Sample records for electricity transmission infrastructure

  1. SimWIND: A Geospatial Infrastructure Model for Wind Energy Production and Transmission

    NASA Astrophysics Data System (ADS)

    Middleton, R. S.; Phillips, B. R.; Bielicki, J. M.

    2009-12-01

    Wind is a clean, enduring energy resource with a capacity to satisfy 20% or more of the electricity needs in the United States. A chief obstacle to realizing this potential is the general paucity of electrical transmission lines between promising wind resources and primary load centers. Successful exploitation of this resource will therefore require carefully planned enhancements to the electric grid. To this end, we present the model SimWIND for self-consistent optimization of the geospatial arrangement and cost of wind energy production and transmission infrastructure. Given a set of wind farm sites that satisfy meteorological viability and stakeholder interest, our model simultaneously determines where and how much electricity to produce, where to build new transmission infrastructure and with what capacity, and where to use existing infrastructure in order to minimize the cost for delivering a given amount of electricity to key markets. Costs and routing of transmission line construction take into account geographic and social factors, as well as connection and delivery expenses (transformers, substations, etc.). We apply our model to Texas and consider how findings complement the 2008 Electric Reliability Council of Texas (ERCOT) Competitive Renewable Energy Zones (CREZ) Transmission Optimization Study. Results suggest that integrated optimization of wind energy infrastructure and cost using SimWIND could play a critical role in wind energy planning efforts.

  2. Quantifying the daily economic impact of extreme space weather due to failure in electricity transmission infrastructure

    NASA Astrophysics Data System (ADS)

    Oughton, Edward J.; Skelton, Andrew; Horne, Richard B.; Thomson, Alan W. P.; Gaunt, Charles T.

    2017-01-01

    Extreme space weather due to coronal mass ejections has the potential to cause considerable disruption to the global economy by damaging the transformers required to operate electricity transmission infrastructure. However, expert opinion is split between the potential outcome being one of a temporary regional blackout and of a more prolonged event. The temporary blackout scenario proposed by some is expected to last the length of the disturbance, with normal operations resuming after a couple of days. On the other hand, others have predicted widespread equipment damage with blackout scenarios lasting months. In this paper we explore the potential costs associated with failure in the electricity transmission infrastructure in the U.S. due to extreme space weather, focusing on daily economic loss. This provides insight into the direct and indirect economic consequences of how an extreme space weather event may affect domestic production, as well as other nations, via supply chain linkages. By exploring the sensitivity of the blackout zone, we show that on average the direct economic cost incurred from disruption to electricity represents only 49% of the total potential macroeconomic cost. Therefore, if indirect supply chain costs are not considered when undertaking cost-benefit analysis of space weather forecasting and mitigation investment, the total potential macroeconomic cost is not correctly represented. The paper contributes to our understanding of the economic impact of space weather, as well as making a number of key methodological contributions relevant for future work. Further economic impact assessment of this threat must consider multiday, multiregional events.

  3. Investigating the effect of increased wind generation capacity on investment in transmission infrastructure

    NASA Astrophysics Data System (ADS)

    Braswell, Michael G.

    The transmission network that connects electricity generators with consumers is a critical yet often-overlooked component of the nation's electrical power infrastructure. However, the transmission grid has suffered from chronic underinvestment in recent decades due to various economic and regulatory factors that impede timely and efficient investments in transmission. One factor that might help offset these obstacles to transmission is the growth in wind power generation. The assumption among many in the electrical power industry is that wind power investments necessarily require greater investment in transmission due to the fact that wind power is a geographically-restricted resource and cannot always be situated close to areas of high electricity demand. However, to date there have been few, if any, empirical studies to verify this connection. This paper discusses a state-by-state empirical study exploring the relationship between increased wind generation capacity and the level of investment in transmission infrastructure. This study begins with the hypothesis that increases in installed wind generation capacity, in combination with other policies that promote wind energy more generally, should result in higher levels of transmission investment. Using data from the Federal Energy Regulatory Commission (FERC) and the American Wind Energy Association (AWEA), this paper develops regression models suggesting that wind investment has a small but distinct positive impact on transmission investment. This paper then explores the effects of other state renewable energy promotion policies, and discusses the policy implications of these findings.

  4. 18 CFR 35.35 - Transmission infrastructure investment.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... infrastructure investment. 35.35 Section 35.35 Conservation of Power and Water Resources FEDERAL ENERGY... AND TARIFFS Transmission Infrastructure Investment Provisions § 35.35 Transmission infrastructure investment. (a) Purpose. This section establishes rules for incentive-based (including performance-based...

  5. Cyberwarfare on the Electricity Infrastructure

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Murarka, N.; Ramesh, V.C.

    2000-03-20

    The report analyzes the possibility of cyberwarfare on the electricity infrastructure. The ongoing deregulation of the electricity industry makes the power grid all the more vulnerable to cyber attacks. The report models the power system information system components, models potential threats and protective measures. It therefore offers a framework for infrastructure protection.

  6. Alternative Fuels Data Center: Electric Vehicle Infrastructure Projection

    Science.gov Websites

    Tool (EVI-Pro) Lite Electric Vehicle Infrastructure Projection Tool (EVI-Pro) Lite to someone by E-mail Share Alternative Fuels Data Center: Electric Vehicle Infrastructure Projection Tool (EVI -Pro) Lite on Facebook Tweet about Alternative Fuels Data Center: Electric Vehicle Infrastructure

  7. Transmission Infrastructure | Energy Analysis | NREL

    Science.gov Websites

    aggregating geothermal with other complementary generating technologies, in renewable energy zones infrastructure planning and expansion to enable large-scale deployment of renewable energy in the future. Large Energy, FERC, NERC, and the regional entities, transmission providers, generating companies, utilities

  8. Complex Dynamics of the Power Transmission Grid (and other Critical Infrastructures)

    NASA Astrophysics Data System (ADS)

    Newman, David

    2015-03-01

    Our modern societies depend crucially on a web of complex critical infrastructures such as power transmission networks, communication systems, transportation networks and many others. These infrastructure systems display a great number of the characteristic properties of complex systems. Important among these characteristics, they exhibit infrequent large cascading failures that often obey a power law distribution in their probability versus size. This power law behavior suggests that conventional risk analysis does not apply to these systems. It is thought that much of this behavior comes from the dynamical evolution of the system as it ages, is repaired, upgraded, and as the operational rules evolve with human decision making playing an important role in the dynamics. In this talk, infrastructure systems as complex dynamical systems will be introduced and some of their properties explored. The majority of the talk will then be focused on the electric power transmission grid though many of the results can be easily applied to other infrastructures. General properties of the grid will be discussed and results from a dynamical complex systems power transmission model will be compared with real world data. Then we will look at a variety of uses of this type of model. As examples, we will discuss the impact of size and network homogeneity on the grid robustness, the change in risk of failure as generation mix (more distributed vs centralized for example) changes, as well as the effect of operational changes such as the changing the operational risk aversion or grid upgrade strategies. One of the important outcomes from this work is the realization that ``improvements'' in the system components and operational efficiency do not always improve the system robustness, and can in fact greatly increase the risk, when measured as a risk of large failure.

  9. State Transmission Infrastructure Authorities: The Story So Far; December 2007 - December 2008

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Porter, K.; Fink. S.

    2008-05-01

    This report examines the status and future direction of state transmission infrastructure authorities. It summarizes common characteristics, discusses current transmission projects, and outlines common issues the state infrastructure authorities have faced.

  10. Testing Realistic Disaster Scenarios for Space Weather: The Economic Impacts of Electricity Transmission Infrastructure Failure in the UK

    NASA Astrophysics Data System (ADS)

    Gibbs, M.; Oughton, E. J.; Hapgood, M. A.

    2017-12-01

    The socio-economic impacts of space weather have been under-researched, despite this threat featuring on the UK's National Risk Register. In this paper, a range of Realistic Disaster Scenarios due to failure in electricity transmission infrastructure are tested. We use regional Geomagnetically Induced Current (GIC) studies to identify areas in the UK high-voltage power system deemed to be high-risk. The potential level of disruption arising from a large geomagnetic disturbance in these `hot spots' on local economic activity is explored. Electricity is a necessary factor of production without which businesses cannot operate, so even short term power loss can cause significant loss of value. We utilise a spatially disaggregated approach that focuses on quantifying employment disruption by industrial sector, and relating this to direct Gross Value Added loss. We then aggregate this direct loss into a set of shocks to undertake macroeconomic modelling of different scenarios, to obtain the total economic impact which includes both direct and indirect supply chain disruption effects. These results are reported for a range of temporal periods, with the minimum increment being a one-hour blackout. This work furthers our understanding of the economic impacts of space weather, and can inform future reviews of the UK's National Risk Register. The key contribution of the paper is that the results can be used in the future cost-benefit analysis of investment in space weather forecasting.

  11. UAV Inspection of Electrical Transmission Infrastructure with Path Conformance Autonomy and Lidar-Based Geofences NASA Report on UTM Reference Mission Flights at Southern Company Flights November 2016

    NASA Technical Reports Server (NTRS)

    Moore, Andrew J.; Schubert, Matthew; Rymer, Nicholas; Balachandran, Swee; Consiglio, Maria; Munoz, Cesar; Smith, Joshua; Lewis, Dexter; Schneider, Paul

    2017-01-01

    Flights at low altitudes in close proximity to electrical transmission infrastructure present serious navigational challenges: GPS and radio communication quality is variable and yet tight position control is needed to measure defects while avoiding collisions with ground structures. To advance unmanned aerial vehicle (UAV) navigation technology while accomplishing a task with economic and societal benefit, a high voltage electrical infrastructure inspection reference mission was designed. An integrated air-ground platform was developed for this mission and tested in two days of experimental flights to determine whether navigational augmentation was needed to successfully conduct a controlled inspection experiment. The airborne component of the platform was a multirotor UAV built from commercial off-the-shelf hardware and software, and the ground component was a commercial laptop running open source software. A compact ultraviolet sensor mounted on the UAV can locate 'hot spots' (potential failure points in the electric grid), so long as the UAV flight path adequately samples the airspace near the power grid structures. To improve navigation, the platform was supplemented with two navigation technologies: lidar-to-polyhedron preflight processing for obstacle demarcation and inspection distance planning, and trajectory management software to enforce inspection standoff distance. Both navigation technologies were essential to obtaining useful results from the hot spot sensor in this obstacle-rich, low-altitude airspace. Because the electrical grid extends into crowded airspaces, the UAV position was tracked with NASA unmanned aerial system traffic management (UTM) technology. The following results were obtained: (1) Inspection of high-voltage electrical transmission infrastructure to locate 'hot spots' of ultraviolet emission requires navigation methods that are not broadly available and are not needed at higher altitude flights above ground structures. (2) The

  12. Critical Infrastructure Protection: EMP Impacts on the U.S. Electric Grid

    NASA Astrophysics Data System (ADS)

    Boston, Edwin J., Jr.

    The purpose of this research is to identify the United States electric grid infrastructure systems vulnerabilities to electromagnetic pulse attacks and the cyber-based impacts of those vulnerabilities to the electric grid. Additionally, the research identifies multiple defensive strategies designed to harden the electric grid against electromagnetic pulse attack that include prevention, mitigation and recovery postures. Research results confirm the importance of the electric grid to the United States critical infrastructures system and that an electromagnetic pulse attack against the electric grid could result in electric grid degradation, critical infrastructure(s) damage and the potential for societal collapse. The conclusions of this research indicate that while an electromagnetic pulse attack against the United States electric grid could have catastrophic impacts on American society, there are currently many defensive strategies under consideration designed to prevent, mitigate and or recover from an electromagnetic pulse attack. However, additional research is essential to further identify future target hardening opportunities, efficient implementation strategies and funding resources.

  13. Impact of public electric vehicle charging infrastructure

    DOE PAGES

    Levinson, Rebecca S.; West, Todd H.

    2017-10-16

    Our work uses market analysis and simulation to explore the potential of public charging infrastructure to spur US battery electric vehicle (BEV) sales, increase national electrified mileage, and lower greenhouse gas (GHG) emissions. By employing both scenario and parametric analysis for policy driven injection of public charging stations we find the following: (1) For large deployments of public chargers, DC fast chargers are more effective than level 2 chargers at increasing BEV sales, increasing electrified mileage, and lowering GHG emissions, even if only one DC fast charging station can be built for every ten level 2 charging stations. (2) Amore » national initiative to build DC fast charging infrastructure will see diminishing returns on investment at approximately 30,000 stations. (3) Some infrastructure deployment costs can be defrayed by passing them back to electric vehicle consumers, but once those costs to the consumer reach the equivalent of approximately 12¢/kWh for all miles driven, almost all gains to BEV sales and GHG emissions reductions from infrastructure construction are lost.« less

  14. Impact of public electric vehicle charging infrastructure

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Levinson, Rebecca S.; West, Todd H.

    Our work uses market analysis and simulation to explore the potential of public charging infrastructure to spur US battery electric vehicle (BEV) sales, increase national electrified mileage, and lower greenhouse gas (GHG) emissions. By employing both scenario and parametric analysis for policy driven injection of public charging stations we find the following: (1) For large deployments of public chargers, DC fast chargers are more effective than level 2 chargers at increasing BEV sales, increasing electrified mileage, and lowering GHG emissions, even if only one DC fast charging station can be built for every ten level 2 charging stations. (2) Amore » national initiative to build DC fast charging infrastructure will see diminishing returns on investment at approximately 30,000 stations. (3) Some infrastructure deployment costs can be defrayed by passing them back to electric vehicle consumers, but once those costs to the consumer reach the equivalent of approximately 12¢/kWh for all miles driven, almost all gains to BEV sales and GHG emissions reductions from infrastructure construction are lost.« less

  15. Coordinated Scheduling for Interdependent Electric Power and Natural Gas Infrastructures

    DOE PAGES

    Zlotnik, Anatoly; Roald, Line; Backhaus, Scott; ...

    2016-03-24

    The extensive installation of gas-fired power plants in many parts of the world has led electric systems to depend heavily on reliable gas supplies. The use of gas-fired generators for peak load and reserve provision causes high intraday variability in withdrawals from high-pressure gas transmission systems. Such variability can lead to gas price fluctuations and supply disruptions that affect electric generator dispatch, electricity prices, and threaten the security of power systems and gas pipelines. These infrastructures function on vastly different spatio-temporal scales, which prevents current practices for separate operations and market clearing from being coordinated. Here in this article, wemore » apply new techniques for control of dynamic gas flows on pipeline networks to examine day-ahead scheduling of electric generator dispatch and gas compressor operation for different levels of integration, spanning from separate forecasting, and simulation to combined optimal control. We formulate multiple coordination scenarios and develop tractable physically accurate computational implementations. These scenarios are compared using an integrated model of test networks for power and gas systems with 24 nodes and 24 pipes, respectively, which are coupled through gas-fired generators. The analysis quantifies the economic efficiency and security benefits of gas-electric coordination and dynamic gas system operation.« less

  16. Electrical transmission line diametrical retainer

    DOEpatents

    Hall, David R.; Hall, Jr., H. Tracy; Pixton, David; Dahlgren, Scott; Sneddon, Cameron; Briscoe, Michael; Fox, Joe

    2004-12-14

    The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within down hole components. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to with stand the tension and compression of drill pipe during routine drilling cycles.

  17. Energy Transmission and Infrastructure

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mathison, Jane

    2012-12-31

    The objective of Energy Transmission and Infrastructure Northern Ohio (OH) was to lay the conceptual and analytical foundation for an energy economy in northern Ohio that will: • improve the efficiency with which energy is used in the residential, commercial, industrial, agricultural, and transportation sectors for Oberlin, Ohio as a district-wide model for Congressional District OH-09; • identify the potential to deploy wind and solar technologies and the most effective configuration for the regional energy system (i.e., the ratio of distributed or centralized power generation); • analyze the potential within the district to utilize farm wastes to produce biofuels; •more » enhance long-term energy security by identifying ways to deploy local resources and building Ohio-based enterprises; • identify the policy, regulatory, and financial barriers impeding development of a new energy system; and • improve energy infrastructure within Congressional District OH-09. This objective of laying the foundation for a renewable energy system in Ohio was achieved through four primary areas of activity: 1. district-wide energy infrastructure assessments and alternative-energy transmission studies; 2. energy infrastructure improvement projects undertaken by American Municipal Power (AMP) affiliates in the northern Ohio communities of Elmore, Oak Harbor, and Wellington; 3. Oberlin, OH-area energy assessment initiatives; and 4. a district-wide conference held in September 2011 to disseminate year-one findings. The grant supported 17 research studies by leading energy, policy, and financial specialists, including studies on: current energy use in the district and the Oberlin area; regional potential for energy generation from renewable sources such as solar power, wind, and farm-waste; energy and transportation strategies for transitioning the City of Oberlin entirely to renewable resources and considering pedestrians, bicyclists, and public transportation as well as

  18. Uganda's National Transmission Backbone Infrastructure Project: Technical Challenges and the Way Forward

    NASA Astrophysics Data System (ADS)

    Bulega, T.; Kyeyune, A.; Onek, P.; Sseguya, R.; Mbabazi, D.; Katwiremu, E.

    2011-10-01

    Several publications have identified technical challenges facing Uganda's National Transmission Backbone Infrastructure project. This research addresses the technical limitations of the National Transmission Backbone Infrastructure project, evaluates the goals of the project, and compares the results against the technical capability of the backbone. The findings of the study indicate a bandwidth deficit, which will be addressed by using dense wave division multiplexing repeaters, leasing bandwidth from private companies. Microwave links for redundancy, a Network Operation Center for operation and maintenance, and deployment of wireless interoperability for microwave access as a last-mile solution are also suggested.

  19. Electrical Transmission Line Diametrical Retention Mechanism

    DOEpatents

    Hall, David R.; Hall, Jr., H. Tracy; Pixton, David; Dahlgren, Scott; Sneddon, Cameron; Briscoe, Michael; Fox, Joe

    2006-01-03

    The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within downhole components. The invention allows a transmission line to be attached to the internal diameter of drilling components that have a substantially uniform drilling diameter. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string, drill collars, heavy weight drill pipe, and jars. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to withstand the tension and compression of drill pipe during routine drilling cycles.

  20. California Plug-In Electric Vehicle Infrastructure Projections: 2017-2025 - Future Infrastructure Needs for Reaching the State's Zero Emission-Vehicle Deployment Goals

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wood, Eric W; Rames, Clement L; Bedir, Abdulkadir

    This report analyzes plug-in electric vehicle (PEV) infrastructure needs in California from 2017 to 2025 in a scenario where the State's zero-emission vehicle (ZEV) deployment goals are achieved by household vehicles. The statewide infrastructure needs are evaluated by using the Electric Vehicle Infrastructure Projection tool, which incorporates representative statewide travel data from the 2012 California Household Travel Survey. The infrastructure solution presented in this assessment addresses two primary objectives: (1) enabling travel for battery electric vehicles and (2) maximizing the electric vehicle-miles traveled for plug-in hybrid electric vehicles. The analysis is performed at the county-level for each year between 2017more » and 2025 while considering potential technology improvements. The results from this study present an infrastructure solution that can facilitate market growth for PEVs to reach the State's ZEV goals by 2025. The overall results show a need for 99k-130k destination chargers, including workplaces and public locations, and 9k-25k fast chargers. The results also show a need for dedicated or shared residential charging solutions at multi-family dwellings, which are expected to host about 120k PEVs by 2025. An improvement to the scientific literature, this analysis presents the significance of infrastructure reliability and accessibility on the quantification of charger demand.« less

  1. The potential of electricity transmission corridors in forested areas as bumblebee habitat.

    PubMed

    Hill, Bruce; Bartomeus, Ignasi

    2016-11-01

    Declines in pollinator abundance and diversity are not only a conservation issue, but also a threat to crop pollination. Maintained infrastructure corridors, such as those containing electricity transmission lines, are potentially important wild pollinator habitat. However, there is a lack of evidence comparing the abundance and diversity of wild pollinators in transmission corridors with other important pollinator habitats. We compared the diversity of a key pollinator group, bumblebees ( Bombus spp.), between transmission corridors and the surrounding semi-natural and managed habitat types at 10 sites across Sweden's Uppland region. Our results show that transmission corridors have no impact on bumblebee diversity in the surrounding area. However, transmission corridors and other maintained habitats such as roadsides have a level of bumblebee abundance and diversity comparable to semi-natural grasslands and host species that are important for conservation and ecosystem service provision. Under the current management regime, transmission corridors already provide valuable bumblebee habitat, but given that host plant density is the main determinant of bumblebee abundance, these areas could potentially be enhanced by establishing and maintaining key host plants. We show that in northern temperate regions the maintenance of transmission corridors has the potential to contribute to bumblebee conservation and the ecosystem services they provide.

  2. The potential of electricity transmission corridors in forested areas as bumblebee habitat

    PubMed Central

    Hill, Bruce

    2016-01-01

    Declines in pollinator abundance and diversity are not only a conservation issue, but also a threat to crop pollination. Maintained infrastructure corridors, such as those containing electricity transmission lines, are potentially important wild pollinator habitat. However, there is a lack of evidence comparing the abundance and diversity of wild pollinators in transmission corridors with other important pollinator habitats. We compared the diversity of a key pollinator group, bumblebees (Bombus spp.), between transmission corridors and the surrounding semi-natural and managed habitat types at 10 sites across Sweden's Uppland region. Our results show that transmission corridors have no impact on bumblebee diversity in the surrounding area. However, transmission corridors and other maintained habitats such as roadsides have a level of bumblebee abundance and diversity comparable to semi-natural grasslands and host species that are important for conservation and ecosystem service provision. Under the current management regime, transmission corridors already provide valuable bumblebee habitat, but given that host plant density is the main determinant of bumblebee abundance, these areas could potentially be enhanced by establishing and maintaining key host plants. We show that in northern temperate regions the maintenance of transmission corridors has the potential to contribute to bumblebee conservation and the ecosystem services they provide. PMID:28018640

  3. Rogue wave in coupled electric transmission line

    NASA Astrophysics Data System (ADS)

    Duan, J. K.; Bai, Y. L.

    2018-03-01

    Distributed electrical transmission lines that consist of a large number of identical sections have been theoretically studied in the present paper. The rogue wave is analyzed and predicted using the nonlinear Schrodinger equation (NLSE). The results indicate that, in the continuum limit, the voltage for the transmission line is described in some cases by the NLSE that is obtained using the traditional perturbation technique. The dependences of the characteristics of the rouge wave parameters on the coupled electric transmission line are shown in the paper. As is well known, rogue waves can be found for a large number of oceanic disasters, and such waves may be disastrous. However, the results of the present paper for coupled electric transmission lines may be useful.

  4. National Plug-In Electric Vehicle Infrastructure Analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wood, Eric W.; Rames, Clement L.; Muratori, Matteo

    This document describes a study conducted by the National Renewable Energy Laboratory quantifying the charging station infrastructure required to serve the growing U.S. fleet of plug-in electric vehicles (PEVs). PEV sales, which include plug-in hybrid electric vehicles (PHEVs) and battery electric vehicles (BEVs), have surged recently. Most PEV charging occurs at home, but widespread PEV adoption will require the development of a national network of non-residential charging stations. Installation of these stations strategically would maximize the economic viability of early stations while enabling efficient network growth as the PEV market matures. This document describes what effective co-evolution of the PEVmore » fleet and charging infrastructure might look like under a range of scenarios. To develop the roadmap, NREL analyzed PEV charging requirements along interstate corridors and within urban and rural communities. The results suggest that a few hundred corridor fast-charging stations could enable long-distance BEV travel between U.S. cities. Compared to interstate corridors, urban and rural communities are expected to have significantly larger charging infrastructure requirements. About 8,000 fast-charging stations would be required to provide a minimum level of coverage nationwide. In an expanding PEV market, the total number of non-residential charging outlets or 'plugs' required to meet demand ranges from around 100,000 to more than 1.2 million. Understanding what drives this large range in capacity requirements is critical. For example, whether consumers prefer long-range or short-range PEVs has a larger effect on plug requirements than does the total number of PEVs on the road. The relative success of PHEVs versus BEVs also has a major impact, as does the number of PHEVs that charge away from home. This study shows how important it is to understand consumer preferences and driving behaviors when planning charging networks.« less

  5. National Plug-In Electric Vehicle Infrastructure Analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Muratori, Matteo; Rames, Clement L; Srinivasa Raghavan, Sesha

    This presentation describes a study conducted by the National Renewable Energy Laboratory quantifying the charging station infrastructure required to serve the growing U.S. fleet of plug-in electric vehicles (PEVs). PEV sales, which include plug-in hybrid electric vehicles (PHEVs) and battery electric vehicles (BEVs), have surged recently. Most PEV charging occurs at home, but widespread PEV adoption will require the development of a national network of non-residential charging stations. Installation of these stations strategically would maximize the economic viability of early stations while enabling efficient network growth as the PEV market matures. This document describes what effective co-evolution of the PEVmore » fleet and charging infrastructure might look like under a range of scenarios. To develop the roadmap, NREL analyzed PEV charging requirements along interstate corridors and within urban and rural communities. The results suggest that a few hundred corridor fast-charging stations could enable long-distance BEV travel between U.S. cities. Compared to interstate corridors, urban and rural communities are expected to have significantly larger charging infrastructure requirements. About 8,000 fast-charging stations would be required to provide a minimum level of coverage nationwide. In an expanding PEV market, the total number of non-residential charging outlets or 'plugs' required to meet demand ranges from around 100,000 to more than 1.2 million. Understanding what drives this large range in capacity requirements is critical. For example, whether consumers prefer long-range or short-range PEVs has a larger effect on plug requirements than does the total number of PEVs on the road. The relative success of PHEVs versus BEVs also has a major impact, as does the number of PHEVs that charge away from home. This study shows how important it is to understand consumer preferences and driving behaviors when planning charging networks.« less

  6. 77 FR 3958 - Coordination of Federal Authorizations for Electric Transmission Facilities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-26

    ... Coordination of Federal Authorizations for Electric Transmission Facilities AGENCY: Office of Electricity... coordination of Federal Authorizations for Electric Transmission Facilities has been extended until February 27... authorizations for proposed interstate electric transmission facilities pursuant to section 216(h) of the Federal...

  7. Design of synchromesh mechanism to optimization manual transmission's electric vehicle

    NASA Astrophysics Data System (ADS)

    Zainuri, Fuad; Sumarsono, Danardono A.; Adhitya, Muhammad; Siregar, Rolan

    2017-03-01

    Significant research has been attempted on a vehicle that lead to the development of transmission that can reduce energy consumption and improve vehicle efficiency. Consumers also expect safety, convenience, and competitive prices. Automatic transmission (AT), continuously variable transmission (CVT), and dual clutch transmission (DCT) is the latest transmission developed for road vehicle. From literature reviews that have been done that this transmission is less effective on electric cars which use batteries as a power source compared to type manual transmission, this is due to the large power losses when making gear changes. Zeroshift system is the transmission can do shift gears with no time (zero time). It was developed for the automatic manual transmission, and this transmission has been used on racing vehicles to eliminate deceleration when gear shift. Zeroshift transmission still use the clutch to change gear in which electromechanical be used to replace the clutch pedal. Therefore, the transmission is too complex for the transmission of electric vehicles, but its mechanism is considered very suitable to increase the transmission efficiency. From this idea, a new innovation design transmission will be created to electric car. The combination synchromesh with zeroshift mechanism for the manual transmission is a transmission that is ideal for improving the transmission efficiency. Installation synchromesh on zeroshift mechanism is expected to replace the function of the clutch MT, and assisted with the motor torque setting when to change gear. Additionally to consider is the weight of the transmission, ease of manufacturing, ease of installation with an electric motor, as well as ease of use by drivers is a matter that must be done to obtain a new transmission system that is suitable for electric cars.

  8. Onsite and Electric Backup Capabilities at Critical Infrastructure Facilities in the United States

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Phillips, Julia A.; Wallace, Kelly E.; Kudo, Terence Y.

    2016-04-01

    The following analysis, conducted by Argonne National Laboratory’s (Argonne’s) Risk and Infrastructure Science Center (RISC), details an analysis of electric power backup of national critical infrastructure as captured through the Department of Homeland Security’s (DHS’s) Enhanced Critical Infrastructure Program (ECIP) Initiative. Between January 1, 2011, and September 2014, 3,174 ECIP facility surveys have been conducted. This study focused first on backup capabilities by infrastructure type and then expanded to infrastructure type by census region.

  9. Hemichannel composition and electrical synaptic transmission: molecular diversity and its implications for electrical rectification

    PubMed Central

    Palacios-Prado, Nicolás; Huetteroth, Wolf; Pereda, Alberto E.

    2014-01-01

    Unapposed hemichannels (HCs) formed by hexamers of gap junction proteins are now known to be involved in various cellular processes under both physiological and pathological conditions. On the other hand, less is known regarding how differences in the molecular composition of HCs impact electrical synaptic transmission between neurons when they form intercellular heterotypic gap junctions (GJs). Here we review data indicating that molecular differences between apposed HCs at electrical synapses are generally associated with rectification of electrical transmission. Furthermore, this association has been observed at both innexin and connexin (Cx) based electrical synapses. We discuss the possible molecular mechanisms underlying electrical rectification, as well as the potential contribution of intracellular soluble factors to this phenomenon. We conclude that asymmetries in molecular composition and sensitivity to cellular factors of each contributing hemichannel can profoundly influence the transmission of electrical signals, endowing electrical synapses with more complex functional properties. PMID:25360082

  10. Effect of presynaptic membrane potential on electrical vs. chemical synaptic transmission

    PubMed Central

    Evans, Colin G.; Ludwar, Bjoern Ch.; Kang, Timothy

    2011-01-01

    The growing realization that electrical coupling is present in the mammalian brain has sparked renewed interest in determining its functional significance and contrasting it with chemical transmission. One question of interest is whether the two types of transmission can be selectively regulated, e.g., if a cell makes both types of connections can electrical transmission occur in the absence of chemical transmission? We explore this issue in an experimentally advantageous preparation. B21, the neuron we study, is an Aplysia sensory neuron involved in feeding that makes electrical and chemical connections with other identified cells. Previously we demonstrated that chemical synaptic transmission is membrane potential dependent. It occurs when B21 is centrally depolarized prior to and during peripheral activation, but does not occur if B21 is peripherally activated at its resting membrane potential. In this article we study effects of membrane potential on electrical transmission. We demonstrate that maximal potentiation occurs in different voltage ranges for the two types of transmission, with potentiation of electrical transmission occurring at more hyperpolarized potentials (i.e., requiring less central depolarization). Furthermore, we describe a physiologically relevant type of stimulus that induces both spiking and an envelope of depolarization in the somatic region of B21. This depolarization does not induce functional chemical synaptic transmission but is comparable to the depolarization needed to maximally potentiate electrical transmission. In this study we therefore characterize a situation in which electrical and chemical transmission can be selectively controlled by membrane potential. PMID:21593394

  11. Regional Charging Infrastructure for Plug-In Electric Vehicles: A Case Study of Massachusetts

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wood, Eric; Raghavan, Sesha; Rames, Clement

    Given the complex issues associated with plug-in electric vehicle (PEV) charging and options in deploying charging infrastructure, there is interest in exploring scenarios of future charging infrastructure deployment to provide insight and guidance to national and regional stakeholders. The complexity and cost of PEV charging infrastructure pose challenges to decision makers, including individuals, communities, and companies considering infrastructure installations. The value of PEVs to consumers and fleet operators can be increased with well-planned and cost-effective deployment of charging infrastructure. This will increase the number of miles driven electrically and accelerate PEV market penetration, increasing the shared value of charging networksmore » to an expanding consumer base. Given these complexities and challenges, the objective of the present study is to provide additional insight into the role of charging infrastructure in accelerating PEV market growth. To that end, existing studies on PEV infrastructure are summarized in a literature review. Next, an analysis of current markets is conducted with a focus on correlations between PEV adoption and public charging availability. A forward-looking case study is then conducted focused on supporting 300,000 PEVs by 2025 in Massachusetts. The report concludes with a discussion of potential methodology for estimating economic impacts of PEV infrastructure growth.« less

  12. Short-term electric power demand forecasting based on economic-electricity transmission model

    NASA Astrophysics Data System (ADS)

    Li, Wenfeng; Bai, Hongkun; Liu, Wei; Liu, Yongmin; Wang, Yubin Mao; Wang, Jiangbo; He, Dandan

    2018-04-01

    Short-term electricity demand forecasting is the basic work to ensure safe operation of the power system. In this paper, a practical economic electricity transmission model (EETM) is built. With the intelligent adaptive modeling capabilities of Prognoz Platform 7.2, the econometric model consists of three industrial added value and income levels is firstly built, the electricity demand transmission model is also built. By multiple regression, moving averages and seasonal decomposition, the problem of multiple correlations between variables is effectively overcome in EETM. The validity of EETM is proved by comparison with the actual value of Henan Province. Finally, EETM model is used to forecast the electricity consumption of the 1-4 quarter of 2018.

  13. Unbundled infrastructure firms: Competition and continuing regulation

    NASA Astrophysics Data System (ADS)

    Hogendorn, Christiaan Paul

    Unbundled infrastructure firms provide conduits for electricity transmission, residential communications, etc. but are vertically disintegrated from "content" functions such as electricity generation or world-wide-web pages. These conduits are being deregulated, and this dissertation examines whether the deregulated conduits will behave in an efficient and competitive manner. The dissertation presents three essays, each of which develops a theoretical model of the behavior of conduit firms in a market environment. The first essay considers the prospects for competition between multiple conduits in the emerging market for broadband (high-speed) residential Internet access. It finds that such competition is likely to emerge as demand for these services increase. The second essay shows how a monopoly electricity or natural gas transmission conduit can facilitate collusion between suppliers of the good. It shows that this is an inefficient effect of standard price-cap regulation. The third essay considers the supply chain of residential Internet access and evaluates proposed "open access" regulation that would allow more than one firm to serve customers over the same physical infrastructure. It shows that the amount of content available to consumers does not necessarily increase under open access.

  14. Electricity Transmission, Pipelines, and National Trails. An Analysis of Current and Potential Intersections on Federal Lands in the Eastern United States, Alaska, and Hawaii

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kuiper, James A; Krummel, John R; Hlava, Kevin J

    2014-03-25

    As has been noted in many reports and publications, acquiring new or expanded rights-of-way for transmission is a challenging process, because numerous land use and land ownership constraints must be overcome to develop pathways suitable for energy transmission infrastructure. In the eastern U.S., more than twenty federally protected national trails (some of which are thousands of miles long, and cross many states) pose a potential obstacle to the development of new or expanded electricity transmission capacity. However, the scope of this potential problem is not well-documented, and there is no baseline information available that could allow all stakeholders to studymore » routing scenarios that could mitigate impacts on national trails. This report, Electricity Transmission, Pipelines, and National Trails: An Analysis of Current and Potential Intersections on Federal Lands in the Eastern United States, was prepared by the Environmental Science Division of Argonne National Laboratory (Argonne). Argonne was tasked by DOE to analyze the “footprint” of the current network of National Historic and Scenic Trails and the electricity transmission system in the 37 eastern contiguous states, Alaska, and Hawaii; assess the extent to which national trails are affected by electrical transmission; and investigate the extent to which national trails and other sensitive land use types may be affected in the near future by planned transmission lines. Pipelines are secondary to transmission lines for analysis, but are also within the analysis scope in connection with the overall directives of Section 368 of the Energy Policy Act of 2005, and because of the potential for electrical transmission lines being collocated with pipelines. Based on Platts electrical transmission line data, a total of 101 existing intersections with national trails on federal land were found, and 20 proposed intersections. Transmission lines and pipelines are proposed in Alaska; however there are no

  15. Electrical and Biological Effects of Transmission Lines: A Review.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lee, Jack M.

    1989-06-01

    This review describes the electrical properties of a-c and d-c transmission lines and the resulting effects on plants, animals, and people. Methods used by BPA to mitigate undesirable effects are also discussed. Although much of the information in this review pertains to high-voltage transmission lines, information on distribution lines and electrical appliances is included. The electrical properties discussed are electric and magnetic fields and corona: first for alternating-current (a-c) lines, then for direct current (d-c).

  16. Electricity Transmission, Pipelines, and National Trails: An Analysis of Current and Potential Intersections on Federal Lands in the Eastern United States, Alaska, and Hawaii

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kuiper, James A.; Krummel, John R.; Hlava, Kevin J.

    As has been noted in many reports and publications, acquiring new or expanded rights-of-way for transmission is a challenging process, because numerous land use and land ownership constraints must be overcome to develop pathways suitable for energy transmission infrastructure. In the eastern U.S., more than twenty federally protected national trails (some of which are thousands of miles long, and cross many states) pose a potential obstacle to the development of new or expanded electricity transmission capacity. However, the scope of this potential problem is not well-documented, and there is no baseline information available that could allow all stakeholders to studymore » routing scenarios that could mitigate impacts on national trails. This report, Electricity Transmission, Pipelines, and National Trails: An Analysis of Current and Potential Intersections on Federal Lands in the Eastern United States, was prepared by the Environmental Science Division of Argonne National Laboratory (Argonne). Argonne was tasked by DOE to analyze the “footprint” of the current network of National Historic and Scenic Trails and the electricity transmission system in the 37 eastern contiguous states, Alaska, and Hawaii; assess the extent to which national trails are affected by electrical transmission; and investigate the extent to which national trails and other sensitive land use types may be affected in the near future by planned transmission lines. Pipelines are secondary to transmission lines for analysis, but are also within the analysis scope in connection with the overall directives of Section 368 of the Energy Policy Act of 2005, and because of the potential for electrical transmission lines being collocated with pipelines.« less

  17. Operation and planning of coordinated natural gas and electricity infrastructures

    NASA Astrophysics Data System (ADS)

    Zhang, Xiaping

    Natural gas is becoming rapidly the optimal choice for fueling new generating units in electric power system driven by abundant natural gas supplies and environmental regulations that are expected to cause coal-fired generation retirements. The growing reliance on natural gas as a dominant fuel for electricity generation throughout North America has brought the interaction between the natural gas and power grids into sharp focus. The primary concern and motivation of this research is to address the emerging interdependency issues faced by the electric power and natural gas industry. This thesis provides a comprehensive analysis of the interactions between the two systems regarding the short-term operation and long-term infrastructure planning. Natural gas and renewable energy appear complementary in many respects regarding fuel price and availability, environmental impact, resource distribution and dispatchability. In addition, demand response has also held the promise of making a significant contribution to enhance system operations by providing incentives to customers for a more flat load profile. We investigated the coordination between natural gas-fired generation and prevailing nontraditional resources including renewable energy, demand response so as to provide economical options for optimizing the short-term scheduling with the intense natural gas delivery constraints. As the amount and dispatch of gas-fired generation increases, the long-term interdependency issue is whether there is adequate pipeline capacity to provide sufficient gas to natural gas-fired generation during the entire planning horizon while it is widely used outside the power sector. This thesis developed a co-optimization planning model by incorporating the natural gas transportation system into the multi-year resource and transmission system planning problem. This consideration would provide a more comprehensive decision for the investment and accurate assessment for system adequacy and

  18. Electricity generation and transmission planning in deregulated power markets

    NASA Astrophysics Data System (ADS)

    He, Yang

    This dissertation addresses the long-term planning of power generation and transmission facilities in a deregulated power market. Three models with increasing complexities are developed, primarily for investment decisions in generation and transmission capacity. The models are presented in a two-stage decision context where generation and transmission capacity expansion decisions are made in the first stage, while power generation and transmission service fees are decided in the second stage. Uncertainties that exist in the second stage affect the capacity expansion decisions in the first stage. The first model assumes that the electric power market is not constrained by transmission capacity limit. The second model, which includes transmission constraints, considers the interactions between generation firms and the transmission network operator. The third model assumes that the generation and transmission sectors make capacity investment decisions separately. These models result in Nash-Cournot equilibrium among the unregulated generation firms, while the regulated transmission network operator supports the competition among generation firms. Several issues in the deregulated electric power market can be studied with these models such as market powers of generation firms and transmission network operator, uncertainties of the future market, and interactions between the generation and transmission sectors. Results deduced from the developed models include (a) regulated transmission network operator will not reserve transmission capacity to gain extra profits; instead, it will make capacity expansion decisions to support the competition in the generation sector; (b) generation firms will provide more power supplies when there is more demand; (c) in the presence of future uncertainties, the generation firms will add more generation capacity if the demand in the future power market is expected to be higher; and (d) the transmission capacity invested by the

  19. A Theoretical Secure Enterprise Architecture for Multi Revenue Generating Smart Grid Sub Electric Infrastructure

    ERIC Educational Resources Information Center

    Chaudhry, Hina

    2013-01-01

    This study is a part of the smart grid initiative providing electric vehicle charging infrastructure. It is a refueling structure, an energy generating photovoltaic system and charge point electric vehicle charging station. The system will utilize advanced design and technology allowing electricity to flow from the site's normal electric service…

  20. Advanced continuously variable transmissions for electric and hybrid vehicles

    NASA Technical Reports Server (NTRS)

    Loewenthal, S. H.

    1980-01-01

    A brief survey of past and present continuously variable transmissions (CVT) which are potentially suitable for application with electric and hybrid vehicles is presented. Discussion of general transmission requirements and benefits attainable with a CVT for electric vehicle use is given. The arrangement and function of several specific CVT concepts are cited along with their current development status. Lastly, the results of preliminary design studies conducted under a NASA contract for DOE on four CVT concepts for use in advanced electric vehicles are reviewed.

  1. Infrastructure for Integration of Legacy Electrical Equipment into a Smart-Grid Using Wireless Sensor Networks.

    PubMed

    de Araújo, Paulo Régis C; Filho, Raimir Holanda; Rodrigues, Joel J P C; Oliveira, João P C M; Braga, Stephanie A

    2018-04-24

    At present, the standardisation of electrical equipment communications is on the rise. In particular, manufacturers are releasing equipment for the smart grid endowed with communication protocols such as DNP3, IEC 61850, and MODBUS. However, there are legacy equipment operating in the electricity distribution network that cannot communicate using any of these protocols. Thus, we propose an infrastructure to allow the integration of legacy electrical equipment to smart grids by using wireless sensor networks (WSNs). In this infrastructure, each legacy electrical device is connected to a sensor node, and the sink node runs a middleware that enables the integration of this device into a smart grid based on suitable communication protocols. This middleware performs tasks such as the translation of messages between the power substation control centre (PSCC) and electrical equipment in the smart grid. Moreover, the infrastructure satisfies certain requirements for communication between the electrical equipment and the PSCC, such as enhanced security, short response time, and automatic configuration. The paper’s contributions include a solution that enables electrical companies to integrate their legacy equipment into smart-grid networks relying on any of the above mentioned communication protocols. This integration will reduce the costs related to the modernisation of power substations.

  2. Infrastructure for Integration of Legacy Electrical Equipment into a Smart-Grid Using Wireless Sensor Networks

    PubMed Central

    de Araújo, Paulo Régis C.; Filho, Raimir Holanda; Oliveira, João P. C. M.; Braga, Stephanie A.

    2018-01-01

    At present, the standardisation of electrical equipment communications is on the rise. In particular, manufacturers are releasing equipment for the smart grid endowed with communication protocols such as DNP3, IEC 61850, and MODBUS. However, there are legacy equipment operating in the electricity distribution network that cannot communicate using any of these protocols. Thus, we propose an infrastructure to allow the integration of legacy electrical equipment to smart grids by using wireless sensor networks (WSNs). In this infrastructure, each legacy electrical device is connected to a sensor node, and the sink node runs a middleware that enables the integration of this device into a smart grid based on suitable communication protocols. This middleware performs tasks such as the translation of messages between the power substation control centre (PSCC) and electrical equipment in the smart grid. Moreover, the infrastructure satisfies certain requirements for communication between the electrical equipment and the PSCC, such as enhanced security, short response time, and automatic configuration. The paper’s contributions include a solution that enables electrical companies to integrate their legacy equipment into smart-grid networks relying on any of the above mentioned communication protocols. This integration will reduce the costs related to the modernisation of power substations. PMID:29695099

  3. 78 FR 4873 - Electrical Protective Equipment Standard and the Electric Power Generation, Transmission, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-23

    ..., personal protective equipment, insulating and shielding materials, and insulated tools for working on or...] Electrical Protective Equipment Standard and the Electric Power Generation, Transmission, and Distribution... the information collection requirements specified in its standards on Electrical Protective Equipment...

  4. Cost-effective electric vehicle charging infrastructure siting for Delhi

    DOE PAGES

    Sheppard, Colin J. R.; Gopal, Anand R.; Harris, Andrew; ...

    2016-06-10

    Plug-in electric vehicles (PEVs) represent a substantial opportunity for governments to reduce emissions of both air pollutants and greenhouse gases. The Government of India has set a goal of deploying 6-7 million hybrid and PEVs on Indian roads by the year 2020. The uptake of PEVs will depend on, among other factors like high cost, how effectively range anxiety is mitigated through the deployment of adequate electric vehicle charging stations (EVCS) throughout a region. The Indian Government therefore views EVCS deployment as a central part of their electric mobility mission. The plug-in electric vehicle infrastructure (PEVI) model - an agent-basedmore » simulation modeling platform - was used to explore the cost-effective siting of EVCS throughout the National Capital Territory (NCT) of Delhi, India. At 1% penetration in the passenger car fleet, or ~10 000 battery electric vehicles (BEVs), charging services can be provided to drivers for an investment of $4.4 M (or $ 440/BEV) by siting 2764 chargers throughout the NCT of Delhi with an emphasis on the more densely populated and frequented regions of the city. The majority of chargers sited by this analysis were low power, Level 1 chargers, which have the added benefit of being simpler to deploy than higher power alternatives. The amount of public infrastructure needed depends on the access that drivers have to EVCS at home, with 83% more charging capacity required to provide the same level of service to a population of drivers without home chargers compared to a scenario with home chargers. Results also depend on the battery capacity of the BEVs adopted, with approximately 60% more charging capacity needed to achieve the same level of service when vehicles are assumed to have 57 km versus 96 km of range.« less

  5. Cost-effective electric vehicle charging infrastructure siting for Delhi

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sheppard, Colin J. R.; Gopal, Anand R.; Harris, Andrew

    Plug-in electric vehicles (PEVs) represent a substantial opportunity for governments to reduce emissions of both air pollutants and greenhouse gases. The Government of India has set a goal of deploying 6-7 million hybrid and PEVs on Indian roads by the year 2020. The uptake of PEVs will depend on, among other factors like high cost, how effectively range anxiety is mitigated through the deployment of adequate electric vehicle charging stations (EVCS) throughout a region. The Indian Government therefore views EVCS deployment as a central part of their electric mobility mission. The plug-in electric vehicle infrastructure (PEVI) model - an agent-basedmore » simulation modeling platform - was used to explore the cost-effective siting of EVCS throughout the National Capital Territory (NCT) of Delhi, India. At 1% penetration in the passenger car fleet, or ~10 000 battery electric vehicles (BEVs), charging services can be provided to drivers for an investment of $4.4 M (or $ 440/BEV) by siting 2764 chargers throughout the NCT of Delhi with an emphasis on the more densely populated and frequented regions of the city. The majority of chargers sited by this analysis were low power, Level 1 chargers, which have the added benefit of being simpler to deploy than higher power alternatives. The amount of public infrastructure needed depends on the access that drivers have to EVCS at home, with 83% more charging capacity required to provide the same level of service to a population of drivers without home chargers compared to a scenario with home chargers. Results also depend on the battery capacity of the BEVs adopted, with approximately 60% more charging capacity needed to achieve the same level of service when vehicles are assumed to have 57 km versus 96 km of range.« less

  6. Cost-effective electric vehicle charging infrastructure siting for Delhi

    NASA Astrophysics Data System (ADS)

    Sheppard, Colin J. R.; Gopal, Anand R.; Harris, Andrew; Jacobson, Arne

    2016-06-01

    Plug-in electric vehicles (PEVs) represent a substantial opportunity for governments to reduce emissions of both air pollutants and greenhouse gases. The Government of India has set a goal of deploying 6-7 million hybrid and PEVs on Indian roads by the year 2020. The uptake of PEVs will depend on, among other factors like high cost, how effectively range anxiety is mitigated through the deployment of adequate electric vehicle charging stations (EVCS) throughout a region. The Indian Government therefore views EVCS deployment as a central part of their electric mobility mission. The plug-in electric vehicle infrastructure (PEVI) model—an agent-based simulation modeling platform—was used to explore the cost-effective siting of EVCS throughout the National Capital Territory (NCT) of Delhi, India. At 1% penetration in the passenger car fleet, or ˜10 000 battery electric vehicles (BEVs), charging services can be provided to drivers for an investment of 4.4 M (or 440/BEV) by siting 2764 chargers throughout the NCT of Delhi with an emphasis on the more densely populated and frequented regions of the city. The majority of chargers sited by this analysis were low power, Level 1 chargers, which have the added benefit of being simpler to deploy than higher power alternatives. The amount of public infrastructure needed depends on the access that drivers have to EVCS at home, with 83% more charging capacity required to provide the same level of service to a population of drivers without home chargers compared to a scenario with home chargers. Results also depend on the battery capacity of the BEVs adopted, with approximately 60% more charging capacity needed to achieve the same level of service when vehicles are assumed to have 57 km versus 96 km of range.

  7. Electric vehicle drive train with direct coupling transmission

    DOEpatents

    Tankersley, J.B.; Boothe, R.W.; Konrad, C.E.

    1995-04-04

    An electric vehicle drive train includes an electric motor and an associated speed sensor, a transmission operable in a speed reduction mode or a direct coupled mode, and a controller responsive to the speed sensor for operating the transmission in the speed reduction mode when the motor is below a predetermined value, and for operating the motor in the direct coupled mode when the motor speed is above a predetermined value. The controller reduces the speed of the motor, such as by regeneratively braking the motor, when changing from the speed reduction mode to the direct coupled mode. The motor speed may be increased when changing from the direct coupled mode to the speed reduction mode. The transmission is preferably a single stage planetary gearbox. 6 figures.

  8. Electric vehicle drive train with direct coupling transmission

    DOEpatents

    Tankersley, Jerome B.; Boothe, Richard W.; Konrad, Charles E.

    1995-01-01

    An electric vehicle drive train includes an electric motor and an associated speed sensor, a transmission operable in a speed reduction mode or a direct coupled mode, and a controller responsive to the speed sensor for operating the transmission in the speed reduction mode when the motor is below a predetermined value, and for operating the motor in the direct coupled mode when the motor speed is above a predetermined value. The controller reduces the speed of the motor, such as by regeneratively braking the motor, when changing from the speed reduction mode to the direct coupled mode. The motor speed may be increased when changing from the direct coupled mode to the speed reduction mode. The transmission is preferably a single stage planetary gearbox.

  9. Wildlife and electric power transmission

    USGS Publications Warehouse

    Ellis, D.H.; Goodwin, J.G.; Hunt, J.R.; Fletcher, John L.; Busnel, R.G.

    1978-01-01

    Hundreds of thousands of miles of transmission lines have been introduced into our natural environment. These lines and their corridors can be damaging or beneficial to wildlife communities depending on how they are designed, where they are placed, and when they are constructed and maintained. With the current trend toward UHV systems, new problems (associated with additional increments in audible noise, electric and magnetic force fields, etc.) must be addressed. We recommend the following areas for careful study: (1) the response of wilderness species to transmission lines and line construction and maintenance activities (2) the magnitude of bird collision and electrocution mortality, (3) the response of power corridor and power tower in habiting wildlife to laboratory and field doses of electro-chemical oxidants, corona noise, electric and magnetic fields, etc., (4) the productivity of tower inhabiting birds compared with nearby non-tower nesters, and (5) the influence of powerline corridors on mammalian and avian migration patterns. It is our hope that the questions identified in this study will help stimulate further research so that we can maximize wildlife benefits and minimize wildlife detriments.

  10. Collapse and pull - down analysis of high voltage electricity transmission towers subjected to cyclonic wind

    NASA Astrophysics Data System (ADS)

    Ahmed, Ammar; Arthur, Craig; Edwards, Mark

    2010-06-01

    Bulk electricity transmission lines are linear assets that can be very exposed to wind effects, particularly where they traverse steep topography or open coastal terrain in cyclonic regions. Interconnected nature of the lattice type towers and conductors also, present complex vulnerabilities. These relate to the direction of wind attack to the conductors and the cascading failure mechanisms in which the failure of a single tower has cascading effects on neighbouring towers. Such behaviour is exacerbated by the finely tuned nature of tower design which serves to minimize cost and reserve strength at design wind speeds. There is a clear need to better quantify the interdependent vulnerabilities of these critical infrastructure assets in the context of the severe wind hazard. This paper presents a novel methodology developed for the Critical Infrastructure Protection Modelling and Analysis (CIPMA) capability for assessing local wind speeds and the likelihood of tower failure for a range of transmission tower and conductor types. CIPMA is a program managed by the Federal Attorney-General's Department and Geoscience Australia is leading the technical development. The methodology then involves the development of heuristically derived vulnerability models that are consistent with Australian industry experience and full-scale static tower testing results, considering isolated tower loss along with three interdependent failure mechanisms to give overall likelihoods of failure.

  11. Electric Power Infrastructure Reliability and Security (EPIRS) Reseach and Development Initiative

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rick Meeker; L. Baldwin; Steinar Dale

    2010-03-31

    Power systems have become increasingly complex and face unprecedented challenges posed by population growth, climate change, national security issues, foreign energy dependence and an aging power infrastructure. Increased demand combined with increased economic and environmental constraints is forcing state, regional and national power grids to expand supply without the large safety and stability margins in generation and transmission capacity that have been the rule in the past. Deregulation, distributed generation, natural and man-made catastrophes and other causes serve to further challenge and complicate management of the electric power grid. To meet the challenges of the 21st century while also maintainingmore » system reliability, the electric power grid must effectively integrate new and advanced technologies both in the actual equipment for energy conversion, transfer and use, and in the command, control, and communication systems by which effective and efficient operation of the system is orchestrated - in essence, the 'smart grid'. This evolution calls for advances in development, integration, analysis, and deployment approaches that ultimately seek to take into account, every step of the way, the dynamic behavior of the system, capturing critical effects due to interdependencies and interaction. This approach is necessary to better mitigate the risk of blackouts and other disruptions and to improve the flexibility and capacity of the grid. Building on prior Navy and Department of Energy investments in infrastructure and resources for electric power systems research, testing, modeling, and simulation at the Florida State University (FSU) Center for Advanced Power Systems (CAPS), this project has continued an initiative aimed at assuring reliable and secure grid operation through a more complete understanding and characterization of some of the key technologies that will be important in a modern electric system, while also fulfilling an education and

  12. Transmission of the convection electric field to the inner magnetosphere

    NASA Astrophysics Data System (ADS)

    Kikuchi, T.

    2003-12-01

    Low latitude magnetometer observations revealed that the partial ring current started to develop within several minutes after the onset of growth of the polar cap potential (PCP), and decayed simultaneously with the decrease in the PCP (Hashimoto, Kikuchi and Ebihara., JGR 2002). The magnetometer observations also indicated that the DP2 ionospheric currents were driven by the convection electric field at mid latitudes as well as at high latitudes. These observational facts suggest that the ionospheric electric field plays a crucial role in driving the convection in the inner magnetosphere. A probable model for the electric field transmission should explain both the convection in the inner magnetosphere and the ionospheric currents at mid latitudes. The instantaneous transmission of the ionospheric electric field and currents from the polar ionosphere to the equator was explained by Kikuchi and Araki (JATP 1979) based on the TM0 mode in the Earth-ionosphere waveguide. In this paper, we attempt to explain the transmission of the convection electric field to the inner magnetosphere by applying the Earth-ionosphere waveguide. However, two issues remained unresolved in the paper by Kikuchi and Araki (1979). One is the excitation of the TM0 mode in the Earth-ionosphere waveguide, and the other is the attenuation under the nighttime ionospheric condition. To examine the excitation of the TM0 mode, we couple the Earth-ionosphere waveguide (transmission line) with a magnetospheric transmission line composed of a pair of field-aligned currents (e.g., R1 FACs). A fraction of the electromagnetic energy carried from the magnetosphere is transmitted into the Earth-ionosphere waveguide, although substantial energy is dissipated in the polar ionosphere intervening between the two transmission lines. The transmitted electromagnetic energy excites the TM0 mode in the Earth-ionosphere waveguide. We then evaluate the attenuation of the TM0 mode by calculating upward flow of energy

  13. Energy landscapes: Coal canals, oil pipelines, and electricity transmission wires in the mid-Atlantic, 1820--1930

    NASA Astrophysics Data System (ADS)

    Jones, Christopher F.

    2009-12-01

    Coal canals, oil pipelines, and electricity transmission wires transformed the built environment of the American mid-Atlantic region between 1820 and 1930. By transporting coal, oil, and electrons cheaply, reliably, and in great quantities, these technologies reshaped the energy choices available to mid-Atlantic residents. In particular, canals, pipelines, and wires created new energy landscapes: systems of transport infrastructure that enabled the ever-increasing consumption of fossil fuels. Energy Landscapes integrates history of technology, environmental history, and business history to provide new perspectives on how Americans began to use fossil fuels and the social implications of these practices. First, I argue that the development of transport infrastructure played critical, and underappreciated, roles in shaping social energy choices. Rather than simply responding passively to the needs of producers and consumers, canals, pipelines, and wires structured how, when, where, and in what quantities energy was used. Second, I analyze the ways fossil fuel consumption transformed the society, economy, and environment of the mid-Atlantic. I link the consumption of coal, oil, and electricity to the development of an urban and industrialized region, the transition from an organic to a mineral economy, and the creation of a society dependent on fossil fuel energy.

  14. Impact of electric vehicles on the IEEE 34 node distribution infrastructure

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jiang, Zeming; Shalalfel, Laith; Beshir, Mohammed J.

    With the growing penetration of the electric vehicles to our daily life owing to their economic and environmental benefits, there will be both opportunities and challenges to the utilities when adopting plug-in electric vehicles (PEV) to the distribution network. In this study, a thorough analysis based on real-world project is conducted to evaluate the impacts of electric vehicles infrastructure on the grid relating to system load flow, load factor, and voltage stability. IEEE 34 node test feeder was selected and tested along with different case scenarios utilizing the electrical distribution design (EDD) software to find out the potential impacts tomore » the grid.« less

  15. Impact of electric vehicles on the IEEE 34 node distribution infrastructure

    DOE PAGES

    Jiang, Zeming; Shalalfel, Laith; Beshir, Mohammed J.

    2014-10-01

    With the growing penetration of the electric vehicles to our daily life owing to their economic and environmental benefits, there will be both opportunities and challenges to the utilities when adopting plug-in electric vehicles (PEV) to the distribution network. In this study, a thorough analysis based on real-world project is conducted to evaluate the impacts of electric vehicles infrastructure on the grid relating to system load flow, load factor, and voltage stability. IEEE 34 node test feeder was selected and tested along with different case scenarios utilizing the electrical distribution design (EDD) software to find out the potential impacts tomore » the grid.« less

  16. The transmission system as main actor in electricity market development in Romania

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Petrescu, A.M.; Mihailescu, F.

    1998-07-01

    At the beginning of 1998, Romanian Electricity Authority (RENEL) was a fully integrated generation, transmission and distribution company, which managed all aspects of planning, design, and operation of Romania' s electricity sector. This form of vertically integrated organization has enabled to develop the high voltage transmission system in order to transfer electricity from the large power plants on indigenous coal (lignite) to the deficit electricity areas. An analysis based on specific characteristics of Romanian Transmission System allows the identification of a suitable model cost for transmission services evaluation. The transmission electricity tariff as a market tool has become a necessitymore » for the heterogeneous Romanian power systems from the repartition of the generation against the demand location point of view. The experience of the power system development planner shows that the most suitable model for the transmission electricity system cost assessment is the rated zones in order to reflect the geographical imbalance of generation and demand and the ability of the transmission system to accommodate this imbalance. Setting principles for the cost evaluation has to be sustained by the service evaluation on the grid nodes at the interface between transmission system and distribution system. This cost evaluation under the form of incentives for new producers has to be reconsidered year by year taking into account the evolution in time both production side and demand side. The incentives have to be addressed directly to the producers and must be strong enough to provide an efficient reliable operation of the whole power system. Transmission planners have to develop new approaches to deal with the uncertainties of the market; a combination of market forces and regulation seems to ensure the best way for the quality and security of the power system beside of the efficiency of all actors from the electricity market.« less

  17. An Agent-Based Information System for Electric Vehicle Charging Infrastructure Deployment

    DOT National Transportation Integrated Search

    2012-08-18

    The current scarcity of public charging infrastructure is one of the major barriers to mass household adoption of plug-in electric vehicles (PEVs). Although most PEV drivers can recharge their vehicles at home, the limited driving range of the vehicl...

  18. Climate Vulnerability of Hydro-power infrastructure in the Eastern African Power Pool

    NASA Astrophysics Data System (ADS)

    Sridharan, Vignesh

    2017-04-01

    At present there is around 6000 MW of installed hydropower capacity in the Eastern African power pool (EAPP)[1]. With countries aggressively planning to achieve the Sustainable development goal (SDG) of ensuring access to affordable electricity for all, a three-fold increase in hydropower capacity is expected by 2040 [1]. Most of the existing and planned infrastructure lie inside the Nile River Basin. The latest assessment report (AR 5) from the Intergovernmental Panel on Climate Change (IPCC) indicates a high level of climatic uncertainty in the Nile Basin. The Climate Moisture index (CMI) for the Eastern Nile region and the Nile Equatorial lakes varies significantly across the different General Circulation Models (GCM)[2]. Such high uncertainty casts a shadow on the plans to expand hydropower capacity, doubting whether hydropower expansion can contribute to the goal of improving access to electricity or end up as sunk investments. In this assessment, we analyze adaptation strategies for national energy systems in the Eastern African Power Pool (EAPP), which minimize the regret that could potentially arise from impacts of a changed climate. An energy systems model of the EAPP is developed representing national electricity supply infrastructure. Cross border transmission and hydropower infrastructure is defined at individual project level. The energy systems model is coupled with a water systems management model of the Nile River Basin that calculates the water availability at different hydropower infrastructures under a range of climate scenarios. The results suggest that a robust adaptation strategy consisting of investments in cross border electricity transmission infrastructure and diversifying sources of electricity supply will require additional investments of USD 4.2 billion by 2050. However, this leads to fuel and operational cost savings of up to USD 22.6 billion, depending on the climate scenario. [1] "Platts, 2016. World Electric Power Plants Database

  19. 50 CFR 29.21-8 - Electric power transmission line rights-of-way.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Electric power transmission line rights-of... General Regulations § 29.21-8 Electric power transmission line rights-of-way. By accepting a right-of-way... with the rules prescribed in the National Electric Safety Code, all Government and other telephone...

  20. 18 CFR 42.1 - Requirement that Transmission Organizations with Organized Electricity Markets Offer Long-Term...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Transmission Organizations with Organized Electricity Markets Offer Long-Term Firm Transmission Rights. 42.1... ELECTRICITY MARKETS § 42.1 Requirement that Transmission Organizations with Organized Electricity Markets... with one or more organized electricity markets (administered either by it or by another entity) to make...

  1. 18 CFR 42.1 - Requirement that Transmission Organizations with Organized Electricity Markets Offer Long-Term...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Transmission Organizations with Organized Electricity Markets Offer Long-Term Firm Transmission Rights. 42.1... ELECTRICITY MARKETS § 42.1 Requirement that Transmission Organizations with Organized Electricity Markets... with one or more organized electricity markets (administered either by it or by another entity) to make...

  2. 18 CFR 42.1 - Requirement that Transmission Organizations with Organized Electricity Markets Offer Long-Term...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Transmission Organizations with Organized Electricity Markets Offer Long-Term Firm Transmission Rights. 42.1... ELECTRICITY MARKETS § 42.1 Requirement that Transmission Organizations with Organized Electricity Markets... with one or more organized electricity markets (administered either by it or by another entity) to make...

  3. 18 CFR 42.1 - Requirement that Transmission Organizations with Organized Electricity Markets Offer Long-Term...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Transmission Organizations with Organized Electricity Markets Offer Long-Term Firm Transmission Rights. 42.1... ELECTRICITY MARKETS § 42.1 Requirement that Transmission Organizations with Organized Electricity Markets... with one or more organized electricity markets (administered either by it or by another entity) to make...

  4. 18 CFR 42.1 - Requirement that Transmission Organizations with Organized Electricity Markets Offer Long-Term...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Transmission Organizations with Organized Electricity Markets Offer Long-Term Firm Transmission Rights. 42.1... ELECTRICITY MARKETS § 42.1 Requirement that Transmission Organizations with Organized Electricity Markets... with one or more organized electricity markets (administered either by it or by another entity) to make...

  5. Electric vehicles and public charging infrastructure : impediments and opportunities for success in the United States.

    DOT National Transportation Integrated Search

    2013-07-01

    This report seeks to reach conclusions over the role that electric vehicles (EVs) and public charging : infrastructure should play in the future U.S. transportation system As demonstrated in this report, electric : vehicles are neither new nor techno...

  6. Electric Dipole Theory of Chemical Synaptic Transmission

    PubMed Central

    Wei, Ling Y.

    1968-01-01

    In this paper we propose that chemicals such as acetylcholine are electric dipoles which when oriented and arranged in a large array could produce an electric field strong enough to drive positive ions over the junction barrier of the post-synaptic membrane and thus initiate excitation or produce depolarization. This theory is able to explain a great number of facts such as cleft size, synaptic delay, nonregeneration, subthreshold integration, facilitation with repetition, and the calcium and magnesium effects. It also shows why and how acetylcholine could act as excitatory or inhibitory transmitters under different circumstances. Our conclusion is that the nature of synaptic transmission is essentially electrical, be it mediated by electrical or chemical transmitters. PMID:4296121

  7. Essays on electricity transmission investment and financial transmission rights

    NASA Astrophysics Data System (ADS)

    Shang, Wenzhuo

    The U.S. electric power industry has been going through fundamental restructuring and realignment since the 1990's. Many issues and problems have emerged during the transition, and both economists and engineers have been looking for the solutions fervently. In this dissertation, which consists primarily of three essays, we apply economics theory and techniques to the power industry and address two related issues, transmission investment and financial transmission rights (FTRs). The first essay takes the decentralized perspective and investigates the efficiency attribute of market-based transmission investment under perfect competition. We clarify, for the first time, the nature of the externality created by loop flows that causes transmission investment to be inefficient. Our findings have important implications for better understanding of transmission market design and creating incentives for efficient transmission investment. In the second essay, we define several rules for allocating transmission investment cost within the framework of cooperative game theory. These rules provide fair, stable or efficient cost allocations in theory and are good benchmarks against which the allocation mechanism in practice can be compared and improved upon. In the last essay, we make exploratory efforts in analyzing and assessing empirically the performance of the Midwest independent system operator (MISO) FTR auction market. We reveal some stylized facts about this young market and find that it is not efficient under the risk-neutrality assumption. We also point out and correct the drawbacks in previous related work and suggest about more complete empirical work in future. In all, this dissertation makes both theoretic and empirical analysis of the two hot issues related to the power industry and comes up with findings that have important implications for the development of this industry.

  8. 76 FR 75875 - Plan for Conduct of 2012 Electric Transmission Congestion Study

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-05

    ... DEPARTMENT OF ENERGY Plan for Conduct of 2012 Electric Transmission Congestion Study AGENCY... preparation of a study of electric transmission congestion pursuant to section 216(a)(1) of the Federal Power...-register at this Web site: http://energy.gov/oe/congestion-study-2012 . [[Page 75876

  9. Recovery Act-SmartGrid regional demonstration transmission and distribution (T&D) Infrastructure

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hedges, Edward T.

    This document represents the Final Technical Report for the Kansas City Power & Light Company (KCP&L) Green Impact Zone SmartGrid Demonstration Project (SGDP). The KCP&L project is partially funded by Department of Energy (DOE) Regional Smart Grid Demonstration Project cooperative agreement DE-OE0000221 in the Transmission and Distribution Infrastructure application area. This Final Technical Report summarizes the KCP&L SGDP as of April 30, 2015 and includes summaries of the project design, implementation, operations, and analysis performed as of that date.

  10. Real Option Cost Vulnerability Analysis of Electrical Infrastructure

    NASA Astrophysics Data System (ADS)

    Prime, Thomas; Knight, Phil

    2015-04-01

    Critical infrastructure such as electricity substations are vulnerable to various geo-hazards that arise from climate change. These geo-hazards range from increased vegetation growth to increased temperatures and flood inundation. Of all the identified geo-hazards, coastal flooding has the greatest impact, but to date has had a low probability of occurring. However, in the face of climate change, coastal flooding is likely to occur more often due to extreme water levels being experienced more frequently due to sea-level rise (SLR). Knowing what impact coastal flooding will have now and in the future on critical infrastructure such as electrical substations is important for long-term management. Using a flood inundation model, present day and future flood events have been simulated, from 1 in 1 year events up to 1 in 10,000 year events. The modelling makes an integrated assessment of impact by using sea-level and surge to simulate a storm tide. The geographical area the model covers is part of the Northwest UK coastline with a range of urban and rural areas. The ensemble of flood maps generated allows the identification of critical infrastructure exposed to coastal flooding. Vulnerability has be assessed using an Estimated Annual Damage (EAD) value. Sampling SLR annual probability distributions produces a projected "pathway" for SLR up to 2100. EAD is then calculated using a relationship derived from the flood model. Repeating the sampling process allows a distribution of EAD up to 2100 to be produced. These values are discounted to present day values using an appropriate discount rate. If the cost of building and maintain defences is also removed from this a Net Present Value (NPV) of building the defences can be calculated. This distribution of NPV can be used as part of a cost modelling process involving Real Options, A real option is the right but not obligation to undertake investment decisions. In terms of investment in critical infrastructure resilience this

  11. Impacts of Demand-Side Resources on Electric Transmission Planning

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hadley, Stanton W.; Sanstad, Alan H.

    2015-01-01

    Will demand resources such as energy efficiency (EE), demand response (DR), and distributed generation (DG) have an impact on electricity transmission requirements? Five drivers for transmission expansion are discussed: interconnection, reliability, economics, replacement, and policy. With that background, we review the results of a set of transmission studies that were conducted between 2010 and 2013 by electricity regulators, industry representatives, and other stakeholders in the three physical interconnections within the United States. These broad-based studies were funded by the US Department of Energy and included scenarios of reduced load growth due to EE, DR, and DG. While the studies weremore » independent and used different modeling tools and interconnect-specific assumptions, all provided valuable results and insights. However, some caveats exist. Demand resources were evaluated in conjunction with other factors, and limitations on transmission additions between scenarios made understanding the role of demand resources difficult. One study, the western study, included analyses over both 10- and 20-year planning horizons; the 10-year analysis did not show near-term reductions in transmission, but the 20-year indicated fewer transmission additions, yielding a 36percent capital cost reduction. In the eastern study the reductions in demand largely led to reductions in local generation capacity and an increased opportunity for low-cost and renewable generation to export to other regions. The Texas study evaluated generation changes due to demand, and is in the process of examining demand resource impacts on transmission.« less

  12. Medium-term electric power demand forecasting based on economic-electricity transmission model

    NASA Astrophysics Data System (ADS)

    Li, Wenfeng; Bao, Fangmin; Bai, Hongkun; Liu, Wei; Liu, Yongmin; Mao, Yubin; Wang, Jiangbo; Liu, Junhui

    2018-06-01

    Electric demand forecasting is a basic work to ensure the safe operation of power system. Based on the theories of experimental economics and econometrics, this paper introduces Prognoz Platform 7.2 intelligent adaptive modeling platform, and constructs the economic electricity transmission model that considers the economic development scenarios and the dynamic adjustment of industrial structure to predict the region's annual electricity demand, and the accurate prediction of the whole society's electricity consumption is realized. Firstly, based on the theories of experimental economics and econometrics, this dissertation attempts to find the economic indicator variables that drive the most economical growth of electricity consumption and availability, and build an annual regional macroeconomic forecast model that takes into account the dynamic adjustment of industrial structure. Secondly, it innovatively put forward the economic electricity directed conduction theory and constructed the economic power transfer function to realize the group forecast of the primary industry + rural residents living electricity consumption, urban residents living electricity, the second industry electricity consumption, the tertiary industry electricity consumption; By comparing with the actual value of economy and electricity in Henan province in 2016, the validity of EETM model is proved, and the electricity consumption of the whole province from 2017 to 2018 is predicted finally.

  13. Antidromic-rectifying gap junctions amplify chemical transmission at functionally mixed electrical-chemical synapses

    PubMed Central

    Liu, Ping; Chen, Bojun; Mailler, Roger; Wang, Zhao-Wen

    2017-01-01

    Neurons communicate through chemical synapses and electrical synapses (gap junctions). Although these two types of synapses often coexist between neurons, little is known about whether they interact, and whether any interactions between them are important to controlling synaptic strength and circuit functions. By studying chemical and electrical synapses between premotor interneurons (AVA) and downstream motor neurons (A-MNs) in the Caenorhabditis elegans escape circuit, we found that disrupting either the chemical or electrical synapses causes defective escape response. Gap junctions between AVA and A-MNs only allow antidromic current, but, curiously, disrupting them inhibits chemical transmission. In contrast, disrupting chemical synapses has no effect on the electrical coupling. These results demonstrate that gap junctions may serve as an amplifier of chemical transmission between neurons with both electrical and chemical synapses. The use of antidromic-rectifying gap junctions to amplify chemical transmission is potentially a conserved mechanism in circuit functions. PMID:28317880

  14. Renewable Energy Zone (REZ) Transmission Planning Process: A Guidebook for Practitioners

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lee, Nathan; Flores-Espino, Francisco; Hurlbut, David J.

    Achieving clean energy goals may require new investments in transmission, especially if planners anticipate economic growth and increased demand for electricity. The renewable energy zone (REZ) transmission planning process can help policymakers ensure their infrastructure investments achieve national goals in the most economical manner. Policymakers, planners, and system operators around the world have used variations of the REZ process to chart the expansion of their transmission networks and overcome the barriers of traditional transmission planning. This guidebook seeks to help power system planners, key decision makers, and stakeholders understand and use the REZ transmission planning process to integrate transmission expansionmore » planning and renewable energy generation planning.« less

  15. 29 CFR 1910.269 - Electric power generation, transmission, and distribution.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 5 2010-07-01 2010-07-01 false Electric power generation, transmission, and distribution. 1910.269 Section 1910.269 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH STANDARDS Special Industries § 1910.269 Electric power generation,...

  16. 29 CFR 1910.269 - Electric power generation, transmission, and distribution.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 5 2014-07-01 2014-07-01 false Electric power generation, transmission, and distribution. 1910.269 Section 1910.269 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH STANDARDS Special Industries § 1910.269 Electric power generation,...

  17. 29 CFR 1910.269 - Electric power generation, transmission, and distribution.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 5 2013-07-01 2013-07-01 false Electric power generation, transmission, and distribution. 1910.269 Section 1910.269 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH STANDARDS Special Industries § 1910.269 Electric power generation,...

  18. 29 CFR 1910.269 - Electric power generation, transmission, and distribution.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 5 2012-07-01 2012-07-01 false Electric power generation, transmission, and distribution. 1910.269 Section 1910.269 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH STANDARDS Special Industries § 1910.269 Electric power generation,...

  19. 29 CFR 1910.269 - Electric power generation, transmission, and distribution.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 5 2011-07-01 2011-07-01 false Electric power generation, transmission, and distribution. 1910.269 Section 1910.269 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH STANDARDS Special Industries § 1910.269 Electric power generation,...

  20. Electric Sector Integration | Energy Analysis | NREL

    Science.gov Websites

    investigates the potential impacts of expanding renewable technology deployment on grid operations and Electric System Flexibility and Storage Impacts on Conventional Generators Transmission Infrastructure Generation Our grid integration studies use state-of-the-art modeling and analysis to evaluate the impacts of

  1. Big Wind Turbines Require Infrastructure Upgrades - Continuum Magazine |

    Science.gov Websites

    rapidly. To that end, NREL has been completing electrical infrastructure upgrades to accommodate utility in the fall of 2009 necessitated infrastructure upgrades. Now the NWTC's electrical infrastructure eastern-most row on site. Interconnecting these large turbines required major electrical infrastructure

  2. Accurate modeling and inversion of electrical resistivity data in the presence of metallic infrastructure with known location and dimension

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, Timothy C.; Wellman, Dawn M.

    2015-06-26

    Electrical resistivity tomography (ERT) has been widely used in environmental applications to study processes associated with subsurface contaminants and contaminant remediation. Anthropogenic alterations in subsurface electrical conductivity associated with contamination often originate from highly industrialized areas with significant amounts of buried metallic infrastructure. The deleterious influence of such infrastructure on imaging results generally limits the utility of ERT where it might otherwise prove useful for subsurface investigation and monitoring. In this manuscript we present a method of accurately modeling the effects of buried conductive infrastructure within the forward modeling algorithm, thereby removing them from the inversion results. The method ismore » implemented in parallel using immersed interface boundary conditions, whereby the global solution is reconstructed from a series of well-conditioned partial solutions. Forward modeling accuracy is demonstrated by comparison with analytic solutions. Synthetic imaging examples are used to investigate imaging capabilities within a subsurface containing electrically conductive buried tanks, transfer piping, and well casing, using both well casings and vertical electrode arrays as current sources and potential measurement electrodes. Results show that, although accurate infrastructure modeling removes the dominating influence of buried metallic features, the presence of metallic infrastructure degrades imaging resolution compared to standard ERT imaging. However, accurate imaging results may be obtained if electrodes are appropriately located.« less

  3. Transmission Pricing Issues for Electricity Generation From Renewable Resources

    EIA Publications

    1999-01-01

    This article discusses how the resolution of transmission pricing issues which have arisen under the Federal Energy Regulatory Commission's (FERC) open access environment may affect the prospects for renewable-based electricity.

  4. A Calculation Method of Electric Distance and Subarea Division Application Based on Transmission Impedance

    NASA Astrophysics Data System (ADS)

    Fang, G. J.; Bao, H.

    2017-12-01

    The widely used method of calculating electric distances is sensitivity method. The sensitivity matrix is the result of linearization and based on the hypothesis that the active power and reactive power are decoupled, so it is inaccurate. In addition, it calculates the ratio of two partial derivatives as the relationship of two dependent variables, so there is no physical meaning. This paper presents a new method for calculating electrical distance, namely transmission impedance method. It forms power supply paths based on power flow tracing, then establishes generalized branches to calculate transmission impedances. In this paper, the target of power flow tracing is S instead of Q. Q itself has no direction and the grid delivers complex power so that S contains more electrical information than Q. By describing the power transmission relationship of the branch and drawing block diagrams in both forward and reverse directions, it can be found that the numerators of feedback parts of two block diagrams are all the transmission impedances. To ensure the distance is scalar, the absolute value of transmission impedance is defined as electrical distance. Dividing network according to the electric distances and comparing with the results of sensitivity method, it proves that the transmission impedance method can adapt to the dynamic change of system better and reach a reasonable subarea division scheme.

  5. 76 FR 44323 - National Grid Transmission Services Corporation; Bangor Hydro Electric Company; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-25

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL11-49-000] National Grid Transmission Services Corporation; Bangor Hydro Electric Company; Notice of Petition for Declaratory Order Take..., 18 CFR 385.207, National Grid Transmission Services Corporation and Bangor Hydro Electric Company...

  6. 76 FR 37809 - The Connecticut Transmission Municipal Electric Energy Cooperative; Notice of Request for Waiver...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-28

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. TS11-4-000] The Connecticut Transmission Municipal Electric Energy Cooperative; Notice of Request for Waiver or Exemption Take notice that on June 8, 2011, the Connecticut Transmission Municipal Electric Energy Cooperative filed a petition...

  7. 4. Electric motor and transmission wheel on southeast wall of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. Electric motor and transmission wheel on southeast wall of Oil House. - Delaware, Lackawanna & Western Railroad, Scranton Yards, Oil House, 650 feet Southeast of Cliff & Mechanic Streets, Scranton, Lackawanna County, PA

  8. ESTIMATING RISK TO CALIFORNIA ENERGY INFRASTRUCTURE FROM PROJECTED CLIMATE CHANGE

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sathaye, Jayant; Dale, Larry; Larsen, Peter

    2011-06-22

    This report outlines the results of a study of the impact of climate change on the energy infrastructure of California and the San Francisco Bay region, including impacts on power plant generation; transmission line and substation capacity during heat spells; wildfires near transmission lines; sea level encroachment upon power plants, substations, and natural gas facilities; and peak electrical demand. Some end-of-century impacts were projected:Expected warming will decrease gas-fired generator efficiency. The maximum statewide coincident loss is projected at 10.3 gigawatts (with current power plant infrastructure and population), an increase of 6.2 percent over current temperature-induced losses. By the end ofmore » the century, electricity demand for almost all summer days is expected to exceed the current ninetieth percentile per-capita peak load. As much as 21 percent growth is expected in ninetieth percentile peak demand (per-capita, exclusive of population growth). When generator losses are included in the demand, the ninetieth percentile peaks may increase up to 25 percent. As the climate warms, California's peak supply capacity will need to grow faster than the population.Substation capacity is projected to decrease an average of 2.7 percent. A 5C (9F) air temperature increase (the average increase predicted for hot days in August) will diminish the capacity of a fully-loaded transmission line by an average of 7.5 percent.The potential exposure of transmission lines to wildfire is expected to increase with time. We have identified some lines whose probability of exposure to fire are expected to increase by as much as 40 percent. Up to 25 coastal power plants and 86 substations are at risk of flooding (or partial flooding) due to sea level rise.« less

  9. History of Power Transmission Technologies and Future Prospects of Power System of Chubu Electric Power Company

    NASA Astrophysics Data System (ADS)

    Takagi, Hirotaka; Sugiyama, Tomonari; Zashibo, Toshihito

    Since its foundation, the power system of Chubu Electric Power Company (hereinafter CEPCO) has developed through power source and transmission facility formation to meet electricity demand increases. This development has been accompanied by progress in transmission technologies including capacity scale-up, compactification and power system stabilization to operate complex power systems. Now, changes in business situation due to electricity market liberalizatin may bring new challenges to future facility formation. This paper reviews CEPCO's history of power system formation and progress in transmission technologies, and describes future challenges.

  10. How the Timing of Climate Change Policy Affects Infrastructure Turnover in the Electricity Sector: Engineering, Economic and Policy Considerations

    NASA Astrophysics Data System (ADS)

    Izard, Catherine Finlay

    The electricity sector is responsible for producing 35% of US greenhouse gas (GHG) emissions. Estimates suggest that ideally, the electricity sector would be responsible for approximately 85% of emissions abatement associated with climate polices such as America's Clean Energy and Security Act (ACES). This is equivalent to ˜50% cumulative emissions reductions below projected cumulative business-as-usual (BAU) emissions. Achieving these levels of emissions reductions will require dramatic changes in the US electricity generating infrastructure: almost all of the fossil-generation fleet will need to be replaced with low-carbon sources and society is likely to have to maintain a high build rate of new capacity for decades. Unfortunately, the inertia in the electricity sector means that there may be physical constraints to the rate at which new electricity generating capacity can be built. Because the build rate of new electricity generating capacity may be limited, the timing of regulation is critical---the longer the U.S. waits to start reducing GHG emissions, the faster the turnover in the electricity sector must occur in order to meet the same target. There is a real, and thus far unexplored, possibility that the U.S. could delay climate change policy implementation for long enough that it becomes infeasible to attain the necessary rate of turnover in the electricity sector. This dissertation investigates the relationship between climate policy timing and infrastructure turnover in the electricity sector. The goal of the dissertation is to answer the question: How long can we wait before constraints on infrastructure turnover in the electricity sector make achieving our climate goals impossible? Using the Infrastructure Flow Assessment Model, which was developed in this work, this dissertation shows that delaying climate change policy increases average retirements rates by 200-400%, increases average construction rates by 25-85% and increases maximum construction

  11. A Study Examining Photovoltaic (PV) Solar Power as an Alternative for the Rebuilding of the Iraqi Electrical Power Generation Infrastructure

    DTIC Science & Technology

    2005-06-01

    Logistics, BA-5590, BB- 390, BB-2590, PVPC, Iraq, Power Grid, Infrastructure, Cost Estimate, Photovoltaic Power Conversion (PVPC), MPPT 16. PRICE...the cost and feasibility of using photovoltaic (PV) solar power to assist in the rebuilding of the Iraqi electrical infrastructure. This project...cost and feasibility of using photovoltaic (PV) solar power to assist in the rebuilding of the Iraqi infrastructure. The project examines available

  12. Light transmissive electrically conductive oxide electrode formed in the presence of a stabilizing gas

    DOEpatents

    Tran, Nang T.; Gilbert, James R.

    1992-08-04

    A light transmissive, electrically conductive oxide is doped with a stabilizing gas such as H.sub.2 and H.sub.2 O. The oxide is formed by sputtering a light transmissive, electrically conductive oxide precursor onto a substrate at a temperature from 20.degree. C. to 300.degree. C. Sputtering occurs in a gaseous mixture including a sputtering gas and the stabilizing gas.

  13. Within-Day Recharge of Plug-In Hybrid Electric Vehicles: Energy Impact of Public Charging Infrastructure

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dong, Jing; Lin, Zhenhong

    2012-01-01

    This paper studies the role of public charging infrastructure in increasing PHEV s share of driving on electricity and the resulting petroleum use reduction. Using vehicle activity data obtained from the GPS-tracking household travel survey in Austin, Texas, gasoline and electricity consumptions of PHEVs in real world driving context are estimated. Driver s within-day recharging behavior, constrained by travel activities and public charger network, is modeled as a boundedly rational decision and incorporated in the energy use estimation. The key findings from the Austin dataset include: (1) public charging infrastructure makes PHEV a competitive vehicle choice for consumers without amore » home charger; (2) providing sufficient public charging service is expected to significantly reduce petroleum consumption of PHEVs; and (3) public charging opportunities offer greater benefits for PHEVs with a smaller battery pack, as within-day recharges compensate battery capacity.« less

  14. Microwave transmission through metallic hole arrays: Surface electric field measurements

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hou Bo; Hang Zhihong; Wen Weijia

    2006-09-25

    The authors investigate the enhanced microwave transmission through a metal plate perforated by a square lattice of subwavelength holes, predicted to occur as a structure factor resonance phenomenon [F. J. Gracia de Abajo and J. J. Saenz, Phys. Rev. Lett. 95, 233901 (2005)]. By probing the surface electric field on the metallic plate at the peak transmission frequency, they establish the similarities and differences between the structure factor resonance and surface plasmon.

  15. Continuously variable transmission: Assessment of applicability to advance electric vehicles

    NASA Technical Reports Server (NTRS)

    Loewenthal, S. H.; Parker, R. J.

    1981-01-01

    A brief historical account of the evolution of continuously variable transmissions (CVT) for automotive use is given. The CVT concepts which are potentially suitable for application with electric and hybrid vehicles are discussed. The arrangement and function of several CVT concepts are cited along with their current developmental status. The results of preliminary design studies conducted on four CVT concepts for use in advanced electric vehicles are discussed.

  16. Propagation of Epileptiform Activity Can Be Independent of Synaptic Transmission, Gap Junctions, or Diffusion and Is Consistent with Electrical Field Transmission

    PubMed Central

    Zhang, Mingming; Ladas, Thomas P.; Qiu, Chen; Shivacharan, Rajat S.; Gonzalez-Reyes, Luis E.

    2014-01-01

    The propagation of activity in neural tissue is generally associated with synaptic transmission, but epileptiform activity in the hippocampus can propagate with or without synaptic transmission at a speed of ∼0.1 m/s. This suggests an underlying common nonsynaptic mechanism for propagation. To study this mechanism, we developed a novel unfolded hippocampus preparation, from CD1 mice of either sex, which preserves the transverse and longitudinal connections and recorded activity with a penetrating microelectrode array. Experiments using synaptic transmission and gap junction blockers indicated that longitudinal propagation is independent of chemical or electrical synaptic transmission. Propagation speeds of 0.1 m/s are not compatible with ionic diffusion or pure axonal conduction. The only other means of communication between neurons is through electric fields. Computer simulations revealed that activity can indeed propagate from cell to cell solely through field effects. These results point to an unexpected propagation mechanism for neural activity in the hippocampus involving endogenous field effect transmission. PMID:24453330

  17. Wireless electricity (Power) transmission using solar based power satellite technology

    NASA Astrophysics Data System (ADS)

    Maqsood, M.; Nauman Nasir, M.

    2013-06-01

    In the near future due to extensive use of energy, limited supply of resources and the pollution in environment from present resources e.g. (wood, coal, fossil fuel) etc, alternative sources of energy and new ways to generate energy which are efficient, cost effective and produce minimum losses are of great concern. Wireless electricity (Power) transmission (WET) has become a focal point as research point of view and nowadays lies at top 10 future hot burning technologies that are under research these days. In this paper, we present the concept of transmitting power wirelessly to reduce transmission and distribution losses. The wired distribution losses are 70 - 75% efficient. We cannot imagine the world without electric power which is efficient, cost effective and produce minimum losses is of great concern. This paper tells us the benefits of using WET technology specially by using Solar based Power satellites (SBPS) and also focuses that how we make electric system cost effective, optimized and well organized. Moreover, attempts are made to highlight future issues so as to index some emerging solutions.

  18. Mortality of persons resident in the vicinity of electricity transmission facilities.

    PubMed Central

    McDowall, M. E.

    1986-01-01

    Several studies have raised the possibility that exposure to electrical and/or magnetic fields may be injurious to health in particular by the promotion or initiation of cancer. To investigate whether the electricity transmission system presents a long term hazard to public health, the mortality of nearly 8,000 persons, identified as living in the vicinity of electrical transmission facilities at the time of the 1971 Population Census, has been followed to the end of 1983. All identified transmission installations within pre-defined areas were included in the study with the result that the greater part of the study group were believed to be resident near relatively low voltage sub-stations. Overall mortality was lower than expected and no evidence of major health hazards emerged. The only statistically significant excess mortality was for lung cancer (in women overall, and in persons living closest to the installations); this result is difficult to interpret in the absence of smoking data, and is not supported by other evidence but does not appear to be due to the social class distribution of the study group. The study did not support previously reported associations of exposure to electro-magnetic fields with acute myeloid leukaemia, other lymphatic cancers and suicide. PMID:3456788

  19. Idaho National Laboratory’s Analysis of ARRA-Funded Plug-in Electric Vehicle and Charging Infrastructure Projects: Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Francfort, Jim; Bennett, Brion; Carlson, Richard

    2015-09-01

    Battelle Energy Alliance, LLC, managing and operating contractor for the U.S. Department of Energy’s (DOE) Idaho National Laboratory (INL), is the lead laboratory for U.S. Department of Energy’s Advanced Vehicle Testing Activity (AVTA). INL’s conduct of the AVTA resulted in a significant base of knowledge and experience in the area of testing light-duty vehicles that reduced transportation-related petroleum consumption. Due to this experience, INL was tasked by DOE to develop agreements with companies that were the recipients of The American Recovery and Reinvestment Act of 2009 (ARRA) grants, that would allow INL to collect raw data from light-duty vehicles andmore » charging infrastructure. INL developed non-disclosure agreements (NDAs) with several companies and their partners that resulted in INL being able to receive raw data via server-to-server connections from the partner companies. This raw data allowed INL to independently conduct data quality checks, perform analysis, and report publicly to DOE, partners, and stakeholders, how drivers used both new vehicle technologies and the deployed charging infrastructure. The ultimate goal was not the deployment of vehicles and charging infrastructure, cut rather to create real-world laboratories of vehicles, charging infrastructure and drivers that would aid in the design of future electric drive transportation systems. The five projects that INL collected data from and their partners are: • ChargePoint America - Plug-in Electric Vehicle Charging Infrastructure Demonstration • Chrysler Ram PHEV Pickup - Vehicle Demonstration • General Motors Chevrolet Volt - Vehicle Demonstration • The EV Project - Plug-in Electric Vehicle Charging Infrastructure Demonstration • EPRI / Via Motors PHEVs – Vehicle Demonstration The document serves to benchmark the performance science involved the execution, analysis and reporting for the five above projects that provided lessons learned based on driver’s use of

  20. 18 CFR 35.35 - Transmission infrastructure investment.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Organization means a Regional Transmission Organization, Independent System Operator, independent transmission provider, or other transmission organization finally approved by the Commission for the operation of... base; (iii) Recovery of prudently incurred pre-commercial operations costs; (iv) Hypothetical capital...

  1. Competitive Electricity Market Regulation in the United States: A Primer

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Flores-Espino, Francisco; Tian, Tian; Chernyakhovskiy, Ilya

    The electricity system in the United States is a complex mechanism where different technologies, jurisdictions and regulatory designs interact. Today, two major models for electricity commercialization operate in the United States. One is the regulated monopoly model, in which vertically integrated electricity providers are regulated by state commissions. The other is the competitive model, in which power producers can openly access transmission infrastructure and participate in wholesale electricity markets. This paper describes the origins, evolution, and current status of the regulations that enable competitive markets in the United States.

  2. CO2 Emissions Embodied in Interprovincial Electricity Transmissions in China.

    PubMed

    Qu, Shen; Liang, Sai; Xu, Ming

    2017-09-19

    Existing studies on the evaluation of CO 2 emissions due to electricity consumption in China are inaccurate and incomplete. This study uses a network approach to calculate CO 2 emissions of purchased electricity in Chinese provinces. The CO 2 emission factors of purchased electricity range from 265 g/kWh in Sichuan to 947 g/kWh in Inner Mongolia. We find that emission factors of purchased electricity in many provinces are quite different from the emission factors of electricity generation. This indicates the importance of the network approach in accurately reflecting embodied emissions. We also observe substantial variations of emissions factors of purchased electricity within subnational grids: the provincial emission factors deviate from the corresponding subnational-grid averages from -58% to 44%. This implies that using subnational-grid averages as required by Chinese government agencies can be quite inaccurate for reporting indirect CO 2 emissions of enterprises' purchased electricity. The network approach can improve the accuracy of the quantification of embodied emissions in purchased electricity and emission flows embodied in electricity transmission.

  3. Lessons Learned about Plug-in Electric Vehicle Charging Infrastructure from The EV Project and ChargePoint America

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smart, John Galloway; Salisbury, Shawn Douglas

    2015-07-01

    This report summarizes key findings in two national plug-in electric vehicle charging infrastructure demonstrations: The EV Project and ChargePoint America. It will be published to the INL/AVTA website for the general public.

  4. Dynamics of periodic spring-mass chain coupled with an electric transmission line

    NASA Astrophysics Data System (ADS)

    Belloni, Edoardo; Cenedese, Mattia; Braghin, Francesco

    2017-04-01

    Periodic structures have received large interest due to their peculiar behavior: they have band gaps, that is portions of the frequency response along with any wave incoming in the structure is reflected. Numerous are the applications, like metamaterials and locally resonant structures. Nowadays, new possibilities could come from mechanical periodic structures that are connected to an electrical transmission line, periodic in turn. Starting from this idea, this paper analyses ideal a mono-atomic spring-mass chain, considering the springs connected to a periodic electric network, composed by inductances (and resistors): these simple examples will show how the frequency response is affected. In particular, the mutual influence between the electric and mechanical domain is highlighted, and the contribution of parameters on band gap positioning and design is explored. Details are provided about vibration modes and wave transmission.

  5. Flexible gas insulated transmission line having regions of reduced electric field

    DOEpatents

    Cookson, Alan H.; Fischer, William H.; Yoon, Kue H.; Meyer, Jeffry R.

    1983-01-01

    A gas insulated transmission line having radially flexible field control means for reducing the electric field along the periphery of the inner conductor at predetermined locations wherein the support insulators are located. The radially flexible field control means of the invention includes several structural variations of the inner conductor, wherein careful controlling of the length to depth of surface depressions produces regions of reduced electric field. Several embodiments of the invention dispose a flexible connector at the predetermined location along the inner conductor where the surface depressions that control the reduced electric field are located.

  6. Efficient design of multituned transmission line NMR probes: the electrical engineering approach.

    PubMed

    Frydel, J A; Krzystyniak, M; Pienkowski, D; Pietrzak, M; de Sousa Amadeu, N; Ratajczyk, T; Idzik, K; Gutmann, T; Tietze, D; Voigt, S; Fenn, A; Limbach, H H; Buntkowsky, G

    2011-01-01

    Transmission line-based multi-channel solid state NMR probes have many advantages regarding the cost of construction, number of RF-channels, and achievable RF-power levels. Nevertheless, these probes are only rarely employed in solid state-NMR-labs, mainly owing to the difficult experimental determination of the necessary RF-parameters. Here, the efficient design of multi-channel solid state MAS-NMR probes employing transmission line theory and modern techniques of electrical engineering is presented. As technical realization a five-channel ((1)H, (31)P, (13)C, (2)H and (15)N) probe for operation at 7 Tesla is described. This very cost efficient design goal is a multi port single coil transmission line probe based on the design developed by Schaefer and McKay. The electrical performance of the probe is determined by measuring of Scattering matrix parameters (S-parameters) in particular input/output ports. These parameters are compared to the calculated parameters of the design employing the S-matrix formalism. It is shown that the S-matrix formalism provides an excellent tool for examination of transmission line probes and thus the tool for a rational design of these probes. On the other hand, the resulting design provides excellent electrical performance. From a point of view of Nuclear Magnetic Resonance (NMR), calibration spectra of particular ports (channels) are of great importance. The estimation of the π/2 pulses length for all five NMR channels is presented. Copyright © 2011 Elsevier Inc. All rights reserved.

  7. Alternative Fuels Data Center: Developing Infrastructure to Charge Plug-In

    Science.gov Websites

    Electric Vehicles Developing Infrastructure to Charge Plug-In Electric Vehicles to someone by E -mail Share Alternative Fuels Data Center: Developing Infrastructure to Charge Plug-In Electric Vehicles on Facebook Tweet about Alternative Fuels Data Center: Developing Infrastructure to Charge Plug-In

  8. Design studies of continuously variable transmissions for electric vehicles

    NASA Technical Reports Server (NTRS)

    Parker, R. J.; Loewenthal, S. H.; Fischer, G. K.

    1981-01-01

    Preliminary design studies were performed on four continuously variable transmission (CVT) concepts for use with a flywheel equipped electric vehicle of 1700 kg gross weight. Requirements of the CVT's were a maximum torque of 450 N-m (330 lb-ft), a maximum output power of 75 kW (100 hp), and a flywheel speed range of 28,000 to 14,000 rpm. Efficiency, size, weight, cost, reliability, maintainability, and controls were evaluated for each of the four concepts which included a steel V-belt type, a flat rubber belt type, a toroidal traction type, and a cone roller traction type. All CVT's exhibited relatively high calculated efficiencies (68 percent to 97 percent) over a broad range of vehicle operating conditions. Estimated weight and size of these transmissions were comparable to or less than equivalent automatic transmission. The design of each concept was carried through the design layout stage.

  9. Energy Infrastructure and Extreme Events (Invited)

    NASA Astrophysics Data System (ADS)

    Wakimoto, R. M.

    2013-12-01

    The country's energy infrastructure is sensitive to the environment, especially extreme events. Increasing global temperatures, intense storms, and space weather have the potential to disrupt energy production and transport. It can also provide new opportunities as illustrated by the opening of the Northwest Passage. The following provides an overview of some of the high impacts of major geophysical events on energy production and transport. Future predictions of hurricanes suggest that we can expect fewer storms but they will be associated with stronger winds and more precipitation. The winds and storm surge accompanying hurricane landfall along the Gulf States has had a major impact on the coastal energy infrastructure and the oil/natural gas platforms. The impact of these surges will increase with predicted sea level rise. Hurricane Katrina caused damage to crude oil pipelines and refineries that reduced oil production by 19% for the year. The disruption that can occur is not necessarily linked with the maximum winds of the tropical storm as recently shown by Hurricane Sandy which was classified as a ';post-tropical cyclone' during landfall. Another intense circulation, the tornado, can also cause power outages and network breaks from high winds that can topple power poles or damage power lines from fallen trees. Fortunately, the Moore tornado, rated EF5, did not have a major impact on the oil and gas infrastructure in Oklahoma. The impact of earthquakes and tsunamis on energy was illustrated in Japan in 2011 with the shutdown of the Fukushima Daiichi plant. Other studies have suggested that there are areas in the United States where the energy services are highly vulnerable to major earthquakes that would disrupt electrical and gas networks for extended periods of time. Seismic upgrades to the energy infrastructure would help mitigate the impact. In 1859, a coronal mass ejection triggered a geomagnetic storm that disrupted communication wires around the world

  10. A study of electric transmission lines for use on the lunar surface

    NASA Technical Reports Server (NTRS)

    Gaustad, Krista L.; Gordon, Lloyd B.; Weber, Jennifer R.

    1994-01-01

    The sources for electrical power on a lunar base are said to include solar/chemical, nuclear (static conversion), and nuclear (dynamic conversion). The transmission of power via transmission lines is more practical than power beaming or superconducting because of its low cost and reliable, proven technology. Transmission lines must have minimum mass, maximum efficiency, and the ability to operate reliably in the lunar environment. The transmission line design includes conductor material, insulator material, conductor geometry, conductor configuration, line location, waveform, phase selection, and frequency. This presentation oulines the design. Liquid and gaseous dielectrics are undesirable for long term use in the lunar vacuum due to a high probability of loss. Thus, insulation for high voltage transmission line will most likely be solid dielectric or vacuum insulation.

  11. Downhole transmission system

    DOEpatents

    Hall, David R [Provo, UT; Fox, Joe [Spanish Fork, UT

    2008-01-15

    A transmission system in a downhole component comprises a data transmission element in both ends of the downhole component. Each data transmission element houses an electrically conducting coil in a MCEI circular trough. An electrical conductor connects both the transmission elements. The electrical conductor comprises at least three electrically conductive elements insulated from each other. In the preferred embodiment the electrical conductor comprises an electrically conducting outer shield, an electrically conducting inner shield and an electrical conducting core. In some embodiments of the present invention, the electrical conductor comprises an electrically insulating jacket. In other embodiments, the electrical conductor comprises a pair of twisted wires. In some embodiments, the electrical conductor comprises semi-conductive material.

  12. One-dimensional pressure transfer models for acoustic-electric transmission channels

    NASA Astrophysics Data System (ADS)

    Wilt, K. R.; Lawry, T. J.; Scarton, H. A.; Saulnier, G. J.

    2015-09-01

    A method for modeling piezoelectric-based ultrasonic acoustic-electric power and data transmission channels is presented. These channels employ piezoelectric disk transducers to convey signals across a series of physical layers using ultrasonic waves. This model decomposes the mechanical pathway of the signal into individual ultrasonic propagation layers which are generally independent of the layer's adjacent domains. Each layer is represented by a two-by-two traveling pressure wave transfer matrix which relates the forward and reverse pressure waves on one side of the layer to the pressure waves on the opposite face, where each face is assumed to be in contact with a domain of arbitrary reference acoustic impedance. A rigorous implementation of ultrasonic beam spreading is introduced and implemented within applicable domains. Compatible pressure-wave models for piezoelectric transducers are given, which relate the electric voltage and current interface of the transducer to the pressure waves on one mechanical interface while also allowing for passive acoustic loading of the secondary mechanical interface. It is also shown that the piezoelectric model's electrical interface is compatible with transmission line parameters (ABCD-parameters), allowing for connection of electronic components and networks. The model is shown to be capable of reproducing the behavior of realistic physical channels.

  13. Puget Sound Area Electric Reliability Plan : Appendix E, Transmission Reinforcement Analysis.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration.

    1992-04-01

    The purpose of this appendix to the draft environmental impact statement (EIS) report is to provide an update of the latest study work done on transmission system options for the Puget Sound Area Electric Reliability Plan. Also included in the attachments to the EIS are 2 reports analyzing the voltage stability of the Puget Sound transmission system and a review by Power Technologies, Inc. of the BPA voltage stability analysis and reactive options. Five transmission line options and several reactive options are presently being considered as possible solutions to the PSAFRP by the Transmission Team. The first two line optionsmore » would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. Plans were designed to provide at least 500 MVAR reactive margin.« less

  14. Preliminary assessment of the tradeoffs between the electric motor and the transmission in electric vehicles

    NASA Technical Reports Server (NTRS)

    Levi, E.

    1983-01-01

    The efficiency, weight, and cost of various propulsion system for 4-passenger electric vehicles are compared. These systems comprise the electric motor and the required speed reducing transmission to obtain the appropriate speed at the wheel. Three types of motors, dc synchronous, and squirrel-cage were considered at 6000 ycm and 24 000 rpm for a peak power of 40 kW. Two types of gearing selected were a single speed differential and a differential with a differential with a 4-speed gearbox. Only components that were readily realizable within present state-of-the-art were considered.

  15. Preliminary assessment of the tradeoffs between the electric motor and the transmission in electric vehicles

    NASA Astrophysics Data System (ADS)

    Levi, E.

    1983-05-01

    The efficiency, weight, and cost of various propulsion system for 4-passenger electric vehicles are compared. These systems comprise the electric motor and the required speed reducing transmission to obtain the appropriate speed at the wheel. Three types of motors, dc synchronous, and squirrel-cage were considered at 6000 ycm and 24 000 rpm for a peak power of 40 kW. Two types of gearing selected were a single speed differential and a differential with a differential with a 4-speed gearbox. Only components that were readily realizable within present state-of-the-art were considered.

  16. EV Charging Infrastructure Roadmap

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Karner, Donald; Garetson, Thomas; Francfort, Jim

    2016-08-01

    As highlighted in the U.S. Department of Energy’s EV Everywhere Grand Challenge, vehicle technology is advancing toward an objective to “… produce plug-in electric vehicles that are as affordable and convenient for the average American family as today’s gasoline-powered vehicles …” [1] by developing more efficient drivetrains, greater battery energy storage per dollar, and lighter-weight vehicle components and construction. With this technology advancement and improved vehicle performance, the objective for charging infrastructure is to promote vehicle adoption and maximize the number of electric miles driven. The EV Everywhere Charging Infrastructure Roadmap (hereafter referred to as Roadmap) looks forward and assumesmore » that the technical challenges and vehicle performance improvements set forth in the EV Everywhere Grand Challenge will be met. The Roadmap identifies and prioritizes deployment of charging infrastructure in support of this charging infrastructure objective for the EV Everywhere Grand Challenge« less

  17. 77 FR 69754 - Promoting Transmission Investment Through Pricing Reform

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-21

    ...-26-000] Promoting Transmission Investment Through Pricing Reform AGENCY: Federal Energy Regulatory... necessary to encourage transmission infrastructure investment while maintaining just and reasonable rates... necessary to encourage transmission infrastructure investment while maintaining just and reasonable rates...

  18. Electric Vehicle Charging and the California Power Sector: Evaluating the Effect of Location and Time on Greenhouse Gas Emissions

    NASA Astrophysics Data System (ADS)

    Sohnen, Julia Meagher

    This thesis explores the implications of the increased adoption of plug-in electric vehicles in California through its effect on the operation of the state's electric grid. The well-to-wheels emissions associated with driving an electric vehicle depend on the resource mix of the electricity grid used to charge the battery. We present a new least-cost dispatch model, EDGE-NET, for the California electricity grid consisting of interconnected sub-regions that encompass the six largest state utilities that can be used to evaluate the impact of growing electric vehicle demand on existing power grid infrastructure system and energy resources. This model considers spatiality and temporal dynamics of energy demand and supply when determining the regional impacts of additional charging profiles on the current electricity network. Model simulation runs for one year show generation and transmission congestion to be reasonable similar to historical data. Model simulation results show that average emissions and system costs associated with electricity generation vary significantly by time of day, season, and location. Marginal cost and emissions also exhibit seasonal and diurnal differences, but show less spatial variation. Sensitivity of demand analysis shows that the relative changes to average emissions and system costs respond asymmetrically to increases and decreases in electricity demand. These results depend on grid mix at the time and the marginal power plant type. In minimizing total system cost, the model will choose to dispatch the lowest-cost resource to meet additional vehicle demand, regardless of location, as long as transmission capacity is available. Location of electric vehicle charging has a small effect on the marginal greenhouse gas emissions associated with additional generation, due to electricity losses in the transmission grid. We use a geographically explicit, charging assessment model for California to develop and compare the effects of two charging

  19. Electrical and chemical transmission between striatal GABAergic output neurones in rat brain slices

    PubMed Central

    Venance, Laurent; Glowinski, Jacques; Giaume, Christian

    2004-01-01

    Basal ganglia are interconnected subcortical nuclei, connected to the thalamus and all cortical areas involved in sensory motor control, limbic functions and cognition. The striatal output neurones (SONs), the major striatal population, are believed to act as detectors and integrators of distributed patterns of cerebral cortex inputs. Despite the key role of SONs in cortico-striatal information processing, little is known about their local interactions. Here, we report the existence and characterization of electrical and GABAergic transmission between SONs in rat brain slices. Tracer coupling (biocytin) incidence was high during the first two postnatal weeks and then decreased (postnatal days (P) 5–25, 60%; P25–30, 29%; n = 61). Electrical coupling was observed between 27% of SON pairs (coupling coefficient: 3.1 ± 0.3%, n = 89 at P15) and as shown by single-cell RT-PCR, several connexin (Cx) mRNAs were found to be expressed (Cx31.1, Cx32, Cx36 and Cx47). GABAergic synaptic transmission (abolished by bicuculline, a GABAA receptor antagonist) observed in 19% of SON pairs (n = 62) was reliable (mean failure rate of 6 ± 3%), precise (variation coefficient of latency, 0.06), strong (IPSC amplitudes of 38 ± 12 pA) and unidirectional. Interestingly, electrical and chemical transmission were mutually exclusive. These results suggest that preferential networks of electrically and chemically connected SONs, might be involved in the channelling of cortico-basal ganglia information processing. PMID:15235091

  20. Population as a proxy for infrastructure in the determination of event response and recovery resource allocations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stamber, Kevin L.; Unis, Carl J.; Shirah, Donald N.

    Research into modeling of the quantification and prioritization of resources used in the recovery of lifeline critical infrastructure following disruptive incidents, such as hurricanes and earthquakes, has shown several factors to be important. Among these are population density and infrastructure density, event effects on infrastructure, and existence of an emergency response plan. The social sciences literature has a long history of correlating the population density and infrastructure density at a national scale, at a country-to-country level, mainly focused on transportation networks. This effort examines whether these correlations can be repeated at smaller geographic scales, for a variety of infrastructure types,more » so as to be able to use population data as a proxy for infrastructure data where infrastructure data is either incomplete or insufficiently granular. Using the best data available, this effort shows that strong correlations between infrastructure density for multiple types of infrastructure (e.g. miles of roads, hospital beds, miles of electric power transmission lines, and number of petroleum terminals) and population density do exist at known geographic boundaries (e.g. counties, service area boundaries) with exceptions that are explainable within the social sciences literature. Furthermore, the correlations identified provide a useful basis for ongoing research into the larger resource utilization problem.« less

  1. Population as a proxy for infrastructure in the determination of event response and recovery resource allocations

    DOE PAGES

    Stamber, Kevin L.; Unis, Carl J.; Shirah, Donald N.; ...

    2016-04-01

    Research into modeling of the quantification and prioritization of resources used in the recovery of lifeline critical infrastructure following disruptive incidents, such as hurricanes and earthquakes, has shown several factors to be important. Among these are population density and infrastructure density, event effects on infrastructure, and existence of an emergency response plan. The social sciences literature has a long history of correlating the population density and infrastructure density at a national scale, at a country-to-country level, mainly focused on transportation networks. This effort examines whether these correlations can be repeated at smaller geographic scales, for a variety of infrastructure types,more » so as to be able to use population data as a proxy for infrastructure data where infrastructure data is either incomplete or insufficiently granular. Using the best data available, this effort shows that strong correlations between infrastructure density for multiple types of infrastructure (e.g. miles of roads, hospital beds, miles of electric power transmission lines, and number of petroleum terminals) and population density do exist at known geographic boundaries (e.g. counties, service area boundaries) with exceptions that are explainable within the social sciences literature. Furthermore, the correlations identified provide a useful basis for ongoing research into the larger resource utilization problem.« less

  2. Simulation study on transient electric shock characteristics of human body under high voltage ac transmission lines

    NASA Astrophysics Data System (ADS)

    Huang, Tao; Zou, Yanhui; Lv, Jianhong; Yang, Jinchun; Tao, Li; Zhou, Jianfei

    2017-09-01

    Human body under high-voltage AC transmission lines will produce a certain induced voltage due to the electrostatic induction. When the human body contacts with some grounded objects, the charges transfer from the body to the ground and produce contact current which may cause transient electric shock. Using CDEGS and ATP/EMTP, the paper proposes a method for quantitatively calculating the transient electric shock characteristics. It calculates the human body voltage, discharge current and discharge energy under certain 500kV compact-type transmission lines and predicts the corresponding human feelings. The results show that the average root value of discharge current is less than 10mA when the human body is under the 500kV compact-type transmission lines and the human body is overall safe if the transmission lines satisfy the relevant design specifications. It concludes that the electric field strength above the ground should be limited to 4kV/m through the residential area for the purpose of reducing the electromagnetic impact.

  3. Wireless Sensor Network for Electric Transmission Line Monitoring

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Alphenaar, Bruce

    Generally, federal agencies tasked to oversee power grid reliability are dependent on data from grid infrastructure owners and operators in order to obtain a basic level of situational awareness. Since there are many owners and operators involved in the day-to-day functioning of the power grid, the task of accessing, aggregating and analyzing grid information from these sources is not a trivial one. Seemingly basic tasks such as synchronizing data timestamps between many different data providers and sources can be difficult as evidenced during the post-event analysis of the August 2003 blackout. In this project we investigate the efficacy and costmore » effectiveness of deploying a network of wireless power line monitoring devices as a method of independently monitoring key parts of the power grid as a complement to the data which is currently available to federal agencies from grid system operators. Such a network is modeled on proprietary power line monitoring technologies and networks invented, developed and deployed by Genscape, a Louisville, Kentucky based real-time energy information provider. Genscape measures transmission line power flow using measurements of electromagnetic fields under overhead high voltage transmission power lines in the United States and Europe. Opportunities for optimization of the commercial power line monitoring technology were investigated in this project to enable lower power consumption, lower cost and improvements to measurement methodologies. These optimizations were performed in order to better enable the use of wireless transmission line monitors in large network deployments (perhaps covering several thousand power lines) for federal situational awareness needs. Power consumption and cost reduction were addressed by developing a power line monitor using a low power, low cost wireless telemetry platform known as the ''Mote''. Motes were first developed as smart sensor nodes in wireless mesh networking applications. On such a

  4. Semi-flexible gas-insulated transmission line using electric field stress shields

    DOEpatents

    Cookson, A.H.; Dale, S.J.; Bolin, P.C.

    1982-12-28

    A gas-insulated transmission line includes an outer sheath, an inner conductor, an insulating gas electrically insulating the inner conductor from the outer sheath, and insulating supports insulatably supporting the inner conductor within the outer sheath. The inner conductor is provided with flexibility by use of main conductor sections which are joined together through a conductor hub section and flexible flexing elements. Stress shields are provided to control the electric field at the locations of the conductor hub sections where the insulating supports are contacting the inner conductor. The flexing elements and the stress shields may also be utilized in connection with a plug and socket arrangement for providing electrical connection between main conductor sections. 10 figs.

  5. Semi-flexible gas-insulated transmission line using electric field stress shields

    DOEpatents

    Cookson, Alan H.; Dale, Steinar J.; Bolin, Philip C.

    1982-12-28

    A gas-insulated transmission line includes an outer sheath, an inner conductor, an insulating gas electrically insulating the inner conductor from the outer sheath, and insulating supports insulatably supporting the inner conductor within the outer sheath. The inner conductor is provided with flexibility by use of main conductor sections which are joined together through a conductor hub section and flexible flexing elements. Stress shields are provided to control the electric field at the locations of the conductor hub sections where the insulating supports are contacting the inner conductor. The flexing elements and the stress shields may also be utilized in connection with a plug and socket arrangement for providing electrical connection between main conductor sections.

  6. Airborne biological hazards and urban transport infrastructure: current challenges and future directions.

    PubMed

    Nasir, Zaheer Ahmad; Campos, Luiza Cintra; Christie, Nicola; Colbeck, Ian

    2016-08-01

    Exposure to airborne biological hazards in an ever expanding urban transport infrastructure and highly diverse mobile population is of growing concern, in terms of both public health and biosecurity. The existing policies and practices on design, construction and operation of these infrastructures may have severe implications for airborne disease transmission, particularly, in the event of a pandemic or intentional release of biological of agents. This paper reviews existing knowledge on airborne disease transmission in different modes of transport, highlights the factors enhancing the vulnerability of transport infrastructures to airborne disease transmission, discusses the potential protection measures and identifies the research gaps in order to build a bioresilient transport infrastructure. The unification of security and public health research, inclusion of public health security concepts at the design and planning phase, and a holistic system approach involving all the stakeholders over the life cycle of transport infrastructure hold the key to mitigate the challenges posed by biological hazards in the twenty-first century transport infrastructure.

  7. Automated manual transmission controller

    DOEpatents

    Lawrie, Robert E.; Reed, Jr., Richard G.; Bernier, David R.

    1999-12-28

    A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

  8. Cryo-delivery Systems for the Co-transmission of Chemical and Electrical Power

    NASA Astrophysics Data System (ADS)

    Grant, Paul M.

    2006-04-01

    We present a novel concept for the simultaneous transport of chemical power in the form of natural gas or hydrogen in a cryogenic state along with the simultaneous transmission of electrical power over via superconductivity. This concept could impact future efforts to tap and deliver methane from distant geographic resources over conventional pipelines with part of the chemical potential energy converted directly to electricity at the wellhead and the remaining gas cooled cryogenically to increase volumetric density and provide the necessary support of a superconducting cable housed within the same packaging. As the fossil reserve becomes depleted, nuclear power plants would be constructed at the former remote wellhead sites to co-generate electricity and cryocooled hydrogen, the latter replacing natural gas and also serving to operate the already installed superconducting electrical service line.

  9. Feasible Electricity Infrastructure Pathways in the Context of Climate-Water Change Constraints

    NASA Astrophysics Data System (ADS)

    Miara, A.; Vorosmarty, C. J.; Macknick, J.; Cohen, S. M.; Tidwell, V. C.; Newmark, R. L.; Fekete, B. M.; Corsi, F.; Sun, Y.; Proussevitch, A. A.; Glidden, S.

    2017-12-01

    highlight the importance of linking Earth-system and economic modeling tools and provide insight on potential electricity infrastructure pathways that are sustainable, in terms lowering both water use and carbon emissions, and reliable in the face of future climate-water resource constraints.

  10. Lafayette, Colorado: Using Energy Data for Electric Vehicle Infrastructure Planning (City Energy: From Data to Decisions)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Office of Strategic Programs, Strategic Priorities and Impact Analysis Team

    This fact sheet "Lafayette, Colorado: Using Energy Data for Electric Vehicle Infrastructure Planning" explains how the City of Lafayette used data from the U.S. Department of Energy's Cities Leading through Energy Analysis and Planning (Cities-LEAP) and the State and Local Energy Data (SLED) programs to inform its city energy planning. It is one of ten fact sheets in the "City Energy: From Data to Decisions" series.

  11. Understanding Cognitive and Collaborative Work: Observations in an Electric Transmission Operations Control Center

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Obradovich, Jodi H.

    2011-09-30

    This paper describes research that is part of an ongoing project to design tools to assist in the integration of renewable energy into the electric grid. These tools will support control room dispatchers in real-time system operations of the electric power transmission system which serves much of the Western United States. Field observations comprise the first phase of this research in which 15 operators have been observed over various shifts and times of day for approximately 90 hours. Findings describing some of the cognitive and environmental challenges of managing the dynamically changing electric grid are presented.

  12. The Spatial Footprint of Natural Gas-Fired Electricity

    NASA Astrophysics Data System (ADS)

    Jordaan, S. M.; Heath, G.; Macknick, J.; Mohammadi, E.; Ben-Horin, D.; Urrea, V.; Marceau, D.

    2015-12-01

    Consistent comparisons of the amount of land required for different electricity generation technologies are challenging because land use associated with fossil fuel acquisition and delivery has not been well characterized or empirically grounded. This research focuses on improving estimates of the life cycle land use of natural gas-fired electricity (m2/MWh generated) through the novel combination of inventories of natural gas-related infrastructure, satellite imagery analysis and gas production estimates. We focus on seven counties that represent 98% of the total gas production in the Barnett Shale (Texas), evaluating over 500 sites across five life cycle stages (gas production, gathering, processing, transmission, and power generation as well as produced water disposal). We find that a large fraction of total life cycle land use is related to gathering (midstream) infrastructure, particularly pipelines; access roads related to all stages also contribute a large life cycle share. Results were sensitive to several inputs, including well lifetime, pipeline right of way, number of wells per site, variability of heat rate for electricity generation, and facility lifetime. Through this work, we have demonstrated a novel, highly-resolved and empirical method for estimating life cycle land use from natural gas infrastructure in an important production region. When replicated for other gas production regions and other fuels, the results can enable more empirically-grounded and robust comparisons of the land footprint of alternative energy choices.

  13. American lifelines alliance efforts to improve electric power transmission reliability

    USGS Publications Warehouse

    Nishenko, S.P.; Savage, W.U.; Honegger, D.G.; McLane, T.R.; ,

    2002-01-01

    A study was performed on American Lifelines Alliance (ALA) efforts to improve electric power transmission reliability. ALA is a public-private partnership project, with the goal of reducing risks to lifelines from natural hazards and human threat events. The mechanism used by ALA for developing national guidelines for lifeline systems is dependent upon using existing Standards Developing Organizations (SDO) accredited by the American National Standards Institute (ANSI) as means to achieve national consensus.

  14. 78 FR 70163 - Communication of Operational Information between Natural Gas Pipelines and Electric Transmission...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-22

    ... a continued high level of reliability of interstate natural gas pipelines and that this will, in turn, ensure a continued high level of reliability of the electric transmission grid.\\40\\ Consumers...

  15. Electrical transmission between mammalian neurons is supported by a small fraction of gap junction channels.

    PubMed

    Curti, Sebastian; Hoge, Gregory; Nagy, James I; Pereda, Alberto E

    2012-06-01

    Electrical synapses formed by gap junctions between neurons create networks of electrically coupled neurons in the mammalian brain, where these networks have been found to play important functional roles. In most cases, interneuronal gap junctions occur at remote dendro-dendritic contacts, making difficult accurate characterization of their physiological properties and correlation of these properties with their anatomical and morphological features of the gap junctions. In the mesencephalic trigeminal (MesV) nucleus where neurons are readily accessible for paired electrophysiological recordings in brain stem slices, our recent data indicate that electrical transmission between MesV neurons is mediated by connexin36 (Cx36)-containing gap junctions located at somato-somatic contacts. We here review evidence indicating that electrical transmission between these neurons is supported by a very small fraction of the gap junction channels present at cell-cell contacts. Acquisition of this evidence was enabled by the unprecedented experimental access of electrical synapses between MesV neurons, which allowed estimation of the average number of open channels mediating electrical coupling in relation to the average number of gap junction channels present at these contacts. Our results indicate that only a small proportion of channels (~0.1 %) appear to be conductive. On the basis of similarities with other preparations, we postulate that this phenomenon might constitute a general property of vertebrate electrical synapses, reflecting essential aspects of gap junction function and maintenance.

  16. Two-dimensional solitary waves and periodic waves on coupled nonlinear electrical transmission lines

    NASA Astrophysics Data System (ADS)

    Wang, Heng; Zheng, Shuhua

    2017-06-01

    By using the dynamical system approach, the exact travelling wave solutions for a system of coupled nonlinear electrical transmission lines are studied. Based on this method, the bifurcations of phase portraits of a dynamical system are given. The two-dimensional solitary wave solutions and periodic wave solutions on coupled nonlinear transmission lines are obtained. With the aid of Maple, the numerical simulations are conducted for solitary wave solutions and periodic wave solutions to the model equation. The results presented in this paper improve upon previous studies.

  17. Potential benefits of long-distance electricity transmission in China for air quality and climate

    NASA Astrophysics Data System (ADS)

    Peng, W.; Mauzerall, D. L.; Yuan, J.; Zhao, Y.; Lin, M.; Zhang, Q.

    2015-12-01

    China is expanding west-to-east long-distance electricity transmission capacity with the aim of reducing eastern coal power production and resulting air pollution. In addition to coal power, this new grid capacity can be used to transport renewable-generated electricity with resulting climate co-benefits. Here we use an integrated assessment to evaluate the air quality and climate benefits of twelve proposed transmission lines in China, and compare two energy-by-wire strategies that transmit 1) only coal power (Coal-by-wire, CbW) or 2) combined renewable plus coal power (Renewable and coal-by-wire, (RE+C)bW), with 3) the current practice of transporting coal by rail for conversion to electricity near eastern demand centers (Coal-by-rail, CbR). Based on a regional atmospheric chemistry model, WRF-Chem, electricity transmission through the proposed lines leads to 2-3 μg/m3 (2-7%) reduction in the annual mean concentrations of fine particulate matter (PM2.5) in the eastern provinces relative to 2010 levels, roughly ~1 μg/m3 greater than the reduction achieved in CbR where dirty coal units are locally replaced with efficient ones. Although the eastern air quality improvement is similar irrespective of the fuel source to power the lines, adding coal generation results in up to 3% increase in annual mean PM2.5 levels in some exporting provinces, whereas such increase is not observed when most added capacity is renewable-based. Counting both the economic value of reduced carbon emissions and the health-related air quality benefits can significantly improve the cost-effectiveness of transmitting both renewable and coal power. Comparing (RE+C)bW with the two coal-based options, we find not only 20% larger reduction in air-pollution-related deaths, but also three times greater reduction in CO2 emissions. Our study hence demonstrates the significance of coordinating renewable energy planning with transmission planning to simultaneously tackle air pollution and climate

  18. Modulational Instability in a Pair of Non-identical Coupled Nonlinear Electrical Transmission Lines

    NASA Astrophysics Data System (ADS)

    Eric, Tala-Tebue; Aurelien, Kenfack-Jiotsa; Marius Hervé, Tatchou-Ntemfack; Timoléon Crépin, Kofané

    2013-07-01

    In this work, we investigate the dynamics of modulated waves non-identical coupled nonlinear transmission lines. Traditional methods for avoiding mode mixing in identical coupled nonlinear electrical lines consist of adding the same number of linear inductors in each branch. Adding linear inductors in a single line leads to asymmetric coupled nonlinear electrical transmission lines which propagate the signal and the mode mixing. On one hand, the difference between the two lines induced the fission for only one mode of propagation. This fission is influenced by the amplitude of the signal and the amount of the input energy as well; it also narrows the width of the input pulse soliton, leading to a possible increasing of the bit rate. On the other hand, the dissymmetry of the two lines converts the network into a good amplifier for the ω_ mode which corresponds to the regime admitting low frequencies.

  19. Fractional analysis for nonlinear electrical transmission line and nonlinear Schroedinger equations with incomplete sub-equation

    NASA Astrophysics Data System (ADS)

    Fendzi-Donfack, Emmanuel; Nguenang, Jean Pierre; Nana, Laurent

    2018-02-01

    We use the fractional complex transform with the modified Riemann-Liouville derivative operator to establish the exact and generalized solutions of two fractional partial differential equations. We determine the solutions of fractional nonlinear electrical transmission lines (NETL) and the perturbed nonlinear Schroedinger (NLS) equation with the Kerr law nonlinearity term. The solutions are obtained for the parameters in the range (0<α≤1) of the derivative operator and we found the traditional solutions for the limiting case of α =1. We show that according to the modified Riemann-Liouville derivative, the solutions found can describe physical systems with memory effect, transient effects in electrical systems and nonlinear transmission lines, and other systems such as optical fiber.

  20. Automated manual transmission clutch controller

    DOEpatents

    Lawrie, Robert E.; Reed, Jr., Richard G.; Rausen, David J.

    1999-11-30

    A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

  1. The Resilient Infrastructure Initiative

    DOE PAGES

    Clifford, Megan

    2016-10-01

    Infrastructure is, by design, largely unnoticed until it breaks down and services fail. This includes water supplies, gas pipelines, bridges and dams, phone lines and cell towers, roads and culverts, railways, and the electric grid—all of the complex systems that keep our societies and economies running. Climate change, population growth, increased urbanization, system aging, and outdated design standards stress existing infrastructure and its ability to satisfy the rapidly changing demands from users. Here, the resilience of both physical and cyber infrastructure systems, however, is critical to a community as it prepares for, responds to, and recovers from a disaster, whethermore » natural or man-made.« less

  2. Fabrication and electric measurements of nanostructures inside transmission electron microscope.

    PubMed

    Chen, Qing; Peng, Lian-Mao

    2011-06-01

    Using manipulation holders specially designed for transmission electron microscope (TEM), nanostructures can be characterized, measured, modified and even fabricated in-situ. In-situ TEM techniques not only enable real-time study of structure-property relationships of materials at atomic scale, but also provide the ability to control and manipulate materials and structures at nanoscale. This review highlights in-situ electric measurements and in-situ fabrication and structure modification using manipulation holder inside TEM. Copyright © 2011 Elsevier B.V. All rights reserved.

  3. Interface Control Document for the EMPACT Module that Estimates Electric Power Transmission System Response to EMP-Caused Damage

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Werley, Kenneth Alan; Mccown, Andrew William

    The EPREP code is designed to evaluate the effects of an Electro-Magnetic Pulse (EMP) on the electric power transmission system. The EPREP code embodies an umbrella framework that allows a user to set up analysis conditions and to examine analysis results. The code links to three major physics/engineering modules. The first module describes the EM wave in space and time. The second module evaluates the damage caused by the wave on specific electric power (EP) transmission system components. The third module evaluates the consequence of the damaged network on its (reduced) ability to provide electric power to meet demand. Thismore » third module is the focus of the present paper. The EMPACT code serves as the third module. The EMPACT name denotes EMP effects on Alternating Current Transmission systems. The EMPACT algorithms compute electric power transmission network flow solutions under severely damaged network conditions. Initial solutions are often characterized by unacceptible network conditions including line overloads and bad voltages. The EMPACT code contains algorithms to adjust optimally network parameters to eliminate network problems while minimizing outages. System adjustments include automatically adjusting control equipment (generator V control, variable transformers, and variable shunts), as well as non-automatic control of generator power settings and minimal load shedding. The goal is to evaluate the minimal loss of customer load under equilibrium (steady-state) conditions during peak demand.« less

  4. Analytical modeling of a sandwiched plate piezoelectric transformer-based acoustic-electric transmission channel.

    PubMed

    Lawry, Tristan J; Wilt, Kyle R; Scarton, Henry A; Saulnier, Gary J

    2012-11-01

    The linear propagation of electromagnetic and dilatational waves through a sandwiched plate piezoelectric transformer (SPPT)-based acoustic-electric transmission channel is modeled using the transfer matrix method with mixed-domain two-port ABCD parameters. This SPPT structure is of great interest because it has been explored in recent years as a mechanism for wireless transmission of electrical signals through solid metallic barriers using ultrasound. The model we present is developed to allow for accurate channel performance prediction while greatly reducing the computational complexity associated with 2- and 3-dimensional finite element analysis. As a result, the model primarily considers 1-dimensional wave propagation; however, approximate solutions for higher-dimensional phenomena (e.g., diffraction in the SPPT's metallic core layer) are also incorporated. The model is then assessed by comparing it to the measured wideband frequency response of a physical SPPT-based channel from our previous work. Very strong agreement between the modeled and measured data is observed, confirming the accuracy and utility of the presented model.

  5. Transmission Line Security Monitor

    ScienceCinema

    None

    2017-12-09

    The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

  6. 6 CFR 29.7 - Safeguarding of Protected Critical Infrastructure Information.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... prevents unauthorized retrieval, such as shredding or incineration. (f) Transmission of information. PCII... Infrastructure Information. 29.7 Section 29.7 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY PROTECTED CRITICAL INFRASTRUCTURE INFORMATION § 29.7 Safeguarding of Protected Critical...

  7. 6 CFR 29.7 - Safeguarding of Protected Critical Infrastructure Information.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... prevents unauthorized retrieval, such as shredding or incineration. (f) Transmission of information. PCII... Infrastructure Information. 29.7 Section 29.7 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY PROTECTED CRITICAL INFRASTRUCTURE INFORMATION § 29.7 Safeguarding of Protected Critical...

  8. 6 CFR 29.7 - Safeguarding of Protected Critical Infrastructure Information.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... prevents unauthorized retrieval, such as shredding or incineration. (f) Transmission of information. PCII... Infrastructure Information. 29.7 Section 29.7 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY PROTECTED CRITICAL INFRASTRUCTURE INFORMATION § 29.7 Safeguarding of Protected Critical...

  9. 6 CFR 29.7 - Safeguarding of Protected Critical Infrastructure Information.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... prevents unauthorized retrieval, such as shredding or incineration. (f) Transmission of information. PCII... Infrastructure Information. 29.7 Section 29.7 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY PROTECTED CRITICAL INFRASTRUCTURE INFORMATION § 29.7 Safeguarding of Protected Critical...

  10. 6 CFR 29.7 - Safeguarding of Protected Critical Infrastructure Information.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... prevents unauthorized retrieval, such as shredding or incineration. (f) Transmission of information. PCII... Infrastructure Information. 29.7 Section 29.7 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY PROTECTED CRITICAL INFRASTRUCTURE INFORMATION § 29.7 Safeguarding of Protected Critical...

  11. Retail Infrastructure Costs Comparison for Hydrogen and Electricity for Light-Duty Vehicles: Preprint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Melaina, M.; Sun, Y.; Bush, B.

    2014-08-01

    Both hydrogen and plug-in electric vehicles offer significant social benefits to enhance energy security and reduce criteria and greenhouse gas emissions from the transportation sector. However, the rollout of electric vehicle supply equipment (EVSE) and hydrogen retail stations (HRS) requires substantial investments with high risks due to many uncertainties. We compare retail infrastructure costs on a common basis - cost per mile, assuming fueling service to 10% of all light-duty vehicles in a typical 1.5 million person city in 2025. Our analysis considers three HRS sizes, four distinct types of EVSE and two distinct EVSE scenarios. EVSE station costs, includingmore » equipment and installation, are assumed to be 15% less than today's costs. We find that levelized retail capital costs per mile are essentially indistinguishable given the uncertainty and variability around input assumptions. Total fuel costs per mile for battery electric vehicle (BEV) and plug-in hybrid vehicle (PHEV) are, respectively, 21% lower and 13% lower than that for hydrogen fuel cell electric vehicle (FCEV) under the home-dominant scenario. Including fuel economies and vehicle costs makes FCEVs and BEVs comparable in terms of costs per mile, and PHEVs are about 10% less than FCEVs and BEVs. To account for geographic variability in energy prices and hydrogen delivery costs, we use the Scenario Evaluation, Regionalization and Analysis (SERA) model and confirm the aforementioned estimate of cost per mile, nationally averaged, but see a 15% variability in regional costs of FCEVs and a 5% variability in regional costs for BEVs.« less

  12. The impact of range anxiety and home, workplace, and public charging infrastructure on simulated battery electric vehicle lifetime utility

    NASA Astrophysics Data System (ADS)

    Neubauer, Jeremy; Wood, Eric

    2014-07-01

    Battery electric vehicles (BEVs) offer the potential to reduce both oil imports and greenhouse gas emissions, but have a limited utility due to factors including driver range anxiety and access to charging infrastructure. In this paper we apply NREL's Battery Lifetime Analysis and Simulation Tool for Vehicles (BLAST-V) to examine the sensitivity of BEV utility to range anxiety and different charging infrastructure scenarios, including variable time schedules, power levels, and locations (home, work, and public installations). We find that the effects of range anxiety can be significant, but are reduced with access to additional charging infrastructure. We also find that (1) increasing home charging power above that provided by a common 15 A, 120 V circuit offers little added utility, (2) workplace charging offers significant utility benefits to select high mileage commuters, and (3) broadly available public charging can bring many lower mileage drivers to near-100% utility while strongly increasing the achieved miles of high mileage drivers.

  13. Multilayered Functional Insulation System (MFIS) for AC Power Transmission in High Voltage Hybrid Electrical Propulsion

    NASA Technical Reports Server (NTRS)

    Lizcano, Maricela

    2017-01-01

    High voltage hybrid electric propulsion systems are now pushing new technology development efforts for air transportation. A key challenge in hybrid electric aircraft is safe high voltage distribution and transmission of megawatts of power (>20 MW). For the past two years, a multidisciplinary materials research team at NASA Glenn Research Center has investigated the feasibility of distributing high voltage power on future hybrid electric aircraft. This presentation describes the team's approach to addressing this challenge, significant technical findings, and next steps in GRC's materials research effort for MW power distribution on aircraft.

  14. Complex Networks and Critical Infrastructures

    NASA Astrophysics Data System (ADS)

    Setola, Roberto; de Porcellinis, Stefano

    The term “Critical Infrastructures” indicates all those technological infrastructures such as: electric grids, telecommunication networks, railways, healthcare systems, financial circuits, etc. that are more and more relevant for the welfare of our countries. Each one of these infrastructures is a complex, highly non-linear, geographically dispersed cluster of systems, that interact with their human owners, operators, users and with the other infrastructures. Their augmented relevance and the actual political and technological scenarios, which have increased their exposition to accidental failure and deliberate attacks, demand for different and innovative protection strategies (generally indicate as CIP - Critical Infrastructure Protection). To this end it is mandatory to understand the mechanisms that regulate the dynamic of these infrastructures. In this framework, an interesting approach is those provided by the complex networks. In this paper we illustrate some results achieved considering structural and functional properties of the corresponding topological networks both when each infrastructure is assumed as an autonomous system and when we take into account also the dependencies existing among the different infrastructures.

  15. Overhead electric power transmission line jumpering system for bundles of five or more subconductors

    DOEpatents

    Winkelman, Paul F.

    1982-01-01

    Jumpering of electric power transmission lines at a dead end tower. Two transmission line conductor bundles each contain five or more spaced apart subconductors (5) arranged in the shape of a cylinder having a circular cross section. The ends of each bundle of subconductors are attached with insulators to a dead end tower (1). Jumpering allows the electric current to flow between the two bundles of subconductors using jumper buses, internal jumper conductors, and external jumper conductors. One or more current collecting jumper buses (37) are located inside each bundle of subconductors with each jumper bus being attached to the end of a subconductor. Small-diameter internal jumper conductors (33) are located in the inherently electrically shielded area inside each bundle of subconductors with each subconductor (except ones having an attached jumper bus) having one internal jumper conductor connected between that subconductor's end and a jumper bus. Large-diameter external jumper conductors (9) are located outside each bundle of subconductors with one or more external jumper conductors being connected between the jumper buses in one bundle of subconductors and the jumper buses in the other bundle.

  16. Decision support for mitigating the risk of tree induced transmission line failure in utility rights-of-way.

    PubMed

    Poulos, H M; Camp, A E

    2010-02-01

    Vegetation management is a critical component of rights-of-way (ROW) maintenance for preventing electrical outages and safety hazards resulting from tree contact with conductors during storms. Northeast Utility's (NU) transmission lines are a critical element of the nation's power grid; NU is therefore under scrutiny from federal agencies charged with protecting the electrical transmission infrastructure of the United States. We developed a decision support system to focus right-of-way maintenance and minimize the potential for a tree fall episode that disables transmission capacity across the state of Connecticut. We used field data on tree characteristics to develop a system for identifying hazard trees (HTs) in the field using limited equipment to manage Connecticut power line ROW. Results from this study indicated that the tree height-to-diameter ratio, total tree height, and live crown ratio were the key characteristics that differentiated potential risk trees (danger trees) from trees with a high probability of tree fall (HTs). Products from this research can be transferred to adaptive right-of-way management, and the methods we used have great potential for future application to other regions of the United States and elsewhere where tree failure can disrupt electrical power.

  17. Automated manual transmission shift sequence controller

    DOEpatents

    Lawrie, Robert E.; Reed, Richard G.; Rausen, David J.

    2000-02-01

    A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both, an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

  18. Automated manual transmission mode selection controller

    DOEpatents

    Lawrie, Robert E.

    1999-11-09

    A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

  19. Air quality and climate benefits of long-distance electricity transmission in China

    NASA Astrophysics Data System (ADS)

    Peng, Wei; Yuan, Jiahai; Zhao, Yu; Lin, Meiyun; Zhang, Qiang; Victor, David G.; Mauzerall, Denise L.

    2017-06-01

    China is the world’s top carbon emitter and suffers from severe air pollution. It has recently made commitments to improve air quality and to peak its CO2 emissions by 2030. We examine one strategy that can potentially address both issues—utilizing long-distance electricity transmission to bring renewable power to the polluted eastern provinces. Based on an integrated assessment using state-of-the-science atmospheric modeling and recent epidemiological evidence, we find that transmitting a hybrid of renewable (60%) and coal power (40%) (Hybrid-by-wire) reduces 16% more national air-pollution-associated deaths and decreases three times more carbon emissions than transmitting only coal-based electricity. Moreover, although we find that transmitting coal power (Coal-by-Wire, CbW) is slightly more effective at reducing air pollution impacts than replacing old coal power plants with newer cleaner ones in the east (Coal-by-Rail, CbR) (CbW achieves a 6% greater reduction in national total air-pollution-related mortalities than CbR), both coal scenarios have approximately the same carbon emissions. We thus demonstrate that coordinating transmission planning with renewable energy deployment is critical to maximize both local air quality benefits and global climate benefits.

  20. Planning Electric Transmission Lines: A Review of Recent Regional Transmission Plans

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Eto, Joseph H.

    The first Quadrennial Energy Review (QER) recommends that the U.S. Department of Energy (DOE) conduct a national review of transmission plans and assess the barriers and incentives to their implementation. DOE tasked Lawrence Berkeley National Laboratory (LBNL) to prepare two reports to support the agency’s response to this recommendation. This report reviews regional transmission plans and regional transmission planning processes that have been directed by Federal Energy Regulatory Commission (FERC) Order Nos. 890 and 1000. We focus on the most recent regional transmission plans (those issued in 2015 and through approximately mid-year 2016) and current regional transmission planning processes. Amore » companion report focuses on non-plan-related factors that affect transmission projects.« less

  1. National Plug-In Electric Vehicle Infrastructure Analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wood, Eric; Rames, Clement; Muratori, Matteo

    This report addresses the fundamental question of how much plug-in electric vehicle (PEV) charging infrastructure—also known as electric vehicle supply equipment (EVSE)—is needed in the United States to support both plug-in hybrid electric vehicles (PHEVs) and battery electric vehicles (BEVs).

  2. Electric Current Transmission Through Tissues of the Vestibular Labyrinth of a Patient: Perfection of the Vestibular Implant

    NASA Astrophysics Data System (ADS)

    Demkin, V. P.; Shchetinin, P. P.; Melnichuk, S. V.; Kingma, H.; Van de Berg, R.; Pleshkov, M. O.; Starkov, D. N.

    2018-03-01

    An electric model of current transmission through tissues of the vestibular labyrinth of a patient is suggested. To stimulate directly the vestibular nerve in surgical operation, terminations of the electrodes are implanted through the bone tissue of the labyrinth into the perilymph in the vicinity of the vestibular nerve. The biological tissue of the vestibular labyrinth surrounding the electrodes and having heterogeneous composition possesses conductive and dielectric properties. Thus, when a current pulse from the vestibular implant is applied to one of the electrodes, conductive disturbance currents may arise between the electrodes and the vestibular nerves that can significantly deteriorate the direct signal quality. To study such signals and to compensate for the conductive disturbance currents, an equivalent electric circuit with actual electric impedance properties of tissues of the vestibular system is suggested, and the time parameters of the conductive disturbance current transmission are calculated. It is demonstrated that these parameters can reach large values. The suggested electric model and the results of calculations can be used for perfection of the vestibular implant.

  3. ITER Cryoplant Infrastructures

    NASA Astrophysics Data System (ADS)

    Fauve, E.; Monneret, E.; Voigt, T.; Vincent, G.; Forgeas, A.; Simon, M.

    2017-02-01

    The ITER Tokamak requires an average 75 kW of refrigeration power at 4.5 K and 600 kW of refrigeration Power at 80 K to maintain the nominal operation condition of the ITER thermal shields, superconducting magnets and cryopumps. This is produced by the ITER Cryoplant, a complex cluster of refrigeration systems including in particular three identical Liquid Helium Plants and two identical Liquid Nitrogen Plants. Beyond the equipment directly part of the Cryoplant, colossal infrastructures are required. These infrastructures account for a large part of the Cryoplants lay-out, budget and engineering efforts. It is ITER Organization responsibility to ensure that all infrastructures are adequately sized and designed to interface with the Cryoplant. This proceeding presents the overall architecture of the cryoplant. It provides order of magnitude related to the cryoplant building and utilities: electricity, cooling water, heating, ventilation and air conditioning (HVAC).

  4. Connecting Colorado's Renewable Resources to the Markets in a Cabon-Constrained Electricity Sector

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2009-12-31

    electric power in the state from 10 Colorado generation development areas (GDAs) that have the capacity for more than 96,000 megawatts (MW) of wind generation and 26,000 MW of solar generation. The SB07-91 Report recognized that only a small fraction of these large capacity opportunities are destined to be developed. As a rough comparison, 13,964 MW of installed nameplate capacity was available in Colorado in 2008. The legislature did not direct the SB07-91 task force to examine several issues that are addressed in the REDI report. These issues include topics such as transmission, regulation, wildlife, land use, permitting, electricity demand, and the roles that different combinations of supply-side resources, demand-side resources, and transmission can play to meet a CO{sub 2} emissions reduction goal. This report, which expands upon research from a wide array of sources, serves as a sequel to the SB07-91 Report. Reports and research on renewable energy and transmission abound. This report builds on the work of many, including professionals who have dedicated their careers to these topics. A bibliography of information resources is provided, along with many citations to the work of others. The REDI Project was designed to present baseline information regarding the current status of Colorado's generation and transmission infrastructure. The report discusses proposals to expand the infrastructure, and identifies opportunities to make further improvements in the state's regulatory and policy environment. The report offers a variety of options for consideration as Colorado seeks pathways to meet the 20 x 20 goal. The primary goal of the report is to foster broader discussion regarding how the 20 x 20 goal interacts with electric resource portfolio choices, particularly the expansion of utility-scale renewable energy and the high-voltage transmission infrastructure. The report also is intended to serve as a resource when identifying opportunities stemming from the American

  5. Country-Level Life Cycle Assessment of Greenhouse Gas Emissions from Liquefied Natural Gas Trade for Electricity Generation.

    PubMed

    Kasumu, Adebola S; Li, Vivian; Coleman, James W; Liendo, Jeanne; Jordaan, Sarah M

    2018-02-20

    In the determination of the net impact of liquefied natural gas (LNG) on greenhouse gas emissions, life cycle assessments (LCA) of electricity generation have yet to combine the effects of transport distances between exporting and importing countries, country-level infrastructure in importing countries, and the fuel sources displaced in importing countries. To address this, we conduct a LCA of electricity generated from LNG export from British Columbia, Canada with a three-step approach: (1) a review of viable electricity generation markets for LNG, (2) the development of results for greenhouse gas emissions that account for transport to importing nations as well as the infrastructure required for power generation and delivery, and (3) emissions displacement scenarios to test assumptions about what electricity is being displaced in the importing nation. Results show that while the ultimate magnitude of the greenhouse gas emissions associated with natural gas production systems is still unknown, life cycle greenhouse gas emissions depend on country-level infrastructure (specifically, the efficiency of the generation fleet, transmission and distribution losses and LNG ocean transport distances) as well as the assumptions on what is displaced in the domestic electricity generation mix. Exogenous events such as the Fukushima nuclear disaster have unanticipated effects on the emissions displacement results. We highlight national regulations, environmental policies, and multilateral agreements that could play a role in mitigating emissions.

  6. The value of compressed air energy storage with wind in transmission-constrained electric power systems

    DOE PAGES

    Denholm, Paul; Sioshansi, Ramteen

    2009-05-05

    In this paper, we examine the potential advantages of co-locating wind and energy storage to increase transmission utilization and decrease transmission costs. Co-location of wind and storage decreases transmission requirements, but also decreases the economic value of energy storage compared to locating energy storage at the load. This represents a tradeoff which we examine to estimate the transmission costs required to justify moving storage from load-sited to wind-sited in three different locations in the United States. We examined compressed air energy storage (CAES) in three “wind by wire” scenarios with a variety of transmission and CAES sizes relative to amore » given amount of wind. In the sites and years evaluated, the optimal amount of transmission ranges from 60% to 100% of the wind farm rating, with the optimal amount of CAES equal to 0–35% of the wind farm rating, depending heavily on wind resource, value of electricity in the local market, and the cost of natural gas.« less

  7. Down hole transmission system

    DOEpatents

    Hall, David R [Provo, UT; Hall, Jr., H. Tracy

    2007-07-24

    A transmission system in a downhole component comprises a data transmission element in both ends of the downhole component. Each data transmission element houses an electrically conducting coil in a MCEI circular trough. The electrically conducting coil comprises at least two generally fractional loops. In the preferred embodiment, the transmission elements are connected by an electrical conductor. Preferably, the electrical conductor is a coaxial cable. Preferably, the MCEI trough comprises ferrite. In the preferred embodiment, the fractional loops are connected by a connecting cable. In one aspect of the present invention, the connecting cable is a pair of twisted wires. In one embodiment the connecting cable is a shielded pair of twisted wires. In another aspect of the present invention, the connecting cable is a coaxial cable. The connecting cable may be disposed outside of the MCEI circular trough.

  8. NIOSH testimony to DOL on the Occupational Safety and Health Administration's proposed rule on electric power generation, transmission, and distribution; electrical protective equipment by J. D. Millar, November 28, 1989

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1989-11-28

    The testimony concerns the support of NIOSH for the OSHA proposed rule on Electric Power Generation, Transmission and Distribution. NIOSH in particular comments on control of hazardous energy, cardiopulmonary resuscitation, line mechanics, and enclosed spaces. NIOSH estimates that 80 to 90% of the fatalities occurring in the industry occur among line mechanics. NIOSH strongly supports OSHA in applying the standard both electric utility companies and to power generation, transmission and distribution installations not under control of electric utilities. In addition to evaluating electrocutions to find effective ways for workers to avoid electrical injury or fatality, NIOSH has published recommendations formore » providing emergency medical care when workers do inadvertently contact electrical energy. NIOSH is not aware of any epidemiologic study which collected sufficient data to directly address the issue of successful resuscitation following contact with electrical energy. A review of pertinent epidemiologic studies and standard medical practice supports the NIOSH recommendation that workers who may contact energized electrical circuit work in pairs and that both members of the team be trained in cardiopulmonary resuscitation.« less

  9. The load shift potential of plug-in electric vehicles with different amounts of charging infrastructure

    NASA Astrophysics Data System (ADS)

    Gnann, Till; Klingler, Anna-Lena; Kühnbach, Matthias

    2018-06-01

    Plug-in electric vehicles are the currently favoured option to decarbonize the passenger car sector. However, a decarbonisation is only possible with electricity from renewable energies and plug-in electric vehicles might cause peak loads if they started to charge at the same time. Both these issues could be solved with coordinated load shifting (demand response). Previous studies analyzed this research question by focusing on private vehicles with domestic and work charging infrastructure. This study additionally includes the important early adopter group of commercial fleet vehicles and reflects the impact of domestic, commercial, work and public charging. For this purpose, two models are combined. In a comparison of three scenarios, we find that charging of commercial vehicles does not inflict evening load peaks in the same magnitude as purely domestic charging of private cars does. Also for private cars, charging at work occurs during the day and may reduce the necessity of load shifting while public charging plays a less important role in total charging demand as well as load shifting potential. Nonetheless, demand response reduces the system load by about 2.2 GW or 2.8% when domestic and work charging are considered compared to a scenario with only domestic charging.

  10. The Emerging Interdependence of the Electric Power Grid & Information and Communication Technology

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Taft, Jeffrey D.; Becker-Dippmann, Angela S.

    2015-08-01

    This paper examines the implications of emerging interdependencies between the electric power grid and Information and Communication Technology (ICT). Over the past two decades, electricity and ICT infrastructure have become increasingly interdependent, driven by a combination of factors including advances in sensor, network and software technologies and progress in their deployment, the need to provide increasing levels of wide-area situational awareness regarding grid conditions, and the promise of enhanced operational efficiencies. Grid operators’ ability to utilize new and closer-to-real-time data generated by sensors throughout the system is providing early returns, particularly with respect to management of the transmission system formore » purposes of reliability, coordination, congestion management, and integration of variable electricity resources such as wind generation.« less

  11. CERTS: Consortium for Electric Reliability Technology Solutions - Research Highlights

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Eto, Joseph

    2003-07-30

    Historically, the U.S. electric power industry was vertically integrated, and utilities were responsible for system planning, operations, and reliability management. As the nation moves to a competitive market structure, these functions have been disaggregated, and no single entity is responsible for reliability management. As a result, new tools, technologies, systems, and management processes are needed to manage the reliability of the electricity grid. However, a number of simultaneous trends prevent electricity market participants from pursuing development of these reliability tools: utilities are preoccupied with restructuring their businesses, research funding has declined, and the formation of Independent System Operators (ISOs) andmore » Regional Transmission Organizations (RTOs) to operate the grid means that control of transmission assets is separate from ownership of these assets; at the same time, business uncertainty, and changing regulatory policies have created a climate in which needed investment for transmission infrastructure and tools for reliability management has dried up. To address the resulting emerging gaps in reliability R&D, CERTS has undertaken much-needed public interest research on reliability technologies for the electricity grid. CERTS' vision is to: (1) Transform the electricity grid into an intelligent network that can sense and respond automatically to changing flows of power and emerging problems; (2) Enhance reliability management through market mechanisms, including transparency of real-time information on the status of the grid; (3) Empower customers to manage their energy use and reliability needs in response to real-time market price signals; and (4) Seamlessly integrate distributed technologies--including those for generation, storage, controls, and communications--to support the reliability needs of both the grid and individual customers.« less

  12. Calculation and application of energy transaction allocation factors in electric power transmission systems

    NASA Astrophysics Data System (ADS)

    Fradi, Aniss

    The ability to allocate the active power (MW) loading on transmission lines and transformers, is the basis of the "flow based" transmission allocation system developed by the North American Electric Reliability Council. In such a system, the active power flows must be allocated to each line or transformer in proportion to the active power being transmitted by each transaction imposed on the system. Currently, this is accomplished through the use of the linear Power Transfer Distribution Factors (PTDFs). Unfortunately, no linear allocation models exist for other energy transmission quantities, such as MW and MVAR losses, MVAR and MVA flows, etc. Early allocation schemes were developed to allocate MW losses due to transactions to branches in a transmission system, however they exhibited diminished accuracy, since most of them are based on linear power flow modeling of the transmission system. This thesis presents a new methodology to calculate Energy Transaction Allocation factors (ETA factors, or eta factors), using the well-known process of integration of a first derivative function, as well as consistent and well-established mathematical and AC power flow models. The factors give a highly accurate allocation of any non-linear system quantity to transactions placed on the transmission system. The thesis also extends the new ETA factors calculation procedure to restructure a new economic dispatch scheme where multiple sets of generators are economically dispatched to meet their corresponding load and their share of the losses.

  13. 75 FR 43519 - Parker-Davis Project; Transmission Capacity for Renewable Energy Between Electrical District No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-26

    ... for Renewable Energy Between Electrical District No. 5 Substation and the Palo Verde Hub AGENCY... transmission service on the P- DP for the purpose of transmitting renewable energy. Specifically, Western is soliciting interest from entities looking to transfer renewable energy from the area south of Phoenix...

  14. Enabling fast charging - Infrastructure and economic considerations

    NASA Astrophysics Data System (ADS)

    Burnham, Andrew; Dufek, Eric J.; Stephens, Thomas; Francfort, James; Michelbacher, Christopher; Carlson, Richard B.; Zhang, Jiucai; Vijayagopal, Ram; Dias, Fernando; Mohanpurkar, Manish; Scoffield, Don; Hardy, Keith; Shirk, Matthew; Hovsapian, Rob; Ahmed, Shabbir; Bloom, Ira; Jansen, Andrew N.; Keyser, Matthew; Kreuzer, Cory; Markel, Anthony; Meintz, Andrew; Pesaran, Ahmad; Tanim, Tanvir R.

    2017-11-01

    The ability to charge battery electric vehicles (BEVs) on a time scale that is on par with the time to fuel an internal combustion engine vehicle (ICEV) would remove a significant barrier to the adoption of BEVs. However, for viability, fast charging at this time scale needs to also occur at a price that is acceptable to consumers. Therefore, the cost drivers for both BEV owners and charging station providers are analyzed. In addition, key infrastructure considerations are examined, including grid stability and delivery of power, the design of fast charging stations and the design and use of electric vehicle service equipment. Each of these aspects have technical barriers that need to be addressed, and are directly linked to economic impacts to use and implementation. This discussion focuses on both the economic and infrastructure issues which exist and need to be addressed for the effective implementation of fast charging at 400 kW and above. In so doing, it has been found that there is a distinct need to effectively manage the intermittent, high power demand of fast charging, strategically plan infrastructure corridors, and to further understand the cost of operation of charging infrastructure and BEVs.

  15. Unusual Electric Burns Caused by Communication Disc Contact with a High-voltage Electric Transmission Cable: a Potential Occupational Hazard

    PubMed Central

    Fadeyibi, I.O.; Izegbu, M.C.; Benebo, A.S.; Ademuluyi, S.A.

    2007-01-01

    Summary The case reported is that of a communications technician admitted to hospital with 38% burns sustained while climbing a communications mast. The mast was erected less than 3 metres from a 33 kv electric transmission cable. His condition is described, as also the treatment he received until his discharge three months later. In the absence of guidelines regarding the erection of such masts, a number of recommendations are made. PMID:21991082

  16. Collaborative Access Control For Critical Infrastructures

    NASA Astrophysics Data System (ADS)

    Baina, Amine; El Kalam, Anas Abou; Deswarte, Yves; Kaaniche, Mohamed

    A critical infrastructure (CI) can fail with various degrees of severity due to physical and logical vulnerabilities. Since many interdependencies exist between CIs, failures can have dramatic consequences on the entire infrastructure. This paper focuses on threats that affect information and communication systems that constitute the critical information infrastructure (CII). A new collaborative access control framework called PolyOrBAC is proposed to address security problems that are specific to CIIs. The framework offers each organization participating in a CII the ability to collaborate with other organizations while maintaining control of its resources and internal security policy. The approach is demonstrated on a practical scenario involving the electrical power grid.

  17. Modeling joint restoration strategies for interdependent infrastructure systems

    PubMed Central

    Simonovic, Slobodan P.

    2018-01-01

    Life in the modern world depends on multiple critical services provided by infrastructure systems which are interdependent at multiple levels. To effectively respond to infrastructure failures, this paper proposes a model for developing optimal joint restoration strategy for interdependent infrastructure systems following a disruptive event. First, models for (i) describing structure of interdependent infrastructure system and (ii) their interaction process, are presented. Both models are considering the failure types, infrastructure operating rules and interdependencies among systems. Second, an optimization model for determining an optimal joint restoration strategy at infrastructure component level by minimizing the economic loss from the infrastructure failures, is proposed. The utility of the model is illustrated using a case study of electric-water systems. Results show that a small number of failed infrastructure components can trigger high level failures in interdependent systems; the optimal joint restoration strategy varies with failure occurrence time. The proposed models can help decision makers to understand the mechanisms of infrastructure interactions and search for optimal joint restoration strategy, which can significantly enhance safety of infrastructure systems. PMID:29649300

  18. Modeling joint restoration strategies for interdependent infrastructure systems.

    PubMed

    Zhang, Chao; Kong, Jingjing; Simonovic, Slobodan P

    2018-01-01

    Life in the modern world depends on multiple critical services provided by infrastructure systems which are interdependent at multiple levels. To effectively respond to infrastructure failures, this paper proposes a model for developing optimal joint restoration strategy for interdependent infrastructure systems following a disruptive event. First, models for (i) describing structure of interdependent infrastructure system and (ii) their interaction process, are presented. Both models are considering the failure types, infrastructure operating rules and interdependencies among systems. Second, an optimization model for determining an optimal joint restoration strategy at infrastructure component level by minimizing the economic loss from the infrastructure failures, is proposed. The utility of the model is illustrated using a case study of electric-water systems. Results show that a small number of failed infrastructure components can trigger high level failures in interdependent systems; the optimal joint restoration strategy varies with failure occurrence time. The proposed models can help decision makers to understand the mechanisms of infrastructure interactions and search for optimal joint restoration strategy, which can significantly enhance safety of infrastructure systems.

  19. Advanced Metering Infrastructure based on Smart Meters

    NASA Astrophysics Data System (ADS)

    Suzuki, Hiroshi

    By specifically designating penetrations rates of advanced meters and communication technologies, devices and systems, this paper introduces that the penetration of advanced metering is important for the future development of electric power system infrastructure. It examines the state of the technology and the economical benefits of advanced metering. One result of the survey is that advanced metering currently has a penetration of about six percent of total installed electric meters in the United States. Applications to the infrastructure differ by type of organization. Being integrated with emerging communication technologies, smart meters enable several kinds of features such as, not only automatic meter reading but also distribution management control, outage management, remote switching, etc.

  20. Wind power development in the United States: Effects of policies and electricity transmission congestion

    NASA Astrophysics Data System (ADS)

    Hitaj, Claudia

    In this dissertation, I analyze the drivers of wind power development in the United States as well as the relationship between renewable power plant location and transmission congestion and emissions levels. I first examine the role of government renewable energy incentives and access to the electricity grid on investment in wind power plants across counties from 1998-2007. The results indicate that the federal production tax credit, state-level sales tax credit and production incentives play an important role in promoting wind power. In addition, higher wind power penetration levels can be achieved by bringing more parts of the electricity transmission grid under independent system operator regulation. I conclude that state and federal government policies play a significant role in wind power development both by providing financial support and by improving physical and procedural access to the electricity grid. Second, I examine the effect of renewable power plant location on electricity transmission congestion levels and system-wide emissions levels in a theoretical model and a simulation study. A new renewable plant takes the effect of congestion on its own output into account, but ignores the effect of its marginal contribution to congestion on output from existing plants, which results in curtailment of renewable power. Though pricing congestion removes the externality and reduces curtailment, I find that in the absence of a price on emissions, pricing congestion may in some cases actually increase system-wide emissions. The final part of my dissertation deals with an econometric issue that emerged from the empirical analysis of the drivers of wind power. I study the effect of the degree of censoring on random-effects Tobit estimates in finite sample with a particular focus on severe censoring, when the percentage of uncensored observations reaches 1 to 5 percent. The results show that the Tobit model performs well even at 5 percent uncensored observations

  1. 76 FR 30869 - Promoting Transmission Investment Through Pricing Reform

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-27

    ...] Promoting Transmission Investment Through Pricing Reform May 19, 2011. AGENCY: Federal Energy Regulatory... investment in over $50 billion in proposed transmission infrastructure to ensure reliability or to reduce the... varied. \\1\\ Promoting Transmission Investment through Pricing Reform, Order No. 679, 71 FR 43294 (Jul. 31...

  2. An assessment of electric vehicles: technology, infrastructure requirements, greenhouse-gas emissions, petroleum use, material use, lifetime cost, consumer acceptance and policy initiatives.

    PubMed

    Delucchi, M A; Yang, C; Burke, A F; Ogden, J M; Kurani, K; Kessler, J; Sperling, D

    2014-01-13

    Concerns about climate change, urban air pollution and dependence on unstable and expensive supplies of foreign oil have led policy-makers and researchers to investigate alternatives to conventional petroleum-fuelled internal-combustion-engine vehicles in transportation. Because vehicles that get some or all of their power from an electric drivetrain can have low or even zero emissions of greenhouse gases (GHGs) and urban air pollutants, and can consume little or no petroleum, there is considerable interest in developing and evaluating advanced electric vehicles (EVs), including pure battery-electric vehicles, plug-in hybrid electric vehicles and hydrogen fuel-cell electric vehicles. To help researchers and policy-makers assess the potential of EVs to mitigate climate change and reduce petroleum use, this paper discusses the technology of EVs, the infrastructure needed for their development, impacts on emissions of GHGs, petroleum use, materials use, lifetime costs, consumer acceptance and policy considerations.

  3. Power-based Shift Schedule for Pure Electric Vehicle with a Two-speed Automatic Transmission

    NASA Astrophysics Data System (ADS)

    Wang, Jiaqi; Liu, Yanfang; Liu, Qiang; Xu, Xiangyang

    2016-11-01

    This paper introduces a comprehensive shift schedule for a two-speed automatic transmission of pure electric vehicle. Considering about driving ability and efficiency performance of electric vehicles, the power-based shift schedule is proposed with three principles. This comprehensive shift schedule regards the vehicle current speed and motor load power as input parameters to satisfy the vehicle driving power demand with lowest energy consumption. A simulation model has been established to verify the dynamic and economic performance of comprehensive shift schedule. Compared with traditional dynamic and economic shift schedules, simulation results indicate that the power-based shift schedule is superior to traditional shift schedules.

  4. Measuring nanometre-scale electric fields in scanning transmission electron microscopy using segmented detectors.

    PubMed

    Brown, H G; Shibata, N; Sasaki, H; Petersen, T C; Paganin, D M; Morgan, M J; Findlay, S D

    2017-11-01

    Electric field mapping using segmented detectors in the scanning transmission electron microscope has recently been achieved at the nanometre scale. However, converting these results to quantitative field measurements involves assumptions whose validity is unclear for thick specimens. We consider three approaches to quantitative reconstruction of the projected electric potential using segmented detectors: a segmented detector approximation to differential phase contrast and two variants on ptychographical reconstruction. Limitations to these approaches are also studied, particularly errors arising from detector segment size, inelastic scattering, and non-periodic boundary conditions. A simple calibration experiment is described which corrects the differential phase contrast reconstruction to give reliable quantitative results despite the finite detector segment size and the effects of plasmon scattering in thick specimens. A plasmon scattering correction to the segmented detector ptychography approaches is also given. Avoiding the imposition of periodic boundary conditions on the reconstructed projected electric potential leads to more realistic reconstructions. Copyright © 2017 Elsevier B.V. All rights reserved.

  5. Decompositions of injection patterns for nodal flow allocation in renewable electricity networks

    NASA Astrophysics Data System (ADS)

    Schäfer, Mirko; Tranberg, Bo; Hempel, Sabrina; Schramm, Stefan; Greiner, Martin

    2017-08-01

    The large-scale integration of fluctuating renewable power generation represents a challenge to the technical and economical design of a sustainable future electricity system. In this context, the increasing significance of long-range power transmission calls for innovative methods to understand the emerging complex flow patterns and to integrate price signals about the respective infrastructure needs into the energy market design. We introduce a decomposition method of injection patterns. Contrary to standard flow tracing approaches, it provides nodal allocations of link flows and costs in electricity networks by decomposing the network injection pattern into market-inspired elementary import/export building blocks. We apply the new approach to a simplified data-driven model of a European electricity grid with a high share of renewable wind and solar power generation.

  6. Integrating Renewable Energy into the Transmission and Distribution System of the U. S. Virgin Islands

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burman, K.; Olis, D.; Gevorgian, V.

    2011-09-01

    This report focuses on the economic and technical feasibility of integrating renewable energy technologies into the U.S. Virgin Islands transmission and distribution systems. The report includes three main areas of analysis: 1) the economics of deploying utility-scale renewable energy technologies on St. Thomas/St. John and St. Croix; 2) potential sites for installing roof- and ground-mount PV systems and wind turbines and the impact renewable generation will have on the electrical subtransmission and distribution infrastructure, and 3) the feasibility of a 100- to 200-megawatt power interconnection of the Puerto Rico Electric Power Authority (PREPA), Virgin Islands Water and Power Authority (WAPA),more » and British Virgin Islands (BVI) grids via a submarine cable system.« less

  7. Data and material of the Safe-Range-Inventory: An assistance tool helping to improve the charging infrastructure for electric vehicles.

    PubMed

    Carbon, Claus-Christian; Gebauer, Fabian

    2017-10-01

    The Safe-Range-Inventory (SRI) was constructed in order to help public authorities to improve the charging infrastructures for electric vehicles [1; 10.1016/j.trf.2017.04.011]. Specifically, the impact of fast (vs slow) charging stations on people's range anxiety was examined. Ninety-seven electric vehicle users from Germany (81 male; M age =46.3 years, SD =12.1) were recruited to participate in the experimental design. Statistical analyses were conducted using ANOVA for repeated measures to test for interaction effects of available charging stations and remaining range with the dependent variable range anxiety . The full data set is publicly available via https://osf.io/bveyw/ (Carbon and Gebauer, 2017) [2].

  8. Human Infrastructure Detection and Exploitation (HIDE)

    DTIC Science & Technology

    2009-11-01

    Finding human infrastructure elements such as machinery, chemicals, radiofrequency emissions, electrical currents, or other evidence of human ... activity in confined enclosed spaces is a deficiency in current intelligence, surveillance, and reconnaissance (ISR) systems. In addition, operations in

  9. Modelling GIC Flow in New Zealand's Electrical Transmission Grid

    NASA Astrophysics Data System (ADS)

    Divett, T.; Thomson, A. W. P.; Ingham, M.; Rodger, C. J.; Beggan, C.; Kelly, G.

    2016-12-01

    Transformers in Transpower New Zealand Ltd's electrical grid have been impacted by geomagnetically induced currents (GIC) during geomagnetic storms, for example in November 2001. In this study we have developed an initial model of the South Island's power grid to advance understanding of the impact of GIC on New Zealand's (NZ) grid. NZ's latitude and island setting mean that modelling approaches successfully used in the UK in the past can be used. Vasseur and Weidelt's thin sheet model is applied to model the electric field as a function of magnetic field and conductance. However the 4 km deep ocean near NZ's coast compared to the UK's relatively shallow continental shelf waters restricts the range of frequency and spatial grid that can be used due to assumptions in the thin sheet model. Some early consequences of these restrictions will be discussed. Lines carrying 220kV, 110kV and 66kV make up NZ's electrical transmission grid with multiple earthing nodes at each substation. Transpower have measured DC earth currents at 17 nodes in NZ's South Island grid for 15 years, including observations at multiple transformers for some substations. Different transformers at the same substation can experience quite different GIC during space weather events. Therefore we have initially modelled each transformer in some substations separately to compare directly with measured currents.Ultimately this study aims to develop a validated modelling tool that will be used to strengthen NZ's grid against the risks of space weather. Further, mitigation tactics which could be used to reduce the threat to the electrical grid will be evaluated. In particular we will focus at the transformer level where the risk lies, and not at the substation level as has been commonly done to date. As we will validate our model against the extensive Transpower observations, this will be a valuable confirmation of the approaches used by the wider international community.

  10. Understanding the life cycle surface land requirements of natural gas-fired electricity

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jordaan, Sarah M.; Heath, Garvin A.; Macknick, Jordan

    The surface land use of fossil fuel acquisition and utilization has not been well characterized, inhibiting consistent comparisons of different electricity generation technologies. We present a method for robust estimation of the life cycle land use of electricity generated from natural gas through a case study that includes inventories of infrastructure, satellite imagery and well-level production. Approximately 500 sites in the Barnett Shale of Texas were sampled across five life cycle stages (production, gathering, processing, transmission and power generation). Total land use (0.62 m 2 MWh -1, 95% confidence intervals +/-0.01 m 2 MWh -1) was dominated by midstream infrastructure,more » particularly pipelines (74%). These results were sensitive to power plant heat rate (85-190% of the base case), facility lifetime (89-169%), number of wells per site (16-100%), well lifetime (92-154%) and pipeline right of way (58-142%). When replicated for other gas-producing regions and different fuels, our approach offers a route to enable empirically grounded comparisons of the land footprint of energy choices.« less

  11. Understanding the life cycle surface land requirements of natural gas-fired electricity

    DOE PAGES

    Jordaan, Sarah M.; Heath, Garvin A.; Macknick, Jordan; ...

    2017-10-02

    The surface land use of fossil fuel acquisition and utilization has not been well characterized, inhibiting consistent comparisons of different electricity generation technologies. We present a method for robust estimation of the life cycle land use of electricity generated from natural gas through a case study that includes inventories of infrastructure, satellite imagery and well-level production. Approximately 500 sites in the Barnett Shale of Texas were sampled across five life cycle stages (production, gathering, processing, transmission and power generation). Total land use (0.62 m 2 MWh -1, 95% confidence intervals +/-0.01 m 2 MWh -1) was dominated by midstream infrastructure,more » particularly pipelines (74%). These results were sensitive to power plant heat rate (85-190% of the base case), facility lifetime (89-169%), number of wells per site (16-100%), well lifetime (92-154%) and pipeline right of way (58-142%). When replicated for other gas-producing regions and different fuels, our approach offers a route to enable empirically grounded comparisons of the land footprint of energy choices.« less

  12. Understanding the life cycle surface land requirements of natural gas-fired electricity

    NASA Astrophysics Data System (ADS)

    Jordaan, Sarah M.; Heath, Garvin A.; Macknick, Jordan; Bush, Brian W.; Mohammadi, Ehsan; Ben-Horin, Dan; Urrea, Victoria; Marceau, Danielle

    2017-10-01

    The surface land use of fossil fuel acquisition and utilization has not been well characterized, inhibiting consistent comparisons of different electricity generation technologies. Here we present a method for robust estimation of the life cycle land use of electricity generated from natural gas through a case study that includes inventories of infrastructure, satellite imagery and well-level production. Approximately 500 sites in the Barnett Shale of Texas were sampled across five life cycle stages (production, gathering, processing, transmission and power generation). Total land use (0.62 m2 MWh-1, 95% confidence intervals ±0.01 m2 MWh-1) was dominated by midstream infrastructure, particularly pipelines (74%). Our results were sensitive to power plant heat rate (85-190% of the base case), facility lifetime (89-169%), number of wells per site (16-100%), well lifetime (92-154%) and pipeline right of way (58-142%). When replicated for other gas-producing regions and different fuels, our approach offers a route to enable empirically grounded comparisons of the land footprint of energy choices.

  13. Flex-gear electrical power transmission

    NASA Technical Reports Server (NTRS)

    Vranish, John; Peritt, Jonathan

    1993-01-01

    This study was conducted to develop an alternative way of transferring electricity across a continuously rotating joint, with little wear and the potential for low electrical noise. The problems with wires, slip rings, electromagnetic couplings, and recently invented roll-rings are discussed. Flex-gears, an improvement of roll-rings, are described. An entire class of flexgear devices is developed. Finally, the preferred flex-gear device is optimized for maximum electrical contact and analyzed for average mechanical power loss and maximum stress. For a device diameter of six inches, the preferred device is predicted to have a total electrical contact area of 0.066 square inches. In the preferred device, a small amount of internal sliding produces a 0.003 inch-pound torque that resists the motion of the device.

  14. Simulating economic effects of disruptions in the telecommunications infrastructure.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cox, Roger Gary; Barton, Dianne Catherine; Reinert, Rhonda K.

    2004-01-01

    CommAspen is a new agent-based model for simulating the interdependent effects of market decisions and disruptions in the telecommunications infrastructure on other critical infrastructures in the U.S. economy such as banking and finance, and electric power. CommAspen extends and modifies the capabilities of Aspen-EE, an agent-based model previously developed by Sandia National Laboratories to analyze the interdependencies between the electric power system and other critical infrastructures. CommAspen has been tested on a series of scenarios in which the communications network has been disrupted, due to congestion and outages. Analysis of the scenario results indicates that communications networks simulated by themore » model behave as their counterparts do in the real world. Results also show that the model could be used to analyze the economic impact of communications congestion and outages.« less

  15. Weather applications and products enabled through vehicle infrastructure integration (VII) : feasibility and concept development study

    DOT National Transportation Integrated Search

    2007-01-01

    Vehicle Infrastructure Integration (VII) involves the two-way wireless transmission of data from vehicle-to-vehicle and vehicle-to-infrastructure utilizing Dedicated Short Range Communications (DSRC). VII will enable the development of weather-relate...

  16. Small passenger car transmission test: Dodge Omni A-404 transmission

    NASA Technical Reports Server (NTRS)

    Bujold, M. P.

    1980-01-01

    The small passenger car transmission test was initiated to supply electric vehicle manufacturers with technical information regarding the performance of commercially available transmissions. This transmission was tested in accordance with a passenger car automatic transmission test code (SAE J65lb) which required drive performance, coast performance, and no load test conditions. Under these test conditions, the transmission attained maximum efficiencies in the mid eighty percent range for both drive performance test and coast performance tests.

  17. The effect of the NERC CIP standards on the reliability of the North American Bulk Electric System

    DOE PAGES

    Ladendorff, Marlene Z.

    2016-06-01

    Considerable money and effort has been expended by generation, transmission, and distribution entities in North America to implement the North American Electric Reliability Corporation (NERC) Critical Infrastructure Protection (CIP) standards for the bulk electric system. Assumptions have been made that as a result of the implementation of the standards, the grid is more cyber secure than it was pre-NERC CIP, but are there data supporting these claims, or only speculation? Has the implementation of the standards had an effect on the grid? Furthermore, developing a research study to address these and other questions provided surprising results.

  18. Area-Specific Marginal Costing for Electric Utilities: a Case Study of Transmission and Distribution Costs

    NASA Astrophysics Data System (ADS)

    Orans, Ren

    1990-10-01

    Existing procedures used to develop marginal costs for electric utilities were not designed for applications in an increasingly competitive market for electric power. The utility's value of receiving power, or the costs of selling power, however, depend on the exact location of the buyer or seller, the magnitude of the power and the period of time over which the power is used. Yet no electric utility in the United States has disaggregate marginal costs that reflect differences in costs due to the time, size or location of the load associated with their power or energy transactions. The existing marginal costing methods used by electric utilities were developed in response to the Public Utilities Regulatory Policy Act (PURPA) in 1978. The "ratemaking standards" (Title 1) established by PURPA were primarily concerned with the appropriate segmentation of total revenues to various classes-of-service, designing time-of-use rating periods, and the promotion of efficient long-term resource planning. By design, the methods were very simple and inexpensive to implement. Now, more than a decade later, the costing issues facing electric utilities are becoming increasingly complex, and the benefits of developing more specific marginal costs will outweigh the costs of developing this information in many cases. This research develops a framework for estimating total marginal costs that vary by the size, timing, and the location of changes in loads within an electric distribution system. To complement the existing work at the Electric Power Research Institute (EPRI) and Pacific Gas and Electric Company (PGandE) on estimating disaggregate generation and transmission capacity costs, this dissertation focuses on the estimation of distribution capacity costs. While the costing procedure is suitable for the estimation of total (generation, transmission and distribution) marginal costs, the empirical work focuses on the geographic disaggregation of marginal costs related to electric

  19. Electrical properties of purinergic transmission in smooth muscle of the guinea-pig prostate.

    PubMed

    Lam, Michelle; Mitsui, Retsu; Hashitani, Hikaru

    2016-01-01

    Prostatic smooth muscle develops spontaneous myogenic tone which is modulated by autonomic neuromuscular transmission. This study aimed to investigate the role of purinergic transmission in regulating electrical activity of prostate smooth muscle and whether its contribution may be altered with age. Intracellular recordings were simultaneously made with isometric tension recordings in smooth muscle preparations of the guinea-pig prostate. Immunostaining for P2X1 receptors on whole mount preparations was also performed. In prostate preparations which generated spontaneous slow waves, electrical field stimulation (EFS)-evoked excitatory junction potentials (EJPs) which were abolished by guanethidine (10 μM), α-β-methylene ATP (10 μM) or pyridoxal phosphate-6-azophenyl-2,4-disulfonic acid (PPADS, 10 μM) but not phentolamine (1 μM). Consistently, immunostaining revealed the expression of P2X1 receptors on prostatic smooth muscle. EJPs themselves did not cause contractions, but EJPs could sum to trigger a slow wave and associated contraction. Yohimbine (1 μM) and 3,7-dimethyl-1-propargylxanthine (DMPX, 10 μM) but not propranolol (1 μM) potentiated EJPs. Although properties of EJPs were not different between young and aging guinea-pig prostates, ectoATPase inhibitor ARL 67156 (100 μM) augmented EJP amplitudes by 64.2 ± 29.6% in aging animals, compared to 22.1 ± 19.9% in young animals. These results suggest that ATP released from sympathetic nerves acts on P2X1 purinoceptors located on prostate smooth muscle to evoke EJPs, while pre-junctional α2-adrenergic and adenosine A2 receptors may play a role in preventing excessive transmitter release. Age-related up-regulation of enzymatic ATP breakdown may be a compensatory mechanism for the enhanced purinergic transmission which would cause hypercontractility arising from increased ATP release in older animals. Copyright © 2015 Elsevier B.V. All rights reserved.

  20. Investing in Alternative Fuel Infrastructure: Insights for California from Stakeholder Interviews: Preprint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Melaina, Marc; Muratori, Matteo; McLaren, Joyce

    Increased interest in the use of alternative transportation fuels, such as natural gas, hydrogen, and electricity, is being driven by heightened concern about the climate impacts of gasoline and diesel emissions and our dependence on finite oil resources. A key barrier to widespread adoption of low- and zero-emission passenger vehicles is the availability of refueling infrastructure. Recalling the 'chicken and egg' conundrum, limited adoption of alternative fuel vehicles increases the perceived risk of investments in refueling infrastructure, while lack of refueling infrastructure inhibits vehicle adoption. In this paper, we present the results of a study of the perceived risks andmore » barriers to investment in alternative fuels infrastructure, based on interviews with industry experts and stakeholders. We cover barriers to infrastructure development for three alternative fuels for passenger vehicles: compressed natural gas, hydrogen, and electricity. As an early-mover in zero emission passenger vehicles, California provides the early market experience necessary to map the alternative fuel infrastructure business space. Results and insights identified in this study can be used to inform investment decisions, formulate incentive programs, and guide deployment plans for alternative fueling infrastructure in the U.S. and elsewhere.« less

  1. Shifting and power sharing control of a novel dual input clutchless transmission for electric vehicles

    NASA Astrophysics Data System (ADS)

    Liang, Jiejunyi; Yang, Haitao; Wu, Jinglai; Zhang, Nong; Walker, Paul D.

    2018-05-01

    To improve the overall efficiency of electric vehicles and guarantee the driving comfort and vehicle drivability under the concept of simplifying mechanism complexity and minimizing manufacturing cost, this paper proposes a novel clutchless power-shifting transmission system with shifting control strategy and power sharing control strategy. The proposed shifting strategy takes advantage of the transmission architecture to achieve power-on shifting, which greatly improves the driving comfort compared with conventional automated manual transmission, with a bump function based shifting control method. To maximize the overall efficiency, a real-time power sharing control strategy is designed to solve the power distribution problem between the two motors. Detailed mathematical model is built to verify the effectiveness of the proposed methods. The results demonstrate the proposed strategies considerably improve the overall efficiency while achieve non-interrupted power-on shifting and maintain the vehicle jerk during shifting under an acceptable threshold.

  2. Managing Critical Infrastructures C.I.M. Suite

    ScienceCinema

    Dudenhoeffer, Donald

    2018-05-23

    See how a new software package developed by INL researchers could help protect infrastructure during natural disasters, terrorist attacks and electrical outages. For more information about INL research, visit http://www.facebook.com/idahonationallaboratory.

  3. Evaluating the Benefits of Adaptation of Critical Infrastructures to Hydrometeorological Risks.

    PubMed

    Thacker, Scott; Kelly, Scott; Pant, Raghav; Hall, Jim W

    2018-01-01

    Infrastructure adaptation measures provide a practical way to reduce the risk from extreme hydrometeorological hazards, such as floods and windstorms. The benefit of adapting infrastructure assets is evaluated as the reduction in risk relative to the "do nothing" case. However, evaluating the full benefits of risk reduction is challenging because of the complexity of the systems, the scarcity of data, and the uncertainty of future climatic changes. We address this challenge by integrating methods from the study of climate adaptation, infrastructure systems, and complex networks. In doing so, we outline an infrastructure risk assessment that incorporates interdependence, user demands, and potential failure-related economic losses. Individual infrastructure assets are intersected with probabilistic hazard maps to calculate expected annual damages. Protection measure costs are integrated to calculate risk reduction and associated discounted benefits, which are used to explore the business case for investment in adaptation. A demonstration of the methodology is provided for flood protection of major electricity substations in England and Wales. We conclude that the ongoing adaptation program for major electricity assets is highly cost beneficial. © 2017 Society for Risk Analysis.

  4. New EVSE Analytical Tools/Models: Electric Vehicle Infrastructure Projection Tool (EVI-Pro)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wood, Eric W; Rames, Clement L; Muratori, Matteo

    This presentation addresses the fundamental question of how much charging infrastructure is needed in the United States to support PEVs. It complements ongoing EVSE initiatives by providing a comprehensive analysis of national PEV charging infrastructure requirements. The result is a quantitative estimate for a U.S. network of non-residential (public and workplace) EVSE that would be needed to support broader PEV adoption. The analysis provides guidance to public and private stakeholders who are seeking to provide nationwide charging coverage, improve the EVSE business case by maximizing station utilization, and promote effective use of private/public infrastructure investments.

  5. Electrical resistivity imaging in transmission between surface and underground tunnel for fault characterization

    NASA Astrophysics Data System (ADS)

    Lesparre, N.; Boyle, A.; Grychtol, B.; Cabrera, J.; Marteau, J.; Adler, A.

    2016-05-01

    Electrical resistivity images supply information on sub-surface structures and are classically performed to characterize faults geometry. Here we use the presence of a tunnel intersecting a regional fault to inject electrical currents between surface and the tunnel to improve the image resolution at depth. We apply an original methodology for defining the inversion parametrization based on pilot points to better deal with the heterogeneous sounding of the medium. An increased region of high spatial resolution is shown by analysis of point spread functions as well as inversion of synthetics. Such evaluations highlight the advantages of using transmission measurements by transferring a few electrodes from the main profile to increase the sounding depth. Based on the resulting image we propose a revised structure for the medium surrounding the Cernon fault supported by geological observations and muon flux measurements.

  6. Power transmission cable development for the Space Station Freedom electrical power system

    NASA Technical Reports Server (NTRS)

    Schmitz, Gregory V.; Biess, John J.

    1989-01-01

    Power transmission cable is presently being evaluated under a NASA Lewis Research Center advanced development contract for application in the Space Station Freedom (SSF) electrical power system (EPS). Evaluation testing has been performed by TRW and NASA Lewis Research Center. The results of this development contract are presented. The primary cable design goals are to provide (1) a low characteristic inductance to minimize line voltage drop at 20 kHz, (2) electromagnetic compatibility control of the 20-kHz ac power current, (3) a physical configuration that minimizes ac resistance and (4) release of trapped air for corona-free operation.

  7. Enabling fast charging – Infrastructure and economic considerations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burnham, Andrew; Dufek, Eric J.; Stephens, Thomas

    The ability to charge battery electric vehicles (BEVs) on a time scale that is on par with the time to fuel an internal combustion engine vehicle (ICEV) would remove a significant barrier to the adoption of BEVs. However, for viability, fast charging at this time scale needs to also occur at a price that is acceptable to consumers. Therefore, the cost drivers for both BEV owners and charging station providers are analyzed. In addition, key infrastructure considerations are examined, including grid stability and delivery of power, the design of fast charging stations and the design and use of electric vehiclemore » service equipment. Each of these aspects have technical barriers that need to be addressed, and are directly linked to economic impacts to use and implementation. This discussion focuses on both the economic and infrastructure issues which exist and need to be addressed for the effective implementation of fast charging at 400 kW and above. In so doing, it has been found that there is a distinct need to effectively manage the intermittent, high power demand of fast charging, strategically plan infrastructure corridors, and to further understand the cost of operation of charging infrastructure and BEVs.« less

  8. Enabling fast charging – Infrastructure and economic considerations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burnham, Andrew; Dufek, Eric J.; Stephens, Thomas

    The ability to charge battery electric vehicles (BEVs) on a time scale that is on par with the time to fuel an internal combustion engine vehicle (ICEV) would remove a significant barrier to the adoption of BEVs. However, for viability, fast charging at this time scale needs to also occur at a price that is acceptable to consumers. Therefore, the cost drivers for both BEV owners and charging station providers are analyzed. In addition, key infrastructure considerations are examined, including grid stability and delivery of power, the design of fast charging stations and the design and use of electric vehiclemore » service equipment. Each of these aspects have technical barriers that need to be addressed, and are directly linked to economic impacts to use and implementation. Here, this discussion focuses on both the economic and infrastructure issues which exist and need to be addressed for the effective implementation of fast charging up to 350 kW. In doing so, it has been found that there is a distinct need to effectively manage the intermittent, high power demand of fast charging, strategically plan infrastructure corridors, and to further understand the cost of operation of charging infrastructure and BEVs.« less

  9. Enabling fast charging – Infrastructure and economic considerations

    DOE PAGES

    Burnham, Andrew; Dufek, Eric J.; Stephens, Thomas; ...

    2017-10-23

    The ability to charge battery electric vehicles (BEVs) on a time scale that is on par with the time to fuel an internal combustion engine vehicle (ICEV) would remove a significant barrier to the adoption of BEVs. However, for viability, fast charging at this time scale needs to also occur at a price that is acceptable to consumers. Therefore, the cost drivers for both BEV owners and charging station providers are analyzed. In addition, key infrastructure considerations are examined, including grid stability and delivery of power, the design of fast charging stations and the design and use of electric vehiclemore » service equipment. Each of these aspects have technical barriers that need to be addressed, and are directly linked to economic impacts to use and implementation. Here, this discussion focuses on both the economic and infrastructure issues which exist and need to be addressed for the effective implementation of fast charging up to 350 kW. In doing so, it has been found that there is a distinct need to effectively manage the intermittent, high power demand of fast charging, strategically plan infrastructure corridors, and to further understand the cost of operation of charging infrastructure and BEVs.« less

  10. Small passenger car transmission test-Chevrolet 200 transmission

    NASA Technical Reports Server (NTRS)

    Bujold, M. P.

    1980-01-01

    The small passenger car transmission was tested to supply electric vehicle manufacturers with technical information regarding the performance of commerically available transmissions which would enable them to design a more energy efficient vehicle. With this information the manufacturers could estimate vehicle driving range as well as speed and torque requirements for specific road load performance characteristics. A 1979 Chevrolet Model 200 automatic transmission was tested per a passenger car automatic transmission test code (SAE J651b) which required drive performance, coast performance, and no load test conditions. The transmission attained maximum efficiencies in the mid-eighty percent range for both drive performance tests and coast performance tests. Torque, speed and efficiency curves map the complete performance characteristics for Chevrolet Model 200 transmission.

  11. How Critical Is Critical Infrastructure?

    DTIC Science & Technology

    2015-09-01

    electrical power, telecommunications, transportation, petroleum liquid , or natural gas as shown in Figure 34 from the National Infrastructure Protection...Natural Gas Segment  Food and Agriculture Sector  Government facilities Sector  Healthcare and Public Health Sector  Information Technology...514 religious meeting places, 127 gas 69 “Current United States GDP,” 2015, http

  12. 1KW Power Transmission Using Wireless Acoustic-Electric Feed-Through (WAEF)

    NASA Technical Reports Server (NTRS)

    Sherrit, S.; Bao, X.; Badescu, M.; Aldrich, J.; Bar-Cohen, Y.; Biederman, W.

    2008-01-01

    A variety of space applications require the delivery of power into sealed structures. Since the structural integrity can be degraded by holes for cabling we present an alternative method of delivering power and information using stress waves to the internal space of a sealed structure. One particular application of this technology is in sample return missions where it is critical to preserve the sample integrity and to prevent earth contamination. Therefore, the container has to be hermetically sealed and the integrity of the seal must be monitored in order to insure to a high degree of reliability the integrity of the sample return vessel. In this study we investigated the use of piezoelectric acoustic-electric power feed-through devices to transfer electric power wirelessly through a solid wall by using elastic or acoustic waves. The technology is applicable to a range of space and terrestrial applications where power is required by electronic equipment inside sealed containers, vacuum or pressure vessels, etc., where holes in the wall are prohibitive or may result in significant structural performance degradation or unnecessarily complex designs. To meet requirements of higher power applications, the feasibility to transfer kilowatts level power was investigated. Pre-stressed longitudinal piezoelectric feed-through devices were analyzed by finite element models and an equivalent circuit model was developed to predict the power transfer characteristics to different electric loads. Based on the results of the analysis a prototype device was designed, fabricated and a demonstration of the transmission of electric power up to 1.068-kW was successfully conducted. Efficiencies in the 80-90% range were also demonstrated and methods to increase the efficiency further are currently being considered.

  13. Co-Optimization of Electricity Transmission and Generation Resources for Planning and Policy Analysis: Review of Concepts and Modeling Approaches

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Krishnan, Venkat; Ho, Jonathan; Hobbs, Benjamin F.

    2016-05-01

    The recognition of transmission's interaction with other resources has motivated the development of co-optimization methods to optimize transmission investment while simultaneously considering tradeoffs with investments in electricity supply, demand, and storage resources. For a given set of constraints, co-optimized planning models provide solutions that have lower costs than solutions obtained from decoupled optimization (transmission-only, generation-only, or iterations between them). This paper describes co-optimization and provides an overview of approaches to co-optimizing transmission options, supply-side resources, demand-side resources, and natural gas pipelines. In particular, the paper provides an up-to-date assessment of the present and potential capabilities of existing co-optimization tools, andmore » it discusses needs and challenges for developing advanced co-optimization models.« less

  14. Modeling Geoelectric Fields and Geomagnetically Induced Currents Around New Zealand to Explore GIC in the South Island's Electrical Transmission Network

    NASA Astrophysics Data System (ADS)

    Divett, T.; Ingham, M.; Beggan, C. D.; Richardson, G. S.; Rodger, C. J.; Thomson, A. W. P.; Dalzell, M.

    2017-10-01

    Transformers in New Zealand's South Island electrical transmission network have been impacted by geomagnetically induced currents (GIC) during geomagnetic storms. We explore the impact of GIC on this network by developing a thin-sheet conductance (TSC) model for the region, a geoelectric field model, and a GIC network model. (The TSC is composed of a thin-sheet conductance map with underlying layered resistivity structure.) Using modeling approaches that have been successfully used in the United Kingdom and Ireland, we applied a thin-sheet model to calculate the electric field as a function of magnetic field and ground conductance. We developed a TSC model based on magnetotelluric surveys, geology, and bathymetry, modified to account for offshore sediments. Using this representation, the thin sheet model gave good agreement with measured impedance vectors. Driven by a spatially uniform magnetic field variation, the thin-sheet model results in electric fields dominated by the ocean-land boundary with effects due to the deep ocean and steep terrain. There is a strong tendency for the electric field to align northwest-southeast, irrespective of the direction of the magnetic field. Applying this electric field to a GIC network model, we show that modeled GIC are dominated by northwest-southeast transmission lines rather than east-west lines usually assumed to dominate.

  15. Least cost pathways to a low carbon electricity system for Australia: impacts of transmission augmentation and extension

    NASA Astrophysics Data System (ADS)

    Dargaville, R. J.

    2016-12-01

    Designing the pathway to a low carbon energy system is complex, requiring consideration of the variable nature of renewables at the hourly timescale, emission intensity and ramp rate constraints of dispatchable technologies (both fossil and renewable) and transmission and distribution network limitations. In this work, an optimization framework taking into account these considerations has been applied to find the lowest cost ways to reduce carbon emissions by either 80% or 100% in 2050 while keeping the system operating reliably along the way. Technologies included are existing and advanced coal and gas technologies (with and without carbon capture and storage), rooftop PV, utility scale PV, concentrating solar thermal, hydro with and without pumped storage, bioenergy, and nuclear. In this study we also also the optimisation to increase transmission capacity along existing lines, and to extend key trunk lines into currently unserved areas. These augementations and extensions come at a cost. The otpimisation chooses these options when the benefits of accessing high quality renewable energy resources outweights the costs. Results show that for the 80% emission reduction case, there is limited need for transmission capacity increase, and that the existing grid copes well with the increased flows due to conversion to distrubuted renewable energy resources. However, in the 100% case the increased reliance on renewables means that signficant transmission augmentation is beneficial to the overall cost. This strongly suggests that it is important to understand the long term emission target early so that infrastructure investments can be optimised.

  16. Acoustic energy transmission in cast iron pipelines

    NASA Astrophysics Data System (ADS)

    Kiziroglou, Michail E.; Boyle, David E.; Wright, Steven W.; Yeatman, Eric M.

    2015-12-01

    In this paper we propose acoustic power transfer as a method for the remote powering of pipeline sensor nodes. A theoretical framework of acoustic power propagation in the ceramic transducers and the metal structures is drawn, based on the Mason equivalent circuit. The effect of mounting on the electrical response of piezoelectric transducers is studied experimentally. Using two identical transducer structures, power transmission of 0.33 mW through a 1 m long, 118 mm diameter cast iron pipe, with 8 mm wall thickness is demonstrated, at 1 V received voltage amplitude. A near-linear relationship between input and output voltage is observed. These results show that it is possible to deliver significant power to sensor nodes through acoustic waves in solid structures. The proposed method may enable the implementation of acoustic - powered wireless sensor nodes for structural and operation monitoring of pipeline infrastructure.

  17. Impact of impedance unbalance on the efficiency of electricity transmission and distribution - A case study

    NASA Astrophysics Data System (ADS)

    Pavlov, L'uboš; Skurčák, L'uboš; Chovanec, Juraj; Altus, Juraj

    2017-11-01

    This article is devoted to the analysis of the possible influence of impedance asymmetry on the efficiency of electricity transmission and distribution in the electricity system in Slovakia, at a voltage level of 110 kV - 400 kV, using synchronic phasor monitoring results. For simplicity of calculations, in practice, the impedance imbalance from mutual interfacial inductive capacitances bonds is neglected. In this way, the 3-phase network is interpreted as symmetrical in the calculations. In this case, it is possible to determine only some components of losses (ohmic losses, corona loss, leakages, etc). The influence of impedance asymmetry can be quantified by calculation using the results of the monitoring of the synchronous phasors of selected electricity system elements (OHL, transformer, choke) or by 3-phase modelling of real system elements. frequency to test the transformer for induced over voltage test, and its characteristics is analysed.

  18. A Historical and Engineering View of Power Transmission Systems in Kansai Electric Power Co., Inc.

    NASA Astrophysics Data System (ADS)

    Ito, Shunichi; Akiyama, Tetsuo

    During our work in operations related to power transmission technology, we have encountered various natural calamities and man-made disasters. Over the years, we learned many valuable lessons from these bitter experiences, and we now have more reliable, cost-effective and flexible electric power systems. This paper describes the new technologies we have introduced in the facilities making up the power systems and how we operate these systems and facilities. It also takes up the Southern Hyogo Earthquake and loss of Ohi nuclear power generation due to galloping phenomena as typical examples showing how a set of measures as mentioned above substantially improved the reliability of the electric power systems to such an extent that the Japanese electric power systems have attained the world's highest level of reliability. These facts prove that steady and continuous efforts are a prerequisite to success for all power engineers.

  19. Low frequency electric field variations during HF transmissions on a mother-daughter rocket

    NASA Technical Reports Server (NTRS)

    Rosenberg, T. J.; Maynard, M. C.; Holtet, J. A.; Karlsen, N. O.; Egeland, A.; Moe, T. E.; Troim, J.

    1977-01-01

    HF wave propagation experiments were conducted on Mother-Daughter rockets in the polar ionosphere. Swept frequency transmissions from the Mother, nominally covering the range from 0.5 to 5 MHz in both CW and pulse modes, are received by the Daughter. In the most recent rocket of the series, the Mother also contained an AC electric field spectrometer covering the frequency range from 10 Hz to 100 kHz in four decade bands. The low frequency response of the ionosphere with respect to waves emitted from the onboard HF transmitter is examined.

  20. Fault detection and classification in electrical power transmission system using artificial neural network.

    PubMed

    Jamil, Majid; Sharma, Sanjeev Kumar; Singh, Rajveer

    2015-01-01

    This paper focuses on the detection and classification of the faults on electrical power transmission line using artificial neural networks. The three phase currents and voltages of one end are taken as inputs in the proposed scheme. The feed forward neural network along with back propagation algorithm has been employed for detection and classification of the fault for analysis of each of the three phases involved in the process. A detailed analysis with varying number of hidden layers has been performed to validate the choice of the neural network. The simulation results concluded that the present method based on the neural network is efficient in detecting and classifying the faults on transmission lines with satisfactory performances. The different faults are simulated with different parameters to check the versatility of the method. The proposed method can be extended to the Distribution network of the Power System. The various simulations and analysis of signals is done in the MATLAB(®) environment.

  1. Hydraulic system for a ratio change transmission

    DOEpatents

    Kalns, Ilmars

    1981-01-01

    Disclosed is a drive assembly (10) for an electrically powered vehicle (12). The assembly includes a transaxle (16) having a two-speed transmission (40) and a drive axle differential (46) disposed in a unitary housing assembly (38), an oil-cooled prime mover or electric motor (14) for driving the transmission input shaft (42), an adapter assembly (24) for supporting the prime mover on the transaxle housing assembly, and a hydraulic system (172) providing pressurized oil flow for cooling and lubricating the electric motor and transaxle and for operating a clutch (84) and a brake (86) in the transmission to shift between the two-speed ratios of the transmission. The adapter assembly allows the prime mover to be supported in several positions on the transaxle housing. The brake is spring-applied and locks the transmission in its low-speed ratio should the hydraulic system fail. The hydraulic system pump is driven by an electric motor (212) independent of the prime mover and transaxle.

  2. Transmission of electric fields due to distributed cloud charges in the atmosphere-ionosphere system

    NASA Astrophysics Data System (ADS)

    Paul, Suman; De, S. S.; Haldar, D. K.; Guha, G.

    2017-10-01

    The transmission of electric fields in the lower atmosphere by thunder clouds with a suitable charge distribution profile has been modeled. The electromagnetic responses of the atmosphere are presented through Maxwell's equations together with a time-varying source charge distribution. The conductivities are taken to be exponentially graded function of altitude. The radial and vertical electric field components are derived for isotropic, anisotropic and thundercloud regions. The analytical solutions for the total Maxwell's current which flows from the cloud into the ionosphere under DC and quasi-static conditions are obtained for isotropic region. We found that the effect of charge distribution in thunderclouds produced by lightning discharges diminishes rapidly with increasing altitudes. Also, it is found that time to reach Maxwell's currents a maximum is higher for higher altitudes.

  3. Final Report Navajo Transmission Project (NTP)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bennie Hoisington; Steven Begay

    2006-09-14

    The Diné Power Authority is developing the Navajo Transmission Project (NTP) to relieve the constraints on the transmission of electricity west of the Four Corners area and to improve the operation flexibility and reliability of the extra-high-voltage transmission system in the region. The NTP creates the wholesale transmission capacity for more economical power transfers, sales, and purchases in the region. It will facilitate the development of Navajo energy resources, improve economic conditions on the Navajo Nation as well as allow DPA to participate in the western electrical utility industry.

  4. Transmission of 51.56-Gb/s OOK signal using 1.55-μm directly modulated laser and duobinary electrical equalizer.

    PubMed

    Bae, S H; Kim, Hoon; Chung, Y C

    2016-10-03

    We demonstrate the transmission of 51.56-Gb/s on-off keying (OOK) signals generated by using a 1.55-μm directly modulated laser (DML) over 15-km long standard single-mode fiber. In this experiment, a duobinary electrical equalizer based on a finite-impulse-response filter is used at the receiver to increase the dispersion-limited transmission distance. We evaluate the performances of the 51.56-Gb/s OOK signals with respect to the transmission distance by using the frequency response analysis of the proposed system. This result is used to explain why it is effective to utilize the duobinary equalization (instead of binary equalization) for increasing the transmission distance.

  5. Essays on Infrastructure Design and Planning for Clean Energy Systems

    NASA Astrophysics Data System (ADS)

    Kocaman, Ayse Selin

    The International Energy Agency estimates that the number of people who do not have access to electricity is nearly 1.3 billion and a billion more have only unreliable and intermittent supply. Moreover, current supply for electricity generation mostly relies on fossil fuels, which are finite and one of the greatest threats to the environment. Rising population growth rates, depleting fuel sources, environmental issues and economic developments have increased the need for mathematical optimization to provide a formal framework that enables systematic and clear decision-making in energy operations. This thesis through its methodologies and algorithms enable tools for energy generation, transmission and distribution system design and help policy makers make cost assessments in energy infrastructure planning rapidly and accurately. In Chapter 2, we focus on local-level power distribution systems planning for rural electrification using techniques from combinatorial optimization. We describe a heuristic algorithm that provides a quick solution for the partial electrification problem where the distribution network can only connect a pre-specified number of households with low voltage lines. The algorithm demonstrates the effect of household settlement patterns on the electrification cost. We also describe the first heuristic algorithm that selects the locations and service areas of transformers without requiring candidate solutions and simultaneously builds a two-level grid network in a green-field setting. The algorithms are applied to real world rural settings in Africa, where household locations digitized from satellite imagery are prescribed. In Chapter 3 and 4, we focus on power generation and transmission using clean energy sources. Here, we imagine a country in the future where hydro and solar are the dominant sources and fossil fuels are only available in minimal form. We discuss the problem of modeling hydro and solar energy production and allocation, including

  6. Transmission congestion management in the electricity market

    NASA Astrophysics Data System (ADS)

    Chen, Yue

    2018-04-01

    In this paper we mainly discuss how to optimize the arrangement to decrease the loss of each line when the power generation side of the system transmission congestion occurs in a safe and economical manner. We respectively set the adjust model if the transmission can be eliminated which can calculate the best scheme and safety margin model when transmission cannot be eliminated which is a multi-objective planning problem. We solve the two models on the condition of the load power demands are 982.4MW and 1052.8 MW by Lingo and get the optimal management scheme.

  7. Electric urban delivery trucks: energy use, greenhouse gas emissions, and cost-effectiveness.

    PubMed

    Lee, Dong-Yeon; Thomas, Valerie M; Brown, Marilyn A

    2013-07-16

    We compare electric and diesel urban delivery trucks in terms of life-cycle energy consumption, greenhouse gas (GHG) emissions, and total cost of ownership (TCO). The relative benefits of electric trucks depend heavily on vehicle efficiency associated with drive cycle, diesel fuel price, travel demand, electric drive battery replacement and price, electricity generation and transmission efficiency, electric truck recharging infrastructure, and purchase price. For a drive cycle with frequent stops and low average speed such as the New York City Cycle (NYCC), electric trucks emit 42-61% less GHGs and consume 32-54% less energy than diesel trucks, depending upon vehicle efficiency cases. Over an array of possible conditions, the median TCO of electric trucks is 22% less than that of diesel trucks on the NYCC. For a drive cycle with less frequent stops and high average speed such as the City-Suburban Heavy Vehicle Cycle (CSHVC), electric trucks emit 19-43% less GHGs and consume 5-34% less energy, but cost 1% more than diesel counterparts. Considering current and projected U.S. regional electricity generation mixes, for the baseline case, the energy use and GHG emissions ratios of electric to diesel trucks range from 48 to 82% and 25 to 89%, respectively.

  8. Renewable Energy Zone (REZ) Transmission Planning Process

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lee, Nathan

    A REZ is a geographical area that enables the development of profitable, cost-effective, grid-connected renewable energy (RE). The REZ Transmission Planning Process is a proactive approach to plan, approve, and build transmission infrastructure connecting REZs to the power system which helps to increase the share of solar, wind and other RE resources in the power system while maintaining reliability and economics, and focuses on large-scale wind and solar resources that can be developed in sufficient quantities to warrant transmission system expansion and upgrades.

  9. Three essays on "making" electric power markets

    NASA Astrophysics Data System (ADS)

    Kench, Brian Thomas

    2000-10-01

    Technological change over the past three decades has altered most of the basic conditions in the electric power industry. Because of technical progress, the dominant paradigm has shifted from the provision of electric power by regulated and vertically integrated local natural monopolies to competition and vertical separation. In the first essay I provide a historical context of the electric industry's power current deregulation debate. Then a dynamic model of induced institutional change is used to investigate how endogenous technological advancements have induced radical institutional change in the generation and transmission segments of the electric power industry. Because the Federal Energy Regulatory Commission (FERC) ordered regulated utilities to provide open access to their transmission networks and to separate their generation and transmission functions, transmission networks have been used more intensively and in much different ways then in the past. The second essay tests experimentally the predictions of neoclassical theory for a radial electric power market under two alternative deregulated transmission institutions: financial transmission rights and physical transmission rights. Experimental evidence presented there demonstrates that an electric power market with physical transmission rights governing its transmission network generates more "right" market signals relative to a transmission network governed by financial transmission rights. The move to a greater reliance on markets for electric power is an idea that has animated sweeping and dramatic changes in the traditional business of electric power. The third essay examines two of the most innovative and complex initiatives of making electric power markets in the United States: California and PJM. As those markets mature and others are made, they must revise their governance mechanisms to eliminate rules that create inefficiency and adopt rules that work efficiently elsewhere. I argue that

  10. Calculation of voltages in electric power transmission lines during historic geomagnetic storms: An investigation using realistic earth impedances

    USGS Publications Warehouse

    Lucas, Greg M.; Love, Jeffrey J.; Kelbert, Anna

    2018-01-01

    Commonly, one-dimensional (1-D) Earth impedances have been used to calculate the voltages induced across electric power transmission lines during geomagnetic storms under the assumption that much of the three-dimensional structure of the Earth gets smoothed when integrating along power transmission lines. We calculate the voltage across power transmission lines in the mid-Atlantic region with both regional 1-D impedances and 64 empirical 3-D impedances obtained from a magnetotelluric survey. The use of 3-D impedances produces substantially more spatial variance in the calculated voltages, with the voltages being more than an order of magnitude different, both higher and lower, than the voltages calculated utilizing regional 1-D impedances. During the March 1989 geomagnetic storm 62 transmission lines exceed 100 V when utilizing empirical 3-D impedances, whereas 16 transmission lines exceed 100 V when utilizing regional 1-D impedances. This demonstrates the importance of using realistic impedances to understand and quantify the impact that a geomagnetic storm has on power grids.

  11. Transmission probabilities of rarefied flows in the application of atmosphere-breathing electric propulsion

    NASA Astrophysics Data System (ADS)

    Binder, T.; Boldini, P. C.; Romano, F.; Herdrich, G.; Fasoulas, S.

    2016-11-01

    Atmosphere-Breathing Electric Propulsion systems (ABEP) are currently investigated to utilize the residual atmosphere as propellant for drag-compensating thrusters on spacecraft in (very) low orbits. The key concept for an efficient intake of such a system is to feed a large fraction of the incoming flow to the thruster by a high transmission probability Θ for the inflow while Θ for the backflow should be as low as possible. This is the case for rarefied flows through tube-like structures of arbitrary cross section when assuming diffuse wall reflections inside and after these ducts, and entrance velocities u larger than thermal velocities vt h∝√{kBT /m } . The theory of transmission for free molecular flow through cylinders is well known for u = 0, but less research results are available for u > 0. In this paper, the desired theoretical characteristics of intakes for ABEP are pointed out, a short review of transmission probabilities is given, and results of Monte Carlo simulations concerning Θ are presented. Based on simple algebraic relations, an intake can be optimized in terms of collection efficiency by choosing optimal ducts. It is shown that Θ depends only on non-dimensional values of the duct geometry combined with vth and u. The simulation results of a complete exemplary ABEP configuration illustrate the influence of modeling quality in terms of inflow conditions and inter-particle collisions.

  12. Essays on pricing electricity and electricity derivatives in deregulated markets

    NASA Astrophysics Data System (ADS)

    Popova, Julia

    2008-10-01

    This dissertation is composed of four essays on the behavior of wholesale electricity prices and their derivatives. The first essay provides an empirical model that takes into account the spatial features of a transmission network on the electricity market. The spatial structure of the transmission grid plays a key role in determining electricity prices, but it has not been incorporated into previous empirical models. The econometric model in this essay incorporates a simple representation of the transmission system into a spatial panel data model of electricity prices, and also accounts for the effect of dynamic transmission system constraints on electricity market integration. Empirical results using PJM data confirm the existence of spatial patterns in electricity prices and show that spatial correlation diminishes as transmission lines become more congested. The second essay develops and empirically tests a model of the influence of natural gas storage inventories on the electricity forward premium. I link a model of the effect of gas storage constraints on the higher moments of the distribution of electricity prices to a model of the effect of those moments on the forward premium. Empirical results using PJM data support the model's predictions that gas storage inventories sharply reduce the electricity forward premium when demand for electricity is high and space-heating demand for gas is low. The third essay examines the efficiency of PJM electricity markets. A market is efficient if prices reflect all relevant information, so that prices follow a random walk. The hypothesis of random walk is examined using empirical tests, including the Portmanteau, Augmented Dickey-Fuller, KPSS, and multiple variance ratio tests. The results are mixed though evidence of some level of market efficiency is found. The last essay investigates the possibility that previous researchers have drawn spurious conclusions based on classical unit root tests incorrectly applied to

  13. Positioning infrastructure and technologies for low-carbon urbanization

    NASA Astrophysics Data System (ADS)

    Chester, Mikhail V.; Sperling, Josh; Stokes, Eleanor; Allenby, Braden; Kockelman, Kara; Kennedy, Christopher; Baker, Lawrence A.; Keirstead, James; Hendrickson, Chris T.

    2014-10-01

    The expected urbanization of the planet in the coming century coupled with aging infrastructure in developed regions, increasing complexity of man-made systems, and pressing climate change impacts have created opportunities for reassessing the role of infrastructure and technologies in cities and how they contribute to greenhouse gas (GHG) emissions. Modern urbanization is predicated on complex, increasingly coupled infrastructure systems, and energy use continues to be largely met from fossil fuels. Until energy infrastructures evolve away from carbon-based fuels, GHG emissions are critically tied to the urbanization process. Further complicating the challenge of decoupling urban growth from GHG emissions are lock-in effects and interdependencies. This paper synthesizes state-of-the-art thinking for transportation, fuels, buildings, water, electricity, and waste systems and finds that GHG emissions assessments tend to view these systems as static and isolated from social and institutional systems. Despite significant understanding of methods and technologies for reducing infrastructure-related GHG emissions, physical, institutional, and cultural constraints continue to work against us, pointing to knowledge gaps that must be addressed. This paper identifies three challenge themes to improve our understanding of the role of infrastructure and technologies in urbanization processes and position these increasingly complex systems for low-carbon growth. The challenges emphasize how we can reimagine the role of infrastructure in the future and how people, institutions, and ecological systems interface with infrastructure.

  14. Alternative Fuels Data Center: Innovations Improve Electric Vehicle

    Science.gov Websites

    Charging InfrastructureA> Innovations Improve Electric Vehicle Charging Infrastructure to someone Magazine Provided by Maryland Public Television Related Videos Photo of a car Electric Vehicles Charge up at State Parks in West Virginia Dec. 9, 2017 Photo of a car Hydrogen Powers Fuel Cell Vehicles in

  15. Effects of 60-Heartz electric and magnetic fields on implanted cardiac pacemakers. Final report. [Hazards of power transmission line frequencies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bridges, J.E.; Frazier, M.J.

    1979-09-01

    The effects of 60-Hz electric and magnetic fields of exta-high voltage (EHV) transmission lines on the performance of implanted cardiac pacemakers were studied by: (1) in vitro bench tests of a total of thirteen cardiac pacemakers; (2) in vivo tests of six implanted cardiac pacemakers in baboons; and (3) non-hazardous skin measurement tests on four humans. Analytical methods were developed to predict the thresholds of body current and electric fields capable of affecting normal pacemaker operation in humans. The field strengths calculated to alter implanted pacemaker performance were compared with the range of maximum electric and magnetic field strengths amore » human would normally encounter under transmission lines of various voltages. Results indicate that the electric field or body current necessary to alter the normal operation of pacemakers is highly dependent on the type of pacemaker and the location of the implanted electrodes. However, cardiologists have not so far detected harmful effects of pacemaker reversion to the asynchronous mode in current types of pacemakers and with present methods of implantation. Such interferences can be eliminated by using advanced pacemakers less sensitive to 60-Hz voltages or by using implantation lead arrangements less sensitive to body current.« less

  16. Convective Heat Transfer Coefficients of Automatic Transmission Fluid Jets with Implications for Electric Machine Thermal Management: Preprint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bennion, Kevin; Moreno, Gilberto

    2015-09-29

    Thermal management for electric machines (motors/ generators) is important as the automotive industry continues to transition to more electrically dominant vehicle propulsion systems. Cooling of the electric machine(s) in some electric vehicle traction drive applications is accomplished by impinging automatic transmission fluid (ATF) jets onto the machine's copper windings. In this study, we provide the results of experiments characterizing the thermal performance of ATF jets on surfaces representative of windings, using Ford's Mercon LV ATF. Experiments were carried out at various ATF temperatures and jet velocities to quantify the influence of these parameters on heat transfer coefficients. Fluid temperatures weremore » varied from 50 degrees C to 90 degrees C to encompass potential operating temperatures within an automotive transaxle environment. The jet nozzle velocities were varied from 0.5 to 10 m/s. The experimental ATF heat transfer coefficient results provided in this report are a useful resource for understanding factors that influence the performance of ATF-based cooling systems for electric machines.« less

  17. Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stottler, Gary

    General Motors, LLC and energy partner Shell Hydrogen, LLC, deployed a system of hydrogen fuel cell electric vehicles integrated with a hydrogen fueling station infrastructure to operate under real world conditions as part of the U.S. Department of Energy's Controlled Hydrogen Fleet and Infrastructure Validation and Demonstration Project. This technical report documents the performance and describes the learnings from progressive generations of vehicle fuel cell system technology and multiple approaches to hydrogen generation and delivery for vehicle fueling.

  18. NREL's EVI-Pro Lite Tool Paves the Way for Future Electric Vehicle

    Science.gov Websites

    Electric Vehicle Infrastructure Planning NREL's EVI-Pro Lite Tool Paves the Way for Future Electric Vehicle electric vehicle charging station To assist state and local governments anticipating this type of growth in simplified version of the Electric Vehicle Infrastructure Projection Tool (EVI-Pro) model. Combining a sleek

  19. Cloud-based shaft torque estimation for electric vehicle equipped with integrated motor-transmission system

    NASA Astrophysics Data System (ADS)

    Zhu, Xiaoyuan; Zhang, Hui; Yang, Bo; Zhang, Guichen

    2018-01-01

    In order to improve oscillation damping control performance as well as gear shift quality of electric vehicle equipped with integrated motor-transmission system, a cloud-based shaft torque estimation scheme is proposed in this paper by using measurable motor and wheel speed signals transmitted by wireless network. It can help reduce computational burden of onboard controllers and also relief network bandwidth requirement of individual vehicle. Considering possible delays during signal wireless transmission, delay-dependent full-order observer design is proposed to estimate the shaft torque in cloud server. With these random delays modeled by using homogenous Markov chain, robust H∞ performance is adopted to minimize the effect of wireless network-induced delays, signal measurement noise as well as system modeling uncertainties on shaft torque estimation error. Observer parameters are derived by solving linear matrix inequalities, and simulation results using acceleration test and tip-in, tip-out test demonstrate the effectiveness of proposed shaft torque observer design.

  20. Design and control of a novel two-speed Uninterrupted Mechanical Transmission for electric vehicles

    NASA Astrophysics Data System (ADS)

    Fang, Shengnan; Song, Jian; Song, Haijun; Tai, Yuzhuo; Li, Fei; Sinh Nguyen, Truong

    2016-06-01

    Conventional all-electric vehicles (EV) adopt single-speed transmission due to its low cost and simple construction. However, with the adoption of this type of driveline system, development of EV technology leads to the growing performance requirements of drive motor. Introducing a multi-speed or two-speed transmission to EV offers the possibility of efficiency improvement of the whole powertrain. This paper presents an innovative two-speed Uninterrupted Mechanical Transmission (UMT), which consists of an epicyclic gearing system, a centrifugal clutch and a brake band, allowing the seamless shifting between two gears. Besides, driver's intention is recognized by the control system which is based on fuzzy logic controller (FLC), utilizing the signals of vehicle velocity and accelerator pedal position. The novel UMT shows better dynamic and comfort performance in compare with the optimized AMT with the same gear ratios. Comparison between the control strategy with recognition of driver intention and the conventional two-parameter gear shifting strategy is presented. And the simulation and analysis of the middle layer of optimal gearshift control algorithm is detailed. The results indicate that the UMT adopting FLC and optimal control method provides a significant improvement of energy efficiency, dynamic performance and shifting comfort for EV.

  1. Electrical utilities model for determining electrical distribution capacity

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fritz, R. L.

    1997-09-03

    In its simplest form, this model was to obtain meaningful data on the current state of the Site`s electrical transmission and distribution assets, and turn this vast collection of data into useful information. The resulting product is an Electrical Utilities Model for Determining Electrical Distribution Capacity which provides: current state of the electrical transmission and distribution systems; critical Hanford Site needs based on outyear planning documents; decision factor model. This model will enable Electrical Utilities management to improve forecasting requirements for service levels, budget, schedule, scope, and staffing, and recommend the best path forward to satisfy customer demands at themore » minimum risk and least cost to the government. A dynamic document, the model will be updated annually to reflect changes in Hanford Site activities.« less

  2. Downhole transmission system comprising a coaxial capacitor

    DOEpatents

    Hall, David R [Provo, UT; Pixton, David S [Lehi, UT; Johnson, Monte L [Orem, UT; Bartholomew, David B [Springville, UT; Hall, Jr., H. Tracy; Rawle, Michael [Springville, UT

    2011-05-24

    A transmission system in a downhole component comprises a plurality of data transmission elements. A coaxial cable having an inner conductor and an outer conductor is disposed within a passage in the downhole component such that at least one capacitor is disposed in the passage and having a first terminal coupled to the inner conductor and a second terminal coupled to the outer conductor. Preferably the transmission element comprises an electrically conducting coil. Preferably, within the passage a connector is adapted to electrically connect the inner conductor of the coaxial cable and the lead wire. The coaxial capacitor may be disposed between and in electrically communication with the connector and the passage. In another embodiment a connector is adapted to electrical connect a first and a second portion of the inner conductor of the coaxial cable and a coaxial capacitor is in electrical communication with the connector and the passage.

  3. Modeling the resilience of critical infrastructure: the role of network dependencies

    PubMed Central

    Guidotti, Roberto; Chmielewski, Hana; Unnikrishnan, Vipin; Gardoni, Paolo; McAllister, Therese; van de Lindt, John

    2017-01-01

    Water and wastewater network, electric power network, transportation network, communication network, and information technology network are among the critical infrastructure in our communities; their disruption during and after hazard events greatly affects communities’ well-being, economic security, social welfare, and public health. In addition, a disruption in one network may cause disruption to other networks and lead to their reduced functionality. This paper presents a unified theoretical methodology for the modeling of dependent/interdependent infrastructure networks and incorporates it in a six-step probabilistic procedure to assess their resilience. Both the methodology and the procedure are general, can be applied to any infrastructure network and hazard, and can model different types of dependencies between networks. As an illustration, the paper models the direct effects of seismic events on the functionality of a potable water distribution network and the cascading effects of the damage of the electric power network (EPN) on the potable water distribution network (WN). The results quantify the loss of functionality and delay in the recovery process due to dependency of the WN on the EPN. The results show the importance of capturing the dependency between networks in modeling the resilience of critical infrastructure. PMID:28825037

  4. Modeling the resilience of critical infrastructure: the role of network dependencies.

    PubMed

    Guidotti, Roberto; Chmielewski, Hana; Unnikrishnan, Vipin; Gardoni, Paolo; McAllister, Therese; van de Lindt, John

    2016-01-01

    Water and wastewater network, electric power network, transportation network, communication network, and information technology network are among the critical infrastructure in our communities; their disruption during and after hazard events greatly affects communities' well-being, economic security, social welfare, and public health. In addition, a disruption in one network may cause disruption to other networks and lead to their reduced functionality. This paper presents a unified theoretical methodology for the modeling of dependent/interdependent infrastructure networks and incorporates it in a six-step probabilistic procedure to assess their resilience. Both the methodology and the procedure are general, can be applied to any infrastructure network and hazard, and can model different types of dependencies between networks. As an illustration, the paper models the direct effects of seismic events on the functionality of a potable water distribution network and the cascading effects of the damage of the electric power network (EPN) on the potable water distribution network (WN). The results quantify the loss of functionality and delay in the recovery process due to dependency of the WN on the EPN. The results show the importance of capturing the dependency between networks in modeling the resilience of critical infrastructure.

  5. US EPA/ORD Condition Assessment Research for Drinking Water Conveyance Infrastructure

    EPA Science Inventory

    This presentation describes research on condition assessment for drinking water transmission and distribution systems that EPA is conducting under the U.S. Environmental Protection Agency’s Aging Water Infrastructure (AWI) Research Program. This research program will help U.S. ...

  6. Is there a need for government interventions to adapt energy infrastructures to climate change? A German case study

    NASA Astrophysics Data System (ADS)

    Groth, Markus; Cortekar, Jörg

    2015-04-01

    infrastructure, there might also occur efficiency losses in electricity transmission due to very high or very low temperatures. While vulnerabilities in power generation primarily result in efficiency losses, interferences on the grid level could cause power outages with cascade effects influencing other sectors of society and economy. The paper argues that these possible impacts of a changing climate should be taken into account in the upcoming infrastructure projects in the course of the Energiewende. Therefore governmental intervention - like legal obligations or incentives by the use of economic instruments - are for example justifiable regarding measures to adapt the grid infrastructure as a critical infrastructure that needs to be protected against current and future impacts of climate change.

  7. A two-phase control algorithm for gear-shifting in a novel multi-speed transmission for electric vehicles

    NASA Astrophysics Data System (ADS)

    Roozegar, M.; Angeles, J.

    2018-05-01

    In light of the current low energy-storage capacity of electric batteries, multi-speed transmissions (MSTs) are being considered for applications in electric vehicles (EVs), since MSTs decrease the energy consumption of the EV via gear-shifting. Nonetheless, swiftness and seamlessness are the major concerns in gear-shifting. This study focuses on developing a gear-shifting control scheme for a novel MST designed for EVs. The main advantages of the proposed MST are simplicity and modularity. Firstly, the dynamics model of the transmission is formulated. Then, a two-phase algorithm is proposed for shifting between each two gear ratios, which guarantees a smooth and swift shift. In other words, a separate control set is applied for shifting between each gear pair, which includes two independent PID controllers, tuned using trial-and-error and a genetic algorithm (GA), for the two steps of the algorithm and a switch. A supervisory controller is also employed to choose the proper PID gains, called PID gain-scheduling. Simulation results for various controllers and conditions are reported and compared, indicating that the proposed scheme is highly promising for a desired gear-shifting even in the presence of an unknown external disturbance.

  8. Strategic plan for infrastructure optimization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Donley, C.D.

    This document represents Fluor Daniel Hanford`s and DynCorp`s Tri-Cities Strategic Plan for Fiscal Years 1998--2002, the road map that will guide them into the next century and their sixth year of providing safe and cost effective infrastructure services and support to the Department of Energy (DOE) and the Hanford Site. The Plan responds directly to the issues raised in the FDH/DOE Critical Self Assessment specifically: (1) a strategy in place to give DOE the management (systems) and physical infrastructure for the future; (2) dealing with the barriers that exist to making change; and (3) a plan to right-size the infrastructuremore » and services, and reduce the cost of providing services. The Plan incorporates initiatives from several studies conducted in Fiscal Year 1997 to include: the Systems Functional Analysis, 200 Area Water Commercial Practices Plan, $ million Originated Cost Budget Achievement Plan, the 1OO Area Vacate Plan, the Railroad Shutdown Plan, as well as recommendations from the recently completed Review of Hanford Electrical Utility. These and other initiatives identified over the next five years will result in significant improvements in efficiency, allowing a greater portion of the infrastructure budget to be applied to Site cleanup. The Plan outlines a planning and management process that defines infrastructure services and structure by linking site technical base line data and customer requirements to work scope and resources. The Plan also provides a vision of where Site infrastructure is going and specific initiatives to get there.« less

  9. A Model for Optimizing the Combination of Solar Electricity Generation, Supply Curtailment, Transmission and Storage

    NASA Astrophysics Data System (ADS)

    Perez, Marc J. R.

    /south bearing. Using technical and economic data reflecting today's real costs for solar generation technology, storage and electric transmission in combination with this model, we determined the minimum cost combination of these solutions to transform the variable output from solar plants into 3 distinct output profiles: A constant output equivalent to a baseload power plant, a well-defined seasonally-variable output with no weather-induced variability and a variable output but one that is 100% predictable on a multi-day ahead basis. In order to do this, over 14,000 model runs were performed by varying the desired output profile, the amount of energy curtailment, the penetration of solar energy and the geographic region across the continental United States. Despite the cost of supplementary electric transmission, geographic interconnection has the potential to reduce the levelized cost of electricity when meeting any of the studied output profiles by over 65% compared to when only storage is used. Energy curtailment, despite the cost of underutilizing solar energy capacity, has the potential to reduce the total cost of electricity when meeting any of the studied output profiles by over 75% compared to when only storage is used. The three variability mitigation strategies are thankfully not mutually exclusive. When combined at their ideal levels, each of the regions studied saw a reduction in cost of electricity of over 80% compared to when only energy storage is used to meet a specified output profile. When including current costs for solar generation, transmission and energy storage, an optimum configuration can conservatively provide guaranteed baseload power generation with solar across the entire continental United States (equivalent to a nuclear power plant with no down time) for less than 0.19 per kilowatt-hour. If solar is preferentially clustered in the southwest instead of evenly spread throughout the United States, and we adopt future expected costs for solar

  10. FERC examines transmission access pricing policies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burkhart, L.A.

    1993-02-15

    The Federal Energy Regulatory Commission (FERC) has approved two orders dealing with transmission pricing issues that evolved from its March 1992 Pennsylvania Electric Co. (Penelec) decision dealing with cost recovery of transmission plant expansion. Commissioner Betsy Moler said the cases represented the first time the FERC has used incremental rates for wheeling transactions. In the first new order, Public Service Electric Gas Co. proposed charging for third-party transmission services to recover the sum of its standard embedded cost rate and the net incremental cost of making upgrades to its integrated transmission system. Public Service sought to provide service to EEAmore » I Limited, which proposed building and operating a cogeneration facility at a United States Gypsum Co. plant in New Jersey. Consolidated Edison Company of New York Inc. had agreed to purchase the project's output. In rejecting Public Service's proposal, the FERC ruled the utility must charge a transmission rate that is the higher of either its embedded cost rate or its incremental cost rate of accelerated expansion. (In this instance, the incremental rate was higher). In the second new order, Public Service Co. of Colorado (PSCC) filed a proposed open access transmission service tariff related to its acquisition of facilities from Colorado-Ute Electric Association Inc. The FERC rejected PSCC's tariff request that would have required a new transmission customer (in the event PSCC modified its integrated transmission grid) to pay the sum of PSCC's standard transmission rate (reflecting the average cost of the grid facilities) plus the expansion cost (reflecting the incremental facility cost).« less

  11. Electric Utility Transmission and Distribution Line Engineering Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peter McKenny

    2010-08-31

    Economic development in the United States depends on a reliable and affordable power supply. The nation will need well educated engineers to design a modern, safe, secure, and reliable power grid for our future needs. An anticipated shortage of qualified engineers has caused considerable concern in many professional circles, and various steps are being taken nationwide to alleviate the potential shortage and ensure the North American power system's reliability, and our world-wide economic competitiveness. To help provide a well-educated and trained workforce which can sustain and modernize the nation's power grid, Gonzaga University's School of Engineering and Applied Science hasmore » established a five-course (15-credit hour) Certificate Program in Transmission and Distribution (T&D) Engineering. The program has been specifically designed to provide working utility engineering professionals with on-line access to advanced engineering courses which cover modern design practice with an industry-focused theoretical foundation. A total of twelve courses have been developed to-date and students may select any five in their area of interest for the T&D Certificate. As each course is developed and taught by a team of experienced engineers (from public and private utilities, consultants, and industry suppliers), students are provided a unique opportunity to interact directly with different industry experts over the eight weeks of each course. Course material incorporates advanced aspects of civil, electrical, and mechanical engineering disciplines that apply to power system design and are appropriate for graduate engineers. As such, target students for the certificate program include: (1) recent graduates with a Bachelor of Science Degree in an engineering field (civil, mechanical, electrical, etc.); (2) senior engineers moving from other fields to the utility industry (i.e. paper industry to utility engineering or project management positions); and (3) regular working

  12. Experimental comparison of direct detection Nyquist SSB transmission based on silicon dual-drive and IQ Mach-Zehnder modulators with electrical packaging.

    PubMed

    Ruan, Xiaoke; Li, Ke; Thomson, David J; Lacava, Cosimo; Meng, Fanfan; Demirtzioglou, Iosif; Petropoulos, Periklis; Zhu, Yixiao; Reed, Graham T; Zhang, Fan

    2017-08-07

    We have designed and fabricated a silicon photonic in-phase-quadrature (IQ) modulator based on a nested dual-drive Mach-Zehnder structure incorporating electrical packaging. We have assessed its use for generating Nyquist-shaped single sideband (SSB) signals by operating it either as an IQ Mach-Zehnder modulator (IQ-MZM) or using just a single branch of the dual-drive Mach-Zehnder modulator (DD-MZM). The impact of electrical packaging on the modulator bandwidth is also analyzed. We demonstrate 40 Gb/s (10Gbaud) 16-ary quadrature amplitude modulation (16-QAM) Nyquist-shaped SSB transmission over 160 km standard single mode fiber (SSMF). Without using any chromatic dispersion compensation, the bit error rates (BERs) of 5.4 × 10 -4 and 9.0 × 10 -5 were measured for the DD-MZM and IQ-MZM, respectively, far below the 7% hard-decision forward error correction threshold. The performance difference between IQ-MZM and DD-MZM is most likely due to the non-ideal electrical packaging. Our work is the first experimental comparison between silicon IQ-MZM and silicon DD-MZM in generating SSB signals. We also demonstrate 50 Gb/s (12.5Gbaud) 16-QAM Nyquist-shaped SSB transmission over 320 km SSMF with a BER of 2.7 × 10 -3 . Both the silicon IQ-MZM and the DD-MZM show potential for optical transmission at metro scale and for data center interconnection.

  13. An Insight on Right of Way and its Cost for Power Transmission Cable and Conventional Overhead Transmission Lines

    NASA Astrophysics Data System (ADS)

    Khandelwal, P.; Pachori, A.; Khandelwal, T.

    2013-12-01

    This paper provides the complete information related to Right of Way (RoW) for the construction of new power transmission line (TL) in terms of present cost for overhead transmission line and underground XLPE transmission cable. The former part of the paper describes the general procedure and rules for acquisition of land for RoW by transmission asset owner (TAO) while in the later part the cost associated to acquire RoW and its impact on the cost of adjacent land have been detailed. It also discusses the actual dismantling cost including the cost of waste metal what TAO get after completion of lifecycle of TL due to increase in metal prices. In this paper cost of RoW after completion of lifecycle of TL is also highlighted. This paper compares the cost of RoW for overhead transmission line and underground XLPE transmission cable for construction of new TL. Also for old transmission infrastructure cost of RoW for change from overhead transmission line to underground XLPE transmission cable is detailed by application of replacement model.

  14. Toward Information Infrastructure Studies: Ways of Knowing in a Networked Environment

    NASA Astrophysics Data System (ADS)

    Bowker, Geoffrey C.; Baker, Karen; Millerand, Florence; Ribes, David

    This article presents Information Infrastructure Studies, a research area that takes up some core issues in digital information and organization research. Infrastructure Studies simultaneously addresses the technical, social, and organizational aspects of the development, usage, and maintenance of infrastructures in local communities as well as global arenas. While infrastructure is understood as a broad category referring to a variety of pervasive, enabling network resources such as railroad lines, plumbing and pipes, electrical power plants and wires, this article focuses on information infrastructure, such as computational services and help desks, or federating activities such as scientific data repositories and archives spanning the multiple disciplines needed to address such issues as climate warming and the biodiversity crisis. These are elements associated with the internet and, frequently today, associated with cyberinfrastructure or e-science endeavors. We argue that a theoretical understanding of infrastructure provides the context for needed dialogue between design, use, and sustainability of internet-based infrastructure services. This article outlines a research area and outlines overarching themes of Infrastructure Studies. Part one of the paper presents definitions for infrastructure and cyberinfrastructure, reviewing salient previous work. Part two portrays key ideas from infrastructure studies (knowledge work, social and political values, new forms of sociality, etc.). In closing, the character of the field today is considered.

  15. Assessment of Charging Infrastructure for Plug-in Electric Vehicles at Naval Air Station Whidbey Island: Task 3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schey, Steve; Francfort, Jim

    2015-07-01

    Several U.S. Department of Defense base studies have been conducted to identify potential U.S. Department of Defense transportation systems that are strong candidates for introduction or expansion of plug-in electric vehicles (PEVs). Task 1 consisted of a survey of the non-tactical fleet of vehicles at NASWI to begin the review of vehicle mission assignments and types of vehicles in service. Task 2 selected vehicles for further monitoring and involved identifying daily operational characteristics of these select vehicles. Data logging of vehicle movements was initiated in order to characterize the vehicle’s mission. The Task 3 Vehicle Utilization report provided the resultsmore » of the data analysis and observations related to the replacement of current vehicles with PEVs. This report provides an assessment of charging infrastructure required to support the suggested PEV replacements.« less

  16. Data transmission element for downhole drilling components

    DOEpatents

    Hall, David R.; Hall, Jr., H. Tracy; Pixton, David S.; Dahlgren, Scott; Fox, Joe; Sneddon, Cameron; Briscoe, Michael

    2006-01-31

    A robust data transmission element for transmitting information between downhole components, such as sections of drill pipe, in the presence of hostile environmental conditions, such as heat, dirt, rocks, mud, fluids, lubricants, and the like. The data transmission element components include a generally U-shaped annular housing, a generally U-shaped magnetically conductive, electrically insulating element such as ferrite, and an insulated conductor. Features on the magnetically conducting, electrically insulating element and the annular housing create a pocket when assembled. The data transmission element is filled with a polymer to retain the components within the annular housing by filling the pocket with the polymer. The polymer can bond with the annular housing and the insulated conductor but preferably not the magnetically conductive, electrically insulating element. A data transmission element is mounted within a recess proximate a mating surface of a downhole drilling component, such as a section of drill pipe.

  17. Assessment of risk factors for death in electrical injury.

    PubMed

    Dokov, William

    2009-02-01

    Fatal high-voltage injuries present a problem which has not yet been studied sufficiently in the context of interaction between the human body and electricity, as a technical, anthropogenic and natural phenomenon. The forensic medicine records of 291 cases of death caused by high-voltage current for a 41-year-long period (1965-2006) were examined in retrospect. The descriptive statistical analyses were made using the SPSS 11.0 software. Death was found to result most commonly from contact between the deceased and elements of the power transmission and distribution grid: (41.24%), and from the action of lightning: (32.3%), the difference in their relative share being insignificant. Much more rarely, death was due to contact with construction and repair electrical devices: (7.56%), or with elements of the power transport railway infrastructure: (6.87%). Death resulting from contact with agricultural electrical devices was only occasional: (0.68%). The victims' average age was 36.19 years. Our analysis indicates that the relative share (43.98%) of the victims is the highest in the age period between 25 and 44. The ratio between women and men is 1:21.38.

  18. Strategic charging infrastructure deployment for electric vehicles.

    DOT National Transportation Integrated Search

    2016-05-01

    Electric vehicles (EV) are promoted as a foreseeable future vehicle technology to reduce dependence on fossil fuels and greenhouse : gas emissions associated with conventional vehicles. This paper proposes a data-driven approach to improving the elec...

  19. Relative Localization in Wireless Sensor Networks for Measurement of Electric Fields under HVDC Transmission Lines

    PubMed Central

    Cui, Yong; Wang, Qiusheng; Yuan, Haiwen; Song, Xiao; Hu, Xuemin; Zhao, Luxing

    2015-01-01

    In the wireless sensor networks (WSNs) for electric field measurement system under the High-Voltage Direct Current (HVDC) transmission lines, it is necessary to obtain the electric field distribution with multiple sensors. The location information of each sensor is essential to the correct analysis of measurement results. Compared with the existing approach which gathers the location information by manually labelling sensors during deployment, the automatic localization can reduce the workload and improve the measurement efficiency. A novel and practical range-free localization algorithm for the localization of one-dimensional linear topology wireless networks in the electric field measurement system is presented. The algorithm utilizes unknown nodes' neighbor lists based on the Received Signal Strength Indicator (RSSI) values to determine the relative locations of nodes. The algorithm is able to handle the exceptional situation of the output permutation which can effectively improve the accuracy of localization. The performance of this algorithm under real circumstances has been evaluated through several experiments with different numbers of nodes and different node deployments in the China State Grid HVDC test base. Results show that the proposed algorithm achieves an accuracy of over 96% under different conditions. PMID:25658390

  20. Relative localization in wireless sensor networks for measurement of electric fields under HVDC transmission lines.

    PubMed

    Cui, Yong; Wang, Qiusheng; Yuan, Haiwen; Song, Xiao; Hu, Xuemin; Zhao, Luxing

    2015-02-04

    In the wireless sensor networks (WSNs) for electric field measurement system under the High-Voltage Direct Current (HVDC) transmission lines, it is necessary to obtain the electric field distribution with multiple sensors. The location information of each sensor is essential to the correct analysis of measurement results. Compared with the existing approach which gathers the location information by manually labelling sensors during deployment, the automatic localization can reduce the workload and improve the measurement efficiency. A novel and practical range-free localization algorithm for the localization of one-dimensional linear topology wireless networks in the electric field measurement system is presented. The algorithm utilizes unknown nodes' neighbor lists based on the Received Signal Strength Indicator (RSSI) values to determine the relative locations of nodes. The algorithm is able to handle the exceptional situation of the output permutation which can effectively improve the accuracy of localization. The performance of this algorithm under real circumstances has been evaluated through several experiments with different numbers of nodes and different node deployments in the China State Grid HVDC test base. Results show that the proposed algorithm achieves an accuracy of over 96% under different conditions.

  1. 75 FR 26206 - Implementing the National Broadband Plan by Studying the Communications Requirements of Electric...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-11

    ... information about electricity infrastructure's current and projected communications requirements, as well as...'s electricity infrastructure need to employ adequate communications technologies that serve their... Smart Grid and the other technologies that will evolve and change how electricity is produced, consumed...

  2. Geography and the costs of urban energy infrastructure: The case of electricity and natural gas capital investments

    NASA Astrophysics Data System (ADS)

    Senyel, Muzeyyen Anil

    Investments in the urban energy infrastructure for distributing electricity and natural gas are analyzed using (1) property data measuring distribution plant value at the local/tax district level, and (2) system outputs such as sectoral numbers of customers and energy sales, input prices, company-specific characteristics such as average wages and load factor. Socio-economic and site-specific urban and geographic variables, however, often been neglected in past studies. The purpose of this research is to incorporate these site-specific characteristics of electricity and natural gas distribution into investment cost model estimations. These local characteristics include (1) socio-economic variables, such as income and wealth; (2) urban-related variables, such as density, land-use, street pattern, housing pattern; (3) geographic and environmental variables, such as soil, topography, and weather, and (4) company-specific characteristics such as average wages, and load factor. The classical output variables include residential and commercial-industrial customers and sales. In contrast to most previous research, only capital investments at the local level are considered. In addition to aggregate cost modeling, the analysis focuses on the investment costs for the system components: overhead conductors, underground conductors, conduits, poles, transformers, services, street lighting, and station equipment for electricity distribution; and mains, services, regular and industrial measurement and regulation stations for natural gas distribution. The Box-Cox, log-log and additive models are compared to determine the best fitting cost functions. The Box-Cox form turns out to be superior to the other forms at the aggregate level and for network components. However, a linear additive form provides a better fit for end-user related components. The results show that, in addition to output variables and company-specific variables, various site-specific variables are statistically

  3. Comment on "Dynamics and properties of waves in a modified Noguchi electrical transmission line"

    NASA Astrophysics Data System (ADS)

    Kenmogne, Fabien; Yemélé, David; Marquié, Patrick

    2016-09-01

    A recent paper [Phys. Rev. E 91, 022925 (2015), 10.1103/PhysRevE.91.022925] presents the derivation of the nonlinear equation modeling envelope waves in a specific case of band passed filter discrete nonlinear electrical transmission line (NLTL), called "A modified Noguchi electrical transmission line" according to the authors. Using the reductive perturbation approach in the semidiscrete approximation, they showed that the modulated waves propagating in this NLTL are described by the ordinary nonlinear Schrödinger (NLS) equation. On the basis of their results, the authors claimed that all previous works on the band passed filter NLTL, which considered the vanishing of the dc component of the signal voltage, are incorrect, and this dc term is nonzero. As a consequence, the dispersion and nonlinearity coefficients of the NLS equation are strongly different from those usually obtained, and they found, according to the sign of the product P Q , the existence of one more region (compared to the work of Marquié et al. [Phys. Rev. E 49, 828 (1994)], 10.1103/PhysRevE.49.828) in the dispersion curve that allows the motion of envelope solitons of higher frequency in the system. In this Comment we provide sufficient theoretical and numerical evidence showing that the evidence obtained by the authors otherwise is due to certain terms missed in their mathematical developments when they derived the NLS equation. Our results also suggest that the previous work of Marquié and co-workers correctly predict the fact that the dc term of the signal voltage does not exist and there exist only two regions in the dispersion curve according to the sign of the product P Q .

  4. IMPACTS ON HUMAN HEALTH FROM THE COAL AND NUCLEAR FUEL CYCLES AND OTHER TECHNOLOGIES ASSOCIATED WITH ELECTRIC POWER GENERATION AND TRANSMISSION

    EPA Science Inventory

    The report evaluates major public health impacts of electric power generation and transmission associated with the nuclear fuel cycle and with coal use. Only existing technology is evaluated. For the nuclear cycle, effects of future use of fuel reprocessing and long-term radioact...

  5. Next generation information communication infrastructure and case studies for future power systems

    NASA Astrophysics Data System (ADS)

    Qiu, Bin

    As power industry enters the new century, powerful driving forces, uncertainties and new functions are compelling electric utilities to make dramatic changes in their information communication infrastructure. Expanding network services such as real time measurement and monitoring are also driving the need for more bandwidth in the communication network. These needs will grow further as new remote real-time protection and control applications become more feasible and pervasive. This dissertation addresses two main issues for the future power system information infrastructure: communication network infrastructure and associated power system applications. Optical networks no doubt will become the predominant data transmission media for next generation power system communication. The rapid development of fiber optic network technology poses new challenges in the areas of topology design, network management and real time applications. Based on advanced fiber optic technologies, an all-fiber network is investigated and proposed. The study will cover the system architecture and data exchange protocol aspects. High bandwidth, robust optical networks could provide great opportunities to the power system for better service and efficient operation. In the dissertation, different applications are investigated. One of the typical applications is the SCADA information accessing system. An Internet-based application for the substation automation system will be presented. VLSI (Very Large Scale Integration) technology is also used for one-line diagrams auto-generation. High transition rate and low latency optical network is especially suitable for power system real time control. In the dissertation, a new local area network based Load Shedding Controller (LSC) for isolated power system will be presented. By using PMU (Phasor Measurement Unit) and fiber optic network, an AGE (Area Generation Error) based accurate wide area load shedding scheme will also be proposed. The objective

  6. Demonstration of 4×100 Gbps discrete multitone transmission using electric absorption modulated laser at 1550-nm for dense wavelength division multiplexing intradata center connect

    NASA Astrophysics Data System (ADS)

    Xu, Yuming; Yu, Jianjun; Li, Xinying

    2017-03-01

    We experimentally demonstrate 4 lanes up to 400 Gbps discrete multitone transmission using an electric absorption modulated laser (EML) at 1550-nm for dense wavelength division multiplexing (DWDM) intradata center connects. This is the first demonstration of 4×100 Gb/s transmission using EML at 1550-nm, and it is compatible with the DWDM system at C-band.

  7. Optimal Wind Energy Integration in Large-Scale Electric Grids

    NASA Astrophysics Data System (ADS)

    Albaijat, Mohammad H.

    The major concern in electric grid operation is operating under the most economical and reliable fashion to ensure affordability and continuity of electricity supply. This dissertation investigates the effects of such challenges, which affect electric grid reliability and economic operations. These challenges are: 1. Congestion of transmission lines, 2. Transmission lines expansion, 3. Large-scale wind energy integration, and 4. Phaser Measurement Units (PMUs) optimal placement for highest electric grid observability. Performing congestion analysis aids in evaluating the required increase of transmission line capacity in electric grids. However, it is necessary to evaluate expansion of transmission line capacity on methods to ensure optimal electric grid operation. Therefore, the expansion of transmission line capacity must enable grid operators to provide low-cost electricity while maintaining reliable operation of the electric grid. Because congestion affects the reliability of delivering power and increases its cost, the congestion analysis in electric grid networks is an important subject. Consequently, next-generation electric grids require novel methodologies for studying and managing congestion in electric grids. We suggest a novel method of long-term congestion management in large-scale electric grids. Owing to the complication and size of transmission line systems and the competitive nature of current grid operation, it is important for electric grid operators to determine how many transmission lines capacity to add. Traditional questions requiring answers are "Where" to add, "How much of transmission line capacity" to add, and "Which voltage level". Because of electric grid deregulation, transmission lines expansion is more complicated as it is now open to investors, whose main interest is to generate revenue, to build new transmission lines. Adding a new transmission capacity will help the system to relieve the transmission system congestion, create

  8. Housing assembly for electric vehicle transaxle

    DOEpatents

    Kalns, Ilmars

    1981-01-01

    Disclosed is a drive assembly (10) for an electrically powered vehicle (12). The assembly includes a transaxle (16) having a two-speed transmission (40) and a drive axle differential (46) disposed in a unitary housing assembly (38), an oil-cooled prime mover or electric motor (14) for driving the transmission input shaft (42), an adapter assembly (24) for supporting the prime mover on the transaxle housing assembly, and a hydraulic system (172) providing pressurized oil flow for cooling and lubricating the electric motor and transaxle and for operating a clutch (84) and a brake (86) in the transmission to shift between the two-speed ratios of the transmission. The adapter assembly allows the prime mover to be supported in several positions on the transaxle housing. The brake is spring-applied and locks the transmission in its low-speed ratio should the hydraulic system fail. The hydraulic system pump is driven by an electric motor (212) independent of the prime mover and transaxle.

  9. A life-cycle approach to technology, infrastructure, and climate policy decision making: Transitioning to plug-in hybrid electric vehicles and low-carbon electricity

    NASA Astrophysics Data System (ADS)

    Samaras, Constantine

    cycle assessment to evaluate options and opportunities for large GHG reductions from plug-in hybrids. After the options and uncertainties are framed, engineering economic analysis is used to evaluate the policy actions required for adoption of PHEVs at scale and the implications for low-carbon electricity investments. A logistic PHEV adoption model is constructed to parameterize implications for low-carbon electricity infrastructure investments and climate policy. This thesis concludes with an examination of what lessons can be learned for climate, innovation, and low-carbon energy policies from the evolution of wind power from an emerging alternative energy technology to a utility-scale power source. Policies to promote PHEVs and other emerging energy technologies can take lessons learned from the successes and challenges of wind power's development to optimize low-carbon energy policy and R&D programs going forward. The need for integrated climate policy, energy policy, sustainability, and urban mobility solutions will accelerate in the next two decades as concerns regarding GHG emissions and petroleum resources continue to be environmental and economic priorities. To assist in informing the discussions on climate policy and low-carbon energy R&D, this research and its methods will provide stakeholders in government and industry with plug-in hybrid and energy policy choices based on life cycle assessment, engineering economics, and systems analysis.

  10. Infectious Disease Transmission during Organ and Tissue Transplantation

    PubMed Central

    Kuehnert, Matthew J.; Fishman, Jay A.

    2012-01-01

    Infectious disease transmission through organ and tissue transplantation has been associated with severe complications in recipients. Determination of donor-derived infectious risk associated with organ and tissue transplantation is challenging and limited by availability and performance characteristics of current donor epidemiologic screening (e.g., questionnaire) and laboratory testing tools. Common methods and standards for evaluating potential donors of organs and tissues are needed to facilitate effective data collection for assessing the risk for infectious disease transmission. Research programs can use advanced microbiological technologies to define infectious risks posed by pathogens that are known to be transplant transmissible and provide insights into transmission potential of emerging infectious diseases for which transmission characteristics are unknown. Key research needs are explored. Stakeholder collaboration for surveillance and research infrastructure is required to enhance transplant safety. PMID:22840823

  11. Cascading of Fluctuations in Interdependent Energy Infrastructures. Gas-Grid Coupling

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chertkov, Michael; Lebedev, Vladimir; Backhaus, Scott N.

    2014-09-05

    The revolution of hydraulic fracturing has dramatically increased the supply and lowered the cost of natural gas in the United States driving an expansion of natural gas-fired generation capacity in many electrical grids. Unrelated to the natural gas expansion, lower capital costs and renewable portfolio standards are driving an expansion of intermittent renewable generation capacity such as wind and photovoltaic generation. These two changes may potentially combine to create new threats to the reliability of these interdependent energy infrastructures. Natural gas-fired generators are often used to balance the fluctuating output of wind generation. However, the time-varying output of these generatorsmore » results in time-varying natural gas burn rates that impact the pressure in interstate transmission pipelines. Fluctuating pressure impacts the reliability of natural gas deliveries to those same generators and the safety of pipeline operations. We adopt a partial differential equation model of natural gas pipelines and use this model to explore the effect of intermittent wind generation on the fluctuations of pressure in natural gas pipelines. The mean square pressure fluctuations are found to grow linearly in time with points of maximum deviation occurring at the locations of flow reversals.« less

  12. Energy Regulation Effects on Critical Infrastructure Protection

    DTIC Science & Technology

    2008-12-01

    Holding Company Act (1935) PURPA Public Utility Regulatory Policies Act (1978) QF Qualifying Facility RTO Regional Transmission Organization SEC...1935 (PUHCA) and the Federal Power Act; the Public Utility Regulatory Policies Act of 1978 ( PURPA ); and the Energy Policy Acts of 1992 (EPAct 1992) and...Congress passed the Public Utility Regulatory Policies Act ( PURPA ) in 1978 which required electric utilities to buy electricity from other generating

  13. Parallel Infrastructure Modeling and Inversion Module for E4D

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    2014-10-09

    Electrical resistivity tomography ERT is a method of imaging the electrical conductivity of the subsurface. Electrical conductivity is a useful metric for understanding the subsurface because it is governed by geomechanical and geochemical properties that drive subsurface systems. ERT works by injecting current into the subsurface across a pair of electrodes, and measuring the corresponding electrical potential response across another pair of electrodes. Many such measurements are strategically taken across an array of electrodes to produce an ERT data set. These data are then processed through a computationally demanding process known as inversion to produce an image of the subsurfacemore » conductivity structure that gave rise to the measurements. Data can be inverted to provide 2D images, 3D images, or in the case of time-lapse 3D imaging, 4D images. ERT is generally not well suited for environments with buried electrically conductive infrastructure such as pipes, tanks, or well casings, because these features tend to dominate and degrade ERT images. This reduces or eliminates the utility of ERT imaging where it would otherwise be highly useful for, for example, imaging fluid migration from leaking pipes, imaging soil contamination beneath leaking subusurface tanks, and monitoring contaminant migration in locations with dense network of metal cased monitoring wells. The location and dimension of buried metallic infrastructure is often known. If so, then the effects of the infrastructure can be explicitly modeled within the ERT imaging algorithm, and thereby removed from the corresponding ERT image. However,there are a number of obstacles limiting this application. 1) Metallic infrastructure cannot be accurately modeled with standard codes because of the large contrast in conductivity between the metal and host material. 2) Modeling infrastructure in true dimension requires the computational mesh to be highly refined near the metal inclusions, which increases

  14. El Paso Electric Company Diablo Substation to the US-Mexico border 115kV transmission line project. Final Environmental Assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-04-01

    This Environmental Assessment documents the analysis of alternative corridors for development and operation of a proposed 115 kilovolt transmission line using private lands and transporting power to the US-Mexico international border. The project will require (1) an amendment to El Paso Electric Company`s existing export authorization to transfer power across this border, and (2) a Presidential Permit for construction of the transmission line. The project would be located in Dona Ana county in southern New Mexico, approximately five miles west of El Paso, Texas. The alternative corridors, specific locations within those corridors, and structure types are identified and analyzed inmore » the environmental studies.« less

  15. Correlative transmission electron microscopy and electrical properties study of switchable phase-change random access memory line cells

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Oosthoek, J. L. M.; Kooi, B. J., E-mail: B.J.Kooi@rug.nl; Voogt, F. C.

    2015-02-14

    Phase-change memory line cells, where the active material has a thickness of 15 nm, were prepared for transmission electron microscopy (TEM) observation such that they still could be switched and characterized electrically after the preparation. The result of these observations in comparison with detailed electrical characterization showed (i) normal behavior for relatively long amorphous marks, resulting in a hyperbolic dependence between SET resistance and SET current, indicating a switching mechanism based on initially long and thin nanoscale crystalline filaments which thicken gradually, and (ii) anomalous behavior, which holds for relatively short amorphous marks, where initially directly a massive crystalline filament ismore » formed that consumes most of the width of the amorphous mark only leaving minor residual amorphous regions at its edges. The present results demonstrate that even in (purposely) thick TEM samples, the TEM sample preparation hampers the probability to observe normal behavior and it can be debated whether it is possible to produce electrically switchable TEM specimen in which the memory cells behave the same as in their original bulk embedded state.« less

  16. Correlative transmission electron microscopy and electrical properties study of switchable phase-change random access memory line cells

    NASA Astrophysics Data System (ADS)

    Oosthoek, J. L. M.; Voogt, F. C.; Attenborough, K.; Verheijen, M. A.; Hurkx, G. A. M.; Gravesteijn, D. J.; Kooi, B. J.

    2015-02-01

    Phase-change memory line cells, where the active material has a thickness of 15 nm, were prepared for transmission electron microscopy (TEM) observation such that they still could be switched and characterized electrically after the preparation. The result of these observations in comparison with detailed electrical characterization showed (i) normal behavior for relatively long amorphous marks, resulting in a hyperbolic dependence between SET resistance and SET current, indicating a switching mechanism based on initially long and thin nanoscale crystalline filaments which thicken gradually, and (ii) anomalous behavior, which holds for relatively short amorphous marks, where initially directly a massive crystalline filament is formed that consumes most of the width of the amorphous mark only leaving minor residual amorphous regions at its edges. The present results demonstrate that even in (purposely) thick TEM samples, the TEM sample preparation hampers the probability to observe normal behavior and it can be debated whether it is possible to produce electrically switchable TEM specimen in which the memory cells behave the same as in their original bulk embedded state.

  17. Condition Assessment Technologies for Water Transmission and Distribution Systems

    EPA Science Inventory

    As part of the U.S. Environmental Protection Agency’s (EPA’s) Aging Water Infrastructure Research Program, this research was conducted to identify and characterize the state of the technology for structural condition assessment of drinking water transmission and distribution syst...

  18. Hybrid-Vehicle Transmission System

    NASA Technical Reports Server (NTRS)

    Lupo, G.; Dotti, G.

    1985-01-01

    Continuously-variable transmission system for hybrid vehicles couples internal-combustion engine and electric motor section, either individually or in parallel, to power vehicle wheels during steering and braking.

  19. 49.6 Gb/s direct detection DMT transmission over 40 km single mode fibre using an electrically packaged silicon photonic modulator.

    PubMed

    Lacava, C; Cardea, I; Demirtzioglou, I; Khoja, A E; Ke, Li; Thomson, D J; Ruan, X; Zhang, F; Reed, G T; Richardson, D J; Petropoulos, P

    2017-11-27

    We present the characterization of a silicon Mach-Zehnder modulator with electrical packaging and show that it exhibits a large third-order intermodulation spurious-free dynamic range (> 100 dB Hz 2/3 ). This characteristic renders the modulator particularly suitable for the generation of high spectral efficiency discrete multi-tone signals and we experimentally demonstrate a single-channel, direct detection transmission system operating at 49.6 Gb/s, exhibiting a baseband spectral efficiency of 5 b/s/Hz. Successful transmission is demonstrated over various lengths of single mode fibre up to 40 km, without the need of any amplification or dispersion compensation.

  20. Operating a transmission company under open access: The basic requirements

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hunt, S.; Shuttleworth, G.

    1993-03-01

    In both Europe and North America, technical and legal changes are increasing the opportunities for electricity traders to use transmission lines and grids that are owned by other companies. This article discusses the view that transmission maybe a service potentially separable from the production and retailing of electricity, and that transmission should be freely available at an appropriate price. Grid operators are wary of proposals to open access to transmission. European legislators want grid operators to become Transmission System Operators (TSO), moving energy around the network for others. Also discussed in this article are the powers that the TSO shouldmore » be allowed to exercise if access to transmission is made available.« less

  1. Energy Theft in the Advanced Metering Infrastructure

    NASA Astrophysics Data System (ADS)

    McLaughlin, Stephen; Podkuiko, Dmitry; McDaniel, Patrick

    Global energy generation and delivery systems are transitioning to a new computerized "smart grid". One of the principle components of the smart grid is an advanced metering infrastructure (AMI). AMI replaces the analog meters with computerized systems that report usage over digital communication interfaces, e.g., phone lines. However, with this infrastructure comes new risk. In this paper, we consider adversary means of defrauding the electrical grid by manipulating AMI systems. We document the methods adversaries will use to attempt to manipulate energy usage data, and validate the viability of these attacks by performing penetration testing on commodity devices. Through these activities, we demonstrate that not only is theft still possible in AMI systems, but that current AMI devices introduce a myriad of new vectors for achieving it.

  2. A systems framework for national assessment of climate risks to infrastructure.

    PubMed

    Dawson, Richard J; Thompson, David; Johns, Daniel; Wood, Ruth; Darch, Geoff; Chapman, Lee; Hughes, Paul N; Watson, Geoff V R; Paulson, Kevin; Bell, Sarah; Gosling, Simon N; Powrie, William; Hall, Jim W

    2018-06-13

    Extreme weather causes substantial adverse socio-economic impacts by damaging and disrupting the infrastructure services that underpin modern society. Globally, $2.5tn a year is spent on infrastructure which is typically designed to last decades, over which period projected changes in the climate will modify infrastructure performance. A systems approach has been developed to assess risks across all infrastructure sectors to guide national policy making and adaptation investment. The method analyses diverse evidence of climate risks and adaptation actions, to assess the urgency and extent of adaptation required. Application to the UK shows that despite recent adaptation efforts, risks to infrastructure outweigh opportunities. Flooding is the greatest risk to all infrastructure sectors: even if the Paris Agreement to limit global warming to 2°C is achieved, the number of users reliant on electricity infrastructure at risk of flooding would double, while a 4°C rise could triple UK flood damage. Other risks are significant, for example 5% and 20% of river catchments would be unable to meet water demand with 2°C and 4°C global warming respectively. Increased interdependence between infrastructure systems, especially from energy and information and communication technology (ICT), are amplifying risks, but adaptation action is limited by lack of clear responsibilities. A programme to build national capability is urgently required to improve infrastructure risk assessment.This article is part of the theme issue 'Advances in risk assessment for climate change adaptation policy'. © 2018 The Authors.

  3. A systems framework for national assessment of climate risks to infrastructure

    NASA Astrophysics Data System (ADS)

    Dawson, Richard J.; Thompson, David; Johns, Daniel; Wood, Ruth; Darch, Geoff; Chapman, Lee; Hughes, Paul N.; Watson, Geoff V. R.; Paulson, Kevin; Bell, Sarah; Gosling, Simon N.; Powrie, William; Hall, Jim W.

    2018-06-01

    Extreme weather causes substantial adverse socio-economic impacts by damaging and disrupting the infrastructure services that underpin modern society. Globally, $2.5tn a year is spent on infrastructure which is typically designed to last decades, over which period projected changes in the climate will modify infrastructure performance. A systems approach has been developed to assess risks across all infrastructure sectors to guide national policy making and adaptation investment. The method analyses diverse evidence of climate risks and adaptation actions, to assess the urgency and extent of adaptation required. Application to the UK shows that despite recent adaptation efforts, risks to infrastructure outweigh opportunities. Flooding is the greatest risk to all infrastructure sectors: even if the Paris Agreement to limit global warming to 2°C is achieved, the number of users reliant on electricity infrastructure at risk of flooding would double, while a 4°C rise could triple UK flood damage. Other risks are significant, for example 5% and 20% of river catchments would be unable to meet water demand with 2°C and 4°C global warming respectively. Increased interdependence between infrastructure systems, especially from energy and information and communication technology (ICT), are amplifying risks, but adaptation action is limited by lack of clear responsibilities. A programme to build national capability is urgently required to improve infrastructure risk assessment. This article is part of the theme issue `Advances in risk assessment for climate change adaptation policy'.

  4. A systems framework for national assessment of climate risks to infrastructure

    PubMed Central

    Thompson, David; Johns, Daniel; Darch, Geoff; Paulson, Kevin

    2018-01-01

    Extreme weather causes substantial adverse socio-economic impacts by damaging and disrupting the infrastructure services that underpin modern society. Globally, $2.5tn a year is spent on infrastructure which is typically designed to last decades, over which period projected changes in the climate will modify infrastructure performance. A systems approach has been developed to assess risks across all infrastructure sectors to guide national policy making and adaptation investment. The method analyses diverse evidence of climate risks and adaptation actions, to assess the urgency and extent of adaptation required. Application to the UK shows that despite recent adaptation efforts, risks to infrastructure outweigh opportunities. Flooding is the greatest risk to all infrastructure sectors: even if the Paris Agreement to limit global warming to 2°C is achieved, the number of users reliant on electricity infrastructure at risk of flooding would double, while a 4°C rise could triple UK flood damage. Other risks are significant, for example 5% and 20% of river catchments would be unable to meet water demand with 2°C and 4°C global warming respectively. Increased interdependence between infrastructure systems, especially from energy and information and communication technology (ICT), are amplifying risks, but adaptation action is limited by lack of clear responsibilities. A programme to build national capability is urgently required to improve infrastructure risk assessment. This article is part of the theme issue ‘Advances in risk assessment for climate change adaptation policy’. PMID:29712793

  5. Infrastructure sensing.

    PubMed

    Soga, Kenichi; Schooling, Jennifer

    2016-08-06

    Design, construction, maintenance and upgrading of civil engineering infrastructure requires fresh thinking to minimize use of materials, energy and labour. This can only be achieved by understanding the performance of the infrastructure, both during its construction and throughout its design life, through innovative monitoring. Advances in sensor systems offer intriguing possibilities to radically alter methods of condition assessment and monitoring of infrastructure. In this paper, it is hypothesized that the future of infrastructure relies on smarter information; the rich information obtained from embedded sensors within infrastructure will act as a catalyst for new design, construction, operation and maintenance processes for integrated infrastructure systems linked directly with user behaviour patterns. Some examples of emerging sensor technologies for infrastructure sensing are given. They include distributed fibre-optics sensors, computer vision, wireless sensor networks, low-power micro-electromechanical systems, energy harvesting and citizens as sensors.

  6. Electrically induced energy transmission used for implantable medical devices deep inside the body: Measurement of received voltage in consideration of biological effect.

    PubMed

    Shiba, Kenji

    2015-08-01

    We proposed an electrically induced energy transmission method for implantable medical devices deep inside the body. This method makes it possible to transmit energy deep inside the body using only a couple of titanium electrodes attached to the surface of the implantable medical device. In this study, electromagnetic simulations in which the area and distance of the receiving electrodes were changed were conducted. Then, experimental measurements of the received voltage were conducted in which electric energy was transmitted from the surface of the human phantom to an implantable device inside it (transmitting distance: 12 cm). As a result of the electromagnetic simulation, the area and distance of the receiving electrodes were roughly proportional to the received voltage, respectively. As a result of the experimental measurement, a received voltage of 2460 mV could be obtained with a load resistance of 100 Ω. We confirmed that our energy transmission method could be a powerful method for transmitting energy to a deeply implanted medical device.

  7. Robust planning of dynamic wireless charging infrastructure for battery electric buses

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Liu, Zhaocai; Song, Ziqi

    Battery electric buses with zero tailpipe emissions have great potential in improving environmental sustainability and livability of urban areas. However, the problems of high cost and limited range associated with on-board batteries have substantially limited the popularity of battery electric buses. The technology of dynamic wireless power transfer (DWPT), which provides bus operators with the ability to charge buses while in motion, may be able to effectively alleviate the drawbacks of electric buses. In this paper, we address the problem of simultaneously selecting the optimal location of the DWPT facilities and designing the optimal battery sizes of electric buses formore » a DWPT electric bus system. The problem is first constructed as a deterministic model in which the uncertainty of energy consumption and travel time of electric buses is neglected. The methodology of robust optimization (RO) is then adopted to address the uncertainty of energy consumption and travel time. The affinely adjustable robust counterpart (AARC) of the deterministic model is developed, and its equivalent tractable mathematical programming is derived. Both the deterministic model and the robust model are demonstrated with a real-world bus system. The results of our study demonstrate that the proposed deterministic model can effectively determine the allocation of DWPT facilities and the battery sizes of electric buses for a DWPT electric bus system; and the robust model can further provide optimal designs that are robust against the uncertainty of energy consumption and travel time for electric buses.« less

  8. Robust planning of dynamic wireless charging infrastructure for battery electric buses

    DOE PAGES

    Liu, Zhaocai; Song, Ziqi

    2017-10-01

    Battery electric buses with zero tailpipe emissions have great potential in improving environmental sustainability and livability of urban areas. However, the problems of high cost and limited range associated with on-board batteries have substantially limited the popularity of battery electric buses. The technology of dynamic wireless power transfer (DWPT), which provides bus operators with the ability to charge buses while in motion, may be able to effectively alleviate the drawbacks of electric buses. In this paper, we address the problem of simultaneously selecting the optimal location of the DWPT facilities and designing the optimal battery sizes of electric buses formore » a DWPT electric bus system. The problem is first constructed as a deterministic model in which the uncertainty of energy consumption and travel time of electric buses is neglected. The methodology of robust optimization (RO) is then adopted to address the uncertainty of energy consumption and travel time. The affinely adjustable robust counterpart (AARC) of the deterministic model is developed, and its equivalent tractable mathematical programming is derived. Both the deterministic model and the robust model are demonstrated with a real-world bus system. The results of our study demonstrate that the proposed deterministic model can effectively determine the allocation of DWPT facilities and the battery sizes of electric buses for a DWPT electric bus system; and the robust model can further provide optimal designs that are robust against the uncertainty of energy consumption and travel time for electric buses.« less

  9. Wing Infrastructure Development Outlook: Programmatic Environmental Assessment

    DTIC Science & Technology

    2005-07-01

    supplied by TXU Electric & Gas by two transmission lines. One transmission line feeds the eastern base area and the second line feeds the western base...destruction, loss , or degradation of wetlands and to preserve and enhance the natural and beneficial values of wetlands. 1.6.3 Public Health EO 12088...action to reduce the risk of flood loss , minimize the impact of floods on human safety, health and welfare, and to restore and preserve the natural and

  10. Powertrain system for a hybrid electric vehicle

    DOEpatents

    Reed, Jr., Richard G.; Boberg, Evan S.; Lawrie, Robert E.; Castaing, Francois J.

    1999-08-31

    A hybrid electric powertrain system is provided including an electric motor/generator drivingly engaged with the drive shaft of a transmission. The electric is utilized for synchronizing the rotation of the drive shaft with the driven shaft during gear shift operations. In addition, a mild hybrid concept is provided which utilizes a smaller electric motor than typical hybrid powertrain systems. Because the electric motor is drivingly engaged with the drive shaft of the transmission, the electric motor/generator is driven at high speed even when the vehicle speed is low so that the electric motor/generator provides more efficient regeneration.

  11. Powertrain system for a hybrid electric vehicle

    DOEpatents

    Reed, R.G. Jr.; Boberg, E.S.; Lawrie, R.E.; Castaing, F.J.

    1999-08-31

    A hybrid electric powertrain system is provided including an electric motor/generator drivingly engaged with the drive shaft of a transmission. The electric is utilized for synchronizing the rotation of the drive shaft with the driven shaft during gear shift operations. In addition, a mild hybrid concept is provided which utilizes a smaller electric motor than typical hybrid powertrain systems. Because the electric motor is drivingly engaged with the drive shaft of the transmission, the electric motor/generator is driven at high speed even when the vehicle speed is low so that the electric motor/generator provides more efficient regeneration. 34 figs.

  12. Infrastructure sensing

    PubMed Central

    Soga, Kenichi; Schooling, Jennifer

    2016-01-01

    Design, construction, maintenance and upgrading of civil engineering infrastructure requires fresh thinking to minimize use of materials, energy and labour. This can only be achieved by understanding the performance of the infrastructure, both during its construction and throughout its design life, through innovative monitoring. Advances in sensor systems offer intriguing possibilities to radically alter methods of condition assessment and monitoring of infrastructure. In this paper, it is hypothesized that the future of infrastructure relies on smarter information; the rich information obtained from embedded sensors within infrastructure will act as a catalyst for new design, construction, operation and maintenance processes for integrated infrastructure systems linked directly with user behaviour patterns. Some examples of emerging sensor technologies for infrastructure sensing are given. They include distributed fibre-optics sensors, computer vision, wireless sensor networks, low-power micro-electromechanical systems, energy harvesting and citizens as sensors. PMID:27499845

  13. Essays on empirical analysis of multi-unit auctions: Impacts of financial transmission rights on the restructured electricity industry

    NASA Astrophysics Data System (ADS)

    Zang, Hailing

    This dissertation uses recently developed empirical methodologies for the study of multi-unit auctions to test the impacts of Financial Transmission Rights (FTRs) on the competitiveness of restructured electricity markets. FTRs are a special type of financial option that hedge against volatility in the cost of transporting electricity over the grid. Policy makers seek to use the prices of FTRs as market signals to incentivize efficient investment and utilization of transmission capacity. However, prices will not send the correct signals if market participants strategically use FTRs. This dissertation uses data from the Texas electricity market to test whether the prices of FTRs are efficient to achieve such goals. The auctions studied are multi-unit, uniform-price, sealed-bid auctions. The first part of the dissertation studies the auctions on the spot market of the wholesale electricity industry. I derive structural empirical models to test theoretical predictions as to whether bidders fully internalize the effect of FTRs on profits into their bidding decisions. I find that bidders are learning as to how to optimally bid above marginal cost for their inframarginal capacities. The bidders also learn to bid to include FTRs into their profit maximization problem during the course of the first year. But starting from the second year, they deviated from optimal bidding that includes FTRs in the profit maximization problems. Counterfactual analysis show that the primary effect of FTRs on market outcomes is changing the level of prices rather than production efficiency. Finally, I find that in most months, the current allocations of FTRs are statistically equivalent to the optimal allocations. The second part of the dissertation studies the bidding behavior in the FTR auctions. I find that FTRs' strategic impact on the FTR purchasing behavior is significant for large bidders---firms exercising market power in the FTR auctions. Second, trader forecasts future FTR credit

  14. Supervisory Control and Data Acquisition (SCADA) Systems and Cyber-Security: Best Practices to Secure Critical Infrastructure

    ERIC Educational Resources Information Center

    Morsey, Christopher

    2017-01-01

    In the critical infrastructure world, many critical infrastructure sectors use a Supervisory Control and Data Acquisition (SCADA) system. The sectors that use SCADA systems are the electric power, nuclear power and water. These systems are used to control, monitor and extract data from the systems that give us all the ability to light our homes…

  15. Emissions Associated with Electric Vehicle Charging: Impact of Electricity Generation Mix, Charging Infrastructure Availability, and Vehicle Type

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McLaren, Joyce; Miller, John; O'Shaughnessy, Eric

    With the aim of reducing greenhouse gas emissions associated with the transportation sector, policy-makers are supporting a multitude of measures to increase electric vehicle adoption. The actual level of emission reduction associated with the electrification of the transport sector is dependent on the contexts that determine when and where drivers charge electric vehicles. This analysis contributes to our understanding of the degree to which a particular electricity grid profile, vehicle type, and charging patterns impact CO2 emissions from light-duty, plug-in electric vehicles. We present an analysis of emissions resulting from both battery electric and plug-in hybrid electric vehicles for fourmore » charging scenarios and five electricity grid profiles. A scenario that allows drivers to charge electric vehicles at the workplace yields the lowest level of emissions for the majority of electricity grid profiles. However, vehicle emissions are shown to be highly dependent on the percentage of fossil fuels in the grid mix, with different vehicle types and charging scenarios resulting in fewer emissions when the carbon intensity of the grid is above a defined level. Restricting charging to off-peak hours results in higher total emissions for all vehicle types, as compared to other charging scenarios.« less

  16. Renewable Electricity Futures Study. Volume 4: Bulk Electric Power Systems: Operations and Transmission Planning

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Milligan, M.; Ela, E.; Hein, J.

    2012-06-01

    The Renewable Electricity Futures (RE Futures) Study investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050. The analysis focused on the sufficiency of the geographically diverse U.S. renewable resources to meet electricity demand over future decades, the hourly operational characteristics of the U.S. grid with high levels of variable wind and solar generation, and the potential implications of deploying high levels of renewables in the future. RE Futures focused on technical aspects of high penetration of renewable electricity; it did not focus on how to achieve such a futuremore » through policy or other measures. Given the inherent uncertainties involved with analyzing alternative long-term energy futures as well as the multiple pathways that might be taken to achieve higher levels of renewable electricity supply, RE Futures explored a range of scenarios to investigate and compare the impacts of renewable electricity penetration levels (30%-90%), future technology performance improvements, potential constraints to renewable electricity development, and future electricity demand growth assumptions. RE Futures was led by the National Renewable Energy Laboratory (NREL) and the Massachusetts Institute of Technology (MIT).« less

  17. Transportation planning for electric vehicles and associated infrastructure.

    DOT National Transportation Integrated Search

    2017-05-01

    Planning is the key to successful adoption and deployment of any new technology, and : it is particularly important when that advancement involves a paradigm shift such as : electrified transportation. At its core, electric transportation is largely ...

  18. Termination for superconducting power transmission systems

    DOEpatents

    Forsyth, E.B.; Jensen, J.E.

    1975-08-26

    This patent relates to a cold, electrical gradient, terminal section for a superconducting cable for alternating current power transmission. A cold electrical gradient section filled with a gaseous coolant acting as an insulator is provided in series with a separate thermal gradient section. (auth)

  19. Security Analysis of Smart Grid Cyber Physical Infrastructures Using Modeling and Game Theoretic Simulation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Abercrombie, Robert K; Sheldon, Frederick T.

    Cyber physical computing infrastructures typically consist of a number of sites are interconnected. Its operation critically depends both on cyber components and physical components. Both types of components are subject to attacks of different kinds and frequencies, which must be accounted for the initial provisioning and subsequent operation of the infrastructure via information security analysis. Information security analysis can be performed using game theory implemented in dynamic Agent Based Game Theoretic (ABGT) simulations. Such simulations can be verified with the results from game theory analysis and further used to explore larger scale, real world scenarios involving multiple attackers, defenders, andmore » information assets. We concentrated our analysis on the electric sector failure scenarios and impact analyses by the NESCOR Working Group Study, From the Section 5 electric sector representative failure scenarios; we extracted the four generic failure scenarios and grouped them into three specific threat categories (confidentiality, integrity, and availability) to the system. These specific failure scenarios serve as a demonstration of our simulation. The analysis using our ABGT simulation demonstrates how to model the electric sector functional domain using a set of rationalized game theoretic rules decomposed from the failure scenarios in terms of how those scenarios might impact the cyber physical infrastructure network with respect to CIA.« less

  20. Low-carbon infrastructure strategies for cities

    NASA Astrophysics Data System (ADS)

    Kennedy, C. A.; Ibrahim, N.; Hoornweg, D.

    2014-05-01

    Reducing greenhouse gas emissions to avert potentially disastrous global climate change requires substantial redevelopment of infrastructure systems. Cities are recognized as key actors for leading such climate change mitigation efforts. We have studied the greenhouse gas inventories and underlying characteristics of 22 global cities. These cities differ in terms of their climates, income, levels of industrial activity, urban form and existing carbon intensity of electricity supply. Here we show how these differences in city characteristics lead to wide variations in the type of strategies that can be used for reducing emissions. Cities experiencing greater than ~1,500 heating degree days (below an 18 °C base), for example, will review building construction and retrofitting for cold climates. Electrification of infrastructure technologies is effective for cities where the carbon intensity of the grid is lower than ~600 tCO2e GWh-1 whereas transportation strategies will differ between low urban density (<~6,000 persons km-2) and high urban density (>~6,000 persons km-2) cities. As nation states negotiate targets and develop policies for reducing greenhouse gas emissions, attention to the specific characteristics of their cities will broaden and improve their suite of options. Beyond carbon pricing, markets and taxation, governments may develop policies and target spending towards low-carbon urban infrastructure.

  1. Space Weather, Geomagnetic Disturbances and Impact on the High-Voltage Transmission Systems

    NASA Technical Reports Server (NTRS)

    Pullkkinen, A.

    2011-01-01

    Geomagnetically induced currents (GIC) affecting the performance of high-voltage power transmission systems are one of the most significant hazards space weather poses on the operability of critical US infrastructure. The severity of the threat was emphasized, for example, in two recent reports: the National Research Council (NRC) report "Severe Space Weather Events--Understanding Societal and Economic Impacts: A Workshop Report" and the North American Electric Reliability Corporation (NERC) report "HighImpact, Low-Frequency Event Risk to the North American Bulk Power System." The NRC and NERC reports demonstrated the important national security dimension of space weather and GIC and called for comprehensive actions to forecast and mitigate the hazard. In this paper we will give a brief overview of space weather storms and accompanying geomagnetic storm events that lead to GIC. We will also review the fundamental principles of how GIC can impact the power transmission systems. Space weather has been a subject of great scientific advances that have changed the wonder of the past to a quantitative field of physics with true predictive power of today. NASA's Solar Shield system aimed at forecasting of GIC in the North American high-voltage power transmission system can be considered as one of the ultimate fruits of those advances. We will review the fundamental principles of the Solar Shield system and provide our view of the way forward in the science of GIC.

  2. Renewable Electricity Futures Study. Volume 4: Bulk Electric Power Systems. Operations and Transmission Planning

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Milligan, Michael; Ela, Erik; Hein, Jeff

    2012-06-15

    The Renewable Electricity Futures (RE Futures) Study investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050. The analysis focused on the sufficiency of the geographically diverse U.S. renewable resources to meet electricity demand over future decades, the hourly operational characteristics of the U.S. grid with high levels of variable wind and solar generation, and the potential implications of deploying high levels of renewables in the future. RE Futures focused on technical aspects of high penetration of renewable electricity; it did not focus on how to achieve such a futuremore » through policy or other measures. Given the inherent uncertainties involved with analyzing alternative long-term energy futures as well as the multiple pathways that might be taken to achieve higher levels of renewable electricity supply, RE Futures explored a range of scenarios to investigate and compare the impacts of renewable electricity penetration levels (30%–90%), future technology performance improvements, potential constraints to renewable electricity development, and future electricity demand growth assumptions. RE Futures was led by the National Renewable Energy Laboratory (NREL) and the Massachusetts Institute of Technology (MIT). Learn more at the RE Futures website. http://www.nrel.gov/analysis/re_futures/« less

  3. The dependence of educational infrastructure on clinical infrastructure.

    PubMed Central

    Cimino, C.

    1998-01-01

    The Albert Einstein College of Medicine needed to assess the growth of its infrastructure for educational computing as a first step to determining if student needs were being met. Included in computing infrastructure are space, equipment, software, and computing services. The infrastructure was assessed by reviewing purchasing and support logs for a six year period from 1992 to 1998. This included equipment, software, and e-mail accounts provided to students and to faculty for educational purposes. Student space has grown at a constant rate (averaging 14% increase each year respectively). Student equipment on campus has grown by a constant amount each year (average 8.3 computers each year). Student infrastructure off campus and educational support of faculty has not kept pace. It has either declined or remained level over the six year period. The availability of electronic mail clearly demonstrates this with accounts being used by 99% of students, 78% of Basic Science Course Leaders, 38% of Clerkship Directors, 18% of Clerkship Site Directors, and 8% of Clinical Elective Directors. The collection of the initial descriptive infrastructure data has revealed problems that may generalize to other medical schools. The discrepancy between infrastructure available to students and faculty on campus and students and faculty off campus creates a setting where students perceive a paradoxical declining support for computer use as they progress through medical school. While clinical infrastructure may be growing, it is at the expense of educational infrastructure at affiliate hospitals. PMID:9929262

  4. Urban underground infrastructure mapping and assessment

    NASA Astrophysics Data System (ADS)

    Huston, Dryver; Xia, Tian; Zhang, Yu; Fan, Taian; Orfeo, Dan; Razinger, Jonathan

    2017-04-01

    This paper outlines and discusses a few associated details of a smart cities approach to the mapping and condition assessment of urban underground infrastructure. Underground utilities are critical infrastructure for all modern cities. They carry drinking water, storm water, sewage, natural gas, electric power, telecommunications, steam, etc. In most cities, the underground infrastructure reflects the growth and history of the city. Many components are aging, in unknown locations with congested configurations, and in unknown condition. The technique uses sensing and information technology to determine the state of infrastructure and provide it in an appropriate, timely and secure format for managers, planners and users. The sensors include ground penetrating radar and buried sensors for persistent sensing of localized conditions. Signal processing and pattern recognition techniques convert the data in information-laden databases for use in analytics, graphical presentations, metering and planning. The presented data are from construction of the St. Paul St. CCTA Bus Station Project in Burlington, VT; utility replacement sites in Winooski, VT; and laboratory tests of smart phone position registration and magnetic signaling. The soil conditions encountered are favorable for GPR sensing and make it possible to locate buried pipes and soil layers. The present state of the art is that the data collection and processing procedures are manual and somewhat tedious, but that solutions for automating these procedures appear to be viable. Magnetic signaling with moving permanent magnets has the potential for sending lowfrequency telemetry signals through soils that are largely impenetrable by other electromagnetic waves.

  5. A Cis-Lunar Propellant Infrastructure for Flexible Path Exploration and Space Commerce

    NASA Technical Reports Server (NTRS)

    Oeftering, Richard C.

    2012-01-01

    This paper describes a space infrastructure concept that exploits lunar water for propellant production and delivers it to users in cis-lunar space. The goal is to provide responsive economical space transportation to destinations beyond low Earth orbit (LEO) and enable in-space commerce. This is a game changing concept that could fundamentally affect future space operations, provide greater access to space beyond LEO, and broaden participation in space exploration. The challenge is to minimize infrastructure development cost while achieving a low operational cost. This study discusses the evolutionary development of the infrastructure from a very modest robotic operation to one that is capable of supporting human operations. The cis-lunar infrastructure involves a mix of technologies including cryogenic propellant production, reusable lunar landers, propellant tankers, orbital transfer vehicles, aerobraking technologies, and electric propulsion. This cislunar propellant infrastructure replaces Earth-launched propellants for missions beyond LEO. It enables users to reach destinations with smaller launchers or effectively multiplies the user s existing payload capacity. Users can exploit the expanded capacity to launch logistics material that can then be traded with the infrastructure for propellants. This mutually beneficial trade between the cis-lunar infrastructure and propellant users forms the basis of in-space commerce.

  6. Modeling Hydrogen Refueling Infrastructure to Support Passenger Vehicles

    DOE PAGES

    Muratori, Matteo; Bush, Brian; Hunter, Chad; ...

    2018-05-07

    The year 2014 marked hydrogen fuel cell electric vehicles (FCEVs) first becoming commercially available in California, where significant investments are being made to promote the adoption of alternative transportation fuels. A refueling infrastructure network that guarantees adequate coverage and expands in line with vehicle sales is required for FCEVs to be successfully adopted by private customers. In this article, we provide an overview of modelling methodologies used to project hydrogen refueling infrastructure requirements to support FCEV adoption, and we describe, in detail, the National Renewable Energy Laboratory's scenario evaluation and regionalization analysis (SERA) model. As an example, we use SERAmore » to explore two alternative scenarios of FCEV adoption: one in which FCEV deployment is limited to California and several major cities in the United States; and one in which FCEVs reach widespread adoption, becoming a major option as passenger vehicles across the entire country. Such scenarios can provide guidance and insights for efforts required to deploy the infrastructure supporting transition toward different levels of hydrogen use as a transportation fuel for passenger vehicles in the United States.« less

  7. Modeling Hydrogen Refueling Infrastructure to Support Passenger Vehicles

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Muratori, Matteo; Bush, Brian; Hunter, Chad

    The year 2014 marked hydrogen fuel cell electric vehicles (FCEVs) first becoming commercially available in California, where significant investments are being made to promote the adoption of alternative transportation fuels. A refueling infrastructure network that guarantees adequate coverage and expands in line with vehicle sales is required for FCEVs to be successfully adopted by private customers. In this article, we provide an overview of modelling methodologies used to project hydrogen refueling infrastructure requirements to support FCEV adoption, and we describe, in detail, the National Renewable Energy Laboratory's scenario evaluation and regionalization analysis (SERA) model. As an example, we use SERAmore » to explore two alternative scenarios of FCEV adoption: one in which FCEV deployment is limited to California and several major cities in the United States; and one in which FCEVs reach widespread adoption, becoming a major option as passenger vehicles across the entire country. Such scenarios can provide guidance and insights for efforts required to deploy the infrastructure supporting transition toward different levels of hydrogen use as a transportation fuel for passenger vehicles in the United States.« less

  8. North-south polarization of European electricity consumption under future warming.

    PubMed

    Wenz, Leonie; Levermann, Anders; Auffhammer, Maximilian

    2017-09-19

    There is growing empirical evidence that anthropogenic climate change will substantially affect the electric sector. Impacts will stem both from the supply side-through the mitigation of greenhouse gases-and from the demand side-through adaptive responses to a changing environment. Here we provide evidence of a polarization of both peak load and overall electricity consumption under future warming for the world's third-largest electricity market-the 35 countries of Europe. We statistically estimate country-level dose-response functions between daily peak/total electricity load and ambient temperature for the period 2006-2012. After removing the impact of nontemperature confounders and normalizing the residual load data for each country, we estimate a common dose-response function, which we use to compute national electricity loads for temperatures that lie outside each country's currently observed temperature range. To this end, we impose end-of-century climate on today's European economies following three different greenhouse-gas concentration trajectories, ranging from ambitious climate-change mitigation-in line with the Paris agreement-to unabated climate change. We find significant increases in average daily peak load and overall electricity consumption in southern and western Europe (∼3 to ∼7% for Portugal and Spain) and significant decreases in northern Europe (∼-6 to ∼-2% for Sweden and Norway). While the projected effect on European total consumption is nearly zero, the significant polarization and seasonal shifts in peak demand and consumption have important ramifications for the location of costly peak-generating capacity, transmission infrastructure, and the design of energy-efficiency policy and storage capacity.

  9. Proliferation risks from nuclear power infrastructure

    NASA Astrophysics Data System (ADS)

    Squassoni, Sharon

    2017-11-01

    Certain elements of nuclear energy infrastructure are inherently dual-use, which makes the promotion of nuclear energy fraught with uncertainty. Are current restraints on the materials, equipment, and technology that can be used either to produce fuel for nuclear electricity generation or material for nuclear explosive devices adequate? Technology controls, supply side restrictions, and fuel market assurances have been used to dissuade countries from developing sensitive technologies but the lack of legal restrictions is a continued barrier to permanent reduction of nuclear proliferation risks.

  10. A modeling framework for investment planning in interdependent infrastructures in multi-hazard environments.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brown, Nathanael J. K.; Gearhart, Jared Lee; Jones, Dean A.

    Currently, much of protection planning is conducted separately for each infrastructure and hazard. Limited funding requires a balance of expenditures between terrorism and natural hazards based on potential impacts. This report documents the results of a Laboratory Directed Research & Development (LDRD) project that created a modeling framework for investment planning in interdependent infrastructures focused on multiple hazards, including terrorism. To develop this framework, three modeling elements were integrated: natural hazards, terrorism, and interdependent infrastructures. For natural hazards, a methodology was created for specifying events consistent with regional hazards. For terrorism, we modeled the terrorists actions based on assumptions regardingmore » their knowledge, goals, and target identification strategy. For infrastructures, we focused on predicting post-event performance due to specific terrorist attacks and natural hazard events, tempered by appropriate infrastructure investments. We demonstrate the utility of this framework with various examples, including protection of electric power, roadway, and hospital networks.« less

  11. 77 FR 30522 - Midwest Independent Transmission System Operator, Inc.; ALLETE, Inc.; Ameren Illinois Company...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL12-35-000] Midwest Independent Transmission System Operator, Inc.; ALLETE, Inc.; Ameren Illinois Company; Ameren Transmission Company of Illinois; American Transmission Company, LLC; Big Rivers Electric Corporation; Board of Water, Electric and Communications Trustees of the...

  12. Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Woodford, D.

    This report provides an independent review included an initial evaluation of the technical configuration and capital costs of establishing an undersea cable system and examining impacts to the existing electric transmission systems as a result of interconnecting the islands.

  13. Hydrogen Fuel Cell Electric Vehicle Learning Demonstration | Hydrogen and

    Science.gov Websites

    Fuel Cells | NREL Fuel Cell Electric Vehicle Learning Demonstration Hydrogen Fuel Cell Electric Vehicle Learning Demonstration Initiated in 2004, DOE's Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project-later dubbed the Fuel Cell Electric Vehicle (FCEV) Learning Demonstration

  14. Material Challenges and Opportunities for Commercial Electric Aircraft

    NASA Technical Reports Server (NTRS)

    Misra, Ajay

    2014-01-01

    Significant reduction in carbon dioxide emission for future air transportation system will require adoption of electric propulsion system and more electric architectures. Various options for aircraft electric propulsion include hybrid electric, turboelectric, and full electric system. Realization of electric propulsion system for commercial aircraft applications will require significant increases in power density of electric motors and energy density of energy storage system, such as the batteries and fuel cells. In addition, transmission of MW of power in the aircraft will require high voltage power transmission system to reduce the weight of the power transmission system. Finally, there will be significant thermal management challenges. Significant advances in material technologies will be required to meet these challenges. Technologies of interest include materials with higher electrical conductivity than Cu, high thermal conductivity materials, and lightweight electrically insulating materials with high breakdown voltage, high temperature magnets, advanced battery and fuel cell materials, and multifunctional materials. The presentation will include various challenges for commercial electric aircraft and provide an overview of material improvements that will be required to meet these challenges.

  15. Battery Electric Vehicle Driving and Charging Behavior Observed Early in The EV Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    John Smart; Stephen Schey

    2012-04-01

    As concern about society's dependence on petroleum-based transportation fuels increases, many see plug-in electric vehicles (PEV) as enablers to diversifying transportation energy sources. These vehicles, which include plug-in hybrid electric vehicles (PHEV), range-extended electric vehicles (EREV), and battery electric vehicles (BEV), draw some or all of their power from electricity stored in batteries, which are charged by the electric grid. In order for PEVs to be accepted by the mass market, electric charging infrastructure must also be deployed. Charging infrastructure must be safe, convenient, and financially sustainable. Additionally, electric utilities must be able to manage PEV charging demand on themore » electric grid. In the Fall of 2009, a large scale PEV infrastructure demonstration was launched to deploy an unprecedented number of PEVs and charging infrastructure. This demonstration, called The EV Project, is led by Electric Transportation Engineering Corporation (eTec) and funded by the U.S. Department of Energy. eTec is partnering with Nissan North America to deploy up to 4,700 Nissan Leaf BEVs and 11,210 charging units in five market areas in Arizona, California, Oregon, Tennessee, and Washington. With the assistance of the Idaho National Laboratory, eTec will collect and analyze data to characterize vehicle consumer driving and charging behavior, evaluate the effectiveness of charging infrastructure, and understand the impact of PEV charging on the electric grid. Trials of various revenue systems for commercial and public charging infrastructure will also be conducted. The ultimate goal of The EV Project is to capture lessons learned to enable the mass deployment of PEVs. This paper is the first in a series of papers documenting the progress and findings of The EV Project. This paper describes key research objectives of The EV Project and establishes the project background, including lessons learned from previous infrastructure deployment and

  16. Modeling water resources as a constraint in electricity capacity expansion models

    NASA Astrophysics Data System (ADS)

    Newmark, R. L.; Macknick, J.; Cohen, S.; Tidwell, V. C.; Woldeyesus, T.; Martinez, A.

    2013-12-01

    and availability of freshwater (surface and groundwater) and alternative water resources (municipal wastewater and brackish groundwater). In each region, a new power plant must secure sufficient water rights for operation before being built. Water rights constraints thus influence the type of power plant, cooling system, or location of new generating capacity. Results indicate that the aggregate national generating capacity by fuel type and associated carbon dioxide emissions change marginally with the inclusion of water rights. Water resource withdrawals and consumption, however, can vary considerably. Regional water resource dynamics indicate substantial differences in the location where power plant-cooling system technology combinations are built. These localized impacts highlight the importance of considering water resources as a constraint in the electricity sector when evaluating costs, transmission infrastructure needs, and externalities. Further scenario evaluations include assessments of how climate change could affect the availability of water resources, and thus the development of the electricity sector.

  17. 18 CFR 2.21 - Regional Transmission Groups.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Groups. 2.21 Section 2.21 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION... Interpretations Under the Federal Power Act § 2.21 Regional Transmission Groups. (a) General policy. The Commission encourages Regional Transmission Groups (RTGs) as a means of enabling the market for electric...

  18. Electricity Delivery and its Environmental Impacts

    EPA Pesticide Factsheets

    Explains electricity delivery in the U.S. and its impacts on the environment. After a centralized power plant generates electricity, the electricity must be delivered to the end-user. Follow the path of electricity through transmission, substation, and dis

  19. Compounded effects of heat waves and droughts over the Western Electricity Grid: spatio-temporal scales of impacts and predictability toward mitigation and adaptation.

    NASA Astrophysics Data System (ADS)

    Voisin, N.; Kintner-Meyer, M.; Skaggs, R.; Xie, Y.; Wu, D.; Nguyen, T. B.; Fu, T.; Zhou, T.

    2016-12-01

    Heat waves and droughts are projected to be more frequent and intense. We have seen in the past the effects of each of those extreme climate events on electricity demand and constrained electricity generation, challenging power system operations. Our aim here is to understand the compounding effects under historical conditions. We present a benchmark of Western US grid performance under 55 years of historical climate, and including droughts, using 2010-level of water demand and water management infrastructure, and 2010-level of electricity grid infrastructure and operations. We leverage CMIP5 historical hydrology simulations and force a large scale river routing- reservoir model with 2010-level sectoral water demands. The regulated flow at each water-dependent generating plants is processed to adjust water-dependent electricity generation parameterization in a production cost model, that represents 2010-level power system operations with hourly energy demand of 2010. The resulting benchmark includes a risk distribution of several grid performance metrics (unserved energy, production cost, carbon emission) as a function of inter-annual variability in regional water availability and predictability using large scale climate oscillations. In the second part of the presentation, we describe an approach to map historical heat waves onto this benchmark grid performance using a building energy demand model. The impact of the heat waves, combined with the impact of droughts, is explored at multiple scales to understand the compounding effects. Vulnerabilities of the power generation and transmission systems are highlighted to guide future adaptation.

  20. The role of spinal cord transmission in the ventilatory response to electrically induced exercise in the anaesthetized dog

    PubMed Central

    Cross, Brenda A.; Davey, A.; Guz, A.; Katona, P. G.; Maclean, M.; Murphy, K.; Semple, S. J. G.; Stidwill, R.

    1982-01-01

    1. The ventilatory response to electrically induced `exercise' was studied in six chloralose-anaesthetized dogs. The on-transient and steady-state responses to `exercise' were compared in the same dogs before and after spinal cord transection at T8/9 (dermatome level T6/7) on fifteen occasions. 2. Phasic hind limb `exercise' was induced for periods of 4 min by passing current (2 Hz modulated 50 Hz sine wave) between two needles inserted through the hamstring muscles. The maximum current used was 30 mA. This was below the level previously found to produce an artifactual stimulation of breathing with the cord intact. 3. Cord transection produced no significant change in either the resting values of ventilation (˙VI) and CO2 production (˙VCO2) or the ventilatory equivalent for CO2 during `exercise' (△ ˙VI/ △ ˙VCO2). 4. During the steady state of exercise Pa, CO2 was on average significantly lower than at rest with the cord intact (mean △Pa, CO2, - 2·1 mmHg; range - 5·7 to + 1), and higher, though not significantly, with the cord cut (mean Pa, CO2, + 1·2 mmHg; range - 1·5 to + 4·3). However, even in the absence of spinal cord transmission, the ventilatory response to exercise could not be accounted for on the basis of CO2 sensitivity; the △ ˙VI/ △Pa,CO2 obtained with exercise (apparent sensitivity) was significantly greater than that obtained with CO2 inhalation (true sensitivity) both before and after cord section. 5. ˙VI and ˙VCO2 increased more slowly with the cord cut than with the cord intact. This was thought to be due to a slower increase in venous return in the absence of sympathetic innervation of the lower half of the body following cord transection. 6. Similar experiments were performed during muscle paralysis (following gallamine triethiodide). Ventilation was maintained with a respirator controlled by phrenic nerve activity. These experiments showed an increase in ventilation, independent of muscle contraction, which was only present

  1. Transportation Energy Futures Series: Alternative Fuel Infrastructure Expansion: Costs, Resources, Production Capacity, and Retail Availability for Low-Carbon Scenarios

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Melaina, M. W.; Heath, G.; Sandor, D.

    2013-04-01

    Achieving the Department of Energy target of an 80% reduction in greenhouse gas emissions by 2050 depends on transportation-related strategies combining technology innovation, market adoption, and changes in consumer behavior. This study examines expanding low-carbon transportation fuel infrastructure to achieve deep GHG emissions reductions, with an emphasis on fuel production facilities and retail components serving light-duty vehicles. Three distinct low-carbon fuel supply scenarios are examined: Portfolio: Successful deployment of a range of advanced vehicle and fuel technologies; Combustion: Market dominance by hybridized internal combustion engine vehicles fueled by advanced biofuels and natural gas; Electrification: Market dominance by electric drive vehiclesmore » in the LDV sector, including battery electric, plug-in hybrid, and fuel cell vehicles, that are fueled by low-carbon electricity and hydrogen. A range of possible low-carbon fuel demand outcomes are explored in terms of the scale and scope of infrastructure expansion requirements and evaluated based on fuel costs, energy resource utilization, fuel production infrastructure expansion, and retail infrastructure expansion for LDVs. This is one of a series of reports produced as a result of the Transportation Energy Futures (TEF) project, a Department of Energy-sponsored multi-agency project initiated to pinpoint underexplored transportation-related strategies for abating GHGs and reducing petroleum dependence.« less

  2. Polish Geophysical Solid Earth Infrastructure Contributing to EPOS

    NASA Astrophysics Data System (ADS)

    Debski, W.; Mutke, G.; Suchcicki, J.; Jozwiak, W.; Wiejacz, P.; Trojanowski, J.

    2012-04-01

    In this poster we present the current state of the main polish solid-earth-orientated infrastructures and shortly described history of their development, current state, and some plans for their future development. The presen- tation concentrates only on the classical infrastructure leaving aside for the while the the geodetic-orientated infrastructure, like GPS network and the GPS processing data centers, gravimetric infrastructure and others of this type. Polish broadband seismic infrastructure consists of 7 permanent broadband stations incorporated into the VEBSN initiative running at the polish territory and one operated in collaboration with NORSAR is settled at the Hornsund (Svalbard) polish polar station. All stations are equipped with STS-2 seismometers and polish MK-6 seismic stations providing 120 dB dynamics 100Hz sampling and data transmission in a real time to processing center. Besides this permanent broadband seismic network (PLSN) the Central Institute of Mining is running the permanent regional, short period network at the Upper Silesia area dedicated to the detailed monitoring of seismicity induced by the black coal mining activity in this area. The network consists of As the mining activity is the main source of seismicity in Poland also all mines are running underground short period networks, like for example Rudna-Polkowice copper mine seismic network consisting of 64 underground located short period seimometers. In that area, especially around the Zelazny Most: the huge post-floating artificial lake the, IGF PAS is running the local seismic array consisting of 4 short period seismometers. Besides these permanent network IGF PAN is running the portable seismic network for detailed mapping a possible natural seismic activity in selected regions of Poland. Important contribution to classical geophysical observation in the electro-magnetic field are provided by three permanent geomagnetic observatories (one at Hornsund) and supporting set of 10

  3. Transmission Reinforcements in the Central American Regional Power System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Elizondo, Marcelo A.; Vallem, Mallikarjuna R.; Samaan, Nader A.

    The Central American regional interconnected power system (SER) connects the countries members of the Central American regional electricity market (MER): Guatemala, El Salvador, Honduras, Nicaragua, Costa Rica, and Panama. The SER was a result of a long term regional effort, and was initially conceived to transfer 300 MW between countries. However, the current transfer limits between countries range from 70 MW to 300 MW. Regional entities, like CRIE (Regional Commission of Electrical Interconnection), EOR (Central American Regional System Operator), and CDMER (Board of Directors of the Central American Market) are working on coordinating the national transmission expansion plans with regionalmore » transmission planning efforts. This paper presents experience in Central America region to recommend transmission reinforcements to achieve 300 MW transfer capacity between any pair of member countries of the Central American regional electricity market (MER). This paper also provides a methodology for technical analysis and for coordination among the regional and national entities. This methodology is unique for transmission systems of these characteristics.« less

  4. Electricity Market Module - NEMS Documentation

    EIA Publications

    2017-01-01

    Documents the Electricity Market Module as it was used for the Annual Energy Outlook. The Electricity Market Module (EMM) is the electricity supply component of the National Energy Modeling System (NEMS). The EMM represents the generation, transmission, and pricing of electricity. It consists of four submodules: the Electricity Capacity Planning (ECP) Submodule, the Electricity Fuel Dispatch (EFD) Submodule, the Electricity Finance and Pricing (EFP) Submodule, and the Electricity Load and Demand (ELD) Submodule.

  5. Effects of electric current on individual graphene oxide sheets combining in situ transmission electron microscopy and Raman spectroscopy

    NASA Astrophysics Data System (ADS)

    Martín, Gemma; Varea, Aïda; Cirera, Albert; Estradé, Sònia; Peiró, Francesca; Cornet, Albert

    2018-07-01

    Graphene oxide (GO) is currently the object of extensive research because of its potential use in mass production of graphene-based materials, but also due to its tunability which holds great promise for new nanoscale electronic devices and sensors. To obtain a better understanding of the role of GO in electronic nano-devices, the elucidation of the effects of electrical current on a single GO sheet is of great interest. In this work, in situ transmission electron microscopy is used to study the effects of the electrical current flow through single GO sheets using an scanning tunneling microscope holder. In order to correlate the applied current with the structural properties of GO, Raman spectroscopy is carried out and data analysis is used to obtain information regarding the reduction grade and the disorder degree of the GO sheets before and after the application of current.

  6. Effects of electric current on individual graphene oxide sheets combining in situ transmission electron microscopy and Raman spectroscopy.

    PubMed

    Martín, Gemma; Varea, Aïda; Cirera, Albert; Estradé, Sònia; Peiró, Francesca; Cornet, Albert

    2018-04-17

    Graphene oxide (GO) is currently the object of extensive research because of its potential use in mass production of graphene-based materials, but also due to its tunability which holds great promise for new nanoscale electronic devices and sensors. To obtain a better understanding of the role of GO in electronic nano-devices, the elucidation of the effects of electrical current on a single GO sheet is of great interest. In this work, in situ transmission electron microscopy is used to study the effects of the electrical current flow through single GO sheets using an scanning tunneling microscope holder. In order to correlate the applied current with the structural properties of GO, Raman spectroscopy is carried out and data analysis is used to obtain information regarding the reduction grade and the disorder degree of the GO sheets before and after the application of current.

  7. Immunotherapies to prevent mother-to-child transmission of HIV.

    PubMed

    Hicar, Mark D

    2013-03-01

    Although pharmacological interventions have been successful in reducing prevention of maternal to child transmission (PMTCT) of HIV, there is concern that complete elimination through this mode of transmission will require other measures. Immunotherapies in infants or pregnant mothers may be able to eradicate this form of transmission. A recent vaccine trial in adults showed encouraging results, but as in most HIV safety and efficacy vaccine trials, the question of MTCT was not addressed. Concentrating transmission studies and vaccine studies in the setting of MTCT offers several advantages. MTCT has a generally reproducible known transmission rate and has been successfully used to assess pharmacological interventions on decreasing transmission. Even in resource poor settings, the infrastructure for neonatal vaccination is already in place. Although rare, both passive and active vaccination trials have been successfully completed in pediatric populations. Unfortunately, little success in affecting MTCT has been shown. Largely, a correlate of protection in any type of transmission, including MTCT, is unknown. Data supports a role for antibodies in effecting strain and transmission during MTCT. The role of antibodies in MTCT is reviewed with a focus on recent passive immunization and considerations for future studies.

  8. North–south polarization of European electricity consumption under future warming

    PubMed Central

    Wenz, Leonie; Levermann, Anders; Auffhammer, Maximilian

    2017-01-01

    There is growing empirical evidence that anthropogenic climate change will substantially affect the electric sector. Impacts will stem both from the supply side—through the mitigation of greenhouse gases—and from the demand side—through adaptive responses to a changing environment. Here we provide evidence of a polarization of both peak load and overall electricity consumption under future warming for the world’s third-largest electricity market—the 35 countries of Europe. We statistically estimate country-level dose–response functions between daily peak/total electricity load and ambient temperature for the period 2006–2012. After removing the impact of nontemperature confounders and normalizing the residual load data for each country, we estimate a common dose–response function, which we use to compute national electricity loads for temperatures that lie outside each country’s currently observed temperature range. To this end, we impose end-of-century climate on today’s European economies following three different greenhouse-gas concentration trajectories, ranging from ambitious climate-change mitigation—in line with the Paris agreement—to unabated climate change. We find significant increases in average daily peak load and overall electricity consumption in southern and western Europe (∼3 to ∼7% for Portugal and Spain) and significant decreases in northern Europe (∼−6 to ∼−2% for Sweden and Norway). While the projected effect on European total consumption is nearly zero, the significant polarization and seasonal shifts in peak demand and consumption have important ramifications for the location of costly peak-generating capacity, transmission infrastructure, and the design of energy-efficiency policy and storage capacity. PMID:28847939

  9. First clinical trial of the "MiRo" capsule endoscope by using a novel transmission technology: electric-field propagation.

    PubMed

    Bang, Seungmin; Park, Jeong Youp; Jeong, Seok; Kim, Young Ho; Shim, Han Bo; Kim, Tae Song; Lee, Don Haeng; Song, Si Young

    2009-02-01

    We developed a capsule endoscope (CE), "MiRo," with the novel transmission technology of electric-field propagation. The technology uses the human body as a conductive medium for data transmission. Specifications of the prototype include the ability to receive real-time images; size, 10.8 x 24 mm; weight, 3.3 g; field of view, 150 degrees; resolution of power, 320 x 320 pixels; and transmittal speed, 2 frames per second. To evaluate the clinical safety and diagnostic feasibility of the prototype MiRo, we conducted a multicenter clinical trial. All volunteers underwent baseline examinations, including EGD and electrocardiography for the screening of GI obstructive and cardiovascular diseases, before the trial. In the first 10 cases, 24-hour Holter monitoring was also performed. To evaluate the diagnostic feasibility, transmission rate of the captured images, inspection rate of the entire small bowel, and quality of transmitted images (graded as outstanding, excellent, good/average, below average, and poor) were analyzed. Of the 49 healthy volunteers, 45 were included in the trial, and 4 were excluded because of baseline abnormalities. No adverse effects were noted. All CEs were expelled within 2 days, and the entire small bowel could be explored in all cases. The transmission rates of the captured image in the stomach, small bowel, and colon were 99.5%, 99.6%, and 97.2%, respectively. The mean total duration of image transmission was 9 hours, 51 minutes, and the mean transit time of the entire small bowel was 4 hours, 33 minutes. Image quality was graded as good or better in 41 cases (91.1%). Details of the villi and vascular structures of the entire small bowel were clearly visualized in 31 cases (68.9%). MiRo is safe and effective for exploring the entire small bowel, with good image quality and real-time feasibility. This novel transmission technology may have applications beyond the field of capsule endoscopy.

  10. Electricity in Oman

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dawood, A.A.

    1994-12-01

    This presentation examines the development of the power generation and transmission capacity of the power system of Oman. The topics of the presentation include economic development of Oman; growth of the electricity sector including capacity generation, transmission and distribution and load characteristics; involvement of the private sector; power interconnections and exchanges; privatization; and training.

  11. Infrastructure for deployment of power systems

    NASA Technical Reports Server (NTRS)

    Sprouse, Kenneth M.

    1991-01-01

    A preliminary effort in characterizing the types of stationary lunar power systems which may be considered for emplacement on the lunar surface from the proposed initial 100-kW unit in 2003 to later units ranging in power from 25 to 825 kW is presented. Associated with these power systems are their related infrastructure hardware including: (1) electrical cable, wiring, switchgear, and converters; (2) deployable radiator panels; (3) deployable photovoltaic (PV) panels; (4) heat transfer fluid piping and connection joints; (5) power system instrumentation and control equipment; and (6) interface hardware between lunar surface construction/maintenance equipment and power system. This report: (1) presents estimates of the mass and volumes associated with these power systems and their related infrastructure hardware; (2) provides task breakdown description for emplacing this equipment; (3) gives estimated heat, forces, torques, and alignment tolerances for equipment assembly; and (4) provides other important equipment/machinery requirements where applicable. Packaging options for this equipment will be discussed along with necessary site preparation requirements. Design and analysis issues associated with the final emplacement of this power system hardware are also described.

  12. Transportation and dynamic networks: Models, theory, and applications to supply chains, electric power, and financial networks

    NASA Astrophysics Data System (ADS)

    Liu, Zugang

    Network systems, including transportation and logistic systems, electric power generation and distribution networks as well as financial networks, provide the critical infrastructure for the functioning of our societies and economies. The understanding of the dynamic behavior of such systems is also crucial to national security and prosperity. The identification of new connections between distinct network systems is the inspiration for the research in this dissertation. In particular, I answer two questions raised by Beckmann, McGuire, and Winsten (1956) and Copeland (1952) over half a century ago, which are, respectively, how are electric power flows related to transportation flows and does money flow like water or electricity? In addition, in this dissertation, I achieve the following: (1) I establish the relationships between transportation networks and three other classes of complex network systems: supply chain networks, electric power generation and transmission networks, and financial networks with intermediation. The establishment of such connections provides novel theoretical insights as well as new pricing mechanisms, and efficient computational methods. (2) I develop new modeling frameworks based on evolutionary variational inequality theory that capture the dynamics of such network systems in terms of the time-varying flows and incurred costs, prices, and, where applicable, profits. This dissertation studies the dynamics of such network systems by addressing both internal competition and/or cooperation, and external changes, such as varying costs and demands. (3) I focus, in depth, on electric power supply chains. By exploiting the relationships between transportation networks and electric power supply chains, I develop a large-scale network model that integrates electric power supply chains and fuel supply markets. The model captures both the economic transactions as well as the physical transmission constraints. The model is then applied to the New

  13. Concept of intellectual charging system for electrical and plug-in hybrid vehicles in Russian Federation

    NASA Astrophysics Data System (ADS)

    Kolbasov, A.; Karpukhin, K.; Terenchenko, A.; Kavalchuk, I.

    2018-02-01

    Electric vehicles have become the most common solution to improve sustainability of the transportation systems all around the world. Despite all benefits, wide adaptation of electric vehicles requires major changes in the infrastructure, including grid adaptation to the rapidly increased power demand and development of the Connected Car concept. This paper discusses the approaches to improve usability of electric vehicles, by creating suitable web-services, with possible connections vehicle-to-vehicle, vehicle-to-infrastructure, and vehicle-to-grid. Developed concept combines information about electrical loads on the grid in specific direction, navigation information from the on-board system, existing and empty charging slots and power availability. In addition, this paper presents the universal concept of the photovoltaic integrated charging stations, which are connected to the developed information systems. It helps to achieve rapid adaptation of the overall infrastructure to the needs of the electric vehicles users with minor changes in the existing grid and loads.

  14. Autonomous data transmission apparatus

    DOEpatents

    Kotlyar, Oleg M.

    1997-01-01

    A autonomous borehole data transmission apparatus for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters.

  15. US cities can manage national hydrology and biodiversity using local infrastructure policy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McManamay, Ryan A.; Surendran Nair, Sujithkumar; DeRolph, Christopher R.

    Cities are concentrations of socio-political power and prime architects of land transformation, while also serving as consumption hubs of “hard” water and energy infrastructures (e.g. electrical power, stormwater management, zoning, water supply, and wastewater). These infrastructures extend well outside metropolitan boundaries and impact distal river ecosystems. We used a comprehensive model to quantify the roles of anthropogenic stressors on hydrologic alteration and biodiversity in US streams and isolated the impacts stemming from hard infrastructure developments in cities. Across the conterminous US, cities’ hard infrastructures have significantly altered at least 7% of streams, which influence habitats for over 60% of Northmore » America’s fish, mussel, and crayfish species. Additionally, city infrastructures have contributed to local extinctions in 260 species and currently influence 970 indigenous species, 27% of which are in jeopardy. We find that ecosystem impacts do not scale with city size but are instead proportionate to infrastructure decisions. For example, Atlanta’s impacts by hard infrastructures extend across four major river basins, 12,500 stream km, and contribute to 100 local extinctions of aquatic species. In contrast, Las Vegas, a similar size city, impacts < 1000 stream km, leading to only 7 local extinctions. So, cities have local policy choices that can reduce future impacts to regional aquatic ecosystems as cities grow. Furthermore, by coordinating policy and communication between hard infrastructure sectors, local city governments and utilities can directly improve environmental quality in a significant fraction of the nation’s streams and aquatic biota reaching far beyond their city boundaries.« less

  16. US cities can manage national hydrology and biodiversity using local infrastructure policy

    DOE PAGES

    McManamay, Ryan A.; Surendran Nair, Sujithkumar; DeRolph, Christopher R.; ...

    2017-08-21

    Cities are concentrations of socio-political power and prime architects of land transformation, while also serving as consumption hubs of “hard” water and energy infrastructures (e.g. electrical power, stormwater management, zoning, water supply, and wastewater). These infrastructures extend well outside metropolitan boundaries and impact distal river ecosystems. We used a comprehensive model to quantify the roles of anthropogenic stressors on hydrologic alteration and biodiversity in US streams and isolated the impacts stemming from hard infrastructure developments in cities. Across the conterminous US, cities’ hard infrastructures have significantly altered at least 7% of streams, which influence habitats for over 60% of Northmore » America’s fish, mussel, and crayfish species. Additionally, city infrastructures have contributed to local extinctions in 260 species and currently influence 970 indigenous species, 27% of which are in jeopardy. We find that ecosystem impacts do not scale with city size but are instead proportionate to infrastructure decisions. For example, Atlanta’s impacts by hard infrastructures extend across four major river basins, 12,500 stream km, and contribute to 100 local extinctions of aquatic species. In contrast, Las Vegas, a similar size city, impacts < 1000 stream km, leading to only 7 local extinctions. So, cities have local policy choices that can reduce future impacts to regional aquatic ecosystems as cities grow. Furthermore, by coordinating policy and communication between hard infrastructure sectors, local city governments and utilities can directly improve environmental quality in a significant fraction of the nation’s streams and aquatic biota reaching far beyond their city boundaries.« less

  17. The Broadband Imperative: Recommendations to Address K-12 Education Infrastructure Needs

    ERIC Educational Resources Information Center

    Fox, Christine; Waters, John; Fletcher, Geoff; Levin, Douglas

    2012-01-01

    It is a simple fact that access to high-speed broadband is now as vital a component of K-12 school infrastructure as electricity, air conditioning, and heating. The same tools and resources that have transformed educators' personal, civic, and professional lives must be part of learning experiences intended to prepare today's students for college…

  18. Autonomous Inspection of Electrical Transmission Structures with Airborne UV Sensors - NASA Report on Dominion Virginia Power Flights of November 2016

    NASA Technical Reports Server (NTRS)

    Moore, Andrew J.; Schubert, Matthew; Nicholas Rymer

    2017-01-01

    The report details test and measurement flights to demonstrate autonomous UAV inspection of high voltage electrical transmission structures. A UAV built with commercial, off-the-shelf hardware and software, supplemented with custom sensor logging software, measured ultraviolet emissions from a test generator placed on a low-altitude substation and a medium-altitude switching tower. Since corona discharge precedes catastrophic electrical faults on high-voltage structures, detection and geolocation of ultraviolet emissions is needed to develop a UAV-based self-diagnosing power grid. Signal readings from an onboard ultraviolet sensor were validated during flight with a commercial corona camera. Geolocation was accomplished with onboard GPS; the UAV position was logged to a local ground station and transmitted in real time to a NASA server for tracking in the national airspace.

  19. Common Criteria for Information Technology Security Evaluation: Department of Defense Public Key Infrastructure and Key Management Infrastructure Token Protection Profile (Medium Robustness)

    DTIC Science & Technology

    2002-03-22

    may be derived from detailed inspection of the IC itself or from illicit appropriation of design information. Counterfeit smart cards can be mass...Infrastructure (PKI) as the Internet to securely and privately exchange data and money through the use of a public and a private cryptographic key pair...interference devices (SQDIS), electrical testing, and electron beam testing. • Other attacks, such as UV or X-rays or high temperatures, could cause erasure

  20. Real-time dual-polarization transmission based on hybrid optical wireless communications

    NASA Astrophysics Data System (ADS)

    Sousa, Artur N.; Alimi, Isiaka A.; Ferreira, Ricardo M.; Shahpari, Ali; Lima, Mário; Monteiro, Paulo P.; Teixeira, António L.

    2018-01-01

    We present experimental work on a gigabit-capable and long-reach hybrid coherent UWDM-PON plus FSO system for supporting different applications over the same fiber infrastructure in the mobile backhaul (MBH) networks. Also, for the first time, we demonstrate a reconfigurable real-time DSP transmission/reception of DP-QPSK signals over standard single-mode fiber (SSMF) and FSO links. The receiver presented is based on a commercial field-programmable gate array (FPGA). The considered communication links are based on 20 UDWDM channels with 625 Mbaud and 2.5 GHz channel spacing. We are able to demonstrate the lowest sampling rate required for digital coherent PON by employing four 1.25 Gsa/s ADCs using an electrical front-end receiver that offers only 1 GHz analog bandwidth. We achieved this by implementing a phase and polarization diversity coherent receiver combined with the DP-QPSK modulation formats. The system performance is estimated in terms of receiver sensitivity. The results show the viability of coherent PON and flexible dual-polarization supported by software-defined transceivers for the MBH.

  1. Transmission rights and market power

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bushnell, J.

    1999-10-01

    Most of the concerns about physical transmission rights relate to the ability to implicitly or explicitly remove that transmission capacity from the market-place. Under a very strict form of physical right, owners could simply choose not to sell it if they don't want to use it. Modifications that require the release of spare capacity back into an open market could potentially alleviate this problem but there is concern that such releases would not occur far enough in advance to be of much use to schedulers. Similarly, the transmission capacity that is made available for use by non-rights holders can alsomore » be manipulated by the owners of transmission rights. The alternative form, financial transmission rights, provide to their owners congestion payments, but physical control of transmission paths. In electricity markets such as California's, even financial transmission rights could potentially be utilized to effectively withhold transmission capacity from the marketplace. However, methods for withholding transmission capacity are somewhat more convoluted, and probably more difficult, for owners of financial rights than for owners of physical rights. In this article, the author discusses some of the potential concerns over transmission rights and their use for the exercise of various forms of market power.« less

  2. Geospatial decision support framework for critical infrastructure interdependency assessment

    NASA Astrophysics Data System (ADS)

    Shih, Chung Yan

    Critical infrastructures, such as telecommunications, energy, banking and finance, transportation, water systems and emergency services are the foundations of modern society. There is a heavy dependence on critical infrastructures at multiple levels within the supply chain of any good or service. Any disruptions in the supply chain may cause profound cascading effect to other critical infrastructures. A 1997 report by the President's Commission on Critical Infrastructure Protection states that a serious interruption in freight rail service would bring the coal mining industry to a halt within approximately two weeks and the availability of electric power could be reduced in a matter of one to two months. Therefore, this research aimed at representing and assessing the interdependencies between coal supply, transportation and energy production. A proposed geospatial decision support framework was established and applied to analyze interdependency related disruption impact. By utilizing the data warehousing approach, geospatial and non-geospatial data were retrieved, integrated and analyzed based on the transportation model and geospatial disruption analysis developed in the research. The results showed that by utilizing this framework, disruption impacts can be estimated at various levels (e.g., power plant, county, state, etc.) for preventative or emergency response efforts. The information derived from the framework can be used for data mining analysis (e.g., assessing transportation mode usages; finding alternative coal suppliers, etc.).

  3. Autonomous data transmission apparatus

    DOEpatents

    Kotlyar, O.M.

    1997-03-25

    A autonomous borehole data transmission apparatus is described for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters. 4 figs.

  4. Electric vehicle charging technologies analysis and standards : final research project report.

    DOT National Transportation Integrated Search

    2017-02-01

    This project has evaluated the technologies and standards associated with Electric : Vehicle Service Equipment (EVSE) and the related infrastructure, and the major cost : issue related to electric vehicle (EV) charging -- the cost of utility power. T...

  5. [Infrastructure and adherence to hand hygiene: challenges to patient safety].

    PubMed

    Bathke, Janaína; de Cunico, Priscila Almeida; Maziero, Eliane Cristina Sanches; Cauduro, Fernanda Leticia Frates; Sarquis, Leila Maria Mansano; de Cruz, Elaine Drehmer Almeida

    2013-06-01

    Considering the importance of hands in the chain of transmission of microorganisms, this observational research investigated the material infrastructure and compliance of hand hygiene in an intensive care unit in the south of Brazil in 2010. The data was collected by direct non-participant observation and through the use of self-administered questionnaires to be completed by the 39 participants, which was analyzed with the assistance of the chi2 Test, descriptive statistics and quantitative discourse analysis. Although health professionals overestimate compliance rates, recognize the practice as relevant to the prevention of infection and refer there are no impeding factors, of the 1,277 opportunities observed, compliance was 26% and significantly lower before patient contact and the use of aseptic procedures than after patient contact: infrastructure was shown to be deficient. The results indicate risk to patient safety, and thus, the planning of corrective actions to promote hand washing is relevant.

  6. Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Woodford, D.

    This report provides an independent review including an initial evaluation of the technical configuration and capital costs of establishing an undersea cable system and examining impacts to the existing electric transmission systems as a result of interconnecting the islands

  7. Medical Data Transmission Using Cell Phone Networks

    NASA Astrophysics Data System (ADS)

    Voos, J.; Centeno, C.; Riva, G.; Zerbini, C.; Gonzalez, E.

    2011-12-01

    A big challenge in telemedicine systems is related to have the technical requirements needed for a successful implementation in remote locations where the available hardware and communication infrastructure is not adequate for a good medical data transmission. Despite of the wide standards availability, methodologies, applications and systems integration facilities in telemedicine, in many cases the implementation requirements are not achievable to allow the system execution in remote areas of our country. Therefore, this paper presents an alternative for the messages transmission related to medical studies using the cellular network and the standard HL7 V3 [1] for data modeling. The messages are transmitted to a web server and stored in a centralized database which allows data sharing with other specialists.

  8. Green Infrastructure

    EPA Pesticide Factsheets

    To promote the benefits of green infrastructure, help communities overcome barriers to using GI, and encourage the use of GI to create sustainable and resilient water infrastructure that improves water quality and supports and revitalizes communities.

  9. Reducing Cascading Failure Risk by Increasing Infrastructure Network Interdependence.

    PubMed

    Korkali, Mert; Veneman, Jason G; Tivnan, Brian F; Bagrow, James P; Hines, Paul D H

    2017-03-20

    Increased interconnection between critical infrastructure networks, such as electric power and communications systems, has important implications for infrastructure reliability and security. Others have shown that increased coupling between networks that are vulnerable to internetwork cascading failures can increase vulnerability. However, the mechanisms of cascading in these models differ from those in real systems and such models disregard new functions enabled by coupling, such as intelligent control during a cascade. This paper compares the robustness of simple topological network models to models that more accurately reflect the dynamics of cascading in a particular case of coupled infrastructures. First, we compare a topological contagion model to a power grid model. Second, we compare a percolation model of internetwork cascading to three models of interdependent power-communication systems. In both comparisons, the more detailed models suggest substantially different conclusions, relative to the simpler topological models. In all but the most extreme case, our model of a "smart" power network coupled to a communication system suggests that increased power-communication coupling decreases vulnerability, in contrast to the percolation model. Together, these results suggest that robustness can be enhanced by interconnecting networks with complementary capabilities if modes of internetwork failure propagation are constrained.

  10. Reducing Cascading Failure Risk by Increasing Infrastructure Network Interdependence

    NASA Astrophysics Data System (ADS)

    Korkali, Mert; Veneman, Jason G.; Tivnan, Brian F.; Bagrow, James P.; Hines, Paul D. H.

    2017-03-01

    Increased interconnection between critical infrastructure networks, such as electric power and communications systems, has important implications for infrastructure reliability and security. Others have shown that increased coupling between networks that are vulnerable to internetwork cascading failures can increase vulnerability. However, the mechanisms of cascading in these models differ from those in real systems and such models disregard new functions enabled by coupling, such as intelligent control during a cascade. This paper compares the robustness of simple topological network models to models that more accurately reflect the dynamics of cascading in a particular case of coupled infrastructures. First, we compare a topological contagion model to a power grid model. Second, we compare a percolation model of internetwork cascading to three models of interdependent power-communication systems. In both comparisons, the more detailed models suggest substantially different conclusions, relative to the simpler topological models. In all but the most extreme case, our model of a “smart” power network coupled to a communication system suggests that increased power-communication coupling decreases vulnerability, in contrast to the percolation model. Together, these results suggest that robustness can be enhanced by interconnecting networks with complementary capabilities if modes of internetwork failure propagation are constrained.

  11. Identification of potential locations of electric vehicle supply equipment

    NASA Astrophysics Data System (ADS)

    Brooker, R. Paul; Qin, Nan

    2015-12-01

    Proper placement of electric vehicle supply equipment (charging stations) requires an understanding of vehicle usage patterns. Using data from the National Household Travel Survey on vehicle mileage and destination patterns, analyses were performed to determine electric vehicles' charging needs, as a function of battery size and state of charge. This paper compares electric vehicle charging needs with Department of Energy electric vehicle charging data from real-world charging infrastructure. By combining the electric vehicles charging needs with charging data from real-world applications, locations with high electric vehicle charging likelihood are identified.

  12. Nanoparticle-Wetted Relays: Reconfigurable Surfaces for Energy Transmission Contacts

    DTIC Science & Technology

    2007-01-01

    in-situ monitoring of contact processes as described previously4,17. 9 1. Da Vinci , Leonardo . Madrid Codices, Manuscript I. Biblioteca Nacional...technologists from pre-Hellenistic pulleys and Da Vinci mechanisms for transmission of mechanical energy to modern switches and relays for...Hellenistic pulleys and Da Vinci mechanisms for transmission of mechanical energy1 to modern switches and relays for transmission of electrical energy

  13. A review of malaria transmission dynamics in forest ecosystems

    PubMed Central

    2014-01-01

    Malaria continues to be a major health problem in more than 100 endemic countries located primarily in tropical and sub-tropical regions around the world. Malaria transmission is a dynamic process and involves many interlinked factors, from uncontrollable natural environmental conditions to man-made disturbances to nature. Almost half of the population at risk of malaria lives in forest areas. Forests are hot beds of malaria transmission as they provide conditions such as vegetation cover, temperature, rainfall and humidity conditions that are conducive to distribution and survival of malaria vectors. Forests often lack infrastructure and harbor tribes with distinct genetic traits, socio-cultural beliefs and practices that greatly influence malaria transmission dynamics. Here we summarize the various topographical, entomological, parasitological, human ecological and socio-economic factors, which are crucial and shape malaria transmission in forested areas. An in-depth understanding and synthesis of the intricate relationship of these parameters in achieving better malaria control in various types of forest ecosystems is emphasized. PMID:24912923

  14. City of Las Vegas Plug-in Hybrid Electric Vehicle Demonstration Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2013-12-31

    The City of Las Vegas was awarded Department of Energy (DOE) project funding in 2009, for the City of Las Vegas Plug-in Hybrid Electric Vehicle Demonstration Program. This project allowed the City of Las Vegas to purchase electric and plug-in hybrid electric vehicles and associated electric vehicle charging infrastructure. The City anticipated the electric vehicles having lower overall operating costs and emissions similar to traditional and hybrid vehicles.

  15. Financial methods in competitive electricity markets

    NASA Astrophysics Data System (ADS)

    Deng, Shijie

    The restructuring of electric power industry has become a global trend. As reforms to the electricity supply industry spread rapidly across countries and states, many political and economical issues arise as a result of people debating over which approach to adopt in restructuring the vertically integrated electricity industry. This dissertation addresses issues of transmission pricing, electricity spot price modeling, as well as risk management and asset valuation in a competitive electricity industry. A major concern in the restructuring of the electricity industries is the design of a transmission pricing scheme that will ensure open-access to the transmission networks. I propose a priority-pricing scheme for zonal access to the electric power grid that is uniform across all buses in each zone. The Independent System Operator (ISO) charges bulk power traders a per unit ex ante transmission access fee based on the expected option value of the generated power with respect to the random zonal spot prices. The zonal access fee depends on the injection zone and a self-selected strike price determining the scheduling priority of the transaction. Inter zonal transactions are charged (or credited) with an additional ex post congestion fee that equals the zonal spot price difference. The unit access fee entitles a bulk power trader to either physical injection of one unit of energy or a compensation payment that equals to the difference between the realized zonal spot price and the selected strike price. The ISO manages congestion so as to minimize net compensation payments and thus, curtailment probabilities corresponding to a particular strike price may vary by bus. The rest of the dissertation deals with the issues of modeling electricity spot prices, pricing electricity financial instruments and the corresponding risk management applications. Modeling the spot prices of electricity is important for the market participants who need to understand the risk factors in

  16. 75 FR 77859 - Notice of Intent To Prepare a Programmatic Environmental Impact Statement for the Hawai‘i...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-14

    ... Energy Program (HIREP). Hawai`i proposes to facilitate the development of wind-generated electric energy and the required improvements to the existing electric transmission infrastructure in Hawai`i. This... energy technologies in Hawai`i. DATES: The public scoping period starts with the publication of this...

  17. Synergistic Use of Nighttime Satellite Data, Electric Utility Infrastructure, and Ambient Population to Improve Power Outage Detections in Urban Areas

    NASA Technical Reports Server (NTRS)

    Cole, Tony A.; Wanik, David W.; Molthan, Andrew L.; Roman, Miguel O.; Griffin, Robert E.

    2017-01-01

    Natural and anthropogenic hazards are frequently responsible for disaster events, leading to damaged physical infrastructure, which can result in loss of electrical power for affected locations. Remotely-sensed, nighttime satellite imagery from the Suomi National Polar-orbiting Partnership (Suomi-NPP) Visible Infrared Imaging Radiometer Suite (VIIRS) Day/Night Band (DNB) can monitor power outages in disaster-affected areas through the identification of missing city lights. When combined with locally-relevant geospatial information, these observations can be used to estimate power outages, defined as geographic locations requiring manual intervention to restore power. In this study, we produced a power outage product based on Suomi-NPP VIIRS DNB observations to estimate power outages following Hurricane Sandy in 2012. This product, combined with known power outage data and ambient population estimates, was then used to predict power outages in a layered, feedforward neural network model. We believe this is the first attempt to synergistically combine such data sources to quantitatively estimate power outages. The VIIRS DNB power outage product was able to identify initial loss of light following Hurricane Sandy, as well as the gradual restoration of electrical power. The neural network model predicted power outages with reasonable spatial accuracy, achieving Pearson coefficients (r) between 0.48 and 0.58 across all folds. Our results show promise for producing a continental United States (CONUS)- or global-scale power outage monitoring network using satellite imagery and locally-relevant geospatial data.

  18. Multi-Speed Transmission For Commercial Delivery Medium Duty PEDVs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chavdar, Bulent

    Successful completion of the proposed project will set a course for improving quality of life by overcoming key challenges in the gearbox for commercial-delivery, medium-duty, plug-in electric drive vehicles: It will reduce US dependency on foreign oil through the use of electric driven propulsion instead of fuel driven. It will reduce health risks by replacing tailpipe emissions in densely populated city centers. Finally, it will improve the performance-cost basis to meet or exceed the expectations of the targeted medium duty vehicle fleet owners and the independent customers. The proposed multi-speed transmission will narrow motor operation to the peak efficiency region,more » thereby increasing the electric powertrain efficiency to help close the range gap. Further, it will enhance customer satisfaction by improving vehicle acceleration, top speed and gradeability over the baseline. The project was conducted in three budget periods: In BP1: Technology Development, High-level vehicle powertrain models were used to optimize candidate transmission architectures and ratios along with a variety of traction motor characteristics for concept selection. The detailed driveline designs and component dynamics were investigated to meet medium-duty EV requirements; In BP2: Technology Development and Prototype Demonstration, The modeling and simulations with multi-speed transmissions were extended to other MD and HD EV platforms. Clean sheet design of a compact, lightweight, flexible, and modular, four-speed transmission was completed. Development of novel shifting and controls strategies were started and procurement of the prototype transmission and the controller hardware was begun; In BP3: Technology Integration, Testing, and Demonstration, Prototyping the four-speed automated mechanical transmission was completed. The transmission controls system and software development and preliminary gearbox dyno tests were done at Eaton. ORNL conducted integrated powertrain HIL

  19. Encouraging an ecological evolution of data infrastructure

    NASA Astrophysics Data System (ADS)

    Parsons, M. A.

    2015-12-01

    Infrastructure is often thought of as a complex physical construct usually designed to transport information or things (e.g. electricity, water, cars, money, sound, data…). The Research Data Alliance (RDA) takes a more holistic view and considers infrastructure as a complex body of relationships between people, machines, and organisations. This paper will describe how this more ecological perspective leads RDA to define and govern an agile virtual organization. We seek to harness the power of the volunteer, through an open problem solving approach that focusses on the problems of our individual members and their organisations. We focus on implementing solutions that make data sharing work better without defining a priori what is necessary. We do not judge the fitness of a solution, per se, but instead assess how broadly the solution is adopted, recognizing that adoption is often the social challenge of technical problem. We seek to encourage a bottoms up approach with light guidance on principles from the top. The goal is to develop community solutions that solve real problems today yet are adaptive to changing technologies and needs.

  20. Wireless acoustic-electric feed-through for power and signal transmission

    NASA Technical Reports Server (NTRS)

    Doty, Benjamin (Inventor); Badescu, Mircea (Inventor); Sherrit, Stewart (Inventor); Bao, Xiaoqi (Inventor); Bar-Cohen, Yoseph (Inventor); Chang, Zensheu (Inventor)

    2011-01-01

    An embodiment provides electrical energy from a source on one side of a medium to a load on the other side of the medium, the embodiment including a first piezoelectric to generate acoustic energy in response to electrical energy from the source, and a second piezoelectric to convert the received acoustic energy to electrical energy used by the load. Other embodiments are described and claimed.

  1. Optimal control of mode transition for four-wheel-drive hybrid electric vehicle with dry dual-clutch transmission

    NASA Astrophysics Data System (ADS)

    Zhao, Zhiguo; Lei, Dan; Chen, Jiayi; Li, Hangyu

    2018-05-01

    When the four-wheel-drive hybrid electric vehicle (HEV) equipped with a dry dual clutch transmission (DCT) is in the mode transition process from pure electrical rear wheel drive to front wheel drive with engine or hybrid drive, the problem of vehicle longitudinal jerk is prominent. A mode transition robust control algorithm which resists external disturbance and model parameter fluctuation has been developed, by taking full advantage of fast and accurate torque (or speed) response of three electrical power sources and getting the clutch of DCT fully involved in the mode transition process. Firstly, models of key components of driveline system have been established, and the model of five-degrees-of-freedom vehicle longitudinal dynamics has been built by using a Uni-Tire model. Next, a multistage optimal control method has been produced to realize the decision of engine torque and clutch-transmitted torque. The sliding-mode control strategy for measurable disturbance has been proposed at the stage of engine speed dragged up. Meanwhile, the double tracking control architecture that integrates the model calculating feedforward control with H∞ robust feedback control has been presented at the stage of speed synchronization. Finally, the results from Matlab/Simulink software and hardware-in-the-loop test both demonstrate that the proposed control strategy for mode transition can not only coordinate the torque among different power sources and clutch while minimizing vehicle longitudinal jerk, but also provide strong robustness to model uncertainties and external disturbance.

  2. The path to clean energy: direct coupling of nuclear and renewable technologies for thermal and electrical applications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bragg-Sitton, Shannon; Boardman, Richard; Ruth, Mark

    The U.S. Department of Energy (DOE) recognizes the need to transform the energy infrastructure of the U.S. and elsewhere to systems that can significantly reduce environmental impacts in an efficient and economically viable manner while utilizing both clean energy generation sources and hydrocarbon resources. Thus, DOE is supporting research and development that could lead to more efficient utilization of clean nuclear and renewable energy generation sources. A concept being advanced by the DOE Offices of Nuclear Energy (NE) and Energy Efficiency and Renewable Energy (EERE) is tighter coupling of nuclear and renewable energy sources in a manner that better optimizesmore » energy use for the combined electricity, industrial manufacturing, and the transportation sectors. This integration concept has been referred to as a “hybrid system” that is capable of providing energy (thermal or electrical) where it is needed, when it is needed. For the purposes of this work, the hybrid system would integrate two or more energy resources to generate two or more products, one of which must be an energy commodity, such as electricity or transportation fuel. This definition requires coupling of subsystems ‘‘behind’’ the electrical transmission bus, where energy flows are dynamically apportioned as necessary to meet demand and the system has a single connection to the grid that provides dispatchable electricity as required while capital intensive generation assets operate at full capacity. Development of integrated energy systems for an “energy park” must carefully consider the intended location and the associated regional resources, traditional industrial processes, energy delivery infrastructure, and markets to identify viable region-specific system configurations. This paper will provide an overview of the current status of regional hybrid energy system design, development and application of dynamic analysis tools to assess technical and economic performance

  3. Station-keeping of a high-altitude balloon with electric propulsion and wireless power transmission: A concept study

    NASA Astrophysics Data System (ADS)

    van Wynsberghe, Erinn; Turak, Ayse

    2016-11-01

    A stable, ultra long-duration high-altitude balloon (HAB) platform which can maintain stationary position would represent a new paradigm for telecommunications and high-altitude observation and transmission services, with greatly reduced cost and complexity compared to existing technologies including satellites, telecom towers, and unmanned aerial vehicles (UAVs). This contribution proposes a lightweight superpressure balloon platform for deployment to an altitude of 25 km. Electrohydrodynamic (EHD) thrusters are presented to maintain position by overcoming stratospheric winds. Critical to maintaining position is a continual supply of electrical power to operate the on-board propulsion system. One viable solution is to deliver power wirelessly to a high-altitude craft from a ground-based transmitter. Microwave energy, not heavily attenuated by the atmosphere, can be provided remotely from a ground-based generator (magnetron, klystron, etc.) and steered electrically with an antenna array (phased array) at a designated frequency (such as 2.45 or 5.8 GHz). A rectifying antenna ("rectenna") on the bottom of the balloon converts waves into direct current for on-board use. Preliminary mission architecture, energy requirements, and safety concerns for a proposed system are presented along with recommended future work.

  4. Electrical Work in Schools.

    ERIC Educational Resources Information Center

    Ontario Dept. of Education, Toronto. School Business and Finance Branch.

    Most buildings rely on electricity for lighting, power, signals, and other communications. Electric energy is also used for heating and year-round thermal conditioning of spaces. Its ease of transmission, simple control and measurement, and relative safety make it a useful source of energy. This publication is intended to provide those persons…

  5. Climate Change and Water Infrastructure in Central Asia: adaptation capacities and institutional challenges

    NASA Astrophysics Data System (ADS)

    Abdullaev, Iskandar; Rakhmatullaev, Shavkat

    2014-05-01

    The paper discusses vulnerability areas of water sector in arid Central Asia due to climate change projections with particular focus on adaptation to sustainable operation of physical infrastructure capacities (from legal, institutional and technical aspects). Two types of technical installations are the main focus of this paper, i.e., electrical lift irrigation systems and water reservoirs. The first set of electrical lift infrastructure is strategic for delivering water to water users via pumps, diversion structures, vertical drainage facilities and groundwater boreholes; on the other hand, the primarily task of second set of structures is to accumulate the water resources for sectors of economy. In Central Asia, approximately, 20-50% of irrigation water is lifted, yet major of lift structures are in very poor technical conditions coupled with ever increasing of electricity tariffs. Furthermore, useful volumes capacities of water reservoirs are being severely diminished due to bio-physical geomorphologic processes, improper operational regimes and chronic financing for special in-house sedimentation surveys. Most importantly, the key argument is that irrigation sector should internalize its adaptation efforts, i.e., integrate renewable energy technologies, energy audit programs and lastly design comprehensive investment prioritization processes and programs. Otherwise, water sector will be at great risk for continued provision of fundamental services to the public, food security and industry

  6. Infrastructure for thulium-170 isotope power systems for autonomous underwater vehicle fleets

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Walter, C.E.

    1991-07-01

    The radioisotope thulium-170 is a safe and environmentally benign heat source for providing the high endurance and energy densities needed by advanced power systems for autonomous underwater vehicles (AUV). Thulium Isotope Power (TIP) systems have an endurance of {approximately}3000 h, and gravimetric and volumetric energy densities of 3 {times} 10{sup 4} Wh/kg and 3 {times} 10{sup 8} Wh/m{sup 3}, respectively. These energy densities are more than 200 times higher than those currently provided by Ag-Zn battery technology. In order to capitalize on these performance levels with about one hundred AUVs in continuous use, it will be necessary to establish anmore » infrastructure for isotope production and heat-source refurbishment. The infrastructure cost is not trivial, and studies are needed to determine its optimum configuration. The major component of the projected infrastructure is the nuclear reactor used to produce Tm- 170 by neutron absorption in Tm-169. The reactor design should ideally be optimized for TM-170 production. Using the byproduct waste'' heat beneficially would help defray the cost of isotope production. However, generating electric power with the reactor would compromise both the cost of electricity and the isotope production capacity. A coastal location for the reactor would be most convenient from end-use considerations, and the waste'' heat could be used to desalinate seawater in water-thirsty states. 13 refs., 6 figs., 2 tabs.« less

  7. Economics of electricity

    NASA Astrophysics Data System (ADS)

    Erdmann, G.

    2015-08-01

    The following text is an introduction into the economic theory of electricity supply and demand. The basic approach of economics has to reflect the physical peculiarities of electric power that is based on the directed movement of electrons from the minus pole to the plus pole of a voltage source. The regular grid supply of electricity is characterized by a largely constant frequency and voltage. Thus, from a physical point of view electricity is a homogeneous product. But from an economic point of view, electricity is not homogeneous. Wholesale electricity prices show significant fluctuations over time and between regions, because this product is not storable (in relevant quantities) and there may be bottlenecks in the transmission and distribution grids. The associated non-homogeneity is the starting point of the economic analysis of electricity markets.

  8. Large-scale optimal control of interconnected natural gas and electrical transmission systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chiang, Nai-Yuan; Zavala, Victor M.

    2016-04-01

    We present a detailed optimal control model that captures spatiotemporal interactions between gas and electric transmission networks. We use the model to study flexibility and economic opportunities provided by coordination. A large-scale case study in the Illinois system reveals that coordination can enable the delivery of significantly larger amounts of natural gas to the power grid. In particular, under a coordinated setting, gas-fired generators act as distributed demand response resources that can be controlled by the gas pipeline operator. This enables more efficient control of pressures and flows in space and time and overcomes delivery bottlenecks. We demonstrate that themore » additional flexibility not only can benefit the gas operator but can also lead to more efficient power grid operations and results in increased revenue for gas-fired power plants. We also use the optimal control model to analyze computational issues arising in these complex models. We demonstrate that the interconnected Illinois system with full physical resolution gives rise to a highly nonlinear optimal control problem with 4400 differential and algebraic equations and 1040 controls that can be solved with a state-of-the-art sparse optimization solver. (C) 2016 Elsevier Ltd. All rights reserved.« less

  9. Progress In Developing An In-Pile Acoustically Telemetered Sensor Infrastructure

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith, James A.; Garrett, Steven L.; Heibel, Michael D.

    2016-09-01

    infrastructure based on acoustic wireless transmission of data that is being developed and tested by the INL, Penn State and Westinghouse.« less

  10. An Exploration of Professional Culture Differentials and Their Potential Impact on the Information Assurance Component of Optical Transmission Networks Design

    ERIC Educational Resources Information Center

    Cuthrell, Michael Gerard

    2011-01-01

    Optical transmission networks are an integral component of the critical infrastructures for many nations. Many people believe that optical transmission networks are impenetrable. In actuality, these networks possess weaknesses that can be exploited to bring about harm. An emerging Information Assurance (IA) industry has as its goals: to…

  11. Michigan E85 Infrastructure

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sandstrom, Matthew M.

    2012-03-30

    This is the final report for a grant-funded project to financially assist and otherwise provide support to projects that increase E85 infrastructure in Michigan at retail fueling locations. Over the two-year project timeframe, nine E85 and/or flex-fuel pumps were installed around the State of Michigan at locations currently lacking E85 infrastructure. A total of five stations installed the nine pumps, all providing cost share toward the project. By using cost sharing by station partners, the $200,000 provided by the Department of Energy facilitated a total project worth $746,332.85. This project was completed over a two-year timetable (eight quarters). The firstmore » quarter of the project focused on project outreach to station owners about the incentive on the installation and/or conversion of E85 compatible fueling equipment including fueling pumps, tanks, and all necessary electrical and plumbing connections. Utilizing Clean Energy Coalition (CEC) extensive knowledge of gasoline/ethanol infrastructure throughout Michigan, CEC strategically placed these pumps in locations to strengthen the broad availability of E85 in Michigan. During the first and second quarters, CEC staff approved projects for funding and secured contracts with station owners; the second through eighth quarters were spent working with fueling station owners to complete projects; the third through eighth quarters included time spent promoting projects; and beginning in the second quarter and running for the duration of the project was spent performing project reporting and evaluation to the US DOE. A total of 9 pumps were installed (four in Elkton, two in Sebewaing, one in East Lansing, one in Howell, and one in Whitmore Lake). At these combined station locations, a total of 192,445 gallons of E85, 10,786 gallons of E50, and 19,159 gallons of E30 were sold in all reporting quarters for 2011. Overall, the project has successfully displaced 162,611 gallons (2,663 barrels) of petroleum, and

  12. Jobs and Economic Development from New Transmission and Generation in Wyoming Fact Sheet

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2011-05-10

    Wyoming is a significant energy exporter, producing nearly 40% of the nation's coal and 10% of the nation's natural gas. However, opportunities to add new energy exports in the form of power generation are limited by insufficient transmission capacity. This fact sheet summarizes results from a recent analysis conducted by NREL for the Wyoming Infrastructure Authority that estimates jobs and economic development activity that could occur in Wyoming should the market support new investments in power generation and transmission in the state.

  13. Jobs and Economic Development from New Transmission and Generation in Wyoming (Fact Sheet)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    2011-05-01

    Wyoming is a significant energy exporter, producing nearly 40% of the nation's coal and 10% of the nation's natural gas. However, opportunities to add new energy exports in the form of power generation are limited by insufficient transmission capacity. This fact sheet summarizes results from a recent analysis conducted by NREL for the Wyoming Infrastructure Authority (WIA) that estimates jobs and economic development activity that could occur in Wyoming should the market support new investments in power generation and transmission in the state.

  14. Parallel digital forensics infrastructure.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Liebrock, Lorie M.; Duggan, David Patrick

    2009-10-01

    This report documents the architecture and implementation of a Parallel Digital Forensics infrastructure. This infrastructure is necessary for supporting the design, implementation, and testing of new classes of parallel digital forensics tools. Digital Forensics has become extremely difficult with data sets of one terabyte and larger. The only way to overcome the processing time of these large sets is to identify and develop new parallel algorithms for performing the analysis. To support algorithm research, a flexible base infrastructure is required. A candidate architecture for this base infrastructure was designed, instantiated, and tested by this project, in collaboration with New Mexicomore » Tech. Previous infrastructures were not designed and built specifically for the development and testing of parallel algorithms. With the size of forensics data sets only expected to increase significantly, this type of infrastructure support is necessary for continued research in parallel digital forensics. This report documents the implementation of the parallel digital forensics (PDF) infrastructure architecture and implementation.« less

  15. Millimeter wave transmission systems and related devices

    NASA Technical Reports Server (NTRS)

    Hebert, L. M.

    1984-01-01

    A survey was made of the state-of-the-art in millimeter (20 GHz to 300 GHz) wave transmission systems and related devices. The survey includes summaries of analytical studies and theoretical results that were obtained for various transmission line structures. This material was supplemented by further analysis where appropriate. The transmission line structures are evaluated in terms of electrical performance, ease of manufacture, usefulness for building other devices and compatibility with solid state devices. Descriptions of waveguide transmission lines which have commonly been used in the microwave frequency range are provided along with special attention given to the problems that these guides face when their use is extended into the millimeter wave range. Also, guides which have been introduced specifically to satisfy the requirements of millimeter wave transmission are discussed in detail.

  16. Electricity Capacity Expansion Modeling, Analysis, and Visualization. A Summary of High-Renewable Modeling Experience for China

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Blair, Nate; Zhou, Ella; Getman, Dan

    2015-10-01

    Mathematical and computational models are widely used for the analysis and design of both physical and financial systems. Modeling the electric grid is of particular importance to China for three reasons. First, power-sector assets are expensive and long-lived, and they are critical to any country's development. China's electric load, transmission, and other energy-related infrastructure are expected to continue to grow rapidly; therefore it is crucial to understand and help plan for the future in which those assets will operate (NDRC ERI 2015). Second, China has dramatically increased its deployment of renewable energy (RE), and is likely to continue further acceleratingmore » such deployment over the coming decades. Careful planning and assessment of the various aspects (technical, economic, social, and political) of integrating a large amount of renewables on the grid is required. Third, companies need the tools to develop a strategy for their own involvement in the power market China is now developing, and to enable a possible transition to an efficient and high RE future.« less

  17. IP Infrastructure Geolocation

    DTIC Science & Technology

    2015-03-01

    unlimited 13. ABSTRACT (maximum 200 words) Physical network maps are important to critical infrastructure defense and planning. Current state-of...the-art network infrastructure geolocation relies on Domain Name System (DNS) inferences. However, not only is using the DNS relatively inaccurate for...INTENTIONALLY LEFT BLANK iv ABSTRACT Physical network maps are important to critical infrastructure defense and planning. Cur- rent state-of-the-art

  18. Integrating sea floor observatory data: the EMSO data infrastructure

    NASA Astrophysics Data System (ADS)

    Huber, Robert; Azzarone, Adriano; Carval, Thierry; Doumaz, Fawzi; Giovanetti, Gabriele; Marinaro, Giuditta; Rolin, Jean-Francois; Beranzoli, Laura; Waldmann, Christoph

    2013-04-01

    The European research infrastructure EMSO is a European network of fixed-point, deep-seafloor and water column observatories deployed in key sites of the European Continental margin and Arctic. It aims to provide the technological and scientific framework for the investigation of the environmental processes related to the interaction between the geosphere, biosphere, and hydrosphere and for a sustainable management by long-term monitoring also with real-time data transmission. Since 2006, EMSO is on the ESFRI (European Strategy Forum on Research Infrastructures) roadmap and has entered its construction phase in 2012. Within this framework, EMSO is contributing to large infrastructure integration projects such as ENVRI and COOPEUS. The EMSO infrastructure is geographically distributed in key sites of European waters, spanning from the Arctic, through the Atlantic and Mediterranean Sea to the Black Sea. It is presently consisting of thirteen sites which have been identified by the scientific community according to their importance respect to Marine Ecosystems, Climate Changes and Marine GeoHazards. The data infrastructure for EMSO is being designed as a distributed system. Presently, EMSO data collected during experiments at each EMSO site are locally stored and organized in catalogues or relational databases run by the responsible regional EMSO nodes. Three major institutions and their data centers are currently offering access to EMSO data: PANGAEA, INGV and IFREMER. In continuation of the IT activities which have been performed during EMSOs twin project ESONET, EMSO is now implementing the ESONET data architecture within an operational EMSO data infrastructure. EMSO aims to be compliant with relevant marine initiatives such as MyOceans, EUROSITES, EuroARGO, SEADATANET and EMODNET as well as to meet the requirements of international and interdisciplinary projects such as COOPEUS and ENVRI, EUDAT and iCORDI. A major focus is therefore set on standardization and

  19. Testing GIC Mitigation Protocols by Modelling Transformer-Level GIC Flow in New Zealand's Electrical Transmission Grid

    NASA Astrophysics Data System (ADS)

    Divett, T.; Ingham, M.; Rodger, C. J.; Richardson, G. S.; Beggan, C.; Thomson, A. W. P.; Dalzell, M.; Mac Manus, D. H.

    2017-12-01

    Transformers in the South Island of Transpower New Zealand Ltd's electrical transmission network have been impacted by geomagnetically induced currents (GIC) during geomagnetic storms, including the November 2001 event. We aim to make recommendations that lead to improving mitigation strategies for reducing these impacts during extreme events. We have adapted a thin-sheet electromagnetic and GIC network modelling approach that has previously been successfully used in the UK to New Zealand's geology and transmission network. In this presentation we show how we have used this approach to explore Transpower's mitigation procedure as well as alternative mitigation options for reducing the impact of space weather on the network. In order to compare modelled GIC with what has been described as `possibly the best GIC dataset in the world' (Boteler and Pirjola, Pers. Comm. 2016) our model includes every transformer and every high voltage transmission line in the South Island network. This level of detail was required to match the transformer level observations of GIC in the network and to appropriately assess the mitigation options at the level where the damage to power networks occurs. We found that removing a single generator at a central power station and four transmission lines is enough to effectively redistribute GIC away from transformers that have previously experienced very high GIC (as shown in Figure). The redistributed GIC is less damaging to the transformers that it is redistributed to due to lower total GIC at those locations. In the past the impact of GIC on transformers has occurred in the first two minutes of a storm. Hence, mitigation strategies that currently rely on human intervention and involving delays of up to 15 minutes may need to be initiated very rapidly, in a significant departure from Transpower's existing protocol. Reducing delays should significantly reduce the potential for damage in a storm equivalent to the 2001 event. During an extreme

  20. Research on cost control and management in high voltage transmission line construction

    NASA Astrophysics Data System (ADS)

    Xu, Xiaobin

    2017-05-01

    Enterprises. The cost control is of vital importance to the construction enterprises. It is the key to the profitability of the transmission line project, which is related to the survival and development of the electric power construction enterprises. Due to the long construction line, complex and changeable construction terrain as well as large construction costs of transmission line, it is difficult for us to take accurate and effective cost control on the project implementation of entire transmission line. Therefore, the cost control of transmission line project is a complicated and arduous task. It is of great theoretical and practical significance to study the cost control scheme of transmission line project by a more scientific and efficient way. Based on the characteristics of the construction project of the transmission line project, this paper analyzes the construction cost structure of the transmission line project and the current cost control problem of the transmission line project, and demonstrates the necessity and feasibility of studying the cost control scheme of the transmission line project more accurately. In this way, the dynamic cycle cost control process including plan, implementation, feedback, correction, modification and re-implement is achieved to realize the accurate and effective cost control of entire electric power transmission line project.

  1. The Broadband Imperative: Recommendations to Address K-12 Education Infrastructure Needs. Executive Summary

    ERIC Educational Resources Information Center

    Fox, C.; Waters, J.; Fletcher, G.; Levin, D.

    2012-01-01

    It is a simple fact that access to high-speed broadband is now as vital a component of K-12 school infrastructure as electricity, air conditioning, and heating. The same tools and resources that have transformed educators' personal, civic, and professional lives must be part of learning experiences intended to prepare today's students for college…

  2. Reducing Cascading Failure Risk by Increasing Infrastructure Network Interdependence

    PubMed Central

    Korkali, Mert; Veneman, Jason G.; Tivnan, Brian F.; Bagrow, James P.; Hines, Paul D. H.

    2017-01-01

    Increased interconnection between critical infrastructure networks, such as electric power and communications systems, has important implications for infrastructure reliability and security. Others have shown that increased coupling between networks that are vulnerable to internetwork cascading failures can increase vulnerability. However, the mechanisms of cascading in these models differ from those in real systems and such models disregard new functions enabled by coupling, such as intelligent control during a cascade. This paper compares the robustness of simple topological network models to models that more accurately reflect the dynamics of cascading in a particular case of coupled infrastructures. First, we compare a topological contagion model to a power grid model. Second, we compare a percolation model of internetwork cascading to three models of interdependent power-communication systems. In both comparisons, the more detailed models suggest substantially different conclusions, relative to the simpler topological models. In all but the most extreme case, our model of a “smart” power network coupled to a communication system suggests that increased power-communication coupling decreases vulnerability, in contrast to the percolation model. Together, these results suggest that robustness can be enhanced by interconnecting networks with complementary capabilities if modes of internetwork failure propagation are constrained. PMID:28317835

  3. Body Area Network BAN--a key infrastructure element for patient-centered medical applications.

    PubMed

    Schmidt, Robert; Norgall, Thomas; Mörsdorf, Joachim; Bernhard, Josef; von der Grün, Thomas

    2002-01-01

    The Body Area Network (BAN) concept enables wireless communication between several miniaturized, intelligent Body Sensor (or actor) Units (BSU) and a single Body Central Unit (BCU) worn at the human body. A separate wireless transmission link from the BCU to a network access point--using different technology--provides for online access to BAN data via usual network infrastructure. BAN is expected to become a basic infrastructure element for service-based electronic health assistance: By integrating patient-attached sensors and control of mobile dedicated actor units, the range of medical workflow can be extended by wireless patient monitoring and therapy support. Beyond clinical use, professional disease management environments, and private personal health assistance scenarios (without financial reimbursement by health agencies/insurance companies), BAN enables a wide range of health care applications and related services.

  4. The selection of Lorenz laser parameters for transmission in the SMF 3rd transmission window

    NASA Astrophysics Data System (ADS)

    Gajda, Jerzy K.; Niesterowicz, Andrzej; Zeglinski, Grzegorz

    2003-10-01

    The work presents simulation of transmission line results with the fiber standard ITU-T G.652. The parameters of Lorenz laser decide about electrical signal parameters like eye pattern, jitter, BER, S/N, Q-factor, scattering diagram. For a short line lasers with linewidth larger than 100MHz can be used. In the paper cases for 10 Gbit/s and 40 Gbit/s transmission and the fiber length 30km, 50km, and 70km are calculated. The average open eye patterns were 1*10-5-120*10-5. The Q factor was 10-23dB. In calcuations the bit error rate (BER) was 10-40-10-4. If the bandwidth of Lorenz laser increases from 10 MHz to 500MHz a distance of transmission decrease from 70km to 30km. Very important for transmission distance is a rate bit of transmitter. If a bit rate increase from 10Gbit/s to 40 Gbit/s, the transmission distance for the signal mode fiber G.652 will decrease from 70km to 5km.

  5. First Annual Progress Report on Transmission of Information by Acoustic Communication along Metal Pathways in Nuclear Facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Heifetz, A.; Bakhtiari, S.; Huang, X.

    The objective of this project is to develop and demonstrate methods for transmission of information in nuclear facilities by acoustic means along existing in-place metal piping infrastructure. Pipes are omnipresent in a nuclear facility, and penetrate enclosures and partitions, such as the containment building wall. In the envisioned acoustic communication (AC) system, packets of information will be transmitted as guided acoustic waves along pipes. Performance of AC hardware and network protocols for efficient and secure communications under development in this project will be eventually evaluated in a representative nuclear power plant environment. Research efforts in the first year of thismore » project have been focused on identification of appropriate transducers, and evaluation of their performance for information transmission along nuclear-grade metallic pipes. COMSOL computer simulations were performed to study acoustic wave generation, propagation, and attenuation on pipes. An experimental benchtop system was used to evaluate signal attenuation and spectral dispersion using piezo-electric transducers (PZTs) and electromagnetic acoustic transducers (EMATs). Communication protocols under evaluation consisted on-off keying (OOK) signal modulation, in particular amplitude shift keying (ASK) and phase shift keying (PSK). Tradeoffs between signal power and communication data rate were considered for ASK and PSK coding schemes.« less

  6. Change in Brooklyn and Queens: How New York?s Reforming the Energy Vision Program and Con Edison Are Reshaping Electric Distribution Planning

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Coddington, Michael; Sciano, Damian; Fuller, Jason

    In response to this tremendous growth in both population and electricity demand, Con Edison estimates that its cost to expand the “traditional” Brooklyn-Queens grid will be in the neighborhood of US$1.2 billion—a relatively high number, even for New York City and Con Edison. The complexity of the city’s underground electrical system along with the difficulties of construction in a highly congested urban environment with infrastructure both above and below ground mean that the costs for transmission, substations, and secondary networks are significantly higher than those of a typical electric utility. The New York State Public Service Commission (PSC) is inmore » the process revising its approach to acquiring and serving energy throughout the state of New York, and traditional expansion for this rather costly project was not likely to be approved. Instead, the PSC asked Con Edison to evaluate numerous alternatives. The PSC and Con Edison are now considering and adopting strategies that include renewable energy generation, demand response (DR), battery energy storage systems, fuel-cell distributed generation, combined heat and power, volt-volt ampere reactive (VAR) optimization (VVO), and a host of other innovative solutions that would both reduce electricity demand and transform how and when Con Edison’s consumers use electricity.« less

  7. Twilight of the electric dinosaurs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Green, L. Jr.

    1990-11-22

    This article examines the future practicality of large electric generating plants and various technologies for transmitting energy other than electricity. The author describes advantages, cost and methods of chemical energy transmission in the form of methanol. Uses, production (including environmental impacts) and supply of methanol are also discussed.

  8. Electric vehicle propulsion alternatives

    NASA Technical Reports Server (NTRS)

    Secunde, R. R.; Schuh, R. M.; Beach, R. F.

    1983-01-01

    Propulsion technology development for electric vehicles is summarized. Analytical studies, technology evaluation, and the development of technology for motors, controllers, transmissions, and complete propulsion systems are included.

  9. The re-design at the transformer portion of transcutaneous energy transmission system for all implantable devices.

    PubMed

    Watada, Masaya; Saisho, Ryohei; Kim, Yong-Jae; Ohuchi, Katsuhiro; Takatani, Setsuo; Um, Yong-Su

    2007-01-01

    All implantable devices, such as an artificial heart, an artificial lung, a pacemaker, a defibrillator, need electric power. So the electric power supply through the skin is requested. Then, it is transcutaneous energy transmission system (TETS) that has been studied and used a lot. TETS is the system which performs an electric power supply by non-contact transcutaneously using the electromagnetic induction phenomenon of an external primary side coil and a secondary side coil in human body. In this research, we are developing the core type TETS which applied for the implantable devices. In this paper, corresponding to various conditions, such as a difference in required electric power and transmission distance change, the core type transformer which can hold high transmission efficiency is designed.

  10. A New Application of the Electrical Penetration Graph (EPG) for Acquiring and Measuring Electrical Signals in Phloem Sieve Elements

    PubMed Central

    Salvador-Recatalà, Vicenta; Tjallingii, W. Freddy

    2015-01-01

    Electrophysiological properties of cells are often studied in vitro, after dissociating them from their native environments. However, the study of electrical transmission between distant cells in an organism requires in vivo, artifact-free recordings of cells embedded within their native environment. The transmission of electrical signals from wounded to unwounded areas in a plant has since long piqued the interest of botanists. The phloem, the living part of the plant vasculature that is spread throughout the plant, has been postulated as a major tissue in electrical transmission in plants. The lack of suitable electrophysiological methods poses many challenges for the study of the electrical properties of the phloem cells in vivo. Here we present a novel approach for intracellular electrophysiology of sieve elements (SEs) that uses living aphids, or other phloem-feeding hemipteran insects, integrated in the electrical penetration graph (EPG) circuit. The versatility, robustness, and accuracy of this method made it possible to record and study in detail the wound-induced electrical signals in SEs of central veins of the model plant Arabidopsis thaliana1. Here we show that EPG-electrodes can be easily implemented for intracellular electrophysiological recordings of SEs in marginal veins, as well as to study the capacity of SEs to respond with electrical signals to several external stimuli. The EPG approach applied to intracellular electrophysiology of SEs can be implemented to a wide variety of plant species, in a large number of plant/insect combinations, and for many research aims. PMID:26168018

  11. Strategies, Protections and Mitigations for Electric Grid from Electromagnetic Pulse Effects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Foster, Rita Ann; Frickey, Steven Jay

    2016-01-01

    The mission of DOE’s Office of Electricity Delivery and Energy Reliability (OE) is to lead national efforts to modernize the electricity delivery system, enhance the security and reliability of America’s energy infrastructure and facilitate recovery from disruptions to the energy supply. One of the threats OE is concerned about is a high-altitude electro-magnetic pulse (HEMP) from a nuclear explosion and eletro-magnetic pulse (EMP) or E1 pulse can be generated by EMP weapons. DOE-OE provides federal leadership and technical guidance in addressing electric grid issues. The Idaho National Laboratory (INL) was chosen to conduct the EMP study for DOE-OE due tomore » its capabilities and experience in setting up EMP experiments on the electric grid and conducting vulnerability assessments and developing innovative technology to increase infrastructure resiliency. This report identifies known impacts to EMP threats, known mitigations and effectiveness of mitigations, potential cost of mitigation, areas for government and private partnerships in protecting the electric grid to EMP, and identifying gaps in our knowledge and protection strategies.« less

  12. Monitoring of levees, bridges, pipelines, and other critical infrastructure during the 2011 flooding in the Mississippi River Basin: Chapter J in 2011 floods of the central United States

    USGS Publications Warehouse

    Densmore, Brenda K.; Burton, Bethany L.; Dietsch, Benjamin J.; Cannia, James C.; Huizinga, Richard J.

    2014-01-01

    During the 2011 Mississippi River Basin flood, the U.S. Geological Survey evaluated aspects of critical river infrastructure at the request of and in support of local, State, and Federal Agencies. Geotechnical and hydrographic data collected by the U.S. Geological Survey at numerous locations were able to provide needed information about 2011 flood effects to those managing the critical infrastructure. These data were collected and processed in a short time frame to provide managers the ability to make a timely evaluation of the safety of the infrastructure and, when needed, to take action to secure and protect critical infrastructure. Critical infrastructure surveyed by the U.S. Geological Survey included levees, bridges, pipeline crossings, power plant intakes and outlets, and an electrical transmission tower. Capacitively coupled resistivity data collected along the flood-protection levees surrounding the Omaha Public Power District Nebraska City power plant (Missouri River Levee Unit R573), mapped the near-subsurface electrical properties of the levee and the materials immediately below it. The near-subsurface maps provided a better understanding of the levee construction and the nature of the lithology beneath the levee. Comparison of the capacitively coupled resistivity surveys and soil borings indicated that low-resistivity value material composing the levee generally is associated with lean clay and silt to about 2 to 4 meters below the surface, overlying a more resistive layer associated with sand deposits. In general, the resistivity structure becomes more resistive to the south and the southern survey sections correlate well with the borehole data that indicate thinner clay and silt at the surface and thicker sand sequences at depth in these sections. With the resistivity data Omaha Public Power District could focus monitoring efforts on areas with higher resistivity values (coarser-grained deposits or more loosely compacted section), which typically are

  13. Sustainable Water Infrastructure

    EPA Pesticide Factsheets

    Resources for state and local environmental and public health officials, and water, infrastructure and utility professionals to learn about sustainable water infrastructure, sustainable water and energy practices, and their role.

  14. Optimizing your options: Extracting the full economic value of transmission when planning under uncertainty

    DOE PAGES

    Munoz, Francisco D.; Watson, Jean -Paul; Hobbs, Benjamin F.

    2015-06-04

    In this study, the anticipated magnitude of needed investments in new transmission infrastructure in the U.S. requires that these be allocated in a way that maximizes the likelihood of achieving society's goals for power system operation. The use of state-of-the-art optimization tools can identify cost-effective investment alternatives, extract more benefits out of transmission expansion portfolios, and account for the huge economic, technology, and policy uncertainties that the power sector faces over the next several decades.

  15. Assessing Terrorist Motivations for Attacking Critical Infrastructure

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ackerman, G; Abhayaratne, P; Bale, J

    Certain types of infrastructure--critical infrastructure (CI)--play vital roles in underpinning our economy, security and way of life. These complex and often interconnected systems have become so ubiquitous and essential to day-to-day life that they are easily taken for granted. Often it is only when the important services provided by such infrastructure are interrupted--when we lose easy access to electricity, health care, telecommunications, transportation or water, for example--that we are conscious of our great dependence on these networks and of the vulnerabilities that stem from such dependence. Unfortunately, it must be assumed that many terrorists are all too aware that CImore » facilities pose high-value targets that, if successfully attacked, have the potential to dramatically disrupt the normal rhythm of society, cause public fear and intimidation, and generate significant publicity. Indeed, revelations emerging at the time of this writing about Al Qaida's efforts to prepare for possible attacks on major financial facilities in New York, New Jersey, and the District of Columbia remind us just how real and immediate such threats to CI may be. Simply being aware that our nation's critical infrastructure presents terrorists with a plethora of targets, however, does little to mitigate the dangers of CI attacks. In order to prevent and preempt such terrorist acts, better understanding of the threats and vulnerabilities relating to critical infrastructure is required. The Center for Nonproliferation Studies (CNS) presents this document as both a contribution to the understanding of such threats and an initial effort at ''operationalizing'' its findings for use by analysts who work on issues of critical infrastructure protection. Specifically, this study focuses on a subsidiary aspect of CI threat assessment that has thus far remained largely unaddressed by contemporary terrorism research: the motivations and related factors that determine whether a

  16. Game-theoretic equilibrium analysis applications to deregulated electricity markets

    NASA Astrophysics Data System (ADS)

    Joung, Manho

    This dissertation examines game-theoretic equilibrium analysis applications to deregulated electricity markets. In particular, three specific applications are discussed: analyzing the competitive effects of ownership of financial transmission rights, developing a dynamic game model considering the ramp rate constraints of generators, and analyzing strategic behavior in electricity capacity markets. In the financial transmission right application, an investigation is made of how generators' ownership of financial transmission rights may influence the effects of the transmission lines on competition. In the second application, the ramp rate constraints of generators are explicitly modeled using a dynamic game framework, and the equilibrium is characterized as the Markov perfect equilibrium. Finally, the strategic behavior of market participants in electricity capacity markets is analyzed and it is shown that the market participants may exaggerate their available capacity in a Nash equilibrium. It is also shown that the more conservative the independent system operator's capacity procurement, the higher the risk of exaggerated capacity offers.

  17. Critical infrastructure protection.

    PubMed

    Deitz, Kim M

    2012-01-01

    Current government policies for protecting the nation's critical infrastructure are described in this article which focuses on hospital disaster planning and incident management and the significant role of Security in infrastructure protection

  18. Electric Power Generation, Transmission and Distribution (NAICS 2211)

    EPA Pesticide Factsheets

    Find EPA regulatory information for electrical utilities, including coal-fired power plants. Includes links to NESHAPs for RICE, stationary combustion engines, fossil fuel waste, cooling water, effluent guidelines. Find information on the MATS rule.

  19. Assessing the Operational Resilience of Electrical Distribution Systems

    DTIC Science & Technology

    2017-09-01

    as solar, hydro, wind , nuclear, or gas turbine power plants, produce electricity. Transmission systems move electricity in bulk from the originating...us. As I continue in my career I will consistently seek to emulate your attention to detail and ability to quickly frame and solve a problem . Thank...generation facility can cause problems (Knaus, 2017). Disruptions to transmission systems, either from the loss of a high-voltage line or a substation, can

  20. Corrugated outer sheath gas-insulated transmission line

    DOEpatents

    Kemeny, George A.; Cookson, Alan H.

    1981-01-01

    A gas-insulated transmission line includes two transmission line sections each of which are formed of a corrugated outer housing enclosing an inner high-voltage conductor disposed therein, with insulating support means supporting the inner conductor within the outer housing and an insulating gas providing electrical insulation therebetween. The outer housings in each section have smooth end sections at the longitudinal ends thereof which are joined together by joining means which provide for a sealing fixed joint.

  1. Synaptic Effects of Electric Fields

    NASA Astrophysics Data System (ADS)

    Rahman, Asif

    Learning and sensory processing in the brain relies on the effective transmission of information across synapses. The strength and efficacy of synaptic transmission is modifiable through training and can be modulated with noninvasive electrical brain stimulation. Transcranial electrical stimulation (TES), specifically, induces weak intensity and spatially diffuse electric fields in the brain. Despite being weak, electric fields modulate spiking probability and the efficacy of synaptic transmission. These effects critically depend on the direction of the electric field relative to the orientation of the neuron and on the level of endogenous synaptic activity. TES has been used to modulate a wide range of neuropsychiatric indications, for various rehabilitation applications, and cognitive performance in diverse tasks. How can a weak and diffuse electric field, which simultaneously polarizes neurons across the brain, have precise changes in brain function? Designing therapies to maximize desired outcomes and minimize undesired effects presents a challenging problem. A series of experiments and computational models are used to define the anatomical and functional factors leading to specificity of TES. Anatomical specificity derives from guiding current to targeted brain structures and taking advantage of the direction-sensitivity of neurons with respect to the electric field. Functional specificity originates from preferential modulation of neuronal networks that are already active. Diffuse electric fields may recruit connected brain networks involved in a training task and promote plasticity along active synaptic pathways. In vitro, electric fields boost endogenous synaptic plasticity and raise the ceiling for synaptic learning with repeated stimulation sessions. Synapses undergoing strong plasticity are preferentially modulated over weak synapses. Therefore, active circuits that are involved in a task could be more susceptible to stimulation than inactive circuits

  2. Climate Change and Future U.S. Electricity Infrastructure: the Nexus between Water Availability, Land Suitability, and Low-Carbon Technologies

    NASA Astrophysics Data System (ADS)

    Rice, J.; Halter, T.; Hejazi, M. I.; Jensen, E.; Liu, L.; Olson, J.; Patel, P.; Vernon, C. R.; Voisin, N.; Zuljevic, N.

    2014-12-01

    Integrated assessment models project the future electricity generation mix under different policy, technology, and socioeconomic scenarios, but they do not directly address site-specific factors such as interconnection costs, population density, land use restrictions, air quality, NIMBY concerns, or water availability that might affect the feasibility of achieving the technology mix. Moreover, since these factors can change over time due to climate, policy, socioeconomics, and so on, it is important to examine the dynamic feasibility of integrated assessment scenarios "on the ground." This paper explores insights from coupling an integrated assessment model (GCAM-USA) with a geospatial power plant siting model (the Capacity Expansion Regional Feasibility model, CERF) within a larger multi-model framework that includes regional climate, hydrologic, and water management modeling. GCAM-USA is a dynamic-recursive market equilibrium model simulating the impact of carbon policies on global and national markets for energy commodities and other goods; one of its outputs is the electricity generation mix and expansion at the state-level. It also simulates water demands from all sectors that are downscaled as input to the water management modeling. CERF simulates siting decisions by dynamically representing suitable areas for different generation technologies with geospatial analyses (informed by technology-specific siting criteria, such as required mean streamflow per the Clean Water Act), and then choosing siting locations to minimize interconnection costs (to electric transmission and gas pipelines). CERF results are compared across three scenarios simulated by GCAM-USA: 1) a non-mitigation scenario (RCP8.5) in which conventional fossil-fueled technologies prevail, 2) a mitigation scenario (RCP4.5) in which the carbon price causes a shift toward nuclear, carbon capture and sequestration (CCS), and renewables, and 3) a repeat of scenario (2) in which CCS technologies are

  3. Electrical Resistivity Imaging Below Nuclear Waste Tank Farms at the Hanford Site

    NASA Astrophysics Data System (ADS)

    Rucker, D. F.; Levitt, M. T.

    2006-12-01

    The Hanford Site, a Department of Energy nuclear processing facility in eastern Washington, contains a complex series of radiological liquid waste disposal and storage facilities. The primary method of interim storage is the use of large single-shelled steel tanks with capacities of up to 3790 m3 (1 million gallons). The tanks are organized below ground into tank farms, with about 12 tanks per farm. The liquid waste within the tanks is primarily comprised of inorganic salts with minor constituents of heavy metals and radiological metals. The electrical properties of the radiological waste are significantly different to that of the surrounding engineered fill and native geologic formations. Over the past 60 years since the earliest tanks have been in use, many have been known to leak. An electrical resistivity survey was conducted within a tank farm to map the extent of the plumes resulting from historic leaks. Traditional surface-based electrical resistivity surveys resulted in unusable data due to the significant subsurface infrastructure that included a network of delivery pipes, wells, fences, and electrical discharge sources . HGI adapted the resistivity technique to include the site infrastructure as transceivers to augment data density and geometry. The results show a distribution of low resistivity values within the farm in areas that match known historic leak sites. The addition of site infrastructure as sensors demonstrates that the electrical resistivity technique can be used in highly industrial sites.

  4. Economic Impacts of Infrastructure Damages on Industrial Sector

    NASA Astrophysics Data System (ADS)

    Kajitani, Yoshio

    This paper proposes a basic model for evaluating economic impacts on industrial sectors under the conditions that multiple infrastructures are simultaneously damaged during the earthquake disasters. Especially, focusing on the available economic data developed in the smallest spatial scale in Japan (small area statistics), economic loss estimation model based on the small area statistics and its applicability are investigated on. In the detail, a loss estimation framework, utilizing survey results on firms' activities under electricity, water and gas disruptions, and route choice models in Transportation Engineering, are applied to the case of 2004 Mid-Niigata Earthquake.

  5. HVDC power transmission technology assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hauth, R.L.; Tatro, P.J.; Railing, B.D.

    1997-04-01

    The purpose of this study was to develop an assessment of the national utility system`s needs for electric transmission during the period 1995-2020 that could be met by future reduced-cost HVDC systems. The assessment was to include an economic evaluation of HVDC as a means for meeting those needs as well as a comparison with competing technologies such as ac transmission with and without Flexible AC Transmission System (FACTS) controllers. The role of force commutated dc converters was to be assumed where appropriate. The assessment begins by identifying the general needs for transmission in the U.S. in the context ofmore » a future deregulated power industry. The possible roles for direct current transmission are then postulated in terms of representative scenarios. A few of the scenarios are illustrated with the help of actual U.S. system examples. non-traditional applications as well as traditional applications such as long lines and asynchronous interconnections are discussed. The classical ``break-even distance`` concept for comparing HVDC and ac lines is used to assess the selected scenarios. The impact of reduced-cost converters is reflected in terms of the break-even distance. This report presents a comprehensive review of the functional benefits of HVDC transmission and updated cost data for both ac and dc system components. It also provides some provocative thoughts on how direct current transmission might be applied to better utilize and expand our nation`s increasingly stressed transmission assets.« less

  6. Individual welfare maximization in electricity markets including consumer and full transmission system modeling

    NASA Astrophysics Data System (ADS)

    Weber, James Daniel

    1999-11-01

    This dissertation presents a new algorithm that allows a market participant to maximize its individual welfare in the electricity spot market. The use of such an algorithm in determining market equilibrium points, called Nash equilibria, is also demonstrated. The start of the algorithm is a spot market model that uses the optimal power flow (OPF), with a full representation of the transmission system. The OPF is also extended to model consumer behavior, and a thorough mathematical justification for the inclusion of the consumer model in the OPF is presented. The algorithm utilizes price and dispatch sensitivities, available from the Hessian matrix of the OPF, to help determine an optimal change in an individual's bid. The algorithm is shown to be successful in determining local welfare maxima, and the prospects for scaling the algorithm up to realistically sized systems are very good. Assuming a market in which all participants maximize their individual welfare, economic equilibrium points, called Nash equilibria, are investigated. This is done by iteratively solving the individual welfare maximization algorithm for each participant until a point is reached where all individuals stop modifying their bids. It is shown that these Nash equilibria can be located in this manner. However, it is also demonstrated that equilibria do not always exist, and are not always unique when they do exist. It is also shown that individual welfare is a highly nonconcave function resulting in many local maxima. As a result, a more global optimization technique, using a genetic algorithm (GA), is investigated. The genetic algorithm is successfully demonstrated on several systems. It is also shown that a GA can be developed using special niche methods, which allow a GA to converge to several local optima at once. Finally, the last chapter of this dissertation covers the development of a new computer visualization routine for power system analysis: contouring. The contouring algorithm is

  7. Electricity tommorrow

    NASA Astrophysics Data System (ADS)

    1981-01-01

    The critical issues for the electricity sector in California were presented. Adopted level of electricity demand and adopted policies and supply criteria are included. These form the basis for planning and certification of electric generation and transmission facilities by the energy commission. Estimates of the potential contributions of conservation and various conventional and alternative supply sources, critiques of utility supply plans, and determinations of how much new capacity is required are also included. Policy recommendations for directing public and private investments into preferred energy options, for spreading the benefits and costs of these options broadly and fairly among California's citizens, and for removing remaining obstacles to the development of all acceptable energy sources are presented.

  8. Electricity Capacity Expansion Modeling, Analysis, and Visualization: A Summary of High-Renewable Modeling Experiences (Chinese Translation) (in Chinese)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Blair, Nate; Zhou, Ella; Getman, Dan

    2015-10-01

    This is the Chinese translation of NREL/TP-6A20-64831. Mathematical and computational models are widely used for the analysis and design of both physical and financial systems. Modeling the electric grid is of particular importance to China for three reasons. First, power-sector assets are expensive and long-lived, and they are critical to any country's development. China's electric load, transmission, and other energy-related infrastructure are expected to continue to grow rapidly; therefore it is crucial to understand and help plan for the future in which those assets will operate. Second, China has dramatically increased its deployment of renewable energy (RE), and is likelymore » to continue further accelerating such deployment over the coming decades. Careful planning and assessment of the various aspects (technical, economic, social, and political) of integrating a large amount of renewables on the grid is required. Third, companies need the tools to develop a strategy for their own involvement in the power market China is now developing, and to enable a possible transition to an efficient and high RE future.« less

  9. Economics in Criticality and Restoration of Energy Infrastructures.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boyd, Gale A.; Flaim, Silvio J.; Folga, Stephen M.

    Economists, systems analysts, engineers, regulatory specialists, and other experts were assembled from academia, the national laboratories, and the energy industry to discuss present restoration practices (many have already been defined to the level of operational protocols) in the sectors of the energy infrastructure as well as other infrastructures, to identify whether economics, a discipline concerned with the allocation of scarce resources, is explicitly or implicitly a part of restoration strategies, and if there are novel economic techniques and solution methods that could be used help encourage the restoration of energy services more quickly than present practices or to restore servicemore » more efficiently from an economic perspective. AcknowledgementsDevelopment of this work into a coherent product with a useful message has occurred thanks to the thoughtful support of several individuals:Kenneth Friedman, Department of Energy, Office of Energy Assurance, provided the impetus for the work, as well as several suggestions and reminders of direction along the way. Funding from DOE/OEA was critical to the completion of this effort.Arnold Baker, Chief Economist, Sandia National Laboratories, and James Peerenboom, Director, Infrastructure Assurance Center, Argonne National Laboratory, provided valuable contacts that helped to populate the authoring team with the proper mix of economists, engineers, and systems and regulatory specialists to meet the objectives of the work.Several individuals provided valuable review of the document at various stages of completion, and provided suggestions that were valuable to the editing process. This list of reviewers includes Jeffrey Roark, Economist, Tennessee Valley Authority; James R. Dalrymple, Manager of Transmission System Services and Transmission/Power Supply, Tennessee Valley Authority; William Mampre, Vice President, EN Engineering; Kevin Degenstein, EN Engineering; and Patrick Wilgang, Department of Energy, Office

  10. Project Startup: Evaluating the Performance of Electric Buses

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    2016-04-01

    The National Renewable Energy Laboratory (NREL) is evaluating the in-service performance of fast-charge battery electric buses compared to compressed natural gas (CNG) buses operated by Foothill Transit in West Covina, California. Launched in 2015 in collaboration with the California Air Resources Board, this study aims to improve understanding of the overall use and effectiveness of fast-charge electric buses and associated charging infrastructure in transit operation.

  11. [Attributes of forest infrastructure].

    PubMed

    Gao, Jun-kai; Jin, Ying-shan

    2007-06-01

    This paper discussed the origin and evolution of the conception of ecological infrastructure, the understanding of international communities about the functions of forest, the important roles of forest in China' s economic development and ecological security, and the situations and challenges to the ongoing forestry ecological restoration programs. It was suggested that forest should be defined as an essential infrastructure for national economic and social development in a modern society. The critical functions of forest infrastructure played in the transition of forestry ecological development were emphasized. Based on the synthesis of forest ecosystem features, it was considered that the attributes of forest infrastructure are distinctive, due to the fact that it is constructed by living biological material and diversified in ownership. The forestry ecological restoration program should not only follow the basic principles of infrastructural construction, but also take the special characteristics of forests into consideration in studying the managerial system of the programs. Some suggestions for the ongoing programs were put forward: 1) developing a modern concept of ecosystem where man and nature in harmony is the core, 2) formulating long-term stable investments for forestry ecological restoration programs, 3) implementing forestry ecological restoration programs based on infrastructure construction principles, and 4) managing forests according to the principles of infrastructural construction management.

  12. Green infrastructure and its catchment-scale effects: an emerging science

    PubMed Central

    Golden, Heather E.; Hoghooghi, Nahal

    2018-01-01

    Urbanizing environments alter the hydrological cycle by redirecting stream networks for stormwater and wastewater transmission and increasing impermeable surfaces. These changes thereby accelerate the runoff of water and its constituents following precipitation events, alter evapotranspiration processes, and indirectly modify surface precipitation patterns. Green infrastructure, or low-impact development (LID), can be used as a standalone practice or in concert with gray infrastructure (traditional stormwater management approaches) for cost-efficient, decentralized stormwater management. The growth in LID over the past several decades has resulted in a concomitant increase in research evaluating LID efficiency and effectiveness, but mostly at localized scales. There is a clear research need to quantify how LID practices affect water quantity (i.e., runoff and discharge) and quality at the scale of catchments. In this overview, we present the state of the science of LID research at the local scale, considerations for scaling this research to catchments, recent advances and findings in scaling the effects of LID practices on water quality and quantity at catchment scales, and the use of models as novel tools for these scaling efforts. PMID:29682288

  13. Green infrastructure and its catchment-scale effects: an emerging science.

    PubMed

    Golden, Heather E; Hoghooghi, Nahal

    2018-01-01

    Urbanizing environments alter the hydrological cycle by redirecting stream networks for stormwater and wastewater transmission and increasing impermeable surfaces. These changes thereby accelerate the runoff of water and its constituents following precipitation events, alter evapotranspiration processes, and indirectly modify surface precipitation patterns. Green infrastructure, or low-impact development (LID), can be used as a standalone practice or in concert with gray infrastructure (traditional stormwater management approaches) for cost-efficient, decentralized stormwater management. The growth in LID over the past several decades has resulted in a concomitant increase in research evaluating LID efficiency and effectiveness, but mostly at localized scales. There is a clear research need to quantify how LID practices affect water quantity (i.e., runoff and discharge) and quality at the scale of catchments. In this overview, we present the state of the science of LID research at the local scale, considerations for scaling this research to catchments, recent advances and findings in scaling the effects of LID practices on water quality and quantity at catchment scales, and the use of models as novel tools for these scaling efforts.

  14. Stochastic Coloured Petrinet Based Healthcare Infrastructure Interdependency Model

    NASA Astrophysics Data System (ADS)

    Nukavarapu, Nivedita; Durbha, Surya

    2016-06-01

    The Healthcare Critical Infrastructure (HCI) protects all sectors of the society from hazards such as terrorism, infectious disease outbreaks, and natural disasters. HCI plays a significant role in response and recovery across all other sectors in the event of a natural or manmade disaster. However, for its continuity of operations and service delivery HCI is dependent on other interdependent Critical Infrastructures (CI) such as Communications, Electric Supply, Emergency Services, Transportation Systems, and Water Supply System. During a mass casualty due to disasters such as floods, a major challenge that arises for the HCI is to respond to the crisis in a timely manner in an uncertain and variable environment. To address this issue the HCI should be disaster prepared, by fully understanding the complexities and interdependencies that exist in a hospital, emergency department or emergency response event. Modelling and simulation of a disaster scenario with these complexities would help in training and providing an opportunity for all the stakeholders to work together in a coordinated response to a disaster. The paper would present interdependencies related to HCI based on Stochastic Coloured Petri Nets (SCPN) modelling and simulation approach, given a flood scenario as the disaster which would disrupt the infrastructure nodes. The entire model would be integrated with Geographic information based decision support system to visualize the dynamic behaviour of the interdependency of the Healthcare and related CI network in a geographically based environment.

  15. Aging Water Infrastructure

    EPA Science Inventory

    The Aging Water Infrastructure (AWI) research program is part of EPA’s larger effort called the Sustainable Water Infrastructure (SI) initiative. The SI initiative brings together drinking water and wastewater utility managers; trade associations; local watershed protection organ...

  16. Co-evolution of electric and telecommunications networks

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rivkin, S.R.

    1998-05-01

    There are potentially significant societal benefits in co-evolution between electricity and telecommunications in the areas of common infrastructure, accelerated deployment of distributed energy, tighter integration of information flow for energy management and distribution, and improved customer care. With due regard for natural processes that are more potent than any regulation and more real than any ideology, the gains from co-evolution would far outweigh the attenuated and speculative savings from restructuring of electricity that is too simplistic.

  17. MFC Communications Infrastructure Study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Michael Cannon; Terry Barney; Gary Cook

    2012-01-01

    Unprecedented growth of required telecommunications services and telecommunications applications change the way the INL does business today. High speed connectivity compiled with a high demand for telephony and network services requires a robust communications infrastructure.   The current state of the MFC communication infrastructure limits growth opportunities of current and future communication infrastructure services. This limitation is largely due to equipment capacity issues, aging cabling infrastructure (external/internal fiber and copper cable) and inadequate space for telecommunication equipment. While some communication infrastructure improvements have been implemented over time projects, it has been completed without a clear overall plan and technology standard.more »   This document identifies critical deficiencies with the current state of the communication infrastructure in operation at the MFC facilities and provides an analysis to identify needs and deficiencies to be addressed in order to achieve target architectural standards as defined in STD-170. The intent of STD-170 is to provide a robust, flexible, long-term solution to make communications capabilities align with the INL mission and fit the various programmatic growth and expansion needs.« less

  18. Measurement of atomic electric fields and charge densities from average momentum transfers using scanning transmission electron microscopy.

    PubMed

    Müller-Caspary, Knut; Krause, Florian F; Grieb, Tim; Löffler, Stefan; Schowalter, Marco; Béché, Armand; Galioit, Vincent; Marquardt, Dennis; Zweck, Josef; Schattschneider, Peter; Verbeeck, Johan; Rosenauer, Andreas

    2017-07-01

    This study sheds light on the prerequisites, possibilities, limitations and interpretation of high-resolution differential phase contrast (DPC) imaging in scanning transmission electron microscopy (STEM). We draw particular attention to the well-established DPC technique based on segmented annular detectors and its relation to recent developments based on pixelated detectors. These employ the expectation value of the momentum transfer as a reliable measure of the angular deflection of the STEM beam induced by an electric field in the specimen. The influence of scattering and propagation of electrons within the specimen is initially discussed separately and then treated in terms of a two-state channeling theory. A detailed simulation study of GaN is presented as a function of specimen thickness and bonding. It is found that bonding effects are rather detectable implicitly, e.g., by characteristics of the momentum flux in areas between the atoms than by directly mapping electric fields and charge densities. For strontium titanate, experimental charge densities are compared with simulations and discussed with respect to experimental artifacts such as scan noise. Finally, we consider practical issues such as figures of merit for spatial and momentum resolution, minimum electron dose, and the mapping of larger-scale, built-in electric fields by virtue of data averaged over a crystal unit cell. We find that the latter is possible for crystals with an inversion center. Concerning the optimal detector design, this study indicates that a sampling of 5mrad per pixel is sufficient in typical applications, corresponding to approximately 10×10 available pixels. Copyright © 2016 Elsevier B.V. All rights reserved.

  19. Impact of Uncoordinated Plug-in Electric Vehicle Charging on Residential Power Demand

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Muratori, Matteo

    Electrification of transport offers opportunities to increase energy security, reduce carbon emissions, and improve local air quality. Plug-in electric vehicles (PEVs) are creating new connections between the transportation and electric sectors, and PEV charging will create opportunities and challenges in a system of growing complexity. Here, I use highly resolved models of residential power demand and PEV use to assess the impact of uncoordinated in-home PEV charging on residential power demand. While the increase in aggregate demand might be minimal even for high levels of PEV adoption, uncoordinated PEV charging could significantly change the shape of the aggregate residential demand,more » with impacts for electricity infrastructure, even at low adoption levels. Clustering effects in vehicle adoption at the local level might lead to high PEV concentrations even if overall adoption remains low, significantly increasing peak demand and requiring upgrades to the electricity distribution infrastructure. This effect is exacerbated when adopting higher in-home power charging.« less

  20. Impact of uncoordinated plug-in electric vehicle charging on residential power demand

    NASA Astrophysics Data System (ADS)

    Muratori, Matteo

    2018-03-01

    Electrification of transport offers opportunities to increase energy security, reduce carbon emissions, and improve local air quality. Plug-in electric vehicles (PEVs) are creating new connections between the transportation and electric sectors, and PEV charging will create opportunities and challenges in a system of growing complexity. Here, I use highly resolved models of residential power demand and PEV use to assess the impact of uncoordinated in-home PEV charging on residential power demand. While the increase in aggregate demand might be minimal even for high levels of PEV adoption, uncoordinated PEV charging could significantly change the shape of the aggregate residential demand, with impacts for electricity infrastructure, even at low adoption levels. Clustering effects in vehicle adoption at the local level might lead to high PEV concentrations even if overall adoption remains low, significantly increasing peak demand and requiring upgrades to the electricity distribution infrastructure. This effect is exacerbated when adopting higher in-home power charging.

  1. Identifying urban infrastructure multi-hazard risk in developing country contexts

    NASA Astrophysics Data System (ADS)

    Taylor, Faith; Malamud, Bruce; Millington, James

    2017-04-01

    This work presents a method to coarsely zone urban areas into different infrastructure typologies, from which physical vulnerability to a range of natural hazards and multi-hazard interactions can be estimated, particularly for developing country contexts where access to data can be a challenge. This work builds upon techniques developed for urban micrometeorology for classifying 12 urban typologies (Stewart and Oke, 2011) using Landsat 8 30 m × 30 m remote sensing imagery (Betchel et al., 2015). For each of these 12 urban typologies, we develop general rules about the presence, type and level of service of 10 broad categories of infrastructure (including buildings, roads, electricity and water), which we refer to as 'urban textures'. We have developed and applied this technique to five urban areas varying in size and structure across Africa: Nairobi (Kenya); Karonga (Malawi); Mzuzu (Malawi); Ibadan (Nigeria) and Cape Town (South Africa). For each urban area, a training dataset of 10 samples of each of the 12 urban texture classes is digitised using Google Earth imagery. A random forest classification is performed using SAGA GIS, resulting in a map of different urban typologies for each city. Based on >1200 georeferenced field photographs and expert interviews for Karonga (Malawi) and Nairobi (Kenya), generally applicable rules about the presence, type and level of service of 12 infrastructure types (the 'urban texture') are developed for each urban typology. For each urban texture, we are broadly reviewing how each infrastructure might be physically impacted by 21 different natural hazards and hazard interactions. This can aid local stakeholders such as emergency responders and urban planners to systematically identify how the infrastructure in different parts of an urban area might be affected differently during a natural disaster event.

  2. A Constructive Approach to Infrastructure: Infrastructure "Breakdowns" and the Cultivation of Rhetorical Wisdom

    ERIC Educational Resources Information Center

    Clifton, Jennifer; Loveridge, Jordan; Long, Elenore

    2016-01-01

    It is not typically the bent of infrastructure to be continually responsive in a way that is expansive and inclusive; instead, for newcomers or those with alternative histories, aims, vision, values, and perspectives, the inertia of infrastructure is more likely to be experienced as infrastructural breakdowns. We ask: "What might wisdom look…

  3. Assessment of a Solar Cell Panel Spatial Arrangement Influence on Electricity Generation

    NASA Astrophysics Data System (ADS)

    Anisimov, I. A.; Burakova, L. N.; Burakova, A. D.; Burakova, O. D.

    2017-05-01

    The research evaluates the impact of the spatial arrangement of solar cell panels on the amount of electricity generated (power generated by solar cell panel) in Tyumen. Dependences of the power generated by the solar panel on the time of day, air temperature, weather conditions and the spatial arrangement are studied. Formulas for the calculation of the solar cell panel inclination angle which provides electricity to urban infrastructure are offered. Based on the data in the future, changing of inclination angle of solar cell panel will be confirmed experimentally during the year in Tyumen, and recommendations for installing solar cell panels in urban infrastructure will be developed.

  4. Smart Valley Infrastructure.

    ERIC Educational Resources Information Center

    Maule, R. William

    1994-01-01

    Discusses prototype information infrastructure projects in northern California's Silicon Valley. The strategies of the public and private telecommunications carriers vying for backbone services and industries developing end-user infrastructure technologies via office networks, set-top box networks, Internet multimedia, and "smart homes"…

  5. Optimal control of diarrhea transmission in a flood evacuation zone

    NASA Astrophysics Data System (ADS)

    Erwina, N.; Aldila, D.; Soewono, E.

    2014-03-01

    Evacuation of residents and diarrhea disease outbreak in evacuation zone have become serious problem that frequently happened during flood periods. Limited clean water supply and infrastructure in evacuation zone contribute to a critical spread of diarrhea. Transmission of diarrhea disease can be reduced by controlling clean water supply and treating diarrhea patients properly. These treatments require significant amount of budget, which may not be fulfilled in the fields. In his paper, transmission of diarrhea disease in evacuation zone using SIRS model is presented as control optimum problem with clean water supply and rate of treated patients as input controls. Existence and stability of equilibrium points and sensitivity analysis are investigated analytically for constant input controls. Optimum clean water supply and rate of treatment are found using optimum control technique. Optimal results for transmission of diarrhea and the corresponding controls during the period of observation are simulated numerically. The optimum result shows that transmission of diarrhea disease can be controlled with proper combination of water supply and rate of treatment within allowable budget.

  6. Understanding the Uncertainties in Consequences of Climate Change for the United States Power Sector Infrastructure when Considering a Realistic Mitigation Pace and Adaptation Needs.

    NASA Astrophysics Data System (ADS)

    Anderson, N. J.; Whiteford, E. J.; Jones, V.; Fritz, S. C.; Yang, H.; Appleby, P.; Bindler, R.

    2014-12-01

    In order to overcome the potential damages associated with climate change, a massive reduction in greenhouse gas emissions is necessary. Achieving these levels of emissions reductions will require dramatic changes in the U.S. electricity generating infrastructure: almost all of the fossil-generation fleet will need to be replaced with low-carbon sources and society would have to maintain a high build rate of new capacity for decades. Because the build rate of new electricity generating capacity may be limited, the timing of regulation is critical—the longer the U.S. waits to start reducing emissions, the faster the turnover in the electricity sector must occur in order to meet the same target. We investigate the relationship between climate policy timing and infrastructure turnover in the electricity sector. How long can we wait before constraints on infrastructure turnover in the electricity sector make achieving our climate goals impossible? We show that delaying climate change policy increases average construction rates by 25% to 85% and increases maximum construction rates by 50% to 300%. We also show that delaying climate policy has little effect on the age of retired plants or the stranded costs associated with premature retirement. We show that as we delay policy action, some goals won't be possible for attain. For example, unless we enable emissions reductions today, reducing cumulative emissions between now and 2040 by 50% when compared to a no-policy scenario is not possible.

  7. The impact of electric vehicles on the outlook of future energy system

    NASA Astrophysics Data System (ADS)

    Zhuk, A.; Buzoverov, E.

    2018-02-01

    Active promotion of electric vehicles (EVs) and technology of fast EV charging in the medium term may cause significant peak loads on the energy system, what necessitates making strategic decisions related to the development of generating capacities, distribution networks with EV charging infrastructure, and priorities in the development of battery electric vehicles and vehicles with electrochemical generators. The paper analyses one of the most significant aspects of joint development of electric transport system and energy system in the conditions of substantial growth of energy consumption by EVs. The assessments of per-unit-costs of operation and depreciation of EV power unit were made, taking into consideration the expenses of electric power supply. The calculations show that the choice of electricity buffering method for EV fast charging depends on the character of electricity infrastructure in the region where the electric transport is operating. In the conditions of high density of electricity network and a large number of EVs, the stationary storage facilities or the technology of distributed energy storage in EV batteries - vehicle-to-grid (V2G) technology may be used for buffering. In the conditions of low density and low capacity of electricity networks, the most economical solution could be usage of EVs with traction power units based on the combination of air-aluminum electrochemical generator and a buffer battery of small capacity.

  8. Operational models of infrastructure resilience.

    PubMed

    Alderson, David L; Brown, Gerald G; Carlyle, W Matthew

    2015-04-01

    We propose a definition of infrastructure resilience that is tied to the operation (or function) of an infrastructure as a system of interacting components and that can be objectively evaluated using quantitative models. Specifically, for any particular system, we use quantitative models of system operation to represent the decisions of an infrastructure operator who guides the behavior of the system as a whole, even in the presence of disruptions. Modeling infrastructure operation in this way makes it possible to systematically evaluate the consequences associated with the loss of infrastructure components, and leads to a precise notion of "operational resilience" that facilitates model verification, validation, and reproducible results. Using a simple example of a notional infrastructure, we demonstrate how to use these models for (1) assessing the operational resilience of an infrastructure system, (2) identifying critical vulnerabilities that threaten its continued function, and (3) advising policymakers on investments to improve resilience. © 2014 Society for Risk Analysis.

  9. Project FOOTPRINT: Substation modeling and simulations for E1 pulses

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nelson, Scott D.; Larson, D. J.; Kirkendall, B. A.

    This report includes a presentation with an: Introduction to CW coupling; Introduction to single-pulse coupling; Description of E1 waveforms; Structures in a substation yard --articulated (as part of the substation's defined electrical functionality)--unarticulated (not as part of the substation's defined electrical functionality); Coupling --electrical coupling (capacitive coupling) --magnetic coupling (inductive coupling); Connectivity to long-line transmission lines; Control infrastructure; Summary; and References.

  10. Transmission dispatch and congestion management in open market systems

    NASA Astrophysics Data System (ADS)

    Fang, Risheng

    This thesis is located in the domain of electricity supply industry restructuring. It deals with emerging issues, whose understanding is essential to advancing knowledge of open access transmission theory and proceeds to develop approaches for solving the transmission dispatch and congestion management problem. An overview of current trends and experiences in utility restructuring and the main models for restructuring, as well as the classifications of system operators, is first presented. A fully unbundled competitive electricity market model, called the bilateral/multilateral trades model, is then developed. A survey of current research in transmission dispatch and congestion management is included with discussion of transmission capacity and ancillary services. A methodology for the power dispatch problem in a structure dominated by bilateral and multilateral transmission contracts is presented. Group structures are mathematically formulated and explored and three basic types of curtailment strategies proposed for use by market participants. A more complex model is then developed, which takes into account the co-existence of bilateral and multilateral contracts with pool type dynamic supplies and demands based on bids and market clearing prices. An integrated dispatch strategy to reconcile all three types of transactions (bilateral, multilateral and pool) is then developed. Prioritization of electricity transactions and related curtailment strategies are explored and a mechanism for coordination between market participants to achieve additional economic advantages is described. A theory of security based rescheduling is presented in order to investigate the security-related aspects of operation in an unbundled and deregulated system. The impact of post-contingency corrective capability on optimal rescheduling results has been identified and the advantage of incorporating post-contingency corrective rescheduling into the objective function demonstrated. Finally

  11. A high-transmission liquid-crystal Fabry-Perot infrared filter for electrically tunable spectral imaging detection

    NASA Astrophysics Data System (ADS)

    Liu, Zhonglun; Xin, Zhaowei; Long, Huabao; Wei, Dong; Dai, Wanwan; Zhang, Xinyu; Wang, Haiwei; Xie, Changsheng

    2018-02-01

    Previous studies have presented the usefulness of typical liquid-crystal Fabry-Perot (LC-FP) infrared filters for spectral imaging detection. Yet, their infrared transmission performances still remain to improve or even rise. In this paper, we propose a new type of electrically tunable LC-FP infrared filter to solve the problem above. The key component of the device is a FP resonant cavity composed of two parallel plane mirrors, in which the zinc selenide (ZnSe) materials with a very high transmittance in the mid-long-wavelength infrared regions are used as the electrode substrates and a layer of nano-aluminum (Al) film, which is directly contacted with liquid-crystal materials, is chosen to make high reflective mirrors as well as the electrodes. Particularly, it should be noted that the directional layer made up of ployimide (PI) used previously is removed. The experiment results indicate that the filter can reduce the absorption of infrared wave remarkably, and thus highlight a road to effectively improve the infrared transmittance ability.

  12. Green Infrastructure 101

    EPA Science Inventory

    Green Infrastructure 101 • What is it? What does it do? What doesn’t it do? • Green Infrastructure as a stormwater and combined sewer control • GI Controls and Best Management Practices that make sense for Yonkers o (Include operations and maintenance requirements for each)

  13. Environmental and natural resource implications of sustainable urban infrastructure systems

    NASA Astrophysics Data System (ADS)

    Bergesen, Joseph D.; Suh, Sangwon; Baynes, Timothy M.; Kaviti Musango, Josephine

    2017-12-01

    As cities grow, their environmental and natural resource footprints also tend to grow to keep up with the increasing demand on essential urban services such as passenger transportation, commercial space, and thermal comfort. The urban infrastructure systems, or socio-technical systems providing these services are the major conduits through which natural resources are consumed and environmental impacts are generated. This paper aims to gauge the potential reductions in environmental and resources footprints through urban transformation, including the deployment of resource-efficient socio-technical systems and strategic densification. Using hybrid life cycle assessment approach combined with scenarios, we analyzed the greenhouse gas (GHG) emissions, water use, metal consumption and land use of selected socio-technical systems in 84 cities from the present to 2050. The socio-technical systems analyzed are: (1) bus rapid transit with electric buses, (2) green commercial buildings, and (3) district energy. We developed a baseline model for each city considering gross domestic product, population density, and climate conditions. Then, we overlaid three scenarios on top of the baseline model: (1) decarbonization of electricity, (2) aggressive deployment of resource-efficient socio-technical systems, and (3) strategic urban densification scenarios to each city and quantified their potentials in reducing the environmental and resource impacts of cities by 2050. The results show that, under the baseline scenario, the environmental and natural resource footprints of all 84 cities combined would increase 58%-116% by 2050. The resource-efficient scenario along with strategic densification, however, has the potential to curve down GHG emissions to 17% below the 2010 level in 2050. Such transformation can also limit the increase in all resource footprints to less than 23% relative to 2010. This analysis suggests that resource-efficient urban infrastructure and decarbonization of

  14. Integrating smart container technology into existing shipping and law enforcement infrastructure

    NASA Astrophysics Data System (ADS)

    Ferriere, Dale; Pysareva, Khrystyna; Rucinski, Andrzej

    2006-05-01

    While there has been important research and development in the area of smart container technologies, no system design methodologies have yet emerged for integrating this technology into the existing shipping and law enforcement infrastructure. A successful deployment of smart containers requires a precise understanding of how to integrate this new technology into the existing shipping and law enforcement infrastructure, how to establish communication interoperability, and how to establish procedures and protocols related to the operation of smart containers. In addition, this integration needs to be seamless, unobtrusive to commerce, and cost-effective. In order to address these issues, we need to answer the following series of questions: 1) Who will own and operate the smart container technology; 2) Who will be responsible for monitoring the smart container data and notifying first responders; 3) What communication technologies currently used by first responders might be adopted for smart container data transmission; and 4) How will existing cargo manifest data be integrated into smart container data. In short, we need to identify the best practices for smart container ownership and operation. In order to help provide answers to these questions, we have surveyed a sample group of representatives from law enforcement, first responder, regulatory, and private sector organizations. This paper presents smart container infrastructure best practices recommendations obtained from the results of the survey.

  15. Space Transportation Infrastructure Supported By Propellant Depots

    NASA Technical Reports Server (NTRS)

    Smitherman, David; Woodcock, Gordon

    2011-01-01

    A space transportation infrastructure is described that utilizes propellant depots to support all foreseeable missions in the Earth-Moon vicinity and deep space out to Mars. The infrastructure utilizes current expendable launch vehicles such as the Delta IV Heavy, Atlas V, and Falcon 9, for all crew, cargo, and propellant launches to orbit. Propellant launches are made to a Low-Earth-Orbit (LEO) Depot and an Earth-Moon Lagrange Point 1 (L1) Depot to support new reusable in-space transportation vehicles. The LEO Depot supports missions to Geosynchronous Earth Orbit (GEO) for satellite servicing, and to L1 for L1 Depot missions. The L1 Depot supports Lunar, Earth-Sun L2 (ESL2), Asteroid, and Mars missions. A Mars Orbital Depot is also described to support ongoing Mars missions. New concepts for vehicle designs are presented that can be launched on current 5-meter diameter expendable launch vehicles. These new reusable vehicle concepts include a LEO Depot, L1 Depot, and Mars Orbital Depot based on International Space Station (ISS) heritage hardware. The high-energy depots at L1 and Mars orbit are compatible with, but do not require, electric propulsion tug use for propellant and/or cargo delivery. New reusable in-space crew transportation vehicles include a Crew Transfer Vehicle (CTV) for crew transportation between the LEO Depot and the L1 Depot, a new reusable Lunar Lander for crew transportation between the L1 Depot and the lunar surface, and a Deep Space Habitat (DSH) to support crew missions from the L1 Depot to ESL2, Asteroid, and Mars destinations. A 6 meter diameter Mars lander concept is presented that can be launched without a fairing based on the Delta IV heavy Payload Planners Guide, which indicates feasibility of a 6.5 meter fairing. This lander would evolve to re-usable operations when propellant production is established on Mars. Figure 1 provides a summary of the possible missions this infrastructure can support. Summary mission profiles are presented

  16. States of Cybersecurity: Electricity Distribution System Discussions

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pena, Ivonne; Ingram, Michael; Martin, Maurice

    State and local entities that oversee the reliable, affordable provision of electricity are faced with growing and evolving threats from cybersecurity risks to our nation's electricity distribution system. All-hazards system resilience is a shared responsibility among electric utilities and their regulators or policy-setting boards of directors. Cybersecurity presents new challenges and should be a focus for states, local governments, and Native American tribes that are developing energy-assurance plans to protect critical infrastructure. This research sought to investigate the implementation of governance and policy at the distribution utility level that facilitates cybersecurity preparedness to inform the U.S. Department of Energy (DOE),more » Office of Energy Policy and Systems Analysis; states; local governments; and other stakeholders on the challenges, gaps, and opportunities that may exist for future analysis. The need is urgent to identify the challenges and inconsistencies in how cybersecurity practices are being applied across the United States to inform the development of best practices, mitigations, and future research and development investments in securing the electricity infrastructure. By examining the current practices and applications of cybersecurity preparedness, this report seeks to identify the challenges and persistent gaps between policy and execution and reflect the underlying motivations of distinct utility structures as they play out at the local level. This study aims to create an initial baseline of cybersecurity preparedness within the distribution electricity sector. The focus of this study is on distribution utilities not bound by the cybersecurity guidelines of the North American Electric Reliability Corporation (NERC) to examine the range of mechanisms taken by state regulators, city councils that own municipal utilities, and boards of directors of rural cooperatives.« less

  17. Venezuela 2000 restructures its electric power sector to ensure competitiveness

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Alvarez, C.E.

    1999-11-01

    Today, it is well known that the countries that are best equipped to develop their production are not those with the most natural resources but those who have the best trained people, most technical resources and that base their development on competitiveness. The State model is, definitely, not one that offers the greatest advantages, and Venezuela is an example of this. Even when, thanks to the economic boom the country enjoyed in the 70s and 80s, it was able to cost the investments required to develop its infrastructure and to prepare a first class human contingent, over the long term,more » competition was discouraged and waste encouraged. The result was that, even when Venezuela had vast economic resources compared to its relatively small population, it was not able to become the exception to the rule and succeed in applying this model--now considered obsolete in many countries--indefinitely. Another model based on private ownership has begun to take its place, one that has made it possible to cost the increasingly large investments required, involves opening up these sectors to private capital, and uses the phenomenon of globalization--a major driving force behind competition and one that has wrought considerable change in all corners of the increasingly smaller planet. This paper describes the steps that different sectors in the country have been taking to implement this new model in the electric power sector, such as developing draft legislation for regulating the Sector, very shortly to culminate in the passing of an electric power law by Congress; opening up the Sector to private investors (privatization); dividing the electric power industry into four business units (generation, transmission, distribution and marketing); the electric power market; and other innovations currently being implemented.« less

  18. Systematic risk assessment methodology for critical infrastructure elements - Oil and Gas subsectors

    NASA Astrophysics Data System (ADS)

    Gheorghiu, A.-D.; Ozunu, A.

    2012-04-01

    The concern for the protection of critical infrastructure has been rapidly growing in the last few years in Europe. The level of knowledge and preparedness in this field is beginning to develop in a lawfully organized manner, for the identification and designation of critical infrastructure elements of national and European interest. Oil and gas production, refining, treatment, storage and transmission by pipelines facilities, are considered European critical infrastructure sectors, as per Annex I of the Council Directive 2008/114/EC of 8 December 2008 on the identification and designation of European critical infrastructures and the assessment of the need to improve their protection. Besides identifying European and national critical infrastructure elements, member states also need to perform a risk analysis for these infrastructure items, as stated in Annex II of the above mentioned Directive. In the field of risk assessment, there are a series of acknowledged and successfully used methods in the world, but not all hazard identification and assessment methods and techniques are suitable for a given site, situation, or type of hazard. As Theoharidou, M. et al. noted (Theoharidou, M., P. Kotzanikolaou, and D. Gritzalis 2009. Risk-Based Criticality Analysis. In Critical Infrastructure Protection III. Proceedings. Third Annual IFIP WG 11.10 International Conference on Critical Infrastructure Protection. Hanover, New Hampshire, USA, March 23-25, 2009: revised selected papers, edited by C. Palmer and S. Shenoi, 35-49. Berlin: Springer.), despite the wealth of knowledge already created, there is a need for simple, feasible, and standardized criticality analyses. The proposed systematic risk assessment methodology includes three basic steps: the first step (preliminary analysis) includes the identification of hazards (including possible natural hazards) for each installation/section within a given site, followed by a criterial analysis and then a detailed analysis step

  19. Climate and Water Vulnerability of the US Electricity Grid Under High Penetrations of Renewable Energy

    NASA Astrophysics Data System (ADS)

    Macknick, J.; Miara, A.; O'Connell, M.; Vorosmarty, C. J.; Newmark, R. L.

    2017-12-01

    The US power sector is highly dependent upon water resources for reliable operations, primarily for thermoelectric cooling and hydropower technologies. Changes in the availability and temperature of water resources can limit electricity generation and cause outages at power plants, which substantially affect grid-level operational decisions. While the effects of water variability and climate changes on individual power plants are well documented, prior studies have not identified the significance of these impacts at the regional systems-level at which the grid operates, including whether there are risks for large-scale blackouts, brownouts, or increases in production costs. Adequately assessing electric grid system-level impacts requires detailed power sector modeling tools that can incorporate electric transmission infrastructure, capacity reserves, and other grid characteristics. Here, we present for the first time, a study of how climate and water variability affect operations of the power sector, considering different electricity sector configurations (low vs. high renewable) and environmental regulations. We use a case study of the US Eastern Interconnection, building off the Eastern Renewable Generation Integration Study (ERGIS) that explored operational challenges of high penetrations of renewable energy on the grid. We evaluate climate-water constraints on individual power plants, using the Thermoelectric Power and Thermal Pollution (TP2M) model coupled with the PLEXOS electricity production cost model, in the context of broader electricity grid operations. Using a five minute time step for future years, we analyze scenarios of 10% to 30% renewable energy penetration along with considerations of river temperature regulations to compare the cost, performance, and reliability tradeoffs of water-dependent thermoelectric generation and variable renewable energy technologies under climate stresses. This work provides novel insights into the resilience and

  20. Optimizing the U.S. Electric System with a High Penetration of Renewables

    NASA Astrophysics Data System (ADS)

    Corcoran, B. A.; Jacobson, M. Z.

    2012-12-01

    As renewable energy generators are increasingly being installed throughout the U.S., there is growing interest in interconnecting diverse renewable generators (primarily wind and solar) across large geographic areas through an enhanced transmission system. This reduces variability in the aggregate power output, increases system reliability, and allows for the development of the best overall group of renewable technologies and sites to meet the load. Studies are therefore needed to determine the most efficient and economical plan to achieve large area interconnections in a future electric system with a high penetration of renewables. This research quantifies the effects of aggregating electric load and, separately, electric load together with diverse renewable generation throughout the ten Federal Energy Regulatory Commission (FERC) regions in the contiguous U.S. The effects of aggregating electric load alone -- including generator capacity capital cost savings, load energy shift operating cost savings, reserve requirement cost savings, and transmission costs -- were calculated for various groupings of FERC regions using 2006 data. Transmission costs outweighed cost savings due to aggregation in nearly all cases. East-west transmission layouts had the highest overall cost, and interconnecting ERCOT to adjacent FERC regions resulted in increased costs, both due to limited existing transmission capacity. Scenarios consisting of smaller aggregation groupings had the lowest overall cost. This analysis found no economic case for further aggregation of load alone within the U.S., except possibly in the West and Northwest. If aggregation of electric load is desired, then small, regional consolidations yield the lowest overall system cost. Next, the effects of aggregating electric load together with renewable electricity generation are being quantified through the development and use of an optimization tool in AMPL (A Mathematical Programming Language). This deterministic

  1. The future of infrastructure security :

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Garcia, Pablo; Turnley, Jessica Glicken; Parrott, Lori K.

    2013-05-01

    Sandia National Laboratories hosted a workshop on the future of infrastructure security on February 27-28, 2013, in Albuquerque, NM. The 17 participants came from backgrounds as diverse as federal policy, the insurance industry, infrastructure management, and technology development. The purpose of the workshop was to surface key issues, identify directions forward, and lay groundwork for cross-sectoral and cross-disciplinary collaborations. The workshop addressed issues such as the problem space (what is included in infrastructure problems?), the general types of threats to infrastructure (such as acute or chronic, system-inherent or exogenously imposed) and definitions of secure and resilient infrastructures. The workshop concludedmore » with a consideration of stakeholders and players in the infrastructure world, and identification of specific activities that could be undertaken by the Department of Homeland Security (DHS) and other players.« less

  2. Wind Powering America: The Next Steps in North Carolina

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Banks, Jennifer L.; Scanlin, Dennis; Quinlan, Paul

    2013-06-18

    The goal of this project is to apply the WPA’s proactive outreach strategy to the problem of educating the public about the likely transmission infrastructure developments concomitant to the significant development of wind energy resources in North Carolina. Given the lead time to develop significant new transmission infrastructure (5-10 years), it is critical to begin this outreach work today, so that wind resources can be developed to adequately meet the 20% by 2030 goal in the mid- to long-term (10-20 years). The project team planned to develop a transmission infrastructure outreach campaign for North Carolina by: (1) convening a utilitymore » interest group (UIG) of the North Carolina Wind Working Group (NC WWG) consisting of electric utilities in the state and the Southeast; and (2) expanding outreach to local and state government officials in North Carolina.« less

  3. Cap-and-Trade Modeling and Analysis: Congested Electricity Market Equilibrium

    NASA Astrophysics Data System (ADS)

    Limpaitoon, Tanachai

    This dissertation presents an equilibrium framework for analyzing the impact of cap-and-trade regulation on transmission-constrained electricity market. The cap-and-trade regulation of greenhouse gas emissions has gained momentum in the past decade. The impact of the regulation and its efficacy in the electric power industry depend on interactions of demand elasticity, transmission network, market structure, and strategic behavior of firms. I develop an equilibrium model of an oligopoly electricity market in conjunction with a market for tradable emissions permits to study the implications of such interactions. My goal is to identify inefficiencies that may arise from policy design elements and to avoid any unintended adverse consequences on the electric power sector. I demonstrate this modeling framework with three case studies examining the impact of carbon cap-and-trade regulation. In the first case study, I study equilibrium results under various scenarios of resource ownership and emission targets using a 24-bus IEEE electric transmission system. The second and third case studies apply the equilibrium model to a realistic electricity market, Western Electricity Coordinating Council (WECC) 225-bus system with a detailed representation of the California market. In the first and second case studies, I examine oligopoly in electricity with perfect competition in the permit market. I find that under a stringent emission cap and a high degree of concentration of non-polluting firms, the electricity market is subject to potential abuses of market power. Also, market power can occur in the procurement of non-polluting energy through the permit market when non-polluting resources are geographically concentrated in a transmission-constrained market. In the third case study, I relax the competitive market structure assumption of the permit market by allowing oligopolistic competition in the market through a conjectural variation approach. A short-term equilibrium

  4. Comprehensive evaluation of power grid enterprises' credit rating under the reform of transmission and distribution price

    NASA Astrophysics Data System (ADS)

    Wang, Yongli; Wang, Gang; Zuo, Yi; Fan, Lisha; Wei, Jiaxiang

    2017-03-01

    On March 15, 2015, the central office issued the "Opinions on Further Deepening the Reform of Electric Power System" (in the 2015 No. 9). This policy marks the central government officially opened a new round of electricity reform. As a programmatic document under the new situation to comprehensively promote the reform of the power system, No. 9 document will be approved as a separate transmission and distribution of electricity prices, which is the first task of promoting the reform of the power system. Grid tariff reform is not only the transmission and distribution price of a separate approval, more of the grid company input-output relationship and many other aspects of deep-level adjustments. Under the background of the reform of the transmission and distribution price, the main factors affecting the input-output relationship, such as the main business, electricity pricing, and investment approval, financial accounting and so on, have changed significantly. The paper designed the comprehensive evaluation index system of power grid enterprises' credit rating under the reform of transmission and distribution price to reduce the impact of the reform on the company's international rating results and the ability to raise funds.

  5. Comprehensive evaluation of power grid projects' investment benefits under the reform of transmission and distribution price

    NASA Astrophysics Data System (ADS)

    Wang, Yongli; Wang, Gang; Zuo, Yi; Fan, Lisha; Ling, Yunpeng

    2017-03-01

    On March 15, 2015, the Central Office issued the "Opinions on Further Deepening the Reform of Electric Power System" (Zhong Fa No. 9). This policy marks the central government officially opened a new round of electricity reform. As a programmatic document under the new situation to comprehensively promote the reform of the power system, No. 9 document will be approved as a separate transmission and distribution of electricity prices, which is the first task of promoting the reform of the power system. Grid tariff reform is not only the transmission and distribution price of a separate approval, more of the grid company input-output relationship and many other aspects of deep-level adjustments. Under the background of the reform of the transmission and distribution price, the main factors affecting the input-output relationship, such as the main business, electricity pricing, and investment approval, financial accounting and so on, have changed significantly. The paper designed the comprehensive evaluation index system of power grid projects' investment benefits under the reform of transmission and distribution price to improve the investment efficiency of power grid projects after the power reform in China.

  6. 77 FR 30589 - SteelRiver Infrastructure Partners LP, SteelRiver Infrastructure Associates LLC, SteelRiver...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-23

    ... DEPARTMENT OF TRANSPORTATION Surface Transportation Board [Docket No. FD 35622] SteelRiver Infrastructure Partners LP, SteelRiver Infrastructure Associates LLC, SteelRiver Infrastructure Fund North America LP, and Patriot Funding LLC--Control Exemption--Patriot Rail Corp., et al. SteelRiver...

  7. Cultured Construction: Global Evidence of the Impact of National Values on Renewable Electricity Infrastructure Choice.

    PubMed

    Kaminsky, Jessica A

    2016-02-16

    Renewable electricity is an important tool in the fight against climate change, but globally these technologies are still in the early stages of diffusion. To contribute to our understanding of the factors driving this diffusion, I study relationships between national values (measured by Hofstede's cultural dimensions) and renewable electricity adoption at the national level. Existing data for 66 nations (representing an equal number of developed and developing economies) are used to fuel the analysis. Somewhat dependent on limited available data on controls for grid reliability and the cost of electricity, I discover that three of Hofstede's dimensions (high uncertainty avoidance, low masculinity-femininity, and high individualism-collectivism) have significant exponential relationships with renewable electricity adoption. The dimension of uncertainty avoidance appears particularly appropriate for practical application. Projects or organizations implementing renewable electricity policy, designs, or construction should particularly attend to this cultural dimension. In particular, as the data imply that renewable technologies are being used to manage risk in electricity supply, geographies with unreliable grids are particularly likely to be open to renewable electricity technologies.

  8. Some Little-Known Facts about Transmission Lines and Some New Results

    ERIC Educational Resources Information Center

    Dutta Roy, Suhash C.

    2010-01-01

    The study of transmission lines forms an integral part of any curriculum in electrical engineering. This paper presents some little-known but interesting facts about transmission lines, which are generally not found in textbooks, along with some new facts, which arose as extensions of these little-known ones. The facts highlighted in this paper…

  9. Valuation of Electric Power System Services and Technologies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kintner-Meyer, Michael C. W.; Homer, Juliet S.; Balducci, Patrick J.

    Accurate valuation of existing and new technologies and grid services has been recognized to be important to stimulate investment in grid modernization. Clear, transparent, and accepted methods for estimating the total value (i.e., total benefits minus cost) of grid technologies and services are necessary for decision makers to make informed decisions. This applies to home owners interested in distributed energy technologies, as well as to service providers offering new demand response services, and utility executives evaluating best investment strategies to meet their service obligation. However, current valuation methods lack consistency, methodological rigor, and often the capabilities to identify and quantifymore » multiple benefits of grid assets or new and innovative services. Distributed grid assets often have multiple benefits that are difficult to quantify because of the locational context in which they operate. The value is temporally, operationally, and spatially specific. It varies widely by distribution systems, transmission network topology, and the composition of the generation mix. The Electric Power Research Institute (EPRI) recently established a benefit-cost framework that proposes a process for estimating multiple benefits of distributed energy resources (DERs) and the associated cost. This document proposes an extension of this endeavor that offers a generalizable framework for valuation that quantifies the broad set of values for a wide range of technologies (including energy efficiency options, distributed resources, transmission, and generation) as well as policy options that affect all aspects of the entire generation and delivery system of the electricity infrastructure. The extension includes a comprehensive valuation framework of monetizable and non-monetizable benefits of new technologies and services beyond the traditional reliability objectives. The benefits are characterized into the following categories: sustainability

  10. Ancillary-service costs for 12 US electric utilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kirby, B.; Hirst, E.

    1996-03-01

    Ancillary services are those functions performed by electrical generating, transmission, system-control, and distribution-system equipment and people to support the basic services of generating capacity, energy supply, and power delivery. The Federal Energy Regulatory Commission defined ancillary services as ``those services necessary to support the transmission of electric power from seller to purchaser given the obligations of control areas and transmitting utilities within those control areas to maintain reliable operations of the interconnected transmission system.`` FERC divided these services into three categories: ``actions taken to effect the transaction (such as scheduling and dispatching services) , services that are necessary to maintainmore » the integrity of the transmission system [and] services needed to correct for the effects associated with undertaking a transaction.`` In March 1995, FERC published a proposed rule to ensure open and comparable access to transmission networks throughout the country. The rule defined six ancillary services and developed pro forma tariffs for these services: scheduling and dispatch, load following, system protection, energy imbalance, loss compensation, and reactive power/voltage control.« less

  11. Making green infrastructure healthier infrastructure.

    PubMed

    Lõhmus, Mare; Balbus, John

    2015-01-01

    Increasing urban green and blue structure is often pointed out to be critical for sustainable development and climate change adaptation, which has led to the rapid expansion of greening activities in cities throughout the world. This process is likely to have a direct impact on the citizens' quality of life and public health. However, alongside numerous benefits, green and blue infrastructure also has the potential to create unexpected, undesirable, side-effects for health. This paper considers several potential harmful public health effects that might result from increased urban biodiversity, urban bodies of water, and urban tree cover projects. It does so with the intent of improving awareness and motivating preventive measures when designing and initiating such projects. Although biodiversity has been found to be associated with physiological benefits for humans in several studies, efforts to increase the biodiversity of urban environments may also promote the introduction and survival of vector or host organisms for infectious pathogens with resulting spread of a variety of diseases. In addition, more green connectivity in urban areas may potentiate the role of rats and ticks in the spread of infectious diseases. Bodies of water and wetlands play a crucial role in the urban climate adaptation and mitigation process. However, they also provide habitats for mosquitoes and toxic algal blooms. Finally, increasing urban green space may also adversely affect citizens allergic to pollen. Increased awareness of the potential hazards of urban green and blue infrastructure should not be a reason to stop or scale back projects. Instead, incorporating public health awareness and interventions into urban planning at the earliest stages can help insure that green and blue infrastructure achieves full potential for health promotion.

  12. The electric field change caused by a ground flash with multiple channels

    NASA Technical Reports Server (NTRS)

    Nakano, Minoru; Takagi, Nobuyuki; Arima, Izumi; Kawasaki, Zen-Ichiro; Takeuti, Tosio

    1991-01-01

    The electric field and the magnetic flux changes caused by a ground flash with multiple channels are measured near the electric power transmission lines during winter thunderstorms. Triggered lightning strokes and the following associated strokes to the transmission line towers produce characteristic waveforms of the field changes. A few examples of the waveforms and a brief discussion are given.

  13. Characterization of complementary electric field coupled resonant surfaces

    NASA Astrophysics Data System (ADS)

    Hand, Thomas H.; Gollub, Jonah; Sajuyigbe, Soji; Smith, David R.; Cummer, Steven A.

    2008-11-01

    We present angle-resolved free-space transmission and reflection measurements of a surface composed of complementary electric inductive-capacitive (CELC) resonators. By measuring the reflection and transmission coefficients of a CELC surface with different polarizations and particle orientations, we show that the CELC only responds to in-plane magnetic fields. This confirms the Babinet particle duality between the CELC and its complement, the electric field coupled LC resonator. Characterization of the CELC structure serves to expand the current library of resonant elements metamaterial designers can draw upon to make unique materials and surfaces.

  14. Electric and hybrid vehicles

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jacovides, L.J.; Cornell, E.P.; Kirk, R.

    1981-01-01

    A study of the energy utilization of gasoline and battery-electric powered special purpose vehicles is discussed along with the impact of electric cars on national energy consumption, the development of electric vehicles in Japan, the applicability of safety standards to electric and hybrid-vehicles, and crashworthiness tests on two electric vehicles. Aspects of energy storage are explored, taking into account a review of battery systems for electrically powered vehicles, the dynamic characterization of lead-acid batteries for vehicle applications, nickel-zinc storage batteries as energy sources for electric vehicles, and a high energy tubular battery for a 1800 kg payload electric delivery van.more » Subjects considered in connection with drive systems include the drive system of the DOE near-term electric vehicle, a high performance AC electric drive system, an electromechanical transmission for hybrid vehicle power trains, and a hybrid vehicle for fuel economy. Questions of vehicle development are examined, giving attention to the Electrovair electric car, special purpose urban cars, the system design of the electric test vehicle, a project for city center transport, and a digital computer program for simulating electric vehicle performance.« less

  15. The Role of State and Local Jurisdictions in Identifying and Protecting Critical Infrastructure

    DTIC Science & Technology

    2013-12-01

    economic security, public health or safety, or any combination thereof.”22 This definition amended to include intentional acts as a result of the...operators, associations, and other entities—both large and small —within a sector. U.S. Department of Homeland Security, National Infrastructure...fossil fuels (coal, natural gas or oil).122 A 2008 inventory of the electricity subsector shows that there are: 6,413 power plants ; 30,320

  16. Bridging Climate Change Resilience and Mitigation in the Electricity Sector Through Renewable Energy and Energy Efficiency: Emerging Climate Change and Development Topics for Energy Sector Transformation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cox, Sarah L; Hotchkiss, Elizabeth L; Bilello, Daniel E

    Reliable, safe, and secure electricity is essential for economic and social development and a necessary input for many sectors of the economy. However, electricity generation and associated processes make up a significant portion of global greenhouse gas (GHG) emissions contributing to climate change. Furthermore, electricity systems are vulnerable to climate change impacts - both short-term events and changes over the longer term. This vulnerability presents both near-term and chronic challenges in providing reliable, affordable, equitable, and sustainable energy services. Within this context, developing countries face a number of challenges in the energy sector, including the need to reliably meet growingmore » electricity demand, lessen dependence on imported fuels, expand energy access, and improve stressed infrastructure for fuel supply and electricity transmission. Energy efficiency (EE) and renewable energy (RE) technical solutions described in this paper can bridge action across climate change mitigation and resilience through reducing GHG emissions and supporting electric power sector adaptation to increasing climate risk. Integrated planning approaches, also highlighted in this paper, play an integral role in bringing together mitigation and resilience action under broader frameworks. Through supporting EE and RE deployment and integrated planning approaches, unique to specific national and local circumstances, countries can design and implement policies, strategies, and sectoral plans that unite development priorities, climate change mitigation, and resilience.« less

  17. Green Infrastructure Modeling Tools

    EPA Pesticide Factsheets

    Modeling tools support planning and design decisions on a range of scales from setting a green infrastructure target for an entire watershed to designing a green infrastructure practice for a particular site.

  18. Infrastructure Survey 2011

    ERIC Educational Resources Information Center

    Group of Eight (NJ1), 2012

    2012-01-01

    In 2011, the Group of Eight (Go8) conducted a survey on the state of its buildings and infrastructure. The survey is the third Go8 Infrastructure survey, with previous surveys being conducted in 2007 and 2009. The current survey updated some of the information collected in the previous surveys. It also collated data related to aspects of the…

  19. Integrated Energy-Water Planning in the Western and Texas Interconnections

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tidwell, Vincent; Gasper, John; Goldstein, Robert

    2013-07-29

    While long-term regional electricity transmission planning has traditionally focused on cost, infrastructure utilization, and reliability, issues concerning the availability of water represent an emerging issue. Thermoelectric expansion must be considered in the context of competing demands from other water use sectors balanced with fresh and non-fresh water supplies subject to climate variability. An integrated Energy-Water Decision Support System (DSS) is being developed that will enable planners in the Western and Texas Interconnections to analyze the potential implications of water availability and cost for long-range transmission planning. The project brings together electric transmission planners (Western Electricity Coordinating Council and Electric Reliabilitymore » Council of Texas) with western water planners (Western Governors’ Association and the Western States Water Council). This paper lays out the basic framework for this integrated Energy-Water DSS.« less

  20. High Voltage Hybrid Electric Propulsion - Multilayered Functional Insulation System (MFIS) NASA-GRC

    NASA Technical Reports Server (NTRS)

    Lizcano, M.

    2017-01-01

    High power transmission cables pose a key challenge in future Hybrid Electric Propulsion Aircraft. The challenge arises in developing safe transmission lines that can withstand the unique environment found in aircraft while providing megawatts of power. High voltage AC, variable frequency cables do not currently exist and present particular electrical insulation challenges since electrical arcing and high heating are more prevalent at higher voltages and frequencies. Identifying and developing materials that maintain their dielectric properties at high voltage and frequencies is crucial.

  1. A cooperative game theory approach to transmission planning in power systems

    NASA Astrophysics Data System (ADS)

    Contreras, Javier

    The rapid restructuring of the electric power industry from a vertically integrated entity into a decentralized industry has given rise to complex problems. In particular, the transmission component of the electric power system requires new methodologies to fully capture this emerging competitive industry. Game theory models are used to model strategic interactions in a competitive environment. This thesis presents a new decentralized framework to study the transmission network expansion problem using cooperative game theory. First, the players and the rules of the game are defined. Second, a coalition formation scheme is developed. Finally, the optimized cost of expansion is allocated based on the history of the coalition formation.

  2. Climate Action Benefits: Infrastructure

    EPA Pesticide Factsheets

    This page provides background on the relationship between infrastructure and climate change and describes what the CIRA Infrastructure analyses cover. It provides links to the subsectors Bridges, Roads, Urban Drainage, and Coastal Property.

  3. Information transmission on hybrid networks

    NASA Astrophysics Data System (ADS)

    Chen, Rongbin; Cui, Wei; Pu, Cunlai; Li, Jie; Ji, Bo; Gakis, Konstantinos; Pardalos, Panos M.

    2018-01-01

    Many real-world communication networks often have hybrid nature with both fixed nodes and moving modes, such as the mobile phone networks mainly composed of fixed base stations and mobile phones. In this paper, we discuss the information transmission process on the hybrid networks with both fixed and mobile nodes. The fixed nodes (base stations) are connected as a spatial lattice on the plane forming the information-carrying backbone, while the mobile nodes (users), which are the sources and destinations of information packets, connect to their current nearest fixed nodes respectively to deliver and receive information packets. We observe the phase transition of traffic load in the hybrid network when the packet generation rate goes from below and then above a critical value, which measures the network capacity of packets delivery. We obtain the optimal speed of moving nodes leading to the maximum network capacity. We further improve the network capacity by rewiring the fixed nodes and by considering the current load of fixed nodes during packets transmission. Our purpose is to optimize the network capacity of hybrid networks from the perspective of network science, and provide some insights for the construction of future communication infrastructures.

  4. The development of network infrastructure in rural areas and problems in applying IT to the medical field.

    PubMed

    Ooe, Yosuke; Anamizu, Hiromitsu; Tatsumi, Haruyuki; Tanaka, Hiroshi

    2008-07-01

    The financial condition of the Japanese health insurance system is said to be compounded with the aging of the population. The government argues that the application of IT and networking is required in order to streamline health care services while avoiding its collapse. The Internet environment has been furnished with broadband connection and multimedia in the span of one year or shorter, and is becoming more and more convenient. It is true that the Internet is now a part of Tokyo's infrastructure along with electricity and water supply, as it is the center of politics. However, in local cities, development of the Internet environment is still insufficient. In order to use the network as a common infrastructure at health care facilities, we need to be aware of this digital divide. This study investigated the development status of network infrastructure in regional cities.

  5. AC field exposure study: human exposure to 60-Hz electric fields

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Silva, J.M.

    1985-04-01

    The objective of this study was to develop a method of estimating human exposure to the 60 Hz electric fields created by transmission lines. The Activity Systems Model simulates human activities in a variety of situations where exposure to electric fields is possible. The model combines maps of electric fields, activity maps, and experimentally determined activity factors to provide histograms of time spent in electric fields of various strengths in the course of agricultural, recreational, and domestic activities. For corroboration, the study team measured actual human exposure at locations across the United States near transmission lines ranging in voltage frommore » 115 to 1200 kV. The data were collected with a specially designed vest that measures exposure. These data demonstrate the accuracy of the exposure model presented in this report and revealed that most exposure time is spent in fields of magnitudes similar to many household situations. The report provides annual exposure estimates for human activities near transmission lines and in the home and compares them with exposure data from typical laboratory animal experiments. For one exposure index, the cumulative product of time and electric field, exposure during some of the laboratory animal experiments is two to four orders of magnitude greater than cumulative exposure for a human during one year of outdoor work on a farm crossed by a transmission line.« less

  6. Transmission Magnitude and Phase Control for Polarization-Preserving Reflectionless Metasurfaces

    NASA Astrophysics Data System (ADS)

    Kwon, Do-Hoon; Ptitcyn, Grigorii; Díaz-Rubio, Ana; Tretyakov, Sergei A.

    2018-03-01

    For transmissive applications of electromagnetic metasurfaces, an array of subwavelength Huygens' meta-atoms are typically used to eliminate reflection and achieve a high-transmission power efficiency together with a wide transmission phase coverage. We show that the underlying principle of low reflection and full control over transmission is asymmetric scattering into the specular reflection and transmission directions that results from a superposition of symmetric and antisymmetric scattering components, with Huygens' meta-atoms being one example configuration. Available for oblique illumination in TM polarization, a meta-atom configuration comprising normal and tangential electric polarizations is presented, which is capable of reflectionless, full-power transmission and a 2 π transmission phase coverage as well as full absorption. For lossy metasurfaces, we show that a complete phase coverage is still available for reflectionless designs for any value of absorptance. Numerical examples in the microwave and optical regimes are provided.

  7. Multiplex Superconducting Transmission Line for green power consolidation on a Smart Grid

    NASA Astrophysics Data System (ADS)

    McIntyre, P.; Gerity, J.; Kellams, J.; Sattarov, A.

    2017-12-01

    A multiplex superconducting transmission line (MSTL) is being developed for applications requiring interconnection of multi-MW electric power generation among a number of locations. MSTL consists of a cluster of many 2- or 3-conductor transmission lines within a coaxial cryostat envelope. Each line operates autonomously, so that the interconnection of multiple power loads can be done in a failure-tolerant network. Specifics of the electrical, mechanical, and cryogenic design are presented. The consolidation of transformation and conditioning and the failure-tolerant interconnects have the potential to offer important benefit for the green energy components of a Smart Grid.

  8. Communicating and Visualizing Erosion-associated Risks to Infrastructure

    NASA Astrophysics Data System (ADS)

    Hewett, Caspar; Simpson, Carolyn; Wainwright, John

    2016-04-01

    Soil erosion is a major problem worldwide, affecting agriculture, the natural environment and urban areas through its impact on flood risk, water quality, loss of nutrient-rich upper soil layers, eutrophication of water bodies, sedimentation of waterways and sediment-related damage to roads, buildings and infrastructure such as water, gas and electricity supply networks. This study focuses on risks to infrastructure associated with erosion and the interventions needed to reduce those risks. Deciding on what interventions to make means understanding better which parts of the landscape are most susceptible to erosion and which measures are most effective in reducing it. Effective ways of communicating mitigation strategies to stakeholders such as farmers, land managers and policy-makers are then essential if interventions are to be implemented. Drawing on the Decision-Support Matrix (DSM) approach which combines a set of hydrological principles with Participatory Action Research (PAR), a decision-support tool for Communicating and Visualizing Erosion-Associated Risks to Infrastructure (CAVERTI) was developed. The participatory component was developed with the Wear Rivers Trust, focusing on a case-study area in the North East of England. The CAVERTI tool brings together process understanding gained from modelling with knowledge and experience of a variety of stakeholders to address directly the problem of sediment transport. Development of the tool was a collaborative venture, ensuring that the problems and solutions presented are easily recognised by practitioners and decision-makers. This recognition, and ease of access via a web-based interface, in turn help to ensure that the tools get used. The web-based tool developed helps to assess, manage and improve understanding of risk from a multi-stakeholder perspective and proposes solutions to problems. We argue that visualization and communication tools co-developed by researchers and stakeholders are the best means

  9. 78 FR 59666 - Transmission Infrastructure Program; Proposed Transmission Infrastructure Program Updates and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-27

    ... Loan Programs Office into the process. The FRN also identifies the principles Western will continue using to ensure (1) that the Program is separate and distinct from Western's power marketing functions... obtain project funding. Table of Contents I. Definitions II. Principles III. Project Evaluation Criteria...

  10. 75 FR 72909 - Revision to Electric Reliability Organization Definition of Bulk Electric System

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-26

    ...) Comments 135 (b) Commission Determination 139 6. Impact on Generation Owners and Operators 142 (a) Comments... Organization, the electrical generation resources, transmission lines, interconnections with neighboring... above that interconnect with registered generation facilities are excluded from NPCC's list of bulk...

  11. Comparison of electrically driven lasers for space power transmission

    NASA Technical Reports Server (NTRS)

    Deyoung, R. J.; Lee, J. H.; Williams, M. D.; Schuster, G.; Conway, E. J.

    1988-01-01

    High-power lasers in space could provide power for a variety of future missions such as spacecraft electric power requirements and laser propulsion. This study investigates four electrically pumped laser systems, all scaled to 1-MW laser output, that could provide power to spacecraft. The four laser systems are krypton fluoride, copper vapor, laser diode array, and carbon dioxide. Each system was powered by a large solar photovoltaic array which, in turn, provided power for the appropriate laser power conditioning subsystem. Each system was block-diagrammed, and the power and efficiency were found for each subsystem block component. The copper vapor system had the lowest system efficiency (6 percent). The CO2 laser was found to be the most readily scalable but has the disadvantage of long laser wavelength.

  12. Volcanic ash impacts on critical infrastructure

    NASA Astrophysics Data System (ADS)

    Wilson, Thomas M.; Stewart, Carol; Sword-Daniels, Victoria; Leonard, Graham S.; Johnston, David M.; Cole, Jim W.; Wardman, Johnny; Wilson, Grant; Barnard, Scott T.

    2012-01-01

    Volcanic eruptions can produce a wide range of hazards. Although phenomena such as pyroclastic flows and surges, sector collapses, lahars and ballistic blocks are the most destructive and dangerous, volcanic ash is by far the most widely distributed eruption product. Although ash falls rarely endanger human life directly, threats to public health and disruption to critical infrastructure services, aviation and primary production can lead to significant societal impacts. Even relatively small eruptions can cause widespread disruption, damage and economic loss. Volcanic eruptions are, in general, infrequent and somewhat exotic occurrences, and consequently in many parts of the world, the management of critical infrastructure during volcanic crises can be improved with greater knowledge of the likely impacts. This article presents an overview of volcanic ash impacts on critical infrastructure, other than aviation and fuel supply, illustrated by findings from impact assessment reconnaissance trips carried out to a wide range of locations worldwide by our international research group and local collaborators. ‘Critical infrastructure’ includes those assets, frequently taken for granted, which are essential for the functioning of a society and economy. Electricity networks are very vulnerable to disruption from volcanic ash falls. This is particularly the case when fine ash is erupted because it has a greater tendency to adhere to line and substation insulators, where it can cause flashover (unintended electrical discharge) which can in turn cause widespread and disruptive outages. Weather conditions are a major determinant of flashover risk. Dry ash is not conductive, and heavy rain will wash ash from insulators, but light rain/mist will mobilise readily-soluble salts on the surface of the ash grains and lower the ash layer’s resistivity. Wet ash is also heavier than dry ash, increasing the risk of line breakage or tower/pole collapse. Particular issues for water

  13. Forecasting residential electricity demand in provincial China.

    PubMed

    Liao, Hua; Liu, Yanan; Gao, Yixuan; Hao, Yu; Ma, Xiao-Wei; Wang, Kan

    2017-03-01

    In China, more than 80% electricity comes from coal which dominates the CO2 emissions. Residential electricity demand forecasting plays a significant role in electricity infrastructure planning and energy policy designing, but it is challenging to make an accurate forecast for developing countries. This paper forecasts the provincial residential electricity consumption of China in the 13th Five-Year-Plan (2016-2020) period using panel data. To overcome the limitations of widely used predication models with unreliably prior knowledge on function forms, a robust piecewise linear model in reduced form is utilized to capture the non-deterministic relationship between income and residential electricity consumption. The forecast results suggest that the growth rates of developed provinces will slow down, while the less developed will be still in fast growing. The national residential electricity demand will increase at 6.6% annually during 2016-2020, and populous provinces such as Guangdong will be the main contributors to the increments.

  14. Constructing Ebola transmission chains from West Africa and estimating model parameters using internet sources.

    PubMed

    Pettey, W B P; Carter, M E; Toth, D J A; Samore, M H; Gundlapalli, A V

    2017-07-01

    During the recent Ebola crisis in West Africa, individual person-level details of disease onset, transmissions, and outcomes such as survival or death were reported in online news media. We set out to document disease transmission chains for Ebola, with the goal of generating a timely account that could be used for surveillance, mathematical modeling, and public health decision-making. By accessing public web pages only, such as locally produced newspapers and blogs, we created a transmission chain involving two Ebola clusters in West Africa that compared favorably with other published transmission chains, and derived parameters for a mathematical model of Ebola disease transmission that were not statistically different from those derived from published sources. We present a protocol for responsibly gleaning epidemiological facts, transmission model parameters, and useful details from affected communities using mostly indigenously produced sources. After comparing our transmission parameters to published parameters, we discuss additional benefits of our method, such as gaining practical information about the affected community, its infrastructure, politics, and culture. We also briefly compare our method to similar efforts that used mostly non-indigenous online sources to generate epidemiological information.

  15. Method and apparatus for executing a shift in a hybrid transmission

    DOEpatents

    Gupta, Pinaki; Kaminsky, Lawrence A; Demirovic, Besim

    2013-09-03

    A method for executing a transmission shift in a hybrid transmission including first and second electric machines includes executing a shift-through-neutral sequence from an initial transmission state to a target transmission state including executing an intermediate shift to neutral. Upon detecting a change in an output torque request while executing the shift-through-neutral sequence, possible recovery shift paths are identified. Available ones of the possible recovery shift paths are identified and a shift cost for each said available recovery shift path is evaluated. The available recovery shift path having a minimum shift cost is selected as a preferred recovery shift path and is executed to achieve a non-neutral transmission state.

  16. Making green infrastructure healthier infrastructure

    PubMed Central

    Lõhmus, Mare; Balbus, John

    2015-01-01

    Increasing urban green and blue structure is often pointed out to be critical for sustainable development and climate change adaptation, which has led to the rapid expansion of greening activities in cities throughout the world. This process is likely to have a direct impact on the citizens’ quality of life and public health. However, alongside numerous benefits, green and blue infrastructure also has the potential to create unexpected, undesirable, side-effects for health. This paper considers several potential harmful public health effects that might result from increased urban biodiversity, urban bodies of water, and urban tree cover projects. It does so with the intent of improving awareness and motivating preventive measures when designing and initiating such projects. Although biodiversity has been found to be associated with physiological benefits for humans in several studies, efforts to increase the biodiversity of urban environments may also promote the introduction and survival of vector or host organisms for infectious pathogens with resulting spread of a variety of diseases. In addition, more green connectivity in urban areas may potentiate the role of rats and ticks in the spread of infectious diseases. Bodies of water and wetlands play a crucial role in the urban climate adaptation and mitigation process. However, they also provide habitats for mosquitoes and toxic algal blooms. Finally, increasing urban green space may also adversely affect citizens allergic to pollen. Increased awareness of the potential hazards of urban green and blue infrastructure should not be a reason to stop or scale back projects. Instead, incorporating public health awareness and interventions into urban planning at the earliest stages can help insure that green and blue infrastructure achieves full potential for health promotion. PMID:26615823

  17. 77 FR 48499 - U.S. Multi-Sector Trade Mission to South India and Sri Lanka Chennai and Cochin, India and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-14

    ... losses in India's transmission and distribution sector exceed 30%, which ranks among the highest rates of... Sri Lanka boost their infrastructure and building requirements. Target subsectors holding high.... The availability of electricity, fresh water, long coastline, backwaters, good banking facilities...

  18. 75 FR 67989 - Agency Information Collection Activities: Office of Infrastructure Protection; Infrastructure...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-04

    ..., National Protection and Programs Directorate, Office of Infrastructure Protection (IP), will submit the... manner.'' DHS designated IP to lead these efforts. Given that the vast majority of the Nation's critical infrastructure and key resources in most sectors are privately owned or controlled, IP's success in achieving the...

  19. High Voltage Power Transmission for Wind Energy

    NASA Astrophysics Data System (ADS)

    Kim, Young il

    The high wind speeds and wide available area at sea have recently increased the interests on offshore wind farms in the U.S.A. As offshore wind farms become larger and are placed further from the shore, the power transmission to the onshore grid becomes a key feature. Power transmission of the offshore wind farm, in which good wind conditions and a larger installation area than an onshore site are available, requires the use of submarine cable systems. Therefore, an underground power cable system requires unique design and installation challenges not found in the overhead power cable environment. This paper presents analysis about the benefit and drawbacks of three different transmission solutions: HVAC, LCC/VSC HVDC in the grid connecting offshore wind farms and also analyzed the electrical characteristics of underground cables. In particular, loss of HV (High Voltage) subsea power of the transmission cables was evaluated by the Brakelmann's theory, taking into account the distributions of current and temperature.

  20. Green Infrastructure Modeling Toolkit

    EPA Pesticide Factsheets

    EPA's Green Infrastructure Modeling Toolkit is a toolkit of 5 EPA green infrastructure models and tools, along with communication materials, that can be used as a teaching tool and a quick reference resource when making GI implementation decisions.

  1. EXTRACTION OF FRACTURE-MECHANICS AND TRANSMISSION-ELECTRON-MICROSCOPY SAMPLES FROM TRITIUM-EXPOSED RESERVOIRS USING ELECTRIC-DISCHARGE MACHINING

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Morgan, M; Ken Imrich, K; Michael Tosten, M

    2006-08-31

    The Enhanced Surveillance Campaign is funding a program to investigate tritium aging effects on the structural properties of tritium reservoir steels. The program is designed to investigate how the structural properties of reservoir steels change during tritium service and to examine the role of microstructure and reservoir manufacturing on tritium compatibility. New surveillance tests are also being developed that can better gauge the long-term effects of tritium and its radioactive decay product, helium-3, on the properties of reservoir steels. In order to conduct these investigations, three types of samples are needed from returned reservoirs: tensile, fracture mechanics, and transmission-electron microscopymore » (TEM). An earlier report demonstrated how the electric-discharge machining (EDM) technique can be used for cutting tensile samples from serial sections of a 3T reservoir and how yield strength, ultimate strength and elongation could be measured from those samples. In this report, EDM was used successfully to section sub-sized fracture-mechanics samples from the inner and outer walls of a 3T reservoir and TEM samples from serial sections of a 1M reservoir. This report fulfills the requirements for the FY06 Level 3 milestone, TSR 15.1 ''Cut Fracture-Mechanics Samples from Tritium-Exposed Reservoir'' and TSR 15.2 ''Cut Transmission-electron-microscopy foils from Tritium-Exposed Reservoir'' for the Enhance Surveillance Campaign (ESC). This was in support of ESC L2-1870 Milestone-''Provide aging and lifetime assessments of selected components and materials for multiple enduring stockpile systems''.« less

  2. Electron transport in electrically biased inverse parabolic double-barrier structure

    NASA Astrophysics Data System (ADS)

    M, Bati; S, Sakiroglu; I, Sokmen

    2016-05-01

    A theoretical study of resonant tunneling is carried out for an inverse parabolic double-barrier structure subjected to an external electric field. Tunneling transmission coefficient and density of states are analyzed by using the non-equilibrium Green’s function approach based on the finite difference method. It is found that the resonant peak of the transmission coefficient, being unity for a symmetrical case, reduces under the applied electric field and depends strongly on the variation of the structure parameters.

  3. Critical Infrastructure Interdependencies Assessment

    DOE PAGES

    Petit, Frederic; Verner, Duane

    2016-11-01

    Throughout the world there is strong recognition that critical infrastructure security and resilience needs to be improved. In the United States, the National Infrastructure Protection Plan (NIPP) provides the strategic vision to guide the national effort to manage risk to the Nation’s critical infrastructure.”1 The achievement of this vision is challenged by the complexity of critical infrastructure systems and their inherent interdependencies. The update to the NIPP presents an opportunity to advance the nation’s efforts to further understand and analyze interdependencies. Such an important undertaking requires the involvement of public and private sector stakeholders and the reinforcement of existing partnershipsmore » and collaborations within the U.S. Department of Homeland Security (DHS) and other Federal agencies, including national laboratories; State, local, tribal, and territorial governments; and nongovernmental organizations.« less

  4. Analysis of surveying and legal problems in granting right-of-way and expropriation for the purpose of locating technical infrastructure

    NASA Astrophysics Data System (ADS)

    Trembecka, Anna

    2016-06-01

    A condition which determines the location of technical infrastructure is an entrepreneur holding the right to use the property for construction purposes. Currently, there are parallel separate legal forms allowing the use of a real property for the purpose of locating transmission lines, i.e. transmission easement (right-of-way) established under the civil law and expropriation by limiting the rights to a property under the administrative law. The aim of the study is to compare these forms conferring the right to use real properties and to analyze the related surveying and legal problems occurring in practice. The research thesis of the article is ascertainment that the current legal provisions for establishing legal titles to a property in order to locate transmission lines need to be amended. The conducted study regarded legal conditions, extent of expropriation and granting right-of-way in the city of Krakow, as well as the problems associated with the ambiguous wording of the legal regulations. Part of the research was devoted to the form of rights to land in order to carry out similar projects in some European countries (France, Czech Republic, Germany, Sweden). The justification for the analysis of these issues is dictated by the scale of practical use of the aforementioned forms of rights to land in order to locate technical infrastructure. Over the period of 2011-2014, 651 agreements were concluded on granting transmission right-of-way for 967 cadastral parcels owned by the city of Krakow, and 105 expropriation decisions were issued, limiting the use of real properties in Krakow.

  5. ACHP | Energy Development, Transmission, and Historic Preservation

    Science.gov Websites

    review process established in Section 106 of the National Historic Preservation Act (NHPA), when applied review process established in Section 106 of the NHPA. Federal agencies reviewing or approving these regarding Coordination in Federal Agency Review of Electric Transmission Facilities on Federal Land Gateway

  6. Protocol independent transmission method in software defined optical network

    NASA Astrophysics Data System (ADS)

    Liu, Yuze; Li, Hui; Hou, Yanfang; Qiu, Yajun; Ji, Yuefeng

    2016-10-01

    With the development of big data and cloud computing technology, the traditional software-defined network is facing new challenges (e.i., ubiquitous accessibility, higher bandwidth, more flexible management and greater security). Using a proprietary protocol or encoding format is a way to improve information security. However, the flow, which carried by proprietary protocol or code, cannot go through the traditional IP network. In addition, ultra- high-definition video transmission service once again become a hot spot. Traditionally, in the IP network, the Serial Digital Interface (SDI) signal must be compressed. This approach offers additional advantages but also bring some disadvantages such as signal degradation and high latency. To some extent, HD-SDI can also be regard as a proprietary protocol, which need transparent transmission such as optical channel. However, traditional optical networks cannot support flexible traffics . In response to aforementioned challenges for future network, one immediate solution would be to use NFV technology to abstract the network infrastructure and provide an all-optical switching topology graph for the SDN control plane. This paper proposes a new service-based software defined optical network architecture, including an infrastructure layer, a virtualization layer, a service abstract layer and an application layer. We then dwell on the corresponding service providing method in order to implement the protocol-independent transport. Finally, we experimentally evaluate that proposed service providing method can be applied to transmit the HD-SDI signal in the software-defined optical network.

  7. Improving our understanding of hydraulic-electrical relations: A case study of the surficial aquifer in Emirate Abu Dhabi

    USGS Publications Warehouse

    Ikard, Scott; Kress, Wade

    2016-01-01

    Transmissivity is a bulk hydraulic property that can be correlated with bulk electrical properties of an aquifer. In aquifers that are electrically-resistive relative to adjacent layers in a horizontally stratified sequence, transmissivity has been shown to correlate with bulk transverse resistance. Conversely, in aquifers that are electrically-conductive relative to adjacent layers, transmissivity has been shown to correlate with bulk longitudinal conductance. In both cases, previous investigations have relied on small datasets (on average less than eight observations) that have yielded coefficients of determination (R2) that are typically in the range of 0.6 to 0.7 to substantiate these relations. Compared to previous investigations, this paper explores hydraulic-electrical relations using a much larger dataset. Geophysical data collected from 26 boreholes in Emirate Abu Dhabi, United Arab Emirates, are used to correlate transmissivity modeled from neutron porosity logs to the bulk electrical properties of the surficial aquifer that are computed from deep-induction logs. Transmissivity is found to be highly correlated with longitudinal conductance. An R2 value of 0.853 is obtained when electrical effects caused by variations in pore-fluid salinity are taken into consideration.

  8. Green Infrastructure Fact Sheet

    EPA Science Inventory

    We briefly describe the environmental issues associated with stormwater runoff, describe the purpose of green infrastructure and key techniques used. We also highlight environmental and economic benefits of green infrastructure through text and tables, as well as provide US wate...

  9. Multi-Scale Infrastructure Assessment

    EPA Science Inventory

    The U.S. Environmental Protection Agency’s (EPA) multi-scale infrastructure assessment project supports both water resource adaptation to climate change and the rehabilitation of the nation’s aging water infrastructure by providing tools, scientific data and information to progra...

  10. Multiturn split-conductor transmission-line resonator

    NASA Astrophysics Data System (ADS)

    Haziza, Nathalie; Bittoun, Jacques; Kan, Siew

    1997-05-01

    A split-conductor parallel-plate transmission line resonator is a simple structure made from bending a strip of double-face copper-clad printed-circuit board into a loop with alternate electrical discontinuities (gaps) on opposite sides. Its natural resonant frequency (Fn) is determined by the transmission line characteristic impedance, the loop diameter or strip length, and the number (Ng) of gaps. It is easy to design high frequency resonators simply by increasing Ng. We propose here a single-gap multiturn resonator for low frequency operation as well as a simplified expression for the determination of Fn. A design procedure of this type of resonator is outlined and illustrative examples with parallel-plate as well as ordinary 50 Ω coaxial transmission lines are given. Also, for a given cable length, numerical calculation shows that the minimum resonator frequency can be attained with a form factor of the order of 2.

  11. Carbon emissions of infrastructure development.

    PubMed

    Müller, Daniel B; Liu, Gang; Løvik, Amund N; Modaresi, Roja; Pauliuk, Stefan; Steinhoff, Franciska S; Brattebø, Helge

    2013-10-15

    Identifying strategies for reconciling human development and climate change mitigation requires an adequate understanding of how infrastructures contribute to well-being and greenhouse gas emissions. While direct emissions from infrastructure use are well-known, information about indirect emissions from their construction is highly fragmented. Here, we estimated the carbon footprint of the existing global infrastructure stock in 2008, assuming current technologies, to be 122 (-20/+15) Gt CO2. The average per-capita carbon footprint of infrastructures in industrialized countries (53 (± 6) t CO2) was approximately 5 times larger that that of developing countries (10 (± 1) t CO2). A globalization of Western infrastructure stocks using current technologies would cause approximately 350 Gt CO2 from materials production, which corresponds to about 35-60% of the remaining carbon budget available until 2050 if the average temperature increase is to be limited to 2 °C, and could thus compromise the 2 °C target. A promising but poorly explored mitigation option is to build new settlements using less emissions-intensive materials, for example by urban design; however, this strategy is constrained by a lack of bottom-up data on material stocks in infrastructures. Infrastructure development must be considered in post-Kyoto climate change agreements if developing countries are to participate on a fair basis.

  12. Impacts of Extreme Space Weather Events on Power Grid Infrastructure: Physics-Based Modelling of Geomagnetically-Induced Currents (GICs) During Carrington-Class Geomagnetic Storms

    NASA Astrophysics Data System (ADS)

    Henderson, M. G.; Bent, R.; Chen, Y.; Delzanno, G. L.; Jeffery, C. A.; Jordanova, V. K.; Morley, S.; Rivera, M. K.; Toth, G.; Welling, D. T.; Woodroffe, J. R.; Engel, M.

    2017-12-01

    Large geomagnetic storms can have devastating effects on power grids. The largest geomagnetic storm ever recorded - called the Carrington Event - occurred in 1859 and produced Geomagnetically Induced Currents (GICs) strong enough to set fires in telegraph offices. It has been estimated that if such a storm occurred today, it would have devastating, long-lasting effects on the North American power transmission infrastructure. Acutely aware of this imminent threat, the North American Electric Reliability Corporation (NERC) was recently instructed to establish requirements for transmission system performance during geomagnetic disturbance (GMD) events and, although the benchmarks adopted were based on the best available data at the time, they suffer from a severely limited physical understanding of the behavior of GMDs and the resulting GICs for strong events. To rectify these deficiencies, we are developing a first-of-its-kind data-informed modelling capability that will provide transformational understanding of the underlying physical mechanisms responsible for the most harmful intense localized GMDs and their impacts on real power transmission networks. This work is being conducted in two separate modes of operation: (1) using historical, well-observed large storm intervals for which robust data-assimilation can be performed, and (2) extending the modelling into a predictive realm in order to assess impacts of poorly and/or never-before observed Carrington-class events. Results of this work are expected to include a potential replacement for the current NERC benchmarking methodology and the development of mitigation strategies in real power grid networks. We report on progress to date and show some preliminary results of modeling large (but not yet extreme) events.

  13. Potential barriers to electric vehicle commercialization : A. insurance B. vehicle recharging

    DOT National Transportation Integrated Search

    1981-03-01

    An assessment of the potential barriers to the commercialization of electric and hybrid vehicles due to insurance considerations and the absence of a range extension infrastructure was performed. Availability of operator and manufacturers liability i...

  14. How dangerous are mobile phones, transmission masts, and electricity pylons?

    PubMed

    Wood, A W

    2006-04-01

    Electrical power and mobile communications deliver enormous benefit to society, but there are concerns whether the electric and magnetic field (EMF) emissions associated with the delivery of this benefit are linked to cancer or other health hazards. This article reviews the strength of the available epidemiological and laboratory evidence and notes that this falls short of what is normally required to establish a causal link. However, because of scientific uncertainty a cautious approach is often advocated, but here, too, there may be a tendency to judge these risks more harshly than those in other areas with similar strength of evidence.

  15. 76 FR 24187 - Electricity Market Transparency Provisions of Section 220 of the Federal Power Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-29

    ... section 1281 of the Energy Policy Act of 2005 (EPAct 2005), to facilitate price transparency in markets... availability and prices of wholesale electric energy and transmission service to the Commission, State... 220 to ``facilitate price transparency in the markets for the sale and transmission of electric energy...

  16. Developing an infrastructure index : phase I.

    DOT National Transportation Integrated Search

    2010-04-01

    Over the past decade the American Society of Civil Engineers has used the Infrastructure Report : Card to raise awareness of infrastructure issues. Aging and deteriorating infrastructure has : recently been highlighted in the popular media. However, ...

  17. CALS Infrastructure Analysis. Draft. Volume 21

    DOT National Transportation Integrated Search

    1990-03-01

    This executive overview to the DoD CALS Infrastructure Analysis Report summarizes the Components' current effort to modernize the DoD technical data infrastructure. This infrastructure includes all existing and planned capabilities to acquire, manage...

  18. The Influence of Dams on Malaria Transmission in Sub-Saharan Africa.

    PubMed

    Kibret, Solomon; Wilson, G Glenn; Ryder, Darren; Tekie, Habte; Petros, Beyene

    2017-06-01

    The construction of dams in sub-Saharan Africa is pivotal for food security and alleviating poverty in the region. However, the unintended adverse public health implications of extending the spatial distribution of water infrastructure are poorly documented and may minimize the intended benefits of securing water supplies. This paper reviews existing studies on the influence of dams on the spatial distribution of malaria parasites and vectors in sub-Saharan Africa. Common themes emerging from the literature were that dams intensified malaria transmission in semi-arid and highland areas with unstable malaria transmission but had little or no impact in areas with perennial transmission. Differences in the impacts of dams resulted from the types and characteristics of malaria vectors and their breeding habitats in different settings of sub-Saharan Africa. A higher abundance of a less anthropophilic Anopheles arabiensis than a highly efficient vector A. gambiae explains why dams did not increase malaria in stable areas. In unstable areas where transmission is limited by availability of water bodies for vector breeding, dams generally increase malaria by providing breeding habitats for prominent malaria vector species. Integrated vector control measures that include reservoir management, coupled with conventional malaria control strategies, could optimize a reduction of the risk of malaria transmission around dams in the region.

  19. Cloud Infrastructure & Applications - CloudIA

    NASA Astrophysics Data System (ADS)

    Sulistio, Anthony; Reich, Christoph; Doelitzscher, Frank

    The idea behind Cloud Computing is to deliver Infrastructure-as-a-Services and Software-as-a-Service over the Internet on an easy pay-per-use business model. To harness the potentials of Cloud Computing for e-Learning and research purposes, and to small- and medium-sized enterprises, the Hochschule Furtwangen University establishes a new project, called Cloud Infrastructure & Applications (CloudIA). The CloudIA project is a market-oriented cloud infrastructure that leverages different virtualization technologies, by supporting Service-Level Agreements for various service offerings. This paper describes the CloudIA project in details and mentions our early experiences in building a private cloud using an existing infrastructure.

  20. 75 FR 6180 - Mission Statement; Secretarial China Clean Energy Business Development Mission; May 16-21, 2010

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-08

    ... addition, Hong Kong has an efficient, transparent legal system based on common law principles that offer... 2020. The current grid infrastructure system is unable to support greater electricity movement from... sector, including traditional transmission/distribution systems and smart grid technologies, offers huge...