Sample records for engineering task plan

  1. Understanding of Student Task Interpretation, Design Planning, and Cognitive Strategies during Engineering Design Activities in Grades 9-12. Final Report. Research in Engineering and Technology Education

    ERIC Educational Resources Information Center

    Lawanto, Oenardi

    2011-01-01

    The objective of this study was to describe the task interpretation of students engaged in a design activity and determine the extent to which students translate their understanding of their design task to their planning and cognitive strategies. Twenty-nine students at one Colorado high school participated in this study. Students worked…

  2. Considerations for Using an Incremental Scheduler for Human Exploration Task Scheduling

    NASA Technical Reports Server (NTRS)

    Jaap, John; Phillips, Shaun

    2005-01-01

    As humankind embarks on longer space missions farther from home, the requirements and environments for scheduling the activities performed on these missions are changing. As we begin to prepare for these missions it is appropriate to evaluate the merits and applicability of the different types of scheduling engines. Scheduling engines temporally arrange tasks onto a timeline so that all constraints and objectives are met and resources are not overbooked. Scheduling engines used to schedule space missions fall into three general categories: batch, mixed-initiative, and incremental. This paper presents an assessment of the engine types, a discussion of the impact of human exploration of the moon and Mars on planning and scheduling, and the applicability of the different types of scheduling engines. This paper will pursue the hypothesis that incremental scheduling engines may have a place in the new environment; they have the potential to reduce cost, to improve the satisfaction of those who execute or benefit from a particular timeline (the customers), and to allow astronauts to plan their own tasks.

  3. Engineering Task Plan for the Ultrasonic Inspection of Hanford Double Shell Tanks (DST) FY2000

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    JENSEN, C.E.

    2000-01-10

    This document facilitates the ultrasonic examination of Hanford double-shell tanks. Included are a plan for engineering activities (individual responsibilities), plan for performance demonstration testing, and a plan for field activities (tank inspection). Also included are a Statement of Work for contractor performance of the work and a protocol to be followed should tank flaws that exceed the acceptance criteria be discovered.

  4. Effectiveness of Science Tasks and Plans for Siberian Scholars.

    ERIC Educational Resources Information Center

    Marchuk, G. I.

    1972-01-01

    Science and Technology research plans formulated for the Siberian Department of the U.S.S.R. Academy of Sciences are analyzed in this article to illustrate the tasks of scholars, workers, and engineering and technical personnel in the fulfillment of the 24th party congress resolutions The hypothesis of developing Siberia and the Far East up to the…

  5. A study of mass data storage technology for rocket engine data

    NASA Technical Reports Server (NTRS)

    Ready, John F.; Benser, Earl T.; Fritz, Bernard S.; Nelson, Scott A.; Stauffer, Donald R.; Volna, William M.

    1990-01-01

    The results of a nine month study program on mass data storage technology for rocket engine (especially the Space Shuttle Main Engine) health monitoring and control are summarized. The program had the objective of recommending a candidate mass data storage technology development for rocket engine health monitoring and control and of formulating a project plan and specification for that technology development. The work was divided into three major technical tasks: (1) development of requirements; (2) survey of mass data storage technologies; and (3) definition of a project plan and specification for technology development. The first of these tasks reviewed current data storage technology and developed a prioritized set of requirements for the health monitoring and control applications. The second task included a survey of state-of-the-art and newly developing technologies and a matrix-based ranking of the technologies. It culminated in a recommendation of optical disk technology as the best candidate for technology development. The final task defined a proof-of-concept demonstration, including tasks required to develop, test, analyze, and demonstrate the technology advancement, plus an estimate of the level of effort required. The recommended demonstration emphasizes development of an optical disk system which incorporates an order-of-magnitude increase in writing speed above the current state of the art.

  6. Summary document of tasks performed on the Shuttle-C/NLS contract

    NASA Technical Reports Server (NTRS)

    1993-01-01

    During FY92, USBI performed many programmatic related tasks. These programmatic tasks have been categorized as follows: (1) acquisition; (2) project engineering/program planning; and (3) cost. The reports associated with these tasks follow in paragraphs 1.1.1 through 1.3.3. Proceeding each task report is a brief description of the contents contained within.

  7. Space transportation booster engine configuration study. Addendum: Design definition document

    NASA Technical Reports Server (NTRS)

    1989-01-01

    Gas generator engine characteristics and results of engine configuration refinements are discussed. Updated component mechanical design, performance, and manufacturing information is provided. The results are also provided of ocean recovery studies and various engine integration tasks. The details are provided of the maintenance plan for the Space Transportation Booster Engine.

  8. Advanced Transportation System Studies. Technical Area 3: Alternate Propulsion Subsystem Concepts. Volume 1; Executive Summary

    NASA Technical Reports Server (NTRS)

    Levack, Daniel J. H.

    2000-01-01

    The Alternate Propulsion Subsystem Concepts contract had seven tasks defined that are reported under this contract deliverable. The tasks were: FAA Restart Study, J-2S Restart Study, Propulsion Database Development. SSME Upper Stage Use. CERs for Liquid Propellant Rocket Engines. Advanced Low Cost Engines, and Tripropellant Comparison Study. The two restart studies, F-1A and J-2S, generated program plans for restarting production of each engine. Special emphasis was placed on determining changes to individual parts due to obsolete materials, changes in OSHA and environmental concerns, new processes available, and any configuration changes to the engines. The Propulsion Database Development task developed a database structure and format which is easy to use and modify while also being comprehensive in the level of detail available. The database structure included extensive engine information and allows for parametric data generation for conceptual engine concepts. The SSME Upper Stage Use task examined the changes needed or desirable to use the SSME as an upper stage engine both in a second stage and in a translunar injection stage. The CERs for Liquid Engines task developed qualitative parametric cost estimating relationships at the engine and major subassembly level for estimating development and production costs of chemical propulsion liquid rocket engines. The Advanced Low Cost Engines task examined propulsion systems for SSTO applications including engine concept definition, mission analysis. trade studies. operating point selection, turbomachinery alternatives, life cycle cost, weight definition. and point design conceptual drawings and component design. The task concentrated on bipropellant engines, but also examined tripropellant engines. The Tripropellant Comparison Study task provided an unambiguous comparison among various tripropellant implementation approaches and cycle choices, and then compared them to similarly designed bipropellant engines in the SSTO mission This volume overviews each of the tasks giving its objectives, main results. and conclusions. More detailed Final Task Reports are available on each individual task.

  9. Science and Engineering Technical Assessments (SETA) Program

    NASA Technical Reports Server (NTRS)

    Huy, Frank

    2000-01-01

    This document provides a project plan for the D.N. American response to Modification #1 to Contract Task Order #13 - Program Maintenance and Logistics for the Science and Engineering Technical Assessments (SETA) contract.

  10. Continuing Engineering Studies Series; Monograph No. 3.

    ERIC Educational Resources Information Center

    American Society for Engineering Education, Washington, DC.

    Interest in continuing engineering studies has been growing within the American Society for Engineering Education as well as among educational institutions, industrial organizations, professional association, and governmental agencies. Feeling a national need for uniformity, in 1968 the National Planning Conference authorized a National Task Force…

  11. Nuclear Thermal Propulsion (NTP) Development Activities at the NASA Marshall Space Flight Center - 2006 Accomplishments

    NASA Technical Reports Server (NTRS)

    Ballard, Richard O.

    2007-01-01

    In 2005-06, the Prometheus program funded a number of tasks at the NASA-Marshall Space Flight Center (MSFC) to support development of a Nuclear Thermal Propulsion (NTP) system for future manned exploration missions. These tasks include the following: 1. NTP Design Develop Test & Evaluate (DDT&E) Planning 2. NTP Mission & Systems Analysis / Stage Concepts & Engine Requirements 3. NTP Engine System Trade Space Analysis and Studies 4. NTP Engine Ground Test Facility Assessment 5. Non-Nuclear Environmental Simulator (NTREES) 6. Non-Nuclear Materials Fabrication & Evaluation 7. Multi-Physics TCA Modeling. This presentation is a overview of these tasks and their accomplishments

  12. Incremental Scheduling Engines for Human Exploration of the Cosmos

    NASA Technical Reports Server (NTRS)

    Jaap, John; Phillips, Shaun

    2005-01-01

    As humankind embarks on longer space missions farther from home, the requirements and environments for scheduling the activities performed on these missions are changing. As we begin to prepare for these missions it is appropriate to evaluate the merits and applicability of the different types of scheduling engines. Scheduling engines temporally arrange tasks onto a timeline so that all constraints and objectives are met and resources are not overbooked. Scheduling engines used to schedule space missions fall into three general categories: batch, mixed-initiative, and incremental. This paper presents an assessment of the engine types, a discussion of the impact of human exploration of the moon and Mars on planning and scheduling, and the applicability of the different types of scheduling engines. This paper will pursue the hypothesis that incremental scheduling engines may have a place in the new environment; they have the potential to reduce cost, to improve the satisfaction of those who execute or benefit from a particular timeline (the customers), and to allow astronauts to plan their own tasks and those of their companion robots.

  13. Incremental Scheduling Engines: Cost Savings through Automation

    NASA Technical Reports Server (NTRS)

    Jaap, John; Phillips, Shaun

    2005-01-01

    As humankind embarks on longer space missions farther from home, the requirements and environments for scheduling the activities performed on these missions are changing. As we begin to prepare for these missions it is appropriate to evaluate the merits and applicability of the different types of scheduling engines. Scheduling engines temporally arrange tasks onto a timeline so that all constraints and ob.jectives are met and resources are not over-booked. Scheduling engines used to schedule space missions fall into three general categories: batch, mixed-initiative, and incremental. This paper, presents an assessment of the engine types, a discussion of the impact of human exploration of the moon and Mars on planning and scheduling, and the applicability of the different types of scheduling engines. This paper will pursue the hypothesis that incremental scheduling engines may have a place in the new environment; they have the potential to reduce cost, to improve the satisfaction of those who execute or benefit from a particular timeline (the customers), and to allow astronauts to plan their own tasks and those of their companion robots.

  14. Task 6 -- Advanced turbine systems program conceptual design and product development

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-01-10

    The Allison Engine Company has completed the Task 6 Conceptual Design and Analysis of Phase 2 of the Advanced Turbine System (ATS) contract. At the heart of Allison`s system is an advanced simple cycle gas turbine engine. This engine will incorporate components that ensure the program goals are met. Allison plans to commercialize the ATS demonstrator and market a family of engines incorporating this technology. This family of engines, ranging from 4.9 MW to 12 MW, will be suitable for use in all industrial engine applications, including electric power generation, mechanical drive, and marine propulsion. In the field of electricmore » power generation, the engines will be used for base load, standby, cogeneration, and distributed generation applications.« less

  15. Effects of an Advanced Reactor’s Design, Use of Automation, and Mission on Human Operators

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jeffrey C. Joe; Johanna H. Oxstrand

    The roles, functions, and tasks of the human operator in existing light water nuclear power plants (NPPs) are based on sound nuclear and human factors engineering (HFE) principles, are well defined by the plant’s conduct of operations, and have been validated by years of operating experience. However, advanced NPPs whose engineering designs differ from existing light-water reactors (LWRs) will impose changes on the roles, functions, and tasks of the human operators. The plans to increase the use of automation, reduce staffing levels, and add to the mission of these advanced NPPs will also affect the operator’s roles, functions, and tasks.more » We assert that these factors, which do not appear to have received a lot of attention by the design engineers of advanced NPPs relative to the attention given to conceptual design of these reactors, can have significant risk implications for the operators and overall plant safety if not mitigated appropriately. This paper presents a high-level analysis of a specific advanced NPP and how its engineered design, its plan to use greater levels of automation, and its expanded mission have risk significant implications on operator performance and overall plant safety.« less

  16. Undersea applications of dexterous robotics

    NASA Technical Reports Server (NTRS)

    Gittleman, Mark M.

    1994-01-01

    The revolution and application of dexterous robotics in the undersea energy production industry and how this mature technology has affected planned SSF dexterous robotic tasks are examined. Undersea telerobotics, or Remotely Operated Vehicles (ROV's), have evolved in design and use since the mid-1970s. Originally developed to replace commercial divers for both planned and unplanned tasks, they are now most commonly used to perform planned robotic tasks in all phases of assembly, inspection, and maintenance of undersea structures and installations. To accomplish these tasks, the worksites, the tasks themselves, and the tools are now engineered with both the telerobot's and the diver's capabilities in mind. In many cases, this planning has permitted a reduction in telerobot system complexity and cost. The philosophies and design practices that have resulted in the successful incorporation of telerobotics into the highly competitive and cost conscious offshore production industry have been largely ignored in the space community. Cases where these philosophies have been adopted or may be successfully adopted in the near future are explored.

  17. Becoming an effective clinical engineering or biomedical technology manager.

    PubMed

    Brush, L C

    1992-01-01

    The BMET or CE Supervisor is a technical manager who is close to the actual work of a biomedical or clinical engineering department. The MPTI is a management training tool that has identified differences between the effective and less-effective technical managers. These behaviors or styles can be considered and applied to the clinical engineering and BMET work environments. Effective BMET or CE Supervisors have a management identity. They are both people-oriented and task-oriented. They are good problem-solvers, and will plan and structure the work tasks and environment. When the situation requires a change in plans, however, they can adapt to the new situation easily. If a decision needs to be made that affects the organization, they will check with higher management or peer managers. Less-effective BMET or CE Supervisors will make important decisions alone, without checking with others. They plan and structure tasks and the work environment, but they are less willing to change when faced with a new situation. They are not people-oriented, and their ability to assess social situations is low. Their need for achievement recognition is often too high. The work environment has an effect on how the competence of a manager is perceived. A "one-desk manager" in a small, one-person biomedical engineering department has more autonomy than a CE Supervisor in a large department. Working for a medical device manufacturing firm often requires a greater management identity. An engineering consultant is often a managing specialist, rather than a traditional manager.(ABSTRACT TRUNCATED AT 250 WORDS)

  18. Orbit Transfer Rocket Engine Technology Program: Advanced engine study, task D.1/D.3

    NASA Technical Reports Server (NTRS)

    Martinez, A.; Erickson, C.; Hines, B.

    1986-01-01

    Concepts for space maintainability of OTV engines were examined. An engine design was developed which was driven by space maintenance requirements and by a failure mode and effects (FME) analysis. Modularity within the engine was shown to offer cost benefits and improved space maintenance capabilities. Space operable disconnects were conceptualized for both engine change-out and for module replacement. Through FME mitigation the modules were conceptualized to contain the least reliable and most often replaced engine components. A preliminary space maintenance plan was developed around a controls and condition monitoring system using advanced sensors, controls, and condition monitoring concepts. A complete engine layout was prepared satisfying current vehicle requirements and utilizing projected component advanced technologies. A technology plan for developing the required technology was assembled.

  19. Barrier Beach Breaching from the Lagoon Side, With Reference to Northern California

    DTIC Science & Technology

    2008-01-01

    northwest of San Francisco in Sonoma County . Near the mouth of the Russian River, the coast is punctuated by small pocket beaches separating steep...management plan.” Prepared for U.S. Army Corps of Engineers, San Fran- cisco District and Sonoma County Water Agency, Walnut Creek, CA, 50 p. Goodwin, P...Planning Sonoma County and California Coastal Con- servancy under the direction of the Russian River Estuary Task Interagency Task Force. Phillip

  20. Improving the Simplified Acquisition of Base Engineering Requirements (SABER) Delivery Order Award Process: Results of a Process Improvement Plan

    DTIC Science & Technology

    1991-09-01

    putting all tasks directed towsrds achieving an outcome in aequence. The tasks can be viewed as steps in the process (39:2.3). Using this...improvement opportunity is investigated. A plan is developed, root causes are identified, and solutions are tested and implemented. The process is... solutions , check for actual improvement, and integrate the successful improvements into the process. ?UP 7. Check Improvement Performance. Finally, the

  1. FY 1987 current fiscal year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, informationmore » gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.« less

  2. Advanced Risk Reduction Tool (ARRT) Special Case Study Report: Science and Engineering Technical Assessments (SETA) Program

    NASA Technical Reports Server (NTRS)

    Kirsch, Paul J.; Hayes, Jane; Zelinski, Lillian

    2000-01-01

    This special case study report presents the Science and Engineering Technical Assessments (SETA) team's findings for exploring the correlation between the underlying models of Advanced Risk Reduction Tool (ARRT) relative to how it identifies, estimates, and integrates Independent Verification & Validation (IV&V) activities. The special case study was conducted under the provisions of SETA Contract Task Order (CTO) 15 and the approved technical approach documented in the CTO-15 Modification #1 Task Project Plan.

  3. Studies of planning behavior of aircraft pilots in normal, abnormal, and emergency situations

    NASA Technical Reports Server (NTRS)

    Johannsen, G.; Rouse, W. B.; Hillmann, K.

    1981-01-01

    A methodology for the study of human planning behavior in complex dynamic systems is presented and applied to the study of aircraft pilot behavior in normal, abnormal and emergency situations. The method measures the depth of planning, that is the level of detail employed with respect to a specific task, according to responses to a verbal questionnaire, and compares planning depth with variables relating to time, task criticality and the probability of increased task difficulty. In two series of experiments, depth of planning was measured on a five- or ten-point scale during various phases of flight in a HFB-320 simulator under normal flight conditions, abnormal scenarios involving temporary runway closure due to snow removal or temporary CAT-III conditions due to a dense fog, and emergency scenarios involving engine shut-down or hydraulic pressure loss. Results reveal a dichotomy between event-driven and time-driven planning, different effects of automation in abnormal and emergency scenarios and a low correlation between depth of planning and workload or flight performance.

  4. Solar power satellite system definition study, phase 2.

    NASA Technical Reports Server (NTRS)

    1979-01-01

    A program plan for the Solar Power Satellite Program is presented. The plan includes research, development, and evaluation phase, engineering and development and cost verification phase, prototype construction, and commercialization. Cost estimates and task requirements are given for the following technology areas: (1) solar arrays; (2) thermal engines and thermal systems; (3) power transmission (to earth); (4) large space structures; (5) materials technology; (6) system control; (7) space construction; (8) space transportation; (9) power distribution, and space environment effects.

  5. Consolidated View on Space Software Engineering Problems - An Empirical Study

    NASA Astrophysics Data System (ADS)

    Silva, N.; Vieira, M.; Ricci, D.; Cotroneo, D.

    2015-09-01

    Independent software verification and validation (ISVV) has been a key process for engineering quality assessment for decades, and is considered in several international standards. The “European Space Agency (ESA) ISVV Guide” is used for the European Space market to drive the ISVV tasks and plans, and to select applicable tasks and techniques. Software artefacts have room for improvement due to the amount if issues found during ISVV tasks. This article presents the analysis of the results of a large set of ISVV issues originated from three different ESA missions-amounting to more than 1000 issues. The study presents the main types, triggers and impacts related to the ISVV issues found and sets the path for a global software engineering improvement based on the most common deficiencies identified for space projects.

  6. Professional Role Confidence and Gendered Persistence in Engineering

    ERIC Educational Resources Information Center

    Cech, Erin; Rubineau, Brian; Silbey, Susan; Seron, Caroll

    2011-01-01

    Social psychological research on gendered persistence in science, technology, engineering, and mathematics (STEM) professions is dominated by two explanations: women leave because they perceive their family plans to be at odds with demands of STEM careers, and women leave due to low self-assessment of their skills in STEM's intellectual tasks, net…

  7. Trading Places: Measurement and Analysis in the Eyes of the Acquirer and the Supplier

    DTIC Science & Technology

    2004-03-01

    task completed Days late = actual start - plan start if task in progress • Reference models: CMMI, SA CMM, IEEE/ ISO 12207 • Leverage CMMI capabilities...IEEE/ ISO 12207 • Leverage CMMI capabilities built in engineering: MA, REQM, RD, CAR • Aim for CMMI capability in selected PAs: SAM, DAR, RSK, PP/PMC

  8. Selenide isotope generator for the Galileo mission. Reliability program plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1978-10-01

    The reliability program plan for the Selenide Isotope Generator (SIG) program is presented. It delineates the specific tasks that will be accomplished by Teledyne Energy Systems and its suppliers during design, development, fabrication and test of deliverable Radioisotopic Thermoelectric Generators (RTG), Electrical Heated Thermoelectric Generators (ETG) and associated Ground Support Equipment (GSE). The Plan is formulated in general accordance with procedures specified in DOE Reliability Engineering Program Requirements Publication No. SNS-2, dated June 17, 1974. The Reliability Program Plan presented herein defines the total reliability effort without further reference to Government Specifications. The reliability tasks to be accomplished are delineatedmore » herein and become the basis for contract compliance to the extent specified in the SIG contract Statement of Work.« less

  9. PROGRAM ASTEC (ADVANCED SOLAR TURBO ELECTRIC CONCEPT). PART IV. SOLAR COLLECTOR DEVELOPMENT SUPPORT TASKS. VOL. VII. ENGINEERING DEVELOPMENT GROUND TEST PLAN FOR THE ASTEC SOLAR ENERGY COLLECTOR.

    DTIC Science & Technology

    optical, and structural integrity of the full scale ASTEC solar collector before further development proceeds. This document specifies these initial...engineering ground tests recommended for testing petals and other critical components of the ASTEC collector. It defines the requirements and

  10. Changing America: The New Face of Science and Engineering. Final Report.

    ERIC Educational Resources Information Center

    Task Force on Women, Minorities, and the Handicapped in Science and Technology, Washington, DC.

    The Task Force on Women, Minorities, and the Handicapped in Science and Technology was established by the U.S. Congress in Public Law 99-383 with the purpose of developing a long-range plan for broadening participation in science and engineering. Public hearings were held in Albuquerque (New Mexico), Atlanta (Georgia), Baltimore (Maryland), Boston…

  11. Software Engineering Improvement Plan

    NASA Technical Reports Server (NTRS)

    2006-01-01

    In performance of this task order, bd Systems personnel provided support to the Flight Software Branch and the Software Working Group through multiple tasks related to software engineering improvement and to activities of the independent Technical Authority (iTA) Discipline Technical Warrant Holder (DTWH) for software engineering. To ensure that the products, comments, and recommendations complied with customer requirements and the statement of work, bd Systems personnel maintained close coordination with the customer. These personnel performed work in areas such as update of agency requirements and directives database, software effort estimation, software problem reports, a web-based process asset library, miscellaneous documentation review, software system requirements, issue tracking software survey, systems engineering NPR, and project-related reviews. This report contains a summary of the work performed and the accomplishments in each of these areas.

  12. DE-EE0006714 Final Report-Project Icebreaker™

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wagner, Lorry; Karpinski, David; Nagusky, Beth

    Project Icebreaker, a 20 Megawatt offshore wind project 8 miles north of Cleveland, OH in Lake Erie, has been under development by the Lake Erie Energy Development Corporation since 2009. Significant development efforts were completed prior to the award of DE-EE0006714 (December 2014). This report describes the status of the work performed under award DE-EE0006714. The work was organized into several categories or tasks. The report presents the status of that work in each of eleven (11) main tasks: 1) State and Federal Permits; 2) Mono Bucket Foundation Engineering; 3) Construction and Installation Engineering; 4) Cable Route Survey; 5) Electricalmore » System Design; 6) Power Off-take; 7) Project Costs and Risk Management; 8) Operations and Maintenance Planning; 9) Domestic Supply Chain Development; 10) Instrumentation Planning; and 11) Department of Energy Review.« less

  13. Operations planning and analysis handbook for NASA/MSFC phase B development projects

    NASA Technical Reports Server (NTRS)

    Batson, Robert C.

    1986-01-01

    Current operations planning and analysis practices on NASA/MSFC Phase B projects were investigated with the objectives of (1) formalizing these practices into a handbook and (2) suggesting improvements. The study focused on how Science and Engineering (S&E) Operational Personnel support Program Development (PD) Task Teams. The intimate relationship between systems engineering and operations analysis was examined. Methods identified for use by operations analysts during Phase B include functional analysis, interface analysis methods to calculate/allocate such criteria as reliability, Maintainability, and operations and support cost.

  14. Cooperative Multi-Agent Mobile Sensor Platforms for Jet Engine Inspection: Concept and Implementation

    NASA Technical Reports Server (NTRS)

    Litt, Jonathan S.; Wong, Edmond; Krasowski, Michael J.; Greer, Lawrence C.

    2003-01-01

    Cooperative behavior algorithms utilizing swarm intelligence are being developed for mobile sensor platforms to inspect jet engines on-wing. Experiments are planned in which several relatively simple autonomous platforms will work together in a coordinated fashion to carry out complex maintenance-type tasks within the constrained working environment modeled on the interior of a turbofan engine. The algorithms will emphasize distribution of the tasks among multiple units; they will be scalable and flexible so that units may be added in the future; and will be designed to operate on an individual unit level to produce the desired global effect. This proof of concept demonstration will validate the algorithms and provide justification for further miniaturization and specialization of the hardware toward the true application of on-wing in situ turbine engine maintenance.

  15. Supersonics--Airport Noise

    NASA Technical Reports Server (NTRS)

    Bridges, James

    2007-01-01

    At this, the first year-end meeting of the Fundamental Aeronautics Program, an overview of the Airport Noise discipline of the Supersonics Project leads the presentation of technical plans and achievements in this area of the Project. The overview starts by defining the Technical Challenges targeted by Airport Noise efforts, and the Approaches planned to meet these challenges. These are fleshed out in Elements, namely Prediction, Diagnostics, and Engineering, and broken down into Tasks. The Tasks level is where individual researchers' work is defined and from whence the technical presentations to follow this presentation come. This overview also presents the Milestones accomplished to date and to be completed in the next year. Finally, the NASA Research Announcement cooperative agreement activities are covered and tied to the Tasks and Milestones.

  16. Orbit Transfer Rocket Engine Technology - 7.5K-LB Thrust Rocket Engine Preliminary Design

    DTIC Science & Technology

    1993-10-15

    AND SPACE ADMINISTRATION October, 1993 r W NASA-Lewis Research Center Cleveland, Ohio 44135 94-08572 Contract Nc. NAS3-23773 Task B.7 and D.5 4I3’OA4 3 ...APPROACH 1 4.0 SUMMARY OF ACCOMPLISHMENTS 2 5.0 TECHNICAL DISCUSSIONS 3 6.0 PROGRAM WORK PLAN 5 6.1 Engine Analysis 5 6.2 Component Analysis 15 6.2.1...FIGURES Page Figure 1 Advanced Engine Studv Logic Diagram 4 Figure 2 Design Point Engine Pertormance at Full Thrust & MR = 6.0 7 Figure 3 Off-Design

  17. Productivity increase through implementation of CAD/CAE workstation

    NASA Technical Reports Server (NTRS)

    Bromley, L. K.

    1985-01-01

    The tracking and communication division computer aided design/computer aided engineering system is now operational. The system is utilized in an effort to automate certain tasks that were previously performed manually. These tasks include detailed test configuration diagrams of systems under certification test in the ESTL, floorplan layouts of future planned laboratory reconfigurations, and other graphical documentation of division activities. The significant time savings achieved with this CAD/CAE system are examined: (1) input of drawings and diagrams; (2) editing of initial drawings; (3) accessibility of the data; and (4) added versatility. It is shown that the Applicon CAD/CAE system, with its ease of input and editing, the accessibility of data, and its added versatility, has made more efficient many of the necessary but often time-consuming tasks associated with engineering design and testing.

  18. Feasibility Investigation on the Development of a Structural Damage Diagnostic and Monitoring System for Rocket Engines

    NASA Technical Reports Server (NTRS)

    Shen, Ji Y.; Sharpe, Lonnie, Jr.

    1998-01-01

    The research activity for this project is mainly to investigate the necessity and feasibility to develop a structural health monitoring system for rocket engines, and to carry out a research plan for further development of the system. More than one hundred technical papers have been searched and reviewed during the period. We concluded after this investigation that adding a new module in NASA's existing automated diagnostic system to monitor the healthy condition of rocket engine structures is a crucial task, and it's possible to develop such a system based upon the vibrational-based nondestructive damage assessment techniques. A number of such techniques have been introduced. Their advantages and disadvantages are also discussed. A global research plan has been figured out. As the first step of the overall research plan, a proposal for the next fiscal year has been submitted.

  19. Task Force on Women, Minorities and the Handicapped in Science and Technology: Executive Session. Report of the Proceedings (Atlanta, Georgia, March 3, 1988).

    ERIC Educational Resources Information Center

    Task Force on Women, Minorities, and the Handicapped in Science and Technology, Washington, DC.

    The Task Force on Women, Minorities, and the Handicapped in Science and Technology was established by the U.S. Congress in Public Law 99-383 with the purpose of developing a long-range plan for broadening participation in science and engineering. Public hearings were held in Albuquerque (New Mexico), Atlanta (Georgia), Baltimore (Maryland), Boston…

  20. Task Force on Women, Minorities and the Handicapped in Science and Technology: Public Hearing. Report of the Proceedings (Kansas City, Missouri, December 1, 1987).

    ERIC Educational Resources Information Center

    Task Force on Women, Minorities, and the Handicapped in Science and Technology, Washington, DC.

    The Task Force on Women, Minorities, and the Handicapped in Science and Technology was established by the U.S. Congress in Public Law 99-383 with the purpose of developing a long-range plan for broadening participation in science and engineering. Public hearings were held in Albuquerque (New Mexico), Atlanta (Georgia), Baltimore (Maryland), Boston…

  1. Task Force on Women, Minorities and the Handicapped in Science and Technology: Public Hearing. Report of the Proceedings (Albuquerque, New Mexico, September 22, 1987).

    ERIC Educational Resources Information Center

    Task Force on Women, Minorities, and the Handicapped in Science and Technology, Washington, DC.

    The Task Force on Women, Minorities, and the Handicapped in Science and Technology was established by the U.S. Congress in Public Law 99-383 with the purpose of developing a long-range plan for broadening participation in science and engineering. Public hearings were held in Albuquerque (New Mexico), Atlanta (Georgia), Baltimore (Maryland), Boston…

  2. Task Force on Women, Minorities and the Handicapped in Science and Technology: Public Hearing. Report of the Proceedings (Baltimore, Maryland, May 4, 1988).

    ERIC Educational Resources Information Center

    Task Force on Women, Minorities, and the Handicapped in Science and Technology, Washington, DC.

    The Task Force on Women, Minorities, and the Handicapped in Science and Technology was established by the U.S. Congress in Public Law 99-383 with the purpose of developing a long-range plan for broadening participation in science and engineering. Public hearings were held in Albuquerque (New Mexico), Atlanta (Georgia), Baltimore (Maryland), Boston…

  3. Task Force on Women, Minorities and the Handicapped in Science and Technology: Executive Session. Report of the Proceedings (Washington, D.C., May 24, 1988).

    ERIC Educational Resources Information Center

    Task Force on Women, Minorities, and the Handicapped in Science and Technology, Washington, DC.

    The Task Force on Women, Minorities, and the Handicapped in Science and Technology was established by the U.S. Congress in Public Law 99-383 with the purpose of developing a long-range plan for broadening participation in science and engineering. Public hearings were held in Albuquerque (New Mexico), Atlanta (Georgia), Baltimore (Maryland), Boston…

  4. Task Force on Women, Minorities and the Handicapped in Science and Technology: Public Hearing. Report of the Proceedings (Cambridge, Massachusetts, April 7, 1988).

    ERIC Educational Resources Information Center

    Task Force on Women, Minorities, and the Handicapped in Science and Technology, Washington, DC.

    The Task Force on Women, Minorities, and the Handicapped in Science and Technology was established by the U.S. Congress in Public Law 99-383 with the purpose of developing a long-range plan for broadening participation in science and engineering. Public hearings were held in Albuquerque (New Mexico), Atlanta (Georgia), Baltimore (Maryland), Boston…

  5. Task Force on Women, Minorities and the Handicapped in Science and Technology: Public Meeting. Report of the Proceedings (Albuquerque, New Mexico, September 27, 1987).

    ERIC Educational Resources Information Center

    Task Force on Women, Minorities, and the Handicapped in Science and Technology, Washington, DC.

    The Task Force on Women, Minorities, and the Handicapped in Science and Technology was established by the U.S. Congress in Public Law 99-383 with the purpose of developing a long-range plan for broadening participation in science and engineering. Public hearings were held in Albuquerque (New Mexico), Atlanta (Georgia), Baltimore (Maryland), Boston…

  6. Task Force on Women, Minorities and the Handicapped in Science and Technology: Executive Session. Report of the Proceedings (Cambridge, Massachusetts, April 8, 1988).

    ERIC Educational Resources Information Center

    Task Force on Women, Minorities, and the Handicapped in Science and Technology, Washington, DC.

    The Task Force on Women, Minorities, and the Handicapped in Science and Technology was established by the U.S. Congress in Public Law 99-383 with the purpose of developing a long-range plan for broadening participation in science and engineering. Public hearings were held in Albuquerque (New Mexico), Atlanta (Georgia), Baltimore (Maryland), Boston…

  7. Follow-on Assessment of LightSquared Ancillary Terrestrial Component Effects on GPS Receivers

    DOT National Transportation Integrated Search

    2012-01-18

    The National Executive Committee (EXCOM) for Space-Based Positioning, Navigation, and Timing (PNT) tasked the National Space-Based PNT Systems Engineering Forum (NPEF) to conduct an assessment of the effects of LightSquareds planned deployment of ...

  8. Affordable Development and Demonstration of a Small NTR Engine and Stage: How Small is Big Enough?

    NASA Technical Reports Server (NTRS)

    Borowski, S. K.; Sefcik, R. J.; Fittje, J. E.; McCurdy, D. R.; Qualls, A. L.; Schnitzler, B. G.; Werner, J.; Weitzberg, A.; Joyner, C. R.

    2015-01-01

    In FY11, NASA formulated a plan for Nuclear Thermal Propulsion (NTP) development that included Foundational Technology Development followed by system-level Technology Demonstrations The ongoing NTP project, funded by NASAs Advanced Exploration Systems (AES) program, is focused on Foundational Technology Development and includes 5 key task activities:(1) Fuel element fabrication and non-nuclear validation testing of heritage fuel options;(2) Engine conceptual design;(3) Mission analysis and engine requirements definition;(4) Identification of affordable options for ground testing; and(5) Formulation of an affordable and sustainable NTP development program Performance parameters for Point of Departure designs for a small criticality-limited and full size 25 klbf-class engine were developed during FYs 13-14 using heritage fuel element designs for both RoverNERVA Graphite Composite (GC) and Ceramic Metal (Cermet) fuel forms To focus the fuel development effort and maximize use of its resources, the AES program decided, in FY14, that a leader-follower down selection between GC and cermet fuel was required An Independent Review Panel (IRP) was convened by NASA and tasked with reviewing the available fuel data and making a recommendation to NASA. In February 2015, the IRP recommended and the AES program endorsed GC as the leader fuel In FY14, a preliminary development schedule DDTE plan was produced by GRC, DOE industry for the AES program. Assumptions, considerations and key task activities are presented here Two small (7.5 and 16.5 klbf) engine sizes were considered for ground and flight technology demonstration within a 10-year timeframe; their ability to support future human exploration missions was also examined and a recommendation on a preferred size is provided.

  9. Enabling New Operations Concepts for Lunar and Mars Exploration

    NASA Astrophysics Data System (ADS)

    Jaap, John; Maxwell, Theresa

    2005-02-01

    The planning and scheduling of human space activities is an expensive and time-consuming task that seldom provides the crew with the control, flexibility, or insight that they need. During the past thirty years, scheduling software has seen only incremental improvements; however, software limitations continue to prevent even evolutionary improvements in the ``operations concept'' that is used for human space missions. Space missions are planned on the ground long before they are executed in space, and the crew has little input or influence on the schedule. In recent years the crew has been presented with a ``job jar'' of activities that they can do whenever they have time, but the contents of the jar is limited to tasks that do not use scarce shared resources and do not have external timing constraints. Consequently, the crew has no control over the schedule of the majority of their own tasks. As humans venture farther from earth for longer durations, it will become imperative that they have the ability to plan and schedule not only their own activities, but also the unattended activities of the systems, equipment, and robots on the journey with them. Significant software breakthroughs are required to enable the change in the operations concept. The crew does not have the time to build or modify the schedule by hand. They only need to issue a request to schedule a task and the system should automatically do the rest. Of course, the crew should not be required to build the complete schedule. Controllers on the ground should contribute the models and schedules where they have the better knowledge. The system must allow multiple simultaneous users, some on earth and some in space. The Mission Operations Laboratory at NASA's Marshall Space Flight Center has been researching and prototyping a modeling schema, scheduling engine, and system architecture that can enable the needed paradigm shift - it can make the crew autonomous. This schema and engine can be the core of a planning and scheduling system that would enable multiple planners, some on the earth and some in space, to build one integrated timeline. Its modeling schema can capture all the task requirements; its scheduling engine can build the schedule automatically; and its architecture can allow those (on earth and in space) with the best knowledge of the tasks to schedule them. This paper describes the enabling technology and proposes an operations concept for astronauts autonomously scheduling their activities and the activities around them.

  10. Enabling New Operations Concepts for Lunar and Mars Exploration

    NASA Technical Reports Server (NTRS)

    Jaap, John; Maxwell, Theresa

    2005-01-01

    The planning and scheduling of human space activities is an expensive and time-consuming task that seldom provides the crew with the control, flexibility, or insight that they need. During the past thirty years, scheduling software has seen only incremental improvements; however, software limitations continue to prevent even evolutionary improvements in the operations concept that is used for human space missions. Space missions are planned on the ground long before they are executed in space, and the crew has little input or influence on the schedule. In recent years the crew has been presented with a job jar of activities that they can do whenever they have time, but the contents of the jar is limited to tasks that do not use scarce shared resources and do not have external timing constraints. Consequently, the crew has no control over the schedule of the majority of their own tasks. As humans venture farther from earth for longer durations, it will become imperative that they have the ability to plan and schedule not only their own activities, but also the unattended activities of the systems, equipment, and robots on the journey with them. Significant software breakthroughs are required to enable the change in the operations concept. The crew does not have the time to build or modify the schedule by hand. They only need to issue a request to schedule a task and the system should automatically do the rest. Of course, the crew should not be required to build the complete schedule. Controllers on the ground should contribute the models and schedules where they have the better knowledge. The system must allow multiple simultaneous users, some on earth and some in space. The Mission Operations Laboratory at NASA's Marshall Space flight Center has been researching and prototyping a modeling schema, scheduling engine, and system architecture that can enable the needed paradigm shift - it can make the crew autonomous. This schema and engine can be the core of a planning and scheduling system that would enable multiple planners, some on the earth and some in space, to build one integrated timeline. Its modeling schema can capture all the task requirements; its scheduling engine can build the schedule automatically, and its architecture can allow those (on earth and in space) with the best knowledge of the tasks to schedule them. This paper describes the enabling technology and proposes an operations concept for astronauts autonomously scheduling their activities and the activities around them.

  11. 2005 8th Annual Systems Engineering Conference. Volume 1, Tuesday

    DTIC Science & Technology

    2005-10-27

    Services NCES Discovery Services Federated Search Denotes interface Service NCCP Oktoberfest 2004 101 Task: Global Strike Mission Planning NCCP Oktoberfest...Enterprise Service Management Security Services NCES Discovery Services Federated Search Service Test, cert and accreditation needs to be focused on small

  12. LST CGM Generator and Viewer Final Report CRADA No. TSB-1558-98

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vickers, Don; Larson, Don

    The purpose of this project was to jointly develop and test a software plug-in that would convert native Pro /ENGINEER digital engineering drawings to Computer Graphics Metafile (CGM) format. If it was not feasible to convert the Pro/ENGINEER files, we planned to develop and test a similar conversion of native AutoCAD engineering drawings to CGM. CGM viewer plug-ins were developed as needed. There were four main tasks in this project: 1. Requirements for CGM Plug-in 2. Product Evaluation 3. Product Development Feasibility Study 4. Developing a "Plug-In" Application.

  13. Human Factors Virtual Analysis Techniques for NASA's Space Launch System Ground Support using MSFC's Virtual Environments Lab (VEL)

    NASA Technical Reports Server (NTRS)

    Searcy, Brittani

    2017-01-01

    Using virtual environments to assess complex large scale human tasks provides timely and cost effective results to evaluate designs and to reduce operational risks during assembly and integration of the Space Launch System (SLS). NASA's Marshall Space Flight Center (MSFC) uses a suite of tools to conduct integrated virtual analysis during the design phase of the SLS Program. Siemens Jack is a simulation tool that allows engineers to analyze human interaction with CAD designs by placing a digital human model into the environment to test different scenarios and assess the design's compliance to human factors requirements. Engineers at MSFC are using Jack in conjunction with motion capture and virtual reality systems in MSFC's Virtual Environments Lab (VEL). The VEL provides additional capability beyond standalone Jack to record and analyze a person performing a planned task to assemble the SLS at Kennedy Space Center (KSC). The VEL integrates Vicon Blade motion capture system, Siemens Jack, Oculus Rift, and other virtual tools to perform human factors assessments. By using motion capture and virtual reality, a more accurate breakdown and understanding of how an operator will perform a task can be gained. By virtual analysis, engineers are able to determine if a specific task is capable of being safely performed by both a 5% (approx. 5ft) female and a 95% (approx. 6'1) male. In addition, the analysis will help identify any tools or other accommodations that may to help complete the task. These assessments are critical for the safety of ground support engineers and keeping launch operations on schedule. Motion capture allows engineers to save and examine human movements on a frame by frame basis, while virtual reality gives the actor (person performing a task in the VEL) an immersive view of the task environment. This presentation will discuss the need of human factors for SLS and the benefits of analyzing tasks in NASA MSFC's VEL.

  14. Public Hearing: Report of the Proceedings of a Public Hearing of the Task Force on Women, Minorities and the Handicapped in Science and Technology (Atlanta, Georgia, March 2, 1988).

    ERIC Educational Resources Information Center

    Task Force on Women, Minorities, and the Handicapped in Science and Technology, Washington, DC.

    The Task Force on Women, Minorities, and the Handicapped in Science and Technology was established by the U.S. Congress in Public Law 99-383 with the purpose of developing a long-range plan for broadening participation in science and engineering. Public hearings were held in Albuquerque (New Mexico), Atlanta (Georgia), Baltimore (Maryland), Boston…

  15. Human-Automation Integration: Principle and Method for Design and Evaluation

    NASA Technical Reports Server (NTRS)

    Billman, Dorrit; Feary, Michael

    2012-01-01

    Future space missions will increasingly depend on integration of complex engineered systems with their human operators. It is important to ensure that the systems that are designed and developed do a good job of supporting the needs of the work domain. Our research investigates methods for needs analysis. We included analysis of work products (plans for regulation of the space station) as well as work processes (tasks using current software), in a case study of Attitude Determination and Control Officers (ADCO) planning work. This allows comparing how well different designs match the structure of the work to be supported. Redesigned planning software that better matches the structure of work was developed and experimentally assessed. The new prototype enabled substantially faster and more accurate performance in plan revision tasks. This success suggests the approach to needs assessment and use in design and evaluation is promising, and merits investigatation in future research.

  16. First-of-A-Kind Control Room Modernization Project Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Thomas, Kenneth David

    This project plan describes a comprehensive approach to the design of an end-state concept for a modernized control room for Palo Verde. It describes the collaboration arrangement between the DOE LWRS Program Control Room Modernization Project and the APS Palo Verde Nuclear Generating Station. It further describes the role of other collaborators, including the Institute for Energy Technology (IFE) and the Electric Power Research Institute (EPRI). It combines advanced tools, methodologies, and facilities to enable a science-based approach to the validation of applicable engineering and human factors principles for nuclear plant control rooms. It addresses the required project results andmore » documentation to demonstrate compliance with regulatory requirements. It describes the project tasks that will be conducted in the project, and the deliverable reports that will be developed through these tasks. This project plan will be updated as new tasks are added and as project milestones are completed. It will serve as an ongoing description on the project both for project participants and for industry stakeholders.« less

  17. Space station System Engineering and Integration (SE and I). Volume 2: Study results

    NASA Technical Reports Server (NTRS)

    1987-01-01

    A summary of significant study results that are products of the Phase B conceptual design task are contained. Major elements are addressed. Study results applicable to each major element or area of design are summarized and included where appropriate. Areas addressed include: system engineering and integration; customer accommodations; test and program verification; product assurance; conceptual design; operations and planning; technical and management information system (TMIS); and advanced development.

  18. Benchmarking the Naval Systems Engineering Guide Against the Industry Standards for Systems Engineering

    DTIC Science & Technology

    2012-09-01

    Maintenance activities, as this will allow new methods and Operational changes to be made if necessary (i.e., more downtime than originally planned or...increased complexity of military hardware, both new systems and their integration with legacy systems, requires a correspondingly increased expertise in...available Little of that added weight involves weapons or armor that actually is becoming lighter as new technologies and composites are utilized (Task

  19. NASA Engineering Safety Center NASA Aerospace Flight Battery Systems Working Group 2007 Proactive Task Status

    NASA Technical Reports Server (NTRS)

    Manzo, Michelle A.

    2007-01-01

    In 2007, the NASA Engineering Safety Center (NESC) chartered the NASA Aerospace Flight Battery Systems Working Group to bring forth and address critical battery-related performance/manufacturing issues for NASA and the aerospace community. A suite of tasks identifying and addressing issues related to Ni-H2 and Li-ion battery chemistries was submitted and selected for implementation. The current NESC funded are: (1) Wet Life of Ni-H2 Batteries (2) Binding Procurement (3) NASA Lithium-Ion Battery Guidelines (3a) Li-Ion Performance Assessment (3b) Li-Ion Guidelines Document (3b-i) Assessment of Applicability of Pouch Cells for Aerospace Missions (3b-ii) High Voltage Risk Assessment (3b-iii) Safe Charge Rates for Li-Ion Cells (4) Availability of Source Material for Li-Ion Cells (5) NASA Aerospace Battery Workshop This presentation provides a brief overview of the tasks in the 2007 plan and serves as an introduction to more detailed discussions on each of the specific tasks.

  20. Communications System Architecture Development for Air Traffic Management and Aviation Weather Information Dissemination

    NASA Technical Reports Server (NTRS)

    Gallagher, Seana; Olson, Matt; Blythe, Doug; Heletz, Jacob; Hamilton, Griff; Kolb, Bill; Homans, Al; Zemrowski, Ken; Decker, Steve; Tegge, Cindy

    2000-01-01

    This document is the NASA AATT Task Order 24 Final Report. NASA Research Task Order 24 calls for the development of eleven distinct task reports. Each task was a necessary exercise in the development of comprehensive communications systems architecture (CSA) for air traffic management and aviation weather information dissemination for 2015, the definition of the interim architecture for 2007, and the transition plan to achieve the desired End State. The eleven tasks are summarized along with the associated Task Order reference. The output of each task was an individual task report. The task reports that make up the main body of this document include Task 5, Task 6, Task 7, Task 8, Task 10, and Task 11. The other tasks provide the supporting detail used in the development of the architecture. These reports are included in the appendices. The detailed user needs, functional communications requirements and engineering requirements associated with Tasks 1, 2, and 3 have been put into a relational database and are provided electronically.

  1. Motor Timing Deficits in Sequential Movements in Parkinson Disease Are Related to Action Planning: A Motor Imagery Study

    PubMed Central

    Avanzino, Laura; Pelosin, Elisa; Martino, Davide; Abbruzzese, Giovanni

    2013-01-01

    Timing of sequential movements is altered in Parkinson disease (PD). Whether timing deficits in internally generated sequential movements in PD depends also on difficulties in motor planning, rather than merely on a defective ability to materially perform the planned movement is still undefined. To unveil this issue, we adopted a modified version of an established test for motor timing, i.e. the synchronization–continuation paradigm, by introducing a motor imagery task. Motor imagery is thought to involve mainly processes of movement preparation, with reduced involvement of end-stage movement execution-related processes. Fourteen patients with PD and twelve matched healthy volunteers were asked to tap in synchrony with a metronome cue (SYNC) and then, when the tone stopped, to keep tapping, trying to maintain the same rhythm (CONT-EXE) or to imagine tapping at the same rhythm, rather than actually performing it (CONT-MI). We tested both a sub-second and a supra-second inter-stimulus interval between the cues. Performance was recorded using a sensor-engineered glove and analyzed measuring the temporal error and the interval reproduction accuracy index. PD patients were less accurate than healthy subjects in the supra-second time reproduction task when performing both continuation tasks (CONT-MI and CONT-EXE), whereas no difference was detected in the synchronization task and on all tasks involving a sub-second interval. Our findings suggest that PD patients exhibit a selective deficit in motor timing for sequential movements that are separated by a supra-second interval and that this deficit may be explained by a defect of motor planning. Further, we propose that difficulties in motor planning are of a sufficient degree of severity in PD to affect also the motor performance in the supra-second time reproduction task. PMID:24086534

  2. MSFC personnel management tasks: Recruitment and orientation of new employees

    NASA Technical Reports Server (NTRS)

    Brindley, T. A.

    1980-01-01

    In order to encourage highly motivated young students to learn about NASA and consider it for a career, a formal program is to be initiated whereby selected students can work on a voluntary basis at Marshall Space Flight Center (MSFC). The first task was to develop the working plan and procedures for this program, called Student Volunteer Service Program, in the writing of MSFC official guidelines, the Marshall Management Instruction (the MMI) which is a binding document that defines policy and establishes procedures and guidelines. Particular considerations written into the MMI after numerous consultations, interviews, and discussions about a satisfactory policy, include: arrangements to be made between the student, the school authorities, and concerned MSFC employees; management of the work assignments; and procedures for the student's welfare and safety. The second task was the development of a recruitment brochure for the attraction of new employees, especially scientists and engineers. The third task assigned was to develop a plan called Orientation of New Employees.

  3. The TAME Project: Towards improvement-oriented software environments

    NASA Technical Reports Server (NTRS)

    Basili, Victor R.; Rombach, H. Dieter

    1988-01-01

    Experience from a dozen years of analyzing software engineering processes and products is summarized as a set of software engineering and measurement principles that argue for software engineering process models that integrate sound planning and analysis into the construction process. In the TAME (Tailoring A Measurement Environment) project at the University of Maryland, such an improvement-oriented software engineering process model was developed that uses the goal/question/metric paradigm to integrate the constructive and analytic aspects of software development. The model provides a mechanism for formalizing the characterization and planning tasks, controlling and improving projects based on quantitative analysis, learning in a deeper and more systematic way about the software process and product, and feeding the appropriate experience back into the current and future projects. The TAME system is an instantiation of the TAME software engineering process model as an ISEE (integrated software engineering environment). The first in a series of TAME system prototypes has been developed. An assessment of experience with this first limited prototype is presented including a reassessment of its initial architecture.

  4. Evaluation of advanced propulsion options for the next manned transportation system: Propulsion evolution study

    NASA Technical Reports Server (NTRS)

    Spears, L. T.; Kramer, R. D.

    1990-01-01

    The objectives were to examine launch vehicle applications and propulsion requirements for potential future manned space transportation systems and to support planning toward the evolution of Space Shuttle Main Engine (SSME) and Space Transportation Main Engine (STME) engines beyond their current or initial launch vehicle applications. As a basis for examinations of potential future manned launch vehicle applications, we used three classes of manned space transportation concepts currently under study: Space Transportation System Evolution, Personal Launch System (PLS), and Advanced Manned Launch System (AMLS). Tasks included studies of launch vehicle applications and requirements for hydrogen-oxygen rocket engines; the development of suggestions for STME engine evolution beyond the mid-1990's; the development of suggestions for STME evolution beyond the Advanced Launch System (ALS) application; the study of booster propulsion options, including LOX-Hydrocarbon options; the analysis of the prospects and requirements for utilization of a single engine configuration over the full range of vehicle applications, including manned vehicles plus ALS and Shuttle C; and a brief review of on-going and planned LOX-Hydrogen propulsion technology activities.

  5. Marshall Space Flight Center Ground Systems Development and Integration

    NASA Technical Reports Server (NTRS)

    Wade, Gina

    2016-01-01

    Ground Systems Development and Integration performs a variety of tasks in support of the Mission Operations Laboratory (MOL) and other Center and Agency projects. These tasks include various systems engineering processes such as performing system requirements development, system architecture design, integration, verification and validation, software development, and sustaining engineering of mission operations systems that has evolved the Huntsville Operations Support Center (HOSC) into a leader in remote operations for current and future NASA space projects. The group is also responsible for developing and managing telemetry and command configuration and calibration databases. Personnel are responsible for maintaining and enhancing their disciplinary skills in the areas of project management, software engineering, software development, software process improvement, telecommunications, networking, and systems management. Domain expertise in the ground systems area is also maintained and includes detailed proficiency in the areas of real-time telemetry systems, command systems, voice, video, data networks, and mission planning systems.

  6. Tailoring Small IT Projects in the Project Planning Phase

    ERIC Educational Resources Information Center

    Mulhearn, Michael F.

    2011-01-01

    Project management (PM) and systems engineering (SE) are essential skills in information technology (IT). There is an abundance of information available detailing the comprehensive bodies of knowledge, standards, and best practices. Despite the volume of information, there is surprisingly little information about how to tailor PM and SE tasks for…

  7. Examining pre-service science teachers' developing pedagogical design capacity for planning and supporting task-based classroom discussions

    NASA Astrophysics Data System (ADS)

    Ross, Danielle Kristina

    Teachers face many challenges as we move forward into the age of the Next Generation Science Standards (NGSS) (Achieve, Inc., 2013). The NGSS aim to develop a population of scientifically literate and talented students who can participate in the "innovation-driven economy" (p. 1). In order to meet these goals, teachers must provide students with opportunities to engage in science and engineering practices (SEPs) and learn core ideas of these disciplines. This study followed pre-service secondary science teachers as they participated in a secondary science teacher preparation program intended to support the development of their pedagogical design capacity (Brown, 2009) related to planning and supporting whole-class taskbased discussions. Teacher educators in this program designed an intervention that aimed in supporting this development. This study examined a particular dimension of PDC -- specifically, PSTs effective use of resources to plan science lessons in which students engage in a high demand task, participate in SEPs, and discuss their work in a whole-class setting. In order to examine the effectiveness of the intervention, I had to define PDC a priori. I measured PDC by documenting how/whether PSTs engaged in the following instructional planning practices: developing Learning Goals, selecting and/or designing challenging tasks, anticipating student thinking, planning for monitoring student thinking, imagining the discussion storyline, planning questions, and planning marking strategies. Analyses showed a significant difference between baseline lesson plan scores and Instructional Performance scores. These findings suggest these patterns and changes were directly linked to the teacher preparation program. The mean increase in Instructional Performance scores during the course of the teacher preparation year further supports the effect of the teacher preparation coursework. Pre-service teachers with high pedagogical design capacity continually integrated the ambitious planning practices they learned in their coursework. In contrast, pre-service teachers with low pedagogical design capacity appeared to appropriate the vocabulary and language they learned in coursework, but did not integrate these practices at a high level. This study suggests that pre-service teachers who receive intensive instruction on ambitious planning practices for task-based discussion effectively develop the pedagogical design capacity to plan for task-based discussion lessons.

  8. Proceedings of a Seminar on Initial Project Management Plans for Hydrologic Engineering and Economic Analysis Held at Otter Rock, Oregon on 22-24 September 1992

    DTIC Science & Technology

    1992-09-24

    for the fifteen remaining study sites. The total number of structures to be surveyed was estimated at 800 to 1,000. When the contract was complete...Corps of Engineers real estate appraisers or contract appraisers, should be listed as a separate task. The approximate number of structures to be...DOWNGRADING SCHEDULE Distribution of this document is unlimited. 4. PERFORMING ORGANIZATION REPORT NUMBER (S) S. MONITORING ORGANIZATION REPORT NUMBER (S

  9. Enabling a New Planning and Scheduling Paradigm

    NASA Technical Reports Server (NTRS)

    Jaap, John; Davis, Elizabeth

    2004-01-01

    The Flight Projects Directorate at NASA's Marshall Space Flight Center is developing a new planning and scheduling environment and a new scheduling algorithm to enable a paradigm shift in planning and scheduling concepts. Over the past 33 years Marshall has developed and evolved a paradigm for generating payload timelines for Skylab, Spacelab, various other Shuttle payloads, and the International Space Station. The current paradigm starts by collecting the requirements, called "tasks models," from the scientists and technologists for the tasks that they want to be done. Because of shortcomings in the current modeling schema, some requirements are entered as notes. Next a cadre with knowledge of vehicle and hardware modifies these models to encompass and be compatible with the hardware model; again, notes are added when the modeling schema does not provide a better way to represent the requirements. Finally, another cadre further modifies the models to be compatible with the scheduling engine. This last cadre also submits the models to the scheduling engine or builds the timeline manually to accommodate requirements that are expressed in notes. A future paradigm would provide a scheduling engine that accepts separate science models and hardware models. The modeling schema would have the capability to represent all the requirements without resorting to notes. Furthermore, the scheduling engine would not require that the models be modified to account for the capabilities (limitations) of the scheduling engine. The enabling technology under development at Marshall has three major components. (1) A new modeling schema allows expressing all the requirements of the tasks without resorting to notes or awkward contrivances. The chosen modeling schema is both maximally expressive and easy to use. It utilizes graphics methods to show hierarchies of task constraints and networks of temporal relationships. (2) A new scheduling algorithm automatically schedules the models without the intervention of a scheduling expert. The algorithm is tuned for the constraint hierarchies and the complex temporal relationships provided by the modeling schema. It has an extensive search algorithm which can exploit timing flexibilities and constraint and relationship options. (3) A web-based architecture allows multiple remote users to simultaneously model science and technology requirements and other users to model vehicle and hardware characteristics. The architecture allows the users to submit scheduling requests directly to the scheduling engine and immediately see the results. These three components are integrated so that science and technology experts with no knowledge of the vehicle or hardware subsystems and no knowledge of the internal workings of the scheduling engine have the ability to build and submit scheduling requests and see the results. The immediate feedback will hone the users' modeling skills and ultimately enable them to produce the desired timeline. This paper summarizes the three components of the enabling technology and describes how this technology would make a new paradigm possible.

  10. The approach to engineering tasks composition on knowledge portals

    NASA Astrophysics Data System (ADS)

    Novogrudska, Rina; Globa, Larysa; Schill, Alexsander; Romaniuk, Ryszard; Wójcik, Waldemar; Karnakova, Gaini; Kalizhanova, Aliya

    2017-08-01

    The paper presents an approach to engineering tasks composition on engineering knowledge portals. The specific features of engineering tasks are highlighted, their analysis makes the basis for partial engineering tasks integration. The formal algebraic system for engineering tasks composition is proposed, allowing to set the context-independent formal structures for engineering tasks elements' description. The method of engineering tasks composition is developed that allows to integrate partial calculation tasks into general calculation tasks on engineering portals, performed on user request demand. The real world scenario «Calculation of the strength for the power components of magnetic systems» is represented, approving the applicability and efficiency of proposed approach.

  11. Derivation of Performance Statements for the Automotive Mechanics Basic Trade Course: Research Documentation.

    ERIC Educational Resources Information Center

    Fox, A. P.; Kuhl, D. H.

    A project was conducted to derive a comprehensive list of the performances of a competence mechanic to satisfy the planning needs of automotive engineering lecturers, curriculum committees, researchers, course designers, and staff developers. A list of 127 tasks together with information about their relative importance and the frequency with which…

  12. Intelligent Engine Systems: Bearing System

    NASA Technical Reports Server (NTRS)

    Singh, Arnant P.

    2008-01-01

    The overall requirements necessary for sensing bearing distress and the related criteria to select a particular rotating sensor were established during the phase I. The current phase II efforts performed studies to evaluate the Robustness and Durability Enhancement of the rotating sensors, and to design, and develop the Built-in Telemetry System concepts for an aircraft engine differential sump. A generic test vehicle that can test the proposed bearing diagnostic system was designed, developed, and built. The Timken Company, who also assisted with testing the GE concept of using rotating sensors for the differential bearing diagnostics during previous phase, was selected as a subcontractor to assist General Electric (GE) for the design, and procurement of the test vehicle. A purchase order was prepared to define the different sub-tasks, and deliverables for this task. The University of Akron was selected to provide the necessary support for installing, and integrating the test vehicle with their newly designed test facility capable of simulating the operating environment for the planned testing. The planned testing with good and damaged bearings will be on hold pending further continuation of this effort during next phase.

  13. An airline study of advanced technology requirements for advanced high speed commercial engines. 3: Propulsion system requirements

    NASA Technical Reports Server (NTRS)

    Sallee, G. P.

    1973-01-01

    The advanced technology requirements for an advanced high speed commercial transport engine are presented. The results of the phase 3 effort cover the requirements and objectives for future aircraft propulsion systems. These requirements reflect the results of the Task 1 and 2 efforts and serve as a baseline for future evaluations, specification development efforts, contract/purchase agreements, and operational plans for future subsonic commercial engines. This report is divided into five major sections: (1) management objectives for commercial propulsion systems, (2) performance requirements for commercial transport propulsion systems, (3) design criteria for future transport engines, (4) design requirements for powerplant packages, and (5) testing.

  14. CasCADe: A Novel 4D Visualization System for Virtual Construction Planning.

    PubMed

    Ivson, Paulo; Nascimento, Daniel; Celes, Waldemar; Barbosa, Simone Dj

    2018-01-01

    Building Information Modeling (BIM) provides an integrated 3D environment to manage large-scale engineering projects. The Architecture, Engineering and Construction (AEC) industry explores 4D visualizations over these datasets for virtual construction planning. However, existing solutions lack adequate visual mechanisms to inspect the underlying schedule and make inconsistencies readily apparent. The goal of this paper is to apply best practices of information visualization to improve 4D analysis of construction plans. We first present a review of previous work that identifies common use cases and limitations. We then consulted with AEC professionals to specify the main design requirements for such applications. These guided the development of CasCADe, a novel 4D visualization system where task sequencing and spatio-temporal simultaneity are immediately apparent. This unique framework enables the combination of diverse analytical features to create an information-rich analysis environment. We also describe how engineering collaborators used CasCADe to review the real-world construction plans of an Oil & Gas process plant. The system made evident schedule uncertainties, identified work-space conflicts and helped analyze other constructability issues. The results and contributions of this paper suggest new avenues for future research in information visualization for the AEC industry.

  15. Integration Framework of Process Planning based on Resource Independent Operation Summary to Support Collaborative Manufacturing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kulvatunyou, Boonserm; Wysk, Richard A.; Cho, Hyunbo

    2004-06-01

    In today's global manufacturing environment, manufacturing functions are distributed as never before. Design, engineering, fabrication, and assembly of new products are done routinely in many different enterprises scattered around the world. Successful business transactions require the sharing of design and engineering data on an unprecedented scale. This paper describes a framework that facilitates the collaboration of engineering tasks, particularly process planning and analysis, to support such globalized manufacturing activities. The information models of data and the software components that integrate those information models are described. The integration framework uses an Integrated Product and Process Data (IPPD) representation called a Resourcemore » Independent Operation Summary (RIOS) to facilitate the communication of business and manufacturing requirements. Hierarchical process modeling, process planning decomposition and an augmented AND/OR directed graph are used in this representation. The Resource Specific Process Planning (RSPP) module assigns required equipment and tools, selects process parameters, and determines manufacturing costs based on two-level hierarchical RIOS data. The shop floor knowledge (resource and process knowledge) and a hybrid approach (heuristic and linear programming) to linearize the AND/OR graph provide the basis for the planning. Finally, a prototype system is developed and demonstrated with an exemplary part. Java and XML (Extensible Markup Language) are used to ensure software and information portability.« less

  16. Proceedings of the NASA Conference on Space Telerobotics, volume 4

    NASA Technical Reports Server (NTRS)

    Rodriguez, Guillermo (Editor); Seraji, Homayoun (Editor)

    1989-01-01

    Papers presented at the NASA Conference on Space Telerobotics are compiled. The theme of the conference was man-machine collaboration in space. The conference provided a forum for researchers and engineers to exchange ideas on the research and development required for the application of telerobotic technology to the space systems planned for the 1990's and beyond. Volume 4 contains papers related to the following subject areas: manipulator control; telemanipulation; flight experiments (systems and simulators); sensor-based planning; robot kinematics, dynamics, and control; robot task planning and assembly; and research activities at the NASA Langley Research Center.

  17. Satellite Power Systems (SPS) concept definition study (Exhibit D). Volume 5: Systems engineering/integration research and technology

    NASA Technical Reports Server (NTRS)

    Hanley, G. M.

    1981-01-01

    Guidelines and ground rules followed in the development of requirements for the SPS are presented. Development planning objectives are specified in each of these areas, and evolutionary SPS program scenarios are described for the various concepts studied during the past one year contract. Program descriptions are presented as planning packages of technical tasks, and schedule phasing. Each package identifies the ground based technology effort that will facilitate SPS definitions, designs, development, and operations.

  18. Virtual manufacturing work cell for engineering

    NASA Astrophysics Data System (ADS)

    Watanabe, Hideo; Ohashi, Kazushi; Takahashi, Nobuyuki; Kato, Kiyotaka; Fujita, Satoru

    1997-12-01

    The life cycles of products have been getting shorter. To meet this rapid turnover, manufacturing systems must be frequently changed as well. In engineering to develop manufacturing systems, there are several tasks such as process planning, layout design, programming, and final testing using actual machines. This development of manufacturing systems takes a long time and is expensive. To aid the above engineering process, we have developed the virtual manufacturing workcell (VMW). This paper describes a concept of VMW and design method through computer aided manufacturing engineering using VMW (CAME-VMW) related to the above engineering tasks. The VMW has all design data, and realizes a behavior of equipment and devices using a simulator. The simulator has logical and physical functionality. The one simulates a sequence control and the other simulates motion control, shape movement in 3D space. The simulator can execute the same control software made for actual machines. Therefore we can verify the behavior precisely before the manufacturing workcell will be constructed. The VMW creates engineering work space for several engineers and offers debugging tools such as virtual equipment and virtual controllers. We applied this VMW to development of a transfer workcell for vaporization machine in actual manufacturing system to produce plasma display panel (PDP) workcell and confirmed its effectiveness.

  19. 2014 Space Human Factors Engineering Standing Review Panel

    NASA Technical Reports Server (NTRS)

    Steinberg, Susan

    2014-01-01

    The 2014 Space Human Factors Engineering (SHFE) Standing Review Panel (from here on referred to as the SRP) participated in a WebEx/teleconference with members of the Space Human Factors and Habitability (SHFH) Element, representatives from the Human Research Program (HRP), the National Space Biomedical Research Institute (NSBRI), and NASA Headquarters on November 17, 2014 (list of participants is in Section XI of this report). The SRP reviewed the updated research plans for the Risk of Incompatible Vehicle/Habitat Design (HAB Risk) and the Risk of Performance Errors Due to Training Deficiencies (Train Risk). The SRP also received a status update on the Risk of Inadequate Critical Task Design (Task Risk), the Risk of Inadequate Design of Human and Automation/Robotic Integration (HARI Risk), and the Risk of Inadequate Human-Computer Interaction (HCI Risk).

  20. Putting ROSE to Work: A Proposed Application of a Request-Oriented Scheduling Engine for Space Station Operations

    NASA Technical Reports Server (NTRS)

    Jaap, John; Muery, Kim

    2000-01-01

    Scheduling engines are found at the core of software systems that plan and schedule activities and resources. A Request-Oriented Scheduling Engine (ROSE) is one that processes a single request (adding a task to a timeline) and then waits for another request. For the International Space Station, a robust ROSE-based system would support multiple, simultaneous users, each formulating requests (defining scheduling requirements), submitting these requests via the internet to a single scheduling engine operating on a single timeline, and immediately viewing the resulting timeline. ROSE is significantly different from the engine currently used to schedule Space Station operations. The current engine supports essentially one person at a time, with a pre-defined set of requirements from many payloads, working in either a "batch" scheduling mode or an interactive/manual scheduling mode. A planning and scheduling process that takes advantage of the features of ROSE could produce greater customer satisfaction at reduced cost and reduced flow time. This paper describes a possible ROSE-based scheduling process and identifies the additional software component required to support it. Resulting changes to the management and control of the process are also discussed.

  1. Fiber-reinforced ceramic composites for Earth-to-orbit rocket engine turbines

    NASA Technical Reports Server (NTRS)

    Brockmeyer, Jerry W.; Schnittgrund, Gary D.

    1990-01-01

    Fiber reinforced ceramic matrix composites (FRCMC) are emerging materials systems that offer potential for use in liquid rocket engines. Advantages of these materials in rocket engine turbomachinery include performance gain due to higher turbine inlet temperature, reduced launch costs, reduced maintenance with associated cost benefits, and reduced weight. This program was initiated to assess the state of FRCMC development and to propose a plan for their implementation into liquid rocket engine turbomachinery. A complete range of FRCMC materials was investigated relative to their development status and feasibility for use in the hot gas path of earth-to-orbit rocket engine turbomachinery. Of the candidate systems, carbon fiber-reinforced silicon carbide (C/SiC) offers the greatest near-term potential. Critical hot gas path components were identified, and the first stage inlet nozzle and turbine rotor of the fuel turbopump for the liquid oxygen/hydrogen Space Transportation Main Engine (STME) were selected for conceptual design and analysis. The critical issues associated with the use of FRCMC were identified. Turbine blades were designed, analyzed and fabricated. The Technology Development Plan, completed as Task 5 of this program, provides a course of action for resolution of these issues.

  2. FY 1986 current fiscal year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office/RI during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, taskmore » monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. System models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less

  3. Coordinating Federal Science, Technology, Engineering, and Mathematics (STEM) Education Investments: Progress Report. A Report from the Federal Coordination in STEM Education Task Force Committee on STEM Education National Science and Technology Council: In Response to the Requirements of the America COMPETES Reauthorization Act of 2010

    ERIC Educational Resources Information Center

    Executive Office of the President, 2012

    2012-01-01

    The America COMPETES Reauthorization Act of 2013 directs the Office of Science and Technology Policy (OSTP) to create an interagency committee under the National Science and Technology Council (NSTC) to develop a 5-year Federal science, technology, engineering, and mathematics (STEM) education strategic plan that includes: (1) annual and long-term…

  4. Human Factors Evaluations of Two-Dimensional Spacecraft Conceptual Layouts

    NASA Technical Reports Server (NTRS)

    Kennedy, Kriss J.; Toups, Larry D.; Rudisill, Marianne

    2010-01-01

    Much of the human factors work done in support of the NASA Constellation lunar program has been with low fidelity mockups. These volumetric replicas of the future lunar spacecraft allow researchers to insert test subjects from the engineering and astronaut population and evaluate the vehicle design as the test subjects perform simulations of various operational tasks. However, lunar outpost designs must be evaluated without the use of mockups, creating a need for evaluation tools that can be performed on two-dimension conceptual spacecraft layouts, such as floor plans. A tool based on the Cooper- Harper scale was developed and applied to one lunar scenario, enabling engineers to select between two competing floor plan layouts. Keywords: Constellation, human factors, tools, processes, habitat, outpost, Net Habitable Volume, Cooper-Harper.

  5. Experiments in autonomous robotics

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hamel, W.R.

    1987-01-01

    The Center for Engineering Systems Advanced Research (CESAR) is performing basic research in autonomous robotics for energy-related applications in hazardous environments. The CESAR research agenda includes a strong experimental component to assure practical evaluation of new concepts and theories. An evolutionary sequence of mobile research robots has been planned to support research in robot navigation, world sensing, and object manipulation. A number of experiments have been performed in studying robot navigation and path planning with planar sonar sensing. Future experiments will address more complex tasks involving three-dimensional sensing, dexterous manipulation, and human-scale operations.

  6. Support to LANL: Cost estimation. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This report summarizes the activities and progress by ICF Kaiser Engineers conducted on behalf of Los Alamos National Laboratories (LANL) for the US Department of Energy, Office of Waste Management (EM-33) in the area of improving methods for Cost Estimation. This work was conducted between October 1, 1992 and September 30, 1993. ICF Kaiser Engineers supported LANL in providing the Office of Waste Management with planning and document preparation services for a Cost and Schedule Estimating Guide (Guide). The intent of the Guide was to use Activity-Based Cost (ABC) estimation as a basic method in preparing cost estimates for DOEmore » planning and budgeting documents, including Activity Data Sheets (ADSs), which form the basis for the Five Year Plan document. Prior to the initiation of the present contract with LANL, ICF Kaiser Engineers was tasked to initiate planning efforts directed toward a Guide. This work, accomplished from June to September, 1992, included visits to eight DOE field offices and consultation with DOE Headquarters staff to determine the need for a Guide, the desired contents of a Guide, and the types of ABC estimation methods and documentation requirements that would be compatible with current or potential practices and expertise in existence at DOE field offices and their contractors.« less

  7. Design of an Orbital Inspection Satellite

    DTIC Science & Technology

    1986-12-01

    ADDRESS (City, State, and ZIP Code ) 10. SOURCE OF FUNDING NUMBERS PROGRAM PROJECT TASK WORK UNITELEMENT NO. NO. NO. CCESSION NO. 11. TITLE (include...Captain, USAF Dh t ibutioni Availabiity Codes Avail adlor Dist [Special December 1986 Approved for public release; distribution...lends itself to the technique of multi -objective analysis. The final step is planning for action. This communicates the entire systems engineering

  8. Methodology for identifying and representing knowledge in the scope of CMM inspection resource selection

    NASA Astrophysics Data System (ADS)

    Martínez, S.; Barreiro, J.; Cuesta, E.; Álvarez, B. J.; González, D.

    2012-04-01

    This paper is focused on the task of elicitation and structuring of knowledge related to selection of inspection resources. The final goal is to obtain an informal model of knowledge oriented to the inspection planning in coordinate measuring machines. In the first tasks, where knowledge is captured, it is necessary to use tools that make easier the analysis and structuring of knowledge, so that rules of selection can be easily stated to configure the inspection resources. In order to store the knowledge a so-called Onto-Process ontology has been developed. This ontology may be of application to diverse processes in manufacturing engineering. This paper describes the decomposition of the ontology in terms of general units of knowledge and others more specific for selection of sensor assemblies in inspection planning with touch sensors.

  9. Improved silicon nitride for advanced heat engines

    NASA Technical Reports Server (NTRS)

    Yeh, Hun C.; Fang, Ho T.

    1987-01-01

    The technology base required to fabricate silicon nitride components with the strength, reliability, and reproducibility necessary for actual heat engine applications is presented. Task 2 was set up to develop test bars with high Weibull slope and greater high temperature strength, and to conduct an initial net shape component fabrication evaluation. Screening experiments were performed in Task 7 on advanced materials and processing for input to Task 2. The technical efforts performed in the second year of a 5-yr program are covered. The first iteration of Task 2 was completed as planned. Two half-replicated, fractional factorial (2 sup 5), statistically designed matrix experiments were conducted. These experiments have identified Denka 9FW Si3N4 as an alternate raw material to GTE SN502 Si3N4 for subsequent process evaluation. A detailed statistical analysis was conducted to correlate processing conditions with as-processed test bar properties. One processing condition produced a material with a 97 ksi average room temperature MOR (100 percent of goal) with 13.2 Weibull slope (83 percent of goal); another condition produced 86 ksi (6 percent over baseline) room temperature strength with a Weibull slope of 20 (125 percent of goal).

  10. Space station data system analysis/architecture study. Task 3: Trade studies, DR-5, volume 2

    NASA Technical Reports Server (NTRS)

    1985-01-01

    Results of a Space Station Data System Analysis/Architecture Study for the Goddard Space Flight Center are presented. This study, which emphasized a system engineering design for a complete, end-to-end data system, was divided into six tasks: (1); Functional requirements definition; (2) Options development; (3) Trade studies; (4) System definitions; (5) Program plan; and (6) Study maintenance. The Task inter-relationship and documentation flow are described. Information in volume 2 is devoted to Task 3: trade Studies. Trade Studies have been carried out in the following areas: (1) software development test and integration capability; (2) fault tolerant computing; (3) space qualified computers; (4) distributed data base management system; (5) system integration test and verification; (6) crew workstations; (7) mass storage; (8) command and resource management; and (9) space communications. Results are presented for each task.

  11. Using model based systems engineering for the development of the Large Synoptic Survey Telescope's operational plan

    NASA Astrophysics Data System (ADS)

    Selvy, Brian M.; Claver, Charles; Willman, Beth; Petravick, Don; Johnson, Margaret; Reil, Kevin; Marshall, Stuart; Thomas, Sandrine; Lotz, Paul; Schumacher, German; Lim, Kian-Tat; Jenness, Tim; Jacoby, Suzanne; Emmons, Ben; Axelrod, Tim

    2016-08-01

    We† provide an overview of the Model Based Systems Engineering (MBSE) language, tool, and methodology being used in our development of the Operational Plan for Large Synoptic Survey Telescope (LSST) operations. LSST's Systems Engineering (SE) team is using a model-based approach to operational plan development to: 1) capture the topdown stakeholders' needs and functional allocations defining the scope, required tasks, and personnel needed for operations, and 2) capture the bottom-up operations and maintenance activities required to conduct the LSST survey across its distributed operations sites for the full ten year survey duration. To accomplish these complimentary goals and ensure that they result in self-consistent results, we have developed a holistic approach using the Sparx Enterprise Architect modeling tool and Systems Modeling Language (SysML). This approach utilizes SysML Use Cases, Actors, associated relationships, and Activity Diagrams to document and refine all of the major operations and maintenance activities that will be required to successfully operate the observatory and meet stakeholder expectations. We have developed several customized extensions of the SysML language including the creation of a custom stereotyped Use Case element with unique tagged values, as well as unique association connectors and Actor stereotypes. We demonstrate this customized MBSE methodology enables us to define: 1) the rolls each human Actor must take on to successfully carry out the activities associated with the Use Cases; 2) the skills each Actor must possess; 3) the functional allocation of all required stakeholder activities and Use Cases to organizational entities tasked with carrying them out; and 4) the organization structure required to successfully execute the operational survey. Our approach allows for continual refinement utilizing the systems engineering spiral method to expose finer levels of detail as necessary. For example, the bottom-up, Use Case-driven approach will be deployed in the future to develop the detailed work procedures required to successfully execute each operational activity.

  12. Engineering Geodesy - Definition and Core Competencies

    NASA Astrophysics Data System (ADS)

    Kuhlmann, Heiner; Schwieger, Volker; Wieser, Andreas; Niemeier, Wolfgang

    2014-11-01

    This article summarises discussions concerning the definition of "engineering geodesy" within the German Geodetic Commission. It is noted that engineering geodesy by means of its tasks, methods and characteristics is an application-oriented science whose research questions often arise from observed phenomena or from unsolved practical problems. In particular it is characterised by the professional handling of geometry-related problems in a cost-effective manner that includes comprehensive quality assessment at all phases of the problem solution - from planning through measurement to data processing and interpretation. The current methodical developments are primarily characterised by the increasing integration of the measurement and analysis into challenging construction, production and monitoring processes as well as by the transition to spatially continuous methods. A modern definition of engineering geodesy is proposed at the end of this article.

  13. TRU Waste Management Program. Cost/schedule optimization analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.

    This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office Rockwell International (JIO/RI) during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, taskmore » guidance development, task monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short-term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. Systems models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less

  14. EARTHSAWtm IN-SITU CONTAINMENT OF PITS AND TRENCHES

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ernest E. Carter, P.E.

    2002-09-20

    EarthSaw{trademark} is a proposed technology for construction of uniform high quality barriers under and around pits and trenches containing buried radioactive waste without excavating or disturbing the waste. The method works by digging a deep vertical trench around the perimeter of a site, filling that trench with high specific gravity grout sealant, and then cutting a horizontal bottom pathway at the base of the trench with a simple cable saw mechanism. The severed block of earth becomes buoyant in the grout and floats on a thick layer of grout, which then cures into an impermeable barrier. The ''Interim Report onmore » task 1 and 2'' which is incorporated into this report as appendix A, provided theoretical derivations, field validation of formulas, a detailed quantitative engineering description of the technique, engineering drawings of the hardware, and a computer model of how the process would perform in a wide variety of soil conditions common to DOE waste burial sites. The accomplishments of task 1 and 2 are also summarized herein Task 3 work product provides a comprehensive field test plan in Appendix B and a health and safety plan in Appendix C and proposal for a field-scale demonstration of the EarthSaw barrier technology. The final report on the subcontracted stress analysis is provided in Appendix D. A copy of the unified computer model is provided as individual non-functional images of each sheet of the spreadsheet and separately as a Microsoft Excel 2000 file.« less

  15. Servicer system demonstration plan and capability development

    NASA Technical Reports Server (NTRS)

    1987-01-01

    An orbital maneuvering vehicle (OMV) front end kit is defined which is capable of performing in-situ fluid resupply and modular maintenance of free flying spacecraft based on the integrated orbital servicing system (IOSS) concept. The compatibility of the IOSS to perform gas and fluid umbilical connect and disconnect functions utilizing connect systems currently available or in development is addressed. A series of tasks involving on-orbit servicing and the engineering test unit (ETU) of the on-orbit service were studied. The objective is the advancement of orbital servicing by expanding the Spacecraft Servicing Demonstration Plan (SSDP) to include detail demonstration planning using the Multimission Modular Spacecraft (MMS) and upgrading the ETU control.

  16. Engineered Barrier System: Physical and Chemical Environment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    P. Dixon

    2004-04-26

    The conceptual and predictive models documented in this Engineered Barrier System: Physical and Chemical Environment Model report describe the evolution of the physical and chemical conditions within the waste emplacement drifts of the repository. The modeling approaches and model output data will be used in the total system performance assessment (TSPA-LA) to assess the performance of the engineered barrier system and the waste form. These models evaluate the range of potential water compositions within the emplacement drifts, resulting from the interaction of introduced materials and minerals in dust with water seeping into the drifts and with aqueous solutions forming bymore » deliquescence of dust (as influenced by atmospheric conditions), and from thermal-hydrological-chemical (THC) processes in the drift. These models also consider the uncertainty and variability in water chemistry inside the drift and the compositions of introduced materials within the drift. This report develops and documents a set of process- and abstraction-level models that constitute the engineered barrier system: physical and chemical environment model. Where possible, these models use information directly from other process model reports as input, which promotes integration among process models used for total system performance assessment. Specific tasks and activities of modeling the physical and chemical environment are included in the technical work plan ''Technical Work Plan for: In-Drift Geochemistry Modeling'' (BSC 2004 [DIRS 166519]). As described in the technical work plan, the development of this report is coordinated with the development of other engineered barrier system analysis model reports.« less

  17. A Study on the Use of a Metadata Schema for Characterizing School Education STEM Lessons Plans by STEM Teachers

    ERIC Educational Resources Information Center

    Zervas, Panagiotis; Tsourlidaki, Eleftheria; Cao, Yiwei; Sotiriou, Sofoklis; Sampson, Demetrios G.; Faltin, Nils

    2016-01-01

    Online labs (OLs) constitute digital educational tools which can have a significant role in supporting science, technology, engineering and mathematics (STEM) teachers in their daily teaching practice. Designing STEM lessons supported by specific OLs is a challenging task and thus, it is useful for STEM teachers to be able to share their lesson…

  18. An Exploratory Study of Self-Regulated Learning Strategies in a Design Project by Students in Grades 9-12

    ERIC Educational Resources Information Center

    Lawanto, Oenardi; Butler, Deborah; Cartier, Sylvie; Santoso, Harry; Lawanto, Kevin; Clark, David

    2013-01-01

    This exploratory study evaluated self-regulated learning (SRL) strategies of 27 students in grades 9-12 during an engineering design project. The specific focus of the study was on student task interpretation and its relation to planning and cognitive strategies in design activities. Two research questions guided the study: (1) To what degree was…

  19. CFD Analysis of a Penta-hulled, Air-Entrapment, High-Speed Planning Vessel

    DTIC Science & Technology

    2008-03-01

    INTRODUCTION A. BACKGROUND The 2007 Total Ship Systems Engineering (TSSE) class was tasked with designing a new riverine craft or specialized...the concept of operations, for our defined system architecture (combined Specialized Command and Control Craft / Mobile Operating Base). This also...of an integration process that requires both systems and equipment optimization while meeting predetermined requirements set for by the Concept of

  20. Active Reliability Engineering - Technical Concept and Program Plan. A Solid-State Systems Approach to Increased Reliability and Availability in Military Systems.

    DTIC Science & Technology

    1983-10-05

    battle damage. Others are local electrical power and cooling disruptions. Again, a highly critical function is lost if its computer site is destroyed. A...formalized design of the test bed to meet the requirements of the functional description and goals of the program. AMTEC --Z3IT TASKS: 610, 710, 810

  1. Long life Regenerative Fuel Cell technology development plan

    NASA Technical Reports Server (NTRS)

    Littman, Franklin D.; Cataldo, Robert L.; Mcelroy, James F.; Stedman, Jay K.

    1992-01-01

    This paper summarizes a technology roadmap for completing advanced development of a Proton Exchange Membrane (PEM) Regenerative Fuel Cell (RFC) to meet long life (20,000 hrs at 50 percent duty cycle) mobile or portable power system applications on the surface of the moon and Mars. Development of two different sized RFC power system modules is included in this plan (3 and 7.5 kWe). A conservative approach was taken which includes the development of a Ground Engineering System, Qualification Unit, and Flight Unit. This paper includes a concept description, technology assessment, development issues, development tasks, and development schedule.

  2. Human capabilities in space. [man machine interaction

    NASA Technical Reports Server (NTRS)

    Nicogossian, A. E.

    1984-01-01

    Man's ability to live and perform useful work in space was demonstrated throughout the history of manned space flight. Current planning envisions a multi-functional space station. Man's unique abilities to respond to the unforeseen and to operate at a level of complexity exceeding any reasonable amount of previous planning distinguish him from present day machines. His limitations, however, include his inherent inability to survive without protection, his limited strength, and his propensity to make mistakes when performing repetitive and monotonous tasks. By contrast, an automated system does routine and delicate tasks, exerts force smoothly and precisely, stores, and recalls large amounts of data, and performs deductive reasoning while maintaining a relative insensitivity to the environment. The establishment of a permanent presence of man in space demands that man and machines be appropriately combined in spaceborne systems. To achieve this optimal combination, research is needed in such diverse fields as artificial intelligence, robotics, behavioral psychology, economics, and human factors engineering.

  3. An Enabling Technology for New Planning and Scheduling Paradigms

    NASA Technical Reports Server (NTRS)

    Jaap, John; Davis, Elizabeth

    2004-01-01

    The Night Projects Directorate at NASA's Marshall Space Flight Center is developing a new planning and scheduling environment and a new scheduling algorithm to enable a paradigm shift in planning and scheduling concepts. Over the past 33 years Marshall has developed and evolved a paradigm for generating payload timelines for Skylab, Spacelab, various other Shuttle payloads, and the International Space Station. The current paradigm starts by collecting the requirements, called ?ask models," from the scientists and technologists for the tasks that are to be scheduled. Because of shortcomings in the current modeling schema, some requirements are entered as notes. Next, a cadre with knowledge of vehicle and hardware modifies these models to encompass and be compatible with the hardware model; again, notes are added when the modeling schema does not provide a better way to represent the requirements. Finally, the models are modified to be compatible with the scheduling engine. Then the models are submitted to the scheduling engine for automatic scheduling or, when requirements are expressed in notes, the timeline is built manually. A future paradigm would provide a scheduling engine that accepts separate science models and hardware models. The modeling schema would have the capability to represent all the requirements without resorting to notes. Furthermore, the scheduling engine would not require that the models be modified to account for the capabilities (limitations) of the scheduling engine. The enabling technology under development at Marshall has three major components: (1) A new modeling schema allows expressing all the requirements of the tasks without resorting to notes or awkward contrivances. The chosen modeling schema is both maximally expressive and easy to use. It utilizes graphical methods to show hierarchies of task constraints and networks of temporal relationships. (2) A new scheduling algorithm automatically schedules the models without the intervention of a scheduling expert. The algorithm is tuned for the constraint hierarchies and the complex temporal relationships provided by the modeling schema. It has an extensive search algorithm that can exploit timing flexibilities and constraint and relationship options. (3) An innovative architecture allows multiple remote users to simultaneously model science and technology requirements and other users to model vehicle and hardware characteristics. The architecture allows the remote users to submit scheduling requests directly to the scheduling engine and immediately see the results. These three components are integrated so that science and technology experts with no knowledge of the vehicle or hardware subsystems and no knowledge of the internal workings of the scheduling engine have the ability to build and submit scheduling requests and see the results. The immediate feedback will hone the users' modeling skills and ultimately enable them to produce the desired timeline. This paper summarizes the three components of the enabling technology and describes how this technology would make a new paradigm possible.

  4. Pretreatment Engineering Platform Phase 1 Final Test Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kurath, Dean E.; Hanson, Brady D.; Minette, Michael J.

    2009-12-23

    Pacific Northwest National Laboratory (PNNL) was tasked by Bechtel National Inc. (BNI) on the River Protection Project, Hanford Tank Waste Treatment and Immobilization Plant (RPP-WTP) project to conduct testing to demonstrate the performance of the WTP Pretreatment Facility (PTF) leaching and ultrafiltration processes at an engineering-scale. In addition to the demonstration, the testing was to address specific technical issues identified in Issue Response Plan for Implementation of External Flowsheet Review Team (EFRT) Recommendations - M12, Undemonstrated Leaching Processes.( ) Testing was conducted in a 1/4.5-scale mock-up of the PTF ultrafiltration system, the Pretreatment Engineering Platform (PEP). Parallel laboratory testing wasmore » conducted in various PNNL laboratories to allow direct comparison of process performance at an engineering-scale and a laboratory-scale. This report presents and discusses the results of those tests.« less

  5. Methodology for automating software systems. Task 1 of the foundations for automating software systems

    NASA Technical Reports Server (NTRS)

    Moseley, Warren

    1989-01-01

    The early stages of a research program designed to establish an experimental research platform for software engineering are described. Major emphasis is placed on Computer Assisted Software Engineering (CASE). The Poor Man's CASE Tool is based on the Apple Macintosh system, employing available software including Focal Point II, Hypercard, XRefText, and Macproject. These programs are functional in themselves, but through advanced linking are available for operation from within the tool being developed. The research platform is intended to merge software engineering technology with artificial intelligence (AI). In the first prototype of the PMCT, however, the sections of AI are not included. CASE tools assist the software engineer in planning goals, routes to those goals, and ways to measure progress. The method described allows software to be synthesized instead of being written or built.

  6. Scripts and information units in future planning: Interactions between a past and a future planning task.

    PubMed

    Cordonnier, Aline; Barnier, Amanda J; Sutton, John

    2016-01-01

    Research on future thinking has emphasized how episodic details from memories are combined to create future thoughts, but has not yet examined the role of semantic scripts. In this study, participants recalled how they planned a past camping trip in Australia (past planning task) and imagined how they would plan a future camping trip (future planning task), set either in a familiar (Australia) or an unfamiliar (Antarctica) context. Transcripts were segmented into information units that were coded according to semantic category (e.g., where, when, transport, material, actions). Results revealed a strong interaction between tasks and their presentation order. Starting with the past planning task constrained the future planning task when the context was familiar. Participants generated no new information when the future camping trip was set in Australia and completed second (after the past planning task). Conversely, starting with the future planning task facilitated the past planning task. Participants recalled more information units of their past plan when the past planning task was completed second (after the future planning task). These results shed new light on the role of scripts in past and future thinking and on how past and future thinking processes interact.

  7. Controlling uncertainty: a review of human behavior in complex dynamic environments.

    PubMed

    Osman, Magda

    2010-01-01

    Complex dynamic control (CDC) tasks are a type of problem-solving environment used for examining many cognitive activities (e.g., attention, control, decision making, hypothesis testing, implicit learning, memory, monitoring, planning, and problem solving). Because of their popularity, there have been many findings from diverse domains of research (economics, engineering, ergonomics, human-computer interaction, management, psychology), but they remain largely disconnected from each other. The objective of this article is to review theoretical developments and empirical work on CDC tasks, and to introduce a novel framework (monitoring and control framework) as a tool for integrating theory and findings. The main thesis of the monitoring and control framework is that CDC tasks are characteristically uncertain environments, and subjective judgments of uncertainty guide the way in which monitoring and control behaviors attempt to reduce it. The article concludes by discussing new insights into continuing debates and future directions for research on CDC tasks.

  8. ISS Operations Cost Reductions Through Automation of Real-Time Planning Tasks

    NASA Technical Reports Server (NTRS)

    Hall, Timothy A.; Clancey, William J.; McDonald, Aaron; Toschlog, Jason; Tucker, Tyson; Khan, Ahmed; Madrid, Steven (Eric)

    2011-01-01

    In 2007 the Johnson Space Center s Mission Operations Directorate (MOD) management team challenged their organizations to find ways to reduce the cost of operations for supporting the International Space Station (ISS) in the Mission Control Center (MCC). Each MOD organization was asked to define and execute projects that would help them attain cost reductions by 2012. The MOD Operations Division Flight Planning Branch responded to this challenge by launching several software automation projects that would allow them to greatly improve console operations and reduce ISS console staffing and intern reduce operating costs. These tasks ranged from improving the management and integration mission plan changes, to automating the uploading and downloading of information to and from the ISS and the associated ground complex tasks that required multiple decision points. The software solutions leveraged several different technologies including customized web applications and implementation of industry standard web services architecture; as well as engaging a previously TRL 4-5 technology developed by Ames Research Center (ARC) that utilized an intelligent agent-based system to manage and automate file traffic flow, archive data, and generate console logs. These projects to date have allowed the MOD Operations organization to remove one full time (7 x 24 x 365) ISS console position in 2010; with the goal of eliminating a second full time ISS console support position by 2012. The team will also reduce one long range planning console position by 2014. When complete, these Flight Planning Branch projects will account for the elimination of 3 console positions and a reduction in staffing of 11 engineering personnel (EP) for ISS.

  9. Federal Plan for High-End Computing. Report of the High-End Computing Revitalization Task Force (HECRTF)

    DTIC Science & Technology

    2004-07-01

    steadily for the past fifteen years, while memory latency and bandwidth have improved much more slowly. For example, Intel processor clock rates38 have... processor and memory performance) all greatly restrict the ability to achieve high levels of performance for science, engineering, and national...sub-nuclear distances. Guide experiments to identify transition from quantum chromodynamics to quark -gluon plasma. Accelerator Physics Accurate

  10. DRACO Flowpath Performance and Environments

    NASA Technical Reports Server (NTRS)

    Komar, D. R.; McDonald, Jon

    1999-01-01

    The Advanced Space Transportation (AST) project office has challenged NASA to design, manufacture, ground-test and flight-test an axisymmetric, hydrocarbon-fueled, flight-weight, ejector-ramjet engine system testbed no later than 2005. To accomplish this, a multi-center NASA team has been assembled. The goal of this team, led by NASA-Marshall Space Flight Center (MSFC), is to develop propulsion technologies that demonstrate rocket and airbreathing combined-cycle operation (DRACO). Current technical activities include flowpath conceptual design, engine systems conceptual design, and feasibility studies investigating the integration and operation of the DRACO engine with a Lockheed D-21B drone. This paper focuses on the activities of the Flowpath Systems Product Development Team (PDT), led by NASA-Glenn Research Center (GRC) and supported by NASA-MSFC and TechLand Research, Inc. The objective of the Flowpath PDT at the start of the DRACO program was to establish a conceptual design of the flowpath aerodynamic lines, determine the preliminary performance, define the internal environments, and support the DRACO testbed concept feasibility studies. To accomplish these tasks, the PDT convened to establish a baseline flowpath concept. With the conceptual lines defined, cycle analysis tasks were planned and the flowpath performance and internal environments were defined. Additionally, sensitivity studies investigating the effects of inlet reference area, combustion performance, and combustor/nozzle materials selection were performed to support the Flowpath PDT design process. Results of these tasks are the emphasis of this paper and are intended to verify the feasibility of the DRACO flowpath and engine system as well as identify the primary technical challenges inherent in the flight-weight design of an advanced propulsion technology demonstration engine. Preliminary cycle performance decks were developed to support the testbed concept feasibility studies but are not discussed further in this paper.

  11. Design, fabrication, test, qualification and price analysis for third generation design solar cell modules

    NASA Technical Reports Server (NTRS)

    1980-01-01

    An updated program plan is presented showing the task descriptions depicting the work, progress, achievements, and the cause of any deviations from the original plan (SC-1), and how this impacted on the original schedule of the program. In addition there is an update documenting all design alterations made during the pre-production phase and a complete up to date set of engineering and manufacturing documentation (CM-1). The purpose of the work in the original plan was to explore, design, develop, test, and deliver 1000 watts of prototype flat plate, photovoltaic modules appropriate for use in applications in the 20 to 500 kilowatt range and which show potential for meeting the 1986 cost goals.

  12. Space shuttle maneuvering engine reusable thrust chamber program. Task 11: Low Epsilon stability test plan

    NASA Technical Reports Server (NTRS)

    Pauckert, R. P.

    1974-01-01

    The performance and heat transfer characteristics of a doublet element type injector for the space shuttle orbiter maneuvering engine thrust chamber were investigated. Ths stability characteristics were evaluated over a range of chamber pressures and mixture ratios. The specific objectives of the test were: (1) to determine whether stability has been influenced by injection of boundary layer coolant across the cavity entrance, (2) if the injector is stable, to determine the minimum cavity area required to maintain stability, and (3) if the injector is unstable, to determine the effects of entrance geometry and increased area on stability.

  13. Rotational-path decomposition based recursive planning for spacecraft attitude reorientation

    NASA Astrophysics Data System (ADS)

    Xu, Rui; Wang, Hui; Xu, Wenming; Cui, Pingyuan; Zhu, Shengying

    2018-02-01

    The spacecraft reorientation is a common task in many space missions. With multiple pointing constraints, it is greatly difficult to solve the constrained spacecraft reorientation planning problem. To deal with this problem, an efficient rotational-path decomposition based recursive planning (RDRP) method is proposed in this paper. The uniform pointing-constraint-ignored attitude rotation planning process is designed to solve all rotations without considering pointing constraints. Then the whole path is checked node by node. If any pointing constraint is violated, the nearest critical increment approach will be used to generate feasible alternative nodes in the process of rotational-path decomposition. As the planning path of each subdivision may still violate pointing constraints, multiple decomposition is needed and the reorientation planning is designed as a recursive manner. Simulation results demonstrate the effectiveness of the proposed method. The proposed method has been successfully applied in two SPARK microsatellites to solve onboard constrained attitude reorientation planning problem, which were developed by the Shanghai Engineering Center for Microsatellites and launched on 22 December 2016.

  14. The design and application of a Transportable Inference Engine (TIE1)

    NASA Technical Reports Server (NTRS)

    Mclean, David R.

    1986-01-01

    A Transportable Inference Engine (TIE1) system has been developed by the author as part of the Interactive Experimenter Planning System (IEPS) task which is involved with developing expert systems in support of the Spacecraft Control Programs Branch at Goddard Space Flight Center in Greenbelt, Maryland. Unlike traditional inference engines, TIE1 is written in the C programming language. In the TIE1 system, knowledge is represented by a hierarchical network of objects which have rule frames. The TIE1 search algorithm uses a set of strategies, including backward chaining, to obtain the values of goals. The application of TIE1 to a spacecraft scheduling problem is described. This application involves the development of a strategies interpreter which uses TIE1 to do constraint checking.

  15. The 2015-2016 SEPMAP Program at NASA JSC: Science, Engineering, and Program Management Training

    NASA Technical Reports Server (NTRS)

    Graham, L.; Archer, D.; Bakalyar, J.; Berger, E.; Blome, E.; Brown, R.; Cox, S.; Curiel, P.; Eid, R.; Eppler, D.; hide

    2017-01-01

    The Systems Engineering Project Management Advancement Program (SEPMAP) at NASA Johnson Space Center (JSC) is an employee development program designed to provide graduate level training in project management and systems engineering. The program includes an applied learning project with engineering and integrated science goals requirements. The teams were presented with a task: Collect a representative sample set from a field site using a hexacopter platform, as if performing a scientific reconnaissance to assess whether the site is of sufficient scientific interest to justify exploration by astronauts. Four teams worked through the eighteen-month course to design customized sampling payloads integrated with the hexacopter, and then operate the aircraft to meet sampling requirements of number (= 5) and mass (= 5g each). The "Mars Yard" at JSC was utilized for this purpose. This project activity closely parallels NASA plans for the future exploration of Mars, where remote sites will be reconnoitered ahead of crewed exploration.

  16. Automated and comprehensive link engineering supporting branched, ring, and mesh network topologies

    NASA Astrophysics Data System (ADS)

    Farina, J.; Khomchenko, D.; Yevseyenko, D.; Meester, J.; Richter, A.

    2016-02-01

    Link design, while relatively easy in the past, can become quite cumbersome with complex channel plans and equipment configurations. The task of designing optical transport systems and selecting equipment is often performed by an applications or sales engineer using simple tools, such as custom Excel spreadsheets. Eventually, every individual has their own version of the spreadsheet as well as their own methodology for building the network. This approach becomes unmanageable very quickly and leads to mistakes, bending of the engineering rules and installations that do not perform as expected. We demonstrate a comprehensive planning environment, which offers an efficient approach to unify, control and expedite the design process by controlling libraries of equipment and engineering methodologies, automating the process and providing the analysis tools necessary to predict system performance throughout the system and for all channels. In addition to the placement of EDFAs and DCEs, performance analysis metrics are provided at every step of the way. Metrics that can be tracked include power, CD and OSNR, SPM, XPM, FWM and SBS. Automated routine steps assist in design aspects such as equalization, padding and gain setting for EDFAs, the placement of ROADMs and transceivers, and creating regeneration points. DWDM networks consisting of a large number of nodes and repeater huts, interconnected in linear, branched, mesh and ring network topologies, can be designed much faster when compared with conventional design methods. Using flexible templates for all major optical components, our technology-agnostic planning approach supports the constant advances in optical communications.

  17. NASA Goddard Space Flight Center

    NASA Technical Reports Server (NTRS)

    Carter, David; Wetzel, Scott

    2000-01-01

    The NASA SLR Operational Center is responsible for: 1) NASA SLR network control, sustaining engineering, and logistics; 2) ILRS mission operations; and 3) ILRS and NASA SLR data operations. NASA SLR network control and sustaining engineering tasks include technical support, daily system performance monitoring, system scheduling, operator training, station status reporting, system relocation, logistics and support of the ILRS Networks and Engineering Working Group. These activities ensure the NASA SLR systems are meeting ILRS and NASA mission support requirements. ILRS mission operations tasks include mission planning, mission analysis, mission coordination, development of mission support plans, and support of the ILRS Missions Working Group. These activities ensure than new mission and campaign requirements are coordinated with the ILRS. Global Normal Points (NP) data, NASA SLR FullRate (FR) data, and satellite predictions are managed as part of data operations. Part of this operation includes supporting the ILRS Data Formats and Procedures Working Group. Global NP data operations consist of receipt, format and data integrity verification, archiving and merging. This activity culminates in the daily electronic transmission of NP files to the CDDIS. Currently of all these functions are automated. However, to ensure the timely and accurate flow of data, regular monitoring and maintenance of the operational software systems, computer systems and computer networking are performed. Tracking statistics between the stations and the data centers are compared periodically to eliminate lost data. Future activities in this area include sub-daily (i.e., hourly) NP data management, more stringent data integrity tests, and automatic station notification of format and data integrity issues.

  18. Avionics Simulation, Development and Software Engineering

    NASA Technical Reports Server (NTRS)

    2002-01-01

    During this reporting period, all technical responsibilities were accomplished as planned. A close working relationship was maintained with personnel of the MSFC Avionics Department Software Group (ED14), the MSFC EXPRESS Project Office (FD31), and the Huntsville Boeing Company. Accomplishments included: performing special tasks; supporting Software Review Board (SRB), Avionics Test Bed (ATB), and EXPRESS Software Control Panel (ESCP) activities; participating in technical meetings; and coordinating issues between the Boeing Company and the MSFC Project Office.

  19. Current implementation and future plans on new code architecture, programming language and user interface

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brun, B.

    1997-07-01

    Computer technology has improved tremendously during the last years with larger media capacity, memory and more computational power. Visual computing with high-performance graphic interface and desktop computational power have changed the way engineers accomplish everyday tasks, development and safety studies analysis. The emergence of parallel computing will permit simulation over a larger domain. In addition, new development methods, languages and tools have appeared in the last several years.

  20. Development of a Work Control System for Propulsion Testing at NASA Stennis

    NASA Technical Reports Server (NTRS)

    Messer, Elizabeth A.

    2005-01-01

    In 1996 Stennis Space Center was given management authority for all Propulsion Testing for NASA. Over the next few years several research and development (R&D) test facilities were completed and brought up to full operation in what is known as the E-Complex Test Facility at Stennis Space Center. To construct, activate and operate these test facilities, a manual paper-based work control system was created. After utilizing this paper-based work control system for approximately three years, it became apparent that the research and development test area needed a better method to execute, monitor, and report on tasks required to further propulsion testing. The paper based system did not provide the engineers adequate visibility into work tasks or the tracking of testing or hardware discrepancies. This system also restricted the engineer s ability to utilize and access past knowledge and experiences given the severe schedule limitations for most R&D propulsion testing projects. Therefore a system was developed to meet the growing need of Test Operations called the Propulsion Test Directorate (PTD) Work Control System. This system is used to plan, perform, and track tasks that support testing and also to capture lessons learned while doing so.

  1. 2015 Space Human Factors Engineering Standing Review Panel

    NASA Technical Reports Server (NTRS)

    Steinberg, Susan

    2015-01-01

    The 2015 Space Human Factors Engineering (SHFE) Standing Review Panel (from here on referred to as the SRP) met for a site visit in Houston, TX on December 2 - 3, 2015. The SRP reviewed the updated research plans for the Risk of Inadequate Design of Human and Automation/Robotic Integration (HARI Risk), the Risk of Inadequate Human-Computer Interaction (HCI Risk), and the Risk of Inadequate Mission, Process and Task Design (MPTask Risk). The SRP also received a status update on the Risk of Incompatible Vehicle/Habitat Design (Hab Risk) and the Risk of Performance Errors Due to Training Deficiencies (Train Risk). The SRP is pleased with the progress and responsiveness of the SHFE team. The presentations were much improved this year. The SRP is also pleased with the human-centered design approach. Below are some of the more extensive comments from the SRP. We have also made comments in each section concerning gaps/tasks in each. The comments below reflect more significant changes that impact more than just one particular section.

  2. A virtual laboratory for neutron and synchrotron strain scanning

    NASA Astrophysics Data System (ADS)

    James, J. A.; Santisteban, J. R.; Edwards, L.; Daymond, M. R.

    2004-07-01

    The new generation of dedicated Engineering Strain Scanners at neutron and synchrotron facilities offer considerable improvements in both counting time and spatial resolution. In order to make full use of these advances in instrumentation, the routine tasks associated with setting up measurement runs and analysing the data need to be made as efficient as possible. Such tasks include the planning of the experiment, the alignment and positioning of the specimen, the least-squares refinement of diffraction spectra, the definition of strain in the sample coordinate system, and its visualization within a 3D model of the specimen. With this aim in mind, we have written a software providing support for most of these operations. The approach is based on a virtual lab consisting of 3D models of the sample and laboratory equipment. The system has been developed for ENGIN-X, the new engineering strain scanner recently commissioned at ISIS, but it is flexible enough to be ported to other neutron or synchrotron strain scanners. The software has been designed with visiting industrial and academic researchers in mind, users who need to be able to control the instrument after only a short period of training.

  3. A Human Factors Analysis of EVA Time Requirements

    NASA Technical Reports Server (NTRS)

    Pate, Dennis W.

    1997-01-01

    Human Factors Engineering (HFE) is a discipline whose goal is to engineer a safer, more efficient interface between humans and machines. HFE makes use of a wide range of tools and techniques to fulfill this goal. One of these tools is known as motion and time study, a technique used to develop time standards for given tasks. During the summer of 1995, a human factors motion and time study was initiated with the goals of developing a database of EVA task times and developing a method of utilizing the database to predict how long an EVA should take. Initial development relied on the EVA activities performed during the STS-61 (Hubble) mission. The first step of the study was to become familiar with EVA's, the previous task-time studies, and documents produced on EVA's. After reviewing these documents, an initial set of task primitives and task-time modifiers was developed. Data was collected from videotaped footage of two entire STS-61 EVA missions and portions of several others, each with two EVA astronauts. Feedback from the analysis of the data was used to further refine the primitives and modifiers used. The project was continued during the summer of 1996, during which data on human errors was also collected and analyzed. Additional data from the STS-71 mission was also collected. Analysis of variance techniques for categorical data was used to determine which factors may affect the primitive times and how much of an effect they have. Probability distributions for the various task were also generated. Further analysis of the modifiers and interactions is planned.

  4. Creating Simple Windchill Admin Tools Using Info*Engine

    NASA Technical Reports Server (NTRS)

    Jones, Corey; Kapatos, Dennis; Skradski, Cory

    2012-01-01

    Being a Windchill administrator often requires performing simple yet repetitive tasks on large sets of objects. These can include renaming, deleting, checking in, undoing checkout, and much more. This is especially true during a migration. Fortunately, PTC has provided a simple way to dynamically interact with Windchill using Info*Engine. This presentation will describe how to create simple Info*Engine tasks capable of saving Windchill 10.0 administrators hours of tedious work. It will also show how these tasks can be combined and displayed on a simple JSP page that acts as a "Windchill Administrator Dashboard/Toolbox". The attendee will learn some valuable tasks Info*Engine capable of performing. The attendee will gain a basic understanding of how to perform and implement Info*Engine tasks. The attendee will learn what's involved in creating a JSP page that displays Info*Engine tasks

  5. 78 FR 15110 - Aviation Rulemaking Advisory Committee; Engine Bird Ingestion Requirements-New Task

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-08

    ...: During the bird-ingestion rulemaking database (BRDB) working group`s reevaluation of the current engine... engine core ingestion. If the BRDB working group`s reevaluation determines that such requirements are... Task ARAC accepted the task and will establish the Engine Harmonization Working Group (EHWG), under the...

  6. TH-D-BRB-04: Pinnacle Scripting: Improving Efficiency While Maintaining Safety

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Moore, J.

    2016-06-15

    Scripting capabilities and application programming interfaces (APIs) are becoming commonly available in modern treatment planning systems. These links to the treatment planning system (TPS) allow users to read data from the TPS, and in some cases use TPS functionality and write data back to the TPS. Such tools are powerful extensions, allowing automation of routine clinical tasks and supporting research, particularly research involving repetitive tasks on large patient populations. The data and functionality exposed by scripting/API capabilities is vendor dependent, as are the languages used by script/API engines, such as the Microsoft .NET framework or Python. Scripts deployed in amore » clinical environment must be commissioned and validated like any other software tool. This session will provide an overview of scripting applications and a discussion of best practices, followed by a practical introduction to the scripting capabilities of three commercial treatment planning systems. Learning Objectives: Understand the scripting capabilities available in several treatment planning systems Learn how to get started using scripting capabilities Understand the best practices for safe script deployment in a clinical environment R. Popple, Varian Medical Systems has provided research support unrelated to the topic of this session.R. Cardan, Varian Medical Systems for grant research, product evaluation, and teaching honorarium.« less

  7. Update on SLD Engineering Tools Development

    NASA Technical Reports Server (NTRS)

    Miller, Dean R.; Potapczuk, Mark G.; Bond, Thomas H.

    2004-01-01

    The airworthiness authorities (FAA, JAA, Transport Canada) will be releasing a draft rule in the 2006 timeframe concerning the operation of aircraft in a Supercooled Large Droplet (SLD) environment aloft. The draft rule will require aircraft manufacturers to demonstrate that their aircraft can operate safely in an SLD environment for a period of time to facilitate a safe exit from the condition. It is anticipated that aircraft manufacturers will require a capability to demonstrate compliance with this rule via experimental means (icing tunnels or tankers) and by analytical means (ice prediction codes). Since existing icing research facilities and analytical codes were not developed to account for SLD conditions, current engineering tools are not adequate to support compliance activities in SLD conditions. Therefore, existing capabilities need to be augmented to include SLD conditions. In response to this need, NASA and its partners conceived a strategy or Roadmap for developing experimental and analytical SLD simulation tools. Following review and refinement by the airworthiness authorities and other international research partners, this technical strategy has been crystallized into a project plan to guide the SLD Engineering Tool Development effort. This paper will provide a brief overview of the latest version of the project plan and technical rationale, and provide a status of selected SLD Engineering Tool Development research tasks which are currently underway.

  8. Mission planning for autonomous systems

    NASA Technical Reports Server (NTRS)

    Pearson, G.

    1987-01-01

    Planning is a necessary task for intelligent, adaptive systems operating independently of human controllers. A mission planning system that performs task planning by decomposing a high-level mission objective into subtasks and synthesizing a plan for those tasks at varying levels of abstraction is discussed. Researchers use a blackboard architecture to partition the search space and direct the focus of attention of the planner. Using advanced planning techniques, they can control plan synthesis for the complex planning tasks involved in mission planning.

  9. Technology Reinvestment Project Manufacturing Education and Training. Volume 1

    NASA Technical Reports Server (NTRS)

    Schroer, Bernard J.; Bond, Arthur J.

    1997-01-01

    The manufacturing education program is a joint program between the University of Alabama in Huntsville's (UAH) College of Engineering and Alabama A&M University's (AAMLJ) School of Engineering and Technology. The objective of the program is to provide more hands-on experiences to undergraduate engineering and engineering technology students. The scope of work consisted of. Year 1, Task 1: Review courses at Alabama Industrial Development Training (AIDT); Task 2: Review courses at UAH and AAMU; Task 3: Develop new lab manuals; Task 4: Field test manuals; Task 5: Prepare annual report. Year 2, Task 1: Incorporate feedback into lab manuals; Task 2 : Introduce lab manuals into classes; Task 3: Field test manuals; Task 4: Prepare annual report. Year 3, Task 1: Incorporate feedback into lab manuals; Task 2: Introduce lab manuals into remaining classes; Task 3: Conduct evaluation with assistance of industry; Task 4: Prepare final report. This report only summarizes the activities of the University of Alabama in Huntsville. The activities of Alabama A&M University are contained in a separate report.

  10. A report on the USL NASA/RECON project. Part 1: The development of a transportable, university level, IS and R educational program

    NASA Technical Reports Server (NTRS)

    Dominick, Wayne D. (Editor); Gallagher, Suzy; Granier, Martin

    1984-01-01

    A project is described which has as its goal the production of a set of system-independent, discipline-independent, transportable college level courses to educate science and engineering students in the use of large-scale information storage and retrieval systems. This project is being conducted with the cooperation and sponsorship of NASA by R and D teams at the University of Southwest Louisiana and Southern University. Chapter 1 is an introduction, providing an overview and a listing of the management phases. Chapter 2 furnishes general information regarding accomplishments in areas under development. Chapter 3 deals with the development of the course materials by presenting a series of diagrams and keys to depict the progress and interrelationships of various tasks and sub-tasks. Chapter 4 presents plans for activities to be conducted to complete and deliver course materials. The final chapter is a summary of project objectives, methods, plans, and accomplishments.

  11. Advanced research to qualify man for long term weightlessness.

    NASA Technical Reports Server (NTRS)

    Jones, W. L.

    1972-01-01

    NASA is in the process of conducting a broad program of research and development of technology to qualify, support, and permit the successful use of man in long-term space flight. The technological tasks include human engineering, extravehicular engineering, life support, and human research to assess the effect of space stresses on human physiology and psychology. Various testing techniques that are being used may have future relevance to world health. These include a biocybernetic approach to the study of cardiovascular stresses, measurement of blood flow by means of the Doppler effect, and a device for simulating radiation dosages similar to those produced in solar flares. The planned program includes a study of both humans and animals.

  12. Support to NASA's Advanced Space Technology Program

    NASA Technical Reports Server (NTRS)

    Goetz, Otto; Thomas, John; Lee, Thomas J.

    2000-01-01

    During the period of May through September 2000, Lee & Associates, LLC completed the following tasks as specified in the purchase order SOW: Assessment of current processes and structure and recommended improvements; Reviewed and commented on restructure options; Participated in closure of the Fastrac Delta Critical Design Review actions; Participated in the Fastrac Test readiness review (TRR) process for test planned at SSC and Rocketdyne; and Participated in the investigation of any anomalies identified during the Fastrac engine test data reviews.

  13. Application of Concurrent Engineering Methods to the Design of an Autonomous Aerial Robot

    DTIC Science & Technology

    1991-12-01

    power within the system, either airborne or at a ground station, was left to the team’s discretion. Data link from the aerial vehicle to the ground...Design Process 1 4 10 0% Conceptual 100% Preliminary 100% Detailed 100% Design Freedom Kowledge About the Design TIME INTO THE DESIGN PROCESS Figure 15...mission planning and control tasks was accomplished. Key system issues regarding power up and component initialization procedures began to be addressed

  14. Effects of Planning on Task Load, Knowledge, and Tool Preference: A Comparison of Two Tools

    ERIC Educational Resources Information Center

    Bonestroo, Wilco J.; de Jong, Ton

    2012-01-01

    Self-regulated learners are expected to plan their own learning. Because planning is a complex task, it is not self-evident that all learners can perform this task successfully. In this study, we examined the effects of two planning support tools on the quality of created plans, planning behavior, task load, and acquired knowledge. Sixty-five…

  15. Spacecraft systems engineering: An introduction to the process at GSFC

    NASA Technical Reports Server (NTRS)

    Fragomeni, Tony; Ryschkewitsch, Michael G.

    1993-01-01

    The main objective in systems engineering is to devise a coherent total system design capable of achieving the stated requirements. Requirements should be rigid. However, they should be continuously challenged, rechallenged and/or validated. The systems engineer must specify every requirement in order to design, document, implement and conduct the mission. Each and every requirement must be logically considered, traceable and evaluated through various analysis and trade studies in a total systems design. Margins must be determined to be realistic as well as adequate. The systems engineer must also continuously close the loop and verify system performance against the requirements. The fundamental role of the systems engineer, however, is to engineer, not manage. Yet, in large, complex missions, where more than one systems engineer is required, someone needs to manage the systems engineers, and we call them 'systems managers.' Systems engineering management is an overview function which plans, guides, monitors and controls the technical execution of a project as implemented by the systems engineers. As the project moves on through Phases A and B into Phase C/D, the systems engineering tasks become a small portion of the total effort. The systems management role increases since discipline subsystem engineers are conducting analyses and reviewing test data for final review and acceptance by the systems managers.

  16. Groundwater monitoring well assessment final work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-10-01

    Jacobs Engineering Group Inc. (JEG) has been contracted by Environmental Management Operations (EMO) to develop and implement a Groundwater Monitoring Well Assessment Plan for Canal Creek in the Edgewood Area of Aberdeen Proving Ground (APG-EA). The task will be performed under the provisions of Master Agreement 071914-A-D7, Task Order 142133. The project consists of assessing the condition of existing groundwater monitoring wells in the Canal Creek Area prior to a groundwater sampling program. The following Work Plan describes the technical approach that will be used to conduct field work for the project. Integrity of some monitoring wells installed at APG-EAmore » has come into question because of problems with well completions that were detected in wells at the O-field Study Area during a recent sampling event. Because of this, EPA and APG-DSHE officials have requested a well integrity assessment for a percentage of 168 monitoring wells installed at the Canal Creek Study Area(14 by USATHAMA, 152 by USGS). Results of the well assessment will be used to determine if these wells were completed in a fashion that minimizes the potential for either cross-contamination of aquifers or leakage of water from the surface into the well.« less

  17. Center Planning and Development Student Engineer at KSC

    NASA Technical Reports Server (NTRS)

    Jenkins, Kenneth T., Jr.

    2015-01-01

    This summer I was the Student Trainee (Engineering) Pathways Intern (co-op) at the Kennedy Space Center (KSC) in the Center Planning & Development (CPD) Directorate. CPD works with commercial companies who are interested in using KSC's unique capabilities for spaceflight, spacecraft processing, ground systems and Research & Development (R&D) projects that fall in line with NASA's Mission and Vision. CPD is divided into three (3) groups: (1) AD-A, which works on the Master Planning for the center, (2) AD-B (where I am), which works on project control, management and integration, and (3) AD-C, which works on partnership development. CPD's main goal is to make KSC the world's preeminent multi-user spaceport and maintain the center as a leader in space exploration. CPD is a very diverse group of employees having a wide knowledge of not only the Space Shuttle, but also Expendable Launch Vehicles (ELV). The director of CPD, Scott Colloredo, is on the advisory board for Commercial Space Operations (CSO) and has a degree from ERAU. I worked on a number of different tasks for AD-B, as well as CPD, that includes, but not limited to: reviewing and reissuing engineering documents, weekly notes for CPD and senior management, engineering familiarizations with facilities at KSC, leading a tour for the Embry-Riddle Aeronautical University Career Services office, and working on actual agreements/proposals that will be used in the partnership process with multiple partners, along with other projects. Most of the work I have done is sensitive information and cannot be disclosed.

  18. Encoding and choice in the task span paradigm.

    PubMed

    Reiman, Kaitlin M; Weaver, Starla M; Arrington, Catherine M

    2015-03-01

    Cognitive control during sequences of planned behaviors requires both plan-level processes such as generating, maintaining, and monitoring the plan, as well as task-level processes such as selecting, establishing and implementing specific task sets. The task span paradigm (Logan in J Exp Psychol Gen 133:218-236, 2004) combines two common cognitive control paradigms, task switching and working memory span, to investigate the integration of plan-level and task-level processes during control of sequential behavior. The current study expands past task span research to include measures of encoding processes and choice behavior with volitional sequence generation, using the standard task span as well as a novel voluntary task span paradigm. In two experiments, we consider how sequence complexity, defined separately for plan-level and task-level complexity, influences sequence encoding (Experiment 1), sequence choice (Experiment 2), sequence memory, and task performance of planned sequences of action. Results indicate that participants were sensitive to sequence complexity, but that different aspects of behavior are most strongly influenced by different types of complexity. Hierarchical complexity at the plan level best predicts voluntary sequence generation and memory; while switch frequency at the task level best predicts encoding of externally defined sequences and task performance. Furthermore, performance RTs were similar for externally and internally defined plans, whereas memory was improved for internally defined sequences. Finally, participants demonstrated a significant sequence choice bias in the voluntary task span. Consistent with past research on choice behavior, volitional selection of plans was markedly influenced by both the ease of memory and performance.

  19. The future-orientation of memory: Planning as a key component mediating the high levels of recall found with survival processing

    PubMed Central

    Klein, Stanley B.; Robertson, Theresa E.; Delton, Andrew W.

    2013-01-01

    In a series of papers, Nairne and colleagues have demonstrated that tasks encouraging participants to judge words for relevance to survival led to better recall than did tasks lacking survival relevance. Klein, Robertson, and Delton (2010) presented data suggesting that the future-directed temporal orientation of the survival task (e.g., planning), rather than survival per se, accounts for the good recall found with the task. In the present studies we manipulated the amount of survival and planning processing encouraged by a set of encoding tasks. Participants performed tasks that encouraged processing stimuli for their relevance to (a) both survival and planning, (b) planning, but not survival, or (c) survival but not planning. We predicted, and found, that recall performance associated with tasks encouraging planning (i.e., survival with planning and planning without survival) should exceed tasks that encouraged survival but not planning (i.e., survival without planning). We draw several conclusions. First, planning is a necessary component of the superior recall found in the survival paradigm. Second, memory, from an evolutionary perspective, is inherently prospective—tailored by natural selection to support future decisions and judgements that cannot be known in advance with certainty. PMID:21229456

  20. Action planning and position sense in children with Developmental Coordination Disorder.

    PubMed

    Adams, Imke L J; Ferguson, Gillian D; Lust, Jessica M; Steenbergen, Bert; Smits-Engelsman, Bouwien C M

    2016-04-01

    The present study examined action planning and position sense in children with Developmental Coordination Disorder (DCD). Participants performed two action planning tasks, the sword task and the bar grasping task, and an active elbow matching task to examine position sense. Thirty children were included in the DCD group (aged 6-10years) and age-matched to 90 controls. The DCD group had a MABC-2 total score ⩽5th percentile, the control group a total score ⩾25th percentile. Results from the sword-task showed that children with DCD planned less for end-state comfort. On the bar grasping task no significant differences in planning for end-state comfort between the DCD and control group were found. There was also no significant difference in the position sense error between the groups. The present study shows that children with DCD plan less for end-state comfort, but that this result is task-dependent and becomes apparent when more precision is needed at the end of the task. In that respect, the sword-task appeared to be a more sensitive task to assess action planning abilities, than the bar grasping task. The action planning deficit in children with DCD cannot be explained by an impaired position sense during active movements. Copyright © 2016 Elsevier B.V. All rights reserved.

  1. Rocketdyne Safety Algorithm: Space Shuttle Main Engine Fault Detection

    NASA Technical Reports Server (NTRS)

    Norman, Arnold M., Jr.

    1994-01-01

    The Rocketdyne Safety Algorithm (RSA) has been developed to the point of use on the TTBE at MSFC on Task 4 of LeRC contract NAS3-25884. This document contains a description of the work performed, the results of the nominal test of the major anomaly test cases and a table of the resulting cutoff times, a plot of the RSA value vs. time for each anomaly case, a logic flow description of the algorithm, the algorithm code, and a development plan for future efforts.

  2. Space station definition and preliminary design, WP-01. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    Lenda, J. A.

    1987-01-01

    System activities are summarized and an overview of the system level engineering tasks performed are provided. Areas discussed include requirements, system test and verification, the advanced development plan, customer accommodations, software, growth, productivity, operations, product assurance and metrication. The hardware element study results are summarized. Overviews of recommended configurations are provided for the core module, the USL, the logistics elements, the propulsion subsystems, reboost, vehicle accommodations, and the smart front end. A brief overview is provided for costing activities.

  3. Selected Works in Water Supply, Water Conservation and Water Quality Planning.

    DTIC Science & Technology

    1981-05-01

    of change (1970- 1980 ). The Institute’s work reflects the fact that the Corps of Engineers is not a novice in the business of providing water supply for...Urban Water Supply of the Task Force was chaired by the Secretary of the Army. The Subcommittee produced a report on 6 June 1980 evaluating urban water...persuant to the President’s Water Pvizcy message to Congress in 1978. The two other reports were published in 1980 and are discussed below. IWR staff

  4. Proceedings of the National Forum on Human Resources Planning (2nd) Held in McLean, Virginia on 8-9 May 1986.

    DTIC Science & Technology

    1986-05-09

    obsePrimary contributiOnS oare (1) m- day experience confirms the influence ot con- tingent consequences. For example , busy ex - recognition of the...influence each other. For ex - haviorism. A practical example of Bandura’s ample, at a societal level we are held account- position is the salesperson who...human resources management constitute an example . . . industrial engineering applications to the complex task of annually sizing an international force

  5. Space Science

    NASA Image and Video Library

    2003-06-01

    NASA’s Virtual Glovebox (VGX) was developed to allow astronauts on Earth to train for complex biology research tasks in space. The astronauts may reach into the virtual environment, naturally manipulating specimens, tools, equipment, and accessories in a simulated microgravity environment as they would do in space. Such virtual reality technology also provides engineers and space operations staff with rapid prototyping, planning, and human performance modeling capabilities. Other Earth based applications being explored for this technology include biomedical procedural training and training for disarming bio-terrorism weapons.

  6. Early Identification of SE-Related Program Risks: Opportunities for DoD Systems Engineering (SE) Transformation via SE Effectiveness Measures (EMs) and Evidence-Based Reviews

    DTIC Science & Technology

    2009-09-30

    development of feasibility evidence for a 100-KSLOC project . It is good to note that the “sweet spots” are...incomplete without the FED, it becomes a first-class project deliverable. This implies that it needs a plan for its development , and that each task in...effective in supporting an aerospace flight hardware program at NASA; however, differences in the models used for project development and

  7. Release Fixed Heel Point (FHP) Accommodation Model Verification and Validation (V and V) Plan - Rev A

    DTIC Science & Technology

    2017-01-23

    5e. TASK NUMBER N/A 5f. WORK UNIT NUMBER N/A 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) AND ADDRESS(ES) RDECOM-TARDEC-ACT Attn...occupant work space, central 90% of the Soldier population, encumbrance, posture and position, verification and validation, computer aided design...factors engineers could benefit by working with vehicle designers to perform virtual assessments in CAD when there is not enough time and/or funding to

  8. Virtual Glovebox (VGX) Aids Astronauts in Pre-Flight Training

    NASA Technical Reports Server (NTRS)

    2003-01-01

    NASA's Virtual Glovebox (VGX) was developed to allow astronauts on Earth to train for complex biology research tasks in space. The astronauts may reach into the virtual environment, naturally manipulating specimens, tools, equipment, and accessories in a simulated microgravity environment as they would do in space. Such virtual reality technology also provides engineers and space operations staff with rapid prototyping, planning, and human performance modeling capabilities. Other Earth based applications being explored for this technology include biomedical procedural training and training for disarming bio-terrorism weapons.

  9. Assessment of planning abilities in individuals with mild cognitive impairment using an open-ended problem-solving task.

    PubMed

    Sanders, Chad; Low, Christina; Schmitter-Edgecombe, Maureen

    2014-01-01

    There is currently limited research evaluating planning abilities, a core subcomponent of executive functioning, in individuals with mild cognitive impairment (MCI). In the present study, we utilized the "Amap Task," an open-ended problem-solving task, to separately evaluate the formulation and execution components of planning ability in individuals with MCI. Thirty-seven cognitively healthy older adults and 37 individuals with MCI used a map layout of a university apartment to develop and write out a strategy (formulation stage) to successfully complete a list of tasks (e.g., retrieve and fill a water pitcher before placing it in the refrigerator). Subsequently, participants carried out the tasks in the apartment with the aid of their formulated plan (execution stage). MCI participants performed more poorly than older adult (OA) controls during both the formulation and execution stages on measures of task accuracy and task efficiency. However, both groups were able to adjust and improve task accuracy and efficiency from formulation to task execution. Finally, MCI participants took significantly longer to complete the task and adhered less to their formulated plans during task completion. Using an open-ended problem-solving task, the findings revealed that individuals with MCI experienced difficulties with both the formulation and execution components of planning. Like controls, participants with MCI were able to successfully modify their plan online, improving their performance from task formulation to task execution.

  10. An efficient temporal logic for robotic task planning

    NASA Technical Reports Server (NTRS)

    Becker, Jeffrey M.

    1989-01-01

    Computations required for temporal reasoning can be prohibitively expensive if fully general representations are used. Overly simple representations, such as totally ordered sequence of time points, are inadequate for use in a nonlinear task planning system. A middle ground is identified which is general enough to support a capable nonlinear task planner, but specialized enough that the system can support online task planning in real time. A Temporal Logic System (TLS) was developed during the Intelligent Task Automation (ITA) project to support robotic task planning. TLS is also used within the ITA system to support plan execution, monitoring, and exception handling.

  11. The Effects of Pre-Task Planning and On-line Planning on Fluency, Complexity, and Accuracy in L2 Monologic Oral Production.

    ERIC Educational Resources Information Center

    Yuan, Fangyuan; Ellis, Rod

    2003-01-01

    Investigated the effects of both pre-task and on-line planning on second language (L2) oral production. Results show that pre-task planning enhances grammatical complexity while on-line planning positively influences accuracy and grammatical complexity. Pre-task planners also produced more fluent and lexically varied language than the on-line…

  12. Light Water Reactor Sustainability Program A Reference Plan for Control Room Modernization: Planning and Analysis Phase

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jacques Hugo; Ronald Boring; Lew Hanes

    2013-09-01

    The U.S. Department of Energy’s Light Water Reactor Sustainability (LWRS) program is collaborating with a U.S. nuclear utility to bring about a systematic fleet-wide control room modernization. To facilitate this upgrade, a new distributed control system (DCS) is being introduced into the control rooms of these plants. The DCS will upgrade the legacy plant process computer and emergency response facility information system. In addition, the DCS will replace an existing analog turbine control system with a display-based system. With technology upgrades comes the opportunity to improve the overall human-system interaction between the operators and the control room. To optimize operatormore » performance, the LWRS Control Room Modernization research team followed a human-centered approach published by the U.S. Nuclear Regulatory Commission. NUREG-0711, Rev. 3, Human Factors Engineering Program Review Model (O’Hara et al., 2012), prescribes four phases for human factors engineering. This report provides examples of the first phase, Planning and Analysis. The three elements of Planning and Analysis in NUREG-0711 that are most crucial to initiating control room upgrades are: • Operating Experience Review: Identifies opportunities for improvement in the existing system and provides lessons learned from implemented systems. • Function Analysis and Allocation: Identifies which functions at the plant may be optimally handled by the DCS vs. the operators. • Task Analysis: Identifies how tasks might be optimized for the operators. Each of these elements is covered in a separate chapter. Examples are drawn from workshops with reactor operators that were conducted at the LWRS Human System Simulation Laboratory HSSL and at the respective plants. The findings in this report represent generalized accounts of more detailed proprietary reports produced for the utility for each plant. The goal of this LWRS report is to disseminate the technique and provide examples sufficient to serve as a template for other utilities’ projects for control room modernization.« less

  13. Advanced Launch System propulsion focused technology liquid methane turbopump technical implementation plan

    NASA Technical Reports Server (NTRS)

    Csomor, A.; Nielson, C. E.

    1989-01-01

    This program will focus on the integration of all functional disciplines of the design, manufacturing, materials, fabrication and producibility to define and demonstrate a highly reliable, easily maintained, low cost liquid methane turbopump as a component for the STBE (Space Transportation Booster Engine) using the STME (main engine) oxygen turbopump. A cost model is to be developed to predict the recurring cost of production hardware and operations. A prime objective of the program is to design the liquid methane turbopump to be used in common with a LH2 turbopump optimized for the STME. Time phasing of the effort is presented and interrelationship of the tasks is defined. Major subcontractors are identified and their roles in the program are described.

  14. Translating Vision into Design: A Method for Conceptual Design Development

    NASA Technical Reports Server (NTRS)

    Carpenter, Joyce E.

    2003-01-01

    One of the most challenging tasks for engineers is the definition of design solutions that will satisfy high-level strategic visions and objectives. Even more challenging is the need to demonstrate how a particular design solution supports the high-level vision. This paper describes a process and set of system engineering tools that have been used at the Johnson Space Center to analyze and decompose high-level objectives for future human missions into design requirements that can be used to develop alternative concepts for vehicles, habitats, and other systems. Analysis and design studies of alternative concepts and approaches are used to develop recommendations for strategic investments in research and technology that support the NASA Integrated Space Plan. In addition to a description of system engineering tools, this paper includes a discussion of collaborative design practices for human exploration mission architecture studies used at the Johnson Space Center.

  15. Feasibility study for early removal of HEU from CPP-651-Phase II

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith, C.V.; Henry, R.; Milligan, C.

    1997-09-01

    A two-phase feasibility study was initiated in late 1996 to identify a way to expedite the removal of SNM from the CPP-651 vault. The first phase of this study provided preliminary information that appeared promising, but needed additional detailed planning and evaluate to validate the concepts and conclusions. The focus of Phase 2 was to provide the validation via resource-loaded schedules and more detailed cost estimates. Section 1 describes the purpose and objectives of the Phase 2 tasks and the programmatic drivers that influence related CPP-651 high-enriched uranium (HEU) management issues. Section 2 identifies the evaluation criteria and methodology andmore » the transfer issues and barriers preventing shipment. Section 3 provides site-specific background information for the CPP-651 facility and the Idaho National Engineering and Environmental Laboratory (INEEL) and describes the development of the basic material removal schedule, the proposed base case plan for removal of SNM, and the proposed HEU material management/shipping issues and strategies. Section 4 identifies the proposed options for accelerated removal of SNM and how they were evaluated via detailed scheduling, resource histograms, and cost analysis. Section 5 summarizes principal tasks for implementing this plan and other related HEU CPP-651 management issues that require continued planning efforts to assure successful implementation of this proposed early removal strategy.« less

  16. Orbit transfer rocket engine technology program

    NASA Technical Reports Server (NTRS)

    Gustafson, N. B.; Harmon, T. J.

    1993-01-01

    An advanced near term (1990's) space-based Orbit Transfer Vehicle Engine (OTVE) system was designed, and the technologies applicable to its construction, maintenance, and operations were developed under Tasks A through F of the Orbit Transfer Rocket Engine Technology Program. Task A was a reporting task. In Task B, promising OTV turbomachinery technologies were explored: two stage partial admission turbines, high velocity ratio diffusing crossovers, soft wear ring seals, advanced bearing concepts, and a rotordynamic analysis. In Task C, a ribbed combustor design was developed. Possible rib and channel geometries were chosen analytically. Rib candidates were hot air tested and laser velocimeter boundary layer analyses were conducted. A channel geometry was also chosen on the basis of laser velocimeter data. To verify the predicted heat enhancement effects, a ribbed calorimeter spool was hot fire tested. Under Task D, the optimum expander cycle engine thrust, performance and envelope were established for a set of OTV missions. Optimal nozzle contours and quick disconnects for modularity were developed. Failure Modes and Effects Analyses, maintenance and reliability studies and component study results were incorporated into the engine system. Parametric trades on engine thrust, mixture ratio, and area ratio were also generated. A control system and the health monitoring and maintenance operations necessary for a space-based engine were outlined in Task E. In addition, combustor wall thickness measuring devices and a fiberoptic shaft monitor were developed. These monitoring devices were incorporated into preflight engine readiness checkout procedures. In Task F, the Integrated Component Evaluator (I.C.E.) was used to demonstrate performance and operational characteristics of an advanced expander cycle engine system and its component technologies. Sub-system checkouts and a system blowdown were performed. Short transitions were then made into main combustor ignition and main stage operation.

  17. Results for the Fourth Quarter Calendar Year 2015 Tank 50H Salt Solution Sample

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Crawford, C.

    In this memorandum, the chemical and radionuclide contaminant results from the Fourth Quarter Calendar Year 2015 (CY15) sample of Tank 50H salt solution are presented in tabulated form. The Fourth Quarter CY15 Tank 50H samples were obtained on October 29, 2015 and received at Savannah River National Laboratory (SRNL) on October 30, 2015. The information from this characterization will be used by Defense Waste Processing Facility (DWPF) & Saltstone Facility Engineering for the transfer of aqueous waste from Tank 50H to the Salt Feed Tank in the Saltstone Production Facility, where the waste will be treated and disposed of inmore » the Saltstone Disposal Facility. This memorandum compares results, where applicable, to Saltstone Waste Acceptance Criteria (WAC) limits and targets. Data pertaining to the regulatory limits for Resource Conservation and Recovery Act (RCRA) metals will be documented at a later time per the Task Technical and Quality Assurance Plan (TTQAP) for the Tank 50H saltstone task. The chemical and radionuclide contaminant results from the characterization of the Fourth Quarter Calendar Year 2015 (CY15) sampling of Tank 50H were requested by SRR personnel and details of the testing are presented in the SRNL Task Technical and Quality Assurance Plan.« less

  18. [Urban construction, professions, and immigration at the origin of urban studies in Venezuela, 1870-1957].

    PubMed

    Martin Frechilla, J J

    1996-01-01

    The individuals and circumstances involved in the creation of the first graduate urban studies program in Venezuela are recalled, beginning with the odernization of Caracas under the impulse of President Antonio Guzman Blanco, elected in 1870. Guzman Blanco converted himself into Venezuela's first urbanist with the establishment of organizational frameworks and completion of massive public works projects, which were based largely on the urban models of the US and Europe. Engineering and public health were consolidated as the two most influential sources of professional competence for guiding urban development. By the mid-1930s, growth fueled by petroleum revenues was causing rapid urbanization, and it became apparent that trained professionals able to manage the increasingly complex tasks of urban planning were in short supply. A new surge of modernizing construction began in 1936 and led to a cooperative arrangement with a French firm, whose personnel were to be required to train Venezuelan engineers for future service in urban planning. An influx of refugees from the Spanish Civil War and the increasing influence of urban planning processes in the US were also observed. The National Commission on Urbanism was created in 1946 as a dependency of the Ministry of Planning to facilitate public administration of the development and control of cities. Throughout the period, a debate was underway on the need for a multidisciplinary approach to urban planning versus a primarily architectural or engineering approach. In 1957, some consensus was reached on the need for urban planning to be viewed as more than a speciality of architecture. A framework was developed for a graduate program in 1969 in the Central University of Venezuela. The National Commission on Urbanism was disbanded in 1957, largely because of its excessive focus on architecture to the exclusion of other disciplines relevant to the urbanization process.

  19. EARLY ENTRANCE COPRODUCTION PLANT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    David Storm; Govanon Nongbri; Steve Decanio

    2004-01-12

    The overall objective of this project is the three phase development of an Early Entrance Coproduction Plant (EECP) which uses petroleum coke to produce at least one product from at least two of the following three categories: (1) electric power (or heat), (2) fuels, and (3) chemicals using ChevronTexaco's proprietary gasification technology. The objective of Phase I is to determine the feasibility and define the concept for the EECP located at a specific site; develop a Research, Development, and Testing (RD&T) Plan to mitigate technical risks and barriers; and prepare a Preliminary Project Financing Plan. The objective of Phase IImore » is to implement the work as outlined in the Phase I RD&T Plan to enhance the development and commercial acceptance of coproduction technology. The objective of Phase III is to develop an engineering design package and a financing and testing plan for an EECP located at a specific site. The project's intended result is to provide the necessary technical, economic, and environmental information needed by industry to move the EECP forward to detailed design, construction, and operation. The partners in this project are Texaco Energy Systems LLC or TES (a subsidiary of ChevronTexaco), General Electric (GE), Praxair, and Kellogg Brown & Root (KBR) in addition to the U.S. Department of Energy (DOE). TES is providing gasification technology and Fischer-Tropsch (F-T) technology developed by Rentech, Inc., GE is providing combustion turbine technology, Praxair is providing air separation technology, and KBR is providing engineering. During Phase I, a design basis for the Fischer-Tropsch Synthesis section was developed based on limited experience with the specified feed gas and operating conditions. The objective of this Task in Phase II RD&T work was to confirm the performance of the F-T reactor at the set design conditions. Although much of the research, development, and testing work were done by TES outside of this project, several important issues were addressed in this phase of the project. They included Rejuvenation/Regeneration of the Fischer-Tropsch Catalyst, online Catalyst Withdrawal and Addition from the synthesis reactor, and the Fischer-Tropsch Design Basis Confirmation. In Phase III the results from these RD&T work will be incorporated in developing the engineering design package. This Topical Report documents the Phase II RD&T work that was completed for this task.« less

  20. Center Planning and Development Student Engineer

    NASA Technical Reports Server (NTRS)

    Jenkins, Kenneth T.

    2013-01-01

    This fall I was the Student Trainee (Engineering) Pathways Intern (co-op) at the Kennedy Space Center (KSC) in the Center Planning Development (CPD) Directorate. CPD works with commercial companies who are interested using KSCs unique capabilities in spaceflight, spacecraft processing, ground systems and Research Development (RD) projects that fall in line with NASAs mission and goals. CPD is divided into four (4) groups: (1) AD-A, which works on the Master Planning for center, (2) AD-B (where I am), which works on project management and integration, (3) AD-C, which works on partnership development, and (4) AD-T, which works on the RD aspects of partnerships. CPDs main goal is to one day make KSC the worlds largest spaceport and maintain the center as a leader in space exploration. CPD is a very diverse group with employees having a wide knowledge of not only the Space Shuttle, but also that of the Apollo era. Our director of CPD, Scott Colloredo, is on the advisory board for Commercial Space Operations (CSO) and has a degree at ERAU. I worked on a number of different tasks for AD-B, as well as CPD, that includes, but not limited to: reviewing and reissuing engineering drawings from the Apollo and Shuttle eras, to supporting NASA rocket launches (MAVEN), and working on actual agreementsproposals that will be used in the partnership process with multiple partners. Most of the work I have done is sensitive information and cannot be disclosed.

  1. Summary of Current and Future MSFC International Space Station Environmental Control and Life Support System Activities

    NASA Technical Reports Server (NTRS)

    Ray, Charles D.; Carrasquillo, Robyn L.; Minton-Summers, Silvia

    1997-01-01

    This paper provides a summary of current work accomplished under technical task agreement (TTA) by the Marshall Space Flight Center (MSFC) regarding the Environmental Control and Life Support System (ECLSS) as well as future planning activities in support of the International Space Station (ISS). Current activities include ECLSS computer model development, component design and development, subsystem integrated system testing, life testing, and government furnished equipment delivered to the ISS program. A long range plan for the MSFC ECLSS test facility is described whereby the current facility would be upgraded to support integrated station ECLSS operations. ECLSS technology development efforts proposed to be performed under the Advanced Engineering Technology Development (AETD) program are also discussed.

  2. Task planning and control synthesis for robotic manipulation in space applications

    NASA Technical Reports Server (NTRS)

    Sanderson, A. C.; Peshkin, M. A.; Homem-De-mello, L. S.

    1987-01-01

    Space-based robotic systems for diagnosis, repair and assembly of systems will require new techniques of planning and manipulation to accomplish these complex tasks. Results of work in assembly task representation, discrete task planning, and control synthesis which provide a design environment for flexible assembly systems in manufacturing applications, and which extend to planning of manipulatiuon operations in unstructured environments are summarized. Assembly planning is carried out using the AND/OR graph representation which encompasses all possible partial orders of operations and may be used to plan assembly sequences. Discrete task planning uses the configuration map which facilitates search over a space of discrete operations parameters in sequential operations in order to achieve required goals in the space of bounded configuration sets.

  3. The Task Is Not Enough: Processing Approaches to Task-Based Performance

    ERIC Educational Resources Information Center

    Skehan, Peter; Xiaoyue, Bei; Qian, Li; Wang, Zhan

    2012-01-01

    This article reports on three research studies, all of which concern second language task performance. The first focuses on planning, and compares on-line and strategic planning as well as task repetition. The second study examines the role of familiarity on task performance, and compares this with conventional strategic planning. The third study…

  4. Tools to Support Human Factors and Systems Engineering Interactions During Early Analysis

    NASA Technical Reports Server (NTRS)

    Thronesbery, Carroll; Malin, Jane T.; Holden, Kritina; Smith, Danielle Paige

    2005-01-01

    We describe an approach and existing software tool support for effective interactions between human factors engineers and systems engineers in early analysis activities during system acquisition. We examine the tasks performed during this stage, emphasizing those tasks where system engineers and human engineers interact. The Concept of Operations (ConOps) document is an important product during this phase, and particular attention is paid to its influences on subsequent acquisition activities. Understanding this influence helps ConOps authors describe a complete system concept that guides subsequent acquisition activities. We identify commonly used system engineering and human engineering tools and examine how they can support the specific tasks associated with system definition. We identify possible gaps in the support of these tasks, the largest of which appears to be creating the ConOps document itself. Finally, we outline the goals of our future empirical investigations of tools to support system concept definition.

  5. Tools to Support Human Factors and Systems Engineering Interactions During Early Analysis

    NASA Technical Reports Server (NTRS)

    Thronesbery, Carroll; Malin, Jane T.; Holden, Kritina; Smith, Danielle Paige

    2006-01-01

    We describe an approach and existing software tool support for effective interactions between human factors engineers and systems engineers in early analysis activities during system acquisition. We examine the tasks performed during this stage, emphasizing those tasks where system engineers and human engineers interact. The Concept of Operations (ConOps) document is an important product during this phase, and particular attention is paid to its influences on subsequent acquisition activities. Understanding this influence helps ConOps authors describe a complete system concept that guides subsequent acquisition activities. We identify commonly used system engineering and human engineering tools and examine how they can support the specific tasks associated with system definition. We identify possible gaps in the support of these tasks, the largest of which appears to be creating the ConOps document itself. Finally, we outline the goals of our future empirical investigations of tools to support system concept definition.

  6. Feasibility study of an Integrated Program for Aerospace-vehicle Design (IPAD) system. Volume 6: Implementation schedule, development costs, operational costs, benefit assessment, impact on company organization, spin-off assessment, phase 1, tasks 3 to 8

    NASA Technical Reports Server (NTRS)

    Garrocq, C. A.; Hurley, M. J.; Dublin, M.

    1973-01-01

    A baseline implementation plan, including alternative implementation approaches for critical software elements and variants to the plan, was developed. The basic philosophy was aimed at: (1) a progressive release of capability for three major computing systems, (2) an end product that was a working tool, (3) giving participation to industry, government agencies, and universities, and (4) emphasizing the development of critical elements of the IPAD framework software. The results of these tasks indicate an IPAD first release capability 45 months after go-ahead, a five year total implementation schedule, and a total developmental cost of 2027 man-months and 1074 computer hours. Several areas of operational cost increases were identified mainly due to the impact of additional equipment needed and additional computer overhead. The benefits of an IPAD system were related mainly to potential savings in engineering man-hours, reduction of design-cycle calendar time, and indirect upgrading of product quality and performance.

  7. Distributing Planning and Control for Teams of Cooperating Mobile Robots

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Parker, L.E.

    2004-07-19

    This CRADA project involved the cooperative research of investigators in ORNL's Center for Engineering Science Advanced Research (CESAR) with researchers at Caterpillar, Inc. The subject of the research was the development of cooperative control strategies for autonomous vehicles performing applications of interest to Caterpillar customers. The project involved three Phases of research, conducted over the time period of November 1998 through December 2001. This project led to the successful development of several technologies and demonstrations in realistic simulation that illustrated the effectiveness of our control approaches for distributed planning and cooperation in multi-robot teams. The primary objectives of this researchmore » project were to: (1) Develop autonomous control technologies to enable multiple vehicles to work together cooperatively, (2) Provide the foundational capabilities for a human operator to exercise oversight and guidance during the multi-vehicle task execution, and (3) Integrate these capabilities to the ALLIANCE-based autonomous control approach for multi-robot teams. These objectives have been successfully met with the results implemented and demonstrated in a near real-time multi-vehicle simulation of up to four vehicles performing mission-relevant tasks.« less

  8. A novel personal health system with integrated decision support and guidance for the management of chronic liver disease.

    PubMed

    Kiefer, Stephan; Schäfer, Michael; Bransch, Marco; Brimmers, Peter; Bartolomé, Diego; Baños, Janie; Orr, James; Jones, Dave; Jara, Maximilian; Stockmann, Martin

    2014-01-01

    A personal health system platform for the management of patients with chronic liver disease that incorporates a novel approach to integrate decision support and guidance through care pathways for patients and their doctors is presented in this paper. The personal health system incorporates an integrated decision support engine that guides patients and doctors through the management of the disease by issuing tasks and providing recommendations to both the care team and the patient and by controlling the execution of a Care Flow Plan based on the results of tasks and the monitored health status of the patient. This Care Flow Plan represents a formal, business process based model of disease management designed off-line by domain experts on the basis of clinical guidelines, knowledge of care pathways and an organisational model for integrated, patient-centred care. In this way, remote monitoring and treatment are dynamically adapted to the patient's actual condition and clinical symptoms and allow flexible delivery of care with close integration of specialists, therapists and care-givers.

  9. Study of Turbofan Engines Designed for Low Enery Consumption

    NASA Technical Reports Server (NTRS)

    Neitzel, R. E.; Hirschkron, R.; Johnston, R. P.

    1976-01-01

    Subsonic transport turbofan engine design and technology features which have promise of improving aircraft energy consumption are described. Task I addressed the selection and evaluation of features for the CF6 family of engines in current aircraft, and growth models of these aircraft. Task II involved cycle studies and the evaluation of technology features for advanced technology turbofans, consistent with initial service in 1985. Task III pursued the refined analysis of a specific design of an advanced technology turbofan engine selected as the result of Task II studies. In all of the above, the impact upon aircraft economics, as well as energy consumption, was evaluated. Task IV summarized recommendations for technology developments which would be necessary to achieve the improvements in energy consumption identified.

  10. An assigned responsibility system for robotic teleoperation control.

    PubMed

    Small, Nicolas; Lee, Kevin; Mann, Graham

    2018-01-01

    This paper proposes an architecture that explores a gap in the spectrum of existing strategies for robot control mode switching in adjustable autonomy. In situations where the environment is reasonably known and/or predictable, pre-planning these control changes could relieve robot operators of the additional task of deciding when and how to switch. Such a strategy provides a clear division of labour between the automation and the human operator(s) before the job even begins, allowing for individual responsibilities to be known ahead of time, limiting confusion and allowing rest breaks to be planned. Assigned Responsibility is a new form of adjustable autonomy-based teleoperation that allows the selective inclusion of automated control elements at key stages of a robot operation plan's execution. Progression through these stages is controlled by automatic goal accomplishment tracking. An implementation is evaluated through engineering tests and a usability study, demonstrating the viability of this approach and offering insight into its potential applications.

  11. Oversight hearings on P. L. 93-577, ERDA Plan and Program. Hearings before the Subcommittee on Energy Research, Development and Demonstration of the Committee on Science and Technology, U. S. House of Representatives, Ninety-Fourth Congress, Second Session

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1976-01-01

    The purpose of the hearings was to examine the comprehensive plan and program for dealing with energy that ERDA submitted to Congress on June 30, 1975. Included as an appendix to these hearings is the October 1975 report of the Office of Technology Assessment (OTA) entitled, ''An Analysis of the ERDA Plan and Program'' (for abstract of this report, see EAPA 2:79). Testifying on Jan. 22 was the director of OTA, Emilio Q. Daddario, and chairmen of various task groups that assisted in the ERDA analysis, namely: Dr. John Gibbons, Conservation; Dr. Paul Craig, Overview Panel; Dr. Alvin Weinberg, Nuclear;more » Dr. Stanford S. Penner, Environmental and Health; and Dr. Jerry Grey, Solar; also present, and participating in the question and answer portion was Lionel Johns, head of the energy projects and programs in OTA. Testifying at the Jan. 23 hearings were experts presenting environmental, scientific, and engineering viewpoints, namely: Dr. Donald McDonald, director of the environmental studies program at Dartmouth College; Dr. Reginald Vachon, Auburn University, representing the American Society of Mechanical Engineers; and Dr. Thomas Lee, General Electric Co., representing the Inst. of Electrical and Electronics Engineers. The final hearings on Jan. 29 included the testimony of Dr. Robert W. Fri, Deputy Administrator, ERDA, and that of each of five assistant administrators: Dr. John Teem, Solar, Geothermal, and Advanced Energy Systems; Dr. Austin Heller, Conservation; Dr. Richard W. Roberts, Nuclear Energy; Dr. Roger W. A. LeGassie, Planning and Analysis; and Dr. James Liverman, Environment and Safety. (LMT)« less

  12. National facilities study. Volume 5: Space research and development facilities task group

    NASA Technical Reports Server (NTRS)

    1994-01-01

    With the beginnings of the U.S. space program, there was a pressing need to develop facilities that could support the technology research and development, testing, and operations of evolving space systems. Redundancy in facilities that was once and advantage in providing flexibility and schedule accommodation is instead fast becoming a burden on scarce resources. As a result, there is a clear perception in many sectors that the U.S. has many space R&D facilities that are under-utilized and which are no longer cost-effective to maintain. At the same time, it is clear that the U.S. continues to possess many space R&D facilities which are the best -- or among the best -- in the world. In order to remain world class in key areas, careful assessment of current capabilities and planning for new facilities is needed. The National Facility Study (NFS) was initiated in 1992 to develop a comprehensive and integrated long-term plan for future aerospace facilities that meets current and projected government and commercial needs. In order to assess the nation's capability to support space research and development (R&D), a Space R&D Task Group was formed. The Task Group was co-chaired by NASA and DOD. The Task Group formed four major, technologically- and functionally- oriented working groups: Human and Machine Operations; Information and Communications; Propulsion and Power; and Materials, Structures, and Flight Dynamics. In addition to these groups, three supporting working groups were formed: Systems Engineering and Requirements; Strategy and Policy; and Costing Analysis. The Space R&D Task Group examined several hundred facilities against the template of a baseline mission and requirements model (developed in common with the Space Operations Task Group) and a set of excursions from the baseline. The model and excursions are described in Volume 3 of the NFS final report. In addition, as a part of the effort, the group examined key strategic issues associated with space R&D facilities planning for the U.S., and these are discussed in Section 4 of this volume.

  13. 7 CFR 1717.604 - Long-range engineering plans and construction work plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...

  14. 7 CFR 1717.604 - Long-range engineering plans and construction work plans.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 11 2013-01-01 2013-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...

  15. 7 CFR 1717.604 - Long-range engineering plans and construction work plans.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 11 2014-01-01 2014-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...

  16. 7 CFR 1717.604 - Long-range engineering plans and construction work plans.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 11 2012-01-01 2012-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...

  17. 7 CFR 1717.604 - Long-range engineering plans and construction work plans.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 11 2011-01-01 2011-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...

  18. International Collaboration on Spent Fuel Disposition in Crystalline Media: FY17 Progress Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wang, Yifeng; Hadgu, Teklu; Kainina, Elena

    Active participation in international R&D is crucial for achieving the Spent Fuel Waste Science & Technology (SFWST) long-term goals of conducting “experiments to fill data needs and confirm advanced modeling approaches” and of having a “robust modeling and experimental basis for evaluation of multiple disposal system options” (by 2020). DOE’s Office of Nuclear Energy (NE) has developed a strategic plan to advance cooperation with international partners. The international collaboration on the evaluation of crystalline disposal media at Sandia National Laboratories (SNL) in FY17 focused on the collaboration through the Development of Coupled Models and their Validation against Experiments (DECOVALEX-2019) project.more » The DECOVALEX project is an international research and model comparison collaboration, initiated in 1992, for advancing the understanding and modeling of coupled thermo-hydro-mechanical-chemical (THMC) processes in geological systems. SNL has been participating in three tasks of the DECOVALEX project: Task A. Modeling gas injection experiments (ENGINEER), Task C. Modeling groundwater recovery experiment in tunnel (GREET), and Task F. Fluid inclusion and movement in the tight rock (FINITO).« less

  19. Development and tuning of an original search engine for patent libraries in medicinal chemistry.

    PubMed

    Pasche, Emilie; Gobeill, Julien; Kreim, Olivier; Oezdemir-Zaech, Fatma; Vachon, Therese; Lovis, Christian; Ruch, Patrick

    2014-01-01

    The large increase in the size of patent collections has led to the need of efficient search strategies. But the development of advanced text-mining applications dedicated to patents of the biomedical field remains rare, in particular to address the needs of the pharmaceutical & biotech industry, which intensively uses patent libraries for competitive intelligence and drug development. We describe here the development of an advanced retrieval engine to search information in patent collections in the field of medicinal chemistry. We investigate and combine different strategies and evaluate their respective impact on the performance of the search engine applied to various search tasks, which covers the putatively most frequent search behaviours of intellectual property officers in medical chemistry: 1) a prior art search task; 2) a technical survey task; and 3) a variant of the technical survey task, sometimes called known-item search task, where a single patent is targeted. The optimal tuning of our engine resulted in a top-precision of 6.76% for the prior art search task, 23.28% for the technical survey task and 46.02% for the variant of the technical survey task. We observed that co-citation boosting was an appropriate strategy to improve prior art search tasks, while IPC classification of queries was improving retrieval effectiveness for technical survey tasks. Surprisingly, the use of the full body of the patent was always detrimental for search effectiveness. It was also observed that normalizing biomedical entities using curated dictionaries had simply no impact on the search tasks we evaluate. The search engine was finally implemented as a web-application within Novartis Pharma. The application is briefly described in the report. We have presented the development of a search engine dedicated to patent search, based on state of the art methods applied to patent corpora. We have shown that a proper tuning of the system to adapt to the various search tasks clearly increases the effectiveness of the system. We conclude that different search tasks demand different information retrieval engines' settings in order to yield optimal end-user retrieval.

  20. Development and tuning of an original search engine for patent libraries in medicinal chemistry

    PubMed Central

    2014-01-01

    Background The large increase in the size of patent collections has led to the need of efficient search strategies. But the development of advanced text-mining applications dedicated to patents of the biomedical field remains rare, in particular to address the needs of the pharmaceutical & biotech industry, which intensively uses patent libraries for competitive intelligence and drug development. Methods We describe here the development of an advanced retrieval engine to search information in patent collections in the field of medicinal chemistry. We investigate and combine different strategies and evaluate their respective impact on the performance of the search engine applied to various search tasks, which covers the putatively most frequent search behaviours of intellectual property officers in medical chemistry: 1) a prior art search task; 2) a technical survey task; and 3) a variant of the technical survey task, sometimes called known-item search task, where a single patent is targeted. Results The optimal tuning of our engine resulted in a top-precision of 6.76% for the prior art search task, 23.28% for the technical survey task and 46.02% for the variant of the technical survey task. We observed that co-citation boosting was an appropriate strategy to improve prior art search tasks, while IPC classification of queries was improving retrieval effectiveness for technical survey tasks. Surprisingly, the use of the full body of the patent was always detrimental for search effectiveness. It was also observed that normalizing biomedical entities using curated dictionaries had simply no impact on the search tasks we evaluate. The search engine was finally implemented as a web-application within Novartis Pharma. The application is briefly described in the report. Conclusions We have presented the development of a search engine dedicated to patent search, based on state of the art methods applied to patent corpora. We have shown that a proper tuning of the system to adapt to the various search tasks clearly increases the effectiveness of the system. We conclude that different search tasks demand different information retrieval engines' settings in order to yield optimal end-user retrieval. PMID:24564220

  1. Design-Build-Write: Increasing the Impact of English for Specific Purposes Learning and Teaching in Aeronautical Engineering Education through Multiple Intelligences Task Design

    ERIC Educational Resources Information Center

    Tatzl, Dietmar

    2011-01-01

    This article presents an English for Specific Purposes (ESP) task developed for teaching aeronautical engineering students. The task Design-Build-Write rests on the assumption that engineering students are skilled at mathematical reasoning, problem solving, drawing and constructing. In Gardner's 1983 Multiple Intelligences (MI) theory, these…

  2. Using GOMS and Bayesian plan recognition to develop recognition models of operator behavior

    NASA Astrophysics Data System (ADS)

    Zaientz, Jack D.; DeKoven, Elyon; Piegdon, Nicholas; Wood, Scott D.; Huber, Marcus J.

    2006-05-01

    Trends in combat technology research point to an increasing role for uninhabited vehicles in modern warfare tactics. To support increased span of control over these vehicles human responsibilities need to be transformed from tedious, error-prone and cognition intensive operations into tasks that are more supervisory and manageable, even under intensely stressful conditions. The goal is to move away from only supporting human command of low-level system functions to intention-level human-system dialogue about the operator's tasks and situation. A critical element of this process is developing the means to identify when human operators need automated assistance and to identify what assistance they need. Toward this goal, we are developing an unmanned vehicle operator task recognition system that combines work in human behavior modeling and Bayesian plan recognition. Traditionally, human behavior models have been considered generative, meaning they describe all possible valid behaviors. Basing behavior recognition on models designed for behavior generation can offers advantages in improved model fidelity and reuse. It is not clear, however, how to reconcile the structural differences between behavior recognition and behavior modeling approaches. Our current work demonstrates that by pairing a cognitive psychology derived human behavior modeling approach, GOMS, with a Bayesian plan recognition engine, ASPRN, we can translate a behavior generation model into a recognition model. We will discuss the implications for using human performance models in this manner as well as suggest how this kind of modeling may be used to support the real-time control of multiple, uninhabited battlefield vehicles and other semi-autonomous systems.

  3. V/STOL propulsion control analysis: Phase 2, task 5-9

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Typical V/STOL propulsion control requirements were derived for transition between vertical and horizontal flight using the General Electric RALS (Remote Augmented Lift System) concept. Steady-state operating requirements were defined for a typical Vertical-to-Horizontal transition and for a typical Horizontal-to-Vertical transition. Control mode requirements were established and multi-variable regulators developed for individual operating conditions. Proportional/Integral gain schedules were developed and were incorporated into a transition controller with capabilities for mode switching and manipulated variable reassignment. A non-linear component-level transient model of the engine was developed and utilized to provide a preliminary check-out of the controller logic. An inlet and nozzle effects model was developed for subsequent incorporation into the engine model and an aircraft model was developed for preliminary flight transition simulations. A condition monitoring development plan was developed and preliminary design requirements established. The Phase 1 long-range technology plan was refined and restructured toward the development of a real-time high fidelity transient model of a supersonic V/STOL propulsion system and controller for use in a piloted simulation program at NASA-Ames.

  4. Human Factors Engineering. Part 2. HEDGE (Human Factors Engineering Data Guide for Evaluation)

    DTIC Science & Technology

    1983-11-30

    Use.Condit ions 0 7ý est Item ComoentsTask Categories EPurposes 2 ;c . INDEX TO THE INDEX MAN/ITEM TASK SHEET DETAILED DESIGN CONSIDERATION The purpose of...The use of these materials, in addition to standard Task and Design Checklists and Questionnaires, will enable you to tailor your FIFE subtest to a...specific Con item. The These materials have been prepared especially for you: I. They are intended to support test engineers not design engineers. 2

  5. Planning deficits in polysubstance dependent users: Differential associations with severity of drug use and intelligence.

    PubMed

    Valls-Serrano, C; Verdejo-García, A; Caracuel, A

    2016-05-01

    Polysubstance use is associated with alterations in different components of executive functioning such as working memory and response inhibition. Nevertheless, less attention has been given to executive planning skills, which are required to benefit of low structured interventions. This study examines the association between severity of use of cocaine, heroin, alcohol, fluid and crystallized intelligence and planning tasks varying on degree of structure. Data were collected from 60 polysubstance users and 30 healthy controls. Cognitive assessment consisted of three planning tasks with different structure levels: Stockings of Cambridge, Zoo Map test, and Multiple Errands Test. Polysubstance users had significant planning deficits across the three tasks compared to healthy controls. Hierarchical regression models showed that severity of drug use and fluid and crystallized intelligence significantly explained performance in all the planning tasks. However, these associations were higher for low-structured real world tasks. These low-structured tasks also showed a unique association with crystallized but not fluid intelligence. Drug abuse is negatively associated with planning abilities, and intelligence is positively associated with planning performance in real-world tasks. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.

  6. Development of Earthquake Emergency Response Plan for Tribhuvan International Airport, Kathmandu, Nepal

    DTIC Science & Technology

    2013-02-01

    Kathmandu, Nepal 5a. CONTRACT NUMBER W911NF-12-1-0282 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER ...In the past, big earthquakes in Nepal (see Figure 1.1) have caused a huge number of casualties and damage to structures. The Great Nepal -Bihar...UBC Earthquake Engineering Research Facility 2235 East Mall, Vancouver, BC, Canada V6T 1Z4 Phone : 604 822-6203 Fax: 604 822-6901 E-mail

  7. Critical care unit design: a nursing perspective.

    PubMed

    Williams, M

    2001-11-01

    The task of designing a new critical care unit is best accomplished with the input of people representing multiple disciplines including architects, engineers, physicians, nurses, and equipment manufacturers. It is imperative that the critical care nursing staff and management take an active role in planning the layout of the unit and patient rooms, as the nurses will be the bedside providers 24 hours a day. The new unit should be designed to offer efficient patient care as well as a healing, comfortable environment for both the patients and their families.

  8. Software engineering and data management for automated payload experiment tool

    NASA Technical Reports Server (NTRS)

    Maddux, Gary A.; Provancha, Anna; Chattam, David

    1994-01-01

    The Microgravity Projects Office identified a need to develop a software package that will lead experiment developers through the development planning process, obtain necessary information, establish an electronic data exchange avenue, and allow easier manipulation/reformatting of the collected information. An MS-DOS compatible software package called the Automated Payload Experiment Tool (APET) has been developed and delivered. The objective of this task is to expand on the results of the APET work previously performed by UAH and provide versions of the software in a Macintosh and Windows compatible format.

  9. Technology Insertion Engineering Services Masking Process Evaluation Task Order No. 7. (Phase 1). Revision B

    DTIC Science & Technology

    1989-10-06

    spent pumice cleaning. All parts can be pumice cleaned faster by using the method described in Quick Fix Plan paragraph 6.0. Soaking the scrubbed masked...times were run at an unusuall fast pace. For two other days workers were observed masking parts and by excluding the time spent talking and working on...stop-off Lacquer, MICCROSTOP REDUCER is recom. mended. Also, a shot soak in caustic cleaner, both at 212’ F., will break the adhesion and the coating is

  10. The production of the AGARD multilingual aeronautical dictionary using computer techniques

    NASA Technical Reports Server (NTRS)

    Wente, V. A.; Kirschbaum, J. C.; Kuney, J. H.

    1981-01-01

    The AGARD Multilingual Aeronautical Dictionary (MAD) contained 7,300 technical terms defined in English but also translated into nine other languages. The preparation work was performed by some 250 scientists and engineers who were members of AGARD and involved the translation skills of staff in many of the NATO nations. Nearly all the compilation and setting work for the book was done by computer and automatic photo-composition. The purpose of this publication is to record how the task was approached in terms of management planning.

  11. Technical Basis of Scaling Relationships for the Pretreatment Engineering Platform

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kuhn, William L.; Arm, Stuart T.; Huckaby, James L.

    Pacific Northwest National Laboratory has been tasked by Bechtel National Inc. (BNI) on the River Protection Project-Waste Treatment Plant (RPP-WTP) project to perform research and development activities. The Pretreatment Engineering Platform (PEP) is being designed and constructed as part of a plan to respond to an issue raised by the WTP External Flowsheet Review Team (EFRT) entitled “Undemonstrated Leaching Processes” and numbered M12. The PEP replicates the WTP leaching process using prototypic equipment and control strategies. The approach for scaling PEP performance data to predict WTP performance is critical to the successful resolution of the EFRT issue. This report describesmore » the recommended PEP scaling approach, PEP data interpretation and provides recommendations on test conduct and data requirements.« less

  12. Bench-Scale Filtration Testing in Support of the Pretreatment Engineering Platform (PEP)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Billing, Justin M.; Daniel, Richard C.; Kurath, Dean E.

    Pacific Northwest National Laboratory (PNNL) has been tasked by Bechtel National Inc. (BNI) on the River Protection Project-Hanford Tank Waste Treatment and Immobilization Plant (RPP-WTP) project to perform research and development activities to resolve technical issues identified for the Pretreatment Facility (PTF). The Pretreatment Engineering Platform (PEP) was designed, constructed and operated as part of a plan to respond to issue M12, “Undemonstrated Leaching Processes.” The PEP is a 1/4.5-scale test platform designed to simulate the WTP pretreatment caustic leaching, oxidative leaching, ultrafiltration solids concentration, and slurry washing processes. The PEP testing program specifies that bench-scale testing is to bemore » performed in support of specific operations, including filtration, caustic leaching, and oxidative leaching.« less

  13. Multi-AUV autonomous task planning based on the scroll time domain quantum bee colony optimization algorithm in uncertain environment

    PubMed Central

    Zhang, Rubo; Yang, Yu

    2017-01-01

    Research on distributed task planning model for multi-autonomous underwater vehicle (MAUV). A scroll time domain quantum artificial bee colony (STDQABC) optimization algorithm is proposed to solve the multi-AUV optimal task planning scheme. In the uncertain marine environment, the rolling time domain control technique is used to realize a numerical optimization in a narrowed time range. Rolling time domain control is one of the better task planning techniques, which can greatly reduce the computational workload and realize the tradeoff between AUV dynamics, environment and cost. Finally, a simulation experiment was performed to evaluate the distributed task planning performance of the scroll time domain quantum bee colony optimization algorithm. The simulation results demonstrate that the STDQABC algorithm converges faster than the QABC and ABC algorithms in terms of both iterations and running time. The STDQABC algorithm can effectively improve MAUV distributed tasking planning performance, complete the task goal and get the approximate optimal solution. PMID:29186166

  14. Multi-AUV autonomous task planning based on the scroll time domain quantum bee colony optimization algorithm in uncertain environment.

    PubMed

    Li, Jianjun; Zhang, Rubo; Yang, Yu

    2017-01-01

    Research on distributed task planning model for multi-autonomous underwater vehicle (MAUV). A scroll time domain quantum artificial bee colony (STDQABC) optimization algorithm is proposed to solve the multi-AUV optimal task planning scheme. In the uncertain marine environment, the rolling time domain control technique is used to realize a numerical optimization in a narrowed time range. Rolling time domain control is one of the better task planning techniques, which can greatly reduce the computational workload and realize the tradeoff between AUV dynamics, environment and cost. Finally, a simulation experiment was performed to evaluate the distributed task planning performance of the scroll time domain quantum bee colony optimization algorithm. The simulation results demonstrate that the STDQABC algorithm converges faster than the QABC and ABC algorithms in terms of both iterations and running time. The STDQABC algorithm can effectively improve MAUV distributed tasking planning performance, complete the task goal and get the approximate optimal solution.

  15. Evolutionary mechanics: new engineering principles for the emergence of flexibility in a dynamic and uncertain world.

    PubMed

    Whitacre, James M; Rohlfshagen, Philipp; Bender, Axel; Yao, Xin

    2012-09-01

    Engineered systems are designed to deftly operate under predetermined conditions yet are notoriously fragile when unexpected perturbations arise. In contrast, biological systems operate in a highly flexible manner; learn quickly adequate responses to novel conditions, and evolve new routines and traits to remain competitive under persistent environmental change. A recent theory on the origins of biological flexibility has proposed that degeneracy-the existence of multi-functional components with partially overlapping functions-is a primary determinant of the robustness and adaptability found in evolved systems. While degeneracy's contribution to biological flexibility is well documented, there has been little investigation of degeneracy design principles for achieving flexibility in systems engineering. Actually, the conditions that can lead to degeneracy are routinely eliminated in engineering design. With the planning of transportation vehicle fleets taken as a case study, this article reports evidence that degeneracy improves the robustness and adaptability of a simulated fleet towards unpredicted changes in task requirements without incurring costs to fleet efficiency. We find that degeneracy supports faster rates of design adaptation and ultimately leads to better fleet designs. In investigating the limitations of degeneracy as a design principle, we consider decision-making difficulties that arise from degeneracy's influence on fleet complexity. While global decision-making becomes more challenging, we also find degeneracy accommodates rapid distributed decision-making leading to (near-optimal) robust system performance. Given the range of conditions where favorable short-term and long-term performance outcomes are observed, we propose that degeneracy may fundamentally alter the propensity for adaptation and is useful within different engineering and planning contexts.

  16. A new multi-objective optimization model for preventive maintenance and replacement scheduling of multi-component systems

    NASA Astrophysics Data System (ADS)

    Moghaddam, Kamran S.; Usher, John S.

    2011-07-01

    In this article, a new multi-objective optimization model is developed to determine the optimal preventive maintenance and replacement schedules in a repairable and maintainable multi-component system. In this model, the planning horizon is divided into discrete and equally-sized periods in which three possible actions must be planned for each component, namely maintenance, replacement, or do nothing. The objective is to determine a plan of actions for each component in the system while minimizing the total cost and maximizing overall system reliability simultaneously over the planning horizon. Because of the complexity, combinatorial and highly nonlinear structure of the mathematical model, two metaheuristic solution methods, generational genetic algorithm, and a simulated annealing are applied to tackle the problem. The Pareto optimal solutions that provide good tradeoffs between the total cost and the overall reliability of the system can be obtained by the solution approach. Such a modeling approach should be useful for maintenance planners and engineers tasked with the problem of developing recommended maintenance plans for complex systems of components.

  17. Children's planning performance in the Zoo Map task (BADS-C): Is it driven by general cognitive ability, executive functioning, or prospection?

    PubMed

    Ballhausen, Nicola; Mahy, Caitlin E V; Hering, Alexandra; Voigt, Babett; Schnitzspahn, Katharina M; Lagner, Prune; Ihle, Andreas; Kliegel, Matthias

    2017-01-01

    A minimal amount of research has examined the cognitive predictors of children's performance in naturalistic, errand-type planning tasks such as the Zoo Map task of the Behavioral Assessment of the Dysexecutive Syndrome for Children (BADS-C). Thus, the current study examined prospection (i.e., the ability to remember to carry out a future intention), executive functioning, and intelligence markers as predictors of performance in this widely used naturalistic planning task in 56 children aged 7- to 12-years-old. Measures of planning, prospection, inhibition, crystallized intelligence, and fluid intelligence were collected in an individual differences study. Regression analyses showed that prospection (rather than traditional measures of intelligence or inhibition) predicted planning, suggesting that naturalistic planning tasks such as the Zoo Map task may rely on future-oriented cognitive processes rather than executive problem solving or general knowledge.

  18. Engineering neural systems for high-level problem solving.

    PubMed

    Sylvester, Jared; Reggia, James

    2016-07-01

    There is a long-standing, sometimes contentious debate in AI concerning the relative merits of a symbolic, top-down approach vs. a neural, bottom-up approach to engineering intelligent machine behaviors. While neurocomputational methods excel at lower-level cognitive tasks (incremental learning for pattern classification, low-level sensorimotor control, fault tolerance and processing of noisy data, etc.), they are largely non-competitive with top-down symbolic methods for tasks involving high-level cognitive problem solving (goal-directed reasoning, metacognition, planning, etc.). Here we take a step towards addressing this limitation by developing a purely neural framework named galis. Our goal in this work is to integrate top-down (non-symbolic) control of a neural network system with more traditional bottom-up neural computations. galis is based on attractor networks that can be "programmed" with temporal sequences of hand-crafted instructions that control problem solving by gating the activity retention of, communication between, and learning done by other neural networks. We demonstrate the effectiveness of this approach by showing that it can be applied successfully to solve sequential card matching problems, using both human performance and a top-down symbolic algorithm as experimental controls. Solving this kind of problem makes use of top-down attention control and the binding together of visual features in ways that are easy for symbolic AI systems but not for neural networks to achieve. Our model can not only be instructed on how to solve card matching problems successfully, but its performance also qualitatively (and sometimes quantitatively) matches the performance of both human subjects that we had perform the same task and the top-down symbolic algorithm that we used as an experimental control. We conclude that the core principles underlying the galis framework provide a promising approach to engineering purely neurocomputational systems for problem-solving tasks that in people require higher-level cognitive functions. Copyright © 2016 Elsevier Ltd. All rights reserved.

  19. Assessment Engineering Task Model Maps, Task Models and Templates as a New Way to Develop and Implement Test Specifications

    ERIC Educational Resources Information Center

    Luecht, Richard M.

    2013-01-01

    Assessment engineering is a new way to design and implement scalable, sustainable and ideally lower-cost solutions to the complexities of designing and developing tests. It represents a merger of sorts between cognitive task modeling and engineering design principles--a merger that requires some new thinking about the nature of score scales, item…

  20. The Differential Effects of Collaborative vs. Individual Prewriting Planning on Computer-Mediated L2 Writing: Transferability of Task-Based Linguistic Skills in Focus

    ERIC Educational Resources Information Center

    Amiryousefi, Mohammad

    2017-01-01

    The current study aimed at investigating the effects of three types of prewriting planning conditions, namely teacher-monitored collaborative planning (TMCP), student-led collaborative planning (SLCP), and individual planning (IP) on EFL learners' computer-mediated L2 written production and learning transfer from a pedagogic task to a new task of…

  1. [Effects of planning and executive functions on young children's script change strategy: A developmental perspective].

    PubMed

    Yanaoka, Kaichi

    2016-02-01

    This research examined the effects of planning and executive functions on young children's (ages 3-to 5-years) strategies in changing scripts. Young children (N = 77) performed a script task (doll task), three executive function tasks (DCCS, red/blue task, and nine box task), a planning task, and a receptive vocabulary task. In the doll task, young children first enacted a "changing clothes" script, and then faced a situation in which some elements of the script were inappropriate. They needed to enact a script by compensating inappropriate items for the other-script items or by changing to the other script in advance. The results showed that shifting, a factor of executive function, had a positive influence on whether young children could compensate inappropriate items. In addition, planning was also an important factor that helped children to change to the other script in advance. These findings suggest that shifting and planning play different roles in using the two strategies appropriately when young children enact scripts in unexpected situations.

  2. Impact of distributed virtual reality on engineering knowledge retention and student engagement

    NASA Astrophysics Data System (ADS)

    Sulbaran, Tulio Alberto

    Engineering Education is facing many problems, one of which is poor knowledge retention among engineering students. This problem affects the Architecture, Engineering, and Construction (A/E/C) industry, because students are unprepared for many necessary job skills. This problem of poor knowledge retention is caused by many factors, one of which is the mismatch between student learning preferences and the media used to teach engineering. The purpose of this research is to assess the impact of Distributed Virtual Reality (DVR) as an engineering teaching tool. The implementation of DVR addresses the issue of poor knowledge retention by impacting the mismatch between learning and teaching style in the visual versus verbal spectrum. Using as a point of departure three knowledge domain areas (Learning and Instruction, Distributed Virtual Reality and Crane Selection as Part of Crane Lift Planning), a DVR engineering teaching tool is developed, deployed and assessed in engineering classrooms. The statistical analysis of the data indicates that: (1) most engineering students are visual learners; (2) most students would like more classes using DVR; (3) engineering students find DVR more engaging than traditional learning methods; (4) most students find the responsiveness of the DVR environments to be either good or very good; (5) all students are able to interact with DVR and most of the students found it easy or very easy to navigate (without previous formal training in how to use DVR); (6) students' knowledge regarding the subject (crane selection) is higher after the experiment; and, (7) students' using different instructional media do not demonstrate statistical difference in knowledge retained after the experiment. This inter-disciplinary research offers opportunities for direct and immediate application in education, research, and industry, due to the fact that the instructional module developed (on crane selection as part of construction crane lift planning) can be used to convey knowledge to engineers beyond the classrooms. This instructional module can also be used as a workbench to assess parameters on engineering education such as time on task, assessment media, and long-term retention among others.

  3. L-Band System Engineering - Concepts of Use, Systems Performance Requirements, and Architecture

    NASA Technical Reports Server (NTRS)

    Henriksen, Stephen; Zelkin, Natalie

    2011-01-01

    This document is being provided as part of ITT s NASA Glenn Research Center Aerospace Communication Systems Technical Support (ACSTS) contract NNC05CA85C, Task 7: New ATM Requirements-Future Communications, C-band and L-band Communications Standard Development. Task 7 was motivated by the five year technology assessment performed for the Federal Aviation Administration (FAA) under the joint FAA-EUROCONTROL cooperative research Action Plan (AP-17), also known as the Future Communications Study (FCS). It was based on direction provided by the FAA project-level agreement (PLA FY09_G1M.02-02v1) for "New ATM Requirements-Future Communications." Task 7 was separated into two distinct subtasks, each aligned with specific work elements and deliverable items. Subtask 7-1 addressed C-band airport surface data communications standards development, systems engineering, test bed development, and tests/demonstrations to establish operational capability for what is now referred to as the Aeronautical Mobile Airport Communications System (AeroMACS). Subtask 7-2, which is the subject of this report, focused on preliminary systems engineering and support of joint FAA/EUROCONTROL development and evaluation of a future L-band (960 to 1164 MHz) air/ground (A/G) communication system known as the L-band digital aeronautical communications system (L-DACS), which was defined during the FCS. The proposed L-DACS will be capable of providing ATM services in continental airspace in the 2020+ timeframe. Subtask 7-2 was performed in two phases. Phase I featured development of Concepts of Use, high level functional analyses, performance of initial L-band system safety and security risk assessments, and development of high level requirements and architectures. It also included the aforementioned support of joint L-DACS development and evaluation, including inputs to L-DACS design specifications. Phase II provided a refinement of the systems engineering activities performed during Phase I, along with continued joint FAA/EUROCONTROL L-DACS development and evaluation support.

  4. The Effects of Pre-Task, On-Line, and Both Pre-Task and On-Line Planning on Fluency, Complexity, and Accuracy--The Case of Iranian EFL Learners' Written Production

    ERIC Educational Resources Information Center

    Piri, Faramarz; Barati, Hossein; Ketabi, Saeed

    2012-01-01

    Previous studies on the effect of planning on language production have revealed that planning does have a positive effect on language performance in terms of fluency, complexity, and accuracy. The present study was an attempt to investigate the effects of pre-task, on-line, and both pre-task and on-line planning on fluency, accuracy, and…

  5. How to Develop an Engineering Design Task

    ERIC Educational Resources Information Center

    Dankenbring, Chelsey; Capobianco, Brenda M.; Eichinger, David

    2014-01-01

    In this article, the authors provide an overview of engineering and the engineering design process, and describe the steps they took to develop a fifth grade-level, standards-based engineering design task titled "Getting the Dirt on Decomposition." Their main goal was to focus more on modeling the discrete steps they took to create and…

  6. The K-8 Aeronautics Internet Testbook: Project Plan-Year 3

    NASA Technical Reports Server (NTRS)

    Pallis, Jani Macari

    1997-01-01

    The Project Plan - Year 3 includes: the major tasks and milestones, the assignment of tasks, and the key personnel assigned to each task, a description of the milestone and major task, and the deliverables for the project. Milestones have project numbers ending in "0.0", such as "25.0.0 Phase III Development". Major tasks under that milestone begin with the same first number such as, "25.0.1 Develop Future Of Aeronautics". The assignment of tasks included in the Year 3 project plan contains the names of the key personnel responsible for the task and others participating on the task. Although the PI has the overall and ultimately responsible for all the tasks and milestones, the name of the first individual on a task or milestone is the person responsible for that task. Other names listed under that task will be participating on the task. Since there are two individuals at Cislunar Aerospace, Inc. with the name "J. Pallis", the principal investigator, Jani Macari Pallis is designated as PI in the Project Plan and James Pallis is designated as J. Pallis.

  7. Real Time Optima Tracking Using Harvesting Models of the Genetic Algorithm

    NASA Technical Reports Server (NTRS)

    Baskaran, Subbiah; Noever, D.

    1999-01-01

    Tracking optima in real time propulsion control, particularly for non-stationary optimization problems is a challenging task. Several approaches have been put forward for such a study including the numerical method called the genetic algorithm. In brief, this approach is built upon Darwinian-style competition between numerical alternatives displayed in the form of binary strings, or by analogy to 'pseudogenes'. Breeding of improved solution is an often cited parallel to natural selection in.evolutionary or soft computing. In this report we present our results of applying a novel model of a genetic algorithm for tracking optima in propulsion engineering and in real time control. We specialize the algorithm to mission profiling and planning optimizations, both to select reduced propulsion needs through trajectory planning and to explore time or fuel conservation strategies.

  8. Modeling and analysis of power processing systems: Feasibility investigation and formulation of a methodology

    NASA Technical Reports Server (NTRS)

    Biess, J. J.; Yu, Y.; Middlebrook, R. D.; Schoenfeld, A. D.

    1974-01-01

    A review is given of future power processing systems planned for the next 20 years, and the state-of-the-art of power processing design modeling and analysis techniques used to optimize power processing systems. A methodology of modeling and analysis of power processing equipment and systems has been formulated to fulfill future tradeoff studies and optimization requirements. Computer techniques were applied to simulate power processor performance and to optimize the design of power processing equipment. A program plan to systematically develop and apply the tools for power processing systems modeling and analysis is presented so that meaningful results can be obtained each year to aid the power processing system engineer and power processing equipment circuit designers in their conceptual and detail design and analysis tasks.

  9. Validating the Electric Maze Task as a Measure of Planning

    ERIC Educational Resources Information Center

    Sheppard, Kelly W.; Cheatham, Carol L.

    2017-01-01

    The Electric Maze Task (EMT) is a novel planning task designed to allow flexible testing of planning abilities across a broad age range and to incorporate manipulations to test underlying planning abilities, such as working-memory and inhibitory control skills. The EMT was tested in a group of 63 typically developing 7- to 12-year-olds.…

  10. Planning and Enacting Mathematical Tasks of High Cognitive Demand in the Primary Classroom

    ERIC Educational Resources Information Center

    Georgius, Kelly

    2013-01-01

    This study offers an examination of two primary-grades teachers as they learn to transfer knowledge from professional development into their classrooms. I engaged in planning sessions with each teacher to help plan tasks of high cognitive demand, including anticipating and planning for classroom discourse that would occur around the task. A…

  11. Designing Preclinical Instruction for Psychomotor Skills (II)--Instructional Engineering: Task Analysis.

    ERIC Educational Resources Information Center

    Knight, G. William; And Others

    1994-01-01

    The first step in engineering the instruction of dental psychomotor skills, task analysis, is explained. A chart details the procedural, cognitive, desired-criteria, and desired-performance analysis of a single task, occlusal preparation for amalgam restoration with carious lesion. (MSE)

  12. Design Of An Intelligent Robotic System Organizer Via Expert System Tecniques

    NASA Astrophysics Data System (ADS)

    Yuan, Peter H.; Valavanis, Kimon P.

    1989-02-01

    Intelligent Robotic Systems are a special type of Intelligent Machines. When modeled based on Vle theory of Intelligent Controls, they are composed of three interactive levels, namely: organization, coordination, and execution, ordered according, to the ,Principle of Increasing, Intelligence with Decreasing Precl.sion. Expert System techniques, are used to design an Intelligent Robotic System Organizer with a dynamic Knowledge Base and an interactive Inference Engine. Task plans are formulated using, either or both of a Probabilistic Approach and Forward Chapling Methodology, depending on pertinent information associated with a spec;fic requested job. The Intelligent Robotic System, Organizer is implemented and tested on a prototype system operating in an uncertain environment. An evaluation of-the performance, of the prototype system is conducted based upon the probability of generating a successful task sequence versus the number of trials taken by the organizer.

  13. Using SysML for verification and validation planning on the Large Synoptic Survey Telescope (LSST)

    NASA Astrophysics Data System (ADS)

    Selvy, Brian M.; Claver, Charles; Angeli, George

    2014-08-01

    This paper provides an overview of the tool, language, and methodology used for Verification and Validation Planning on the Large Synoptic Survey Telescope (LSST) Project. LSST has implemented a Model Based Systems Engineering (MBSE) approach as a means of defining all systems engineering planning and definition activities that have historically been captured in paper documents. Specifically, LSST has adopted the Systems Modeling Language (SysML) standard and is utilizing a software tool called Enterprise Architect, developed by Sparx Systems. Much of the historical use of SysML has focused on the early phases of the project life cycle. Our approach is to extend the advantages of MBSE into later stages of the construction project. This paper details the methodology employed to use the tool to document the verification planning phases, including the extension of the language to accommodate the project's needs. The process includes defining the Verification Plan for each requirement, which in turn consists of a Verification Requirement, Success Criteria, Verification Method(s), Verification Level, and Verification Owner. Each Verification Method for each Requirement is defined as a Verification Activity and mapped into Verification Events, which are collections of activities that can be executed concurrently in an efficient and complementary way. Verification Event dependency and sequences are modeled using Activity Diagrams. The methodology employed also ties in to the Project Management Control System (PMCS), which utilizes Primavera P6 software, mapping each Verification Activity as a step in a planned activity. This approach leads to full traceability from initial Requirement to scheduled, costed, and resource loaded PMCS task-based activities, ensuring all requirements will be verified.

  14. Nuclear Engineering Technologists in the Nuclear Power Era

    ERIC Educational Resources Information Center

    Wang, C. H.; And Others

    1974-01-01

    Describes manpower needs in nuclear engineering in the areas of research and development, architectural engineering and construction supervision, power reactor operations, and regulatory tasks. Outlines a suitable curriculum to prepare students for the tasks related to construction and operation of power reactors. (GS)

  15. How system designers think: a study of design thinking in human factors engineering.

    PubMed

    Papantonopoulos, Sotiris

    2004-11-01

    The paper presents a descriptive study of design thinking in human factors engineering. The objective of the study is to analyse the role of interpretation in design thinking and the role of design practice in guiding interpretation. The study involved 10 system designers undertaking the allocation of cognitive functions in three production planning and control task scenarios. Allocation decisions were recorded and verbal protocols of the design process were collected to elicit the subjects' thought processes. Verbal protocol analysis showed that subjects carried out the design of cognitive task allocation as a problem of applying a selected automation technology from their initial design deliberations. This design strategy stands in contrast to the predominant view of system design that stipulates that user requirements should be thoroughly analysed prior to making any decisions about technology. Theoretical frameworks from design research and ontological design showed that the system design process may be better understood by recognizing the role of design hypotheses in system design, as well as the diverse interactions between interpretation and practice, means and ends, and design practice and the designer's pre-understanding which shape the design process. Ways to balance the bias exerted on the design process were discussed.

  16. The Role of Oral Communicative Tasks (OCT) in Developing the Spoken Proficiency of Engineering Students

    ERIC Educational Resources Information Center

    Shantha, S.; Mekala, S.

    2017-01-01

    The mastery of speaking skills in English has become a major requisite in engineering industry. Engineers are expected to possess speaking skills for executing their routine activities and career prospects. The article focuses on the experimental study conducted to improve English spoken proficiency of Indian engineering students using task-based…

  17. Investigating the Effects of Planning on L2 Text Chat Performance

    ERIC Educational Resources Information Center

    Hsu, Hsiu-Chen

    2012-01-01

    Over the last decade, a small body of SLA research has examined the effects of task planning on L2 production. This research has revealed positive results concerning the effect of pre-task and online planning on oral and written production. However, no studies to date have investigated the joint effects of pre-task and online planning. In…

  18. Continuous improvement of the quality reporting system of a medium-size company

    NASA Astrophysics Data System (ADS)

    Hawkins, Anthony; Onuh, Spencer

    2001-10-01

    Many companies are faced with quality improvement issues on a daily basis but their response to this problem varies. This paper discusses the improvement in the defect reporting system at a medium sized manufacturing company following the appointment of an experienced, motivated, design engineer to be dedicated to that task. It sets out the situation that the engineer inherited and details the changes that were incorporated; it assesses which were successful and which failed. Following a survey of current literature, it was seen that there is little written specifically on the subject of audited defect reporting. It is felt that this study goes some way to filling that void. A successful survey of engineering companies in Southern Hampshire reinforces the principle findings, that the emphasising of the Check part of Demming's Plan-Do-Check-Act cycle is a novel approach to the Quality Improvement Process, and that it has reduced the cost of rework by an audited 80% in a period of two years.

  19. Goal striving strategies and effort mobilization: When implementation intentions reduce effort-related cardiac activity during task performance.

    PubMed

    Freydefont, Laure; Gollwitzer, Peter M; Oettingen, Gabriele

    2016-09-01

    Two experiments investigate the influence of goal and implementation intentions on effort mobilization during task performance. Although numerous studies have demonstrated the beneficial effects of setting goals and making plans on performance, the effects of goals and plans on effort-related cardiac activity and especially the cardiac preejection period (PEP) during goal striving have not yet been addressed. According to the Motivational Intensity Theory, participants should increase effort mobilization proportionally to task difficulty as long as success is possible and justified. Forming goals and making plans should allow for reduced effort mobilization when participants perform an easy task. However, when the task is difficult, goals and plans should differ in their effect on effort mobilization. Participants who set goals should disengage, whereas participants who made if-then plans should stay in the field showing high effort mobilization during task performance. As expected, using an easy task in Experiment 1, we observed a lower cardiac PEP in both the implementation intention and the goal intention condition than in the control condition. In Experiment 2, we varied task difficulty and demonstrated that while participants with a mere goal intention disengaged from difficult tasks, participants with an implementation intention increased effort mobilization proportionally with task difficulty. These findings demonstrate the influence of goal striving strategies (i.e., mere goals vs. if-then plans) on effort mobilization during task performance. Copyright © 2016 Elsevier B.V. All rights reserved.

  20. Pacific Northwest National Laboratory institutional plan FY 1997--2002

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-10-01

    Pacific Northwest National Laboratory`s core mission is to deliver environmental science and technology in the service of the nation and humanity. Through basic research fundamental knowledge is created of natural, engineered, and social systems that is the basis for both effective environmental technology and sound public policy. Legacy environmental problems are solved by delivering technologies that remedy existing environmental hazards, today`s environmental needs are addressed with technologies that prevent pollution and minimize waste, and the technical foundation is being laid for tomorrow`s inherently clean energy and industrial processes. Pacific Northwest National Laboratory also applies its capabilities to meet selected nationalmore » security, energy, and human health needs; strengthen the US economy; and support the education of future scientists and engineers. Brief summaries are given of the various tasks being carried out under these broad categories.« less

  1. The Effects of Guided vs. Unguided Pressured Planning on EFL Learners' Writing Fluency

    ERIC Educational Resources Information Center

    Mohammadnia, Zhila; Ayaz, Parisa

    2015-01-01

    Task-based planning can be conceptualized as the opportunity to work out task performance before the actual performance. It allows learners to process the content and language of their planned production at a deeper and more meaningful level. In the face of the wide range of research conducted on the effects of pre-task planning on L2 production,…

  2. Field test designs for the evaluation of vessel operators' use of and confidence in various aids to navigation

    DOT National Transportation Integrated Search

    1995-12-01

    Development Center in evaluating current Coast Guard policies and development plans for : Waterways Management, a "Waterways Management Research and Planning" task plan was : established as Task Area A in FY '94. The purpose of this task area is to d...

  3. Comparative analysis of operational forecasts versus actual weather conditions in airline flight planning: Summary report

    NASA Technical Reports Server (NTRS)

    Keitz, J. F.

    1982-01-01

    The impact of more timely and accurate weather data on airline flight planning with the emphasis on fuel savings is studied. This summary report discusses the results of each of the four major tasks of the study. Task 1 compared airline flight plans based on operational forecasts to plans based on the verifying analyses and found that average fuel savings of 1.2 to 2.5 percent are possible with improved forecasts. Task 2 consisted of similar comparisons but used a model developed for the FAA by SRI International that simulated the impact of ATc diversions on the flight plans. While parts of Task 2 confirm the Task I findings, inconsistency with other data and the known impact of ATC suggests that other Task 2 findings are the result of errors in the model. Task 3 compares segment weather data from operational flight plans with the weather actually observed by the aircraft and finds the average error could result in fuel burn penalties (or savings) of up to 3.6 percent for the average 8747 flight. In Task 4 an in-depth analysis of the weather forecast for the 33 days included in the study finds that significant errors exist on 15 days. Wind speeds in the area of maximum winds are underestimated by 20 to 50 kts., a finding confirmed in the other three tasks.

  4. Effects of Task Planning and Rhetorical Mode of Writing on Lexical Complexity, Syntactic Complexity, and Overall Writing Quality of EFL Writers' Task Performance

    ERIC Educational Resources Information Center

    Yildiz, Mine; Yesilyurt, Savas

    2017-01-01

    Based on Robinson's Triadic Componential Framework and the definition of task planning by Ellis (2005), this study was carried out to find out the effects of task planning and rhetorical mode on lexical and syntactic complexity, and overall writing quality of writing production of EFL learners. Following a repeated-measures design, the present…

  5. Asymptotically Optimal Motion Planning for Learned Tasks Using Time-Dependent Cost Maps

    PubMed Central

    Bowen, Chris; Ye, Gu; Alterovitz, Ron

    2015-01-01

    In unstructured environments in people’s homes and workspaces, robots executing a task may need to avoid obstacles while satisfying task motion constraints, e.g., keeping a plate of food level to avoid spills or properly orienting a finger to push a button. We introduce a sampling-based method for computing motion plans that are collision-free and minimize a cost metric that encodes task motion constraints. Our time-dependent cost metric, learned from a set of demonstrations, encodes features of a task’s motion that are consistent across the demonstrations and, hence, are likely required to successfully execute the task. Our sampling-based motion planner uses the learned cost metric to compute plans that simultaneously avoid obstacles and satisfy task constraints. The motion planner is asymptotically optimal and minimizes the Mahalanobis distance between the planned trajectory and the distribution of demonstrations in a feature space parameterized by the locations of task-relevant objects. The motion planner also leverages the distribution of the demonstrations to significantly reduce plan computation time. We demonstrate the method’s effectiveness and speed using a small humanoid robot performing tasks requiring both obstacle avoidance and satisfaction of learned task constraints. Note to Practitioners Motivated by the desire to enable robots to autonomously operate in cluttered home and workplace environments, this paper presents an approach for intuitively training a robot in a manner that enables it to repeat the task in novel scenarios and in the presence of unforeseen obstacles in the environment. Based on user-provided demonstrations of the task, our method learns features of the task that are consistent across the demonstrations and that we expect should be repeated by the robot when performing the task. We next present an efficient algorithm for planning robot motions to perform the task based on the learned features while avoiding obstacles. We demonstrate the effectiveness of our motion planner for scenarios requiring transferring a powder and pushing a button in environments with obstacles, and we plan to extend our results to more complex tasks in the future. PMID:26279642

  6. ARC-2001-ACD01-0018

    NASA Image and Video Library

    2001-02-16

    New Center Network Deployment ribbon Cutting: from left to right: Maryland Edwards, Code JT upgrade project deputy task manager; Ed Murphy, foundry networks systems engineer; Bohdan Cmaylo, Code JT upgrade project task manager, Scott Santiago, Division Chief, Code JT; Greg Miller, Raytheon Network engineer and Frank Daras, Raytheon network engineering manager.

  7. Integrated System for Autonomous Science

    NASA Technical Reports Server (NTRS)

    Chien, Steve; Sherwood, Robert; Tran, Daniel; Cichy, Benjamin; Davies, Ashley; Castano, Rebecca; Rabideau, Gregg; Frye, Stuart; Trout, Bruce; Shulman, Seth; hide

    2006-01-01

    The New Millennium Program Space Technology 6 Project Autonomous Sciencecraft software implements an integrated system for autonomous planning and execution of scientific, engineering, and spacecraft-coordination actions. A prior version of this software was reported in "The TechSat 21 Autonomous Sciencecraft Experiment" (NPO-30784), NASA Tech Briefs, Vol. 28, No. 3 (March 2004), page 33. This software is now in continuous use aboard the Earth Orbiter 1 (EO-1) spacecraft mission and is being adapted for use in the Mars Odyssey and Mars Exploration Rovers missions. This software enables EO-1 to detect and respond to such events of scientific interest as volcanic activity, flooding, and freezing and thawing of water. It uses classification algorithms to analyze imagery onboard to detect changes, including events of scientific interest. Detection of such events triggers acquisition of follow-up imagery. The mission-planning component of the software develops a response plan that accounts for visibility of targets and operational constraints. The plan is then executed under control by a task-execution component of the software that is capable of responding to anomalies.

  8. Make Your Workflows Smarter

    NASA Technical Reports Server (NTRS)

    Jones, Corey; Kapatos, Dennis; Skradski, Cory

    2012-01-01

    Do you have workflows with many manual tasks that slow down your business? Or, do you scale back workflows because there are simply too many manual tasks? Basic workflow robots can automate some common tasks, but not everything. This presentation will show how advanced robots called "expression robots" can be set up to perform everything from simple tasks such as: moving, creating folders, renaming, changing or creating an attribute, and revising, to more complex tasks like: creating a pdf, or even launching a session of Creo Parametric and performing a specific modeling task. Expression robots are able to utilize the Java API and Info*Engine to do almost anything you can imagine! Best of all, these tools are supported by PTC and will work with later releases of Windchill. Limited knowledge of Java, Info*Engine, and XML are required. The attendee will learn what task expression robots are capable of performing. The attendee will learn what is involved in setting up an expression robot. The attendee will gain a basic understanding of simple Info*Engine tasks

  9. 46 CFR 107.305 - Plans and information.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... systems. Marine Engineering (z) Plans required for marine engineering equipment and systems by Subchapter F of this chapter. Electrical Engineering (aa) Plans required for electrical engineering equipment... materials that do not conform to ABS or ASTM specifications, complete specifications, including chemical and...

  10. Task planning with uncertainty for robotic systems. Thesis

    NASA Technical Reports Server (NTRS)

    Cao, Tiehua

    1993-01-01

    In a practical robotic system, it is important to represent and plan sequences of operations and to be able to choose an efficient sequence from them for a specific task. During the generation and execution of task plans, different kinds of uncertainty may occur and erroneous states need to be handled to ensure the efficiency and reliability of the system. An approach to task representation, planning, and error recovery for robotic systems is demonstrated. Our approach to task planning is based on an AND/OR net representation, which is then mapped to a Petri net representation of all feasible geometric states and associated feasibility criteria for net transitions. Task decomposition of robotic assembly plans based on this representation is performed on the Petri net for robotic assembly tasks, and the inheritance of properties of liveness, safeness, and reversibility at all levels of decomposition are explored. This approach provides a framework for robust execution of tasks through the properties of traceability and viability. Uncertainty in robotic systems are modeled by local fuzzy variables, fuzzy marking variables, and global fuzzy variables which are incorporated in fuzzy Petri nets. Analysis of properties and reasoning about uncertainty are investigated using fuzzy reasoning structures built into the net. Two applications of fuzzy Petri nets, robot task sequence planning and sensor-based error recovery, are explored. In the first application, the search space for feasible and complete task sequences with correct precedence relationships is reduced via the use of global fuzzy variables in reasoning about subgoals. In the second application, sensory verification operations are modeled by mutually exclusive transitions to reason about local and global fuzzy variables on-line and automatically select a retry or an alternative error recovery sequence when errors occur. Task sequencing and task execution with error recovery capability for one and multiple soft components in robotic systems are investigated.

  11. Slush Hydrogen (SLH2) technology development for application to the National Aerospace Plane (NASP)

    NASA Technical Reports Server (NTRS)

    Dewitt, Richard L.; Hardy, Terry L.; Whalen, Margaret V.; Richter, G. Paul

    1989-01-01

    The National Aerospace Plane (NASP) program is giving us the opportunity to reach new unique answers in a number of engineering categories. The answers are considered enhancing technology or enabling technology. Airframe materials and densified propellants are examples of enabling technology. The National Aeronautics and Space Administration's Lewis Research Center has the task of providing the technology data which will be used as the basis to decide if slush hydrogen (SLH2) will be the fuel of choice for the NASP. The objectives of this NASA Lewis program are: (1) to provide, where possible, verified numerical models of fluid production, storage, transfer, and feed systems, and (2) to provide verified design criteria for other engineered aspects of SLH2 systems germane to a NASP. This program is a multiyear multimillion dollar effort. The present pursuit of the above listed objectives is multidimensional, covers a range of problem areas, works these to different levels of depth, and takes advantage of the resources available in private industry, academia, and the U.S. Government. The NASA Lewis overall program plan is summarized. The initial implementation of the plan will be unfolded and the present level of efforts in each of the resource areas will be discussed. Results already in hand will be pointed out. A description of additionally planned near-term experimental and analytical work is described.

  12. Applications of artificial intelligence to mission planning

    NASA Technical Reports Server (NTRS)

    Ford, Donnie R.; Rogers, John S.; Floyd, Stephen A.

    1990-01-01

    The scheduling problem facing NASA-Marshall mission planning is extremely difficult for several reasons. The most critical factor is the computational complexity involved in developing a schedule. The size of the search space is large along some dimensions and infinite along others. It is because of this and other difficulties that many of the conventional operation research techniques are not feasible or inadequate to solve the problems by themselves. Therefore, the purpose is to examine various artificial intelligence (AI) techniques to assist conventional techniques or to replace them. The specific tasks performed were as follows: (1) to identify mission planning applications for object oriented and rule based programming; (2) to investigate interfacing AI dedicated hardware (Lisp machines) to VAX hardware; (3) to demonstrate how Lisp may be called from within FORTRAN programs; (4) to investigate and report on programming techniques used in some commercial AI shells, such as Knowledge Engineering Environment (KEE); and (5) to study and report on algorithmic methods to reduce complexity as related to AI techniques.

  13. GSFC Information Systems Technology Developments Supporting the Vision for Space Exploration

    NASA Technical Reports Server (NTRS)

    Hughes, Peter; Dennehy, Cornelius; Mosier, Gary; Smith, Dan; Rykowski, Lisa

    2004-01-01

    The Vision for Space Exploration will guide NASA's future human and robotic space activities. The broad range of human and robotic missions now being planned will require the development of new system-level capabilities enabled by emerging new technologies. Goddard Space Flight Center is actively supporting the Vision for Space Exploration in a number of program management, engineering and technology areas. This paper provides a brief background on the Vision for Space Exploration and a general overview of potential key Goddard contributions. In particular, this paper focuses on describing relevant GSFC information systems capabilities in architecture development; interoperable command, control and communications; and other applied information systems technology/research activities that are applicable to support the Vision for Space Exploration goals. Current GSFC development efforts and task activities are presented together with future plans.

  14. Engineering studies related to the Skylab program. Task H: Microwave/optical/infrared image processing for ocean current recognition. [from radar altimeter data

    NASA Technical Reports Server (NTRS)

    Smith, A. G.

    1974-01-01

    Images from the Skylab S-193 radar altimeter were selected from data obtained on appropriate passes made by Skylabs 2, 3, and 4 missions for the following three objectives: (1) to serve as a precursor to an investigation for the planned GEOS-C mission, in which radar altimeter data will be analyzed to reveal ocean current related to surface topography; (2) to determine the value of satellite infrared and visual radiometer data as potential sources of ground truth data, the results of which be incorporated in the planning of the SEASAT program; and (3) to determine whether optimal data reduction techniques are useful for revealing clues on Gulf Stream topographic signature characteristics. The results obtained which apply to the stated objectives are discussed.

  15. Critical Materials Needs

    DTIC Science & Technology

    1975-05-01

    Waste-to-energy systems Recycling of materials from refuse Desulfurization of flue gases from electric power plants Sattelle Specialists...High-Temperature Gas -Turbine Engines for Automotive Applications Initiation of Task II and Task III (Task II: Description of Technologies and...3 - • Mining and Minerals Processing • Ocean Engineering • Transportation • Waste Treatment and Environmental Control The technologies

  16. Collaborative Russian-US work in nuclear material protection, control and accounting at the Institute of Physics and Power Engineering. 2: Extension to additional facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kuzin, V.V.; Pshakin, G.M.; Belov, A.P.

    1996-12-31

    During 1995, collaborative Russian-US nuclear material protection, control, and accounting (MPC and A) tasks at the Institute of Physics and Power Engineering (IPPE) in Obninsk, Russia focused on improving the protection of nuclear materials at the BFS Fast Critical Facility. BFS has tens of thousands of fuel disks containing highly enriched uranium and weapons-grade plutonium that are used to simulate the core configurations of experimental reactors in two critical assemblies. Completed tasks culminated in demonstrations of newly implemented equipment (Russian and US) and methods that enhanced the MPC and A at BFS through computerized accounting, nondestructive inventory verification measurements, personnelmore » identification and access control, physical inventory taking, physical protection, and video surveillance. The collaborative work with US Department of Energy national laboratories is now being extended. In 1996 additional tasks to improve MPC and A have been implemented at BFS, the Technological Laboratory for Fuel Fabrication (TLFF) the Central Storage Facility (CSF), and for the entire site. The TLFF reclads BFS uranium metal fuel disks (process operations and transfers of fissile material). The CSF contains many different types of nuclear material. MPC and A at these additional facilities will be integrated with that at BFS as a prototype site-wide approach. Additional site-wide tasks encompass communications and tamper-indicating devices. Finally, new storage alternatives are being implemented that will consolidate the more attractive nuclear materials in a better-protected nuclear island. The work this year represents not just the addition of new facilities and the site-wide approach, but the systematization of the MPC and A elements that are being implemented as a first step and the more comprehensive ones planned.« less

  17. Development of OTM Syngas Process and Testing of Syngas Derived Ultra-clean Fuels in Diesel Engines and Fuel Cells

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    E.T.; James P. Meagher; Prasad Apte

    2002-12-31

    This topical report summarizes work accomplished for the Program from November 1, 2001 to December 31, 2002 in the following task areas: Task 1: Materials Development; Task 2: Composite Development; Task 4: Reactor Design and Process Optimization; Task 8: Fuels and Engine Testing; 8.1 International Diesel Engine Program; 8.2 Nuvera Fuel Cell Program; and Task 10: Program Management. Major progress has been made towards developing high temperature, high performance, robust, oxygen transport elements. In addition, a novel reactor design has been proposed that co-produces hydrogen, lowers cost and improves system operability. Fuel and engine testing is progressing well, but wasmore » delayed somewhat due to the hiatus in program funding in 2002. The Nuvera fuel cell portion of the program was completed on schedule and delivered promising results regarding low emission fuels for transportation fuel cells. The evaluation of ultra-clean diesel fuels continues in single cylinder (SCTE) and multiple cylinder (MCTE) test rigs at International Truck and Engine. FT diesel and a BP oxygenate showed significant emissions reductions in comparison to baseline petroleum diesel fuels. Overall through the end of 2002 the program remains under budget, but behind schedule in some areas.« less

  18. Low-cost solar array progress and plans

    NASA Astrophysics Data System (ADS)

    Callaghan, W. T.

    It is pointed out that significant redirection has occurred in the U.S. Department of Energy (DOE) Photovoltaics Program, and thus in the Flat-Plate Solar Array Project (FSA), since the 3rd European Communities Conference. The Silicon Materials Task has now the objective to sponsor theoretical and experimental research on silicon material refinement technology suitable for photovoltaic flat-plate solar arrays. With respect to the hydrochlorination reaction, a process proof of concept was completed through definition of reaction kinetics, catalyst, and reaction characteristics. In connection with the dichlorosilane chemical vapor desposition process, a preliminary design was completed of an experimental process system development unit with a capacity of 100 to 200 MT/yr of Si.Attention is also given to the silicon-sheet formation research area, environmental isolation research, the cell and module formation task, the engineering sciences area, and the module performance and failure analysis area.

  19. Efficient Symbolic Task Planning for Multiple Mobile Robots

    DTIC Science & Technology

    2016-12-13

    Efficient Symbolic Task Planning for Multiple Mobile Robots Yuqian Jiang December 13, 2016 Abstract Symbolic task planning enables a robot to make...high-level deci- sions toward a complex goal by computing a sequence of actions with minimum expected costs. This thesis builds on a single- robot ...time complexity of optimal planning for multiple mobile robots . In this thesis we first investigate the performance of the state-of-the-art solvers of

  20. Configuration evaluation and criteria plan. Volume 1: System trades study and design methodology plan (preliminary). Space Transportation Main Engine (STME) configuration study

    NASA Technical Reports Server (NTRS)

    Bair, E. K.

    1986-01-01

    The System Trades Study and Design Methodology Plan is used to conduct trade studies to define the combination of Space Shuttle Main Engine features that will optimize candidate engine configurations. This is accomplished by using vehicle sensitivities and engine parametric data to establish engine chamber pressure and area ratio design points for candidate engine configurations. Engineering analyses are to be conducted to refine and optimize the candidate configurations at their design points. The optimized engine data and characteristics are then evaluated and compared against other candidates being considered. The Evaluation Criteria Plan is then used to compare and rank the optimized engine configurations on the basis of cost.

  1. Engineering America's Future in Space: Systems Engineering Innovations for Sustainable Exploration

    NASA Technical Reports Server (NTRS)

    Dumbacher, Daniel L.; Jones, Carl P.

    2008-01-01

    The National Aeronautics and Space Administration (NASA) delivers space transportation solutions for America's complex missions, ranging from scientific payloads that expand knowledge, such as the Hubble Space Telescope, to astronauts and lunar rovers destined for voyages to the Moon. Currently, the venerable Space Shuttle, which has been in service since 1981, provides U.S. capability for both crew and cargo to low-Earth orbit to construct the International Space Station, before the Shuttle is retired in 2010, as outlined in the 2006 NASA Strategic Plan. I In the next decade, NASA will replace this system with a duo of launch vehicles: the Ares I Crew Launch Vehicle/Orion Crew Exploration Vehicle and the Ares V Cargo Launch Vehicle/Altair Lunar Lander. The goals for this new system include increased safety and reliability, coupled with lower operations costs that promote sustainable space exploration over a multi-decade schedule. This paper will provide details of the in-house systems engineering and vehicle integration work now being performed for the Ares I and planned for the Ares V. It will give an overview of the Ares I system-level test activities, such as the ground vibration testing that will be conducted in the Marshall Center's Dynamic Test Stand to verify the integrated vehicle stack's structural integrity against predictions made by modern modeling and simulation analysis. It also will give information about the work in progress for the Ares I-X developmental test flight planned in 2009 to provide key data before the Ares I Critical Design Review. Activities such as these will help prove and refine mission concepts of operation, while supporting the spectrum of design and development tasks being performed by Marshall's Engineering Directorate, ranging from launch vehicles and lunar rovers to scientific spacecraft and associated experiments. Ultimately, the work performed will lead to the fielding of a robust space transportation solution that will carry international explorers and essential payloads for sustainable scientific discovery beyond planet Earth.

  2. Small Engine Technology (SET) Task 23 ANOPP Noise Prediction for Small Engines, Wing Reflection Code

    NASA Technical Reports Server (NTRS)

    Lieber, Lysbeth; Brown, Daniel; Golub, Robert A. (Technical Monitor)

    2000-01-01

    The work performed under Task 23 consisted of the development and demonstration of improvements for the NASA Aircraft Noise Prediction Program (ANOPP), specifically targeted to the modeling of engine noise enhancement due to wing reflection. This report focuses on development of the model and procedure to predict the effects of wing reflection, and the demonstration of the procedure, using a representative wing/engine configuration.

  3. Perspectives on knowledge in engineering design

    NASA Technical Reports Server (NTRS)

    Rasdorf, W. J.

    1985-01-01

    Various perspectives are given of the knowledge currently used in engineering design, specifically dealing with knowledge-based expert systems (KBES). Constructing an expert system often reveals inconsistencies in domain knowledge while formalizing it. The types of domain knowledge (facts, procedures, judgments, and control) differ from the classes of that knowledge (creative, innovative, and routine). The feasible tasks for expert systems can be determined based on these types and classes of knowledge. Interpretive tasks require reasoning about a task in light of the knowledge available, where generative tasks create potential solutions to be tested against constraints. Only after classifying the domain by type and level can the engineer select a knowledge-engineering tool for the domain being considered. The critical features to be weighed after classification are knowledge representation techniques, control strategies, interface requirements, compatibility with traditional systems, and economic considerations.

  4. An Exposure Prevention Plan for an Anhydrous Ammonia Handling System

    NASA Technical Reports Server (NTRS)

    Padolewski, Cathy L.; Bower, Amy; Ponikvar, Gary; Mellott, Ken

    1997-01-01

    In July of 1996, the Industrial Hygiene Team of the Environmental Management Office at NASA Lewis Research Center was contacted by the Space Station Program Office to conduct ammonia awareness training for a team of engineers and technicians. The team was tasked with assembling and operating an ammonia handling system for testing of a photovoltaic radiator at the NASA Plum Brook Station Space Power Facility. The ammonia handling system supports a radiator designed to radiate excess heat from a photovoltaic array module used to provide power to the International Space Station. The system would consist of a hazardous materials trailer equipped with an anhydrous ammonia tank, heater, accumulator, chiller, and flow bench. Meetings were held with representatives from the Space Station Program Office, the engineers and Plum Brook safety personnel. Guidance was also provided by representatives from Kennedy Space Center. Determinations were made concerning the locations and types of potential exposures and a plan was developed which included training, personal protective equipment, engineering controls and emergency response. Various organizations including the Plum Brook Safety Committee, the Lewis Environmental Management Office, the Test Readiness Review Board and the Program Office all had requirements that had to be met in order to satisfy themselves that all personnel involved in the operation of the system would be safe. What resulted was a comprehensive plan that provided more than adequate safety measures and succeeded in protecting all personnel from the hazards of the ammonia system. Testing of the photovoltaic radiator was successful and although ammonia leaks were detected and maintenance of the system was ongoing, no one was injured. It was felt that the training and controls in place allowed for a comfort level that did not interfere with the operations.

  5. The Use of Logistic Model in RUL Assessment

    NASA Astrophysics Data System (ADS)

    Gumiński, R.; Radkowski, S.

    2017-12-01

    The paper takes on the issue of assessment of remaining useful life (RUL). The goal of the paper was to develop a method, which would enable use of diagnostic information in the task of reducing the uncertainty related to technical risk. Prediction of the remaining useful life (RUL) of the system is a very important task for maintenance strategy. In the literature RUL of an engineering system is defined as the first future time instant in which thresholds of conditions (safety, operational quality, maintenance cost, etc) are violated. Knowledge of RUL offers the possibility of planning the testing and repair activities. Building models of damage development is important in this task. In the presented work, logistic function will be used to model fatigue crack development. It should be remembered that modeling of every phase of damage development is very difficult, yet modeling of every phase of damage separately, especially including on-line diagnostic information is more effective. Particular attention was paid to the possibility of forecasting the occurrence of damage due to fatigue while relying on the analysis of the structure of a vibroacoustic signal.

  6. Immediate and Sustained Effects of Planning in a Problem-Solving Task

    ERIC Educational Resources Information Center

    Delaney, Peter F.; Ericsson, K. Anders; Knowles, Martin E.

    2004-01-01

    In 4 experiments, instructions to plan a task (water jugs) that normally produces little planning altered how participants solved the problems and resulted in enhanced learning and memory. Experiment 1 identified planning strategies that allowed participants to plan full solutions to water jugs problems. Experiment 2 showed that experience with…

  7. 46 CFR 189.55-5 - Plans and specifications required for new construction.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) OCEANOGRAPHIC RESEARCH VESSELS INSPECTION AND CERTIFICATION Plan Approval § 189.55-5 Plans and specifications..., carbon dioxide, foam and sprinkling systems. (e) Marine engineering. For plans required for marine engineering equipment and systems. See Subchapter F (Marine Engineering) of this chapter. (f) Electrical...

  8. 46 CFR 189.55-5 - Plans and specifications required for new construction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) OCEANOGRAPHIC RESEARCH VESSELS INSPECTION AND CERTIFICATION Plan Approval § 189.55-5 Plans and specifications..., carbon dioxide, foam and sprinkling systems. (e) Marine engineering. For plans required for marine engineering equipment and systems. See Subchapter F (Marine Engineering) of this chapter. (f) Electrical...

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fred D. Brent; Lalit Shah; Earl Berry

    The overall objective of this project is the three phase development of an Early Entrance Coproduction Plant (EECP) which uses petroleum coke to produce at least one product from at least two of the following three categories: (1) electric power (or heat), (2) fuels, and (3) chemicals using ChevronTexaco's proprietary gasification technology. The objective of Phase I is to determine the feasibility and define the concept for the EECP located at a specific site; develop a Research, Development, and Testing (RD&T) Plan to mitigate technical risks and barriers; and prepare a Preliminary Project Financing Plan. The objective of Phase IImore » is to implement the work as outlined in the Phase I RD&T Plan to enhance the development and commercial acceptance of coproduction technology. The objective of Phase III is to develop an engineering design package and a financing and testing plan for an EECP located at a specific site. The project's intended result is to provide the necessary technical, economic, and environmental information needed by industry to move the EECP forward to detailed design, construction, and operation. The partners in this project are Texaco Energy Systems LLC or TES (a subsidiary of ChevronTexaco), General Electric (GE), Praxair, and Kellogg Brown & Root (KBR) in addition to the U.S. Department of Energy (DOE). TES is providing gasification technology and Fischer-Tropsch (F-T) technology developed by Rentech, GE is providing combustion turbine technology, Praxair is providing air separation technology, and KBR is providing engineering. Each of the EECP subsystems was assessed for technical risks and barriers. A plan was developed to mitigate the identified risks (Phase II RD&T Plan, October 2000). The potential technical and economic risks to the EECP from Task 2.5 can be mitigated by demonstrating that the end-use products derived from the upgrading of the F-T synthesis total liquid product can meet or exceed current specifications for the manufacture of ethylene and propylene chemicals from F-T naphtha, for the generation of hydrogen from F-T naphtha to power fuel cells, for direct blending of F-T diesels into transportation fuels, for the conversion of F-T heavy product wax to transportation fuels, and the conversion of F-T Heavy product wax to a valuable high melting point food-grade specialty wax product. Product evaluations conducted under Task 2.5 of Phase II successfully mitigated the above technical and economic risks to the EECP with the development of product yields and product qualities for the production of chemicals, transportation fuels, and specialty food-grade waxes from the F-T synthesis products.« less

  10. Perspectives and Plans for Graduate Studies. 11. Engineering 1974. E. Industrial Engineering and Systems Design. Report No. 74-22.

    ERIC Educational Resources Information Center

    Ontario Council on Graduate Studies, Toronto. Advisory Committee on Academic Planning.

    On the instruction of the Council of Ontario Universities, the Advisory Committee on Academic Planning in cooperation with the Committee of Ontario Deans of Engineering has conducted a planning assessment for doctoral work in industrial engineering and systems design. Recommendations for doctoral work in engineering studies are presented.…

  11. Automotive Stirling Engine Development Program

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The third quarter (April-June, 1978) effort of the Ford/DOE Automotive Stirling Engine Development Program is reported, specifically Task 1 of that effort, which is Fuel Economy Assessment. At the end of this quarter the total fourth generation fuel economy projection was 26.12 MPG (gasoline) with a confidence level of 44%. This represents an improvement of 66.4% over the baseline M-H fuel economy of 15.7 MPG. The confidence level for the original 20.6 MPG goal has been increased from 53% to 57%. Engine 3X17 has accumulated a total of 213 hours of variable speed running. A summary of the individual sub-tasks of Task 1 are given. The sub-tasks are grouped into two categories: Category 1 consists of those sub-tasks which are directly related to fuel economy and Category 2 consists of those sub-tasks which are not directly related to fuel economy but are an integral part of the Task 1 effort.

  12. Strategic and Unpressured Within-Task Planning and Their Associations with Working Memory

    ERIC Educational Resources Information Center

    Li, Shaofeng; Fu, Mengxia

    2018-01-01

    This study investigated the comparative effects of strategic and unpressured within-task planning on second language (L2) Chinese oral production and the role of working memory in mediating the effects of the two types of planning. Twenty-nine L2 Chinese learners at a large New Zealand university performed a narrative task after watching a…

  13. Two criteria for the selection of assembly plans - Maximizing the flexibility of sequencing the assembly tasks and minimizing the assembly time through parallel execution of assembly tasks

    NASA Technical Reports Server (NTRS)

    Homem De Mello, Luiz S.; Sanderson, Arthur C.

    1991-01-01

    The authors introduce two criteria for the evaluation and selection of assembly plans. The first criterion is to maximize the number of different sequences in which the assembly tasks can be executed. The second criterion is to minimize the total assembly time through simultaneous execution of assembly tasks. An algorithm that performs a heuristic search for the best assembly plan over the AND/OR graph representation of assembly plans is discussed. Admissible heuristics for each of the two criteria introduced are presented. Some implementation issues that affect the computational efficiency are addressed.

  14. PEP Run Report for Integrated Test A, Caustic Leaching in UFP-VSL-T01A, Oxidative Leaching in UFP-VSL-T02A

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Guzman-Leong, Consuelo E.; Bredt, Ofelia P.; Burns, Carolyn A.

    2009-12-04

    Pacific Northwest National Laboratory (PNNL) was tasked by Bechtel National Inc. (BNI) on the River Protection Project-Hanford Tank Waste Treatment and Immobilization Plant (RPP-WTP) project to perform research and development activities to resolve technical issues identified for the Pretreatment Facility (PTF). The Pretreatment Engineering Platform (PEP) was designed and constructed and operated as part of a plan to respond to issue M12, “Undemonstrated Leaching Processes.”(a) The PEP, located in the Process Engineering Laboratory-West (PDLW) located in Richland, Washington, is a 1/4.5-scale test platform designed to simulate the WTP pretreatment caustic leaching, oxidative leaching, ultrafiltration solids concentration, and slurry washing processes.more » The PEP replicates the WTP leaching processes using prototypic equipment and control strategies. The PEP also includes non-prototypic ancillary equipment to support the core processing.« less

  15. Usability evaluation of an emergency department information system prototype designed using cognitive systems engineering techniques.

    PubMed

    Clark, Lindsey N; Benda, Natalie C; Hegde, Sudeep; McGeorge, Nicolette M; Guarrera-Schick, Theresa K; Hettinger, A Zachary; LaVergne, David T; Perry, Shawna J; Wears, Robert L; Fairbanks, Rollin J; Bisantz, Ann M

    2017-04-01

    This article presents an evaluation of novel display concepts for an emergency department information system (EDIS) designed using cognitive systems engineering methods. EDISs assist emergency medicine staff with tracking patient care and ED resource allocation. Participants performed patient planning and orientation tasks using the EDIS displays and rated the display's ability to support various cognitive performance objectives along with the usability, usefulness, and predicted frequency of use for 18 system components. Mean ratings were positive for cognitive performance support objectives, usability, usefulness, and frequency of use, demonstrating the successful application of design methods to create useful and usable EDIS concepts that provide cognitive support for emergency medicine staff. Nurse and provider roles had significantly different perceptions of the usability and usefulness of certain EDIS components, suggesting that they have different information needs while working. Copyright © 2016 Elsevier Ltd. All rights reserved.

  16. Usability evaluation of an emergency department information system prototype designed using cognitive systems engineering techniques

    PubMed Central

    Clark, Lindsey N.; Benda, Natalie C.; Hegde, Sudeep; McGeorge, Nicolette M.; Guarrera-Schick, Theresa K.; Hettinger, A. Zachary; LaVergne, David T.; Perry, Shawna J.; Wears, Robert L.; Fairbanks, Rollin J.; Bisantz, Ann M.

    2017-01-01

    This article presents an evaluation of novel display concepts for an emergency department information system (EDIS) designed using cognitive systems engineering methods. EDISs assist emergency medicine staff with tracking patient care and ED resource allocation. Participants performed patient planning and orientation tasks using the EDIS displays and rated the display’s ability to support various cognitive performance objectives along with the usability, usefulness, and predicted frequency of use for 18 system components. Mean ratings were positive for cognitive performance support objectives, usability, usefulness, and frequency of use, demonstrating the successful application of design methods to create useful and usable EDIS concepts that provide cognitive support for emergency medicine staff. Nurse and provider roles had significantly different perceptions of the usability and usefulness of certain EDIS components, suggesting that they have different information needs while working. PMID:28166896

  17. Drexel at TREC 2014 Federated Web Search Track

    DTIC Science & Technology

    2014-11-01

    of its input RS results. 1. INTRODUCTION Federated Web Search is the task of searching multiple search engines simultaneously and combining their...or distributed properly[5]. The goal of RS is then, for a given query, to select only the most promising search engines from all those available. Most...result pages of 149 search engines . 4000 queries are used in building the sample set. As a part of the Vertical Selection task, search engines are

  18. Efficiency in Rule- vs. Plan-Based Movements Is Modulated by Action-Mode.

    PubMed

    Scheib, Jean P P; Stoll, Sarah; Thürmer, J Lukas; Randerath, Jennifer

    2018-01-01

    The rule/plan motor cognition (RPMC) paradigm elicits visually indistinguishable motor outputs, resulting from either plan- or rule-based action-selection, using a combination of essentially interchangeable stimuli. Previous implementations of the RPMC paradigm have used pantomimed movements to compare plan- vs. rule-based action-selection. In the present work we attempt to determine the generalizability of previous RPMC findings to real object interaction by use of a grasp-to-rotate task. In the plan task, participants had to use prospective planning to achieve a comfortable post-handle rotation hand posture. The rule task used implementation intentions (if-then rules) leading to the same comfortable end-state. In Experiment A, we compare RPMC performance of 16 healthy participants in pantomime and real object conditions of the experiment, within-subjects. Higher processing efficiency of rule- vs. plan-based action-selection was supported by diffusion model analysis. Results show a significant response-time increase in the pantomime condition compared to the real object condition and a greater response-time advantage of rule-based vs. plan-based actions in the pantomime compared to the real object condition. In Experiment B, 24 healthy participants performed the real object RPMC task in a task switching vs. a blocked condition. Results indicate that plan-based action-selection leads to longer response-times and less efficient information processing than rule-based action-selection in line with previous RPMC findings derived from the pantomime action-mode. Particularly in the task switching mode, responses were faster in the rule compared to the plan task suggesting a modulating influence of cognitive load. Overall, results suggest an advantage of rule-based action-selection over plan-based action-selection; whereby differential mechanisms appear to be involved depending on the action-mode. We propose that cognitive load is a factor that modulates the advantageous effect of implementation intentions in motor cognition on different levels as illustrated by the varying speed advantages and the variation in diffusion parameters per action-mode or condition, respectively.

  19. Life with Four Billion Atoms

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Knight, Thomas

    2013-04-10

    Today it is commonplace to design and construct single silicon chips with billions of transistors. These are complex systems, difficult (but possible) to design, test, and fabricate. Remarkably, simple living systems can be assembled from a similar number of atoms, most of them in water molecules. In this talk I will present the current status of our attempts at full understanding and complexity reduction of one of the simplest living systems, the free-living bacterial species Mesoplasma florum. This 400 nm diameter cell thrives and replicates every 40 minutes with a genome of only 800 kilobases. Our recent experiments using transposonmore » gene knockouts identified 354 of 683 annotated genes as inessential in laboratory culture when inactivated individually. While a functional redesigned genome will certainly not remove all of those genes, this suggests that roughly half the genome can be removed in an intentional redesign. I will discuss our recent knockout results and methodology, and our future plans for Genome re-engineering using targeted knock-in/knock-out double recombination; whole cell metabolic models; comprehensive whole cell metabolite measurement techniques; creation of plug-and-play metabolic modules for the simplified organism; inherent and engineered biosafety control mechanisms. This redesign is part of a comprehensive plan to lay the foundations for a new discipline of engineering biology. Engineering biological systems requires a fundamentally different viewpoint from that taken by the science of biology. Key engineering principles of modularity, simplicity, separation of concerns, abstraction, flexibility, hierarchical design, isolation, and standardization are of critical importance. The essence of engineering is the ability to imagine, design, model, build, and characterize novel systems to achieve specific goals. Current tools and components for these tasks are primitive. Our approach is to create and distribute standard biological parts, organisms, assembly techniques, and measurement techniques as a way of enabling this new field.« less

  20. Revisiting Training and Verification Process Implementation for Risk Reduction on New Missions at NASA Jet Propulsion Laboratory

    NASA Technical Reports Server (NTRS)

    Bryant, Larry W.; Fragoso, Ruth S.

    2007-01-01

    In 2003 we proposed an effort to develop a core program of standardized training and verification practices and standards against which the implementation of these practices could be measured. The purpose was to provide another means of risk reduction for deep space missions to preclude the likelihood of a repeat of the tragedies of the 1998 Mars missions. We identified six areas where the application of standards and standardization would benefit the overall readiness process for flight projects at JPL. These are Individual Training, Team Training, Interface and Procedure Development, Personnel Certification, Interface and procedure Verification, and Operations Readiness Testing. In this paper we will discuss the progress that has been made in the tasks of developing the proposed infrastructure in each of these areas. Specifically we will address the Position Training and Certification Standards that are now available for each operational position found on our Flight Operations Teams (FOT). We will also discuss the MGSS Baseline Flight Operations Team Training Plan which can be tailored for each new flight project at JPL. As these tasks have been progressing, the climate and emphasis for Training and for V and V at JPL has changed, and we have learned about the expansion, growth, and limitations in the roles of traditional positions at JPL such as the Project's Training Engineer, V and V Engineer, and Operations Engineer. The need to keep a tight rein on budgets has led to a merging and/or reduction in these positions which pose challenges to individual capacities and capabilities. We examine the evolution of these processes and the roles involved while taking a look at the impact or potential impact of our proposed training related infrastructure tasks. As we conclude our examination of the changes taking place for new flight projects, we see that the importance of proceeding with our proposed tasks and adapting them to the changing climate remains an important element in reducing the risk in the challenging business of space exploration.

  1. A general engineering scenario for concurrent engineering environments

    NASA Astrophysics Data System (ADS)

    Mucino, V. H.; Pavelic, V.

    The paper describes an engineering method scenario which categorizes the various activities and tasks into blocks seen as subjects which consume and produce data and information. These methods, tools, and associated utilities interact with other engineering tools by exchanging information in such a way that a relationship between customers and suppliers of engineering data is established clearly, while data exchange consistency is maintained throughout the design process. The events and data transactions are presented in the form of flowcharts in which data transactions represent the connection between the various bricks, which in turn represent the engineering activities developed for the particular task required in the concurrent engineering environment.

  2. Task-level control for autonomous robots

    NASA Technical Reports Server (NTRS)

    Simmons, Reid

    1994-01-01

    Task-level control refers to the integration and coordination of planning, perception, and real-time control to achieve given high-level goals. Autonomous mobile robots need task-level control to effectively achieve complex tasks in uncertain, dynamic environments. This paper describes the Task Control Architecture (TCA), an implemented system that provides commonly needed constructs for task-level control. Facilities provided by TCA include distributed communication, task decomposition and sequencing, resource management, monitoring and exception handling. TCA supports a design methodology in which robot systems are developed incrementally, starting first with deliberative plans that work in nominal situations, and then layering them with reactive behaviors that monitor plan execution and handle exceptions. To further support this approach, design and analysis tools are under development to provide ways of graphically viewing the system and validating its behavior.

  3. International Space Station Medical Project

    NASA Technical Reports Server (NTRS)

    Starkey, Blythe A.

    2008-01-01

    The goals and objectives of the ISS Medical Project (ISSMP) are to: 1) Maximize the utilization the ISS and other spaceflight platforms to assess the effects of longduration spaceflight on human systems; 2) Devise and verify strategies to ensure optimal crew performance; 3) Enable development and validation of a suite of integrated physical (e.g., exercise), pharmacologic and/or nutritional countermeasures against deleterious effects of space flight that may impact mission success or crew health. The ISSMP provides planning, integration, and implementation services for Human Research Program research tasks and evaluation activities requiring access to space or related flight resources on the ISS, Shuttle, Soyuz, Progress, or other spaceflight vehicles and platforms. This includes pre- and postflight activities; 2) ISSMP services include operations and sustaining engineering for HRP flight hardware; experiment integration and operation, including individual research tasks and on-orbit validation of next generation on-orbit equipment; medical operations; procedures development and validation; and crew training tools and processes, as well as operation and sustaining engineering for the Telescience Support Center; and 3) The ISSMP integrates the HRP approved flight activity complement and interfaces with external implementing organizations, such as the ISS Payloads Office and International Partners, to accomplish the HRP's objectives. This effort is led by JSC with Baseline Data Collection support from KSC.

  4. 14 CFR 151.111 - Advance planning proposals: General.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Engineering Proposals § 151.111 Advance planning proposals: General. (a) Each advance planning and engineering... application, under §§ 151.21(c) and 151.27, or both. (c) Each proposal must relate to planning and engineering... “Airport Activity Statistics of Certificated Route Air Carriers” (published jointly by FAA and the Civil...

  5. WAG 2 remedial investigation and site investigation site-specific work plan/health and safety checklist for the soil and sediment task. Environmental Restoration Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Holt, V.L.; Burgoa, B.B.

    1993-12-01

    This document is a site-specific work plan/health and safety checklist (WP/HSC) for a task of the Waste Area Grouping 2 Remedial Investigation and Site Investigation (WAG 2 RI&SI). Title 29 CFR Part 1910.120 requires that a health and safety program plan that includes site- and task-specific information be completed to ensure conformance with health- and safety-related requirements. To meet this requirement, the health and safety program plan for each WAG 2 RI&SI field task must include (1) the general health and safety program plan for all WAG 2 RI&SI field activities and (2) a WP/HSC for that particular field task.more » These two components, along with all applicable referenced procedures, must be kept together at the work site and distributed to field personnel as required. The general health and safety program plan is the Health and Safety Plan for the Remedial Investigation and Site Investigation of Waste Area Grouping 2 at the Oak Ridge National Laboratory, Oak Ridge, Tennessee (ORNL/ER-169). The WP/HSCs are being issued as supplements to ORNL/ER-169.« less

  6. Determining robot actions for tasks requiring sensor interaction

    NASA Technical Reports Server (NTRS)

    Budenske, John; Gini, Maria

    1989-01-01

    The performance of non-trivial tasks by a mobile robot has been a long term objective of robotic research. One of the major stumbling blocks to this goal is the conversion of the high-level planning goals and commands into the actuator and sensor processing controls. In order for a mobile robot to accomplish a non-trivial task, the task must be described in terms of primitive actions of the robot's actuators. Most non-trivial tasks require the robot to interact with its environment; thus necessitating coordination of sensor processing and actuator control to accomplish the task. The main contention is that the transformation from the high level description of the task to the primitive actions should be performed primarily at execution time, when knowledge about the environment can be obtained through sensors. It is proposed to produce the detailed plan of primitive actions by using a collection of low-level planning components that contain domain specific knowledge and knowledge about the available sensors, actuators, and sensor/actuator processing. This collection will perform signal and control processing as well as serve as a control interface between an actual mobile robot and a high-level planning system. Previous research has shown the usefulness of high-level planning systems to plan the coordination of activities such to achieve a goal, but none have been fully applied to actual mobile robots due to the complexity of interacting with sensors and actuators. This control interface is currently being implemented on a LABMATE mobile robot connected to a SUN workstation and will be developed such to enable the LABMATE to perform non-trivial, sensor-intensive tasks as specified by a planning system.

  7. Perspectives and Plans for Graduate Studies. 11. Engineering 1974. D. Mechanical Engineering. Report No. 74-21.

    ERIC Educational Resources Information Center

    Ontario Council on Graduate Studies, Toronto. Advisory Committee on Academic Planning.

    On the instruction of the Council of Ontario Universities, the Advisory Committee on Academic Planning in cooperation with the Committee of Ontario Deans of Engineering has conducted a planning assessment for doctoral work in mechanical engineering. This report presents as overview of the recommendations for each of the assessments conducted in…

  8. Familiarity and Personal Experience as Mediators of Recall when Planning for Future Contingencies

    ERIC Educational Resources Information Center

    Klein, Stanley B.; Robertson, Theresa E.; Delton, Andrew W.; Lax, Moshe L.

    2012-01-01

    In this article, we demonstrate that planning tasks enhance recall when the context of planning (a) is self-referential and (b) draws on familiar scenarios represented in episodic memory. Specifically, we show that when planning tasks are sorted according to the degree to which they evoke memories of personally familiar scenarios (e.g., planning a…

  9. Space station human productivity study. Volume 5: Management plans

    NASA Technical Reports Server (NTRS)

    1985-01-01

    The 67 Management Plans represent recommended study approaches for resolving 108 of the 305 Issues which were identified. Each study Management Plan is prepared in three formats: Management Plan Overview (lists the subsumed Issues, study background, and related overview information); Study Plan (details the study approach by tasks, lists special needs, and describes expected study products); Schedule-Task Flow (provides a time-lined schedule for the study tasks and resource requirements). The Management Relationships Matrix, included in this volume, shows the data input-output relationships among all recommended studies. A listing is also included which cross-references the unresolved requirements to Issues to management plans. A glossary of all abbreviations utilized is provided.

  10. Composite Structures Materials Testing for the Orion Crew Vehicle Heat Shield

    NASA Technical Reports Server (NTRS)

    Khemani, Farah N.

    2011-01-01

    As research is being performed for the new heat shield for the Orion capsule, National Aeronautics and Space Administration (NASA) is developing the first composite heat shield. As an intern of the Structures Branch in the Engineering Directorate (ES 2), my main task was to set up a test plan to determine the material properties of the honeycomb that will be used on the Orion Crew Module heat shield to verify that the composite is suitable for the capsule. Before conducting composite shell tests, which are performed to simulate the crush performance of the heat shield on the capsule, it is necessary to determine the compression and shear properties of the composite used on the shell. During this internship, I was responsible for developing a test plan, designing parts for the test fixtures as well as getting them fabricated for the honeycomb shear and compression testing. This involved work in Pro/Engineer as well as coordinating with Fab Express, the Building 9 Composite Shop and the Structures Test Laboratory (STL). The research and work executed for this project will be used for composite sandwich panel testing in the future as well. As a part of the Structures Branch, my main focus was to research composite structures. This involves system engineering and integration (SE&I) integration, manufacturing, and preliminary testing. The procedures for these projects that were executed during this internship included design work, conducting tests and performing analysis.

  11. Intelligent Systems For Aerospace Engineering: An Overview

    NASA Technical Reports Server (NTRS)

    KrishnaKumar, K.

    2003-01-01

    Intelligent systems are nature-inspired, mathematically sound, computationally intensive problem solving tools and methodologies that have become extremely important for advancing the current trends in information technology. Artificially intelligent systems currently utilize computers to emulate various faculties of human intelligence and biological metaphors. They use a combination of symbolic and sub-symbolic systems capable of evolving human cognitive skills and intelligence, not just systems capable of doing things humans do not do well. Intelligent systems are ideally suited for tasks such as search and optimization, pattern recognition and matching, planning, uncertainty management, control, and adaptation. In this paper, the intelligent system technologies and their application potential are highlighted via several examples.

  12. Battlefield Realism: The Impact of Opposing Force (OPFOR) on Friendly Force Task Performance with Implications for the National Training Center. Volume 2. OPFOR Lessons Learned

    DTIC Science & Technology

    1981-02-01

    eight years in the Army. I don’t think that any of us are getting the training that it takes to show us what we are going to be up against. I’n more sure...to its fullest extent may have been attributed to the lack of training on how to use and employ combat engineers. We just do not think about their use...training in this type of scenario, they would not have as much difficulty in coping with It. Learn to think , develop plans and organize. Ask the right

  13. Software engineering and data management for automated payload experiment tool

    NASA Technical Reports Server (NTRS)

    Maddux, Gary A.; Provancha, Anna; Chattam, David

    1994-01-01

    The Microgravity Projects Office identified a need to develop a software package that will lead experiment developers through the development planning process, obtain necessary information, establish an electronic data exchange avenue, and allow easier manipulation/reformatting of the collected information. An MS-DOS compatible software package called the Automated Payload Experiment Tool (APET) has been developed and delivered. The objective of this task is to expand on the results of the APET work previously performed by University of Alabama in Huntsville (UAH) and provide versions of the software in a Macintosh and Windows compatible format. Appendix 1 science requirements document (SRD) Users Manual is attached.

  14. Development of a patient-specific surgical simulator for pediatric laparoscopic procedures.

    PubMed

    Saber, Nikoo R; Menon, Vinay; St-Pierre, Jean C; Looi, Thomas; Drake, James M; Cyril, Xavier

    2014-01-01

    The purpose of this study is to develop and evaluate a pediatric patient-specific surgical simulator for the planning, practice, and validation of laparoscopic surgical procedures prior to intervention, initially focusing on the choledochal cyst resection and reconstruction scenario. The simulator is comprised of software elements including a deformable body physics engine, virtual surgical tools, and abdominal organs. Hardware components such as haptics-enabled hand controllers and a representative endoscopic tool have also been integrated. The prototype is able to perform a number of surgical tasks and further development work is under way to simulate the complete procedure with acceptable fidelity and accuracy.

  15. JT9D engine diagnostics. Task 2: Feasibility study of measuring in-service flight loads. [747 aircraft performance

    NASA Technical Reports Server (NTRS)

    Kafka, P. G.; Skibo, M. A.; White, J. L.

    1977-01-01

    The feasibility of measuring JT9D propulsion system flight inertia loads on a 747 airplane is studied. Flight loads background is discussed including the current status of 747/JT9D loads knowledge. An instrumentation and test plan is formulated for an airline-owned in-service airplane and the Boeing-owned RA001 test airplane. Technical and cost comparisons are made between these two options. An overall technical feasibility evaluation is made and a cost summary presented. Conclusions and recommendations are presented in regard to using existing inertia loads data versus conducting a flight test to measure inertia loads.

  16. Intelligent Systems for Aerospace Engineering: An Overview

    NASA Technical Reports Server (NTRS)

    Krishnakumar, Kalmanje

    2002-01-01

    Intelligent systems are nature-inspired, mathematically sound, computationally intensive problem solving tools and methodologies that have become extremely important for advancing the current trends in information technology. Artificially intelligent systems currently utilize computers to emulate various faculties of human intelligence and biological metaphors. They use a combination of symbolic and sub-symbolic systems capable of evolving human cognitive skills and intelligence, not just systems capable of doing things humans do not do well. Intelligent systems are ideally suited for tasks such as search and optimization, pattern recognition and matching, planning, uncertainty management, control, and adaptation. In this paper, the intelligent system technologies and their application potential are highlighted via several examples.

  17. Summary of Research 2003

    DTIC Science & Technology

    2005-01-01

    Surface Tasks ................................................................................................... 250 Goali : Creep and Microstructural...SURFACE TASKS Morris Driels, Professor Department of Mechanical Engineering Sponsor: U.S. Army Materiel Systems Analysis Activity GOALI : CREEP AND...Professor Department of Mechanical Engineering Sponsor: National Science Foundation SUMMARY: This GOALI (Grant Opportunities for Academic Liaison

  18. Technology implications of a cognitive task analysis for locomotive engineers

    DOT National Transportation Integrated Search

    2009-01-01

    This report documents the results of a cognitive task analysis (CTA) that examined the cognitive demands and activities of locomotive engineers in todays environment and the changes in cognitive demands and activities that are likely to arise with...

  19. Discharge Planning Revisited: What Do Social Workers Actually Do in Discharge Planning?

    ERIC Educational Resources Information Center

    Kadushin, Goldie; Kulys, Regina

    1993-01-01

    Interviewed 80 social workers in 36 acute care hospitals concerning amount of time they spent on and importance of 73 discharge planning tasks. Findings suggest that discharge planning comprises primarily concrete resource provision with counseling component focused on decision making. Time spent on tasks was influenced by prospective payment…

  20. A Test of Motor (Not Executive) Planning in Developmental Coordination Disorder and Autism

    ERIC Educational Resources Information Center

    van Swieten, Lisa M.; van Bergen, Elsje; Williams, Justin H. G.; Wilson, Andrew D.; Plumb, Mandy S.; Kent, Samuel W.; Mon-Williams, Mark A.

    2010-01-01

    Grip selection tasks have been used to test "planning" in both autism and developmental coordination disorder (DCD). We differentiate between "motor" and "executive" planning and present a modified motor planning task. Participants grasped a cylinder in 1 of 2 orientations before turning it clockwise or anticlockwise.…

  1. Still Not Enough Time in the Day: Media Specialists, Program Planning and Time Management, Part II

    ERIC Educational Resources Information Center

    Fitzgerald, Mary Ann; Waldrip, Andrea

    2004-01-01

    The ways in which one can keep the library media plan on track in the face of the realistic challenges faced by media are discussed. A system for prioritizing tasks, both planned goal-related tasks and tasks that walk in the door in varying degrees of emergency status and by need of more time management strategies could be used. [For Part I, see…

  2. The Effects of Simultaneous Use of Careful Online Planning and Task Repetition on Accuracy, Complexity, and Fluency in EFL Learners' Oral Production

    ERIC Educational Resources Information Center

    Ahmadian, Mohammad Javad; Tavakoli, Mansoor

    2011-01-01

    This article reports on a study that was primarily aimed at investigating the effects of simultaneous use of careful online planning and task repetition on accuracy, complexity, and fluency in the oral production of learners of English as a foreign language (EFL). The effects of four planning and task repetition conditions (i.e. careful online…

  3. Automation based on knowledge modeling theory and its applications in engine diagnostic systems using Space Shuttle Main Engine vibrational data. M.S. Thesis

    NASA Technical Reports Server (NTRS)

    Kim, Jonnathan H.

    1995-01-01

    Humans can perform many complicated tasks without explicit rules. This inherent and advantageous capability becomes a hurdle when a task is to be automated. Modern computers and numerical calculations require explicit rules and discrete numerical values. In order to bridge the gap between human knowledge and automating tools, a knowledge model is proposed. Knowledge modeling techniques are discussed and utilized to automate a labor and time intensive task of detecting anomalous bearing wear patterns in the Space Shuttle Main Engine (SSME) High Pressure Oxygen Turbopump (HPOTP).

  4. Engineering Technical Review Planning Briefing

    NASA Technical Reports Server (NTRS)

    Gardner, Terrie

    2012-01-01

    The general topics covered in the engineering technical planning briefing are 1) overviews of NASA, Marshall Space Flight Center (MSFC), and Engineering, 2) the NASA Systems Engineering(SE) Engine and its implementation , 3) the NASA Project Life Cycle, 4) MSFC Technical Management Branch Services in relation to the SE Engine and the Project Life Cycle , 5) Technical Reviews, 6) NASA Human Factor Design Guidance , and 7) the MSFC Human Factors Team. The engineering technical review portion of the presentation is the primary focus of the overall presentation and will address the definition of a design review, execution guidance, the essential stages of a technical review, and the overall review planning life cycle. Examples of a technical review plan content, review approaches, review schedules, and the review process will be provided and discussed. The human factors portion of the presentation will focus on the NASA guidance for human factors. Human factors definition, categories, design guidance, and human factor specialist roles will be addressed. In addition, the NASA Systems Engineering Engine description, definition, and application will be reviewed as background leading into the NASA Project Life Cycle Overview and technical review planning discussion.

  5. Planning Abilities in Bilingual and Monolingual Children: Role of Verbal Mediation.

    PubMed

    Gangopadhyay, Ishanti; McDonald, Margarethe; Ellis Weismer, Susan; Kaushanskaya, Margarita

    2018-01-01

    We examined the role of verbal mediation in planning performance of English-Spanish-speaking bilingual children and monolingual English-speaking children, between the ages of 9 and 12 years. To measure planning, children were administered the Tower of London (ToL) task. In a dual-task paradigm, children completed ToL problems under three conditions: with no secondary task (baseline), with articulatory suppression, and with non-verbal motor suppression. Analyses revealed generally shorter planning times for bilinguals than monolinguals but both groups performed similarly on number of moves and execution times. Additionally, bilingual children were more efficient at planning throughout the duration of the task while monolingual children showed significant gains with more practice. Children's planning times under articulatory suppression were significantly shorter than under motor suppression as well as the baseline condition, and there was no difference in planning times between monolingual and bilingual children during articulatory suppression. These results demonstrate that bilingualism influences performance on a complex EF measure like planning, and that these effects are not related to verbal mediation.

  6. Planning Abilities in Bilingual and Monolingual Children: Role of Verbal Mediation

    PubMed Central

    Gangopadhyay, Ishanti; McDonald, Margarethe; Ellis Weismer, Susan; Kaushanskaya, Margarita

    2018-01-01

    We examined the role of verbal mediation in planning performance of English–Spanish-speaking bilingual children and monolingual English-speaking children, between the ages of 9 and 12 years. To measure planning, children were administered the Tower of London (ToL) task. In a dual-task paradigm, children completed ToL problems under three conditions: with no secondary task (baseline), with articulatory suppression, and with non-verbal motor suppression. Analyses revealed generally shorter planning times for bilinguals than monolinguals but both groups performed similarly on number of moves and execution times. Additionally, bilingual children were more efficient at planning throughout the duration of the task while monolingual children showed significant gains with more practice. Children’s planning times under articulatory suppression were significantly shorter than under motor suppression as well as the baseline condition, and there was no difference in planning times between monolingual and bilingual children during articulatory suppression. These results demonstrate that bilingualism influences performance on a complex EF measure like planning, and that these effects are not related to verbal mediation. PMID:29593620

  7. 7 CFR 1710.250 - General.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., and retirements. The primary components of the system consist of long-range engineering plans, construction work plans (CWPs), CWP amendments, and special engineering and cost studies. Long range engineering plans identify plant investments required over a period of 10 years or more. CWPs specify and...

  8. 7 CFR 1710.250 - General.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., and retirements. The primary components of the system consist of long-range engineering plans, construction work plans (CWPs), CWP amendments, and special engineering and cost studies. Long range engineering plans identify plant investments required over a period of 10 years or more. CWPs specify and...

  9. 7 CFR 1710.250 - General.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., and retirements. The primary components of the system consist of long-range engineering plans, construction work plans (CWPs), CWP amendments, and special engineering and cost studies. Long range engineering plans identify plant investments required over a period of 10 years or more. CWPs specify and...

  10. 7 CFR 1710.250 - General.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., and retirements. The primary components of the system consist of long-range engineering plans, construction work plans (CWPs), CWP amendments, and special engineering and cost studies. Long range engineering plans identify plant investments required over a period of 10 years or more. CWPs specify and...

  11. French registry of workers handling engineered nanomaterials as an instrument of integrated system for surveillance and research

    NASA Astrophysics Data System (ADS)

    Guseva Canu, I.; Boutou-Kempf, O.; Delabre, L.; Ducamp, S.; Iwatsubo, Y.; Marchand, J. L.; Imbernon, E.

    2013-04-01

    Despite the lack of data on the human health potential risks related to the engineered nanomaterials (ENM) exposure, ENM handling spreads in industry. The French government officially charged the InVS to develop an epidemiological surveillance of workers occupationally exposed to ENM. An initial surveillance plan was proposed on the basis of literature review and discussions with national and international ENM and occupational safety and health (OSH) experts. In site investigations and technical visits were then carried out to build an adequate surveillance system and to assess its feasibility. The current plan consists of a multi-step methodology where exposure registry construction is paramount. Workers potentially exposed to carbon nanotubes (CNT) or nanometric titanium dioxide (TiO2) will be identified using a 3-level approach: 1-identification and selection of companies concerned with ENM exposure (based on compulsory declaration and questionnaires), 2-in site exposure assessment and identification of the jobs/tasks with ENM exposure (based on job-expose matrix, further supplemented with measurements), and 3-identification of workers concerned. Data of interest will be collected by questionnaire. Companies and workers inclusion questionnaires are designed and currently under validation. This registration is at the moment planned for three years but could be extended and include other ENM. A prospective cohort study will be established from this registry, to pursue surveillance objectives and serve as an infrastructure for performing epidemiological and panel studies with specific research objectives.

  12. Evaluation of scheduling techniques for payload activity planning

    NASA Technical Reports Server (NTRS)

    Bullington, Stanley F.

    1991-01-01

    Two tasks related to payload activity planning and scheduling were performed. The first task involved making a comparison of space mission activity scheduling problems with production scheduling problems. The second task consisted of a statistical analysis of the output of runs of the Experiment Scheduling Program (ESP). Details of the work which was performed on these two tasks are presented.

  13. Guide to DCP Study Close-Out: Milestones and Tasks | Division of Cancer Prevention

    Cancer.gov

    This guide assists Consortium Lead Organization (CLO) planning for DCP study close-out. Study close-out tasks are organized under milestones, which help mark progress toward completion of the close-out process. Once tasks associated with a milestone are underway, planning for the next milestone may begin. Click on a milestone to view the associated close-out tasks. |

  14. The Combined Effects of Online Planning and Task Structure on Complexity, Accuracy and Fluency of L2 Speech

    ERIC Educational Resources Information Center

    Javad Ahmadian, Mohammad; Tavakoli, Mansoor; Vahid Dastjerdi, Hossein

    2015-01-01

    This study investigates the combined effects of task-based careful online planning and the storyline structure of a task on second language performance (complexity, accuracy and fluency). Sixty intermediate EFL learners were randomly assigned to four groups (n = 15). Participants were asked to perform two tasks with different degrees of storyline…

  15. Determination of Tasks Required by Graduates of Manufacturing Engineering Technology Programs.

    ERIC Educational Resources Information Center

    Zirbel, Jay H.

    1993-01-01

    A Delphi panel of 14 experts identified 37 tasks performed by/qualities needed by manufacturing engineering technologists. Most important were work ethic, performance quality, communication skills, teamwork, computer applications, manufacturing basics, materials knowledge, troubleshooting, supervision, and global issues. (SK)

  16. System for Anomaly and Failure Detection (SAFD) system development

    NASA Technical Reports Server (NTRS)

    Oreilly, D.

    1992-01-01

    This task specified developing the hardware and software necessary to implement the System for Anomaly and Failure Detection (SAFD) algorithm, developed under Technology Test Bed (TTB) Task 21, on the TTB engine stand. This effort involved building two units; one unit to be installed in the Block II Space Shuttle Main Engine (SSME) Hardware Simulation Lab (HSL) at Marshall Space Flight Center (MSFC), and one unit to be installed at the TTB engine stand. Rocketdyne personnel from the HSL performed the task. The SAFD algorithm was developed as an improvement over the current redline system used in the Space Shuttle Main Engine Controller (SSMEC). Simulation tests and execution against previous hot fire tests demonstrated that the SAFD algorithm can detect engine failure as much as tens of seconds before the redline system recognized the failure. Although the current algorithm only operates during steady state conditions (engine not throttling), work is underway to expand the algorithm to work during transient condition.

  17. Elementary students' engagement in failure-prone engineering design tasks

    NASA Astrophysics Data System (ADS)

    Andrews, Chelsea Joy

    Although engineering education has been practiced at the undergraduate level for over a century, only fairly recently has the field broadened to include the elementary level; the pre-college division of the American Society of Engineering Education was established in 2003. As a result, while recent education standards require engineering in elementary schools, current studies are still filling in basic research on how best to design and implement elementary engineering activities. One area in need of investigation is how students engage with physical failure in design tasks. In this dissertation, I explore how upper elementary students engage in failure-prone engineering design tasks in an out-of-school environment. In a series of three empirical case studies, I look closely at how students evaluate failed tests and decide on changes to their design constructions, how their reasoning evolves as they repeatedly encounter physical failure, and how students and facilitators co-construct testing norms where repetitive failure is manageable. I also briefly investigate how students' engagement differs in a task that features near-immediate success. By closely examining student groups' discourse and their interactions with their design constructions, I found that these students: are able to engage in iteration and see failure-as-feedback with minimal externally-imposed structure; seem to be designing in a more sophisticated manner, attending to multiple causal factors, after experiencing repetitive failure; and are able to manage the stress and frustration of repetitive failure, provided the co-constructed testing norms of the workshop environment are supportive of failure management. These results have both pedagogical implications, in terms of how to create and facilitate design tasks, and methodological implications--namely, I highlight the particular insights afforded by a case study approach for analyzing engagement in design tasks.

  18. Efficiency in Rule- vs. Plan-Based Movements Is Modulated by Action-Mode

    PubMed Central

    Scheib, Jean P. P.; Stoll, Sarah; Thürmer, J. Lukas; Randerath, Jennifer

    2018-01-01

    The rule/plan motor cognition (RPMC) paradigm elicits visually indistinguishable motor outputs, resulting from either plan- or rule-based action-selection, using a combination of essentially interchangeable stimuli. Previous implementations of the RPMC paradigm have used pantomimed movements to compare plan- vs. rule-based action-selection. In the present work we attempt to determine the generalizability of previous RPMC findings to real object interaction by use of a grasp-to-rotate task. In the plan task, participants had to use prospective planning to achieve a comfortable post-handle rotation hand posture. The rule task used implementation intentions (if-then rules) leading to the same comfortable end-state. In Experiment A, we compare RPMC performance of 16 healthy participants in pantomime and real object conditions of the experiment, within-subjects. Higher processing efficiency of rule- vs. plan-based action-selection was supported by diffusion model analysis. Results show a significant response-time increase in the pantomime condition compared to the real object condition and a greater response-time advantage of rule-based vs. plan-based actions in the pantomime compared to the real object condition. In Experiment B, 24 healthy participants performed the real object RPMC task in a task switching vs. a blocked condition. Results indicate that plan-based action-selection leads to longer response-times and less efficient information processing than rule-based action-selection in line with previous RPMC findings derived from the pantomime action-mode. Particularly in the task switching mode, responses were faster in the rule compared to the plan task suggesting a modulating influence of cognitive load. Overall, results suggest an advantage of rule-based action-selection over plan-based action-selection; whereby differential mechanisms appear to be involved depending on the action-mode. We propose that cognitive load is a factor that modulates the advantageous effect of implementation intentions in motor cognition on different levels as illustrated by the varying speed advantages and the variation in diffusion parameters per action-mode or condition, respectively. PMID:29593612

  19. Effects of Pretask Modeling on Attention to Form and Question Development

    ERIC Educational Resources Information Center

    Kim, YouJin

    2013-01-01

    Over the last two decades, a growing body of research has shown positive impacts for task planning in task-based instruction (e.g., Ellis, 2005; Foster & Skehan, 1996). However, what learners plan during pretask planning, and whether any specific planning strategies are more beneficial in encouraging learners to attend to linguistic forms and…

  20. Exploring Operational Test and Evaluation of Unmanned Aircraft Systems: A Qualitative Case Study

    NASA Astrophysics Data System (ADS)

    Saliceti, Jose A.

    The purpose of this qualitative case study was to explore and identify strategies that may potentially remedy operational test and evaluation procedures used to evaluate Unmanned Aircraft Systems (UAS) technology. The sample for analysis consisted of organizations testing and evaluating UASs (e.g., U.S. Air Force, U.S. Navy, U.S. Army, U.S. Marine Corps, U.S. Coast Guard, and Customs Border Protection). A purposeful sampling technique was used to select 15 subject matter experts in the field of operational test and evaluation of UASs. A questionnaire was provided to participants to construct a descriptive and robust research. Analysis of responses revealed themes related to each research question. Findings revealed operational testers utilized requirements documents to extrapolate measures for testing UAS technology and develop critical operational issues. The requirements documents were (a) developed without the contribution of stakeholders and operational testers, (b) developed with vague or unrealistic measures, and (c) developed without a systematic method to derive requirements from mission tasks. Four approaches are recommended to develop testable operational requirements and assist operational testers: (a) use a mission task analysis tool to derive requirements for mission essential tasks for the system, (b) exercise collaboration among stakeholders and testers to ensure testable operational requirements based on mission tasks, (c) ensure testable measures are used in requirements documents, and (d) create a repository list of critical operational issues by mission areas. The preparation of operational test and evaluation processes for UAS technology is not uniform across testers. The processes in place are not standardized, thus test plan preparation and reporting are different among participants. A standard method to prepare and report UAS technology should be used when preparing and reporting on UAS technology. Using a systematic process, such as mission-based test design, resonated among participants as an analytical method to link UAS mission tasks and measures of performance to the capabilities of the system under test when developing operational test plans. Further research should examine system engineering designs for system requirements traceability matrix of mission tasks and subtasks while using an analysis tool that adequately evaluates UASs with an acceptable level of confidence in the results.

  1. Towards automatic planning for manufacturing generative processes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    CALTON,TERRI L.

    2000-05-24

    Generative process planning describes methods process engineers use to modify manufacturing/process plans after designs are complete. A completed design may be the result from the introduction of a new product based on an old design, an assembly upgrade, or modified product designs used for a family of similar products. An engineer designs an assembly and then creates plans capturing manufacturing processes, including assembly sequences, component joining methods, part costs, labor costs, etc. When new products originate as a result of an upgrade, component geometry may change, and/or additional components and subassemblies may be added to or are omitted from themore » original design. As a result process engineers are forced to create new plans. This is further complicated by the fact that the process engineer is forced to manually generate these plans for each product upgrade. To generate new assembly plans for product upgrades, engineers must manually re-specify the manufacturing plan selection criteria and re-run the planners. To remedy this problem, special-purpose assembly planning algorithms have been developed to automatically recognize design modifications and automatically apply previously defined manufacturing plan selection criteria and constraints.« less

  2. ICTNET at Web Track 2009 Diversity task

    DTIC Science & Technology

    2009-11-01

    performance. On the World Wide Web, there exist many documents which represents several implicit subtopics. We used commerce search engines to gather those...documents. In this task, our work can be divided into five steps. First, we collect documents returned by commerce search engines , and considered

  3. CREASE 6.0 Catalog of Resources for Education in Ada and Software Engineering

    DTIC Science & Technology

    1992-02-01

    Programming Software Engineering Strong Typing Tasking Audene . Computer Scientists Terbook(s): Barnes, J. Programming in Ada, 3rd ed. Addison-Wesley...Ada. Concept: Abstract Data Types Management Overview Package Real-Time Programming Tasking Audene Computer Scientists Textbook(s): Barnes, J

  4. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chu, C.I.C.; Gillespie, B.L.

    One of the most perplexing problems facing the coal industry is how to properly dispose of the waste and/or even recovery a small fraction of the Btu value of the waste, while minimizing the environmental concerns. UCC Research considers this monumental environmental problems as an opportunity to recovery useable organic materials and reduce the environmental problems created by coal waste. Mild gasification is the method used by UCC Research to realize these objectives. Coal feedstocks are fed into the mild gasification system yielding liquids, char, and gases for commercial application. The program consists of seven tasks: Task 1, Characterize Managementmore » of Coal Preparation Wastes; Task 2, Review Design Specifications and Prepare Preliminary Test Plan; Task 3, Select and Characterize Test Feedstocks; Task 4, Acquire/Construct Process Elements; Task 5, Prepare Final Test Plan; Task 6, Implement Final Test Plan; Task 7, Analyze Test Results and Assess System Economics. A schedule of the program is given. The program was initiated on September 30, 1984. Tasks 1, 2, 3, 4, 5, and 6 have been completed. Work is continuing on Task 7.« less

  5. Advanced automation for in-space vehicle processing

    NASA Technical Reports Server (NTRS)

    Sklar, Michael; Wegerif, D.

    1990-01-01

    The primary objective of this 3-year planned study is to assure that the fully evolved Space Station Freedom (SSF) can support automated processing of exploratory mission vehicles. Current study assessments show that required extravehicular activity (EVA) and to some extent intravehicular activity (IVA) manpower requirements for required processing tasks far exceeds the available manpower. Furthermore, many processing tasks are either hazardous operations or they exceed EVA capability. Thus, automation is essential for SSF transportation node functionality. Here, advanced automation represents the replacement of human performed tasks beyond the planned baseline automated tasks. Both physical tasks such as manipulation, assembly and actuation, and cognitive tasks such as visual inspection, monitoring and diagnosis, and task planning are considered. During this first year of activity both the Phobos/Gateway Mars Expedition and Lunar Evolution missions proposed by the Office of Exploration have been evaluated. A methodology for choosing optimal tasks to be automated has been developed. Processing tasks for both missions have been ranked on the basis of automation potential. The underlying concept in evaluating and describing processing tasks has been the use of a common set of 'Primitive' task descriptions. Primitive or standard tasks have been developed both for manual or crew processing and automated machine processing.

  6. Geopressure modeling from petrophysical data: An example from East Kalimantan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Herkommer, M.A.

    1994-07-01

    Localized models of abnormal formation pressure (geopressure) are important economic and safety tools frequently used for well planning and drilling operations. Simplified computer-based procedures have been developed that permit these models to be developed more rapidly and with greater accuracy. These techniques are broadly applicable to basins throughout the world where abnormal formation pressures occur. An example from the Attaka field of East Kalimantan, southeast Asia, shows how geopressure models are developed. Using petrophysical and engineering data, empirical correlations between observed pressure and petrophysical logs can be created by computer-assisted data-fitting techniques. These correlations serve as the basis for modelsmore » of the geopressure. By performing repeated analyses on wells at various locations, contour maps on the top of abnormal geopressure can be created. Methods that are simple in their development and application make the task of geopressure estimation less formidable to the geologist and petroleum engineer. Further, more accurate estimates can significantly improve drilling speeds while reducing the incidence of stuck pipe, kicks, and blowouts. In general, geopressure estimates are used in all phases of drilling operations: To develop mud plans and specify equipment ratings, to assist in the recognition of geopressured formations and determination of mud weights, and to improve predictions at offset locations and geologically comparable areas.« less

  7. Manufacturing Methods and Technology Program Plan. Update.

    DTIC Science & Technology

    1981-11-01

    INDUSTRIAL BASE ENGINEERING ACTIVITY ROCK ISLAND. ILLINOIS 61299 82 INDEX PAGE I. INTRODUCTION The MMT Program Plan Update ........... 1 Industry Guide...obtained from that Plan, extra copies of which are available upon request from the Industrial Base Engineering Activity. Other sources for this data are...Major Subcommands (SUBMACOM’S). The SUBMACOM’S plan, formulate, budget, and execute individual projects. The Industrial Base Engineering Activity

  8. The South Eastern Europe Brigade: An Option for NATO-Led Peace Support Operations?

    DTIC Science & Technology

    2011-06-10

    Exercise CSSB Combat Service Support Battalion DOS Day of Supply DRO Disaster Relief Operations EOD Explosive Ordnance Disposal ETF Engineer Task...the adoption of the second Additional Protocol, the SEEBRIG member nations established an Engineer Task Force ( ETF ). The concept embeds purpose...capabilities, like the ETF structure, could be used as niche military capabilities by outside organizations that may need them. SEEBRIG engineer capabilities

  9. Examining Pharmacy Workforce Issues in the United States and the United Kingdom

    PubMed Central

    Covvey, Jordan R.; Cohron, Peter P.

    2015-01-01

    Objective. To examine available data and actions surrounding current pharmacy workforce issues in the United States and United Kingdom. Methods. Published pharmacy workforce data from the United States and United Kingdom were gathered from various sources, including PUBMED, Internet search engines, and pharmacy organization websites. Data was collated from additional sources including scientific literature, internal documents, news releases, and policy positions. Results. The number of colleges and schools of pharmacy has expanded by approximately 50% in both the United States and United Kingdom over the previous decade. In the United States, continued demand for the pharmacy workforce has been forecasted, but this need is based on outdated supply figures and assumptions for economic recovery. In the United Kingdom, workforce modeling has predicted a significant future oversupply of pharmacists, and action within the profession has attempted to address the situation through educational planning and regulation. Conclusion. Workforce planning is an essential task for sustaining a healthy profession. Recent workforce planning mechanisms in the United Kingdom may provide guidance for renewed efforts within the profession in the United States. PMID:25861098

  10. Engineering development of selective agglomeration: Task 5, Bench- scale process testing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-09-01

    Under the overall objectives of DOE Contract ``Engineering Development of Selective Agglomeration,`` there were a number of specific objectives in the Task 5 program. The prime objectives of Task 5 are highlighted below: (1) Maximize process performance in pyritic sulfur rejection and BTU recovery, (2) Produce a low ash product, (3) Compare the performance of the heavy agglomerant process based on diesel and the light agglomerant process using heptane, (4) Define optimum processing conditions for engineering design, (5) Provide first-level evaluation of product handleability, and (6) Explore and investigate process options/ideas which may enhance process performance and/or product handleability.

  11. Engineering development of selective agglomeration: Task 5, Bench- scale process testing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-09-01

    Under the overall objectives of DOE Contract Engineering Development of Selective Agglomeration,'' there were a number of specific objectives in the Task 5 program. The prime objectives of Task 5 are highlighted below: (1) Maximize process performance in pyritic sulfur rejection and BTU recovery, (2) Produce a low ash product, (3) Compare the performance of the heavy agglomerant process based on diesel and the light agglomerant process using heptane, (4) Define optimum processing conditions for engineering design, (5) Provide first-level evaluation of product handleability, and (6) Explore and investigate process options/ideas which may enhance process performance and/or product handleability.

  12. Independent calculation-based verification of IMRT plans using a 3D dose-calculation engine.

    PubMed

    Arumugam, Sankar; Xing, Aitang; Goozee, Gary; Holloway, Lois

    2013-01-01

    Independent monitor unit verification of intensity-modulated radiation therapy (IMRT) plans requires detailed 3-dimensional (3D) dose verification. The aim of this study was to investigate using a 3D dose engine in a second commercial treatment planning system (TPS) for this task, facilitated by in-house software. Our department has XiO and Pinnacle TPSs, both with IMRT planning capability and modeled for an Elekta-Synergy 6MV photon beam. These systems allow the transfer of computed tomography (CT) data and RT structures between them but do not allow IMRT plans to be transferred. To provide this connectivity, an in-house computer programme was developed to convert radiation therapy prescription (RTP) files as generated by many planning systems into either XiO or Pinnacle IMRT file formats. Utilization of the technique and software was assessed by transferring 14 IMRT plans from XiO and Pinnacle onto the other system and performing 3D dose verification. The accuracy of the conversion process was checked by comparing the 3D dose matrices and dose volume histograms (DVHs) of structures for the recalculated plan on the same system. The developed software successfully transferred IMRT plans generated by 1 planning system into the other. Comparison of planning target volume (TV) DVHs for the original and recalculated plans showed good agreement; a maximum difference of 2% in mean dose, - 2.5% in D95, and 2.9% in V95 was observed. Similarly, a DVH comparison of organs at risk showed a maximum difference of +7.7% between the original and recalculated plans for structures in both high- and medium-dose regions. However, for structures in low-dose regions (less than 15% of prescription dose) a difference in mean dose up to +21.1% was observed between XiO and Pinnacle calculations. A dose matrix comparison of original and recalculated plans in XiO and Pinnacle TPSs was performed using gamma analysis with 3%/3mm criteria. The mean and standard deviation of pixels passing gamma tolerance for XiO-generated IMRT plans was 96.1 ± 1.3, 96.6 ± 1.2, and 96.0 ± 1.5 in axial, coronal, and sagittal planes respectively. Corresponding results for Pinnacle-generated IMRT plans were 97.1 ± 1.5, 96.4 ± 1.2, and 96.5 ± 1.3 in axial, coronal, and sagittal planes respectively. © 2013 American Association of Medical Dosimetrists.

  13. Biomedical applications engineering tasks

    NASA Technical Reports Server (NTRS)

    Laenger, C. J., Sr.

    1976-01-01

    The engineering tasks performed in response to needs articulated by clinicians are described. Initial contacts were made with these clinician-technology requestors by the Southwest Research Institute NASA Biomedical Applications Team. The basic purpose of the program was to effectively transfer aerospace technology into functional hardware to solve real biomedical problems.

  14. System design of the Pioneer Venus spacecraft. Volume 14: Test planning trades

    NASA Technical Reports Server (NTRS)

    Pedretti, C. D.

    1973-01-01

    Pioneer Venus system test plans and trade studies which were first published as Study Tasks (References 1 through 5) are reviewed. The plan and trade studies are presented in a condensed form. Greater detail may be found in the referenced study tasks if desired. All significant conclusions and plan outlines of the original studies are, presented.

  15. Typical and Atypical (Cerebral Palsy) Development of Unimanual and Bimanual Grasp Planning

    ERIC Educational Resources Information Center

    Janssen, Loes; Steenbergen, Bert

    2011-01-01

    In the present study we tested 13 children with cerebral palsy (CP) and 24 typically developing children (7-12 years old) in a unimanual and bimanual motor planning task. We focused on two research questions: (1) How does motor planning develop in children with and without CP? and (2) Is motor planning facilitated when the task is performed with…

  16. The Keller Plan: A Successful Experiment in Engineering Education.

    ERIC Educational Resources Information Center

    Koen, Billy; And Others

    1985-01-01

    Discusses the Keller Plan or personalized system of instruction (PSI), a mastery-oriented, self-paced, modular teaching strategy using student/peer proctors. Success for PSI in chemical engineering, operations research, electrical engineering, and nuclear engineering courses is explained. (DH)

  17. IDC Integrated Master Plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clifford, David J.; Harris, James M.

    2014-12-01

    This is the IDC Re-Engineering Phase 2 project Integrated Master Plan (IMP). The IMP presents the major accomplishments planned over time to re-engineer the IDC system. The IMP and the associate Integrated Master Schedule (IMS) are used for planning, scheduling, executing, and tracking the project technical work efforts. REVISIONS Version Date Author/Team Revision Description Authorized by V1.0 12/2014 IDC Re- engineering Project Team Initial delivery M. Harris

  18. Autonomous Sensorweb Operations for Integrated Space, In-Situ Monitoring of Volcanic Activity

    NASA Technical Reports Server (NTRS)

    Chien, Steve A.; Doubleday, Joshua; Kedar, Sharon; Davies, Ashley G.; Lahusen, Richard; Song, Wenzhan; Shirazi, Behrooz; Mandl, Daniel; Frye, Stuart

    2010-01-01

    We have deployed and demonstrated operations of an integrated space in-situ sensorweb for monitoring volcanic activity. This sensorweb includes a network of ground sensors deployed to the Mount Saint Helens volcano as well as the Earth Observing One spacecraft. The ground operations and space operations are interlinked in that ground-based intelligent event detections can cause the space segment to acquire additional data via observation requests and space-based data acquisitions (thermal imagery) can trigger reconfigurations of the ground network to allocate increased bandwidth to areas of the network best situated to observe the activity. The space-based operations are enabled by an automated mission planning and tasking capability which utilizes several Opengeospatial Consortium (OGC) Sensorweb Enablement (SWE) standards which enable acquiring data, alerts, and tasking using web services. The ground-based segment also supports similar protocols to enable seamless tasking and data delivery. The space-based segment also supports onboard development of data products (thermal summary images indicating areas of activity, quicklook context images, and thermal activity alerts). These onboard developed products have reduced data volume (compared to the complete images) which enables them to be transmitted to the ground more rapidly in engineering channels.

  19. Task 4 supporting technology. Densification requirements definition and test objectives. Propellant densification requirements definition

    NASA Technical Reports Server (NTRS)

    Lak, Tibor; Weeks, D. P.

    1995-01-01

    The primary challenge of the X-33 CAN is to build and test a prototype LO2 and LH2 densification ground support equipment (GSE) unit, and perform tank thermodynamic testing within the 15 month phase 1 period. The LO2 and LH2 propellant densification system will be scaled for the IPTD LO2 and LH2 tank configurations. The IPTD tanks were selected for the propellant technology demonstration because of the potential benefits to the phase 1 plan: tanks will be built in time to support thermodynamic testing; minimum cost; minimum schedule risk; future testing at MSFC will build on phase 1 data base; and densification system will be available to support X-33 and RLV engine test at IPTD. The objective of the task 1 effort is to define the preliminary requirements of the propellant densification GSE and tank recirculation system. The key densification system design parameters to be established in Task 1 are: recirculation flow rate; heat exchanger inlet temperature; heat exchanger outlet temperature; maximum heat rejection rate; vent flow rate (GN2 and GH2); densification time; and tank pressure level.

  20. Elimination of High-Frequency Combustion Instability in the Fastrac Engine Thrust Chamber

    NASA Technical Reports Server (NTRS)

    Rocker, Marvin; Nesman, Thomas E.

    1998-01-01

    NASA's Marshall Space Flight Center(MSFC) has been tasked with developing a 60,000 pound thrust, pump-fed, LOX/RP-1 engine under the Advanced Space Transportation Program(ASTP). This government-led design has been designated the Fastrac engine. The X-34 vehicle will use the Fastrac engine as the main propulsion system. The X-34 will be a suborbital vehicle developed by the Orbital Sciences Corporation. The X-34 vehicle will be launched from an L-1011 airliner. After launch, the X-34 vehicle will be able to climb to altitudes up to 250,000 feet and reach speeds up to Mach 8, over a mission range of 500 miles. The overall length, wingspan, and gross takeoff weight of the X-34 vehicle are 58.3 feet, 27.7 feet and 45,000 pounds, respectively. This report summarizes the plan of achieving a Fastrac thrust chamber assembly(TCA) stable bomb test that meets the JANNAF standards, the Fastrac TCA design, and the combustion instabilities exhibited by the Fastrac TCA during testing at MSFC's test stand 116 as determined from high-frequency fluctuating pressure measurements. This report also summarizes the characterization of the combustion instabilities from the pressure measurements and the steps taken to eliminate the instabilities.

  1. High-Pressure Turbulent Flame Speeds and Chemical Kinetics of Syngas Blends with and without Impurities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Petersen, Eric; Mathieu, Olivier; Morones, Anibal

    This Final Report documents the entire four years of the project, from October 1, 2013 through September 30, 2017. This project was concerned with the chemical kinetics of fuel blends with high-hydrogen content in the presence of impurities. Emphasis was also on the design and construction of a new, high-pressure turbulent flame speed facility and the use of ignition delay times and flame speeds to elucidate the diluent and impurity effects on the fuel chemistry at gas turbine engine conditions and to also validate the chemical kinetics models. The project was divided into five primary tasks: 1) Project Management andmore » Program Planning; 2) Turbulent Flame Speed Measurements at Atmospheric Pressure; 3) Experiments and Kinetics of Syngas Blends with Impurities; 4) Design and Construction of a High-Pressure Turbulent Flame Speed Facility; and 5) High-Pressure Turbulent Flame Speed Measurements. Details on the execution and results of each of these tasks are provided in the main report.« less

  2. Goal-directed or aimless? EEG differences during the preparation of a reach-and-touch task.

    PubMed

    Pereira, Joana; Ofner, Patrick; Muller-Putz, Gernot R

    2015-08-01

    The natural control of neuroprostheses is currently a challenge in both rehabilitation engineering and brain-computer interfaces (BCIs) research. One of the recurrent problems is to know exactly when to activate such devices. For the execution of the most common activities of daily living, these devices only need to be active when in the presence of a goal. Therefore, we believe that the distinction between the planning of goal-directed and aimless movements, using non-invasive recordings, can be useful for the implementation of a simple and effective activation method for these devices. We investigated whether those differences are detectable during a reach-and-touch task, using electroencephalography (EEG). Event-related potentials and oscillatory activity changes were studied. Our results show that there are statistically significant differences between both types of movement. Combining this information with movement decoding would allow a natural control strategy for BCIs, exclusively relying on the cognitive processes behind movement preparation and execution.

  3. 40 CFR 270.18 - Specific part B information requirements for waste piles.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... complied with or detailed plans and an engineering report describing how the requirements of § 264.90(b)(2) will be met. (c) Detailed plans and an engineering report describing how the waste pile is designed and...(b) of this chapter, submit detailed plans, and engineering and hydrogeological reports, as...

  4. 40 CFR 270.18 - Specific part B information requirements for waste piles.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... complied with or detailed plans and an engineering report describing how the requirements of § 264.90(b)(2) will be met. (c) Detailed plans and an engineering report describing how the waste pile is designed and...(b) of this chapter, submit detailed plans, and engineering and hydrogeological reports, as...

  5. 78 FR 76383 - Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-17

    ...: LGA runways 4 and 31 runway safety area planning, environmental, and engineering. Brief Description of... Collection at EWR and Use at JFK at a $3.00 PFC Level: JFK taxiway P rehabilitation planning and engineering... delay reduction phase II--planning and engineering. Brief Description of Project Approved for Collection...

  6. 40 CFR 1068.510 - How do I prepare and apply my remedial plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) AIR POLLUTION CONTROLS GENERAL COMPLIANCE PROVISIONS FOR ENGINE PROGRAMS Reporting Defects and Recalling Engines/Equipment § 1068.510 How do I prepare and apply my remedial plan? (a) In your remedial plan, describe all of the following: (1) The class or category of engines/equipment to be recalled...

  7. Flow of a Gas Turbine Engine Low-Pressure Subsystem Simulated

    NASA Technical Reports Server (NTRS)

    Veres, Joseph P.

    1997-01-01

    The NASA Lewis Research Center is managing a task to numerically simulate overnight, on a parallel computing testbed, the aerodynamic flow in the complete low-pressure subsystem (LPS) of a gas turbine engine. The model solves the three-dimensional Navier- Stokes flow equations through all the components within the LPS, as well as the external flow around the engine nacelle. The LPS modeling task is being performed by Allison Engine Company under the Small Engine Technology contract. The large computer simulation was evaluated on networked computer systems using 8, 16, and 32 processors, with the parallel computing efficiency reaching 75 percent when 16 processors were used.

  8. Using a Didactic Manipulator in Mechatronics and Industrial Engineering Courses

    ERIC Educational Resources Information Center

    Stankovski, Stevan; Tarjan, Laslo; Skrinjar, Dragana; Ostojic, Gordana; Senk, Ivana

    2010-01-01

    One of the most difficult and most important engineering tasks is the integration of a robot-manipulator into material handling, assembly, and production processes, offering the possibility of supervision and control. The knowledge and skills required for these kinds of tasks are purely mechatronic and, thus, multidisciplinary. This paper…

  9. MO-F-CAMPUS-T-05: SQL Database Queries to Determine Treatment Planning Resource Usage

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fox, C; Gladstone, D

    2015-06-15

    Purpose: A radiation oncology clinic’s treatment capacity is traditionally thought to be limited by the number of machines in the clinic. As the number of fractions per course decrease and the number of adaptive plans increase, the question of how many treatment plans a clinic can plan becomes increasingly important. This work seeks to lay the ground work for assessing treatment planning resource usage. Methods: Care path templates were created using the Aria 11 care path interface. Care path tasks included key steps in the treatment planning process from the completion of CT simulation through the first radiation treatment. SQLmore » Server Management Studio was used to run SQL queries to extract task completion time stamps along with care path template information and diagnosis codes from the Aria database. 6 months of planning cycles were evaluated. Elapsed time was evaluated in terms of work hours within Monday – Friday, 7am to 5pm. Results: For the 195 validated treatment planning cycles, the average time for planning and MD review was 22.8 hours. Of those cases 33 were categorized as urgent. The average planning time for urgent plans was 5 hours. A strong correlation between diagnosis code and range of elapsed planning time was as well as between elapsed time and select diagnosis codes was observed. It was also observed that tasks were more likely to be completed on the date due than the time that they were due. Follow-up confirmed that most users did not look at the due time. Conclusion: Evaluation of elapsed planning time and other tasks suggest that care paths should be adjusted to allow for different contouring and planning times for certain diagnosis codes and urgent cases. Additional clinic training around task due times vs dates or a structuring of care paths around due dates is also needed.« less

  10. This photocopy of an engineering drawing shows the floor plan ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    This photocopy of an engineering drawing shows the floor plan of the Liner Lab, including room functions. Austin, Field & Fry, Architects Engineers, 22311 West Third Street, Los Angeles 57, California: Edwards Test Station Complex Phase II, Jet Propulsion Laboratory, California Institute of Technology, Edwards Air Force Base, Edwards, California: "Liner Laboratory, Floor Plan and Schedules," drawing no. E33/4-2, 26 June 1962. California Institute of Technology, Jet Propulsion Laboratory, Plant Engineering: engineering drawings of structures at JPL Edwards Facility. Drawings on file at JPL Plant Engineering, Pasadena, California. California Institute of Technology, Jet Propulsion Laboratory, Plant Engineering: engineering drawings of structures at JPL Edwards Facility. Drawings on file at JPL Plant Engineering, Pasadena, California - Jet Propulsion Laboratory Edwards Facility, Liner Laboratory, Edwards Air Force Base, Boron, Kern County, CA

  11. Monitored execution of robot plans produced by STRIPS.

    NASA Technical Reports Server (NTRS)

    Fikes, R. E.

    1972-01-01

    We describe PLANEX1, a plan executor for the Stanford Research Institute robot system. The problem-solving program STRIPS creates a plan consisting of a sequence of actions, and PLANEX1 program carries out the plan by executing the actions. PLANEX1 is designed so that it executes only that portion of the plan necessary for completing the task, reexecutes any portion of the plan that has failed to achieve the desired results, and initiates replanning in situations where the plan can no longer be effective in completing the task. The scenario for an example plan execution is given.

  12. Joint Knowledge Generation Between Climate Science and Infrastructure Engineering

    NASA Astrophysics Data System (ADS)

    Stoner, A. M. K.; Hayhoe, K.; Jacobs, J. M.

    2015-12-01

    Over the past decade the engineering community has become increasingly aware of the need to incorporate climate projections into the planning and design of sensitive infrastructure. However, this is a task that is easier said than done. This presentation will discuss some of the successes and hurdles experiences through the past year, from a climate scientist's perspective, working with engineers in infrastructure research and applied engineering through the Infrastructure & Climate Network (ICNet). Engineers rely on strict building codes and ordinances, and can be the subject of lawsuits if those codes are not followed. Matters are further complicated by the uncertainty inherent to climate projections, which include short-term natural variability, as well as the influence of scientific uncertainty and even human behavior on the rate and magnitude of change. Climate scientists typically address uncertainty by creating projections based on multiple models following different future scenarios. This uncertainty is difficult to incorporate into engineering projects, however, due to the fact that they cannot build two different bridges, one allowing for a lower amount of change, and another for a higher. More often than not there is a considerable difference between the costs of building two such bridges, which means that available funds often are the deciding factor. Discussions of climate science are often well received with engineers who work in the research area of infrastructure; going a step further, however, and implementing it in applied engineering projects can be challenging. This presentation will discuss some of the challenges and opportunities inherent to collaborations between climate scientists and transportation engineers, drawing from a range of studies including truck weight restrictions on roads during the spring thaw, and bridge deck performance due to environmental forcings.

  13. Problems Related to the Siting of the Laboratory Building for Civil Engineering Department at the University of Warmia and Mazury in Olsztyn, Poland

    NASA Astrophysics Data System (ADS)

    Zagroba, Marek

    2016-10-01

    This paper deals with the conditions underlying and the problems arising from the siting of a building with specialist laboratories in a developed part of the university campus in Olsztyn, Poland. The topography of the terrain and the need to house civil engineering laboratories in the planned building had an immense impact on the shape of the building and consequently on its foundations, whose dimensions responded to the ground conditions and the specification of various loads they would have to support, including the equipment for the laboratories. The siting of a building as a step in the construction process entails several problems, which are first taken into consideration at the stage of making preliminary concept plans and are subsequently verified while working on the final construction plan. The required information included geotechnical documentation, survey of the ground conditions and the data regarding the predicted loads on the building, necessary to select the right type of foundations. All these problems grow in importance when dealing with such unique buildings like the discussed example of a laboratory building for the Civil Engineering Department, built on a site within a conservation zone on the campus of the University of Warmia and Mazury in Olsztyn, Poland. The specific character of the building and the specialist equipment with which it was to be furnished (a resistance testing machine, a 17-meter-long wave flume) necessitated a series of analyses prior to the siting of the building and selecting suitable foundations. In turn, the fact that the new building was to be erected in the conservation zone meant that collaboration with the Heritage Conservation Office had to be undertaken at the stage of making the plan and continued during the construction works. The Heritage Officer's recommendations concerning the building's shape, divisions, dimensions, materials used, etc., created a situation where the team of designers and architects had to become engaged in the process of landscape and spatial management. The above requirements concerned the functions of the building and its siting on a land parcel that was difficult to handle, also because of the protected trees growing there. Other constraints included the small size of this site, the developed surroundings, and the pre-defined programme of functions and use of the new building. On the other hand, the siting of the planned building had to be accommodated to the existing underground infrastructure (utilities). All the above circumstances made the task difficult and demanded good coordination between individual teams of engineers and architects, both at the stage of making the plan and during the construction works.

  14. Anticipatory Action Planning Increases from 3 to 10 Years of Age in Typically Developing Children

    ERIC Educational Resources Information Center

    Jongbloed-Pereboom, Marjolein; Nijhuis-van der Sanden, Maria W. G.; Saraber-Schiphorst, Nicole; Craje, Celine; Steenbergen, Bert

    2013-01-01

    The primary aim of this study was to assess the development of action planning in a group of typically developing children aged 3 to 10 years (N = 351). The second aim was to assess reliability of the action planning task and to relate the results of the action planning task to results of validated upper limb motor performance tests. Participants…

  15. Definition study for variable cycle engine testbed engine and associated test program

    NASA Technical Reports Server (NTRS)

    Vdoviak, J. W.

    1978-01-01

    The product/study double bypass variable cycle engine (VCE) was updated to incorporate recent improvements. The effect of these improvements on mission range and noise levels was determined. This engine design was then compared with current existing high-technology core engines in order to define a subscale testbed configuration that simulated many of the critical technology features of the product/study VCE. Detailed preliminary program plans were then developed for the design, fabrication, and static test of the selected testbed engine configuration. These plans included estimated costs and schedules for the detail design, fabrication and test of the testbed engine and the definition of a test program, test plan, schedule, instrumentation, and test stand requirements.

  16. F-16 Task Analysis Criterion-Referenced Objective and Objectives Hierarchy Report. Volume 4

    DTIC Science & Technology

    1981-03-01

    Initiation cues: Engine flameout Systems presenting cues: Aircraft fuel, engine STANDARD: Authority: TACR 60-2 Performance precision: TD in first 1/3 of...task: None Initiation cues: On short final Systems preventing cues: N/A STANDARD: Authority: 60-2 Performance precision: +/- .5 AOA; TD zone 150-1000...precision: +/- .05 AOA; TD Zone 150-1000 Computational accuracy: N/A ... . . ... . ... e e m I TASK NO.: 1.9.4 BEHAVIOR: Perform short field landing

  17. Eye movements show similar adaptations in temporal coordination to movement planning conditions in both people with and without cerebral palsy.

    PubMed

    Payne, Alexander R; Plimmer, Beryl; McDaid, Andrew; Davies, T Claire

    2017-05-01

    The effects of cerebral palsy on movement planning for simple reaching tasks are not well understood. Movement planning is complex and entails many processes which could be affected. This study specifically sought to evaluate integrating task information, decoupling movements, and adjusting to altered mapping. For a reaching task, the asynchrony between the eye onset and the hand onset was measured across different movement planning conditions for participants with and without cerebral palsy. Previous research shows people without cerebral palsy vary this temporal coordination for different planning conditions. Our measurements show similar adaptations in temporal coordination for groups with and without cerebral palsy, to three of the four variations in planning condition tested. However, movement durations were still longer for the participants with cerebral palsy. Hence for simple goal-directed reaching, movement execution problems appear to limit activity more than movement planning deficits.

  18. ENGINEERED BARRIER SYSTEM: PHYSICAL AND CHEMICAL ENVIRONMENT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    R. Jarek

    2005-08-29

    The purpose of this model report is to describe the evolution of the physical and chemical environmental conditions within the waste emplacement drifts of the repository, including the drip shield and waste package surfaces. The resulting seepage evaporation and gas abstraction models are used in the total system performance assessment for the license application (TSPA-LA) to assess the performance of the engineered barrier system and the waste form. This report develops and documents a set of abstraction-level models that describe the engineered barrier system physical and chemical environment. Where possible, these models use information directly from other reports as input,more » which promotes integration among process models used for TSPA-LA. Specific tasks and activities of modeling the physical and chemical environment are included in ''Technical Work Plan for: Near-Field Environment and Transport In-Drift Geochemistry Model Report Integration'' (BSC 2005 [DIRS 173782], Section 1.2.2). As described in the technical work plan, the development of this report is coordinated with the development of other engineered barrier system reports. To be consistent with other project documents that address features, events, and processes (FEPs), Table 6.14.1 of the current report includes updates to FEP numbers and FEP subjects for two FEPs identified in the technical work plan (TWP) governing this report (BSC 2005 [DIRS 173782]). FEP 2.1.09.06.0A (Reduction-oxidation potential in EBS), as listed in Table 2 of the TWP (BSC 2005 [DIRS 173782]), has been updated in the current report to FEP 2.1.09.06.0B (Reduction-oxidation potential in Drifts; see Table 6.14-1). FEP 2.1.09.07.0A (Reaction kinetics in EBS), as listed in Table 2 of the TWP (BSC 2005 [DIRS 173782]), has been updated in the current report to FEP 2.1.09.07.0B (Reaction kinetics in Drifts; see Table 6.14-1). These deviations from the TWP are justified because they improve integration with FEPs documents. The updates have no impact on the model developed in this report.« less

  19. MODELING CST ION EXCHANGE FOR CESIUM REMOVAL FROM SCIX BATCHES 1 - 4

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith, F.

    2011-04-25

    The objective of this work is, through modeling, to predict the performance of Crystalline Silicotitinate (CST) for the removal of cesium from Small Column Ion Exchange (SCIX) Batches 1-4 (as proposed in Revision 16 of the Liquid Waste System Plan). The scope of this task is specified in Technical Task Request (TTR) 'SCIX Feed Modeling', HLE-TTR-2011-003, which specified using the Zheng, Anthony, Miller (ZAM) code to predict CST isotherms for six given SCIX feed compositions and the VErsatile Reaction and SEparation simulator for Liquid Chromatography (VERSE-LC) code to predict ion-exchange column behavior. The six SCIX feed compositions provided in themore » TTR represent SCIX Batches 1-4 and Batches 1 and 2 without caustic addition. The study also investigated the sensitivity in column performance to: (1) Flow rates of 5, 10, and 20 gpm with 10 gpm as the nominal flow; and (2) Temperatures of 25, 35, and 45 C with 35 C as the nominal temperature. The isotherms and column predictions presented in this report reflect the expected performance of engineered CST IE-911. This form of CST was used in experiments conducted at the Savannah River National Laboratory (SRNL) that formed the basis for estimating model parameters (Hamm et al., 2002). As has been done previously, the engineered resin capacity is estimated to be 68% of the capacity of particulate CST without binder.« less

  20. How to write a research proposal?

    PubMed Central

    Sudheesh, K; Duggappa, Devika Rani; Nethra, SS

    2016-01-01

    Writing the proposal of a research work in the present era is a challenging task due to the constantly evolving trends in the qualitative research design and the need to incorporate medical advances into the methodology. The proposal is a detailed plan or ‘blueprint’ for the intended study, and once it is completed, the research project should flow smoothly. Even today, many of the proposals at post-graduate evaluation committees and application proposals for funding are substandard. A search was conducted with keywords such as research proposal, writing proposal and qualitative using search engines, namely, PubMed and Google Scholar, and an attempt has been made to provide broad guidelines for writing a scientifically appropriate research proposal. PMID:27729688

  1. Effects of metric change on safety in the workplace for selected occupations

    NASA Astrophysics Data System (ADS)

    Lefande, J. M.; Pokorney, J. L.

    1982-04-01

    The study assesses the potential safety issues of metric conversion in the workplace. A purposive sample of 35 occupations based on injury and illnesses indexes were assessed. After an analysis of workforce population, hazard analysis and measurement sensitivity of the occupations, jobs were analyzed to identify potential safety hazards by industrial hygienists, safety engineers and academia. The study's major findings were as follows: No metric hazard experience was identified. An increased exposure might occur when particular jobs and their job tasks are going the transition from customary measurement to metric measurement. Well planned metric change programs reduce hazard potential. Metric safety issues are unresolved in the aviation industry.

  2. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rosenthal, A

    Southwest Technology Development Institute (SWTDI), an independent, university-based research institute, has been the operator of the Southwest Region Photovoltaic Experiment Station (SWRES) for almost 30 years. The overarching mission of SWTDI is to position PV systems and solar technologies to become cost-effective, major sources of energy for the United States. Embedded in SWTDI's general mission has been the more-focused mission of the SWRES: to provide value added technical support to the DOE Solar Energy Technologies Program (SETP) to effectively and efficiently meet the R&D needs and targets specified in the SETP Multi-Year Technical Plan. : The DOE/SETP goals of growingmore » U.S. PV manufacturing into giga-watt capacities and seeing tera-watt-hours of solar energy production in the U.S. require an infrastructure that is under development. The staff of the SWRES has supported DOE/SETP through a coherent, integrated program to address infrastructural needs inhibiting wide-scale PV deployment in three major technical categories: specialized engineering services, workforce development, and deployment facilitation. The SWRES contract underwent three major revisions during its five year period-of- performance, but all tasks and deliverables fell within the following task areas: Task 1: PV Systems Assistance Center 1. Develop a Comprehensive multi-year plan 2. Provide technical workforce development materials and workshops for PV stakeholder groups including university, professional installers, inspectors, state energy offices, Federal agencies 3. Serve on the NABCEP exam committee 4. Provide on-demand technical PV system design reviews for U.S. PV stakeholders 5. Provide PV system field testing and instrumentation, technical outreach (including extensive support for the DOE Market Transformation program) Task 2: Design-for-Manufacture PV Systems 1. Develop and install 18 kW parking carport (cost share) and PV-thermal carport (Albuquerque) deriving and publishing lessons learned Task 3: PV Codes and Standards 1. Serve as the national lead for development and preparation of all proposals (related to PV) to the National Electrical Code 2. Participate in the Standards Technical Panels for modules (UL1703) and inverters (UL1741) Task 4: Assess Inverter Long Term Reliability 1. Install and monitor identical inverters at SWRES and SERES 2. Operate and monitor all inverters for 5 years, characterizing all failures and performance trends Task 5: Test and Evaluation Support for Solar America Initiative 1. Provide test and evaluation services to the National Laboratories for stage gate and progress measurements of SAI TPP winners« less

  3. Preschool children adapt grasping movements to upcoming object manipulations: Evidence from a dial rotation task.

    PubMed

    Herbort, Oliver; Büschelberger, Juliane; Janczyk, Markus

    2018-03-01

    In adults, the motor plans for object-directed grasping movements reflects the anticipated requirements of intended future object manipulations. This prospective mode of planning has been termed second-order planning. Surprisingly, second-order planning is thought to be fully developed only by 10 years of age, when children master seemingly more complex motor skills. In this study, we tested the hypothesis that already 5- and 6-year-old children consistently use second-order planning but that this ability does not become apparent in tasks that are traditionally used to probe it. We asked 5- and 6-year-olds and adults to grasp and rotate a circular dial in a clockwise or counterclockwise direction. Although children's grasp selections were less consistent on an intra- and inter-individual level than adults' grasp selections, all children adjusted their grasps to the upcoming dial rotations. By contrast, in an also administered bar rotation task, only a subset of children adjusted their grasps to different bar rotations, thereby replicating previous results. The results indicate that 5- and 6-year-olds consistently use second-order planning in a dial rotation task, although this ability does not become apparent in bar rotation tasks. Copyright © 2017 Elsevier Inc. All rights reserved.

  4. Noise disturbance in open-plan study environments: a field study on noise sources, student tasks and room acoustic parameters.

    PubMed

    Braat-Eggen, P Ella; van Heijst, Anne; Hornikx, Maarten; Kohlrausch, Armin

    2017-09-01

    The aim of this study is to gain more insight in the assessment of noise in open-plan study environments and to reveal correlations between noise disturbance experienced by students and the noise sources they perceive, the tasks they perform and the acoustic parameters of the open-plan study environment they work in. Data were collected in five open-plan study environments at universities in the Netherlands. A questionnaire was used to investigate student tasks, perceived sound sources and their perceived disturbance, and sound measurements were performed to determine the room acoustic parameters. This study shows that 38% of the surveyed students are disturbed by background noise in an open-plan study environment. Students are mostly disturbed by speech when performing complex cognitive tasks like studying for an exam, reading and writing. Significant but weak correlations were found between the room acoustic parameters and noise disturbance of students. Practitioner Summary: A field study was conducted to gain more insight in the assessment of noise in open-plan study environments at universities in the Netherlands. More than one third of the students was disturbed by noise. An interaction effect was found for task type, source type and room acoustic parameters.

  5. Geometric reasoning

    NASA Technical Reports Server (NTRS)

    Woodbury, R. F.; Oppenheim, I. J.

    1987-01-01

    Cognitive robot systems are ones in which sensing and representation occur, from which task plans and tactics are determined. Such a robot system accomplishes a task after being told what to do, but determines for itself how to do it. Cognition is required when the work environment is uncontrolled, when contingencies are prevalent, or when task complexity is large; it is useful in any robotic mission. A number of distinguishing features can be associated with cognitive robotics, and one emphasized here is the role of artificial intelligence in knowledge representation and in planning. While space telerobotics may elude some of the problems driving cognitive robotics, it shares many of the same demands, and it can be assumed that capabilities developed for cognitive robotics can be employed advantageously for telerobotics in general. The top level problem is task planning, and it is appropriate to introduce a hierarchical view of control. Presented with certain mission objectives, the system must generate plans (typically) at the strategic, tactical, and reflexive levels. The structure by which knowledge is used to construct and update these plans endows the system with its cognitive attributes, and with the ability to deal with contingencies, changes, unknowns, and so on. Issues of representation and reasoning which are absolutely fundamental to robot manipulation, decisions based upon geometry, are discussed here, not AI task planning per se.

  6. Facility Upgrade/Replacement Tasks ('planned') at the NASA Glenn Research Center 10x10 Supersonic Wind Tunnel

    NASA Technical Reports Server (NTRS)

    Giriunas, Julius A.

    2012-01-01

    Facility upgrades and large maintenance tasks needed at the NASA Glenn 10x10 Supersonic Wind Tunnel requires significant planning to make sure implementation proceeds in an efficiently and cost effective manner. Advanced planning to secure the funding, complete design efforts and schedule the installation needs to be thought out years in advance to avoid interference with wind tunnel testing. This presentation describes five facility tasks planned for implementation over the next few years. The main focus of the presentation highlights the efforts on possible replacement of the diesel generator and the rationale behind the effort.

  7. Movement planning reflects skill level and age changes in toddlers

    PubMed Central

    Chen, Yu-ping; Keen, Rachel; Rosander, Kerstin; von Hofsten, Claes

    2010-01-01

    Kinematic measures of children’s reaching were found to reflect stable differences in skill level for planning for future actions. Thirty-five toddlers (18–21 months) were engaged in building block towers (precise task) and in placing blocks into an open container (imprecise task). Sixteen children were re-tested on the same tasks a year later. Longer deceleration as the hand approached the block for pickup was found in the tower task compared to the imprecise task, indicating planning for the second movement. More skillful toddlers who could build high towers had a longer deceleration phase when placing blocks on the tower than toddlers who built low towers. Kinematic differences between the groups remained a year later when all children could build high towers. PMID:21077868

  8. PLANS & ELEVATIONS. United Engineering Company Ltd., Alameda Shipyard. Also ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PLANS & ELEVATIONS. United Engineering Company Ltd., Alameda Shipyard. Also includes door schedule and a small scale plot plan. No architect noted. Drawn by W.H.H. Plan no. 2-N-5 (U.E. Co. plan no. 10,523). Scale 1/8 inch to the foot. March 10, 1942, last revised 10/6/43. U.S. Navy, Bureau of Yards & Docks, Contract no. bs 76, item no. 22A. Approved for construction October 9, 1943. blueprint - United Engineering Company Shipyard, Warehouse, 2900 Main Street, Alameda, Alameda County, CA

  9. SECOND FLOOR AND ROOF PLANS. United Engineering Company Ltd., Alameda ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    SECOND FLOOR AND ROOF PLANS. United Engineering Company Ltd., Alameda Shipyard, Ship Repair Facilities, Office Building. Second floor plan, and roof plan. John Hudspeth, Architect, at foot of Main Street, Alameda, Calif. Sheet no. A2 of 8 sheets, Plan no. 10,007. Scale 1/8 inch to the foot. March 18, 1942, last revised 9/22/43. U.S. Navy, Bureau of Yards & Docks, Contract no. bs 76. Approved for construction October 9, 1943. blueprint - United Engineering Company Shipyard, Office Building No. 137, 2900 Main Street, Alameda, Alameda County, CA

  10. This photographic copy of an engineering drawing shows floor plans, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    This photographic copy of an engineering drawing shows floor plans, sections and elevations of Building E-86, with details typical of the steel frame and "Transite" building construction at JPL Edwards Facility. California Institute of Technology, Jet Propulsion Laboratory, Facilities Engineering and Construction Office: "Casting & Curing, Building E-86, Floor Plan, Elevations & Section," drawing no. E86/6, 25 February 1977. California Institute of Technology, Jet Propulsion Laboratory, Plant Engineering: engineering drawings of structures at JPL Edwards Facility. Drawings on file at JPL Plant Engineering, Pasadena, California - Jet Propulsion Laboratory Edwards Facility, Casting & Curing Building, Edwards Air Force Base, Boron, Kern County, CA

  11. The Theory of Planned Behaviour Applied to Search Engines as a Learning Tool

    ERIC Educational Resources Information Center

    Liaw, Shu-Sheng

    2004-01-01

    Search engines have been developed for helping learners to seek online information. Based on theory of planned behaviour approach, this research intends to investigate the behaviour of using search engines as a learning tool. After factor analysis, the results suggest that perceived satisfaction of search engine, search engines as an information…

  12. A Working Plan for Treating the Engineering Faculty Shortage Problem.

    ERIC Educational Resources Information Center

    Shoup, Terry E., Ed.

    In view of the consequences of the engineering faculty shortage problem on engineering capabilities in the future in the United States, a working plan which will serve as a national agenda for prompt action has been developed. This plan involves the three key groups (federal government, academic community, industry) who have the vision,…

  13. The Impact of Federal Programs and Policies on Manpower Planning for Scientists and Engineers: Problems and Progress.

    ERIC Educational Resources Information Center

    Scientific Manpower Commission, Washington, DC.

    This document reports the results of a workshop held to assess the impact of federal programs and legislation on manpower planning for scientists and engineers. Included are presentations relating to manpower utilization and planning via federal government agencies and professional societies for scientists and engineers. It was concluded that the…

  14. Study of solid rocket motor for space shuttle booster, Volume 3: Program acquisition planning

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The program planning acquisition functions for the development of the solid propellant rocket engine for the space shuttle booster is presented. The subjects discussed are: (1) program management, (2) contracts administration, (3) systems engineering, (4) configuration management, and (5) maintenance engineering. The plans for manufacturing, testing, and operations support are included.

  15. Energy efficient engine high pressure turbine ceramic shroud support technology report

    NASA Technical Reports Server (NTRS)

    Nelson, W. A.; Carlson, R. G.

    1982-01-01

    This work represents the development and fabrication of ceramic HPT (high pressure turbine) shrouds for the Energy Efficient Engine (E3). Details are presented covering the work performed on the ceramic shroud development task of the NASA/GE Energy Efficient Engine (E3) component development program. The task consists of four phases which led to the selection of a ZrO2-BY2O3 ceramic shroud material system, the development of an automated plasma spray process to produce acceptable shroud structures, the fabrication of select shroud systems for evaluation in laboratory, component, and CF6-50 engine testing, and finally, the successful fabrication of ZrO2-8Y2O3/superpeg, engine quality shrouds for the E3 engine.

  16. The Effect of Pre-Task Planning Time on L2 Learners' Narrative Writing Performance

    ERIC Educational Resources Information Center

    Seyyedi, Keivan; Ismail, Shaik Abdul Malik Mohamed; Orang, Maryam; Nejad, Maryam Sharafi

    2013-01-01

    Building on Baddeley's cognitive psychology (2007) and Skehan's Limited Attentional Capacity Model (2009), this article reports a study of the effects of pre-task planning time (strategic planning time) on Malaysian English learners' written narratives elicited by means of a picture composition. 50 first-year undergraduate students studying at…

  17. Multidisciplinary optimization for engineering systems - Achievements and potential

    NASA Technical Reports Server (NTRS)

    Sobieszczanski-Sobieski, Jaroslaw

    1989-01-01

    The currently common sequential design process for engineering systems is likely to lead to suboptimal designs. Recently developed decomposition methods offer an alternative for coming closer to optimum by breaking the large task of system optimization into smaller, concurrently executed and, yet, coupled tasks, identified with engineering disciplines or subsystems. The hierarchic and non-hierarchic decompositions are discussed and illustrated by examples. An organization of a design process centered on the non-hierarchic decomposition is proposed.

  18. Human Engineering Modeling and Performance Lab Study Project

    NASA Technical Reports Server (NTRS)

    Oliva-Buisson, Yvette J.

    2014-01-01

    The HEMAP (Human Engineering Modeling and Performance) Lab is a joint effort between the Industrial and Human Engineering group and the KAVE (Kennedy Advanced Visualiations Environment) group. The lab consists of sixteen camera system that is used to capture human motions and operational tasks, through te use of a Velcro suit equipped with sensors, and then simulate these tasks in an ergonomic software package know as Jac, The Jack software is able to identify the potential risk hazards.

  19. Engineering and Design: Civil Works Cost Engineering

    DTIC Science & Technology

    1994-03-31

    labor cost requirements are broken into tasks of work. Each task is usually performd by a labor crew. Crews may vary in size and mix of skills. The...requested in advance of the expected purchase date. Suppliers are reluctant to guarantee future pricw and ofien will only quote current prices. It may be...unit cost is the overhead cost for the item. g. Sources for Pricing. The Cost Engineer must rely on judgement, historical data, and current labor market

  20. Multidisciplinary optimization for engineering systems: Achievements and potential

    NASA Technical Reports Server (NTRS)

    Sobieszczanski-Sobieski, Jaroslaw

    1989-01-01

    The currently common sequential design process for engineering systems is likely to lead to suboptimal designs. Recently developed decomposition methods offer an alternative for coming closer to optimum by breaking the large task of system optimization into smaller, concurrently executed and, yet, coupled tasks, identified with engineering disciplines or subsystems. The hierarchic and non-hierarchic decompositions are discussed and illustrated by examples. An organization of a design process centered on the non-hierarchic decomposition is proposed.

  1. Comparative analysis of operational forecasts versus actual weather conditions in airline flight planning, volume 2

    NASA Technical Reports Server (NTRS)

    Keitz, J. F.

    1982-01-01

    The impact of more timely and accurate weather data on airline flight planning with the emphasis on fuel savings is studied. This volume of the report discusses the results of Task 2 of the four major tasks included in the study. Task 2 compares various catagories of flight plans and flight tracking data produced by a simulation system developed for the Federal Aviation Administrations by SRI International. (Flight tracking data simulate actual flight tracks of all aircraft operating at a given time and provide for rerouting of flights as necessary to resolve traffic conflicts.) The comparisons of flight plans on the forecast to flight plans on the verifying analysis confirm Task 1 findings that wind speeds are generally underestimated. Comparisons involving flight tracking data indicate that actual fuel burn is always higher than planned, in either direction, and even when the same weather data set is used. Since the flight tracking model output results in more diversions than is known to be the case, it was concluded that there is an error in the flight tracking algorithm.

  2. Comparing two types of engineering visualizations: task-related manipulations matter.

    PubMed

    Cölln, Martin C; Kusch, Kerstin; Helmert, Jens R; Kohler, Petra; Velichkovsky, Boris M; Pannasch, Sebastian

    2012-01-01

    This study focuses on the comparison of traditional engineering drawings with a CAD (computer aided design) visualization in terms of user performance and eye movements in an applied context. Twenty-five students of mechanical engineering completed search tasks for measures in two distinct depictions of a car engine component (engineering drawing vs. CAD model). Besides spatial dimensionality, the display types most notably differed in terms of information layout, access and interaction options. The CAD visualization yielded better performance, if users directly manipulated the object, but was inferior, if employed in a conventional static manner, i.e. inspecting only predefined views. An additional eye movement analysis revealed longer fixation durations and a stronger increase of task-relevant fixations over time when interacting with the CAD visualization. This suggests a more focused extraction and filtering of information. We conclude that the three-dimensional CAD visualization can be advantageous if its ability to manipulate is used. Copyright © 2011 Elsevier Ltd and The Ergonomics Society. All rights reserved.

  3. 46 CFR 71.65-5 - Plans and specifications required for new construction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... dioxide, foam, and sprinkling systems. (7) Supervised Patrol Route. (e) Marine engineering. (1) For plans required for marine engineering equipment and systems, see subchapter F (Marine Engineering) of this... equipment and systems, see subchapter J (Electrical Engineering) of this chapter. (2) [Reserved] (g...

  4. Variations of cortisol, fatigue and sleep disturbances in sound engineers: effect of job task and fast backward-rotating shifts.

    PubMed

    Vangelova, Katia K

    2008-01-01

    The aim was to study the effect of job task and fast backward-rotating shifts on the time-of-day variations of cortisol, fatigue, and sleep disturbances in broadcasting sound engineers. The concentration of saliva cortisol and ratings of stress, sleepiness, and fatigue were followed at 3-hour intervals during the fast backward-rotating shifts in 26 sound engineers: 14 subjects from control rooms, aged 45.1 +/- 7.3 years, and 12 subjects working in direct transmissions, aged 51.7 +/- 6.0 years. Saliva cortisol was assessed using an radioimmunology kit. The participants reported for stress symptoms after the shifts and filled a sleep diary. The effects of job task, shift, and time-of-day were analyzed by tests of between-subjects effects (SPSS). Cortisol retained the typical diurnal pattern with a highly significant effect of the shift. The job task and the shift interacted significantly. Higher cortisol values during the morning and night shifts in engineers working in direct transmissions were found. Their stress ratings were also higher, as well as the ratings of sleepiness and fatigue. The quality of sleep was worse in engineers working in direct transmissions. In conclusion, our data indicate that stress and fast backward-rotating shifts in sound engineers working in direct transmissions affect physiological stress markers such as cortisol and increase sleepiness, fatigue, and sleep problems.

  5. Differences in Writers' Initial Task Representations. Technical Report No. 35.

    ERIC Educational Resources Information Center

    Carey, Linda; And Others

    An exploratory study investigated how writers represent their task to themselves before beginning to write. Using data from verbal protocols, the initial plans of 12 writers (5 experts and 7 student writers) who were working on an expository writing task were examined. The protocols were coded for types of planning. Independent measures of the…

  6. Major Events Leading to Establishment of The National Task Bank.

    ERIC Educational Resources Information Center

    Upjohn (W.E.) Inst. for Employment Research, Washington, DC.

    This document describes how the plan for a National Task Bank evolved as part of an effort to encourage State and local public welfare agencies to adopt new approaches to staff planning and utilization. The task bank is an outgrowth of the application of systems approach and functional job analysis to agency management. Individualized data banks…

  7. Movement Planning Reflects Skill Level and Age Changes in Toddlers

    ERIC Educational Resources Information Center

    Chen, Yu-ping; Keen, Rachel; Rosander, Kerstin; Von Hofsten, Claes

    2010-01-01

    Kinematic measures of children's reaching were found to reflect stable differences in skill level for planning for future actions. Thirty-five toddlers (18-21 months) were engaged in building block towers (precise task) and in placing blocks into an open container (imprecise task). Sixteen children were retested on the same tasks a year later.…

  8. The effect of curricular activities on learner autonomy: the perspective of undergraduate mechanical engineering students

    NASA Astrophysics Data System (ADS)

    Duarte, M.; Leite, C.; Mouraz, A.

    2016-01-01

    This study researches how first-year engineering students perceived the influence of curricular activities on their own learning autonomy, measured with an adaptation of the Personal Responsibility Orientation to Self-direction in Learning Scale (PRO-SDLS). Participants were questioned to assess the influence of the teacher's role. The results indicate that learners' characteristics (motivation and self-efficacy) contribute more to learner autonomy (LA) than the teaching-learning transaction (control and initiative), as in the original PRO-SDLS validation. The most autonomous learners presented higher values in all LA components and dimensions, but the differences were greater in motivation and initiative. The participants with higher LA were not as dependent on the teacher, regarding assessment, the completion of classroom tasks and deadlines. Regardless of the degree of autonomy in learning, all participants viewed teachers as the main source of information. Therefore, LA plays an important role in teaching activities planning. Suggestions for adjustments and more flexible learning scenarios are formulated.

  9. Making the EZ Choice

    NASA Technical Reports Server (NTRS)

    2001-01-01

    Analytical Mechanics Associates, Inc. (AMA), of Hampton, Virginia, created the EZopt software application through Small Business Innovation Research (SBIR) funding from NASA's Langley Research Center. The new software is a user-friendly tool kit that provides quick and logical solutions to complex optimal control problems. In its most basic form, EZopt converts process data into math equations and then proceeds to utilize those equations to solve problems within control systems. EZopt successfully proved its advantage when applied to short-term mission planning and onboard flight computer implementation. The technology has also solved multiple real-life engineering problems faced in numerous commercial operations. For instance, mechanical engineers use EZopt to solve control problems with robots, while chemical plants implement the application to overcome situations with batch reactors and temperature control. In the emerging field of commercial aerospace, EZopt is able to optimize trajectories for launch vehicles and perform potential space station- keeping tasks. Furthermore, the software also helps control electromagnetic devices in the automotive industry.

  10. Magnitude and distribution of trunk stresses in telecommunications engineers.

    PubMed Central

    Nicholson, A S; David, P R; Sheppard, N J

    1981-01-01

    The incidence of back injuries has been shown to be greater in occupations as heavy manual work than light manual work. To plan a programme aimed at reducing the incidence of back injuries in industry those workers at high risk of incurring handling accidents and back injuries need to be identified and a knowledge of the specific occupational factors causing such injuries sought. This has been achieved for telecommunications engineers using epidemiological and radio pressure pill methodologies. The results verify the correlation between the back injury rates and physical work stresses of different occupational groups. The magnitude and relative frequency of trunk stresses in hazardous tasks has been determined and compared with those with lower incidences of back disorders. The study has confirmed that in examining manual handling hazards in industrial male populations a critical value of truncal stress can be applied and used to determine the safety of occupational factors in relation to their potential causing or contributing to degenerative back diseases. PMID:7317300

  11. 14 CFR 151.5 - General policies.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... planning and engineering proposal or airport development project must provide for the planning or..., approval of an advance planning and engineering proposal or a project application is limited to planning or airport development necessary for civil aviation. (d) Stage development. In any case in which airport...

  12. 14 CFR 151.5 - General policies.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... planning and engineering proposal or airport development project must provide for the planning or..., approval of an advance planning and engineering proposal or a project application is limited to planning or airport development necessary for civil aviation. (d) Stage development. In any case in which airport...

  13. 14 CFR 151.5 - General policies.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... planning and engineering proposal or airport development project must provide for the planning or..., approval of an advance planning and engineering proposal or a project application is limited to planning or airport development necessary for civil aviation. (d) Stage development. In any case in which airport...

  14. 14 CFR 151.5 - General policies.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... planning and engineering proposal or airport development project must provide for the planning or..., approval of an advance planning and engineering proposal or a project application is limited to planning or airport development necessary for civil aviation. (d) Stage development. In any case in which airport...

  15. 14 CFR 151.5 - General policies.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... planning and engineering proposal or airport development project must provide for the planning or..., approval of an advance planning and engineering proposal or a project application is limited to planning or airport development necessary for civil aviation. (d) Stage development. In any case in which airport...

  16. C-Band Airport Surface Communications System Standards Development. Phase II Final Report. Volume 2: Test Bed Performance Evaluation and Final AeroMACS Recommendations

    NASA Technical Reports Server (NTRS)

    Hall, Edward; Magner, James

    2011-01-01

    This report is provided as part of ITT s NASA Glenn Research Center Aerospace Communication Systems Technical Support (ACSTS) contract NNC05CA85C, Task 7: New ATM Requirements-Future Communications, C-Band and L-Band Communications Standard Development and was based on direction provided by FAA project-level agreements for New ATM Requirements-Future Communications. Task 7 included two subtasks. Subtask 7-1 addressed C-band (5091- to 5150-MHz) airport surface data communications standards development, systems engineering, test bed and prototype development, and tests and demonstrations to establish operational capability for the Aeronautical Mobile Airport Communications System (AeroMACS). Subtask 7-2 focused on systems engineering and development support of the L-band digital aeronautical communications system (L-DACS). Subtask 7-1 consisted of two phases. Phase I included development of AeroMACS concepts of use, requirements, architecture, and initial high-level safety risk assessment. Phase II builds on Phase I results and is presented in two volumes. Volume I is devoted to concepts of use, system requirements, and architecture, including AeroMACS design considerations. Volume II (this document) describes an AeroMACS prototype evaluation and presents final AeroMACS recommendations. This report also describes airport categorization and channelization methodologies. The purposes of the airport categorization task were (1) to facilitate initial AeroMACS architecture designs and enable budgetary projections by creating a set of airport categories based on common airport characteristics and design objectives, and (2) to offer high-level guidance to potential AeroMACS technology and policy development sponsors and service providers. A channelization plan methodology was developed because a common global methodology is needed to assure seamless interoperability among diverse AeroMACS services potentially supplied by multiple service providers.

  17. C-Band Airport Surface Communications System Standards Development. Phase II Final Report. Volume 1: Concepts of Use, Initial System Requirements, Architecture, and AeroMACS Design Considerations

    NASA Technical Reports Server (NTRS)

    Hall, Edward; Isaacs, James; Henriksen, Steve; Zelkin, Natalie

    2011-01-01

    This report is provided as part of ITT s NASA Glenn Research Center Aerospace Communication Systems Technical Support (ACSTS) contract NNC05CA85C, Task 7: New ATM Requirements-Future Communications, C-Band and L-Band Communications Standard Development and was based on direction provided by FAA project-level agreements for New ATM Requirements-Future Communications. Task 7 included two subtasks. Subtask 7-1 addressed C-band (5091- to 5150-MHz) airport surface data communications standards development, systems engineering, test bed and prototype development, and tests and demonstrations to establish operational capability for the Aeronautical Mobile Airport Communications System (AeroMACS). Subtask 7-2 focused on systems engineering and development support of the L-band digital aeronautical communications system (L-DACS). Subtask 7-1 consisted of two phases. Phase I included development of AeroMACS concepts of use, requirements, architecture, and initial high-level safety risk assessment. Phase II builds on Phase I results and is presented in two volumes. Volume I (this document) is devoted to concepts of use, system requirements, and architecture, including AeroMACS design considerations. Volume II describes an AeroMACS prototype evaluation and presents final AeroMACS recommendations. This report also describes airport categorization and channelization methodologies. The purposes of the airport categorization task were (1) to facilitate initial AeroMACS architecture designs and enable budgetary projections by creating a set of airport categories based on common airport characteristics and design objectives, and (2) to offer high-level guidance to potential AeroMACS technology and policy development sponsors and service providers. A channelization plan methodology was developed because a common global methodology is needed to assure seamless interoperability among diverse AeroMACS services potentially supplied by multiple service providers.

  18. Potential Uses of Occupational Analysis Data By Air Force Management Engineering Teams.

    ERIC Educational Resources Information Center

    McFarland, Barry P.

    Both the occupational analysis program and the management engineering program are primarily concerned with task level descriptions of time spent to perform tasks required in the Air Force, the first being personnel specialty code oriented and the second being work center oriented. However two separate and independent techniques have been developed…

  19. An Undergraduate Course on Operating Systems Principles.

    ERIC Educational Resources Information Center

    National Academy of Engineering, Washington, DC. Commission on Education.

    This report is from Task Force VIII of the COSINE Committee of the Commission on Education of the National Academy of Engineering. The task force was established to formulate subject matter for an elective undergraduate subject on computer operating systems principles for students whose major interest is in the engineering of computer systems and…

  20. Influencing the occurrence of mind wandering while reading.

    PubMed

    Kopp, Kristopher; D'Mello, Sidney; Mills, Caitlin

    2015-07-01

    The current concerns hypothesis suggests that directing attention towards unfulfilled plans of the individual prior to a task would result in more off-task thoughts (or mind wandering). In this experiment, participants were asked to read a scientific text and self-report instances of mind wandering by indicating when they were experiencing task-unrelated thoughts (TUTs) or task-related interferences (TRIs). Prior to reading, participants in the individual plans experimental condition were asked to reflect upon their short-term plans by making a "to do" list while participants in a control condition were asked to make a list of the components of an automobile. In support of the current concerns hypothesis, directing attention towards the short-term plans resulted in significantly more TUTs, but not TRIs. Furthermore, participants in the individual plans condition had significantly lower scores on an assessment of reading comprehension, and this relationship was mediated by the frequency of TUTs. Copyright © 2015 Elsevier Inc. All rights reserved.

  1. A testbed for the evaluation of computer aids for enroute flight path planning

    NASA Technical Reports Server (NTRS)

    Smith, Philip J.; Layton, Chuck; Galdes, Deb; Mccoy, C. E.

    1990-01-01

    A simulator study of the five airline flight crews engaged in various enroute planning activities has been conducted. Based on a cognitive task analysis of this data, a flight planning workstation has been developed on a Mac II controlling three color monitors. This workstation is being used to study design concepts to support the flight planning activities of dispatchers and flight crews in part-task simulators.

  2. On-the-fly scheduling as a manifestation of partial-order planning and dynamic task values.

    PubMed

    Hannah, Samuel D; Neal, Andrew

    2014-09-01

    The aim of this study was to develop a computational account of the spontaneous task ordering that occurs within jobs as work unfolds ("on-the-fly task scheduling"). Air traffic control is an example of work in which operators have to schedule their tasks as a partially predictable work flow emerges. To date, little attention has been paid to such on-the-fly scheduling situations. We present a series of discrete-event models fit to conflict resolution decision data collected from experienced controllers operating in a high-fidelity simulation. Our simulations reveal air traffic controllers' scheduling decisions as examples of the partial-order planning approach of Hayes-Roth and Hayes-Roth. The most successful model uses opportunistic first-come-first-served scheduling to select tasks from a queue. Tasks with short deadlines are executed immediately. Tasks with long deadlines are evaluated to assess whether they need to be executed immediately or deferred. On-the-fly task scheduling is computationally tractable despite its surface complexity and understandable as an example of both the partial-order planning strategy and the dynamic-value approach to prioritization.

  3. 46 CFR 91.55-5 - Plans and specifications required for new construction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... systems. (e) Marine engineering. For plans required for marine engineering equipment and systems, see... electrical engineering, equipment and systems, see subchapter J (Electrical Engineering) of this chapter. (g... bottoms, etc., and including inboard and outboard profile. (b) Hull structure. 1 (1) *Inner Bottom Plating...

  4. Lunar-Ultraviolet Telescope Experiment (LUTE) integrated program plan

    NASA Technical Reports Server (NTRS)

    Smith, Janice F. (Compiler); Forrest, Larry

    1993-01-01

    A detailed Lunar Ultraviolet Telescope Experiment (LUTE) program plan representing major decisions and tasks leading to those decisions for program execution are presented. The purpose of this task was to develop an integrated plan of project activities for the LUTE project, and to display the plan as an integrated network that shows the project activities, all critical interfaces, and schedules. The integrated network will provide the project manager with a frame work for strategic planning and risk management throughout the life of the project.

  5. Software Testbed for Developing and Evaluating Integrated Autonomous Subsystems

    NASA Technical Reports Server (NTRS)

    Ong, James; Remolina, Emilio; Prompt, Axel; Robinson, Peter; Sweet, Adam; Nishikawa, David

    2015-01-01

    To implement fault tolerant autonomy in future space systems, it will be necessary to integrate planning, adaptive control, and state estimation subsystems. However, integrating these subsystems is difficult, time-consuming, and error-prone. This paper describes Intelliface/ADAPT, a software testbed that helps researchers develop and test alternative strategies for integrating planning, execution, and diagnosis subsystems more quickly and easily. The testbed's architecture, graphical data displays, and implementations of the integrated subsystems support easy plug and play of alternate components to support research and development in fault-tolerant control of autonomous vehicles and operations support systems. Intelliface/ADAPT controls NASA's Advanced Diagnostics and Prognostics Testbed (ADAPT), which comprises batteries, electrical loads (fans, pumps, and lights), relays, circuit breakers, invertors, and sensors. During plan execution, an experimentor can inject faults into the ADAPT testbed by tripping circuit breakers, changing fan speed settings, and closing valves to restrict fluid flow. The diagnostic subsystem, based on NASA's Hybrid Diagnosis Engine (HyDE), detects and isolates these faults to determine the new state of the plant, ADAPT. Intelliface/ADAPT then updates its model of the ADAPT system's resources and determines whether the current plan can be executed using the reduced resources. If not, the planning subsystem generates a new plan that reschedules tasks, reconfigures ADAPT, and reassigns the use of ADAPT resources as needed to work around the fault. The resource model, planning domain model, and planning goals are expressed using NASA's Action Notation Modeling Language (ANML). Parts of the ANML model are generated automatically, and other parts are constructed by hand using the Planning Model Integrated Development Environment, a visual Eclipse-based IDE that accelerates ANML model development. Because native ANML planners are currently under development and not yet sufficiently capable, the ANML model is translated into the New Domain Definition Language (NDDL) and sent to NASA's EUROPA planning system for plan generation. The adaptive controller executes the new plan, using augmented, hierarchical finite state machines to select and sequence actions based on the state of the ADAPT system. Real-time sensor data, commands, and plans are displayed in information-dense arrays of timelines and graphs that zoom and scroll in unison. A dynamic schematic display uses color to show the real-time fault state and utilization of the system components and resources. An execution manager coordinates the activities of the other subsystems. The subsystems are integrated using the Internet Communications Engine (ICE). an object-oriented toolkit for building distributed applications.

  6. FTS evolution

    NASA Technical Reports Server (NTRS)

    Provost, David E.

    1990-01-01

    Viewgraphs on flight telerobotic servicer evolution are presented. Topics covered include: paths for FTS evolution; frequently performed actions; primary task states; EPS radiator panel installation; generic task definitions; path planning; non-contact alignment; contact planning and control; and human operator interface.

  7. Rotation, Reflection, and Frame Changes; Orthogonal tensors in computational engineering mechanics

    NASA Astrophysics Data System (ADS)

    Brannon, R. M.

    2018-04-01

    Whilst vast literature is available for the most common rotation-related tasks such as coordinate changes, most reference books tend to cover one or two methods, and resources for less-common tasks are scarce. Specialized research applications can be found in disparate journal articles, but a self-contained comprehensive review that covers both elementary and advanced concepts in a manner comprehensible to engineers is rare. Rotation, Reflection, and Frame Changes surveys a refreshingly broad range of rotation-related research that is routinely needed in engineering practice. By illustrating key concepts in computer source code, this book stands out as an unusually accessible guide for engineers and scientists in engineering mechanics.

  8. Software Engineering Improvement Activities/Plan

    NASA Technical Reports Server (NTRS)

    2003-01-01

    bd Systems personnel accomplished the technical responsibilities for this reporting period, as planned. A close working relationship was maintained with personnel of the MSFC Avionics Department Software Group (ED14). Work accomplishments included development, evaluation, and enhancement of a software cost model, performing literature search and evaluation of software tools available for code analysis and requirements analysis, and participating in other relevant software engineering activities. Monthly reports were submitted. This support was provided to the Flight Software Group/ED 1 4 in accomplishing the software engineering improvement engineering activities of the Marshall Space Flight Center (MSFC) Software Engineering Improvement Plan.

  9. Mission analysis of photovoltaic solar energy systems. Quarterly progress report, 1 March 1976-31 May 1976

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Leonard, S.L.; Munjal, P.K.; Rattin, E.J.

    1976-06-01

    The main emphasis of the activity during the second quarter of this project continued to be on Task 1, Analysis of Near-Term Missions, and on Task 2, Analysis of Major Mid-Term Missions. In addition, considerable progress was also made on Task 6, Comparison of the True Societal Costs of Conventional and Photovoltaic Power Production, and starts were made on Task 3, Review and Updating of the ERDA Technology Implementation Plan, and Task 4, Critical External Issues. As was planned, work on Task 5, Impact of Incentives, was deferred to the second half of the program. Progress is reported. (WHK)

  10. Motor planning in different grasping tasks by capuchin monkeys (Sapajus spp.).

    PubMed

    Sabbatini, Gloria; Meglio, Giusy; Truppa, Valentina

    2016-10-01

    Studies on motor planning and action selection in object use reveal that what we choose to do in the present moment depends on our next planned action. In particular, many studies have shown that adult humans initially adopt uncomfortable hand postures to accommodate later task demands (i.e., the end-state comfort effect). Recent studies on action planning in different non-human primates species have provided contrasting results. Here, we tested whether capuchin monkeys (Sapajus spp.), natural tool users, would show planning abilities in two tasks with varying complexity: (i) an object-retrieval task involving self-directed actions (Experiment 1) and (ii) a tool-using task involving actions directed toward an external target (Experiment 2). In Experiment 1, six of 10 monkeys preferentially used a radial grip (i.e., with the thumb-side oriented towards the baited end) to grasp a horizontal dowel with either the left- or right-end baited and bring it to their mouth. In Experiment 2, all six tested capuchins preferentially used a radial grip (i.e., with the thumb-side oriented towards the center of the dowel) to grasp a dowel that was positioned horizontally at different orientations and to dislodge an out-of-reach food reward. Thus, we found that the capuchins showed second-order planning abilities in both tasks, but performance differences emerged in relation to hand preference and learning across sessions. Our findings support the idea that second-order motor planning occurred in an early stage of the primate lineage. Factors affecting the ability of nonhuman primates to estimate motor costs in action selection are discussed. Copyright © 2016 Elsevier B.V. All rights reserved.

  11. Using Transom Jack in the Human Engineering Analysis of the Materials Science Research Rack-1 and Quench Module Insert

    NASA Technical Reports Server (NTRS)

    Dunn, Mariea C.; Alves, Jeffrey R.; Hutchinson, Sonya L.

    1999-01-01

    This paper describes the human engineering analysis performed on the Materials Science Research Rack-1 and Quench Module Insert (MSRR-1/QMI) using Transom Jack (Jack) software. The Jack software was used to model a virtual environment consisting of the MSRR-1/QMI hardware configuration and human figures representing the 95th percentile male and 5th percentile female. The purpose of the simulation was to assess the human interfaces in the design for their ability to meet the requirements of the Pressurized Payloads Interface Requirements Document - International Space Program, Revision C (SSP 57000). Jack was used in the evaluation because of its ability to correctly model anthropometric body measurements and the physical behavior of astronauts working in microgravity, which is referred to as the neutral body posture. The Jack model allows evaluation of crewmember interaction with hardware through task simulation including but not limited to collision avoidance behaviors, hand/eye coordination, reach path planning, and automatic grasping to part contours. Specifically, this virtual simulation depicts the human figures performing the QMI installation and check-out, sample cartridge insertion and removal, and gas bottle drawer removal. These tasks were evaluated in terms of adequate clearance in reach envelopes, adequate accessibility in work envelopes, appropriate line of sight in visual envelopes, and accommodation of full size range for male and female stature maneuverability. The results of the human engineering analysis virtual simulation indicate that most of the associated requirements of SSP 57000 were met. However, some hardware design considerations and crew procedures modifications are recommended to improve accessibility, provide an adequate work envelope, reduce awkward body posture, and eliminate permanent protrusions.

  12. Maximally Expressive Task Modeling

    NASA Technical Reports Server (NTRS)

    Japp, John; Davis, Elizabeth; Maxwell, Theresa G. (Technical Monitor)

    2002-01-01

    Planning and scheduling systems organize "tasks" into a timeline or schedule. The tasks are defined within the scheduling system in logical containers called models. The dictionary might define a model of this type as "a system of things and relations satisfying a set of rules that, when applied to the things and relations, produce certainty about the tasks that are being modeled." One challenging domain for a planning and scheduling system is the operation of on-board experiment activities for the Space Station. The equipment used in these experiments is some of the most complex hardware ever developed by mankind, the information sought by these experiments is at the cutting edge of scientific endeavor, and the procedures for executing the experiments are intricate and exacting. Scheduling is made more difficult by a scarcity of space station resources. The models to be fed into the scheduler must describe both the complexity of the experiments and procedures (to ensure a valid schedule) and the flexibilities of the procedures and the equipment (to effectively utilize available resources). Clearly, scheduling space station experiment operations calls for a "maximally expressive" modeling schema. Modeling even the simplest of activities cannot be automated; no sensor can be attached to a piece of equipment that can discern how to use that piece of equipment; no camera can quantify how to operate a piece of equipment. Modeling is a human enterprise-both an art and a science. The modeling schema should allow the models to flow from the keyboard of the user as easily as works of literature flowed from the pen of Shakespeare. The Ground Systems Department at the Marshall Space Flight Center has embarked on an effort to develop a new scheduling engine that is highlighted by a maximally expressive modeling schema. This schema, presented in this paper, is a synergy of technological advances and domain-specific innovations.

  13. Engineering Sciences Strategic Leadership Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hahn, Heidi A.

    The purpose of this report is to promote the three key elements of engineering capabilities, staff and engagement in coordination with an R&D investment cycle; and establish an Engineering Steering Council to own and guide this leadership plan.

  14. Hydrologic Engineering Center River Analysis System (HEC-RAS) Water Temperature Models Developed for the Missouri River Recovery Management Plan and Environmental Impact Statement

    DTIC Science & Technology

    2017-09-18

    Temperature Models Developed for the Missouri River Recovery Management Plan and Environmental Impact Statement En vi ro nm en ta l L ab or at or y...Engineering Center-River Analysis System (HEC-RAS) Water Temperature Models Developed for the Missouri River Recovery Management Plan and Environmental...Prepared for U.S. Army Corps of Engineers Washington, DC 20314-1000 Under Project 396939, “Missouri River Recovery Management Plan and Environmental

  15. A Multifaceted Approach to Investigating Pre-Task Planning Effects on Paired Oral Test Performance

    ERIC Educational Resources Information Center

    Nitta, Ryo; Nakatsuhara, Fumiyo

    2014-01-01

    Despite the growing popularity of paired format speaking assessments, the effects of pre-task planning time on performance in these formats are not yet well understood. For example, some studies have revealed the benefits of planning but others have not. Using a multifaceted approach including analysis of the process of speaking performance, the…

  16. Attention Demands of Spoken Word Planning: A Review

    PubMed Central

    Roelofs, Ardi; Piai, Vitória

    2011-01-01

    Attention and language are among the most intensively researched abilities in the cognitive neurosciences, but the relation between these abilities has largely been neglected. There is increasing evidence, however, that linguistic processes, such as those underlying the planning of words, cannot proceed without paying some form of attention. Here, we review evidence that word planning requires some but not full attention. The evidence comes from chronometric studies of word planning in picture naming and word reading under divided attention conditions. It is generally assumed that the central attention demands of a process are indexed by the extent that the process delays the performance of a concurrent unrelated task. The studies measured the speed and accuracy of linguistic and non-linguistic responding as well as eye gaze durations reflecting the allocation of attention. First, empirical evidence indicates that in several task situations, processes up to and including phonological encoding in word planning delay, or are delayed by, the performance of concurrent unrelated non-linguistic tasks. These findings suggest that word planning requires central attention. Second, empirical evidence indicates that conflicts in word planning may be resolved while concurrently performing an unrelated non-linguistic task, making a task decision, or making a go/no-go decision. These findings suggest that word planning does not require full central attention. We outline a computationally implemented theory of attention and word planning, and describe at various points the outcomes of computer simulations that demonstrate the utility of the theory in accounting for the key findings. Finally, we indicate how attention deficits may contribute to impaired language performance, such as in individuals with specific language impairment. PMID:22069393

  17. Arizona Community Colleges: Report of the Task Force on Community College Enrollment Growth Planning.

    ERIC Educational Resources Information Center

    Arizona State Board of Directors for Community Colleges, Phoenix.

    The Task Force on Enrollment Growth Planning (TFEGP), authorized in 1992 by the State Board of Directors for Community Colleges (SBDCC) of Arizona, includes representatives from each community college as well as staff from SBDCC office. The Task Force was created to prepare enrollment growth estimates for community colleges through the year 2010;…

  18. The Relationship between Working Memory Capacity and L2 Oral Performance under Task-Based Careful Online Planning Condition

    ERIC Educational Resources Information Center

    Ahmadian, Mohammad Javad

    2012-01-01

    The study reported in this article aimed to investigate the way working memory capacity (WMC) interacts with careful online planning--a task-based implementation variable--to affect second language (L2) speech production. This issue is important to teachers, because it delves into one of the possible task-based implementation variables and thus…

  19. Exploring the Potential of Rehearsal via Automatized Structured Tasks versus Face-to-Face Pair Work to Facilitate Pragmatic and Oral Development

    ERIC Educational Resources Information Center

    Sydorenko, Tetyana V.

    2011-01-01

    Past research has uncovered ways to improve communicative competence, including task-based learner-learner interaction (e.g., R. Ellis, 2003) and task planning (e.g., Mochizuki and Ortega, 2008). Teacher-guided planning particularly increases the benefits of learner-learner interaction (Foster and Skehan, 1999). One component of communicative…

  20. U. S. Atlantic Fleet, Task Force 85. Operation Plan Number 3-44

    DTIC Science & Technology

    1944-07-27

    Potential Targets in Sectors of Responsibility Gril /8thPhib/Al6-3 Serial: 0031(P) DEAN/14- Potential Targets in Se_otors t of Respon- sibility...tags accompany the remains, ANNEX QUEEN MEDICAL PLAN - Page 6 of 8 GrIl /8thPhib/Al6-3 WESTERN NAVAL TASK FORCE, Serial: 0037(P) TASK FORCE EIGHTY-FIVE

  1. Advanced transportation system studies technical area 3: Alternate propulsion subsystem concepts, volume 2

    NASA Technical Reports Server (NTRS)

    Levak, Daniel

    1993-01-01

    The Alternate Propulsion Subsystem Concepts contract had five tasks defined for the first year. The tasks were: F-1A Restart Study, J-2S Restart Study, Propulsion Database Development, Space Shuttle Main Engine (SSME) Upper Stage Use, and CER's for Liquid Propellant Rocket Engines. The detailed study results, with the data to support the conclusions from various analyses, are being reported as a series of five separate Final Task Reports. Consequently, this volume only reports the required programmatic information concerning Computer Aided Design Documentation, and New Technology Reports. A detailed Executive Summary, covering all the tasks, is also available as Volume 1.

  2. Usage Analysis of a Shared Care Planning System

    PubMed Central

    Warren, Jim; Gu, Yulong; Humphrey, Gayl

    2012-01-01

    We examined the content of electronically mediated communications in a trial of shared care planning (SCP) for long-term condition management. Software supports SCP by sharing patient records and care plans among members of the multidisciplinary care team (with patient access). Our analysis focuses on a three-month period with 73 enrolled patients, 149 provider-assigned tasks, 64 clinical notes and 48 care plans with 162 plan elements. Results show that content of notes entries is often related to task assignment and that nurses are the most active users. Directions for refinement of the SCP technology are indicated, including better integration of notes, tasks and care team notifications, as well as the central role of nurses for design use cases. Broader issues are raised about workforce roles and responsibilities for SCP, integrating patient-provider and provider-provider communications, and the centrality of care plans as the key entity in mediation of the care team. PMID:23304370

  3. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1993.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1992-09-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Annual Implementation World Plan (AIWP) presents BPA`s plans for implementing the Program during fiscal year (FY) 1993. The FY 1993 AIWP emphasizes continuation of 143 ongoing or projecting ongoing Programmore » projects, tasks, or task orders, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. The FY 1993 AIWP also contains three new Program projects or tasks that are planned to start in FY 1993.« less

  4. Clinician search behaviors may be influenced by search engine design.

    PubMed

    Lau, Annie Y S; Coiera, Enrico; Zrimec, Tatjana; Compton, Paul

    2010-06-30

    Searching the Web for documents using information retrieval systems plays an important part in clinicians' practice of evidence-based medicine. While much research focuses on the design of methods to retrieve documents, there has been little examination of the way different search engine capabilities influence clinician search behaviors. Previous studies have shown that use of task-based search engines allows for faster searches with no loss of decision accuracy compared with resource-based engines. We hypothesized that changes in search behaviors may explain these differences. In all, 75 clinicians (44 doctors and 31 clinical nurse consultants) were randomized to use either a resource-based or a task-based version of a clinical information retrieval system to answer questions about 8 clinical scenarios in a controlled setting in a university computer laboratory. Clinicians using the resource-based system could select 1 of 6 resources, such as PubMed; clinicians using the task-based system could select 1 of 6 clinical tasks, such as diagnosis. Clinicians in both systems could reformulate search queries. System logs unobtrusively capturing clinicians' interactions with the systems were coded and analyzed for clinicians' search actions and query reformulation strategies. The most frequent search action of clinicians using the resource-based system was to explore a new resource with the same query, that is, these clinicians exhibited a "breadth-first" search behaviour. Of 1398 search actions, clinicians using the resource-based system conducted 401 (28.7%, 95% confidence interval [CI] 26.37-31.11) in this way. In contrast, the majority of clinicians using the task-based system exhibited a "depth-first" search behavior in which they reformulated query keywords while keeping to the same task profiles. Of 585 search actions conducted by clinicians using the task-based system, 379 (64.8%, 95% CI 60.83-68.55) were conducted in this way. This study provides evidence that different search engine designs are associated with different user search behaviors.

  5. Lessons Learned from Crowdsourcing Complex Engineering Tasks

    PubMed Central

    Kijewski-Correa, Tracy; Thain, Douglas; Kareem, Ahsan; Madey, Gregory

    2015-01-01

    Crowdsourcing Crowdsourcing is the practice of obtaining needed ideas, services, or content by requesting contributions from a large group of people. Amazon Mechanical Turk is a web marketplace for crowdsourcing microtasks, such as answering surveys and image tagging. We explored the limits of crowdsourcing by using Mechanical Turk for a more complicated task: analysis and creation of wind simulations. Harnessing Crowdworkers for Engineering Our investigation examined the feasibility of using crowdsourcing for complex, highly technical tasks. This was done to determine if the benefits of crowdsourcing could be harnessed to accurately and effectively contribute to solving complex real world engineering problems. Of course, untrained crowds cannot be used as a mere substitute for trained expertise. Rather, we sought to understand how crowd workers can be used as a large pool of labor for a preliminary analysis of complex data. Virtual Wind Tunnel We compared the skill of the anonymous crowd workers from Amazon Mechanical Turk with that of civil engineering graduate students, making a first pass at analyzing wind simulation data. For the first phase, we posted analysis questions to Amazon crowd workers and to two groups of civil engineering graduate students. A second phase of our experiment instructed crowd workers and students to create simulations on our Virtual Wind Tunnel website to solve a more complex task. Conclusions With a sufficiently comprehensive tutorial and compensation similar to typical crowd-sourcing wages, we were able to enlist crowd workers to effectively complete longer, more complex tasks with competence comparable to that of graduate students with more comprehensive, expert-level knowledge. Furthermore, more complex tasks require increased communication with the workers. As tasks become more complex, the employment relationship begins to become more akin to outsourcing than crowdsourcing. Through this investigation, we were able to stretch and explore the limits of crowdsourcing as a tool for solving complex problems. PMID:26383029

  6. Bidding-based autonomous process planning and scheduling

    NASA Astrophysics Data System (ADS)

    Gu, Peihua; Balasubramanian, Sivaram; Norrie, Douglas H.

    1995-08-01

    Improving productivity through computer integrated manufacturing systems (CIMS) and concurrent engineering requires that the islands of automation in an enterprise be completely integrated. The first step in this direction is to integrate design, process planning, and scheduling. This can be achieved through a bidding-based process planning approach. The product is represented in a STEP model with detailed design and administrative information including design specifications, batch size, and due dates. Upon arrival at the manufacturing facility, the product registered in the shop floor manager which is essentially a coordinating agent. The shop floor manager broadcasts the product's requirements to the machines. The shop contains autonomous machines that have knowledge about their functionality, capabilities, tooling, and schedule. Each machine has its own process planner and responds to the product's request in a different way that is consistent with its capabilities and capacities. When more than one machine offers certain process(es) for the same requirements, they enter into negotiation. Based on processing time, due date, and cost, one of the machines wins the contract. The successful machine updates its schedule and advises the product to request raw material for processing. The concept was implemented using a multi-agent system with the task decomposition and planning achieved through contract nets. The examples are included to illustrate the approach.

  7. Planning performance in schizophrenia patients: a meta-analysis of the influence of task difficulty and clinical and sociodemographic variables.

    PubMed

    Knapp, F; Viechtbauer, W; Leonhart, R; Nitschke, K; Kaller, C P

    2017-08-01

    Despite a large body of research on planning performance in adult schizophrenia patients, results of individual studies are equivocal, suggesting either no, moderate or severe planning deficits. This meta-analysis therefore aimed to quantify planning deficits in schizophrenia and to examine potential sources of the heterogeneity seen in the literature. The meta-analysis comprised outcomes of planning accuracy of 1377 schizophrenia patients and 1477 healthy controls from 31 different studies which assessed planning performance using tower tasks such as the Tower of London, the Tower of Hanoi and the Stockings of Cambridge. A meta-regression analysis was applied to assess the influence of potential moderator variables (i.e. sociodemographic and clinical variables as well as task difficulty). The findings indeed demonstrated a planning deficit in schizophrenia patients (mean effect size: ; 95% confidence interval 0.56-0.78) that was moderated by task difficulty in terms of the minimum number of moves required for a solution. The results did not reveal any significant relationship between the extent of planning deficits and sociodemographic or clinical variables. The current results provide first meta-analytic evidence for the commonly assumed impairments of planning performance in schizophrenia. Deficits are more likely to become manifest in problem items with higher demands on planning ahead, which may at least partly explain the heterogeneity of previous findings. As only a small fraction of studies reported coherent information on sample characteristics, future meta-analyses would benefit from more systematic reports on those variables.

  8. Default Network Modulation and Large-Scale Network Interactivity in Healthy Young and Old Adults

    PubMed Central

    Schacter, Daniel L.

    2012-01-01

    We investigated age-related changes in default, attention, and control network activity and their interactions in young and old adults. Brain activity during autobiographical and visuospatial planning was assessed using multivariate analysis and with intrinsic connectivity networks as regions of interest. In both groups, autobiographical planning engaged the default network while visuospatial planning engaged the attention network, consistent with a competition between the domains of internalized and externalized cognition. The control network was engaged for both planning tasks. In young subjects, the control network coupled with the default network during autobiographical planning and with the attention network during visuospatial planning. In old subjects, default-to-control network coupling was observed during both planning tasks, and old adults failed to deactivate the default network during visuospatial planning. This failure is not indicative of default network dysfunction per se, evidenced by default network engagement during autobiographical planning. Rather, a failure to modulate the default network in old adults is indicative of a lower degree of flexible network interactivity and reduced dynamic range of network modulation to changing task demands. PMID:22128194

  9. Site Characterization Report (Building 202). Volume 2. Appendicies A-H.

    DTIC Science & Technology

    1996-04-01

    Bionetics,Groundwater and Wells, Environmental Science and Engineering, Inc., Installation Assessment of ERADCOM Activities, Environmental Science and...Engineering, Inc., Plan for the Assessment of Contamination at Woodbridge Research Facility, Environmental Science and Engineering, Inc., Remedial...Action Plan for the Woodbridge Research Facility PCB Disposal Site, Environmental Science and Engineering, Inc., Remedial Investigation and

  10. Floor Plans Engine Removal Platform, Hold Down Arm Platform, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Floor Plans - Engine Removal Platform, Hold Down Arm Platform, Hydraulic Equipment Platforms, Isometric Cutaway of Engine Removal Platform, Isometric Cutaway of Hold Down Arm Platform, Isometric Cutaway of Hydraulic Platforms and Engine Support System Access - Marshall Space Flight Center, Saturn V S-IC Static Test Facility, West Test Area, Huntsville, Madison County, AL

  11. Robotic assembly and maintenance of future space stations based on the ISS mission operations experience

    NASA Astrophysics Data System (ADS)

    Rembala, Richard; Ower, Cameron

    2009-10-01

    MDA has provided 25 years of real-time engineering support to Shuttle (Canadarm) and ISS (Canadarm2) robotic operations beginning with the second shuttle flight STS-2 in 1981. In this capacity, our engineering support teams have become familiar with the evolution of mission planning and flight support practices for robotic assembly and support operations at mission control. This paper presents observations on existing practices and ideas to achieve reduced operational overhead to present programs. It also identifies areas where robotic assembly and maintenance of future space stations and space-based facilities could be accomplished more effectively and efficiently. Specifically, our experience shows that past and current space Shuttle and ISS assembly and maintenance operations have used the approach of extensive preflight mission planning and training to prepare the flight crews for the entire mission. This has been driven by the overall communication latency between the earth and remote location of the space station/vehicle as well as the lack of consistent robotic and interface standards. While the early Shuttle and ISS architectures included robotics, their eventual benefits on the overall assembly and maintenance operations could have been greater through incorporating them as a major design driver from the beginning of the system design. Lessons learned from the ISS highlight the potential benefits of real-time health monitoring systems, consistent standards for robotic interfaces and procedures and automated script-driven ground control in future space station assembly and logistics architectures. In addition, advances in computer vision systems and remote operation, supervised autonomous command and control systems offer the potential to adjust the balance between assembly and maintenance tasks performed using extra vehicular activity (EVA), extra vehicular robotics (EVR) and EVR controlled from the ground, offloading the EVA astronaut and even the robotic operator on-orbit of some of the more routine tasks. Overall these proposed approaches when used effectively offer the potential to drive down operations overhead and allow more efficient and productive robotic operations.

  12. 7 CFR 1724.40 - General.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES Electric System Planning... long-term needs for plant additions, improvements, replacements, and retirements for their electric systems. The primary components of the planning system consist of long-range engineering plans and...

  13. 58. Photographic copy of original construction plan (St. Paul Engineer's ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    58. Photographic copy of original construction plan (St. Paul Engineer's Office, Wabasha St. Bridge, Plan of Masonry, February 1899); south abutment - Wabasha Street Bridge, Spanning Mississippi River at Wabasha Street, Saint Paul, Ramsey County, MN

  14. FBIS report. Science and technology: Europe/International, March 29, 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-03-29

    ;Partial Contents: Advanced Materials (EU Project to Improve Production in Metal Matrix Compounds Noted, Germany: Extremely Hard Carbon Coating Development, Italy: Director of CNR Metallic Materials Institute Interviewed); Aerospace (ESA Considers Delays, Reductions as Result of Budget Cuts, Italy: Space Agency`s Director on Restructuring, Future Plans); Automotive, Transportation (EU: Clean Diesel Engine Technology Research Reviewed); Biotechnology (Germany`s Problems, Successes in Biotechnology Discussed); Computers (EU Europort Parallel Computing Project Concluded, Italy: PQE 2000 Project on Massively Parallel Systems Viewed); Defense R&D (France: Future Tasks of `Brevel` Military Intelligence Drone Noted); Energy, Environment (German Scientist Tests Elimination of Phosphates); Advanced Manufacturing (France:more » Advanced Rapid Prototyping System Presented); Lasers, Sensors, Optics (France: Strategy of Cilas Laser Company Detailed); Microelectronics (France: Simulation Company to Develop Microelectronic Manufacturing Application); Nuclear R&D (France: Megajoule Laser Plan, Cooperation with Livermore Lab Noted); S&T Policy (EU Efforts to Aid Small Companies` Research Viewed); Telecommunications (France Telecom`s Way to Internet).« less

  15. Assessment of avionics technology in European aerospace organizations

    NASA Technical Reports Server (NTRS)

    Martinec, D. A.; Baumbick, Robert; Hitt, Ellis; Leondes, Cornelius; Mayton, Monica; Schwind, Joseph; Traybar, Joseph

    1992-01-01

    This report provides a summary of the observations and recommendations made by a technical panel formed by the National Aeronautics and Space Administration (NASA). The panel, comprising prominent experts in the avionics field, was tasked to visit various organizations in Europe to assess the level of technology planned for use in manufactured civil avionics in the future. The primary purpose of the study was to assess avionics systems planned for implementation or already employed on civil aircraft and to evaluate future research, development, and engineering (RD&E) programs, address avionic systems and aircraft programs. The ultimate goal is to ensure that the technology addressed by NASa programs is commensurate with the needs of the aerospace industry at an international level. The panel focused on specific technologies, including guidance and control systems, advanced cockpit displays, sensors and data networks, and fly-by-wire/fly-by-light systems. However, discussions the panel had with the European organizations were not limited to these topics.

  16. Upgrading the Space Shuttle Caution and Warning System

    NASA Technical Reports Server (NTRS)

    McCandless, Jeffrey W.; McCann, Robert S.; Hilty, Bruce T.

    2005-01-01

    A report describes the history and the continuing evolution of an avionic system aboard the space shuttle, denoted the caution and warning system, that generates visual and auditory displays to alert astronauts to malfunctions. The report focuses mainly on planned human-factors-oriented upgrades of an alphanumeric fault-summary display generated by the system. Such upgrades are needed because the display often becomes cluttered with extraneous messages that contribute to the difficulty of diagnosing malfunctions. In the first of two planned upgrades, the fault-summary display will be rebuilt with a more logical task-oriented graphical layout and multiple text fields for malfunction messages. In the second upgrade, information displayed will be changed, such that text fields will indicate only the sources (that is, root causes) of malfunctions; messages that are not operationally useful will no longer appear on the displays. These and other aspects of the upgrades are based on extensive collaboration among astronauts, engineers, and human-factors scientists. The report describes the human-factors principles applied in the upgrades.

  17. The Challenge of Induction! Introducing Engineering Students to Higher Education: A Task-Oriented Approach.

    ERIC Educational Resources Information Center

    Edward, Norrie; Middleton, June

    2002-01-01

    First-year engineering students at Robert Gordon University (Scotland) were presented with a task-oriented induction program. Students were divided into groups and assigned a facilitator, later personal tutor, to whom they could refer. Student reaction to the experience was very favorable. Effect on progression rates is yet to be determined. (AEF)

  18. Establishment of a National Wind Energy Center at University of Houston

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wang, Su Su

    The DOE-supported project objectives are to: establish a national wind energy center (NWEC) at University of Houston and conduct research to address critical science and engineering issues for the development of future large MW-scale wind energy production systems, especially offshore wind turbines. The goals of the project are to: (1) establish a sound scientific/technical knowledge base of solutions to critical science and engineering issues for developing future MW-scale large wind energy production systems, (2) develop a state-of-the-art wind rotor blade research facility at the University of Houston, and (3) through multi-disciplinary research, introducing technology innovations on advanced wind-turbine materials, processing/manufacturingmore » technology, design and simulation, testing and reliability assessment methods related to future wind turbine systems for cost-effective production of offshore wind energy. To achieve the goals of the project, the following technical tasks were planned and executed during the period from April 15, 2010 to October 31, 2014 at the University of Houston: (1) Basic research on large offshore wind turbine systems (2) Applied research on innovative wind turbine rotors for large offshore wind energy systems (3) Integration of offshore wind-turbine design, advanced materials and manufacturing technologies (4) Integrity and reliability of large offshore wind turbine blades and scaled model testing (5) Education and training of graduate and undergraduate students and post- doctoral researchers (6) Development of a national offshore wind turbine blade research facility The research program addresses both basic science and engineering of current and future large wind turbine systems, especially offshore wind turbines, for MW-scale power generation. The results of the research advance current understanding of many important scientific issues and provide technical information for solving future large wind turbines with advanced design, composite materials, integrated manufacturing, and structural reliability and integrity. The educational program have trained many graduate and undergraduate students and post-doctoral level researchers to learn critical science and engineering of wind energy production systems through graduate-level courses and research, and participating in various projects in center’s large multi-disciplinary research. These students and researchers are now employed by the wind industry, national labs and universities to support the US and international wind energy industry. The national offshore wind turbine blade research facility developed in the project has been used to support the technical and training tasks planned in the program to accomplish their goals, and it is a national asset which is available for used by domestic and international researchers in the wind energy arena.« less

  19. Eliciting and characterizing students' mental models within the context of engineering design

    NASA Astrophysics Data System (ADS)

    Dankenbring, Chelsey

    Recently, science education reform documents have called for the incorporation of engineering principles and practices into the K-12 science standards and curriculum. One way this has been done is through the use of engineering design tasks as a way for students to apply their scientific understandings to real-world problems. However, minimal studies have documented students' conceptions within the context of engineering design. Thus, the first chapter of this thesis outlines the steps taken to develop a draw-and-explain item that elicited students' mental models regarding the cause of the four seasons after finishing an engineering design task. Students' mental models regarding the reason for the seasons are also described. The second chapter characterizes students' conceptions regarding sun-Earth relationships, specifically the amount of daylight hours throughout the year, for students who completed either an engineering design task or more traditional learning activities. Results from these studies indicate that draw-and-explain items are an effective way of obtaining students' mental models and that students harbor a variety of alternate conceptions on astronomy related concepts within various learning contexts. Implications from this study include the need for further research regarding how engineering design is used in the classroom and how engineering design facilitates science learning. Also, professional development that allows in-service teachers to gain experience teaching engineering design is needed, as are teacher preparation programs that expose pre-service teachers to engineering design.

  20. Test/QA plan for the verification testing of diesel exhaust catalysts, particulate filters and engine modification control technologies for highway and nonroad use diesel engines

    EPA Science Inventory

    This ETV test/QA plan for heavy-duty diesel engine testing at the Southwest Research Institute’s Department of Emissions Research (DER) describes how the Federal Test Procedure (FTP), as listed in 40 CFR Part 86 for highway engines and 40 CFR Part 89 for nonroad engines, will be ...

  1. Motor planning and execution in left- and right-handed individuals during a bimanual grasping and placing task.

    PubMed

    Hughes, Charmayne M L; Reissig, Paola; Seegelke, Christian

    2011-09-01

    The issue of handedness has been the topic of great interest for researchers in a number of scientific domains. It is typically observed that the dominant hand yields numerous behavioral advantages over the non-dominant hand during unimanual tasks, which provides evidence of hemispheric specialization. In contrast to advantages for the dominant hand during motor execution, recent research has demonstrated that the right hand has advantages during motor planning (regardless of handedness), indicating that motor planning is a specialized function of the left hemisphere. In the present study we explored hemispheric advantages in motor planning and execution in left- and right-handed individuals during a bimanual grasping and placing task. Replicating previous findings, both motor planning and execution was influenced by object end-orientation congruency. In addition, although motor planning (i.e., end-state comfort) was not influenced by hand or handedness, motor execution differed between left and right hand, with shorter object transport times observed for the left hand, regardless of handedness. These results demonstrate that the hemispheric advantages often observed in unimanual tasks do not extend to discrete bimanual tasks. We propose that the differences in object transport time between the two hands arise from overt shifting visual fixation between the two hands/objects. Copyright © 2011 Elsevier B.V. All rights reserved.

  2. PILING PLAN OF SHIPBUILDING WAYS AND WHIRLEY CRANE SUPPORT. United ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PILING PLAN OF SHIPBUILDING WAYS AND WHIRLEY CRANE SUPPORT. United Engineering Company Ltd., Alameda Shipbuilding Plant. General plan and two sections. James J. Walsh, Consulting Engineer. Sheet no. 2. Scales 1 inch to 10 feet, and 1/4 inch to one foot. April 20, 1941, revised 5/7/41. blueprint - United Engineering Company Shipyard, Shipway Nos. 1 & 2, 2900 Main Street, Alameda, Alameda County, CA

  3. 40 CFR Appendix X to Part 86 - Sampling Plans for Selective Enforcement Auditing of Heavy-Duty Engines and Light-Duty Trucks

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 19 2014-07-01 2014-07-01 false Sampling Plans for Selective Enforcement Auditing of Heavy-Duty Engines and Light-Duty Trucks X Appendix X to Part 86 Protection of... AND IN-USE HIGHWAY VEHICLES AND ENGINES Pt. 86, App. X Appendix X to Part 86—Sampling Plans for...

  4. Engineering and Physics Optimization of Breed and Burn Fast Reactor Systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Michael J. Driscoll; Pavel Hejzlar; Peter Yarsky

    2005-12-09

    This project is organized under four major tasks (each of which has two or more subtasks) with contributions among the three collaborating organizations (MIT, INEEL and ANL-West): Task A: Core Physics and Fuel Cycle; Task B: Core Thermal Hydraulics; Task C: Plant Design Task; and D: Fuel Design.

  5. Rolla West master plan : task 2, I-44 interchange--sub consultant services to HNTB.

    DOT National Transportation Integrated Search

    2008-08-01

    Provide support to HNTB as they complete the following tasks: data collection, alternatives workshop, identification of funding : sources, final plan preparation. A full sub consultant scope of service is attached to this application.

  6. Engineering Self-Efficacy Contributing to the Academic Performance of AMAIUB Engineering Students: A Qualitative Investigation

    ERIC Educational Resources Information Center

    Aleta, Beda T.

    2016-01-01

    This research study aims to determine the factors of engineering skills self- efficacy sources contributing on the academic performance of AMAIUB engineering students. Thus, a better measure of engineering self-efficacy is needed to adequately assess engineering students' beliefs in their capabilities to perform tasks in their engineering…

  7. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zaks, D; Fletcher, R; Salamon, S

    Purpose: To develop an online framework that tracks a patient’s plan from initial simulation to treatment and that helps automate elements of the physics plan checks usually performed in the record and verify (RV) system and treatment planning system. Methods: We have developed PlanTracker, an online plan tracking system that automatically imports new patients tasks and follows it through treatment planning, physics checks, therapy check, and chart rounds. A survey was designed to collect information about the amount of time spent by medical physicists in non-physics related tasks. We then assessed these non-physics tasks for automation. Using these surveys, wemore » directed our PlanTracker software development towards the automation of intra-plan physics review. We then conducted a systematic evaluation of PlanTracker’s accuracy by generating test plans in the RV system software designed to mimic real plans, in order to test its efficacy in catching errors both real and theoretical. Results: PlanTracker has proven to be an effective improvement to the clinical workflow in a radiotherapy clinic. We present data indicating that roughly 1/3 of the physics plan check can be automated, and the workflow optimized, and show the functionality of PlanTracker. When the full system is in clinical use we will present data on improvement of time use in comparison to survey data prior to PlanTracker implementation. Conclusion: We have developed a framework for plan tracking and automatic checks in radiation therapy. We anticipate using PlanTracker as a basis for further development in clinical/research software. We hope that by eliminating the most simple and time consuming checks, medical physicists may be able to spend their time on plan quality and other physics tasks rather than in arithmetic and logic checks. We see this development as part of a broader initiative to advance the clinical/research informatics infrastructure surrounding the radiotherapy clinic. This research project has been financially supported by Varian Medical Systems, Palo Alto, CA, through a Varian MRA.« less

  8. 32 CFR 651.4 - Responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) and Materiel Fielding Plans, Demilitarization/Disposal Plans, system engineering reviews/Integrated... (including NEPA) into the system acquisition strategy, milestone review planning, system engineering, and... copy and make this guidance available on the World Wide Web (WWW) and other electronic means. (13...

  9. 5. Photograph of line drawing in possession of Engineering Plans ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. Photograph of line drawing in possession of Engineering Plans and Services Division, Rock Island Arsenal. PLAN, UNDATED. - Rock Island Arsenal, Building No. 105, South Avenue between Gillespie Avenue & Second Street, Rock Island, Rock Island County, IL

  10. Planning and task management in Parkinson's disease: differential emphasis in dual-task performance.

    PubMed

    Bialystok, Ellen; Craik, Fergus I M; Stefurak, Taresa

    2008-03-01

    Seventeen patients diagnosed with Parkinson's disease completed a complex computer-based task that involved planning and management while also performing an attention-demanding secondary task. The tasks were performed concurrently, but it was necessary to switch from one to the other. Performance was compared to a group of healthy age-matched control participants and a group of young participants. Parkinson's patients performed better than the age-matched controls on almost all measures and as well as the young controls in many cases. However, the Parkinson's patients achieved this by paying relatively less attention to the secondary task and focusing attention more on the primary task. Thus, Parkinson's patients can apparently improve their performance on some aspects of a multidimensional task by simplifying task demands. This benefit may occur as a consequence of their inflexible exaggerated attention to some aspects of a complex task to the relative neglect of other aspects.

  11. I Plan Therefore I Choose: Free-Choice Bias Due to Prior Action-Probability but Not Action-Value

    PubMed Central

    Suriya-Arunroj, Lalitta; Gail, Alexander

    2015-01-01

    According to an emerging view, decision-making, and motor planning are tightly entangled at the level of neural processing. Choice is influenced not only by the values associated with different options, but also biased by other factors. Here we test the hypothesis that preliminary action planning can induce choice biases gradually and independently of objective value when planning overlaps with one of the potential action alternatives. Subjects performed center-out reaches obeying either a clockwise or counterclockwise cue-response rule in two tasks. In the probabilistic task, a pre-cue indicated the probability of each of the two potential rules to become valid. When the subsequent rule-cue unambiguously indicated which of the pre-cued rules was actually valid (instructed trials), subjects responded faster to rules pre-cued with higher probability. When subjects were allowed to choose freely between two equally rewarded rules (choice trials) they chose the originally more likely rule more often and faster, despite the lack of an objective advantage in selecting this target. In the amount task, the pre-cue indicated the amount of potential reward associated with each rule. Subjects responded faster to rules pre-cued with higher reward amount in instructed trials of the amount task, equivalent to the more likely rule in the probabilistic task. Yet, in contrast, subjects showed hardly any choice bias and no increase in response speed in favor of the original high-reward target in the choice trials of the amount task. We conclude that free-choice behavior is robustly biased when predictability encourages the planning of one of the potential responses, while prior reward expectations without action planning do not induce such strong bias. Our results provide behavioral evidence for distinct contributions of expected value and action planning in decision-making and a tight interdependence of motor planning and action selection, supporting the idea that the underlying neural mechanisms overlap. PMID:26635565

  12. Power system restoration - A task force report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Adibi, M.; Clelland, P.; Fink, L.

    1986-01-01

    The IEEE PES System Operation Subcommittee has established the Power System Restoration Task Force to: review operating practices, conduct a literature search, prepare relevant glossaries and bibliographies, and promote information exchange through technical papers. This is the first report of the Task Force. The problem of bulk power system restoration following a complete or partial collapse is practically as old as the electric utility industry itself. Many electric utilities have developed over the years system restoration schemes that meet the needs of their particular systems. These plans provide a great deal of insight into how the restorative process is viewedmore » by operating and planning personnel and what concerns and constraints any plan must operate under. The body of the report consists of notes prepared by members of the Task Force. It should not be interred that a complete reporting on Power System Restoration is undertaken here. The intent is to report upon work of the Task Force to date. The report also reviews several different restoration plans and shows their common concerns and constraints.« less

  13. 32 CFR 634.24 - Traffic planning and codes.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... enforcement officer, engineer, safety officer, and other concerned staff agencies. Highway engineering representatives from adjacent civil communities must be consulted to ensure the installation plan is compatible... and minor routes, location of traffic control devices, and conditions requiring engineering or...

  14. 7 CFR 1710.250 - General.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    .... (i) A borrower's CWP or special engineering studies must be supported by a Borrower's Environmental..., and retirements. The primary components of the system consist of long-range engineering plans, construction work plans (CWPs), CWP amendments, and special engineering and cost studies. Long range...

  15. Photographic copy of floor plan, undated, Civil Engineers Office, in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of floor plan, undated, Civil Engineers Office, in possession of Selfridge Base Civil Engineers Office, Mt. Clemens, Michigan - Selfridge Field, Building No. 833, West of Mulberry Street north of George Avenue, Mount Clemens, Macomb County, MI

  16. A representation for error detection and recovery in robot task plans

    NASA Technical Reports Server (NTRS)

    Lyons, D. M.; Vijaykumar, R.; Venkataraman, S. T.

    1990-01-01

    A general definition is given of the problem of error detection and recovery in robot assembly systems, and a general representation is developed for dealing with the problem. This invariant representation involves a monitoring process which is concurrent, with one monitor per task plan. A plan hierarchy is discussed, showing how diagnosis and recovery can be handled using the representation.

  17. An Investigation of the Effectiveness and Validity of Planning Time in Speaking Test Tasks

    ERIC Educational Resources Information Center

    Wigglesworth, Gillian; Elder, Cathie

    2010-01-01

    The study described in this article investigated the relationship between three variables in the IELTS oral module--planning, proficiency, and task--and was designed to enhance our understanding of how or whether these variables interact. The study aimed to determine whether differences in performance resulted from 1 or 2 min of planning time. It…

  18. 77 FR 3241 - Intent To Hold North Dakota Task Force Meeting as Established by the Missouri River Protection...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-23

    ... duties of the Task Force are to prepare and approve a plan for the use of the funds made available under... of the Task Force are to prepare and approve a plan for the use of the funds made available under... Force Meeting as Established by the Missouri River Protection and Improvement Act of 2000 (Title VII...

  19. Collaborative Radiological Response Planning

    DTIC Science & Technology

    2013-12-01

    280-5500 Standard Form 298 (Rev. 2–89) Prescribed by ANSI Std. 239–18 i THIS PAGE INTENTIONALLY LEFT BLANK ii Approved for public release...critical tasks, under specified conditions and performance standards .”33 Aligned with the central objective of Capabilities-Based Planning, the TCL...affect task performance.36 More specifically, measures and performance criteria describe a standard for how well a task must be performed and on

  20. Communication as Part of the Engineering Skills Set

    ERIC Educational Resources Information Center

    Lappalainen, Pia

    2009-01-01

    Engineering graduates are facing changing requirements regarding their competencies, as interdisciplinarity and globalization have transformed engineering communities into collaboration arenas extending beyond uniform national, cultural, contextual and disciplinary settings and structures. Engineers no longer manage their daily tasks with plain…

  1. Design requirements for SRB production control system. Volume 4: Implementation

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The implementation plan which is presented was developed to provide the means for the successful implementation of the automated production control system. There are three factors which the implementation plan encompasses: detailed planning; phased implementation; and user involvement. The plan is detailed to the task level in terms of necessary activities as the system is developed, refined, installed, and tested. These tasks are scheduled, on a preliminary basis, over a two-and-one-half-year time frame.

  2. Small Engine Technology (SET) - Task 13 ANOPP Noise Prediction for Small Engines: Jet Noise Prediction Module, Wing Shielding Module, and System Studies Results

    NASA Technical Reports Server (NTRS)

    Lieber, Lysbeth; Golub, Robert (Technical Monitor)

    2000-01-01

    This Final Report has been prepared by AlliedSignal Engines and Systems, Phoenix, Arizona, documenting work performed during the period May 1997 through June 1999, under the Small Engines Technology Program, Contract No. NAS3-27483, Task Order 13, ANOPP Noise Prediction for Small Engines. The report specifically covers the work performed under Subtasks 4, 5 and 6. Subtask 4 describes the application of a semi-empirical procedure for jet noise prediction, subtask 5 describes the development of a procedure to predict the effects of wing shielding, and subtask 6 describes the results of system studies of the benefits of the new noise technology on business and regional aircraft.

  3. Multi-surface topography targeted plateau honing for the processing of cylinder liner surfaces of automotive engines

    NASA Astrophysics Data System (ADS)

    Lawrence, K. Deepak; Ramamoorthy, B.

    2016-03-01

    Cylinder bores of automotive engines are 'engineered' surfaces that are processed using multi-stage honing process to generate multiple layers of micro geometry for meeting the different functional requirements of the piston assembly system. The final processed surfaces should comply with several surface topographic specifications that are relevant for the good tribological performance of the engine. Selection of the process parameters in three stages of honing to obtain multiple surface topographic characteristics simultaneously within the specification tolerance is an important module of the process planning and is often posed as a challenging task for the process engineers. This paper presents a strategy by combining the robust process design and gray-relational analysis to evolve the operating levels of honing process parameters in rough, finish and plateau honing stages targeting to meet multiple surface topographic specifications on the final running surface of the cylinder bores. Honing experiments were conducted in three stages namely rough, finish and plateau honing on cast iron cylinder liners by varying four honing process parameters such as rotational speed, oscillatory speed, pressure and honing time. Abbott-Firestone curve based functional parameters (Rk, Rpk, Rvk, Mr1 and Mr2) coupled with mean roughness depth (Rz, DIN/ISO) and honing angle were measured and identified as the surface quality performance targets to be achieved. The experimental results have shown that the proposed approach is effective to generate cylinder liner surface that would simultaneously meet the explicit surface topographic specifications currently practiced by the industry.

  4. Job Prospects of 1971 Graduates. Engineering Manpower Bulletin Number 20.

    ERIC Educational Resources Information Center

    Alden, John D.

    Statistics for 33,902 of 1971 engineering graduates were used to describe job prospects of the graduates. Findings include: (1) engineering graduates were largely successful in finding jobs or carrying out other plans; (2) about one out of every five engineering graduates at the bachelor's and master's degree levels had plans to continue full-time…

  5. RAFCON: A Graphical Tool for Engineering Complex, Robotic Tasks

    DTIC Science & Technology

    2016-10-09

    Robotic tasks are becoming increasingly complex, and with this also the robotic systems. This requires new tools to manage this complexity and to...execution of robotic tasks, called RAFCON. These tasks are described in hierarchical state machines supporting concurrency. A formal notation of this concept

  6. Improving child and adolescent psychiatry education for medical students: an inter-organizational collaborative action plan.

    PubMed

    Fox, Geraldine S; Stock, Saundra; Briscoe, Gregory W; Beck, Gary L; Horton, Rita; Hunt, Jeffrey I; Liu, Howard Y; Partner Rutter, Ashley; Sexson, Sandra; Schlozman, Steven C; Stubbe, Dorothy E; Stuber, Margaret L

    2012-11-01

    A new Child and Adolescent Psychiatry in Medical Education (CAPME) Task Force, sponsored by the Association for Directors of Medical Student Education in Psychiatry (ADMSEP), has created an inter-organizational partnership between child and adolescent psychiatry (CAP) educators and medical student educators in psychiatry. This paper outlines the task force design and strategic plan to address the long-standing dearth of CAP training for medical students. The CAPME ADMSEP Task Force, formed in 2010, identified common challenges to teaching CAP among ADMSEP's CAPME Task Force members, utilizing focus-group discussions and a needs-assessment survey. The Task Force was organized into five major sections, with inter-organizational action plans to address identified areas of need, such as portable modules and development of benchmark CAP competencies. The authors predict that all new physicians, regardless of specialty, will be better trained in CAP. Increased exposure may also improve recruitment into this underserved area.

  7. Investigation of automated task learning, decomposition and scheduling

    NASA Technical Reports Server (NTRS)

    Livingston, David L.; Serpen, Gursel; Masti, Chandrashekar L.

    1990-01-01

    The details and results of research conducted in the application of neural networks to task planning and decomposition are presented. Task planning and decomposition are operations that humans perform in a reasonably efficient manner. Without the use of good heuristics and usually much human interaction, automatic planners and decomposers generally do not perform well due to the intractable nature of the problems under consideration. The human-like performance of neural networks has shown promise for generating acceptable solutions to intractable problems such as planning and decomposition. This was the primary reasoning behind attempting the study. The basis for the work is the use of state machines to model tasks. State machine models provide a useful means for examining the structure of tasks since many formal techniques have been developed for their analysis and synthesis. It is the approach to integrate the strong algebraic foundations of state machines with the heretofore trial-and-error approach to neural network synthesis.

  8. 13. Photograph of line drawing in possession of Engineering Plans ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. Photograph of line drawing in possession of Engineering Plans and Services Division, Rock Island Arsenal. BASEMENT PLAN, 1920. - Rock Island Arsenal, Building No. 90, East Avenue between North Avenue & King Drive, Rock Island, Rock Island County, IL

  9. 6. photograph of line drawing in possession of Engineering Plans ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. photograph of line drawing in possession of Engineering Plans and Services Division, Rock Island Arsenal. ELEVATIONS AND PLANS FOR POWDER BARREL RACK, 1889. - Rock Island Arsenal, Building No. 280, Sylvan Drive, Rock Island, Rock Island County, IL

  10. 15. Photograph of line drawing in possession of Engineering Plans ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Photograph of line drawing in possession of Engineering Plans and Services Division, Rock Island Arsenal. SECOND FLOOR PLAN, 1920. - Rock Island Arsenal, Building No. 90, East Avenue between North Avenue & King Drive, Rock Island, Rock Island County, IL

  11. 14. Photograph of line drawing in possession of Engineering Plans ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. Photograph of line drawing in possession of Engineering Plans and Services Division, Rock Island Arsenal. FIRST FLOOR PLAN, 1920. - Rock Island Arsenal, Building No. 90, East Avenue between North Avenue & King Drive, Rock Island, Rock Island County, IL

  12. 16. Photograph of line drawing in possession of Engineering Plans ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. Photograph of line drawing in possession of Engineering Plans and Services Division, Rock Island Arsenal. ATTIC PLAN, 1920. - Rock Island Arsenal, Building No. 90, East Avenue between North Avenue & King Drive, Rock Island, Rock Island County, IL

  13. Integrated propulsion technology demonstrator. Program plan

    NASA Technical Reports Server (NTRS)

    1994-01-01

    NASA and Rockwell have embarked on a cooperative agreement to define, develop, fabricate, and operate an integrated propulsion technology demonstrator (IPTD) for the purpose of validating design, process, and technology improvements of launch vehicle propulsion systems. This program, a result of NRA8-11, Task Area 1 A, is jointly funded by both NASA and Rockwell and is sponsored by the Reusable Launch Vehicle office at NASA Marshall Space flight Center. This program plan provides to the joint NASA/Rockwell integrated propulsion technology demonstrator (IPTD) team a description of the activities within tasks / sub tasks and associated schedules required to successfully achieve program objectives. This document also defines the cost elements and manpower allocations for each sub task for purpose of program control. This plan is updated periodically by developing greater depth of direction for outyear tasks as the program matures. Updating is accomplished by adding revisions to existing pages or attaching page revisions to this plan. In either case, revisions will be identified by appropriate highlighting of the change, or specifying a revision page through the use of footnotes on the bottom right of each change page. Authorization for the change is provided by the principal investigators to maintain control of this program plan document and IPTD program activities.

  14. Multi-Task Project to Provide Research Support for Human Research and Engineering Goals Identified by the Army

    DTIC Science & Technology

    2009-06-01

    Jefferson City, MO Phone:573-681-5126 E-mail: rooneyi(a>lincolnu.edu Principle Investigators for contract’s 5 Task Areas: Task I : James Rooney...identified Tasks all structured within a single contract. This contract contained Five Task areas: Task I was an administrative task; Task II-V were...Manager’s Overview of the Report (Task I ) 3. Summary Final Budget Invoice and Budget unspent balance 4. Technical Reports of the Research Tasks (II - V

  15. Photocopy of plan (in U.S. Army office of Army Engineers ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of plan (in U.S. Army office of Army Engineers plans and drawings, Fort Hancock and Sandy hook proving ground, record group 7, drawer 44, Cartographic and Architectural branc, The National Archives, Washington, DC), U.S. Engineer Office, New York District, Harbor Defenses of New York Mine Boathouse, location plan and elevations, Fort Hancock, New Jersey, July 1943 Detail of western docking structure - U.S. Coast Guard Sandy Hook Station, Western Docking Structure, West of intersection of Canfield Road & Hartshorne Drive, Highlands, Monmouth County, NJ

  16. Report of the Nuclear Propulsion Mission Analysis, Figures of Merit Subpanel: Quantifiable figures of merit for nuclear thermal propulsion

    NASA Technical Reports Server (NTRS)

    Haynes, Davy A.

    1991-01-01

    The results of an inquiry by the Nuclear Propulsion Mission Analysis, Figures of Merit subpanel are given. The subpanel was tasked to consider the question of what are the appropriate and quantifiable parameters to be used in the definition of an overall figure of merit (FoM) for Mars transportation system (MTS) nuclear thermal rocket engines (NTR). Such a characterization is needed to resolve the NTR engine design trades by a logical and orderly means, and to provide a meaningful method for comparison of the various NTR engine concepts. The subpanel was specifically tasked to identify the quantifiable engine parameters which would be the most significant engine factors affecting an overall FoM for a MTS and was not tasked with determining 'acceptable' or 'recommended' values for the identified parameters. In addition, the subpanel was asked not to define an overall FoM for a MTS. Thus, the selection of a specific approach, applicable weighting factors, to any interrelationships, for establishing an overall numerical FoM were considered beyond the scope of the subpanel inquiry.

  17. Advanced High Temperature Polymer Matrix Composites for Gas Turbine Engines Program Expansion

    NASA Technical Reports Server (NTRS)

    Hanley, David; Carella, John

    1999-01-01

    This document, submitted by AlliedSignal Engines (AE), a division of AlliedSignal Aerospace Company, presents the program final report for the Advanced High Temperature Polymer Matrix Composites for Gas Turbine Engines Program Expansion in compliance with data requirements in the statement of work, Contract No. NAS3-97003. This document includes: 1 -Technical Summary: a) Component Design, b) Manufacturing Process Selection, c) Vendor Selection, and d) Testing Validation: 2-Program Conclusion and Perspective. Also, see the Appendix at the back of this report. This report covers the program accomplishments from December 1, 1996, to August 24, 1998. The Advanced High Temperature PMC's for Gas Turbine Engines Program Expansion was a one year long, five task technical effort aimed at designing, fabricating and testing a turbine engine component using NASA's high temperature resin system AMB-21. The fiber material chosen was graphite T650-35, 3K, 8HS with UC-309 sizing. The first four tasks included component design and manufacturing, process selection, vendor selection, component fabrication and validation testing. The final task involved monthly financial and technical reports.

  18. 12. Historic plot plan and drawings index for rocket engine ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. Historic plot plan and drawings index for rocket engine test facility, June 28, 1956. NASA GRC drawing number CE-101810. On file at NASA Glenn Research Center. - Rocket Engine Testing Facility, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  19. Knowledge-based system verification and validation

    NASA Technical Reports Server (NTRS)

    Johnson, Sally C.

    1990-01-01

    The objective of this task is to develop and evaluate a methodology for verification and validation (V&V) of knowledge-based systems (KBS) for space station applications with high reliability requirements. The approach consists of three interrelated tasks. The first task is to evaluate the effectiveness of various validation methods for space station applications. The second task is to recommend requirements for KBS V&V for Space Station Freedom (SSF). The third task is to recommend modifications to the SSF to support the development of KBS using effectiveness software engineering and validation techniques. To accomplish the first task, three complementary techniques will be evaluated: (1) Sensitivity Analysis (Worchester Polytechnic Institute); (2) Formal Verification of Safety Properties (SRI International); and (3) Consistency and Completeness Checking (Lockheed AI Center). During FY89 and FY90, each contractor will independently demonstrate the user of his technique on the fault detection, isolation, and reconfiguration (FDIR) KBS or the manned maneuvering unit (MMU), a rule-based system implemented in LISP. During FY91, the application of each of the techniques to other knowledge representations and KBS architectures will be addressed. After evaluation of the results of the first task and examination of Space Station Freedom V&V requirements for conventional software, a comprehensive KBS V&V methodology will be developed and documented. Development of highly reliable KBS's cannot be accomplished without effective software engineering methods. Using the results of current in-house research to develop and assess software engineering methods for KBS's as well as assessment of techniques being developed elsewhere, an effective software engineering methodology for space station KBS's will be developed, and modification of the SSF to support these tools and methods will be addressed.

  20. Lessons Learned from Crowdsourcing Complex Engineering Tasks.

    PubMed

    Staffelbach, Matthew; Sempolinski, Peter; Kijewski-Correa, Tracy; Thain, Douglas; Wei, Daniel; Kareem, Ahsan; Madey, Gregory

    2015-01-01

    Crowdsourcing is the practice of obtaining needed ideas, services, or content by requesting contributions from a large group of people. Amazon Mechanical Turk is a web marketplace for crowdsourcing microtasks, such as answering surveys and image tagging. We explored the limits of crowdsourcing by using Mechanical Turk for a more complicated task: analysis and creation of wind simulations. Our investigation examined the feasibility of using crowdsourcing for complex, highly technical tasks. This was done to determine if the benefits of crowdsourcing could be harnessed to accurately and effectively contribute to solving complex real world engineering problems. Of course, untrained crowds cannot be used as a mere substitute for trained expertise. Rather, we sought to understand how crowd workers can be used as a large pool of labor for a preliminary analysis of complex data. We compared the skill of the anonymous crowd workers from Amazon Mechanical Turk with that of civil engineering graduate students, making a first pass at analyzing wind simulation data. For the first phase, we posted analysis questions to Amazon crowd workers and to two groups of civil engineering graduate students. A second phase of our experiment instructed crowd workers and students to create simulations on our Virtual Wind Tunnel website to solve a more complex task. With a sufficiently comprehensive tutorial and compensation similar to typical crowd-sourcing wages, we were able to enlist crowd workers to effectively complete longer, more complex tasks with competence comparable to that of graduate students with more comprehensive, expert-level knowledge. Furthermore, more complex tasks require increased communication with the workers. As tasks become more complex, the employment relationship begins to become more akin to outsourcing than crowdsourcing. Through this investigation, we were able to stretch and explore the limits of crowdsourcing as a tool for solving complex problems.

  1. New Directions for NASA's Advanced Life Support Program

    NASA Technical Reports Server (NTRS)

    Barta, Daniel J.

    2006-01-01

    Advanced Life Support (ALS), an element of Human Systems Research and Technology s (HSRT) Life Support and Habitation Program (LSH), has been NASA s primary sponsor of life support research and technology development for the agency. Over its history, ALS sponsored tasks across a diverse set of institutions, including field centers, colleges and universities, industry, and governmental laboratories, resulting in numerous publications and scientific articles, patents and new technologies, as well as education and training for primary, secondary and graduate students, including minority serving institutions. Prior to the Vision for Space Exploration (VSE) announced on January 14th, 2004 by the President, ALS had been focused on research and technology development for long duration exploration missions, emphasizing closed-loop regenerative systems, including both biological and physicochemical. Taking a robust and flexible approach, ALS focused on capabilities to enable visits to multiple potential destinations beyond low Earth orbit. ALS developed requirements, reference missions, and assumptions upon which to structure and focus its development program. The VSE gave NASA a plan for steady human and robotic space exploration based on specific, achievable goals. Recently, the Exploration Systems Architecture Study (ESAS) was chartered by NASA s Administrator to determine the best exploration architecture and strategy to implement the Vision. The study identified key technologies required to enable and significantly enhance the reference exploration missions and to prioritize near-term and far-term technology investments. This technology assessment resulted in a revised Exploration Systems Mission Directorate (ESMD) technology investment plan. A set of new technology development projects were initiated as part of the plan s implementation, replacing tasks previously initiated under HSRT and its sister program, Exploration Systems Research and Technology (ESRT). The Exploration Life Support (ELS) Project, under the Exploration Technology Development Program, has recently been initiated to perform directed life support technology development in support of Constellation and the Crew Exploration Vehicle (CEV). ELS) has replaced ALS, with several major differences. Thermal Control Systems have been separated into a new stand alone project (Thermal Systems for Exploration Missions). Tasks in Advanced Food Technology have been relocated to the Human Research Program. Tasks in a new discipline area, Habitation Engineering, have been added. Research and technology development for capabilities required for longer duration stays on the Moon and Mars, including bioregenerative system, have been deferred.

  2. FIRST FLOOR PLAN AND SCHEDULES. United Engineering Company Ltd., Alameda ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FIRST FLOOR PLAN AND SCHEDULES. United Engineering Company Ltd., Alameda Shipyard, Ship Repair Facilities, Office Building. First floor plan, door transom schedule, interior finish schedule, sash schedule, exterior color schedule, and location plot plan. John Hudspeth, Architect, at foot of Main Street, Alameda, Calif. Sheet no. Al of 8 sheets, Plan no. 10,007. Scale 1/8 inch to the foot. March 18, 1942, last revised 9/25/43. U.S. Navy, Bureau of Yards & Docks, Contract no. bs 76. Approved for construction October 9, 1943. blueprint - United Engineering Company Shipyard, Office Building No. 137, 2900 Main Street, Alameda, Alameda County, CA

  3. Small Engine and Related Equipment Repair Curriculum Guide. Michigan Trade and Industrial Education.

    ERIC Educational Resources Information Center

    Michigan State Univ., East Lansing. Coll. of Agriculture and Natural Resources Education Inst.

    This task-based curriculum guide for small engine and related equipment repair is intended to help the teacher develop a classroom management system where students learn by doing. Introductory materials include a Dictionary of Occupational Titles job code and title sheet, a career ladder, a matrix relating duty/task numbers to job titles, and a…

  4. Revolutionary opportunities for materials and structures study, addendum

    NASA Technical Reports Server (NTRS)

    Feig, P. D.

    1987-01-01

    This report is an addendum to the Revolutionary Opportunities for Materials and Structures Study (ROMS), modifying the original by the addition of two tasks. The primary purpose of these tasks was to conduct additional aircraft/engine sizing and mission analysis to obtain contributory aircraft performance data such as fuel burns and direct operating costs for both the subsonic and supersonic engines.

  5. A Study of Entry-Level Employment Technological Competencies for the Junior College Graduates Majoring in Electronic Engineering.

    ERIC Educational Resources Information Center

    Chen, Woei-Kae; Chang, Liang-Te

    A study examined the technological competencies of the electronic engineering departments of junior colleges in Taiwan. It used a combination of two methods--a revised DACUM (Developing a Curriculum) process and a revised V-TECS (Vocational-Technical Education Consortium of States) process--to analyze the duty/task profile and task/element list of…

  6. Automatic mission planning algorithms for aerial collection of imaging-specific tasks

    NASA Astrophysics Data System (ADS)

    Sponagle, Paul; Salvaggio, Carl

    2017-05-01

    The rapid advancement and availability of small unmanned aircraft systems (sUAS) has led to many novel exploitation tasks utilizing that utilize this unique aerial imagery data. Collection of this unique data requires novel flight planning to accomplish the task at hand. This work describes novel flight planning to better support structure-from-motion missions to minimize occlusions, autonomous and periodic overflight of reflectance calibration panels to permit more efficient and accurate data collection under varying illumination conditions, and the collection of imagery data to study optical properties such as the bidirectional reflectance distribution function without disturbing the target in sensitive or remote areas of interest. These novel mission planning algorithms will provide scientists with additional tools to meet their future data collection needs.

  7. Elementary Students' Learning of Materials Science Practices Through Instruction Based on Engineering Design Tasks

    NASA Astrophysics Data System (ADS)

    Wendell, Kristen Bethke; Lee, Hee-Sun

    2010-12-01

    Materials science, which entails the practices of selecting, testing, and characterizing materials, is an important discipline within the study of matter. This paper examines how third grade students' materials science performance changes over the course of instruction based on an engineering design challenge. We conducted a case study of nine students who participated in engineering design-based science instruction with the goal of constructing a stable, quiet, thermally comfortable model house. The learning outcome of materials science practices was assessed by clinical interviews conducted before and after the instruction, and the learning process was assessed by students' workbooks completed during the instruction. The interviews included two materials selection tasks for designing a sturdy stepstool and an insulated pet habitat. Results indicate that: (1) students significantly improved on both materials selection tasks, (2) their gains were significantly positively associated with the degree of completion of their workbooks, and (3) students who were highly engaged with the workbook's reflective record-keeping tasks showed the greatest improvement on the interviews. These findings suggest the important role workbooks can play in facilitating elementary students' learning of science through authentic activity such as engineering design.

  8. Engine throat/nozzle optics for plume spectroscopy

    NASA Technical Reports Server (NTRS)

    Bickford, R. L.; Duncan, D. B.

    1991-01-01

    The Task 2.0 Engine Throat/Nozzle Optics for Plume Spectroscopy, effort was performed under the NASA LeRC Development of Life Prediction Capabilities for Liquid Propellant Rocket Engines program. This Task produced the engineering design of an optical probe to enable spectroscopic measurements within the SSME main chamber. The probe mounts on the SSME nozzle aft manifold and collects light emitted from the throat plane and chamber. Light collected by the probe is transferred to a spectrometer through a fiber optic cable. The design analyses indicate that the probe will function throughout the engine operating cycle and is suitable for both test stand and flight operations. By detecting metallic emissions that are indicative of component degradation or incipient failure, engine shutdown can be initiated before catastrophic failure. This capability will protect valuable test stand hardware and provide enhanced mission safety.

  9. Robot Task Commander with Extensible Programming Environment

    NASA Technical Reports Server (NTRS)

    Hart, Stephen W (Inventor); Wightman, Brian J (Inventor); Dinh, Duy Paul (Inventor); Yamokoski, John D. (Inventor); Gooding, Dustin R (Inventor)

    2014-01-01

    A system for developing distributed robot application-level software includes a robot having an associated control module which controls motion of the robot in response to a commanded task, and a robot task commander (RTC) in networked communication with the control module over a network transport layer (NTL). The RTC includes a script engine(s) and a GUI, with a processor and a centralized library of library blocks constructed from an interpretive computer programming code and having input and output connections. The GUI provides access to a Visual Programming Language (VPL) environment and a text editor. In executing a method, the VPL is opened, a task for the robot is built from the code library blocks, and data is assigned to input and output connections identifying input and output data for each block. A task sequence(s) is sent to the control module(s) over the NTL to command execution of the task.

  10. An examination of the identity development of African American undergraduate engineering students attending an HBCU

    NASA Astrophysics Data System (ADS)

    Taylor, Kenneth J.

    This study examined the identity development for a sample of 90 African American undergraduate engineering male and female students attending an HBCU. Using the Student Development Task and Lifestyle Assessment (SDTLA), which is based on Chickering and Reisser's identity development theory, differences in identity development were examined with respect to gender, academic classification, and grade point average. Previous research has shown the need to look beyond academic factors to understand and influence the persistence of African American engineering students. Non-cognitive factors, including identity development have proven to be influential in predicting persistence, especially for African American engineering students. Results from the analysis revealed significant means for academic classification and five of the dependent variables to include career planning peer relations, emotional autonomy, educational involvement, and establishing and clarifying purpose. Post hoc analysis confirmed significant differences for four of those dependent variables. However, the analysis failed to confirm statistical significant differences in peer relations due to academic classification. The significant decline in the mean scores for development in these four areas, as students progressed from sophomore to senior year revealed strong implications for the need to provide programming and guidance for those students. Institutions of higher education should provide more attention to the non-cognitive areas of development as a means of understanding identity development and working toward creating support systems for students.

  11. Variable Cycle Engine Technology Program Planning and Definition Study

    NASA Technical Reports Server (NTRS)

    Westmoreland, J. S.; Stern, A. M.

    1978-01-01

    The variable stream control engine, VSCE-502B, was selected as the base engine, with the inverted flow engine concept selected as a backup. Critical component technologies were identified, and technology programs were formulated. Several engine configurations were defined on a preliminary basis to serve as demonstration vehicles for the various technologies. The different configurations present compromises in cost, technical risk, and technology return. Plans for possible variably cycle engine technology programs were formulated by synthesizing the technology requirements with the different demonstrator configurations.

  12. Improving aircraft energy efficiency

    NASA Technical Reports Server (NTRS)

    Povinelli, F. P.; Klineberg, J. M.; Kramer, J. J.

    1976-01-01

    Investigations conducted by a NASA task force concerning the development of aeronautical fuel-conservation technology are considered. The task force estimated the fuel savings potential, prospects for implementation in the civil air-transport fleet, and the impact of the technology on air-transport fuel use. Propulsion advances are related to existing engines in the fleet, to new production of current engine types, and to new engine designs. Studies aimed at the evolutionary improvement of aerodynamic design and a laminar flow control program are discussed and possibilities concerning the use of composite structural materials are examined.

  13. A Planning Approach of Engineering Characteristics Based on QFD-TRIZ Integrated

    NASA Astrophysics Data System (ADS)

    Liu, Shang; Shi, Dongyan; Zhang, Ying

    Traditional QFD planning method compromises contradictions between engineering characteristics to achieve higher customer satisfaction. However, this compromise trade-off can not eliminate the contradictions existing among the engineering characteristics which limited the overall customer satisfaction. QFD (Quality function deployment) integrated with TRIZ (the Russian acronym of the Theory of Inventive Problem Solving) becomes hot research recently for TRIZ can be used to solve contradictions between engineering characteristics which construct the roof of HOQ (House of quality). But, the traditional QFD planning approach is not suitable for QFD integrated with TRIZ for that TRIZ requires emphasizing the contradictions between engineering characteristics at problem definition stage instead of compromising trade-off. So, a new planning approach based on QFD / TRIZ integration is proposed in this paper, which based on the consideration of the correlation matrix of engineering characteristics and customer satisfaction on the basis of cost. The proposed approach suggests that TRIZ should be applied to solve contradictions at the first step, and the correlation matrix of engineering characteristics should be amended at the second step, and at next step IFR (ideal final result) must be validated, then planning execute. An example is used to illustrate the proposed approach. The application indicated that higher customer satisfaction can be met and the contradictions between the characteristic parameters are eliminated.

  14. 40 CFR 35.937 - Subagreements for architectural or engineering services.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., surveys, evaluations, consultations, planning, programing, conceptual designs, plans and specifications... engineering services. Those professional services associated with research, development, design and...

  15. 40 CFR 35.937 - Subagreements for architectural or engineering services.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... engineering services. Those professional services associated with research, development, design and..., surveys, evaluations, consultations, planning, programing, conceptual designs, plans and specifications...

  16. 40 CFR 35.937 - Subagreements for architectural or engineering services.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... engineering services. Those professional services associated with research, development, design and..., surveys, evaluations, consultations, planning, programing, conceptual designs, plans and specifications...

  17. 40 CFR 35.937 - Subagreements for architectural or engineering services.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... engineering services. Those professional services associated with research, development, design and..., surveys, evaluations, consultations, planning, programing, conceptual designs, plans and specifications...

  18. 40 CFR 35.937 - Subagreements for architectural or engineering services.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... engineering services. Those professional services associated with research, development, design and..., surveys, evaluations, consultations, planning, programing, conceptual designs, plans and specifications...

  19. 5. Photograph of line drawing in possession of Engineering Plans ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. Photograph of line drawing in possession of Engineering Plans and Services Division, Rock Island Arsenal. PLAN, ELEVATION, AND SECTION, 1874; TRACING, 1935. - Rock Island Arsenal, Building No. 53, North Avenue North of Midpoint, Rock Island, Rock Island County, IL

  20. 8. Photograph of line drawing in possession of Engineering Plans ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. Photograph of line drawing in possession of Engineering Plans and Services Division, Rock Island Arsenal. PLAN AND SECTION, AUGUST 24, 1874. - Rock Island Arsenal, Building No. 105, South Avenue between Gillespie Avenue & Second Street, Rock Island, Rock Island County, IL

  1. TRANSMISSION NETWORK PLANNING METHOD FOR COMPARATIVE STUDIES (JOURNAL VERSION)

    EPA Science Inventory

    An automated transmission network planning method for comparative studies is presented. This method employs logical steps that may closely parallel those taken in practice by the planning engineers. Use is made of a sensitivity matrix to simulate the engineers' experience in sele...

  2. The Ames-Lockheed orbiter processing scheduling system

    NASA Technical Reports Server (NTRS)

    Zweben, Monte; Gargan, Robert

    1991-01-01

    A general purpose scheduling system and its application to Space Shuttle Orbiter Processing at the Kennedy Space Center (KSC) are described. Orbiter processing entails all the inspection, testing, repair, and maintenance necessary to prepare the Shuttle for launch and takes place within the Orbiter Processing Facility (OPF) at KSC, the Vehicle Assembly Building (VAB), and on the launch pad. The problems are extremely combinatoric in that there are thousands of tasks, resources, and other temporal considerations that must be coordinated. Researchers are building a scheduling tool that they hope will be an integral part of automating the planning and scheduling process at KSC. The scheduling engine is domain independent and is also being applied to Space Shuttle cargo processing problems as well as wind tunnel scheduling problems.

  3. Terrestrial Environment (Climatic) Criteria Handbook for Use in Aerospace Vehicle Development

    NASA Technical Reports Server (NTRS)

    Johnson, Dale L.; Vaughan, William W.

    2004-01-01

    Aerospace Meteorology provides the identification of that aspect of meteorology that is concerned with the definition and modeling of atmospheric parameters for use in aerospace vehicle development, mission planning and operational capability assessments. One of the principal sources of this information is the NASA-HDBK-1001 "Terrestrial Environment (Climatic) Criteria Handbook for Use in Aerospace Vehicle Development'. This handbook was approved by the NASA Chief Engineer in 2000 as a NASA Preferred Technical Standard . Its technical contents were based on natural environment statistics/models and criteria developed mostly in the early 1990's. A task was approved to completely update the handbook to reflect the current state-of-the-art in the various terrestrial environment climatic areas.

  4. Business process study simulation for resource management in an emergency department.

    PubMed

    Poomkothammal, Velusamy

    2006-01-01

    Alexandra Hospital conducted a business process reengineering exercise for all its main processes in order to further improve on their efficiencies with the ultimate aim to provide a higher level of services to patients. The goal of the DEM is to manage an anticipated increase in the volume of patients without much increase in resources. As a start, the Department of Emergency (DEM) medicine studied its AS-IS process and has designed and implemented the new TO-BE process. As part of this continuous improvement effort, staff from Nanyang Polytechnic (NYP) has been assigned the task of applying engineering and analytical techniques to simulate the new process. The simulations were conducted to show on process management and resource planning.

  5. How to Assess the Biomechanical Risk Levels in Beekeeping.

    PubMed

    Maina, G; Rossi, F; Baracco, A

    2016-01-01

    Beekeepers are at particular risk of developing work-related musculoskeletal disorders, but many of the studies lack detailed exposure assessment. To evaluate the biomechanical overload exposure in a specific farming activity, a multitasking model has been developed through the characterization of 37 basic operational tasks typical of the beekeeping activity. The Occupational Repetitive Actions (OCRA) Checklist and the National Institute for Occupational Safety and Health (NIOSH) Lifting Index methodologies have been applied to these elementary tasks to evaluate the exposure, and the resulting risk indices have been time-weighted averaged. Finally, an easy access, computer-assisted toolkit has been developed to help the beekeepers in the biomechanical risk assessment process. The risk of biomechanical overload for the upper limbs ranges from acceptable (maintenance and recovery of woody material and honey packaging with dosing machine tasks) to high (distribution of the top supers) risk level. The risk for back injury is always borderline in women and increases with exposure time, whereas it ranges from acceptable to borderline in men. The definition of the biomechanical risk levels allows for planning of corrective actions aimed at preventing and reducing the risk of musculoskeletal disorders through engineering, administrative, and behavioral interventions. The methodology can be used for risk assessment in other mainly manual agricultural activities.

  6. Payload crew activity planning integration. Task 2: Inflight operations and training for payloads

    NASA Technical Reports Server (NTRS)

    Hitz, F. R.

    1976-01-01

    The primary objectives of the Payload Crew Activity Planning Integration task were to: (1) Determine feasible, cost-effective payload crew activity planning integration methods. (2) Develop an implementation plan and guidelines for payload crew activity plan (CAP) integration between the JSC Orbiter planners and the Payload Centers. Subtask objectives and study activities were defined as: (1) Determine Crew Activity Planning Interfaces. (2) Determine Crew Activity Plan Type and Content. (3) Evaluate Automated Scheduling Tools. (4) Develop a draft Implementation Plan for Crew Activity Planning Integration. The basic guidelines were to develop a plan applicable to the Shuttle operations timeframe, utilize existing center resources and expertise as much as possible, and minimize unnecessary data exchange not directly productive in the development of the end-product timelines.

  7. Measuring information processing in a client with extreme agitation following traumatic brain injury using the Perceive, Recall, Plan and Perform System of Task Analysis.

    PubMed

    Nott, Melissa T; Chapparo, Christine

    2008-09-01

    Agitation following traumatic brain injury is characterised by a heightened state of activity with disorganised information processing that interferes with learning and achieving functional goals. This study aimed to identify information processing problems during task performance of a severely agitated adult using the Perceive, Recall, Plan and Perform (PRPP) System of Task Analysis. Second, this study aimed to examine the sensitivity of the PRPP System to changes in task performance over a short period of rehabilitation, and third, to evaluate the guidance provided by the PRPP in directing intervention. A case study research design was employed. The PRPP System of Task Analysis was used to assess changes in task embedded information processing capacity during occupational therapy intervention with a severely agitated adult in a rehabilitation context. Performance is assessed on three selected tasks over a one-month period. Information processing difficulties during task performance can be clearly identified when observing a severely agitated adult following a traumatic brain injury. Processing skills involving attention, sensory processing and planning were most affected at this stage of rehabilitation. These processing difficulties are linked to established descriptions of agitated behaviour. Fluctuations in performance across three tasks of differing processing complexity were evident, leading to hypothesised relationships between task complexity, environment and novelty with information processing errors. Changes in specific information processing capacity over time were evident based on repeated measures using the PRPP System of Task Analysis. This lends preliminary support for its utility as an outcome measure, and raises hypotheses about the type of therapy required to enhance information processing in people with severe agitation. The PRPP System is sensitive to information processing changes in severely agitated adults when used to reassess performance over short intervals and can provide direct guidance to occupational therapy intervention to improve task embedded information processing by categorising errors under four stages of an information processing model: Perceive, Recall, Plan and Perform.

  8. HRP Integrated Research Plan Analysis

    NASA Technical Reports Server (NTRS)

    Elliott, Todd

    2009-01-01

    The charts, that are the totality of this document, presents tasks, duration of the tasks, the start and finish of the tasks, and subtasks. Also presented are PERT charts that display the beginning, external milestones, and end points for the tasks, and sub tasks.

  9. Planning for Large Scale Habitat Restoration in the Socorro Valley, New Mexico

    Treesearch

    Gina Dello Russo; Yasmeen Najmi

    2006-01-01

    One initiative for large scale habitat restoration on the Rio Grande in central New Mexico is being led by a nonprofit organization, the Save Our Bosque Task Force. The Task Force has just completed a conceptual restoration plan for a 72-kilometer reach of river. The goals of the plan were to determine the potential for enhanced biological diversity through improved...

  10. Operate A Chemical Surety Program And Studies Supporting The Medical Chemical Defense Research Program

    DTIC Science & Technology

    2010-05-01

    23 Task Execution Plan 34 – Temperature Testing of Pyridostigmine Bromide (PB) .......... 23 KEY RESEARCH ACCOMPLISHMENTS...29, 2010. Staff was assembled and materials have been ordered. Task Execution Plan (TEP) 0034 – Temperature Testing of Pyridostigmine Bromide

  11. Opening

    ScienceCinema

    Bruning, Oliver

    2018-05-23

    Overview of the operation and upgrade plans for the machine. Upgrade studies and taskforces. The Chamonix 2010 discussions led to five new task forces: planning for a long shut down in 2012 for splice consolidation; long term consolidation planning for the injector complex; SPS upgrade task force (accelerated program for SPS upgrade); PSB upgrade and its implications for the PS (e.g. radiation etc.); LHC High Luminosity project (investigate planning for ONE upgrade by 2018-2020); Launch of a dedicated study for doubling the beam energy in the LHC->HE-LHC.

  12. Task path planning, scheduling and learning for free-ranging robot systems

    NASA Technical Reports Server (NTRS)

    Wakefield, G. Steve

    1987-01-01

    The development of robotics applications for space operations is often restricted by the limited movement available to guided robots. Free ranging robots can offer greater flexibility than physically guided robots in these applications. Presented here is an object oriented approach to path planning and task scheduling for free-ranging robots that allows the dynamic determination of paths based on the current environment. The system also provides task learning for repetitive jobs. This approach provides a basis for the design of free-ranging robot systems which are adaptable to various environments and tasks.

  13. Test/QA plan for the verification testing of selective catalytic reduction control technologies for highway, nonroad use heavy-duty diesel engines

    EPA Science Inventory

    This ETV test/QA plan for heavy-duty diesel engine testing at the Southwest Research Institute’s Department of Emissions Research (DER) describes how the Federal Test Procedure (FTP), as listed in 40 CFR Part 86 for highway engines and 40 CFR Part 89 for nonroad engines, will be ...

  14. Academic Instruction with the Visible V-8 Engine. The Coordinated Correlated Instructional Program.

    ERIC Educational Resources Information Center

    Davis, W. J.

    The book presents three 93-day lesson plans to motivate and teach handicapped secondary students basic academic skills in reading and language arts, English, and mathematics in conjunction with learning about automobile engines from Revell's Visible V8 Engine Kit. Each lesson plan is correlated with the Visible V8 Engine Kit and includes daily…

  15. 40 CFR Appendix A to Subpart G of... - Sampling Plans for Selective Enforcement Auditing of Marine Engines

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Enforcement Auditing of Marine Engines A Appendix A to Subpart G of Part 91 Protection of Environment...-IGNITION ENGINES Selective Enforcement Auditing Regulations Pt. 91, Subpt. G, App. A Appendix A to Subpart G of Part 91—Sampling Plans for Selective Enforcement Auditing of Marine Engines Table 1—Sampling...

  16. 40 CFR Appendix A to Subpart F of... - Sampling Plans for Selective Enforcement Auditing of Nonroad Engines

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Enforcement Auditing of Nonroad Engines A Appendix A to Subpart F of Part 89 Protection of Environment... NONROAD COMPRESSION-IGNITION ENGINES Selective Enforcement Auditing Pt. 89, Subpt. F, App. A Appendix A to Subpart F of Part 89—Sampling Plans for Selective Enforcement Auditing of Nonroad Engines Table 1—Sampling...

  17. 40 CFR Appendix A to Subpart G of... - Sampling Plans for Selective Enforcement Auditing of Marine Engines

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Enforcement Auditing of Marine Engines A Appendix A to Subpart G of Part 91 Protection of Environment...-IGNITION ENGINES Selective Enforcement Auditing Regulations Pt. 91, Subpt. G, App. A Appendix A to Subpart G of Part 91—Sampling Plans for Selective Enforcement Auditing of Marine Engines Table 1—Sampling...

  18. 40 CFR Appendix A to Subpart F of... - Sampling Plans for Selective Enforcement Auditing of Small Nonroad Engines

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Enforcement Auditing of Small Nonroad Engines A Appendix A to Subpart F of Part 90 Protection of Environment...-IGNITION ENGINES AT OR BELOW 19 KILOWATTS Selective Enforcement Auditing Pt. 90, Subpt. F, App. A Appendix A to Subpart F of Part 90—Sampling Plans for Selective Enforcement Auditing of Small Nonroad Engines...

  19. Development of Management Metrics for Research and Technology

    NASA Technical Reports Server (NTRS)

    Sheskin, Theodore J.

    2003-01-01

    Professor Ted Sheskin from CSU will be tasked to research and investigate metrics that can be used to determine the technical progress for advanced development and research tasks. These metrics will be implemented in a software environment that hosts engineering design, analysis and management tools to be used to support power system and component research work at GRC. Professor Sheskin is an Industrial Engineer and has been involved in issues related to management of engineering tasks and will use his knowledge from this area to allow extrapolation into the research and technology management area. Over the course of the summer, Professor Sheskin will develop a bibliography of management papers covering current management methods that may be applicable to research management. At the completion of the summer work we expect to have him recommend a metric system to be reviewed prior to implementation in the software environment. This task has been discussed with Professor Sheskin and some review material has already been given to him.

  20. Geomatics, Support for an Efficient Urban Planning

    NASA Astrophysics Data System (ADS)

    Moscovici, Anca-Maria; Grecea, Carmen

    2017-10-01

    Geomatics represents a natural consequence of the accelerated development of information technology; it’s a combination of the basic concepts of Geodesy and Geoinformation and encompasses a wide range of the fields, including tools and techniques used in surveying, mapping, remote sensing, Geographic information systems (GIS), global navigation systems by satellite (GPS), geography, planning and decision making in almost all areas: infrastructure, environment, demography, urbanism, health, sociology, economics, tourism, administration, transportation and many others. As a consequence of the population growth and industrialization, society has become more complex for government and other institutions, with the result that more complex and complicated tasks have to be performed. In order to solve these tasks properly, more and more information is required. Having passed through the stages of agricultural and industrial societies, we now live in an information society. Town planning cadastre defines itself as a particular cadastre, a part of the general one, which involves inventory and systematic evidence of the buildings, fields, networks and utilities inside towns. All these problems regard both technical and economic aspects. In order to automate cadastral activity, the first important procedure is to collect all physical information from a certain territory, which will supply later on the database for town cadastre. Geodetic activity for engineering projects is able to provide accurate solutions for positioning, setting out, control, mapping in order to cover basic needs of land administrative information and decision making for the local authorities. The paper points out the purpose and the importance of town planning cadastre for providing the exact data on the situation of the urban fond in order to identify its needs; it presents the case of Timisoara city located in the western side of Romania that has been chosen as the European Capital of Culture for 2021. As a national strategy, a key component in the policies of growth poles is promoting urban development as part of a long-term project with sustainable impact on economic, cultural and social development.

Top