Code of Federal Regulations, 2013 CFR
2013-07-01
... and electric face equipment; installation requirements. (a) Except as provided in paragraph (f) of this section, all self-propelled diesel-powered and electric face equipment, including shuttle cars... and electric face equipment; installation requirements. 75.1710-1 Section 75.1710-1 Mineral Resources...
Code of Federal Regulations, 2014 CFR
2014-07-01
... and electric face equipment; installation requirements. (a) Except as provided in paragraph (f) of this section, all self-propelled diesel-powered and electric face equipment, including shuttle cars... and electric face equipment; installation requirements. 75.1710-1 Section 75.1710-1 Mineral Resources...
Code of Federal Regulations, 2012 CFR
2012-07-01
... and electric face equipment; installation requirements. (a) Except as provided in paragraph (f) of this section, all self-propelled diesel-powered and electric face equipment, including shuttle cars... and electric face equipment; installation requirements. 75.1710-1 Section 75.1710-1 Mineral Resources...
Code of Federal Regulations, 2010 CFR
2010-07-01
... and electric face equipment; installation requirements. (a) Except as provided in paragraph (f) of this section, all self-propelled diesel-powered and electric face equipment, including shuttle cars... and electric face equipment; installation requirements. 75.1710-1 Section 75.1710-1 Mineral Resources...
Code of Federal Regulations, 2011 CFR
2011-07-01
... and electric face equipment; installation requirements. (a) Except as provided in paragraph (f) of this section, all self-propelled diesel-powered and electric face equipment, including shuttle cars... and electric face equipment; installation requirements. 75.1710-1 Section 75.1710-1 Mineral Resources...
29 CFR 1926.402 - Applicability.
Code of Federal Regulations, 2014 CFR
2014-07-01
...) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Electrical Installation Safety Requirements § 1926.402... electrical equipment and installations used to provide electric power and light at the jobsite. These... commenced. Note: If the electrical installation is made in accordance with the National Electrical Code ANSI...
46 CFR 169.673 - Installation of wiring for power and lighting circuits.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Installation of wiring for power and lighting circuits... SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical Electrical Installations Operating at Potentials of Less Than 50 Volts on Vessels of Less Than 100 Gross Tons § 169.673 Installation of wiring for...
29 CFR 1926.402 - Applicability.
Code of Federal Regulations, 2013 CFR
2013-07-01
... subpart V of this part for the construction of power distribution and transmission lines. ... electrical equipment and installations used to provide electric power and light at the jobsite. These... installations used for the generation, transmission, and distribution of electric energy, including related...
29 CFR 1926.402 - Applicability.
Code of Federal Regulations, 2012 CFR
2012-07-01
... subpart V of this part for the construction of power distribution and transmission lines. ... electrical equipment and installations used to provide electric power and light at the jobsite. These... installations used for the generation, transmission, and distribution of electric energy, including related...
29 CFR 1926.402 - Applicability.
Code of Federal Regulations, 2010 CFR
2010-07-01
... installations used for the generation, transmission, and distribution of electric energy, including related...) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Electrical Installation Safety Requirements § 1926.402... electrical equipment and installations used to provide electric power and light at the jobsite. These...
29 CFR 1926.402 - Applicability.
Code of Federal Regulations, 2011 CFR
2011-07-01
... installations used for the generation, transmission, and distribution of electric energy, including related...) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Electrical Installation Safety Requirements § 1926.402... electrical equipment and installations used to provide electric power and light at the jobsite. These...
Code of Federal Regulations, 2010 CFR
2010-01-01
... PROCEDURES AND SANCTIONS Electric Power System Permits and Reports; Applications; Administrative Procedures and Sanctions Emergency Interconnection of Electric Facilities and the Transfer of Electricity to Alleviate An Emergency Shortage of Electric Power § 205.379 Application for approval of the installation of...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Agazzone, U.; Ausiello, F.P.
1981-06-23
A power-generating installation comprises a plurality of modular power plants each comprised of an internal combustion engine connected to an electric machine. The electric machine is used to start the engine and thereafter operates as a generator supplying power to an electrical network common to all the modular plants. The installation has a control and protection system comprising a plurality of control modules each associated with a respective plant, and a central unit passing control signals to the modules to control starting and stopping of the individual power plants. Upon the detection of abnormal operation or failure of its associatedmore » power plant, each control module transmits an alarm signal back to the central unit which thereupon stops, or prevents the starting, of the corresponding power plant. Parameters monitored by each control module include generated current and inter-winding leakage current of the electric machine.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1977-01-01
The legislation on greater coal utilization before the committee includes S. 272 (requiring, to the extent practicable, electric power plants and major fuel-bearing installations to utilize fuels other than natural gas); S. 273 (requiring, to the extent practicable, new electric power plants and new major fuel-burning installations be constructed to utliize fuels other than natural gas or petroleum); and S. 977 (requiring, to the extent practicable, existing electric power plants and major fuel-burning installations to utilize fuels other than natural gas or petroleum). Statements were heard from seven senators and representatives from the following: American Electric Power Service Corp., Americanmore » Boiler Manufactures Association, National Electric Reliability Council, Virgina Electric and Power Co., Fossil Power Systems, Houston Lighting and Power Co., other electric utility industry representatives, and the Federal Energy Adminstration. Additional material from the Wall Street Journal and the Washington Post is included. (MCW)« less
78 FR 23685 - Airworthiness Directives; The Boeing Company
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-22
... installing new operational software for the electrical load management system and configuration database. The..., installing a new electrical power control panel, and installing new operational software for the electrical load management system and configuration database. Since the proposed AD was issued, we have received...
DOD fuel cell demonstration program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Holcomb, F.H.; Binder, M.J.; Taylor, W.R.
The supply of reliable, cost-effective electric power with minimal environmental impact is a constant concern of Department of Defense (DOD) installation energy personnel. Electricity purchased from the local utility is expensive and represents only about 30% of the original energy input at the generating station due to generation and distribution inefficiencies. Because of master metering and large air conditioning loads, the demand portion of the installation`s electric bill can be in excess of 50% of the total bill. While the electric utilities in the United States have a very good record of reliability, there is significant potential for improving themore » security of electrical power supplied by using on-site power generation. On-site, dispersed power generation can reduce power outages due to weather, terrorist activities, or lack of utility generating capacity. In addition, as increased emphasis is placed on global warming, acid rain, and air pollution in general, the development of clean, highly efficient power producing technologies is not only desirable, but mandatory. Since the majority of central heat plants on U.S. military installations are nearing the end of their useful life, there is an opportunity to replace outdated existing equipment with modem technologies.« less
46 CFR 31.35-1 - Electrical installations, lighting and power equipment, batteries, etc.-TB/ALL.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 1 2010-10-01 2010-10-01 false Electrical installations, lighting and power equipment, batteries, etc.-TB/ALL. 31.35-1 Section 31.35-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK... and power equipment, batteries, etc.—TB/ALL. All tank vessels are subject to the regulations contained...
46 CFR 31.35-1 - Electrical installations, lighting and power equipment, batteries, etc.-TB/ALL.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 1 2011-10-01 2011-10-01 false Electrical installations, lighting and power equipment, batteries, etc.-TB/ALL. 31.35-1 Section 31.35-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK... and power equipment, batteries, etc.—TB/ALL. All tank vessels are subject to the regulations contained...
46 CFR 31.35-1 - Electrical installations, lighting and power equipment, batteries, etc.-TB/ALL.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 1 2012-10-01 2012-10-01 false Electrical installations, lighting and power equipment, batteries, etc.-TB/ALL. 31.35-1 Section 31.35-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK... and power equipment, batteries, etc.—TB/ALL. All tank vessels are subject to the regulations contained...
46 CFR 31.35-1 - Electrical installations, lighting and power equipment, batteries, etc.-TB/ALL.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 1 2014-10-01 2014-10-01 false Electrical installations, lighting and power equipment, batteries, etc.-TB/ALL. 31.35-1 Section 31.35-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK... and power equipment, batteries, etc.—TB/ALL. All tank vessels are subject to the regulations contained...
46 CFR 31.35-1 - Electrical installations, lighting and power equipment, batteries, etc.-TB/ALL.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 1 2013-10-01 2013-10-01 false Electrical installations, lighting and power equipment, batteries, etc.-TB/ALL. 31.35-1 Section 31.35-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK... and power equipment, batteries, etc.—TB/ALL. All tank vessels are subject to the regulations contained...
Circuits Protect Against Incorrect Power Connections
NASA Technical Reports Server (NTRS)
Delombard, Richard
1992-01-01
Simple circuits prevent application of incorrectly polarized or excessive voltages. Connected temporarily or permanently at power-connecting terminals. Devised to protect electrical and electronic equipment installed in spacecraft and subjected to variety of tests in different facilities prior to installation. Basic concept of protective circuits also applied easily to many kinds of electrical and electronic equipment that must be protected against incorrect power connections.
Energy regeneration model of self-consistent field of electron beams into electric power*
NASA Astrophysics Data System (ADS)
Kazmin, B. N.; Ryzhov, D. R.; Trifanov, I. V.; Snezhko, A. A.; Savelyeva, M. V.
2016-04-01
We consider physic-mathematical models of electric processes in electron beams, conversion of beam parameters into electric power values and their transformation into users’ electric power grid (onboard spacecraft network). We perform computer simulation validating high energy efficiency of the studied processes to be applied in the electric power technology to produce the power as well as electric power plants and propulsion installation in the spacecraft.
46 CFR 111.33-5 - Installation.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...
46 CFR 111.33-5 - Installation.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...
46 CFR 111.33-5 - Installation.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...
46 CFR 111.33-5 - Installation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...
46 CFR 111.33-5 - Installation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...
46 CFR 111.95-1 - Applicability.
Code of Federal Regulations, 2012 CFR
2012-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-1 Applicability. (a) The electric installation of each electric power-operated boat winch must meet the requirements in this subpart, except that limit...
46 CFR 111.95-1 - Applicability.
Code of Federal Regulations, 2014 CFR
2014-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-1 Applicability. (a) The electric installation of each electric power-operated boat winch must meet the requirements in this subpart, except that limit...
46 CFR 111.95-1 - Applicability.
Code of Federal Regulations, 2013 CFR
2013-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-1 Applicability. (a) The electric installation of each electric power-operated boat winch must meet the requirements in this subpart, except that limit...
46 CFR 111.95-1 - Applicability.
Code of Federal Regulations, 2011 CFR
2011-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-1 Applicability. (a) The electric installation of each electric power-operated boat winch must meet the requirements in this subpart, except that limit...
46 CFR 111.95-1 - Applicability.
Code of Federal Regulations, 2010 CFR
2010-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-1 Applicability. (a) The electric installation of each electric power-operated boat winch must meet the requirements in this subpart, except that limit...
Update on the Puerto Rico Electric Power Authority`s spinning reserve battery system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Taylor, P.A.
1996-11-01
The Puerto Rico Electric Power Authority completed start-up testing and began commercial operation of a 20MW/14MWh battery energy storage facility in April 1995. The battery system was installed to provide rapid spinning reserve and frequency control for the utility`s island electrical system. This paper outlines the needs of an island utility for rapid spinning reserve; identifies Puerto Rico`s unique challenges; reviews the technical and economic analyses that justified installation of a battery energy system; describes the storage facility that was installed; and presents preliminary operating results of the facility.
Aircraft Electric Secondary Power
NASA Technical Reports Server (NTRS)
1983-01-01
Technologies resulted to aircraft power systems and aircraft in which all secondary power is supplied electrically are discussed. A high-voltage dc power generating system for fighter aircraft, permanent magnet motors and generators for aircraft, lightweight transformers, and the installation of electric generators on turbine engines are among the topics discussed.
46 CFR 169.688 - Power supply.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Power supply. 169.688 Section 169.688 Shipping COAST... Electrical Electrical Installations on Vessels of 100 Gross Tons and Over § 169.688 Power supply. (a) The... provide electric power for any vital system listed in § 169.642 of this subchapter, at least two...
46 CFR 169.688 - Power supply.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 7 2011-10-01 2011-10-01 false Power supply. 169.688 Section 169.688 Shipping COAST... Electrical Electrical Installations on Vessels of 100 Gross Tons and Over § 169.688 Power supply. (a) The... provide electric power for any vital system listed in § 169.642 of this subchapter, at least two...
46 CFR 183.392 - Radiotelephone installations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.392 Radiotelephone installations. A separate circuit, with overcurrent protection at the main distribution panel, must be provided...
46 CFR 183.392 - Radiotelephone installations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.392 Radiotelephone installations. A separate circuit, with overcurrent protection at the main distribution panel, must be provided...
46 CFR 183.392 - Radiotelephone installations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.392 Radiotelephone installations. A separate circuit, with overcurrent protection at the main distribution panel, must be provided...
47 CFR 80.864 - Emergency electric lights.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 5 2010-10-01 2010-10-01 false Emergency electric lights. 80.864 Section 80... W § 80.864 Emergency electric lights. (a) Emergency electric light(s) must be installed to...) The emergency electric light(s) must be energized from the reserve power supply, if a reserve power...
47 CFR 80.864 - Emergency electric lights.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 5 2014-10-01 2014-10-01 false Emergency electric lights. 80.864 Section 80... W § 80.864 Emergency electric lights. (a) Emergency electric light(s) must be installed to...) The emergency electric light(s) must be energized from the reserve power supply, if a reserve power...
47 CFR 80.864 - Emergency electric lights.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 5 2012-10-01 2012-10-01 false Emergency electric lights. 80.864 Section 80... W § 80.864 Emergency electric lights. (a) Emergency electric light(s) must be installed to...) The emergency electric light(s) must be energized from the reserve power supply, if a reserve power...
47 CFR 80.864 - Emergency electric lights.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 5 2011-10-01 2011-10-01 false Emergency electric lights. 80.864 Section 80... W § 80.864 Emergency electric lights. (a) Emergency electric light(s) must be installed to...) The emergency electric light(s) must be energized from the reserve power supply, if a reserve power...
47 CFR 80.864 - Emergency electric lights.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 5 2013-10-01 2013-10-01 false Emergency electric lights. 80.864 Section 80... W § 80.864 Emergency electric lights. (a) Emergency electric light(s) must be installed to...) The emergency electric light(s) must be energized from the reserve power supply, if a reserve power...
Fuel Cells Provide Reliable Power to U.S. Postal Service Facility in Anchorage, Alaska
DOE Office of Scientific and Technical Information (OSTI.GOV)
Parker, Steven
2003-01-01
Working together, the U.S. Postal Service (USPS) and Chugach Electric Association, partnering with the Department of Defense (DOD), Department of Energy (DOE), US Army Corps of Engineers Construction Engineering Research Laboratories (USA CERL), Electric Power Research Institute (EPRI), and National Rural Electric Cooperative Association (NRECA), developed and installed one of the largest fuel cell installations in the world. The one-megawatt fuel cell combined heat and power plant sits behind the Anchorage U.S. Postal Service Mail Processing and Distribution Facility. Chugach Electric owns, operates, and maintains the fuel cell power plant, which provides clean, reliable power to the USPS facility. Inmore » addition, heat recovered from the fuel cells, in the form of hot water, is used to heat the USPS Mail Processing and Distribution Facility. By taking a leadership role, the USPS will save over $800,000 in electricity and natural gas costs over the 5 1/2-year contract term with Chugach Electric.« less
46 CFR 183.310 - Power sources.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Power sources. 183.310 Section 183.310 Shipping COAST...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.310 Power sources. (a)(1) Each vessel that relies on electricity to power the following loads must be arranged so that the loads can be...
46 CFR 183.310 - Power sources.
Code of Federal Regulations, 2013 CFR
2013-10-01
...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.310 Power sources. (a)(1) Each vessel that relies on electricity to power the following loads must be arranged so that the loads can be... 46 Shipping 7 2013-10-01 2013-10-01 false Power sources. 183.310 Section 183.310 Shipping COAST...
46 CFR 183.310 - Power sources.
Code of Federal Regulations, 2012 CFR
2012-10-01
...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.310 Power sources. (a)(1) Each vessel that relies on electricity to power the following loads must be arranged so that the loads can be... 46 Shipping 7 2012-10-01 2012-10-01 false Power sources. 183.310 Section 183.310 Shipping COAST...
46 CFR 183.310 - Power sources.
Code of Federal Regulations, 2014 CFR
2014-10-01
...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.310 Power sources. (a)(1) Each vessel that relies on electricity to power the following loads must be arranged so that the loads can be... 46 Shipping 7 2014-10-01 2014-10-01 false Power sources. 183.310 Section 183.310 Shipping COAST...
46 CFR 183.310 - Power sources.
Code of Federal Regulations, 2011 CFR
2011-10-01
...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.310 Power sources. (a)(1) Each vessel that relies on electricity to power the following loads must be arranged so that the loads can be... 46 Shipping 7 2011-10-01 2011-10-01 false Power sources. 183.310 Section 183.310 Shipping COAST...
ERIC Educational Resources Information Center
Lane Community Coll., Eugene, OR.
This third-year course for electrical power station wirer apprentices is a foundation for the study of all aspects of installation and maintenance of power station equipment. It also provides a good technical background as well as the general knowledge essential to power station operator trainees. The course is intended to be equivalent to a…
Stabilization of gas turbine unit power
NASA Astrophysics Data System (ADS)
Dolotovskii, I.; Larin, E.
2017-11-01
We propose a new cycle air preparation unit which helps increasing energy power of gas turbine units (GTU) operating as a part of combined cycle gas turbine (CCGT) units of thermal power stations and energy and water supply systems of industrial enterprises as well as reducing power loss of gas turbine engines of process blowers resulting from variable ambient air temperatures. Installation of GTU power stabilizer at CCGT unit with electric and thermal power of 192 and 163 MW, respectively, has resulted in reduction of produced electrical energy production costs by 2.4% and thermal energy production costs by 1.6% while capital expenditures after installation of this equipment increased insignificantly.
Center background shows two fortyhorsepower directcurrent electric motors installed in ...
Center background shows two forty-horsepower direct-current electric motors installed in 1904 to provide power to two drive shafts for first floor machine shops. - Thomas A. Edison Laboratories, Building No. 5, Main Street & Lakeside Avenue, West Orange, Essex County, NJ
Geothermal Energy: Prospects and Problems
ERIC Educational Resources Information Center
Ritter, William W.
1973-01-01
An examination of geothermal energy as a means of increasing the United States power resources with minimal pollution problems. Developed and planned geothermal-electric power installations around the world, capacities, installation dates, etc., are reviewed. Environmental impact, problems, etc. are discussed. (LK)
Cassini's RTGs undergo mechanical and electrical verification testing in the PHSF
NASA Technical Reports Server (NTRS)
1997-01-01
Jet Propulsion Laboratory (JPL) workers carefully roll into place a platform with a second radioisotope thermoelectric generator (RTG) for installation on the Cassini spacecraft. In background at left, the first of three RTGs already has been installed on Cassini. The RTGs will provide electrical power to Cassini on its 6.7-year trip to the Saturnian system and during its four-year mission at Saturn. The power units are undergoing mechanical and electrical verification testing in the Payload Hazardous Servicing Facility. RTGs use heat from the natural decay of plutonium to generate electric power. The generators enable spacecraft to operate far from the Sun where solar power systems are not feasible. The Cassini mission is scheduled for an Oct. 6 launch aboard a Titan IVB/Centaur expendable launch vehicle. Cassini is built and managed for NASA by JPL.
46 CFR 183.354 - Battery installations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely...
46 CFR 183.354 - Battery installations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 7 2012-10-01 2012-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely...
46 CFR 183.354 - Battery installations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely...
46 CFR 183.354 - Battery installations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 7 2011-10-01 2011-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely...
46 CFR 183.354 - Battery installations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 7 2014-10-01 2014-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Shore power. 183.390 Section 183.390 Shipping COAST...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.390 Shore power. A vessel with an electrical system operating at more than 50 volts, which is provided with a means to connect to shore power...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Shore power. 120.390 Section 120.390 Shipping COAST... PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 120.390 Shore power. A vessel with an electrical system operating at more...
46 CFR 120.310 - Power sources.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Power sources. 120.310 Section 120.310 Shipping COAST... PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 120.310 Power sources. (a)(1) Each vessel that relies on electricity to...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Shore power. 120.390 Section 120.390 Shipping COAST... PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 120.390 Shore power. A vessel with an electrical system operating at more...
46 CFR 120.310 - Power sources.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Power sources. 120.310 Section 120.310 Shipping COAST... PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 120.310 Power sources. (a)(1) Each vessel that relies on electricity to...
Data feature: 1996 world nuclear electricity production
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1997-12-01
Detailed data on electricity supplied by nuclear power reactors in 1996 are provided. Figures from the International Atomic Energy Agency indicate that a total of 32 countries worldwide were operating 441 nuclear power plants with an installed capacity of 350,411 GWe, and that 36 commercial nuclear power plant units in 14 different countries with an aggregate installed capacity of 27,928 GWe were under construction. Worldwide nuclear generated electricity increased by 3.6% from 1995 to 1996, providing 17.3% of the world`s electricity production. Data for individual countries and regional totals, including generation and consumption data by source, are provided for Westernmore » Europe, Eastern Europe, the Commonwealth of Independent States, the Far East, Canada, and the United States. Other information provided includes 1996 commercial startups, decommissioning, reactor load factors, imports and exports, and gross electricity production.« less
Assessment and mitigation of power quality problems for PUSPATI TRIGA Reactor (RTP)
NASA Astrophysics Data System (ADS)
Zakaria, Mohd Fazli; Ramachandaramurthy, Vigna K.
2017-01-01
An electrical power systems are exposed to different types of power quality disturbances. Investigation and monitoring of power quality are necessary to maintain accurate operation of sensitive equipment especially for nuclear installations. This paper will discuss the power quality problems observed at the electrical sources of PUSPATI TRIGA Reactor (RTP). Assessment of power quality requires the identification of any anomalous behavior on a power system, which adversely affects the normal operation of electrical or electronic equipment. A power quality assessment involves gathering data resources; analyzing the data (with reference to power quality standards) then, if problems exist, recommendation of mitigation techniques must be considered. Field power quality data is collected by power quality recorder and analyzed with reference to power quality standards. Normally the electrical power is supplied to the RTP via two sources in order to keep a good reliability where each of them is designed to carry the full load. The assessment of power quality during reactor operation was performed for both electrical sources. There were several disturbances such as voltage harmonics and flicker that exceeded the thresholds. To reduce these disturbances, mitigation techniques have been proposed, such as to install passive harmonic filters to reduce harmonic distortion, dynamic voltage restorer (DVR) to reduce voltage disturbances and isolate all sensitive and critical loads.
Ocean thermal gradient as a generator of electricity. OTEC power plant
NASA Astrophysics Data System (ADS)
Enrique, Luna-Gomez Victor; Angel, Alatorre-Mendieta Miguel
2016-04-01
The OTEC (Ocean Thermal Energy Conversion) is a power plant that uses the thermal gradient of the sea water between the surface and a depth of about 700 meters. It works by supplying the heat to a steam machine, for evaporation, with sea water from the surface and cold, to condense the steam, with deep sea water. The energy generated by the power plant OTEC can be transferred to the electric power grid, another use is to desalinate seawater. During the twentieth century in some countries experimental power plants to produce electricity or obtaining drinking water they were installed. On the Mexico's coast itself this thermal gradient, as it is located in tropical seas it occurs, so it has possibilities of installing OTEC power plant type. In this paper one type OTEC power plant operation is represented in most of its components.
14 CFR 29.812 - Emergency lighting.
Code of Federal Regulations, 2010 CFR
2010-01-01
... lighting system, they may be recharged from the rotorcraft's main electrical power system provided the... power supply independent of the main lighting system must be installed to— (1) Illuminate each passenger... upon interruption of the rotorcraft's normal electric power. (d) Any means required to assist the...
14 CFR Appendix I to Part 25 - Installation of an Automatic Takeoff Thrust Control System (ATTCS)
Code of Federal Regulations, 2010 CFR
2010-01-01
...) This appendix specifies additional requirements for installation of an engine power control system that... crew to increase thrust or power. I25.2Definitions. (a) Automatic Takeoff Thrust Control System (ATTCS... mechanical and electrical, that sense engine failure, transmit signals, actuate fuel controls or power levers...
46 CFR 129.550 - Power for cooking and heating.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Power for cooking and heating. 129.550 Section 129.550... INSTALLATIONS Miscellaneous Electrical Systems § 129.550 Power for cooking and heating. (a) Equipment for cooking and heating must be suitable for marine use. Equipment designed and installed to comply with ABYC...
Cassini's RTGs undergo mechanical and electrical verification tests in the PHSF
NASA Technical Reports Server (NTRS)
1997-01-01
This radioisotope thermoelectric generator (RTG), at center, is ready for electrical verification testing now that it has been installed on the Cassini spacecraft in the Payload Hazardous Servicing Facility. A handling fixture, at far left, remains attached. This is the third and final RTG to be installed on Cassini for the prelaunch tests. The RTGs will provide electrical power to Cassini on its 6.7-year trip to the Saturnian system and during its four-year mission at Saturn. RTGs use heat from the natural decay of plutonium to generate electric power. The generators enable spacecraft to operate at great distances from the Sun where solar power systems are not feasible. The Cassini mission is targeted for an Oct. 6 launch aboard a Titan IVB/Centaur expendable launch vehicle.
40 CFR 51.308 - Regional haze program requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... for fossil-fuel fired power plants having a total generating capacity greater than 750 megawatts must...-eligible fossil fuel-fired steam electric plants in the State to install, operate, and maintain BART for... fossil fuel-fired steam electric plants in the State to install, operate, and maintain BART for the...
40 CFR 51.308 - Regional haze program requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... for fossil-fuel fired power plants having a total generating capacity greater than 750 megawatts must...-eligible fossil fuel-fired steam electric plants in the State to install, operate, and maintain BART for... fossil fuel-fired steam electric plants in the State to install, operate, and maintain BART for the...
Power game needs risk-free approach.
Baillie, Jonathan
2011-05-01
A detailed look at the latest regulations, legislation, and guidance governing electrical services and installations in healthcare was given by Richard Knight, director of professional estates and facilities business consultancy, CPA Solutions, at a recent IHEEM seminar, "Electrical installation guidance for healthcare premises", in London. HEJ editor Jonathan Baillie reports.
77 FR 5817 - Ocean Renewable Power Company, Tidal Energy Project, Cobscook Bay, ME
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-06
... ocean floor, used for generating electricity from tidal currents and is now providing the public the... impacts associated with installation of an underwater cable assembly to transfer electricity to a power...
Army Net Zero Prove Out. Net Zero Energy Best Practices
2014-11-18
energy which is then used to drive a heat engine to generate electrical power. Geothermal Power – These systems use thermal energy generated and...stored in the earth as a generating source for electricity. Several pilot installations are investigating this technology by conducting geothermal ...concentrate solar thermal energy which is then used to drive a heat engine to generate electrical power. • Geothermal Power - These systems use thermal energy
1997-07-18
Jet Propulsion Laboratory (JPL) workers carefully roll into place a platform with a second radioisotope thermoelectric generator (RTG) for installation on the Cassini spacecraft. In background at left, the first of three RTGs already has been installed on Cassini. The RTGs will provide electrical power to Cassini on its 6.7-year trip to the Saturnian system and during its four-year mission at Saturn. The power units are undergoing mechanical and electrical verification testing in the Payload Hazardous Servicing Facility. RTGs use heat from the natural decay of plutonium to generate electric power. The generators enable spacecraft to operate far from the Sun where solar power systems are not feasible. The Cassini mission is scheduled for an Oct. 6 launch aboard a Titan IVB/Centaur expendable launch vehicle. Cassini is built and managed for NASA by JPL
46 CFR 195.05-1 - Installation and details.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH VESSELS VESSEL... of this type include the following: Ship's Service Generating Systems. Ship's Service Power... Lighting and Power Systems. Electric Lifeboat Winch Systems. Electric Steering Gear and Steering Control...
77 FR 2926 - Airworthiness Directives; Agusta S.p.A. Helicopters
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-20
... airworthy GCU, P/N 1152550-4 or 1152550-5, to improve electrical power generation and distribution system... installing wiring to the power distribution panel, and installing a No. 1 and No. 2 GCU with P/N 1152550-4 or... Government and the States, or on the distribution of power and responsibilities among the various levels of...
46 CFR 169.688 - Power supply.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 7 2014-10-01 2014-10-01 false Power supply. 169.688 Section 169.688 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical Electrical Installations on Vessels of 100 Gross Tons and Over § 169.688 Power supply. (a) The...
46 CFR 169.688 - Power supply.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false Power supply. 169.688 Section 169.688 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical Electrical Installations on Vessels of 100 Gross Tons and Over § 169.688 Power supply. (a) The...
46 CFR 169.688 - Power supply.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 7 2012-10-01 2012-10-01 false Power supply. 169.688 Section 169.688 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical Electrical Installations on Vessels of 100 Gross Tons and Over § 169.688 Power supply. (a) The...
Snapshot of photovoltaics - February 2018
NASA Astrophysics Data System (ADS)
Jäger-Waldau, Arnulf
2018-05-01
Solar photovoltaic electricity generation is the fastest growing power generation source world-wide. The significant cost reduction of solar PV over the last decade, and the zero fuel cost volatility have increased the attractiveness. In 2017, the newly installed solar PV power of over 90 GW was more than all the world-wide cumulative installed PV capacity until the mid of 2012. China was again the main driver behind this strong growth with more than 50 GW of annual installations in 2017. Apart from the electricity sector, renewable energy sources for the generation of heat and environmental friendly synthetic-fuels for the transport sector will become more and more important in the future.
46 CFR 129.315 - Power sources for OSVs of 100 or more gross tons.
Code of Federal Regulations, 2013 CFR
2013-10-01
... VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.315 Power sources for OSVs... 46 Shipping 4 2013-10-01 2013-10-01 false Power sources for OSVs of 100 or more gross tons. 129....10 of this chapter. (b) If a generator provides electrical power for any system identified as a vital...
46 CFR 129.315 - Power sources for OSVs of 100 or more gross tons.
Code of Federal Regulations, 2011 CFR
2011-10-01
... VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.315 Power sources for OSVs... 46 Shipping 4 2011-10-01 2011-10-01 false Power sources for OSVs of 100 or more gross tons. 129....10 of this chapter. (b) If a generator provides electrical power for any system identified as a vital...
46 CFR 129.315 - Power sources for OSVs of 100 or more gross tons.
Code of Federal Regulations, 2012 CFR
2012-10-01
... VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.315 Power sources for OSVs... 46 Shipping 4 2012-10-01 2012-10-01 false Power sources for OSVs of 100 or more gross tons. 129....10 of this chapter. (b) If a generator provides electrical power for any system identified as a vital...
Cassini's RTGs undergo mechanical and electrical verification testing in the PHSF
NASA Technical Reports Server (NTRS)
1997-01-01
Jet Propulsion Laboratory (JPL) engineers examine the interface surface on the Cassini spacecraft prior to installation of the third radioisotope thermoelectric generator (RTG). The other two RTGs, at left, already are installed on Cassini. The three RTGs will be used to power Cassini on its mission to the Saturnian system. They are undergoing mechanical and electrical verification testing in the Payload Hazardous Servicing Facility. RTGs use heat from the natural decay of plutonium to generate electric power. The generators enable spacecraft to operate far from the Sun where solar power systems are not feasible. The Cassini mission is scheduled for an Oct. 6 launch aboard a Titan IVB/Centaur expendable launch vehicle. Cassini is built and managed for NASA by JPL.
1997-07-18
This radioisotope thermoelectric generator (RTG), at center, is ready for electrical verification testing now that it has been installed on the Cassini spacecraft in the Payload Hazardous Servicing Facility. A handling fixture, at far left, remains attached. This is the third and final RTG to be installed on Cassini for the prelaunch tests. The RTGs will provide electrical power to Cassini on its 6.7-year trip to the Saturnian system and during its four-year mission at Saturn. RTGs use heat from the natural decay of plutonium to generate electric power. The generators enable spacecraft to operate at great distances from the Sun where solar power systems are not feasible. The Cassini mission is targeted for an Oct. 6 launch aboard a Titan IVB/Centaur expendable launch vehicle
46 CFR 183.352 - Battery categories.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Battery categories. 183.352 Section 183.352 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.352 Battery categories. This section applies to batteries installed to meet the requirements of § 183.310 for secondary sources of power to...
46 CFR 183.352 - Battery categories.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 7 2011-10-01 2011-10-01 false Battery categories. 183.352 Section 183.352 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.352 Battery categories. This section applies to batteries installed to meet the requirements of § 183.310 for secondary sources of power to...
46 CFR 183.352 - Battery categories.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 7 2012-10-01 2012-10-01 false Battery categories. 183.352 Section 183.352 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.352 Battery categories. This section applies to batteries installed to meet the requirements of § 183.310 for secondary sources of power to...
46 CFR 183.352 - Battery categories.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false Battery categories. 183.352 Section 183.352 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.352 Battery categories. This section applies to batteries installed to meet the requirements of § 183.310 for secondary sources of power to...
46 CFR 183.352 - Battery categories.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 7 2014-10-01 2014-10-01 false Battery categories. 183.352 Section 183.352 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.352 Battery categories. This section applies to batteries installed to meet the requirements of § 183.310 for secondary sources of power to...
Electricity Submetering on the Cheap: Stick-on Electricity Meters
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lanzisera, Steven; Lorek, Michael; Pister, Kristofer
2014-08-17
We demonstrate a low-cost, 21 x 12 mm prototype Stick-on Electricity Meter (SEM) to replace traditional in-circuit-breaker-panel current and voltage sensors for building submetering. A SEM sensor is installed on the external face of a circuit breaker to generate voltage and current signals. This allows for the computation of real and apparent power as well as capturing harmonics created by non-linear loads. The prototype sensor is built using commercially available components, resulting in a production cost of under $10 per SEM. With no highvoltage install work requiring an electrician, home owners or other individuals can install the system in amore » few minutes with no safety implications. This leads to an installed system cost that is much lower than traditional submetering technology.. Measurement results from lab characterization as well as a real-world residential dwelling installation are presented, verifying the operation of our proposed SEM sensor. The SEM sensor can resolve breaker power levels below 10W, and it can be used to provide data for non-intrusive load monitoring systems at full sample rate.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nelson, James; Mileva, Ana; Johnston, Josiah
2014-01-01
This study used a state-of-the-art planning model called SWITCH for the electric power system to investigate the evolution of the power systems of California and western North America from present-day to 2050 in the context of deep decarbonization of the economy. Researchers concluded that drastic power system carbon emission reductions were feasible by 2050 under a wide range of possible futures. The average cost of power in 2050 would range between $149 to $232 per megawatt hour across scenarios, a 21 to 88 percent increase relative to a business-as-usual scenario, and a 38 to 115 percent increase relative to themore » present-day cost of power. The power system would need to undergo sweeping change to rapidly decarbonize. Between present-day and 2030 the evolution of the Western Electricity Coordinating Council power system was dominated by implementing aggressive energy efficiency measures, installing renewable energy and gas-fired generation facilities and retiring coal-fired generation. Deploying wind, solar and geothermal power in the 2040 timeframe reduced power system emissions by displacing gas-fired generation. This trend continued for wind and solar in the 2050 timeframe but was accompanied by large amounts of new storage and long-distance high-voltage transmission capacity. Electricity storage was used primarily to move solar energy from the daytime into the night to charge electric vehicles and meet demand from electrified heating. Transmission capacity over the California border increased by 40 - 220 percent by 2050, implying that transmission siting, permitting, and regional cooperation will become increasingly important. California remained a net electricity importer in all scenarios investigated. Wind and solar power were key elements in power system decarbonization in 2050 if no new nuclear capacity was built. The amount of installed gas capacity remained relatively constant between present-day and 2050, although carbon capture and sequestration was installed on some gas plants by 2050.« less
46 CFR 169.672 - Wiring for power and lighting circuits.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Wiring for power and lighting circuits. 169.672 Section... SCHOOL VESSELS Machinery and Electrical Electrical Installations Operating at Potentials of Less Than 50 Volts on Vessels of Less Than 100 Gross Tons § 169.672 Wiring for power and lighting circuits. (a...
46 CFR 169.679 - Wiring for power and lighting circuits.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Wiring for power and lighting circuits. 169.679 Section... SCHOOL VESSELS Machinery and Electrical Electrical Installations Operating at Potentials of 50 Volts Or More on Vessels of Less Than 100 Gross Tons § 169.679 Wiring for power and lighting circuits. Wiring...
46 CFR 169.679 - Wiring for power and lighting circuits.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 7 2014-10-01 2014-10-01 false Wiring for power and lighting circuits. 169.679 Section... SCHOOL VESSELS Machinery and Electrical Electrical Installations Operating at Potentials of 50 Volts Or More on Vessels of Less Than 100 Gross Tons § 169.679 Wiring for power and lighting circuits. Wiring...
46 CFR 169.679 - Wiring for power and lighting circuits.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 7 2011-10-01 2011-10-01 false Wiring for power and lighting circuits. 169.679 Section... SCHOOL VESSELS Machinery and Electrical Electrical Installations Operating at Potentials of 50 Volts Or More on Vessels of Less Than 100 Gross Tons § 169.679 Wiring for power and lighting circuits. Wiring...
46 CFR 169.679 - Wiring for power and lighting circuits.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 7 2012-10-01 2012-10-01 false Wiring for power and lighting circuits. 169.679 Section... SCHOOL VESSELS Machinery and Electrical Electrical Installations Operating at Potentials of 50 Volts Or More on Vessels of Less Than 100 Gross Tons § 169.679 Wiring for power and lighting circuits. Wiring...
46 CFR 169.679 - Wiring for power and lighting circuits.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false Wiring for power and lighting circuits. 169.679 Section... SCHOOL VESSELS Machinery and Electrical Electrical Installations Operating at Potentials of 50 Volts Or More on Vessels of Less Than 100 Gross Tons § 169.679 Wiring for power and lighting circuits. Wiring...
46 CFR 169.672 - Wiring for power and lighting circuits.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 7 2012-10-01 2012-10-01 false Wiring for power and lighting circuits. 169.672 Section... SCHOOL VESSELS Machinery and Electrical Electrical Installations Operating at Potentials of Less Than 50 Volts on Vessels of Less Than 100 Gross Tons § 169.672 Wiring for power and lighting circuits. (a...
Code of Federal Regulations, 2013 CFR
2013-01-01
... generator; and (4) Each generator must have an overvoltage control designed and installed to prevent damage...) Electric power sources, their transmission cables, and their associated control and protective devices must... operation. (4) Each electric power source control must allow the independent operation of each source. (c...
Code of Federal Regulations, 2014 CFR
2014-01-01
... generator; and (4) Each generator must have an overvoltage control designed and installed to prevent damage...) Electric power sources, their transmission cables, and their associated control and protective devices must... operation. (4) Each electric power source control must allow the independent operation of each source. (c...
Code of Federal Regulations, 2010 CFR
2010-01-01
... generator; and (4) Each generator must have an overvoltage control designed and installed to prevent damage...) Electric power sources, their transmission cables, and their associated control and protective devices must... operation. (4) Each electric power source control must allow the independent operation of each source. (c...
Code of Federal Regulations, 2011 CFR
2011-01-01
... generator; and (4) Each generator must have an overvoltage control designed and installed to prevent damage...) Electric power sources, their transmission cables, and their associated control and protective devices must... operation. (4) Each electric power source control must allow the independent operation of each source. (c...
Code of Federal Regulations, 2012 CFR
2012-01-01
... generator; and (4) Each generator must have an overvoltage control designed and installed to prevent damage...) Electric power sources, their transmission cables, and their associated control and protective devices must... operation. (4) Each electric power source control must allow the independent operation of each source. (c...
DOE Office of Scientific and Technical Information (OSTI.GOV)
A. Ilic; E. Baker; R. Hatcher
The National Spherical Torus Experiment (NSTX) has been designed and installed in the existing facilities at Princeton Plasma Physic Laboratory (PPPL). Most of the hardware, plant facilities, auxiliary sub-systems, and power systems originally used for the Tokamak Fusion Test Reactor (TFTR) have been used with suitable modifications to reflect NSTX needs. The design of the NSTX electrical power system was tailored to suit the available infrastructure and electrical equipment on site. Components were analyzed to verify their suitability for use in NSTX. The total number of circuits and the location of the NSTX device drove the major changes in themore » Power system hardware. The NSTX has eleven (11) circuits to be fed as compared to the basic three power loops for TFTR. This required changes in cabling to insure that each cable tray system has the positive and negative leg of cables in the same tray. Also additional power cabling had to be installed to the new location. The hardware had to b e modified to address the need for eleven power loops. Power converters had to be reconnected and controlled in anti-parallel mode for the Ohmic heating and two of the Poloidal Field circuits. The circuit for the Coaxial Helicity Injection (CHI) System had to be carefully developed to meet this special application. Additional Protection devices were designed and installed for the magnet coils and the CHI. The thrust was to making the changes in the most cost-effective manner without compromising technical requirements. This paper describes the changes and addition to the Electrical Power System components for the NSTX magnet systems.« less
Research on spacecraft electrical power conversion
NASA Technical Reports Server (NTRS)
Wilson, T. G.
1983-01-01
The history of spacecraft electrical power conversion in literature, research and practice is reviewed. It is noted that the design techniques, analyses and understanding which were developed make today's contribution to power computers and communication installations. New applications which require more power, improved dynamic response, greater reliability, and lower cost are outlined. The switching mode approach in electronic power conditioning is discussed. Technical aspects of the research are summarized.
Installation package maxi-therm S-101 heating module
NASA Technical Reports Server (NTRS)
1977-01-01
The installation, operation and maintenance of the Maxi-Therm S-101 Thermosypnon Heating Module is described. The Maxi-Therm S-101 is a packaged unit, complete with air filter, blower, electrical controls, and a thermosyphon liquid to air heat exchanger. It is intended for use in residential solar heating systems and can utilize off-peak electrical power.
Solar Water Heater Installation Package
NASA Technical Reports Server (NTRS)
1982-01-01
A 48-page report describes water-heating system, installation (covering collector orientation, mounting, plumbing and wiring), operating instructions and maintenance procedures. Commercial solar-powered water heater system consists of a solar collector, solar-heated-water tank, electrically heated water tank and controls. Analysis of possible hazards from pressure, electricity, toxicity, flammability, gas, hot water and steam are also included.
China power - thermal coal and clean coal technology export. Topical report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Binsheng Li
1996-12-31
China is the world`s fourth largest electric power producer, and is expected to surpass Japan within the next two years to become the third largest power producer. During the past 15 years, China`s total electricity generation more than tripled, increasing from about 300 TWh to about 1,000 TWh. Total installed generating capacity grew at an average of 8.2 percent per year, increasing from 66 to 214 GW. The share of China`s installed capacity in Asia increased from 21 to 31 percent. The Chinese government plans to continue China`s rapid growth rate in the power sector. Total installed capacity is plannedmore » to reach 300 GW by 2000, which will generate 1,400 TWh of electricity per year. China`s long-term power sector development is subject to great uncertainty. Under the middle scenario, total capacity is expected to reach 700 GW by 2015, with annual generation of 3,330 TWh. Under the low and high scenarios, total capacity will reach 527-1,005 GW by 2015. The high scenario representing possible demand. To achieve this ambitious scenario, dramatic policy changes in favor of power development are required; however, there is no evidence that such policy changes will occur at this stage. Even under the high scenario, China`s per capita annual electricity consumption would be only 3,000 kWh by 2015, less than half of the present per capita consumption for OECD countries. Under the low scenario, electricity shortages will seriously curb economic growth.« less
Installation of automatic control at experimental breeder reactor II
DOE Office of Scientific and Technical Information (OSTI.GOV)
Larson, H.A.; Booty, W.F.; Chick, D.R.
1985-08-01
The Experimental Breeder Reactor II (EBR-II) has been modified to permit automatic control capability. Necessary mechanical and electrical changes were made on a regular control rod position; motor, gears, and controller were replaced. A digital computer system was installed that has the programming capability for varied power profiles. The modifications permit transient testing at EBR-II. Experiments were run that increased power linearly as much as 4 MW/s (16% of initial power of 25 MW(thermal)/s), held power constant, and decreased power at a rate no slower than the increase rate. Thus the performance of the automatic control algorithm, the mechanical andmore » electrical control equipment, and the qualifications of the driver fuel for future power change experiments were all demonstrated.« less
Code of Federal Regulations, 2010 CFR
2010-10-01
... PASSENGERS ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 120.312 Power sources on vessels... generator sets; (b) An electrical power system that complies with the requirements of §§ 111.10-4, 111.10-5... 46 Shipping 4 2010-10-01 2010-10-01 false Power sources on vessels of more than 19.8 meters (65...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Power sources on vessels of more than 19.8 meters (65... PASSENGERS ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 120.312 Power sources on vessels... generator sets; (b) An electrical power system that complies with the requirements of §§ 111.10-4, 111.10-5...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Power sources on vessels of more than 19.8 meters (65... PASSENGERS ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 120.312 Power sources on vessels... generator sets; (b) An electrical power system that complies with the requirements of §§ 111.10-4, 111.10-5...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Power sources on vessels of more than 19.8 meters (65... PASSENGERS ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 120.312 Power sources on vessels... generator sets; (b) An electrical power system that complies with the requirements of §§ 111.10-4, 111.10-5...
Solar Power. Policy Overview and Good Practices
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cox, Sadie; Walters, Terri; Esterly, Sean
2015-05-01
As global electricity demand increases, governments are designing and implementing policies to scale up and catalyze renewable energy, which now meets 22% of global electricity demand (REN21 2014). Solar technologies are a critical component of this expanded deployment, and they have experienced unprecedented growth in recent years. As presented in Figure 1, solar prices have decreased significantly over the last decade (REN21 2014) and in 2013, new capacity installation of solar electricity from photovoltaics (PV) 1 surpassed all other renewable energy technologies worldwide—excluding hydropower—with 39 gigawatts installed that year. Concentrating solar thermal power,2 although it still represents a fairly nascentmore » market, also continues to expand as installed capacity increased by 36% in 2013 compared to 2012. In addition to meeting energy demand in an increasingly cost-effective manner, solar deployment can also support critical economic, social, and environmental development goals (Flavin and Hull Aeck, n.d.).« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Couch, R.W.; Deacon, R.J.
1973-09-30
This report defines a procedure and provides basic information needed to determine the modifications required to make electrical substations and special installations of the Bonneville Power Administration (BPA) more resistant to strong earthquake ground motion. It also provides a procedure for developing an effective plan for establishing the sequence, or priority, of providing the required modifications.
Easily installable behavioral monitoring system with electric field sensor.
Tsukamoto, Sosuke; Machida, Yuichiro; Kameda, Noriyuki; Hoshino, Hiroshi; Tamura, Toshiyo
2007-01-01
This paper describes a wireless behavioral monitoring system equipped with an electric field sensor. The sensor unit was designed to obtain information regarding the usage of home electric appliances such as the television, microwave oven, coffee maker, etc. by measuring the electric field surrounding them. It is assumed that these usage statistics could provide information regarding the indoor behavior of a subject. Since the sensor can be used by simply attaching it to an appliance and does not require any wiring for its installation, this system can be temporarily installed in any ordinary house. A simple interface for selecting the threshold value of appliances' power on/off states was introduced. The experimental results reveal that the proposed system can be installed by individuals in their residences in a short time and the usage statistics of home appliances can be gathered.
National Electrical Code in Power Engineering Course for Electrical Engineering Curriculum
ERIC Educational Resources Information Center
Azizur, Rahman M. M.
2011-01-01
In order to ensure the safety of their inhabitants and properties, the residential, industrial and business installations require complying with NEC (national electrical code) for electrical systems. Electrical design engineers and technicians rely heavily on these very important design guidelines. However, these design guidelines are not formally…
Proposed Columbia Wind Farm No. 1 : Final Environmental Impact Statement, Joint NEPA/SEPA.
DOE Office of Scientific and Technical Information (OSTI.GOV)
United States. Bonneville Power Administration; Klickitat County
1995-09-01
CARES proposes to construct and operate the 25 megawatt Columbia Wind Farm No. 1 (Project) in the Columbia Hills area of Klickitat County, Washington known as Juniper Point. Wind is not a constant resource and based on the site wind measurement data, it is estimated that the Project would generate approximately 7 average annual MWs of electricity. BPA proposes to purchase the electricity generated by the Project. CARES would execute a contractual agreement with a wind developer, to install approximately 91 wind turbines and associated facilities to generate electricity. The Project`s construction and operation would include: install concrete pier foundationsmore » for each wind turbine; install 91 model AWT-26 wind turbines using 43 m high guyed tubular towers on the pier foundations; construct a new 115/24-kv substation; construct a 149 m{sup 2} steel operations and maintenance building; install 25 pad mount transformers along the turbine access roads; install 4.0 km of underground 24 kv power collection lines to collect power from individual turbines to the end of turbine strings; install 1.2 km of underground communication and transmission lines from each turbine to a pad mount transformer; install 5.6 km of 24 kv wood pole transmission lines to deliver electricity from the pad mount transformers to the Project substation; install 3.2 km of 115 kv wood pole transmission lines to deliver electricity from the Project substation to the Public Utility District No. 1 of Klickitat County(PUD)115 kv Goldendale line; interconnect with the BPA transmission system through the Goldendale line and Goldendale substation owned by the PUD; reconstruct, upgrade, and maintain 8.0 km of existing roads; construct and maintain 6.4 km of new graveled roads along the turbine strings and to individual turbines; and install meteorological towers guyed with rebar anchors on the Project site.« less
Job Grading Standard for Electrician (High Voltage) WG-2810.
ERIC Educational Resources Information Center
Civil Service Commission, Washington, DC. Bureau of Policies and Standards.
The standard covers nonsupervisory work involved in installation, test, repair, and maintenance of electric power plant and/or overhead and underground primary electrical distribution systems. These jobs require knowledge and application of electrical principles, procedures, materials, and safety standards governing work on electrical systems…
46 CFR 169.607 - Keel cooler installations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Machinery and Electrical Internal Combustion Engine Installations § 169.607 Keel cooler installations. (a... vessel. (d) Short lengths of approved nonmetallic flexible hose may be used at machinery connections... do not depend on spring tension for their holding power; and (3) Two clamps are used on each end of...
46 CFR 169.607 - Keel cooler installations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Machinery and Electrical Internal Combustion Engine Installations § 169.607 Keel cooler installations. (a... vessel. (d) Short lengths of approved nonmetallic flexible hose may be used at machinery connections... do not depend on spring tension for their holding power; and (3) Two clamps are used on each end of...
46 CFR 169.607 - Keel cooler installations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Machinery and Electrical Internal Combustion Engine Installations § 169.607 Keel cooler installations. (a... vessel. (d) Short lengths of approved nonmetallic flexible hose may be used at machinery connections... do not depend on spring tension for their holding power; and (3) Two clamps are used on each end of...
46 CFR 169.607 - Keel cooler installations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Machinery and Electrical Internal Combustion Engine Installations § 169.607 Keel cooler installations. (a... vessel. (d) Short lengths of approved nonmetallic flexible hose may be used at machinery connections... do not depend on spring tension for their holding power; and (3) Two clamps are used on each end of...
46 CFR 169.607 - Keel cooler installations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Machinery and Electrical Internal Combustion Engine Installations § 169.607 Keel cooler installations. (a... vessel. (d) Short lengths of approved nonmetallic flexible hose may be used at machinery connections... do not depend on spring tension for their holding power; and (3) Two clamps are used on each end of...
46 CFR 183.330 - Distribution panels and switchboards.
Code of Federal Regulations, 2010 CFR
2010-10-01
... (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.330... vessel's wiring, must not have any electrically unshielded or uninsulated surfaces. (j) Switchboards and...
Turbokon scientific and production implementation company—25 years of activity
NASA Astrophysics Data System (ADS)
Favorskii, O. N.; Leont'ev, A. I.; Milman, O. O.
2016-05-01
The main results of studies performed at ZAO Turbokon NPVP in cooperation with leading Russian scientific organizations during 25 years of its activity in the field of development of unique ecologically clean electric power and heat production technologies are described. They include the development and experimental verification using prototypes and full-scale models of highly efficient air-cooled condensers for steam turbines, a high temperature gas steam turbine for stationary and transport power engineering, a nonfuel technology of electric power production using steam turbine installations with a unit power of 4-20 MW at gas-main pipelines and industrial boiler houses and heat stations. The results of efforts in the field of reducing vibroactivity of power equipment for transport installations are given. Basic directions of further research for increasing the efficiency and ecological safety of home power engineering are discussed.
Installation of solar PV systems in Sri Lanka
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fernando, M.P.T.P.
1995-10-01
The tropical country of Sri Lanka has hydroelectric power plants sufficient to provide electricity to only 40% of its 25,000 villages. The electric power needs of the average Sri Lankan rural communities are basic: three or four lights to illuminate their house and a power supply for their televisions. Solar radiation is abundant throughout the year. To take advantage of this resource, the Sarvodaya Rural Technical Services launched a Solar PV pilot demonstration project in the rural areas not served by the electric grid. The systems were being installed on an individual residence basis and funded by loans. Social andmore » cultural problems which have arisen during the course of the project have slowed its implementation. This study identifies the problems and makes recommendations to resolve the current problems and avoid new ones.« less
Environmental assessment: Kotzebue Wind Installation Project, Kotzebue, Alaska
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-05-01
The DOE is proposing to provide financial assistance to the Kotzebue Electric Association to expand its existing wind installation near Kotzebue, Alaska. Like many rural Alaska towns, Kotzebue uses diesel-powered generators to produce its electricity, the high cost of which is currently subsidized by the Alaska State government. In an effort to provide a cost effective and clean source of electricity, reduce dependence on diesel fuel, and reduce air pollutants, the DOE is proposing to fund an experimental wind installation to test commercially available wind turbines under Arctic conditions. The results would provide valuable information to other Alaska communities experiencingmore » similar dependence on diesel-powered generators. The environmental assessment for the proposed wind installation assessed impacts to biological resources, land use, electromagnetic interference, coastal zone, air quality, cultural resources, and noise. It was determined that the project does not constitute a major Federal action significantly affecting the quality of the human environment. Therefore, the preparation of an environmental impact statement is not required, and DOE has issued a Finding of No Significant Impact.« less
1997-07-18
Jet Propulsion Laboratory (JPL) engineers examine the interface surface on the Cassini spacecraft prior to installation of the third radioisotope thermoelectric generator (RTG). The other two RTGs, at left, already are installed on Cassini. The three RTGs will be used to power Cassini on its mission to the Saturnian system. They are undergoing mechanical and electrical verification testing in the Payload Hazardous Servicing Facility. RTGs use heat from the natural decay of plutonium to generate electric power. The generators enable spacecraft to operate far from the Sun where solar power systems are not feasible. The Cassini mission is scheduled for an Oct. 6 launch aboard a Titan IVB/Centaur expendable launch vehicle. Cassini is built and managed for NASA by JPL
NASA Astrophysics Data System (ADS)
Groth, H.
1982-11-01
The utilization of photovoltaic generators in measuring and signalling installations, communication systems, water pumping, and electric power plants is discussed. The advantages of solar generators over conventional power supply equipment are outlined.
46 CFR 111.95-7 - Wiring of boat winch components.
Code of Federal Regulations, 2012 CFR
2012-10-01
...-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-7 Wiring of boat winch... electric installation from all sources of potential. The switch must be in series with and on the supply...
46 CFR 111.95-7 - Wiring of boat winch components.
Code of Federal Regulations, 2013 CFR
2013-10-01
...-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-7 Wiring of boat winch... electric installation from all sources of potential. The switch must be in series with and on the supply...
46 CFR 111.95-7 - Wiring of boat winch components.
Code of Federal Regulations, 2011 CFR
2011-10-01
...-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-7 Wiring of boat winch... electric installation from all sources of potential. The switch must be in series with and on the supply...
46 CFR 111.95-7 - Wiring of boat winch components.
Code of Federal Regulations, 2014 CFR
2014-10-01
...-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-7 Wiring of boat winch... electric installation from all sources of potential. The switch must be in series with and on the supply...
You're a What? Solar Photovoltaic Installer
ERIC Educational Resources Information Center
Torpey, Elka Maria
2009-01-01
This article talks about solar photovoltaic (PV) installer and features Rebekah Hren, a solar PV installer who puts solar panels on roofs and in other sunny places to turn the sun's power into electricity. Hren enjoys promoting renewable energy, in part because it's an emerging field. In solar PV systems, solar cells--devices that convert sunlight…
NASA Technical Reports Server (NTRS)
Bifano, W. J.; Ratajczak, A. F.; Ice, W. J.
1978-01-01
A stand alone photovoltaic power system for installation in the Papago Indian village of Schuchuli is being designed and fabricated to provide electricity for village water pumping and basic domestic needs. The system will consist of a 3.5 kW (peak) photovoltaic array; controls, instrumentations, and storage batteries located in an electrical equipment building and a 120 volt dc village distribution network. The system will power a 2 HP dc electric motor.
NASA Astrophysics Data System (ADS)
Bezruchko, Konstantin; Davidov, Albert
2009-01-01
In the given article scientific and technical complex for modeling, researching and testing of rocket-space vehicles' power installations which was created in Power Source Laboratory of National Aerospace University "KhAI" is described. This scientific and technical complex gives the opportunity to replace the full-sized tests on model tests and to reduce financial and temporary inputs at modeling, researching and testing of rocket-space vehicles' power installations. Using the given complex it is possible to solve the problems of designing and researching of rocket-space vehicles' power installations efficiently, and also to provide experimental researches of physical processes and tests of solar and chemical batteries of rocket-space complexes and space vehicles. Scientific and technical complex also allows providing accelerated tests, diagnostics, life-time control and restoring of chemical accumulators for rocket-space vehicles' power supply systems.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This inventory of small industrial electric generating systems was assembled by The Aerospace Corporation to provide a data base for analyses being conducted to estimate the potential for displacement of these fossil-fueled systems by solar thermal electric systems no larger than 10 MW in rated capacity. The approximately 2100 megawatts generating capacity of systems in this category constitutes a potential market for small solar thermal and other solar electric power systems. The sources of data for this inventory were the (former) Federal Power Commission (FPC) Form 4 Industrial Ledger and Form 12-C Ledger for 1976. Table 1 alphabetically lists generatingmore » systems located at industrial plants and at Federal government installations in each of the 50 states. These systems are differentiated by type of power plant: steam turbine, diesel generator, or gas turbine. Each listing is designated as a power system rather than a power unit because the FPC Ledgers do not provide a means of determining whether more than one unit is associated with each industrial installation. Hence, the user should consider each listing to be a system capacity rating wherein the system may consist of one or more generating units with less than 10 MW/sub e/ combined rating. (WHK)« less
46 CFR 183.322 - Multiple generators.
Code of Federal Regulations, 2010 CFR
2010-10-01
...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.322 Multiple generators. When a vessel is equipped with two or more generators to supply ship's service power, the following requirements...
46 CFR 183.322 - Multiple generators.
Code of Federal Regulations, 2012 CFR
2012-10-01
...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.322 Multiple generators. When a vessel is equipped with two or more generators to supply ship's service power, the following requirements...
46 CFR 183.322 - Multiple generators.
Code of Federal Regulations, 2014 CFR
2014-10-01
...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.322 Multiple generators. When a vessel is equipped with two or more generators to supply ship's service power, the following requirements...
46 CFR 183.322 - Multiple generators.
Code of Federal Regulations, 2011 CFR
2011-10-01
...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.322 Multiple generators. When a vessel is equipped with two or more generators to supply ship's service power, the following requirements...
46 CFR 183.322 - Multiple generators.
Code of Federal Regulations, 2013 CFR
2013-10-01
...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.322 Multiple generators. When a vessel is equipped with two or more generators to supply ship's service power, the following requirements...
Consequences of Fire: The Killing Fumes
... Electric Vehicles Fire Fighter Safety and Response for Solar Power Systems Fire Fighting Tactics Under Wind Driven ... Protection Devices Development of Fire Mitigations Solutions for PV Systems Installed on Building Roofs - Phase 1 Electric/ ...
46 CFR 169.681 - Disconnect switches and devices.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Machinery and Electrical Electrical Installations Operating at Potentials of 50 Volts Or More on Vessels of... controllers. (e) Disconnect means must be provided to open all conductors of generator and shore power cables...
Analysis of Axial Turbine Pico-Hydro Electrical Power Plant in North Sulawesi Indonesia
NASA Astrophysics Data System (ADS)
Sangari, F. J.; Rompas, P. T. D.
2018-02-01
This study presents analysis of pico-hydro electrical power plant in North Sulawesi, Indonesia. The objective of this study is to get a design of axial turbine pico-hydro electrical power plant. The method used the study of literature, survey the construction site of the power plant and the characteristics of the location being a place of study, analysis of hydropower ability and analyzing costs of power plant. The result showed that the design of axial turbine pico-hydro installation is connected to a generator to produce electrical energy maximum can be used for household needs in villages. This analyze will be propose to local government of Minahasa, North Sulawesi, Indonesia.
1997-07-18
Jet Propulsion Laboratory (JPL) workers prepare the installation cart (atop the platform) for removal of a radioisotope thermoelectric generator (RTG) from the adjacent Cassini spacecraft. This is the second of three RTGs being removed from Cassini after undergoing mechanical and electrical verification tests in the Payload Hazardous Servicing Facility. The third RTG to be removed is in background at left. The three RTGs will then be temporarily stored before being re-installed for flight. The RTGs will provide electrical power to Cassini on its 6.7-year trip to the Saturnian system and during its four-year mission at Saturn. RTGs use heat from the natural decay of plutonium to generate electric power. The generators enable spacecraft to operate far from the Sun where solar power systems are not feasible. The Cassini mission is scheduled for an Oct. 6 launch aboard a Titan IVB/Centaur expendable launch vehicle. Cassini is built and managed for NASA by JPL
NASA Astrophysics Data System (ADS)
Dobra, R.; Pasculescu, D.; Risteiu, M.; Buica, G.; Jevremović, V.
2017-06-01
This paper describe some possibilities to minimize voltages switching-off risks from the mining power networks, in case of insulated resistance faults by using a predictive diagnose method. The cables from the neutral insulated power networks (underground mining) are designed to provide a flexible electrical connection between portable or mobile equipment and a point of supply, including main feeder cable for continuous miners, pump cable, and power supply cable. An electronic protection for insulated resistance of mining power cables can be made using this predictive strategy. The main role of electronic relays for insulation resistance degradation of the electrical power cables, from neutral insulated power networks, is to provide a permanent measurement of the insulated resistance between phases and ground, in order to switch-off voltage when the resistance value is below a standard value. The automat system of protection is able to signalize the failure and the human operator will be early informed about the switch-off power and will have time to take proper measures to fix the failure. This logic for fast and automat switch-off voltage without aprioristic announcement is suitable for the electrical installations, realizing so a protection against fires and explosion. It is presented an algorithm and an anticipative relay for insulated resistance control from three-phase low voltage installations with insulated neutral connection.
46 CFR 129.510 - Lifeboat winches.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Lifeboat winches. 129.510 Section 129.510 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Miscellaneous Electrical Systems § 129.510 Lifeboat winches. Each lifeboat winch operated by electric power must...
46 CFR 129.510 - Lifeboat winches.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Lifeboat winches. 129.510 Section 129.510 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Miscellaneous Electrical Systems § 129.510 Lifeboat winches. Each lifeboat winch operated by electric power must...
The General Electric MOD-1 wind turbine generator program
NASA Technical Reports Server (NTRS)
Poor, R. H.; Hobbs, R. B.
1979-01-01
The design, fabrication, installation and checkout of MOD-1, a megawatt class wind turbine generator which generates utility grade electrical power, is described. A MOD-1/MOD-1A tradeoff study is discussed.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having an Automatically Connected Storage Battery as the Sole Emergency Power Source § 112.30-1 General. This subpart contains requirements applicable to emergency power installations having...
Code of Federal Regulations, 2012 CFR
2012-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having an Automatically Connected Storage Battery as the Sole Emergency Power Source § 112.30-1 General. This subpart contains requirements applicable to emergency power installations having...
Code of Federal Regulations, 2011 CFR
2011-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having an Automatically Connected Storage Battery as the Sole Emergency Power Source § 112.30-1 General. This subpart contains requirements applicable to emergency power installations having...
Code of Federal Regulations, 2010 CFR
2010-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having an Automatically Connected Storage Battery as the Sole Emergency Power Source § 112.30-1 General. This subpart contains requirements applicable to emergency power installations having...
Code of Federal Regulations, 2013 CFR
2013-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having an Automatically Connected Storage Battery as the Sole Emergency Power Source § 112.30-1 General. This subpart contains requirements applicable to emergency power installations having...
Power system interface and umbilical system study
NASA Technical Reports Server (NTRS)
1980-01-01
System requirements and basic design criteria were defined for berthing or docking a payload to the 25 kW power module which will provide electrical power and attitude control, cooling, data transfer, and communication services to free-flying and Orbiter sortie payloads. The selected umbilical system concept consists of four assemblies and command and display equipment to be installed at the Orbiter payload specialist station: (1) a movable platen assembly which is attached to the power system with EVA operable devices; (2) a slave platen assembly which is attached to the payload with EVA operable devices; (3) a fixed secondary platen permanently installed in the power system; and (4) a fixed secondary platen permanently installed on the payload. Operating modes and sequences are described.
Stroili, M; Pavan, E C; Gorela, M; Kenda, F
2015-08-01
The Technical Services and the Medical Administration of the Hospitals of Trieste have been working for years to ensure the optimal functioning of the Medicine, Surgery, Diagnostics and Research services offered to the Patients and to the University in an 800-bed hospital complex, transforming and innovating the buildings and support installations. We have dedicated special attention to the technologies necessary to guarantee the continuity of the power supply to the electromedical devices, increasingly numerous in highly specialized hospitals. We report our electricity consumption and the power of the generator sets and the UPS and our opinion that their power must be related to the overall consumption of the Hospital, with a reserve margin.
The introduction of space technology power systems into developing countries
NASA Technical Reports Server (NTRS)
Roberts, Allen F.; Ratajczak, Anthony F.
1989-01-01
Between 1978 and 1984, NASA-Lewis was responsible for the design, fabrication, installation and operational support of 57 photovoltaic power systems in 27 countries. These systems were installed in locations not served by a central power system and ranged in size from 40 W for powering street lights to 29 kW for providing power to a complete village. Several of the system projects had socio/economic studies components that provided for an assessment of how the introduction of both electricity and a novel high technology power system affected the users and their society.
On the possibility of generation of cold and additional electric energy at thermal power stations
NASA Astrophysics Data System (ADS)
Klimenko, A. V.; Agababov, V. S.; Borisova, P. N.
2017-06-01
A layout of a cogeneration plant for centralized supply of the users with electricity and cold (ECCG plant) is presented. The basic components of the plant are an expander-generator unit (EGU) and a vapor-compression thermotransformer (VCTT). At the natural-gas-pressure-reducing stations, viz., gas-distribution stations and gas-control units, the plant is connected in parallel to a throttler and replaces the latter completely or partially. The plant operates using only the energy of the natural gas flow without burning the gas; therefore, it can be classified as a fuelless installation. The authors compare the thermodynamic efficiencies of a centralized cold supply system based on the proposed plant integrated into the thermal power station scheme and a decentralized cold supply system in which the cold is generated by electrically driven vapor-compression thermotransformers installed on the user's premises. To perform comparative analysis, the exergy efficiency was taken as the criterion since in one of the systems under investigation the electricity and the cold are generated, which are energies of different kinds. It is shown that the thermodynamic efficiency of the power supply using the proposed plant proves to be higher within the entire range of the parameters under consideration. The article presents the results of investigating the impact of the gas heating temperature upstream from the expander on the electric power of the plant, its total cooling capacity, and the cooling capacities of the heat exchangers installed downstream from the EGU and the evaporator of the VCTT. The results of calculations are discussed that show that the cold generated at the gas-control unit of a powerful thermal power station can be used for the centralized supply of the cold to the ventilation and conditioning systems of both the buildings of the power station and the neighboring dwelling houses, schools, and public facilities during the summer season.
46 CFR 111.30-24 - Generation systems greater than 3000 kw.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Section 111.30-24 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-24 Generation systems greater than 3000 kw... Outer Continental Shelf facility, when the total installed electric power of the ship's service...
46 CFR 111.30-24 - Generation systems greater than 3000 kw.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 111.30-24 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-24 Generation systems greater than 3000 kw... Outer Continental Shelf facility, when the total installed electric power of the ship's service...
46 CFR 111.30-24 - Generation systems greater than 3000 kw.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Section 111.30-24 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-24 Generation systems greater than 3000 kw... Outer Continental Shelf facility, when the total installed electric power of the ship's service...
46 CFR 111.30-24 - Generation systems greater than 3000 kw.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Section 111.30-24 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-24 Generation systems greater than 3000 kw... Outer Continental Shelf facility, when the total installed electric power of the ship's service...
46 CFR 111.30-24 - Generation systems greater than 3000 kw.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Section 111.30-24 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-24 Generation systems greater than 3000 kw... Outer Continental Shelf facility, when the total installed electric power of the ship's service...
Code of Federal Regulations, 2011 CFR
2011-10-01
...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.390 Shore power. A vessel with an... at the switchboard or main distribution panel for the shore power connection; and (d) The circuit... 46 Shipping 7 2011-10-01 2011-10-01 false Shore power. 183.390 Section 183.390 Shipping COAST...
Code of Federal Regulations, 2013 CFR
2013-10-01
...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.390 Shore power. A vessel with an... at the switchboard or main distribution panel for the shore power connection; and (d) The circuit... 46 Shipping 7 2013-10-01 2013-10-01 false Shore power. 183.390 Section 183.390 Shipping COAST...
Code of Federal Regulations, 2014 CFR
2014-10-01
... at a convenient location; (b) A cable connecting the shore power connection box or receptacle to the... 46 Shipping 7 2014-10-01 2014-10-01 false Shore power. 183.390 Section 183.390 Shipping COAST...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.390 Shore power. A vessel with an...
Code of Federal Regulations, 2012 CFR
2012-10-01
... at a convenient location; (b) A cable connecting the shore power connection box or receptacle to the... 46 Shipping 7 2012-10-01 2012-10-01 false Shore power. 183.390 Section 183.390 Shipping COAST...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.390 Shore power. A vessel with an...
Nuclear power generation and fuel cycle report 1997
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1997-09-01
Nuclear power is an important source of electric energy and the amount of nuclear-generated electricity continued to grow as the performance of nuclear power plants improved. In 1996, nuclear power plants supplied 23 percent of the electricity production for countries with nuclear units, and 17 percent of the total electricity generated worldwide. However, the likelihood of nuclear power assuming a much larger role or even retaining its current share of electricity generation production is uncertain. The industry faces a complex set of issues including economic competitiveness, social acceptance, and the handling of nuclear waste, all of which contribute to themore » uncertain future of nuclear power. Nevertheless, for some countries the installed nuclear generating capacity is projected to continue to grow. Insufficient indigenous energy resources and concerns over energy independence make nuclear electric generation a viable option, especially for the countries of the Far East.« less
Improving flexibility characteristics of 200 MW unit
NASA Astrophysics Data System (ADS)
Taler, Jan; Trojan, Marcin; Taler, Dawid; Dzierwa, Piotr; Kaczmarski, Karol
2017-03-01
Calculations were performed of the thermal system of a power plant with installed water pressure tanks. The maximum rise in the block electric power resulting from the shut-off of low-pressure regenerative heaters is determined. At that time, the boiler is fed with hot water from water pressure tanks acting as heat accumulators. Accumulation of hot water in water tanks is also proposed in the periods of the power unit small load. In order to lower the plant electric power in the off-peak night hours, water heated in low-pressure regenerative heaters and feed water tank to the nominal temperature is directed to water pressure tanks. The water accumulated during the night is used to feed the boiler during the period of peak demand for electricity. Drops in the power block electric power were determined for different capacities of the tanks and periods when they are charged. A financial and economic profitability analysis (of costs and benefits) is made of the use of tanks for a 200 MW power unit. Operating in the automatic system of frequency and power control, the tanks may also be used to ensure a sudden increase in the electric power of the unit. The results of the performed calculations and analyses indicate that installation of water pressure tanks is well justified. The investment is profitable. Water pressure tanks may not only be used to reduce the power unit power during the off-peak night hours and raise it in the periods of peak demand, but also to increase the power capacity fast at any time. They may also be used to fill the boiler evaporator with hot water during the power unit start-up from the cold state.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS... Generator as the Sole Emergency Power Source § 112.35-1 General. This subpart contains requirements applicable to emergency power installations having a manually controlled storage battery, diesel engine, or...
Code of Federal Regulations, 2012 CFR
2012-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS... Generator as the Sole Emergency Power Source § 112.35-1 General. This subpart contains requirements applicable to emergency power installations having a manually controlled storage battery, diesel engine, or...
Code of Federal Regulations, 2013 CFR
2013-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS... Generator as the Sole Emergency Power Source § 112.35-1 General. This subpart contains requirements applicable to emergency power installations having a manually controlled storage battery, diesel engine, or...
21. POWER ROOM INTERIOR, DETAIL OF CATERPILLAR DIESEL ENGINE DIRECTLY ...
21. POWER ROOM INTERIOR, DETAIL OF CATERPILLAR DIESEL ENGINE DIRECTLY CONNECTED TO GENERAL ELECTRIC 15 KW DC GENERATOR (ON LEFT), 110 VOLTS, 136 AMPS, 1200 RPM. INSTALLED 1942. - Death Valley Ranch, Power House, Death Valley Junction, Inyo County, CA
Code of Federal Regulations, 2013 CFR
2013-10-01
... cable connecting the shore power connection box or receptacle to the switchboard or main distribution... 46 Shipping 4 2013-10-01 2013-10-01 false Shore power. 120.390 Section 120.390 Shipping COAST... PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS ELECTRICAL INSTALLATION Power Sources...
Design and installation of 3 photovoltaic village power systems in Tunisia
DOE Office of Scientific and Technical Information (OSTI.GOV)
Darkazalli, G.; Rangaraian, A.; Scudder, L.
1982-09-01
A joint program sponsored by the United States Agency for International Development (U.S.A.I.D.) and the government of Tunisia was initiated to study the feasibility of using photovoltaics to supply electricity to remote villages in Tunisia. U.S.A.I.D. selected the NASA Lewis Research Center to implement the installation of three photovoltaic systems in the Tunisian village of Hammam Biadha Sud. In a competitive procurement, NASA selected a team proposed by the Solar Power Corporation, TriSolar Corporation, Esso Standard Tunisie and Development Sciences, Inc. to design and install the systems and train the villagers in the use of photovoltaics. The Tunisian Government counterpartmore » to NASA, is STEG, the Tunisian electrical generation authority. An overview of the systems designs is presented in this paper.« less
1997-05-27
Jet Propulsion Laboratory (JPL) technicians finish mounting a thermal model of a radioisotope thermoelectric generator (RTG) on the installation cart which will be used to install the RTG in the Cassini spacecraft at Level 14 of Space Launch Complex 40, Cape Canaveral Air Station. The technicians use the thermal model to practice installation procedures. The three actual RTGs which will provide electrical power to Cassini on its 6.7-mile trip to the Saturnian system, and during its four-year mission at Saturn, are being tested and monitored in the Radioisotope Thermoelectric Generator Storage Building in KSC's Industrial Area. The RTGs use heat from the natural decay of plutonium to generate electric power. RTGs enable spacecraft to operate far from the Sun where solar power systems are not feasible. The RTGs on Cassini are of the same design as those flying on the already deployed Galileo and Ulysses spacecraft. The Cassini mission is targeted for an October 6 launch aboard a Titan IVB/Centaur expendable launch vehicle. Cassini is built and managed for NASA by JPL
Improving Energy Security for Air Force Installations
NASA Astrophysics Data System (ADS)
Schill, David
Like civilian infrastructure, Air Force installations are dependent on electrical energy for daily operations. Energy shortages translate to decreased productivity, higher costs, and increased health risks. But for the United States military, energy shortages have the potential to become national security risks. Over ninety-five percent of the electrical energy used by the Air Force is supplied by the domestic grid, which is susceptible to shortages and disruptions. Many Air Force operations require a continuous source of energy, and while the Air Force has historically established redundant supplies of electrical energy, these back-ups are designed for short-term outages and may not provide sufficient supply for a longer, sustained power outage. Furthermore, it is the goal of the Department of Defense to produce or procure 25 percent of its facility energy from renewable sources by fiscal year 2025. In a government budget environment where decision makers are required to provide more capability with less money, it is becoming increasingly important for informed decisions regarding which energy supply options bear the most benefit for an installation. The analysis begins by exploring the field of energy supply options available to an Air Force installation. The supply options are assessed according to their ability to provide continuous and reliable energy, their applicability to unique requirements of Air Force installations, and their costs. Various methods of calculating energy usage by an installation are also addressed. The next step of this research develops a methodology and tool which assesses how an installation responds to various power outage scenarios. Lastly, various energy supply options are applied to the tool, and the results are reported in terms of cost and loss of installation capability. This approach will allow installation commanders and energy managers the ability to evaluate the cost and effectiveness of various energy investment options.
The SunShot Initiative’s 2030 Goal: 3¢ per Kilowatt Hour for Solar Electricity
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
In 2011, when solar power comprised less than 0.1% of the U.S. electricity supply, the U.S. Department of Energy (DOE) launched the SunShot Initiative with the goal of making solar electricity cost-competitive with traditionally generated electricity by 2020 without subsidies. At the time, this meant reducing photovoltaic (PV) and concentrating solar power (CSP) prices by approximately 75% across the residential, commercial, and utility-scale sectors. For utility-scale solar, this target is a levelized cost of energy (LCOE) of 6¢ per kilowatt hour (kWh)1. Rapid progress has been made in accelerating achievement of these cost reductions, and DOE’s Solar Energy Technologies Officemore » (SETO) sees clear pathways to meeting the SunShot 2020 cost targets on schedule.2 Enabled by the cost reductions to date, solar-generated electricity has become mainstream. In 2014 and 2015, solar represented about one-third of new electrical generating capacity installed in the United States Halfway through 2016, solar was supplying 1% of U.S. electricity demand and growing with an installed capacity of 30 gigawatts.« less
Code of Federal Regulations, 2013 CFR
2013-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having a Temporary and a Final Emergency Power Source § 112.20-1 General. This subpart contains requirements applicable to emergency power installations having both a temporary and a final...
Code of Federal Regulations, 2014 CFR
2014-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having a Temporary and a Final Emergency Power Source § 112.20-1 General. This subpart contains requirements applicable to emergency power installations having both a temporary and a final...
Code of Federal Regulations, 2012 CFR
2012-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having a Temporary and a Final Emergency Power Source § 112.20-1 General. This subpart contains requirements applicable to emergency power installations having both a temporary and a final...
Code of Federal Regulations, 2010 CFR
2010-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having a Temporary and a Final Emergency Power Source § 112.20-1 General. This subpart contains requirements applicable to emergency power installations having both a temporary and a final...
Code of Federal Regulations, 2011 CFR
2011-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having a Temporary and a Final Emergency Power Source § 112.20-1 General. This subpart contains requirements applicable to emergency power installations having both a temporary and a final...
Feasibility study of a 270V dc flat cable aircraft electrical power distributed system
NASA Astrophysics Data System (ADS)
Musga, M. J.; Rinehart, R. J.
1982-01-01
This report documents the efforts of a one man-year feasibility study to evaluate the usage of flat conductors in place of conventional round wires for a 270 volt direct current aircraft power distribution system. This study consisted of designing electrically equivalent power distribution harnesses in flat conductor configurations for a currently operational military aircraft. Harness designs were established for installation in aircraft airframes which are: (1) All metal, or (2) All composite, or (3) a mixture of both. Flat cables have greater surface areas for heat transfer allowing higher current densities and therefore lighter weight conductors, than with round wires. Flat cables are less susceptible to electromagnetic effects. However, these positive factors are partially offset by installation and maintenance difficulties. This study concludes that the extent of these difficulties can be adequately limited with appropriate modification to present installation and maintenance practices. A comparative analysis of the flat and the round conductor power distribution harnesses was made for weight, cost, maintenance and reliability. The knowledge gained from the design and comparative analysis phases was used to generate design criteria for flat power cable harnesses and to identify and prioritize flat cable harness components and associated production tooling which require development.
30 CFR 57.12048 - Communication conductors on power poles.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Communication conductors on power poles. 57... MINES Electricity Surface and Underground § 57.12048 Communication conductors on power poles. Telegraph, telephone, or signal wires shall not be installed on the same crossarm with power conductors. When carried...
30 CFR 57.12048 - Communication conductors on power poles.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Communication conductors on power poles. 57... MINES Electricity Surface and Underground § 57.12048 Communication conductors on power poles. Telegraph, telephone, or signal wires shall not be installed on the same crossarm with power conductors. When carried...
30 CFR 56.12048 - Communication conductors on power poles.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Communication conductors on power poles. 56... Electricity § 56.12048 Communication conductors on power poles. Telegraph, telephone, or signal wires shall not be installed on the same crossarm with power conductors. When carried on poles supporting...
30 CFR 56.12048 - Communication conductors on power poles.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Communication conductors on power poles. 56... Electricity § 56.12048 Communication conductors on power poles. Telegraph, telephone, or signal wires shall not be installed on the same crossarm with power conductors. When carried on poles supporting...
46 CFR 129.315 - Power sources for OSVs.
Code of Federal Regulations, 2014 CFR
2014-10-01
... INSTALLATIONS Power Sources and Distribution Systems § 129.315 Power sources for OSVs. (a) The requirements of... 46 Shipping 4 2014-10-01 2014-10-01 false Power sources for OSVs. 129.315 Section 129.315 Shipping... subpart 111.10 of this chapter. (b) If a generator provides electrical power for any system identified as...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Maget, H.J.R.
1979-06-15
This program consists of a design study and component development for an experimental 50-kWp photovoltaic concentrator system to supply power to the San Ramon substation of the Pacific Gas and Electric Company. The photovoltaic system is optimized to produce peaking power to relieve the air conditioning load on the PG and E system during summer afternoons; and would therefore displace oil-fired power generation capacity. No electrical storage is required. The experiment would use GaAs concentrator cells with point-focus fresnel lenses operating at 400X, in independent tracking arrays of 440 cells each, generating 3.8 kWp. Fourteen arrays, each 9 feet bymore » 33 feet, are connected electrically in series to generate the 50 kWp. The high conversion efficiency possible with GaAs concentrator cells results in a projected annual average system efficiency (AC electric power output to sunlight input) of better than 15%. The capability of GaAs cells for high temperature operation made possible the design of a total energy option, whereby thermal power from selected arrays could be used to heat and cool the control center for the installation. System design and analysis, fabrication and installation, environmental assessment, and cost projections are described in detail. (WHK)« less
NASA Astrophysics Data System (ADS)
Mohammed, Touseef Ahmed Faisal
Since 2000, renewable electricity installations in the United States (excluding hydropower) have more than tripled. Renewable electricity has grown at a compounded annual average of nearly 14% per year from 2000-2010. Wind, Concentrated Solar Power (CSP) and solar Photo Voltaic (PV) are the fastest growing renewable energy sectors. In 2010 in the U.S., solar PV grew over 71% and CSP grew by 18% from the previous year. Globally renewable electricity installations have more than quadrupled from 2000-2010. Solar PV generation grew by a factor of more than 28 between 2000 and 2010. The amount of CSP and solar PV installations are increasing on the distribution grid. These PV installations transmit electrical current from the load centers to the generating stations. But the transmission and distribution grid have been designed for uni-directional flow of electrical energy from generating stations to load centers. This causes imbalances in voltage and switchgear of the electrical circuitry. With the continuous rise in PV installations, analysis of voltage profile and penetration levels remain an active area of research. Standard distributed photovoltaic (PV) generators represented in simulation studies do not reflect the exact location and variability properties such as distance between interconnection points to substations, voltage regulators, solar irradiance and other environmental factors. Quasi-Static simulations assist in peak load planning hour and day ahead as it gives a time sequence analysis to help in generation allocation. Simulation models can be daily, hourly or yearly depending on duty cycle and dynamics of the system. High penetration of PV into the power grid changes the voltage profile and power flow dynamically in the distribution circuits due to the inherent variability of PV. There are a number of modeling and simulations tools available for the study of such high penetration PV scenarios. This thesis will specifically utilize OpenDSS, a open source Distribution System Simulator developed by Electric Power Research Institute, to simulate grid voltage profile with a large scale PV system under quasi-static time series considering variations of PV output in seconds, minutes, and the average daily load variations. A 13 bus IEEE distribution feeder model is utilized with distributed residential and commercial scale PV at different buses for simulation studies. Time series simulations are discussed for various modes of operation considering dynamic PV penetration at different time periods in a day. In addition, this thesis demonstrates simulations taking into account the presence of moving cloud for solar forecasting studies.
Assessing the Future of Distributed Wind: Opportunities for Behind-the-Meter Projects
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lantz, Eric; Sigrin, Benjamin; Gleason, Michael
2016-11-01
Wind power is one of the fastest growing sources of new electricity generation in the United States. Cumulative installed capacity was more than 74,000 megawatts (MW) at year-end 2015 and wind power supplied 4.7% of total 2015 U.S. electricity generation. Despite the growth of the wind power industry, the distributed wind market has remained limited. Cumulative installations of distributed wind through 2015 totaled 934 MW. This first-of-a-kind exploratory analysis characterizes the future opportunity for behind-the-meter distributed wind, serving primarily rural or suburban homes, farms, and manufacturing facilities. This work focuses only on the grid-connected, behind-the-meter subset of the broader distributedmore » wind market. We estimate this segment to be approximately half of the 934 MW of total installed distributed wind capacity at year-end 2015. Potential from other distributed wind market segments including systems installed in front of the meter (e.g., community wind) and in remote, off-grid locations is not assessed in this analysis and therefore, would be additive to results presented here. These other distributed wind market segments are not considered in this initial effort because of their relatively unique economic and market attributes.« less
NASA Astrophysics Data System (ADS)
Yang, Junnan; Li, Xiaoyuan; Peng, Wei; Wagner, Fabian; Mauzerall, Denise L.
2018-06-01
Solar photovoltaic (PV) electricity generation can greatly reduce both air pollutant and greenhouse gas emissions compared to fossil fuel electricity generation. The Chinese government plans to greatly scale up solar PV installation between now and 2030. However, different PV development pathways will influence the range of air quality and climate benefits. Benefits depend on how much electricity generated from PV is integrated into power grids and the type of power plant displaced. Using a coal-intensive power sector projection as the base case, we estimate the climate, air quality, and related human health benefits of various 2030 PV deployment scenarios. We use the 2030 government goal of 400 GW installed capacity but vary the location of PV installation and the extent of inter-provincial PV electricity transmission. We find that deploying distributed PV in the east with inter-provincial transmission maximizes potential CO2 reductions and air quality-related health benefits (4.2% and 1.2% decrease in national total CO2 emissions and air pollution-related premature deaths compared to the base case, respectively). Deployment in the east with inter-provincial transmission results in the largest benefits because it maximizes displacement of the dirtiest coal-fired power plants and minimizes PV curtailment, which is more likely to occur without inter-provincial transmission. We further find that the maximum co-benefits achieved with deploying PV in the east and enabling inter-provincial transmission are robust under various maximum PV penetration levels in both provincial and regional grids. We find large potential benefits of policies that encourage distributed PV deployment and facilitate inter-provincial PV electricity transmission in China.
29 CFR 1910.254 - Arc welding and cutting.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 80 volts. (c) Installation of arc welding equipment—(1) General. Installation including power supply... mechanically strong and electrically adequate for the required current. (3) Supply connections and conductors...-carrying capacity of the supply conductors shall be not less than the rated primary current of the welding...
7 CFR 3560.53 - Eligible use of funds.
Code of Federal Regulations, 2011 CFR
2011-01-01
... of the site immediately prior to purchase. (e) Develop and install necessary systems. Funds may be used to install streets, a water supply, sewage disposal, heating and cooling systems, electric, gas, solar, or other power sources for lighting and other features necessary for the housing. If such...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false General. 112.55-1 Section 112.55-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Storage Battery Installation § 112.55-1 General. Each storage battery installation must meet Subpart 111...
7 CFR 3560.53 - Eligible use of funds.
Code of Federal Regulations, 2014 CFR
2014-01-01
... of the site immediately prior to purchase. (e) Develop and install necessary systems. Funds may be used to install streets, a water supply, sewage disposal, heating and cooling systems, electric, gas, solar, or other power sources for lighting and other features necessary for the housing. If such...
7 CFR 3560.53 - Eligible use of funds.
Code of Federal Regulations, 2013 CFR
2013-01-01
... of the site immediately prior to purchase. (e) Develop and install necessary systems. Funds may be used to install streets, a water supply, sewage disposal, heating and cooling systems, electric, gas, solar, or other power sources for lighting and other features necessary for the housing. If such...
7 CFR 3560.53 - Eligible use of funds.
Code of Federal Regulations, 2012 CFR
2012-01-01
... of the site immediately prior to purchase. (e) Develop and install necessary systems. Funds may be used to install streets, a water supply, sewage disposal, heating and cooling systems, electric, gas, solar, or other power sources for lighting and other features necessary for the housing. If such...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false General. 112.55-1 Section 112.55-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Storage Battery Installation § 112.55-1 General. Each storage battery installation must meet Subpart 111...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false General. 112.55-1 Section 112.55-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Storage Battery Installation § 112.55-1 General. Each storage battery installation must meet Subpart 111...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false General. 112.55-1 Section 112.55-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Storage Battery Installation § 112.55-1 General. Each storage battery installation must meet Subpart 111...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false General. 112.55-1 Section 112.55-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Storage Battery Installation § 112.55-1 General. Each storage battery installation must meet Subpart 111...
Use of wind turbines to generate electricity for highway buildings.
DOT National Transportation Integrated Search
1983-01-01
To determine the feasibility of using wind turbines to generate electrical power, measurements of wind speeds were made for a period of one year at three installations of the Virginia Department of Highways and Transportation. Unfortunately, the wind...
10 CFR 205.352 - Information to be reported.
Code of Federal Regulations, 2014 CFR
2014-01-01
... DEPARTMENT OF ENERGY OIL ADMINISTRATIVE PROCEDURES AND SANCTIONS Electric Power System Permits and Reports; Applications; Administrative Procedures and Sanctions Report of Major Electric Utility System Emergencies § 205... involved; and whether any known critical services such as hospitals, military installations, pumping...
10 CFR 205.352 - Information to be reported.
Code of Federal Regulations, 2013 CFR
2013-01-01
... DEPARTMENT OF ENERGY OIL ADMINISTRATIVE PROCEDURES AND SANCTIONS Electric Power System Permits and Reports; Applications; Administrative Procedures and Sanctions Report of Major Electric Utility System Emergencies § 205... involved; and whether any known critical services such as hospitals, military installations, pumping...
10 CFR 205.352 - Information to be reported.
Code of Federal Regulations, 2012 CFR
2012-01-01
... DEPARTMENT OF ENERGY OIL ADMINISTRATIVE PROCEDURES AND SANCTIONS Electric Power System Permits and Reports; Applications; Administrative Procedures and Sanctions Report of Major Electric Utility System Emergencies § 205... involved; and whether any known critical services such as hospitals, military installations, pumping...
10 CFR 205.352 - Information to be reported.
Code of Federal Regulations, 2011 CFR
2011-01-01
... DEPARTMENT OF ENERGY OIL ADMINISTRATIVE PROCEDURES AND SANCTIONS Electric Power System Permits and Reports; Applications; Administrative Procedures and Sanctions Report of Major Electric Utility System Emergencies § 205... involved; and whether any known critical services such as hospitals, military installations, pumping...
NREL + SolarCity: Maximizing Solar Power on Electrical Grids Video Text
Electrical Grids video. RYAN HANLEY: The growth of distributed energy resources is becoming real and tangible . BRYAN HANNEGAN: Solar technologies, particularly those distributed, rooftop, PV solar technologies, add Hawaiian Electric Company was concerned about as far as installing distributed energy resources on their
DOE Office of Scientific and Technical Information (OSTI.GOV)
Colella, Whitney G.; Pilli, Siva Prasad
2015-06-01
The United States (U.S.) Department of Energy (DOE)’s Pacific Northwest National Laboratory (PNNL) is spearheading a program with industry to deploy and independently monitor five kilowatt-electric (kWe) combined heat and power (CHP) fuel cell systems (FCSs) in light commercial buildings. This publication discusses results from PNNL’s research efforts to independently evaluate manufacturer-stated engineering, economic, and environmental performance of these CHP FCSs at installation sites. The analysis was done by developing parameters for economic comparison of CHP installations. Key thermodynamic terms are first defined, followed by an economic analysis using both a standard accounting approach and a management accounting approach. Keymore » economic and environmental performance parameters are evaluated, including (1) the average per unit cost of the CHP FCSs per unit of power, (2) the average per unit cost of the CHP FCSs per unit of energy, (3) the change in greenhouse gas (GHG) and air pollution emissions with a switch from conventional power plants and furnaces to CHP FCSs; (4) the change in GHG mitigation costs from the switch; and (5) the change in human health costs related to air pollution. From the power perspective, the average per unit cost per unit of electrical power is estimated to span a range from $15–19,000/ kilowatt-electric (kWe) (depending on site-specific changes in installation, fuel, and other costs), while the average per unit cost of electrical and heat recovery power varies between $7,000 and $9,000/kW. From the energy perspective, the average per unit cost per unit of electrical energy ranges from $0.38 to $0.46/kilowatt-hour-electric (kWhe), while the average per unit cost per unit of electrical and heat recovery energy varies from $0.18 to $0.23/kWh. These values are calculated from engineering and economic performance data provided by the manufacturer (not independently measured data). The GHG emissions were estimated to decrease by one-third by shifting from a conventional energy system to a CHP FCS system. The GHG mitigation costs were also proportional to the changes in the GHG gas emissions. Human health costs were estimated to decrease significantly with a switch from a conventional system to a CHP FCS system.« less
Thermoelectric-Driven Autonomous Sensors for a Biomass Power Plant
NASA Astrophysics Data System (ADS)
Rodríguez, A.; Astrain, D.; Martínez, A.; Gubía, E.; Sorbet, F. J.
2013-07-01
This work presents the design and development of a thermoelectric generator intended to harness waste heat in a biomass power plant, and generate electric power to operate sensors and the required electronics for wireless communication. The first objective of the work is to design the optimum thermoelectric generator to harness heat from a hot surface, and generate electric power to operate a flowmeter and a wireless transmitter. The process is conducted by using a computational model, presented in previous papers, to determine the final design that meets the requirements of electric power consumption and number of transmissions per minute. Finally, the thermoelectric generator is simulated to evaluate its performance. The final device transmits information every 5 s. Moreover, it is completely autonomous and can be easily installed, since no electric wires are required.
Ultrawide-Bandgap Semiconductors: Research Opportunities and Challenges
2017-02-03
particularly for power electronics applications in hybrid and electric vehicles, power supplies, and photovoltaic ( PV ) inverters. Ultrawide-Bandgap...the one hand, Ga2O3-based optoelectronic devices such as solar -blind DUV photodetectors are expected to be useful for a variety of applications (e.g...system, and which are core components in aircraft, spacecraft, solar photovoltaic installations, electric vehicles, and military systems such as all
Environmental impact of coal industry and thermal power plants in India.
Mishra, U C
2004-01-01
Coal is the only natural resource and fossil fuel available in abundance in India. Consequently, it is used widely as a thermal energy source and also as fuel for thermal power plants producing electricity. India has about 90,000 MW installed capacity for electricity generation, of which more than 70% is produced by coal-based thermal power plants. Hydro-electricity contributes about 25%, and the remaining is mostly from nuclear power plants (NPPs). The problems associated with the use of coal are low calorific value and very high ash content. The ash content is as high as 55-60%, with an average value of about 35-40%. Further, most of the coal is located in the eastern parts of the country and requires transportation over long distances, mostly by trains, which run on diesel. About 70% oil is imported and is a big drain on India's hard currency. In the foreseeable future, there is no other option likely to be available, as the nuclear power programme envisages installing 20,000 MWe by the year 2020, when it will still be around 5% of the installed capacity. Hence, attempts are being made to reduce the adverse environmental and ecological impact of coal-fired power plants. The installed electricity generating capacity has to increase very rapidly (at present around 8-10% per annum), as India has one of the lowest per capita electricity consumptions. Therefore, the problems for the future are formidable from ecological, radio-ecological and pollution viewpoints. A similar situation exists in many developing countries of the region, including the People's Republic of China, where coal is used extensively. The paper highlights some of these problems with the data generated in the author's laboratory and gives a brief description of the solutions being attempted. The extent of global warming in this century will be determined by how developing countries like India manage their energy generation plans. Some of the recommendations have been implemented for new plants, and the situation in the new plants is much better. A few coal washeries have also been established. It will be quite some time before the steps to improve the environmental releases are implemented in older plants and several coal mines due to resource constraints.
PROTOTYPE EICHER FISH SCREEN AND EVALUATION FACILITY, INSTALLED IN 1990 ...
PROTOTYPE EICHER FISH SCREEN AND EVALUATION FACILITY, INSTALLED IN 1990 ON #1 PENSTOCK. PROJECT SPONSORED BY THE ELECTRICAL POWER RESEARCH INSTITUTE TO TRANSFER FISH DOWNSTREAM PAST THE TURBINES. PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Elwha Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA
46 CFR 183.324 - Dual voltage generators.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Dual voltage generators. 183.324 Section 183.324... TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.324 Dual voltage generators. (a) A dual voltage generator installed on a vessel shall be of the grounded type, where: (1) The...
Murray, M.M.; Wilfong, D.H.; Lomax, R.E.
1998-12-08
An electrical cable for connecting transient voltage surge suppressors to electrical power panels. A strip of electrically conductive foil defines a longitudinal axis, with a length of an electrical conductor electrically attached to the metallic foil along the longitudinal axis. The strip of electrically conductive foil and the length of an electrical conductor are covered by an insulating material. For impedance matching purposes, triangular sections can be removed from the ends of the electrically conductive foil at the time of installation. 6 figs.
Cassini's RTGs undergo mechanical and electrical verification tests in the PHSF
NASA Technical Reports Server (NTRS)
1997-01-01
Workers in the Payload Hazardous Servicing Facility remove the storage collar from a radioisotope thermoelectric generator (RTG) in preparation for installation on the Cassini spacecraft. Cassini will be outfitted with three RTGs. The power units are undergoing mechanical and electrical verification tests in the PHSF. The RTGs will provide electrical power to Cassini on its 6.7-year trip to the Saturnian system and during its four-year mission at Saturn. RTGs use heat from the natural decay of plutonium to generate electric power. The generators enable spacecraft to operate at great distances from the Sun where solar power systems are not feasible. The Cassini mission is targeted for an Oct. 6 launch aboard a Titan IVB/Centaur expendable launch vehicle.
30 CFR 75.1002 - Installation of electric equipment and conductors; permissibility.
Code of Federal Regulations, 2012 CFR
2012-07-01
... faces must be— (1) Shielded high-voltage cables supplying power to permissible longwall equipment; (2... intrinsically safe circuits; and (4) Cables and conductors supplying power to low- and medium-voltage permissible equipment. (5) Shielded high-voltage cables supplying power to permissible continuous mining...
30 CFR 75.1002 - Installation of electric equipment and conductors; permissibility.
Code of Federal Regulations, 2013 CFR
2013-07-01
... faces must be— (1) Shielded high-voltage cables supplying power to permissible longwall equipment; (2... intrinsically safe circuits; and (4) Cables and conductors supplying power to low- and medium-voltage permissible equipment. (5) Shielded high-voltage cables supplying power to permissible continuous mining...
30 CFR 75.1002 - Installation of electric equipment and conductors; permissibility.
Code of Federal Regulations, 2014 CFR
2014-07-01
... faces must be— (1) Shielded high-voltage cables supplying power to permissible longwall equipment; (2... intrinsically safe circuits; and (4) Cables and conductors supplying power to low- and medium-voltage permissible equipment. (5) Shielded high-voltage cables supplying power to permissible continuous mining...
14 CFR 23.1309 - Equipment, systems, and installations.
Code of Federal Regulations, 2010 CFR
2010-01-01
... compliance with this section with regard to the electrical power system and to equipment design and... the system must be able to supply the following power loads in probable operating combinations and for probable durations: (1) Loads connected to the power distribution system with the system functioning...
PERFORMANCE OF SOLAR HOT WATER COLLECTORS FOR ELECTRICITY PRODUCTION AND CLIMATE CONTROL
We will systematically evaluate commercially available solar thermal collectors and thermal storage systems for use in residential scale co-generative heat and electrical power systems. Currently, reliable data is unavailable over the range of conditions and installations thes...
14 CFR 25.1707 - System separation: EWIS.
Code of Federal Regulations, 2013 CFR
2013-01-01
... installed to ensure adequate physical separation and electrical isolation so that damage to circuits... ensure adequate physical separation and electrical isolation so that a fault in any one airplane power... minimize potential for abrasion/chafing, vibration damage, and other types of mechanical damage. ...
14 CFR 25.1707 - System separation: EWIS.
Code of Federal Regulations, 2014 CFR
2014-01-01
... installed to ensure adequate physical separation and electrical isolation so that damage to circuits... ensure adequate physical separation and electrical isolation so that a fault in any one airplane power... minimize potential for abrasion/chafing, vibration damage, and other types of mechanical damage. ...
14 CFR 25.1707 - System separation: EWIS.
Code of Federal Regulations, 2010 CFR
2010-01-01
... installed to ensure adequate physical separation and electrical isolation so that damage to circuits... ensure adequate physical separation and electrical isolation so that a fault in any one airplane power... minimize potential for abrasion/chafing, vibration damage, and other types of mechanical damage. ...
14 CFR 25.1707 - System separation: EWIS.
Code of Federal Regulations, 2012 CFR
2012-01-01
... installed to ensure adequate physical separation and electrical isolation so that damage to circuits... ensure adequate physical separation and electrical isolation so that a fault in any one airplane power... minimize potential for abrasion/chafing, vibration damage, and other types of mechanical damage. ...
14 CFR 25.1707 - System separation: EWIS.
Code of Federal Regulations, 2011 CFR
2011-01-01
... installed to ensure adequate physical separation and electrical isolation so that damage to circuits... ensure adequate physical separation and electrical isolation so that a fault in any one airplane power... minimize potential for abrasion/chafing, vibration damage, and other types of mechanical damage. ...
Small-scale Geothermal Power Plants Using Hot Spring Water
NASA Astrophysics Data System (ADS)
Tosha, T.; Osato, K.; Kiuchi, T.; Miida, H.; Okumura, T.; Nakashima, H.
2013-12-01
The installed capacity of the geothermal power plants has been summed up to be about 515MW in Japan. However, the electricity generated by the geothermal resources only contributes to 0.2% of the whole electricity supply. After the catastrophic earthquake and tsunami devastated the Pacific coast of north-eastern Japan on Friday, March 11, 2011, the Japanese government is encouraging the increase of the renewable energy supply including the geothermal. It needs, however, more than 10 years to construct the geothermal power plant with more than 10MW capacity since the commencement of the development. Adding the problem of the long lead time, high temperature fluid is mainly observed in the national parks and the high quality of the geothermal resources is limited. On the other hand hot springs are often found. The utilisation of the low temperature hot water becomes worthy of notice. The low temperature hot water is traditionally used for bathing and there are many hot springs in Japan. Some of the springs have enough temperature and enthalpy to turn the geothermal turbine but a new technology of the binary power generation makes the lower temp fluid to generate electricity. Large power generators with the binary technology are already installed in many geothermal fields in the world. In the recent days small-scale geothermal binary generators with several tens to hundreds kW capacity are developed, which are originally used by the waste heat energy in an iron factory and so on. The newly developed binary unit is compact suitable for the installation in a Japanese inn but there are the restrictions for the temperature of the hot water and the working fluid. The binary power unit using alternatives for chlorofluorocarbon as the working fluid is relatively free from the restriction. KOBELCO, a company of the Kobe Steel Group, designed and developed the binary power unit with an alternative for chlorofluorocarbon. The unit has a 70 MW class electric generator. Three units have been installed in Obama Hot Spring area, Nagasaki Prefecture, where about 15,000 tonnes of hot water are produced in a day and more than 35% of the hot water flow directly to the sea. Another demonstration experiments are also conducted in several hot spring areas. In this study we will review several examples to utilise low temperature hot springs in Japan. Binary Power Unit at Obama (Fujino, 2013)
Installed Base Registration of Decentralised Solar Panels with Applications in Crisis Management
NASA Astrophysics Data System (ADS)
Aarsen, R.; Janssen, M.; Ramkisoen, M.; Biljecki, F.; Quak, W.; Verbree, E.
2015-08-01
In case of a calamity in the Netherlands - e.g. a dike breach - parts of the nationwide electric network can fall out. In these occasions it would be useful if decentralised energy sources of the Smart Grid would contribute to balance out the fluctuations of the energy network. Decentralised energy sources include: solar energy, wind energy, combined heat and power, and biogas. In this manner, parts of the built environment - e.g. hospitals - that are in need of a continuous power flow, could be secured of this power. When a calamity happens, information about the Smart Grid is necessary to control the crisis and to ensure a shared view on the energy networks for both the crisis managers and network operators. The current situation of publishing, storing and sharing data of solar energy has been shown a lack of reliability about the current number, physical location, and capacity of installed decentralised photovoltaic (PV) panels in the Netherlands. This study focuses on decentralised solar energy in the form of electricity via PV panels in the Netherlands and addresses this challenge by proposing a new, reliable and up-to-date database. The study reveals the requirements for a registration of the installed base of PV panels in the Netherlands. This new database should serve as a replenishment for the current national voluntary registration, called Production Installation Register of Energy Data Services Netherland (EDSN-PIR), of installed decentralised PV panel installations in the Smart Grid, and provide important information in case of a calamity.
Review of stand-alone photovoltaic application projects sponsored by US DOE and US AID
NASA Technical Reports Server (NTRS)
Bifano, W. J.
1981-01-01
Experience with dc photovoltaic systems (without backup power) and ranging in output from 23 to 3,500 peak watts, in a wide range of environmental conditions and with a wide range of insolation, is described. Cooperation of NASA with other government agencies resulted in the installation of an air pollution monitor in New Jersey, a seismic sensor in Hawaii, power for lookout towers in national forests in California, an electric power system for a Papago Indian village in Arizona, and a power system for a grain mill and water pump in Tangaye, Upper Volta. Significant operational results are discussed and system reliability is assessed for the 20 experimental systems installed since 1976. Additional systems to be installed overseas are highlighted, and economic factors are considered.
Murray, Matthew M.; Wilfong, Dennis H.; Lomax, Ralph E.
1998-01-01
An electrical cable for connecting transient voltage surge suppressers to ectrical power panels. A strip of electrically conductive foil defines a longitudinal axis, with a length of an electrical conductor electrically attached to the metallic foil along the longitudinal axis. The strip of electrically conductive foil and the length of an electrical conductor are covered by an insulating material. For impedance matching purposes, triangular sections can be removed from the ends of the electrically conductive foil at the time of installation.
Workers install the RTGs on the Cassini spacecraft at LC 40, CCAS
NASA Technical Reports Server (NTRS)
1997-01-01
At Launch Complex 40 on Cape Canaveral Air Station, workers are installing three Radioisotope Thermoelectric Generators (RTGs) on the Cassini spacecraft. RTGs are lightweight, compact spacecraft electrical power systems that have flown successfully on 23 previous U.S. missions over the past 37 years. These generators produce power by converting heat into electrical energy; the heat is provided by the natural radioactive decay of plutonium-238 dioxide, a non-weapons-grade material. RTGs enable spacecraft to operate at significant distances from the Sun where solar power systems would not be feasible. Cassini will travel two billion miles to reach Saturn and another 1.1 billion miles while in orbit around Saturn. Cassini is undergoing final preparations for liftoff on a Titan IVB/Centaur launch vehicle, with the launch window opening at 4:55 a.m. EDT, Oct. 13.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-04
... and 2 AGENCY: Nuclear Regulatory Commission. ACTION: Issuance of an environmental assessment and finding of no significant impact. FOR FURTHER INFORMATION CONTACT: Jennie Rankin, Project Manager... reactors, Surry Power Station Units 1 and 2, located in Surry County, Virginia. II. Environmental...
The 40-kw field test power plant modification and development, phase 2
NASA Technical Reports Server (NTRS)
1980-01-01
Progression on the design and development of a 40 KW fuel cell system for on-site installation for providing both thermal and electrical power is reported. Development of the steam reformer fuel processor, power section, inverter, control system, and thermal management and water treatment systems is described.
5. 7 MW Tornados for Dunn Paper mill power CHP plant
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jeffs, E.
The first commercial installation in the United States of Ruston's high efficiency Tornado gas turbine is now fully operational at the Dunn Paper Company's Port Huron, Michigan paper mill where they make special light weight papers for packaging and business forms. It's a cogeneration installation powered by three Tornados and two waste heat recovery boilers which provide the mill with all of its electricity and process steam requirements - at high overall thermal efficiency.
Promotion of renewable energy in some MENA region countries
NASA Astrophysics Data System (ADS)
Abdeladim, K.; Bouchakour, S.; Arab, A. Hadj; Ould Amrouche, S.; Yassaa, N.
2018-05-01
In recent years Middle East and North African (MENA) countries, are showing efforts about the integration of renewable electricity into their power markets. Indeed, installations were already achieved and renewable energy programs were launched. The Algerian program remains one of the most ambitious with its installation capacity up to 22GW of power generating to be installed by 2030. More than 60 % of the total capacity is planned to be solar photovoltaic (PV). Like Algeria, Morocco has integrated development project with a target to develop by 2020 a 2000 MW capacity of electricity production from solar energy. The Tunisian government has launched its first phase of the renewable power generation program, with an objective to install 1,000 MW of renewable power capacity over the 2017-2020 periods, where 650 MW of the total capacity is planned to be solar and 350 MW wind. One of the leading Arab country in wind energy, these recent years is Egypt, with its more than 700 megawatt of operational power generation plants and has launched significant projects development in solar energy. Regarding Jordan, the government has taken different steps in this field of energy with a Strategy plan 2007-2020, by implementing a large scale of projects on renewable energy sources, with an objective to cover 10% of the country’s energy supply, from renewable sources by the year 2020. Concerning Lebanon, the country is looking to attain an integration of 12 % by 2020.
ERIC Educational Resources Information Center
D'Alessandro, Bill
1979-01-01
Describes the world's only solar electric village power system, a photovoltaic conversion installation in a remote Papago Indian Reservation village. Notes comparative costs, electric output, and potential applications of the system, a prototype for remote rural communities and developing nations. Notes outstanding questions and key issues in…
46 CFR 183.520 - Lifeboat winches.
Code of Federal Regulations, 2010 CFR
2010-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Miscellaneous Systems and Requirements § 183.520 Lifeboat winches. Each electric power operated lifeboat winch must meet, 111.95 in subchapter J and § 160.015 in subchapter Q of this...
Cryo-delivery Systems for the Co-transmission of Chemical and Electrical Power
NASA Astrophysics Data System (ADS)
Grant, Paul M.
2006-04-01
We present a novel concept for the simultaneous transport of chemical power in the form of natural gas or hydrogen in a cryogenic state along with the simultaneous transmission of electrical power over via superconductivity. This concept could impact future efforts to tap and deliver methane from distant geographic resources over conventional pipelines with part of the chemical potential energy converted directly to electricity at the wellhead and the remaining gas cooled cryogenically to increase volumetric density and provide the necessary support of a superconducting cable housed within the same packaging. As the fossil reserve becomes depleted, nuclear power plants would be constructed at the former remote wellhead sites to co-generate electricity and cryocooled hydrogen, the latter replacing natural gas and also serving to operate the already installed superconducting electrical service line.
Evaluation of Electric Power Procurement Strategies by Stochastic Dynamic Programming
NASA Astrophysics Data System (ADS)
Saisho, Yuichi; Hayashi, Taketo; Fujii, Yasumasa; Yamaji, Kenji
In deregulated electricity markets, the role of a distribution company is to purchase electricity from the wholesale electricity market at randomly fluctuating prices and to provide it to its customers at a given fixed price. Therefore the company has to take risk stemming from the uncertainties of electricity prices and/or demand fluctuation instead of the customers. The way to avoid the risk is to make a bilateral contact with generating companies or install its own power generation facility. This entails the necessity to develop a certain method to make an optimal strategy for electric power procurement. In such a circumstance, this research has the purpose for proposing a mathematical method based on stochastic dynamic programming and additionally considering the characteristics of the start-up cost of electric power generation facility to evaluate strategies of combination of the bilateral contract and power auto-generation with its own facility for procuring electric power in deregulated electricity market. In the beginning we proposed two approaches to solve the stochastic dynamic programming, and they are a Monte Carlo simulation method and a finite difference method to derive the solution of a partial differential equation of the total procurement cost of electric power. Finally we discussed the influences of the price uncertainty on optimal strategies of power procurement.
A peaking-regulation-balance-based method for wind & PV power integrated accommodation
NASA Astrophysics Data System (ADS)
Zhang, Jinfang; Li, Nan; Liu, Jun
2018-02-01
Rapid development of China’s new energy in current and future should be focused on cooperation of wind and PV power. Based on the analysis of system peaking balance, combined with the statistical features of wind and PV power output characteristics, a method of comprehensive integrated accommodation analysis of wind and PV power is put forward. By the electric power balance during night peaking load period in typical day, wind power installed capacity is determined firstly; then PV power installed capacity could be figured out by midday peak load hours, which effectively solves the problem of uncertainty when traditional method hard determines the combination of the wind and solar power simultaneously. The simulation results have validated the effectiveness of the proposed method.
2003-03-04
Aerovironment technicians carefully line up attachments as a fuel cell electrical system is installed on the Helios Prototype solar powered flying wing. The fuel cell system will power the aircraft at night during NASA-sponsored long-endurance demonstration flight in the summer of 2003.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lawrence, R.G.; Finney, D.; Davidson, D.F.
1988-07-01
The construction, testing, and installation of a 6500 r/min 15 000-hp adjustable-speed electric drive for a centrifugal gas compressor is presented. A power electronic converter is applied to control the speed of a 5-kV motor. The motor is directly coupled to a 6500 r/min compressor and replaced a steam turbine. Dual converters are used in a twelve-pulse arrangement at both the utility and the motor. The motor is of solid rotor construction, with dual 30/sup 0/ displaced stator windings. Finite-element analysis is used to optimize the motor designs for use with a variable-frequency static converter. Full-power tests are completed whichmore » confirm theoretical predictions on losses, performance, and operation. The electrical drive takes up considerably less space and is much more efficient than the steam turbine it replaced.« less
Effect of wind speed on performance of a solar-pv array
USDA-ARS?s Scientific Manuscript database
Thousands of solar photovoltaic (PV) arrays have been installed over the past few years, but the effect of wind speed on the predicted performance of PV arrays is not usually considered by installers. An increase in wind speed will cool the PV array, and the electrical power of the PV modules will ...
1997-07-19
Workers in the Payload Hazardous Servicing Facility remove the storage collar from a radioisotope thermoelectric generator (RTG) in preparation for installation on the Cassini spacecraft. Cassini will be outfitted with three RTGs. The power units are undergoing mechanical and electrical verification tests in the PHSF. The RTGs will provide electrical power to Cassini on its 6.7-year trip to the Saturnian system and during its four-year mission at Saturn. RTGs use heat from the natural decay of plutonium to generate electric power. The generators enable spacecraft to operate at great distances from the Sun where solar power systems are not feasible. The Cassini mission is targeted for an Oct. 6 launch aboard a Titan IVB/Centaur expendable launch vehicle
89. Photocopied August 1978. POWER HOUSE, GENERATOR ROOM, VIEW LOOKING ...
89. Photocopied August 1978. POWER HOUSE, GENERATOR ROOM, VIEW LOOKING EAST FROM ABOUT THE CENTER, FEBRUARY 26, 1918, AFTER MICHIGAN NORTHERN HAD BROUGHT THE GENERATOR INSTALLATION UP TO FULL CAPACITY. THE NARROW PANEL WESTINGHOUSE SWITCHBOARD INSTALLED IN 1916-17 IS AT THE UPPER RIGHT. THE NEW GENERAL ELECTRIC GENERATORS ARE BELOW THE GALLERY. NOTE THE D.C. EXCITER UNIT ON EXTENDED SHAFT ON THE UNIT IN THE FOREGROUND. A SIMILAR TYPE OF INSTALLATION WAS FOUND AT PENSTOCKS 45 THROUGH 48 AND 62 THROUGH 73. WHAT SEEM TO BE EXTENDED SHAFT UNITS IN THE BACKGROUND ARE MERELY THE OLD STANLEY ALTERNATORS BEFORE THEY HAD BEEN REMOVED FROM THE GENERATOR ROOM. (878) - Michigan Lake Superior Power Company, Portage Street, Sault Ste. Marie, Chippewa County, MI
Electricity market liberalization under the power of customer value evaluation and service model
NASA Astrophysics Data System (ADS)
Bai, Hong Kun; Wang, Jiang Bo; Song, Da Wei
2018-06-01
After the power reform No. 9 was released in March 2015, the state officially released the Opinions on the Implementation of the Reform on the Power Sales Side. From this document, we can see that the openness of sales of social capital to the electricity business, the sales side of the market competition through multiple ways to train the main competitors, the result is more users have the right to choose, sales service quality and user energy levels will significantly improve. With the gradual promotion of the electricity sales market, the national electricity sales companies have been established one after another. In addition to power grid outside the power generation companies, energy-saving service companies and distributed power companies may become the main selling power, while industrial parks, commercial complex, large residential area, industrial and commercial users, large industrial users in the new electricity demand appearing The new changes, some power customers have also self-built distributed power supply, installation of energy storage devices or equipment to participate in the transformation of the electricity market. The main body of the electricity sales market has gradually evolved from the traditional electricity generation main body to the multi-unit main body and emerged new value points. Therefore, the electricity sales companies need to establish a power customer value evaluation method and service mode to adapt to the new electricity reform, Provide supportive decision support.
A Model of Small Capacity Power Plant in Tateli Village, North Sulawesi
NASA Astrophysics Data System (ADS)
Sangari, F. J.; Rompas, P. T. D.
2017-03-01
The electricity supply in North Sulawesi is still very limited so ubiquitous electric current outage. It makes rural communities have problems in life because most uses electrical energy. One of the solutions is a model of power plants to supply electricity in Tateli village, Minahasa, North Sulawesi, Indonesia. The objective of this research is to get the model that generate electrical energy for household needs through power plant that using a model of Picohydro with cross flow turbine in Tateli village. The method used the study of literature, survey the construction site of the power plant and the characteristics of the location being a place of research, analysis of hydropower ability and analyzing costs of power plant. The result showed that the design model of cross flow turbines used in pico-hydro hydropower installations is connected to a generator to produce electrical energy maximum of 3.29 kW for household needs. This analyze will be propose to local government of Minahasa, North Sulawesi, Indonesia to be followed.
Forecasting Electric Power Generation of Photovoltaic Power System for Energy Network
NASA Astrophysics Data System (ADS)
Kudo, Mitsuru; Takeuchi, Akira; Nozaki, Yousuke; Endo, Hisahito; Sumita, Jiro
Recently, there has been an increase in concern about the global environment. Interest is growing in developing an energy network by which new energy systems such as photovoltaic and fuel cells generate power locally and electric power and heat are controlled with a communications network. We developed the power generation forecast method for photovoltaic power systems in an energy network. The method makes use of weather information and regression analysis. We carried out forecasting power output of the photovoltaic power system installed in Expo 2005, Aichi Japan. As a result of comparing measurements with a prediction values, the average prediction error per day was about 26% of the measured power.
NASA Astrophysics Data System (ADS)
Chemekov, V. V.; Kharchenko, V. V.
2013-03-01
Matters concerned with setting up environmentally clean supply of heat to dwelling houses in the resort zone of the Russian Black Sea coast on the basis of air-water type heat pumps powered from wind power installations are discussed. The investigations were carried out as applied to the system supplying heat for an individual dwelling house with an area of around 300 m2 situated in the Tuapse city. The design heat load of the building's heating system is around 8.3 kW. The Viessmann Vitocal 300 AW pump is chosen as the main source of heat supply, and a 4-kW electric heater built into a storage tank is chosen as a standby source. The selected wind power installation (the EuroWind 10 unit) has a power capacity of 13 kWe.
EMISSIONS REDUCTION DATA FOR GRID-CONNECTED PHOTOVOLTAIC POWER SYSTEMS
This study measured the pollutant emission reduction potential of 29 photovoltaic (PV) systems installed on residential and commercial building rooftops across the U.S. from 1993 through 1997. The U.S. Environmental Protection Agency (EPA) and 21 electric power companies sponsor...
Proceedings of Small Power Systems Solar Electric Workshop. Volume 2: Invited papers
NASA Technical Reports Server (NTRS)
Ferber, R. (Editor)
1978-01-01
The focus of this work shop was to present the committment to the development of solar thermal power plants for a variety of applications including utility applications. Workshop activities included panel discussions, formal presentations, small group interactive discussions, question and answer periods, and informal gatherings. Discussion on topics include: (1) solar power technology options; (2) solar thermal power programs currently underway at the DOE, JPL, Electric Power Research Institute (EPRI), and Solar Energy Research Institute (SERI); (3) power options competing with solar; (4) institutional issues; (5) environmental and siting issues; (6) financial issues; (7) energy storage; (8) site requirements for experimental solar installations, and (9) utility planning.
1997-07-18
Jet Propulsion Laboratory (JPL) workers Dan Maynard and John Shuping prepare to install a radioisotope thermoelectric generator (RTG) on the Cassini spacecraft in the Payload Hazardous Servicing Facility (PHSF). The three RTGs which will provide electrical power to Cassini on its mission to the Saturnian system are undergoing mechanical and electrical verification testing in the PHSF. RTGs use heat from the natural decay of plutonium to generate electric power. The generators enable spacecraft to operate far from the Sun where solar power systems are not feasible. The Cassini mission is scheduled for an Oct. 6 launch aboard a Titan IVB/Centaur expendable launch vehicle. Cassini is built and managed for NASA by JPL
1997-07-18
Jet Propulsion Research Lab (JPL) workers use a borescope to verify the pressure relief device bellow's integrity on a radioisotope thermoelectric generator (RTG) that has been installed on the Cassini spacecraft in the Payload Hazardous Servicing Facility. The activity is part of the mechanical and electrical verification testing of RTGs during prelaunch processing. RTGs use heat from the natural decay of plutonium to generate electrical power. The three RTGs on Cassini will enable the spacecraft to operate far from the Sun where solar power systems are not feasible. They will provide electrical power to Cassini on it seven year trip to the Saturnian system and during its four year mission at Saturn.
High-power CO laser with RF discharge for isotope separation employing condensation repression
NASA Astrophysics Data System (ADS)
Baranov, I. Ya.; Koptev, A. V.
2008-10-01
High-power CO laser can be the effective tool in such applications as isotope separation using the free-jet CRISLA method. The way of transfer from CO small-scale experimental installation to industrial high-power CO lasers is proposed through the use of a low-current radio-frequency (RF) electric discharge in a supersonic stream without an electron gun. The calculation model of scaling CO laser with RF discharge in supersonic stream was developed. The developed model allows to calculate parameters of laser installation and optimize them with the purpose of reception of high efficiency and low cost of installation as a whole. The technical decision of industrial CO laser for isotope separation employing condensation repression is considered. The estimated cost of laser is some hundred thousand dollars USA and small sizes of laser head give possibility to install it in any place.
Electrician: Apprenticeship Course Outline. Apprenticeship and Industry Training. 0307.2
ERIC Educational Resources Information Center
Alberta Advanced Education and Technology, 2007
2007-01-01
The graduate of the Electrician apprenticeship program is a certified journeyperson who will be able to: (1) have a thorough knowledge and understanding of electrical theory and its application to lighting, power and control equipment; (2) layout and install the various electrical circuits in residential, commercial, industrial and institutional…
18 CFR 1304.209 - Land-based structures/alterations.
Code of Federal Regulations, 2010 CFR
2010-04-01
... steps, pathways, boat launching ramps, marine railways located in the access corridor, bank... (electric, water-intake lines, etc.) may be placed within the access corridor as follows: (1) Power lines, poles, electrical panel, and wiring must be installed: (i) In a way that would not be hazardous to the...
Design and implementation of a 38 kW dish-Stirling concentrated solar power system
NASA Astrophysics Data System (ADS)
Yan, J.; Peng, Y. D.; Cheng, Z. R.; Liu, F. M.; Tang, X. H.
2017-11-01
Dish-Stirling concentrated solar power system (DS-CSP) is an important pathway for converting solar energy into electricity at high efficiency. In this study, a rated power 38 kW DS-CSP system was developed (installed in Xiangtan Electric Manufacturing Group). The heat engine adopted the alpha-type four cylinders double-acting Stirling engine (Stirling Biopower Flexgen S260). The absorber flux distribution simulation was conducted using ray tracing method and then the 204 m2 parabolic dish concentrator system (diameter is 17.70 m and focal length is 9.49 m) with single concentrator plus single pillar supporting has been designed and built. A water-cooled disc target and an absorber imitation device were adopted to test the tracking performance of the dish concentrator system, homogeneity of the focal spot and flux distribution of the absorber. Finally, the S260 Stirling engine was installed on the focal position of the dish concentrator and then the net output power date of the 38 kW DS-CSP system was tested. The absorber overheating problem on the DS-CSP system performance was discussed when the DS-CSP system was installed in different locations. The testing result shows that this system achieved the net output power of 38 kW and solar-to-electricity efficiency (SEE) of 25.3% with the direct normal irradiation (DNI) at 750 W/m2. The net output power can further increase to 40.5 kW with the SEE of 26.6% when the DNI reaches up to the maximum of 761 W/m2. The net output power of the 38 kW DS-CSP system has a linear function relationship with the DNI. The fitting function is Net power output=0.1003×DNI-36.129, where DNI is at the range of 460∼761 W/m2. This function could be used to predict the amount of the 38 kW DS-CSP system annual generation power.
Improved Controllers For Heaters In Toxic-Gas Combustors
NASA Technical Reports Server (NTRS)
Wishard, James; Lamb, James; Fortier, Edward; Velasquez, Hugo; Waltman, Doug
1995-01-01
Commercial electronic proportional controllers installed in place of mechanical power controllers for electric heaters in toxic-gas combustors at NASA's Jet Propulsion Laboratory. Designed to maintain temperature of heater at preset value by turning power fully on or fully off when temperature falls below or rises above that value, respectively. Solid-state power controllers overcome deficiencies of mechanical power controllers.
installations for outstanding achievements and innovative environmental practices and partnerships promoting a fleet of electric vehicles unique in their ability to export their own power and offset their cost
1997-07-18
Jet Propulsion Laboratory (JPL) workers David Rice, at left, and Johnny Melendez rotate a radioisotope thermoelectric generator (RTG) to the horizontal position on a lift fixture in the Payload Hazardous Servicing Facility. The RTG is one of three generators which will provide electrical power for the Cassini spacecraft mission to the Saturnian system. The RTGs will be installed on the powered-up spacecraft for mechanical and electrical verification testing. RTGs use heat from the natural decay of plutonium to generate electric power. The generators enable spacecraft to operate far from the Sun where solar power systems are not feasible. The Cassini mission is scheduled for an Oct. 6 launch aboard a Titan IVB/Centaur expendable launch vehicle. Cassini is built and managed for NASA by JPL
DOE Office of Scientific and Technical Information (OSTI.GOV)
William W. Glauz
The Los Angeles Department of Water and Power (LADWP) has developed one of the most recognized fuel cell demonstration programs in the United States. In addition to their high efficiencies and superior environmental performance, fuel cells and other generating technologies that can be located at or near the load, offers several electric utility benefits. Fuel cells can help further reduce costs by reducing peak electricity demand, thereby deferring or avoiding expenses for additional electric utility infrastructure. By locating generators near the load, higher reliability of service is possible and the losses that occur during delivery of electricity from remote generatorsmore » are avoided. The potential to use renewable and locally available fuels, such as landfill or sewage treatment waste gases, provides another attractive outlook. In Los Angeles, there are also many oil producing areas where the gas by-product can be utilized. In June 2000, the LADWP contracted with FCE to install and commission the precommercial 250kW MCFC power plant. The plant was delivered, installed, and began power production at the JFB in August 2001. The plant underwent manufacturer's field trials up for 18 months and was replace with a commercial plant in January 2003. In January 2001, the LADWP contracted with FCE to provide two additional 250kW MCFC power plants. These commercial plants began operations during mid-2003. The locations of these plants are at the Terminal Island Sewage Treatment Plant at the Los Angeles Harbor (for eventual operation on digester gas) and at the LADWP Main Street Service Center east of downtown Los Angeles. All three carbonate fuel cell plants received partial funding through the Department of Defense's Climate Change Fuel Cell Buydown Program. This report covers the technical evaluation and benefit-cost evaluation of the Main Street 250kW MCFC power plant during its first year of operation from September 2003 to August 2004. The data for the month of September 2004 was not available at the time this report was prepared. An addendum to this report will be prepared and transmitted to the Department of Energy once this data becomes available. This fuel cell power plant was originally intended to be installed at an American Airlines facility located at Los Angeles International Airport, however, due to difficulties in obtaining a site, the plant was ultimately installed at the LADWP's Distributed Generation Test Facility at it's Main Street Service Center.« less
Blow molding electric drives of Mechanical Engineering
NASA Astrophysics Data System (ADS)
Bukhanov, S. S.; Ramazanov, M. A.; Tsirkunenko, A. T.
2018-03-01
The article considers the questions about the analysis of new possibilities, which gives the use of adjustable electric drives for blowing mechanisms of plastic production. Thus, the use of new semiconductor converters makes it possible not only to compensate the instability of the supply network by using special dynamic voltage regulators, but to improve (correct) the power factor. The calculation of economic efficiency in controlled electric drives of blowing mechanisms is given. On the basis of statistical analysis, the calculation of the reliability parameters of the regulated electric drives’ elements under consideration is given. It is shown that an increase in the reliability of adjustable electric drives is possible both due to overestimation of the electric drive’s installed power, and in simpler schemes with pulse-vector control.
46 CFR 120.330 - Distribution panels and switchboards.
Code of Federal Regulations, 2010 CFR
2010-10-01
... INSTALLATION Power Sources and Distribution Systems § 120.330 Distribution panels and switchboards. (a) Each... vessel's wiring, must not have electrically unshielded or uninsulated surfaces. (k) Switchboards and...
NASA Astrophysics Data System (ADS)
Kaczmarczyk, Tomasz Z.; Ihnatowicz, Eugeniusz; Żywica, Grzegorz; Kiciński, Jan
2015-11-01
The paper presents the results of experimental investigations of the ORC system with two scroll expanders which have been used as a source of electricity. Theworking fluidwas HFE7100 - a newly engineered fluid with a unique heat transfer and favourable environmental properties. In the ORC system three heat exchangers were used (evaporator, regenerator, condenser) and before expanders the droplet separator was installed. As a source of heat an innovative biomass boiler was used. Studies have been carried out for the expanders worked in series and in parallel. The paper presents the thermal and fluidflow properties of the ORC installation for the selected flow rates and different temperatures of the working medium. The characteristics of output electrical power, operating speed and vibrations for scroll expanders were also presented.
46 CFR 129.315 - Power sources for OSVs of 100 or more gross tons.
Code of Federal Regulations, 2010 CFR
2010-10-01
... VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.315 Power sources for OSVs... one set must be independent of the main propulsion plant. A generator not independent of the main propulsion plant must comply with § 111.10-4(d) of this chapter. With any one generating set stopped, the...
ERIC Educational Resources Information Center
Peterson, James N.; Hess, Herbert L.
An undergraduate capstone engineering design project now provides hydroelectric power to a remote wilderness location. Students investigated the feasibility of designing, building, and installing a 4kW hydroelectric system to satisfy the need for electric power to support the research and teaching functions of Taylor Ranch, a university facility…
2000-09-18
An engineer at AeroVironment's Design Development Center in Simi Valley, California, closely inspects a set of silicon solar cells for potential defects. The cells, fabricated by SunPower, Inc., of Sunnyvale, California, are among 64,000 solar cells which have been installed on the Helios Prototype solar-powered aircraft to provide power to its 14 electric motors and operating systems.
2000-09-18
A technician at AeroVironment's Design Development Center in Simi Valley, California, checks a panel of silicon solar cells for conductivity and voltage. The bi-facial cells, fabricated by SunPower, Inc., of Sunnyvale, California, are among 64,000 solar cells which have been installed on the Helios Prototype solar-powered aircraft to provide power to its 14 electric motors and operating systems.
A central microprocessor controlled electrical storage heating system
NASA Astrophysics Data System (ADS)
Horstmann, H.
1980-12-01
The use of a microprocessor to control the reloading of electrical storage heaters not only during the night, but whenever the electrical grid is cycled down, was tested. The test setup, used to control a total of about 10 MW installed storage heating in 96 dwellings, is described. It is demonstrated that additional consumers can be connected to the system without demand for more power stations.
DOE/NREL supported wind energy activities in Indonesia
DOE Office of Scientific and Technical Information (OSTI.GOV)
Drouilhet, S.
1997-12-01
This paper describes three wind energy related projects which are underway in Indonesia. The first is a USAID/Winrock Wind for Island and Nongovernmental Development (WIND) project. The objectives of this project are to train local nongovernmental organizations (NGOs) in the siting, installation, operation, and maintenance of small wind turbines. Then to install up to 20 wind systems to provide electric power for productive end uses while creating micro-enterprises which will generate enough revenue to sustain the wind energy systems. The second project is a joint Community Power Corporation/PLN (Indonesian National Electric Utility) case study of hybrid power systems in villagemore » settings. The objective is to evaluate the economic viability of various hybrid power options for several different situations involving wind/photovoltaics/batteries/diesel. The third project is a World Bank/PLN preliminary market assessment for wind/diesel hybrid systems. The objective is to estimate the size of the total potential market for wind/diesel hybrid power systems in Indonesia. The study will examine both wind retrofits to existing diesel mini-grids and new wind-diesel plants in currently unelectrified villages.« less
46 CFR 129.540 - Remote stopping-systems on OSVs of 100 or more gross tons.
Code of Federal Regulations, 2010 CFR
2010-10-01
...) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Miscellaneous Electrical Systems § 129.540 Remote stopping... subpart 111.103 of this chapter: (1) For each propulsion unit, in the pilothouse. (2) For each discharge pump for bilge slop or dirty oil, at the deck discharge. (3) For each powered ventilation system...
Home Photovoltaic System Design in Pangkalpinang City
NASA Astrophysics Data System (ADS)
Sunanda, Wahri
2018-02-01
This research aims to obtain the design of home photovoltaic systems in Pangkalpinang and the opportunity of economic savings. The system consists of photovoltaic with batteries. Based on electricity consumption of several houses with installed power of 1300 VA and 2200 VA in Pangkalpinang for one year, the daily load of photovoltaic system is varied to 40%, 30% and 20% of the average value of the daily home electricity consumption. The investment costs, the cost of replacement parts and the cost of electricity consumption accrued to PLN during lifetime of systems (25 years) are also calculated. The result provided that there are no economic saving opportunities for photovoltaic systems with batteries at home with installed power of 1300 VA and 2200 VA in Pangkalpinang. The most economical is the photovoltaic system with the daily load of 20% of the average value of the daily home electricity consumption. The configuration of photovoltaic system for 1300 VA home consists of 10 modules of 200 wattpeak and 4 batteries 150 AH, 12 Volt while photovoltaic system for 2200 VA home consists of 15 modules of 200 wattpeak and 6 batteries 150 AH,12Volt.
Simplified installation of thrust bearings
NASA Technical Reports Server (NTRS)
Sensenbaugh, N. D.
1980-01-01
Special handling sleeve, key to method of installing thrust bearings, was developed for assembling bearings on shaft of low-pressure oxygen turbo-pump. Method eliminates cooling and vacuum-drying steps which saves time, while also eliminating possibility of corrosion formation. Procedure saves energy because it requires no liquid nitrogen for cooling shaft and no natural gas or electric power for operating vacuum oven.
Branchburg Solar Farm and Carport
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gregory, John
2013-10-23
To meet the goal of becoming a model of green, clean, and efficient consumer of energy, the Township of Branchburg will install of a 250kw solar farm to provide energy for the Township of Branchburg Municipal Building, a 50kw Solar carport to provide power to the Municipal Annex, purchase 3 plug in hybrid-electric vehicles, and install 3 dual-head charging stations.
46 CFR 183.376 - Grounded distribution systems (neutral grounded).
Code of Federal Regulations, 2013 CFR
2013-10-01
... VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.376... propulsion, power, lighting, or distribution system having a neutral bus or conductor must have the neutral... 46 Shipping 7 2013-10-01 2013-10-01 false Grounded distribution systems (neutral grounded). 183...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-11
... megawatts of electricity from wind turbine generators (WTGs). The proposed project includes a wind energy... about the installation of red flashing lights on wind turbine generators per Federal Aviation... DEPARTMENT OF ENERGY Western Area Power Administration; Grapevine Canyon Wind Project Record of...
Security Vulnerability Trends Related to Electric Power Supplied at Military Installations
2010-03-01
would result in lower costs and more reliable power to the end-user. With the passing of the Public Utility Regulatory Policies Act ( PURPA ) in 1978...24 wholesale competition was on the upturn, which was the first step towards a market economy (Brown, 2005). PURPA essentially regulated
Cassini's RTGs undergo mechanical and electrical verification tests in the PHSF
NASA Technical Reports Server (NTRS)
1997-01-01
Carrying a neutron radiation detector, Fred Sanders (at center), a health physicist with the Jet Propulsion Laboratory (JPL), and other health physics personnel monitor radiation in the Payload Hazardous Servicing Facility after three radioisotope thermoelectric generators (RTGs) were installed on the Cassini spacecraft for mechanical and electrical verification tests. The RTGs will provide electrical power to Cassini on its 6.7-year trip to the Saturnian system and during its four-year mission at Saturn. RTGs use heat from the natural decay of plutonium to generate electric power. The generators enable spacecraft to operate at great distances from the Sun where solar power systems are not feasible. The Cassini mission is targeted for an Oct. 6 launch aboard a Titan IVB/Centaur expendable launch vehicle. Cassini is built and managed by JPL.
Business Case for Fuel Cells 2016
DOE Office of Scientific and Technical Information (OSTI.GOV)
Curtin, Sandra; Gangi, Jennifer; Benjamin, Thomas G.
The report provides an overview of recent private sector fuel cell installations at U.S. businesses as of December 31, 2016. This list is by no means exhaustive. Over the past few decades, hundreds of thousands of fuel cells have been installed around the world, for primary or backup power, as well as in various other applications including portable and emergency backup power. Fuel cells have also been deployed in other applications such as heat and electricity for homes and apartments, material handling, passenger vehicles, buses, and remote, off-grid sites.
Residential Solar PV Systems in the Carolinas: Opportunities and Outcomes.
Alqahtani, Bandar Jubran; Holt, Kyra Moore; Patiño-Echeverri, Dalia; Pratson, Lincoln
2016-02-16
This paper presents a first-order analysis of the feasibility and technical, environmental, and economic effects of large levels of solar photovoltaic (PV) penetration within the services areas of the Duke Energy Carolinas (DEC) and Duke Energy Progress (DEP). A PV production model based on household density and a gridded hourly global horizontal irradiance data set simulates hourly PV power output from roof-top installations, while a unit commitment and real-time economic dispatch (UC-ED) model simulates hourly system operations. We find that the large generating capacity of base-load nuclear power plants (NPPs) without ramping capability in the region limits PV integration levels to 5.3% (6510 MW) of 2015 generation. Enabling ramping capability for NPPs would raise the limit of PV penetration to near 9% of electricity generated. If the planned retirement of coal-fired power plants together with new installations and upgrades of natural gas and nuclear plants materialize in 2025, and if NPPs operate flexibly, then the share of coal-fired electricity will be reduced from 37% to 22%. A 9% penetration of electricity from PV would further reduce the share of coal-fired electricity by 4-6% resulting in a system-wide CO2 emissions rate of 0.33 to 0.40 tons/MWh and associated abatement costs of 225-415 (2015$ per ton).
The right place for the right job in the photovoltaic life cycle.
Kawajiri, Kotaro; Genchi, Yutaka
2012-07-03
The potential for photovoltaic power generation (PV) to reduce primary energy consumption (PEC) and CO(2) emissions depends on the physical locations of each stage of its life cycle. When stages are optimally located, CO(2) emissions are reduced nearly ten times as much as when each stage is located in the country having the largest current market share. The usage stage contributes the most to reducing CO(2) emissions and PEC, and total CO(2) emissions actually increase when PV is installed in countries having small CO(2) emissions from electricity generation. Global maps of CO(2) reduction potential indicate that Botswana and Gobi in Mongolia are the optimal locations to install PV due to favorable conditions for PV power generation and high CO(2) emissions from current electricity generation. However, the small electricity demand in those countries limits the contribution to global CO(2) reduction. The type of PVs has a small but significant effect on life cycle PEC and CO(2) emissions.
NASA Technical Reports Server (NTRS)
Brandhorst, Henry W., Jr.; Howell, Joe (Technical Monitor)
2002-01-01
Electric propulsion has emerged as a cost-effective solution to a wide range of satellite applications. Deep Space 1 successfully demonstrated electric propulsion as the primary propulsion source for a satellite. The POWOW concept is a solar-electric propelled spacecraft capable of significant cargo and short trip times for traveling to Mars. There it would enter areosynchronous orbit (Mars GEO equivalent) and beam power to surface installations via lasers. The concept has been developed with industrial partner expertise in high efficiency solar cells, advanced concentrator modules, innovative arrays, and high power electric propulsion systems. The present baseline spacecraft design providing 898 kW using technologies expected to be available in 2003 will be described. Areal power densities approaching 350 W/sq m at 80 C operating temperatures and wing level specific powers of over 350 W/kg are projected. Details of trip times and payloads to Mars are presented. Electric propulsion options include Hall, MPD, and ion thrusters of various power levels and trade studies have been conducted to define the most advantageous options. Because the design is modular, learning curve methodology has been applied to determine expected cost reductions and is included.
Cassini's RTGs undergo mechanical and electrical verification tests in the PHSF
NASA Technical Reports Server (NTRS)
1997-01-01
Jet Propulsion Laboratory (JPL) employees bolt a radioisotope thermoelectric generator (RTG) onto the Cassini spacecraft, at left, while other JPL workers, at right, operate the installation cart on a raised platform in the Payload Hazardous Servicing Facility (PHSF). Cassini will be outfitted with three RTGs. The power units are undergoing mechanical and electrical verification tests in the PHSF. The RTGs will provide electrical power to Cassini on its 6.7-year trip to the Saturnian system and during its four-year mission at Saturn. RTGs use heat from the natural decay of plutonium to generate electric power. The generators enable spacecraft to operate at great distances from the Sun where solar power systems are not feasible. The Cassini mission is targeted for an Oct. 6 launch aboard a Titan IVB/Centaur expendable launch vehicle. Cassini is built and managed by JPL.
Cassini's RTGs undergo mechanical and electrical verification tests in the PHSF
NASA Technical Reports Server (NTRS)
1997-01-01
Jet Propulsion Laboratory (JPL) employees Norm Schwartz, at left, and George Nakatsukasa transfer one of three radioisotope thermoelectric generators (RTGs) to be used on the Cassini spacecraft from the installation cart to a lift fixture in preparation for returning the power unit to storage. The three RTGs underwent mechanical and electrical verification testing in the Payload Hazardous Servicing Facility. The RTGs will provide electrical power to Cassini on its 6.7-year trip to the Saturnian system and during its four-year mission at Saturn. RTGs use heat from the natural decay of plutonium to generate electric power. The generators enable spacecraft to operate at great distances from the Sun where solar power systems are not feasible. The Cassini mission is targeted for an Oct. 6 launch aboard a Titan IVB/Centaur expendable launch vehicle. Cassini is built and managed by JPL.
NASA Technical Reports Server (NTRS)
1988-01-01
ARCO Solar manufactures PV Systems tailored to a broad variety of applications. PV arrays are routinely used at remote communications installations to operate large microwave repeaters, TV and radio repeaters rural telephone, and small telemetry systems that monitor environmental conditions. Also used to power agricultural water pumping systems, to provide electricity for isolated villages and medical clinics, for corrosion protection for pipelines and bridges, to power railroad signals, air/sea navigational aids, and for many types of military systems. ARCO is now moving into large scale generation for utilities.
NASA Astrophysics Data System (ADS)
Rachi, Hideki
Sodium-Sulfur battery (NAS battery), which has more than 3 times of energy density compared with the conventional lead-acid battery and can be compactly established, has a great installation effects as a distributed energy storage system in the urban area which consumes big electric power. For the power company, NAS battery contributes to the load leveling, the supply capability up at the peak period, the efficient operation of the electric power equipment and the reduction of the capital expenditure. And for the customer, it is possible to enjoy the reduction of the electricity charges by utilizing nighttime electric power and the securing of a security. The contribution to the highly sophisticated information society where the higher electric power quality is desired, mainly office buildings and factories by the progress of IT, is very big. Tokyo Electric Power Company (TEPCO) developed the elementary technology of NAS battery from 1984 and ended the development of practical battery which has long-term durability and the safety and the performance verification of the megawatt scale. Finally TEPCO accomplished the practical application and commercialization of the stationary energy storage technology by NAS battery. In this paper, we introduces about conquered problems until practical application and commercialization.
NASA Astrophysics Data System (ADS)
Abdoulaye, D.; Koalaga, Z.; Zougmore, F.
2012-02-01
This paper deals with a key solution for power outages problem experienced by many African countries and this through grid-connected photovoltaic (PV) systems with batteries storage. African grids are characterized by an insufficient power supply and frequent interruptions. Due to this fact, users who especially use classical grid-connected photovoltaic systems are unable to profit from their installation even if there is sun. In this study, we suggest the using of a grid-connected photovoltaic system with batteries storage as a solution to these problems. This photovoltaic system works by injecting the surplus of electricity production into grid and can also deliver electricity as a stand-alone system with all security needed. To achieve our study objectives, firstly we conducted a survey of a real situation of one African electrical grid, the case of Burkina Faso (SONABEL: National Electricity Company of Burkina). Secondly, as study case, we undertake a sizing, a modeling and a simulation of a grid-connected PV system with batteries storage for the LAME laboratory at the University of Ouagadougou. The simulation shows that the proposed grid-connected system allows users to profit from their photovoltaic installation at any time even if the public electrical grid has some failures either during the day or at night.
NASA Astrophysics Data System (ADS)
Liu, Chuncheng; Wang, Chongyang; Mao, Long; Zha, Chuanming
2016-11-01
Substation high voltage electrical equipment such as mutual inductor, circuit interrupter, disconnecting switch, etc., has played a key role in maintaining the normal operation of the power system. When the earthquake disaster, the electrical equipment of the porcelain in the transformer substation is the most easily to damage, causing great economic losses. In this paper, using the method of numerical analysis, the establishment of a typical high voltage electrical equipment of three dimensional finite element model, to study the seismic response of a typical SF6 circuit breaker, at the same time, analysis and contrast the installation ring tuned mass damper (TMD damper for short), by changing the damper damping coefficient and the mass block, install annular TMD vibration control effect is studied. The results of the study for guiding the seismic design of high voltage electrical equipment to provide valuable reference.
2000-08-30
Workers in the Space Station Processing Facility prepare an overhead crane they will use to move a solar array, a component of the International Space Station, for installation onto the Integrated Equipment Assembly. The solar array is the second one being installed. They are scheduled to be launched on mission STS-97 in late November along with the P6 truss. The Station’s electrical power system (EPS) will use eight photovoltaic solar arrays to convert sunlight to electricity. Each of the eight solar arrays will be 112 feet long by 39 feet wide. The solar arrays are mounted on a “blanket” that can be folded like an accordion for delivery. Once in orbit, astronauts will deploy the blankets to their full size. Gimbals will be used to rotate the arrays so that they will face the Sun to provide maximum power to the Space Station
Real time monitoring system used in route planning for the electric vehicle
NASA Astrophysics Data System (ADS)
Ionescu, LM; Mazare, A.; Serban, G.; Ionita, S.
2017-10-01
The electric vehicle is a new consumer of electricity that is becoming more and more widespread. Under these circumstances, new strategies for optimizing power consumption and increasing vehicle autonomy must be designed. These must include route planning along with consumption, fuelling points and points of interest. The hardware and software solution proposed by us allows: non-invasive monitoring of power consumption, energy autonomy - it does not add any extra consumption, data transmission to a server and data fusion with the route, the points of interest of the route and the power supply points. As a result: an optimal route planning service will be provided to the driver, considering the route, the requirements of the electric vehicle and the consumer profile. The solution can be easily installed on any type of electric car - it does not involve any intervention on the equipment.
NASA Electric Aircraft Test Bed (NEAT) Development Plan - Design, Fabrication, Installation
NASA Technical Reports Server (NTRS)
Dyson, Rodger W.
2016-01-01
As large airline companies compete to reduce emissions, fuel, noise, and maintenance costs, it is expected that more of their aircraft systems will shift from using turbofan propulsion, pneumatic bleed power, and hydraulic actuation, to instead using electrical motor propulsion, generator power, and electrical actuation. This requires new flight-weight and flight-efficient powertrain components, fault tolerant power management, and electromagnetic interference mitigation technologies. Moreover, initial studies indicate some combination of ambient and cryogenic thermal management and relatively high bus voltages when compared to state of practice will be required to achieve a net system benefit. Developing all these powertrain technologies within a realistic aircraft architectural geometry and under realistic operational conditions requires a unique electric aircraft testbed. This report will summarize existing testbed capabilities located in the U.S. and details the development of a unique complementary testbed that industry and government can utilize to further mature electric aircraft technologies.
MOD-OA 200 kW wind turbine generator engineeringing
NASA Technical Reports Server (NTRS)
Andersen, T. S.; Bodenschatz, C. A.; Eggers, A. G.; Hughes, P. S.; Lampe, R. F.
1980-01-01
Engineering drawings and the detailed mechanical and electrical design of a horizontal-axis wind turbine designed for DOE at the NASA Lewis Research Center and installed in Clayton, New Mexico are discussed. The drawings show the hub, pitch change mechanism, drive train, nacelle equipment, yaw drive system, tower, foundation, electrical power systems, and the control and safety systems.
46 CFR 111.95-7 - Wiring of boat winch components.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Wiring of boat winch components. 111.95-7 Section 111.95... SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-7 Wiring of boat winch... electric installation from all sources of potential. The switch must be in series with and on the supply...
NASA Astrophysics Data System (ADS)
Zulkifli, S. A.; Syaifuddin Mohd, M.; Maharun, M.; Bakar, N. S. A.; Idris, S.; Samsudin, S. H.; Firmansyah; Adz, J. J.; Misbahulmunir, M.; Abidin, E. Z. Z.; Syafiq Mohd, M.; Saad, N.; Aziz, A. R. A.
2015-12-01
One configuration of the hybrid electric vehicle (HEV) is the split-axle parallel hybrid, in which an internal combustion engine (ICE) and an electric motor provide propulsion power to different axles. A particular sub-type of the split-parallel hybrid does not have the electric motor installed on board the vehicle; instead, two electric motors are placed in the hubs of the non-driven wheels, called ‘hub motor’ or ‘in-wheel motor’ (IWM). Since propulsion power from the ICE and IWM is coupled through the vehicle itself, its wheels and the road on which it moves, this particular configuration is termed ‘through-the-road’ (TTR) hybrid. TTR configuration enables existing ICE-powered vehicles to be retrofitted into an HEV with minimal physical modification. This work describes design of a retrofit- conversion TTR-IWM hybrid vehicle - its sub-systems and development work. Operating modes and power flow of the TTR hybrid, its torque coupling and resultant traction profiles are initially discussed.
NASA Astrophysics Data System (ADS)
Rimov, A. A.; Chukanova, T. I.; Trofimov, Yu. V.
2016-12-01
Data on the comparative analysis variants of the quality of power installations (benchmarking) applied in the power industry is systematized. It is shown that the most efficient variant of implementation of the benchmarking technique is the analysis of statistical distributions of the indicators in the composed homogenous group of the uniform power installations. The benchmarking technique aimed at revealing the available reserves on improvement of the reliability and heat efficiency indicators of the power installations of the thermal power plants is developed in the furtherance of this approach. The technique provides a possibility of reliable comparison of the quality of the power installations in their homogenous group limited by the number and adoption of the adequate decision on improving some or other technical characteristics of this power installation. The technique provides structuring of the list of the comparison indicators and internal factors affecting them represented according to the requirements of the sectoral standards and taking into account the price formation characteristics in the Russian power industry. The mentioned structuring ensures traceability of the reasons of deviation of the internal influencing factors from the specified values. The starting point for further detail analysis of the delay of the certain power installation indicators from the best practice expressed in the specific money equivalent is positioning of this power installation on distribution of the key indicator being a convolution of the comparison indicators. The distribution of the key indicator is simulated by the Monte-Carlo method after receiving the actual distributions of the comparison indicators: specific lost profit due to the short supply of electric energy and short delivery of power, specific cost of losses due to the nonoptimal expenditures for repairs, and specific cost of excess fuel equivalent consumption. The quality loss indicators are developed facilitating the analysis of the benchmarking results permitting to represent the quality loss of this power installation in the form of the difference between the actual value of the key indicator or comparison indicator and the best quartile of the existing distribution. The uncertainty of the obtained values of the quality loss indicators was evaluated by transforming the standard uncertainties of the input values into the expanded uncertainties of the output values with the confidence level of 95%. The efficiency of the technique is demonstrated in terms of benchmarking of the main thermal and mechanical equipment of the extraction power-generating units T-250 and power installations of the thermal power plants with the main steam pressure 130 atm.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-05
... Nuclear Power Plant, Units 1 and 2 (CPNPP), and its Independent Spent Fuel Storage Installation Facility... licensee, acting on behalf of Energy Future Holdings Corporation (EFH), Energy Future Competitive Holdings Company (EFCH), Texas Competitive Electric Holdings Company LLC, and Luminant Holding Company LLC, the...
Solar Energy Technician/Installer
ERIC Educational Resources Information Center
Moore, Pam
2007-01-01
Solar power (also known as solar energy) is solar radiation emitted from the sun. Large panels that absorb the sun's energy as the sun beats down on them gather solar power. The energy in the rays can be used for heat (solar thermal energy) or converted to electricity (photovoltaic energy). Each solar energy project, from conception to…
1997-07-18
This radioisotope thermoelectric generator (RTG), at center, will undergo mechanical and electrical verification testing now that it has been installed on the Cassini spacecraft in the Payload Hazardous Servicing Facility. A handling fixture, at far left, is still attached. Three RTGs will provide electrical power to Cassini on its 6.7-year trip to the Saturnian system and during its four-year mission at Saturn. RTGs use heat from the natural decay of plutonium to generate electric power. The generators enable spacecraft to operate far from the Sun where solar power systems are not feasible. The Cassini mission is scheduled for an Oct. 6 launch aboard a Titan IVB/Centaur expendable launch vehicle. Cassini is built and managed for NASA by the Jet Propulsion Laboratory
NASA Astrophysics Data System (ADS)
Kumagai, Daisuke; Ohsaki, Hiroyuki; Tomita, Masaru
2016-12-01
A superconducting power cable has merits of a high power transmission capacity, transmission losses reduction, a compactness, etc., therefore, we have been studying the feasibility of applying superconducting power cables to DC electric railway feeding systems. However, a superconducting power cable is required to be cooled down and kept at a very low temperature, so it is important to reveal its thermal and cooling characteristics. In this study, electric circuit analysis models of the system and thermal analysis models of superconducting cables were constructed and the system behaviors were simulated. We analyzed the heat generation by a short circuit accident and transient temperature distribution of the cable to estimate the value of temperature rise and the time required from the accident. From these results, we discussed a feasibility of superconducting cables for DC electric railway feeding systems. The results showed that the short circuit accident had little impact on the thermal condition of a superconducting cable in the installed system.
Integrated Field Testing of Fuel Cells and Micro-Turbines
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jerome R. Temchin; Stephen J. Steffel
A technical and economic evaluation of the prospects for the deployment of distributed generation on Long Beach Island, New Jersey concluded that properly sited DG would defer upgrading of the electric power grid for 10 years. This included the deployment of fuel cells or microturbines as well as reciprocating engines. The implementation phase of this project focused on the installation of a 120 kW CHP microturbine system at the Harvey Cedars Bible Conference in Harvey Cedars, NJ. A 1.1 MW generator powered by a gas-fired reciprocating engine for additional grid support was also installed at a local substation. This reportmore » contains installation and operation issues as well as the utility perspective on DG deployment.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rana Zucchi, Global Energy Concepts, LLC; Brad Reeve, Kotzebue Electric Association; DOE Project Officer - Doug Hooker
The Kotzebue Wind Power Project is a joint undertaking of the U.S. Department of Energy (DOE); Kotzebue Electric Association (KEA); and the Alaska Energy Authority (AEA). The goal of the project is to develop, construct, and operate a wind power plant interconnected to a small isolated utility grid in an arctic climate in Northwest Alaska. The primary objective of KEA’s wind energy program is to bring more affordable electricity and jobs to remote Alaskan communities. DOE funding has allowed KEA to develop a multi-faceted approach to meet these objectives that includes wind project planning and development, technology transfer, and communitymore » outreach. The first wind turbines were installed in the summer of 1997 and the newest turbines were installed in the spring of 2007. The total installed capacity of the KEA wind power project is 1.16 MW with a total of 17 turbines rated between 65 kW and 100 kW. The operation of the wind power plant has resulted in a wind penetration on the utility system in excess of 35% during periods of low loads. This document and referenced attachments are presented as the final technical report for the U.S. Department of Energy (DOE) grant agreement DE-FG36-97GO10199. Interim deliverables previously submitted are also referenced within this document and where reasonable to do so, specific sections are incorporated in the report or attached as appendices.« less
Importance of hard coal in electricity generation in Poland
NASA Astrophysics Data System (ADS)
Plewa, Franciszek; Strozik, Grzegorz
2017-11-01
Polish energy sector is facing a number of challenges, in particular as regards the reconstruction of production potential, diversification of energy sources, environmental issues, adequate fuels supplies and other. Mandatory implementation of Europe 2020 strategy in terms of “3x20” targets (20% reduction of greenhouse gases, 20% of energy from renewable sources, and 20% increase of efficiency in energy production) requires fast decision, which have to be coordinated with energetic safety issues, increasing demands for electric energy, and other factors. In Poland almost 80% of power is installed in coal fired power plants and energy from hard coals is relatively less expensive than from other sources, especially renewable. The most of renewable energy sources power plants are unable to generate power in amounts which can be competitive with coal fires power stations and are highly expensive, what leads o high prices of electric energy. Alternatively, new generation of coal fired coal power plants is able to significantly increase efficiency, reduce carbon dioxide emission, and generate less expensive electric power in amounts adequate to the demands of a country.
POwer WithOut Wire (POWOW): A SEP Concept for Space Exploration
NASA Technical Reports Server (NTRS)
Brandhorst, Henry W., Jr.; ONeill, Mark
2000-01-01
Electric propulsion has emerged as a cost-effective solution to a wide range of satellite applications. Deep Space 1 demonstrated electric propulsion as a primary propulsion source for a spacecraft. The POwer WithOut Wires (POWOW) concept has been developed as a solar electric propelled spacecraft that would travel to Mars, for example, enter selenosynchronous orbit and then use lasers to beam power to surface installations. This concept has been developed with industrial expertise in high efficiency solar cells, advanced concentrator modules, innovative arrays, and high power electric propulsion systems. The paper will present the latest version of the spacecraft, the technologies involved, possible missions and trip times to Mars and laser beaming options. The POWOW spacecraft is a general purpose solar electric propulsion system that includes technologies that are directly applicable to commercial and government spacecraft with power levels ranging from 4 kW in Low Earth Orbits (LEO) to about 1 MW. The system is modular and expandable. Learning curve costing methodologies are used to demonstrate cost effectiveness of a modular system.
64. ELECTRIC MOTOR HAYES STREET POWERHOUSE 1905: Photocopy ...
64. ELECTRIC MOTOR - HAYES STREET POWERHOUSE - 1905: Photocopy of April 1905 photograph showing an early electric motor installation used to drive the winding machinery at the Hayes Street powerhouse of the United Railroads of San Francsico. A portion of the steam engine originally used to power the machinery is visible behind the winding sheave in the left background of the photograph. - San Francisco Cable Railway, Washington & Mason Streets, San Francisco, San Francisco County, CA
40 CFR 98.452 - GHGs to report.
Code of Federal Regulations, 2014 CFR
2014-07-01
... must report SF6 and PFC emissions at the facility level. Annual emissions from the facility must include SF6 and PFC emissions from equipment that is installed at an off-site electric power transmission...
40 CFR 98.452 - GHGs to report.
Code of Federal Regulations, 2013 CFR
2013-07-01
... must report SF6 and PFC emissions at the facility level. Annual emissions from the facility must include SF6 and PFC emissions from equipment that is installed at an off-site electric power transmission...
40 CFR 98.452 - GHGs to report.
Code of Federal Regulations, 2012 CFR
2012-07-01
... must report SF6 and PFC emissions at the facility level. Annual emissions from the facility must include SF6 and PFC emissions from equipment that is installed at an off-site electric power transmission...
Port of Los Angeles: Off-Road Heavy Duty Equipment and Infrastructure Enhancements
Description of a project at the Port of Los Angeles to replace a diesel crane with an electric crane. Additionally includes information on shore power installation, and cargo handling equipment upgrades.
Assessment of a Solar Cell Panel Spatial Arrangement Influence on Electricity Generation
NASA Astrophysics Data System (ADS)
Anisimov, I. A.; Burakova, L. N.; Burakova, A. D.; Burakova, O. D.
2017-05-01
The research evaluates the impact of the spatial arrangement of solar cell panels on the amount of electricity generated (power generated by solar cell panel) in Tyumen. Dependences of the power generated by the solar panel on the time of day, air temperature, weather conditions and the spatial arrangement are studied. Formulas for the calculation of the solar cell panel inclination angle which provides electricity to urban infrastructure are offered. Based on the data in the future, changing of inclination angle of solar cell panel will be confirmed experimentally during the year in Tyumen, and recommendations for installing solar cell panels in urban infrastructure will be developed.
Development of a Novel Wireless Electric Power Transfer System for Space Applications
NASA Technical Reports Server (NTRS)
VazquezRamos, Gabriel; Yuan, Jiann-Shiun
2011-01-01
This paper will introduce a new implementation for wireless electric power transfer systems: space applications. Due to the risks that constitute the use of electrical connector for some space missions/applications, a simple wireless power system design approach will be evaluated as an alternative for the use of electrical connectors. This approach takes into consideration the overall system performance by designing the magnetic resonance elements and by verifying the overall system electrical behavior. System characterization is accomplished by executing circuit and analytical simulations using Matlab(TradeMark) and LTSpiceIV(TradeMark) software packages. The design methodology was validated by two different experiments: frequency consideration (design of three magnetic elements) and a small scale proof-ofconcept prototype. Experiment results shows successful wireless power transfer for all the cases studied. The proof-of-concept prototype provided approx.4 W of wireless power to the load (light bulb) at a separation of 3 cm from the source. In addition. a resonant circuit was designed and installed to the battery terminals of a handheld radio without batteries, making it tum on at a separation of approx.5 cm or less from the source. It was also demonstrated by prototype experimentation that multiple loads can be powered wirelessly at the same time with a single electric power source.
1997-07-19
Jet Propulsion Laboratory (JPL) employees bolt a radioisotope thermoelectric generator (RTG) onto the Cassini spacecraft, at left, while other JPL workers, at right, operate the installation cart on a raised platform in the Payload Hazardous Servicing Facility (PHSF). Cassini will be outfitted with three RTGs. The power units are undergoing mechanical and electrical verification tests in the PHSF. The RTGs will provide electrical power to Cassini on its 6.7-year trip to the Saturnian system and during its four-year mission at Saturn. RTGs use heat from the natural decay of plutonium to generate electric power. The generators enable spacecraft to operate at great distances from the Sun where solar power systems are not feasible. The Cassini mission is targeted for an Oct. 6 launch aboard a Titan IVB/Centaur expendable launch vehicle. Cassini is built and managed by JPL
1997-07-19
Jet Propulsion Laboratory (JPL) employees Norm Schwartz, at left, and George Nakatsukasa transfer one of three radioisotope thermoelectric generators (RTGs) to be used on the Cassini spacecraft from the installation cart to a lift fixture in preparation for returning the power unit to storage. The three RTGs underwent mechanical and electrical verification testing in the Payload Hazardous Servicing Facility. The RTGs will provide electrical power to Cassini on its 6.7-year trip to the Saturnian system and during its four-year mission at Saturn. RTGs use heat from the natural decay of plutonium to generate electric power. The generators enable spacecraft to operate at great distances from the Sun where solar power systems are not feasible. The Cassini mission is targeted for an Oct. 6 launch aboard a Titan IVB/Centaur expendable launch vehicle. Cassini is built and managed by JPL
DOE Office of Scientific and Technical Information (OSTI.GOV)
Burr, M.T.
1995-07-01
Vietnam is moving fast. Facing the need to double its installed power generation capacity by the year 2000, Vietnam is pursuing a range of development alternatives to add an estimated 3,000 MW of new power plants. As part of the country`s progress toward a market economy, Vietnam has relaxed its rules regarding investment in power plants. The country enacted a new electricity law early in 1995, paving the way for private participation in the power sector.
Worldwide Report, Arms Control
1985-08-29
BRIEFS IAEA TO INSPECT SOVIET PLANTS —Vienna, 7 Aug (AFP)—The International Atomic Energy Agency (IAEA) will inspect two nuclear power stations and an... power —equal to the output of about 32 nuclear power plants —must be provided, which then, to be sure, would be needed for only about 2 minutes. But...which requires electric power plants conceived especially for this purpose. If, in installing this capacity, one assumes $300 per kilowatt—a value
System protection from atmospheric electricity for aerostats with conducting tethers
NASA Astrophysics Data System (ADS)
Wheeler, M. S.; Beach, G. R.; Jakubowski, P. R.; Fisher, F. A.
1988-04-01
Aerostat power tethers have demonstrated survival of lightning strikes, but they usually have to be reterminated or replaced afterward. Two requirements are given for the prevention of lightning damage to the tether to about 100 kA: installation of a metal-to-metal contact on the outer tether surface to ground the tether at the base flying sheave at typical flying positions; and installation of a shielding band within the outer tether jacket with a weight of about 0.05 lb/ft for a half-inch tether. This determination was made in part by high current tests and in part by electrical modeling.
McCarney, Steve; Robertson, Joanie; Arnaud, Juliette; Lorenson, Kristina; Lloyd, John
2013-12-09
Large areas of many developing countries have no grid electricity. This is a serious challenge that threatens the continuity of the vaccine cold chain. The main alternatives to electrically powered refrigerators available for many years--kerosene- and gas-driven refrigerators--are plagued by problems with gas supply interruptions, low efficiency, poor temperature control, and frequent maintenance needs. There are currently no kerosene- or gas-driven refrigerators that qualify under the minimum standards established by the World Health Organization (WHO) Performance, Quality, and Safety (PQS) system. Solar refrigeration was a promising development in the early 1980s, providing an alternative to absorption technology to meet cold chain needs in remote areas. Devices generally had strong laboratory performance data; however, experience in the field over the years has been mixed. Traditional solar refrigerators relied on relatively expensive battery systems, which have demonstrated short lives compared to the refrigerator. There are now alternatives to the battery-based systems and a clear understanding that solar refrigerator systems need to be designed, installed, and maintained by technicians with the necessary knowledge and training. Thus, the technology is now poised to be the refrigeration method of choice for the cold chain in areas with no electricity or extremely unreliable electricity (less than 4h per average day) and sufficient sunlight. This paper highlights some lessons learned with solar-powered refrigeration, and discusses some critical factors for successful introduction of solar units into immunization programs in the future including: •Sustainable financing mechanisms and incentives for health workers and technicians are in place to support long-term maintenance, repair, and replacement parts. •System design is carried out by qualified solar refrigerator professionals taking into account the conditions at installation sites. •Installation and repair are conducted by well-trained technicians. •Temperature performance is continuously monitored and protocols are in place to act on data that indicate problems. Copyright © 2013 The Authors. Published by Elsevier Ltd.. All rights reserved.
Reliability and economy -- Hydro electricity for Iran
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jahromi-Shirazi, M.J.; Zarbakhsh, M.H.
1998-12-31
Reliability is the probability that a device or system will perform its function adequately, for the period of time intended, under the operating conditions intended. Reliability and economy are two important factors in operating any system, especially in power generation. Due to the high rate in population growth in Iran, the experts have estimated that the demand for electricity will be about 63,000 MW in the next 25 years, the installed power is now about 26,000 MW. Therefore, the energy policy decision made in Iran is to go to power generation by hydroelectric plants because of reliability, availability of watermore » resources and the economics of hydroelectric power.« less
NASA Astrophysics Data System (ADS)
Liu, Junhui; Yang, Jianlian; Wang, Jiangbo; Yang, Meng; Tian, Chunzheng; He, Xinhui
2018-01-01
With grid-connected scale of clean energy such as wind power and photovoltaic power expanding rapidly and cross-province transmission scale being bigger, utilization hours of coal-fired power generation units become lower and lower in the context of the current slowdown in electricity demand. This paper analyzes the influencing factors from the three aspects of demand, supply and supply and demand balance, and the mathematical model has been constructed based on the electric energy balance. The utilization hours of coal-fired power generation units have been solved considering the relationship among proportion of various types of power installed capacity, the output rate and utilization hours. By carrying out empirical research in Henan Province, the utilization hours of coal-fired units of Henan Province in 2020 has been achieved. The example validates the practicability and the rationality of the model, which can provide a basis for the decision-making for coal-fired power generation enterprises.
AGUACLARA: CLEAN WATER FOR SMALL COMMUNITIES
We will systematically evaluate commercially available solar thermal collectors and thermal storage systems for use in residential scale co-generative heat and electrical power systems. Currently, reliable data is unavailable over the range of conditions and installations thes...
Electric Power Systems Are Profoundly Changing | Energy Analysis | NREL
. Advances in efficiency and smart grid technologies also have the potential to change historical demand installations are increasing. NREL works within these currents of change, and helps shape them to enhance our
2000-08-30
Workers rise to the occasion on accordion lifts as they oversee the movement of solar array in front of them. The solar array will be installed onto the Integrated Equipment Assembly (IEA). A component of the International Space Station, the solar array is the second one being installed on the IEA. The arrays are scheduled to be launched on mission STS-97 in late November along with the P6 truss. The Station’s electrical power system (EPS) will use eight photovoltaic solar arrays to convert sunlight to electricity. Each of the eight solar arrays will be 112 feet long by 39 feet wide. The solar arrays are mounted on a “blanket” that can be folded like an accordion for delivery. Once in orbit, astronauts will deploy the blankets to their full size. Gimbals will be used to rotate the arrays so that they will face the Sun to provide maximum power to the Space Station
2000-08-30
An overhead crane in the Space Station Processing Facility lifts a solar array as workers stand by to help guide it. The solar array will be installed onto the Integrated Equipment Assembly (IEA). A component of the International Space Station, the solar array is the second one being installed on the IEA. The arrays are scheduled to be launched on mission STS-97 in late November along with the P6 truss. The Station’s electrical power system (EPS) will use eight photovoltaic solar arrays to convert sunlight to electricity. Each of the eight solar arrays will be 112 feet long by 39 feet wide. The solar arrays are mounted on a “blanket” that can be folded like an accordion for delivery. Once in orbit, astronauts will deploy the blankets to their full size. Gimbals will be used to rotate the arrays so that they will face the Sun to provide maximum power to the Space Station
2000-08-30
The overhead crane carrying a solar array turns on its axis to move the array to the Integrated Equipment Assembly (IEA) for installation. A component of the International Space Station, the solar array is the second one being installed on the IEA. The arrays are scheduled to be launched on mission STS-97 in late November along with the P6 truss. The Station’s electrical power system (EPS) will use eight photovoltaic solar arrays to convert sunlight to electricity. Each of the eight solar arrays will be 112 feet long by 39 feet wide. The solar arrays are mounted on a “blanket” that can be folded like an accordion for delivery. Once in orbit, astronauts will deploy the blankets to their full size. Gimbals will be used to rotate the arrays so that they will face the Sun to provide maximum power to the Space Station
2000-08-30
Workers in the Space Station Processing Facility help guide an overhead crane toward a workstand containing a solar array in order to move it for installation onto the Integrated Equipment Assembly (IEA). A component of the International Space Station, the solar array is the second one being installed on the IEA. The arrays are scheduled to be launched on mission STS-97 in late November along with the P6 truss. The Station’s electrical power system (EPS) will use eight photovoltaic solar arrays to convert sunlight to electricity. Each of the eight solar arrays will be 112 feet long by 39 feet wide. The solar arrays are mounted on a “blanket” that can be folded like an accordion for delivery. Once in orbit, astronauts will deploy the blankets to their full size. Gimbals will be used to rotate the arrays so that they will face the Sun to provide maximum power to the Space Station
Final environmental assessment: Sacramento Energy Service Center
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-03-01
The Sacramento Area Office (SAO) of the Western Area Power Administration (Western) needs to increase the security of operations, to eliminate overcrowding at the current leased location of the existing facilities, to provide for future growth, to improve efficiency, and to reduce operating costs. The proposed action is to construct an approximate 40,000-square foot building and adjacent parking lot with a Solar Powered Electric Vehicle Charging Station installed to promote use of energy efficient transportation. As funding becomes available and technology develops, additional innovative energy-efficient measures will be incorporated into the building. For example the proposed construction of the Solarmore » Powered Electric Vehicle Charging.« less
Analyzing Small Signal Stability of Power System based on Online Data by Use of SMES
NASA Astrophysics Data System (ADS)
Ishikawa, Hiroyuki; Shirai, Yasuyuki; Nitta, Tanzo; Shibata, Katsuhiko
The purpose of this study is to estimate eigen-values and eigen-vectors of a power system from on-line data to evaluate the power system stability. Power system responses due to the small power modulation of known pattern from SMES (Superconducting Magnetic Energy Storage) were analyzed, and the transfer functions between the power modulation and power oscillations of generators were obtained. Eigen-values and eigen-vectors were estimated from the transfer functions. Experiments were carried out by use of a model SMES and Advanced Power System Analyzer (APSA), which is an analogue type power system simulator of Kansai Electric Power Company Inc., Japan. Changes in system condition were observed by the estimated eigen-values and eigen-vectors. Result agreed well with the resent report and digital simulation. This method gives a new application for SMES, which will be installed for improving electric power quality.
A 40-kW fuel cell field test summary utilities activities report
NASA Astrophysics Data System (ADS)
Racine, W. C.; Londos, T. C.
1987-07-01
Forty six 40 kW fuel cell power plants were field tested by 37 host participants at 42 sites in a variety of commercial, light industrial and multifamily residential applications. The participants obtained over 300,000 hours of operating experience with the power plants covering a diverse range of applications for power plant electricity and heat utilization in both single and multiple unit installations.
DoD Installation Energy Security: Evolving to a Smart Grid
2012-03-20
located at the Naval Air Weapons Station in China Lake, California. This series of geothermal power plants produces a peak power output of 270 megawatts...initiatives are driving the DoD to invest significantly in renewable energy resources like solar, wind, and geothermal , as well as energy efficient vehicles...hydroelectric, geothermal ) resources. The most common and largest forms of electrical generation come from power plants that use fossil fuels
Cassini's RTGs undergo mechanical and electrical verification tests in the PHSF
NASA Technical Reports Server (NTRS)
1997-01-01
Lockheed Martin Missile and Space Co. employees Joe Collingwood, at right, and Ken Dickinson retract pins in the storage base to release a radioisotope thermoelectric generator (RTG) in preparation for hoisting operations. This RTG and two others will be installed on the Cassini spacecraft for mechanical and electrical verification testing in the Payload Hazardous Servicing Facility. The RTGs will provide electrical power to Cassini on its 6.7-year trip to the Saturnian system and during its four-year mission at Saturn. RTGs use heat from the natural decay of plutonium to generate electric power. The generators enable spacecraft to operate at great distances from the Sun where solar power systems are not feasible. The Cassini mission is targeted for an Oct. 6 launch aboard a Titan IVB/Centaur expendable launch vehicle. Cassini is built and managed by NASA's Jet Propulsion Laboratory.
1997-07-18
Jet Propulsion Laboratory (JPL) workers use a borescope to verify pressure relief device bellows integrity on a radioisotope thermoelectric generator (RTG) which has been installed on the Cassini spacecraft in the Payload Hazardous Servicing Facility. The activity is part of the mechanical and electrical verification testing of RTGs during prelaunch processing. RTGs use heat from the natural decay of plutonium to generate electric power. The three RTGs on Cassini will enable the spacecraft to operate far from the Sun where solar power systems are not feasible. They will provide electrical power to Cassini on its 6.7-year trip to the Saturnian system and during its four-year mission at Saturn. The Cassini mission is scheduled for an Oct. 6 launch aboard a Titan IVB/Centaur expendable launch vehicle. Cassini is built and managed for NASA by JPL
1997-07-18
Carrying a neutron radiation detector, Fred Sanders (at center), a health physicist with the Jet Propulsion Laboratory (JPL), and other health physics personnel monitor radiation in the Payload Hazardous Servicing Facility after three radioisotope thermoelectric generators (RTGs) were installed on the Cassini spacecraft for mechanical and electrical verification tests. The RTGs will provide electrical power to Cassini on its 6.7-year trip to the Saturnian system and during its four-year mission at Saturn. RTGs use heat from the natural decay of plutonium to generate electric power. The generators enable spacecraft to operate at great distances from the Sun where solar power systems are not feasible. The Cassini mission is targeted for an Oct. 6 launch aboard a Titan IVB/Centaur expendable launch vehicle. Cassini is built and managed by JPL
NASA Astrophysics Data System (ADS)
Ludanov, K. I.
The author proposes a new method for the transformation of solar radiation energy into electric power, which is alternative for photo-transformation. Ukrpatents's positive decisions are obtained for the method and for the installation for its realization. The method includes two phases: concentration of solar radiation by paraboloid mirrors with high potential heat obtaining in the helio receiver and the next heat transformation into electric power in the framework of the thermal cycle "high temperature electrolytic steam decomposition on the components (H2 and O2) + electrochemical generation by the way of the water recombination from H2 and O2 in the low temperature fuel cell". The new method gives the double superiority in comparison with the photo-transformation.
High Voltage Power Transmission for Wind Energy
NASA Astrophysics Data System (ADS)
Kim, Young il
The high wind speeds and wide available area at sea have recently increased the interests on offshore wind farms in the U.S.A. As offshore wind farms become larger and are placed further from the shore, the power transmission to the onshore grid becomes a key feature. Power transmission of the offshore wind farm, in which good wind conditions and a larger installation area than an onshore site are available, requires the use of submarine cable systems. Therefore, an underground power cable system requires unique design and installation challenges not found in the overhead power cable environment. This paper presents analysis about the benefit and drawbacks of three different transmission solutions: HVAC, LCC/VSC HVDC in the grid connecting offshore wind farms and also analyzed the electrical characteristics of underground cables. In particular, loss of HV (High Voltage) subsea power of the transmission cables was evaluated by the Brakelmann's theory, taking into account the distributions of current and temperature.
Translations on Environmental Quality, Number 176
1978-08-21
impurities, which considerably reduces the production areas occupied by purification installations as a result of the compactness of the flotation ...industrial wastes such as [phosphogin], pyrite gas, ash from thermal electric power stations, slag from nonferrous and ferrous metallurgy and wastes
47 CFR 24.243 - The cost-sharing formula.
Code of Federal Regulations, 2014 CFR
2014-10-01
...; monitoring or control equipment; engineering costs (design/path survey); installation; systems testing; FCC... control; power plant upgrade (if required); electrical grounding systems; Heating Ventilation and Air Conditioning (HVAC) (if required); alternate transport equipment; and leased facilities. C also includes...
47 CFR 24.243 - The cost-sharing formula.
Code of Federal Regulations, 2013 CFR
2013-10-01
...; monitoring or control equipment; engineering costs (design/path survey); installation; systems testing; FCC... control; power plant upgrade (if required); electrical grounding systems; Heating Ventilation and Air Conditioning (HVAC) (if required); alternate transport equipment; and leased facilities. C also includes...
47 CFR 24.243 - The cost-sharing formula.
Code of Federal Regulations, 2012 CFR
2012-10-01
...; monitoring or control equipment; engineering costs (design/path survey); installation; systems testing; FCC... control; power plant upgrade (if required); electrical grounding systems; Heating Ventilation and Air Conditioning (HVAC) (if required); alternate transport equipment; and leased facilities. C also includes...
47 CFR 24.243 - The cost-sharing formula.
Code of Federal Regulations, 2011 CFR
2011-10-01
...; monitoring or control equipment; engineering costs (design/path survey); installation; systems testing; FCC... control; power plant upgrade (if required); electrical grounding systems; Heating Ventilation and Air Conditioning (HVAC) (if required); alternate transport equipment; and leased facilities. C also includes...
ERIC Educational Resources Information Center
Musgrove, P.
1978-01-01
Explores the possibility of installing offshore windmills to provide electricity and to save fuel for the United Kingdom. Favors their deployment in clusters to facilitate supervision and minimize cost. Discusses the power output and the cost involved and urges their quick development. (GA)
NASA Astrophysics Data System (ADS)
Aminov, R. Z.; Shkret, A. F.; Garievskii, M. V.
2016-08-01
The use of potent power units in thermal and nuclear power plants in order to regulate the loads results in intense wear of power generating equipment and reduction in cost efficiency of their operation. We review the methodology of a quantitative assessment of the lifespan and wear of steam-turbine power units and estimate the effect of various operation regimes upon their efficiency. To assess the power units' equipment wear, we suggest using the concept of a turbine's equivalent lifespan. We give calculation formulae and an example of calculation of the lifespan of a steam-turbine power unit for supercritical parameters of steam for different options of its loading. The equivalent lifespan exceeds the turbine's assigned lifespan only provided daily shutdown of the power unit during the night off-peak time. We obtained the engineering and economical indices of the power unit operation for different loading regulation options in daily and weekly diagrams. We proved the change in the prime cost of electric power depending on the operation regimes and annual daily number of unloading (non-use) of the power unit's installed capacity. According to the calculation results, the prime cost of electric power for the assumed initial data varies from 11.3 cents/(kW h) in the basic regime of power unit operation (with an equivalent operation time of 166700 hours) to 15.5 cents/(kW h) in the regime with night and holiday shutdowns. The reduction of using the installed capacity of power unit at varying regimes from 3.5 to 11.9 hours per day can increase the prime cost of energy from 4.2 to 37.4%. Furthermore, repair and maintenance costs grow by 4.5% and by 3 times, respectively, in comparison with the basic regime. These results indicate the need to create special maneuverable equipment for working in the varying section of the electric load diagram.
NASA Astrophysics Data System (ADS)
Shimada, Takae; Kawasaki, Norihiro; Ueda, Yuzuru; Sugihara, Hiroyuki; Kurokawa, Kosuke
This paper aims to clarify the battery capacity required by a residential area with densely grid-connected photovoltaic (PV) systems. This paper proposes a planning method of tomorrow's grid-connection power from/to the external electric power system by using demand power forecasting and insolation forecasting for PV power predictions, and defines a operation method of the electricity storage device to control the grid-connection power as planned. A residential area consisting of 389 houses consuming 2390 MWh/year of electricity with 2390kW PV systems is simulated based on measured data and actual forecasts. The simulation results show that 8.3MWh of battery capacity is required in the conditions of half-hour planning and 1% or less of planning error ratio and PV output limiting loss ratio. The results also show that existing technologies of forecasting reduce required battery capacity to 49%, and increase the allowable installing PV amount to 210%.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wicks, F.
1998-07-01
The need to produce electricity either more fuel efficiently or without need for consuming fuel is well recognized. Fuel cells are typically suggested for higher efficiency and photovoltaics can produce electricity directly from the sun. However, both of these devices produce direct current which is not compatible with the existing ac power system. The typical options of installing AC to DC inverters and the dedication of this DC generation to DC loads and storage are costly and inefficient. Thus, the author suggests it would be better in terms of energy conservation and public policy to convert end use service tomore » DC for direct compatibility with this DC generation, as a first step toward conversion to a new and better type of electric power system that can be described as a solid state power electronics based multiple voltage DC power system.« less
Modelling of the Installed Capacity of Landfill Power Stations
NASA Astrophysics Data System (ADS)
Blumberga, D.; Kuplais, Ģ.; Veidenbergs, I.; Dāce, E.; Gušča, J.
2009-01-01
More and more landfills are being developed, in which biogas is produced and accumulated, which can be used for electricity production. Currently, due to technological reasons, electricity generation from biogas has a very low level of efficiency. In order to develop this type of energy production, it is important to find answers to various engineering, economic and ecological issues. The paper outlines the results obtained by creating a model for the calculations of electricity production in landfill power stations and by testing it in the municipal solid waste landfill "Daibe". The algorithm of the mathematical model for the operation of a biogas power station consists of four main modules: • initial data module, • engineering calculation module, • tariff calculation module, and • climate calculation module. As a result, the optimum capacity of the power station in the landfill "Daibe" is determined, as well as the analysis of the landfill's economic data and cost-effectiveness is conducted.
NASA Astrophysics Data System (ADS)
Farhadzadeh, E. M.; Muradaliyev, A. Z.; Farzaliyev, Y. Z.
2015-10-01
A method and an algorithm of ranking of boiler installations based on their technical and economic indicators are proposed. One of the basic conditions for ranking is the independence of technical and economic indicators. The assessment of their interrelation was carried out with respect to the correlation rate. The analysis of calculation data has shown that the interrelation stability with respect to the value and sign persists only for those indicators that have an evident relationship between each other. One of the calculation steps is the normalization of quantitative estimates of technical and economic indicators, which makes it possible to eliminate differences in dimensions and indicator units. The analysis of the known methods of normalization has allowed one to recommend the relative deviation from the average value as a normalized value and to use the arithmetic mean of the normalized values of independent indicators of each boiler installation as an integrated index of performance reliability and profitability. The fundamental differences from the existing approach to assess the "weak components" of a boiler installation and the quality of monitoring of its operating regimes are that the given approach takes into account the reliability and profitability of the operation of all other analogous boiler installations of an electric power station; it also implements competing elements with respect to the quality of control among the operating personnel of separate boiler installations and is aimed at encouraging an increased quality of maintenance and repairs.
NASA Astrophysics Data System (ADS)
Palivos, Marios; Vokas, Georgios A.; Anastasiadis, Anestis; Papageorgas, Panagiotis; Salame, Chafic
2018-05-01
One of the major energy issues of our days is reliable and effective energy generation and supply of electricity grids. In recent years there has been experienced a rapid development and implementation of Renewable Energy Sources (RES) worldwide. On one hand, many Gigawatts of grid-connected renewables are being installed and on the other many Megawatts of hybrid renewable systems for residential use are being installed making use of electric battery systems, in order to cover all daily energy and power needs during. New types of batteries are being developed and many companies have made great progress providing a variety of electricity storage products. The purpose of this research is firstly to highlight the necessity and also the importance of the use of energy storage systems and secondly, through detailed technical and financial simulation analysis using HOMER Pro-optimization software, to compare the technical characteristics and performance of energy storage systems by various leading companies when installed in a residential renewable energy system with a specific load and at the same time to provide the most efficient system economically. Results concerning the operation and the choice of a storage system are derived.
Dynamic Modeling and Grid Interaction of a Tidal and River Generator
DOE Office of Scientific and Technical Information (OSTI.GOV)
Muljadi, Eduard; Gevorgian, Vahan; Donegan, James
This presentation provides a high-level overview of the deployment of a river generator installed in a small system. The turbine dynamics of a river generator, electrical generator, and power converter are modeled in detail. Various simulations can be exercised, and the impact of different control algorithms, failures of power switches, and corresponding impacts can be examined.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1989-11-28
The testimony concerns the support of NIOSH for the OSHA proposed rule on Electric Power Generation, Transmission and Distribution. NIOSH in particular comments on control of hazardous energy, cardiopulmonary resuscitation, line mechanics, and enclosed spaces. NIOSH estimates that 80 to 90% of the fatalities occurring in the industry occur among line mechanics. NIOSH strongly supports OSHA in applying the standard both electric utility companies and to power generation, transmission and distribution installations not under control of electric utilities. In addition to evaluating electrocutions to find effective ways for workers to avoid electrical injury or fatality, NIOSH has published recommendations formore » providing emergency medical care when workers do inadvertently contact electrical energy. NIOSH is not aware of any epidemiologic study which collected sufficient data to directly address the issue of successful resuscitation following contact with electrical energy. A review of pertinent epidemiologic studies and standard medical practice supports the NIOSH recommendation that workers who may contact energized electrical circuit work in pairs and that both members of the team be trained in cardiopulmonary resuscitation.« less
Vehicle to grid: electric vehicles as an energy storage solution
NASA Astrophysics Data System (ADS)
McGee, Rodney; Waite, Nicholas; Wells, Nicole; Kiamilev, Fouad E.; Kempton, Willett M.
2013-05-01
With increased focus on intermittent renewable energy sources such as wind turbines and photovoltaics, there comes a rising need for large-scale energy storage. The vehicle to grid (V2G) project seeks to meet this need using electric vehicles, whose high power capacity and existing power electronics make them a promising energy storage solution. This paper will describe a charging system designed by the V2G team that facilitates selective charging and backfeeding by electric vehicles. The system consists of a custom circuit board attached to an embedded linux computer that is installed both in the EVSE (electric vehicle supply equipment) and in the power electronics unit of the vehicle. The boards establish an in-band communication link between the EVSE and the vehicle, giving the vehicle internet connectivity and the ability to make intelligent decisions about when to charge and discharge. This is done while maintaining compliance with existing charging protocols (SAEJ1772, IEC62196) and compatibility with standard "nonintelligent" cars and chargers. Through this system, the vehicles in a test fleet have been able to successfully serve as portable temporary grid storage, which has implications for regulating the electrical grid, providing emergency power, or supplying power to forward military bases.
47 CFR 27.1164 - The cost-sharing formula.
Code of Federal Regulations, 2013 CFR
2013-10-01
...); installation; systems testing; FCC filing costs; site acquisition and civil works; zoning costs; training... upgrades for interference control; power plant upgrade (if required); electrical grounding systems; Heating Ventilation and Air Conditioning (HVAC) (if required); alternate transport equipment; and leased facilities...
46 CFR 182.410 - General requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
...) MACHINERY INSTALLATION Specific Machinery Requirements § 182.410 General requirements. (a) Starting motors.... Electrical equipment in spaces, compartments, or enclosures that contain machinery powered by, or fuel tanks... gauges must be readily visible at the operating station. (c) An enclosed space containing machinery...
46 CFR 182.410 - General requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
...) MACHINERY INSTALLATION Specific Machinery Requirements § 182.410 General requirements. (a) Starting motors.... Electrical equipment in spaces, compartments, or enclosures that contain machinery powered by, or fuel tanks... gauges must be readily visible at the operating station. (c) An enclosed space containing machinery...
46 CFR 182.410 - General requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
...) MACHINERY INSTALLATION Specific Machinery Requirements § 182.410 General requirements. (a) Starting motors.... Electrical equipment in spaces, compartments, or enclosures that contain machinery powered by, or fuel tanks... gauges must be readily visible at the operating station. (c) An enclosed space containing machinery...
46 CFR 182.410 - General requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
...) MACHINERY INSTALLATION Specific Machinery Requirements § 182.410 General requirements. (a) Starting motors.... Electrical equipment in spaces, compartments, or enclosures that contain machinery powered by, or fuel tanks... gauges must be readily visible at the operating station. (c) An enclosed space containing machinery...
46 CFR 182.410 - General requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
...) MACHINERY INSTALLATION Specific Machinery Requirements § 182.410 General requirements. (a) Starting motors.... Electrical equipment in spaces, compartments, or enclosures that contain machinery powered by, or fuel tanks... gauges must be readily visible at the operating station. (c) An enclosed space containing machinery...
Electric power quarterly: January-March 1988. [Contains glossary
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1988-07-22
The Electric Power Quarterly (EPQ) presents information on electric utilities at the plant level. The information provides the following: cost, quantity, and quality of fossil fuel receipts; net generation; fuel consumption; and fuel stocks. The EPQ contains monthly data and quarterly totals for the reporting quarter. These data are published to provide meaningful, timely, objective, and accurate energy information for a wide audience including Congress, federal, and state agencies; industry; and the general public. In this report, data regarding electric utilities' net generation, fuel consumption, and fuel stocks are presented on a plant-by-plant basis. In addition, quantity, cost, and qualitymore » of fossil-fuel receipts are presented on a plant-by-plant basis for plants with a combined installed nameplate capacity of 50 megawatts or larger.« less
Photovoltaic stand-alone modular systems, phase 2
NASA Technical Reports Server (NTRS)
Naff, G. J.; Marshall, N. A.
1983-01-01
The final hardware and system qualification phase of a two part stand-alone photovoltaic (PV) system development is covered. The final design incorporated modular, power blocks capable of expanding incrementally from 320 watts to twenty kilowatts (PK). The basic power unit (PU) was nominally rated 1.28 kWp. The controls units, power collection buses and main lugs, electrical protection subsystems, power switching, and load management circuits are housed in a common control enclosure. Photo-voltaic modules are electrically connected in a horizontal daisy-chain method via Amp Solarlok plugs mating with compatible connectors installed on the back side of each photovoltaic module. A pair of channel rails accommodate the mounting of the modules into a frameless panel support structure. Foundations are of a unique planter (tub-like) configuration to allow for world-wide deployment without restriction as to types of soil. One battery string capable of supplying approximately 240 ampere hours nominal of carryover power is specified for each basic power unit. Load prioritization and shedding circuits are included to protect critical loads and selectively shed and defer lower priority or noncritical power demands. The baseline system, operating at approximately 2 1/2 PUs (3.2 kW pk.) was installed and deployed. Qualification was successfully complete in March 1983; since that time, the demonstration system has logged approximately 3000 hours of continuous operation under load without major incident.
Photovoltaic stand-alone modular systems, phase 2
NASA Astrophysics Data System (ADS)
Naff, G. J.; Marshall, N. A.
1983-07-01
The final hardware and system qualification phase of a two part stand-alone photovoltaic (PV) system development is covered. The final design incorporated modular, power blocks capable of expanding incrementally from 320 watts to twenty kilowatts (PK). The basic power unit (PU) was nominally rated 1.28 kWp. The controls units, power collection buses and main lugs, electrical protection subsystems, power switching, and load management circuits are housed in a common control enclosure. Photo-voltaic modules are electrically connected in a horizontal daisy-chain method via Amp Solarlok plugs mating with compatible connectors installed on the back side of each photovoltaic module. A pair of channel rails accommodate the mounting of the modules into a frameless panel support structure. Foundations are of a unique planter (tub-like) configuration to allow for world-wide deployment without restriction as to types of soil. One battery string capable of supplying approximately 240 ampere hours nominal of carryover power is specified for each basic power unit. Load prioritization and shedding circuits are included to protect critical loads and selectively shed and defer lower priority or noncritical power demands. The baseline system, operating at approximately 2 1/2 PUs (3.2 kW pk.) was installed and deployed. Qualification was successfully complete in March 1983; since that time, the demonstration system has logged approximately 3000 hours of continuous operation under load without major incident.
NASA Astrophysics Data System (ADS)
Erkaya, Yunus
The number of solar photovoltaic (PV) installations is growing exponentially, and to improve the energy yield and the efficiency of PV systems, it is necessary to have correct methods for simulation, measurement, and emulation. PV systems can be simulated using PV models for different configurations and technologies of PV modules. Additionally, different environmental conditions of solar irradiance, temperature, and partial shading can be incorporated in the model to accurately simulate PV systems for any given condition. The electrical measurement of PV systems both prior to and after making electrical connections is important for attaining high efficiency and reliability. Measuring PV modules using a current-voltage (I-V) curve tracer allows the installer to know whether the PV modules are 100% operational. The installed modules can be properly matched to maximize performance. Once installed, the whole system needs to be characterized similarly to detect mismatches, partial shading, or installation damage before energizing the system. This will prevent any reliability issues from the onset and ensure the system efficiency will remain high. A capacitive load is implemented in making I-V curve measurements with the goal of minimizing the curve tracer volume and cost. Additionally, the increase of measurement resolution and accuracy is possible via the use of accurate voltage and current measurement methods and accurate PV models to translate the curves to standard testing conditions. A move from mechanical relays to solid-state MOSFETs improved system reliability while significantly reducing device volume and costs. Finally, emulating PV modules is necessary for testing electrical components of a PV system. PV emulation simplifies and standardizes the tests allowing for different irradiance, temperature and partial shading levels to be easily tested. Proper emulation of PV modules requires an accurate and mathematically simple PV model that incorporates all known system variables so that any PV module can be emulated as the design requires. A non-synchronous buck converter is proposed for the emulation of a single, high-power PV module using traditional silicon devices. With the proof-of-concept working and improvements in efficiency, power density and steady-state errors made, dynamic tests were performed using an inverter connected to the PV emulator. In order to improve the dynamic characteristics, a synchronous buck converter topology is proposed along with the use of advanced GaNFET devices which resulted in very high power efficiency and improved dynamic response characteristics when emulating PV modules.
Structures and construction of nuclear power plants on lunar surface
NASA Astrophysics Data System (ADS)
Shimizu, Katsunori; Kobatake, Masuhiko; Ogawa, Sachio; Kanamori, Hiroshi; Okada, Yasuhiko; Mano, Hideyuki; Takagi, Kenji
1991-07-01
The best structure and construction techniques of nuclear power plants in the severe environments on the lunar surface are studied. Facility construction types (functional conditions such as stable structure, shield thickness, maintainability, safety distances, and service life), construction conditions (such as construction methods, construction equipment, number of personnel, time required for construction, external power supply, and required transportation) and construction feasibility (construction method, reactor transportation between the moon and the earth, ground excavation for installation, loading and unloading, transportation, and installation, filling up the ground, electric power supply of plant S (300 kW class) and plant L (3000 kW class)) are outlined. Items to pay attention to in construction are (1) automation and robotization of construction; (2) cost reduction by multi functional robots; and (3) methods of supplying power to robots. A precast concrete block manufacturing plant is also outlined.
Monitoring of the electrical parameters in off-grid solar power system
NASA Astrophysics Data System (ADS)
Idzkowski, Adam; Leoniuk, Katarzyna; Walendziuk, Wojciech
2016-09-01
The aim of this work was to make a monitoring dedicated to an off-grid installation. A laboratory set, which was built for that purpose, was equipped with a PV panel, a battery, a charge controller and a load. Additionally, to monitor electrical parameters from this installation there were used: LabJack module (data acquisition card), measuring module (self-built) and a computer with a program, which allows to measure and present the off-grid installation parameters. The program was made in G language using LabVIEW software. The designed system enables analyzing the currents and voltages of PV panel, battery and load. It makes also possible to visualize them on charts and to make reports from registered data. The monitoring system was also verified by a laboratory test and in real conditions. The results of this verification are also presented.
Supply and Demand Control of Distributed Generators in a Microgrid for New Energy
NASA Astrophysics Data System (ADS)
Shimakage, Toyonari; Sumita, Jiro; Uchiyama, Noriyuki; Kato, Takeyoshi; Suzuoki, Yasuo
We report the operational results of distributed generators (DGs) in a microgrid and present the effects after incorporating photovoltaic power generation (PV) systems into the microgrid for electric power system. The microgrid was constructed at the EXPO 2005 Aichi site as part of a demonstration promoted by NEDO. A solution is needed to problems where instability in the DGs that utilize natural energy such as solar light and wind force negatively influence existing electric power systems. So, we developed energy control system and controlled DGs output to reduce the fluctuation at the grid connected point caused by PV system's instability output. Our microgrid consists of DGs such as PV systems, fuel cells, and NaS batteries, and these DGs are controlled by an energy control system. We verified practical effectiveness of the installing the microgrid as follows. (1) 99.5% of the power imbalance in the supply and demand over 30 minutes was within a range of ±3% under normal operating conditions, (2) the microgrid contributes to the load leveling, (3) energy control system smoothes the power flow fluctuation of PV system output at the grid connected point, (4) in the future, installing a microgrid will help reduce the additional LFC (Load Frequency Control) capacity.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dillon, Heather E.; Colella, Whitney G.
2015-06-01
Pacific Northwest National Laboratory (PNNL) is working with industry to independently monitor up to 15 distinct 5 kW-electric (kWe) combined heat and power (CHP) high temperature (HT) proton exchange membrane (PEM) fuel cell systems (FCSs) installed in light commercial buildings. This research paper discusses an evaluation of the first six months of measured performance data acquired at a 1 s sampling rate from real-time monitoring equipment attached to the FCSs at building sites. Engineering performance parameters are independently evaluated. Based on an analysis of the first few months of measured operating data, FCS performance is consistent with manufacturer-stated performance. Initialmore » data indicate that the FCSs have relatively stable performance and a long-term average production of about 4.57 kWe of power. This value is consistent with, but slightly below, the manufacturer's stated rated electric power output of 5 kWe. The measured system net electric efficiency has averaged 33.7%, based on the higher heating value (HHV) of natural gas fuel. This value, also, is consistent with, but slightly below, the manufacturer's stated rated electric efficiency of 36%. The FCSs provide low-grade hot water to the building at a measured average temperature of about 48.4 degrees C, lower than the manufacturer's stated maximum hot water delivery temperature of 65 degrees C. The uptime of the systems is also evaluated. System availability can be defined as the quotient of total operating time compared to time since commissioning. The average values for system availability vary between 96.1 and 97.3%, depending on the FCS evaluated in the field. Performance at rated value for electrical efficiency (PRVeff) can be defined as the quotient of the system time operating at or above the rated electric efficiency and the time since commissioning. The PRVeff varies between 5.6% and 31.6%, depending on the FCS field unit evaluated. Performance at rated value for electrical power (PRVp) can be defined as the quotient of the system time operating at or above the rated electric power and the time since commissioning. PRVp varies between 6.5% and 16.2%. Performance at rated value for electrical efficiency and power (PRVt) can be defined as the quotient of the system time operating at or above both the rated electric efficiency and the electric power output compared to the time since commissioning. PRVt varies between 0.2% and 1.4%. Optimization to determine the manufacturer rating required to achieve PRVt greater than 80% has been performed based on the collected data. For example, for FCS Unit 130 to achieve a PRVt of 95%, it would have to be down-rated to an electrical power output of 3.2 kWe and an electrical efficiency of 29%. The use of PRV as an assessment metric for FCSs has been developed and reported for the first time in this paper. For FCS Unit 130, a maximum decline in electric power output of approximately 18% was observed over a 500 h period in Jan. 2012.« less
1997-07-19
Lockheed Martin Missile and Space Co. employees Joe Collingwood, at right, and Ken Dickinson retract pins in the storage base to release a radioisotope thermoelectric generator (RTG) in preparation for hoisting operations. This RTG and two others will be installed on the Cassini spacecraft for mechanical and electrical verification testing in the Payload Hazardous Servicing Facility. The RTGs will provide electrical power to Cassini on its 6.7-year trip to the Saturnian system and during its four-year mission at Saturn. RTGs use heat from the natural decay of plutonium to generate electric power. The generators enable spacecraft to operate at great distances from the Sun where solar power systems are not feasible. The Cassini mission is targeted for an Oct. 6 launch aboard a Titan IVB/Centaur expendable launch vehicle. Cassini is built and managed by NASA’s Jet Propulsion Laboratory
1997-07-19
Supported on a lift fixture, this radioisotope thermoelectric generator (RTG), at center, is hoisted from its storage base using the airlock crane in the Payload Hazardous Servicing Facility (PHSF). Jet Propulsion Laboratory (JPL) workers are preparing to install the RTG onto the Cassini spacecraft, in background at left, for mechanical and electrical verification testing. The three RTGs on Cassini will provide electrical power to the spacecraft on its 6.7-year trip to the Saturnian system and during its four-year mission at Saturn. RTGs use heat from the natural decay of plutonium to generate electric power. The generators enable spacecraft to operate at great distances from the Sun where solar power systems are not feasible. The Cassini mission is targeted for an Oct. 6 launch aboard a Titan IVB/Centaur expendable launch vehicle. Cassini is built and managed by JPL
ARPA-E: Advancing the Electric Grid
Lemmon, John; Ruiz, Pablo; Sommerer, Tim; Aziz, Michael
2018-06-07
The electric grid was designed with the assumption that all energy generation sources would be relatively controllable, and grid operators would always be able to predict when and where those sources would be located. With the addition of renewable energy sources like wind and solar, which can be installed faster than traditional generation technologies, this is no longer the case. Furthermore, the fact that renewable energy sources are imperfectly predictable means that the grid has to adapt in real-time to changing patterns of power flow. We need a dynamic grid that is far more flexible. This video highlights three ARPA-E-funded approaches to improving the grid's flexibility: topology control software from Boston University that optimizes power flow, gas tube switches from General Electric that provide efficient power conversion, and flow batteries from Harvard University that offer grid-scale energy storage.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1978-05-01
A profile of Potomac Electric Power Co. executive Ellis T. Cox EPRI Advisory Board member the obligation he feels for preserving the unique qualities of the Washington, D.C. area by installing power plant pollution equipment, burning low-sulfur coal, and setting an example of concern for other companies and the legislators. Cox feels a commitment to not only meet civic responsibilities, but to demonstrate that an efficient, cost-effective company can also protect the environment. He sets long-term fuel supplies as a high priority for utility research and development and sees no alternative to shifts away from petroleum and further development ofmore » nuclear generating power. His other concerns are for streamlining the regulatory process, demonstrating the Civex process as an alternative fuel cycle, and a continuation of the joint efforts of utilities and the Electric Power Research Institute to solve practical problems of pollution control and develop new fuels and new combustion technologies.« less
NASA Astrophysics Data System (ADS)
Rodríguez, A.; Astrain, D.; Martínez, A.; Aranguren, P.
2014-06-01
In the work discussed in this paper a thermoelectric generator was developed to harness waste heat from the exhaust gas of a boiler in a biomass power plant and thus generate electric power to operate a flowmeter installed in the chimney, to make it autonomous. The main objective was to conduct an experimental study to optimize a previous design obtained after computational work based on a simulation model for thermoelectric generators. First, several places inside and outside the chimney were considered as sites for the thermoelectricity-driven autonomous sensor. Second, the thermoelectric generator was built and tested to assess the effect of the cold-side heat exchanger on the electric power, power consumption by the flowmeter, and transmission frequency. These tests provided the best configuration for the heat exchanger, which met the transmission requirements for different working conditions. The final design is able to transmit every second and requires neither batteries nor electric wires. It is a promising application in the field of thermoelectric generation.
46 CFR 129.360 - Semiconductor-rectifier systems.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Semiconductor-rectifier systems. 129.360 Section 129.360 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.360 Semiconductor-rectifier systems. (a) Each...
46 CFR 129.360 - Semiconductor-rectifier systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Semiconductor-rectifier systems. 129.360 Section 129.360 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.360 Semiconductor-rectifier systems. (a) Each...
46 CFR 129.370 - Equipment grounding.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Equipment grounding. 129.370 Section 129.370 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.370 Equipment grounding. (a) On a metallic vessel...
46 CFR 129.370 - Equipment grounding.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Equipment grounding. 129.370 Section 129.370 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.370 Equipment grounding. (a) On a metallic vessel...
46 CFR 129.360 - Semiconductor-rectifier systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Semiconductor-rectifier systems. 129.360 Section 129.360 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.360 Semiconductor-rectifier systems. (a) Each...
46 CFR 129.370 - Equipment grounding.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Equipment grounding. 129.370 Section 129.370 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.370 Equipment grounding. (a) On a metallic vessel...
46 CFR 111.35-1 - Electrical propulsion installations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Electrical propulsion installations. 111.35-1 Section... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Propulsion § 111.35-1 Electrical propulsion installations. Each electric propulsion installation must meet sections 4-8-5/5.5, 4-8-5/5.11, 4-8-5/5.13, 4-8-5/5.17...
46 CFR 111.35-1 - Electrical propulsion installations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Electrical propulsion installations. 111.35-1 Section... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Propulsion § 111.35-1 Electrical propulsion installations. Each electric propulsion installation must meet sections 4-8-5/5.5, 4-8-5/5.11, 4-8-5/5.13, 4-8-5/5.17...
46 CFR 111.35-1 - Electrical propulsion installations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Electrical propulsion installations. 111.35-1 Section... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Propulsion § 111.35-1 Electrical propulsion installations. Each electric propulsion installation must meet sections 4-8-5/5.5, 4-8-5/5.11, 4-8-5/5.13, 4-8-5/5.17...
46 CFR 111.35-1 - Electrical propulsion installations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Electrical propulsion installations. 111.35-1 Section... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Propulsion § 111.35-1 Electrical propulsion installations. Each electric propulsion installation must meet sections 4-8-5/5.5, 4-8-5/5.11, 4-8-5/5.13, 4-8-5/5.17...
46 CFR 111.35-1 - Electrical propulsion installations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Electrical propulsion installations. 111.35-1 Section... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Propulsion § 111.35-1 Electrical propulsion installations. Each electric propulsion installation must meet sections 4-8-5/5.5, 4-8-5/5.11, 4-8-5/5.13, 4-8-5/5.17...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mousavian, Seyedamirabbas; Valenzuela, Jorge; Wang, Jianhui
2015-02-01
Ensuring the reliability of an electrical power system requires a wide-area monitoring and full observability of the state variables. Phasor measurement units (PMUs) collect in real time synchronized phasors of voltages and currents which are used for the observability of the power grid. Due to the considerable cost of installing PMUs, it is not possible to equip all buses with PMUs. In this paper, we propose an integer linear programming model to determine the optimal PMU placement plan in two investment phases. In the first phase, PMUs are installed to achieve full observability of the power grid whereas additional PMUsmore » are installed in the second phase to guarantee the N - 1 observability of the power grid. The proposed model also accounts for transmission switching and single contingencies such as failure of a PMU or a transmission line. Results are provided on several IEEE test systems which show that our proposed approach is a promising enhancement to the methods available for the optimal placement of PMUs.« less
NASA Astrophysics Data System (ADS)
Shishido, Seiji; Takahashi, Rion; Murata, Toshiaki; Tamura, Junji; Sugimasa, Masatoshi; Komura, Akiyoshi; Futami, Motoo; Ichinose, Masaya; Ide, Kazumasa
The spread of wind power generation is progressed hugely in recent years from a viewpoint of environmental problems including global warming. Though wind power is considered as a very prospective energy source, wind power fluctuation due to the random fluctuation of wind speed has still created some problems. Therefore, research has been performed how to smooth the wind power fluctuation. This paper proposes Energy Capacitor System (ECS) for the smoothing of wind power which consists of Electric Double-Layer Capacitor (EDLC) and power electronics devices and works as an electric power storage system. Moreover, hydrogen has received much attention in recent years from a viewpoint of exhaustion problem of fossil fuel. Therefore it is also proposed that a hydrogen generator is installed at the wind farm to generate hydrogen. In this paper, the effectiveness of the proposed system is verified by the simulation analyses using PSCAD/EMTDC.
Advanced underground Vehicle Power and Control: The locomotive Research Platform
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vehicle Projects LLC
2003-01-28
Develop a fuelcell mine locomotive with metal-hydride hydrogen storage. Test the locomotive for fundamental limitations preventing successful commercialization of hydride fuelcells in underground mining. During Phase 1 of the DOE-EERE sponsored project, FPI and its partner SNL, completed work on the development of a 14.4 kW fuelcell power plant and metal-hydride energy storage. An existing battery-electric locomotive with similar power requirements, minus the battery module, was used as the base vehicle. In March 2001, Atlas Copco Wagner of Portland, OR, installed the fuelcell power plant into the base vehicle and initiated integration of the system into the vehicle. The entiremore » vehicle returned to Sandia in May 2001 for further development and integration. Initial system power-up took place in December 2001. A revision to the original contract, Phase 2, at the request of DOE Golden Field Office, established Vehicle Projects LLC as the new prime contractor,. Phase 2 allowed industry partners to conduct surface tests, incorporate enhancements to the original design by SNL, perform an extensive risk and safety analysis, and test the fuelcell locomotive underground under representative production mine conditions. During the surface tests one of the fuelcell stacks exhibited reduced power output resulting in having to replace both fuelcell stacks. The new stacks were manufactured with new and improved technology resulting in an increase of the gross power output from 14.4 kW to 17 kW. Further work by CANMET and Hatch Associates, an engineering consulting firm specializing in safety analysis for the mining industry, both under subcontract to Vehicle Projects LLC, established minimum requirements for underground testing. CANMET upgraded the Programmable Logic Control (PLC) software used to monitor and control the fuelcell power plant, taking into account locomotive operator's needs. Battery Electric, a South Africa manufacturer, designed and manufactured (at no cost to the project) a new motor controller capable of operating the higher rpm motor and different power characteristics of the fuelcells. In early August 2002, CANMET, with the technical assistance of Nuvera Fuel Cells and Battery Electric, installed the new PLC software, installed the new motor controller, and installed the new fuelcell stacks. After minor adjustments, the fuelcell locomotive pulled its first fully loaded ore cars on a surface track. The fuelcell-powered locomotive easily matched the battery powered equivalent in its ability to pull tonnage and equaled the battery-powered locomotive in acceleration. The final task of Phase 2, testing the locomotive underground in a production environment, occurred in early October 2002 in a gold mine. All regulatory requirements to allow the locomotive underground were completed and signed off by Hatch Associates prior to going underground. During the production tests, the locomotive performed flawlessly with no failures or downtime. The actual tests occurred during a 2-week period and involved moving both gold ore and waste rock over a 1,000 meter track. Refueling, or recharging, of the metal-hydride storage took place on the surface. After each shift, the metal-hydride storage module was removed from the locomotive, transported to surface, and filled with hydrogen from high-pressure tanks. The beginning of each shift started with taking the fully recharged metal-hydride storage module down into the mine and re-installing it onto the locomotive. Each 8 hour shift consumed approximately one half to two thirds of the onboard hydrogen. This indicates that the fuelcell-powered locomotive can work longer than a similar battery-powered locomotive, which operates about 6 hours, before needing a recharge.« less
2000-09-18
Technician Marshall MacCready carefully lays a panel of solar cells into place on a wing section of the Helios Prototype flying wing at AeroVironment's Design Development Center in Simi Valley, California. The bi-facial cells, manufactured by SunPower, Inc., of Sunnyvale, California, are among 64,000 solar cells which have been installed on the solar-powered aircraft to provide electricity to its 14 motors and operating systems.
2000-09-18
Technician Marshall MacCready carefully lays a panel of solar cells into place on a wing section of the Helios Prototype flying wing at AeroVironment's Design Development Center in Simi Valley, California. More than 1,800 panels containing some 64,000 bi-facial cells, fabricated by SunPower, Inc., of Sunnyvale, California, have been installed on the solar-powered aircraft to provide electricity to its 14 motors and operating systems.
Electric power from sugar cane in Costa Rica. A technical and economic analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tugwell, F.; Gowen, M.; Kenda, W.
1988-07-01
A team of specialists visited Costa Rica in May 1988 to analyze the potential for production and sale of electricity by the sugar-cane industry. Focusing on three sugar mills, the team made technical projections at four levels of investment, ranging from the simplest sale of surplus power to the installation of new turbogenerator systems. For each level, capital costs, electricity production and sales, and fuel options were estimated. Associated risks were assessed through sensitivity analyses to demonstrate the possible impacts of varying interest rates, fuel costs, and electricity sales prices. The team concluded that production and sale of electricity formore » the national grid could be an excellent investment opportunity for the sugar industry and would provide important economic benefits, including creation of additional jobs in rural areas, diversification of the sugar industry, and (in the short term) displacement of the need for imported fuels.« less
NASA Astrophysics Data System (ADS)
Kahl, Annelen; Nguyen, Viet-Anh; Bartlett, Stuart; Sossan, Fabrizio; Lehning, Michael
2016-04-01
For a successful distribution strategy of PV installations, it does not suffice to choose the locations with highest annual total irradiance. Attention needs to be given to spatial correlation patterns of insolation to avoid large system-wide variations, which can cause extended deficits in supply or might even damage the electrical network. One alternative goal instead is to seek configurations that provide the smoothest energy production, with the most reliable and predictable supply. Our work investigates several scenarios, each pursuing a different strategy for a future renewable Switzerland without nuclear power. Based on an estimate for necessary installed capacity for solar power [Bartlett, 2015] we first use heuristics to pre-select realistic placements for PV installations. Then we apply optimization methods to find a subset of locations that provides the best possible combined electricity production. For the first part of the selection process, we use a DEM to exclude high elevation zones which would be difficult to access and which are prone to natural hazards. Then we use land surface cover information to find all zones with potential roof area, deemed suitable for installation of solar panels. The optimization employs Principal Component Analysis of satellite derived irradiance data (Surface Incoming Shortwave Radiation (SIS), based on Meteosat Second Generation sensors) to incorporate a spatial aspect into the selection process that does not simply maximize annual total production but rather provides the most robust supply, by combining regions with anti-correlated cloud cover patterns. Depending on the initial assumptions and constraints, the resulting distribution schemes for PV installations vary with respect to required surface area, annual total and lowest short-term production, and illustrate how important it is to clearly define priorities and policies for a future renewable Switzerland.
29 CFR 1910.306 - Specific purpose equipment and installations.
Code of Federal Regulations, 2014 CFR
2014-07-01
... and multicar installations. On single-car and multicar installations, equipment receiving electrical... ADMINISTRATION, DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH STANDARDS Electrical Design Safety Standards for Electrical Systems § 1910.306 Specific purpose equipment and installations. (a) Electric signs and...
29 CFR 1910.306 - Specific purpose equipment and installations.
Code of Federal Regulations, 2012 CFR
2012-07-01
... and multicar installations. On single-car and multicar installations, equipment receiving electrical... ADMINISTRATION, DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH STANDARDS Electrical Design Safety Standards for Electrical Systems § 1910.306 Specific purpose equipment and installations. (a) Electric signs and...
29 CFR 1910.306 - Specific purpose equipment and installations.
Code of Federal Regulations, 2013 CFR
2013-07-01
... and multicar installations. On single-car and multicar installations, equipment receiving electrical... ADMINISTRATION, DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH STANDARDS Electrical Design Safety Standards for Electrical Systems § 1910.306 Specific purpose equipment and installations. (a) Electric signs and...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bergey, M.
This paper presents an overview of the electric power system in Thailand. 99% of the country is electrified, but much of this is with diesel generators which leaves high costs but a high level of service. The paper discusses renewable energy projects which have been sited in the country, and examples of hybrid systems which have been retrofit into existing diesel generator systems. Photovoltaic and hydroelectric power projects are described. Dedicated systems have been installed for water pumping and battery charging applications.
Yakama Nation Renewable Energy Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rigdon, Phillip
2016-05-10
It is the intention of the Yakama Nation to make improvements on the Wapato Irrigation Project (WIP) for the benefit of all stakeholders. Water management, water conservation and water allocation on the Wapato Irrigation Project is equally as important as hydropower. Irrigation will always be the primary purpose of this water system, but the irrigation system can also generate energy. The purpose of this project is the purchase and installation of inflow water turbines to generate an additional one megawatt of hydro-electrical power. The project will occur in two phases, Environmental Assessment and Project Implementation. The core objective for thismore » proposal is to meet the Yakama Nation’s goal in hydroelectric power development. This will include the installation of inflow water turbines on the Wapato Irrigation Project. The Yakama Nation will prepare an Environmental Assessment in preparation to purchase and install new water turbines for hydropower generation of 1 Megawatt. This is a valuable economic development strategy for Yakama Nation that will create new jobs, improve and increase rural electrification, and attract private investments. This water system has an untapped low head/low power potential without the need to construct a new dam. The objective of Phase 1 is to complete an environmental assessment and obtain approval to proceed with installation of the hydroelectric power system.« less
NASA Astrophysics Data System (ADS)
Sinkevich, OA; Gerasimov, DN; Glazkov, VV
2017-11-01
Three important physical and technical problems for solar power stations (SPS) are considered: collection of solar energy and effective conversion of this energy to electricity in space power stations, energy transportation by the microwave beam to the Earth surface and direct utilization of the microwave beam energy for global environmental problems. Effectiveness of solar energy conversion into electricity in space power stations using gas and steam turbines plants, and magneto-hydrodynamic generator (MHDG) are analyzed. The closed cycle MHDG working on non-equilibrium magnetized plasmas of inert gases seeded with the alkaline metal vapors are considered. The special emphases are placed on MHDG and gas-turbine installations that are operating without compressor. Also opportunities for using the produced by space power stations energy for ecological needs on Earth and in Space are discussed.
NASA Astrophysics Data System (ADS)
Linkevics, O.; Ivanova, P.; Balodis, M.
2016-12-01
Intermittent generation (solar PV and wind energy) integration in power production portfolio as well as electricity price fluctuations have changed the running manner of conventional combined heat and power (CHP) plants: the shift from base load operation to running in cyclic modes. These cogeneration power plants are not adapted to new running conditions. The level of CHP plant flexibility should be improved to operate profitably and efficiently from both technical and fuel usage point of view. There are different ways to increase the flexibility of power plants. Before any improvements, the situation at power plants should be evaluated and the weakest points defined. In this publication, such measures are presented on Riga CHP-2 plant example: installation of heat storage tank; extension of operation rang; acceleration of start-ups.
46 CFR 183.378 - Ungrounded systems.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 7 2014-10-01 2014-10-01 false Ungrounded systems. 183.378 Section 183.378 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.378 Ungrounded systems. Each ungrounded system must be provided with a suitably sensitive ground detection system located at the respective...
46 CFR 183.370 - General grounding requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 7 2012-10-01 2012-10-01 false General grounding requirements. 183.370 Section 183.370 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.370 General grounding...
46 CFR 129.323 - Multiple generators.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Multiple generators. 129.323 Section 129.323 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.323 Multiple generators. If an OSV uses two or more...
46 CFR 183.378 - Ungrounded systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false Ungrounded systems. 183.378 Section 183.378 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.378 Ungrounded systems. Each ungrounded...
46 CFR 129.326 - Dual-voltage generators.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Dual-voltage generators. 129.326 Section 129.326 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.326 Dual-voltage generators. If a dual-voltage...
46 CFR 183.378 - Ungrounded systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 7 2011-10-01 2011-10-01 false Ungrounded systems. 183.378 Section 183.378 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.378 Ungrounded systems. Each ungrounded...
46 CFR 129.323 - Multiple generators.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Multiple generators. 129.323 Section 129.323 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.323 Multiple generators. If an OSV uses two or more...
46 CFR 183.360 - Semiconductor rectifier systems.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 7 2014-10-01 2014-10-01 false Semiconductor rectifier systems. 183.360 Section 183.360 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.360 Semiconductor rectifier...
46 CFR 129.323 - Multiple generators.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Multiple generators. 129.323 Section 129.323 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.323 Multiple generators. If an OSV uses two or more...
46 CFR 183.324 - Dual voltage generators.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false Dual voltage generators. 183.324 Section 183.324 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.324 Dual voltage generators...
46 CFR 129.326 - Dual-voltage generators.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Dual-voltage generators. 129.326 Section 129.326 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.326 Dual-voltage generators. If a dual-voltage...
46 CFR 183.360 - Semiconductor rectifier systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 7 2012-10-01 2012-10-01 false Semiconductor rectifier systems. 183.360 Section 183.360 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.360 Semiconductor rectifier...
46 CFR 183.324 - Dual voltage generators.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 7 2011-10-01 2011-10-01 false Dual voltage generators. 183.324 Section 183.324 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.324 Dual voltage generators...
46 CFR 129.326 - Dual-voltage generators.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Dual-voltage generators. 129.326 Section 129.326 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.326 Dual-voltage generators. If a dual-voltage...
46 CFR 129.323 - Multiple generators.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Multiple generators. 129.323 Section 129.323 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.323 Multiple generators. If an OSV uses two or more...
46 CFR 129.323 - Multiple generators.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Multiple generators. 129.323 Section 129.323 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.323 Multiple generators. If an OSV uses two or more...
46 CFR 129.320 - Generators and motors.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Generators and motors. 129.320 Section 129.320 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.320 Generators and motors. (a) Each generator and...
46 CFR 129.320 - Generators and motors.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Generators and motors. 129.320 Section 129.320 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.320 Generators and motors. (a) Each generator and...
46 CFR 183.324 - Dual voltage generators.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 7 2014-10-01 2014-10-01 false Dual voltage generators. 183.324 Section 183.324 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.324 Dual voltage generators...
46 CFR 183.324 - Dual voltage generators.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 7 2012-10-01 2012-10-01 false Dual voltage generators. 183.324 Section 183.324 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.324 Dual voltage generators...
46 CFR 183.360 - Semiconductor rectifier systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false Semiconductor rectifier systems. 183.360 Section 183.360 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.360 Semiconductor rectifier...
46 CFR 129.320 - Generators and motors.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Generators and motors. 129.320 Section 129.320 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.320 Generators and motors. (a) Each generator and...
46 CFR 183.370 - General grounding requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false General grounding requirements. 183.370 Section 183.370 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.370 General grounding...
46 CFR 129.326 - Dual-voltage generators.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Dual-voltage generators. 129.326 Section 129.326 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.326 Dual-voltage generators. If a dual-voltage...
A Planning Guide for Instructional Networks, Part II.
ERIC Educational Resources Information Center
Daly, Kevin F.
1994-01-01
This second in a series of articles on planning for instructional computer networks focuses on site preparation, installation, service, and support. Highlights include an implementation schedule; classroom and computer lab layouts; electrical power needs; workstations; network cable; telephones; furniture; climate control; and security. (LRW)
46 CFR 183.360 - Semiconductor rectifier systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 7 2011-10-01 2011-10-01 false Semiconductor rectifier systems. 183.360 Section 183.360... TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.360 Semiconductor rectifier systems. (a) Each semiconductor rectifier system must have an adequate heat removal system that prevents...
46 CFR 183.350 - Batteries-general.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Batteries-general. 183.350 Section 183.350 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.350 Batteries—general. (a) Where provisions are made for charging batteries, there must be natural or induced ventilation sufficient to...
46 CFR 183.378 - Ungrounded systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Ungrounded systems. 183.378 Section 183.378 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.378 Ungrounded systems. Each ungrounded system must be provided with a suitably sensitive ground detection system located at the respective...
46 CFR 183.350 - Batteries-general.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false Batteries-general. 183.350 Section 183.350 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.350 Batteries—general. (a) Where provisions are made for charging batteries, there must be natural or induced ventilation sufficient to...
46 CFR 183.350 - Batteries-general.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 7 2011-10-01 2011-10-01 false Batteries-general. 183.350 Section 183.350 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.350 Batteries—general. (a) Where provisions are made for charging batteries, there must be natural or induced ventilation sufficient to...
46 CFR 183.350 - Batteries-general.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 7 2014-10-01 2014-10-01 false Batteries-general. 183.350 Section 183.350 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.350 Batteries—general. (a) Where provisions are made for charging batteries, there must be natural or induced ventilation sufficient to...
46 CFR 183.350 - Batteries-general.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 7 2012-10-01 2012-10-01 false Batteries-general. 183.350 Section 183.350 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.350 Batteries—general. (a) Where provisions are made for charging batteries, there must be natural or induced ventilation sufficient to...
46 CFR 183.360 - Semiconductor rectifier systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Semiconductor rectifier systems. 183.360 Section 183.360... TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.360 Semiconductor rectifier systems. (a) Each semiconductor rectifier system must have an adequate heat removal system that prevents...
Economically Feasible Potentials for Wind Power in China and the US
NASA Astrophysics Data System (ADS)
Lu, X.; McElroy, M. B.; Chris, N. P.; Tchou, J.
2011-12-01
The present study is intended to explore the economic feasible potentials for wind energy in China and the U.S. subject to their policy systems for renewable energy. These two countries were chosen as subject locales for three reasons: first, they are the two largest countries responsible for energy consumption and CO2 emissions; second, these two countries have the largest installed capacities and the fastest annual growth of wind power in the world; third, China and the U.S. have adopted two distinct but representative incentive policies to accelerate exploitation of the renewable energy source from wind. Investments in large-scale wind farms in China gain privileges from the concession policy established under China's Renewable Energy Law. The electricity generated from wind can be sold at a guaranteed price for a concession period (typically the first ten operational years of a wind farm) to ensure the profitability of the wind farm development. The effectiveness of this policy has been evidenced by the swift growth of total installed capacities for wind power over the past five years in China. A spatial financial model was developed to evaluate the bus-bar prices of wind-generated electricity in China following this wind concession policy. The results indicated that wind could accommodate all of the demand for electricity projected for 2030 assuming a guaranteed bus-bar price of 7.6 U.S. Cents per kWh over the concession period. It is noteworthy that the prices of wind-generated electricity could be as cheap as conventional power generation in the years following the concession period. The power market in the U.S. is more deregulated and electricity is normally traded in a bidding process an hour to a day ahead of real time. Accordingly, the market-oriented policy instrument of PTC subsidies was instituted in the U.S. to ensure the competitiveness of wind power compared to the conventional power generation in the regional power markets. The spatial financial model developed for previous analysis of wind energy in China was tailored to simulate the relevant investment environments for U.S. wind projects. A particular problem was investigated as to how the profitability and competitiveness of onshore wind power in the U.S. would be influenced by PTC subsidy levels varying from 0 to 4 cents per kWh. The results suggested that the current PTC level (2.1 cent per kWh) is at a critical point in determining the competitiveness of wind-generated electricity under normal costs. Setting system integration challenges aside, the potential for profitable wind-generated electricity could accommodate more than seven times U.S. electricity demand at the current PTC subsidy. Similar to the concession policy adopted in China, PTC subsidies are only available for the first ten years following the initiation of wind farms; wind power would still offer a renewable energy source for profitable electricity generation during the post-PTC period.
Williams, C.F.
2002-01-01
Based on current projections, the United States faces the need to increase its electrical power generating capacity by 40% (approximately 300,000 Megawatts-electrical or MWe) over the next 20 years (Energy Information Administration, EIA - Department of Energy). A critical question for the near future is the extent to which geothermal resources can contribute to this increasing demand for electricity. Geothermal energy constitutes one of the nation's largest sources of renewable and environmentally benign electrical power, yet the installed capacity of 2860 MWe falls far short of estimated geothermal resources. This is particularly true for the Great Basin region of the western United States, which has an installed capacity of about 500 MWe, much lower than the 7500 MWe resource estimated by the U.S. Geological Survey (USGS) in the late 1970s. The reasons for the limited development of geothermal power are varied, but political, economic and technological developments suggest the time is ripe for a new assessment effort. Technologies for power production from geothermal systems and scientific understanding of geothermal resource occurrence have improved dramatically in recent years. The primary challenges facing geothermal resource studies are (1) understanding the thermal, chemical and mechanical processes that lead to the colocation of high temperatures and high permeabilities necessary for the formation of geothermal systems and (2) developing improved techniques for locating, characterizing and exploiting these systems. Starting in the fall of 2002, the USGS will begin work with institutions funded by the Department of Energy's (DOE) Geothermal Research Program to investigate the nature and extent of geothermal systems in the Great Basin and to produce an updated assessment of available geothermal resources.
Fuel cells provide a revenue-generating solution to power quality problems
DOE Office of Scientific and Technical Information (OSTI.GOV)
King, J.M. Jr.
Electric power quality and reliability are becoming increasingly important as computers and microprocessors assume a larger role in commercial, health care and industrial buildings and processes. At the same time, constraints on transmission and distribution of power from central stations are making local areas vulnerable to low voltage, load addition limitations, power quality and power reliability problems. Many customers currently utilize some form of premium power in the form of standby generators and/or UPS systems. These include customers where continuous power is required because of health and safety or security reasons (hospitals, nursing homes, places of public assembly, air trafficmore » control, military installations, telecommunications, etc.) These also include customers with industrial or commercial processes which can`t tolerance an interruption of power because of product loss or equipment damage. The paper discusses the use of the PC25 fuel cell power plant for backup and parallel power supplies for critical industrial applications. Several PC25 installations are described: the use of propane in a PC25; the use by rural cooperatives; and a demonstration of PC25 technology using landfill gas.« less
Why silicon is and will remain the dominant photovoltaic material
NASA Astrophysics Data System (ADS)
Singh, Rajendra
2009-07-01
Rising demands of energy in emerging economies, coupled with the green house gas emissions related problems around the globe have provided a unique opportunity of exploiting the advantages offered by photovoltaic (PV) systems for green energy electricity generation. Similar to cell phones, power generated by PV systems can reach over two billion people worldwide who have no access to clean energy. Only silicon based PV devices meet the low-cost manufacturing criterion of clean energy conversion (abundance of raw material and no environmental health and safety issues). The use of larger size glass substrates and manufacturing techniques similar to the ones used by the liquid crystal display industry and the large scale manufacturing of amorphous silicon thin films based modules (~ GW per year manufacturing at a single location) can lead to installed PV system cost of $3/Wp. This will open a huge market for grid connected PV systems and related markets. With further research and development, this approach can provide $2/Wp installed PV system costs in the next few years. At this cost level, PV electricity generation is competitive with any other technology, and PV power generation can be a dominant electricity generation technology in the 21st century.
Lesson Learned from Technical and Economic Performance Assessment and Benefit Evaluation of CHP-FCS
DOE Office of Scientific and Technical Information (OSTI.GOV)
Makhmalbaf, Atefe; Brooks, Kriston P.; Srivastava, Viraj
2014-08-22
Recent efforts and interest in combined heat and power (CHP) have increased with the momentum provided by the federal government support for penetration of CHP systems. Combined heat and power fuel cell systems (CHP-FCSs) provide consistent electrical power and utilize the heat normally wasted in power generation for useful heating or cooling with lower emissions compared to alternative sources. A recent study investigated the utilization of CHP-FCSs in the range of 5 to 50KWe in various commercial building types and geographic locations. Electricity, heating, and water heating demands were obtained from simulation of the U.S. Department of Energy (DOE) commercialmore » reference building models for various building types. Utility rates, cost of equipment, and system efficiency were used to examine economic payback in different scenarios. As a new technology in the early stages of adoption, CHP-FCSs are more expensive than alternative technologies, and the high capital cost of the CHP-FCSs results in a longer payback period than is typically acceptable for all but early-adopter market segments. However, the installation of these units as on-site power generators also provide several other benefits that make them attractive to building owners and operators. The business case for CHP-FCSs can be made more financially attractive through the provision of government incentives and when installed to support strategic infrastructure, such as military installations or data centers. The results presented in this paper intend to provide policy makers with information to define more customized incentives and tax credits based on a sample of building types and geographic locations in order to attract more business investment in this new technology.« less
Design and fabrication of a low-cost Darrieus vertical-axis wind-turbine system, volume 2
NASA Astrophysics Data System (ADS)
1983-03-01
The fabrication, installation, and checkout of 100-kW 17 meter vertical axis wind turbines is described. Turbines are Darrieus-type VAWIs with rotors 17 meters and 25.15 meters in height. They can produce 100 kW of electric power at a cost of energy as low as 3 cents per kWh, in an 18-mph wind regime using 12% annualized costs. Four turbines were produced; three are installed and are operable. Contract results are documented.
A Two-Stage Stochastic Mixed-Integer Programming Approach to the Smart House Scheduling Problem
NASA Astrophysics Data System (ADS)
Ozoe, Shunsuke; Tanaka, Yoichi; Fukushima, Masao
A “Smart House” is a highly energy-optimized house equipped with photovoltaic systems (PV systems), electric battery systems, fuel cell cogeneration systems (FC systems), electric vehicles (EVs) and so on. Smart houses are attracting much attention recently thanks to their enhanced ability to save energy by making full use of renewable energy and by achieving power grid stability despite an increased power draw for installed PV systems. Yet running a smart house's power system, with its multiple power sources and power storages, is no simple task. In this paper, we consider the problem of power scheduling for a smart house with a PV system, an FC system and an EV. We formulate the problem as a mixed integer programming problem, and then extend it to a stochastic programming problem involving recourse costs to cope with uncertain electricity demand, heat demand and PV power generation. Using our method, we seek to achieve the optimal power schedule running at the minimum expected operation cost. We present some results of numerical experiments with data on real-life demands and PV power generation to show the effectiveness of our method.
High Efficiency Nuclear Power Plants Using Liquid Fluoride Thorium Reactor Technology
NASA Technical Reports Server (NTRS)
Juhasz, Albert J.; Rarick, Richard A.; Rangarajan, Rajmohan
2009-01-01
An overall system analysis approach is used to propose potential conceptual designs of advanced terrestrial nuclear power plants based on Oak Ridge National Laboratory (ORNL) Molten Salt Reactor (MSR) experience and utilizing Closed Cycle Gas Turbine (CCGT) thermal-to-electric energy conversion technology. In particular conceptual designs for an advanced 1 GWe power plant with turbine reheat and compressor intercooling at a 950 K turbine inlet temperature (TIT), as well as near term 100 MWe demonstration plants with TITs of 950 and 1200 K are presented. Power plant performance data were obtained for TITs ranging from 650 to 1300 K by use of a Closed Brayton Cycle (CBC) systems code which considered the interaction between major sub-systems, including the Liquid Fluoride Thorium Reactor (LFTR), heat source and heat sink heat exchangers, turbo-generator machinery, and an electric power generation and transmission system. Optional off-shore submarine installation of the power plant is a major consideration.
Innovation Incubator: Whisker Labs Technical Evaluation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sparn, Bethany F.; Frank, Stephen M.; Earle, Lieko
The Wells Fargo Innovation Incubator (IN2) is a program to foster and accelerate startup companies with commercial building energy-efficiency and demand management technologies. The program is funded by the Wells Fargo Foundation and co-administered by the National Renewable Energy Laboratory (NREL). Whisker Labs, an Oakland, California-based company, was one of four awardees in the first IN2 cohort and was invited to participate in the program because of its novel electrical power sensing technology for circuit breakers. The stick-on Whisker meters install directly on the front face of the circuit breakers in an electrical panel using adhesive, eliminating the need tomore » open the panel and install current transducers (CTs) on the circuit wiring.« less
The Business Case for Fuel Cells: Delivering Sustainable Value
DOE Office of Scientific and Technical Information (OSTI.GOV)
Curtin, Sandra; Gangi, Jennifer
This report, written and compiled by Argonne National Laboratory and the Fuel Cell and Hydrogen Energy Association with support from the Fuel Cell Technologies Office, provides an overview of private sector fuel cell installations at U.S. businesses as of December 31, 2016. Over the past few decades, hundreds of thousands of fuel cells have been installed around the world, for primary or backup power, as well as in various other applications including portable and emergency backup power. Fuel cells have also been deployed in other applications such as heat and electricity for homes and apartments, material handling, passenger vehicles, buses,more » and remote, off-grid sites.« less
Space/lunar solar power systems research and needs (1999)
NASA Astrophysics Data System (ADS)
Criswell, David R.; Waldron, Robert D.
1999-01-01
Average per capita incomes of people in the Developed and Developing Nations have been diverging since the 1800s. The divergence increased after World War II. Now the per capita cost of commercial energy in the Developing Nations is a large fraction of the per capita income within the Developing Nations. Solar electric power could be provided to Earth from space or lunar installations. This new source power must be low in cost, <=1 ¢/kWe-h, in order to accelerate economic growth in the Developing Nations. Microwave beams appear to be the preferable method of delivering power to Earth. In order to provide low cost solar-electric power the projected cost of the microwave rectifier/antennas, termed rectennas, must be reduced. A reflector-rectenna is proposed to concentrate microwaves before they are converted by compact sets of antenna/rectifiers to electric power. Rectenna costs may be reduced by a factor of 5 and energy costs to the order of 1 ¢/kWe-h or less. The primary disadvantages of the concentrators are an ~10% loss in efficiency and re-emission of non-captured microwave energy.
NASA Astrophysics Data System (ADS)
Kato, Takeyoshi; Sugimoto, Hiroyuki; Suzuoki, Yasuo
We established a procedure for estimating regional electricity demand and regional potential capacity of distributed generators (DGs) by using a grid square statistics data set. A photovoltaic power system (PV system) for residential use and a co-generation system (CGS) for both residential and commercial use were taken into account. As an example, the result regarding Aichi prefecture was presented in this paper. The statistical data of the number of households by family-type and the number of employees by business category for about 4000 grid-square with 1km × 1km area was used to estimate the floor space or the electricity demand distribution. The rooftop area available for installing PV systems was also estimated with the grid-square statistics data set. Considering the relation between a capacity of existing CGS and a scale-index of building where CGS is installed, the potential capacity of CGS was estimated for three business categories, i.e. hotel, hospital, store. In some regions, the potential capacity of PV systems was estimated to be about 10,000kW/km2, which corresponds to the density of the existing area with intensive installation of PV systems. Finally, we discussed the ratio of regional potential capacity of DGs to regional maximum electricity demand for deducing the appropriate capacity of DGs in the model of future electricity distribution system.
14 CFR 29.1353 - Electrical equipment and installations.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Equipment § 29.1353 Electrical equipment and installations. (a) Electrical equipment, controls, and wiring... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Electrical equipment and installations. 29... installations has shown that maintaining safe cell temperatures and pressures presents no problem. (3) No...
Lenssen, N
1992-01-01
Rural areas in developing countries have no hope of benefiting from electricity generation programs because of a lack of resources. Currently the common practice is to use kerosene lamps for light, disposable batteries for radios, and auto batteries for television. The auto battery must be hauled by pack animal to a charging station. An alternative that is growing in popularity is the installation of photovoltaic (PV) systems in each house. The advantages include very low operating costs (sunshine is free), long life (PV cells last 20 years), they can be installed in any home without regard for power grids. The biggest disadvantage is very high initial cost. To solve this problem many programs have been developed to finance systems. Enersol Associates started with $10,000 seed money and developed a loan program that has helped bring electricity to 1500 homes in the Dominican Republic. The Solar Electric Light and Fund started with $150,000 and has brought electricity to 3500 homes in Sri Lanka. The United Nations Development Program gave $7 million to Zimbabwe to fund a project that is expected to bring electricity to 20,000 homes over the next 5 years.
Electrical cable utilization for wave energy converters
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bull, Diana; Baca, Michael; Schenkman, Benjamin
Here, this paper investigates the suitability of sizing the electrical export cable based on the rating of the contributing WECs within a farm. These investigations have produced a new methodology to evaluate the probabilities associated with peak power values on an annual basis. It has been shown that the peaks in pneumatic power production will follow an exponential probability function for a linear model. A methodology to combine all the individual probability functions into an annual view has been demonstrated on pneumatic power production by a Backward Bent Duct Buoy (BBDB). These investigations have also resulted in a highly simplifiedmore » and perfunctory model of installed cable cost as a function of voltage and conductor cross-section. This work solidifies the need to determine electrical export cable rating based on expected energy delivery as opposed to device rating as small decreases in energy delivery can result in cost savings.« less
Electrical cable utilization for wave energy converters
Bull, Diana; Baca, Michael; Schenkman, Benjamin
2018-04-27
Here, this paper investigates the suitability of sizing the electrical export cable based on the rating of the contributing WECs within a farm. These investigations have produced a new methodology to evaluate the probabilities associated with peak power values on an annual basis. It has been shown that the peaks in pneumatic power production will follow an exponential probability function for a linear model. A methodology to combine all the individual probability functions into an annual view has been demonstrated on pneumatic power production by a Backward Bent Duct Buoy (BBDB). These investigations have also resulted in a highly simplifiedmore » and perfunctory model of installed cable cost as a function of voltage and conductor cross-section. This work solidifies the need to determine electrical export cable rating based on expected energy delivery as opposed to device rating as small decreases in energy delivery can result in cost savings.« less
The impact of monsoon intraseasonal variability on renewable power generation in India
NASA Astrophysics Data System (ADS)
Dunning, C. M.; Turner, A. G.; Brayshaw, D. J.
2015-06-01
India is increasingly investing in renewable technology to meet rising energy demands, with hydropower and other renewables comprising one-third of current installed capacity. Installed wind-power is projected to increase 5-fold by 2035 (to nearly 100GW) under the International Energy Agency's New Policies scenario. However, renewable electricity generation is dependent upon the prevailing meteorology, which is strongly influenced by monsoon variability. Prosperity and widespread electrification are increasing the demand for air conditioning, especially during the warm summer. This study uses multi-decadal observations and meteorological reanalysis data to assess the impact of intraseasonal monsoon variability on the balance of electricity supply from wind-power and temperature-related demand in India. Active monsoon phases are characterized by vigorous convection and heavy rainfall over central India. This results in lower temperatures giving lower cooling energy demand, while strong westerly winds yield high wind-power output. In contrast, monsoon breaks are characterized by suppressed precipitation, with higher temperatures and hence greater demand for cooling, and lower wind-power output across much of India. The opposing relationship between wind-power supply and cooling demand during active phases (low demand, high supply) and breaks (high demand, low supply) suggests that monsoon variability will tend to exacerbate fluctuations in the so-called demand-net-wind (i.e., electrical demand that must be supplied from non-wind sources). This study may have important implications for the design of power systems and for investment decisions in conventional schedulable generation facilities (such as coal and gas) that are used to maintain the supply/demand balance. In particular, if it is assumed (as is common) that the generated wind-power operates as a price-taker (i.e., wind farm operators always wish to sell their power, irrespective of price) then investors in conventional facilities will face additional weather-volatility through the monsoonal impact on the length and frequency of production periods (i.e. their load-duration curves).
Preliminary Design of a Solar Photovoltaic Array for Net-Zero Energy Buildings at NASA Langley
NASA Technical Reports Server (NTRS)
Cole, Stuart K.; DeYoung, Russell J.
2012-01-01
An investigation was conducted to evaluate photovoltaic (solar electric systems) systems for a single building at NASA Langley as a representative case for alternative sustainable power generation. Building 1250 in the Science Directorate is comprised of office and laboratory space, and currently uses approximately 250,000 kW/month of electrical power with a projected use of 200,000 kW/month with additional conservation measures. The installation would be applied towards a goal for having Building 1250 classified as a net-zero energy building as it would produce as much energy as it uses over the course of a year. Based on the facility s electrical demand, a photovoltaic system and associated hardware were characterized to determine the optimal system, and understand the possible impacts from its deployment. The findings of this investigation reveal that the 1.9 MW photovoltaic electrical system provides favorable and robust results. The solar electric system should supply the needed sustainable power solution especially if operation and maintenance of the system will be considered a significant component of the system deployment.
46 CFR 167.40-1 - Electrical installations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Electrical installations. 167.40-1 Section 167.40-1... SHIPS Certain Equipment Requirements § 167.40-1 Electrical installations. (a) Except as otherwise...) Changes or alterations in the electrical installations of vessels now in service shall be in accordance...
24 CFR 3280.811 - Calculations.
Code of Federal Regulations, 2010 CFR
2010-04-01
... motors and heater loads (exhaust fans, air conditioners, electric, gas, or oil heating). Omit smaller of air conditioning and heating except include blower motor if used as air conditioner evaporator motor. When an air conditioner is not installed and a 40-ampere power supply cord is provided, allow 15...
NATIONAL ASSESSMENT OF EMISSIONS REDUCTION IMPACT FROM ROOFTOP PV
This effort will determine the emissions impacts to the U.S. PV generated electricity when PV systems are installed on building rooftops and employed as demand-side power supplies. The national assessment will be based on data provided by existing rooftop PV systems that have be...
Electrician's Mate 3 & 2: Rate Training Manual.
ERIC Educational Resources Information Center
Naval Education and Training Command, Pensacola, FL.
The training manual provides information related to the tasks assigned to the Electrician's Mate Third and Second Class who operate and maintain power and lighting systems and associated equipment. Individual chapters deal with: career challenges for the Electrician's Mate, safety precautions, test equipment, electrical installations, A-C power…
46 CFR 183.320 - Generators and motors.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false Generators and motors. 183.320 Section 183.320 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.320 Generators and motors. (a) Each...
46 CFR 183.320 - Generators and motors.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Generators and motors. 183.320 Section 183.320 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.320 Generators and motors. (a) Each...
46 CFR 183.320 - Generators and motors.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 7 2014-10-01 2014-10-01 false Generators and motors. 183.320 Section 183.320 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.320 Generators and motors. (a) Each...
46 CFR 183.372 - Equipment and conductor grounding.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false Equipment and conductor grounding. 183.372 Section 183.372 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.372 Equipment and...
46 CFR 183.320 - Generators and motors.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 7 2011-10-01 2011-10-01 false Generators and motors. 183.320 Section 183.320 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.320 Generators and motors. (a) Each...
46 CFR 183.320 - Generators and motors.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 7 2012-10-01 2012-10-01 false Generators and motors. 183.320 Section 183.320 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.320 Generators and motors. (a) Each...
Energy-reduction concept for incandescent lamps
NASA Technical Reports Server (NTRS)
Vorhaben, K. H.
1981-01-01
Reusable infrared reflector maintains filament temperature and reduces power requirements. Fixed installed over light bulb directs energy formerly lost back to lamp filament. This energy aids electric current in heating filament, allowing lower-wattage bulb to produce same amount of light as higher-wattage bulb in ordinary fixture.
Code of Federal Regulations, 2013 CFR
2013-01-01
.../alternator. (5) Each generator/alternator must have an overvoltage control designed and installed to prevent... control and protective devices, must be able to furnish the required power at the proper voltage to each... detrimental substances, and mechanical damage; and (iii) So designed that the risk of electrical shock to crew...
Code of Federal Regulations, 2011 CFR
2011-01-01
.../alternator. (5) Each generator/alternator must have an overvoltage control designed and installed to prevent... control and protective devices, must be able to furnish the required power at the proper voltage to each... detrimental substances, and mechanical damage; and (iii) So designed that the risk of electrical shock to crew...
Code of Federal Regulations, 2014 CFR
2014-01-01
.../alternator. (5) Each generator/alternator must have an overvoltage control designed and installed to prevent... control and protective devices, must be able to furnish the required power at the proper voltage to each... detrimental substances, and mechanical damage; and (iii) So designed that the risk of electrical shock to crew...
Code of Federal Regulations, 2012 CFR
2012-01-01
.../alternator. (5) Each generator/alternator must have an overvoltage control designed and installed to prevent... control and protective devices, must be able to furnish the required power at the proper voltage to each... detrimental substances, and mechanical damage; and (iii) So designed that the risk of electrical shock to crew...
Code of Federal Regulations, 2010 CFR
2010-01-01
.../alternator. (5) Each generator/alternator must have an overvoltage control designed and installed to prevent... control and protective devices, must be able to furnish the required power at the proper voltage to each... detrimental substances, and mechanical damage; and (iii) So designed that the risk of electrical shock to crew...
46 CFR 129.340 - Cable and wiring.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Cable and wiring. 129.340 Section 129.340 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.340 Cable and wiring. (a) If individual wires, rather than...
2016-10-28
assumptions. List of Assumptions: Price of electrical energy : $0.07/kWh flat rate for energy at the base Price of peak power: $15/MW peak power...EW-201147) Advanced Micro-Grid Energy Management Coupled with Integrated Volt/VAR Control for Improved Energy Efficiency, Energy Security, and...12-C-0002 5b. GRANT NUMBER Advanced Micro-Grid Energy Management Coupled with Integrated Volt/VAR Control for Improved Energy Efficiency, Energy
Coordinated Scheduling for Interdependent Electric Power and Natural Gas Infrastructures
Zlotnik, Anatoly; Roald, Line; Backhaus, Scott; ...
2016-03-24
The extensive installation of gas-fired power plants in many parts of the world has led electric systems to depend heavily on reliable gas supplies. The use of gas-fired generators for peak load and reserve provision causes high intraday variability in withdrawals from high-pressure gas transmission systems. Such variability can lead to gas price fluctuations and supply disruptions that affect electric generator dispatch, electricity prices, and threaten the security of power systems and gas pipelines. These infrastructures function on vastly different spatio-temporal scales, which prevents current practices for separate operations and market clearing from being coordinated. Here in this article, wemore » apply new techniques for control of dynamic gas flows on pipeline networks to examine day-ahead scheduling of electric generator dispatch and gas compressor operation for different levels of integration, spanning from separate forecasting, and simulation to combined optimal control. We formulate multiple coordination scenarios and develop tractable physically accurate computational implementations. These scenarios are compared using an integrated model of test networks for power and gas systems with 24 nodes and 24 pipes, respectively, which are coupled through gas-fired generators. The analysis quantifies the economic efficiency and security benefits of gas-electric coordination and dynamic gas system operation.« less
NASA Astrophysics Data System (ADS)
Moyer, Rachael M.
Following a proposal for the installation of high voltage power lines in northwest Arkansas, a controversial policy debate emerged. Proponents of the transmission line argue that such an installation is inevitable and necessary to efficiently and reliably support the identified electric load in the region. Opponents claim that the lines will degrade the natural environment and hamper the tourism-based local economy in affected regions, notably in Ozark Mountain areas. This study seeks to understand how local policy elites perceive the benefits and risks associated with proposed transmission lines, which is a critical step in comprehending the formation and changes of related government policies. First, based upon the dual process theory of judgment, this study systematically investigates the triadic relationships between (a) more profound personal value predispositions, (b) affects and feelings, and (c) perceived benefits and risks related to the proposed installation of high voltage power lines among local policy elites in the state of Arkansas. Next, this study focuses more specifically on the role of value predispositions, specific emotional dimensions of affect heuristics, and perceptions pertaining to high voltage power line risks and benefits. Using original data collected from a statewide Internet survey of 420 local leaders and key policymakers about their opinions on the related issues, other factors claimed by previous literature, including trust, knowledge level, and demographic characteristics are considered. Analytical results suggest that grid-group cultural predispositions, as deeply held core values within local policy elites' individual belief systems, both directly and indirectly -- through affective feelings -- shape perceived utility associated with the installation of high voltage power lines. Recognizing that risk perceptions factor into policy decisions, some practical considerations for better designing policy addressing controversial issues of this nature.
SIGAR Quarterly Report to the United States Congress
2016-07-30
electricity from sources such as mini-hydro turbines in streams, solar panels with battery storage, and wind turbines , but these are still a negligible...power, solar PV [photo-voltaic units], and wind turbines , is the most promising option for feasible, sustainable decentralized rural electrification...informed SIGAR that the installation of a third power-generating turbine at Kajaki Dam should be complete in September 2016—security conditions permitting
Thermionic system evaluated test (TSET) facility description
NASA Astrophysics Data System (ADS)
Fairchild, Jerry F.; Koonmen, James P.; Thome, Frank V.
1992-01-01
A consortium of US agencies are involved in the Thermionic System Evaluation Test (TSET) which is being supported by the Strategic Defense Initiative Organization (SDIO). The project is a ground test of an unfueled Soviet TOPAZ-II in-core thermionic space reactor powered by electrical heat. It is part of the United States' national thermionic space nuclear power program. It will be tested in Albuquerque, New Mexico at the New Mexico Engineering Research Institute complex by the Phillips Laboratoty, Sandia National Laboratories, Los Alamos National Laboratory, and the University of New Mexico. One of TSET's many objectives is to demonstrate that the US can operate and test a complete space nuclear power system, in the electrical heater configuration, at a low cost. Great efforts have been made to help reduce facility costs during the first phase of this project. These costs include structural, mechanical, and electrical modifications to the existing facility as well as the installation of additional emergency systems to mitigate the effects of utility power losses and alkali metal fires.
Photovoltaics and solar thermal conversion to electricity - Status and prospects
NASA Technical Reports Server (NTRS)
Alper, M. E.
1979-01-01
Photovoltaic power system technology development includes flat-plate silicon solar arrays and concentrating solar cell systems, which use silicon and other cell materials such as gallium arsenide. System designs and applications include small remote power systems ranging in size from tens of watts to tens of kilowatts, intermediate load-center applications ranging in size from tens to hundreds of kilowatts, and large central plant installations, as well as grid-connected rooftop applications. The thermal conversion program is concerned with large central power systems and small power applications.
A review of oscillating water columns.
Heath, T V
2012-01-28
This paper considers the history of oscillating water column (OWC) systems from whistling buoys to grid-connected power generation systems. The power conversion from the wave resource through to electricity via pneumatic and shaft power is discussed in general terms and with specific reference to Voith Hydro Wavegen's land installed marine energy transformer (LIMPET) plant on the Scottish island of Islay and OWC breakwater systems. A report on the progress of other OWC systems and power take-off units under commercial development is given, and the particular challenges faced by OWC developers reviewed.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sullivan, W.N.; Nellums, R.O.
1979-08-01
The A.T. Kearney and Alcoa economic studies are two independent attempts to assess the installed costs of a series of six Darrieus vertical axis wind turbine designs. The designs cover a range of sizes with peak outputs from 10 to 1600 kW. All are designed to produce utility grid electrical power. Volume IV of this report summarizes, compares, and analyzes the results of these studies. The Kearney and Alcoa final reports are included in the Appendices.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sullivan, W.N.; Nellums, R.O.
1979-08-01
The A. T. Kearney and Alcoa economic studies are two independent attempts to assess the installed costs of a series of six Darrieus vertical axis wind turbine designs. The designs cover a range of sizes with peak outputs from 10 to 1600 kW. All are designed to produce utility grid electrical power. Volume IV of this report summarizes, compares, and analyzes the results of these studies. The Kearney and Alcoa final reports are included in the Appendices.
Installation of a second superconducting wiggler at SAGA-LS
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kaneyasu, T., E-mail: kaneyasu@saga-ls.jp; Takabayashi, Y.; Iwasaki, Y.
The SAGA Light Source is a synchrotron radiation facility consisting of a 255 MeV injector linac and a 1.4 GeV storage ring with a circumference of 75.6 m. A superconducting wiggler (SCW) with a peak magnetic field of 4 T has been routinely operating for generating hard X-rays since its installation in 2010. In light of this success, it was decided to install a second SCW as a part of the beamline construction by Sumitomo Electric Industries. To achieve this, machine modifications including installation of a new magnet power supply, improvement of the magnet control system, and replacement of themore » vacuum chambers in the storage ring were carried out. Along with beamline construction, installation and commissioning of the second SCW are scheduled to take place in 2015.« less
Analysis of thermodynamics of two-fuel power unit integrated with a carbon dioxide separation plant
NASA Astrophysics Data System (ADS)
Kotowicz, Janusz; Bartela, Łukasz; Mikosz, Dorota
2014-12-01
The article presents the results of thermodynamic analysis of the supercritical coal-fired power plant with gross electrical output of 900 MW and a pulverized coal boiler. This unit is integrated with the absorption-based CO2 separation installation. The heat required for carrying out the desorption process, is supplied by the system with the gas turbine. Analyses were performed for two variants of the system. In the first case, in addition to the gas turbine there is an evaporator powered by exhaust gases from the gas turbine expander. The second expanded variant assumes the application of gas turbine combined cycle with heat recovery steam generator and backpressure steam turbine. The way of determining the efficiency of electricity generation and other defined indicators to assess the energy performance of the test block was showed. The size of the gas turbine system was chosen because of the need for heat for the desorption unit, taking the value of the heat demand 4 MJ/kg CO2. The analysis results obtained for the both variants of the installation with integrated CO2 separation plant were compared with the results of the analysis of the block where the separation is not conducted.
14 CFR 25.1353 - Electrical equipment and installations.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Electrical equipment and installations. 25... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Equipment Electrical Systems and Equipment § 25.1353 Electrical equipment and installations. (a) Electrical equipment and controls must be...
14 CFR 25.1353 - Electrical equipment and installations.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Electrical equipment and installations. 25... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Equipment Electrical Systems and Equipment § 25.1353 Electrical equipment and installations. (a) Electrical equipment and controls must be...
14 CFR 25.1353 - Electrical equipment and installations.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Electrical equipment and installations. 25... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Equipment Electrical Systems and Equipment § 25.1353 Electrical equipment and installations. (a) Electrical equipment and controls must be...
14 CFR 29.1353 - Electrical equipment and installations.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Electrical equipment and installations. 29... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Equipment Electrical Systems and Equipment § 29.1353 Electrical equipment and installations. (a) Electrical equipment, controls, and wiring...
14 CFR 29.1353 - Electrical equipment and installations.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Electrical equipment and installations. 29... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Equipment Electrical Systems and Equipment § 29.1353 Electrical equipment and installations. (a) Electrical equipment, controls, and wiring...
14 CFR 25.1353 - Electrical equipment and installations.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Electrical equipment and installations. 25... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Equipment Electrical Systems and Equipment § 25.1353 Electrical equipment and installations. (a) Electrical equipment and controls must be...
14 CFR 29.1353 - Electrical equipment and installations.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Electrical equipment and installations. 29... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Equipment Electrical Systems and Equipment § 29.1353 Electrical equipment and installations. (a) Electrical equipment, controls, and wiring...
Study on a hypothetical replacement of nuclear electricity by wind power in Sweden
NASA Astrophysics Data System (ADS)
Wagner, F.; Rachlew, E.
2016-05-01
The Swedish electricity supply system benefits strongly from the natural conditions which allow a high share of hydroelectricity. A complete supply is, however, not possible. Up to now, nuclear power is the other workhorse to serve the country with electricity. Thus, electricity production of Sweden is basically CO2 -free and Sweden has reached an environmental status which others in Europe plan to reach in 2050. Furthermore, there is an efficient exchange within the Nordic countries, Nordpol, which can ease possible capacity problems during dry cold years. In this study we investigate to what extent and with what consequences the base load supply of nuclear power can be replaced by intermittent wind power. Such a scenario leads unavoidably to high wind power installations. It is shown that hydroelectricity cannot completely smooth out the fluctuations of wind power and an additional back-up system using fossil fuel is necessary. From the operational dynamics, this system has to be based on gas. The back-up system cannot be replaced by a storage using surplus electricity from wind power. The surplus is too little. To overcome this, further strong extension of wind power is necessary which leads, however, to a reduction of the use of hydroelectricity if the annual consumption is kept constant. In this case one fossil-free energy form is replaced by another, however, more complex one. A mix of wind power at 22.3GW plus a gas based back-up system with 8.6GW producing together 64.8TWh would replace the present infrastructure with 9GW nuclear power producing 63.8TWh electricity. The specific CO2 -emission increases to the double in this case. Pumped storage for the exclusive supply of Sweden does not seem to be a meaningful investment.-1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pao, C.K.
1975-05-01
An assessment of wave energy as a source of electrical power in the United Kingdom is reported. British Hovercraft Corporation has conducted some tank tests for Wavepower Limited, studying various simple float systems. It aims to develop a wave-power device that is simple, cheap, made up of small mass- produced units, can be installed in sections, and can be easily maintained. A chain of floats, hinged together, with waves traveling down the chain, was investigated. Pumps on the hinges absorb power from the relative rotation of adjacent floats. A wave-power device could also serve as an effective breakwater. Direct generationmore » of electricity is a feasible application of wave power. The system is compared with a rocking boom concept. Wave energy could be used in conjunction with thermal stations to provide sufficient capacity when wave power is low. Wave power has a high availability when compared with wind power. (MCW)« less
This study investigated the pollutant emission reduction and demand-side management potential of 16 photovoltaic (PV) systems installed across the U.S. in 1993 and 1994. The project was sponsored by the U.S. Environmental Protection Agency (EPA) and 11 electric utilities. This ar...
Case Study: Fuel Cells Provide Combined Heat and Power at Verizon's Garden City Central Office
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2010-12-01
This case study describes how Verizon's Central Office in Garden City, NY, installed a 1.4-MW phosphoric acid fuel cell system as an alternative solution to bolster electric reliability, optimize the company's energy use, and reduce costs in an environmentally responsible manner.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-04
... Units 1 and 2 AGENCY: Nuclear Regulatory Commission. ACTION: Issuance of an environmental assessment and finding of no significant impact. FOR FURTHER INFORMATION CONTACT: Jennie Rankin, Project Manager..., located in Louisa County, Virginia. II. Environmental Assessment (EA) Identification of Proposed Action...
POWER FIELD MONITORING EQUIPMENT FROM WETLAND DETRITUS MATERIALS USING MICROBIAL FUEL CELL
The data from both laboratory and field experiments will provide useful information to assist designing an in-situ MFC system that uses detritus materials to achieve constant and useable electric energy output. The in-situ MFC systems installed in the forested wetlands at Wi...
Tumlison, Creed; Moyer, Rachael M; Song, Geoboo
2017-05-01
The debate over an installation of high-voltage power lines (HVPLs) has been intense, particularly in northwest Arkansas. Detractors claim that the installation will negatively affect both the natural environment and the local economy, which contains a large tourism component. By contrast, those in favor of installing HVPLs claim that the installation is necessary in order to reliably support the increasing demand for electric power. Using original data collected from a recent statewide Internet survey of 420 local policy elites in Arkansas, this article focuses on two key aspects. First, we examine how local policy elites' perceptions of risks versus benefits of HVPL installation in their communities are influenced by their levels of trust toward information provided by various sources (e.g., energy industry, environmental groups, and government). Second, we utilize cultural theory to explain how the cultural worldviews of policy elites--specifically, egalitarianism, individualism, hierarchism, and fatalism--shape these levels of trust and HVPL benefit-risk perceptions, while controlling for other factors claimed by previous literature, including levels of knowledge on energy-related issues and demographic characteristics. In general, our analysis indicates that policy elites' value-oriented formation of HVPL benefit-risk perceptions is partially due to the influence cultural values have on trust in information sources. We conclude this article by discussing broader implications for the origin and role of trust in policy elites' decisions throughout the policy-making process. © 2016 Society for Risk Analysis.
The prospect of nuclear energy in Türkiye especially after Fukushima accident
NASA Astrophysics Data System (ADS)
Şahin, Sümer
2014-09-01
Türkiye considers since mid-50's to use nuclear electricity, but Government and bureaucracy have continuously postponed reactor construction. However, since 2010 the case has gained a real shape. Official agreement has been signed for the construction of 4 units of Russian VVER type reactors with installed power of 4×1200 MWel. It is expected that they will begin to deliver electricity early 20's. Further negotiations are being conducted with Japanese Mitsubashi and French AREVA. The target is to have nuclear electricity by 2023 at the 100th anniversary of Turkish Republic. Turkish Nuclear Energy Strategy aims; • Decrease country's dependency on foreign suppliers of energy sources • Provide fuel supply mix diversification • Utilization of environmentally friendly energy production technologies Possess advanced and prestigious power generation technologies.
Development of new S-band RF window for stable high-power operation in linear accelerator RF system
NASA Astrophysics Data System (ADS)
Joo, Youngdo; Lee, Byung-Joon; Kim, Seung-Hwan; Kong, Hyung-Sup; Hwang, Woonha; Roh, Sungjoo; Ryu, Jiwan
2017-09-01
For stable high-power operation, a new RF window is developed in the S-band linear accelerator (Linac) RF systems of the Pohang Light Source-II (PLS-II) and the Pohang Accelerator Laboratory X-ray Free-Electron Laser (PAL-XFEL). The new RF window is designed to mitigate the strength of the electric field at the ceramic disk and also at the waveguide-cavity coupling structure of the conventional RF window. By replacing the pill-box type cavity in the conventional RF window with an overmoded cavity, the electric field component perpendicular to the ceramic disk that caused most of the multipacting breakdowns in the ceramic disk was reduced by an order of magnitude. The reduced electric field at the ceramic disk eliminated the Ti-N coating process on the ceramic surface in the fabrication procedure of the new RF window, preventing the incomplete coating from spoiling the RF transmission and lowering the fabrication cost. The overmoded cavity was coupled with input and output waveguides through dual side-wall coupling irises to reduce the electric field strength at the waveguide-cavity coupling structure and the possibility of mode competitions in the overmoded cavity. A prototype of the new RF window was fabricated and fully tested with the Klystron peak input power, pulse duration and pulse repetition rate of 75 MW, 4.5 μs and 10 Hz, respectively, at the high-power test stand. The first mass-produced new RF window installed in the PLS-II Linac is running in normal operation mode. No fault is reported to date. Plans are being made to install the new RF window to all S-band accelerator RF modules of the PLS-II and PAL-XFEL Linacs. This new RF window may be applied to the output windows of S-band power sources like Klystron as wells as the waveguide windows of accelerator facilities which operate in S-band.
Demand of the power industry of Russia for gas turbines: the current state and prospects
NASA Astrophysics Data System (ADS)
Filippov, S. P.; Dil'man, M. D.; Ionov, M. S.
2017-11-01
The use of gas-turbine plants (GTPs) in the power industry of Russia is analyzed. Attention is paid to microturbines and low-, medium-, high-, and superhigh-power GTPs. The efficiency of the gas-turbine plants of domestic and foreign manufacture is compared. The actual values of the installed capacity utilization factor and the corresponding efficiency values are calculated for most GTPs operating in the country. The long-term demand of the country's electric power industry for GTPs for the period until 2040 is determined. The estimates have been obtained for three basic applications of the gas turbines, viz., for replacement of the GTPs that have exhausted their lifetime, replacement of outdated gas-turbine plants at gas-and-oilburning power plants, and construction of new thermal power plants to cover the anticipated growing demand for electric power. According to the findings of the research, the main item in the structure of the demand for GTPs will be their use to replace the decommissioned steam-turbine plants, predominantly those integrated into combined-cycle plants. The priority of the reconstruction of the thermal power plants in operation over the construction of new ones is determined by the large excess of accumulated installed capacities in the country and considerable savings on capital costs using production sites with completed infrastructure. It is established that medium- and high-power GTPs will be the most in-demand plants in the electric power industry. The demand for low-power GTPs will increase at high rates. The demand for microturbines is expected to be rather great. The demand for superhigh-power plants will become quantitatively significant after 2025 and grow rapidly afterwards. The necessity of accelerated development of competitive domestic GTPs with a wide range of capacities and mastering of their series manufacture as well as production of licensed gas turbines at a high production localization level on the territory of the country is shown. Considerable home demand for the power-generating GTPs and vast external markets will make the development of efficient domestic GTPs economically viable.
Outstanding issues for new geothermal resource assessments
Williams, C.F.; Reed, M.J.
2005-01-01
A critical question for the future energy policy of the United States is the extent to which geothermal resources can contribute to an ever-increasing demand for electricity. Electric power production from geothermal sources exceeds that from wind and solar combined, yet the installed capacity falls far short of the geothermal resource base characterized in past assessments, even though the estimated size of the resource in six assessments completed in the past 35 years varies by thousands of Megawatts-electrical (MWe). The U. S. Geological Survey (USGS) is working closely with the Department of Energy's (DOE) Geothermal Research Program and other geothermal organizations on a three-year effort to produce an updated assessment of available geothermal resources. The new assessment will introduce significant changes in the models for geothermal energy recovery factors, estimates of reservoir permeability, limits to temperatures and depths for electric power production, and include the potential impact of evolving Enhanced (or Engineered) Geothermal Systems (EGS) technology.
46 CFR 167.40-1 - Electrical installations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... (Electrical Engineering) of this chapter. (3) Institute of Electrical and Electronic Engineers, Inc. (IEEE... 46 Shipping 7 2011-10-01 2011-10-01 false Electrical installations. 167.40-1 Section 167.40-1... SHIPS Certain Equipment Requirements § 167.40-1 Electrical installations. (a) Except as otherwise...
46 CFR 167.40-1 - Electrical installations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... (Electrical Engineering) of this chapter. (3) Institute of Electrical and Electronic Engineers, Inc. (IEEE... 46 Shipping 7 2012-10-01 2012-10-01 false Electrical installations. 167.40-1 Section 167.40-1... SHIPS Certain Equipment Requirements § 167.40-1 Electrical installations. (a) Except as otherwise...