Science.gov

Sample records for energy commission desenvolvimento

  1. A History of the Atomic Energy Commission

    DOE R&D Accomplishments Database

    Buck, Alice L.

    1983-07-01

    This pamphlet traces the history of the US Atomic Energy Commission's twenty-eight year stewardship of the Nation's nuclear energy program, from the signing of the Atomic Energy Act on August 1, 1946 to the signing of the Energy Reorganization Act on October 11, 1974. The Commission's early concentration on the military atom produced sophisticated nuclear weapons for the Nation's defense and made possible the creation of a fleet of nuclear submarines and surface ships. Extensive research in the nuclear sciences resulted in the widespread application of nuclear technology for scientific, medical and industrial purposes, while the passage of the Atomic Energy Act of 1954 made possible the development of a nuclear industry, and enabled the United States to share the new technology with other nations.

  2. Curriculum for Commissioning Energy Efficient Buildings

    SciTech Connect

    Webster, Lia

    2012-09-30

    In July 2010, the U.S. Department of Energy (DOE) awarded funding to PECI to develop training curriculum in commercial energy auditing and building commissioning. This program was created in response to the high demand for auditing and commissioning services in the U.S. commercial buildings market and to bridge gaps and barriers in existing training programs. Obstacles addressed included: lack of focus on entry level candidates; prohibitive cost and time required for training; lack of hands-on training; trainings that focus on certifications & process overviews; and lack of comprehensive training. PECI organized several other industry players to create a co-funded project sponsored by DOE, PECI, New York State Energy and Research Development Authority (NYSERDA), California Energy Commission (CEC), Northwest Energy Efficiency Alliance (NEEA) and California Commissioning Collaborative (CCC). After awarded, PECI teamed with another DOE awardee, New Jersey Institute of Technology (NJIT), to work collaboratively to create one comprehensive program featuring two training tracks. NJIT’s Center for Building Knowledge is a research and training institute affiliated with the College of Architecture and Design, and provided e-learning and video enhancements. This project designed and developed two training programs with a comprehensive, energy-focused curriculum to prepare new entrants to become energy auditors or commissioning authorities (CxAs). The following are the key elements of the developed trainings, which is depicted graphically in Figure 1: • Online classes are self-paced, and can be completed anywhere, any time • Commissioning Authority track includes 3 online modules made up of 24 courses delivered in 104 individual lessons, followed by a 40 hour hands-on lab. Total time required is between 75 and 100 hours, depending on the pace of the independent learner. • Energy Auditor track includes 3 online modules made up of 18 courses delivered in 72 individual

  3. Federal Energy Regulatory Commission fiscal year 1997 annual financial statements

    SciTech Connect

    1998-02-24

    This report presents the results of the independent certified public accountants` audit of the Federal Energy Regulatory commission`s statements of financial position, and the related statements of operations and changes in net position. The auditors` work was conducted in accordance with generally accepted government auditing standards. An independent public accounting firm conducted the audit. The auditors` reports on the Commission`s internal control structure and compliance with laws and regulations disclosed no reportable conditions or instances of noncompliance.

  4. Instrumented home energy rating and commissioning

    SciTech Connect

    Wray, Craig P.; Walker, Iain S.; Sherman, Max H.

    2003-05-01

    Currently, houses do not perform optimally or even as many codes and forecasts predict, largely because they are field assembled and there is no consistent process to identify deficiencies or to correct them. Solving this problem requires field performance evaluations using appropriate and agreed upon procedures in the form of a new process called residential commissioning. The purpose of this project is to develop and document these procedures and to demonstrate the value that applying them could provide in both new and existing California houses. This project has four specific objectives: to develop metrics and diagnostics for assessing house performance, to provide information on the potential benefits of commissioning using a whole-house approach, to develop programmatic guidelines for commissioning, and to conduct outreach efforts to transfer project results to industry stakeholders. The primary outcomes from this project are the development of residential commissioning guidelines and the analytical confirmation that there are significant potential benefits associated with commissioning California houses, particularly existing ones. In addition, we have made substantial advances in understanding the accuracy and usability of diagnostics for commissioning houses. In some cases, we have been able to work with equipment manufacturers to improve these aspects of their diagnostic tools. These outcomes provide a solid foundation on which to build a residential commissioning program in California. We expect that a concerted effort will be necessary to integrate such a program with existing building industry efforts and to demonstrate its use in the field.

  5. Commissioning: A Highly Cost-Effective Building Energy Management Strategy

    SciTech Connect

    Mills, Evan

    2011-01-06

    Quality assurance and optimization are essential elements of any serious technological endeavor, including efforts to improve energy efficiency. Commissioning is an important tool in this respect. The aim of commissioning new buildings is to ensure that they deliver-if not exceed-the performance and energy savings promised by their design. When applied to existing buildings, one-time or repeated commissioning (often called retrocommissioning) identifies the almost inevitable drift in energy performance and puts the building back on course, often surpassing the original design intent. In both contexts, commissioning is a systematic, forensic approach to improving performance, rather than a discrete technology.

  6. Audit of the Federal Energy Regulatory Commission leased warehouse space

    SciTech Connect

    1996-05-24

    The Federal Energy Regulatory Commission (Commission) stores furniture, automated data processing equipment, and office supplies in a warehouse located in Landover, Maryland. The annual operating cost for this space (25,830 square feet) approximates $455,000-$245,000 in lease costs and $210,000 for contractor personnel. The purpose of the audit was to assess the effectiveness of the Commission`s use of warehouse space. The specific audit objective was to determine whether the Commission was minimizing the need for warehouse space for the storage of office supplies, furniture, and equipment. Federal Property Management Regulations and prudent business practices require Government agencies to minimize their need for space. More space was being leased than needed because Commission officials understood that they were obligated by terms of the lease to -pay for the space until March 31, 2002. We found, however, that there was a misunderstanding by officials, and that the Commission could at any time relinquish warehouse space by giving 120 days notice. Because of this misunderstanding and the recent relocation of the Commission to a newly furnished facility, about 16,000 square feet of warehouse space was being used to store furniture and equipment that was no longer needed by the Commission. An additional 6,000 square feet of space was used to store office supplies instead of using a more frequent ordering program that would reduce space requirements.

  7. 77 FR 16828 - Constellation Energy Commodities Group, Inc.; Notice of Designation of Certain Commission...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-22

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Constellation Energy Commodities Group, Inc.; Notice of Designation of Certain Commission Personnel as Non-Decisional Commission staff members Sandra Waldstein and...

  8. 76 FR 62055 - Mississippi Delta Energy Agency, Clarksdale Public Utilities Commission, Public Service...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-06

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Mississippi Delta Energy Agency, Clarksdale Public Utilities Commission... Practice and Procedures, and the applicable Tariff on file with the Commission, Mississippi Delta...

  9. Combined Film Catalog, 1972, United States Atomic Energy Commission.

    ERIC Educational Resources Information Center

    Atomic Energy Commission, Washington, DC.

    A comprehensive listing of all current United States Atomic Energy Commission (USAEC) films, this catalog describes 232 films in two major film collections. Part One: Education-Information contains 17 subject categories and two series and describes 134 films with indicated understanding levels on each film for use by schools. The categories…

  10. Division D Commission 44: Space and High-Energy Astrophysics

    NASA Astrophysics Data System (ADS)

    Jones, Christine; Brosch, Noah; Hasinger, Günther; Baring, Matthew G.; Barstow, Martin Adrian; Braga, Joao; Churazov, Evgenij M.; Eilik, Jean; Kunieda, Hideyo; Murthy, Jayant; Pagano, Isabella; Quintana, Hernan; Salvati, Marco; Singh, Kulinder Pal; Worrall, Diana Mary

    2016-04-01

    Division XI, the predecessor to Division D until 2012, was formed in 1994 at the IAU General Assembly in The Hague by merging Commission 44 Astronomy from Space and Commission 48 High Energy Astrophysics. Historically, space astrophysics started with the high energy wavelengths (far UV, X-ray, and gamma-ray astronomy) which are only accessible from space. However, in modern astronomy, to study high energy astrophysical processes, almost all wavelengths are used (including gamma-ray, X-ray, UV, optical, infrared, submillimeter and radio). In addition other ground-based facilities, including gravitational wave antennas, neutrino detectors and high-energy cosmic ray arrays are joining in this era of multi-messenger astrophysics, as well as space missions with the primary goals to discover and study exoplanets, are under the umbrella of Division XI.

  11. Navajo-Hopi Land Commission Renewable Energy Development Project (NREP)

    SciTech Connect

    Thomas Benally, Deputy Director,

    2012-05-15

    The Navajo Hopi Land Commission Office (NHLCO), a Navajo Nation executive branch agency has conducted activities to determine capacity-building, institution-building, outreach and management activities to initiate the development of large-scale renewable energy - 100 megawatt (MW) or larger - generating projects on land in Northwestern New Mexico in the first year of a multi-year program. The Navajo Hopi Land Commission Renewable Energy Development Project (NREP) is a one year program that will develop and market a strategic business plan; form multi-agency and public-private project partnerships; compile site-specific solar, wind and infrastructure data; and develop and use project communication and marketing tools to support outreach efforts targeting the public, vendors, investors and government audiences.

  12. Impacts of Modeled Recommendations of the National Commission on Energy Policy

    EIA Publications

    2005-01-01

    This report provides the Energy Information Administration's analysis of those National Commission on Energy Policy (NCEP) energy policy recommendations that could be simulated using the National Energy Modeling System (NEMS).

  13. Report to the Legislature on the California Energy Commission's Geothermal Development Grant Program for Local Governments

    SciTech Connect

    Not Available

    1983-04-01

    This report documents the California Energy Commission's administration of its Geothermal Development Grant Program for Local Governments. The Energy Commission established this program as a result of the passage of Assembly Bill 1905 (Bosco) in 1980. This legislation established the mechanism to distribute the state's share of revenues received from the leasing of federal mineral reserves for geothermal development. The federal government deposits these revenues in the Geothermal Resources Development Account (GRDA) created by AB 1905. The state allocates funds from the GRDA to the California Parklands and Renewable Resources Investment Fund, the counties of origin where the federal leases are located, and the Energy Commission. The legislation further directs the Energy Commission to disburse its share as grants to local governments to assist with the planning and development of geothermal resources. Activities which are eligible for funding under the Energy Commission's grant program include resource development projects, planning and feasibility studies, and activities to mitigate the impacts of existing geothermal development.

  14. 10 CFR 1040.124 - Responsibility of the Federal Energy Regulatory Commission.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... be placed in title 18 CFR. Judicial Review ... 10 Energy 4 2011-01-01 2011-01-01 false Responsibility of the Federal Energy Regulatory Commission. 1040.124 Section 1040.124 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NONDISCRIMINATION...

  15. 10 CFR 1040.124 - Responsibility of the Federal Energy Regulatory Commission.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... be placed in title 18 CFR. Judicial Review ... 10 Energy 4 2013-01-01 2013-01-01 false Responsibility of the Federal Energy Regulatory Commission. 1040.124 Section 1040.124 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NONDISCRIMINATION...

  16. 10 CFR 1040.124 - Responsibility of the Federal Energy Regulatory Commission.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... be placed in title 18 CFR. Judicial Review ... 10 Energy 4 2010-01-01 2010-01-01 false Responsibility of the Federal Energy Regulatory Commission. 1040.124 Section 1040.124 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NONDISCRIMINATION...

  17. 10 CFR 1040.124 - Responsibility of the Federal Energy Regulatory Commission.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... be placed in title 18 CFR. Judicial Review ... 10 Energy 4 2014-01-01 2014-01-01 false Responsibility of the Federal Energy Regulatory Commission. 1040.124 Section 1040.124 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NONDISCRIMINATION...

  18. 12. Architectural Floor Plans, 233S, U.S. Atomic Energy Commission, Hanford ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. Architectural Floor Plans, 233-S, U.S. Atomic Energy Commission, Hanford Atomic Products Operations, General Electric Company, Dwg. H-2-30464, 1956. - Reduction-Oxidation Complex, Plutonium Concentration Facility, 200 West Area, Richland, Benton County, WA

  19. 11. Architectural ELevations & Sections, 233S, U.S. Atomic Energy Commission, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. Architectural ELevations & Sections, 233-S, U.S. Atomic Energy Commission, Hanford Atomic Products Operations, General Electric Company, Dwg. No. H-2-30465, 1956. - Reduction-Oxidation Complex, Plutonium Concentration Facility, 200 West Area, Richland, Benton County, WA

  20. 13. Elevations, 233S, U.S. Atomic Energy Commission, Hanford Works, General ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. Elevations, 233-S, U.S. Atomic Energy Commission, Hanford Works, General Electric Company, Dwg. No. H-2-7203, 1956. - Reduction-Oxidation Complex, Plutonium Concentration Facility, 200 West Area, Richland, Benton County, WA

  1. 11. Building Layout, 185189 D, U.S. Atomic Energy Commission, Richland ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. Building Layout, 185-189 D, U.S. Atomic Energy Commission, Richland Operations Office, Dwg. No. H-1-14844, 1957. - D-Reactor Complex, Deaeration Plant-Refrigeration Buildings, Area 100-D, Richland, Benton County, WA

  2. 12. General Arrangement Plan, Building 189D, U.S. Atomic Energy Commission, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. General Arrangement Plan, Building 189-D, U.S. Atomic Energy Commission, General Electric Company, Dwg. No. H-1-11068, 1958. - D-Reactor Complex, Deaeration Plant-Refrigeration Buildings, Area 100-D, Richland, Benton County, WA

  3. 77 FR 56199 - Deutsche Bank Energy Trading LLC; Notice of Designation of Commission Staff as Non-Decisional

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-12

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Deutsche Bank Energy Trading LLC; Notice of Designation of Commission Staff as Non-Decisional With respect to an order issued by the Commission on September 5, 2012 in the above-captioned docket, with the...

  4. European Union energy policy integration: A case of European Commission policy entrepreneurship and increasing supranationalism

    PubMed Central

    Maltby, Tomas

    2013-01-01

    Focusing on gas, this article explores the role of the European Commission in the process of European Union energy security policy development, and the extent to which the policy area is becoming increasingly supranational. Situating the article within the literature on agenda-setting and framing, it is argued that a policy window was opened as a result of: enlargement to include more energy import dependent states, a trend of increasing energy imports and prices, and gas supply disruptions. From the mid-2000s, the Commission contributed to a shift in political norms, successfully framing import dependency as a problem requiring an EU-level solution, based on the institution’s pre-existing preferences for a diversified energy supply and internal energy market. Whilst Member States retain significant sovereignty, the Commission has achieved since 2006 creeping competencies in the internal, and to a lesser extent external, dimensions of EU energy policy. PMID:24926115

  5. European Union energy policy integration: A case of European Commission policy entrepreneurship and increasing supranationalism.

    PubMed

    Maltby, Tomas

    2013-04-01

    Focusing on gas, this article explores the role of the European Commission in the process of European Union energy security policy development, and the extent to which the policy area is becoming increasingly supranational. Situating the article within the literature on agenda-setting and framing, it is argued that a policy window was opened as a result of: enlargement to include more energy import dependent states, a trend of increasing energy imports and prices, and gas supply disruptions. From the mid-2000s, the Commission contributed to a shift in political norms, successfully framing import dependency as a problem requiring an EU-level solution, based on the institution's pre-existing preferences for a diversified energy supply and internal energy market. Whilst Member States retain significant sovereignty, the Commission has achieved since 2006 creeping competencies in the internal, and to a lesser extent external, dimensions of EU energy policy. PMID:24926115

  6. Commissioning of energy-efficiency measures: Costs and benefits for 16 buildings

    SciTech Connect

    Piette, M.A.; Nordman, B.; Greenberg, S.

    1995-04-01

    Building systems and energy-efficiency measures (EEMs) often don`t perform as well in practice as expected at the design stage. This fact has become clear to many organizations concerned with ensuring building performance. What to do about these problems is less clear. Several electric utilities around the U.S. have begun to take action to address the start-up, control, and operational problems that are found in nearly every building. One of the most beneficial periods to intervene in the building life cycle is during the start-up phase of a now building. Building commissioning during start up is such an intervention. Commissioning can be defined as: a set of procedures, responsibilities, and methods to advance a system from static installation to full working order in accordance with design intent. In broad terms, commissioning can extend from design reviews through operations and maintenance planning and training. With such a broad scope aimed at the entire building life cycle, commissioning is often likened to {open_quotes}Total Quality Management{close_quotes} Yet the heart of commissioning are the procedures developed and executed to ensure that all building systems function as intended. The incorporation of energy-efficiency criteria into building commissioning is a new development.

  7. Commission rules on aquaculture greenhouse cases defining useful thermal energy output

    SciTech Connect

    Not Available

    1984-08-01

    Recent Federal Energy Regulatory Commission (FERC) ruling qualified an aquaculture pond and a greenhouse project as topping cycle cogenerators that meet thermal energy output requirements. Case QF84-169 involves the use of heat from internal combustion engine exhaust to heat aquaculture ponds, and Case QF83-175 uses the heat from an internal combustion engine to heat greenhouses. Commission rejection of earlier proposals indicates a willingness to review cases on an individual bases. Future applicants will do well to see that their proposals meet established requirements for qualifying cogenerators. The author outlines arguments that prevailed in the rejected cases.

  8. Interim Report of the Commission to Review the Effectiveness of the National Energy Laboratories

    SciTech Connect

    Cohon, Jared L.; Glauthier, T. J.; Augustine, Norman R.; Austin, Wanda M.; Elachi, Charles; Fleury, Paul A.; Hockfield, Susan J.; Meserve, Richard A.; Murray, Cherry A.

    2015-02-27

    The Commission to Review the Effectiveness of the National Energy Laboratories was charged by Congress in January 2014 to evaluate the mission, capabilities, size, performance, governance, and agency oversight of the 17 Department of Energy (DOE) laboratories. Given the incredibly broad scope and aggressive timeline (the original deadline was February 2015), the Secretary of Energy and Congress agreed to split the task into two phases. This interim report contains the preliminary observations and recommendations gleaned from Phase 1 of the study, which consisted of a literature review; visits to five of the National Laboratories; semi-structured interviews with staff from across the National Laboratories, DOE, other Federal agencies, companies, other non-governmental organizations, and additional interested parties; and presentations at monthly public Commission meetings. The Commission notes that the purpose of the National Laboratories is to provide critical capabilities and facilities in service of DOE’s mission and the needs of the broader national and international science and technology (S&T) community, including other Federal agencies, academia, and private industry. The National Laboratories are successfully fulfilling that mission today. While the Commission believes significant improvements can be made to many aspects of DOE management and governance of the laboratories, those issues do not detract from the National Laboratories’ remarkable contributions to the American public. In Phase 2 the Commission will focus on ways to make the process of carrying out their missions more efficient and effective.

  9. Geothermal research and development program of the US Atomic Energy Commission

    NASA Technical Reports Server (NTRS)

    Werner, L. B.

    1974-01-01

    Within the overall federal geothermal program, the Atomic Energy Commission has chosen to concentrate on development of resource utilization and advanced research and technology as the areas most suitable to the expertise of its staff and that of the National Laboratories. The Commission's work in geothermal energy is coordinated with that of other agencies by the National Science Foundation, which has been assigned lead agency by the Office of Management and Budget. The objective of the Commission's program, consistent with the goals of the total federal program is to facilitate, through technological advancement and pilot plant operations, achievement of substantial commercial production of electrical power and utilization of geothermal heat by the year 1985. This will hopefully be accomplished by providing, in conjunction with industry, credible information on the economic operation and technological reliability of geothermal power and use of geothermal heat.

  10. Journal of Glenn T. Seaborg, Chairman of the US Atomic Energy Commission, 1961--1971

    SciTech Connect

    Seaborg, G.T.

    1989-01-01

    In include a historical summary of the major accomplishments of the Atomic Energy Commission during the period of my chairmanship. This is done in a topical manner, i.e., by describing in summary form the accomplishments in each of a selected number of subject areas over the ten-year period. This is Volume 18 which covers January thru April 1969.

  11. Journal of Glenn T. Seaborg, Chairman of the US Atomic Energy Commission, 1961--1971

    SciTech Connect

    Seaborg, G.T.

    1989-01-01

    I include a historical summary of the major accomplishments of the Atomic Energy Commission during the period of my chairmanship. This is done in a topical manner, i.e., by describing in summary form the accomplishments in each of a selected number of subject areas over the ten-year period. This is Volume 12 which covers January thru June 1966.

  12. Journal of Glenn T. Seaborg, Chairman of the US Atomic Energy Commission, 1961--1971

    SciTech Connect

    Seaborg, G.T.

    1989-01-01

    I include a historical summary of the major accomplishments of the Atomic Energy commission during the period of my chairmanship. This is done in a topical manner, i.e., by describing in summary form the accomplishments in each of a selected number of subject areas over the ten-year period. This is Volume 24 which covers January thru April 1971.

  13. Journal of Glenn T. Seaborg, Chairman of the US Atomic Energy Commission, 1961--1971

    SciTech Connect

    Seaborg, G.T.

    1989-01-01

    I include a historical summary of the major accomplishments of the Atomic Energy Commission during the period of my chairmanship. This is done in a topical manner, i.e., by describing in summary form the accomplishments in each of a selected number of subject areas over the ten-year period. This is Volume 25 which covers May thru November 1971.

  14. Journal of Glenn T. Seaborg, Chairman of the US Atomic Energy Commission, 1961--1971

    SciTech Connect

    Seaborg, G.T.

    1989-01-01

    I include a historical summary of the major accomplishments of the Atomic Energy Commission during the period of my chairmanship. This is done in a topical manner, i.e., by describing in summary form the accomplishments in each of a selected number of subject areas over the ten-year period. This is Volume 11 which covers July thru December 1965.

  15. Journal of Glenn T. Seaborg, Chairman of the US Atomic Energy Commission, 1961--1971

    SciTech Connect

    Seaborg, G.T.

    1989-01-01

    I include a historical summary of the major accomplishments of the Atomic Energy Commission during the period of my chairmanship. This is done in a topical manner, i.e., by describing in summary form the accomplishments in each of a selected number of subject areas over the ten-year period. This is Volume 23 which covers September thru December 1970.

  16. Journal of Glenn T. Seaborg, Chairman of the US Atomic Energy Commission, 1961--1971

    SciTech Connect

    Seaborg, G.T.

    1989-01-01

    I include a historical summary of the major accomplishments of the Atomic Energy Commission during the period of my chairmanship. This is done in a topical manner, i.e., by describing in summary form the accomplishments in each of a selected number of subject areas over the ten-year period. This is Volume 17 which covers July 1968 thru January 1969.

  17. Journal of Glenn T. Seaborg, Chairman of the US Atomic Energy Commission, 1961--1971

    SciTech Connect

    Seaborg, G.T.

    1989-01-01

    I include a historical summary of the major accomplishments of the Atomic Energy Commission during the period of my chairmanship. This is done in a topical manner, i.e., by describing in summary form the accomplishments in each of selected number of subject areas over the ten-year period. This is Volume 7 which covers November 1963 thru February 1964.

  18. Journal of Glenn T. Seaborg, Chairman of the US Atomic Energy Commission, 1961--1971

    SciTech Connect

    Seaborg, G.T.

    1989-01-01

    I include a historical summary of the major accomplishments of the Atomic Energy Commission during the period of my chairmanship. This is done in a topical manner, i.e., by describing in summary form the accomplishments in each of a selected number of subject areas over the ten-year period. This is Volume 6 which covers July--November 1963.

  19. Journal of Glenn T. Seaborg, Chairman of the US Atomic Energy Commission, 1961--1971

    SciTech Connect

    Seaborg, G.T.

    1989-01-01

    I include a historical summary of the major accomplishments of the Atomic Energy Commission during the period of my chairmanship. This is done in a topical manner, i.e., by describing in summary form the accomplishments in each of a selected number of subject areas over the ten-year period. This is Volume 10 which covers January thru June 1965.

  20. Journal of Glenn T. Seaborg, Chairman of the US Atomic Energy Commission, 1961--1971

    SciTech Connect

    Seaborg, G.T.

    1989-01-01

    I include an historical summary of the major accomplishments of the Atomic Energy Commission during the period of my chairmanship. This is done in a topical manner, i.e., by describing in summary form the accomplishments in each of a selected number of subject areas over the ten-year period. This is Vol. 3 which covers the first 6 months of 1962.

  1. Journal of Glenn T. Seaborg, Chairman of the US Atomic Energy Commission, 1961--1971

    SciTech Connect

    Seaborg, G.T.

    1989-01-01

    I include a historical summary of the major accomplishments of the Atomic Energy Commission during the period of my chairmanship. This is done in a topical manner, i.e., by describing in summary form the accomplishments in each of a selected number of subject areas over the ten-year period. This is Volume 8 which covers March thru June 1964.

  2. Journal of Glenn T. Seaborg, Chairman of the US Atomic Energy Commission, 1961--1971

    SciTech Connect

    Seaborg, G.T.

    1989-01-01

    I include a historical summary of the major accomplishments of the Atomic Energy Commission during the period of my chairmanship. This is done in a topical manner, i.e., by describing in summary form the accomplishments in each of a selected number of subject areas over the ten-year period. This is Volume 4 which covers July 1962 thru December 1962.

  3. Journal of Glenn T. Seaborg, Chairman of the US Atomic Energy Commission, 1961--1971

    SciTech Connect

    Seaborg, G.T.

    1989-01-01

    I include a historical summary of the major accomplishments of the Atomic Energy Commission during the period of my chairmanship. This is done in a topical manner, i.e., by describing in summary form the accomplishments in each of a selected number of subject areas over the ten-year period. This is Volume 14 which covers January thru June 1967.

  4. Journal of Glenn T. Seaborg, Chairman of the US Atomic Energy Commission, 1961--1971

    SciTech Connect

    Seaborg, G.T.

    1989-01-01

    I include a historical summary of the major accomplishments of the Atomic Energy Commission during the period of my chairmanship. This is done in a topical manner, i.e., by describing in summary form the accomplishments in each of a selected number of subject areas over the ten-year period. This is Volume 21 which covers January thru April 1970.

  5. Journal of Glenn T. Seaborg, Chairman of the US Atomic Energy Commission, 1961--1971

    SciTech Connect

    Seaborg, G.T.

    1989-01-01

    I include a historical summary of the major accomplishments of the Atomic Energy Commission during the period of my chairmanship. This is done in a topical manner, i.e., by describing in summary form the accomplishments in each of a selected number of subject areas over the ten-year period. This is Volume 22 which covers May thru August 1970.

  6. Journal of Glenn T. Seaborg, Chairman of the US Atomic Energy Commission, 1961--1971

    SciTech Connect

    Seaborg, G.T.

    1989-01-01

    I include a historical summary of the major accomplishments of the Atomic Energy Commission during the period of my chairmanship. This is done in a topical manner, i.e., by describing in summary form the accomplishments in each of a selected number of subject areas over the ten-year period. This is Volume 15 which covers July thru December 1967.

  7. Journal of Glenn T. Seaborg, Chairman of the US Atomic Energy Commission, 1961--1971

    SciTech Connect

    Seaborg, G.T.

    1989-01-01

    I include an historical summary of the major accomplishments of the Atomic Energy Commission during the period of my chairmanship. This is done in a topical manner, i.e., by describing in summary form the accomplishments in each of a selected number of subjects areas over the ten-year period. This is Volume 5 which covers the first 6 months of 1965.

  8. Journal of Glenn T. Seaborg, Chairman of the US Atomic Energy Commission, 1961--1971

    SciTech Connect

    Seaborg, G.T.

    1989-01-01

    I include a historical summary of the major accomplishments of the Atomic Energy Commission during the period of my chairmanship. This is done in a topical manner, i.e., by describing in summary form the accomplishments in each of selected number of subject areas over the ten-year period. This is Volume 13 which covers July thru December 1966.

  9. Journal of Glenn T. Seaborg, Chairman of the US Atomic Energy Commission, 1961--1971

    SciTech Connect

    Seaborg, G.T.

    1989-01-01

    I include a historical summary of the major accomplishments of the Atomic Energy Commission during the period of my chairmanship. This is done in a topical manner, i.e., by describing in summary form the accomplishments in each of a selected number of subject areas over the ten-year period. This is Volume 20 which covers September thru December 1969.

  10. Journal of Glenn T. Seaborg, Chairman of the US Atomic Energy Commission, 1961--1971

    SciTech Connect

    Seaborg, G.T.

    1989-01-01

    I include a historical summary of the major accomplishments of the Atomic Energy Commission during the period of my chairmanship. This is done in a topical manner, i.e., by describing in summary form the accomplishments in each of a selected number of subject areas over the ten-year period. This is Volume 16 which covers January thru June 1968.

  11. Journal of Glenn T. Seaborg, Chairman of the US Atomic Energy Commission, 1961--1971

    SciTech Connect

    Seaborg, G.T.

    1989-01-01

    I include a historical summary of the major accomplishments of the Atomic Energy Commission during the period of my chairmanship. This is done in a topical manner, i.e., by describing in summary form the accomplishments in each of a selected number of subject areas over the ten-year period. This is Volume 9 which covers July thru December 1964.

  12. Journal of Glenn T. Seaborg, Chairman of the US Atomic Energy Commission, 1961--1971

    SciTech Connect

    Seaborg, G.T.

    1989-01-01

    I include a historical summary of the major accomplishments of the Atomic Energy Commission during the period of my chairmanship. This is done in a topical manner, i.e., by describing in summary form the accomplishments in each of a selected number of subject areas over the ten-year period. This is Volume 19 which covers May thru August 1969.

  13. Building Commissioning: A Golden Opportunity for Reducing Energy Costs and Greenhouse-gas Emissions

    SciTech Connect

    Mills, Evan

    2009-07-16

    The aim of commissioning new buildings is to ensure that they deliver, if not exceed, the performance and energy savings promised by their design. When applied to existing buildings, commissioning identifies the almost inevitable 'drift' from where things should be and puts the building back on course. In both contexts, commissioning is a systematic, forensic approach to quality assurance, rather than a technology per se. Although commissioning has earned increased recognition in recent years - even a toehold in Wikipedia - it remains an enigmatic practice whose visibility severely lags its potential. Over the past decade, Lawrence Berkeley National Laboratory has built the world's largest compilation and meta-analysis of commissioning experience in commercial buildings. Since our last report (Mills et al. 2004) the database has grown from 224 to 643 buildings (all located in the United States, and spanning 26 states), from 30 to 100 million square feet of floorspace, and from $17 million to $43 million in commissioning expenditures. The recorded cases of new-construction commissioning took place in buildings representing $2.2 billion in total construction costs (up from 1.5 billion). The work of many more commissioning providers (18 versus 37) is represented in this study, as is more evidence of energy and peak-power savings as well as cost-effectiveness. We now translate these impacts into avoided greenhouse gases and provide new indicators of cost-effectiveness. We also draw attention to the specific challenges and opportunities for high-tech facilities such as labs, cleanrooms, data centers, and healthcare facilities. The results are compelling. We developed an array of benchmarks for characterizing project performance and cost-effectiveness. The median normalized cost to deliver commissioning was $0.30/ft2 for existing buildings and $1.16/ft2 for new construction (or 0.4% of the overall construction cost). The commissioning projects for which data are

  14. Status and Early Commissioning Results for the PEP-IIB-Factory High Energy Ring

    NASA Astrophysics Data System (ADS)

    Wienands, H.-Ulrich

    1997-05-01

    The PEP-II B-Factory High Energy Ring (HER) is a 2.2 km 9 GeV electron ring for 1 A beam current, construction of which is currently being completed at SLAC. The HER beam will collide with positrons from the 3.1 GeV, 2 A Low Energy Ring which is on a one-year later schedule. The SLAC linac will serve as high-intensity, low-emittance injector for the facility. By March 1997 the HER magnet and power system will have been installed and checked out. The vacuum system---capable of absorbing 10 MW of synchrotron radiation---will be closed and evacuated. Two initial rf stations with four cavities each, sufficient to support beams up to several hundred mA, will have been installed. The beam-position monitor (BPM) system consists of about 300 button-type BPM and is capable of single-turn data acquisition. A sophisticated beam-loss monitor system using Cherenkov detectors is capable of localizing losses over a 10-6 intensity range. A phased commissioning plan has been adopted with initial beam commissioning activities scheduled to commence in spring 1997, focusing on lattice optics diagnosis and tuning. We will present our experience checking out the various accelerator systems and our beam commissioning plans. First results of beam commissioning will be presented as they are available.

  15. Journal of Glenn T. Seaborg, Chairman of the US Atomic Energy Commission, 1961--1971

    SciTech Connect

    Seaborg, G.T.

    1989-12-01

    This book contains a very limited sampling of press clippings from my tenure as Chaiman of the Atomic Energy Commission (1961--1971). A more complete collection of these has been deposited with the Manuscript Division of the Library of Congress. This serves as an appendix to the Journal of Glenn T. Seaborg, Chairman of the Atomic Energy Commission, 1961--1971, which has been printed by the Lawrence Berkeley Laboratory in 25 volumes. Copies of this 25-volume daily journal have been deposited at the Lawrence Berkeley Laboratory, the Bancroft Library of the University of California at Berkeley, the University of California at Los Angeles Main Library, the University of California at Santa Barbara, the National Archives, the Library of Congress, and the presidential libraries of Kennedy, Johnson and Nixon.

  16. Training and Certification Program for Certified Energy Auditors (CEA) and Certified Building Commissioning Professionals (CBCP)

    SciTech Connect

    Kent, Bill

    2012-08-24

    The Association of Energy Engineers (AEE) has offered energy efficiency training and certification programs for over 30 years. During that time AEE has certified more than 22,000 professionals. All of our certification programs are the result of extensive industry research and program development and oversight by certification boards. For this project award, AEE proposed to work with the Department of Energy to utilize and extend existing industry recognized Certified Energy Auditor (CEA) and Certified Building Commissioning Professional (CBCP) programs under this Training Program Development Announcement. These expanded training programs will have significant impact in training professionals for building commissioning and energy auditing to achieve the goal of bringing existing buildings up to their optimal energy performance potential and ensuring that new buildings maintain their expected optimal level of performance. The goals and objectives of the training development project were achieved with the development of new training programs that are now being offered as self-sustaining commercial training and certification programs. These new programs are training and certifying professionals who are accomplishing the goal of increasing building energy performance in both existing and new buildings.

  17. U.S. Radioecology Research Programs of the Atomic Energy Commission in the 1950s

    SciTech Connect

    Reichle, D.E.

    2004-01-12

    This report contains two companion papers about radiological and environmental research that developed out of efforts of the Atomic Energy Commission in the late 1940s and the 1950s. Both papers were written for the Joint U.S.-Russian International Symposium entitled ''History of Atomic Energy Projects in the 1950s--Sociopolitical, Environmental, and Engineering Lessons Learned,'' which was hosted by the International Institute for Applied Systems Analysis in Laxemberg, Austria, in October 1999. Because the proceedings of this symposium were not published, these valuable historic reviews and their references are being documented as a single ORNL report. The first paper, ''U.S. Radioecology Research Programs Initiated in the 1950s,'' written by David Reichle and Stanley Auerbach, deals with the formation of the early radioecological research programs at the U.S. Atomic Energy Commission's nuclear production facilities at the Clinton Engineering Works in Oak Ridge, Tennessee; at the Hanford Plant in Richland, Washington; and at the Savannah River Plant in Georgia. These early radioecology programs were outgrowths of the environmental monitoring programs at each site and eventually developed into the world renowned National Laboratory environmental program sponsored by the Office of Biological and Environmental Research of the U.S. Department of Energy. The original version of the first paper was presented by David Reichle at the symposium. The second paper, ''U.S. Atomic Energy Commission's Environmental Research Programs Established in the 1950s,'' summarizes all the environmental research programs supported by the U.S. Atomic Energy Commission in the 1950s and discusses their present-day legacies. This paper is a modified, expanded version of a paper that was published in September 1997 in a volume commemorating the 50th anniversary symposium of the U.S. Department of Energy's Office of Biological and Environmental Research (DOE/BER). Contributors to the original

  18. Blue Ribbon Commission on America's Nuclear Future: Report to the Secretary of Energy

    SciTech Connect

    2012-01-01

    Preamble The Blue Ribbon Commission on America’s Nuclear Future (BRC) was formed by the Secretary of Energy at the request of the President to conduct a comprehensive review of policies for managing the back end of the nuclear fuel cycle and recommend a new strategy. It was co-chaired by Rep. Lee H. Hamilton and Gen. Brent Scowcroft. Other Commissioners are Mr. Mark H. Ayers, the Hon. Vicky A. Bailey, Dr. Albert Carnesale, Sen. Pete Domenici, Ms. Susan Eisenhower, Sen. Chuck Hagel, Mr. Jonathan Lash, Dr. Allison M. Macfarlane, Dr. Richard A. Meserve, Dr. Ernest J. Moniz, Dr. Per Peterson, Mr. John Rowe, and Rep. Phil Sharp. The Commission and its subcommittees met more than two dozen times between March 2010 and January 2012 to hear testimony from experts and stakeholders, to visit nuclear waste management facilities in the United States and abroad, and to discuss the issues identified in its Charter. Additionally, in September and October 2011, the Commission held five public meetings, in different regions of the country, to hear feedback on its draft report. A wide variety of organizations, interest groups, and individuals provided input to the Commission at these meetings and through the submission of written materials. Copies of all of these submissions, along with records and transcripts of past meetings, are available at the BRC website (www.brc.gov). This report highlights the Commission’s findings and conclusions and presents recommendations for consideration by the Administration and Congress, as well as interested state, tribal and local governments, other stakeholders, and the public.

  19. Report on the establishment and operation of the Federal Energy Regulatory Commission's Daycare Center

    SciTech Connect

    Not Available

    1991-09-16

    We have completed an inspection of the Federal Energy Regulatory Commission's (FERC) Daycare Center (Center). The purpose of the inspection was to review for efficiency, economy and compliance with laws and regulations, FERC's establishment and operation of the Center. The inspection objectives were to review: (1) FERC's compliance with Federal laws and requirements of the General Services Administration and the District of Columbia; (2) the source and amount of funds for establishing and operating the Center; and (3) the organizational relationships between FERC, the Center and the contractor operating the Center.

  20. South Fork Tolt River Hydroelectric Project : Adopted Portions of a 1987 Federal Energy Regulatory Commission`s Final Environmental Impact Statement.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-07-01

    The South Fork Tolt River Hydroelectric Project that world produce 6.55 average megawatts of firm energy per year and would be sited in the Snohomish River Basin, Washington, was evaluated by the Federal Energy Regulatory commission (FERC) along with six other proposed projects for environmental effects and economic feasibility Based on its economic analysis and environmental evaluation of the project, the FERC staff found that the South Fork Tolt River Project would be economically feasible and would result in insignificant Impacts if sedimentation issues could be resolved. Upon review, the BPA is adopting portions of the 1987 FERC FEIS that concern the South Fork Tolt River Hydroelectric Project and updating specific sections in an Attachment.

  1. U.S. Atomic Energy Commission's Environmental Research Programs Established in the 1950s

    SciTech Connect

    Reichle, D.E.

    1999-09-22

    In 1946 the United States (U.S.) Congress passed the Atomic Energy Act and with it created the Atomic Energy Commission. For the ensuing half-century the AEC and its successors have pursued biological and environmental research with an unwavering mandate to exploit the use of fissionable and radioactive material for medical purposes and, at the same time, to ensure the health of it's workers, the public, and the environment during energy technology development and use (AEC. 1961; DOE 1983; DOE, 1997). The following pages are testimony to the success of this undeviating vision (Figure 1). From the early days of the AEC, cooperation has also linked researchers from the national laboratories, the academic community, and the private sector. The AEC-sponsored research both at national laboratories and universities, and also supported graduate students to develop a cadre of health physicists, radiation biologists, and nuclear engineers. Coordinating these diverse performers has been crucial to the unique teaming that has made many of the successes possible. The success of the biological and environmental research program has often been shared with other federal agencies. The future will demand even stronger and more substantive intraagency, interagency, and international collaborations.

  2. Background report for the formerly utilized Manhattan Engineer District/Atomic Energy Commission sites program

    SciTech Connect

    1980-09-01

    The Department of Energy is conducting a program to determine radiological conditions at sites formerly used by the Army Corps of Engineers' Manhattan Engineer District and the Atomic Energy Commission in the early years of nuclear energy development. Also included in the program are sites used in the Los Alamos plutonium development program and the Trinity atomic bomb test site. Materials, equipment, buildings, and land became contaminated, primarily with naturally occurring radioactive nuclides. They were later decontaminated in accordance with the standards and survey methods in use at that time. Since then, however, radiological criteria, and proposed guidelines for release of such sites for unrestricted use have become more stringent as research on the effects of low-level radiation has progressed. In addition, records documenting some of these decontamination efforts cannot be found, and the final radiological conditions of the sites could not be adequately determined from the records. As a result, the Formerly Utilized Sites Program was initiated in 1974 to identify these formerly used sites and to reevaluate their radiological status. This report covers efforts through June 1980 to determine the radiological status of sites for which the existing conditions could not be clearly defined. Principal contractor facilities and associated properties have already been identified and activities are continuing to identify additional sites. Any new sites located will probably be subcontractor facilities and areas used for disposal of contractor waste or equipment; however, only limited information regarding this equipment and material has been collected to date. As additional information becomes available, supplemental reports will be published.

  3. Summary history of domestic uranium procurement under US Atomic Energy Commission contracts. Final report

    SciTech Connect

    Albrethsen, H. Jr.; McGinley, F.E.

    1982-09-01

    During the period 1947 through 1970, the Atomic Energy Commission (AEC) fostered the rapid development and expansion of the domestic uranium mining and milling industry by providing a market for uranium. Some thirty-two mills were constructed during that period to produce U/sub 3/O/sub 8/ concentrates for sale to the AEC. In addition, there were various pilot plants, concentrators, upgraders, heap leach, and solution mining facilities that operated during the period. The purpose of this report is to compile a short narrative history of the AEC's uranium concentrate procurement program and to describe briefly each of the operations that produced uranium for sale to the AEC. Contractual arrangements are described and data are given on quantities of U/sub 3/O/sub 8/ purchased and prices paid. Similar data are included for V/sub 2/O/sub 5/, where applicable. Mill and other plant operating data were also compiled from old AEC records. These latter data were provided by the companies, as a contractual requirement, during the period of operation under AEC contracts. Additionally, an effort was made to determine the present status of each facility by reference to other recently published reports. No sites were visited nor were the individual reports reviewed by the companies, many of which no longer exist. The authors relied almost entirely on published information for descriptions of facilities and milling processes utilized.

  4. Sampling and analysis plan for the former Atomic Energy Commission bus lot property

    SciTech Connect

    Nielson, R.R.

    1998-07-01

    This sampling and analysis plan (SAP) presents the rationale and strategy for the sampling and analysis activities proposed in support of an initial investigation of the former Atomic Energy Commission (AEC) bus lot property currently owned by Battelle Memorial Institute. The purpose of the proposed sampling and analysis activity is to investigate the potential for contamination above established action levels. The SAP will provide defensible data of sufficient quality and quantity to support recommendations of whether any further action within the study area is warranted. To assist in preparing sampling plans and reports, the Washington State Department of Ecology (Ecology) has published Guidance on Sampling and Data Analysis Methods. To specifically address sampling plans for petroleum-contaminated sites, Ecology has also published Guidance for Remediation of Petroleum Contaminated Sites. Both documents were used as guidance in preparing this plan. In 1992, a soil sample was taken within the current study area as part of a project to remove two underground storage tanks (USTs) at Battelle`s Sixth Street Warehouse Petroleum Dispensing Station (Section 1.3). The results showed that the sample contained elevated levels of total petroleum hydrocarbons (TPH) in the heavy distillate range. This current study was initiated in part as a result of that discovery. The following topics are considered: the historical background of the site, current site conditions, previous investigations performed at the site, an evaluation based on the available data, and the contaminants of potential concern (COPC).

  5. Implementation of dose management system at radiation protection board of Ghana Atomic Energy Commission.

    PubMed

    Hasford, F; Amoako, J K; Darko, E O; Emi-Reynolds, G; Sosu, E K; Otoo, F; Asiedu, G O

    2012-01-01

    The dose management system (DMS) is a computer software developed by the International Atomic Energy Agency for managing data on occupational exposure to radiation sources and intake of radionuclides. It is an integrated system for the user-friendly storage, processing and control of all existing internal and external dosimetry data. The Radiation Protection Board (RPB) of the Ghana Atomic Energy Commission has installed, customised, tested and using the DMS as a comprehensive DMS to improve personnel and area monitoring in the country. Personnel dose records from the RPBs database from 2000 to 2009 are grouped into medical, industrial and education/research sectors. The medical sector dominated the list of monitored institutions in the country over the 10-y period representing ∼87 %, while the industrial and education/research sectors represent ∼9 and ∼4 %, respectively. The number of monitored personnel in the same period follows a similar trend with medical, industrial and education/research sectors representing ∼74, ∼17 and ∼9 %, respectively. Analysis of dose data for 2009 showed that there was no instance of a dose above the annual dose limit of 20 mSv, however, 2.7 % of the exposed workers received individual annual doses >1 mSv. The highest recorded individual annual dose and total collective dose in all sectors were 4.73 mSv and 159.84 man Sv, respectively. Workers in the medical sector received higher individual doses than in the other two sectors, and average dose per exposed worker in all sectors is 0.25 mSv.

  6. Nuclear energy in the service of biomedicine: the U.S. Atomic Energy Commission's radioisotope program, 1946-1950.

    PubMed

    Creager, Angela N H

    2006-01-01

    The widespread adoption of radioisotopes as tools in biomedical research and therapy became one of the major consequences of the "physicists' war" for postwar life science. Scientists in the Manhattan Project, as part of their efforts to advocate for civilian uses of atomic energy after the war, proposed using infrastructure from the wartime bomb project to develop a government-run radioisotope distribution program. After the Atomic Energy Bill was passed and before the Atomic Energy Commission (AEC) was formally established, the Manhattan Project began shipping isotopes from Oak Ridge. Scientists and physicians put these reactor-produced isotopes to many of the same uses that had been pioneered with cyclotron-generated radioisotopes in the 1930s and early 1940s. The majority of early AEC shipments were radioiodine and radiophosphorus, employed to evaluate thyroid function, diagnose medical disorders, and irradiate tumors. Both researchers and politicians lauded radioisotopes publicly for their potential in curing diseases, particularly cancer. However, isotopes proved less successful than anticipated in treating cancer and more successful in medical diagnostics. On the research side, reactor-generated radioisotopes equipped biologists with new tools to trace molecular transformations from metabolic pathways to ecosystems. The U.S. government's production and promotion of isotopes stimulated their consumption by scientists and physicians (both domestic and abroad), such that in the postwar period isotopes became routine elements of laboratory and clinical use. In the early postwar years, radioisotopes signified the government's commitment to harness the atom for peace, particularly through contributions to biology, medicine, and agriculture.

  7. The Cold War legacy of regulatory risk analysis: The Atomic Energy Commission and radiation safety

    NASA Astrophysics Data System (ADS)

    Boland, Joseph B.

    From its inception in 1946 the Atomic Energy Commission pioneered the use of risk analysis as a mode of regulatory rationality and political rhetoric, yet historical treatments of risk analysis nearly always overlook the important role it played in the administration of atomic energy during the early Cold War. How this absence from history has been achieved and why it characterizes most historical accounts are the subjects of Chapter II. From there, this study goes on to develop the thesis that the advent of the atomic bomb was a world-shattering event that forced the Truman administration to choose between two novel alternatives: (1) movement towards global governance based initially on cooperative control of atomic energy or (2) unsparing pursuit of nuclear superiority. I refer to these as nuclear internationalism and nuclear nationalism, respectively. Each defined a social risk hierarchy. With the triumph of nuclear nationalism, nuclear annihilation was designated the greatest risk and a strong nuclear defense the primary means of prevention. The AEC's mission in the 1950s consisted of the rapid development of a nuclear arsenal, continual improvements in weapons technologies, and the promotion of nuclear power. The agency developed a risk-based regulatory framework through its dominant position within the National Committee on Radiation Protection. It embraced a technocratic model of risk analysis whose articulation and application it controlled, largely in secret. It used this to undergird a public rhetoric of reassurance and risk minimization. In practice, safety officials adjusted exposure levels within often wide parameters and with considerable fluidity in order to prevent safety concerns from interfering with operations. Secrecy, the political climate of the time, and a lack of accountability enabled the agency to meld technical assessments with social value judgments in a manner reflective of nuclear nationalism's risk hierarchy. In the late fifties

  8. Introduction to the journal of Glenn T. Seaborg, Chairman of the US Atomic Energy Commission, 1961--1971

    SciTech Connect

    Seaborg, G.T.

    1988-12-01

    This serves as an introduction to the 25-volume detailed daily diary kept by Glenn T. Seaborg during the time he served as Chairman of the US Atomic Energy Commission. It is a brief synopsis of some of the major issues and accomplishments of that period, 1961-1971, of US nuclear history. It is expected that the diary itself will be printed as a Lawrence Berkeley Laboratory report during the next year.

  9. Aerial Measuring System (AMS)/Israel Atomic Energy Commission (IAEC) Joint Comparison Study Report

    SciTech Connect

    Wasiolek, P.; Halevy, I.

    2013-12-23

    Under the 13th Bilateral Meeting to Combat Nuclear Terrorism conducted on January 8–9, 2013, the committee approved the development of a cost-effective proposal to conduct a Comparison Study of the Aerial Measuring System (AMS) of the U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA) and Israel Atomic Energy Commission (IAEC). The study was to be held at the Remote Sensing Laboratory (RSL), Nellis Air Force Base, Las Vegas, Nevada, with measurements at the Nevada National Security Site (NNSS). The goal of the AMS and the IAEC joint survey was to compare the responses of the two agencies’ aerial radiation detection systems to varied radioactive surface contamination levels and isotopic composition experienced at the NNSS, and the differing data processing techniques utilized by the respective teams. Considering that for the comparison both teams were using custom designed and built systems, the main focus of the short campaign was to investigate the impact of the detector size and data analysis techniques used by both teams. The AMS system, SPectral Advanced Radiological Computer System, Model A (SPARCS-A), designed and built by RSL, incorporates four different size sodium iodide (NaI) crystals: 1" × 1", 2" × 4" × 4", 2" × 4" ×16", and an “up-looking” 2" × 4" × 4". The Israel AMS System, Air RAM 2000, was designed by the IAEC Nuclear Research Center – Negev (NRCN) and built commercially by ROTEM Industries (Israel) and incorporates two 2" diameter × 2" long NaI crystals. The operational comparison was conducted at RSL-Nellis in Las Vegas, Nevada, during week of June 24–27, 2013. The Israeli system, Air RAM 2000, was shipped to RSL-Nellis and mounted together with the DOE SPARCS on a DOE Bell-412 helicopter for a series of aerial comparison measurements at local test ranges, including the Desert Rock Airport and Area 3 at the NNSS. A 4-person Israeli team from the IAEC NRCN supported the activity together with 11

  10. 18 CFR 375.101 - The Commission.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false The Commission. 375.101... OF ENERGY REVISED GENERAL RULES THE COMMISSION General Provisions § 375.101 The Commission. (a) Establishment. The Federal Energy Regulatory Commission is an independent regulatory commission within...

  11. 18 CFR 375.101 - The Commission.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false The Commission. 375.101... OF ENERGY REVISED GENERAL RULES THE COMMISSION General Provisions § 375.101 The Commission. (a) Establishment. The Federal Energy Regulatory Commission is an independent regulatory commission within...

  12. Guidelines for residential commissioning

    SciTech Connect

    Wray, Craig P.; Walker, Iain S.; Sherman, Max H.

    2003-01-31

    Currently, houses do not perform optimally or even as many codes and forecasts predict, largely because they are field assembled and there is no consistent process to identify problems or to correct them. Residential commissioning is a solution to this problem. This guide is the culmination of a 30-month project that began in September 1999. The ultimate objective of the project is to increase the number of houses that undergo commissioning, which will improve the quality, comfort, and safety of homes for California citizens. The project goal is to lay the groundwork for a residential commissioning industry in California focused on end-use energy and non-energy issues. As such, we intend this guide to be a beginning and not an end. Our intent is that the guide will lead to the programmatic integration of commissioning with other building industry processes, which in turn will provide more value to a single site visit for people such as home energy auditors and raters, home inspectors, and building performance contractors. Project work to support the development of this guide includes: a literature review and annotated bibliography, which facilitates access to 469 documents related to residential commissioning published over the past 20 years (Wray et al. 2000), an analysis of the potential benefits one can realistically expect from commissioning new and existing California houses (Matson et al. 2002), and an assessment of 107 diagnostic tools for evaluating residential commissioning metrics (Wray et al. 2002). In this guide, we describe the issues that non-experts should consider in developing a commissioning program to achieve the benefits we have identified. We do this by providing specific recommendations about: how to structure the commissioning process, which diagnostics to use, and how to use them to commission new and existing houses. Using examples, we also demonstrate the potential benefits of applying the recommended whole-house commissioning approach to

  13. Commissioning MMS

    NASA Technical Reports Server (NTRS)

    Wood, Paul; Gramling, Cheryl; Stone, John; Smith, Patrick; Reiter, Jenifer

    2016-01-01

    This paper discusses commissioning of NASAs Magnetospheric MultiScale (MMS) Mission. The mission includes four identical spacecraft with a large, complex set of instrumentation. The planning for and execution of commissioning for this mission is described. The paper concludes by discussing lessons learned.

  14. California Energy Commission Public Interest EnergyResearch/Energy System Integration -- Transmission-Planning Research&Development Scoping Project

    SciTech Connect

    Eto, Joseph H.; Lesieutre, Bernard; Widergren, Steven

    2004-07-01

    The objective of this Public Interest Energy Research (PIER)scoping project is to identify options for public-interest research and development (R&D) to improve transmission-planning tools, techniques, and methods. The information presented was gathered through a review of current California utility, California Independent System Operator (ISO), and related western states electricity transmission-planning activities and emerging needs. This report presents the project teams findings organized under six topic areas and identifies 17 distinct R&D activities to improve transmission-planning in California and the West. The findings in this report are intended for use, along with other materials, by PIER staff, to facilitate discussions with stakeholders that will ultimately lead to development of a portfolio of transmission-planning R&D activities for the PIER program.

  15. Journal of Glenn T. Seaborg (Chairman, US Atomic Energy Commission, 1961 through 1971), July 1, 1961--December 31, 1961

    SciTech Connect

    Seaborg, G.T.

    1989-01-01

    This introduction to my journal of 1961--1971, covering my years of service as Chairman of the US Atomic Energy Commission, is written from the perspective of 1971, in order to reflect the attitudes expressed in my journal, which was written on a daily basis during that period. Thus, I express the points of view of that time rather than those of today (1988), which might occasionally be somewhat different. The journal consists of 25 volumes, averaging 700 pages each. This comprises about 15,000 items consisting of the approximately 4,000 daily journal entries and the average of about three attachments per day. The journal has three sections corresponding to each of the three presidents I served as chairman of the Atomic Energy Commission -- the first six volumes covering the John F. Kennedy years (February 1, 1961--November 22, 1963), the next 11 volumes covering the Lyndon B. Johnson years (November 22, 1963--January 20, 1969) and the final eight volumes, the Richard M. Nixon years and a few months of post-AEC chairman activities in Washington (January 20, 1969--November 6, 1971).

  16. Joint Commission

    MedlinePlus

    ... Sunday 1:00 CST, November 6, 2016 Workplace Violence Prevention Resources The Joint Commission has launched “Workplace Violence Prevention Resources,” an online resource center dedicated to ...

  17. A Guide to Building Commissioning

    SciTech Connect

    Baechler, Michael C.

    2011-09-01

    Commissioning is the process of verifying that a building's heating, ventilation, and air conditioning (HVAC) and lighting systems perform correctly and efficiently. Without commissioning, system and equipment problems can result in higher than necessary utility bills and unexpected and costly equipment repairs. This report reviews the benefits of commissioning, why it is a requirement for Leadership in Energy and Environmental Design (LEED) certification, and why building codes are gradually adopting commissioning activities into code.

  18. 10 CFR 1.11 - The Commission.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false The Commission. 1.11 Section 1.11 Energy NUCLEAR REGULATORY COMMISSION STATEMENT OF ORGANIZATION AND GENERAL INFORMATION Headquarters § 1.11 The Commission. (a) The Nuclear Regulatory Commission, composed of five members, one of whom is designated by...

  19. 10 CFR 1.11 - The Commission.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false The Commission. 1.11 Section 1.11 Energy NUCLEAR REGULATORY COMMISSION STATEMENT OF ORGANIZATION AND GENERAL INFORMATION Headquarters § 1.11 The Commission. (a) The Nuclear Regulatory Commission, composed of five members, one of whom is designated by...

  20. 18 CFR 375.101 - The Commission.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false The Commission. 375.101 Section 375.101 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REVISED GENERAL RULES THE COMMISSION General Provisions § 375.101 The Commission....

  1. 18 CFR 375.101 - The Commission.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false The Commission. 375.101 Section 375.101 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REVISED GENERAL RULES THE COMMISSION General Provisions § 375.101 The Commission....

  2. 18 CFR 375.101 - The Commission.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false The Commission. 375.101 Section 375.101 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REVISED GENERAL RULES THE COMMISSION General Provisions § 375.101 The Commission....

  3. 10 CFR 110.91 - Commission consultations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Commission consultations. 110.91 Section 110.91 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) EXPORT AND IMPORT OF NUCLEAR EQUIPMENT AND MATERIAL Public Participation Procedures Concerning License Applications § 110.91 Commission consultations. The Commission...

  4. PRESTO, the on-line photon energy spectrometer at FERMI: design, features and commissioning results.

    PubMed

    Svetina, Cristian; Cocco, Daniele; Mahne, Nicola; Raimondi, Lorenzo; Ferrari, Eugenio; Zangrando, Marco

    2016-01-01

    Measurement of the emission wavelength and the spectral content of the photon radiation is essential information for both machine and experimental physicists at a free-electron laser (FEL) user facility. Knowledge of the photon beam spectral properties is needed during the machine optimization and for performing machine studies (i.e. monitoring the change of the FEL output as a function of the machine parameters). The experimentalists, on the other hand, need to know the photon beam spectral distribution of the source, shot to shot, to discriminate the acquired data. Consequently, the main requirement for the instrument, supposed to obtain this information, is the capability of working on-line and shot-to-shot, with minimal perturbation of the beam delivered to the experimental stations. Starting from the grating fundamental equations, the conceptual design of the FERMI Pulse-Resolved Energy Spectrometer: Transparent and On-line (PRESTO) is presented, explaining the optical design in detail. The performance of PRESTO, in terms of resolving power, efficiency and spectral response, is also discussed. Finally, some useful features beyond the usual measurement of the energy spectrum are reported, as they have been routinely used by both machine and experimental physicists. PMID:26698043

  5. A STUDY ON THE UNCERTAINTY FOR THE ROUTINE DOSIMETRY SERVICE AT THE LEBANESE ATOMIC ENERGY COMMISSION USING HARSHAW 8814 DOSEMETERS.

    PubMed

    Rizk, C; Vanhavere, F

    2016-09-01

    The personal dosimetry service at the Lebanese Atomic Energy Commission uses Harshaw 8814 cards with LiF:Mg,Ti detectors. The dosemeters are read in a Harshaw 6600 TLD reader. In the process of accreditation for the ISO 17025 standard((1)), different influence factors are investigated and the uncertainty has been determined. The Individual Monitoring Service Laboratory-LAEC reads the dosemeters once it receives them from the customer, and new cards are immediately given for the next wearing period. The wearing period is 2 months. The dosemeter results are reported to the customers without background subtraction. Both Hp(10) and Hp(0.07) are reported. For this paper, only the uncertainty on Hp(10) will be focussed. The following factors are taken into account for the uncertainty: calibration factor, dosemeter homogeneity and repeatability, energy and angular dependence, non-linearity, temperature dependence, etc. Also the detection limit was determined. One of the important factors is the correction for fading. This fading correction depends on the procedure used such as storage temperatures, the time-temperature profile of the read-out, pre-heat and annealing conditions. Pre- and post-irradiation fading curves were measured for a storage period up to 182 d at room temperature (15-25°C). The resulting final combined standard uncertainty on the reported doses is of the order of 24 % for doses of ∼1 mSv. PMID:26443544

  6. U.S. Nuclear Regulatory Commission Role and Activities Related to U.S. Department of Energy Incidental Waste Determinations

    SciTech Connect

    Bradford, A.H.; Esh, D.W.; Ridge, A.C.

    2006-07-01

    Section 3116 of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005 (NDAA) requires the U.S. Department of Energy (DOE) to consult with the U.S. Nuclear Regulatory Commission (NRC) for certain non-high level waste (HLW) determinations. Under the NDAA, NRC performs consultative technical reviews of DOE's waste determinations and monitors DOE's disposal actions for such waste, but the NRC does not have regulatory authority over DOE's waste disposal activities. The NDAA provides the criteria that must be met to determine that waste is not HLW. The criteria require that the waste does not need to be disposed of in a geologic repository, that highly radioactive radionuclides be removed to the maximum extent practical, and that the performance objectives of 10 CFR 61, Subpart C, be met. The performance objectives contain criteria for protection of the public, protection of inadvertent intruders, protection of workers, and stability of the disposal site after closure. This paper describes NRC's approach to implementing its responsibilities under the NDAA, as well as similar activities being performed for sites not covered by the NDAA. (authors)

  7. The role of internal and external factors in the implementation of disruptive court orders by the Federal Energy Regulatory Commission

    NASA Astrophysics Data System (ADS)

    Nagler, Peter Andrew

    A court, ordering an administrative agency to alter its practices, begins a sequence of events that may involve not only the agency but also others in its environment. Two main questions are considered in this research. The first is how does the agency actually respond to this disturbance: what does it do and why? The second is what role, if any, do influential outsiders including members of Congress, representatives of interest groups and other officials from the executive branch have in shaping the agency response to the court order? This study concentrates on the Federal Energy Regulatory Commission (FERC) and its natural gas regulations. Five court orders, issued by the District of Columbia and Fifth Circuits during the Reagan administration (1981--89), are examined in separate case studies. Five independent variables, agency commitment to its existing program, the disruptiveness of the court order, the likelihood and severity of penalties for noncompliance with the court order, agency views of the court, and external pressures on the agency, are analyzed with respect to their relative influence on the dependent variable of agency response to the court. The analysis is qualitative, marshalling facts and evidence gathered from several major data sources: FERC orders, policy statements and newsletters, trade press accounts, congressional hearings, and personal and telephone interviews conducted by the author with FERC staff and commissioners, interest group representatives, and congressional staff. The research shows that the FERC generally implemented the court orders although some evasion due at least partly to the Commission's commitment to its programs was found in four of the five cases. Agency view of the court as a legitimate authority to be obeyed was a major counter to any tendencies to evade the judicial mandates. External pressure was important only in those cases with widespread impact on the industry while disruptiveness became significant when

  8. Commission on Liberal Learning

    ERIC Educational Resources Information Center

    Hazzard, George W.

    1976-01-01

    Study emphasis within the Commission on Liberal Learning during the year was on the role of liberal education in the society of the future. The relationship of undergraduate liberal education to the world macro-problem--population growth, industrial production, food, materials and energy scarcities, pollution and environmental degradation--was…

  9. Understanding the response of commercial and institutional organizations to the California energy crisis. A report to the California Energy Commission - Sylvia Bender, Project Manager

    SciTech Connect

    Lutzenhiser, Loren; Janda, Kathryn; Kunkle, Rick; Payne, Christopher

    2002-07-24

    Beginning in the summer of 2000, California experienced serious energy supply problems, sharp increases in wholesale (and retail) electricity and natural gas prices, and isolated blackouts. In response to the rapidly worsening electricity situation in California in late 2000, the state set, as an initial goal, the reduction of the state's peak demand for the summer of 2001 by 5,000 megawatts. To meet this goal, the governor and legislature took a variety of steps to enhance supply, encourage rapid voluntary reductions in demand, and provide incentives for actions that would result in load reductions. Three bills-Assembly Bill 970, Senate Bill X1 5 and Assembly Bill X1 29-allocated roughly $950 million for consumption and demand reduction programs. The governor also enacted a variety of additional measures, including the ''Flex Your Power'' (media awareness and direct business involvement) campaign, requirements for retail sector outdoor lighting reductions, and toughening of energy efficiency building codes. There were, in fact, significant reductions in electricity demand in California during the summer of 2001 and the large number of expected supply disruptions was avoided. To understand the nature of these demand reductions and the motivations for consumer response, Washington State University (WSU) undertook a study for the California Energy Commission (CEC) focusing on conservation behavior in the residential, commercial, and agricultural sectors. The research presented in this report represents an exploration of the response of commercial and institutional organizations to the California energy situation and the unique set of influences that existed during this time. These influences included informational messages and media attention, program interventions, price changes, and external triggering events (e.g., blackouts). To better understand the effects of these influences on organizational response to the energy situation, we conducted 84 semi

  10. 75 FR 81592 - Blue Ribbon Commission on America's Nuclear Future

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-28

    ..., processing, and disposal of civilian and defense spent nuclear fuel and nuclear waste. The Commission is... Ribbon Commission on America's Nuclear Future AGENCY: Department of Energy, Office of Nuclear Energy... Commission on America's Nuclear Future (the Commission). The Commission was organized pursuant to the...

  11. 10 CFR 9.105 - Commission procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Commission procedures. 9.105 Section 9.105 Energy NUCLEAR REGULATORY COMMISSION PUBLIC RECORDS Government in the Sunshine Act Regulations § 9.105 Commission procedures. (a) Action under § 9.104 shall be taken only when a majority of the entire membership of...

  12. 10 CFR 110.113 - Commission action.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Commission action. 110.113 Section 110.113 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) EXPORT AND IMPORT OF NUCLEAR EQUIPMENT AND MATERIAL Hearings § 110.113... available at the NRC Web site, http://www.nrc.gov, and furnished to the participants. (d) The Commission...

  13. 76 FR 1608 - Blue Ribbon Commission on America's Nuclear Future

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-11

    ... Ribbon Commission on America's Nuclear Future AGENCY: Department of Energy, Office of Nuclear Energy... and nuclear waste. The Commission is scheduled to submit a draft report to the Secretary of Energy by... to CommissionDFO@nuclear.energy.gov , or post comments on the Commission Web site at...

  14. 75 FR 25850 - Blue Ribbon Commission on America's Nuclear Future

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-10

    ... Ribbon Commission on America's Nuclear Future AGENCY: Department of Energy, Office of Nuclear Energy...- 0544; e-mail CommissionDFO@nuclear.energy.gov . Additional information may also be available at http... to CommissionDFO@nuclear.energy.gov , or post comments on the Commission Web site at...

  15. 76 FR 4646 - Blue Ribbon Commission on America's Nuclear Future

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-26

    ... Ribbon Commission on America's Nuclear Future AGENCY: Department of Energy, Office of Nuclear Energy... facsimile (202) 586- 0544; e-mail CommissionDFO@nuclear.energy.gov . Additional information will be... to CommissionDFO@nuclear.energy.gov , or post comments on the Commission Web site at...

  16. Blue Ribbon Commission Tour of Hanford Site

    SciTech Connect

    Paul Saueressig

    2010-07-14

    The Blue Ribbon Commission on America's Nuclear Future toured the Department of Energy's Hanford Site on July 14, 2010. Commission members, invited guests, and members of the public visited facilities that store high-level, radioactive waste.

  17. Blue Ribbon Commission Tour of Hanford Site

    ScienceCinema

    Paul Saueressig

    2016-07-12

    The Blue Ribbon Commission on America's Nuclear Future toured the Department of Energy's Hanford Site on July 14, 2010. Commission members, invited guests, and members of the public visited facilities that store high-level, radioactive waste.

  18. Water supply for the Nuclear Rocket Development Station at the U.S. Atomic Energy Commission's Nevada Test Site

    USGS Publications Warehouse

    Young, Richard Arden

    1972-01-01

    The Nuclear Rocket Development Station, in Jackass Flats, occupies about 123 square miles in the southwestern part of the U.S. Atomic Energy Commission's Nevada Test Site. Jackass Flats, an intermontane valley bordered by highlands on all sides except for a drainage outlet in the southwestern corner, has an average annual rainfall of 4 inches. Jackass Flats is underlain by alluvium, colluvium, and volcanic rocks of Cenozoic age and, at greater depth, by sedimentary rocks of Paleozoic age. The alluvium and the colluvium lie above the saturated zone throughout nearly all of Jackass Flats. The Paleozoic sedimentary rocks contain limestone and dolomite units that are excellent water producers elsewhere ; however, these units are too deep in Jackass Flats to be economic sources of water. The only important water-producing unit known in the vicinity of the Nuclear Rocket Development Station is a welded-tuff aquifer, the Topopah Spring Member of the Paintbrush Tuff, which receives no significant recharge. This member contains about 500 feet of highly fractured rock underlying an area 11 miles long and 3 miles wide in western Jackass Flats. Permeability of the aquifer is derived mostly from joints and fractures; however, some permeability may be derived from gas bubbles in the upper part of the unit. Transmissivity, obtained from pumping tests, ranges from 68,000 to 488,000 gallons per day per foot. Volume of the saturated part of the aquifer is about 3.5 cubic miles, and the average specific yield probably ranges from 1 to 5 percent. The volume of ground water in storage is probably within the range of 37-187 billion gallons. This large amount of water should be sufficient to supply the needs of the Nuclear Rocket Development Station for many years. Water at the Nuclear Rocket Development Station is used for public supply, construction, test-cell coolant, exhaust cooling, and thermal shielding during nuclear reactor and engine testing, and washdown. Present (1967) average

  19. 75 FR 48553 - Update of the Federal Energy Regulatory Commission's Fees Schedule for Annual Charges for the Use...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-11

    ... Part 11 Electric power, Reporting and recordkeeping requirements. 0 In addition, the Commission... First Street, NE., Washington, DC 20426, (202) 502-6108. SUPPLEMENTARY INFORMATION: In FR Doc. 2010... OF THE FEDERAL POWER ACT 0 1. The authority citation for part 11 continues to read as...

  20. Nuclear Regulatory Commission issuances

    SciTech Connect

    1996-04-01

    This report includes the issuances received during the April 1996 reporting period from the Commission, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors` Decisions, and the Decisions on Petitions for Rulemaking. Included are issuances pertaining to: (1) Yankee Nuclear Power Station, (2) Georgia Tech Research Reactor, (3) River Bend Station, (4) Millstone Unit 1, (5) Thermo-Lag fire barrier material, and (6) Louisiana Energy Services.

  1. Energy- and water-development appropriations for Fiscal Year 1982. Hearings before the Committee on Appropriations, United States Senate, Ninety-Seventh Congress, First Session on H. R. 4144, an act making appropriations for energy and water development for the fiscal year ending September 30, 1982, and for other purposes. Part 2 (pages 679-1574). Department of Energy, Federal Energy Regulatory Commission, Nuclear Regulatory Commission, Tennessee Valley Authority

    SciTech Connect

    Not Available

    1981-01-01

    Part 2 of the hearing record on appropriations for the fiscal year 1982 DOE budget for certain energy and water development programs opens with remarks by Energy Secretary James B. Edwards, who summarizes the Reagan energy policy of reducing federal participation in the funding and regulation of these projects and gives an overview of DOE programs. Subsequent hearings covered the Federal Power Marketing Administration; high-energy physics and basic energy science, and magnetic fusion; nuclear fission and uranium enrichment programs, conservation and renewable energy programs; departmental and related activities; Federal Energy Regulatory Commission and Nuclear Regulatory Commission, Tennessee Valley Authority, and national security and defense programs. The record covers nine days of hearings. (DCK)

  2. 78 FR 24188 - Commission Information Collection Activities (FERC-500 and FERC-505); Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-24

    ... Energy Regulatory Commission Commission Information Collection Activities (FERC-500 and FERC- 505... Energy Regulatory Commission (Commission or FERC) is submitting the information collections Application for License/Relicense for Water Projects with Greater than 5 Megawatt Capacity (FERC-500),...

  3. 77 FR 73631 - Commission Information Collection Activities (FERC-500 and FERC-505); Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-11

    ... Energy Regulatory Commission Commission Information Collection Activities (FERC-500 and FERC- 505... Energy Regulatory Commission (Commission or FERC) is submitting the information collections Application for License/Relicense for Water Projects with Greater than 5 Megawatt Capacity (FERC-500),...

  4. Commissioning the Majorana Demonstrator

    NASA Astrophysics Data System (ADS)

    Xu, Wenqin; Majorana Collaboration

    2016-03-01

    The Majorana Demonstrator deploys high purity germanium (HPGe) detector modules to search for neutrinoless double beta (0 νββ) decay in 76Ge. The experiment is aimed at demonstrating the technical feasibility and low backgrounds for a next generation Ge-based BBz experiment. The program of testing and commissioning the Demonstrator modules is a critical step to debug and improve the experimental apparatus, to establish and refine operational procedures, and to develop data analysis tools. In this talk, we will discuss our experience commissioning the Demonstrator modules and show how this program leads to successful data-taking. This material is based upon work supported by the U.S. Department of Energy, Office of Science, Office of Nuclear Physics, the Particle Astrophysics and Nuclear Physics Programs of the National Science Foundation, and the Sanford Underground Research Facility.

  5. 77 FR 35667 - Commission Information Collection Activities (FERC-567); Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-14

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Commission Information Collection Activities (FERC-567); Comment Request AGENCY: Federal Energy Regulatory Commission, Energy. ACTION: Comment request. SUMMARY: In...

  6. 76 FR 7839 - Notice of Commission and Commission Staff Attendance at ISO/RTO Council and Regional State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-11

    ... Energy Regulatory Commission Notice of Commission and Commission Staff Attendance at ISO/RTO Council and... of the Commission and Commission staff may attend the following ISO/RTO Council and Regional State..., RTO/ISO Performance Metrics. For more information, contact Sandra Waldstein, Office of...

  7. OVERVIEW OF THE U.S. DEPARTMENT OF ENERGY AND NUCLEAR REGULATORY COMMISSION PERFORMANCE ASSESSMENT APPROACHES: CEMENTITIOUS BARRIERS PARTNERSHIP

    SciTech Connect

    Langton, C.; Burns, H.

    2009-05-29

    a need to assess the behavior of cementitious materials for applications in environmental remediation and decontamination and decommissioning (D&D) applications. The ability to assess the use and benefits of cementitious materials for these applications can significantly affect decisions related to cleanup activities. For example the need for costly remedial actions may not be necessary if existing or new cementitious barriers were adequately represented. The sections dealing with regulatory considerations include summaries of the different regulations that are relevant for various applications involving cementitious materials. A summary of regulatory guidance and/or policies pertaining to performance assessment of cementitious materials and sensitivity and uncertainty analyses is also provided in the following chapters. Numerous examples of specific applications are provided in each report. The examples are organized into traditional waste disposal applications (performance assessments), applications related to environmental remediation and D&D, and reactor and spent fuel related assessments. Sections that discuss specific facilities or sites contain: (1) descriptions of the role of the cementitious barriers or sensitivity/uncertainty analysis, (2) parameter assumptions and conceptual models, and (3) a relative discussion of the significance in the context of the assessment. Examples from both the U.S. Department of Energy Sites and the U.S. Nuclear Regulatory Commission are provided to illustrate the variety of applications and approaches that have been used. In many cases, minimal credit was taken for cementitious barriers. However, in some of those cases, benefits of being able to take credit for barriers were identified. The examples included: (1) disposal facilities (vaults, trenches, tank closures, cementitious waste forms and containers, etc.), (2) environmental remediation (old disposal facilities), (3) reactor and large structure decommissioning, and (4

  8. SSCL Commissioning and Operations

    SciTech Connect

    1992-03-31

    The SSC, with an energy of 20 TeV/Beam, requires a sequence of individual accelerators of increasing energy in the injector chain. These are the Linac, Low Energy Booster, Medium Energy Booster, and High Energy Booster. Each accelerator system must be completed in sequence in order to provide beam to the next higher energy accelerator. The collider itself is comprised of ten sectors, each of which in terms of superconducting magnet bending strength, is equivalent to two HEB injectors. The completion of all injectors and collider sectors is required before stored beams can circulate in preparation for colliding beam operation. Four experimental halls are planned for the detector systems. Each major detector will be assembled in one of the halls by a world-wide collaboration of scientists. In addition, above ground facilities provide shops and test facilities for accelerator technical systems, superconducting magnet and materials research and development, and for detector assembly and operations. The purpose of this report is to present a plan for the sequential commissioning and operation of these individual accelerators and other technical facilities of the SSC. A central objective of this plan is to describe the activities at the SSCL that are not included as part of the construction project TPC, even though they occur during the overall project construction time-frame. Examples of such activities include the operation of general laboratory facilities and services not specifically related to construction, the operating costs for the individual accelerators in the injector chain once these facilities have been commissioned, and the costs of SSCL physics research groups. The Department of Energy has provided the following decision with regard to these operations categories for the SSCL.

  9. Journal of Glenn T. Seaborg, Chairman of the US Atomic Energy Commission, 1961--1971: Volume 1, February 1, 1961--June 30, 1961

    SciTech Connect

    Seaborg, G.T.

    1989-01-01

    This introduction to my journal of 1961--1971, covering my years of service as Chairman of the US Atomic Energy Commission, is written from the perspective of 1971, in order to reflect the attitudes expressed in my journal, which was written on a daily basis during that period. Thus, I express the points of view of that time rather than those of today (1988), which might occasionally be somewhat different. The journal consists of 25 volumes, averaging 700 pages each. This comprises about 15,000 items consisting of the approximately 4000 daily entries and the average of about three attachments per day. The journal has three sections corresponding to each of the three presidents I served as chairman of the Atomic Energy Commission -- the first six volumes covering the John F. Kennedy years (February 1, 1961--November 22, 1963), the next 11 volumes covering the Lyndon B. Johnson years (November 22, 1963--January 20, 1969) and the final eight volumes, the Richard M. Nixon years and a few months of post-AEC chairman activities in Washington (January 20, 1969--November 6, 1971.)

  10. 75 FR 23262 - Notice of Attendance at the Arkansas Public Service Commission Technical Conference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-03

    ... Federal Energy Regulatory Commission Notice of Attendance at the Arkansas Public Service Commission... members and staff may attend the Arkansas Public Service Commission's technical conference in Docket No... the Arkansas Public Service Commission's Web site at...

  11. 75 FR 67958 - Blue Ribbon Commission on America's Nuclear Future

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-04

    ... Ribbon Commission on America's Nuclear Future AGENCY: Office of Nuclear Energy, Department of Energy... CommissionDFO@nuclear.energy.gov . Additional information will be available at http://www.brc.gov... cycle policies that have been established by other leading nuclear energy nations. The Commission...

  12. 76 FR 2891 - Blue Ribbon Commission on America's Nuclear Future

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-18

    ... Ribbon Commission on America's Nuclear Future AGENCY: Office of Nuclear Energy, Department of Energy...-4243 or facsimile (202) 586- 0544; e-mail CommissionDFO@nuclear.energy.gov . Additional information... and nuclear waste. The Commission is scheduled to submit a draft report to the Secretary of Energy...

  13. 75 FR 10791 - Blue Ribbon Commission on America's Nuclear Future

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-09

    ... Ribbon Commission on America's Nuclear Future AGENCY: Department of Energy, Office of Nuclear Energy...-4243 or facsimile (202) 586- 0544; e-mail CommissionDFO@nuclear.energy.gov . SUPPLEMENTARY INFORMATION... knowledge of issues pertaining to nuclear energy. Purpose of the Meeting: Inform the Commission...

  14. 77 FR 6550 - Commission Information Collection Activities (FERC-725A); Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-08

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Commission Information Collection Activities (FERC-725A); Comment Request AGENCY: Federal Energy Regulatory Commission, DOE. ACTION: Comment request. SUMMARY: In compliance...

  15. 77 FR 56636 - Commission Information Collection Activities (FERC-500 & FERC-505); Comment Request; Extension

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-13

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Commission Information Collection Activities (FERC-500 & FERC- 505); Comment Request; Extension AGENCY: Federal Energy Regulatory Commission. ACTION: Notice of information...

  16. 10 CFR 1.11 - The Commission.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false The Commission. 1.11 Section 1.11 Energy NUCLEAR.... (a) The Nuclear Regulatory Commission, composed of five members, one of whom is designated by the... for licensing and regulating nuclear facilities and materials and for conducting research in...

  17. 10 CFR 1.11 - The Commission.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false The Commission. 1.11 Section 1.11 Energy NUCLEAR.... (a) The Nuclear Regulatory Commission, composed of five members, one of whom is designated by the... for licensing and regulating nuclear facilities and materials and for conducting research in...

  18. 10 CFR 1.11 - The Commission.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., protecting and safeguarding nuclear materials and nuclear power plants in the interest of national security... 10 Energy 1 2010-01-01 2010-01-01 false The Commission. 1.11 Section 1.11 Energy NUCLEAR.... (a) The Nuclear Regulatory Commission, composed of five members, one of whom is designated by...

  19. Monitoring distant fallout: the role of the Atomic Energy Commission Health and Safety Laboratory during the Pacific tests, with special attention to the events following BRAVO.

    PubMed

    Eisenbud, M

    1997-07-01

    The fallout from test BRAVO in March 1954 has had scientific, political, and social implications that have continued for more than 40 years. The test resulted in serious injury to the people of the Marshall Islands and 23 men on a nearby Japanese fishing boat. Prior to BRAVO there was insufficient appreciation of the dangers of fallout to people living downwind from surface or near-surface explosions of megaton weapons. In the absence of sufficient preplanning for fallout monitoring beyond the test-sites of earlier smaller yield tests, and as a result of the concern of the photographic film manufacturers, the Atomic Energy Commission Health and Safety Laboratory, now the Department of Energy Environmental Measurements Laboratory, was requested to develop a program of fallout surveillance. Beginning with Operation IVY in 1952, these surveys included aerial monitoring of the islands of the mid and western Pacific, as well as establishment of fallout monitoring stations in the United States and abroad. The first evidence of the post-BRAVO fallout was detected by a Atomic Energy Commission Health and Safety Laboratory instrument installed on the atoll of Rongerik, where 28 military personnel were stationed. The results of radiation surveys conducted immediately after BRAVO, as well as the reports of medical investigations, radioecological studies, and dose reconstruction that have been conducted by many laboratories over the years have been available from the beginning in unclassified form. However, from the time of the fallout, and continuing to the present, there have been many unanswered questions about what happened during the hours immediately after the fallout was reported. No formal investigation of the circumstances of the fallout was ever conducted, and there were serious misrepresentations of the facts in the official statements made at the time.

  20. 75 FR 1362 - Medical Area Total Energy Plant, Inc., New MATEP Inc.; Notice of Application for Commission...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-11

    .... The facility is a central district energy plant located in the Longwood Medical and Academic Area of... 20426. This filing is accessible online at http://www.ferc.gov , using the ``eLibrary'' link and...

  1. Economic Commission Report

    ERIC Educational Resources Information Center

    American Indian Journal, 1977

    1977-01-01

    Summarizing presentations and discussions of the Economic Commission of the International Non-Governmental Organizations Conference on Discrimination Against Indigenous Populations (1977), this report addresses: multinational corporations; the land question; and the Commission's recommended "Plan of Action". (JC)

  2. Preliminary Analysis on Linac Oscillation Data LI05-19 and Wake Field Energy Loss in FACET Commissioning 2012

    SciTech Connect

    Sun, Yipeng; /SLAC

    2012-07-23

    In this note, preliminary analysis on linac ocsillation data in FACET linac LI05-09 plus LI11-19 is presented. Several quadrupoles are identified to possibly have different strength, compared with their designed strength in the MAD optics model. The beam energy loss due to longitudinal wake fields in the S-band linac is also analytically calculated, also by LITRACK numerical simulations.

  3. 18 CFR 2.1c - Policy statement on consultation with Indian tribes in Commission proceedings.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL RULES GENERAL POLICY AND... proceedings involving hydroelectric projects, by river basins. (g) The Commission will strive to develop... regarding the licensing of hydroelectric projects. In this connection, the Commission sets forth...

  4. 18 CFR 2.1c - Policy statement on consultation with Indian tribes in Commission proceedings.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL RULES GENERAL POLICY AND... proceedings involving hydroelectric projects, by river basins. (g) The Commission will strive to develop... regarding the licensing of hydroelectric projects. In this connection, the Commission sets forth...

  5. 18 CFR 2.1c - Policy statement on consultation with Indian tribes in Commission proceedings.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL RULES GENERAL POLICY AND... proceedings involving hydroelectric projects, by river basins. (g) The Commission will strive to develop... regarding the licensing of hydroelectric projects. In this connection, the Commission sets forth...

  6. 18 CFR 2.1c - Policy statement on consultation with Indian tribes in Commission proceedings.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL RULES GENERAL POLICY AND... proceedings involving hydroelectric projects, by river basins. (g) The Commission will strive to develop... regarding the licensing of hydroelectric projects. In this connection, the Commission sets forth...

  7. Experiments in progress: The geography of science in the Atomic Energy Commission's peaceful uses of nuclear explosives program, 1956-1973

    NASA Astrophysics Data System (ADS)

    Kirsch, Scott Lawrence

    From 1957 to 1973, the United States Atomic Energy Commission (AEC) actively pursued the "peaceful uses of nuclear explosives" through Project Plowshare. Nuclear excavation, the detonation of shallowly buried hydrogen bombs for massive earthmoving projects like harbors and canals, was considered the most promising of the Plowshare applications, and for a time, the most economically and technically "feasible." With a basis in and contributing to theory in critical human geography and science studies, the purpose of this dissertation is to examine the collisions of science, ideology, and politics which kept Plowshare designs alive--but only as "experiments in progress." That is, this research asks how the experimental program persisted in places like the national weapons laboratory in Livermore, California, and how its ideas were tested at the nuclear test site in Nevada, yet Plowshare was kept out of those spaces beyond AEC control. Primary research focuses on AEC-related archival materials collected from the Department of Energy Coordination and Information Center, Las Vegas, Nevada, and from the Lawrence Livermore National Laboratory, as well as the public discourse through which support for and opposition to Plowshare projects was voiced. Through critical analysis of Plowshare's grandiose "geographical engineering" schemes, I thus examine the complex relations between the social construction of science and technology, on one hand, and the social production of space, on the other.

  8. Solid cancer mortality associated with chronic external radiation exposure at the French atomic energy commission and nuclear fuel company.

    PubMed

    Metz-Flamant, C; Samson, E; Caër-Lorho, S; Acker, A; Laurier, D

    2011-07-01

    Studies of nuclear workers make it possible to directly quantify the risks associated with ionizing radiation exposure at low doses and low dose rates. Studies of the CEA (Commissariat à l'Energie Atomique) and AREVA Nuclear Cycle (AREVA NC) cohort, currently the most informative such group in France, describe the long-term risk to nuclear workers associated with external exposure. Our aim is to assess the risk of mortality from solid cancers among CEA and AREVA NC nuclear workers and its association with external radiation exposure. Standardized mortality ratios (SMRs) were calculated and internal Poisson regressions were conducted, controlling for the main confounding factors [sex, attained age, calendar period, company and socioeconomic status (SES)]. During the period 1968-2004, there were 2,035 solid cancers among the 36,769 CEA-AREVA NC workers. Cumulative external radiation exposure was assessed for the period 1950-2004, and the mean cumulative dose was 12.1 mSv. Mortality rates for all causes and all solid cancers were both significantly lower in this cohort than in the general population. A significant excess of deaths from pleural cancer, not associated with cumulative external dose, was observed, probably due to past asbestos exposure. We observed a significant excess of melanoma, also unassociated with dose. Although cumulative external dose was not associated with mortality from all solid cancers, the central estimated excess relative risk (ERR) per Sv of 0.46 for solid cancer mortality was higher than the 0.26 calculated for male Hiroshima and Nagasaki A-bomb survivors 50 years or older and exposed at the age of 30 years or older. The modification of our results after stratification for SES demonstrates the importance of this characteristic in occupational studies, because it makes it possible to take class-based lifestyle differences into account, at least partly. These results show the great potential of a further joint international study of

  9. 10 CFR 9.107 - Public announcement of Commission meetings.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Public announcement of Commission meetings. 9.107 Section 9.107 Energy NUCLEAR REGULATORY COMMISSION PUBLIC RECORDS Government in the Sunshine Act Regulations... if: (1) A majority of the entire membership of the Commission determines by a recorded vote...

  10. 76 FR 25685 - Orlando Utilities Commission; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-05

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Orlando Utilities Commission; Notice of Filing Take notice that on April 15, 2011, Orlando Utilities Commission submitted its tariff filing per 35.25(e): Order 890 compliance to...

  11. 76 FR 35209 - Orlando Utilities Commission; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-16

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Orlando Utilities Commission; Notice of Filing Take notice that on May 26, 2011, Orlando Utilities Commission submitted its tariff filing per 35.17(b): Amendment to...

  12. 75 FR 37789 - Orlando Utilities Commission; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-30

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Orlando Utilities Commission; Notice of Filing June 23, 2010. Take notice that on June 11, 2010, the Orlando Utilities Commission filed, pro forma revised tariff sheets...

  13. 76 FR 49469 - Orlando Utilities Commission; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-10

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Orlando Utilities Commission; Notice of Filing Take notice that on July 29, 2011, Orlando Utilities Commission (OUC), pursuant to section 205 of the Federal Power Act (FPA)...

  14. 78 FR 78352 - Orlando Utilities Commission; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-26

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Orlando Utilities Commission; Notice of Filing Take notice that on December 18, 2013, Orlando Utilities Commission submitted its tariff filing per 35.28(e): Order No....

  15. Coordination of the U.S. DOE-Argentine National Atomic Energy Commission (CNEA) science and technology implementing arrangement. Final report

    SciTech Connect

    Ebadian, M.A.

    1998-01-01

    In 1989, the US Department of Energy (DOE) established the Office of Environmental Management (EM) and delegated to the office the responsibility of cleaning up the US nuclear weapons complex. EM`s mission has three primary activities: (1) to assess, remediate, and monitor contaminated sites and facilities; (2) to store, treat, and dispose of wastes from past and current operations; and (3) to develop and implement innovative technologies for environmental remediation. To this end, EM has established domestic and international cooperative technology development programs, including one with the Republic of Argentina. Cooperating with Argentine scientific institutes and industry meets US cleanup objectives by: (1) identifying and accessing Argentine EM-related technologies, thereby leveraging investments and providing cost-savings; (2) improving access to technical information, scientific expertise, and technologies applicable to EM needs; and (3) fostering the development of innovative environmental technologies by increasing US private sector opportunities in Argentina in EM-related areas. Florida International University`s Hemispheric Center for Environmental Technology (FIU-HCET) serves as DOE-OST`s primary technology transfer agent. FIU-HCET acts as the coordinating and managing body for the Department of Energy (DOE)-Argentina National Atomic Energy Commission (CNEA) Arrangement. Activities include implementing standard operating procedures, tracking various technical projects, hosting visiting scientists, advising DOE of potential joint projects based on previous studies, and demonstrating/transferring desired technology. HCET hosts and directs the annual Joint Coordinating Committee for Radioactive and Mixed Waste Management meeting between the DOE and CNEA representatives. Additionally, HCET is evaluating the possibility of establishing similar arrangements with other Latin American countries.

  16. Commission 10: Solar Activity

    NASA Astrophysics Data System (ADS)

    van Driel-Gesztelyi, Lidia; Schrijver, Carolus J.; Klimchuk, James A.; Charbonneau, Paul; Fletcher, Lyndsay; Hasan, S. Sirajul; Hudson, Hugh S.; Kusano, Kanya; Mandrini, Cristina H.; Peter, Hardi; Vršnak, Bojan; Yan, Yihua

    2012-04-01

    Commission 10 of the International Astronomical Union has more than 650 members who study a wide range of activity phenomena produced by our nearest star, the Sun. Solar activity is intrinsically related to solar magnetic fields and encompasses events from the smallest energy releases (nano- or even picoflares) to the largest eruptions in the Solar System, coronal mass ejections (CMEs), which propagate into the Heliosphere reaching the Earth and beyond. Solar activity is manifested in the appearance of sunspot groups or active regions, which are the principal sources of activity phenomena from the emergence of their magnetic flux through their dispersion and decay. The period 2008-2009 saw an unanticipated extended solar cycle minimum and unprecedentedly weak polar-cap and heliospheric field. Associated with that was the 2009 historical maximum in galactic cosmic rays flux since measurements begun in the middle of the 20th Century. Since then Cycle 24 has re-started solar activity producing some spectacular eruptions observed with a fleet of spacecraft and ground-based facilities. In the last triennium major advances in our knowledge and understanding of solar activity were due to continuing success of space missions as SOHO, Hinode, RHESSI and the twin STEREO spacecraft, further enriched by the breathtaking images of the solar atmosphere produced by the Solar Dynamic Observatory (SDO) launched on 11 February 2010 in the framework of NASA's Living with a Star program. In August 2012, at the time of the IAU General Assembly in Beijing when the mandate of this Commission ends, we will be in the unique position to have for the first time a full 3-D view of the Sun and solar activity phenomena provided by the twin STEREO missions about 120 degrees behind and ahead of Earth and other spacecraft around the Earth and ground-based observatories. These new observational insights are continuously posing new questions, inspiring and advancing theoretical analysis and

  17. The Building Commissioning Handbook.

    ERIC Educational Resources Information Center

    Heinz, John A.; Casault, Rick

    This book discusses building commissioning, which is the process of certifying that a new facility meets the required specifications. As buildings have become more complex, the traditional methods for building start-up and final acceptance have been proven inadequate, and building commissioning has been developed, which often necessitates the use…

  18. Get into Commission

    ERIC Educational Resources Information Center

    Limback, Derek

    2012-01-01

    Teachers may be apprehensive about commissioning, and frequently directors do not see it as realistic for their programs. It took the author a while to commission a piece, even though he is often on the composer side. The author asserts that there's already plenty of high-quality literature out there to keep teachers busy, but a bigger factor is…

  19. THE COLLEGE COMMISSIONS.

    ERIC Educational Resources Information Center

    FOOKS, JOYCE LANE

    THE HISTORIES, ORGANIZATIONAL STRUCTURES, MODES OF OPERATION, GOALS, AND SPECIFIC ACTIVITIES OF EIGHT COLLEGE SCIENCE COMMISSIONS ARE PRESENTED. THE GOAL OF THE EIGHT COLLEGE SCIENCE COMMISSIONS IS TO BRING UNDERGRADUATE SCIENCE INSTRUCTION CLOSER TO THE RESEARCH FRONTIER, UPDATE COURSES, AND FOSTER THE SPIRIT OF INQUIRY. INTERCOMMISSION…

  20. 76 FR 1607 - Blue Ribbon Commission on America's Nuclear Future

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-11

    ... Ribbon Commission on America's Nuclear Future AGENCY: Department of Energy, Office of Nuclear Energy...) 586-4243 or facsimile (202) 586- 0544; e-mail CommissionDFO@nuclear.energy.gov . Additional.... Department of Energy, 1000 Independence Avenue, SW., Washington, DC 20585, e-mail to...

  1. 76 FR 79674 - Benjamin Riggs v. Rhode Island Public Utility Commission; Notice of Complaint

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-22

    ... 206 of the Rules of Practice and Procedure of the Federal Energy Regulatory Commission (Commission... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Benjamin Riggs v. Rhode Island Public Utility Commission; Notice...

  2. 76 FR 61686 - Louisiana Public Service Commission v. Entergy Corporation, Entergy Services, Inc., Entergy...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-05

    ... Energy Regulatory Commission Louisiana Public Service Commission v. Entergy Corporation, Entergy Services... Louisiana Public Service Commission (Complainant) filed a complaint against Entergy Corporation, Entergy Services, Inc., Entergy Louisiana, LLC, Entergy Arkansas, Inc., Entergy Mississippi, Inc., Entergy...

  3. 76 FR 58804 - Notice of Complaint; Louisiana Public Service Commission v. Entergy Corporation, Entergy Services...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-22

    ... Energy Regulatory Commission Notice of Complaint; Louisiana Public Service Commission v. Entergy Corporation, Entergy Services, Inc., Entergy Louisiana, LLC, Entergy Arkansas, Inc., Entergy Mississippi, Inc... September 14, 2011, the Louisiana Public Service Commission (Complainant) filed a formal complaint...

  4. Investigation of the persistence of new building commissioning

    SciTech Connect

    Potter, Amanda; Friedman, Hannah; Haasl, Tudi; Claridge, David

    2002-03-17

    Commissioning is gaining increasing recognition as a cost-effective strategy for reducing commercial building energy use. Although the success and cost-effectiveness of commissioning projects depends on how well the benefits of commissioning persist over time, this aspect of commissioning is not well understood. The persistence of commissioning benefits was recently studied in a PIER project evaluating ten buildings that were commissioned at building start-up at least two years ago. The researchers examined the commissioning reports, control algorithms, EMCS point measurements, and energy use data, and conducted operator and commissioning provider interviews to investigate the persistence of commissioning benefits. In addition, they conducted site visits in a sample of the buildings. A set of commissioning measures was selected for each building to compare the persistence of benefits. Persistence was measured both qualitatively through a discussion of occupant comfort and decreased maintenance and quantitatively through estimations of energy savings. This paper reports the results of the study. The discussion includes how well the benefits of commissioning persisted over time, reasons for declining performance, and methods for improving persistence. The results provide valuable insight into how to estimate the persistence of commissioning information central to the cost benefit analyses routinely performed for commissioning measures.

  5. Commission 53: Extrasolar Planets

    NASA Astrophysics Data System (ADS)

    Boss, Alan; Lecavelier des Etangs, Alain; Mayor, Michel; Bodenheimer, Peter; Collier-Cameron, Andrew; Kokubo, Eiichiro; Mardling, Rosemary; Minniti, Dante; Queloz, Didier

    2012-04-01

    Commission 53 was created at the 2006 Prague General Assembly (GA) of the IAU, in recognition of the outburst of astronomical progress in the field of extrasolar planet discovery, characterization, and theoretical work that has occurred since the discovery of the first planet in orbit around a solar-type star in 1995. Commission 53 is the logical successor to the IAU Working Group on Extrasolar Planets (WGESP), which ended its six years of existence in August 2006. The founding President of Commission 53 was Michael Mayor, in honor of his seminal contributions to this new field of astronomy. The current President is Alan Boss, the former chair of the WGESP. The current members of the Commission 53 (C53) Organizing Committee (OC) began their service in August 2009 at the conclusion of the Rio de Janeiro IAU GA.

  6. Nuclear Regulatory Commission Issuances

    SciTech Connect

    1996-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM).

  7. Nuclear Regulatory Commission issuances

    SciTech Connect

    Not Available

    1994-03-01

    This report includes the issuances received during the specified period from Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

  8. Commissioning the LCLS Injector

    SciTech Connect

    Akre, R.; Dowell, D.; Emma, P.; Frisch, J.; Gilevich, S.; Hays, G.; Hering, Ph.; Iverson, R.; Limborg-Deprey, C.; Loos, H.; Miahnahri, A.; Schmerge, J.; Turner, J.; Welch, J.; White, W.; Wu, J.; /SLAC

    2007-11-28

    The Linac Coherent Light Source (LCLS) is a SASE x-ray Free-Electron Laser (FEL) project presently under construction at SLAC. The injector section, from drive laser and RF photocathode gun through first bunch compressor chicane, was installed in fall 2006. Initial system commissioning with an electron beam was completed in August 2007, with the goal of a 1.2-micron emittance in a 1-nC bunch clearly demonstrated. The second phase of commissioning, including second bunch compressor and full linac, is planned for 2008, with FEL commissioning in 2009. We report experimental results and experience gained in the first phase of commissioning, including the photo-cathode drive laser, RF gun, photocathode, S-band and X-band RF systems, first bunch compressor, and the various beam diagnostics.

  9. 78 FR 7427 - Council of the City of New Orleans; Mississippi Public Service Commission; Arkansas Public...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-01

    ... Federal Energy Regulatory Commission Council of the City of New Orleans; Mississippi Public Service Commission; Arkansas Public Service Commission; Notice of Petition for Declaratory Order Take notice that on... Public Service Commission and the Arkansas Public Service Commission (together, the Entergy...

  10. Commission 4: Ephemerides

    NASA Astrophysics Data System (ADS)

    Fukushima, Toshio; Kaplan, George H.; Krasinsky, George A.; Arlot, Jean-Eudes; Bangert, John A.; Hohenkerk, Catherine; Lara, Martin; Pitjeva, Elena V.; Urban, Sean E.; Vondrak, Jan

    2010-05-01

    Dr. George Kaplan, the current Vice-President of the Commission was nominated to be the new President. Dr. Catherine Hohenkerk was elected to be the next Vice-President of the Commission. As for the Membership of the Organizing Committee, Dr. Vondrak stepped down and Drs William Folkner of JPL and Steve Bell of HMNAO have been added. In the below, we present summaries of the reports from various institutions presented at the business session.

  11. 75 FR 70726 - Commission Information Collection Activities (FERC-511 and FERC-515); Comment Request; Submitted...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-18

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Commission Information Collection Activities (FERC-511 and FERC- 515); Comment Request; Submitted for OMB Review November 10, 2010. AGENCY: Federal Energy Regulatory...

  12. 18 CFR 35.27 - Authority of State commissions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... distribution of such electric energy to retail consumers for purposes established in accordance with State law. ... commissions. 35.27 Section 35.27 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT FILING OF RATE SCHEDULES AND...

  13. 18 CFR 35.27 - Authority of State commissions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... distribution of such electric energy to retail consumers for purposes established in accordance with State law. ... commissions. 35.27 Section 35.27 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT FILING OF RATE SCHEDULES AND...

  14. Commissioning Experience of SNS

    SciTech Connect

    Plum, Michael A

    2007-07-01

    The Spallation Neutron Source accelerator complex consists of a 2.5 MeV H{sup -} front-end injector system, a 186 MeV normal-conducting linear accelerator, a 1 GeV superconducting linear accelerator, an accumulator ring, and associated beam transport lines. The linac was commissioned in five discrete runs, starting in 2002 and completed in 2005. The accumulator ring and associated beam transport lines were commissioned in two runs in January-February and April 2006. With the completed commissioning of the SNS accelerator, the facility has begun initial low-power operations. In the course of beam commissioning, most beam performance parameters and beam intensity goals have been achieved at low duty factor. A number of beam dynamics measurements have been performed, including emittance evolution, transverse coupling in the ring, beam instability thresholds, and beam distributions on the target. The commissioning results, achieved beam performance and initial operating experience of the SNS linac will be presented.

  15. Activities with Argentina. Spring 1999. A U.S. Department of Energy Cooperative Program with the National Atomic Energy Commission of the Argentine Republic

    SciTech Connect

    1999-06-01

    In 1989, the US Department of Energy (DOE) responded to the need to redirect resources from weapons production to environmental restoration and waste management by establishing the Office of Environmental Management (EM) and delegated to this office the responsibility of cleaning up the US nuclear weapons complex. Now in its eight year, EM`s mission has three central facets: (1) to assess, remediate, and monitor contaminated sites and facilities; (2) to store, treat, and dispose of waste from past and current operations; and (3) to develop and implement innovative technologies for environmental cleanup. To this end, EM has established domestic and international cooperative technology development programs, including one with the Republic of Argentina. Cooperating with Argentine scientific institutes and industries meets US cleanup objectives by: (1) identifying and accessing Argentine EM-related technologies, thereby leveraging investments and providing cost-savings; (2) improving access to technical information, scientific expertise, and technologies applicable to EM needs; and (3) fostering the development of innovative environmental technologies by increasing US private sector opportunities in Argentina in EM-related areas.

  16. Commissioning of CEBAF

    SciTech Connect

    Andrew Hutton

    1994-06-01

    Construction of the CEBAF accelerator, a 4 GeV CW recirculating linac, is virtually complete. The 338 power sources and superconducting RF cavities, which have all run above nominal operating gradient in vertical tests (average 10.7 MeV/m), are installed. All the major components of the nine recirculation arcs are installed and aligned. Pre-commissioning was performed in parallel with construction. Ninety-nine superconducting cavities were operated simultaneously at the nominal gradient of 5 MeV/m. A maximum beam current of 110 PA CW (ZOO PA design) was reached. A cryomodule with eight cavities has operated at 8 MeV/m. Commissioning of the entire machine began in May 94. Results obtained during commissioning of the two linacs and the first arc are presented. 600 MeV beam is ready to be brought to the first experimental hall meeting a DOE milestone established in 1988.

  17. 78 FR 24187 - Commission Information Collection Activities (FERC Form 6-Q); Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-24

    ... Energy Regulatory Commission Commission Information Collection Activities (FERC Form 6-Q); Comment... Energy Regulatory Commission (Commission or FERC) is submitting the information collection FERC Form 6-Q... issued a Notice in the Federal Register (78 FR 8500, 2/6/2013) requesting public comments. FERC...

  18. ATF2 Commissioning

    SciTech Connect

    Seryi, A.; Christian, G.; Parker, B.; Schulte, D.; Delahaye, J.-P.; Tomas, R.; Zimmermann, F.; Wolski, A.; Elsen, E.; Sanuki, T.; Gianfelice-Wendt, E.; Ross, M.; Wendt, M.; Takahashi, T.; Bai, S.; Gao, J.; Bolzon, B.; Geffroy, N.; Jeremie, A.; Apsimon, R.; Burrows, P.; /Oxford U., JAI /Kyoto U., Inst. Chem. Res. /Kyungpook Natl. U. /Orsay, LAL /Phang Accelerator Lab /Royal Holloway, U. of London /SLAC /Daresbury /University Coll. London /Manchester U. /Univ. of Tokyo U.

    2009-10-30

    ATF2 is a final-focus test beam line that aims to focus the low-emittance beam from the ATF damping ring to a beam size of about 37 nm, and at the same time to demonstrate nm beam stability, using numerous advanced beam diagnostics and feedback tools. The construction has been finished at the end of 2008 and the beam commissioning of ATF2 has started in December of 2008. ATF2 is constructed and commissioned by ATF international collaborations with strong US, Asian and European participation.

  19. Commissioning Measurements of ORRUBA Detectors

    NASA Astrophysics Data System (ADS)

    Matthews, C. T.; Cizewski, J. A.; O'Malley, P. D.; Pain, S. D.

    2008-10-01

    The Oak Ridge Rutgers University Barrel Array (ORRUBA) is a silicon detector array being developed by the Center of Excellence for Stewardship Science at Oak Ridge National Laboratory. The array is comprised of two rings of position-sensitive detectors in a cylindrical setup designed to maximize solid angle coverage for (d,p) measurements in inverse kinematics. Each detector has 4 resistive strips, with readout from each strip-end. At forward angles, detector telescopes are used, comprised of a thin non-resistive detector (65μm) for transmission backed by the thicker resistive detector (1000μm) for stopping, allowing particle identification in addition to measurement of the angle and energy of the detected particles. For commissioning, the profile of each detector must be tested to insure that it is functioning properly, and to understand its optimal bias voltage and energy resolution. Measurements of leakage current profiles, full-depletion voltages and energy resolution measurements have been completed. The details of the array, its motivation and these commissioning measurements will be reported.

  20. 78 FR 12412 - Commission Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-22

    ... Commission on February 14, 2013, and identified in the notice for such hearing, which was published in 78 FR... From the Federal Register Online via the Government Publishing Office ] SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY:...

  1. 77 FR 70204 - Commission Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-23

    ... Commission on November 15, 2012, and identified in the notice for such hearing, which was published in 77 FR... From the Federal Register Online via the Government Publishing Office SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY:...

  2. Nuclear Regulatory Commission issuances

    SciTech Connect

    1997-11-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance.

  3. Nuclear Regulatory Commission Issuances

    SciTech Connect

    Not Available

    1981-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

  4. Nuclear Regulatory Commission issuances

    SciTech Connect

    1997-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance.

  5. 75 FR 51025 - Blue Ribbon Commission on America's Nuclear Future, Reactor and Fuel Cycle Technology Subcommittee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-18

    ...: Department of Energy, Office of Nuclear Energy. ACTION: Notice of open meeting. SUMMARY: This notice...- 0544; e-mail CommissionDFO@nuclear.energy.gov . Additional information will be available at http://www... to CommissionDFO@nuclear.energy.gov , or post comments on the Commission Web site at...

  6. Potential Benefits of Commissioning California Homes

    SciTech Connect

    Matson, Nance; Wray, Craig; Walker, Iain; Sherman, Max

    2002-01-01

    Commissioning California's houses can result in better performing systems and houses. In turn, this will result in more efficient use of energy, carbon emission reductions, and improved occupant comfort. In particular, commissioning houses can save a significant amount of HVAC-related energy (15 to 30% in existing houses, 10 to 20% in new conventional houses, and up to 8% in advanced energy efficiency houses). The process that we considered includes corrective measures that could be implemented together during construction or during a single site visit (e.g., air tightening, duct sealing, and refrigerant and air handler airflow corrections in a new or existing house). Taking advantage of additional, more complex opportunities (e.g., installing new windows in an existing house, replacing the heating and air conditioning system in a new or existing house) can result in additional HVAC-related energy savings (60 to 75% in existing houses, and 50 to 60% in new conventional houses). The commissioning-related system and house performance improvements and energy savings translate to additional benefits throughout California and beyond. By applying commissioning principles to their work, the building community (builders and contractors) benefit from reduced callbacks and lower warranty costs. HERS raters and inspectors will have access to an expanded market sector. As the commissioning process rectifies construction defects and code problems, building code officials benefit from better compliance with codes. The utilities benefit from reduced peak demand, which can translate into lower energy acquisition costs. As houses perform closer to expectations, governmental bodies (e.g., the California Energy Commission and the Air Resources Board) benefit from greater assurance that actual energy consumption and carbon emissions are closer to the levels mandated in codes and standards, resulting in better achievement of state energy conservation and environmental goals. California

  7. 10 CFR 51.100 - Timing of Commission action.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... issuance of a permit, license, or other form of permission, or amendment to or renewal of a permit, license... 10 Energy 2 2012-01-01 2012-01-01 false Timing of Commission action. 51.100 Section 51.100 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING...

  8. 10 CFR 51.100 - Timing of Commission action.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... issuance of a permit, license, or other form of permission, or amendment to or renewal of a permit, license... 10 Energy 2 2013-01-01 2013-01-01 false Timing of Commission action. 51.100 Section 51.100 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING...

  9. 10 CFR 51.100 - Timing of Commission action.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... issuance of a permit, license, or other form of permission, or amendment to or renewal of a permit, license... 10 Energy 2 2011-01-01 2011-01-01 false Timing of Commission action. 51.100 Section 51.100 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING...

  10. 10 CFR 140.22 - Commission guarantee and reimbursement agreements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... required to have and maintain financial protection for each nuclear reactor as determined in § 140.11(a)(4... 10 Energy 2 2014-01-01 2014-01-01 false Commission guarantee and reimbursement agreements. 140.22 Section 140.22 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) FINANCIAL PROTECTION REQUIREMENTS...

  11. 10 CFR 140.22 - Commission guarantee and reimbursement agreements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... required to have and maintain financial protection for each nuclear reactor as determined in § 140.11(a)(4... 10 Energy 2 2012-01-01 2012-01-01 false Commission guarantee and reimbursement agreements. 140.22 Section 140.22 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) FINANCIAL PROTECTION REQUIREMENTS...

  12. 10 CFR 140.22 - Commission guarantee and reimbursement agreements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... required to have and maintain financial protection for each nuclear reactor as determined in § 140.11(a)(4... 10 Energy 2 2011-01-01 2011-01-01 false Commission guarantee and reimbursement agreements. 140.22 Section 140.22 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) FINANCIAL PROTECTION REQUIREMENTS...

  13. 10 CFR 140.22 - Commission guarantee and reimbursement agreements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... required to have and maintain financial protection for each nuclear reactor as determined in § 140.11(a)(4... 10 Energy 2 2013-01-01 2013-01-01 false Commission guarantee and reimbursement agreements. 140.22 Section 140.22 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) FINANCIAL PROTECTION REQUIREMENTS...

  14. 10 CFR 140.22 - Commission guarantee and reimbursement agreements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... required to have and maintain financial protection for each nuclear reactor as determined in § 140.11(a)(4... 10 Energy 2 2010-01-01 2010-01-01 false Commission guarantee and reimbursement agreements. 140.22 Section 140.22 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) FINANCIAL PROTECTION REQUIREMENTS...

  15. 18 CFR 1b.8 - Requests for Commission investigations.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Requests for Commission investigations. 1b.8 Section 1b.8 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL RULES RULES RELATING TO INVESTIGATIONS § 1b.8 Requests for...

  16. 18 CFR 1b.8 - Requests for Commission investigations.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Requests for Commission investigations. 1b.8 Section 1b.8 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL RULES RULES RELATING TO INVESTIGATIONS § 1b.8 Requests for...

  17. 18 CFR 1b.8 - Requests for Commission investigations.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Requests for Commission investigations. 1b.8 Section 1b.8 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL RULES RULES RELATING TO INVESTIGATIONS § 1b.8 Requests for...

  18. 18 CFR 1b.8 - Requests for Commission investigations.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Requests for Commission investigations. 1b.8 Section 1b.8 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL RULES RULES RELATING TO INVESTIGATIONS § 1b.8 Requests for...

  19. 78 FR 28583 - Coordination Between Natural Gas and Electricity Markets; Notice of Commission Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-15

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Coordination Between Natural Gas and Electricity Markets; Notice of... necessary. Commission members will be present. \\1\\ Coordination between Natural Gas and Electricity...

  20. 77 FR 55212 - Notice of Commission Attendance at the Western Electricity Coordinating Council Board of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commission Attendance at the Western Electricity...: Western Electricity Coordinating Council Board of Directors Strategic Planning Session, 155 North 400...

  1. 76 FR 76704 - Western Technical College; Notice of Application Tendered for Filing With the Commission and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-08

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Western Technical College; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests Take notice that the following...

  2. Building commissioning: The key to quality assurance

    SciTech Connect

    1998-05-01

    This Guide is written to aid building owners and retrofit project managers currently participating in the Rebuild America program. The Guide provides information on implementing building commissioning projects that will optimize the results of existing building equipment improvements and retrofits projects. It should be used in coordination with Rebuild America`s Community Partnership Handbook. The Handbook describes, in detail, eight important steps necessary for planning and carrying out a community-wide energy-efficiency program. In step number 7 of the Handbook, commissioning is shown to be an integral aspect of implementing a building retrofit. The commissioning process ensures that a facility is safe, efficient, comfortable, and conducive to the presumed activities for which it was constructed. Rebuild America strongly encourages its partners to incorporate commissioning into their retrofit projects. By verifying the correct installation, functioning, operation, and maintenance of equipment, the commissioning process ensures that efficiency measures will continue to deliver benefits over the long term. Although commissioning can take place after the equipment has been installed, it is more effective when it takes place over the entire equipment installation process.

  3. 77 FR 71584 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-03

    ..., Southwest Power Pool, Inc. For more information, contact Luciano Lima, Office of Energy Markets Regulation, Federal Energy Regulatory Commission at (202) 288- 6738 or Luciano.Lima@ferc.gov . Dated: November...

  4. 77 FR 50097 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-20

    ..., Southwest Power Pool, Inc., et al. For more information, contact Luciano Lima, Office of Energy Markets ] Regulation, Federal Energy Regulatory Commission at (202) 502-6210 or luciano.lima@ferc.gov . Dated: August...

  5. 77 FR 63307 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-16

    ..., contact Luciano Lima, Office of Energy Markets Regulation, Federal Energy Regulatory Commission at (202) 502- 6210 or luciano.lima@ferc.gov . Dated: October 9, 2012. Kimberly D. Bose, Secretary. BILLING...

  6. 77 FR 42718 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-20

    .... For more information, contact Luciano Lima, Office of Energy Markets Regulation, Federal Energy Regulatory Commission at (202) 502- 6210 or luciano.lima@ferc.gov . Dated: July 12, 2012. Kimberly D....

  7. 77 FR 34034 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-08

    .... For more information, contact Luciano Lima, Office of Energy Markets Regulation, Federal Energy Regulatory Commission at (202) 502- 6210 or luciano.lima@ferc.gov . Dated: May 31, 2012. Kimberly D....

  8. 77 FR 42490 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-19

    ..., contact Luciano Lima, Office of Energy Markets Regulation, Federal Energy Regulatory Commission at (202) 502- 6210 or luciano.lima@ferc.gov . Dated: July 13, 2012. Nathaniel J. Davis, Sr., Deputy...

  9. 77 FR 75630 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-21

    ... Pool, Inc. For more information, contact Luciano Lima, Office of Energy Markets Regulation, Federal Energy Regulatory Commission at (202) 288- 6738 or Luciano.Lima@ferc.gov . Dated: December 13,...

  10. 77 FR 70160 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-23

    ... Power Pool, Inc. For more information, contact Luciano Lima, Office of Energy Markets Regulation, Federal Energy Regulatory Commission at (202) 288- 6738 or Luciano.Lima@ferc.gov . Dated: November...

  11. 77 FR 30003 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-21

    .... Docket No. ER12-1610-000, Southwest Power Pool, Inc. For more information, contact Luciano Lima, Office of Energy Markets Regulation, Federal Energy Regulatory Commission at (202) 502- 6210 or...

  12. 77 FR 35959 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-15

    .... Docket No. ER12-1610-000, Southwest Power Pool, Inc. For more information, contact Luciano Lima, Office of Energy Markets Regulation, Federal Energy Regulatory Commission at (202) 502- 6210 or...

  13. 77 FR 65680 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-30

    ... Power Pool, Inc. For more information, contact Luciano Lima, Office of Energy Markets Regulation, Federal Energy Regulatory Commission at (202) 288- 6738 or Luciano.Lima@ferc.gov . ] Dated: October...

  14. 78 FR 9688 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-11

    .... For more information, contact Luciano Lima, Office of Energy Markets Regulation, Federal Energy Regulatory Commission at (202) 288- 6738 or Luciano.Lima@ferc.gov . Dated: February 4, 2013. Kimberly D....

  15. 77 FR 38613 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-28

    .... For more information, contact Luciano Lima, Office of Energy Markets Regulation, Federal Energy Regulatory Commission at (202) 502- 6210 or luciano.lima@ferc.gov . Dated: June 21, 2012. Kimberly D....

  16. 77 FR 6556 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-08

    .... For more information, contact Luciano Lima, Office of Energy Market Regulation, Federal Energy Regulatory ] Commission at (202) 502-6210 or luciano.lima@ferc.gov . Dated: February 2, 2012. Kimberly...

  17. Nuclear Regulatory Commission information digest

    SciTech Connect

    None,

    1990-03-01

    The Nuclear Regulatory Commission information digest provides summary information regarding the US Nuclear Regulatory Commission, its regulatory responsibilities, and areas licensed by the commission. This is an annual publication for the general use of the NRC Staff and is available to the public. The digest is divided into two parts: the first presents an overview of the US Nuclear Regulatory Commission and the second provides data on NRC commercial nuclear reactor licensees and commercial nuclear power reactors worldwide.

  18. U.S. Nuclear Regulatory Commission

    MedlinePlus

    ... Reactors, gives Chris Fallon, vice president of new nuclear development at Duke Energy Florida, … more… Spotlight Strategic Plan Baffle-Former Bolts Open-Phase Electrical Issue Response to GAO Materials Licensing Audit Additional ... Plant Project Aim Commission Documents Fire Protection ...

  19. SNS Cryogenic Systems Commissioning

    SciTech Connect

    D. Hatfield; F. Casagrande; I. Campisi; P. Gurd; M. Howell; D. Stout; H. Strong; D. Arenius; J. Creel; K. Dixon; V. Ganni; and P. Knudsen

    2005-08-29

    The Spallation Neutron Source (SNS) is under construction at Oak Ridge National Laboratory. The cold section of the Linac consists of 81 superconducting radio frequency cavities cooled to 2.1K by a 2400 watt cryogenic refrigeration system. The major cryogenic system components include warm helium compressors with associated oil removal and gas management, 4.5K cold box, 7000L liquid helium dewar, 2.1K cold box (consisting of 4 stages of cold compressors), gaseous helium storage, helium purification and gas impurity monitoring system, liquid nitrogen storage and the cryogenic distribution transfer line system. The overall system commissioning and future plans will be presented.

  20. SNS Cryogenic Systems Commissioning

    SciTech Connect

    Hatfield, D.; Casagrande, F.; Campisi, I.; Gurd, P.; Howell, M.; Stout, D.; Strong, H.; Arenius, D.; Creel, J.; Dixon, K.; Ganni, V.; Knudsen, P.

    2006-04-27

    The Spallation Neutron Source (SNS) is under construction at Oak Ridge National Laboratory. The cold section of the Linac consists of 81 superconducting radio frequency cavities cooled to 2.1K by a 2400 watt cryogenic refrigeration system. The major cryogenic system components include warm helium compressors with associated oil removal and gas management, 4.5K cold box, 7000L liquid helium dewar, 2.1K cold box (consisting of 4 stages of cold compressors), gaseous helium storage, helium purification and gas impurity monitoring system, liquid nitrogen storage and the cryogenic distribution transfer line system. The overall system commissioning and future plans will be presented.

  1. 78 FR 32295 - Commission Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-29

    ... notice for such hearing, which was published in 78 FR 24785, April 26, 2013. Please note that the... From the Federal Register Online via the Government Publishing Office SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY:...

  2. 77 FR 28420 - Commission Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-14

    ... the notice for such hearing, which was published in 77 FR 23319, April 18, 2012. Authority: Pub. L. 91... From the Federal Register Online via the Government Publishing Office SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY:...

  3. Future of multistate regional commissions

    SciTech Connect

    Newman, M.

    1980-04-01

    Multistate regional commissions in the United States have been used since 1965. The largest program has been that of the Appalachian Regional Commission (ARC). Institutional and financial barriers have been the most difficult problems encountered by the ARC and other programs (such as Title V commissions). Despite the imperfect performance of the existing regional commissions, they offer a demonstration that some improvement in governmental performance can be achieved. There is virtual unanimity among the nation's governors that this is the route for Federal state relations to follow. Also, the commission route is viewed privately as the most socially acceptable means to have a beneficial impact on government performance. (SAC)

  4. Commission 10: Solar Activity

    NASA Astrophysics Data System (ADS)

    Klimchuk, James A.; van Driel-Gesztelyi, Lidia; Schrijver, Carolus J.; Melrose, Donald B.; Fletcher, Lyndsay; Gopalswamy, Natchimuthuk; Harrison, Richard A.; Mandrini, Cristina H.; Peter, Hardi; Tsuneta, Saku; Vršnak, Bojan; Wang, Jing-Xiu

    Commission 10 deals with solar activity in all of its forms, ranging from the smallest nanoflares to the largest coronal mass ejections. This report reviews scientific progress over the roughly two-year period ending in the middle of 2008. This has been an exciting time in solar physics, highlighted by the launches of the Hinode and STEREO missions late in 2006. The report is reasonably comprehensive, though it is far from exhaustive. Limited space prevents the inclusion of many significant results. The report is divided into the following sections: Photosphere and chromosphere; Transition region; Corona and coronal heating; Coronal jets; flares; Coronal mass ejection initiation; Global coronal waves and shocks; Coronal dimming; The link between low coronal CME signatures and magnetic clouds; Coronal mass ejections in the heliosphere; and Coronal mass ejections and space weather. Primary authorship is indicated at the beginning of each section.

  5. 77 FR 8095 - Technical Corrections to Commission Regulations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-14

    ...: This document corrects a document published in the Federal Register on February 1, 2012 (77 FR 4891... Energy Regulatory Commission 18 CFR Part 2 Technical Corrections to Commission Regulations Issued... are intended to be ministerial and/or informational in nature. DATES: Effective date: February...

  6. 18 CFR 1b.8 - Requests for Commission investigations.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Requests for Commission investigations. 1b.8 Section 1b.8 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION... investigations should set forth the alleged violation of law with supporting documentation and information...

  7. 18 CFR 35.27 - Authority of State commissions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Authority of State commissions. 35.27 Section 35.27 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... under applicable State and Federal law, or (b) Limits the authority of a State commission in...

  8. Commissioning a materials research laboratory

    SciTech Connect

    SAVAGE,GERALD A.

    2000-03-28

    This presentation covers the process of commissioning a new 150,000 sq. ft. research facility at Sandia National Laboratories. The laboratory being constructed is a showcase of modern design methods being built at a construction cost of less than $180 per sq. ft. This is possible in part because of the total commissioning activities that are being utilized for this project. The laboratory's unique approach to commissioning will be presented in this paper. The process will be followed through from the conceptual stage on into the actual construction portion of the laboratory. Lessons learned and cost effectiveness will be presented in a manner that will be usable for others making commissioning related decisions. Commissioning activities at every stage of the design will be presented along with the attributed benefits. Attendees will hear answers to the what, when, who, and why questions associated with commissioning of this exciting project.

  9. 76 FR 1613 - Notice of Change in Time of Commission Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-11

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Change in Time of Commission Meeting January 4, 2011. The Commission's open meeting scheduled for Thursday, January 20, 2011, will begin at 9 a.m. Kimberly D....

  10. 10 CFR 150.17 - Submission to Commission of nuclear material status reports.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Submission to Commission of nuclear material status reports. 150.17 Section 150.17 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) EXEMPTIONS AND CONTINUED... Authority in Agreement States § 150.17 Submission to Commission of nuclear material status reports....

  11. 10 CFR Appendix D to Part 20 - United States Nuclear Regulatory Commission Regional Offices

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false United States Nuclear Regulatory Commission Regional Offices D Appendix D to Part 20 Energy NUCLEAR REGULATORY COMMISSION STANDARDS FOR PROTECTION AGAINST RADIATION Pt. 20, App. D Appendix D to Part 20—United States Nuclear Regulatory Commission Regional...

  12. 10 CFR 150.17 - Submission to Commission of nuclear material status reports.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Submission to Commission of nuclear material status reports. 150.17 Section 150.17 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) EXEMPTIONS AND CONTINUED... Authority in Agreement States § 150.17 Submission to Commission of nuclear material status reports....

  13. 10 CFR 150.17 - Submission to Commission of nuclear material status reports.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Submission to Commission of nuclear material status reports. 150.17 Section 150.17 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) EXEMPTIONS AND CONTINUED... Authority in Agreement States § 150.17 Submission to Commission of nuclear material status reports....

  14. 10 CFR Appendix D to Part 20 - United States Nuclear Regulatory Commission Regional Offices

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false United States Nuclear Regulatory Commission Regional Offices D Appendix D to Part 20 Energy NUCLEAR REGULATORY COMMISSION STANDARDS FOR PROTECTION AGAINST RADIATION Pt. 20, App. D Appendix D to Part 20—United States Nuclear Regulatory Commission Regional...

  15. 10 CFR 150.17 - Submission to Commission of nuclear material status reports.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Submission to Commission of nuclear material status reports. 150.17 Section 150.17 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) EXEMPTIONS AND CONTINUED... Authority in Agreement States § 150.17 Submission to Commission of nuclear material status reports....

  16. 10 CFR 150.17 - Submission to Commission of nuclear material status reports.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Submission to Commission of nuclear material status reports. 150.17 Section 150.17 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) EXEMPTIONS AND CONTINUED... Authority in Agreement States § 150.17 Submission to Commission of nuclear material status reports....

  17. 10 CFR 150.16 - Submission to Commission of nuclear material transaction reports.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Submission to Commission of nuclear material transaction reports. 150.16 Section 150.16 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) EXEMPTIONS AND CONTINUED... Authority in Agreement States § 150.16 Submission to Commission of nuclear material transaction reports....

  18. 10 CFR 150.16 - Submission to Commission of nuclear material transaction reports.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Submission to Commission of nuclear material transaction reports. 150.16 Section 150.16 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) EXEMPTIONS AND CONTINUED... Authority in Agreement States § 150.16 Submission to Commission of nuclear material transaction reports....

  19. 10 CFR Appendix D to Part 20 - United States Nuclear Regulatory Commission Regional Offices

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false United States Nuclear Regulatory Commission Regional Offices D Appendix D to Part 20 Energy NUCLEAR REGULATORY COMMISSION STANDARDS FOR PROTECTION AGAINST RADIATION Pt. 20, App. D Appendix D to Part 20—United States Nuclear Regulatory Commission Regional...

  20. 10 CFR 150.16 - Submission to Commission of nuclear material transaction reports.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Submission to Commission of nuclear material transaction reports. 150.16 Section 150.16 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) EXEMPTIONS AND CONTINUED... Authority in Agreement States § 150.16 Submission to Commission of nuclear material transaction reports....

  1. 10 CFR Appendix D to Part 20 - United States Nuclear Regulatory Commission Regional Offices

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false United States Nuclear Regulatory Commission Regional Offices D Appendix D to Part 20 Energy NUCLEAR REGULATORY COMMISSION STANDARDS FOR PROTECTION AGAINST RADIATION Pt. 20, App. D Appendix D to Part 20—United States Nuclear Regulatory Commission Regional...

  2. 10 CFR 150.16 - Submission to Commission of nuclear material transaction reports.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Submission to Commission of nuclear material transaction reports. 150.16 Section 150.16 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) EXEMPTIONS AND CONTINUED... Authority in Agreement States § 150.16 Submission to Commission of nuclear material transaction reports....

  3. 10 CFR 150.16 - Submission to Commission of nuclear material transaction reports.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Submission to Commission of nuclear material transaction reports. 150.16 Section 150.16 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) EXEMPTIONS AND CONTINUED... Authority in Agreement States § 150.16 Submission to Commission of nuclear material transaction reports....

  4. 10 CFR Appendix D to Part 20 - United States Nuclear Regulatory Commission Regional Offices

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false United States Nuclear Regulatory Commission Regional Offices D Appendix D to Part 20 Energy NUCLEAR REGULATORY COMMISSION STANDARDS FOR PROTECTION AGAINST RADIATION Pt. 20, App. D Appendix D to Part 20—United States Nuclear Regulatory Commission Regional...

  5. 77 FR 61594 - Missouri Joint Municipal Electric Utility Commission; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-10

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Missouri Joint Municipal Electric Utility Commission; Notice of Filing Take notice that on October 1, 2012, Missouri Joint Municipal Electric Utility Commission filed its...

  6. 77 FR 47060 - Missouri Joint Municipal Electric Utility Commission; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-07

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Missouri Joint Municipal Electric Utility Commission; Notice of Filing Take notice that on July 30, 2012, Missouri Joint Municipal Electric Utility Commission filed a...

  7. 18 CFR 375.102 - Custody and authentication of Commission records.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Custody and authentication of Commission records. 375.102 Section 375.102 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REVISED GENERAL RULES THE COMMISSION...

  8. 18 CFR 375.102 - Custody and authentication of Commission records.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Custody and authentication of Commission records. 375.102 Section 375.102 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REVISED GENERAL RULES THE COMMISSION...

  9. 10 CFR 150.15a - Continued Commission authority pertaining to byproduct material.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Continued Commission authority pertaining to byproduct material. 150.15a Section 150.15a Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) EXEMPTIONS AND CONTINUED... Commission determines that such use would not endanger the public health, safety, welfare, or the...

  10. 10 CFR 150.15a - Continued Commission authority pertaining to byproduct material.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Continued Commission authority pertaining to byproduct material. 150.15a Section 150.15a Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) EXEMPTIONS AND CONTINUED... Commission determines that such use would not endanger the public health, safety, welfare, or the...

  11. 10 CFR 150.15a - Continued Commission authority pertaining to byproduct material.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Continued Commission authority pertaining to byproduct material. 150.15a Section 150.15a Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) EXEMPTIONS AND CONTINUED... Commission determines that such use would not endanger the public health, safety, welfare, or the...

  12. 10 CFR 150.15a - Continued Commission authority pertaining to byproduct material.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Continued Commission authority pertaining to byproduct material. 150.15a Section 150.15a Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) EXEMPTIONS AND CONTINUED... Commission determines that such use would not endanger the public health, safety, welfare, or the...

  13. Commissioning the polarized beam in the AGS

    SciTech Connect

    Ratner, L.G.; Brown, H.; Chiang, I.H.; Courant, E.; Gardner, C.; Lazarus, D.; Lee, Y.Y.; Makdisi, Y.; Sidhu, S.; Skelly, J.

    1985-01-01

    After the successful operation of a high energy polarized proton beam at the Argonne Laboratory Zero Gradient Synchrotron (ZGS) was terminated, plans were made to commission such a beam at the Brookhaven National Laboratory Alternating Gradient Synchrotron (AGS). On February 23, 1984, 2 ..mu..A of polarized H/sup -/ was accelerated through the Linac to 200 MeV with a polarization of about 65%. 1 ..mu..A was injected into the AGS and acceleration attempts began. Several relatively short runs were then made during the next three months. Dedicated commissioning began in early June, and on June 26 the AGS polarized beam reached 13.8 GeV/c to exceed the previous ZGS peak momentum of 12.75 GeV/c. Commissioning continued to the point where 10/sup 10/ polarized protons were accelerated to 16.5 GeV/c with 40% polarization. Then, two experiments had a short polarized proton run. We plan to continue commissioning efforts in the fall of this year to reach higher energy, higher intensity, and higher polarization levels. We present a brief description of the facility and of the methods used for preserving the polarization of the accelerating beam.

  14. Engaging student nurses in commissioning.

    PubMed

    Pierce, Jackie; Fagan, Debbie; Prescott, Brendan; Thomson, Yvonne; McCann, Stacey

    Commissioning is an important element of healthcare provision, but is often not understood or considered in depth by students. It is vital that the workforce of the future understands the machinations of service development and commissioning, so one higher education establishment decided to offer its students a placement in a clinical commissioning group. This article outlines how a university partnered with local CCGs and a regional placement network to develop the CCG clinical placement and its benefits. PMID:27295802

  15. Joint Commission on rock properties

    NASA Astrophysics Data System (ADS)

    A joint commission on Rock Properties for Petroleum Engineers (RPPE) has been established by the International Society of Rock Mechanics and the Society of Petroleum Engineers to set up data banks on the properties of sedimentary rocks encountered during drilling. Computer-based data banks of complete rock properties will be organized for sandstones (GRESA), shales (ARSHA) and carbonates (CARCA). The commission hopes to access data sources from members of the commission, private companies and the public domain.

  16. Model Commissioning Plan and Guide Specifications

    SciTech Connect

    1997-03-01

    The objectives of Model Commissioning Plan and Guide Specifications are to ensure that the design team applies commissioning concepts to the design and prepares commissioning specifications and a commission plan for inclusion in the bid construction documents.

  17. Commissioning of NSLS-II

    SciTech Connect

    Willeke, F.

    2015-05-03

    NSLS-II, the new 3rd generation light source at BNL was designed for a brightness of 1022 photons s-1mm-2mrad-2 (0.1%BW)-1. It was constructed between 2009 and 2014. The storage ring was commissioned in April 2014 which was followed by insertion device and beamline commissioning in the fall of 2014. All ambitious design parameters of the facility have already been achieved except for commissioning the full beam intensity of 500mA which requires more RF installation. This paper reports on the results of commissioning.

  18. Liberalism, authority, and bioethics commissions.

    PubMed

    MacDougall, D Robert

    2013-12-01

    Bioethicists working on national ethics commissions frequently think of themselves as advisors to the government, but distance themselves from any claims to actual authority. Governments however may find it beneficial to appear to defer to the authority of these commissions when designing laws and policies, and might appoint such commissions for exactly this reason. Where does the authority for setting laws and policies come from? This question is best answered from within a normative political philosophy. This paper explains the locus of moral authority as understood within one family of normative political theories--liberal political theories--and argues that most major "liberal" commentators have understood both the source and scope of ethics commissions' authority in a manner at odds with liberalism, rightly interpreted. The author argues that reexamining the implications of liberalism for bioethics commissions would mean changing what are considered valid criticisms of such commissions and also changing the content of national bioethics commission mandates. The author concludes that bioethicists who participate in such commissions ought to carefully examine their own views about the normative limits of governmental authority because such limits have important implications for the contribution that bioethicists can legitimately make to government commissions.

  19. National Knowledge Commission

    NASA Astrophysics Data System (ADS)

    Pitroda, Sam

    2007-04-01

    India's National Knowledge Commission (NKC) established by the prime minister is focused on building institutions and infrastructure in Education, Science and Technology, Innovation etc. to meet the challenges of the knowledge economy in the 21st century and increase India's competitive advantage in the global market. India today stands poised to reap the benefits of a rapidly growing economy and a major demographic advantage, with 550 million young people below the age of 25 years, the largest in the world. The NKC is focused on five critical areas of knowledge related to access, concepts, creation, applications and services. This includes a variety of subject areas such as language, translations, libraries, networks, portals, affirmative action, distance learning, intellectual property, Entrepreneurship, application in Agriculture, health, small and medium scale industries, e-governance etc. One of the keys to this effort is to build a national broadband gigabit of networks of 500 nodes to connect universities, Libraries, Laboratories, Hospitals, Agriculture institutions etc. to share resources and collaborate on multidisciplinary activities. This presentation will introduce the NKC, discuss methodology, subject areas, specific recommendation and outline a plan to build knowledge networks and specifics on network architecture, applications, and utilities.

  20. ALICE TPC commissioning results

    NASA Astrophysics Data System (ADS)

    Larsen, D. T.; Alice Tpc Collaboration

    2010-05-01

    ALICE is a dedicated heavy-ion experiment at CERN LHC aiming to study the properties of the quark-gluon plasma. A lead-lead collision might produce several 10 00 new particles. Detailed study of the event requires precise measurements of the particle tracks. A 90 m3 Time Projection Chamber (TPC) with more than 500 000 read-out pads was built as the main central barrel tracker. Collisions can be recorded at a rate of up to about 1 kHz. The front-end electronics, designed from FPGAs and custom ASICs, performs shaping, amplification, digitisation and digital filtering of the signals. The data are forwarded to DAQ via 216 1.25 Gb/s fibre-optical links. Configuration, control and monitoring is done by an embedded Linux system on the front-end electronics. Before production runs with beam, extensive commissioning using tracks from cosmics and from the laser system as well as clusters from radioactive krypton gas is needed. Extensive results have been obtained with respect to the performance of the TPC including its sub-systems.

  1. Ozone transport commission developments

    SciTech Connect

    Joyce, K.M.

    1995-08-01

    On September 27, 1994, the states of the Ozone Transport Commission (OTC) signed an important memorandum of understanding (MOU) agreeing to develop a regional strategy for controlling stationary sources of nitrogen oxide emissions. Specifically, the states of the Ozone Transport Region, OTR, agreed to propose regulations for the control of NOx emissions from boilers and other indirect heat exchangers with a maximum gross heat input rate of at least 250 million BTU per hour. The Ozone Transport Region was divided into Inner, Outer and Northern Zones. States in the Outer Zone agreed to reduce NOx emissions by 55%. States in the Inner Zone agreed to reduce NOx emissions 65%. Facilities in both zones have the option to emit NOx at a rate no greater than 0.2 pounds per million Btu by May 1, 1999. This option provides fairness for the gas-fired plants which already have relatively low NOx emissions. Additionally, States in the Inner and Outer Zones agreed to reduce their NOx emissions by 75% or to emit NOx at a rate no greater than 0.15 pounds per million BTU by May 1, 2003. The Northern Zone States agree to reduce their rate of NOx emissions by 55% from base year levels by May 1, 2003, or to emit NOx at a rate no greater than 0.2 pounds per million BTU. As part of this MOU, States also agreed to develop a regionwide trading mechanism to provide a cost-effective mechanism for implementing the reductions.

  2. 76 FR 7839 - Notice of Commission Staff Attendance at North American Electric Reliability Corporation (NERC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-11

    ... Commission at (202) 502-8235 or maryagnesnimis@ferc.gov or Tim Friel, Office of Electric Reliability, Federal Energy Regulatory Commission at (202) 502-6447 or tim.friel@ferc.gov . Dated: February 4, 2011....

  3. 76 FR 12090 - Commission Information Collection Activities (FERC-73); Comment Request; Extension

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-04

    ... Energy Organization Act, 42 U.S.C. 7155 and 7172, and Executive Order No. 12009, 42 FR 46277 (September.... The Commission implements these filings in 18 CFR parts 347 and 357. Action: The Commission...

  4. 75 FR 13757 - Blue Ribbon Commission on America's Nuclear Future

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-23

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Blue Ribbon Commission on America's Nuclear Future AGENCY: Department of Energy, Office of Nuclear Energy.... Department of Energy 1000 Independence Avenue, SW., Washington DC 20585, or e-mail...

  5. NIF Commissioning and Initial Performance Results

    SciTech Connect

    Van Wonterghem, B M; Burkhart, S C; Haynam, C A; Manes, K R; Marshall, C D; Murray, J E; Spaeth, M L; Speck, D R; Sutton, S B; Wegner, P J

    2003-12-19

    The National Ignition Facility at LLNL recently commissioned the first set of four beam lines into the target chamber. This effort, also called NIF Early Light, demonstrated the entire laser system architecture from master oscillator through target and initial X-ray diagnostics. This paper describes the detailed commissioning and installation steps for one of NIF's 48 beam quads. Using a dedicated single beam line Precision Diagnostic System, performance was explored over the entire power versus energy space from 6.4 TW/beam for sub-nanosecond pulses to 25 kJ/beam for 23 ns pulses at 1 {omega}. NEL also demonstrated record single beam line frequency converted Nd:Glass laser energies of 11.3 kJ at 2 {omega} and 10.4 kJ at 3{omega}.

  6. Reflections on the Gordon Commission

    ERIC Educational Resources Information Center

    Haertel, Edward

    2014-01-01

    Background:This brief reflection on the work of the Gordon Commission calls out significant themes and implications found in the various papers authored by the commissioners and other scholars, especially those included in this special issue of Teachers College Record. Purpose: The forward-looking vision of the Gordon Commission is contrasted with…

  7. Vermont Technical Education Commission Report.

    ERIC Educational Resources Information Center

    Vermont State Technical Education Commission, Montpelier.

    A 1968 New England Regional Commission grant to the Vermont Department of Administration financed a feasibility study for a technical college at the postsecondary level. The commission undertook two specific studies: an examination of ultimate career destinations of Vermont secondary students and a survey of Vermont industry to determine immediate…

  8. Illinois State Scholarship Commission Report.

    ERIC Educational Resources Information Center

    Illinois State Scholarship Commission, Deerfield.

    The Illinois State Scholarship Commission (ISSC) is responsible for the administration of 9 state authorized and funded financial aid programs for Illinois postsecondary students. The major programs consist of: (1) nonrepayable monetary awards, and (2) guaranteed educational loans. The purposes of the Commission's programs are to: (1) equalize…

  9. Investigations of the output energy deviation and other parameters during commissioning of the four-rod radio frequency quadrupole at the Fermi National Accelerator Laboratory

    SciTech Connect

    Schmidt, J. S.; et al.,

    2014-03-01

    After 30 years of operation, the Cockcroft-Walton based injector at FNAL (Fermi National Accelerator Laboratory) has been replaced by a new beam line including a dimpled magnetron 35 keV source in combination with a 750 keV 4-rod Radio Frequency Quadrupole (RFQ). The new injector is followed by the existing drift tube linac (DTL). Prior to installation, a test beam line was built which included the magnetron source and the 4-rod RFQ with a number of beam measurement instrumentation. The first beam test with the RFQ showed an output energy deviation greater than 2.5%. Other problems also showed up which led to investigations of the output energy, power consumption and transmission properties using RF simulations which were complemented with additional beam measurements. The sources of this deviation and the mechanical modifications of the RFQ to solve this matter will be presented in this paper. Meanwhile, the nominal output energy of 750 keV has been confirmed and the new injector with the 4-rod RFQ is in full operation.

  10. Investigations of the output energy deviation and other parameters during commissioning of the four-rod radio frequency quadrupole at the Fermi National Accelerator Laboratory

    NASA Astrophysics Data System (ADS)

    Schmidt, J. S.; Koubek, B.; Schempp, A.; Tan, C. Y.; Bollinger, D. S.; Duel, K. L.; Karns, P. R.; Pellico, W. A.; Scarpine, V. E.; Schupbach, B. A.; Kurennoy, S. S.

    2014-03-01

    After 30 years of operation, the Cockcroft-Walton based injector at the Fermi National Accelerator Laboratory has been replaced by a new beam line including a dimpled magnetron 35 keV source in combination with a 750 keV four-rod radio frequency quadrupole (RFQ). The new injector is followed by the existing drift tube linac. Prior to installation, a test beam line was built which included the magnetron source and the four-rod RFQ with a number of beam measurement instrumentation. The first beam test with the RFQ showed an output energy deviation greater than 2.5%. Other problems also showed up which led to investigations of the output energy, power consumption and transmission properties using rf simulations which were complemented with additional beam measurements. The sources of this deviation and the mechanical modifications of the RFQ to solve this matter will be presented in this paper. Meanwhile, the nominal output energy of 750 keV has been confirmed and the new injector with the four-rod RFQ is in full operation.

  11. Commission 31: Time

    NASA Astrophysics Data System (ADS)

    Matsakis, Demetrios; Defraigne, Pascale; Hosokawa, M.; Leschiutta, S.; Petit, G.; Zhai, Z.-C.

    2007-03-01

    The most intensely discussed and controversial issue in time keeping has been the proposal before the International Telecommunications Union (ITU) to redefine Coordinated Universal Time (UTC) so as to replace leap seconds by leap hours. Should this proposal be adopted, the practice of inserting leap seconds would cease after a specific date. Should the Earth's rotation continue to de-accelerate at its historical rate, the next discontinuity in UTC would be an hour inserted several centuries from now. Advocates of this proposal cite the need to synchronize satellite and other systems, such as GPS, Galileo, and GLONASS, which did not exist and were not envisioned when the current system was adopted. They note that leap second insertions can be and have been incorrectly implemented or accounted for. Such errors have to date had localized impact, but they could cause serious mishaps involving loss of life. For example, some GPS receivers have been known to fail simply because there was no leap second after a long enough interval, other GPS receivers failed because the leap second information was broadcast more than three months in advance, and some commercial software used for internet time-transfer Network Time Protocol (NTP) could either discard all data received after a leap second or interpret it as a frequency change. The ambiguity associated with the extra second could also disrupt financial accounting and certain forms of encryption. Those opposed to the proposal question the need for a change, and also point out the costs of adjusting to the proposed change and its inconvenience to amateur astronomers and others who rely upon astronomical calculations published in advance. Reports have been circulated that the cost of checking and correcting software to accommodate the new definition of UTC would be many millions of dollars for some systems. In October 2005 American Astronomical Society asked the ITU for a year's time to study the issue. This commission has

  12. 75 FR 43518 - Blue Ribbon Commission on America's Nuclear Future, Transportation and Storage Subcommittee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-26

    ... of Energy, Office of Nuclear Energy. ACTION: Notice of open meeting. SUMMARY: This notice announces..., DC 20585; telephone (202) 586-4243 or facsimile (202) 586- 0544; e-mail CommissionDFO@nuclear.energy... Independence Avenue, SW., Washington DC 20585, e-mail to CommissionDFO@nuclear.energy.gov , or post comments...

  13. 75 FR 61139 - Blue Ribbon Commission on America's Nuclear Future, Reactor and Fuel Cycle Technology Subcommittee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-04

    ...: Department of Energy, Office of Nuclear Energy. ACTION: Notice of Open Meeting. SUMMARY: This notice... CommissionDFO@nuclear.energy.gov . Additional information will be available at http://www.brc.gov... Avenue, SW., Washington, DC 20585; e-mail to CommissionDFO@nuclear.energy.gov , or post comments on...

  14. 76 FR 45247 - Louisiana Public Service Commission; The Council of the City of New Orleans v. Entergy...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-28

    ... Energy Regulatory Commission Louisiana Public Service Commission; The Council of the City of New Orleans v. Entergy Corporation; Notice of Filing Take notice that on July 20, 2011, Entergy Services, Inc... compliance with the Commission's June 9, 2011 Order, Louisiana Public Service Commission and the Council...

  15. 78 FR 5797 - Availability of e-Tag Information to Commission Staff; Notice Specifying webRegistry Code

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-28

    ...-Tags. \\1\\ Availability of E-Tag Information to Commission Staff, 77 FR 76367 (Dec. 28. 2012), 141 FERC ] 61,235 (2012) (FR). In Order No. 771, the Commission stated that, ``following issuance of this Final... Energy Regulatory Commission Availability of e-Tag Information to Commission Staff; Notice Specifying...

  16. 78 FR 25262 - Duke Energy Carolinas, LLC; Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-30

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Duke Energy Carolinas, LLC; Notice of Availability of Environmental... Energy Regulatory Commission's (Commission) regulations (18 CFR Part 380), Commission staff has...

  17. 16 CFR 1000.4 - Commission address.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Commission address. 1000.4 Section 1000.4 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION GENERAL COMMISSION ORGANIZATION AND FUNCTIONS § 1000.4 Commission address. The principal Offices of the Commission are at 4330 East West...

  18. 47 CFR 0.1 - The Commission.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false The Commission. 0.1 Section 0.1 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMISSION ORGANIZATION Organization General § 0.1 The Commission. The Federal Communications Commission is composed of five (5) members who are appointed by...

  19. Federal Trade Commission Semiannual Regulatory Agenda

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-26

    ... Part XX Federal Trade Commission Semiannual Regulatory Agenda ] FEDERAL TRADE COMMISSION (FTC) FEDERAL TRADE COMMISSION 16 CFR Ch. I Semiannual Regulatory Agenda AGENCY: Federal Trade Commission... published in accordance with section 22(d)(1) of the Federal Trade Commission Act, 15 U.S.C.......

  20. 11 CFR 9032.3 - Commission.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 11 Federal Elections 1 2011-01-01 2011-01-01 false Commission. 9032.3 Section 9032.3 Federal Elections FEDERAL ELECTION COMMISSION PRESIDENTIAL ELECTION CAMPAIGN FUND: PRESIDENTIAL PRIMARY MATCHING FUND DEFINITIONS § 9032.3 Commission. Commission means the Federal Election Commission, 999 E Street...

  1. 47 CFR 0.1 - The Commission.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 1 2013-10-01 2013-10-01 false The Commission. 0.1 Section 0.1 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMISSION ORGANIZATION Organization General § 0.1 The Commission. The Federal Communications Commission is composed of five (5) members who are appointed by...

  2. 47 CFR 0.1 - The Commission.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 1 2014-10-01 2014-10-01 false The Commission. 0.1 Section 0.1 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMISSION ORGANIZATION Organization General § 0.1 The Commission. The Federal Communications Commission is composed of five (5) members who are appointed by...

  3. 47 CFR 0.1 - The Commission.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 1 2011-10-01 2011-10-01 false The Commission. 0.1 Section 0.1 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMISSION ORGANIZATION Organization General § 0.1 The Commission. The Federal Communications Commission is composed of five (5) members who are appointed by...

  4. 11 CFR 9002.3 - Commission.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 11 Federal Elections 1 2010-01-01 2010-01-01 false Commission. 9002.3 Section 9002.3 Federal Elections FEDERAL ELECTION COMMISSION PRESIDENTIAL ELECTION CAMPAIGN FUND: GENERAL ELECTION FINANCING DEFINITIONS § 9002.3 Commission. Commission means the Federal Election Commission, 999 E Street,...

  5. 11 CFR 9032.3 - Commission.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 11 Federal Elections 1 2010-01-01 2010-01-01 false Commission. 9032.3 Section 9032.3 Federal Elections FEDERAL ELECTION COMMISSION PRESIDENTIAL ELECTION CAMPAIGN FUND: PRESIDENTIAL PRIMARY MATCHING FUND DEFINITIONS § 9032.3 Commission. Commission means the Federal Election Commission, 999 E Street...

  6. NSF commission holds first meeting

    NASA Astrophysics Data System (ADS)

    Jones, Richard M.

    There has been considerable discussion in Washington science policy circles over the past few weeks about the newly established National Science Board Commission on the Future of the National Science Foundation. The commission, chaired by William Danforth, chancellor of Washington University, and Robert Galvin, former chief executive officer of Motorola, held its first meeting on September 17. Unfortunately, this meeting offered few indications of what changes might result from this exercise.

  7. Wisconsin SRF Electron Gun Commissioning

    SciTech Connect

    Bisognano, Joseph J.; Bissen, M.; Bosch, R.; Efremov, M.; Eisert, D.; Fisher, M.; Green, M.; Jacobs, K.; Keil, R.; Kleman, K.; Rogers, G.; Severson, M.; Yavuz, D. D.; Legg, Robert A.; Bachimanchi, Ramakrishna; Hovater, J. Curtis; Plawski, Tomasz; Powers, Thomas J.

    2013-12-01

    The University of Wisconsin has completed fabrication and commissioning of a low frequency (199.6 MHz) superconducting electron gun based on a quarter wave resonator (QWR) cavity. Its concept was optimized to be the source for a CW free electron laser facility. The gun design includes active tuning and a high temperature superconducting solenoid. We will report on the status of the Wisconsin SRF electron gun program, including commissioning experience and first beam measurements.

  8. Status of the SPIRAL2 injector commissioning

    NASA Astrophysics Data System (ADS)

    Thuillier, T.; Angot, J.; Barué, C.; Bertrand, P.; Biarrotte, J. L.; Canet, C.; Denis, J.-F.; Ferdinand, R.; Flambard, J.-L.; Jacob, J.; Jardin, P.; Lamy, T.; Lemagnen, F.; Maunoury, L.; Osmond, B.; Peaucelle, C.; Roger, A.; Sole, P.; Touzery, R.; Tuske, O.; Uriot, D.

    2016-02-01

    The SPIRAL2 injector, installed in its tunnel, is currently under commissioning at GANIL, Caen, France. The injector is composed of two low energy beam transport lines: one is dedicated to the light ion beam production, the other to the heavy ions. The first light ion beam, created by a 2.45 GHz electron cyclotron resonance ion source, has been successfully produced in December 2014. The first beam of the PHOENIX V2 18 GHz heavy ion source was analyzed on 10 July 2015. A status of the SPIRAL2 injector commissioning is given. An upgrade of the heavy ion source, named PHOENIX V3 aimed to replace the V2, is presented. The new version features a doubled plasma chamber volume and the high charge state beam intensity is expected to increase by a factor of 1.5 to 2 up to the mass ˜50. A status of its assembly is proposed.

  9. Status of the SPIRAL2 injector commissioning.

    PubMed

    Thuillier, T; Angot, J; Barué, C; Bertrand, P; Biarrotte, J L; Canet, C; Denis, J-F; Ferdinand, R; Flambard, J-L; Jacob, J; Jardin, P; Lamy, T; Lemagnen, F; Maunoury, L; Osmond, B; Peaucelle, C; Roger, A; Sole, P; Touzery, R; Tuske, O; Uriot, D

    2016-02-01

    The SPIRAL2 injector, installed in its tunnel, is currently under commissioning at GANIL, Caen, France. The injector is composed of two low energy beam transport lines: one is dedicated to the light ion beam production, the other to the heavy ions. The first light ion beam, created by a 2.45 GHz electron cyclotron resonance ion source, has been successfully produced in December 2014. The first beam of the PHOENIX V2 18 GHz heavy ion source was analyzed on 10 July 2015. A status of the SPIRAL2 injector commissioning is given. An upgrade of the heavy ion source, named PHOENIX V3 aimed to replace the V2, is presented. The new version features a doubled plasma chamber volume and the high charge state beam intensity is expected to increase by a factor of 1.5 to 2 up to the mass ∼50. A status of its assembly is proposed.

  10. Commissioning of the PRIOR proton microscope

    DOE PAGES

    Varentsov, D.; Antonov, O.; Bakhmutova, A.; Barnes, C. W.; Bogdanov, A.; Danly, C. R.; Efimov, S.; Endres, M.; Fertman, A.; Golubev, A. A.; et al

    2016-02-18

    Recently, a new high energy proton microscopy facility PRIOR (Proton Microscope for FAIR Facility for Anti-proton and Ion Research) has been designed, constructed, and successfully commissioned at GSI Helmholtzzentrum für Schwerionenforschung (Darmstadt, Germany). As a result of the experiments with 3.5–4.5 GeV proton beams delivered by the heavy ion synchrotron SIS-18 of GSI, 30 μm spatial and 10 ns temporal resolutions of the proton microscope have been demonstrated. A new pulsed power setup for studying properties of matter under extremes has been developed for the dynamic commissioning of the PRIOR facility. This study describes the PRIOR setup as well asmore » the results of the first static and dynamic protonradiography experiments performed at GSI.« less

  11. Commissioning of the PRIOR proton microscope.

    PubMed

    Varentsov, D; Antonov, O; Bakhmutova, A; Barnes, C W; Bogdanov, A; Danly, C R; Efimov, S; Endres, M; Fertman, A; Golubev, A A; Hoffmann, D H H; Ionita, B; Kantsyrev, A; Krasik, Ya E; Lang, P M; Lomonosov, I; Mariam, F G; Markov, N; Merrill, F E; Mintsev, V B; Nikolaev, D; Panyushkin, V; Rodionova, M; Schanz, M; Schoenberg, K; Semennikov, A; Shestov, L; Skachkov, V S; Turtikov, V; Udrea, S; Vasylyev, O; Weyrich, K; Wilde, C; Zubareva, A

    2016-02-01

    Recently, a new high energy proton microscopy facility PRIOR (Proton Microscope for FAIR Facility for Anti-proton and Ion Research) has been designed, constructed, and successfully commissioned at GSI Helmholtzzentrum für Schwerionenforschung (Darmstadt, Germany). As a result of the experiments with 3.5-4.5 GeV proton beams delivered by the heavy ion synchrotron SIS-18 of GSI, 30 μm spatial and 10 ns temporal resolutions of the proton microscope have been demonstrated. A new pulsed power setup for studying properties of matter under extremes has been developed for the dynamic commissioning of the PRIOR facility. This paper describes the PRIOR setup as well as the results of the first static and dynamic proton radiography experiments performed at GSI. PMID:26931841

  12. Commissioning of the PRIOR proton microscope

    NASA Astrophysics Data System (ADS)

    Varentsov, D.; Antonov, O.; Bakhmutova, A.; Barnes, C. W.; Bogdanov, A.; Danly, C. R.; Efimov, S.; Endres, M.; Fertman, A.; Golubev, A. A.; Hoffmann, D. H. H.; Ionita, B.; Kantsyrev, A.; Krasik, Ya. E.; Lang, P. M.; Lomonosov, I.; Mariam, F. G.; Markov, N.; Merrill, F. E.; Mintsev, V. B.; Nikolaev, D.; Panyushkin, V.; Rodionova, M.; Schanz, M.; Schoenberg, K.; Semennikov, A.; Shestov, L.; Skachkov, V. S.; Turtikov, V.; Udrea, S.; Vasylyev, O.; Weyrich, K.; Wilde, C.; Zubareva, A.

    2016-02-01

    Recently, a new high energy proton microscopy facility PRIOR (Proton Microscope for FAIR Facility for Anti-proton and Ion Research) has been designed, constructed, and successfully commissioned at GSI Helmholtzzentrum für Schwerionenforschung (Darmstadt, Germany). As a result of the experiments with 3.5-4.5 GeV proton beams delivered by the heavy ion synchrotron SIS-18 of GSI, 30 μm spatial and 10 ns temporal resolutions of the proton microscope have been demonstrated. A new pulsed power setup for studying properties of matter under extremes has been developed for the dynamic commissioning of the PRIOR facility. This paper describes the PRIOR setup as well as the results of the first static and dynamic proton radiography experiments performed at GSI.

  13. 76 FR 80924 - Louisiana Public Service Commission v. Entergy Services, Inc.; Notice of Compliance Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-27

    ... Energy Regulatory Commission Louisiana Public Service Commission v. Entergy Services, Inc.; Notice of Compliance Filing Take notice that on December 19, 2011, Entergy Services, Inc., as agent on behalf of the... and is available for review in the Commission's Public Reference Room in Washington, DC. There is...

  14. 75 FR 18495 - Louisiana Public Service Commission v. Entergy Corporation, Entergy Services, Inc., Entergy...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-12

    ... Energy Regulatory Commission Louisiana Public Service Commission v. Entergy Corporation, Entergy Services..., 2010. Take notice that on March 31, 2010, the Louisiana Public Service Commission (LPS) filed a formal complaint against Entergy Corporation, Entergy Services, Inc., Entergy Louisiana, L.L.C., Entergy...

  15. 77 FR 16214 - Commission Information Collection Activities (FERC-598); Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-20

    ... Energy Regulatory Commission (Commission or FERC) is submitting the information collection FERC-598, Self... as explained below. The Commission issued a Notice in the Federal Register (77 FR 97, 1/3/2012...: Comments filed with OMB, identified by the OMB Control No. 1902-0166, should be sent via email to...

  16. 77 FR 29634 - Notice of FERC Staff Attendance at the Louisiana Public Service Commission's Business and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-18

    ... Energy Regulatory Commission Notice of FERC Staff Attendance at the Louisiana Public Service Commission's... members of its staff may attend the meeting noted below. Their attendance is part of the Commission's... Council Auditorium, 705 West University Ave., Lafayette, LA 70506. The discussions may address matters...

  17. 76 FR 4369 - Special Law Enforcement Commissions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-25

    ... Bureau of Indian Affairs Special Law Enforcement Commissions AGENCY: Bureau of Indian Affairs, Interior. ACTION: Notice. SUMMARY: This notice announces the online publication of the Interim Special Law Enforcement Commission Policy, Rules and Procedures, the Interim Special Law Enforcement Commission...

  18. GRETINA commissioning and engineering run resolution analysis

    NASA Astrophysics Data System (ADS)

    Tarlow, Thomas; Beausang, Con; Ross, Tim; Hughes, Richard; Gell, Kristen; Good, Erin

    2012-10-01

    GRETINA, the first stage in the full Gamma Ray Energy Tracking Array (GRETA), consists of seven modules covering approximately 1 solid angle. Each module is made up of four large, highly-segmented germanium detectors capable of measuring the interaction points of individual gamma-rays. GRETINA has recently been assembled and commissioned in LBNL via a series of engineering and commissioning runs. Here we report on an analysis of data from the first engineering run (ER01) which was intended to probe the response of the data acquisition system to high multiplicity gamma-ray cascades. For this experiment the 122Sn(40Ar, 4n) reaction at a beam energy of 210 MeV was utilized to populate high spin states in 158Er. A variety of beam currents, targets and trigger conditions were utilized to test the acquisition. Here we report on the measured energy resolution, both with calibration and in-beam sources as well as a gamma-gamma coincidence analysis to confirm the known level scheme and the capability of the data acquisition system for high fold coincidence measurements. This work was partly supported by the US Department of Energy via grant numbers DE-FG52-09NA29454 and DE-FG02-05-ER41379.

  19. Nuclear Regulatory Commission issuances. Volume 47, Number 3

    SciTech Connect

    1998-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The two issuances included here are: (1) the Commission issuance to the US Enrichment Corporation and (2) the Director`s Decision to the North Atlantic Energy Service Corporation.

  20. 77 FR 53883 - Benjamin Riggs v. Rhode Island Public Utility Commission; Notice of Complaint

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-04

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Benjamin Riggs v. Rhode Island Public Utility Commission; Notice of Complaint Take notice that on August 22, 2012, pursuant to Rule 206 of the Federal Energy...

  1. 75 FR 51247 - Blue Ribbon Commission on America's Nuclear Future, Disposal Subcommittee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-19

    ... Ribbon Commission on America's Nuclear Future, Disposal Subcommittee AGENCY: Department of Energy, Office of Nuclear Energy. ACTION: Notice of open meeting. SUMMARY: This notice announces an open meeting of... (202) 586- 0544; e-mail CommissionDFO@nuclear.energy.gov . Additional information will be available...

  2. 75 FR 35000 - Blue Ribbon Commission on America's Nuclear Future, Disposal Subcommittee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-21

    ... Ribbon Commission on America's Nuclear Future, Disposal Subcommittee AGENCY: Department of Energy, Office of Nuclear Energy. ACTION: Notice of Open Meeting. SUMMARY: This notice announces an open meeting of... (202) 586-4243 or facsimile (202) 586- 0544; e-mail CommissionDFO@nuclear.energy.gov ....

  3. 76 FR 70434 - Shelbyville Hydro LLC; Notice of Application Tendered for Filing With the Commission and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-14

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Shelbyville Hydro LLC; Notice of Application Tendered for Filing With the...: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington,...

  4. Commissioning Experience for the SNS Linac

    SciTech Connect

    Aleksandrov, A.; Assadi, S.; Campisi, I.; Chu, P.; Cousineau, S.; Danilov, V.; Dodson, B.G.; Galambos, J.; Jeon, D.; Henderson, S.; Holtkamp, N.; Kravchuk, L.; Kim, S.; Plum, M.; Tanke, E.; Stockli, M.

    2005-06-08

    The Spallation Neutron Source accelerator systems will deliver a 1 GeV, 1.44 MW proton beam to a liquid mercury target for neutron scattering research. The accelerator complex consists of an H- injector, capable of producing one-ms-long pulses at 60 Hz repetition rate with 38 mA peak current, a 1 GeV linear accelerator, an accumulator ring and associated transport lines. A 2.5 MeV beam from the Front End is accelerated to 86 MeV in a Drift Tube Linac, then to 185 MeV in a Coupled-Cavity Linac and then to 1 GeV in a Superconducting Linac. The staged beam commissioning of the accelerator complex is proceeding as component installation progresses. The Front End, Drift Tube Linac and part of the Coupled-Cavity Linac have been commissioned at ORNL. The primary design goals of peak current, transverse emittance and beam energy have been achieved. Results and status of the beam commissioning program will be presented.

  5. Commissioning of the CMS Forward Pixel Detector

    SciTech Connect

    Kumar, Ashish; /SUNY, Buffalo

    2008-12-01

    The Compact Muon Solenoid (CMS) experiment is scheduled for physics data taking in summer 2009 after the commissioning of high energy proton-proton collisions at Large Hadron Collider (LHC). At the core of the CMS all-silicon tracker is the silicon pixel detector, comprising three barrel layers and two pixel disks in the forward and backward regions, accounting for a total of 66 million channels. The pixel detector will provide high-resolution, 3D tracking points, essential for pattern recognition and precise vertexing, while being embedded in a hostile radiation environment. The end disks of the pixel detector, known as the Forward Pixel detector, has been assembled and tested at Fermilab, USA. It has 18 million pixel cells with dimension 100 x 150 {micro}m{sup 2}. The complete forward pixel detector was shipped to CERN in December 2007, where it underwent extensive system tests for commissioning prior to the installation. The pixel system was put in its final place inside the CMS following the installation and bake out of the LHC beam pipe in July 2008. It has been integrated with other sub-detectors in the readout since September 2008 and participated in the cosmic data taking. This report covers the strategy and results from commissioning of CMS forward pixel detector at CERN.

  6. Law sets up oceans commission

    NASA Astrophysics Data System (ADS)

    Showstack, Randy

    In an anticipated move, U.S. President Bill Clinton on August 7 signed into law the Oceans Act of 2000.The bipartisan legislation, which takes effect on January 20,2001, establishes a commission on ocean policy to examine federal ocean policy and environmental and economic trends affecting oceans and coasts.The act—which grew out of a call issued by Clinton at the National Oceans Conference in Monterey, California in 1998—requires the commission to submit recommendations to Congress and the president within 18 months of its appointment, and for the President to submit proposals to Congress about the use and stewardship of ocean and coastal resources.

  7. Division a Commission 8: Astrometry

    NASA Astrophysics Data System (ADS)

    Zacharias, Norbert; Brown, Anthony; Evans, Dafydd; Chen, Li; Gouda, Naoteru; Makarov, Valeri; Shulga, Aleksandr; Souchay, Jean; Teixeira, Rama; Unwin, Stephen

    2016-04-01

    Commission 8 has regularly published triennial reports in the past and the current OC therefore voted to adopt a traditional format also for this special Legacy issue of the IAU Transactions. The outgoing President is grateful for the support of many Commission members who contributed to this report. Our contribution consists of 3 parts: 1) this introduction, providing a general overview and highlights of recent research in astrometry, 2) a summary of the astrometry business & science meeting at the 2015 IAU General Assembly, and 3) the activity report of our Commisson covering the mid-2012 to mid-2015 period.

  8. HIRFL-CSR electron cooler commissioning

    NASA Astrophysics Data System (ADS)

    Bocharov, V.; Bubley, A.; Boimelstein, Yu.; Veremeenko, V.; Voskoboinikov, V.; Goncharov, A.; Grishanov, V.; Dranichnikov, A.; Evtushenko, Yu.; Zapiatkin, N.; Zakhvatkin, M.; Ivanov, A.; Kokoulin, V.; Kolmogorov, V.; Kondaurov, M.; Konstantinov, E.; Konstantinov, S.; Krainov, G.; Kriuchkov, A.; Kuper, E.; Medvedko, A.; Mironenko, L.; Panasiuk, V.; Parkhomchuk, V.; Petrov, S.; Reva, V.; Svischev, P.; Skarbo, B.; Smirnov, B.; Sukhina, B.; Tiunov, M.; Shirokov, V.; Shrainer, K.; Yang, X. D.; Zhao, H. W.; Wang, Z. X.; Li, J.; Zhang, J. H.; Zhang, W.; Yan, H. B.; Yan, H. H.; Xia, G. X.

    2004-10-01

    HIRFL-CSR, a new ion cooler-storage ring, is under construction at IMP. It is equipped with two electron cooling devices. The technical parameters of the project will be reviewed briefly. The HIRFL-CSR cooler could be a new generation cooler with some unique features such as a new electron gun capable to produce hollow electron beam, electrostatic bending plates and a new structure of solenoid coils at the cooling section. The commissioning of the first cooler with electron beam at IMP was completed. The second cooler with energy 300 keV is under final assembling.

  9. 18 CFR 35.27 - Authority of State commissions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Authority of State commissions. 35.27 Section 35.27 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... energy, including demand-side management, purchased at wholesale, or (2) Non-discriminatory fees for...

  10. 18 CFR 35.27 - Authority of State commissions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Authority of State commissions. 35.27 Section 35.27 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... energy, including demand-side management, purchased at wholesale, or (2) Non-discriminatory fees for...

  11. Commissioning to avoid indoor air quality problems

    SciTech Connect

    Sterling, E.M.; Collett, C.W. ); Turner, S. ); Downing, C.C. )

    1992-10-01

    This paper reports on indoor air quality (IAQ) which has become a pervasive problem plaguing the building industry worldwide. Poor IAQ in commercial and office buildings is primarily related to new building technology, new materials and equipment and energy management operating systems. Occupants of buildings with air quality problems suffer from a common series of symptoms. As early as 1982, ASHRAE, realizing the significance of the problem, produced an IAQ position statement that identified strategies for solving IAQ problems. Many of those strategies have now been implemented, including Standard 62-1989, Ventilation for Acceptable Air Quality; Standard 90.1, Energy Efficient Design of New Buildings Except Low-Rise Residential Buildings; the 100 series of energy standards; and Guideline 1, Guideline for Commissioning of HVAC Systems.

  12. 75 FR 38805 - Filing Via the Internet; Electronic Tariff Filings Notice of Display of Time on Commission's...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-06

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Filing Via the Internet; Electronic Tariff Filings Notice of Display of Time on Commission's Electronic Filing System June 28, 2010. Take notice that the Commission will...

  13. 76 FR 70713 - Carbon Zero, LLC; Notice of Application Tendered for Filing With the Commission and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-15

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Carbon Zero, LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests Take notice that the following hydroelectric application has been filed with the Commission and...

  14. 16 CFR 0.1 - The Commission.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Practices FEDERAL TRADE COMMISSION ORGANIZATION, PROCEDURES AND RULES OF PRACTICE ORGANIZATION § 0.1 The Commission. The Federal Trade Commission is an independent administrative agency which was organized in 1915 pursuant to the Federal Trade Commission Act of 1914 (38 Stat. 717, as amended; 15 U.S.C. 41-58). It...

  15. 16 CFR 0.1 - The Commission.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Practices FEDERAL TRADE COMMISSION ORGANIZATION, PROCEDURES AND RULES OF PRACTICE ORGANIZATION § 0.1 The Commission. The Federal Trade Commission is an independent administrative agency which was organized in 1915 pursuant to the Federal Trade Commission Act of 1914 (38 Stat. 717, as amended; 15 U.S.C. 41-58). It...

  16. 16 CFR 0.1 - The Commission.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Practices FEDERAL TRADE COMMISSION ORGANIZATION, PROCEDURES AND RULES OF PRACTICE ORGANIZATION § 0.1 The Commission. The Federal Trade Commission is an independent administrative agency which was organized in 1915 pursuant to the Federal Trade Commission Act of 1914 (38 Stat. 717, as amended; 15 U.S.C. 41-58). It...

  17. 16 CFR 0.1 - The Commission.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Practices FEDERAL TRADE COMMISSION ORGANIZATION, PROCEDURES AND RULES OF PRACTICE ORGANIZATION § 0.1 The Commission. The Federal Trade Commission is an independent administrative agency which was organized in 1915 pursuant to the Federal Trade Commission Act of 1914 (38 Stat. 717, as amended; 15 U.S.C. 41-58). It...

  18. 16 CFR 0.1 - The Commission.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Practices FEDERAL TRADE COMMISSION ORGANIZATION, PROCEDURES AND RULES OF PRACTICE ORGANIZATION § 0.1 The Commission. The Federal Trade Commission is an independent administrative agency which was organized in 1915 pursuant to the Federal Trade Commission Act of 1914 (38 Stat. 717, as amended; 15 U.S.C. 41-58). It...

  19. 25 CFR 700.47 - Commission.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Commission. 700.47 Section 700.47 Indians THE OFFICE OF NAVAJO AND HOPI INDIAN RELOCATION COMMISSION OPERATIONS AND RELOCATION PROCEDURES General Policies and Instructions Definitions § 700.47 Commission. The Navajo and Hopi Indian Relocation Commission is that...

  20. 25 CFR 700.47 - Commission.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 2 2011-04-01 2011-04-01 false Commission. 700.47 Section 700.47 Indians THE OFFICE OF NAVAJO AND HOPI INDIAN RELOCATION COMMISSION OPERATIONS AND RELOCATION PROCEDURES General Policies and Instructions Definitions § 700.47 Commission. The Navajo and Hopi Indian Relocation Commission is that...

  1. 25 CFR 700.47 - Commission.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 2 2012-04-01 2012-04-01 false Commission. 700.47 Section 700.47 Indians THE OFFICE OF NAVAJO AND HOPI INDIAN RELOCATION COMMISSION OPERATIONS AND RELOCATION PROCEDURES General Policies and Instructions Definitions § 700.47 Commission. The Navajo and Hopi Indian Relocation Commission is that...

  2. 25 CFR 700.47 - Commission.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 2 2013-04-01 2013-04-01 false Commission. 700.47 Section 700.47 Indians THE OFFICE OF NAVAJO AND HOPI INDIAN RELOCATION COMMISSION OPERATIONS AND RELOCATION PROCEDURES General Policies and Instructions Definitions § 700.47 Commission. The Navajo and Hopi Indian Relocation Commission is that...

  3. The Bowdoin College Experience with Commissioning.

    ERIC Educational Resources Information Center

    D'Angelo, David; Greim, Clifton W.

    1999-01-01

    Describes how Bowdoin College (Maine) lessened the volume of typical new building occupancy problems by commissioning its new facility prior to use. The school's decision to commission is discussed, the commissioning process is examined, the types of problems commissioning can find and the process used to correct them are described. (GR)

  4. 32 CFR 9.4 - Commission personnel.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 1 2011-07-01 2011-07-01 false Commission personnel. 9.4 Section 9.4 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE MILITARY COMMISSIONS PROCEDURES FOR TRIALS BY MILITARY COMMISSIONS OF CERTAIN NON-UNITED STATES CITIZENS IN THE WAR AGAINST TERRORISM § 9.4 Commission personnel. (a)...

  5. 47 CFR 1.1528 - Commission review.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 1 2012-10-01 2012-10-01 false Commission review. 1.1528 Section 1.1528... Applications § 1.1528 Commission review. Either the applicant or Bureau counsel may seek Commission review of the initial decision on the application, or the Commission may decide to review the decision on...

  6. 17 CFR 140.10 - The Commission.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 17 Commodity and Securities Exchanges 2 2014-04-01 2014-04-01 false The Commission. 140.10 Section...) ORGANIZATION, FUNCTIONS, AND PROCEDURES OF THE COMMISSION Functions § 140.10 The Commission. The Commission is composed of a Chairman and four other Commissioners, not more than three of whom may be members of the...

  7. 77 FR 31605 - Equity and Excellence Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-29

    ... Equity and Excellence Commission AGENCY: Office for Civil Rights, U.S. Department of Education. ACTION...- ] coming meeting of the Equity and Excellence Commission (Commission). The notice also describes the..., Equity and Excellence Commission, U.S. Department of Education, 400 Maryland Avenue SW., Washington,...

  8. 76 FR 41233 - Equity and Excellence Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-13

    ... Equity and Excellence Commission AGENCY: U.S. Department of Education, Office for Civil Rights. ACTION... meeting of the Equity and Excellence Commission (Commission). The notice also describes the functions of... INFORMATION CONTACT: Stephen Chen, Designated Federal Official, Equity and Excellence Commission,...

  9. 76 FR 62394 - Equity and Excellence Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-07

    ... Equity and Excellence Commission AGENCY: Office for Civil Rights, U.S. Department of Education. ACTION...-coming meeting of the Equity and Excellence Commission (Commission). The notice also describes the... Excellence Commission, ] U.S. Department of Education, 400 Maryland Avenue, SW., Washington, DC 20202....

  10. 75 FR 48661 - Equity and Excellence Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-11

    ... Equity and Excellence Commission AGENCY: U.S. Department of Education, Office for Civil Rights. ACTION: Notice of Establishment of the Equity and Excellence Commission. SUMMARY: The U.S. Secretary of Education (Secretary) announces the establishment of the Equity and Excellence Commission (Equity Commission...

  11. 77 FR 29621 - Equity and Excellence Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-18

    ... Equity and Excellence Commission AGENCY: U.S. Department of Education, Office for Civil Rights. ACTION...-coming meeting of the Equity and Excellence Commission (Commission). The notice also describes the... and Excellence Commission, U.S. Department of Education, 400 Maryland Avenue SW., Washington, DC...

  12. 77 FR 484 - Equity and Excellence Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-05

    ... Equity and Excellence Commission AGENCY: Office for Civil Rights, U.S. Department of Education. ACTION...-coming meeting of the Equity and Excellence Commission (Commission). The notice also describes the..., Equity and Excellence Commission, U.S. Department of Education, 400 Maryland Avenue SW, Washington,...

  13. 76 FR 6774 - Equity and Excellence Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-08

    ... Equity and Excellence Commission AGENCY: Office for Civil Rights, Department of Education. ACTION: Notice... meeting of the Equity and Excellence Commission (Commission). The notice also describes the functions of... Chen, Designated Federal Official, Equity and Excellence Commission, U.S. Department of Education,...

  14. 75 FR 48662 - Equity and Excellence Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-11

    ... Equity and Excellence Commission AGENCY: Office for Civil Rights, U.S. Department of Education. ACTION: Request for Nominations to Serve on the Equity and Excellence Commission. SUMMARY: The Secretary of... Equity and Excellence Commission. SUPPLEMENTARY INFORMATION: The Equity and Excellence Commission...

  15. 77 FR 49441 - Equity and Excellence Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-16

    ... Equity and Excellence Commission AGENCY: Office for Civil Rights, U.S. Department of Education. ACTION...-coming meeting of the Equity and Excellence Commission (Commission). The notice also describes the... Excellence Commission, U.S. Department of Education, 400 Maryland Avenue SW., Washington, DC 20202....

  16. Commission 12: Solar Radiation & Structure

    NASA Astrophysics Data System (ADS)

    Bogdan, Thomas. J.; Martínez Pillet, Valentin; Asplund, M.; Christensen-Dalsgaard, J.; Cauzzi, G.; Cram, L. E.; Dravins, D.; Gan, W.; Henzl, P.; Kosovichev, A.; Mariska, J. T.; Rovira, M. G.; Venkatakrishnan, P.

    2007-03-01

    Commission 12 covers research on the internal structure and dynamics of the Sun, the "quiet" solar atmosphere, solar radiation and its variability, and the nature of relatively stable magnetic structures like sunspots, faculae and the magnetic network. There is considerable productive overlap with the other Commissions of Division II as investigations move progressively toward the fertile intellectual boundaries between traditional research disciplines. In large part, the solar magnetic field provides the linkage that connects these diverse themes. The same magnetic field that produces the more subtle variations of solar structure and radiative output over the 11 yr activity cycle is also implicated in rapid and often violent phenomena such as flares, coronal mass ejections, prominence eruptions, and episodes of sporadic magnetic reconnection.The last three years have again brought significant progress in nearly all the research endeavors touched upon by the interests of Commission 12. The underlying causes for this success remain the same: sustained advances in computing capabilities coupled with diverse observations with increasing levels of spatial, temporal and spectral resolution. It is all but impossible to deal with these many advances here in anything except a cursory and selective fashion. Thankfully, the Living Reviews in Solar Physics; has published several extensive reviews over the last two years that deal explicitly with issues relevant to the purview of Commission 12. The reader who is eager for a deeper and more complete understanding of some of these advances is directed to http://www.livingreviews.org for access to these articles.

  17. 77 FR 10599 - Commission Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-22

    ..., identifies the project sponsor and facility as Water Treatment Solutions, LLC (South Mountain Lake) as being... use of lesser quality water; (2) approval for Susquehanna River Flow Management project expenditures... conducted by the Commission on February 16, 2012; notice of which was published in 77 FR 3321, January...

  18. Development and commissioning of the CARIBU project

    NASA Astrophysics Data System (ADS)

    Sun, Tao; Savard, G.; Pardo, R. C.; Baker, S.; Davids, C. N.; Levand, A.; Peterson, D.; Phillips, D. R.; Vondrasek, R.; Zabransky, B.; Zinkann, G. P.

    2010-02-01

    The Californium Rare Ion Breeder Upgrade (CARIBU) will enhance the radioactive beam capability of the ATLAS accelerator by providing high quality neutron-rich beam from a ^252Cf fission. The whole apparatus consists of four main components: 1)A Helium filled gas catcher and RFQ ion cooler that thermalizes fission products and forms a low-energy ion beam; 2)An isobar separator that magnetically purifies ion cocktails to a mass resolution of approximately 1/20000; 3)A charge breeder ECR ion source where ions of low charge states are further ionized by electron bombardment in the plasma; 4)A low energy experimental area where ions are trapped and bunched to suit high precision experiments. Ion optical simulations for CARIBU ion cooling, bunching and transmission will be presented. Experimental results from commissioning will be compared with the corresponding calculations. Other technical details of the facility and insight gained in its commissioning will also be presented. Current status of CARIBU will be given. )

  19. INITIAL COMMISSIONING OF NDCX-II

    SciTech Connect

    Lidia, S.; Arbelaez, D.; Greenway, W.; Jung, J. -Y.; Kwan, J.; Lipton, T.; Pekedis, A.; Roy, P.; Seidl, P.; Takakuwa, J.; Waldron, W.; Friedman, A.; Grote, D.; Sharp, W.; Gilson, E.

    2012-05-15

    The Neutralized Drift Compression Experiment-II (NDCX-II) will generate ion beam pulses for studies of Warm Dense Matter and heavy-ion-driven Inertial Fusion Energy. The machine will accelerate 20-50 nC of Li+ to 1.2-3 MeV energy, starting from a 10.9-cm alumino-silicate ion source. At the end of the accelerator the ions are focused to a sub-mm spot size onto a thin foil (planar) target. The pulse duration is compressed from ~;;500 ns at the source to sub-ns at the target following beam transport in a neutralizing plasma. We first describe the injector, accelerator, transport, final focus and diagnostic facilities. We then report on the results of early commissioning studies that characterize beam quality and beam transport, acceleration waveform shaping and beam current evolution. We present simulation results to benchmark against the experimental measurements.

  20. ARIEL e-LINAC: Commissioning and Development

    NASA Astrophysics Data System (ADS)

    Laxdal, R. E.; Zvyagintsev, V.

    2016-09-01

    A superconducting electron Linac (e-Linac) will be a part of the ARIEL facility for the production of radioactive ion beams (RIB) at TRIUMF. The e-Linac will consist of five 1.3GHz 9-cell cavities in three cryomodules delivering a 50MeV 10mA beam. The baseline operation will be single pass but a re-circulating ring is planned to allow either energy boost or energy recovery operation. The first stage of the accelerator which consists of two cryomodules has been successfully commissioned in 2014. The paper will discuss the superconducting radio-frequency (SRF) challenges of the accelerator. Cavities, crymodules and RF system design, preparation, and performance will be presented.

  1. 75 FR 48553 - Supplement to Commission Procedures During Periods of Emergency Operations Requiring Activation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-11

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission 18 CFR Part 376 Supplement to Commission Procedures During Periods of Emergency Operations Requiring Activation of Continuity of Operations Plan Issued August 5, 2010....

  2. 78 FR 58295 - Commission Information Collection Activities (FERC-725A); Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-23

    ... Reliability Standards for the Bulk Power System, to the Office of Management and Budget (OMB) for review of... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Commission Information Collection Activities (FERC-725A); Comment...

  3. 77 FR 31607 - Commission Information Collection Activities (FERC-587); Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-29

    ... Survey System Lands in Public Land States]) to the Office of Management and Budget (OMB) for review of... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Commission Information Collection Activities (FERC-587); Comment...

  4. 75 FR 53686 - Blue Ribbon Commission on America's Nuclear Future, Transportation and Storage Subcommittee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-01

    ... spent nuclear fuel and nuclear waste. The Co-chairs of the Commission requested the formation of the T&S... Ribbon Commission on America's Nuclear Future, Transportation and Storage Subcommittee AGENCY: Department of Energy, Office of Nuclear Energy. ACTION: Notice of open meeting. SUMMARY: This notice...

  5. 75 FR 64720 - Blue Ribbon Commission on America's Nuclear Future, Transportation and Storage Subcommittee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-20

    ... spent nuclear fuel and nuclear waste. The Co-chairs of the Commission requested the formation of the T&S... Ribbon Commission on America's Nuclear Future, Transportation and Storage Subcommittee AGENCY: Office of Nuclear Energy, Department of Energy. ACTION: Notice of Open Meeting. SUMMARY: This notice announces...

  6. 18 CFR 1b.17 - Appearance and practice before the Commission.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Appearance and practice before the Commission. 1b.17 Section 1b.17 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL RULES RULES RELATING TO INVESTIGATIONS § 1b.17...

  7. 18 CFR 1b.17 - Appearance and practice before the Commission.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Appearance and practice before the Commission. 1b.17 Section 1b.17 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL RULES RULES RELATING TO INVESTIGATIONS § 1b.17...

  8. 18 CFR 1b.17 - Appearance and practice before the Commission.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Appearance and practice before the Commission. 1b.17 Section 1b.17 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL RULES RULES RELATING TO INVESTIGATIONS § 1b.17...

  9. 18 CFR 1b.17 - Appearance and practice before the Commission.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Appearance and practice before the Commission. 1b.17 Section 1b.17 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL RULES RULES RELATING TO INVESTIGATIONS § 1b.17...

  10. 18 CFR 1b.17 - Appearance and practice before the Commission.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Appearance and practice before the Commission. 1b.17 Section 1b.17 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL RULES RULES RELATING TO INVESTIGATIONS § 1b.17...

  11. 10 CFR 110.84 - Commission action on a hearing request or intervention petition.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Commission action on a hearing request or intervention petition. 110.84 Section 110.84 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) EXPORT AND IMPORT OF NUCLEAR EQUIPMENT AND MATERIAL Public Participation Procedures Concerning License Applications §...

  12. Commissioning: perspectives from the ground.

    PubMed

    Dawda, Paresh; True, Angelene; Wells, Leanne

    2016-01-01

    Primary Health Networks (PHNs) have been tasked with two key objectives to be achieved through commissioning. Public value aims can be achieved by developing operational capability in the context of an authorising environment. Public value will need to focus on system level outcomes from multiple perspectives, including a consumer perspective. The authorising environment will require policymakers to allow time for PHNs to mature into their role. It will require an environment of effective collaboration amongst multiple stakeholders including consumers. The operational capability will need to ensure highly competent managers and clinical leadership working in a symbiotic relationship. Although some Medicare Locals demonstrated commissioning capacity and capability, this will need to be scaled up at-pace in the new healthcare landscape in order for PHNs to optimally fulfil their roles. PMID:27469048

  13. Commissioning of the LCLS LINAC

    SciTech Connect

    Loos, H.; Akre, R.; Brachmann, A.; Decker, F.-J.; Ding, Y.; Dowell, D.; Emma, P.; Frisch, J.; Gilevich, S.; Hays, G.; Hering, Ph.; Huang, Z.; Iverson, R.; Limborg-Deprey, C.; Miahnahri, A.; Molloy, S.; Nuhn, H.-D.; Turner, J.; Welch, J.; White, W.; Wu, J.; /SLAC /Stanford U., Appl. Phys. Dept.

    2010-06-11

    The Linac Coherent Light Source (LCLS) X-ray free electron laser project is currently under construction at the Stanford Linear Accelerator Center (SLAC). A new injector and upgrades to the existing accelerator were installed in two phases in 2006 and 2007. We report on the commissioning of the injector, the two new bunch compressors at 250MeV and 4.3 GeV, and transverse and longitudinal beam diagnostics up to the end of the existing linac at 13.6 GeV. The commissioning of the new transfer line from the end of the linac to the undulator is scheduled to start in November 2008 and for the undulator in March 2009 with first light to be expected in July 2009.

  14. Guidance on future art commissioning.

    PubMed

    2009-05-01

    Delegates at Building Better Healthcare's recent "National Patient Environment and the Arts Conference 2009" in London heard how national public arts think tank ixia has appointed Bristol-based arts and wellbeing development agency Willis Newson to write "concise and convincing guidance" on commissioning art for new healthcare facilities. A key message, during a joint presentation, was that integrating artwork into hospitals and other healthcare premises requires the earliest possible consideration to reap the maximum rewards.

  15. MAGNET PERFORMANCE AND RHIC COMMISSIONING.

    SciTech Connect

    HARRISON,M.

    2001-09-24

    The RHIC accelerator complex completed commissioning activities in 2000 and is presently operating for the first physics run. The complete ensemble of magnets was thus operating over an extended period for the first time. We review the magnet performance as well as relate machine performance characteristics and accelerator physics results to the various magnetic measurements made during the construction phase. The conclusions may be useful for the LHC Project.

  16. Population commission discusses international migration.

    PubMed

    1997-01-01

    At the 30th session of the Commission on Population and Development during February 24-28, 1997, international migration was the main topic, with special linkages between migration and development and on gender issues and the family. New and emerging issues were also considered. Members stressed the need for more reliable data on migration, the direction of migrants flows, and the characteristics of migrants. The Commission requested a task force on basic social services to hold a technical symposium of experts on international migration in 1998. Its chair, Dr. Nafis Sadik, said that migration issues should based on the reality of choice not on coercive measures or quotas. Almost half of the migrants globally are women. The Commission was given a new impetus by the International Conference on Population and Development held at Cairo in 1994. Migration pressures intensified in the second half of the 1980s and in the early 1990s, creating areas of concern: the negative impact of short-term migration on working conditions in host countries; migration pressures emanating from climatic change; the protection of migrant women and their children; the right of receiving countries to regulate access to their territory; the adverse consequences of forced migration; the situation of persons whose asylum claims have been rejected; the trafficking in women and children, prostitution and coercive adoption; and the sudden and massive arrival of refugees in need of international protection. The 1998 session of the Commission will feature the theme of health and mortality, with special emphasis on the linkages between health and development and on gender and age.

  17. 78 FR 44556 - Chesapeake Energy Marketing, Inc. v. Midcontinent Express Pipeline LLC; Notice of Complaint

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-24

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Chesapeake Energy Marketing, Inc. v. Midcontinent Express Pipeline LLC... Energy Regulatory Commission (Commission), 18 CFR 385.206, Chesapeake Energy Marketing, Inc. (CEMI...

  18. MINER{nu}A Test Beam Commissioning

    SciTech Connect

    Higuera, A.; Castorena, J.; Urrutia, Z.; Felix, J.; Zavala, G.

    2009-12-17

    MINER{nu}A Main INjector ExpeRiment {nu}-A is a high-statistic neutrino scattering experiment that will ran in the NuMI Beam Hall at Fermilab. To calibrate the energy response of the MINER{nu}A detector, a beamline is being designed for the MINER{nu}A Test Beam Detector (TBD). The TBD is a replica of the full MINER{nu}A detector at small scale for calibration studies of the main detector. The beamline design consists of the following parts: a copper target, used to generate tertiaries from an incoming secondary beam; a steel collimator for tertiaries, which also serves as a dump for the incoming beam; a time of fight system (scintillator planes); four wire chambers, for angle measurements and tracking; and two dipole magnets, used as an spectrometer. During last October, the first commissioning run of the MINER{nu}A Test Beam took place in the Meson Test Beam Facility at Fermilab. We commissioned the target and collimator of the new tertiary beamline.

  19. Commissioning New Construction at Emory University.

    ERIC Educational Resources Information Center

    Smith, Robin

    2001-01-01

    Discusses the process of "commissioning" for effectively maintaining and verifying new construction needs for campus facilities on a continuous improvement basis. The Emory University facility management program illustrates how to develop and manage a building commissioning process. (GR)

  20. Nuclear Regulatory Commission 1989 Information Digest

    SciTech Connect

    None,

    1989-03-01

    The Nuclear Regulatory Commission 1989 Information Digest provides summary information regarding the US Nuclear Regulatory Commission, its regulatory responsibilities, and areas licensed by the Commission. This is the first of an annual publication for the general use of the NRC staff and is available to the public. The Digest is divided into two parts: the first presents an overview of the US Nuclear Regulatory Commission and the second provides data on NRC commercial nuclear reactor licensees and commercial nuclear power reactors worldwide.

  1. Bioethics commission to review gene patenting

    SciTech Connect

    Rothenburg, L.

    1995-12-01

    In October, in an unexpected development, U.S. President Bill Clinton created a national ethics advisory board, the National Bioethics Advisory Commission (NBAC, Washington, DC), to study both research ethics and the management and use of genetic information. Of particular interest to biotechnology companies and researchers is the fact that the commission`s brief encompasses issues about human gene patenting, a subject not contained in earlier proposals for the commission.

  2. 18 CFR 367.9280 - Account 928, Regulatory commission expenses.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Account 928, Regulatory commission expenses. 367.9280 Section 367.9280 Conservation of Power and Water Resources FEDERAL ENERGY... printing, traveling expenses, and other expenses incurred directly in connection with formal cases...

  3. First beam commissioning at BNL ERL SRF Gun

    SciTech Connect

    Xu, W.; Altinbas, Z.; Belomestnykh, S.; Ben-Zvi, I.; Deonarine, S.; DeSanto, L.; Gassner, D.; Gupta, R. C.; Hahn, H.; Hammons, L.; Ho, C.; Jamilkoski, J.; Kankiya, P.; Kayran, D.; Kellerman, R.; Laloudakis, N.; Lambiase, R.; Liaw, C.; Litvinenko, V.; Mahler, G.; Masi, L.; McIntyre, G.; Miller, T.; Philips, D.; Ptitsyn, V.; Seda, T.; Sheehy, B.; Smith, K.; Rao, T.; Steszyn, A.; Tallerico, T.; Than, R.; Tuozollo, J.; Wang, E.; Weiss, D.; Wiliniski, M.; Zaltsman, A.

    2015-05-03

    The 704 MHz SRF gun successfully generated the first photoemission beam in November of 2014. The configurations of the test and the sub-systems are described.The latest results of SRF commissioning, including the cavity performance, cathode QE measurements, beam current/energy measurements, are presented in the paper.

  4. 77 FR 11520 - Commission Information Collection Activities; Comment Request; Extension

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-27

    ...In compliance with the requirements of the Paperwork Reduction Act of 1995, 44 U.S.C. 3506(c)(2)(A), the Federal Energy Regulatory Commission is soliciting public comment on the currently approved information collection, FERC-567, Gas Pipeline Certificates: Annual Reports of System Flow Diagrams and System...

  5. Power Systems Development Facility: Design, Construction, and Commissioning Status

    SciTech Connect

    Powell, C.A.; Vimalchand; Hendrix, H.L.; Honeycut, P.M.

    1996-12-31

    This paper will provide an introduction to the Power Systems Development Facility, a Department of Energy sponsored, engineering scale demonstration of two advanced coal-fired power technologies; and discuss current status of design, construction and commissioning of this facility. 28 viewgraphs, including 2 figs.

  6. 75 FR 7466 - Commission Information Collection Activities (FERC-912 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-19

    ... Notice February 3, 2010. AGENCY: Federal Energy Regulatory Commission. \\1\\ FERC-912 (``Cogeneration and... FERC) has submitted the FERC-912 \\1\\ to the Office of Management and Budget (OMB) for review of the... Docket No. IC09-912-001 requesting public comment (74 FR 63743, 12/4/ 2009), FERC and OMB received...

  7. 75 FR 43400 - Technical Corrections to Commission's Regulations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-26

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal... now has paperless electronic filing options for nearly all documents submitted to the Commission and.... Information Collection Statement 7. The Office of Management and Budget's (OMB) regulations require that...

  8. Commissioning Instrument for the GTC

    NASA Astrophysics Data System (ADS)

    Cuevas, S.; Sánchez, B.; Bringas, V.; Espejo, C.; Flores, R.; Chapa, O.; Lara, G.; Chavolla, A.; Anguiano, G.; Arciniega, S.; Dorantes, A.; González, J. L.; Montoya, J. M.; Toral, R.; Hernández, H.; Nava, R.; Devaney, N.; Castro, J.; Cavaller-Marqués, L.

    2005-12-01

    During the GTC integration phase, the Commissioning Instrument (CI) will be a diagnostic tool for performance verification. The CI features four operation modes: imaging, pupil imaging, Curvature WFS, and high resolution Shack-Hartmann WFS. This instrument was built by the Instituto de Astronomía UNAM and the Centro de Ingeniería y Desarrollo Industrial (CIDESI) under GRANTECAN contract after a public bid. In this paper we made a general instrument overview and we show some of the performance final results obtained when the Factory Acceptance tests previous to its transport to La Palma.

  9. Division J Commission 28: Galaxies

    NASA Astrophysics Data System (ADS)

    Gallagher, John S.; Davies, Roger L.; Courteau, Stéphane; Dekel, Avishai; Franx, Marijn; Jog, Chanda J.; Jogee, Sardha; Nakai, Naomasa; Rubio, Monica; Tacconi, Linda; Terlevich, Elena

    2016-04-01

    IAU Commission 28 (IAU C28: Galaxies) was founded in the late 1930s at which time it had only a small membership (see the historical notes by Sadler et al. 2007). When C28 ended its existence in 2015 there were well over 1000 members on its books. The membership had grown to the point where the effort to keep track of active participants had become a major task. During the C28s tenure 27 IAU Symposia have been devoted to galaxies, the third highest number (Mickaelian 2014)

  10. 78 FR 44927 - 101st Commission Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-25

    ... From the Federal Register Online via the Government Publishing Office ARCTIC RESEARCH COMMISSION 101st Commission Meeting Notice is hereby given that the U.S. Arctic Research Commission will hold its... presentations concerning Arctic research activities The focus of the meeting will be Arctic research...

  11. The Commission on Magnet® Recognition.

    PubMed

    Moran, Janice W

    2016-09-01

    The American Nurses Credentialing Center (ANCC) Commission on Magnet® Recognition is a voluntary governing body that oversees the Magnet Recognition Program®. Commission members are appointed by the ANCC Board of Directors and are expert representatives from various sectors of the nursing community. In addition, 1 commission member represents public consumers. PMID:27556648

  12. 75 FR 18469 - April 2010 Commission Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-12

    ...; ] EXECUTIVE OFFICE OF THE PRESIDENT National Commission on Fiscal Responsibility and Reform April 2010...), the National Commission on Fiscal Responsibility and Reform announces the following meeting: Name: National Commission on Fiscal Responsibility and Reform April 2010 Meeting. Time and Date: Tuesday,...

  13. 46 CFR 502.161 - Commission's files.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 9 2010-10-01 2010-10-01 false Commission's files. 502.161 Section 502.161 Shipping...; Presiding Officers; Evidence § 502.161 Commission's files. Where any matter contained in a tariff, report, or other document on file with the Commission is offered in evidence, such document need not...

  14. 39 CFR 3060.42 - Commission review.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 39 Postal Service 1 2014-07-01 2014-07-01 false Commission review. 3060.42 Section 3060.42 Postal... COMPETITIVE PRODUCTS ENTERPRISE § 3060.42 Commission review. (a) Interested persons shall be provided an... documentation. (b) The Commission will review the calculation of the assumed Federal income tax...

  15. 45 CFR 2101.10 - The Commission.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 4 2011-10-01 2011-10-01 false The Commission. 2101.10 Section 2101.10 Public... ORGANIZATION General Organization § 2101.10 The Commission. The Commission is composed of seven members, each of whom is appointed by the President and serves for a period of four years or until his or...

  16. 45 CFR 2101.10 - The Commission.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 4 2014-10-01 2014-10-01 false The Commission. 2101.10 Section 2101.10 Public... ORGANIZATION General Organization § 2101.10 The Commission. The Commission is composed of seven members, each of whom is appointed by the President and serves for a period of four years or until his or...

  17. 45 CFR 2101.10 - The Commission.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false The Commission. 2101.10 Section 2101.10 Public... ORGANIZATION General Organization § 2101.10 The Commission. The Commission is composed of seven members, each of whom is appointed by the President and serves for a period of four years or until his or...

  18. 16 CFR 1000.1 - The Commission.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 16 Commercial Practices 2 2014-01-01 2014-01-01 false The Commission. 1000.1 Section 1000.1....1 The Commission. (a) The Consumer Product Safety Commission is an independent regulatory agency formed on May 14, 1973, under the provisions of the Consumer Product Safety Act (Pub. L. 92-573, 86...

  19. 16 CFR 1000.1 - The Commission.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 16 Commercial Practices 2 2013-01-01 2013-01-01 false The Commission. 1000.1 Section 1000.1....1 The Commission. (a) The Consumer Product Safety Commission is an independent regulatory agency formed on May 14, 1973, under the provisions of the Consumer Product Safety Act (Pub. L. 92-573, 86...

  20. Iowa College Student Aid Commission Case Study

    ERIC Educational Resources Information Center

    Leigh, Rachel A.

    2007-01-01

    The purpose of this descriptive case study was to trace the policy production process of a state agency, the Iowa College Student Aid Commission (Commission), to its function today. This case study relied on a review of federal and state statutes, a news article search, biennium reports of the Commission, and information obtained from the…

  1. 32 CFR 9.4 - Commission personnel.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 1 2010-07-01 2010-07-01 false Commission personnel. 9.4 Section 9.4 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE MILITARY COMMISSIONS PROCEDURES FOR TRIALS BY MILITARY COMMISSIONS OF CERTAIN NON-UNITED STATES CITIZENS IN THE WAR AGAINST TERRORISM §...

  2. 39 CFR 3060.42 - Commission review.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Commission review. 3060.42 Section 3060.42 Postal Service POSTAL REGULATORY COMMISSION PERSONNEL ACCOUNTING PRACTICES AND TAX RULES FOR THE THEORETICAL COMPETITIVE PRODUCTS ENTERPRISE § 3060.42 Commission review. (a) Interested persons shall be provided...

  3. The Truman Commission's Vision of the Future

    ERIC Educational Resources Information Center

    Hutcheson, Philo A.

    2007-01-01

    Looking back over three centuries of American higher education, one can see both strengths and weaknesses in the changing attitudes toward teaching goals. In this article, the author discusses the Truman Commission's (President Harry Truman appointed the higher education commission in July 1946, and charged the commission members to examine…

  4. 76 FR 55059 - Equity and Excellence Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-06

    ... Equity and Excellence Commission AGENCY: Office for Civil Rights, U.S. Department of Education. ACTION...-coming meeting of the Equity and Excellence Commission (Commission). The notice also describes the... Auditorium. FOR FURTHER INFORMATION CONTACT: Jim Eichner, Designated Federal Official, Equity and...

  5. 77 FR 18798 - Equity and Excellence Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-28

    ... Equity and Excellence Commission AGENCY: U.S. Department of Education. ACTION: Notice; Advisory Committee... of the Equity and Excellence Commission scheduled for March 29, 2012 and announced in the Federal... Excellence Commission, U.S. Department of Education, 400 Maryland Avenue SW., Washington, DC 20202....

  6. 76 FR 27034 - Equity and Excellence Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-10

    ... Equity and Excellence Commission AGENCY: Office for Civil Rights, U.S. Department of Education. ACTION... upcoming meeting of the Equity and Excellence Commission (Commission). The notice also describes the... Auditorium. FOR FURTHER INFORMATION CONTACT: Stephen Chen, Designated Federal Official, Equity and...

  7. Beyond Commissioning: The Role of Automation

    SciTech Connect

    Brambley, Michael R.; Katipamula, Srinivas

    2005-02-01

    This article takes a brief look at the benefits of commissioning and describes a vision of the future where most of the objectives of commissioning will be accomplished automatically by capabilities built into the building systems themselves. Commissioning will become an activity that's performed continuously rather than periodically, and only repairs requiring replacement or overhaul of equipment will require manual intervention. The article then identifies some of the technologies that will be needed to realize this vision and ends with a call for all involved in the enterprise of building commissioning and automation to embrace and dedicate themselves to a future of automated commissioning.

  8. 47 CFR 51.803 - Procedures for Commission notification of a state commission's failure to act.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... the state commission and the other parties to the proceeding or matter for which preemption is sought... commission and the parties to a proceeding or matter in which the Commission has taken notice of the state... determining whether it is required to preempt the state commission's jurisdiction of a proceeding or...

  9. Commissioning and Operation of 12 GeV CEBAF

    SciTech Connect

    Freyberger, Arne P.

    2015-09-01

    The Continuous Electron Beam Accelerator Facility (CEBAF) located at the Thomas Jefferson National Accelerator Laboratory (JLab) has been recently upgraded to deliver continuous electron beams to the experimental users at a maximum energy of 12 GeV, three times the original design energy of 4 GeV. This paper will present an overview of the upgrade, referred to as the 12GeV upgrade, and highlights from recent beam commissioning results.

  10. Commission 19: Rotation of the Earth

    NASA Astrophysics Data System (ADS)

    Brzezinski, Aleksander; Ma, Chopo; Dehant, Véronique; Defraigne, Pascale; Dickey, Jean O.; Huang, Cheng-Li; Souchay, Jean; Vondrák, Jan; Charlot, Patrick; Richter, Bernd; Schuh, Harald

    The Commission supports and coordinates scientific investigations in the Earth rotation and related reference frames. Several changes had been introduced to the structure of Commission 19 since the IAU XXVI General Assembly in Prague, 2006. The Organizing Committee of Commission 19 has been substantially reduced. It consists now of six ex-officio members, the Commission president, vice-president, past president and representatives from the International Association of Geodesy (IAG), International Earth Rotation and Reference Systems Service (IERS), International VLBI Service for Geodesy and Astrometry (IVS), and five members at-large who are nominated by the OC, selected by the Commission members and elected by the IAU GA for a maximum of two terms. The modified terms of reference of Commission 19, the list of members and other details can be found at the Commission website .

  11. Commissioning neuropsychiatry services: barriers and lessons.

    PubMed

    Bhattacharya, Rahul; Rickards, Hugh; Agrawal, Niruj

    2015-12-01

    Aims and method Previous studies have shown variations in commissioning of neuropsychiatry services and this makes access to neuropsychiatric services a post-code lottery. In this survey, we approached all mental health and neuropsychiatric service commissioners within London to map current funding and commissioning arrangements, and explored perceived barriers to neuropsychiatric service commissioning. Results 83% of commissioners within London responded. There was significant variability between neuropsychiatric services commissioned through the mental health stream. Contracting arrangements were variable. Lack of earmarked fund for neuropsychiatry and disjointed funding stream for such services were identified by commissioners as a barrier, as was the critical mass of neuropsychiatric cases. Clinical implications Neuropsychiatric service development continues to be hindered by lack of clear commissioning process. Strategic drive is needed to promote more equitable neuropsychiatric services. National or regional commissioning covering a large population will provide a better model for neuropsychiatric services to be commissioned. PMID:26755989

  12. 77 FR 32622 - Lock 14 Hydro Partners; Notice of Application Tendered for Filing With the Commission and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-01

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Lock 14 Hydro Partners; Notice of Application Tendered for Filing With the... D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC...

  13. 77 FR 32624 - Lock 12 Hydro Partners; Notice of Application Tendered for Filing With the Commission and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-01

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Lock 12 Hydro Partners; Notice of Application Tendered for Filing With the... D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC...

  14. Division A Commission 31: Time

    NASA Astrophysics Data System (ADS)

    Hosokawa, Mizuhiko; Arias, Elisa Felicitas; Manchester, Richard; Tuckey, Philip; Matsakis, Demetrios; Zhang, Shougang; Zharov, Vladimir

    2016-04-01

    Time is an essential element of fundamental astronomy. In recent years there have been many time-related issues, in scientific and technological aspects as well as in conventions and definitions. At the Commission 31 (Time) business meeting at the XXIX General Assembly, recent progress and many topics, including Pulsar Time Scales WG and Future UTC WG activities, were reviewed and discussed. In this report, we will review the progress of these topics in the past three years. There are many remarkable topics, such as Time scales, Atomic clock development, Time transfer, Future UTC and future redefinition of the second. Among them, scientific highlights are the progress of pulsar time scales and the optical frequency standards. On the other hand, as the social convention, change in the definition of UTC and the second is important.

  15. Automated Demand Response and Commissioning

    SciTech Connect

    Piette, Mary Ann; Watson, David S.; Motegi, Naoya; Bourassa, Norman

    2005-04-01

    This paper describes the results from the second season of research to develop and evaluate the performance of new Automated Demand Response (Auto-DR) hardware and software technology in large facilities. Demand Response (DR) is a set of activities to reduce or shift electricity use to improve the electric grid reliability and manage electricity costs. Fully-Automated Demand Response does not involve human intervention, but is initiated at a home, building, or facility through receipt of an external communications signal. We refer to this as Auto-DR. The evaluation of the control and communications must be properly configured and pass through a set of test stages: Readiness, Approval, Price Client/Price Server Communication, Internet Gateway/Internet Relay Communication, Control of Equipment, and DR Shed Effectiveness. New commissioning tests are needed for such systems to improve connecting demand responsive building systems to the electric grid demand response systems.

  16. 75 FR 22588 - Grassland Renewables Energy LLC; Notice of Petition for Declaratory Order

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-29

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Grassland Renewables Energy LLC; Notice of Petition for Declaratory Order... Regulatory Commission's (Commission) Rules of Practice and Procedure, Grassland Renewables Energy LLC...

  17. 75 FR 18202 - Grassland Renewables Energy LLC; Notice of Petition for Declaratory Order

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-09

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Grassland Renewables Energy LLC; Notice of Petition for Declaratory Order... Regulatory Commission's (Commission) Rules of Practice and Procedure, Grassland Renewables Energy LLC...

  18. 76 FR 4888 - Commission Information Collection Activities (FERC-537); Comment Request; Submitted for OMB Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-27

    ...In compliance with the requirements of section 3507 of the Paperwork Reduction Act of 1995, 44 U.S.C. 3507, the Federal Energy Regulatory Commission (Commission or FERC) has submitted the information collection described below to the Office of Management and Budget (OMB) for review of the information collection requirements. Any interested person may file comments directly with OMB and should......

  19. 78 FR 2984 - Antrim County; Notice of Application Tendered for Filing With the Commission, Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-15

    ... Energy Regulatory Commission Antrim County; Notice of Application Tendered for Filing With the Commission.... Project No.: P-3030-019. c. Date filed: December 21, 2012. d. Applicant: Antrim County. e. Name of Project: Elk Rapids Hydroelectric Project f. Location: On the Elk River in the village of Elk Rapids in...

  20. 76 FR 34216 - Commission Information Collection Activities (Ferc-521), Proposed Collection; Comment Request...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-13

    ..., ``Payments for Benefits from Headwater Benefits'' (OMB No. 1902-0087), is used by the Commission to implement... authorizes the Commission to determine headwater benefits received by downstream hydropower project owners. Headwater benefits is the additional energy production possible at a downstream hydropower project...

  1. Advanced photoinjector experiment photogun commissioning results

    NASA Astrophysics Data System (ADS)

    Sannibale, F.; Filippetto, D.; Papadopoulos, C. F.; Staples, J.; Wells, R.; Bailey, B.; Baptiste, K.; Corlett, J.; Cork, C.; De Santis, S.; Dimaggio, S.; Doolittle, L.; Doyle, J.; Feng, J.; Garcia Quintas, D.; Huang, G.; Huang, H.; Kramasz, T.; Kwiatkowski, S.; Lellinger, R.; Moroz, V.; Norum, W. E.; Padmore, H.; Pappas, C.; Portmann, G.; Vecchione, T.; Vinco, M.; Zolotorev, M.; Zucca, F.

    2012-10-01

    The Advanced Photoinjector Experiment (APEX) at the Lawrence Berkeley National Laboratory is dedicated to the development of a high-brightness high-repetition rate (MHz-class) electron injector for x-ray free-electron laser (FEL) and other applications where high repetition rates and high brightness are simultaneously required. The injector is based on a new concept rf gun utilizing a normal-conducting (NC) cavity resonating in the VHF band at 186 MHz, and operating in continuous wave (cw) mode in conjunction with high quantum efficiency photocathodes capable of delivering the required charge at MHz repetition rates with available laser technology. The APEX activities are staged in three phases. In phase 0, the NC cw gun is built and tested to demonstrate the major milestones to validate the gun design and performance. Also, starting in phase 0 and continuing in phase I, different photocathodes are tested at the gun energy and at full repetition rate for validating candidate materials to operate in a high-repetition rate FEL. In phase II, a room-temperature pulsed linac is added for accelerating the beam at several tens of MeV to reduce space charge effects and allow the measurement of the brightness of the beam from the gun when integrated in an injector scheme. The installation of the phase 0 beam line and the commissioning of the VHF gun are completed, phase I components are under fabrication, and initial design and specification of components and layout for phase II are under way. This paper presents the phase 0 commissioning results with emphasis on the experimental milestones that have successfully demonstrated the APEX gun capability of operating at the required performance.

  2. Large Hadron Collider commissioning and first operation.

    PubMed

    Myers, S

    2012-02-28

    A history of the commissioning and the very successful early operation of the Large Hadron Collider (LHC) is described. The accident that interrupted the first commissioning, its repair and the enhanced protection system put in place are fully described. The LHC beam commissioning and operational performance are reviewed for the period from 2010 to mid-2011. Preliminary plans for operation and future upgrades for the LHC are given for the short and medium term.

  3. Commissioning Results on the JWST Testbed Telescope

    NASA Technical Reports Server (NTRS)

    Dean, Bruce H.; Acton, D. Scott

    2006-01-01

    The one-meter 18 segment JWST Testbed Telescope (TBT) has been developed at Ball Aerospace to facilitate commissioning operations for the JWST Observatory. Eight different commissioning activities were tested on the TBT: telescope focus sweep, segment ID and Search, image array, global alignment, image stacking, coarse phasing, fine phasing, and multi-field phasing. This paper describes recent commissioning results from experiments performed on the TBT.

  4. Commission 26: Double and Multiple Stars

    NASA Astrophysics Data System (ADS)

    Hartkopf, William I.; Allen, Christine; Davis, J. A.; Fekel, F. C.; Lampens, P.; Ling, J. F.; Oblak, E.; Oswalt, T. D.; Scarfe, C.

    2007-03-01

    While Commission 26 remains one of the smallest in the IAU, it maintains an active program which belies its size, as highlighted below. Further information on the commission may be found at our website: http://ad.usno.navy.mil/wds/dsl.html#iau. This site includes links to other sites and to major databases and catalogues, as well as bibliographies of recent double star papers, an archive of the Commission's Information Circulars, and a list of upcoming meetings.

  5. HYTEST Phase I Facility Commissioning and Modeling

    SciTech Connect

    Lee P. Shunn; Richard D. Boardman; Shane J. Cherry; Craig G. Rieger

    2009-09-01

    The purpose of this document is to report the first year accomplishments of two coordinated Laboratory Directed Research and Development (LDRD) projects that utilize a hybrid energy testing laboratory that couples various reactors to investigate system reactance behavior. This work is the first phase of a series of hybrid energy research and testing stations - referred to hereafter as HYTEST facilities – that are planned for construction and operation at the Idaho National Laboratory (INL). A HYTEST Phase I facility was set up and commissioned in Bay 9 of the Bonneville County Technology Center (BCTC). The purpose of this facility is to utilize the hydrogen and oxygen that is produced by the High Temperature Steam Electrolysis test reactors operating in Bay 9 to support the investigation of kinetic phenomena and transient response of integrated reactor components. This facility provides a convenient scale for conducting scoping tests of new reaction concepts, materials performance, new instruments, and real-time data collection and manipulation for advance process controls. An enclosed reactor module was assembled and connected to a new ventilation system equipped with a variable-speed exhaust blower to mitigate hazardous gas exposures, as well as contract with hot surfaces. The module was equipped with a hydrogen gas pump and receiver tank to supply high quality hydrogen to chemical reactors located in the hood.

  6. 78 FR 44165 - Nuclear Regulatory Commission Enforcement Policy

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-23

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Nuclear Regulatory Commission Enforcement Policy AGENCY: Nuclear Regulatory Commission. ACTION: Enforcement policy; request for comment. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is...

  7. SNS BEAM COMMISSIONING TOOLS AND EXPERIENCE

    SciTech Connect

    Shishlo, Andrei P; Galambos, John D

    2008-01-01

    The Spallation Neutron Source (SNS) successfully met the primary construction project completion milestones in April 2006. An important ingredient of this successful commissioning was the development and use of software tools. With the increasing digitalization of beam diagnostics and increasing complexity of Integrated Control Systems of large accelerators, the need for high level software tools is critical for smooth commissioning. At SNS a special Java based infrastructure called XAL was prepared for beam commissioning. XAL provides a hierarchal view of the accelerator, is data base configured, and includes a physics model of the beam. This infrastructure and individual applications development along with a historical time line of the SNS commissioning will be discussed.

  8. 75 FR 35001 - Blue Ribbon Commission on America's Nuclear Future, Reactor and Fuel Cycle Technologies Subcommittee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-21

    ...: Department of Energy, Office of Nuclear Energy. ACTION: Notice of Open Meeting. SUMMARY: This notice... CommissionDFO@nuclear.energy.gov . Additional information may also be available at http://www.brc.gov... a.m. on July 12 with the presentations regarding the Department of Energy's Office of Nuclear...

  9. 11 CFR 7.17 - Use of Commission employment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 11 Federal Elections 1 2010-01-01 2010-01-01 false Use of Commission employment. 7.17 Section 7.17 Federal Elections FEDERAL ELECTION COMMISSION STANDARDS OF CONDUCT Conduct and Responsibilities of Special Commission Employees § 7.17 Use of Commission employment. A special Commission employee shall not use his or her Commission employment for...

  10. HADRON ACCELERATORS: HIRFL-CSR commissioning in 2006 and 2007

    NASA Astrophysics Data System (ADS)

    Xia, Jia-Wen; Yuan, You-Jin; Liu, Yong; Yang, Jian-Cheng; Xu, Hu-Shan; Xiao, Guo-Qing; Yang, Xiao-Dong; Zhang, Wei; Gao, Da-Qing; Zhou, Zhong-Zu; Mao, Rui-Shi; Mao, Li-Jun; He, Yuan; Xu, Zhe; Yang, Ya-Qing; Xiao, Chen; Yin, Da-Yu; Zhao, Tie-Cheng; Wu, Jun-Xia; Li, Guo-Hong; Li, Jie; Li, Peng; Li, Ke; Hu, Zheng-Guo

    2009-06-01

    HIRFL-CSR, a new heavy ion cooler-storage-ring system at IMP, had been in commissioning since the beginning of 2006. In the two years of 2006 and 2007 the CSR commissioning was finished, including the stripping injection (STI), electron-cooling with hollow electron beam, C-beam stacking with the combination of STI and e-cooling, the wide energy-range synchrotron ramping from 7 MeV/u to 1000 MeV/u by changing the RF harmonic-number at mid-energy, the multiple multi-turn injection (MMI), the beam accumulation with MMI and e-cooling for heavy-ion beams of Ar, Kr and Xe, the fast extraction from CSRm and single-turn injection to CSRe, beam stacking in CSRe and the RIBs mass-spectrometer test with the isochronous mode in CSRe by using the time-of-flight method.

  11. Residential commissioning to assess envelope and HVAC system performance

    SciTech Connect

    Wray, Craig P.; Sherman, Max H.

    2001-08-31

    Houses do not perform optimally or even as many codes and forecasts predict. For example, Walker et al. (1998a) found large variations in thermal distribution system efficiency, as much as a factor of two even between side-by-side houses with the same system design and installation crew. This and other studies (e.g., Jump et al. 1996) indicate that duct leakage testing and sealing can readily achieve a 25 to 30% reduction in installed cooling capacity and energy consumption. As another example, consider that the building industry has recognized for at least 20 years the substantial impact that envelope airtightness has on thermal loads, energy use, comfort, and indoor air quality. However, Walker et al. (1998a) found 50% variances in airtightness for houses with the same design and construction crews, within the same subdivision. A substantial reason for these problems is that few houses are now built or retrofitted using formal design procedures, most are field assembled from a large number of components, and there is no consistent process to identify problems or to correct them. Solving the problems requires field performance evaluations of houses using appropriate and agreed upon procedures. Many procedural elements already exist in a fragmented environment; some are ready now to be integrated into a new process called residential commissioning (Wray et al. 2000). For example, California's Title 24 energy code already provides some commissioning elements for evaluating the energy performance of new houses. A house consists of components and systems that need to be commissioned, such as building envelopes, air distribution systems, cooling equipment, heat pumps, combustion appliances, controls, and other electrical appliances. For simplicity and practicality, these components and systems are usually evaluated individually, but we need to bear in mind that many of them interact. Therefore, commissioning must not only identify the energy and non-energy benefits

  12. 29 CFR 1603.304 - Commission decision.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... EXEMPT STATE AND LOCAL GOVERNMENT EMPLOYEE COMPLAINTS OF EMPLOYMENT DISCRIMINATION UNDER SECTION 304 OF... consideration by the Commission. (b) When an administrative law judge certifies a matter for interlocutory review under § 1603.213, the Commission may, in its discretion, issue a decision on the matter or...

  13. 76 FR 63325 - National Indian Gaming Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-12

    ...). II. Definitions--Net Revenues--management fee The NOI asked whether the Commission should consider whether the definition of net revenues for the purposes of calculating the management fees should be... Register on November 18, 2010. 75 FR 70680. The Commission's regulatory review process established a...

  14. Commissioning MMS: Challenges and Lessons Learned

    NASA Technical Reports Server (NTRS)

    Wood, Paul; Gramling, Cheryl; Reiter, Jennifer; Smith, Patrick; Stone, John

    2016-01-01

    This paper discusses commissioning of NASA's Magnetospheric MultiScale (MMS) Mission. The mission includes four identical spacecraft with a large, complex set of instrumentation. The planning for and execution of commissioning for this mission is described. The paper concludes by discussing lessons learned.

  15. Women Appointed to State Boards and Commissions.

    ERIC Educational Resources Information Center

    Rutgers, The State Univ., New Brunswick, NJ. Center for the American Woman and Politics.

    The report analyzed the average proportions of women on 2,134 state boards and commissions in ten areas of state government. Data were collected in 1975 at the request of the Women in Power Committee of the National Commission on the Observance of International Women's Year. The ten functional areas of government were business regulation, economic…

  16. Commission on Preservation and Access Newsletter, 1996.

    ERIC Educational Resources Information Center

    Commission on Preservation and Access Newsletter, 1996

    1996-01-01

    The Commission on Preservation and Access was established to foster and support collaboration among libraries and allied organizations in order to ensure the preservation of the published and documentary record in all formats and to provide enhanced access to scholarly information. The Commission's newsletter keeps preservation and access…

  17. Appalachian Regional Commission Annual Report, 2001.

    ERIC Educational Resources Information Center

    Appalachian Regional Commission, Washington, DC.

    In fiscal year 2001, the Appalachian Regional Commission invested $63.6 million in 469 economic and human development (nonhighway) projects and $389.6 million in highway projects in Appalachia. The Commission launched a new initiative to promote the development of telecommunications infrastructure, especially in distressed counties. The Commission…

  18. 77 FR 48429 - Commission Address Change

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-14

    ... HEALTH REVIEW COMMISSION 29 CFR Parts 2700, 2701, 2702, 2704, 2705, 2706 Commission Address Change AGENCY... to inform the public of the address change. DATES: This final rule will take effect on August 27... because the amendments are of a minor and administrative nature dealing with only a change in address....

  19. A Custom Fit with a Commissioned Song.

    ERIC Educational Resources Information Center

    Strempel, Eileen

    1999-01-01

    Discusses the benefits of commissioning a work for a choral group. Provides guidelines for music educators who commission a piece: (1) know your own needs; (2) find a composer who interests you; (3) help the composer select appropriate lyrics; (4) set a tentative schedule; (5) consider the costs. (CMK)

  20. 18 CFR 35.31 - Commission review.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... the ASC methodology set forth at 18 CFR 301.1. If the ASC is not in accord with the methodology, the... Commission under this subpart is computed in accordance with 18 CFR 35.19a. Interest on any increase ordered... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Commission review....

  1. 17 CFR 201.57 - Commission review.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Regulations Pertaining to the Equal Access to Justice Act § 201.57 Commission review. In accordance with the procedures set forth in 17 CFR 201.410 and 201.411, either the applicant or counsel for the Office or... 17 Commodity and Securities Exchanges 2 2010-04-01 2010-04-01 false Commission review....

  2. Commission 25: Stellar Photometry and Polarimetry

    NASA Astrophysics Data System (ADS)

    Martinez, Peter; Milone, Eugene; Landolt, Arlo; Jordi, Carme; Mironov, Aleksey; Shenbang, Qian; Schmidt, Edward; Sterken, Christiaan

    2010-05-01

    The Business Meeting for Commission 25 was held on the 6th of August 2009. The meeting was chaired by Dr Eugene Milone, Vice President for the 2006-2009 triennium, and incoming President for the 2009-2011 triennium. Dr Milone presented an apology from the President of the Commission, Dr Peter Martinez, who was unable to attend the meeting.

  3. Report of the Commission on University Purpose.

    ERIC Educational Resources Information Center

    Alberta Univ., Edmonton. The Senate.

    A report of the Commission on University Purpose of The University of Alberta, Canada, is presented. Based on the perceptions of the various publics, the Commission sought to clarify the purposes and functions of the university. After an introductory section on the historical development of universities and The University of Alberta, changing…

  4. 77 FR 39560 - International Joint Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-03

    ... International Joint Commission International Joint Commission Invites Public Comment on Upper Great Lakes Report... final report of its International Upper Great Lakes Study Board, Lake Superior Regulation: Addressing Uncertainty in Upper Great Lakes Water Levels. Comments will be accepted at public hearings and by mail,...

  5. 77 FR 2711 - Equity and Excellence Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-19

    ... Register (FR Doc. 2011-33800 Filed 1-4-12; 8:45 a.m.) a notice of open meeting on January 23, 2012 for the Equity and Excellence Commission. This notice amends the January 5, 2012 notice by providing notice of a... Equity and Excellence Commission AGENCY: Office for Civil Rights, Education. ACTION: Notice of...

  6. Commission 12: Solar Radiation and Structure

    NASA Astrophysics Data System (ADS)

    Kosovichev, Alexander; Cauzzi, Gianna; Pillet, Valentin Martinez; Asplund, Martin; Brandenburg, Axel; Chou, Dean-Yi; Christensen-Dalsgaard, Jorgen; Gan, Weiqun; Kuznetsov, Vladimir D.; Rovira, Marta G.; Shchukina, Nataliya; Venkatakrishnan, P.

    2012-04-01

    Commission 12 of the International Astronomical Union encompasses investigations of the internal structure and dynamics of the Sun, mostly accessible through the techniques of local and global helioseismology, the quiet solar atmosphere, solar radiation and its variability, and the nature of relatively stable magnetic structures like sunspots, faculae and the magnetic network. The Commission sees participation of over 350 scientists worldwide.

  7. Nuclear Regulatory Commission issuances, January 1997. Volume 45, Number 1

    SciTech Connect

    1997-01-01

    This book contains issuances of the Atomic Safety and Licensing Board, Nuclear Regulatory Commission and Director`s Decision for January 1997. The issuances concern Sequoyah Fuels Corporation and General Atomics Gore, Oklahoma Site decontamination and decommissioning funding; Louisiana Energy Services, Claiborne Enrichment Center denies appeal to review emergency planning; General Public Utilities Nuclear Corporation, Oyster Creek Nuclear Generating station, challenges to technical specifications concerning spent fuel pool; and Consumers Power Company, Palisades Nuclear Plant dry cask storage of spent nuclear fuel.

  8. Nuclear Regulatory Commission Issuances. Volume 45, No. 3

    SciTech Connect

    1997-03-01

    This report includes the issuances received in March 1997. Issuances are from the Commission, the Atomic Safety and Licensing Boards, and the Directors` Decisions. 10 issuances were received: Louisiana Energy Services (2 issuances); Illinois Power Company and Soyland Power Cooperative; Ralph. L. Tetrick; University of Cincinnati; Consumers Power Company; Entergy Operations, Inc.; Georgia Power Company; Westinghouse Electric Corporation; and Wisconsin Electric Power Company. No issuances were received from the the Administrative Law Judges or the Decisions on Petitions for Rulemaking.

  9. A Practical Guide for Commissioning Existing Buildings

    SciTech Connect

    Haasl, T.

    1999-05-11

    Although this guide focuses on the retrocommissioning process and its advantages, all three types of commissioning--retrocommissioning, commissioning, and recommissioning--play an equally important role in ensuring that buildings perform efficiently and provide comfortable, safe, and productive work environments for owners and occupants. For new construction and retrofit projects, commissioning should be incorporated early, during design, and last throughout the length of the project. For buildings that were never commissioned, the retrocommissioning process can yield a wealth of cost-saving opportunities while enhancing a building's environment. Finally, once a building is commissioned or retrocommissioned, incorporating recommissioning into the organization's O and M program (by periodically reapplying the original diagnostic testing and checklist procedures) helps ensure that cost savings and other benefits gained from the original process persist over time.

  10. A Practical Guide for Commissioning Existing Buildings

    SciTech Connect

    Haasl, T.; Sharp, T.

    1999-04-01

    Although this guide focuses on the retrocommissioning process and its advantages, all three types of commissioning--retrocommissioning, commissioning, and recommissioning--play an equally important role in ensuring that buildings perform efficiently and provide comfortable, safe, and productive work environments for owners and occupants. For new construction and retrofit projects, commissioning should be incorporated early, during design, and last throughout the length of the project. For buildings that were never commissioned, the retrocommissioning process can yield a wealth of cost-saving opportunities while enhancing a building's environment. Finally, once a building is commissioned or retrocommissioned, incorporating recommissioning into the organization's O and M program (by periodically reapplying the original diagnostic testing and checklist procedures) helps ensure that cost savings and other benefits gained from the original process persist over time.

  11. 78 FR 45068 - Commission's Rules of Practice and Procedure; Practice Before the Commission, Parties to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-26

    ... amendments to Subparts E and L, effective November 12, 2012. See 76 FR 10258, Feb. 24, 2011 and 77 FR 61519... Commission, Parties to Proceedings, and Rulemakings AGENCY: Federal Maritime Commission. ACTION: Final rule... regarding practice before the Commission, parties to proceedings, and rulemakings, to update, clarify,...

  12. 33 CFR 209.50 - Mississippi River Commission: Public observation of Commission meetings.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Mississippi River Commission... ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE ADMINISTRATIVE PROCEDURE § 209.50 Mississippi River... of the Mississippi River Commission and to open all meetings of the Mississippi River Commission...

  13. 33 CFR 209.50 - Mississippi River Commission: Public observation of Commission meetings.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... criminal investigation or by an agency conducting a lawful national-security intelligence investigation... Commission. (2) President means the duly appointed President and Executive Officer of the Commission. (3... Commission. (5) Chief Legal Officer means the Division Counsel or the acting Division Counsel of the...

  14. 33 CFR 209.50 - Mississippi River Commission: Public observation of Commission meetings.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... criminal investigation or by an agency conducting a lawful national-security intelligence investigation... Commission. (2) President means the duly appointed President and Executive Officer of the Commission. (3... Commission. (5) Chief Legal Officer means the Division Counsel or the acting Division Counsel of the...

  15. 33 CFR 209.50 - Mississippi River Commission: Public observation of Commission meetings.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... criminal investigation or by an agency conducting a lawful national-security intelligence investigation... Commission. (2) President means the duly appointed President and Executive Officer of the Commission. (3... Commission. (5) Chief Legal Officer means the Division Counsel or the acting Division Counsel of the...

  16. 47 CFR 51.803 - Procedures for Commission notification of a state commission's failure to act.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 3 2010-10-01 2010-10-01 false Procedures for Commission notification of a state commission's failure to act. 51.803 Section 51.803 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES (CONTINUED) INTERCONNECTION Procedures for Implementation...

  17. 76 FR 68745 - DC Energy, LLC; DC Energy Mid-Atlantic, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-07

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission DC Energy, LLC; DC Energy Mid-Atlantic, LLC v. PJM Interconnection, L.L.C... Federal Energy Regulatory Commission (Commission), 18 CFR 385.206 (2011), DC Energy, LLC (DC Energy)...

  18. 76 FR 78631 - Appalachian Power Company; Notice of Designation of Certain Commission Personnel as Non-Decisional

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-19

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Appalachian Power Company; Notice of Designation of Certain Commission... agreement for the Smith Mountain 2011 updated Shoreline Management Plan. As ``non-decisional'' staff,...

  19. 10 CFR Appendix A to Part 5 - List of Federal Financial Assistance Administered by the Nuclear Regulatory Commission to Which...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false List of Federal Financial Assistance Administered by the Nuclear Regulatory Commission to Which Title IX Applies A Appendix A to Part 5 Energy NUCLEAR REGULATORY COMMISSION NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Pt. 5, App. A...

  20. 18 CFR 33.11 - Commission procedures for the consideration of applications under section 203 of the FPA.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Commission procedures... of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT APPLICATIONS UNDER FEDERAL POWER ACT SECTION 203 § 33.11...

  1. 10 CFR Appendix A to Part 73 - U.S. Nuclear Regulatory Commission Offices and Classified Mailing Addresses

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false U.S. Nuclear Regulatory Commission Offices and Classified Mailing Addresses A Appendix A to Part 73 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) PHYSICAL PROTECTION OF PLANTS AND MATERIALS Pt. 73, App. A Appendix A to Part 73—U.S. Nuclear Regulatory...

  2. 10 CFR Appendix A to Part 73 - U.S. Nuclear Regulatory Commission Offices and Classified Mailing Addresses

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false U.S. Nuclear Regulatory Commission Offices and Classified Mailing Addresses A Appendix A to Part 73 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) PHYSICAL PROTECTION OF PLANTS AND MATERIALS Pt. 73, App. A Appendix A to Part 73—U.S. Nuclear Regulatory...

  3. 10 CFR Appendix A to Part 73 - U.S. Nuclear Regulatory Commission Offices and Classified Mailing Addresses

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false U.S. Nuclear Regulatory Commission Offices and Classified Mailing Addresses A Appendix A to Part 73 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) PHYSICAL PROTECTION OF PLANTS AND MATERIALS Pt. 73, App. A Appendix A to Part 73—U.S. Nuclear Regulatory...

  4. 10 CFR Appendix A to Part 73 - U.S. Nuclear Regulatory Commission Offices and Classified Mailing Addresses

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false U.S. Nuclear Regulatory Commission Offices and Classified Mailing Addresses A Appendix A to Part 73 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) PHYSICAL PROTECTION OF PLANTS AND MATERIALS Pt. 73, App. A Appendix A to Part 73—U.S. Nuclear Regulatory...

  5. 10 CFR Appendix A to Part 73 - U.S. Nuclear Regulatory Commission Offices and Classified Mailing Addresses

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false U.S. Nuclear Regulatory Commission Offices and Classified Mailing Addresses A Appendix A to Part 73 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) PHYSICAL PROTECTION OF PLANTS AND MATERIALS Pt. 73, App. A Appendix A to Part 73—U.S. Nuclear Regulatory...

  6. 78 FR 62348 - Erie Boulevard Hydropower L.P.; Notice of Application Tendered for Filing With the Commission and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-18

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Erie Boulevard Hydropower L.P.; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments Take notice that...

  7. NSLS-II injector commissioning and initial operation

    SciTech Connect

    Bacha, B.; Blum, E.; Bassi, B.; Bengtsson, J.; Blednykh, A.; Buda, S.; Cheng, W.; Choi, J.; Cuppolo, J.; D Alsace, R.; Davidsaver, M.; DeLong, J.; Doom, L.; Durfee, d.; fliller, R.; Fulkerson, M.; Ganetis, G.; Gao, F.; Gardner, C.; Guo, W.; Heese, R.; Hidaka, Y.; Hu, Y.; Johanson, M.; Kosciuk, B.; Kowalski, S.; Dramer, S.; Krinsky, S.; Li, Y.; Louie, W.; Maggipinto, M.; Marino, P.; Mead, J.; Oliva, G.; Padrazo, D.; Pedersen, K.; Podobedov, B.; Rainer, R.; Rose, J.; Santana, M.; Seletskiy, S.; Shaftan, T.; Singh, O.; Singh, P.; Smalyuk, V.; Smith, R.; Summers, T.; Tagger, J.; Tian, Y.; Wahl, W.; Wang, G.; Weiner, G.; Willeke, F.; Yang, L.; Yang, X.; Zeitler, E.; Zitvogel, E.; Zuhoski, P.

    2015-05-03

    The injector for the National Synchrotron Light Source II (NSLS-II) storage ring consists of a 3 GeV booster synchrotron and a 200 MeV S-band linac. The linac was designed to produce either a single bunch with a charge of 0.5 nC of electrons or a train of bunches up to 300 ns long containing a total charge of 15 nC. The booster was designed to accelerate up to 15 nC each cycle in a train of bunches up to 300 ns long. Linac commissioning was completed in April 2012. Booster commissioning was started in November 2013 and completed in March 2014. All of the significant design goals were satisfied including beam emittance, energy spread, and transport efficiency. While the maximum booster charge accelerated was only 10 nC, this has proven to be more than sufficient for storage ring commissioning and operation. The injector has operated reliably during storage ring operation since then. Results will be presented showing measurements of linac and booster operating parameters achieved during commissioning and initial operation. Operating experience and reliability during the first year of NSLS-II operation will be discussed.

  8. Commissioning of the CMS High Level Trigger

    SciTech Connect

    Agostino, Lorenzo; et al.

    2009-08-01

    The CMS experiment will collect data from the proton-proton collisions delivered by the Large Hadron Collider (LHC) at a centre-of-mass energy up to 14 TeV. The CMS trigger system is designed to cope with unprecedented luminosities and LHC bunch-crossing rates up to 40 MHz. The unique CMS trigger architecture only employs two trigger levels. The Level-1 trigger is implemented using custom electronics, while the High Level Trigger (HLT) is based on software algorithms running on a large cluster of commercial processors, the Event Filter Farm. We present the major functionalities of the CMS High Level Trigger system as of the starting of LHC beams operations in September 2008. The validation of the HLT system in the online environment with Monte Carlo simulated data and its commissioning during cosmic rays data taking campaigns are discussed in detail. We conclude with the description of the HLT operations with the first circulating LHC beams before the incident occurred the 19th September 2008.

  9. Civil War Sesquicentennial Commission Act

    THOMAS, 112th Congress

    Sen. Webb, Jim [D-VA

    2011-03-16

    05/11/2011 Committee on Energy and Natural Resources Subcommittee on National Parks. Hearings held. With printed Hearing: S.Hrg. 112-124. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  10. Automated Commissioning for Lower-cost, Widely Deployed Building Commissioning of the Future

    SciTech Connect

    Brambley, Michael R.; Katipamula, Srinivas

    2011-08-16

    This chapter takes a brief look at the benefits of commissioning and describes a vision of the future where most of the objectives of commissioning will be accomplished automatically by capabilities built into the building systems themselves. Commissioning will become an activity that is performed continuously rather than periodically, and only repairs requiring replacement or overhaul of equipment will require manual intervention. This chapter then identifies some of the technologies that will be needed to realize this vision and ends with a call for all involved in the enterprise of building commissioning and automation to embrace and dedicate themselves to a future of automated commissioning.

  11. Commissioning the Echo-Seeding Experiment Echo-7 at SLAC

    SciTech Connect

    Weathersby, S.a E.Colby; Dunning, M.; Gilevich, S.; Hast, C.; Jobe, K.; McCormick, D.; Nelson, J.; Raubenheimer, T.O.; Soong, K.; Stupakov, G.; Szalata, Z.; Walz, D.; Woodley, M.; Xiang, D.; Pernet, P-L.; /Ecole Polytechnique, Lausanne

    2011-06-02

    ECHO-7 is a proof-of-principle echo-enabled harmonic generation (EEHG) FEL experiment in the Next Linear Collider Test Accelerator (NLCTA) at SLAC. The experiment is intended to test the EEHG principle at low electron beam energy, 120 MeV, and determine the sensitivities and limitations to understand the expected performance at the higher energy scales and harmonic numbers required for x-ray FELs. In this paper we present the experimental results from the commissioning run of the completed experimental setup which started in April 2010.

  12. Nuclear Regulatory Commission issuances, Volume 44, No. 4

    SciTech Connect

    1996-10-01

    This report includes the issuances received in October 1996. Issuances are from the Commission, the Atomic Safety and Licensing Boards, and the Directors` Decisions. 15 issuances were received and are abstracted individually in the database: Louisiana Energy Services, U.S. Enrichment Corporation, Yankee Atomic Electric Company, General Public Utilities Nuclear Corporation, James L. Shelton, Juan Guzman, Northern States Power Company, TESTCO Inc., Washington Public Power Supply System, all nuclear plants, Cleveland Electric Illuminating Company, Duke Power Company, Florida Power Corporation, and Northeast Nuclear Energy Company (2 issuances). No issuances were received from the the Administrative Law Judges or the Decisions on Petitions for Rulemaking.

  13. 75 FR 36648 - Blue Ribbon Commission on America's Nuclear Future, Disposal Subcommittee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-28

    ... Ribbon Commission on America's Nuclear Future, Disposal Subcommittee AGENCY: Department of Energy, Office of Nuclear Energy. ACTION: Notice of open meeting correction. On June 21, 2010, the Department of Energy published a notice announcing an open meeting of the Disposal Subcommittee, 75 FR 35000, on July...

  14. Handling radiation generated during an ion source commissioning

    SciTech Connect

    Ren, H. T.; Zhao, J. Peng, S. X.; Lu, P. N.; Zhou, Q. F.; Xu, Y.; Chen, J.; Zhang, T.; Zhang, A. L.; Guo, Z. Y.; Chen, J. E.

    2014-02-15

    Radiation is an important issue, which should be carefully treated during the design and commissioning of an ion source. Measurements show that X-rays are generated around the ceramics column of an extraction system when the source is powered up to 30 kV. The X-ray dose increases greatly when a beam is extracted. Inserting the ceramic column into a metal vacuum box is a good way to block X-ray emission for those cases. Moreover, this makes the online test of an intense H{sup +} ion beam with energy up to 100 keV possible. However, for deuteron ion source commissioning, neutron and gamma-ray radiation become a serious topic. In this paper, we will describe the design of the extraction system and the radiation doses of neutrons and gamma-rays measured at different D{sup +} beam energy during our 2.45 GHz deuteron electron cyclotron resonance ion source commissioning for PKUNIFTY (PeKing University Neutron Imaging FaciliTY) project at Peking University.

  15. Handling radiation generated during an ion source commissioning

    NASA Astrophysics Data System (ADS)

    Ren, H. T.; Zhao, J.; Peng, S. X.; Lu, P. N.; Zhou, Q. F.; Xu, Y.; Chen, J.; Zhang, T.; Zhang, A. L.; Guo, Z. Y.; Chen, J. E.

    2014-02-01

    Radiation is an important issue, which should be carefully treated during the design and commissioning of an ion source. Measurements show that X-rays are generated around the ceramics column of an extraction system when the source is powered up to 30 kV. The X-ray dose increases greatly when a beam is extracted. Inserting the ceramic column into a metal vacuum box is a good way to block X-ray emission for those cases. Moreover, this makes the online test of an intense H+ ion beam with energy up to 100 keV possible. However, for deuteron ion source commissioning, neutron and gamma-ray radiation become a serious topic. In this paper, we will describe the design of the extraction system and the radiation doses of neutrons and gamma-rays measured at different D+ beam energy during our 2.45 GHz deuteron electron cyclotron resonance ion source commissioning for PKUNIFTY (PeKing University Neutron Imaging FaciliTY) project at Peking University.

  16. Commissioning the Linac Coherent Light Source injector

    NASA Astrophysics Data System (ADS)

    Akre, R.; Dowell, D.; Emma, P.; Frisch, J.; Gilevich, S.; Hays, G.; Hering, Ph.; Iverson, R.; Limborg-Deprey, C.; Loos, H.; Miahnahri, A.; Schmerge, J.; Turner, J.; Welch, J.; White, W.; Wu, J.

    2008-03-01

    The Linac Coherent Light Source is a SASE x-ray free-electron laser (FEL) project presently under construction at SLAC [J. Arthur , SLAC-R-593, 2002.]. The injector section, from drive laser and rf photocathode gun through first bunch compressor chicane, was installed in the fall of 2006. The initial system commissioning with an electron beam was completed in August of 2007, with the goal of a 1.2-micron emittance in a 1-nC bunch demonstrated. The second phase of commissioning, including second bunch compressor and full linac, is planned for 2008, with FEL commissioning in 2009. We report experimental results and experience gained in the first phase of commissioning, including the photocathode drive laser, rf gun, photocathode, S-band and X-band rf systems, first bunch compressor, and the various beam diagnostics.

  17. 29 CFR 1603.304 - Commission decision.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... EXEMPT STATE AND LOCAL GOVERNMENT EMPLOYEE COMPLAINTS OF EMPLOYMENT DISCRIMINATION UNDER SECTION 304 OF THE GOVERNMENT EMPLOYEE RIGHTS ACT OF 1991 Appeals § 1603.304 Commission decision. (a) On behalf...

  18. 29 CFR 2704.308 - Commission review.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... THE EQUAL ACCESS TO JUSTICE ACT IN COMMISSION PROCEEDINGS Procedures for Considering Applications... presentation of views by opposing parties, review the case and issue its own order affirming, modifying...

  19. 16 CFR 4.15 - Commission meetings.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... mailing list, and will be issued as a press release to interested media. (b) Open meetings. (1) Commission... to be discussed will have any of the effects enumerated in 5 U.S.C. 552b(c). Requests shall...

  20. 43 CFR 10010.41 - Commission responsibility.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... MITIGATION AND CONSERVATION COMMISSION POLICIES AND PROCEDURES FOR IMPLEMENTING THE NATIONAL ENVIRONMENTAL... applicant may print it provided the applicant is bearing the cost of the document pursuant to other laws....

  1. Commissioning medical education: principles for best practice.

    PubMed

    Walsh, Kieran

    2016-04-01

    We need to ensure that we get value for money for our investments in medical education. Commissioning is one method of ensuring that we get value. However, like any other tool, it needs to be used properly. PMID:27071431

  2. 29 CFR 1603.304 - Commission decision.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... EXEMPT STATE AND LOCAL GOVERNMENT EMPLOYEE COMPLAINTS OF EMPLOYMENT DISCRIMINATION UNDER SECTION 304 OF THE GOVERNMENT EMPLOYEE RIGHTS ACT OF 1991 Appeals § 1603.304 Commission decision. (a) On behalf...

  3. Psychosurgery: National Commission Issues Surprisingly Favorable Report

    ERIC Educational Resources Information Center

    Culliton, Barbara J.

    1976-01-01

    Presents results of a national commission's investigation of psychosurgery. Results indicate the procedure to be effective in the cure of patients suffering from pain accompanied by depression, while avoiding the destruction caused by prefrontal lobotomies. (SL)

  4. 76 FR 53159 - CFC-50 Commission Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-25

    ... ``watchdog'' groups. The Commission is co- chaired by Thomas Davis and Beverly Byron. The meeting is open to... 20415. FOR FURTHER INFORMATION CONTACT: Keith Willingham, Director, Combined Federal Campaign,...

  5. 77 FR 10004 - CFC-50 Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-21

    ...'' groups. The Commission is co- chaired by Thomas Davis and Beverly Byron. The meeting is open to the..., 78205. FOR FURTHER INFORMATION CONTACT: Keith Willingham, Director, Combined Federal Campaign,...

  6. 76 FR 72452 - CFC-50 Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-23

    ...'' groups. The Commission is co-chaired by Thomas Davis and Beverly Byron. The meeting is open to the public... INFORMATION CONTACT: Keith Willingham, Director, Combined Federal Campaign, U.S. Office of...

  7. 47 CFR 0.416 - The Federal Communications Commission Record.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false The Federal Communications Commission Record. 0.416 Section 0.416 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMISSION ORGANIZATION General Information Printed Publications § 0.416 The Federal Communications Commission Record. Texts adopted by the Commission or a member of...

  8. 47 CFR 0.416 - The Federal Communications Commission Record.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 1 2012-10-01 2012-10-01 false The Federal Communications Commission Record. 0.416 Section 0.416 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMISSION ORGANIZATION General Information Printed Publications § 0.416 The Federal Communications Commission Record. Texts adopted by the Commission or a member of...

  9. Division II: Commission 10: Solar Activity

    NASA Astrophysics Data System (ADS)

    van Driel-Gesztelyi, Lidia; Scrijver, Karel J.; Klimchuk, James A.; Charbonneau, Paul; Fletcher, Lyndsay; Hasan, S. Sirajul; Hudson, Hugh S.; Kusano, Kanya; Mandrini, Cristina H.; Peter, Hardi; Vršnak, Bojan; Yan, Yihua

    2015-08-01

    The Business Meeting of Commission 10 was held as part of the Business Meeting of Division II (Sun and Heliosphere), chaired by Valentin Martínez-Pillet, the President of the Division. The President of Commission 10 (C10; Solar activity), Lidia van Driel-Gesztelyi, took the chair for the business meeting of C10. She summarised the activities of C10 over the triennium and the election of the incoming OC.

  10. CEBAF SRF Performance during Initial 12 GeV Commissioning

    SciTech Connect

    Bachimanchi, Ramakrishna; Allison, Trent; Daly, Edward; Drury, Michael; Hovater, J; Lahti, George; Mounts, Clyde; Nelson, Richard; Plawski, Tomasz

    2015-09-01

    The Continuous Electron Beam Accelerator Facility (CEBAF) energy upgrade from 6 GeV to 12 GeV includes the installation of eleven new 100 MV cryomodules (88 cavities). The superconducting RF cavities are designed to operate CW at an accelerating gradient of 19.3 MV/m with a QL of 3×107. Not all the cavities were operated at the minimum gradient of 19.3 MV/m with the beam. Though the initial 12 GeV milestones were achieved during the initial commissioning of CEBAF, there are still some issues to be addressed for long term reliable operation of these modules. This paper reports the operational experiences during the initial commissioning and the path forward to improve the performance of C100 (100 MV) modules.

  11. COMMISSIONING AND OPERATION OF THE CEBAF 100 MV CRYOMODULES

    SciTech Connect

    Allison, Trent; Davis, G; Drury, Michael; Harwood, Leigh; Hogan, John; Kimber, Andrew; Lahti, George; Merz, William; Nelson, Richard; Plawski, Tomasz; Seidman, David; Spata, Michael; Wilson, Michael; Hovater, J

    2012-07-01

    The Continuous Electron Beam Accelerator Facility (CEBAF) energy upgrade from 6 GeV to 12 GeV includes the installation of ten new 100 MV cryomodules and RF systems. The superconducting RF cavities are designed to operate CW at a maximum accelerating gradient of 19.3 MV/m. To support the higher gradients and higher Q{sub L} ({approx} 3 x 10{sup 7}), a new RF system has been developed and is being installed to power and control the cavities. The RF system employs digital control and 13 kW klystrons. Recently, two of these cryomodules and associated RF hardware and software have been installed and commissioned in the CEBAF accelerator. Electrons at linac currents up to 540 {micro}A have been successfully accelerated and used for nuclear physics experiments. This paper reports on the commissioning and operation of the RF system and cryomodules.

  12. Nuclear Regulatory Commission Information Digest 1994 edition. Volume 6

    SciTech Connect

    Stadler, L.

    1994-03-01

    The Nuclear Regulatory Commission Information Digest (digest) provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRCs regulatory responsibility the activities NRC licenses, and general information on domestic and worldwide nuclear energy. The digest, published annually, is a compilation of nuclear-and NRC-related data and is designed to provide a quick reference to major facts about the agency and the industry it regulates. In general, the data cover 1975 through 1993, with exceptions noted. Information on generating capacity and average capacity factor for operating US commercial nuclear power reactors is obtained from monthly operating reports that are submitted directly to the NRC by the information is reviewed by the NRC for consistency only and no independent validation and/or verification is performed.

  13. Fermilab Main Injector Collimation Systems: Design, Commissioning and Operation

    SciTech Connect

    Brown, Bruce; Adamson, Philip; Capista, David; Drozhdin, A.I.; Johnson, David E.; Kourbanis, Ioanis; Mokhov, Nikolai V.; Morris, Denton K.; Rakhno, Igor; Seiya, Kiyomi; Sidorov, Vladimir; /Fermilab

    2009-05-01

    The Fermilab Main Injector is moving toward providing 400 kW of 120 GeV proton beams using slip stacking injection of eleven Booster batches. Loss of 5% of the beam at or near injection energy results in 1.5 kW of beam loss. A collimation system has been implemented to localize this loss with the design emphasis on beam not captured in the accelerating RF buckets. More than 95% of these losses are captured in the collimation region. We will report on the construction, commissioning and operation of this collimation system. Commissioning studies and loss measurement tools will be discussed. Residual radiation monitoring of the Main Injector machine components will be used to demonstrate the effectiveness of these efforts.

  14. The Spallation Neutron Source Beam Commissioning and Initial Operations

    SciTech Connect

    Henderson, Stuart; Aleksandrov, Alexander V.; Allen, Christopher K.; Assadi, Saeed; Bartoski, Dirk; Blokland, Willem; Casagrande, F.; Campisi, I.; Chu, C.; Cousineau, Sarah M.; Crofford, Mark T.; Danilov, Viatcheslav; Deibele, Craig E.; Dodson, George W.; Feshenko, A.; Galambos, John D.; Han, Baoxi; Hardek, T.; Holmes, Jeffrey A.; Holtkamp, N.; Howell, Matthew P.; Jeon, D.; Kang, Yoon W.; Kasemir, Kay; Kim, Sang-Ho; Kravchuk, L.; Long, Cary D.; McManamy, T.; Pelaia, II, Tom; Piller, Chip; Plum, Michael A.; Pogge, James R.; Purcell, John David; Shea, T.; Shishlo, Andrei P; Sibley, C.; Stockli, Martin P.; Stout, D.; Tanke, E.; Welton, Robert F; Zhang, Y.; Zhukov, Alexander P

    2015-09-01

    The Spallation Neutron Source (SNS) accelerator delivers a one mega-Watt beam to a mercury target to produce neutrons used for neutron scattering materials research. It delivers ~ 1 GeV protons in short (< 1 us) pulses at 60 Hz. At an average power of ~ one mega-Watt, it is the highest-powered pulsed proton accelerator. The accelerator includes the first use of superconducting RF acceleration for a pulsed protons at this energy. The storage ring used to create the short time structure has record peak particle per pulse intensity. Beam commissioning took place in a staged manner during the construction phase of SNS. After the construction, neutron production operations began within a few months, and one mega-Watt operation was achieved within three years. The methods used to commission the beam and the experiences during initial operation are discussed.

  15. Automated Demand Response Strategies and Commissioning CommercialBuilding Controls

    SciTech Connect

    Piette, Mary Ann; Watson, David; Motegi, Naoya; Kiliccote, Sila; Linkugel, Eric

    2006-05-01

    California electric utilities have been exploring the use of dynamic critical peak pricing (CPP) and other demand response programs to help reduce peaks in customer electric loads. CPP is a new electricity tariff design to promote demand response. This paper begins with a brief review of terminology regarding energy management and demand response, followed by a discussion of DR control strategies and a preliminary overview of a forthcoming guide on DR strategies. The final section discusses experience to date with these strategies, followed by a discussion of the peak electric demand savings from the 2005 Automated CPP program. An important concept identified in the automated DR field tests is that automated DR will be most successful if the building commissioning industry improves the operational effectiveness of building controls. Critical peak pricing and even real time pricing are important trends in electricity pricing that will require new functional tests for building commissioning.

  16. Nuclear Regulatory Commission Information Digest 1992 edition. Volume 4

    SciTech Connect

    Olive, K

    1992-03-01

    The Nuclear Regulatory Commission Information Digest provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRC's regulatory responsibilities, the activities NRC licenses, and general information on domestic and worldwide nuclear energy. This digest is a compilation of nuclear- and NRC-related data and is designed to provide a quick reference to major facts about the agency and industry it regulates. In general, the data cover 1975 through 1991, with exceptions noted. Information on generating capacity and average capacity factor for operating US commercial nuclear power reactors is obtained from monthly operating reports that are submitted directly to the NRC by the licensee. This information is reviewed by the NRC for consistency only and no independent validation and/or verification is performed.

  17. Courts and Commissions: Fish or foul

    SciTech Connect

    Radford, B.W.

    1993-10-15

    Hydropower is under attack everywhere you look. It started back in the sixties during the battle over Arizona's Glen Canyon Dam. That case purportedly ended in a compromise with the Sierra Club to save the Grand Canyon from hydro development. But once built, the dam played havoc with Colorado River levels, disrupting rafting trips for Grand Canyon tourists. Even Barry Goldwater was later heard to rue the Glen Canyon project. Marc Reisner's 1986 book, Cadillac Desert, galvanized the antihydro faction. A few years later, calls arose for the City of San Francisco to dismantle its O'Shaughnessy Dam across the Hetch Hetchy Valley in the Sierra Nevada, just 15 miles north of famed Yosemite. That move failed. (Maybe San Francisco's oddball reputation had something to do with the result). But now we hear of plans underway to tear down dams on the Elwah River in Washington State's Olympic National Park, to reclaim lost salmon spawning grounds and return the parks to its natural state. This time the dam busters may win. These events are not unconnected. Strung together, they reveal a change in the popular opinion of how rivers, streams, and coastlines contribute to our economic well-being, and how the federal government should manage those economic resources. Federal hydropower control was born to govern our navigable waterways. It grew up as a tool to speed electrification and develop mining and logging. But forces today are seeking to make federal hydropower law more sympathetic to wildlife preservation. They argue that wildlife represents a national economic resource - no less so than timber, minerals, and shipping. This view is winning support from those in high positions, including the Chair of the Federal Energy Regulatory Commission, Elizabeth Moler.

  18. 75 FR 3448 - Federal Advisory Committee; Military Leadership Diversity Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-21

    ... of the Secretary Federal Advisory Committee; Military Leadership Diversity Commission AGENCY... the Military Leadership Diversity Commission (hereafter referred to as the Commission) on January 15... leadership position with either a Military Department command or combatant command; (b) a retired general...

  19. 39 CFR 3002.10 - The Commission and its offices.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... reading room where the Commission's public records are available for inspection and copying; a library... are held on matters before the Commission. The Commission also maintains an electronic reading...

  20. 75 FR 6339 - California Public Utilities Commission Petition for Rulemaking

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-09

    ... Rulemaking Proceedings, 63 FR 24121 (1998). Electronic Filers: Comments may be filed electronically using the... COMMISSION 47 CFR Part 4 California Public Utilities Commission Petition for Rulemaking AGENCY: Federal Communications Commission. ACTION: Petition for rulemaking. SUMMARY: The California Public Utilities...

  1. 75 FR 75335 - Integration of Variable Energy Resources

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-02

    ... Energy Federal Energy Regulatory Commission 18 CFR Part 35 Integration of Variable Energy Resources...; ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission 18 CFR Part 35 Integration of Variable Energy Resources November 18, 2010. AGENCY: Federal Energy Regulatory Commission. ACTION: Notice of...

  2. Initial results of the commissioning of the HRIBF recoil mass spectrometer

    SciTech Connect

    Gross, C.J.; Akovali, Y.A.; Brinkman, M.J.; Mas, J.; McConnell, J.W.; Milner, W.T.; Shapira, D.; Ginter, T.N.; James, A.N.

    1996-10-01

    The recoil mass spectrometer at the Holifield Radioactive Ion Beam Facility is currently undergoing commissioning tests. This new spectrometer is designed to transmit ions with rigidities of K = 100 resulting from fusion-evaporation reactions using inverse-kinematics. The device consists of two sections: a momentum separator to provide beam rejection and a mass separator for product identification. Using normal-kinematic and symmetric reactions, the commissioning tests have shown that the A/Q acceptance is almost {+-}5%, the energy acceptance is approximately {+-}12%, and there has been little, if any, primary beam observed on the focal plane. Commissioning tests are presently underway with reactions using inverse-kinematics.

  3. Commissioning of a microprobe-XRF beamline (BL-16) on Indus-2 synchrotron source

    NASA Astrophysics Data System (ADS)

    Tiwari, M. K.; Gupta, P.; Sinha, A. K.; Garg, C. K.; Singh, A. K.; Kane, S. R.; Garg, S. R.; Lodha, G. S.

    2012-06-01

    We report commissioning of the microprobe-XRF beamline on Indus-2 synchrotron source. The beamline has been recently made operational and is now open for the user's experiments. The beamline comprises of Si(111) double crystal monochromator and Kirkpatrick-Baez focusing optics. The beamline covers wide photon energy range of 4 - 20 keV using both collimated and micro-focused beam modes. The design details and the first commissioning results obtained using this beamline are presented.

  4. Commissioning of a microprobe-XRF beamline (BL-16) on Indus-2 synchrotron source

    SciTech Connect

    Tiwari, M. K.; Gupta, P.; Sinha, A. K.; Garg, C. K.; Singh, A. K.; Kane, S. R.; Garg, S. R.; Lodha, G. S.

    2012-06-05

    We report commissioning of the microprobe-XRF beamline on Indus-2 synchrotron source. The beamline has been recently made operational and is now open for the user's experiments. The beamline comprises of Si(111) double crystal monochromator and Kirkpatrick-Baez focusing optics. The beamline covers wide photon energy range of 4 - 20 keV using both collimated and micro-focused beam modes. The design details and the first commissioning results obtained using this beamline are presented.

  5. Accreditation. Chassin and Joint Commission aim to inspire. Interview by Howard Larkin.

    PubMed

    Chassin, Mark; Conway, James B; Umbdenstock, Richard J; Dwyer, James; Langberg, Michael L; Petasnick, William D

    2010-03-01

    After two years at the helm of the Joint Commission, Mark Chassin, M.D., is pressing forward with efforts to turn the Joint Commission into a partner with hospitals and other providers and transform health care into a "high reliability" enterprise along the lines of the aviation and nuclear energy industries. Hospitals & Health Networks asked health care experts and Chassin himself how he's doing so far. PMID:20377090

  6. 77 FR 73636 - Rock River Beach, Inc.; Notice of Application Tendered for Filing With the Commission and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-11

    ... Energy Regulatory Commission Rock River Beach, Inc.; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests Take notice that the following hydroelectric application... River Beach, Inc. e. Name of Project: Rock River Beach Hydroelectric Project. f. Location: On the...

  7. 77 FR 2966 - Rock River Beach, Inc.; Notice of Application Tendered for Filing With the Commission and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-20

    ... Energy Regulatory Commission Rock River Beach, Inc.; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests Take notice that the following hydroelectric application... River Beach, Inc. e. Name of Project: Rock River Beach Hydroelectric Project. f. Location: On the...

  8. 77 FR 99 - Barren River Lake Hydro LLC; Notice of Application Tendered for Filing With the Commission...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-03

    ... Energy Regulatory Commission Barren River Lake Hydro LLC; Notice of Application Tendered for Filing With the Commission, Soliciting Additional Study Requests, and Establishing Procedural Schedule for... River Lake Hydro LLC (Barren Hydro). e. Name of Project: Barren River Lake Dam Hydroelectric Project....

  9. Division G Commission 45: Stellar Classification

    NASA Astrophysics Data System (ADS)

    Gray, Richard; Soubiran, Caroline; Nordström, Birgitta; Burgasser, Adam; Gupta, Ranjan; Hanson, Margaret; Leggett, Sandy K.; Soubiran, Caroline; Singh, Harinder P.; Nordström, Birgitta

    2016-04-01

    Commission 45 is solidly anchored in the beginnings of the IAU. It evolved out of Commission 29, which was one of the original commissions and whose title and emphasis was the Spectral Classification of Stars (Transactions of the IAU, Volume I, 1922). C29 was formed with W.S. Adams (Pasadena) as president. Its first members were Miss Cannon, R.H. Curtiss, A. Fowler, A. de Gramont, M. Hamy, H.F. Newall, J.S. Plaskett, H.N. Russell, all very much part of the history of stellar spectroscopy. In the 1922 Transactions report it was recognized the Harvard System of spectral classification ``has already been adopted by international agreement. . .''

  10. VINCI: the VLT Interferometer commissioning instrument

    NASA Astrophysics Data System (ADS)

    Kervella, Pierre; Coudé du Foresto, Vincent; Glindemann, Andreas; Hofmann, Reiner

    2000-07-01

    The Very Large Telescope Interferometer (VLTI) is a complex system, made of a large number of separated elements. To prepare an early successful operation, it will require a period of extensive testing and verification to ensure that the many devices involved work properly together, and can produce meaningful data. This paper describes the concept chosen for the VLTI commissioning instrument, LEONARDO da VINCI, and details its functionalities. It is a fiber based two-way beam combiner, associated with an artificial star and an alignment verification unit. The technical commissioning of the VLTI is foreseen as a stepwise process: fringes will first be obtained with the commissioning instrument in an autonomous mode (no other parts of the VLTI involved); then the VLTI telescopes and optical trains will be tested in autocollimation; finally fringes will be observed on the sky.

  11. Legislative Priorities of the Commission, 1988. Commission Report 88-2.

    ERIC Educational Resources Information Center

    California State Postsecondary Education Commission, Sacramento.

    An outline is provided, for its staff, of the seven priorities of the California Postsecondary Education Commission (CPEC), during the second half of the California State Legislature's 1987-88 session. The report states that the Commission's staff will: (1) work with legislators and the Governor's staff to develop and implement appropriate…

  12. Boys' Reading Commission 2012: A Review of Existing Research Conducted to Underpin the Commission

    ERIC Educational Resources Information Center

    Clark, Christina

    2012-01-01

    The gender gap has been a hotly debated issue, both nationally and internationally. In 2000, the then Department for Education and Schools commissioned a four-year study into raising boys' achievement. The commission worked with over 60 primary, secondary and special schools in England to identify and evaluate the strategies highlighted to be…

  13. 78 FR 57818 - Commission Participation and Commission Employee Involvement in Voluntary Standards Activities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-20

    ... the development of voluntary standards (43 FR 19216 (May 4, 1978)). Acknowledging the contribution... Commission Employee Involvement in Voluntary Standards Activities. 54 FR 6646 (Feb. 14, 1989). In 2006, the Commission amended several provisions of part 1031. 71 FR 38754 (July 10, 2006). Among other things, the...

  14. National Commission on Excellence in Teacher Education: Commissioned Papers from the Regional Hearings. ERIC Digest.

    ERIC Educational Resources Information Center

    Butler, Catherine

    The National Commission on Excellence in Teacher Education was appointed in 1983 to describe the present state of teacher education, identify problem issues, and make recommendations for the improvement of teacher education. The final report of the Commission, "A Call for Change in Teacher Education," was based on information gathered at the…

  15. 33 CFR 209.50 - Mississippi River Commission: Public observation of Commission meetings.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... agenda of meetings. (1) The meetings of the Commission, except those held on Government boats during... the Commissioners, prepare a detailed agenda for planned Commission meetings at the earliest practicable time. Suggestions from the public of proposed agenda items are invited. (d) Public notices...

  16. Nuclear Regulatory Commission Issuances. Opinions and decisions of the Nuclear Regulatory Commission with selected orders: July 1, 1992--December 31, 1992, Volume 36, Pages 1--396

    SciTech Connect

    Not Available

    1992-12-31

    This is the thirty-sixth volume of issuances (1-396) of the Nuclear Regulatory Commission and its Atomic Safety and Licensing Boards, Administrative Law Judges, and Office Directors. It covers the period from July 1, 1992-December 31, 1992. Atomic Safety and Licensing Boards are authorized by Section 191 of the Atomic Energy Act of 1954. These Boards, comprised of three members conduct adjudicatory hearings on applications to construct and operate nuclear power plants and related facilities and issue initial decisions which, subject to internal review and appellate procedures, become the final Commission action with respect to those applications. Boards are drawn from the Atomic Safety and Licensing Board Panel, comprised of lawyers, nuclear physicists and engineers, environmentalists, chemists, and economists. The Atomic Energy Commission first established Licensing Boards in 1962 and the Panel in 1967.

  17. Division XII: Commission 6: Astronomical Telegrams

    NASA Astrophysics Data System (ADS)

    Samus, N. N.; Yamaoka, H.; Gilmore, A. C.; Aksnes, K.; Green, D. W. E.; Marsden, B. G.; Nakano, S.; Lara, Martin; Pitjeva, Elena V.; Sphar, T.; Ticha, J.; Williams, G.

    2015-08-01

    IAU Commission 6 ``Astronomical Telegrams'' had a single business meeting during the Beijing General Assembly of the IAU. It took place on Friday, August 24, 2012. The meeting was attended by five C6 members (N. N. Samus; D. W. E. Green; S. Nakano; J. Ticha; and H. Yamaoka). Also present was Prof. F. Genova as a representative of the IAU Division B. She told the audience about the current restructuring of IAU Commissions and Divisions and consequences for the future of C6.

  18. COMMISSIONING OF RHIC AT 100 GEV / NUCLEON.

    SciTech Connect

    TRBOJEVIC,D.; AHRENS,L.; BLASKIEWICZ,M.; BRENNAN,J.M.; BAI,M.; CAMERON,P.; CARDONA,J.; CONNOLLY,R.; DREES,A.; FLILLER,R.P.; ET AL

    2002-06-02

    This report describes commissioning of the Relativistic Heavy Ion Collider (RHIC) for 100 GeV/nucleon collisions at designed luminosity. To achieve these goals new systems had to be commissioned: Gamma-t transition crossing jump quadrupoles, rebucketing with the new RF storage cavities, phase lock loop feedback, betatron and crystal collimation, beta squeeze along the ramp, Siberian snake magnets for the proton polarization run, AC dipole system chromaticity measurements along the acceleration ramp, orbit correction, new ramp management system, upgraded sequencer, new data instrumentation and logger acquisition system etc.

  19. Commission 26: Double and Multiple Stars

    NASA Astrophysics Data System (ADS)

    Allen, Christine; Docobo, Jose A. D.; Hartkopf, William I.; Balega, Yuri I.; Davis, John; Mason, Brian D.; Oblak, Edouard; Oswalt, Terry D.; Pourbaix, Dimitri; Scarfe, Colin D.

    Although we were happy to welcome over 20 new members at the Prague meeting, Commission 26 is still one of the smallest in the IAU. Notwithstanding its size, it continues to carry on an active and diversified program of activities. Our web site, maintained at the US Naval Observatory, contains further information on the Commission. The site includes links to other relevant sites, to databases and catalogues, an archive of our Information Circulars, a list of upcoming meetings of interest, as well as an extensive bibliography of recently published papers on double and multiple stars. The site can be accessed at .

  20. Environmental externalities: A survey of state commission actions

    SciTech Connect

    Cohen, S.D.; Eto, J.H.; Goldman, C.A.; Beldock, J.; Crandall, G.

    1990-05-01

    Awareness of the environmental consequences of electricity production have led many state public utility commissions (PUC) to consider these externalities formally in their regulation of utilities. At the request of NARUC`s Energy Conservation staff subcommittee, the Lawrence Berkeley Laboratory conducted a survey to identify the extent and range of PUC approaches to this issue; responses were obtained from PUC staff in 49 states and the District of Columbia. The study should be viewed as providing a ``snapshot`` of regulatory developments in an area that is evolving rapidly. 16 refs.

  1. Environmental externalities: A survey of state commission actions

    SciTech Connect

    Cohen, S.D.; Eto, J.H. ); Goldman, C.A. ); Beldock, J. . Office of Buildings and Community Systems); Crandall, G. )

    1990-05-01

    Awareness of the environmental consequences of electricity production have led many state public utility commissions (PUC) to consider these externalities formally in their regulation of utilities. At the request of NARUC's Energy Conservation staff subcommittee, the Lawrence Berkeley Laboratory conducted a survey to identify the extent and range of PUC approaches to this issue; responses were obtained from PUC staff in 49 states and the District of Columbia. The study should be viewed as providing a snapshot'' of regulatory developments in an area that is evolving rapidly. 16 refs.

  2. Search for invisible nucleon decay in SNO + during commissioning phase

    NASA Astrophysics Data System (ADS)

    Coulter, Ian; SNO+ Collaboration

    2015-04-01

    The SNO + experiment aims to explore several topics in neutrino physics, including neutrinoless double beta decay and low energy solar neutrinos. For its initial commissioning phase, SNO + will fill its inner vessel with light water and run to evaluate the performance of the detector and electronics. During this water-fill phase, it will have a unique sensitivity to certain modes of invisible nucleon decay, where the nucleon decays to a mode in which the decay products are not detected, e.g. to 3 neutrinos. With just a couple of months of water running, SNO + is expected to set an improved model independent limit on the current bounds.

  3. Will the Commission's hydropower program revive in the '90s

    SciTech Connect

    O'Connor, G.C.

    1993-01-01

    Prior to the enactment of the Electric Consumer Protection Act of 1986 (ECPA), the Commission for 66 years oversaw the nation's water power potential with uncompromising authority. Since ECPA, the Commission has been very slow and tentative in its approach to licensing hydropower projects under Part I of the Federal Power Act. In that time, the hydropower industry has found itself in an almost impossible situation. It has been burdened with heavy regulatory requirements laden with a consulation process that frequently engenders adversarial conflicts with public interest groups and state and federal agencies. The process leads to a license with too much uncertainty to generally proceed with construction of the proposed project. This article assesses the current status of the hydropower industry so that the industry's future may be realistically assessed. The analysis begins in 1978 when Congress enacted landmark energy legislation that initiated, among other things, a [open quotes]hydro gold rush.[close quotes] What immediately follows is a historical review of this period, which includes a discussion of the response of the environmental community and the consequent legal battles fought in the 1980s. The analysis concludes with some comments on how the Energy Policy Act of 1992 affects the prospects of hydropower continuing as a viable energy source in the next century.

  4. 75 FR 36648 - Blue Ribbon Commission on America's Nuclear Future, Reactor and Fuel Cycle Technologies Subcommittee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-28

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Blue Ribbon Commission on America's Nuclear Future, Reactor and Fuel Cycle Technologies Subcommittee AGENCY: Office of Nuclear Energy, DOE. ACTION: Notice of open meeting correction. On June 21, 2010,...

  5. Commissioning and Performance Analysis of WhisperGen Stirling Engine

    NASA Astrophysics Data System (ADS)

    Pradip, Prashant Kaliram

    Stirling engine based cogeneration systems have potential to reduce energy consumption and greenhouse gas emission, due to their high cogeneration efficiency and emission control due to steady external combustion. To date, most studies on this unit have focused on performance based on both experimentation and computer models, and lack experimental data for diversified operating ranges. This thesis starts with the commissioning of a WhisperGen Stirling engine with components and instrumentation to evaluate power and thermal performance of the system. Next, a parametric study on primary engine variables, including air, diesel, and coolant flowrate and temperature were carried out to further understand their effect on engine power and efficiency. Then, this trend was validated with the thermodynamic model developed for the energy analysis of a Stirling cycle. Finally, the energy balance of the Stirling engine was compared without and with heat recovery from the engine block and the combustion chamber exhaust.

  6. Gore-Mbeki Binational Commission integrated housing program. Final report

    SciTech Connect

    1998-12-31

    This report documents the work done under Grant DE-FG36-97GO10209, Innovative Renewable Energy Technology Transfer Program. PEER Consultants, PC, and its subcontractor, PEER Africa (Pty.) Ltd., received an $88,000.00 grant to plan and build two energy efficient homes in the black township of Gugulethu in Cape Town, South Africa. These demonstration homes were given to the people of South Africa as a gesture of goodwill by the US government as part of the Gore-Mbeki Binational Commission (BNC) agreements and cooperation. The BNC is the term used to describe the agreement to work together by the US and the South African governments for economic development of South Africa in the areas of energy, commerce, agriculture, housing, and transportation. The BNC was formed in 1995. This project under the auspices of the BNC started in September 1996. The DOE-funded portion was performed between January 11, 1997 and February 28, 1997.

  7. A summary of the California Public Utilities Commission`s two competing electric utility restructuring proposals

    SciTech Connect

    Porter, K

    1995-11-01

    In May 1995, the California Public Utilities Commission (CPUC) released two proposals for restructuring the state`s electric power industry. The two proposals follow more than a year of testimony and public comment after the CPUC issued the ``Blue Book`` (CPUC 1994a) on April 20, 1994, which called for retail wheeling to be phased in to all customers over 5 years. The majority proposal, supported by three of the four CPUC commissioners (one seat was vacant when the proposals were released), calls for creating a central pool, or ``poolco``; setting electric prices to reflect true costs of service, or ``real-time pricing``; and allowing parties to negotiate ``contracts for differences`` between the pool price and the contract price. The minority proposal, sponsored by Commissioner Jesse Knight, calls for retail wheeling, or ``direct access,`` and for utilities to divest or spin off their generating assets. This paper presents a summary of the major provisions of the two CPUC proposals and the possible implications and issues associated with each. It is aimed at researchers who may be aware that various efforts to restructure the electric power industry are under way and want to known more about California`s proposals, as well as those who want to known the implications of certain restructuring proposals for renewable energy technologies. Presented at the end of the paper is a summary of alternative proposals promoted by various stakeholder in response to the two CPUC proposals.

  8. Commission on Child Online Protection (COPA) Report to Congress. Appendices.

    ERIC Educational Resources Information Center

    2000

    The appendices for the Commission on Child Online Protection (COPA) Report to Congress, October 20, 2000, include the following: Commission overview, which includes scope and timeline, original statute, amended statute, technologies and methods, and biographies of the commissioners; Commission finances; Commission meetings for the year 2000;…

  9. 29 CFR 2200.93 - Briefs before the Commission.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Briefs before the Commission. 2200.93 Section 2200.93 Labor... Posthearing Procedures § 2200.93 Briefs before the Commission. (a) Requests for briefs. The Commission ordinarily will request the parties to file briefs on issues before the Commission. After briefs...

  10. 76 FR 31307 - Commission of Fine Arts; Notice of Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-31

    ... From the Federal Register Online via the Government Publishing Office COMMISSION OF FINE ARTS Commission of Fine Arts; Notice of Meeting The next meeting of the U.S. Commission of Fine Arts is scheduled... oral statements should be addressed to Thomas Luebke, Secretary, U.S. Commission of Fine Arts, at...

  11. 28 CFR 0.124 - United States Parole Commission.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 1 2013-07-01 2013-07-01 false United States Parole Commission. 0.124 Section 0.124 Judicial Administration DEPARTMENT OF JUSTICE ORGANIZATION OF THE DEPARTMENT OF JUSTICE United States Parole Commission § 0.124 United States Parole Commission. The U.S. Parole Commission...

  12. 28 CFR 0.124 - United States Parole Commission.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 1 2012-07-01 2012-07-01 false United States Parole Commission. 0.124 Section 0.124 Judicial Administration DEPARTMENT OF JUSTICE ORGANIZATION OF THE DEPARTMENT OF JUSTICE United States Parole Commission § 0.124 United States Parole Commission. The U.S. Parole Commission...

  13. 28 CFR 0.124 - United States Parole Commission.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28 Judicial Administration 1 2014-07-01 2014-07-01 false United States Parole Commission. 0.124 Section 0.124 Judicial Administration DEPARTMENT OF JUSTICE ORGANIZATION OF THE DEPARTMENT OF JUSTICE United States Parole Commission § 0.124 United States Parole Commission. The U.S. Parole Commission...

  14. 28 CFR 0.124 - United States Parole Commission.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 28 Judicial Administration 1 2011-07-01 2011-07-01 false United States Parole Commission. 0.124 Section 0.124 Judicial Administration DEPARTMENT OF JUSTICE ORGANIZATION OF THE DEPARTMENT OF JUSTICE United States Parole Commission § 0.124 United States Parole Commission. The U.S. Parole Commission...

  15. 17 CFR 144.1 - Service upon the Commission.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... RESPONSE TO SUBPOENAS OR OTHER DEMANDS OF A COURT § 144.1 Service upon the Commission. (a) Subject to... service of a demand directed to the Commission or to an employee of the Commission for documentary... demand must be addressed to the Secretary of the Commission, Three Lafayette Centre, 1155 21st Street,...

  16. 47 CFR 1.1 - Proceedings before the Commission.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 1 2014-10-01 2014-10-01 false Proceedings before the Commission. 1.1 Section 1.1 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL PRACTICE AND PROCEDURE General Rules of Practice and Procedure General § 1.1 Proceedings before the Commission. The Commission may on...

  17. 47 CFR 1.1 - Proceedings before the Commission.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 1 2013-10-01 2013-10-01 false Proceedings before the Commission. 1.1 Section 1.1 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL PRACTICE AND PROCEDURE General Rules of Practice and Procedure General § 1.1 Proceedings before the Commission. The Commission may on...

  18. 47 CFR 1.1 - Proceedings before the Commission.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 1 2012-10-01 2012-10-01 false Proceedings before the Commission. 1.1 Section 1.1 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL PRACTICE AND PROCEDURE General Rules of Practice and Procedure General § 1.1 Proceedings before the Commission. The Commission may on...

  19. Historical Reflections on the Work of Commission 4

    NASA Astrophysics Data System (ADS)

    Hohenkerk, Catherine; Arlot, Jean-Eudes; Kaplan, George; Bangert, John A.; Bell, Steven A.; Ferrandiz, Jose M.; Fienga, Agnes; Folkner, William; Lukashova, Marina; Pitjeva, Elena V.; Soma, Mitsuru; Thuillot, William; Urban, Sean E.

    2016-04-01

    Commission 4 was among the first set of commissions formed within the IAU at its founding in 1919. (Commissions were originally called ``Standing Committees.'') During its 96 years of service to the IAU and astronomical community in general, the commission has been fortunate to have been led by many distinguished scientists - see the list of presidents below.

  20. 16 CFR 1000.6 - Commission decisions and records.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... action, if known. (b) Other records in the custody of the Commission may be requested by e-mail (cpsc-os... Record of Commission Action. Copies of Minutes or of a Record of Commission Action may be obtained by e-mail (cpsc-os@cpsc.gov) or written request to the Secretary, Consumer Product Safety Commission,...