25 CFR 700.465 - Technical feasibility.
Code of Federal Regulations, 2010 CFR
2010-04-01
... construction, technology, or another engineering project, however, an application for a construction, technology or another engineering project shall: (a) Include sufficient information to determine the nature... construction, technology, or other engineering project prior to construction. The Commission shall review the...
25 CFR 700.465 - Technical feasibility.
Code of Federal Regulations, 2012 CFR
2012-04-01
... construction, technology, or another engineering project, however, an application for a construction, technology or another engineering project shall: (a) Include sufficient information to determine the nature... construction, technology, or other engineering project prior to construction. The Commission shall review the...
25 CFR 700.465 - Technical feasibility.
Code of Federal Regulations, 2014 CFR
2014-04-01
... construction, technology, or another engineering project, however, an application for a construction, technology or another engineering project shall: (a) Include sufficient information to determine the nature... construction, technology, or other engineering project prior to construction. The Commission shall review the...
25 CFR 700.465 - Technical feasibility.
Code of Federal Regulations, 2011 CFR
2011-04-01
... construction, technology, or another engineering project, however, an application for a construction, technology or another engineering project shall: (a) Include sufficient information to determine the nature... construction, technology, or other engineering project prior to construction. The Commission shall review the...
25 CFR 700.465 - Technical feasibility.
Code of Federal Regulations, 2013 CFR
2013-04-01
... construction, technology, or another engineering project, however, an application for a construction, technology or another engineering project shall: (a) Include sufficient information to determine the nature... construction, technology, or other engineering project prior to construction. The Commission shall review the...
Code of Federal Regulations, 2014 CFR
2014-10-01
... further study and selection of one project for final design, engineering, and construction funding. 268.21... and selection of one project for final design, engineering, and construction funding. (a) Upon... analyses necessary prior to initiation of construction. Final design and engineering work will also be...
Code of Federal Regulations, 2010 CFR
2010-10-01
... further study and selection of one project for final design, engineering, and construction funding. 268.21... and selection of one project for final design, engineering, and construction funding. (a) Upon... analyses necessary prior to initiation of construction. Final design and engineering work will also be...
Code of Federal Regulations, 2011 CFR
2011-10-01
... further study and selection of one project for final design, engineering, and construction funding. 268.21... and selection of one project for final design, engineering, and construction funding. (a) Upon... analyses necessary prior to initiation of construction. Final design and engineering work will also be...
Code of Federal Regulations, 2012 CFR
2012-10-01
... further study and selection of one project for final design, engineering, and construction funding. 268.21... and selection of one project for final design, engineering, and construction funding. (a) Upon... analyses necessary prior to initiation of construction. Final design and engineering work will also be...
Code of Federal Regulations, 2013 CFR
2013-10-01
... further study and selection of one project for final design, engineering, and construction funding. 268.21... and selection of one project for final design, engineering, and construction funding. (a) Upon... analyses necessary prior to initiation of construction. Final design and engineering work will also be...
NASA Astrophysics Data System (ADS)
Shi, Yu-Fang; Ma, Yi-Yi; Song, Ping-Ping
2018-03-01
System Reliability Theory is a research hotspot of management science and system engineering in recent years, and construction reliability is useful for quantitative evaluation of project management level. According to reliability theory and target system of engineering project management, the defination of construction reliability appears. Based on fuzzy mathematics theory and language operator, value space of construction reliability is divided into seven fuzzy subsets and correspondingly, seven membership function and fuzzy evaluation intervals are got with the operation of language operator, which provides the basis of corresponding method and parameter for the evaluation of construction reliability. This method is proved to be scientific and reasonable for construction condition and an useful attempt for theory and method research of engineering project system reliability.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1970-03-01
The work described in this volume of ``S`` Projects History is an extension of the type of work described in Volume I. E.I. du Pont de flemours & Company had entered into Contract AT (07-2)-l with the United States Atomic Energy Commission to develop, design, construct, install, and operate facilities to produce heavy water, fissionable materials, and related products. Under this contract,, Du Pont constructed and operated the Savannah River Plant. The engineering, design, and construction for most of the larger ``S`` projects was performed by the Engineering DeDartment. For some of the large and many of the smaller projectsmore » the Engineering Department was responsible only for the construction because the Atomic Energy Division (AED) of the Explosives Department handled the other phases. The Engineering Department Costruction Division also performed the physical work for many of the plant work orders. This volume includes a general description of the Du Pont Engineering Department activities pertaining to the engineering, design, and construction of the ``S`` projects at the Savannah River Plant; brief summaries of the projects and principal work requests; and supplementary informaticn on a few subjects in Volume I for which final data was not available at the closing date. Projects and other plant engineering work which were handled entirely by the Explosives Department -- AED are not included in this history.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
McCullough, M. C.; Ebeling-Koning, D.; Evans, M. C.
2012-07-01
The lessons learned during the early phase of design engineering and construction activities for the AP1000 China Project can be applied to any project involving multiple disciplines and multiple organizations. Implementation of a first-of-a-kind design to directly support construction activities utilizing resources assigned to design development and design delivery creates challenges with prioritization of activities, successful closure of issues, and communication between site organizations and the home office. To ensure successful implementation, teams were assigned and developed to directly support construction activities including prioritization of activities, site communication and ensuring closure of site emergent issues. By developing these teams, themore » organization is better suited to meet the demands of the construction schedule while continuing with design evolution of a standard plant and engineering delivery for multiple projects. For a successful project, proper resource utilization and prioritization are key for overcoming obstacles and ensuring success of the engineering organization. (authors)« less
Railway project design and construction (CEE 411) course updates.
DOT National Transportation Integrated Search
2017-01-20
Course CEE 411 "Railway Project Design and Construction" is a cornerstone of the railway : engineering education program developed by the Rail Transportation and Engineering Center : (RailTEC) at the University of Illinois at Urbana-Champaign (UIUC)....
Enhancing Knowledge Sharing Management Using BIM Technology in Construction
Ho, Shih-Ping; Tserng, Hui-Ping
2013-01-01
Construction knowledge can be communicated and reused among project managers and jobsite engineers to alleviate problems on a construction jobsite and reduce the time and cost of solving problems related to constructability. This paper proposes a new methodology for the sharing of construction knowledge by using Building Information Modeling (BIM) technology. The main characteristics of BIM include illustrating 3D CAD-based presentations and keeping information in a digital format and facilitation of easy updating and transfer of information in the BIM environment. Using the BIM technology, project managers and engineers can gain knowledge related to BIM and obtain feedback provided by jobsite engineers for future reference. This study addresses the application of knowledge sharing management using BIM technology and proposes a BIM-based Knowledge Sharing Management (BIMKSM) system for project managers and engineers. The BIMKSM system is then applied in a selected case study of a construction project in Taiwan to demonstrate the effectiveness of sharing knowledge in the BIM environment. The results demonstrate that the BIMKSM system can be used as a visual BIM-based knowledge sharing management platform by utilizing the BIM technology. PMID:24723790
Enhancing knowledge sharing management using BIM technology in construction.
Ho, Shih-Ping; Tserng, Hui-Ping; Jan, Shu-Hui
2013-01-01
Construction knowledge can be communicated and reused among project managers and jobsite engineers to alleviate problems on a construction jobsite and reduce the time and cost of solving problems related to constructability. This paper proposes a new methodology for the sharing of construction knowledge by using Building Information Modeling (BIM) technology. The main characteristics of BIM include illustrating 3D CAD-based presentations and keeping information in a digital format and facilitation of easy updating and transfer of information in the BIM environment. Using the BIM technology, project managers and engineers can gain knowledge related to BIM and obtain feedback provided by jobsite engineers for future reference. This study addresses the application of knowledge sharing management using BIM technology and proposes a BIM-based Knowledge Sharing Management (BIMKSM) system for project managers and engineers. The BIMKSM system is then applied in a selected case study of a construction project in Taiwan to demonstrate the effectiveness of sharing knowledge in the BIM environment. The results demonstrate that the BIMKSM system can be used as a visual BIM-based knowledge sharing management platform by utilizing the BIM technology.
48 CFR 31.201-7 - Construction and architect-engineer contracts.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-engineer contracts. 31.201-7 Section 31.201-7 Federal Acquisition Regulations System FEDERAL ACQUISITION... Organizations 31.201-7 Construction and architect-engineer contracts. Specific principles and procedures for... architect-engineer contracts related to construction projects, are in 31.105. The applicability of these...
48 CFR 31.201-7 - Construction and architect-engineer contracts.
Code of Federal Regulations, 2012 CFR
2012-10-01
...-engineer contracts. 31.201-7 Section 31.201-7 Federal Acquisition Regulations System FEDERAL ACQUISITION... Organizations 31.201-7 Construction and architect-engineer contracts. Specific principles and procedures for... architect-engineer contracts related to construction projects, are in 31.105. The applicability of these...
48 CFR 31.201-7 - Construction and architect-engineer contracts.
Code of Federal Regulations, 2014 CFR
2014-10-01
...-engineer contracts. 31.201-7 Section 31.201-7 Federal Acquisition Regulations System FEDERAL ACQUISITION... Organizations 31.201-7 Construction and architect-engineer contracts. Specific principles and procedures for... architect-engineer contracts related to construction projects, are in 31.105. The applicability of these...
48 CFR 31.201-7 - Construction and architect-engineer contracts.
Code of Federal Regulations, 2013 CFR
2013-10-01
...-engineer contracts. 31.201-7 Section 31.201-7 Federal Acquisition Regulations System FEDERAL ACQUISITION... Organizations 31.201-7 Construction and architect-engineer contracts. Specific principles and procedures for... architect-engineer contracts related to construction projects, are in 31.105. The applicability of these...
48 CFR 31.201-7 - Construction and architect-engineer contracts.
Code of Federal Regulations, 2011 CFR
2011-10-01
...-engineer contracts. 31.201-7 Section 31.201-7 Federal Acquisition Regulations System FEDERAL ACQUISITION... Organizations 31.201-7 Construction and architect-engineer contracts. Specific principles and procedures for... architect-engineer contracts related to construction projects, are in 31.105. The applicability of these...
2012-09-20
CAPE CANAVERAL, Fla. -- At NASA’s Kennedy Space Center in Florida, a groundbreaking was held to mark the start of construction on the Antenna Test Bed Array for the Ka-Band Objects Observation and Monitoring, or Ka-BOOM system. Using ceremonial shovels to mark the site, from left are Michael Le, lead design engineer and construction manager Sue Vingris, Cape Design Engineer Co. project manager Kannan Rengarajan, chief executive officer of Cape Design Engineer Co. Lutfi Mized, president of Cape Design Engineer Co. David Roelandt, construction site superintendent with Cape Design Engineer Co. Marc Seibert, NASA project manager Michael Miller, NASA project manager Peter Aragona, KSC’s Electromagnetic Lab manager Stacy Hopper, KSCs master planning supervisor Dr. Bary Geldzabler, NASA chief scientist and KSC’s Chief Technologist Karen Thompson. The construction site is near the former Vertical Processing Facility, which has been demolished. Workers will begin construction on the pile foundations for the 40-foot-diameter dish antenna arrays and their associated utilities, and prepare the site for the operations command center facility. Photo credit: NASA/Charisse Nahser
2012-09-20
CAPE CANAVERAL, Fla. -- At NASA’s Kennedy Space Center in Florida, a groundbreaking was held to mark the start of construction on the Antenna Test Bed Array for the Ka-Band Objects Observation and Monitoring, or Ka-BOOM system. Holding ceremonial shovels, from left are Michael Le, lead design engineer and construction manager Sue Vingris, Cape Design Engineer Co. project manager Kannan Rengarajan, chief executive officer of Cape Design Engineer Co. Lutfi Mized, president of Cape Design Engineer Co. David Roelandt, construction site superintendent with Cape Design Engineer Co. Marc Seibert, NASA project manager Michael Miller, NASA project manager Peter Aragona, KSC’s Electromagnetic Lab manager Stacy Hopper, KSCs master planning supervisor Dr. Bary Geldzabler, NASA chief scientist and KSC’s Chief Technologist Karen Thompson. The construction site is near the former Vertical Processing Facility, which has been demolished. Workers will begin construction on the pile foundations for the 40-foot-diameter dish antenna arrays and their associated utilities, and prepare the site for the operations command center facility. Photo credit: NASA/Charisse Nahser
NASA Technical Reports Server (NTRS)
1991-01-01
The Center for Space Construction at the University of Colorado at Boulder was established in 1988 as a University Space Engineering Research Center. The mission of the Center is to conduct interdisciplinary engineering research which is critical to the construction of future space structures and systems and to educate students who will have the vision and technical skills to successfully lead future space construction activities. The research activities are currently organized around two central projects: Orbital Construction and Lunar Construction. Summaries of the research projects are included.
W. H. Reid; D. B. McKeever
Estimates of the amounts of wood products used in constructing civil conservation and development projects by the Corps of Engineers in the United States are presented for the years 1962 and 1978. Amounts of lumber, laminated lumber, poles and piling, and plywood used in construction are stratified by five construction categories, and three types of uses. Estimates of...
Using Project Management Systems at the Construction Field Office
1989-03-01
instrumentation 13550 transportation control instrumentation 13600 solor energy systems 13700 wind energy systems 13800 building automation systems ...Engineering Research Laboratory AD-A207 077 Using Project Management Systems at the Construction Field Office by E. William East Jeffrey G. Kirby Automated...automated systems available, engineers at the construction fieid office (or resident office) are faced with the over- whelming task of choosing which
Constructability issues on KyTC projects.
DOT National Transportation Integrated Search
2003-07-01
A successful constructibility review process for a transportation agency must follow an established methodology similar to value engineering. The process must be flexible and address the critical issues impacting transportation construction projects,...
Code of Federal Regulations, 2014 CFR
2014-04-01
... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS VALUE ENGINEERING... construction. Value Engineering (VE) analysis. The systematic process of reviewing and assessing a project by a...; and (3) Reducing the time to develop and deliver the project. Value Engineering (VE) Job Plan. A...
Code of Federal Regulations, 2013 CFR
2013-04-01
... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS VALUE ENGINEERING... construction. Value Engineering (VE) analysis. The systematic process of reviewing and assessing a project by a...; and (3) Reducing the time to develop and deliver the project. Value Engineering (VE) Job Plan. A...
Challenges in Construction Over Soft Soil - Case Studies in Malaysia
NASA Astrophysics Data System (ADS)
Mohamad, N. O.; Razali, C. E.; Hadi, A. A. A.; Som, P. P.; Eng, B. C.; Rusli, M. B.; Mohamad, F. R.
2016-07-01
Construction on soft ground area is a great challenge in the field of geotechnical engineering. Many engineering problems in the form of slope instability, bearing capacity failure or excessive settlement could occur either during or after the construction phase due to low shear strength and high compressibility of this soil. As main technical agencies responsible for implementation of development projects for Government of Malaysia, Public Works Department has vast experience in dealing with this problematic soil over the years. This paper discussed and elaborate on the engineering problems encountered in construction projects that have been carried out by PWD, namely Core Facilities Building of Polytechnic Kota Kinabalu in Sabah and Hospital Tengku Ampuan Rahimah Integration Quarters in Klang, Selangor. Instability of the ground during construction works had caused delay and cost overrun in completion of the project in Selangor, whereas occurrence of continuous post construction settlement had affected the integrity and serviceability of the building in Sabah. The causes of failure and proposed rehabilitation work for both projects also will be discussed in brief.
Urban construction and safety project
NASA Technical Reports Server (NTRS)
Hogarth, P. T.
1976-01-01
Technology utilization projects in the area of urban construction and safety included the following: development of undercarpet and baseboard flat conductor cables, flood insurance studies, tornado safety engineering, the Project TECH house at the Langley Research Center, assistance to the City of Atlanta in their environmental habitability and resource allocation program, and market assessment of a solid state diesel engine controller. The flat conductor cable and the flood insurance studies are given particular attention.
Ranking the Project Management Success Factors for Construction Project in South India
NASA Astrophysics Data System (ADS)
Aneesha, K.; Haridharan, M. K.
2017-07-01
In Today’s construction industry, to achieve a greater advantage over the firms, success of each project and efficiency is required. Effective Project Management overcomes these types of challenges. This study identifies the success factors which are important for project management in construction project success. From the literature review, 26 factors were found to be critical. Project managers, construction managers, civil engineers, contractors and site engineers were the respondents. After analyzing the data in SPSS software, the dominant factors from the regression analysis are top management support, competent project team, abilities to solve problems, realistic cost and time estimates, information/communication, competency of the project manager are the 6 factors out of 12 in 26 factors. Effective communication between stakeholders got highest priority and client involvement, good leadership, clarity of project goals got second priority. Informal communication gives better results compared to formal communications like written formats. To remove communication barrier with the stakeholders, informal communication like speaking face-to-face with the language this fits for the stakeholders.
2016-12-01
Nonfederal Sponsors Why GAO Did This Study Through its Civil Works program, the Corps designs , constructs, and maintains federal water resources...Public Works United States Senate Dear Mr. Chairman: The U.S. Army Corps of Engineers (Corps) is the world’s largest public engineering, design ...its Civil Works Program, in general, the Corps plans, designs , constructs, operates, and maintains a wide range of water resources projects. Congress
Code of Federal Regulations, 2013 CFR
2013-10-01
... customarily be capitalized as Vessel or Shipyard Project construction costs such as designing, engineering...) Cost items include those items usually specified in Vessel or Shipyard Project construction contracts... fees and interest on the Obligations or other borrowings incurred during the construction period...
Code of Federal Regulations, 2012 CFR
2012-10-01
... customarily be capitalized as Vessel or Shipyard Project construction costs such as designing, engineering...) Cost items include those items usually specified in Vessel or Shipyard Project construction contracts... fees and interest on the Obligations or other borrowings incurred during the construction period...
Code of Federal Regulations, 2014 CFR
2014-10-01
... customarily be capitalized as Vessel or Shipyard Project construction costs such as designing, engineering...) Cost items include those items usually specified in Vessel or Shipyard Project construction contracts... fees and interest on the Obligations or other borrowings incurred during the construction period...
8. Historic photo taken during construction of the Lost River ...
8. Historic photo taken during construction of the Lost River Diversion Dam and House. Labeled as follows, 'View showing walk construction North side. Group in foreground, left to right: - J.M. McLean, I.S. Voorhees, Asst Eng'r, A.B. Clevland, engineer... W.W. Patch, Project Engineer.' Negative # 95. Facing east. - Klamath Basin Project, Lost River Diversion Dam House, Lost River near intersection of State Highway 140 & Hill Road, Klamath Falls, Klamath County, OR
Distinction of Concept and Discussion on Construction Idea of Smart Water Grid Project
NASA Astrophysics Data System (ADS)
Ye, Y.; Yizi, S., Sr.; Lili, L., Sr.; Sang, X.; Zhai, J.
2016-12-01
Smart water grid project includes construction of water physical grid consisting of various flow regulating infrastructures, construction of water information grid in line with the trend of intelligent technology and construction of water management grid featured by system & mechanism construction and systemization of regulation decision-making. It is the integrated platform and comprehensive carrier for water conservancy practices. Currently, there still is dispute over engineering construction idea of smart water grid which, however, represents the future development trend of water management and is increasingly emphasized. The paper, based on distinction of concept of water grid and water grid engineering, explains the concept of water grid intelligentization, actively probes into construction idea of Smart water grid project in our country and presents scientific problems to be solved as well as core technologies to be mastered for smart water grid construction.
Predicting on-site environmental impacts of municipal engineering works
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gangolells, Marta, E-mail: marta.gangolells@upc.edu; Casals, Miquel, E-mail: miquel.casals@upc.edu; Forcada, Núria, E-mail: nuria.forcada@upc.edu
2014-01-15
The research findings fill a gap in the body of knowledge by presenting an effective way to evaluate the significance of on-site environmental impacts of municipal engineering works prior to the construction stage. First, 42 on-site environmental impacts of municipal engineering works were identified by means of a process-oriented approach. Then, 46 indicators and their corresponding significance limits were determined on the basis of a statistical analysis of 25 new-build and remodelling municipal engineering projects. In order to ensure the objectivity of the assessment process, direct and indirect indicators were always based on quantitative data from the municipal engineering projectmore » documents. Finally, two case studies were analysed and found to illustrate the practical use of the proposed model. The model highlights the significant environmental impacts of a particular municipal engineering project prior to the construction stage. Consequently, preventive actions can be planned and implemented during on-site activities. The results of the model also allow a comparison of proposed municipal engineering projects and alternatives with respect to the overall on-site environmental impact and the absolute importance of a particular environmental aspect. These findings are useful within the framework of the environmental impact assessment process, as they help to improve the identification and evaluation of on-site environmental aspects of municipal engineering works. The findings may also be of use to construction companies that are willing to implement an environmental management system or simply wish to improve on-site environmental performance in municipal engineering projects. -- Highlights: • We present a model to predict the environmental impacts of municipal engineering works. • It highlights significant on-site environmental impacts prior to the construction stage. • Findings are useful within the environmental impact assessment process. • They also help contractors to implement environmental management systems.« less
Code of Federal Regulations, 2010 CFR
2010-04-01
... UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Construction § 900.122 What does an... information available about the construction project, including construction drawings, maps, engineering... tribal organization to review all plans, specifications, engineering reports, cost estimates, and other...
NASA Astrophysics Data System (ADS)
Latiffi, A. Ahmad; Brahim, J.; Fathi, M. S.
2017-08-01
Building Information Modelling (BIM) concept has expanded widely in many countries for more than a decade with its role of improving current practices in construction projects. However, the understanding of BIM differs among construction players, depending on how construction players utilize the concept in their projects. Therefore, this paper aims to explore the understanding of BIM concept among construction players in the Malaysian construction industry. A literature review on BIM concept and semi-structured interviews with construction players in BIM such as client, civil and structural (C&S) engineer and mechanical and electrical (M&E) engineer, quantity surveyor (QS), contractor, facilities manager and BIM consultant have been conducted in order to achieve this study’s the aim. The results show that the understanding of BIM concept among the construction players is limited to BIM as a process and technology. It is important for the construction players to improve their understanding of BIM as it can be used to enhance performance and productivity of construction projects.
A Knowledge Engineering Approach to Analysis and Evaluation of Construction Schedules
1990-02-01
software engineering discipline focusing on constructing KBSs. It is an incremental and cyclical process that requires the interaction of a domain expert(s...the U.S. Army Coips of Engineers ; and (3) the project management software developer, represented by Pinnell Engineering , Inc. Since the primary...the programming skills necessary to convert the raw knowledge intn a form a computer can understand. knowledge engineering : The software engineering
Compendium of Administrators of Land Use and Related Programs. Revision
1982-09-01
construction engineering research laboratory Army Nation Unitad Stoic«» Army ^ n * Technical Report N-40 (Revised) September 19 82...CONTRACT OR GRANT NUMBER’«) \\ 9. PERFORMING ORGANIZATION NAME AND ADDRESS U.S. ARMY CONSTRUCTION ENGINEERING RESEARCH LABORATORY...Chief of Engineers (OCE), under Project 4A762720A896, "Environmental Quality for Construction and Operation of Military Facilities" Task 04. "Land Use
The application of micro UAV in construction project
NASA Astrophysics Data System (ADS)
Kaamin, Masiri; Razali, Siti Nooraiin Mohd; Ahmad, Nor Farah Atiqah; Bukari, Saifullizan Mohd; Ngadiman, Norhayati; Kadir, Aslila Abd; Hamid, Nor Baizura
2017-10-01
In every outstanding construction project, there is definitely have an effective construction management. Construction management allows a construction project to be implemented according to plan. Every construction project must have a progress development works that is usually created by the site engineer. Documenting the progress of works is one of the requirements in construction management. In a progress report it is necessarily have a visual image as an evidence. The conventional method used for photographing on the construction site is by using common digital camera which is has few setback comparing to Micro Unmanned Aerial Vehicles (UAV). Besides, site engineer always have a current issues involving limitation of monitoring on high reach point and entire view of the construction site. The purpose of this paper is to provide a concise review of Micro UAV technology in monitoring the progress on construction site through visualization approach. The aims of this study are to replace the conventional method of photographing on construction site using Micro UAV which can portray the whole view of the building, especially on high reach point and allows to produce better images, videos and 3D model and also facilitating site engineer to monitor works in progress. The Micro UAV was flown around the building construction according to the Ground Control Points (GCPs) to capture images and record videos. The images taken from Micro UAV have been processed generate 3D model and were analysed to visualize the building construction as well as monitoring the construction progress work and provides immediate reliable data for project estimation. It has been proven that by using Micro UAV, a better images and videos can give a better overview of the construction site and monitor any defects on high reach point building structures. Not to be forgotten, with Micro UAV the construction site progress is more efficiently tracked and kept on the schedule.
ERIC Educational Resources Information Center
Haigh, Sarah; Bell, Christopher; Ruta, Chris
2017-01-01
This article provides details of a successful educational engineering project run in partnership between a group of ten schools and an international engineering, construction and technical services company. It covers the history and evolution of the project and highlights how the project has significant impact not only on the students involved but…
10 CFR 609.12 - Project Costs.
Code of Federal Regulations, 2011 CFR
2011-01-01
... incurred in the design, engineering, financing, construction, startup, commissioning and shakedown of the... rental of real property, including engineering fees, surveys, title insurance, recording fees, and legal... transportation for facility design, construction, startup, commissioning and shakedown; (3) Costs of equipment...
10 CFR 609.12 - Project Costs.
Code of Federal Regulations, 2012 CFR
2012-01-01
... incurred in the design, engineering, financing, construction, startup, commissioning and shakedown of the... rental of real property, including engineering fees, surveys, title insurance, recording fees, and legal... transportation for facility design, construction, startup, commissioning and shakedown; (3) Costs of equipment...
10 CFR 609.12 - Project Costs.
Code of Federal Regulations, 2013 CFR
2013-01-01
... incurred in the design, engineering, financing, construction, startup, commissioning and shakedown of the... rental of real property, including engineering fees, surveys, title insurance, recording fees, and legal... transportation for facility design, construction, startup, commissioning and shakedown; (3) Costs of equipment...
10 CFR 609.12 - Project Costs.
Code of Federal Regulations, 2010 CFR
2010-01-01
... incurred in the design, engineering, financing, construction, startup, commissioning and shakedown of the... rental of real property, including engineering fees, surveys, title insurance, recording fees, and legal... transportation for facility design, construction, startup, commissioning and shakedown; (3) Costs of equipment...
10 CFR 609.12 - Project Costs.
Code of Federal Regulations, 2014 CFR
2014-01-01
... incurred in the design, engineering, financing, construction, startup, commissioning and shakedown of the... rental of real property, including engineering fees, surveys, title insurance, recording fees, and legal... transportation for facility design, construction, startup, commissioning and shakedown; (3) Costs of equipment...
NASA Astrophysics Data System (ADS)
Laughton, C.
2008-12-01
For the last half century the physics community has increasingly turned to the use of underground space to conduct basic research. The community is currently planning to conduct a new generation of underground experiments at the Deep Underground Science and Engineering Laboratory (DUSEL). DUSEL will be constructed within the footprint of the defunct Homestake Gold Mine, located in Lead, South Dakota. Physics proposals call for the construction of new caverns in which to conduct major new experiments. Some of the proposed laboratory facilities will be significantly larger and deeper than any previously constructed. The talk will highlight possible opportunities for integrating multi-disciplinary research in to the cavern construction program, and will stress the need to work closely with design and construction contractors to ensure that research goals can be achieve with minimal impact on project work. The constructors of large caverns should be particularly receptive to, and encouraging of geoscience research that could improve the engineering characterization of the rock mass. An improved understanding of the rock mass, as the host construction material, would result in a more reliable cavern design and construction process, and a reduced construction risk to the Project.
Design Guide for Selection and Specification of Kevlar Rope for Ocean Engineering and Construction.
1976-07-01
public rtoieco cnd sol . It i Idim .buttm Is ul"rnimi.. OCEAN ENGINEERING AND CONSTRUCTION PROJECT OFFICE CHESAPEAKE DIVISION NAVAL FACILITIES ENGINEERING...be to have no more than one layer. This is impractical for oceano - graphic purposes. Assuming a need to spooi many layers of rope under tension
Building information models for astronomy projects
NASA Astrophysics Data System (ADS)
Ariño, Javier; Murga, Gaizka; Campo, Ramón; Eletxigerra, Iñigo; Ampuero, Pedro
2012-09-01
A Building Information Model is a digital representation of physical and functional characteristics of a building. BIMs represent the geometrical characteristics of the Building, but also properties like bills of quantities, definition of COTS components, status of material in the different stages of the project, project economic data, etc. The BIM methodology, which is well established in the Architecture Engineering and Construction (AEC) domain for conventional buildings, has been brought one step forward in its application for Astronomical/Scientific facilities. In these facilities steel/concrete structures have high dynamic and seismic requirements, M&E installations are complex and there is a large amount of special equipment and mechanisms involved as a fundamental part of the facility. The detail design definition is typically implemented by different design teams in specialized design software packages. In order to allow the coordinated work of different engineering teams, the overall model, and its associated engineering database, is progressively integrated using a coordination and roaming software which can be used before starting construction phase for checking interferences, planning the construction sequence, studying maintenance operation, reporting to the project office, etc. This integrated design & construction approach will allow to efficiently plan construction sequence (4D). This is a powerful tool to study and analyze in detail alternative construction sequences and ideally coordinate the work of different construction teams. In addition engineering, construction and operational database can be linked to the virtual model (6D), what gives to the end users a invaluable tool for the lifecycle management, as all the facility information can be easily accessed, added or replaced. This paper presents the BIM methodology as implemented by IDOM with the E-ELT and ATST Enclosures as application examples.
1980-02-01
Safety Inspection of Dams" are not available. These studies should be performed by a professional engineer experienced in the design and construction...engineer experienced in the design and construction of tailings dams. An inspection and maintenance program should be initiated. Periodic inspections...Page No. SECTION 1 - PROJECT INFORMATION 1.1 General 1 1.2 Description of Project 1 1.3 Pertinent Data 2 SECTION 2 - ENGINEERING DATA 2.1 Design 5 2.2
Field trial of gravel stabilization methods : Route 1, Cyr-Van Buren, ME : 2nd interim report.
DOT National Transportation Integrated Search
1995-02-01
This experimental construction project was developed, designed, and inspected by personnel from the University of Maine, Civil Engineering Staff. The experimental project was constructed on and as a part of Project #2586 00. This was a complete recon...
Field trial of gravel stabilization methods : Route 1, Cyr-Van Buren, ME : 1st interim report.
DOT National Transportation Integrated Search
1993-05-01
This experimental construction project was developed, designed, and inspected by personnel from the University of Maine, Civil Engineering Staff. The experimental project was constructed on and as a part of Project #2586.00. This was a complete recon...
Construction Site Environmental Impact in Civil Engineering Education
ERIC Educational Resources Information Center
Teixeira, Jose M. Cardoso
2005-01-01
The environmental impact of construction activity has gained increasing importance in the last few years and become a key subject for civil engineering education. A survey of Portuguese higher education institutions shows that concern with this topic is mostly directed at the impact of large construction projects and especially focused on their…
Physics at the International Science and Engineering Fair.
ERIC Educational Resources Information Center
Walker, Jearl
1979-01-01
A judge for the physics projects for the 1979 International Science and Engineering Fair describes many of the more popular science projects. Projects described include the following: carbon dioxide and helium-neon lasers, reverse flame investigations, holography, construction of a magnetic bottle to confine plasma, and aerodynamic drag. (BT)
Code of Federal Regulations, 2014 CFR
2014-01-01
... imposed by construction, equipment, material or service contracts, penalty payments, damage claims, awards... consultants with suitable experience, training and professional competence in the design and construction of... engineering services for design and construction inspection for all project facilities. Resident inspection by...
Code of Federal Regulations, 2011 CFR
2011-01-01
... imposed by construction, equipment, material or service contracts, penalty payments, damage claims, awards... consultants with suitable experience, training and professional competence in the design and construction of... engineering services for design and construction inspection for all project facilities. Resident inspection by...
Review of NASA's Hypersonic Research Engine Project
NASA Technical Reports Server (NTRS)
Andrews, Earl H.; Mackley, Ernest A.
1993-01-01
The goals of the NASA Hypersonic Research Engine (HRE) Project, which began in 1964, were to design, develop, and construct a hypersonic research ramjet/scramjet engine for high performance and to flight-test the developed concept over the speed range from Mach 3 to 8. The project was planned to be accomplished in three phases: project definition, research engine development, and flight test using the X-15A-2 research aircraft, which was modified to carry hydrogen fuel for the research engine. The project goal of an engine flight test was eliminated when the X-15 program was canceled in 1968. Ground tests of engine models then became the focus of the project. Two axisymmetric full-scale engine models having 18-inch-diameter cowls were fabricated and tested: a structural model and a combustion/propulsion model. A brief historical review of the project with salient features, typical data results, and lessons learned is presented.
Bai, Xiao-ping; Zhang, Xi-wei
2013-01-01
Selecting construction schemes of the building engineering project is a complex multiobjective optimization decision process, in which many indexes need to be selected to find the optimum scheme. Aiming at this problem, this paper selects cost, progress, quality, and safety as the four first-order evaluation indexes, uses the quantitative method for the cost index, uses integrated qualitative and quantitative methodologies for progress, quality, and safety indexes, and integrates engineering economics, reliability theories, and information entropy theory to present a new evaluation method for building construction project. Combined with a practical case, this paper also presents detailed computing processes and steps, including selecting all order indexes, establishing the index matrix, computing score values of all order indexes, computing the synthesis score, sorting all selected schemes, and making analysis and decision. Presented method can offer valuable references for risk computing of building construction projects.
NASA Astrophysics Data System (ADS)
Sugandi, Machmud
2017-09-01
Implementation of the Prakerin subject in the field of Building Engineering study program in vocational high school (VHS) are facing many issues associated to non-compliance unit of work in the industry and the expected competencies in learning at school. Project Based Learning (PBL) is an appropriate model learning used for Prakerin subject to increase student competence as the extension of the Prakerin implementation in the construction industry services. Assignments based on the selected project during their practical industry work were given to be completed by student. VHS students in particular field of Building Engineering study program who has been completed Prakerin subject will have a better job readiness, and therefore they will have an understanding on the knowledge, skills, and attitudes and good vision on the construction project in accordance with their experience during Prakerin work in the industry.
ERIC Educational Resources Information Center
Department of Health , Education, and Welfare, Washington., DC. Office of the Secretary.
This handbook provides a basis for consideration of acceptable approaches which are available and may be used to initiate the use of construction management services in the planning, design, and construction of federally assisted construction projects. It includes the mandatory federal requirements as well as acceptable procedures for selecting…
The TAME Project: Towards improvement-oriented software environments
NASA Technical Reports Server (NTRS)
Basili, Victor R.; Rombach, H. Dieter
1988-01-01
Experience from a dozen years of analyzing software engineering processes and products is summarized as a set of software engineering and measurement principles that argue for software engineering process models that integrate sound planning and analysis into the construction process. In the TAME (Tailoring A Measurement Environment) project at the University of Maryland, such an improvement-oriented software engineering process model was developed that uses the goal/question/metric paradigm to integrate the constructive and analytic aspects of software development. The model provides a mechanism for formalizing the characterization and planning tasks, controlling and improving projects based on quantitative analysis, learning in a deeper and more systematic way about the software process and product, and feeding the appropriate experience back into the current and future projects. The TAME system is an instantiation of the TAME software engineering process model as an ISEE (integrated software engineering environment). The first in a series of TAME system prototypes has been developed. An assessment of experience with this first limited prototype is presented including a reassessment of its initial architecture.
Construction Sector (NAICS 23)
Find environmental regulatory information for the construction sector, including the construction of buildings or engineering projects. This includes RCRA information for hazardous waste, refrigeration compliance, asbestos, effluent guidelines & lead laws
ERIC Educational Resources Information Center
Suwal, Sunil; Singh, Vishal
2018-01-01
Building Information Modelling (BIM) tools and processes are increasingly adopted and implemented in the construction industry. Consequently, BIM education is considered increasingly important in Architecture, Engineering and Construction (AEC) education. While most of the research and literature on BIM education in engineering studies has focused…
National Science Foundation 1989 Engineering Senior Design Projects To Aid the Disabled.
ERIC Educational Resources Information Center
Enderle, John D., Ed.
Through the Bioengineering and Research to Aid the Disabled program of the National Science Foundation, design projects were awarded competitively to 16 universities. Senior engineering students at each of the universities constructed custom devices and software for disabled individuals. This compendium contains a description of each project in…
1987-09-01
folder . 4. Reviewing design documents and supervises project if designed by other than RED HORSE. 5. Chairing design conferences. 6. Coordinating design...project folder . Air Force Regulation 93-9 requires the project manager to maintain the following records: A. Approved project programming documents. B...these records are maintained in the project folder . Depending on the current status of the project, the project folder will be available from either the
Construction Project Management for RED HORSE Troop Training Projects
1989-02-02
estimating, scheduling, and cost control required for project management decision making in RED HORSE construction projects. The expected benefits of...After receiving tentative approval for a project, either the benefiting base engineering section or the appropriate RED HORSE squadron executes the...approved by the benefiting base commander and forwarded to RED HORSE for review. Once the design has started, the benefiting base reports to Headquarters
NASA's Hypersonic Research Engine Project: A review
NASA Technical Reports Server (NTRS)
Andrews, Earl H.; Mackley, Ernest A.
1994-01-01
The goals of the NASA Hypersonic Research Engine (HRE) Project, which began in 1964, were to design, develop, and construct a high-performance hypersonic research ramjet/scramjet engine for flight tests of the developed concept over the speed range of Mach 4 to 8. The project was planned to be accomplished in three phases: project definition, research engine development, and flight test using the X-15A-2 research airplane, which was modified to carry hydrogen fuel for the research engine. The project goal of an engine flight test was eliminated when the X-15 program was canceled in 1968. Ground tests of full-scale engine models then became the focus of the project. Two axisymmetric full-scale engine models, having 18-inch-diameter cowls, were fabricated and tested: a structural model and combustion/propulsion model. A brief historical review of the project, with salient features, typical data results, and lessons learned, is presented. An extensive number of documents were generated during the HRE Project and are listed.
NEARING THE END OF CONSTRUCTION ON THE LOX TEST STAND AT MSFC.
2015-01-08
AS THE END OF CONSTRUCTION ON TEST STAND 4697, THE LIQUID OXYGEN TANK TEST STAND AT MARSHALL SPACE FLIGHT CENTER, PROJECT ENGINEERS PHIL HENDRIX, FROM MSFC, AND CURTNEY WALTERS FROM THE U.S. CORP OF ENGINEERS, STUDY PLANS AND PROGRESS.
ERIC Educational Resources Information Center
Cowin, Roy; Reyes-Guerra, David
1977-01-01
Engineers may be involved in various functions such as research, development, planning, design (analysis and synthesis), construction, operation and management of engineering projects. This article discusses some branches of accredited engineering curricula, employment opportunities, the preparation for management, minimum education needed, women…
NASA Astrophysics Data System (ADS)
Zhu, Boqin
2015-08-01
The purpose of using unmanned aerial vehicle (UAV) remote sensing application in Five-hundred-meter aperture spherical telescope (FAST) project is to dynamically record the construction process with high resolution image, monitor the environmental impact, and provide services for local environmental protection and the reserve immigrants. This paper introduces the use of UAV remote sensing system and the course design and implementation for the FAST site. Through the analysis of the time series data, we found that: (1) since the year 2012, the project has been widely carried out; (2) till 2013, the internal project begun to take shape;(3) engineering excavation scope was kept stable in 2014, and the initial scale of the FAST engineering construction has emerged as in the meantime, the vegetation recovery went well on the bare soil area; (4) in 2015, none environmental problems caused by engineering construction and other engineering geological disaster were found in the work area through the image interpretation of UAV images. This paper also suggested that the UAV technology need some improvements to fulfill the requirements of surveying and mapping specification., including a new data acquisition and processing measures assigned with the background of highly diverse elevation, usage of telephoto camera, hierarchical photography with different flying height, and adjustment with terrain using the joint empty three settlement method.
Try This: Construct a Water Catchment
ERIC Educational Resources Information Center
Teaching Science, 2017
2017-01-01
EngQuest, an initiative of Engineers Australia, provides an exciting, non-competitive way for students to participate in free, fun and educational engineering activities involving mathematics, science and technology. This article describes a project designed to teach middle school students how to construct a water catchment system. Water…
Enabling Geotechnical Data for Broader Use by the Spatial Data Infrastructures
ERIC Educational Resources Information Center
Zand, Amir Ghasem
2011-01-01
Geotechnical data are one of the most prevalent data types in civil engineering projects. The majority of the civil engineering projects that are in use today are designed using site-specific geotechnical data. The usage of geotechnical data is not limited to construction projects. This data is used in a wide range of applications, including…
NASA advanced design program. Design and analysis of a radio-controlled flying wing aircraft
NASA Technical Reports Server (NTRS)
1993-01-01
The main challenge of this project was to design an aircraft that will achieve stability while flying without a horizontal tail. The project focused on both the design, analysis and construction of a remotely piloted, elliptical shaped flying wing. The design team was composed of four sub-groups each of which dealt with the different aspects of the design, namely aerodynamics, stability and control, propulsion, and structures. Each member of the team initially researched the background information pertaining to specific facets of the project. Since previous work on this topic was limited, most of the focus of the project was directed towards developing an understanding of the natural instability of the aircraft. Once the design team entered the conceptual stage of the project, a series of compromises had to be made to satisfy the unique requirements of each sub-group. As a result of the numerous calculations and iterations necessary, computers were utilized extensively. In order to visualize the design and layout of the wing, engines and control surfaces, a solid modeling package was used to evaluate optimum design placements. When the design was finalized, construction began with the help of all the members of the project team. The nature of the carbon composite construction process demanded long hours of manual labor. The assembly of the engine systems also required precision hand work. The final product of this project is the Elang, a one-of-a-kind remotely piloted aircraft of composite construction powered by two ducted fan engines.
Two-stage commercial evaluation of engineering systems production projects for high-rise buildings
NASA Astrophysics Data System (ADS)
Bril, Aleksander; Kalinina, Olga; Levina, Anastasia
2018-03-01
The paper is devoted to the current and debatable problem of methodology of choosing the effective innovative enterprises for venture financing. A two-stage system of commercial innovation evaluation based on the UNIDO methodology is proposed. Engineering systems account for 25 to 40% of the cost of high-rise residential buildings. This proportion increases with the use of new construction technologies. Analysis of the construction market in Russia showed that the production of internal engineering systems elements based on innovative technologies has a growth trend. The production of simple elements is organized in small enterprises on the basis of new technologies. The most attractive for development is the use of venture financing of small innovative business. To improve the efficiency of these operations, the paper proposes a methodology for a two-stage evaluation of small business development projects. A two-stage system of commercial evaluation of innovative projects allows creating an information base for informed and coordinated decision-making on venture financing of enterprises that produce engineering systems elements for the construction business.
A Center for Extraterrestrial Engineering and Construction (CETEC)
NASA Technical Reports Server (NTRS)
Leigh, Gerald G.
1992-01-01
A group of knowledgeable scientists and engineers in New Mexico has recognized the need for such a testing capability and has proposed a project to evelop an extraterrestrial surface simulation facility. A group of universities, national laboratories, and private industrial firms is proposing to establish a Center for Extraterrestrial Engineering and Construction (CETEC) and to develop large extraterrestrial surface simulation facilities in which this needed testing can be realistically performed. The CETEC is envisioned to be both a center of knowledge and data regarding engineering, construction, mining, and material process operations on extraterrestrial bodies and a set of extraterrestrial surface simulation facilities. The primary CETEC facility is proposed to be a large domed building made of steel reinforced concrete with more than one acre of test floor area covered with several feet of simulated lunar soil and dust. Various aspects of the project are presented in viewgraph form.
Forecasting Construction Cost Index based on visibility graph: A network approach
NASA Astrophysics Data System (ADS)
Zhang, Rong; Ashuri, Baabak; Shyr, Yu; Deng, Yong
2018-03-01
Engineering News-Record (ENR), a professional magazine in the field of global construction engineering, publishes Construction Cost Index (CCI) every month. Cost estimators and contractors assess projects, arrange budgets and prepare bids by forecasting CCI. However, fluctuations and uncertainties of CCI cause irrational estimations now and then. This paper aims at achieving more accurate predictions of CCI based on a network approach in which time series is firstly converted into a visibility graph and future values are forecasted relied on link prediction. According to the experimental results, the proposed method shows satisfactory performance since the error measures are acceptable. Compared with other methods, the proposed method is easier to implement and is able to forecast CCI with less errors. It is convinced that the proposed method is efficient to provide considerably accurate CCI predictions, which will make contributions to the construction engineering by assisting individuals and organizations in reducing costs and making project schedules.
Learning Based on the Project Entitled "Design and Construction of a Wooden Bridge"
ERIC Educational Resources Information Center
Barris, Cristina; Torres, Lluís; Simon, Enric
2016-01-01
This article presents the results of a case involving the application of project-based learning carried out with students in the Mechanical Engineering degree program at the University of Girona. The project, entitled "Design and construction of a wooden bridge", was conducted at the Polytechnic School in the third-year Structures…
How to renovate a 50-year-old wastewater treating plant: Part 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hunter, M.L.
1996-01-01
How does an existing refinery cost-effectively renovate wastewater/stormwater treating systems to meet today`s environmental regulations and standards? Faced with solving this problem, Amoco`s Whiting Refinery developed a project team consisting of plant and operations engineers, corporate project and design engineers, contractors and vendors to map out a strategy to re-engineer the existing wastewater treating plant (WWTP) and auxiliary functions. This case history shows how an old refinery limited by existing equipment, building space, operation`s availability requirements and costs divided the project into several design phases. The design team used a proactive approach with empowerment responsibilities to solve construction, equipment usagemore » and regulatory problems throughout the project`s lifetime. Focusing on front-end planning and customer service (the refinery), team members applied value-based engineering designs to keep costs down, implemented safe work practices during construction, used HAZOP reviews to scrutinize proposed designs for operating and maintenance procedures, etc. The result has been the renovation of a 50-year-old WWTP completed under budget, ontime and in compliance with federal mandates.« less
Marine Engine-Exhaust Emissions Test Cell
DOT National Transportation Integrated Search
1974-11-01
A marine engine exhaust emissions test cell for boat-size diesel engines (approx. 200 hp) and outboard engines was constructed as part of a project sponsored by the United States Coast Guard for the monitoring and control of emissions from marine sou...
14 CFR 151.55 - Accounting and audit.
Code of Federal Regulations, 2014 CFR
2014-01-01
...) Costs of force account construction. (5) Engineering costs of plans and designs. (6) Engineering costs... allowability of all incurred costs of the project. The sponsor shall segregate and group project costs so that it can furnish, on due notice, cost information in the following cost classifications: (1) Purchase...
14 CFR 151.55 - Accounting and audit.
Code of Federal Regulations, 2012 CFR
2012-01-01
...) Costs of force account construction. (5) Engineering costs of plans and designs. (6) Engineering costs... allowability of all incurred costs of the project. The sponsor shall segregate and group project costs so that it can furnish, on due notice, cost information in the following cost classifications: (1) Purchase...
14 CFR 151.55 - Accounting and audit.
Code of Federal Regulations, 2013 CFR
2013-01-01
...) Costs of force account construction. (5) Engineering costs of plans and designs. (6) Engineering costs... allowability of all incurred costs of the project. The sponsor shall segregate and group project costs so that it can furnish, on due notice, cost information in the following cost classifications: (1) Purchase...
14 CFR 151.55 - Accounting and audit.
Code of Federal Regulations, 2011 CFR
2011-01-01
...) Costs of force account construction. (5) Engineering costs of plans and designs. (6) Engineering costs... allowability of all incurred costs of the project. The sponsor shall segregate and group project costs so that it can furnish, on due notice, cost information in the following cost classifications: (1) Purchase...
The Duke Engineering Living Technology Advancement (DELTA) Project began as a multidisciplinary endeavor to engage engineering students by having them design aspects/attributes of a new learning and living space. In the next few years, the vision will be realized when the DEL...
Studies on combined model based on functional objectives of large scale complex engineering
NASA Astrophysics Data System (ADS)
Yuting, Wang; Jingchun, Feng; Jiabao, Sun
2018-03-01
As various functions were included in large scale complex engineering, and each function would be conducted with completion of one or more projects, combined projects affecting their functions should be located. Based on the types of project portfolio, the relationship of projects and their functional objectives were analyzed. On that premise, portfolio projects-technics based on their functional objectives were introduced, then we studied and raised the principles of portfolio projects-technics based on the functional objectives of projects. In addition, The processes of combined projects were also constructed. With the help of portfolio projects-technics based on the functional objectives of projects, our research findings laid a good foundation for management of large scale complex engineering portfolio management.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false After a bridge project has been completed (either PE or... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.41 After a bridge project has been completed (either PE or construction) what happens with...
ERIC Educational Resources Information Center
Menassa, Carol Chukri
2009-01-01
A project-specific dispute resolution ladder (DRL) typically consists of multiple alternative dispute resolution (ADR) techniques that are chosen to assist in mitigating the impact of change orders and claims (CCO) occurring during the project construction phase, and avoid their escalation to protracted disputes that adversely affect a…
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false After a bridge project has been completed (either PE or... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.41 After a bridge project has been completed (either PE or construction) what happens with...
25 CFR 900.110 - What does this subpart cover?
Code of Federal Regulations, 2013 CFR
2013-04-01
... contracts under this subpart are: design and architectural/engineering services, construction project management, and the actual construction of the building or facility in accordance with the construction... construction management services as defined in § 900.113 may be included in a construction contract under this...
25 CFR 900.110 - What does this subpart cover?
Code of Federal Regulations, 2014 CFR
2014-04-01
... contracts under this subpart are: design and architectural/engineering services, construction project management, and the actual construction of the building or facility in accordance with the construction... construction management services as defined in § 900.113 may be included in a construction contract under this...
25 CFR 900.110 - What does this subpart cover?
Code of Federal Regulations, 2011 CFR
2011-04-01
... contracts under this subpart are: design and architectural/engineering services, construction project management, and the actual construction of the building or facility in accordance with the construction... construction management services as defined in § 900.113 may be included in a construction contract under this...
25 CFR 900.110 - What does this subpart cover?
Code of Federal Regulations, 2012 CFR
2012-04-01
... contracts under this subpart are: design and architectural/engineering services, construction project management, and the actual construction of the building or facility in accordance with the construction... construction management services as defined in § 900.113 may be included in a construction contract under this...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Leib, Thomas; Cole, Dan
In late September 2014 development of the Lake Charles Clean Energy (LCCE) Plant was abandoned resulting in termination of Lake Charles Carbon Capture and Sequestration (CCS) Project which was a subset the LCCE Plant. As a result, the project was only funded through Phase 2A (Design) and did not enter Phase 2B (Construction) or Phase 2C (Operations). This report was prepared relying on information prepared and provided by engineering companies which were engaged by Leucadia Energy, LLC to prepare or review Front End Engineering and Design (FEED) for the Lake Charles Clean Energy Project, which includes the Carbon Capture andmore » Sequestration (CCS) Project in Lake Charles, Louisiana. The Lake Charles Carbon Capture and Sequestration (CCS) Project was to be a large-scale industrial CCS project intended to demonstrate advanced technologies that capture and sequester carbon dioxide (CO 2) emissions from industrial sources into underground formations. The Scope of work was divided into two discrete sections; 1) Capture and Compression prepared by the Recipient Leucadia Energy, LLC, and 2) Transport and Sequestration prepared by sub-Recipient Denbury Onshore, LLC. Capture and Compression-The Lake Charles CCS Project Final Technical Report describes the systems and equipment that would be necessary to capture CO 2 generated in a large industrial gasification process and sequester the CO 2 into underground formations. The purpose of each system is defined along with a description of its equipment and operation. Criteria for selection of major equipment are provided and ancillary utilities necessary for safe and reliable operation in compliance with environmental regulations are described. Construction considerations are described including a general arrangement of the CCS process units within the overall gasification project. A cost estimate is provided, delineated by system area with cost breakdown showing equipment, piping and materials, construction labor, engineering, and other costs. The CCS Project Final Technical Report is based on a Front End Engineering and Design (FEED) study prepared by SK E&C, completed in [June] 2014. Subsequently, Fluor Enterprises completed a FEED validation study in mid-September 2014. The design analyses indicated that the FEED package was sufficient and as expected. However, Fluor considered the construction risk based on a stick-build approach to be unacceptable, but construction risk would be substantially mitigated through utilization of modular construction where site labor and schedule uncertainty is minimized. Fluor’s estimate of the overall EPC project cost utilizing the revised construction plan was comparable to SKE&C’s value after reflecting Fluor’s assessment of project scope and risk characteristic. Development was halted upon conclusion of Phase 2A FEED and the project was not constructed.Transport and Sequestration – The overall objective of the pipeline project was to construct a pipeline to transport captured CO 2 from the Lake Charles Clean Energy project to the existing Denbury Green Line and then to the Hastings Field in Southeast Texas to demonstrate effective geologic sequestration of captured CO 2 through commercial EOR operations. The overall objective of the MVA portion of the project was to demonstrate effective geologic sequestration of captured CO 2 through commercial Enhanced Oil Recovery (EOR) operations in order to evaluate costs, operational processes and technical performance. The DOE target for the project was to capture and implement a research MVA program to demonstrate the sequestration through EOR of approximately one million tons of CO 2 per year as an integral component of commercial operations.« less
ERIC Educational Resources Information Center
Núñez, Cristina; Guinea, Ana; Callau, Sara; Bengoa, Christophe; Basco, Josep; Gavaldà, Jordi
2017-01-01
The Bachelor's Degree Final Project (BDFP) of our school aims to develop a real constructive project, enhance cooperative teamwork and increase productivity of students. We present a real case study, related with engineering and scientific innovation results obtained by BDFP, which has led to an innovative scientific study presented at the 7th…
FME Senior Project Managers: A Juggling Act of Multiple Projects | Poster
By Peggy Pearl, Contributing Writer It was not until the 1950s that organizations in the United States began to apply project management tools and techniques to complex construction and engineering projects (http://en.m.wikipedia.org/wiki/Project_life_cycle).
Code of Federal Regulations, 2013 CFR
2013-10-01
..., including architectural and engineering costs, and costs associated with compliance with the National.... Allowable costs means those project costs for which Federal funding may be expended under this part. Only construction and construction-related costs will be allowable. Construction means supervising, inspecting...
Code of Federal Regulations, 2014 CFR
2014-10-01
..., including architectural and engineering costs, and costs associated with compliance with the National.... Allowable costs means those project costs for which Federal funding may be expended under this part. Only construction and construction-related costs will be allowable. Construction means supervising, inspecting...
Code of Federal Regulations, 2012 CFR
2012-10-01
..., including architectural and engineering costs, and costs associated with compliance with the National.... Allowable costs means those project costs for which Federal funding may be expended under this part. Only construction and construction-related costs will be allowable. Construction means supervising, inspecting...
18 CFR 4.3 - Report on project cost.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Report on project cost... OF PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.3 Report on project..., cost records, engineering reports, and other records supporting the project's original cost. The audit...
18 CFR 4.3 - Report on project cost.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Report on project cost... OF PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.3 Report on project..., cost records, engineering reports, and other records supporting the project's original cost. The audit...
18 CFR 4.3 - Report on project cost.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Report on project cost... OF PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.3 Report on project..., cost records, engineering reports, and other records supporting the project's original cost. The audit...
18 CFR 4.3 - Report on project cost.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Report on project cost... OF PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.3 Report on project..., cost records, engineering reports, and other records supporting the project's original cost. The audit...
40 CFR 35.2114 - Value engineering.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Value engineering. 35.2114 Section 35... STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2114 Value engineering. (a) If the project has not received Step 2 grant assistance the applicant shall conduct value engineering...
40 CFR 35.2114 - Value engineering.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Value engineering. 35.2114 Section 35... STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2114 Value engineering. (a) If the project has not received Step 2 grant assistance the applicant shall conduct value engineering...
40 CFR 35.2114 - Value engineering.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Value engineering. 35.2114 Section 35... STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2114 Value engineering. (a) If the project has not received Step 2 grant assistance the applicant shall conduct value engineering...
40 CFR 35.2114 - Value engineering.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Value engineering. 35.2114 Section 35... STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2114 Value engineering. (a) If the project has not received Step 2 grant assistance the applicant shall conduct value engineering...
40 CFR 35.2114 - Value engineering.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Value engineering. 35.2114 Section 35... STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2114 Value engineering. (a) If the project has not received Step 2 grant assistance the applicant shall conduct value engineering...
Examining the Challenging Hindrances facing in the Construction Projects: South India’s Perspective
NASA Astrophysics Data System (ADS)
Subramanyam, K.; Haridharan, M. K.
2017-07-01
Developing countries like India require a huge infrastructure to facilitate needs of the people. Construction industry provides several opportunities to the individuals. Construction manager work is to supervise and organize the construction activities in construction projects. Now a day construction manager facing challenges. This paper aimed to study the challenges facing by the construction manager in the perception of construction professionals. 39 variables were taken from the literature review which found to be severe impact on construction managers’ performance. Construction manager, project manager and site engineers are the respondents for this survey. Using SPSS, regression analysis was done and recognized significant challenges. These challenges were classified into 5 domains. In management challenges, resource availability and allocation, risks and uncertainties existing in the project onsite, top management support and cost constraints are the most significant variables. In skills requirement of a construction manager challenges, technical skills required to learn and adapt new technology in the project, decision making and planning according to the situation in site are the most significant variables. In performance challenges, implementation of tasks according to the plan is the important variable whereas in onsite challenges, manage project risks, develop project policies and procedures are the most important.
NASA Astrophysics Data System (ADS)
Chowdhury, Tamara
2013-08-01
Senior design courses are a core part of curricula across engineering and technology disciplines. Such courses offer Construction Management (CMG) students the opportunity to bring together, assimilate and apply the knowledge they have acquired over their entire undergraduate academic programme to an applied technical project. Senior or Capstone design course engages students in a real-world project, enhance leadership development, and prepare to manage and lead project teams. The CMG programme's multidisciplinary approach at Alabama A&M University, combines essential components of construction techniques with concepts of business management to develop technically qualified individuals for responsible management roles in the design, construction and operation of major construction projects. This paper analyses the performance of the students and improvement due to the interaction with the faculty advisors and industrial panel during the two semester Capstone project. The results of this Capstone sequence have shown a continuous improvement of student performance.
A Proposal for the use of the Consortium Method in the Design-build system
NASA Astrophysics Data System (ADS)
Miyatake, Ichiro; Kudo, Masataka; Kawamata, Hiroyuki; Fueta, Toshiharu
In view of the necessity for efficient implementation of public works projects, it is expected to utilize advanced technical skills of private firms, for the purpose of reducing project costs, improving performance and functions of construction objects, and reducing work periods, etc. The design-build system is a method to order design and construction as a single contract, including design of structural forms and main specifications of the construction object. This is a system in which high techniques of private firms can be utilized, as a means to ensure qualities of design and construction, rational design, and efficiency of the project. The objective of this study is to examine the use of a method to form a consortium of civil engineering consultants and construction companies, as it is an issue related to the implementation of the design-build method. Furthermore, by studying various forms of consortiums to be introduced in future, it proposes procedural items required to utilize this method, during the bid and after signing a contract, such as the estimate submission from the civil engineering consultants etc.
ERIC Educational Resources Information Center
Pretelín-Ricárdez, Angel; Sacristán, Ana Isabel
2015-01-01
We present some results of an ongoing research project where university engineering students were asked to construct videogames involving the use of physical systems models. The objective is to help them identify and understand the elements and concepts involved in the modelling process. That is, we use game design as a constructionist approach…
Strohmaier, Markus; Walk, Simon; Pöschko, Jan; Lamprecht, Daniel; Tudorache, Tania; Nyulas, Csongor; Musen, Mark A; Noy, Natalya F
2013-05-01
Traditionally, evaluation methods in the field of semantic technologies have focused on the end result of ontology engineering efforts, mainly, on evaluating ontologies and their corresponding qualities and characteristics. This focus has led to the development of a whole arsenal of ontology-evaluation techniques that investigate the quality of ontologies as a product . In this paper, we aim to shed light on the process of ontology engineering construction by introducing and applying a set of measures to analyze hidden social dynamics. We argue that especially for ontologies which are constructed collaboratively, understanding the social processes that have led to its construction is critical not only in understanding but consequently also in evaluating the ontology. With the work presented in this paper, we aim to expose the texture of collaborative ontology engineering processes that is otherwise left invisible. Using historical change-log data, we unveil qualitative differences and commonalities between different collaborative ontology engineering projects. Explaining and understanding these differences will help us to better comprehend the role and importance of social factors in collaborative ontology engineering projects. We hope that our analysis will spur a new line of evaluation techniques that view ontologies not as the static result of deliberations among domain experts, but as a dynamic, collaborative and iterative process that needs to be understood, evaluated and managed in itself. We believe that advances in this direction would help our community to expand the existing arsenal of ontology evaluation techniques towards more holistic approaches.
Strohmaier, Markus; Walk, Simon; Pöschko, Jan; Lamprecht, Daniel; Tudorache, Tania; Nyulas, Csongor; Musen, Mark A.; Noy, Natalya F.
2013-01-01
Traditionally, evaluation methods in the field of semantic technologies have focused on the end result of ontology engineering efforts, mainly, on evaluating ontologies and their corresponding qualities and characteristics. This focus has led to the development of a whole arsenal of ontology-evaluation techniques that investigate the quality of ontologies as a product. In this paper, we aim to shed light on the process of ontology engineering construction by introducing and applying a set of measures to analyze hidden social dynamics. We argue that especially for ontologies which are constructed collaboratively, understanding the social processes that have led to its construction is critical not only in understanding but consequently also in evaluating the ontology. With the work presented in this paper, we aim to expose the texture of collaborative ontology engineering processes that is otherwise left invisible. Using historical change-log data, we unveil qualitative differences and commonalities between different collaborative ontology engineering projects. Explaining and understanding these differences will help us to better comprehend the role and importance of social factors in collaborative ontology engineering projects. We hope that our analysis will spur a new line of evaluation techniques that view ontologies not as the static result of deliberations among domain experts, but as a dynamic, collaborative and iterative process that needs to be understood, evaluated and managed in itself. We believe that advances in this direction would help our community to expand the existing arsenal of ontology evaluation techniques towards more holistic approaches. PMID:24311994
Code of Federal Regulations, 2014 CFR
2014-04-01
... PROJECT COSTS Determination of Cost of Constructed Projects not Subject to Section 23(a) of the Act § 4.21 Reports. Representatives of the Commission will inspect the project works, engineering reports, and other records of the project, check the inventory and estimated depreciation, make an audit of the books...
Code of Federal Regulations, 2011 CFR
2011-04-01
... PROJECT COSTS Determination of Cost of Constructed Projects not Subject to Section 23(a) of the Act § 4.21 Reports. Representatives of the Commission will inspect the project works, engineering reports, and other records of the project, check the inventory and estimated depreciation, make an audit of the books...
Challenges for Engineering Design, Construction, and Maintenance of Infrastructure in Afghanistan
2010-11-01
applied engineering expertise that collectively can solve challenging infra- structure problems. USACE-ERDC’s researchers and engineers are field...Development Center (ERDC) possesses a unique combination of basic research and applied engineering expertise that collectively can solve challenging...restoration, and other projects. The USACE Engineer Research and Development Center (ERDC) possesses a unique combination of basic research and applied
1989-09-01
OGT, F1EPQRTJTL4, W" - 3^ n"r-- n *ON EXPERT SYSTEMS IN DESIGN, CONSTRUCTION AND’, IWAJNTENANCE-OF STRUCTURES Arockiasamy, Sunghoon Lee Clepartrhent...based expert system applications in the areas of structural design, design standards, and construction planning. This study will aid in the development...of a comprehensive expert system for tvical hydraulic structures. Funding for this report was provided by the US Army Engineer Waterways Experiment
Economic analysis of transmission line engineering based on industrial engineering
NASA Astrophysics Data System (ADS)
Li, Yixuan
2017-05-01
The modern industrial engineering is applied to the technical analysis and cost analysis of power transmission and transformation engineering. It can effectively reduce the cost of investment. First, the power transmission project is economically analyzed. Based on the feasibility study of power transmission and transformation project investment, the proposal on the company system cost management is put forward through the economic analysis of the effect of the system. The cost management system is optimized. Then, through the cost analysis of power transmission and transformation project, the new situation caused by the cost of construction is found. It is of guiding significance to further improve the cost management of power transmission and transformation project. Finally, according to the present situation of current power transmission project cost management, concrete measures to reduce the cost of power transmission project are given from the two aspects of system optimization and technology optimization.
Concrete pavement construction basics : tech notes.
DOT National Transportation Integrated Search
2006-08-01
This tech note has been produced for developers, consultants, and engineers planning concrete pavement construction projects, superintendents and supervisors who want a basic training aid and reference, and crew members new to the concrete paving ind...
An Engineering Report in Civil Engineering and Management.
1987-12-01
programs as the Apollo program and the Canaveral program. Progress in the late 70s and the 80s has seen advancements in the application of sophisticated...other forces in military operations; subsequent combat service support ashore and defense against overt or clandestine enemy attacks directed toward...construction execution plans; assigns construction projects to NCF units; monitors progress and assures adherence to quality standards: directs
Benzley, Steven E
2006-04-01
This paper presents an academic project that addresses the issue of international corruption in the engineering and construction industry, in a manner that effectively incorporates several learning experiences. The major objectives of the project are to provide the students a learning activity that will 1) make a meaningful contribution within the disciplines being studied; 2) teach by experience a significant principle that can be valuable in numerous situations during an individual's career, and 3) engage the minds, experiences, and enthusiasm of the participants in a real ethical challenge that is prevalent in all of their chosen professional fields. The paper describes the full details of the project, the actual implementation of it during Winter Semester 2005, the experiences gained during the initial trial, and the modifications and improvements incorporated for future implementation.
Lunar base and Mars base design projects
NASA Technical Reports Server (NTRS)
Amos, J.; Campbell, J.; Hudson, C.; Kenny, E.; Markward, D.; Pham, C.; Wolf, C.
1989-01-01
The space design classes at the University of Texas at Austin undertook seven projects in support of the NASA/USRA advanced space design program during the 1988-89 year. A total of 51 students, including 5 graduate students, participated in the design efforts. Four projects were done within the Aerospace Engineering (ASE) design program and three within the Mechanical Engineering (ME) program. Both lunar base and Mars base design efforts were studied, and the specific projects were as follows: Lunar Crew Emergency Rescue Vehicle (ASE); Mars Logistics Lander Convertible to a Rocket Hopper (ME); A Robotically Constructed Production and Supply Base on Phobos (ASE); A Mars/Phobos Transportation System (ASE); Manned Base Design and Related Construction Issues for Mars/Phobos Mission (ME); and Health Care Needs for a Lunar Colony and Design of Permanent Medical Facility (ME).
Code of Federal Regulations, 2014 CFR
2014-04-01
... PROJECT COSTS Determination of Fair Value of Constructed Projects, Under Section 23(a) of the Act § 4.11 Reports. Representatives of the Commission will inspect the project works, engineering reports, and other records of the project, check the inventory and make an appraisal of the property and an audit of the...
Code of Federal Regulations, 2011 CFR
2011-04-01
... PROJECT COSTS Determination of Fair Value of Constructed Projects, Under Section 23(a) of the Act § 4.11 Reports. Representatives of the Commission will inspect the project works, engineering reports, and other records of the project, check the inventory and make an appraisal of the property and an audit of the...
49 CFR 602.13 - Eligible activities.
Code of Federal Regulations, 2013 CFR
2013-10-01
...) Emergency repairs; (4) Permanent repairs; (5) Actual engineering and construction costs on approved projects... maintenance; (2) Project costs for which the recipient has received funding from another Federal agency; (3) Project costs for which the recipient has received funding through payments from insurance policies; (4...
ERIC Educational Resources Information Center
Terasawa, Ikuo
2016-01-01
The challenge study is a project based learning curriculum at Technical High School aimed at the construction of a wireless communication system. The first period was engineering issues in the construction of an artificial satellite and the second period was a positional locating system based on the general purpose wire-less device--ZigBee device.…
34. From Final Construction Report on the Haleakala Road ProjectNR7, ...
34. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii, H.L. Handley, Assistant Highway Engineer, March 30, 1935. NOTE HOW THE LOCATION FITS THE CONTOUR OF THE HILL. LOOKING FROM STATION 382+00 ON HALEAKALA HIGHWAY. - Haleakala National Park Roads, Pukalani, Maui County, HI
Finally Underway: Implementation of the Port Hope Area Initiative - 13151
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fahey, Christine A.; Palmeter, Tim; Blanchette, Marcia
2013-07-01
Two distinct yet closely related waste remediation projects are finally underway in Canada under the Port Hope Area Initiative (PHAI) which aims to clean up 1.7 million cubic metres (m{sup 3}) of low-level radioactive waste (LLRW) arising from 60 years of uranium and radium operations. Under the PHAI, the Port Hope Project and the smaller Port Granby Project will result in the consolidation of the LLRW within two highly engineered, above-ground mounds, to be constructed within the municipalities of Port Hope and Clarington. These projects will fulfill the federal government commitment to the safe, long-term management of the LLRW, asmore » set out in the legal agreement signed by the government and the host municipalities in 2001. The federal authorization to commence PHAI Remediation and Construction Phase 2 was received in late 2011 and several enabling infrastructure construction and radiological survey contracts were awarded in 2012. The contracts to remediate the waste sites and construct the new engineered mounds will be tendered in 2013. At the end of Phase 2, environmental risks will be substantially mitigated, land development restrictions lifted, and an honourable legacy left for future generations. (authors)« less
The goal of this project was to determine hydraulic and carbon loading rates for constructed wetlands required for achieving different levels of organic and nanomaterial contaminants of emerging concern (CECs) removal in constructed wetlands. Specific research objectives included...
Study of Collaborative Management for Transportation Construction Project Based on BIM Technology
NASA Astrophysics Data System (ADS)
Jianhua, Liu; Genchuan, Luo; Daiquan, Liu; Wenlei, Li; Bowen, Feng
2018-03-01
Abstract. Building Information Modeling(BIM) is a building modeling technology based on the relevant information data of the construction project. It is an advanced technology and management concept, which is widely used in the whole life cycle process of planning, design, construction and operation. Based on BIM technology, transportation construction project collaborative management can have better communication through authenticity simulation and architectural visualization and can obtain the basic and real-time information such as project schedule, engineering quality, cost and environmental impact etc. The main services of highway construction management are integrated on the unified BIM platform for collaborative management to realize information intercommunication and exchange, to change the isolated situation of information in the past, and improve the level of information management. The final BIM model is integrated not only for the information management of project and the integration of preliminary documents and design drawings, but also for the automatic generation of completion data and final accounts, which covers the whole life cycle of traffic construction projects and lays a good foundation for smart highway construction.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Flanigan, Tom; Pybus, Craig; Roy, Sonya
This report summarizes the results of the Pre-Front End Engineering Design (pre-FEED) phase of a proposed advanced oxy-combustion power generation plant to repower the existing 200 MWe Unit 4 at Ameren Energy Resources’ (AER) Meredosia Power Plant. AER has formed an alliance with Air Liquide Process and Construction, Inc. (ALPC) and Babcock & Wilcox Power Generation Group (B&W PGG) for the design, construction, and testing of the facility, and has contracted with URS Corporation (URS) for preliminary design and Owner’s engineering services. The Project employs oxy-combustion technology – combustion of coal with nearly pure oxygen and recycled flue gas (insteadmore » of air) – to capture approximately 90% of the flue gas CO2 for transport and sequestration by another Project. Plant capacity and configuration has been developed based on the B&W PGG-ALPC cool recycle process firing high-sulfur bituminous coal fuel, assuming baseload plant operation to maximize existing steam turbine capability, with limited consideration for plant redundancy and performance optimization in order to keep plant costs as low as practical. Activities and preliminary results from the pre-FEED phase addressed in this report include the following: Overall plant thermal performance; Equipment sizing and system configuration; Plant operation and control philosophy; Plant emissions and effluents; CO 2 production and recovery characteristics; Project cost estimate and economic evaluation; Integrated project engineering and construction schedule; Project risk and opportunity assessment; Development of Project permitting strategy and requirements During the Phase 2 of the Project, additional design details will be developed and the Phase 1 work products updated to support actual construction and operation of the facility in Phase 3. Additional information will be provided early in Phase 2 to support Ameren-Environmental in finalizing the appropriate permitting strategies and permit applications. Additional performance and reliability enhancements will also be evaluated in Phase 2 to try to improve overall project economics.« less
49 CFR 256.7 - Financial assistance.
Code of Federal Regulations, 2010 CFR
2010-10-01
... passenger terminal, under subsection 4(i)(2) of the Act, may be expended for the following project costs incurred after the date of final project approval: (1) Acquisition or long-term lease of real property or... project implementation; (2) Final architectural and engineering construction documentation, including all...
System engineering and science projects: lessons from MeerKAT
NASA Astrophysics Data System (ADS)
Kapp, Francois
2016-08-01
The Square Kilometre Array (SKA) is a large science project planning to commence construction of the world's largest Radio Telescope after 2018. MeerKAT is one of the precursor projects to the SKA, based on the same site that will host the SKA Mid array in the central Karoo area of South Africa. From the perspective of signal processing hardware development, we analyse the challenges that MeerKAT encountered and extrapolate them to SKA in order to prepare the System Engineering and Project Management methods that could contribute to a successful completion of SKA. Using the MeerKAT Digitiser, Correlator/Beamformer and Time and Frequency Reference Systems as an example, we will trace the risk profile and subtle differences in engineering approaches of these systems over time and show the effects of varying levels of System Engineering rigour on the evolution of their risk profiles. It will be shown that the most rigorous application of System Engineering discipline resulted in the most substantial reduction in risk over time. Since the challenges faced by SKA are not limited to that of MeerKAT, we also look into how that translates to a system development where there is substantial complexity in both the created system as well as the creating system. Since the SKA will be designed and constructed by consortia made up from the ten member countries, there are many additional complexities to the organisation creating the system - a challenge the MeerKAT project did not encounter. Factors outside of engineering, for instance procurement models and political interests, also play a more significant role, and add to the project risks of SKA when compared to MeerKAT.
DOT National Transportation Integrated Search
2003-08-01
The objective of this report is to raise awareness among designers construction engineers, and managers of the applications and benefits of full road closure during rehabilitation and construction activities. Based on interviews with project personne...
23 CFR 652.13 - Design and construction criteria.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false Design and construction criteria. 652.13 Section 652.13 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS PEDESTRIAN AND BICYCLE ACCOMMODATIONS AND PROJECTS § 652.13 Design and construction criteria. (a) The American Association of State Highway and...
Code of Federal Regulations, 2013 CFR
2013-01-01
... impacts. (2) Applicable engineering, design/build, construction management, inspection and plant start-up... imposed by construction, equipment, material or service contracts, penalty payments, damage claims, awards... consultants with suitable experience, training and professional competence in the design and construction of...
Code of Federal Regulations, 2010 CFR
2010-01-01
... impacts. (2) Applicable engineering, design/build, construction management, inspection and plant start-up... imposed by construction, equipment, material or service contracts, penalty payments, damage claims, awards... consultants with suitable experience, training and professional competence in the design and construction of...
A Principal's Guide to On-Site School Construction
ERIC Educational Resources Information Center
Brenner, William A.
2009-01-01
This paper addresses construction that takes place in or near the school building while school is in session--the most difficult kind of construction to manage. Success largely depends upon the preparation, competence, and goodwill of the school district's facility staff, the project architect/engineer, the contractor, and local school…
Implementing large projects in software engineering courses
NASA Astrophysics Data System (ADS)
Coppit, David
2006-03-01
In software engineering education, large projects are widely recognized as a useful way of exposing students to the real-world difficulties of team software development. But large projects are difficult to put into practice. First, educators rarely have additional time to manage software projects. Second, classrooms have inherent limitations that threaten the realism of large projects. Third, quantitative evaluation of individuals who work in groups is notoriously difficult. As a result, many software engineering courses compromise the project experience by reducing the team sizes, project scope, and risk. In this paper, we present an approach to teaching a one-semester software engineering course in which 20 to 30 students work together to construct a moderately sized (15KLOC) software system. The approach combines carefully coordinated lectures and homeworks, a hierarchical project management structure, modern communication technologies, and a web-based project tracking and individual assessment system. Our approach provides a more realistic project experience for the students, without incurring significant additional overhead for the instructor. We present our experiences using the approach the last 2 years for the software engineering course at The College of William and Mary. Although the approach has some weaknesses, we believe that they are strongly outweighed by the pedagogical benefits.
Application and research of recyclable cables in foundation pit support engineering
NASA Astrophysics Data System (ADS)
Zheng, Suping
2018-05-01
Anchoring cables are widely used in the construction of foundation pit as a temporary support structure. After the construction is completed, the anchor cables left in the ground will not only cause environmental pollution but also cause a great waste of resources. The emergence of recyclable cable technology, to avoid such problems, to achieve the secondary use of the anchor cable, excavation in the excavation project is more and more widely used. Combined with the design and construction of recoverable anchor cable in engineering practice, the application effect of recoverable anchor cable in foundation pit support is analyzed, and the conclusion that the support effect of recoverable anchor cable is stable and safe can be obtained Recyclable anchor cable in the future support projects to provide a reference.
Code of Federal Regulations, 2011 CFR
2011-04-01
... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION CIVIL RIGHTS EXTERNAL PROGRAMS Construction Contract... means a Federal or State employee regularly employed and experienced in civil rights policies, practices... include preliminary engineering work in project development or engineering services performed by or for a...
Code of Federal Regulations, 2014 CFR
2014-04-01
... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION CIVIL RIGHTS EXTERNAL PROGRAMS Construction Contract... means a Federal or State employee regularly employed and experienced in civil rights policies, practices... include preliminary engineering work in project development or engineering services performed by or for a...
Code of Federal Regulations, 2013 CFR
2013-04-01
... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION CIVIL RIGHTS EXTERNAL PROGRAMS Construction Contract... means a Federal or State employee regularly employed and experienced in civil rights policies, practices... include preliminary engineering work in project development or engineering services performed by or for a...
Code of Federal Regulations, 2012 CFR
2012-04-01
... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION CIVIL RIGHTS EXTERNAL PROGRAMS Construction Contract... means a Federal or State employee regularly employed and experienced in civil rights policies, practices... include preliminary engineering work in project development or engineering services performed by or for a...
Code of Federal Regulations, 2010 CFR
2010-04-01
... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION CIVIL RIGHTS EXTERNAL PROGRAMS Construction Contract... means a Federal or State employee regularly employed and experienced in civil rights policies, practices... include preliminary engineering work in project development or engineering services performed by or for a...
Application Analysis of BIM Technology in Metro Rail Transit
NASA Astrophysics Data System (ADS)
Liu, Bei; Sun, Xianbin
2018-03-01
With the rapid development of urban roads, especially the construction of subway rail transit, it is an effective way to alleviate urban traffic congestion. There are limited site space, complex resource allocation, tight schedule, underground pipeline complex engineering problems. BIM technology, three-dimensional visualization, parameterization, virtual simulation and many other advantages can effectively solve these technical problems. Based on the project of Shenzhen Metro Line 9, BIM technology is innovatively researched throughout the lifecycle of BIM technology in the context of the metro rail transit project rarely used at this stage. The model information file is imported into Navisworks for four-dimensional animation simulation to determine the optimum construction scheme of the shield machine. Subway construction management application platform based on BIM and private cloud technology, the use of cameras and sensors to achieve electronic integration, dynamic monitoring of the operation and maintenance of underground facilities. Make full use of the many advantages of BIM technology to improve the engineering quality and construction efficiency of the subway rail transit project and to complete the operation and maintenance.
Decision problems in management of construction projects
NASA Astrophysics Data System (ADS)
Szafranko, E.
2017-10-01
In a construction business, one must oftentimes make decisions during all stages of a building process, from planning a new construction project through its execution to the stage of using a ready structure. As a rule, the decision making process is made more complicated due to certain conditions specific for civil engineering. With such diverse decision situations, it is recommended to apply various decision making support methods. Both, literature and hands-on experience suggest several methods based on analytical and computational procedures, some less and some more complex. This article presents the methods which can be helpful in supporting decision making processes in the management of civil engineering projects. These are multi-criteria methods, such as MCE, AHP or indicator methods. Because the methods have different advantages and disadvantages, whereas decision situations have their own specific nature, a brief summary of the methods alongside some recommendations regarding their practical applications has been given at the end of the paper. The main aim of this article is to review the methods of decision support and their analysis for possible use in the construction industry.
Construction. A Report on the Industry
2004-06-01
Transportation and Tres Urbano Subway Project, San Juan, Puerto Rico U.S. Corps of Engineers, San Juan, Puerto Rico U.S. Corps of Engineers, Mobile...recently approved a plan to privatize construction of over 6,000 miles of expressways through the use of a build, transfer, and operate options.xl...security standards in Federal facilities, including an aggressive plan to build and renovate embassies and consular offices worldwide.xlv The
1990-01-01
76,951,000 shall be available for study , planning, design, architect and engineer services, as authorized by law, unless the Secretary of Defense...FROM OTHER APPROPRIATIONS - (NCN-ADD) ( 0) 10. DESCRIPTION OF PROPOSED CONSTRUCTION This is a public private venture project using 10 U.S.C. 2809...FROM OTHER APPROPRIATIONS - - (NDN-ADD) ( 0) 10. DESCRIPTION OF PROPOSED CONSTRUCTION This is a public/private venture project using 10 U.S.C. 2809
36 CFR 327.30 - Shoreline Management on Civil Works Projects.
Code of Federal Regulations, 2010 CFR
2010-07-01
... ADMINISTERED BY THE CHIEF OF ENGINEERS § 327.30 Shoreline Management on Civil Works Projects. (a) Purpose. The... this regulation, shoreline management plans are not required for those projects where construction was... approval, one copy of each project Shoreline Management Plan will be forwarded to HQUSACE (CECW-ON) WASH DC...
APPLICATION OF THE 3D MODEL OF RAILWAY VIADUCTS TO COST ESTIMATION AND CONSTRUCTION
NASA Astrophysics Data System (ADS)
Fujisawa, Yasuo; Yabuki, Nobuyoshi; Igarashi, Zenichi; Yoshino, Hiroyuki
Three dimensional models of civil engineering structures are only partially used in either design or construction but not both. Research on integration of design, cost estimation and construction by 3Dmodels has not been heard in civil engineering domain yet. Using continuously a 3D product model of a structure from design to construction through estimation should improve the efficiency and decrease the occurrence of mistakes, hence enhancing the quality. In this research, we investigated the current practices of flow from design to construction, particularly focusing on cost estimation. Then, we identified advantages and issues on utilization of 3D design models to estimation and construction by applying 3D models to an actual railway construction project.
A Maritime Phase Zero Force for the Year 2020
2009-06-01
mind, the team constructed maritime forces and then evaluated them against the same scenarios to determine which ones performed better. The...120 1. Project Methodology and Choice of Missions ...............................120 2. Missions and Scenarios construction methodology... projects are designed to build tools that students in the Systems Engineering Analysis curriculum have learned over the 18 month enrollment in the program
Julee A Herdt; John Hunt; Kellen Schauermann
2016-01-01
This project demonstrates newly invented, biobased construction materials developed by applying lowcarbon, biomass waste sources through the Authorsâ engineered fiber processes and technology. If manufactured and applied large-scale the project inventions can divert large volumes of cellulose waste into high-performance, low embodied energy, environmental construction...
Geotechnical Materials Database for Embankment Design and Construction
DOT National Transportation Integrated Search
2011-12-01
This project was focused on the assimilation of engineering properties of borrow soils across the state of : South Carolina. Extensive data on soils used for embankment construction were evaluated and compared : within Group A (Piedmont) and Group B ...
Code of Federal Regulations, 2010 CFR
2010-04-01
... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS DESIGN STANDARDS FOR HIGHWAYS § 625.3 Application. (a) Applicable Standards. (1) Design and construction standards for...) Federal-aid projects not on the NHS are to be designed, constructed, operated, and maintained in...
Code of Federal Regulations, 2012 CFR
2012-04-01
... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS DESIGN STANDARDS FOR HIGHWAYS § 625.3 Application. (a) Applicable Standards. (1) Design and construction standards for...) Federal-aid projects not on the NHS are to be designed, constructed, operated, and maintained in...
Code of Federal Regulations, 2013 CFR
2013-04-01
... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS DESIGN STANDARDS FOR HIGHWAYS § 625.3 Application. (a) Applicable Standards. (1) Design and construction standards for...) Federal-aid projects not on the NHS are to be designed, constructed, operated, and maintained in...
Code of Federal Regulations, 2014 CFR
2014-04-01
... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS DESIGN STANDARDS FOR HIGHWAYS § 625.3 Application. (a) Applicable Standards. (1) Design and construction standards for...) Federal-aid projects not on the NHS are to be designed, constructed, operated, and maintained in...
Code of Federal Regulations, 2010 CFR
2010-04-01
... AMENDMENTS TO THE INDIAN SELF-DETERMINATION AND EDUCATION ACT Construction § 1000.243 What special provisions... building codes and applicable engineering standards, appropriate for the particular project; and (3...
Code of Federal Regulations, 2010 CFR
2010-04-01
... INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Construction § 900.120 How does an Indian tribe or..., engineering reports, design reports, plans of requirements, cost estimates, environmental assessments, or...
"Dirt Cheap" Project Teaches Soils Engineering
ERIC Educational Resources Information Center
Roman, Harry T.
2010-01-01
This article describes a soil-testing activity that enables students to learn some interesting and useful things about how soil behaves under varied conditions. It offers a great way to give them a practical pre-engineering experience and will show them how engineers think about construction and how local soils influence building design. The…
23 CFR 636.119 - How does this part apply to a project developed under a public-private partnership?
Code of Federal Regulations, 2012 CFR
2012-04-01
... OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING General § 636.119 How... engineering service contracts, 23 CFR part 635 for construction contracts and the requirements of this part...
Development of the New Educational Content "small Uas in Civil Engineering Application Scenarios"
NASA Astrophysics Data System (ADS)
Levin, E.; Vach, K.; Shults, R.
2017-12-01
The key point of this paper is presentation of the main idea and some results of the project "Small UAS in civil engineering application scenarios" (SUAS-CAS). This project was proposed by newly established in 2016 ISPRS WG V/7: "Innovative Technologies in Training Civil Engineers and Architects". Here we are presenting our experience in using low-cost UAS in training architects at Kyiv National University of Construction and Architecture, which was chosen as basic for this project. In the first part of paper, the project outline is presented. Then the first and possible follow project outcomes were described. In some details is described the training module "Small UAS in architecture" which was developed and included as a part of the subject "Architectural photogrammetry".
Electronic transport properties of lead nanowires
NASA Astrophysics Data System (ADS)
Zhang, Lishu; Zhou, Yi; Dai, Xinyue; Zhao, Zhenyang; Li, Hui
2017-06-01
Not Available Project supported by the National Natural Science Foundation of China (Grant No. 51671114) and the Special Funding in the Project of the Taishan Scholar Construction Engineering and National Key Research Program of China (Grant No. 2016YFB0300501).
home about peer news events research products laboratories publications nisee b.i.p. members Engineering Services is Hiring Bridge Design and Bridge Construction Engineers 05/16/18 - PEER Research Research Project Highlight: "Dissipative Base Connections for Moment Frame Structures in Airports and
Aircraft photovoltaic power-generating system
NASA Astrophysics Data System (ADS)
Doellner, Oscar Leonard
Photovoltaic cells, appropriately cooled and operating in the combustion-created high radiant-intensity environment of gas-turbine and jet engines, may replace the conventional (gearbox-driven) electrical power generators aboard jet aircraft. This study projects significant improvements not only in aircraft electrical power-generating-system performance, but also in overall aircraft performance. Jet-engine design modifications incorporating this concept not only save weight (and thus fuel), but are - in themselves - favorable to jet-engine performance. The dissertation concentrates on operational, constructional, structural, thermal, optical, radiometrical, thin-film, and solid-state theoretical aspects of the overall project.
VE at Scope Time (VEST): Three construction examples
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sperling, R.B.
1991-04-01
Value Engineering at Scope Time (VEST)'' was published in Value World, January-February-March 1991. That article describes VEST as a four-phase process utilizing the heart'' of VE methodology, which is designed to be used with members of construction design teams to help them focus on the scope of work by doing cost modeling, function analysis, brainstorming and evaluation of ideas. With minimal training designers, architects and engineers can become energized to find creative design solutions and learn an effective, synergistic team approach to facilities design projects using VEST. If time is available, the team can begin the development of some highermore » ranked ideas into preliminary proposals. This paper is an expansion of that article, adding a brief section on training and presenting three examples of VEST on construction projects at a federally-funded research Laboratory.« less
Manhattan Project buildings and facilities at the Hanford Site: A construction history
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gerber, M.S.
1993-09-01
This document thoroughly examines the role that the Hanford Engineer Works played in the Manhattan project. The historical aspects of the buildings and facilities are characterized. An in depth look at the facilities, including their functions, methods of fabrication and appearance is given for the 100 AREAS, 200 AREAS, 300 AREAS, 500, 800 and 900 AREAS, 600 AREA, 700 AREA, 1100 AREA and temporary construction structures.
ERIC Educational Resources Information Center
Hotaling, Liesl; Lowes, Susan; Stolkin, Rustam; Lin, Peiyi; Bonner, James; Kirkey, William; Ojo, Temitope
2012-01-01
This paper describes the structure and impact of an NSF-funded ITEST project designed to enrich science, technology, engineering, and mathematics (STEM) education using educational modules that teach students to construct, program, and test a series of sensors used to monitor water quality. During the two years of the SENSE IT project, over 30…
Social cost impact assessment of pipeline infrastructure projects
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, John C., E-mail: matthewsj@battelle.org; Allouche, Erez N., E-mail: allouche@latech.edu; Sterling, Raymond L., E-mail: sterling@latech.edu
A key advantage of trenchless construction methods compared with traditional open-cut methods is their ability to install or rehabilitate underground utility systems with limited disruption to the surrounding built and natural environments. The equivalent monetary values of these disruptions are commonly called social costs. Social costs are often ignored by engineers or project managers during project planning and design phases, partially because they cannot be calculated using standard estimating methods. In recent years some approaches for estimating social costs were presented. Nevertheless, the cost data needed for validation of these estimating methods is lacking. Development of such social cost databasesmore » can be accomplished by compiling relevant information reported in various case histories. This paper identifies eight most important social cost categories, presents mathematical methods for calculating them, and summarizes the social cost impacts for two pipeline construction projects. The case histories are analyzed in order to identify trends for the various social cost categories. The effectiveness of the methods used to estimate these values is also discussed. These findings are valuable for pipeline infrastructure engineers making renewal technology selection decisions by providing a more accurate process for the assessment of social costs and impacts. - Highlights: • Identified the eight most important social cost factors for pipeline construction • Presented mathematical methods for calculating those social cost factors • Summarized social cost impacts for two pipeline construction projects • Analyzed those projects to identify trends for the social cost factors.« less
A Multi- and Cross-Disciplinary Capstone Experience in Engineering Art: Animatronic Polar Bear
ERIC Educational Resources Information Center
Sirinterlikci, Arif; Toukonen, Kayne; Mason, Steve; Madison, Russel
2005-01-01
An animatronic robot was designed and constructed for the 2003 Annual Student Robotic Technology and Engineering Challenge organized by the Robotics International (RI) association of the Society of Manufacturing Engineers (SME). It was also the senior capstone design project for two of the design team members. After a thorough study of body and…
Gendered Practices of Constructing an Engineering Identity in a Problem-Based Learning Environment
ERIC Educational Resources Information Center
Du, Xiang-Yun
2006-01-01
This article examines the learning experiences of engineering students of both genders in a problem-based and project-organized learning environment (PBL) at a Danish university. This study relates an amalgam of theories on learning and gender to the context of engineering education. Based on data from a qualitative study of an electrical and…
ERIC Educational Resources Information Center
Olawumi, Timothy Oluwatosin; Ayegun, Olaleke Amos
2016-01-01
The role of the quantity surveyor is one that is often unclear amongst the general public. This study discussed the competencies of the quantity surveyor in measuring and managing civil engineering works and also carrying out the financial management for civil engineering construction projects; also outlined the various competencies and skills…
EOD and Engineers Close the Gap
2005-03-01
Engineers ’ Close the Gap ’ 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT...action to accomplish missions effectively in the COE. However, tomorrow’s construct will not only “ close the gap ” between EOD and engineers, it will close
Automated Reuse of Scientific Subroutine Libraries through Deductive Synthesis
NASA Technical Reports Server (NTRS)
Lowry, Michael R.; Pressburger, Thomas; VanBaalen, Jeffrey; Roach, Steven
1997-01-01
Systematic software construction offers the potential of elevating software engineering from an art-form to an engineering discipline. The desired result is more predictable software development leading to better quality and more maintainable software. However, the overhead costs associated with the formalisms, mathematics, and methods of systematic software construction have largely precluded their adoption in real-world software development. In fact, many mainstream software development organizations, such as Microsoft, still maintain a predominantly oral culture for software development projects; which is far removed from a formalism-based culture for software development. An exception is the limited domain of safety-critical software, where the high-assuiance inherent in systematic software construction justifies the additional cost. We believe that systematic software construction will only be adopted by mainstream software development organization when the overhead costs have been greatly reduced. Two approaches to cost mitigation are reuse (amortizing costs over many applications) and automation. For the last four years, NASA Ames has funded the Amphion project, whose objective is to automate software reuse through techniques from systematic software construction. In particular, deductive program synthesis (i.e., program extraction from proofs) is used to derive a composition of software components (e.g., subroutines) that correctly implements a specification. The construction of reuse libraries of software components is the standard software engineering solution for improving software development productivity and quality.
2015-06-01
public release; distribution is unlimited. The US Army Engineer Research and Development Center (ERDC) solves the nation’s toughest engineering and...Framework (PIAF) Timothy K. Perkins and Chris C. Rewerts Construction Engineering Research Laboratory U.S. Army Engineer Research and Development Center...Prepared for U.S. Army Corps of Engineers Washington, DC 20314-1000 Under Project P2 335530, “Cultural Reasoning and Ethnographic Analysis for the
23 CFR 924.11 - Implementation.
Code of Federal Regulations, 2013 CFR
2013-04-01
..., where applicable, for highway construction projects, 23 CFR part 172 for engineering and design services..., pavement markings, or installation of traffic signs, traffic lights, guardrails, impact attenuators... may amount up to 100 percent for projects for signing, pavement markings, active warning devices, and...
23 CFR 924.11 - Implementation.
Code of Federal Regulations, 2010 CFR
2010-04-01
..., where applicable, for highway construction projects, 23 CFR part 172 for engineering and design services..., pavement markings, or installation of traffic signs, traffic lights, guardrails, impact attenuators... may amount up to 100 percent for projects for signing, pavement markings, active warning devices, and...
23 CFR 924.11 - Implementation.
Code of Federal Regulations, 2011 CFR
2011-04-01
..., where applicable, for highway construction projects, 23 CFR part 172 for engineering and design services..., pavement markings, or installation of traffic signs, traffic lights, guardrails, impact attenuators... may amount up to 100 percent for projects for signing, pavement markings, active warning devices, and...
23 CFR 924.11 - Implementation.
Code of Federal Regulations, 2012 CFR
2012-04-01
..., where applicable, for highway construction projects, 23 CFR part 172 for engineering and design services..., pavement markings, or installation of traffic signs, traffic lights, guardrails, impact attenuators... may amount up to 100 percent for projects for signing, pavement markings, active warning devices, and...
23 CFR 924.11 - Implementation.
Code of Federal Regulations, 2014 CFR
2014-04-01
..., where applicable, for highway construction projects, 23 CFR part 172 for engineering and design services..., pavement markings, or installation of traffic signs, traffic lights, guardrails, impact attenuators... may amount up to 100 percent for projects for signing, pavement markings, active warning devices, and...
Electronic transport properties of single-wall boron nanotubes
NASA Astrophysics Data System (ADS)
Dai, Xinyue; Zhou, Yi; Li, Jie; Zhang, Lishu; Zhao, Zhenyang; Li, Hui
2017-08-01
Not Available Project supported by the National Natural Science Foundation of China (Grant No. 51671114) and the Special Funding in the Project of the Taishan Scholar Construction Engineering and National Key Research Program of China (Grant No. 2016YFB0300501).
33 CFR Appendix A to Part 230 - Processing Corps NEPA Documents
Code of Federal Regulations, 2010 CFR
2010-07-01
... Corps NEPA Documents NEFA documents for Civil Works activities other than permits will be processed in... Preconstruction Engineering, and Design, Construction, and Completed Projects in an Operations and Maintenance... reconnaissance phase, the district commander should undertake environmental studies along with engineering...
Independent technical review, handbook
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
Purpose Provide an independent engineering review of the major projects being funded by the Department of Energy, Office of Environmental Restoration and Waste Management. The independent engineering review will address questions of whether the engineering practice is sufficiently developed to a point where a major project can be executed without significant technical problems. The independent review will focus on questions related to: (1) Adequacy of development of the technical base of understanding; (2) Status of development and availability of technology among the various alternatives; (3) Status and availability of the industrial infrastructure to support project design, equipment fabrication, facility construction,more » and process and program/project operation; (4) Adequacy of the design effort to provide a sound foundation to support execution of project; (5) Ability of the organization to fully integrate the system, and direct, manage, and control the execution of a complex major project.« less
New business opportunity: Green field project with new technology
NASA Astrophysics Data System (ADS)
Lee, Seung Jae; Woo, Jong Hun; Shin, Jong Gye
2014-06-01
Since 2009 of global financial crisis, shipbuilding industry has undergone hard times seriously. After such a long depression, the latest global shipping market index shows that the economic recovery of global shipbuilding market is underway. Especially, nations with enormous resources are going to increase their productivity or expanding their shipyards to accommodate a large amount of orders expected in the near future. However, few commercial projects have been carried out for the practical shipyard layout designs even though those can be good commercial opportunities for shipbuilding engineers. Shipbuilding starts with a shipyard construction with a large scale investment initially. Shipyard design and the equipment layout problem, which is directly linked to the productivity of ship production, is an important issue in the production planning of mass production of ships. In many cases, shipbuilding yard design has relied on the experience of the internal engineer, resulting in sporadic and poorly organized processes. Consequently, economic losses and the trial and error involved in such a design process are inevitable problems. The starting point of shipyard construction is to design a shipyard layout. Four kinds of engineering parts required for the shipyard layout design and construction. Those are civil engineering, building engineering, utility engineering and production layout engineering. Among these parts, production layout engineering is most important because its result is used as a foundation of the other engineering parts, and also, determines the shipyard capacity in the shipyard lifecycle. In this paper, the background of shipbuilding industry is explained in terms of engineering works for the recognition of the macro trend. Nextly, preliminary design methods and related case study is introduced briefly by referencing the previous research. Lastly, the designed work of layout design is validated using the computer simulation technology.
Inspection of Construction Works According to Polish Construction Law
NASA Astrophysics Data System (ADS)
Czemplik, A.
2015-11-01
Construction regulations are still different in many European countries, even though the European Union directives have unified many acts for construction works and construction products in the member countries. The scheme of the construction process presented in the paper could be valid for most countries, despite of detailed regulations of legal systems. The number of construction regulations to be followed in order to get the Construction Permit in Poland is rather big, so the time between the start of the investment process and the day when the Construction Permit is issued could be several months. Only licensed professional engineers can play the role of site managers, site inspectors and designers, registered for the given construction project. Duties and responsibilities (civil liability) of these engineers are strictly defined by regulations. The obligatory inspection of construction works should be executed by the licensed site inspectors. Moreover, the works can be incidentally inspected by Authority, banks, insurance companies or designers. Foreign designers and foreign site engineers in order to be allowed by respective Authority to play official roles on Polish construction sites should present documents proving that they can do the same jobs in their countries as per regulations obligatory there.
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, September 1, 1943 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 6, view of construction downstream at STA. 152+50 - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, June 10, 1941 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 4, view of construction downstream at First Street Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
NASA Astrophysics Data System (ADS)
Skorupka, Dariusz; Duchaczek, Artur; Waniewska, Agnieszka; Kowacka, Magdalena
2017-07-01
Due to their properties unmanned aerial vehicles have huge number of possibilities for application in construction engineering. The nature and extent of construction works performedmakes the decision to purchase the right equipment significant for the possibility for its further use while monitoring the implementation of these works. Technical factors, such as the accuracy and quality of the applied measurement instruments are especially important when monitoring the realization of construction projects. The paper presents the optimization of the choice of unmanned aerial vehicles using the Bellinger method. The decision-making analysis takes into account criteria that are particularly crucial by virtue of the range of monitoring of ongoing construction works.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-15
... Pass Transmission, LLC, to construct, operate, maintain, and connect a new electric transmission line... Mountain National Forest, and the Army Corps of Engineers, New England District, are cooperating agencies... information on the Army Corps of Engineers' permit [[Page 21339
NASA Technical Reports Server (NTRS)
Su, Renjeng
1998-01-01
The Center for Space Construction (CSC) at University of Colorado at Boulder is one of eight University Space Engineering Research Centers established by NASA in 1988. The mission of the Center is to conduct research into space technology and to directly contribute to space engineering education. The Center reports to the Department of Aerospace Engineering Sciences and resides in the College of Engineering and Applied Sciences. The College has a long and successful track record of cultivating multi-disciplinary research and education programs. The Center for Space Construction represents prominent evidence of this record. The basic concept on which the Center was founded is the in-space construction of large space systems, such as space stations, interplanetary space vehicles, and extraterrestrial space structures. Since 1993, the scope of CSC research has evolved to include the design and construction of all spacecraft, large and small. With the broadened scope our research projects seek to impact the technological basis for spacecraft such as remote sensing satellites, communication satellites and other special-purpose spacecraft, as well as large space platforms. A summary of accomplishments, including student participation and degrees awarded, during the contract period is presented.
DCSC (Defense Construction Supply Center) Total Quality Management Master Plan
1989-07-01
job while allowing them to establish a better balance between work and personal needs. 29 TQM SHORT-MID-LONG RANGE INITIATIVES MID RANGE (3 YEARS...all performance standards. IMPROVE THE QUALITY OF WORKLIFE - Projects requiring engineering support throughout FY 90 and beyond are: Construction of
Merging the Internet and Hypermedia in the English Language Arts.
ERIC Educational Resources Information Center
Reed, W. Michael; Wells, John G.
1997-01-01
Discussion of hypermedia and computer-mediated communication focuses on a project that merges a language arts Internet resource with a hypermedia-based knowledge construction approach to learning. Highlights include constructing a HyperCard-based program on Shakespeare's "Hamlet," gophers and search engines, downloading, collaborative…
NASA Astrophysics Data System (ADS)
Claver, C. F.; Selvy, Brian M.; Angeli, George; Delgado, Francisco; Dubois-Felsmann, Gregory; Hascall, Patrick; Lotz, Paul; Marshall, Stuart; Schumacher, German; Sebag, Jacques
2014-08-01
The Large Synoptic Survey Telescope project was an early adopter of SysML and Model Based Systems Engineering practices. The LSST project began using MBSE for requirements engineering beginning in 2006 shortly after the initial release of the first SysML standard. Out of this early work the LSST's MBSE effort has grown to include system requirements, operational use cases, physical system definition, interfaces, and system states along with behavior sequences and activities. In this paper we describe our approach and methodology for cross-linking these system elements over the three classical systems engineering domains - requirement, functional and physical - into the LSST System Architecture model. We also show how this model is used as the central element to the overall project systems engineering effort. More recently we have begun to use the cross-linked modeled system architecture to develop and plan the system verification and test process. In presenting this work we also describe "lessons learned" from several missteps the project has had with MBSE. Lastly, we conclude by summarizing the overall status of the LSST's System Architecture model and our plans for the future as the LSST heads toward construction.
The Public Sector Construction Industry: Analysis of Single-Project Partnering
1992-12-22
thesis advisor, Dr. Fred Moavenzadeh for his guidance and encouragement. Colonel Larry S. Bonine , U.S. Army (Retired) and the members of his Partnering...PROJECT (CkG) ENGINEERS MANAGERS PR::JECT PARINERING TEAM Figure 4-4. Central Artery/Tunnel Organizational Chart. 116 MR. Larry Bonine an employee of the...joint venture team. MR. Bonine is an ex-Army Colonel and was the Corps District Engineer in Mobile, Alabama who oversaw the Oliver Lock and Dam and
Lee, Yoon-Kyung; Ryu, Joo-Hyung; Choi, Jong-Kuk; Lee, Seok; Woo, Han-Jun
2015-08-15
Spatial and temporal changes around an area of conventional coastal engineering can be easily observed from field surveys because of the clear cause-and-effect observable in the before and after stages of the project. However, it is more difficult to determine environmental changes in the vicinity of tidal flats and coastal areas that are a considerable distance from the project. To identify any unexpected environmental impacts of the construction of Saemangeum Dyke in the area, we examined morphological changes identified by satellite-based observations through a field survey on Gomso Bay tidal flats (15km from Saemangeum Dyke), and changes in the suspended sediment distribution identified by satellite-based observations through a hydrodynamic analysis in the Saemangeum and Gomso coastal area. We argue that hydrodynamic changes due to conventional coastal engineering can affect the sedimentation pattern in the vicinity of tidal flats. We suggest that the environmental impact assessment conducted before a conventional coastal engineering project should include a larger area than is currently considered. Copyright © 2015 Elsevier Ltd. All rights reserved.
Code JEF Facilities Engineering Home Page for the Internet
NASA Technical Reports Server (NTRS)
Mahaffey, Valerie A.; Harrison, Marla J. (Technical Monitor)
1995-01-01
There are always many activities going on in JEF. We work on and manage the Construction of Facilities (C of F) projects at NASA-Ames. We are constantly designing or analyzing a new facility or project, or a modification to an existing facility. Every day we answer numerous questions about engineering policy, codes and standards, we attend design reviews, we count dollars and we make sure that everything at the Center is designed and built according to good engineering judgment. In addition, we study literature and attend conferences to make sure that we keep current on new legislation and standards.
Port Granby Project Overview - 13208
DOE Office of Scientific and Technical Information (OSTI.GOV)
Smith, David W.; Vandergaast, Gary; Sungaila, Mark
2013-07-01
The Port Granby Project is an integral part of the Port Hope Area Initiative (PHAI), and is located approximately 14 kilometres west of the Municipality of Port Hope in the adjacent Municipality of Clarington, Ontario. The principal objective of the project is the excavation and relocation of low-level radioactive waste (LLRW) and marginally contaminated soils, which were deposited at the Port Granby Waste Management Facility (PGWMF) by Eldorado Nuclear Limited during the period 1955 to 1988, to a new, highly engineered above-ground Long-term Waste Management Facility (LTWMF) to be constructed on a nearby site. The Environmental Assessment for the Projectmore » was approved in 2009 August and the required Waste Nuclear Substance License was received in 2011 November. Once the detailed engineering design was completed, in 2011 March, the Port Granby Project was divided into three major contracts for construction implementation purposes. The first of these contracts was completed in late 2012 and the second is planned to start in early 2013. The contracting process for the third major contract is also expected to be completed during 2013. This paper provides an overview of the Port Granby Project as well as discussion on the status of the Project, including the regulatory approvals process, the approach to contracting the construction works and an update of work recently completed and soon to get underway. (authors)« less
26 CFR 1.925(a)-1T - Temporary regulations; transfer pricing rules for FSCs.
Code of Federal Regulations, 2013 CFR
2013-04-01
... paragraph. (D) Engineering or architectural services for construction projects located (or proposed for... this paragraph. (v) A special grouping rule applies to agricultural and horticultural products sold to... subdivision (i) of this paragraph does not apply. Income from the performance of engineering and architectural...
ERIC Educational Resources Information Center
Smith, Dwight; And Others
This instructional package is one of two designed for regular vocational students in the vocational area of building maintenance and engineering. The fifty-three learning modules are organized into ten units: office cleaning; grounds; sanitation; boiler maintenance and operation; power and hand tools; cabinet construction; repair of damaged…
33 CFR 263.20 - Program funding.
Code of Federal Regulations, 2010 CFR
2010-07-01
... authorities of this Program will be utilized by the Corps of Engineers in conducting studies approved by... grants of Program funds will be made to local interests for conducting studies or constructing projects... Engineer to proceed with a feasibility study, after submission of a DPR to OCE and approval of the Division...
33 CFR 263.20 - Program funding.
Code of Federal Regulations, 2011 CFR
2011-07-01
... authorities of this Program will be utilized by the Corps of Engineers in conducting studies approved by... grants of Program funds will be made to local interests for conducting studies or constructing projects... Engineer to proceed with a feasibility study, after submission of a DPR to OCE and approval of the Division...
Improving Collaborative Learning in Online Software Engineering Education
ERIC Educational Resources Information Center
Neill, Colin J.; DeFranco, Joanna F.; Sangwan, Raghvinder S.
2017-01-01
Team projects are commonplace in software engineering education. They address a key educational objective, provide students critical experience relevant to their future careers, allow instructors to set problems of greater scale and complexity than could be tackled individually, and are a vehicle for socially constructed learning. While all…
Tank waste remediation system configuration management implementation plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vann, J.M.
1998-03-31
The Tank Waste Remediation System (TWRS) Configuration Management Implementation Plan describes the actions that will be taken by Project Hanford Management Contract Team to implement the TWRS Configuration Management program defined in HNF 1900, TWRS Configuration Management Plan. Over the next 25 years, the TWRS Project will transition from a safe storage mission to an aggressive retrieval, storage, and disposal mission in which substantial Engineering, Construction, and Operations activities must be performed. This mission, as defined, will require a consolidated configuration management approach to engineering, design, construction, as-building, and operating in accordance with the technical baselines that emerge from themore » life cycles. This Configuration Management Implementation Plan addresses the actions that will be taken to strengthen the TWRS Configuration Management program.« less
School Building Projects: Managing Insurance and Contracts during Construction
ERIC Educational Resources Information Center
Shands, Richard
2011-01-01
Managing the risks inherent in a building project presents a challenge and opportunities not often encountered in the ordinary affairs of a school district. A building project brings the district, its staff, and students, as well as the community, in close contact with architects and engineers and a number of contractors for a period of time often…
A Mission in the Desert: Albuquerque District, 1935-1985
1985-01-01
Engineers came into New Mexico in 1935 to construct its first project near Tucumcari, the Engineers began to develop a knowledge of the political...agency, as a local unit of the federal gov- ernment in cases of civil emergency, and as a source of engineering knowledge for Southwest engineering...the magnitude of this book could reach completion without the involvement of many people at every stage of development. The assistance and knowledge
Research on the Investment Costs of IT Project
NASA Astrophysics Data System (ADS)
Zurong, Chen; Feng, Jingchun
2018-02-01
The investment costs of IT project are the basis of IT project management. The meaning and composition of the investment costs of IT project were analyzed in this paper, which involving the engineering cost of IT project, the other costs of IT project, reserve cost and financing interest of the construction period. On this basis, the composition and content of static investment costs and dynamic investment costs of IT project were also studied in the paper.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Willenbrock, J.H.; Thomas, H.R. Jr.; Burati, J.J. Jr.
1978-12-01
A summary of two reports, COO/4120-1 and COO/4120-2, is given. A comparative analysis was made of the Quality Assurance practices related to the structural concrete phase on nine nuclear and three fossil fuel power plant projects which are (or have been) under construction in the United States in the past ten years. For the nuclear projects the analysis identified the response of each Quality Assurance program to the applicable criteria of 10 CFR Part 50, Appendix B as well as to the pertinent regulatory requirements and industry standards. For the fossil projects the analysis identified the response of each Qualitymore » Assurance program to criteria similar to those which were applicable in the nuclear situation. The major emphasis was placed on the construction aspects of the structural concrete phase of each project. The engineering and design aspects were examined whenever they interfaced with the construction aspects.« less
ERIC Educational Resources Information Center
Misfeldt, Morten
2015-01-01
In this paper I describe how students use a project management simulation game based on an attack-defense mechanism where two teams of players compete by challenging each other's projects. The project management simulation game is intended to be played by pre-service construction workers and engineers. The gameplay has two parts: a planning part,…
NASA Technical Reports Server (NTRS)
2002-01-01
Ames Research Center granted Reality Capture Technologies (RCT), Inc., a license to further develop NASA's Mars Map software platform. The company incorporated NASA#s innovation into software that uses the Virtual Plant Model (VPM)(TM) to structure, modify, and implement the construction sites of industrial facilities, as well as develop, validate, and train operators on procedures. The VPM orchestrates the exchange of information between engineering, production, and business transaction systems. This enables users to simulate, control, and optimize work processes while increasing the reliability of critical business decisions. Engineers can complete the construction process and test various aspects of it in virtual reality before building the actual structure. With virtual access to and simulation of the construction site, project personnel can manage, access control, and respond to changes on complex constructions more effectively. Engineers can also create operating procedures, training, and documentation. Virtual Plant Model(TM) is a trademark of Reality Capture Technologies, Inc.
42 CFR 137.304 - May Self-Governance Tribes buy back environmental services from the IHS?
Code of Federal Regulations, 2010 CFR
2010-10-01
... project agreement, including design and construction engineering, and environmental compliance services... 42 Public Health 1 2010-10-01 2010-10-01 false May Self-Governance Tribes buy back environmental...-GOVERNANCE Construction Nepa Process § 137.304 May Self-Governance Tribes buy back environmental services...
133. Photocopy of original construction drawing, dated 21 March 1940 ...
133. Photocopy of original construction drawing, dated 21 March 1940 (Original print in the possession of U.S. Army Corps of Engineers, Portland District, Portland, OR.) (P-40-8) TYPICAL PIER ELEVATION. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR
NASA Technical Reports Server (NTRS)
Andrews, E. H., Jr.; Mackley, E. A.
1976-01-01
The NASA Hypersonic Research Engine Project was undertaken to design, develop, and construct a hypersonic research ramjet engine for high performance and to flight test the developed concept on the X-15-2A airplane over the speed range from Mach 3 to 8. Computer program results are presented here for the Mach 7 component integration and performance tests.
Barbosa, Lidiany Silva
2011-01-01
The article analyzes the role played by engineers in the construction of road infrastructure in Minas Gerais between the 1840s and 1880s. Building and providing regular maintenance for roads and bridges was a task carried out by the Minas Gerais provincial government, which since the 1830s had a specific agency assigned to designing, building, and maintaining public communication routes. Engineers were part of the agency from its inception, playing a significant role in designing projects and in the actual execution of certain works. The current study is grounded in administrative documentation in which the details of work progress are reported to the provincial government. The gathered records provide technical, administrative, and financial information, along with data on labor power and the agents engaged in construction works.
Design and application of BIM based digital sand table for construction management
NASA Astrophysics Data System (ADS)
Fuquan, JI; Jianqiang, LI; Weijia, LIU
2018-05-01
This paper explores the design and application of BIM based digital sand table for construction management. Aiming at the demands and features of construction management plan for bridge and tunnel engineering, the key functional features of digital sand table should include three-dimensional GIS, model navigation, virtual simulation, information layers, and data exchange, etc. That involving the technology of 3D visualization and 4D virtual simulation of BIM, breakdown structure of BIM model and project data, multi-dimensional information layers, and multi-source data acquisition and interaction. Totally, the digital sand table is a visual and virtual engineering information integrated terminal, under the unified data standard system. Also, the applications shall contain visual constructing scheme, virtual constructing schedule, and monitoring of construction, etc. Finally, the applicability of several basic software to the digital sand table is analyzed.
3. Photographic copy of roof truss construction details for Building ...
3. Photographic copy of roof truss construction details for Building 4505, Taylor & Barnes, Architects & Engineers, 803 W. Third Street, Los Angeles California, O.C.E. Office of Civil Engineer Job No. A(9-10), Military Construction: Materiel Command Flight Test Base, Muroc, California, Hangar and Auxiliary Buildings: Hangar Type P-A, Detail of Trusses T-2, T-3, T-4, T-5 & T6, Sheet No. 9, March 1944. A similar drawing for truss T-l is included in project field notes. Reproduced from the holdings of the National Archives, Pacific Southwest Region - Edwards Air Force Base, North Base, Hangar, End of North Base Road, Boron, Kern County, CA
Green Construction Initiatives in Overseas Contingency Operations
2011-04-28
his recent deployment. 38 As the SOCCENT engineer, Lt Col Dwyer was responsible for O &M scope construction projects across the Middle East. He...construction, or Operations ·and Maintenance ( O &M) construction. Also in this section, I will explain applicabre sections of the governing documents...To my Pentagon friends and bosses: Colonel Beth Brown, Lieutenant Colonel Rick "Steve" Dwyer , Tom "PDT" Lowry and Major Todd Graham; thanks for
Modeling Manpower and Equipment Productivity in Tall Building Construction Projects
NASA Astrophysics Data System (ADS)
Mudumbai Krishnaswamy, Parthasarathy; Rajiah, Murugasan; Vasan, Ramya
2017-12-01
Tall building construction projects involve two critical resources of manpower and equipment. Their usage, however, widely varies due to several factors affecting their productivity. Currently, no systematic study for estimating and increasing their productivity is available. What is prevalent is the use of empirical data, experience of similar projects and assumptions. As tall building projects are here to stay and increase, to meet the emerging demands in ever shrinking urban spaces, it is imperative to explore ways and means of scientific productivity models for basic construction activities: concrete, reinforcement, formwork, block work and plastering for the input of specific resources in a mixed environment of manpower and equipment usage. Data pertaining to 72 tall building projects in India were collected and analyzed. Then, suitable productivity estimation models were developed using multiple linear regression analysis and validated using independent field data. It is hoped that the models developed in the study will be useful for quantity surveyors, cost engineers and project managers to estimate productivity of resources in tall building projects.
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, June 7, 1940 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 2, view of left bank in construction, looking downstream from RB STA. 63+75 - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, September 4, 1940 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 4, view of water line construction upstream at Walnut Street Bridgeupstream from point stadium - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
10 CFR 960.5-2-4 - Offsite installations and operations.
Code of Federal Regulations, 2014 CFR
2014-01-01
... present projected effects from nearby industrial, transportation, and military installations and..., construction, operation, closure, or decommissioning or can be accommodated by engineering measures and (2...
10 CFR 960.5-2-4 - Offsite installations and operations.
Code of Federal Regulations, 2012 CFR
2012-01-01
... present projected effects from nearby industrial, transportation, and military installations and..., construction, operation, closure, or decommissioning or can be accommodated by engineering measures and (2...
10 CFR 960.5-2-4 - Offsite installations and operations.
Code of Federal Regulations, 2011 CFR
2011-01-01
... present projected effects from nearby industrial, transportation, and military installations and..., construction, operation, closure, or decommissioning or can be accommodated by engineering measures and (2...
10 CFR 960.5-2-4 - Offsite installations and operations.
Code of Federal Regulations, 2013 CFR
2013-01-01
... present projected effects from nearby industrial, transportation, and military installations and..., construction, operation, closure, or decommissioning or can be accommodated by engineering measures and (2...
25 CFR 900.110 - What does this subpart cover?
Code of Federal Regulations, 2010 CFR
2010-04-01
... HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT... contracts under this subpart are: design and architectural/engineering services, construction project...
Workforce Development Analysis | Energy Analysis | NREL
with customer service, construction, and electrical projects One-half of surveyed firms reported , training, and experience that will enable continued large-scale deployment of wind and solar technologies engineers; and project managers. Standardized education and training at all levels-primary school through
REDUCTION OF USE OF PETROLEUM ENERGY RESOURCES BY CONVERSION OF WASTE COOKING OILS INTO DIESEL FUEL
This project has a dual objective of providing hands-on experience to undergraduate engineering students and producing biodiesel fuel from a used cooking oil feedstock. The project consists of three phases: Phase I - process development and construction of a pilot plant; Phase...
ERIC Educational Resources Information Center
Steinberg, Alan; And Others
This instructional package is one of three designed for educable mentally impaired students in the vocational area of building maintenance and engineering. The thirty-one learning modules are organized into nine units: grounds; sanitation; boiler maintenance and operation; power and hand tools; cabinet construction; repair of damaged furniture;…
Value Engineering. Technical Manual. School Facilities Development Procedures Manual.
ERIC Educational Resources Information Center
Washington Office of the State Superintendent of Public Instruction, Olympia.
Value Engineering (VE) is a cost-optimizing technique used to analyze design quality and cost-effectiveness. The application of VE procedures to the design and construction of school facilities has been adopted by the state of Washington. This technical manual provides guidance in developing the scope and applicability of VE to school projects; in…
Navy Medicine. Volume 102, No. 4, Fall 2010
2010-01-01
5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS...dental assistance to more than 4,000 Panama- nian citizens, immunized more than 800 animals and continued work on construction projects in local...patients, performed 859 surger- ies, issued 60,883 glasses, completed 22 engineering projects , participated in 86 community service projects (COM
33 CFR 323.3 - Discharges requiring permits.
Code of Federal Regulations, 2010 CFR
2010-07-01
... procedures of these regulations. Agreement for construction or engineering services performed for other... limited to, the following: Projects where the pilings are so closely spaced that sedimentation rates would...
33 CFR 323.3 - Discharges requiring permits.
Code of Federal Regulations, 2011 CFR
2011-07-01
... procedures of these regulations. Agreement for construction or engineering services performed for other... limited to, the following: Projects where the pilings are so closely spaced that sedimentation rates would...
114. Photocopy of original construction drawing, 14 August 1935. (Original ...
114. Photocopy of original construction drawing, 14 August 1935. (Original print in the possession of U.S. Army Corps of Engineers, Portland District, Portland, OR.) (M-5-8, Sheet No. 14) SPILLWAY DAM FISHWAY ENTRANCE BAY DIFFUSION CHAMBER BEAN DETAILS. - Bonneville Project, Bonneville Dam, Columbia River, Bonneville, Multnomah County, OR
106. Photocopy of original construction drawing, dated 7 December 1934 ...
106. Photocopy of original construction drawing, dated 7 December 1934 (Original print in the possession of U.S. Army Corps of Engineers, Portland District, Portland, OR.) (P-5-311) POWERHOUSE, 60,000 H.P DRAFT TUBE DESIGN. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR
A3 TEST STAND DEVELOPMENT AND CONSTRUCTION
NASA Technical Reports Server (NTRS)
2008-01-01
THIS IMAGE DOCUMENTS THE DEVELOPMENT AND CONSTRUCTION OF THE A3 TEST STAND IN SUPPORT OF THE ARES/CLV UPPER STAGE ENGINE DEVELOPMENT AT STENNIS SPACE CENTER, MISSIPPI IN SUPPORT OF THE DEVELOPMENT OF THE CONSTELLATION/ARES PROJECT. THIS IMAGE IS EXTRACTED FROM A HIGH DEFINITION VIDEO FILE AND IS THE HIGHEST RESOLUTION AVAILABLE
109. Photocopy of original construction drawing, dated 10 January 1935 ...
109. Photocopy of original construction drawing, dated 10 January 1935 (Original print in the possession of U.S. Army Corps of Engineers, Portland District, Portland, OR.) (T-3-7) POWERHOUSE FISHWAY, GENERAL ARRANGEMENT DIFFUSING CHAMBER UNDER ICE SLUICE. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR
NASA Astrophysics Data System (ADS)
Adeleke, Adeyinka
The construction project in the oil and gas industry covers the entire spectrum of hydrocarbon production from the wellhead (upstream) to downstream facilities. In each of these establishments, the activities in a construction project include: consulting, studies, front-end engineering, detail engineering, procurement, program management, construction, installation, commissioning and start-up. Efficient management of each of the activities involved in construction projects is one of the driving forces for the successful completion of the project. Optimizing the crucial factors in project management during each phase of a project in an oil and gas industry can assist managers to maximize the use of available resources and drive the project to successful conclusions. One of these factors is the decision-making process in the construction project. Current research effort investigated the relationship between decision-making processes and business strategy in oil and gas industry using employee surveys. I recruited employees of different races, age group, genders, and years of experience in order understand their influence on the implementation of the decision-making process in oil and gas industry through a quantitative survey. Decision-making was assessed using five decision measures: (a) rational, (b) intuitive, (c) dependent, (d) avoidant, and (e) spontaneous. The findings indicated gender, age, years of work experience and job titles as primary variables with a negative relationship with decision-making approach for employees working in a major oil and gas industry. The study results revealed that the two most likely decision-making methods in oil and gas industry include: making a decision in a logical and systematic way and seek assistance from others when making a decision. Additionally, the two leading management approaches to decision-making in the oil and gas industry include: decision analysis is part of organization culture and management is committed to the decision-making process. Some recommendations for future studies were presented based on the need to intensify the importance of the current study and enlarge the body of knowledge regarding decision-making process in oil and gas industry.
Research on construction quality and improvement of assembly construction
NASA Astrophysics Data System (ADS)
Cheng, Fei
2017-11-01
Based on the acceleration of the urbanization process and the improvement of the quality of life of our residents, the demand for building construction has been increasing. In this context, the construction industry in order to promote the construction efficiency, quality improvement, to meet the needs of the development of the times to strengthen the new technology, the use of new technologies. At present, China’s engineering construction units in the process of carrying out the project to strengthen the use of assembly-type construction technology, which thus achieved for the traditional construction work low-level, high time-consuming issues, and promote the steady improvement of production efficiency. Based on this, this paper focuses on the analysis of the connotation of the assembly structure and analyzes the quality problems in the construction process of the construction projects and puts forward the improvement measures to promote the improvement of the building quality and the construction of the building Construction speed. Based on this, this paper analyzes the structural system and design of prefabricated building.
Linshiz, Gregory; Goldberg, Alex; Konry, Tania; Hillson, Nathan J
2012-01-01
Synthetic biology is a nascent field that emerged in earnest only around the turn of the millennium. It aims to engineer new biological systems and impart new biological functionality, often through genetic modifications. The design and construction of new biological systems is a complex, multistep process, requiring multidisciplinary collaborative efforts from "fusion" scientists who have formal training in computer science or engineering, as well as hands-on biological expertise. The public has high expectations for synthetic biology and eagerly anticipates the development of solutions to the major challenges facing humanity. This article discusses laboratory practices and the conduct of research in synthetic biology. It argues that the fusion science approach, which integrates biology with computer science and engineering best practices, including standardization, process optimization, computer-aided design and laboratory automation, miniaturization, and systematic management, will increase the predictability and reproducibility of experiments and lead to breakthroughs in the construction of new biological systems. The article also discusses several successful fusion projects, including the development of software tools for DNA construction design automation, recursive DNA construction, and the development of integrated microfluidics systems.
Ansari, Ali Uddin; Jafari, Ashfaque; Mirzana, Ishrat Meera; Imtiaz, Zulfia; Lukacs, Heather
2003-07-01
A recent initiative at Muffakham Jah College of Engineering and Technology, Hyderabad, India, has resulted in setting up a program called Centre for Environment Studies and Socioresponsive Engineering which seeks to involve undergraduate students in studying and solving environmental problems in and around the city of Hyderabad, India. Two pilot projects have been undertaken--one focusing on design and construction of an eco-friendly house, The Natural House, and another directed at improving environmental and general living conditions in a slum area. The paper describes our attempts and experience of motivating our students to take interest in such projects. In an interesting development we invited a member of a student-faculty team at Massachusetts Institute of Technology (M.I.T.) that is doing a project in Nepal on safe drinking water. We report in our paper how the presentation by the guest from M.I.T. served as a catalyst for generating interest among civil and mechanical engineering students in our own projects. The paper includes contributions from one of our students and the M.I.T. staff member, reporting on their experiences related to the slum development project. We also discuss the Natural House project and its international and educational significance as a means of inculcating sensitivity and interest in nature among engineering students. We propose a pledge for engineers similar to the Hippocratic Oath for medical professionals.
NASA Astrophysics Data System (ADS)
1981-09-01
The estimated plant capital cost for a coal fired 200 MWE electric generating plant with open cycle magnetohydrodynamics is divided into principal accounts based on Federal Energy Regulatory Commision account structure. Each principal account is defined and its estimated cost subdivided into identifiable and major equipment systems. The cost data sources for compiling the estimates, cost parameters, allotments, assumptions, and contingencies, are discussed. Uncertainties associated with developing the costs are quantified to show the confidence level acquired. Guidelines established in preparing the estimated costs are included. Based on an overall milestone schedule related to conventional power plant scheduling experience and starting procurement of MHD components during the preliminary design phase there is a 6 1/2-year construction period. The duration of the project from start to commercial operation is 79 months. The engineering phase of the project is 4 1/2 years; the construction duration following the start of the man power block is 37 months.
NASA Technical Reports Server (NTRS)
1981-01-01
The estimated plant capital cost for a coal fired 200 MWE electric generating plant with open cycle magnetohydrodynamics is divided into principal accounts based on Federal Energy Regulatory Commision account structure. Each principal account is defined and its estimated cost subdivided into identifiable and major equipment systems. The cost data sources for compiling the estimates, cost parameters, allotments, assumptions, and contingencies, are discussed. Uncertainties associated with developing the costs are quantified to show the confidence level acquired. Guidelines established in preparing the estimated costs are included. Based on an overall milestone schedule related to conventional power plant scheduling experience and starting procurement of MHD components during the preliminary design phase there is a 6 1/2-year construction period. The duration of the project from start to commercial operation is 79 months. The engineering phase of the project is 4 1/2 years; the construction duration following the start of the man power block is 37 months.
NASA Astrophysics Data System (ADS)
Slagle, James H.; Hill, John M.; Davison, Warren B.; Hart, Wood; Teran, Jose U.
1998-08-01
Planning, estimating, and building a telescope and its enclosure within a budget is a challenge to any project staff. The Large Binocular Telescope (LBT) project office goal has been to break every phase of the project into small packages and competitively bid the packages. In this way the project office can minimize costs and keep the project budget from escalating out of control. This paper will discuss both the unique and common problems associated with the building of telescopes into the next millennium. The discussion is centered on the planning and execution phases of construction for the LBT, located on Mt. Graham in Arizona. The paper will discuss the effects of delays on the actual start of the telescope due to environmental issues and the impact the delays had on design and budget. The paper will provide the solutions that have been incorporated by the LBT project office to maximize the quality of construction while holding costs to a minimum. The use of a team approach by the contractors, engineers, and the project office has been successful in maintaining quality construction at a reasonable cost.
NASA Astrophysics Data System (ADS)
Xu, Yishen; Wu, Di; Chen, Daqing; Gu, Jihua; Gao, Lei
2017-08-01
According to the inherent requirements of education for talents' knowledge, quality and comprehensive ability and the major training goals of optoelectronics information science and engineering, in order to enhance the undergraduates' comprehensive practical ability and consciousness of innovation, we carried out the reforms of teaching method and teaching mode, which took the training programs of innovation and entrepreneurship for undergraduates, extracurricular academic research fund, "Chun-Tsung Scholar" program or research projects of their tutors as the guidance, and took the all levels of relevant discipline competitions as the promotion. And the training mainline of engineering innovation talents as "undergraduate's tutorial system ->innovative training program or tutor's research project ->academic competition ->graduation projects (thesis)" was constructed stage by stage by combining the undergraduates' graduation projects and their participated academic competition into one for improving the quality of the graduation projects (thesis). The practical results of the last several years illuminate that the proposed training model can effectively stimulate the students' awareness of autonomous learning, enhance their comprehensive ability of analyzing and solving problems and improve their ability of engineering practice and innovation as well as their teamwork spirit.
2017-03-01
address challenges in managing projects to build medical facilities. In response to statutory requirements and additional congressional direction, VA...is outsourcing management of certain such projects to the U.S. Army Corps of Engineers (USACE). As of October 2016, VA had 23 ongoing projects...costing $100 million or more. VA and USACE have entered into interagency agreements for 12 of these 23 projects. The agreements entail USACE’s managing
Gendered Transitions, Career Identities and Possible Selves: The Case of Engineering Graduates
ERIC Educational Resources Information Center
Papafilippou, Vanda; Bentley, Laura
2017-01-01
This article, drawing upon the Paired Peers project, a longitudinal qualitative study (n = 90), examines how seven UK engineering graduates, four women and three men, construct their career identities during the transitionary period from university to work. It explores how gender and the occupational cultures that reside within the sector, and the…
ERIC Educational Resources Information Center
Blanchard, Margaret; Sharp, Jennifer; Grable, Lisa
2009-01-01
As part of the "Car Lab Project," students constructed rubber band cars, raced them, and worked through a number of automotive activities. The students engaged in this project certainly had fun, but they also used high-tech gear such as motion sensors and graphing calculators to gather data on the distance and time cars traveled and to generate…
2013-12-01
such poor condition that it had to have major rehabilitation work performed. Work to fix the deteriorated tunnel cost $10 million more than had...originally been estimated.19 Corps officials on the Little Calumet project said during construction they encountered a former landfill along one portion
Reducing construction waste: A study of urban infrastructure projects.
de Magalhães, Ruane Fernandes; Danilevicz, Ângela de Moura Ferreira; Saurin, Tarcisio Abreu
2017-09-01
The construction industry is well-known for producing waste detrimental to the environment, and its impacts have increased with the development process of cities. Although there are several studies focused on the environmental impact of residential and commercial buildings, less knowledge is available regarding decreasing construction waste (CW) generation in urban infrastructure projects. This study presents best practices to reduce waste in the said projects, stressing the role of decision-making in the design stage and the effective management of construction processes in public sector. The best practices were identified from literature review, document analysis in 14 projects of urban infrastructure, and both qualitative and quantitative survey with 18 experts (architects and engineers) playing different roles on those projects. The contributions of these research are: (i) the identification of the main building techniques related to the urban design typologies analyzed; (ii) the identification of cause-effect relationships between the design choices and the CW generation diagnosis; (iii) the proposal of a checklist to support the decision-making process, that can be used as a control and evaluation instrument when developing urban infrastructure designs, focused on the construction waste minimization (CWM). Copyright © 2017 Elsevier Ltd. All rights reserved.
Methodology for quantification of waste generated in Spanish railway construction works.
de Guzmán Báez, Ana; Villoria Sáez, Paola; del Río Merino, Mercedes; García Navarro, Justo
2012-05-01
In the last years, the European Union (EU) has been focused on the reduction of construction and demolition (C&D) waste. Specifically, in 2006, Spain generated roughly 47million tons of C&D waste, of which only 13.6% was recycled. This situation has lead to the drawing up of many regulations on C&D waste during the past years forcing EU countries to include new measures for waste prevention and recycling. Among these measures, the mandatory obligation to quantify the C&D waste expected to be originated during a construction project is mandated. However, limited data is available on civil engineering projects. Therefore, the aim of this research study is to improve C&D waste management in railway projects, by developing a model for C&D waste quantification. For this purpose, we develop two equations which estimate in advance the amount, both in weight and volume, of the C&D waste likely to be generated in railway construction projects, including the category of C&D waste generated for the entire project. Copyright © 2012 Elsevier Ltd. All rights reserved.
Environmental Assessment Construction of a New Hazardous Cargo Pad Davis-Monthan AFB
2002-11-07
PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) 355th Civil Engineer Squadron (CES/CEVA),710 Third Street,Davis-Monthan AFB,AZ,85707 8. PERFORMING...agency for certain projects. Details of the preparation of this EA are mandated by the Council of Enviromental Quality (CEQ) in the series of...Base, Tucson, Arizona." October 1996. James M. Montgomery, Consulting Engineers for US army Corps of Engineers , Omaha Dist., Apri11990
NASA Technical Reports Server (NTRS)
Cox, Rachel
2017-01-01
PowerPoint presentation for the Society of Women Engineers presented by Rachel Cox to give an overview of NASA Swamp Works, the kind of work we do, explain what ISRU (living off the land in space) is about, and highlight several projects. Projects include RASSOR the space mining robot, Resource Prospector, ALTIP, Marco Polo, and regolith construction, including heat shields and 3D printing. Content is similar to what is presented on Swamp Works tours (we get about 2,000 visitors a year) and is high level and conceptual in nature (no engineering specsdimensions.)
2016-12-01
Kamojjala, 2014, “Real-Time M0deling of Water Distribution Systems: A Case Study ,” Journal AWWA, Vol. 106, No. 9 (September 2014.) Feinauer, Lynn R...Quality and Corrosion in Water-Distribution Systems Final Report on Project F07-AR05 Co ns tr uc tio n En gi ne er in g R es ea rc h La bo ra to...Final Report on Project F07-AR05 Vicki L. Van Blaricum Construction Engineering Research Laboratory U.S. Army Engineer Research and Development Center
Stereoscopic applications for design visualization
NASA Astrophysics Data System (ADS)
Gilson, Kevin J.
2007-02-01
Advances in display technology and 3D design visualization applications have made real-time stereoscopic visualization of architectural and engineering projects a reality. Parsons Brinkerhoff (PB) is a transportation consulting firm that has used digital visualization tools from their inception and has helped pioneer the application of those tools to large scale infrastructure projects. PB is one of the first Architecture/Engineering/Construction (AEC) firms to implement a CAVE- an immersive presentation environment that includes stereoscopic rear-projection capability. The firm also employs a portable stereoscopic front-projection system, and shutter-glass systems for smaller groups. PB is using commercial real-time 3D applications in combination with traditional 3D modeling programs to visualize and present large AEC projects to planners, clients and decision makers in stereo. These presentations create more immersive and spatially realistic presentations of the proposed designs. This paper will present the basic display tools and applications, and the 3D modeling techniques PB is using to produce interactive stereoscopic content. The paper will discuss several architectural and engineering design visualizations we have produced.
Low-Cost In-Fill Installation for High-Energy-Saving, Dynamic Windows
2017-07-01
greenhouse gas, HVAC, low emissivity, military construction, photovoltaic, physical vapor deposition, solar heat gain coefficient... Physical vapor deposition ROICC Resident Officer In Charge of Construction SHGC Solar heat gain coefficient S/RM Sustainment, Restoration, and...PERMITS AND REGULATIONS Regulations - The demonstration project planning and implementation followed US Army Corps of Engineers Safety and Health
111. Photocopy of original construction drawing, dated 31 January 1935 ...
111. Photocopy of original construction drawing, dated 31 January 1935 (Original print in the possession of U.S. Army Corps of Engineers, Portland District, Portland, OR.) (T-1-28) PROPOSED MODEL OF DIFFUSING CHAMBERS AND GRATINGS FOR POWERHOUSE FISHWAY AND FISH LADDERS. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR
Good Guys and "Bad" Girls: Gendered Identity Construction in a Writing Workshop.
ERIC Educational Resources Information Center
Orellana, Marjorie Faulstich
As part of a larger ethnographic project addressing the construction of gender through literacy, this study focused on understanding how the children in one writing process classroom expressed their social selves in their written compositions, as well as how those compositions were engineered within the social dynamics of the classroom. The study…
ERIC Educational Resources Information Center
Sacristán, Ana Isabel; Pretelín-Ricárdez, Angel
2017-01-01
This work is part of a research project that aims to enhance engineering students' learning of how to apply mathematics in modelling activities of real-world situations, through the construction (design and programming) of videogames. We want also for students to relate their mathematical knowledge with other disciplines (e.g., physics, computer…
Study on Construction Technology of Municipal Road and Bridge Concrete
NASA Astrophysics Data System (ADS)
Tang, Fuyong
2018-03-01
With the continuous development of social economy and the accelerating process of urbanization, municipal road and bridge projects have also shown a trend of rapid development. Municipal road and bridge work can fully reflect the economic and cultural development level of cities and is also an important symbol of urban development. As a basic material of construction, concrete is widely used in engineering construction. This article will analyze the municipal road and bridge concrete construction technology, put forward corresponding measures.
Development of high-rise buildings: digitalization of life cycle management
NASA Astrophysics Data System (ADS)
Gusakova, Elena
2018-03-01
The analysis of the accumulated long-term experience in the construction and operation of high-rise buildings reveals not only the engineering specificity of such projects, but also systemic problems in the field of project management. Most of the project decisions are made by the developer and the investor in the early stages of the life cycle - from the acquisition of the site to the start of operation, so most of the participants in the construction and operation of the high-rise building are far from the strategic life-cycle management of the project. The solution of these tasks due to the informatization of management has largely exhausted its efficiency resource. This is due to the fact that the applied IT-systems automated traditional "inherited" processes and management structures, and, in addition, they were focused on informatization of the activities of the construction company, rather than the construction project. Therefore, in the development of high-rise buildings, the tasks of researching approaches and methods for managing the full life cycle of projects that will improve their competitiveness become topical. For this purpose, the article substantiates the most promising approaches and methods of informational modeling of high-rise construction as a basis for managing the full life cycle of this project. Reengineering of information interaction schemes for project participants is considered; formation of a unified digital environment for the life cycle of the project; the development of systems for integrating data management and project management.
GREEN OAK AS A SUSTAINABLE BUILDING MATERIAL
Technical documentation necessary for a project demonstrating the viability of green oak as a contemporary structural material. These will include material grading guidelines, mechanical testing, architectural construction documents and details, specifications, engineering cal...
Code of Federal Regulations, 2010 CFR
2010-04-01
... implementation grant includes the eligible activities of acquisition, architectural and engineering fees, construction, rehabilitation, operating costs or replacement reserves of transitional housing units, and where...
Concentrating Solar Power Projects | Concentrating Solar Power | NREL
construction, or under development. CSP technologies include parabolic trough, linear Fresnel reflector, power Technology-listing by parabolic trough, linear Fresnel reflector, power tower, or dish/engine systems Status
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1981-03-01
The construction and operation of a 14,980,000 gallon per year fuel ethanol from grain refinery in the Imperial Valley of California is proposed. The Imperial Valley Ethanol Refinery (refinery) will use hot geothermal fluid from geothermal resources at the East Mesa area as the source of process energy. In order to evaluate the economic viability of the proposed Project, exhaustive engineering, cost analysis, and financial studies have been undertaken. This report presents the results of feasibility studies undertaken in geothermal resource, engineering, marketing financing, management, environment, and permits and approvals. The conclusion of these studies is that the Project ismore » economically viable. US Alcohol Fuels is proceeding with its plans to construct and operate the Refinery.« less
HSTDEK: Developing a methodology for construction of large-scale, multi-use knowledge bases
NASA Technical Reports Server (NTRS)
Freeman, Michael S.
1987-01-01
The primary research objectives of the Hubble Space Telescope Design/Engineering Knowledgebase (HSTDEK) are to develop a methodology for constructing and maintaining large scale knowledge bases which can be used to support multiple applications. To insure the validity of its results, this research is being persued in the context of a real world system, the Hubble Space Telescope. The HSTDEK objectives are described in detail. The history and motivation of the project are briefly described. The technical challenges faced by the project are outlined.
NASA Technical Reports Server (NTRS)
1978-01-01
The building in the top photo is the new home of the National Permanent Savings Bank in Washington, D.C., designed by Hartman-Cox Architects. Its construction was based on a money-saving method of preparing building specifications which derived from NASA technology developed to obtain quality construction while holding down cost of launch facilities, test centers and other structures. Written technical specifications spell out materials and components to be used on construction projects and identify the quality tests each item must pass. Specifications can have major impact on construction costs. Poorly formulated specifications can lead to unacceptable construction which must be replaced, unnecessarily high materials costs, safety hazards, disputes and often additional costs due to delays and litigation. NASA's Langley Research Center developed a novel approach to providing accurate, uniform, cost-effective specifications which can be readily updated to incorporate new building technologies. Called SPECSINTACT, it is a computerized - system accessible to all NASA centers involved in construction programs. The system contains a comprehensive catalog of master specifications applicable to many types of construction. It enables designers of any structure to call out relevant sections from computer storage and modify them to fit the needs of the project at hand. Architects and engineers can save time by concentrating their efforts on needed modifications rather than developing all specifications from scratch. Successful use of SPECSINTACT has led to a number of spinoff systems. One of the first was MASTERSPEC, developed from NASA's experience by Production Systems for Architects and Engineers, Inc., an organization established by the American Institute of Architects. MASTERSPEC, used in construction of the bank building pictured, follows the same basic format as SPECSINTACT and can be used in either automated or manual modes. The striking appearance of the bank building shows that, while MASTERSPEC saves time and money, its use involves no sacrfice in architectural design freedom. The Naval Engineering Facilities Command employs an automated specifications system based on SPECSINTACT. The Public Buildings Service of the General Services Administration used SPECSINTACT as a starting point in a plan to make its guideline specifications available to architects and engineers on a nationwide computer network. Public Technology, Inc., a NASA Technology Application Team, is working with Production Systems for Architects and Engineers, Inc., to promote widespread use of the system by state and local governments for cost benefits to taxpayers.
Wind Energy Workforce Development: Engineering, Science, & Technology
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lesieutre, George A.; Stewart, Susan W.; Bridgen, Marc
2013-03-29
Broadly, this project involved the development and delivery of a new curriculum in wind energy engineering at the Pennsylvania State University; this includes enhancement of the Renewable Energy program at the Pennsylvania College of Technology. The new curricula at Penn State includes addition of wind energy-focused material in more than five existing courses in aerospace engineering, mechanical engineering, engineering science and mechanics and energy engineering, as well as three new online graduate courses. The online graduate courses represent a stand-alone Graduate Certificate in Wind Energy, and provide the core of a Wind Energy Option in an online intercollege professional Mastersmore » degree in Renewable Energy and Sustainability Systems. The Pennsylvania College of Technology erected a 10 kilowatt Xzeres wind turbine that is dedicated to educating the renewable energy workforce. The entire construction process was incorporated into the Renewable Energy A.A.S. degree program, the Building Science and Sustainable Design B.S. program, and other construction-related coursework throughout the School of Construction and Design Technologies. Follow-on outcomes include additional non-credit opportunities as well as secondary school career readiness events, community outreach activities, and public awareness postings.« less
The Systems Engineering Process for Human Support Technology Development
NASA Technical Reports Server (NTRS)
Jones, Harry
2005-01-01
Systems engineering is designing and optimizing systems. This paper reviews the systems engineering process and indicates how it can be applied in the development of advanced human support systems. Systems engineering develops the performance requirements, subsystem specifications, and detailed designs needed to construct a desired system. Systems design is difficult, requiring both art and science and balancing human and technical considerations. The essential systems engineering activity is trading off and compromising between competing objectives such as performance and cost, schedule and risk. Systems engineering is not a complete independent process. It usually supports a system development project. This review emphasizes the NASA project management process as described in NASA Procedural Requirement (NPR) 7120.5B. The process is a top down phased approach that includes the most fundamental activities of systems engineering - requirements definition, systems analysis, and design. NPR 7120.5B also requires projects to perform the engineering analyses needed to ensure that the system will operate correctly with regard to reliability, safety, risk, cost, and human factors. We review the system development project process, the standard systems engineering design methodology, and some of the specialized systems analysis techniques. We will discuss how they could apply to advanced human support systems development. The purpose of advanced systems development is not directly to supply human space flight hardware, but rather to provide superior candidate systems that will be selected for implementation by future missions. The most direct application of systems engineering is in guiding the development of prototype and flight experiment hardware. However, anticipatory systems engineering of possible future flight systems would be useful in identifying the most promising development projects.
1982-09-01
Eufaula Lake, the largest body of water in Oklahoma, extends into McIntosh, Haskell, Pittsburg and Olwiulgee counties , Oklahoma. Construction of the...TABLES iv LIST OF FIGURES vii PROJECT PERSONNEL viii INTRODUCTION 1 Location I Authorization 1 Physical Features 3 Area Description 4 WILDLIFE RESULTS AND...TableLa I Eufaula Lake Project. Summary of pertinent physical 4 characteristics. 2 Eufaula Project. Comparison of terrestrial habitat 9 affected by
NASA Astrophysics Data System (ADS)
Suvannatsiri, Ratchasak; Santichaianant, Kitidech; Murphy, Elizabeth
2015-01-01
This paper reports on a project in which students designed, constructed and tested a model of an existing early warning system with simulation of debris flow in a context of a landslide. Students also assessed rural community members' knowledge of this system and subsequently taught them to estimate the time needed for evacuation of the community in the event of a landslide. Participants were four undergraduate students in a civil engineering programme at a university in Thailand, as well as nine community members and three external evaluators. Results illustrate project and problem-based, experiential learning and highlight the real-world applications and development of knowledge and of hard and soft skills. The discussion raises issues of scalability and feasibility for implementation of these types of projects in large undergraduate engineering classes.
Aircraft Photovoltaic Power-Generating System.
NASA Astrophysics Data System (ADS)
Doellner, Oscar Leonard
Photovoltaic cells, appropriately cooled and operating in the combustion-created high radiant-intensity environment of gas-turbine and jet engines, may replace the conventional (gearbox-driven) electrical power generators aboard jet aircraft. This study projects significant improvements not only in aircraft electrical power-generating-system performance, but also in overall aircraft performance. Jet -engine design modifications incorporating this concept not only save weight (and thus fuel), but are--in themselves --favorable to jet-engine performance. The dissertation concentrates on operational, constructional, structural, thermal, optical, radiometrical, thin-film, and solid-state theoretical aspects of the overall project. This new electrical power-generating system offers solid-state reliability with electrical power-output capability comparable to that of existing aircraft electromechanical power-generating systems (alternators and generators). In addition to improvements in aircraft performance, significant aircraft fuel- and weight-saving advantages are projected.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Djang, Austin
2015-08-22
Thanks to the versatility of the beam lines at SSRL, research there is varied and benefits multiple fields. Each experiment requires a particular set of experiment equipment, which in turns requires its own particular assembly. As such, new engineering challenges arise from each new experiment. My role as an engineering intern has been to help solve these challenges, by designing and assembling experimental devices. My first project was to design a heated sample holder, which will be used to investigate the effect of temperature on a sample's x-ray diffraction pattern. My second project was to help set up an imagingmore » test, which involved designing a cooled grating holder and assembling multiple positioning stages. My third project was designing a 3D-printed pencil holder for the SSRL workstations.« less
How the Army Runs: A Senior Leader Reference Handbook, 2011-2012
2011-01-01
5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES...objectives, carrying out engineer construction projects , by emphasizing the uniqueness of the function and providing associated specialty career...Bringing about change, whether evolutionary or revolutionary, in cases where performance does not meet present requirements, or the projected security
How The Army Runs. A Senior Leader Reference Handbook 2009-2010
2010-01-01
PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES...recruiting objectives, carrying out engineer construction projects , by emphasizing the uniqueness of the function and providing associated specialty career...change, whether evolutionary or revolutionary, in cases where performance does not meet present requirements, or the projected security needs of the
Shuttle Engine Designs Revolutionize Solar Power
NASA Technical Reports Server (NTRS)
2014-01-01
The Space Shuttle Main Engine was built under contract to Marshall Space Flight Center by Rocketdyne, now part of Pratt & Whitney Rocketdyne (PWR). PWR applied its NASA experience to solar power technology and licensed the technology to Santa Monica, California-based SolarReserve. The company now develops concentrating solar power projects, including a plant in Nevada that has created 4,300 jobs during construction.
ERIC Educational Resources Information Center
Peterson, James N.; Hess, Herbert L.
An undergraduate capstone engineering design project now provides hydroelectric power to a remote wilderness location. Students investigated the feasibility of designing, building, and installing a 4kW hydroelectric system to satisfy the need for electric power to support the research and teaching functions of Taylor Ranch, a university facility…
Ornithologists by Design: Kindergarteners Design, Construct, and Evaluate Bird Feeders
ERIC Educational Resources Information Center
Shorter, Angela; Segers, Marcia
2016-01-01
How can an engineer design a bird feeder that attracts many birds? This question resulted from kindergarten students' observations of the bird feeders in their school's bird sanctuary. The challenging question is the heart of project-based learning (PBL), a teaching strategy in which students tackle real-world problems and design projects to solve…
CasCADe: A Novel 4D Visualization System for Virtual Construction Planning.
Ivson, Paulo; Nascimento, Daniel; Celes, Waldemar; Barbosa, Simone Dj
2018-01-01
Building Information Modeling (BIM) provides an integrated 3D environment to manage large-scale engineering projects. The Architecture, Engineering and Construction (AEC) industry explores 4D visualizations over these datasets for virtual construction planning. However, existing solutions lack adequate visual mechanisms to inspect the underlying schedule and make inconsistencies readily apparent. The goal of this paper is to apply best practices of information visualization to improve 4D analysis of construction plans. We first present a review of previous work that identifies common use cases and limitations. We then consulted with AEC professionals to specify the main design requirements for such applications. These guided the development of CasCADe, a novel 4D visualization system where task sequencing and spatio-temporal simultaneity are immediately apparent. This unique framework enables the combination of diverse analytical features to create an information-rich analysis environment. We also describe how engineering collaborators used CasCADe to review the real-world construction plans of an Oil & Gas process plant. The system made evident schedule uncertainties, identified work-space conflicts and helped analyze other constructability issues. The results and contributions of this paper suggest new avenues for future research in information visualization for the AEC industry.
Selection of interest and inflation rates for infrastructure investment analyses.
DOT National Transportation Integrated Search
2014-12-01
The South Dakota Department of Transportation (SDDOT) uses engineering economic analyses (EEA) to : support planning, design, and construction decision-making such as project programming and planning, : pavement type selection, and the occasional val...
Grow our own minority STEM initiative : partnering in outreach.
DOT National Transportation Integrated Search
2017-01-20
The aim of the project is to help students from underrepresented groups connect the highlyvisible construction, operations, and maintenance activities in their community surrounding the new rail corridor to science, technology, engineering, and ma...
Code of Federal Regulations, 2014 CFR
2014-07-01
... engineering services as defined in § 35.937 and construction contracts as described in § 35.938 by grantees... does not apply to work beyond the scope of the project for which grant assistance is awarded (i.e...
Code of Federal Regulations, 2011 CFR
2011-07-01
... engineering services as defined in § 35.937 and construction contracts as described in § 35.938 by grantees... does not apply to work beyond the scope of the project for which grant assistance is awarded (i.e...
Code of Federal Regulations, 2013 CFR
2013-07-01
... engineering services as defined in § 35.937 and construction contracts as described in § 35.938 by grantees... does not apply to work beyond the scope of the project for which grant assistance is awarded (i.e...
15 CFR 921.80 - Application information.
Code of Federal Regulations, 2010 CFR
2010-01-01
... awards for preacquisition, acquisition and development, operation and management, and special education...-site selection, operation and management, research, and education and interpretive awards. The... projects, or restorative activities involving construction, must include a preliminary engineering report...
Advanced Monobore Concept, Development of CFEX Self-Expanding Tubular Technology
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jeff Spray
2007-09-30
The Advanced Monobore Concept--CFEX{copyright} Self-Expanding Tubular Technology Development was a successfully executed fundamental research through field demonstration project. This final report is presented as a progression, according to basic technology development steps. For this project, the research and development steps used were: concept development, engineering analysis, manufacturing, testing, demonstration, and technology transfer. The CFEX{copyright} Technology Development--Advanced Monobore Concept Project successfully completed all of the steps for technology development, covering fundamental research, conceptual development, engineering design, advanced-level prototype construction, mechanical testing, and downhole demonstration. Within an approximately two year period, a partially defined, broad concept was evolved into a substantial newmore » technological area for drilling and production engineering applicable a variety of extractive industries--which was also successfully demonstrated in a test well. The demonstration achievement included an actual mono-diameter placement of two self-expanding tubulars. The fundamental result is that an economical and technically proficient means of casing any size of drilling or production well or borehole is indicated as feasible based on the results of the project. Highlighted major accomplishments during the project's Concept, Engineering, Manufacturing, Demonstration, and Technology Transfer phases, are given.« less
Engineering Technical Support Center Annual Report Fiscal ...
The United States Environmental Protection Agency (EPA or Agency) Office of Research and Development (ORD) created the Engineering Technical Support Center (ETSC) in 1987, one of several technical support centers created as part of the Technical Support Project (TSP). ETSC provides engineering expertise to Agency program and regional offices and remediation teams working at contaminated sites across the country. The ETSC is operated within ORD’s Land Remediation and Pollution Control Division (LRPCD) of the National Risk Management Research Laboratory (NRMRL) in Cincinnati, Ohio. The ETSC’s mission is to provide site-specific scientific and engineering technical support to Remedial Project Managers, On-Scene Coordinators, and other remediation personnel at contaminated sites. This allows local, regional, or national authorities to work more quickly, efficiently, and cost effectively, while also increasing the technical experience of the remediation team. Since its inception, the ETSC has supported countless projects across all EPA Regions in almost all states and territories. This report highlights significant projects the ETSC supported in fiscal year 2015 (FY15). These projects addressed an array of environmental scenarios, such as remote mining contamination, expansive landfill waste, cumulative impacts from multiple contamination sources, and persistent threats from abandoned industrial sites. Constructing and testing new and innovative treatment technol
124. Photocopy of original construction drawing, dated 12 October 1935 ...
124. Photocopy of original construction drawing, dated 12 October 1935 (Original print in the possession of U.S. Army Corps of Engineers, Portland District, Portland, OR.) (T-3-83, Sheet 1 of 6) COLLECTION CHANNEL DETAILS: WOOD GRATING AND BAFFLES IN DIFFUSION CHAMBERS. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR
Review and Prospect of BIM Policy in China
NASA Astrophysics Data System (ADS)
Liu, Bingsheng; Wang, Min; Zhang, Yutao; Liu, Rui; Wang, Anmin
2017-10-01
In the process of architectural design, construction, operation and maintenance, the problem of inefficiency and inaccuracy in information application and exchange has caused substantial waste of resources and risk in construction industry. Building Information Management provides an opportunity to address the issue. Building information modelling (BIM) has been increasingly applied in design, construction and other information management in China as its important role in reducing engineering changes, improving engineering quality, shortening project duration, saving project cost, enhancing information sharing among the participants many others. As an integration of process and product, its development and implementation need government regulation to enhance its applications effect and standardize its adoption and implementation. Especially, the government guidance affects the application and development of new technology to a great extent in China. However, relevant policy development falls behind the rapid development of its application in practice in China, which has led to many problems in construction practice. In order to develop effective BIM policy for China, this paper conducted a comprehensive review about existing BIM policy in China by analysing its status and problems, comparing it with the corresponding policy in developed countries such as the USA and UK. The expected policy development direction is also discussed and proposed.
Stand for testing the electrical race car engine
NASA Astrophysics Data System (ADS)
Baier, M.; Franiasz, J.; Mierzwa, P.; Wylenzek, D.
2015-11-01
An engine test stand created especially for research of electrical race car is described in the paper. The car is an aim of Silesian Greenpower project whose participants build and test electrical vehicles to take part in international races in Great Britain. The engine test stand is used to test and measure the characteristics of vehicles and their engines. It has been designed particularly to test the electric cars engineered by students of Silesian Greenpower project. The article contains a description how the test stand works and shows its versatility in many areas. The paper presents both construction of the test stand, control system and sample results of conducted research. The engine test stand was designed and modified using PLM Siemens NX 8.5. The construction of the test stand is highly modular, which means it can be used both for testing the vehicle itself or for tests without the vehicle. The test stand has its own wheel, motor, powertrain and braking system with second engine. Such solution enables verifying various concepts without changing the construction of the vehicle. The control system and measurement system are realized by enabling National Instruments product myRIO (RIO - Reconfigurable Input/Output). This controller in combination with powerful LabVIEW environment performs as an advanced tool to control torque and speed simultaneously. It is crucial as far as the test stand is equipped in two motors - the one being tested and the braking one. The feedback loop is realized by an optical encoder cooperating with the rotor mounted on the wheel. The results of tests are shown live on the screen both as a chart and as single values. After performing several tests there is a report generated. The engine test stand is widely used during process of the Silesian Greenpower vehicle design. Its versatility enables powertrain testing, wheels and tires tests, thermal analysis and more.
Title I preliminary engineering for: A. S. E. F. solid waste to methane gas
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1976-01-01
An assignment to provide preliminary engineering of an Advanced System Experimental Facility for production of methane gas from urban solid waste by anaerobic digestion is documented. The experimental facility will be constructed on a now-existing solid waste shredding and landfill facility in Pompano Beach, Florida. Information is included on: general description of the project; justification of basic need; process design; preliminary drawings; outline specifications; preliminary estimate of cost; and time schedules for design and construction of accomplishment of design and construction. The preliminary cost estimate for the design and construction phases of the experimental program is $2,960,000, based on Dec.more » 1975 and Jan. 1976 costs. A time schedule of eight months to complete the Detailed Design, Equipment Procurement and the Award of Subcontracts is given.« less
NASA Astrophysics Data System (ADS)
Saounatsou, Chara; Georgi, Julia
2014-08-01
The Polyphyto Hydroelectric Project was constructed in 1974 and it has been operating since on the Aliakmonas River, Kozani prefecture, by the Greek Public Power Corporation. The construction of the Ilarion Hydroelectric Project, upstream from the Polyphyto Reservoir, has been recently completed and will start operating in the near future. Apart from hydroelectric power production, the Polyphyto reservoir provides flood control to the areas below the Polyphyto dam. It is also used to manage water provision to the city of Thessaloniki and adjacent agricultural plain, providing at the same time cooling water to the Thermo Electric Projects in Ptolemaida. The Polyphyto reservoir has potential for further development as an economic fulcrum to the region in which is located. The Kozani and Servia-Velvendos Municipalities have proceeded to the construction of several touristic, nautical - athletic and fishing projects. In order to promote such developments, while preserving the artificial wetland, flora and fauna of the Polyphyto Reservoir, it is important to reduce the fluctuation of the reservoir elevation which according to its technical characteristics is 21m. The aim of this paper is to propose the combined operation of the two Hydroelectric Project reservoirs to satisfy all the present Polyphyto Hydroelectric Project functions and to reduce the annual fluctuation of the Polyphyto Reservoir. The HEC-5, Version 8 / 1998 computer model was used in our calculations, as developed by the Hydrologic Engineering Center (HEC) of the US Army Corps of Engineers for reservoir operation simulation. Five possible operation scenarios are tested in this paper to show that the present fluctuation of the Polyphyto Reservoir can be reduced, with some limitations, except during dry weather periods.
Army Corps of Engineers: Actions Needed to Improve Cost Sharing for Dam Safety Repairs
2015-12-01
at 15 percent when modifications result from new hydrologic or seismic data, or changes in state-of-the-art design or construction criteria deemed...due to changes in state-of-the-art design or construction criteria (state-of-the-art provision)—since the enactment of the enabling legislation in...safety repair projects funded for design or construction from fiscal year 20076 to fiscal year 2016, we analyzed Corps dam safety documents and
But I'm an engineer—not a contracts lawyer!
NASA Astrophysics Data System (ADS)
Warner, Mark; Bass, Harvey
2012-09-01
Industrial partners, commercial vendors, and subsystem contractors play a large role in the design and construction of modern telescopes. Because many telescope projects carry relatively small staffs, engineers are often required to perform the additional functions of technical writing, cost estimating, and contract bidding and negotiating. The skills required to carry out these tasks are not normally taught in traditional engineering programs. As a result, engineers often learn to write Request for Proposals (RFPs), select vendors, and negotiate contracts by trial-and-error and/or by adapting previous project documents to match their own requirements. Typically, this means that at the end of a contract the engineer has a large list of do's, don'ts, and lessons learned for the next RFP he or she must generate. This paper will present one such engineer's experience writing and bidding proposal packages for large telescope components and subsystems. Included are: thoughts on structuring SOWs, Specs, ICDs, and other RFP documents; modern methods for bidding the work; and systematic means for selecting and negotiating with a contractor to arrive at the best value for the project.
Earthworks logistics in the high density urban development conditions - case study
NASA Astrophysics Data System (ADS)
Sobotka, A.; Blajer, M.
2017-10-01
Realisation of the construction projects on highly urbanised areas carries many difficulties and logistic problems. Earthworks conducted in such conditions constitute a good example of how important it is to properly plan the works and use the technical means of the logistics infrastructure. The construction processes on the observed construction site, in combination with their external logistics service are a complex system, difficult for mathematical modelling and achievement of appropriate data for planning the works. The paper shows describe and analysis of earthworks during construction of the Centre of Power Engineering of AGH in Krakow for two stages of a construction project. At the planning stage in the preparatory phase (before realization) and in the implementation phase of construction works (foundation). In the first case, an example of the use of queuing theory for prediction of excavation time under random work conditions of the excavator and the associated trucks is provided. In the second case there is a change of foundation works technology resulting as a consequence of changes in logistics earthworks. Observation of the construction has confirmed that the use of appropriate methods of construction works management, and in this case agile management, the time and cost of the project have not been exceeded. The success of a project depends on the ability of the contractor to react quickly when changes occur in the design, technology, environment, etc.
Systems Engineering and Reusable Avionics
NASA Technical Reports Server (NTRS)
Conrad, James M.; Murphy, Gloria
2010-01-01
One concept for future space flights is to construct building blocks for a wide variety of avionics systems. Once a unit has served its original purpose, it can be removed from the original vehicle and reused in a similar or dissimilar function, depending on the function blocks the unit contains. For example: Once a lunar lander has reached the moon's surface, an engine controller for the Lunar Decent Module would be removed and used for a lunar rover motor control unit or for a Environmental Control Unit for a Lunar Habitat. This senior design project included the investigation of a wide range of functions of space vehicles and possible uses. Specifically, this includes: (1) Determining and specifying the basic functioning blocks of space vehicles. (2) Building and demonstrating a concept model. (3) Showing high reliability is maintained. The specific implementation of this senior design project included a large project team made up of Systems, Electrical, Computer, and Mechanical Engineers/Technologists. The efforts were made up of several sub-groups that each worked on a part of the entire project. The large size and complexity made this project one of the more difficult to manage and advise. Typical projects only have 3-4 students, but this project had 10 students from five different disciplines. This paper describes the difference of this large project compared to typical projects, and the challenges encountered. It also describes how the systems engineering approach was successfully implemented so that the students were able to meet nearly all of the project requirements.
Minimizing the effects of pile driving vibrations : research spotlight.
DOT National Transportation Integrated Search
2013-11-01
Engineers must take care that the vibrations from pile driving : operations during bridge construction do not damage underground : utilities or cause settlement in the foundations of nearby structures. : In this project, researchers developed a simpl...
NASA Astrophysics Data System (ADS)
von der Thannen, Magdalena; Paratscha, Roman; Smutny, Roman; Lampalzer, Thomas; Strauss, Alfred; Rauch, Hans Peter
2016-04-01
Nowadays there is a high demand on engineering solutions considering not only technical aspects but also ecological and aesthetic values. In this context soil bioengineering techniques are often used as standalone solutions or in combination with conventional engineering structures. It is a construction technique that uses biological components for hydraulic and civil engineering solutions. In general it pursues the same objectives as conventional civil engineering structures. Currently the used assessment methods for soil bioengineering structures are referencing technically, ecologically and socio-economically. In a modern engineering approach additionally, environmental impacts and potential added values should be considered. The research project E-Protect aims at developing Environmental Life Cycle Assessment (LCA) models for this special field of alpine protective constructions. Both, the Cumulative Energy Demand (CED) and the Global Warming Potential (GWP) should be considered in an Environmental LCA over the whole life cycle of an engineering structure. The life cycle itself can be divided into three phases: the construction phase, the use phase and the end of life phase. The paper represents a concept to apply an Environmental LCA model for soil bioengineering structures. Beside the construction phase of these structures particular attention will be given to the use phase. It is not only important in terms of engineering effects but also plays an important role for positive carbon footprint due to the growing plants of soil bioengineering structures in contrast to conventional structures. Innovative Environmental LCA models will be applied to soil bioengineering structures which provide a new transparency for the responsible planners and stakeholders, by pointing out the total consumption of resources in all construction phases and components.
Minimizing delays in the Jordanian construction industry by adopting BIM technology
NASA Astrophysics Data System (ADS)
Btoush, M.; Harun, A. T.
2017-11-01
The Jordanian construction industry plays a significant role and contributes immensely to the gross domestic product (GDP) of the economy. However, the Jordanian public work and housing ministry and most industry players including engineers and contractors have reported that most of the projects experience delays which lead time and cost overruns, and extra efforts. The main causes of delays identified by researchers include poor scheduling and planning, change orders, site conditions, weather, late deliveries, incompetent technical staff. To address these challenges, the implementation of building information modelling (BIM) is paramount. This paper presents BIM as a powerful tool for reducing delays in Jordan construction projects. The paper focuses on two main parts; the first part involves the identification of the major causes of delays, and the second part is to accurately outline the roles and responsibilities of BIM specialist in construction projects. Finally, the paper matches the roles and responsibilities of BIM specialist and the causes of delays, and how the delays are addressed through BIM specialist.
CF60 Concrete Composition Design and Application on Fudiankou Xijiang Super Large Bridge
NASA Astrophysics Data System (ADS)
Qiu, Yi Mei; Wen, Sen Yuan; Chen, Jun Xiang
2018-06-01
Guangxi Wuzhou City Ring Road Fudiankou Xijiang super large bridge CF60 concrete is a new multi-phase composite high-performance concrete, this paper for the Fudiankou Xijiang bridge structure and characteristics of the project, in accordance with the principle of local materials and technical specification requirements, combined with the site conditions of CF60 engineering high performance concrete component materials, proportion and the technical performance, quantify the main physical and mechanical performance index. Analysis main influencing factors of the technical indicators, reasonable adjustment of concrete mix design parameters, and the use of technical means of admixture and multi-function composite admixture of concrete, obtain the optimal proportion of good work, process, mechanical properties stability and durability of engineering properties, recommend and verification of concrete mix; to explore the CF60 high performance concrete Soil in the Fudiankou Xijiang bridge application technology, detection and tracking the quality of concrete construction, concrete structure during the construction of the key technology and control points is proposed, evaluation of CF60 high performance concrete in the actual engineering application effect and benefit to ensure engineering quality of bridge structure and service life, and super long span bridge engineering construction to provide basis and reference.
Stereoscopic display of 3D models for design visualization
NASA Astrophysics Data System (ADS)
Gilson, Kevin J.
2006-02-01
Advances in display technology and 3D design visualization applications have made real-time stereoscopic visualization of architectural and engineering projects a reality. Parsons Brinkerhoff (PB) is a transportation consulting firm that has used digital visualization tools from their inception and has helped pioneer the application of those tools to large scale infrastructure projects. PB is one of the first Architecture/Engineering/Construction (AEC) firms to implement a CAVE- an immersive presentation environment that includes stereoscopic rear-projection capability. The firm also employs a portable stereoscopic front-projection system, and shutter-glass systems for smaller groups. PB is using commercial real-time 3D applications in combination with traditional 3D modeling programs to visualize and present large AEC projects to planners, clients and decision makers in stereo. These presentations create more immersive and spatially realistic presentations of the proposed designs. This paper will present the basic display tools and applications, and the 3D modeling techniques PB is using to produce interactive stereoscopic content. The paper will discuss several architectural and engineering design visualizations we have produced.
Review of Environmental Consequences of Waterway Design and Construction Practices as of 1979.
1982-04-01
AD-A118 07Th VANDERISILT UNIV NASHVILLE I TN F/ ,2 REVIEW OF ENVIRONMENTAL CONSEQUENCES OF WATERWAY DESIGN AND CON-ETC(U U CLASSIFIED APR 82 E L... DESIGN AND CONSTRUCTION PRACTICES AS OF 1979 8. PERFORMING ORG. REPORT NUMEER 7. AUTHOR(q) S. CONTRACT OR GRANT NUMUER(t) Edward L. Thackston...numF*-" a I~mOlPi lt block ninr) >. Waterway projects designed and constructed by the Corps of Engineers (CE) include dikes, revetments, levees, and
NASA Astrophysics Data System (ADS)
Saaltink, Rémon; Dekker, Stefan C.; Griffioen, Jasper; Wassen, Martin J.
2016-04-01
Interest is growing in using soft sediment as a building material in eco-engineering projects. Wetland construction in the Dutch lake Markermeer is an example: here the option of dredging some of the clay-rich lake-bed sediment and using it to construct 10.000 ha of wetland will soon go under construction. Natural processes will be utilized during and after construction to accelerate ecosystem development. Knowing that plants can eco-engineer their environment via positive or negative biogeochemical plant-soil feedbacks, we conducted a six-month greenhouse experiment to identify the key biogeochemical processes in the mud when Phragmites australis is used as an eco-engineering species. We applied inverse biogeochemical modeling to link observed changes in pore water composition to biogeochemical processes. Two months after transplantation we observed reduced plant growth and shriveling as well as yellowing of foliage. The N:P ratios of plant tissue were low and were affected not by hampered uptake of N but by enhanced uptake of P. Plant analyses revealed high Fe concentrations in the leaves and roots. Sulfate concentrations rose drastically in our experiment due to pyrite oxidation; as reduction of sulfate will decouple Fe-P in reducing conditions, we argue that plant-induced iron toxicity hampered plant growth, forming a negative feedback loop, while simultaneously there was a positive feedback loop, as iron toxicity promotes P mobilization as a result of reduced conditions through root death, thereby stimulating plant growth and regeneration. Given these two feedback mechanisms, we propose that when building wetlands from these mud deposits Fe-tolerant species are used rather than species that thrive in N-limited conditions. The results presented in this study demonstrate the importance of studying the biogeochemical properties of the building material and the feedback mechanisms between plant and soil prior to finalizing the design of the eco-engineering project.
Activities of the Center for Space Construction
NASA Technical Reports Server (NTRS)
1993-01-01
The Center for Space Construction (CSC) at the University of Colorado at Boulder is one of eight University Space Engineering Research Centers established by NASA in 1988. The mission of the center is to conduct research into space technology and to directly contribute to space engineering education. The center reports to the Department of Aerospace Engineering Sciences and resides in the College of Engineering and Applied Science. The college has a long and successful track record of cultivating multi-disciplinary research and education programs. The Center for Space Construction is prominent evidence of this record. At the inception of CSC, the center was primarily founded on the need for research on in-space construction of large space systems like space stations and interplanetary space vehicles. The scope of CSC's research has now evolved to include the design and construction of all spacecraft, large and small. Within this broadened scope, our research projects seek to impact the underlying technological basis for such spacecraft as remote sensing satellites, communication satellites, and other special purpose spacecraft, as well as the technological basis for large space platforms. The center's research focuses on three areas: spacecraft structures, spacecraft operations and control, and regolith and surface systems. In the area of spacecraft structures, our current emphasis is on concepts and modeling of deployable structures, analysis of inflatable structures, structural damage detection algorithms, and composite materials for lightweight structures. In the area of spacecraft operations and control, we are continuing our previous efforts in process control of in-orbit structural assembly. In addition, we have begun two new efforts in formal approach to spacecraft flight software systems design and adaptive attitude control systems. In the area of regolith and surface systems, we are continuing the work of characterizing the physical properties of lunar regolith, and we are at work on a project on path planning for planetary surface rovers.
The effect of Problem/Project-Based Learning on a desired skill set for construction professionals
NASA Astrophysics Data System (ADS)
Sirotiak, Todd L.
The purpose of this study was to investigate if a Problem/Project-Based Learning (PBL) approach can affect certain non-technical, "soft" skills of construction engineers. Such skills include leadership, adaptability, and stress management. In mixed design research, quantitative and qualitative data are assembled and analyzed collectively. For this study, two separate assessment tools were used for the quantitative portion, while open-ended written reflections and a partially closed-ended senior questionnaire were implemented for the qualitative portion. A hypothetical model was used to investigate certain soft skills based on prior research documenting need. Skills investigated were confidence, stress coping, leadership, communication skills, adaptability, and management skills. Descriptive statistics, open-ended final written reflections, and a partially closed-ended senior questionnaire were used to analyze the data. PBL is a process in which the students are challenged to develop realistic solutions on open, less structured, real world type problems. The results of this study performed with the combined count of nearly 60 students suggest that PBL can influence several soft skills of senior construction engineers. Specifically, these findings demonstrate the following: (a) PBL appears to affect students' soft skills; (b) students appear to recognize the realism and "real world" applicability that PBL brings to their skill development; and (c) the data suggest that the experience is holistic and offers opportunities for balanced growth in several ways. Some key competencies such as communication and leadership indicated significant enhancements. Although this study was limited to one academic year of the university's construction engineering program, it provides interesting insight to changes within the time period investigated. This study should be replicated in other construction engineering environments to investigate a larger population sample. In addition, industry, professional consultants, and academic entities are encouraged to review current learning methods to ensure that they are implementing the findings and methodology offered in this study.
The unique challenge of managing an undergraduate Get-Away-Special experiment
NASA Technical Reports Server (NTRS)
Roming, Peter W. A.; Spute, Mark K.; Williams, Memorie K.
1992-01-01
A group of Bringham Young University (BYU) undergraduate students has undertaken an experiment to design and build a normal incidence soft x ray robotics telescope for solar observations. The design phase of this, GOLDHELOX project, has now been completed and final construction and modifications are in progress. The design and manufacture of the payload is under the direction of team leaders and a system's integrator. A goal of this project is educating and furnishing experiences in space engineering and physics for undergraduate students. Our main source of funding is NASA and the BYU Colleges of Physical and Mathematical Sciences and Engineering and Technology. This project is possible because of the NASA Get-Away Special (GAS) program. The only feasible alternative is using an expensive sounding rocket. We estimate the sun tracking and guidance package alone would cost upwards of a million dollars -- at least ten times our entire budget. Because of the GAS program, we simplified the construction, operation, and programming of the instruments with resulting savings in weight, cost, and time spent.
Liquid Thermal Diffusion during the Manhattan Project
NASA Astrophysics Data System (ADS)
Cameron Reed, B.
2011-06-01
On the basis of Manhattan Engineer District documents, a little known Naval Research Laboratory report of 1946, and other sources, I construct a more complete history of the liquid-thermal-diffusion method of uranium enrichment during World War II than is presented in official histories of the Manhattan Project. This method was developed by Philip Abelson (1913-2004) and put into operation at the rapidly-constructed S-50 plant at Oak Ridge, Tennessee, which was responsible for the first stage of uranium enrichment, from 0.72% to 0.85% U-235, producing nearly 45,000 pounds of enriched U-235 by July 1945 at a cost of just under 20 million. I review the history, design, politics, construction, and operation of the S-50 liquid-thermal-diffusion plant.
NASA Astrophysics Data System (ADS)
Saaltink, Rémon; Dekker, Stefan C.; Griffioen, Jasper; Wassen, Martin J.
2016-09-01
Interest is growing in using soft sediment as a foundation in eco-engineering projects. Wetland construction in the Dutch lake Markermeer is an example: here, dredging some of the clay-rich lake-bed sediment and using it to construct wetland will soon begin. Natural processes will be utilized during and after construction to accelerate ecosystem development. Knowing that plants can eco-engineer their environment via positive or negative biogeochemical plant-soil feedbacks, we conducted a 6-month greenhouse experiment to identify the key biogeochemical processes in the mud when Phragmites australis is used as an eco-engineering species. We applied inverse biogeochemical modeling to link observed changes in pore water composition to biogeochemical processes. Two months after transplantation we observed reduced plant growth and shriveling and yellowing of foliage. The N : P ratios of the plant tissue were low, and these were affected not by hampered uptake of N but by enhanced uptake of P. Subsequent analyses revealed high Fe concentrations in the leaves and roots. Sulfate concentrations rose drastically in our experiment due to pyrite oxidation; as reduction of sulfate will decouple Fe-P in reducing conditions, we argue that plant-induced iron toxicity hampered plant growth, forming a negative feedback loop, while simultaneously there was a positive feedback loop, as iron toxicity promotes P mobilization as a result of reduced conditions through root death, thereby stimulating plant growth and regeneration. Given these two feedback mechanisms, we propose the use of Fe-tolerant species rather than species that thrive in N-limited conditions. The results presented in this study demonstrate the importance of studying the biogeochemical properties of the situated sediment and the feedback mechanisms between plant and soil prior to finalizing the design of the eco-engineering project.
NASA Technical Reports Server (NTRS)
1980-01-01
Burns & McDonnell Engineering's environmental control study is assisted by NASA's Computer Software Management and Information Center's programs in environmental analyses. Company is engaged primarily in design of such facilities as electrical utilities, industrial plants, wastewater treatment systems, dams and reservoirs and aviation installations. Company also conducts environmental engineering analyses and advises clients as to the environmental considerations of a particular construction project. Company makes use of many COSMIC computer programs which have allowed substantial savings.
2012-11-01
Building Information Modeling ( BIM ...12-2, Supplement 2 November 2012 The US Army Corps of Engineers Roadmap for Life-Cycle Building Information Modeling ( BIM ) Supplement 2 – BIM ...39180 ERDC SR-12-2, Supplement 2 (November 2012) ii Abstract Building Information Modeling ( BIM ) technology has rapidly gained ac-
2012-11-01
Building Information Modeling ( BIM ...12-2, Supplement 1 November 2012 The US Army Corps of Engineers Roadmap for Life-Cycle Building Information Modeling ( BIM ) Supplement 1 – BIM ...ERDC SR-12-2, Supplement 1 (November 2012) ii Abstract Building Information Modeling ( BIM ) technology has rapidly gained ac- ceptance throughout
DE-EE0006714 Final Report-Project Icebreaker™
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wagner, Lorry; Karpinski, David; Nagusky, Beth
Project Icebreaker, a 20 Megawatt offshore wind project 8 miles north of Cleveland, OH in Lake Erie, has been under development by the Lake Erie Energy Development Corporation since 2009. Significant development efforts were completed prior to the award of DE-EE0006714 (December 2014). This report describes the status of the work performed under award DE-EE0006714. The work was organized into several categories or tasks. The report presents the status of that work in each of eleven (11) main tasks: 1) State and Federal Permits; 2) Mono Bucket Foundation Engineering; 3) Construction and Installation Engineering; 4) Cable Route Survey; 5) Electricalmore » System Design; 6) Power Off-take; 7) Project Costs and Risk Management; 8) Operations and Maintenance Planning; 9) Domestic Supply Chain Development; 10) Instrumentation Planning; and 11) Department of Energy Review.« less
NASA Astrophysics Data System (ADS)
Ranzi, Roberto; Kojiri, T.; Mynett, A.; Barontini, S.; van de Giesen, N.; Kolokytha, E.; Ngo, L. A.; Oreamuno, R.; Renard, B.; Sighomnou, D.; Vizina, A.
2010-05-01
IAHR, the International Association for Hydro-Environment Engineering and Research launched a research Project called Climate Change impact on the Hydrological cycle, water management and Engineering (IAHR CCHE Project). It was motivated by the fact that, although it is now well accepted that, in the light of the recent IPCC reports the vast majority of members of the scientific community are convinced that the climate is changing or at least will experience a significant fluctuation already during the current century, it is perceived that some hydrologists, water experts and hydraulic engineers are not yet ready to incorporate climate change scenarios in their designs for such projects as: - flood protection and river training, - dam rehabilitation, - water resources management under water scarcity and changes in the hydrological regimes. The objective of the project is to encourage a close co-operation between the scientific and engineering communities in taking appropriate and timely action in response to the impact of climate change on the hydrological regime and on water resource projects. The project aims at reporting on (a) the current state of knowledge as regards the impact of projected climate change on the hydrological regime in different regions of the world, where these regions are defined not just in geographic terms but also on the basis of their level of economic and water resources development; (b) the extent to which these impacts are recognized and taken into account by national water authorities, engineering organizations and other regulating bodies in setting their standard practices and procedures for the planning, design and operation of water works. These adaptation measures will include both "hard" responses, such as the construction or enlargement of engineering structures, and "soft" responses, such as changes in legislation or the operating rules of existing structures. An overview of the project and preliminary results extracted from of an Inventory of existing studies and projects considering observed and projected trends in the hydrological regimes of riverbasins and adaptation measures of the structural and non-structural type in Europe, Africa, America, Asia and Oceania and are presented.
Environmental Assessment (EA): Proposed Software Facilities, Hill Air Force Base, Utah
2011-04-19
retention facilities ; • connections to adjacent buried utilities consisting of water, electricity, natural gas, telephone/ data , sanitary sewer, and storm...engineering, development, and testing workloads for F-22 and F-35 aircraft. Military construction (MILCON) project data explain existing facilities ...Existing Facilities MILCON project data state there are no facilities on Hill AFB with adequate security to house the specialized laboratory space or
2015-09-01
property conveyed by the Navy. Installation officials generally have more flexibility in real-estate transactions. According to officials of the...Air Force Civil Engineer Center, in-kind payment projects offer installation officials greater flexibility in executing real-estate transactions...air conditioning, fire protection, utility connections, pavement , and information systems. Agreement between Army and Air Force Exchange Services
Material Testing and Initial Pavement Design Modeling: Minnesota Road Research Project
DOT National Transportation Integrated Search
1996-09-01
Between January 1990 and December 1994, a study verified and applied a Corps of Engineers-developed mechanistic design and evaluation method for pavements in seasonal frost areas as part of a Construction Productivity Advancement Research (CPAR) proj...
DOT National Transportation Integrated Search
2015-05-01
Nearly two-thirds of highways in the United States are constructed on in-place soils : with poor or undesirable characteristics. These materials demonstrate undesirable : engineering behavior, such as low bearing capacity, high shrink/swell potential...
Control of Subsurface Contaminant Migration by Vertical Engineered Barriers
This Fact Sheet is intended to provide remedial project managers (RPMs), on-scene coordinators (OSCs), contractors, and other remediation stakeholders with a basic overview of hazardous waste containment systems constructed to prevent or limit the migration of contamination in gr...
Knowledge, attitude and practices for design for safety: A study on civil & structural engineers.
Goh, Yang Miang; Chua, Sijie
2016-08-01
Design for safety (DfS) (also known as prevention through design, safe design and Construction (Design and Management)) promotes early consideration of safety and health hazards during the design phase of a construction project. With early intervention, hazards can be more effectively eliminated or controlled leading to safer worksites and construction processes. DfS is practiced in many countries, including Australia, the UK, and Singapore. In Singapore, the Manpower Ministry enacted the DfS Regulations in July 2015, which will be enforced from August 2016 onwards. Due to the critical role of civil and structural (C&S) engineers during design and construction, the DfS knowledge, attitude and practices (KAP) of C&S engineers have significant impact on the successful implementation of DfS. Thus, this study aims to explore the DfS KAP of C&S engineers so as to guide further research in measuring and improving DfS KAP of designers. During the study, it was found that there is a lack of KAP studies in construction management. Therefore, this study also aims to provide useful lessons for future applications of the KAP framework in construction management research. A questionnaire was developed to assess the DfS KAP of C&S engineers. The responses provided by 43 C&S engineers were analyzed. In addition, interviews with experienced construction professionals were carried out to further understand perceptions of DfS and related issues. The results suggest that C&S engineers are supportive of DfS, but the level of DfS knowledge and practices need to be improved. More DfS guidelines and training should be made available to the engineers. To ensure that DfS can be implemented successfully, there is a need to study the contractual arrangements between clients and designers and the effectiveness of different implementation approaches for the DfS process. The questionnaire and findings in this study provided the foundation for a baseline survey with larger sample size, which is currently being planned. In contrast to earlier studies, the study showed that the responding C&S engineers were supportive of the DfS. The study showed that the key to improving the DfS KAP of C&S engineers is by improving clients' motivation for DfS. Copyright © 2015 Elsevier Ltd. All rights reserved.
NASA Technical Reports Server (NTRS)
Mueller, R. P.; Townsend, I. I.; Tamasy, G. J.; Evers, C. J.; Sibille, L. J.; Edmunson, J. E.; Fiske, M. R.; Fikes, J. C.; Case, M.
2018-01-01
The purpose of the Automated Construction of Expeditionary Structures, Phase 3 (ACES 3) project is to incorporate the Liquid Goods Delivery System (LGDS) into the Dry Goods Delivery System (DGDS) structure to create an integrated and automated Materials Delivery System (MDS) for 3D printing structures with ordinary Portland cement (OPC) concrete. ACES 3 is a prototype for 3-D printing barracks for soldiers in forward bases, here on Earth. The LGDS supports ACES 3 by storing liquid materials, mixing recipe batches of liquid materials, and working with the Dry Goods Feed System (DGFS) previously developed for ACES 2, combining the materials that are eventually extruded out of the print nozzle. Automated Construction of Expeditionary Structures, Phase 3 (ACES 3) is a project led by the US Army Corps of Engineers (USACE) and supported by NASA. The equivalent 3D printing system for construction in space is designated Additive Construction with Mobile Emplacement (ACME) by NASA.
ENCOMPASS: A SAGA based environment for the compositon of programs and specifications, appendix A
NASA Technical Reports Server (NTRS)
Terwilliger, Robert B.; Campbell, Roy H.
1985-01-01
ENCOMPASS is an example integrated software engineering environment being constructed by the SAGA project. ENCOMPASS supports the specification, design, construction and maintenance of efficient, validated, and verified programs in a modular programming language. The life cycle paradigm, schema of software configurations, and hierarchical library structure used by ENCOMPASS is presented. In ENCOMPASS, the software life cycle is viewed as a sequence of developments, each of which reuses components from the previous ones. Each development proceeds through the phases planning, requirements definition, validation, design, implementation, and system integration. The components in a software system are modeled as entities which have relationships between them. An entity may have different versions and different views of the same project are allowed. The simple entities supported by ENCOMPASS may be combined into modules which may be collected into projects. ENCOMPASS supports multiple programmers and projects using a hierarchical library system containing a workspace for each programmer; a project library for each project, and a global library common to all projects.
Computer aided system engineering for space construction
NASA Technical Reports Server (NTRS)
Racheli, Ugo
1989-01-01
This viewgraph presentation covers the following topics. Construction activities envisioned for the assembly of large platforms in space (as well as interplanetary spacecraft and bases on extraterrestrial surfaces) require computational tools that exceed the capability of conventional construction management programs. The Center for Space Construction is investigating the requirements for new computational tools and, at the same time, suggesting the expansion of graduate and undergraduate curricula to include proficiency in Computer Aided Engineering (CAE) though design courses and individual or team projects in advanced space systems design. In the center's research, special emphasis is placed on problems of constructability and of the interruptability of planned activity sequences to be carried out by crews operating under hostile environmental conditions. The departure point for the planned work is the acquisition of the MCAE I-DEAS software, developed by the Structural Dynamics Research Corporation (SDRC), and its expansion to the level of capability denoted by the acronym IDEAS**2 currently used for configuration maintenance on Space Station Freedom. In addition to improving proficiency in the use of I-DEAS and IDEAS**2, it is contemplated that new software modules will be developed to expand the architecture of IDEAS**2. Such modules will deal with those analyses that require the integration of a space platform's configuration with a breakdown of planned construction activities and with a failure modes analysis to support computer aided system engineering (CASE) applied to space construction.
Constructing a modern cytology laboratory: A toolkit for planning and design.
Roberson, Janie; Wrenn, Allison; Poole, John; Jaeger, Andrew; Eltoum, Isam A
2013-01-01
Constructing or renovating a laboratory can be both challenging and rewarding. UAB Cytology (UAB CY) recently undertook a project to relocate from a building constructed in 1928 to new space. UAB CY is part of an academic center that provides service to a large set of patients, support training of one cytotechnology program and one cytopathology fellowship training program and involve actively in research and scholarly activity. Our objectives were to provide a safe, aesthetically pleasing space and gain efficiencies through lean processes. The phases of any laboratory design project are Planning, Schematic Design (SD), Design Development (DD), Construction Documents (CD) and Construction. Lab personnel are most critical in the Planning phase. During this time stakeholders, relationships, budget, square footage and equipment were identified. Equipment lists, including what would be relocated, purchased new and projected for future growth ensure that utilities were matched to expected need. A chemical inventory was prepared and adequate storage space was planned. Regulatory and safety requirements were discussed. Tours and high level process flow diagrams helped architects and engineers understand the laboratory daily work. Future needs were addressed through a questionnaire which identified potential areas of growth and technological change. Throughout the project, decisions were driven by data from the planning phase. During the SD phase, objective information from the first phase was used by architects and planners to create a general floor plan. This was the basis of a series of meetings to brainstorm and suggest modifications. DD brings more detail to the plans with engineering, casework, equipment specifics, finishes. Design changes should be completed at this phase. The next phase, CD took the project from the lab purview into purely technical mode. Construction documents were used by the contractor for the bidding process and ultimately the Construction phase. The project fitted out a total of 9,000 square feet; 4,000 laboratory and 5,000 office/support. Lab space includes areas for Prep, CT screening, sign out and Imaging. Adjacent space houses faculty offices and conferencing facilities. Transportation time was reduced (waste removal) by a Pneumatic Tube System, specimen drop window to Prep Lab and a pass thru window to the screening area. Open screening and prep areas allow visual management control. Efficiencies were gained by ergonomically placing CT Manual and Imaging microscopes and computers in close proximity, also facilitating a paperless workflow for additional savings. Logistically, closer proximity to Surgical Pathology maximized the natural synergies between the areas. Lab construction should be a systematic process based on sound principles for safety, high quality testing, and finance. Our detailed planning and design process can be a model for others undertaking similar projects.
Constructing a modern cytology laboratory: A toolkit for planning and design
Roberson, Janie; Wrenn, Allison; Poole, John; Jaeger, Andrew; Eltoum, Isam A.
2013-01-01
Introduction: Constructing or renovating a laboratory can be both challenging and rewarding. UAB Cytology (UAB CY) recently undertook a project to relocate from a building constructed in 1928 to new space. UAB CY is part of an academic center that provides service to a large set of patients, support training of one cytotechnology program and one cytopathology fellowship training program and involve actively in research and scholarly activity. Our objectives were to provide a safe, aesthetically pleasing space and gain efficiencies through lean processes. Methods: The phases of any laboratory design project are Planning, Schematic Design (SD), Design Development (DD), Construction Documents (CD) and Construction. Lab personnel are most critical in the Planning phase. During this time stakeholders, relationships, budget, square footage and equipment were identified. Equipment lists, including what would be relocated, purchased new and projected for future growth ensure that utilities were matched to expected need. A chemical inventory was prepared and adequate storage space was planned. Regulatory and safety requirements were discussed. Tours and high level process flow diagrams helped architects and engineers understand the laboratory daily work. Future needs were addressed through a questionnaire which identified potential areas of growth and technological change. Throughout the project, decisions were driven by data from the planning phase. During the SD phase, objective information from the first phase was used by architects and planners to create a general floor plan. This was the basis of a series of meetings to brainstorm and suggest modifications. DD brings more detail to the plans with engineering, casework, equipment specifics, finishes. Design changes should be completed at this phase. The next phase, CD took the project from the lab purview into purely technical mode. Construction documents were used by the contractor for the bidding process and ultimately the Construction phase. Results: The project fitted out a total of 9,000 square feet; 4,000 laboratory and 5,000 office/support. Lab space includes areas for Prep, CT screening, sign out and Imaging. Adjacent space houses faculty offices and conferencing facilities. Transportation time was reduced (waste removal) by a Pneumatic Tube System, specimen drop window to Prep Lab and a pass thru window to the screening area. Open screening and prep areas allow visual management control. Efficiencies were gained by ergonomically placing CT Manual and Imaging microscopes and computers in close proximity, also facilitating a paperless workflow for additional savings. Logistically, closer proximity to Surgical Pathology maximized the natural synergies between the areas. Conclusions: Lab construction should be a systematic process based on sound principles for safety, high quality testing, and finance. Our detailed planning and design process can be a model for others undertaking similar projects PMID:23599722
X-43C Flight Demonstrator Project Overview
NASA Technical Reports Server (NTRS)
Moses, Paul L.
2003-01-01
The X-43C Flight Demonstrator Project is a joint NASA-USAF hypersonic propulsion technology flight demonstration project that will expand the hypersonic flight envelope for air-breathing engines. The Project will demonstrate sustained accelerating flight through three flights of expendable X-43C Demonstrator Vehicles (DVs). The approximately 16-foot long X-43C DV will be boosted to the starting test conditions, separate from the booster, and accelerate from Mach 5 to Mach 7 under its own power and autonomous control. The DVs will be powered by a liquid hydrocarbon-fueled, fuel-cooled, dual-mode, airframe integrated scramjet engine system developed under the USAF HyTech Program. The Project is managed by NASA Langley Research Center as part of NASA's Next Generation Launch Technology Program. Flight tests will be conducted by NASA Dryden Flight Research Center off the coast of California over water in the Pacific Test Range. The NASA/USAF/industry project is a natural extension of the Hyper-X Program (X-43A), which will demonstrate short duration (approximately 10 seconds) gaseous hydrogen-fueled scramjet powered flight at Mach 7 and Mach 10 using a heavy-weight, largely heat sink construction, experimental engine. The X-43C Project will demonstrate sustained accelerating flight from Mach 5 to Mach 7 (approximately 4 minutes) using a flight-weight, fuel-cooled, scramjet engine powered by much denser liquid hydrocarbon fuel. The X-43C DV design flows from integrating USAF HyTech developed engine technologies with a NASA Air-Breathing Launch Vehicle accelerator-class configuration and Hyper-X heritage vehicle systems designs. This paper describes the X-43C Project and provides the background for NASA's current hypersonic flight demonstration efforts.
ERTS program of the US Army Corps of Engineers. [water resources
NASA Technical Reports Server (NTRS)
Jarman, J. W.
1974-01-01
The Army Corps of Engineers research and development efforts associated with the ERTS Program are confined to applications of investigation, design, construction, operation, and maintenance of water resource projects. Problems investigated covered: (1) resource inventory; (2) environmental impact; (3) pollution monitoring; (4) water circulation; (5) sediment transport; (6) data collection systems; (7) engineering; and (8) model verification. These problem areas were investigated in relation to bays, reservoirs, lakes, rivers, coasts, and regions. ERTS-1 imagery has been extremely valuable in developing techniques and is now being used in everyday applications.
Tools and Approaches for the Construction of Knowledge Models from the Neuroscientific Literature
Burns, Gully A. P. C.; Khan, Arshad M.; Ghandeharizadeh, Shahram; O’Neill, Mark A.; Chen, Yi-Shin
2015-01-01
Within this paper, we describe a neuroinformatics project (called “NeuroScholar,” http://www.neuroscholar.org/) that enables researchers to examine, manage, manipulate, and use the information contained within the published neuroscientific literature. The project is built within a multi-level, multi-component framework constructed with the use of software engineering methods that themselves provide code-building functionality for neuroinformaticians. We describe the different software layers of the system. First, we present a hypothetical usage scenario illustrating how NeuroScholar permits users to address large-scale questions in a way that would otherwise be impossible. We do this by applying NeuroScholar to a “real-world” neuroscience question: How is stress-related information processed in the brain? We then explain how the overall design of NeuroScholar enables the system to work and illustrate different components of the user interface. We then describe the knowledge management strategy we use to store interpretations. Finally, we describe the software engineering framework we have devised (called the “View-Primitive-Data Model framework,” [VPDMf]) to provide an open-source, accelerated software development environment for the project. We believe that NeuroScholar will be useful to experimental neuroscientists by helping them interact with the primary neuroscientific literature in a meaningful way, and to neuroinformaticians by providing them with useful, affordable software engineering tools. PMID:15055395
23 CFR 630.203 - Applicability.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 23 Highways 1 2013-04-01 2013-04-01 false Applicability. 630.203 Section 630.203 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS PRECONSTRUCTION... apply to all highway construction projects financed in whole or in part with Federal-aid highway funds...
23 CFR 630.203 - Applicability.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 23 Highways 1 2014-04-01 2014-04-01 false Applicability. 630.203 Section 630.203 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS PRECONSTRUCTION... apply to all highway construction projects financed in whole or in part with Federal-aid highway funds...
23 CFR 635.103 - Applicability.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 23 Highways 1 2014-04-01 2014-04-01 false Applicability. 635.103 Section 635.103 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS CONSTRUCTION AND... in this subpart shall apply to all Federal-aid highway projects. [69 FR 7118, Feb. 13, 2004] ...
23 CFR 635.103 - Applicability.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false Applicability. 635.103 Section 635.103 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS CONSTRUCTION AND... in this subpart shall apply to all Federal-aid highway projects. [69 FR 7118, Feb. 13, 2004] ...
23 CFR 635.103 - Applicability.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 23 Highways 1 2013-04-01 2013-04-01 false Applicability. 635.103 Section 635.103 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS CONSTRUCTION AND... in this subpart shall apply to all Federal-aid highway projects. [69 FR 7118, Feb. 13, 2004] ...
23 CFR 635.103 - Applicability.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 23 Highways 1 2012-04-01 2012-04-01 false Applicability. 635.103 Section 635.103 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS CONSTRUCTION AND... in this subpart shall apply to all Federal-aid highway projects. [69 FR 7118, Feb. 13, 2004] ...
23 CFR 630.203 - Applicability.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false Applicability. 630.203 Section 630.203 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS PRECONSTRUCTION... apply to all highway construction projects financed in whole or in part with Federal-aid highway funds...
23 CFR 630.203 - Applicability.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 23 Highways 1 2012-04-01 2012-04-01 false Applicability. 630.203 Section 630.203 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS PRECONSTRUCTION... apply to all highway construction projects financed in whole or in part with Federal-aid highway funds...
23 CFR 630.203 - Applicability.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false Applicability. 630.203 Section 630.203 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS PRECONSTRUCTION... apply to all highway construction projects financed in whole or in part with Federal-aid highway funds...
23 CFR 660.117 - Funding, records and accounting.
Code of Federal Regulations, 2010 CFR
2010-04-01
... Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS... be required. (b) Funds for FHs may be used for: (1) Planning; (2) Federal Lands Highway research; (3... construction project: (1) Transportation planning for tourism and recreational travel; (2) Adjacent vehicular...
Martínez-Aires, María Dolores; Rubio Gámez, María Carmen; Gibb, Alistair
2015-01-01
Since the mid-1990 s, Prevention through Design (PtD) has become increasingly prevalent in the built environment. The acceptance of PtD has largely been due to the removal or reduction of risks during the execution phase of construction projects. European States have had the added impetus of national legislation. This paper analyzes the influence of European Union Directive 92/57/EEC on occupational safety and health injury prevention in the project design phase. Qualitative methods comprised individual semi-structured interviews and focus groups with a panel of experts. Sixty individuals from construction and related professions (architects, engineers, constructors, developers, and other construction experts) answered 17 key questions to establish national perceptions of the effectiveness of Directive 92/57/EEC in Spain and the United Kingdom (UK). The implementation of PtD in the project design phase in the UK is clearer since the regulations explicitly state the obligations of project designers as well as those of the coordinator. Interviews with Spanish experts show that, in Spain, the prevention culture is less frequently realized. The most significant differences between the European Directive and national regulations which influence PtD are linked to the Health and Safety Coordinator, and Health and Safety documents.
Mega-Project Construction Management: The Corps of Engineers and Bechtel Group in Saudi Arabia
1991-02-01
collaborative efforts of government and private firms; utilizing state-of-the-art technology; and, having economic , sociocultural, and environmental impacts...pushing out their traditional managerial corps of stodgy engineers and aristocrats."LA Although I don’t focus on individual personalities in this...help from Western economists the Central Planning Organization created Saudi Arabia’s first five year economic plan, which covered the years 1970 to
2003-03-04
KENNEDY SPACE CENTER, FLA. -- -- Lifting their shovels for the groundbreaking of the Operations Support Building II are (left to right) Bill Pickavance, Vice President & Deputy Program Manager Florida Operations, United Space Alliance; Mike Wetmore, director of Shuttle Processing; Miguel Morales, chief, Facilities Division, Spaceport Services; Mike Sumner, chief of operations, Spaceport Services; David Wolfberg, designer of the facility, with Architect and Engineers Wolfberg, Alvarez and Partners of Coral Gables; Roy Bridges, KSC director; and Don Minderman, OSB II project manager, Spaceport Services. Not shown: David Boland, David Boland Inc.(construction company). The new building will replace modular housing constructed more than 20 years ago and house NASA and contractor support staff for shuttle operations. The demolition of the modular buildings has begun and construction will immediately follow. The new structure is projected to be ready in April 2005.
NASA Technical Reports Server (NTRS)
2003-01-01
KENNEDY SPACE CENTER, FLA. -- -- Lifting their shovels for the groundbreaking of the Operations Support Building II are (left to right) Bill Pickavance, Vice President & Deputy Program Manager Florida Operations, United Space Alliance; Mike Wetmore, director of Shuttle Processing; Miguel Morales, chief, Facilities Division, Spaceport Services; Mike Sumner, chief of operations, Spaceport Services; David Wolfberg, designer of the facility, with Architect and Engineers Wolfberg, Alvarez and Partners of Coral Gables; Roy Bridges, KSC director; and Don Minderman, OSB II project manager, Spaceport Services. Not shown: David Boland, David Boland Inc.(construction company). The new building will replace modular housing constructed more than 20 years ago and house NASA and contractor support staff for shuttle operations. The demolition of the modular buildings has begun and construction will immediately follow. The new structure is projected to be ready in April 2005.
SAGA: A project to automate the management of software production systems
NASA Technical Reports Server (NTRS)
Campbell, Roy H.; Laliberte, D.; Render, H.; Sum, R.; Smith, W.; Terwilliger, R.
1987-01-01
The Software Automation, Generation and Administration (SAGA) project is investigating the design and construction of practical software engineering environments for developing and maintaining aerospace systems and applications software. The research includes the practical organization of the software lifecycle, configuration management, software requirements specifications, executable specifications, design methodologies, programming, verification, validation and testing, version control, maintenance, the reuse of software, software libraries, documentation, and automated management.
Application of BIM technology in green scientific research office building
NASA Astrophysics Data System (ADS)
Ni, Xin; Sun, Jianhua; Wang, Bo
2017-05-01
BIM technology as a kind of information technology, has been along with the advancement of building industrialization application in domestic building industry gradually. Based on reasonable construction BIM model, using BIM technology platform, through collaborative design tools can effectively improve the design efficiency and design quality. Vanda northwest engineering design and research institute co., LTD., the scientific research office building project in combination with the practical situation of engineering using BIM technology, formed in the BIM model combined with related information according to the energy energy model (BEM) and the application of BIM technology in construction management stage made exploration, and the direct experience and the achievements gained by the architectural design part made a summary.
Evaluation of Lightweight, Relocatable Structures for Use in Theaters of Operations.
1982-05-01
ADA117 02& CONSTRUCTION ENGINEERING RESEARCH LAB (ARMY) CHAMPAIGN IL F/6 13/2EVALUATION OF LI HThEISHT, RELOCATABLE STRUCTURES FOR USE IN TH-ETC(U...NUMBER(s) M. Frisch J. LambertM._ Ptak 9. PERFORMING ORGANIZATION NAME AND ADDRESS 10. PROGRAM ELEMENT. PROJECT, TASK U.S. ARMY 4A 6 - T CONSTRUCTION ...System prefabricated buildings portable shelters 24L A2rRACT (C60901we S ,ewInd efb nOee -e and ldenif 7 by block numbe) The U.S. Army Construction
ARCS A wide-Anglular Range Chopper Spectrometer at the SNS
DOE Office of Scientific and Technical Information (OSTI.GOV)
Prof. Brent Fultz; Dr. Doug Abernathy
The ARCS spectrometer project has been funded for 39 months. Procurements are now amain activity, although engineering effort remains, and installation has begun. Most of the subsystems are under control, and represent no risk to the project. These are: cryo-goniometer, detectors and electronics, Fermi chopper system, computing cluster, basic reduction software, T0 chopper and main neutron guide. The sample hutch and radiationshielding are still items of some risk. At the time of this writing, we are awaiting vendor proposals for the scattering chamber with integrated sample isolation system. This is thelargest uncertainty in the ARCS project today. The ARCS Chiefmore » Engineer, Kevin Shaw, joined the project in 2004. Project controlsservices are now performed by the SNS. A construction progress review was held in the August, 2004, before which the project was rebaselined, and after which the ProjectExecution Plan was updated. The ARCS project will be rebaselined in March 2005 after a vendor is selected for the scattering chamber with integrated isolation system. Projectcompletion by Sept. 2006 is possible but challenging.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
2004-06-01
This guide was prepared to be a resource for federal construction project managers and others who want to integrate the principles of sustainable design into the procurement of professional building design and consulting services. To economize on energy costs and improve the safety, comfort, and health of building occupants, building design teams can incorporate daylighting, energy efficiency, renewable energy, and passive solar design into all projects in which these elements are technically and economically feasible. The information presented here will help project leaders begin the process and manage the inclusion of sustainable design in the procurement process. The section onmore » establishing selection criteria contains key elements to consider before selecting an architectural and engineering (A/E) firm. The section on preparing the statement of work discusses the broad spectrum of sustainable design services that an A/E firm can provide. Several helpful checklists are included.« less
Design and construction of the Discovery Channel Telescope enclosure
NASA Astrophysics Data System (ADS)
Marshall, Heather K.; Teran, Jose U.; Bond, Kevin
2010-07-01
The Discovery Channel Telescope (DCT) is a project of Lowell Observatory, undertaken with support from Discovery Communications, Inc., to design and construct a 4-meter class telescope and support facility on a site approximately 40 miles southeast of Flagstaff, Arizona. The Discovery Channel Telescope Enclosure was completed in November, 2009. The DCT Enclosure is an octagonal steel structure with insulated composite panel skin. The structure rotates on sixteen compliant bogie assemblies attached to the stationary facility. The shutter is composed of two independently actuated, bi-parting structures that provide a viewing aperture. To improve seeing, the skin is covered with adhesive aluminum foil tape and the enclosed observing area is passively ventilated via rollup doors. The observing area can also be actively ventilated using a downdraft fan, and there are provisions for upgrades to active air conditioning. The enclosure also includes operational equipment such as a bridge crane, personnel lift, and access platforms. This paper discusses some of the design trades as well as the construction challenges and lessons learned by the DCT Project, its designer M3 Engineering and Technology Corporation (M3), and its general contractor, Building and Engineering Contractors, Southwest (BEC Southwest).
Dynamic Metabolic Model Building Based on the Ensemble Modeling Approach
DOE Office of Scientific and Technical Information (OSTI.GOV)
Liao, James C.
2016-10-01
Ensemble modeling of kinetic systems addresses the challenges of kinetic model construction, with respect to parameter value selection, and still allows for the rich insights possible from kinetic models. This project aimed to show that constructing, implementing, and analyzing such models is a useful tool for the metabolic engineering toolkit, and that they can result in actionable insights from models. Key concepts are developed and deliverable publications and results are presented.
MASS TRANSIT: FTA Could Relieve New Starts Program Funding Constraints
2001-08-01
progress through a local or regional review of alternatives, develop preliminary engineering plans , and obtain FTA’s approval for final design.7 TEA-21...and transit programs can also be used to develop, plan , and/or construct these projects. 7The alternatives analysis stage provides information on the...include right-of-way acquisition, utility relocation, and the preparation of final construction plans and cost estimates. Background Page 5 GAO-01-987 New
Offsets in International Weapons Acquisitions: The Turkish Experience
2002-03-01
future civilian needs, a contract was signed with CASA ( Construcciones Aeronauticas SA) of Spain in 1990 for the joint production of 52 CN-235...housed in a large, newly constructed factory, was to assemble and co-produce the F-16 in Turkiye, and to provide support for the program including...project in Turkiye with Bechtel, the giant U.S. engineering and construction firm based in San Francisco. General Dynamics invested about $20 million
DOT National Transportation Integrated Search
2012-08-01
Material characterization is a critical component of modern day pavement analysis, design, construction, quality : control/quality assurance, management, and rehabilitation. At each stage during the life of a project, the influence of : several funda...
Analysis of change orders in geotechnical engineering work at INDOT : [technical summary].
DOT National Transportation Integrated Search
2011-01-01
There was a perception at INDOT that the number of change orders connected with geotechnical work was excessive, and that, as a consequence, geotechnical projects were not completed on time or within budget. It was reported that INDOT construction pr...
23 CFR 635.405 - Applicability.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 23 Highways 1 2014-04-01 2014-04-01 false Applicability. 635.405 Section 635.405 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS CONSTRUCTION AND... in this subpart apply to all contracts relating to Federal-aid highway projects. [69 FR 7119, Feb. 13...
23 CFR 635.405 - Applicability.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false Applicability. 635.405 Section 635.405 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS CONSTRUCTION AND... in this subpart apply to all contracts relating to Federal-aid highway projects. [69 FR 7119, Feb. 13...
23 CFR 635.405 - Applicability.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false Applicability. 635.405 Section 635.405 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS CONSTRUCTION AND... in this subpart apply to all contracts relating to Federal-aid highway projects. [69 FR 7119, Feb. 13...
23 CFR 635.405 - Applicability.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 23 Highways 1 2012-04-01 2012-04-01 false Applicability. 635.405 Section 635.405 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS CONSTRUCTION AND... in this subpart apply to all contracts relating to Federal-aid highway projects. [69 FR 7119, Feb. 13...
23 CFR 635.405 - Applicability.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 23 Highways 1 2013-04-01 2013-04-01 false Applicability. 635.405 Section 635.405 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS CONSTRUCTION AND... in this subpart apply to all contracts relating to Federal-aid highway projects. [69 FR 7119, Feb. 13...
78 FR 10214 - Records Schedules; Availability and Request for Comments
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-13
... related to grants, land surveys, and engineering, geospatial, and road construction projects. 3... Management Services (ACNR) using one of the following means: Mail: NARA (ACNR), 8601 Adelphi Road, College...), National Archives and Records Administration, 8601 Adelphi Road, College Park, MD 20740-6001. Telephone...
33 CFR 263.15 - Program policies.
Code of Federal Regulations, 2010 CFR
2010-07-01
... of the number of project purposes served. Normally, only one authority will be used for each study... undertaken, without regard to time. (b) Applicability of costs to Federal and non-Federal shares. Unless... Corps of Engineers costs for investigations, design, and construction (including costs of supervision...
33 CFR 263.15 - Program policies.
Code of Federal Regulations, 2011 CFR
2011-07-01
... of the number of project purposes served. Normally, only one authority will be used for each study... undertaken, without regard to time. (b) Applicability of costs to Federal and non-Federal shares. Unless... Corps of Engineers costs for investigations, design, and construction (including costs of supervision...
33 CFR 263.15 - Program policies.
Code of Federal Regulations, 2014 CFR
2014-07-01
... of the number of project purposes served. Normally, only one authority will be used for each study... undertaken, without regard to time. (b) Applicability of costs to Federal and non-Federal shares. Unless... Corps of Engineers costs for investigations, design, and construction (including costs of supervision...
ENGINEERING AND CONSTRUCTING THE HALLAM NUCLEAR POWER FACILITY REACTOR STRUCTURE
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mahlmeister, J E; Haberer, W V; Casey, D F
1960-12-15
The Hallam Nuclear Power Facility reactor structure, including the cavity liner, is described, and the design philosophy and special design requirements which were developed during the preliminary and final engineering phases of the project are explained. The structure was designed for 600 deg F inlet and 1000 deg F outlet operating sodium temperatures and fabricated of austenitic and ferritic stainless steels. Support for the reactor core components and adequate containment for biological safeguards were readily provided even though quite conservative design philosophy was used. The calculated operating characteristics, including heat generation, temperature distributions and stress levels for full-power operation, aremore » summarized. Ship fabrication and field installation experiences are also briefly related. Results of this project have established that the sodium graphite reactor permits practical and economical fabrication and field erection procedures; considerably higher operating design temperatures are believed possible without radical design changes. Also, larger reactor structures can be similarly constructed for higher capacity (300 to 1000 Mwe) nuclear power plants. (auth)« less
North American tidal power prospects
NASA Astrophysics Data System (ADS)
Wayne, W. W., Jr.
1981-07-01
Prospects for North American tidal power electrical generation are reviewed. Studies by the US Army Corps of Engineers of 90 possible generation schemes in Cobscook Bay, ME, indicated that maximum power generation rather than dependable capacity was the most economic method. Construction cost estimates for 15 MW bulb units in a single effect mode from basin to the sea are provided; five projects were considered ranging from 110-160 MW. Additional tidal power installations are examined for: Half-Moon Cove, ME (12 MW, 18 ft tide); Cook Inlet, AK, which is shown to pose severe environmental and engineering problems due to fish migration, earthquake hazards, and 300 ft deep silt deposits; and the Bay of Fundy, Canada. This last has a 17.8 MW plant under construction in a 29 ft maximum tide area. Other tidal projects of the Maritime Provinces are reviewed, and it is noted that previous economic evaluations based on an oil price of $16/barrel are in need of revision.
Overview of the Center for Space Construction
NASA Technical Reports Server (NTRS)
Hearth, Donald P.
1990-01-01
The purpose of this overview is to summarize the objectives and structure of the Center. The center is a major element of the University's initiative to upgrade space-related research and education on the Boulder campus. With the support of NASA's University Space Engineering Research Centers Program, we provide a mechanism for interdisciplinary and system-level space engineering research and training. Twenty faculty members and 56 students from seven academic units are associated with the Center and are interacting with each other and with the CSC Associates. As a result of feedback from the 1989 symposium, we have focused the efforts of the Center during the past several months on Lunar Base construction. This included a system level study of a Lunar Base in an Independent Study Project by a group of students from across the Center during the spring semester. This project is being continued this fall. During the two-year history of the Center, 13 students previously affiliated with the Center have graduated and there have been 55 publications from the Center.
Managing large energy and mineral resources (EMR) projects in challenging environments
NASA Astrophysics Data System (ADS)
Chanmeka, Arpamart
The viability of energy mineral resources (EMR) construction projects is contingent upon the state of the world economic climate. Oil sands projects in Alberta, Canada exemplify large EMR projects that are highly sensitive to fluctuations in the world market. Alberta EMR projects are constrained by high fixed production costs and are also widely recognized as one of the most challenging construction projects to successfully deliver due to impacts from extreme weather conditions, remote locations and issues with labor availability amongst others. As indicated in many studies, these hardships strain the industry's ability to execute work efficiently, resulting in declining productivity and mounting cost and schedule overruns. Therefore, to enhance the competitiveness of Alberta EMR projects, project teams are targeting effective management strategies to enhance project performance and productivity by countering the uniquely challenging environment in Alberta. The main purpose of this research is to develop industry wide benchmarking tailored to the specific constraints and challenges of Alberta. Results support quantitative assessments and identify the root causes of project performance and ineffective field productivity problems in the heavy industry sector capital projects. Customized metrics produced from the data collected through a web-based survey instrument were used to quantitatively assess project performance in the following dimensions: cost, schedule, change, rework, safety, engineering and construction productivity and construction practices. The system enables the industry to measure project performance more accurately, get meaningful comparisons, while establishing credible norms specific to Alberta projects. Data analysis to identify the root cause of performance problems was conducted. The analysis of Alberta projects substantiated lessons of previous studies to create an improved awareness of the abilities of Alberta-based companies to manage their unique projects. This investigation also compared Alberta-based projects with U.S. projects to point out the differences in project process and management strategies under different environments. The relative impact of factors affecting construction productivity were identified and validated by the input from industry experts. The findings help improve the work processes used by companies developing projects in Alberta.
Building a pipeline of talent for operating radio observatories
NASA Astrophysics Data System (ADS)
Wingate, Lory M.
2016-07-01
The National Radio Astronomy Observatory's (NRAO) National and International Non-Traditional Exchange (NINE) Program teaches concepts of project management and systems engineering in a focused, nine-week, continuous effort that includes a hands-on build project with the objective of constructing and verifying the performance of a student-level basic radio instrument. The combination of using a project management (PM)/systems engineering (SE) methodical approach based on internationally recognized standards in completing this build is to demonstrate clearly to the learner the positive net effects of following methodical approaches to achieving optimal results. It also exposes the learner to basic radio science theory. An additional simple research project is used to impress upon the learner both the methodical approach, and to provide a basic understanding of the functional area of interest to the learner. This program is designed to teach sustainable skills throughout the full spectrum of activities associated with constructing, operating and maintaining radio astronomy observatories. NINE Program learners thereby return to their host sites and implement the program in their own location as a NINE Hub. This requires forming a committed relationship (through a formal Letter of Agreement), establishing a site location, and developing a program that takes into consideration the needs of the community they represent. The anticipated outcome of this program is worldwide partnerships with fast growing radio astronomy communities designed to facilitate the exchange of staff and the mentoring of under-represented1 groups of learners, thereby developing a strong pipeline of global talent to construct, operate and maintain radio astronomy observatories.
Space Station Facility government estimating
NASA Technical Reports Server (NTRS)
Brown, Joseph A.
1993-01-01
This new, unique Cost Engineering Report introduces the 800-page, C-100 government estimate for the Space Station Processing Facility (SSPF) and Volume IV Aerospace Construction Price Book. At the January 23, 1991, bid opening for the SSPF, the government cost estimate was right on target. Metric, Inc., Prime Contractor, low bid was 1.2 percent below the government estimate. This project contains many different and complex systems. Volume IV is a summary of the cost associated with construction, activation and Ground Support Equipment (GSE) design, estimating, fabrication, installation, testing, termination, and verification of this project. Included are 13 reasons the government estimate was so accurate; abstract of bids, for 8 bidders and government estimate with additive alternates, special labor and materials, budget comparison and system summaries; and comments on the energy credit from local electrical utility. This report adds another project to our continuing study of 'How Does the Low Bidder Get Low and Make Money?' which was started in 1967, and first published in the 1973 AACE Transaction with 18 ways the low bidders get low. The accuracy of this estimate proves the benefits of our Kennedy Space Center (KSC) teamwork efforts and KSC Cost Engineer Tools which are contributing toward our goals of the Space Station.
NASA Technical Reports Server (NTRS)
1983-01-01
The Flat Plate Solar Array Project, focuses on advancing technologies relevant to the design and construction of megawatt level central station systems. Photovoltaic modules and arrays for flat plate central station or other large scale electric power production facilities require the establishment of a technical base that resolves design issues and results in practical and cost effective configurations. Design, qualification and maintenance issues related to central station arrays derived from the engineering and operating experiences of early applications and parallel laboratory reserch activities are investigated. Technical issues are examined from the viewpoint of the utility engineer, architect/engineer and laboratory researcher. Topics on optimum source circuit designs, module insulation design for high system voltages, array safety, structural interface design, measurements, and array operation and maintenance are discussed.
Study on the Selection of Equipment Suppliers for Wind Power Generation EPC Project
NASA Astrophysics Data System (ADS)
Yang, Yuanyue; Li, Huimin
2017-12-01
In the EPC project, the purchase cost of equipments accounted for about 60% of the total project cost, thus, the selection of equipment suppliers has an important influence on the EPC project. This paper, took EPC project for the phase I engineering of Guizhou Huaxi Yunding wind power plant as research background, constructed the evaluation index system for the selection of equipment suppliers for wind power generation EPC project from multiple perspectives, and introduced matter-element extension evaluation model to evaluate the selection of equipment suppliers for this project from the qualitative and quantitative point of view. The result is consistent with the actual situation, which verifies the validity and operability of this method.
Solar 2 Green Energy, Arts & Education Center. Final Scientific/Technical Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Paquette, Jamie C; Collins, Christopher J
The Solar 2 Green Energy, Arts and Education Center is an 8,000 sq.ft. demonstration project that will be constructed to Platinum LEED certification and will be the first carbon-neutral, net-zero energy use public building in New York City, giving it local and national appeal. Employing green building features and holistic engineering practices throughout its international award-winning design, Solar 2 will be powered by a 90kW photovoltaic (PV) array in conjunction with a geothermal heating and cooling system and a high efficient design that seeks to reduce the overall energy load of the building. Solar 2 will replace our current 500more » sq.ft. prototype facility - known as Solar 1 - as the educational and cultural centerpiece of a five-block public greenway on the East River in Stuyvesant Cove Park, located along two acres of public riverfront on a newly reclaimed, former brownfield in lower Manhattan. Designed as a public-use complex for year-round environmental education exhibits and onsite activities for all ages and backgrounds, Solar 2 will demonstrate energy-efficiency technologies and sustainable environmental practices available now to all urban residents, eco-tourists, teachers, and students alike. Showcasing one of Solar 2's most striking design elements is the PV roof array with a cafe and river vistas for miles of New York City's skylines. Capping the building as a solar-powered landmark, and visible from the FDR Drive, the PV array is also designed to provide visitors below a view of the solar roof when standing outside, as well as directly underneath it. Recognized by an international jury of architects, civil engineers and urban designers by the Swiss-based Holcim Foundation, the Solar 2 design was awarded the prestigious Holcim North American 2008 Gold Award for Sustainable Construction for innovative, future-oriented and tangible sustainable construction projects, selected from more than 1900 entries. Funding from the Department of Energy was provided to assist with the ongoing design work of Solar 2, including architecture, engineering and the development of construction specifications. The work performed during the project period brought this process as far along as it could go pending the raising of funds to begin construction of the building. Once those funds are secured, we will finalize any additional details needed before beginning the bidding process and then moving into construction. DOE's funding was extremely valuable in helping Solar One determine the feasibility of a net-zero construction on the site and allowed for the design to project to meet the high standards necessary for LEED Platinum status.« less
Southeast geysers effluent pipeline project. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dellinger, M.
1998-01-15
The project concept originated in 1990 with the convergence of two problems: (1) a need for augmented injection to mitigate declining reservoir productivity at the Geysers; and (2) a need for a new method of wastewater disposal for Lake County communities near the The Geysers. A public/private partnership of Geysers operators and the Lake County Sanitation District (LACOSAN) was formed in 1991 to conduct a series of engineering, environmental, and financing studies of transporting treated wastewater effluent from the communities to the southeast portion of The Geysers via a 29-mile pipeline. By 1994, these evaluations concluded that the concept wasmore » feasible and the stakeholders proceeded to formally develop the project, including pipeline and associated facilities design; preparation of an environmental impact statement; negotiation of construction and operating agreements; and assembly of $45 million in construction funding from the stakeholders, and from state and federal agencies with related program goals. The project development process culminated in the system`s dedication on October 16, 1997. As of this writing, all project components have been constructed or installed, successfully tested in compliance with design specifications, and are operating satisfactorily.« less
Cable Television in Detroit; A Study in Urban Communications.
ERIC Educational Resources Information Center
Detroit Cable T. V. Study Committee, MI.
The Cable TV Study Committee of the Common Council of Detroit, Michigan studied in depth the possibilities, requirements, and implications of cable television for Detroit. Their detailed recommendations are presented, covering financing and construction, the need for engineering and financial projections, organization for operation, channel…
Teaching Sustainable Design Using BIM and Project-Based Energy Simulations
ERIC Educational Resources Information Center
Shen, Zhigang; Jensen, Wayne; Wentz, Timothy; Fischer, Bruce
2012-01-01
The cross-disciplinary nature of energy-efficient building design has created many challenges for architecture, engineering and construction instructors. One of the technical challenges in teaching sustainable building design is enabling students to quantitatively understand how different building designs affect a building's energy performance.…
CREATION OF A MULTIDISCIPLINARY PROJECT PLATFORM FOR WATER SYSTEMS IN DEVELOPING COUNTRIES
The Lehigh University chapter of Engineers Without Borders-USA will design and construct a sustainable, multi-phase system for the treatment and distribution of drinking water in Pueblo Nuevo, Honduras. The new system will include a slow sand filter, hypochlorinator, water sto...
In Brief: Revitalizing Earth science education
NASA Astrophysics Data System (ADS)
Showstack, Randy
2008-12-01
A 5-year, $3.9-million U.S. National Science Foundation Math Science Partnership grant to Michigan Technological University (MTU), in Houghton, aims to improve instruction in middle-school Earth and space science courses. The program will enable geoscience and education researchers to work with middle-school science teachers to test strategies designed to reform science, technology, engineering, and math (STEM) education. Project lead researcher Bill Rose said the project could be a template for improvement in STEM throughout the United States. Rose, one of seven MTU faculty members involved with the Michigan Institute for Teaching Excellence Program (MITEP), said the project is ``trying to do something constructive to attract more talented young people to advanced science, math, and technology.'' The project includes data collection and analysis overseen by an evaluation team from the Colorado School of Mines. Also participating in the project are scientists from Grand Valley State University, Allendale, Mich.; the Grand Rapids (Mich.) Area Pre-College Engineering Program; the American Geological Institute; and the U.S. National Park Service.
Research on the optimization of quota design in real estate
NASA Astrophysics Data System (ADS)
Sun, Chunling; Ma, Susu; Zhong, Weichao
2017-11-01
Quota design is one of the effective methods of cost control in real estate development project and widely used in the current real estate development project to control the engineering construction cost, but quota design have many deficiencies in design process. For this purpose, this paper put forward a method to achieve investment control of real estate development project, which combine quota design and value engineering(VE) at the stage of design. Specifically, it’s an optimizing for the structure of quota design. At first, determine the design limits by investment estimate value, then using VE to carry on initial allocation of design limits and gain the functional target cost, finally, consider the whole life cycle cost (LCC) and operational problem in practical application to finish complex correction for the functional target cost. The improved process can control the project cost more effectively. It not only can control investment in a certain range, but also make the project realize maximum value within investment.
Design and construction of a remote piloted flying wing. B.S. Thesis
NASA Technical Reports Server (NTRS)
Costa, Alfred J.; Koopman, Fritz; Soboleski, Craig; Trieu, Thai-Ba; Duquette, Jaime; Krause, Scott; Susko, David; Trieu, Thuyba
1994-01-01
Currently, there is a need for a high-speed, high-lift civilian transport. Although unconventional, a flying wing could fly at speeds in excess of Mach 2 and still retain the capacity of a 747. The design of the flying wing is inherently unstable since it lacks a fuselage and a horizontal tail. The project goal was to design, construct, fly, and test a remote-piloted scale model flying wing. The project was completed as part of the NASA/USRA Advanced Aeronautics Design Program. These unique restrictions required us to implement several fundamental design changes from last year's Elang configuration including wing sweepback and wingtip endplates. Unique features such as a single ducted fan engine, composite structural materials, and an electrostatic stability system were incorporated. The result is the Banshee '94. Our efforts will aid future projects in design and construction techniques so that a viable flying wing can become an integral part of the aviation industry.
Label free cell tracking in 3D tissue engineering constructs with high resolution imaging
NASA Astrophysics Data System (ADS)
Smith, W. A.; Lam, K.-P.; Dempsey, K. P.; Mazzocchi-Jones, D.; Richardson, J. B.; Yang, Y.
2014-02-01
Within the field of tissue engineering there is an emphasis on studying 3-D live tissue structures. Consequently, to investigate and identify cellular activities and phenotypes in a 3-D environment for all in vitro experiments, including shape, migration/proliferation and axon projection, it is necessary to adopt an optical imaging system that enables monitoring 3-D cellular activities and morphology through the thickness of the construct for an extended culture period without cell labeling. This paper describes a new 3-D tracking algorithm developed for Cell-IQ®, an automated cell imaging platform, which has been equipped with an environmental chamber optimized to enable capturing time-lapse sequences of live cell images over a long-term period without cell labeling. As an integral part of the algorithm, a novel auto-focusing procedure was developed for phase contrast microscopy equipped with 20x and 40x objectives, to provide a more accurate estimation of cell growth/trajectories by allowing 3-D voxels to be computed at high spatiotemporal resolution and cell density. A pilot study was carried out in a phantom system consisting of horizontally aligned nanofiber layers (with precise spacing between them), to mimic features well exemplified in cellular activities of neuronal growth in a 3-D environment. This was followed by detailed investigations concerning axonal projections and dendritic circuitry formation in a 3-D tissue engineering construct. Preliminary work on primary animal neuronal cells in response to chemoattractant and topographic cue within the scaffolds has produced encouraging results.
Berne, Rosalyn W; Raviv, Daniel
2004-04-01
This paper introduces the Eight Dimensional Methodology for Innovative Thinking (the Eight Dimensional Methodology), for innovative problem solving, as a unified approach to case analysis that builds on comprehensive problem solving knowledge from industry, business, marketing, math, science, engineering, technology, arts, and daily life. It is designed to stimulate innovation by quickly generating unique "out of the box" unexpected and high quality solutions. It gives new insights and thinking strategies to solve everyday problems faced in the workplace, by helping decision makers to see otherwise obscure alternatives and solutions. Daniel Raviv, the engineer who developed the Eight Dimensional Methodology, and paper co-author, technology ethicist Rosalyn Berne, suggest that this tool can be especially useful in identifying solutions and alternatives for particular problems of engineering, and for the ethical challenges which arise with them. First, the Eight Dimensional Methodology helps to elucidate how what may appear to be a basic engineering problem also has ethical dimensions. In addition, it offers to the engineer a methodology for penetrating and seeing new dimensions of those problems. To demonstrate the effectiveness of the Eight Dimensional Methodology as an analytical tool for thinking about ethical challenges to engineering, the paper presents the case of the construction of the Large Binocular Telescope (LBT) on Mount Graham in Arizona. Analysis of the case offers to decision makers the use of the Eight Dimensional Methodology in considering alternative solutions for how they can proceed in their goals of exploring space. It then follows that same process through the second stage of exploring the ethics of each of those different solutions. The LBT project pools resources from an international partnership of universities and research institutes for the construction and maintenance of a highly sophisticated, powerful new telescope. It will soon mark the erection of the world's largest and most powerful optical telescope, designed to see fine detail otherwise visible only from space. It also represents a controversial engineering project that is being undertaken on land considered to be sacred by the local, native Apache people. As presented, the case features the University of Virginia, and its challenges in consideration of whether and how to join the LBT project consortium.
Methodology for quantification of waste generated in Spanish railway construction works
DOE Office of Scientific and Technical Information (OSTI.GOV)
Guzman Baez, Ana de; Villoria Saez, Paola; Rio Merino, Mercedes del
Highlights: Black-Right-Pointing-Pointer Two equations for C and D waste estimation in railway construction works are developed. Black-Right-Pointing-Pointer Mixed C and D waste is the most generated category during railway construction works. Black-Right-Pointing-Pointer Tunnel construction is essential to quantify the waste generated during the works. Black-Right-Pointing-Pointer There is a relationship between C and D waste generated and railway functional units. Black-Right-Pointing-Pointer The methodology proposed can be used to obtain new constants for other areas. - Abstract: In the last years, the European Union (EU) has been focused on the reduction of construction and demolition (C and D) waste. Specifically, in 2006,more » Spain generated roughly 47 million tons of C and D waste, of which only 13.6% was recycled. This situation has lead to the drawing up of many regulations on C and D waste during the past years forcing EU countries to include new measures for waste prevention and recycling. Among these measures, the mandatory obligation to quantify the C and D waste expected to be originated during a construction project is mandated. However, limited data is available on civil engineering projects. Therefore, the aim of this research study is to improve C and D waste management in railway projects, by developing a model for C and D waste quantification. For this purpose, we develop two equations which estimate in advance the amount, both in weight and volume, of the C and D waste likely to be generated in railway construction projects, including the category of C and D waste generated for the entire project.« less
Design and development of a cross-cultural disposition inventory
NASA Astrophysics Data System (ADS)
Davies, Randall; Zaugg, Holt; Tateishi, Isaku
2015-01-01
Advances in technology have increased the likelihood that engineers will have to work in a global, culturally diverse setting. Many schools of engineering are currently revising their curricula to help students to develop cultural competence. However, our ability to measure cultural dispositions can be a challenge. The purpose of this project was to develop and test an instrument that measures the various aspects of cultural disposition. The results of the validation process verified that the hypothesised model adequately represented the data. The refined instrument produced a four-factor model for the overall construct. The validation process for the instrument verified the existence of specific subcomponents that form the overall cultural disposition construct. There also seems to be a hierarchical relationship within the subcomponents of cultural disposition. Additional research is needed to explore which aspects of cultural disposition affect an individual's ability to work effectively in a culturally diverse engineering team.
NASA Astrophysics Data System (ADS)
Rooch, Aeneas; Junker, Philipp; Härterich, Jörg; Hackl, Klaus
2016-03-01
Too difficult, too abstract, too theoretical - many first-year engineering students complain about their mathematics courses. The project MathePraxis aims to resolve this disaffection. It links mathematical methods as they are taught in the first semesters with practical problems from engineering applications - and thereby shall give first-year engineering students a vivid and convincing impression of where they will need mathematics in their later working life. But since real applications usually require more than basic mathematics and first-year engineering students typically are not experienced with construction, mensuration and the use of engineering software, such an approach is hard to realise. In this article, we show that it is possible. We report on the implementation of MathePraxis at Ruhr-Universität Bochum. We describe the set-up and the implementation of a course on designing a mass damper which combines basic mathematical techniques with an impressive experiment. In an accompanying evaluation, we have examined the students' motivation relating to mathematics. This opens up new perspectives how to address the need for a more practically oriented mathematical education in engineering sciences.
An Operations Concept for Integrated Model-Centric Engineering at JPL
NASA Technical Reports Server (NTRS)
Bayer, Todd J.; Cooney, Lauren A.; Delp, Christopher L.; Dutenhoffer, Chelsea A.; Gostelow, Roli D.; Ingham, Michel D.; Jenkins, J. Steven; Smith, Brian S.
2010-01-01
As JPL's missions grow more complex, the need for improved systems engineering processes is becoming clear. Of significant promise in this regard is the move toward a more integrated and model-centric approach to mission conception, design, implementation and operations. The Integrated Model-Centric Engineering (IMCE) Initiative, now underway at JPL, seeks to lay the groundwork for these improvements. This paper will report progress on three fronts: articulating JPL's need for IMCE; characterizing the enterprise into which IMCE capabilities will be deployed; and constructing an operations concept for a flight project development in an integrated model-centric environment.
1981-03-01
to retain some of its aesthetic quality. Important bridges were also being constructed outside of France. The Westminister Bridge (1738-50) was built... Legislative Session. It was eventually to connect the waters of Mobile Bay with the Coosa River at Wetumpka, and eventually with the Tennessee. The project...Bridge Act of 1927 were important legislative aids. The state act resulted in the construction of fifteen major bridges, including the attractive
The challenge of logistics facilities development
NASA Technical Reports Server (NTRS)
Davis, James R.
1987-01-01
The paper discusses the experiences of a group of engineers and logisticians at John F. Kennedy Space center in the design, construction and activation of a consolidated logistics facility for support of Space Transportation System ground operations and maintenance. The planning, methodology and processes are covered, with emphasis placed on unique aspects and lessons learned. The project utilized a progressive design, baseline and build concept for each phase of construction, with the Government exercising funding and configuration oversight.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Neilson, G. H.; Heitzenroeder, P.; Lyon, J.
Stellarators use 3D plasma and magnetic field shaping to produce a steady-state disruption-free magnetic confinement configuration. Compact stellarators have additional attractive properties — quasi-symmetric magnetic fields and low aspect ratio. The National Compact Stellarator Experiment (NCSX) is being constructed at the Princeton Plasma Physics Laboratory (PPPL) in partnership with the Oak Ridge National Laboratory (ORNL) to test the physics of a high-beta compact stellarator with a lowripple, tokamak-like magnetic configuration. The engineering challenges of NCSX stem from its complex geometry requirements. These issues are addressed in the construction project through manufacturing R&D and system engineering. As a result, the fabricationmore » of the coil winding forms and vacuum vessel are proceeding in industry without significant technical issues, and preparations for winding the coils at PPPL are in place. Design integration, analysis, and dimensional control are functions provided by system engineering to ensure that the finished product will satisfy the physics requirements, especially accurate realization of the specified coil geometries. After completion of construction in 2009, a research program to test the expected physics benefits will start.« less
NASA Technical Reports Server (NTRS)
Robertson, Glen A.
2013-01-01
NASA currently has a program called the Space Synthetic Biology Project. Synthetic Biology or SynBio is the design and construction of new biological functions and systems not found in nature. Four NASA field centers, along with experts from industry and academia, have been partnering on the Space Synthetic Biology Project and are working on new breakthroughs in this increasingly useful pursuit, which is part a science discipline and part engineering. Led by researchers at NASA s Ames Research Center, the team is studying how this powerful new tool can help NASA now and in the future. The project was created to harness biology in reliable, robust, engineered systems to support the agency s exploration and science missions, to improve life on Earth and to help shape NASA's future. The program also is intended to contribute foundational tools to the synthetic biology research community.
Wallace, R.E.; Bucknam, R.C.; Hanks, T.C.
1994-01-01
Two major construction projects of ancient times in China involved what today would be considered engineering geology. We describe an ancient canal system in Gaotai County, Gansu province that was possibly begun in the Han dynasty (206 BC-220 AD). The canal system heads at the Dasha River and extends northwestward for about 55 km to the City of Camels and Xusanwan village. Four parallel canals are present at the local site we examined. The canals were likely built primarily to transport water but may also have served as defensive military barriers. A second project involves trenches and berms along the north side of the Great Wall, clearly part of the Great Wall defensive system. This site is in Ningxia Autonomous Region near the town of Shizuishan. ?? 1994.
Engineering monitoring expert system's developer
NASA Technical Reports Server (NTRS)
Lo, Ching F.
1991-01-01
This research project is designed to apply artificial intelligence technology including expert systems, dynamic interface of neural networks, and hypertext to construct an expert system developer. The developer environment is specifically suited to building expert systems which monitor the performance of ground support equipment for propulsion systems and testing facilities. The expert system developer, through the use of a graphics interface and a rule network, will be transparent to the user during rule constructing and data scanning of the knowledge base. The project will result in a software system that allows its user to build specific monitoring type expert systems which monitor various equipments used for propulsion systems or ground testing facilities and accrues system performance information in a dynamic knowledge base.
Analysis on Key Points of Construction and Management of Municipal Landscape Engineering
NASA Astrophysics Data System (ADS)
Liang, Mingxia; Fei, Cheng
2018-02-01
At present, China has made great efforts to promote the construction of ecological civilization and promote the development of ecological protection and environmental construction. It has important practical significance to maintain the ecological balance and environmental quality of our country. Especially with the gradual improvement in people’s awareness of environmental protection, so that the green of the city also put forward higher requirements at the same time with the rising of the level of urbanization. In the process of urban landscape construction, the rational planning of urban landscaping involves a lot of subject knowledge. In the green process, we should fully consider the system of urban development and construction in China, based on the design of urban development and long-term planning of the landscaping project. In addition, we must also consider the traditional layout of the city area and the physical and geographical situation and so on, to enhance the objective and scientific nature of urban landscape. Therefore, it is of great practical significance to ensure the quality of landscaping in the effective management of municipal landscape engineering.
Final Technical Report - Modernization of the Boulder Canyon Hydroelectric Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Taddeucci, Joe
2013-03-29
The Boulder Canyon Hydroelectric Project (BCH) was purchased by the City of Boulder, CO (the city) in 2001. Project facilities were originally constructed in 1910 and upgraded in the 1930s and 1940s. By 2009, the two 10 MW turbine/generators had reached or were nearing the end of their useful lives. One generator had grounded out and was beyond repair, reducing plant capacity to 10 MW. The remaining 10 MW unit was expected to fail at any time. When the BCH power plant was originally constructed, a sizeable water supply was available for the sole purpose of hydroelectric power generation. Betweenmore » 1950 and 2001, that water supply had gradually been converted to municipal water supply by the city. By 2001, the water available for hydroelectric power generation at BCH could not support even one 10 MW unit. Boulder lacked the financial resources to modernize the facilities, and Boulder anticipated that when the single, operational historical unit failed, the project would cease operation. In 2009, the City of Boulder applied for and received a U.S. Department of Energy (DOE) grant for $1.18 million toward a total estimated project cost of $5.155 million to modernize BCH. The federal funding allowed Boulder to move forward with plant modifications that would ensure BCH would continue operation. Federal funding was made available through the American Recovery and Reinvestment Act (ARRA) of 2009. Boulder determined that a single 5 MW turbine/generator would be the most appropriate capacity, given the reduced water supply to the plant. Average annual BCH generation with the old 10 MW unit had been about 8,500 MW-hr, whereas annual generation with a new, efficient turbine could average 11,000 to 12,000 MW-hr. The incremental change in annual generation represents a 30% increase in generation over pre-project conditions. The old turbine/generator was a single nozzle Pelton turbine with a 5-to-1 flow turndown and a maximum turbine/generator efficiency of 82%. The new unit is a double nozzle Pelton turbine with a 10-to-1 flow turndown and a maximum turbine/generator efficiency of 88%. This alone represents a 6% increase in overall efficiency. The old turbine operated at low efficiencies due to age and non-optimal sizing of the turbine for the water flow available to the unit. It was shut down whenever water flow dropped to less than 4-5 cfs, and at that flow, efficiency was 55 to 60%. The new turbine will operate in the range of 70 to 88% efficiency through a large portion of the existing flow range and would only have to be shut down at flow rates less than 3.7 cfs. Efficiency is expected to increase by 15-30%, depending on flow. In addition to the installation of new equipment, other goals for the project included: Increasing safety at Boulder Canyon Hydro Increasing protection of the Boulder Creek environment Modernizing and integrating control equipment into Boulder's municipal water supply system, and Preserving significant historical engineering information prior to power plant modernization. From January 1, 2010 through December 31, 2012, combined consultant and contractor personnel hours paid for by both the city and the federal government have totaled approximately 40,000. This equates roughly to seven people working full time on the project from January 2010 through December 2012. This project also involved considerable material expense (steel pipe, a variety of valves, electrical equipment, and the various components of the turbine and generator), which were not accounted for in terms of hours spent on the project. However, the material expense related to this project did help to create or preserve manufacturing/industrial jobs throughout the United States. As required by ARRA, the various components of the hydroelectric project were manufactured or substantially transformed in the U.S. BCH is eligible for nomination to the National Register of Historic Places due in part to its unique engineering features and innovative construction techniques. Special efforts were directed toward documenting the (largely original) interior of the plant and installing new equipment without modifying the power plant exterior in order to preserve the historical significance of the facility. In addition, a significant portion of the historical equipment within the power plant was preserved in place. The modernization project began with DOE grant award on January 1, 2010, and the project was completed on December 31, 2012. In addition to city engineering and hydroelectric staff, major project participants included AECOM (design/engineering) Canyon Industries (turbine/generator manufacture), Gracon Corporation (general construction contractor), Exponential Engineering Company (electrical engineering) and URS Corporation (historical documentation), as well as numerous other subcontractors and consultants.« less
NWTC. He was the project lead for the design and construction of the NWTC 5.8 MW dynamometer facility completed in 2013. During 2012-2016, Jim was responsible for operations, safety, and engineering assessment of a successful net-power-producing experiment in Hawaii, a fully-functional and grid-connected OTEC
Making Chemistry Relevant to the Engineering Major
ERIC Educational Resources Information Center
Basu-Dutt, Sharmistha; Slappey, Charles; Bartley, Julie K.
2010-01-01
As part of a campus-wide, externally funded project to increase performance in, enthusiasm for, and retention within STEM disciplines, we developed an interdisciplinary, team-taught first-year seminar course. The construction and delivery of this course was designed to show the relevance of selected general chemistry topics such as matter and…
48 CFR 36.609-1 - Design within funding limitations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Design within funding... Services 36.609-1 Design within funding limitations. (a) The Government may require the architect-engineer contractor to design the project so that construction costs will not exceed a contractually specified dollar...
APPLIED GEOLOGIC, MICROBIOLOGICAL, AND ENGINEERING CONSTRAINTS OF IN-SITU BTEX BIOREMEDIATION
An in-situ bioremediation project has been designed and constructed for a site in south-central Kansas just north of Wichita. A pipeline leaked an unknown quantity of refinedfuels in the 1970s. The spill was undetected until hydrocarbons were found in a nearby municipal water sup...
Code of Federal Regulations, 2014 CFR
2014-07-01
... means any object or assemblage of objects, regardless of age, whether in situ or not, that may carry... structure made up of interdependent and interrelated parts in a definite pattern or organization. Constructed by humans, it is often an engineering project large in scale. An aircraft wreck or shipwreck is a...
Puget Sound Tidal Energy In-Water Testing and Development Project Final Technical Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Collar, Craig W
2012-11-16
Tidal energy represents potential for the generation of renewable, emission free, environmentally benign, and cost effective energy from tidal flows. A successful tidal energy demonstration project in Puget Sound, Washington may enable significant commercial development resulting in important benefits for the northwest region and the nation. This project promoted the United States Department of Energy's Wind and Hydropower Technologies Program's goals of advancing the commercial viability, cost-competitiveness, and market acceptance of marine hydrokinetic systems. The objective of the Puget Sound Tidal Energy Demonstration Project is to conduct in-water testing and evaluation of tidal energy technology as a first step towardmore » potential construction of a commercial-scale tidal energy power plant. The specific goal of the project phase covered by this award was to conduct all activities necessary to complete engineering design and obtain construction approvals for a pilot demonstration plant in the Admiralty Inlet region of the Puget Sound. Public Utility District No. 1 of Snohomish County (The District) accomplished the objectives of this award through four tasks: Detailed Admiralty Inlet Site Studies, Plant Design and Construction Planning, Environmental and Regulatory Activities, and Management and Reporting. Pre-Installation studies completed under this award provided invaluable data used for site selection, environmental evaluation and permitting, plant design, and construction planning. However, these data gathering efforts are not only important to the Admiralty Inlet pilot project. Lessons learned, in particular environmental data gathering methods, can be applied to future tidal energy projects in the United States and other parts of the world. The District collaborated extensively with project stakeholders to complete the tasks for this award. This included Federal, State, and local government agencies, tribal governments, environmental groups, and others. All required permit and license applications were completed and submitted under this award, including a Final License Application for a pilot hydrokinetic license from the Federal Energy Regulatory Commission. The tasks described above have brought the project through all necessary requirements to construct a tidal pilot project in Admiralty Inlet with the exception of final permit and license approvals, and the selection of a general contractor to perform project construction.« less
Towards a theoretical clarification of biomimetics using conceptual tools from engineering design.
Drack, M; Limpinsel, M; de Bruyn, G; Nebelsick, J H; Betz, O
2017-12-13
Many successful examples of biomimetic products are available, and most research efforts in this emerging field are directed towards the development of specific applications. The theoretical and conceptual underpinnings of the knowledge transfer between biologists, engineers and architects are, however, poorly investigated. The present article addresses this gap. We use a 'technomorphic' approach, i.e. the application of conceptual tools derived from engineering design, to better understand the processes operating during a typical biomimetic research project. This helps to elucidate the formal connections between functions, working principles and constructions (in a broad sense)-because the 'form-function-relationship' is a recurring issue in biology and engineering. The presented schema also serves as a conceptual framework that can be implemented for future biomimetic projects. The concepts of 'function' and 'working principle' are identified as the core elements in the biomimetic knowledge transfer towards applications. This schema not only facilitates the development of a common language in the emerging science of biomimetics, but also promotes the interdisciplinary dialogue among its subdisciplines.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Willenbrock, J.H.; Thomas, H.R. Jr.; Burati, J.L. Jr.
1978-06-01
The basic objective of this research effort was to perform a comparative analysis of the Quality Assurance practices related to the structural concrete phase on nine nuclear power plant projects which are (or have been) under construction in the United States in the past ten years. This analysis identified the response of each Quality Assurance program to the applicable criteria of 10 CFR Part 50, Appendix B as well as to the pertinent regulatory requirements and industry standards. The major emphasis was placed on the construction aspects of the structural concrete phase of each project. The engineering and design aspectsmore » were examined whenever they interfaced with the construction aspects. For those aspects of the Quality Assurance system which can be considered managerial in nature (i.e., organizational relationships, types of Quality Assurance programs, corrective action procedures, etc.) an attempt has been made to present the alternative approaches that were identified. For those aspects of the Quality Assurance system which are technical in nature (i.e., the frequency of testing for slump, compressive strength, etc.) an attempt has been made to present a comparative analysis between projects and in relation to the recommended or mandated practices presented in the appropriate industry codes and standards.« less
Bacterial computing with engineered populations.
Amos, Martyn; Axmann, Ilka Maria; Blüthgen, Nils; de la Cruz, Fernando; Jaramillo, Alfonso; Rodriguez-Paton, Alfonso; Simmel, Friedrich
2015-07-28
We describe strategies for the construction of bacterial computing platforms by describing a number of results from the recently completed bacterial computing with engineered populations project. In general, the implementation of such systems requires a framework containing various components such as intracellular circuits, single cell input/output and cell-cell interfacing, as well as extensive analysis. In this overview paper, we describe our approach to each of these, and suggest possible areas for future research. © 2015 The Author(s) Published by the Royal Society. All rights reserved.
Denver airport pumping systems achieve optimal [Delta] T's
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mannion, G.F.; Krist, G.D.
1994-07-01
This article describes how the pumping and generating systems at the new Denver Airport operate efficiently with the user loops in the buildings producing design temperature rise at all load levels. Fifteen miles east of Denver's Stapleton International Airport lies the newly completed Denver International Airport (DIA)--the world's largest and most high-tech airport. Besides being one of the largest construction projects in the works, it has many of the latest technical innovations available. Of particular interest to the HVAC industry is the design of the heating and cooling water systems. These systems provide environmental cooling and heating water to themore » three concourses, the airport office building, and the main terminal. The mechanical engineers for the project were all from the Denver area. The central plant design was the work of Behrent Engineering Co.; the three concourses were designed by Swanson-Rink Associates; and the main terminal and administrative office building were designed by Abeyta Engineering Consultants. The overall system concept was developed during the initial design phase by engineers from these firms, members of the DIA staff, and application engineers from several manufacturers.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mehrez, Loujaine; Ghanem, Roger; McAuliffe, Colin
multiscale framework to construct stochastic macroscopic constitutive material models is proposed. A spectral projection approach, specifically polynomial chaos expansion, has been used to construct explicit functional relationships between the homogenized properties and input parameters from finer scales. A homogenization engine embedded in Multiscale Designer, software for composite materials, has been used for the upscaling process. The framework is demonstrated using non-crimp fabric composite materials by constructing probabilistic models of the homogenized properties of a non-crimp fabric laminate in terms of the input parameters together with the homogenized properties from finer scales.
2013-03-01
of written questions and answers to the USACE upon completion of test production . E. POTENTIAL BENEFITS The use of a proficiency test by the USACE...the USACE, the sponsoring agency, to determine an end- product deliverable that would assist the agency with its mission needs. Because this project...as well as the production of and feedback from 11 the pilot PAT. In Chapter V, the researchers summarize the project and present the conclusion
2010-09-01
affecting this small ditch-wetland shall be addressed by bringing the original ditch elevation back to grade so that no permanent fill of the ditch...be impacted, as estimated by the US Corps of Engineers. The construction site has potential for heavy equipment and excavation efforts to affect wetl...USACE regarding the sanitary sewer force main project. The Corps made a preliminary determination that the project- affected wetlands are jurisdictional
Role to Be Played by Independent Geotechnical Supervision in the Foundation for Bridge Construction
NASA Astrophysics Data System (ADS)
Sobala, Dariusz; Rybak, Jarosław
2017-10-01
Some remarks concerning the necessity of employing an independent and over all ethical geotechnical survey were presented in the paper. Starting from the design phase, through the whole construction process, the importance of geotechnical engineer is stated in legal acts. Numerous testing technologies serve for the calibration of geotechnical technologies and allow for confirming the quality and capacity of piles. Special emphasis was payed to the involvement of scientifical and research institutions which can not only serve services but also can postprocess and methodize collected data. Such databases enable for new codes, methods and recommendations. Selection of deep foundations for bridge-type structures is most often dependent on complex geotechnical conditions, concentrated loads and constraints for pier displacements. Besides the last ones, prior to more common introduction of the design-construct system, could be a convenient justification for design engineer, who imposed deep foundation because he did not want or was not able to estimate the effect of pier settlement on civil engineering structure. The paper provides some notes about the need to engage a geotechnical supervising service of high competency and ethical quality during engineering and construction stages of foundations for bridge-type structures where legal requirements are of special consideration. Successive stages of projects are reviewed and research methods used for current calibration of geotechnical technologies and verification of geotechnical work quality are analysed. Special attention is given to potential involvement of independent R&D institutions which, apart from rendering specific services, also collect and systemize the research results thus enabling, in the long term, to revise engineering standards, instructions and guidelines.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Eggeman, Tim; O'Neill, Brian
2016-08-17
ZeaChem Inc. and US DOE successfully demonstrated the ZeaChem process for producing sugars and ethanol from high-impact biomass feedstocks. The project was executed over a 5-year period under a $31.25 million cooperative agreement (80:20 Federal:ZeaChem cost share). The project was managed by dividing it into three budget periods. Activities during Budget Period 1 were limited to planning, permitting, and other pre-construction planning. Budget Period 2 activities included engineering, procurement, construction, commissioning, start-up and initial operations through the Independent Engineer Test Runs. The scope of construction was limited to the Chem Frac and Hydrogenolysis units, as the Core Facility was alreadymore » in place. Construction was complete in December 2012, and the first cellulosic ethanol was produced in February 2013. Additional operational test runs were conducted during Budget Period 3 (completed June 2015) using hybrid poplar, corn stover, and wheat straw feedstocks, resulting in the production of cellulosic ethanol and various other biorefinery intermediates. The research adds to the understanding of the Chem Frac and Hydrogenolysis technologies in that the technical performance of each unit was measured, and the resulting data and operational experience can be used as the basis for engineering designs, thus mitigating risks for deployment in future commercial facilities. The Chem Frac unit was initially designed to be operated as two-stage dilute acid hydrolysis, with first stage conditions selected to remove the hemicellulose fraction of the feedstock, and the second stage conditions selected to remove the cellulose fraction. While the Chem Frac unit met or exceeded the design capacity of 10 ton(dry)/day, the technical effectiveness of the Chem Frac unit was below expectations in its initial two-stage dilute acid configuration. The sugars yields were low, the sugars were dilute, and the sugars had poor fermentability caused by excessive inhibitors from wood breakdown products, resulting in a non-viable process from an economic point of view. Later runs with the Chem Frac unit switched to a configuration that used dilute acid pretreatment followed by enzymatic hydrolysis. This change improved yield, increased sugar concentrations, and improved fermentability of sugars. The Hydrogenolysis unit met or exceeded all expectations with respect to unit capacity, technical performance, and economic performance. The US DOE funds for the project were provided through the American Recovery and Reinvestment Act of 2009. In addition to the scientific/technical merit of the project, this project benefited the public through the creation of approximately 75 onsite direct construction-related jobs, 25 direct on-going operations-related jobs, plus numerous indirect jobs, and thus was well aligned with the goals of the American Recovery and Reinvestment Act of 2009.« less
Teaching the Next Generation of Scientists and Engineers the NASA Design Process
NASA Technical Reports Server (NTRS)
Caruso, Pamela W.; Benfield, Michael P. J.; Justice, Stefanie H.
2011-01-01
The Integrated Product Team (IPT) program, led by The University of Alabama in Huntsville (UAH), is a multidisciplinary, multi-university, multi-level program whose goal is to provide opportunities for high school and undergraduate scientists and engineers to translate stakeholder needs and requirements into viable engineering design solutions via a distributed multidisciplinary team environment. The current program supports three projects. The core of the program is the two-semester senior design experience where science, engineering, and liberal arts undergraduate students from UAH, the College of Charleston, Southern University at Baton Rouge, and Ecole Suprieure des Techniques Aronautiques et de Construction Automobile (ESTACA) in Paris, France form multidisciplinary competitive teams to develop system concepts of interest to the local aerospace community. External review boards form to provide guidance and feedback throughout the semester and to ultimately choose a winner from the competing teams. The other two projects, the Innovative Student Project for the Increased Recruitment of Engineering and Science Students (InSPIRESS) Level I and Level II focus exclusively on high school students. InSPIRESS Level I allows high schools to develop a payload to be accommodated on the system being developed by senior design experience teams. InSPIRESS Level II provides local high school students first-hand experience in the senior design experience by allowing them to develop a subsystem or component of the UAH-led system over the two semesters. This program provides a model for NASA centers to engage the local community to become more involved in design projects.
Improving motivation and engagement in core engineering courses with student teams
NASA Astrophysics Data System (ADS)
Trenshaw, Kathryn Faye
Team-based projects are common in capstone engineering design courses and increasingly common in first-year engineering programs. Despite high enrollments and budget cutbacks affecting many programs, second- and third-year students can also benefit from team-based project experiences, which motivate them to succeed in engineering and prepare them for a globally competitive workforce. My dissertation research demonstrates that team design projects can be incorporated into the curricula of engineering departments, and these projects result in positive affective outcomes for students. Using ABET outcomes and Self Determination Theory (SDT) as the background for my studies, I investigated students' confidence, motivation, and sense of community after experiencing team design projects in two different engineering departments at a large public institution. In the first study, I used a sequential mixed methods approach with a primary quantitative phase followed by an explanatory qualitative phase to evaluate a chemical engineering program that integrated team design projects throughout the curriculum. The evaluation methods included a survey based on desired ABET outcomes for students and focus groups to expand on the quantitative results. Students reported increased confidence in their design, teamwork, and communication skills after completing the projects. In my second and third studies, I used qualitative interviews based on SDT to explore student motivation in an electrical and computer engineering course redesigned to support students' intrinsic motivation to learn. SDT states that intrinsic motivation to learn is supported by increasing students' sense of autonomy, competence, and relatedness in regard to their learning. Using both narrative inquiry and phenomenological methodologies, I analyzed data from interviews of students for mentions of autonomy, competence, and relatedness as well as course events that were critical in changing students' motivation. Analysis revealed that individual choice, constructive failures, and a strong sense of community in the classroom were critical to moving students toward intrinsic motivation. Further, community building through team experiences characterized the essence of the student experience in the course. My research highlights a need for better quantitative measures of students' affective outcomes, specifically motivation, in the context of a single course. Based on the results of my studies, SDT should be reevaluated in terms of possible interdependencies between autonomy, competence, and relatedness, and how the social context of large engineering courses may create a deeper need for supporting relatedness.
1980-02-01
for Permit for Construction and Repair of Dam" filed on March 16, 1959. f. Design and Construction History Design data on file with NJDEP include: 1...LAr- Us a-2. hr’s. LA9~ WATF=R? SiQ_~~- SL- !E q VOL ( YFv - mcA>-) (Acmr-- =T.) 2o4~ 2-Ito STORCH ENGINEERS shootL... of 11. Project FmnnK Wmr=X---A-1
2011-07-01
Aeronautical Research Center missile site (Site 5), JP-4 tank truck spill (Site 7) at the eastern end of Taxiway A, Building 202 Drum Storage Yard (Site...BNOISE2. BNOISE2 was developed by the . U.S. Army Construction Engineering Research Laboratory for the Operational Noise to assess large arms weapons...was estimated using the OneShot component of BNOISE2. Per AR 200-1, if there are multiple weapon types fired from one location, the single-event
DOE Office of Scientific and Technical Information (OSTI.GOV)
Keller, Carl J.
2004-07-13
BPA proposes to fund IDFG to plan and complete construction of fish passage improvements and water conservation activities that are contained within IDFG’s Statement of Work (SOW) for the period 7/1/04 to 6/30/05. The funding request contained in their SOW is part of an ongoing IDFG effort to fund anadromous fish passage projects that fall outside the scope of the Mitchell Act. The proposed SOW activities fall within the following four categories: Phase I-Planning and Design (gather data, perform investigations, and exchange information; perform surveys and assessments to be compliant; survey project sites and perform engineering designs; perform contract andmore » project management); Phase II-Construction and Implementation (procure materials and supplies, prepare contracts and solicit bids, plant native seedlings, complete capital improvements); Phase III-Operation and Maintenance (maintain office operations); and Phase IV- Monitoring and Evaluation (monitor and evaluate post-project effects, reporting). The SOW culminates with proposed construction of 18 capital improvement projects (Table 1 attached). The types of capital improvements include: screening gravity water diversions; consolidating and/or eliminating ditches; evaluating and screening pump diversions; evaluating and implementing water conservation activities; constructing screens along migration routes and rearing areas for hatchery and wild salmon; improving upstream and downstream passage for anadromous fish; and maximize benefits to aquatic habitat. Because each of the proposed projects in the SOW is still in the planning stages, the specifics of each still need to be completed.« less
Evaluation of Supply Chain Management Systems Used in Civil Engineering
NASA Astrophysics Data System (ADS)
Tomczak, Michał; Rzepecki, Łukasz
2017-10-01
One of the most important factors which have an effect on the cost and time of the building process is the organization of physical resources and the information flow structure. Depending on how effective this system is, a building project may end with a success or a failure. Because of many conditions of the construction executing and different needs of the contractors, there are different Supply Chain Management (SCM) systems connected with supplying construction projects: single-stage, multi-stage or combined. The article presents a comparative analysis of construction SCM systems based on a modified fuzzy AHP. The modification of this method is based on the use of interval type-2 fuzzy sets to aggregate evaluation according to the idea proposed by Mikhailov. The use of such a model of group preferences of decision-makers, makes it possible to take into consideration both the linguistic imprecision of an evaluation and the small number of experts. The weight values of specific criteria and the final scale vector of considered variants are obtained during the analysis. This may give a recommendation to general contractors in construction projects about which evaluation criteria and supply systems are preferred.
Hanford Spent Nuclear Fuel Project recommended path forward
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fulton, J.C.
The Spent Nuclear Fuel Project (the Project), in conjunction with the U.S. Department of Energy-commissioned Independent Technical Assessment (ITA) team, has developed engineered alternatives for expedited removal of spent nuclear fuel, including sludge, from the K Basins at Hanford. These alternatives, along with a foreign processing alternative offered by British Nuclear Fuels Limited (BNFL), were extensively reviewed and evaluated. Based on these evaluations, a Westinghouse Hanford Company (WHC) Recommended Path Forward for K Basins spent nuclear fuel has been developed and is presented in Volume I of this document. The recommendation constitutes an aggressive series of projects to construct andmore » operate systems and facilities to safely retrieve, package, transport, process, and store K Basins fuel and sludge. The overall processing and storage scheme is based on the ITA team`s proposed passivation and vault storage process. A dual purpose staging and vault storage facility provides an innovative feature which allows accelerated removal of fuel and sludge from the basins and minimizes programmatic risks beyond any of the originally proposed alternatives. The projects fit within a regulatory and National Environmental Policy Act (NEPA) overlay which mandates a two-phased approach to construction and operation of the needed facilities. The two-phase strategy packages and moves K Basins fuel and sludge to a newly constructed Staging and Storage Facility by the year 2000 where it is staged for processing. When an adjoining facility is constructed, the fuel is cycled through a stabilization process and returned to the Staging and Storage Facility for dry interim (40-year) storage. The estimated total expenditure for this Recommended Path Forward, including necessary new construction, operations, and deactivation of Project facilities through 2012, is approximately $1,150 million (unescalated).« less
An innovative fast-track development for Cote d`Ivoire
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kreider, G.J.; Barnes, J.E.; Smitherman, J.E.
1996-12-31
In May, 1994, approval was received for the development of the Panthere Gas Field and Lion Oil Field by UMC Petroleum Corporation as operator. At that time, UMC had drilled one well from a jackup at Panthere in 270 feet of water and had set a guyed caisson. Following the Panthere gas discovery, the Lion oil discovery well was drilled in 235 feet of water and another guyed caisson was set. Paragon Engineering Services had been hired in late 1993 to develop project scenarios and cost estimates and as the project evolved, detailed engineering, procurement and construction management services. Productionmore » equipment for 30,000 BOPD, 16,000 BWPD and 75 MMSCFD was to be installed on a jackup drilling rig converted to a Mobile Offshore Production Unit (MOPU) located at the Lion A caisson. Production from Panthere would flow through an 8-inch line to the MOPU. The production equipment on the MOPU would (1) separate oil, water and gas, (2) treat the oil for sale and the water for discharge, (3) pump the oil into an 8-inch pipeline to the refinery in Abidjan, (4) compress the oil well and gas well gas as needed, and (5) dehydrate it for sale. A CALM buoy with shuttle tanker was included in the original plan for early production and as a backup to the oil pipeline. It was also unknown at project initiation whether a gas sales contract would be successfully negotiated, and thus the project was to proceed on the basis of flaring produced gas with capability to add equipment at a later date for gas sales. This paper describes how the project was organized and how this organization allowed the project to accommodate changes and construction problems as they developed while completing the project on time.« less
NASA Astrophysics Data System (ADS)
Schneller, D.
2014-08-01
The E-ELT has completed its design phase and is now entering construction. ESO is acting as prime contractor and usually procures subsystems, including their design, from industry. This, in turn, leads to a large number of requirements, whose validity, consistency and conformity with user needs requires extensive management. Therefore E-ELT Systems Engineering has chosen to follow a systematic approach, based on a reasoned requirement architecture that follows the product breakdown structure of the observatory. The challenge ahead is the controlled flow-down of science user needs into engineering requirements, requirement specifications and system design documents. This paper shows how the E-ELT project manages this. The project has adopted IBM DOORTM as a supporting requirements management tool. This paper deals with emerging problems and pictures potential solutions. It shows trade-offs made to reach a proper balance between the effort put in this activity and potential overheads, and the benefit for the project.
NASA Astrophysics Data System (ADS)
Pascual, R.
2010-03-01
This article describes an extension to project-oriented learning to increase social construction of knowledge and learning. The focus is on: (a) maximising opportunities for students to share their knowledge with practitioners by joining communities of practice, and (b) increasing their intrinsic motivation by creating conditions for student's relatedness. The case study considers a last year capstone course in Mechanical Engineering. The work addresses innovative practices of active learning and beyond project-oriented learning through: (a) the development of a web-based decision support system, (b) meetings between the communities of students, maintenance engineers and academics, and (c) new off-campus group instances. The author hypothesises that this multi-modal approach increases deep learning and social impact of the educational process. Surveys to the actors support a successful achievement of the educational goals. The methodology can easily be extended to further improve the learning process.
Code of Federal Regulations, 2013 CFR
2013-04-01
... THE INTERIOR, AND INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE..., engineering reports, design reports, plans of requirements, cost estimates, environmental assessments, or environmental impact reports and archeological reports. (b) An Indian tribe or tribal organization is not...
Code of Federal Regulations, 2012 CFR
2012-04-01
... THE INTERIOR, AND INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE..., engineering reports, design reports, plans of requirements, cost estimates, environmental assessments, or environmental impact reports and archeological reports. (b) An Indian tribe or tribal organization is not...
Code of Federal Regulations, 2011 CFR
2011-04-01
... THE INTERIOR, AND INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE..., engineering reports, design reports, plans of requirements, cost estimates, environmental assessments, or environmental impact reports and archeological reports. (b) An Indian tribe or tribal organization is not...
Code of Federal Regulations, 2014 CFR
2014-04-01
... THE INTERIOR, AND INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE..., engineering reports, design reports, plans of requirements, cost estimates, environmental assessments, or environmental impact reports and archeological reports. (b) An Indian tribe or tribal organization is not...
Skills Conversion Project: Chapter 6, Forest Operations and Wood Products. Final Report.
ERIC Educational Resources Information Center
National Society of Professional Engineers, Washington, DC.
A study of the forest operations and wood products industries was conducted in Atlanta and Seattle by the National Society of Professional Engineers. Included among these industries are tree development, crop and land management, logging, material handling transportation, cutting, peeling, assembly, pulp and paper, mobile homes, construction,…
Students' Perceptions of BIM Education in the Higher Education Sector: A UK and US Perspective
ERIC Educational Resources Information Center
Shelbourn, M.; Macdonald, J.; McCuen, T.; Lee, S.
2017-01-01
The use of building information modelling (BIM) has increased in the global architecture, engineering, construction and owner-operated (AECO) industries. This increased use has contributed to a recognition by project stakeholders of its importance across the building life cycle, leading higher education institutions to rethink their AECO…
DOT National Transportation Integrated Search
2013-03-01
This project provides techniques to improve hot-mix asphalt (HMA) overlays specifically through the use of : special additives and innovative surfacing technologies with aggregates that are locally available in Illinois. The : ultimate goal is to imp...
ERIC Educational Resources Information Center
Claus, Richard N.; And Others
The 5-year School-to-Work (STW) Opportunities project of the School District of Saginaw, Michigan, was implemented through the Manufacturing, Engineering, Construction, and Automotive (MECA) partnership. Housed at the district's Saginaw Career Complex, it included collaboration among Career Complex staff and local business representatives in the…
Synthetic building materials for transport buildings and structures
NASA Astrophysics Data System (ADS)
Gerasimova, Vera
2017-10-01
The most effective building materials account for the highest growth not only in construction of residential and public buildings, but also other capital projects including roadways, bridges, drainage, communications and other engineering projects. Advancement in the technology of more efficient and ecologically responsible insulation materials have been a priority for safety, minimal maintenance and longevity of finished construction projects. The practical use of modern building materials such as insulation, sound reduction and low energy consumption are a benefit in cost and application compared to the use of outdated heavier and labor-intensive materials. The most efficient way for maximizing insolation and sound proofing should be done during the design stages of the project according to existing codes and regulations that are required by Western Government. All methods and materials that are used need to be optimized in order to reach a high durability and low operational and maintenance cost exceeding more than 50 years of the life of the building, whether it is for public, industrial or residential use. Western construction techniques and technologies need to be applied and adapted by the Russian Federation to insure the most productive successful methods are being implemented. The issues of efficient insulation materials are outlined in this article.
Estimating and bidding for the Space Station Processing Facility
NASA Technical Reports Server (NTRS)
Brown, Joseph A.
1993-01-01
This new, unique Cost Engineering Report introduces the 800-page, C-100 government estimate for the Space Station Processing Facility (SSPF) and Volume IV Aerospace Construction Price Book. At the January 23, 1991, bid opening for the SSPF, the government cost estimate was right on target. Metric, Inc., Prime Contractor, low bid was 1.2 percent below the government estimate. This project contains many different and complex systems. Volume IV is a summary of the cost associated with construction, activation and Ground Support Equipment (GSE) design, estimating, fabrication, installation, testing, termination, and verification of this project. Included are 13 reasons the government estimate was so accurate; abstract of bids, for 8 bidders and government estimate with additive alternates, special labor and materials, budget comparison and system summaries; and comments on the energy credit from local electrical utility. This report adds another project to our continuing study of 'How Does the Low Bidder Get Low and Make Money?' which was started in 1967, and first published in the 1973 AACE Transaction with 10 more ways the low bidder got low. The accuracy of this estimate proves the benefits of our Kennedy Space Center (KSC) teamwork efforts and KSC Cost Engineer Tools which are contributing toward our goals of the Space Station.
Using tailored methodical approaches to achieve optimal science outcomes
NASA Astrophysics Data System (ADS)
Wingate, Lory M.
2016-08-01
The science community is actively engaged in research, development, and construction of instrumentation projects that they anticipate will lead to new science discoveries. There appears to be very strong link between the quality of the activities used to complete these projects, and having a fully functioning science instrument that will facilitate these investigations.[2] The combination of using internationally recognized standards within the disciplines of project management (PM) and systems engineering (SE) has been demonstrated to lead to achievement of positive net effects and optimal project outcomes. Conversely, unstructured, poorly managed projects will lead to unpredictable, suboptimal project outcomes ultimately affecting the quality of the science that can be done with the new instruments. The proposed application of these two specific methodical approaches, implemented as a tailorable suite of processes, are presented in this paper. Project management (PM) is accepted worldwide as an effective methodology used to control project cost, schedule, and scope. Systems engineering (SE) is an accepted method that is used to ensure that the outcomes of a project match the intent of the stakeholders, or if they diverge, that the changes are understood, captured, and controlled. An appropriate application, or tailoring, of these disciplines can be the foundation upon which success in projects that support science can be optimized.
BUILDING MATERIALS RECLAMATION PROGRAM
DOE Office of Scientific and Technical Information (OSTI.GOV)
David C. Weggel; Shen-En Chen; Helene Hilger
2010-08-31
This report describes work conducted on the Building Materials Reclamation Program for the period of September 2008 to August 2010. The goals of the project included selecting materials from the local construction and demolition (C&D) waste stream and developing economically viable reprocessing, reuse or recycling schemes to divert them from landfill storage. Educational resources as well as conceptual designs and engineering feasibility demonstrations were provided for various aspects of the work. The project was divided into two distinct phases: Research and Engineering Feasibility and Dissemination. In the Research Phase, a literature review was initiated and data collection commenced, an advisorymore » panel was organized, and research was conducted to evaluate high volume C&D materials for nontraditional use; five materials were selected for more detailed investigations. In the Engineering Feasibility and Dissemination Phase, a conceptual study for a regional (Mecklenburg and surrounding counties) collection and sorting facility was performed, an engineering feasibility project to demonstrate the viability of recycling or reuse schemes was created, the literature review was extended and completed, and pedagogical materials were developed. Over the two-year duration of the project, all of the tasks and subtasks outlined in the original project proposal have been completed. The Final Progress Report, which briefly describes actual project accomplishments versus the tasks/subtasks of the original project proposal, is included in Appendix A of this report. This report describes the scientific/technical aspects (hypotheses, research/testing, and findings) of six subprojects that investigated five common C&D materials. Table 1 summarizes the six subprojects, including the C&D material studied and the graduate student and the faculty advisor on each subproject.« less
2011-07-01
A relatively small portion of this accreted land would be removed by the proposed project and returned to the River. U.S. Army Corps of Engineers... Planting a portion of the site currently utilized for row-crop agriculture to native hardwood tree species. • Gradual sloping of the new River...the change would be localized and so small that it would not be of any measurable or perceptible consequence. Minor: Impact could result in a
Air Force Civil Engineer, Volume 10, Number 1, Spring 2002
2002-01-01
gone into the 823rd Expeditionary RED HORSE Squadron�s military construction (MILCON) funded ramp project at Al Udeid Air Base, Qatar , and the main...AE W P ub lic A ff ai rs an Air Base RED HORSE builds MILCON project in Qatar SSgt Chuck Risinger, 823rd RHS, operates a slip form paver March 24...and were not designed to limit or contain the migration of lead into the environ- ment and sub-surface groundwater aquifers . An estimated 2,000
The role of discourse in group knowledge construction: A case study of engineering students
NASA Astrophysics Data System (ADS)
Kittleson, Julie M.; Southerland, Sherry A.
2004-03-01
This qualitative study examined the role of discourse (verbal elements of language) and Discourse (nonverbal elements related to the use of language, such as ways of thinking, valuing, and using tools and technologies) in the process of group knowledge construction of mechanical engineering students. Data included interviews, participant observations, and transcripts from lab sessions of a group of students working on their senior design project. These data were analyzed using discourse analysis focusing on instances of concept negotiation, interaction in which multiple people contribute to the evolving conceptual conversation. In this context, despite instructors' attempts to enhance the collaboration of group members, concept negotiation was rare. In an effort to understand this rarity, we identified themes related to an engineering Discourse, which included participants' assumptions about the purpose of group work, the views about effective groups, and their epistemologies and ontologies. We explore how the themes associated with the engineering Discourse played a role in how and when the group engaged in concept negotiation. We found that underlying ideologies and assumptions related to the engineering Discourse played both facilitating and inhibitory roles related to the group's conceptually based interactions.
Risk Assessment on Constructors during Over-water Riprap Based on Entropy Weight and FAHP
NASA Astrophysics Data System (ADS)
Wu, Tongqing; Li, Liang; Liang, Zelong; Mao, Tian; Shao, Weifeng
2017-07-01
Being aimed at waterway regulation engineering, there exist risks of over-water riprap for constructors which keeps uncertainty and complexity. For the purpose of evaluating the possibility and consequence, this paper utilizes fuzzy analytic hierarchy process with abbreviation of FAHP to do empowerment on the related risk indicators, constructs FAHP under entropy weight and establishes relevant evaluation factor set and evaluation language for constructors during over-water riprap construction process. Through doing risk probability estimation and risk consequence size evaluation on the factor of constructors, this paper introduces this model into risk analysis on constructors during over-water riprap of Ching River waterway regulation project. Results show that evaluation of this method is so credible that it could be utilized in practical engineering.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2015-05-01
This project represents the third phase of a multi-year effort to develop and bring to market a High Performance Manufactured Home (HPMH). In this project, the Northwest Energy Efficient Manufactured Housing Program worked with Building America Partnership for Improved Residential Construction and Bonneville Power Administration to help four factory homebuilders build prototype zero energy ready manufactured homes, resulting in what is expected to be a 30% savings relative to the Building America Benchmark. (The actual % savings varies depending on choice of heating equipment and climate zone). Previous phases of this project created a HPMH specification and prototyped individual measuresmore » from the package to obtain engineering approvals and develop preliminary factory construction processes. This case study describes the project team's work during 2014 to build prototype homes to the HPMH specifications and to monitor the homes for energy performance and durability. Monitoring is expected to continue into 2016.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Petersen, Eric; Mathieu, Olivier; Morones, Anibal
This Final Report documents the entire four years of the project, from October 1, 2013 through September 30, 2017. This project was concerned with the chemical kinetics of fuel blends with high-hydrogen content in the presence of impurities. Emphasis was also on the design and construction of a new, high-pressure turbulent flame speed facility and the use of ignition delay times and flame speeds to elucidate the diluent and impurity effects on the fuel chemistry at gas turbine engine conditions and to also validate the chemical kinetics models. The project was divided into five primary tasks: 1) Project Management andmore » Program Planning; 2) Turbulent Flame Speed Measurements at Atmospheric Pressure; 3) Experiments and Kinetics of Syngas Blends with Impurities; 4) Design and Construction of a High-Pressure Turbulent Flame Speed Facility; and 5) High-Pressure Turbulent Flame Speed Measurements. Details on the execution and results of each of these tasks are provided in the main report.« less
FutureGen 2.0 Oxy-combustion Large Scale Test – Final Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kenison, LaVesta; Flanigan, Thomas; Hagerty, Gregg
The primary objectives of the FutureGen 2.0 CO 2 Oxy-Combustion Large Scale Test Project were to site, permit, design, construct, and commission, an oxy-combustion boiler, gas quality control system, air separation unit, and CO 2 compression and purification unit, together with the necessary supporting and interconnection utilities. The project was to demonstrate at commercial scale (168MWe gross) the capability to cleanly produce electricity through coal combustion at a retrofitted, existing coal-fired power plant; thereby, resulting in near-zeroemissions of all commonly regulated air emissions, as well as 90% CO 2 capture in steady-state operations. The project was to be fully integratedmore » in terms of project management, capacity, capabilities, technical scope, cost, and schedule with the companion FutureGen 2.0 CO 2 Pipeline and Storage Project, a separate but complementary project whose objective was to safely transport, permanently store and monitor the CO 2 captured by the Oxy-combustion Power Plant Project. The FutureGen 2.0 Oxy-Combustion Large Scale Test Project successfully achieved all technical objectives inclusive of front-end-engineering and design, and advanced design required to accurately estimate and contract for the construction, commissioning, and start-up of a commercial-scale "ready to build" power plant using oxy-combustion technology, including full integration with the companion CO 2 Pipeline and Storage project. Ultimately the project did not proceed to construction due to insufficient time to complete necessary EPC contract negotiations and commercial financing prior to expiration of federal co-funding, which triggered a DOE decision to closeout its participation in the project. Through the work that was completed, valuable technical, commercial, and programmatic lessons were learned. This project has significantly advanced the development of near-zero emission technology and will be helpful to plotting the course of, and successfully executing future large demonstration projects. This Final Scientific and Technical Report describes the technology and engineering basis of the project, inclusive of process systems, performance, effluents and emissions, and controls. Further, the project cost estimate, schedule, and permitting requirements are presented, along with a project risk and opportunity assessment. Lessons-learned related to these elements are summarized in this report. Companion reports Oxy-combustion further document the accomplishments and learnings of the project, including: A.01 Project Management Report which describes what was done to coordinate the various participants, and to track their performance with regard to schedule and budget B.02 Lessons Learned - Technology Integration, Value Improvements, and Program Management, which describes the innovations and conclusions that we arrived upon during the development of the project, and makes recommendations for improvement of future projects of a similar nature . B.03 Project Economics, which details the capital and operation costs and their basis, and also illustrates the cost of power produced by the plant with certain sensitivities. B.04 Power Plant, Pipeline, and Injection Site Interfaces, which details the interfaces between the two FutureGen projects B.05 Contractual Mechanisms for Design, Construction, and Operation, which describes the major EPC, and Operations Contracts required to execute the project.« less
INNOVATIVE FOSSIL FUEL FIRED VITRIFICATION TECHNOLOGY FOR SOIL REMEDIATION
DOE Office of Scientific and Technical Information (OSTI.GOV)
J. Hnat; L.M. Bartone; M. Pineda
2001-07-13
This Summary Report summarizes the progress of Phases 3, 3A and 4 of a waste technology Demonstration Project sponsored under a DOE Environmental Management Research and Development Program and administered by the U.S. Department of Energy National Energy Technology Laboratory-Morgantown (DOE-NETL) for an ''Innovative Fossil Fuel Fired Vitrification Technology for Soil Remediation''. The Summary Reports for Phases 1 and 2 of the Program were previously submitted to DOE. The total scope of Phase 3 was to have included the design, construction and demonstration of Vortec's integrated waste pretreatment and vitrification process for the treatment of low level waste (LLW), TSCA/LLWmore » and mixed low-level waste (MLLW). Due to funding limitations and delays in the project resulting from a law suit filed by an environmental activist and the extended time for DOE to complete an Environmental Assessment for the project, the scope of the project was reduced to completing the design, construction and testing of the front end of the process which consists of the Material Handling and Waste Conditioning (MH/C) Subsystem of the vitrification plant. Activities completed under Phases 3A and 4 addressed completion of the engineering, design and documentation of the Material Handling and Conditioning System such that final procurement of the remaining process assemblies can be completed and construction of a Limited Demonstration Project be initiated in the event DOE elects to proceed with the construction and demonstration testing of the MH/C Subsystem.« less
NASA Astrophysics Data System (ADS)
Kravchenko, Iulia; Luhmann, Thomas; Shults, Roman
2016-06-01
For the preparation of modern specialists in the acquisition and processing of three-dimensional data, a broad and detailed study of related modern methods and technologies is necessary. One of the most progressive and effective methods of acquisition and analyzing spatial data is terrestrial laser scanning. The study of methods and technologies for terrestrial laser scanning is of great importance not only for GIS specialists, but also for surveying engineers who make decisions in traditional engineering tasks (monitoring, executive surveys, etc.). The understanding and formation of the right approach in preparing new professionals need to develop a modern and variable educational program. This educational program must provide effective practical and laboratory work and the student's coursework. The resulting knowledge of the study should form the basis for practical or research of young engineers. In 2014, the Institute of Applied Sciences (Jade University Oldenburg, Germany) and Kyiv National University of Construction and Architecture (Kiev, Ukraine) had launched a joint educational project for the introduction of terrestrial laser scanning technology for collection and processing of spatial data. As a result of this project practical recommendations have been developed for the organization of educational processes in the use of terrestrial laser scanning. An advanced project-oriented educational program was developed which is presented in this paper. In order to demonstrate the effectiveness of the program a 3D model of the big and complex main campus of Kyiv National University of Construction and Architecture has been generated.
NASA Astrophysics Data System (ADS)
Schwarz, Ludwig; Eder, Stefan; Mattle, Bruno; Hammer, Helmut
Rising competitive pressure in the construction business, ever tighter schedules being set up by the clients and ongoing disputes between engineering geologists and civil engineers about the role of geotechnical engineers have - in the last few years - led to increasing discussions between engineers and geologists about the allocation of competences during the design process of underground structures. In the course of this debate, which is often polemic and anything but objective, important information is quite frequently lost - a development which may not only be to the disadvantage of the client but which may also do damage to the reputation of the professions involved. The design procedure of the new Austrian guideline for the geomechanical design of underground structures requires a close collaboration of geologists, geotechnical and civil engineers, yet without allocating competences. While preparing the tender documents for the first construction lot of the Northern feeder line of the Brenner base tunnel, the necessity of a close cooperation of the involved professions became apparent due to the complex geological situation encountered in the project area and the enormous amount of data available. Despite these difficult boundary conditions, the successful application of the guideline was last but not least the result of the joint efforts of the multidisciplinary design team.
Törner, Marianne; Pousette, Anders
2009-01-01
The often applied engineering approach to safety management in the construction industry needs to be supplemented by organizational measures and measures based on how people conceive and react to their social environment. This requires in-depth knowledge of the broad preconditions for high safety standards in construction. The aim of the study was to comprehensively describe the preconditions and components of high safety standards in the construction industry from the perspective of both experienced construction workers and first-line managers. Five worker safety representatives and 19 first-line managers were interviewed, all strategically selected from within a large Swedish construction project. Phenomenographic methodology was used for data acquisition and analysis and to categorize the information. Nine informants verified the results. The study identified four main categories of work safety preconditions and components: (1) Project characteristics and nature of the work, which set the limits of safety management; (2) Organization and structures, with the subcategories planning, work roles, procedures, and resources; (3) Collective values, norms, and behaviors, with the subcategories climate and culture, and interaction and cooperation; and (4) Individual competence and attitudes, with the subcategories knowledge, ability and experience, and individual attitudes. The results comprehensively describe high safety standards in construction, incorporating organizational, group, individual, and technical aspects. High-quality interaction between different organizational functions and hierarchical levels stood out as important aspects of safety. The results are discussed in relation to previous research into safety and into the social-psychological preconditions for other desired outcomes in occupational settings. The results can guide construction companies in planning and executing construction projects to a high safety standard.
Cost containment and KSC Shuttle facilities or cost containment and aerospace construction
NASA Technical Reports Server (NTRS)
Brown, J. A.
1985-01-01
This presentation has the objective to show examples of Cost Containment of Aerospace Construction at Kennedy Space Center (KSC), taking into account four major levels of Project Development of the Space Shuttle Facilities. The levels are related to conceptual criteria and site selection, the design of construction and ground support equipment, the construction of facilities and ground support equipment (GSE), and operation and maintenance. Examples of cost containment are discussed. The continued reduction of processing time from landing to launching represents a demonstration of the success of the cost containment methods. Attention is given to the factors which led to the selection of KSC, the use of Cost Engineering, the employment of the Construction Management Concept, and the use of Computer Aided Design/Drafting.
2011-10-04
CAPE CANAVERAL, Fla. -- Members of the crawlerway system evaluation team pose for a group portrait in front of the Headquarters Building at NASA's Kennedy Space Center in Florida. The team received the Florida Project of the Year award from the American Society of Civil Engineers (ASCE). The Cape Canaveral branch of the ASCE nominated the team for its project, the Crawlerway Evaluation to Support a Heavy-Lift Program. The crawlerway is a 130-foot-wide, specialty-built roadway between Kennedy's Vehicle Assembly Building (VAB), where rockets and spacecraft are prepared for flight, and Launch Pad 39A and 39B. The team's more than two-year evaluation confirmed the crawlerway system would be able to support the weight of moving the agency's future heavy-lift rockets and potential commercial vehicles from the VAB to the launch pads. The award honors the team's outstanding engineering efforts in research, design, construction and management, recognizing the complexity of multi-agency coordination and cost-effective engineering advances. For more information on the American Society of Civil Engineers, visit: http://www.asce.org. Photo credit: NASA/Kim Shiflett
NASA Astrophysics Data System (ADS)
Suwal, Sunil; Singh, Vishal
2018-07-01
Building Information Modelling (BIM) tools and processes are increasingly adopted and implemented in the construction industry. Consequently, BIM education is considered increasingly important in Architecture, Engineering and Construction (AEC) education. While most of the research and literature on BIM education in engineering studies has focused on BIM implementation strategies, processes, benefits, and challenges, there is limited study on students' perception towards the implementation of BIM courses, or about online BIM learning platforms, or about the BIM tools themselves. Therefore, this paper takes the first steps towards addressing this gap. This study analyses students' (57 students) perception and sentiments towards the use of an online BIM learning platform and explores the potential implications of the findings for BIM education. The findings suggest that online BIM learning platforms are highly rated by students as a positive learning experience, indicating the need for greater integration of such tools and approaches in AEC courses.
2011-10-04
CAPE CANAVERAL, Fla. -- NASA managers at NASA's Kennedy Space Center in Florida show off the Florida Project of the Year trophies that the crawlerway system evaluation team received from the American Society of Civil Engineers (ASCE). From left are Michael Benik, director of Center Operations; Pepper Phillips, manager of the 21st Century Ground Systems Program Office; and Russell Romanella, associate director for Engineering and Technical Operations. The Cape Canaveral branch of the ASCE nominated the team for its project, the Crawlerway Evaluation to Support a Heavy-Lift Program. The crawlerway is a 130-foot-wide, specialty-built roadway between Kennedy's Vehicle Assembly Building (VAB), where rockets and spacecraft are prepared for flight, and Launch Pad 39A and 39B. The team's more than two-year evaluation confirmed the crawlerway system would be able to support the weight of moving the agency's future heavy-lift rockets and potential commercial vehicles from the VAB to the launch pads. The award honors the team's outstanding engineering efforts in research, design, construction and management, recognizing the complexity of multi-agency coordination and cost-effective engineering advances. For more information on the American Society of Civil Engineers, visit: http://www.asce.org. Photo credit: NASA/Kim Shiflett
Evans, Lyn
2018-05-23
Abstract: From the civil engineering, to the manufacturing of the various magnet types, each building block of this extraordinary machine required ambitious leaps in innovation. This lecture will review the history of the LHC project, focusing on the many challenges -- scientific, technological, managerial -- that had to be met during the various phases of R&D, industrialization, construction, installation and commissioning.
Code of Federal Regulations, 2013 CFR
2013-10-01
... TRANSPORTATION-EFFECTUATION OF TITLE VI OF THE CIVIL RIGHTS ACT OF 1964 Pt. 21, App. C Appendix C to Part 21... Nondiscrimination on Federally Assisted Projects (a) Examples. The following examples, without being exhaustive... retained for, or incidental to, construction, planning, research, highway safety, engineering, property...
Code of Federal Regulations, 2014 CFR
2014-10-01
... TRANSPORTATION-EFFECTUATION OF TITLE VI OF THE CIVIL RIGHTS ACT OF 1964 Pt. 21, App. C Appendix C to Part 21... Nondiscrimination on Federally Assisted Projects (a) Examples. The following examples, without being exhaustive... to, construction, planning, research, highway safety, engineering, property management, and fee...
Code of Federal Regulations, 2011 CFR
2011-10-01
... TRANSPORTATION-EFFECTUATION OF TITLE VI OF THE CIVIL RIGHTS ACT OF 1964 Pt. 21, App. C Appendix C to Part 21... Nondiscrimination on Federally Assisted Projects (a) Examples. The following examples, without being exhaustive... retained for, or incidental to, construction, planning, research, highway safety, engineering, property...
Code of Federal Regulations, 2010 CFR
2010-10-01
... TRANSPORTATION-EFFECTUATION OF TITLE VI OF THE CIVIL RIGHTS ACT OF 1964 Pt. 21, App. C Appendix C to Part 21... Nondiscrimination on Federally Assisted Projects (a) Examples. The following examples, without being exhaustive... retained for, or incidental to, construction, planning, research, highway safety, engineering, property...
Code of Federal Regulations, 2012 CFR
2012-10-01
... TRANSPORTATION-EFFECTUATION OF TITLE VI OF THE CIVIL RIGHTS ACT OF 1964 Pt. 21, App. C Appendix C to Part 21... Nondiscrimination on Federally Assisted Projects (a) Examples. The following examples, without being exhaustive... retained for, or incidental to, construction, planning, research, highway safety, engineering, property...
Designing a Site to Embed and to Interact with Wolfram Alpha Widgets in Math and Sciences Courses
ERIC Educational Resources Information Center
Cepeda, Francisco Javier Delgado; Acosta, Ruben Dario Santiago
2014-01-01
This paper reports design and implementation outcomes at middle development advance of an educative program based on use and construction of widgets on Wolfram Alpha platform at higher education level for engineering and sciences areas. Widgets were based on Physics and Mathematics curricula under Project Oriented Learning and Blended Learning…
Rightsizing HVAC Systems to Reduce Capital Costs and Save Energy
ERIC Educational Resources Information Center
Sebesta, James
2010-01-01
Nearly every institution is faced with the situation of having to reduce the cost of a construction project from time to time through a process generally referred to as "value engineering." Just the mention of those words, however, gives rise to all types of connotations, thoughts, and memories (usually negative) for those in the…
Code of Federal Regulations, 2011 CFR
2011-07-01
...-Cities landfill, Salt River Pima-Maricopa Indian Community. 49.22 Section 49.22 Protection of Environment... MANAGEMENT Tribal Authority § 49.22 Federal implementation plan for Tri-Cities landfill, Salt River Pima... construction of electricity-generating engines owned and operated by the Salt River Project at the Tri-Cities...
Smart timber bridge on geosynthetic reinforced soil (GRS) abutments
Adam Senalik; James P. Wacker; Travis K. Hosteng; John Hermanson
2017-01-01
Recently, Buchanan County, Iowa, has cooperated with the U.S. Federal Highway Administration (FHWA), USDA Forest Service, Forest Products Laboratory (FPL), and Iowa State Universityâs Bridge Engineering Center (ISUâBEC) to initiate a project involving the construction and monitoring of a glued-laminated (glulam) timber superstructure on geosynthetic reinforced soil (...
Technical Basis of Scaling Relationships for the Pretreatment Engineering Platform
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kuhn, William L.; Arm, Stuart T.; Huckaby, James L.
Pacific Northwest National Laboratory has been tasked by Bechtel National Inc. (BNI) on the River Protection Project-Waste Treatment Plant (RPP-WTP) project to perform research and development activities. The Pretreatment Engineering Platform (PEP) is being designed and constructed as part of a plan to respond to an issue raised by the WTP External Flowsheet Review Team (EFRT) entitled “Undemonstrated Leaching Processes” and numbered M12. The PEP replicates the WTP leaching process using prototypic equipment and control strategies. The approach for scaling PEP performance data to predict WTP performance is critical to the successful resolution of the EFRT issue. This report describesmore » the recommended PEP scaling approach, PEP data interpretation and provides recommendations on test conduct and data requirements.« less
Bench-Scale Filtration Testing in Support of the Pretreatment Engineering Platform (PEP)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Billing, Justin M.; Daniel, Richard C.; Kurath, Dean E.
Pacific Northwest National Laboratory (PNNL) has been tasked by Bechtel National Inc. (BNI) on the River Protection Project-Hanford Tank Waste Treatment and Immobilization Plant (RPP-WTP) project to perform research and development activities to resolve technical issues identified for the Pretreatment Facility (PTF). The Pretreatment Engineering Platform (PEP) was designed, constructed and operated as part of a plan to respond to issue M12, “Undemonstrated Leaching Processes.” The PEP is a 1/4.5-scale test platform designed to simulate the WTP pretreatment caustic leaching, oxidative leaching, ultrafiltration solids concentration, and slurry washing processes. The PEP testing program specifies that bench-scale testing is to bemore » performed in support of specific operations, including filtration, caustic leaching, and oxidative leaching.« less
Error begat error: design error analysis and prevention in social infrastructure projects.
Love, Peter E D; Lopez, Robert; Edwards, David J; Goh, Yang M
2012-09-01
Design errors contribute significantly to cost and schedule growth in social infrastructure projects and to engineering failures, which can result in accidents and loss of life. Despite considerable research that has addressed their error causation in construction projects they still remain prevalent. This paper identifies the underlying conditions that contribute to design errors in social infrastructure projects (e.g. hospitals, education, law and order type buildings). A systemic model of error causation is propagated and subsequently used to develop a learning framework for design error prevention. The research suggests that a multitude of strategies should be adopted in congruence to prevent design errors from occurring and so ensure that safety and project performance are ameliorated. Copyright © 2011. Published by Elsevier Ltd.
NASA Astrophysics Data System (ADS)
Huang, Qi-Zhang; Zhu, Yan-Qing; Shi, Ji-Fu; Wang, Lei-Lei; Zhong, Liu-Wen; Xu, Gang
2017-03-01
Not Available Project supported by the National Natural Science Foundation of China (Grant Nos. 21103194, 51506205, and 21673243), the Science and Technology Planning Project of Guangdong Province, China (Grant Nos. 2014A010106018 and 2013A011401011), the Guangdong-Hong Kong Joint Innovation Project of Guangdong Province, China (Grant No. 2014B050505015), the Special Support Program of Guangdong Province, China (Grant No. 2014TQ01N610), the Director Innovation Foundation of Guangzhou Institute of Energy Conversion, China (Grant No. y307p81001), and the Solar Photothermal Advanced Materials Engineering Research Center Construction Project of Guangdong Province, China (Grant No. 2014B090904071).
DOE Office of Scientific and Technical Information (OSTI.GOV)
Baba, Nina; Friedmann, Karyn; Groulx, Charles
2013-07-01
The Port Hope Initiative (PHAI) involves the cleanup of historic low-level radioactive waste in various locations throughout the communities of Port Hope and Clarington, Ontario, as well as the construction of two engineered aboveground mounds for safe long-term management. The PHAI is comprised of two major projects - the Port Hope Project and the Port Granby Project. An Environmental Assessment (EA) was undertaken for each project and as a result EA Follow-up Programs were developed and are being implemented addressing both biophysical and socioeconomic aspects. This paper provides insight on elements of the EA Follow-up Program development, and its implementation.more » (authors)« less
Arch-Axis Coefficient Optimization of Long-Span Deck-Type Concrete-Filled Steel Tubular Arch Bridge
NASA Astrophysics Data System (ADS)
Liu, Q. J.; Wan, S.; Liu, H. C.
2017-11-01
This paper is based on Nanpuxi super major bridge which is under construction and starts from Wencheng Zhejiang province to Taishun highway. A finite element model of the whole bridge is constructed using Midas Civil finite element software. The most adverse load combination in the specification is taken into consideration to determine the method of calculating the arch-axis coefficient of long-span deck-type concrete-filled steel tubular arch bridge. By doing this, this paper aims at providing references for similar engineering projects.
Lu, Tong; Tai, Chiew-Lan; Yang, Huafei; Cai, Shijie
2009-08-01
We present a novel knowledge-based system to automatically convert real-life engineering drawings to content-oriented high-level descriptions. The proposed method essentially turns the complex interpretation process into two parts: knowledge representation and knowledge-based interpretation. We propose a new hierarchical descriptor-based knowledge representation method to organize the various types of engineering objects and their complex high-level relations. The descriptors are defined using an Extended Backus Naur Form (EBNF), facilitating modification and maintenance. When interpreting a set of related engineering drawings, the knowledge-based interpretation system first constructs an EBNF-tree from the knowledge representation file, then searches for potential engineering objects guided by a depth-first order of the nodes in the EBNF-tree. Experimental results and comparisons with other interpretation systems demonstrate that our knowledge-based system is accurate and robust for high-level interpretation of complex real-life engineering projects.
Conceptual design study of improved automotives gas turbine powertrain
NASA Technical Reports Server (NTRS)
1979-01-01
Twenty-two candidate engine concepts and nineteen transmission concepts. Screening of these concepts, predominantly for fuel economy, cost and technical risk, resulted in a recommended powertrain consisting of a single-shaft engine, with a ceramic radial turbine rotor, connected through a differential split-power transmission utilizing a variable stator torque converter and a four speed automatic gearbox. Vehicle fuel economy and performance projections, preliminary design analyses and installation studies in a were completed. A cost comparison with the conventional spark ignited gasoline engine showed that the turbine engine would be more expensive initially, however, lifetime cost of ownership is in favor of the gas turbine. A powertrain research and development plan was constructed to gain information on timing and costs to achieve the required level of technology and demonstrate the engine in a vehicle by the year 1983.
FutureGen 2.0 Pipeline and Regional Carbon Capture Storage Project - Final Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Burger, Chris; Wortman, David; Brown, Chris
The U.S. Department of Energy’s (DOE) FutureGen 2.0 Program involves two projects: (1) the Oxy-Combustion Power Plant Project and (2) the CO2 Pipeline and Storage Project. This Final Technical Report is focused on the CO2 Pipeline and Storage Project. The FutureGen 2.0 CO2 Pipeline and Storage Project evolved from an initial siting and project definition effort in Phase I, into the Phase II activity consisting permitting, design development, the acquisition of land rights, facility design, and licensing and regulatory approvals. Phase II also progressed into construction packaging, construction procurement, and targeted early preparatory activities in the field. The CO2 Pipelinemore » and Storage Project accomplishments were significant, and in some cases unprecedented. The engineering, permitting, legal, stakeholder, and commercial learnings substantially advance the nation’s understanding of commercial-scale CO2 storage in deep saline aquifers. Voluminous and significant information was obtained from the drilling and the testing program of the subsurface, and sophisticated modeling was performed that held up to a wide range of scrutiny. All designs progressed to the point of securing construction contracts or comfort letters attesting to successful negotiation of all contract terms and willing execution at the appropriate time all major project elements – pipeline, surface facilities, and subsurface – as well as operations. While the physical installation of the planned facilities did not proceed in part due to insufficient time to complete the project prior to the expiration of federal funding, the project met significant objectives prior to DOE’s closeout decision. Had additional time been available, there were no known, insurmountable obstacles that would have precluded successful construction and operation of the project. Due to the suspension of the project, site restoration activities were developed and the work was accomplished. The site restoration efforts are also documented in this report. All permit applications had been submitted to all agencies for those permits or approvals required prior to the start of project construction. Most of the requisite permits were received during Phase II. This report includes information on each permitting effort. Successes and lessons learned are included in this report that will add value to the next generation of carbon storage efforts.« less
NASA Astrophysics Data System (ADS)
Borisovich Zelentsov, Leonid; Dmitrievna Mailyan, Liya; Sultanovich Shogenov, Murat
2017-10-01
The article deals with the problems of using the energy-efficient materials and engineering technologies during the construction of buildings and structures. As the analysis showed, one of the most important problems in this sphere is the infringement of production technologies working with energy-efficient materials. To improve the given situation, it is offered to set a technological normal at the design stage by means of working out the technological maps studying the set and the succession of operations in details, taking in mind the properties of energy-efficient materials. At Don State Technical University (DSTU) the intelligent systems of management are being developed providing organizational and technological and also informational integration of design and production stages by means of creating the single database of technological maps, volumes of work and resources.
Lunar surface vehicle model competition
NASA Technical Reports Server (NTRS)
1990-01-01
During Fall and Winter quarters, Georgia Tech's School of Mechanical Engineering students designed machines and devices related to Lunar Base construction tasks. These include joint projects with Textile Engineering students. Topics studied included lunar environment simulator via drop tower technology, lunar rated fasteners, lunar habitat shelter, design of a lunar surface trenching machine, lunar support system, lunar worksite illumination (daytime), lunar regolith bagging system, sunlight diffusing tent for lunar worksite, service apparatus for lunar launch vehicles, lunar communication/power cables and teleoperated deployment machine, lunar regolith bag collection and emplacement device, soil stabilization mat for lunar launch/landing site, lunar rated fastening systems for robotic implementation, lunar surface cable/conduit and automated deployment system, lunar regolith bagging system, and lunar rated fasteners and fastening systems. A special topics team of five Spring quarter students designed and constructed a remotely controlled crane implement for the SKITTER model.
Improving collaborative learning in online software engineering education
NASA Astrophysics Data System (ADS)
Neill, Colin J.; DeFranco, Joanna F.; Sangwan, Raghvinder S.
2017-11-01
Team projects are commonplace in software engineering education. They address a key educational objective, provide students critical experience relevant to their future careers, allow instructors to set problems of greater scale and complexity than could be tackled individually, and are a vehicle for socially constructed learning. While all student teams experience challenges, those in fully online programmes must also deal with remote working, asynchronous coordination, and computer-mediated communications all of which contribute to greater social distance between team members. We have developed a facilitation framework to aid team collaboration and have demonstrated its efficacy, in prior research, with respect to team performance and outcomes. Those studies indicated, however, that despite experiencing improved project outcomes, students working in effective software engineering teams did not experience significantly improved individual achievement. To address this deficiency we implemented theoretically grounded refinements to the collaboration model based upon peer-tutoring research. Our results indicate a modest, but statistically significant (p = .08), improvement in individual achievement using this refined model.
Solar power satellites: The Engineering Challenges
NASA Technical Reports Server (NTRS)
Woodcock, G. R.
1978-01-01
Certain elements of solar power satellite design and system engineering studies are reviewed analyzing solar power satellites as a potential baseload electric power source. The complete system concept concept includes not only the satellites and their ground stations, but also the space transportation for delivery of the satellites, piece by piece, into space, and the factories for their construction in space. Issues related to carrying the solar power satellite concept from the present design study phase through implementation of actual hardware are considered. The first issue category is environmental aspects of the SPS systems. The second category of issues is the technology risks associated with achieving the necessary component and subsystem performances. The third category includes the engineering issues associated with carrying out such a large scale project. The fourth issue category is financial: the funding required to bring such a project into being and the costs of the satellites and resulting cost of the power produced as compared to potential alternative energy sources.
Image Acquisition in Real Time
NASA Technical Reports Server (NTRS)
2003-01-01
In 1995, Carlos Jorquera left NASA s Jet Propulsion Laboratory (JPL) to focus on erasing the growing void between high-performance cameras and the requisite software to capture and process the resulting digital images. Since his departure from NASA, Jorquera s efforts have not only satisfied the private industry's cravings for faster, more flexible, and more favorable software applications, but have blossomed into a successful entrepreneurship that is making its mark with improvements in fields such as medicine, weather forecasting, and X-ray inspection. Formerly a JPL engineer who constructed imaging systems for spacecraft and ground-based astronomy projects, Jorquera is the founder and president of the three-person firm, Boulder Imaging Inc., based in Louisville, Colorado. Joining Jorquera to round out the Boulder Imaging staff are Chief Operations Engineer Susan Downey, who also gained experience at JPL working on space-bound projects including Galileo and the Hubble Space Telescope, and Vice President of Engineering and Machine Vision Specialist Jie Zhu Kulbida, who has extensive industrial and research and development experience within the private sector.
NASA Astrophysics Data System (ADS)
Dutta, Debalina
This project examines the intersectionalities of international females in engineering graduate programs of the United States, using frameworks of sustainability and liminality theory. According to Dutta and Kisselburgh (2011) international females in graduate engineering constitute the minorities of minorities, not only in terms of their status as international students but also by their underrepresentation as women in engineering (Faulkner, 2009). Research regarding international female graduate students tends to be categorized as the experiences of international students in the U.S. (Lee & Rice, 2007), or as the struggles of female engineers in engineering disciplines (Tonso, 2007). Therefore, this project aims to distinguish the unique population of female engineers of international origin from holistic studies of international students, and attempts to draw out and understand the experiences of international female students in U.S. engineering graduate programs. Dutta and Kisselburgh (2011) found that female engineers who are international in origin exist in liminal states indefinitely. This liminal nature has been described under the theory of liminality (Turner, 1967) which posits that when transitioning from one life-changing event to another (such as birth, death, marriage), individuals go through a transformatory phase where they are subjected to invisibility, vulnerability, and a feeling of loss. Although Turner posited this phase as transcendental and temporary, Dutta and Kisselburgh (2011) suggest the liminal period can be more permanent in contemporary global societies. In other words, liminal experiences of vulnerability and structural invisibility may be sustained experiences of international female engineering students. Furthermore, the project attends to the overlaps, tensions and challenging experiences faced by international females in surviving engineering graduate program. To achieve this goal, liminality theory is limited in accounting for how vulnerable individuals reframe their agentic outcomes to make meaning of their marginalized existence. Therefore, I integrate constructs of sustainability with liminality theory in order to provide a framework to understand the ability of vulnerable individuals (in this case, international female engineers) to persist within marginalizing social structures. Sustainability has been a useful framework to understand how organizations practice self-efficacy (Butler, 2001) and has the potential to understand the negotiations and discursive practices enacted by international women engineers by examining their everyday meaning-making practices. For international female engineers who are in between spaces of belonging, it becomes important to understand how they navigate these contested spaces and how they transform the spaces to their advantage by persisting in their struggles with the spaces. Through interviews and focus groups, I explored the ways in which international female engineering graduate students negotiate the tensions they experience through interviews and focus groups, attending to the underlying processes of sustenance through which international female engineering students negotiate their liminal status. In doing so, I introduce and discuss five themes of the practice of sustainability in negotiating liminality: (a) crystallizing engineering identities, (b) (re)constructing inclusion, (c) enduring hardships, (d) rearchitecting (in)visibility, and (e) (re)engineering efficacy. The contributions of this research lie in the amalgamation of liminality and sustainability theories to understand the discourses through which international women engineering graduate students negotiate the transitions they experience in U.S. engineering programs.
Two Architects and One Engineer: The Reconciliation of Disciplines
NASA Astrophysics Data System (ADS)
Belén Gómez Gómez, María
2017-10-01
At the end of the 17th century, when the Académie royale d’architecture was created in France, architecture was studied for the first time from a theoretical and analytical point of view. 100 years later, the École royale des ponts et chaussées was found, also in France. This division of responsibilities within the building discipline varies from country to country and within the specific historical period but, the idea of two professional branches related to architecture, remains to the present day. Through the centuries, this division has been perceived as a problem or as an advantage depending on the specific event, project or construction. However, at the end of the 19th century, when reinforced concrete came into the world of construction, both branches started an interesting collaboration that produced not just marvelous buildings but also helped to evolve architecture. This collaboration started in France and then spread to Spain, Italy and the rest of Europe. As an example of the work that these professionals carried out together was the team formed in the late fifties of the last century by two architects, Bruno Morassutti and Angelo Mangiarotti and an engineer, Aldo Favini. They worked together in Italy projecting amazing and very significant works, such as the Church of Mater Misericordiae which was constructed in Milan between the years 1956 and 1958. One of the main conclusions is that an adequate approach in the collaborative work of architects and engineers, results in impressive and amazing works in which the combination of aesthetic qualities and structural efficiency result in a harmonious building with plenty of significance.
Systems Engineering Model for ART Energy Conversion
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mendez Cruz, Carmen Margarita; Rochau, Gary E.; Wilson, Mollye C.
The near-term objective of the EC team is to establish an operating, commercially scalable Recompression Closed Brayton Cycle (RCBC) to be constructed for the NE - STEP demonstration system (demo) with the lowest risk possible. A systems engineering approach is recommended to ensure adequate requirements gathering, documentation, and mode ling that supports technology development relevant to advanced reactors while supporting crosscut interests in potential applications. A holistic systems engineering model was designed for the ART Energy Conversion program by leveraging Concurrent Engineering, Balance Model, Simplified V Model, and Project Management principles. The resulting model supports the identification and validation ofmore » lifecycle Brayton systems requirements, and allows designers to detail system-specific components relevant to the current stage in the lifecycle, while maintaining a holistic view of all system elements.« less
U.S. Coastal Flood Damage Reduction Projects: Federal Authorization and Investment Trends
NASA Astrophysics Data System (ADS)
Carter, N. T.
2015-12-01
The 2015 U.S. Environmental Protection Agency report Climate Change in the United States: Benefits of Global Action estimated the potential cumulative future economic impacts of storm surge and sea-level rise on U.S. coasts during this century at 5 trillion (2014 dollars) if no adaptation measures are implemented. These impacts drop to 0.8 trillion if investments are made in cost-effective adaptations and protections. Awareness of flood risk and its long-term fiscal impact historically has proven insufficient to motivate pre-disaster land use changes and investments in mitigation and protection. While many adaptations and protections fall largely under state and local authority, some stakeholders are interested in federal coastal flood protection projects, including projects by the U.S. Army Corps of Engineers. Since the 1950s, Congress has authorized the Corps to construct specific coastal projects. The broad vision, strategy, and priorities for the federal role in coastal flood damage reduction projects nonetheless remain ill-defined. This research analyzes (1) the authorization and appropriations trends for Corps coastal storm damage reduction projects, and (2) how Corps feasibility studies account for and address coastal flood hazards. Identified trends include: emergency appropriations for storm-damaged areas outstrip annual investments in coastal flood projects; the rate at which projects are congressionally approved for construction outpaces the rate at which construction is funded; and how coastal protection projects are evaluated in Corps feasibility studies shows variation and change in agency practices. These trends have consequences; they affect public and local expectations when projects begin providing protection benefits, and may influence investments in other adaptation measures. These trends also raise questions for policymakers at all levels and for scientists and practitioners interested in coastal flood resilience.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schneider, Abraham; Schneider, Gia; McKinstry, Katherine
Natel Energy is a low-head, distributed hydropower company based out of Alameda, CA. Natel manufactures and sells proprietary hydroelectric turbines called hydroEngines® that are suitable for low-head, high-flow settings, and range from 30kW to 1 MW of capacity per unit. Natel’s hydroEngine is a state-ofthe-art two stage impulse turbine, using blades mounted symmetrically on two belts perpendicular to the axis of travel, and using linearly-moving foils, rather than a rotor, to enable efficient conversion of kinetic energy of large volumes of water at low head with no risk of cavitation. In addition, the hydroEngine can be installed at or abovemore » tailwater level, reducing the excavation necessary to build the powerhouse and thus reducing total installed cost and project footprint. Thus, the hydroEngine technology enables a new generation of small hydro installations with low cost of project development, fish-friendly operations, and small project footprint. In September of 2015, Natel Energy formally commissioned its first project installation in Madras, Oregon, installing 1 SLH100 turbine at an existing drop structure on the North Unit Irrigation District (NUID) Main Canal. The water falls between 13.5 feet to 16.5 feet at this structure, depending on flow. The plant has an installed capacity of 250 kW and an expected annual generation of approximately 873 MWh. The plant operates at an annual capacity factor of 40%, and a capacity factor over the irrigation season, or period of available flow, of 80%. Annual capacity factor is calculated as a percentage of plant operating hours relative to a total of 8,760 hours in a year; because the irrigation canal in which the Project is located only runs water from April to October, the available flow capacity factor is higher. Net greenhouse gas reductions from the Monroe Project are estimated to be 602 tCO2/year. The purpose of this report is to provide an overview of the specifications for Natel’s first commissioned project, the project development process, the plant’s performance, project costs, and the construction, installation, and commissioning process. We hope that this report will provide useful context for assessment of the hydroEngine as a viable technology choice for future distributed, low-head hydropower projects, as well as assessment of the bankability, performance, reliability, and cost of the hydroEngine.« less
NASA Astrophysics Data System (ADS)
Mok, Esmond; Xia, Linyuan; Retscher, Guenther; Tian, Hui
2010-06-01
The application of integrated satellite and modern wireless positioning technologies for ubiquitous real-time resources management in large scale civil engineering projects can greatly optimize the time and cost in the construction process, and is now the trend for modern construction project management. As the outdoor conditions of most civil construction sites are open to sky, satellite positioning with the popularly used Global Positioning System (GPS) has been proved to be very efficient and effective. However, the condition in indoor and underground construction site is very complicated due to the fact that different construction activities would be carried out in different congested areas, involving heavy construction plant, equipment, professionals and technical personnel. Nowadays different emerging technologies such as Wi-Fi and ZigBee can be adopted for position and tracking in indoor environments. Nevertheless, under the very complicated construction site conditions these technologies may fail due to movement of human resources and construction plant, variation of metrological conditions, and serious multipath effects of signals. It is considered that Ultra Wide Band (UWB) technology is more suitable for indoor construction site environments. In this paper, a case study on the attempt of integrating GPS with Ubisense Real-time Location System (RTLS) for resources management in an underground railway construction site is discussed. Laboratory and field tests have shown that the RTLS can provide better resources management capability in terms of positioning accuracy and stability than Wi-Fi and ZigBee technologies under complicated construction environments. The test results show that the system can normally achieve better than 15 cm accuracy, and better than 1 m under adverse geometrical site condition. However, the high instrumental set up cost and the requirement for high quality data transmission cable for high precision time synchronization between sensors may deter wide application of similar system for resources management in construction sites.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kadagathur, G.
1990-12-10
Tenaga Nasional BHD (TEN) formerly known as National Electricity Board of Malaysia is proposing to construct a Combined Cycle Power Plant at Pasir Gudang. The project is known as Sultan Iskandar Power Station Phase 2 (SIPS-2). U.S. engineering companies and U.S. equipment manufacturers are having difficulty in procuring contracts from the Malaysian Power Industry. To date, the industry is dominated by consortia with British and Swiss participation. Several U.S. engineering companies have approached the US Trade and Development Program (TDP) to assist them in breaking into the Malaysian utility market by supporting their effort on their current proposals for SIPS-2more » project. It is recommended that TDP should approve a grant to TEN that would provide funds for engineering upto the preparation of equipment specifications and associated technology transfer. The grant along with the weak dollar should be attractive enough for TEN to strongly consider consortia with U.S. companies very favorably. The project also offers a potential for the export of U.S. manufactured equipment in the range of $170 million.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
This Final Supplement to the Final Environmental Impact Statement (Final Supplement) evaluates the economic, engineering, and environmental aspects of newly developed alternatives to an abandonment/conversion project proposed by Florida Gas Transmission Company (Florida Gas). It also updates the staff's previous FEIS and studies revisions to the original proposal. Wherever possible, the staff has adopted portions of its previous FEIS in lieu of reprinting portions of that analysis which require no change. 60 references, 8 figures, 35 tables.
Department of the Air Force. FY 1995 Budget Estimates. Military Construction and Family Housing
1994-02-01
monorail lift systems and provide AFFF fire protection system, and elevators. Renovate engineering and work areas; provide new air make-up unit and...135,0U0 SY 1,200 880-212 AFFF FIRE SUPPRESSION SYSTEM LS 800 FOR FUEL CELL TOTAL: 10,450 9b. Future Projects: Typical Planned Next Three Years: 111...PROTECT 2 EA 3,600 PH II & AFFF PUMPS/RESERVOIR TOTAL: 27,900 9b. Future Projects: Typical Planned Next Three Years: 442-758 WAREHOUSE 107,000 SF
1983-10-01
Rock, from required excavation, was utilized in the embankment. Amonium nitrate and 60 percent dynamite were used. No blasting records were kept...AD A135 578 MULTPLE-PURPOSE PROJECT OSAGE RIVER BASIN HUNDRED AND 1;TEN MILE CREEK KAA U) CORPS OF ENGINEERS KANSASOASS DS C C ES C IT UNCLASIFE D ...ADDRESS 12. REPORT DATE Estimates & Specifications Section (MRKED-DE), 1977 Revised October 1983 Design Branch (MRKED- D ), Kansas City District, 13
System engineering of the Atacama Large Millimeter/submillimeter Array
NASA Astrophysics Data System (ADS)
Bhatia, Ravinder; Marti, Javier; Sugimoto, Masahiro; Sramek, Richard; Miccolis, Maurizio; Morita, Koh-Ichiro; Arancibia, Demián.; Araya, Andrea; Asayama, Shin'ichiro; Barkats, Denis; Brito, Rodrigo; Brundage, William; Grammer, Wes; Haupt, Christoph; Kurlandczyk, Herve; Mizuno, Norikazu; Napier, Peter; Pizarro, Eduardo; Saini, Kamaljeet; Stahlman, Gretchen; Verzichelli, Gianluca; Whyborn, Nick; Yagoubov, Pavel
2012-09-01
The Atacama Large Millimeter/submillimeter Array (ALMA) will be composed of 66 high precision antennae located at 5000 meters altitude in northern Chile. This paper will present the methodology, tools and processes adopted to system engineer a project of high technical complexity, by system engineering teams that are remotely located and from different cultures, and in accordance with a demanding schedule and within tight financial constraints. The technical and organizational complexity of ALMA requires a disciplined approach to the definition, implementation and verification of the ALMA requirements. During the development phase, System Engineering chairs all technical reviews and facilitates the resolution of technical conflicts. We have developed analysis tools to analyze the system performance, incorporating key parameters that contribute to the ultimate performance, and are modeled using best estimates and/or measured values obtained during test campaigns. Strict tracking and control of the technical budgets ensures that the different parts of the system can operate together as a whole within ALMA boundary conditions. System Engineering is responsible for acceptances of the thousands of hardware items delivered to Chile, and also supports the software acceptance process. In addition, System Engineering leads the troubleshooting efforts during testing phases of the construction project. Finally, the team is conducting System level verification and diagnostics activities to assess the overall performance of the observatory. This paper will also share lessons learned from these system engineering and verification approaches.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Del Bravo, R.; Pinacci, P.; Trifilo, R.
1998-07-01
This paper has the aim to give a general overview of the api Energia IGCC project starting from the project background in 1992 and ending with the progress of construction. api Energia S.p.A., a joint VENTURE between api anonima petroli italiana S.p.A., Roma, Italy (51%), ABB Sae Sadelmi S.p.A., Milano, Italy (25%) and Texaco Development Corporation (24%), is building a 280 MW Integrated Gasification Combined Cycle plant in the api refinery at Falconara Marittima, on Italy' s Adriatic coast, using heavy oil residues. The plant is based on the modern concept of employing a highly efficient combined cycle power plantmore » fed with a low heating value fuel gas produced by gasifying heavy refinery residues. This scheme provides consistent advantages in terms of efficiency and environmental impact over alternative applications of the refinery residues. The electric power produced will feed the national grid. The project has been financed using the ``project financing'' scheme: over 1,000 billion Lira, representing 75% of the overall capital requirement, have been provided by a pool of international banks. In November 1996 the project reached financial closure and immediately after the detailed design and procurement activities started. Engineering, Procurement and Construction activities, carried out by a Consortium of companies of the ABB group, are totally in line with the schedule. Commercial operation of the plant, is scheduled for November 1999.« less
Black Creek Hydro Project high-line cable penstock installation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fonnesbeck, K.C.; Ellicock, R.
1995-12-31
The Black Creek Hydro Project is a remote, high head, run-of-river, small hydro project located near Seattle, Washington. The comparatively small size of this project was not indicative of the difficulties and challenges presented to the design engineers and construction contractors involved in it`s completion. The most difficult of these challenges was the design and installation of a buried penstock on very steep and heavily forested terrain. This paper will concentrate on construction of the Black Creek penstock, and specifically, that portion of the penstock which required innovative application of a suspended {open_quotes}high-line{close_quotes} cable operation as used is commonly formore » logging of steep slopes. For this project, the cable installation and yarder equipment were utilized for a variety of purposes including, clearing and logging of the slope, to secure heavy equipment and machinery required to excavate the penstock trench, transport and placement of the individual pipe joints and finally to encase the pipe with lean concrete. The successful application of this approach contributed greatly to the timely completion of the project. This paper will offer background information on the selection and design of the cable Installation as well as highlights of the solutions that were developed to overcome the design and construction problems encountered. Finally, cost data will be offered to those who may be faced with similar undertakings caused by the steep and difficult sites attracting more attention in present days.« less
ERIC Educational Resources Information Center
Mitchell, Eugene E., Ed.
In context of an instrumentation course, four ocean engineering students set out to design and construct a micro-computer based data acquisition system that would be compatible with the University's CYBER host computer. The project included hardware design in the area of sampling, analog-to-digital conversion and timing coordination. It also…
ERIC Educational Resources Information Center
Love, Paula
2012-01-01
The federal government last formally assessed the state of the nation's schools in the 1999 report "Condition of America's Public School," which estimated that it would take $127 billion to bring the nation's schools to "good condition." The American Society of Civil Engineers (ASCE) issued its own report card the same year. In…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wilhelm, B.
1996-12-31
Information is presented on a 110 MWe atmospheric CFB located in the Czech Republic firing brown coal. The following topics are discussed: fuel analysis; boiler design parameters; CFB fluidizing nozzle; and project time schedule. Information is also given on a 200 MWe atmospheric CFB located in the Republic of Korea firing Korean anthracite. Data are presented on fuel specifications; predicted performance; and engineering and construction schedule.
Coolidge solar powered irrigation pumping project
NASA Technical Reports Server (NTRS)
Larson, D. L.
1980-01-01
A 150 kW solar thermal electric power plant which includes over 2100 square meters of parabolic trough type collectors and an organic Rankine cycle turbine engine was constructed on an irrigated farm. The plant is interconnected with the electrical utility grid. Operation is providing an evaluation of equipment performance and operating and maintenance requirements as well as the desirability of an on farm location.
Study on the Accident-causing of Foundation Pit Engineering
NASA Astrophysics Data System (ADS)
Shuicheng, Tian; Xinyue, Zhang; Pengfei, Yang; Longgang, Chen
2018-05-01
With the development of high-rise buildings and underground space, a large number of foundation pit projects have occurred. Frequent accidents of it cause great losses to the society, how to reduce the frequency of pit accidents has become one of the most urgent problems to be solved. Therefore, analysing the influencing factors of foundation pit engineering accidents and studying the causes of foundation pit accidents, which of great significance for improving the safety management level of foundation pit engineering and reducing the incidence of foundation pit accidents. Firstly, based on literature review and questionnaires, this paper selected construction management, survey, design, construction, supervision and monitoring as research factors, we used the AHP method and the Dematel method to analyze the weights of various influencing factors to screen indicators to determine the ultimate system of accidents caused by foundation pit accidents; Secondly, SPSS 21.0 software was used to test the reliability and validity of the recovered questionnaire data. AMOS 7.0 software was used to fit, evaluate, and explain the set model; Finally, this paper analysed the influencing factors of foundation pit engineering accidents, corresponding management countermeasures and suggestions were put forward.
Duke Engineering explores huge African Power Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Newman, P.
1994-10-14
Duke Engineering & Services and the African Republic of Uganda have entered into a memorandum of understanding to explore the feasibility of installing one or more hydropower plants along the Nile River and building a 2,000 mile transmission line through southern Africa. The project`s participants say they envision a southern African electricity grid connecting all countries in the region. A team comprised of officials from DE&S, Edlow and SAD-ELEC will conduct a six-month, two-part study on the feasibility of linking the existing grid system in the region. The first part of the study will look at the feasibility of installingmore » one or more independent hydropower plants along the Nile and other rivers in Uganda. The second part will explore the design, construction and operation of a transmission system to interconnect Uganda, through neighboring countries to the south and east, to the Republic of South Africa. The site for the proposed hydroelectric plant will determine the route of the transmission line.« less
Managing a big ground-based astronomy project: the Thirty Meter Telescope (TMT) project
NASA Astrophysics Data System (ADS)
Sanders, Gary H.
2008-07-01
TMT is a big science project and its scale is greater than previous ground-based optical/infrared telescope projects. This paper will describe the ideal "linear" project and how the TMT project departs from that ideal. The paper will describe the needed adaptations to successfully manage real world complexities. The progression from science requirements to a reference design, the development of a product-oriented Work Breakdown Structure (WBS) and an organization that parallels the WBS, the implementation of system engineering, requirements definition and the progression through Conceptual Design to Preliminary Design will be summarized. The development of a detailed cost estimate structured by the WBS, and the methodology of risk analysis to estimate contingency fund requirements will be summarized. Designing the project schedule defines the construction plan and, together with the cost model, provides the basis for executing the project guided by an earned value performance measurement system.
Developing Engineering and Science Process Skills Using Design Software in an Elementary Education
NASA Astrophysics Data System (ADS)
Fusco, Christopher
This paper examines the development of process skills through an engineering design approach to instruction in an elementary lesson that combines Science, Technology, Engineering, and Math (STEM). The study took place with 25 fifth graders in a public, suburban school district. Students worked in groups of five to design and construct model bridges based on research involving bridge building design software. The assessment was framed around individual student success as well as overall group processing skills. These skills were assessed through an engineering design packet rubric (student work), student surveys of learning gains, observation field notes, and pre- and post-assessment data. The results indicate that students can successfully utilize design software to inform constructions of model bridges, develop science process skills through problem based learning, and understand academic concepts through a design project. The final result of this study shows that design engineering is effective for developing cooperative learning skills. The study suggests that an engineering program offered as an elective or as part of the mandatory curriculum could be beneficial for developing students' critical thinking, inter- and intra-personal skills, along with an increased their understanding and awareness for scientific phenomena. In conclusion, combining a design approach to instruction with STEM can increase efficiency in these areas, generate meaningful learning, and influence student attitudes throughout their education.
Building NYX [Engineering Materials
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1988-01-01
From April, 1951, to August 1954, New York Shipbuilding corporation carried out a subcontract with E.I. du Pont de Nemours company that was without parallel in the shipyard's history. The work, designated the NYX Project'' for reasons of security, which was vital to the operations of the Savannah River Plant, Aiken, S.C., which was then being designed and constructed by du Pont for the Atomic Energy Commission. It consisted of three broad parts: Development and experimental work; fabrication and testing of a prototype unit; and fabrication of production units. Five production units were ultimately built, one of them converted frommore » the prototype. All were fabricated from stainless steel, and involved welding techniques, control of thermal distortion and tolerances never previously attempted on assemblies of comparable size. This report provides engineering drawings for this project.« less
Building NYX [Engineering Materials
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1988-12-31
From April, 1951, to August 1954, New York Shipbuilding corporation carried out a subcontract with E.I. du Pont de Nemours & company that was without parallel in the shipyard`s history. The work, designated the ``NYX Project`` for reasons of security, which was vital to the operations of the Savannah River Plant, Aiken, S.C., which was then being designed and constructed by du Pont for the Atomic Energy Commission. It consisted of three broad parts: Development and experimental work; fabrication and testing of a prototype unit; and fabrication of production units. Five production units were ultimately built, one of them convertedmore » from the prototype. All were fabricated from stainless steel, and involved welding techniques, control of thermal distortion and tolerances never previously attempted on assemblies of comparable size. This report provides engineering drawings for this project.« less
NASA Astrophysics Data System (ADS)
Diawati, Chansyanah; Liliasari, Setiabudi, Agus; Buchari
2017-05-01
This project-based learning combined the chemistry of separation process using steam distillation with engineering design process in an undergraduate chemistry course. Students built upon their knowledge of phase changes, immiscible mixture, and the relationship between vapor pressure and boiling point to complete a project of modifications steam distillation apparatus. The research method is a qualitative case study, which aims to describe how (1) the creative thinking skills of students emerged during six weeks of theproject, (2) students built steam distillation apparatus characteristics as the project product and (3) students response to the project-based learning model. The results showed that the students had successfully constructed a steam distillation apparatus using plastic kettle as steam generator and distillation flask. A Plastic tubewas used to drain water vapor from steam generator to distillation flask and to drain steam containing essential oil to the condenser. A biscuit tin filled with ice was used as a condenser. The time required until resulting distillate was fifteen minutes. The production of essential was conductive qualitatively by a very strong smell typical of essential oil and two phases of distillate. Throughout the project, students formulated the relevant and varied problem, formulated the goals, proposed the ideas of the apparatus and materials, draw apparatus design, constructed apparatus, tested apparatus, evaluated, and reported the project. Student response was generally positive. They were pleased, interested, more understanding the concepts and work apparatus principles, also implemented new ideas. These results indicate that project-based learning can develop students' creative thinking skills. Based on these results, it is necessary to conduct research and implemented project-based learning to other concepts.
Hydrologic impacts of engineering projects on the Tigris Euphrates system and its marshlands
NASA Astrophysics Data System (ADS)
Jones, C.; Sultan, M.; Yan, E.; Milewski, A.; Hussein, M.; Al-Dousari, A.; Al-Kaisy, S.; Becker, R.
2008-05-01
SummaryRising demands for fresh water supplies are leading to water management practices that are altering natural flow systems world-wide. One of the most devastated of these natural systems is the Tigris-Euphrates watershed that over the past three decades has witnessed the construction of over 60 engineering projects that eliminated seasonal flooding, reduced natural flow and dramatically reduced the areal extent (1966: 8000 km 2; 2002: 750 km 2) of the Mesopotamian Marshes downstream. We constructed a catchment-based continuous (1964-1998) rainfall runoff model for the watershed (area: 10 6 km 2) using the Soil Water Assessment Tool (SWAT) model to understand the dynamics of the natural flow system, and to investigate the impacts of reduced overall flow and the related land cover and landuse change downstream in the marshes. The model was calibrated (1964-1970) and validated (1971-1998) against stream flow gauge data. Using the calibrated model we calculated the temporal variations in the average monthly flow rate (AMFR), the average monthly peak flow rate (AMPFR), and annual flow volume (AFV) of the Tigris and Euphrates into the marshes at a location near Al-Basrah city (31°N, 47.5°E) throughout the modeled period. Model results indicate that the AMPFR (6301 m 3/s) and average annual flow volume (AAFV: 80 × 10 9 m 3/yr) for period A (10/1/1965-09/30/1973), preceding the construction of the major dams is progressively diminished in periods B1 (10/1/1973-09/30/1989; AMPFR: 3073 m 3/s; AAFV: 55 × 10 9 m 3/yr) and B2 (10/1/1989-09/30/1998; AMPFR, 2319 m 3/s; AAFV: 50 × 10 9 m 3/yr) that witnessed the construction of the major dams (B1: Keban, Tabqa, Hamrin, Haditha, Mosul, Karakaya; B2: Ataturk) due to the combined effects of filling artificial lakes, evaporation and infiltration of impounded water and its utilization for irrigation purposes. To investigate the impacts of reduced flow on the areal extent of the marshes, we examined the variation in marsh size extracted from temporal satellite data (1966, 1975, 1976, 1977, 1984, 1985, 1986, 1987) acquired around the same approximate time period (July to September) of the year versus simulated AFV for the period preceding the onset (1987) of major local engineering projects (e.g., Crown of Battles River, Loyalty to the Leader Canal, Mother of Battles River) in and around the investigated marshes. Results indicate that the areal extent of the Central and Al-Hammar marshes (e.g., 1966: 7970 km 2, 1977: 6680 km 2, 1984: 5270 km 2) decreases with a decrease in AFV (e.g., 1966: 60.8 × 10 9 m 3, 1977: 56.9 × 10 9 m 3, 1984: 37.6 × 10 9 m 3). Using a relationship that describes the impact of reduced AFV on the areal extent of the marshes, we evaluated the impact of additional reductions in flow that will result from the implementation of the planned engineering projects on the Tigris-Euphrates system over the next few years. Upon completion of the ongoing South Eastern Anatolia project, with projected reductions in AFV exceeding 5 × 10 9 m 3/yr, the sustainable marshes in the Central and Al-Hammar area will be reduced by at least an additional 550 km 2.
NASA Space Engineering Research Center for utilization of local planetary resources
NASA Technical Reports Server (NTRS)
Ramohalli, Kumar; Lewis, John S.
1990-01-01
The University of Arizona and NASA have joined to form the UA/NASA Space Engineering Research Center. The purpose of the Center is to discover, characterize, extract, process, and fabricate useful products from the extraterrestrial resources available in the inner solar system (the moon, Mars, and nearby asteroids). Individual progress reports covering the center's research projects are presented and emphasis is placed on the following topics: propellant production, oxygen production, ilmenite, lunar resources, asteroid resources, Mars resources, space-based materials processing, extraterrestrial construction materials processing, resource discovery and characterization, mission planning, and resource utilization.
Assessing problem-solving skills in construction education with the virtual construction simulator
NASA Astrophysics Data System (ADS)
Castronovo, Fadi
The ability to solve complex problems is an essential skill that a construction and project manager must possess when entering the architectural, engineering, and construction industry. Such ability requires a mixture of problem-solving skills, ranging from lower to higher order thinking skills, composed of cognitive and metacognitive processes. These skills include the ability to develop and evaluate construction plans and manage the execution of such plans. However, in a typical construction program, introducing students to such complex problems can be a challenge, and most commonly the learner is presented with only part of a complex problem. To support this challenge, the traditional methodology of delivering design, engineering, and construction instruction has been going through a technological revolution, due to the rise of computer-based technology. For example, in construction classrooms, and other disciplines, simulations and educational games are being utilized to support the development of problem-solving skills. Previous engineering education research has illustrated the high potential that simulations and educational games have in engaging in lower and higher order thinking skills. Such research illustrated their capacity to support the development of problem-solving skills. This research presents evidence supporting the theory that educational simulation games can help with the learning and retention of transferable problem-solving skills, which are necessary to solve complex construction problems. The educational simulation game employed in this study is the Virtual Construction Simulator (VCS). The VCS is a game developed to provide students in an engaging learning activity that simulates the planning and managing phases of a construction project. Assessment of the third iteration of the VCS(3) game has shown pedagogical value in promoting students' motivation and a basic understanding of construction concepts. To further evaluate the benefits on problem-solving skills, a new version of the VCS(4) was developed, with new building modules and assessment framework. The design and development of the VCS4 leveraged research in educational psychology, multimedia learning, human-computer interaction, and Building Information Modeling. In this dissertation the researcher aimed to evaluate the pedagogical value of the VCS4 in fostering problem-solving skills. To answer the research questions, a crossover repeated measures quasi-experiment was designed to assess the educational gains that the VCS can provide to construction education. A group of 34 students, attending a fourth-year construction course at a university in the United States was chosen to participate in the experiment. The three learning modules of the VCS were used, which challenged the students to plan and manage the construction process of a wooden pavilion, the steel erection of a dormitory, and the concrete placement of the same dormitory. Based on the results the researcher was able to provide evidence supporting the hypothesis that the chosen sample of construction students were able to gain and retain problem-solving skills necessary to solve complex construction simulation problems, no matter what the sequence with which these modules were played. In conclusion, the presented results provide evidence supporting the theory that educational simulation games can help the learning and retention of transferable problem-solving skills, which are necessary to solve complex construction problems.
Telescopio San Pedro Mártir Observatory preliminary design and project approach
NASA Astrophysics Data System (ADS)
Teran, Jose; Lee, William H.; Richer, Michael G.; Sánchez, Beatriz S.; Urdaibay, David; Hill, Derek; Adriaanse, David; Hernandez-Limonchi, Regina
2016-07-01
The Instituto de Astronomia of the Universidad Nacional Autónoma de México (UNAM) along with Instituto Nacional de Astrofisica, Optica y Electronica, the University of Arizona and the Smithsonian Astrophysical Observatory are developing the Telescopio San Pedro Mártir (TSPM) project, a 6.5m diameter optical telescope. M3 Engineering and Technology Corp. (M3) is the design and construction management firm responsible for all site infrastructure, enclosure and support facilities. The Telescopio San Pedro Mártir project (TSPM) will be located within the San Pedro Mártir National Park in Baja California, Mexico at 2,830 m. above sea level, approximately 65 km. east of the Pacific Ocean, 55km west of the Sea of Cortes (Gulf of California) and 180km south of the United States and México border. The aim of the paper is to present the preliminary design of the site infrastructure, enclosure and support facilities to date and share the design and construction approach.
National Ignition Facility project acquisition plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Callaghan, R.W.
The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility (NIF) Project. The scope of the plan describes the procurement activities and acquisition strategy for the following phases of the NIF Project, each of which receives either plant and capital equipment (PACE) or other project cost (OPC) funds: Title 1 and 2 design and Title 3 engineering (PACE); Optics manufacturing facilitization and pilot production (OPC); Convention facility construction (PACE); Procurement, installation, and acceptance testing of equipment (PACE); and Start-up (OPC). Activities that are part of the base Inertialmore » Confinement Fusion (ICF) Program are not included in this plan. The University of California (UC), operating Lawrence Livermore National Laboratory (LLNL) and Los Alamos National Laboratory, and Lockheed-Martin, which operates Sandia National Laboratory (SNL) and the University of Rochester Laboratory for Laser Energetics (UR-LLE), will conduct the acquisition of needed products and services in support of their assigned responsibilities within the NIF Project structure in accordance with their prime contracts with the Department of Energy (DOE). LLNL, designated as the lead Laboratory, will have responsibility for all procurements required for construction, installation, activation, and startup of the NIF.« less
An application of artificial intelligence to automatic telescopes
NASA Technical Reports Server (NTRS)
Swanson, Keith; Drummond, Mark; Bresina, John
1992-01-01
Automatic Photoelectric Telescopes (APT's) allow an astronomer to be removed form the telescope site in both time and space. APT's 'execute' an observation program (a set of observation requests) expressed in an ASCII-based language (ATIS) and collect observation results expressed in this same language. The observation program is currently constructed by a Principal Astronomer from the requests of multiple users; the execution is currently controlled by a simple heuristic dispatch scheduler. Research aimed at improving the use of APT's is being carried out by the Entropy Reduction Engine (ERE) project at NASA Ames. The overall goal of the ERE project is the study and construction of systems that integrate planning, scheduling, and control. This paper discusses the application of some ERE technical results to the improvement of both the scheduling and the operation of APT's.