1983-09-27
monitoring subcontractor activity, DOD officials must take into account practical and cost considerations 20 * *, l o *° as well as legal constraints...AD-A134 967 VALUE ENGINEERING SHOULD BE IMPROYED AS PART OF THE i/i DEFENSE DEPARTMENT’S~ (U) GENERAL ACCOUNTING OFFICE WASHINGTON DC ACCOUNTING AND...RESOLUTION TEST CHART NATIONAL BUREAU OF STANDAR DS -I96 3 -A 7.... REPORT BY THE U.S. & General Accounting Office ,:: Value Engineering Should Be Improved
Code of Federal Regulations, 2012 CFR
2012-10-01
... cost-effective value engineering procedures and processes. Agencies shall provide contractors a... services must require a mandatory value engineering program to reduce total ownership cost in accordance... VALUE ENGINEERING Policies and Procedures 48.102 Policies. (a) As required by Section 36 of the Office...
Code of Federal Regulations, 2013 CFR
2013-10-01
... cost-effective value engineering procedures and processes. Agencies shall provide contractors a... services must require a mandatory value engineering program to reduce total ownership cost in accordance... VALUE ENGINEERING Policies and Procedures 48.102 Policies. (a) As required by Section 36 of the Office...
48 CFR 9904.420-60 - Illustrations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... STANDARDS COST ACCOUNTING STANDARDS 9904.420-60 Illustrations. (a) Business Unit A's engineering department... typing its overhead cost pool. In submitting a proposal, the engineering department assigns several... Section 9904.420-60 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF...
Support to LANL: Cost estimation. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This report summarizes the activities and progress by ICF Kaiser Engineers conducted on behalf of Los Alamos National Laboratories (LANL) for the US Department of Energy, Office of Waste Management (EM-33) in the area of improving methods for Cost Estimation. This work was conducted between October 1, 1992 and September 30, 1993. ICF Kaiser Engineers supported LANL in providing the Office of Waste Management with planning and document preparation services for a Cost and Schedule Estimating Guide (Guide). The intent of the Guide was to use Activity-Based Cost (ABC) estimation as a basic method in preparing cost estimates for DOEmore » planning and budgeting documents, including Activity Data Sheets (ADSs), which form the basis for the Five Year Plan document. Prior to the initiation of the present contract with LANL, ICF Kaiser Engineers was tasked to initiate planning efforts directed toward a Guide. This work, accomplished from June to September, 1992, included visits to eight DOE field offices and consultation with DOE Headquarters staff to determine the need for a Guide, the desired contents of a Guide, and the types of ABC estimation methods and documentation requirements that would be compatible with current or potential practices and expertise in existence at DOE field offices and their contractors.« less
Code of Federal Regulations, 2010 CFR
2010-10-01
... VALUE ENGINEERING Policies and Procedures 48.102 Policies. (a) As required by Section 36 of the Office... cost-effective value engineering procedures and processes. Agencies shall provide contractors a... engineering provisions in appropriate supply, service, architect-engineer and construction contracts as...
34 CFR 637.41 - What are the cost restrictions on design project grants?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 34 Education 3 2013-07-01 2013-07-01 false What are the cost restrictions on design project grants? 637.41 Section 637.41 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT...
34 CFR 637.41 - What are the cost restrictions on design project grants?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 34 Education 3 2014-07-01 2014-07-01 false What are the cost restrictions on design project grants? 637.41 Section 637.41 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT...
34 CFR 637.41 - What are the cost restrictions on design project grants?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 34 Education 3 2011-07-01 2011-07-01 false What are the cost restrictions on design project grants? 637.41 Section 637.41 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT...
34 CFR 637.41 - What are the cost restrictions on design project grants?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 34 Education 3 2012-07-01 2012-07-01 false What are the cost restrictions on design project grants? 637.41 Section 637.41 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT...
34 CFR 637.41 - What are the cost restrictions on design project grants?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 34 Education 3 2010-07-01 2010-07-01 false What are the cost restrictions on design project grants? 637.41 Section 637.41 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT...
Cost and schedule analytical techniques development
NASA Technical Reports Server (NTRS)
1994-01-01
This contract provided technical services and products to the Marshall Space Flight Center's Engineering Cost Office (PP03) and the Program Plans and Requirements Office (PP02) for the period of 3 Aug. 1991 - 30 Nov. 1994. Accomplishments summarized cover the REDSTAR data base, NASCOM hard copy data base, NASCOM automated data base, NASCOM cost model, complexity generators, program planning, schedules, NASA computer connectivity, other analytical techniques, and special project support.
18 CFR 367.52 - Overhead construction costs.
Code of Federal Regulations, 2010 CFR
2010-04-01
... ACT Service Company Property Instructions § 367.52 Overhead construction costs. (a) All overhead construction costs, such as engineering, supervision, general office salaries and expenses, construction... costs. 367.52 Section 367.52 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY...
18 CFR 367.52 - Overhead construction costs.
Code of Federal Regulations, 2012 CFR
2012-04-01
... ACT Service Company Property Instructions § 367.52 Overhead construction costs. (a) All overhead construction costs, such as engineering, supervision, general office salaries and expenses, construction... costs. 367.52 Section 367.52 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY...
NASA Technical Reports Server (NTRS)
Jack, John; Kwan, Eric; Wood, Milana
2011-01-01
PRICE H was introduced into the JPL cost estimation tool set circa 2003. It became more available at JPL when IPAO funded the NASA-wide site license for all NASA centers. PRICE H was mainly used as one of the cost tools to validate proposal grassroots cost estimates. Program offices at JPL view PRICE H as an additional crosscheck to Team X (JPL Concurrent Engineering Design Center) estimates. PRICE H became widely accepted ca, 2007 at JPL when the program offices moved away from grassroots cost estimation for Step 1 proposals. PRICE H is now one of the key cost tools used for cost validation, cost trades, and independent cost estimates.
NASA Engineering and Technology Advancement Office: A proposal to the administrator
NASA Technical Reports Server (NTRS)
Schulze, Norman R.
1993-01-01
NASA has continually had problems with cost, schedule, performance, reliability, quality, and safety aspects in programs. Past solutions have not provided the answers needed, and a major change is needed in the way of doing business. A new approach is presented for consideration. These problems are all engineering matters, and therefore, require engineering solutions. Proper engineering tools are needed to fix engineering problems. Headquarters is responsible for providing the management structure to support programs with appropriate engineering tools. A guide to define those tools and an approach for putting them into place is provided. Recommendations include establishing a new Engineering and Technology Advancement Office, requesting a review of this proposal by the Administrator since this subject requires a top level decision. There has been a wide peer review conducted by technical staff at Headquarters, the Field Installations, and others in industry as discussed.
Mechanical and Thermal Engineering Sciences | Research | NREL
. Geothermal Energy Developing cost-competitive technologies to advance the use of geothermal energy areas of energy efficiency, sustainable transportation, and renewable power. We provide engineering and scientific expertise to a variety of federal agencies, including the DOE Office of Energy Efficiency and
1994-09-01
Institute of Technology, Wright- Patterson AFB OH, January 1994. 4. Neter, John and others. Applied Linear Regression Models. Boston: Irwin, 1989. 5...Technology, Wright-Patterson AFB OH 5 April 1994. 29. Neter, John and others. Applied Linear Regression Models. Boston: Irwin, 1989. 30. Office of
NASA Technical Reports Server (NTRS)
1982-01-01
Barnett Banks of Florida, Inc. operates 150 banking offices in 80 Florida cities. Banking offices have computerized systems for processing deposits or withdrawals in checking/savings accounts, and for handling commercial and installment loan transactions. In developing a network engineering design for the terminals used in record processing, an affiliate, Barnett Computing Company, used COSMIC's STATCOM program. This program provided a reliable network design tool and avoided the cost of developing new software.
River of Interests: Water Management in South Florida and the Everglades, 1948-2010
2011-07-01
Facing Significant Delays, Implementa- tion Challenges, and Rising Costs . GAO-07-520. Washington, D.C: U.S. Government Accountability Office, 2007...General Accounting Office HQUSACE Headquarters, U.S. Army Corps of Engineers IIF Internal Improvement Fund JDAR Jacksonville District...Florida has two seasons: wet and dry. The wet season, extending roughly from May through October, accounts for three- quarters of the average annual
ERIC Educational Resources Information Center
Slebodnick, Edward B.; And Others
Volume 1 of the study reports a work effort to define and give guidelines for the acquisition of cost-effective alternative continuing education (CE) systems to prevent the technological obsolescence of Air Force military scientific and engineering officer personnel. A detailed background survey of the problem was conducted using questionnaires,…
1993-09-01
E, below. The forms are approved for electronic generation and distribution. * 1-7 0 C~L0 _ 0 C 0I U)2 Ea 0 0 0 U! 0 3: X 9 0 V~ 0 CD co L. 8p 6 V- I...and inspection by installation personnel. e. Costs above installation level, such as costs attributable to Engineer Districts, Public Works Offices...the major command or engineering field dMsion ’). For DoD Component area summary reports, leave bla’*. C-1 Go %a M -ý - f N 4I- -t C-4.-1 .7 %10O O
1980-12-01
VI and jA-VI] [p. 46]. This article also gives a pertinent quote attributed to Vroom . job satisfaction is closely affected by the amounts of rewards...Presentation of Typical QOAFL Question . . . . 40 6. Comparison of Mean Quality of Air Force Life Factor Satisfaction Levels . ....... . 41 7...Scientific Officers (AFSCs 2XXX) ...... ................ . 150 A-II. Mean Values of Satisfaction and Importance Ratings of Job Characteristics, and Their
The Office of General Counsel (OGC) has an ongoing business process engineering and business process automation initiative which has helped the office reduce administrative labor costs while increasing employee effectiveness. Supporting this effort is a system of automated routines accessible through a portal' interface called OGC Dashboard. The dashboard helps OGC track work progress, legal case load, written work products such as legal briefs and advice, and scheduling processes such as employee leave plans (via calendar) and travel compensatory time off.
Manufacturing cost/design system: A CAD/CAM dialogue
NASA Technical Reports Server (NTRS)
Loshigian, H. H.; Rachowitz, B. I.; Judson, D.
1980-01-01
The development of the Manufacturing Cost/Design System (MC/DS) will provide the aerospace design engineer a tool with which to perform heretofore impractical design manufacturing cost tradeoffs. The Air Force Integrated Computer Aided Manufacturing (ICAM) Office has initiated the development and demonstration of an MC/DS which, when fully implemented, will integrate both design and manufacturing data bases to provide real time visibility into the manufacturing costs associated with various design options. The first release of a computerized system will be made before the end of 1981.
NASA Technical Reports Server (NTRS)
Bordelon, Wayne J., Jr.; Ballard, Rick O.; Gerrish, Harold P., Jr.
2006-01-01
With the announcement of the Vision for Space Exploration on January 14, 2004, there has been a renewed interest in nuclear thermal propulsion. Nuclear thermal propulsion is a leading candidate for in-space propulsion for human Mars missions; however, the cost to develop a nuclear thermal rocket engine system is uncertain. Key to determining the engine development cost will be the engine requirements, the technology used in the development and the development approach. The engine requirements and technology selection have not been defined and are awaiting definition of the Mars architecture and vehicle definitions. The paper discusses an engine development approach in light of top-level strategic questions and considerations for nuclear thermal propulsion and provides a suggested approach based on work conducted at the NASA Marshall Space Flight Center to support planning and requirements for the Prometheus Power and Propulsion Office. This work is intended to help support the development of a comprehensive strategy for nuclear thermal propulsion, to help reduce the uncertainty in the development cost estimate, and to help assess the potential value of and need for nuclear thermal propulsion for a human Mars mission.
Project Interface Requirements Process Including Shuttle Lessons Learned
NASA Technical Reports Server (NTRS)
Bauch, Garland T.
2010-01-01
Most failures occur at interfaces between organizations and hardware. Processing interface requirements at the start of a project life cycle will reduce the likelihood of costly interface changes/failures later. This can be done by adding Interface Control Documents (ICDs) to the Project top level drawing tree, providing technical direction to the Projects for interface requirements, and by funding the interface requirements function directly from the Project Manager's office. The interface requirements function within the Project Systems Engineering and Integration (SE&I) Office would work in-line with the project element design engineers early in the life cycle to enhance communications and negotiate technical issues between the elements. This function would work as the technical arm of the Project Manager to help ensure that the Project cost, schedule, and risk objectives can be met during the Life Cycle. Some ICD Lessons Learned during the Space Shuttle Program (SSP) Life Cycle will include the use of hardware interface photos in the ICD, progressive life cycle design certification by analysis, test, & operations experience, assigning interface design engineers to Element Interface (EI) and Project technical panels, and linking interface design drawings with project build drawings
1980-12-01
underrepresentation . As one can see from Figure 2-4, the greatest density of women is in traditional skills, the medical/dental and administrat- ion... Industrial Elec Motors/Generators Electric Wiring Food Service Gas Engine Repair General Merch Sales Graphic Arts Hotel & Motel Mgt Masonry Office...Small Engine Repair (marine ment of Vocational and industrial ) Education Welding Truck Driving Simulator Connecticut State Depart- Training ment of
Projected Commercial Maritime Activity in the Western Arctic
1977-10-01
for Polar Icebreaking 1967. Coast GuarC, U.S., Office of Engineering, Life Cycle Costs of Diesel Electric Propulsion Plants for a 20,000 SHP Polar...Dynamics, Electric Boat Division, Program Plan for Arctic Offshore Drilling System. 1970. Geological Survey, U.S., Mineral and Water Resources of Alaska...Port and Ocean EngineerLng under Arctic Conditions, Vol. I, Trondheim, Norway: Terhnical Institute of ’Norway, Page 37 Weeks, W. F. and Frankenstein
Cost and Schedule Analytical Techniques Development
NASA Technical Reports Server (NTRS)
1996-01-01
This Final Report summarizes the activities performed by Science Applications International Corporation (SAIC) for the base contract year from December 1, 1994 through November 30, 1995. The Final Report is in compliance with Paragraph 5 of Section F of the contract. This CSATD contract provides technical services and products to the NASA Marshall Space Flight Center's (MSFC) Engineering Cost Office (PP03) and the Program Plans and Requirements Office (PP02). Detailed Monthly Progress Reports were submitted to MSFC in accordance with the contract's Statement of Work Section IV "Reporting and Documentation". These reports spelled out each month's specific work accomplishments, deliverables submitted, major meetings held, and other pertinent information. This Final Report will summarize these activities at a higher level.
Low-Cost Approach to the Design and Fabrication of a LOX/RP-1 Injector
NASA Technical Reports Server (NTRS)
Shadoan, Michael D.; Sparks, Dave L.; Turner, James E. (Technical Monitor)
2000-01-01
NASA Marshall Space Flight Center (MSFC) has designed, built, and is currently testing Fastrac, a liquid oxygen (LOX)/RP-1 fueled 60K-lb thrust class rocket engine. One facet of Fastrac, which makes it unique is that it is the first large-scale engine designed and developed in accordance with the Agency's mandated "faster, better, cheaper" (FBC) program policy. The engine was developed under the auspices of MSFC's Low Cost Boost Technology office. Development work for the main injector actually began in 1993 in subscale form. In 1996, work began on the full-scale unit approximately 1 year prior to initiation of the engine development program. In order to achieve the value goals established by the FBC policy, a review of traditional design practices was necessary. This internal reevaluation would ultimately challenge more conventional methods of material selection. design process, and fabrication techniques. The effort was highly successful. This "new way" of thinking has resulted in an innovative injector design, one with reduced complexity and significantly lower cost. Application of lessons learned during this effort to new or existing designs can have a similar effect on costs and future program successes.
Should Cost: A Strategy for Managing Military Systems Money
2016-03-01
telecom . Of the numerous SCIs available, the chief financial officer for the portfolio chose the QF-16 Engine Management (see photo). The program... telecoms and network discussions of what has been done and what will come down as future system and policy changes. Iterative results included
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
As part of a two-year project to demonstrate energy efficiency measures, renewable energy generation, and energy systems integration, the National Renewable Energy Laboratory (NREL) has identified advanced plug load controls as a promising technology for reducing energy use and related costs in the U.S. Navy's Naval Facilities Engineering Command (NAVFAC) office spaces.
NASA Astrophysics Data System (ADS)
Slagle, James H.; Hill, John M.; Davison, Warren B.; Hart, Wood; Teran, Jose U.
1998-08-01
Planning, estimating, and building a telescope and its enclosure within a budget is a challenge to any project staff. The Large Binocular Telescope (LBT) project office goal has been to break every phase of the project into small packages and competitively bid the packages. In this way the project office can minimize costs and keep the project budget from escalating out of control. This paper will discuss both the unique and common problems associated with the building of telescopes into the next millennium. The discussion is centered on the planning and execution phases of construction for the LBT, located on Mt. Graham in Arizona. The paper will discuss the effects of delays on the actual start of the telescope due to environmental issues and the impact the delays had on design and budget. The paper will provide the solutions that have been incorporated by the LBT project office to maximize the quality of construction while holding costs to a minimum. The use of a team approach by the contractors, engineers, and the project office has been successful in maintaining quality construction at a reasonable cost.
The cost of biomedical equipment repair and maintenance: results of a survey.
Cohen, T
1982-01-01
The survey presented in this paper shows that for 19 large hospitals the average ratio of equipment repair costs to acquisition cost was 7.4%. In addition, this survey shows that costs such as rent for building space, utilities, and test equipment are not included in many clinical engineering department budgets. This is one reason for the divergent cost data reported by the various hospitals. These costs should be considered particularly for comparisons between in-house service costs and other sources of service. It seems that, of the indicators observed in this survey, equipment acquisition cost provides the best indicator for equipment maintenance costs. All hospital finance officers should have acquisition value information, because this information is used in calculating capital equipment depreciation. This information should also be available to clinical engineers. In addition, procedures need to be set up so that the total annual repair and maintenance costs can be easily obtained from hospital finance departments. Providing the clinical engineer with this type of data will allow further analysis of repair cost and will aid in long-term planning for the hospital. The ratio of equipment repair cost to acquisition value may be useful as a tool to predict future costs of a given hospital's medical equipment maintenance. This tool may also be useful as a measurement of the effectiveness of a change in a hospital's approach to biomedical equipment maintenance. Further work must be done to standardize equipment maintenance cost reporting so that more detailed comparisons can be made.
Marshall (MSFC) 3D Printing Media Resource
2018-06-12
Edited b-roll video from NASA’s Marshall Space Flight Center in Huntsville, Ala. Engineers at Marshall are pioneering and advancing new additive manufacturing techniques that can greatly reduce costs and development of rocket engines and other spacecraft components. Marshall teams also managed the development of the International Space Station’s first 3D printer. For more information and/or more detailed footage please contact the Marshall Office of Communications. PAO: Jennifer Stanfield, 256-544-0034, Jennifer.stanfield@nasa.gov
Army’s Management of Gray Eagle Spare Parts Needs Improvement (REDACTED)
2016-04-29
contracting officers purchased Heavy Fuel Engine 2.0 Liter Turbochargers at an average unit cost of for a total value of General Atomics proposed...Liter Turbocharger to establish an accurate baseline and could potentially overpay on future contracts. See Figure 10 for a picture of the Heavy...Fuel Engine 2.0 Liter Turbocharger . 19 Federal Acquisition Regulation 15.402, “Pricing Policy,” May 29, 2014. 20 Federal Acquisition Regulation 15.404
Innovations for Requirements Engineering
2008-01-01
bidding decision system. Trade Managemen t Production Management Cost Management Settlement Forecasting & Decision LDAS Electricity Market MDAS Figure...i NAVAL POSTGRADUATE SCHOOL Monterey, California 93943-5000 Daniel T . Oliver Leonard A. Ferrari...Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of
13 CFR 134.609 - What is the difference between a fee and an expense?
Code of Federal Regulations, 2010 CFR
2010-01-01
... connection with your case. An expense is the cost to you of any study, analysis, engineering report, test, project, or similar matter prepared in connection with your case. ... ADMINISTRATION RULES OF PROCEDURE GOVERNING CASES BEFORE THE OFFICE OF HEARINGS AND APPEALS Implementation of the...
Cost and Schedule Analytical Techniques Development: Option 1
NASA Technical Reports Server (NTRS)
1996-01-01
This Final Report summarizes the activities performed by Science Applications International Corporation (SAIC) for the base contract year from December 1, 1995 through November 30, 1996. The Final Report is in compliance with Paragraph 5 of Section F of the contract. This CSATD contract provides technical services and products to the NASA Marshall Space Flight Center's (MSFC) Engineering Cost Office (PPO3) and the Program Plans and Requirements Officer (PPO2). Detailed Monthly Progress Reports were submitted to MSFC in accordance with the contract's Statement of Work Section IV "Reporting and Documentation". These reports spelled out each month's specific work accomplishments, deliverables submitted, major meetings held, and other pertinent information. This Final Report will summarize these activities at a higher level.
MC-1 Engine Valves, Lessons Learned
NASA Technical Reports Server (NTRS)
Laszar, John
2003-01-01
Many lessons were learned during the development of the valves for the MC-1 engine. The purpose of this report is to focus on a variety of issues related to the engine valves and convey the lessons learned. This paper will not delve into detailed technical analysis of the components. None of the lessons learned are new or surprising, but simply reinforce the importance of addressing the details of the design early, at the component level. The Marshall Space Flight Center (MSFC), Huntsville, Alabama developed the MC-1 engine, a LOX / FW-1, 60,000 pound thrust engine. This engine was developed under the Low Cost Boost Technology office at MSFC and proved to be a very successful project for the MSFC Propulsion team and the various subcontractors working the development of the engine and its components.
NASA Astrophysics Data System (ADS)
Orr, Dwayne
CSBF Engineering Overview Dwayne Orr (Presenting Author) Columbia Scientific Balloon Facility, Palestine, Texas (USA) Dwayne.Orr@csbf.nasa.gov The Columbia Scientific Balloon Facility (CSBF) at Palestine, Texas provides operational and engineering support for the launch of NASA Scientific Balloons. Over the years with the support of the NASA Balloon Program Office, CSBF has developed unique flight systems with the focus of providing a highly reliable, cost effective medium for giving Scientist’s access to a near space environment. This paper will provide an overview of the CSBF flight systems with an emphasis on recent developments and plans for the future.
46 CFR 11.505 - National engineer officer endorsements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 1 2014-10-01 2014-10-01 false National engineer officer endorsements. 11.505 Section... REQUIREMENTS FOR OFFICER ENDORSEMENTS Professional Requirements for National Engineer Officer Endorsements § 11.505 National engineer officer endorsements. Figure 11.505(a) illustrates the national engineering...
46 CFR 11.505 - Engineer officer structure.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 1 2010-10-01 2010-10-01 false Engineer officer structure. 11.505 Section 11.505 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY MERCHANT MARINE OFFICERS AND SEAMEN REQUIREMENTS FOR OFFICER ENDORSEMENTS Professional Requirements for Engineer Officer § 11.505 Engineer officer structure...
46 CFR 11.505 - Engineer officer structure.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 1 2013-10-01 2013-10-01 false Engineer officer structure. 11.505 Section 11.505 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY MERCHANT MARINE OFFICERS AND SEAMEN REQUIREMENTS FOR OFFICER ENDORSEMENTS Professional Requirements for Engineer Officer § 11.505 Engineer officer structure...
46 CFR 11.505 - Engineer officer structure.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 1 2011-10-01 2011-10-01 false Engineer officer structure. 11.505 Section 11.505 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY MERCHANT MARINE OFFICERS AND SEAMEN REQUIREMENTS FOR OFFICER ENDORSEMENTS Professional Requirements for Engineer Officer § 11.505 Engineer officer structure...
46 CFR 11.505 - Engineer officer structure.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 1 2012-10-01 2012-10-01 false Engineer officer structure. 11.505 Section 11.505 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY MERCHANT MARINE OFFICERS AND SEAMEN REQUIREMENTS FOR OFFICER ENDORSEMENTS Professional Requirements for Engineer Officer § 11.505 Engineer officer structure...
34 CFR 21.33 - Allowable fees and expenses.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 34 Education 1 2010-07-01 2010-07-01 false Allowable fees and expenses. 21.33 Section 21.33 Education Office of the Secretary, Department of Education EQUAL ACCESS TO JUSTICE How Does One Apply for an... expenses. (3) The cost of any study, analysis, engineering report, test, or project related to the...
Ceramic Technology Project semiannual progress report, April 1992--September 1992
DOE Office of Scientific and Technical Information (OSTI.GOV)
Johnson, D.R.
1993-07-01
This project was developed to meet the ceramic technology requirements of the DOE Office of Transportation Systems` automotive technology programs. Significant progress in fabricating ceramic components for DOE, NASA, and DOE advanced heat engine programs show that operation of ceramic parts in high-temperature engines is feasible; however, addition research is needed in materials and processing, design, and data base and life prediction before industry will have a sufficient technology base for producing reliable cost-effective ceramic engine components commercially. A 5-yr project plan was developed, with focus on structural ceramics for advanced gas turbine and diesel engines, ceramic bearings and attachments,more » and ceramic coatings for thermal barrier and wear applications in these engines.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sanford, P.C.; Moe, M.A.; Hombach, W.G.
2013-07-01
The Department of Energy (DOE) Office of Environmental Management (EM) has developed a web-accessible database to collect actual cost data from completed EM projects to support cost estimating and analysis. This Environmental Cost Analysis System (ECAS) database was initially deployed in early 2009 containing the cost and parametric data from 77 decommissioning, restoration, and waste management projects completed under the Rocky Flats Closure Project. In subsequent years we have added many more projects to ECAS and now have a total of 280 projects from 8 major DOE sites. This data is now accessible to DOE users through a web-based reportingmore » tool that allows users to tailor report outputs to meet their specific needs. We are using it as a principal resource supporting the EM Consolidated Business Center (EMCBC) and the EM Applied Cost Engineering (ACE) team cost estimating and analysis efforts across the country. The database has received Government Accountability Office review as supporting its recommended improvements in DOE's cost estimating process, as well as review from the DOE Office of Acquisition and Project Management (APM). Moving forward, the EMCBC has developed a Special Contract Requirement clause or 'H-Clause' to be included in all current and future EMCBC procurements identifying the process that contractors will follow to provide DOE their historical project data in a format compatible with ECAS. Changes to DOE O 413.3B implementation are also in progress to capture historical costs as part of the Critical Decision project closeout process. (authors)« less
Facility Energy Decision System (FEDS) Assessment Report for Fort Buchanan, Puerto Rico
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chvala, William D.; Solana, Amy E.; Dixon, Douglas R.
2005-02-01
This report documents the findings of the Facility Energy Decision System (FEDS) assessment at Fort Buchanan, Puerto Rico, by a team of PNNL engineers under contract to the Installation Management Agency (IMA) Southeast Region Office (SERO). Funding support was also provided by the Department of Energy's Federal Energy Management Program. The purpose of the assessment was to determine how energy is consumed at Fort Buchanan, identify the most cost-effective energy retrofit measures, and calculate the potential energy and cost savings.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kora, Angela R.; Brown, Daryl R.; Dixon, Douglas R.
2010-03-09
This report documents an assessment was performed by a team of engineers from Pacific Northwest National Laboratory (PNNL) under contract to the Installation Management Command (IMCOM) Pacific Region Office (PARO). The effort used the Facility Energy Decision System (FEDS) model to determine how energy is consumed at five U.S. Army Garrison-Japan (USAG-J) installations in the Honshu area, identify the most cost-effective energy retrofit measures, and calculate the potential energy and cost savings.
The Lunar Lander "HabiTank" Concept
NASA Technical Reports Server (NTRS)
Kennedy, Kriss J.
2007-01-01
This paper will summarize the study that was conducted under the auspices of the National Aeronautics and Space Administration (NASA), lead by Johnson Space Center s Engineering Directorate in support of the Lunar Lander Preparatory Study (LLPS) as sponsored by the Constellation Program Office (CxPO), Advanced Projects Office (APO). The lunar lander conceptual design and analysis is intended to provide an understanding of requirements for human space exploration of the Moon using the Advanced Projects Office Pre-Lander Project Office selected "HabiTank" Lander concept. In addition, these analyses help identify system "drivers," or significant sources of cost, performance, risk, and schedule variation along with areas needing technology development. Recommendations, results, and conclusions in this paper do not reflect NASA policy or programmatic decisions. This paper is an executive summary of this study.
Low-Cost In-Fill Installation for High-Energy-Saving, Dynamic Windows
2017-07-01
greenhouse gas, HVAC, low emissivity, military construction, photovoltaic, physical vapor deposition, solar heat gain coefficient... Physical vapor deposition ROICC Resident Officer In Charge of Construction SHGC Solar heat gain coefficient S/RM Sustainment, Restoration, and...PERMITS AND REGULATIONS Regulations - The demonstration project planning and implementation followed US Army Corps of Engineers Safety and Health
ERIC Educational Resources Information Center
Hahn, H. A.; And Others
The purposes of this research were to evaluate the cost effectiveness of using Asynchronous Computer Conferencing (ACC) and to develop guidelines for effectively conducting high quality military training using ACC. The evaluation used a portion of the Engineer Officer Advanced Course (EOAC) as a test bed. Course materials which taught the same…
The Computing And Interdisciplinary Systems Office: Annual Review and Planning Meeting
NASA Technical Reports Server (NTRS)
Lytle, John K.
2003-01-01
The goal of this research is to develop an advanced engineering analysis system that enables high-fidelity, multi-disciplinary, full propulsion system simulations to be performed early in the design process (a virtual test cell that integrates propulsion and information technologies). This will enable rapid, high-confidence, cost-effective design of revolutionary systems.
2016-07-01
Common Risk Model for Dams ( CRM -D) Methodology,” for the Director, Cost Assessment and Program Evaluation, Office of Secretary of Defense and the...for Dams ( CRM -D), developed by the U.S. Army Corps of Engineers (USACE) in collaboration with the Institute for Defense Analyses (IDA) and the U.S...and cyber security risks across a portfolio of dams, and informing decisions on how to mitigate those risks. The CRM -D can effectively quantify the
77 FR 34073 - Value Engineering
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-08
... OFFICE OF MANAGEMENT AND BUDGET Office of Federal Procurement Policy Value Engineering AGENCY... Office of Management and Budget Circular No. A-131, ``Value Engineering''. SUMMARY: The Office of Federal...- 131, Value Engineering, to update and reinforce policies associated with the consideration and use of...
78 FR 78399 - Value Engineering
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-26
... OFFICE OF MANAGEMENT AND BUDGET Office of Federal Procurement Policy Value Engineering AGENCY... to Office of Management and Budget Circular No. A-131, ``Value Engineering''. SUMMARY: The Office of... revisions to OMB Circular A-131, Value Engineering, to update and reinforce policies associated with the...
Creating and Sustaining Effective Partnership between Government and Industry
2011-04-30
defense industry, fielding, contracting, interoperability, organizational behavior, risk management , cost estimating, and many others. Approaches...Finance from Cameron University and an MBA from Drury University. [scott.fouse@dau.mil] Allen Green—Engineer and Program Manager , SAIC, Inc...Program Executive Officer SHIPS • Commander, Naval Sea Systems Command • Army Contracting Command, U.S. Army Materiel Command • Program Manager , Airborne
46 CFR 15.915 - Engineer Officer Endorsements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 1 2010-10-01 2010-10-01 false Engineer Officer Endorsements. 15.915 Section 15.915 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY MERCHANT MARINE OFFICERS AND SEAMEN MANNING REQUIREMENTS Equivalents § 15.915 Engineer Officer Endorsements. The following licenses and MMC officer...
46 CFR 15.915 - Engineer Officer Endorsements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 1 2012-10-01 2012-10-01 false Engineer Officer Endorsements. 15.915 Section 15.915 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY MERCHANT MARINE OFFICERS AND SEAMEN MANNING REQUIREMENTS Equivalents § 15.915 Engineer Officer Endorsements. The following licenses and MMC officer...
46 CFR 15.915 - Engineer Officer Endorsements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 1 2011-10-01 2011-10-01 false Engineer Officer Endorsements. 15.915 Section 15.915 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY MERCHANT MARINE OFFICERS AND SEAMEN MANNING REQUIREMENTS Equivalents § 15.915 Engineer Officer Endorsements. The following licenses and MMC officer...
46 CFR 15.915 - Engineer Officer Endorsements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 1 2013-10-01 2013-10-01 false Engineer Officer Endorsements. 15.915 Section 15.915 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY MERCHANT MARINE OFFICERS AND SEAMEN MANNING REQUIREMENTS Equivalents § 15.915 Engineer Officer Endorsements. The following licenses and MMC officer...
46 CFR 15.915 - Engineer officer endorsements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 1 2014-10-01 2014-10-01 false Engineer officer endorsements. 15.915 Section 15.915 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY MERCHANT MARINE OFFICERS AND SEAMEN MANNING REQUIREMENTS Equivalents § 15.915 Engineer officer endorsements. The following licenses and MMC officer...
Engineering Technical Support Center Annual Report Fiscal ...
The United States Environmental Protection Agency (EPA or Agency) Office of Research and Development (ORD) created the Engineering Technical Support Center (ETSC) in 1987, one of several technical support centers created as part of the Technical Support Project (TSP). ETSC provides engineering expertise to Agency program and regional offices and remediation teams working at contaminated sites across the country. The ETSC is operated within ORD’s Land Remediation and Pollution Control Division (LRPCD) of the National Risk Management Research Laboratory (NRMRL) in Cincinnati, Ohio. The ETSC’s mission is to provide site-specific scientific and engineering technical support to Remedial Project Managers, On-Scene Coordinators, and other remediation personnel at contaminated sites. This allows local, regional, or national authorities to work more quickly, efficiently, and cost effectively, while also increasing the technical experience of the remediation team. Since its inception, the ETSC has supported countless projects across all EPA Regions in almost all states and territories. This report highlights significant projects the ETSC supported in fiscal year 2015 (FY15). These projects addressed an array of environmental scenarios, such as remote mining contamination, expansive landfill waste, cumulative impacts from multiple contamination sources, and persistent threats from abandoned industrial sites. Constructing and testing new and innovative treatment technol
Ceramic Technology for Advanced Heat Engines Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1989-08-01
The Ceramic Technology for Advanced Heat Engines Project was developed by the Department of Energy's Office of Transportation Systems (OTS) in Conservation and Renewable Energy. This project, part of the OTS's Advanced Materials Development Program, was developed to meet the ceramic technology requirements of the OTS's automotive technology programs. Significant accomplishments in fabricating ceramic components for the Department of Energy (DOE), National Aeronautics and Space Administration (NASA), and Department of Defense (DoD) advanced heat engine programs have provided evidence that the operation of ceramic parts in high-temperature engine environments is feasible. However, these programs have also demonstrated that additional researchmore » is needed in materials and processing development, design methodology, and data base and life prediction before industry will have a sufficient technology base from which to produce reliable cost-effective ceramic engine components commercially.« less
Achieving Energy Savings in Municipal Construction in Long Beach, CA
DOE Office of Scientific and Technical Information (OSTI.GOV)
Parrish, Kristen; Regnier, Cindy
Long Beach Gas and Oil (LBGO), the public gas utility in Long Beach, California, partnered with the U.S. Department of Energy (DOE) to develop and implement solutions to build a new, low-energy modular office building that is at least 50% below requirements set by Energy Standard 90.1-2007 of the American Society of Heating, Refrigerating, and Air-conditioning Engineers (ASHRAE), the American National Standards Institute (ANSI), and the Illuminating Engineering Society of America (IESNA) as part of DOE’s Commercial Building Partnerships (CBP) program.3 The LBGO building, which demonstrates that modular construction can be very energy efficient, is expected to exceed the ASHRAEmore » baseline by about 45%. The new 15,000-square foot (ft2) LBGO office building has two stories and houses private offices, open-plan cubicle offices, and a conference room and call center on the second floor. The building’s modular nature allowed LBGO to realize the cost benefits of fasttracked construction while saving substantial energy and reducing operational costs. The project was funded by the utility’s ratepayer revenue, which imposed a tight budget limit. The design process was a collaborative effort involving LBGO and its design-build team, Lawrence Berkeley National Laboratory (Berkeley Lab), and subcontractors Stantec (formerly Burt Hill) and LHB Inc. The team proposed efficiency measures based on computer modeling of the building in full compliance with ASHRAE 90.1-2007; in the modeled building, the lighting and cooling systems were the largest energy users, so increasing the efficiency of these systems was a top priority. Promising measures were modeled to estimate their energy performance, and each measure was evaluated for its feasibility within the budget.« less
Review and evaluation of automotive fuel conservation technologies. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Siegel, H.M.; Schwarz, R.; Andon, J.
1981-12-01
To support the Office of Research and Development of the National Highway Traffic Safety Administration with focused studies in areas affecting automotive fuel economy and related safety issues, a series of in-depth studies were carried out: Fuel Consumption Estimates of Stratified Charge Rotary Engines Installed in Five Vehicles; Oldsmobile Omega X Body Baseline Weight Data; GM X Body Material Substitution Weight Reduction/Cost Effectiveness Study; Calspan RSV Restraint System Cost Study; FMVSS No. 208 Extension to Light Trucks, Vans, and MPV's - Cost Lead Time Study; Multipiece Rims for Trucks, Buses, and Trailers; Identifying Design Changes, Cost Impacts and Manufacturing Leadmore » Times to Upgrade FMVSS 114 for Passenger Cars, Trucks, and MPV's; Ford Escort GL Baseline Weight Data.« less
46 CFR 11.950 - Examination subjects for engineer officer endorsements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 1 2014-10-01 2014-10-01 false Examination subjects for engineer officer endorsements... subjects for engineer officer endorsements. Table 1 to § 11.950 gives the codes used in Table 2 to § 11.950 for engineer officer endorsements. Table 2 to § 11.950 indicates the examination subjects for each...
NASA Astrophysics Data System (ADS)
Orr, Dwayne
The Columbia Scientific Balloon Facility (CSBF) at Palestine, Texas provides operational and engineering support for the launch of NASA Scientific Balloons. Over the years with the support of the NASA Balloon Program Office, CSBF has developed unique flight systems with the focus of providing a highly reliable, cost effective medium for giving Scientist's access to a near space environment. This paper will provide an overview of the CSBF flight systems with an emphasis on recent developments and plans for the future including: RIP Stitch -Parachute Shock Attenuation system, MIP -Micro Instrumentation Package, GAPR -Gondola Automatic Parachute Release system, NASA TDRSS High Gain Antenna system, Superpressure flight video systems
ERIC Educational Resources Information Center
1967
A CASE STUDY BY A SENIOR TRAINING OFFICER OF THE BRITISH ENGINEERING INDUSTRIAL TRAINING BOARD SHOWS WHY A FIRM MUST EXAMINE IN DETAIL A NUMBER OF FACTORS TO DETERMINE WHERE TO APPLY ITS TRAINING EFFORT. EXCESSIVE LABOR COSTS MAY BE ATTRIBUTED TO INADEQUATE OR INAPPROPRIATE INITIAL TRAINING, HIGH LABOR TURNOVER DUE TO LOW WAGES, ESTABLISHMENT OF…
ANL statement of site strategy for computing workstations
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fenske, K.R.; Boxberger, L.M.; Amiot, L.W.
1991-11-01
This Statement of Site Strategy describes the procedure at Argonne National Laboratory for defining, acquiring, using, and evaluating scientific and office workstations and related equipment and software in accord with DOE Order 1360.1A (5-30-85), and Laboratory policy. It is Laboratory policy to promote the installation and use of computing workstations to improve productivity and communications for both programmatic and support personnel, to ensure that computing workstations acquisitions meet the expressed need in a cost-effective manner, and to ensure that acquisitions of computing workstations are in accord with Laboratory and DOE policies. The overall computing site strategy at ANL is tomore » develop a hierarchy of integrated computing system resources to address the current and future computing needs of the laboratory. The major system components of this hierarchical strategy are: Supercomputers, Parallel computers, Centralized general purpose computers, Distributed multipurpose minicomputers, and Computing workstations and office automation support systems. Computing workstations include personal computers, scientific and engineering workstations, computer terminals, microcomputers, word processing and office automation electronic workstations, and associated software and peripheral devices costing less than $25,000 per item.« less
Hubble Space Telescope: cost reduction by re-engineering telemetry processing and archiving
NASA Astrophysics Data System (ADS)
Miebach, Manfred P.
1998-05-01
The Hubble Space Telescope (HST), the first of NASA's Great Observatories, was launched on April 24, 1990. The HST was designed for a minimum fifteen-year mission with on-orbit servicing by the Space Shuttle System planned at approximately three-year intervals. Major changes to the HST ground system are planned to be in place for the third servicing mission in December 1999. The primary objectives of the ground system reengineering effort, a project called 'vision December 1999. The primary objectives of the ground system re-engineering effort, a project called 'vision 2000 control center systems (CCS)', are to reduce both development and operating costs significantly for the remaining years of HST's lifetime. Development costs will be reduced by providing a modern hardware and software architecture and utilizing commercial of f the shelf (COTS) products wherever possible. Operating costs will be reduced by eliminating redundant legacy systems and processes and by providing an integrated ground system geared toward autonomous operation. Part of CCS is a Space Telescope Engineering Data Store, the design of which is based on current Data Warehouse technology. The purpose of this data store is to provide a common data source of telemetry data for all HST subsystems. This data store will become the engineering data archive and will include a queryable database for the user to analyze HST telemetry. The access to the engineering data in the Data Warehouse is platform- independent from an office environment using commercial standards. Latest internet technology is used to reach the HST engineering community. A WEB-based user interface allows easy access to the data archives. This paper will provide a high level overview of the CCS system and will illustrate some of the CCS telemetry capabilities. Samples of CCS user interface pages will be given. Vision 2000 is an ambitious project, but one that is well under way. It will allow the HST program to realize reduced operations costs for the Third Servicing Mission and beyond.
NASA's Next Generation Launch Technology Program - Strategy and Plans
NASA Technical Reports Server (NTRS)
Hueter, Uwe
2003-01-01
The National Aeronautics and Space Administration established a new program office, Next Generation Launch Technology (NGLT) Program Office, last year to pursue technologies for future space launch systems. NGLT will fund research in key technology areas such as propulsion, launch vehicles, operations and system analyses. NGLT is part of NASA s Integrated Space Technology Plan. The NGLT Program is sponsored by NASA s Office of Aerospace Technology and is part of the Space Launch Initiative theme that includes both NGLT and Orbital Space Plane. NGLT will focus on technology development to increase safety and reliability and reduce overall costs associated with building, flying and maintaining the nation s next-generations of space launch vehicles. These investments will be guided by systems engineering and analysis with a focus on the needs of National customers.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-03
...: Terry Fahr, Aerospace Engineer, Boston Aircraft Certification Office, FAA, Engine and Propeller... Office, FAA, Engine and Propeller Directorate, has the authority to approve AMOCs for this AD, if..., Aerospace Engineer, Boston Aircraft Certification Office, FAA, Engine and Propeller Directorate, 12 New...
46 CFR 11.530 - Endorsements for engineers of uninspected fishing industry vessels.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 1 2013-10-01 2013-10-01 false Endorsements for engineers of uninspected fishing... MARINE OFFICERS AND SEAMEN REQUIREMENTS FOR OFFICER ENDORSEMENTS Professional Requirements for Engineer Officer § 11.530 Endorsements for engineers of uninspected fishing industry vessels. (a) This section...
46 CFR 11.530 - Endorsements for engineers of uninspected fishing industry vessels.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 1 2012-10-01 2012-10-01 false Endorsements for engineers of uninspected fishing... MARINE OFFICERS AND SEAMEN REQUIREMENTS FOR OFFICER ENDORSEMENTS Professional Requirements for Engineer Officer § 11.530 Endorsements for engineers of uninspected fishing industry vessels. (a) This section...
46 CFR 11.530 - Endorsements for engineers of uninspected fishing industry vessels.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 1 2011-10-01 2011-10-01 false Endorsements for engineers of uninspected fishing... MARINE OFFICERS AND SEAMEN REQUIREMENTS FOR OFFICER ENDORSEMENTS Professional Requirements for Engineer Officer § 11.530 Endorsements for engineers of uninspected fishing industry vessels. (a) This section...
Naval Postgraduate School Research. Volume 14, Number 1, February 2004
2004-02-01
PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES...this review were to ensure officers continue to receive high quality, relevant, and responsive graduate education aligned to defense needs...Initiative (COSSI), Earned Value Management System (EVMS), Activity-Based Costing (ABC), Value Engineering, and lessons from R-TOC Pilots. Sponsored
NASA Astrophysics Data System (ADS)
1981-01-01
Oklahoma City Police Department developed a computerized communications system, based on Johnson Space Center's (JSC's) 1960-mission control knowledge. JSC furnished information on lighting and other fatigue reducing measures, and provided specifications for equipment and design layouts. JSC also advised OCPD how to avoid communications bottlenecks associated with simultaneous handling of telephone, radio and inner-office transmissions. Oklahoma City saved money in reduced design and engineering costs by utilizing the already developed NASA technology.
2003-07-01
standard release with the publicly available "mod" interface allows us to avoid purchasing a game engine license (approximate cost $350,000) from Epic...depletion is accurately simulated for ammunition * Both contain target detection, target identification, target selection, and collision avoidance and...into other game genres such as Real-Time Strategy (RTS) games and Massively Multiplayer Online Role- Playing Games ( MMORPG ). Unfortunately these game
46 CFR 11.504 - Application of deck service for limited engineer endorsements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 1 2011-10-01 2011-10-01 false Application of deck service for limited engineer... OFFICERS AND SEAMEN REQUIREMENTS FOR OFFICER ENDORSEMENTS Professional Requirements for Engineer Officer § 11.504 Application of deck service for limited engineer endorsements. Service gained in the deck...
46 CFR 11.504 - Application of deck service for limited engineer endorsements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 1 2012-10-01 2012-10-01 false Application of deck service for limited engineer... OFFICERS AND SEAMEN REQUIREMENTS FOR OFFICER ENDORSEMENTS Professional Requirements for Engineer Officer § 11.504 Application of deck service for limited engineer endorsements. Service gained in the deck...
46 CFR 11.504 - Application of deck service for limited engineer endorsements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 1 2013-10-01 2013-10-01 false Application of deck service for limited engineer... OFFICERS AND SEAMEN REQUIREMENTS FOR OFFICER ENDORSEMENTS Professional Requirements for Engineer Officer § 11.504 Application of deck service for limited engineer endorsements. Service gained in the deck...
Code of Federal Regulations, 2014 CFR
2014-10-01
... Officer in Charge of an Engineering Watch (OICEW) in a manned engineroom or designated duty engineer in a... Endorsements § 11.329 Requirements to qualify for an STCW endorsement as Officer in Charge of an Engineering... rescue boats other than fast rescue boats. (iv) Engineroom resource management (ERM). (v) Engineering...
Engineering a responsive, low cost, tactical satellite, TACSAT-1
NASA Astrophysics Data System (ADS)
Hurley, M.; Duffey, T.; Huffine, Christopher; Weldy, Ken; Clevland, Jeff; Hauser, Joe
2004-11-01
The Secretary of Defense's Office of Force Transformation (OFT) is currently undertaking an initiative to develop a low-cost, responsive, operationally relevant space capability using small satellites. The Naval Research Laboratory (NRL) is tasked to be program manger for this initiative, which seeks to make space assets and capabilities available to operational users. TacSat-1 is the first in a series of small satellites that will result in rapid, tailored, and operationally relevant experimental space capabilities for tactical forces. Components of the resulting tactical architecture include a highly automated small satellite bus, modular payloads, common launch and payload interfaces, tasking and data dissemination using the SIPRNET (Secret Internet Protocol Routing Network), and low cost, rapid response launches. The overall goal of TacSat-1 is to demonstrate the utility of a broader complementary business model and provide a catalyst for energizing DoD and industry in the operational space area. This paper first provides a brief overview of the TacSat- 1 experiment and then discusses the engineering designs and practices used to achieve the aggressive cost and schedule goals. Non-standard approaches and engineering philosophies that allowed the TacSat-1 spacecraft to be finished in twelve months are detailed and compared with "normal" satellite programs where applicable. Specific subsystem design, integration and test techniques, which contributed to the successful completion of the TacSat-1 spacecraft, are reviewed. Finally, lessons learned are discussed.
Alternatives Analysis Amchitka Island Mud Pit Cap Repair, Amchitka, Alaska January 2016
DOE Office of Scientific and Technical Information (OSTI.GOV)
Darr, Paul S.
2016-01-01
The U.S. Department of Energy (DOE) Office of Legacy Management (LM) manages the Nevada Offsites program, which includes a series of reclaimed drilling mud impoundments on Amchitka Island, Alaska (Figure 1). Navarro Research and Engineering, Inc. is the Legacy Management Support contractor (the Contractor) for LM. The Contractor has procured Tetra Tech, Inc. to provide engineering support to the Amchitka mud pit reclamation project. The mud pit caps were damaged during a 7.9-magnitude earthquake that occurred in 2014. The goals of the current project are to investigate conditions at the mud pit impoundments, identify feasible alternatives for repair of themore » cover systems and the contents, and estimate relative costs of repair alternatives. This report presents descriptions of the sites and past investigations, existing conditions, summaries of various repair/mitigation alternatives, and direct, unburdened, order-of-magnitude (-15% to +50%) associated costs.« less
Simulation software: engineer processes before reengineering.
Lepley, C J
2001-01-01
People make decisions all the time using intuition. But what happens when you are asked: "Are you sure your predictions are accurate? How much will a mistake cost? What are the risks associated with this change?" Once a new process is engineered, it is difficult to analyze what would have been different if other options had been chosen. Simulating a process can help senior clinical officers solve complex patient flow problems and avoid wasted efforts. Simulation software can give you the data you need to make decisions. The author introduces concepts, methodologies, and applications of computer aided simulation to illustrate their use in making decisions to improve workflow design.
Rydstedt, Leif W; Lundh, Monica
2010-01-01
The first purpose of this study was to compare the psychosocial working conditions and mental health of our sample of maritime engine officers with a sample of British shore-based professional engineers. The second purpose was to analyse the relationship between the psychosocial working conditions onboard and mental strain for the Swedish maritime engine officers. There were a total of 731 engine officers in the Swedish merchant fleet, almost all males with higher education. The British comparison sample consisted of 312 professional shore-based engineers. A questionnaire was distributed to the Swedish engine officers with a modified version of the JCQ for the DC-S model, the Role conflict and Ambiguity scale, and two items on family-work inter-role conflicts (WFI/FWI), as workload indicators. The General Health Questionnaire (GHQ12) and Perceived Stress Scale (PSS10) were used as strain indicators. There were no significant differences in perceived job stain or in WFI/FWI between the Swedish engine officers and the British professional engineers in perceived job strain. While the British shore-based engineers reported significantly higher role ambiguity the Swedish engine officers perceived a significantly higher degree of role conflict and higher perceived stress. Hierarchic linear regression analysis showed that the Role Stress was strongly related to perceived stress (R(2) = 0.319) as well as to mental health (R(2) = 0.222). When introduced in the second step the DC-S model was significantly related to the outcome measures, as was WFI/FWI when finally introduced. The main source of the high degree of perceived stress among the engine officers does not seem to be the job content but may rather be understood from an interactional perspective, where conflicting requirements are directed towards the individual officer. It can be assumed that the fast technological and organizational changes and the increased pressure for economic profitability that characterize the shipping industry have attenuated these role conflicts.
Orbit transfer rocket engine technology program: Automated preflight methods concept definition
NASA Technical Reports Server (NTRS)
Erickson, C. M.; Hertzberg, D. W.
1991-01-01
The possibility of automating preflight engine checkouts on orbit transfer engines is discussed. The minimum requirements in terms of information and processing necessary to assess the engine'e integrity and readiness to perform its mission were first defined. A variety of ways for remotely obtaining that information were generated. The sophistication of these approaches varied from a simple preliminary power up, where the engine is fired up for the first time, to the most advanced approach where the sensor and operational history data system alone indicates engine integrity. The critical issues and benefits of these methods were identified, outlined, and prioritized. The technology readiness of each of these automated preflight methods were then rated on a NASA Office of Exploration scale used for comparing technology options for future mission choices. Finally, estimates were made of the remaining cost to advance the technology for each method to a level where the system validation models have been demonstrated in a simulated environment.
Photographic copy of floor plan, undated, Civil Engineers Office, in ...
Photographic copy of floor plan, undated, Civil Engineers Office, in possession of Selfridge Base Civil Engineers Office, Mt. Clemens, Michigan - Selfridge Field, Building No. 833, West of Mulberry Street north of George Avenue, Mount Clemens, Macomb County, MI
NASA Handbook for Spacecraft Structural Dynamics Testing
NASA Technical Reports Server (NTRS)
Kern, Dennis L.; Scharton, Terry D.
2005-01-01
Recent advances in the area of structural dynamics and vibrations, in both methodology and capability, have the potential to make spacecraft system testing more effective from technical, cost, schedule, and hardware safety points of view. However, application of these advanced test methods varies widely among the NASA Centers and their contractors. Identification and refinement of the best of these test methodologies and implementation approaches has been an objective of efforts by the Jet Propulsion Laboratory on behalf of the NASA Office of the Chief Engineer. But to develop the most appropriate overall test program for a flight project from the selection of advanced methodologies, as well as conventional test methods, spacecraft project managers and their technical staffs will need overall guidance and technical rationale. Thus, the Chief Engineer's Office has recently tasked JPL to prepare a NASA Handbook for Spacecraft Structural Dynamics Testing. An outline of the proposed handbook, with a synopsis of each section, has been developed and is presented herein. Comments on the proposed handbook are solicited from the spacecraft structural dynamics testing community.
NASA Handbook for Spacecraft Structural Dynamics Testing
NASA Technical Reports Server (NTRS)
Kern, Dennis L.; Scharton, Terry D.
2004-01-01
Recent advances in the area of structural dynamics and vibrations, in both methodology and capability, have the potential to make spacecraft system testing more effective from technical, cost, schedule, and hardware safety points of view. However, application of these advanced test methods varies widely among the NASA Centers and their contractors. Identification and refinement of the best of these test methodologies and implementation approaches has been an objective of efforts by the Jet Propulsion Laboratory on behalf of the NASA Office of the Chief Engineer. But to develop the most appropriate overall test program for a flight project from the selection of advanced methodologies, as well as conventional test methods, spacecraft project managers and their technical staffs will need overall guidance and technical rationale. Thus, the Chief Engineer's Office has recently tasked JPL to prepare a NASA Handbook for Spacecraft Structural Dynamics Testing. An outline of the proposed handbook, with a synopsis of each section, has been developed and is presented herein. Comments on the proposed handbook is solicited from the spacecraft structural dynamics testing community.
NASA Astrophysics Data System (ADS)
Bando, Shigeru; Watanabe, Hiroki; Asano, Hiroshi; Tsujita, Shinsuke
A methodology was developed to design the number and capacity for each piece of equipment (e.g. gas engines, batteries, thermal storage tanks) in microgrids with combined heat and power systems. We analyzed three types of microgrids; the first one consists of an office building and an apartment, the second one consists of a hospital and an apartment, the third one consists of a hotel, office and retails. In the methodology, annual cost is minimized by considering the partial load efficiency of a gas engine and its scale economy, and the optimal number and capacity of each piece of equipment and the annual operational schedule are determined by using the optimal planning method. Based on calculations using this design methodology, it is found that the optimal number of gas engines is determined by the ratio of bottom to peak of the electricity demand and the ratio of heat to electricity demand. The optimal capacity of a battery required to supply electricity for a limited time during a peak demand period is auxiliary. The thermal storage tank for space cooling and space heating is selected to minimize the use of auxiliary equipment such as a gas absorption chiller.
Space system production cost benefits from contemporary philosophies in management and manufacturing
NASA Technical Reports Server (NTRS)
Rosmait, Russell L.
1991-01-01
The cost of manufacturing space system hardware has always been expensive. The Engineering Cost Group of the Program Planning office at Marshall is attempting to account for cost savings that result from new technologies in manufacturing and management. The objective is to identify and define contemporary philosophies in manufacturing and management. The seven broad categories that make up the areas where technological advances can assist in reducing space system costs are illustrated. Included within these broad categories is a list of the processes or techniques that specifically provide the cost savings within todays design, test, production and operations environments. The processes and techniques listed achieve savings in the following manner: increased productivity; reduced down time; reduced scrap; reduced rework; reduced man hours; and reduced material costs. In addition, it should be noted that cost savings from production and processing improvements effect 20 to 40 pct. of production costs whereas savings from management improvements effects 60 to 80 of production cost. This is important because most efforts in reducing costs are spent trying to reduce cost in the production.
78 FR 9005 - Airworthiness Directives; Dowty Propellers Propellers
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-07
... the FAA, Engine & Propeller Directorate, 12 New England Executive Park, Burlington, MA. For..., Aerospace Engineer, Boston Aircraft Certification Office, FAA, Engine and Propeller Directorate, 12 New... Engineer, Boston Aircraft Certification Office, FAA, Engine and Propeller Directorate, 12 New England...
46 CFR 10.109 - Classification of endorsements.
Code of Federal Regulations, 2010 CFR
2010-10-01
...) Machinist; (viii) Pumpman; (ix) Deck engine mechanic; and (x) Engineman. (4) Lifeboatman. (5) Wiper. (6...). (4) Chief engineer. (5) Second engineer officer. (6) Officer in charge of an engineering watch in a...
78 FR 41283 - Airworthiness Directives; Dowty Propellers Propellers
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-10
... service information at the FAA, Engine & Propeller Directorate, 12 New England Executive Park, Burlington... Engineer, Boston Aircraft Certification Office, FAA, Engine and Propeller Directorate, 12 New England... Engineer, Boston Aircraft Certification Office, FAA, Engine and Propeller Directorate, 12 New England...
46 CFR 11.101 - Purpose of regulations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... officer, second engineer officer (first assistant engineer), officer in charge of an engineering watch... C of this part prescribe the requirements applicable to— (1) Each approved training course, if the training course is to be acceptable as a partial substitute for service or for a required examination, or...
Indian Health Service: Community Health
... Community Health Representatives (CHRs) Office of Environmental Health & Engineering (OEHE) Environmental Health Support Center Training (EHSCT) IHS ... Contracting Tribes - 08E17 Office of Environmental Health and Engineering - 10N14C Office of Finance and Accounting - 10E54 Office ...
NASA Technical Reports Server (NTRS)
Borowski, S.; Clark, J.; Sefcik, R.; Corban, R.; Alexander, S.
1995-01-01
The results of integrated systems and mission studies are presented which quantify the benefits and rationale for developing a common, modular lunar/Mars space transportation system (STS) based on nuclear thermal rocket (NTR) technology. At present NASA's Exploration Program Office (ExPO) is considering chemical propulsion for an 'early return to the Moon' and NTR propulsion for the more demanding Mars missions to follow. The time and cost to develop these multiple systems are expected to be significant. The Nuclear Propulsion Office (NPO) has examined a variety of lunar and Mars missions and heavy lift launch vehicle (HLLV) options in an effort to determine a 'standardized' set of engine and stage components capable of satisfying a wide range of Space Exploration Initiative (SEI) missions. By using these components in a 'building block' fashion, a variety of single and multi-engine lunar and Mars vehicles can be configured. For NASA's 'First Lunar Outpost' (FLO) mission, an expendable NTR stage powered by two 50 klbf engines can deliver approximately 96 metric tons (t) to translunar injection (TLI) conditions for an initial mass in low earth orbit (IMLEO) of approximately 198 t compared to 250 t for a cryogenic chemical TLI stage. The NTR stage liquid hydrogen (LH2) tank has a 10 m diameter, 14.5 m length, and 66 t LH2 capacity. The NTR utilizes a UC-ZrC-graphite 'composite' fuel with a specific impulse (Isp) capability of approximately 900 s and an engine thrust-to-weight ratio of approximately 4.3. By extending the size and LH2 capacity of the lunar NTR stage to approximately 20 m and 96 t, respectively, a single launch Mars cargo vehicle capable of delivering approximately 50 t of surface payload is possible. Three 50 klbf NTR engines and the two standardized LH2 tank sizes developed for lunar and Mars cargo vehicle applications would be used to configure the Mars piloted vehicle for a mission as early as 2010. The paper describes the features of the 'common' NTR-based moon/Mars STS, examines performance sensitivities resulting from different 'mission mode' assumptions, and quantifies potential schedule and cost benefits resulting from this modular moon/Mars NTR vehicle approach.
47 CFR 5.55 - Filing of applications.
Code of Federal Regulations, 2010 CFR
2010-10-01
... the Office of Engineering and Technology Web site https://gullfoss2.fcc.gov/prod/oet/cf/els/index.cfm... Office of Engineering and Technology Web site https://gullfoss2.fcc.gov/prod/oet/cf/els/index.cfm... instead be submitted to the Commission's Office of Engineering and Technology, Washington, DC 20554...
75 FR 73083 - Sunshine Act Meeting; Open Commission Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-29
... Street, SW., Washington, DC. Item No. Bureau Subject 1 OFFICE OF ENGINEERING AND TITLE: Innovation in the... sharing and generating increased value within the VHF band. 2 OFFICE OF ENGINEERING AND TITLE: Promoting... Regulations--Part 2 Administered by the Office of Engineering and Technology (OET) (ET Docket No. 06-105...
47 CFR 5.55 - Filing of applications.
Code of Federal Regulations, 2011 CFR
2011-10-01
... the Office of Engineering and Technology Web site https://gullfoss2.fcc.gov/prod/oet/cf/els/index.cfm... Office of Engineering and Technology Web site https://gullfoss2.fcc.gov/prod/oet/cf/els/index.cfm... instead be submitted to the Commission's Office of Engineering and Technology, Washington, DC 20554...
47 CFR 5.55 - Filing of applications.
Code of Federal Regulations, 2012 CFR
2012-10-01
... the Office of Engineering and Technology Web site https://gullfoss2.fcc.gov/prod/oet/cf/els/index.cfm... Office of Engineering and Technology Web site https://gullfoss2.fcc.gov/prod/oet/cf/els/index.cfm... instead be submitted to the Commission's Office of Engineering and Technology, Washington, DC 20554...
46 CFR 11.502 - Additional requirements for engineer endorsements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 1 2013-10-01 2013-10-01 false Additional requirements for engineer endorsements. 11... SEAMEN REQUIREMENTS FOR OFFICER ENDORSEMENTS Professional Requirements for Engineer Officer § 11.502 Additional requirements for engineer endorsements. (a) For all original and raise of grade of engineer...
46 CFR 11.502 - Additional requirements for engineer endorsements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 1 2010-10-01 2010-10-01 false Additional requirements for engineer endorsements. 11... SEAMEN REQUIREMENTS FOR OFFICER ENDORSEMENTS Professional Requirements for Engineer Officer § 11.502 Additional requirements for engineer endorsements. (a) For all original and raise of grade of engineer...
46 CFR 11.502 - Additional requirements for engineer endorsements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 1 2012-10-01 2012-10-01 false Additional requirements for engineer endorsements. 11... SEAMEN REQUIREMENTS FOR OFFICER ENDORSEMENTS Professional Requirements for Engineer Officer § 11.502 Additional requirements for engineer endorsements. (a) For all original and raise of grade of engineer...
46 CFR 11.502 - Additional requirements for engineer endorsements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 1 2011-10-01 2011-10-01 false Additional requirements for engineer endorsements. 11... SEAMEN REQUIREMENTS FOR OFFICER ENDORSEMENTS Professional Requirements for Engineer Officer § 11.502 Additional requirements for engineer endorsements. (a) For all original and raise of grade of engineer...
1982-03-19
high first and annually recurring costs of flue gas desulfurization . If our future coal systems have the technical flexibility to use these fuels...Democracy Lane Program Element: 64708F Fairfax, Virginia 22030 JON: 20545017 I. CONTROLLING OFFICE NAME AND ADDRESS 12. REPORT DATE Air Force Engineering...plants that supply both heating and process energy to large military installations, the majority of which are natural gas - and/or oil-fired. The goal is
The Eichleay Formula in Naval Facilities Engineering Command (NAVFACENGCOM) Contracting
1994-07-01
GS-12 ranks. The project managers, the target audience of this report, are typically junior officers, ensign to lieutenant, with limited experience in...determining the amount of additional overhead to be paid. Further, Eurostyle apparently did not experience any suspension or slowdown of work in connection of... dodo smoms (0) te cu=Mululv dofs (2) Produces mubstantially the some results as treafti an aym* odee~idcam ba ot POLor OMQthe dt. do cost a adirect
2002 Computing and Interdisciplinary Systems Office Review and Planning Meeting
NASA Technical Reports Server (NTRS)
Lytle, John; Follen, Gregory; Lopez, Isaac; Veres, Joseph; Lavelle, Thomas; Sehra, Arun; Freeh, Josh; Hah, Chunill
2003-01-01
The technologies necessary to enable detailed numerical simulations of complete propulsion systems are being developed at the NASA Glenn Research Center in cooperation with NASA Glenn s Propulsion program, NASA Ames, industry, academia and other government agencies. Large scale, detailed simulations will be of great value to the nation because they eliminate some of the costly testing required to develop and certify advanced propulsion systems. In addition, time and cost savings will be achieved by enabling design details to be evaluated early in the development process before a commitment is made to a specific design. This year s review meeting describes the current status of the NPSS and the Object Oriented Development Kit with specific emphasis on the progress made over the past year on air breathing propulsion applications for aeronautics and space transportation applications. Major accomplishments include the first 3-D simulation of the primary flow path of a large turbofan engine in less than 15 hours, and the formal release of the NPSS Version 1.5 that includes elements of rocket engine systems and a visual based syntax layer. NPSS and the Development Kit are managed by the Computing and Interdisciplinary Systems Office (CISO) at the NASA Glenn Research Center and financially supported in fiscal year 2002 by the Computing, Networking and Information Systems (CNIS) project managed at NASA Ames, the Glenn Aerospace Propulsion and Power Program and the Advanced Space Transportation Program.
46 CFR 11.501 - Grade and type of engineer endorsements issued.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 1 2012-10-01 2012-10-01 false Grade and type of engineer endorsements issued. 11.501... REQUIREMENTS FOR OFFICER ENDORSEMENTS Professional Requirements for Engineer Officer § 11.501 Grade and type of engineer endorsements issued. (a) Engineer endorsements are issued in the grades of: (1) Chief engineer; (2...
46 CFR 11.501 - Grade and type of engineer endorsements issued.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 1 2013-10-01 2013-10-01 false Grade and type of engineer endorsements issued. 11.501... REQUIREMENTS FOR OFFICER ENDORSEMENTS Professional Requirements for Engineer Officer § 11.501 Grade and type of engineer endorsements issued. (a) Engineer endorsements are issued in the grades of: (1) Chief engineer; (2...
46 CFR 11.501 - Grade and type of engineer endorsements issued.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 1 2010-10-01 2010-10-01 false Grade and type of engineer endorsements issued. 11.501... REQUIREMENTS FOR OFFICER ENDORSEMENTS Professional Requirements for Engineer Officer § 11.501 Grade and type of engineer endorsements issued. (a) Engineer endorsements are issued in the grades of: (1) Chief engineer; (2...
46 CFR 11.501 - Grade and type of engineer endorsements issued.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 1 2011-10-01 2011-10-01 false Grade and type of engineer endorsements issued. 11.501... REQUIREMENTS FOR OFFICER ENDORSEMENTS Professional Requirements for Engineer Officer § 11.501 Grade and type of engineer endorsements issued. (a) Engineer endorsements are issued in the grades of: (1) Chief engineer; (2...
46 CFR 11.544 - Endorsement as assistant engineer (MODU).
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 1 2014-10-01 2014-10-01 false Endorsement as assistant engineer (MODU). 11.544 Section... REQUIREMENTS FOR OFFICER ENDORSEMENTS Professional Requirements for National Engineer Officer Endorsements § 11.544 Endorsement as assistant engineer (MODU). (a) To qualify for an endorsement as assistant engineer...
46 CFR 11.901 - General provisions.
Code of Federal Regulations, 2012 CFR
2012-10-01
... propulsion machinery of 3,000 kW [4,000 hp] of propulsion power or more. (v) Chief engineer officer of a... propulsion power. (vi) Second engineer officer of a seagoing vessel driven by main propulsion machinery of...) Chief engineer officer of a seagoing vessel driven by main propulsion machinery of 3,000 kW [4,000 hp...
46 CFR 11.901 - General provisions.
Code of Federal Regulations, 2013 CFR
2013-10-01
... propulsion machinery of 3,000 kW [4,000 hp] of propulsion power or more. (v) Chief engineer officer of a... propulsion power. (vi) Second engineer officer of a seagoing vessel driven by main propulsion machinery of...) Chief engineer officer of a seagoing vessel driven by main propulsion machinery of 3,000 kW [4,000 hp...
46 CFR 11.901 - General provisions.
Code of Federal Regulations, 2011 CFR
2011-10-01
... propulsion machinery of 3,000 kW [4,000 hp] of propulsion power or more. (v) Chief engineer officer of a... propulsion power. (vi) Second engineer officer of a seagoing vessel driven by main propulsion machinery of...) Chief engineer officer of a seagoing vessel driven by main propulsion machinery of 3,000 kW [4,000 hp...
Cost and Schedule Analytical Techniques Development
NASA Technical Reports Server (NTRS)
1998-01-01
This Final Report summarizes the activities performed by Science Applications International Corporation (SAIC) under contract NAS 8-40431 "Cost and Schedule Analytical Techniques Development Contract" (CSATD) during Option Year 3 (December 1, 1997 through November 30, 1998). This Final Report is in compliance with Paragraph 5 of Section F of the contract. This CSATD contract provides technical products and deliverables in the form of parametric models, databases, methodologies, studies, and analyses to the NASA Marshall Space Flight Center's (MSFC) Engineering Cost Office (PP03) and the Program Plans and Requirements Office (PP02) and other user organizations. Detailed Monthly Reports were submitted to MSFC in accordance with the contract's Statement of Work, Section IV "Reporting and Documentation". These reports spelled out each month's specific work performed, deliverables submitted, major meetings conducted, and other pertinent information. Therefore, this Final Report will summarize these activities at a higher level. During this contract Option Year, SAIC expended 25,745 hours in the performance of tasks called out in the Statement of Work. This represents approximately 14 full-time EPs. Included are the Huntsville-based team, plus SAIC specialists in San Diego, Ames Research Center, Tampa, and Colorado Springs performing specific tasks for which they are uniquely qualified.
46 CFR 11.544 - Endorsement as assistant engineer (MODU).
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 1 2012-10-01 2012-10-01 false Endorsement as assistant engineer (MODU). 11.544 Section... REQUIREMENTS FOR OFFICER ENDORSEMENTS Professional Requirements for Engineer Officer § 11.544 Endorsement as assistant engineer (MODU). To qualify for an endorsement as assistant engineer (MODU) an applicant must: (a...
46 CFR 11.544 - Endorsement as assistant engineer (MODU).
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 1 2013-10-01 2013-10-01 false Endorsement as assistant engineer (MODU). 11.544 Section... REQUIREMENTS FOR OFFICER ENDORSEMENTS Professional Requirements for Engineer Officer § 11.544 Endorsement as assistant engineer (MODU). To qualify for an endorsement as assistant engineer (MODU) an applicant must: (a...
46 CFR 11.544 - Endorsement as assistant engineer (MODU).
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 1 2011-10-01 2011-10-01 false Endorsement as assistant engineer (MODU). 11.544 Section... REQUIREMENTS FOR OFFICER ENDORSEMENTS Professional Requirements for Engineer Officer § 11.544 Endorsement as assistant engineer (MODU). To qualify for an endorsement as assistant engineer (MODU) an applicant must: (a...
46 CFR 11.553 - Chief Engineer (OSV).
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 1 2011-10-01 2011-10-01 false Chief Engineer (OSV). 11.553 Section 11.553 Shipping... OFFICER ENDORSEMENTS Professional Requirements for Engineer Officer § 11.553 Chief Engineer (OSV). (a) Except as provided by paragraph (b) of this section, to qualify for an endorsement as Chief engineer (OSV...
46 CFR 11.553 - Chief Engineer (OSV).
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 1 2013-10-01 2013-10-01 false Chief Engineer (OSV). 11.553 Section 11.553 Shipping... OFFICER ENDORSEMENTS Professional Requirements for Engineer Officer § 11.553 Chief Engineer (OSV). (a) Except as provided by paragraph (b) of this section, to qualify for an endorsement as Chief engineer (OSV...
46 CFR 11.542 - Endorsement as chief engineer (MODU).
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 1 2012-10-01 2012-10-01 false Endorsement as chief engineer (MODU). 11.542 Section 11... REQUIREMENTS FOR OFFICER ENDORSEMENTS Professional Requirements for Engineer Officer § 11.542 Endorsement as chief engineer (MODU). To qualify for an endorsement as chief engineer (MODU) an applicant must: (a...
46 CFR 11.542 - Endorsement as chief engineer (MODU).
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 1 2011-10-01 2011-10-01 false Endorsement as chief engineer (MODU). 11.542 Section 11... REQUIREMENTS FOR OFFICER ENDORSEMENTS Professional Requirements for Engineer Officer § 11.542 Endorsement as chief engineer (MODU). To qualify for an endorsement as chief engineer (MODU) an applicant must: (a...
46 CFR 11.542 - Endorsement as chief engineer (MODU).
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 1 2010-10-01 2010-10-01 false Endorsement as chief engineer (MODU). 11.542 Section 11... REQUIREMENTS FOR OFFICER ENDORSEMENTS Professional Requirements for Engineer Officer § 11.542 Endorsement as chief engineer (MODU). To qualify for an endorsement as chief engineer (MODU) an applicant must: (a...
46 CFR 11.553 - Chief Engineer (OSV).
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 1 2012-10-01 2012-10-01 false Chief Engineer (OSV). 11.553 Section 11.553 Shipping... OFFICER ENDORSEMENTS Professional Requirements for Engineer Officer § 11.553 Chief Engineer (OSV). (a) Except as provided by paragraph (b) of this section, to qualify for an endorsement as Chief engineer (OSV...
46 CFR 11.542 - Endorsement as chief engineer (MODU).
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 1 2014-10-01 2014-10-01 false Endorsement as chief engineer (MODU). 11.542 Section 11... REQUIREMENTS FOR OFFICER ENDORSEMENTS Professional Requirements for National Engineer Officer Endorsements § 11.542 Endorsement as chief engineer (MODU). (a) To qualify for an endorsement as chief engineer (MODU...
46 CFR 11.553 - Chief Engineer (OSV).
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 1 2010-10-01 2010-10-01 false Chief Engineer (OSV). 11.553 Section 11.553 Shipping... OFFICER ENDORSEMENTS Professional Requirements for Engineer Officer § 11.553 Chief Engineer (OSV). (a) Except as provided by paragraph (b) of this section, to qualify for an endorsement as Chief engineer (OSV...
46 CFR 11.542 - Endorsement as chief engineer (MODU).
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 1 2013-10-01 2013-10-01 false Endorsement as chief engineer (MODU). 11.542 Section 11... REQUIREMENTS FOR OFFICER ENDORSEMENTS Professional Requirements for Engineer Officer § 11.542 Endorsement as chief engineer (MODU). To qualify for an endorsement as chief engineer (MODU) an applicant must: (a...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Johnson, R.D.
The purpose of the Heavy Vehicle Propulsion System Materials Program is the development of materials: ceramics, intermetallics, metal alloys, and metal and ceramic coatings, to support the dieselization of class 1-3 trucks to realize a 35% fuel-economy improvement over current gasoline-fueled trucks and to support commercialization of fuel-flexible LE-55 low-emissions, high-efficiency diesel engines for class 7-8 trucks. The Office of Transportation Technologies, Office of Heavy Vehicle Technologies (OIT OHVT) has an active program to develop the technology for advanced LE-55 diesel engines with 55% efficiency and low emissions levels of 2.0 g/bhp-h NOX and 0.05 g/bhp-h particulate. The goal ismore » also for the LE-55 engine to run on natural gas with efficiency approaching that of diesel fuel. The LE-55 program is being completed in FY 1997 and, after approximately 10 years of effort, has largely met the program goals of 55% efficiency and low emissions. However, the commercialization of the LE-55 technology requires more durable materials than those that have been used to demonstrate the goals. Heavy Vehicle Propulsion System Materials will, in concert with the heavy duty diesel engine companies, develop the durable materials required to commercialize the LE-55 technologies. OIT OHVT also recognizes a significant opportunity for reduction in petroleum consumption by dieselization of pickup trucks, vans, and sport utility vehicles. Application of the diesel engine to class 1,2, and 3 trucks is expected to yield a 35% increase in fuel economy per vehicle. The foremost barrier to diesel use in this market is emission control. Once an engine is made certifiable, subsequent challenges will be in cost; noise, vibration, and harshness (NVH); and performance. The design of advanced components for high-efficiency diesel engines has, in some cases, pushed the performance envelope for materials of construction past the point of reliable operation. Higher mechanical and tribological stresses and higher temperatures of advanced designs limit the engine designer; advanced materials allow the design of components that may operate reliably at higher stresses and temperatures, thus enabling more efficient engine designs. Advanced materials also offer the opportunity to improve the emissions, NVH, and performance of diesel engines for pickup trucks, vans, and sport utility vehicles. The principal areas of research are: (1) Cost Effective High Performance Materials and Processing; (2) Advanced Manufacturing Technology; (3)Testing and Characterization; and (4) Materials and Testing Standards.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
O'Connor, Patrick; Rugani, Kelsey; West, Anna
On behalf of the U.S. Department of Energy (DOE) Wind and Water Power Technology Office (WWPTO), Oak Ridge National Laboratory (ORNL), hosted a day and half long workshop on November 5 and 6, 2015 in the Washington, D.C. metro area to discuss cost reduction opportunities in the development of hydropower projects. The workshop had a further targeted focus on the costs of small, low-head1 facilities at both non-powered dams (NPDs) and along undeveloped stream reaches (also known as New Stream-Reach Development or “NSD”). Workshop participants included a cross-section of seasoned experts, including project owners and developers, engineering and construction experts,more » conventional and next-generation equipment manufacturers, and others to identify the most promising ways to reduce costs and achieve improvements for hydropower projects.« less
Retrofit photovoltaic systems for intermediate sized applications - A design and market study
NASA Astrophysics Data System (ADS)
Noel, G. T.; Hagely, J. R.
An assessment of the technical and economic feasibility of retrofitting a significant portion of the existing intermediate sector building/application inventory with photovoltaic systems is presented. The assessment includes the development of detailed engineering and architectural designs as well as cost estimates for 12 representative installations. Promising applications include retail stores, warehouses, office buildings, religious buildings, shopping centers, education buildings, hospitals, and industrial sites. A market study indicates that there is a national invetory of 1.5 to 2.0 million feasible intermediate sector applications, with the majority being in the 20 to 400 kW size range. The present cost of the major systems components and the cost of necessary building modifications are the primary current barriers to the realization of a large retrofit photovoltaic system market. The development of standardized modular system designs and installation techniques are feasible ways to minimize costs.
46 CFR 11.502 - General requirements for national engineer endorsements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 1 2014-10-01 2014-10-01 false General requirements for national engineer endorsements... AND SEAMEN REQUIREMENTS FOR OFFICER ENDORSEMENTS Professional Requirements for National Engineer Officer Endorsements § 11.502 General requirements for national engineer endorsements. (a) For all...
NASA Project Constellation Systems Engineering Approach
NASA Technical Reports Server (NTRS)
Dumbacher, Daniel L.
2005-01-01
NASA's Office of Exploration Systems (OExS) is organized to empower the Vision for Space Exploration with transportation systems that result in achievable, affordable, and sustainable human and robotic journeys to the Moon, Mars, and beyond. In the process of delivering these capabilities, the systems engineering function is key to implementing policies, managing mission requirements, and ensuring technical integration and verification of hardware and support systems in a timely, cost-effective manner. The OExS Development Programs Division includes three main areas: (1) human and robotic technology, (2) Project Prometheus for nuclear propulsion development, and (3) Constellation Systems for space transportation systems development, including a Crew Exploration Vehicle (CEV). Constellation Systems include Earth-to-orbit, in-space, and surface transportation systems; maintenance and science instrumentation; and robotic investigators and assistants. In parallel with development of the CEV, robotic explorers will serve as trailblazers to reduce the risk and costs of future human operations on the Moon, as well as missions to other destinations, including Mars. Additional information is included in the original extended abstract.
1990-12-01
Force ......,,...Human Systems Division (AFSC) .................. . . .. . . RP Pr ra -Offic (HSDIYAO) .............. ........... Brooks Air Force...intra- system piping. Six months to one year would be required to complete and integrate these components. EECA/021491/jlh 6-39 RADIAN COlVOR AT 1O IN... system capacity has been exceeded. It is a possibility that during severe storm events, the groundwater extraction wells will be shut down to avoid
Energy Storage Systems Program Report for FY99
DOE Office of Scientific and Technical Information (OSTI.GOV)
BOYES,JOHN D.
2000-06-01
Sandia National Laboratories, New Mexico, conducts the Energy Storage Systems Program, which is sponsored by the US Department of Energy's Office of Power Technologies. The goal of this program is to develop cost-effective electric energy storage systems for many high-value stationary applications in collaboration with academia and industry. Sandia National Laboratories is responsible for the engineering analyses, contracted development, and testing of energy storage components and systems. This report details the technical achievements realized during fiscal year 1999.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hahn, H.A.; Ashworth, R.L. Jr.; Phelps, R.H.
1990-01-01
Asynchronous computer conferencing (ACC) was investigated as an alternative to resident training for the Army Reserve Component (RC). Specifically, the goals were to (1) evaluate the performance and throughput of ACC as compared with traditional Resident School instruction and (2) determine the cost-effectiveness of developing and implementing ACC. Fourteen RC students took a module of the Army Engineer Officer Advanced Course (EOAC) via ACC. Course topics included Army doctrine, technical engineering subjects, leadership, and presentation skills. Resident content was adapted for presentation via ACC. The programs of instruction for ACC and the equivalent resident course were identical; only the mediamore » used for presentation were changed. Performance on tests, homework, and practical exercises; self-assessments of learning; throughput; and cost data wee the measures of interest. Comparison data were collected on RC students taking the course in residence. Results indicated that there were no performance differences between the two groups. Students taking the course via ACC perceived greater learning benefit than did students taking the course in residence. Resident throughput was superior to ACC throughput, both in terms of numbers of students completing and time to complete the course. In spite of this fact, however, ACC was more cost-effective than resident training.« less
24 CFR 1710.117 - Cost sheet, signature of Senior Executive Officer.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Cost sheet, signature of Senior... REGISTRATION Reporting Requirements § 1710.117 Cost sheet, signature of Senior Executive Officer. (a) Cost... description of our subdivision and development plans. Signature of Senior Executive Officer (2) Cost sheet...
X-43D Conceptual Design and Feasibility Study
NASA Technical Reports Server (NTRS)
Johnson, Donald B.; Robinson, Jeffrey S.
2005-01-01
NASA s Next Generation Launch Technology (NGLT) Program, in conjunction with the office of the Director of Defense Research and Engineering (DDR&E), developed an integrated hypersonic technology demonstration roadmap. This roadmap is an integral part of the National Aerospace Initiative (NAI), a multi-year, multi-agency cooperative effort to invest in and develop, among other things, hypersonic technologies. This roadmap contains key ground and flight demonstrations required along the path to developing a reusable hypersonic space access system. One of the key flight demonstrations required for systems that will operate in the high Mach number regime is the X-43D. As currently conceived, the X-43D is a Mach 15 flight test vehicle that incorporates a hydrogen-fueled scramjet engine. The purpose of the X-43D is to gather high Mach number flight environment and engine operability information which is difficult, if not impossible, to gather on the ground. During 2003, the NGLT Future Hypersonic Flight Demonstration Office initiated a feasibility study on the X-43D. The objective of the study was to develop a baseline conceptual design, assess its performance, and identify the key technical issues. The study also produced a baseline program plan, schedule, and cost, along with a list of key programmatic risks.
46 CFR 11.555 - Assistant engineer (OSV).
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 1 2014-10-01 2014-10-01 false Assistant engineer (OSV). 11.555 Section 11.555 Shipping... OFFICER ENDORSEMENTS Professional Requirements for National Engineer Officer Endorsements § 11.555 Assistant engineer (OSV). (a) The minimum service required to qualify an applicant for an endorsement as...
46 CFR 11.553 - Chief engineer (OSV).
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 1 2014-10-01 2014-10-01 false Chief engineer (OSV). 11.553 Section 11.553 Shipping... OFFICER ENDORSEMENTS Professional Requirements for National Engineer Officer Endorsements § 11.553 Chief engineer (OSV). (a) The minimum service required to qualify an applicant for an endorsement as chief...
6. ENGINE TEST CELL BUILDING INTERIOR. CENTRAL OFFICE AREA ON ...
6. ENGINE TEST CELL BUILDING INTERIOR. CENTRAL OFFICE AREA ON BASEMENT LEVEL. LOOKING WEST. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA
33 CFR 211.13 - Approval of the Office of the Chief of Engineers.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Chief of Engineers. 211.13 Section 211.13 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE REAL ESTATE ACTIVITIES OF THE CORPS OF ENGINEERS IN CONNECTION... of the Office of the Chief of Engineers. In any case in which it may be necessary or advisable in the...
48 CFR 836.602-4 - Selection authority.
Code of Federal Regulations, 2011 CFR
2011-10-01
... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 836.602-4 Selection authority. The Director, Office of Construction and Facilities Management (for Central Office contracts), the Director, Office of Construction Management (for National Cemetery Administration contracts...
48 CFR 836.602-4 - Selection authority.
Code of Federal Regulations, 2012 CFR
2012-10-01
... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 836.602-4 Selection authority. The Director, Office of Construction and Facilities Management (for Central Office contracts), the Director, Office of Construction Management (for National Cemetery Administration contracts...
48 CFR 836.602-4 - Selection authority.
Code of Federal Regulations, 2014 CFR
2014-10-01
... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 836.602-4 Selection authority. The Director, Office of Construction and Facilities Management (for Central Office contracts), the Director, Office of Construction Management (for National Cemetery Administration contracts...
48 CFR 836.602-4 - Selection authority.
Code of Federal Regulations, 2013 CFR
2013-10-01
... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 836.602-4 Selection authority. The Director, Office of Construction and Facilities Management (for Central Office contracts), the Director, Office of Construction Management (for National Cemetery Administration contracts...
48 CFR 9904.403 - Allocation of home office expenses to segments.
Code of Federal Regulations, 2010 CFR
2010-10-01
... expenses to segments. 9904.403 Section 9904.403 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.403 Allocation of home office expenses to...
Electric Propulsion Upper-Stage for Launch Vehicle Capability Enhancement
NASA Technical Reports Server (NTRS)
Kemp, Gregory E.; Dankanich, John W.; Woodcock, Gordon R.; Wingo, Dennis R.
2007-01-01
The NASA In-Space Propulsion Technology Project Office initiated a preliminary study to evaluate the performance benefits of a solar electric propulsion (SEP) upper-stage with existing and near-term small launch vehicles. The analysis included circular and elliptical Low Earth Orbit (LEO) to Geosynchronous Earth Orbit (GEO) transfers, and LEO to Low Lunar Orbit (LLO) applications. SEP subsystem options included state-of-the-art and near-term solar arrays and electric thrusters. In-depth evaluations of the Aerojet BPT-4000 Hall thruster and NEXT gridded ion engine were conducted to compare performance, cost and revenue potential. Preliminary results indicate that Hall thruster technology is favored for low-cost, low power SEP stages, while gridded-ion engines are favored for higher power SEP systems unfettered by transfer time constraints. A low-cost point design is presented that details one possible stage configuration and outlines system limitations, in particular fairing volume constraints. The results demonstrate mission enhancements to large and medium class launch vehicles, and mission enabling performance when SEP system upper stages are mounted to low-cost launchers such as the Minotaur and Falcon 1. Study results indicate the potential use of SEP upper stages to double GEO payload mass capability and to possibly enable launch on demand capability for GEO assets. Transition from government to commercial applications, with associated cost/benefit analysis, has also been assessed. The sensitivity of system performance to specific impulse, array power, thruster size, and component costs are also discussed.
Activity based costing of probation with and without substance abuse treatment: a case study.
Alemi, Farrokh; Taxman, Faye; Doyon, Victoria; Thanner, Meridith; Baghi, Heibatollah
2004-06-01
Since many offenders have drug problems, investigators have proposed that drug testing and treatment should be an integral part of probation. In 1994, the Office of National Drug Control Policy (ONDCP) funded a demonstration project designed to integrate drug treatment with traditional supervision services. As part of this demonstration a new procedure called 'seamless' probation was set up in which treatment providers were co-located with probation officers and probation officers coordinated offenders' participation in treatment. This study examines the cost of providing substance abuse treatment coordination through probation agencies. We used Activity Based Costing (ABC) to examine the cost of probation with and without treatment coordination in one probation agency. Agency budget was analyzed and allocated to various programs. A questionnaire was developed to assess probation officer's activities. The cost of coordinating treatment for one offender was calculated by dividing the total cost of the program by units of various activities done by the probation officers. Preliminary test of reliability of the instrument showed that it was accurately portraying the probation officers time allocation. Probation officers spent 6.9% of their time in seamless supervision and 83.3% time in traditional supervision (83.83%). The seamless probation officers had more group meetings and more phone contact with their offenders than traditional probation officers. The average cost per offender per day was 12 dollars for seamless probation and 7 dollars for traditional probation. This study is limited because it focuses on one agency at one point in time. Results may not be relevant to other agencies or to the same agency as it makes its operation more efficient. This study provides a method of allocating budget cost to per client costs using survey of probation officer's activities -- a tool developed in this study. Comparison of seamless and traditional supervision activities showed major differences in terms of the probation officers' activities and costs. There are significant costs associated with asking probation officers to coordinate treatment. Studies should be undertaken to examine the relative benefits that can be derived from this increased cost.
View from west to east of PAR site resident engineer's ...
View from west to east of PAR site resident engineer's office building (REOB) - Stanley R. Mickelsen Safeguard Complex, Resident Engineers Office Building, Southeast of intersection of PAR Access Road & Fourth Avenue, Nekoma, Cavalier County, ND
Advanced Space Transportation Program (ASTP)
2000-04-03
This is a computer generated image of a Shuttle launch utilizing 2nd generation Reusable Launch Vehicle (RLV) flyback boosters, a futuristic concept that is currently undergoing study by NASA's Space Launch Initiative (SLI) Propulsion Office, managed by the Marshall Space Fight Center in Huntsville, Alabama, working in conjunction with the Agency's Glenn Research Center in Cleveland, Ohio. Currently, after providing thrust to the Space Shuttle, the solid rocket boosters are parachuted into the sea and are retrieved for reuse. The SLI is considering vehicle concepts that would fly first-stage boosters back to a designated landing site after separation from the orbital vehicle. These flyback boosters would be powered by several jet engines integrated into the booster capable of providing over 100,000 pounds of thrust. The study will determine the requirements for the engines, identify risk mitigation activities, and identify costs associated with risk mitigation and jet engine development and production, as well as determine candidate jet engine options to pursue for the flyback booster.
NASA Technical Reports Server (NTRS)
Tavana, Madjid
1995-01-01
The evaluation and prioritization of Engineering Support Requests (ESR's) is a particularly difficult task at the Kennedy Space Center (KSC) -- Shuttle Project Engineering Office. This difficulty is due to the complexities inherent in the evaluation process and the lack of structured information. The evaluation process must consider a multitude of relevant pieces of information concerning Safety, Supportability, O&M Cost Savings, Process Enhancement, Reliability, and Implementation. Various analytical and normative models developed over the past have helped decision makers at KSC utilize large volumes of information in the evaluation of ESR's. The purpose of this project is to build on the existing methodologies and develop a multiple criteria decision support system that captures the decision maker's beliefs through a series of sequential, rational, and analytical processes. The model utilizes the Analytic Hierarchy Process (AHP), subjective probabilities, the entropy concept, and Maximize Agreement Heuristic (MAH) to enhance the decision maker's intuition in evaluating a set of ESR's.
Proceedings of the Department of Energy ALARA Workshop
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dionne, B.J.; Baum, J.W.
1992-01-01
The report contains summaries of papers, discussions, and operational exercises presented at the first Department of Energy ALARA Workshop held at Brookhaven National Laboratory, Upton, New York on April 21--22, 1992. The purpose of this workshop was to provide a forum for, and enhance communication among, ALARA personnel, as well as to inform DOE's field office and contractor personnel about the Office of Health's programs and expectations from the entire DOE complex efforts in the ALARA area.The two-day workshop consisted of one day dedicated to presentations on implementing various elements of a formal ALARA program at the DOE contractors' facilities,more » regulatory aspects of ALARA programs, and DOE Headquarters' ALARA expectations/initiatives. The second day was devoted to detailed discussions on ALARA improvements and problems, and operational exercises on cost-benefit analyses and on ALARA job/experiment reviews. At this workshop, 70 health physicists and radiation safety engineers from 5 DOE Headquarter Offices, 7 DOE operations/area offices, and 27 contractor facilities exchanged information, which is expected to stimulate further improvement in the DOE contractors' ALARA programs. Individual papers are indexed separately.« less
78 FR 9789 - Airworthiness Directives; Schweizer Aircraft Corporation
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-12
... Certification Office, Engine & Propeller Directorate, 1600 Stewart Ave., suite 410, Westbury, NY 11590... inspection panel kit and stabilizer mount doublers. The Type Certificate for these helicopters transferred...: Stephen Kowalski, Aviation Safety Engineer, New York Aircraft Certification Office, Engine & Propeller...
Fringe effects of value engineering. A survey prepared by the technical subcommittee, AOA special committee on value engineering for the office of the assistant secretary of defense (installations and logistics).
1993-12-01
graduate education required for Ocean Facilities Program (OFP) officers in the Civil Engineer Corps (CEC) of the United States Navy. For the purpose...determined by distributing questionnaires to all officers in the OFP. Statistical analyses of numerical data and judgmental3 analysis of professional...45 B. Ocean Facility Program Officer Graduate Education Questionnaire ....... 47 C. Summary of Questionnaire Responses
Software Assists in Responding to Anomalous Conditions
NASA Technical Reports Server (NTRS)
James, Mark; Kronbert, F.; Weiner, A.; Morgan, T.; Stroozas, B.; Girouard, F.; Hopkins, A.; Wong, L.; Kneubuhl, J.; Malina, R.
2004-01-01
Fault Induced Document Retrieval Officer (FIDO) is a computer program that reduces the need for a large and costly team of engineers and/or technicians to monitor the state of a spacecraft and associated ground systems and respond to anomalies. FIDO includes artificial-intelligence components that imitate the reasoning of human experts with reference to a knowledge base of rules that represent failure modes and to a database of engineering documentation. These components act together to give an unskilled operator instantaneous expert assistance and access to information that can enable resolution of most anomalies, without the need for highly paid experts. FIDO provides a system state summary (a configurable engineering summary) and documentation for diagnosis of a potentially failing component that might have caused a given error message or anomaly. FIDO also enables high-level browsing of documentation by use of an interface indexed to the particular error message. The collection of available documents includes information on operations and associated procedures, engineering problem reports, documentation of components, and engineering drawings. FIDO also affords a capability for combining information on the state of ground systems with detailed, hierarchically-organized, hypertext- enabled documentation.
7 CFR 2.71 - Director, Office of Risk Assessment and Cost-Benefit Analysis.
Code of Federal Regulations, 2013 CFR
2013-01-01
... Analysis. 2.71 Section 2.71 Agriculture Office of the Secretary of Agriculture DELEGATIONS OF AUTHORITY BY... Chief Economist § 2.71 Director, Office of Risk Assessment and Cost-Benefit Analysis. (a) Delegations..., Office of Risk Assessment and Cost-Benefit Analysis: (1) Responsible for assessing the risks to human...
7 CFR 2.71 - Director, Office of Risk Assessment and Cost-Benefit Analysis.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Analysis. 2.71 Section 2.71 Agriculture Office of the Secretary of Agriculture DELEGATIONS OF AUTHORITY BY... Chief Economist § 2.71 Director, Office of Risk Assessment and Cost-Benefit Analysis. (a) Delegations..., Office of Risk Assessment and Cost-Benefit Analysis: (1) Responsible for assessing the risks to human...
32 CFR 634.24 - Traffic planning and codes.
Code of Federal Regulations, 2010 CFR
2010-07-01
... enforcement officer, engineer, safety officer, and other concerned staff agencies. Highway engineering representatives from adjacent civil communities must be consulted to ensure the installation plan is compatible... and minor routes, location of traffic control devices, and conditions requiring engineering or...
Hubble Space Telescope: the new telemetry archiving system
NASA Astrophysics Data System (ADS)
Miebach, Manfred P.
2000-07-01
The Hubble Space Telescope (HST), the first of NASA's Great Observatories, was launched on April 24, 1990. The HST was designed for a minimum fifteen-year mission with on-orbit servicing by the Space Shuttle System planned at approximately three-year intervals. Major changes to the HST ground system have been implemented for the third servicing mission in December 1999. The primary objectives of the ground system re- engineering effort, a project called 'Vision 2000 Control Center System (CCS),' are to reduce both development and operating costs significantly for the remaining years of HST's lifetime. Development costs are reduced by providing a more modern hardware and software architecture and utilizing commercial off the shelf (COTS) products wherever possible. Part of CCS is a Space Telescope Engineering Data Store, the design of which is based on current Data Warehouse technology. The Data Warehouse (Red Brick), as implemented in the CCS Ground System that operates and monitors the Hubble Space Telescope, represents the first use of a commercial Data Warehouse to manage engineering data. The purpose of this data store is to provide a common data source of telemetry data for all HST subsystems. This data store will become the engineering data archive and will provide a queryable database for the user to analyze HST telemetry. The access to the engineering data in the Data Warehouse is platform-independent from an office environment using commercial standards (Unix, Windows98/NT). The latest Internet technology is used to reach the HST engineering community. A WEB-based user interface allows easy access to the data archives. This paper will provide a CCS system overview and will illustrate some of the CCS telemetry capabilities: in particular the use of the new Telemetry Archiving System. Vision 20001 is an ambitious project, but one that is well under way. It will allow the HST program to realize reduced operations costs for the Third Servicing Mission and beyond.
Cost-Benefit Analysis of the Officer Career Information and Planning System
1980-08-01
information without the use of a computer. - vii COST-BENEFIT ANALYSIS OF THE OFFICER CAREER INFOýKATTON AND PLANNING SYSTEM CONTENTS Page INTRODUCTION ...OF THE OFFICER CAREER INFORMATION AND PLANNING SYSTEM INTRODUCTION The implementation of the Officer Personnel Management System (OPMS) has...Research Report 1256 I / COST-BENEFIT ANALYSIS OF THE OFFICER CAREER INFORMATION AND PLANNING SYSTEM Roger A. Myers, Peter C. Cairo, K - Jon A
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-09
... OFFICE OF SCIENCE AND TECHNOLOGY POLICY Nanoscale Science, Engineering and Technology Subcommittee Committee on Technology, National Science and Technology Council; Public Meetings AGENCY: Executive Office of the President, Office of Science and Technology Policy. ACTION: Notice of Public Meetings. SUMMARY...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mascarin, Anthony; Hannibal, Ted; Raghunathan, Anand
2015-04-01
The U.S. Department of Energy’s Vehicle Technologies Office, Materials area commissioned a study to model and assess manufacturing economics of alternative design and production strategies for a series of lightweight vehicle concepts. The strategic targets were a 40% and a 45% mass reduction relative to a standard North American midsize passenger sedan at an effective cost of $3.42 per pound (lb) saved. The baseline vehicle was an average of several available vehicles in this class. Mass and cost breakdowns from several sources were used, including original equipment manufacturers’ (OEMs’) input through U.S. Department of Energy’s Vehicle Technologies Office programs andmore » public presentations, A2Mac1 LLC’s teardown information, Lotus Engineering Limited and FEV, Inc. breakdowns in their respective lightweighting studies, and IBIS Associates, Inc.’s decades of experience in automotive lightweighting and materials substitution analyses. Information on lightweighting strategies in this analysis came from these same sources and the ongoing U.S. Department of Energy-funded Vehma International of America, Inc. /Ford Motor Company Multi-Material Lightweight Prototype Vehicle Demonstration Project, the Aluminum Association Transportation Group, and many United States Council for Automotive Research’s/United States Automotive Materials Partnership LLC lightweight materials programs.« less
Distributed utility technology cost, performance, and environmental characteristics
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wan, Y; Adelman, S
1995-06-01
Distributed Utility (DU) is an emerging concept in which modular generation and storage technologies sited near customer loads in distribution systems and specifically targeted demand-side management programs are used to supplement conventional central station generation plants to meet customer energy service needs. Research has shown that implementation of the DU concept could provide substantial benefits to utilities. This report summarizes the cost, performance, and environmental and siting characteristics of existing and emerging modular generation and storage technologies that are applicable under the DU concept. It is intended to be a practical reference guide for utility planners and engineers seeking informationmore » on DU technology options. This work was funded by the Office of Utility Technologies of the US Department of Energy.« less
46 CFR 11.472 - Officer endorsements as barge supervisor.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., mechanic, electrician, crane operator, subsea specialist, ballast control operator or equivalent... or barge supervisor trainee; or (ii) A degree from a program in engineering or engineering technology which is accredited by the Accreditation Board for Engineering and Technology (ABET). Commanding Officer...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-22
..., it does not need to reorganize. This notice also includes a cost-benefit analysis supporting the...-benefit analysis of the effect of the plan on the office involved. The required cost-benefit analysis must... such offices, HUD/OIG nonetheless voluntarily publishes the following cost-benefit analysis of its plan...
Code of Federal Regulations, 2014 CFR
2014-10-01
... second engineer officer on vessels powered by main propulsion machinery of 750kW/1,000 HP or more and less than 3,000 kW/4,000 HP propulsion power (management level). 11.333 Section 11.333 Shipping COAST... engineer officer on vessels powered by main propulsion machinery of 750kW/1,000 HP or more and less than 3...
Code of Federal Regulations, 2014 CFR
2014-10-01
... assistant engineer of steam, motor, and/or gas turbine-propelled vessels. 11.516 Section 11.516 Shipping... OFFICER ENDORSEMENTS Professional Requirements for National Engineer Officer Endorsements § 11.516 Service requirements for national endorsement as third assistant engineer of steam, motor, and/or gas turbine-propelled...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 7 2011-10-01 2011-10-01 false Offices. 9901.303 Section 9901.303 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL... Cost Accounting Standards Board's offices are located in the New Executive Office Building, 725 17th...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-24
... OFFICE OF SCIENCE AND TECHNOLOGY POLICY Nanoscale Science, Engineering, and Technology Subcommittee; Committee on Technology, National Science and Technology Council; Notice of Public Meeting AGENCY: Executive Office of the President, Office of Science and Technology Policy. ACTION: Notice of Public Meeting...
1. Photocopy of engineering drawing (original in the Office of ...
1. Photocopy of engineering drawing (original in the Office of the Cuyahoga County Engineer)--1907 NORTH ROCKY RIVER BRIDGE--PROPOSED DESIGN--REINFORCED CONCRETE: AN ALTERNATIVE DESIGN FOR THE DETROIT AVENUE CROSSING - Rocky River Bridge, Spanning Beaver Dam River, Rocky River, Cuyahoga County, OH
Systems Engineering Analysis for Office Space Management
2017-09-01
Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork...aid in the MCDM process and support the organization making a more informed decision for office resource management . Figure 8. Functional...ENGINEERING ANALYSIS FOR OFFICE SPACE MANAGEMENT by James E. Abellana September 2017 Thesis Advisor: Diana Angelis Second Reader: Walter E. Owen
Using Project Management Systems at the Construction Field Office
1989-03-01
instrumentation 13550 transportation control instrumentation 13600 solor energy systems 13700 wind energy systems 13800 building automation systems ...Engineering Research Laboratory AD-A207 077 Using Project Management Systems at the Construction Field Office by E. William East Jeffrey G. Kirby Automated...automated systems available, engineers at the construction fieid office (or resident office) are faced with the over- whelming task of choosing which
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-25
... rule that revised Cost Accounting Standard (CAS) 412, ``Composition and Measurement of Pension Cost... Accounting Standards: Cost Accounting Standards 412 and 413--Cost Accounting Standards Pension Harmonization Rule AGENCY: Cost Accounting Standards Board, Office of Federal Procurement Policy, Office of...
6. Photographic copy of architectural elevations for Officers' Quarters "A" ...
6. Photographic copy of architectural elevations for Officers' Quarters "A" & "B": Taylor & Barnes, Architects & Engineers, 803 W. Third Street, Los Angeles California, O.C.E. Office of Civil Engineer Job No. Muroc ESA 210-48 and 210-49, Military Construction: Muroc Flight Test Base, Muroc, California, Warehouses and Additional Housing for Officers: Officers Quarters, Elevations & Details, Sheet No. 13 of 16, May 1945. Reproduced from the holdings of the National Archives, Pacific Southwest Region - Edwards Air Force Base, North Base, Officers' Quarters A, North Base Road, Boron, Kern County, CA
Assessment of solar-assisted gas-fired heat pump systems
NASA Technical Reports Server (NTRS)
Lansing, F. L.
1981-01-01
As a possible application for the Goldstone Energy Project, the performance of a 10 ton heat pump unit using a hybrid solar gas energy source was evaluated in an effort to optimize the solar collector size. The heat pump system is designed to provide all the cooling and/or heating requirements of a selected office building. The system performance is to be augmented in the heating mode by utilizing the waste heat from the power cycle. A simplified system analysis is described to assess and compute interrrelationships of the engine, heat pump, and solar and building performance parameters, and to optimize the solar concentrator/building area ratio for a minimum total system cost. In addition, four alternative heating cooling systems, commonly used for building comfort, are described; their costs are compared, and are found to be less competitive with the gas solar heat pump system at the projected solar equipment costs.
The Location of Sales Offices and the Attraction of Cities.
ERIC Educational Resources Information Center
Holmes, Thomas J.
2005-01-01
This paper examines how manufacturers locate sales offices across cities. Sales office costs are assumed to have four components: a fixed cost, a frictional cost for out-of-town sales, a cost-reducing knowledge spillover related to city size, and an idiosyncratic match quality for each firm-city pair. A simple theoretical model is developed and is…
Manage indirect practice expense the way you practice medicine: with information.
Zeller, T L; Senagore, A J; Siegel, G
1999-05-01
Surgeons are increasingly faced with the pressures of maintaining the highest quality of patient care, while at the same time maintaining financial viability. The purpose of this project was to provide a framework for analyzing practice costs for colorectal surgeons using an activity-based cost accounting model. A survey of 11 practices that were diverse in terms of geography, managed care penetration, academic vs. private practice style, and case distribution was performed. In activity-based costing the assignment of typical costs such as staff salaries are assigned to the appropriate business process. The business processes employed in this study were service patients in the office, perform in-office procedures, schedule cases in facilities, service patients in the hospital, insurance authorization, maintain medical records, billing, collections, resolve billing disputes, interaction with third parties, maintain professional education, sustain and manage the practice, maintain the facility, teaching and research, and performing drug studies. The final step is to assign the cost associated with all appropriate business processes to the appropriate cost object. The cost objects in this study were defined as a charge office visit, no-charge office visit, charge hospital visit, in-office procedures, in-facility procedures, and performing drug studies. The data were then analyzed to allow a comparison of four similar practices within the study group. The data demonstrated that the cost of seeing a charge office visit ranged from $55 to $105. Similarly, the cost of seeing a no-charge office visit during the global period ranged from $43 to $100. The study analyzed possible explanations for the wide variability in these costs. It is essential that physicians clearly understand the sources of expenses generated by the operation of their practices. A clear comprehension of costs will lead colorectal surgeons to make appropriate decisions regarding such important issues as office staffing ratios, office square footage, and instrumentation acquisitions.
Conception of a cost accounting model for doctors' offices.
Britzelmaier, Bernd; Eller, Brigitte
2004-01-01
Physicians are required, due to economical, financial, competitive, demographical and market-induced framework conditions, to pay increasing attention to the entrepreneurial administration of their offices. Because of restructuring policies throughout the public health system--on the grounds of increasing financing problems--more and better transparency of costs will be indispensable in all fields of medical activities in the future. The more cost-conscious public health insurance institutions or other public health funds will need professional cost accounting systems, which will provide, for minimum maintenance expense, standardised basis cost information as a device for decision. The conception of cost accounting for doctors' offices presented in this paper shows an integrated cost accounting approach based on activity and marginal costing philosophy. The conception presented provides a suitable basis for the development of standard software for cost accounting systems for doctors' offices.
NASA Technical Reports Server (NTRS)
Barley, Bryan; Newhouse, Marilyn; Clardy, Dennon
2011-01-01
In the design and development of complex spacecraft missions, project teams frequently assume the use of advanced technology or heritage systems to enable a mission or reduce the overall mission risk and cost. As projects proceed through the development life cycle, increasingly detailed knowledge of the advanced or heritage systems and the system environment identifies unanticipated issues that result in cost overruns or schedule impacts. The Discovery & New Frontiers (D&NF) Program Office recently studied cost overruns and schedule delays resulting from advanced technology or heritage assumptions for 6 D&NF missions. The goal was to identify the underlying causes for the overruns and delays, and to develop practical mitigations to assist the D&NF projects in identifying potential risks and controlling the associated impacts to proposed mission costs and schedules. The study found that the cost and schedule growth did not result from technical hurdles requiring significant technology development. Instead, systems engineering processes did not identify critical issues early enough in the design cycle to ensure project schedules and estimated costs address the inherent risks. In general, the overruns were traceable to: inadequate understanding of the heritage system s behavior within the proposed spacecraft design and mission environment; an insufficient level of experience with the heritage system; or an inadequate scoping of the system-wide impacts necessary to implement the heritage or advanced technology. This presentation summarizes the study s findings and offers suggestions for improving the project s ability to identify and manage the risks inherent in the technology and heritage design solution.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.420 Accounting for independent research and development costs and bid and proposal costs. ...
78 FR 24765 - Notice of Intent To Close 16 Field Offices
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-26
... in current facilities through innovative approaches to space management and alternative workplace... eliminate the cost office space leases and administrative costs, including transit, mail, copiers... is based on GSA's ability to find a replacement lessee for the office space. ii. Buyout cost...
Suggestions for Strategic Planning for the Office of Nonproliferation Research and Engineering
2002-01-01
The Office of Nonproliferation Research and Engineering, part of the recently formed National Nuclear Security Administration within the Department...of Energy, conducts wide-ranging research for diverse end users at the federal and local level. As such, the Office faces a number of challenges in...planning methods. This report grew out of support provided to an advisory committee for the Office of Nonproliferation and National Security, an
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-05
..., Aviation Safety Engineer, FAA, New York Aircraft Certification Office, Airframe and Propulsion Branch, 1600..., Aerospace Engineer, Aviation Safety Engineer, FAA, New York Aircraft Certification Office, Airframe and Propulsion Branch, 1600 Stewart Ave., suite 410, Westbury, New York 11590, telephone (516) 228-7304, fax (516...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-13
... Office is requesting public nominations for scientists and engineers to augment the SAB Scientific and... STAA Program was established in 1980 to recognize Agency scientists and engineers who published their... seeking nominations of nationally and internationally recognized scientists and engineers having...
NATIONAL SCIENCE FOUNDATION. Preliminary Observations on Indirect Costs for Research
2017-05-24
576T United States Government Accountability Office United States Government Accountability Office Highlights of GAO-17-576T, a...administration, and accounting . To be reimbursed for indirect costs, organizations must properly identify and claim reimbursement for these costs in...accordance with applicable federal guidance. The Office of Management and Budget’s (OMB) Uniform Administrative Requirements, Cost Principles , and Audit
NASA Technical Reports Server (NTRS)
Kidd, Luanne; Morris, Kenneth B.; Self, Tim
2006-01-01
The U.S. Vision for Space Exploration directs NASA to retire the Space Shuttle in 2010 and replace it with safe, reliable, and cost-effective space transportation systems for crew and cargo travel to the Moon, Mars, and beyond. Such emerging space transportation initiatives face massive organizational challenges, including building and nurturing an experienced, dedicated team with the right skills for the required tasks; allocating and tracking the fiscal capital invested in achieving technical progress against an integrated master schedule; and turning generated data into usehl knowledge that equips the team to design and develop superior products for customers and stakeholders. This paper discusses how NASA's Exploration Launch Projects Office, which is responsible for delivering these new launch vehicles, integrates these resources to create an engineering business environment that promotes mission success.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lavietes, Anthony; Trebes, James; Borchers, Robert
2013-01-01
At the request of the Domestic Nuclear Detection Office (DNDO), a Review Committee comprised of representatives from the American Physical Society (APS) Panel on Public Affairs (POPA) and the Institute of Electrical and Electronics Engineers (IEEE) Nuclear and Plasma Sciences Society (NPSS) performed a technical review of the DNDO Transformational and Applied Research Directorate (TARD) research and development program. TARD’s principal objective is to address gaps in the Global Nuclear Detection Architecture (GNDA) through improvements in the performance, cost, and operational burden of detectors and systems. The charge to the Review Committee was to investigate the existing TARD research andmore » development plan and portfolio, recommend changes to the existing plan, and recommend possible new R&D areas and opportunities. The Review Committee has several recommendations.« less
Cost Analysis of Channeled, Distal Chip Laryngoscope for In-office Laryngopharyngeal Biopsies.
Marcus, Sonya; Timen, Micah; Dion, Gregory R; Fritz, Mark A; Branski, Ryan C; Amin, Milan R
2018-02-19
Given that financial considerations play an increasingly prominent role in clinical decision-making, we sought (1) to determine the cost-effectiveness of in-office biopsy for the patient, the provider, and the health-care system, and (2) to determine the diagnostic accuracy of in-office biopsy. Retrospective, financial analyses were performed. Patients who underwent in-office (Current Procedural Terminology Code 31576) or operative biopsy (CPT Code 31535) for laryngopharyngeal lesions were included. Two financial analyses were performed: (1) the average cost of operating room (OR) versus in-office biopsy was calculated, and (2) a break-even analysis was calculated to determine the cost-effectiveness of in-office biopsy for the provider. In addition, the diagnostic accuracy of in-office biopsies and need for additional biopsies or procedures was recorded. Of the 48 patients included in the current study, 28 underwent in-office biopsy. A pathologic sample was obtained in 26 of 28 (92.9%) biopsies performed in the office. Of these patients, 16 avoided subsequent OR procedures. The average per patient cost was $7000 and $11,000 for in-office and OR biopsy, respectively. Break-even analysis demonstrated that the provider could achieve a profit 2 years after purchase of the necessary equipment. In-office laryngopharyngeal biopsies are accurate and, overall, more cost-effective than OR biopsies. Purchase of the channeled, distal chip laryngoscope and biopsy forceps to perform in-office biopsies can be profitable for a provider with a videolaryngoscopy tower. In-office biopsy should be considered the initial diagnostic tool for suspected laryngopharyngeal malignancies noted on videolaryngoscopy. Copyright © 2018 The Voice Foundation. Published by Elsevier Inc. All rights reserved.
1998-07-29
of an operating Cummins NH diesel engine . TECHNICAL DISCUSSION: The chemistry of soot formation has been the subject of extensive research for many...Army Research Office. 14. SUBJECT TERMS Flames, Propulsion, Gas Turbines, Diesel Engines , Scramjets, Soot, Sprays, Turbulence, Diagnostics 17...Menon, Y. Neumeier, J. V. R. Prasad, L. Sankar, J. Seitzman; Georgia Institute of Technology Analysis of Advanced Direct-Injection Diesel Engine
2007-06-01
single-cylinder diesel engine showed that at high EGR rates, the autoignition mechanism changes from the typical single stage to a two-stage process...2002). 3. Edwards, T., Zabarnick, S. "Supercritical Fuel Deposition Mechanisms ," Industrial and Engineering Chemistry Research 32: 3117-3122 (1993...and the Air Force Office of Scientific Research. 20070910360 15. SUBJECT TERMS Flames, Propulsion, Gas Turbines, Diesel Engines , Scramjets, Pulse
Code of Federal Regulations, 2010 CFR
2010-10-01
... Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.401 Cost... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Cost accounting standard...
68. Photocopy of drawing (from print, Burlington Northern Engineering Office) ...
68. Photocopy of drawing (from print, Burlington Northern Engineering Office) STRESS DIAGRAM - Burlington Northern Railroad Bridge, Spanning Willamette River at River Mile 6.9, Portland, Multnomah County, OR
15 CFR 1150.3 - Approved markings.
Code of Federal Regulations, 2012 CFR
2012-01-01
... Federal Standard 595a may be obtained from the Office of Engineering and Technical Management, Chemical... Standard 595a may be obtained from the Office of Engineering and Technical Management, Chemical Technology...
15 CFR 1150.3 - Approved markings.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Federal Standard 595a may be obtained from the Office of Engineering and Technical Management, Chemical... Standard 595a may be obtained from the Office of Engineering and Technical Management, Chemical Technology...
15 CFR 1150.3 - Approved markings.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Federal Standard 595a may be obtained from the Office of Engineering and Technical Management, Chemical... Standard 595a may be obtained from the Office of Engineering and Technical Management, Chemical Technology...
33 CFR 211.13 - Approval of the Office of the Chief of Engineers.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Approval of the Office of the Chief of Engineers. 211.13 Section 211.13 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE REAL ESTATE ACTIVITIES OF THE CORPS OF ENGINEERS IN CONNECTION WITH CIVIL WORKS PROJECTS Disposal of Real Estate...
5. Photographic copy of architectural floor plans for Officers' Quarters ...
5. Photographic copy of architectural floor plans for Officers' Quarters "A" & "B": Taylor & Barnes, Architects & Engineers, 803 W. Third Street, Los Angeles California, O.C.E. Office of Civil Engineer Job No. Muroc ESA 210-48 and 210-49, Military Construction: Muroc Flight Test Base, Muroc, California, Warehouses and Additional Housing for Officers: Officers Quarters, Floor Plan, Foundation Plan & Details, Sheet No. 12 of 16, May 1945. Reproduced from the holdings of the National Archives, Pacific Southwest Region - Edwards Air Force Base, North Base, Officers' Quarters A, North Base Road, Boron, Kern County, CA
Economic, Environmental and Health Implications of Enhanced Ventilation in Office Buildings.
MacNaughton, Piers; Pegues, James; Satish, Usha; Santanam, Suresh; Spengler, John; Allen, Joseph
2015-11-18
Current building ventilation standards are based on acceptable minimums. Three decades of research demonstrates the human health benefits of increased ventilation above these minimums. Recent research also shows the benefits on human decision-making performance in office workers, which translates to increased productivity. However, adoption of enhanced ventilation strategies is lagging. We sought to evaluate two of the perceived potential barriers to more widespread adoption-Economic and environmental costs. We estimated the energy consumption and associated per building occupant costs for office buildings in seven U.S. cities, representing different climate zones for three ventilation scenarios (standard practice (20 cfm/person), 30% enhanced ventilation, and 40 cfm/person) and four different heating, ventilation and air conditioning (HVAC) system strategies (Variable Air Volume (VAV) with reheat and a Fan Coil Unit (FCU), both with and without an energy recovery ventilator). We also estimated emissions of greenhouse gases associated with this increased energy usage, and, for comparison, converted this to the equivalent number of vehicles using greenhouse gas equivalencies. Lastly, we paired results from our previous research on cognitive function and ventilation with labor statistics to estimate the economic benefit of increased productivity associated with increasing ventilation rates. Doubling the ventilation rate from the American Society of Heating, Refrigeration and Air-Conditioning Engineers minimum cost less than $40 per person per year in all climate zones investigated. Using an energy recovery ventilation system significantly reduced energy costs, and in some scenarios led to a net savings. At the highest ventilation rate, adding an ERV essentially neutralized the environmental impact of enhanced ventilation (0.03 additional cars on the road per building across all cities). The same change in ventilation improved the performance of workers by 8%, equivalent to a $6500 increase in employee productivity each year. Reduced absenteeism and improved health are also seen with enhanced ventilation. The health benefits associated with enhanced ventilation rates far exceed the per-person energy costs relative to salary costs. Environmental impacts can be mitigated at regional, building, and individual-level scales through the transition to renewable energy sources, adoption of energy efficient systems and ventilation strategies, and promotion of other sustainable policies.
Economic, Environmental and Health Implications of Enhanced Ventilation in Office Buildings
MacNaughton, Piers; Pegues, James; Satish, Usha; Santanam, Suresh; Spengler, John; Allen, Joseph
2015-01-01
Introduction: Current building ventilation standards are based on acceptable minimums. Three decades of research demonstrates the human health benefits of increased ventilation above these minimums. Recent research also shows the benefits on human decision-making performance in office workers, which translates to increased productivity. However, adoption of enhanced ventilation strategies is lagging. We sought to evaluate two of the perceived potential barriers to more widespread adoption—Economic and environmental costs. Methods: We estimated the energy consumption and associated per building occupant costs for office buildings in seven U.S. cities, representing different climate zones for three ventilation scenarios (standard practice (20 cfm/person), 30% enhanced ventilation, and 40 cfm/person) and four different heating, ventilation and air conditioning (HVAC) system strategies (Variable Air Volume (VAV) with reheat and a Fan Coil Unit (FCU), both with and without an energy recovery ventilator). We also estimated emissions of greenhouse gases associated with this increased energy usage, and, for comparison, converted this to the equivalent number of vehicles using greenhouse gas equivalencies. Lastly, we paired results from our previous research on cognitive function and ventilation with labor statistics to estimate the economic benefit of increased productivity associated with increasing ventilation rates. Results: Doubling the ventilation rate from the American Society of Heating, Refrigeration and Air-Conditioning Engineers minimum cost less than $40 per person per year in all climate zones investigated. Using an energy recovery ventilation system significantly reduced energy costs, and in some scenarios led to a net savings. At the highest ventilation rate, adding an ERV essentially neutralized the environmental impact of enhanced ventilation (0.03 additional cars on the road per building across all cities). The same change in ventilation improved the performance of workers by 8%, equivalent to a $6500 increase in employee productivity each year. Reduced absenteeism and improved health are also seen with enhanced ventilation. Conclusions: The health benefits associated with enhanced ventilation rates far exceed the per-person energy costs relative to salary costs. Environmental impacts can be mitigated at regional, building, and individual-level scales through the transition to renewable energy sources, adoption of energy efficient systems and ventilation strategies, and promotion of other sustainable policies. PMID:26593933
RS-25 for the NASA Cargo Launch Vehicle: The Evolution of SSME for Space Exploration
NASA Technical Reports Server (NTRS)
Kynard, Michael H.; McArthur, J. Craig; Ise, Dayna S.
2006-01-01
A key element of the National Vision for Space Exploration is the development of a heavy-lift Cargo Launch Vehicle (CaLV). Missions to the Moon, Mars, and beyond are only possible with the logistical capacity of putting large payloads in low-earth orbit. However, beyond simple logistics, there exists the need for this capability to be as cost effective as possible to ensure mission sustainability. An element of the CaLV project is, therefore, the development of the RS-25, which represents the evolution of the proven Space Shuttle Main Engine (SSME) into a high-performance, cost-effective expendable rocket engine. The development of the RS-25 will be built upon the foundation of over one million seconds of accumulated hot-fire time on the SSME. Yet in order to transform the reusable SSME into the more cost-effective, expendable RS-25 changes will have to be made. Thus the project will inevitably strive to maintain a balance between demonstrated heritage products and processes and the utilization of newer technology developments. Towards that end, the Core Stage Engine Office has been established at the NASA Marshall Space Flight Center to initiate the design and development of the RS-25 engine. This paper is being written very early in the formulation phase of the RS-25 project. Therefore the focus of this paper will be to present the scope, challenges, and opportunities for the RS-25 project. Early schedules and development decisions and plans will be explained. For not only must the RS-25 project achieve cost effectiveness through the development of new, evolved components such as a channel-wall nozzle, a new HIP-bonded main combustion chamber, and several others, it must simultaneously develop the means whereby this engine can be manufactured on a scale never envisioned for the SSME. Thus, while the overall project will span the next eight to ten years, there is little doubt that even this schedule is aggressive with a great deal of work to accomplish.
Dynamic Gate Product and Artifact Generation from System Models
NASA Technical Reports Server (NTRS)
Jackson, Maddalena; Delp, Christopher; Bindschadler, Duane; Sarrel, Marc; Wollaeger, Ryan; Lam, Doris
2011-01-01
Model Based Systems Engineering (MBSE) is gaining acceptance as a way to formalize systems engineering practice through the use of models. The traditional method of producing and managing a plethora of disjointed documents and presentations ("Power-Point Engineering") has proven both costly and limiting as a means to manage the complex and sophisticated specifications of modern space systems. We have developed a tool and method to produce sophisticated artifacts as views and by-products of integrated models, allowing us to minimize the practice of "Power-Point Engineering" from model-based projects and demonstrate the ability of MBSE to work within and supersede traditional engineering practices. This paper describes how we have created and successfully used model-based document generation techniques to extract paper artifacts from complex SysML and UML models in support of successful project reviews. Use of formal SysML and UML models for architecture and system design enables production of review documents, textual artifacts, and analyses that are consistent with one-another and require virtually no labor-intensive maintenance across small-scale design changes and multiple authors. This effort thus enables approaches that focus more on rigorous engineering work and less on "PowerPoint engineering" and production of paper-based documents or their "office-productivity" file equivalents.
48 CFR 9904.403 - Allocation of home office expenses to segments.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 7 2012-10-01 2012-10-01 false Allocation of home office expenses to segments. 9904.403 Section 9904.403 Federal Acquisition Regulations System COST ACCOUNTING... AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.403 Allocation of home office expenses to...
64. Photocopy of drawing (from print, Burlington Northern Engineering Office, ...
64. Photocopy of drawing (from print, Burlington Northern Engineering Office, Seattle) STRESS SHEET - Burlington Northern Railroad Bridge, Spanning Willamette River at River Mile 6.9, Portland, Multnomah County, OR
2017-03-01
COSTS AND BENEFITS ASSOCIATED WITH INITIAL CONTRACTING TECHNICAL EDUCATION AND TRAINING FOR UNRESTRICTED MARINE OFFICERS by Lee A. White...WITH INITIAL CONTRACTING TECHNICAL EDUCATION AND TRAINING FOR UNRESTRICTED MARINE OFFICERS 5. FUNDING NUMBERS 6. AUTHOR(S) Lee A. White 7. PERFORMING...unlimited. AN ANALYSIS OF COSTS AND BENEFITS ASSOCIATED WITH INITIAL CONTRACTING TECHNICAL EDUCATION AND TRAINING FOR UNRESTRICTED MARINE OFFICERS
Code of Federal Regulations, 2010 CFR
2010-10-01
... for the measurement of insurance costs, the assignment of such costs to cost accounting periods, and... Section 9904.416-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING...
Code of Federal Regulations, 2010 CFR
2010-10-01
... measurement and assignment of costs to cost objectives. (b) This Cost Accounting Standard does not cover... Section 9904.411-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING...
76 FR 53378 - Cost Accounting Standards: Accounting for Insurance Costs
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-26
... Accounting Standards: Accounting for Insurance Costs AGENCY: Cost Accounting Standards Board (Board), Office... Discontinuation of Rulemaking. SUMMARY: The Office of Federal Procurement Policy (OFPP), Cost Accounting Standards... development of an amendment to Cost Accounting Standard (CAS) 416 regarding the use of the term ``catastrophic...
Proceedings of the Department of Energy ALARA Workshop
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dionne, B.J.; Baum, J.W.
1992-12-31
The report contains summaries of papers, discussions, and operational exercises presented at the first Department of Energy ALARA Workshop held at Brookhaven National Laboratory, Upton, New York on April 21--22, 1992. The purpose of this workshop was to provide a forum for, and enhance communication among, ALARA personnel, as well as to inform DOE`s field office and contractor personnel about the Office of Health`s programs and expectations from the entire DOE complex efforts in the ALARA area.The two-day workshop consisted of one day dedicated to presentations on implementing various elements of a formal ALARA program at the DOE contractors` facilities,more » regulatory aspects of ALARA programs, and DOE Headquarters` ALARA expectations/initiatives. The second day was devoted to detailed discussions on ALARA improvements and problems, and operational exercises on cost-benefit analyses and on ALARA job/experiment reviews. At this workshop, 70 health physicists and radiation safety engineers from 5 DOE Headquarter Offices, 7 DOE operations/area offices, and 27 contractor facilities exchanged information, which is expected to stimulate further improvement in the DOE contractors` ALARA programs. Individual papers are indexed separately.« less
A Three-fold Outlook of the Ultra-Efficient Engine Technology Program Office (UEET)
NASA Technical Reports Server (NTRS)
Graham, La Quilia E.
2004-01-01
The Ultra-Efficient Engine Technology (UEET) Office at NASA Glenn Research Center is a part of the Aeronautics Directorate. Its vision is to develop and hand off revolutionary turbine engine propulsion technologies that will enable future generation vehicles over a wide range of flight speeds. There are seven different technology area projects of UEET. During my tenure at NASA Glenn Research Center, my assignment was to assist three different areas of UEET, simultaneously. I worked with Kathy Zona in Education Outreach, Lynn Boukalik in Knowledge Management, and Denise Busch with Financial Management. All of my tasks were related to the business side of UEET. As an intern with Education Outreach I created a word search to partner with an exhibit of a Turbine Engine developed out of the UEET office. This exhibit is a portable model that is presented to students of varying ages. The word search complies with National Standards for Education which are part of every science, engineering, and technology teachers curriculum. I also updated a Conference Planning/Workshop Excel Spreadsheet for the UEET Office. I collected and inputted facility overviews from various venues, both on and off site to determine where to hold upcoming conferences. I then documented which facilities were compliant with the Federal Emergency Management Agency's (FEMA) Hotel and Motel Fire Safety Act of 1990. The second area in which I worked was Knowledge Management. a large knowledge management system online which has extensive documentation that continually needs reviewing, updating, and archiving. Knowledge management is the ability to bring individual or team knowledge to an organizational level so that the information can be stored, shared, reviewed, archived. Livelink and a secure server are the Knowledge Management systems that UEET utilizes, Through these systems, I was able to obtain the documents needed for archiving. My assignment was to obtain intellectual property including reports, presentations, or any other documents related to the project. My next task was to document the author, date of creation, and all other properties of each document. To archive these documents I worked extensively with Microsoft Excel. different financial systems of accounting such as the SAP business accounting system. I also learned the best ways to present financial data and shadowed my mentor as she presented financial data to both UEET's project management and the Resources Analysis and Management Office (RAMO). I analyzed the June 2004 financial data of UEET and used Microsoft Excel to input the results of the data. This process made it easier to present the full cost of the project in the month of June. In addition I assisted in the End of the Year 2003 Reconciliation of Purchases of UEET.
NASA Technical Reports Server (NTRS)
Killough, Brian D., Jr.
2008-01-01
The CEOS Systems Engineering Office will present a 2007 status report of the CEOS constellation process, present a new systems engineering framework, and analysis results from the GEO Societal Benefit Area (SBA) assessment and the OST constellation requirements assessment.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Cost accounting standard... Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING...
Code of Federal Regulations, 2010 CFR
2010-10-01
... Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.402 Cost... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Cost accounting standard...
Are Earth System model software engineering practices fit for purpose? A case study.
NASA Astrophysics Data System (ADS)
Easterbrook, S. M.; Johns, T. C.
2009-04-01
We present some analysis and conclusions from a case study of the culture and practices of scientists at the Met Office and Hadley Centre working on the development of software for climate and Earth System models using the MetUM infrastructure. The study examined how scientists think about software correctness, prioritize their requirements in making changes, and develop a shared understanding of the resulting models. We conclude that highly customized techniques driven strongly by scientific research goals have evolved for verification and validation of such models. In a formal software engineering context these represents costly, but invaluable, software integration tests with considerable benefits. The software engineering practices seen also exhibit recognisable features of both agile and open source software development projects - self-organisation of teams consistent with a meritocracy rather than top-down organisation, extensive use of informal communication channels, and software developers who are generally also users and science domain experts. We draw some general conclusions on whether these practices work well, and what new software engineering challenges may lie ahead as Earth System models become ever more complex and petascale computing becomes the norm.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Cost accounting standard....501 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST...
49 CFR 1002.3 - Updating user fees.
Code of Federal Regulations, 2010 CFR
2010-10-01
... updating fees. Each fee shall be updated by updating the cost components comprising the fee. Cost... direct labor costs are direct labor costs determined by the cost study set forth in Revision of Fees For... by total office costs for the Offices directly associated with user fee activity. Actual updating of...
48 CFR 9904.406 - Cost accounting standard-cost accounting period.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Cost accounting standard-cost accounting period. 9904.406 Section 9904.406 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT...
Code of Federal Regulations, 2012 CFR
2012-10-01
... AND TERMS Definitions 1402.170 Acronyms. A&EArchitect & Engineering ACMISAcquisition Career Management... CORContracting Officer's Representative COTRContracting Officer's Technical Representative DISPDefense Industrial... TFMTreasury Financial Manual U.S.C.United States Code VECPValue Engineering Change Proposal [75 FR 19829, Apr...
Code of Federal Regulations, 2014 CFR
2014-10-01
... AND TERMS Definitions 1402.170 Acronyms. A&EArchitect & Engineering ACMISAcquisition Career Management... CORContracting Officer's Representative COTRContracting Officer's Technical Representative DISPDefense Industrial... TFMTreasury Financial Manual U.S.C.United States Code VECPValue Engineering Change Proposal [75 FR 19829, Apr...
Code of Federal Regulations, 2011 CFR
2011-10-01
... AND TERMS Definitions 1402.170 Acronyms. A&EArchitect & Engineering ACMISAcquisition Career Management... CORContracting Officer's Representative COTRContracting Officer's Technical Representative DISPDefense Industrial... TFMTreasury Financial Manual U.S.C.United States Code VECPValue Engineering Change Proposal [75 FR 19829, Apr...
Code of Federal Regulations, 2013 CFR
2013-10-01
... AND TERMS Definitions 1402.170 Acronyms. A&EArchitect & Engineering ACMISAcquisition Career Management... CORContracting Officer's Representative COTRContracting Officer's Technical Representative DISPDefense Industrial... TFMTreasury Financial Manual U.S.C.United States Code VECPValue Engineering Change Proposal [75 FR 19829, Apr...
2011-10-04
CAPE CANAVERAL, Fla. -- NASA managers at NASA's Kennedy Space Center in Florida show off the Florida Project of the Year trophies that the crawlerway system evaluation team received from the American Society of Civil Engineers (ASCE). From left are Michael Benik, director of Center Operations; Pepper Phillips, manager of the 21st Century Ground Systems Program Office; and Russell Romanella, associate director for Engineering and Technical Operations. The Cape Canaveral branch of the ASCE nominated the team for its project, the Crawlerway Evaluation to Support a Heavy-Lift Program. The crawlerway is a 130-foot-wide, specialty-built roadway between Kennedy's Vehicle Assembly Building (VAB), where rockets and spacecraft are prepared for flight, and Launch Pad 39A and 39B. The team's more than two-year evaluation confirmed the crawlerway system would be able to support the weight of moving the agency's future heavy-lift rockets and potential commercial vehicles from the VAB to the launch pads. The award honors the team's outstanding engineering efforts in research, design, construction and management, recognizing the complexity of multi-agency coordination and cost-effective engineering advances. For more information on the American Society of Civil Engineers, visit: http://www.asce.org. Photo credit: NASA/Kim Shiflett
Organizational Knowledge Transfer Using Ontologies and a Rule-Based System
NASA Astrophysics Data System (ADS)
Okabe, Masao; Yoshioka, Akiko; Kobayashi, Keido; Yamaguchi, Takahira
In recent automated and integrated manufacturing, so-called intelligence skill is becoming more and more important and its efficient transfer to next-generation engineers is one of the urgent issues. In this paper, we propose a new approach without costly OJT (on-the-job training), that is, combinational usage of a domain ontology, a rule ontology and a rule-based system. Intelligence skill can be decomposed into pieces of simple engineering rules. A rule ontology consists of these engineering rules as primitives and the semantic relations among them. A domain ontology consists of technical terms in the engineering rules and the semantic relations among them. A rule ontology helps novices get the total picture of the intelligence skill and a domain ontology helps them understand the exact meanings of the engineering rules. A rule-based system helps domain experts externalize their tacit intelligence skill to ontologies and also helps novices internalize them. As a case study, we applied our proposal to some actual job at a remote control and maintenance office of hydroelectric power stations in Tokyo Electric Power Co., Inc. We also did an evaluation experiment for this case study and the result supports our proposal.
76 FR 53377 - Cost Accounting Standards; Allocation of Home Office Expenses to Segments
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-26
... Accounting Standards; Allocation of Home Office Expenses to Segments AGENCY: Office of Management and Budget (OMB), Office of Federal Procurement Policy (OFPP), Cost Accounting Standards Board (Board). ACTION... Accounting Standards (CAS) Board, is providing public notification of the decision to discontinue the...
Technology Catalogue. First edition
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-02-01
The Department of Energy`s Office of Environmental Restoration and Waste Management (EM) is responsible for remediating its contaminated sites and managing its waste inventory in a safe and efficient manner. EM`s Office of Technology Development (OTD) supports applied research and demonstration efforts to develop and transfer innovative, cost-effective technologies to its site clean-up and waste management programs within EM`s Office of Environmental Restoration and Office of Waste Management. The purpose of the Technology Catalogue is to provide performance data on OTD-developed technologies to scientists and engineers assessing and recommending technical solutions within the Department`s clean-up and waste management programs, asmore » well as to industry, other federal and state agencies, and the academic community. OTD`s applied research and demonstration activities are conducted in programs referred to as Integrated Demonstrations (IDs) and Integrated Programs (IPs). The IDs test and evaluate.systems, consisting of coupled technologies, at specific sites to address generic problems, such as the sensing, treatment, and disposal of buried waste containers. The IPs support applied research activities in specific applications areas, such as in situ remediation, efficient separations processes, and site characterization. The Technology Catalogue is a means for communicating the status. of the development of these innovative technologies. The FY93 Technology Catalogue features technologies successfully demonstrated in the field through IDs and sufficiently mature to be used in the near-term. Technologies from the following IDs are featured in the FY93 Technology Catalogue: Buried Waste ID (Idaho National Engineering Laboratory, Idaho); Mixed Waste Landfill ID (Sandia National Laboratories, New Mexico); Underground Storage Tank ID (Hanford, Washington); Volatile organic compound (VOC) Arid ID (Richland, Washington); and VOC Non-Arid ID (Savannah River Site, South Carolina).« less
Photocopy of plan (in U.S. Army office of Army Engineers ...
Photocopy of plan (in U.S. Army office of Army Engineers plans and drawings, Fort Hancock and Sandy hook proving ground, record group 7, drawer 44, Cartographic and Architectural branc, The National Archives, Washington, DC), U.S. Engineer Office, New York District, Harbor Defenses of New York Mine Boathouse, location plan and elevations, Fort Hancock, New Jersey, July 1943 Detail of western docking structure - U.S. Coast Guard Sandy Hook Station, Western Docking Structure, West of intersection of Canfield Road & Hartshorne Drive, Highlands, Monmouth County, NJ
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Cost accounting standard... 9905.502 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST...
Cost and Schedule Analytical Techniques Development: Option 2 Year
NASA Technical Reports Server (NTRS)
1997-01-01
This Final Report summarizes the activities performed by Science Applications International Corporation (SAIC) for the Option 2 Year from December 1, 1996 through November 30, 1997. The Final Report is in compliance with Paragraph 5 of Section F of the contract. This CSATD contract provides products and deliverable in the form of models, data bases, methodologies, studies and analyses for the NASA Marshall Space Flight Center's (MSFC) Engineering Cost Office (PPO3) the Program Plans and Requirements Officer (PP02), and other user organizations. Detailed Monthly Progress reports were submitted to MSFC in accordance with the contract's Statement of Work, Section TV "Reporting and Documentation". These reports spelled out each month's specific work accomplishments, deliverables submitted, major meetings held, and other pertinent information. This Final Report will summarize these activities at higher level. During this contract Option Year, SAIC expended 29,830 man-hours in tile performance of tasks called out in the Statement of Work and reported oil in this yearly Final Report. This represents approximately 16 full-time EPs. Included are the basis Huntsville-based team, plus SAIC specialists in San Diego, Ames Research Center, Chicago, and Colorado Springs performing specific tasks for which they are uniquely qualified.
48 CFR 9904.402-61 - Interpretation.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-61 Section 9904.402-61 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.402-61 Interpretation. (a) 9904.402, Cost Accounting...
48 CFR 9904.412-60 - Illustrations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.412-60 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.412-60 Illustrations. (a) Components of pension cost. (1...
48 CFR 9904.409 - Cost accounting standard-depreciation of tangible capital assets.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Cost accounting standard... ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.409 Cost accounting standard...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Johnson, D.R.
1997-04-01
The purpose of the Heavy Vehicle Propulsion System Materials Program is the development of materials: ceramics, intermetallics, metal alloys, and metal and ceramic coatings, to support the dieselization of class 1-3 trucks to realize a 35% fuel-economy improvement over current gasoline-fueled trucks and to support commercialization of fuel-flexible LE-55 low-emissions, high-efficiency diesel engines for class 7-8 trucks. The Office of Transportation Technologies, Office of Heavy Vehicle Technologies (OTT OHVT) has an active program to develop the technology for advanced LE-55 diesel engines with 55% efficiency and low emissions levels of 2.0 g/bhp-h NO{sub x} and 0.05 g/bhp-h particulates. The goalmore » is also for the LE-55 engine to run on natural gas with efficiency approaching that of diesel fuel. The LE-55 program is being completed in FY 1997 and, after approximately 10 years of effort, has largely met the program goals of 55% efficiency and low emissions. However, the commercialization of the LE-55 technology requires more durable materials than those that have been used to demonstrate the goals. Heavy Vehicle Propulsion System Materials will, in concert with the heavy duty diesel engine companies, develop the durable materials required to commercialize the LE-55 technologies. OTT OHVT also recognizes a significant opportunity for reduction in petroleum consumption by dieselization of pickup trucks, vans, and sport utility vehicles. Application of the diesel engine to class 1, 2, and 3 trucks is expected to yield a 35% increase in fuel economy per vehicle. The foremost barrier to diesel use in this market is emission control. Once an engine is made certifiable, subsequent challenges will be in cost; noise, vibration, and harshness (NVH); and performance. Separate abstracts have been submitted to the database for contributions to this report.« less
1986-09-01
opportunities will determine career success (7:9). Air Force Regulation (AFR) 36-23 states that the goals of the officer assignment system are to "fulfill present...goals" (4:3). In his AFIT thesis, Cady identifies some career profiles of successful civil engineering officers. He defines career success as an...single type of experience or prescribed plan that will guarantee career success . He found’that general officers have adaptive and innovative careers with
48 CFR 9904.411 - Cost accounting standard-accounting for acquisition costs of material.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Cost accounting standard-accounting for acquisition costs of material. 9904.411 Section 9904.411 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND...
Code of Federal Regulations, 2010 CFR
2010-10-01
... unit general and administrative expenses to final cost objectives. 9904.410 Section 9904.410 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-05
... Accounting Standards: Clarification of the Exemption From Cost Accounting Standards for Firm-Fixed-Price... Management and Budget (OMB), Office of Federal Procurement Policy, Cost Accounting Standards Board. ACTION: Proposed rule. SUMMARY: The Office of Federal Procurement Policy (OFPP), Cost Accounting Standards (CAS...
48 CFR 9903.301 - Definitions.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9903.301 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS.... Asset accountability unit. See 9904.404-30. Assignment of cost to cost accounting periods. See 9903.302...
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.404.20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.404.20 Purpose. This Standard requires that, for purposes of cost...
Code of Federal Regulations, 2010 CFR
2010-10-01
... consistent application of sound cost accounting principles covering all incurred costs. (2) The Standard is... Section 9905.505-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING...
48 CFR 9904.404-60 - Illustrations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.404-60 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.404-60 Illustrations. (a) Illustrations of costs which must be...
48 CFR 9904.402-60 - Illustrations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.402-60 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.402-60 Illustrations. (a) Illustrations of costs which are incurred...
Financial Officer Finance Section Office of the Chief Operating Officer Facilities Engineering Services Accelerator Division Accelerator Physics Center Office of the Chief Safety Officer Environment, Safety, Health and Quality Section Office of the Chief Project Officer Office of Project Support Services Office of
3. Photographic copy of architectural site plans for Officers' Quarters ...
3. Photographic copy of architectural site plans for Officers' Quarters "A" & "B" and Warehouses "A" & "B": Taylor & Barnes, Architects & Engineers, 803 W. Third Street, Los Angeles California, O.C.E. Office of Civil Engineer Job No. Muroc ESA 210-48 and 210-49, Military Construction: Muroc Flight Test Base, Muroc, California, Warehouses and Additional Housing for Officers: Location Plan, Grading & Paving, Sheet No. 2 of 16, May 1945. Reproduced from the holdings of the National Archives, Pacific Southwest Region - Edwards Air Force Base, North Base, Officers' Quarters A, North Base Road, Boron, Kern County, CA
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.400 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.400 [Reserved] ...
NASA Technical Reports Server (NTRS)
Sherwood, Brent; McCleese, Daniel
2012-01-01
Space science missions are increasingly challenged today: in ambition, by increasingly sophisticated hypotheses tested; in development, by the increasing complexity of advanced technologies; in budgeting, by the decline of flagship-class mission opportunities; in management, by expectations for breakthrough science despite a risk-averse programmatic climate; and in planning, by increasing competition for scarce resources. How are the space-science missions of tomorrow being formulated? The paper describes the JPL Innovation Foundry, created in 2011, to respond to this evolving context. The Foundry integrates methods, tools, and experts that span the mission concept lifecycle. Grounded in JPL's heritage of missions, flight instruments, mission proposals, and concept innovation, the Foundry seeks to provide continuity of support and cost-effective, on-call access to the right domain experts at the right time, as science definition teams and Principal Investigators mature mission ideas from "cocktail napkin" to PDR. The Foundry blends JPL capabilities in proposal development and concurrent engineering, including Team X, with new approaches for open-ended concept exploration in earlier, cost-constrained phases, and with ongoing research and technology projects. It applies complexity and cost models, projectformulation lessons learned, and strategy analyses appropriate to each level of concept maturity. The Foundry is organizationally integrated with JPL formulation program offices; staffed by JPL's line organizations for engineering, science, and costing; and overseen by senior Laboratory leaders to assure experienced coordination and review. Incubation of each concept is tailored depending on its maturity and proposal history, and its highest leverage modeling and analysis needs.
Electrical engineering research support for FDOT Traffic Statistics Office
DOT National Transportation Integrated Search
2010-03-01
The aim of this project was to provide electrical engineering support for the telemetered traffic monitoring sites (TTMSs) operated by the Statistics Office of the Florida Department of Transportation. This project was a continuation of project BD-54...
7 CFR 3016.22 - Allowable costs.
Code of Federal Regulations, 2010 CFR
2010-01-01
... uniform cost accounting standards that comply with cost principles acceptable to the Federal agency. ... Regulations of the Department of Agriculture (Continued) OFFICE OF THE CHIEF FINANCIAL OFFICER, DEPARTMENT OF... GOVERNMENTS Post-Award Requirements Financial Administration § 3016.22 Allowable costs. (a) Limitation on use...
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.417-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.417-20 Purpose. The purpose of this Cost Accounting Standard is to...
Code of Federal Regulations, 2010 CFR
2010-10-01
... measurement and cost assignment. (b) This Cost Accounting Standard is not intended to cover the use of pre... Section 9904.407-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING...
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.414-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.414-20 Purpose. The purpose of this Cost Accounting Standard is to...
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.406-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.406-20 Purpose. The purpose of this Cost Accounting Standard is to...
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.410-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.410-20 Purpose. The purpose of this Cost Accounting Standard is to...
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.403-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.403-20 Purpose. (a) The purpose of this Cost Accounting Standard is...
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.401-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.401-20 Purpose. The purpose of this Cost Accounting Standard is to...
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.405-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.405-20 Purpose. (a) The purpose of this Cost Accounting Standard is...
7 CFR 2.71 - Director, Office of Risk Assessment and Cost-Benefit Analysis.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 1 2011-01-01 2011-01-01 false Director, Office of Risk Assessment and Cost-Benefit Analysis. 2.71 Section 2.71 Agriculture Office of the Secretary of Agriculture DELEGATIONS OF AUTHORITY BY THE SECRETARY OF AGRICULTURE AND GENERAL OFFICERS OF THE DEPARTMENT Delegations of Authority by the...
7 CFR 2.71 - Director, Office of Risk Assessment and Cost-Benefit Analysis.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 1 2012-01-01 2012-01-01 false Director, Office of Risk Assessment and Cost-Benefit Analysis. 2.71 Section 2.71 Agriculture Office of the Secretary of Agriculture DELEGATIONS OF AUTHORITY BY THE SECRETARY OF AGRICULTURE AND GENERAL OFFICERS OF THE DEPARTMENT Delegations of Authority by the...
7 CFR 2.71 - Director, Office of Risk Assessment and Cost-Benefit Analysis.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 1 2014-01-01 2014-01-01 false Director, Office of Risk Assessment and Cost-Benefit Analysis. 2.71 Section 2.71 Agriculture Office of the Secretary of Agriculture DELEGATIONS OF AUTHORITY BY THE SECRETARY OF AGRICULTURE AND GENERAL OFFICERS OF THE DEPARTMENT Delegations of Authority by the...
1990-11-30
This is our final report on the audit of Architect-Engineer Contracting for the Officer in Charge of Construction, Naval Facilities Engineering...Command Contracts, Mediterranean, for your information and use. This is the fourth in a series of reports issued as part of the audit of architect-engineer...A-E) contracting. The Contract Management Directorate made the audit from August 1989 through July 1990. When we expanded the audit scope to include
48 CFR 9904.403-10 - [Reserved
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.403-10 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.403-10 [Reserved] ...
48 CFR 9904.408-10 - [Reserved
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.408-10 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.408-10 [Reserved] ...
48 CFR 9904.407-10 - [Reserved
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.407-10 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.407-10 [Reserved] ...
48 CFR 9904.406-10 - [Reserved
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.406-10 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.406-10 [Reserved] ...
48 CFR 9904.405-10 - [Reserved
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.405-10 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.405-10 [Reserved] ...
48 CFR 9904.410-10 - [Reserved
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.410-10 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.410-10 [Reserved] ...
48 CFR 9904.401-10 - [Reserved
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.401-10 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.401-10 [Reserved] ...
48 CFR 9904.402-10 - [Reserved
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.402-10 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.402-10 [Reserved] ...
48 CFR 9904.404-10 - [Reserved
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.404-10 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.404-10 [Reserved] ...
48 CFR 9904.409-10 - [Reserved
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.409-10 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.409-10 [Reserved] ...
Naidu, Harini; Noordzij, J Pieter; Samim, Arang; Jalisi, Scharukh; Grillone, Gregory A
2012-09-01
To compare the diagnostic yield, safety, and cost of biopsies of laryngopharyngeal tumor performed in an office setting with those performed in the operating room (OR) under general anesthesia. This was a retrospective review of patients' records at Boston Medical Center from 2006 to 2008. In-office biopsies were performed using flexible digital videolaryngoscopy with cup forcep biopsies taken via the working channel in patients in whom cancer was strongly suspected. Patients whose in-office biopsies were nondiagnostic or suspected to be falsely negative were taken to the OR for biopsy under general anesthesia and served as the control group. Twelve patients fit the selection criteria and had in-office biopsies attempted. One patient could not tolerate the in-office biopsy. Seven of the 11 in-office biopsies performed were diagnostic for squamous cell carcinoma. The average cost (facility and professional otolaryngology charges) for an in-office biopsy was $2053.91. Five of these patients required further biopsy in the OR at an average cost (charges for surgeon, OR, anesthesia, and recovery room) of $9024.47. There were no significant complications reported for any of the procedures. In patients with strongly suspected laryngopharyngeal cancer, in-office cup forcep biopsies were 64% diagnostic. When compared with the OR, in-office cup biopsies of laryngopharyngeal tumor are safe and considerably more cost-effective. Although 36% of patients required operative biopsies, the cost would have been considerably higher in this cohort if all patients had gone to the OR for biopsies. Copyright © 2012 The Voice Foundation. Published by Mosby, Inc. All rights reserved.
Energy Smart Schools--Applied Research, Field Testing, and Technology Integration
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nebiat Solomon; Robin Vieira; William L. Manz
2004-12-01
The National Association of State Energy Officials (NASEO) in conjunction with the California Energy Commission, the Energy Center of Wisconsin, the Florida Solar Energy Center, the New York State Energy Research and Development Authority, and the Ohio Department of Development's Office of Energy Efficiency conducted a four-year, cost-share project with the U.S. Department of Energy (USDOE), Office of Energy Efficiency and Renewable Energy to focus on energy efficiency and high-performance technologies in our nation's schools. NASEO was the program lead for the MOU-State Schools Working group, established in conjunction with the USDOE Memorandum of Understanding process for collaboration among statemore » and federal energy research and demonstration offices and organizations. The MOU-State Schools Working Group included State Energy Offices and other state energy research organizations from all regions of the country. Through surveys and analyses, the Working Group determined the school-related energy priorities of the states and established a set of tasks to be accomplished, including the installation and evaluation of microturbines, advanced daylighting research, testing of schools and classrooms, and integrated school building technologies. The Energy Smart Schools project resulted in the adoption of advanced energy efficiency technologies in both the renovation of existing schools and building of new ones; the education of school administrators, architects, engineers, and manufacturers nationwide about the energy-saving, economic, and environmental benefits of energy efficiency technologies; and improved the learning environment for the nation's students through use of better temperature controls, improvements in air quality, and increased daylighting in classrooms. It also provided an opportunity for states to share and replicate successful projects to increase their energy efficiency while at the same time driving down their energy costs.« less
48 CFR 9904.417 - Cost of money as an element of the cost of capital assets under construction.
Code of Federal Regulations, 2010 CFR
2010-10-01
... element of the cost of capital assets under construction. 9904.417 Section 9904.417 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT... of money as an element of the cost of capital assets under construction. ...
48 CFR 9904.407 - Use of standard costs for direct material and direct labor.
Code of Federal Regulations, 2010 CFR
2010-10-01
... ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.407 Use of standard costs for direct... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Use of standard costs for...
Hysteroscopic Endometrial Polypectomy: Clinical and Economic Data in Decision Making.
Franchini, Mario; Lippi, Giuseppe; Calzolari, Stefano; Giarrè, Giovanna; Gubbini, Giampietro; Catena, Ursula; Di Spiezio Sardo, Attilio; Florio, Pasquale
To compare the costs of hysteroscopic polypectomy using mechanical and electrosurgical systems in the hospital operating room and an office-based setting. Retrospective cohort study (Canadian Task Force classification II-2). Tertiary referral hospital and center for gynecologic care. Seven hundred and fifty-four women who underwent endometrial polypectomy between January 20, 2015, and April 27, 2016. Hysteroscopic endometrial polypectomy performed in the same-day hospital setting or office setting using one of the following: bipolar electrode, loop electrode, mechanical device, or hysteroscopic tissue removal system. The various costs associated with the 2 clinical settings at Palagi Hospital, Florence, Italy were compiled, and a direct cost comparison was made using an activity-based cost-management system. The costs for using reusable loop electrode resection-16 or loop electrode resection-26 were significantly less expensive than using disposable loop electrode resection-27, the tissue removal system, or bipolar electrode resection (p = .0002). Total hospital costs for polypectomy with all systems were significantly less expensive in an office setting compared with same-day surgery in the hospital setting (p = .0001). Office-based hysteroscopic tissue removal was associated with shorter operative time compared with the other procedures (p = .0002) CONCLUSION: The total cost of hysteroscopic polypectomy is markedly higher when using disposable equipment compared with reusable equipment, both in the hospital operating room and the office setting. Same-day hospital or office-based surgery with reusable loop electrode resection is the most cost-effective approach in each settings, but requires experienced surgeons. Finally, the shorter surgical time should be taken into consideration for patients undergoing vaginal polypectomy in the office setting, owing more to patient comfort than to cost savings. Copyright © 2017 American Association of Gynecologic Laparoscopists. Published by Elsevier Inc. All rights reserved.
Percutaneous Trigger Finger Release: A Cost-effectiveness Analysis.
Gancarczyk, Stephanie M; Jang, Eugene S; Swart, Eric P; Makhni, Eric C; Kadiyala, Rajendra Kumar
2016-07-01
Percutaneous trigger finger releases (TFRs) performed in the office setting are becoming more prevalent. This study compares the costs of in-hospital open TFRs, open TFRs performed in ambulatory surgical centers (ASCs), and in-office percutaneous releases. An expected-value decision-analysis model was constructed from the payer perspective to estimate total costs of the three competing treatment strategies for TFR. Model parameters were estimated based on the best available literature and were tested using multiway sensitivity analysis. Percutaneous TFR performed in the office and then, if needed, revised open TFR performed in the ASC, was the most cost-effective strategy, with an attributed cost of $603. The cost associated with an initial open TFR performed in the ASC was approximately 7% higher. Initial open TFR performed in the hospital was the least cost-effective, with an attributed cost nearly twice that of primary percutaneous TFR. An initial attempt at percutaneous TFR is more cost-effective than an open TFR. Currently, only about 5% of TFRs are performed in the office; therefore, a substantial opportunity exists for cost savings in the future. Decision model level II.
47 CFR 0.241 - Authority delegated.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMISSION ORGANIZATION Delegations of Authority Chief... is delegated to the Chief of the Office of Engineering and Technology: Provided, that the following... orders making changes, except that the Chief of the Office of Engineering and Technology is delegated...
75 FR 70044 - Withdrawal of Regulatory Guide 1.39
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-16
...: Hector L. Rodriguez-Luccioni, Regulatory Guide Development Branch, Division of Engineering, Office of...-251-7685 or e-mail [email protected] . SUPPLEMENTARY INFORMATION: I. Introduction The... N. Ridgely, Acting Chief, Regulatory Guide Development Branch, Division of Engineering, Office of...
1984-11-01
1,746 N. RAL HAZARDS AND RESEARCH NEEDS IN COASTAL AND OCEAN I ENEERING SUMMA..W NATIONAL SCIENCE FOUNDATION WA ;NG ON OC 1NAVE F AL NOV 84 FG02 N N...and Research Needs in Coastal and Ocean Engineering Summary and Recommendations to the National Science Foundation and the Office of Naval Research A T...Recommendations to the National Science Foundation and the Office of Naval Research by the Ad Hoc Committee for the Civil and Environmental Engineering
48 CFR 9904.404-50 - Techniques for application.
Code of Federal Regulations, 2010 CFR
2010-10-01
.... 9904.404-50 Section 9904.404-50 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.404-50 Techniques for application. (a) The cost to...
48 CFR 9904.406-50 - Techniques for application.
Code of Federal Regulations, 2010 CFR
2010-10-01
.... 9904.406-50 Section 9904.406-50 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.406-50 Techniques for application. (a) The cost of an...
Buy or sell used musical instruments | News
Financial Officer Finance Section Office of the Chief Operating Officer Facilities Engineering Services Accelerator Division Accelerator Physics Center Office of the Chief Safety Officer Environment, Safety, Health and Quality Section Office of the Chief Project Officer Office of Project Support Services Office of
David Toback re-elected CDF co-spokesperson | News
Financial Officer Finance Section Office of the Chief Operating Officer Facilities Engineering Services Accelerator Division Accelerator Physics Center Office of the Chief Safety Officer Environment, Safety, Health and Quality Section Office of the Chief Project Officer Office of Project Support Services Office of
Code of Federal Regulations, 2010 CFR
2010-07-01
... Employment (VR&E) Officer's review of program costs. The VR&E Officer will review the program costs for the... for a calendar year exceeds $25,000. The VR&E Officer may not delegate this responsibility. The case manager will neither sign a rehabilitation plan nor authorize expenditures before the VR&E Officer...
Code of Federal Regulations, 2010 CFR
2010-07-01
... STATES NAVY REGULATIONS AND OFFICIAL RECORDS The Commanding Officer Commanding Officers in General § 700..., welfare, and recreational activities with the approval of a commanding officer provided: (1) The cost does... estimated cost have been deposited with the commanding officer or unless otherwise provided by law. (c) Work...
Code of Federal Regulations, 2012 CFR
2012-07-01
... STATES NAVY REGULATIONS AND OFFICIAL RECORDS The Commanding Officer Commanding Officers in General § 700..., welfare, and recreational activities with the approval of a commanding officer provided: (1) The cost does... estimated cost have been deposited with the commanding officer or unless otherwise provided by law. (c) Work...
Code of Federal Regulations, 2014 CFR
2014-07-01
... STATES NAVY REGULATIONS AND OFFICIAL RECORDS The Commanding Officer Commanding Officers in General § 700..., welfare, and recreational activities with the approval of a commanding officer provided: (1) The cost does... estimated cost have been deposited with the commanding officer or unless otherwise provided by law. (c) Work...
Code of Federal Regulations, 2013 CFR
2013-07-01
... STATES NAVY REGULATIONS AND OFFICIAL RECORDS The Commanding Officer Commanding Officers in General § 700..., welfare, and recreational activities with the approval of a commanding officer provided: (1) The cost does... estimated cost have been deposited with the commanding officer or unless otherwise provided by law. (c) Work...
Code of Federal Regulations, 2011 CFR
2011-07-01
... STATES NAVY REGULATIONS AND OFFICIAL RECORDS The Commanding Officer Commanding Officers in General § 700..., welfare, and recreational activities with the approval of a commanding officer provided: (1) The cost does... estimated cost have been deposited with the commanding officer or unless otherwise provided by law. (c) Work...
Code of Federal Regulations, 2014 CFR
2014-07-01
... Employment (VR&E) Officer's review of program costs. The VR&E Officer will review the program costs for the... for a calendar year exceeds $25,000. The VR&E Officer may not delegate this responsibility. The case manager will neither sign a rehabilitation plan nor authorize expenditures before the VR&E Officer...
Code of Federal Regulations, 2012 CFR
2012-07-01
... Employment (VR&E) Officer's review of program costs. The VR&E Officer will review the program costs for the... for a calendar year exceeds $25,000. The VR&E Officer may not delegate this responsibility. The case manager will neither sign a rehabilitation plan nor authorize expenditures before the VR&E Officer...
Code of Federal Regulations, 2013 CFR
2013-07-01
... Employment (VR&E) Officer's review of program costs. The VR&E Officer will review the program costs for the... for a calendar year exceeds $25,000. The VR&E Officer may not delegate this responsibility. The case manager will neither sign a rehabilitation plan nor authorize expenditures before the VR&E Officer...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-05
... OFFICE OF MANAGEMENT AND BUDGET Cost of Hospital and Medical Care Treatment Furnished by the... Third Persons AGENCY: Office of Management and Budget, Executive Office of the President. ACTION: Notice.... 593; 42 U.S.C. 2652), and delegated to the Director of the Office of Management and Budget by the...
Profile of a Successful Civil Engineering Career in the United States Air Force.
1984-09-01
Introduction ........ * * ........... 7 Career Success .. .. .. . .. . . ... 4- . .. ....... 8 Research Methods . .. . .. a.. . .. .. ............ it III...Definition of Terms I The following terms, for the purpose of this study, were defined as: Career success refers to an Air Force civil engineering officer...discussion of career success . An Air Force civil engineer is an officer currently possessing a 55XX duty Air Force . Specialty Code (AFSC). Statement of
48 CFR 43.205 - Contract clauses.
Code of Federal Regulations, 2011 CFR
2011-10-01
...-engineer or other professional services, and no supplies are to be furnished, the contracting officer shall...-engineer or other professional services, the contracting officer shall use the clause with its Alternate... Accounting, in solicitations and contracts for supply and research and development contracts of significant...
48 CFR 43.205 - Contract clauses.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-engineer or other professional services, and no supplies are to be furnished, the contracting officer shall...-engineer or other professional services, the contracting officer shall use the clause with its Alternate... Accounting, in solicitations and contracts for supply and research and development contracts of significant...
48 CFR 43.205 - Contract clauses.
Code of Federal Regulations, 2013 CFR
2013-10-01
...-engineer or other professional services, and no supplies are to be furnished, the contracting officer shall...-engineer or other professional services, the contracting officer shall use the clause with its Alternate... Accounting, in solicitations and contracts for supply and research and development contracts of significant...
48 CFR 43.205 - Contract clauses.
Code of Federal Regulations, 2014 CFR
2014-10-01
...-engineer or other professional services, and no supplies are to be furnished, the contracting officer shall...-engineer or other professional services, the contracting officer shall use the clause with its Alternate... Accounting, in solicitations and contracts for supply and research and development contracts of significant...
48 CFR 43.205 - Contract clauses.
Code of Federal Regulations, 2012 CFR
2012-10-01
...-engineer or other professional services, and no supplies are to be furnished, the contracting officer shall...-engineer or other professional services, the contracting officer shall use the clause with its Alternate... Accounting, in solicitations and contracts for supply and research and development contracts of significant...
21. Post Engineer Office, Presidio of San Francisco, Letterman Army ...
21. Post Engineer Office, Presidio of San Francisco, Letterman Army Hospital. EKG Cardiology Clinic, Building 1049. December 1955. BUILDING 1049. - Presidio of San Francisco, Letterman General Hospital, Building No. 12, Letterman Hospital Complex, Edie Road, San Francisco, San Francisco County, CA
18. Photocopy of scaled drawing (from the Engineering Office of ...
18. Photocopy of scaled drawing (from the Engineering Office of the Veterans Administration) originally drawn by Trone, November 9, 1933. Final revisions date December 10, 1957. Basement plan. - Roanoke Veterans Administration Hospital, Building No. 6, 1970 Roanoke Boulevard, Salem, Salem, VA
16. Photocopy of scaled drawing (from the Engineering Office of ...
16. Photocopy of scaled drawing (from the Engineering Office of the Veterans Administration) drawn by Ayars, November 9, 1933. Original drawings of the northeast and southwest elevations. - Roanoke Veterans Administration Hospital, Building No. 6, 1970 Roanoke Boulevard, Salem, Salem, VA
77 FR 25495 - Proposed Flood Hazard Determinations
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-30
... Docket No. FEMA-B-1250, to Luis Rodriguez, Chief, Engineering Management Branch, Federal Insurance [email protected] . FOR FURTHER INFORMATION CONTACT: Luis Rodriguez, Chief, Engineering Management... Mechanic Falls Town Office, 108 Lewiston Street, Mechanic Falls, ME 04256. Town of Minot Town Office, 329...
ONSITE ENGINEERING REPORT FOR SOLIDIFICATION/ STABILIZATION TREATMENT TESTING OF CONTAMINATED SOILS
The EPA's Office of Solid Waste and Emergency Response (OSWER) is currently developing land disposal restrictions (LDRs) for contaminated soil and debris (CS&D). The Office of Research and Development, through its Risk Reduction Engineering Laboratory (RREL), is providing support...
Non-Heat Treatable Alloy Sheet Products
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hayden, H.W.; Barthold, G.W.; Das, S.K.
ALCAR is an innovative approach for conducting multi-company, pre-competitive research and development programs. ALCAR has been formed to crate a partnership of aluminum producers, the American Society of Mechanical Engineers Center for Research and Technology Development (ASME/CRTD), the United States Department of Energy (USDOE), three USDOE National Laboratories, and a Technical Advisory Committee for conducting cooperative, pre-competitive research on the development of flower-cost, non-heat treated (NHT) aluminum alloys for automotive sheet applications with strength, formability and surface appearance similar to current heat treated (HT) aluminum alloys under consideration. The effort has been supported by the USDOE, Office of Transportation Technologymore » (OTT) through a three-year program with 50/50 cost share at a total program cost of $3 million. The program has led to the development of new and modified 5000 series aluminum ally compositions. Pilot production-size ingots have bee n melted, cast, hot rolled and cold rolled. Stamping trials on samples of rolled product for demonstrating production of typical automotive components have been successful.« less
HOT CELL BUILDING, TRA632, INTERIOR. WINDOWED ROOM IS OFFICE; NEXT ...
HOT CELL BUILDING, TRA-632, INTERIOR. WINDOWED ROOM IS OFFICE; NEXT DOOR WAS DARKROOM, AND THIRD DOOR LED TO ANOTHER OFFICE. ALL ARE ALONG NORTH WALL OF BUILDING (ETR EXTENSION OF 1958). CAMERA FACES NORTHEAST. PUMICE BLOCK WALLS. INL NEGATIVE NO. HD46-29-1. Mike Crane, Photographer, 2/2005 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
24 CFR 1710.117 - Cost sheet, signature of Senior Executive Officer.
Code of Federal Regulations, 2013 CFR
2013-04-01
.... However, any costs that are identical for all lots may be pre-printed. (ii) If a central water or sewer... 24 Housing and Urban Development 5 2013-04-01 2013-04-01 false Cost sheet, signature of Senior... REGISTRATION Reporting Requirements § 1710.117 Cost sheet, signature of Senior Executive Officer. (a) Cost...
24 CFR 1710.117 - Cost sheet, signature of Senior Executive Officer.
Code of Federal Regulations, 2014 CFR
2014-04-01
.... However, any costs that are identical for all lots may be pre-printed. (ii) If a central water or sewer... 24 Housing and Urban Development 5 2014-04-01 2014-04-01 false Cost sheet, signature of Senior... REGISTRATION Reporting Requirements § 1710.117 Cost sheet, signature of Senior Executive Officer. (a) Cost...
24 CFR 1710.117 - Cost sheet, signature of Senior Executive Officer.
Code of Federal Regulations, 2011 CFR
2011-04-01
.... However, any costs that are identical for all lots may be pre-printed. (ii) If a central water or sewer... 24 Housing and Urban Development 5 2011-04-01 2011-04-01 false Cost sheet, signature of Senior... REGISTRATION Reporting Requirements § 1710.117 Cost sheet, signature of Senior Executive Officer. (a) Cost...
24 CFR 1710.117 - Cost sheet, signature of Senior Executive Officer.
Code of Federal Regulations, 2012 CFR
2012-04-01
.... However, any costs that are identical for all lots may be pre-printed. (ii) If a central water or sewer... 24 Housing and Urban Development 5 2012-04-01 2012-04-01 false Cost sheet, signature of Senior... REGISTRATION Reporting Requirements § 1710.117 Cost sheet, signature of Senior Executive Officer. (a) Cost...
Cost and price estimate of Brayton and Stirling engines in selected production volumes
NASA Technical Reports Server (NTRS)
Fortgang, H. R.; Mayers, H. F.
1980-01-01
The methods used to determine the production costs and required selling price of Brayton and Stirling engines modified for use in solar power conversion units are presented. Each engine part, component and assembly was examined and evaluated to determine the costs of its material and the method of manufacture based on specific annual production volumes. Cost estimates are presented for both the Stirling and Brayton engines in annual production volumes of 1,000, 25,000, 100,000 and 400,000. At annual production volumes above 50,000 units, the costs of both engines are similar, although the Stirling engine costs are somewhat lower. It is concluded that modifications to both the Brayton and Stirling engine designs could reduce the estimated costs.
48 CFR 9904.402-62 - Exemption.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.402-62 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.402-62 Exemption. None for this Standard. ...
48 CFR 9904.405-62 - Exemption.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.405-62 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.405-62 Exemption. None for this Standard. ...
48 CFR 9904.404-62 - Exemption.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.404-62 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.404-62 Exemption. None for this Standard. ...
48 CFR 9904.401-62 - Exemption.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.401-62 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.401-62 Exemption. None for this Standard. ...
48 CFR 9904.407-62 - Exemption.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.407-62 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.407-62 Exemption. None for this Standard. ...
48 CFR 9904.403-62 - Exemption. [Reserved
Code of Federal Regulations, 2010 CFR
2010-10-01
....403-62 Section 9904.403-62 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.403-62 Exemption. [Reserved] ...
48 CFR 9904.406-62 - Exemption.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.406-62 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.406-62 Exemption. None for this Standard. ...
From Nigel Lockyer: Five things you should know | News
Financial Officer Finance Section Office of the Chief Operating Officer Facilities Engineering Services Accelerator Division Accelerator Physics Center Office of the Chief Safety Officer Environment, Safety, Health and Quality Section Office of the Chief Project Officer Office of Project Support Services Office of
MicroBooNE project team recognized by Department of Energy | News
Financial Officer Finance Section Office of the Chief Operating Officer Facilities Engineering Services Accelerator Division Accelerator Physics Center Office of the Chief Safety Officer Environment, Safety, Health and Quality Section Office of the Chief Project Officer Office of Project Support Services Office of
Environmental management requirements/defensible costs project. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-02-01
Lockheed Idaho Technologies Company (LITCO) used a systems engineering approach to develop the first formal requirements baseline for Idaho National Engineering Laboratory (INEL) Environmental Management (EM) Programs. The recently signed Settlement Agreement with the State of Idaho (Batt Agreement), along with dramatically reduced EM funding targets from Department of Energy (DOE) headquarters, drove the immediacy of this effort. Programs have linked top-level requirements to work scope to cost estimates. All EM work, grouped by decision units, was scrubbed by INEL EM programs and by an independent {open_quotes}Murder Board.{close_quotes} Direct participation of upper level management from LITCO and the DOE-Idaho Operationsmore » Office ensured best information and decisions. The result is a scrubbed down, defensible budget tied to top-level requirements for use in the upcoming DOE-Headquarters` budget workout, the Internal Review Board, the FY98 Activity Data Sheets submittal, and preparation of the FY97 control accounts and out-year plans. In addition to the remarkable accomplishments during the past eight weeks, major issues were identified and documented and follow-on tasks are underway which will lead to further improvements in INEL EM program management.« less
2 CFR 200.2 - Acquisition cost.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 2 Grants and Agreements 1 2014-01-01 2014-01-01 false Acquisition cost. 200.2 Section 200.2 Grants and Agreements Office of Management and Budget Guidance for Grants and Agreements OFFICE OF MANAGEMENT... REQUIREMENTS FOR FEDERAL AWARDS Acronyms and Definitions Acronyms § 200.2 Acquisition cost. Acquisition cost...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-10
... Accounting Standards: Elimination of the Exemption From Cost Accounting Standards for Contracts and...: Office of Management and Budget (OMB), Office of Federal Procurement Policy (OFPP), Cost Accounting... Accounting Standards (CAS) Board, is publishing a final rule to eliminate the exemption from regulations...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Johnson, DR
2000-12-11
The purpose of the Heavy Vehicle Propulsion System Materials Program is the development of materials: ceramics, intermetallics, metal alloys, and metal and ceramic coatings, to support the dieselization of class 1-3 trucks to realize a 35% fuel-economy improvement over current gasoline-fueled trucks and to support commercialization of fuel-flexible LE-55 low-emissions, high-efficiency diesel engines for class 7-8 trucks. The Office of Transportation Technologies, Office of Heavy Vehicle Technologies (OTT OHVT) has an active program to develop the technology for advantages LE-55 diesel engines with 55% efficiency and low emissions levels of 2.0 g/bhp-h NOx and 0.05 g/bhp-h particulates. The goal ismore » also for the LE-55 engine to run on natural gas with efficiency approaching that of diesel fuel. The LE-55 program is being completed in FY 1997 and, after approximately 10 years of effort, has largely met the program goals of 55% efficiency and low emissions. However, the commercialization of the LE-55 technology requires more durable materials than those that have been used to demonstrate the goals. Heavy Vehicle Propulsion System Materials will, in concert with the heavy duty diesel engine companies, develop the durable materials required to commercialize the LE-55 technologies. OTT OHVT also recognizes a significant opportunity for reduction in petroleum consumption by dieselization of pickup trucks, vans, and sport utility vehicles. Application of the diesel engine to class 1, 2, and 3 trucks is expected to yield a 35% increase in fuel economy per vehicle. The foremost barrier to diesel use in this market is emission control. Once an engine is made certifiable, subsequent challenges will be in cost; noise, vibration, and harshness (NVH); and performance. The design of advanced components for high-efficiency diesel engines has, in some cases, pushed the performance envelope for materials of construction past the point of reliable operation. Higher mechanical and tribological stresses and higher temperatures of advanced designs limit the engine designer; advanced materials allow the design of components that may operate reliably at higher stresses and temperatures, thus enabling more efficient engine designs. Advanced materials also offer the opportunity to improve the emissions, NVH, and performance of diesel engines for pickup trucks, vans, and sport utility vehicles.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
On behalf of the Department of Energy's Office of FreedomCAR and Vehicle Technologies, we are pleased to introduce the Fiscal Year (FY) 2004 Annual Progress Report for the Advanced Combustion Engine R&D Sub-Program. The mission of the FreedomCAR and Vehicle Technologies Program is to develop more energy efficient and environmentally friendly highway transportation technologies that enable Americans to use less petroleum for their vehicles. The Advanced Combustion Engine R&D Sub-Program supports this mission by removing the critical technical barriers to commercialization of advanced internal combustion engines for light-, medium-, and heavy-duty highway vehicles that meet future Federal and state emissionsmore » regulations. The primary objective of the Advanced Combustion Engine R&D Sub-Program is to improve the brake thermal efficiency of internal combustion engines from 30 to 45 percent for light-duty applications by 2010; and 40 to 55 percent for heavy-duty applications by 2012; while meeting cost, durability, and emissions constraints. R&D activities include work on combustion technologies that increase efficiency and minimize in-cylinder formation of emissions, as well as aftertreatment technologies that further reduce exhaust emissions. Work is also being conducted on ways to reduce parasitic and heat transfer losses through the development and application of thermoelectrics and turbochargers that include electricity generating capability, and conversion of mechanically driven engine components to be driven via electric motors. This introduction serves to outline the nature, current progress, and future directions of the Advanced Combustion Engine R&D Sub-Program. The research activities of this Sub-Program are planned in conjunction with the FreedomCAR Partnership and the 21st Century Truck Partnership and are carried out in collaboration with industry, national laboratories, and universities. Because of the importance of clean fuels in achieving low emissions, R&D activities are closely coordinated with the relevant activities of the Fuel Technologies Sub-Program, also within the Office of FreedomCAR and Vehicle Technologies. Research is also being undertaken on hydrogen-fueled internal combustion engines to provide an interim hydrogen-based powertrain technology that promotes the longer-range FreedomCAR Partnership goal of transitioning to a hydrogen-fueled transportation system. Hydrogen engine technologies being developed have the potential to provide diesel-like engine efficiencies with near-zero emissions.« less
48 CFR 9904.403-40 - Fundamental requirement.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Fundamental requirement..., OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.403-40 Fundamental requirement. (a)(1) Home office...
78 FR 46326 - Proposed Collection: Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-31
...: Comment Request AGENCY: Office of the Assistant Secretary of Defense for Research and Engineering, DoD... Office of the Assistant Secretary of Defense for Research and Engineering announces a proposed public... following methods: Federal eRulemaking Portal: http://www.regulations.gov . Follow the instructions for...
22. Post Engineer Office, Presidio of San Francisco, Building # ...
22. Post Engineer Office, Presidio of San Francisco, Building # 1049 Letterman General Hospital. Alterations to EKG Cardiology Clinic. November 1963. BUILDING 1049. - Presidio of San Francisco, Letterman General Hospital, Building No. 12, Letterman Hospital Complex, Edie Road, San Francisco, San Francisco County, CA
47 CFR 2.1204 - Import conditions.
Code of Federal Regulations, 2012 CFR
2012-10-01
..., Office of Engineering and Technology, FCC. (iv) Distinctly different models of a product and separate... of units than shown above, written approval must be obtained from the Chief, Office of Engineering... exclusively by the U.S. Government. (7) Three or fewer radio receivers, computers, or other unintentional...
47 CFR 2.1204 - Import conditions.
Code of Federal Regulations, 2013 CFR
2013-10-01
... section, written approval must be obtained from the Chief, Office of Engineering and Technology, FCC; and... approval must be obtained from the Chief, Office of Engineering and Technology, FCC. (iv) Distinctly... fewer radio receivers, computers, or other unintentional radiators as defined in part 15 of this chapter...
47 CFR 2.1204 - Import conditions.
Code of Federal Regulations, 2014 CFR
2014-10-01
... section, written approval must be obtained from the Chief, Office of Engineering and Technology, FCC; and... approval must be obtained from the Chief, Office of Engineering and Technology, FCC. (iv) Distinctly... fewer radio receivers, computers, or other unintentional radiators as defined in part 15 of this chapter...
75 FR 37842 - Notice of Issuance of Regulatory Guide
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-30
... INFORMATION CONTACT: R. A. Jervey, Regulatory Guide Development Branch, Division of Engineering, Office of...) 251-7404 or e-mail [email protected] . SUPPLEMENTARY INFORMATION: I. Introduction The U.S. Nuclear..., Regulatory Guide Development Branch, Division of Engineering, Office of Nuclear Regulatory Research. [FR Doc...
75 FR 43208 - Withdrawal of Regulatory Guide 5.17
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-23
... Engineering, Office of Nuclear Regulatory Research, U.S. Nuclear Regulatory Commission, Washington, DC 20555.... Introduction The U.S. Nuclear Regulatory Commission (NRC) is withdrawing Regulatory Guide 5.17, ``Truck... Development Branch, Division of Engineering, Office of Nuclear Regulatory Research. [FR Doc. 2010-18077 Filed...
19. Photocopy of scaled drawing (from the Engineering Office of ...
19. Photocopy of scaled drawing (from the Engineering Office of the Veterans Administration) originally drawn by Trone, November 9, 1933. Final revisions date December 9, 1957. First floor plan. - Roanoke Veterans Administration Hospital, Building No. 6, 1970 Roanoke Boulevard, Salem, Salem, VA
20. Photocopy of scaled drawing (from the Engineering Office of ...
20. Photocopy of scaled drawing (from the Engineering Office of the Veterans Administration) originally drawn by Trone, November 9, 1933. Final revisions date December 6, 1957. Second floor plan. - Roanoke Veterans Administration Hospital, Building No. 6, 1970 Roanoke Boulevard, Salem, Salem, VA
38. OFFICE OF THE AREA ENGINEER; CAMP McCOY, WISCONSIN; PLAN ...
38. OFFICE OF THE AREA ENGINEER; CAMP McCOY, WISCONSIN; PLAN NUMBER 6150-11-B. CAMP McCOY PROJECT; MOBILIZATION BUILDINGS; CHIMNEY DETAILS. MAY 16, 1942; REVISED TO JUNE 22, 1942. - Fort McCoy, Building T-1129, Sparta, Monroe County, WI
Environmental Management Science Program Workshop. Proceedings
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1998-07-01
The Department of Energy Office of Environmental Management (EM), in partnership with the Office of Energy Research (ER), designed, developed, and implemented the Environmental Management Science Program as a basic research effort to fund the scientific and engineering understanding required to solve the most challenging technical problems facing the government's largest, most complex environmental cleanup program. The intent of the Environmental Management Science Program is to: (1) Provide scientific knowledge that will revolutionize technologies and cleanup approaches to significantly reduce future costs, schedules, and risks. (2) Bridge the gap between broad fundamental research that has wide-ranging applications such as thatmore » performed in the Department's Office of Energy Research and needs-driven applied technology development that is conducted in Environmental Management's Office of Science and Technology. (3) Focus the nation's science infrastructure on critical Department of Energy environmental problems. In an effort to share information regarding basic research efforts being funded by the Environmental Management Science Program and the Environmental Management/Energy Research Pilot Collaborative Research Program (Wolf-Broido Program), this CD includes summaries for each project. These project summaries, available in portable document format (PDF), were prepared in the spring of 1998 by the principal investigators and provide information about their most recent project activities and accomplishments.« less
NASA LaRC Hazardous Material Pharmacy
NASA Technical Reports Server (NTRS)
Esquenet, Remy
1995-01-01
In 1993-1994 the Office of Environmental Engineering contracted SAIC to develop NASA Langley's Pollution Prevention (P2) Program. One of the priority projects identified in this contract was the development of a hazardous waste minimization (HAZMIN)/hazardous materials reutilization (HAZMART) program in the form of a Hazardous Materials Pharmacy. A hazardous materials pharmacy is designed to reduce hazardous material procurement costs and hazardous waste disposal costs. This is accomplished through the collection and reissue of excess hazardous material. Currently, a rarely used hazardous material may be stored in a shop area, unused, until it passes its expiration date. The material is then usually disposed of as a hazardous waste, often at a greater expense than the original cost of the material. While this material was on the shelf expiring, other shop areas may have ordered new supplies of the same material. The hazardous material pharmacy would act as a clearinghouse for such materials. Material that is not going to be used would be turned in to the pharmacy. Other users could then be issued this material free of charge, thereby reducing procurement costs. The use of this material by another shop prevents it from expiring, thereby reducing hazardous waste disposal costs.
48 CFR 9905.505-60 - Illustrations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9905.505-60 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS FOR EDUCATIONAL INSTITUTIONS 9905.505-60 Illustrations. (a) An auditor...
48 CFR 9904.418-60 - Illustrations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.418-60 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.418-60 Illustrations. (a) Business Unit A has various...
48 CFR 9904.409-61 - Interpretation. [Reserved
Code of Federal Regulations, 2010 CFR
2010-10-01
...] 9904.409-61 Section 9904.409-61 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.409-61 Interpretation. [Reserved] ...
48 CFR 9904.407-61 - Interpretation. [Reserved
Code of Federal Regulations, 2010 CFR
2010-10-01
...] 9904.407-61 Section 9904.407-61 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.407-61 Interpretation. [Reserved] ...
48 CFR 9904.406-60 - Illustrations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.406-60 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.406-60 Illustrations. (a) A contractor allocates general management...
48 CFR 9904.405-61 - Interpretation. [Reserved
Code of Federal Regulations, 2010 CFR
2010-10-01
...] 9904.405-61 Section 9904.405-61 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.405-61 Interpretation. [Reserved] ...
48 CFR 9904.401-60 - Illustrations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.401-60 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.401-60 Illustrations. (a) The following examples are illustrative...
48 CFR 9904.405-60 - Illustrations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.405-60 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.405-60 Illustrations. (a) An auditor recommends disallowance of...
48 CFR 9904.410-61 - Interpretation. [Reserved
Code of Federal Regulations, 2010 CFR
2010-10-01
...] 9904.410-61 Section 9904.410-61 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.410-61 Interpretation. [Reserved] ...
48 CFR 9904.404-61 - Interpretation. [Reserved
Code of Federal Regulations, 2010 CFR
2010-10-01
...] 9904.404-61 Section 9904.404-61 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.404-61 Interpretation. [Reserved] ...
48 CFR 9904.408-61 - Interpretation. [Reserved
Code of Federal Regulations, 2010 CFR
2010-10-01
...] 9904.408-61 Section 9904.408-61 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.408-61 Interpretation. [Reserved] ...
48 CFR 9904.404 - Capitalization of tangible assets.
Code of Federal Regulations, 2010 CFR
2010-10-01
... assets. 9904.404 Section 9904.404 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.404 Capitalization of tangible assets. ...
48 CFR 9904.409-60 - Illustrations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.409-60 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.409-60 Illustrations. The following examples are illustrative of...
Coal-fired boiler houses in Cracow present state and possibilities to improve their efficiency
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cyklis, P.; Butcher, T.A.
1995-12-31
A significant amount of heat energy both for heating and process purposes is generated in Cracow, Poland in small-and medium size local boiler houses. The operating procedure of these boiler houses is most often economically and ecologically ineffective because of the bad condition of boilers and lack of funds to install automation, control and measurement equipment. Within the Polish-American Program of Elimination of Low Emission Sources financed by the US Department of Energy, the ENERGOEKSPERT Co., Ltd. investigated chosen boiler houses in Cracow, commissioned by the Cracow Development Office. The results of these investigations were subject of engineering analysis carriedmore » out at the Institute of Industrial Equipment and Power Engineering, Technical University, Cracow. The analysis proved that the low-cost improvement of economic efficiency and reduction of air pollutant emission is feasible for combustion of coal fuels.« less
Code of Federal Regulations, 2014 CFR
2014-10-01
... engineer officer on vessels powered by main propulsion machinery of 750 kW/1,000 HP or more and less than 3,000 kW/4,000 HP propulsion power (management level). 11.331 Section 11.331 Shipping COAST GUARD... officer on vessels powered by main propulsion machinery of 750 kW/1,000 HP or more and less than 3,000 kW...
75 FR 79049 - Notice of Issuance of Regulatory Guide
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-17
..., Division of Engineering, Office of Nuclear Regulatory Research, U.S. Nuclear Regulatory Commission... INFORMATION: I. Introduction The U.S. Nuclear Regulatory Commission (NRC) is issuing a revision to an existing... Development Branch, Division of Engineering, Office of Nuclear Regulatory Research. [FR Doc. 2010-31731 Filed...
7. Photographic copy of floor plan sketch, undated, Selfridge Air ...
7. Photographic copy of floor plan sketch, undated, Selfridge Air National Guard Base Civil Engineers Office in possession of Selfridge Base Civil Engineers Office, Mt. Clemens, Michigan. - Selfridge Field, Building No. 1514, Schoolhouse Road north of South Perimeter Road, Mount Clemens, Macomb County, MI
49 CFR 360.5 - Updating user fees.
Code of Federal Regulations, 2010 CFR
2010-10-01
... updating the cost components comprising the fee. Cost components shall be updated as follows: (1) Direct... determined by the cost study in Regulations Governing Fees For Service, 1 I.C.C. 2d 60 (1984), or subsequent... by total office costs for the office directly associated with user fee activity. Actual updating of...
34 CFR 608.40 - What are allowable costs and what are the limitations on allowable costs?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 34 Education 3 2012-07-01 2012-07-01 false What are allowable costs and what are the limitations on allowable costs? 608.40 Section 608.40 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION STRENGTHENING HISTORICALLY...
34 CFR 608.40 - What are allowable costs and what are the limitations on allowable costs?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 34 Education 3 2014-07-01 2014-07-01 false What are allowable costs and what are the limitations on allowable costs? 608.40 Section 608.40 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION STRENGTHENING HISTORICALLY...
34 CFR 607.30 - What are allowable costs and what are the limitations on allowable costs?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 34 Education 3 2010-07-01 2010-07-01 false What are allowable costs and what are the limitations on allowable costs? 607.30 Section 607.30 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION STRENGTHENING INSTITUTIONS...
34 CFR 608.40 - What are allowable costs and what are the limitations on allowable costs?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 34 Education 3 2011-07-01 2011-07-01 false What are allowable costs and what are the limitations on allowable costs? 608.40 Section 608.40 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION STRENGTHENING HISTORICALLY...
34 CFR 607.30 - What are allowable costs and what are the limitations on allowable costs?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 34 Education 3 2013-07-01 2013-07-01 false What are allowable costs and what are the limitations on allowable costs? 607.30 Section 607.30 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION STRENGTHENING INSTITUTIONS...
34 CFR 609.41 - What are allowable costs and what are the limitations on allowable costs?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 34 Education 3 2012-07-01 2012-07-01 false What are allowable costs and what are the limitations on allowable costs? 609.41 Section 609.41 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION STRENGTHENING HISTORICALLY...
34 CFR 607.30 - What are allowable costs and what are the limitations on allowable costs?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 34 Education 3 2014-07-01 2014-07-01 false What are allowable costs and what are the limitations on allowable costs? 607.30 Section 607.30 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION STRENGTHENING INSTITUTIONS...
34 CFR 609.41 - What are allowable costs and what are the limitations on allowable costs?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 34 Education 3 2011-07-01 2011-07-01 false What are allowable costs and what are the limitations on allowable costs? 609.41 Section 609.41 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION STRENGTHENING HISTORICALLY...
34 CFR 607.30 - What are allowable costs and what are the limitations on allowable costs?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 34 Education 3 2012-07-01 2012-07-01 false What are allowable costs and what are the limitations on allowable costs? 607.30 Section 607.30 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION STRENGTHENING INSTITUTIONS...
34 CFR 609.41 - What are allowable costs and what are the limitations on allowable costs?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 34 Education 3 2014-07-01 2014-07-01 false What are allowable costs and what are the limitations on allowable costs? 609.41 Section 609.41 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION STRENGTHENING HISTORICALLY...
34 CFR 609.41 - What are allowable costs and what are the limitations on allowable costs?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 34 Education 3 2010-07-01 2010-07-01 false What are allowable costs and what are the limitations on allowable costs? 609.41 Section 609.41 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION STRENGTHENING HISTORICALLY...
34 CFR 608.40 - What are allowable costs and what are the limitations on allowable costs?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 34 Education 3 2013-07-01 2013-07-01 false What are allowable costs and what are the limitations on allowable costs? 608.40 Section 608.40 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION STRENGTHENING HISTORICALLY...
34 CFR 607.30 - What are allowable costs and what are the limitations on allowable costs?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 34 Education 3 2011-07-01 2011-07-01 false What are allowable costs and what are the limitations on allowable costs? 607.30 Section 607.30 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION STRENGTHENING INSTITUTIONS...
34 CFR 609.41 - What are allowable costs and what are the limitations on allowable costs?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 34 Education 3 2013-07-01 2013-07-01 false What are allowable costs and what are the limitations on allowable costs? 609.41 Section 609.41 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION STRENGTHENING HISTORICALLY...
7 CFR 3019.45 - Cost and price analysis.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 15 2011-01-01 2011-01-01 false Cost and price analysis. 3019.45 Section 3019.45 Agriculture Regulations of the Department of Agriculture (Continued) OFFICE OF THE CHIEF FINANCIAL OFFICER... Standards § 3019.45 Cost and price analysis. Some form of cost or price analysis shall be made and...
34 CFR 389.41 - What are allowable costs?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 34 Education 2 2011-07-01 2010-07-01 true What are allowable costs? 389.41 Section 389.41 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION... Conditions Must Be Met by a Grantee? § 389.41 What are allowable costs? In addition to those allowable costs...
34 CFR 389.41 - What are allowable costs?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 34 Education 2 2010-07-01 2010-07-01 false What are allowable costs? 389.41 Section 389.41 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION... Conditions Must Be Met by a Grantee? § 389.41 What are allowable costs? In addition to those allowable costs...
48 CFR 9904.405-40 - Fundamental requirement.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Fundamental requirement..., OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.405-40 Fundamental requirement. (a) Costs expressly...
48 CFR 9904.411-60 - Illustrations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.411-60 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.411-60 Illustrations. (a) Contractor “A” has one contract which...
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9905.506-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS FOR EDUCATIONAL INSTITUTIONS 9905.506-20 Purpose. The purpose of this...
48 CFR 9904.412-30 - Definitions.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.412-30 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.412-30 Definitions. (a) The following are definitions of terms...
48 CFR 9904.413-30 - Definitions.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.413-30 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.413-30 Definitions. (a) The following are definitions of terms...
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9905.501-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS FOR EDUCATIONAL INSTITUTIONS 9905.501-20 Purpose. The purpose of this...
48 CFR 9904.410-60 - Illustrations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.410-60 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.410-60 Illustrations. (a) Business Unit A has been including the...
48 CFR 9904.404-63 - Effective date.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-63 Section 9904.404-63 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.404-63 Effective date. (a) This Standard is effective...
48 CFR 9904.403-61 - Interpretation.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-61 Section 9904.403-61 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.403-61 Interpretation. (a) Questions have arisen as to...
48 CFR 9904.408-60 - Illustrations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.408-60 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.408-60 Illustrations. (a) Company A's vacation plan provides that...
48 CFR 9904.409-63 - Effective date.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-63 Section 9904.409-63 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.409-63 Effective date. (a) This Standard is effective...
48 CFR 9904.409-62 - Exemption.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.409-62 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.409-62 Exemption. This Standard shall not apply where compensation...
48 CFR 9904.407-60 - Illustrations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.407-60 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.407-60 Illustrations. (a) Contractor A's written practice is to set...
48 CFR 9904.408-62 - Exemption.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.408-62 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.408-62 Exemption. This Standard shall not apply to contracts and...
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9905.502-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS FOR EDUCATIONAL INSTITUTIONS 9905.502-20 Purpose. The purpose of this...
Low Thrust, Deep Throttling, US/CIS Integrated NTRE
NASA Astrophysics Data System (ADS)
Culver, Donald W.; Kolganov, Vyacheslav; Rochow, Richard F.
1994-07-01
In 1993 our international team performed a follow-on ``Nuclear Thermal Rocket Engine (NTRE) Extended Life Feasibility Assessment'' study for the Nuclear Propulsion Office (NPO) at NASAs Lewis Research Center. The main purpose of this study was to complete the 1992 study matrix to assess NTRE designs at thrust levels of 22.5, 11.3, and 6.8 tonnes, using Commonwealth of Independent States (CIS) reactor technology. An additional Aerojet goal was to continue improving the NTRE concept we had generated. Deep throttling, mission performance optimized engine design parametrics, and reliability/cost enhancing engine system simplifications were studied, because they seem to be the last three basic design improvements sorely needed by post-NERVA NTRE. Deep throttling improves engine life by eliminating damaging thermal and mechanical shocks caused by after-cooling with pulsed coolant flow. Alternately, it improves mission performance with steady flow after-cooling by minimizing reactor over-cooling. Deep throttling also provides a practical transition from high pressures and powers of the high thrust power cycle to the low pressures and powers of our electric power generating mode. Two deep throttling designs are discussed; a workable system that was studied and a simplified system that is recommended for future study. Mission-optimized engine thrust/weight (T/W) and Isp predictions are included along with system flow schemes and concept sketches.
Hysteroscopic polypectomy prior to infertility treatment: A cost analysis and systematic review.
Mouhayar, Youssef; Yin, Ophelia; Mumford, Sunni L; Segars, James H
2017-06-01
The cost of fertility treatment is expensive and interventions that reduce cost can lead to greater efficiency and fewer embryos transferred. Endometrial polyps contribute to infertility and are frequently removed prior to infertility treatment. It is unclear whether polypectomy reduces fertility treatment cost and if so, the magnitude of cost reduction afforded by the procedure. The aim of this study was to determine whether performing office or operative hysteroscopic polypectomy prior to infertility treatment would be cost-effective. PubMed, Embase, and Cochrane libraries were used to identify publications reporting pregnancy rates after hysteroscopic polypectomy. Studies were required to have a polypectomy treatment group and control group of patients with polyps that were not resected. The charges of infertility treatments and polypectomy were obtained through infertility organizations and a private healthcare cost reporting website. These charges were applied to a decision tree model over the range of pregnancy rates observed in the representative studies to calculate an average cost per clinical or ongoing pregnancy. A sensitivity analysis was conducted to assess cost savings of polypectomy over a range of pregnancy rates and polypectomy costs. Pre-treatment office or operative hysteroscopic polypectomy ultimately saved €6658 ($7480) and €728 ($818), respectively, of the average cost per clinical pregnancy in women treated with four cycles of intrauterine insemination. Polypectomy prior to intrauterine insemination was cost-effective for clinical pregnancy rates greater than 30.2% for office polypectomy and 52.6% for operative polypectomy and for polypectomy price <€4414 ($4959). Office polypectomy or operative polypectomy saved €15,854 ($17,813) and €6644 ($7465), respectively, from the average cost per ongoing pregnancy for in vitro fertilization/intracytoplasmic sperm injection treated women and was cost-effective for ongoing pregnancy rates greater than 26.4% (office polypectomy) and 31.7% (operative polypectomy) and polypectomy price <€6376 ($7164). These findings suggested that office or operative hysteroscopic polypectomy was cost-effective when performed prior to both intrauterine insemination and in vitro fertilization over a range of plausible pregnancy rates and procedural costs. Copyright © 2017 Elsevier B.V. All rights reserved.
Testicular self-examination and testicular cancer: a cost-utility analysis.
Aberger, Michael; Wilson, Bradley; Holzbeierlein, Jeffrey M; Griebling, Tomas L; Nangia, Ajay K
2014-12-01
The United States Preventive Services Task Force (USPSTF) has recommended against testicular self-examinations (TSE) or clinical examination for testicular cancer screening. However, in this recommendation there was no consideration of the significant fiscal cost of treating advanced disease versus evaluation of benign disease. In this study, a cost-utility validation for TSE was performed. The cost of treatment for an advanced-stage testicular tumor (both seminomatous and nonseminomatous) was compared to the cost of six other scenarios involving the clinical assessment of a testicular mass felt during self-examination (four benign and two early-stage malignant). Medicare reimbursements were used as an estimate for a national cost standard. The total treatment cost for an advanced-stage seminoma ($48,877) or nonseminoma ($51,592) equaled the cost of 313-330 benign office visits ($156); 180-190 office visits with scrotal ultrasound ($272); 79-83 office visits with serial scrotal ultrasounds and labs ($621); 6-7 office visits resulting in radical inguinal orchiectomy for benign pathology ($7,686) or 2-3 office visits resulting in treatment and surveillance of an early-stage testicular cancer ($17,283: seminoma, $26,190: nonseminoma). A large number of clinical evaluations based on the TSE for benign disease can be made compared to the cost of one missed advanced-stage tumor. An average of 2.4 to 1 cost benefit ratio was demonstrated for early detected testicular cancer versus advanced-stage disease. © 2014 The Authors. Cancer Medicine published by John Wiley & Sons Ltd.
48 CFR 31.205-25 - Manufacturing and production engineering costs.
Code of Federal Regulations, 2013 CFR
2013-10-01
... production engineering costs. 31.205-25 Section 31.205-25 Federal Acquisition Regulations System FEDERAL... Commercial Organizations 31.205-25 Manufacturing and production engineering costs. (a) The costs of manufacturing and production engineering effort as described in (1) through (4) below are all allowable: (1...
48 CFR 31.205-25 - Manufacturing and production engineering costs.
Code of Federal Regulations, 2014 CFR
2014-10-01
... production engineering costs. 31.205-25 Section 31.205-25 Federal Acquisition Regulations System FEDERAL... Commercial Organizations 31.205-25 Manufacturing and production engineering costs. (a) The costs of manufacturing and production engineering effort as described in (1) through (4) below are all allowable: (1...
48 CFR 31.205-25 - Manufacturing and production engineering costs.
Code of Federal Regulations, 2012 CFR
2012-10-01
... production engineering costs. 31.205-25 Section 31.205-25 Federal Acquisition Regulations System FEDERAL... Commercial Organizations 31.205-25 Manufacturing and production engineering costs. (a) The costs of manufacturing and production engineering effort as described in (1) through (4) below are all allowable: (1...
48 CFR 31.205-25 - Manufacturing and production engineering costs.
Code of Federal Regulations, 2011 CFR
2011-10-01
... production engineering costs. 31.205-25 Section 31.205-25 Federal Acquisition Regulations System FEDERAL... Commercial Organizations 31.205-25 Manufacturing and production engineering costs. (a) The costs of manufacturing and production engineering effort as described in (1) through (4) below are all allowable: (1...
48 CFR 31.205-25 - Manufacturing and production engineering costs.
Code of Federal Regulations, 2010 CFR
2010-10-01
... production engineering costs. 31.205-25 Section 31.205-25 Federal Acquisition Regulations System FEDERAL... Commercial Organizations 31.205-25 Manufacturing and production engineering costs. (a) The costs of manufacturing and production engineering effort as described in (1) through (4) below are all allowable: (1...
... Executive Secretariat Staff - 08E86 Office of the Director/Public Affairs Staff - 08E73 Office of Direct Service and Contracting Tribes - 08E17 Office of Environmental Health and Engineering - 10N14C Office of Finance and Accounting - 10E54 Office of Human Resources - 11E53A ...
... Executive Secretariat Staff - 08E86 Office of the Director/Public Affairs Staff - 08E73 Office of Direct Service and Contracting Tribes - 08E17 Office of Environmental Health and Engineering - 10N14C Office of Finance and Accounting - 10E54 Office of Human Resources - 11E53A ...
... Executive Secretariat Staff - 08E86 Office of the Director/Public Affairs Staff - 08E73 Office of Direct Service and Contracting Tribes - 08E17 Office of Environmental Health and Engineering - 10N14C Office of Finance and Accounting - 10E54 Office of Human Resources - 11E53A ...
... Executive Secretariat Staff - 08E86 Office of the Director/Public Affairs Staff - 08E73 Office of Direct Service and Contracting Tribes - 08E17 Office of Environmental Health and Engineering - 10N14C Office of Finance and Accounting - 10E54 Office of Human Resources - 11E53A ...
76 FR 50275 - Guidance for the Assessment of Beyond-Design-Basis Aircraft Impacts
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-12
...: Mekonen M. Bayssie, Regulatory Guide Development Branch, Division of Engineering, Office of Nuclear... e-mail to [email protected] . SUPPLEMENTARY INFORMATION: I. Introduction The Nuclear..., Division of Engineering, Office of Nuclear Regulatory Research. [FR Doc. 2011-20513 Filed 8-11-11; 8:45 am...
78 FR 7430 - Sunshine Act Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-01
... at 10:30 a.m. in Room TW-C305, at 445 12th Street SW., Washington, DC. 1 Office of Engineering... Review of Telecommunications Regulations--Part 2 Administered by the Office of Engineering and Technology... accelerate innovation and promote the introduction of new products, including medical devices, to the...
75 FR 16525 - Notice of Issuance of Regulatory Guide
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-01
... CONTACT: Mekonen M. Bayssie, Regulatory Guide Development Branch, Division of Engineering, Office of...) 251-7489 or e-mail [email protected] . SUPPLEMENTARY INFORMATION: I. Introduction The U.S..., Division of Engineering, Office of Nuclear Regulatory Research. [FR Doc. 2010-7391 Filed 3-31-10; 8:45 am...
17. Photocopy of scaled drawing (from the Engineering Office of ...
17. Photocopy of scaled drawing (from the Engineering Office of the Veterans Administration) drawn by Ayars, November 9, 1933. Original drawings of the northwest and southwest elevations with details of roof and lobbies. - Roanoke Veterans Administration Hospital, Building No. 6, 1970 Roanoke Boulevard, Salem, Salem, VA
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-02
... OFFICE OF SCIENCE AND TECHNOLOGY POLICY National Nanotechnology Coordination Office, Nanoscale... Technology; The National Nanotechnology Initiative (NNI) Strategic Planning Stakeholder Workshop: Public Meeting ACTION: Notice of public meeting. SUMMARY: The National Nanotechnology Coordination Office (NNCO...
48 CFR 9904.407-40 - Fundamental requirement.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Fundamental requirement..., OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.407-40 Fundamental requirement. Standard costs may be...
48 CFR 9904.404-40 - Fundamental requirement.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Fundamental requirement..., OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.404-40 Fundamental requirement. (a) The acquisition cost...
48 CFR 9904.402-40 - Fundamental requirement.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Fundamental requirement..., OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.402-40 Fundamental requirement. All costs incurred for...
48 CFR 9904.417-40 - Fundamental requirement.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Fundamental requirement..., OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.417-40 Fundamental requirement. The cost of money...
48 CFR 9904.408-40 - Fundamental requirement.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Fundamental requirement..., OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.408-40 Fundamental requirement. (a) The costs of...
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.415-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.415-20 Purpose. (a) The purpose of this Standard 9904.415 is to...
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.408-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.408-20 Purpose. The purpose of this Standard is to improve, and...
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.412-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.412-20 Purpose. (a) The purpose of this Standard 9904.412 is to...
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.409-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.409-20 Purpose. The purpose of this Standard is to provide criteria...
48 CFR 9904.403-50 - Techniques for application.
Code of Federal Regulations, 2010 CFR
2010-10-01
.... 9904.403-50 Section 9904.403-50 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.403-50 Techniques for application. (a)(1) Separate...
48 CFR 9904.403-63 - Effective date.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-63 Section 9904.403-63 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.403-63 Effective date. This Standard is effective as of...
48 CFR 9904.408-63 - Effective date.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-63 Section 9904.408-63 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.408-63 Effective date. This Standard is effective as of...
48 CFR 9904.401-63 - Effective date.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-63 Section 9904.401-63 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.401-63 Effective date. This Standard is effective as of...
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.402-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.402-20 Purpose. The purpose of this standard is to require that...
48 CFR 9904.407-63 - Effective date.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-63 Section 9904.407-63 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.407-63 Effective date. This Standard is effective as of...
48 CFR 9904.405-63 - Effective date.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-63 Section 9904.405-63 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.405-63 Effective date. This Standard is effective as of...
48 CFR 9904.402-63 - Effective date.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-63 Section 9904.402-63 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.402-63 Effective date. This Standard is effective as of...
48 CFR 9904.406-63 - Effective date.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-63 Section 9904.406-63 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.406-63 Effective date. This Standard is effective as of...
48 CFR 9904.401-50 - Techniques for application.
Code of Federal Regulations, 2010 CFR
2010-10-01
.... 9904.401-50 Section 9904.401-50 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.401-50 Techniques for application. (a) The standard...
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9903.201-6 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING... remain in compliance. (2) Required change means a change in cost accounting practice that a contractor is...
Code of Federal Regulations, 2010 CFR
2010-10-01
... the applicability of the Cost Accounting Standards for a contract or subcontract with a value of less... 9903.201-5 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS...
Conversion of the Defense Communications System from Analog to Digital Form.
1974-06-01
Hjr,.nZing of Mail: Transmission Methods, Report R-69-046-5, Prepared for Bureau of Research and Engineering, Post Office Department, Washington (July...Transmission Methods, Report R-69-046-5, Prepared for Bureau of Research and 165 Engineerin-, Post Office Department, Washington (July 1970), P. 3-5. 3...Prepared for Bureau of Research and Engineering, Post Office Department Washington . July 1970. Df-AG" 5M ARMY COMMAND AND SENERAL STAFF COLL FORT
77 FR 18742 - Copyright Office Fees
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-28
... would recover a significant part of the costs to the Office for services that benefit both copyright owners and the public, and provide full cost recovery for many services which benefit only or primarily... public by creating a more robust public record. The Office therefore sees a clear benefit to offering a...
Code of Federal Regulations, 2013 CFR
2013-10-01
... defense officer. If the award recipient is a law enforcement officer, then such cost shall be borne by the... FIRE PREVENTION AND CONTROL PUBLIC SAFETY AWARDS TO PUBLIC SAFETY OFFICERS § 150.9 Funding. (a) President's Award. The costs involved in designing and striking the medal to be presented in conjunction...
Code of Federal Regulations, 2012 CFR
2012-10-01
... defense officer. If the award recipient is a law enforcement officer, then such cost shall be borne by the... FIRE PREVENTION AND CONTROL PUBLIC SAFETY AWARDS TO PUBLIC SAFETY OFFICERS § 150.9 Funding. (a) President's Award. The costs involved in designing and striking the medal to be presented in conjunction...
Code of Federal Regulations, 2014 CFR
2014-10-01
... defense officer. If the award recipient is a law enforcement officer, then such cost shall be borne by the... FIRE PREVENTION AND CONTROL PUBLIC SAFETY AWARDS TO PUBLIC SAFETY OFFICERS § 150.9 Funding. (a) President's Award. The costs involved in designing and striking the medal to be presented in conjunction...
77 FR 1743 - Discount Rates for Cost-Effectiveness Analysis of Federal Programs
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-11
... OFFICE OF MANAGEMENT AND BUDGET Discount Rates for Cost-Effectiveness Analysis of Federal Programs AGENCY: Office of Management and Budget. ACTION: Revisions to Appendix C of OMB Circular A-94. SUMMARY: The Office of Management and Budget revised Circular A-94 in 1992. The revised Circular specified...
New teaching methods in use at UC Irvine's optical engineering and instrument design programs
NASA Astrophysics Data System (ADS)
Silberman, Donn M.; Rowe, T. Scott; Jo, Joshua; Dimas, David
2012-10-01
New teaching methods reach geographically dispersed students with advances in Distance Education. Capabilities include a new "Hybrid" teaching method with an instructor in a classroom and a live WebEx simulcast for remote students. Our Distance Education Geometric and Physical Optics courses include Hands-On Optics experiments. Low cost laboratory kits have been developed and YouTube type video recordings of the instructor using these tools guide the students through their labs. A weekly "Office Hour" has been developed using WebEx and a Live Webcam the instructor uses to display his live writings from his notebook for answering students' questions.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Anthony D. Rollett; Hasso Weiland; Mohammed Alvi
Carnegie Mellon University was teamed with the Alcoa Technical Center with support from the US Dept. of Energy (Office of Industrial Technology) and the Pennsylvania Technology Investment Authority (PTIA) to make processing of aluminum less costly and more energy efficient. Researchers in the Department of Materials Science and Engineering have investigated how annealing processes in the early stages of aluminum processing affect the structure and properties of the material. Annealing at high temperatures consumes significant amounts of time and energy. By making detailed measurements of the crystallography and morphology of internal structural changes they have generated new information that willmore » provide a scientific basis for shortening processing times and consuming less energy during annealing.« less
Cost-effectiveness analysis of a patient-centered care model for management of psoriasis.
Parsi, Kory; Chambers, Cindy J; Armstrong, April W
2012-04-01
Cost-effectiveness analyses help policymakers make informed decisions regarding funding allocation of health care resources. Cost-effectiveness analysis of technology-enabled models of health care delivery is necessary to assess sustainability of novel online, patient-centered health care models. We sought to compare cost-effectiveness of conventional in-office care with a patient-centered, online model for follow-up treatment of patients with psoriasis. Cost-effectiveness analysis was performed from a societal perspective on a randomized controlled trial comparing a patient-centered online model with in-office visits for treatment of patients with psoriasis during a 24-week period. Quality-adjusted life expectancy was calculated using the life table method. Costs were generated from the original study parameters and national averages for salaries and services. No significant difference existed in the mean change in Dermatology Life Quality Index scores between the two groups (online: 3.51 ± 4.48 and in-office: 3.88 ± 6.65, P value = .79). Mean improvement in quality-adjusted life expectancy was not significantly different between the groups (P value = .93), with a gain of 0.447 ± 0.48 quality-adjusted life years for the online group and a gain of 0.463 ± 0.815 quality-adjusted life years for the in-office group. The cost of follow-up psoriasis care with online visits was 1.7 times less than the cost of in-person visits ($315 vs $576). Variations in travel time existed among patients depending on their distance from the dermatologist's office. From a societal perspective, the patient-centered online care model appears to be cost saving, while maintaining similar effectiveness to standard in-office care. Copyright © 2011 American Academy of Dermatology, Inc. Published by Mosby, Inc. All rights reserved.
Mendez, Bernardino M; Chiodo, Michael V; Patel, Parit A
2015-07-01
Virtual surgical planning using three-dimensional (3D) printing technology has improved surgical efficiency and precision. A limitation to this technology is that production of 3D surgical models requires a third-party source, leading to increased costs (up to $4000) and prolonged assembly times (averaging 2-3 weeks). The purpose of this study is to evaluate the feasibility, cost, and production time of customized skull models created by an "in-office" 3D printer for craniofacial reconstruction. Two patients underwent craniofacial reconstruction with the assistance of "in-office" 3D printing technology. Three-dimensional skull models were created from a bioplastic filament with a 3D printer using computed tomography (CT) image data. The cost and production time for each model were measured. For both patients, a customized 3D surgical model was used preoperatively to plan split calvarial bone grafting and intraoperatively to more efficiently and precisely perform the craniofacial reconstruction. The average cost for surgical model production with the "in-office" 3D printer was $25 (cost of bioplastic materials used to create surgical model) and the average production time was 14 hours. Virtual surgical planning using "in office" 3D printing is feasible and allows for a more cost-effective and less time consuming method for creating surgical models and guides. By bringing 3D printing to the office setting, we hope to improve intraoperative efficiency, surgical precision, and overall cost for various types of craniofacial and reconstructive surgery.
NASA Technical Reports Server (NTRS)
Buttler, Jennifer A.
2004-01-01
The program for which I am working at this summer is Propulsion and Power/Low Emissions Alternative Power (P&P/LEAP). It invests in a fundamental TRL 1-6 research and technology portfolio that will enable the future of: Alternative fuels and/or alternative propulsion systems, non-combustion (electric) propulsion systems. P&P/LEAP will identify and capitalize on the highest potential concepts generated both internal and external to the Agency. During my 2004 summer at NASA Glenn Research Center, I worked with my mentor Barbara Mader, in the Project Office with the Business Team completing various tasks for the project and personnel. The LEAP project is a highly matrixed organization. The Project Office is responsible for the goals advocacy and dollar (budget) of the LEAP project. The objectives of the LEAP Project are to discover new energy sources and develop unconventional engines and power systems directed towards greatly reduced emissions, enable new vehicle concepts for public mobility, new science missions and national security. The Propulsion and PowerLow Emissions Alternative Power directly supports the environmental, mobility, national security objectives of the Vehicle Systems Program and the Aeronautics Technology Theme. Technology deliverables include the demonstration through integrated ground tests, a constant volume combustor in an engine system, and UAV/small transport aircraft all electric power system. My mentor serves as a key member of the management team for the Aeropropulsion Research Program Office (ARPO). She has represented the office on numerous occasions, and is a member of a number of center-wide panels/teams, such as the Space management Committee and is chair to the Business Process Consolidation Team. She is responsible for the overall coordination of resources for the Propulsion and Power Project - from advocacy to implementation. The goal for my summer at NASA was to document processes and archive program documents from the past years. I used the computer and office machines, and also worked with personnel in setting up a Cost Estimation Plan. I gained office experience in Word, Excel, and Power Point, with the completion of a variety of tasks. I made spreadsheets that pertained to the budget plan for Journey to Tomorrow, to name a few I have supported the office by tracking resource information: including programmatic travel, project budget at the center level to budgets for individual research sub-projects and grants. I also assisted the Program Support Office in their duties including, representing the office on numerous occasions on center-wide team/panels, such as the Space management committee, IFMP Budget Formulation, Journey to Tomorrow Committee, and the Vehicle Systems Program Business Process Team.
Code of Federal Regulations, 2010 CFR
2010-10-01
... which meet the definition of âchange to a cost accounting practice.â 9903.302-3 Section 9903.302-3 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS CONTRACT...
The Hidden Costs of Part-Time Faculty.
ERIC Educational Resources Information Center
Nance, Guinevera; Culverhouse, Renee
1992-01-01
As colleges face budget reductions, they must consider the substantial hidden costs of unemployment benefits for terminated part-time faculty. Planning a sound program of benefits management that includes cost containment requires the cooperation of personnel director, chief financial officer, and chief academic officer. (MSE)
7 CFR 3015.51 - Acceptable contributions and costs.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 15 2010-01-01 2010-01-01 false Acceptable contributions and costs. 3015.51 Section 3015.51 Agriculture Regulations of the Department of Agriculture (Continued) OFFICE OF THE CHIEF FINANCIAL OFFICER, DEPARTMENT OF AGRICULTURE UNIFORM FEDERAL ASSISTANCE REGULATIONS Cost-Sharing or Matching...
48 CFR 1552.242-72 - Financial administrative contracting officer.
Code of Federal Regulations, 2011 CFR
2011-10-01
...) Negotiate advance agreements applicable to treatment of costs and to Independent Research & Development/Bid and Proposal costs. (3) Negotiate changes to interim billing rates and establish final indirect cost... contracting officer. 1552.242-72 Section 1552.242-72 Federal Acquisition Regulations System ENVIRONMENTAL...
48 CFR 9904.405-50 - Techniques for application.
Code of Federal Regulations, 2010 CFR
2010-10-01
.... 9904.405-50 Section 9904.405-50 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.405-50 Techniques for application. (a) The detail and...
Cost estimating Brayton and Stirling engines
NASA Technical Reports Server (NTRS)
Fortgang, H. R.
1980-01-01
Brayton and Stirling engines were analyzed for cost and selling price for production quantities ranging from 1000 to 400,000 units per year. Parts and components were subjected to indepth scrutiny to determine optimum manufacturing processes coupled with make or buy decisions on materials and small parts. Tooling and capital equipment costs were estimated for each detail and/or assembly. For low annual production volumes, the Brayton engine appears to have a lower cost and selling price than the Stirling Engine. As annual production quantities increase, the Stirling becomes a lower cost engine than the Brayton. Both engines could benefit cost wise if changes were made in materials, design and manufacturing process as annual production quantities increase.
User needs as a basis for advanced technology. [U.S. civil space program
NASA Technical Reports Server (NTRS)
Mankins, John C.; Reck, Gregory M.
1992-01-01
The NASA Integrated Technology Plan (ITP) is described with treatment given to the identification of U.S. technology needs, space research and technology programs, and some ITP implementations. The ITP is based on the development and transfer of technologies relevant to the space program that also have significant implications for general technological research. Among the areas of technological research identified are: astrophysics, earth sciences, microgravity, and space physics. The Office of Space Science and Applications prioritizes the technology needs in three classes; the highest priority is given to submm and microwave technologies for earth sciences and astrophysics study. Other government and commercial needs are outlined that include cryogenic technologies, low-cost engines, advanced data/signal processing, and low-cost ELVs. It is demonstrated that by identifying and addressing these areas of user technology needs NASA's research and technology program can enhance U.S. trade and industrial competitiveness.
2015-06-01
Martial Arts Program MCRD Marine Corps Recruit Depot PCO Property Control Office PSC permanent change of station PSE personnel support...office supplies and materials required for the operations office to function. The Property Control Office ( PCO ) is another cost under the base...operations subcategory. PCO supports the Marines with non-deployable equipment. PCO Garrison Property, PSE, collateral equipment (CE) and food preparation
NASA Technical Reports Server (NTRS)
Barisa, B. B.; Flinchbaugh, G. D.; Zachary, A. T.
1989-01-01
This paper compares the cost of the Space Shuttle Main Engine (SSME) and the Space Transportation Main Engine (STME) proposed by the Advanced Launch System Program. A brief description of the SSME and STME engines is presented, followed by a comparison of these engines that illustrates the impact of focusing on acceptable performance at minimum cost (as for the STME) or on maximum performance (as for the SSME). Several examples of cost reduction methods are presented.
Bidassie, Balmatee; McGlothlin, James D; Goh, Alina; Feyen, Robert G; Barany, James W
2010-05-01
The objective of this research was to evaluate the effectiveness and provide a limited economic evaluation of an office ergonomics program at a major university from 1995 to 2007. The relationship between office-related recordable injuries, reported lost time, severity of these injuries, and the Workers' Compensation (WC) paid was analyzed and the corresponding incident cost was calculated. Two major datasets analyzed were OSHA 200/300 logs (1991-2007) and WC claims paid (1999-2007). Since the beginning of the office ergonomics program in 1995 and through 2007 (13-year period), the number of office cumulative trauma disorder (CTD) cases decreased by 53%. Since the official start (in 1999) of a 50-50 cost share agreement for office equipment purchases between the university's Safety and Health Department (SHD) and the university departments evaluated, it was observed that the incident rate decreased by 63%, Total Days Away/restrict or Transfer (DART) rate decreased by 41%, Lost Time Case (LTC) rate decreased by 71% and office-related carpal tunnel syndrome decreased by almost 50%. The long-term goal of this research is to demonstrate the self-sustainability of an office ergonomics program by showing that equipment costs are eventually offset by a decrease in WC claims paid and lost time from office-related injuries and illnesses. While limited, this research helps in cost-justifying the implementation of future office ergonomics programs for large organizations. Copyright (c) 2009 Elsevier Ltd. All rights reserved.
48 CFR 48.104-4 - Sharing alternative-no-cost settlement method.
Code of Federal Regulations, 2010 CFR
2010-10-01
... contract, the contracting officer shall analyze the different approaches available to determine which one... the contracting officer's judgment, reliance on other VECP approaches likely would not be more cost-effective, and the no-cost settlement would provide adequate consideration to the Government. Under this...
48 CFR 48.104-4 - Sharing alternative-no-cost settlement method.
Code of Federal Regulations, 2011 CFR
2011-10-01
... contract, the contracting officer shall analyze the different approaches available to determine which one... the contracting officer's judgment, reliance on other VECP approaches likely would not be more cost-effective, and the no-cost settlement would provide adequate consideration to the Government. Under this...
34 CFR 675.46 - Unallowable costs.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 34 Education 3 2010-07-01 2010-07-01 false Unallowable costs. 675.46 Section 675.46 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION FEDERAL WORK-STUDY PROGRAMS Work-Colleges Program § 675.46 Unallowable costs. An...
48 CFR 9904.410-50 - Techniques for application.
Code of Federal Regulations, 2010 CFR
2010-10-01
.... 9904.410-50 Section 9904.410-50 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.410-50 Techniques for application. (a) G&A expenses of a...
48 CFR 9904.402-50 - Techniques for application.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.402-50 Techniques for application. (a) The Fundamental...
ETR, TRA642. ELEVATIONS. METAL SIDING. OFFICE BUILDING (TRA647) AND ELECTRICAL ...
ETR, TRA-642. ELEVATIONS. METAL SIDING. OFFICE BUILDING (TRA-647) AND ELECTRICAL BUILDING (TRA-648) ATTACHED. KAISER ETR-5528-MTR-642-A-11, 11/1955. INL INDEX NO. 532-0642-00-486-100919, REV. 3. - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
76 FR 14009 - Federal Advisory Committee Act; Technological Advisory Council
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-15
... are also broadcast live with open captioning over the internet from the FCC Live Web page at http... accommodations should be submitted via e-mail to [email protected] or by calling the Office of Engineering and... impossible to fill. Federal Communications Commission Julius P. Knapp, Chief, Office of Engineering and...
6. A VIEW TOWARD THE EAST SIDE OF BUILDING NO. ...
6. A VIEW TOWARD THE EAST SIDE OF BUILDING NO. 1, SHOWING THE OFFICE SECTION AT THE SOUTHEAST CORNER. BUILDING NO. 18 (ENGINEERING BUILDING) IS VISIBLE IN THE CENTER DISTANCE, AND BUILDING NO. 12 (OFFICE/SUBSTATION) AT THE RIGHT. - United Engineering Company Shipyard, 2900 Main Street, Alameda, Alameda County, CA
15. Photocopy of scaled drawing (from the Engineering Office of ...
15. Photocopy of scaled drawing (from the Engineering Office of the Veterans Administration) drawn by A.B. Metcalf, issued February 5, 1935). Tree planting plan of R-VAH site, showing Building #6 in relation to its surroundings. - Roanoke Veterans Administration Hospital, Building No. 6, 1970 Roanoke Boulevard, Salem, Salem, VA
Expedition 11 Science Officer and Flight Engineer John Phillips in Node 1/Unity
2005-04-17
ISS011-E-05161 (17 April 2005) --- Astronaut John L. Phillips, Expedition 11 NASA ISS science officer and flight engineer, uses the ISS wet/dry vacuum cleaner assembly to catch floating debris from the top of a food can in the Unity node of the International Space Station (ISS).
46 CFR 11.323 - STCW engineer officer endorsements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... turbine-propelled vessels as appropriate. (2) STCW engineer officer endorsements issued in accordance with §§ 11.325, 11.327, 11.329, 11.331, 11.333, and 11.335 of this subpart for motor or gas turbine-propelled..., distilling plants, oily water separators, or sewage treatment plants. An applicant may qualify for removal of...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-28
... submittals for consistency with the requirements of Office of Management and Budget's (OMB) Cost Principles... classes (Basic Financial Assistance and Cost Principles--see the Acquisition Career Management Program... not provided from the National Environmental Policy Act (NEPA) or the Office of Management and Budget...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-22
... OFFICE OF MANAGEMENT AND BUDGET Calendar Year 2013 Cost of Outpatient Medical, Dental, and... Regarding Recovery From Tortiously Liable Third Persons AGENCY: Office of Management and Budget, Executive... Office of Management and Budget (OMB) by the President through Executive Order No. 11541 of July 1, 1970...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-26
... OFFICE OF MANAGEMENT AND BUDGET Technical Support Document: Technical Update of the Social Cost of... Budget, Executive Office of the President. ACTION: Notice of availability and request for comments. SUMMARY: The Office of Management and Budget (OMB) requests comments on the Technical Support Document...
26 CFR 1.263A-1 - Uniform capitalization of costs.
Code of Federal Regulations, 2014 CFR
2014-04-01
... or facilities. (P) Engineering and design costs. Engineering and design costs include pre-production costs, such as costs attributable to research, experimental, engineering, and design activities (to the... customer demand. (9) Research and experimental expenditures. See section 263A(c)(2) for an exception for...
The common engine concept for ALS application - A cost reduction approach
NASA Technical Reports Server (NTRS)
Bair, E. K.; Schindler, C. M.
1989-01-01
Future launch systems require the application of propulsion systems which have been designed and developed to meet mission model needs while providing high degrees of reliability and cost effectiveness. Vehicle configurations which utilize different propellant combinations for booster and core stages can benefit from a common engine approach where a single engine design can be configured to operate on either set of propellants and thus serve as either a booster or core engine. Engine design concepts and mission application for a vehicle employing a common engine are discussed. Engine program cost estimates were made and cost savings, over the design and development of two unique engines, estimated.
Healthy Weight for Life: Actions for Communities, Individuals, and Families
... Executive Secretariat Staff - 08E86 Office of the Director/Public Affairs Staff - 08E73 Office of Direct Service and Contracting Tribes - 08E17 Office of Environmental Health and Engineering - 10N14C Office of Finance and Accounting - 10E54 Office of Human Resources - 11E53A ...
34 CFR 674.47 - Costs chargeable to the Fund.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 34 Education 3 2011-07-01 2011-07-01 false Costs chargeable to the Fund. 674.47 Section 674.47 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION FEDERAL PERKINS LOAN PROGRAM Due Diligence § 674.47 Costs chargeable to...
48 CFR 52.216-7 - Allowable Cost and Payment.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Cost and Payment (JUN 2011) (a) Invoicing. (1) The Government will make payments to the Contractor when... make interim payments for contract financing on the ____[Contracting Officer insert day as prescribed... office is not compelled to make payment by the specified due date. (b) Reimbursing costs. (1) For the...
48 CFR 52.216-7 - Allowable Cost and Payment.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Cost and Payment (JUN 2013) (a) Invoicing. (1) The Government will make payments to the Contractor when... make interim payments for contract financing on the ____[Contracting Officer insert day as prescribed... office is not compelled to make payment by the specified due date. (b) Reimbursing costs. (1) For the...
48 CFR 52.216-7 - Allowable Cost and Payment.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Cost and Payment (JUN 2013) (a) Invoicing. (1) The Government will make payments to the Contractor when... make interim payments for contract financing on the ____[Contracting Officer insert day as prescribed... office is not compelled to make payment by the specified due date. (b) Reimbursing costs. (1) For the...
Advanced General Aviation Turbine Engine (GATE) concepts
NASA Technical Reports Server (NTRS)
Lays, E. J.; Murray, G. L.
1979-01-01
Concepts are discussed that project turbine engine cost savings through use of geometrically constrained components designed for low rotational speeds and low stress to permit manufacturing economies. Aerodynamic development of geometrically constrained components is recommended to maximize component efficiency. Conceptual engines, airplane applications, airplane performance, engine cost, and engine-related life cycle costs are presented. The powerplants proposed offer encouragement with respect to fuel efficiency and life cycle costs, and make possible remarkable airplane performance gains.
77 FR 1009 - Airworthiness Directives; Turbomeca Turboshaft Engines
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-09
... Directives; Turbomeca Turboshaft Engines AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Final... the Federal Register. That AD applies to Turbomeca Arriel 1 series turboshaft engines. The AD number...: Frederick Zink, Aerospace Engineer, Engine Certification Office, FAA, 12 New England Executive Park...
47 CFR 0.5 - General description of Commission organization and operations.
Code of Federal Regulations, 2010 CFR
2010-10-01
.... (8) Office of Communications Business Opportunities. (9) Office of Administrative Law Judges. (10... and operations. 0.5 Section 0.5 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMISSION... Engineering and Technology. (3) Office of General Counsel. (4) Office of Strategic Planning and Policy...
Counterfeit Parts: DOD Needs to Improve Reporting and Oversight to Reduce Supply Chain Risk
2016-02-01
the cost accounting standards board under 41 U.S.C. § 1502. 8DOD implemented its cost principle that costs are not allowable unless 1) the...February 2016 GAO-16-236 United States Government Accountability Office United States Government Accountability Office Highlights of GAO-16-236, a...apply to prime contractors subject to cost accounting standards on acquisitions other than small business set-asides. The cost accounting standards are
Flight and Integrated Testing: Blazing the Trail for the Ares Launch Vehicles
NASA Technical Reports Server (NTRS)
Taylor, James L.; Cockrell, Charlie; Robinson, Kimberly; Tuma, Margaret L.; Flynn, Kevin C.; Briscoe, Jeri M.
2007-01-01
It has been 30 years since the United States last designed and built a human-rated launch vehicle. The National Aeronautics and Space Administration (NASA) has marshaled unique resources from the government and private sectors that will carry the next generation of astronauts into space safer and more efficiently than ever and send them to the Moon to develop a permanent outpost. NASA's Flight and Integrated Test Office (FITO) located at Marshall Space Flight Center and the Ares I-X Mission Management Office have primary responsibility for developing and conducting critical ground and flight tests for the Ares I and Ares V launch vehicles. These tests will draw upon Saturn and the Space Shuttle experiences, which taught the value of using sound systems engineering practices, while also applying aerospace best practices such as "test as you fly" and other lessons learned. FITO will use a variety of methods to reduce the technical, schedule, and cost risks of flying humans safely aboard a launch vehicle.
48 CFR 9905.502-50 - Techniques for application.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST... application. (a) The Fundamental Requirement is stated in terms of cost incurred and is equally applicable to...
75 FR 44725 - Airworthiness Directives; Pratt & Whitney PW4000 Series Turbofan Engines; Correction
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-29
... Engineer, Engine Certification Office, FAA, Engine and Propeller Directorate, 12 New England Executive Park..., Massachusetts, on July 23, 2010. Francis A. Favara, Manager, Engine and Propeller Directorate, Aircraft... PW4000 Series Turbofan Engines; Correction AGENCY: Federal Aviation Administration (FAA), DOT. ACTION...
1988-03-01
distribution Zb DECLASSIFICATION/OOWNGRADING SCHEDULE unlimited. 4 PERFORMING ORGANIZATION REPORT NUMBER(S) S MONITORING ORGANIZATION REPORT NUMBER(S...Technical Report CERC-88-1. 6a NAME OF PERFORMING ORGANIZATION 6b OFFICE SYMBOL 7a. NAME OF MONITORING ORGANIZATION USAEWES, Coastal Engineering (if...FUNDING/SPONSORING 8b OFFICE SYMBOL 9 PROCUREMENT INSTRUMENT IDENTIFICATION NUMBER ORGANIZATION US Army (If applicable) Engineer District, Norfolk Intra
Photocopy of plan (in U.S. Army office of Army Engineers ...
Photocopy of plan (in U.S. Army office of Army Engineers plans and drawings, Fort Hancock and Sandy hook proving ground, record group 7, drawer 44, Cartographic and Architectural branc, The National Archives, Washington, DC) Gillespie, G.L., map of a portion of Sandy Hook, NJ showing condition of beach in vicinity of dynamite gun emplacements, 1894 Engineer's wharf - U.S. Coast Guard Sandy Hook Station, Western Docking Structure, West of intersection of Canfield Road & Hartshorne Drive, Highlands, Monmouth County, NJ
Photocopy of plan (in U.S. Army office of Army Engineers ...
Photocopy of plan (in U.S. Army office of Army Engineers plans and drawings, Fort Hancock and Sandy hook proving ground, record group 7, drawer 44, Cartographic and Architectural branc, The National Archives, Washington, DC) from Talcott, T.M.R., plot of a survey of site, Fort at Sandy Hook, NJ, 1859-1860 Detail of engineer's wharf - U.S. Coast Guard Sandy Hook Station, Western Docking Structure, West of intersection of Canfield Road & Hartshorne Drive, Highlands, Monmouth County, NJ
Photocopy of plan (in U.S. Army office of Army Engineers ...
Photocopy of plan (in U.S. Army office of Army Engineers plans and drawings, Fort Hancock and Sandy hook proving ground, record group 7, drawer 44, Cartographic and Architectural branc, The National Archives, Washington, DC), cartographer unknown, title unknown, March 28, 1892 1890 lifesaving station shown near fort and beach, no boathouse near engineer's wharf - U.S. Coast Guard Sandy Hook Station, Western Docking Structure, West of intersection of Canfield Road & Hartshorne Drive, Highlands, Monmouth County, NJ
Synoptic Meteorology during the SNOW-ONE-A Field Experiment.
1983-05-01
AD ,34 888 SYNOPTIC METEOROLOGY DURING tHE SNOW-ONE A FIELD I EXPERIMENTIUP COLD REGIONS RESEARCH AND ENGINEERING LABHANOVER NN M A BILELLO MAY 83...PROGRAM ELEMENT. PROJECT. TASK U. S. Army Cold Regions Research and AREA & WORK UNIT NUMBERS Engineering Laboratory DA Project 4A762730AT42- Hanover, New...Hampshire 03755 B-El-5 It. CONTROLLING OFFICE NAME AND ADDRESS 12. REPORT DATE Office of the Ch ief of Engineers May 1983 Washington, D.C. 20314 13
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-19
... OFFICE OF MANAGEMENT AND BUDGET Calendar Year 2012 Cost of Outpatient Medical and Dental Services... Tortiously Liable Third Persons AGENCY: Office of Management and Budget, Executive Office of the President... Budget (OMB) by the President through Executive Order No. 11541 of July 1, 1970, the rates referenced...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-21
... OFFICE OF MANAGEMENT AND BUDGET Draft 2013 Report to Congress on the Benefits and Costs of Federal... President, Office of Management and Budget. ACTION: Notice of availability and request for comments. SUMMARY: The Office of Management and Budget (OMB) requests comments on its Draft 2013 Report to Congress on...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-11
... OFFICE OF MANAGEMENT AND BUDGET Fiscal Year 2013 Cost of Hospital and Medical Care Treatment... Tortiously Liable Third Persons AGENCY: Office of Management and Budget, Executive Office of the President... Budget (OMB) by the President through Executive Order No. 11541 of July 1, 1970, the rates referenced...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stephens, T. S.; Birky, A.; Gohlke, David
Under a diverse set of programs, the Vehicle Technologies and Fuel Cell Technologies Offices of the U.S. Department of Energy’s Office of Energy Efficiency and Renewable Energy invest in early-stage research of advanced batteries and electrification, engines and fuels, materials, and energy-efficient mobility systems; hydrogen production, delivery, and storage; and fuel cell technologies. This report documents the estimated benefits of successful development and implementation of advanced vehicle technologies. It presents a comparison of a scenario with completely successful implementation of Vehicle Technologies Office (VTO) and Fuel Cell Technologies Office (FCTO) technologies (the Program Success case) to a future in whichmore » there is no contribution after Fiscal Year 2017 by the VTO or FCTO to these technologies (the No Program case). Benefits were attributed to individual program technology areas, which included FCTO research and development and the VTO programs of electrification, advanced combustion engines and fuels, and materials technology. Projections for the Program Success case indicate that by 2035, the average fuel economy of on-road, light-duty vehicle stock could be 24% to 30% higher than in the No Program case, while fuel economy for on-road medium- and heavy-duty vehicle stock could be as much as 13% higher. The resulting petroleum savings in 2035 were estimated to be as high as 1.9 million barrels of oil per day, and reductions in greenhouse gas emissions were estimated to be as high as 320 million metric tons of carbon dioxide equivalent per year. Projections of light-duty vehicle adoption indicate that although advanced-technology vehicles may be somewhat more expensive to purchase, the fuel savings result in a net reduction of consumer cost. In 2035, reductions in annual fuel expenditures for vehicles (both light- and heavy-duty) are projected to range from $86 billion to $109 billion (2015$), while the projected increase in new vehicle expenditures in the same year ranges from $6 billion to $24 billion (2015$).« less
47 CFR 32.6123 - Office equipment expense.
Code of Federal Regulations, 2010 CFR
2010-10-01
... equipment expense. This account shall be charged only with costs incurred in connection with the office equipment itself. The costs of operators of this equipment shall be charged to accounts appropriate for the...
48 CFR 2448.103 - Processing value engineering change proposals.
Code of Federal Regulations, 2013 CFR
2013-10-01
... engineering change proposals. 2448.103 Section 2448.103 Federal Acquisition Regulations System DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT CONTRACT MANAGEMENT VALUE ENGINEERING 2448.103 Processing value engineering change proposals. Upon receipt of a Value Engineering Change Proposal (VECP), the Contracting Officer...
48 CFR 2448.103 - Processing value engineering change proposals.
Code of Federal Regulations, 2014 CFR
2014-10-01
... engineering change proposals. 2448.103 Section 2448.103 Federal Acquisition Regulations System DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT CONTRACT MANAGEMENT VALUE ENGINEERING 2448.103 Processing value engineering change proposals. Upon receipt of a Value Engineering Change Proposal (VECP), the Contracting Officer...
48 CFR 2448.103 - Processing value engineering change proposals.
Code of Federal Regulations, 2012 CFR
2012-10-01
... engineering change proposals. 2448.103 Section 2448.103 Federal Acquisition Regulations System DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT CONTRACT MANAGEMENT VALUE ENGINEERING 2448.103 Processing value engineering change proposals. Upon receipt of a Value Engineering Change Proposal (VECP), the Contracting Officer...
48 CFR 2448.103 - Processing value engineering change proposals.
Code of Federal Regulations, 2010 CFR
2010-10-01
... engineering change proposals. 2448.103 Section 2448.103 Federal Acquisition Regulations System DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT CONTRACT MANAGEMENT VALUE ENGINEERING 2448.103 Processing value engineering change proposals. Upon receipt of a Value Engineering Change Proposal (VECP), the Contracting Officer...
48 CFR 2448.103 - Processing value engineering change proposals.
Code of Federal Regulations, 2011 CFR
2011-10-01
... engineering change proposals. 2448.103 Section 2448.103 Federal Acquisition Regulations System DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT CONTRACT MANAGEMENT VALUE ENGINEERING 2448.103 Processing value engineering change proposals. Upon receipt of a Value Engineering Change Proposal (VECP), the Contracting Officer...
75 FR 30687 - Airworthiness Directives; Turbomeca Arriel 2B1 Turboshaft Engines
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-02
... Airworthiness Directives; Turbomeca Arriel 2B1 Turboshaft Engines AGENCY: Federal Aviation Administration (FAA... INFORMATION CONTACT: Kevin Dickert, Aerospace Engineer, Engine Certification Office, FAA, Engine & Propeller... public interest require adopting the AD with the change described previously. [[Page 30688
Gonzalez, Chris M; Jang, Tom; Raines, Melanie; Lys, Thomas Z; Schaeffer, Anthony J
2006-07-01
Cost containment in the office is becoming more important secondary to increasing overhead costs and lower reimbursement. In an attempt to limit these particular expenditures we analyzed and restructured our methods of ordering, storing and distributing office supply inventory. In a large academic practice with 11 urologists and approximately 20,000 annual patient visits an attempt was made to decrease overhead costs using the principle of just in time inventory popularized by large manufacturing companies. We initially issued a return of excess and/or unused supplies from our office inventory stock room. Our main supply room was then centralized to contain office supplies for up to 4 weeks. The 12 individual clinic rooms were stocked with appropriate supplies to last 1 week. Limited access to the main supply room was established and a supply manager was established to log all input and output. The initial credit for the return of unused/overstocked supplies was $10,107 in January 2004. Annual office supply charges in calendar year 2004 were $87,444 compared to charges in calendar year 2003 of $175,340. No stock outs occurred during year 2004 and all standing delivery orders were terminated. The total number of patient visits in calendar year 2004 was 20,170 compared to 19,455 in calendar year 2003. Decreasing overall inventory through accurate demand forecasting, judicious accounting, office supply centralization and just in time ordering is a potential area for significant overhead cost savings in a clinical practice.
NASA Technical Reports Server (NTRS)
Knip, G.; Plencner, R. M.; Eisenberg, J. D.
1980-01-01
The effects of engine configuration, advanced component technology, compressor pressure ratio and turbine rotor-inlet temperature on such figures of merit as vehicle gross weight, mission fuel, aircraft acquisition cost, operating, cost and life cycle cost are determined for three fixed- and two rotary-wing aircraft. Compared with a current production turboprop, an advanced technology (1988) engine results in a 23 percent decrease in specific fuel consumption. Depending on the figure of merit and the mission, turbine engine cost reductions required to achieve aircraft cost parity with a current spark ignition reciprocating (SIR) engine vary from 0 to 60 percent and from 6 to 74 percent with a hypothetical advanced SIR engine. Compared with a hypothetical turboshaft using currently available technology (1978), an advanced technology (1988) engine installed in a light twin-engine helicopter results in a 16 percent reduction in mission fuel and about 11 percent in most of the other figures of merit.
8. Engineering Drawing of Panama Gun Mount by U.S. Engineering ...
8. Engineering Drawing of Panama Gun Mount by U.S. Engineering Office, San Francisco, California - Fort Funston, Panama Mounts for 155mm Guns, Skyline Boulevard & Great Highway, San Francisco, San Francisco County, CA