Sample records for engineering implementation plan

  1. Predictive Engineering Implementation at KSC

    NASA Technical Reports Server (NTRS)

    Mosconi, Jane; Schafer, Loraine

    1995-01-01

    This paper provides an overview of what the primary contractors at Kennedy Space Center (KSC) are doing in the field of predictive engineering. The technologies employed by each of the contractors and the cost savings associated with the implementation of these predictive engineering methods are discussed. The sources include predictive engineering implementation plans, published by each of the contractors and interviews with the authors of these implementation plans.

  2. STEM Teachers' Planned and Enacted Attempts at Implementing Engineering Design-Based Instruction

    ERIC Educational Resources Information Center

    Capobianco, Brenda M.; Rupp, Madeline

    2014-01-01

    This study investigates grades 5 and 6 science, technology, engineering, and mathematics (STEM) teachers' planned and actualized engineering design-based instruction, the instruments used to characterize their efforts, and the implications this work has for teachers' implementations of an integrated approach to STEM education.…

  3. Tank waste remediation system configuration management implementation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vann, J.M.

    1998-03-31

    The Tank Waste Remediation System (TWRS) Configuration Management Implementation Plan describes the actions that will be taken by Project Hanford Management Contract Team to implement the TWRS Configuration Management program defined in HNF 1900, TWRS Configuration Management Plan. Over the next 25 years, the TWRS Project will transition from a safe storage mission to an aggressive retrieval, storage, and disposal mission in which substantial Engineering, Construction, and Operations activities must be performed. This mission, as defined, will require a consolidated configuration management approach to engineering, design, construction, as-building, and operating in accordance with the technical baselines that emerge from themore » life cycles. This Configuration Management Implementation Plan addresses the actions that will be taken to strengthen the TWRS Configuration Management program.« less

  4. 33 CFR 385.26 - Project Implementation Reports.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Implementation Report is a document that provides information on plan formulation and evaluation, engineering and..., environmental and/or economic benefits, engineering and design, costs, environmental impacts, real estate..., optimization and justification, cost-effectiveness, and engineering feasibility of the project; (xiii) Include...

  5. 33 CFR 385.30 - Master Implementation Sequencing Plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Incorporating New Information Into the Plan § 385.30 Master Implementation Sequencing Plan. (a) Not later than... projects of the Plan, including pilot projects and operational elements, based on the best scientific, technical, funding, contracting, and other information available. The Corps of Engineers and the South...

  6. 33 CFR 385.13 - Projects implemented under additional program authority.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Implementation Report is prepared and approved in accordance with § 385.26; and (3) Not exceed a total cost of... RESTORATION PLAN CERP Implementation Processes § 385.13 Projects implemented under additional program authority. (a) To expedite implementation of the Plan, the Corps of Engineers and non-Federal sponsors may...

  7. 48 CFR 36.601-4 - Implementation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...

  8. 48 CFR 36.601-4 - Implementation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...

  9. 48 CFR 36.601-4 - Implementation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...

  10. 48 CFR 36.601-4 - Implementation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...

  11. 48 CFR 36.601-4 - Implementation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...

  12. Planning and implementing forest operations to achieve sustainable forests: Proceedings of papers presented at the joint meeting of the Council on Forest Engineering and International Union of Forest Research Organizations.

    Treesearch

    Charles R. Blinn; Michael A. Thompson

    1996-01-01

    Contains a variety of papers presented at the joint meeting of the Council on Forest Engineering and International Union of Forest Research Organizations Subject Group S3.04 and that support the meeting theme "Planning and Implementing Forest Operations to Achieve Sustainable Forests."

  13. Design and Implementation of a Project-Based Active/Cooperative Engineering Design Course for Freshmen

    ERIC Educational Resources Information Center

    Abdulaal, R. M.; Al-Bahi, A. M.; Soliman, A. Y.; Iskanderani, F. I.

    2011-01-01

    A project-based active/cooperative design course is planned, implemented, assessed and evaluated to achieve several desired engineering outcomes. The course allows freshman-level students to gain professional hands-on engineering design experience through an opportunity to practise teamwork, quality principles, communication skills, life-long…

  14. A report on NASA software engineering and Ada training requirements

    NASA Technical Reports Server (NTRS)

    Legrand, Sue; Freedman, Glenn B.; Svabek, L.

    1987-01-01

    NASA's software engineering and Ada skill base are assessed and information that may result in new models for software engineering, Ada training plans, and curricula are provided. A quantitative assessment which reflects the requirements for software engineering and Ada training across NASA is provided. A recommended implementation plan including a suggested curriculum with associated duration per course and suggested means of delivery is also provided. The distinction between education and training is made. Although it was directed to focus on NASA's need for the latter, the key relationships to software engineering education are also identified. A rationale and strategy for implementing a life cycle education and training program are detailed in support of improved software engineering practices and the transition to Ada.

  15. 33 CFR 385.9 - Implementation principles.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Responsibilities § 385.9 Implementation principles. The Corps of Engineers and the South Florida Water Management...) Endorsement of the Plan as a restoration framework is not intended as a constraint on innovation during implementation through the adaptive management process. Continuous improvement of the Plan shall be sought to...

  16. A Plan for Revolutionary Change in Gas Turbine Engine Control System Architecture

    NASA Technical Reports Server (NTRS)

    Culley, Dennis E.

    2011-01-01

    The implementation of Distributed Engine Control technology on the gas turbine engine has been a vexing challenge for the controls community. A successful implementation requires the resolution of multiple technical issues in areas such as network communications, power distribution, and system integration, but especially in the area of high temperature electronics. Impeding the achievement has been the lack of a clearly articulated message about the importance of the distributed control technology to future turbine engine system goals and objectives. To resolve these issues and bring the technology to fruition has, and will continue to require, a broad coalition of resources from government, industry, and academia. This presentation will describe the broad challenges facing the next generation of advanced control systems and the plan which is being put into action to successfully implement the technology on the next generation of gas turbine engine systems.

  17. Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    GRYGIEL, M.L.

    1998-10-08

    Manage the Site Systems Engineering process to provide a traceable integrated requirements-driven, and technically defensible baseline. Through the Site Integration Group(SIG), Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the RL Project Managers, the Project Direction Office and with the Project Major Subcontractors, as well as with the Site Planning organization. Systems Implementation: (1) Develops, maintains, and controls the site integrated technical baseline, ensures the Systems Engineering interfaces between projects are documented, and maintain the Site Environmental Management Specification. (2) Develops and uses dynamic simulation models for verification of the baselinemore » and analysis of alternatives. (3) Performs and documents fictional and requirements analyses. (4) Works with projects, technology management, and the SIG to identify and resolve technical issues. (5) Supports technical baseline information for the planning and budgeting of the Accelerated Cleanup Plan, Multi-Year Work Plans, Project Baseline Summaries as well as performance measure reporting. (6) Works with projects to ensure the quality of data in the technical baseline. (7) Develops, maintains and implements the site configuration management system.« less

  18. Integrated water resources management using engineering measures

    NASA Astrophysics Data System (ADS)

    Huang, Y.

    2015-04-01

    The management process of Integrated Water Resources Management (IWRM) consists of aspects of policies/strategies, measures (engineering measures and non-engineering measures) and organizational management structures, etc., among which engineering measures such as reservoirs, dikes, canals, etc., play the backbone that enables IWRM through redistribution and reallocation of water in time and space. Engineering measures are usually adopted for different objectives of water utilization and water disaster prevention, such as flood control and drought relief. The paper discusses the planning and implementation of engineering measures in IWRM of the Changjiang River, China. Planning and implementation practices of engineering measures for flood control and water utilization, etc., are presented. Operation practices of the Three Gorges Reservoir, particularly the development and application of regulation rules for flood management, power generation, water supply, ecosystem needs and sediment issues (e.g. erosion and siltation), are also presented. The experience obtained in the implementation of engineering measures in Changjiang River show that engineering measures are vital for IWRM. However, efforts should be made to deal with changes of the river system affected by the operation of engineering measures, in addition to escalatory development of new demands associated with socio-economic development.

  19. Tank waste remediation system systems engineering management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peck, L.G.

    1998-01-08

    This Systems Engineering Management Plan (SEMP) describes the Tank Waste Remediation System (TWRS) implementation of the US Department of Energy (DOE) systems engineering policy provided in 97-IMSD-193. The SEMP defines the products, process, organization, and procedures used by the TWRS Project to implement the policy. The SEMP will be used as the basis for tailoring the systems engineering applications to the development of the physical systems and processes necessary to achieve the desired end states of the program. It is a living document that will be revised as necessary to reflect changes in systems engineering guidance as the program evolves.more » The US Department of Energy-Headquarters has issued program management guidance, DOE Order 430. 1, Life Cycle Asset Management, and associated Good Practice Guides that include substantial systems engineering guidance.« less

  20. Transition in Gas Turbine Control System Architecture: Modular, Distributed, and Embedded

    NASA Technical Reports Server (NTRS)

    Culley, Dennis

    2010-01-01

    Controls systems are an increasingly important component of turbine-engine system technology. However, as engines become more capable, the control system itself becomes ever more constrained by the inherent environmental conditions of the engine; a relationship forced by the continued reliance on commercial electronics technology. A revolutionary change in the architecture of turbine-engine control systems will change this paradigm and result in fully distributed engine control systems. Initially, the revolution will begin with the physical decoupling of the control law processor from the hostile engine environment using a digital communications network and engine-mounted high temperature electronics requiring little or no thermal control. The vision for the evolution of distributed control capability from this initial implementation to fully distributed and embedded control is described in a roadmap and implementation plan. The development of this plan is the result of discussions with government and industry stakeholders

  1. 77 FR 46961 - Approval and Promulgation of Implementation Plans; Wisconsin; Volatile Organic Compound Emission...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-07

    ... holidays. We recommend that you telephone Steven Rosenthal, Environmental Engineer, at (312) 886-6052... Engineer, Attainment Planning and Maintenance Section, Air Programs Branch (AR-18J), Environmental... January 2012, No. 673, effective February 1, 2012. (D) NR 419.045 Industrial wastewater operations, as...

  2. Manufacturing engineering: Principles for optimization

    NASA Astrophysics Data System (ADS)

    Koenig, Daniel T.

    Various subjects in the area of manufacturing engineering are addressed. The topics considered include: manufacturing engineering organization concepts and management techniques, factory capacity and loading techniques, capital equipment programs, machine tool and equipment selection and implementation, producibility engineering, methods, planning and work management, and process control engineering in job shops. Also discussed are: maintenance engineering, numerical control of machine tools, fundamentals of computer-aided design/computer-aided manufacture, computer-aided process planning and data collection, group technology basis for plant layout, environmental control and safety, and the Integrated Productivity Improvement Program.

  3. Sandia National Laboratories Advanced Simulation and Computing (ASC) software quality plan : ASC software quality engineering practices Version 3.0.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Turgeon, Jennifer L.; Minana, Molly A.; Hackney, Patricia

    2009-01-01

    The purpose of the Sandia National Laboratories (SNL) Advanced Simulation and Computing (ASC) Software Quality Plan is to clearly identify the practices that are the basis for continually improving the quality of ASC software products. Quality is defined in the US Department of Energy/National Nuclear Security Agency (DOE/NNSA) Quality Criteria, Revision 10 (QC-1) as 'conformance to customer requirements and expectations'. This quality plan defines the SNL ASC Program software quality engineering (SQE) practices and provides a mapping of these practices to the SNL Corporate Process Requirement (CPR) 001.3.6; 'Corporate Software Engineering Excellence'. This plan also identifies ASC management's and themore » software project teams responsibilities in implementing the software quality practices and in assessing progress towards achieving their software quality goals. This SNL ASC Software Quality Plan establishes the signatories commitments to improving software products by applying cost-effective SQE practices. This plan enumerates the SQE practices that comprise the development of SNL ASC's software products and explains the project teams opportunities for tailoring and implementing the practices.« less

  4. Developing an interdisciplinary certificate program in transportation planning.

    DOT National Transportation Integrated Search

    2010-09-01

    This project develops and implements a graduate certificate in transportation planning. Texas A&M : University (A&M) currently offers instruction in transportation through its Master of Urban Planning (MUP) : and Civil Engineering (CE) programs; howe...

  5. 75 FR 5514 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-03

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R05-OAR-2009-0771; FRL-9108-7] Approval and Promulgation of Air Quality Implementation Plans; Indiana; Correction AGENCY: Environmental Protection Agency..., Environmental Engineer, Criteria Pollutant Section, Air Programs Branch (AR-18J), Environmental Protection...

  6. Engineering Technical Review Planning Briefing

    NASA Technical Reports Server (NTRS)

    Gardner, Terrie

    2012-01-01

    The general topics covered in the engineering technical planning briefing are 1) overviews of NASA, Marshall Space Flight Center (MSFC), and Engineering, 2) the NASA Systems Engineering(SE) Engine and its implementation , 3) the NASA Project Life Cycle, 4) MSFC Technical Management Branch Services in relation to the SE Engine and the Project Life Cycle , 5) Technical Reviews, 6) NASA Human Factor Design Guidance , and 7) the MSFC Human Factors Team. The engineering technical review portion of the presentation is the primary focus of the overall presentation and will address the definition of a design review, execution guidance, the essential stages of a technical review, and the overall review planning life cycle. Examples of a technical review plan content, review approaches, review schedules, and the review process will be provided and discussed. The human factors portion of the presentation will focus on the NASA guidance for human factors. Human factors definition, categories, design guidance, and human factor specialist roles will be addressed. In addition, the NASA Systems Engineering Engine description, definition, and application will be reviewed as background leading into the NASA Project Life Cycle Overview and technical review planning discussion.

  7. JPL Contamination Control Engineering

    NASA Technical Reports Server (NTRS)

    Blakkolb, Brian

    2013-01-01

    JPL has extensive expertise fielding contamination sensitive missions-in house and with our NASA/industry/academic partners.t Development and implementation of performance-driven cleanliness requirements for a wide range missions and payloads - UV-Vis-IR: GALEX, Dawn, Juno, WFPC-II, AIRS, TES, et al - Propulsion, thermal control, robotic sample acquisition systems. Contamination control engineering across the mission life cycle: - System and payload requirements derivation, analysis, and contamination control implementation plans - Hardware Design, Risk trades, Requirements V-V - Assembly, Integration & Test planning and implementation - Launch site operations and launch vehicle/payload integration - Flight ops center dot Personnel on staff have expertise with space materials development and flight experiments. JPL has capabilities and expertise to successfully address contamination issues presented by space and habitable environments. JPL has extensive experience fielding and managing contamination sensitive missions. Excellent working relationship with the aerospace contamination control engineering community/.

  8. Implementation of the Large-Scale Operations Management Test in the State of Washington.

    DTIC Science & Technology

    1982-12-01

    During FY 79, the U.S. Army Engineer Waterways Experiment Station (WES), Vicksburg, Miss., completed the first phase of its 3-year Large-Scale Operations Management Test (LSOMT). The LSOMT was designed to develop an operational plan to identify methodologies that can be implemented by the U.S. Army Engineer District, Seattle (NPS), to prevent the exotic aquatic macrophyte Eurasian watermilfoil (Myrophyllum spicatum L.) from reaching problem-level proportions in water bodies in the state of Washington. The WES developed specific plans as integral elements

  9. 33 CFR 332.6 - Monitoring.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...., forested wetlands, bogs). Following project implementation, the district engineer may reduce or waive the... performance standards, and may include plans (such as as-built plans), maps, and photographs to illustrate...

  10. Microprocessors in Systems Engineering at the U.S. Naval Academy.

    ERIC Educational Resources Information Center

    Mitchell, Eugene E., Ed.; Lowe, W. M., Ed.

    1982-01-01

    Describes the introduction of microprocessors into the Weapons and Systems Engineering Department at the U.S. Naval Academy, including planning decisions, implementation, procedures, uses of microprocessors in the department, and impact on the Systems Engineering major and curriculum. (SK)

  11. 76 FR 47092 - Approval and Promulgation of Implementation Plans; Reasonably Available Control Technology for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-04

    ... oxides of nitrogen from the stationary reciprocating, diesel fuel fired, internal combustion engines..., diesel fuel fired, internal combustion engines--one existing and one new engine. B. Why is EPA proposing... both engines. In addition, the Conditions of Approval specify the NO X emissions limits, combustion...

  12. 77 FR 65821 - Approval and Promulgation of Implementation Plans; New Mexico; Albuquerque/Bernalillo County...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-31

    ... inspections for 1998 and newer diesel vehicles less than 10,001 pounds and all gasoline/ electric hybrid... greater than 1,000 and less than 10,001 pounds; including all hybrid vehicle gasoline engines; changing... Promulgation of Implementation Plans; New Mexico; Albuquerque/Bernalillo County: Motor Vehicle Inspection...

  13. Strategic plan : providing high precision search to NASA employees using the NASA engineering network

    NASA Technical Reports Server (NTRS)

    Dutra, Jayne E.; Smith, Lisa

    2006-01-01

    The goal of this plan is to briefly describe new technologies available to us in the arenas of information discovery and discuss the strategic value they have for the NASA enterprise with some considerations and suggestions for near term implementations using the NASA Engineering Network (NEN) as a delivery venue.

  14. Re-engineering the Federal planning process: A total Federal planning strategy, integrating NEPA with modern management tools

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Eccleston, C.H.

    1997-09-05

    The National Environmental Policy Act (NEPA) of 1969 was established by Congress more than a quarter of a century ago, yet there is a surprising lack of specific tools, techniques, and methodologies for effectively implementing these regulatory requirements. Lack of professionally accepted techniques is a principal factor responsible for many inefficiencies. Often, decision makers do not fully appreciate or capitalize on the true potential which NEPA provides as a platform for planning future actions. New approaches and modem management tools must be adopted to fully achieve NEPA`s mandate. A new strategy, referred to as Total Federal Planning, is proposed formore » unifying large-scale federal planning efforts under a single, systematic, structured, and holistic process. Under this approach, the NEPA planning process provides a unifying framework for integrating all early environmental and nonenvironmental decision-making factors into a single comprehensive planning process. To promote effectiveness and efficiency, modem tools and principles from the disciplines of Value Engineering, Systems Engineering, and Total Quality Management are incorporated. Properly integrated and implemented, these planning tools provide the rigorous, structured, and disciplined framework essential in achieving effective planning. Ultimately, the goal of a Total Federal Planning strategy is to construct a unified and interdisciplinary framework that substantially improves decision-making, while reducing the time, cost, redundancy, and effort necessary to comply with environmental and other planning requirements. At a time when Congress is striving to re-engineer the governmental framework, apparatus, and process, a Total Federal Planning philosophy offers a systematic approach for uniting the disjointed and often convoluted planning process currently used by most federal agencies. Potentially this approach has widespread implications in the way federal planning is approached.« less

  15. Wildlife Habitat Impact Assessment, Chief Joseph Dam Project, Washington : Project Report 1992.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kuehn, Douglas; Berger, Matthew

    1992-01-01

    Under the Pacific Northwest Electric Power Planning and Conservation Act of 1980, and the subsequent Northwest Power Planning Council`s Columbia River Basin Fish and Wildlife Program, a wildlife habitat impact assessment and identification of mitigation objectives have been developed for the US Army Corps of Engineer`s Chief Joseph Dam Project in north-central Washington. This study will form the basis for future mitigation planning and implementation.

  16. Research on Building Education & Workforce Capacity in Systems Engineering

    DTIC Science & Technology

    2011-10-31

    product or prototype that addresses a real DoD need. Implemented as pilot courses in eight civilian and six military universities affiliated with...Engineering 1 1.1 Computer Engineering 1 1.1 Operations Research 1 1.1 Product Architecture 1 1.1 Total 93 100.0 Table 7: Breakdown of Student... product specifications, inattention to budget limits and safety issues, inattention to product life cycle, poor implementation of risk management plans

  17. The HAL 9000 Space Operating System Real-Time Planning Engine Design and Operations Requirements

    NASA Technical Reports Server (NTRS)

    Stetson, Howard; Watson, Michael D.; Shaughnessy, Ray

    2012-01-01

    In support of future deep space manned missions, an autonomous/automated vehicle, providing crew autonomy and an autonomous response planning system, will be required due to the light time delays in communication. Vehicle capabilities as a whole must provide for tactical response to vehicle system failures and space environmental effects induced failures, for risk mitigation of permanent loss of communication with Earth, and for assured crew return capabilities. The complexity of human rated space systems and the limited crew sizes and crew skills mix drive the need for a robust autonomous capability on-board the vehicle. The HAL 9000 Space Operating System[2] designed for such missions and space craft includes the first distributed real-time planning / re-planning system. This paper will detail the software architecture of the multiple planning engine system, and the interface design for plan changes, approval and implementation that is performed autonomously. Operations scenarios will be defined for analysis of the planning engines operations and its requirements for nominal / off nominal activities. An assessment of the distributed realtime re-planning system, in the defined operations environment, will be provided as well as findings as it pertains to the vehicle, crew, and mission control requirements needed for implementation.

  18. Rapid Development: A Content Analysis Comparison of Literature and Purposive Sampling of AFRL Rapid Reaction Projects

    DTIC Science & Technology

    2011-12-01

    systems engineering technical and technical management processes. Technical Planning, Stakeholders Requirements Development, and Architecture Design were...Stakeholder Requirements Definition, Architecture Design and Technical Planning. A purposive sampling of AFRL rapid development program managers and engineers...emphasize one process over another however Architecture Design , Implementation scored higher among Technical Processes. Decision Analysis, Technical

  19. 40 CFR 49.22 - Federal implementation plan for Tri-Cities landfill, Salt River Pima-Maricopa Indian Community.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...-Cities landfill, Salt River Pima-Maricopa Indian Community. 49.22 Section 49.22 Protection of Environment... MANAGEMENT Tribal Authority § 49.22 Federal implementation plan for Tri-Cities landfill, Salt River Pima... construction of electricity-generating engines owned and operated by the Salt River Project at the Tri-Cities...

  20. Design and utilization of a Flight Test Engineering Database Management System at the NASA Dryden Flight Research Facility

    NASA Technical Reports Server (NTRS)

    Knighton, Donna L.

    1992-01-01

    A Flight Test Engineering Database Management System (FTE DBMS) was designed and implemented at the NASA Dryden Flight Research Facility. The X-29 Forward Swept Wing Advanced Technology Demonstrator flight research program was chosen for the initial system development and implementation. The FTE DBMS greatly assisted in planning and 'mass production' card preparation for an accelerated X-29 research program. Improved Test Plan tracking and maneuver management for a high flight-rate program were proven, and flight rates of up to three flights per day, two times per week were maintained.

  1. 23 CFR 652.11 - Planning.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Planning. 652.11 Section 652.11 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS PEDESTRIAN AND BICYCLE ACCOMMODATIONS AND PROJECTS § 652.11 Planning. Federally aided bicycle and pedestrian projects implemented within...

  2. Incorporating natural hazard assessments into municipal master-plans; case-studies from Israel

    NASA Astrophysics Data System (ADS)

    Katz, Oded

    2010-05-01

    The active Dead Sea Rift (DSR) runs along the length of Israel, making the entire state susceptible to earthquake-related hazards. Current building codes generally acknowledge seismic hazards and direct engineers towards earthquake-resistant structures. However, hazard mapping on a scale fit for municipal/governmental planning is subject to local initiative and is currently not mandatory as seems necessary. In the following, a few cases of seismic-hazard evaluation made by the Geological Survey of Israel are presented, emphasizing the reasons for their initiation and the way results were incorporated (or not). The first case is a seismic hazard qualitative micro-zonation invited by the municipality of Jerusalem as part of a new master plan. This work resulted in maps (1:50,000; GIS format) identifying areas prone to (1) amplification of seismic shaking due to site characteristics (outcrops of soft rocks or steep topography) and (2) sites with earthquake induced landslide (EILS) hazard. Results were validated using reports from the 1927, M=6.2 earthquake that originated along the DSR about 30km east of Jerusalem. Although the hazard maps were accepted by municipal authorities, practical use by geotechnical engineers working within the frame of the new master-plan was not significant. The main reason for that is apparently a difference of opinion between the city-engineers responsible for implementing the new master-plan and the geologists responsible of the hazard evaluation. The second case involves evaluation of EILS hazard for two towns located further north along the DSR, Zefat and Tiberias. Both were heavily damaged more than once by strong earthquakes in past centuries. Work was carried out as part of a governmental seismic-hazard reduction program. The results include maps (1:10,000 scales) of sites with high EILS hazard identified within city limits. Maps (in GIS format) were sent to city engineers with reports explaining the methods and results. As far as we know, widespread implementation of the maps within municipal master plans never came about, and there was no open discussion between city engineers and the Geological Survey. The main reasons apparently are (1) a lack, until recently, of mandatory building codes requiring incorporation of EILS hazard; (2) budget priorities; (3) failure to involve municipality personnel in planning and executing the EILS hazard evaluation. These cases demonstrate that for seismic hazard data to be incorporated and implemented within municipal master-plans there needs to be (1) active involvement of municipal officials and engineers from the early planning stages of the evaluation campaign, and (2) a-priori dedication of funds towards implementation of evaluation results.

  3. 40 CFR 85.2210 - Engine restart 2500 rpm/idle test-EPA 81.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 18 2010-07-01 2010-07-01 false Engine restart 2500 rpm/idle test-EPA... Warranty Short Tests § 85.2210 Engine restart 2500 rpm/idle test—EPA 81. (a)(1) General calendar year... engines. (ii) In a state for which the Administrator has approved a State Implementation Plan revision...

  4. 75 FR 883 - Environmental Impact Statement; Maricopa County, AZ

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-06

    ...: Kenneth Davis, Senior Engineering Manager for Operations, Federal Highway Administration, 4000 N. Central..., 2009. Kenneth H. Davis, Senior Engineering Manager for Operations, Federal Highway Administration... Research, Planning and Construction. The regulations implementing Executive Order 12372 regarding...

  5. 29 CFR 1926.705 - Requirements for lift-slab construction operations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... operations shall be designed and planned by a registered professional engineer who has experience in lift-slab construction. Such plans and designs shall be implemented by the employer and shall include detailed instructions and sketches indicating the prescribed method of erection. These plans and designs...

  6. 29 CFR 1926.705 - Requirements for lift-slab construction operations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... operations shall be designed and planned by a registered professional engineer who has experience in lift-slab construction. Such plans and designs shall be implemented by the employer and shall include detailed instructions and sketches indicating the prescribed method of erection. These plans and designs...

  7. 29 CFR 1926.705 - Requirements for lift-slab construction operations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... operations shall be designed and planned by a registered professional engineer who has experience in lift-slab construction. Such plans and designs shall be implemented by the employer and shall include detailed instructions and sketches indicating the prescribed method of erection. These plans and designs...

  8. 29 CFR 1926.705 - Requirements for lift-slab construction operations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... operations shall be designed and planned by a registered professional engineer who has experience in lift-slab construction. Such plans and designs shall be implemented by the employer and shall include detailed instructions and sketches indicating the prescribed method of erection. These plans and designs...

  9. 29 CFR 1926.705 - Requirements for lift-slab construction operations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... operations shall be designed and planned by a registered professional engineer who has experience in lift-slab construction. Such plans and designs shall be implemented by the employer and shall include detailed instructions and sketches indicating the prescribed method of erection. These plans and designs...

  10. FY 95 engineering work plan for the design reconstitution implementation action plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bigbee, J.D.

    Design reconstitution work is to be performed as part of an overall effort to upgrade Configuration Management (CM) at TWRS. WHC policy is to implement a program that is compliant with DOE-STD-1073-93, Guide for Operational Configuration Management Program. DOE-STD-1073 requires an adjunct program for reconstituting design information. WHC-SD-WM-CM-009, Design Reconstitution Program Plan for Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System, is the TWRS plan for meeting DOE-STD-1073 design reconstitution requirements. The design reconstitution plan is complex requiring significant time and effort for implementation. In order to control costs, and integrate the work into other TWRS activities,more » a Design Reconstitution Implementation Action Plan (DR IAP) will be developed, and approved by those organizations having ownership or functional interest in this activity.« less

  11. Progressively implementation of the new degrees at E.T.S. of Agriculture Engineering and extinction of the earlier degrees

    NASA Astrophysics Data System (ADS)

    Arce, A.; Caniego, J.; Vazquez, J.; Serrano, A.; Tarquis, A. M.; Cartagena, M. C.

    2012-04-01

    The Bologna process is to improve the quality of education, mobility, diversity and the competitiveness and involves three fundamental changes: transform of the structure of titles, changing in methods of teaching and implementation of the systems of quality assurance. Once that the new degrees have been implemented with this structure, and began at E.T.S. of Agriculture Engineering (ETSIA) at Madrid from 2010-2011 course, the main aim of this work is to deeply study the changes in teaching methodology as well as progressively implementation of the educational planning of the three new degrees: Engineering and Agronomic Graduate, Food Industry Engineering Graduate and Agro-environmental Graduate. Each one of them presents 240 ECTS with a common first course and will have access to an official Master in Agronomic Engineering. As part as an educational innovation project awarded by the Technical University of Madrid (UPM) to improve educational quality, the second course has been designed with the main objective to continue the educative model implemented last course. This model identifies several teaching activities and represents a proper teaching style at ETSIA-UPM. At the same time, a monitoring and development coordination plans have been established. On the other hand, a procedure to extinguish the earlier plans of Agriculture Engineering was also defined. Other activities related to this Project were the information improvement of the grades, in particular at High Schools centers, improving the processes of reception, counseling and tutoring and mentoring. Likewise, cooperative working workshops and programs to support the teaching of English language were implemented. Satisfaction surveys and opinion polls were done to professors and students involved in first course in order to test several aspects of this project. The students surveys were analyzed taking in account the academic results and their participation in mentoring activities giving a highly satisfactory level. In general, the professors gave the same result although they pointed out certain discontent respect to some circumstances giving some solutions to correct these problems.

  12. ThermoData Engine (TDE): software implementation of the dynamic data evaluation concept. 5. Experiment planning and product design.

    PubMed

    Diky, Vladimir; Chirico, Robert D; Kazakov, Andrei F; Muzny, Chris D; Magee, Joseph W; Abdulagatov, Ilmutdin; Kang, Jeong Won; Kroenlein, Kenneth; Frenkel, Michael

    2011-01-24

    ThermoData Engine (TDE) is the first full-scale software implementation of the dynamic data evaluation concept, as reported recently in this journal. In the present paper, we describe development of an algorithmic approach to assist experiment planning through assessment of the existing body of knowledge, including availability of experimental thermophysical property data, variable ranges studied, associated uncertainties, state of prediction methods, and parameters for deployment of prediction methods and how these parameters can be obtained using targeted measurements, etc., and, indeed, how the intended measurement may address the underlying scientific or engineering problem under consideration. A second new feature described here is the application of the software capabilities for aid in the design of chemical products through identification of chemical systems possessing desired values of thermophysical properties within defined ranges of tolerance. The algorithms and their software implementation to achieve this are described. Finally, implementation of a new data validation and weighting system is described for vapor-liquid equilibrium (VLE) data, and directions for future enhancements are outlined.

  13. A candidate architecture for monitoring and control in chemical transfer propulsion systems

    NASA Technical Reports Server (NTRS)

    Binder, Michael P.; Millis, Marc G.

    1990-01-01

    To support the exploration of space, a reusable space-based rocket engine must be developed. This engine must sustain superior operability and man-rated levels of reliability over several missions with limited maintenance or inspection between flights. To meet these requirements, an expander cycle engine incorporating a highly capable control and health monitoring system is planned. Alternatives for the functional organization and the implementation architecture of the engine's monitoring and control system are discussed. On the basis of this discussion, a decentralized architecture is favored. The trade-offs between several implementation options are outlined and future work is proposed.

  14. IMPLEMENTING PRACTICAL PICO-HYDROPOWER

    EPA Science Inventory

    Deliverables for this proposal will be energy output data modeled from experimental testing of the hydropower unit and monitoring of the stormwater handling infrastructure in the GIS building; along with a design and engineering plan for implementation and building integrat...

  15. NASA Engineering Excellence: A Case Study on Strengthening an Engineering Organization

    NASA Technical Reports Server (NTRS)

    Shivers, C. Herbert; Wessel, Vernon W.

    2006-01-01

    NASA implemented a system of technical authority following the Columbia Accident Investigation Board (CAE) report calling for independent technical authority to be exercised on the Space Shuttle Program activities via a virtual organization of personnel exercising specific technical authority responsibilities. After the current NASA Administrator reported for duty, and following the first of two planned "Shuttle Return to Flight" missions, the NASA Chief Engineer and the Administrator redirected the Independent Technical Authority to a program of Technical Excellence and Technical Authority exercised within the existing engineering organizations. This paper discusses the original implementation of technical authority and the transition to the new implementation of technical excellence, including specific measures aimed at improving safety of future Shuttle and space exploration flights.

  16. 75 FR 3183 - Approval and Promulgation of Air Quality Implementation Plan: Kentucky; Approval Section 110(a)(1...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-20

    ...) Federal motor vehicle control program; (2) fleet turnover of automobiles; (3) low reid vapor pressure of... vehicles standard; (6) large nonroad diesel engines rule; (7) nonroad spark ignition engines and recreational engines standard; (8) point source emission reductions; (9) Air Products and Chemicals -21-157...

  17. 77 FR 24843 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Removal of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-26

    ... requirements for large stationary internal combustion engines under the NO X SIP Call. Transco Station 175 has...), large stationary internal combustion engines, and large cement kilns. The NO X SIP Call was challenged... internal combustion engines and large cement kilns. EPA approved Virginia's Phase I NO X SIP Call...

  18. Development of engineering drawing ability for emerging engineering education

    NASA Astrophysics Data System (ADS)

    Guo, Jian-Wen; Cao, Xiao-Chang; Xie, Li; Jin, Jian-Jun; Wang, Chu-Diao

    2017-09-01

    Students majoring in engineering is required by the emerging engineering education (3E) in the aspect of their ability of engineering drawing. This paper puts forward training mode of engineering drawing ability for 3E. This mode consists of three kinds of training including training in courses, training in competitions and training in actual demand. We also design the feasible implementation plan and supplies viable references to carry out the mode.

  19. Emissions and new technology programs for conventional spark-ignition aircraft engines

    NASA Technical Reports Server (NTRS)

    Wintucky, W. T.

    1976-01-01

    A long-range technology plan in support of general aviation engines was formulated and is being implemented at the Lewis Research Center. The overall program was described, and that part of the program that represents the in-house effort at Lewis was presented in detail. Three areas of government and industry effort involving conventional general-aviation piston engines were part of a coordinated overall plan: (1) FAA/NASA joint program, (2) NASA contract exhaust emissions pollution reduction program, and (3) NASA in-house emissions reduction and new technology program.

  20. 33 CFR 385.1 - Purpose of the programmatic regulations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... regulations. 385.1 Section 385.1 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROGRAMMATIC REGULATIONS FOR THE COMPREHENSIVE EVERGLADES RESTORATION PLAN General... of Project Implementation Reports, Project Cooperation Agreements, plans and specifications, Pilot...

  1. 33 CFR 385.1 - Purpose of the programmatic regulations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... regulations. 385.1 Section 385.1 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROGRAMMATIC REGULATIONS FOR THE COMPREHENSIVE EVERGLADES RESTORATION PLAN General... of Project Implementation Reports, Project Cooperation Agreements, plans and specifications, Pilot...

  2. 33 CFR 385.1 - Purpose of the programmatic regulations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... regulations. 385.1 Section 385.1 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROGRAMMATIC REGULATIONS FOR THE COMPREHENSIVE EVERGLADES RESTORATION PLAN General... of Project Implementation Reports, Project Cooperation Agreements, plans and specifications, Pilot...

  3. 33 CFR 385.1 - Purpose of the programmatic regulations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... regulations. 385.1 Section 385.1 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROGRAMMATIC REGULATIONS FOR THE COMPREHENSIVE EVERGLADES RESTORATION PLAN General... of Project Implementation Reports, Project Cooperation Agreements, plans and specifications, Pilot...

  4. 33 CFR 385.1 - Purpose of the programmatic regulations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... regulations. 385.1 Section 385.1 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROGRAMMATIC REGULATIONS FOR THE COMPREHENSIVE EVERGLADES RESTORATION PLAN General... of Project Implementation Reports, Project Cooperation Agreements, plans and specifications, Pilot...

  5. Local Government Planning Tool to Calculate Institutional and Engineering Control Costs for Brownfield Properties

    EPA Pesticide Factsheets

    This cost calculator is designed as a guide for municipal or local governments to assist in calculating their expected costs of implementing and conducting long-term stewardship of institutional controls and engineering controls at brownfield properties.

  6. Research and Development Program Plan for the Center for Engineering Systems Advanced Research (CESAR)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weisbin, C.R.; Barhen, J.; Hamel, W.R.

    1987-01-01

    A general framework is provided for more detailed planning on an annual basis, both for DOE and for other sponsoring organizations. The charter for the overall intelligent machine research effort is presented along with programmatic and technological goals. A research implementation plan is provided through the FY 1989 horizon.

  7. The systems engineering upgrade intiative at NASA's Jet Propulsion Laboratory

    NASA Technical Reports Server (NTRS)

    Jones, Ross M.

    2005-01-01

    JPL is implementing an initiative to significantly upgrade our systems engineering capabilities. This Systems Engineering Upgrade Initiative [SUI] has been authorized by the highest level technical management body of JPL and is sponsored with internal funds. The SUI objective is to upgrade system engineering at JPL to a level that is world class, professional and efficient compared to the FY04/05 baseline. JPL system engineering, along with the other engineering disciplines, is intended to support optimum designs; controlled and efficient implementations; and high quality, reliable, cost effective products. SUI technical activities are categorized into those dealing with people, process and tools. The purpose of this paper is to describe the rationale, objectives/plans and current status of the JPL SUI.

  8. A Qualitative Evaluation of the Use of Multimedia Case Studies in an Introductory Engineering Course at Two Southeastern Universities

    ERIC Educational Resources Information Center

    Huett, Kim C.; Kawulich, Barbara

    2015-01-01

    Collaborating at two universities to improve teaching and learning in undergraduate engineering, an interdisciplinary team of researchers, instructors, and evaluators planned and implemented the use of multimedia case studies with students enrolled in an introductory engineering course. This qualitative action evaluation study focuses on results…

  9. Software engineering and Ada (Trademark) training: An implementation model for NASA

    NASA Technical Reports Server (NTRS)

    Legrand, Sue; Freedman, Glenn

    1988-01-01

    The choice of Ada for software engineering for projects such as the Space Station has resulted in government and industrial groups considering training programs that help workers become familiar with both a software culture and the intricacies of a new computer language. The questions of how much time it takes to learn software engineering with Ada, how much an organization should invest in such training, and how the training should be structured are considered. Software engineering is an emerging, dynamic discipline. It is defined by the author as the establishment and application of sound engineering environments, tools, methods, models, principles, and concepts combined with appropriate standards, guidelines, and practices to support computing which is correct, modifiable, reliable and safe, efficient, and understandable throughout the life cycle of the application. Neither the training programs needed, nor the content of such programs, have been well established. This study addresses the requirements for training for NASA personnel and recommends an implementation plan. A curriculum and a means of delivery are recommended. It is further suggested that a knowledgeable programmer may be able to learn Ada in 5 days, but that it takes 6 to 9 months to evolve into a software engineer who uses the language correctly and effectively. The curriculum and implementation plan can be adapted for each NASA Center according to the needs dictated by each project.

  10. 77 FR 12651 - Approval of Air Quality Implementation Plans; California; San Joaquin Valley; Attainment Plan for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-01

    ... standards for which EPA has issued the waiver. CARB has as long a history of enforcement of vehicle/engine... program. The history and rigor of CARB's enforcement program lends assurance to California SIP revisions...

  11. 78 FR 24990 - Approval and Promulgation of Implementation Plans; Ohio; Volatile Organic Compound Emission...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-29

    ... that you telephone Steven Rosenthal, Environmental Engineer, at (312) 886-6052 before visiting the Region 5 office. FOR FURTHER INFORMATION CONTACT: Steven Rosenthal, Environmental Engineer, Attainment... Administrative Code (OAC). These include new fiberglass boat manufacturing, miscellaneous industrial adhesives...

  12. 40 CFR 52.2420 - Identification of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Enforceable, Implementation Plan, Potential to Emit, State Enforceable, Volatile Organic Compound 4/1/96 3/12..., Regulation of the Board, These regulations. Terms Revised—Good Engineering Practice, Person, Volatile organic... pressure, Vapor pressure, Volatile organic compounds. Terms Removed: Air Quality Maintenance Area. 5-10-20...

  13. Concepts, requirements, and design approaches for building successful planning and scheduling systems

    NASA Technical Reports Server (NTRS)

    Hornstein, Rhoda Shaller; Willoughby, John K.

    1991-01-01

    Traditional practice of systems engineering management assumes requirements can be precisely determined and unambiguously defined prior to system design and implementation; practice further assumes requirements are held static during implementation. Human-computer decision support systems for service planning and scheduling applications do not conform well to these assumptions. Adaptation to the traditional practice of systems engineering management are required. Basic technology exists to support these adaptations. Additional innovations must be encouraged and nutured. Continued partnership between the programmatic and technical perspective assures proper balance of the impossible with the possible. Past problems have the following origins: not recognizing the unusual and perverse nature of the requirements for planning and scheduling; not recognizing the best starting point assumptions for the design; not understanding the type of system that being built; and not understanding the design consequences of the operations concept selected.

  14. 77 FR 24933 - Notice of Proposed Information Collection Requests; Office of the Secretary; Race to the Top...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-26

    ... on their progress in the four core education reform areas and in Science, Technology, Engineering..., and ensuring student preparation for success in college and careers; and implementing ambitious plans... reform areas and in Science, Technology, Engineering, and Mathematics. This reporting includes narrative...

  15. Basic Gasoline Engine Mechanics. Florida Vocational Program Guide.

    ERIC Educational Resources Information Center

    University of South Florida, Tampa. Dept. of Adult and Vocational Education.

    This packet contains a program guide and Career Merit Achievement Plan (Career MAP) for the implementation of a basic gasoline engine mechanics program in Florida secondary and postsecondary schools. The program guide describes the program content and structure, provides a program description, lists job titles under the program, and includes a…

  16. 78 FR 19128 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Particulate Matter Standards

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-29

    ... holidays. We recommend that you telephone Matt Rau, Environmental Engineer, at (312) 886-6524 before visiting the Region 5 office. FOR FURTHER INFORMATION CONTACT: Matt Rau, Environmental Engineer, Control..., Restrictions on Particulate Emissions from Industrial Sources, on December 13, 2011. The revised rule was...

  17. Computer Engineering Technology. Florida Vocational Program Guide.

    ERIC Educational Resources Information Center

    University of South Florida, Tampa. Dept. of Adult and Vocational Education.

    This packet contains a program guide and Career Merit Achievement Plan (Career MAP) for the implementation of a computer engineering technology program in Florida secondary and postsecondary schools. The program guide describes the program content and structure, provides a program description, lists job titles under the program, and includes a…

  18. Deconstruction Geography: A STEM Approach

    ERIC Educational Resources Information Center

    Gehlhar, Adam M.; Duffield, Stacy K.

    2015-01-01

    This article will define the engineering design process used to create an integrated curriculum at STEM Center Middle School, and it features the planning, implementation, and revision of the Deconstruction Geography unit. The Science Technology Engineering and Math (STEM) Center opened in the fall of 2009 as a way to relieve overcrowding at the…

  19. Improving TOGAF ADM 9.1 Migration Planning Phase by ITIL V3 Service Transition

    NASA Astrophysics Data System (ADS)

    Hanum Harani, Nisa; Akhmad Arman, Arry; Maulana Awangga, Rolly

    2018-04-01

    Modification planning of business transformation involving technological utilization required a system of transition and migration planning process. Planning of system migration activity is the most important. The migration process is including complex elements such as business re-engineering, transition scheme mapping, data transformation, application development, individual involvement by computer and trial interaction. TOGAF ADM is the framework and method of enterprise architecture implementation. TOGAF ADM provides a manual refer to the architecture and migration planning. The planning includes an implementation solution, in this case, IT solution, but when the solution becomes an IT operational planning, TOGAF could not handle it. This paper presents a new model framework detail transitions process of integration between TOGAF and ITIL. We evaluated our models in field study inside a private university.

  20. Design and Implementation of Total Quality Management in a Civil Engineering Squadron

    DTIC Science & Technology

    1989-09-01

    instruct employees and seek new ways to integrate quality into all functions, such as planning, marketing , and controlling. The second strategy is for...implement a TQM plan that contributes to the overall DOD TQM process. 7 2. Managers at all levels will provide leadership and integrate TQM principles... integral part of our daily activities. 8 3. Quality improvement is the key to productivity improvement and must be pursued with the necessary resources to

  1. F100 multivariable control synthesis program: Evaluation of a multivariable control using a real-time engine simulation

    NASA Technical Reports Server (NTRS)

    Szuch, J. R.; Soeder, J. F.; Seldner, K.; Cwynar, D. S.

    1977-01-01

    The design, evaluation, and testing of a practical, multivariable, linear quadratic regulator control for the F100 turbofan engine were accomplished. NASA evaluation of the multivariable control logic and implementation are covered. The evaluation utilized a real time, hybrid computer simulation of the engine. Results of the evaluation are presented, and recommendations concerning future engine testing of the control are made. Results indicated that the engine testing of the control should be conducted as planned.

  2. 40 CFR 52.2565 - Original identification of plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) Amended Regulations VI and VII, and an Identification and Analysis of the Impact of the 1979 West Virginia... State of West Virginia on November 4, 1983 which establishes an Ambient Air Quality Monitoring Network...) Revision to the State implementation plan consisting of a good engineering practice (GEP) for stack heights...

  3. 40 CFR 52.2565 - Original identification of plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Amended Regulations VI and VII, and an Identification and Analysis of the Impact of the 1979 West Virginia... State of West Virginia on November 4, 1983 which establishes an Ambient Air Quality Monitoring Network...) Revision to the State implementation plan consisting of a good engineering practice (GEP) for stack heights...

  4. 40 CFR 52.2565 - Original identification of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Amended Regulations VI and VII, and an Identification and Analysis of the Impact of the 1979 West Virginia... State of West Virginia on November 4, 1983 which establishes an Ambient Air Quality Monitoring Network...) Revision to the State implementation plan consisting of a good engineering practice (GEP) for stack heights...

  5. 40 CFR 52.2565 - Original identification of plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) Amended Regulations VI and VII, and an Identification and Analysis of the Impact of the 1979 West Virginia... State of West Virginia on November 4, 1983 which establishes an Ambient Air Quality Monitoring Network...) Revision to the State implementation plan consisting of a good engineering practice (GEP) for stack heights...

  6. Community Involvement in Transportation Planning. Technical Report Series 37.

    ERIC Educational Resources Information Center

    Roden, David

    This paper is designed to assist city staffs and transportation agencies in organizing effective community involvement programs. The role of nontechnical information in the decision making process is addressed first, to help professional engineers and planners consider its importance in planning and implementation. In a chapter on value…

  7. Role of strategic planning in engineering management

    NASA Technical Reports Server (NTRS)

    Krishen, Kumar

    1993-01-01

    Today, more than ever before, engineers are faced with uncertain and sometimes chaotic environments in which to function. The traditional roles of an engineer to design, develop, and streamline a manufacturing process for a product are still valued and relevant. However, the need for an engineer to participate in the process of identifying the product to be developed, the schedule and resources required, and the goal of satisfying the customer, has become paramount to achieving the success of the enterprise. When we include these endeavors in the functions of an engineer, management of 'engineering' takes on a new dimension. In this paper, the ramifications of the changing and increased functions of an engineer and consequent impacts on engineering management are explored. The basic principles which should be invoked in order to embrace the new environment for engineering management are outlined. The ultimate finding of this study is that the enterprise strategic plan should be developed in such a way as to allow engineering management to encompass the full spectrum of the responsibilities of engineers. A consequence of this is that the fundamental elements of the strategic process can best be implemented through a project team or group approach. The paper thus concentrates on three areas: evolving environment, strategic plan, and ways to achieve enterprise success.

  8. 76 FR 31242 - Revisions to the California State Implementation Plan, Santa Barbara County Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-31

    ... BTU/hr and internal combustion engines with a rated brake horse power of 50 or greater. Under... Process Heaters. SBCAPCD 333 Control of Emissions 06/19/08 10/20/08 from Reciprocating Internal Combustion..., ``Control of Emissions from Reciprocating Internal Combustion Engines,'' adopted on June 19, 2008...

  9. 40 CFR 60.4216 - What requirements must I meet for engines used in Alaska?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... engines used in Alaska? 60.4216 Section 60.4216 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... alternative plan for implementing the requirements of 40 CFR part 60, subpart IIII, for public-sector electrical utilities located in rural areas of Alaska not accessible by the Federal Aid Highway System. This...

  10. The Deep Space Network

    NASA Technical Reports Server (NTRS)

    1977-01-01

    The various systems and subsystems are discussed for the Deep Space Network (DSN). A description of the DSN is presented along with mission support, program planning, facility engineering, implementation and operations.

  11. 40 CFR 52.2633 - Stack height regulations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wyoming § 52.2633 Stack height... with the “Guideline for Determination of Good Engineering Practice Stack Height (Technical Support...

  12. The Cooperate Assistive Teamwork Environment for Software Description Languages.

    PubMed

    Groenda, Henning; Seifermann, Stephan; Müller, Karin; Jaworek, Gerhard

    2015-01-01

    Versatile description languages such as the Unified Modeling Language (UML) are commonly used in software engineering across different application domains in theory and practice. They often use graphical notations and leverage visual memory for expressing complex relations. Those notations are hard to access for people with visual impairment and impede their smooth inclusion in an engineering team. Existing approaches provide textual notations but require manual synchronization between the notations. This paper presents requirements for an accessible and language-aware team work environment as well as our plan for the assistive implementation of Cooperate. An industrial software engineering team consisting of people with and without visual impairment will evaluate the implementation.

  13. SU-E-T-785: Using Systems Engineering to Design HDR Skin Treatment Operation for Small Lesions to Enhance Patient Safety

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Saw, C; Baikadi, M; Peters, C

    2015-06-15

    Purpose: Using systems engineering to design HDR skin treatment operation for small lesions using shielded applicators to enhance patient safety. Methods: Systems engineering is an interdisciplinary field that offers formal methodologies to study, design, implement, and manage complex engineering systems as a whole over their life-cycles. The methodologies deal with human work-processes, coordination of different team, optimization, and risk management. The V-model of systems engineering emphasize two streams, the specification and the testing streams. The specification stream consists of user requirements, functional requirements, and design specifications while the testing on installation, operational, and performance specifications. In implementing system engineering tomore » this project, the user and functional requirements are (a) HDR unit parameters be downloaded from the treatment planning system, (b) dwell times and positions be generated by treatment planning system, (c) source decay be computer calculated, (d) a double-check system of treatment parameters to comply with the NRC regulation. These requirements are intended to reduce human intervention to improve patient safety. Results: A formal investigation indicated that the user requirements can be satisfied. The treatment operation consists of using the treatment planning system to generate a pseudo plan that is adjusted for different shielded applicators to compute the dwell times. The dwell positions, channel numbers, and the dwell times are verified by the medical physicist and downloaded into the HDR unit. The decayed source strength is transferred to a spreadsheet that computes the dwell times based on the type of applicators and prescribed dose used. Prior to treatment, the source strength, dwell times, dwell positions, and channel numbers are double-checked by the radiation oncologist. No dosimetric parameters are manually calculated. Conclusion: Systems engineering provides methodologies to effectively design the HDR treatment operation that minimize human intervention and improve patient safety.« less

  14. Method and Tool for Design Process Navigation and Automatic Generation of Simulation Models for Manufacturing Systems

    NASA Astrophysics Data System (ADS)

    Nakano, Masaru; Kubota, Fumiko; Inamori, Yutaka; Mitsuyuki, Keiji

    Manufacturing system designers should concentrate on designing and planning manufacturing systems instead of spending their efforts on creating the simulation models to verify the design. This paper proposes a method and its tool to navigate the designers through the engineering process and generate the simulation model automatically from the design results. The design agent also supports collaborative design projects among different companies or divisions with distributed engineering and distributed simulation techniques. The idea was implemented and applied to a factory planning process.

  15. The Application of Concurrent Engineering Tools and Design Structure Matrix in Designing Tire

    NASA Astrophysics Data System (ADS)

    Ginting, Rosnani; Fachrozi Fitra Ramadhan, T.

    2016-02-01

    The development of automobile industry in Indonesia is growing rapidly. This phenomenon causes companies related to the automobile industry such as tire industry must develop products based on customers’ needs and considering the timeliness of delivering the product to the customer. It could be reached by applying strategic planning in developing an integrated concept of product development. This research was held in PT. XYZ that applied the sequential approach in designing and developing products. The need to improve in one stage of product development could occur re-designing that needs longer time in developing a new product. This research is intended to get an integrated product design concept of tire pertaining to the customer's needs using Concurrent Engineering Tools by implementing the two-phased of product development. The implementation of Concurrent Engineering approach results in applying the stage of project planning, conceptual design, and product modules. The product modules consist of four modules that using Product Architecture - Design Structure Matrix to ease the designing process of new product development.

  16. Planning, Implementation and Optimization of Future space Missions using an Immersive Visualization Environement (IVE) Machine

    NASA Astrophysics Data System (ADS)

    Harris, E.

    Planning, Implementation and Optimization of Future Space Missions using an Immersive Visualization Environment (IVE) Machine E. N. Harris, Lockheed Martin Space Systems, Denver, CO and George.W. Morgenthaler, U. of Colorado at Boulder History: A team of 3-D engineering visualization experts at the Lockheed Martin Space Systems Company have developed innovative virtual prototyping simulation solutions for ground processing and real-time visualization of design and planning of aerospace missions over the past 6 years. At the University of Colorado, a team of 3-D visualization experts are developing the science of 3-D visualization and immersive visualization at the newly founded BP Center for Visualization, which began operations in October, 2001. (See IAF/IAA-01-13.2.09, "The Use of 3-D Immersive Visualization Environments (IVEs) to Plan Space Missions," G. A. Dorn and G. W. Morgenthaler.) Progressing from Today's 3-D Engineering Simulations to Tomorrow's 3-D IVE Mission Planning, Simulation and Optimization Techniques: 3-D (IVEs) and visualization simulation tools can be combined for efficient planning and design engineering of future aerospace exploration and commercial missions. This technology is currently being developed and will be demonstrated by Lockheed Martin in the (IVE) at the BP Center using virtual simulation for clearance checks, collision detection, ergonomics and reach-ability analyses to develop fabrication and processing flows for spacecraft and launch vehicle ground support operations and to optimize mission architecture and vehicle design subject to realistic constraints. Demonstrations: Immediate aerospace applications to be demonstrated include developing streamlined processing flows for Reusable Space Transportation Systems and Atlas Launch Vehicle operations and Mars Polar Lander visual work instructions. Long-range goals include future international human and robotic space exploration missions such as the development of a Mars Reconnaissance Orbiter and Lunar Base construction scenarios. Innovative solutions utilizing Immersive Visualization provide the key to streamlining the mission planning and optimizing engineering design phases of future aerospace missions.

  17. Flight Test Engineering

    NASA Technical Reports Server (NTRS)

    Pavlock, Kate Maureen

    2013-01-01

    Although the scope of flight test engineering efforts may vary among organizations, all point to a common theme: flight test engineering is an interdisciplinary effort to test an asset in its operational flight environment. Upfront planning where design, implementation, and test efforts are clearly aligned with the flight test objective are keys to success. This chapter provides a top level perspective of flight test engineering for the non-expert. Additional research and reading on the topic is encouraged to develop a deeper understanding of specific considerations involved in each phase of flight test engineering.

  18. Sandia National Laboratories Advanced Simulation and Computing (ASC) software quality plan. Part 1 : ASC software quality engineering practices version 1.0.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Minana, Molly A.; Sturtevant, Judith E.; Heaphy, Robert

    2005-01-01

    The purpose of the Sandia National Laboratories (SNL) Advanced Simulation and Computing (ASC) Software Quality Plan is to clearly identify the practices that are the basis for continually improving the quality of ASC software products. Quality is defined in DOE/AL Quality Criteria (QC-1) as conformance to customer requirements and expectations. This quality plan defines the ASC program software quality practices and provides mappings of these practices to the SNL Corporate Process Requirements (CPR 1.3.2 and CPR 1.3.6) and the Department of Energy (DOE) document, ASCI Software Quality Engineering: Goals, Principles, and Guidelines (GP&G). This quality plan identifies ASC management andmore » software project teams' responsibilities for cost-effective software engineering quality practices. The SNL ASC Software Quality Plan establishes the signatories commitment to improving software products by applying cost-effective software engineering quality practices. This document explains the project teams opportunities for tailoring and implementing the practices; enumerates the practices that compose the development of SNL ASC's software products; and includes a sample assessment checklist that was developed based upon the practices in this document.« less

  19. 40 CFR 92.706 - Approval of plan: Implementation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) CONTROL OF AIR POLLUTION FROM LOCOMOTIVES AND LOCOMOTIVE ENGINES Recall Regulations § 92.706... days after the completion of such hearing, order the manufacturer or remanufacturer to provide prompt...

  20. 76 FR 17368 - Approval and Promulgation of Air Quality Implementation Plans; Louisiana; Determination of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-29

    ... failed to attain the 1-hour ozone standard by their attainment date. South Coast Air Quality Management... rationale for this action? \\3\\ As a result of the court decision in South Coast Air Quality Management.../MMBtu. Stationary Internal Combustion Engines: Lean-burn engines > 150 to 320 Hp 4 g/Hp-hr. Rich-burn...

  1. Engineering a Dynamic Science Learning Environment for K-12 Teachers

    ERIC Educational Resources Information Center

    Hardre, Patricia L.; Nanny, Mark; Refai, Hazen; Ling, Chen; Slater, Janis

    2010-01-01

    The present study follows a cohort of 17 K-12 teachers through a six-week resident learning experience in science and engineering, and on into the planning and implementation of applications for their classrooms. This Research Experiences for Teachers (RET) program was examined using the strategic approach of design-based research, with its fluid,…

  2. 76 FR 26609 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-09

    ... that manufacturers would be forced to alter the design or emission control equipment on new nonroad... in practical effect force manufacturers to alter the design or emission control equipment on new... manufacturer or user of a nonroad engine or vehicle to change the emission control design of the engine or...

  3. A strategic planning methodology for aircraft redesign

    NASA Astrophysics Data System (ADS)

    Romli, Fairuz Izzuddin

    Due to a progressive market shift to a customer-driven environment, the influence of engineering changes on the product's market success is becoming more prominent. This situation affects many long lead-time product industries including aircraft manufacturing. Derivative development has been the key strategy for many aircraft manufacturers to survive the competitive market and this trend is expected to continue in the future. Within this environment of design adaptation and variation, the main market advantages are often gained by the fastest aircraft manufacturers to develop and produce their range of market offerings without any costly mistakes. This realization creates an emphasis on the efficiency of the redesign process, particularly on the handling of engineering changes. However, most activities involved in the redesign process are supported either inefficiently or not at all by the current design methods and tools, primarily because they have been mostly developed to improve original product development. In view of this, the main goal of this research is to propose an aircraft redesign methodology that will act as a decision-making aid for aircraft designers in the change implementation planning of derivative developments. The proposed method, known as Strategic Planning of Engineering Changes (SPEC), combines the key elements of the product redesign planning and change management processes. Its application is aimed at reducing the redesign risks of derivative aircraft development, improving the detection of possible change effects propagation, increasing the efficiency of the change implementation planning and also reducing the costs and the time delays due to the redesign process. To address these challenges, four research areas have been identified: baseline assessment, change propagation prediction, change impact analysis and change implementation planning. Based on the established requirements for the redesign planning process, several methods and tools that are identified within these research areas have been abstracted and adapted into the proposed SPEC method to meet the research goals. The proposed SPEC method is shown to be promising in improving the overall efficiency of the derivative aircraft planning process through two notional aircraft system redesign case studies that are presented in this study.

  4. On-Line Planning and Mapping for Chemical Plume Tracing

    DTIC Science & Technology

    2004-06-01

    09 - 2005 Final Report 01/04/2001 - 31/10/2004 4. TITLE AND SUBTITLE Sa. CONTRACT NUMBER On-line Planning and Mapping for Chemical Plume Tracing 5b...PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) 8. PERFORMING ORGANIZATION REPORT NUMBER Department of Electrical Engineering University of California...develop, and implement on-vehicle planning and mapping theory and software to find, trace, and map chemical plumes. This objective included accurate

  5. Sandia National Laboratories Advanced Simulation and Computing (ASC) software quality plan. Part 1: ASC software quality engineering practices, Version 2.0.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sturtevant, Judith E.; Heaphy, Robert; Hodges, Ann Louise

    2006-09-01

    The purpose of the Sandia National Laboratories Advanced Simulation and Computing (ASC) Software Quality Plan is to clearly identify the practices that are the basis for continually improving the quality of ASC software products. The plan defines the ASC program software quality practices and provides mappings of these practices to Sandia Corporate Requirements CPR 1.3.2 and 1.3.6 and to a Department of Energy document, ASCI Software Quality Engineering: Goals, Principles, and Guidelines. This document also identifies ASC management and software project teams responsibilities in implementing the software quality practices and in assessing progress towards achieving their software quality goals.

  6. Integrated STEM Curriculum: Improving Educational Outcomes for Head Start Children

    ERIC Educational Resources Information Center

    Aldemir, Jale; Kermani, Hengameh

    2017-01-01

    In this study, the researchers aimed to design, plan and implement a Science, Technology, Engineering and Math (STEM) model to support Pre-K children's skills and knowledge in STEM as well as to improve Pre-K teachers' attitudes and professional skills to plan and integrate STEM concepts in their daily classroom activities. Four classrooms from a…

  7. Pathways to excellence: A Federal strategy for science, mathematics, engineering, and technology education

    NASA Astrophysics Data System (ADS)

    This Strategic Plan was developed by the Federal Coordinating Council for Science, Engineering, and Technology (FCCSET) through its Committee on Education and Human Resources (CEHR), with representatives from 16 Federal agencies. Based on two years of coordinated interagency effort, the Plan confirms the Federal Government's commitment to ensuring the health and well-being of science, mathematics, engineering, and technology education at all levels and in all sectors (i.e., elementary and secondary, undergraduate, graduate, public understanding of science, and technology education). The Plan represents the Federal Government's efforts to develop a five-year planning framework and associated milestones that focus Federal planning and the resources of the participating agencies toward achieving the requisite or expected level of mathematics and science competence by all students. The priority framework outlines the strategic objectives, implementation priorities, and components for the Strategic Plan and serves as a road map for the Plan. The Plan endorses a broad range of ongoing activities, including continued Federal support for graduate education as the backbone of our country's research and development enterprise. The Plan also identifies three tiers of program activities with goals that address issues in science, mathematics, engineering, and technology education meriting special attention. Within each tier, individual agency programs play important and often unique roles that strengthen the aggregate portfolio. The three tiers are presented in descending order of priority: (1) reforming the formal education system; (2) expanding participation and access; and (3) enabling activities.

  8. Pathways to excellence: A Federal strategy for science, mathematics, engineering, and technology education

    NASA Technical Reports Server (NTRS)

    1993-01-01

    This Strategic Plan was developed by the Federal Coordinating Council for Science, Engineering, and Technology (FCCSET) through its Committee on Education and Human Resources (CEHR), with representatives from 16 Federal agencies. Based on two years of coordinated interagency effort, the Plan confirms the Federal Government's commitment to ensuring the health and well-being of science, mathematics, engineering, and technology education at all levels and in all sectors (i.e., elementary and secondary, undergraduate, graduate, public understanding of science, and technology education). The Plan represents the Federal Government's efforts to develop a five-year planning framework and associated milestones that focus Federal planning and the resources of the participating agencies toward achieving the requisite or expected level of mathematics and science competence by all students. The priority framework outlines the strategic objectives, implementation priorities, and components for the Strategic Plan and serves as a road map for the Plan. The Plan endorses a broad range of ongoing activities, including continued Federal support for graduate education as the backbone of our country's research and development enterprise. The Plan also identifies three tiers of program activities with goals that address issues in science, mathematics, engineering, and technology education meriting special attention. Within each tier, individual agency programs play important and often unique roles that strengthen the aggregate portfolio. The three tiers are presented in descending order of priority: (1) reforming the formal education system; (2) expanding participation and access; and (3) enabling activities.

  9. Enterprise resource planning (ERP) implementation using the value engineering methodology and Six Sigma tools

    NASA Astrophysics Data System (ADS)

    Leu, Jun-Der; Lee, Larry Jung-Hsing

    2017-09-01

    Enterprise resource planning (ERP) is a software solution that integrates the operational processes of the business functions of an enterprise. However, implementing ERP systems is a complex process. In addition to the technical issues, companies must address problems associated with business process re-engineering, time and budget control, and organisational change. Numerous industrial studies have shown that the failure rate of ERP implementation is high, even for well-designed systems. Thus, ERP projects typically require a clear methodology to support the project execution and effectiveness. In this study, we propose a theoretical model for ERP implementation. The value engineering (VE) method forms the basis of the proposed framework, which integrates Six Sigma tools. The proposed framework encompasses five phases: knowledge generation, analysis, creation, development and execution. In the VE method, potential ERP problems related to software, hardware, consultation and organisation are analysed in a group-decision manner and in relation to value, and Six Sigma tools are applied to avoid any project defects. We validate the feasibility of the proposed model by applying it to an international manufacturing enterprise in Taiwan. The results show improvements in customer response time and operational efficiency in terms of work-in-process and turnover of materials. Based on the evidence from the case study, the theoretical framework is discussed together with the study's limitations and suggestions for future research.

  10. Development of an RDECOM Workforce Motivational Survey Instrument

    DTIC Science & Technology

    2016-09-01

    United States Army Research Development and Engineering Command ( RDECOM ) supervisory engineers, General Schedule (GS) 14 and 15, reviewed the survey...transition to the Human Resources directorate in RDECOM . Subsequently, we developed a plan to provide recommendations within the current government...for broad-level survey dissemination and performance of responses analyses by RDECOM to affect workforce policy change implementation. In conclusion

  11. Agile Port and High Speed Ship Technologies

    DTIC Science & Technology

    2009-12-31

    Alternative Shipboard Powering Systems for Naval and Regulatory Review • The Evaluation and Implementation Plan for Southern California Maglev ...Ackerman". CSULB Foundation Annual Report. CSULB Foundation, Long Beach, CA. December 2005. " Maglev Technology ’Conveys’ Port Transportation Solutions...34. Newsflash. College of Engineering, California State University, Long Beach. Cover page. Spring 2006 Hanson, Kristopher. "Engineers Tout Maglev at

  12. The MUSES Satellite Team and Multidisciplinary System Engineering

    NASA Technical Reports Server (NTRS)

    Chen, John C.; Paiz, Alfred R.; Young, Donald L.

    1997-01-01

    In a unique partnership between three minority-serving institutions and NASA's Jet Propulsion Laboratory, a new course sequence, including a multidisciplinary capstone design experience, is to be developed and implemented at each of the schools with the ambitious goal of designing, constructing and launching a low-orbit Earth-resources satellite. The three universities involved are North Carolina A&T State University (NCA&T), University of Texas, El Paso (UTEP), and California State University, Los Angeles (CSULA). The schools form a consortium collectively known as MUSES - Minority Universities System Engineering and Satellite. Four aspects of this project make it unique: (1) Including all engineering disciplines in the capstone design course, (2) designing, building and launching an Earth-resources satellite, (3) sustaining the partnership between the three schools to achieve this goal, and (4) implementing systems engineering pedagogy at each of the three schools. This paper will describe the partnership and its goals, the first design of the satellite, the courses developed at NCA&T, and the implementation plan for the course sequence.

  13. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Office of Civilian Radioactive Waste Management Systems Engineering Management Plan (OCRWM SEMP) specifies the technical management approach for the development of the waste management system, and specifies the approach for the development of each of the system elements -- the waste acceptance system, the transportation system, the Monitored Retrievable Storage (MRS) facility, and the mined geologic disposal system, which includes site characterization activity. The SEMP also delineates how systems engineering will be used by OCRWM to describe the system development process; it identifies responsibilities for its implementation, and specifies the minimum requirements for systems engineering. It also identifies themore » close interrelationship of system engineering and licensing processes. This SEMP, which is a combined OCRWM and M&O SEMP, is part of the top-level program documentation and is prepared in accordance with the direction provided in the Program Management System Manual (PMSM). The relationship of this document to other top level documents in the CRWMS document hierarchy is defined in the PMSM. A systems engineering management plan for each project, which specifies the actions to be taken in implementing systems engineering at the project level, shall be prepared by the respective project managers. [``Program`` refers to the CRWMS-wide activity and ``project`` refers to that level responsible for accomplishing the specific activities of that segment of the program.] The requirements for the project level SEMPs are addressed in Section 4.2.2.2. They represent the minimum set of requirements, and do not preclude the broadening of systems engineering activities to meet the specific needs of each project.« less

  14. System Engineering and Integration Contract for Implementation of the National Airspace System Plan. Volume 2. Section 5.0 NAS Plan Project Findings.

    DTIC Science & Technology

    1984-08-01

    and FPS-60 -’ vacuum-tube radars. There will be remote control interface units ( RCIU ) for tube-type radars, and an ARSR-3 relocation and RIH package...Facility RCE Remote Control Equipment; Radio Control Equipment RCIU Remote Control Interface Units RCO Remote Communications Outlet RDCC Research

  15. Low Temperature Cure Powder Coatings

    DTIC Science & Technology

    2013-05-01

    operations Minimize worker exposure to VOCs, HAPs, and hexavalent chrome Passed objective AF Engr Qual Plan = Air Force Engineer Quality Plan MIL-PRF...Inconclusive • Inconclusive • Not applicable (N/A) • Passed criteria Reduction of hexavalent chromium use • Passed objective Reduction of hazardous...compliance. The implementation of the OSHA Final Rule designating the permissible exposure limit (PEL) for hexavalent chromium is a significant

  16. 78 FR 26258 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Consent Decree Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-06

    ... withdrawn as of May 6, 2013. FOR FURTHER INFORMATION CONTACT: Sam Portanova, Environmental Engineer, Air... Boulevard, Chicago, Illinois 60604, (312) 886-3189, portanova.sam@epa.gov . SUPPLEMENTARY INFORMATION: EPA...

  17. Implementation of new pavement performance prediction models in PMIS : report

    DOT National Transportation Integrated Search

    2012-08-01

    Pavement performance prediction models and maintenance and rehabilitation (M&R) optimization processes : enable managers and engineers to plan and prioritize pavement M&R activities in a cost-effective manner. : This report describes TxDOTs effort...

  18. GUIDANCE FOR LANDFILLING WASTE IN ECONOMICALLY DEVELOPING COUNTRIES

    EPA Science Inventory

    The report offers guidance on all aspects of the planning, design, and implementation of landfills in economically developing countries. The intended audience includes municipal officials, solid waste managers, engineers, and planners. The report's 18 chapters include critical ...

  19. Developing the Systems Engineering Experience Accelerator (SEEA) Prototype and Roadmap

    DTIC Science & Technology

    2012-10-24

    system attributes. These metrics track non-requirements performance, typically relate to production cost per unit, maintenance costs, training costs...immediately implement lessons learned from the training experience to the job, assuming the culture allows this. 1.3 MANAGEMENT PLAN/TECHNICAL OVERVIEW...resolving potential conflicts as they arise. Incrementally implement and continuously integrate capability in priority order, to ensure that final system

  20. EMDS 3.0: A modeling framework for coping with complexity in environmental assessment and planning.

    Treesearch

    K.M. Reynolds

    2006-01-01

    EMDS 3.0 is implemented as an ArcMap® extension and integrates the logic engine of NetWeaver® to perform landscape evaluations, and the decision modeling engine of Criterium DecisionPlus® for evaluating management priorities. Key features of the system's evaluation component include abilities to (1) reason about large, abstract, multifaceted ecosystem management...

  1. 2005 8th Annual Systems Engineering Conference. Volume 2, Wednesday Presentations

    DTIC Science & Technology

    2005-10-27

    Acquisition Programs: An OSD Perspective, Col Warren Anderson, OUSD (AT&L) Defense Systems Implementation of Policy Requiring Systems Engineering Plans...Technical Excellence, Col Warren Anderson, OUSD (AT&L) Defense Systems Applying CMMI to System Safety, Mr. Tom Pfitzer, APT Research, Inc. System...to following pages for Tutorials Schedule) Buffett Lunch Tutorial Tracks (Please refer to following pages for Tutorials Schedule) Reception in

  2. What We've Learned From Doing Usability Testing on OpenURL Resolvers and Federated Search Engines

    ERIC Educational Resources Information Center

    Cervone, Frank

    2005-01-01

    OpenURL resolvers and federated search engines are important new services in the library field. For some librarians, these services may seem "old hat" by now, but for the majority these services are still in the early stages of implementation or planning. In many cases, these two services are offered as a seamlessly integrated whole.…

  3. The Plume Impingement Contamination II Experiment: Motivation, Design, and Implementation Plan

    NASA Technical Reports Server (NTRS)

    Lumpkin, Forrest E., III; Albyn, Keith C.; Farrell, Thomas L.

    2001-01-01

    The International Space Station (ISS) will have a long service life during which it must be able to serve as a capable platform for a wide variety of scientific investigations. In order to provide this capability, the ISS has, at the system level, a design requirement of no more than 100 Angstroms of contaminant deposition per year from "non-quiescent" sources. Non-quiescent sources include the plumes resulting from the firing of reaction control system (ReS) engines on space vehicles visiting the ISS as well as the engines on the ISS itself. Unfortunately, good general plume contamination models do not yet exist. This is due both to the complexity of the problem, making the analytic approach difficult, and to the difficulty in obtaining empirical measurements of contaminant depositions. To address this lack of flight data, NASA Johnson Space Center is planning to fly an experiment, Plume Impingement Contamination-II, to measure the contamination deposition from the Shuttle Orbiter's primary RCS engines as a function angle from plume centerline. This represents the first direct on-orbit measurement of plume impingement contamination away from the nozzle centerline ever performed, and as such is extremely important in validating mathematical models which will be used to quantify the cumulative plume impingement contamination to the ISS over its lifetime. The paper will elaborate further upon the motivation behind making these measurements as well as present the design and implementation plan of this planned experiment.

  4. Systems Engineering and Integration for Technology Programs

    NASA Technical Reports Server (NTRS)

    Kennedy, Kruss J.

    2006-01-01

    The Architecture, Habitability & Integration group (AH&I) is a system engineering and integration test team within the NASA Crew and Thermal Systems Division (CTSD) at Johnson Space Center. AH&I identifies and resolves system-level integration issues within the research and technology development community. The timely resolution of these integration issues is fundamental to the development of human system requirements and exploration capability. The integration of the many individual components necessary to construct an artificial environment is difficult. The necessary interactions between individual components and systems must be approached in a piece-wise fashion to achieve repeatable results. A formal systems engineering (SE) approach to define, develop, and integrate quality systems within the life support community has been developed. This approach will allow a Research & Technology Program to systematically approach the development, management, and quality of technology deliverables to the various exploration missions. A tiered system engineering structure has been proposed to implement best systems engineering practices across all development levels from basic research to working assemblies. These practices will be implemented through a management plan across all applicable programs, projects, elements and teams. While many of the engineering practices are common to other industries, the implementation is specific to technology development. An accounting of the systems engineering management philosophy will be discussed and the associated programmatic processes will be presented.

  5. Enabling Incremental Query Re-Optimization.

    PubMed

    Liu, Mengmeng; Ives, Zachary G; Loo, Boon Thau

    2016-01-01

    As declarative query processing techniques expand to the Web, data streams, network routers, and cloud platforms, there is an increasing need to re-plan execution in the presence of unanticipated performance changes. New runtime information may affect which query plan we prefer to run. Adaptive techniques require innovation both in terms of the algorithms used to estimate costs , and in terms of the search algorithm that finds the best plan. We investigate how to build a cost-based optimizer that recomputes the optimal plan incrementally given new cost information, much as a stream engine constantly updates its outputs given new data. Our implementation especially shows benefits for stream processing workloads. It lays the foundations upon which a variety of novel adaptive optimization algorithms can be built. We start by leveraging the recently proposed approach of formulating query plan enumeration as a set of recursive datalog queries ; we develop a variety of novel optimization approaches to ensure effective pruning in both static and incremental cases. We further show that the lessons learned in the declarative implementation can be equally applied to more traditional optimizer implementations.

  6. Enabling Incremental Query Re-Optimization

    PubMed Central

    Liu, Mengmeng; Ives, Zachary G.; Loo, Boon Thau

    2017-01-01

    As declarative query processing techniques expand to the Web, data streams, network routers, and cloud platforms, there is an increasing need to re-plan execution in the presence of unanticipated performance changes. New runtime information may affect which query plan we prefer to run. Adaptive techniques require innovation both in terms of the algorithms used to estimate costs, and in terms of the search algorithm that finds the best plan. We investigate how to build a cost-based optimizer that recomputes the optimal plan incrementally given new cost information, much as a stream engine constantly updates its outputs given new data. Our implementation especially shows benefits for stream processing workloads. It lays the foundations upon which a variety of novel adaptive optimization algorithms can be built. We start by leveraging the recently proposed approach of formulating query plan enumeration as a set of recursive datalog queries; we develop a variety of novel optimization approaches to ensure effective pruning in both static and incremental cases. We further show that the lessons learned in the declarative implementation can be equally applied to more traditional optimizer implementations. PMID:28659658

  7. The development of a Flight Test Engineer's Workstation for the Automated Flight Test Management System

    NASA Technical Reports Server (NTRS)

    Tartt, David M.; Hewett, Marle D.; Duke, Eugene L.; Cooper, James A.; Brumbaugh, Randal W.

    1989-01-01

    The Automated Flight Test Management System (ATMS) is being developed as part of the NASA Aircraft Automation Program. This program focuses on the application of interdisciplinary state-of-the-art technology in artificial intelligence, control theory, and systems methodology to problems of operating and flight testing high-performance aircraft. The development of a Flight Test Engineer's Workstation (FTEWS) is presented, with a detailed description of the system, technical details, and future planned developments. The goal of the FTEWS is to provide flight test engineers and project officers with an automated computer environment for planning, scheduling, and performing flight test programs. The FTEWS system is an outgrowth of the development of ATMS and is an implementation of a component of ATMS on SUN workstations.

  8. Mass Transit: Implementation of FTA’s New Starts Evaluation Process and FY 2001 Funding Proposals

    DTIC Science & Technology

    2000-04-01

    formalize the process. FTA issued a proposed rule on April 7, 1999, and plans to issue final regulations by the summer of 2000. In selecting projects for...commit funds to any more New Starts projects during the last 2 years of TEA-21—through fiscal year 2003. Because there are plans for many more...regional review of alternatives, develop preliminary engineering plans , and meet FTA’s approval for the final design. TEA-21 requires that FTA evaluate

  9. Halon 1301 management planning guidance

    NASA Astrophysics Data System (ADS)

    1995-05-01

    This ETL provides guidance to help the Base Civil Engineer (BCE) and other users manage inventories of Halon 1301, an ozone depleting substance used in many facility fire protection systems. This guidance will allow Halon 1301 users to develop the transition plans necessary to implement the DOD and Air Force policies on ozone depleting substances. Attachment 3 to this ETL contains detailed instructions on how to develop a Base Halon 1 301 Management Plan and comply with Air Force policies and regulations designed to minimize dependency on Halon 1301.

  10. Systems Engineering and Management Applications of ISO 9001:2015 for Government

    NASA Technical Reports Server (NTRS)

    Shepherd, Christena C.

    2016-01-01

    The manufacturing segment of the business world is busy assessing the impact of ISO 9001:2015, and updating their management systems to meet the required compliance date. What does the new revision mean for government agencies that deliver large engineering projects rather than mass production? In fact, the standard, especially the new revision, can be used quite readily for government agencies, or applied to specific projects, once it is understood in terms of the similarities with systems engineering and project management. From there it can be extrapolated to "mission realization" systems, and a Quality Management System (QMS) is a logical result that can bring order to processes and systems that likely already exist in some fashion. ISO 9001:2015 is less product-oriented than previous versions. It can be more broadly applied to public organizations as well as private; and to services (missions) as well as products. The emphasis on risk management in the revised standard provides the needed balance for weighing decisions with respect to cost, schedule, technical, safety, and regulatory compliance; so if this is not part of agency governance already, this is a good place to start, especially for large engineering projects. The Systems Engineering standard used for this analysis is from NASA's NPR 7123.1 NASA Systems Engineering Processes and Requirements; however, those who are more familiar with ISO/IEC 26702 Systems Engineering-application and management of the systems engineering process, or SAE/EIA 632 Processes for Engineering a System will also recognize the similarities. In reality, the QMS outlined by ISO 9001 reinforces the systems engineering processes, and serves to ensure that they are adequately implemented, although most of the ISO 9001 literature emphasizes the production and process aspects of the standard. Rather than beginning with ISO 9001and getting lost in the vocabulary, it is useful to begin with the systems engineering lifecycle. Identification of stakeholder expectations, identifying solutions, creating specific product or service designs, production of the product or service, delivery to the public, and the associated management, planning, and control processes, are a familiar place to begin thinking of the overall system of identifying, designing, and competing a project or mission. Lining up this lifecycle with the ISO requirements (see Figure 1) illustrates how a quality management system is concerned with the same processes, and provides a governance and assurance function. If implemented properly, there are cost savings resulting from less rework, repair, reprocessing, failures, misplaced documents, and similar types of deficiencies1. Starting with an organization's systems engineering processes allows the organization to use their own terminology for a QMS plan, and tailor the plan to their own project or organization, so that it is more easily developed, understood, and implemented.

  11. Westinghouse corporate development of a decision software program for Radiological Evaluation Decision Input (REDI)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bush, T.S.

    1995-03-01

    In December 1992, the Department of Energy (DOE) implemented the DOE Radiological Control Manual (RCM). Westinghouse Idaho Nuclear Company, Inc. (WINCO) submitted an implementation plan showing how compliance with the manual would be achieved. This implementation plan was approved by DOE in November 1992. Although WINCO had already been working under a similar Westinghouse RCM, the DOE RCM brought some new and challenging requirements. One such requirement was that of having procedure writers and job planners create the radiological input in work control procedures. Until this time, that information was being provided by radiological engineering or a radiation safety representative.more » As a result of this requirement, Westinghouse developed the Radiological Evaluation Decision Input (REDI) program.« less

  12. Advanced Launch System advanced development oxidizer turbopump program: Technical implementation plan

    NASA Technical Reports Server (NTRS)

    Ferlita, F.

    1989-01-01

    The Advanced Launch Systems (ALS) Advanced Development Oxidizer Turbopump Program has designed, fabricated and demonstrated a low cost, highly reliable oxidizer turbopump for the Space Transportation Engine that minimizes the recurring cost for the ALS engines. Pratt and Whitney's (P and W's) plan for integrating the analyses, testing, fabrication, and other program efforts is addressed. This plan offers a comprehensive description of the total effort required to design, fabricate, and test the ALS oxidizer turbopump. The proposed ALS oxidizer turbopump reduces turbopump costs over current designs by taking advantage of design simplicity and state-of-the-art materials and producibility features without compromising system reliability. This is accomplished by selecting turbopump operating conditions that are within known successful operating regions and by using proven manufacturing techniques.

  13. California State Implementation Plan (SIP); Proposed Mobile Source Regulations

    EPA Pesticide Factsheets

    EPA is proposing to approve a submittal by the California to revise its SIP establishing standards and other requirements relating to the control of emissions from certain new and in-use on-road and off-road vehicles and engines.

  14. GUIDANCE AVAILABLE FOR LANDFILLING WASTE IN ECONOMICALLY DEVELOPING COUNTRIES

    EPA Science Inventory

    The paper provides a brief summary of a report that offers guidance on all aspects of the planning, design, and implementation of landfills in economically developing countries. The intended audience includes municipal officials, solid waste managers, engineers, and planners. T...

  15. Expected treatment dose construction and adaptive inverse planning optimization: Implementation for offline head and neck cancer adaptive radiotherapy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yan Di; Liang Jian

    Purpose: To construct expected treatment dose for adaptive inverse planning optimization, and evaluate it on head and neck (h and n) cancer adaptive treatment modification. Methods: Adaptive inverse planning engine was developed and integrated in our in-house adaptive treatment control system. The adaptive inverse planning engine includes an expected treatment dose constructed using the daily cone beam (CB) CT images in its objective and constrains. Feasibility of the adaptive inverse planning optimization was evaluated retrospectively using daily CBCT images obtained from the image guided IMRT treatment of 19 h and n cancer patients. Adaptive treatment modification strategies with respect tomore » the time and the number of adaptive inverse planning optimization during the treatment course were evaluated using the cumulative treatment dose in organs of interest constructed using all daily CBCT images. Results: Expected treatment dose was constructed to include both the delivered dose, to date, and the estimated dose for the remaining treatment during the adaptive treatment course. It was used in treatment evaluation, as well as in constructing the objective and constraints for adaptive inverse planning optimization. The optimization engine is feasible to perform planning optimization based on preassigned treatment modification schedule. Compared to the conventional IMRT, the adaptive treatment for h and n cancer illustrated clear dose-volume improvement for all critical normal organs. The dose-volume reductions of right and left parotid glands, spine cord, brain stem and mandible were (17 {+-} 6)%, (14 {+-} 6)%, (11 {+-} 6)%, (12 {+-} 8)%, and (5 {+-} 3)% respectively with the single adaptive modification performed after the second treatment week; (24 {+-} 6)%, (22 {+-} 8)%, (21 {+-} 5)%, (19 {+-} 8)%, and (10 {+-} 6)% with three weekly modifications; and (28 {+-} 5)%, (25 {+-} 9)%, (26 {+-} 5)%, (24 {+-} 8)%, and (15 {+-} 9)% with five weekly modifications. Conclusions: Adaptive treatment modification can be implemented including the expected treatment dose in the adaptive inverse planning optimization. The retrospective evaluation results demonstrate that utilizing the weekly adaptive inverse planning optimization, the dose distribution of h and n cancer treatment can be largely improved.« less

  16. Spacecraft systems engineering: An introduction to the process at GSFC

    NASA Technical Reports Server (NTRS)

    Fragomeni, Tony; Ryschkewitsch, Michael G.

    1993-01-01

    The main objective in systems engineering is to devise a coherent total system design capable of achieving the stated requirements. Requirements should be rigid. However, they should be continuously challenged, rechallenged and/or validated. The systems engineer must specify every requirement in order to design, document, implement and conduct the mission. Each and every requirement must be logically considered, traceable and evaluated through various analysis and trade studies in a total systems design. Margins must be determined to be realistic as well as adequate. The systems engineer must also continuously close the loop and verify system performance against the requirements. The fundamental role of the systems engineer, however, is to engineer, not manage. Yet, in large, complex missions, where more than one systems engineer is required, someone needs to manage the systems engineers, and we call them 'systems managers.' Systems engineering management is an overview function which plans, guides, monitors and controls the technical execution of a project as implemented by the systems engineers. As the project moves on through Phases A and B into Phase C/D, the systems engineering tasks become a small portion of the total effort. The systems management role increases since discipline subsystem engineers are conducting analyses and reviewing test data for final review and acceptance by the systems managers.

  17. Implementing Effective Mission Systems Engineering Practices During Early Project Formulation Phases

    NASA Technical Reports Server (NTRS)

    Moton, Tryshanda

    2016-01-01

    Developing and implementing a plan for a NASA space mission can be a complicated process. The needs, goals, and objectives of any proposed mission or technology must be assessed early in the Project Life Cycle. The key to successful development of a space mission or flight project is the inclusion of systems engineering in early project formulation, namely during Pre-phase A, Phase A, and Phase B of the NASA Project Life Cycle. When a space mission or new technology is in pre-development, or "pre-Formulation", feasibility must be determined based on cost, schedule, and risk. Inclusion of system engineering during project formulation is key because in addition to assessing feasibility, design concepts are developed and alternatives to design concepts are evaluated. Lack of systems engineering involvement early in the project formulation can result in increased risks later in the implementation and operations phases of the project. One proven method for effective systems engineering practice during the pre-Formulation Phase is the use of a mission conceptual design or technology development laboratory, such as the Mission Design Lab (MDL) at NASA's Goddard Space Flight Center (GSFC). This paper will review the engineering process practiced routinely in the MDL for successful mission or project development during the pre-Formulation Phase.

  18. Map, Excite, Jump, and Measure: An Outreach Activity That Utilizes Seismology to Engage Students in Technology, Science, Engineering, and Mathematics

    NASA Astrophysics Data System (ADS)

    van der Lee, S.; Tekverk, K.; Rooney, K.; Boxerman, J.

    2013-12-01

    We designed and will present a lesson plan to teach students STEM concepts through seismology. The plan addresses new generation science standards in the Framework for K-12 Science Education as well AAAS Benchmarks for Science Literacy. The plan can be executed at a facility with a seismometer in a research facility or university, on a field trip, but it can also be used in a school setting with a school seismometer. Within the lesson plan, the students first use technology to obtain earthquake location data and map them. Next, the students learn about the science of earthquakes, which is followed by an engineering activity in which the students design a hypothetical seismometer and interact with the actual seismometer and live data display. Lastly the students use mathematics to locate an earthquake through trilateration. The lesson plan has been fine-tuned through implementation with over 150 students from grades 3-12 from the Chicago area.

  19. The development of local calibration factors for implementing the highway safety manual in Maryland : research summary.

    DOT National Transportation Integrated Search

    2014-03-01

    One of the best strategies to improve traffic safety and reduce motor vehicle traffic : crashes is to provide well-planned engineering, education, and enforcement : countermeasures that are tailored to given crash, traffic, and roadway : characterist...

  20. Lean and Efficient Software: Whole-Program Optimization of Executables

    DTIC Science & Technology

    2013-01-03

    staffing for the project  Implementing the necessary infrastructure ( testing, performance evaluation, needed support software, bug and issue...in the SOW The result of the planning discussions is shown in the milestone table (section 6). In addition, we selected appropriate engineering

  1. Systems engineering management plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    DOT National Transportation Integrated Search

    2010-12-01

    The purpose of the Dallas ICM System is to implement a multi-modal operations decision support tool enabled by real-time data pertaining to the operation of freeways, arterials, and public transit. The system will be shared between information system...

  2. Web Tools Streamline Climate Preparedness and Resilience Planning and Implementation for Water Resources Infrastructure

    NASA Astrophysics Data System (ADS)

    White, K. D.; Friedman, D.; Schechter, J.; Foley, P.; Mueller, C.; Baker, B.; Huber, M.; Veatch, W.

    2016-12-01

    Observed and projected impacts of climate change are pronounced on the hydrologic cycle because of the sensitivity of hydroclimatic variables to changes in temperature. Well-documented climate change impacts to the hydrologic cycle include increases in extreme heat conditions, coastal flooding, heavy precipitation, and drought frequency and magnitude, all of which can combine in surprising ways to pose regionally varying threats to public health and safety, ecosystem functions, and the economy. Climate preparedness and resilience activities are therefore necessary for water infrastructure which provides flood risk reduction, navigation, water supply, ecosystem restoration, and hydropower services. Because this water infrastructure entails long lifetimes, up to or beyond 100 years, and significant public investment, accurate and timely information about climate impacts over both the near-and far-term is required to plan and implement climate preparedness and resilience measures. Engineers are natural translators of science into actionable information to support this type of decision-making, because they understand both the important physical processes and the processes, laws, standards, and criteria required for the planning and design of public infrastructure. Though engineers are capable of the data management activities needed to ingest, transform, and prepare climate information for use in these decisions, the US Army Corps of Engineers (USACE) has chosen to emphasize analysis of information over data management. In doing so, the USACE is developing and using web tools with visualization capabilities to streamline climate preparedness and resilience planning and implementation while ensuring repeatable analytical results nationally. Examples discussed here include calculation of sea level change, including a comparison of mean sea level and other tidal statistics against scenarios of change; detection of abrupt and slowly varying nonstationarities in observed hydrologic data; and evaluations of projected flow frequency and duration that help to characterize future conditions and facilitate comparisons to observed conditions.

  3. A Computer Engineering Curriculum for the Air Force Academy: An Implementation Plan

    DTIC Science & Technology

    1985-04-01

    engineerinq is needed as a r ul of the findings? 5. What is the impact of this study’s rocommendat ion to pursue the Electrico I Engineering deqree with onpt...stepper motor 9 S35 LAB 36 Serial 10 S37 GR #3 - 38 8251 10 chip ) 39 LAB serial 10 10 * 40 LAB " 1)41 LAB S 42 Course review - S FINAL EXAM 00 % 80 0

  4. The Department of Defense Net-Centric Data Strategy: Implementation Requires a Joint Community of Interest (COI) Working Group and Joint COI Oversight Council

    DTIC Science & Technology

    2007-05-17

    metadata formats, metadata repositories, enterprise portals and federated search engines that make data visible, available, and usable to users...and provides the metadata formats, metadata repositories, enterprise portals and federated search engines that make data visible, available, and...develop an enterprise- wide data sharing plan, establishment of mission area governance processes for CIOs, DISA development of federated search specifications

  5. ONRASIA Scientific Information Bulletin. Volume 17, Number 4, October-December 1992

    DTIC Science & Technology

    1992-12-01

    Corporate Software Planning Oki’s Software Improvement Environment and Engineering Div. Strategy - Effective Management - Improvement of Informa- Mr...a CCITT-supported implementation phase. -- David K fore we have effectively implemented ISO Standard high-level language Kahaner, ONRASIA them...power with a system fo- putation) Result cused on their specific needs. Result Effective speed should be (Readers can write to me or to 150 times VP-400

  6. Local Area Networks.

    ERIC Educational Resources Information Center

    Nasatir, Marilyn; And Others

    1990-01-01

    Four papers discuss LANs (local area networks) and library applications: (1) "Institute for Electrical and Electronic Engineers Standards..." (Charles D. Brown); (2) "Facilities Planning for LANs..." (Gail Persky); (3) "Growing up with the Alumni Library: LAN..." (Russell Buchanan); and (4) "Implementing a LAN...at the Health Sciences Library"…

  7. Mass drivers. 3: Engineering

    NASA Technical Reports Server (NTRS)

    Arnold, W.; Bowen, S.; Cohen, S.; Fine, K.; Kaplan, D.; Kolm, M.; Kolm, H.; Newman, J.; Oneill, G. K.; Snow, W.

    1979-01-01

    The last of a series of three papers by the Mass-Driver Group of the 1977 Ames Summer Study is presented. It develops the engineering principles required to implement the basic mass-driver. Optimum component mass trade-offs are derived from a set of four input parameters, and the program used to design a lunar launcher. The mass optimization procedures is then incorporated into a more comprehensive mission optimization program called OPT-4, which evaluates an optimized mass-driver reaction engine and its performance in a range of specified missions. Finally, this paper discusses, to the extent that time permitted, certain peripheral problems: heating effects in buckets due to magnetic field ripple; an approximate derivation of guide force profiles; the mechanics of inserting and releasing payloads; the reaction mass orbits; and a proposed research and development plan for implementing mass drivers.

  8. V&V Plan for FPGA-based ESF-CCS Using System Engineering Approach.

    NASA Astrophysics Data System (ADS)

    Maerani, Restu; Mayaka, Joyce; El Akrat, Mohamed; Cheon, Jung Jae

    2018-02-01

    Instrumentation and Control (I&C) systems play an important role in maintaining the safety of Nuclear Power Plant (NPP) operation. However, most current I&C safety systems are based on Programmable Logic Controller (PLC) hardware, which is difficult to verify and validate, and is susceptible to software common cause failure. Therefore, a plan for the replacement of the PLC-based safety systems, such as the Engineered Safety Feature - Component Control System (ESF-CCS), with Field Programmable Gate Arrays (FPGA) is needed. By using a systems engineering approach, which ensures traceability in every phase of the life cycle, from system requirements, design implementation to verification and validation, the system development is guaranteed to be in line with the regulatory requirements. The Verification process will ensure that the customer and stakeholder’s needs are satisfied in a high quality, trustworthy, cost efficient and schedule compliant manner throughout a system’s entire life cycle. The benefit of the V&V plan is to ensure that the FPGA based ESF-CCS is correctly built, and to ensure that the measurement of performance indicators has positive feedback that “do we do the right thing” during the re-engineering process of the FPGA based ESF-CCS.

  9. Failure mode analysis to predict product reliability.

    NASA Technical Reports Server (NTRS)

    Zemanick, P. P.

    1972-01-01

    The failure mode analysis (FMA) is described as a design tool to predict and improve product reliability. The objectives of the failure mode analysis are presented as they influence component design, configuration selection, the product test program, the quality assurance plan, and engineering analysis priorities. The detailed mechanics of performing a failure mode analysis are discussed, including one suggested format. Some practical difficulties of implementation are indicated, drawn from experience with preparing FMAs on the nuclear rocket engine program.

  10. Status of Real-Time Laser Based Ion Engine Diagnostics at NASA Glenn Research Center

    NASA Technical Reports Server (NTRS)

    Domonkos, Matthew T.; Williams, George J., Jr.

    2001-01-01

    The development status of laser based erosion diagnostics for ion engines at the NASA Glenn Research Center is discussed. The diagnostics are being developed to enhance component life-prediction capabilities. A direct measurement of the erosion product density using laser induced fluorescence (LIF) is described. Erosion diagnostics based upon evaluation of the ion dynamics are also under development, and the basic approach is presented. The planned implementation of the diagnostics is discussed.

  11. Guide to data collection

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Guidelines and recommendations are presented for the collection of software development data. Motivation and planning for, and implementation and management of, a data collection effort are discussed. Topics covered include types, sources, and availability of data; methods and costs of data collection; types of analyses supported; and warnings and suggestions based on software engineering laboratory (SEL) experiences. This document is intended as a practical guide for software managers and engineers, abstracted and generalized from 5 years of SEL data collection.

  12. The effects of high energy particles on planetary missions

    NASA Technical Reports Server (NTRS)

    Robinson, Paul A., Jr.

    1988-01-01

    Researchers review the background and motivation for the detailed study of the variability and uncertainty of the particle environment from a space systems planning perspective. The engineering concern raised by each environment is emphasized rather than the underlying physics of the magnetosphere or the sun. Missions now being planned span the short term range of one to three years to periods over ten years. Thus the engineering interest is beginning to stretch over periods of several solar cycles. Coincidentally, detailed measurements of the environment are now becoming available over that period of time. Both short term and long term environmental predictions are needed for proper mission planning. Short term predictions, perhaps based on solar indices, real time observations, or short term systematics, are very useful in near term planning -- launches, EVAs (extravehicular activities), coordinated observations, and experiments which require the magnetosphere to be in a certain state. Long term predictions of both average and extreme conditions are essential to mission design. Engineering considerations are many times driven by the worst case environment. Knowledge of the average conditions and their variability allows trade-off studies to be made, implementation of designs which degrade gracefully under multi-stress environments.

  13. A systems engineering management approach to resource management applications

    NASA Technical Reports Server (NTRS)

    Hornstein, Rhoda Shaller

    1989-01-01

    The author presents a program management response to the following question: How can the traditional practice of systems engineering management, including requirements specification, be adapted, enhanced, or modified to build future planning and scheduling systems for effective operations? The systems engineering management process, as traditionally practiced, is examined. Extensible resource management systems are discussed. It is concluded that extensible systems are a partial solution to problems presented by requirements that are incomplete, partially immeasurable, and often dynamic. There are positive indications that resource management systems have been characterized and modeled sufficiently to allow their implementation as extensible systems.

  14. System Engineering and Integration Contract for Implementation of the National Airspace System Plan. Volume 1. Sections 1.0-4.0, 6.0.

    DTIC Science & Technology

    1984-08-01

    recommendations in the report with Martin Marietta over the next few months. Appropriate followup actions will be deter- mined, and any program changes...Technical Feasibility and Validity ...... . . .. 1-6 1.3.2 Program Schedule . . . . . . ......... . .. 1-7 1.3.3 NAS Plan Cost...343.1.1 Overview 3-1 3.1.2 Findings, Risks, and Recommendations . . . . . . . . . 3-3 3.2 Program Schedule . . . . . . . . . . * . . * . *. . 3-6

  15. Improving the Simplified Acquisition of Base Engineering Requirements (SABER) Delivery Order Award Process: Results of a Process Improvement Plan

    DTIC Science & Technology

    1991-09-01

    putting all tasks directed towsrds achieving an outcome in aequence. The tasks can be viewed as steps in the process (39:2.3). Using this...improvement opportunity is investigated. A plan is developed, root causes are identified, and solutions are tested and implemented. The process is... solutions , check for actual improvement, and integrate the successful improvements into the process. ?UP 7. Check Improvement Performance. Finally, the

  16. Personnel Requirements Consideration in Major Weapon System Acquisition. Research Planning Report

    DTIC Science & Technology

    1980-03-01

    of scientific study of human attributes associated with job performance. Sir Francis Galton (1822-1911) is considered the father of engineering...analysis of nonrelevant factors. Implementation of this plan will result in construction and pilot testing of a computer based branching decision...logic in 1980-81 and field testing and evaluation in 1981-82. . . 1. SSCuaITY CLASIPICATION Op TuiS PAOI(’I.A baa. Seoto, I Finch, F.L., Rigg, K.E. and

  17. 30 CFR 880.13 - Project implementation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... will design, plan, and engineer a method of operation for control or extinguishment of the outcrop or... in phases, a series of project contracts. (2) If OSM assistance is required, OSM will be reimbursed by the State or Indian tribe for all costs incurred, including OSM employees' time. (b) In States and...

  18. 30 CFR 880.13 - Project implementation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... will design, plan, and engineer a method of operation for control or extinguishment of the outcrop or... in phases, a series of project contracts. (2) If OSM assistance is required, OSM will be reimbursed by the State or Indian tribe for all costs incurred, including OSM employees' time. (b) In States and...

  19. 30 CFR 880.13 - Project implementation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... will design, plan, and engineer a method of operation for control or extinguishment of the outcrop or... in phases, a series of project contracts. (2) If OSM assistance is required, OSM will be reimbursed by the State or Indian tribe for all costs incurred, including OSM employees' time. (b) In States and...

  20. 30 CFR 880.13 - Project implementation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... will design, plan, and engineer a method of operation for control or extinguishment of the outcrop or... in phases, a series of project contracts. (2) If OSM assistance is required, OSM will be reimbursed by the State or Indian tribe for all costs incurred, including OSM employees' time. (b) In States and...

  1. 30 CFR 880.13 - Project implementation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... will design, plan, and engineer a method of operation for control or extinguishment of the outcrop or... in phases, a series of project contracts. (2) If OSM assistance is required, OSM will be reimbursed by the State or Indian tribe for all costs incurred, including OSM employees' time. (b) In States and...

  2. Strategic Goals Implementation Plan V2.0

    DTIC Science & Technology

    2008-01-01

    newest ATARS ground station. (Sep 08) (DDR&E) 3.1.6 Take proactive steps to transition technology programs. DUSD(AS&C) • Proactive steps taken to...increases emphasis on math as gateway to physical science and engineering. • Expanded footprint of S&E education in Middle School. 3.3.4 Support

  3. Laboratory characterization of materials & data management for Ohio-SHRP Projects (U.S. 23) : research implementation plan.

    DOT National Transportation Integrated Search

    2006-02-01

    Highway design engineers in the U.S. have been relying on the 1986-1993 American Association of State Highway : and Transportation Officials (AASHTO) Design Guide, which is based on the many empirical elements obtained in : the 40-year old AASTHO Roa...

  4. Access America for Students. Strategic Plan.

    ERIC Educational Resources Information Center

    National Partnership for Reinventing Government, Washington, DC.

    This report provides an overview of a federal initiative, entitled Access America for Students, which is designed to re-engineer the way training and educational services are delivered to students. Part of the National Partnership for Reinventing Government, the initiative's major objectives are to implement privacy and security processes for…

  5. Fiber-reinforced ceramic composites for Earth-to-orbit rocket engine turbines

    NASA Technical Reports Server (NTRS)

    Brockmeyer, Jerry W.; Schnittgrund, Gary D.

    1990-01-01

    Fiber reinforced ceramic matrix composites (FRCMC) are emerging materials systems that offer potential for use in liquid rocket engines. Advantages of these materials in rocket engine turbomachinery include performance gain due to higher turbine inlet temperature, reduced launch costs, reduced maintenance with associated cost benefits, and reduced weight. This program was initiated to assess the state of FRCMC development and to propose a plan for their implementation into liquid rocket engine turbomachinery. A complete range of FRCMC materials was investigated relative to their development status and feasibility for use in the hot gas path of earth-to-orbit rocket engine turbomachinery. Of the candidate systems, carbon fiber-reinforced silicon carbide (C/SiC) offers the greatest near-term potential. Critical hot gas path components were identified, and the first stage inlet nozzle and turbine rotor of the fuel turbopump for the liquid oxygen/hydrogen Space Transportation Main Engine (STME) were selected for conceptual design and analysis. The critical issues associated with the use of FRCMC were identified. Turbine blades were designed, analyzed and fabricated. The Technology Development Plan, completed as Task 5 of this program, provides a course of action for resolution of these issues.

  6. NASA Engineering and Safety Center (NESC) Enhanced Melamine (ML) Foam Acoustic Test (NEMFAT)

    NASA Technical Reports Server (NTRS)

    McNelis, Anne M.; Hughes, William O.; McNelis, Mark E.

    2014-01-01

    The NASA Engineering and Safety Center (NESC) funded a proposal to achieve initial basic acoustic characterization of ML (melamine) foam, which could serve as a starting point for a future, more comprehensive acoustic test program for ML foam. A project plan was developed and implemented to obtain acoustic test data for both normal and enhanced ML foam. This project became known as the NESC Enhanced Melamine Foam Acoustic Test (NEMFAT). This document contains the outcome of the NEMFAT project.

  7. Qualitative and quantitative reasoning about thermodynamics

    NASA Technical Reports Server (NTRS)

    Skorstad, Gordon; Forbus, Ken

    1989-01-01

    One goal of qualitative physics is to capture the tacit knowledge of engineers and scientists. It is shown how Qualitative Process theory can be used to express concepts of engineering thermodynamics. In particular, it is shown how to integrate qualitative and quantitative knowledge to solve textbook problems involving thermodynamic cycles, such as gas turbine plants and steam power plants. These ideas were implemented in a program called SCHISM. Its analysis of a sample textbook problem is described and plans for future work are discussed.

  8. Proceedings from the U.S. Army Corps of Engineers (USACE) and the National Oceanic and Atmospheric Administration (NOAA) Engineering With Nature Workshop

    DTIC Science & Technology

    2017-03-01

    opportunities emerged. It will be essential to capture and share lessons learned as the two organizations plan and implement selected EWN projects...their top five or six opportunities and subsequently selected the two highest priorities. Each of the three breakout groups then worked together to...will ensure agency buy-in, establish local reference sites, and promote EWN principles. Site selection will include an iterative process that factors

  9. Implementation of an Open-Loop Rule-Based Control Strategy for a Hybrid-Electric Propulsion System On a Small RPA

    DTIC Science & Technology

    2011-03-01

    input spindle from the engine to over tighten and apply an even greater amount of resistance to the engine shaft . Not only was this dangerous to...Mengistu, Todd Rotramel, and Matt Rippl, all of whom worked together with me to design and build the test rig for our dynamometer setup. Countless...hours were spent together planning and executing the design and building the stand itself. The AFIT machine shop crew and ENY lab techs also

  10. Acoustics and Thrust of Separate Flow Exhaust Nozzles With Mixing Devices Investigated for High Bypass Ratio Engines

    NASA Technical Reports Server (NTRS)

    Saiyed, Naseem H.

    2000-01-01

    Typical installed separate-flow exhaust nozzle system. The jet noise from modern turbofan engines is a major contributor to the overall noise from commercial aircraft. Many of these engines use separate nozzles for exhausting core and fan streams. As a part of NASA s Advanced Subsonic Technology (AST) program, the NASA Glenn Research Center at Lewis Field led an experimental investigation using model-scale nozzles in Glenn s Aero-Acoustic Propulsion Laboratory. The goal of the investigation was to develop technology for reducing the jet noise by 3 EPNdB. Teams of engineers from Glenn, the NASA Langley Research Center, Pratt & Whitney, United Technologies Research Corporation, the Boeing Company, GE Aircraft Engines, Allison Engine Company, and Aero Systems Engineering contributed to the planning and implementation of the test.

  11. Engine Yaw Augmentation for Hybrid-Wing-Body Aircraft via Optimal Control Allocation Techniques

    NASA Technical Reports Server (NTRS)

    Taylor, Brian R.; Yoo, Seung Yeun

    2011-01-01

    Asymmetric engine thrust was implemented in a hybrid-wing-body non-linear simulation to reduce the amount of aerodynamic surface deflection required for yaw stability and control. Hybrid-wing-body aircraft are especially susceptible to yaw surface deflection due to their decreased bare airframe yaw stability resulting from the lack of a large vertical tail aft of the center of gravity. Reduced surface deflection, especially for trim during cruise flight, could reduce the fuel consumption of future aircraft. Designed as an add-on, optimal control allocation techniques were used to create a control law that tracks total thrust and yaw moment commands with an emphasis on not degrading the baseline system. Implementation of engine yaw augmentation is shown and feasibility is demonstrated in simulation with a potential drag reduction of 2 to 4 percent. Future flight tests are planned to demonstrate feasibility in a flight environment.

  12. Software engineering for ESO's VLT project

    NASA Astrophysics Data System (ADS)

    Filippi, G.

    1994-12-01

    This paper reports on the experience at the European Southern Observatory on the application of software engineering techniques to a 200 man-year control software project for the Very Large Telescope (VLT). This shall provide astronomers, before the end of the century, with one of the most powerful telescopes in the world. From the definition of the general model, described in the software management plan, specific activities have been and will be defined: standards for documents and for code development, design approach using a CASE tool, the process of reviewing both documentation and code, quality assurance, test strategy, etc. The initial choices, the current implementation and the future planned activities are presented and, where feedback is already available, pros and cons are discussed.

  13. Optimizing spacecraft design - optimization engine development : progress and plans

    NASA Technical Reports Server (NTRS)

    Cornford, Steven L.; Feather, Martin S.; Dunphy, Julia R; Salcedo, Jose; Menzies, Tim

    2003-01-01

    At JPL and NASA, a process has been developed to perform life cycle risk management. This process requires users to identify: goals and objectives to be achieved (and their relative priorities), the various risks to achieving those goals and objectives, and options for risk mitigation (prevention, detection ahead of time, and alleviation). Risks are broadly defined to include the risk of failing to design a system with adequate performance, compatibility and robustness in addition to more traditional implementation and operational risks. The options for mitigating these different kinds of risks can include architectural and design choices, technology plans and technology back-up options, test-bed and simulation options, engineering models and hardware/software development techniques and other more traditional risk reduction techniques.

  14. Predicting on-site environmental impacts of municipal engineering works

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gangolells, Marta, E-mail: marta.gangolells@upc.edu; Casals, Miquel, E-mail: miquel.casals@upc.edu; Forcada, Núria, E-mail: nuria.forcada@upc.edu

    2014-01-15

    The research findings fill a gap in the body of knowledge by presenting an effective way to evaluate the significance of on-site environmental impacts of municipal engineering works prior to the construction stage. First, 42 on-site environmental impacts of municipal engineering works were identified by means of a process-oriented approach. Then, 46 indicators and their corresponding significance limits were determined on the basis of a statistical analysis of 25 new-build and remodelling municipal engineering projects. In order to ensure the objectivity of the assessment process, direct and indirect indicators were always based on quantitative data from the municipal engineering projectmore » documents. Finally, two case studies were analysed and found to illustrate the practical use of the proposed model. The model highlights the significant environmental impacts of a particular municipal engineering project prior to the construction stage. Consequently, preventive actions can be planned and implemented during on-site activities. The results of the model also allow a comparison of proposed municipal engineering projects and alternatives with respect to the overall on-site environmental impact and the absolute importance of a particular environmental aspect. These findings are useful within the framework of the environmental impact assessment process, as they help to improve the identification and evaluation of on-site environmental aspects of municipal engineering works. The findings may also be of use to construction companies that are willing to implement an environmental management system or simply wish to improve on-site environmental performance in municipal engineering projects. -- Highlights: • We present a model to predict the environmental impacts of municipal engineering works. • It highlights significant on-site environmental impacts prior to the construction stage. • Findings are useful within the environmental impact assessment process. • They also help contractors to implement environmental management systems.« less

  15. Marshall Space Flight Center Propulsion Systems Department (PSD) KM Initiative

    NASA Technical Reports Server (NTRS)

    Caraccioli, Paul; Varnadoe, Tom; McCarter, Mike

    2006-01-01

    NASA Marshall Space Flight Center s Propulsion Systems Department (PSD) is four months into a fifteen month Knowledge Management (KM) initiative to support enhanced engineering decision making and analyses, faster resolution of anomalies (near-term) and effective, efficient knowledge infused engineering processes, reduced knowledge attrition, and reduced anomaly occurrences (long-term). The near-term objective of this initiative is developing a KM Pilot project, within the context of a 3-5 year KM strategy, to introduce and evaluate the use of KM within PSD. An internal NASA/MSFC PSD KM team was established early in project formulation to maintain a practitioner, user-centric focus throughout the conceptual development, planning and deployment of KM technologies and capabilities with in the PSD. The PSD internal team is supported by the University of Alabama's Aging Infrastructure Systems Center Of Excellence (AISCE), Intergraph Corporation, and The Knowledge Institute. The principle product of the initial four month effort has been strategic planning of PSD KM implementation by first determining the "as is" state of KM capabilities and developing, planning and documenting the roadmap to achieve the desired "to be" state. Activities undertaken to support the planning phase have included data gathering; cultural surveys, group work-sessions, interviews, documentation review, and independent research. Assessments and analyses have been performed including industry benchmarking, related local and Agency initiatives, specific tools and techniques used and strategies for leveraging existing resources, people and technology to achieve common KM goals. Key findings captured in the PSD KM Strategic Plan include the system vision, purpose, stakeholders, prioritized strategic objectives mapped to the top ten practitioner needs and analysis of current resource usage. Opportunities identified from research, analyses, cultural/KM surveys and practitioner interviews include: executive and senior management sponsorship, KM awareness, promotion and training, cultural change management, process improvement, leveraging existing resources and new innovative technologies to align with other NASA KM initiatives (convergence: the big picture). To enable results based incremental implementation and future growth of the KM initiative, key performance measures have been identified including stakeholder value, system utility, learning and growth (knowledge capture, sharing, reduced anomaly recurrence), cultural change, process improvement and return-on-investment. The next steps for the initial implementation spiral (focused on SSME Turbomachinery) have been identified, largely based on the organization and compilation of summary level engineering process models, data capture matrices, functional models and conceptual-level systems architecture. Key elements include detailed KM requirements definition, KM technology architecture assessment, evaluation and selection, deployable KM Pilot design, development, implementation and evaluation, and justifying full implementation (estimated Return-on-Investment). Features identified for the notional system architecture include the knowledge presentation layer (and its components), knowledge network layer (and its components), knowledge storage layer (and its components), User Interface and capabilities. This paper provides a snapshot of the progress to date, the near term planning for deploying the KM pilot project and a forward look at results based growth of KM capabilities with-in the MSFC PSD.

  16. Marshall Space Flight Center Propulsion Systems Department (PSD) Knowledge Management (KM) Initiative

    NASA Technical Reports Server (NTRS)

    Caraccioli, Paul; Varnedoe, Tom; Smith, Randy; McCarter, Mike; Wilson, Barry; Porter, Richard

    2006-01-01

    NASA Marshall Space Flight Center's Propulsion Systems Department (PSD) is four months into a fifteen month Knowledge Management (KM) initiative to support enhanced engineering decision making and analyses, faster resolution of anomalies (near-term) and effective, efficient knowledge infused engineering processes, reduced knowledge attrition, and reduced anomaly occurrences (long-term). The near-term objective of this initiative is developing a KM Pilot project, within the context of a 3-5 year KM strategy, to introduce and evaluate the use of KM within PSD. An internal NASA/MSFC PSD KM team was established early in project formulation to maintain a practitioner, user-centric focus throughout the conceptual development, planning and deployment of KM technologies and capabilities within the PSD. The PSD internal team is supported by the University of Alabama's Aging Infrastructure Systems Center of Excellence (AISCE), lntergraph Corporation, and The Knowledge Institute. The principle product of the initial four month effort has been strategic planning of PSD KNI implementation by first determining the "as is" state of KM capabilities and developing, planning and documenting the roadmap to achieve the desired "to be" state. Activities undertaken to suppoth e planning phase have included data gathering; cultural surveys, group work-sessions, interviews, documentation review, and independent research. Assessments and analyses have beon pedormed including industry benchmarking, related local and Agency initiatives, specific tools and techniques used and strategies for leveraging existing resources, people and technology to achieve common KM goals. Key findings captured in the PSD KM Strategic Plan include the system vision, purpose, stakeholders, prioritized strategic objectives mapped to the top ten practitioner needs and analysis of current resource usage. Opportunities identified from research, analyses, cultural1KM surveys and practitioner interviews include: executive and senior management sponsorship, KM awareness, promotion and training, cultural change management, process improvement, leveraging existing resources and new innovative technologies to align with other NASA KM initiatives (convergence: the big picture). To enable results based incremental implementation and future growth of the KM initiative, key performance measures have been identified including stakeholder value, system utility, learning and growth (knowledge capture, sharing, reduced anomaly recurrence), cultural change, process improvement and return-on-investment. The next steps for the initial implementation spiral (focused on SSME Turbomachinery) have been identified, largely based on the organization and compilation of summary level engineering process models, data capture matrices, functional models and conceptual-level svstems architecture. Key elements include detailed KM requirements definition, KM technology architecture assessment, - evaluation and selection, deployable KM Pilot design, development, implementation and evaluation, and justifying full implementation (estimated Return-on-Investment). Features identified for the notional system architecture include the knowledge presentation layer (and its components), knowledge network layer (and its components), knowledge storage layer (and its components), User Interface and capabilities. This paper provides a snapshot of the progress to date, the near term planning for deploying the KM pilot project and a forward look at results based growth of KM capabilities with-in the MSFC PSD.

  17. NASA's future plans for lunar astronomy and astrophysics

    NASA Technical Reports Server (NTRS)

    Stachnik, Robert V.; Kaplan, Michael S.

    1994-01-01

    An expanding scientific interest in astronomical observations from the Moon has led the National Aeronautics and Space Administration (NASA) to develop a two-part strategy for lunar-astrophysics planning. The strategy emphasizes a systematic review process involving both the external scientific community and internal NASA engineering teams, coupled with the rigorous exclusion of projects inappropriate to lunar emplacement. Five major candidate lunar-astronomy projects are described, together with a modest derivative of one of them that could be implemented early in the establishment of a lunar base.

  18. Engineering-Geological Data Model - The First Step to Build National Polish Standard for Multilevel Information Management

    NASA Astrophysics Data System (ADS)

    Ryżyński, Grzegorz; Nałęcz, Tomasz

    2016-10-01

    The efficient geological data management in Poland is necessary to support multilevel decision processes for government and local authorities in case of spatial planning, mineral resources and groundwater supply and the rational use of subsurface. Vast amount of geological information gathered in the digital archives and databases of Polish Geological Survey (PGS) is a basic resource for multi-scale national subsurface management. Data integration is the key factor to allow development of GIS and web tools for decision makers, however the main barrier for efficient geological information management is the heterogeneity of data in the resources of the Polish Geological Survey. Engineering-geological database is the first PGS thematic domain applied in the whole data integration plan. The solutions developed within this area will facilitate creation of procedures and standards for multilevel data management in PGS. Twenty years of experience in delivering digital engineering-geological mapping in 1:10 000 scale and archival geotechnical reports acquisition and digitisation allowed gathering of more than 300 thousands engineering-geological boreholes database as well as set of 10 thematic spatial layers (including foundation conditions map, depth to the first groundwater level, bedrock level, geohazards). Historically, the desktop approach was the source form of the geological-engineering data storage, resulting in multiple non-correlated interbase datasets. The need for creation of domain data model emerged and an object-oriented modelling (UML) scheme has been developed. The aim of the aforementioned development was to merge all datasets in one centralised Oracle server and prepare the unified spatial data structure for efficient web presentation and applications development. The presented approach will be the milestone toward creation of the Polish national standard for engineering-geological information management. The paper presents the approach and methodology of data unification, thematic vocabularies harmonisation, assumptions and results of data modelling as well as process of the integration of domain model with enterprise architecture implemented in PGS. Currently, there is no geological data standard in Poland. Lack of guidelines for borehole and spatial data management results in an increasing data dispersion as well as in growing barrier for multilevel data management and implementation of efficient decision support tools. Building the national geological data standard makes geotechnical information accessible to multiple institutions, universities, administration and research organisations and gather their data in the same, unified digital form according to the presented data model. Such approach is compliant with current digital trends and the idea of Spatial Data Infrastructure. Efficient geological data management is essential to support the sustainable development and the economic growth, as they allow implementation of geological information to assist the idea of Smart Cites, deliver information for Building Information Management (BIM) and support modern spatial planning. The engineering-geological domain data model presented in the paper is a scalable solution. Future implementation of developed procedures on other domains of PGS geological data is possible.

  19. Collaborative environments for capability-based planning

    NASA Astrophysics Data System (ADS)

    McQuay, William K.

    2005-05-01

    Distributed collaboration is an emerging technology for the 21st century that will significantly change how business is conducted in the defense and commercial sectors. Collaboration involves two or more geographically dispersed entities working together to create a "product" by sharing and exchanging data, information, and knowledge. A product is defined broadly to include, for example, writing a report, creating software, designing hardware, or implementing robust systems engineering and capability planning processes in an organization. Collaborative environments provide the framework and integrate models, simulations, domain specific tools, and virtual test beds to facilitate collaboration between the multiple disciplines needed in the enterprise. The Air Force Research Laboratory (AFRL) is conducting a leading edge program in developing distributed collaborative technologies targeted to the Air Force's implementation of systems engineering for a simulation-aided acquisition and capability-based planning. The research is focusing on the open systems agent-based framework, product and process modeling, structural architecture, and the integration technologies - the glue to integrate the software components. In past four years, two live assessment events have been conducted to demonstrate the technology in support of research for the Air Force Agile Acquisition initiatives. The AFRL Collaborative Environment concept will foster a major cultural change in how the acquisition, training, and operational communities conduct business.

  20. Technology Integration in Science Classrooms: Framework, Principles, and Examples

    ERIC Educational Resources Information Center

    Kim, Minchi C.; Freemyer, Sarah

    2011-01-01

    A great number of technologies and tools have been developed to support science learning and teaching. However, science teachers and researchers point out numerous challenges to implementing such tools in science classrooms. For instance, guidelines, lesson plans, Web links, and tools teachers can easily find through Web-based search engines often…

  1. 77 FR 39177 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Regional Haze

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-02

    ... of SO 2 from each of 167 stacks in 19 states, 28 percent control of non-EGU SO 2 emissions, and... INFORMATION CONTACT: Charles Hatten, Environmental Engineer, Control Strategies Section, Air Programs Branch... Directors Consortium (LADCO), Ohio identified one non-electric generating unit (non-EGU) source, P.H...

  2. Extending the TSP to Systems Engineering: Early Results from Team Process Integration

    DTIC Science & Technology

    2010-08-01

    within ±10 percent of what was planned, and there were no high-priority problem reports coming out of test. Employee Work / Life Balance TPI helped improve...employee work / life balance . In order to get their job done before implementing TPI, employees rou- tinely worked overtime. With TPI (and in COMING

  3. 77 FR 45530 - Approval and Promulgation of Implementation Plans; New Mexico; Albuquerque/Bernalillo County...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-01

    ... gasoline/electric hybrid vehicles; changes test frequency for some model year vehicles; allows motorists... hybrid vehicle gasoline engines, changing the test frequency for some model year vehicles, revising an... possible. Including the growing number of these hybrid vehicles in the I/M program will result in greater...

  4. 77 FR 18987 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Nonattainment New...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-29

    ... sulfate (SO 4 ); nitrate (NO 3 ); ammonium; elemental carbon; a great variety of organic compounds; and inorganic material (including metals, dust, sea salt, and other trace elements) generally referred to as... the air as a solid or liquid particle (e.g., elemental carbon from diesel engines or fire activities...

  5. Planning and Implementing a Comprehensive Student-Centered Research Program for First-Year STEM Undergraduates

    ERIC Educational Resources Information Center

    Schneider, Kimberly R.; Bickel, Amelia; Morrison-Shetlar, Alison

    2015-01-01

    Retaining college-level science, technology, engineering, and mathematics (STEM) students remains a priority in higher education. A variety of methods have been shown to increase retention, including mentorship, tutoring, course enhancements, community building, and engagement in high-impact practices such as undergraduate research. In 2011, an…

  6. Implementing a High School Level Geospatial Technologies and Spatial Thinking Course

    ERIC Educational Resources Information Center

    Nielsen, Curtis P.; Oberle, Alex; Sugumaran, Ramanathan

    2011-01-01

    Understanding geospatial technologies (GSTs) and spatial thinking is increasingly vital to contemporary life including common activities and hobbies; learning in science, mathematics, and social science; and employment within fields as diverse as engineering, health, business, and planning. As such, there is a need for a stand-alone K-12…

  7. T55 power turbine rotor multiplane-multispeed balancing study

    NASA Technical Reports Server (NTRS)

    Martin, M. R.

    1982-01-01

    A rotordynamic analysis of the T55-L-11C engine was used to evaluate the balancing needs of the power turbine and to optimize the balancing procedure. As a result, recommendations were made for implementation of a multiplane-multispeed balancing plan. Precision collars for the attachment of trial weights to a slender rotor were designed enabling demonstration balancing on production hardware. The quality of the balance was then evaluated by installing a high speed balanced power turbine in an engine and running in a test cell at the Corpus Christi Army depot. The engine used had been tested prior to the turbine changeout and showed acceptable overall vibration levels for the engine were significantly reduced, demonstrating the ability of multiplane-multispeed balancing to control engine vibration.

  8. Systems engineering real estate development projects

    NASA Astrophysics Data System (ADS)

    Gusakova, Elena; Titarenko, Boris; Stepanov, Vitaliy

    2017-10-01

    In recent years, real estate development has accumulated a wealth of experience in implementing major projects, which requires comprehension and systematization. The scientific instrument of system engineering is studied in the article and is substantively interpreted with reference to real estate development projects. The most perspective approaches and models are substantiated, allowing strategically to plan the life cycle of the project as a whole, and also to solve the engineering butt problems of the project. The relevance of further scientific studies of regularities and specifics of the life cycle of real estate development projects conducted at the Moscow State University of Economics and Management at the ISTA department is shown.

  9. Selecting and implementing scientific objectives. [for Voyager 1 and 2 planetary encounters

    NASA Technical Reports Server (NTRS)

    Miner, E. D.; Stembridge, C. H.; Doms, P. E.

    1985-01-01

    The procedures used to select and implement scientific objectives for the Voyager 1 and 2 planetary encounters are described. Attention is given to the scientific tradeoffs and engineering considerations must be addressed at various stages in the mission planning process, including: the limitations of ground and spacecraft communications systems, ageing of instruments in flight, and instrument calibration over long distances. The contribution of planetary science workshops to the definition of scientific objectives for deep space missions is emphasized.

  10. Fiberoptic characteristics for extreme operating environments

    NASA Technical Reports Server (NTRS)

    Delcher, R. C.

    1992-01-01

    Fiberoptics could offer several major benefits for cryogenic liquid-fueled rocket engines, including lightning immunity, weight reduction, and the possibility of implementing a number of new measurements for engine condition monitoring. The technical feasibility of using fiberoptics in the severe environments posed by cryogenic liquid-fueled rocket engines was determined. The issues of importance and subsequent requirements for this use of fiberoptics were compiled. These included temperature ranges, moisture embrittlement succeptability, and the ability to withstand extreme shock and vibration levels. Different types of optical fibers were evaluated and several types of optical fibers' ability to withstand use in cryogenic liquid-fueled rocket engines was demonstrated through environmental testing of samples. This testing included: cold-bend testing, moisture embrittlement testing, temperature cycling, temperature extremes testing, vibration testing, and shock testing. Three of five fiber samples withstood the tests to a level proving feasibility, and two of these remained intact in all six of the tests. A fiberoptic bundle was also tested, and completed testing without breakage. Preliminary cabling and harnessing for fiber protection was also demonstrated. According to cable manufacturers, the successful -300 F cold bend, vibration, and shock tests are the first instance of any major fiberoptic cable testing below roughly -55 F. This program has demonstrated the basic technical feasibility of implementing optical fibers on cryogenic liquid-fueled rocket engines, and a development plan is included highlighting requirements and issues for such an implementation.

  11. Status of the Combined Cycle Engine Rig

    NASA Technical Reports Server (NTRS)

    Saunders, Dave; Slater, John; Dippold, Vance

    2009-01-01

    Status for the past year is provided of the turbine-based Combined-Cycle Engine (CCE) Rig for the hypersonic project. As part of the first stage propulsion of a two-stage-to-orbit vehicle concept, this engine rig is designed with a common inlet that supplies flow to a turbine engine and a dual-mode ramjet / scramjet engine in an over/under configuration. At Mach 4 the inlet has variable geometry to switch the airflow from the turbine to the ramjet / scramjet engine. This process is known as inlet mode-transition. In addition to investigating inlet aspects of mode transition, the rig will allow testing of turbine and scramjet systems later in the test series. Fully closing the splitter cowl "cocoons" the turbine engine and increases airflow to the scramjet duct. The CCE Rig will be a testbed to investigate integrated propulsion system and controls technology objectives. Four phases of testing are planned to 1) characterize the dual inlet database, 2) collect inlet dynamics using system identification techniques, 3) implement an inlet control to demonstrate mode-transition scenarios and 4) demonstrate integrated inlet/turbine engine operation through mode-transition. Status of the test planning and preparation activities is summarized with background on the inlet design and small-scale testing, analytical CFD predictions and some details of the large-scale hardware. The final stages of fabrication are underway.

  12. The European water framework directive: water quality classification and implications to engineering planning.

    PubMed

    Achleitner, Stefan; De Toffol, Sara; Engelhard, Carolina; Rauch, Wolfgang

    2005-04-01

    The European Water framework directive (WFD) is probably the most important environmental management directive that has been enacted over the last decade in the European Union. The directive aims at achieving an overall good ecological status in all European water bodies. In this article, we discuss the implementation steps of the WFD and their implications for environmental engineering practice while focusing on rivers as the main receiving waters. Arising challenges for engineers and scientists are seen in the quantitative assessment of water quality, where standardized systems are needed to estimate the biological status. This is equally of concern in engineering planning, where the prediction of ecological impacts is required. Studies dealing with both classification and prediction of the ecological water quality are reviewed. Further, the combined emission-water quality approach is discussed. Common understanding of this combined approach is to apply the most stringent of either water quality or emission standard to a certain case. In contrast, for example, the Austrian water act enables the application of only the water quality based approach--at least on a temporary basis.

  13. Conventional engine technology. Volume 3: Comparisons and future potential

    NASA Technical Reports Server (NTRS)

    Dowdy, M. W.

    1981-01-01

    The status of five conventional automobile engine technologies was assessed and the future potential for increasing fuel economy and reducing exhaust emission was discussed, using the 1980 EPA California emisions standards as a comparative basis. By 1986, the fuel economy of a uniform charge Otto engine with a three-way catalyst is expected to increase 10%, while vehicles with lean burn (fast burn) engines should show a 20% fuel economy increase. Although vehicles with stratified-charge engines and rotary engines are expected to improve, their fuel economy will remain inferior to the other engine types. When adequate NO emissions control methods are implemented to meet the EPA requirements, vehicles with prechamber diesel engines are expected to yield a fuel economy advantage of about 15%. While successful introduction of direct injection diesel engine technology will provide a fuel savings of 30 to 35%, the planned regulation of exhaust particulates could seriously hinder this technology, because it is expected that only the smallest diesel engine vehicles could meet the proposed particulate requirements.

  14. Apollo experience report: Guidance and control systems. Engineering simulation program

    NASA Technical Reports Server (NTRS)

    Gilbert, D. W.

    1973-01-01

    The Apollo Program experience from early 1962 to July 1969 with respect to the engineering-simulation support and the problems encountered is summarized in this report. Engineering simulation in support of the Apollo guidance and control system is discussed in terms of design analysis and verification, certification of hardware in closed-loop operation, verification of hardware/software compatibility, and verification of both software and procedures for each mission. The magnitude, time, and cost of the engineering simulations are described with respect to hardware availability, NASA and contractor facilities (for verification of the command module, the lunar module, and the primary guidance, navigation, and control system), and scheduling and planning considerations. Recommendations are made regarding implementation of similar, large-scale simulations for future programs.

  15. Engineering of mechanical manufacturing from the cradle to cradle

    NASA Astrophysics Data System (ADS)

    Peralta, M. E.; Aguayo, F.; Lama, J. R.

    2012-04-01

    The sustainability of manufacturing processes lies in industrial planning and productive activity. Industrial plants are characterized by the management of resource (inputs and outputs), processing and conversion processes, which usually are organized in a linear system. Good planning will optimize the manufacturing and promoting the quality of the industrial system. Cradle to Cradle is a new paradigm for engineering and sustainable manufacturing that integrates projects (industrial parks, manufacturing plants, systems and products) in a framework consistent with the environment, adapted to the society and technology and economically viable. To carry it out, we implement this paradigm in the MGE2 (Genomic Model of Eco-innovation and Eco-design), as a methodology for designing and developing products and manufacturing systems with an approach from the cradle to cradle.

  16. The influence of interdisciplinary collaboration on decision making: a framework to analyse stakeholder coalitions, evolution and learning in strategic delta planning

    NASA Astrophysics Data System (ADS)

    Vermoolen, Myrthe; Hermans, Leon

    2015-04-01

    The sustained development of urbanizing deltas requires that conflicting interests are reconciled, in an environment characterized by technical complexity and knowledge limitations. However, integrating ideas and establishing cooperation between actors with different backgrounds and roles still proves a challenge. Agreeing on strategic choices is difficult and implementation of agreed plans may lead to unanticipated and unintended outcomes. How can individual disciplinary perspectives come together and establish a broadly-supported and well-informed plan, the implementation of which contributes to sustainable delta development? The growing recognition of this need to bring together different stakeholders and different disciplinary perspectives runs parallel to a paradigm shift from 'hard' hydrological engineering to multi-functional and more 'soft' hydrological engineering in water management. As a result, there is now more attention for interdisciplinary collaboration that not only takes the physical characteristics of water systems into account, but also the interaction between physical and societal components of these systems. Thus, it is important to study interdisciplinary collaboration and how this influences decision-making. Our research looks into this connection, using a case in delta planning in the Netherlands, where there have been several (attempts for) integration of spatial planning and flood risk/ water management, e.g. in the case of the Dutch Delta Programme. This means that spatial designers and their designs play an important role in the strategic delta planning process as well, next to civil engineers, etc. This study explores the roles of stakeholders, experts and policy makers in interdisciplinary decision-making in dynamic delta planning processes, using theories and methods that focus on coalitions, learning and changes over time in policy and planning processes. This requires an expansion of the existing frameworks to study interdisciplinary collaboration. The question here is how to combine policy science frameworks (e.g. the Advocacy Coalition Framework) and social network methods (e.g. Social Network Analysis) with frameworks that allow a connection with the physical delta systems. This will result in a new framework for analysing interdisciplinary stakeholder coalitions, evolution and learning in strategic delta planning. The use of this framework will be illustrated with an example from strategic delta planning in the Dutch Southwest Delta. With this, we want to see how spatial planning and water management disciplines have combined into new policies for delta management in the Netherlands over the past 25 years.

  17. Case study of open-source enterprise resource planning implementation in a small business

    NASA Astrophysics Data System (ADS)

    Olson, David L.; Staley, Jesse

    2012-02-01

    Enterprise resource planning (ERP) systems have been recognised as offering great benefit to some organisations, although they are expensive and problematic to implement. The cost and risk make well-developed proprietorial systems unaffordable to small businesses. Open-source software (OSS) has become a viable means of producing ERP system products. The question this paper addresses is the feasibility of OSS ERP systems for small businesses. A case is reported involving two efforts to implement freely distributed ERP software products in a small US make-to-order engineering firm. The case emphasises the potential of freely distributed ERP systems, as well as some of the hurdles involved in their implementation. The paper briefly reviews highlights of OSS ERP systems, with the primary focus on reporting the case experiences for efforts to implement ERPLite software and xTuple software. While both systems worked from a technical perspective, both failed due to economic factors. While these economic conditions led to imperfect results, the case demonstrates the feasibility of OSS ERP for small businesses. Both experiences are evaluated in terms of risk dimension.

  18. Reuseable Objects Software Environment (ROSE): Introduction to Air Force Software Reuse Workshop

    NASA Technical Reports Server (NTRS)

    Cottrell, William L.

    1994-01-01

    The Reusable Objects Software Environment (ROSE) is a common, consistent, consolidated implementation of software functionality using modern object oriented software engineering including designed-in reuse and adaptable requirements. ROSE is designed to minimize abstraction and reduce complexity. A planning model for the reverse engineering of selected objects through object oriented analysis is depicted. Dynamic and functional modeling are used to develop a system design, the object design, the language, and a database management system. The return on investment for a ROSE pilot program and timelines are charted.

  19. Resource Efficiency in the US Army Corps of Engineers: Examination of Strategies to Reduce Energy Use and Greenhouse Gas Emissions

    DTIC Science & Technology

    2012-09-15

    Control 19 4,321 639 Office 10 4,387 584 Hydropower 5 2,885 504 2.1.2 NTV emissions NTV petroleum consumption information is a combination of ...reductions that will occur because of planned engine efficiency changes in the floating plant . These reductions total 8,956 MTCO2e. In addition, a ...and/or the implementation of a variety of measures such as passive solar energy, planting trees and plants around buildings to achieve desired

  20. Evaluation Program on the Implementation of Industrial Apprenticeship (Prakerin) in Electrical Engineering

    NASA Astrophysics Data System (ADS)

    Maulana, I.; Sumarto; Nurafiati, P.; Puspita, R. H.

    2018-02-01

    This research aims to find out the evaluation program of the Industrial apprenticeship (Prakerin) in electrical engineering. This research includes on four variables of CIPP. (1). Context (a). programme planning (b). design. (2). Input (a). readiness of students (b). performance of vocational education teachers (c). Facilities and infrastructure, (3). process (a). performance students (b). performance mentors, (4). Product (a). readiness of student work. This research is a type of program evaluation research with Stake model approach. Data collection methods used are questionnaires with closed questions and frequently asked questions.

  1. TU-EF-304-03: 4D Monte Carlo Robustness Test for Proton Therapy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Souris, K; Sterpin, E; Lee, J

    Purpose: Breathing motion and approximate dose calculation engines may increase proton range uncertainties. We address these two issues using a comprehensive 4D robustness evaluation tool based on an efficient Monte Carlo (MC) engine, which can simulate breathing with no significant increase in computation time. Methods: To assess the robustness of the treatment plan, multiple scenarios of uncertainties are simulated, taking into account the systematic and random setup errors, range uncertainties, and organ motion. Our fast MC dose engine, called MCsquare, implements optimized models on a massively-parallel computation architecture and allows us to accurately simulate a scenario in less than onemore » minute. The deviations of the uncertainty scenarios are then reported on a DVH-band and compared to the nominal plan.The robustness evaluation tool is illustrated in a lung case by comparing three 60Gy treatment plans. First, a plan is optimized on a PTV obtained by extending the CTV with an 8mm margin, in order to take into account systematic geometrical uncertainties, like in our current practice in radiotherapy. No specific strategy is employed to correct for tumor and organ motions. The second plan involves a PTV generated from the ITV, which encompasses the tumor volume in all breathing phases. The last plan results from robust optimization performed on the ITV, with robustness parameters of 3% for tissue density and 8 mm for positioning errors. Results: The robustness test revealed that the first two plans could not properly cover the target in the presence of uncertainties. CTV-coverage (D95) in the three plans ranged respectively between 39.4–55.5Gy, 50.2–57.5Gy, and 55.1–58.6Gy. Conclusion: A realistic robustness verification tool based on a fast MC dose engine has been developed. This test is essential to assess the quality of proton therapy plan and very useful to study various planning strategies for mobile tumors. This work is partly funded by IBA (Louvain-la-Neuve, Belgium)« less

  2. 76 FR 80253 - Approval and Promulgation of Implementation Plans and Designation of Areas for Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-23

    ... not formed in a secondary manner through chemical reactions or other processes in the atmosphere. \\2\\ NO X and SO 2 are precursors for fine particulates through chemical reactions and other related... Department of Energy, as well as the Agency's engineering assessment to determine the effects of exhaust and...

  3. Low-Cost In-Fill Installation for High-Energy-Saving, Dynamic Windows

    DTIC Science & Technology

    2017-07-01

    greenhouse gas, HVAC, low emissivity, military construction, photovoltaic, physical vapor deposition, solar heat gain coefficient... Physical vapor deposition ROICC Resident Officer In Charge of Construction SHGC Solar heat gain coefficient S/RM Sustainment, Restoration, and...PERMITS AND REGULATIONS Regulations - The demonstration project planning and implementation followed US Army Corps of Engineers Safety and Health

  4. Applying the Art of Systems and Organizational Architecting in Order to Implement Operational Design into Marine Corps Planning Doctrine

    DTIC Science & Technology

    2011-09-01

    worldview of all stakeholders possibly involved in the operational system at the present time and in the future ( Checkland & Poulter, 2006). In...Blanchard, B.S., & Fabrycky, W.J. (1998). Systems engineering and analysis, 4th ed. Upper Saddle River, NJ: Prentice Hall. Checkland , P. & Poulter, J

  5. 78 FR 7705 - Approval and Promulgation of Implementation Plans and Designation of Areas for Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-04

    ... 1997 8-hour ozone standard in the Area. EPA is also proposing to approve the motor vehicle emission... internal combustion engines. \\4\\ On May 12, 2005, EPA published the Clean Air Interstate Rule (CAIR), which... requiring inspection and maintenance of vehicles (I/M). Section 182(c)(3)requires enhanced vehicle...

  6. Atmosphere, Magnetosphere and Plasmas in Space (AMPS). Spacelab payload definition study. Volume 5: Technical summary

    NASA Technical Reports Server (NTRS)

    1976-01-01

    Engineering and operational facets associated with the implementation of the first two AMPS flights are covered. The payload is described including all systems and subsystems and the mission planning and flight operations are described too. Payload integration, ground operations, and logistics are included along with key supporting analyses and mass properties.

  7. Summary of Results from Space Shuttle Main Engine Off-Nominal Testing

    NASA Technical Reports Server (NTRS)

    Horton, James F.; Megivern, Jeffrey M.; McNutt, Leslie M.

    2011-01-01

    This paper is a summary of Space Shuttle Main Engine (SSME) off-nominal testing that occurred during 2008 and 2009. During the last two years of planned SSME testing at Stennis Space Center, Pratt & Whitney Rocketdyne worked with their NASA MSFC customer to systematically identify, develop, assess, and implement challenging test objectives in order to expand the knowledge of one of the world s most reliable and highly tested large rocket engine. The objectives successfully investigated three main areas of interest expanding engine performance margins, demonstrating system operational capabilities, and establishing ground work for new rocket engine technology. The testing gave the Space Shuttle Program new options to safely fly out the flight manifest and provided Pratt & Whitney Rocketdyne and NASA new insight into the operational capabilities of the SSME, capabilities which can be used in assessing potential future applications of the RS-25 engine.

  8. Coordinating robot motion, sensing, and control in plans. LDRD project final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Xavier, P.G.; Brown, R.G.; Watterberg, P.A.

    1997-08-01

    The goal of this project was to develop a framework for robotic planning and execution that provides a continuum of adaptability with respect to model incompleteness, model error, and sensing error. For example, dividing robot motion into gross-motion planning, fine-motion planning, and sensor-augmented control had yielded productive research and solutions to individual problems. Unfortunately, these techniques could only be combined by hand with ad hoc methods and were restricted to systems where all kinematics are completely modeled in planning. The original intent was to develop methods for understanding and autonomously synthesizing plans that coordinate motion, sensing, and control. The projectmore » considered this problem from several perspectives. Results included (1) theoretical methods to combine and extend gross-motion and fine-motion planning; (2) preliminary work in flexible-object manipulation and an implementable algorithm for planning shortest paths through obstacles for the free-end of an anchored cable; (3) development and implementation of a fast swept-body distance algorithm; and (4) integration of Sandia`s C-Space Toolkit geometry engine and SANDROS motion planer and improvements, which yielded a system practical for everyday motion planning, with path-segment planning at interactive speeds. Results (3) and (4) have either led to follow-on work or are being used in current projects, and they believe that (2) will eventually be also.« less

  9. Practical Education Support to Foster Engineers at Manufacturing and Engineering Design Center in Muroran Institute of Technology

    NASA Astrophysics Data System (ADS)

    Kazama, Toshiharu; Hanajima, Naohiko; Shimizu, Kazumichi; Satoh, Kohki

    To foster engineers with creative power, Muroran Institute of Technology established Manufacturing and Engineering Design Center (MEDeC) that concentrates on Monozukuri. MEDeC consists of three project groups : i) Education Support Group provides educational support for practical training classes on and off campus and PDCA (plan-do-check-action) -conscious engineering design education related to Monozukuri ; ii) Fundamental Manufacturing Research Group carries out nurture research into fundamental and innovative technology of machining and manufacturing, and iii) Regional Cooperation Group coordinates the activities in cooperation with bureau, schools and industries in and around Muroran City. MEDeC has a fully integrated collection of machine tools and hand tools for manufacturing, an atelier, a tatara workplace, implements for measurement and related equipment designed for practically teaching state-of-the-practice manufacturing methods.

  10. ERISTAR: Earth Resources Information Storage, Transformation, Analysis, and Retrieval

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The National Aeronautics and Space Administration (NASA) and the American Society for Engineering Education (ASEE) have sponsored faculty fellowship programs in systems engineering design for the past several years. During the summer of 1972 four such programs were conducted by NASA, with Auburn University cooperating with Marshall Space Flight Center (MSFC). The subject for the Auburn-MSFC design group was ERISTAR, an acronym for Earth Resources Information Storage, Transformation, Analysis and Retrieval, which represents an earth resources information management network of state information centers administered by the respective states and linked to federally administered regional centers and a national center. The considerations for serving the users and the considerations that must be given to processing data from a variety of sources are described. The combination of these elements into a national network is discussed and an implementation plan is proposed for a prototype state information center. The compatibility of the proposed plan with the Department of Interior plan, RALI, is indicated.

  11. Cottonwood Management Plan / Draft Programmatic Environmental Assessment. Proposed Implementation of a Cottonwood Management Plan Along Six Priority Segments of the Missouri River

    DTIC Science & Technology

    2010-02-01

    floodplain ridges, levees, and road embankments), concave-up areas ( depressions , such as river channels, floodplain swales, and drainage ditches), and areas... depressions in dry, open, sandy areas with less than 30 percent vegetative cover and plant heights less than 1 foot (from USFWS 1990b; USFWS, 1990c as...U.S. Department of the Interior, NPS and the U.S. Army Corps of Engineers. National Park Service (NPS). 2007. First Annual Centennial Strategy for

  12. Design and implementation of a project-based active/cooperative engineering design course for freshmen

    NASA Astrophysics Data System (ADS)

    Abdulaal, R. M.; Al-Bahi, A. M.; Soliman, A. Y.; Iskanderani, F. I.

    2011-08-01

    A project-based active/cooperative design course is planned, implemented, assessed and evaluated to achieve several desired engineering outcomes. The course allows freshman-level students to gain professional hands-on engineering design experience through an opportunity to practise teamwork, quality principles, communication skills, life-long learning, realistic constraints and awareness of current domestic and global challenges. Throughout successive design reports and in-class assignments, the students are required by the end of the semester to communicate, clearly and concisely, the details of their design both orally and in writing through a functional artefact/prototype, a design notebook, an A0 project poster and a final oral presentation. In addition to these direct assessment tools, several indirect measures are used to ensure triangulation. Assignments are based on customer expectations using a detailed checklist. This paper shows the direct and indirect assessment tools that indicated a high level of achievement of course learning outcomes and a high level of student satisfaction.

  13. NASA Supportability Engineering Implementation Utilizing DoD Practices and Processes

    NASA Technical Reports Server (NTRS)

    Smith, David A.; Smith, John V.

    2010-01-01

    The Ares I design and development program made the determination early in the System Design Review Phase to utilize DoD ILS and LSA approach for supportability engineering as an integral part of the system engineering process. This paper is to provide a review of the overall approach to design Ares-I with an emphasis on a more affordable, supportable, and sustainable launch vehicle. Discussions will include the requirements development, design influence, support concept alternatives, ILS and LSA planning, Logistics support analyses/trades performed, LSA tailoring for NASA Ares Program, support system infrastructure identification, ILS Design Review documentation, Working Group coordination, and overall ILS implementation. At the outset, the Ares I Project initiated the development of the Integrated Logistics Support Plan (ILSP) and a Logistics Support Analysis process to provide a path forward for the management of the Ares-I ILS program and supportability analysis activities. The ILSP provide the initial planning and coordination between the Ares-I Project Elements and Ground Operation Project. The LSA process provided a system engineering approach in the development of the Ares-I supportability requirements; influence the design for supportability and development of alternative support concepts that satisfies the program operability requirements. The LSA planning and analysis results are documented in the Logistics Support Analysis Report. This document was required during the Ares-I System Design Review (SDR) and Preliminary Design Review (PDR) review cycles. To help coordinate the LSA process across the Ares-I project and between programs, the LSA Report is updated and released quarterly. A System Requirement Analysis was performed to determine the supportability requirements and technical performance measurements (TPMs). Two working groups were established to provide support in the management and implement the Ares-I ILS program, the Integrated Logistics Support Working Group (ILSWG) and the Logistics Support Analysis Record Working Group (LSARWG). The Ares I ILSWG is established to assess the requirements and conduct, evaluate analyses and trade studies associated with acquisition logistic and supportability processes and to resolve Ares I integrated logistics and supportability issues. It established a strategic collaborative alliance for coordination of Logistics Support Analysis activates in support of the integrated Ares I vehicle design and development of logistics support infrastructure. A Joint Ares I - Orion LSAR Working Group was established to: 1) Guide the development of Ares-I and Orion LSAR data and serve as a model for future Constellation programs, 2) Develop rules and assumptions that will apply across the Constellation program with regards to the program's LSAR development, and 3) Maintain the Constellation LSAR Style Guide.

  14. Matrix evaluation of science objectives

    NASA Technical Reports Server (NTRS)

    Wessen, Randii R.

    1994-01-01

    The most fundamental objective of all robotic planetary spacecraft is to return science data. To accomplish this, a spacecraft is fabricated and built, software is planned and coded, and a ground system is designed and implemented. However, the quantitative analysis required to determine how the collection of science data drives ground system capabilities has received very little attention. This paper defines a process by which science objectives can be quantitatively evaluated. By applying it to the Cassini Mission to Saturn, this paper further illustrates the power of this technique. The results show which science objectives drive specific ground system capabilities. In addition, this process can assist system engineers and scientists in the selection of the science payload during pre-project mission planning; ground system designers during ground system development and implementation; and operations personnel during mission operations.

  15. Beyond Blackboards: Engaging Underserved Middle School Students in Engineering.

    PubMed

    Blanchard, Sarah; Judy, Justina; Muller, Chandra; Crawford, Richard H; Petrosino, Anthony J; White, Christina K; Lin, Fu-An; Wood, Kristin L

    Beyond Blackboards is an inquiry-centered, after-school program designed to enhance middle school students' engagement with engineering through design-based experiences focused on the 21 st Century Engineering Challenges. Set within a predominantly low-income, majority-minority community, our study aims to investigate the impact of Beyond Blackboards on students' interest in and understanding of engineering, as well as their ability to align their educational and career plans. We compare participants' and nonparticipants' questionnaire responses before the implementation and at the end of the program's first academic year. Statistically significant findings indicate a school-wide increase in students' interest in engineering careers, supporting a shift in school culture. However, only program participants showed increased enjoyment of design-based strategies, understanding of what engineers do, and awareness of the steps for preparing for an engineering career. These quantitative findings are supported by qualitative evidence from participant focus groups highlighting the importance of mentors in shaping students' awareness of opportunities within engineering.

  16. Beyond Blackboards: Engaging Underserved Middle School Students in Engineering

    PubMed Central

    Blanchard, Sarah; Judy, Justina; Muller, Chandra; Crawford, Richard H.; Petrosino, Anthony J.; White, Christina K.; Lin, Fu-An; Wood, Kristin L.

    2015-01-01

    Beyond Blackboards is an inquiry-centered, after-school program designed to enhance middle school students’ engagement with engineering through design-based experiences focused on the 21st Century Engineering Challenges. Set within a predominantly low-income, majority-minority community, our study aims to investigate the impact of Beyond Blackboards on students’ interest in and understanding of engineering, as well as their ability to align their educational and career plans. We compare participants’ and nonparticipants’ questionnaire responses before the implementation and at the end of the program's first academic year. Statistically significant findings indicate a school-wide increase in students’ interest in engineering careers, supporting a shift in school culture. However, only program participants showed increased enjoyment of design-based strategies, understanding of what engineers do, and awareness of the steps for preparing for an engineering career. These quantitative findings are supported by qualitative evidence from participant focus groups highlighting the importance of mentors in shaping students’ awareness of opportunities within engineering. PMID:26064787

  17. Program and plans of the U.S. Geological Survey for producing information needed in National Seismic hazards and risk assessment, fiscal years 1980-84

    USGS Publications Warehouse

    Hays, Walter W.

    1979-01-01

    In accordance with the provisions of the Earthquake Hazards Reduction Act of 1977 (Public Law 95-124), the U.S. Geological Survey has developed comprehensive plans for producing information needed to assess seismic hazards and risk on a national scale in fiscal years 1980-84. These plans are based on a review of the needs of Federal Government agencies, State and local government agencies, engineers and scientists engaged in consulting and research, professional organizations and societies, model code groups, and others. The Earthquake Hazards Reduction Act provided an unprecedented opportunity for participation in a national program by representatives of State and local governments, business and industry, the design professions, and the research community. The USGS and the NSF (National Science Foundation) have major roles in the national program. The ultimate goal of the program is to reduce losses from earthquakes. Implementation of USGS research in the Earthquake Hazards Reduction Program requires the close coordination of responsibility between Federal, State and local governments. The projected research plan in national seismic hazards and risk for fiscal years 1980-84 will be accomplished by USGS and non-USGS scientists and engineers. The latter group will participate through grants and contracts. The research plan calls for (1) national maps based on existing methods, (2) improved definition of earthquake source zones nationwide, (3) development of improved methodology, (4) regional maps based on the improved methodology, and (5) post-earthquake investigations. Maps and reports designed to meet the needs, priorities, concerns, and recommendations of various user groups will be the products of this research and provide the technical basis for improved implementation.

  18. The National Aerospace Initiative (NAI): Technologies For Responsive Space Access

    NASA Technical Reports Server (NTRS)

    Culbertson, Andrew; Bhat, Biliyar N.

    2003-01-01

    The Secretary of Defense has set new goals for the Department of Defense (DOD) to transform our nation's military forces. The Director for Defense Research and Engineering (DDR&E) has responded to this challenge by defining and sponsoring a transformational initiative in Science and Technology (S&T) - the National Aerospace Initiative (NAI) - which will have a fundamental impact on our nation's military capabilities and on the aerospace industry in general. The NAI is planned as a joint effort among the tri-services, DOD agencies and National Aeronautics and Space Administration (NASA). It is comprised of three major focus areas or pillars: 1) High Speed Hypersonics (HSH), 2) Space Access (SA), and 3) Space Technology (ST). This paper addresses the Space Access pillar. The NAI-SA team has employed a unique approach to identifying critical technologies and demonstrations for satisfying both military and civilian space access capabilities needed in the future. For planning and implementation purposes the NAI-SA is divided into five technology subsystem areas: Airframe, Propulsion, Flight Subsystems, Operations and Payloads. Detailed technology roadmaps were developed under each subsystem area using a time-phased, goal oriented approach that provides critical space access capabilities in a timely manner and involves subsystem ground and flight demonstrations. This S&T plan addresses near-term (2009), mid-term (2016), and long-term (2025) goals and objectives for space access. In addition, system engineering and integration approach was used to make sure that the plan addresses the requirements of the end users. This paper describes in some detail the technologies in NAI-Space Access pillar. Some areas of emphasis are: high temperature materials, thermal protection systems, long life, lightweight, highly efficient airframes, metallic and composite cryotanks, advanced liquid rocket engines, integrated vehicle health monitoring and management, highly operable systems and payloads. Implementation strategies for NAI are also described.

  19. A lunar base reference mission for the phased implementation of bioregenerative life support system components

    NASA Technical Reports Server (NTRS)

    Dittmer, Laura N.; Drews, Michael E.; Lineaweaver, Sean K.; Shipley, Derek E.; Hoehn, A.

    1991-01-01

    Previous design efforts of a cost effective and reliable regenerative life support system (RLSS) provided the foundation for the characterization of organisms or 'biological processors' in engineering terms and a methodology was developed for their integration into an engineered ecological LSS in order to minimize the mass flow imbalances between consumers and producers. These techniques for the design and the evaluation of bioregenerative LSS have now been integrated into a lunar base reference mission, emphasizing the phased implementation of components of such a BLSS. In parallel, a designers handbook was compiled from knowledge and experience gained during past design projects to aid in the design and planning of future space missions requiring advanced RLSS technologies. The lunar base reference mission addresses in particular the phased implementation and integration of BLS parts and includes the resulting infrastructure burdens and needs such as mass, power, volume, and structural requirements of the LSS. Also, operational aspects such as manpower requirements and the possible need and application of 'robotics' were addressed.

  20. 75 FR 6305 - Approval and Promulgation of Air Quality Implementation Plans; West Virginia; Removal of NOX

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-09

    ... the electric generating units (EGUs) that are subject to the NO X SIP Call but does not apply to the... to recodify the provisions for its non-trading non-EGUs (internal combustion engines and cement kilns... and Reduction of Nitrogen Oxides from Non-Electric Generating Units As a Means to Mitigate Transport...

  1. 76 FR 76112 - Approval and Promulgation of Implementation Plans, State of California, San Joaquin Valley...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-06

    ... particular nights are not necessarily insignificant from the standpoint of PM 10 and PM 2.5 formation... winter nights to provide frost protection for certain type of crops (like citrus) when temperatures are... reasonably be estimated at approximately 15 pounds per day of NO X .\\1\\ \\1\\ Most engines are fired on propane...

  2. Optimizing Societal Benefit using a Systems Engineering Approach for Implementation of the GEOSS Space Segment

    NASA Technical Reports Server (NTRS)

    Killough, Brian D., Jr.; Sandford, Stephen P.; Cecil, L DeWayne; Stover, Shelley; Keith, Kim

    2008-01-01

    The Group on Earth Observations (GEO) is driving a paradigm shift in the Earth Observation community, refocusing Earth observing systems on GEO Societal Benefit Areas (SBA). Over the short history of space-based Earth observing systems most decisions have been made based on improving our scientific understanding of the Earth with the implicit assumption that this would serve society well in the long run. The space agencies responsible for developing the satellites used for global Earth observations are typically science driven. The innovation of GEO is the call for investments by space agencies to be driven by global societal needs. This paper presents the preliminary findings of an analysis focused on the observational requirements of the GEO Energy SBA. The analysis was performed by the Committee on Earth Observation Satellites (CEOS) Systems Engineering Office (SEO) which is responsible for facilitating the development of implementation plans that have the maximum potential for success while optimizing the benefit to society. The analysis utilizes a new taxonomy for organizing requirements, assesses the current gaps in spacebased measurements and missions, assesses the impact of the current and planned space-based missions, and presents a set of recommendations.

  3. Leaf position optimization for step-and-shoot IMRT.

    PubMed

    De Gersem, W; Claus, F; De Wagter, C; Van Duyse, B; De Neve, W

    2001-12-01

    To describe the theoretical basis, the algorithm, and implementation of a tool that optimizes segment shapes and weights for step-and-shoot intensity-modulated radiation therapy delivered by multileaf collimators. The tool, called SOWAT (Segment Outline and Weight Adapting Tool) is applied to a set of segments, segment weights, and corresponding dose distribution, computed by an external dose computation engine. SOWAT evaluates the effects of changing the position of each collimating leaf of each segment on an objective function, as follows. Changing a leaf position causes a change in the segment-specific dose matrix, which is calculated by a fast dose computation algorithm. A weighted sum of all segment-specific dose matrices provides the dose distribution and allows computation of the value of the objective function. Only leaf position changes that comply with the multileaf collimator constraints are evaluated. Leaf position changes that tend to decrease the value of the objective function are retained. After several possible positions have been evaluated for all collimating leaves of all segments, an external dose engine recomputes the dose distribution, based on the adapted leaf positions and weights. The plan is evaluated. If the plan is accepted, a segment sequencer is used to make the prescription files for the treatment machine. Otherwise, the user can restart SOWAT using the new set of segments, segment weights, and corresponding dose distribution. The implementation was illustrated using two example cases. The first example is a T1N0M0 supraglottic cancer case that was distributed as a multicenter planning exercise by investigators from Rotterdam, The Netherlands. The exercise involved a two-phase plan. Phase 1 involved the delivery of 46 Gy to a concave-shaped planning target volume (PTV) consisting of the primary tumor volume and the elective lymph nodal regions II-IV on both sides of the neck. Phase 2 involved a boost of 24 Gy to the primary tumor region only. SOWAT was applied to the Phase 1 plan. Parotid sparing was a planning goal. The second implementation example is an ethmoid sinus cancer case, planned with the intent of bilateral visus sparing. The median PTV prescription dose was 70 Gy with a maximum dose constraint to the optic pathway structures of 60 Gy. The initial set of segments, segment weights, and corresponding dose distribution were obtained, respectively, by an anatomy-based segmentation tool, a segment weight optimization tool, and a differential scatter-air ratio dose computation algorithm as external dose engine. For the supraglottic case, this resulted in a plan that proved to be comparable to the plans obtained at the other institutes by forward or inverse planning techniques. After using SOWAT, the minimum PTV dose and PTV dose homogeneity increased; the maximum dose to the spinal cord decreased from 38 Gy to 32 Gy. The left parotid mean dose decreased from 22 Gy to 19 Gy and the right parotid mean dose from 20 to 18 Gy. For the ethmoid sinus case, the target homogeneity increased by leaf position optimization, together with a better sparing of the optical tracts. By using SOWAT, the plans improved with respect to all plan evaluation end points. Compliance with the multileaf collimator constraints is guaranteed. The treatment delivery time remains almost unchanged, because no additional segments are created.

  4. Feasibility study of an Integrated Program for Aerospace-vehicle Design (IPAD) system. Volume 6: Implementation schedule, development costs, operational costs, benefit assessment, impact on company organization, spin-off assessment, phase 1, tasks 3 to 8

    NASA Technical Reports Server (NTRS)

    Garrocq, C. A.; Hurley, M. J.; Dublin, M.

    1973-01-01

    A baseline implementation plan, including alternative implementation approaches for critical software elements and variants to the plan, was developed. The basic philosophy was aimed at: (1) a progressive release of capability for three major computing systems, (2) an end product that was a working tool, (3) giving participation to industry, government agencies, and universities, and (4) emphasizing the development of critical elements of the IPAD framework software. The results of these tasks indicate an IPAD first release capability 45 months after go-ahead, a five year total implementation schedule, and a total developmental cost of 2027 man-months and 1074 computer hours. Several areas of operational cost increases were identified mainly due to the impact of additional equipment needed and additional computer overhead. The benefits of an IPAD system were related mainly to potential savings in engineering man-hours, reduction of design-cycle calendar time, and indirect upgrading of product quality and performance.

  5. Integrated guidance and control for microsatellite real-time automated proximity operations

    NASA Astrophysics Data System (ADS)

    Chen, Ying; He, Zhen; Zhou, Ding; Yu, Zhenhua; Li, Shunli

    2018-07-01

    This paper investigates the trajectory planning and control of autonomous spacecraft proximity operations with impulsive dynamics. A new integrated guidance and control scheme is developed to perform automated close-range rendezvous for underactuated microsatellites. To efficiently prevent collision, a modified RRT* trajectory planning algorithm is proposed under this context. Several engineering constraints such as collision avoidance, plume impingement, field of view and control feasibility are considered simultaneously. Then, the feedback controller that employs a turn-burn-turn strategy with a combined impulsive orbital control and finite-time attitude control is designed to ensure the implementation of planned trajectory. Finally, the performance of trajectory planner and controller are evaluated through numerical tests. Simulation results indicate the real-time implementability of the proposed integrated guidance and control scheme with position control error less than 0.5 m and velocity control error less than 0.05 m/s. Consequently, the proposed scheme offers the potential for wide applications, such as on-orbit maintenance, space surveillance and debris removal.

  6. Process, policy, and implementation of pool-wide drawdowns on the Upper Mississippi River: a promising approach for ecological restoration of large impounded rivers

    USGS Publications Warehouse

    Kenow, Kevin P.; Gretchen Benjamin,; Tim Schlagenhaft,; Ruth Nissen,; Mary Stefanski,; Gary Wege,; Scott A. Jutila,; Newton, Teresa J.

    2016-01-01

    The Upper Mississippi River (UMR) has been developed and subsequently managed for commercial navigation by the U.S. Army Corps of Engineers (USACE). The navigation pools created by a series of lock and dams initially provided a complex of aquatic habitats that supported a variety of fish and wildlife. However, biological productivity declined as the pools aged. The River Resources Forum, an advisory body to the St. Paul District of the USACE, established a multiagency Water Level Management Task Force (WLMTF) to evaluate the potential of water level management to improve ecological function and restore the distribution and abundance of fish and wildlife habitat. The WLMTF identified several water level management options and concluded that summer growing season drawdowns at the pool scale offered the greatest potential to provide habitat benefits over a large area. Here we summarize the process followed to plan and implement pool-wide drawdowns on the UMR, including involvement of stakeholders in decision making, addressing requirements to modify reservoir operating plans, development and evaluation of drawdown alternatives, pool selection, establishment of a monitoring plan, interagency coordination, and a public information campaign. Three pool-wide drawdowns were implemented within the St. Paul District and deemed successful in providing ecological benefits without adversely affecting commercial navigation and recreational use of the pools. Insights are provided based on more than 17 years of experience in planning and implementing drawdowns on the UMR. 

  7. Design concepts for low-cost composite turbofan engine frame

    NASA Technical Reports Server (NTRS)

    Mitchell, S. C.; Stoffer, L. J.

    1980-01-01

    Design concepts for low cost, lightweight composite engine frames were applied to the design requirements for the frame of a commercial, high bypass engine. Four alternative composite frame design concepts identified which consisted of generic type components and subcomponents that could be adapted to use in different locations in the engine and the different engine sizes. A variety of materials and manufacturing methods were projected with a goal for the lowest number of parts at the lowest possible cost. After a preliminary evaluation of all four frame concepts, two designs were selected for an extended design and evaluation which narrowed the final selection down to one frame that was significantly lower in cost and slighty lighter than the other frame. An implementation plan for this lowest cost frame is projected for future development and includes prospects for reducing its weight with proposed unproven, innovative fabrication techniques.

  8. Thick-film acoustic emission sensors for use in structurally integrated condition-monitoring applications.

    PubMed

    Pickwell, Andrew J; Dorey, Robert A; Mba, David

    2011-09-01

    Monitoring the condition of complex engineering structures is an important aspect of modern engineering, eliminating unnecessary work and enabling planned maintenance, preventing failure. Acoustic emissions (AE) testing is one method of implementing continuous nondestructive structural health monitoring. A novel thick-film (17.6 μm) AE sensor is presented. Lead zirconate titanate thick films were fabricated using a powder/sol composite ink deposition technique and mechanically patterned to form a discrete thick-film piezoelectric AE sensor. The thick-film sensor was benchmarked against a commercial AE device and was found to exhibit comparable responses to simulated acoustic emissions.

  9. Study and Demonstration of Planning and Scheduling Concepts for the Earth Observing System Data and Information System

    NASA Technical Reports Server (NTRS)

    Davis, Randal; Thalman, Nancy

    1993-01-01

    The University of Colorado's Laboratory for Atmospheric and Space Physics (CU/LASP) along with the Goddard Space Flight Center (GSFC) and the Jet Propulsion Laboratory (JPL) designed, implemented, tested, and demonstrated a prototype of the distributed, hierarchical planning and scheduling system comtemplated for the Earth Observing System (EOS) project. The planning and scheduling prototype made use of existing systems: CU/LASP's Operations and Science Instrument Support Planning and Scheduling (OASIS-PS) software package; GSFC's Request Oriented Scheduling Engine (ROSE); and JPL's Plan Integrated Timeliner 2 (Plan-It-2). Using these tools, four scheduling nodes were implemented and tied together using a new communications protocol for scheduling applications called the Scheduling Applications Interface Language (SAIL). An extensive and realistic scenario of EOS satellite operations was then developed and the prototype scheduling system was tested and demonstrated using the scenario. Two demonstrations of the system were given to NASA personnel and EOS core system (ECS) contractor personnel. A comprehensive volume of lessons learned was generated and a meeting was held with NASA and ECS representatives to review these lessons learned. A paper and presentation on the project's final results was given at the American Institute of Aeronautics and Astronautics Computing in Aerospace 9 conference.

  10. SOFIA Program SE and I Lessons Learned

    NASA Technical Reports Server (NTRS)

    Ray, Ronald J.; Fobel, Laura J.; Brignola, Michael P.

    2011-01-01

    Once a "Troubled Project" threatened with cancellation, the Stratospheric Observatory for Infrared Astronomy (SOFIA) Program has overcome many difficult challenges and recently achieved its first light images. To achieve success, SOFIA had to overcome significant deficiencies in fundamental Systems Engineering identified during a major Program restructuring. This presentation will summarize the lessons learn in Systems Engineering on the SOFIA Program. After the Program was reformulated, an initial assessment of Systems Engineering established the scope of the problem and helped to set a list of priorities that needed to be work. A revised Systems Engineering Management Plan (SEMP) was written to address the new Program structure and requirements established in the approved NPR7123.1A. An important result of the "Technical Planning" effort was the decision by the Program and Technical Leadership team to re-phasing the lifecycle into increments. The reformed SOFIA Program Office had to quickly develop and establish several new System Engineering core processes including; Requirements Management, Risk Management, Configuration Management and Data Management. Implementing these processes had to consider the physical and cultural diversity of the SOFIA Program team which includes two Projects spanning two NASA Centers, a major German partnership, and sub-contractors located across the United States and Europe. The SOFIA Program experience represents a creative approach to doing "System Engineering in the middle" while a Program is well established. Many challenges were identified and overcome. The SOFIA example demonstrates it is never too late to benefit from fixing deficiencies in the System Engineering processes.

  11. The development of Sustainability Graduate Community (SGC) as a learning pathway for sustainability education - a framework for engineering programmes in Malaysia Technical Universities Network (MTUN)

    NASA Astrophysics Data System (ADS)

    Johan, Kartina; Mohd Turan, Faiz

    2016-11-01

    ‘Environmental and sustainability’ is one of the Program Outcome (PO) designated by the Board of Engineers Malaysia (BEM) as one of the accreditation program requirement. However, to-date the implementation of sustainability elements in engineering programme in the technical universities in Malaysia is within individual faculty's curriculum plan and lack of university-level structured learning pathway, which enable all students to have access to an education in sustainability across all disciplines. Sustainability Graduate Community (SGC) is a framework designed to provide a learning pathway in the curriculum of engineering programs to inculcate sustainability education among engineering graduates. This paper aims to study the required attributes in Sustainability Graduate Community (SGC) framework to produce graduates who are not just engineers but also skilful in sustainability competencies using Global Project Management (GPM) P5 Standard for Sustainability. The development of the conceptual framework is to provide a constructive teaching and learning plan for educators and policy makers to work on together in developing the Sustainability Graduates (SG), the new kind of graduates from Malaysia Technical Universities Network (MTUN) in Malaysia who are literate in sustainability practices. The framework also support the call for developing holistic students based on Malaysian Education Blueprint (Higher Education) and address the gap between the statuses of engineering qualification to the expected competencies from industries in Malaysia in particular by achieving the SG attributes outlined in the framework

  12. 7 CFR 1717.604 - Long-range engineering plans and construction work plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...

  13. 7 CFR 1717.604 - Long-range engineering plans and construction work plans.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 11 2013-01-01 2013-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...

  14. 7 CFR 1717.604 - Long-range engineering plans and construction work plans.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 11 2014-01-01 2014-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...

  15. 7 CFR 1717.604 - Long-range engineering plans and construction work plans.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 11 2012-01-01 2012-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...

  16. 7 CFR 1717.604 - Long-range engineering plans and construction work plans.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 11 2011-01-01 2011-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...

  17. Cooperative Multi-Agent Mobile Sensor Platforms for Jet Engine Inspection: Concept and Implementation

    NASA Technical Reports Server (NTRS)

    Litt, Jonathan S.; Wong, Edmond; Krasowski, Michael J.; Greer, Lawrence C.

    2003-01-01

    Cooperative behavior algorithms utilizing swarm intelligence are being developed for mobile sensor platforms to inspect jet engines on-wing. Experiments are planned in which several relatively simple autonomous platforms will work together in a coordinated fashion to carry out complex maintenance-type tasks within the constrained working environment modeled on the interior of a turbofan engine. The algorithms will emphasize distribution of the tasks among multiple units; they will be scalable and flexible so that units may be added in the future; and will be designed to operate on an individual unit level to produce the desired global effect. This proof of concept demonstration will validate the algorithms and provide justification for further miniaturization and specialization of the hardware toward the true application of on-wing in situ turbine engine maintenance.

  18. Pretreatment Engineering Platform Phase 1 Final Test Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kurath, Dean E.; Hanson, Brady D.; Minette, Michael J.

    2009-12-23

    Pacific Northwest National Laboratory (PNNL) was tasked by Bechtel National Inc. (BNI) on the River Protection Project, Hanford Tank Waste Treatment and Immobilization Plant (RPP-WTP) project to conduct testing to demonstrate the performance of the WTP Pretreatment Facility (PTF) leaching and ultrafiltration processes at an engineering-scale. In addition to the demonstration, the testing was to address specific technical issues identified in Issue Response Plan for Implementation of External Flowsheet Review Team (EFRT) Recommendations - M12, Undemonstrated Leaching Processes.( ) Testing was conducted in a 1/4.5-scale mock-up of the PTF ultrafiltration system, the Pretreatment Engineering Platform (PEP). Parallel laboratory testing wasmore » conducted in various PNNL laboratories to allow direct comparison of process performance at an engineering-scale and a laboratory-scale. This report presents and discusses the results of those tests.« less

  19. MO-G-201-01: A Multi-Institutional Study Investigating the Performance of a Knowledge-Based Planning System Against Pinnacle Auto-Planning Engine in SIB-IMRT for the Head-And-Neck Cancer

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wu, B; Pang, D; Kusters, M

    Purpose: Knowledge-based Planning (KBP) founded on prior planning experience and Auto-Planning Engine (APE; commercialized in Pinnacle v9.10 TPS) based on progressive optimization algorithm both aim to eliminate the trial-and-error process in radiotherapy inverse planning. This study investigates the performance of the approaches in a multi-institutional setting to evaluate their functionalities in oropharyngeal cancer and offers suggestions how they can be implemented in the clinic. Methods: Radboud University Medical Center (RUMC) provided 35 oropharyngeal cancer patients (SIB-IMRT with two-dose-level prescription: 68 Gy to PTV68 and 50.3 Gy to PTV50.3) with corresponding comparative APE plans. Johns Hopkins University (JHU) contributed to amore » three-dose-level (70 Gy 63 Gy and 58.1 Gy) plan library for RUMC’s patient KBP generation. MedStar Georgetown University Hospital (MGUH) contributed to a KBP approach employing overlap-volume histogram (OVH-KBP) for generating RUMC’s patient KBP plans using JHU’s plan library. Since both approaches need their own user-defined parameters as initial inputs the first 10 patients were set aside as training set to finalize them. Meanwhile cross-institutional comparisons and adjustments were implemented for investigating institutions’ protocol discrepancies and the approaches’ user-defined parameters were updated accordingly. The finalized parameters were then applied to the remaining 25 patients for OVH-KBP and APE generation. A Wilcoxon rank-sum test was used for statistical comparison with significance level of p<0.05. Results: On average PTV68’s V95 was 96.5% in APE plans vs. 97% in OVH-KBP plans (p=0.36); PTV50.3’s V95 in APE plans was 97.8% vs.97.6% in OVH-KBP plans (p=0.6); cord’s D0.1 cc was 38.6 Gy in OVH-KBP plans vs. 43.7 Gy in APE plans (p=0.0001); mean doses to larynxes oral cavities parotids and submandibular glands were similar with p>0.2. Conclusions: The study demonstrates that KBP and APE can generate plans of comparable quality in a multi-institutional setting. Variations in clinical protocols can be effectively addressed for cross-institutional adaptations. Binbin Wu and Todd McNutt are the co-inventors of a patent associated with the proposed knowledge-based planning system which was licensed to Varian Medical Systems in 2015; This research was in part supported by Philips Radiation Oncology Systems.« less

  20. Fast 3D dosimetric verifications based on an electronic portal imaging device using a GPU calculation engine.

    PubMed

    Zhu, Jinhan; Chen, Lixin; Chen, Along; Luo, Guangwen; Deng, Xiaowu; Liu, Xiaowei

    2015-04-11

    To use a graphic processing unit (GPU) calculation engine to implement a fast 3D pre-treatment dosimetric verification procedure based on an electronic portal imaging device (EPID). The GPU algorithm includes the deconvolution and convolution method for the fluence-map calculations, the collapsed-cone convolution/superposition (CCCS) algorithm for the 3D dose calculations and the 3D gamma evaluation calculations. The results of the GPU-based CCCS algorithm were compared to those of Monte Carlo simulations. The planned and EPID-based reconstructed dose distributions in overridden-to-water phantoms and the original patients were compared for 6 MV and 10 MV photon beams in intensity-modulated radiation therapy (IMRT) treatment plans based on dose differences and gamma analysis. The total single-field dose computation time was less than 8 s, and the gamma evaluation for a 0.1-cm grid resolution was completed in approximately 1 s. The results of the GPU-based CCCS algorithm exhibited good agreement with those of the Monte Carlo simulations. The gamma analysis indicated good agreement between the planned and reconstructed dose distributions for the treatment plans. For the target volume, the differences in the mean dose were less than 1.8%, and the differences in the maximum dose were less than 2.5%. For the critical organs, minor differences were observed between the reconstructed and planned doses. The GPU calculation engine was used to boost the speed of 3D dose and gamma evaluation calculations, thus offering the possibility of true real-time 3D dosimetric verification.

  1. Multiple case studies of STEM teachers' orientations to science teaching through engineering design

    NASA Astrophysics Data System (ADS)

    Rupp, Madeline

    The following master's thesis is composed of two manuscripts describing STEM teachers' orientations to science teaching through engineering within the context of the Science Learning through Engineering Design (SLED) partnership. The framework guiding both studies was science teaching orientations, a component of pedagogical content knowledge. Data were collected via semi-structured interviews, multi-day classroom observations, pre- and post-observation interviews, implementation plans, and written reflections. Data sources were analyzed to generate two orientations to science teaching through engineering design for each participant. The first manuscript illustrates a single case study conducted with a sixth grade STEM teacher. Results of this study revealed a detailed picture of the teacher's goals, practices, assessments, and general views when teaching science through engineering design. Common themes across the teacher's instruction were used to characterize her orientations to science teaching through engineering design. Overall, the teacher's orientations showed a shift in her practice from didactic to student-centered methods of teaching as a result of integrating engineering design-based curriculum. The second manuscript describes a comparative case study of two sixth grade SLED participants. Results of this study revealed more complex and diverse relationships between the teachers' orientations to teaching science through engineering design and their instruction. Participants' orientations served as filters for instruction, guided by their divergent purposes for science teaching. Furthermore, their orientations and resulting implementation were developed from knowledge gained in teacher education, implying that teacher educators and researchers can use this framework to learn more about how teachers' knowledge is used to integrate engineering and science practices in the K-12 classroom.

  2. Secondary Containment Design for the LLNL B801 Diala Oil Tank

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mertesdorf, E.

    2016-12-14

    Design is to add an extension to the secondary containment of tank T1-A3 at building 801. Piping from the inner tank penetrates the secondary containment tank below the liquid level of the primary tank. To meet Oil Pollution Prevention Regulation 40 CFR 120.7 the single wall piping needs to be provided with secondary containment. Steel Tank Institute (STI) conference publication states: §112.3(d)(1)(iii) –SPCC Plan requirements- Systems shall be designed in accordance with good engineering practice, including consideration of applicable industry standards and that procedures for required inspections and testing have been established. Section 112.7(a)(2) allows for deviations from specific rulemore » requirements, provided the Owner/operator responsible to select, document and implement alternate measure and a PE certifies the SPCC Plan in accordance with good engineering practices, including consideration of industry standards« less

  3. Space station automation study. Volume 1: Executive summary. Autonomous systems and assembly

    NASA Technical Reports Server (NTRS)

    1984-01-01

    The space station automation study (SSAS) was to develop informed technical guidance for NASA personnel in the use of autonomy and autonomous systems to implement space station functions. The initial step taken by NASA in organizing the SSAS was to form and convene a panel of recognized expert technologists in automation, space sciences and aerospace engineering to produce a space station automation plan.

  4. Transitioning Domain Analysis: An Industry Experience.

    DTIC Science & Technology

    1996-06-01

    References 6 Implementation 6.1 Analysis of Operator Services’ Requirements Process 21 6.2 Preliminary Planning for FODA Training by SEI 21...an academic and industry partnership took feature oriented domain analysis ( FODA ) from a methodology that is still being defined to a well-documented...to pilot the use of the Software Engineering Institute (SEI) domain analysis methodology known as feature-oriented domain analysis ( FODA ). Supported

  5. Swift Trust in Hastily Formed Networks

    DTIC Science & Technology

    2002-01-01

    in the Engineering School. 1983 Grand Prix Award, Sales Promotion Association of Australia A national award received for the best promotion of the...deposit of over $500. The average deposit was over $2,000. 1983 Best Small Budget Award, Sales Promotion Association of Australia A national award...Australian Sales Promotion Awards. Implemented the introduction of new financial services such as automatic bill paying and telephone bill paying. Planned

  6. Building information models for astronomy projects

    NASA Astrophysics Data System (ADS)

    Ariño, Javier; Murga, Gaizka; Campo, Ramón; Eletxigerra, Iñigo; Ampuero, Pedro

    2012-09-01

    A Building Information Model is a digital representation of physical and functional characteristics of a building. BIMs represent the geometrical characteristics of the Building, but also properties like bills of quantities, definition of COTS components, status of material in the different stages of the project, project economic data, etc. The BIM methodology, which is well established in the Architecture Engineering and Construction (AEC) domain for conventional buildings, has been brought one step forward in its application for Astronomical/Scientific facilities. In these facilities steel/concrete structures have high dynamic and seismic requirements, M&E installations are complex and there is a large amount of special equipment and mechanisms involved as a fundamental part of the facility. The detail design definition is typically implemented by different design teams in specialized design software packages. In order to allow the coordinated work of different engineering teams, the overall model, and its associated engineering database, is progressively integrated using a coordination and roaming software which can be used before starting construction phase for checking interferences, planning the construction sequence, studying maintenance operation, reporting to the project office, etc. This integrated design & construction approach will allow to efficiently plan construction sequence (4D). This is a powerful tool to study and analyze in detail alternative construction sequences and ideally coordinate the work of different construction teams. In addition engineering, construction and operational database can be linked to the virtual model (6D), what gives to the end users a invaluable tool for the lifecycle management, as all the facility information can be easily accessed, added or replaced. This paper presents the BIM methodology as implemented by IDOM with the E-ELT and ATST Enclosures as application examples.

  7. CASE tools and UML: state of the ART.

    PubMed

    Agarwal, S

    2001-05-01

    With increasing need for automated tools to assist complex systems development, software design methods are becoming popular. This article analyzes the state of art in computer-aided software engineering (CASE) tools and unified modeling language (UML), focusing on their evolution, merits, and industry usage. It identifies managerial issues for the tools' adoption and recommends an action plan to select and implement them. While CASE and UML offer inherent advantages like cheaper, shorter, and efficient development cycles, they suffer from poor user satisfaction. The critical success factors for their implementation include, among others, management and staff commitment, proper corporate infrastructure, and user training.

  8. Signal analysis techniques for incipient failure detection in turbomachinery

    NASA Technical Reports Server (NTRS)

    Coffin, T.

    1985-01-01

    Signal analysis techniques for the detection and classification of incipient mechanical failures in turbomachinery were developed, implemented and evaluated. Signal analysis techniques available to describe dynamic measurement characteristics are reviewed. Time domain and spectral methods are described, and statistical classification in terms of moments is discussed. Several of these waveform analysis techniques were implemented on a computer and applied to dynamic signals. A laboratory evaluation of the methods with respect to signal detection capability is described. Plans for further technique evaluation and data base development to characterize turbopump incipient failure modes from Space Shuttle main engine (SSME) hot firing measurements are outlined.

  9. Beyond the computer-based patient record: re-engineering with a vision.

    PubMed

    Genn, B; Geukers, L

    1995-01-01

    In order to achieve real benefit from the potential offered by a Computer-Based Patient Record, the capabilities of the technology must be applied along with true re-engineering of healthcare delivery processes. University Hospital recognizes this and is using systems implementation projects, such as the catalyst, for transforming the way we care for our patients. Integration is fundamental to the success of these initiatives and this must be explicitly planned against an organized systems architecture whose standards are market-driven. University Hospital also recognizes that Community Health Information Networks will offer improved quality of patient care at a reduced overall cost to the system. All of these implementation factors are considered up front as the hospital makes its initial decisions on to how to computerize its patient records. This improves our chances for success and will provide a consistent vision to guide the hospital's development of new and better patient care.

  10. Lockheed Martin approach to a Reusable Launch Vehicle (RLV)

    NASA Astrophysics Data System (ADS)

    Elvin, John D.

    1996-03-01

    This paper discusses Lockheed Martin's perspective on the development of a cost effective Reusable Launch Vehicle (RLV). Critical to a successful Single Stage To Orbit (SSTO) program are; an economic development plan sensitive to fiscal constraints; a vehicle concept satisfying present and future US launch needs; and an operations concept commensurate with a market driven program. Participation in the economic plan by government, industry, and the commercial sector is a key element of integrating our development plan and funding profile. The RLV baseline concept design, development evolution and several critical trade studies illustrate the superior performance achieved by our innovative approach to the problem of SSTO. Findings from initial aerodynamic and aerothermodynamic wind tunnel tests and trajectory analyses on this concept confirm the superior characteristics of the lifting body shape combined with the Linear Aerospike rocket engine. This Aero Ballistic Rocket (ABR) concept captures the essence of The Skunk Works approach to SSTO RLV technology integration and system engineering. These programmatic and concept development topics chronicle the key elements to implementing an innovative market driven next generation RLV.

  11. A Spacelab Expert System for Remote Engineering and Science

    NASA Technical Reports Server (NTRS)

    Groleau, Nick; Colombano, Silvano; Friedland, Peter (Technical Monitor)

    1994-01-01

    NASA's space science program is based on strictly pre-planned activities. This approach does not always result in the best science. We describe an existing computer system that enables space science to be conducted in a more reactive manner through advanced automation techniques that have recently been used in SLS-2 October 1993 space shuttle flight. Advanced computing techniques, usually developed in the field of Artificial Intelligence, allow large portions of the scientific investigator's knowledge to be "packaged" in a portable computer to present advice to the astronaut operator. We strongly believe that this technology has wide applicability to other forms of remote science/engineering. In this brief article, we present the technology of remote science/engineering assistance as implemented for the SLS-2 space shuttle flight. We begin with a logical overview of the system (paying particular attention to the implementation details relevant to the use of the embedded knowledge for system reasoning), then describe its use and success in space, and conclude with ideas about possible earth uses of the technology in the life and medical sciences.

  12. Performance evaluation of Platform Data ManagementSystem under various degrees of protocol implementation

    NASA Technical Reports Server (NTRS)

    Arozullah, Mohammed

    1991-01-01

    The Platform Data Management System (DMS) collects Housekeeping (H/K), Payload (P/L) Engineering, and Payload Science data from various subsystems and payloads on the platform for transmission to the ground through the downlink via TDRSS. The DMS also distributes command data received from the ground to various subsystems and payloads. In addition, DMS distributes timing and safemode data. The function of collection and distribution of various types of data is performed by the Command and Data Handling (C&DH) subsystem of DMS. The C&DH subsystem uses for this purpose a number of data buses namely, Housekeeping, Payload Engineering, Payload Science, and Time and Safemode buses. Out of these buses, the H/K, P/L Engineering, and P/L Science buses are planned to be implemented by using MIL-STD 1553 bus. Most of the period covered was spent in developing a queue theoretic model of the 1553 Bus as used in the DMS. The aim is to use this model to test the performance and suitability of the 1553 Bus to the DMS under a number of alternative design scenarios.

  13. Design of an Electronic Reminder System for Supporting the Integerity of Nursing Records.

    PubMed

    Chen, Chien-Min; Hou, I-Ching; Chen, Hsiao-Ping; Weng, Yung-Ching

    2016-01-01

    The integrity of electronic nursing records (ENRs) stands for the quality of medical records. But patients' conditions are varied (e.g. not every patient had wound or need fall prevention), to achieve the integrity of ENRs depends much on clinical nurses' attention. Our study site, an one 2,300-bed hospital in northern Taiwan, there are a total of 20 ENRs including nursing assessments, nursing care plan, discharge planning etc. implemented in the whole hospital before 2014. It become important to help clinical nurses to decrease their human recall burden to complete these records. Thus, the purpose of this study was to design an ENRs reminder system (NRS) to facilitate nursing recording process. The research team consisted of an ENR engineer, a clinical head nurse and a nursing informatics specialist began to investigate NRS through three phases (e.g. information requirements; design and implementation). In early 2014, a qualitative research method was used to identify NRS information requirements through both groups (e.g. clinical nurses and their head nurses) focus interviews. According to the their requirements, one prototype was created by the nursing informatics specialist. Then the engineer used Microsoft Visual Studio 2012, C#, and Oracle to designed a web-based NRS (Figure 1). Then the integrity reminder system which including a total of twelve electronic nursing records was designed and the preliminary accuracy validation of the system was 100%. NRS could be used to support nursing recording process and prepared for implementing in the following phase.

  14. Strengthening TB infection control in specialized health facilities in Romania--using a participatory approach.

    PubMed

    Turusbekova, N; Popa, C; Dragos, M; van der Werf, M J; Dinca, I

    2016-02-01

    In 2012, the tuberculosis (TB) notification rate among Romanian TB facility doctors and nurses was 7.2 times higher than in the general population. This indicates that transmission is ongoing inside TB facilities and that TB infection control measures are insufficient. To help prevent nosocomial TB transmission a project was implemented that aimed at providing nationwide tailor-made technical assistance in TB infection control (TB-IC) in TB treatment facilities, including the development of TB infection control plans. The objective of the present article is to describe the implementation of the project and to discuss successes and challenges. The project was an implementation study using two methods of evaluation: (1) a cross sectional questionnaire study; and (2) collection of information, during the training, on challenges related to infection control and to the project implementation. The project team developed a TB facility infection control (TB-IC) plan template, together with the Romanian experts. The template was discussed and agreed upon with the experts at a meeting and thereafter distributed by email to all TB facilities. Afterwards, a training of trainers (TOT) seminar was organized which included the provision of information about different training methods, as well as information about TB-IC. The TOT was followed by training for key TB-IC providers. Information about use of the TB-IC template was gathered through a self-administered questionnaire sent to all participants of the expert meeting and the training (42 people). Additionally, non-systematized discussions were held on broader challenges in TB-IC implementation during the training. Within the project 42 key TB-IC service providers were trained in TB-IC, including 9 who were trained at a TOT seminar. The trainees were specialists working at the national level, such as country TB coordinators, or at the TB facility level: TB doctors, epidemiologists, laboratory specialists and maintenance engineers. Out of 42 key TB-IC service providers who were trained, only eighteen responded to the questionnaire (no reminders were sent). Out of these, 14 had used the TB-IC plan template after the project team disseminated it to them by email. The remaining four TB-IC service providers indicated that they were planning to use the template to develop or update their facility TB-IC plans. Related to the use of TB-IC plan template, the following broader challenges in TB-IC were identified: a lack of authority of the individuals responsible for TB-IC to implement the TB-IC measures, lack of training among facility epidemiologists on TB, underdeveloped system for reporting TB in healthcare workers, difficulties with triage of the TB suspects, and poor facility infrastructure hampering implementation of TB-IC measures. Implementing TB-IC plans in Romanian health care facilities proved to be challenging, mainly due to the fact that the national infection control plan for TB was not yet adopted at the time of project implementation, and therefore there was neither a regulatory framework to support TB facility-IC planning nor any related budget allocations for the implementation of the facilities' TB-IC plans. Nonetheless, most respondents who answered the questionnaire (18 of 42 responded) indicated that they had started using the TB-IC plan template, which represents a full package of infection control measures that, when implemented effectively and in its entirety, may be expected to reduce nosocomial transmission. The study's limitations are: very low survey response rate, thus there is a likelihood of responder bias. Copyright © 2015 The Authors. Published by Elsevier Ltd.. All rights reserved.

  15. Energy Efficient Engine: Control system preliminary definition report

    NASA Technical Reports Server (NTRS)

    Howe, David C.

    1986-01-01

    The object of the Control Preliminary Definition Program was to define a preliminary control system concept as a part of the Energy Efficient Engine program. The program was limited to a conceptual definition of a full authority digital electronic control system. System requirements were determined and a control system was conceptually defined to these requirements. Areas requiring technological development were identified and a plan was established for implementing the identified technological features, including a control technology demonstration. A significant element of this program was a study of the potential benefits of closed-loop active clearance control, along with laboratory tests of candidate clearance sensor elements for a closed loop system.

  16. Verification and Implementation of Operations Safety Controls for Flight Missions

    NASA Technical Reports Server (NTRS)

    Smalls, James R.; Jones, Cheryl L.; Carrier, Alicia S.

    2010-01-01

    There are several engineering disciplines, such as reliability, supportability, quality assurance, human factors, risk management, safety, etc. Safety is an extremely important engineering specialty within NASA, and the consequence involving a loss of crew is considered a catastrophic event. Safety is not difficult to achieve when properly integrated at the beginning of each space systems project/start of mission planning. The key is to ensure proper handling of safety verification throughout each flight/mission phase. Today, Safety and Mission Assurance (S&MA) operations engineers continue to conduct these flight product reviews across all open flight products. As such, these reviews help ensure that each mission is accomplished with safety requirements along with controls heavily embedded in applicable flight products. Most importantly, the S&MA operations engineers are required to look for important design and operations controls so that safety is strictly adhered to as well as reflected in the final flight product.

  17. An evaluation of cancer survivorship activities across national comprehensive cancer control programs

    PubMed Central

    Underwood, J. Michael; Lakhani, Naheed; Rohan, Elizabeth; Moore, Angela; Stewart, Sherri L.

    2015-01-01

    Introduction Centers for Disease Control and Prevention’s (CDC) National Comprehensive Cancer Control Program (NCCCP) funds states, the District of Columbia, tribal organizations, territories, and jurisdictions across the USA develop and implement jurisdiction-specific comprehensive cancer control (CCC) plans. The objective of this study was to analyze NCCCP action plan data for incorporation and appropriateness of cancer survivorship-specific goals and objectives. Methods In August 2013, NCCCP action plans maintained within CDC’s Chronic Disease Management Information System (CDMIS) from years 2010 to 2013 were reviewed to assess the inclusion of cancer survivorship objectives. We used the CDMIS search engine to identify “survivorship” within each plan and calculated the proportion of programs that incorporate cancer survivorship-related content during the study period and in each individual year. Cancer survivorship objectives were then categorized by compatibility with nationally accepted, recommended strategies from the report A National Action Plan for Cancer Survivorship: Advancing Public Health Strategies (NAP). Results From 2010 to 2013, 94 % (n=65) of NCCCP action plans contained survivorship content in at least 1 year during the time period and 38 % (n=26) of all NCCCP action plans addressed cancer survivorship every year during the study period. Nearly 64 % (n=44) of NCCCP action plans included cancer survivorship objectives recommended in NAP. Conclusion Nearly all NCCCP action plans addressed cancer survivorship from 2010 to 2013, and most programs implemented recommended cancer survivorship efforts during the time period. Implications for Cancer Survivors NCCCP grantees can improve cancer survivorship support by incorporating recommended efforts within each year of their plans. PMID:25732543

  18. A Roadmap for Using Agile Development in a Traditional Environment

    NASA Technical Reports Server (NTRS)

    Streiffert, Barbara; Starbird, Thomas; Grenander, Sven

    2006-01-01

    One of the newer classes of software engineering techniques is called 'Agile Development'. In Agile Development software engineers take small implementation steps and, in some cases, they program in pairs. In addition, they develop automatic tests prior to implementing their small functional piece. Agile Development focuses on rapid turnaround, incremental planning, customer involvement and continuous integration. Agile Development is not the traditional waterfall method or even a rapid prototyping method (although this methodology is closer to Agile Development). At the Jet Propulsion Laboratory (JPL) a few groups have begun Agile Development software implementations. The difficulty with this approach becomes apparent when Agile Development is used in an organization that has specific criteria and requirements handed down for how software development is to be performed. The work at the JPL is performed for the National Aeronautics and Space Agency (NASA). Both organizations have specific requirements, rules and processes for developing software. This paper will discuss some of the initial uses of the Agile Development methodology, the spread of this method and the current status of the successful incorporation into the current JPL development policies and processes.

  19. A Roadmap for Using Agile Development in a Traditional Environment

    NASA Technical Reports Server (NTRS)

    Streiffert, Barbara A.; Starbird, Thomas; Grenander, Sven

    2006-01-01

    One of the newer classes of software engineering techniques is called 'Agile Development'. In Agile Development software engineers take small implementation steps and, in some cases they program in pairs. In addition, they develop automatic tests prior to implementing their small functional piece. Agile Development focuses on rapid turnaround, incremental planning, customer involvement and continuous integration. Agile Development is not the traditional waterfall method or even a rapid prototyping method (although this methodology is closer to Agile Development). At Jet Propulsion Laboratory (JPL) a few groups have begun Agile Development software implementations. The difficulty with this approach becomes apparent when Agile Development is used in an organization that has specific criteria and requirements handed down for how software development is to be performed. The work at the JPL is performed for the National Aeronautics and Space Agency (NASA). Both organizations have specific requirements, rules and procedure for developing software. This paper will discuss the some of the initial uses of the Agile Development methodology, the spread of this method and the current status of the successful incorporation into the current JPL development policies.

  20. Implementation of Performance Assessment in STEM (Science, Technology, Engineering, Mathematics) Education to Detect Science Process Skill

    NASA Astrophysics Data System (ADS)

    Septiani, A.; Rustaman, N. Y.

    2017-02-01

    A descriptive study about the implementation of performance assessment in STEM based instruction was carried out to investigate the tenth grade of Vocational school students’ science process skills during the teaching learning processes. A number of tenth grade agriculture students was involved as research subjects selected through cluster random sampling technique (n=35). Performance assessment was planned on skills during the teaching learning process through observation and on product resulted from their engineering practice design. The procedure conducted in this study included thinking phase (identifying problem and sharing idea), designing phase, construction phase, and evaluation phase. Data was collected through the use of science process skills (SPS) test, observation sheet on student activity, as well as tasks and rubrics for performance assessment during the instruction. Research findings show that the implementation of performance assessment in STEM education in planting media could detect students science process skills better from the observation individually compared through SPS test. It was also found that the result of performance assessment was diverse when it was correlated to each indicator of SPS (strong and positive; weak and positive).

  1. D Modelling and Visualization Based on the Unity Game Engine - Advantages and Challenges

    NASA Astrophysics Data System (ADS)

    Buyuksalih, I.; Bayburt, S.; Buyuksalih, G.; Baskaraca, A. P.; Karim, H.; Rahman, A. A.

    2017-11-01

    3D City modelling is increasingly popular and becoming valuable tools in managing big cities. Urban and energy planning, landscape, noise-sewage modelling, underground mapping and navigation are among the applications/fields which really depend on 3D modelling for their effectiveness operations. Several research areas and implementation projects had been carried out to provide the most reliable 3D data format for sharing and functionalities as well as visualization platform and analysis. For instance, BIMTAS company has recently completed a project to estimate potential solar energy on 3D buildings for the whole Istanbul and now focussing on 3D utility underground mapping for a pilot case study. The research and implementation standard on 3D City Model domain (3D data sharing and visualization schema) is based on CityGML schema version 2.0. However, there are some limitations and issues in implementation phase for large dataset. Most of the limitations were due to the visualization, database integration and analysis platform (Unity3D game engine) as highlighted in this paper.

  2. Combining Architecture-Centric Engineering with the Team Software Process

    DTIC Science & Technology

    2010-12-01

    colleagues from Quarksoft and CIMAT have re- cently reported on their experiences in “Introducing Software Architecture Development Methods into a TSP...Postmortem Lessons, new goals, new requirements, new risk , etc. Business and technical goals Estimates, plans, process, commitment Work products...architecture to mitigate the risks unco- vered by the ATAM. At the end of the iteration, version 1.0 of the architec- ture is available. Implement a second

  3. KC-46 Tanker Aircraft: Program Generally Stable but Improvements in Managing Schedule Are Needed

    DTIC Science & Technology

    2013-02-27

    testing, and supplier management. An important contractual requirement (and best practice ) is for Boeing to release 90 percent of the total engineering...design is stable, and manufacturing processes are mature. As we reported last year, while the program has implemented many acquisition best practices ...assessed the program’s acquisition plan to determine compliance with acquisition legislation and acquisition best practices . What GAO Recommends GAO

  4. Sub-second pencil beam dose calculation on GPU for adaptive proton therapy.

    PubMed

    da Silva, Joakim; Ansorge, Richard; Jena, Rajesh

    2015-06-21

    Although proton therapy delivered using scanned pencil beams has the potential to produce better dose conformity than conventional radiotherapy, the created dose distributions are more sensitive to anatomical changes and patient motion. Therefore, the introduction of adaptive treatment techniques where the dose can be monitored as it is being delivered is highly desirable. We present a GPU-based dose calculation engine relying on the widely used pencil beam algorithm, developed for on-line dose calculation. The calculation engine was implemented from scratch, with each step of the algorithm parallelized and adapted to run efficiently on the GPU architecture. To ensure fast calculation, it employs several application-specific modifications and simplifications, and a fast scatter-based implementation of the computationally expensive kernel superposition step. The calculation time for a skull base treatment plan using two beam directions was 0.22 s on an Nvidia Tesla K40 GPU, whereas a test case of a cubic target in water from the literature took 0.14 s to calculate. The accuracy of the patient dose distributions was assessed by calculating the γ-index with respect to a gold standard Monte Carlo simulation. The passing rates were 99.2% and 96.7%, respectively, for the 3%/3 mm and 2%/2 mm criteria, matching those produced by a clinical treatment planning system.

  5. Development of the engineering design integration (EDIN) system: A computer aided design development

    NASA Technical Reports Server (NTRS)

    Glatt, C. R.; Hirsch, G. N.

    1977-01-01

    The EDIN (Engineering Design Integration) System which provides a collection of hardware and software, enabling the engineer to perform man-in-the-loop interactive evaluation of aerospace vehicle concepts, was considered. Study efforts were concentrated in the following areas: (1) integration of hardware with the Univac Exec 8 System; (2) development of interactive software for the EDIN System; (3) upgrading of the EDIN technology module library to an interactive status; (4) verification of the soundness of the developing EDIN System; (5) support of NASA in design analysis studies using the EDIN System; (6) provide training and documentation in the use of the EDIN System; and (7) provide an implementation plan for the next phase of development and recommendations for meeting long range objectives.

  6. High altitude mine waste remediation -- Implementation of the Idarado remedial action plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hardy, A.J.; Redmond, J.V.; River, R.A.

    1999-07-01

    The Idarado Mine in Colorado's San Juan Mountains includes 11 tailing areas, numerous waste rock dumps, and a large number of underground openings connected by over 100 miles of raises and drifts. The tailings and mine wastes were generated from different mining and milling operations between 1975 and 1978. the Idarado Remedial Action Plan (RAP) was an innovative 5-year program developed for remediating the impacts of historic mining activities in the San Miguel River and Red Mountain Creek drainages. The challenges during implementation included seasonal access limitations due to the high altitude construction areas, high volumes of runoff during snowmore » melt, numerous abandoned underground openings and stopped-out veins, and high profile sites adjacent to busy jeep trails and a major ski resort town. Implementation of the RAP has included pioneering efforts in engineering design and construction of remedial measures. Innovative engineering designs included direct revegetation techniques for the stabilization of tailings piles, concrete cutoff walls and French drains to control subsurface flows, underground water controls that included pipelines, weeplines, and portal collection systems, and various underground structures to collect and divert subsurface flows often exceeding 2,000 gpm. Remote work locations have also required the use of innovative construction techniques such as heavy lift helicopters to move construction materials to mines above 10,000 feet. This paper describes the 5-year implementation program which has included over 1,000,000 cubic yards of tailing regrading, application of 5,000 tons of manure and 26,000 tons of limestone, and construction of over 10,000 feet of pipeline and approximately 45,000 feet of diversion channel.« less

  7. Requirements, Verification, and Compliance (RVC) Database Tool

    NASA Technical Reports Server (NTRS)

    Rainwater, Neil E., II; McDuffee, Patrick B.; Thomas, L. Dale

    2001-01-01

    This paper describes the development, design, and implementation of the Requirements, Verification, and Compliance (RVC) database used on the International Space Welding Experiment (ISWE) project managed at Marshall Space Flight Center. The RVC is a systems engineer's tool for automating and managing the following information: requirements; requirements traceability; verification requirements; verification planning; verification success criteria; and compliance status. This information normally contained within documents (e.g. specifications, plans) is contained in an electronic database that allows the project team members to access, query, and status the requirements, verification, and compliance information from their individual desktop computers. Using commercial-off-the-shelf (COTS) database software that contains networking capabilities, the RVC was developed not only with cost savings in mind but primarily for the purpose of providing a more efficient and effective automated method of maintaining and distributing the systems engineering information. In addition, the RVC approach provides the systems engineer the capability to develop and tailor various reports containing the requirements, verification, and compliance information that meets the needs of the project team members. The automated approach of the RVC for capturing and distributing the information improves the productivity of the systems engineer by allowing that person to concentrate more on the job of developing good requirements and verification programs and not on the effort of being a "document developer".

  8. Establishing a `Centre for Engineering Experimentation and Design Simulation': a step towards restructuring engineering education in India

    NASA Astrophysics Data System (ADS)

    Venkateswarlu, P.

    2017-07-01

    Reforms in undergraduate engineering curriculum to produce engineers with entrepreneurial skills should address real-world problems relevant to industry and society with active industry support. Technology-assisted, hands-on projects involving experimentation, design simulation and prototyping will transform graduates into professionals with necessary skills to create and advance knowledge that meets global standards. To achieve this goal, this paper proposes establishing a central facility, 'Centre for Engineering Experimentation and Design Simulation' (CEEDS) in autonomous engineering colleges in India. The centre will be equipped with the most recent technology resources and computational facilities where students execute novel interdisciplinary product-oriented projects benefiting both industry and society. Students undertake two projects: a short-term project aimed at an engineering solution to a problem in energy, health and environment and the other a major industry-supported project devoted to a product that enhances innovation and creativity. The paper presents the current status, the theoretical and pedagogical foundation for the centre's relevance, an activity plan and its implementation in the centre for product-based learning with illustrative examples.

  9. Implementing the President's Vision: JPL and NASA's Exploration Systems Mission Directorate

    NASA Technical Reports Server (NTRS)

    Sander, Michael J.

    2006-01-01

    As part of the NASA team the Jet Propulsion Laboratory is involved in the Exploration Systems Mission Directorate (ESMD) work to implement the President's Vision for Space exploration. In this slide presentation the roles that are assigned to the various NASA centers to implement the vision are reviewed. The plan for JPL is to use the Constellation program to advance the combination of science an Constellation program objectives. JPL's current participation is to contribute systems engineering support, Command, Control, Computing and Information (C3I) architecture, Crew Exploration Vehicle, (CEV) Thermal Protection System (TPS) project support/CEV landing assist support, Ground support systems support at JSC and KSC, Exploration Communication and Navigation System (ECANS), Flight prototypes for cabin atmosphere instruments

  10. Photolithography diagnostic expert systems: a systematic approach to problem solving in a wafer fabrication facility

    NASA Astrophysics Data System (ADS)

    Weatherwax Scott, Caroline; Tsareff, Christopher R.

    1990-06-01

    One of the main goals of process engineering in the semiconductor industry is to improve wafer fabrication productivity and throughput. Engineers must work continuously toward this goal in addition to performing sustaining and development tasks. To accomplish these objectives, managers must make efficient use of engineering resources. One of the tools being used to improve efficiency is the diagnostic expert system. Expert systems are knowledge based computer programs designed to lead the user through the analysis and solution of a problem. Several photolithography diagnostic expert systems have been implemented at the Hughes Technology Center to provide a systematic approach to process problem solving. This systematic approach was achieved by documenting cause and effect analyses for a wide variety of processing problems. This knowledge was organized in the form of IF-THEN rules, a common structure for knowledge representation in expert system technology. These rules form the knowledge base of the expert system which is stored in the computer. The systems also include the problem solving methodology used by the expert when addressing a problem in his area of expertise. Operators now use the expert systems to solve many process problems without engineering assistance. The systems also facilitate the collection of appropriate data to assist engineering in solving unanticipated problems. Currently, several expert systems have been implemented to cover all aspects of the photolithography process. The systems, which have been in use for over a year, include wafer surface preparation (HMDS), photoresist coat and softbake, align and expose on a wafer stepper, and develop inspection. These systems are part of a plan to implement an expert system diagnostic environment throughout the wafer fabrication facility. In this paper, the systems' construction is described, including knowledge acquisition, rule construction, knowledge refinement, testing, and evaluation. The roles played by the process engineering expert and the knowledge engineer are discussed. The features of the systems are shown, particularly the interactive quality of the consultations and the ease of system use.

  11. Exploratory Research and Development Fund, FY 1990

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-05-01

    The Lawrence Berkeley Laboratory Exploratory R D Fund FY 1990 report is compiled from annual reports submitted by principal investigators following the close of the fiscal year. This report describes the projects supported and summarizes their accomplishments. It constitutes a part of an Exploratory R D Fund (ERF) planning and documentation process that includes an annual planning cycle, projection selection, implementation, and review. The research areas covered in this report are: Accelerator and fusion research; applied science; cell and molecular biology; chemical biodynamics; chemical sciences; earth sciences; engineering; information and computing sciences; materials sciences; nuclear science; physics and research medicinemore » and radiation biophysics.« less

  12. The Technical Work Plan Tracking Tool

    NASA Technical Reports Server (NTRS)

    Chullen, Cinda; Leighton, Adele; Weller, Richard A.; Woodfill, Jared; Parkman, William E.; Ellis, Glenn L.; Wilson, Marilyn M.

    2003-01-01

    The Technical Work Plan Tracking Tool is a web-based application that enables interactive communication and approval of contract requirements that pertain to the administration of the Science, Engineering, Analysis, and Test (SEAT) contract at Johnson Space Center. The implementation of the application has (1) shortened the Technical Work Plan approval process, (2) facilitated writing and documenting requirements in a performance-based environment with associated surveillance plans, (3) simplified the contractor s estimate of the cost for the required work, and (4) allowed for the contractor to document how they plan to accomplish the work. The application is accessible to over 300 designated NASA and contractor employees via two Web sites. For each employee, the application regulates access according to the employee s authority to enter, view, and/or print out diverse information, including reports, work plans, purchase orders, and financial data. Advanced features of this application include on-line approval capability, automatic e-mail notifications requesting review by subsequent approvers, and security inside and outside the firewall.

  13. Software Testbed for Developing and Evaluating Integrated Autonomous Subsystems

    NASA Technical Reports Server (NTRS)

    Ong, James; Remolina, Emilio; Prompt, Axel; Robinson, Peter; Sweet, Adam; Nishikawa, David

    2015-01-01

    To implement fault tolerant autonomy in future space systems, it will be necessary to integrate planning, adaptive control, and state estimation subsystems. However, integrating these subsystems is difficult, time-consuming, and error-prone. This paper describes Intelliface/ADAPT, a software testbed that helps researchers develop and test alternative strategies for integrating planning, execution, and diagnosis subsystems more quickly and easily. The testbed's architecture, graphical data displays, and implementations of the integrated subsystems support easy plug and play of alternate components to support research and development in fault-tolerant control of autonomous vehicles and operations support systems. Intelliface/ADAPT controls NASA's Advanced Diagnostics and Prognostics Testbed (ADAPT), which comprises batteries, electrical loads (fans, pumps, and lights), relays, circuit breakers, invertors, and sensors. During plan execution, an experimentor can inject faults into the ADAPT testbed by tripping circuit breakers, changing fan speed settings, and closing valves to restrict fluid flow. The diagnostic subsystem, based on NASA's Hybrid Diagnosis Engine (HyDE), detects and isolates these faults to determine the new state of the plant, ADAPT. Intelliface/ADAPT then updates its model of the ADAPT system's resources and determines whether the current plan can be executed using the reduced resources. If not, the planning subsystem generates a new plan that reschedules tasks, reconfigures ADAPT, and reassigns the use of ADAPT resources as needed to work around the fault. The resource model, planning domain model, and planning goals are expressed using NASA's Action Notation Modeling Language (ANML). Parts of the ANML model are generated automatically, and other parts are constructed by hand using the Planning Model Integrated Development Environment, a visual Eclipse-based IDE that accelerates ANML model development. Because native ANML planners are currently under development and not yet sufficiently capable, the ANML model is translated into the New Domain Definition Language (NDDL) and sent to NASA's EUROPA planning system for plan generation. The adaptive controller executes the new plan, using augmented, hierarchical finite state machines to select and sequence actions based on the state of the ADAPT system. Real-time sensor data, commands, and plans are displayed in information-dense arrays of timelines and graphs that zoom and scroll in unison. A dynamic schematic display uses color to show the real-time fault state and utilization of the system components and resources. An execution manager coordinates the activities of the other subsystems. The subsystems are integrated using the Internet Communications Engine (ICE). an object-oriented toolkit for building distributed applications.

  14. Model-based system engineering approach for the Euclid mission to manage scientific and technical complexity

    NASA Astrophysics Data System (ADS)

    Lorenzo Alvarez, Jose; Metselaar, Harold; Amiaux, Jerome; Saavedra Criado, Gonzalo; Gaspar Venancio, Luis M.; Salvignol, Jean-Christophe; Laureijs, René J.; Vavrek, Roland

    2016-08-01

    In the last years, the system engineering field is coming to terms with a paradigm change in the approach for complexity management. Different strategies have been proposed to cope with highly interrelated systems, system of systems and collaborative system engineering have been proposed and a significant effort is being invested into standardization and ontology definition. In particular, Model Based System Engineering (MBSE) intends to introduce methodologies for a systematic system definition, development, validation, deployment, operation and decommission, based on logical and visual relationship mapping, rather than traditional 'document based' information management. The practical implementation in real large-scale projects is not uniform across fields. In space science missions, the usage has been limited to subsystems or sample projects with modeling being performed 'a-posteriori' in many instances. The main hurdle for the introduction of MBSE practices in new projects is still the difficulty to demonstrate their added value to a project and whether their benefit is commensurate with the level of effort required to put them in place. In this paper we present the implemented Euclid system modeling activities, and an analysis of the benefits and limitations identified to support in particular requirement break-down and allocation, and verification planning at mission level.

  15. High Level Rule Modeling Language for Airline Crew Pairing

    NASA Astrophysics Data System (ADS)

    Mutlu, Erdal; Birbil, Ş. Ilker; Bülbül, Kerem; Yenigün, Hüsnü

    2011-09-01

    The crew pairing problem is an airline optimization problem where a set of least costly pairings (consecutive flights to be flown by a single crew) that covers every flight in a given flight network is sought. A pairing is defined by using a very complex set of feasibility rules imposed by international and national regulatory agencies, and also by the airline itself. The cost of a pairing is also defined by using complicated rules. When an optimization engine generates a sequence of flights from a given flight network, it has to check all these feasibility rules to ensure whether the sequence forms a valid pairing. Likewise, the engine needs to calculate the cost of the pairing by using certain rules. However, the rules used for checking the feasibility and calculating the costs are usually not static. Furthermore, the airline companies carry out what-if-type analyses through testing several alternate scenarios in each planning period. Therefore, embedding the implementation of feasibility checking and cost calculation rules into the source code of the optimization engine is not a practical approach. In this work, a high level language called ARUS is introduced for describing the feasibility and cost calculation rules. A compiler for ARUS is also implemented in this work to generate a dynamic link library to be used by crew pairing optimization engines.

  16. Implementation and adaptation of the Re-Engineered Discharge (RED) in five California hospitals: a qualitative research study.

    PubMed

    Mitchell, S E; Weigel, G M; Laurens, V; Martin, J; Jack, B W

    2017-04-19

    Project Re-Engineered Discharge (RED) is an evidence-based strategy to reduce readmissions disseminated and adapted by various health systems across the country. To date, little is known about how adapting Project RED from its original protocol impacts RED implementation and/or sustainability. The goal of this study was to identify and characterize contextual factors influencing how five California hospitals adapted and implemented RED and the subsequent impact on RED program sustainability. Participant observation and key informant and focus group interviews with 64 individuals at five California hospitals implementing RED in 2012 and 2013 were conducted. These involved hospital leadership, personnel responsible for Project RED implementation, hospital staff, and clinicians. Interview transcripts were coded and analyzed using a modified grounded theory approach and constant comparative analysis. Both internal and external contextual factors were identified that influenced hospitals' decisions on RED adaptation and implementation. These also impacted RED sustainability. External factors included: impending federal penalties for hospitals with high readmission rates targeting specific diagnoses, and access to external funding and technical support to help hospitals implement RED. Internal or organizational level contextual factors included: committed leadership prioritizing Project RED; RED adaptations; depth, accountability and influence of the implementation team; sustainability planning; and hospital culture. Only three of the five hospitals continued Project RED beyond the implementation period. The sustainability of RED in participating hospitals was only possible when hospitals approached RED implementation as a transformational process rather than a patient safety project, maintained a high level of fidelity to the RED protocol, and had leadership and an implementation team who embraced change and failure in the pursuit of better patient care and outcomes. Hospitals who were unsuccessful in implementing a sustainable RED process lacked all or most of these components in their approach.

  17. ThermoData Engine (TDE): software implementation of the dynamic data evaluation concept. 9. Extensible thermodynamic constraints for pure compounds and new model developments.

    PubMed

    Diky, Vladimir; Chirico, Robert D; Muzny, Chris D; Kazakov, Andrei F; Kroenlein, Kenneth; Magee, Joseph W; Abdulagatov, Ilmutdin; Frenkel, Michael

    2013-12-23

    ThermoData Engine (TDE) is the first full-scale software implementation of the dynamic data evaluation concept, as reported in this journal. The present article describes the background and implementation for new additions in latest release of TDE. Advances are in the areas of program architecture and quality improvement for automatic property evaluations, particularly for pure compounds. It is shown that selection of appropriate program architecture supports improvement of the quality of the on-demand property evaluations through application of a readily extensible collection of constraints. The basis and implementation for other enhancements to TDE are described briefly. Other enhancements include the following: (1) implementation of model-validity enforcement for specific equations that can provide unphysical results if unconstrained, (2) newly refined group-contribution parameters for estimation of enthalpies of formation for pure compounds containing carbon, hydrogen, and oxygen, (3) implementation of an enhanced group-contribution method (NIST-Modified UNIFAC) in TDE for improved estimation of phase-equilibrium properties for binary mixtures, (4) tools for mutual validation of ideal-gas properties derived through statistical calculations and those derived independently through combination of experimental thermodynamic results, (5) improvements in program reliability and function that stem directly from the recent redesign of the TRC-SOURCE Data Archival System for experimental property values, and (6) implementation of the Peng-Robinson equation of state for binary mixtures, which allows for critical evaluation of mixtures involving supercritical components. Planned future developments are summarized.

  18. Using a Software Package to Publish EAD Encoded Finding Aids: A Practical Approach and Gradual Implementation at the Archives Departementales de la Cote-d'Or, France

    ERIC Educational Resources Information Center

    Devarrewaere, Anthony; Roelly, Aude

    2005-01-01

    The Archives Departementales de la Cote-d'Or chose as a priority for its automation plan the acquisition of a search engine, to publish online archival descriptions and the library catalogue. The Archives deliberately opted for a practical approach, using for the encoding of the finding aids an automatic data export from an archival management…

  19. UNIVERSITY RESEARCH PROGRAM IN ROBOTICS, Final Technical Annual Report, Project Period: 9/1/04 - 8/31/05

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    James S. Tulenko; Carl D. Crane III

    The University Research Program in Robotics (URPR) Implementation Plan is an integrated group of universities performing fundamental research that addresses broad-based robotics and automation needs of the NNSA Directed Stockpile Work (DSW) and Campaigns. The URPR mission is to provide improved capabilities of robotics science and engineering to meet the future needs of all weapon systems and other associated NNSA/DOE activities.

  20. Guidance for Habitat Restoration Monitoring: Framework for Monitoring Plan Development and Implementation (User’s Guide)

    DTIC Science & Technology

    2004-08-01

    release; distribution is unlimited. ENGINEERING SERVICE CENTER Port Hueneme, California 93043-4370 (This page intentionally blank.) REPORT DOCUMENTATION...responses. For example, an extended period of drought may greatly retard, set back, or even prevent establishment of a desired plant species or...Categories of Potential Chemical Monitoring Dataa Monitoring Variable Habitat Type Water Quality pH REDOX DO Salinity Freshwater wetlands S−M S–M M S–M

  1. Software Management Environment (SME) concepts and architecture, revision 1

    NASA Technical Reports Server (NTRS)

    Hendrick, Robert; Kistler, David; Valett, Jon

    1992-01-01

    This document presents the concepts and architecture of the Software Management Environment (SME), developed for the Software Engineering Branch of the Flight Dynamic Division (FDD) of GSFC. The SME provides an integrated set of experience-based management tools that can assist software development managers in managing and planning flight dynamics software development projects. This document provides a high-level description of the types of information required to implement such an automated management tool.

  2. A knowledge based expert system for propellant system monitoring at the Kennedy Space Center

    NASA Technical Reports Server (NTRS)

    Jamieson, J. R.; Delaune, C.; Scarl, E.

    1985-01-01

    The Lox Expert System (LES) is the first attempt to build a realtime expert system capable of simulating the thought processes of NASA system engineers, with regard to fluids systems analysis and troubleshooting. An overview of the hardware and software describes the techniques used, and possible applications to other process control systems. LES is now in the advanced development stage, with a full implementation planned for late 1985.

  3. Current implementation and future plans on new code architecture, programming language and user interface

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brun, B.

    1997-07-01

    Computer technology has improved tremendously during the last years with larger media capacity, memory and more computational power. Visual computing with high-performance graphic interface and desktop computational power have changed the way engineers accomplish everyday tasks, development and safety studies analysis. The emergence of parallel computing will permit simulation over a larger domain. In addition, new development methods, languages and tools have appeared in the last several years.

  4. SHIELD-HIT12A - a Monte Carlo particle transport program for ion therapy research

    NASA Astrophysics Data System (ADS)

    Bassler, N.; Hansen, D. C.; Lühr, A.; Thomsen, B.; Petersen, J. B.; Sobolevsky, N.

    2014-03-01

    Purpose: The Monte Carlo (MC) code SHIELD-HIT simulates the transport of ions through matter. Since SHIELD-HIT08 we added numerous features that improves speed, usability and underlying physics and thereby the user experience. The "-A" fork of SHIELD-HIT also aims to attach SHIELD-HIT to a heavy ion dose optimization algorithm to provide MC-optimized treatment plans that include radiobiology. Methods: SHIELD-HIT12A is written in FORTRAN and carefully retains platform independence. A powerful scoring engine is implemented scoring relevant quantities such as dose and track-average LET. It supports native formats compatible with the heavy ion treatment planning system TRiP. Stopping power files follow ICRU standard and are generated using the libdEdx library, which allows the user to choose from a multitude of stopping power tables. Results: SHIELD-HIT12A runs on Linux and Windows platforms. We experienced that new users quickly learn to use SHIELD-HIT12A and setup new geometries. Contrary to previous versions of SHIELD-HIT, the 12A distribution comes along with easy-to-use example files and an English manual. A new implementation of Vavilov straggling resulted in a massive reduction of computation time. Scheduled for later release are CT import and photon-electron transport. Conclusions: SHIELD-HIT12A is an interesting alternative ion transport engine. Apart from being a flexible particle therapy research tool, it can also serve as a back end for a MC ion treatment planning system. More information about SHIELD-HIT12A and a demo version can be found on http://www.shieldhit.org.

  5. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shafer, A.L.; Purdy, S.; Tempelis, D.

    The La Paz County Regional Landfill is a 65 hectare (160 acre) municipal waste site located near the western border of Arizona between the cities of Parker and Quartzsite. The site is operated under a public/private partnership between the County of La Paz and Browning-Ferris Industries, Inc. (BFI). The County owns the landfill and infrastructure and BFI is responsible for facility improvements, environmental compliance, and daily operations. Following the initial permitting and construction of the first landfill cell, a value engineering review was conducted on the site design and permit requirements. Based on this review, substantial cost saving opportunities weremore » identified. In order to implement the value engineering ideas, the site permit was modified and a new Solid Waste Facilities Plan was Submitted to the Arizona Department of Environmental Quality. This paper discusses the value engineering modifications that were conducted, the revisions to the permits, and the relative cost savings that were realized. The areas addressed include the liner system design, closure design, disposal capacity, and operations plan. Through the use of alternative liners a cost savings of well over 50 percent (as compared to the original permit) will be realized over the life of the landfill.« less

  6. 46 CFR 107.305 - Plans and information.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... systems. Marine Engineering (z) Plans required for marine engineering equipment and systems by Subchapter F of this chapter. Electrical Engineering (aa) Plans required for electrical engineering equipment... materials that do not conform to ABS or ASTM specifications, complete specifications, including chemical and...

  7. Results Outbrief from the 2014 CombustionLab Workshop

    NASA Technical Reports Server (NTRS)

    Urban, David

    2015-01-01

    On October 24-25, 2014, NASA Headquarters and the NASA Glenn Research Center sponsored the CombustionLab Workshop in Pasadena, CA as part of the 30th Annual Meeting of the American Society for Gravitational and Space Research. The two-day event brought together scientists and engineers from academia, industry, other government agencies, and international space agencies. The goal of the workshop was to identify key engineering drivers and research priorities, and to provide overall recommendations for the development of the next generation of combustion science experiments for the International Space Station (ISS). The workshop was divided in to 6 topical areas: Droplets, Sprays and Aerosols; Non-Premixed Flames; Premixed Flames; High Pressure and Supercritical Reacting Systems; Fire Safety; Heterogeneous Reaction Processes. Each of these areas produced summary findings which were assembled into a report and were integrated into the NASA budget planning process. The summary results of this process are presented with implementation plans and options for the future.

  8. Airbreathing combined cycle engine systems

    NASA Technical Reports Server (NTRS)

    Rohde, John

    1992-01-01

    The Air Force and NASA share a common interest in developing advanced propulsion systems for commercial and military aerospace vehicles which require efficient acceleration and cruise operation in the Mach 4 to 6 flight regime. The principle engine of interest is the turboramjet; however, other combined cycles such as the turboscramjet, air turborocket, supercharged ejector ramjet, ejector ramjet, and air liquefaction based propulsion are also of interest. Over the past months careful planning and program implementation have resulted in a number of development efforts that will lead to a broad technology base for those combined cycle propulsion systems. Individual development programs are underway in thermal management, controls materials, endothermic hydrocarbon fuels, air intake systems, nozzle exhaust systems, gas turbines and ramjet ramburners.

  9. Model-Based Systems Engineering Pilot Program at NASA Langley

    NASA Technical Reports Server (NTRS)

    Vipavetz, Kevin G.; Murphy, Douglas G.; Infeld, Samatha I.

    2012-01-01

    NASA Langley Research Center conducted a pilot program to evaluate the benefits of using a Model-Based Systems Engineering (MBSE) approach during the early phase of the Materials International Space Station Experiment-X (MISSE-X) project. The goal of the pilot was to leverage MBSE tools and methods, including the Systems Modeling Language (SysML), to understand the net gain of utilizing this approach on a moderate size flight project. The System Requirements Review (SRR) success criteria were used to guide the work products desired from the pilot. This paper discusses the pilot project implementation, provides SysML model examples, identifies lessons learned, and describes plans for further use on MBSE on MISSE-X.

  10. Distributed Generation: Challenges and Opportunities, 7. edition

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    2007-10-15

    The report is a comprehensive study of the Distributed Generation (DG) industry. The report takes a wide-ranging look at the current and future state of DG and both individually and collectively addresses the technologies of Microturbines, Reciprocating Engines, Stirling Engines, Fuel Cells, Photovoltaics, Concentrating Solar, Wind, and Microgrids. Topics covered include: the key technologies being used or planned for DG; the uses of DG from utility, energy service provider, and customer viewpoints; the economics of DG; the benefits of DG from multiple perspectives; the barriers that exist to implementing DG; the government programs supporting the DG industry; and, an analysismore » of DG interconnection and net metering rules.« less

  11. Configuration evaluation and criteria plan. Volume 1: System trades study and design methodology plan (preliminary). Space Transportation Main Engine (STME) configuration study

    NASA Technical Reports Server (NTRS)

    Bair, E. K.

    1986-01-01

    The System Trades Study and Design Methodology Plan is used to conduct trade studies to define the combination of Space Shuttle Main Engine features that will optimize candidate engine configurations. This is accomplished by using vehicle sensitivities and engine parametric data to establish engine chamber pressure and area ratio design points for candidate engine configurations. Engineering analyses are to be conducted to refine and optimize the candidate configurations at their design points. The optimized engine data and characteristics are then evaluated and compared against other candidates being considered. The Evaluation Criteria Plan is then used to compare and rank the optimized engine configurations on the basis of cost.

  12. The Implementation of an Interdisciplinary Co-planning Team Model Among Mathematics and Science Teachers

    NASA Astrophysics Data System (ADS)

    Brown, Michelle Cetner

    In recent years, Science, Technology, Engineering, and Mathematics (STEM) education has become a significant focus of numerous theoretical and commentary articles as researchers have advocated for active and conceptually integrated learning in classrooms. Drawing connections between previously isolated subjects, especially mathematics and science, has been shown to increase student engagement, performance, and critical thinking skills. However, obstacles exist to the widespread implementation of integrated curricula in schools, such as teacher knowledge and school structure and culture. The Interdisciplinary Co-planning Team (ICT) model, in which teachers of different subjects come together regularly to discuss connections between content and to plan larger interdisciplinary activities and smaller examples and discussion points, offers a method for teachers to create sustainable interdisciplinary experiences for students within the bounds of the current school structure. The ICT model is designed to be an iterative, flexible model, providing teachers with both a regular time to come together as "experts" and "teach" each other important concepts from their separate disciplines, and then to bring their shared knowledge and language back to their own classrooms to implement with their students in ways that fit their individual classes. In this multiple-case study, which aims to describe the nature of the co-planning process, the nature of plans, and changes in teacher beliefs as a result of co-planning, three pairs of secondary mathematics and science teachers participated in a 10-week intervention with the ICT model. Each pair constituted one case. Data included observations, interviews, and artifact collection. All interviews, whole-group sessions, and co-planning sessions were transcribed and coded using both theory-based and data-based codes. Finally, a cross-case comparison was used to present similarities and differences across cases. Findings suggest that the ICT model can be implemented with pairs of mathematics and science teachers to create a sustainable way to share experience and expertise, and to create powerful interdisciplinary experiences for their students. In addition, there is evidence that participation with the ICT model positively influences teacher beliefs about the nature of mathematics and science, about teaching and learning, and about interdisciplinary connections. These findings seem to hold across grades, school type, and personal experience. Future implementation of the ICT model on a larger scale is recommended to continue to observe the effects on teachers and students.

  13. Reducing acquisition risk through integrated systems of systems engineering

    NASA Astrophysics Data System (ADS)

    Gross, Andrew; Hobson, Brian; Bouwens, Christina

    2016-05-01

    In the fall of 2015, the Joint Staff J7 (JS J7) sponsored the Bold Quest (BQ) 15.2 event and conducted planning and coordination to combine this event into a joint event with the Army Warfighting Assessment (AWA) 16.1 sponsored by the U.S. Army. This multipurpose event combined a Joint/Coalition exercise (JS J7) with components of testing, training, and experimentation required by the Army. In support of Assistant Secretary of the Army for Acquisition, Logistics, and Technology (ASA(ALT)) System of Systems Engineering and Integration (SoSE&I), Always On-On Demand (AO-OD) used a system of systems (SoS) engineering approach to develop a live, virtual, constructive distributed environment (LVC-DE) to support risk mitigation utilizing this complex and challenging exercise environment for a system preparing to enter limited user test (LUT). AO-OD executed a requirements-based SoS engineering process starting with user needs and objectives from Army Integrated Air and Missile Defense (AIAMD), Patriot units, Coalition Intelligence, Surveillance and Reconnaissance (CISR), Focused End State 4 (FES4) Mission Command (MC) Interoperability with Unified Action Partners (UAP), and Mission Partner Environment (MPE) Integration and Training, Tactics and Procedures (TTP) assessment. The SoS engineering process decomposed the common operational, analytical, and technical requirements, while utilizing the Institute of Electrical and Electronics Engineers (IEEE) Distributed Simulation Engineering and Execution Process (DSEEP) to provide structured accountability for the integration and execution of the AO-OD LVC-DE. As a result of this process implementation, AO-OD successfully planned for, prepared, and executed a distributed simulation support environment that responsively satisfied user needs and objectives, demonstrating the viability of an LVC-DE environment to support multiple user objectives and support risk mitigation activities for systems in the acquisition process.

  14. Voice-enabled Knowledge Engine using Flood Ontology and Natural Language Processing

    NASA Astrophysics Data System (ADS)

    Sermet, M. Y.; Demir, I.; Krajewski, W. F.

    2015-12-01

    The Iowa Flood Information System (IFIS) is a web-based platform developed by the Iowa Flood Center (IFC) to provide access to flood inundation maps, real-time flood conditions, flood forecasts, flood-related data, information and interactive visualizations for communities in Iowa. The IFIS is designed for use by general public, often people with no domain knowledge and limited general science background. To improve effective communication with such audience, we have introduced a voice-enabled knowledge engine on flood related issues in IFIS. Instead of navigating within many features and interfaces of the information system and web-based sources, the system provides dynamic computations based on a collection of built-in data, analysis, and methods. The IFIS Knowledge Engine connects to real-time stream gauges, in-house data sources, analysis and visualization tools to answer natural language questions. Our goal is the systematization of data and modeling results on flood related issues in Iowa, and to provide an interface for definitive answers to factual queries. The goal of the knowledge engine is to make all flood related knowledge in Iowa easily accessible to everyone, and support voice-enabled natural language input. We aim to integrate and curate all flood related data, implement analytical and visualization tools, and make it possible to compute answers from questions. The IFIS explicitly implements analytical methods and models, as algorithms, and curates all flood related data and resources so that all these resources are computable. The IFIS Knowledge Engine computes the answer by deriving it from its computational knowledge base. The knowledge engine processes the statement, access data warehouse, run complex database queries on the server-side and return outputs in various formats. This presentation provides an overview of IFIS Knowledge Engine, its unique information interface and functionality as an educational tool, and discusses the future plans for providing knowledge on flood related issues and resources. IFIS Knowledge Engine provides an alternative access method to these comprehensive set of tools and data resources available in IFIS. Current implementation of the system accepts free-form input and voice recognition capabilities within browser and mobile applications.

  15. Making the EZ Choice

    NASA Technical Reports Server (NTRS)

    2001-01-01

    Analytical Mechanics Associates, Inc. (AMA), of Hampton, Virginia, created the EZopt software application through Small Business Innovation Research (SBIR) funding from NASA's Langley Research Center. The new software is a user-friendly tool kit that provides quick and logical solutions to complex optimal control problems. In its most basic form, EZopt converts process data into math equations and then proceeds to utilize those equations to solve problems within control systems. EZopt successfully proved its advantage when applied to short-term mission planning and onboard flight computer implementation. The technology has also solved multiple real-life engineering problems faced in numerous commercial operations. For instance, mechanical engineers use EZopt to solve control problems with robots, while chemical plants implement the application to overcome situations with batch reactors and temperature control. In the emerging field of commercial aerospace, EZopt is able to optimize trajectories for launch vehicles and perform potential space station- keeping tasks. Furthermore, the software also helps control electromagnetic devices in the automotive industry.

  16. Some recent advances of intelligent health monitoring systems for civil infrastructures in HIT

    NASA Astrophysics Data System (ADS)

    Ou, Jinping

    2005-06-01

    The intelligent health monitoring systems more and more become a technique for ensuring the health and safety of civil infrastructures and also an important approach for research of the damage accumulation or even disaster evolving characteristics of civil infrastructures, and attracts prodigious research interests and active development interests of scientists and engineers since a great number of civil infrastructures are planning and building each year in mainland China. In this paper, some recent advances on research, development nad implementation of intelligent health monitoring systems for civil infrastructuresin mainland China, especially in Harbin Institute of Technology (HIT), P.R.China. The main contents include smart sensors such as optical fiber Bragg grating (OFBG) and polivinyllidene fluoride (PVDF) sensors, fatigue life gauges, self-sensing mortar and carbon fiber reinforced polymer (CFRP), wireless sensor networks and their implementation in practical infrastructures such as offshore platform structures, hydraulic engineering structures, large span bridges and large space structures. Finally, the relative research projects supported by the national foundation agencies of China are briefly introduced.

  17. 46 CFR 189.55-5 - Plans and specifications required for new construction.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) OCEANOGRAPHIC RESEARCH VESSELS INSPECTION AND CERTIFICATION Plan Approval § 189.55-5 Plans and specifications..., carbon dioxide, foam and sprinkling systems. (e) Marine engineering. For plans required for marine engineering equipment and systems. See Subchapter F (Marine Engineering) of this chapter. (f) Electrical...

  18. 46 CFR 189.55-5 - Plans and specifications required for new construction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) OCEANOGRAPHIC RESEARCH VESSELS INSPECTION AND CERTIFICATION Plan Approval § 189.55-5 Plans and specifications..., carbon dioxide, foam and sprinkling systems. (e) Marine engineering. For plans required for marine engineering equipment and systems. See Subchapter F (Marine Engineering) of this chapter. (f) Electrical...

  19. Perspectives and Plans for Graduate Studies. 11. Engineering 1974. E. Industrial Engineering and Systems Design. Report No. 74-22.

    ERIC Educational Resources Information Center

    Ontario Council on Graduate Studies, Toronto. Advisory Committee on Academic Planning.

    On the instruction of the Council of Ontario Universities, the Advisory Committee on Academic Planning in cooperation with the Committee of Ontario Deans of Engineering has conducted a planning assessment for doctoral work in industrial engineering and systems design. Recommendations for doctoral work in engineering studies are presented.…

  20. Harnessing expert knowledge: Defining a Bayesian network decision model with limited data-Model structure for the vibration qualification problem

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rizzo, Davinia B.; Blackburn, Mark R.

    As systems become more complex, systems engineers rely on experts to inform decisions. There are few experts and limited data in many complex new technologies. This challenges systems engineers as they strive to plan activities such as qualification in an environment where technical constraints are coupled with the traditional cost, risk, and schedule constraints. Bayesian network (BN) models provide a framework to aid systems engineers in planning qualification efforts with complex constraints by harnessing expert knowledge and incorporating technical factors. By quantifying causal factors, a BN model can provide data about the risk of implementing a decision supplemented with informationmore » on driving factors. This allows a systems engineer to make informed decisions and examine “what-if” scenarios. This paper discusses a novel process developed to define a BN model structure based primarily on expert knowledge supplemented with extremely limited data (25 data sets or less). The model was developed to aid qualification decisions—specifically to predict the suitability of six degrees of freedom (6DOF) vibration testing for qualification. The process defined the model structure with expert knowledge in an unbiased manner. Finally, validation during the process execution and of the model provided evidence the process may be an effective tool in harnessing expert knowledge for a BN model.« less

  1. Harnessing expert knowledge: Defining a Bayesian network decision model with limited data-Model structure for the vibration qualification problem

    DOE PAGES

    Rizzo, Davinia B.; Blackburn, Mark R.

    2018-03-30

    As systems become more complex, systems engineers rely on experts to inform decisions. There are few experts and limited data in many complex new technologies. This challenges systems engineers as they strive to plan activities such as qualification in an environment where technical constraints are coupled with the traditional cost, risk, and schedule constraints. Bayesian network (BN) models provide a framework to aid systems engineers in planning qualification efforts with complex constraints by harnessing expert knowledge and incorporating technical factors. By quantifying causal factors, a BN model can provide data about the risk of implementing a decision supplemented with informationmore » on driving factors. This allows a systems engineer to make informed decisions and examine “what-if” scenarios. This paper discusses a novel process developed to define a BN model structure based primarily on expert knowledge supplemented with extremely limited data (25 data sets or less). The model was developed to aid qualification decisions—specifically to predict the suitability of six degrees of freedom (6DOF) vibration testing for qualification. The process defined the model structure with expert knowledge in an unbiased manner. Finally, validation during the process execution and of the model provided evidence the process may be an effective tool in harnessing expert knowledge for a BN model.« less

  2. Making the Case for Reusable Booster Systems: The Operations Perspective

    NASA Technical Reports Server (NTRS)

    Zapata, Edgar

    2012-01-01

    Presentation to the Aeronautics Space Engineering Board National Research Council Reusable Booster System: Review and Assessment Committee. Addresses: the criteria and assumptions used in the formulation of current RBS plans; the methodologies used in the current cost estimates for RBS; the modeling methodology used to frame the business case for an RBS capability including: the data used in the analysis, the models' robustness if new data become available, and the impact of unclassified government data that was previously unavailable and which will be supplied by the USAF; the technical maturity of key elements critical to RBS implementation and the ability of current technology development plans to meet technical readiness milestones.

  3. Exploratory Research and Development Fund, FY 1990. Report on Lawrence Berkeley Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-05-01

    The Lawrence Berkeley Laboratory Exploratory R&D Fund FY 1990 report is compiled from annual reports submitted by principal investigators following the close of the fiscal year. This report describes the projects supported and summarizes their accomplishments. It constitutes a part of an Exploratory R&D Fund (ERF) planning and documentation process that includes an annual planning cycle, projection selection, implementation, and review. The research areas covered in this report are: Accelerator and fusion research; applied science; cell and molecular biology; chemical biodynamics; chemical sciences; earth sciences; engineering; information and computing sciences; materials sciences; nuclear science; physics and research medicine and radiationmore » biophysics.« less

  4. Sub-second pencil beam dose calculation on GPU for adaptive proton therapy

    NASA Astrophysics Data System (ADS)

    da Silva, Joakim; Ansorge, Richard; Jena, Rajesh

    2015-06-01

    Although proton therapy delivered using scanned pencil beams has the potential to produce better dose conformity than conventional radiotherapy, the created dose distributions are more sensitive to anatomical changes and patient motion. Therefore, the introduction of adaptive treatment techniques where the dose can be monitored as it is being delivered is highly desirable. We present a GPU-based dose calculation engine relying on the widely used pencil beam algorithm, developed for on-line dose calculation. The calculation engine was implemented from scratch, with each step of the algorithm parallelized and adapted to run efficiently on the GPU architecture. To ensure fast calculation, it employs several application-specific modifications and simplifications, and a fast scatter-based implementation of the computationally expensive kernel superposition step. The calculation time for a skull base treatment plan using two beam directions was 0.22 s on an Nvidia Tesla K40 GPU, whereas a test case of a cubic target in water from the literature took 0.14 s to calculate. The accuracy of the patient dose distributions was assessed by calculating the γ-index with respect to a gold standard Monte Carlo simulation. The passing rates were 99.2% and 96.7%, respectively, for the 3%/3 mm and 2%/2 mm criteria, matching those produced by a clinical treatment planning system.

  5. Quality-assurance plan for water-resources activities of the U.S. Geological Survey in Idaho

    USGS Publications Warehouse

    Packard, F.A.

    1996-01-01

    To ensure continued confidence in its products, the Water Resources Division of the U.S. Geological Survey implemented a policy that all its scientific work be performed in accordance with a centrally managed quality-assurance program. This report establishes and documents a formal policy for current (1995) quality assurance within the Idaho District of the U.S. Geological Survey. Quality assurance is formalized by describing district organization and operational responsibilities, documenting the district quality-assurance policies, and describing district functions. The districts conducts its work through offices in Boise, Idaho Falls, Twin Falls, Sandpoint, and at the Idaho National Engineering Laboratory. Data-collection programs and interpretive studies are conducted by two operating units, and operational and technical assistance is provided by three support units: (1) Administrative Services advisors provide guidance on various personnel issues and budget functions, (2) computer and reports advisors provide guidance in their fields, and (3) discipline specialists provide technical advice and assistance to the district and to chiefs of various projects. The district's quality-assurance plan is based on an overall policy that provides a framework for defining the precision and accuracy of collected data. The plan is supported by a series of quality-assurance policy statements that describe responsibilities for specific operations in the district's program. The operations are program planning; project planning; project implementation; review and remediation; data collection; equipment calibration and maintenance; data processing and storage; data analysis, synthesis, and interpretation; report preparation and processing; and training. Activities of the district are systematically conducted under a hierarchy of supervision an management that is designed to ensure conformance with Water Resources Division goals quality assurance. The district quality-assurance plan does not describe detailed technical activities that are commonly termed "quality-control procedures." Instead, it focuses on current policies, operations, and responsibilities that are implemented at the management level. Contents of the plan will be reviewed annually and updated as programs and operations change.

  6. Explore-create-share study: An evaluation of teachers as curriculum innovators in engineering education

    NASA Astrophysics Data System (ADS)

    Berry, Ayora

    The purpose of this study was to investigate the effects of a curriculum design-based (CDB) professional development model on K-12 teachers' capacity to integrate engineering education in the classroom. This teacher professional development approach differs from other training programs where teachers learn how to use a standard curriculum and adopt it in their classrooms. In a CDB professional development model teachers actively design lessons, student resources, and assessments for their classroom instruction. In other science, technology, engineering and mathematics (STEM) disciplines, CDB professional development has been reported to (a) position teachers as architects of change, (b) provide a professional learning vehicle for educators to reflect on instructional practices and develop content knowledge, (c) inspire a sense of ownership in curriculum decision-making among teachers, and (d) use an instructional approach that is coherent with teachers' interests and professional goals. The CDB professional development program in this study used the Explore-Create-Share (ECS) framework as an instructional model to support teacher-led curriculum design and implementation. To evaluate the impact of the CDB professional development and associated ECS instructional model, three research studies were conducted. In each study, the participants completed a six-month CDB professional development program, the PTC STEM Certificate Program, that included sixty-two instructional contact hours. Participants learned about industry and education engineering concepts, tested engineering curricula, collaborated with K-12 educators and industry professionals, and developed project-based engineering curricula using the ECS framework. The first study evaluated the impact of the CDB professional development program on teachers' engineering knowledge, self-efficacy in designing engineering curriculum, and instructional practice in developing project-based engineering units. The study included twenty-six teachers and data was collected pre-, mid-, and post-program using teacher surveys and a curriculum analysis instrument. The second study evaluated teachers' perceptions of the ECS model as a curriculum authoring tool and the quality of the curriculum units they developed. The study included sixty-two participants and data was collected post-program using teacher surveys and a curriculum analysis instrument. The third study evaluated teachers' experiences implementing ECS units in the classroom with a focus on identifying the benefits, challenges and solutions associated with project-based engineering in the classroom. The study included thirty-one participants and data was collected using an open-ended survey instrument after teachers completed implementation of the ECS curriculum unit. Results of these three studies indicate that teachers can be prepared to integrate engineering in the classroom using a CDB professional development model. Teachers reported an increase in engineering content knowledge, improved their self-efficacy in curriculum planning, and developed high quality instructional units that were aligned to engineering design practices and STEM educational standards. The ECS instructional model was acknowledged as a valuable tool for developing and implementing engineering education in the classroom. Teachers reported that ECS curriculum design aligned with their teaching goals, provided a framework to integrate engineering with other subject-area concepts, and incorporated innovative teaching strategies. After implementing ECS units in the classroom, teachers reported that the ECS model engaged students in engineering design challenges that were situated in a real world context and required the application of interdisciplinary content knowledge and skills. Teachers also reported a number of challenges related to scheduling, content alignment, and access to resources. In the face of these obstacles, teachers presented a number of solutions that included optimization of one's teaching practice, being resource savvy, and adopting a growth mindset.

  7. 78 FR 28776 - Approval and Promulgation of Implementation Plans; Georgia; State Implementation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ... Section of this Federal Register, EPA is approving the State's implementation plan revision as a direct... Promulgation of Implementation Plans; Georgia; State Implementation Plan Miscellaneous Revisions AGENCY... State Implementation Plan (SIP) submitted by the Georgia Environmental Protection Division to EPA in...

  8. Student Participation in Rover Field Trials

    NASA Astrophysics Data System (ADS)

    Bowman, C. D.; Arvidson, R. E.; Nelson, S. V.; Sherman, D. M.; Squyres, S. W.

    2001-12-01

    The LAPIS program was developed in 1999 as part of the Athena Science Payload education and public outreach, funded by the JPL Mars Program Office. For the past three years, the Athena Science Team has been preparing for 2003 Mars Exploration Rover Mission operations using the JPL prototype Field Integrated Design and Operations (FIDO) rover in extended rover field trials. Students and teachers participating in LAPIS work with them each year to develop a complementary mission plan and implement an actual portion of the annual tests using FIDO and its instruments. LAPIS is designed to mirror an end-to-end mission: Small, geographically distributed groups of students form an integrated mission team, working together with Athena Science Team members and FIDO engineers to plan, implement, and archive a two-day test mission, controlling FIDO remotely over the Internet using the Web Interface for Telescience (WITS) and communicating with each other by email, the web, and teleconferences. The overarching goal of LAPIS is to get students excited about science and related fields. The program provides students with the opportunity to apply knowledge learned in school, such as geometry and geology, to a "real world" situation and to explore careers in science and engineering through continuous one-on-one interactions with teachers, Athena Science Team mentors, and FIDO engineers. A secondary goal is to help students develop improved communication skills and appreciation of teamwork, enhanced problem-solving skills, and increased self-confidence. The LAPIS program will provide a model for outreach associated with future FIDO field trials and the 2003 Mars mission operations. The base of participation will be broadened beyond the original four sites by taking advantage of the wide geographic distribution of Athena team member locations. This will provide greater numbers of students with the opportunity to actively engage in rover testing and to explore the possibilities of science, engineering, and technology.

  9. Contingency Contractor Optimization Phase 3 Sustainment Platform Requirements - Contingency Contractor Optimization Tool - Prototype

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Durfee, Justin David; Frazier, Christopher Rawls; Bandlow, Alisa

    Sandia National Laboratories (Sandia) is in Phase 3 Sustainment of development of a prototype tool, currently referred to as the Contingency Contractor Optimization Tool - Prototype (CCOTP), under the direction of OSD Program Support. CCOT-P is intended to help provide senior Department of Defense (DoD) leaders with comprehensive insight into the global availability, readiness and capabilities of the Total Force Mix. The CCOT-P will allow senior decision makers to quickly and accurately assess the impacts, risks and mitigating strategies for proposed changes to force/capabilities assignments, apportionments and allocations options, focusing specifically on contingency contractor planning. During Phase 2 of themore » program, conducted during fiscal year 2012, Sandia developed an electronic storyboard prototype of the Contingency Contractor Optimization Tool that can be used for communication with senior decision makers and other Operational Contract Support (OCS) stakeholders. Phase 3 used feedback from demonstrations of the electronic storyboard prototype to develop an engineering prototype for planners to evaluate. Sandia worked with the DoD and Joint Chiefs of Staff strategic planning community to get feedback and input to ensure that the engineering prototype was developed to closely align with future planning needs. The intended deployment environment was also a key consideration as this prototype was developed. Initial release of the engineering prototype was done on servers at Sandia in the middle of Phase 3. In 2013, the tool was installed on a production pilot server managed by the OUSD(AT&L) eBusiness Center. The purpose of this document is to specify the CCOT-P engineering prototype platform requirements as of May 2016. Sandia developed the CCOT-P engineering prototype using common technologies to minimize the likelihood of deployment issues. CCOT-P engineering prototype was architected and designed to be as independent as possible of the major deployment components such as the server hardware, the server operating system, the database, and the web server. This document describes the platform requirements, the architecture, and the implementation details of the CCOT-P engineering prototype.« less

  10. Knowledge, attitude and practices for design for safety: A study on civil & structural engineers.

    PubMed

    Goh, Yang Miang; Chua, Sijie

    2016-08-01

    Design for safety (DfS) (also known as prevention through design, safe design and Construction (Design and Management)) promotes early consideration of safety and health hazards during the design phase of a construction project. With early intervention, hazards can be more effectively eliminated or controlled leading to safer worksites and construction processes. DfS is practiced in many countries, including Australia, the UK, and Singapore. In Singapore, the Manpower Ministry enacted the DfS Regulations in July 2015, which will be enforced from August 2016 onwards. Due to the critical role of civil and structural (C&S) engineers during design and construction, the DfS knowledge, attitude and practices (KAP) of C&S engineers have significant impact on the successful implementation of DfS. Thus, this study aims to explore the DfS KAP of C&S engineers so as to guide further research in measuring and improving DfS KAP of designers. During the study, it was found that there is a lack of KAP studies in construction management. Therefore, this study also aims to provide useful lessons for future applications of the KAP framework in construction management research. A questionnaire was developed to assess the DfS KAP of C&S engineers. The responses provided by 43 C&S engineers were analyzed. In addition, interviews with experienced construction professionals were carried out to further understand perceptions of DfS and related issues. The results suggest that C&S engineers are supportive of DfS, but the level of DfS knowledge and practices need to be improved. More DfS guidelines and training should be made available to the engineers. To ensure that DfS can be implemented successfully, there is a need to study the contractual arrangements between clients and designers and the effectiveness of different implementation approaches for the DfS process. The questionnaire and findings in this study provided the foundation for a baseline survey with larger sample size, which is currently being planned. In contrast to earlier studies, the study showed that the responding C&S engineers were supportive of the DfS. The study showed that the key to improving the DfS KAP of C&S engineers is by improving clients' motivation for DfS. Copyright © 2015 Elsevier Ltd. All rights reserved.

  11. DOE-OTM Tribology Program semiannual progress report, October 1992--March 1993

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The OTM Tribology Program supports applied research and exploratory development which private enterprise will not or cannot pursue, in specifically identified industrial problem areas pertaining to energy conservation in the transportation sector. Under the current Annual Operating Plan (AOP) the tribology project is structured to conform with the ongoing and planned research activities in three program elements: (1) advanced lubrication--experimental investigations of lubrication phenomena and the development of improved or novel lubricants and lubricant-delivery systems for current and advanced engine systems; (2) engineered tribological interfaces--research and development on various coating processes to modify the microstructure and chemical composition of near-surfacemore » regions in order to improve their friction and wear properties for use in advanced engine designs; (3) advanced tribomaterials and components--tribomaterials evaluation of the friction and wear behavior of newly emerging materials, particularly those promising low friction and wealth at elevated temperatures in advanced engine designs: and tribocomponents evaluation which focuses on development of models, analysis/design tools to enable US transportation industry to employ a tribology-by-design approach and dissemination of program developments to the US transportation industry. Project Management encompasses the administrative and managerial duties of planning, including assessments of application areas with significant tribological energy losses and opportunities for tribological advances in the transportation sector; program implementation, including the review of proposals, organization and conduct of RFP and/or ROA solicitations, selection of R and D projects; and the issues of contracts grants and purchase orders; monitoring of project activities: reporting, information exchange and technology transfer. The current organization of the tribology project, the lead responsibilities for each program element and the present contractors are shown in Table 1. Brief summaries of progress made in this are included.« less

  12. Promoting a Culture of Tailoring for Systems Engineering Policy Expectations

    NASA Technical Reports Server (NTRS)

    Blankenship, Van A.

    2016-01-01

    NASA's Marshall Space Flight Center (MSFC) has developed an integrated systems engineering approach to promote a culture of tailoring for program and project policy requirements. MSFC's culture encourages and supports tailoring, with an emphasis on risk-based decision making, for enhanced affordability and efficiency. MSFC's policy structure integrates the various Agency requirements into a single, streamlined implementation approach which serves as a "one-stop-shop" for our programs and projects to follow. The engineers gain an enhanced understanding of policy and technical expectations, as well as lesson's learned from MSFC's history of spaceflight and science missions, to enable them to make appropriate, risk-based tailoring recommendations. The tailoring approach utilizes a standard methodology to classify projects into predefined levels using selected mission and programmatic scaling factors related to risk tolerance. Policy requirements are then selectively applied and tailored, with appropriate rationale, and approved by the governing authorities, to support risk-informed decisions to achieve the desired cost and schedule efficiencies. The policy is further augmented by implementation tools and lifecycle planning aids which help promote and support the cultural shift toward more tailoring. The MSFC Customization Tool is an integrated spreadsheet that ties together everything that projects need to understand, navigate, and tailor the policy. It helps them classify their project, understand the intent of the requirements, determine their tailoring approach, and document the necessary governance approvals. It also helps them plan for and conduct technical reviews throughout the lifecycle. Policy tailoring is thus established as a normal part of project execution, with the tools provided to facilitate and enable the tailoring process. MSFC's approach to changing the culture emphasizes risk-based tailoring of policy to achieve increased flexibility, efficiency, and effectiveness in project execution, while maintaining appropriate rigor to ensure mission success.

  13. Rewriting Logic Semantics of a Plan Execution Language

    NASA Technical Reports Server (NTRS)

    Dowek, Gilles; Munoz, Cesar A.; Rocha, Camilo

    2009-01-01

    The Plan Execution Interchange Language (PLEXIL) is a synchronous language developed by NASA to support autonomous spacecraft operations. In this paper, we propose a rewriting logic semantics of PLEXIL in Maude, a high-performance logical engine. The rewriting logic semantics is by itself a formal interpreter of the language and can be used as a semantic benchmark for the implementation of PLEXIL executives. The implementation in Maude has the additional benefit of making available to PLEXIL designers and developers all the formal analysis and verification tools provided by Maude. The formalization of the PLEXIL semantics in rewriting logic poses an interesting challenge due to the synchronous nature of the language and the prioritized rules defining its semantics. To overcome this difficulty, we propose a general procedure for simulating synchronous set relations in rewriting logic that is sound and, for deterministic relations, complete. We also report on the finding of two issues at the design level of the original PLEXIL semantics that were identified with the help of the executable specification in Maude.

  14. Third Aerospace Environmental Technology Conference

    NASA Technical Reports Server (NTRS)

    Whitaker, A. F. (Editor); Cross, D. R. (Editor); Caruso, S. V. (Editor); Clark-Ingram, M. (Editor)

    1999-01-01

    The elimination of CFC's, Halons, TCA, other ozone depleting chemicals, and specific hazardous materials is well underway. The phaseout of these chemicals has mandated changes and new developments in aerospace materials and processes. We are beyond discovery and initiation of these new developments and are now in the implementation phase. This conference provided a forum for materials and processes engineers, scientists, and managers to describe, review, and critically assess the evolving replacement and clean propulsion technologies from the standpoint of their significance, application, impact on aerospace systems, and utilization by the research and development community. The use of these new technologies, their selection and qualification, their implementation, and the needs and plans for further developments are presented.

  15. Organization Readiness and ERP Implementation in Albaha University

    NASA Astrophysics Data System (ADS)

    Alaqeel, K.; Shakkah, M. S.; Rahmat, R. F.; Alfageeh, A.; Budiarto, R.

    2017-04-01

    This work studies the correlation between the organizational readiness in Albaha University and the respective Critical Success Factors with regards to the Enterprise Resource Planning (ERP) implementation. The study also considers some suggestions to improve the ABU’s ERP systems and roadmap towards the self -development strategy and to reduce vendor-dependency. A survey regarding ERP to the end-users, experts and developers in Albaha University was conducted. The analysis of the results in this work confirmed with the results of an existing work. The four significance success factors: Project Management, Business Process Re-engineering, System Integration, and Training and Education are recommended to be adopted to assure the smooth adoption of ERP at Albaha University.

  16. 14 CFR 151.111 - Advance planning proposals: General.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Engineering Proposals § 151.111 Advance planning proposals: General. (a) Each advance planning and engineering... application, under §§ 151.21(c) and 151.27, or both. (c) Each proposal must relate to planning and engineering... “Airport Activity Statistics of Certificated Route Air Carriers” (published jointly by FAA and the Civil...

  17. Ground test article for deployable space structure systems

    NASA Technical Reports Server (NTRS)

    Malloy, G. D.

    1984-01-01

    The ground test article fabrication and assembly plan was completed by Santek Engineering, Inc. The plan was reviewed and accepted by Rockwell during an on-site visit to the Santek facility. Raw material and hardware orders were placed by Santek in July. Approximately 98% of the raw materials and 10% of the hardware deliveries have been completed. Several material and hardware substitutions were requested by Santek due to no-bid responses from suppliers or excessive costs for limited quantity items. These substitutions were evaluated and approved by Rockwell Engineering and Material and Process and are being incorporated into the drawing package. Santek started fabrication of detail parts in mid-August. Their current resource utilization is at approximately 50% of the planned eventual commitment and is increasing at a rate commensurate with the fabrication and assembly plan. At this writing, Santek's estimate of completion is 03%. During verification testing of the diagonal member joint, in a program funded by Rockwell discretionary funds, the axial load to unlock the joint was found to increase significantly after a few cycles of operation. This was attributed to galling, poor lubrication, and locking pin geometry. A change of materials, lubricant, and modification of the pin geometry reduced the unlocking load and provided repeatability after 50 cycles of operation. This new design is being implemented into the ground test article.

  18. Engineering thinking in emergency situations: A new nuclear safety concept

    PubMed Central

    Guarnieri, Franck; Travadel, Sébastien

    2014-01-01

    The lessons learned from the Fukushima Daiichi accident have focused on preventive measures designed to protect nuclear reactors, and crisis management plans. Although there is still no end in sight to the accident that occurred on March 11, 2011, how engineers have handled the aftermath offers new insight into the capacity of organizations to adapt in situations that far exceed the scope of safety standards based on probabilistic risk assessment and on the comprehensive identification of disaster scenarios. Ongoing crises in which conventional resources are lacking, but societal expectations are high, call for “engineering thinking in emergency situations.” This is a new concept that emphasizes adaptability and resilience within organizations—such as the ability to create temporary new organizational structures; to quickly switch from a normal state to an innovative mode; and to integrate a social dimension into engineering activities. In the future, nuclear safety oversight authorities should assess the ability of plant operators to create and implement effective engineering strategies on the fly, and should require that operators demonstrate the capability for resilience in the aftermath of an accident. PMID:25419015

  19. Engineering thinking in emergency situations: A new nuclear safety concept.

    PubMed

    Guarnieri, Franck; Travadel, Sébastien

    2014-11-01

    The lessons learned from the Fukushima Daiichi accident have focused on preventive measures designed to protect nuclear reactors, and crisis management plans. Although there is still no end in sight to the accident that occurred on March 11, 2011, how engineers have handled the aftermath offers new insight into the capacity of organizations to adapt in situations that far exceed the scope of safety standards based on probabilistic risk assessment and on the comprehensive identification of disaster scenarios. Ongoing crises in which conventional resources are lacking, but societal expectations are high, call for "engineering thinking in emergency situations." This is a new concept that emphasizes adaptability and resilience within organizations-such as the ability to create temporary new organizational structures; to quickly switch from a normal state to an innovative mode; and to integrate a social dimension into engineering activities. In the future, nuclear safety oversight authorities should assess the ability of plant operators to create and implement effective engineering strategies on the fly, and should require that operators demonstrate the capability for resilience in the aftermath of an accident.

  20. Zero to Integration in Eight Months, the Dawn Ground Data System Engineering Challenge

    NASA Technical Reports Server (NTRS)

    Dubon, Lydia P.

    2006-01-01

    The Dawn Project has presented the Ground Data System (GDS) with technical challenges driven by cost and schedule constraints commonly associated with National Aeronautics and Space Administration (NASA) Discovery Projects. The Dawn mission consists of a new and exciting Deep Space partnership among: the Jet Propulsion Laboratory (JPL), manages the project and is responsible for flight operation; Orbital Sciences Corporation (OSC), is the spacecraft builder and is responsible for flight system test and integration; and the University of California, at Los Angeles (UCLA), is responsible for science planning and operations. As a cost-capped mission, one of Dawn's implementation strategies is to leverage from both flight and ground heritage. OSC's ground data system is used for flight system test and integration as part of the flight heritage strategy. Mission operations, however, are to be conducted with JPL's ground system. The system engineering challenge of dealing with two heterogeneous ground systems emerged immediately. During the first technical interchange meeting between the JPL's GDS Team and OSC's Flight Software Team, August 2003, the need to integrate the ground system with the flight software was brought to the table. This need was driven by the project's commitment to enable instrument engineering model integration in a spacecraft simulator environment, for both demonstration and risk mitigation purposes, by April 2004. This paper will describe the system engineering approach that was undertaken by JPL's GDS Team in order to meet the technical challenge within a non-negotiable eight-month schedule. Key to the success was adherence to fundamental systems engineering practices: decomposition of the project request into manageable requirements; integration of multiple ground disciplines and experts into a focused team effort; definition of a structured yet flexible development process; definition of an in-process risk reduction plan; and aggregation of the intermediate products to an integrated final product. In addition, this paper will highlight the role of lessons learned from the integration experience. The lessons learned from an early GDS deployment have served as the foundation for the design and implementation of the Dawn Ground Data System.

  1. Embedding Agile Practices within a Plan-Driven Hierarchical Project Life Cycle

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Millard, W. David; Johnson, Daniel M.; Henderson, John M.

    2014-07-28

    Organizations use structured, plan-driven approaches to provide continuity, direction, and control to large, multi-year programs. Projects within these programs vary greatly in size, complexity, level of maturity, technical risk, and clarity of the development objectives. Organizations that perform exploratory research, evolutionary development, and other R&D activities can obtain the benefits of Agile practices without losing the benefits of their program’s overarching plan-driven structure. This paper describes application of Agile development methods on a large plan-driven sensor integration program. While the client employed plan-driven, requirements flow-down methodologies, tight project schedules and complex interfaces called for frequent end-to-end demonstrations to provide feedbackmore » during system development. The development process maintained the many benefits of plan-driven project execution with the rapid prototyping, integration, demonstration, and client feedback possible through Agile development methods. This paper also describes some of the tools and implementing mechanisms used to transition between and take advantage of each methodology, and presents lessons learned from the project management, system engineering, and developer’s perspectives.« less

  2. Computational materials science and engineering education: A survey of trends and needs

    NASA Astrophysics Data System (ADS)

    Thornton, K.; Nola, Samanthule; Edwin Garcia, R.; Asta, Mark; Olson, G. B.

    2009-10-01

    Results from a recent reassessment of the state of computational materials science and engineering (CMSE) education are reported. Surveys were distributed to the chairs and heads of materials programs, faculty members engaged in computational research, and employers of materials scientists and engineers, mainly in the United States. The data was compiled to assess current course offerings related to CMSE, the general climate for introducing computational methods in MSE curricula, and the requirements from the employers’ viewpoint. Furthermore, the available educational resources and their utilization by the community are examined. The surveys show a general support for integrating computational content into MSE education. However, they also reflect remaining issues with implementation, as well as a gap between the tools being taught in courses and those that are used by employers. Overall, the results suggest the necessity for a comprehensively developed vision and plans to further the integration of computational methods into MSE curricula.

  3. Marshall Space Flight Center CFD overview

    NASA Technical Reports Server (NTRS)

    Schutzenhofer, Luke A.

    1989-01-01

    Computational Fluid Dynamics (CFD) activities at Marshall Space Flight Center (MSFC) have been focused on hardware specific and research applications with strong emphasis upon benchmark validation. The purpose here is to provide insight into the MSFC CFD related goals, objectives, current hardware related CFD activities, propulsion CFD research efforts and validation program, future near-term CFD hardware related programs, and CFD expectations. The current hardware programs where CFD has been successfully applied are the Space Shuttle Main Engines (SSME), Alternate Turbopump Development (ATD), and Aeroassist Flight Experiment (AFE). For the future near-term CFD hardware related activities, plans are being developed that address the implementation of CFD into the early design stages of the Space Transportation Main Engine (STME), Space Transportation Booster Engine (STBE), and the Environmental Control and Life Support System (ECLSS) for the Space Station. Finally, CFD expectations in the design environment will be delineated.

  4. Science and Engineering Alliance, Inc., Annual Report 1993

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1994-01-01

    Science and Engineering Alliance (SEA) is a not-for-profit corporation formed by four Historically Black Colleges and Universities (HBCUs) and a leading national laboratory. The four HBCU Institutions are: Alabama A and M University, Jackson State University, Prairie View A and M University, and Southern University and A and M College. The national laboratory is Lawrence Livermore National Laboratory. This was a year of continued focusing for SEA. Guided by the belief that involving faculty and students in high-quality research, coupled with implementing action plans to enhance the research infrastructure of the universities will lead to the production of well-qualified African-Americanmore » scientists and engineers, SEA research agenda became one of the primary focus. The Research Design Teams represents SEA's vanguard activity, and their work this past year reflected the commitment to producing technical talent of the highest quality.« less

  5. Perspectives and Plans for Graduate Studies. 11. Engineering 1974. D. Mechanical Engineering. Report No. 74-21.

    ERIC Educational Resources Information Center

    Ontario Council on Graduate Studies, Toronto. Advisory Committee on Academic Planning.

    On the instruction of the Council of Ontario Universities, the Advisory Committee on Academic Planning in cooperation with the Committee of Ontario Deans of Engineering has conducted a planning assessment for doctoral work in mechanical engineering. This report presents as overview of the recommendations for each of the assessments conducted in…

  6. Pricing by timing: innovating broadband data plans

    NASA Astrophysics Data System (ADS)

    Ha, Sangtae; Joe-Wong, Carlee; Sen, Soumya; Chiang, Mung

    2012-01-01

    Wireless Internet usage is doubling every year. Users are using more of high bandwidth data applications, and the heavy usage concentrates on several peak hours in a day, forcing ISPs to overprovision their networks accordingly. In order to remain profitable, ISPs have been using pricing as a congestion management tool. We review many of such pricing schemes in practice today and argue that they do not solve ISPs' problem of growing data traffic. We believe that dynamic, time-dependent usage pricing, which charges users based on when they access the Internet, can incentivize users to spread out their bandwidth consumption more evenly across different times of the day, thus helping ISPs to overcome the problem of peak congestion. Congestion pricing is not a new idea in itself, but the time for its implementation in data networks has finally arrived. Our key contribution lies in developing new analysis and a fully integrated system architecture, called TUBE (Time-dependent Usage-based Broadband price Engineering) that enables ISPs to implement the proposed TDP plan. The theory, simulation, and system implementation of TUBE system is further complemented with consumer surveys conducted in India and the US, along with preparations for a field trial that is currently underway.

  7. 50 CFR 600.1008 - Implementation plan and implementation regulations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 50 Wildlife and Fisheries 8 2010-10-01 2010-10-01 false Implementation plan and implementation... Capacity Reduction Framework § 600.1008 Implementation plan and implementation regulations. (a) As soon as... period, a proposed implementation plan and implementation regulations. During the public comment period...

  8. Great Lakes Steel -- PCI facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Eichinger, F.T.; Dake, S.H.; Wagner, E.D.

    1997-12-31

    This paper discusses the planning, design, and start-up of the 90 tph PCI facility for National Steel`s Great Lakes Steel Division in River Rouge, MI. This project is owned and operated by Edison Energy Services, and was implemented on a fast-track basis by Raytheon Engineers and Constructors, Babcock Material Handling, and Babcock and Wilcox. This paper presents important process issues, basic design criteria, an the challenges of engineering and building a state-of-the-art PCI facility in two existing plants. Pulverized coal is prepared at the River Rouge Power Plant of Detroit Edison, is pneumatically conveyed 6,000 feet to a storage silomore » at Great Lakes Steel, and is injected into three blast furnaces.« less

  9. Advanced Launch System propulsion focused technology liquid methane turbopump technical implementation plan

    NASA Technical Reports Server (NTRS)

    Csomor, A.; Nielson, C. E.

    1989-01-01

    This program will focus on the integration of all functional disciplines of the design, manufacturing, materials, fabrication and producibility to define and demonstrate a highly reliable, easily maintained, low cost liquid methane turbopump as a component for the STBE (Space Transportation Booster Engine) using the STME (main engine) oxygen turbopump. A cost model is to be developed to predict the recurring cost of production hardware and operations. A prime objective of the program is to design the liquid methane turbopump to be used in common with a LH2 turbopump optimized for the STME. Time phasing of the effort is presented and interrelationship of the tasks is defined. Major subcontractors are identified and their roles in the program are described.

  10. Launching AI in NASA ground systems

    NASA Technical Reports Server (NTRS)

    Perkins, Dorothy C.; Truszkowski, Walter F.

    1990-01-01

    This paper will discuss recent operational successes in implementing expert systems to support the complex functions of NASA mission control systems at the Goddard Space Flight Center, including fault detection and diagnosis for real time and engineering analysis functions in the Cosmic Background Explorer and Gamma Ray Observatory missions and automation of resource planning and scheduling functions for various missions. It will also discuss ongoing developments and prototypes that will lead to increasingly sophisticated applications of artificial intelligence. These include the use of neural networks to perform telemetry monitoring functions, the implementation of generic expert system shells that can be customized to telemetry handling functions specific to NASA control centers, the applications of AI in training and user support, the long-term potential of implementing systems based around distributed, cooperative problem solving, and the use of AI to control and assist system development activities.

  11. The 2-8 GHz solar dynamic spectra and polarization measurement feasibility study

    NASA Technical Reports Server (NTRS)

    Haddock, F. T.

    1971-01-01

    The preliminary system design of a Solar Microwave Spectrograph (SMS) is presented. This design resulted from a study to determine the feasibility of measuring solar polarization and dynamic spectra over the range of two to eight GHz, using broadband radio frequency instrumentation and rapid recording equipment in conjunction with radio telescopes. The scientific value of the proposed SMS instrument is discussed, with remarks concerning data reduction and analysis and a presentation of the engineering plan to implement the SMS system.

  12. The development of internet based ship design support system for small and medium sized shipyards

    NASA Astrophysics Data System (ADS)

    Shin, Sung-Chul; Lee, Soon-Sup; Kang, Dong-Hoon; Lee, Kyung-Ho

    2012-03-01

    In this paper, a prototype of ship basic planning system is implemented for the small and medium sized shipyards based on the internet technology and concurrent engineering concept. The system is designed from the user requirements. Consequently, standardized development environment and tools are selected. These tools are used for the system development to define and evaluate core application technologies. The system will contribute to increasing competitiveness of small and medium sized shipyards in the 21st century industrial en-vironment.

  13. SU-E-T-488: An Iso-Dose Curve Based Interactive IMRT Optimization System for Physician-Driven Plan Tuning

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shi, F; Tian, Z; Jia, X

    Purpose: In treatment plan optimization for Intensity Modulated Radiation Therapy (IMRT), after a plan is initially developed by a dosimetrist, the attending physician evaluates its quality and often would like to improve it. As opposed to having the dosimetrist implement the improvements, it is desirable to have the physician directly and efficiently modify the plan for a more streamlined and effective workflow. In this project, we developed an interactive optimization system for physicians to conveniently and efficiently fine-tune iso-dose curves. Methods: An interactive interface is developed under C++/Qt. The physician first examines iso-dose lines. S/he then picks an iso-dose curvemore » to be improved and drags it to a more desired configuration using a computer mouse or touchpad. Once the mouse is released, a voxel-based optimization engine is launched. The weighting factors corresponding to voxels between the iso-dose lines before and after the dragging are modified. The underlying algorithm then takes these factors as input to re-optimize the plan in near real-time on a GPU platform, yielding a new plan best matching the physician's desire. The re-optimized DVHs and iso-dose curves are then updated for the next iteration of modifications. This process is repeated until a physician satisfactory plan is achieved. Results: We have tested this system for a series of IMRT plans. Results indicate that our system provides the physicians an intuitive and efficient tool to edit the iso-dose curves according to their preference. The input information is used to guide plan re-optimization, which is achieved in near real-time using our GPU-based optimization engine. Typically, a satisfactory plan can be developed by a physician in a few minutes using this tool. Conclusion: With our system, physicians are able to manipulate iso-dose curves according to their preferences. Preliminary results demonstrate the feasibility and effectiveness of this tool.« less

  14. SU-F-T-100: Development and Implementation of a Treatment Planning Tracking System Into the Radiation Oncology Clinic

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kabat, C; Cline, K; Li, Y

    Purpose: With increasing numbers of cancer patients being diagnosed and the complexity of radiotherapy treatments rising it’s paramount that patient plan development continues to stay fluid within the clinic. In order to maintain a high standard of care and clinical efficiency the establishment of a tracking system for patient plan development allows healthcare providers to view real time plan progression and drive clinical workflow. In addition, it provides statistical datasets which can further identify inefficiencies within the clinic. Methods: An application was developed utilizing Microsoft’s ODBC SQL database engine to track patient plan status throughout the treatment planning process whilemore » also managing key factors pertaining to the patient’s treatment. Pertinent information is accessible to staff in many locations, including tracking monitors within dosimetry, the clinic network for both computers and handheld devices, and through email notifications. Plans are initiated with a CT and continually tracked through planning stages until final approval by staff. Patient’s status is dynamically updated by the physicians, dosimetrists, and medical physicists based on the stage of the patient’s plan. Results: Our application has been running over a six month period with all patients being processed through the system. Modifications have been made to allow for new features to be implemented along with additional tracking parameters. Based on in-house feedback, the application has been supportive in streamlining patient plans through the treatment planning process and data has been accumulating to further improve procedures within the clinic. Conclusion: Over time the clinic will continue to track data with this application. As data accumulates the clinic will be able to highlight inefficiencies within the workflow and adapt accordingly. We will add in new features to help support the treatment planning process in the future.« less

  15. Impact of distributed virtual reality on engineering knowledge retention and student engagement

    NASA Astrophysics Data System (ADS)

    Sulbaran, Tulio Alberto

    Engineering Education is facing many problems, one of which is poor knowledge retention among engineering students. This problem affects the Architecture, Engineering, and Construction (A/E/C) industry, because students are unprepared for many necessary job skills. This problem of poor knowledge retention is caused by many factors, one of which is the mismatch between student learning preferences and the media used to teach engineering. The purpose of this research is to assess the impact of Distributed Virtual Reality (DVR) as an engineering teaching tool. The implementation of DVR addresses the issue of poor knowledge retention by impacting the mismatch between learning and teaching style in the visual versus verbal spectrum. Using as a point of departure three knowledge domain areas (Learning and Instruction, Distributed Virtual Reality and Crane Selection as Part of Crane Lift Planning), a DVR engineering teaching tool is developed, deployed and assessed in engineering classrooms. The statistical analysis of the data indicates that: (1) most engineering students are visual learners; (2) most students would like more classes using DVR; (3) engineering students find DVR more engaging than traditional learning methods; (4) most students find the responsiveness of the DVR environments to be either good or very good; (5) all students are able to interact with DVR and most of the students found it easy or very easy to navigate (without previous formal training in how to use DVR); (6) students' knowledge regarding the subject (crane selection) is higher after the experiment; and, (7) students' using different instructional media do not demonstrate statistical difference in knowledge retained after the experiment. This inter-disciplinary research offers opportunities for direct and immediate application in education, research, and industry, due to the fact that the instructional module developed (on crane selection as part of construction crane lift planning) can be used to convey knowledge to engineers beyond the classrooms. This instructional module can also be used as a workbench to assess parameters on engineering education such as time on task, assessment media, and long-term retention among others.

  16. Use of Soft Computing Technologies for a Qualitative and Reliable Engine Control System for Propulsion Systems

    NASA Technical Reports Server (NTRS)

    Trevino, Luis; Brown, Terry; Crumbley, R. T. (Technical Monitor)

    2001-01-01

    The problem to be addressed in this paper is to explore how the use of Soft Computing Technologies (SCT) could be employed to improve overall vehicle system safety, reliability, and rocket engine performance by development of a qualitative and reliable engine control system (QRECS). Specifically, this will be addressed by enhancing rocket engine control using SCT, innovative data mining tools, and sound software engineering practices used in Marshall's Flight Software Group (FSG). The principle goals for addressing the issue of quality are to improve software management, software development time, software maintenance, processor execution, fault tolerance and mitigation, and nonlinear control in power level transitions. The intent is not to discuss any shortcomings of existing engine control methodologies, but to provide alternative design choices for control, implementation, performance, and sustaining engineering, all relative to addressing the issue of reliability. The approaches outlined in this paper will require knowledge in the fields of rocket engine propulsion (system level), software engineering for embedded flight software systems, and soft computing technologies (i.e., neural networks, fuzzy logic, data mining, and Bayesian belief networks); some of which are briefed in this paper. For this effort, the targeted demonstration rocket engine testbed is the MC-1 engine (formerly FASTRAC) which is simulated with hardware and software in the Marshall Avionics & Software Testbed (MAST) laboratory that currently resides at NASA's Marshall Space Flight Center, building 4476, and is managed by the Avionics Department. A brief plan of action for design, development, implementation, and testing a Phase One effort for QRECS is given, along with expected results. Phase One will focus on development of a Smart Start Engine Module and a Mainstage Engine Module for proper engine start and mainstage engine operations. The overall intent is to demonstrate that by employing soft computing technologies, the quality and reliability of the overall scheme to engine controller development is further improved and vehicle safety is further insured. The final product that this paper proposes is an approach to development of an alternative low cost engine controller that would be capable of performing in unique vision spacecraft vehicles requiring low cost advanced avionics architectures for autonomous operations from engine pre-start to engine shutdown.

  17. 7 CFR 1710.250 - General.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., and retirements. The primary components of the system consist of long-range engineering plans, construction work plans (CWPs), CWP amendments, and special engineering and cost studies. Long range engineering plans identify plant investments required over a period of 10 years or more. CWPs specify and...

  18. 7 CFR 1710.250 - General.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., and retirements. The primary components of the system consist of long-range engineering plans, construction work plans (CWPs), CWP amendments, and special engineering and cost studies. Long range engineering plans identify plant investments required over a period of 10 years or more. CWPs specify and...

  19. 7 CFR 1710.250 - General.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., and retirements. The primary components of the system consist of long-range engineering plans, construction work plans (CWPs), CWP amendments, and special engineering and cost studies. Long range engineering plans identify plant investments required over a period of 10 years or more. CWPs specify and...

  20. 7 CFR 1710.250 - General.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., and retirements. The primary components of the system consist of long-range engineering plans, construction work plans (CWPs), CWP amendments, and special engineering and cost studies. Long range engineering plans identify plant investments required over a period of 10 years or more. CWPs specify and...

  1. Multi-GPU configuration of 4D intensity modulated radiation therapy inverse planning using global optimization

    NASA Astrophysics Data System (ADS)

    Hagan, Aaron; Sawant, Amit; Folkerts, Michael; Modiri, Arezoo

    2018-01-01

    We report on the design, implementation and characterization of a multi-graphic processing unit (GPU) computational platform for higher-order optimization in radiotherapy treatment planning. In collaboration with a commercial vendor (Varian Medical Systems, Palo Alto, CA), a research prototype GPU-enabled Eclipse (V13.6) workstation was configured. The hardware consisted of dual 8-core Xeon processors, 256 GB RAM and four NVIDIA Tesla K80 general purpose GPUs. We demonstrate the utility of this platform for large radiotherapy optimization problems through the development and characterization of a parallelized particle swarm optimization (PSO) four dimensional (4D) intensity modulated radiation therapy (IMRT) technique. The PSO engine was coupled to the Eclipse treatment planning system via a vendor-provided scripting interface. Specific challenges addressed in this implementation were (i) data management and (ii) non-uniform memory access (NUMA). For the former, we alternated between parameters over which the computation process was parallelized. For the latter, we reduced the amount of data required to be transferred over the NUMA bridge. The datasets examined in this study were approximately 300 GB in size, including 4D computed tomography images, anatomical structure contours and dose deposition matrices. For evaluation, we created a 4D-IMRT treatment plan for one lung cancer patient and analyzed computation speed while varying several parameters (number of respiratory phases, GPUs, PSO particles, and data matrix sizes). The optimized 4D-IMRT plan enhanced sparing of organs at risk by an average reduction of 26% in maximum dose, compared to the clinical optimized IMRT plan, where the internal target volume was used. We validated our computation time analyses in two additional cases. The computation speed in our implementation did not monotonically increase with the number of GPUs. The optimal number of GPUs (five, in our study) is directly related to the hardware specifications. The optimization process took 35 min using 50 PSO particles, 25 iterations and 5 GPUs.

  2. Multi-GPU configuration of 4D intensity modulated radiation therapy inverse planning using global optimization.

    PubMed

    Hagan, Aaron; Sawant, Amit; Folkerts, Michael; Modiri, Arezoo

    2018-01-16

    We report on the design, implementation and characterization of a multi-graphic processing unit (GPU) computational platform for higher-order optimization in radiotherapy treatment planning. In collaboration with a commercial vendor (Varian Medical Systems, Palo Alto, CA), a research prototype GPU-enabled Eclipse (V13.6) workstation was configured. The hardware consisted of dual 8-core Xeon processors, 256 GB RAM and four NVIDIA Tesla K80 general purpose GPUs. We demonstrate the utility of this platform for large radiotherapy optimization problems through the development and characterization of a parallelized particle swarm optimization (PSO) four dimensional (4D) intensity modulated radiation therapy (IMRT) technique. The PSO engine was coupled to the Eclipse treatment planning system via a vendor-provided scripting interface. Specific challenges addressed in this implementation were (i) data management and (ii) non-uniform memory access (NUMA). For the former, we alternated between parameters over which the computation process was parallelized. For the latter, we reduced the amount of data required to be transferred over the NUMA bridge. The datasets examined in this study were approximately 300 GB in size, including 4D computed tomography images, anatomical structure contours and dose deposition matrices. For evaluation, we created a 4D-IMRT treatment plan for one lung cancer patient and analyzed computation speed while varying several parameters (number of respiratory phases, GPUs, PSO particles, and data matrix sizes). The optimized 4D-IMRT plan enhanced sparing of organs at risk by an average reduction of [Formula: see text] in maximum dose, compared to the clinical optimized IMRT plan, where the internal target volume was used. We validated our computation time analyses in two additional cases. The computation speed in our implementation did not monotonically increase with the number of GPUs. The optimal number of GPUs (five, in our study) is directly related to the hardware specifications. The optimization process took 35 min using 50 PSO particles, 25 iterations and 5 GPUs.

  3. Execution of the Spitzer In-orbit Checkout and Science Verification Plan

    NASA Technical Reports Server (NTRS)

    Miles, John W.; Linick, Susan H.; Long, Stacia; Gilbert, John; Garcia, Mark; Boyles, Carole; Werner, Michael; Wilson, Robert K.

    2004-01-01

    The Spitzer Space Telescope is an 85-cm telescope with three cryogenically cooled instruments. Following launch, the observatory was initialized and commissioned for science operations during the in-orbit checkout (IOC) and science verification (SV) phases, carried out over a total of 98.3 days. The execution of the IOC/SV mission plan progressively established Spitzer capabilities taking into consideration thermal, cryogenic, optical, pointing, communications, and operational designs and constraints. The plan was carried out with high efficiency, making effective use of cryogen-limited flight time. One key component to the success of the plan was the pre-launch allocation of schedule reserve in the timeline of IOC/SV activities, and how it was used in flight both to cover activity redesign and growth due to continually improving spacecraft and instrument knowledge, and to recover from anomalies. This paper describes the adaptive system design and evolution, implementation, and lessons learned from IOC/SV operations. It is hoped that this information will provide guidance to future missions with similar engineering challenges

  4. Project management plan for asbestos control at Randolph Air Force Base

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Broers, G.J.

    1988-02-01

    The United States Air Force Air Training Command (ATC) Headquarters requested assistance from the Idaho National Engineering Laboratory (INEL) in February, 1987 to develop processes and procedures and provide program management to minimize and control asbestos hazard at its thirteen bases. This effort was requested by the ATC to comply with Executive Order 12088 under which the USAF is directed to meet all applicable federal, state, and local environmental regulations. In response to that request the efforts identified within this document provide the ATC with a thorough base-wide Asbestos Survey Report, an Asbestos Management Plan and an Operations and Maintenancemore » Plan for Randolph AFB which, when implemented, will comply with current and anticipated federal laws and provide the base with accurate information needed for long range asbestos management. The other twelve bases will be surveyed and sampled in the four years to follow with appropriate asbestos management plans developed for each. 6 figs.« less

  5. Accelerated testing of space mechanisms

    NASA Technical Reports Server (NTRS)

    Murray, S. Frank; Heshmat, Hooshang

    1995-01-01

    This report contains a review of various existing life prediction techniques used for a wide range of space mechanisms. Life prediction techniques utilized in other non-space fields such as turbine engine design are also reviewed for applicability to many space mechanism issues. The development of new concepts on how various tribological processes are involved in the life of the complex mechanisms used for space applications are examined. A 'roadmap' for the complete implementation of a tribological prediction approach for complex mechanical systems including standard procedures for test planning, analytical models for life prediction and experimental verification of the life prediction and accelerated testing techniques are discussed. A plan is presented to demonstrate a method for predicting the life and/or performance of a selected space mechanism mechanical component.

  6. Aerospace Systems Design in NASA's Collaborative Engineering Environment

    NASA Technical Reports Server (NTRS)

    Monell, Donald W.; Piland, William M.

    2000-01-01

    Past designs of complex aerospace systems involved an environment consisting of collocated design teams with project managers, technical discipline experts, and other experts (e.g., manufacturing and systems operation). These experts were generally qualified only on the basis of past design experience and typically had access to a limited set of integrated analysis tools. These environments provided less than desirable design fidelity, often lead to the inability of assessing critical programmatic and technical issues (e.g., cost, risk, technical impacts), and generally derived a design that was not necessarily optimized across the entire system. The continually changing, modern aerospace industry demands systems design processes that involve the best talent available (no matter where it resides) and access to the the best design and analysis tools. A solution to these demands involves a design environment referred to as collaborative engineering. The collaborative engineering environment evolving within the National Aeronautics and Space Administration (NASA) is a capability that enables the Agency's engineering infrastructure to interact and use the best state-of-the-art tools and data across organizational boundaries. Using collaborative engineering, the collocated team is replaced with an interactive team structure where the team members are geographical distributed and the best engineering talent can be applied to the design effort regardless of physical location. In addition, a more efficient, higher quality design product is delivered by bringing together the best engineering talent with more up-to-date design and analysis tools. These tools are focused on interactive, multidisciplinary design and analysis with emphasis on the complete life cycle of the system, and they include nontraditional, integrated tools for life cycle cost estimation and risk assessment. NASA has made substantial progress during the last two years in developing a collaborative engineering environment. NASA is planning to use this collaborative engineering engineering infrastructure to provide better aerospace systems life cycle design and analysis, which includes analytical assessment of the technical and programmatic aspects of a system from "cradle to grave." This paper describes the recent NASA developments in the area of collaborative engineering, the benefits (realized and anticipated) of using the developed capability, and the long-term plans for implementing this capability across Agency.

  7. An approach to knowledge engineering to support knowledge-based simulation of payload ground processing at the Kennedy Space Center

    NASA Technical Reports Server (NTRS)

    Mcmanus, Shawn; Mcdaniel, Michael

    1989-01-01

    Planning for processing payloads was always difficult and time-consuming. With the advent of Space Station Freedom and its capability to support a myriad of complex payloads, the planning to support this ground processing maze involves thousands of man-hours of often tedious data manipulation. To provide the capability to analyze various processing schedules, an object oriented knowledge-based simulation environment called the Advanced Generic Accomodations Planning Environment (AGAPE) is being developed. Having nearly completed the baseline system, the emphasis in this paper is directed toward rule definition and its relation to model development and simulation. The focus is specifically on the methodologies implemented during knowledge acquisition, analysis, and representation within the AGAPE rule structure. A model is provided to illustrate the concepts presented. The approach demonstrates a framework for AGAPE rule development to assist expert system development.

  8. eHealth and IMIA's Strategic Planning Process - IMIA conference introductory address.

    PubMed

    Murray, Peter; Haux, Reinhold; Lorenzi, Nancy

    2008-01-01

    The International Medical Informatics Association (IMIA) is the only organization in health and biomedical informatics which is fully international in scope, bridging the academic, health practice, education, and health industry worlds through conferences, working groups, special interest groups and publications. Authored by the IMIA Interim Vice President for Strategic Planning Implementation and co-authored by the current IMIA President and the IMIA Past-President, the intention of this paper is to introduce IMIA's current strategic planning process and to set this process in relation to 'eHealth: Combining Health Telematics, Telemedicine, Biomedical Engineering and Bioinformatics to the Edge', the theme of this conference. From the viewpoint of an international organization such as IMIA, an eHealth strategy needs to be considered in a comprehensive way, including broadly stimulating high-quality health and biomedical informatics research and education, as well as providing support to bridging outcomes towards a new practice of health care in a changing world.

  9. An assigned responsibility system for robotic teleoperation control.

    PubMed

    Small, Nicolas; Lee, Kevin; Mann, Graham

    2018-01-01

    This paper proposes an architecture that explores a gap in the spectrum of existing strategies for robot control mode switching in adjustable autonomy. In situations where the environment is reasonably known and/or predictable, pre-planning these control changes could relieve robot operators of the additional task of deciding when and how to switch. Such a strategy provides a clear division of labour between the automation and the human operator(s) before the job even begins, allowing for individual responsibilities to be known ahead of time, limiting confusion and allowing rest breaks to be planned. Assigned Responsibility is a new form of adjustable autonomy-based teleoperation that allows the selective inclusion of automated control elements at key stages of a robot operation plan's execution. Progression through these stages is controlled by automatic goal accomplishment tracking. An implementation is evaluated through engineering tests and a usability study, demonstrating the viability of this approach and offering insight into its potential applications.

  10. Decommissioning strategy for liquid low-level radioactive waste surface storage water reservoir.

    PubMed

    Utkin, S S; Linge, I I

    2016-11-22

    The Techa Cascade of water reservoirs (TCR) is one of the most environmentally challenging facilities resulted from FSUE "PA "Mayak" operations. Its reservoirs hold over 360 mln m 3 of liquid radioactive waste with a total activity of some 5 × 10 15 Bq. A set of actions implemented under a special State program involving the development of a strategic plan aimed at complete elimination of TCR challenges (Strategic Master-Plan for the Techa Cascade of water reservoirs) resulted in considerable reduction of potential hazards associated with this facility. The paper summarizes the key elements of this master-plan: defining TCR final state, feasibility study of the main strategies aimed at its attainment, evaluation of relevant long-term decommissioning strategy, development of computational tools enabling the long-term forecast of TCR behavior depending on various engineering solutions and different weather conditions. Copyright © 2016 Elsevier Ltd. All rights reserved.

  11. Applications of tethers in space: A review of workshop recommendations

    NASA Technical Reports Server (NTRS)

    Vontiesenhausen, G. (Editor)

    1986-01-01

    Well-organized and structured efforts of considerable magnitude involving NASA, industry, and academia have explored and defined the engineering and technological requirements of the use of tethers in space and have discovered their broad range of operational and economic benefits. The results of these efforts have produced a family of extremely promising candidate applications. The extensive efforts now in progress are gaining momentum and a series of flight demonstrations are being planned and can be expected to take place in a few years. This report provides an analysis and a review of NASA's second major workshop on Applications of Tethers in Space held in October 15 to 17, 1985, in Venice, Italy. It provides a summary of an up-to-date assessment and recommendations by the NASA Tether Applications in Space Program Planning Group, consisting of representatives of seven NASA Centers and responsible for tether applications program planning implementation as recommended by the workshop panels.

  12. Towards automatic planning for manufacturing generative processes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    CALTON,TERRI L.

    2000-05-24

    Generative process planning describes methods process engineers use to modify manufacturing/process plans after designs are complete. A completed design may be the result from the introduction of a new product based on an old design, an assembly upgrade, or modified product designs used for a family of similar products. An engineer designs an assembly and then creates plans capturing manufacturing processes, including assembly sequences, component joining methods, part costs, labor costs, etc. When new products originate as a result of an upgrade, component geometry may change, and/or additional components and subassemblies may be added to or are omitted from themore » original design. As a result process engineers are forced to create new plans. This is further complicated by the fact that the process engineer is forced to manually generate these plans for each product upgrade. To generate new assembly plans for product upgrades, engineers must manually re-specify the manufacturing plan selection criteria and re-run the planners. To remedy this problem, special-purpose assembly planning algorithms have been developed to automatically recognize design modifications and automatically apply previously defined manufacturing plan selection criteria and constraints.« less

  13. Feasibility study for early removal of HEU from CPP-651-Phase II

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith, C.V.; Henry, R.; Milligan, C.

    1997-09-01

    A two-phase feasibility study was initiated in late 1996 to identify a way to expedite the removal of SNM from the CPP-651 vault. The first phase of this study provided preliminary information that appeared promising, but needed additional detailed planning and evaluate to validate the concepts and conclusions. The focus of Phase 2 was to provide the validation via resource-loaded schedules and more detailed cost estimates. Section 1 describes the purpose and objectives of the Phase 2 tasks and the programmatic drivers that influence related CPP-651 high-enriched uranium (HEU) management issues. Section 2 identifies the evaluation criteria and methodology andmore » the transfer issues and barriers preventing shipment. Section 3 provides site-specific background information for the CPP-651 facility and the Idaho National Engineering and Environmental Laboratory (INEEL) and describes the development of the basic material removal schedule, the proposed base case plan for removal of SNM, and the proposed HEU material management/shipping issues and strategies. Section 4 identifies the proposed options for accelerated removal of SNM and how they were evaluated via detailed scheduling, resource histograms, and cost analysis. Section 5 summarizes principal tasks for implementing this plan and other related HEU CPP-651 management issues that require continued planning efforts to assure successful implementation of this proposed early removal strategy.« less

  14. Overview of Carbon Dioxide Control Issues During International Space Station/Space Shuttle Joint Docked Operations

    NASA Technical Reports Server (NTRS)

    Matty, Christopher M.

    2010-01-01

    Crewed space vehicles have a common requirement to remove the carbon dioxide (CO2) created by the metabolic processes of the crew. The space shuttle [Space Transportation System (STS)] and International Space Station (ISS) each have systems in place that allow control and removal of CO2 from the habitable cabin environment. During periods in which the space shuttle is docked to the ISS, known as "joint docked operations," the space shuttle and ISS share a common atmosphere environment. During this period, an elevated amount of CO2 is produced through the combined metabolic activity of the STS and ISS crews. This elevated CO2 production, together with the large effective atmosphere created by collective volumes of the docked vehicles, creates a unique set of requirements for CO2 removal. This paper will describe individual CO2 control plans implemented by STS and ISS engineering teams, as well as the integrated plans used when both vehicles are docked. The paper will also discuss some of the issues and anomalies experienced by both engineering teams.

  15. Overview of Carbon Dioxide Control Issues During International Space Station/Space Shuttle Joint Docked Operations

    NASA Technical Reports Server (NTRS)

    Matty, Christopher M.; Hayley, Elizabeth P.

    2009-01-01

    Manned space vehicles have a common requirement to remove the Carbon Dioxide (CO2) created by the metabolic processes of the crew. The Space Shuttle and International Space Station (ISS) each have systems in place to allow control and removal of CO2 from the habitable cabin environment. During periods where the Space Shuttle is docked to ISS, known as joint docked operations, the Space Shuttle and ISS share a common atmosphere environment. During this period there is an elevated production of CO2 caused by the combined metabolic activity of the Space Shuttle and ISS crew. This elevated CO2 production, combined with the large effective atmosphere created by the collective volumes of the docked vehicles, creates a unique set of requirements for CO2 removal. This paper will describe the individual CO2 control plans implemented by the Space Shuttle and ISS engineering teams, as well as the integrated plans used when both vehicles are docked. In addition, the paper will discuss some of the issues and anomalies experienced by both engineering teams.

  16. Environmental Release Prevention and Control Plan (ERP and CP) annual review and update for 1993

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jannik, G.T.; Mamatey, A.; Arnett, M.

    1993-10-05

    In the Environmental Release Prevention and Control Plan (ERP and CP), WSRC made a commitment to conduct the following follow-up activities and actions: (1) Complete the action items developed in response to the findings and recommendation of the Environmental Release Prevention Taskteam (WSRC-RP-92-356). (2) Complete all batch and continuous release procedure revisions to incorporate the attributes that WSRC senior management required of each procedure. (3) DOE-SR Assistance Managers and WSRC counterparts to reach consensus and closure on the identified engineered solutions documented in the ERP and CP, develop and drive implementation of facility changes per the agreements. (4) Continue tomore » analyze releases and monitor performance in accordance with the ERP and CP, and utilize the ALARA Release Guides Committee to drive improvements. (5) Conduct annual re-evaluations of the cost benefit analyses of the identified engineered solutions, and identify new options and alternatives for each outfall in response to site mission and facility changes. This report documents the efforts that have been completed over the past year in response to these commitments.« less

  17. 77 FR 43205 - Notice of Data Availability for Approval, Disapproval and Promulgation of Implementation Plans...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-24

    ... Haze State Implementation Plan; Federal Implementation Plan for Regional Haze AGENCY: Environmental... (SIP) revision submitted by the State of Wyoming on January 12, 2011, that addresses regional haze...; Regional Haze State Implementation Plan; Federal Implementation Plan for Regional Haze; Proposed Rule (77...

  18. 78 FR 28775 - Approval and Promulgation of Implementation Plans; North Carolina; State Implementation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ... Promulgation of Implementation Plans; North Carolina; State Implementation Plan Miscellaneous Revisions AGENCY... a revision to the North Carolina State Implementation Plan submitted on February 3, 2010, through... particulate matter found in the Code of Federal Regulations. In the Final Rules Section of this Federal...

  19. Full Monte Carlo-Based Biologic Treatment Plan Optimization System for Intensity Modulated Carbon Ion Therapy on Graphics Processing Unit.

    PubMed

    Qin, Nan; Shen, Chenyang; Tsai, Min-Yu; Pinto, Marco; Tian, Zhen; Dedes, Georgios; Pompos, Arnold; Jiang, Steve B; Parodi, Katia; Jia, Xun

    2018-01-01

    One of the major benefits of carbon ion therapy is enhanced biological effectiveness at the Bragg peak region. For intensity modulated carbon ion therapy (IMCT), it is desirable to use Monte Carlo (MC) methods to compute the properties of each pencil beam spot for treatment planning, because of their accuracy in modeling physics processes and estimating biological effects. We previously developed goCMC, a graphics processing unit (GPU)-oriented MC engine for carbon ion therapy. The purpose of the present study was to build a biological treatment plan optimization system using goCMC. The repair-misrepair-fixation model was implemented to compute the spatial distribution of linear-quadratic model parameters for each spot. A treatment plan optimization module was developed to minimize the difference between the prescribed and actual biological effect. We used a gradient-based algorithm to solve the optimization problem. The system was embedded in the Varian Eclipse treatment planning system under a client-server architecture to achieve a user-friendly planning environment. We tested the system with a 1-dimensional homogeneous water case and 3 3-dimensional patient cases. Our system generated treatment plans with biological spread-out Bragg peaks covering the targeted regions and sparing critical structures. Using 4 NVidia GTX 1080 GPUs, the total computation time, including spot simulation, optimization, and final dose calculation, was 0.6 hour for the prostate case (8282 spots), 0.2 hour for the pancreas case (3795 spots), and 0.3 hour for the brain case (6724 spots). The computation time was dominated by MC spot simulation. We built a biological treatment plan optimization system for IMCT that performs simulations using a fast MC engine, goCMC. To the best of our knowledge, this is the first time that full MC-based IMCT inverse planning has been achieved in a clinically viable time frame. Copyright © 2017 Elsevier Inc. All rights reserved.

  20. Manufacturing Methods and Technology Program Plan. Update.

    DTIC Science & Technology

    1981-11-01

    INDUSTRIAL BASE ENGINEERING ACTIVITY ROCK ISLAND. ILLINOIS 61299 82 INDEX PAGE I. INTRODUCTION The MMT Program Plan Update ........... 1 Industry Guide...obtained from that Plan, extra copies of which are available upon request from the Industrial Base Engineering Activity. Other sources for this data are...Major Subcommands (SUBMACOM’S). The SUBMACOM’S plan, formulate, budget, and execute individual projects. The Industrial Base Engineering Activity

  1. Applying CPR to a gas utility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lowe, R.

    1995-12-31

    The latest management tool to hit the United States over the past five years is Core Process Re-engineering (CPR). Though not as radical a procedure as the well-known rescue method it shares an abbreviation with, it is viewed as the radical thinking of a business process. CPR has helped breathe new life into gas and electric utilities in recent years, which have been using it to find ways to increase customer satisfaction, decrease operating costs, reduce process time and/or increase quality. The first phase of a typical project identifies and reviews current processes and obtains information that can point outmore » re-engineering opportunities. The second phase involves the actual redesign of the current process. In this phase new teams may be formed, since the skill requirements are different (creative thinking becomes very important, for instance). Once alternatives are finalized and approved, the actual change process begins. Implementing all the recommendations can take several years, primarily because of labor and regulatory implications; therefore, planning the implementation is the most important part of the project. First, develop an overall implementation strategy. This overall strategy should address four major questions: What to implement? Who will implement? When to implement? How to implement? CPR is not an automatic solution to a problem. Any company wanting to expedite a CPR effort should consider the following factors: Align the CPR objectives to the overall company objectives; Ensure that senior management is actively involved and supports the CPR activities; Select the right team of people and ensure they are committed to the project; Develop a case for change and instill a sense of urgency in all the stakeholders; Focus on business results and not on specific activities; and Communicate, communicate, communicate.« less

  2. Space Technology 5: Changing the Mission Design without Changing the Hardware

    NASA Technical Reports Server (NTRS)

    Carlisle, Candace C.; Webb, Evan H.; Slavin, James A.

    2005-01-01

    The Space Technology 5 (ST-5) Project is part of NASA's New Millennium Program. The validation objectives are to demonstrate the research-quality science capability of the ST-5 spacecraft; to operate the three spacecraft as a constellation; and to design, develop, test and flight-validate three capable micro-satellites with new technologies. A three-month flight demonstration phase is planned, beginning in March 2006. This year, the mission was re-planned for a Pegasus XL dedicated launch into an elliptical polar orbit (instead of the Originally-planned Geosynchronous Transfer Orbit.) The re-plan allows the mission to achieve the same high-level technology validation objectives with a different launch vehicle. The new mission design involves a revised science validation strategy, a new orbit and different communication strategy, while minimizing changes to the ST-5 spacecraft itself. The constellation operations concepts have also been refined. While the system engineers, orbit analysts, and operations teams were re-planning the mission, the implementation team continued to make progress on the flight hardware. Most components have been delivered, and the first spacecraft is well into integration and test.

  3. Using SysML for verification and validation planning on the Large Synoptic Survey Telescope (LSST)

    NASA Astrophysics Data System (ADS)

    Selvy, Brian M.; Claver, Charles; Angeli, George

    2014-08-01

    This paper provides an overview of the tool, language, and methodology used for Verification and Validation Planning on the Large Synoptic Survey Telescope (LSST) Project. LSST has implemented a Model Based Systems Engineering (MBSE) approach as a means of defining all systems engineering planning and definition activities that have historically been captured in paper documents. Specifically, LSST has adopted the Systems Modeling Language (SysML) standard and is utilizing a software tool called Enterprise Architect, developed by Sparx Systems. Much of the historical use of SysML has focused on the early phases of the project life cycle. Our approach is to extend the advantages of MBSE into later stages of the construction project. This paper details the methodology employed to use the tool to document the verification planning phases, including the extension of the language to accommodate the project's needs. The process includes defining the Verification Plan for each requirement, which in turn consists of a Verification Requirement, Success Criteria, Verification Method(s), Verification Level, and Verification Owner. Each Verification Method for each Requirement is defined as a Verification Activity and mapped into Verification Events, which are collections of activities that can be executed concurrently in an efficient and complementary way. Verification Event dependency and sequences are modeled using Activity Diagrams. The methodology employed also ties in to the Project Management Control System (PMCS), which utilizes Primavera P6 software, mapping each Verification Activity as a step in a planned activity. This approach leads to full traceability from initial Requirement to scheduled, costed, and resource loaded PMCS task-based activities, ensuring all requirements will be verified.

  4. POLARIS: Agent-based modeling framework development and implementation for integrated travel demand and network and operations simulations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Auld, Joshua; Hope, Michael; Ley, Hubert

    This paper discusses the development of an agent-based modelling software development kit, and the implementation and validation of a model using it that integrates dynamic simulation of travel demand, network supply and network operations. A description is given of the core utilities in the kit: a parallel discrete event engine, interprocess exchange engine, and memory allocator, as well as a number of ancillary utilities: visualization library, database IO library, and scenario manager. The overall framework emphasizes the design goals of: generality, code agility, and high performance. This framework allows the modeling of several aspects of transportation system that are typicallymore » done with separate stand-alone software applications, in a high-performance and extensible manner. The issue of integrating such models as dynamic traffic assignment and disaggregate demand models has been a long standing issue for transportation modelers. The integrated approach shows a possible way to resolve this difficulty. The simulation model built from the POLARIS framework is a single, shared-memory process for handling all aspects of the integrated urban simulation. The resulting gains in computational efficiency and performance allow planning models to be extended to include previously separate aspects of the urban system, enhancing the utility of such models from the planning perspective. Initial tests with case studies involving traffic management center impacts on various network events such as accidents, congestion and weather events, show the potential of the system.« less

  5. HSI in NASA: From Research to Implementation

    NASA Technical Reports Server (NTRS)

    Whitmore, Mihriban; Plaga, John A.

    2016-01-01

    As NASA plans to send human explorers beyond low Earth orbit, onward to Mars and other destinations in the solar system, there will be new challenges to address in terms of HSI. These exploration missions will be quite different from the current and past missions such as Apollo, Shuttle, and International Space Station. The exploration crew will be more autonomous from ground mission control with delayed, and at times, no communication. They will have limited to no resupply for much longer mission durations. Systems to deliver and support extended human habitation at these destinations are extremely complex and unique, presenting new opportunities to employ HSI practices. In order to have an effective and affordable HSI implementation, both research and programmatic efforts are required. Currently, the HSI-related research at NASA is primarily in the area of space human factors and habitability. The purpose is to provide human health and performance countermeasures, knowledge, technologies, and tools to enable safe, reliable, and productive human space exploration beyond low Earth orbit, and update standards, requirements, and processes to verify and validate these requirements. In addition, HSI teams are actively engaged in technology development and demonstration efforts to influence the mission architecture and next-generation vehicle design. Finally, appropriate HSI references have been added to NASA' s systems engineering documentation, and an HSI Practitioner's Guide has been published to help design engineers consider HSI early and continuously in the acquisition process. These current and planned HSI-related activities at NASA will be discussed in this panel.

  6. Approved Air Quality Implementation Plans in Region 10

    EPA Pesticide Factsheets

    Landing page for information about EPA-approved air quality State Implementation Plans (SIPs), Tribal Implementation Plans (TIPs), and Federal Implementation Plans (FIPs) in Alaska, Idaho, Oregon, Washington.

  7. 78 FR 69625 - Approval and Promulgation of Implementation Plans; New York State Ozone Implementation Plan Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-20

    ...] Approval and Promulgation of Implementation Plans; New York State Ozone Implementation Plan Revision AGENCY...) is proposing to approve a revision to the New York State Implementation Plan (SIP) for ozone... air quality standards for ozone. DATES: Comments must be received on or before December 20, 2013...

  8. 77 FR 13974 - Approval and Promulgation of Implementation Plans; New York State Ozone Implementation Plan Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-08

    ... Promulgation of Implementation Plans; New York State Ozone Implementation Plan Revision AGENCY: Environmental... a proposed revision to the New York State Implementation Plan (SIP) for ozone concerning the control... national ambient air quality standards for ozone. DATES: Effective Date: This rule will be effective April...

  9. The Keller Plan: A Successful Experiment in Engineering Education.

    ERIC Educational Resources Information Center

    Koen, Billy; And Others

    1985-01-01

    Discusses the Keller Plan or personalized system of instruction (PSI), a mastery-oriented, self-paced, modular teaching strategy using student/peer proctors. Success for PSI in chemical engineering, operations research, electrical engineering, and nuclear engineering courses is explained. (DH)

  10. Formulation of a parametric systems design framework for disaster response planning

    NASA Astrophysics Data System (ADS)

    Mma, Stephanie Weiya

    The occurrence of devastating natural disasters in the past several years have prompted communities, responding organizations, and governments to seek ways to improve disaster preparedness capabilities locally, regionally, nationally, and internationally. A holistic approach to design used in the aerospace and industrial engineering fields enables efficient allocation of resources through applied parametric changes within a particular design to improve performance metrics to selected standards. In this research, this methodology is applied to disaster preparedness, using a community's time to restoration after a disaster as the response metric. A review of the responses from Hurricane Katrina and the 2010 Haiti earthquake, among other prominent disasters, provides observations leading to some current capability benchmarking. A need for holistic assessment and planning exists for communities but the current response planning infrastructure lacks a standardized framework and standardized assessment metrics. Within the humanitarian logistics community, several different metrics exist, enabling quantification and measurement of a particular area's vulnerability. These metrics, combined with design and planning methodologies from related fields, such as engineering product design, military response planning, and business process redesign, provide insight and a framework from which to begin developing a methodology to enable holistic disaster response planning. The developed methodology was applied to the communities of Shelby County, TN and pre-Hurricane-Katrina Orleans Parish, LA. Available literature and reliable media sources provide information about the different values of system parameters within the decomposition of the community aspects and also about relationships among the parameters. The community was modeled as a system dynamics model and was tested in the implementation of two, five, and ten year improvement plans for Preparedness, Response, and Development capabilities, and combinations of these capabilities. For Shelby County and for Orleans Parish, the Response improvement plan reduced restoration time the most. For the combined capabilities, Shelby County experienced the greatest reduction in restoration time with the implementation of Development and Response capability improvements, and for Orleans Parish it was the Preparedness and Response capability improvements. Optimization of restoration time with community parameters was tested by using a Particle Swarm Optimization algorithm. Fifty different optimized restoration times were generated using the Particle Swarm Optimization algorithm and ranked using the Technique for Order Preference by Similarity to Ideal Solution. The optimization results indicate that the greatest reduction in restoration time for a community is achieved with a particular combination of different parameter values instead of the maximization of each parameter.

  11. IDC Integrated Master Plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clifford, David J.; Harris, James M.

    2014-12-01

    This is the IDC Re-Engineering Phase 2 project Integrated Master Plan (IMP). The IMP presents the major accomplishments planned over time to re-engineer the IDC system. The IMP and the associate Integrated Master Schedule (IMS) are used for planning, scheduling, executing, and tracking the project technical work efforts. REVISIONS Version Date Author/Team Revision Description Authorized by V1.0 12/2014 IDC Re- engineering Project Team Initial delivery M. Harris

  12. Implementation of an innovative teaching project in a Chemical Process Design course at the University of Cantabria, Spain

    NASA Astrophysics Data System (ADS)

    Galan, Berta; Muñoz, Iciar; Viguri, Javier R.

    2016-09-01

    This paper shows the planning, the teaching activities and the evaluation of the learning and teaching process implemented in the Chemical Process Design course at the University of Cantabria, Spain. Educational methods to address the knowledge, skills and attitudes that students who complete the course are expected to acquire are proposed and discussed. Undergraduate and graduate engineers' perceptions of the methodology used are evaluated by means of a questionnaire. Results of the teaching activities and the strengths and weaknesses of the proposed case study are discussed in relation to the course characteristics. The findings of the empirical evaluation shows that the excessive time students had to dedicate to the case study project and dealing with limited information are the most negative aspects obtained, whereas an increase in the students' self-confidence and the practical application of the methodology are the most positive aspects. Finally, improvements are discussed in order to extend the application of the methodology to other courses offered as part of the chemical engineering degree.

  13. Integration of Mahalanobis-Taguchi system and traditional cost accounting for remanufacturing crankshaft

    NASA Astrophysics Data System (ADS)

    Abu, M. Y.; Norizan, N. S.; Rahman, M. S. Abd

    2018-04-01

    Remanufacturing is a sustainability strategic planning which transforming the end of life product to as new performance with their warranty is same or better than the original product. In order to quantify the advantages of this strategy, all the processes must implement the optimization to reach the ultimate goal and reduce the waste generated. The aim of this work is to evaluate the criticality of parameters on the end of life crankshaft based on Taguchi’s orthogonal array. Then, estimate the cost using traditional cost accounting by considering the critical parameters. By implementing the optimization, the remanufacturer obviously produced lower cost and waste during production with higher potential to gain the profit. Mahalanobis-Taguchi System was proven as a powerful method of optimization that revealed the criticality of parameters. When subjected the method to the MAN engine model, there was 5 out of 6 crankpins were critical which need for grinding process while no changes happened to the Caterpillar engine model. Meanwhile, the cost per unit for MAN engine model was changed from MYR1401.29 to RM1251.29 while for Caterpillar engine model have no changes due to the no changes on criticality of parameters consideration. Therefore, by integrating the optimization and costing through remanufacturing process, a better decision can be achieved after observing the potential profit will be gained. The significant of output demonstrated through promoting sustainability by reducing re-melting process of damaged parts to ensure consistent benefit of return cores.

  14. Transient simulation of coolant peak temperature due to prolonged fan and/or water pump operation after the vehicle is keyed-off

    NASA Astrophysics Data System (ADS)

    Pang, Suh Chyn; Masjuki, Haji Hassan; Kalam, Md. Abul; Hazrat, Md. Ali

    2014-01-01

    Automotive designers should design a robust engine cooling system which works well in both normal and severe driving conditions. When vehicles are keyed-off suddenly after some distance of hill-climbing driving, the coolant temperature tends to increase drastically. This is because heat soak in the engine could not be transferred away in a timely manner, as both the water pump and cooling fan stop working after the vehicle is keyed-off. In this research, we aimed to visualize the coolant temperature trend over time before and after the vehicles were keyed-off. In order to prevent coolant temperature from exceeding its boiling point and jeopardizing engine life, a numerical model was further tested with prolonged fan and/or water pump operation after keying-off. One dimensional thermal-fluid simulation was exploited to model the vehicle's cooling system. The behaviour of engine heat, air flow, and coolant flow over time were varied to observe the corresponding transient coolant temperatures. The robustness of this model was proven by validation with industry field test data. The numerical results provided sensible insights into the proposed solution. In short, prolonging fan operation for 500 s and prolonging both fan and water pump operation for 300 s could reduce coolant peak temperature efficiently. The physical implementation plan and benefits yielded from implementation of the electrical fan and electrical water pump are discussed.

  15. Microstructure Modeling of 3rd Generation Disk Alloys

    NASA Technical Reports Server (NTRS)

    Jou, Herng-Jeng

    2010-01-01

    The objective of this program is to model, validate, and predict the precipitation microstructure evolution, using PrecipiCalc (QuesTek Innovations LLC) software, for 3rd generation Ni-based gas turbine disc superalloys during processing and service, with a set of logical and consistent experiments and characterizations. Furthermore, within this program, the originally research-oriented microstructure simulation tool will be further improved and implemented to be a useful and user-friendly engineering tool. In this report, the key accomplishment achieved during the second year (2008) of the program is summarized. The activities of this year include final selection of multicomponent thermodynamics and mobility databases, precipitate surface energy determination from nucleation experiment, multiscale comparison of predicted versus measured intragrain precipitation microstructure in quench samples showing good agreement, isothermal coarsening experiment and interaction of grain boundary and intergrain precipitates, primary microstructure of subsolvus treatment, and finally the software implementation plan for the third year of the project. In the following year, the calibrated models and simulation tools will be validated against an independently developed experimental data set, with actual disc heat treatment process conditions. Furthermore, software integration and implementation will be developed to provide material engineers valuable information in order to optimize the processing of the 3rd generation gas turbine disc alloys.

  16. Two implementations of the Expert System for the Flight Analysis System (ESFAS) project

    NASA Technical Reports Server (NTRS)

    Wang, Lui

    1988-01-01

    A comparison is made between the two most sophisticated expert system building tools, the Automated Reasoning Tool (ART) and the Knowledge Engineering Environment (KEE). The same problem domain (ESFAS) was used in making the comparison. The Expert System for the Flight Analysis System (ESFAS) acts as an intelligent front end for the Flight Analysis System (FAS). FAS is a complex configuration controlled set of interrelated processors (FORTRAN routines) which will be used by the Mission Planning and Analysis Div. (MPAD) to design and analyze Shuttle and potential Space Station missions. Implementations of ESFAS are described. The two versions represent very different programming paradigms; ART uses rules and KEE uses objects. Due to each of the tools philosophical differences, KEE is implemented using a depth first traversal algorithm, whereas ART uses a user directed traversal method. Either tool could be used to solve this particular problem.

  17. Aerospace Systems Design in NASA's Collaborative Engineering Environment

    NASA Technical Reports Server (NTRS)

    Monell, Donald W.; Piland, William M.

    1999-01-01

    Past designs of complex aerospace systems involved an environment consisting of collocated design teams with project managers, technical discipline experts, and other experts (e.g. manufacturing and systems operations). These experts were generally qualified only on the basis of past design experience and typically had access to a limited set of integrated analysis tools. These environments provided less than desirable design fidelity, often lead to the inability of assessing critical programmatic and technical issues (e.g., cost risk, technical impacts), and generally derived a design that was not necessarily optimized across the entire system. The continually changing, modern aerospace industry demands systems design processes that involve the best talent available (no matter where it resides) and access to the best design and analysis tools. A solution to these demands involves a design environment referred to as collaborative engineering. The collaborative engineering environment evolving within the National Aeronautics and Space Administration (NASA) is a capability that enables the Agency's engineering infrastructure to interact and use the best state-of-the-art tools and data across organizational boundaries. Using collaborative engineering, the collocated team is replaced with an interactive team structure where the team members are geographically distributed and the best engineering talent can be applied to the design effort regardless of physical location. In addition, a more efficient, higher quality design product is delivered by bringing together the best engineering talent with more up-to-date design and analysis tools. These tools are focused on interactive, multidisciplinary design and analysis with emphasis on the complete life cycle of the system, and they include nontraditional, integrated tools for life cycle cost estimation and risk assessment. NASA has made substantial progress during the last two years in developing a collaborative engineering environment. NASA is planning to use this collaborative engineering infrastructure to provide better aerospace systems life cycle design and analysis, which includes analytical assessment of the technical and programmatic aspects of a system from "cradle to grave." This paper describes the recent NASA developments in the area of collaborative engineering, the benefits (realized and anticipated) of using the developed capability, and the long-term plans for implementing this capability across the Agency.

  18. Aerospace Systems Design in NASA's Collaborative Engineering Environment

    NASA Astrophysics Data System (ADS)

    Monell, Donald W.; Piland, William M.

    2000-07-01

    Past designs of complex aerospace systems involved an environment consisting of collocated design teams with project managers, technical discipline experts, and other experts (e.g., manufacturing and systems operations). These experts were generally qualified only on the basis of past design experience and typically had access to a limited set of integrated analysis tools. These environments provided less than desirable design fidelity, often led to the inability of assessing critical programmatic and technical issues (e.g., cost, risk, technical impacts), and generally derived a design that was not necessarily optimized across the entire system. The continually changing, modern aerospace industry demands systems design processes that involve the best talent available (no matter where it resides) and access to the best design and analysis tools. A solution to these demands involves a design environment referred to as collaborative engineering. The collaborative engineering environment evolving within the National Aeronautics and Space Administration (NASA) is a capability that enables the Agency's engineering infrastructure to interact and use the best state-of-the-art tools and data across organizational boundaries. Using collaborative engineering, the collocated team is replaced with an interactive team structure where the team members are geographically distributed and the best engineering talent can be applied to the design effort regardless of physical location. In addition, a more efficient, higher quality design product is delivered by bringing together the best engineering talent with more up-to-date design and analysis tools. These tools are focused on interactive, multidisciplinary design and analysis with emphasis on the complete life cycle of the system, and they include nontraditional, integrated tools for life cycle cost estimation and risk assessment. NASA has made substantial progress during the last two years in developing a collaborative engineering environment. NASA is planning to use this collaborative engineering infrastructure to provide better aerospace systems life cycle design and analysis, which includes analytical assessment of the technical and programmatic aspects of a system from "cradle to grave." This paper describes the recent NASA developments in the area of collaborative engineering, the benefits (realized and anticipated) of using the developed capability, and the long-term plans for implementing this capability across the Agency.

  19. Fluvial geomorphology and river engineering: future roles utilizing a fluvial hydrosystems framework

    NASA Astrophysics Data System (ADS)

    Gilvear, David J.

    1999-12-01

    River engineering is coming under increasing public scrutiny given failures to prevent flood hazards and economic and environmental concerns. This paper reviews the contribution that fluvial geomorphology can make in the future to river engineering. In particular, it highlights the need for fluvial geomorphology to be an integral part in engineering projects, that is, to be integral to the planning, implementation, and post-project appraisal stages of engineering projects. It should be proactive rather than reactive. Areas in which geomorphologists will increasingly be able to complement engineers in river management include risk and environmental impact assessment, floodplain planning, river audits, determination of instream flow needs, river restoration, and design of ecologically acceptable channels and structures. There are four key contributions that fluvial geomorphology can make to the engineering profession with regard to river and floodplain management: to promote recognition of lateral, vertical, and downstream connectivity in the fluvial system and the inter-relationships between river planform, profile, and cross-section; to stress the importance of understanding fluvial history and chronology over a range of time scales, and recognizing the significance of both palaeo and active landforms and deposits as indicators of levels of landscape stability; to highlight the sensitivity of geomorphic systems to environmental disturbances and change, especially when close to geomorphic thresholds, and the dynamics of the natural systems; and to demonstrate the importance of landforms and processes in controlling and defining fluvial biotopes and to thus promote ecologically acceptable engineering. Challenges facing fluvial geomorphology include: gaining full acceptance by the engineering profession; widespread utilization of new technologies including GPS, GIS, image analysis of satellite and airborne remote sensing data, computer-based hydraulic modeling and geophysical techniques; dovetailing engineering approaches to the study of river channels which emphasize reach-scale flow resistance, shear stresses, and material strength with catchment scale geomorphic approaches, empirical predictions, bed and bank processes, landform evolution, and magnitude-frequency concepts; producing accepted river channel typologies; fundamental research aimed at producing more reliable deterministic equations for prediction of bed and bank stability and bedload transport; and collaboration with aquatic biologists to determine the role and importance of geomorphologically and hydraulically defined habitats.

  20. 40 CFR 270.18 - Specific part B information requirements for waste piles.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... complied with or detailed plans and an engineering report describing how the requirements of § 264.90(b)(2) will be met. (c) Detailed plans and an engineering report describing how the waste pile is designed and...(b) of this chapter, submit detailed plans, and engineering and hydrogeological reports, as...

  1. 40 CFR 270.18 - Specific part B information requirements for waste piles.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... complied with or detailed plans and an engineering report describing how the requirements of § 264.90(b)(2) will be met. (c) Detailed plans and an engineering report describing how the waste pile is designed and...(b) of this chapter, submit detailed plans, and engineering and hydrogeological reports, as...

  2. 78 FR 76383 - Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-17

    ...: LGA runways 4 and 31 runway safety area planning, environmental, and engineering. Brief Description of... Collection at EWR and Use at JFK at a $3.00 PFC Level: JFK taxiway P rehabilitation planning and engineering... delay reduction phase II--planning and engineering. Brief Description of Project Approved for Collection...

  3. 40 CFR 1068.510 - How do I prepare and apply my remedial plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) AIR POLLUTION CONTROLS GENERAL COMPLIANCE PROVISIONS FOR ENGINE PROGRAMS Reporting Defects and Recalling Engines/Equipment § 1068.510 How do I prepare and apply my remedial plan? (a) In your remedial plan, describe all of the following: (1) The class or category of engines/equipment to be recalled...

  4. The traverse planning process for D-RATS 2010

    NASA Astrophysics Data System (ADS)

    Hörz, Friedrich; Lofgren, Gary E.; Gruener, John E.; Eppler, Dean B.; Skinner, James A.; Fortezzo, Corey M.; Graf, Jodi S.; Bluethmann, William J.; Seibert, Marc A.; Bell, Ernest R.

    2013-10-01

    This report describes the traverse planning process for the Desert Research and Technology Studies (D-RATS) 2010 field simulation of a conceptual 14-day planetary mission. This activity took place between August 23 and September 17, 2010 in the San Francisco Volcanic Field, Arizona. It focused on the utilization of two pressurized rovers and a ground-based communication system, as well as on the development of mission operation concepts for long duration, dual-rover missions. The early planning process began some 12 months prior to the actual field tests and defined the first order engineering-, flight operations, and science objectives. The detailed implementation and refinement of these objectives took place over the ensuing 10 months, resulting in a large number of technical and operational constraints that affected the actual traverse route or the cumulative Extravehicular Activity (EVA) time available for detailed field observations. The science planning proceeded from the generation of photogeologic maps of the test area, to the establishment of prioritized science objectives and associated candidate sites for detailed field exploration. The combination of operational constraints and science objectives resulted in the final design of traverse routes and time lines for each of the 24 traverses needed to support 12 field days by two rovers. Examples of daily traverses will be given that will hopefully illustrate that the design of long duration, long distance planetary traverses is a highly interdisciplinary and time-consuming collaboration between diverse engineers, flight operations personnel, human factors interests, and planetary scientists.

  5. The 1985 National Aeronautics and Space Administration's Summer High School Apprenticeship Research Program (SHARP)

    NASA Technical Reports Server (NTRS)

    1985-01-01

    In 1985, a total of 126 talented high school students gained first hand knowledge about science and engineering careers by working directly with a NASA scientist or engineer during the summer. This marked the sixth year of operation for NASA's Summer High School Apprenticeship Research Program (SHARP). The major priority of maintaining the high standards and success of prior years was satisfied. The following eight sites participated in the Program: Ames Research Center, Ames' Dryden Flight Research Facility, Goddard Space Flight Center, Goddard's Wallop Flight Facility, Kennedy Space Center, Langley Research Center, Lewis Research Center, and Marshall Space Flight Center. Tresp Associates served as the SHARP contractor and worked closely with NASA staff at headquarters and the sites just mentioned to plan, implement, and evaluate the program.

  6. Productivity increase through implementation of CAD/CAE workstation

    NASA Technical Reports Server (NTRS)

    Bromley, L. K.

    1985-01-01

    The tracking and communication division computer aided design/computer aided engineering system is now operational. The system is utilized in an effort to automate certain tasks that were previously performed manually. These tasks include detailed test configuration diagrams of systems under certification test in the ESTL, floorplan layouts of future planned laboratory reconfigurations, and other graphical documentation of division activities. The significant time savings achieved with this CAD/CAE system are examined: (1) input of drawings and diagrams; (2) editing of initial drawings; (3) accessibility of the data; and (4) added versatility. It is shown that the Applicon CAD/CAE system, with its ease of input and editing, the accessibility of data, and its added versatility, has made more efficient many of the necessary but often time-consuming tasks associated with engineering design and testing.

  7. Monitoring the compliance of the academic enterprise with the Fair Labor Standards Act

    PubMed Central

    Bankston, Adriana; McDowell, Gary S.

    2017-01-01

    Background: On December 1, 2016, the Fair Labor Standards Act (FLSA) was due to be updated by the U.S. Department of Labor. Key changes included an increase in the salary threshold for exemption from overtime for working more than 40 hours per week, and indexing the salary level so that it is updated automatically every 3 years. This was predicted to have a profound effect on academe as postdoctoral researchers were mostly paid at a salary below the new threshold. On November 22, 2016, an injunction was granted nationwide, delaying implementation of the updates, which were finally struck down entirely on August 31, 2017. Here we review the key changes to the FLSA, how they came about, and how the postdoctoral population was affected. Methods: We describe recent data collection efforts to uncover what institutions with postdocs were doing to comply with the FLSA. Results: Our data showed that 57% of institutions checked (containing 41% of the estimated postdoctoral workforce in science, engineering and health) had not decided or had no public decision available one month prior to implementation, and only 35.5% of institutions were planning to raise salaries to the new minimum. After the injunction, a number of institutions and the NIH continued with their plans to raise salaries. Overall, despite the removal of a federal mandate, approximately 60% of postdocs are at institutions whose policy is to raise salaries. Conclusions: Our data show uncertainty in postdoctoral salaries in the U.S. prior to implementation of the FLSA ruling. In addition, while some institutions did suspend plans to raise postdoctoral salaries after the injunction, many continued with the raise. The implementation of postdoctoral salary raises may be inconsistent, however, as the legal minimum is still $23,660. PMID:27990268

  8. This photocopy of an engineering drawing shows the floor plan ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    This photocopy of an engineering drawing shows the floor plan of the Liner Lab, including room functions. Austin, Field & Fry, Architects Engineers, 22311 West Third Street, Los Angeles 57, California: Edwards Test Station Complex Phase II, Jet Propulsion Laboratory, California Institute of Technology, Edwards Air Force Base, Edwards, California: "Liner Laboratory, Floor Plan and Schedules," drawing no. E33/4-2, 26 June 1962. California Institute of Technology, Jet Propulsion Laboratory, Plant Engineering: engineering drawings of structures at JPL Edwards Facility. Drawings on file at JPL Plant Engineering, Pasadena, California. California Institute of Technology, Jet Propulsion Laboratory, Plant Engineering: engineering drawings of structures at JPL Edwards Facility. Drawings on file at JPL Plant Engineering, Pasadena, California - Jet Propulsion Laboratory Edwards Facility, Liner Laboratory, Edwards Air Force Base, Boron, Kern County, CA

  9. Approved Air Quality Implementation Plans in The Virgin Islands

    EPA Pesticide Factsheets

    This site contains information about air quality regulations called State Implementation Plans (SIPs), Federal Implementation Plans (FIPs), and Tribal Implementation Plans (TIPs) approved by EPA within the U.S. Virgin Islands.

  10. Definition study for variable cycle engine testbed engine and associated test program

    NASA Technical Reports Server (NTRS)

    Vdoviak, J. W.

    1978-01-01

    The product/study double bypass variable cycle engine (VCE) was updated to incorporate recent improvements. The effect of these improvements on mission range and noise levels was determined. This engine design was then compared with current existing high-technology core engines in order to define a subscale testbed configuration that simulated many of the critical technology features of the product/study VCE. Detailed preliminary program plans were then developed for the design, fabrication, and static test of the selected testbed engine configuration. These plans included estimated costs and schedules for the detail design, fabrication and test of the testbed engine and the definition of a test program, test plan, schedule, instrumentation, and test stand requirements.

  11. Comparative analysis of the designs and implementation of vehicles based on reactive propulsion proposed during the nineteenth and beginning of the twentieth centuries

    NASA Technical Reports Server (NTRS)

    Sokolskiy, V. N.

    1977-01-01

    Examination of the presently known historical scientific literature related to the problem of reactive flight indicates that considerable attention had already been given to the idea of reactive propulsion in the nineteenth century; about thirty designs for reaction flying vehicles were proposed during this period. However, the authors of a majority of the designs limited themselves only to a presentation of a diagram of the engine or an account of the principle of its operation, giving neither plans for its structural development nor precise calculations of the amount of energy required for accomplishing reaction flight. None of these authors considered the reaction flying vehicle as an object of variable mass, their choice of energy sources was extremely random, and the theory of the flight of reaction flying vehicles remained completely undeveloped. Early rocket designs of Nezhdanovsky, Ganswindt, Goddard, Tsiolkovsky, and others are examined and the evolution of liquid-propellant rocket engines, solid-propellant rocket engines, and jet aircraft engines is reviewed.

  12. How to renovate a 50-year-old wastewater treating plant: Part 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hunter, M.L.

    1996-01-01

    How does an existing refinery cost-effectively renovate wastewater/stormwater treating systems to meet today`s environmental regulations and standards? Faced with solving this problem, Amoco`s Whiting Refinery developed a project team consisting of plant and operations engineers, corporate project and design engineers, contractors and vendors to map out a strategy to re-engineer the existing wastewater treating plant (WWTP) and auxiliary functions. This case history shows how an old refinery limited by existing equipment, building space, operation`s availability requirements and costs divided the project into several design phases. The design team used a proactive approach with empowerment responsibilities to solve construction, equipment usagemore » and regulatory problems throughout the project`s lifetime. Focusing on front-end planning and customer service (the refinery), team members applied value-based engineering designs to keep costs down, implemented safe work practices during construction, used HAZOP reviews to scrutinize proposed designs for operating and maintenance procedures, etc. The result has been the renovation of a 50-year-old WWTP completed under budget, ontime and in compliance with federal mandates.« less

  13. Mission Operations Planning and Scheduling System (MOPSS)

    NASA Technical Reports Server (NTRS)

    Wood, Terri; Hempel, Paul

    2011-01-01

    MOPSS is a generic framework that can be configured on the fly to support a wide range of planning and scheduling applications. It is currently used to support seven missions at Goddard Space Flight Center (GSFC) in roles that include science planning, mission planning, and real-time control. Prior to MOPSS, each spacecraft project built its own planning and scheduling capability to plan satellite activities and communications and to create the commands to be uplinked to the spacecraft. This approach required creating a data repository for storing planning and scheduling information, building user interfaces to display data, generating needed scheduling algorithms, and implementing customized external interfaces. Complex scheduling problems that involved reacting to multiple variable situations were analyzed manually. Operators then used the results to add commands to the schedule. Each architecture was unique to specific satellite requirements. MOPSS is an expert system that automates mission operations and frees the flight operations team to concentrate on critical activities. It is easily reconfigured by the flight operations team as the mission evolves. The heart of the system is a custom object-oriented data layer mapped onto an Oracle relational database. The combination of these two technologies allows a user or system engineer to capture any type of scheduling or planning data in the system's generic data storage via a GUI.

  14. Fluor Daniel Hanford implementation plan for DOE Order 5480.28, Natural phenomena hazards mitigation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Conrads, T.J.

    1997-09-12

    Natural phenomena hazards (NPH) are unexpected acts of nature that pose a threat or danger to workers, the public, or the environment. Earthquakes, extreme winds (hurricane and tornado), snow, flooding, volcanic ashfall, and lightning strikes are examples of NPH that could occur at the Hanford Site. U.S. Department of Energy (DOE) policy requires facilities to be designed, constructed, and operated in a manner that protects workers, the public, and the environment from hazards caused by natural phenomena. DOE Order 5480.28, Natural Phenomena Hazards Mitigation, includes rigorous new natural phenomena criteria for the design of new DOE facilities, as well asmore » for the evaluation and, if necessary, upgrade of existing DOE facilities. The Order was transmitted to Westinghouse Hanford Company in 1993 for compliance and is also identified in the Project Hanford Management Contract, Section J, Appendix C. Criteria and requirements of DOE Order 5480.28 are included in five standards, the last of which, DOE-STD-1023, was released in fiscal year 1996. Because the Order was released before all of its required standards were released, enforcement of the Order was waived pending release of the last standard and determination of an in-force date by DOE Richland Operations Office (DOE-RL). Agreement also was reached between the Management and Operations Contractor and DOE-RL that the Order would become enforceable for new structures, systems, and components (SSCS) 60 days following issue of a new order-based design criteria in HNF-PRO-97, Engineering Design and Evaluation. The order also requires that commitments addressing existing SSCs be included in an implementation plan that is to be issued 1 year following the release of the last standard. Subsequently, WHC-SP-1175, Westinghouse Hanford Company Implementation Plan for DOE Order 5480.28, Natural Phenomena Hazards Mitigation, Rev. 0, was issued in November 1996, and this document, HNF-SP-1175, Fluor Daniel Hanford Implementation Plan for DOE Order 5480.28, Natural Phenomena Hazards Mitigation, is Rev. 1 of that plan.« less

  15. 77 FR 48061 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Regional Haze State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-13

    ... Promulgation of Air Quality Implementation Plans; Pennsylvania; Regional Haze State Implementation Plan...'s limited approval of Pennsylvania's Regional Haze State Implementation Plan (SIP). DATES: Effective... announcing our limited approval of Pennsylvania's Regional Haze SIP. In this document, we inadvertently...

  16. PLANS & ELEVATIONS. United Engineering Company Ltd., Alameda Shipyard. Also ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PLANS & ELEVATIONS. United Engineering Company Ltd., Alameda Shipyard. Also includes door schedule and a small scale plot plan. No architect noted. Drawn by W.H.H. Plan no. 2-N-5 (U.E. Co. plan no. 10,523). Scale 1/8 inch to the foot. March 10, 1942, last revised 10/6/43. U.S. Navy, Bureau of Yards & Docks, Contract no. bs 76, item no. 22A. Approved for construction October 9, 1943. blueprint - United Engineering Company Shipyard, Warehouse, 2900 Main Street, Alameda, Alameda County, CA

  17. SECOND FLOOR AND ROOF PLANS. United Engineering Company Ltd., Alameda ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    SECOND FLOOR AND ROOF PLANS. United Engineering Company Ltd., Alameda Shipyard, Ship Repair Facilities, Office Building. Second floor plan, and roof plan. John Hudspeth, Architect, at foot of Main Street, Alameda, Calif. Sheet no. A2 of 8 sheets, Plan no. 10,007. Scale 1/8 inch to the foot. March 18, 1942, last revised 9/22/43. U.S. Navy, Bureau of Yards & Docks, Contract no. bs 76. Approved for construction October 9, 1943. blueprint - United Engineering Company Shipyard, Office Building No. 137, 2900 Main Street, Alameda, Alameda County, CA

  18. This photographic copy of an engineering drawing shows floor plans, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    This photographic copy of an engineering drawing shows floor plans, sections and elevations of Building E-86, with details typical of the steel frame and "Transite" building construction at JPL Edwards Facility. California Institute of Technology, Jet Propulsion Laboratory, Facilities Engineering and Construction Office: "Casting & Curing, Building E-86, Floor Plan, Elevations & Section," drawing no. E86/6, 25 February 1977. California Institute of Technology, Jet Propulsion Laboratory, Plant Engineering: engineering drawings of structures at JPL Edwards Facility. Drawings on file at JPL Plant Engineering, Pasadena, California - Jet Propulsion Laboratory Edwards Facility, Casting & Curing Building, Edwards Air Force Base, Boron, Kern County, CA

  19. The Theory of Planned Behaviour Applied to Search Engines as a Learning Tool

    ERIC Educational Resources Information Center

    Liaw, Shu-Sheng

    2004-01-01

    Search engines have been developed for helping learners to seek online information. Based on theory of planned behaviour approach, this research intends to investigate the behaviour of using search engines as a learning tool. After factor analysis, the results suggest that perceived satisfaction of search engine, search engines as an information…

  20. A Working Plan for Treating the Engineering Faculty Shortage Problem.

    ERIC Educational Resources Information Center

    Shoup, Terry E., Ed.

    In view of the consequences of the engineering faculty shortage problem on engineering capabilities in the future in the United States, a working plan which will serve as a national agenda for prompt action has been developed. This plan involves the three key groups (federal government, academic community, industry) who have the vision,…

  1. The Impact of Federal Programs and Policies on Manpower Planning for Scientists and Engineers: Problems and Progress.

    ERIC Educational Resources Information Center

    Scientific Manpower Commission, Washington, DC.

    This document reports the results of a workshop held to assess the impact of federal programs and legislation on manpower planning for scientists and engineers. Included are presentations relating to manpower utilization and planning via federal government agencies and professional societies for scientists and engineers. It was concluded that the…

  2. Study of solid rocket motor for space shuttle booster, Volume 3: Program acquisition planning

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The program planning acquisition functions for the development of the solid propellant rocket engine for the space shuttle booster is presented. The subjects discussed are: (1) program management, (2) contracts administration, (3) systems engineering, (4) configuration management, and (5) maintenance engineering. The plans for manufacturing, testing, and operations support are included.

  3. 46 CFR 71.65-5 - Plans and specifications required for new construction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... dioxide, foam, and sprinkling systems. (7) Supervised Patrol Route. (e) Marine engineering. (1) For plans required for marine engineering equipment and systems, see subchapter F (Marine Engineering) of this... equipment and systems, see subchapter J (Electrical Engineering) of this chapter. (2) [Reserved] (g...

  4. Internship - practical education

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Porell, A.L.; Bauman, H.F.

    1989-01-01

    The current emphasis on regulatory compliance with environmental laws has depleted the availability of experienced environmental scientists and engineers needed to initiate critical environmental projects. Further, projects of short duration and long-term commitments to employment situations are considered a high risk for both the employer and the employee. Martin Marietta Energy Systems, Inc., has met this challenge for federal agencies through the US Department of Energy's (DOE's) Hazardous Waste Remedial Actions Program (HAZWRAP). Through unique interdepartmental agency agreements between the DOE and the Department of Defense (DOD) and contractual arrangements between Energy Systems, DOE, and the University of Tennessee's (UT's)more » Waste Management Institute (WMI), an intern program was formulated. HAZWRAP is a DOE headquarters' program for addressing hazardous-waste issues at all DOE facilities. Energy Systems is the support contractor office responsible for developing policies and implementing plans for this program. Under this charter, HAZWRAP assembled a large staff of experienced project managers for developing remedial actions plans, while providing other federal agencies assistance in implementing their remedial actions programs. HAZWRAP project managers are currently managing remedial investigations and feasibility studies at 130 federal facilities located throughout the DOD.« less

  5. Space Station redesign option A: Modular buildup concept

    NASA Technical Reports Server (NTRS)

    1993-01-01

    In early 1993, President Clinton mandated that NASA look at lower cost alternatives to Space Station Freedom. He also established an independent advisory committee - the Blue Ribbon Panel - to review the redesign work and evaluate alternatives. Daniel Goldin, NASA Administrator, established a Station Redesign Team that began operating in late March from Crystal City, Virginia. NASA intercenter teams - one each at Marshall Space Flight Center, Johnson Space Center, and Langley Research Center provided engineering and other support. The results of the Option A study done at Marshall Space Flight Center are summarized. Two configurations (A-1 and A-2) are covered. Additional data is provided in the briefing package MSFC SRT-001, Final System Review to SRT-002, Space Station Option A Modular Buildup Concept, Volumes 1-5, Revision B, June 10, 1993. In June 1993, President Clinton decided to proceed with a modular concept consistent with Option A, and asked NASA to provide an Implementation Plan by September. All data from the Option A redesign activity was provided to NASA's Transition Team for use in developing the Implementation Plan.

  6. Engineering calculations for communications satellite systems planning

    NASA Technical Reports Server (NTRS)

    Martin, C. H.; Gonsalvez, D. J.; Levis, C. A.; Wang, C. W.

    1983-01-01

    Progress is reported on a computer code to improve the efficiency of spectrum and orbit utilization for the Broadcasting Satellite Service in the 12 GHz band for Region 2. It implements a constrained gradient search procedure using an exponential objective function based on aggregate signal to noise ratio and an extended line search in the gradient direction. The procedure is tested against a manually generated initial scenario and appears to work satisfactorily. In this test it was assumed that alternate channels use orthogonal polarizations at any one satellite location.

  7. Life sciences biomedical research planning for Space Station

    NASA Technical Reports Server (NTRS)

    Primeaux, Gary R.; Michaud, Roger; Miller, Ladonna; Searcy, Jim; Dickey, Bernistine

    1987-01-01

    The Biomedical Research Project (BmRP), a major component of the NASA Life Sciences Space Station Program, incorporates a laboratory for the study of the effects of microgravity on the human body, and the development of techniques capable of modifying or counteracting these effects. Attention is presently given to a representative scenario of BmRP investigations and associated engineering analyses, together with an account of the evolutionary process by which the scenarios and the Space Station design requirements they entail are identified. Attention is given to a tether-implemented 'variable gravity centrifuge'.

  8. Water resources planning for rivers draining into Mobile Bay

    NASA Technical Reports Server (NTRS)

    April, G. C.

    1976-01-01

    The application of remote sensing, automatic data processing, modeling and other aerospace related technologies to hydrological engineering and water resource management are discussed for the entire river drainage system which feeds the Mobile Bay estuary. The adaptation and implementation of existing mathematical modeling methods are investigated for the purpose of describing the behavior of Mobile Bay. Of particular importance are the interactions that system variables such as river flow rate, wind direction and speed, and tidal state have on the water movement and quality within the bay system.

  9. Probabilistic Requirements (Partial) Verification Methods Best Practices Improvement. Variables Acceptance Sampling Calculators: Empirical Testing. Volume 2

    NASA Technical Reports Server (NTRS)

    Johnson, Kenneth L.; White, K. Preston, Jr.

    2012-01-01

    The NASA Engineering and Safety Center was requested to improve on the Best Practices document produced for the NESC assessment, Verification of Probabilistic Requirements for the Constellation Program, by giving a recommended procedure for using acceptance sampling by variables techniques as an alternative to the potentially resource-intensive acceptance sampling by attributes method given in the document. In this paper, the results of empirical tests intended to assess the accuracy of acceptance sampling plan calculators implemented for six variable distributions are presented.

  10. Comparison of Quality Engineering Practices in Malaysian and Indonesian Automotive Related Companies

    NASA Astrophysics Data System (ADS)

    Putri, Nilda Tri; Sha'ri Mohd, Yusof; Irianto, Dradjad

    2016-02-01

    The main motivating factor driving this research is to find differences between the automotive related companies in Malaysia and Indonesia with regard to quality engineering (QE) implementation. A comparative study between Malaysia and Indonesia provides the opportunity to gain perspective and thorough understanding of the similarities and differences on the critical factors for successful QE practices in the context of both these countries. Face to face interviews are used to compare the QE practices in two automotive companies in Malaysia and Indonesia, respectively. The findings of study showed that both countries have clear quality objectives to achieving zero defects in processes and products and total customer satisfaction. Top and middle management in both countries were found to be directly involved in quality improvement on the shop floor to provide On-The-Job training and actively encourage team members to perform quality problem solving through the formation of quality control circles (QCC) particularly in Indonesia automotive industry. In Malaysia automotive industry, the implementation was not fully effective, but they have started to cultivate those values in the daily execution. Based on the case study results and analysis, the researcher has provided suggestions for both countries as an improvement plan for successful QE implementation. These recommendations will allow management to implement appropriate strategies for better QE implementation which hopefully can improve company's performance and ultimately the making the automotive industry in both countries to reach world class quality. It is strongly believed that the findings of this study can help Malaysia and Indonesia automotive industries in their efforts to become more effective and competitive.

  11. 14 CFR 151.5 - General policies.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... planning and engineering proposal or airport development project must provide for the planning or..., approval of an advance planning and engineering proposal or a project application is limited to planning or airport development necessary for civil aviation. (d) Stage development. In any case in which airport...

  12. 14 CFR 151.5 - General policies.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... planning and engineering proposal or airport development project must provide for the planning or..., approval of an advance planning and engineering proposal or a project application is limited to planning or airport development necessary for civil aviation. (d) Stage development. In any case in which airport...

  13. 14 CFR 151.5 - General policies.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... planning and engineering proposal or airport development project must provide for the planning or..., approval of an advance planning and engineering proposal or a project application is limited to planning or airport development necessary for civil aviation. (d) Stage development. In any case in which airport...

  14. 14 CFR 151.5 - General policies.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... planning and engineering proposal or airport development project must provide for the planning or..., approval of an advance planning and engineering proposal or a project application is limited to planning or airport development necessary for civil aviation. (d) Stage development. In any case in which airport...

  15. 14 CFR 151.5 - General policies.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... planning and engineering proposal or airport development project must provide for the planning or..., approval of an advance planning and engineering proposal or a project application is limited to planning or airport development necessary for civil aviation. (d) Stage development. In any case in which airport...

  16. Risk Management Implementation Tool

    NASA Technical Reports Server (NTRS)

    Wright, Shayla L.

    2004-01-01

    Continuous Risk Management (CM) is a software engineering practice with processes, methods, and tools for managing risk in a project. It provides a controlled environment for practical decision making, in order to assess continually what could go wrong, determine which risk are important to deal with, implement strategies to deal with those risk and assure the measure effectiveness of the implemented strategies. Continuous Risk Management provides many training workshops and courses to teach the staff how to implement risk management to their various experiments and projects. The steps of the CRM process are identification, analysis, planning, tracking, and control. These steps and the various methods and tools that go along with them, identification, and dealing with risk is clear-cut. The office that I worked in was the Risk Management Office (RMO). The RMO at NASA works hard to uphold NASA s mission of exploration and advancement of scientific knowledge and technology by defining and reducing program risk. The RMO is one of the divisions that fall under the Safety and Assurance Directorate (SAAD). I worked under Cynthia Calhoun, Flight Software Systems Engineer. My task was to develop a help screen for the Continuous Risk Management Implementation Tool (RMIT). The Risk Management Implementation Tool will be used by many NASA managers to identify, analyze, track, control, and communicate risks in their programs and projects. The RMIT will provide a means for NASA to continuously assess risks. The goals and purposes for this tool is to provide a simple means to manage risks, be used by program and project managers throughout NASA for managing risk, and to take an aggressive approach to advertise and advocate the use of RMIT at each NASA center.

  17. A Framework for Assessing the Reusability of Hardware (Reusable Rocket Engines)

    NASA Technical Reports Server (NTRS)

    Childress-Thompson, Rhonda; Thomas, Dale; Farrington, Philip

    2016-01-01

    Within the past few years, there has been a renewed interest in reusability as it applies to space flight hardware. Commercial companies such as Space Exploration Technologies Corporation (SpaceX), Blue Origin, and United Launch Alliance (ULA) are pursuing reusable hardware. Even foreign companies are pursuing this option. The Indian Space Research Organization (ISRO) launched a reusable space plane technology demonstrator and Airbus Defense and Space is planning to recover the main engines and avionics from its Advanced Expendable Launcher with Innovative engine Economy [1] [2]. To date, the Space Shuttle remains as the only Reusable Launch (RLV) to have flown repeated missions and the Space Shutte Main Engine (SSME) is the only demonstrated reusable engine. Whether the hardware being considered for reuse is a launch vehicle (fully reusable), a first stage (partially reusable), or a booster engine (single component), the overall governing process is the same; it must be recovered and recertified for flight. Therefore, there is a need to identify the key factors in determining the reusability of flight hardware. This paper begins with defining reusability to set the context, addresses the significance of reuse, and discusses areas that limit successful implementation. Finally, this research identifies the factors that should be considered when incorporating reuse.

  18. Multi-Attribute Selection of Coal Center Location: A Case Study in Thailand

    NASA Astrophysics Data System (ADS)

    Kuakunrittiwong, T.; Ratanakuakangwan, S.

    2016-11-01

    Under Power Development Plan 2015, Thailand has to diversify its heavily gas-fired electricity generation. The main owner of electricity transmission grids is responsible to implement several coal-fired power plants with clean coal technology. To environmentally handle and economically transport unprecedented quantities of sub-bituminous and bituminous coal, a coal center is required. The location of such facility is an important strategic decision and a paramount to the success of the energy plan. As site selection involves many criteria, Fuzzy Analytical Hierarchy Process or Fuzzy-AHP is applied to select the most suitable location among three candidates. Having analyzed relevant criteria and the potential alternatives, the result reveals that engineering and socioeconomic are important criteria and Map Ta Phut is the most suitable site for the coal center.

  19. Advanced Simulation and Computing Fiscal Year 2016 Implementation Plan, Version 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McCoy, M.; Archer, B.; Hendrickson, B.

    2015-08-27

    The Stockpile Stewardship Program (SSP) is an integrated technical program for maintaining the safety, surety, and reliability of the U.S. nuclear stockpile. The SSP uses nuclear test data, computational modeling and simulation, and experimental facilities to advance understanding of nuclear weapons. It includes stockpile surveillance, experimental research, development and engineering programs, and an appropriately scaled production capability to support stockpile requirements. This integrated national program requires the continued use of experimental facilities and programs, and the computational capabilities to support these programs. The purpose of this IP is to outline key work requirements to be performed and to control individualmore » work activities within the scope of work. Contractors may not deviate from this plan without a revised WA or subsequent IP.« less

  20. Satellite Power Systems (SPS) concept definition study, exhibit C. Volume 2, part 2: System engineering, cost and programmatics

    NASA Technical Reports Server (NTRS)

    Hanley, G. M.

    1979-01-01

    Volume 2, Part 2, of a seven volume Satellite Power Systems (SPS) report is presented. Part 2 covers cost and programmatics and is divided into four sections. The first section gives illustrations of the SPS reference satellite and rectenna concept, and an overall scenario for SPS space transportation involvement. The second section presents SPS program plans for the implementation of PHASE C/D activities. These plans describe SPS program schedules and networks, critical items of systems evolution/technology development, and the natural resources analysis. The fourth section presents summary comments on the methods and rationale followed in arriving at the results documented. Suggestions are also provided in those areas where further analysis or evaluation will enhance SPS cost and programmatic definitions.

  1. 46 CFR 91.55-5 - Plans and specifications required for new construction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... systems. (e) Marine engineering. For plans required for marine engineering equipment and systems, see... electrical engineering, equipment and systems, see subchapter J (Electrical Engineering) of this chapter. (g... bottoms, etc., and including inboard and outboard profile. (b) Hull structure. 1 (1) *Inner Bottom Plating...

  2. Tsunami Preparedness, Response, Mitigation, and Recovery Planning in California

    NASA Astrophysics Data System (ADS)

    Miller, K.; Wilson, R. I.; Johnson, L. A.; Mccrink, T. P.; Schaffer, E.; Bower, D.; Davis, M.

    2016-12-01

    In California officials of state, federal, and local governments have coordinated to implement a Tsunami Preparedness and Mitigation Program. Building upon past preparedness efforts carried out year-round this group has leveraged government support at all levels. A primary goal is for everyone who lives at or visits the coast to understand basic life-safety measures when responding to official tsunami alerts or natural warnings. Preparedness actions include: observation of National Tsunami Preparedness Week, local "tsunami walk" drills, scenario-based exercises, testing of notification systems for public alert messaging, outreach materials, workshops, presentations, and media events.Program partners have worked together to develop emergency operations, evacuation plans, and tsunami annexes to plans for counties, cities, communities, and harbors in 20 counties along the coast. Working with the state and federal partner agencies, coastal communities have begun to incorporate sophisticated tsunami "Playbook" scenario information into their planning. These innovative tsunami evacuation and response tools provide detailed evacuation maps and associated real-time response information for identifying areas where flooding could occur. This is critical information for evacuating populations on land, near the shoreline.Acting on recommendations from the recent USGS-led, multi-discipline Science Application for Risk Reduction Tsunami Scenario report on impacts to California and American Society of Civil Engineering adoption proposals to the International Building Code, the state has begun to develop a strategy to incorporate probabilistic tsunami findings into state level policy recommendations for addressing building code adoption, as well as approach land use planning and building code implementation in local jurisdictions. Additional efforts, in the context of sustained community resiliency, include developing recovery planning guidance for local communities.

  3. 77 FR 5191 - Approval and Promulgation of Air Quality Implementation Plans; District of Columbia; Regional...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-02

    ... Promulgation of Air Quality Implementation Plans; District of Columbia; Regional Haze State Implementation Plan... of Columbia Regional Haze Plan, a revision to the District of Columbia State Implementation Plan (SIP... existing anthropogenic impairment of visibility in mandatory Class I areas through a regional haze program...

  4. Stereotactic Body Radiation Therapy Delivery in a Genetically Engineered Mouse Model of Lung Cancer.

    PubMed

    Du, Shisuo; Lockamy, Virginia; Zhou, Lin; Xue, Christine; LeBlanc, Justin; Glenn, Shonna; Shukla, Gaurav; Yu, Yan; Dicker, Adam P; Leeper, Dennis B; Lu, You; Lu, Bo

    2016-11-01

    To implement clinical stereotactic body radiation therapy (SBRT) using a small animal radiation research platform (SARRP) in a genetically engineered mouse model of lung cancer. A murine model of multinodular Kras-driven spontaneous lung tumors was used for this study. High-resolution cone beam computed tomography (CBCT) imaging was used to identify and target peripheral tumor nodules, whereas off-target lung nodules in the contralateral lung were used as a nonirradiated control. CBCT imaging helps localize tumors, facilitate high-precision irradiation, and monitor tumor growth. SBRT planning, prescription dose, and dose limits to normal tissue followed the guidelines set by RTOG protocols. Pathologic changes in the irradiated tumors were investigated using immunohistochemistry. The image guided radiation delivery using the SARRP system effectively localized and treated lung cancer with precision in a genetically engineered mouse model of lung cancer. Immunohistochemical data confirmed the precise delivery of SBRT to the targeted lung nodules. The 60 Gy delivered in 3 weekly fractions markedly reduced the proliferation index, Ki-67, and increased apoptosis per staining for cleaved caspase-3 in irradiated lung nodules. It is feasible to use the SARRP platform to perform dosimetric planning and delivery of SBRT in mice with lung cancer. This allows for preclinical studies that provide a rationale for clinical trials involving SBRT, especially when combined with immunotherapeutics. Copyright © 2016. Published by Elsevier Inc.

  5. Developing Smartphone Apps for Education, Outreach, Science, and Engineering

    NASA Astrophysics Data System (ADS)

    Weatherwax, A. T.; Fitzsimmons, Z.; Czajkowski, J.; Breimer, E.; Hellman, S. B.; Hunter, S.; Dematteo, J.; Savery, T.; Melsert, K.; Sneeringer, J.

    2010-12-01

    The increased popularity of mobile phone apps provide scientists with a new avenue for sharing and distributing data and knowledge with colleagues, while also providing meaningful education and outreach products for consumption by the general public. Our initial development of iPhone and Android apps centered on the distribution of exciting auroral images taken at the South Pole for education and outreach purposes. These portable platforms, with limited resources when compared to computers, presented a unique set of design and implementation challenges that we will discuss in this presentation. For example, the design must account for limited memory; screen size; processing power; battery life; and potentially high data transport costs. Some of these unique requirements created an environment that enabled undergraduate and high-school students to participate in the creation of these apps. Additionally, during development it became apparent that these apps could also serve as data analysis and engineering tools. Our presentation will further discuss our plans to use apps not only for Education and Public Outreach, but for teaching, science and engineering.

  6. Software Engineering Improvement Activities/Plan

    NASA Technical Reports Server (NTRS)

    2003-01-01

    bd Systems personnel accomplished the technical responsibilities for this reporting period, as planned. A close working relationship was maintained with personnel of the MSFC Avionics Department Software Group (ED14). Work accomplishments included development, evaluation, and enhancement of a software cost model, performing literature search and evaluation of software tools available for code analysis and requirements analysis, and participating in other relevant software engineering activities. Monthly reports were submitted. This support was provided to the Flight Software Group/ED 1 4 in accomplishing the software engineering improvement engineering activities of the Marshall Space Flight Center (MSFC) Software Engineering Improvement Plan.

  7. An end-to-end workflow for engineering of biological networks from high-level specifications.

    PubMed

    Beal, Jacob; Weiss, Ron; Densmore, Douglas; Adler, Aaron; Appleton, Evan; Babb, Jonathan; Bhatia, Swapnil; Davidsohn, Noah; Haddock, Traci; Loyall, Joseph; Schantz, Richard; Vasilev, Viktor; Yaman, Fusun

    2012-08-17

    We present a workflow for the design and production of biological networks from high-level program specifications. The workflow is based on a sequence of intermediate models that incrementally translate high-level specifications into DNA samples that implement them. We identify algorithms for translating between adjacent models and implement them as a set of software tools, organized into a four-stage toolchain: Specification, Compilation, Part Assignment, and Assembly. The specification stage begins with a Boolean logic computation specified in the Proto programming language. The compilation stage uses a library of network motifs and cellular platforms, also specified in Proto, to transform the program into an optimized Abstract Genetic Regulatory Network (AGRN) that implements the programmed behavior. The part assignment stage assigns DNA parts to the AGRN, drawing the parts from a database for the target cellular platform, to create a DNA sequence implementing the AGRN. Finally, the assembly stage computes an optimized assembly plan to create the DNA sequence from available part samples, yielding a protocol for producing a sample of engineered plasmids with robotics assistance. Our workflow is the first to automate the production of biological networks from a high-level program specification. Furthermore, the workflow's modular design allows the same program to be realized on different cellular platforms simply by swapping workflow configurations. We validated our workflow by specifying a small-molecule sensor-reporter program and verifying the resulting plasmids in both HEK 293 mammalian cells and in E. coli bacterial cells.

  8. Implementation of Quality Assurance Systems at E.T.S. Ingenieros Agrónomos of Madrid in the Framework of E.H.E.

    NASA Astrophysics Data System (ADS)

    Arce, A.; Tarquis, A. M.; Cartagena, M. C.

    2012-04-01

    The Bologna Process is to improve the quality of education, mobility, diversity and the competitiveness and involves three fundamental changes: transform of the structure of titles, changing in methods of teaching and implementation of the systems of quality assurance. Once that titles structure given by the E.T.S. Agronomic Engineer (ETSIA) have been defined, and introduced new methods of learning, this work has focused in the third point: implementation of quality assurance systems as well as the new three titles planning that begins to impart at ETSIA, Madrid, during 2010-2011 course. The academic year 2010-2011 was the first year of implementation of the Bologna Process, this paper attempts to compare the academic results obtained by students in the three new degrees in the subject of Chemistry I and II compared with the results obtained in the same subject in the degree of Agronomic Engineer in the past four years. The academic results have been lower than expected and worse than in previous courses. The paper tries to account for these results based on the percentage of compliance with the guidance of teachers, and based on student participation and training prior to beginning the course. Finally, propose possible solutions to try to correct these results in future courses, with the aim of improving efficiency rates, success and absenteeism important in the first year since it will condition the dropout rate of these new degrees.

  9. Engineering Sciences Strategic Leadership Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hahn, Heidi A.

    The purpose of this report is to promote the three key elements of engineering capabilities, staff and engagement in coordination with an R&D investment cycle; and establish an Engineering Steering Council to own and guide this leadership plan.

  10. Hydrologic Engineering Center River Analysis System (HEC-RAS) Water Temperature Models Developed for the Missouri River Recovery Management Plan and Environmental Impact Statement

    DTIC Science & Technology

    2017-09-18

    Temperature Models Developed for the Missouri River Recovery Management Plan and Environmental Impact Statement En vi ro nm en ta l L ab or at or y...Engineering Center-River Analysis System (HEC-RAS) Water Temperature Models Developed for the Missouri River Recovery Management Plan and Environmental...Prepared for U.S. Army Corps of Engineers Washington, DC 20314-1000 Under Project 396939, “Missouri River Recovery Management Plan and Environmental

  11. Slush Hydrogen (SLH2) technology development for application to the National Aerospace Plane (NASP)

    NASA Technical Reports Server (NTRS)

    Dewitt, Richard L.; Hardy, Terry L.; Whalen, Margaret V.; Richter, G. Paul

    1989-01-01

    The National Aerospace Plane (NASP) program is giving us the opportunity to reach new unique answers in a number of engineering categories. The answers are considered enhancing technology or enabling technology. Airframe materials and densified propellants are examples of enabling technology. The National Aeronautics and Space Administration's Lewis Research Center has the task of providing the technology data which will be used as the basis to decide if slush hydrogen (SLH2) will be the fuel of choice for the NASP. The objectives of this NASA Lewis program are: (1) to provide, where possible, verified numerical models of fluid production, storage, transfer, and feed systems, and (2) to provide verified design criteria for other engineered aspects of SLH2 systems germane to a NASP. This program is a multiyear multimillion dollar effort. The present pursuit of the above listed objectives is multidimensional, covers a range of problem areas, works these to different levels of depth, and takes advantage of the resources available in private industry, academia, and the U.S. Government. The NASA Lewis overall program plan is summarized. The initial implementation of the plan will be unfolded and the present level of efforts in each of the resource areas will be discussed. Results already in hand will be pointed out. A description of additionally planned near-term experimental and analytical work is described.

  12. Collaborative Mission Design at NASA Langley Research Center

    NASA Technical Reports Server (NTRS)

    Gough, Kerry M.; Allen, B. Danette; Amundsen, Ruth M.

    2005-01-01

    NASA Langley Research Center (LaRC) has developed and tested two facilities dedicated to increasing efficiency in key mission design processes, including payload design, mission planning, and implementation plan development, among others. The Integrated Design Center (IDC) is a state-of-the-art concurrent design facility which allows scientists and spaceflight engineers to produce project designs and mission plans in a real-time collaborative environment, using industry-standard physics-based development tools and the latest communication technology. The Mission Simulation Lab (MiSL), a virtual reality (VR) facility focused on payload and project design, permits engineers to quickly translate their design and modeling output into enhanced three-dimensional models and then examine them in a realistic full-scale virtual environment. The authors were responsible for envisioning both facilities and turning those visions into fully operational mission design resources at LaRC with multiple advanced capabilities and applications. In addition, the authors have created a synergistic interface between these two facilities. This combined functionality is the Interactive Design and Simulation Center (IDSC), a meta-facility which offers project teams a powerful array of highly advanced tools, permitting them to rapidly produce project designs while maintaining the integrity of the input from every discipline expert on the project. The concept-to-flight mission support provided by IDSC has shown improved inter- and intra-team communication and a reduction in the resources required for proposal development, requirements definition, and design effort.

  13. Site Characterization Report (Building 202). Volume 2. Appendicies A-H.

    DTIC Science & Technology

    1996-04-01

    Bionetics,Groundwater and Wells, Environmental Science and Engineering, Inc., Installation Assessment of ERADCOM Activities, Environmental Science and...Engineering, Inc., Plan for the Assessment of Contamination at Woodbridge Research Facility, Environmental Science and Engineering, Inc., Remedial...Action Plan for the Woodbridge Research Facility PCB Disposal Site, Environmental Science and Engineering, Inc., Remedial Investigation and

  14. Floor Plans Engine Removal Platform, Hold Down Arm Platform, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Floor Plans - Engine Removal Platform, Hold Down Arm Platform, Hydraulic Equipment Platforms, Isometric Cutaway of Engine Removal Platform, Isometric Cutaway of Hold Down Arm Platform, Isometric Cutaway of Hydraulic Platforms and Engine Support System Access - Marshall Space Flight Center, Saturn V S-IC Static Test Facility, West Test Area, Huntsville, Madison County, AL

  15. 24 CFR 598.605 - Implementation plan.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 3 2014-04-01 2013-04-01 true Implementation plan. 598.605 Section 598.605 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued... Grants § 598.605 Implementation plan. (a) Implementation plan content. An EZ must submit an...

  16. 77 FR 41279 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Regional Haze State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-13

    ... Promulgation of Air Quality Implementation Plans; Pennsylvania; Regional Haze State Implementation Plan AGENCY... the Regional Haze State Implementation Plan (SIP) (hereafter RH SIP) revision submitted by the... anthropogenic impairment of visibility in mandatory Class I areas [[Page 41280

  17. 76 FR 12945 - Instructions for Implementing Climate Change Adaptation Planning in Accordance With Executive...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-09

    ... COUNCIL ON ENVIRONMENTAL QUALITY Instructions for Implementing Climate Change Adaptation Planning... Availability of Climate Change Adaptation Planning Implementing Instructions. SUMMARY: The Chair of the Council... for Implementing Climate Change Adaptation Planning are now available at: http://www.whitehouse.gov...

  18. 7 CFR 1724.40 - General.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES Electric System Planning... long-term needs for plant additions, improvements, replacements, and retirements for their electric systems. The primary components of the planning system consist of long-range engineering plans and...

  19. 58. Photographic copy of original construction plan (St. Paul Engineer's ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    58. Photographic copy of original construction plan (St. Paul Engineer's Office, Wabasha St. Bridge, Plan of Masonry, February 1899); south abutment - Wabasha Street Bridge, Spanning Mississippi River at Wabasha Street, Saint Paul, Ramsey County, MN

  20. Test/QA plan for the verification testing of diesel exhaust catalysts, particulate filters and engine modification control technologies for highway and nonroad use diesel engines

    EPA Science Inventory

    This ETV test/QA plan for heavy-duty diesel engine testing at the Southwest Research Institute’s Department of Emissions Research (DER) describes how the Federal Test Procedure (FTP), as listed in 40 CFR Part 86 for highway engines and 40 CFR Part 89 for nonroad engines, will be ...

  1. Management tools for R&D engineering projects: Coordination perspective for large international consortium (NeXOS)

    NASA Astrophysics Data System (ADS)

    Castro, Ayoze; Memè, Simone; Quevedo, Eduardo; Waldmann, Christoph; Pearlman, Jay; Delory, Eric; Llinás, Octavio

    2017-04-01

    NeXOS is a cross-functional and multidisciplinary project funded under the EU FP7 Program, which involves 21 organizations from six different European countries. They all have different backgrounds, interests, business models and perspectives. To be successful, NeXOS applied an international recognized management methodology tailored to the specific project's environment and conditions, with an explicit structure based on defined roles and responsibilities for the people involved in the project and a means for effective communication between them (Fig.1). The project, divided in four different stages of requirements, design, integration, validation and demonstration, allows a clearer monitor of its progress, a comparison of the level of achievement in accordance with the plan and an earlier detection of problems/issues, leading to implementation of less disruptive, but still effective corrective actions. NeXOS is following an ambitious plan to develop innovative sensor systems with a high degree of modularity and interoperability, starting with requirements definition through validation and demonstration phase. To make this integrative approach possible, a management development strategy has been used incorporating systems engineering methods (Fig.2). Although this is standard practice in software development and large scale systems such as aircraft production, it is still new in the ocean hardware business and therefore NeXOS was a test case for this development concept. The question is one of scale as ocean observation systems are typically built on the scale of a few with co-located teams. With a system of diverse technologies (optical, acoustic, platform interfaces), there are cultural differences that must be bridged. The greatest challenge is in the implementation and the willingness of different teams to work with an engineering process, which may help ultimate system integration, but may place additional burdens on individual participants. This presentation will address approaches for effective operations in this environment.

  2. After-school enrichment and the activity theory: How can a management service organization assist schools with reducing the achievement gap among minority and non-minority students in science, technology, engineering, and mathematics (STEM) during the after-school hours?

    NASA Astrophysics Data System (ADS)

    Flowers, Reagan D.

    The primary purpose of this study was to investigate how a management service organization can assist schools with reducing the achievement gap between minority and non-minority students in science, technology, engineering, and mathematics (STEM) during the after-school hours. Developing a strategic plan through creating a program that provides support services for the implementation of hands-on activities in STEM for children during the after-school hours was central to this purpose. This Project Demonstrating Excellence (PDE), a social action project, also presents historical and current after-school program developments in the nation. The study is quantitative and qualitative in nature. Surveys were utilized to quantitatively capture the opinions of participants in the social action project on three specific education related issues: (1) disparity in academic motivation of students to participate in after-school STEM enrichment programs; (2) whether teachers and school administrators saw a need for STEM after-school enrichment; and (3) developing STEM after-school programs that were centered on problem-solving and higher-order thinking skills to develop students' interest in STEM careers. The sample consisted of 50 participants comprised of students, teachers, and administrators. The focus groups and interviews provided the qualitative data for the study. The qualitative sample consisted of 14 participants comprised of students, parents and teachers, administrators, an education consultant, and a corporate sponsor. The empirical data obtained from the study survey, focus groups, and interviews provided a comprehensive profile on the current views and future expectations of STEM after-school enrichment, student and school needs, and community partnerships with STEM companies. Results of the study and review of the implementation of the social action project, C-STEM (communication, science, technology, engineering, and mathematics) Teacher and Student Support Services, Inc., revealed the need and focus for STEM after-school enrichment programs in Houston, Texas. This result, along with requirements of STEM Research and Special Programs Administrations and a multiyear and multilevel strategic plan inspired by this study, led to the conceptualization, development, and implementation of C-STEM Teacher and Student Support Services, Inc. at multiple schools in Houston, Texas. The purpose of C-STEM Teacher and Student Support Services, Inc. is to provide hands-on support services that encourage schools, organizations and families to improve academic achievement and socioemotional development through project-based learning in communication, science, technology, engineering, and mathematics (CSTEM) in grades 4-12.

  3. MHD program plan, FY 1991

    NASA Astrophysics Data System (ADS)

    1990-10-01

    The current magnetohydrodynamic MHD program being implemented is a result of a consensus established in public meetings held by the Department of Energy in 1984. The public meetings were followed by the formulation of a June 1984 Coal-Fired MHD Preliminary Transition and Program Plan. This plan focused on demonstrating the proof-of-concept (POC) of coal-fired MHD electric power plants by the early 1990s. MHD test data indicate that while there are no fundamental technical barriers impeding the development of MHD power plants, technical risk remains. To reduce the technical risk three key subsystems (topping cycle, bottoming cycle, and seed regeneration) are being assembled and tested separately. The program does not require fabrication of a complete superconducting magnet, but rather the development and testing of superconductor cables. The topping cycle system test objectives can be achieved using a conventional iron core magnet system already in place at a DOE facility. Systems engineering-derived requirements and analytical modeling to support scale-up and component design guide the program. In response to environmental, economic, engineering, and utility acceptance requirements, design choices and operating modes are tested and refined to provide technical specifications for meeting commercial criteria. These engineering activities are supported by comprehensive and continuing systems analyses to establish realistic technical requirements and cost data. Essential elements of the current program are to: develop technical and environmental data for the integrated MHD topping cycle and bottoming cycle systems through POC testing (1000 and 4000 hours, respectively); design, construct, and operate a POC seed regeneration system capable of processing spent seed materials from the MHD bottoming cycle; prepare conceptual designs for a site specific MHD retrofit plant; and continue supporting research necessary for system testing.

  4. PILING PLAN OF SHIPBUILDING WAYS AND WHIRLEY CRANE SUPPORT. United ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PILING PLAN OF SHIPBUILDING WAYS AND WHIRLEY CRANE SUPPORT. United Engineering Company Ltd., Alameda Shipbuilding Plant. General plan and two sections. James J. Walsh, Consulting Engineer. Sheet no. 2. Scales 1 inch to 10 feet, and 1/4 inch to one foot. April 20, 1941, revised 5/7/41. blueprint - United Engineering Company Shipyard, Shipway Nos. 1 & 2, 2900 Main Street, Alameda, Alameda County, CA

  5. 40 CFR Appendix X to Part 86 - Sampling Plans for Selective Enforcement Auditing of Heavy-Duty Engines and Light-Duty Trucks

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 19 2014-07-01 2014-07-01 false Sampling Plans for Selective Enforcement Auditing of Heavy-Duty Engines and Light-Duty Trucks X Appendix X to Part 86 Protection of... AND IN-USE HIGHWAY VEHICLES AND ENGINES Pt. 86, App. X Appendix X to Part 86—Sampling Plans for...

  6. 40 CFR 52.672 - Approval of plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Idaho § 52.672 Approval of plans. (a) Carbon Monoxide. (1) EPA approves as a revision to the Idaho State Implementation Plan, the Limited Maintenance Plan for.... [Reserved] (e) Particulate Matter. (1) EPA approves as a revision to the Idaho State Implementation Plan...

  7. 78 FR 17835 - Approval and Promulgation of Federal Implementation Plan for Oil and Natural Gas Well Production...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-22

    ...The EPA is taking final action to promulgate a Reservation- specific Federal Implementation Plan in order to regulate emissions from oil and natural gas production facilities located on the Fort Berthold Indian Reservation in North Dakota. The Federal Implementation Plan includes basic air quality regulations for the protection of communities in and adjacent to the Fort Berthold Indian Reservation. The Federal Implementation Plan requires owners and operators of oil and natural gas production facilities to reduce emissions of volatile organic compounds emanating from well completions, recompletions, and production and storage operations. This Federal Implementation Plan will be implemented by the EPA, or a delegated tribal authority, until replaced by a Tribal Implementation Plan. The EPA proposed a Reservation-specific Federal Implementation Plan concurrently with an interim final rule on August 15, 2012. This final Federal Implementation Plan replaces the interim final rule in all intents and purposes on the effective date of the final rule. The EPA is taking this action pursuant to the Clean Air Act (CAA).

  8. Lunar Dust Mitigation Technology Development

    NASA Technical Reports Server (NTRS)

    Hyatt, Mark J.; Deluane, Paul B.

    2008-01-01

    NASA s plans for implementing the Vision for Space Exploration include returning to the moon as a stepping stone for further exploration of Mars, and beyond. Dust on the lunar surface has a ubiquitous presence which must be explicitly addressed during upcoming human lunar exploration missions. While the operational challenges attributable to dust during the Apollo missions did not prove critical, the comparatively long duration of impending missions presents a different challenge. Near term plans to revisit the moon places a primary emphasis on characterization and mitigation of lunar dust. Comprised of regolith particles ranging in size from tens of nanometers to microns, lunar dust is a manifestation of the complex interaction of the lunar soil with multiple mechanical, electrical, and gravitational effects. The environmental and anthropogenic factors effecting the perturbation, transport, and deposition of lunar dust must be studied in order to mitigate it s potentially harmful effects on exploration systems. This paper presents the current perspective and implementation of dust knowledge management and integration, and mitigation technology development activities within NASA s Exploration Technology Development Program. This work is presented within the context of the Constellation Program s Integrated Lunar Dust Management Strategy. The Lunar Dust Mitigation Technology Development project has been implemented within the ETDP. Project scope and plans will be presented, along with a a perspective on lessons learned from Apollo and forensics engineering studies of Apollo hardware. This paper further outlines the scientific basis for lunar dust behavior, it s characteristics and potential effects, and surveys several potential strategies for its control and mitigation both for lunar surface operations and within the working volumes of a lunar outpost.

  9. Contractors Road Heavy Equipment Area SWMU 055 Corrective Measures Implementation Progress Report Kennedy Space Center, Florida

    NASA Technical Reports Server (NTRS)

    Johnson, Jill W. (Compiler)

    2015-01-01

    This Corrective Measures Implementation (CMI) Progress Report documents: (i) activities conducted as part of supplemental assessment activities completed from June 2009 through November 2014; (ii) Engineering Evaluation (EE) Advanced Data Packages (ADPs); and (iii) recommendations for future activities related to corrective measures at the Site. Applicable meeting minutes are provided as Appendix A. The following EE ADPs for CRHE are included with this CMI Progress Report: center dot Supplemental Site Characterization ADP (Step 1 EE) (Appendix B) center dot Site Characterization ADP (Step 1 EE) for Hot Spot 1 (HS1) (Appendix C) center dot Remedial Alternatives Evaluation (Step 2 EE) ADP for HS1 (Appendix D) center dot Interim Measures Work Plan (Step 3 EE) ADP for HS1 (Appendix E) center dot Site Characterization ADP (Step 1 EE) ADP for Hot Spot 2 (HS2), High Concentration Plume (HCP), and Low Concentration Plume (LCP) (Appendix F) A summary of direct-push technology (DPT) and groundwater monitoring well sampling results are provided in Appendices G and H, respectively. The Interim Land Use Control Implementation Plan (LUCIP) is provided as Appendix I. Monitoring well completion reports, other applicable field forms, survey data, and analytical laboratory reports are provided as Appendices J through M, respectively, in the electronic copy of this document. Selected Site photographs are provided in Appendix N. The interim groundwater monitoring plan and document revision log are included as Appendices O and P, respectively. KSC Electronic Data Deliverable (KEDD) files are provided on the attached compact disk.

  10. 24 CFR 598.605 - Implementation plan.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 3 2012-04-01 2012-04-01 false Implementation plan. 598.605 Section 598.605 Housing and Urban Development Regulations Relating to Housing and Urban Development... Empowerment Zone Grants § 598.605 Implementation plan. (a) Implementation plan content. An EZ must submit an...

  11. 24 CFR 598.605 - Implementation plan.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 3 2013-04-01 2013-04-01 false Implementation plan. 598.605 Section 598.605 Housing and Urban Development Regulations Relating to Housing and Urban Development... Empowerment Zone Grants § 598.605 Implementation plan. (a) Implementation plan content. An EZ must submit an...

  12. 78 FR 68005 - Approval and Promulgation of Implementation Plans; Mississippi; Transportation Conformity SIP...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-13

    ... this Federal Register, EPA is approving the State's implementation plan revision as a direct final rule...] Approval and Promulgation of Implementation Plans; Mississippi; Transportation Conformity SIP--Memorandum... proposing to approve a State Implementation Plan revision submitted by the Mississippi Department of...

  13. Effective protection of open space: does planning matter?

    PubMed

    Steelman, Toddi A; Hess, George R

    2009-07-01

    High quality plans are considered a crucial part of good land use planning and often used as a proxy measure for success in plan implementation and goal attainment. We explored the relationship of open space plan quality to the implementation of open space plans and attainment of open space protection goals in Research Triangle, North Carolina, USA. To measure plan quality, we used a standard plan evaluation matrix that we modified to focus on open space plans. We evaluated all open space plans in the region that contained a natural resource protection element. To measure plan implementation and open space protection, we developed an online survey and administered it to open space planners charged with implementing the plans. The survey elicited each planner's perspective on aspects of open space protection in his or her organization. The empirical results (1) indicate that success in implementation and attaining goals are not related to plan quality, (2) highlight the importance of when and how stakeholders are involved in planning and implementation processes, and (3) raise questions about the relationship of planning to implementation. These results suggest that a technically excellent plan does not guarantee the long-term relationships among local land owners, political and appointed officials, and other organizations that are crucial to meeting land protection goals. A greater balance of attention to the entire decision process and building relationships might lead to more success in protecting open space.

  14. Integrated System for Autonomous Science

    NASA Technical Reports Server (NTRS)

    Chien, Steve; Sherwood, Robert; Tran, Daniel; Cichy, Benjamin; Davies, Ashley; Castano, Rebecca; Rabideau, Gregg; Frye, Stuart; Trout, Bruce; Shulman, Seth; hide

    2006-01-01

    The New Millennium Program Space Technology 6 Project Autonomous Sciencecraft software implements an integrated system for autonomous planning and execution of scientific, engineering, and spacecraft-coordination actions. A prior version of this software was reported in "The TechSat 21 Autonomous Sciencecraft Experiment" (NPO-30784), NASA Tech Briefs, Vol. 28, No. 3 (March 2004), page 33. This software is now in continuous use aboard the Earth Orbiter 1 (EO-1) spacecraft mission and is being adapted for use in the Mars Odyssey and Mars Exploration Rovers missions. This software enables EO-1 to detect and respond to such events of scientific interest as volcanic activity, flooding, and freezing and thawing of water. It uses classification algorithms to analyze imagery onboard to detect changes, including events of scientific interest. Detection of such events triggers acquisition of follow-up imagery. The mission-planning component of the software develops a response plan that accounts for visibility of targets and operational constraints. The plan is then executed under control by a task-execution component of the software that is capable of responding to anomalies.

  15. Analysis of Propagation Plans in NSF-Funded Education Development Projects

    NASA Astrophysics Data System (ADS)

    Stanford, Courtney; Cole, Renee; Froyd, Jeff; Henderson, Charles; Friedrichsen, Debra; Khatri, Raina

    2017-08-01

    Increasing adoption and adaptation of promising instructional strategies and materials has been identified as a critical component needed to improve science, technology, engineering, and mathematics (STEM) education. This paper examines typical propagation practices and resulting outcomes of proposals written by developers of educational innovations. These proposals were analyzed using the Designing for Sustained Adoption Assessment Instrument (DSAAI), an instrument developed to evaluate propagation plans, and the results used to predict the likelihood that a successful project would result in adoption by others. We found that few education developers propose strong propagation plans. Afterwards, a follow-up analysis was conducted to see which propagation strategies developers actually used to help develop, disseminate, and support their innovations. A web search and interviews with principal investigators were used to determine the degree to which propagation plans were actually implemented and to estimate adoption of the innovations. In this study, we analyzed 71 education development proposals funded by the National Science Foundation and predicted that 80% would be unsuccessful in propagating their innovations. Follow-up data collection with a subset of these suggests that the predictions were reasonably accurate.

  16. Using virtual reality for science mission planning: A Mars Pathfinder case

    NASA Technical Reports Server (NTRS)

    Kim, Jacqueline H.; Weidner, Richard J.; Sacks, Allan L.

    1994-01-01

    NASA's Mars Pathfinder Project requires a Ground Data System (GDS) that supports both engineering and scientific payloads with reduced mission operations staffing, and short planning schedules. Also, successful surface operation of the lander camera requires efficient mission planning and accurate pointing of the camera. To meet these challenges, a new software strategy that integrates virtual reality technology with existing navigational ancillary information and image processing capabilities. The result is an interactive workstation based applications software that provides a high resolution, 3-dimensial, stereo display of Mars as if it were viewed through the lander camera. The design, implementation strategy and parametric specification phases for the development of this software were completed, and the prototype tested. When completed, the software will allow scientists and mission planners to access simulated and actual scenes of Mars' surface. The perspective from the lander camera will enable scientists to plan activities more accurately and completely. The application will also support the sequence and command generation process and will allow testing and verification of camera pointing commands via simulation.

  17. Technology in education: A guidebook for developing a science and math education support program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wagner, C.L.

    1992-09-01

    Education is vital to survival and success in an increasingly technical world, and the quality of education is the responsibility of everyone students, teachers, parents, industry, and government. Any technical organization wanting to contribute to that success through its local education system can do so easily and effectively through careful planning. This report details that planning process and includes methods to (1) identify the interests, strengths, and resources of the technical organization; (2) identify the needs of the local education system; (3) interface with local school system administration, principals, and teachers; and (4) develop a unique plan to match themore » organization's strengths and resources with the needs of the school system. Following these getting started'' activities is the actual program that the Engineering Technology Division implemented in a local elementary school, including the curriculum, topics, and actual lesson plans used by technical personnel in the classroom. Finally, there are enrichment activities for teachers and students, suggestions for measuring the success of an education support program, and an overview of student responses to questions about the overall program.« less

  18. Technology in education: A guidebook for developing a science and math education support program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wagner, C.L.

    1992-09-01

    Education is vital to survival and success in an increasingly technical world, and the quality of education is the responsibility of everyone students, teachers, parents, industry, and government. Any technical organization wanting to contribute to that success through its local education system can do so easily and effectively through careful planning. This report details that planning process and includes methods to (1) identify the interests, strengths, and resources of the technical organization; (2) identify the needs of the local education system; (3) interface with local school system administration, principals, and teachers; and (4) develop a unique plan to match themore » organization`s strengths and resources with the needs of the school system. Following these ``getting started`` activities is the actual program that the Engineering Technology Division implemented in a local elementary school, including the curriculum, topics, and actual lesson plans used by technical personnel in the classroom. Finally, there are enrichment activities for teachers and students, suggestions for measuring the success of an education support program, and an overview of student responses to questions about the overall program.« less

  19. Integrating Science and Engineering to Implement Evidence-Based Practices in Health Care Settings.

    PubMed

    Wu, Shinyi; Duan, Naihua; Wisdom, Jennifer P; Kravitz, Richard L; Owen, Richard R; Sullivan, J Greer; Wu, Albert W; Di Capua, Paul; Hoagwood, Kimberly Eaton

    2015-09-01

    Integrating two distinct and complementary paradigms, science and engineering, may produce more effective outcomes for the implementation of evidence-based practices in health care settings. Science formalizes and tests innovations, whereas engineering customizes and optimizes how the innovation is applied tailoring to accommodate local conditions. Together they may accelerate the creation of an evidence-based healthcare system that works effectively in specific health care settings. We give examples of applying engineering methods for better quality, more efficient, and safer implementation of clinical practices, medical devices, and health services systems. A specific example was applying systems engineering design that orchestrated people, process, data, decision-making, and communication through a technology application to implement evidence-based depression care among low-income patients with diabetes. We recommend that leading journals recognize the fundamental role of engineering in implementation research, to improve understanding of design elements that create a better fit between program elements and local context.

  20. The dish-Rankine SCSTPE program (Engineering Experiment no. 1). [systems engineering and economic analysis for a small community solar thermal electric system

    NASA Technical Reports Server (NTRS)

    Pons, R. L.; Grigsby, C. E.

    1980-01-01

    Activities planned for phase 2 Of the Small Community Solar Thermal Power Experiment (PFDR) program are summarized with emphasis on a dish-Rankine point focusing distributed receiver solar thermal electric system. Major design efforts include: (1) development of an advanced concept indirect-heated receiver;(2) development of hardware and software for a totally unmanned power plant control system; (3) implementation of a hybrid digital simulator which will validate plant operation prior to field testing; and (4) the acquisition of an efficient organic Rankine cycle power conversion unit. Preliminary performance analyses indicate that a mass-produced dish-Rankine PFDR system is potentially capable of producing electricity at a levelized busbar energy cost of 60 to 70 mills per KWh and with a capital cost of about $1300 per KW.

  1. Summer High School Apprenticeship Research Program (SHARP) of the National Aeronautics and Space Administration

    NASA Technical Reports Server (NTRS)

    1984-01-01

    A total of 125 talented high school students had the opportunity to gain first hand experience about science and engineering careers by working directly with a NASA scientist or engineer during the summer. This marked the fifth year of operation for NASA's Summer High School Apprenticehsip Research Program (SHARP). Ferguson Bryan served as the SHARP contractor and worked closely with NASA staff at Headquarters and the eight participating sites to plan, implement, and evaluate the Program. The main objectives were to strengthen SHARP and expand the number of students in the Program. These eight sites participated in the Program: Ames Research Center North, Ames' Dryden Flight Research Facility, Goddard Space Flight Center, Goddard's Wallops Flight Facility, Kennedy Space Center, Langley Research Center, Lewis Research Center, and Marshall Space Flight Center.

  2. Experience gained from the application of basic quality assurance procedures in a Greek university engineering department

    NASA Astrophysics Data System (ADS)

    Stamatelos, A. M.

    2010-06-01

    During the last decade, significant funding has become available to Greek public universities to support the convergence to the common European space of higher education. In a number of departments, this funding was wisely invested in the development of a quality culture, covering not only the educational process, but also the services offered by the department's administration and technical support staff. This paper presents the design and implementation of a quality-oriented studies' reform plan in the Mechanical Engineering Department, University of Thessaly in the period 2002-2008. Based on the successful experience from its application, a significant part of the personnel and students have become acquainted with basic quality assurance procedures and performance evaluation. Experience and lessons learnt from this effort are reported and discussed in this paper.

  3. 32 CFR 651.4 - Responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) and Materiel Fielding Plans, Demilitarization/Disposal Plans, system engineering reviews/Integrated... (including NEPA) into the system acquisition strategy, milestone review planning, system engineering, and... copy and make this guidance available on the World Wide Web (WWW) and other electronic means. (13...

  4. 5. Photograph of line drawing in possession of Engineering Plans ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. Photograph of line drawing in possession of Engineering Plans and Services Division, Rock Island Arsenal. PLAN, UNDATED. - Rock Island Arsenal, Building No. 105, South Avenue between Gillespie Avenue & Second Street, Rock Island, Rock Island County, IL

  5. Space Situational Awareness Data Processing Scalability Utilizing Google Cloud Services

    NASA Astrophysics Data System (ADS)

    Greenly, D.; Duncan, M.; Wysack, J.; Flores, F.

    Space Situational Awareness (SSA) is a fundamental and critical component of current space operations. The term SSA encompasses the awareness, understanding and predictability of all objects in space. As the population of orbital space objects and debris increases, the number of collision avoidance maneuvers grows and prompts the need for accurate and timely process measures. The SSA mission continually evolves to near real-time assessment and analysis demanding the need for higher processing capabilities. By conventional methods, meeting these demands requires the integration of new hardware to keep pace with the growing complexity of maneuver planning algorithms. SpaceNav has implemented a highly scalable architecture that will track satellites and debris by utilizing powerful virtual machines on the Google Cloud Platform. SpaceNav algorithms for processing CDMs outpace conventional means. A robust processing environment for tracking data, collision avoidance maneuvers and various other aspects of SSA can be created and deleted on demand. Migrating SpaceNav tools and algorithms into the Google Cloud Platform will be discussed and the trials and tribulations involved. Information will be shared on how and why certain cloud products were used as well as integration techniques that were implemented. Key items to be presented are: 1.Scientific algorithms and SpaceNav tools integrated into a scalable architecture a) Maneuver Planning b) Parallel Processing c) Monte Carlo Simulations d) Optimization Algorithms e) SW Application Development/Integration into the Google Cloud Platform 2. Compute Engine Processing a) Application Engine Automated Processing b) Performance testing and Performance Scalability c) Cloud MySQL databases and Database Scalability d) Cloud Data Storage e) Redundancy and Availability

  6. Final Radiological Assessment of External Exposure for CLEAR-Line Americium Recovery Operations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Davis, Adam C.; Belooussova, Olga N.; Hetrick, Lucas Duane

    2014-11-12

    Los Alamos National Laboratory is currently planning to implement an americium recovery program. The americium, ordinarily isotopically pure 241Am, would be extracted from existing Pu materials, converted to an oxide and shipped to support fabrication of americium oxide-beryllium neutron sources. These operations would occur in the currently proposed Chloride Extraction and Actinide Recovery (CLEAR) line of glove boxes. This glove box line would be collocated with the currently-operational Experimental Chloride Extraction Line (EXCEL). The focus of this document is to provide an in-depth assessment of the currently planned radiation protection measures and to determine whether or not further design workmore » is required to satisfy design-goal and ALARA requirements. Further, this document presents a history of americium recovery operations in the Department of Energy and high-level descriptions of the CLEAR line operations to provide a basis of comparison. Under the working assumptions adopted by this study, it was found that the evaluated design appears to mitigate doses to a level that satisfies the ALARA-in-design requirements of 10 CFR 835 as implemented by the Los Alamos National Laboratory procedure P121. The analyses indicate that extremity doses would also meet design requirements. Dose-rate calculations were performed using the radiation transport code MCNP5 and doses were estimated using a time-motion study developed in consort with the subject matter expert. A copy of this report and all supporting documentation are located on the Radiological Engineering server at Y:\\Rad Engineering\\2013 PROJECTS\\TA-55 Clear Line.« less

  7. 78 FR 41731 - Source Specific Federal Implementation Plan for Implementing Best Available Retrofit Technology...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-11

    ... Federal Implementation Plan for Implementing Best Available Retrofit Technology for Four Corners Power... Implementation Plan (FIP) to implement the Best Available Retrofit Technology (BART) requirement of the Regional... given the uncertainties in the electrical market in Arizona, EPA is proposing to extend the date by...

  8. 32 CFR 634.24 - Traffic planning and codes.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... enforcement officer, engineer, safety officer, and other concerned staff agencies. Highway engineering representatives from adjacent civil communities must be consulted to ensure the installation plan is compatible... and minor routes, location of traffic control devices, and conditions requiring engineering or...

  9. 7 CFR 1710.250 - General.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    .... (i) A borrower's CWP or special engineering studies must be supported by a Borrower's Environmental..., and retirements. The primary components of the system consist of long-range engineering plans, construction work plans (CWPs), CWP amendments, and special engineering and cost studies. Long range...

  10. Photographic copy of floor plan, undated, Civil Engineers Office, in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of floor plan, undated, Civil Engineers Office, in possession of Selfridge Base Civil Engineers Office, Mt. Clemens, Michigan - Selfridge Field, Building No. 833, West of Mulberry Street north of George Avenue, Mount Clemens, Macomb County, MI

  11. CISN ShakeAlert: Using early warnings for earthquakes in California

    NASA Astrophysics Data System (ADS)

    Vinci, M.; Hellweg, M.; Jones, L. M.; Khainovski, O.; Schwartz, K.; Lehrer, D.; Allen, R. M.; Neuhauser, D. S.

    2009-12-01

    Educated users who have developed response plans and procedures are just as important for an earthquake early warning (EEW) system as are the algorithms and computers that process the data and produce the warnings. In Japan, for example, the implementation of the EEW system which now provides advanced alerts of ground shaking included intense outreach efforts to both institutional and individual recipients. Alerts are now used in automatic control systems that stop trains, place sensitive equipment in safe mode and isolate hazards while the public takes cover. In California, the California Integrated Seismic Network (CISN) is now developing and implementing components of a prototype system for EEW, ShakeAlert. As this processing system is developed, we invite a suite of perspective users from critical industries and institutions throughout California to partner with us in developing useful ShakeAlert products and procedures. At the same time, we will support their efforts to determine and implement appropriate responses to an early warning of earthquake shaking. As a first step, in a collaboration with BART, we have developed a basic system allowing BART’s operation center to receive realtime ground shaking information from more than 150 seismic stations operating in the San Francisco Bay Area. BART engineers are implementing a display system for this information. Later phases will include the development of improved response procedures utilizing this information. We plan to continue this collaboration to include more sophisticated information from the prototype CISN ShakeAlert system.

  12. 78 FR 40654 - Approval, Disapproval and Promulgation of Implementation Plans; State of Wyoming; Regional Haze...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-08

    ..., Disapproval and Promulgation of Implementation Plans; State of Wyoming; Regional Haze State Implementation Plan; Federal Implementation Plan for Regional Haze; Notice of Public Hearings AGENCY: Environmental...) addressing regional haze under. We are making this change in response to letters submitted by the Governor of...

  13. 78 FR 78310 - Approval and Promulgation of Implementation Plans; North Carolina; Transportation Conformity...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-26

    ... Federal Register, EPA is approving the State's implementation plan revision as a direct final rule without...] Approval and Promulgation of Implementation Plans; North Carolina; Transportation Conformity Memorandum of... Implementation Plan submitted on July 12, 2013, through the North Carolina Department of Environment and Natural...

  14. 77 FR 58072 - Finding of Substantial Inadequacy of Implementation Plan; Call for California State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-19

    ... Substantial Inadequacy of Implementation Plan; Call for California State Implementation Plan Revision; South Coast AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: In response to a... that the California State Implementation Plan (SIP) for the Los Angeles-South Coast Air Basin (South...

  15. 78 FR 30770 - Approval and Promulgation of Air Quality Implementation Plans; Illinois; Air Quality Standards...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-23

    ... Promulgation of Air Quality Implementation Plans; Illinois; Air Quality Standards Revision AGENCY... Illinois state implementation plan (SIP) to reflect current National Ambient Air Quality Standards (NAAQS... Implementation Plan at 35 Illinois Administrative Code part 243, which updates National Ambient Air Quality...

  16. Job Prospects of 1971 Graduates. Engineering Manpower Bulletin Number 20.

    ERIC Educational Resources Information Center

    Alden, John D.

    Statistics for 33,902 of 1971 engineering graduates were used to describe job prospects of the graduates. Findings include: (1) engineering graduates were largely successful in finding jobs or carrying out other plans; (2) about one out of every five engineering graduates at the bachelor's and master's degree levels had plans to continue full-time…

  17. Interactive 3D geodesign tool for multidisciplinary wind turbine planning.

    PubMed

    Rafiee, Azarakhsh; Van der Male, Pim; Dias, Eduardo; Scholten, Henk

    2018-01-01

    Wind turbine site planning is a multidisciplinary task comprising of several stakeholder groups from different domains and with different priorities. An information system capable of integrating the knowledge on the multiple aspects of a wind turbine plays a crucial role on providing a common picture to the involved groups. In this study, we have developed an interactive and intuitive 3D system (Falcon) for planning wind turbine locations. This system supports iterative design loops (wind turbine configurations), based on the emerging field of geodesign. The integration of GIS, game engine and the analytical models has resulted in an interactive platform with real-time feedback on the multiple wind turbine aspects which performs efficiently for different use cases and different environmental settings. The implementation of tiling techniques and open standard web services support flexible and on-the-fly loading and querying of different (massive) geospatial elements from different resources. This boosts data accessibility and interoperability that are of high importance in a multidisciplinary process. The incorporation of the analytical models in Falcon makes this system independent from external tools for different environmental impacts estimations and results in a unified platform for performing different environmental analysis in every stage of the scenario design. Game engine techniques, such as collision detection, are applied in Falcon for the real-time implementation of different environmental models (e.g. noise and visibility). The interactivity and real-time performance of Falcon in any location in the whole country assist the stakeholders in the seamless exploration of various scenarios and their resulting environmental effects and provides a scope for an interwoven discussion process. The flexible architecture of the system enables the effortless application of Falcon in other countries, conditional to input data availability. The embedded open web standards in Falcon results in a smooth integration of different input data which are increasingly available online and through standardized access mechanisms. Copyright © 2017 Elsevier Ltd. All rights reserved.

  18. Wind Tunnel Management and Resource Optimization: A Systems Modeling Approach

    NASA Technical Reports Server (NTRS)

    Jacobs, Derya, A.; Aasen, Curtis A.

    2000-01-01

    Time, money, and, personnel are becoming increasingly scarce resources within government agencies due to a reduction in funding and the desire to demonstrate responsible economic efficiency. The ability of an organization to plan and schedule resources effectively can provide the necessary leverage to improve productivity, provide continuous support to all projects, and insure flexibility in a rapidly changing environment. Without adequate internal controls the organization is forced to rely on external support, waste precious resources, and risk an inefficient response to change. Management systems must be developed and applied that strive to maximize the utility of existing resources in order to achieve the goal of "faster, cheaper, better". An area of concern within NASA Langley Research Center was the scheduling, planning, and resource management of the Wind Tunnel Enterprise operations. Nine wind tunnels make up the Enterprise. Prior to this research, these wind tunnel groups did not employ a rigorous or standardized management planning system. In addition, each wind tunnel unit operated from a position of autonomy, with little coordination of clients, resources, or project control. For operating and planning purposes, each wind tunnel operating unit must balance inputs from a variety of sources. Although each unit is managed by individual Facility Operations groups, other stakeholders influence wind tunnel operations. These groups include, for example, the various researchers and clients who use the facility, the Facility System Engineering Division (FSED) tasked with wind tunnel repair and upgrade, the Langley Research Center (LaRC) Fabrication (FAB) group which fabricates repair parts and provides test model upkeep, the NASA and LARC Strategic Plans, and unscheduled use of the facilities by important clients. Expanding these influences horizontally through nine wind tunnel operations and vertically along the NASA management structure greatly increases the complexity of developing a model that can be used for successfully implementing a standardized management planning tool. The objective of this study was to implement an Integrated Wind Tunnel Planning System to improve the operations within the aeronautics testing and research group, in particular Wind Tunnel Enterprise. The study included following steps: Conducted literature search and expert discussions (NASA and Old Dominion University faculty), Performed environmental scan of NASA Langley wind tunnel operations as foundation for problem definition. Established operation requirements and evaluation methodologies. Examined windtunnel operations to map out the common characteristics, critical components, and system structure. Reviewed and evaluated various project scheduling and management systems for implementation, Evaluated and implemented "Theory of Constraints (TOC)" project scheduling methodology at NASA Langley wind tunnel operations together with NASA staff.

  19. 13. Photograph of line drawing in possession of Engineering Plans ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. Photograph of line drawing in possession of Engineering Plans and Services Division, Rock Island Arsenal. BASEMENT PLAN, 1920. - Rock Island Arsenal, Building No. 90, East Avenue between North Avenue & King Drive, Rock Island, Rock Island County, IL

  20. 6. photograph of line drawing in possession of Engineering Plans ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. photograph of line drawing in possession of Engineering Plans and Services Division, Rock Island Arsenal. ELEVATIONS AND PLANS FOR POWDER BARREL RACK, 1889. - Rock Island Arsenal, Building No. 280, Sylvan Drive, Rock Island, Rock Island County, IL

  1. 15. Photograph of line drawing in possession of Engineering Plans ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Photograph of line drawing in possession of Engineering Plans and Services Division, Rock Island Arsenal. SECOND FLOOR PLAN, 1920. - Rock Island Arsenal, Building No. 90, East Avenue between North Avenue & King Drive, Rock Island, Rock Island County, IL

  2. 14. Photograph of line drawing in possession of Engineering Plans ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. Photograph of line drawing in possession of Engineering Plans and Services Division, Rock Island Arsenal. FIRST FLOOR PLAN, 1920. - Rock Island Arsenal, Building No. 90, East Avenue between North Avenue & King Drive, Rock Island, Rock Island County, IL

  3. 16. Photograph of line drawing in possession of Engineering Plans ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. Photograph of line drawing in possession of Engineering Plans and Services Division, Rock Island Arsenal. ATTIC PLAN, 1920. - Rock Island Arsenal, Building No. 90, East Avenue between North Avenue & King Drive, Rock Island, Rock Island County, IL

  4. Photocopy of plan (in U.S. Army office of Army Engineers ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of plan (in U.S. Army office of Army Engineers plans and drawings, Fort Hancock and Sandy hook proving ground, record group 7, drawer 44, Cartographic and Architectural branc, The National Archives, Washington, DC), U.S. Engineer Office, New York District, Harbor Defenses of New York Mine Boathouse, location plan and elevations, Fort Hancock, New Jersey, July 1943 Detail of western docking structure - U.S. Coast Guard Sandy Hook Station, Western Docking Structure, West of intersection of Canfield Road & Hartshorne Drive, Highlands, Monmouth County, NJ

  5. 12. Historic plot plan and drawings index for rocket engine ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. Historic plot plan and drawings index for rocket engine test facility, June 28, 1956. NASA GRC drawing number CE-101810. On file at NASA Glenn Research Center. - Rocket Engine Testing Facility, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  6. FIRST FLOOR PLAN AND SCHEDULES. United Engineering Company Ltd., Alameda ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FIRST FLOOR PLAN AND SCHEDULES. United Engineering Company Ltd., Alameda Shipyard, Ship Repair Facilities, Office Building. First floor plan, door transom schedule, interior finish schedule, sash schedule, exterior color schedule, and location plot plan. John Hudspeth, Architect, at foot of Main Street, Alameda, Calif. Sheet no. Al of 8 sheets, Plan no. 10,007. Scale 1/8 inch to the foot. March 18, 1942, last revised 9/25/43. U.S. Navy, Bureau of Yards & Docks, Contract no. bs 76. Approved for construction October 9, 1943. blueprint - United Engineering Company Shipyard, Office Building No. 137, 2900 Main Street, Alameda, Alameda County, CA

  7. Insights of health district managers on the implementation of primary health care outreach teams in Johannesburg, South Africa: a descriptive study with focus group discussions.

    PubMed

    Moosa, Shabir; Derese, Anselme; Peersman, Wim

    2017-01-21

    Primary health care (PHC) outreach teams are part of a policy of PHC re-engineering in South Africa. It attempts to move the deployment of community health workers (CHWs) from vertical programmes into an integrated generalised team-based approach to care for defined populations in municipal wards. There has little evaluation of PHC outreach teams. Managers' insights are anecdotal. This is descriptive qualitative study with focus group discussions with health district managers of Johannesburg, the largest city in South Africa. This was conducted in a sequence of three meetings with questions around implementation, human resources, and integrated PHC teamwork. There was a thematic content analysis of validated transcripts using the framework method. There were two major themes: leadership-management challenges and human resource challenges. Whilst there was some positive sentiment, leadership-management challenges loomed large: poor leadership and planning with an under-resourced centralised approach, poor communications both within the service and with community, concerns with its impact on current services and resistance to change, and poor integration, both with other streams of PHC re-engineering and current district programmes. Discussion by managers on human resources was mostly on the plight of CHWs and calls for formalisation of CHWs functioning and training and nurse challenges with inappropriate planning and deployment of the team structure, with brief mention of the extended team. Whilst there is positive sentiment towards intent of the PHC outreach team, programme managers in Johannesburg were critical of management of the programme in their health district. Whilst the objective of PHC reform is people-centred health care, its implementation struggles with a centralising tendency amongst managers in the health service in South Africa. Managers in Johannesburg advocated for decentralisation. The implementation of PHC outreach teams is also limited by difficulties with formalisation and training of CHWs and appropriate task shifting to nurses. Change management is required to create true integrate PHC teamwork. Policy review requires addressing these issues.

  8. Protecting workers from pathogens. Employers must act now to comply with OSHA's new standard on bloodborne pathogens.

    PubMed

    White, C L

    1992-04-01

    A new standard set forth by the Occupational Safety and Health Administration (OSHA) requires healthcare employers to implement sweeping new controls in areas such as record keeping, engineering, hazard prevention, and work practice. Through the bloodborne pathogen standard, which went into effect on March 6, OSHA acknowledges that healthcare workers face significant health risks as a result of occupational exposure to blood and other infectious materials. Although most prudent healthcare providers already adhere to the Centers for Disease Control's universal precautions, the OSHA regulations include several additional mandatory measures that are more specific and stringent. The additional measures include the development of an exposure control plan, procedures for responding to an employee's exposure to bloodborne pathogens, the implementation of certain engineering and work practice controls to eliminate or minimize on-the-job exposure risks, and the provision of personal protective equipment and information and training programs. OSHA estimates that the greatest cost component of implementing procedures to bring a facility into compliance is attributable to the purchase of personal protective equipment. Although the costs of compliance are substantial, OSHA has estimated that these costs represent less than 1 percent of the healthcare industry's annual revenues. Violation of the bloodborne pathogen standard may result in penalties of up to $70,000, depending on the severity of the infraction. Criminal penalties are also possible for willful violations that result in worker death.

  9. 40 CFR 52.1392 - Federal Implementation Plan for the Billings/Laurel Area.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 4 2013-07-01 2013-07-01 false Federal Implementation Plan for the Billings/Laurel Area. 52.1392 Section 52.1392 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Montana § 52.1392 Federal Implementation Plan for...

  10. 40 CFR 52.1392 - Federal Implementation Plan for the Billings/Laurel Area.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 4 2012-07-01 2012-07-01 false Federal Implementation Plan for the Billings/Laurel Area. 52.1392 Section 52.1392 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Montana § 52.1392 Federal Implementation Plan for...

  11. 40 CFR 52.1392 - Federal Implementation Plan for the Billings/Laurel Area.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 4 2014-07-01 2014-07-01 false Federal Implementation Plan for the Billings/Laurel Area. 52.1392 Section 52.1392 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Montana § 52.1392 Federal Implementation Plan for...

  12. 40 CFR 52.1392 - Federal Implementation Plan for the Billings/Laurel Area.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Federal Implementation Plan for the Billings/Laurel Area. 52.1392 Section 52.1392 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Montana § 52.1392 Federal Implementation Plan for...

  13. 77 FR 16937 - Approval and Promulgation of Air Quality Implementation Plans; West Virginia; Regional Haze State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-23

    ... Promulgation of Air Quality Implementation Plans; West Virginia; Regional Haze State Implementation Plan AGENCY... limited disapproval of West Virginia's Regional Haze State Implementation Plan (SIP) revision. EPA is... mandatory Class I areas through a regional haze program. EPA is also approving this revision as meeting the...

  14. 77 FR 65151 - Finding of Substantial Inadequacy of Implementation Plan; Call for California State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-25

    ... the Federal Register on September 19, 2012. In that action, in response to a remand by the Ninth... Substantial Inadequacy of Implementation Plan; Call for California State Implementation Plan Revision; South... State Implementation Plan (SIP) for the Los Angeles-South Coast Air Basin (South Coast) is substantially...

  15. 40 CFR 93.118 - Criteria and procedures: Motor vehicle emissions budget.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... PLANS Conformity to State or Federal Implementation Plans of Transportation Plans, Programs, and..., consultation among federal, State, and local agencies occurred; full implementation plan documentation was... response to comments that are required to be submitted with any implementation plan. EPA will document its...

  16. 40 CFR 93.118 - Criteria and procedures: Motor vehicle emissions budget.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... PLANS Conformity to State or Federal Implementation Plans of Transportation Plans, Programs, and..., consultation among federal, State, and local agencies occurred; full implementation plan documentation was... response to comments that are required to be submitted with any implementation plan. EPA will document its...

  17. Improving safety of aircraft engines: a consortium approach

    NASA Astrophysics Data System (ADS)

    Brasche, Lisa J. H.

    1996-11-01

    With over seven million departures per year, air transportation has become not a luxury, but a standard mode of transportation for the United States. A critical aspect of modern air transport is the jet engine, a complex engineered component that has enabled the rapid travel to which we have all become accustomed. One of the enabling technologies for safe air travel is nondestructive evaluation, or NDE, which includes various inspection techniques used to assess the health or integrity of a structure, component, or material. The Engine Titanium Consortium (ETC) was established in 1993 to respond to recommendations made by the Federal Aviation Administration (FAA) Titanium Rotating Components Review Team (TRCRT) for improvements in inspection of engine titanium. Several recent accomplishments of the ETC are detailed in this paper. The objective of the Engine Titanium Consortium is to provide the FAAand the manufacturers with reliable and costeffective new methods and/or improvements in mature methods for detecting cracks, inclusions, and imperfections in titanium. The consortium consists of a team of researchers from academia and industry-namely, Iowa State University, Allied Signal Propulsion Engines, General Electric Aircraft Engines, and Pratt & Whitney Engines-who work together to develop program priorities, organize a program plan, conduct the research, and implement the solutions. The true advantage of the consortium approach is that it brings together the research talents of academia and the engineering talents of industry to tackle a technology-base problem. In bringing industrial competitors together, the consortium ensures that the research results, which have safety implications and result from FAA funds, are shared and become part of the public domain.

  18. Study on diversified cultivation orientation and pattern of optoelectronic major undergraduates

    NASA Astrophysics Data System (ADS)

    Liu, Zhiying

    2017-08-01

    To improve the research quality preparation for graduate study and looking for job competition ability of undergraduates students, the education orientation objective need to be explicit. Universities need develop undergraduates' cultivation plan according to students' classification. Based on analysis of students export characteristic, there will be corresponding cultivation plan. Keep tracking study during the cultivation plan implantation process, the Curriculum system and related manage documents are revised corresponding to exist problems. There are mainly three kinds of undergraduates' career direction plan for opto-electronic major undergraduates. In addition to the vast majority university graduates opting for direct employment, nearly one third of university students choose to take part in the postgraduate entrance exams and other further education abroad, and also one-tenth choose their own businesses, university chooses are diversified. The exports are further studying as graduates, working and study abroad. Because national defense students are also recruited, the cultivation plan will be diversified to four types. For students, who go to work directly after graduation, the "Excellence engineers plan" is implemented to enhance their practice ability. For students, who will study further as graduate student, the scientific innovation research ability cultivation is paid more attention to make good foundation for their subsequent development. For students, who want to study abroad after graduation, the bilingual teaching method is introduced, and the English environment is built. We asked foreign professionals to give lectures for students. The knowledge range is extending, and the exchange and cooperation chance is provided at the same time. And the cultivation plan is revised during docking with Universities abroad. For national defense students, combat training and other defense theory courses are added to make them familiar with force knowledge. And with national defense students' excellence engineer plan, more army practice chance is provided. The students can integrate into army life much faster. The advantages of national defense students are much more highlighted. The graduates can serve motherland better than before. It is shown from the practice process that the revised cultivation plan is suitable for diversified undergraduates. And the education result is improved in a large amount consequently.

  19. Experiences with Extra-Vehicular Activities in Response to Critical ISS Contingencies

    NASA Technical Reports Server (NTRS)

    Van Cise, E. A.; Kelly, B. J.; Radigan, J. P.; Cranmer, C. W.

    2016-01-01

    The maturation of the International Space Station (ISS) design from the proposed Space Station Freedom to today's current implementation resulted in external hardware redundancy vulnerabilities in the final design. Failure to compensate for or respond to these vulnerabilities could put the ISS in a posture to where it could no longer function as a habitable space station. In the first years of ISS assembly, these responses were to largely be addressed by the continued resupply and Extra-Vehicular Activity (EVA) capabilities of the Space Shuttle. Even prior to the decision to retire the Space Shuttle, it was realized that ISS needed to have its own capability to be able to rapidly repair or replace external hardware without needing to wait for the next cargo resupply mission. As documented in a previous publicatoin5, in 2006 development was started to baseline Extra- Vehicular Activity (EVA, or spacewalk) procedures to replace hardware components whose failure would expose some of the ISS vulnerabilities should a second failure occur. This development work laid the groundwork for the onboard crews and the ground operations and engineering teams to be ready to replace any of this failed hardware. In 2010, this development work was put to the test when one of these pieces of hardware failed. This paper will provide a brief summary of the planning and processes established in the original Contingency EVA development phase. It will then review how those plans and processes were implemented in 2010, highlighting what went well as well as where there were deficiencies between theory and reality. This paper will show that the original approach and analyses, though sound, were not as thorough as they should have been in the realm of planning for next worse failures, for documenting Programmatic approval of key assumptions, and not pursuing sufficient engineering analysis prior to the failure of the hardware. The paper will further highlight the changes made to the Contingency EVA preparation team structure, approach, goals, and the resources allocated to its work after the 2010 events. Finally, the authors will overview the implementation of these updates in addressing failures onboard the ISS in 2012, 2013, and 2014. The successful use of the updated approaches, and the application of the approaches to other spacewalks, will demonstrate the effectiveness of this additional work and make a case for putting significant time and resources into pre-failure planning and analysis for critical hardware items on human-tended spacecraft.

  20. Experiences with Extra-Vehicular Activities in Response to Critical ISS Contingencies

    NASA Technical Reports Server (NTRS)

    Van Cise, E. A.; Kelly, B. J.; Radigan, J. P.; Cranmer, C. W.

    2016-01-01

    The maturation of the International Space Station (ISS) design from the proposed Space Station Freedom to today's current implementation resulted in external hardware redundancy vulnerabilities in the final design. Failure to compensate for or respond to these vulnerabilities could put the ISS in a posture where it could no longer function as a habitable space station. In the first years of ISS assembly, these responses were to largely be addressed by the continued resupply and Extra-Vehicular Activity (EVA) capabilities of the Space Shuttle. Even prior to the decision to retire the Space Shuttle, it was realized that ISS needed to have its own capability to be able to rapidly repair or replace external hardware without needing to wait for the next cargo resupply mission. As documented in a previous publication, in 2006 development was started to baseline Extra-Vehicular Activity (EVA, or spacewalk) procedures to replace hardware components whose failure would expose some of the ISS vulnerabilities should a second failure occur. This development work laid the groundwork for the onboard crews and the ground operations and engineering teams to be ready to replace any of this failed hardware. In 2010, this development work was put to the test when one of these pieces of hardware failed. This paper will provide a brief summary of the planning and processes established in the original Contingency EVA development phase. It will then review how those plans and processes were implemented in 2010, highlighting what went well as well as where there were deficiencies between theory and reality. This paper will show that the original approach and analyses, though sound, were not as thorough as they should have been in the realm of planning for next worse failures, for documenting Programmatic approval of key assumptions, and not pursuing sufficient engineering analysis prior to the failure of the hardware. The paper will further highlight the changes made to the Contingency EVA preparation team structure, approach, goals, and the resources allocated to its work after the 2010 events. Finally, the authors will overview the implementation of these updates in addressing failures onboard the ISS in 2012, 2013, and 2014. The successful use of the updated approaches, and the application of the approaches to other spacewalks, will demonstrate the effectiveness of this additional work and make a case for putting significant time and resources into pre-failure planning and analysis for critical hardware items on human-tended spacecraft.