to be connected to an external controllable load back. The transmit pad inspection device is configured to determine the efficiency of power transfer under various coupling conditions. In addition, the transmit pad inspection device can be configured to measure residual magnetic field and the frequency of the input current, and to determine whether the charging device has been installed properly.

  9. Procedures and criteria for increasing the earthquake resistance level of electrical substations and special installations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Couch, R.W.; Deacon, R.J.

    1973-09-30

    This report defines a procedure and provides basic information needed to determine the modifications required to make electrical substations and special installations of the Bonneville Power Administration (BPA) more resistant to strong earthquake ground motion. It also provides a procedure for developing an effective plan for establishing the sequence, or priority, of providing the required modifications.

  10. Circuits Protect Against Incorrect Power Connections

    NASA Technical Reports Server (NTRS)

    Delombard, Richard

    1992-01-01

    Simple circuits prevent application of incorrectly polarized or excessive voltages. Connected temporarily or permanently at power-connecting terminals. Devised to protect electrical and electronic equipment installed in spacecraft and subjected to variety of tests in different facilities prior to installation. Basic concept of protective circuits also applied easily to many kinds of electrical and electronic equipment that must be protected against incorrect power connections.

  11. 24 CFR 3285.701 - Electrical crossovers.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 5 2011-04-01 2011-04-01 false Electrical crossovers. 3285.701... URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Electrical Systems and Equipment § 3285.701 Electrical crossovers. Multi-section homes with electrical wiring in more than one section require...

  12. 24 CFR 3285.701 - Electrical crossovers.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 5 2013-04-01 2013-04-01 false Electrical crossovers. 3285.701... URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Electrical Systems and Equipment § 3285.701 Electrical crossovers. Multi-section homes with electrical wiring in more than one section require...

  13. 24 CFR 3285.701 - Electrical crossovers.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 5 2014-04-01 2014-04-01 false Electrical crossovers. 3285.701... URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Electrical Systems and Equipment § 3285.701 Electrical crossovers. Multi-section homes with electrical wiring in more than one section require...

  14. 24 CFR 3285.701 - Electrical crossovers.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 5 2012-04-01 2012-04-01 false Electrical crossovers. 3285.701... URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Electrical Systems and Equipment § 3285.701 Electrical crossovers. Multi-section homes with electrical wiring in more than one section require...

  15. Construction Electrician 3 & 2. Rate Training Manual and Nonresident Career Course.

    ERIC Educational Resources Information Center

    Naval Education and Training Command, Pensacola, FL.

    One of a series of training manuals prepared for enlisted personnel in the Navy and Naval Reserve, this self-study package provides subject matter that relates directly to the tasks required of the Construction Electrician, which include abilities to install, operate, service, and overhaul electric generating and distribution systems and wire…

  16. 25 CFR 162.538 - What is the purpose of a WSR lease?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... maintenance of wind and/or solar energy resource development projects. Activities include installing... Wind and Solar Resource Leases Wsr Leases § 162.538 What is the purpose of a WSR lease? A WSR lease... electricity and other related activities. Leases for biomass or waste-to-energy purposes are governed by...

  17. 25 CFR 162.538 - What is the purpose of a WSR lease?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... maintenance of wind and/or solar energy resource development projects. Activities include installing... Wind and Solar Resource Leases Wsr Leases § 162.538 What is the purpose of a WSR lease? A WSR lease... electricity and other related activities. Leases for biomass or waste-to-energy purposes are governed by...

  18. China starts tapping rich geothermal resources

    NASA Astrophysics Data System (ADS)

    Guang, D.

    1980-09-01

    Attention is given to the electric and power installation running on geothermal energy at Yangbajain, Tibet. Other geothermal projects in Tibet, the Yunnan Province and the North China Plain are also outlined. Applications of geothermal energy are described, including the heating of homes and factories, spinning, weaving, paper-making and the making of wine.

  19. 24 CFR 3280.708 - Exhaust duct system and provisions for the future installation of a clothes dryer.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...(a)(1) through (5). (c) Provisions for future installation of electric clothes dryers. When wiring is... for the future installation of a clothes dryer. 3280.708 Section 3280.708 Housing and Urban... duct system and provisions for the future installation of a clothes dryer. (a) Clothes dryers. (1) All...

  20. Improving Energy Security for Air Force Installations

    NASA Astrophysics Data System (ADS)

    Schill, David

    Like civilian infrastructure, Air Force installations are dependent on electrical energy for daily operations. Energy shortages translate to decreased productivity, higher costs, and increased health risks. But for the United States military, energy shortages have the potential to become national security risks. Over ninety-five percent of the electrical energy used by the Air Force is supplied by the domestic grid, which is susceptible to shortages and disruptions. Many Air Force operations require a continuous source of energy, and while the Air Force has historically established redundant supplies of electrical energy, these back-ups are designed for short-term outages and may not provide sufficient supply for a longer, sustained power outage. Furthermore, it is the goal of the Department of Defense to produce or procure 25 percent of its facility energy from renewable sources by fiscal year 2025. In a government budget environment where decision makers are required to provide more capability with less money, it is becoming increasingly important for informed decisions regarding which energy supply options bear the most benefit for an installation. The analysis begins by exploring the field of energy supply options available to an Air Force installation. The supply options are assessed according to their ability to provide continuous and reliable energy, their applicability to unique requirements of Air Force installations, and their costs. Various methods of calculating energy usage by an installation are also addressed. The next step of this research develops a methodology and tool which assesses how an installation responds to various power outage scenarios. Lastly, various energy supply options are applied to the tool, and the results are reported in terms of cost and loss of installation capability. This approach will allow installation commanders and energy managers the ability to evaluate the cost and effectiveness of various energy investment options.

  1. Electric Vehicle Charging Stations as a Climate Change Mitigation Strategy

    NASA Technical Reports Server (NTRS)

    Cave, Bridget; DeYoung, Russell J.

    2014-01-01

    In order to facilitate the use of electric vehicles at NASA Langley Research Center (LaRC), charging stations should be made available to LaRC employees. The implementation of charging stations would decrease the need for gasoline thus decreasing CO2 emissions improving local air quality and providing a cost savings for LaRC employees. A charging station pilot program is described that would install stations as the need increased and also presents a business model that pays for the electricity used and installation at no cost to the government.

  2. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stein, Joshua; Burnham, Laurie; Jones, Christian Birk

    The U.S. DOE Regional Test Center for Solar Technologies program was established to validate photovoltaic (PV) technologies installed in a range of different climates. The program is funded by the Energy Department's SunShot Initiative. The initiative seeks to make solar energy cost competitive with other forms of electricity by the end of the decade. Sandia National Laboratory currently manages four different sites across the country. The National Renewable Energy Laboratory manages a fifth site in Colorado. The entire PV portfolio currently includes 20 industry partners and almost 500 kW of installed systems. The program follows a defined process that outlinesmore » tasks, milestones, agreements, and deliverables. The process is broken out into four main parts: 1) planning and design, 2) installation, 3) operations, and 4) decommissioning. This operations manual defines the various elements of each part.« less

  3. Mortality of persons resident in the vicinity of electricity transmission facilities.

    PubMed Central

    McDowall, M. E.

    1986-01-01

    Several studies have raised the possibility that exposure to electrical and/or magnetic fields may be injurious to health in particular by the promotion or initiation of cancer. To investigate whether the electricity transmission system presents a long term hazard to public health, the mortality of nearly 8,000 persons, identified as living in the vicinity of electrical transmission facilities at the time of the 1971 Population Census, has been followed to the end of 1983. All identified transmission installations within pre-defined areas were included in the study with the result that the greater part of the study group were believed to be resident near relatively low voltage sub-stations. Overall mortality was lower than expected and no evidence of major health hazards emerged. The only statistically significant excess mortality was for lung cancer (in women overall, and in persons living closest to the installations); this result is difficult to interpret in the absence of smoking data, and is not supported by other evidence but does not appear to be due to the social class distribution of the study group. The study did not support previously reported associations of exposure to electro-magnetic fields with acute myeloid leukaemia, other lymphatic cancers and suicide. PMID:3456788

  4. Occupational exposure to electromagnetic fields and sex-differential risk of uveal melanoma.

    PubMed

    Behrens, Thomas; Lynge, Elsebeth; Cree, Ian; Sabroe, Svend; Lutz, Jean-Michel; Afonso, Noemia; Eriksson, Mikael; Guénel, Pascal; Merletti, Franco; Morales-Suarez-Varela, Maria; Stengrevics, Aivars; Févotte, Joëlle; Llopis-González, Agustin; Gorini, Giuseppe; Sharkova, Galina; Hardell, Lennart; Ahrens, Wolfgang

    2010-11-01

    The association between occupational exposure to electromagnetic fields (EMF) and the risk of uveal melanoma was investigated in a case-control study in nine European countries. Incident cases of uveal melanoma and population as well as hospital controls were included and frequency matched by country, 5-year birth cohort and sex. Subjects were asked whether they had worked close to high-voltage electrical transmission installations, computer screens and various electrical machines, or in complex electrical environments. Measurements of two Scandinavian job-exposure matrices were applied to estimate lifelong cumulative EMF exposure. Unconditional logistic regression analyses, stratified by sex and eye colour were calculated, adjusting for several potential confounders. 293 patients with uveal melanoma and 3198 control subjects were interviewed. Women exposed to electrical transmission installations showed elevated risks (OR 5.81, 95% CI 1.72 to 19.66). Positive associations with exposure to control rooms were seen among men and women, but most risk increases were restricted to subjects with dark iris colour. Application of published EMF measurements revealed stronger risk increases among women compared to men. Again, elevated risks were restricted to subjects with dark eye colour. Although based on a low prevalence of exposure to potential occupational sources of EMF, our data indicate that exposed dark-eyed women may be at particular risk for uveal melanoma.

  5. Instructional Strategies and Students' Academic Performance in Electrical Installation in Technical Colleges in Akwa Ibom State: Instructional Skills for Structuring Appropriate Learning Experiences for Students

    ERIC Educational Resources Information Center

    Onweh, Vincent E.; Akpan, Udeme Timothy

    2014-01-01

    The study investigated the effects of instructional strategies on students' academic performance in Electrical Installation in Technical Colleges in Akwa Ibom State. Instructional skills are the most specific category of teaching behaviours. A non-equivalent control group quasi experimental design was adopted for the study. Four intact classes…

  6. Nuclear power generation and fuel cycle report 1997

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-09-01

    Nuclear power is an important source of electric energy and the amount of nuclear-generated electricity continued to grow as the performance of nuclear power plants improved. In 1996, nuclear power plants supplied 23 percent of the electricity production for countries with nuclear units, and 17 percent of the total electricity generated worldwide. However, the likelihood of nuclear power assuming a much larger role or even retaining its current share of electricity generation production is uncertain. The industry faces a complex set of issues including economic competitiveness, social acceptance, and the handling of nuclear waste, all of which contribute to themore » uncertain future of nuclear power. Nevertheless, for some countries the installed nuclear generating capacity is projected to continue to grow. Insufficient indigenous energy resources and concerns over energy independence make nuclear electric generation a viable option, especially for the countries of the Far East.« less

  7. Electricity End Uses, Energy Efficiency, and Distributed Energy Resources Baseline

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schwartz, Lisa; Wei, Max; Morrow, William

    This report was developed by a team of analysts at Lawrence Berkeley National Laboratory, with Argonne National Laboratory contributing the transportation section, and is a DOE EPSA product and part of a series of “baseline” reports intended to inform the second installment of the Quadrennial Energy Review (QER 1.2). QER 1.2 provides a comprehensive review of the nation’s electricity system and cover the current state and key trends related to the electricity system, including generation, transmission, distribution, grid operations and planning, and end use. The baseline reports provide an overview of elements of the electricity system. This report focuses onmore » end uses, electricity consumption, electric energy efficiency, distributed energy resources (DERs) (such as demand response, distributed generation, and distributed storage), and evaluation, measurement, and verification (EM&V) methods for energy efficiency and DERs.« less

  8. 33 CFR 159.71 - Electrical controls and conductors.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false Electrical controls and... Electrical controls and conductors. Electrical controls and conductors must be installed in accordance with good marine practice. Wire must be copper and must be stranded. Electrical controls and conductors must...

  9. 33 CFR 159.71 - Electrical controls and conductors.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Electrical controls and... Electrical controls and conductors. Electrical controls and conductors must be installed in accordance with good marine practice. Wire must be copper and must be stranded. Electrical controls and conductors must...

  10. 33 CFR 159.71 - Electrical controls and conductors.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false Electrical controls and... Electrical controls and conductors. Electrical controls and conductors must be installed in accordance with good marine practice. Wire must be copper and must be stranded. Electrical controls and conductors must...

  11. 46 CFR 111.01-1 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-1 General. (a) Electric installations on vessels must ensure: (1) Maintenance of services... persons, and the vessel from electrical hazards. (3) Maintenance of system integrity through compliance...

  12. 46 CFR 110.30-5 - Inspection for certification.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Testing and Inspection § 110.30-5 Inspection for certification. Electric installations and electric... mechanical and electrical condition and performance. Particular note must be made of circuits added or...

  13. 46 CFR 110.30-5 - Inspection for certification.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Testing and Inspection § 110.30-5 Inspection for certification. Electric installations and electric... mechanical and electrical condition and performance. Particular note must be made of circuits added or...

  14. 46 CFR 111.01-1 - General.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-1 General. (a) Electric installations on vessels must ensure: (1) Maintenance of services... persons, and the vessel from electrical hazards. (3) Maintenance of system integrity through compliance...

  15. 46 CFR 111.01-1 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-1 General. (a) Electric installations on vessels must ensure: (1) Maintenance of services... persons, and the vessel from electrical hazards. (3) Maintenance of system integrity through compliance...

  16. 46 CFR 110.30-5 - Inspection for certification.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Testing and Inspection § 110.30-5 Inspection for certification. Electric installations and electric... mechanical and electrical condition and performance. Particular note must be made of circuits added or...

  17. 29 CFR 1926.404 - Wiring design and protection.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... tracks of electrically operated cranes; frames of nonelectrically driven elevator cars to which electric..., DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Electrical Installation Safety... conductors, transformers, or other electric equipment, unless such equipment is controlled by a disconnecting...

  18. 29 CFR 1926.404 - Wiring design and protection.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... tracks of electrically operated cranes; frames of nonelectrically driven elevator cars to which electric..., DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Electrical Installation Safety... conductors, transformers, or other electric equipment, unless such equipment is controlled by a disconnecting...

  19. The MOD-OA 200 kilowatt wind turbine generator design and analysis report

    NASA Astrophysics Data System (ADS)

    Andersen, T. S.; Bodenschatz, C. A.; Eggers, A. G.; Hughes, P. S.; Lampe, R. F.; Lipner, M. H.; Schornhorst, J. R.

    1980-08-01

    The project requirements, approach, system description, design requirements, design, analysis, system tests, installation safety considerations, failure modes and effects analysis, data acquisition, and initial performance for the MOD-OA 200 kw wind turbine generator are discussed. The components, the rotor, driven train, nacelle equipment, yaw drive mechanism and brake, tower, foundation, electrical system, and control systems are presented. The rotor includes the blades, hub and pitch change mechanism. The drive train includes the low speed shaft, speed increaser, high speed shaft, and rotor brake. The electrical system includes the generator, switchgear, transformer, and utility connection. The control systems are the blade pitch, yaw, and generator control, and the safety system. Manual, automatic, and remote control and Dynamic loads and fatigue are analyzed.

  20. The MOD-OA 200 kilowatt wind turbine generator design and analysis report

    NASA Technical Reports Server (NTRS)

    Andersen, T. S.; Bodenschatz, C. A.; Eggers, A. G.; Hughes, P. S.; Lampe, R. F.; Lipner, M. H.; Schornhorst, J. R.

    1980-01-01

    The project requirements, approach, system description, design requirements, design, analysis, system tests, installation safety considerations, failure modes and effects analysis, data acquisition, and initial performance for the MOD-OA 200 kw wind turbine generator are discussed. The components, the rotor, driven train, nacelle equipment, yaw drive mechanism and brake, tower, foundation, electrical system, and control systems are presented. The rotor includes the blades, hub and pitch change mechanism. The drive train includes the low speed shaft, speed increaser, high speed shaft, and rotor brake. The electrical system includes the generator, switchgear, transformer, and utility connection. The control systems are the blade pitch, yaw, and generator control, and the safety system. Manual, automatic, and remote control and Dynamic loads and fatigue are analyzed.

  1. 49 CFR 393.30 - Battery installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 5 2010-10-01 2010-10-01 false Battery installation. 393.30 Section 393.30... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.30 Battery installation. Every storage battery on every vehicle, unless located in the engine compartment, shall be covered by a...

  2. 46 CFR 169.609 - Exhaust systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Exhaust systems. 169.609 Section 169.609 Shipping COAST... Electrical Internal Combustion Engine Installations § 169.609 Exhaust systems. Engine exhaust installations... Yacht Council, Inc. Standard P-1, “Safe Installation of Exhaust Systems for Propulsion and Auxiliary...

  3. 49 CFR 393.30 - Battery installation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 5 2013-10-01 2013-10-01 false Battery installation. 393.30 Section 393.30... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.30 Battery installation. Every storage battery on every vehicle, unless located in the engine compartment, shall be covered by a...

  4. 49 CFR 393.30 - Battery installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 5 2011-10-01 2011-10-01 false Battery installation. 393.30 Section 393.30... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.30 Battery installation. Every storage battery on every vehicle, unless located in the engine compartment, shall be covered by a...

  5. 49 CFR 393.30 - Battery installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 5 2014-10-01 2014-10-01 false Battery installation. 393.30 Section 393.30... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.30 Battery installation. Every storage battery on every vehicle, unless located in the engine compartment, shall be covered by a...

  6. 49 CFR 393.30 - Battery installation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 5 2012-10-01 2012-10-01 false Battery installation. 393.30 Section 393.30... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.30 Battery installation. Every storage battery on every vehicle, unless located in the engine compartment, shall be covered by a...

  7. 46 CFR 169.685 - Electric heating and cooking equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SCHOOL VESSELS Machinery and Electrical Electrical Installations Operating at Potentials of 50 Volts Or... spillage on wiring or the deck. (f) Where necessary for safety of personnel, grab rails must be provided...

  8. Study on Electricity Business Expansion and Electricity Sales Based on Seasonal Adjustment

    NASA Astrophysics Data System (ADS)

    Zhang, Yumin; Han, Xueshan; Wang, Yong; Zhang, Li; Yang, Guangsen; Sun, Donglei; Wang, Bolun

    2017-05-01

    [1] proposed a novel analysis and forecast method of electricity business expansion based on Seasonal Adjustment, we extend this work to include the effect the micro and macro aspects, respectively. From micro aspect, we introduce the concept of load factor to forecast the stable value of electricity consumption of single new consumer after the installation of new capacity of the high-voltage transformer. From macro aspects, considering the growth of business expanding is also stimulated by the growth of electricity sales, it is necessary to analyse the antecedent relationship between business expanding and electricity sales. First, forecast electricity consumption of customer group and release rules of expanding capacity, respectively. Second, contrast the degree of fitting and prediction accuracy to find out the antecedence relationship and analyse the reason. Also, it can be used as a contrast to observe the influence of customer group in different ranges on the prediction precision. Finally, Simulation results indicate that the proposed method is accurate to help determine the value of expanding capacity and electricity consumption.

  9. National Electrical Code in Power Engineering Course for Electrical Engineering Curriculum

    ERIC Educational Resources Information Center

    Azizur, Rahman M. M.

    2011-01-01

    In order to ensure the safety of their inhabitants and properties, the residential, industrial and business installations require complying with NEC (national electrical code) for electrical systems. Electrical design engineers and technicians rely heavily on these very important design guidelines. However, these design guidelines are not formally…

  10. 46 CFR 169.676 - Grounded electrical systems.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false Grounded electrical systems. 169.676 Section 169.676... Machinery and Electrical Electrical Installations Operating at Potentials of 50 Volts Or More on Vessels of Less Than 100 Gross Tons § 169.676 Grounded electrical systems. (a) Except as provided in paragraph (b...

  11. 46 CFR 169.676 - Grounded electrical systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Grounded electrical systems. 169.676 Section 169.676... Machinery and Electrical Electrical Installations Operating at Potentials of 50 Volts Or More on Vessels of Less Than 100 Gross Tons § 169.676 Grounded electrical systems. (a) Except as provided in paragraph (b...

  12. 46 CFR 169.676 - Grounded electrical systems.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false Grounded electrical systems. 169.676 Section 169.676... Machinery and Electrical Electrical Installations Operating at Potentials of 50 Volts Or More on Vessels of Less Than 100 Gross Tons § 169.676 Grounded electrical systems. (a) Except as provided in paragraph (b...

  13. 46 CFR 169.676 - Grounded electrical systems.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false Grounded electrical systems. 169.676 Section 169.676... Machinery and Electrical Electrical Installations Operating at Potentials of 50 Volts Or More on Vessels of Less Than 100 Gross Tons § 169.676 Grounded electrical systems. (a) Except as provided in paragraph (b...

  14. 46 CFR 169.676 - Grounded electrical systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Grounded electrical systems. 169.676 Section 169.676... Machinery and Electrical Electrical Installations Operating at Potentials of 50 Volts Or More on Vessels of Less Than 100 Gross Tons § 169.676 Grounded electrical systems. (a) Except as provided in paragraph (b...

  15. 47 CFR 80.864 - Emergency electric lights.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Emergency electric lights. 80.864 Section 80... W § 80.864 Emergency electric lights. (a) Emergency electric light(s) must be installed to...) The emergency electric light(s) must be energized from the reserve power supply, if a reserve power...

  16. 47 CFR 80.864 - Emergency electric lights.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 5 2014-10-01 2014-10-01 false Emergency electric lights. 80.864 Section 80... W § 80.864 Emergency electric lights. (a) Emergency electric light(s) must be installed to...) The emergency electric light(s) must be energized from the reserve power supply, if a reserve power...

  17. 47 CFR 80.864 - Emergency electric lights.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Emergency electric lights. 80.864 Section 80... W § 80.864 Emergency electric lights. (a) Emergency electric light(s) must be installed to...) The emergency electric light(s) must be energized from the reserve power supply, if a reserve power...

  18. 47 CFR 80.864 - Emergency electric lights.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Emergency electric lights. 80.864 Section 80... W § 80.864 Emergency electric lights. (a) Emergency electric light(s) must be installed to...) The emergency electric light(s) must be energized from the reserve power supply, if a reserve power...

  19. 47 CFR 80.864 - Emergency electric lights.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 5 2013-10-01 2013-10-01 false Emergency electric lights. 80.864 Section 80... W § 80.864 Emergency electric lights. (a) Emergency electric light(s) must be installed to...) The emergency electric light(s) must be energized from the reserve power supply, if a reserve power...

  20. Application of electric corona discharge for grain seeds treatment before sowing

    NASA Astrophysics Data System (ADS)

    Porsev, E. G.; Malozyomov, B. V.; Rozhkova, M. V.

    2017-10-01

    The paper overviews directions for electrotechnology treatment of grain seeds before sowing. The hypothesis of the germination enhancement of seeds if treated with corona discharge is presented here. Besides, the description of electrotechnology installation and facilities for it including manufacturing process quality obtained as a result of scientific tests are also provided in the paper.

  1. Fuel Price Effects on Readiness

    DTIC Science & Technology

    2014-05-01

    Wide Fuel Management 1. DLA’s Role DLA-E has the mission of acquiring, storing, selling, and distributing energy including petroleum, natural gas ...energy, and installations also use energy in the form of electricity (11 percent), natural gas (8 percent), and coal (2 percent). See Schwartz, Blakely...have also excluded liquefied propane gas (LPG), from this study. 10 through four IDIQ

  2. Energy Efficient Demonstration Proves Powerful in Home Retrofits -

    Science.gov Websites

    project team that included key Navy stakeholders at the regional and Naval Base Guam installation levels was Naval Base Guam in Apra Harbor, which has 1,369 houses for its active-duty Navy and family members millions." Given Naval Base Guam's high electricity rates of $0.50 per kilowatt hour, the efficiency

  3. Analysis of Initial Performance of Solergy's HCPV/T System at Rome-Fiumicino International Airport

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kurtz, Sarah; Micheli, Leonardo; v, Giuseppe

    A commercial HCPV/T system, developed by Solergy, is installed at the airport of Rome, in Italy, as part of a prototype smart grid. The system is rated at 15 kW AC electric and 20 kW thermal and is used to provide both electricity for charging electric vehicles and heat for a conventional thermal power plant. This paper presents an analysis of the performance of the system, operating since March 2017, which achieves a combined peak efficiency of 48%. This study incorporates also an investigation on the improvements that can benefit the system, including a new type of receiver with improvedmore » heat dissipation.« less

  4. 30 CFR 77.211-1 - Continuous methane monitoring device; installation and operation; automatic deenergization of...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Continuous methane monitoring device... Installations § 77.211-1 Continuous methane monitoring device; installation and operation; automatic deenergization of electric equipment. Continuous methane monitoring devices shall be set to deenergize...

  5. 30 CFR 77.509 - Transformers; installation and guarding.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Transformers; installation and guarding. 77.509... COAL MINES Electrical Equipment-General § 77.509 Transformers; installation and guarding. (a) Transformers shall be of the totally enclosed type, or shall be placed at least 8 feet above the ground, or...

  6. 30 CFR 77.509 - Transformers; installation and guarding.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Transformers; installation and guarding. 77.509... COAL MINES Electrical Equipment-General § 77.509 Transformers; installation and guarding. (a) Transformers shall be of the totally enclosed type, or shall be placed at least 8 feet above the ground, or...

  7. 30 CFR 77.509 - Transformers; installation and guarding.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Transformers; installation and guarding. 77.509... COAL MINES Electrical Equipment-General § 77.509 Transformers; installation and guarding. (a) Transformers shall be of the totally enclosed type, or shall be placed at least 8 feet above the ground, or...

  8. 30 CFR 77.509 - Transformers; installation and guarding.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Transformers; installation and guarding. 77.509... COAL MINES Electrical Equipment-General § 77.509 Transformers; installation and guarding. (a) Transformers shall be of the totally enclosed type, or shall be placed at least 8 feet above the ground, or...

  9. 30 CFR 77.509 - Transformers; installation and guarding.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Transformers; installation and guarding. 77.509... COAL MINES Electrical Equipment-General § 77.509 Transformers; installation and guarding. (a) Transformers shall be of the totally enclosed type, or shall be placed at least 8 feet above the ground, or...

  10. 46 CFR 120.200 - General design, installation, and maintenance requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false General design, installation, and maintenance requirements. 120.200 Section 120.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS CARRYING MORE THAN 150 PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS ELECTRICAL INSTALLATION General...

  11. 46 CFR 120.200 - General design, installation, and maintenance requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false General design, installation, and maintenance requirements. 120.200 Section 120.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS CARRYING MORE THAN 150 PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS ELECTRICAL INSTALLATION General...

  12. 46 CFR 169.607 - Keel cooler installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Machinery and Electrical Internal Combustion Engine Installations § 169.607 Keel cooler installations. (a... vessel. (d) Short lengths of approved nonmetallic flexible hose may be used at machinery connections... do not depend on spring tension for their holding power; and (3) Two clamps are used on each end of...

  13. 46 CFR 169.607 - Keel cooler installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Machinery and Electrical Internal Combustion Engine Installations § 169.607 Keel cooler installations. (a... vessel. (d) Short lengths of approved nonmetallic flexible hose may be used at machinery connections... do not depend on spring tension for their holding power; and (3) Two clamps are used on each end of...

  14. 46 CFR 169.607 - Keel cooler installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Machinery and Electrical Internal Combustion Engine Installations § 169.607 Keel cooler installations. (a... vessel. (d) Short lengths of approved nonmetallic flexible hose may be used at machinery connections... do not depend on spring tension for their holding power; and (3) Two clamps are used on each end of...

  15. 46 CFR 169.607 - Keel cooler installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Machinery and Electrical Internal Combustion Engine Installations § 169.607 Keel cooler installations. (a... vessel. (d) Short lengths of approved nonmetallic flexible hose may be used at machinery connections... do not depend on spring tension for their holding power; and (3) Two clamps are used on each end of...

  16. 46 CFR 169.607 - Keel cooler installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Machinery and Electrical Internal Combustion Engine Installations § 169.607 Keel cooler installations. (a... vessel. (d) Short lengths of approved nonmetallic flexible hose may be used at machinery connections... do not depend on spring tension for their holding power; and (3) Two clamps are used on each end of...

  17. 30 CFR 77.211-1 - Continuous methane monitoring device; installation and operation; automatic deenergization of...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Continuous methane monitoring device... Installations § 77.211-1 Continuous methane monitoring device; installation and operation; automatic deenergization of electric equipment. Continuous methane monitoring devices shall be set to deenergize...

  18. Using solar-powered refrigeration for vaccine storage where other sources of reliable electricity are inadequate or costly.

    PubMed

    McCarney, Steve; Robertson, Joanie; Arnaud, Juliette; Lorenson, Kristina; Lloyd, John

    2013-12-09

    Large areas of many developing countries have no grid electricity. This is a serious challenge that threatens the continuity of the vaccine cold chain. The main alternatives to electrically powered refrigerators available for many years--kerosene- and gas-driven refrigerators--are plagued by problems with gas supply interruptions, low efficiency, poor temperature control, and frequent maintenance needs. There are currently no kerosene- or gas-driven refrigerators that qualify under the minimum standards established by the World Health Organization (WHO) Performance, Quality, and Safety (PQS) system. Solar refrigeration was a promising development in the early 1980s, providing an alternative to absorption technology to meet cold chain needs in remote areas. Devices generally had strong laboratory performance data; however, experience in the field over the years has been mixed. Traditional solar refrigerators relied on relatively expensive battery systems, which have demonstrated short lives compared to the refrigerator. There are now alternatives to the battery-based systems and a clear understanding that solar refrigerator systems need to be designed, installed, and maintained by technicians with the necessary knowledge and training. Thus, the technology is now poised to be the refrigeration method of choice for the cold chain in areas with no electricity or extremely unreliable electricity (less than 4h per average day) and sufficient sunlight. This paper highlights some lessons learned with solar-powered refrigeration, and discusses some critical factors for successful introduction of solar units into immunization programs in the future including: •Sustainable financing mechanisms and incentives for health workers and technicians are in place to support long-term maintenance, repair, and replacement parts. •System design is carried out by qualified solar refrigerator professionals taking into account the conditions at installation sites. •Installation and repair are conducted by well-trained technicians. •Temperature performance is continuously monitored and protocols are in place to act on data that indicate problems. Copyright © 2013 The Authors. Published by Elsevier Ltd.. All rights reserved.

  19. Electric power quarterly: January-March 1988. [Contains glossary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1988-07-22

    The Electric Power Quarterly (EPQ) presents information on electric utilities at the plant level. The information provides the following: cost, quantity, and quality of fossil fuel receipts; net generation; fuel consumption; and fuel stocks. The EPQ contains monthly data and quarterly totals for the reporting quarter. These data are published to provide meaningful, timely, objective, and accurate energy information for a wide audience including Congress, federal, and state agencies; industry; and the general public. In this report, data regarding electric utilities' net generation, fuel consumption, and fuel stocks are presented on a plant-by-plant basis. In addition, quantity, cost, and qualitymore » of fossil-fuel receipts are presented on a plant-by-plant basis for plants with a combined installed nameplate capacity of 50 megawatts or larger.« less

  20. Report on electrocutions, electric shock, and electric burn injuries involving consumer products. final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1984-09-01

    This report provides direction to a project to reduce the number of electrocution, electric shock and electric burn injuries. The first section uses CPSC data to rank the consumer products involved in these accidents on the basis of frequency, severity, and number of products in use. It also analyzes demographic and accident characteristics. The second section contains a technical review of accidents occurring in eight product groups: Portable Power Tools; Welders, Battery Chargers and Inverters; Personal Hygiene Products; Entertainment Products; Lawn and Garden Tools; Installed Stoves, Ranges and Cook Tops; Refrigerators and Freezers; and Fans. This section also includes amore » review of the relevant Underwriters Laboratories (UL) standards and suggestions for potential action to reduce the accidents involving these eight product groups.« less

  1. Automated complex for research of electric drives control

    NASA Astrophysics Data System (ADS)

    Avlasko, P. V.; Antonenko, D. A.

    2018-05-01

    In the article, the automated complex intended for research of various control modes of electric motors including the inductor motor of double-way feed is described. As a basis of the created complex, the National Instruments platform is chosen. The operating controller built in a platform is delivered with an operating system of real-time for creation of systems of measurement and management. The software developed in the environment of LabVIEW consists of several connected modules which are in different elements of a complex. Besides the software for automated management by experimental installation, the program complex is developed for modelling of processes in the electric drive. As a result there is an opportunity to compare simulated and received experimentally transitional characteristics of the electric drive in various operating modes.

  2. Environmental assessment: Kotzebue Wind Installation Project, Kotzebue, Alaska

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-05-01

    The DOE is proposing to provide financial assistance to the Kotzebue Electric Association to expand its existing wind installation near Kotzebue, Alaska. Like many rural Alaska towns, Kotzebue uses diesel-powered generators to produce its electricity, the high cost of which is currently subsidized by the Alaska State government. In an effort to provide a cost effective and clean source of electricity, reduce dependence on diesel fuel, and reduce air pollutants, the DOE is proposing to fund an experimental wind installation to test commercially available wind turbines under Arctic conditions. The results would provide valuable information to other Alaska communities experiencingmore » similar dependence on diesel-powered generators. The environmental assessment for the proposed wind installation assessed impacts to biological resources, land use, electromagnetic interference, coastal zone, air quality, cultural resources, and noise. It was determined that the project does not constitute a major Federal action significantly affecting the quality of the human environment. Therefore, the preparation of an environmental impact statement is not required, and DOE has issued a Finding of No Significant Impact.« less

  3. 33 CFR 159.71 - Electrical controls and conductors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... conductors. 159.71 Section 159.71 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND... Electrical controls and conductors. Electrical controls and conductors must be installed in accordance with good marine practice. Wire must be copper and must be stranded. Electrical controls and conductors must...

  4. 33 CFR 159.71 - Electrical controls and conductors.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... conductors. 159.71 Section 159.71 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND... Electrical controls and conductors. Electrical controls and conductors must be installed in accordance with good marine practice. Wire must be copper and must be stranded. Electrical controls and conductors must...

  5. Job Grading Standard for Electrician (High Voltage) WG-2810.

    ERIC Educational Resources Information Center

    Civil Service Commission, Washington, DC. Bureau of Policies and Standards.

    The standard covers nonsupervisory work involved in installation, test, repair, and maintenance of electric power plant and/or overhead and underground primary electrical distribution systems. These jobs require knowledge and application of electrical principles, procedures, materials, and safety standards governing work on electrical systems…

  6. 77 FR 2928 - Airworthiness Directives; Airbus Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-20

    ... pressure hose and electrical wiring of the green electrical motor pump (EMP). This proposed AD would... for correct condition and installation of hydraulic pressure hoses, electrical conduits, feeder cables... detect and correct chafing of hydraulic pressure hoses and electrical wiring of the green EMPs, which in...

  7. Snapshot of photovoltaics - February 2018

    NASA Astrophysics Data System (ADS)

    Jäger-Waldau, Arnulf

    2018-05-01

    Solar photovoltaic electricity generation is the fastest growing power generation source world-wide. The significant cost reduction of solar PV over the last decade, and the zero fuel cost volatility have increased the attractiveness. In 2017, the newly installed solar PV power of over 90 GW was more than all the world-wide cumulative installed PV capacity until the mid of 2012. China was again the main driver behind this strong growth with more than 50 GW of annual installations in 2017. Apart from the electricity sector, renewable energy sources for the generation of heat and environmental friendly synthetic-fuels for the transport sector will become more and more important in the future.

  8. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Anderson, K.; Markel, T.; Simpson, M.

    The U.S. Army's Fort Carson installation was selected to serve as a prototype for net zero energy assessment and planning. NREL performed the comprehensive assessment to appraise the potential of Fort Carson to achieve net zero energy status through energy efficiency, renewable energy, and electric vehicle integration. This report summarizes the results of the assessment and provides energy recommendations. This study is part of a larger cross-laboratory effort that also includes an assessment of renewable opportunities at seven other DoD Front Range installations, a microgrid design for Fort Carson critical loads and an assessment of regulatory and market-based barriers tomore » a regional secure smart grid.« less

  9. PV systems for remote villages: Service-learning and communal sharing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Duffy, J.; Soper, P.; Prasitpianchai, S.

    1999-07-01

    The remote village of Malvas in the Andes seems typical of many in Peru. The 500 descendants of the Quechua once ruled by the Inca have no electricity, no running water, one telephone, and mud adobe houses. At a 10,000-foot altitude, residents survive with subsistence farming. A group designed and installed a photovoltaic system to provide a vaccine refrigerator, lights, and a transceiver radio system in the town medical clinic last August. They installed light systems in four other town medical clinics in January. This project involves service-learning: combining service with academic subject matter, in this case solar engineering. Keymore » elements of the project also include: letting people define their needs, sustainable infrastructure development, community sharing of installation and virtual ownership (to go along with almost everything else that is shared in common).« less

  10. Environmental impact of coal industry and thermal power plants in India.

    PubMed

    Mishra, U C

    2004-01-01

    Coal is the only natural resource and fossil fuel available in abundance in India. Consequently, it is used widely as a thermal energy source and also as fuel for thermal power plants producing electricity. India has about 90,000 MW installed capacity for electricity generation, of which more than 70% is produced by coal-based thermal power plants. Hydro-electricity contributes about 25%, and the remaining is mostly from nuclear power plants (NPPs). The problems associated with the use of coal are low calorific value and very high ash content. The ash content is as high as 55-60%, with an average value of about 35-40%. Further, most of the coal is located in the eastern parts of the country and requires transportation over long distances, mostly by trains, which run on diesel. About 70% oil is imported and is a big drain on India's hard currency. In the foreseeable future, there is no other option likely to be available, as the nuclear power programme envisages installing 20,000 MWe by the year 2020, when it will still be around 5% of the installed capacity. Hence, attempts are being made to reduce the adverse environmental and ecological impact of coal-fired power plants. The installed electricity generating capacity has to increase very rapidly (at present around 8-10% per annum), as India has one of the lowest per capita electricity consumptions. Therefore, the problems for the future are formidable from ecological, radio-ecological and pollution viewpoints. A similar situation exists in many developing countries of the region, including the People's Republic of China, where coal is used extensively. The paper highlights some of these problems with the data generated in the author's laboratory and gives a brief description of the solutions being attempted. The extent of global warming in this century will be determined by how developing countries like India manage their energy generation plans. Some of the recommendations have been implemented for new plants, and the situation in the new plants is much better. A few coal washeries have also been established. It will be quite some time before the steps to improve the environmental releases are implemented in older plants and several coal mines due to resource constraints.

  11. Distribution System Pricing with Distributed Energy Resources

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hledik, Ryan; Lazar, Jim; Schwartz, Lisa

    Technological changes in the electric utility industry bring tremendous opportunities and significant challenges. Customers are installing clean sources of on-site generation such as rooftop solar photovoltaic (PV) systems. At the same time, smart appliances and control systems that can communicate with the grid are entering the retail market. Among the opportunities these changes create are a cleaner and more diverse power system, the ability to improve system reliability and system resilience, and the potential for lower total costs. Challenges include integrating these new resources in a way that maintains system reliability, provides an equitable sharing of system costs, and avoidsmore » unbalanced impacts on different groups of customers, including those who install distributed energy resources (DERs) and low-income households who may be the least able to afford the transition.« less

  12. Solar Power. Policy Overview and Good Practices

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cox, Sadie; Walters, Terri; Esterly, Sean

    2015-05-01

    As global electricity demand increases, governments are designing and implementing policies to scale up and catalyze renewable energy, which now meets 22% of global electricity demand (REN21 2014). Solar technologies are a critical component of this expanded deployment, and they have experienced unprecedented growth in recent years. As presented in Figure 1, solar prices have decreased significantly over the last decade (REN21 2014) and in 2013, new capacity installation of solar electricity from photovoltaics (PV) 1 surpassed all other renewable energy technologies worldwide—excluding hydropower—with 39 gigawatts installed that year. Concentrating solar thermal power,2 although it still represents a fairly nascentmore » market, also continues to expand as installed capacity increased by 36% in 2013 compared to 2012. In addition to meeting energy demand in an increasingly cost-effective manner, solar deployment can also support critical economic, social, and environmental development goals (Flavin and Hull Aeck, n.d.).« less

  13. 33 CFR 127.1107 - Electrical systems.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false Electrical systems. 127.1107... Waterfront Facilities Handling Liquefied Hazardous Gas Design and Construction § 127.1107 Electrical systems. Electrical equipment and wiring must be of the kind specified by, and must be installed in accordance with...

  14. 33 CFR 127.1107 - Electrical systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Electrical systems. 127.1107... Waterfront Facilities Handling Liquefied Hazardous Gas Design and Construction § 127.1107 Electrical systems. Electrical equipment and wiring must be of the kind specified by, and must be installed in accordance with...

  15. 33 CFR 127.1107 - Electrical systems.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Electrical systems. 127.1107... Waterfront Facilities Handling Liquefied Hazardous Gas Design and Construction § 127.1107 Electrical systems. Electrical equipment and wiring must be of the kind specified by, and must be installed in accordance with...

  16. 33 CFR 127.1107 - Electrical systems.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Electrical systems. 127.1107... Waterfront Facilities Handling Liquefied Hazardous Gas Design and Construction § 127.1107 Electrical systems. Electrical equipment and wiring must be of the kind specified by, and must be installed in accordance with...

  17. 33 CFR 127.1107 - Electrical systems.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false Electrical systems. 127.1107... Waterfront Facilities Handling Liquefied Hazardous Gas Design and Construction § 127.1107 Electrical systems. Electrical equipment and wiring must be of the kind specified by, and must be installed in accordance with...

  18. 46 CFR 169.685 - Electric heating and cooking equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SCHOOL VESSELS Machinery and Electrical Electrical Installations Operating at Potentials of 50 Volts Or... designed as to permit complete cleaning, maintenance, and repair. (c) Doors for electric cooking equipment must be provided with heavy duty hinges and locking devices to prevent accidental opening in heavy seas...

  19. INSTRUMENTATION AND CONTROLS DIVISION ELECTRICAL DESIGN STANDARDS AND GRAPHICAL SYMBOLS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1961-11-01

    Copies are presented of the American Standards Association graphical symbols for electrical and electronic equipment and systems. Recommendations are given for electrical elementary design layout, device codings, etc., for permanent type installations. Electrical diagrams copied from American Drafting Standards Manual are presented. (M.C.G.)

  20. 47 CFR 80.925 - Electric light.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Electric light. 80.925 Section 80.925... MARITIME SERVICES Compulsory Radiotelephone Installations for Small Passenger Boats § 80.925 Electric light. (a) If the vessel is navigated at night an electric light or dial lights which clearly illuminate the...

  1. 47 CFR 80.925 - Electric light.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 5 2014-10-01 2014-10-01 false Electric light. 80.925 Section 80.925... MARITIME SERVICES Compulsory Radiotelephone Installations for Small Passenger Boats § 80.925 Electric light. (a) If the vessel is navigated at night an electric light or dial lights which clearly illuminate the...

  2. 47 CFR 80.925 - Electric light.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Electric light. 80.925 Section 80.925... MARITIME SERVICES Compulsory Radiotelephone Installations for Small Passenger Boats § 80.925 Electric light. (a) If the vessel is navigated at night an electric light or dial lights which clearly illuminate the...

  3. 47 CFR 80.925 - Electric light.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Electric light. 80.925 Section 80.925... MARITIME SERVICES Compulsory Radiotelephone Installations for Small Passenger Boats § 80.925 Electric light. (a) If the vessel is navigated at night an electric light or dial lights which clearly illuminate the...

  4. 47 CFR 80.925 - Electric light.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 5 2013-10-01 2013-10-01 false Electric light. 80.925 Section 80.925... MARITIME SERVICES Compulsory Radiotelephone Installations for Small Passenger Boats § 80.925 Electric light. (a) If the vessel is navigated at night an electric light or dial lights which clearly illuminate the...

  5. Justification of the Utility of Introducing Smart Meters in Latvia

    NASA Astrophysics Data System (ADS)

    Kunickis, M.; Dandens, A.; Bariss, U.

    2015-12-01

    Automatic data reading from smart meters is being developed in many parts of the world, including Latvia. The key drivers for that are developments of smart technologies and economic benefits for consumers. Deployment of smart meters could be launched in a massive scale. Several pilot projects were implemented to verify the feasibility of smart meters for individual consumer groups. Preliminary calculations indicate that installation of smart meters for approximately 23 % of electricity consumers would be economically viable. Currently, the data for the last two years is available for an in-depth mathematical analysis. The continuous analysis of consumption data would be established, when more measurements from smart meters are available. The extent of introduction of smart meters should be specified during this process in order to gain the maximum benefit for the whole society (consumers, grid companies, state authorities), because there are still many uncertain and variable factors. For example, it is necessary to consider statistical load variations by hour, dependence of electricity consumption on temperature fluctuations, consumer behaviour and demand response to market signals to reduce electricity consumption in the short and long term, consumer's ambitions and capability to install home automation for regulation of electricity consumption. To develop the demand response, it is necessary to analyse the whole array of additional factors, such as expected cost reduction of smart meters, possible extension of their functionality, further development of information exchange systems, as well as standard requirements and different political and regulatory decisions regarding the reduction of electricity consumption and energy efficiency.

  6. 30 CFR 75.1101-5 - Installation of foam generator systems.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Installation of foam generator systems. 75.1101...-5 Installation of foam generator systems. (a) Foam generator systems shall be located so as to discharge foam to the belt drive, belt takeup, electrical controls, gear reducing unit and the conveyor belt...

  7. You're a What? Solar Photovoltaic Installer

    ERIC Educational Resources Information Center

    Torpey, Elka Maria

    2009-01-01

    This article talks about solar photovoltaic (PV) installer and features Rebekah Hren, a solar PV installer who puts solar panels on roofs and in other sunny places to turn the sun's power into electricity. Hren enjoys promoting renewable energy, in part because it's an emerging field. In solar PV systems, solar cells--devices that convert sunlight…

  8. 46 CFR 76.27-90 - Installations contracted for prior to November 19, 1952.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., and they are maintained in good condition to the satisfaction of the Officer in Charge, Marine Inspection. Minor repairs and alterations may be made to the same standards as the original installation. (2... VESSELS FIRE PROTECTION EQUIPMENT Electric Fire Detecting System, Details § 76.27-90 Installations...

  9. 46 CFR 76.35-15 - Operation and installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Operation and installation. 76.35-15 Section 76.35-15... EQUIPMENT Manual Alarm System, Details § 76.35-15 Operation and installation. (a) The system shall be so... system. (d) All wiring and electrical circuits and equipment shall meet the applicable requirements of...

  10. 46 CFR 76.30-15 - Operation and installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Operation and installation. 76.30-15 Section 76.30-15... EQUIPMENT Pneumatic Fire Detecting System, Details § 76.30-15 Operation and installation. (a) The system... that it may be incorporated with the manual alarm system. (e) All wiring and electrical circuits and...

  11. 46 CFR 76.25-35 - Operation and installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Operation and installation. 76.25-35 Section 76.25-35... EQUIPMENT Automatic Sprinkling System, Details § 76.25-35 Operation and installation. (a) The system shall... all its components shall be used for no other purpose. (h) All wiring and electrical circuits and...

  12. Real time monitoring system used in route planning for the electric vehicle

    NASA Astrophysics Data System (ADS)

    Ionescu, LM; Mazare, A.; Serban, G.; Ionita, S.

    2017-10-01

    The electric vehicle is a new consumer of electricity that is becoming more and more widespread. Under these circumstances, new strategies for optimizing power consumption and increasing vehicle autonomy must be designed. These must include route planning along with consumption, fuelling points and points of interest. The hardware and software solution proposed by us allows: non-invasive monitoring of power consumption, energy autonomy - it does not add any extra consumption, data transmission to a server and data fusion with the route, the points of interest of the route and the power supply points. As a result: an optimal route planning service will be provided to the driver, considering the route, the requirements of the electric vehicle and the consumer profile. The solution can be easily installed on any type of electric car - it does not involve any intervention on the equipment.

  13. Electric power from sugar cane in Costa Rica. A technical and economic analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tugwell, F.; Gowen, M.; Kenda, W.

    1988-07-01

    A team of specialists visited Costa Rica in May 1988 to analyze the potential for production and sale of electricity by the sugar-cane industry. Focusing on three sugar mills, the team made technical projections at four levels of investment, ranging from the simplest sale of surplus power to the installation of new turbogenerator systems. For each level, capital costs, electricity production and sales, and fuel options were estimated. Associated risks were assessed through sensitivity analyses to demonstrate the possible impacts of varying interest rates, fuel costs, and electricity sales prices. The team concluded that production and sale of electricity formore » the national grid could be an excellent investment opportunity for the sugar industry and would provide important economic benefits, including creation of additional jobs in rural areas, diversification of the sugar industry, and (in the short term) displacement of the need for imported fuels.« less

  14. Renewable Energy Opportunities at the Kanto Installations, Japan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Solana, Amy E.; Horner, Jacob A.; Russo, Bryan J.

    2010-09-24

    This document provides an overview of renewable resource development potential at the U.S. Army installations in the Kanto region in Japan, which includes Camp Zama, Yokohama North Dock, Sagamihara Family Housing Area (SFHA), Sagami General Depot, and Akasaka Press Center. This effort focuses on grid-connected generation of electricity from renewable energy sources and also on ground source heat pumps for heating and cooling buildings. The effort was funded by the Huntsville Army Corps of Engineers, and includes the development of a methodology for renewable resource assessment at Army installations located on foreign soil. The methodology is documented in Renewable Energymore » Assessment Methodology for Japanese OCONUS Army Installations. The site visit to the Kanto installations took place on April 5 and 6, 2010. At the current time, there are some renewable technologies that show economic potential. Because of siting restrictions and the small size of these installations, development of most renewable energy technologies will likely be limited to Camp Zama. Project feasibility is based on installation-specific resource availability and energy costs and projections based on accepted life-cycle cost methods. Development of any renewable energy project will be challenging, as it will require investigation into existing contractual obligations, new contracts that could be developed, the legality of certain partnerships, and available financing avenues, which involves the U.S. Forces Japan (USFJ), the Government of Japan (GOJ), and a number of other parties on both sides. The Army will not be able to implement a project without involvement and approval from the other services and multiple levels of Japanese government. However, implementation of renewable energy projects could be an attractive method for GOJ to reduce greenhouse gas emissions and lower annual utility payments to USFJ. This report recommends projects to pursue and offers approaches to use. The most promising opportunities include waste-to-energy and ground source heat pumps. Solar photovoltaics (PV) may also prove successful. Other resources were found to be insufficient on the Kanto installations.« less

  15. Economic Assessment of Hydrogen Technologies Participating in California Electricity Markets

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Eichman, Joshua; Townsend, Aaron; Melaina, Marc

    As the electric sector evolves and increasing amounts of variable renewable generation are installed on the system, there are greater needs for system flexibility and sufficient capacity, and greater concern for overgeneration from renewable sources not well matched in time with electric loads. Hydrogen systems have the potential to support the grid in each of these areas. However, limited information is available about the economic competitiveness of hydrogen system configurations. This paper quantifies the value for hydrogen energy storage and demand response systems to participate in select California wholesale electricity markets using 2012 data. For hydrogen systems and conventional storagemore » systems (e.g., pumped hydro, batteries), the yearly revenues from energy, ancillary service, and capacity markets are compared to the yearly cost to establish economic competitiveness. Hydrogen systems can present a positive value proposition for current markets. Three main findings include: (1) For hydrogen systems participating in California electricity markets, producing and selling hydrogen was found to be much more valuable than producing and storing hydrogen to later produce electricity; therefore systems should focus on producing and selling hydrogen and opportunistically providing ancillary services and arbitrage. (2) Tighter integration with electricity markets generates greater revenues (i.e., systems that participate in multiple markets receive the highest revenue). (3) More storage capacity, in excess of what is required to provide diurnal shifting, does not increase competitiveness in current California wholesale energy markets. As more variable renewable generation is installed, the importance of long duration storage may become apparent in the energy price or through additional markets, but currently, there is not a sufficiently large price differential between days to generate enough revenue to offset the cost of additional storage. Future work will involve expanding to consider later year data and multiple regions to establish more generalized results.« less

  16. Power Without Wires (POWOW)

    NASA Technical Reports Server (NTRS)

    Brandhorst, Henry W., Jr.; Howell, Joe (Technical Monitor)

    2002-01-01

    Electric propulsion has emerged as a cost-effective solution to a wide range of satellite applications. Deep Space 1 successfully demonstrated electric propulsion as the primary propulsion source for a satellite. The POWOW concept is a solar-electric propelled spacecraft capable of significant cargo and short trip times for traveling to Mars. There it would enter areosynchronous orbit (Mars GEO equivalent) and beam power to surface installations via lasers. The concept has been developed with industrial partner expertise in high efficiency solar cells, advanced concentrator modules, innovative arrays, and high power electric propulsion systems. The present baseline spacecraft design providing 898 kW using technologies expected to be available in 2003 will be described. Areal power densities approaching 350 W/sq m at 80 C operating temperatures and wing level specific powers of over 350 W/kg are projected. Details of trip times and payloads to Mars are presented. Electric propulsion options include Hall, MPD, and ion thrusters of various power levels and trade studies have been conducted to define the most advantageous options. Because the design is modular, learning curve methodology has been applied to determine expected cost reductions and is included.

  17. 14 CFR 23.1163 - Powerplant accessories.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...) Electrical equipment subject to arcing or sparking must be installed to minimize the probability of contact... or more than 6 kilowatts must be designed and installed to minimize the probability of a fire hazard...

  18. 40 CFR 265.192 - Design and installation of new tank systems or components.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... or sacrificial anodes); and (C) Electrical isolation devices such as insulating joints and flanges... stress due to settlement, vibration, expansion or contraction. Note: The piping system installation...

  19. 40 CFR 265.192 - Design and installation of new tank systems or components.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... or sacrificial anodes); and (C) Electrical isolation devices such as insulating joints and flanges... stress due to settlement, vibration, expansion or contraction. Note: The piping system installation...

  20. 40 CFR 265.192 - Design and installation of new tank systems or components.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... or sacrificial anodes); and (C) Electrical isolation devices such as insulating joints and flanges... stress due to settlement, vibration, expansion or contraction. Note: The piping system installation...

  1. 40 CFR 265.192 - Design and installation of new tank systems or components.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... or sacrificial anodes); and (C) Electrical isolation devices such as insulating joints and flanges... stress due to settlement, vibration, expansion or contraction. Note: The piping system installation...

  2. Supermarket refrigeration assessment for the Commonwealth Electric Company

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tsaros, T.L.; Walker, D.H.

    The Commonwealth Electric Company (COM/Electric) has initiated an incentive program to promote electric energy conservation within its service territory. The Electric Power Research Institute (EPRI) has assisted COM/Electric in assessing the impact on the utility and its customers of implementing energy efficient supermarket refrigeration in retrofit applications. The primary task of this assessment was to contact the supermarket chains and refrigeration contractors and suppliers in the COM/Electric service territory to determine the type of refrigeration employed and standard or novel retrofit equipment implemented in supermarkets. With this information, estimates were made of the potential energy savings that COM/Electric and themore » supermarkets could realize if supermarkets were retrofitted with energy efficient refrigeration equipment. It was determined that the refrigerated display case features offering the greatest potential for savings through retrofit installations include doors for medium temperature multideck cases, high-efficiency fan motors, anti-sweat heater controls, and vinyl strip curtains for walk-in coolers. The retrofit components associated with the compressor machine room that offer the greatest potential for savings include the use of low heat pressure control, hot gas defrost, and external liquid-suction heat exchangers and remote evaporative subcoolers for low temperature refrigeration. 6 refs., 14 figs., 26 tabs.« less

  3. Impact of Distribution Feeders that do not have Voltage Regulators on the number of Charged Electric Vehicles using IEEE 34 Bus Test Feeder

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Allehyani, Ahmed; Beshir, Mohammed

    Voltage regulators help maintain an acceptable voltage profile for the system. This paper discusses the effect of installing voltage regulators to the system to fix the voltage drop resulting from the electrical vehicles loading increase when they are being charged. The effect will be studied in the afternoon, when the peak load occurs, using the IEEE 34 bus test feeder. First, only one spot node is used to charge the electric vehicles while a voltage regulator is present. Second, five spot nodes are loaded at the same time to charge the electric vehicles while voltage regulators are installed at eachmore » node. After that, the impact of electric vehicles on distribution feeders that do not have voltage regulators will appear.« less

  4. Hawaii Energy and Environmental Technologies Initiative

    DTIC Science & Technology

    2005-06-01

    include a hydrate synthesis system, benthic pressure chambers to simulate deep seafloor sediment, and specialized instrumentation for high pressure...the high probability that a sulfide/oxygen microbial fuel cell can generate electricity in deep ocean sediments, and that prolonged power generation may...hydrogen generation (using an electrolyser) and storage, and on-line high -resolution gas analysis. In addition to installation and commissioning of

  5. Energy Security of Army Installations & Islanding Methodologies

    DTIC Science & Technology

    2012-01-16

    islanding of energy generation and distribution networks including electricity, natural gas , steam , liquid fuel, water, and others for the diverse...in geopolitics and war/peace/terrorism Breakthrough in reformation process of synthetic fuel production Hydrogen focused energy sector Oil and gas ...of synthetic AMf Q production Hydrogen focused energy sector D Of and gas remain available and cost-effective Natural Gas prices cut In

  6. 46 CFR 111.95-7 - Wiring of boat winch components.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-7 Wiring of boat winch... electric installation from all sources of potential. The switch must be in series with and on the supply...

  7. 46 CFR 111.95-7 - Wiring of boat winch components.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-7 Wiring of boat winch... electric installation from all sources of potential. The switch must be in series with and on the supply...

  8. 46 CFR 111.95-7 - Wiring of boat winch components.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-7 Wiring of boat winch... electric installation from all sources of potential. The switch must be in series with and on the supply...

  9. 46 CFR 111.95-7 - Wiring of boat winch components.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-7 Wiring of boat winch... electric installation from all sources of potential. The switch must be in series with and on the supply...

  10. 13 CFR 107.50 - Definition of terms.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., electric transmission systems, storage systems, and cyber security. (2) Installation and/or inspection... distribution systems, electric transmission systems, or grid cyber security. (3) Auditing or consulting...

  11. 13 CFR 107.50 - Definition of terms.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., electric transmission systems, storage systems, and cyber security. (2) Installation and/or inspection... distribution systems, electric transmission systems, or grid cyber security. (3) Auditing or consulting...

  12. Designing Predictive Diagnose Method for Insulation Resistance Degradation of the Electrical Power Cables from Neutral Insulated Power Networks

    NASA Astrophysics Data System (ADS)

    Dobra, R.; Pasculescu, D.; Risteiu, M.; Buica, G.; Jevremović, V.

    2017-06-01

    This paper describe some possibilities to minimize voltages switching-off risks from the mining power networks, in case of insulated resistance faults by using a predictive diagnose method. The cables from the neutral insulated power networks (underground mining) are designed to provide a flexible electrical connection between portable or mobile equipment and a point of supply, including main feeder cable for continuous miners, pump cable, and power supply cable. An electronic protection for insulated resistance of mining power cables can be made using this predictive strategy. The main role of electronic relays for insulation resistance degradation of the electrical power cables, from neutral insulated power networks, is to provide a permanent measurement of the insulated resistance between phases and ground, in order to switch-off voltage when the resistance value is below a standard value. The automat system of protection is able to signalize the failure and the human operator will be early informed about the switch-off power and will have time to take proper measures to fix the failure. This logic for fast and automat switch-off voltage without aprioristic announcement is suitable for the electrical installations, realizing so a protection against fires and explosion. It is presented an algorithm and an anticipative relay for insulated resistance control from three-phase low voltage installations with insulated neutral connection.

  13. The design, development, and implementation of a data acquisition and handling system at Basin Electric Power Cooperative

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Baranowski, S.T.; Culp, L.R.; Jonas, T.S.

    1995-12-31

    The Clean Air Act Amendments of 1990 require all Phase 1 and 2 utilities to install Continuous Emissions Monitoring Systems (CEMS), which can consist of instrumentation including analyzers and a Data Acquisition and Handling System (DAHS). To meet these requirements, Basin Electric Power Cooperative contracted with Black and Veatch to design and develop a DAHS which would meet all 40 CFR Part 75 requirements. Basin Electric provided the specifications for the DAHS and the graphical user interface, and B and V designed, developed, and installed a DAHS at 3 units at Laramie River Station, 2 units at Antelope Valley Station,more » and 2 units at Leland Olds Station. B and V utilized the existing equipment, adding to it a unique DAHS design. B and V designed and implemented the DAHS which operates in the OS/2 environment to interface with multiple programmable logic controllers. This unique software was written in modular form so that multiple programs run in unison, monitoring each other for errors to ensure continuous operation. The reporting structure is flexible to allow for a variety of formats, including those specifically required by the state to meet CAAA guidelines. Today, these seven units are in operation and comply with the CAAA. This paper describes the issues faced during specification, general design, compliance, and implementation of the DAHS at BEPC, including the lessons learned. The continuous emissions monitoring (CEM) system for each unit at BEPC consisted of a set of dilution probe analyzers for measuring SO{sub 2}, NO{sub x}, and CO{sub 2}.« less

  14. 46 CFR 154.1010 - Electrical equipment in gas-dangerous space or zone.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Electrical equipment in gas-dangerous space or zone. 154..., Construction and Equipment Electrical § 154.1010 Electrical equipment in gas-dangerous space or zone. (a) Except as allowed in this section, electrical equipment must not be installed in a gas-dangerous space or...

  15. 46 CFR 154.1010 - Electrical equipment in gas-dangerous space or zone.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 5 2013-10-01 2013-10-01 false Electrical equipment in gas-dangerous space or zone. 154..., Construction and Equipment Electrical § 154.1010 Electrical equipment in gas-dangerous space or zone. (a) Except as allowed in this section, electrical equipment must not be installed in a gas-dangerous space or...

  16. 46 CFR 154.1010 - Electrical equipment in gas-dangerous space or zone.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 5 2011-10-01 2011-10-01 false Electrical equipment in gas-dangerous space or zone. 154..., Construction and Equipment Electrical § 154.1010 Electrical equipment in gas-dangerous space or zone. (a) Except as allowed in this section, electrical equipment must not be installed in a gas-dangerous space or...

  17. 46 CFR 105.20-10 - Pumps.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... discharge side of pump if the pressure under shutoff conditions exceeds 60 pounds. When a relief valve is installed, it shall discharge back to the suction of the pump. (c) Where electric motors are installed with...

  18. 46 CFR 32.20-1 - Equipment installations on vessels during World War II-TB/ALL.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 1 2012-10-01 2012-10-01 false Equipment installations on vessels during World War II-TB/ALL. 32.20-1 Section 32.20-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS... installations on vessels during World War II—TB/ALL. Boilers, pressure vessels, machinery, piping, electrical...

  19. 46 CFR 32.20-1 - Equipment installations on vessels during World War II-TB/ALL.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 1 2013-10-01 2013-10-01 false Equipment installations on vessels during World War II-TB/ALL. 32.20-1 Section 32.20-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS... installations on vessels during World War II—TB/ALL. Boilers, pressure vessels, machinery, piping, electrical...

  20. 46 CFR 32.20-1 - Equipment installations on vessels during World War II-TB/ALL.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 1 2014-10-01 2014-10-01 false Equipment installations on vessels during World War II-TB/ALL. 32.20-1 Section 32.20-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS... installations on vessels during World War II—TB/ALL. Boilers, pressure vessels, machinery, piping, electrical...

  1. 46 CFR 32.20-1 - Equipment installations on vessels during World War II-TB/ALL.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 1 2011-10-01 2011-10-01 false Equipment installations on vessels during World War II-TB/ALL. 32.20-1 Section 32.20-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS... installations on vessels during World War II—TB/ALL. Boilers, pressure vessels, machinery, piping, electrical...

  2. 75 FR 81508 - Airworthiness Directives; The Boeing Company Model 777-200, -200LR, -300, and -300ER Series...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-28

    ... require installing new panels in the main equipment center, making certain wiring changes, installing new..., Boeing found indications of wiring deterioration that could cause electrical faults in the main tank... center; making certain wiring changes; installing new GFI relays in the P301 and P302 panels; and...

  3. Economic Analysis Case Studies of Battery Energy Storage with SAM

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DiOrio, Nicholas; Dobos, Aron; Janzou, Steven

    2015-11-01

    Interest in energy storage has continued to increase as states like California have introduced mandates and subsidies to spur adoption. This energy storage includes customer sited behind-the-meter storage coupled with photovoltaics (PV). This paper presents case study results from California and Tennessee, which were performed to assess the economic benefit of customer-installed systems. Different dispatch strategies, including manual scheduling and automated peak-shaving were explored to determine ideal ways to use the storage system to increase the system value and mitigate demand charges. Incentives, complex electric tariffs, and site specific load and PV data were used to perform detailed analysis. Themore » analysis was performed using the free, publically available System Advisor Model (SAM) tool. We find that installation of photovoltaics with a lithium-ion battery system priced at $300/kWh in Los Angeles under a high demand charge utility rate structure and dispatched using perfect day-ahead forecasting yields a positive net-present value, while all other scenarios cost the customer more than the savings accrued. Different dispatch strategies, including manual scheduling and automated peak-shaving were explored to determine ideal ways to use the storage system to increase the system value and mitigate demand charges. Incentives, complex electric tariffs, and site specific load and PV data were used to perform detailed analysis. The analysis was performed using the free, publically available System Advisor Model (SAM) tool. We find that installation of photovoltaics with a lithium-ion battery system priced at $300/kWh in Los Angeles under a high demand charge utility rate structure and dispatched using perfect day-ahead forecasting yields a positive net-present value, while all other scenarios cost the customer more than the savings accrued.« less

  4. Sunshade for building exteriors

    DOEpatents

    Braunstein, Richard; McKenna, Gregory B.; Hewitt, David W.; Harper, Randolph S.

    2002-01-01

    A sunshade for shading window exteriors includes at least one connecting bracket for attachment to a window mullion, a blade support strut attached to the connecting bracket at a first joint, and a plurality of louvered blades supported by the blade support strut at a second joint. The pivot angle at the first joint may be varied to extend the louvered blades a desired distance from the window mullion. The louvered blades are positioned at a preselected fixed profile angle on the second joint in order to optimize shading at the latitude where the sunshade is installed. In a preferred embodiment, the louvered blades have top walls supporting photovoltaic cells and the sunshade includes electric cables for connecting the photovoltaic cells to an electric circuit.

  5. Energy-Water Nexus Relevant to Baseload Electricity Source Including Mini/Micro Hydropower Generation

    NASA Astrophysics Data System (ADS)

    Fujii, M.; Tanabe, S.; Yamada, M.

    2014-12-01

    Water, food and energy is three sacred treasures that are necessary for human beings. However, recent factors such as population growth and rapid increase in energy consumption have generated conflicting cases between water and energy. For example, there exist conflicts caused by enhanced energy use, such as between hydropower generation and riverine ecosystems and service water, between shale gas and ground water, between geothermal and hot spring water. This study aims to provide quantitative guidelines necessary for capacity building among various stakeholders to minimize water-energy conflicts in enhancing energy use. Among various kinds of renewable energy sources, we target baseload sources, especially focusing on renewable energy of which installation is required socially not only to reduce CO2 and other greenhouse gas emissions but to stimulate local economy. Such renewable energy sources include micro/mini hydropower and geothermal. Three municipalities in Japan, Beppu City, Obama City and Otsuchi Town are selected as primary sites of this study. Based on the calculated potential supply and demand of micro/mini hydropower generation in Beppu City, for example, we estimate the electricity of tens through hundreds of households is covered by installing new micro/mini hydropower generation plants along each river. However, the result is based on the existing infrastructures such as roads and electric lines. This means that more potentials are expected if the local society chooses options that enhance the infrastructures to increase micro/mini hydropower generation plants. In addition, further capacity building in the local society is necessary. In Japan, for example, regulations by the river law and irrigation right restrict new entry by actors to the river. Possible influences to riverine ecosystems in installing new micro/mini hydropower generation plants should also be well taken into account. Deregulation of the existing laws relevant to rivers and further incentives for business owners of micro/mini hydropower generation along with current feed-in tariff are required if our society choose an option to enhance the renewable energy.

  6. Energy System and Thermoeconomic Analysis of Combined Heat and Power High Temperature Proton Exchange Membrane Fuel Cell Systems for Light Commercial Buildings

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Colella, Whitney G.; Pilli, Siva Prasad

    2015-06-01

    The United States (U.S.) Department of Energy (DOE)’s Pacific Northwest National Laboratory (PNNL) is spearheading a program with industry to deploy and independently monitor five kilowatt-electric (kWe) combined heat and power (CHP) fuel cell systems (FCSs) in light commercial buildings. This publication discusses results from PNNL’s research efforts to independently evaluate manufacturer-stated engineering, economic, and environmental performance of these CHP FCSs at installation sites. The analysis was done by developing parameters for economic comparison of CHP installations. Key thermodynamic terms are first defined, followed by an economic analysis using both a standard accounting approach and a management accounting approach. Keymore » economic and environmental performance parameters are evaluated, including (1) the average per unit cost of the CHP FCSs per unit of power, (2) the average per unit cost of the CHP FCSs per unit of energy, (3) the change in greenhouse gas (GHG) and air pollution emissions with a switch from conventional power plants and furnaces to CHP FCSs; (4) the change in GHG mitigation costs from the switch; and (5) the change in human health costs related to air pollution. From the power perspective, the average per unit cost per unit of electrical power is estimated to span a range from $15–19,000/ kilowatt-electric (kWe) (depending on site-specific changes in installation, fuel, and other costs), while the average per unit cost of electrical and heat recovery power varies between $7,000 and $9,000/kW. From the energy perspective, the average per unit cost per unit of electrical energy ranges from $0.38 to $0.46/kilowatt-hour-electric (kWhe), while the average per unit cost per unit of electrical and heat recovery energy varies from $0.18 to $0.23/kWh. These values are calculated from engineering and economic performance data provided by the manufacturer (not independently measured data). The GHG emissions were estimated to decrease by one-third by shifting from a conventional energy system to a CHP FCS system. The GHG mitigation costs were also proportional to the changes in the GHG gas emissions. Human health costs were estimated to decrease significantly with a switch from a conventional system to a CHP FCS system.« less

  7. Project Fever - Fostering Electric Vehicle Expansion in the Rockies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Swalnick, Natalia

    2013-06-30

    Project FEVER (Fostering Electric Vehicle Expansion in the Rockies) is a part of the Clean Cities Community Readiness and Planning for Plug-in Electric Vehicles and Charging Infrastructure Funding Opportunity funded by the U.S. Department of Energy (DOE) for the state of Colorado. Tasks undertaken in this project include: Electric Vehicle Grid Impact Assessment; Assessment of Electrical Permitting and Inspection for EV/EVSE (electric vehicle/electric vehicle supply equipment); Assessment of Local Ordinances Pertaining to Installation of Publicly Available EVSE;Assessment of Building Codes for EVSE; EV Demand and Energy/Air Quality Impacts Assessment; State and Local Policy Assessment; EV Grid Impact Minimization Efforts; Unificationmore » and Streamlining of Electrical Permitting and Inspection for EV/EVSE; Development of BMP for Local EVSE Ordinances; Development of BMP for Building Codes Pertaining to EVSE; Development of Colorado-Specific Assessment for EV/EVSE Energy/Air Quality Impacts; Development of State and Local Policy Best Practices; Create Final EV/EVSE Readiness Plan; Develop Project Marketing and Communications Elements; Plan and Schedule In-person Education and Outreach Opportunities.« less

  8. 46 CFR 110.30-1 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Testing and Inspection... vessels in other parts of this chapter. (b) In the inspection of electric equipment and installations, the...) This subpart must not be construed to imply that shop tests or factory inspections of electric...

  9. 46 CFR 110.30-1 - General.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Testing and Inspection... vessels in other parts of this chapter. (b) In the inspection of electric equipment and installations, the...) This subpart must not be construed to imply that shop tests or factory inspections of electric...

  10. 46 CFR 110.30-1 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Testing and Inspection... vessels in other parts of this chapter. (b) In the inspection of electric equipment and installations, the...) This subpart must not be construed to imply that shop tests or factory inspections of electric...

  11. 33 CFR 183.5 - Incorporation by reference.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Plastics § 183.114 Institute of Electrical and Electronics, Engineers, Inc., 445 Hoes Lane, Piscataway, NJ 08854: IEEE 45 IEEE Recommended Practice for Electrical Installations on Shipboard—1983. Cable... Council, Inc., 3069 Solomons Island Road, Edgewater, Maryland 21037-1416: ABYC A-16 Electric Navigation...

  12. 33 CFR 183.5 - Incorporation by reference.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Plastics § 183.114 Institute of Electrical and Electronics, Engineers, Inc., 445 Hoes Lane, Piscataway, NJ 08854: IEEE 45 IEEE Recommended Practice for Electrical Installations on Shipboard—1983. Cable... Council, Inc., 3069 Solomons Island Road, Edgewater, Maryland 21037-1416: ABYC A-16 Electric Navigation...

  13. 33 CFR 183.5 - Incorporation by reference.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Plastics § 183.114 Institute of Electrical and Electronics, Engineers, Inc., 445 Hoes Lane, Piscataway, NJ 08854: IEEE 45 IEEE Recommended Practice for Electrical Installations on Shipboard—1983. Cable... Council, Inc., 3069 Solomons Island Road, Edgewater, Maryland 21037-1416: ABYC A-16 Electric Navigation...

  14. 33 CFR 183.5 - Incorporation by reference.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Plastics § 183.114 Institute of Electrical and Electronics, Engineers, Inc., 445 Hoes Lane, Piscataway, NJ 08854: IEEE 45 IEEE Recommended Practice for Electrical Installations on Shipboard—1983. Cable... Council, Inc., 3069 Solomons Island Road, Edgewater, Maryland 21037-1416: ABYC A-16 Electric Navigation...

  15. 14 CFR 25.1713 - Fire protection: EWIS.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Electrical Wiring Interconnection Systems (EWIS) § 25.1713... used during emergency procedures must be fire resistant. (c) Insulation on electrical wire and electrical cable, and materials used to provide additional protection for the wire and cable, installed in...

  16. 75 FR 16676 - Airworthiness Standards; Electrical and Electronic System Lightning Protection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-02

    ... systems that allow them to operate into instrument meteorological conditions (IMC), where lightning... 27 standards that operate in VFR-only operations with electrical or electronic systems installed for... Airworthiness Standards; Electrical and Electronic System Lightning Protection AGENCY: Federal Aviation...

  17. 46 CFR 183.330 - Distribution panels and switchboards.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.330... vessel's wiring, must not have any electrically unshielded or uninsulated surfaces. (j) Switchboards and...

  18. Study of seismic response and vibration control of High voltage electrical equipment damper based on TMD

    NASA Astrophysics Data System (ADS)

    Liu, Chuncheng; Wang, Chongyang; Mao, Long; Zha, Chuanming

    2016-11-01

    Substation high voltage electrical equipment such as mutual inductor, circuit interrupter, disconnecting switch, etc., has played a key role in maintaining the normal operation of the power system. When the earthquake disaster, the electrical equipment of the porcelain in the transformer substation is the most easily to damage, causing great economic losses. In this paper, using the method of numerical analysis, the establishment of a typical high voltage electrical equipment of three dimensional finite element model, to study the seismic response of a typical SF6 circuit breaker, at the same time, analysis and contrast the installation ring tuned mass damper (TMD damper for short), by changing the damper damping coefficient and the mass block, install annular TMD vibration control effect is studied. The results of the study for guiding the seismic design of high voltage electrical equipment to provide valuable reference.

  19. How to increase the efficiency of the electrical discharge method for destruction of nonconductive solid materials

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Voitenko, N. V., E-mail: tevn@hvd.tpu.ru; Yudin, A. S.; Kuznetsova, N. S.

    The paper deals with the relevance of using electrical discharge technology for construction works in the city. The technical capabilities of the installation for the multi-borehole electro-discharge splitting off and destruction of rocks and concrete are described. The ways to increase the efficiency of the electrical discharge method for the destruction of solids are proposed. In order to augment the discharge circuit energy, the energy storage is separated into two individual capacitor batteries. The throttle with the inductance of 28.6 μH is installed in one of the batteries, which increases the duration of the channel energy release to 400 μsmore » and the efficiency of electrical discharge splitting off of concrete.« less

  20. Cassini's RTGs undergo mechanical and electrical verification tests in the PHSF

    NASA Technical Reports Server (NTRS)

    1997-01-01

    This radioisotope thermoelectric generator (RTG), at center, is ready for electrical verification testing now that it has been installed on the Cassini spacecraft in the Payload Hazardous Servicing Facility. A handling fixture, at far left, remains attached. This is the third and final RTG to be installed on Cassini for the prelaunch tests. The RTGs will provide electrical power to Cassini on its 6.7-year trip to the Saturnian system and during its four-year mission at Saturn. RTGs use heat from the natural decay of plutonium to generate electric power. The generators enable spacecraft to operate at great distances from the Sun where solar power systems are not feasible. The Cassini mission is targeted for an Oct. 6 launch aboard a Titan IVB/Centaur expendable launch vehicle.

  1. The Business Case for Fuel Cells: Delivering Sustainable Value

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Curtin, Sandra; Gangi, Jennifer

    This report, written and compiled by Argonne National Laboratory and the Fuel Cell and Hydrogen Energy Association with support from the Fuel Cell Technologies Office, provides an overview of private sector fuel cell installations at U.S. businesses as of December 31, 2016. Over the past few decades, hundreds of thousands of fuel cells have been installed around the world, for primary or backup power, as well as in various other applications including portable and emergency backup power. Fuel cells have also been deployed in other applications such as heat and electricity for homes and apartments, material handling, passenger vehicles, buses,more » and remote, off-grid sites.« less

  2. The Zond Victory Garden Phase 4 windfarm: A planning, installation, and performance case study. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chapman, J.

    1994-07-01

    This is one of a series of reports that document the steps taken to plan and install a utility-scale windfarm and follow its energy production performance. The reports are intended to help utility planners and others better understand the issues involved in installing and operating a windfarm. This report describes the Zond Victory Garden Phase IV (VGIV) windfarm in the Tehachapi mountain region, 100 miles north of Los Angeles. The Victory Garden series of windfarms were planned and installed and are operated by Zond Systems, Inc. of Tehachapi, California. The VGIV installation, which became operational in stages from January throughmore » June 1990, consists of 98 Vestas V27--225 wind turbines. The total rated capacity is 22 MW with a projected annual average net energy production of 54.3 million kWh/yr, equivalent to an annual capacity factor of 0.28. This energy projection, based on extensive wind resource measurements and an average wind turbine availability of 97%, includes the effects of a number of operational loss factors. The report includes descriptions of the windfarm layout, the wind turbine component, and the electrical layout. Particular attention is paid to one of the most important issues in implementing a windfarm, namely, the wind resource assessment and its use in projecting and updating the expected annual-average energy production of the facility. Also included are details of the planning, construction, and commissioning of the windfarm along with a description of the operations and maintenance procedures employed.« less

  3. Utilization requirements. A southern California Gas Company project SAGE report: Utilization requirements

    NASA Technical Reports Server (NTRS)

    Barbieri, R. H.; Schoen, R.; Hirshberg, A. S.

    1978-01-01

    Utilization requirements are given and comparisons made of two phase III SAGE (solar assisted gas energy) installations in California: (1) a retrofit installation in an existing apartment building in El Toro, and (2) an installation in a new apartment building in Upland. Such testing in the field revealed the requirements to be met if SAGE-type installations are to become commercially practical on a widespread basis in electric and gas energy usage.

  4. Magnetron sputtering source

    DOEpatents

    Makowiecki, Daniel M.; McKernan, Mark A.; Grabner, R. Fred; Ramsey, Philip B.

    1994-01-01

    A magnetron sputtering source for sputtering coating substrates includes a high thermal conductivity electrically insulating ceramic and magnetically attached sputter target which can eliminate vacuum sealing and direct fluid cooling of the cathode assembly. The magnetron sputtering source design results in greater compactness, improved operating characteristics, greater versatility, and low fabrication cost. The design easily retrofits most sputtering apparatuses and provides for safe, easy, and cost effective target replacement, installation, and removal.

  5. Project demonstration of wind turbine electricity: Interconnecting a northern Michigan fruit farm with a major utility

    NASA Astrophysics Data System (ADS)

    Amon, D. M.

    1982-10-01

    A project to interconnect a farm wind turbine with a utility is reported. Included are a summary of accomplishments and daily major events, correspondence relevant to the project (letters explaining the delay of installation, extending the period of performance, tax credits, net energy sellback legislation, etc.), publicity, legal aspects, maintenance and repair, analysis of test data, and accounting.

  6. High conductance surge cable

    DOEpatents

    Murray, M.M.; Wilfong, D.H.; Lomax, R.E.

    1998-12-08

    An electrical cable for connecting transient voltage surge suppressors to electrical power panels. A strip of electrically conductive foil defines a longitudinal axis, with a length of an electrical conductor electrically attached to the metallic foil along the longitudinal axis. The strip of electrically conductive foil and the length of an electrical conductor are covered by an insulating material. For impedance matching purposes, triangular sections can be removed from the ends of the electrically conductive foil at the time of installation. 6 figs.

  7. 46 CFR 169.669 - Radiotelephone equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Machinery and Electrical Electrical Installations Operating at Potentials of Less Than 50 Volts on Vessels of Less Than 100 Gross Tons § 169.669 Radiotelephone equipment. A separate circuit from the...

  8. 25 CFR 175.23 - Customer responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... National Electrical Code of the National Board of Fire Underwriters for Electric Wiring and Apparatus as they apply to the installation and operation of customer-owned equipment; (b) Be responsible for...

  9. 24 CFR 3280.708 - Exhaust duct system and provisions for the future installation of a clothes dryer.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... for the future installation of a clothes dryer. 3280.708 Section 3280.708 Housing and Urban... duct system and provisions for the future installation of a clothes dryer. (a) Clothes dryers. (1) All gas and electric clothes dryers shall be exhausted to the outside by a moisture-lint exhaust duct and...

  10. 24 CFR 3280.708 - Exhaust duct system and provisions for the future installation of a clothes dryer.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... for the future installation of a clothes dryer. 3280.708 Section 3280.708 Housing and Urban... duct system and provisions for the future installation of a clothes dryer. (a) Clothes dryers. (1) All gas and electric clothes dryers shall be exhausted to the outside by a moisture-lint exhaust duct and...

  11. 24 CFR 3280.708 - Exhaust duct system and provisions for the future installation of a clothes dryer.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... for the future installation of a clothes dryer. 3280.708 Section 3280.708 Housing and Urban... duct system and provisions for the future installation of a clothes dryer. (a) Clothes dryers. (1) All gas and electric clothes dryers shall be exhausted to the outside by a moisture-lint exhaust duct and...

  12. 24 CFR 3280.708 - Exhaust duct system and provisions for the future installation of a clothes dryer.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... for the future installation of a clothes dryer. 3280.708 Section 3280.708 Housing and Urban... duct system and provisions for the future installation of a clothes dryer. (a) Clothes dryers. (1) All gas and electric clothes dryers shall be exhausted to the outside by a moisture-lint exhaust duct and...

  13. 33 CFR 149.409 - How many fire extinguishers are needed?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... turbine engines B-II One for each engine. 2 (6) Open electric motors and generators C-II One for each of... fixed system is installed. 2 If the engine is installed on a weather deck or is open to the atmosphere... fans, are exempt. 4 Not required if a fixed foam system is installed in accordance with 46 CFR 108.489. ...

  14. 33 CFR 149.409 - How many fire extinguishers are needed?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... turbine engines B-II One for each engine. 2 (6) Open electric motors and generators C-II One for each of... fixed system is installed. 2 If the engine is installed on a weather deck or is open to the atmosphere... fans, are exempt. 4 Not required if a fixed foam system is installed in accordance with 46 CFR 108.489...

  15. 33 CFR 149.409 - How many fire extinguishers are needed?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... turbine engines B-II One for each engine. 2 (6) Open electric motors and generators C-II One for each of... fixed system is installed. 2 If the engine is installed on a weather deck or is open to the atmosphere... fans, are exempt. 4 Not required if a fixed foam system is installed in accordance with 46 CFR 108.489. ...

  16. 33 CFR 149.409 - How many fire extinguishers are needed?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... turbine engines B-II One for each engine. 2 (6) Open electric motors and generators C-II One for each of... fixed system is installed. 2 If the engine is installed on a weather deck or is open to the atmosphere... fans, are exempt. 4 Not required if a fixed foam system is installed in accordance with 46 CFR 108.489...

  17. 33 CFR 149.409 - How many fire extinguishers are needed?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... turbine engines B-II One for each engine. 2 (6) Open electric motors and generators C-II One for each of... fixed system is installed. 2 If the engine is installed on a weather deck or is open to the atmosphere... fans, are exempt. 4 Not required if a fixed foam system is installed in accordance with 46 CFR 108.489. ...

  18. 46 CFR 129.510 - Lifeboat winches.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Lifeboat winches. 129.510 Section 129.510 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Miscellaneous Electrical Systems § 129.510 Lifeboat winches. Each lifeboat winch operated by electric power must...

  19. 46 CFR 129.510 - Lifeboat winches.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Lifeboat winches. 129.510 Section 129.510 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Miscellaneous Electrical Systems § 129.510 Lifeboat winches. Each lifeboat winch operated by electric power must...

  20. 49 CFR 236.301 - Where signals shall be provided.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 236.301 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD... over a hand-operated switch into interlocking limits if the switch is provided with an electric lock..., electrically. Electric locks installed under this rule must conform to the time and approach locking...

  1. Fuel Cells Provide Reliable Power to U.S. Postal Service Facility in Anchorage, Alaska

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Parker, Steven

    2003-01-01

    Working together, the U.S. Postal Service (USPS) and Chugach Electric Association, partnering with the Department of Defense (DOD), Department of Energy (DOE), US Army Corps of Engineers Construction Engineering Research Laboratories (USA CERL), Electric Power Research Institute (EPRI), and National Rural Electric Cooperative Association (NRECA), developed and installed one of the largest fuel cell installations in the world. The one-megawatt fuel cell combined heat and power plant sits behind the Anchorage U.S. Postal Service Mail Processing and Distribution Facility. Chugach Electric owns, operates, and maintains the fuel cell power plant, which provides clean, reliable power to the USPS facility. Inmore » addition, heat recovered from the fuel cells, in the form of hot water, is used to heat the USPS Mail Processing and Distribution Facility. By taking a leadership role, the USPS will save over $800,000 in electricity and natural gas costs over the 5 1/2-year contract term with Chugach Electric.« less

  2. Energy regeneration model of self-consistent field of electron beams into electric power*

    NASA Astrophysics Data System (ADS)

    Kazmin, B. N.; Ryzhov, D. R.; Trifanov, I. V.; Snezhko, A. A.; Savelyeva, M. V.

    2016-04-01

    We consider physic-mathematical models of electric processes in electron beams, conversion of beam parameters into electric power values and their transformation into users’ electric power grid (onboard spacecraft network). We perform computer simulation validating high energy efficiency of the studied processes to be applied in the electric power technology to produce the power as well as electric power plants and propulsion installation in the spacecraft.

  3. Route 130 bridge snowfree installation electrical analysis and recommendations.

    DOT National Transportation Integrated Search

    1998-02-01

    Results of an experimental investigation on the properties of a snowfree installation for a bridge deck : are reported. The New Jersey Department of Transportation has contracted the Superior Graphite : Company to provide a heated pavement system for...

  4. 30 CFR 817.180 - Utility installations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PERMANENT PROGRAM PERFORMANCE STANDARDS PERMANENT PROGRAM PERFORMANCE STANDARDS-UNDERGROUND MINING ACTIVITIES § 817.180 Utility installations. All underground mining activities shall be conducted in a manner...; oil, gas, and coal-slurry pipelines, railroads; electric and telephone lines; and water and sewage...

  5. Geothermal Energy: Prospects and Problems

    ERIC Educational Resources Information Center

    Ritter, William W.

    1973-01-01

    An examination of geothermal energy as a means of increasing the United States power resources with minimal pollution problems. Developed and planned geothermal-electric power installations around the world, capacities, installation dates, etc., are reviewed. Environmental impact, problems, etc. are discussed. (LK)

  6. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dillon, Heather E.; Antonopoulos, Chrissi A.; Solana, Amy E.

    As the model energy codes are improved to reach efficiency levels 50 percent greater than current codes, use of on-site renewable energy generation is likely to become a code requirement. This requirement will be needed because traditional mechanisms for code improvement, including envelope, mechanical and lighting, have been pressed to the end of reasonable limits. Research has been conducted to determine the mechanism for implementing this requirement (Kaufman 2011). Kaufmann et al. determined that the most appropriate way to structure an on-site renewable requirement for commercial buildings is to define the requirement in terms of an installed power density permore » unit of roof area. This provides a mechanism that is suitable for the installation of photovoltaic (PV) systems on future buildings to offset electricity and reduce the total building energy load. Kaufmann et al. suggested that an appropriate maximum for the requirement in the commercial sector would be 4 W/ft{sup 2} of roof area or 0.5 W/ft{sup 2} of conditioned floor area. As with all code requirements, there must be an alternative compliance path for buildings that may not reasonably meet the renewables requirement. This might include conditions like shading (which makes rooftop PV arrays less effective), unusual architecture, undesirable roof pitch, unsuitable building orientation, or other issues. In the short term, alternative compliance paths including high performance mechanical equipment, dramatic envelope changes, or controls changes may be feasible. These options may be less expensive than many renewable systems, which will require careful balance of energy measures when setting the code requirement levels. As the stringency of the code continues to increase however, efficiency trade-offs will be maximized, requiring alternative compliance options to be focused solely on renewable electricity trade-offs or equivalent programs. One alternate compliance path includes purchase of Renewable Energy Credits (RECs). Each REC represents a specified amount of renewable electricity production and provides an offset of environmental externalities associated with non-renewable electricity production. The purpose of this paper is to explore the possible issues with RECs and comparable alternative compliance options. Existing codes have been examined to determine energy equivalence between the energy generation requirement and the RECs alternative over the life of the building. The price equivalence of the requirement and the alternative are determined to consider the economic drivers for a market decision. This research includes case studies that review how the few existing codes have incorporated RECs and some of the issues inherent with REC markets. Section 1 of the report reviews compliance options including RECs, green energy purchase programs, shared solar agreements and leases, and other options. Section 2 provides detailed case studies on codes that include RECs and community based alternative compliance methods. The methods the existing code requirements structure alternative compliance options like RECs are the focus of the case studies. Section 3 explores the possible structure of the renewable energy generation requirement in the context of energy and price equivalence. The price of RECs have shown high variation by market and over time which makes it critical to for code language to be updated frequently for a renewable energy generation requirement or the requirement will not remain price-equivalent over time. Section 4 of the report provides a maximum case estimate for impact to the PV market and the REC market based on the Kaufmann et al. proposed requirement levels. If all new buildings in the commercial sector complied with the requirement to install rooftop PV arrays, nearly 4,700 MW of solar would be installed in 2012, a major increase from EIA estimates of 640 MW of solar generation capacity installed in 2009. The residential sector could contribute roughly an additional 2,300 MW based on the same code requirement levels of 4 W/ft{sup 2} of roof area. Section 5 of the report provides a basic framework for draft code language recommendations based on the analysis of the alternative compliance levels.« less

  7. Electromagnetic compatibility and the all-electric airplane

    NASA Technical Reports Server (NTRS)

    Christman, Al

    1995-01-01

    NASA is studying the feasibility of installing 'all-electric' controls in future commercial aircraft, replacing the current hydraulic and pneumatic systems. Planes utilizing such equipment should weigh less and be cheaper to maintain, but might also be susceptible to interference from undesired external electromagnetic fields. Possible sources of these extraneous signals include radio and television broadcasters, two-way communications stations, and radar installations of all kinds. One way to reduce the hazard would be to use fiber-optic cables to carry signals from the cockpit to the various points of use, a concept known as 'fly-by-light' or FBL. However, electrical circuits (PBW, or 'power-by-wire') would still be required at both ends of the cables to perform control functions, so the possibility of harmful interference would remain. Computer models for two different antennas were created in order to find the magnitude of the electric fields which would be generated in the airspace around them while in the transmit mode. The first antenna was a horizontal 'rhombic' used by the Voice of America (VOA) for long-distance short-wave broadcasting. The second antenna was a multi-element 'log-periodic dipole array' (LPDA) of a type often used for two-way radio communications. For each case, a specified amount of power was applied in the computer model, and the resulting electric field intensity was predicted at a variety of locations surrounding the antenna. This information will then be used to calculate the levels of interference which could occur inside an airplane flying in the vicinity of these radiation emitters.

  8. 2016 Data Book Shows Continued Growth of Renewable Electricity | News |

    Science.gov Websites

    NREL 2016 Data Book Shows Continued Growth of Renewable Electricity News Release: 2016 Data Book Shows Continued Growth of Renewable Electricity January 31, 2018 The 2016 Renewable Energy Data Book shows that U.S. renewable electricity grew to 18.3 percent of total installed capacity and 15.6

  9. Comparison study of the technical characteristics and financial analysis of electric battery storage systems for residential grid

    NASA Astrophysics Data System (ADS)

    Palivos, Marios; Vokas, Georgios A.; Anastasiadis, Anestis; Papageorgas, Panagiotis; Salame, Chafic

    2018-05-01

    One of the major energy issues of our days is reliable and effective energy generation and supply of electricity grids. In recent years there has been experienced a rapid development and implementation of Renewable Energy Sources (RES) worldwide. On one hand, many Gigawatts of grid-connected renewables are being installed and on the other many Megawatts of hybrid renewable systems for residential use are being installed making use of electric battery systems, in order to cover all daily energy and power needs during. New types of batteries are being developed and many companies have made great progress providing a variety of electricity storage products. The purpose of this research is firstly to highlight the necessity and also the importance of the use of energy storage systems and secondly, through detailed technical and financial simulation analysis using HOMER Pro-optimization software, to compare the technical characteristics and performance of energy storage systems by various leading companies when installed in a residential renewable energy system with a specific load and at the same time to provide the most efficient system economically. Results concerning the operation and the choice of a storage system are derived.

  10. 46 CFR 111.30-24 - Generation systems greater than 3000 kw.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Section 111.30-24 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-24 Generation systems greater than 3000 kw... Outer Continental Shelf facility, when the total installed electric power of the ship's service...

  11. 46 CFR 111.30-24 - Generation systems greater than 3000 kw.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Section 111.30-24 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-24 Generation systems greater than 3000 kw... Outer Continental Shelf facility, when the total installed electric power of the ship's service...

  12. 46 CFR 111.30-24 - Generation systems greater than 3000 kw.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Section 111.30-24 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-24 Generation systems greater than 3000 kw... Outer Continental Shelf facility, when the total installed electric power of the ship's service...

  13. 46 CFR 111.30-24 - Generation systems greater than 3000 kw.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Section 111.30-24 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-24 Generation systems greater than 3000 kw... Outer Continental Shelf facility, when the total installed electric power of the ship's service...

  14. 46 CFR 111.30-24 - Generation systems greater than 3000 kw.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Section 111.30-24 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-24 Generation systems greater than 3000 kw... Outer Continental Shelf facility, when the total installed electric power of the ship's service...

  15. 46 CFR 108.177 - Electrical equipment in classified locations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Electrical equipment in classified locations. 108.177 Section 108.177 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE... equipment in classified locations. Electrical equipment and devices installed in spaces made non-hazardous...

  16. Aircraft Electric Secondary Power

    NASA Technical Reports Server (NTRS)

    1983-01-01

    Technologies resulted to aircraft power systems and aircraft in which all secondary power is supplied electrically are discussed. A high-voltage dc power generating system for fighter aircraft, permanent magnet motors and generators for aircraft, lightweight transformers, and the installation of electric generators on turbine engines are among the topics discussed.

  17. 46 CFR 111.105-41 - Battery rooms.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Battery rooms. 111.105-41 Section 111.105-41 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-41 Battery rooms. Each electrical installation in a battery room...

  18. 46 CFR 111.01-1 - General.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false General. 111.01-1 Section 111.01-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-1 General. (a) Electric installations on vessels must ensure: (1) Maintenance of services...

  19. 46 CFR 110.30-5 - Inspection for certification.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Inspection for certification. 110.30-5 Section 110.30-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Testing and Inspection § 110.30-5 Inspection for certification. Electric installations and electric...

  20. 46 CFR 110.30-5 - Inspection for certification.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Inspection for certification. 110.30-5 Section 110.30-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Testing and Inspection § 110.30-5 Inspection for certification. Electric installations and electric...

  1. 46 CFR 111.01-1 - General.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false General. 111.01-1 Section 111.01-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-1 General. (a) Electric installations on vessels must ensure: (1) Maintenance of services...

  2. 77 FR 24833 - Airworthiness Directives; Airbus Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-26

    ... the hydraulic high pressure hose and electrical wiring of the green electrical motor pump (EMP). This... panel; doing a one-time general visual inspection for correct condition and installation of hydraulic... electrical wiring of the green EMPs, which in combination with a system failure, could cause an uncontrolled...

  3. 46 CFR 111.105-41 - Battery rooms.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Battery rooms. 111.105-41 Section 111.105-41 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-41 Battery rooms. Each electrical installation in a battery room...

  4. 46 CFR 111.105-41 - Battery rooms.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Battery rooms. 111.105-41 Section 111.105-41 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-41 Battery rooms. Each electrical installation in a battery room...

  5. 46 CFR 111.105-41 - Battery rooms.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Battery rooms. 111.105-41 Section 111.105-41 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-41 Battery rooms. Each electrical installation in a battery room...

  6. 46 CFR 111.105-41 - Battery rooms.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Battery rooms. 111.105-41 Section 111.105-41 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-41 Battery rooms. Each electrical installation in a battery room...

  7. 46 CFR 111.105-5 - System integrity.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false System integrity. 111.105-5 Section 111.105-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL... individual electrical installation in a hazardous location must comply specifically with Articles 500-505 of...

  8. Student Team Achievement Divisions: Its Effect on Electrical Motor Installation Knowledge Competence

    NASA Astrophysics Data System (ADS)

    Hanafi, Ahmad; Basuki, Ismet

    2018-04-01

    Student team achievement division (STAD) was an active learning strategy with the small group inside of the classroom members. The students would work in small heterogeneous groups (of five to six members) and help one another to comprehend the material given. To achieve the objectives of the study, this research aims to know the effect of STAD on competence of electrical motor installation. The objective of the student competence was knowledge competence. The data was collected from 30 students. the participants were the students of second class at electrical installation techniques, SMKN 1 Pungging Indonesia. The design of empirical test in this research was one shot case study. The result of knowledge test would be compared by criteria for minimum competence, which was 75. Knowledge competence was analyzed with one sample t test technique. From the analysis got average 84.93, which meant average of student competence had reached criteria for minimum competence. From that analyze, It could be concluded that STAD was effective on electrical motor installation knowledge competence. STAD could grow student motivation to learn better than other models. But, in the application of cooperative learning teacher should prepare carefully before the learning process to avoid problems that could arise during group learning such as students who were less active in the groups. The problem could be resolved by away the teachers took around to check each group. It was felt could minimize the problems.

  9. Outstanding issues for new geothermal resource assessments

    USGS Publications Warehouse

    Williams, C.F.; Reed, M.J.

    2005-01-01

    A critical question for the future energy policy of the United States is the extent to which geothermal resources can contribute to an ever-increasing demand for electricity. Electric power production from geothermal sources exceeds that from wind and solar combined, yet the installed capacity falls far short of the geothermal resource base characterized in past assessments, even though the estimated size of the resource in six assessments completed in the past 35 years varies by thousands of Megawatts-electrical (MWe). The U. S. Geological Survey (USGS) is working closely with the Department of Energy's (DOE) Geothermal Research Program and other geothermal organizations on a three-year effort to produce an updated assessment of available geothermal resources. The new assessment will introduce significant changes in the models for geothermal energy recovery factors, estimates of reservoir permeability, limits to temperatures and depths for electric power production, and include the potential impact of evolving Enhanced (or Engineered) Geothermal Systems (EGS) technology.

  10. The SunShot Initiative’s 2030 Goal: 3¢ per Kilowatt Hour for Solar Electricity

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    In 2011, when solar power comprised less than 0.1% of the U.S. electricity supply, the U.S. Department of Energy (DOE) launched the SunShot Initiative with the goal of making solar electricity cost-competitive with traditionally generated electricity by 2020 without subsidies. At the time, this meant reducing photovoltaic (PV) and concentrating solar power (CSP) prices by approximately 75% across the residential, commercial, and utility-scale sectors. For utility-scale solar, this target is a levelized cost of energy (LCOE) of 6¢ per kilowatt hour (kWh)1. Rapid progress has been made in accelerating achievement of these cost reductions, and DOE’s Solar Energy Technologies Officemore » (SETO) sees clear pathways to meeting the SunShot 2020 cost targets on schedule.2 Enabled by the cost reductions to date, solar-generated electricity has become mainstream. In 2014 and 2015, solar represented about one-third of new electrical generating capacity installed in the United States Halfway through 2016, solar was supplying 1% of U.S. electricity demand and growing with an installed capacity of 30 gigawatts.« less

  11. Natural Flow Air Cooled Photovoltaics

    NASA Astrophysics Data System (ADS)

    Tanagnostopoulos, Y.; Themelis, P.

    2010-01-01

    Our experimental study aims to investigate the improvement in the electrical performance of a photovoltaic installation on buildings through cooling of the photovoltaic panels with natural air flow. Our experimental study aims to investigate the improvement in the electrical performance of a photovoltaic installation on buildings through cooling of the photovoltaic panels with natural air flow. We performed experiments using a prototype based on three silicon photovoltaic modules placed in series to simulate a typical sloping building roof with photovoltaic installation. In this system the air flows through a channel on the rear side of PV panels. The potential for increasing the heat exchange from the photovoltaic panel to the circulating air by the addition of a thin metal sheet (TMS) in the middle of air channel or metal fins (FIN) along the air duct was examined. The operation of the device was studied with the air duct closed tightly to avoid air circulation (CLOSED) and the air duct open (REF), with the thin metal sheet (TMS) and with metal fins (FIN). In each case the experiments were performed under sunlight and the operating parameters of the experimental device determining the electrical and thermal performance of the system were observed and recorded during a whole day and for several days. We collected the data and form PV panels from the comparative diagrams of the experimental results regarding the temperature of solar cells, the electrical efficiency of the installation, the temperature of the back wall of the air duct and the temperature difference in the entrance and exit of the air duct. The comparative results from the measurements determine the improvement in electrical performance of the photovoltaic cells because of the reduction of their temperature, which is achieved by the naturally circulating air.

  12. Techniques for the Installation of Internal Fiber Optic Instrumentation on an 11-Inch Hybrid Motor Test Bed

    NASA Technical Reports Server (NTRS)

    Cornelius, Michael; Smartt, Ziba; Henrie, Vaughn; Johnson, Mont

    2003-01-01

    The recent developments in Fabry-Perot fiber optic instruments have resulted in accurate transducers with some of the physical characteristics required for use in obtaining internal data from solid rocket motors. These characteristics include small size, non-electrical excitation, and immunity to electro-magnetic interference. These transducers have not been previously utilized in this environment due to the high temperatures typically encountered. A series of tests were conducted using a 1 1-Inch Hybrid test bed to develop installation techniques that will allow the fiber optic instruments to survive and obtain data for a short period of time following the motor ignition. The installation methods developed during this test series have the potential to allow data to be acquired in the motor chamber, propellant bore, and nozzle during the ignition transient. These measurements would prove to be very useful in the characterization of current motor designs and provide insight into the requirements for further refinements. The process of developing these protective methods and the installation techniques used to apply them is summarized.

  13. High conductance surge cable

    DOEpatents

    Murray, Matthew M.; Wilfong, Dennis H.; Lomax, Ralph E.

    1998-01-01

    An electrical cable for connecting transient voltage surge suppressers to ectrical power panels. A strip of electrically conductive foil defines a longitudinal axis, with a length of an electrical conductor electrically attached to the metallic foil along the longitudinal axis. The strip of electrically conductive foil and the length of an electrical conductor are covered by an insulating material. For impedance matching purposes, triangular sections can be removed from the ends of the electrically conductive foil at the time of installation.

  14. Economic analysis of Darrieus vertical axis wind turbine systems for the generation of utility grid electrical power. Volume IV. Summary and analysis of the A. T. Kearney and Alcoa Laboratories point design economic studies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sullivan, W.N.; Nellums, R.O.

    1979-08-01

    The A.T. Kearney and Alcoa economic studies are two independent attempts to assess the installed costs of a series of six Darrieus vertical axis wind turbine designs. The designs cover a range of sizes with peak outputs from 10 to 1600 kW. All are designed to produce utility grid electrical power. Volume IV of this report summarizes, compares, and analyzes the results of these studies. The Kearney and Alcoa final reports are included in the Appendices.

  15. Economic analysis of Darrieus vertical axis wind turbine systems for the generation of utility grid electrical power. Volume IV: summary and analysis of the A. T. Kearney and Alcoa Laboratories point design economic studies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sullivan, W.N.; Nellums, R.O.

    1979-08-01

    The A. T. Kearney and Alcoa economic studies are two independent attempts to assess the installed costs of a series of six Darrieus vertical axis wind turbine designs. The designs cover a range of sizes with peak outputs from 10 to 1600 kW. All are designed to produce utility grid electrical power. Volume IV of this report summarizes, compares, and analyzes the results of these studies. The Kearney and Alcoa final reports are included in the Appendices.

  16. CFCS and electric chillers: Selection of large-capacity water chillers in the 1990s. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Niess, R.C.

    1992-03-01

    This handbook offers a single source of useful information for understanding CFC and HCFC phaseout issues and selecting large-capacity water chillers for cooling commercial buildings. It evaluates the performance of electric, absorption, and natural-gas-engine driven water chillers. An economic evaluation checklist and example are included, using the EPRI COMTECH screening tool. Peak shaving with gas chillers and load shifting with chilled water storage are examined. The handbook, written for a diverse audience, covers chiller hardware, function, performance, and typical installed costs. It provides guidelines and checklists for chiller selection, economic comparison, and operation and maintenance.

  17. CFCS and electric chillers: Selection of large-capacity water chillers in the 1990s

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Niess, R.C.

    1992-03-01

    This handbook offers a single source of useful information for understanding CFC and HCFC phaseout issues and selecting large-capacity water chillers for cooling commercial buildings. It evaluates the performance of electric, absorption, and natural-gas-engine driven water chillers. An economic evaluation checklist and example are included, using the EPRI COMTECH screening tool. Peak shaving with gas chillers and load shifting with chilled water storage are examined. The handbook, written for a diverse audience, covers chiller hardware, function, performance, and typical installed costs. It provides guidelines and checklists for chiller selection, economic comparison, and operation and maintenance.

  18. EMSCOPE - Electromagnetic Component of EarthScope Backbone and Transportable Array Experiments 2006-2008

    NASA Astrophysics Data System (ADS)

    Egbert, G.; Evans, R.; Ingate, S.; Livelybrooks, D.; Mickus, K.; Park, S.; Schultz, A.; Unsworth, M.; Wannamaker, P.

    2007-12-01

    USArray (http://www.iris.edu/USArray) in conjunction with EMSOC (Electromagnetic Studies of the Continents) (http://emsoc.ucr.edu/emsoc) is installing magnetotelluric (MT) stations as part of Earthscope. The MT component of Earthscope consists of permanent (Backbone) and transportable long period stations to record naturally occurring, time varying electric and magnetic fields to produce a regional lithospheric/asthensospheric electrical conductivity map of the United States. The recent arrival of 28 long period MT instruments allows for the final installation of the Backbone stations throughout the US and yearly transportable array studies. The Backbone MT survey consists of 7 stations spaced throughout the continental US with preliminary installation at Soap Creek, Oregon; Parkfield, California; Braden, Missouri and Socorro, New Mexico.Siting and permitting are underway or completed at stations in eastern Montana, northern Wisconsin and Virginia. These stations will be recording for at least five years to determine electrical conductivities at depths that extend into the mantle transition zone. The first transportable array experiment was performed in the summer and fall of 2006 in central and eastern Oregon (Oregon Pilot Project) using equipment loaned from EMSOC. Thirty-one long period MT stations were recorded with 14 to 21 day occupations. Preliminary 3D inverse models indicate several lithospheric electrical conductivity anomalies including a linear zone marked by low-high conductivity transition along the Klamath-Blue Mountain Lineament associated with a linear trend of gravity minima. High electrical conductivity values occur in the upper crust under the accreted terrains in the Blue Mountains region. The second transportable array experiment was performed in the summer and fall of 2007 and completes coverage of the Oregon, Washington, and western Idaho, targeting the Cascadia subduction zone, Precambrian boundaries, and sub-basalt lithologies. The 2008 transportable MT experiment will focus on the Snake River Plain and the Yellowstone Hot Spot. The disposition of future USArray magnetotelluric geotransects will be the subject of an upcoming NSF-supported planning workshop. Time series are available now from the IRIS data center (www.iris.edu/data), and magnetotelluric transfer functions will soon be available.

  19. Electrical generating unit inventory 1976-1986: Illinois, Indiana, Kentucky, Ohio, Pennsylvania and West Virginia

    NASA Astrophysics Data System (ADS)

    Jansen, S. D.

    1981-09-01

    The ORBES region consists of all of Kentucky, most of West Virginia, substantial parts of Illinois, Indiana, and Ohio, and southwestern Pennsylvania. The inventory lists installed electrical generating capacity in commercial service as of December 1, 1976, and scheduled capacity additions and removals between 1977 and 1986 in the six ORBES states (Illinois, Indiana, Kentucky, Ohio, Pennsylvania, and West Virginia). The following information is included for each electrical generating unit: unit ID code, company index, whether point or industrial ownership, plant name, whether inside or outside the ORBES region, FIPS county code, type of unit, size in megawatts, type of megawatt rating, status of unit, data of commercial operation, scheduled retirement date, primary fuel, alternate fuel, type of cooling, source of cooling water, and source of information.

  20. New method for the transformation of solar radiation energy into electric power for energy feeding of the space vehicles

    NASA Astrophysics Data System (ADS)

    Ludanov, K. I.

    The author proposes a new method for the transformation of solar radiation energy into electric power, which is alternative for photo-transformation. Ukrpatents's positive decisions are obtained for the method and for the installation for its realization. The method includes two phases: concentration of solar radiation by paraboloid mirrors with high potential heat obtaining in the helio receiver and the next heat transformation into electric power in the framework of the thermal cycle "high temperature electrolytic steam decomposition on the components (H2 and O2) + electrochemical generation by the way of the water recombination from H2 and O2 in the low temperature fuel cell". The new method gives the double superiority in comparison with the photo-transformation.

Top