Sample records for engineering teams appropriately

  1. Building an Undergraduate STEM Team Using Team-Based Learning Leading to the Production of a Storyboard Appropriate for Elementary Students

    ERIC Educational Resources Information Center

    Cutright, Teresa J.; Evans, Edward; Brantner, Justin S.

    2014-01-01

    A unique undergraduate team that spans five different engineering disciplines, chemistry, biology, and mathematics was formed. The team was formed to promote cross-disciplinary learning, to improve retention, and to prepare the students for the kind of problems they will face in their careers. This paper describes the variety of activities used…

  2. Optical engineering capstone design projects with industry sponsors

    NASA Astrophysics Data System (ADS)

    Bunch, Robert M.; Leisher, Paul O.; Granieri, Sergio C.

    2014-09-01

    Capstone senior design is the culmination of a student's undergraduate engineering education that prepares them for engineering practice. In fact, any engineering degree program that pursues accreditation by the Engineering Accreditation Commission of ABET must contain "a major design experience based on the knowledge and skills acquired in earlier course work and incorporating appropriate engineering standards and multiple realistic constraints." At Rose-Hulman, we offer an interdisciplinary Optical Engineering / Engineering Physics senior design curriculum that meets this requirement. Part of this curriculum is a two-course sequence where students work in teams on a design project leading to a functional prototype. The students begin work on their capstone project during the first week of their senior year. The courses are deliverable-driven and the students are held accountable for regular technical progress through weekly updates with their faculty advisor and mid-term design reviews. We have found that client-sponsored projects offer students an enriched engineering design experience as it ensures consideration of constraints and standards requirements similar to those that they will encounter as working engineers. Further, client-sponsored projects provide teams with an opportunity for regular customer interactions which help shape the product design. The process that we follow in both soliciting and helping to scope appropriate industry-related design projects will be described. In addition, an outline of the capstone course structure as well as methods used to hold teams accountable for technical milestones will be discussed. Illustrative examples of past projects will be provided.

  3. A Matrix Approach to Software Process Definition

    NASA Technical Reports Server (NTRS)

    Schultz, David; Bachman, Judith; Landis, Linda; Stark, Mike; Godfrey, Sally; Morisio, Maurizio; Powers, Edward I. (Technical Monitor)

    2000-01-01

    The Software Engineering Laboratory (SEL) is currently engaged in a Methodology and Metrics program for the Information Systems Center (ISC) at Goddard Space Flight Center (GSFC). This paper addresses the Methodology portion of the program. The purpose of the Methodology effort is to assist a software team lead in selecting and tailoring a software development or maintenance process for a specific GSFC project. It is intended that this process will also be compliant with both ISO 9001 and the Software Engineering Institute's Capability Maturity Model (CMM). Under the Methodology program, we have defined four standard ISO-compliant software processes for the ISC, and three tailoring criteria that team leads can use to categorize their projects. The team lead would select a process and appropriate tailoring factors, from which a software process tailored to the specific project could be generated. Our objective in the Methodology program is to present software process information in a structured fashion, to make it easy for a team lead to characterize the type of software engineering to be performed, and to apply tailoring parameters to search for an appropriate software process description. This will enable the team lead to follow a proven, effective software process and also satisfy NASA's requirement for compliance with ISO 9001 and the anticipated requirement for CMM assessment. This work is also intended to support the deployment of sound software processes across the ISC.

  4. Cleanroom Software Engineering Reference Model. Version 1.0.

    DTIC Science & Technology

    1996-11-01

    teams. It also serves as a baseline for continued evolution of Cleanroom practice. The scope of the CRM is software management , specification...addition to project staff, participants include management , peer organization representatives, and customer representatives as appropriate for...2 Review the status of the process with management , the project team, peer groups, and the customer . These verification activities include

  5. Extraterrestrial surface propulsion systems

    NASA Astrophysics Data System (ADS)

    Ash, Robert L.; Blackstock, Dexter L.; Barnhouse, K.; Charalambous, Z.; Coats, J.; Danagan, J.; Davis, T.; Dickens, J.; Harris, P.; Horner, G.

    Lunar traction systems, Mars oxygen production, and Mars methane engine operation were the three topics studied during 1992. An elastic loop track system for lunar construction operations was redesigned and is being tested. A great deal of work on simulating the lunar environment to facilitate traction testing has been reported. Operation of an oxygen processor under vacuum conditions has been the focus of another design team. They have redesigned the processor facility. This included improved seals and heat shields. Assuming methane and oxygen can be produced from surface resources on Mars, a third design team has addressed the problem of using Mars atmospheric carbon dioxide to control combustion temperatures in an internal combustion engine. That team has identified appropriate tests and instrumentation. They have reported on the test rig that they designed and the computer-based system for acquiring data.

  6. Extraterrestrial surface propulsion systems

    NASA Technical Reports Server (NTRS)

    Ash, Robert L.; Blackstock, Dexter L.; Barnhouse, K.; Charalambous, Z.; Coats, J.; Danagan, J.; Davis, T.; Dickens, J.; Harris, P.; Horner, G.

    1992-01-01

    Lunar traction systems, Mars oxygen production, and Mars methane engine operation were the three topics studied during 1992. An elastic loop track system for lunar construction operations was redesigned and is being tested. A great deal of work on simulating the lunar environment to facilitate traction testing has been reported. Operation of an oxygen processor under vacuum conditions has been the focus of another design team. They have redesigned the processor facility. This included improved seals and heat shields. Assuming methane and oxygen can be produced from surface resources on Mars, a third design team has addressed the problem of using Mars atmospheric carbon dioxide to control combustion temperatures in an internal combustion engine. That team has identified appropriate tests and instrumentation. They have reported on the test rig that they designed and the computer-based system for acquiring data.

  7. Software Program: Software Management Guidebook

    NASA Technical Reports Server (NTRS)

    1996-01-01

    The purpose of this NASA Software Management Guidebook is twofold. First, this document defines the core products and activities required of NASA software projects. It defines life-cycle models and activity-related methods but acknowledges that no single life-cycle model is appropriate for all NASA software projects. It also acknowledges that the appropriate method for accomplishing a required activity depends on characteristics of the software project. Second, this guidebook provides specific guidance to software project managers and team leaders in selecting appropriate life cycles and methods to develop a tailored plan for a software engineering project.

  8. Use of activity theory-based need finding for biomedical device development.

    PubMed

    Rismani, Shalaleh; Ratto, Matt; Machiel Van der Loos, H F

    2016-08-01

    Identifying the appropriate needs for biomedical device design is challenging, especially for less structured environments. The paper proposes an alternate need-finding method based on Cultural Historical Activity Theory and expanded to explicitly examine the role of devices within a socioeconomic system. This is compared to a conventional need-finding technique in a preliminary study with engineering student teams. The initial results show that the Activity Theory-based technique allows teams to gain deeper insights into their needs space.

  9. NASA systems engineering handbook

    NASA Astrophysics Data System (ADS)

    Shishko, Robert; Aster, Robert; Chamberlain, Robert G.; McDuffee, Patrick; Pieniazek, Les; Rowell, Tom; Bain, Beth; Cox, Renee I.; Mooz, Harold; Polaski, Lou

    1995-06-01

    This handbook brings the fundamental concepts and techniques of systems engineering to NASA personnel in a way that recognizes the nature of NASA systems and environment. It is intended to accompany formal NASA training courses on systems engineering and project management when appropriate, and is designed to be a top-level overview. The concepts were drawn from NASA field center handbooks, NMI's/NHB's, the work of the NASA-wide Systems Engineering Working Group and the Systems Engineering Process Improvement Task team, several non-NASA textbooks and guides, and material from independent systems engineering courses taught to NASA personnel. Five core chapters cover systems engineering fundamentals, the NASA Project Cycle, management issues in systems engineering, systems analysis and modeling, and specialty engineering integration. It is not intended as a directive.

  10. Pediatric medical device development by surgeons via capstone engineering design programs.

    PubMed

    Sack, Bryan S; Elizondo, Rodolfo A; Huang, Gene O; Janzen, Nicolette; Espinoza, Jimmy; Sanz-Cortes, Magdalena; Dietrich, Jennifer E; Hakim, Julie; Richardson, Eric S; Oden, Maria; Hanks, John; Haridas, Balakrishna; Hury, James F; Koh, Chester J

    2018-03-01

    There is a need for pediatric medical devices that accommodate the unique physiology and anatomy of pediatric patients that is increasingly receiving more attention. However, there is limited literature on the programs within children's hospitals and academia that can support pediatric device development. We describe our experience with pediatric device design utilizing collaborations between a children's hospital and two engineering schools. Utilizing the academic year as a timeline, unmet pediatric device needs were identified by surgical faculty and matched with an engineering mentor and a team of students within the Capstone Engineering Design programs at two universities. The final prototypes were showcased at the end of the academic year and if appropriate, provisional patent applications were filed. All twelve teams successfully developed device prototypes, and five teams obtained provisional patents. The prototypes that obtained provisional patents included a non-operative ureteral stent removal system, an evacuation device for small kidney stone fragments, a mechanical leech, an anchoring system of the chorio-amniotic membranes during fetal surgery, and a fetal oxygenation monitor during fetoscopic procedures. Capstone Engineering Design programs in partnership with surgical faculty at children's hospitals can play an effective role in the prototype development of novel pediatric medical devices. N/A - No clinical subjects or human testing was performed. Copyright © 2017 Elsevier Inc. All rights reserved.

  11. Systematic Method for Establishing Officer Grade Requirements Based Upon Job Demands.

    ERIC Educational Resources Information Center

    Christal, Raymond E.

    This report presents interim results of a study developing a methodology for management engineering teams to determine the appropriate grade requirements for officer positions based on job content and responsibilities. The technology reported represents a modification and extension of methods developed between 1963 and 1966. Results indicated that…

  12. NASA Systems Engineering Handbook

    NASA Technical Reports Server (NTRS)

    Shishko, Robert; Aster, Robert; Chamberlain, Robert G.; Mcduffee, Patrick; Pieniazek, Les; Rowell, Tom; Bain, Beth; Cox, Renee I.; Mooz, Harold; Polaski, Lou

    1995-01-01

    This handbook brings the fundamental concepts and techniques of systems engineering to NASA personnel in a way that recognizes the nature of NASA systems and environment. It is intended to accompany formal NASA training courses on systems engineering and project management when appropriate, and is designed to be a top-level overview. The concepts were drawn from NASA field center handbooks, NMI's/NHB's, the work of the NASA-wide Systems Engineering Working Group and the Systems Engineering Process Improvement Task team, several non-NASA textbooks and guides, and material from independent systems engineering courses taught to NASA personnel. Five core chapters cover systems engineering fundamentals, the NASA Project Cycle, management issues in systems engineering, systems analysis and modeling, and specialty engineering integration. It is not intended as a directive. Superseded by: NASA/SP-2007-6105 Rev 1 (20080008301).

  13. Surface contamination analysis technology team overview

    NASA Technical Reports Server (NTRS)

    Burns, H. Dewitt

    1995-01-01

    A team was established which consisted of representatives from NASA (Marshall Space Flight Center and Langley Research Center), Thiokol Corporation, the University of Alabama in Huntsville, AC Engineering, SAIC, Martin Marietta, and Aerojet. The team's purpose was to bring together the appropriate personnel to determine what surface inspection techniques were applicable to multiprogram bonding surface cleanliness inspection. In order to identify appropriate techniques and their sensitivity to various contaminant families, calibration standards were developed. Producing standards included development of consistent low level contamination application techniques. Oxidation was also considered for effect on inspection equipment response. Ellipsometry was used for oxidation characterization. Verification testing was then accomplished to show that selected inspection techniques could detect subject contaminants at levels found to be detrimental to critical bond systems of interest. Once feasibility of identified techniques was shown, selected techniques and instrumentation could then be incorporated into a multipurpose inspection head and integrated with a robot for critical surface inspection. Inspection techniques currently being evaluated include optically stimulated electron emission (OSEE); near infrared (NIR) spectroscopy utilizing fiber optics; Fourier transform infrared (FTIR) spectroscopy; and ultraviolet (UV) fluorescence. Current plans are to demonstrate an integrated system in MSFC's Productivity Enhancement Complex within five years from initiation of this effort in 1992 assuming appropriate funding levels are maintained. This paper gives an overview of work accomplished by the team and future plans.

  14. Building an Undergraduate STEM Team Using Team-Based Learning Leading to the Production of a Storyboard Appropriate for Elementary Students

    NASA Astrophysics Data System (ADS)

    Cutright, Teresa J.; Evans, Edward; Brantner, Justin S.

    2014-06-01

    A unique undergraduate team that spans five different engineering disciplines, chemistry, biology, and mathematics was formed. The team was formed to promote cross-disciplinary learning, to improve retention, and to prepare the students for the kind of problems they will face in their careers. This paper describes the variety of activities used over 2 years to tie the team together, as well as afford opportunities to develop team-building skills. The activities described highlight the critical elements of a faculty leader whose own work is interdisciplinary, correct balance of disciplines in the team, and sufficient time for team development. The use of external feedback was essential for all activities. Clearly defined goals and hard deadlines were critical for the completion of individual activities, as well as developing a healthy team environment. Although the student cohort has learned from the activities, more time is needed to assess whether the students have become a fully efficient team. Furthermore, an additional cohort would be needed to assess whether the approach was able to assist with student's interest in STEM and their desire to help other people.

  15. Perceptions of Engineers Regarding Successful Engineering Team Design

    NASA Technical Reports Server (NTRS)

    Nowaczyk, Ronald H.

    1998-01-01

    The perceptions of engineers and scientists at NASA Langley Research Center toward engineering design teams were evaluated. A sample of 49 engineers and scientists rated 60 team behaviors in terms of their relative importance for team success. They also completed a profile of their own perceptions of their strengths and weaknesses as team members. Behaviors related to team success are discussed in terms of those involving the organizational culture and commitment to the team and those dealing with internal team dynamics. The latter behaviors focused on team issues occurring during the early stages of a team's existence. They included the level and extent of debate and discussion regarding methods for completing the team task and the efficient use of team time to explore and discuss methodologies critical to the problem. The discussion includes a comparison of engineering teams with the prototypical business team portrayed in the literature.

  16. Behind the scenes: A medical natural language processing project.

    PubMed

    Wu, Joy T; Dernoncourt, Franck; Gehrmann, Sebastian; Tyler, Patrick D; Moseley, Edward T; Carlson, Eric T; Grant, David W; Li, Yeran; Welt, Jonathan; Celi, Leo Anthony

    2018-04-01

    Advancement of Artificial Intelligence (AI) capabilities in medicine can help address many pressing problems in healthcare. However, AI research endeavors in healthcare may not be clinically relevant, may have unrealistic expectations, or may not be explicit enough about their limitations. A diverse and well-functioning multidisciplinary team (MDT) can help identify appropriate and achievable AI research agendas in healthcare, and advance medical AI technologies by developing AI algorithms as well as addressing the shortage of appropriately labeled datasets for machine learning. In this paper, our team of engineers, clinicians and machine learning experts share their experience and lessons learned from their two-year-long collaboration on a natural language processing (NLP) research project. We highlight specific challenges encountered in cross-disciplinary teamwork, dataset creation for NLP research, and expectation setting for current medical AI technologies. Copyright © 2017. Published by Elsevier B.V.

  17. Contextual Shaping of Student Design Practices: The Role of Constraint in First-Year Engineering Design

    NASA Astrophysics Data System (ADS)

    Goncher, Andrea M.

    thResearch on engineering design is a core area of concern within engineering education, and a fundamental understanding of how engineering students approach and undertake design is necessary in order to develop effective design models and pedagogies. This dissertation contributes to scholarship on engineering design by addressing a critical, but as yet underexplored, problem: how does the context in which students design shape their design practices? Using a qualitative study comprising of video data of design sessions, focus group interviews with students, and archives of their design work, this research explored how design decisions and actions are shaped by context, specifically the context of higher education. To develop a theoretical explanation for observed behavior, this study used the nested structuration. framework proposed by Perlow, Gittell, & Katz (2004). This framework explicated how teamwork is shaped by mutually reinforcing relationships at the individual, organizational, and institutional levels. I appropriated this framework to look specifically at how engineering students working on a course-related design project identify constraints that guide their design and how these constraints emerge as students interact while working on the project. I first identified and characterized the parameters associated with the design project from the student perspective and then, through multi-case studies of four design teams, I looked at the role these parameters play in student design practices. This qualitative investigation of first-year engineering student design teams revealed mutual and interconnected relationships between students and the organizations and institutions that they are a part of. In addition to contributing to research on engineering design, this work provides guidelines and practices to help design educators develop more effective design projects by incorporating constraints that enable effective design and learning. Moreover, I found that when appropriated in the context of higher education, multiple sublevels existed within nested structuration's organizational context and included course-level and project-level factors. The implications of this research can be used to improve the design of engineering course projects as well as the design of research efforts related to design in engineering education.

  18. 76 FR 10403 - Hewlett Packard (HP), Global Product Development, Engineering Workstation Refresh Team, Working...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-24

    ...), Global Product Development, Engineering Workstation Refresh Team, Working On-Site at General Motors... groups: The Non-Information Technology Business Development Team, the Engineering Application Support Team, and the Engineering Workstation Refresh Team. On February 2, 2011, the Department issued an...

  19. Social Network Theory in Engineering Education

    NASA Astrophysics Data System (ADS)

    Simon, Peter A.

    Collaborative groups are important both in the learning environment of engineering education and, in the real world, the business of engineering design. Selecting appropriate individuals to form an effective group and monitoring a group's progress are important aspects of successful task performance. This exploratory study looked at using the concepts of cognitive social structures, structural balance, and centrality from social network analysis as well as the measures of emotional intelligence. The concepts were used to analyze potential team members to examine if an individual's ability to perceive emotion in others and the self and to use, understand, and manage those emotions are a factor in a group's performance. The students from a capstone design course in computer engineering were used as volunteer subjects. They were formed into groups and assigned a design exercise to determine whether and which of the above-mentioned tools would be effective in both selecting teams and predicting the quality of the resultant design. The results were inconclusive with the exception of an individual's ability to accurately perceive emotions. The instruments that were successful were the Self-Monitoring scale and the accuracy scores derived from cognitive social structures and Level IV of network levels of analysis.

  20. Factors Related to Successful Engineering Team Design

    NASA Technical Reports Server (NTRS)

    Nowaczyk, Ronald H.; Zang, Thomas A.

    1998-01-01

    The perceptions of a sample of 49 engineers and scientists from NASA Langley Research Center toward engineering design teams were evaluated. The respondents rated 60 team behaviors in terms of their relative importance for team success. They also completed a profile of their own perceptions of their strengths and weaknesses as team members. Behaviors related to team success are discussed in terms of those involving the organizational culture and commitment to the team and those dealing with internal team dynamics. The latter behaviors included the level and extent of debate and discussion regarding methods for completing the team task and the efficient use of team time to explore and discuss methodologies critical to the problem. Successful engineering teams may find their greatest challenges occurring during the early stages of their existence. In contrast to the prototypical business team, members on an engineering design share expertise and knowledge which allows them to deal with task issues sooner. However, discipline differences among team members can lead to conflicts regarding the best method or approach to solving the engineering problem.

  1. Consequences of Team Charter Quality: Teamwork Mental Model Similarity and Team Viability in Engineering Design Student Teams

    ERIC Educational Resources Information Center

    Conway Hughston, Veronica

    2014-01-01

    Since 1996 ABET has mandated that undergraduate engineering degree granting institutions focus on learning outcomes such as professional skills (i.e. solving unstructured problems and working in teams). As a result, engineering curricula were restructured to include team based learning--including team charters. Team charters were diffused into…

  2. Teaching Engineering Students Team Work

    NASA Technical Reports Server (NTRS)

    Levi, Daniel

    1998-01-01

    The purpose of this manual is to provide professor's in engineering classes which the background necessary to use student team projects effectively. This manual describes some of the characteristics of student teams and how to use them in class. It provides a set of class activities and films which can be used to introduce and support student teams. Finally, a set of teaching modules used in freshmen, sophomore, and senior aeronautical engineering classes are presented. This manual was developed as part of a NASA sponsored project to improve the undergraduate education of aeronautical engineers. The project has helped to purchase a set of team work films which can be checked out from Cal Poly's Learning Resources Center in the Kennedy Library. Research for this project has included literature reviews on team work and cooperative learning; interviews, observations, and surveys of Cal Poly students from Industrial and Manufacturing Engineering, Aeronautical Engineering and Psychology; participation in the Aeronautical Engineering senior design lab; and interviews with engineering faculty. In addition to this faculty manual, there is a student team work manual which has been designed to help engineering students work better in teams.

  3. Managing the replacement cycle of laser inventory.

    PubMed

    Davis, C E

    1992-01-01

    Medical lasers are quickly moving into the replacement phase of technology management. Barnes Hospital (St. Louis, MO) is using its laser team to define a process of planned laser replacement using the experience gained from traditional medical equipment replacement cycles, quality improvement principles and tools, and other formalized interdisciplinary teams. The process described in this paper has six basic steps: (1) A decision is made to request a replacement laser. (2) An appropriation request form is completed and submitted with the clinical and/or technical justifications. (3) Those requests initiated outside of the Clinical Engineering Department are reviewed by the Clinical Engineer/Medical Laser Safety Officer (CE/MLSO). (4) The CE/MLSO presents the requests to the hospital Laser Committee, and (5) then to the Laser Users' Group. (6) Finally, an Expenditure Authorization Committee reviews all capital expense requests, including those for replacement lasers, and allocates funds for the next fiscal year. This paper illustrates and evaluates the process, using an example from the review process for 1993 equipment purchases at Barnes Hospital.

  4. Biomedical engineering education through global engineering teams.

    PubMed

    Scheffer, C; Blanckenberg, M; Garth-Davis, B; Eisenberg, M

    2012-01-01

    Most industrial projects require a team of engineers from a variety of disciplines. The team members are often culturally diverse and geographically dispersed. Many students do not acquire sufficient skills from typical university courses to function efficiently in such an environment. The Global Engineering Teams (GET) programme was designed to prepare students such a scenario in industry. This paper discusses five biomedical engineering themed projects completed by GET students. The benefits and success of the programme in educating students in the field of biomedical engineering are discussed.

  5. Consequences of team charter quality: Teamwork mental model similarity and team viability in engineering design student teams

    NASA Astrophysics Data System (ADS)

    Conway Hughston, Veronica

    Since 1996 ABET has mandated that undergraduate engineering degree granting institutions focus on learning outcomes such as professional skills (i.e. solving unstructured problems and working in teams). As a result, engineering curricula were restructured to include team based learning---including team charters. Team charters were diffused into engineering education as one of many instructional activities to meet the ABET accreditation mandates. However, the implementation and execution of team charters into engineering team based classes has been inconsistent and accepted without empirical evidence of the consequences. The purpose of the current study was to investigate team effectiveness, operationalized as team viability, as an outcome of team charter implementation in an undergraduate engineering team based design course. Two research questions were the focus of the study: a) What is the relationship between team charter quality and viability in engineering student teams, and b) What is the relationship among team charter quality, teamwork mental model similarity, and viability in engineering student teams? Thirty-eight intact teams, 23 treatment and 15 comparison, participated in the investigation. Treatment teams attended a team charter lecture, and completed a team charter homework assignment. Each team charter was assessed and assigned a quality score. Comparison teams did not join the lecture, and were not asked to create a team charter. All teams completed each data collection phase: a) similarity rating pretest; b) similarity posttest; and c) team viability survey. Findings indicate that team viability was higher in teams that attended the lecture and completed the charter assignment. Teams with higher quality team charter scores reported higher levels of team viability than teams with lower quality charter scores. Lastly, no evidence was found to support teamwork mental model similarity as a partial mediator of the team charter quality on team viability relationship. Foci for future research opportunities include using: a) online data collection methods to improve participant adherence to similarity rating instructions; b) story or narratives during pre- and posttest similarity rating data collection to create common levels of contextual perception; and c) support to ensure charters are integrated into the full project life cycle, not just a pre-project one time isolated activity. Twenty five sections, on average, of EDSGN 100 are taught each spring and fall semester. Consistent instructor expectations are set for the technical aspects of the course. However, ideas to foster team effectiveness are often left to the discretion of the individual instructor. Implementing empirically tested team effectiveness instructional activities would bring consistency to EDGSN 100 curriculum. Other instructional activities that would be of benefit to engineering educators include qualitative inquiry---asking intrateam process questions (at the mid-point of the project) and in-class reflection---dedicated time, post project, to discuss what went well/not well within the team.

  6. Seven ways to make a hypertext project fail

    NASA Technical Reports Server (NTRS)

    Glushko, Robert J.

    1990-01-01

    Hypertext is an exciting concept, but designing and developing hypertext applications of practical scale is hard. To make a project feasible and successful 'hypertext engineers' must overcome the following problems: (1) developing realistic expectations in the face of hypertext hype; (2) assembling a multidisciplinary project team; (3) establishing and following design guidelines; (4) dealing with installed base constraints; (5) obtaining usable source files; (6) finding appropriate software technology and methods; and (7) overcoming legal uncertainties about intellectual property concerns.

  7. SimBRS: A University/Industry Consortium Focused on Simulation Based Solutions for Ground Vehicles

    DTIC Science & Technology

    2009-07-29

    plan is to use the SimBRS contract mechanism to streamline a process that applies research funds into a managed program, that is cognizant to the... designs . Therefore, the challenge for the SimBRS team is to establish an approach based on the capacity of measured data and simulations to support ...by systematically relating appropriate results from measurements and applied research in engineering and science. In turn, basic research and

  8. Collaborative Systems Thinking: A Response to the Problems Faced by Systems Engineering's 'Middle Tier'

    NASA Technical Reports Server (NTRS)

    Phfarr, Barbara B.; So, Maria M.; Lamb, Caroline Twomey; Rhodes, Donna H.

    2009-01-01

    Experienced systems engineers are adept at more than implementing systems engineering processes: they utilize systems thinking to solve complex engineering problems. Within the space industry demographics and economic pressures are reducing the number of experienced systems engineers that will be available in the future. Collaborative systems thinking within systems engineering teams is proposed as a way to integrate systems engineers of various experience levels to handle complex systems engineering challenges. This paper uses the GOES-R Program Systems Engineering team to illustrate the enablers and barriers to team level systems thinking and to identify ways in which performance could be improved. Ways NASA could expand its engineering training to promote team-level systems thinking are proposed.

  9. Characterizing Distributed Concurrent Engineering Teams: A Descriptive Framework for Aerospace Concurrent Engineering Design Teams

    NASA Technical Reports Server (NTRS)

    Chattopadhyay, Debarati; Hihn, Jairus; Warfield, Keith

    2011-01-01

    As aerospace missions grow larger and more technically complex in the face of ever tighter budgets, it will become increasingly important to use concurrent engineering methods in the development of early conceptual designs because of their ability to facilitate rapid assessments and trades in a cost-efficient manner. To successfully accomplish these complex missions with limited funding, it is also essential to effectively leverage the strengths of individuals and teams across government, industry, academia, and international agencies by increased cooperation between organizations. As a result, the existing concurrent engineering teams will need to increasingly engage in distributed collaborative concurrent design. This paper is an extension of a recent white paper written by the Concurrent Engineering Working Group, which details the unique challenges of distributed collaborative concurrent engineering. This paper includes a short history of aerospace concurrent engineering, and defines the terms 'concurrent', 'collaborative' and 'distributed' in the context of aerospace concurrent engineering. In addition, a model for the levels of complexity of concurrent engineering teams is presented to provide a way to conceptualize information and data flow within these types of teams.

  10. Thermal and Structural Analysis of Micro-Fabricated Involute Regenerators

    NASA Astrophysics Data System (ADS)

    Qiu, Songgang; Augenblick, Jack E.

    2005-02-01

    Long-life, high-efficiency power generators based on free-piston Stirling engines are an energy conversion solution for future space power generation and commercial applications. As part of the efforts to further improve Stirling engine efficiency and reliability, a micro-fabricated, involute regenerator structure is proposed by a Cleveland State University-led regenerator research team. This paper reports on thermal and structural analyses of the involute regenerator to demonstrate the feasibility of the proposed regenerator. The results indicate that the involute regenerator has extremely high axial stiffness to sustain reasonable axial compression forces with negligible lateral deformation. The relatively low radial stiffness may impose some challenges to the appropriate installation of the in-volute regenerators.

  11. Systems Engineering Knowledge Asset (SEKA) Management for Higher Performing Engineering Teams: People, Process and Technology toward Effective Knowledge-Workers

    ERIC Educational Resources Information Center

    Shelby, Kenneth R., Jr.

    2013-01-01

    Systems engineering teams' value-creation for enterprises is slower than possible due to inefficiencies in communication, learning, common knowledge collaboration and leadership conduct. This dissertation outlines the surrounding people, process and technology dimensions for higher performing engineering teams. It describes a true experiment…

  12. Global Engineering Teams--A Programme Promoting Teamwork in Engineering Design and Manufacturing

    ERIC Educational Resources Information Center

    Oladiran, M. T.; Uziak, J.; Eisenberg, M.; Scheffer, C.

    2011-01-01

    Engineering graduates are expected to possess various competencies categorised into hard and soft skills. The hard skills are acquired through specific coursework, but the soft skills are often treated perfunctorily. Global Engineering Teams (GET) is a programme that promotes project-oriented tasks in virtual student teams working in collaboration…

  13. Achieving Maximum Integration Utilizing Requirements Flow Down

    NASA Technical Reports Server (NTRS)

    Archiable, Wes; Askins, Bruce

    2011-01-01

    A robust and experienced systems engineering team is essential for a successful program. It is often a challenge to build a core systems engineering team early enough in a program to maximize integration and assure a common path for all supporting teams in a project. Ares I was no exception. During the planning of IVGVT, the team had many challenges including lack of: early identification of stakeholders, team training in NASA s system engineering practices, solid requirements flow down and a top down documentation strategy. The IVGVT team started test planning early in the program before the systems engineering framework had been matured due to an aggressive schedule. Therefore the IVGVT team increased their involvement in the Constellation systems engineering effort. Program level requirements were established that flowed down to IVGVT aligning all stakeholders to a common set of goals. The IVGVT team utilized the APPEL REQ Development Management course providing the team a NASA focused model to follow. The IVGVT team engaged directly with the model verification and validation process to assure that a solid set of requirements drove the need for the test event. The IVGVT team looked at the initial planning state, analyzed the current state and then produced recommendations for the ideal future state of a wide range of systems engineering functions and processes. Based on this analysis, the IVGVT team was able to produce a set of lessons learned and to provide suggestions for future programs or tests to use in their initial planning phase.

  14. 78 FR 7464 - Large Scale Networking (LSN) ; Joint Engineering Team (JET)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-01

    ... NATIONAL SCIENCE FOUNDATION Large Scale Networking (LSN) ; Joint Engineering Team (JET) AGENCY: The Networking and Information Technology Research and Development (NITRD) National Coordination...://www.nitrd.gov/nitrdgroups/index.php?title=Joint_Engineering_Team_ (JET)#title. SUMMARY: The JET...

  15. Case study: Comparison of motivation for achieving higher performance between self-directed and manager-directed aerospace engineering teams

    NASA Astrophysics Data System (ADS)

    Erlick, Katherine

    "The stereotype of engineers is that they are not people oriented; the stereotype implies that engineers would not work well in teams---that their task emphasis is a solo venture and does not encourage social aspects of collaboration" (Miner & Beyerlein, 1999, p. 16). The problem is determining the best method of providing a motivating environment where design engineers may contribute within a team in order to achieve higher performance in the organization. Theoretically, self-directed work teams perform at higher levels. But, allowing a design engineer to contribute to the team while still maintaining his or her anonymity is the key to success. Therefore, a motivating environment must be established to encourage greater self-actualization in design engineers. The purpose of this study is to determine the favorable motivational environment for design engineers and describe the comparison between two aerospace design-engineering teams: one self-directed and the other manager directed. Following the comparison, this study identified whether self-direction or manager-direction provides the favorable motivational environment for operating as a team in pursuit of achieving higher performance. The methodology used in this research was the case study focusing on the team's levels of job satisfaction and potential for higher performance. The collection of data came from three sources, (a) surveys, (b) researcher observer journal and (c) collection of artifacts. The surveys provided information regarding personal behavior characteristics, potentiality for higher performance and motivational attributes. The researcher journal provided information regarding team dynamics, individual interaction, conflict and conflict resolution. The milestone for performance was based on the collection of artifacts from the two teams. The findings from this study illustrated that whether the team was manager-directed or self-directed does not appear to influence the needs and wants of the team members. The self-directed team was more motivated to learn their topic than was the manager-directed team, but they struggled with their path in following their vision whereas the manager-directed team kept their focus under the guidance of their manager. Finally, both teams are in fact effective; however specific circumstances may be an important objective when deciding to utilize either a self-directed or manager-directed team.

  16. 77 FR 58415 - Large Scale Networking (LSN); Joint Engineering Team (JET)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-20

    ... NATIONAL SCIENCE FOUNDATION Large Scale Networking (LSN); Joint Engineering Team (JET) AGENCY: The Networking and Information Technology Research and Development (NITRD) National Coordination Office (NCO..._Engineering_Team_ (JET). SUMMARY: The JET, established in 1997, provides for information sharing among Federal...

  17. 78 FR 70076 - Large Scale Networking (LSN)-Joint Engineering Team (JET)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-22

    ... NATIONAL SCIENCE FOUNDATION Large Scale Networking (LSN)--Joint Engineering Team (JET) AGENCY: The Networking and Information Technology Research and Development (NITRD) National Coordination Office (NCO..._Engineering_Team_ (JET)#title. SUMMARY: The JET, established in 1997, provides for information sharing among...

  18. A systems engineering initiative for NASA's space communications

    NASA Technical Reports Server (NTRS)

    Hornstein, Rhoda S.; Hei, Donald J., Jr.; Kelly, Angelita C.; Lightfoot, Patricia C.; Bell, Holland T.; Cureton-Snead, Izeller E.; Hurd, William J.; Scales, Charles H.

    1993-01-01

    In addition to but separate from the Red and Blue Teams commissioned by the NASA Administrator, NASA's Associate Administrator for Space Communications commissioned a Blue Team to review the Office of Space Communications (Code O) Core Program and determine how the program could be conducted faster, better, and cheaper, without compromising safety. Since there was no corresponding Red Team for the Code O Blue Team, the Blue Team assumed a Red Team independent attitude and challenged the status quo. The Blue Team process and results are summarized. The Associate Administrator for Space Communications subsequently convened a special management session to discuss the significance and implications of the Blue Team's report and to lay the groundwork and teamwork for the next steps, including the transition from engineering systems to systems engineering. The methodology and progress toward realizing the Code O Family vision and accomplishing the systems engineering initiative for NASA's space communications are presented.

  19. First-Year Engineering Students' Portrayal of Engineering in a Proposed Museum Exhibit for Middle School Students

    NASA Astrophysics Data System (ADS)

    Mena, Irene B.; Diefes-Dux, Heidi A.

    2012-04-01

    Students' perceptions of engineering have been documented through studies involving interviews, surveys, and word associations that take a direct approach to asking students about various aspects of their understanding of engineering. Research on perceptions of engineering rarely focuses on how students would portray engineering to others. First-year engineering student teams proposed a museum exhibit, targeted to middle school students, to explore the question "What is engineering?" The proposals took the form of a poster. The overarching research question focuses on how these students would portray engineering to middle school students as seen through their museum exhibit proposals. A preliminary analysis was done on 357 posters to determine the overall engineering themes for the proposed museum exhibits. Forty of these posters were selected and, using open coding, more thoroughly analyzed to learn what artifacts/objects, concepts, and skills student teams associate with engineering. These posters were also analyzed to determine if there were any differences by gender composition of the student teams. Building, designing, and teamwork are skills the first-year engineering students link to engineering. Regarding artifacts, students mentioned those related to transportation and structures most often. All-male teams were more likely to focus on the idea of space and to mention teamwork and designing as engineering skills; equal-gender teams were more likely to focus on the multidisciplinary aspect of engineering. This analysis of student teams' proposals provides baseline data, positioning instructors to develop and assess instructional interventions that stretch students' self-exploration of engineering.

  20. Energy and American values

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Barbour, I.; Brooks, H.; Lakoff, S.

    A multi-disciplinary team consisting of an engineer, a political scientist, an historian, and a professor of religion and physics view the question of energy and values from each other's perspective. The result is a synthesis of the team's views on all aspects of energy technology and how it affects human life in general as well as the lives of different classes and specific groups in our society. It begins with an historic overview of the way an abundance of energy has shaped America's use of it. It continues by considering the energy debate as a conflict between Jeffersonians who believemore » in decentralized, appropriate technology and the centralized, efficient technology of Hamiltonians. The authors wrestle with regional and geographical differences in energy resources, environmental impacts, and ethical problems. 384 references.« less

  1. 78 FR 31592 - T-Mobile Usa, Inc., Core Fault Isolation Team, Engineering Division, Bethlehem, Pennsylvania...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-24

    ... DEPARTMENT OF LABOR Employment and Training Administration [TA-W-82,371] T-Mobile Usa, Inc., Core Fault Isolation Team, Engineering Division, Bethlehem, Pennsylvania; Notice of Affirmative Determination...., Core Fault Isolation Team, Engineering Division, Bethlehem, Pennsylvania (subject firm). The...

  2. Training to Enhance Design Team Performance: A Cure for Tunnel Vision

    NASA Technical Reports Server (NTRS)

    Parker, James W.; Parker, Nelson C. (Technical Monitor)

    2001-01-01

    Design Team performance is a function of the quality and degree of academic training and the cumulative, learned experience of the individual members of the team. Teamwork, leadership, and communications certainly are factors that affect the measure of the performance of the team, but they are not addressed here. This paper focuses on accelerating the learned experience of team members and describes an organizational approach that can significantly increase the effective experience level for any engineering design team. The performance measure of the whole team can be increased by increasing the engineering disciplines' cross awareness of each other and by familiarizing them with their affect at the system level. Discipline engineers know their own discipline well, but typically are not intimately familiar with their technical interaction with and dependencies on all the other disciplines of engineering. These dependencies are design integration functions and are worked out well by the discipline engineers as long as they are involved in the design of types of systems that they have experience with.

  3. Engineers Without Borders Australia--lessons learned from an innovative approach to the upgrade of water supply infrastructure in Tenganan, Indonesia.

    PubMed

    Third, K; Fun, O M; Bowen, J; Micenko, A; Grey, V; Prohasky, T

    2009-01-01

    The community of Tenganan in eastern Bali, Indonesia, has requested technical assistance from Engineers Without Borders Australia (EWB) to improve the quantity and quality of water delivered through their water supply system. This is a unique development project in which the Tenganan people have identified their own needs and developed their own conceptual solution to the problem. For the first time, EWB is undertaking the design phase for the water system by an off-shore design team and project assistance team (PAT) based in Australia. This allows EWB to draw on resources and experience of EWB members and their employing companies in Australia. It also enables young engineers to develop skills and experience in development work without having to leave the country. However, the innovative approach also presented significant challenges to the project members, particularly in establishing appropriate design criteria and the co-ordination of simultaneous activities across Australia. This paper describes the approach taken by EWB and makes a preliminary assessment of the benefits and limitations inherent in this approach. The overall aim of the project is to produce a successful "bottom-up" development action that will deliver a sustainable solution to the Tenganan community.

  4. A systematic approach for introducing innovative product design in courses with engineering and nonengineering students.

    PubMed

    Patterson, P E

    2007-01-01

    In our new global economy, biomedical product development teams need to be even more innovative in an environment constrained by fewer resources with less time from concept to market. Teams are often comprised of individuals spread around the world. To simulate this setting, we revised an existing course to incorporate teams of on-campus and distance students, with each team including both engineers and other specialties. Through interactive lectures and projects, we presented a systematic approach to innovation that should be useful to engineers and non-engineers alike. Students found the course challenging and exciting, displaying an improved ability to work in distributed teams and in developing innovative design solutions.

  5. Using Collaborative Engineering to Inform Collaboration Engineering

    NASA Technical Reports Server (NTRS)

    Cooper, Lynne P.

    2012-01-01

    Collaboration is a critical competency for modern organizations as they struggle to compete in an increasingly complex, global environment. A large body of research on collaboration in the workplace focuses both on teams, investigating how groups use teamwork to perform their task work, and on the use of information systems to support team processes ("collaboration engineering"). This research essay presents collaboration from an engineering perspective ("collaborative engineering"). It uses examples from professional and student engineering teams to illustrate key differences in collaborative versus collaboration engineering and investigates how challenges in the former can inform opportunities for the latter.

  6. Satellite-instrument system engineering best practices and lessons

    NASA Astrophysics Data System (ADS)

    Schueler, Carl F.

    2009-08-01

    This paper focuses on system engineering development issues driving satellite remote sensing instrumentation cost and schedule. A key best practice is early assessment of mission and instrumentation requirements priorities driving performance trades among major instrumentation measurements: Radiometry, spatial field of view and image quality, and spectral performance. Key lessons include attention to technology availability and applicability to prioritized requirements, care in applying heritage, approaching fixed-price and cost-plus contracts with appropriate attention to risk, and assessing design options with attention to customer preference as well as design performance, and development cost and schedule. A key element of success either in contract competition or execution is team experience. Perhaps the most crucial aspect of success, however, is thorough requirements analysis and flowdown to specifications driving design performance with sufficient parameter margin to allow for mistakes or oversights - the province of system engineering from design inception to development, test and delivery.

  7. Effective standards and regulatory tools for respiratory gas monitors and pulse oximeters: the role of the engineer and clinician.

    PubMed

    Weininger, Sandy

    2007-12-01

    Developing safe and effective medical devices involves understanding the hazardous situations that can arise in clinical practice and implementing appropriate risk control measures. The hazardous situations may have their roots in the design or in the use of the device. Risk control measures may be engineering or clinically based. A multidisciplinary team of engineers and clinicians is needed to fully identify and assess the risks and implement and evaluate the effectiveness of the control measures. In this paper, I use three issues, calibration/accuracy, response time, and protective measures/alarms, to highlight the contributions of these groups. This important information is captured in standards and regulatory tools to control risk for respiratory gas monitors and pulse oximeters. This paper begins with a discussion of the framework of safety, explaining how voluntary standards and regulatory tools work. The discussion is followed by an examination of how engineering and clinical knowledge are used to support the assurance of safety.

  8. Insights of health district managers on the implementation of primary health care outreach teams in Johannesburg, South Africa: a descriptive study with focus group discussions.

    PubMed

    Moosa, Shabir; Derese, Anselme; Peersman, Wim

    2017-01-21

    Primary health care (PHC) outreach teams are part of a policy of PHC re-engineering in South Africa. It attempts to move the deployment of community health workers (CHWs) from vertical programmes into an integrated generalised team-based approach to care for defined populations in municipal wards. There has little evaluation of PHC outreach teams. Managers' insights are anecdotal. This is descriptive qualitative study with focus group discussions with health district managers of Johannesburg, the largest city in South Africa. This was conducted in a sequence of three meetings with questions around implementation, human resources, and integrated PHC teamwork. There was a thematic content analysis of validated transcripts using the framework method. There were two major themes: leadership-management challenges and human resource challenges. Whilst there was some positive sentiment, leadership-management challenges loomed large: poor leadership and planning with an under-resourced centralised approach, poor communications both within the service and with community, concerns with its impact on current services and resistance to change, and poor integration, both with other streams of PHC re-engineering and current district programmes. Discussion by managers on human resources was mostly on the plight of CHWs and calls for formalisation of CHWs functioning and training and nurse challenges with inappropriate planning and deployment of the team structure, with brief mention of the extended team. Whilst there is positive sentiment towards intent of the PHC outreach team, programme managers in Johannesburg were critical of management of the programme in their health district. Whilst the objective of PHC reform is people-centred health care, its implementation struggles with a centralising tendency amongst managers in the health service in South Africa. Managers in Johannesburg advocated for decentralisation. The implementation of PHC outreach teams is also limited by difficulties with formalisation and training of CHWs and appropriate task shifting to nurses. Change management is required to create true integrate PHC teamwork. Policy review requires addressing these issues.

  9. A Team Building Model for Software Engineering Courses Term Projects

    ERIC Educational Resources Information Center

    Sahin, Yasar Guneri

    2011-01-01

    This paper proposes a new model for team building, which enables teachers to build coherent teams rapidly and fairly for the term projects of software engineering courses. Moreover, the model can also be used to build teams for any type of project, if the team member candidates are students, or if they are inexperienced on a certain subject. The…

  10. Revascularization heart team recommendations as an adjunct to appropriate use criteria for coronary revascularization in patients with complex coronary artery disease.

    PubMed

    Sanchez, Carlos E; Dota, Anthony; Badhwar, Vinay; Kliner, Dustin; Smith, A J Conrad; Chu, Danny; Toma, Catalin; Wei, Lawrence; Marroquin, Oscar C; Schindler, John; Lee, Joon S; Mulukutla, Suresh R

    2016-10-01

    To evaluate how a comprehensive evidence-based clinical review by a multidisciplinary revascularization heart team on treatment decisions for revascularization in patients with complex coronary artery disease using SYNTAX scores combined with Society of Thoracic Surgeons-derived clinical variables can be additive to the utilization of Appropriate Use Criteria for coronary revascularization. Decision-making regarding the use of revascularization for coronary artery disease has come under major scrutiny due to inappropriate overuse of revascularization. There is little data in routine clinical practice evaluating how a structured, multidisciplinary heart team approach may be used in combination with the Appropriate Use Criteria for revascularization. From May 1, 2012 to January 1, 2015, multidisciplinary revascularization heart team meetings were convened to discuss evidence-based management of 301 patients with complex coronary artery disease. Heart team recommendations were adjudicated with the Appropriate Use Criteria for coronary revascularization for each clinical scenario using the Society for Cardiovascular Angiography and Interventions' Quality Improvement Toolkit (SCAI-QIT) Appropriate Use Criteria App. Concordance of the Heart Team to Appropriate Use Criteria had a 99.3% appropriate primary indication for coronary revascularization. Among patients who underwent percutaneous revascularization, 34.9% had an inappropriate or uncertain indication as recommended by the Heart Team. Patients with uncertain or inappropriate percutaneous coronary interventions had significantly higher SYNTAX score (27.3 ± 6.6; 28.5 ± 5.5; 19.2 ± 6; P < 0.0001) and Society of Thoracic Surgeons-Predicted Risk of Mortality (6.1% ± 4.7%; 8.1% ± 6.3%; 3.7% ± 4.1%; P < 0.0081) compared to appropriate indications, frequently had concomitant forms of advanced comorbidities and frailty in the setting of symptomatic coronary artery disease. A formal, multidisciplinary revascularization heart team can provide proper validation for clinical decisions and should be considered in combination with the Appropriate Use Criteria for coronary revascularization to formulate revascularization strategies for individuals in a patient-centered fashion. © 2015 Wiley Periodicals, Inc. © 2015 Wiley Periodicals, Inc.

  11. Computational Fluid Dynamics (CFD) Analysis for the Reduction of Impeller Discharge Flow Distortion

    NASA Technical Reports Server (NTRS)

    Garcia, R.; McConnaughey, P. K.; Eastland, A.

    1993-01-01

    The use of Computational Fluid Dynamics (CFD) in the design and analysis of high performance rocket engine pumps has increased in recent years. This increase has been aided by the activities of the Marshall Space Flight Center (MSFC) Pump Stage Technology Team (PSTT). The team's goals include assessing the accuracy and efficiency of several methodologies and then applying the appropriate methodology(s) to understand and improve the flow inside a pump. The PSTT's objectives, team membership, and past activities are discussed in Garcia1 and Garcia2. The PSTT is one of three teams that form the NASA/MSFC CFD Consortium for Applications in Propulsion Technology (McConnaughey3). The PSTT first applied CFD in the design of the baseline consortium impeller. This impeller was designed for the Space Transportation Main Engine's (STME) fuel turbopump. The STME fuel pump was designed with three impeller stages because a two-stage design was deemed to pose a high developmental risk. The PSTT used CFD to design an impeller whose performance allowed for a two-stage STME fuel pump design. The availability of this design would have lead to a reduction in parts, weight, and cost had the STME reached production. One sample of the baseline consortium impeller was manufactured and tested in a water rig. The test data showed that the impeller performance was as predicted and that a two-stage design for the STME fuel pump was possible with minimal risk. The test data also verified another CFD predicted characteristic of the design that was not desirable. The classical 'jet-wake' pattern at the impeller discharge was strengthened by two aspects of the design: by the high head coefficient necessary for the required pressure rise and by the relatively few impeller exit blades, 12, necessary to reduce manufacturing cost. This 'jet-wake pattern produces an unsteady loading on the diffuser vanes and has, in past rocket engine programs, lead to diffuser structural failure. In industrial applications, this problem is typically avoided by increasing the space between the impeller and the diffuser to allow the dissipation of this pattern and, hence, the reduction of diffuser vane unsteady loading. This approach leads to small performance losses and, more importantly in rocket engine applications, to significant increases in the pump's size and weight. This latter consideration typically makes this approach unacceptable in high performance rocket engines.

  12. Global engineering teams - a programme promoting teamwork in engineering design and manufacturing

    NASA Astrophysics Data System (ADS)

    Oladiran, M. T.; Uziak, J.; Eisenberg, M.; Scheffer, C.

    2011-05-01

    Engineering graduates are expected to possess various competencies categorised into hard and soft skills. The hard skills are acquired through specific coursework, but the soft skills are often treated perfunctorily. Global Engineering Teams (GET) is a programme that promotes project-oriented tasks in virtual student teams working in collaboration with industry partners. Teamwork is a major success factor for GET as students always work in groups of varying sizes. A questionnaire-based survey of the 2008 cohort of GET students was conducted to assess teamwork, communication and conflict resolution among group members. The results confirmed that deliverables are readily achieved in teams and communication was open. A challenge of using virtual teams is the availability of high-speed Internet access. The GET programme shows that it is possible to deliver engineering design and manufacturing via industry/university collaboration. The programme also facilitates multidisciplinary teamwork at an international level.

  13. Aerospace Concurrent Engineering Design Teams: Current State, Next Steps and a Vision for the Future

    NASA Technical Reports Server (NTRS)

    Hihn, Jairus; Chattopadhyay, Debarati; Karpati, Gabriel; McGuire, Melissa; Borden, Chester; Panek, John; Warfield, Keith

    2011-01-01

    Over the past sixteen years, government aerospace agencies and aerospace industry have developed and evolved operational concurrent design teams to create novel spaceflight mission concepts and designs. These capabilities and teams, however, have evolved largely independently. In today's environment of increasingly complex missions with limited budgets it is becoming readily apparent that both implementing organizations and today's concurrent engineering teams will need to interact more often than they have in the past. This will require significant changes in the current state of practice. This paper documents the findings from a concurrent engineering workshop held in August 2010 to identify the key near term improvement areas for concurrent engineering capabilities and challenges to the long-term advancement of concurrent engineering practice. The paper concludes with a discussion of a proposed vision for the evolution of these teams over the next decade.

  14. One more thing: Faculty response to increased emphasis on project teams in undergraduate engineering education

    NASA Astrophysics Data System (ADS)

    Hunter, Jane

    Tenured and tenure-track faculty members at institutions of higher education, especially those at Research I institutions, are being asked to do more than ever before. With rapidly changing technology, significant decreases in public funding, the shift toward privately funded research, and the ever increasing expectations of students for an education that adequately prepares them for professional careers, engineering faculty are particularly challenged by the escalating demands on their time. In 1996, the primary accreditation organization for engineering programs (ABET) adopted new criteria that required, among other things, engineering programs to teach students to function on multidisciplinary teams and to communicate effectively. In response, most engineering programs utilize project teams as a strategy for teaching these skills. The purpose of this qualitative study of tenured and tenure track engineering faculty at a Research I institution in the southwestern United States was to explore the variety of ways in which the engineering faculty responded to the demands placed upon them as a result of the increased emphasis on project teams in undergraduate engineering education. Social role theory and organizational climate theory guided the study. Some faculty viewed project teams as an opportunity for students to learn important professional skills and to benefit from collaborative learning but many questioned the importance and feasibility of teaching teamwork skills and had concerns about taking time away from other essential fundamental material such as mathematics, basic sciences and engineering sciences. Although the administration of the College of Engineering articulated strong support for the use of project teams in undergraduate education, the prevailing climate did little to promote significant efforts related to effective utilization of project teams. Too often, faculty were unwilling to commit sufficient time or effort to make project teamwork a truly valuable learning opportunity because those efforts were not perceived to be valuable and were rarely rewarded. Few formal professional development opportunities were available and few incentives were in place to encourage other informal efforts to develop the necessary skills. Those who committed significant effort to project teams were challenged by concerns about team composition, student accountability and assigning individual grades for group teamwork.

  15. Ethical considerations for a better collaboration between architects and structural engineers: design of buildings with reinforced concrete frame systems in earthquake zones.

    PubMed

    Hurol, Yonca

    2014-06-01

    Architects design building structures, although structural design is the profession of structural engineers. Thus, it is better for architects and structural engineers to collaborate starting from the initial phases of the architectural design. However, this is not very common because of the contradictory design processes and value systems held within the two professions. This article provides a platform upon which architects and structural engineers can resolve the value conflicts between them by analysing phases of the structural design of reinforced concrete frame systems in architecture, the criteria of the structural design for each phase and determining the conflicting values for each criterion. The results shown in the article demonstrate that the architectural design of structures is a complex process, which is based on contradictory values and value systems. Finally, the article suggests to architects and structural engineers to use Value Sensitive Design and to choose an appropriate team leader in order to resolve the unethical conflict between them and to avoid any unreasonable decision making.

  16. Team-Based Development of Medical Devices: An Engineering-Business Collaborative.

    PubMed

    Eberhardt, Alan W; Johnson, Ophelia L; Kirkland, William B; Dobbs, Joel H; Moradi, Lee G

    2016-07-01

    There is a global shift in the teaching methodology of science and engineering toward multidisciplinary, team-based processes. To meet the demands of an evolving technical industry and lead the way in engineering education, innovative curricula are essential. This paper describes the development of multidisciplinary, team-based learning environments in undergraduate and graduate engineering curricula focused on medical device design. In these programs, students actively collaborate with clinicians, professional engineers, business professionals, and their peers to develop innovative solutions to real-world problems. In the undergraduate senior capstone courses, teams of biomedical engineering (BME) and business students have produced and delivered numerous functional prototypes to satisfied clients. Pursuit of commercialization of devices has led to intellectual property (IP) disclosures and patents. Assessments have indicated high levels of success in attainment of student learning outcomes and student satisfaction with their undergraduate design experience. To advance these projects toward commercialization and further promote innovative team-based learning, a Master of Engineering (MEng) in Design and Commercialization was recently launched. The MEng facilitates teams of graduate students in engineering, life sciences, and business who engage in innovation-commercialization (IC) projects and coursework that take innovative ideas through research and development (R&D) to create marketable devices. The activities are structured with students working together as a "virtual company," with targeted outcomes of commercialization (license agreements and new start-ups), competitive job placement, and/or career advancement.

  17. 33 CFR 385.17 - Project Delivery Team.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Project Delivery Team. 385.17... Processes § 385.17 Project Delivery Team. (a) In accordance with the procedures of the Corps of Engineers...,” the Corps of Engineers and the non-Federal sponsor shall form a Project Delivery Team to develop the...

  18. 33 CFR 385.17 - Project Delivery Team.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Project Delivery Team. 385.17... Processes § 385.17 Project Delivery Team. (a) In accordance with the procedures of the Corps of Engineers...,” the Corps of Engineers and the non-Federal sponsor shall form a Project Delivery Team to develop the...

  19. 33 CFR 385.17 - Project Delivery Team.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Project Delivery Team. 385.17... Processes § 385.17 Project Delivery Team. (a) In accordance with the procedures of the Corps of Engineers...,” the Corps of Engineers and the non-Federal sponsor shall form a Project Delivery Team to develop the...

  20. 33 CFR 385.17 - Project Delivery Team.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Project Delivery Team. 385.17... Processes § 385.17 Project Delivery Team. (a) In accordance with the procedures of the Corps of Engineers...,” the Corps of Engineers and the non-Federal sponsor shall form a Project Delivery Team to develop the...

  1. 33 CFR 385.17 - Project Delivery Team.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Project Delivery Team. 385.17... Processes § 385.17 Project Delivery Team. (a) In accordance with the procedures of the Corps of Engineers...,” the Corps of Engineers and the non-Federal sponsor shall form a Project Delivery Team to develop the...

  2. Team Problem Solving Strategies with a Survey of These Methods Used by Faculty Members in Engineering Technology

    ERIC Educational Resources Information Center

    Marcus, Michael L.; Winters, Dixie L.

    2004-01-01

    Students from science, engineering, and technology programs should be able to work together as members of project teams to find solutions to technical problems. The exercise in this paper describes the methods actually used by a project team from a Biomedical Instrumentation Corporation in which scientists, technicians, and engineers from various…

  3. Design and Implementation of the Boundary Layer Transition Flight Experiment on Space Shuttle Discovery

    NASA Technical Reports Server (NTRS)

    Spanos, Theodoros A.; Micklos, Ann

    2010-01-01

    In an effort to better the understanding of high speed aerodynamics, a series of flight experiments were installed on Space Shuttle Discovery during the STS-119 and STS-128 missions. This experiment, known as the Boundary Layer Transition Flight Experiment (BLTFE), provided the technical community with actual entry flight data from a known height protuberance at Mach numbers at and above Mach 15. Any such data above Mach 15 is irreproducible in a laboratory setting. Years of effort have been invested in obtaining this valuable data, and many obstacles had to be overcome in order to ensure the success of implementing an Orbiter modification. Many Space Shuttle systems were involved in the installation of appropriate components that revealed 'concurrent engineering' was a key integration tool. This allowed the coordination of all various parts and pieces which had to be sequenced appropriately and installed at the right time. Several issues encountered include Orbiter configuration and access, design requirements versus current layout, implementing the modification versus typical processing timelines, and optimizing the engineering design cycles and changes. Open lines of communication within the entire modification team were essential to project success as the team was spread out across the United States, from NASA Kennedy Space Center in Florida, to NASA Johnson Space Center in Texas, to Boeing Huntington Beach, California among others. The forum permits the discussion of processing concerns from the design phase to the implementation phase, which eventually saw the successful flights and data acquisition on STS-119 in March 2009 and on STS-128 in September 2009.

  4. Imagery Integration Team

    NASA Technical Reports Server (NTRS)

    Calhoun, Tracy; Melendrez, Dave

    2014-01-01

    The Human Exploration Science Office (KX) provides leadership for NASA's Imagery Integration (Integration 2) Team, an affiliation of experts in the use of engineering-class imagery intended to monitor the performance of launch vehicles and crewed spacecraft in flight. Typical engineering imagery assessments include studying and characterizing the liftoff and ascent debris environments; launch vehicle and propulsion element performance; in-flight activities; and entry, landing, and recovery operations. Integration 2 support has been provided not only for U.S. Government spaceflight (e.g., Space Shuttle, Ares I-X) but also for commercial launch providers, such as Space Exploration Technologies Corporation (SpaceX) and Orbital Sciences Corporation, servicing the International Space Station. The NASA Integration 2 Team is composed of imagery integration specialists from JSC, the Marshall Space Flight Center (MSFC), and the Kennedy Space Center (KSC), who have access to a vast pool of experience and capabilities related to program integration, deployment and management of imagery assets, imagery data management, and photogrammetric analysis. The Integration 2 team is currently providing integration services to commercial demonstration flights, Exploration Flight Test-1 (EFT-1), and the Space Launch System (SLS)-based Exploration Missions (EM)-1 and EM-2. EM-2 will be the first attempt to fly a piloted mission with the Orion spacecraft. The Integration 2 Team provides the customer (both commercial and Government) with access to a wide array of imagery options - ground-based, airborne, seaborne, or vehicle-based - that are available through the Government and commercial vendors. The team guides the customer in assembling the appropriate complement of imagery acquisition assets at the customer's facilities, minimizing costs associated with market research and the risk of purchasing inadequate assets. The NASA Integration 2 capability simplifies the process of securing one-of-a-kind imagery assets and skill sets, such as ground-based fixed and tracking cameras, crew-in the-loop imaging applications, and the integration of custom or commercial-off-the-shelf sensors onboard spacecraft. For spaceflight applications, the Integration 2 Team leverages modeling, analytical, and scientific resources along with decades of experience and lessons learned to assist the customer in optimizing engineering imagery acquisition and management schemes for any phase of flight - launch, ascent, on-orbit, descent, and landing. The Integration 2 Team guides the customer in using NASA's world-class imagery analysis teams, which specialize in overcoming inherent challenges associated with spaceflight imagery sets. Precision motion tracking, two-dimensional (2D) and three-dimensional (3D) photogrammetry, image stabilization, 3D modeling of imagery data, lighting assessment, and vehicle fiducial marking assessments are available. During a mission or test, the Integration 2 Team provides oversight of imagery operations to verify fulfillment of imagery requirements. The team oversees the collection, screening, and analysis of imagery to build a set of imagery findings. It integrates and corroborates the imagery findings with other mission data sets, generating executive summaries to support time-critical mission decisions.

  5. Understanding the Effects of Team Cognition Associated with Complex Engineering Tasks: Dynamics of Shared Mental Models, Task-SMM, and Team-SMM

    ERIC Educational Resources Information Center

    Lee, Miyoung; Johnson, Tristan E.

    2008-01-01

    This study investigates how shared mental models (SMMs) change over time in teams of students in a manufacturing engineering course. A complex ill-structured project was given to each team. The objective of the team project was to analyze, test, and propose ways to improve their given manufactured product. Shared mental models were measured in…

  6. Essential elements in teaming: Creation of a team rubric

    DOT National Transportation Integrated Search

    2002-12-01

    To further meet the needs of faculty and students at the University of Idaho in the College of Engineering, the Learning Environment Developers (a group of seven undergraduate mechanical engineering students known as Team LED) proposed to develop a r...

  7. Exploring the Relationships among Creativity, Engineering Knowledge, and Design Team Interaction on Senior Engineering Design Projects

    ERIC Educational Resources Information Center

    Ibrahim, Badaruddin

    2012-01-01

    In the 21st century, engineers are expected to be creative and work collaboratively in teams to solve or design new products. Research in the past has shown how creativity and good team communication, together with knowledge, can impact the outcomes in the organization. The purpose of this study was to explore the relationships among creativity,…

  8. 40 CFR 1042.620 - Engines used solely for competition.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... section apply for new Category 1 engines and vessels built on or after January 1, 2009. (a) We may grant... limited to professional racing teams, professional racers, or other qualified racers. For replacement engines, the sale of the engine itself must be limited to professional racing teams, professional racers...

  9. 40 CFR 1042.620 - Engines used solely for competition.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... section apply for new Category 1 engines and vessels built on or after January 1, 2009. (a) We may grant... limited to professional racing teams, professional racers, or other qualified racers. For replacement engines, the sale of the engine itself must be limited to professional racing teams, professional racers...

  10. 40 CFR 1042.620 - Engines used solely for competition.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... section apply for new Category 1 engines and vessels built on or after January 1, 2009. (a) We may grant... limited to professional racing teams, professional racers, or other qualified racers. For replacement engines, the sale of the engine itself must be limited to professional racing teams, professional racers...

  11. 40 CFR 1042.620 - Engines used solely for competition.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... section apply for new Category 1 engines and vessels built on or after January 1, 2009. (a) We may grant... limited to professional racing teams, professional racers, or other qualified racers. For replacement engines, the sale of the engine itself must be limited to professional racing teams, professional racers...

  12. 40 CFR 1042.620 - Engines used solely for competition.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... section apply for new Category 1 engines and vessels built on or after January 1, 2009. (a) We may grant... limited to professional racing teams, professional racers, or other qualified racers. For replacement engines, the sale of the engine itself must be limited to professional racing teams, professional racers...

  13. The Tailoring of Traditional Systems Engineering for the Morpheus Project

    NASA Technical Reports Server (NTRS)

    Devolites, Jennifer L.; Hart, Jeremy J.

    2013-01-01

    NASA's Morpheus Project has developed and tested a prototype planetary lander capable of vertical takeoff and landing that is designed to serve as a testbed for advanced spacecraft technologies. The lander vehicle, propelled by a LOX/Methane engine and sized to carry a 500kg payload to the lunar surface, provides a platform for bringing technologies from the laboratory into an integrated flight system at relatively low cost. From the beginning, one of goals for the Morpheus Project was to streamline agency processes and practices. The Morpheus project accepted a challenge to tailor the traditional NASA systems engineering approach in a way that would be appropriate for a lower cost, rapid prototype engineering effort, but retain the essence of the guiding principles. The team has produced innovative ways to create an infrastructure and approach that would challenge existing systems engineering processes while still enabling successful implementation of the current Morpheus Project. This paper describes the tailored systems engineering approach for the Morpheus project, including the processes, tools, and amount of rigor employed over the project's multiple lifecycles since the project began in FY11. Lessons learned from these trials have the potential to be scaled up and improve efficiency on a larger projects or programs.

  14. Risk Identification and Visualization in a Concurrent Engineering Team Environment

    NASA Technical Reports Server (NTRS)

    Hihn, Jairus; Chattopadhyay, Debarati; Shishko, Robert

    2010-01-01

    Incorporating risk assessment into the dynamic environment of a concurrent engineering team requires rapid response and adaptation. Generating consistent risk lists with inputs from all the relevant subsystems and presenting the results clearly to the stakeholders in a concurrent engineering environment is difficult because of the speed with which decisions are made. In this paper we describe the various approaches and techniques that have been explored for the point designs of JPL's Team X and the Trade Space Studies of the Rapid Mission Architecture Team. The paper will also focus on the issues of the misuse of categorical and ordinal data that keep arising within current engineering risk approaches and also in the applied risk literature.

  15. Team-Based Development of Medical Devices: An Engineering–Business Collaborative

    PubMed Central

    Eberhardt, Alan W.; Johnson, Ophelia L.; Kirkland, William B.; Dobbs, Joel H.; Moradi, Lee G.

    2016-01-01

    There is a global shift in the teaching methodology of science and engineering toward multidisciplinary, team-based processes. To meet the demands of an evolving technical industry and lead the way in engineering education, innovative curricula are essential. This paper describes the development of multidisciplinary, team-based learning environments in undergraduate and graduate engineering curricula focused on medical device design. In these programs, students actively collaborate with clinicians, professional engineers, business professionals, and their peers to develop innovative solutions to real-world problems. In the undergraduate senior capstone courses, teams of biomedical engineering (BME) and business students have produced and delivered numerous functional prototypes to satisfied clients. Pursuit of commercialization of devices has led to intellectual property (IP) disclosures and patents. Assessments have indicated high levels of success in attainment of student learning outcomes and student satisfaction with their undergraduate design experience. To advance these projects toward commercialization and further promote innovative team-based learning, a Master of Engineering (MEng) in Design and Commercialization was recently launched. The MEng facilitates teams of graduate students in engineering, life sciences, and business who engage in innovation-commercialization (IC) projects and coursework that take innovative ideas through research and development (R&D) to create marketable devices. The activities are structured with students working together as a “virtual company,” with targeted outcomes of commercialization (license agreements and new start-ups), competitive job placement, and/or career advancement. PMID:26902869

  16. Modeling to Mars: a NASA Model Based Systems Engineering Pathfinder Effort

    NASA Technical Reports Server (NTRS)

    Phojanamongkolkij, Nipa; Lee, Kristopher A.; Miller, Scott T.; Vorndran, Kenneth A.; Vaden, Karl R.; Ross, Eric P.; Powell, Bobby C.; Moses, Robert W.

    2017-01-01

    The NASA Engineering Safety Center (NESC) Systems Engineering (SE) Technical Discipline Team (TDT) initiated the Model Based Systems Engineering (MBSE) Pathfinder effort in FY16. The goals and objectives of the MBSE Pathfinder include developing and advancing MBSE capability across NASA, applying MBSE to real NASA issues, and capturing issues and opportunities surrounding MBSE. The Pathfinder effort consisted of four teams, with each team addressing a particular focus area. This paper focuses on Pathfinder team 1 with the focus area of architectures and mission campaigns. These efforts covered the timeframe of February 2016 through September 2016. The team was comprised of eight team members from seven NASA Centers (Glenn Research Center, Langley Research Center, Ames Research Center, Goddard Space Flight Center IV&V Facility, Johnson Space Center, Marshall Space Flight Center, and Stennis Space Center). Collectively, the team had varying levels of knowledge, skills and expertise in systems engineering and MBSE. The team applied their existing and newly acquired system modeling knowledge and expertise to develop modeling products for a campaign (Program) of crew and cargo missions (Projects) to establish a human presence on Mars utilizing In-Situ Resource Utilization (ISRU). Pathfinder team 1 developed a subset of modeling products that are required for a Program System Requirement Review (SRR)/System Design Review (SDR) and Project Mission Concept Review (MCR)/SRR as defined in NASA Procedural Requirements. Additionally, Team 1 was able to perform and demonstrate some trades and constraint analyses. At the end of these efforts, over twenty lessons learned and recommended next steps have been identified.

  17. Improving Engineering Student Team Collaborative Discussions by Moving Them Online: An Investigation of Synchronous Chat and Face-to-Face Team Conversations

    ERIC Educational Resources Information Center

    Fowler, Robin Revette

    2014-01-01

    Collaborative learning, particularly in the context of team-based, project-based learning, is common in undergraduate engineering education and is associated with deeper learning and enhanced student motivation and retention. However, grouping students in teams for project-based learning sometimes has negative outcomes, which can include lowered…

  18. Linking First-Year and Senior Engineering Design Teams: Engaging Early Academic Career Students in Engineering Design

    ERIC Educational Resources Information Center

    Fox, Garey A.; Weckler, Paul; Thomas, Dan

    2015-01-01

    In Biosystems Engineering at Oklahoma State University, senior design is a two semester course in which students work on real-world projects provided by clients. First-year (freshmen and trans­fer) students enroll in an introductory engineering course. Historically, these students worked on a team-based analysis project, and the engineering design…

  19. Radioisotope Power Systems Reference Book for Mission Designers and Planners

    NASA Technical Reports Server (NTRS)

    Lee, Young; Bairstow, Brian

    2015-01-01

    The RPS Program's Program Planning and Assessment (PPA) Office commissioned the Mission Analysis team to develop the Radioisotope Power Systems (RPS) Reference Book for Mission Planners and Designers to define a baseline of RPS technology capabilities with specific emphasis on performance parameters and technology readiness. The main objective of this book is to provide RPS technology information that could be utilized by future mission concept studies and concurrent engineering practices. A progress summary from the major branches of RPS technology research provides mission analysis teams with a vital tool for assessing the RPS trade space, and provides concurrent engineering centers with a consistent set of guidelines for RPS performance characteristics. This book will be iterated when substantial new information becomes available to ensure continued relevance, serving as one of the cornerstone products of the RPS PPA Office. This book updates the original 2011 internal document, using data from the relevant publicly released RPS technology references and consultations with RPS technologists. Each performance parameter and RPS product subsection has been reviewed and cleared by at least one subject matter representative. A virtual workshop was held to reach consensus on the scope and contents of the book, and the definitions and assumptions that should be used. The subject matter experts then reviewed and updated the appropriate sections of the book. The RPS Mission Analysis Team then performed further updates and crosschecked the book for consistency. Finally, a second virtual workshop was held to ensure all subject matter experts and stakeholders concurred on the contents.

  20. Developing teamwork skills in capstone design courses.

    PubMed

    Goldberg, Jay

    2010-01-01

    The majority of our biomedical engineering graduates will eventually work in an industry where they will be part of multidisciplinary teams that use the collective skills, expertise, experience, and training of each team member. Diversity within these teams provides different perspectives, opinions, and ways of viewing problems, leading to a larger set of potential solutions. Successful careers require engineers to be able to function on multidisciplinary teams.

  1. Teaching Tip: Managing Software Engineering Student Teams Using Pellerin's 4-D System

    ERIC Educational Resources Information Center

    Doman, Marguerite; Besmer, Andrew; Olsen, Anne

    2015-01-01

    In this article, we discuss the use of Pellerin's Four Dimension Leadership System (4-D) as a way to manage teams in a classroom setting. Over a 5-year period, we used a modified version of the 4-D model to manage teams within a senior level Software Engineering capstone course. We found that this approach for team management in a classroom…

  2. Hurricane Hugo briefing

    NASA Astrophysics Data System (ADS)

    Bush, Susan M.

    The effects of Hurricane Hugo could have been much worse, in terms of lives lost and structural damage, according to postdisaster study teams. As part of the National Research Council's Committee on Natural Disasters, teams were sent to the disaster sites almost immediately after Hugo struck on September 18.Meteorologists, wind engineers, coastal geologists, civil engineers, structural engineers, and other members of the study teams presented their findings at a briefing held November 28 in Washington, D.C.

  3. Experimental Evaluation of the New Automated Team Composition System (ATCS) by Formation of Optimal Teams for an Engineering Research Task

    DTIC Science & Technology

    2010-12-24

    Los Angeles Police Department ) 3. LACSD ( Los Angeles County Sheriff’ Department ) 4. USDHS (US Department of Homeland Security) Candidate Roster... The present study used archival data from a UCLA (University of California Los Angeles ) engineering course in which nominally student teams prepare...psychological literature. The present study used archival data from a UCLA (University of California Los Angeles ) engineering course

  4. The Montana ALE (Autonomous Lunar Excavator) Systems Engineering Report

    NASA Technical Reports Server (NTRS)

    Hull, Bethanne J.

    2012-01-01

    On May 2 1-26, 20 12, the third annual NASA Lunabotics Mining Competition will be held at the Kennedy Space Center in Florida. This event brings together student teams from universities around the world to compete in an engineering challenge. Each team must design, build and operate a robotic excavator that can collect artificial lunar soil and deposit it at a target location. Montana State University, Bozeman, is one of the institutions selected to field a team this year. This paper will summarize the goals of MSU's lunar excavator project, known as the Autonomous Lunar Explorer (ALE), along with the engineering process that the MSU team is using to fulfill these goals, according to NASA's systems engineering guidelines.

  5. Enhancing compliance at Department of Defense facilities: comparison of three environmental audit tools.

    PubMed

    Hepler, Jeff A; Neumann, Cathy

    2003-04-01

    To enhance environmental compliance, the U.S. Department of Defense (DOD) recently developed and implemented a standardized environmental audit tool called The Environmental Assessment and Management (TEAM) Guide. Utilization of a common audit tool (TEAM Guide) throughout DOD agencies could be an effective agent of positive change. If, however, the audit tool is inappropriate, environmental compliance at DOD facilities could worsen. Furthermore, existing audit systems such as the U.S. Environmental Protection Agency's (U.S. EPA's) Generic Protocol for Conducting Environmental Audits of Federal Facilities and the International Organization for Standardization's (ISO's) Standard 14001, "Environmental Management System Audits," may be abandoned even if they offer significant advantages over TEAM Guide audit tool. Widespread use of TEAM Guide should not take place until thorough and independent evaluation has been performed. The purpose of this paper is to compare DOD's TEAM Guide audit tool with U.S. EPA's Generic Protocol for Conducting Environmental Audits of Federal Facilities and ISO 14001, in order to assess which is most appropriate and effective for DOD facilities, and in particular those operated by the U.S. Army Corps of Engineers (USACE). USACE was selected as a result of one author's recent experience as a district environmental compliance coordinator responsible for the audit mission at this agency. Specific recommendations for enhancing the quality of environmental audits at all DOD facilities also are given.

  6. Team science of nursing, engineering, statistics, and practitioner in the development of a robotic reflexology device.

    PubMed

    Wyatt, Gwen; Sikorskii, Alla; Bush, Tamara Reid; Mukherjee, Ranjan

    2010-01-01

    The purpose of this article is to share the lessons learned in forming an interdisciplinary team that implements a team science approach to integrative medicine (IM) research. The disciplines of nursing, statistics, and engineering, along with consultants and a reflexology practitioner, formed this university-based team to conceptualize and develop a prototype robotic device for reflexology for breast cancer patients. The nurse investigator contributed the intervention background and access to the population; the statistician guided the team thinking on factors that needed to be controlled for; the engineers provided the expertise in device design and development; consultants facilitated the team's thinking in new directions; and the reflexology practitioner prescribed the protocol. We discuss the contributions and achievements of each discipline, as well as the challenges, and share the team experiences with the intent to help guide the formation of new IM teams that promote a conducive atmosphere for carrying out cutting-edge IM research and advancing the science.

  7. Using an Undergraduate Materials Research Project to Foster Multidisciplinary Teaming Skills

    ERIC Educational Resources Information Center

    Newell, James A.; Cleary, Doug D.

    2004-01-01

    This paper describes the use of undergraduate materials multidisciplinary research projects as a means of addressing the growing industrial demand for graduates experienced in working in multidisciplinary teams. It includes a detailed description of a project in which a multidisciplinary team of chemical engineering and civil engineering students…

  8. Investigating Team Cohesion in COCOMO II.2000

    ERIC Educational Resources Information Center

    Snowdeal-Carden, Betty A.

    2013-01-01

    Software engineering is team oriented and intensely complex, relying on human collaboration and creativity more than any other engineering discipline. Poor software estimation is a problem that within the United States costs over a billion dollars per year. Effective measurement of team cohesion is foundationally important to gain accurate…

  9. NASA's Robotics Mining Competition Provides Undergraduates Full Life Cycle Systems Engineering Experience

    NASA Technical Reports Server (NTRS)

    Stecklein, Jonette

    2017-01-01

    NASA has held an annual robotic mining competition for teams of university/college students since 2010. This competition is yearlong, suitable for a senior university engineering capstone project. It encompasses the full project life cycle from ideation of a robot design to actual tele-operation of the robot in simulated Mars conditions mining and collecting simulated regolith. A major required element for this competition is a Systems Engineering Paper in which each team describes the systems engineering approaches used on their project. The score for the Systems Engineering Paper contributes 25% towards the team's score for the competition's grand prize. The required use of systems engineering on the project by this competition introduces the students to an intense practical application of systems engineering throughout a full project life cycle.

  10. The Impact of Structured Writing and Developing Awareness of Learning Preferences on the Performance and Attitudes of Engineering Teams

    ERIC Educational Resources Information Center

    Dahm, Kevin; Newell, James; Newell, Heidi; Harvey, Roberta

    2009-01-01

    This paper discusses efforts to develop metacognition in teams of engineering students by: first, exploring personal learning patterns, and second, ongoing biweekly journaling exercises. Thirty-three junior and senior engineering students (30 chemical engineer, one each from mechanical, civil and electrical) working on semester-long projects in…

  11. Team Expo: A State-of-the-Art JSC Advanced Design Team

    NASA Technical Reports Server (NTRS)

    Tripathi, Abhishek

    2001-01-01

    In concert with the NASA-wide Intelligent Synthesis Environment Program, the Exploration Office at the Johnson Space Center has assembled an Advanced Design Team. The purpose of this team is two-fold. The first is to identify, use, and develop software applications, tools, and design processes that streamline and enhance a collaborative engineering environment. The second is to use this collaborative engineering environment to produce conceptual, system-level-of-detail designs in a relatively short turnaround time, using a standing team of systems and integration experts. This includes running rapid trade studies on varying mission architectures, as well as producing vehicle and/or subsystem designs. The standing core team is made up of experts from all of the relevant engineering divisions (e.g. Power, Thermal, Structures, etc.) as well as representatives from Risk and Safety, Mission Operations, and Crew Life Sciences among others. The Team works together during 2- hour sessions in the same specially enhanced room to ensure real-time integration/identification of cross-disciplinary issues and solutions. All subsystem designs are collectively reviewed and approved during these same sessions. In addition there is an Information sub-team that captures and formats all data and makes it accessible for use by the following day. The result is Team Expo: an Advanced Design Team that is leading the change from a philosophy of "over the fence" design to one of collaborative engineering that pushes the envelope to achieve the next-generation analysis and design environment.

  12. Incorporating Solid Modeling and Team-Based Design into Freshman Engineering Graphics.

    ERIC Educational Resources Information Center

    Buchal, Ralph O.

    2001-01-01

    Describes the integration of these topics through a major team-based design and computer aided design (CAD) modeling project in freshman engineering graphics at the University of Western Ontario. Involves n=250 students working in teams of four to design and document an original Lego toy. Includes 12 references. (Author/YDS)

  13. The structural approach to shared knowledge: an application to engineering design teams.

    PubMed

    Avnet, Mark S; Weigel, Annalisa L

    2013-06-01

    We propose a methodology for analyzing shared knowledge in engineering design teams. Whereas prior work has focused on shared knowledge in small teams at a specific point in time, the model presented here is both scalable and dynamic. By quantifying team members' common views of design drivers, we build a network of shared mental models to reveal the structure of shared knowledge at a snapshot in time. Based on a structural comparison of networks at different points in time, a metric of change in shared knowledge is computed. Analysis of survey data from 12 conceptual space mission design sessions reveals a correlation between change in shared knowledge and each of several system attributes, including system development time, system mass, and technological maturity. From these results, we conclude that an early period of learning and consensus building could be beneficial to the design of engineered systems. Although we do not examine team performance directly, we demonstrate that shared knowledge is related to the technical design and thus provide a foundation for improving design products by incorporating the knowledge and thoughts of the engineering design team into the process.

  14. Renovation of a Mechanical Engineering Senior Design Class to an Industry-Tied and Team-Oriented Course

    ERIC Educational Resources Information Center

    Liu, Yucheng

    2017-01-01

    In this work, an industry-based and team-oriented education model was established based on a traditional mechanical engineering (ME) senior design class in order to better prepare future engineers and leaders so as to meet the increasing demand for high-quality engineering graduates. In the renovated curriculum, industry-sponsored projects became…

  15. Exploring Mission Concepts with the JPL Innovation Foundry A-Team

    NASA Technical Reports Server (NTRS)

    Ziemer, John K.; Ervin, Joan; Lang, Jared

    2013-01-01

    The JPL Innovation Foundry has established a new approach for exploring, developing, and evaluating early concepts called the A-Team. The A-Team combines innovative collaborative methods with subject matter expertise and analysis tools to help mature mission concepts. Science, implementation, and programmatic elements are all considered during an A-Team study. Methods are grouped by Concept Maturity Level (CML), from 1 through 3, including idea generation and capture (CML 1), initial feasibility assessment (CML 2), and trade space exploration (CML 3). Methods used for each CML are presented, and the key team roles are described from two points of view: innovative methods and technical expertise. A-Team roles for providing innovative methods include the facilitator, study lead, and assistant study lead. A-Team roles for providing technical expertise include the architect, lead systems engineer, and integration engineer. In addition to these key roles, each A-Team study is uniquely staffed to match the study topic and scope including subject matter experts, scientists, technologists, flight and instrument systems engineers, and program managers as needed. Advanced analysis and collaborative engineering tools (e.g. cost, science traceability, mission design, knowledge capture, study and analysis support infrastructure) are also under development for use in A-Team studies and will be discussed briefly. The A-Team facilities provide a constructive environment for innovative ideas from all aspects of mission formulation to eliminate isolated studies and come together early in the development cycle when they can provide the biggest impact. This paper provides an overview of the A-Team, its study processes, roles, methods, tools and facilities.

  16. The Strength of the Strongest Ties in Collaborative Problem Solving

    NASA Astrophysics Data System (ADS)

    de Montjoye, Yves-Alexandre; Stopczynski, Arkadiusz; Shmueli, Erez; Pentland, Alex; Lehmann, Sune

    2014-06-01

    Complex problem solving in science, engineering, and business has become a highly collaborative endeavor. Teams of scientists or engineers collaborate on projects using their social networks to gather new ideas and feedback. Here we bridge the literature on team performance and information networks by studying teams' problem solving abilities as a function of both their within-team networks and their members' extended networks. We show that, while an assigned team's performance is strongly correlated with its networks of expressive and instrumental ties, only the strongest ties in both networks have an effect on performance. Both networks of strong ties explain more of the variance than other factors, such as measured or self-evaluated technical competencies, or the personalities of the team members. In fact, the inclusion of the network of strong ties renders these factors non-significant in the statistical analysis. Our results have consequences for the organization of teams of scientists, engineers, and other knowledge workers tackling today's most complex problems.

  17. The strength of the strongest ties in collaborative problem solving.

    PubMed

    de Montjoye, Yves-Alexandre; Stopczynski, Arkadiusz; Shmueli, Erez; Pentland, Alex; Lehmann, Sune

    2014-06-20

    Complex problem solving in science, engineering, and business has become a highly collaborative endeavor. Teams of scientists or engineers collaborate on projects using their social networks to gather new ideas and feedback. Here we bridge the literature on team performance and information networks by studying teams' problem solving abilities as a function of both their within-team networks and their members' extended networks. We show that, while an assigned team's performance is strongly correlated with its networks of expressive and instrumental ties, only the strongest ties in both networks have an effect on performance. Both networks of strong ties explain more of the variance than other factors, such as measured or self-evaluated technical competencies, or the personalities of the team members. In fact, the inclusion of the network of strong ties renders these factors non-significant in the statistical analysis. Our results have consequences for the organization of teams of scientists, engineers, and other knowledge workers tackling today's most complex problems.

  18. Constructing engineers through practice: Gendered features of learning and identity development

    NASA Astrophysics Data System (ADS)

    Tonso, Karen L.

    How do women and men student engineers develop an engineering identity (a sense of belonging, or not), while practicing "actual" engineering? What are the influences of gender, learning and knowledge, relations of power, and conceptions of equality on cultural identity development? I studied these issues in reform-minded engineering design classes, courses organized around teaching students communications, teamwork, and practical engineering. Engineering-student cultural identity categories revealed a status hierarchy, predicated on meeting "academic" criteria for excellence, and the almost total exclusion of women. While working as an engineering colleague on five student teams (three first-year and two senior) and attending their design classes, I documented how cultural identities were made evident and constructed in students' practical engineering. Design projects promoted linking academic knowledge with real-world situations, sharing responsibilities and trusting colleagues, communicating engineering knowledge to technical and non-technical members of business communities, and addressing gaps in students' knowledge. With a curriculum analysis and survey of students' perceptions of the differences between design and conventional courses, I embedded the design classes in the wider campus and found that: (1) Engineering education conferred prestige, power, and well-paying jobs on students who performed "academic" engineering, while failing to adequately encourage "actual" engineering practices. High-status student engineers were the least likely to perform "actual" engineering in design teams. (2) Engineering education advanced an ideology that encouraged its practitioners to consider men's privilege and women's invisibility normal. By making "acting like men act" the standards to which engineering students must conform, women learned to put up with oppressive treatment. Women's accepting their own mistreatment and hiding their womanhood became a condition of women's belonging. (3) Despite all of the pressures to do otherwise, (some) teams of students (at all levels) carved out small oases where "actual" engineering prevailed and women's participation was robust. Students--not faculty, not progressive pedagogy, not "reformed" courses--disrupted prevailing norms. However, two women engineering students, one on each senior team, performed fabulous "actual" engineering, yet neither of them had a job when they graduated--the only two senior students on my teams without jobs.

  19. System Engineering Paper

    NASA Technical Reports Server (NTRS)

    Heise, James; Hull, Bethanne J.; Bauer, Jonathan; Beougher, Nathan G.; Boe, Caleb; Canahui, Ricardo; Charles, John P.; Cooper, Zachary Davis Job; DeShaw, Mark A.; Fontanella, Luan Gasparetto; hide

    2012-01-01

    The Iowa State University team, Team LunaCY, is composed of the following sub-teams: the main student organization, the Lunabotics Club; a senior mechanical engineering design course, ME 415; a senior multidisciplinary design course, ENGR 466; and a senior design course from Wartburg College in Waverly, Iowa. Team LunaCY designed and fabricated ART-E III, Astra Robotic Tractor- Excavator the Third, for the team's third appearance in the NASA Lunabotic Mining competition. While designing ART-E III, the team had four main goals for this year's competition:to reduce the total weight of the robot, to increase the amount of regolith simulant mined, to reduce dust, and to make ART-E III autonomous. After many designs and research, a final robot design was chosen that obtained all four goals of Team LunaCY. A few changes Team LunaCY made this year was to go to the electrical, computer, and software engineering club fest at Iowa State University to recruit engineering students to accomplish the task of making ART-E III autonomous. Team LunaCY chose to use LabView to program the robot and various sensors were installed to measure the distance between the robot and the surroundings to allow ART-E III to maneuver autonomously. Team LunaCY also built a testing arena to test prototypes and ART-E III in. To best replicate the competition arena at the Kennedy Space Center, a regolith simulant was made from sand, QuickCrete, and fly ash to cover the floor of the arena. Team LunaCY also installed fans to allow ventilation in the arena and used proper safety attire when working in the arena . With the additional practice in the testing arena and innovative robot design, Team LunaCY expects to make a strong appearance at the 2012 NASA Lunabotic Mining Competition. .

  20. Modular projects and 'mean questions': best practices for advising an International Genetically Engineered Machines team.

    PubMed

    Tsui, Jennifer; Meyer, Anne S

    2016-07-01

    In the yearly Internationally Genetically Engineered Machines (iGEM) competition, teams of Bachelor's and Master's students design and build an engineered biological system using DNA technologies. Advising an iGEM team poses unique challenges due to the inherent difficulties of mounting and completing a new biological project from scratch over the course of a single academic year; the challenges in obtaining financial and structural resources for a project that will likely not be fully realized; and conflicts between educational and competition-based goals. This article shares tips and best practices for iGEM team advisors, from two team advisors with very different experiences with the iGEM competition. © FEMS 2016. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com.

  1. Recent Experiences of the NASA Engineering and Safety Center (NESC) GN and C Technical Discipline Team (TDT)

    NASA Technical Reports Server (NTRS)

    Dennehy, Cornelius J.

    2010-01-01

    The NASA Engineering and Safety Center (NESC), initially formed in 2003, is an independently funded NASA Program whose dedicated team of technical experts provides objective engineering and safety assessments of critical, high risk projects. The GN&C Technical Discipline Team (TDT) is one of fifteen such discipline-focused teams within the NESC organization. The TDT membership is composed of GN&C specialists from across NASA and its partner organizations in other government agencies, industry, national laboratories, and universities. This paper will briefly define the vision, mission, and purpose of the NESC organization. The role of the GN&C TDT will then be described in detail along with an overview of how this team operates and engages in its objective engineering and safety assessments of critical NASA projects. This paper will then describe selected recent experiences, over the period 2007 to present, of the GN&C TDT in which they directly performed or supported a wide variety of NESC assessments and consultations.

  2. Identification and Classification of Common Risks in Space Science Missions

    NASA Technical Reports Server (NTRS)

    Hihn, Jairus M.; Chattopadhyay, Debarati; Hanna, Robert A.; Port, Daniel; Eggleston, Sabrina

    2010-01-01

    Due to the highly constrained schedules and budgets that NASA missions must contend with, the identification and management of cost, schedule and risks in the earliest stages of the lifecycle is critical. At the Jet Propulsion Laboratory (JPL) it is the concurrent engineering teams that first address these items in a systematic manner. Foremost of these concurrent engineering teams is Team X. Started in 1995, Team X has carried out over 1000 studies, dramatically reducing the time and cost involved, and has been the model for other concurrent engineering teams both within NASA and throughout the larger aerospace community. The ability to do integrated risk identification and assessment was first introduced into Team X in 2001. Since that time the mission risks identified in each study have been kept in a database. In this paper we will describe how the Team X risk process is evolving highlighting the strengths and weaknesses of the different approaches. The paper will especially focus on the identification and classification of common risks that have arisen during Team X studies of space based science missions.

  3. Space Transportation Engine Program (STEP), phase B

    NASA Technical Reports Server (NTRS)

    1990-01-01

    The Space Transportation Engine Program (STEP) Phase 2 effort includes preliminary design and activities plan preparation that will allow smooth and time transition into a Prototype Phase and then into Phases 3, 4, and 5. A Concurrent Engineering approach using Total Quality Management (TQM) techniques, is being applied to define an oxygen-hydrogen engine. The baseline from Phase 1/1' studies was used as a point of departure for trade studies and analyses. Existing STME system models are being enhanced as more detailed module/component characteristics are determined. Preliminary designs for the open expander, closed expander, and gas generator cycles were prepared, and recommendations for cycle selection made at the Design Concept Review (DCR). As a result of July '90 DCR, and information subsequently supplied to the Technical Review Team, a gas generator cycle was selected. Results of the various Advanced Development Programs (ADP's) for the Advanced Launch Systems (ALS) were contributive to this effort. An active vehicle integration effort is supplying the NASA, Air Force, and vehicle contractors with engine parameters and data, and flowing down appropriate vehicle requirements. Engine design and analysis trade studies are being documented in a data base that was developed and is being used to organize information. To date, seventy four trade studies were input to the data base.

  4. 40 CFR 1054.620 - What are the provisions for exempting engines used solely for competition?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... equipment built on or after January 1, 2010. (a) We may grant you an exemption from the standards and... competition teams, professional competitors, or other qualified competitors. For replacement engines, the sale of the engine itself must be limited to professional racing teams, professional racers, other...

  5. 40 CFR 1054.620 - What are the provisions for exempting engines used solely for competition?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... equipment built on or after January 1, 2010. (a) We may grant you an exemption from the standards and... competition teams, professional competitors, or other qualified competitors. For replacement engines, the sale of the engine itself must be limited to professional racing teams, professional racers, other...

  6. 40 CFR 1054.620 - What are the provisions for exempting engines used solely for competition?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... equipment built on or after January 1, 2010. (a) We may grant you an exemption from the standards and... competition teams, professional competitors, or other qualified competitors. For replacement engines, the sale of the engine itself must be limited to professional racing teams, professional racers, other...

  7. 40 CFR 1054.620 - What are the provisions for exempting engines used solely for competition?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... equipment built on or after January 1, 2010. (a) We may grant you an exemption from the standards and... competition teams, professional competitors, or other qualified competitors. For replacement engines, the sale of the engine itself must be limited to professional racing teams, professional racers, other...

  8. 40 CFR 1054.620 - What are the provisions for exempting engines used solely for competition?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... equipment built on or after January 1, 2010. (a) We may grant you an exemption from the standards and... competition teams, professional competitors, or other qualified competitors. For replacement engines, the sale of the engine itself must be limited to professional racing teams, professional racers, other...

  9. 15 CFR 270.204 - Provision of additional resources and services needed by a Team.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... services needed by a Team. 270.204 Section 270.204 Commerce and Foreign Trade Regulations Relating to... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Investigations § 270.204 Provision of additional resources and services needed by a Team. The Director will determine the appropriate resources that a Team...

  10. 15 CFR 270.204 - Provision of additional resources and services needed by a Team.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... services needed by a Team. 270.204 Section 270.204 Commerce and Foreign Trade Regulations Relating to... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Investigations § 270.204 Provision of additional resources and services needed by a Team. The Director will determine the appropriate resources that a Team...

  11. 15 CFR 270.204 - Provision of additional resources and services needed by a Team.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... services needed by a Team. 270.204 Section 270.204 Commerce and Foreign Trade Regulations Relating to... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Investigations § 270.204 Provision of additional resources and services needed by a Team. The Director will determine the appropriate resources that a Team...

  12. 15 CFR 270.204 - Provision of additional resources and services needed by a Team.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... services needed by a Team. 270.204 Section 270.204 Commerce and Foreign Trade Regulations Relating to... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Investigations § 270.204 Provision of additional resources and services needed by a Team. The Director will determine the appropriate resources that a Team...

  13. 15 CFR 270.204 - Provision of additional resources and services needed by a Team.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... services needed by a Team. 270.204 Section 270.204 Commerce and Foreign Trade Regulations Relating to... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Investigations § 270.204 Provision of additional resources and services needed by a Team. The Director will determine the appropriate resources that a Team...

  14. Performance of student software development teams: the influence of personality and identifying as team members

    NASA Astrophysics Data System (ADS)

    Monaghan, Conal; Bizumic, Boris; Reynolds, Katherine; Smithson, Michael; Johns-Boast, Lynette; van Rooy, Dirk

    2015-01-01

    One prominent approach in the exploration of the variations in project team performance has been to study two components of the aggregate personalities of the team members: conscientiousness and agreeableness. A second line of research, known as self-categorisation theory, argues that identifying as team members and the team's performance norms should substantially influence the team's performance. This paper explores the influence of both these perspectives in university software engineering project teams. Eighty students worked to complete a piece of software in small project teams during 2007 or 2008. To reduce limitations in statistical analysis, Monte Carlo simulation techniques were employed to extrapolate from the results of the original sample to a larger simulated sample (2043 cases, within 319 teams). The results emphasise the importance of taking into account personality (particularly conscientiousness), and both team identification and the team's norm of performance, in order to cultivate higher levels of performance in student software engineering project teams.

  15. Communication skills to develop trusting relationships on global virtual engineering capstone teams

    NASA Astrophysics Data System (ADS)

    Zaugg, Holt; Davies, Randall S.

    2013-05-01

    As universities seek to provide cost-effective, cross-cultural experiences using global virtual (GV) teams, the 'soft' communication skills typical of all teams, increases in importance for GV teams. Students need to be taught how to navigate through cultural issues and virtual tool issues to build strong trusting relationships with distant team members. Weekly team meetings provide an excellent opportunity to observe key team interactions that facilitate relationship and trust-building among team members. This study observed the weekly team meetings of engineering students attending two US universities and one Asian university as they collaborated as a single GV capstone GV team. In addition local team members were interviewed individually and collectively throughout the project to determine strategies that facilitated team relations and trust. Findings indicate the importance of student choice of virtual communication tools, the refining of communication practices, and specific actions to build trusting relationships. As student developed these attributes, collaboration and success was experienced on this GV team.

  16. Reaching Out: Team AETHER

    NASA Technical Reports Server (NTRS)

    Murphy, Gloria A.

    2010-01-01

    Embry Riddle Aeronautical University's Daytona Beach Campus Lunabotics Team took the opportunity to share the love of space, engineering and technology through the educational outreach portion of the competition. Through visits to elementary schools and high schools, and through support of science fairs and robotics competitions, younger generations were introduced to space, engineering and robotics. This report documents the outreach activities of team Aether.

  17. KSC-2013-3538

    NASA Image and Video Library

    2013-09-11

    CAPE CANAVERAL, Fla. – Engineers from NASA's Kennedy Space Center prep a remote-controlled aircraft for take-off. The aircraft is equipped with a unique set of sensors and software and was assembled by a team of engineers for a competition at the agency's Kennedy Space Center. Teams from Johnson Space Center and Marshall Space Flight Center joined the Kennedy team in competing in an unmanned aerial systems event to evaluate designs and work by engineers learning new specialties. The competition took place at the Shuttle Landing Facility at Kennedy. Photo credit: NASA/Dmitri Gerondidakis

  18. KSC-2013-3544

    NASA Image and Video Library

    2013-09-11

    CAPE CANAVERAL, Fla. – Engineers from NASA's Marshall Space Flight Center prep a remote-controlled aircraft for take-off. The aircraft is equipped with a unique set of sensors and software and was assembled by a team of engineers for a competition at the agency's Kennedy Space Center. Teams from Johnson Space Center and Marshall Space Flight Center joined the Kennedy team in competing in an unmanned aerial systems event to evaluate designs and work by engineers learning new specialties. The competition took place at the Shuttle Landing Facility at Kennedy. Photo credit: NASA/Dmitri Gerondidakis

  19. KSC-2013-3539

    NASA Image and Video Library

    2013-09-11

    CAPE CANAVERAL, Fla. – Engineers from NASA's Kennedy Space Center prep a remote-controlled aircraft for take-off. The aircraft is equipped with a unique set of sensors and software and was assembled by a team of engineers for a competition at the agency's Kennedy Space Center. Teams from Johnson Space Center and Marshall Space Flight Center joined the Kennedy team in competing in an unmanned aerial systems event to evaluate designs and work by engineers learning new specialties. The competition took place at the Shuttle Landing Facility at Kennedy. Photo credit: NASA/Dmitri Gerondidakis

  20. KSC-2013-3545

    NASA Image and Video Library

    2013-09-11

    CAPE CANAVERAL, Fla. – An engineer from NASA's Marshall Space Flight Center prep a remote-controlled aircraft for take-off. The aircraft is equipped with a unique set of sensors and software and was assembled by a team of engineers for a competition at the agency's Kennedy Space Center. Teams from Johnson Space Center and Marshall Space Flight Center joined the Kennedy team in competing in an unmanned aerial systems event to evaluate designs and work by engineers learning new specialties. The competition took place at the Shuttle Landing Facility at Kennedy. Photo credit: NASA/Dmitri Gerondidakis

  1. KSC-2013-3547

    NASA Image and Video Library

    2013-09-11

    CAPE CANAVERAL, Fla. – An engineer from NASA's Marshall Space Flight Center watches the landing of remote-controlled aircraft. The aircraft is equipped with a unique set of sensors and software and was assembled by a team of engineers for a competition at the agency's Kennedy Space Center. Teams from Johnson Space Center and Marshall Space Flight Center joined a Kennedy team in competing in an unmanned aerial systems event to evaluate designs and work by engineers learning new specialties. The competition took place at the Shuttle Landing Facility at Kennedy. Photo credit: NASA/Dmitri Gerondidakis

  2. White House Science Fair

    NASA Image and Video Library

    2014-05-27

    Bobak Ferdowsi, a system's engineer at NASA's Jet Propulsion Laboratory, speaks with a member of "invenTeam" at the White House Science Fair. Olivia Van Amsterdam, 16, Katelyn Sweeney, 17, and their team of student engineers from Natick, MA, invented a 120 lb remotely operated vehicle (ROV) that can help search-and-rescue dive teams search for bodies in dangerous, icy waters. The fourth White House Science Fair was held at the White House and included 100 students from more than 30 different states who competed in science, technology, engineering, and math (STEM) competitions. (Photo Credit: NASA/Aubrey Gemignani)

  3. [Communication within the health care team: doctors and nurses].

    PubMed

    Kollár, János

    2016-04-24

    Proper communication within the health care team is especially important in terms of creating safe emotional and professional conditions for the team members and for quality healing. The aim of the study is to explore the factors that hinder appropriate communication between doctors and nurses and thus to make the effective elimination of the communication disturbances possible. Investigation in main medical databases and general search engines were used for analysing the phenomenon. It was revealed that communication between doctors and nurses is restrained by factors that can be observed on individual, professional and system levels as well. Role confusion, lack of trust, communication barriers arising from hierarchical inequalities, leadership problems, differences in qualifications, burnout and organizational problems can equally be found amongst them. The effectiveness of communication between nurses and doctors in Hungary is especially strongly influenced by the fear of losing jobs, the financial problems arising from different degree of gratuity and the phenomenon of burnout. Changes on individual, professional and system levels are equally important for significant improvement in the communication between doctors and nurses. Joint trainings based on strong organizational development skills and joint conferences could promote significantly better flow of information, mutual appreciation and harmonization.

  4. A web-based online collaboration platform for formulating engineering design projects

    NASA Astrophysics Data System (ADS)

    Varikuti, Sainath

    Effective communication and collaboration among students, faculty and industrial sponsors play a vital role while formulating and solving engineering design projects. With the advent in the web technology, online platforms and systems have been proposed to facilitate interactions and collaboration among different stakeholders in the context of senior design projects. However, there are noticeable gaps in the literature with respect to understanding the effects of online collaboration platforms for formulating engineering design projects. Most of the existing literature is focused on exploring the utility of online platforms on activities after the problem is defined and teams are formed. Also, there is a lack of mechanisms and tools to guide the project formation phase in senior design projects, which makes it challenging for students and faculty to collaboratively develop and refine project ideas and to establish appropriate teams. In this thesis a web-based online collaboration platform is designed and implemented to share, discuss and obtain feedback on project ideas and to facilitate collaboration among students and faculty prior to the start of the semester. The goal of this thesis is to understand the impact of an online collaboration platform for formulating engineering design projects, and how a web-based online collaboration platform affects the amount of interactions among stakeholders during the early phases of design process. A survey measuring the amount of interactions among students and faculty is administered. Initial findings show a marked improvement in the students' ability to share project ideas and form teams with other students and faculty. Students found the online platform simple to use. The suggestions for improving the tool generally included features that were not necessarily design specific, indicating that the underlying concept of this collaborative platform provides a strong basis and can be extended for future online platforms. Although the platform was designed to promote collaboration, adoption of the collaborative platform by students and faculty has been slow. While the platform appears to be very useful for collaboration, more time is required for it to be widely used by all the stakeholders and to fully convert from email communication to the use of the online collaboration platform.

  5. Damage-Tolerant, Affordable Composite Engine Cases Designed and Fabricated

    NASA Technical Reports Server (NTRS)

    Hopkins, Dale A.; Roberts, Gary D.; Pereira, J. Michael; Bowman, Cheryl L.

    2005-01-01

    An integrated team of NASA personnel, Government contractors, industry partners, and university staff have developed an innovative new technology for commercial fan cases that will substantially influence the safety and efficiency of future turbine engines. This effective team, under the direction of the NASA Glenn Research Center and with the support of the Federal Aviation Administration, has matured a new class of carbon/polymer composites and demonstrated a 30- to 50-percent improvement in specific containment capacity (blade fragment kinetic energy/containment system weight). As the heaviest engine component, the engine case/containment system greatly affects both the safety and efficiency of aircraft engines. The ballistic impact research team has developed unique test facilities and methods for screening numerous candidate material systems to replace the traditional heavy, metallic engine cases. This research has culminated in the selection of a polymer matrix composite reinforced with triaxially braided carbon fibers and technology demonstration through the fabrication of prototype engine cases for three major commercial engine manufacturing companies.

  6. Ten principles of good interdisciplinary team work

    PubMed Central

    2013-01-01

    Background Interdisciplinary team work is increasingly prevalent, supported by policies and practices that bring care closer to the patient and challenge traditional professional boundaries. To date, there has been a great deal of emphasis on the processes of team work, and in some cases, outcomes. Method This study draws on two sources of knowledge to identify the attributes of a good interdisciplinary team; a published systematic review of the literature on interdisciplinary team work, and the perceptions of over 253 staff from 11 community rehabilitation and intermediate care teams in the UK. These data sources were merged using qualitative content analysis to arrive at a framework that identifies characteristics and proposes ten competencies that support effective interdisciplinary team work. Results Ten characteristics underpinning effective interdisciplinary team work were identified: positive leadership and management attributes; communication strategies and structures; personal rewards, training and development; appropriate resources and procedures; appropriate skill mix; supportive team climate; individual characteristics that support interdisciplinary team work; clarity of vision; quality and outcomes of care; and respecting and understanding roles. Conclusions We propose competency statements that an effective interdisciplinary team functioning at a high level should demonstrate. PMID:23663329

  7. Ten principles of good interdisciplinary team work.

    PubMed

    Nancarrow, Susan A; Booth, Andrew; Ariss, Steven; Smith, Tony; Enderby, Pam; Roots, Alison

    2013-05-10

    Interdisciplinary team work is increasingly prevalent, supported by policies and practices that bring care closer to the patient and challenge traditional professional boundaries. To date, there has been a great deal of emphasis on the processes of team work, and in some cases, outcomes. This study draws on two sources of knowledge to identify the attributes of a good interdisciplinary team; a published systematic review of the literature on interdisciplinary team work, and the perceptions of over 253 staff from 11 community rehabilitation and intermediate care teams in the UK. These data sources were merged using qualitative content analysis to arrive at a framework that identifies characteristics and proposes ten competencies that support effective interdisciplinary team work. Ten characteristics underpinning effective interdisciplinary team work were identified: positive leadership and management attributes; communication strategies and structures; personal rewards, training and development; appropriate resources and procedures; appropriate skill mix; supportive team climate; individual characteristics that support interdisciplinary team work; clarity of vision; quality and outcomes of care; and respecting and understanding roles. We propose competency statements that an effective interdisciplinary team functioning at a high level should demonstrate.

  8. Missouri S&T formula electric racing.

    DOT National Transportation Integrated Search

    2014-05-01

    The Formula Electric racing team will promote Missouri S&Ts engineering excellence by successfully competing against other top : engineering universities in the US and around the world. Students on the team will have the opportunity to reinforce t...

  9. Clinical Immersion: An Approach for Fostering Cross-disciplinary Communication and Innovation in Nursing and Engineering Students.

    PubMed

    Geist, Melissa J; Sanders, Robby; Harris, Kevin; Arce-Trigatti, Andrea; Hitchcock-Cass, Cary

    2018-05-24

    A faculty team from nursing and chemical engineering developed a course that brought together students from each discipline for cross-disciplinary, team-based clinical immersion and collaboration. Health care processes and devices are rapidly changing, and nurses are uniquely positioned to be bedside innovators to improve patient care delivery. During each clinical immersion, the student teams rotated through various hospital units where they identified problems and worked together in the university's makerspace (iMaker Space) to design and build prototypes to improve health outcomes. Data from the Critical thinking Assessment Test provided evidence of gains in critical-thinking and problem-solving skills, while the problems identified in the clinical setting and prototypes developed demonstrated the impact of bringing nursing and engineering students together to design innovations. When challenged to identify authentic problems during their clinical immersion, the teams of nursing and engineering students proposed creative solutions and developed commercially viable prototypes.

  10. A Curriculum to Enhance Decision-Making Skills of Technical Personnel Working in Teams

    ERIC Educational Resources Information Center

    Raju, P. K.; Sankar, Chetan S.; Xue, Yajiong

    2004-01-01

    Rapidly changing engineering designs and business scenarios make it essential for engineers and technical personnel to be trained to be effective team players and project managers. This paper reports the experiences gained in developing and implementing a workshop to train engineers at a steel manufacturing plant. The objective of the workshop was…

  11. Peer-Led Team Learning in Mathematics Courses for Freshmen Engineering and Computer Science Students

    ERIC Educational Resources Information Center

    Reisel, John R.; Jablonski, Marissa R.; Munson, Ethan; Hosseini, Hossein

    2014-01-01

    Peer-led Team Learning (PLTL) is an instructional method reported to increase student learning in STEM courses. As mathematics is a significant hurdle for many freshmen engineering students, a PLTL program was implemented for students to attempt to improve their course performance. Here, an analysis of PLTL for freshmen engineering students in…

  12. Promoting Collaborative Problem-Solving Skills in a Course on Engineering Grand Challenges

    ERIC Educational Resources Information Center

    Zou, Tracy X. P.; Mickleborough, Neil C.

    2015-01-01

    The ability to solve problems with people of diverse backgrounds is essential for engineering graduates. A course on engineering grand challenges was designed to promote collaborative problem-solving (CPS) skills. One unique component is that students need to work both within their own team and collaborate with the other team to tackle engineering…

  13. Research on Intelligent Synthesis Environment

    NASA Technical Reports Server (NTRS)

    Loftin, R. Bowen; Dryer, David; Major, Debra; Fletcher, Tom

    2002-01-01

    The ultimate goal of this research project is to develop a methodology for the assessment and continuous improvement of engineering team effectiveness in distributed collaborative environments. This review provides the theoretical foundation upon which subsequent empirical work will be based. Our review of the team performance literature has identified the following 12 conceptually distinct team interaction processes as characteristic of effective teams. 1) Mission Analysis; 2) Resource Distribution; 3) Leadership; 4) Timing; 5) Intra-team Feedback; 6) Motivational Functions; 7) Team Orientation; 8) Communication; 9) Coordination; 10) Mutual Performance Monitoring; 11) Back-up Behaviors; and 12) Cooperation. In addition, this review summarizes how team task characteristics (i.e., task type, task complexity, motivation, and temporal changes), team characteristics (i.e., team structure and team knowledge), and individual team member characteristics (i.e., dispositions and teamwork knowledge, skills, and abilities) affect team interaction processes, determine the relevance of these processes, and influence team performance. The costs and benefits of distributed team collaboration are also considered. The review concludes with a brief discussion of the nature of collaborative team engineering tasks.

  14. Research on Intelligent Synthesis Environment

    NASA Astrophysics Data System (ADS)

    Loftin, R. Bowen; Dryer, David; Major, Debra; Fletcher, Tom

    2002-10-01

    The ultimate goal of this research project is to develop a methodology for the assessment and continuous improvement of engineering team effectiveness in distributed collaborative environments. This review provides the theoretical foundation upon which subsequent empirical work will be based. Our review of the team performance literature has identified the following 12 conceptually distinct team interaction processes as characteristic of effective teams. 1) Mission Analysis; 2) Resource Distribution; 3) Leadership; 4) Timing; 5) Intra-team Feedback; 6) Motivational Functions; 7) Team Orientation; 8) Communication; 9) Coordination; 10) Mutual Performance Monitoring; 11) Back-up Behaviors; and 12) Cooperation. In addition, this review summarizes how team task characteristics (i.e., task type, task complexity, motivation, and temporal changes), team characteristics (i.e., team structure and team knowledge), and individual team member characteristics (i.e., dispositions and teamwork knowledge, skills, and abilities) affect team interaction processes, determine the relevance of these processes, and influence team performance. The costs and benefits of distributed team collaboration are also considered. The review concludes with a brief discussion of the nature of collaborative team engineering tasks.

  15. Improving collaborative learning in online software engineering education

    NASA Astrophysics Data System (ADS)

    Neill, Colin J.; DeFranco, Joanna F.; Sangwan, Raghvinder S.

    2017-11-01

    Team projects are commonplace in software engineering education. They address a key educational objective, provide students critical experience relevant to their future careers, allow instructors to set problems of greater scale and complexity than could be tackled individually, and are a vehicle for socially constructed learning. While all student teams experience challenges, those in fully online programmes must also deal with remote working, asynchronous coordination, and computer-mediated communications all of which contribute to greater social distance between team members. We have developed a facilitation framework to aid team collaboration and have demonstrated its efficacy, in prior research, with respect to team performance and outcomes. Those studies indicated, however, that despite experiencing improved project outcomes, students working in effective software engineering teams did not experience significantly improved individual achievement. To address this deficiency we implemented theoretically grounded refinements to the collaboration model based upon peer-tutoring research. Our results indicate a modest, but statistically significant (p = .08), improvement in individual achievement using this refined model.

  16. Team 282 prepares for the FIRST competition

    NASA Technical Reports Server (NTRS)

    2000-01-01

    The Orange Crusher team (282) works on their robot, which is named Rust Bot, during the FIRST competition. The team of students from Lake Howell, Winter Springs and Orange Christian Private high schools was co-sponsored by NASA Kennedy Space Center, Matern Professional Engineering The Foundation, Control Technologies, Lucent Technologies and Sandy Engineering. Students from all over the country are at the KSC Visitor Complex for the FIRST (For Inspiration and Recognition of Science and Technology) Southeast Regional competition March 9-11 in the Rocket Garden. Teams of high school students are testing the limits of their imagination using robots they have designed, with the support of business and engineering professionals and corporate sponsors, to compete in a technological battle against other schools' robots. Of the 30 high school teams competing, 16 are Florida teams co- sponsored by NASA and KSC contractors. Local high schools participating are Astronaut, Bayside, Cocoa Beach, Eau Gallie, Melbourne, Melbourne Central Catholic, Palm Bay, Rockledge, Satellite, and Titusville.

  17. A Global Assessment of Stem Cell Engineering

    PubMed Central

    Loring, Jeanne F.; McDevitt, Todd C.; Palecek, Sean P.; Schaffer, David V.; Zandstra, Peter W.

    2014-01-01

    Over the last 2 years a global assessment of stem cell engineering (SCE) was conducted with the sponsorship of the National Science Foundation, the National Cancer Institute at the National Institutes of Health, and the National Institute of Standards and Technology. The purpose was to gather information on the worldwide status and trends in SCE, that is, the involvement of engineers and engineering approaches in the stem cell field, both in basic research and in the translation of research into clinical applications and commercial products. The study was facilitated and managed by the World Technology Evaluation Center. The process involved site visits in both Asia and Europe, and it also included several different workshops. From this assessment, the panel concluded that there needs to be an increased role for engineers and the engineering approach. This will provide a foundation for the generation of new markets and future economic growth. To do this will require an increased investment in engineering, applied research, and commercialization as it relates to stem cell research and technology. It also will require programs that support interdisciplinary teams, new innovative mechanisms for academic–industry partnerships, and unique translational models. In addition, the global community would benefit from forming strategic partnerships between countries that can leverage existing and emerging strengths in different institutions. To implement such partnerships will require multinational grant programs with appropriate review mechanisms. PMID:24428577

  18. A global assessment of stem cell engineering.

    PubMed

    Loring, Jeanne F; McDevitt, Todd C; Palecek, Sean P; Schaffer, David V; Zandstra, Peter W; Nerem, Robert M

    2014-10-01

    Over the last 2 years a global assessment of stem cell engineering (SCE) was conducted with the sponsorship of the National Science Foundation, the National Cancer Institute at the National Institutes of Health, and the National Institute of Standards and Technology. The purpose was to gather information on the worldwide status and trends in SCE, that is, the involvement of engineers and engineering approaches in the stem cell field, both in basic research and in the translation of research into clinical applications and commercial products. The study was facilitated and managed by the World Technology Evaluation Center. The process involved site visits in both Asia and Europe, and it also included several different workshops. From this assessment, the panel concluded that there needs to be an increased role for engineers and the engineering approach. This will provide a foundation for the generation of new markets and future economic growth. To do this will require an increased investment in engineering, applied research, and commercialization as it relates to stem cell research and technology. It also will require programs that support interdisciplinary teams, new innovative mechanisms for academic-industry partnerships, and unique translational models. In addition, the global community would benefit from forming strategic partnerships between countries that can leverage existing and emerging strengths in different institutions. To implement such partnerships will require multinational grant programs with appropriate review mechanisms.

  19. Tinkering self-efficacy and team interaction on freshman engineering design teams

    NASA Astrophysics Data System (ADS)

    Richardson, Arlisa Labrie

    This study utilizes Bandura's theory of self-efficacy as a framework to examine the development of tinkering skills white working on a freshman engineering design team. The four sources of self-efficacy were analyzed in the context of tinkering within the design team. The research question, 'Does tinkering self-efficacy change for female students during the Freshman Engineering Design class while working on mixed sex teams?', was addressed using quantitative data collection and field observations. Approximately 41 students enrolled in a freshman engineering design class at a public university in the southwest participated by providing self-reports about their tinkering involvement during each design project. In addition, three mixed-sex student teams were observed while working to complete the course design projects. An observation protocol based on Bandura's sources of self efficacy, was used to document tinkering interactions within the three observed teams. The results revealed that Bandura's sources of self-efficacy influenced tinkering involvement. The self-efficacy source, performance accomplishment measured through prior tinkering experience, was the most influential on tinkering involvement. Unlike Bandura's ranking of influence, verbal persuasion was shown to correlate with more tinkering behaviors than the observation of others. The number of females on a team had no impact on tinkering involvement. Tinkering involvement did not change as students progressed from one project to another. However, the competitive nature of the design project appeared to have a negative impact on tinkering involvement and the division of tasks within the team. In addition, a difference was found in the female students' perception of their tinkering involvement and observation of their tinkering involvement. The findings suggest that effective implementation of teamwork including teamwork preparation, more emphasis on the design process and the elimination of competition between teams are necessary to create a more equitable learning environment.

  20. Gender and Modes of Collaboration in an Engineering Classroom: A Profile of Two Women on Student Teams.

    ERIC Educational Resources Information Center

    Ingram, Sandra; Parker, Anne

    2002-01-01

    Profiles two women from student engineering teams who participated in a study on collaboration and the role of gender. Shows that men and women alike displayed both gender-linked and non-gender-linked behavior, and that successful collaboration was influenced less by gender and more by such factors as a strong work ethic, team commitment, and…

  1. Recent Experiences of the NASA Engineering and Safety Center (NESC) Guidance Navigation and Control (GN and C) Technical Discipline Team (TDT)

    NASA Technical Reports Server (NTRS)

    Dennehy, Cornelius J.

    2011-01-01

    The NASA Engineering and Safety Center (NESC) is an independently funded NASA Program whose dedicated team of technical experts provides objective engineering and safety assessments of critical, high risk projects. NESC's strength is rooted in the diverse perspectives and broad knowledge base that add value to its products, affording customers a responsive, alternate path for assessing and preventing technical problems while protecting vital human and national resources. The Guidance Navigation and Control (GN&C) Technical Discipline Team (TDT) is one of fifteen such discipline-focused teams within the NESC organization. The TDT membership is composed of GN&C specialists from across NASA and its partner organizations in other government agencies, industry, national laboratories, and universities. This paper will briefly define the vision, mission, and purpose of the NESC organization. The role of the GN&C TDT will then be described in detail along with an overview of how this team operates and engages in its objective engineering and safety assessments of critical NASA.

  2. KSC-2011-7246

    NASA Image and Video Library

    2011-10-04

    CAPE CANAVERAL, Fla. -- Members of the crawlerway system evaluation team pose for a group portrait in front of the Headquarters Building at NASA's Kennedy Space Center in Florida. The team received the Florida Project of the Year award from the American Society of Civil Engineers (ASCE). The Cape Canaveral branch of the ASCE nominated the team for its project, the Crawlerway Evaluation to Support a Heavy-Lift Program. The crawlerway is a 130-foot-wide, specialty-built roadway between Kennedy's Vehicle Assembly Building (VAB), where rockets and spacecraft are prepared for flight, and Launch Pad 39A and 39B. The team's more than two-year evaluation confirmed the crawlerway system would be able to support the weight of moving the agency's future heavy-lift rockets and potential commercial vehicles from the VAB to the launch pads. The award honors the team's outstanding engineering efforts in research, design, construction and management, recognizing the complexity of multi-agency coordination and cost-effective engineering advances. For more information on the American Society of Civil Engineers, visit: http://www.asce.org. Photo credit: NASA/Kim Shiflett

  3. KSC-99pp0289

    NASA Image and Video Library

    1999-03-06

    At the award ceremony for the 1999 FIRST Southeastern Regional robotic competition held at KSC, the Space Coast FIRST Team walks past the greeting line. In the middle, shaking hands with the team, are KSC's Director of Engineering Development Sterling Walker (left) and Center Director Roy Bridges (right). The Space Coast Team included Rockledge, Cocoa Beach and Merritt Island High Schools. FIRST is a nonprofit organization, For Inspiration and Recognition of Science and Technology, that sponsors the event pitting gladiator robots against each other in an athletic-style competition. The FIRST robotics competition is designed to provide students with a hands-on, inside look at engineering and other professional careers, pairing high school students with engineer mentors and corporations. The regional event comprised 27 teams. Along with the championship award, which went to high school teams from Miami and San German, Puerto Rico, 15 other awards were presented

  4. From Zero to Integration in Eight Months, the Dawn Ground Data System Engineering Challenge

    NASA Technical Reports Server (NTRS)

    Dubon, Lydia P.

    2006-01-01

    The Dawn GDS Team met the SC Sim integration challenge in eight months. The GDS System Engineering approach in response to the SC Simintegration challenge, focused on a set of key practices: decomposition of project request into manageable requirements; integration of multiple ground disciplines and experts into a focused team effort; risk management thru management of expectations; and aggregation of intermediate products into a final product. By maintaining a a system-level focus, the overall systems engineering process unified team GDS Team members with a common goal: the success of the ground system as a whole and not just the success of their individual expert contributions. Incorporation of Agile-type development efforts were aligned with a risk strategy based on team-oriented principles and expectations management, thus achieving a more stable baseline solution without compromising the integrity of the GDS design.

  5. KSC00pp0325

    NASA Image and Video Library

    2000-03-10

    The Orange Crusher team (282) works on their robot, which is named Rust Bot, during the FIRST competition. The team of students from Lake Howell, Winter Springs and Orange Christian Private high schools was co-sponsored by NASA Kennedy Space Center, Matern Professional Engineering The Foundation, Control Technologies, Lucent Technologies and Sandy Engineering. Students from all over the country are at the KSC Visitor Complex for the FIRST (For Inspiration and Recognition of Science and Technology) Southeast Regional competition March 9-11 in the Rocket Garden. Teams of high school students are testing the limits of their imagination using robots they have designed, with the support of business and engineering professionals and corporate sponsors, to compete in a technological battle against other schools' robots. Of the 30 high school teams competing, 16 are Florida teams co-sponsored by NASA and KSC contractors. Local high schools participating are Astronaut, Bayside, Cocoa Beach, Eau Gallie, Melbourne, Melbourne Central Catholic, Palm Bay, Rockledge, Satellite, and Titusvill

  6. KSC-00pp0325

    NASA Image and Video Library

    2000-03-10

    The Orange Crusher team (282) works on their robot, which is named Rust Bot, during the FIRST competition. The team of students from Lake Howell, Winter Springs and Orange Christian Private high schools was co-sponsored by NASA Kennedy Space Center, Matern Professional Engineering The Foundation, Control Technologies, Lucent Technologies and Sandy Engineering. Students from all over the country are at the KSC Visitor Complex for the FIRST (For Inspiration and Recognition of Science and Technology) Southeast Regional competition March 9-11 in the Rocket Garden. Teams of high school students are testing the limits of their imagination using robots they have designed, with the support of business and engineering professionals and corporate sponsors, to compete in a technological battle against other schools' robots. Of the 30 high school teams competing, 16 are Florida teams co-sponsored by NASA and KSC contractors. Local high schools participating are Astronaut, Bayside, Cocoa Beach, Eau Gallie, Melbourne, Melbourne Central Catholic, Palm Bay, Rockledge, Satellite, and Titusvill

  7. Excite Kids about Engineering: Design Squad[TM] and Engineer Your Life[TM] Resources Make It Easy

    ERIC Educational Resources Information Center

    Cheng, Jack

    2008-01-01

    The author discusses "Design Squad", a television program designed to introduce students to the engineering process. Each episode tells the story of how two teams tackled a particular challenge. A graphic announces each stage (e.g., brainstorm, design, build, test, and redesign) as the teams construct their solutions. These graphics make visual…

  8. Integrating advanced practice providers into medical critical care teams.

    PubMed

    McCarthy, Christine; O'Rourke, Nancy C; Madison, J Mark

    2013-03-01

    Because there is increasing demand for critical care providers in the United States, many medical ICUs for adults have begun to integrate nurse practitioners and physician assistants into their medical teams. Studies suggest that such advanced practice providers (APPs), when appropriately trained in acute care, can be highly effective in helping to deliver high-quality medical critical care and can be important elements of teams with multiple providers, including those with medical house staff. One aspect of building an integrated team is a practice model that features appropriate coding and billing of services by all providers. Therefore, it is important to understand an APP's scope of practice, when they are qualified for reimbursement, and how they may appropriately coordinate coding and billing with other team providers. In particular, understanding when and how to appropriately code for critical care services (Current Procedural Terminology [CPT] code 99291, critical care, evaluation and management of the critically ill or critically injured patient, first 30-74 min; CPT code 99292, critical care, each additional 30 min) and procedures is vital for creating a sustainable program. Because APPs will likely play a growing role in medical critical care units in the future, more studies are needed to compare different practice models and to determine the best way to deploy this talent in specific ICU settings.

  9. Biomedical engineering at Sandia National Laboratories

    NASA Astrophysics Data System (ADS)

    Zanner, Mary Ann

    1994-12-01

    The potential exists to reduce or control some aspects of the U.S. health care expenditure without compromising health care delivery by developing carefully selected technologies which impact favorably on the health care system. A focused effort to develop such technologies is underway at Sandia National Laboratories. As a DOE National Laboratory, Sandia possesses a wealth of engineering and scientific expertise that can be readily applied to this critical national need. Appropriate mechanisms currently exist to allow transfer of technology from the laboratory to the private sector. Sandia's Biomedical Engineering Initiative addresses the development of properly evaluated, cost-effective medical technologies through team collaborations with the medical community. Technology development is subjected to certain criteria including wide applicability, earlier diagnoses, increased efficiency, cost-effectiveness and dual-use. Examples of Sandia's medical technologies include a noninvasive blood glucose sensor, computer aided mammographic screening, noninvasive fetal oximetry and blood gas measurement, burn diagnostics and laser debridement, telerobotics and ultrasonic scanning for prosthetic devices. Sandia National Laboratories has the potential to aid in directing medical technology development efforts which emphasize health care needs, earlier diagnosis, cost containment and improvement of the quality of life.

  10. Safety and Mission Assurance for In-House Design Lessons Learned from Ares I Upper Stage

    NASA Technical Reports Server (NTRS)

    Anderson, Joel M.

    2011-01-01

    This viewgraph presentation identifies lessons learned in the course of the Ares I Upper Stage design and in-house development effort. The contents include: 1) Constellation Organization; 2) Upper Stage Organization; 3) Presentation Structure; 4) Lesson-Importance of Systems Engineering/Integration; 5) Lesson-Importance of Early S&MA Involvement; 6) Lesson-Importance of Appropriate Staffing Levels; 7) Lesson-Importance S&MA Team Deployment; 8) Lesson-Understanding of S&MA In-Line Engineering versus Assurance; 9) Lesson-Importance of Close Coordination between Supportability and Reliability/Maintainability; 10) Lesson-Importance of Engineering Data Systems; 11) Lesson-Importance of Early Development of Supporting Databases; 12) Lesson-Importance of Coordination with Safety Assessment/Review Panels; 13) Lesson-Implementation of Software Reliability; 14) Lesson-Implementation of S&MA Technical Authority/Chief S&MA Officer; 15) Lesson-Importance of S&MA Evaluation of Project Risks; 16) Lesson-Implementation of Critical Items List and Government Mandatory Inspections; 17) Lesson-Implementation of Critical Items List Mandatory Inspections; 18) Lesson-Implementation of Test Article Safety Analysis; and 19) Lesson-Importance of Procurement Quality.

  11. Efficacy Evaluation of Current and Future Naval Mine Warfare Neutralization Method

    DTIC Science & Technology

    2016-12-01

    Distribution is unlimited. EFFICACY EVALUATION OF CURRENT AND FUTURE NAVAL MINE WARFARE NEUTRALIZATION METHOD by Team MIW Cohort SE311-152O...EFFICACY EVALUATION OF CURRENT AND FUTURE NAVAL MINE WARFARE NEUTRALIZATION METHOD 5. FUNDING NUMBERS 6. AUTHOR (S) Team MIW, Systems Engineering...NEUTRALIZATION METHOD Team MIW, Systems Engineering Cohort SE311-152O Submitted in partial fulfillment of the requirements for the degrees of

  12. Sharing best practices in teaching biomedical engineering design.

    PubMed

    Allen, R H; Acharya, S; Jancuk, C; Shoukas, A A

    2013-09-01

    In an effort to share best practices in undergraduate engineering design education, we describe the origin, evolution and the current status of the undergraduate biomedical engineering design team program at Johns Hopkins University. Specifically, we describe the program and judge the quality of the pedagogy by relating it to sponsor feedback, project outcomes, external recognition and student satisfaction. The general pedagogic practices, some of which are unique to Hopkins, that have worked best include: (1) having a hierarchical team structure, selecting team leaders the Spring semester prior to the academic year, and empowering them to develop and manage their teams, (2) incorporating a longitudinal component that incudes freshmen as part of the team, (3) having each team choose from among pre-screened clinical problems, (4) developing relationships and fostering medical faculty, industry and government to allow students access to engineers, clinicians and clinical environments as needed, (5) providing didactic sessions on topics related to requirements for the next presentation, (6) employing judges from engineering, medicine, industry and government to evaluate designs and provide constructive criticisms approximately once every 3-4 weeks and (7) requiring students to test the efficacy of their designs. Institutional support and resources are crucial for the design program to flourish. Most importantly, our willingness and flexibility to change the program each year based on feedback from students, sponsors, outcomes and judges provides a mechanism for us to test new approaches and continue or modify those that work well, and eliminate those that did not.

  13. Improving motivation and engagement in core engineering courses with student teams

    NASA Astrophysics Data System (ADS)

    Trenshaw, Kathryn Faye

    Team-based projects are common in capstone engineering design courses and increasingly common in first-year engineering programs. Despite high enrollments and budget cutbacks affecting many programs, second- and third-year students can also benefit from team-based project experiences, which motivate them to succeed in engineering and prepare them for a globally competitive workforce. My dissertation research demonstrates that team design projects can be incorporated into the curricula of engineering departments, and these projects result in positive affective outcomes for students. Using ABET outcomes and Self Determination Theory (SDT) as the background for my studies, I investigated students' confidence, motivation, and sense of community after experiencing team design projects in two different engineering departments at a large public institution. In the first study, I used a sequential mixed methods approach with a primary quantitative phase followed by an explanatory qualitative phase to evaluate a chemical engineering program that integrated team design projects throughout the curriculum. The evaluation methods included a survey based on desired ABET outcomes for students and focus groups to expand on the quantitative results. Students reported increased confidence in their design, teamwork, and communication skills after completing the projects. In my second and third studies, I used qualitative interviews based on SDT to explore student motivation in an electrical and computer engineering course redesigned to support students' intrinsic motivation to learn. SDT states that intrinsic motivation to learn is supported by increasing students' sense of autonomy, competence, and relatedness in regard to their learning. Using both narrative inquiry and phenomenological methodologies, I analyzed data from interviews of students for mentions of autonomy, competence, and relatedness as well as course events that were critical in changing students' motivation. Analysis revealed that individual choice, constructive failures, and a strong sense of community in the classroom were critical to moving students toward intrinsic motivation. Further, community building through team experiences characterized the essence of the student experience in the course. My research highlights a need for better quantitative measures of students' affective outcomes, specifically motivation, in the context of a single course. Based on the results of my studies, SDT should be reevaluated in terms of possible interdependencies between autonomy, competence, and relatedness, and how the social context of large engineering courses may create a deeper need for supporting relatedness.

  14. Interdisciplinary team interactions: a qualitative study of perceptions of team function in simulated anaesthesia crises.

    PubMed

    Weller, Jennifer M; Janssen, Anna L; Merry, Alan F; Robinson, Brian

    2008-04-01

    We placed anaesthesia teams into a stressful environment in order to explore interactions between members of different professional groups and to investigate their perspectives on the impact of these interactions on team performance. Ten anaesthetists, 5 nurses and 5 trained anaesthetic assistants each participated in 2 full-immersion simulations of critical events using a high-fidelity computerised patient simulator. Their perceptions of team interactions were explored through questionnaires and semi-structured interviews. Written questionnaire data and interview transcriptions were entered into N6 qualitative software. Data were analysed by 2 investigators for emerging themes and coded to produce reports on each theme. We found evidence of limited understanding of the roles and capabilities of team members across professional boundaries, different perceptions of appropriate roles and responsibilities for different members of the team, limited sharing of information between team members and limited team input into decision making. There was a perceived impact on task distribution and the optimal utilisation of resources within the team. Effective management of medical emergencies depends on optimal team function. We have identified important factors affecting interactions between different health professionals in the anaesthesia team, and their perceived influences on team function. This provides evidence on which to build appropriate and specific strategies for interdisciplinary team training in operating theatre staff.

  15. WSF Biodiesel Demonstration Project Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Washington State University; University of Idaho; The Glosten Associates, Inc.

    2009-04-30

    In 2004, WSF canceled a biodiesel fuel test because of “product quality issues” that caused the fuel purifiers to clog. The cancelation of this test and the poor results negatively impacted the use of biodiesel in marine application in the Pacific Northwest. In 2006, The U.S. Department of Energy awarded the Puget Sound Clean Air Agency a grant to manage a scientific study investigating appropriate fuel specifications for biodiesel, fuel handling procedures and to conduct a fuel test using biodiesel fuels in WSF operations. The Agency put together a project team comprised of experts in fields of biodiesel research andmore » analysis, biodiesel production, marine engineering and WSF personnel. The team reviewed biodiesel technical papers, reviewed the 2004 fuel test results, designed a fuel test plan and provided technical assistance during the test. The research reviewed the available information on the 2004 fuel test and conducted mock laboratory experiments, but was not able to determine why the fuel filters clogged. The team then conducted a literature review and designed a fuel test plan. The team implemented a controlled introduction of biodiesel fuels to the test vessels while monitoring the environmental conditions on the vessels and checking fuel quality throughout the fuel distribution system. The fuel test was conducted on the same three vessels that participated in the canceled 2004 test using the same ferry routes. Each vessel used biodiesel produced from a different feedstock (i.e. soy, canola and yellow grease). The vessels all ran on ultra low sulfur diesel blended with biodiesel. The percentage of biodiesel was incrementally raised form from 5 to 20 percent. Once the vessels reached the 20 percent level, they continued at this blend ratio for the remainder of the test. Fuel samples were taken from the fuel manufacturer, during fueling operations and at several points onboard each vessel. WSF Engineers monitored the performance of the fuel systems and engines. Each test vessel did experience a microbial growth bloom that produced a build up of material in the fuel purifiers similar to material witnessed in the 2004 fuel test. A biocide was added with each fuel shipment and the problem subsided. In January of 2009, the WSF successfully completed an eleven month biodiesel fuel test using approximately 1,395,000 gallons of biodiesel blended fuels. The project demonstrated that biodiesel can be used successfully in marine vessels and that current ASTM specifications are satisfactory for marine vessels. Microbial growth in biodiesel diesel interface should be monitored. An inspection of the engines showed no signs of being negatively impacted by the test.« less

  16. Multi-Organization Multi-Discipline Effort Developing a Mitigation Concept for Planetary Defense

    NASA Technical Reports Server (NTRS)

    Leung, Ronald Y.; Barbee, Brent W.; Seery, Bernard D.; Bambacus, Myra; Finewood, Lee; Greenaugh, Kevin C.; Lewis, Anthony; Dearborn, David; Miller, Paul L.; Weaver, Robert P.; hide

    2017-01-01

    There have been significant recent efforts in addressing mitigation approaches to neutralize Potentially Hazardous Asteroids (PHA). One such research effort was performed in 2015 by an integrated, inter-disciplinary team of asteroid scientists, energy deposition modeling scientists, payload engineers, orbital dynamist engineers, spacecraft discipline engineers, and systems architecture engineer from NASAs Goddard Space Flight Center (GSFC) and the Department of Energy (DoE) National Nuclear Security Administration (NNSA) laboratories (Los Alamos National Laboratory (LANL), Lawrence Livermore National Laboratories (LLNL) and Sandia National Laboratories). The study team collaborated with GSFCs Integrated Design Centers Mission Design Lab (MDL) which engaged a team of GSFC flight hardware discipline engineers to work with GSFC, LANL, and LLNL NEA-related subject matter experts during a one-week intensive concept formulation study in an integrated concurrent engineering environment. This team has analyzed the first of several distinct study cases for a multi-year NASA research grant. This Case 1 study references the Near-Earth Asteroid (NEA) named Bennu as the notional target due to the availability of a very detailed Design Reference Asteroid (DRA) model for its orbit and physical characteristics (courtesy of the Spectral Interpretation, Resource Identification, Security-Regolith Explorer (OSIRIS-REx) mission team). The research involved the formulation and optimization of spacecraft trajectories to intercept Bennu, overall mission and architecture concepts, and high-fidelity modeling of both kinetic impact (spacecraft collision to change a NEAs momentum and orbit) and nuclear detonation effects on Bennu, for purposes of deflecting Bennu.

  17. Information sharing systems and teamwork between sub-teams: a mathematical modeling perspective

    NASA Astrophysics Data System (ADS)

    Tohidi, Hamid; Namdari, Alireza; Keyser, Thomas K.; Drzymalski, Julie

    2017-12-01

    Teamwork contributes to a considerable improvement in quality and quantity of the ultimate outcome. Collaboration and alliance between team members bring a substantial progress for any business. However, it is imperative to acquire an appropriate team since many factors must be considered in this regard. Team size may represent the effectiveness of a team and it is of paramount importance to determine what the ideal team size exactly should be. In addition, information technology increasingly plays a differentiating role in productivity and adopting appropriate information sharing systems may contribute to improvement in efficiency especially in competitive markets when there are numerous producers that compete with each other. The significance of transmitting information to individuals is inevitable to assure an improvement in team performance. In this paper, a model of teamwork and its organizational structure are presented. Furthermore, a mathematical model is proposed in order to characterize a group of sub-teams according to two criteria: team size and information technology. The effect of information technology on performance of team and sub-teams as well as optimum size of those team and sub-teams from a productivity perspective are studied. Moreover, a quantitative sensitivity analysis is presented in order to analyze the interaction between these two factors through a sharing system.

  18. Special Gender Studies for Engineering?

    ERIC Educational Resources Information Center

    Ihsen, Susanne

    2005-01-01

    Today we are confronted with a new challenge in product development: "Diversity" needs to be implemented in the engineering design and development teams. Such diversity means to "mirror" within the teams the characteristics of different customer groups: the two genders, the different age groups, and the different cultural…

  19. Army Corps of Engineers: Water Resource Authorizations, Appropriations, and Activities

    DTIC Science & Technology

    2017-02-27

    of Engineers: Water Resource Authorizations, Appropriations, and Activities Congressional Research Service Summary The U.S. Army Corps of......Engineers: Water Resource Authorizations, Appropriations, and Activities Congressional Research Service 1 Army Corps of Engineers The U.S. Army Corps of

  20. Digital Model-Based Engineering: Expectations, Prerequisites, and Challenges of Infusion

    NASA Technical Reports Server (NTRS)

    Hale, J. P.; Zimmerman, P.; Kukkala, G.; Guerrero, J.; Kobryn, P.; Puchek, B.; Bisconti, M.; Baldwin, C.; Mulpuri, M.

    2017-01-01

    Digital model-based engineering (DMbE) is the use of digital artifacts, digital environments, and digital tools in the performance of engineering functions. DMbE is intended to allow an organization to progress from documentation-based engineering methods to digital methods that may provide greater flexibility, agility, and efficiency. The term 'DMbE' was developed as part of an effort by the Model-Based Systems Engineering (MBSE) Infusion Task team to identify what government organizations might expect in the course of moving to or infusing MBSE into their organizations. The Task team was established by the Interagency Working Group on Engineering Complex Systems, an informal collaboration among government systems engineering organizations. This Technical Memorandum (TM) discusses the work of the MBSE Infusion Task team to date. The Task team identified prerequisites, expectations, initial challenges, and recommendations for areas of study to pursue, as well as examples of efforts already in progress. The team identified the following five expectations associated with DMbE infusion, discussed further in this TM: (1) Informed decision making through increased transparency, and greater insight. (2) Enhanced communication. (3) Increased understanding for greater flexibility/adaptability in design. (4) Increased confidence that the capability will perform as expected. (5) Increased efficiency. The team identified the following seven challenges an organization might encounter when looking to infuse DMbE: (1) Assessing value added to the organization. Not all DMbE practices will be applicable to every situation in every organization, and not all implementations will have positive results. (2) Overcoming organizational and cultural hurdles. (3) Adopting contractual practices and technical data management. (4) Redefining configuration management. The DMbE environment changes the range of configuration information to be managed to include performance and design models, database objects, as well as more traditional book-form objects and formats. (5) Developing information technology (IT) infrastructure. Approaches to implementing critical, enabling IT infrastructure capabilities must be flexible, reconfigurable, and updatable. (6) Ensuring security of the single source of truth (7) Potential overreliance on quantitative data over qualitative data. Executable/ computational models and simulations generally incorporate and generate quantitative vice qualitative data. The Task team also developed several recommendations for government, academia, and industry, as discussed in this TM. The Task team recommends continuing beyond this initial work to further develop the means of implementing DMbE and to look for opportunities to collaborate and share best practices.

  1. Teaching engineering ethics using BLOCKS game.

    PubMed

    Lau, Shiew Wei; Tan, Terence Peng Lian; Goh, Suk Meng

    2013-09-01

    The aim of this study was to investigate the use of a newly developed design game called BLOCKS to stimulate awareness of ethical responsibilities amongst engineering students. The design game was played by seventeen teams of chemical engineering students, with each team having to arrange pieces of colored paper to produce two letters each. Before the end of the game, additional constraints were introduced to the teams such that they faced similar ambiguity in the technical facts that the engineers involved in the Challenger disaster had faced prior to the space shuttle launch. At this stage, the teams had to decide whether to continue with their original design or to develop alternative solutions. After the teams had made their decisions, a video of the Challenger explosion was shown followed by a post-game discussion. The students' opinion on five Statements on ethics was tracked via a Five-Item Likert survey which was administered three times, before and after the ethical scenario was introduced, and after the video and post-game discussion. The results from this study indicated that the combination of the game and the real-life incident from the video had generally strengthened the students' opinions of the Statements.

  2. Towards a Methodology for Managing Competencies in Virtual Teams - A Systemic Approach

    NASA Astrophysics Data System (ADS)

    Schumacher, Marinita; Stal-Le Cardinal, Julie; Bocquet, Jean-Claude

    Virtual instruments and tools are future trends in Engineering which are a response to the growing complexity of engineering tasks, the facility of communication and strong collaborations on the international market. Outsourcing, off-shoring, and the globalization of organisations’ activities have resulted in the formation of virtual product development teams. Individuals who are working in virtual teams must be equipped with diversified competencies that provide a basis for virtual team building. Thanks to the systemic approach of the functional analysis our paper responds to the need of a methodology of competence management to build virtual teams that are active in virtual design projects in the area of New Product Development (NPD).

  3. The Cooperate Assistive Teamwork Environment for Software Description Languages.

    PubMed

    Groenda, Henning; Seifermann, Stephan; Müller, Karin; Jaworek, Gerhard

    2015-01-01

    Versatile description languages such as the Unified Modeling Language (UML) are commonly used in software engineering across different application domains in theory and practice. They often use graphical notations and leverage visual memory for expressing complex relations. Those notations are hard to access for people with visual impairment and impede their smooth inclusion in an engineering team. Existing approaches provide textual notations but require manual synchronization between the notations. This paper presents requirements for an accessible and language-aware team work environment as well as our plan for the assistive implementation of Cooperate. An industrial software engineering team consisting of people with and without visual impairment will evaluate the implementation.

  4. Ocean Drilling Program: Drilling Services

    Science.gov Websites

    Drilling operations team Material services team Development engineering team ODP/TAMU Science Operator Home Services department consists of three team-oriented project groups, which also work to improve the existing team. A member of this team sails with each cruise to provide expertise for the shipboard scientific

  5. A NOVEL PROCESS FOR BIOLOGICAL NITROGEN REMOVAL FROM DAIRY WASTEWATER IN CONSTRUCTED WETLANDS

    EPA Science Inventory

    SUNY-ESF has a multidisciplinary P3 Team, although it is mainly composed of undergraduate students in forest engineering and graduate students in environmental and resources engineering. The Team has successfully enriched anammox bacteria in two vertical flow baffled biofilter...

  6. An overview of SAE ARP 1587: Aircraft gas turbine engine monitoring system guide

    NASA Technical Reports Server (NTRS)

    Murphy, J. A.

    1981-01-01

    A systematic approach to developing an engine monitoring system (EMS) is outlined. An extensive shopping list of EMS capabilities and benefits are included. A team approach to developing an EMS is emphasized with a description of the responsibilities of each team member.

  7. IDC Integrated Master Plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clifford, David J.; Harris, James M.

    2014-12-01

    This is the IDC Re-Engineering Phase 2 project Integrated Master Plan (IMP). The IMP presents the major accomplishments planned over time to re-engineer the IDC system. The IMP and the associate Integrated Master Schedule (IMS) are used for planning, scheduling, executing, and tracking the project technical work efforts. REVISIONS Version Date Author/Team Revision Description Authorized by V1.0 12/2014 IDC Re- engineering Project Team Initial delivery M. Harris

  8. Are Nursing Students Appropriate Partners for the Interdisciplinary Training of Surgery Residents?

    PubMed

    Stefanidis, Dimitrios; Ingram, Katherine M; Williams, Kristy H; Bencken, Crystal L; Swiderski, Dawn

    2015-01-01

    Interdisciplinary team training in a simulation center recreates clinical team interactions and holds promise in improving teamwork of clinicians by breaking down educational silos. The objective of our study was to assess the appropriateness of interdisciplinary training with general surgery residents and nursing students. Over 2 consecutive academic years (2012-2013 and 2013-2014), general surgery residents participated in interdisciplinary team-training simulation-based sessions with senior nursing students. Scenario objectives included demonstration of appropriate teamwork and communication, and clinical decision making; sessions incorporated interdisciplinary debriefing of the scenarios. Participants were asked to assess their team-training experience and the appropriateness of their team-training partner. Responses were compared. A total of 16 team-training sessions were conducted during the study period. Overall, 12 surgery residents (67%) and 44 nursing students (63%) who had participated in at least 1 session responded to the survey. Although both residents and nursing students indicated that the knowledge and team skills acquired during these sessions were useful to them in clinical practice (73% vs 86%, respectively; p = not significant), residents rated their educational value lower (3.3 vs 4.3 on a 5-point scale, respectively; p < 0.01) and only 18% of the residents felt that these sessions should be continued compared with 90% of nursing students (p < 0.05). Most useful components of the sessions were participation in the scenario (73%) and debriefing (54%) for residents and for the nursing students, debriefing (91%), observation of others (68%), and interaction with resident physicians (66%) ranked highest; 48% of student nurses preferred residents as team-training partners whereas 100% residents preferred practicing nurses and 0% with nursing students owing to their limited clinical experience. Interdisciplinary team training and debriefing of surgery residents with nursing students is feasible and highly valued by nursing students. Nevertheless, our experience indicates that residents do not prefer nursing students as team-training partners owing to their limited clinical experience and would rather train with experienced nurses. Copyright © 2015 Association of Program Directors in Surgery. Published by Elsevier Inc. All rights reserved.

  9. Linking engineering and medicine: fostering collaboration skills in interdisciplinary teams.

    PubMed

    Khoo, Michael C K

    2012-07-01

    Biomedical engineering embodies the spirit of combining disciplines. The engineer's pragmatic approach to--and appetite for--solving problems is matched by a bounty of technical challenges generated in medical domains. From nanoscale diagnostics to the redesign of systems of health-care delivery, engineers have been connecting advances in basic and applied science with applications that have helped to improve medical care and outcomes. Increasingly, however, integrating these areas of knowledge and application is less individualistic and more of a team sport. Success increasingly relies on a direct focus on practicing and developing collaboration skills in interdisciplinary teams. Such an approach does not fit easily into individual-focused, discipline-based programs. Biomedical engineering has done its fair share of silo busting, but new approaches are needed to inspire interdisciplinary teams to form around challenges in particular areas. Health care offers a wide variety of complex challenges across an array of delivery settings that can call for new interdisciplinary approaches. This was recognized by the deans of the University of Southern California's (USC's) Medical and Engineering Schools when they began the planning process, leading to the creation of the Health, Technology, and Engineering (HTE@USC or HTE for short) program. “Health care and technology are changing rapidly, and future physicians and engineers need intellectual tools to stay ahead of this change,” says Carmen A. Puliafito, dean of the Keck School of Medicine. His goal is to train national leaders in the quest for devices and processes to improve health care.

  10. Human-factors engineering control-room design review/audit: Waterford 3 SES Generating Station, Louisiana Power and Light Company

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Savage, J.W.

    1983-03-10

    A human factors engineering design review/audit of the Waterford-3 control room was performed at the site on May 10 through May 13, 1982. The report was prepared on the basis of the HFEB's review of the applicant's Preliminary Human Engineering Discrepancy (PHED) report and the human factors engineering design review performed at the site. This design review was carried out by a team from the Human Factors Engineering Branch, Division of Human Factors Safety. The review team was assisted by consultants from Lawrence Livermore National Laboratory (University of California), Livermore, California.

  11. Next-generation concurrent engineering: developing models to complement point designs

    NASA Technical Reports Server (NTRS)

    Morse, Elizabeth; Leavens, Tracy; Cohanim, Barbak; Harmon, Corey; Mahr, Eric; Lewis, Brian

    2006-01-01

    Concurrent Engineering Design teams have made routine the rapid development of point designs for space missions. The Jet Propulsion Laboratory's Team X is now evolving into a next generation CED; nin addition to a point design, the team develops a model of the local trade space. The process is a balance between the power of model-developing tools and the creativity of human experts, enabling the development of a variety of trade models for any space mission.

  12. The Roles of Implicit Understanding of Engineering Ethics in Student Teams' Discussion.

    PubMed

    Lee, Eun Ah; Grohman, Magdalena; Gans, Nicholas R; Tacca, Marco; Brown, Matthew J

    2017-12-01

    Following previous work that shows engineering students possess different levels of understanding of ethics-implicit and explicit-this study focuses on how students' implicit understanding of engineering ethics influences their team discussion process, in cases where there is significant divergence between their explicit and implicit understanding. We observed student teams during group discussions of the ethical issues involved in their engineering design projects. Through the micro-scale discourse analysis based on cognitive ethnography, we found two possible ways in which implicit understanding influenced the discussion. In one case, implicit understanding played the role of intuitive ethics-an intuitive judgment followed by reasoning. In the other case, implicit understanding played the role of ethical insight, emotionally guiding the direction of the discussion. In either case, however, implicit understanding did not have a strong influence, and the conclusion of the discussion reflected students' explicit understanding. Because students' implicit understanding represented broader social implication of engineering design in both cases, we suggest to take account of students' relevant implicit understanding in engineering education, to help students become more socially responsible engineers.

  13. Discourse in freshman engineering teams: The relationship between verbal persuasions, self-efficacy, and achievement

    NASA Astrophysics Data System (ADS)

    Yasar, Senay

    Collaborative teamwork is a common practice in both science and engineering schools and workplaces. This study, using a mixed-methods approach, was designed to identify which team discourse characteristics are correlated with changes in student self-efficacy and achievement. Bandura's self-efficacy theory constitutes the theoretical framework. Seven teams, consisting of first-year engineering students, took the pre- and post-surveys and were video- and audio-recorded during a semester-long Introduction to Engineering Design course. Three instruments were developed: a self-efficacy survey, a team interaction observation protocol, and a team interaction self-report survey. The reliability and validity of these instruments were established. An iterative process of code development and refinement led to the development of thirty-five discourse types, which were grouped under six discourse categories: task-oriented, response-oriented, learning-oriented, support-oriented, challenge-oriented, and disruptive. The results of the quantitative data analysis showed that achievement and gain in self-efficacy were significantly correlated ( r=.55, p<.01). There was also a positive correlation between support-orientated discourse and post self-efficacy scores ( r=.43, p<.05). Negative correlations were observed between disruptive discourse behaviors and post self-efficacy (r=-.48, p<.05). Neither being challenged by peers nor receiving negative feedback revealed significant correlations with student self-efficacy. In addition, no direct correlations between the team discourse characteristics and achievement were found. These findings suggest that collaborative teamwork can lead to achievement to the extent that it supports self-efficacy. They also suggest that interactions such as receiving positive or negative feedback have less impact on self-efficacy than does the overall constructive behavior of the group. The qualitative component of the study, which focused on three case studies, presents how supportive and disruptive interactions occurred during team discourse. Discussion includes recommendations for educators on how to help teams build supportive environments as well as what to look for when forming teams and evaluating student team interactions.

  14. KSC-2011-7245

    NASA Image and Video Library

    2011-10-04

    CAPE CANAVERAL, Fla. -- NASA managers at NASA's Kennedy Space Center in Florida show off the Florida Project of the Year trophies that the crawlerway system evaluation team received from the American Society of Civil Engineers (ASCE). From left are Michael Benik, director of Center Operations; Pepper Phillips, manager of the 21st Century Ground Systems Program Office; and Russell Romanella, associate director for Engineering and Technical Operations. The Cape Canaveral branch of the ASCE nominated the team for its project, the Crawlerway Evaluation to Support a Heavy-Lift Program. The crawlerway is a 130-foot-wide, specialty-built roadway between Kennedy's Vehicle Assembly Building (VAB), where rockets and spacecraft are prepared for flight, and Launch Pad 39A and 39B. The team's more than two-year evaluation confirmed the crawlerway system would be able to support the weight of moving the agency's future heavy-lift rockets and potential commercial vehicles from the VAB to the launch pads. The award honors the team's outstanding engineering efforts in research, design, construction and management, recognizing the complexity of multi-agency coordination and cost-effective engineering advances. For more information on the American Society of Civil Engineers, visit: http://www.asce.org. Photo credit: NASA/Kim Shiflett

  15. Turkey BILSAT-1: a Case Study for the Surrey Know-How Transfer and Training Program

    NASA Astrophysics Data System (ADS)

    Ghafoor, Nadeem; Murat Leloglu, Ugur; Sweeting, Martin, , Sir

    2002-01-01

    Surrey has established itself over the past 18 years as a world leader in providing hands-on spacecraft engineering training through its Small Satellite Engineering Know-How Transfer and Training (`KHTT') programme. This 18- month course runs alongside the construction of a microsatellite executed through SSTL, and strikes a balance between classroom-based teaching and total immersion within professional engineering teams. Hands-on training is provided covering the entire satellite engineering process, from mission and subsystem design, through module manufacture, assembly and integration, to qualification and flight model environmental tests, launch and commissioning. SSTL's experience in providing the KHTT programme has resulted in a well-defined course structure that yet retains the ability to accommodate individual customer requirements. The programme also takes full advantage of SSTL's intrinsic link with the Surrey Space Centre (`SSC') at the University of Surrey, offering a range of MSc and PhD research programmes pursuing common research interests of both SSTL and the customer, and in many cases complementing the development of either the customer's satellite or their future plans for an evolved space capability. Throughout 2002, three KHTT programmes have run in parallel at SSTL. A team of 11 engineers from the Centre Nationale des Techniques Spatiales in Algeria have now reached completion of their programme with Alsat-1, the first enhanced microsatellite of the Disaster Monitoring Constellation (`DMC'). In December 2001, 15 engineers from the Federal Ministry of Science and Technology in Nigeria arrived at SSTL and are now midway through their programme with Nigeriasat-1, the second enhanced microsatellite of the DMC. Thirdly, arriving slightly earlier in August 2001, a team from Tubitak-Bilten in Turkey commenced their KHTT programme with BILSAT-1, a high-capability enhanced microsatellite also contributing to the DMC, and are due to continue through February 2003. This paper explores the case of BILSAT-1 as a particular example of the SSTL KHTT approach. The BILSAT-1 KHTT team comprises a core group of 8 young engineers with strong backgrounds in mechanical, electrical and electronic engineering. Complementing the activities of this SSTL-based team are 4 MSc students conducting research at the Surrey Space Centre and a number of academic staff and technicians at Tubitak-Bilten in Ankara. The core team engineers, upon completing their academic lecture programme, immediately became involved in the development work on BILSAT-1. Hardware experience has been gained through the building, integrating and testing of an engineering model, before the team proceeds with testing of the assembled BILSAT-1 flight model. The team has also worked with their colleagues at Tubitak-Bilten in proposing and designing two of the BILSAT-1 payloads, the multispectral imager and the high-performance DSP card, both being manufactured in Turkey. In support of the new facility being built at Tubitak-Bilten several future cleanroom and ECAD staff visited SSTL earlier this year to attend soldering and PCB manufacturing courses. With training in project management forming the final component of the KHTT team's training a firm basis is established from which Tubitak-Bilten hopes to further develop its own satellite production capabilities.

  16. The Five-Factor Model Personality Assessment for Improved Student Design Team Performance

    ERIC Educational Resources Information Center

    Ogot, Madara; Okudan, Gul E.

    2006-01-01

    Researchers have long noted the correlation of various personality traits and team performance. Studies relating aggregate team personality traits to team performance are scattered in the literature and may not always be relevant to engineering design teams. This paper synthesizes the results from applicable Five-Factor Model (FFM)-based…

  17. Measuring Learners' Attitudes toward Team Projects: Scale Development Through Exploratory And Confirmatory Factor Analyses

    ERIC Educational Resources Information Center

    Chyung, Seung Youn; Winiecki, Donald J.; Hunt, Gary; Sevier, Carol M.

    2017-01-01

    Team projects are increasingly used in engineering courses. Students may develop attitudes toward team projects from prior experience, and their attitudinal responses could influence their performance during team project-based learning in the future. Thus, instructors need to measure students' attitudes toward team projects during their learner…

  18. 32 CFR 60.6 - Procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... COMMAND ASSISTANCE TEAM (FACAT) § 60.6 Procedures. (a) Reporting requirements. Any person with a... the number of potential victims and determine whether an installation response team may be appropriate...) Notify the installation commander of the allegation and recommend whether an installation response team...

  19. Leader evaluation and team cohesiveness in the process of team development: A matter of gender?

    PubMed Central

    Sczesny, Sabine; Gumí, Tània; Guimerà, Roger; Sales-Pardo, Marta

    2017-01-01

    Leadership positions are still stereotyped as masculine, especially in male-dominated fields (e.g., engineering). So how do gender stereotypes affect the evaluation of leaders and team cohesiveness in the process of team development? In our study participants worked in 45 small teams (4–5 members). Each team was headed by either a female or male leader, so that 45 leaders (33% women) supervised 258 team members (39% women). Over a period of nine months, the teams developed specific engineering projects as part of their professional undergraduate training. We examined leaders’ self-evaluation, their evaluation by team members, and team cohesiveness at two points of time (month three and month nine, the final month of the collaboration). While we did not find any gender differences in leaders’ self-evaluation at the beginning, female leaders evaluated themselves more favorably than men at the end of the projects. Moreover, female leaders were evaluated more favorably than male leaders at the beginning of the project, but the evaluation by team members did not differ at the end of the projects. Finally, we found a tendency for female leaders to build more cohesive teams than male leaders. PMID:29059231

  20. M.U.S.T. 2007 Summer Research Project at NASA's KSC MILA Facility

    NASA Technical Reports Server (NTRS)

    PintoRey, Christian R.

    2007-01-01

    The summer research activity at Kennedy Space Center (KSC) aims to introduce the student to the basic principles in their field of study. While at KSC, a specific research project awaits the student to complete. As an Aeronautical Engineering student, my assigned project is to assist the cognizant engineer, Mr. Troy Hamilton, in the six engineering phases for replacing the Ponce De Leon (PDL)4.3M Antenna Control Unit (ACU). Although the project mainly requires the attention of two engineers and two students, it also involves the participation of many colleagues at various points during the course of the engineering change (EC). Since the PDL 4.3M ACU engineering change makes both hardware and software changes, it calls upon the expertise of a Hardware Engineer as well as a Software Engineer. As students, Mr. Jeremy Bresette and I have worked side by side with the engineers, gaining invaluable experience. We work in two teams, the hardware team and the software team, On certain tasks, we assist the engineers, while on others we assume their roles. By diligently working in this fashion, we are learning how to communicate effectively as professionals, despite the fact that we are studying different engineering fields. This project has been a great fit for my field of study, as it has highly improved my awareness of the many critical tasks involved in carrying out an engineering project.

  1. KSC-03pd0272

    NASA Image and Video Library

    2003-02-05

    KENNEDY SPACE CENTER, FLA. - Don Maxwell, Safety, United Space Alliance, checks a map of Texas during a meeting of the Recovery Management Team at KSC. The team is part of the investigation into the accident that claimed orbiter Columbia and her crew of seven on Feb. 1, 2003, over East Texas as they returned to Earth after a 16-day research mission. Other team members are Russ DeLoach, chief, Shuttle Mission Assurance Branch, NASA; George Jacobs, Shuttle Engineering; Jeff Campbell, Shuttle Engineering; Dave Rainer, Launch and Landing Operations; the two co-chairs of the Response Management Team, Denny Gagen, Landing Recovery Manager, Chris Hasselbring, Landing Operations, USA; and Larry Ulmer, Safety, NASA. The team is coordinating KSC technical support and assets to the Mishap Investigation Team in Barksdale, La., and providing support for the Recovery teams in Los Angeles, Texas, New Mexico, Arizona and California. In addition, the team is following up on local leads pertaining to potential debris in the KSC area. .

  2. Team LunaCY Outreach Paper

    NASA Technical Reports Server (NTRS)

    Heise, James; Hull, Bethanne J.

    2012-01-01

    Iowa State University's Lunabotics Club, Team LunaCY, has worked hard to generate enthusiasm for robotics, engineering, and lunar activities. Team LunaCY participated in a variety of different outreach events making a strong impression on Iowa youth. These events led the chair of the mechanical engineering department, Dr. Ted Heindel, to refer to the club's outreach program as "the model that all other engineering clubs should follow." Team LunaCY's outreach activities totaled over 200 hours and captivated over 3000 students and adults throughout the course of this acaden1ic year, reaching out to people all over Iowa and to several special guests. These guests included Vice-President Joe Biden, during a visit to Iowa State University in March 2012, and astronaut Clayton Anderson, during a visit to Iowa State's campus in the fall 2011. Team LunaCY's outreach events created hands on learning opportunities for local youth ranging in age from elementary school children to high school students. The team strove to make a positive impression on Iowa youth and to encourage interest and involvement in scientific fields. The full list of events is shown in Table 1. Three of the major outreach events the team participated in were the FIRST LEGO League, Science Bound, and iExplore STEM Festival.

  3. Industry Partners at CBE

    Science.gov Websites

    * Charles M. Salter Associates DIALOG HGA Architects and Engineers HOK Integral Group Interface Engineering + Will SERA Architects Taylor Engineering Team: Atelier Ten Taylor Engineering TRC Energy Services

  4. Air Force Civil Engineer, Volume 16, Number 2, 2008

    DTIC Science & Technology

    2008-01-01

    HORSE and Prime BEEF work together to put up a legal complex for JTF Guantanamo 11 Building Information Modeling in the Air Force Going beyond CADD 14...construction team. Engineers from the 823rd RED HORSE Squadron, Hurlburt Field, Fla., were responsible for most of the design work. The 474th...BEEF construction team and a RED HORSE design team, we quickly became known as the “Red Bulls.” The advance party — consisting of the first sergeant

  5. Athena: Providing Insight into the History of the Universe

    NASA Technical Reports Server (NTRS)

    Murphy, Gloria A.

    2010-01-01

    The American Institute for Aeronautics and Astronautics has provided a Request for Proposal which calls for a manned mission to a Near-Earth Object. It is the goal of Team COLBERT to respond to their request by providing a reusable system that can be implemented as a solid stepping stone for future manned trips to Mars and beyond. Despite Team COLBERT consisting of only students in Aerospace Engineering, in order to achieve this feat, the team must employ the use of Systems Engineering. Tools and processes from Systems Engineering will provide quantitative and semi-quantitative tools for making design decisions and evaluating items such as budgets and schedules. This paper will provide an in-depth look at some of the Systems Engineering processes employed and will step through the design process of a Human Asteroid Exploration System.

  6. Developing an appropriate digital hearing aid for low-resource countries: a case study.

    PubMed

    Israsena, P; Isaradisaikul, S; Noymai, A; Boonyanukul, S; Hemakom, A; Chinnarat, C; Navacharoen, N; Lekagul, S

    2013-01-01

    This paper reviews the development process and discusses the key findings which resulted from our multidisciplinary research team's effort to develop an alternative digital hearing suitable for low-resource countries such as Thailand. A cost-effective, fully programmable digital hearing aid, with its specifications benchmarking against WHO's recommendations, was systematically designed, engineered, and tested. Clinically it had undergone a full clinical trial that employed the outcome measurement protocol adopted from the APHAB, the first time implemented in Thai language. Results indicated that using the hearing aid improves user's satisfaction in terms of ease of communication, background noises, and reverberation, with clear benefit after 3 and 6 months, confirming its efficacy. In terms of engineering, the hearing aid also proved to be robust, passing all the designated tests. As the technology has successfully been transferred to a local company for the production phase, we also discuss other challenges that may arise before the device can be introduced into the market.

  7. Accelerating North American rangeland conservation with earth observation data and user driven web applications.

    NASA Astrophysics Data System (ADS)

    Allred, B. W.; Naugle, D.; Donnelly, P.; Tack, J.; Jones, M. O.

    2016-12-01

    In 2010, the USDA Natural Resources Conservation Service (NRCS) launched the Sage Grouse Initiative (SGI) to voluntarily reduce threats facing sage-grouse and rangelands on private lands. Over the past five years, SGI has matured into a primary catalyst for rangeland and wildlife conservation across the North American west, focusing on the shared vision of wildlife conservation through sustainable working landscapes and providing win-win solutions for producers, sage grouse, and 350 other sagebrush obligate species. SGI and its partners have invested a total of $750 million into rangeland and wildlife conservation. Moving forward, SGI continues to focus on rangeland conservation. Partnering with Google Earth Engine, SGI has developed outcome monitoring and conservation planning tools at continental scales. The SGI science team is currently developing assessment and monitoring algorithms of key conservation indicators. The SGI web application utilizes Google Earth Engine for user defined analysis and planning, putting the appropriate information directly into the hands of managers and conservationists.

  8. 42 CFR 456.605 - Number and location of teams.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 4 2013-10-01 2013-10-01 false Number and location of teams. 456.605 Section 456... Facilities and Institutions for Mental Diseases § 456.605 Number and location of teams. There must be a sufficient number of teams so located within the State that onsite inspections can be made at appropriate...

  9. 42 CFR 456.605 - Number and location of teams.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 4 2012-10-01 2012-10-01 false Number and location of teams. 456.605 Section 456... Facilities and Institutions for Mental Diseases § 456.605 Number and location of teams. There must be a sufficient number of teams so located within the State that onsite inspections can be made at appropriate...

  10. 42 CFR 456.605 - Number and location of teams.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 4 2014-10-01 2014-10-01 false Number and location of teams. 456.605 Section 456... Facilities and Institutions for Mental Diseases § 456.605 Number and location of teams. There must be a sufficient number of teams so located within the State that onsite inspections can be made at appropriate...

  11. 42 CFR 456.605 - Number and location of teams.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 4 2011-10-01 2011-10-01 false Number and location of teams. 456.605 Section 456... Facilities and Institutions for Mental Diseases § 456.605 Number and location of teams. There must be a sufficient number of teams so located within the State that onsite inspections can be made at appropriate...

  12. 42 CFR 456.605 - Number and location of teams.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Number and location of teams. 456.605 Section 456... Facilities and Institutions for Mental Diseases § 456.605 Number and location of teams. There must be a sufficient number of teams so located within the State that onsite inspections can be made at appropriate...

  13. The Impact of an Antimicrobial Utilization Program on Antimicrobial Use at a Large Teaching Hospital: A Randomized Controlled Trial

    PubMed Central

    Camins, Bernard C.; King, Mark D.; Wells, Jane B.; Googe, Heidi L.; Patel, Manish; Kourbatova, Ekaterina V.; Blumberg, Henry M.

    2009-01-01

    Background Multidisciplinary antimicrobial utilization teams (AUT) have been proposed as a mechanism for improving antimicrobial use, but data on their efficacy remain limited. Objective To determine the impact of an AUT on antimicrobial use at a teaching hospital. Design Randomized controlled intervention trial. Setting A 953-bed public university-affiliated urban teaching hospital. Patients Patients who were prescribed selected antimicrobial agents (piperacillin-tazobactam, levofloxacin, or vancomycin) by internal medicine ward teams. Intervention Twelve internal medicine teams were randomized monthly: 6 teams to intervention group (academic detailing by the AUT), and 6 teams to a control group given indication-based guidelines for prescription of broad spectrum antimicrobials (standard of care) during a 10-month study period. Measurements Proportion of appropriate empiric, definitive (therapeutic), and end antimicrobial (overall) usage. Results A total of 784 new prescriptions of piperacillin-tazobactam, levofloxacin, and vancomycin were reviewed. The proportion of appropriate antimicrobial prescriptions written by the intervention teams was significantly higher than prescribed by the control teams: 82% vs. 73% for empiric (RR=1.14, 95% CI 1.04–1.24), 82% vs. 43% for definitive (RR=1.89, 95% CI 1.53–2.33), and 94% vs. 70% for end antimicrobial usage (RR=1.34, 95% CI 1.25–1.43). In a multivariate analysis, teams that received feedback from the AUT alone (aRR=1.37, 95% CI 1.27–1.48) or from both the AUT and the ID consult service (aRR=2.28, 95% CI 1.64–3.19) were significantly more likely to prescribe end antimicrobial usage appropriately compared to control teams. Conclusions A multidisciplinary AUT which provides feedback to prescribing physicians was an effective method in improving antimicrobial use. PMID:19712032

  14. Using Wikis to Investigate Communication, Collaboration and Engagement in Capstone Engineering Design Projects

    ERIC Educational Resources Information Center

    Berthoud, L.; Gliddon, J.

    2018-01-01

    In today's global Aerospace industry, virtual workspaces are commonly used for collaboration between geographically distributed multidisciplinary teams. This study investigated the use of wikis to look at communication, collaboration and engagement in 'Capstone' team design projects at the end of an engineering degree. Wikis were set up for teams…

  15. Implementation of Process Oriented Guided Inquiry Learning (POGIL) in Engineering

    ERIC Educational Resources Information Center

    Douglas, Elliot P.; Chiu, Chu-Chuan

    2013-01-01

    This paper describes implementation and testing of an active learning, team-based pedagogical approach to instruction in engineering. This pedagogy has been termed Process Oriented Guided Inquiry Learning (POGIL), and is based upon the learning cycle model. Rather than sitting in traditional lectures, students work in teams to complete worksheets…

  16. Effective Engineering Presentations through Teaching Visual Literacy Skills.

    ERIC Educational Resources Information Center

    Kerns, H. Dan; And Others

    This paper describes a faculty resource team in the Bradley University (Illinois) Department of Industrial Engineering that works with student project teams in an effort to improve their visualization and oral presentation skills. Students use state of the art technology to develop and display their visuals. In addition to technology, students are…

  17. NASA Planetary Science Summer School: Preparing the Next Generation of Planetary Mission Leaders

    NASA Astrophysics Data System (ADS)

    Budney, C. J.; Lowes, L. L.; Sohus, A.; Wheeler, T.; Wessen, A.; Scalice, D.

    2010-12-01

    Sponsored by NASA’s Planetary Science Division, and managed by the Jet Propulsion Laboratory, the Planetary Science Summer School prepares the next generation of engineers and scientists to participate in future solar system exploration missions. Participants learn the mission life cycle, roles of scientists and engineers in a mission environment, mission design interconnectedness and trade-offs, and the importance of teamwork. For this professional development opportunity, applicants are sought who have a strong interest and experience in careers in planetary exploration, and who are science and engineering post-docs, recent PhDs, and doctoral students, and faculty teaching such students. Disciplines include planetary science, geoscience, geophysics, environmental science, aerospace engineering, mechanical engineering, and materials science. Participants are selected through a competitive review process, with selections based on the strength of the application and advisor’s recommendation letter. Under the mentorship of a lead engineer (Dr. Charles Budney), students select, design, and develop a mission concept in response to the NASA New Frontiers Announcement of Opportunity. They develop their mission in the JPL Advanced Projects Design Team (Team X) environment, which is a cross-functional multidisciplinary team of professional engineers that utilizes concurrent engineering methodologies to complete rapid design, analysis and evaluation of mission concept designs. About 36 students participate each year, divided into two summer sessions. In advance of an intensive week-long session in the Project Design Center at JPL, students select the mission and science goals during a series of six weekly WebEx/telecons, and develop a preliminary suite of instrumentation and a science traceability matrix. Students assume both a science team and a mission development role with JPL Team X mentors. Once at JPL, students participate in a series of Team X project design sessions, during which their mentors aid them in finalizing their mission design and instrument suite, and in making the necessary trade-offs to stay within the cost cap. Tours of JPL facilities highlight the end-to-end life cycle of a mission. At week’s end, students present their Concept Study to a “proposal review board” of JPL scientists and engineers and NASA Headquarters executives, who feed back the strengths and weaknesses of their proposal and mission design. The majority of students come from top US universities with planetary science or engineering programs, such as Brown University, MIT, Georgia Tech, University of Colorado, Caltech, Stanford, University of Arizona, UCLA, and University of Michigan. Almost a third of Planetary Science Summer School alumni from the last 10 years of the program are currently employed by NASA or JPL. The Planetary Science Summer School is implemented by the JPL Education Office in partnership with JPL’s Team X Project Design Center.

  18. Processing multilevel secure test and evaluation information

    NASA Astrophysics Data System (ADS)

    Hurlburt, George; Hildreth, Bradley; Acevedo, Teresa

    1994-07-01

    The Test and Evaluation Community Network (TECNET) is building a Multilevel Secure (MLS) system. This system features simultaneous access to classified and unclassified information and easy access through widely available communications channels. It provides the necessary separation of classification levels, assured through the use of trusted system design techniques, security assessments and evaluations. This system enables cleared T&E users to view and manipulate classified and unclassified information resources either using a single terminal interface or multiple windows in a graphical user interface. TECNET is in direct partnership with the National Security Agency (NSA) to develop and field the MLS TECNET capability in the near term. The centerpiece of this partnership is a state-of-the-art Concurrent Systems Security Engineering (CSSE) process. In developing the MLS TECNET capability, TECNET and NSA are providing members, with various expertise and diverse backgrounds, to participate in the CSSE process. The CSSE process is founded on the concepts of both Systems Engineering and Concurrent Engineering. Systems Engineering is an interdisciplinary approach to evolve and verify an integrated and life cycle balanced set of system product and process solutions that satisfy customer needs (ASD/ENS-MIL STD 499B 1992). Concurrent Engineering is design and development using the simultaneous, applied talents of a diverse group of people with the appropriate skills. Harnessing diverse talents to support CSSE requires active participation by team members in an environment that both respects and encourages diversity.

  19. Teaching the Next Generation of Scientists and Engineers the NASA Design Process

    NASA Technical Reports Server (NTRS)

    Caruso, Pamela W.; Benfield, Michael P. J.; Justice, Stefanie H.

    2011-01-01

    The Integrated Product Team (IPT) program, led by The University of Alabama in Huntsville (UAH), is a multidisciplinary, multi-university, multi-level program whose goal is to provide opportunities for high school and undergraduate scientists and engineers to translate stakeholder needs and requirements into viable engineering design solutions via a distributed multidisciplinary team environment. The current program supports three projects. The core of the program is the two-semester senior design experience where science, engineering, and liberal arts undergraduate students from UAH, the College of Charleston, Southern University at Baton Rouge, and Ecole Suprieure des Techniques Aronautiques et de Construction Automobile (ESTACA) in Paris, France form multidisciplinary competitive teams to develop system concepts of interest to the local aerospace community. External review boards form to provide guidance and feedback throughout the semester and to ultimately choose a winner from the competing teams. The other two projects, the Innovative Student Project for the Increased Recruitment of Engineering and Science Students (InSPIRESS) Level I and Level II focus exclusively on high school students. InSPIRESS Level I allows high schools to develop a payload to be accommodated on the system being developed by senior design experience teams. InSPIRESS Level II provides local high school students first-hand experience in the senior design experience by allowing them to develop a subsystem or component of the UAH-led system over the two semesters. This program provides a model for NASA centers to engage the local community to become more involved in design projects.

  20. The U.S. Army Corps of Engineers (USACE) in Stability Operations

    DTIC Science & Technology

    2008-12-12

    advance (FEST-A) or forward engineer support team-main (FEST- M ) is another vital asset that USACE can provide in stability operations. The FEST- M ...engineer units and if deployed with a FEST- M will fall under that element. FEST are small teams with specialized expertise based on where they are...in Afghanistan and set the conditions for the creation of an Afghan political system ( Donini et al., 46). Major reconstruction projects were not

  1. Collaborative engineering and design management for the Hobby-Eberly Telescope tracker upgrade

    NASA Astrophysics Data System (ADS)

    Mollison, Nicholas T.; Hayes, Richard J.; Good, John M.; Booth, John A.; Savage, Richard D.; Jackson, John R.; Rafal, Marc D.; Beno, Joseph H.

    2010-07-01

    The engineering and design of systems as complex as the Hobby-Eberly Telescope's* new tracker require that multiple tasks be executed in parallel and overlapping efforts. When the design of individual subsystems is distributed among multiple organizations, teams, and individuals, challenges can arise with respect to managing design productivity and coordinating successful collaborative exchanges. This paper focuses on design management issues and current practices for the tracker design portion of the Hobby-Eberly Telescope Wide Field Upgrade project. The scope of the tracker upgrade requires engineering contributions and input from numerous fields including optics, instrumentation, electromechanics, software controls engineering, and site-operations. Successful system-level integration of tracker subsystems and interfaces is critical to the telescope's ultimate performance in astronomical observation. Software and process controls for design information and workflow management have been implemented to assist the collaborative transfer of tracker design data. The tracker system architecture and selection of subsystem interfaces has also proven to be a determining factor in design task formulation and team communication needs. Interface controls and requirements change controls will be discussed, and critical team interactions are recounted (a group-participation Failure Modes and Effects Analysis [FMEA] is one of special interest). This paper will be of interest to engineers, designers, and managers engaging in multi-disciplinary and parallel engineering projects that require coordination among multiple individuals, teams, and organizations.

  2. Improving the Flow

    NASA Technical Reports Server (NTRS)

    2004-01-01

    In early 1995, NASA s Glenn Research Center (then Lewis Research Center) formed an industry-government team with several jet engine companies to develop the National Combustion Code (NCC), which would help aerospace engineers solve complex aerodynamics and combustion problems in gas turbine, rocket, and hypersonic engines. The original development team consisted of Allison Engine Company (now Rolls-Royce Allison), CFD Research Corporation, GE Aircraft Engines, Pratt and Whitney, and NASA. After the baseline beta version was established in July 1998, the team focused its efforts on consolidation, streamlining, and integration, as well as enhancement, evaluation, validation, and application. These activities, mainly conducted at NASA Glenn, led to the completion of NCC version 1.0 in October 2000. NCC version 1.0 features high-fidelity representation of complex geometry, advanced models for two-phase turbulent combustion, and massively parallel computing. Researchers and engineers at Glenn have been using NCC to provide analysis and design support for various aerospace propulsion technology development projects. NASA transfers NCC technology to external customers using non- exclusive Space Act Agreements. Glenn researchers also communicate research and development results derived from NCC's further development through publications and special sessions at technical conferences.

  3. Team Based Engineering Design Thinking

    ERIC Educational Resources Information Center

    Mentzer, Nathan

    2012-01-01

    The objective of this research was to explore design thinking among teams of high school students. This objective is encompassed in the research question driving this inquiry: How do teams of high school students allocate time across stages of design? Design thinking on the professional level typically occurs in a team environment. Many…

  4. 33 CFR 385.21 - Quality control.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... will be produced by a Project Delivery Team. The quality control plan shall be included in the Project... Corps of Engineers and the non-Federal sponsor shall establish a Technical Review Team to conduct.... The members of the Technical Review Team shall be independent of the Project Delivery Team and the...

  5. Team Based Engineering Design Thinking

    ERIC Educational Resources Information Center

    Mentzer, Nathan

    2014-01-01

    The objective of this research was to explore design thinking among teams of high school students. This objective was encompassed in the research question driving the inquiry: How do teams of high school students allocate time across stages of design? Design thinking on the professional level typically occurs in a team environment. Many…

  6. Peer review in design: Understanding the impact of collaboration on the review process and student perception

    NASA Astrophysics Data System (ADS)

    Mandala, Mahender Arjun

    A cornerstone of design and design education is frequent situated feedback. With increasing class sizes, and shrinking financial and human resources, providing rich feedback to students becomes increasingly difficult. In the field of writing, web-based peer review--the process of utilizing equal status learners within a class to provide feedback to each other on their work using networked computing systems--has been shown to be a reliable and valid source of feedback in addition to improving student learning. Designers communicate in myriad ways, using the many languages of design and combining visual and descriptive information. This complex discourse of design intent makes peer reviews by design students ambiguous and often not helpful to the receivers of this feedback. Furthermore, engaging students in the review process itself is often difficult. Teams can complement individual diversity and may assist novice designers collectively resolve complex task. However, teams often incur production losses and may be impacted by individual biases. In the current work, we look at utilizing a collaborative team of reviewers, working collectively and synchronously, in generating web based peer reviews in a sophomore engineering design class. Students participated in a cross-over design, conducting peer reviews as individuals and collaborative teams in parallel sequences. Raters coded the feedback generated on the basis of their appropriateness and accuracy. Self-report surveys and passive observation of teams conducting reviews captured student opinion on the process, its value, and the contrasting experience they had conducting team and individual reviews. We found team reviews generated better quality feedback in comparison to individual reviews. Furthermore, students preferred conducting reviews in teams, finding the process 'fun' and engaging. We observed several learning benefits of using collaboration in reviewing including improved understanding of the assessment criteria, roles, expectations, and increased team reflection. These results provide insight into how to improve the review process for instructors and researchers, and forms a basis for future research work in this area. With respect to facilitating peer review process in design based classrooms, we also present recommendations for creating effective review system design and implementation in classroom supported by research and practical experience.

  7. Expanded Guidance for NASA Systems Engineering. Volume 2: Crosscutting Topics, Special Topics, and Appendices

    NASA Technical Reports Server (NTRS)

    Hirshorn, Steven R.

    2017-01-01

    Historically, most successful NASA projects have depended on effectively blending project management, systems engineering, and technical expertise among NASA, contractors, and third parties. Underlying these successes are a variety of agreements (e.g., contract, memorandum of understanding, grant, cooperative agreement) between NASA organizations or between NASA and other Government agencies, Government organizations, companies, universities, research laboratories, and so on. To simplify the discussions, the term "contract" is used to encompass these agreements. This section focuses on the NASA systems engineering activities pertinent to awarding a contract, managing contract performance, and completing a contract. In particular, NASA systems engineering interfaces to the procurement process are covered, since the NASA engineering technical team plays a key role in the development and evaluation of contract documentation. Contractors and third parties perform activities that supplement (or substitute for) the NASA project technical team accomplishment of the NASA common systems engineering technical process activities and requirements outlined in this guide. Since contractors might be involved in any part of the systems engineering life cycle, the NASA project technical team needs to know how to prepare for, allocate or perform, and implement surveillance of technical activities that are allocated to contractors.

  8. A pilot study to evaluate the utility of live training (LIVEX) in the operational preparedness of UK military trauma teams.

    PubMed

    Smith, J E; Withnall, R D J; Rickard, R F; Lamb, D; Sitch, A; Hodgetts, T J

    2016-12-01

    With the end of UK military operations in Iraq and Afghanistan, it is essential that peacetime training of Defence Medical Services (DMS) trauma teams ensures appropriate future preparedness. A new model of pre-deployment training involves placement of formed military trauma teams into civilian trauma centres. This study evaluates the benefit of 'live training during an exercise period' (LIVEX) for DMS trauma teams. A cross-sectional questionnaire-based survey of participants was conducted. Quantitative data were collected prior to the start and on the final day. Written reports were collected from the coordinators. Thematic analysis was used to identify emergent themes in a supplementary, qualitative analysis. Each team comprised 13 personnel and results should be interpreted with knowledge of this small sample size. The response rate for both the pre-LIVEX and post-LIVEX questionnaire was 100%. By the end of the week, 89% of participants (n=23) stated LIVEX was an 'appropriate or very appropriate' way of preparing for an operational role compared with 40% (n=9) before the exercise (p<0.01). However, completing LIVEX made no difference to participants' personal perception of their own operational preparedness. Thematic analysis suggested greater training benefit for more junior members of the team; from Regulars and Reservists training together; and from two-way exchange of information between DMS and National Health Service medical staffs. Completing LIVEX made no statistically significant difference to participants' personal perception of their own operational preparedness, but the perception of LIVEX as an appropriate training platform improved significantly after conducting the training exercise. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/.

  9. Autonomous onboard crew operations: A review and developmental approach

    NASA Technical Reports Server (NTRS)

    Rogers, J. G.

    1982-01-01

    A review of the literature generated by an intercenter mission approach and consolidation team and their contractors was performed to obtain background information on the development of autonomous operations concepts for future space shuttle and space platform missions. The Boeing 757/767 flight management system was examined to determine the relevance for transfer of the developmental approach and technology to the performance of the crew operations function. In specific, the engine indications and crew alerting system was studied to determine the relevance of this display for the performance of crew operations onboard the vehicle. It was concluded that the developmental approach and technology utilized in the aeronautics industry would be appropriate for development of an autonomous operations concept for the space platform.

  10. Engineering performance metrics

    NASA Astrophysics Data System (ADS)

    Delozier, R.; Snyder, N.

    1993-03-01

    Implementation of a Total Quality Management (TQM) approach to engineering work required the development of a system of metrics which would serve as a meaningful management tool for evaluating effectiveness in accomplishing project objectives and in achieving improved customer satisfaction. A team effort was chartered with the goal of developing a system of engineering performance metrics which would measure customer satisfaction, quality, cost effectiveness, and timeliness. The approach to developing this system involved normal systems design phases including, conceptual design, detailed design, implementation, and integration. The lessons teamed from this effort will be explored in this paper. These lessons learned may provide a starting point for other large engineering organizations seeking to institute a performance measurement system accomplishing project objectives and in achieving improved customer satisfaction. To facilitate this effort, a team was chartered to assist in the development of the metrics system. This team, consisting of customers and Engineering staff members, was utilized to ensure that the needs and views of the customers were considered in the development of performance measurements. The development of a system of metrics is no different than the development of any type of system. It includes the steps of defining performance measurement requirements, measurement process conceptual design, performance measurement and reporting system detailed design, and system implementation and integration.

  11. Domain-specific languages and diagram customization for a concurrent engineering environment

    NASA Astrophysics Data System (ADS)

    Cole, B.; Dubos, G.; Banazadeh, P.; Reh, J.; Case, K.; Wang, Y.; Jones, S.; Picha, F.

    A major open question for advocates of Model-Based Systems Engineering (MBSE) is the question of how system and subsystem engineers will work together. The Systems Modeling Language (SysML), like any language intended for a large audience, is in tension between the desires for simplicity and for expressiveness. In order to be more expressive, many specialized language elements may be introduced, which will unfortunately make a complete understanding of the language a more daunting task. While this may be acceptable for systems modelers, it will increase the challenge of including subsystem engineers in the modeling effort. One possible answer to this situation is the use of Domain-Specific Languages (DSL), which are fully supported by the Unified Modeling Language (UML). SysML is in fact a DSL for systems engineering. The expressive power of a DSL can be enhanced through the use of diagram customization. Various domains have already developed their own schematic vocabularies. Within the space engineering community, two excellent examples are the propulsion and telecommunication subsystems. A return to simple box-and-line diagrams (e.g., the SysML Internal Block Diagram) are in many ways a step backward. In order allow subsystem engineers to contribute directly to the model, it is necessary to make a system modeling tool at least approximate in accessibility to drawing tools like Microsoft PowerPoint and Visio. The challenge is made more extreme in a concurrent engineering environment, where designs must often be drafted in an hour or two. In the case of the Jet Propulsion Laboratory's Team X concurrent design team, a subsystem is specified using a combination of PowerPoint for drawing and Excel for calculation. A pilot has been undertaken in order to meld the drawing portion and the production of master equipment lists (MELs) via a SysML authoring tool, MagicDraw. Team X currently interacts with its customers in a process of sharing presentations. There are severa- inefficiencies that arise from this situation. The first is that a customer team must wait two weeks to a month (which is 2-4 times the duration of most Team X studies themselves) for a finalized, detailed design description. Another is that this information must be re-entered by hand into the set of engineering artifacts and design tools that the mission concept team uses after a study is complete. Further, there is no persistent connection to Team X or institutionally shared formulation design tools and data after a given study, again reducing the direct reuse of designs created in a Team X study. This paper presents the underpinnings of subsystem DSLs as they were developed for this pilot. This includes specialized semantics for different domains as well as the process by which major categories of objects were derived in support of defining the DSLs. The feedback given to us by the domain experts on usability, along with a pilot study with the partial inclusion of these tools is also discussed.

  12. Domain-Specific Languages and Diagram Customization for a Concurrent Engineering Environment

    NASA Technical Reports Server (NTRS)

    Cole, Bjorn; Dubos, Greg; Banazadeh, Payam; Reh, Jonathan; Case, Kelley; Wang, Yeou-Fang; Jones, Susan; Picha, Frank

    2013-01-01

    A major open question for advocates of Model-Based Systems Engineering (MBSE) is the question of how system and subsystem engineers will work together. The Systems Modeling Language (SysML), like any language intended for a large audience, is in tension between the desires for simplicity and for expressiveness. In order to be more expressive, many specialized language elements may be introduced, which will unfortunately make a complete understanding of the language a more daunting task. While this may be acceptable for systems modelers, it will increase the challenge of including subsystem engineers in the modeling effort. One possible answer to this situation is the use of Domain-Specific Languages (DSL), which are fully supported by the Unified Modeling Language (UML). SysML is in fact a DSL for systems engineering. The expressive power of a DSL can be enhanced through the use of diagram customization. Various domains have already developed their own schematic vocabularies. Within the space engineering community, two excellent examples are the propulsion and telecommunication subsystems. A return to simple box-and-line diagrams (e.g., the SysML Internal Block Diagram) are in many ways a step backward. In order allow subsystem engineers to contribute directly to the model, it is necessary to make a system modeling tool at least approximate in accessibility to drawing tools like Microsoft PowerPoint and Visio. The challenge is made more extreme in a concurrent engineering environment, where designs must often be drafted in an hour or two. In the case of the Jet Propulsion Laboratory's Team X concurrent design team, a subsystem is specified using a combination of PowerPoint for drawing and Excel for calculation. A pilot has been undertaken in order to meld the drawing portion and the production of master equipment lists (MELs) via a SysML authoring tool, MagicDraw. Team X currently interacts with its customers in a process of sharing presentations. There are several inefficiencies that arise from this situation. The first is that a customer team must wait two weeks to a month (which is 2-4 times the duration of most Team X studies themselves) for a finalized, detailed design description. Another is that this information must be re-entered by hand into the set of engineering artifacts and design tools that the mission concept team uses after a study is complete. Further, there is no persistent connection to Team X or institutionally shared formulation design tools and data after a given study, again reducing the direct reuse of designs created in a Team X study. This paper presents the underpinnings of subsystem DSLs as they were developed for this pilot. This includes specialized semantics for different domains as well as the process by which major categories of objects were derived in support of defining the DSLs. The feedback given to us by the domain experts on usability, along with a pilot study with the partial inclusion of these tools is also discussed.

  13. Using wikis to investigate communication, collaboration and engagement in Capstone engineering design projects

    NASA Astrophysics Data System (ADS)

    Berthoud, L.; Gliddon, J.

    2018-03-01

    In today's global Aerospace industry, virtual workspaces are commonly used for collaboration between geographically distributed multidisciplinary teams. This study investigated the use of wikis to look at communication, collaboration and engagement in 'Capstone' team design projects at the end of an engineering degree. Wikis were set up for teams of engineering students from different disciplinary backgrounds and years. The students' perception of the usefulness of the tool were surveyed and the user contribution statistics and content categorisation were analysed for a case study wiki. Recommendations and lessons learned for the deployment of wikis are provided for interested academic staff from other institutions. Wikis were found to be of limited use to investigate levels of communication and collaboration in this study, but may be of interest in other contexts. Wikis were considered a potentially useful tool to track engagement for Capstone design projects in engineering subjects.

  14. An Example of Concurrent Engineering

    NASA Technical Reports Server (NTRS)

    Rowe, Sidney; Whitten, David; Cloyd, Richard; Coppens, Chris; Rodriguez, Pedro

    1998-01-01

    The Collaborative Engineering Design and Analysis Room (CEDAR) facility allows on-the- spot design review capability for any project during all phases of development. The required disciplines assemble in this facility to work on any problems (analysis, manufacturing, inspection, etc.) associated with a particular design. A small highly focused team of specialists can meet in this room to better expedite the process of developing a solution to an engineering task within the framework of the constraints that are unique to each discipline. This facility provides the engineering tools and translators to develop a concept within the confines of the room or with remote team members that could access the team's data from other locations. The CEDAR area is envisioned as excellent for failure investigation meetings to be conducted where the computer capabilities can be utilized in conjunction with the Smart Board display to develop failure trees, brainstorm failure modes, and evaluate possible solutions.

  15. KSC-03pd0270

    NASA Image and Video Library

    2003-02-05

    KENNEDY SPACE CENTER, FLA. -- Members of the Recovery Management Team at KSC are at work in the Operations Support Building. They are part of the investigation into the accident that claimed orbiter Columbia and her crew of seven on Feb. 1, 2003, over East Texas as they returned to Earth after a 16-day research mission. Seated around the table (clockwise from far left) are Chris Hasselbring, Landing Operations, USA (co-chair of the Response Management Team); Don Maxwell, Safety, United Space Alliance (USA); Russ DeLoach, chief, Shuttle Mission Assurance Branch, NASA; George Jacobs, Shuttle Engineering; Jeff Campbell, Shuttle Engineering; Denny Gagen, Landing Recovery Manager (second co-chair of the team); and Dave Rainer, Launch and Landing Operations. The team is coordinating KSC technical support and assets to the Mishap Investigation Team in Barksdale, La., and providing support for the Recovery teams in Los Angeles, Texas, New Mexico, Arizona and California. In addition, the team is following up on local leads pertaining to potential debris in the KSC area. .

  16. KSC-03pd0271

    NASA Image and Video Library

    2003-02-05

    KENNEDY SPACE CENTER, FLA. - Two members of the Recovery Management Team at KSC are at work in the Operations Support Building. At left is Don Maxwell, Safety, United Space Alliance, and at right is Larry Ulmer, Safety, NASA. They are part of the investigation into the accident that claimed orbiter Columbia and her crew of seven on Feb. 1, 2003, over East Texas as they returned to Earth after a 16-day research mission. Other team members are Russ DeLoach, chief, Shuttle Mission Assurance Branch, NASA; George Jacobs, Shuttle Engineering; Jeff Campbell, Shuttle Engineering; Dave Rainer, Launch and Landing Operations; and the two co-chairs of the Response Management Team, Denny Gagen, Landing Recovery Manager, and Chris Hasselbring, Landing Operations, USA. The team is coordinating KSC technical support and assets to the Mishap Investigation Team in Barksdale, La., and providing support for the Recovery teams in Los Angeles, Texas, New Mexico, Arizona and California. In addition, the team is following up on local leads pertaining to potential debris in the KSC area. .

  17. A Simplified Model of Human Alcohol Metabolism That Integrates Biotechnology and Human Health into a Mass Balance Team Project

    ERIC Educational Resources Information Center

    Yang, Allen H. J.; Dimiduk, Kathryn; Daniel, Susan

    2011-01-01

    We present a simplified human alcohol metabolism model for a mass balance team project. Students explore aspects of engineering in biotechnology: designing/modeling biological systems, testing the design/model, evaluating new conditions, and exploring cutting-edge "lab-on-a-chip" research. This project highlights chemical engineering's impact on…

  18. Interdisciplinary Team-Teaching Experience for a Computer and Nuclear Energy Course for Electrical and Computer Engineering Students

    ERIC Educational Resources Information Center

    Kim, Charles; Jackson, Deborah; Keiller, Peter

    2016-01-01

    A new, interdisciplinary, team-taught course has been designed to educate students in Electrical and Computer Engineering (ECE) so that they can respond to global and urgent issues concerning computer control systems in nuclear power plants. This paper discusses our experience and assessment of the interdisciplinary computer and nuclear energy…

  19. Observing Engineering Student Teams from the Organization Behavior Perspective Using Linguistic Analysis of Student Reflections and Focus Group Interviews

    ERIC Educational Resources Information Center

    Kearney, Kerri S.; Damron, Rebecca; Sohoni, Sohum

    2015-01-01

    This paper investigates group/team development in computer engineering courses at a University in the Central USA from the perspective of organization behavior theory, specifically Tuckman's model of the stages of group development. The investigation, conducted through linguistic analysis of student reflection essays, and through focus group…

  20. 40 CFR 86.1829-01 - Durability and emission testing requirements; waivers.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... manufacturer's engineering evaluation of appropriate high-altitude emission testing, all light-duty vehicles..., development tests, or other appropriate information and good engineering judgment. (2) Evaporative/Refueling... manufacturer's engineering evaluation of appropriate testing and/or design parameters, all light-duty vehicles...

  1. KSC-2013-3534

    NASA Image and Video Library

    2013-09-11

    CAPE CANAVERAL, Fla. – Engineers fine-tune a remote-controlled helicopter before it takes off. The helicopter is equipped with a unique set of sensors and software and was assembled by a team of engineers from NASA's Johnson Space Center for a competition at the agency's Kennedy Space Center. Teams from Johnson, Kennedy and Marshall Space Flight Center competed in an unmanned aerial systems event to evaluate designs and work by engineers learning new specialties. The competition took place at the Shuttle Landing Facility at Kennedy. Photo credit: NASA/Dmitri Gerondidakis

  2. Surface contamination analysis technology team overview

    NASA Astrophysics Data System (ADS)

    Burns, H. Dewitt, Jr.

    1996-11-01

    The surface contamination analysis technology (SCAT) team was originated as a working roup of NASA civil service, Space Shuttle contractor, and university groups. Participating members of the SCAT Team have included personnel from NASA Marshall Space Flight Center's Materials and Processes Laboratory and Langley Research Center's Instrument Development Group; contractors-Thiokol Corporation's Inspection Technology Group, AC Engineering support contractor, Aerojet, SAIC, and Lockheed MArtin/Oak Ridge Y-12 support contractor and Shuttle External Tank prime contractor; and the University of Alabama in Huntsville's Center for Robotics and Automation. The goal of the SCAT team as originally defined was to develop and integrate a multi-purpose inspection head for robotic application to in-process inspection of contamination sensitive surfaces. One area of interest was replacement of ozone depleting solvents currently used for surface cleanliness verification. The team approach brought together the appropriate personnel to determine what surface inspection techniques were applicable to multi-program surface cleanliness inspection. Major substrates of interest were chosen to simulate space shuttle critical bonding surface or surfaces sensitive to contamination such as fuel system component surfaces. Inspection techniques evaluated include optically stimulated electron emission or photoelectron emission; Fourier transform infrared spectroscopy; near infrared fiber optic spectroscopy; and, ultraviolet fluorescence. Current plans are to demonstrate an integrated system in MSFC's Productivity Enhancement Complex within five years from initiation of this effort in 1992. Instrumentation specifications and designs developed under this effort include a portable diffuse reflectance FTIR system built by Surface Optics Corporation and a third generation optically stimulated electron emission system built by LaRC. This paper will discuss the evaluation of the various techniques on a number of substrate materials contaminated with hydrocarbons, silicones, and fluorocarbons. Discussion will also include standards development for instrument calibration and testing.

  3. Thermal Protection System Imagery Inspection Management System -TIIMS

    NASA Technical Reports Server (NTRS)

    Goza, Sharon; Melendrez, David L.; Henningan, Marsha; LaBasse, Daniel; Smith, Daniel J.

    2011-01-01

    TIIMS is used during the inspection phases of every mission to provide quick visual feedback, detailed inspection data, and determination to the mission management team. This system consists of a visual Web page interface, an SQL database, and a graphical image generator. These combine to allow a user to ascertain quickly the status of the inspection process, and current determination of any problem zones. The TIIMS system allows inspection engineers to enter their determinations into a database and to link pertinent images and video to those database entries. The database then assigns criteria to each zone and tile, and via query, sends the information to a graphical image generation program. Using the official TIPS database tile positions and sizes, the graphical image generation program creates images of the current status of the orbiter, coloring zones, and tiles based on a predefined key code. These images are then displayed on a Web page using customized JAVA scripts to display the appropriate zone of the orbiter based on the location of the user's cursor. The close-up graphic and database entry for that particular zone can then be seen by selecting the zone. This page contains links into the database to access the images used by the inspection engineer when they make the determination entered into the database. Status for the inspection zones changes as determinations are refined and shown by the appropriate color code.

  4. The James Webb Space Telescope RealWorld-InWorld Design Challenge: Involving Professionals in a Virtual Classroom

    NASA Astrophysics Data System (ADS)

    Masetti, Margaret; Bowers, S.

    2011-01-01

    Students around the country are becoming experts on the James Webb Space Telescope by designing solutions to two of the design challenges presented by this complex mission. RealWorld-InWorld has two parts; the first (the Real World portion) has high-school students working face to face in their classroom as engineers and scientists. The InWorld phase starts December 15, 2010 as interested teachers and their teams of high school students register to move their work into a 3D multi-user virtual world environment. At the start of this phase, college students from all over the country choose a registered team to lead InWorld. Each InWorld team is also assigned an engineer or scientist mentor. In this virtual world setting, each team refines their design solutions and creates a 3D model of the Webb telescope. InWorld teams will use 21st century tools to collaborate and build in the virtual world environment. Each team will learn, not only from their own team members, but will have the opportunity to interact with James Webb Space Telescope researchers through the virtual world setting, which allows for synchronous interactions. Halfway through the challenge, design solutions will be critiqued and a mystery problem will be introduced for each team. The top five teams will be invited to present their work during a synchronous Education Forum April 14, 2011. The top team will earn scholarships and technology. This is an excellent opportunity for professionals in both astronomy and associated engineering disciplines to become involved with a unique educational program. Besides the chance to mentor a group of interested students, there are many opportunities to interact with the students as a guest, via chats and presentations.

  5. ADVANCED MANUFACTURING TEAM

    NASA Image and Video Library

    2016-03-17

    KEN COOPER, TEAM LEAD OF MSFC’S ADVANCED MANUFACTURING TEAM, WITH NICKEL ALLOY 718 PARTS FABRICATED USING THE M1 SELECTIVE LASER MELTING SYSTEM. THE M1 MACHINE IS DEDICATED TO BUILDING QUALIFICATION SAMPLES AND HARDWARE DEMONSTRATORS FOR THE RS25 ENGINE PROJECT.

  6. Installation Restoration Program Phase 1: Records Search of Hanscom Air Force Base, Massachusetts

    DTIC Science & Technology

    1984-08-01

    Engineer o Kevin R. Boyer, P.E., Project Manager and Civil Engineer o Alfred N. Wickline, Records Search Team Leader and Soil Scientist o Claudia A...INVESTIGATION TEAM :I.., 𔃾 44. ’m4, Use or disclosure of proposal data is subject to the restriction on the Title page of this Proposal. KEVIN R... KEVIN R. BOYER, P.E. Page 2 of 3 While working under the USEPA’s Field Investigation Team (FIT) program, Mr. Boyer was part of a quality assurance (QA

  7. NASA Planetary Science Summer School: Preparing the Next Generation of Planetary Mission Leaders

    NASA Astrophysics Data System (ADS)

    Lowes, L. L.; Budney, C. J.; Sohus, A.; Wheeler, T.; Urban, A.; NASA Planetary Science Summer School Team

    2011-12-01

    Sponsored by NASA's Planetary Science Division, and managed by the Jet Propulsion Laboratory, the Planetary Science Summer School prepares the next generation of engineers and scientists to participate in future solar system exploration missions. Participants learn the mission life cycle, roles of scientists and engineers in a mission environment, mission design interconnectedness and trade-offs, and the importance of teamwork. For this professional development opportunity, applicants are sought who have a strong interest and experience in careers in planetary exploration, and who are science and engineering post-docs, recent PhDs, and doctoral students, and faculty teaching such students. Disciplines include planetary science, geoscience, geophysics, environmental science, aerospace engineering, mechanical engineering, and materials science. Participants are selected through a competitive review process, with selections based on the strength of the application and advisor's recommendation letter. Under the mentorship of a lead engineer (Dr. Charles Budney), students select, design, and develop a mission concept in response to the NASA New Frontiers Announcement of Opportunity. They develop their mission in the JPL Advanced Projects Design Team (Team X) environment, which is a cross-functional multidisciplinary team of professional engineers that utilizes concurrent engineering methodologies to complete rapid design, analysis and evaluation of mission concept designs. About 36 students participate each year, divided into two summer sessions. In advance of an intensive week-long session in the Project Design Center at JPL, students select the mission and science goals during a series of six weekly WebEx/telecons, and develop a preliminary suite of instrumentation and a science traceability matrix. Students assume both a science team and a mission development role with JPL Team X mentors. Once at JPL, students participate in a series of Team X project design sessions, during which their mentors aid them in finalizing their mission design and instrument suite, and in making the necessary trade-offs to stay within the cost cap. Tours of JPL facilities highlight the end-to-end life cycle of a mission. At week's end, students present their Concept Study to a "proposal review board" of JPL scientists and engineers and NASA Headquarters executives, who feed back the strengths and weaknesses of their proposal and mission design. A survey of Planetary Science Summer School alumni administered in summer of 2011 provides information on the program's impact on students' career choices and leadership roles as they pursue their employment in planetary science and related fields. Preliminary results will be discussed during the session. Almost a third of the approximately 450 Planetary Science Summer School alumni from the last 10 years of the program are currently employed by NASA or JPL. The Planetary Science Summer School is implemented by the JPL Education Office in partnership with JPL's Team X Project Design Center.

  8. A continuous quality improvement team approach to adverse drug reaction reporting.

    PubMed

    Flowers, P; Dzierba, S; Baker, O

    1992-07-01

    Crossfunctional teams can generate more new ideas, concepts, and possible solutions than does a department-based process alone. Working collaboratively can increase knowledge of teams using CQI approaches and appropriate tools. CQI produces growth and development at multiple levels resulting from involvement in the process of incremental improvement.

  9. 42 CFR 441.365 - Periodic evaluation, assessment, and review.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... other appropriate mental health or social service personnel who are knowledgeable about geriatric mental illness. (c) Financial interests and employment of review team members. (1) No member of a review team may... has had a professional relationship. (d) Number and location of review teams. A sufficient number of...

  10. 42 CFR 441.365 - Periodic evaluation, assessment, and review.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... other appropriate mental health or social service personnel who are knowledgeable about geriatric mental illness. (c) Financial interests and employment of review team members. (1) No member of a review team may... has had a professional relationship. (d) Number and location of review teams. A sufficient number of...

  11. 42 CFR 441.365 - Periodic evaluation, assessment, and review.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... other appropriate mental health or social service personnel who are knowledgeable about geriatric mental illness. (c) Financial interests and employment of review team members. (1) No member of a review team may... has had a professional relationship. (d) Number and location of review teams. A sufficient number of...

  12. 40 CFR 86.1829-01 - Durability and emission testing requirements; waivers.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... manufacturer's engineering evaluation of appropriate high-altitude emission testing, all light-duty vehicles... tests, development tests, or other appropriate information and good engineering judgment. (B) In lieu of... emission tests, development tests, or other appropriate information and good engineering judgment. (C) A...

  13. Communication Skills to Develop Trusting Relationships on Global Virtual Engineering Capstone Teams

    ERIC Educational Resources Information Center

    Zaugg, Holt; Davies, Randall S.

    2013-01-01

    As universities seek to provide cost-effective, cross-cultural experiences using global virtual (GV) teams, the "soft" communication skills typical of all teams, increases in importance for GV teams. Students need to be taught how to navigate through cultural issues and virtual tool issues to build strong trusting relationships with…

  14. Survey Tools for Faculty to Quickly Assess Multidisciplinary Team Dynamics in Capstone Courses

    ERIC Educational Resources Information Center

    Solnosky, Ryan; Fairchild, Joshua

    2017-01-01

    Many engineering faculty have limited skills and/or assessment tools to evaluate team dynamics in multidisciplinary team-based capstone courses. Rapidly deployable tools are needed here to provide proactive feedback to teams to facilitate deeper learning. Two surveys were developed based on industrial and organizational psychology theories around…

  15. JPL Innovation Foundry

    NASA Technical Reports Server (NTRS)

    Sherwood, Brent; McCleese, Daniel

    2012-01-01

    Space science missions are increasingly challenged today: in ambition, by increasingly sophisticated hypotheses tested; in development, by the increasing complexity of advanced technologies; in budgeting, by the decline of flagship-class mission opportunities; in management, by expectations for breakthrough science despite a risk-averse programmatic climate; and in planning, by increasing competition for scarce resources. How are the space-science missions of tomorrow being formulated? The paper describes the JPL Innovation Foundry, created in 2011, to respond to this evolving context. The Foundry integrates methods, tools, and experts that span the mission concept lifecycle. Grounded in JPL's heritage of missions, flight instruments, mission proposals, and concept innovation, the Foundry seeks to provide continuity of support and cost-effective, on-call access to the right domain experts at the right time, as science definition teams and Principal Investigators mature mission ideas from "cocktail napkin" to PDR. The Foundry blends JPL capabilities in proposal development and concurrent engineering, including Team X, with new approaches for open-ended concept exploration in earlier, cost-constrained phases, and with ongoing research and technology projects. It applies complexity and cost models, projectformulation lessons learned, and strategy analyses appropriate to each level of concept maturity. The Foundry is organizationally integrated with JPL formulation program offices; staffed by JPL's line organizations for engineering, science, and costing; and overseen by senior Laboratory leaders to assure experienced coordination and review. Incubation of each concept is tailored depending on its maturity and proposal history, and its highest leverage modeling and analysis needs.

  16. Enabling performance skills: Assessment in engineering education

    NASA Astrophysics Data System (ADS)

    Ferrone, Jenny Kristina

    Current reform in engineering education is part of a national trend emphasizing student learning as well as accountability in instruction. Assessing student performance to demonstrate accountability has become a necessity in academia. In newly adopted criterion proposed by the Accreditation Board for Engineering and Technology (ABET), undergraduates are expected to demonstrate proficiency in outcomes considered essential for graduating engineers. The case study was designed as a formative evaluation of freshman engineering students to assess the perceived effectiveness of performance skills in a design laboratory environment. The mixed methodology used both quantitative and qualitative approaches to assess students' performance skills and congruency among the respondents, based on individual, team, and faculty perceptions of team effectiveness in three ABET areas: Communications Skills. Design Skills, and Teamwork. The findings of the research were used to address future use of the assessment tool and process. The results of the study found statistically significant differences in perceptions of Teamwork Skills (p < .05). When groups composed of students and professors were compared, professors were less likely to perceive student's teaming skills as effective. The study indicated the need to: (1) improve non-technical performance skills, such as teamwork, among freshman engineering students; (2) incorporate feedback into the learning process; (3) strengthen the assessment process with a follow-up plan that specifically targets performance skill deficiencies, and (4) integrate the assessment instrument and practice with ongoing curriculum development. The findings generated by this study provides engineering departments engaged in assessment activity, opportunity to reflect, refine, and develop their programs as it continues. It also extends research on ABET competencies of engineering students in an under-investigated topic of factors correlated with team processes, behavior, and student learning.

  17. Design of a professional development and support program for future photonics industry team leaders

    NASA Astrophysics Data System (ADS)

    Hall-Wallace, Michelle; Regens, Nancy L.; Pompea, Stephen M.

    2002-05-01

    The University of Arizona's Collaboration to Advance Teaching Technology and Science (CATTS) program sponsored by the National Science Foundation has found a successful way to unite public and charter school students and teachers, university science outreach programs, graduate and undergraduate students, and university faculty for the betterment of science education. A key aspect of this success has been the ability of the project to assist stakeholders in understanding the different cultural perspectives of all of the participants. The success of this program has led us to create a template for a professional development and support program emphasizing the degree of cross-cultural understanding appropriate for today's multinational photonics industry. This template is designed to give future photonics technical, managerial, and manufacturing leaders training in a variety of areas that can enhance their productivity and ability to lead teams. The design would be appropriate for photonics research and development teams, sales and marketing teams, teams with diverse members new college hires, and newly emplaced managers. This education template would also be appropriate for students in photonics industry technician and graduate- level programs. This type of program is not a substitute for other forms of professional managerial training, but rather augments such programs with material that can aid in a more global perspective.

  18. Enhancing Intercultural Competence of Engineering Students via GVT (Global Virtual Teams)-Based Virtual Exchanges: An International Collaborative Course in Intralogistics Education

    ERIC Educational Resources Information Center

    Wang, Rui; Rechl, Friederike; Bigontina, Sonja; Fang, Dianjun; Günthner, Willibald A.; Fottner, Johannes

    2017-01-01

    In order to enhance the intercultural competence of engineering students, an international collaborative course in intralogistics education was initiated and realized between the Technical University of Munich in Germany and the Tongji University in China. In this course, students worked in global virtual teams (GVTs) and solved a concrete case…

  19. The case for teaming on the ALS-STME program

    NASA Technical Reports Server (NTRS)

    Morea, S. F.

    1991-01-01

    The analysis concludes that the nation needs to proceed with a new LOX/LH2 rocket engine program now. It is also concluded that open competition now will have deleterious impacts on the competitive viability of the liquid rocket engine industry. Teaming, however, provides a way to solve todays concerns while enhancing the option for open competition in the future.

  20. 164. HISTORIC AMERICAN ENGINEERING RECORD SUMMER RECORDING TEAM, 1992. LEFT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    164. HISTORIC AMERICAN ENGINEERING RECORD SUMMER RECORDING TEAM, 1992. LEFT TO RIGHT: JOE ELLIOTT, PHOTOGRAPHER; VIRGINIA BRUMBACK, ARCHITECT; DAVE EVE, HISTORIAN (ICOMOS, IRONBRIDGE INSTITUTE, ENGLAND); BOB ARZYWACZ, PROJECT SUPERVISOR; LEE ANN JACKSON, ARCHITECT; AND ALBERT AFLENZER, ICOMOS ARCHITECT (TECHNICAL UNIVERSITY, VIENNA, AUSTRIA). - Bald Mountain Gold Mill, Nevada Gulch at head of False Bottom Creek, Lead, Lawrence County, SD

  1. Introduction to the Navigation Team: Johnson Space Center EG6 Internship

    NASA Technical Reports Server (NTRS)

    Gualdoni, Matthew

    2017-01-01

    The EG6 navigation team at NASA Johnson Space Center, like any team of engineers, interacts with the engineering process from beginning to end; from exploring solutions to a problem, to prototyping and studying the implementations, all the way to polishing and verifying a final flight-ready design. This summer, I was privileged enough to gain exposure to each of these processes, while also getting to truly experience working within a team of engineers. My summer can be broken up into three projects: i) Initial study and prototyping: investigating a manual navigation method that can be utilized onboard Orion in the event of catastrophic failure of navigation systems; ii) Finalizing and verifying code: altering a software routine to improve its robustness and reliability, as well as designing unit tests to verify its performance; and iii) Development of testing equipment: assisting in developing and integrating of a high-fidelity testbed to verify the performance of software and hardware.

  2. NASA's Robotic Mining Competition Provides Undergraduates Full Life Cycle Systems Engineering Experience

    NASA Technical Reports Server (NTRS)

    Stecklein, Jonette

    2017-01-01

    NASA has held an annual robotic mining competition for teams of university/college students since 2010. This competition is yearlong, suitable for a senior university engineering capstone project. It encompasses the full project life cycle from ideation of a robot design, through tele-operation of the robot collecting regolith in simulated Mars conditions, to disposal of the robot systems after the competition. A major required element for this competition is a Systems Engineering Paper in which each team describes the systems engineering approaches used on their project. The score for the Systems Engineering Paper contributes 25% towards the team’s score for the competition’s grand prize. The required use of systems engineering on the project by this competition introduces the students to an intense practical application of systems engineering throughout a full project life cycle.

  3. Evaluation of FCS self and peer-assessment approach based on Cooperative and Engineering Design learning.

    PubMed

    Cvetkovic, Dean

    2013-01-01

    The Cooperative Learning in Engineering Design curriculum can be enhanced with structured and timely self and peer assessment teaching methodologies which can easily be applied to any Biomedical Engineering curriculum. A study was designed and implemented to evaluate the effectiveness of this structured and timely self and peer assessment on student team-based projects. In comparing the 'peer-blind' and 'face-to-face' Fair Contribution Scoring (FCS) methods, both had advantages and disadvantages. The 'peer-blind' self and peer assessment method would cause high discrepancy between self and team ratings. But the 'face-to-face' method on the other hand did not have the discrepancy issue and had actually proved to be a more accurate and effective, indicating team cohesiveness and good cooperative learning.

  4. 7 CFR Appendix C to Subpart B of... - Technical Report for Hydropower Projects

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...,000 require the services of a licensed professional engineer (PE) or team of PEs. Depending on the... services of a licensed PE or a team of licensed PEs may be required for smaller projects. (a) Qualifications of project team. The hydropower project team should consist of a system designer, a project...

  5. 7 CFR Appendix C to Subpart B of... - Technical Report for Hydropower Projects

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...,000 require the services of a licensed professional engineer (PE) or team of PEs. Depending on the... services of a licensed PE or a team of licensed PEs may be required for smaller projects. (a) Qualifications of project team. The hydropower project team should consist of a system designer, a project...

  6. 7 CFR Appendix C to Subpart B of... - Technical Report for Hydropower Projects

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...,000 require the services of a licensed professional engineer (PE) or team of PEs. Depending on the... services of a licensed PE or a team of licensed PEs may be required for smaller projects. (a) Qualifications of project team. The hydropower project team should consist of a system designer, a project...

  7. A Systematic Review of Developing Team Competencies in Information Systems Education

    ERIC Educational Resources Information Center

    Figl, Kathrin

    2010-01-01

    The ability to work effectively in teams has been a key competence for information systems engineers for a long time. Gradually, more attention is being paid to developing this generic competence as part of academic curricula, resulting in two questions: how to best promote team competencies and how to implement team projects successfully. These…

  8. A self-referential HOWTO on release engineering

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Galassi, Mark C.

    Release engineering is a fundamental part of the software development cycle: it is the point at which quality control is exercised and bug fixes are integrated. The way in which software is released also gives the end user her first experience of a software package, while in scientific computing release engineering can guarantee reproducibility. For these reasons and others, the release process is a good indicator of the maturity and organization of a development team. Software teams often do not put in place a release process at the beginning. This is unfortunate because the team does not have early andmore » continuous execution of test suites, and it does not exercise the software in the same conditions as the end users. I describe an approach to release engineering based on the software tools developed and used by the GNU project, together with several specific proposals related to packaging and distribution. I do this in a step-by-step manner, demonstrating how this very paper is written and built using proper release engineering methods. Because many aspects of release engineering are not exercised in the building of the paper, the accompanying software repository also contains examples of software libraries.« less

  9. An Empirical Study of Hospitality Management Student Attitudes toward Group Projects: Instructional Factors and Team Problems

    ERIC Educational Resources Information Center

    Choi, Youngsoo; Ro, Heejung

    2012-01-01

    The development of positive attitudes in team-based work is important in management education. This study investigates hospitality students' attitudes toward group projects by examining instructional factors and team problems. Specifically, we examine how the students' perceptions of project appropriateness, instructors' support, and evaluation…

  10. Implementing the Team Approach in Higher Education: Important Questions and Advice for Administrators

    ERIC Educational Resources Information Center

    Lara, Tracy M.; Hughey, Aaron W.

    2008-01-01

    Many companies have implemented the team approach as a way to empower their employees in an effort to enhance productivity, quality and overall profitability. While application of the concept to higher education administration has been limited, colleges and universities could benefit from the team approach if implemented appropriately and…

  11. The Role of Coaching in Student Teams: A "Just-in-Time" Approach to Learning.

    ERIC Educational Resources Information Center

    Bolton, Michele Kremen

    1999-01-01

    Describes ways teachers can support student teams: (1) starting on the right foot by laying the groundwork of group process; (2) increasing effectiveness by helping teams manage diversity and conflict; and (3) helping students learn from the teamwork experience. Appropriate coaching behaviors for each step are presented. (SK)

  12. Concurrent Engineering Working Group White Paper Distributed Collaborative Design: The Next Step in Aerospace Concurrent Engineering

    NASA Technical Reports Server (NTRS)

    Hihn, Jairus; Chattopadhyay, Debarati; Karpati, Gabriel; McGuire, Melissa; Panek, John; Warfield, Keith; Borden, Chester

    2011-01-01

    As aerospace missions grow larger and more technically complex in the face of ever tighter budgets, it will become increasingly important to use concurrent engineering methods in the development of early conceptual designs because of their ability to facilitate rapid assessments and trades of performance, cost and schedule. To successfully accomplish these complex missions with limited funding, it is essential to effectively leverage the strengths of individuals and teams across government, industry, academia, and international agencies by increased cooperation between organizations. As a result, the existing concurrent engineering teams will need to increasingly engage in distributed collaborative concurrent design. The purpose of this white paper is to identify a near-term vision for the future of distributed collaborative concurrent engineering design for aerospace missions as well as discuss the challenges to achieving that vision. The white paper also documents the advantages of creating a working group to investigate how to engage the expertise of different teams in joint design sessions while enabling organizations to maintain their organizations competitive advantage.

  13. 2014-2685

    NASA Image and Video Library

    2014-05-23

    CAPE CANAVERAL, Fla. -- Kennedy Space Center engineer Marc Seibert presents the Communication Award to the University of New Hampshire team members during NASA's 2014 Robotic Mining Competition award ceremony inside the Space Shuttle Atlantis attraction at the Kennedy Space Center Visitor Complex in Florida. The team moved 10 kilograms of simulated Martian soil with its robot while using the least amount of communication power. More than 35 teams from colleges and universities around the U.S. designed and built remote-controlled robots for the mining competition. The competition is a NASA Human Exploration and Operations Mission Directorate project designed to engage and retain students in science, technology, engineering and mathematics, or STEM, fields by expanding opportunities for student research and design. Teams use their remote-controlled robotics to maneuver and dig in a supersized sandbox filled with a crushed material that has characteristics similar to Martian soil. The objective of the challenge is to see which team’s robot can collect and move the most regolith within a specified amount of time. The competition includes on-site mining, writing a systems engineering paper, performing outreach projects for K-12 students, slide presentation and demonstrations, and team spirit. For more information, visit www.nasa.gov/nasarmc. Photo credit: NASA/Kim Shiflett

  14. Determining level of care appropriateness in the patient journey from acute care to rehabilitation

    PubMed Central

    2011-01-01

    Background The selection of patients for rehabilitation, and the timing of transfer from acute care, are important clinical decisions that impact on care quality and patient flow. This paper reports utilization review data on inpatients in acute care with stroke, hip fracture or elective joint replacement, and other inpatients referred for rehabilitation. It examines reasons why acute level of care criteria are not met and explores differences in decision making between acute care and rehabilitation teams around patient appropriateness and readiness for transfer. Methods Cohort study of patients in a large acute referral hospital in Australia followed with the InterQual utilization review tool, modified to also include reasons why utilization criteria are not met. Additional data on team decision making about appropriateness for rehabilitation, and readiness for transfer, were collected on a subset of patients. Results There were 696 episodes of care (7189 bed days). Days meeting acute level of care criteria were 56% (stroke, hip fracture and joint replacement patients) and 33% (other patients, from the time of referral). Most inappropriate days in acute care were due to delays in processes/scheduling (45%) or being more appropriate for rehabilitation or lower level of care (30%). On the subset of patients, the acute care team and the utilization review tool deemed patients ready for rehabilitation transfer earlier than the rehabilitation team (means of 1.4, 1.3 and 4.0 days from the date of referral, respectively). From when deemed medically stable for transfer by the acute care team, 28% of patients became unstable. From when deemed stable by the rehabilitation team or utilization review, 9% and 11%, respectively, became unstable. Conclusions A high proportion of patient days did not meet acute level of care criteria, due predominantly to inefficiencies in care processes, or to patients being more appropriate for an alternative level of care, including rehabilitation. The rehabilitation team was the most accurate in determining ongoing medical stability, but at the cost of a longer acute stay. To avoid inpatients remaining in acute care in a state of 'terra nullius', clinical models which provide rehabilitation within acute care, and more efficient movement to a rehabilitation setting, is required. Utilization review could have a decision support role in the determination of medical stability. PMID:22040281

  15. STS-114 Engine Cut-off Sensor Anomaly Technical Consultation Report

    NASA Technical Reports Server (NTRS)

    Wilson, Timmy R.; Kichak, Robert A.; Ungar, Eugene K.; Cherney, Robert; Rickman, Steve L.

    2009-01-01

    The NESC consultation team participated in real-time troubleshooting of the Main Propulsion System (MPS) Engine Cutoff (ECO) sensor system failures during STS-114 launch countdown. The team assisted with External Tank (ET) thermal and ECO Point Sensor Box (PSB) circuit analyses, and made real-time inputs to the Space Shuttle Program (SSP) problem resolution teams. Several long-term recommendations resulted. One recommendation was to conduct cryogenic tests of the ECO sensors to validate, or disprove, the theory that variations in circuit impedance due to cryogenic effects on swaged connections within the sensor were the root cause of STS-114 failures.

  16. International Space Station Configuration Analysis and Integration

    NASA Technical Reports Server (NTRS)

    Anchondo, Rebekah

    2016-01-01

    Ambitious engineering projects, such as NASA's International Space Station (ISS), require dependable modeling, analysis, visualization, and robotics to ensure that complex mission strategies are carried out cost effectively, sustainably, and safely. Learn how Booz Allen Hamilton's Modeling, Analysis, Visualization, and Robotics Integration Center (MAVRIC) team performs engineering analysis of the ISS Configuration based primarily on the use of 3D CAD models. To support mission planning and execution, the team tracks the configuration of ISS and maintains configuration requirements to ensure operational goals are met. The MAVRIC team performs multi-disciplinary integration and trade studies to ensure future configurations meet stakeholder needs.

  17. Next-generation concurrent engineering: developing models to complement point designs

    NASA Technical Reports Server (NTRS)

    Morse, Elizabeth; Leavens, Tracy; Cohanim, Babak; Harmon, Corey; Mahr, Eric; Lewis, Brian

    2006-01-01

    Concurrent Engineering Design (CED) teams have made routine the rapid development of point designs for space missions. The Jet Propulsion Laboratory's Team X is now evolving into a 'next-generation CED; in addition to a point design, the Team develops a model of the local trade space. The process is a balance between the power of a model developing tools and the creativity of humal experts, enabling the development of a variety of trade models for any space mission. This paper reviews the modeling method and its practical implementation in the ED environment. Example results illustrate the benefit of this approach.

  18. UAF Space Systems Engineering Program: Engaging Students through an Apprenticeship Model

    NASA Astrophysics Data System (ADS)

    Thorsen, D.

    2017-12-01

    Learning by doing has been the mantra of engineering education for decades, however, the constraints of semester length courses limits the types and size of experiences that can be offered to students. The Space Systems Engineering Program (SSEP) at the University of Alaska Fairbanks provides interdisciplinary engineering and science students with hands-on experience in all aspects of space systems engineering through a design, build, launch paradigm applied to balloon and rocket payloads and small satellites. The program is structured using an apprenticeship model such that students, freshmen through graduate, can participate in multi-year projects thereby gaining experiences appropriate to their level in college. Students enter the lab in a trainee position and receive training on lab processes and design software. Depending on the student's interests they learn how to use specific lab equipment and software design tools. Trainees provide support engineering under guidance of an upper classman. As the students' progress in their degree program and gain more expertise, they typically become part of a specific subsystem team, where they receive additional training in developing design documents and in writing requirements and test documents, and direct their efforts to meeting specific objectives. By the time the student reaches their senior year, they have acquired the leadership role for a specific subsystem and/or a general leadership role in the lab. If students stay to pursue graduate degrees, they assume the responsibility of training and mentoring other undergraduates in their areas of expertise. Throughout the program upper class students mentor the newer students. The Space Systems Engineering Program strives to reinforce a student's degree program through these large scale projects that place engineering in context.

  19. KSC-03pd0269

    NASA Image and Video Library

    2003-02-05

    KENNEDY SPACE CENTER, FLA. -- Members of the Recovery Management Team at KSC are at work in the Operations Support Building. They are part of the investigation into the accident that claimed orbiter Columbia and her crew of seven on Feb. 1, 2003, over East Texas as they returned to Earth after a 16-day research mission. From left around the table are Don Maxwell, Safety, United Space Alliance (USA); Russ DeLoach, chief, Shuttle Mission Assurance Branch, NASA; George Jacobs, Shuttle Engineering; Jeff Campbell, Shuttle Engineering; Dave Rainer, Launch and Landing Operations; and the two co-chairs of the Response Management Team, Denny Gagen, Landing Recovery Manager, and Chris Hasselbring, Landing Operations, USA. The team is coordinating KSC technical support and assets to the Mishap Investigation Team in Barksdale, La., and providing support for the Recovery teams in Los Angeles, Texas, New Mexico, Arizona and California. In addition, the team is following up on local leads pertaining to potential debris in the KSC area. .

  20. Forum on Workforce Development

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward

    2010-01-01

    APPEL Mission: To support NASA's mission by promoting individual, team, and organizational excellence in program/project management and engineering through the application of learning strategies, methods, models, and tools. Goals: a) Provide a common frame of reference for NASA s technical workforce. b) Provide and enhance critical job skills. c) Support engineering, program and project teams. d) Promote organizational learning across the agency. e) Supplement formal educational programs.

  1. Center for Advanced Bioengineering for Soldier Survivability

    DTIC Science & Technology

    2013-06-01

    useful products have been limited. This is in part because the technology development teams have failed to include clinicians and engineers...to useful products have been limited. This is in part because the technology development teams have failed to include clinicians and engineers...7, 14, 21, and 28 days. After 28 days the samples were explanted, fixed, and scanned for mineralized matrix using Micro -CT imaging. Some samples

  2. Hydrogen Vent Ground Umbilical Quick Disconnect - Flight Seal Advanced Development

    NASA Technical Reports Server (NTRS)

    Girard, Doug; Jankowski, Fred; Minich, Mark C.; Yu, Weiping

    2012-01-01

    This project is a team effort between NASA Engineering (NE) and Team QNA Engineering personnel to provide support for the Umbilical Systems Development project which is funded by Advanced Exploration Systems (AES) and 21st Century Launch Complex. Specifically, this project seeks to develop a new interface between the PPBE baselined Legacy SSP LH2 Vent Arm QD probe and SLS vent seal.

  3. Improving Team Performance: Proceedings of the Rand Team Performance Workshop.

    DTIC Science & Technology

    1980-08-01

    organization theory, small group processes, cognitive psychologi training and instruction , decision theory, artificial intelligence, and human engineering...theory, small group processes, cognitive psy- chology, training and instruction , heuristic modeling, decision theory, and human engineering. Within...interact with. The operators are taught about the equipment and how it works; the actual job is left to be learned aboard ship. The cognitive processes the

  4. NASA's Planetary Science Summer School: Training Future Mission Leaders in a Concurrent Engineering Environment

    NASA Astrophysics Data System (ADS)

    Mitchell, K. L.; Lowes, L. L.; Budney, C. J.; Sohus, A.

    2014-12-01

    NASA's Planetary Science Summer School (PSSS) is an intensive program for postdocs and advanced graduate students in science and engineering fields with a keen interest in planetary exploration. The goal is to train the next generation of planetary science mission leaders in a hands-on environment involving a wide range of engineers and scientists. It was established in 1989, and has undergone several incarnations. Initially a series of seminars, it became a more formal mission design experience in 1999. Admission is competitive, with participants given financial support. The competitively selected trainees develop an early mission concept study in teams of 15-17, responsive to a typical NASA Science Mission Directorate Announcement of Opportunity. They select the mission concept from options presented by the course sponsors, based on high-priority missions as defined by the Decadal Survey, prepare a presentation for a proposal authorization review, present it to a senior review board and receive critical feedback. Each participant assumes multiple roles, on science, instrument and project teams. They develop an understanding of top-level science requirements and instrument priorities in advance through a series of reading assignments and webinars help trainees. Then, during the five day session at Jet Propulsion Laboratory, they work closely with concurrent engineers including JPL's Advanced Projects Design Team ("Team X"), a cross-functional multidisciplinary team of engineers that utilizes concurrent engineering methodologies to complete rapid design, analysis and evaluation of mission concept designs. All are mentored and assisted directly by Team X members and course tutors in their assigned project roles. There is a strong emphasis on making difficult trades, simulating a real mission design process as accurately as possible. The process is intense and at times dramatic, with fast-paced design sessions and late evening study sessions. A survey of PSSS alumni administered in 2013 provides information on the program's impact on trainees' career choices and leadership roles as they pursue their employment in planetary science and related fields. Results will be presented during the session, along with highlights of topics and missions covered since the program's inception.

  5. Using A Model-Based Systems Engineering Approach For Exploration Medical System Development

    NASA Technical Reports Server (NTRS)

    Hanson, A.; Mindock, J.; McGuire, K.; Reilly, J.; Cerro, J.; Othon, W.; Rubin, D.; Urbina, M.; Canga, M.

    2017-01-01

    NASA's Human Research Program's Exploration Medical Capabilities (ExMC) element is defining the medical system needs for exploration class missions. ExMC's Systems Engineering (SE) team will play a critical role in successful design and implementation of the medical system into exploration vehicles. The team's mission is to "Define, develop, validate, and manage the technical system design needed to implement exploration medical capabilities for Mars and test the design in a progression of proving grounds." Development of the medical system is being conducted in parallel with exploration mission architecture and vehicle design development. Successful implementation of the medical system in this environment will require a robust systems engineering approach to enable technical communication across communities to create a common mental model of the emergent engineering and medical systems. Model-Based Systems Engineering (MBSE) improves shared understanding of system needs and constraints between stakeholders and offers a common language for analysis. The ExMC SE team is using MBSE techniques to define operational needs, decompose requirements and architecture, and identify medical capabilities needed to support human exploration. Systems Modeling Language (SysML) is the specific language the SE team is utilizing, within an MBSE approach, to model the medical system functional needs, requirements, and architecture. Modeling methods are being developed through the practice of MBSE within the team, and tools are being selected to support meta-data exchange as integration points to other system models are identified. Use of MBSE is supporting the development of relationships across disciplines and NASA Centers to build trust and enable teamwork, enhance visibility of team goals, foster a culture of unbiased learning and serving, and be responsive to customer needs. The MBSE approach to medical system design offers a paradigm shift toward greater integration between vehicle and the medical system and directly supports the transition of Earth-reliant ISS operations to the Earth-independent operations envisioned for Mars. Here, we describe the methods and approach to building this integrated model.

  6. Human Systems Integration Competency Development for Navy Systems Commands

    DTIC Science & Technology

    2012-09-01

    cognizance of Applied Engineering /Psychology relative to knowledge engineering, training, teamwork, user interface design and decision sciences. KSA...cognizance of Applied Engineering /Psychology relative to knowledge engineering, training, teamwork, user interface design and decision sciences...requirements (as required). Fundamental cognizance of Applied Engineering / Psychology relative to knowledge engineering, training, team work, user

  7. The NASA Technical Report Server

    NASA Technical Reports Server (NTRS)

    Nelson, Michael L.; Gottlich, Gretchen L.; Bianco, David J.; Paulson, Sharon S.; Binkley, Robert L.; Kellogg, Yvonne D.; Beaumont, Chris J.; Schmunk, Robert B.; Kurtz, Michael J.; Accomazzi, Alberto

    1995-01-01

    The National Aeronautics and Space Act of 1958 established NASA and charged it to "provide for the widest practicable and appropriate dissemination of information concerning its activities and the results thereof." The search for innovative methods to distribute NASA's information lead a grass-roots team to create the NASA Technical Report Server (NTRS), which uses the World Wide Web and other popular Internet-based information systems as search engines. The NTRS is an inter-center effort which provides uniform access to various distributed publication servers residing on the Internet. Users have immediate desktop access to technical publications from NASA centers and institutes. The NTRS is comprised of several units, some constructed especially for inclusion in NTRS, and others that are existing NASA publication services that NTRS reuses. This paper presents the NTRS architecture, usage metrics, and the lessons learned while implementing and maintaining the service. The NTRS is largely constructed with freely available software running on existing hardware. NTRS builds upon existing hardware and software, and the resulting additional exposure for the body of literature contained ensures that NASA's institutional knowledge base will continue to receive the widest practicable and appropriate dissemination.

  8. Overview of X-38 Hypersonic Aerothermodynamic Wind Tunnel Data and Comparison with Numerical Results

    NASA Technical Reports Server (NTRS)

    Campbell, C.; Caram, J.; Berry, S.; Horvath, T.; Merski, N.; Loomis, M.; Venkatapathy, E.

    2004-01-01

    A NASA team of engineers has been organized to design a crew return vehicle for returning International Space Station crew members from orbit. The hypersonic aerothermodynamic characteristics of the X-23/X-24A derived X-38 crew return vehicle are being evaluated in various wind tunnels in support of this effort. Aerothermodynamic data from two NASA hypersonic tunnels at Mach 6 and Mach 10 has been obtained with cast ceramic models and a thermographic phosphorus digital imaging system. General windward surface heating features are described based on experimental surface heating images and surface oil flow patterns for the nominal hypersonic aerodynamic orientation. Body flap reattachment heating levels are examined. Computational Fluid Dynamics tools have been applied at the appropriate wind tunnel conditions to make comparisons with this data.

  9. Overview of X-38 Hypersonic Wind Tunnel Data and Comparison with Numerical Results

    NASA Technical Reports Server (NTRS)

    Campbell, Charles H.; Caram, Jose; Berry, Scott; DiFulvio, Michael; Horvath, Tom

    1997-01-01

    A NASA team of engineers has been organized to design a crew return vehicle for returning International Space Station crew members from orbit. The hypersonic characteristics of this X-23/X-2&4 derived crew return vehicle (designated X-38) are being evaluated in various wind tunnels in support of this effort. Aerodynamic data has been acquired in three NASA hypersonic facilities at Mach 20, and Mach 6. Computational Fluid Dynamics tools have been applied at the appropriate wind tunnel conditions to make comparisons with portions of this data. Experimental data from the Mach 6 Air and CF4 facilities illustrate a net positive pitching moment increment due to density ratio, as well as increased elevon effectiveness. Chemical nonequilibrium computational fluid dynamics solutions at flight conditions reinforce this conclusion.

  10. Space Transportation System Liftoff Debris Mitigation Process Overview

    NASA Technical Reports Server (NTRS)

    Mitchell, Michael; Riley, Christopher

    2011-01-01

    Liftoff debris is a top risk to the Space Shuttle Vehicle. To manage the Liftoff debris risk, the Space Shuttle Program created a team with in the Propulsion Systems Engineering & Integration Office. The Shutt le Liftoff Debris Team harnesses the Systems Engineering process to i dentify, assess, mitigate, and communicate the Liftoff debris risk. T he Liftoff Debris Team leverages off the technical knowledge and expe rtise of engineering groups across multiple NASA centers to integrate total system solutions. These solutions connect the hardware and ana lyses to identify and characterize debris sources and zones contribut ing to the Liftoff debris risk. The solutions incorporate analyses sp anning: the definition and modeling of natural and induced environmen ts; material characterizations; statistical trending analyses, imager y based trajectory analyses; debris transport analyses, and risk asse ssments. The verification and validation of these analyses are bound by conservative assumptions and anchored by testing and flight data. The Liftoff debris risk mitigation is managed through vigilant collab orative work between the Liftoff Debris Team and Launch Pad Operation s personnel and through the management of requirements, interfaces, r isk documentation, configurations, and technical data. Furthermore, o n day of launch, decision analysis is used to apply the wealth of ana lyses to case specific identified risks. This presentation describes how the Liftoff Debris Team applies Systems Engineering in their proce sses to mitigate risk and improve the safety of the Space Shuttle Veh icle.

  11. Peer Evaluation in Blended Team Project-Based Learning: What Do Students Find Important?

    ERIC Educational Resources Information Center

    Lee, Hye-Jung; Lim, Cheolil

    2012-01-01

    Team project-based learning is reputed to be an appropriate way to activate interactions among students and to encourage knowledge building through collaborative learning. Peer evaluation is an effective way for each student to participate actively in a team project. This article investigates the issues that are important to students when…

  12. Distributed Observer Network

    NASA Technical Reports Server (NTRS)

    Conroy, Michael; Mazzone, Rebecca; Little, William; Elfrey, Priscilla; Mann, David; Mabie, Kevin; Cuddy, Thomas; Loundermon, Mario; Spiker, Stephen; McArthur, Frank; hide

    2010-01-01

    The Distributed Observer network (DON) is a NASA-collaborative environment that leverages game technology to bring three-dimensional simulations to conventional desktop and laptop computers in order to allow teams of engineers working on design and operations, either individually or in groups, to view and collaborate on 3D representations of data generated by authoritative tools such as Delmia Envision, Pro/Engineer, or Maya. The DON takes models and telemetry from these sources and, using commercial game engine technology, displays the simulation results in a 3D visual environment. DON has been designed to enhance accessibility and user ability to observe and analyze visual simulations in real time. A variety of NASA mission segment simulations [Synergistic Engineering Environment (SEE) data, NASA Enterprise Visualization Analysis (NEVA) ground processing simulations, the DSS simulation for lunar operations, and the Johnson Space Center (JSC) TRICK tool for guidance, navigation, and control analysis] were experimented with. Desired functionalities, [i.e. Tivo-like functions, the capability to communicate textually or via Voice-over-Internet Protocol (VoIP) among team members, and the ability to write and save notes to be accessed later] were targeted. The resulting DON application was slated for early 2008 release to support simulation use for the Constellation Program and its teams. Those using the DON connect through a client that runs on their PC or Mac. This enables them to observe and analyze the simulation data as their schedule allows, and to review it as frequently as desired. DON team members can move freely within the virtual world. Preset camera points can be established, enabling team members to jump to specific views. This improves opportunities for shared analysis of options, design reviews, tests, operations, training, and evaluations, and improves prospects for verification of requirements, issues, and approaches among dispersed teams.

  13. An automated environment for multiple spacecraft engineering subsystem mission operations

    NASA Technical Reports Server (NTRS)

    Bahrami, K. A.; Hioe, K.; Lai, J.; Imlay, E.; Schwuttke, U.; Hsu, E.; Mikes, S.

    1990-01-01

    Flight operations at the Jet Propulsion Laboratory (JPL) are now performed by teams of specialists, each team dedicated to a particular spacecraft. Certain members of each team are responsible for monitoring the performances of their respective spacecraft subsystems. Ground operations, which are very complex, are manual, labor-intensive, slow, and tedious, and therefore costly and inefficient. The challenge of the new decade is to operate a large number of spacecraft simultaneously while sharing limited human and computer resources, without compromising overall reliability. The Engineering Analysis Subsystem Environment (EASE) is an architecture that enables fewer controllers to monitor and control spacecraft engineering subsystems. A prototype of EASE has been installed in the JPL Space Flight Operations Facility for on-line testing. This article describes the underlying concept, development, testing, and benefits of the EASE prototype.

  14. An Open Source Tool to Test Interoperability

    NASA Astrophysics Data System (ADS)

    Bermudez, L. E.

    2012-12-01

    Scientists interact with information at various levels from gathering of the raw observed data to accessing portrayed processed quality control data. Geoinformatics tools help scientist on the acquisition, storage, processing, dissemination and presentation of geospatial information. Most of the interactions occur in a distributed environment between software components that take the role of either client or server. The communication between components includes protocols, encodings of messages and managing of errors. Testing of these communication components is important to guarantee proper implementation of standards. The communication between clients and servers can be adhoc or follow standards. By following standards interoperability between components increase while reducing the time of developing new software. The Open Geospatial Consortium (OGC), not only coordinates the development of standards but also, within the Compliance Testing Program (CITE), provides a testing infrastructure to test clients and servers. The OGC Web-based Test Engine Facility, based on TEAM Engine, allows developers to test Web services and clients for correct implementation of OGC standards. TEAM Engine is a JAVA open source facility, available at Sourceforge that can be run via command line, deployed in a web servlet container or integrated in developer's environment via MAVEN. The TEAM Engine uses the Compliance Test Language (CTL) and TestNG to test HTTP requests, SOAP services and XML instances against Schemas and Schematron based assertions of any type of web service, not only OGC services. For example, the OGC Web Feature Service (WFS) 1.0.0 test has more than 400 test assertions. Some of these assertions includes conformance of HTTP responses, conformance of GML-encoded data; proper values for elements and attributes in the XML; and, correct error responses. This presentation will provide an overview of TEAM Engine, introduction of how to test via the OGC Testing web site and description of performing local tests. It will also provide information about how to participate in the open source code development of TEAM Engine.

  15. Aerospace Systems Design in NASA's Collaborative Engineering Environment

    NASA Technical Reports Server (NTRS)

    Monell, Donald W.; Piland, William M.

    2000-01-01

    Past designs of complex aerospace systems involved an environment consisting of collocated design teams with project managers, technical discipline experts, and other experts (e.g., manufacturing and systems operation). These experts were generally qualified only on the basis of past design experience and typically had access to a limited set of integrated analysis tools. These environments provided less than desirable design fidelity, often lead to the inability of assessing critical programmatic and technical issues (e.g., cost, risk, technical impacts), and generally derived a design that was not necessarily optimized across the entire system. The continually changing, modern aerospace industry demands systems design processes that involve the best talent available (no matter where it resides) and access to the the best design and analysis tools. A solution to these demands involves a design environment referred to as collaborative engineering. The collaborative engineering environment evolving within the National Aeronautics and Space Administration (NASA) is a capability that enables the Agency's engineering infrastructure to interact and use the best state-of-the-art tools and data across organizational boundaries. Using collaborative engineering, the collocated team is replaced with an interactive team structure where the team members are geographical distributed and the best engineering talent can be applied to the design effort regardless of physical location. In addition, a more efficient, higher quality design product is delivered by bringing together the best engineering talent with more up-to-date design and analysis tools. These tools are focused on interactive, multidisciplinary design and analysis with emphasis on the complete life cycle of the system, and they include nontraditional, integrated tools for life cycle cost estimation and risk assessment. NASA has made substantial progress during the last two years in developing a collaborative engineering environment. NASA is planning to use this collaborative engineering engineering infrastructure to provide better aerospace systems life cycle design and analysis, which includes analytical assessment of the technical and programmatic aspects of a system from "cradle to grave." This paper describes the recent NASA developments in the area of collaborative engineering, the benefits (realized and anticipated) of using the developed capability, and the long-term plans for implementing this capability across Agency.

  16. Engineering for Native Americans.

    ERIC Educational Resources Information Center

    Jarosz, Jeffrey

    2003-01-01

    The engineering workforce is overwhelmingly male and White. To attract and retain American Indian and other minority-group students, engineering programs must offer practical, hands-on, team activities; show that engineering is beneficial to society and Indian communities; use inclusive textbooks; offer distance-learning opportunities; and…

  17. A Multidisciplinary Engineering Summer School in an Industrial Setting

    ERIC Educational Resources Information Center

    Larsen, Peter Gorm; Fernandes, Joao M.; Habel, Jacek; Lehrskov, Hanne; Vos, Richard J. C.; Wallington, Oliver; Zidek, Jan

    2009-01-01

    Most university-level engineering studies produce technically skilled engineers. However, typically students face several difficulties when working in multidisciplinary teams when they initiate their industrial careers. In a globalised world, it becomes increasingly important that engineers are capable of collaborating across disciplinary…

  18. White House Science Fair

    NASA Image and Video Library

    2014-05-27

    NASA Administrator Charles Bolden poses with an all-girl engineering team that participated in the White House Science Fair. "Team Rocket Power" was one of 100 teams that qualified for last year’s Team America Rocketry Challenge (TARC). Nia'mani Robinson, 15, Jasmyn Logan, 15, and Rebecca Chapin-Ridgely, 17, gave up their weekends and free time after school to build and test their bright purple rocket, which is designed to launch to an altitude of about 750 ft, and then return a “payload” (an egg) to the ground safely. The fourth White House Science Fair was held at the White House on May 27, 2014 and included 100 students from more than 30 different states who competed in science, technology, engineering, and math (STEM) competitions. (Photo Credit: NASA/Aubrey Gemignani)

  19. Early Career Summer Interdisciplinary Team Experiences and Student Persistence in STEM Fields

    NASA Astrophysics Data System (ADS)

    Cadavid, A. C.; Pedone, V. A.; Horn, W.; Rich, H.

    2015-12-01

    STEPS (Students Targeting Engineering and Physical Science) is an NSF-funded program designed to increase the number of California State University Northridge students getting bachelor's degrees in the natural sciences, mathematics, engineering and computer science. The greatest loss of STEM majors occurs between sophomore and junior- years, so we designed Summer Interdisciplinary Team Experience (SITE) as an early career program for these students. Students work closely with a faculty mentor in teams of ten to investigate regionally relevant problems, many of which relate to sustainability efforts on campus or the community. The projects emphasize hands-on activities and team-based learning and decision making. We report data for five years of projects, qualitative assessment through entrance and exit surveys and student interviews, and in initial impact on retention of the participants.

  20. Management team learning orientation and business unit performance.

    PubMed

    Bunderson, J Stuart; Sutcliffe, Kathleen M

    2003-06-01

    Although research has suggested that teams can differ in the extent to which they encourage proactive learning and competence development among their members (a team learning orientation), the performance consequences of these differences are not well understood. Drawing from research on goal orientation and team learning, this article suggests that, although a team learning orientation can encourage adaptive behaviors that lead to improved performance, it is also possible for teams to compromise performance in the near term by overemphasizing learning, particularly when they have been performing well. A test of this proposition in a sample of business unit management teams provides strong support. The results confirm that an appropriate emphasis on learning can have positive consequences for team effectiveness.

  1. The Effects of Integrating On-Going Training for Technical Documentation Teams

    ERIC Educational Resources Information Center

    Catanio, Joseph T.; Catanio, Teri L.

    2010-01-01

    The tools and techniques utilized in the technical communications profession are constantly improving and changing. Information Technology (IT) organizations devote the necessary resources to equip and train engineering, marketing, and sales teams, but often fail to do so for technical documentation teams. Many IT organizations tend to view…

  2. The codesign of an interdisciplinary team-based intervention regarding initiating palliative care in pediatric oncology.

    PubMed

    Hill, Douglas L; Walter, Jennifer K; Casas, Jessica A; DiDomenico, Concetta; Szymczak, Julia E; Feudtner, Chris

    2018-04-07

    Children with advanced cancer are often not referred to palliative or hospice care before they die or are only referred close to the child's death. The goals of the current project were to learn about pediatric oncology team members' perspectives on palliative care, to collaborate with team members to modify and tailor three separate interdisciplinary team-based interventions regarding initiating palliative care, and to assess the feasibility of this collaborative approach. We used a modified version of experience-based codesign (EBCD) involving members of the pediatric palliative care team and three interdisciplinary pediatric oncology teams (Bone Marrow Transplant, Neuro-Oncology, and Solid Tumor) to review and tailor materials for three team-based interventions. Eleven pediatric oncology team members participated in four codesign sessions to discuss their experiences with initiating palliative care and to review the proposed intervention including patient case studies, techniques for managing uncertainty and negative emotions, role ambiguity, system-level barriers, and team communication and collaboration. The codesign process showed that the participants were strong supporters of palliative care, members of different teams had preferences for different materials that would be appropriate for their teams, and that while participants reported frustration with timing of palliative care, they had difficulty suggesting how to change current practices. The current project demonstrated the feasibility of collaborating with pediatric oncology clinicians to develop interventions about introducing palliative care. The procedures and results of this project will be posted online so that other institutions can use them as a model for developing similar interventions appropriate for their needs.

  3. The InSight Team at Lockheed Martin

    NASA Image and Video Library

    2018-01-25

    The InSight Team at Lockheed Martin Space in May 2017 The InSight team is comprised of scientists and engineers from multiple disciplines and is a unique collaboration between countries and organizations around the world. The science team includes co-investigators from the U.S., France, Germany, Austria, Belgium, Canada, Japan, Switzerland and the United Kingdom. https://photojournal.jpl.nasa.gov/catalog/PIA22235

  4. The InSight Team at JPL

    NASA Image and Video Library

    2018-01-25

    The InSight Team at NASA's Jet Propulsion Laboratory, JPL, in June 2015. The InSight team is comprised of scientists and engineers from multiple disciplines and is a unique collaboration between countries and organizations around the world. The science team includes co-investigators from the U.S., France, Germany, Austria, Belgium, Canada, Japan, Switzerland and the United Kingdom. https://photojournal.jpl.nasa.gov/catalog/PIA22234

  5. CASIS Fact Sheet: Hardware and Facilities

    NASA Technical Reports Server (NTRS)

    Solomon, Michael R.; Romero, Vergel

    2016-01-01

    Vencore is a proven information solutions, engineering, and analytics company that helps our customers solve their most complex challenges. For more than 40 years, we have designed, developed and delivered mission-critical solutions as our customers' trusted partner. The Engineering Services Contract, or ESC, provides engineering and design services to the NASA organizations engaged in development of new technologies at the Kennedy Space Center. Vencore is the ESC prime contractor, with teammates that include Stinger Ghaffarian Technologies, Sierra Lobo, Nelson Engineering, EASi, and Craig Technologies. The Vencore team designs and develops systems and equipment to be used for the processing of space launch vehicles, spacecraft, and payloads. We perform flight systems engineering for spaceflight hardware and software; develop technologies that serve NASA's mission requirements and operations needs for the future. Our Flight Payload Support (FPS) team at Kennedy Space Center (KSC) provides engineering, development, and certification services as well as payload integration and management services to NASA and commercial customers. Our main objective is to assist principal investigators (PIs) integrate their science experiments into payload hardware for research aboard the International Space Station (ISS), commercial spacecraft, suborbital vehicles, parabolic flight aircrafts, and ground-based studies. Vencore's FPS team is AS9100 certified and a recognized implementation partner for the Center for Advancement of Science in Space (CASIS

  6. Problem Solving and Engineering Design, Introducing Bachelor Students to Engineering Practice at K. U. Leuven

    ERIC Educational Resources Information Center

    Heylen, Christel; Smet, Marc; Buelens, Hermans; Sloten, Jos Vander

    2007-01-01

    A present-day engineer has a large scientific knowledge; he is a team-player, eloquent communicator and life-long learner. At the Katholieke Universiteit Leuven, the course "Problem Solving and Engineering Design" introduces engineering students from the first semester onwards into real engineering practice and teamwork. Working in small…

  7. Summary Statement: Appropriate Medical Care for the Secondary School-Aged Athlete

    PubMed Central

    Almquist, Jon; Valovich McLeod, Tamara C; Cavanna, Angela; Jenkinson, Dave; Lincoln, Andrew E; Loud, Keith; Peterson, Bart C; Portwood, Craig; Reynolds, John; Woods, Thomas S

    2008-01-01

    Objective: To present the recommendations made by the Appropriate Medical Care for Secondary School-Aged Athletes Task Force and to summarize the subsequent monograph developed around 11 consensus points. Data Sources: The MEDLINE, CINAHL, and SportDiscus databases were searched for relevant literature regarding secondary school-aged athletes; health care administration; preparticipation physical examination; facilities; athletic equipment; emergency action planning; environmental conditions; recognition, evaluation, and treatment of injuries; rehabilitation and reconditioning; psychosocial consultation; nutrition; and prevention strategies. Conclusions and Recommendations: Organizations that sponsor athletic programs for secondary school-aged athletes should establish an athletic health care team to ensure that appropriate medical care is provided to all participants. The 11 consensus points provide a framework—one that is supported by the medical literature and case law—for the development of an athletic health care team and for assigning responsibilities to the team, administrators, and staff members of institutions sponsoring secondary school and club-level athletic programs. PMID:18668175

  8. Applying Model Based Systems Engineering to NASA's Space Communications Networks

    NASA Technical Reports Server (NTRS)

    Bhasin, Kul; Barnes, Patrick; Reinert, Jessica; Golden, Bert

    2013-01-01

    System engineering practices for complex systems and networks now require that requirement, architecture, and concept of operations product development teams, simultaneously harmonize their activities to provide timely, useful and cost-effective products. When dealing with complex systems of systems, traditional systems engineering methodology quickly falls short of achieving project objectives. This approach is encumbered by the use of a number of disparate hardware and software tools, spreadsheets and documents to grasp the concept of the network design and operation. In case of NASA's space communication networks, since the networks are geographically distributed, and so are its subject matter experts, the team is challenged to create a common language and tools to produce its products. Using Model Based Systems Engineering methods and tools allows for a unified representation of the system in a model that enables a highly related level of detail. To date, Program System Engineering (PSE) team has been able to model each network from their top-level operational activities and system functions down to the atomic level through relational modeling decomposition. These models allow for a better understanding of the relationships between NASA's stakeholders, internal organizations, and impacts to all related entities due to integration and sustainment of existing systems. Understanding the existing systems is essential to accurate and detailed study of integration options being considered. In this paper, we identify the challenges the PSE team faced in its quest to unify complex legacy space communications networks and their operational processes. We describe the initial approaches undertaken and the evolution toward model based system engineering applied to produce Space Communication and Navigation (SCaN) PSE products. We will demonstrate the practice of Model Based System Engineering applied to integrating space communication networks and the summary of its results and impact. We will highlight the insights gained by applying the Model Based System Engineering and provide recommendations for its applications and improvements.

  9. Test, Control and Monitor System maintenance plan

    NASA Technical Reports Server (NTRS)

    Buehler, David P.; Lougheed, M. J.

    1993-01-01

    The maintenance requirements for Test, Control, and Monitor System (TCMS) and the method for satisfying these requirements prior to First Need Date (FND) of the last TCMS set are described. The method for satisfying maintenance requirements following FND of the last TCMS set will be addressed by a revision to this plan. This maintenance plan serves as the basic planning document for maintenance of this equipment by the NASA Payloads Directorate (CM) and the Payload Ground Operations Contractor (PGOC) at KSC. The terms TCMS Operations and Maintenance (O&M), Payloads Logistics, TCMS Sustaining Engineering, Payload Communications, and Integrated Network Services refer to the appropriate NASA and PGOC organization. For the duration of their contract, the Core Electronic Contractor (CEC) will provide a Set Support Team (SST). One of the primary purposes of this team is to help NASA and PGOC operate and maintain TCMS. It is assumed that SST is an integral part of TCMS O&M. The purpose of this plan is to describe the maintenance concept for TCMS hardware and system software in order to facilitate activation, transition planning, and continuing operation. When software maintenance is mentioned in this plan, it refers to maintenance of TCMS system software.

  10. Principles and Best Practices Emerging from Data Basin: A Data Platform Supporting Scientific Research and Landscape Conservation Planning

    NASA Astrophysics Data System (ADS)

    Comendant, T.; Strittholt, J. R.; Ward, B. C.; Bachelet, D. M.; Grossman, D.; Stevenson-Molnar, N.; Henifin, K.; Lundin, M.; Marvin, T. S.; Peterman, W. L.; Corrigan, G. N.; O'Connor, K.

    2013-12-01

    A multi-disciplinary team of scientists, software engineers, and outreach staff at the Conservation Biology Institute launched an open-access, web-based spatial data platform called Data Basin (www.databasin.org) in 2010. Primarily built to support research and environmental resource planning, Data Basin provides the capability for individuals and organizations to explore, create, interpret, and collaborate around their priority topics and geographies. We used a stakeholder analysis to assess the needs of data consumers/produces and help prioritize primary and secondary audiences. Data Basin's simple and user-friendly interface makes mapping and geo-processing tools more accessible to less technical audiences. Input from users is considered in system planning, testing, and implementation. The team continually develops using an agile software development approach, which allows new features, improvements, and bug fixes to be deployed to the live system on a frequent basis. The data import process is handled through administrative approval and Data Basin requires spatial data (biological, physical, and socio-economic) to be well-documented. Outreach and training is used to convey the scope and appropriate use of the scientific information and available resources.

  11. Orion Flight Performance Design Trades

    NASA Technical Reports Server (NTRS)

    Jackson, Mark C.; Straube, Timothy

    2010-01-01

    A significant portion of the Orion pre-PDR design effort has focused on balancing mass with performance. High level performance metrics include abort success rates, lunar surface coverage, landing accuracy and touchdown loads. These metrics may be converted to parameters that affect mass, such as ballast for stabilizing the abort vehicle, propellant to achieve increased lunar coverage or extended missions, or ballast to increase the lift-to-drag ratio to improve entry and landing performance. The Orion Flight Dynamics team was tasked to perform analyses to evaluate many of these trades. These analyses not only provide insight into the physics of each particular trade but, in aggregate, they illustrate the processes used by Orion to balance performance and mass margins, and thereby make design decisions. Lessons learned can be gleaned from a review of these studies which will be useful to other spacecraft system designers. These lessons fall into several categories, including: appropriate application of Monte Carlo analysis in design trades, managing margin in a highly mass-constrained environment, and the use of requirements to balance margin between subsystems and components. This paper provides a review of some of the trades and analyses conducted by the Flight Dynamics team, as well as systems engineering lessons learned.

  12. Virtual Team Meetings: Reflections on a Class Exercise Exploring Technology Choice

    ERIC Educational Resources Information Center

    Bull Schaefer, Rebecca A.; Erskine, Laura

    2012-01-01

    Students find that choosing the appropriate technology for a virtual team meeting is not as simple as it first appears. The authors describe a class exercise used to demonstrate the benefits and drawbacks of using virtual team meetings by requiring students to replace a face-to-face meeting with a virtual meeting. The exercise challenged students'…

  13. Antibiotic stewardship: does it work in hospital practice? A review of the evidence base.

    PubMed

    Hulscher, M E J L; Prins, J M

    2017-11-01

    Guidelines for developing and implementing stewardship programmes include recommendations on appropriate antibiotic use to guide the stewardship team's choice of potential stewardship objectives. They also include recommendations on behavioural change interventions to guide the team's choice of potential interventions to ensure that professionals actually use antibiotics appropriately in daily practice. To summarize the evidence base of both appropriate antibiotic use recommendations (the 'what') and behavioural change interventions (the 'how') in hospital practice. Published systematic reviews/Medline. The literature shows low-quality evidence of the positive effects of appropriate antibiotic use in hospital patients. The literature shows that any behavioural change intervention might work to ensure that professionals actually perform appropriate antibiotic use recommendations in daily practice. Although effects were overall positive, there were large differences in improvement between studies that tested similar change interventions. The literature showed a clear need for studies that apply appropriate study designs- (randomized) controlled designs-to test the effectiveness of appropriate antibiotic use on achieving meaningful outcomes. Most current studies used designs prone to confounding by indication. In the process of selecting behavioural change interventions that might work best in a chosen setting, much should be learned from behavioural sciences. The challenge for stewardship teams lies in selecting change interventions on the careful assessment of barriers and facilitators, and on a theoretical base while linking determinants to change interventions. Future studies should apply more robust designs and evaluations when assessing behavioural change interventions. Copyright © 2017 European Society of Clinical Microbiology and Infectious Diseases. Published by Elsevier Ltd. All rights reserved.

  14. What to Do Until the Money Runs Out: A Refinement Framework for Cognitive Engineering in the Real World

    NASA Technical Reports Server (NTRS)

    Shafto, Michael G.; Remington, Roger W.; Trimble, Jay W.

    1994-01-01

    A case study is presented to illustrate some of the problems of applying cognitive science to complex human-machine systems. Disregard for facts about human cognition often undermines the safety, reliability, and cost-effectiveness of complex systems. Yet single-point methods (for example, better user-interface design), whether rooted in computer science or in experimental psychology, fall far short of addressing systems-level problems in a timely way using realistic resources. A model-based methodology is proposed for organizing and prioritizing the cognitive engineering effort, focusing appropriate expertise on major problems first, then moving to more sophisticated refinements if time and resources permit. This case study is based on a collaborative effort between the Human Factors Division at NASA-Ames and the Spaceborne Imaging Radar SIR-C/X-Band Synthetic Aperture Radar (SIR-C/X-SAR) Project at the Jet Propulsion Laboratory (JPL), California institute of Technology. The first SIR-C/X-SAR Shuttle mission flew successfully in April, 1994. A series of such missions is planned to provide radar data to study Earth's ecosystems, climatic and geological processes, hydrologic cycle, and ocean circulation. In addition to JPL and NASA personnel, the SIR-C/X-SAR operations team included Scientists and engineers from the German and Italian space agencies.

  15. Toolsets Maintain Health of Complex Systems

    NASA Technical Reports Server (NTRS)

    2010-01-01

    First featured in Spinoff 2001, Qualtech Systems Inc. (QSI), of Wethersfield, Connecticut, adapted its Testability, Engineering, and Maintenance System (TEAMS) toolset under Small Business Innovation Research (SBIR) contracts from Ames Research Center to strengthen NASA's systems health management approach for its large, complex, and interconnected systems. Today, six NASA field centers utilize the TEAMS toolset, including TEAMS-Designer, TEAMS-RT, TEAMATE, and TEAMS-RDS. TEAMS is also being used on industrial systems that generate power, carry data, refine chemicals, perform medical functions, and produce semiconductor wafers. QSI finds TEAMS can lower costs by decreasing problems requiring service by 30 to 50 percent.

  16. Designing, Implementing and Maintaining a First Year Project Course in Electrical Engineering

    ERIC Educational Resources Information Center

    Lillieskold, J.; Ostlund, S.

    2008-01-01

    Being a modern electrical engineer does not only require state of the art skills in areas such as transfer and processing of information, electronics, systems engineering, and biomedical electrical engineering; it also requires generic engineering skills such as oral and written communication, team building, interpersonal skills, and the ability…

  17. An Engineering Research Program for High School Science Teachers: Year Two Changes and Results

    ERIC Educational Resources Information Center

    DeJong, Brian P.; Yelamarthi, Kumar; Kaya, Tolga

    2016-01-01

    The research experiences for teachers program at Central Michigan University was initiated to team in-service and pre-service teachers with undergraduate engineering students and engineering faculty, in an engineering research setting. During the six-week program, teachers learn engineering concepts and develop high-school instructional material…

  18. Aerospace Systems Design in NASA's Collaborative Engineering Environment

    NASA Technical Reports Server (NTRS)

    Monell, Donald W.; Piland, William M.

    1999-01-01

    Past designs of complex aerospace systems involved an environment consisting of collocated design teams with project managers, technical discipline experts, and other experts (e.g. manufacturing and systems operations). These experts were generally qualified only on the basis of past design experience and typically had access to a limited set of integrated analysis tools. These environments provided less than desirable design fidelity, often lead to the inability of assessing critical programmatic and technical issues (e.g., cost risk, technical impacts), and generally derived a design that was not necessarily optimized across the entire system. The continually changing, modern aerospace industry demands systems design processes that involve the best talent available (no matter where it resides) and access to the best design and analysis tools. A solution to these demands involves a design environment referred to as collaborative engineering. The collaborative engineering environment evolving within the National Aeronautics and Space Administration (NASA) is a capability that enables the Agency's engineering infrastructure to interact and use the best state-of-the-art tools and data across organizational boundaries. Using collaborative engineering, the collocated team is replaced with an interactive team structure where the team members are geographically distributed and the best engineering talent can be applied to the design effort regardless of physical location. In addition, a more efficient, higher quality design product is delivered by bringing together the best engineering talent with more up-to-date design and analysis tools. These tools are focused on interactive, multidisciplinary design and analysis with emphasis on the complete life cycle of the system, and they include nontraditional, integrated tools for life cycle cost estimation and risk assessment. NASA has made substantial progress during the last two years in developing a collaborative engineering environment. NASA is planning to use this collaborative engineering infrastructure to provide better aerospace systems life cycle design and analysis, which includes analytical assessment of the technical and programmatic aspects of a system from "cradle to grave." This paper describes the recent NASA developments in the area of collaborative engineering, the benefits (realized and anticipated) of using the developed capability, and the long-term plans for implementing this capability across the Agency.

  19. Aerospace Systems Design in NASA's Collaborative Engineering Environment

    NASA Astrophysics Data System (ADS)

    Monell, Donald W.; Piland, William M.

    2000-07-01

    Past designs of complex aerospace systems involved an environment consisting of collocated design teams with project managers, technical discipline experts, and other experts (e.g., manufacturing and systems operations). These experts were generally qualified only on the basis of past design experience and typically had access to a limited set of integrated analysis tools. These environments provided less than desirable design fidelity, often led to the inability of assessing critical programmatic and technical issues (e.g., cost, risk, technical impacts), and generally derived a design that was not necessarily optimized across the entire system. The continually changing, modern aerospace industry demands systems design processes that involve the best talent available (no matter where it resides) and access to the best design and analysis tools. A solution to these demands involves a design environment referred to as collaborative engineering. The collaborative engineering environment evolving within the National Aeronautics and Space Administration (NASA) is a capability that enables the Agency's engineering infrastructure to interact and use the best state-of-the-art tools and data across organizational boundaries. Using collaborative engineering, the collocated team is replaced with an interactive team structure where the team members are geographically distributed and the best engineering talent can be applied to the design effort regardless of physical location. In addition, a more efficient, higher quality design product is delivered by bringing together the best engineering talent with more up-to-date design and analysis tools. These tools are focused on interactive, multidisciplinary design and analysis with emphasis on the complete life cycle of the system, and they include nontraditional, integrated tools for life cycle cost estimation and risk assessment. NASA has made substantial progress during the last two years in developing a collaborative engineering environment. NASA is planning to use this collaborative engineering infrastructure to provide better aerospace systems life cycle design and analysis, which includes analytical assessment of the technical and programmatic aspects of a system from "cradle to grave." This paper describes the recent NASA developments in the area of collaborative engineering, the benefits (realized and anticipated) of using the developed capability, and the long-term plans for implementing this capability across the Agency.

  20. From Paper to Production: An Update on NASA's Upper Stage Engine for Exploration

    NASA Technical Reports Server (NTRS)

    Kynard, Mike

    2010-01-01

    In 2006, NASA selected an evolved variant of the proven Saturn/Apollo J-2 upper stage engine to power the Ares I crew launch vehicle upper stage and the Ares V cargo launch vehicle Earth departure stage (EDS) for the Constellation Program. Any design changes needed by the new engine would be based where possible on proven hardware from the Space Shuttle, commercial launchers, and other programs. In addition to the thrust and efficiency requirements needed for the Constellation reference missions, it would be an order of magnitude safer than past engines. It required the J-2X government/industry team to develop the highest performance engine of its type in history and develop it for use in two vehicles for two different missions. In the attempt to achieve these goals in the past five years, the Upper Stage Engine team has made significant progress, successfully passing System Requirements Review (SRR), System Design Review (SDR), Preliminary Design Review (PDR), and Critical Design Review (CDR). As of spring 2010, more than 100,000 experimental and development engine parts have been completed or are in various stages of manufacture. Approximately 1,300 of more than 1,600 engine drawings have been released for manufacturing. This progress has been due to a combination of factors: the heritage hardware starting point, advanced computer analysis, and early heritage and development component testing to understand performance, validate computer modeling, and inform design trades. This work will increase the odds of success as engine team prepares for powerpack and development engine hot fire testing in calendar 2011. This paper will provide an overview of the engine development program and progress to date.

  1. Testing for the J-2X Upper Stage Engine

    NASA Technical Reports Server (NTRS)

    Buzzell, James C.

    2010-01-01

    NASA selected the J-2X Upper Stage Engine in 2006 to power the upper stages of the Ares I crew launch vehicle and the Ares V cargo launch vehicle. Based on the proven Saturn J-2 engine, this new engine will provide 294,000 pounds of thrust and a specific impulse of 448 seconds, making it the most efficient gas generator cycle engine in history. The engine's guiding philosophy emerged from the Exploration Systems Architecture Study (ESAS) in 2005. Goals established then called for vehicles and components based, where feasible, on proven hardware from the Space Shuttle, commercial, and other programs, to perform the mission and provide an order of magnitude greater safety. Since that time, the team has made unprecedented progress. Ahead of the other elements of the Constellation Program architecture, the team has progressed through System Requirements Review (SRR), System Design Review (SDR), Preliminary Design Review (PDR), and Critical Design Review (CDR). As of February 2010, more than 100,000 development engine parts have been ordered and more than 18,000 delivered. Approximately 1,300 of more than 1,600 engine drawings were released for manufacturing. A major factor in the J-2X development approach to this point is testing operations of heritage J-2 engine hardware and new J-2X components to understand heritage performance, validate computer modeling of development components, mitigate risk early in development, and inform design trades. This testing has been performed both by NASA and its J-2X prime contractor, Pratt & Whitney Rocketdyne (PWR). This body of work increases the likelihood of success as the team prepares for testing the J-2X powerpack and first development engine in calendar 2011. This paper will provide highlights of J-2X testing operations, engine test facilities, development hardware, and plans.

  2. KSC-2013-3537

    NASA Image and Video Library

    2013-09-11

    CAPE CANAVERAL, Fla. – A remote-controlled helicopter with a unique set of sensors and software assembled by a team of engineers from NASA's Johnson Space Center flies in a competition at the agency's Kennedy Space Center. Teams from Johnson, Kennedy and Marshall Space Flight Center competed in an unmanned aerial systems event to evaluate designs and work by engineers learning new specialties. The competition took place at the Shuttle Landing Facility at Kennedy. Photo credit: NASA/Dmitri Gerondidakis

  3. KSC-2013-3536

    NASA Image and Video Library

    2013-09-11

    CAPE CANAVERAL, Fla. – A remote-controlled helicopter with a unique set of sensors and software assembled by a team of engineers from NASA's Johnson Space Center flies in a competition at the agency's Kennedy Space Center. Teams from Johnson, Kennedy and Marshall Space Flight Center competed in an unmanned aerial systems event to evaluate designs and work by engineers learning new specialties. The competition took place at the Shuttle Landing Facility at Kennedy. Photo credit: NASA/Dmitri Gerondidakis

  4. The Preparation for and Execution of Engineering Operations for the Mars Curiosity Rover Mission

    NASA Technical Reports Server (NTRS)

    Samuels, Jessica A.

    2013-01-01

    The Mars Science Laboratory Curiosity Rover mission is the most complex and scientifically packed rover that has ever been operated on the surface of Mars. The preparation leading up to the surface mission involved various tests, contingency planning and integration of plans between various teams and scientists for determining how operation of the spacecraft (s/c) would be facilitated. In addition, a focused set of initial set of health checks needed to be defined and created in order to ensure successful operation of rover subsystems before embarking on a two year science journey. This paper will define the role and responsibilities of the Engineering Operations team, the process involved in preparing the team for rover surface operations, the predefined engineering activities performed during the early portion of the mission, and the evaluation process used for initial and day to day spacecraft operational assessment.

  5. Table-Top Robotics for Engineering Design

    ERIC Educational Resources Information Center

    Wilczynski, Vincent; Dixon, Gregg; Ford, Eric

    2005-01-01

    The Mechanical Engineering Section at the U.S. Coast Guard Academy has developed a comprehensive activity based course to introduce second year students to mechanical engineering design. The culminating design activity for the course requires students to design, construct and test robotic devices that complete engineering challenges. Teams of…

  6. Engineering Encounters: Catch Me if You Can!

    ERIC Educational Resources Information Center

    Lott, Kimberly; Wallin, Mark; Roghaar, Deborah; Price, Tyson

    2013-01-01

    A science, technology, engineering, and math (STEM) activity is any activity that integrates the use of science, technology, engineering, and mathematics to solve a problem. Traditionally, STEM activities are highly engaging and may involve competition among student teams. Young children are natural engineers and often times spontaneously build…

  7. uCollaborator: Framework for STEM Project Collaboration among Geographically-Dispersed Student/Faculty Teams

    ERIC Educational Resources Information Center

    Fiore, Stephen M.; Rodriguez, Walter E.; Carstens, Deborah S.

    2012-01-01

    This paper presents a framework for facilitating communication among STEM project teams that are geographically dispersed in synchronous or asynchronous online courses. The framework has been developed to: (a) improve how engineering and technology students and faculty work with collocated and geographically-dispersed teams; and (b) to connect the…

  8. An Evaluation of Student Team Teaching in Sophomore Physics Classes. Final Report.

    ERIC Educational Resources Information Center

    Thrasher, Paul H.

    In the present document the effectiveness of a student team teaching technique is evaluated in comparison with the lecture method. The team teaching technique, previously used for upper division and graduate physics courses, was, for this study, used in a sophomore physics, electricity and magnetism course for engineers, mathematicians, chemists,…

  9. NREL: U.S. Life Cycle Inventory Database - Project Management Team

    Science.gov Websites

    Project Management Team Information about the U.S. Life Cycle Inventory (LCI) Database project management team is listed on this page. Additional project information is available about the U.S. LCI Mechanical Engineering, Colorado State University Professional History Michael has worked as a Senior

  10. Designing and Building a Cardboard Chair: Children's Engineering at the TECA Eastern Regional Conference

    ERIC Educational Resources Information Center

    Linnell, Charles C.

    2007-01-01

    This article describes the 2006 Technology Education Collegiate Association (TECA) Eastern Regional elementary competition, wherein teams of technology education students from nine different universities designed and built cardboard chairs. The competition required the teams (four or five to a team) from universities up and down the East Coast to…

  11. Also a Centennial Year for Ernest Orlando Lawrence

    Science.gov Websites

    research with multidisciplinary teams of scientists and engineers-the team-based approach to modern science should be remembered as the inventor of the modern way of doing science," said Lawrence team member Revolutionary Idea that Changed Modern Physics A Few Important Events in Lawrence's Life E.O. Lawrence

  12. The KSC Simulation Team practices for contingencies in Firing Room 1

    NASA Technical Reports Server (NTRS)

    1998-01-01

    In Firing Room 1 at KSC, Shuttle launch team members put the Shuttle system through an integrated simulation. The control room is set up with software used to simulate flight and ground systems in the launch configuration. A Simulation Team, comprised of KSC engineers, introduce 12 or more major problems to prepare the launch team for worst-case scenarios. Such tests and simulations keep the Shuttle launch team sharp and ready for liftoff. The next liftoff is targeted for Oct. 29.

  13. Achieving Agility and Stability in Large-Scale Software Development

    DTIC Science & Technology

    2013-01-16

    temporary team is assigned to prepare layers and frameworks for future feature teams. Presentation Layer Domain Layer Data Access Layer...http://www.sei.cmu.edu/training/ elearning ~ Software Engineering Institute CarnegieMellon

  14. Assessing and evaluating multidisciplinary translational teams: a mixed methods approach.

    PubMed

    Wooten, Kevin C; Rose, Robert M; Ostir, Glenn V; Calhoun, William J; Ameredes, Bill T; Brasier, Allan R

    2014-03-01

    A case report illustrates how multidisciplinary translational teams can be assessed using outcome, process, and developmental types of evaluation using a mixed-methods approach. Types of evaluation appropriate for teams are considered in relation to relevant research questions and assessment methods. Logic models are applied to scientific projects and team development to inform choices between methods within a mixed-methods design. Use of an expert panel is reviewed, culminating in consensus ratings of 11 multidisciplinary teams and a final evaluation within a team-type taxonomy. Based on team maturation and scientific progress, teams were designated as (a) early in development, (b) traditional, (c) process focused, or (d) exemplary. Lessons learned from data reduction, use of mixed methods, and use of expert panels are explored.

  15. KSC-99pp0275

    NASA Image and Video Library

    1999-03-06

    Robots, maneuvered by student teams behind protective walls, raise their caches of pillow-like disks to earn points in competition while spectators in the bleachers and on the sidelines cheer their favorite teams. Held at the KSC Visitor Complex, the 1999 Southeastern Regional robotic competition, sponsored by the nonprofit organization For Inspiration and Recognition of Science and Technology, known as FIRST, comprises 27 teams pairing high school students with engineer mentors and corporations, pitting gladiator robots against each other in an athletic-style competition. Powered by 12-volt batteries and operated by remote control, the robotic gladiators spend two minutes each trying to grab, claw and hoist the pillows onto their machines. Teams play defense by taking away competitors' pillows and generally harassing opposing machines. The FIRST robotics competition is designed to provide students with a hands-on, inside look at engineering and other professional careers

  16. Pneumatic injection system using a hot exhaust gases, developed in Institute of Automobiles and Internal Combustion Engines of Cracow University of Technology

    NASA Astrophysics Data System (ADS)

    Marek, W.; Śliwiński, K.

    2016-09-01

    The article concerns research carried out by the Krakow University of Technology on the concept of a pneumatic fuel injection spark ignition engines. In this artkule an example of an application of this type of power to the Wankel's engine, together with a description of its design and operating principles and the benefits of its use. The work was carried out over many years by Prof. Stanislaw Jarnuszkiewicz despite the development of many patents but not widely used in engines. Authors who were involved in the team-work of the team of Prof. Jarnuszkiewicz, after conducting exploratory studies, believed that this solution has development potential and this will be presented in future articles.

  17. Effective Engineering Outreach through an Undergraduate Mentoring Team and Module Database

    ERIC Educational Resources Information Center

    Young, Colin; Butterfield, Anthony E.

    2014-01-01

    The rising need for engineers has led to increased interest in community outreach in engineering departments nationwide. We present a sustainable outreach model involving trained undergraduate mentors to build ties with K-12 teachers and students. An associated online module database of chemical engineering demonstrations, available to educators…

  18. AJ26 engine test

    NASA Image and Video Library

    2011-11-17

    A team of engineers at Stennis Space Center conducted a test firing of an Aerojet AJ26 flight engine Nov. 17, providing continued support to Orbital Sciences Corporation as it prepares to launch commercial cargo missions to the International Space Station. AJ26 engines will power Orbital's Taurus II rocket on the missions.

  19. Nurturing Competitive Teamwork with Individual Excellence in an Engineering Classroom

    ERIC Educational Resources Information Center

    Kanyarusoke, Kant E.

    2017-01-01

    Team working and business competitiveness awareness are valuable skills for engineering graduates. This paper describes one way to nurture them while motivating individual student excellence in a normal engineering course. In six years, four groups of students were nurtured through real engineering business situations in a model similar to…

  20. Documenting the Engineering Design Process

    ERIC Educational Resources Information Center

    Hollers, Brent

    2017-01-01

    Documentation of ideas and the engineering design process is a critical, daily component of a professional engineer's job. While patent protection is often cited as the primary rationale for documentation, it can also benefit the engineer, the team, company, and stakeholders through creating a more rigorously designed and purposeful solution.…

  1. Trends in U.S. Engineering and Engineering Technology: A Comparative Study of Admissions, Curricula, and Employment.

    ERIC Educational Resources Information Center

    Lebold, W. K.; Lebold, D. J.

    1985-01-01

    Discusses the admissions selection practices, educational programs, quality standards, and employment characteristics of engineering and engineering technology in the United States. The importance of these two occupations as part of technical teams (which include scientists and technicians) is documented and stressed. (JN)

  2. How to renovate a 50-year-old wastewater treating plant: Part 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hunter, M.L.

    1996-01-01

    How does an existing refinery cost-effectively renovate wastewater/stormwater treating systems to meet today`s environmental regulations and standards? Faced with solving this problem, Amoco`s Whiting Refinery developed a project team consisting of plant and operations engineers, corporate project and design engineers, contractors and vendors to map out a strategy to re-engineer the existing wastewater treating plant (WWTP) and auxiliary functions. This case history shows how an old refinery limited by existing equipment, building space, operation`s availability requirements and costs divided the project into several design phases. The design team used a proactive approach with empowerment responsibilities to solve construction, equipment usagemore » and regulatory problems throughout the project`s lifetime. Focusing on front-end planning and customer service (the refinery), team members applied value-based engineering designs to keep costs down, implemented safe work practices during construction, used HAZOP reviews to scrutinize proposed designs for operating and maintenance procedures, etc. The result has been the renovation of a 50-year-old WWTP completed under budget, ontime and in compliance with federal mandates.« less

  3. 32 CFR 185.1 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Provides for continuation of the DoD Regional Military Emergency Coordinator (RMEC) teams, previously... teams of DoD liaison personnel to represent essential DoD Components, as appropriate, for response to... programs, in cooperation with the Federal Emergency Management Agency (FEMA), under the authority of The...

  4. Breaking the Silos: The art Documentation Suite

    NASA Astrophysics Data System (ADS)

    Kutschke, Robert K.

    2015-12-01

    The art event-processing framework is used by almost all new experiments at Fermilab, and by several outside of Fermilab. All use art as an external product in the same sense that the compiler, ROOT, Geant4, CLHEP and boost are external products. The art team has embarked on a campaign to document art and develop training materials for new users. Many new users of art have little or no knowledge of C++, software engineering, build systems or the many external packages used by art or their experiments, such as ROOT, CLHEP, HEPPDT, and boost. To effectively teach art requires that the training materials include appropriate introductions to these topics as they are encountered. Experience has shown that simply referring readers to the existing native documentation does not work; too often a simple idea that they need to understand is described in a context that presumes prerequisites that are unimportant for a beginning user of art. There is the additional complication that the training materials must be presented in a way that does not presume knowledge of any of the experiments using art. Finally, new users of art arrive at random times throughout the year and the training materials must allow them to start to learn art at any time. This presentation will explain the strategies adopted by the art team to develop a documentation suite that complies with these boundary conditions. It will also show the present status of the documentation suite, including feedback the art team has received from pilot users.

  5. The Public Sector Construction Industry: Analysis of Single-Project Partnering

    DTIC Science & Technology

    1992-12-22

    thesis advisor, Dr. Fred Moavenzadeh for his guidance and encouragement. Colonel Larry S. Bonine , U.S. Army (Retired) and the members of his Partnering...PROJECT (CkG) ENGINEERS MANAGERS PR::JECT PARINERING TEAM Figure 4-4. Central Artery/Tunnel Organizational Chart. 116 MR. Larry Bonine an employee of the...joint venture team. MR. Bonine is an ex-Army Colonel and was the Corps District Engineer in Mobile, Alabama who oversaw the Oliver Lock and Dam and

  6. KSC-2013-3533

    NASA Image and Video Library

    2013-09-11

    CAPE CANAVERAL, Fla. – A remote-controlled helicopter with a unique set of sensors and software assembled by a team of engineers from NASA's Johnson Space Center prepares to fly in a competition at the agency's Kennedy Space Center. Teams from Johnson, Kennedy and Marshall Space Flight Center competed in an unmanned aerial systems event to evaluate designs and work by engineers learning new specialties. The competition took place at the Shuttle Landing Facility at Kennedy. Photo credit: NASA/Dmitri Gerondidakis

  7. NASA team hosts STEM-Ulate actvities

    NASA Image and Video Library

    2010-07-13

    Young visitors to NASA's John C. Stennis Space Center prepare to launch 'stomp rockets' during STEM-Ulate to Innovate activities at the facility July 13. The NASA Foundations of Influence, Relationships, Success and Teamwork (FIRST) Team sponsored STEM-Ulate to Innovate for more than 100 children ages 9-11. Children from area Boys & Girls Clubs participated in hands-on activities, presentations and demonstrations by professional engineers, all designed to promote the relevance of science, technology, engineering and mathematics (STEM).

  8. ESMD Risk Management Workshop: Systems Engineering and Integration Risks

    NASA Technical Reports Server (NTRS)

    Thomas, L. Dale

    2005-01-01

    This report has been developed by the National Aeronautics and Space Administration (NASA) Exploration Systems Mission Directorate (ESMD) Risk Management team in close coordination with the Systems Engineering Team. This document provides a point-in-time, cumulative, summary of key lessons learned derived from the SE RFP Development process. Lessons learned invariably address challenges and risks and the way in which these areas have been addressed. Accordingly the risk management thread is woven throughout the document.

  9. NCC: A Multidisciplinary Design/Analysis Tool for Combustion Systems

    NASA Technical Reports Server (NTRS)

    Liu, Nan-Suey; Quealy, Angela

    1999-01-01

    A multi-disciplinary design/analysis tool for combustion systems is critical for optimizing the low-emission, high-performance combustor design process. Based on discussions between NASA Lewis Research Center and the jet engine companies, an industry-government team was formed in early 1995 to develop the National Combustion Code (NCC), which is an integrated system of computer codes for the design and analysis of combustion systems. NCC has advanced features that address the need to meet designer's requirements such as "assured accuracy", "fast turnaround", and "acceptable cost". The NCC development team is comprised of Allison Engine Company (Allison), CFD Research Corporation (CFDRC), GE Aircraft Engines (GEAE), NASA Lewis Research Center (LeRC), and Pratt & Whitney (P&W). This development team operates under the guidance of the NCC steering committee. The "unstructured mesh" capability and "parallel computing" are fundamental features of NCC from its inception. The NCC system is composed of a set of "elements" which includes grid generator, main flow solver, turbulence module, turbulence and chemistry interaction module, chemistry module, spray module, radiation heat transfer module, data visualization module, and a post-processor for evaluating engine performance parameters. Each element may have contributions from several team members. Such a multi-source multi-element system needs to be integrated in a way that facilitates inter-module data communication, flexibility in module selection, and ease of integration.

  10. Achieving Agility and Stability in Large-Scale Software Development

    DTIC Science & Technology

    2013-01-16

    temporary team is assigned to prepare layers and frameworks for future feature teams. Presentation Layer Domain Layer Data Access Layer Framework...http://www.sei.cmu.edu/training/ elearning ~ Software Engineering Institute CarnegieMellon

  11. 77 FR 40026 - 36(b)(1) Arms Sales Notification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-06

    ... and contractor logistics, Quality Assurance Team support services, engineering and technical support..., engineering and technical support, and other related elements of program support. The estimated cost is $49..., maintenance, or training is Confidential. Reverse engineering could reveal Confidential information...

  12. DESCRIPTION OF RISK REDUCTION ENGINEERING LABORATORY TEST AND EVALUATION FACILITIES

    EPA Science Inventory

    An onsite team of multidisciplined engineers and scientists conduct research and provide technical services in the areas of testing, design, and field implementation for both solid and hazardous waste management. Engineering services focus on the design and implementation of...

  13. Ability to Assent in Pediatric Critical Care Research: A Prospective Environmental Scan of Two Canadian PICUs.

    PubMed

    O'Hearn, Katharine J; Martin, Dori-Ann; Dagenais, Maryse; Menon, Kusum

    2018-06-13

    To determine the number of patients considered not appropriate to approach for assent within the first 24 hours of PICU admission. Exploratory prospective 1-month environmental scan. Two tertiary Canadian PICUs. Ninety patients age newborn to 17 years old admitted to the PICU during September 2016 (Site 1) or May 2017 (Site 2). None. At PICU admission, 81% of patients were deemed not appropriate to approach for assent most commonly due to age, influence of psychotropic medications, and/or mechanical ventilation. At PICU discharge, 74% of patients were considered not appropriate to approach, most commonly due to age and/or developmental delay. There was moderate to good agreement between the research team and care team assessments of appropriateness for assent. Only 8% of patients considered not approachable at admission become appropriate to approach for assent by PICU discharge. Very few patients were considered approachable for assent during the first 24 hours of PICU admission. Those who were considered appropriate to approach were less ill, spent less time in PICU, and were unlikely to be considered for enrollment in pediatric critical care research.

  14. Hands Off: Mentoring a Student-Led Robotics Team

    ERIC Educational Resources Information Center

    Dolenc, Nathan R.; Mitchell, Claire E.; Tai, Robert H.

    2016-01-01

    Mentors play important roles in determining the working environment of out-of-school-time clubs. On robotics teams, they provide guidance in hopes that their protégés progress through an engineering process. This study examined how mentors on one robotics team who defined their mentoring style as "let the students do the work" navigated…

  15. Academic Alignment to Reduce the Presence of "Social Loafers" and "Diligent Isolates" in Student Teams

    ERIC Educational Resources Information Center

    Pieterse, Vreda; Thompson, Lisa

    2010-01-01

    The acquisition of effective teamwork skills is crucial in all disciplines. Using an interpretive approach, this study investigates collaboration and co-operation in teams of software engineering students. Teams whose members were both homogeneous and heterogeneous in terms of their members' academic abilities, skills and goals were identified and…

  16. The (mis)use of subjective process measures in software engineering

    NASA Technical Reports Server (NTRS)

    Valett, Jon D.; Condon, Steven E.

    1993-01-01

    A variety of measures are used in software engineering research to develop an understanding of the software process and product. These measures fall into three broad categories: quantitative, characteristics, and subjective. Quantitative measures are those to which a numerical value can be assigned, for example effort or lines of code (LOC). Characteristics describe the software process or product; they might include programming language or the type of application. While such factors do not provide a quantitative measurement of a process or product, they do help characterize them. Subjective measures (as defined in this study) are those that are based on the opinion or opinions of individuals; they are somewhat unique and difficult to quantify. Capturing of subjective measure data typically involves development of some type of scale. For example, 'team experience' is one of the subjective measures that were collected and studied by the Software Engineering Laboratory (SEL). Certainly, team experience could have an impact on the software process or product; actually measuring a team's experience, however, is not a strictly mathematical exercise. Simply adding up each team member's years of experience appears inadequate. In fact, most researchers would agree that 'years' do not directly translate into 'experience.' Team experience must be defined subjectively and then a scale must be developed e.g., high experience versus low experience; or high, medium, low experience; or a different or more granular scale. Using this type of scale, a particular team's overall experience can be compared with that of other teams in the development environment. Defining, collecting, and scaling subjective measures is difficult. First, precise definitions of the measures must be established. Next, choices must be made about whose opinions will be solicited to constitute the data. Finally, care must be given to defining the right scale and level of granularity for measurement.

  17. Model building techniques for analysis.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Walther, Howard P.; McDaniel, Karen Lynn; Keener, Donald

    2009-09-01

    The practice of mechanical engineering for product development has evolved into a complex activity that requires a team of specialists for success. Sandia National Laboratories (SNL) has product engineers, mechanical designers, design engineers, manufacturing engineers, mechanical analysts and experimentalists, qualification engineers, and others that contribute through product realization teams to develop new mechanical hardware. The goal of SNL's Design Group is to change product development by enabling design teams to collaborate within a virtual model-based environment whereby analysis is used to guide design decisions. Computer-aided design (CAD) models using PTC's Pro/ENGINEER software tools are heavily relied upon in the productmore » definition stage of parts and assemblies at SNL. The three-dimensional CAD solid model acts as the design solid model that is filled with all of the detailed design definition needed to manufacture the parts. Analysis is an important part of the product development process. The CAD design solid model (DSM) is the foundation for the creation of the analysis solid model (ASM). Creating an ASM from the DSM currently is a time-consuming effort; the turnaround time for results of a design needs to be decreased to have an impact on the overall product development. This effort can be decreased immensely through simple Pro/ENGINEER modeling techniques that summarize to the method features are created in a part model. This document contains recommended modeling techniques that increase the efficiency of the creation of the ASM from the DSM.« less

  18. AERL Baseball Team

    NASA Image and Video Library

    1943-10-21

    The NACA’s Aircraft Engine Research Laboratory’s baseball team photographed with director Raymond Sharp. The Exchange, which operated the non-profit cafeteria, sponsored several sports teams that participated in local leagues. The laboratory also had several intramural sports leagues. The baseball team, seen here in 1943, was suspended shortly thereafter as many of its members entered the military during World War II. The team was reconstituted after the war and became somewhat successful in the Class A Westlake League. After winning the championship in 1949 and 1950, the team was placed in the more advanced Middleberg League where they struggled.

  19. Repository-Based Software Engineering Program: Working Program Management Plan

    NASA Technical Reports Server (NTRS)

    1993-01-01

    Repository-Based Software Engineering Program (RBSE) is a National Aeronautics and Space Administration (NASA) sponsored program dedicated to introducing and supporting common, effective approaches to software engineering practices. The process of conceiving, designing, building, and maintaining software systems by using existing software assets that are stored in a specialized operational reuse library or repository, accessible to system designers, is the foundation of the program. In addition to operating a software repository, RBSE promotes (1) software engineering technology transfer, (2) academic and instructional support of reuse programs, (3) the use of common software engineering standards and practices, (4) software reuse technology research, and (5) interoperability between reuse libraries. This Program Management Plan (PMP) is intended to communicate program goals and objectives, describe major work areas, and define a management report and control process. This process will assist the Program Manager, University of Houston at Clear Lake (UHCL) in tracking work progress and describing major program activities to NASA management. The goal of this PMP is to make managing the RBSE program a relatively easy process that improves the work of all team members. The PMP describes work areas addressed and work efforts being accomplished by the program; however, it is not intended as a complete description of the program. Its focus is on providing management tools and management processes for monitoring, evaluating, and administering the program; and it includes schedules for charting milestones and deliveries of program products. The PMP was developed by soliciting and obtaining guidance from appropriate program participants, analyzing program management guidance, and reviewing related program management documents.

  20. The BRIGHTEN program: implementation and evaluation of a program to bridge resources of an interdisciplinary geriatric health team via electronic networking.

    PubMed

    Emery, Erin E; Lapidos, Stan; Eisenstein, Amy R; Ivan, Iulia I; Golden, Robyn L

    2012-12-01

    To demonstrate the feasibility of the BRIGHTEN Program (Bridging Resources of an Interdisciplinary Geriatric Health Team via Electronic Networking), an interdisciplinary team intervention for assessing and treating older adults for depression in outpatient primary and specialty medical clinics. The BRIGHTEN team collaborates "virtually" to review patient assessment results, develop a treatment plan, and refer to appropriate team members for follow-up care. Older adults in 9 academic medical center clinics and 2 community-based clinics completed screening forms for symptoms of depression and anxiety. Those with positive screens engaged in comprehensive assessment with the BRIGHTEN Program Coordinator; the BRIGHTEN virtual team provided treatment recommendations based on the results of assessment. A collaborative treatment plan was developed with each participant, who was then connected to appropriate services. Two thousand four hundred twenty-two older adults were screened in participating clinics over a 40-month period. Eight hundred fifty-nine older adults screened positive, and 150 elected to enroll in BRIGHTEN. From baseline to 6 months, significant improvements were found in depression symptoms (Geriatric Depression Scale, p < .01) and general mental health (SF-12 Mental Component, p < .01). The BRIGHTEN Program demonstrated that an interdisciplinary virtual team linked with outpatient medical clinics can be an effective, nonthreatening, and seamless approach to enable older adults to access treatment for depression.

  1. When Violence Threatens the Campus Workplace.

    ERIC Educational Resources Information Center

    Willits, Bob

    1994-01-01

    A combination of economic and societal stresses contributes to workplace violence in higher education. College human resources professionals must become knowledgeable about its causes, implications, prevention, and appropriate responses. A three-tiered plan includes a preventive program, threat-management plan and team, and crisis management team.…

  2. 78 FR 24694 - Family Advocacy Command Assistance Team (FACAT)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-26

    ... be composed of personnel from appropriate disciplines, including, medicine, psychology, and child... in all allegations of child abuse and neglect. DATES: Comments must be received by June 25, 2013... multi-disciplinary Family Advocacy Command Assistant Team to respond to allegations of child sexual...

  3. Assessing and Evaluating Multidisciplinary Translational Teams: A Mixed Methods Approach

    PubMed Central

    Wooten, Kevin C.; Rose, Robert M.; Ostir, Glenn V.; Calhoun, William J.; Ameredes, Bill T.; Brasier, Allan R.

    2014-01-01

    A case report illustrates how multidisciplinary translational teams can be assessed using outcome, process, and developmental types of evaluation using a mixed methods approach. Types of evaluation appropriate for teams are considered in relation to relevant research questions and assessment methods. Logic models are applied to scientific projects and team development to inform choices between methods within a mixed methods design. Use of an expert panel is reviewed, culminating in consensus ratings of 11 multidisciplinary teams and a final evaluation within a team type taxonomy. Based on team maturation and scientific progress, teams were designated as: a) early in development, b) traditional, c) process focused, or d) exemplary. Lessons learned from data reduction, use of mixed methods, and use of expert panels are explored. PMID:24064432

  4. Patent Information Use in Engineering Technology Design: An Analysis of Student Work

    ERIC Educational Resources Information Center

    Phillips, Margaret; Zwicky, Dave

    2017-01-01

    How might engineering technology students make use of patent information in the engineering design process? Librarians analyzed team project reports and personal reflections created by students in an undergraduate mechanical engineering technology design course, revealing that the students used patents to consider the patentability of their ideas,…

  5. Large Liquid Rocket Testing: Strategies and Challenges

    NASA Technical Reports Server (NTRS)

    Rahman, Shamim A.; Hebert, Bartt J.

    2005-01-01

    Rocket propulsion development is enabled by rigorous ground testing in order to mitigate the propulsion systems risks that are inherent in space flight. This is true for virtually all propulsive devices of a space vehicle including liquid and solid rocket propulsion, chemical and non-chemical propulsion, boost stage and in-space propulsion and so forth. In particular, large liquid rocket propulsion development and testing over the past five decades of human and robotic space flight has involved a combination of component-level testing and engine-level testing to first demonstrate that the propulsion devices were designed to meet the specified requirements for the Earth to Orbit launchers that they powered. This was followed by a vigorous test campaign to demonstrate the designed propulsion articles over the required operational envelope, and over robust margins, such that a sufficiently reliable propulsion system is delivered prior to first flight. It is possible that hundreds of tests, and on the order of a hundred thousand test seconds, are needed to achieve a high-reliability, flight-ready, liquid rocket engine system. This paper overviews aspects of earlier and recent experience of liquid rocket propulsion testing at NASA Stennis Space Center, where full scale flight engines and flight stages, as well as a significant amount of development testing has taken place in the past decade. The liquid rocket testing experience discussed includes testing of engine components (gas generators, preburners, thrust chambers, pumps, powerheads), as well as engine systems and complete stages. The number of tests, accumulated test seconds, and years of test stand occupancy needed to meet varying test objectives, will be selectively discussed and compared for the wide variety of ground test work that has been conducted at Stennis for subscale and full scale liquid rocket devices. Since rocket propulsion is a crucial long-lead element of any space system acquisition or development, the appropriate plan and strategy must be put in place at the outset of the development effort. A deferment of this test planning, or inattention to strategy, will compromise the ability of the development program to achieve its systems reliability requirements and/or its development milestones. It is important for the government leadership and support team, as well as the vehicle and propulsion development team, to give early consideration to this aspect of space propulsion and space transportation work.

  6. Structure and Management of an Engineering Senior Design Course.

    PubMed

    Tanaka, Martin L; Fischer, Kenneth J

    2016-07-01

    The design of products and processes is an important area in engineering. Students in engineering schools learn fundamental principles in their courses but often lack an opportunity to apply these methods to real-world problems until their senior year. This article describes important elements that should be incorporated into a senior capstone design course. It includes a description of the general principles used in engineering design and a discussion of why students often have difficulty with application and revert to trial and error methods. The structure of a properly designed capstone course is dissected and its individual components are evaluated. Major components include assessing resources, identifying projects, establishing teams, understanding requirements, developing conceptual designs, creating detailed designs, building prototypes, testing performance, and final presentations. In addition to the course design, team management and effective mentoring are critical to success. This article includes suggested guidelines and tips for effective design team leadership, attention to detail, investment of time, and managing project scope. Furthermore, the importance of understanding business culture, displaying professionalism, and considerations of different types of senior projects is discussed. Through a well-designed course and proper mentoring, students will learn to apply their engineering skills and gain basic business knowledge that will prepare them for entry-level positions in industry.

  7. Mobilising a team for the WHO Surgical Safety Checklist: a qualitative video study.

    PubMed

    Korkiakangas, Terhi

    2017-03-01

    One challenge identified in the Surgical Safety Checklist literature is the inconsistent participation of operating teams in the safety checks. Less is known about how teams move from preparatory activities into a huddle, and how communication underpins this gathering. The objective of this study is to examine the ways of mobilising teams and the level of participation in the safety checks. Team participation in time-out and sign-out was examined from a video corpus of 20 elective surgical operations. Teams included surgeons, nurses and anaesthetists in a UK teaching hospital, scheduled to work in the operations observed. Qualitative video analysis of team participation was adapted from the study of social interaction. The key aspects of team mobilisation were the timing of the checklist, the distribution of personnel in the theatre and the instigation practices used. These were interlinked in bringing about the participation outcomes, the number of people huddling up for time-out and sign-out. Timing seemed appropriate when most personnel were present in the theatre suite; poor timing was marked by personnel dispersed through the theatre. Participation could be managed using the instigation practices, which included or excluded participation within teams. The factors hindering full-team participation at time-out and sign-out were the overlapping (eg, anaesthetic and nursing) responsibilities and the use of exclusive instigation practices. The implementation of the Surgical Safety Checklist represents a global concern in patient safety research. Yet how teams huddle for the checks has to be acknowledged as an issue in its own right. Appropriate mobilisation practices can help bringing fuller teams together, which has direct relevance to team training. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/.

  8. Energy Conservation Projects to Benefit the Railroad Industry

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clifford Mirman; Promod Vohra

    The Energy Conservation Projects to benefit the railroad industry using the Norfolk Southern Company as a model for the railroad industry has five unique tasks which are in areas of importance within the rail industry, and specifically in the area of energy conservation. The NIU Engineering and Technology research team looked at five significant areas in which research and development work can provide unique solutions to the railroad industry in energy the conservation. (1) Alternate Fuels - An examination of various blends of bio-based diesel fuels for the railroad industry, using Norfolk Southern as a model for the industry. Themore » team determined that bio-diesel fuel is a suitable alternative to using straight diesel fuel, however, the cost and availability across the country varies to a great extent. (2) Utilization of fuel cells for locomotive power systems - While the application of the fuel cell has been successfully demonstrated in the passenger car, this is a very advanced topic for the railroad industry. There are many safety and power issues that the research team examined. (3) Thermal and emission reduction for current large scale diesel engines - The current locomotive system generates large amount of heat through engine cooling and heat dissipation when the traction motors are used to decelerate the train. The research team evaluated thermal management systems to efficiently deal with large thermal loads developed by the operating engines. (4) Use of Composite and Exotic Replacement Materials - Research team redesigned various components using new materials, coatings, and processes to provide the needed protection. Through design, analysis, and testing, new parts that can withstand the hostile environments were developed. (5) Tribology Applications - Identification of tribology issues in the Railroad industry which play a significant role in the improvement of energy usage. Research team analyzed and developed solutions which resulted in friction modification to improve energy efficiency.« less

  9. Propulsion Technology Lifecycle Operational Analysis

    NASA Technical Reports Server (NTRS)

    Robinson, John W.; Rhodes, Russell E.

    2010-01-01

    The paper presents the results of a focused effort performed by the members of the Space Propulsion Synergy Team (SPST) Functional Requirements Sub-team to develop propulsion data to support Advanced Technology Lifecycle Analysis System (ATLAS). This is a spreadsheet application to analyze the impact of technology decisions at a system-of-systems level. Results are summarized in an Excel workbook we call the Technology Tool Box (TTB). The TTB provides data for technology performance, operations, and programmatic parameters in the form of a library of technical information to support analysis tools and/or models. The lifecycle of technologies can be analyzed from this data and particularly useful for system operations involving long running missions. The propulsion technologies in this paper are listed against Chemical Rocket Engines in a Work Breakdown Structure (WBS) format. The overall effort involved establishing four elements: (1) A general purpose Functional System Breakdown Structure (FSBS). (2) Operational Requirements for Rocket Engines. (3) Technology Metric Values associated with Operating Systems (4) Work Breakdown Structure (WBS) of Chemical Rocket Engines The list of Chemical Rocket Engines identified in the WBS is by no means complete. It is planned to update the TTB with a more complete list of available Chemical Rocket Engines for United States (US) engines and add the Foreign rocket engines to the WBS which are available to NASA and the Aerospace Industry. The Operational Technology Metric Values were derived by the SPST Sub-team in the form of the TTB and establishes a database for users to help evaluate and establish the technology level of each Chemical Rocket Engine in the database. The Technology Metric Values will serve as a guide to help determine which rocket engine to invest technology money in for future development.

  10. KSC-2013-3542

    NASA Image and Video Library

    2013-09-11

    CAPE CANAVERAL, Fla. – A remote-controlled aircraft flies during a competition with a unique set of sensors and software to conduct a mock search-and-rescue operation. The aircraft was assembled by a team of engineers from NASA's Kennedy Space Center. Teams from Johnson Space Center, Kennedy and Marshall Space Flight Center competed in the unmanned aerial systems event to evaluate designs and work by engineers learning new specialties. The competition took place at the Shuttle Landing Facility at Kennedy. Photo credit: NASA/Dmitri Gerondidakis

  11. KSC-2013-3543

    NASA Image and Video Library

    2013-09-11

    CAPE CANAVERAL, Fla. – A remote-controlled aircraft flies during a competition with a unique set of sensors and software to conduct a mock search-and-rescue operation. The aircraft was assembled by a team of engineers from NASA's Kennedy Space Center. Teams from Johnson Space Center, Kennedy and Marshall Space Flight Center competed in the unmanned aerial systems event to evaluate designs and work by engineers learning new specialties. The competition took place at the Shuttle Landing Facility at Kennedy. Photo credit: NASA/Dmitri Gerondidakis

  12. KSC-2013-3546

    NASA Image and Video Library

    2013-09-11

    CAPE CANAVERAL, Fla. – A remote-controlled aircraft flies during a competition with a unique set of sensors and software to conduct a mock search-and-rescue operation. The aircraft was assembled by a team of engineers from NASA's Marshall Space Flight Center. Teams from Johnson Space Center, Kennedy Space Center and Marshall competed in the unmanned aerial systems event to evaluate designs and work by engineers learning new specialties. The competition took place at the Shuttle Landing Facility at Kennedy. Photo credit: NASA/Dmitri Gerondidakis

  13. KSC-2013-3540

    NASA Image and Video Library

    2013-09-11

    CAPE CANAVERAL, Fla. – A remote-controlled aircraft takes off during a competition with a unique set of sensors and software to conduct a mock search-and-rescue operation. The aircraft was assembled by a team of engineers from NASA's Kennedy Space Center. Teams from Johnson Space Center, Kennedy and Marshall Space Flight Center competed in the unmanned aerial systems event to evaluate designs and work by engineers learning new specialties. The competition took place at the Shuttle Landing Facility at Kennedy. Photo credit: NASA/Dmitri Gerondidakis

  14. KSC-2013-3541

    NASA Image and Video Library

    2013-09-11

    CAPE CANAVERAL, Fla. – A remote-controlled aircraft flies during a competition with a unique set of sensors and software to conduct a mock search-and-rescue operation. The aircraft was assembled by a team of engineers from NASA's Kennedy Space Center. Teams from Johnson Space Center, Kennedy and Marshall Space Flight Center competed in the unmanned aerial systems event to evaluate designs and work by engineers learning new specialties. The competition took place at the Shuttle Landing Facility at Kennedy. Photo credit: NASA/Dmitri Gerondidakis

  15. Model collaboration: university library system and rehabilitation research team to advance telepractice knowledge.

    PubMed

    Deliyannides, Timothy S; Gabler, Vanessa

    2012-01-01

    This Publisher's Report describes the collaboration between a university library system's scholarly communication and publishing office and a federally funded research team, the Rehabilitation Engineering Research Center (RERC) on Telerehabilitation. This novel interdisciplinary collaboration engages librarians, information technologists, publishing professionals, clinicians, policy experts, and engineers and has produced a new Open Access journal, International Journal of Telerehabilitation, and a developing, interactive web-based product dedicated to disseminating information about telerehabilitation. Readership statistics are presented for March 1, 2011 - February 29, 2012.

  16. Dr. von Braun With Management Team

    NASA Technical Reports Server (NTRS)

    1961-01-01

    Dr. von Braun is shown in this photograph, which was probably taken in the early 1960s, with members of his management team. Pictured from left to right are, Werner Kuers, Director of the Manufacturing Engineering Division; Dr. Walter Haeussermarn, Director of the Astrionics Division; Dr. William Mrazek, Propulsion and Vehicle Engineering Division; Dr. von Braun; Dieter Grau, Director of the Quality Assurance Division; Dr. Oswald Lange, Director of the Saturn Systems Office; and Erich Neubert , Associate Deputy Director for Research and Development.

  17. Concurrency in product realization

    NASA Astrophysics Data System (ADS)

    Kelly, Michael J.

    1994-03-01

    Technology per se does not provide a competitive advantage. Timely exploitation of technology is what gives the competitive edge, and this demands a major shift in the product development process and management of the industrial enterprise. `Teaming to win' is more than a management theme; it is the disciplined engineering practice that is essential to success in today's global marketplace. Teaming supports the concurrent engineering practices required to integrate the activities of people responsible for product realization through achievement of shorter development cycles, lower costs, and defect-free products.

  18. Sharing Planetary Exploration: The Education and Public Outreach Program for the NASA MESSENGER Mission to Orbit Mercury

    NASA Astrophysics Data System (ADS)

    Solomon, S. C.; Stockman, S.; Chapman, C. R.; Leary, J. C.; McNutt, R. L.

    2003-12-01

    The Education and Public Outreach (EPO) Program of the MESSENGER mission to the planet Mercury, supported by the NASA Discovery Program, is a full partnership between the project's science and engineering teams and a team of professionals from the EPO community. The Challenger Center for Space Science Education (CCSSE) and the Carnegie Academy for Science Education (CASE) are developing sets of MESSENGER Education Modules targeting grade-specific education levels across K-12. These modules are being disseminated through a MESSENGER EPO Website developed at Montana State University, an Educator Fellowship Program managed by CCSSE to train Fellows to conduct educator workshops, additional workshops planned for NASA educators and members of the Minority University - SPace Interdisciplinary Network (MU-SPIN), and existing inner-city science education programs (e.g., the CASE Summer Science Institute in Washington, D.C.). All lessons are mapped to national standards and benchmarks by MESSENGER EPO team members trained by the American Association for the Advancement of Science (AAAS) Project 2061, all involve user input and feedback and quality control by the EPO team, and all are thoroughly screened by members of the project science and engineering teams. At the college level, internships in science and engineering are provided to students at minority institutions through a program managed by MU-SPIN, and additional opportunities for student participation across the country are planned as the mission proceeds. Outreach efforts include radio spots (AAAS), museum displays (National Air and Space Museum), posters and traveling exhibits (CASE), general language books (AAAS), programs targeting underserved communities (AAAS, CCSSE, and MU-SPIN), and a documentary highlighting the scientific and technical challenges involved in exploring Mercury and how the MESSENGER team has been meeting these challenges. As with the educational elements, science and engineering team members are active partners in each of the public outreach efforts. MESSENGER fully leverages other NASA EPO programs, including the Solar System Exploration EPO Forum and the Solar System Ambassadors. The overarching goal of the MESSENGER EPO program is to convey the excitement of planetary exploration to students and the lay public throughout the nation.

  19. Are your engineers talking to one another when they should?

    PubMed

    Sosa, Manuel E; Eppinger, Steven D; Rowles, Craig M

    2007-11-01

    Communication may not be on managers' minds at companies that design complex, highly engineered products, but it should be. When mistakes take place, it's often because product-component teams fail to talk. The consequences can be huge: Ford and Bridgestone Firestone lost billions by not coordinating the design of the Explorer with the design of its tires. The major delays and cost overruns involved in the development of Airbus's A380 "superjumbo"--which most likely led to the CEO's exit--were a result of unforeseen design incompatibilities. To help managers mitigate such problems, the authors present a new application of the design structure matrix, a project management tool that maps the flow of information and its impact on product development. Drawing on research into how Pratt & Whitney handled the development of the PW4098 jet engine, they have developed an approach that uncovers (a) areas where communication should be occurring but is not (unattended interfaces, usually bad) and (b) areas where communication is occurring but has not been planned for (unidentified interfaces, usually good). After finding the unattended and unidentified interfaces, the next step is to figure out the causes of the critical ones. If a significant number of unattended interfaces cross organizational boundaries, executives may need to redraw organizational lines. Executives can then manage the remaining critical interfaces by extending the responsibilities of existing integration teams (those responsible for cross-system aspects, such as a jet engine's fuel economy) to include supervising the interaction, by dedicating teams to specific interfaces, or by formally charging teams already involved with the interfaces to oversee them. Finally, it's important to ensure that the teams are working with compatible design equipment; inconsistencies between CAD tools have cost Airbus dearly.

  20. 44 CFR 65.10 - Mapping of areas protected by levee systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... requirement described in paragraph (b)(1)(i) of this section, may be approved. Appropriate engineering... paragraph (b)(1)(iii) of this section, may be approved. Appropriate engineering analyses demonstrating... are structural parts of the system during operation and design according to sound engineering practice...

  1. KSC-98pc970

    NASA Image and Video Library

    1998-08-20

    In Firing Room 1 at KSC, Shuttle launch team members put the Shuttle system through an integrated simulation. The control room is set up with software used to simulate flight and ground systems in the launch configuration. A Simulation Team, comprised of KSC engineers, introduce 12 or more major problems to prepare the launch team for worst-case scenarios. Such tests and simulations keep the Shuttle launch team sharp and ready for liftoff. The next liftoff is targeted for Oct. 29

  2. Collective Efficacy Beliefs in Student Work Teams: Relation to Self-Efficacy, Cohesion, and Performance

    ERIC Educational Resources Information Center

    Lent, Robert W.; Schmidt, Janet; Schmidt, Linda

    2006-01-01

    A measure of collective efficacy was developed and administered to undergraduates working in project teams in engineering courses. Findings in each of two samples revealed that the measure contained a single factor and was related to ratings of team cohesion and personal efficacy. Collective efficacy was also found to relate to indicators of team…

  3. Marshall Team Recreates Goddard Rocket

    NASA Technical Reports Server (NTRS)

    2003-01-01

    In honor of the Centernial of Flight celebration and commissioned by the American Institute of Aeronautics and Astronautics (AIAA), a team of engineers from Marshall Space Flight Center (MSFC) built a replica of the first liquid-fueled rocket. The original rocket, designed and built by rocket engineering pioneer Robert H. Goddard in 1926, opened the door to modern rocketry. Goddard's rocket reached an altitude of 41 feet while its flight lasted only 2.5 seconds. The Marshall design team's plan was to stay as close as possible to an authentic reconstruction of Goddard's rocket. The same propellants were used - liquid oxygen and gasoline - as available during Goddard's initial testing and firing. The team also tried to construct the replica using the original materials and design to the greatest extent possible. By purposely using less advanced techniques and materials than many that are available today, the team encountered numerous technical challenges in testing the functional hardware. There were no original blueprints or drawings, only photographs and notes. However, this faithful adherence to historical accuracy has also allowed the team to experience many of the same challenges Goddard faced 77 years ago, and more fully appreciate the genius of this extraordinary man. The replica will undergo ground tests at MSFC this summer.

  4. The European Project Semester at ISEP: the challenge of educating global engineers

    NASA Astrophysics Data System (ADS)

    Malheiro, Benedita; Silva, Manuel; Ribeiro, Maria Cristina; Guedes, Pedro; Ferreira, Paulo

    2015-05-01

    Current engineering education challenges require approaches that promote scientific, technical, design and complementary skills while fostering autonomy, innovation and responsibility. The European Project Semester (EPS) at Instituto Superior de Engenharia do Porto (ISEP) (EPS@ISEP) is a one semester project-based learning programme (30 European Credit Transfer Units (ECTU)) for engineering students from diverse scientific backgrounds and nationalities that intends to address these goals. The students, organised in multidisciplinary and multicultural teams, are challenged to solve real multidisciplinary problems during one semester. The EPS package, although on project development (20 ECTU), includes a series of complementary seminars aimed at fostering soft, project-related and engineering transversal skills (10 ECTU). Hence, the students enrolled in this programme improve their transversal skills and learn, together and with the team of supervisors, subjects distinct from their core training. This paper presents the structure, implementation and results of the EPS@ISEP that was created in 2011 to apply the best engineering practices and promote internationalisation and engineering education innovation at ISEP.

  5. Game Imaging Meets Nuclear Reality

    ScienceCinema

    Michel, Kelly; Watkins, Adam

    2018-01-16

    At Los Alamos National Laboratory, a team of artists and animators, nuclear engineers and computer scientists is teaming to provide 3-D models of nuclear facilities to train IAEA safeguards inspectors and others who need fast familiarity with specific nuclear sites.

  6. Epidemiology and location of primary retrieval missions in a Scottish aeromedical service.

    PubMed

    Neagle, Gregg; Curatolo, Lisa; Ferris, John; Donald, Mike; Hearns, Stephen; Corfield, Alasdair R

    2017-07-25

    Prehospital critical care teams comprising an appropriately trained physician and paramedic or nurse have been associated with improved outcomes in selected trauma patients. These teams are a scarce and expensive resource, especially when delivered by rotary air assets. The optimal tasking of prehospital critical care teams is therefore vital and remains a subject of debate. Emergency Medical Retrieval Service (EMRS) provides a prehospital critical care response team to incidents over a large area of Scotland either by air or by road. A convenience sample of consecutive EMRS missions covering a period of 18 months from May 2013 to January 2015 was taken. These missions were matched with the ambulance service information on geographical location of the incident. In order to assess the appropriateness of tasking, interventions undertaken on each mission were analysed and divided into two subcategories: 'critical care interventions' and 'advanced medical interventions'. A tasking was deemed appropriate if it included either category of intervention or if a patient was pronounced life extinct at the scene. A total of 1279 primary missions were undertaken during the study period. Of these, 493 primary missions met the inclusion criteria and generated complete location data. The median distance to scene was calculated as 5.6 miles for land responses and 34.2 miles for air responses. Overall, critical care interventions were performed on 17% (84/493) of patients. A further 21% (102/493) of patients had an advanced medical intervention. Including those patients for whom life was pronounced extinct on scene by the EMRS team, a total of 42% (206/493) taskings were appropriate. Overall, our data show a wide geographical spread of tasking for our service, which is in keeping with other suburban/rural models of prehospital care. Tasking accuracy is also comparable to the accuracy shown by other similar services.

  7. KSC-99pp0281

    NASA Image and Video Library

    1999-03-06

    At the start of the award ceremony at the 1999 FIRST Southeastern Regional robotic competition held at KSC, judges, including Deputy Director for Launch and Payload Processing Loren Shriver (left), give "high fives" to a winning team from Minnesota as they enter. FIRST is a nonprofit organization, For Inspiration and Recognition of Science and Technology, that sponsors the event pitting gladiator robots against each other in an athletic-style competition. The FIRST robotics competition is designed to provide students with a hands-on, inside look at engineering and other professional careers, pairing high school students with engineer mentors and corporations. The regional event comprised 27 teams. Along with the championship award, which went to high school teams in Miami and San German, Puerto Rico, 15 other awards were presented

  8. Software Engineering for Scientific Computer Simulations

    NASA Astrophysics Data System (ADS)

    Post, Douglass E.; Henderson, Dale B.; Kendall, Richard P.; Whitney, Earl M.

    2004-11-01

    Computer simulation is becoming a very powerful tool for analyzing and predicting the performance of fusion experiments. Simulation efforts are evolving from including only a few effects to many effects, from small teams with a few people to large teams, and from workstations and small processor count parallel computers to massively parallel platforms. Successfully making this transition requires attention to software engineering issues. We report on the conclusions drawn from a number of case studies of large scale scientific computing projects within DOE, academia and the DoD. The major lessons learned include attention to sound project management including setting reasonable and achievable requirements, building a good code team, enforcing customer focus, carrying out verification and validation and selecting the optimum computational mathematics approaches.

  9. The Widest Practicable Dissemination: The NASA Technical Report Server

    NASA Technical Reports Server (NTRS)

    Nelson, Michael L.; Gottlich, Gretchen L.; Bianco, David J.; Binkley, Robert L.; Kellogg, Yvonne D.; Paulson, Sharon S.; Beaumont, Chris J.; Schmunk, Robert B.; Kurtz, Michael J.; Accomazzi, Alberto

    1995-01-01

    The National Aeronautics and Space Act of 1958 established NASA and charged it to "provide for the widest practicable and appropriate dissemination of information concerning [...] its activities and the results thereof." The search for innovative methods to distribute NASA s information lead a grass-roots team to create the NASA Technical Report Server (NTRS), which uses the World Wide Web and other popular Internet-based information systems as search engines. The NTRS is an inter-center effort which provides uniform access to various distributed publication servers residing on the Internet. Users have immediate desktop access to technical publications from NASA centers and institutes. The NTRS is comprised of several units, some constructed especially for inclusion in NTRS, and others that are existing NASA publication services that NTRS reuses. This paper presents the NTRS architecture, usage metrics, and the lessons learned while implementing and maintaining the services over the initial 6-month period. The NTRS is largely constructed with freely available software running on existing hardware. NTRS builds upon existing hardware and software, and the resulting additional exposure for the body of literature contained will allow NASA to ensure that its institutional knowledge base will continue to receive the widest practicable and appropriate dissemination.

  10. The widest practicable dissemination: The NASA technical report server

    NASA Technical Reports Server (NTRS)

    Nelson, Michael L.; Gottlich, Gretchen L.; Bianco, David J.; Binkley, Robert L.; Kellogg, Yvonne D.; Paulson, Sharon S.; Beaumont, Chris J.; Schmunk, Robert B.; Kurtz, Michael J.; Accomazzi, Alberto

    1995-01-01

    The National Aeronautics and Space Act of 1958 established NASA and charged it to 'provide for the widest practicable and appropriate dissemination of information concerning...its activities and the results thereof.' The search for innovative methods to distribute NASA's information lead a grass-roots team to create the NASA Technical Report Server (NTRS), which uses the World Wide Web and other popular Internet-based information systems as search engines. The NTRS is an inter-center effort which provides uniform access to various distributed publication servers residing on the Internet. Users have immediate desktop access to technical publications from NASA centers and institutes. The NTRS is comprised of several units, some constructed especially for inclusion in NTRS, and others that are existing NASA publication services that NTRS reuses. This paper presents the NTRS architecture, usage metrics, and the lessons learned while implementing and maintaining the services over the initial six-month period. The NTRS is largely constructed with freely available software running on existing hardware. NTRS builds upon existing hardware and software, and the resulting additional exposure for the body of literature contained will allow NASA to ensure that its institutional knowledge base will continue to receive the widest practicable and appropriate dissemination.

  11. Integrating International Engineering Organizations For Successful ISS Operations

    NASA Technical Reports Server (NTRS)

    Blome, Elizabeth; Duggan, Matt; Patten, L.; Pieterek, Hhtrud

    2006-01-01

    The International Space Station (ISS) is a multinational orbiting space laboratory that is built in cooperation with 16 nations. The design and sustaining engineering expertise is spread worldwide. As the number of Partners with orbiting elements on the ISS grows, the challenge NASA is facing as the ISS integrator is to ensure that engineering expertise and data are accessible in a timely fashion to ensure ongoing operations and mission success. Integrating international engineering teams requires definition and agreement on common processes and responsibilities, joint training and the emergence of a unique engineering team culture. ISS engineers face daunting logistical and political challenges regarding data sharing requirements. To assure systematic information sharing and anomaly resolution of integrated anomalies, the ISS Partners are developing multi-lateral engineering interface procedures. Data sharing and individual responsibility are key aspects of this plan. This paper describes several examples of successful multilateral anomaly resolution. These successes were used to form the framework of the Partner to Partner engineering interface procedures, and this paper describes those currently documented multilateral engineering processes. Furthermore, it addresses the challenges experienced to date, and the forward work expected in establishing a successful working relationship with Partners as their hardware is launched.

  12. Promoting human subjects training for place-based communities and cultural groups in environmental research: curriculum approaches for graduate student/faculty training.

    PubMed

    Quigley, Dianne

    2015-02-01

    A collaborative team of environmental sociologists, community psychologists, religious studies scholars, environmental studies/science researchers and engineers has been working together to design and implement new training in research ethics, culture and community-based approaches for place-based communities and cultural groups. The training is designed for short and semester-long graduate courses at several universities in the northeastern US. The team received a 3 year grant from the US National Science Foundation's Ethics Education in Science and Engineering in 2010. This manuscript details the curriculum topics developed that incorporate ethical principles, particularly for group protections/benefits within the field practices of environmental/engineering researchers.

  13. Managing MDO Software Development Projects

    NASA Technical Reports Server (NTRS)

    Townsend, J. C.; Salas, A. O.

    2002-01-01

    Over the past decade, the NASA Langley Research Center developed a series of 'grand challenge' applications demonstrating the use of parallel and distributed computation and multidisciplinary design optimization. All but the last of these applications were focused on the high-speed civil transport vehicle; the final application focused on reusable launch vehicles. Teams of discipline experts developed these multidisciplinary applications by integrating legacy engineering analysis codes. As teams became larger and the application development became more complex with increasing levels of fidelity and numbers of disciplines, the need for applying software engineering practices became evident. This paper briefly introduces the application projects and then describes the approaches taken in project management and software engineering for each project; lessons learned are highlighted.

  14. Team-Based Programs: The EMP. An Industry/University Partnership-The Educational Model for the 21st Century.

    ERIC Educational Resources Information Center

    Haynes, Ray; And Others

    California Polytechnic State University's College of Business and College of Engineering have joined forces to create a joint Engineering Management Program (EMP). Students holding undergraduate engineering or equivalent degrees enter and earn both Masters in Business Administration and Masters of Science in Engineering in 24 months. The program…

  15. A Project-Based Engineering and Leadership Workshop for High School Students

    ERIC Educational Resources Information Center

    Ryder, Linda Sue; Pegg, Jerine; Wood, Nathan

    2012-01-01

    Summer outreach programs provide pre-college participants an introduction to college life and exposure to engineering in an effort to raise the level of interest and bring more students into engineering fields. The Junior Engineering, Mathematics, and Science (JEMS) program is a project-based summer workshop in which teams of high school students…

  16. They Can't Spell "Engineering" but They Can Do It: Designing an Engineering Curriculum for the Preschool Classroom

    ERIC Educational Resources Information Center

    Davis, Martha E.; Cunningham, Christine M.; Lachapelle, Cathy P.

    2017-01-01

    Engineering is Elementary (EiE) is a curriculum project of the Museum of Science, Boston, that promotes and supports engineering literacy and educational equity for all children. Building on the success of its award-winning curriculum for grades 1-5, the team has recently turned its attention to Wee Engineer, a research-based engineering…

  17. Women’s Work: Incorporating Females into the United States Military Strategy to Contain and Degrade Boko Haram

    DTIC Science & Technology

    2017-06-09

    Facilities, Policies FET Female Engagement Team FINER Feasible, Interesting, Novel, Ethical and Relevant MNJTF Multinational Joint Task Force NMS...Engagement Team: All volunteer female team of appropriate rank, experience, and maturity whose mission is to engage with female members of a community ...incredibly successful and led to the U.S. Military’s recognition of the importance of establishing trust and communication with the female populations

  18. Life Sciences Centrifuge Facility review

    NASA Technical Reports Server (NTRS)

    Young, Laurence R.

    1994-01-01

    The Centrifuge Facility Project at ARC was reviewed by a code U team to determine appropriateness adequacy for the ISSA. This report represents the findings of one consultant to this team and concentrates on scientific and technical risks. This report supports continuation of the project to the next phase of development.

  19. The Georgetown Adolescent Intervention Team: Tri-State Technical Assistance and Training Project.

    ERIC Educational Resources Information Center

    Georgetown Univ., Washington, DC.

    Described is the program of the Georgetown Adolescent Intervention Team (Washington, D.C.), which provides interdisciplinary evaluations and diagnoses, and identifies appropriate alternative placements for developmentally disabled juvenile offenders (10-16 years old and older). The program is discussed in terms of a review of procedures for…

  20. Application of an engineering problem-solving methodology to address persistent problems in patient safety: a case study on retained surgical sponges after surgery.

    PubMed

    Anderson, Devon E; Watts, Bradley V

    2013-09-01

    Despite innumerable attempts to eliminate the postoperative retention of surgical sponges, the medical error persists in operating rooms worldwide and places significant burden on patient safety, quality of care, financial resources, and hospital/physician reputation. The failure of countless solutions, from new sponge counting methods to radio labeled sponges, to truly eliminate the event in the operating room requires that the emerging field of health-care delivery science find innovative ways to approach the problem. Accordingly, the VA National Center for Patient Safety formed a unique collaboration with a team at the Thayer School of Engineering at Dartmouth College to evaluate the retention of surgical sponges after surgery and find a solution. The team used an engineering problem solving methodology to develop the best solution. To make the operating room a safe environment for patients, the team identified a need to make the sponge itself safe for use as opposed to resolving the relatively innocuous counting methods. In evaluation of this case study, the need for systematic engineering evaluation to resolve problems in health-care delivery becomes clear.

  1. A new DoD initiative: the Computational Research and Engineering Acquisition Tools and Environments (CREATE) program

    NASA Astrophysics Data System (ADS)

    Arevalo, S.; Atwood, C.; Bell, P.; Blacker, T. D.; Dey, S.; Fisher, D.; Fisher, D. A.; Genalis, P.; Gorski, J.; Harris, A.; Hill, K.; Hurwitz, M.; Kendall, R. P.; Meakin, R. L.; Morton, S.; Moyer, E. T.; Post, D. E.; Strawn, R.; Veldhuizen, D. v.; Votta, L. G.; Wynn, S.; Zelinski, G.

    2008-07-01

    In FY2008, the U.S. Department of Defense (DoD) initiated the Computational Research and Engineering Acquisition Tools and Environments (CREATE) program, a 360M program with a two-year planning phase and a ten-year execution phase. CREATE will develop and deploy three computational engineering tool sets for DoD acquisition programs to use to design aircraft, ships and radio-frequency antennas. The planning and execution of CREATE are based on the 'lessons learned' from case studies of large-scale computational science and engineering projects. The case studies stress the importance of a stable, close-knit development team; a focus on customer needs and requirements; verification and validation; flexible and agile planning, management, and development processes; risk management; realistic schedules and resource levels; balanced short- and long-term goals and deliverables; and stable, long-term support by the program sponsor. Since it began in FY2008, the CREATE program has built a team and project structure, developed requirements and begun validating them, identified candidate products, established initial connections with the acquisition programs, begun detailed project planning and development, and generated the initial collaboration infrastructure necessary for success by its multi-institutional, multidisciplinary teams.

  2. Analyzing Team Based Engineering Design Process in Computer Supported Collaborative Learning

    ERIC Educational Resources Information Center

    Lee, Dong-Kuk; Lee, Eun-Sang

    2016-01-01

    The engineering design process has been largely implemented in a collaborative project format. Recently, technological advancement has helped collaborative problem solving processes such as engineering design to have efficient implementation using computers or online technology. In this study, we investigated college students' interaction and…

  3. [Multiprofessional team working in palliative medicine].

    PubMed

    Osaka, Iwao

    2013-04-01

    Now, more than ever, palliative medicine has been gaining recognition for its essential role in cancer treatment. Since its beginning, it has emphasized the importance of collaboration among multidisciplinary professionals, valuing a comprehensive and holistic philosophy, addressing a wide range of hopes and suffering that patients and families experience. There are three models (approaches) for the medical teams: multidisciplinary, interdisciplinary, and transdisciplinary. Palliative care teams often choose the interdisciplinary team model, and the teams in the palliative care units may often choose the transdisciplinary team model. Recently, accumulating research has shown the clinical benefits of the interdisciplinary/transdisciplinary approach in palliative care settings. Clarifying appropriate functions and ideal features of physicians in the health care team, and enforcing the suitable team approach will contribute to improve the quality of whole medical practice beyond the framework of "palliative medicine".

  4. The hemodialysis patient: object of diagnosis or part of the treatment team?

    PubMed

    Burnell, M S

    1997-04-01

    Through multidisciplinary diagnosis, the end-stage renal disease (ESRD) treatment team defines the patients's problems and sets goals to reach positive outcomes. Each of the team members has a voice in recommending strategies to reach these goals, because each has been trained in appropriate treatment objectives. Patient noncompliance (nonadherence) with team recommendations can be a major, ongoing problem for the team. The untrained, unhealthy, and often unconsulted amateur member of the team is the patient who is asked to carry out the team plan. Where is the patient's place on the team? There is no doubt that the patient can enhance the planning and development of the treatment objectives. But is the patient's presence seen as a hindrance to planning? More consideration needs to be given to this ongoing issue in an effort to achieve successful patient-oriented outcomes.

  5. Combustion devices technology team - An overview and status of STME-related activities

    NASA Technical Reports Server (NTRS)

    Tucker, P. K.; Croteau-Gillespie, Margie

    1992-01-01

    The Consortium for CFD applications in propulsion technology has been formed at NASA/Marshall Space Flight Center. The combustion devices technology team is one of the three teams that constitute the Consortium. While generally aiming to advance combustion devices technology for rocket propulsion, the team's efforts for the last 1 and 1/2 years have been focused on issues relating to the Space Transportation Main Engine (STME) nozzle. The nozzle design uses hydrogen-rich turbine exhaust to cool the wall in a film/dump scheme. This method of cooling presents challenges and associated risks for the nozzle designers and the engine/vehicle integrators. Within the nozzle itself, a key concern is the ability to effectively and efficiently film cool the wall. From the National Launch System vehicle base standpoint, there are concerns with dumping combustible gases at the nozzle exit and their potential adverse effects on the base thermal environment. The Combustion Team has developed and is implementing plans to use validated CFD tools to aid in risk mitigation for both areas.

  6. Beyond Robotics

    ERIC Educational Resources Information Center

    Tally, Beth; Laverdure, Nate

    2006-01-01

    Chantilly High School Academy Robotics Team Number 612 from Chantilly, Virginia, is an award-winning team of high school students actively involved with FIRST (For Inspiration and Recognition of Science and Technology), a multinational nonprofit organization that inspires students to transform culture--making science, math, engineering and…

  7. Model-Based Systems Engineering in Concurrent Engineering Centers

    NASA Technical Reports Server (NTRS)

    Iwata, Curtis; Infeld, Samantha; Bracken, Jennifer Medlin; McGuire; McQuirk, Christina; Kisdi, Aron; Murphy, Jonathan; Cole, Bjorn; Zarifian, Pezhman

    2015-01-01

    Concurrent Engineering Centers (CECs) are specialized facilities with a goal of generating and maturing engineering designs by enabling rapid design iterations. This is accomplished by co-locating a team of experts (either physically or virtually) in a room with a focused design goal and a limited timeline of a week or less. The systems engineer uses a model of the system to capture the relevant interfaces and manage the overall architecture. A single model that integrates other design information and modeling allows the entire team to visualize the concurrent activity and identify conflicts more efficiently, potentially resulting in a systems model that will continue to be used throughout the project lifecycle. Performing systems engineering using such a system model is the definition of model-based systems engineering (MBSE); therefore, CECs evolving their approach to incorporate advances in MBSE are more successful in reducing time and cost needed to meet study goals. This paper surveys space mission CECs that are in the middle of this evolution, and the authors share their experiences in order to promote discussion within the community.

  8. Model-Based Systems Engineering in Concurrent Engineering Centers

    NASA Technical Reports Server (NTRS)

    Iwata, Curtis; Infeld, Samatha; Bracken, Jennifer Medlin; McGuire, Melissa; McQuirk, Christina; Kisdi, Aron; Murphy, Jonathan; Cole, Bjorn; Zarifian, Pezhman

    2015-01-01

    Concurrent Engineering Centers (CECs) are specialized facilities with a goal of generating and maturing engineering designs by enabling rapid design iterations. This is accomplished by co-locating a team of experts (either physically or virtually) in a room with a narrow design goal and a limited timeline of a week or less. The systems engineer uses a model of the system to capture the relevant interfaces and manage the overall architecture. A single model that integrates other design information and modeling allows the entire team to visualize the concurrent activity and identify conflicts more efficiently, potentially resulting in a systems model that will continue to be used throughout the project lifecycle. Performing systems engineering using such a system model is the definition of model-based systems engineering (MBSE); therefore, CECs evolving their approach to incorporate advances in MBSE are more successful in reducing time and cost needed to meet study goals. This paper surveys space mission CECs that are in the middle of this evolution, and the authors share their experiences in order to promote discussion within the community.

  9. KSC-98pc969

    NASA Image and Video Library

    1998-08-19

    KENNEDY SPACE CENTER, FLA. -- In Firing Room 1 at KSC, Shuttle launch team members put the Shuttle system through an integrated simulation. The control room is set up with software used to simulate flight and ground systems in the launch configuration. A Simulation Team, comprisING KSC engineers, introduce 12 or more major problems to prepare the launch team for worst-case scenarios. Such tests and simulations keep the Shuttle launch team sharp and ready for liftoff. The next liftoff is targeted for Oct. 29.

  10. KSC-98pc971

    NASA Image and Video Library

    1998-08-20

    KENNEDY SPACE CENTER, FLA. -- In Firing Room 1 at KSC, Shuttle launch team members put the Shuttle system through an integrated simulation. The control room is set up with software used to simulate flight and ground systems in the launch configuration. A Simulation Team, comprising KSC engineers, introduce 12 or more major problems to prepare the launch team for worst-case scenarios. Such tests and simulations keep the Shuttle launch team sharp and ready for liftoff. The next liftoff is targeted for Oct. 29

  11. Materials Test Branch

    NASA Technical Reports Server (NTRS)

    Gordon, Gail

    2012-01-01

    The Materials Test Branch resides at Marshall Space Flight Center's Materials and Processing laboratory and has a long history of supporting NASA programs from Mercury to the recently retired Space Shuttle. The Materials Test Branch supports its customers by supplying materials testing expertise in a wide range of applications. The Materials Test Branch is divided into three Teams, The Chemistry Team, The Tribology Team and the Mechanical Test Team. Our mission and goal is to provide world-class engineering excellence in materials testing with a special emphasis on customer service.

  12. Student Drop Tower Competitions: Dropping In a Microgravity Environment (DIME) and What If No Gravity? (WING)

    NASA Technical Reports Server (NTRS)

    Hall, Nancy R.; Stocker, Dennis P.; DeLombard, Richard

    2011-01-01

    This paper describes two student competition programs that allow student teams to conceive a science or engineering experiment for a microgravity environment. Selected teams design and build their experimental hardware, conduct baseline tests, and ship their experiment to NASA where it is operated in the 2.2 Second Drop Tower. The hardware and acquired data is provided to the teams after the tests are conducted so that the teams can prepare their final reports about their findings.

  13. Applications of aerospace technology in biology and medicine

    NASA Technical Reports Server (NTRS)

    Brown, J. N.

    1974-01-01

    The results of the medically related activities of the NASA Application Team Program at the Research Triangle Institute are presented. The RTI team, a multidisciplinary team of scientists and engineers, acted as an information and technology interface between NASA and individuals, institutions, and agencies involved in biomedical research and clinical medicine. The Team has identified 40 new problems for investigation, has accomplished 7 technology applications, 6 potential technology application, 4 impacts, has closed 54 old problems, and has a total of 47 problems under active investigation.

  14. Strategies for Information Retrieval and Virtual Teaming to Mitigate Risk on NASA's Missions

    NASA Technical Reports Server (NTRS)

    Topousis, Daria; Williams, Gregory; Murphy, Keri

    2007-01-01

    Following the loss of NASA's Space Shuttle Columbia in 2003, it was determined that problems in the agency's organization created an environment that led to the accident. One component of the proposed solution resulted in the formation of the NASA Engineering Network (NEN), a suite of information retrieval and knowledge sharing tools. This paper describes the implementation of this set of search, portal, content management, and semantic technologies, including a unique meta search capability for data from distributed engineering resources. NEN's communities of practice are formed along engineering disciplines where users leverage their knowledge and best practices to collaborate and take informal learning back to their personal jobs and embed it into the procedures of the agency. These results offer insight into using traditional engineering disciplines for virtual teaming and problem solving.

  15. Towards a balanced software team formation based on Belbin team role using fuzzy technique

    NASA Astrophysics Data System (ADS)

    Omar, Mazni; Hasan, Bikhtiyar; Ahmad, Mazida; Yasin, Azman; Baharom, Fauziah; Mohd, Haslina; Darus, Norida Muhd

    2016-08-01

    In software engineering (SE), team roles play significant impact in determining the project success. To ensure the optimal outcome of the project the team is working on, it is essential to ensure that the team members are assigned to the right role with the right characteristics. One of the prevalent team roles is Belbin team role. A successful team must have a balance of team roles. Thus, this study demonstrates steps taken to determine balance of software team formation based on Belbin team role using fuzzy technique. Fuzzy technique was chosen because it allows analyzing of imprecise data and classifying selected criteria. In this study, two roles in Belbin team role, which are Shaper (Sh) and Plant (Pl) were chosen to assign the specific role in software team. Results show that the technique is able to be used for determining the balance of team roles. Future works will focus on the validation of the proposed method by using empirical data in industrial setting.

  16. Developing Teaching of Mathematics to First Year Engineering Students

    ERIC Educational Resources Information Center

    Jaworski, Barbara; Matthews, Janette

    2011-01-01

    Engineering Students Understanding Mathematics (ESUM) is a developmental research project at a UK university. The motivating aim is that engineering students should develop a more conceptual understanding of mathematics through their participation in an innovation in teaching. A small research team has both studied and contributed to innovation,…

  17. Integrating Innovation Skills in an Introductory Engineering Design-Build Course

    ERIC Educational Resources Information Center

    Liebenberg, Leon; Mathews, Edward Henry

    2012-01-01

    Modern engineering curricula have started to emphasize design, mostly in the form of design-build experiences. Apart from instilling important problem-solving skills, such pedagogical frameworks address the critical social skill aspects of engineering education due to their team-based, project-based nature. However, it is required of the…

  18. STS-114 Mission Management Team Meeting

    NASA Image and Video Library

    2005-08-04

    JSC2005-E-32012 (4 August 2005) --- John Muratore, Manager of Space Shuttle Systems Engineering & Integration Office, discusses a key STS-114 issue during the Mission Management Team (MMT) session of the afternoon of August 4. The MMT meets daily in Houston's Mission Control Center.

  19. Performance of Charcoal Cookstoves for Haiti Part 1: Results from the Water Boiling Test

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Booker, Kayje; Han, Tae Won; Granderson, Jessica

    2011-06-01

    In April 2010, a team of scientists and engineers from Lawrence Berkeley National Lab (LBNL) and UC Berkeley, with support from the Darfur Stoves Project (DSP), undertook a fact-finding mission to Haiti in order to assess needs and opportunities for cookstove intervention. Based on data collected from informal interviews with Haitians and NGOs, the team, Scott Sadlon, Robert Cheng, and Kayje Booker, identified and recommended stove testing and comparison as a high priority need that could be filled by LBNL. In response to that recommendation, five charcoal stoves were tested at the LBNL stove testing facility using a modified formmore » of version 3 of the Shell Foundation Household Energy Project Water Boiling Test (WBT). The original protocol is available online. Stoves were tested for time to boil, thermal efficiency, specific fuel consumption, and emissions of CO, CO{sub 2}, and the ratio of CO/CO{sub 2}. In addition, Haitian user feedback and field observations over a subset of the stoves were combined with the experiences of the laboratory testing technicians to evaluate the usability of the stoves and their appropriateness for Haitian cooking. The laboratory results from emissions and efficiency testing and conclusions regarding usability of the stoves are presented in this report.« less

  20. Effect of obstetric team training on team performance and medical technical skills: a randomised controlled trial.

    PubMed

    Fransen, A F; van de Ven, J; Merién, A E R; de Wit-Zuurendonk, L D; Houterman, S; Mol, B W; Oei, S G

    2012-10-01

    To determine whether obstetric team training in a medical simulation centre improves the team performance and utilisation of appropriate medical technical skills of healthcare professionals. Cluster randomised controlled trial. The Netherlands. The obstetric departments of 24 Dutch hospitals. The obstetric departments were randomly assigned to a 1-day session of multiprofessional team training in a medical simulation centre or to no such training. Team training was given with high-fidelity mannequins by an obstetrician and a communication expert. More than 6 months following training, two unannounced simulated scenarios were carried out in the delivery rooms of all 24 obstetric departments. The scenarios, comprising a case of shoulder dystocia and a case of amniotic fluid embolism, were videotaped. The team performance and utilisation of appropriate medical skills were evaluated by two independent experts. Team performance evaluated with the validated Clinical Teamwork Scale (CTS) and the employment of two specific obstetric procedures for the two clinical scenarios in the simulation (delivery of the baby with shoulder dystocia in the maternal all-fours position and conducting a perimortem caesarean section within 5 minutes for the scenario of amniotic fluid embolism). Seventy-four obstetric teams from 12 hospitals in the intervention group underwent teamwork training between November 2009 and July 2010. The teamwork performance in the training group was significantly better in comparison to the nontraining group (median CTS score: 7.5 versus 6.0, respectively; P = 0.014). The use of the predefined obstetric procedures for the two clinical scenarios was also significantly more frequent in the training group compared with the nontraining group (83 versus 46%, respectively; P = 0.009). Team performance and medical technical skills may be significantly improved after multiprofessional obstetric team training in a medical simulation centre. © 2012 The Authors BJOG An International Journal of Obstetrics and Gynaecology © 2012 RCOG.

  1. Engineering Science--Raising Awareness of Engineering through Key Stage 3 (Age 11-14) Science

    ERIC Educational Resources Information Center

    Mannion, Ken

    2012-01-01

    During 2011, a team from the Centre for Science Education (CSE) worked with four local schools and five Sheffield city region engineering organisations on a project to identify ways to increase the input into young people's awareness of engineering that comes from activities they do in school science. The project also tested an hypothesis that…

  2. Evaluation of Flowable Fill Surface Performance

    DTIC Science & Technology

    2016-11-01

    Army position unless so designated by other authorized documents. DESTROY THIS REPORT WHEN NO LONGER NEEDED. DO NOT RETURN IT TO THE ORIGINATOR...33 viii Preface This study was conducted for the U.S. Air Force’s (USAF) pavement evaluation teams, contingency readiness groups, base civil...engineers, major command pavement engineers, Rapid Engineer Deployable Heavy Operational Repair Squadron Engineer (RED HORSE) squadrons, and Prime Base

  3. Recipe for Success: Digital Viewables

    NASA Technical Reports Server (NTRS)

    LaPha, Steven; Gaydos, Frank

    2014-01-01

    The Engineering Services Contract (ESC) and Information Management Communication Support contract (IMCS) at Kennedy Space Center (KSC) provide services to NASA in respect to flight and ground systems design and development. These groups provides the necessary tools, aid, and best practice methodologies required for efficient, optimized design and process development. The team is responsible for configuring and implementing systems, software, along with training, documentation, and administering standards. The team supports over 200 engineers and design specialists with the use of Windchill, Creo Parametric, NX, AutoCAD, and a variety of other design and analysis tools.

  4. The widest practicable dissemination: The NASA technical report server

    NASA Technical Reports Server (NTRS)

    Nelson, Michael L.; Gottlich, Gretchen L.; Bianco, David J.; Binkley, Robert L.; Kellogg, Yvonne D.; Paulson, Sharon S.; Beaumont, Chris J.; Schmunk, Robert B.; Kurtz, Michael; Accomazzi, Alberto

    1995-01-01

    The search for innovative methods to distribute NASA's information lead a gross-roots team to create the NASA Technical Report Server (NTRS), which uses the World Wide Web and other popular Internet-based information systems as search engines. The NTRS is an inter-center effort which provides uniform access to various distributed publication servers residing on the Internet. Users have immediate desktop access to technical publications from NASA centers and institutes. This paper presents the NTRS architecture, usage metrics, and the lessons learned while implementing and maintaining the services over the initial 6-month period. The NTRS is largely constructed with freely available software running on existing hardware. NTRS builds upon existing hardware and software, and the resulting additional exposure for the body of literature contained will allow NASA to ensure that its institutional knowledge base will continue to receive the widest practicable and appropriate dissemination.

  5. Advanced technology for future regional transport aircraft

    NASA Technical Reports Server (NTRS)

    Williams, L. J.

    1982-01-01

    In connection with a request for a report coming from a U.S. Senate committee, NASA formed a Small Transport Aircraft Technology (STAT) team in 1978. STAT was to obtain information concerning the technical improvements in commuter aircraft that would likely increase their public acceptance. Another area of study was related to questions regarding the help which could be provided by NASA's aeronautical research and development program to commuter aircraft manufacturers with respect to the solution of technical problems. Attention is given to commuter airline growth, current commuter/region aircraft and new aircraft in development, prospects for advanced technology commuter/regional transports, and potential benefits of advanced technology. A list is provided of a number of particular advances appropriate to small transport aircraft, taking into account small gas turbine engine component technology, propeller technology, three-dimensional wing-design technology, airframe aerodynamics/propulsion integration, and composite structure materials.

  6. Open Vehicle Sketch Pad Aircraft Modeling Strategies

    NASA Technical Reports Server (NTRS)

    Hahn, Andrew S.

    2013-01-01

    Geometric modeling of aircraft during the Conceptual design phase is very different from that needed for the Preliminary or Detailed design phases. The Conceptual design phase is characterized by the rapid, multi-disciplinary analysis of many design variables by a small engineering team. The designer must walk a line between fidelity and productivity, picking tools and methods with the appropriate balance of characteristics to achieve the goals of the study, while staying within the available resources. Identifying geometric details that are important, and those that are not, is critical to making modeling and methodology choices. This is true for both the low-order analysis methods traditionally used in Conceptual design as well as the highest-order analyses available. This paper will highlight some of Conceptual design's characteristics that drive the designer s choices as well as modeling examples for several aircraft configurations using the open source version of the Vehicle Sketch Pad (Open VSP) aircraft Conceptual design geometry modeler.

  7. Project Management Software for Distributed Industrial Companies

    NASA Astrophysics Data System (ADS)

    Dobrojević, M.; Medjo, B.; Rakin, M.; Sedmak, A.

    This paper gives an overview of the development of a new software solution for project management, intended mainly to use in industrial environment. The main concern of the proposed solution is application in everyday engineering practice in various, mainly distributed industrial companies. Having this in mind, special care has been devoted to development of appropriate tools for tracking, storing and analysis of the information about the project, and in-time delivering to the right team members or other responsible persons. The proposed solution is Internet-based and uses LAMP/WAMP (Linux or Windows - Apache - MySQL - PHP) platform, because of its stability, versatility, open source technology and simple maintenance. Modular structure of the software makes it easy for customization according to client specific needs, with a very short implementation period. Its main advantages are simple usage, quick implementation, easy system maintenance, short training and only basic computer skills needed for operators.

  8. Investigation of a “Sharps” Incident

    DOE PAGES

    Cournoyer, Michael Edward; Trujillo, Stanley; Schreiber, Stephen Bruce

    2016-08-03

    Special nuclear material research, process development, technology demonstration, and manufacturing capabilities are provided at the Los Alamos National Laboratory Plutonium Facility. Engineered barriers provide the most effective protection from radioactive and hazardous materials. The Worker Safety Security Team augments these passive safety feature by investigating incidents to identify appropriate prevention and mitigation measures. “Learning Teams” facilitate employee feedback loop and integration toward process improvement. Here, this article reports an investigation of a “Sharps” incident and reviews a case study of a technician that cuts his left thumb while making a gasket. Causal analysis of the sharps incident uncovered contributing factorsmore » that created the environment in which the incident occurred. Finally, latent organizational conditions that created error-likely situations or weakened defenses were identified and controlled. Effective improvements that reduce the probability or consequence of similar sharps incidents were implemented.« less

  9. Corporate ergonomics programme at Ford Motor Company.

    PubMed

    Joseph, Bradley S

    2003-01-01

    The use of ergonomic principles in automobile assembly and manufacturing operations has become an important part of a comprehensive health and safety process as well as an integral part of the engineering systems. Ford Motor Company has developed an ergonomics process to manage issues related to injury and illness (e.g., musculoskeletal diseases) and to ensure the appropriate use of human resources on the plant floor. The ergonomics programme uses joint labour and management teams to identify and evaluate jobs and develop and implement solutions. This paper summarises the efforts of the Ford Motor Company in implementing and maintaining the programme. Key strategies are outlined that provide important links to internal organisational units that are critical to fully utilise the ergonomics process. In addition, the paper outlines differences between proactive and reactive efforts and shows the importance of using the information generated by the initiatives for process improvement.

  10. Technology as Teammate: Examining the Role of External Cognition in Support of Team Cognitive Processes

    PubMed Central

    Fiore, Stephen M.; Wiltshire, Travis J.

    2016-01-01

    In this paper we advance team theory by describing how cognition occurs across the distribution of members and the artifacts and technology that support their efforts. We draw from complementary theorizing coming out of cognitive engineering and cognitive science that views forms of cognition as external and extended and integrate this with theorizing on macrocognition in teams. Two frameworks are described that provide the groundwork for advancing theory and aid in the development of more precise measures for understanding team cognition via focus on artifacts and the technologies supporting their development and use. This includes distinctions between teamwork and taskwork and the notion of general and specific competencies from the organizational sciences along with the concepts of offloading and scaffolding from the cognitive sciences. This paper contributes to the team cognition literature along multiple lines. First, it aids theory development by synthesizing a broad set of perspectives on the varied forms of cognition emerging in complex collaborative contexts. Second, it supports research by providing diagnostic guidelines to study how artifacts are related to team cognition. Finally, it supports information systems designers by more precisely describing how to conceptualize team-supporting technology and artifacts. As such, it provides a means to more richly understand process and performance as it occurs within sociotechnical systems. Our overarching objective is to show how team cognition can both be more clearly conceptualized and more precisely measured by integrating theory from cognitive engineering and the cognitive and organizational sciences. PMID:27774074

  11. Technology as Teammate: Examining the Role of External Cognition in Support of Team Cognitive Processes.

    PubMed

    Fiore, Stephen M; Wiltshire, Travis J

    2016-01-01

    In this paper we advance team theory by describing how cognition occurs across the distribution of members and the artifacts and technology that support their efforts. We draw from complementary theorizing coming out of cognitive engineering and cognitive science that views forms of cognition as external and extended and integrate this with theorizing on macrocognition in teams. Two frameworks are described that provide the groundwork for advancing theory and aid in the development of more precise measures for understanding team cognition via focus on artifacts and the technologies supporting their development and use. This includes distinctions between teamwork and taskwork and the notion of general and specific competencies from the organizational sciences along with the concepts of offloading and scaffolding from the cognitive sciences. This paper contributes to the team cognition literature along multiple lines. First, it aids theory development by synthesizing a broad set of perspectives on the varied forms of cognition emerging in complex collaborative contexts. Second, it supports research by providing diagnostic guidelines to study how artifacts are related to team cognition. Finally, it supports information systems designers by more precisely describing how to conceptualize team-supporting technology and artifacts. As such, it provides a means to more richly understand process and performance as it occurs within sociotechnical systems. Our overarching objective is to show how team cognition can both be more clearly conceptualized and more precisely measured by integrating theory from cognitive engineering and the cognitive and organizational sciences.

  12. Improving engineering effectiveness

    NASA Technical Reports Server (NTRS)

    Fiero, J. D.

    1985-01-01

    Methodologies to improve engineering productivity were investigated. The rocky road to improving engineering effectiveness is reviewed utilizing a specific semiconductor engineering organization as a case study. The organization had a performance problem regarding new product introductions. With the help of this consultant as a change agent the engineering team used a systems approach to through variables that were effecting their output significantly. Critical factors for improving this engineering organization's effectiveness and the roles/responsibilities of management, the individual engineers and the internal consultant are discussed.

  13. Teaching Mathematics to Civil Engineers

    ERIC Educational Resources Information Center

    Sharp, J. J.; Moore, E.

    1977-01-01

    This paper outlines a technique for teaching a rigorous course in calculus and differential equations which stresses applicability of the mathematics to problems in civil engineering. The method involves integration of subject matter and team teaching. (SD)

  14. KSC-99pp0285

    NASA Image and Video Library

    1999-03-06

    At the award ceremony for the 1999 FIRST Southeastern Regional robotic competition held at KSC, one of the winning teams, from Ocoee, Fla., is greeted by (left to right) astronaut David Brown, Deputy Director for Launch and Payload Processing Loren Shriver, Center Director Roy Bridges, and two unidentified judges. FIRST is a nonprofit organization, For Inspiration and Recognition of Science and Technology, that sponsors the event pitting gladiator robots against each other in an athletic-style competition. The FIRST robotics competition is designed to provide students with a hands-on, inside look at engineering and other professional careers, pairing high school students with engineer mentors and corporations. The regional event comprised 27 teams. Along with the championship award, which went to high school teams from Miami and San German, Puerto Rico, 15 other awards were presented

  15. Final matches of the FIRST regional robotic competition at KSC

    NASA Technical Reports Server (NTRS)

    1999-01-01

    Students cheer their team during final matches at the 1999 Southeastern Regional robotic competition at the KSC Visitor Complex. Thirty schools from around the country have converged at KSC for the event that pits gladiator robots against each other in an athletic-style competition. The robots have to retrieve pillow-like disks from the floor, climb onto a platform (with flags), as well as raise the cache of pillows, maneuvered by student teams behind protective walls. KSC is hosting the event being sponsored by the nonprofit organization For Inspiration and Recognition of Science and Technology, known as FIRST. The FIRST robotics competition is designed to provide students with a hands-on, inside look at engineering and other professional careers by pairing engineers and corporations with student teams.

  16. KSC-99pd0279

    NASA Image and Video Library

    1999-03-06

    Student teams behind protective walls operate remote controls to maneuver their robots around the playing field during the 1999 FIRST Southeastern Regional robotic competition held at KSC. The robotic gladiators spent two minutes each trying to grab, claw and hoist large, satin pillows onto their machines. Teams played defense by taking away competitors' pillows and generally harassing opposing machines. On the side of the field are the judges, including (far left) Deputy Director for Launch and Payload Processing Loren Shriver and former KSC Director of Shuttle Processing Robert Sieck. A giant screen TV displays the action on the field. The competition comprised 27 teams, pairing high school students with engineer mentors and corporations. The FIRST robotics competition is designed to provide students with a hands-on, inside look at engineering and other professional careers

  17. The Rocket Engine Advancement Program 2 (REAP2)

    NASA Technical Reports Server (NTRS)

    Harper, Brent (Technical Monitor); Hawk, Clark W.

    2004-01-01

    The Rocket Engine Advancement Program (REAP) 2 program is being conducted by a university propulsion consortium consisting of the University of Alabama in Huntsville, Penn State University, Purdue University, Tuskegee University and Auburn University. It has been created to bring their combined skills to bear on liquid rocket combustion stability and thrust chamber cooling. The research team involves well established and known researchers in the propulsion community. The cure team provides the knowledge base, research skills, and commitment to achieve an immediate and continuing impact on present and future propulsion issues. through integrated research teams composed of analysts, diagnosticians, and experimentalists working together in an integrated multi-disciplinary program. This paper provides an overview of the program, its objectives and technical approaches. Research on combustion instability and thrust chamber cooling are being accomplished

  18. New Hampshire HIV/AIDS Resource-Based Learning Curriculum Project.

    ERIC Educational Resources Information Center

    Snider, Susan C., Ed.

    The age appropriate units of AIDS/HIV instruction in this guide are based on the student outcomes listed in the "New Hampshire Educators HIV/AIDS Handbook: Curriculum and Policy Guide." All of the units, organized by grade levels, were written collaboratively by teams of New Hampshire educators, each team consisting of a library media…

  19. Effective Collaboration among the Gross Motor Assessment Team Members

    ERIC Educational Resources Information Center

    Menear, Kristi S.; Davis, Timothy D.

    2015-01-01

    This article describes the gross motor assessment team (GMAT) members' roles and collaborative approach to making appropriate decisions and modifications when addressing the needs of individuals with disabilities in physical education. Case studies of students are used to demonstrate effective uses of the GMAT. The primary outcome of the GMAT's…

  20. Teacher Assistance Teams: Supporting At-Risk Students in Rural Areas. A Three Year Plan.

    ERIC Educational Resources Information Center

    Chalfant, James C.; And Others

    Teacher Assistance Teams (TAT) can support the collaboration and empowerment of teachers, address student and schoolwide problems, provide preventive intervention for at-risk students, and identify appropriate referrals to special education. This paper describes the implementation of TAT throughout the state of Arkansas over a 3-year period.…

  1. Team-Based Learning in Honors Science Education: The Benefit of Complex Writing Assignments

    ERIC Educational Resources Information Center

    Wiegant, Fred; Boonstra, Johannes; Peeters, Anton; Scager, Karin

    2012-01-01

    Cooperative learning and team-based learning have been widely recognized as beneficial strategies to improve all levels of education, including higher education. Just forming groups, however, does not automatically lead to better learning and motivation; cooperation flourishes only under appropriate conditions (Fink; Gillies; Parmelee et al.).…

  2. Navy Littoral Combat Ship (LCS)/Frigate Program: Background and Issues for Congress

    DTIC Science & Technology

    2015-12-22

    the ships. The Navy continues to review manning to determine appropriate levels, and is adding 20 berths to all seaframes. The increased berthing ...ships would determine the allocation of the three FY2010 ships, with the winning team getting two of the FY2010 ships and the other team getting one

  3. A Developmental Perspective on the Virginia Student Threat Assessment Guidelines

    ERIC Educational Resources Information Center

    Cornell, Dewey G.

    2011-01-01

    The Virginia Student Threat Assessment Guidelines were developed to help multidisciplinary school-based teams use a decision tree to evaluate student threats and take appropriate preventive action. A main goal of this approach is to allow school-based teams to recognize and respond to the developmental complexities of children and adolescents…

  4. "Soft Power" and the Negotiation of Legitimacy: Collective Meaning Making in a Teacher Team

    ERIC Educational Resources Information Center

    Eddy Spicer, David H.

    2013-01-01

    This article interrogates the "soft power" of teacher teamwork by probing the ways in which authority conditions the appropriation of institutional motives through collective meaning making. The study analyzes the interaction of a teacher-leader and a science teacher team across two settings of professional development organized to…

  5. Managing Complex Distance Education Projects in a Telework Environment

    ERIC Educational Resources Information Center

    Ally, Mohamed; Cleveland-Innes, Marti; Wiseman, Colin

    2010-01-01

    The advances of communication technologies have allowed professionals to work on distance education projects in a telework environment. Managers of these projects must have the skills to manage the projects from a distance. They must be able to select the appropriate team members to work on the project, orient team members, and monitor team…

  6. 22 CFR 103.3 - Requirement to provide a sample.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... will notify appropriate site representatives of any request by an Inspection Team to take a sample. At... Inspection Team of the Technical Secretariat. (f) Person to take a sample. If a sample is required, the owner... restrict activities regarding sampling, e.g., conditions that restrict where, when, and how samples are...

  7. Engaging physicians in continuous quality improvement.

    PubMed

    Lindenfeld, S; Vlchek, D

    2001-04-01

    The current ESRD environment poses significant challenges for the medical director and the admitting nephrologist of a dialysis facility. The expectations and requirements of their role have broadened and are under much greater scrutiny today than ever before. A positive response to this challenge lies in the appropriate incorporation of continuous quality improvement (CQI) methods into the provision of dialysis care. By embracing CQI the physician will find these new requirements considerably less taxing and indeed hopefully positive in their impact on the quality of care delivered to his patients. Essential components of the CQI methodology include the use of a multidisciplinary team; participative management; a consistent process, well understood by all team members; a content expert (team leader); and a trained facilitator. A familiarity with CQI tools and techniques and a willingness to play whatever is the most appropriate role in theCQI team-leader, facilitator, or contributing member-will be positive not only to those under the nephrologist's care, but also to his own professional growth and satisfaction as well. Copyright 2001 by the National Kidney Foundation, Inc.

  8. Breaking the silos: The art documentation suite

    DOE PAGES

    Kutschke, Robert K.

    2015-12-23

    The art event-processing framework is used by almost all new experiments at Fermilab, and by several outside of Fermilab. All use art as an external product in the same sense that the compiler, ROOT, Geant4, CLHEP and boost are external products. The art team has embarked on a campaign to document art and develop training materials for new users. Many new users of art have little or no knowledge of C++, software engineering, build systems or the many external packages used by art or their experiments, such as ROOT, CLHEP, HEPPDT, and boost. To effectively teach art requires that themore » training materials include appropriate introductions to these topics as they are encountered. Experience has shown that simply referring readers to the existing native documentation does not work, too often a simple idea that they need to understand is described in a context that presumes prerequisites that are unimportant for a beginning user of art. There is the additional complication that the training materials must be presented in a way that does not presume knowledge of any of the experiments using art. Finally, new users of art arrive at random times throughout the year and the training materials must allow them to start to learn art at any time. This presentation will explain the strategies adopted by the art team to develop a documentation suite that complies with these boundary conditions. It will also show the present status of the documentation suite, including feedback the art team has received from pilot users.« less

  9. The impact of brief team communication, leadership and team behavior training on ad hoc team performance in trauma care settings.

    PubMed

    Roberts, Nicole K; Williams, Reed G; Schwind, Cathy J; Sutyak, John A; McDowell, Christopher; Griffen, David; Wall, Jarrod; Sanfey, Hilary; Chestnut, Audra; Meier, Andreas H; Wohltmann, Christopher; Clark, Ted R; Wetter, Nathan

    2014-02-01

    Communication breakdowns and care coordination problems often cause preventable adverse patient care events, which can be especially acute in the trauma setting, in which ad hoc teams have little time for advanced planning. Existing teamwork curricula do not address the particular issues associated with ad hoc emergency teams providing trauma care. Ad hoc trauma teams completed a preinstruction simulated trauma encounter and were provided with instruction on appropriate team behaviors and team communication. Teams completed a postinstruction simulated trauma encounter immediately afterward and 3 weeks later, then completed a questionnaire. Blinded raters rated videotapes of the simulations. Participants expressed high levels of satisfaction and intent to change practice after the intervention. Participants changed teamwork and communication behavior on the posttest, and changes were sustained after a 3-week interval, though there was some loss of retention. Brief training exercises can change teamwork and communication behaviors on ad hoc trauma teams. Copyright © 2014 Elsevier Inc. All rights reserved.

  10. Just allocation and team loyalty: a new virtue ethic for emergency medicine

    PubMed Central

    Girod, J; Beckman, A

    2005-01-01

    When traditional virtue ethics is applied to clinical medicine, it often claims as its goal the good of the individual patient, and focuses on the dyadic relationship between one physician and one patient. An alternative model of virtue ethics, more appropriate to the practice of emergency medicine, will be outlined by this paper. This alternative model is based on the assumption that the appropriate goal of the practice of emergency medicine is a team approach to the medical wellbeing of individual patients, constrained by the wellbeing of the patient population served by a particular emergency department. By defining boundaries and using the key virtues of justice and team loyalty, this model fits emergency practice well and gives care givers the conceptual clarity to apply this model to various conflicts both within the department and with those outside the department. PMID:16199595

  11. Biomedical and Human Factors Requirements for a Manned Earth Orbiting Station

    NASA Technical Reports Server (NTRS)

    Benjamin, F.; Helvey, W. M.; Martell, C.; Peters, J.; Rosenthal, G.

    1964-01-01

    This report is the result of a study conducted by Republic Aviation Corporation in conjunction with Spacelabs, Inc.,in a team effort in which Republic Aviation Corporation was prime contractor. In order to determine the realistic engineering design requirements associated with the medical and human factors problems of a manned space station, an interdisciplinary team of personnel from the Research and Space Divisions was organized. This team included engineers, physicians, physiologists, psychologists, and physicists. Recognizing that the value of the study is dependent upon medical judgments as well as more quantifiable factors (such as design parameters) a group of highly qualified medical consultants participated in working sessions to determine which medical measurements are required to meet the objectives of the study. In addition, various Life Sciences personnel from NASA (Headquarters, Langley, MSC) participated in monthly review sessions. The organization, team members, consultants, and some of the part-time contributors are shown in Figure 1. This final report embodies contributions from all of these participants.

  12. [Involvement of medical representatives in team medical care].

    PubMed

    Hirotsu, Misaki; Sohma, Michiro; Takagi, Hidehiko

    2009-04-01

    In recent years, chemotherapies have been further advanced because of successive launch of new drugs, introduction of molecular targeting, etc., and the concept of so-called Team Medical Care ,the idea of sharing interdisciplinary expertise for collaborative treatment, has steadily penetrated in the Japanese medical society. Dr. Naoto Ueno is a medical oncologist at US MD Anderson Cancer Center, the birthplace of the Team Medical Care. He has advocated the concept of ABC of Team Oncology by positioning pharmaceutical companies as Team C. Under such team practice, we believe that medical representatives of a pharmaceutical company should also play a role as a member of the Team Medical Care by providing appropriate drug use information to healthcare professionals, supporting post-marketing surveillance of treated patients, facilitating drug information sharing among healthcare professionals at medical institutions, etc.

  13. Design Description for Team-Based Execution of Autonomous Missions (TEAM), Spiral 1

    DTIC Science & Technology

    2008-11-18

    TEAM), Spiral 1 Doc. #: Version: 1.0 Date: November 18, 2008 Page 12 of 39 Visualization Framework (WorldWind) Hibernate / Hibernate ...Spatial hibernate -properties XML Mapping WCS WFSWMS Enterprise Service Bus (Mule) Messaging, Data Transformation, Intelligent Routing Workflow Engine...government selected solutions. Neither these nor Mule® are deliverable, but the government may opt to use them if it so chooses. jBPM, java Business

  14. Climbing the Extravehicular Activity (EVA) Wall - Safely

    NASA Technical Reports Server (NTRS)

    Fuentes, Jose; Greene, Stacie

    2010-01-01

    The success of the EVA team, that includes the EVA project office, Crew Office, Mission Operations, Engineering and Safety, is assured by the full integration of all necessary disciplines. Safety participation in all activities from hardware development concepts, certification and crew training, provides for a strong partnership within the team. Early involvement of Safety on the EVA team has mitigated risk and produced a high degree of mission success.

  15. Exploration Design Challenge 2014

    NASA Image and Video Library

    2014-04-25

    Team ARES poses with NASA Administrator Charles Bolden and Lockheed Martin CEO, Marillyn Hewson. Team ARES was the winner of the Exploration Design Challenge. The goal of the Exploration Design Challenge is for students to research and design ways to protect astronauts from space radiation. The winning team was announced on April 25, 2014 at the USA Science and Engineering Festival at the Washington Convention Center in Washington, DC. Photo Credit: (NASA/Aubrey Gemignani)

  16. NASA Planning for Orion Multi-Purpose Crew Vehicle Ground Operations

    NASA Technical Reports Server (NTRS)

    Letchworth, Gary; Schlierf, Roland

    2011-01-01

    The NASA Orion Ground Processing Team was originally formed by the Kennedy Space Center (KSC) Constellation (Cx) Project Office's Orion Division to define, refine and mature pre-launch and post-landing ground operations for the Orion human spacecraft. The multidisciplined KSC Orion team consisted of KSC civil servant, SAIC, Productivity Apex, Inc. and Boeing-CAPPS engineers, project managers and safety engineers, as well as engineers from Constellation's Orion Project and Lockheed Martin Orion Prime contractor. The team evaluated the Orion design configurations as the spacecraft concept matured between Systems Design Review (SDR), Systems Requirement Review (SRR) and Preliminary Design Review (PDR). The team functionally decomposed prelaunch and post-landing steps at three levels' of detail, or tiers, beginning with functional flow block diagrams (FFBDs). The third tier FFBDs were used to build logic networks and nominal timelines. Orion ground support equipment (GSE) was identified and mapped to each step. This information was subsequently used in developing lower level operations steps in a Ground Operations Planning Document PDR product. Subject matter experts for each spacecraft and GSE subsystem were used to define 5th - 95th percentile processing times for each FFBD step, using the Delphi Method. Discrete event simulations used this information and the logic network to provide processing timeline confidence intervals for launch rate assessments. The team also used the capabilities of the KSC Visualization Lab, the FFBDs and knowledge of the spacecraft, GSE and facilities to build visualizations of Orion pre-launch and postlanding processing at KSC. Visualizations were a powerful tool for communicating planned operations within the KSC community (i.e., Ground Systems design team), and externally to the Orion Project, Lockheed Martin spacecraft designers and other Constellation Program stakeholders during the SRR to PDR timeframe. Other operations planning tools included Kaizen/Lean events, mockups and human factors analysis. The majority of products developed by this team are applicable as KSC prepares 21st Century Ground Systems for the Orion Multi-Purpose Crew Vehicle and Space Launch System.

  17. Optimal qualifications, staffing and scope of practice for first responder nurses in disaster.

    PubMed

    Yin, Huahua; He, Haiyan; Arbon, Paul; Zhu, Jingci; Tan, Jing; Zhang, Limei

    2012-01-01

    To explore: the selection criteria for first responder nurses during disaster; scope of practice for disaster relief nurses; appropriate nurse - medical practitioner ratio at the disaster site. Nurses are key members of disaster response medical teams. A scarcity of literature exists relating to nurses attending disasters, their qualifications, experience, scope of practice and appropriate staffing ratios. Qualitative and quantitative data were collected via survey using self-developed questionnaires. Participants were 95 medical workers, who participated in emergency rescue teams following the 2008 Wenchuan earthquake in China. A response rate of 93·7% achieved. The questionnaire included questions relating to nurses: previous experience in disaster relief; scope of practice at the disaster site; optimal ratio of medical practitioners to nurses in disaster relief teams. Following a disaster, first responder nurses considered most suitable were those with at least three years clinical experience, particularly in the emergency department or having emergency rescue skills training. The scope of practice for disaster relief nurses was different to that of nurses working in a hospital. The majority of participants reported insufficient nurses during the relief effort, concluding the optimal ratio of medical practitioner to nurse should range between 1:1-1:2 depending on the task and situation. At the scene of disaster, the preferred first responder nurses were nurses: with emergency rescue training; experienced in the emergency department; with at least three years clinical experience. The scope of practice for first responder nurses needs to be extended. Appropriate nurse - medical practitioner ratios in responding medical teams is dependant on the specific medical requirements of the disaster. The recommendations made by this study provide a guide to ensure that nurses can contribute effectively as essential members of first responder emergency disaster relief teams. © 2011 Blackwell Publishing Ltd.

  18. National Biocontainment Training Center

    DTIC Science & Technology

    2012-08-01

    past reporting year, the training facility’s engineering and maintenance team welcomed trainees from the Institutio Nacional de Enfermedades Virales... Enfermedades Virales Humanas “Dr. Julio Maiztegui” and the Universidad Technologica Nacional attended the NBTC’s Biocontainment Engineering Training Program

  19. Efficacy of an Online Resource for Teaching Interpersonal Problem Solving Skills to Women Graduate Students in Engineering

    ERIC Educational Resources Information Center

    Bekki, Jennifer M.; Bernstein, Bianca; Fabert, Natalie; Gildar, Natalie; Way, Amy

    2014-01-01

    Interpersonal problem solving skills allow engineers to prevent interpersonal difficulties more effectively and to manage conflict, both of which are critical to successful participation on teams. This research provides evidence that the "Career"WISE online learning environment can improve those skills among women in engineering graduate…

  20. Biomedical Engineering and Cognitive Science Secondary Science Curriculum Development: A Three Year Study

    ERIC Educational Resources Information Center

    Klein, Stacy S.; Sherwood, Robert D.

    2005-01-01

    This study reports on a multi-year effort to create and evaluate cognitive-based curricular materials for secondary school science classrooms. A team of secondary teachers, educational researchers, and academic biomedical engineers developed a series of curriculum units that are based in biomedical engineering for secondary level students in…

  1. Engineering Students Designing a Statistical Procedure for Quantifying Variability

    ERIC Educational Resources Information Center

    Hjalmarson, Margret A.

    2007-01-01

    The study examined first-year engineering students' responses to a statistics task that asked them to generate a procedure for quantifying variability in a data set from an engineering context. Teams used technological tools to perform computations, and their final product was a ranking procedure. The students could use any statistical measures,…

  2. Engineering Encounters: Sailing into the Digital Era

    ERIC Educational Resources Information Center

    Bellavance, Janet; Truchon, Amy

    2015-01-01

    This article describes how Janet Bellavance teamed with technology integration specialist, Amy Truchon to incorporate iPads into her Engineering is Elementary (EiE) unit--a curriculum that engages elementary students in engineering simple technologies. In an EiE unit, students design, test, and then, based on test results, improve their design,…

  3. Collaborating for Success: Team Teaching the Engineering Technical Thesis

    ERIC Educational Resources Information Center

    Keating, Terrence; Long, Mike

    2012-01-01

    This paper will examine the collaborative teaching process undertaken at College of the North Atlantic-Qatar (CNA-Q) by Engineering and the Communication faculties to improve the overall quality of engineering students' capstone projects known as the Technical Thesis. The Technical Thesis is divided into two separate components: a proposal stage…

  4. Gender and Participation in an Engineering Problem-Based Learning Environment

    ERIC Educational Resources Information Center

    Hirshfield, Laura; Koretsky, Milo D.

    2018-01-01

    The use of problem-based learning (PBL) is gaining attention in the engineering classroom as a way to help students synthesize foundational knowledge and to better prepare students for practice. In this work, we study the discourse interactions between 27 student teams and two instructors in an engineering PBL environment to analyze how…

  5. Antenna Development for Multifunctional Armor Applications Using Embedded Spin-Torque Nano-Oscillator (STNO) as a Microwave Detector

    DTIC Science & Technology

    2011-08-01

    Thomas Meitzler (Team Leader, Research Engineer), Dr. Elena Bankowski (Research Engineer) & Mr. Steven Zielinski (Engineer). •Oakland University...our experiments. •We would like to thank TARDEC Director Dr. Grace Bochenek, the Chief Scientist Dr. Dave Gorsich and GVSS Associate Director Mr. Steve

  6. The 2015-2016 SEPMAP Program at NASA JSC: Science, Engineering, and Program Management Training

    NASA Technical Reports Server (NTRS)

    Graham, L.; Archer, D.; Bakalyar, J.; Berger, E.; Blome, E.; Brown, R.; Cox, S.; Curiel, P.; Eid, R.; Eppler, D.; hide

    2017-01-01

    The Systems Engineering Project Management Advancement Program (SEPMAP) at NASA Johnson Space Center (JSC) is an employee development program designed to provide graduate level training in project management and systems engineering. The program includes an applied learning project with engineering and integrated science goals requirements. The teams were presented with a task: Collect a representative sample set from a field site using a hexacopter platform, as if performing a scientific reconnaissance to assess whether the site is of sufficient scientific interest to justify exploration by astronauts. Four teams worked through the eighteen-month course to design customized sampling payloads integrated with the hexacopter, and then operate the aircraft to meet sampling requirements of number (= 5) and mass (= 5g each). The "Mars Yard" at JSC was utilized for this purpose. This project activity closely parallels NASA plans for the future exploration of Mars, where remote sites will be reconnoitered ahead of crewed exploration.

  7. How Engineers Really Think About Risk: A Study of JPL Engineers

    NASA Technical Reports Server (NTRS)

    Hihn, Jairus; Chattopadhyay, Deb; Valerdi, Ricardo

    2011-01-01

    The objectives of this work are: To improve risk assessment practices as used during the mission design process by JPL's concurrent engineering teams. (1) Developing effective ways to identify and assess mission risks (2) Providing a process for more effective dialog between stakeholders about the existence and severity of mission risks (3) Enabling the analysis of interactions of risks across concurrent engineering roles.

  8. National Science Bowl | NREL

    Science.gov Websites

    and high school student teams on science and math topics. The National Science Bowl provides an opportunity for students to develop science, technology, engineering, and math (STEM) skills in a non tournament challenges students' knowledge of science. Student teams are questioned on life science, math

  9. These College Teams Go Sky-High Competing for a Championship.

    ERIC Educational Resources Information Center

    Monaghan, Peter

    1986-01-01

    The National Collegiate Flying Association's annual national competition in flight skills and safety involves competition among flight-trained college students and teams in precision landing with and without engines, cross-country navigation, flight-computer accuracy, message drops, preflight inspection proficiency, and aircraft recognition. (MSE)

  10. 10 CFR 70.62 - Safety program and integrated safety analysis.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...) Radiological hazards related to possessing or processing licensed material at its facility; (ii) Chemical hazards of licensed material and hazardous chemicals produced from licensed material; (iii) Facility... performed by a team with expertise in engineering and process operations. The team shall include at least...

  11. An Architecture for Learning in Projects?

    ERIC Educational Resources Information Center

    Sense, Andrew J.

    2004-01-01

    This paper reports upon a two-year, qualitative, case study action research investigation into "learning within a project team". This project team undertook a significant socio-technical redesign project within a major Australian heavy engineering/manufacturing operation. The paper identifies and elaborates upon a number of elements that…

  12. A Return to Innovative Engineering Design, Critical Thinking and Systems Engineering

    NASA Technical Reports Server (NTRS)

    Camarda, Charles J.

    2007-01-01

    I believe we are facing a critical time where innovative engineering design is of paramount importance to the success of our aerospace industry. However, the very qualities and attributes necessary for enhancing, educating, and mentoring a creative spirit are in decline in important areas. The importance of creativity and innovation in this country was emphasized by a special edition of the Harvard Business Review OnPoint entitled: "The Creative Company" which compiled a series of past and present articles on the subject of creativity and innovation and stressed its importance to our national economy. There is also a recognition of a lack of engineering, critical thinking and problem-solving skills in our education systems and a trend toward trying to enhance those skills by developing K-12 educational programs such as Project Lead the Way, "Science for All Americans", Benchmarks 2061 , etc. In addition, with respect to spacecraft development, we have a growing need for young to mid-level engineers with appropriate experience and skills in spacecraft design, development, analysis, testing, and systems engineering. As the Director of Engineering at NASA's Johnson Space Center, I realized that sustaining engineering support of an operational human spacecraft such as the Space Shuttle is decidedly different than engineering design and development skills necessary for designing a new spacecraft such as the Crew Exploration Vehicle of the Constellation Program. We learned a very important lesson post Columbia in that the Space Shuttle is truly an experimental and not an operational vehicle and the strict adherence to developed rules and processes and chains of command of an inherently bureaucratic organizational structure will not protect us from a host of known unknowns let alone unknown unknowns. There are no strict rules, processes, or procedures for understanding anomalous results of an experiment, anomalies with an experimental spacecraft like Shuttle, or in the conceptual design of a spacecraft. Engineering design is as much an art as it is a science. The critical thinking skills necessary to uncover lurking problems in an experimental design and creatively develop solutions are some of the same skills necessary to design a new spacecraft. Thus, I believe engineers unfamiliar with or removed from design and development need time to transition and develop the required skill set to be effective spacecraft designers. I believe the creative process necessary in design can be enhanced and even taught as early as grades K-12 and should continue to be nurtured and developed at the university level and beyond. I am going to present a strategy for developing learning teams to address complex multidisciplinary problems and to creatively develop solutions to those problems rapidly at minimal cost. I will frame a real problem, the development of on-orbit thermal protection system repair of the Space Shuttle, and step through the series of skills necessary to enhance the creative process. The case study I will illustrate is based on a real project, the R&D Reinforced Carbon-Carbon (RCC) Repair Team's development of on-orbit repair concepts for damaged Space Shuttle RCC nose cap and/or leading edges.

  13. Cost-minimization model of a multidisciplinary antibiotic stewardship team based on a successful implementation on a urology ward of an academic hospital.

    PubMed

    Dik, Jan-Willem H; Hendrix, Ron; Friedrich, Alex W; Luttjeboer, Jos; Panday, Prashant Nannan; Wilting, Kasper R; Lo-Ten-Foe, Jerome R; Postma, Maarten J; Sinha, Bhanu

    2015-01-01

    In order to stimulate appropriate antimicrobial use and thereby lower the chances of resistance development, an Antibiotic Stewardship Team (A-Team) has been implemented at the University Medical Center Groningen, the Netherlands. Focus of the A-Team was a pro-active day 2 case-audit, which was financially evaluated here to calculate the return on investment from a hospital perspective. Effects were evaluated by comparing audited patients with a historic cohort with the same diagnosis-related groups. Based upon this evaluation a cost-minimization model was created that can be used to predict the financial effects of a day 2 case-audit. Sensitivity analyses were performed to deal with uncertainties. Finally, the model was used to financially evaluate the A-Team. One whole year including 114 patients was evaluated. Implementation costs were calculated to be €17,732, which represent total costs spent to implement this A-Team. For this specific patient group admitted to a urology ward and consulted on day 2 by the A-Team, the model estimated total savings of €60,306 after one year for this single department, leading to a return on investment of 5.9. The implemented multi-disciplinary A-Team performing a day 2 case-audit in the hospital had a positive return on investment caused by a reduced length of stay due to a more appropriate antibiotic therapy. Based on the extensive data analysis, a model of this intervention could be constructed. This model could be used by other institutions, using their own data to estimate the effects of a day 2 case-audit in their hospital.

  14. Engineer: The Professional Bulletin of Army Engineers. Volume 38, PB 5-08-3/4, July-December 2008

    DTIC Science & Technology

    2008-12-01

    50 The Battle of Shiloh By Captain John T. Shelton 54 Pioneering Nondoctrinal Bridging Operations: The “Roller Skate ” Repair By First...for Army Lessons Learned (CALL) to conduct an Engineer and Base Camp Collection and Analysis Team (CAAT). As a result of this trip, we collected a...provided an outbrief at the 20th Engineer Brigade Lessons Learned Conference in December. Many thanks to the 20th Engineer Brigade, 926th Engineer

  15. KSC-99pp0284

    NASA Image and Video Library

    1999-03-06

    At the award ceremony for the 1999 FIRST Southeastern Regional robotic competition held at KSC, Center Director Roy Bridges addresses the teams, encouraging them to continue their interest in engineering. Directly behind him (left) are Woody Flowers, national advisor to FIRST, and (right) former KSC Director of Shuttle Processing Robert Sieck, who served as one of the judges. At the far left, students gather around astronaut David Brown, who was present during the two days of matches. At right are other judges, including Deputy Director for Launch and Payload Processing Loren Shriver (third from right). FIRST is a nonprofit organization, For Inspiration and Recognition of Science and Technology, that sponsors the event pitting gladiator robots against each other in an athletic-style competition. The FIRST robotics competition is designed to provide students with a hands-on, inside look at engineering and other professional careers, pairing high school students with engineer mentors and corporations. The regional event comprised 27 teams. Along with the championship award, which went to high school teams in Miami and San German, Puerto Rico, 15 other awards were presented

  16. Around Marshall

    NASA Image and Video Library

    2003-07-01

    In honor of the Centernial of Flight celebration and commissioned by the American Institute of Aeronautics and Astronautics (AIAA), a team of engineers from Marshall Space Flight Center (MSFC) built a replica of the first liquid-fueled rocket. The original rocket, designed and built by rocket engineering pioneer Robert H. Goddard in 1926, opened the door to modern rocketry. Goddard's rocket reached an altitude of 41 feet while its flight lasted only 2.5 seconds. The Marshall design team's plan was to stay as close as possible to an authentic reconstruction of Goddard's rocket. The same propellants were used - liquid oxygen and gasoline - as available during Goddard's initial testing and firing. The team also tried to construct the replica using the original materials and design to the greatest extent possible. By purposely using less advanced techniques and materials than many that are available today, the team encountered numerous technical challenges in testing the functional hardware. There were no original blueprints or drawings, only photographs and notes. However, this faithful adherence to historical accuracy has also allowed the team to experience many of the same challenges Goddard faced 77 years ago, and more fully appreciate the genius of this extraordinary man. The replica will undergo ground tests at MSFC this summer.

  17. The impact of leadership and team behavior on standard of care delivered during human patient simulation: a pilot study for undergraduate medical students.

    PubMed

    Carlson, Jim; Min, Elana; Bridges, Diane

    2009-01-01

    Methodology to train team behavior during simulation has received increased attention, but standard performance measures are lacking, especially at the undergraduate level. Our purposes were to develop a reliable team behavior measurement tool and explore the relationship between team behavior and the delivery of an appropriate standard of care specific to the simulated case. Authors developed a unique team measurement tool based on previous work. Trainees participated in a simulated event involving the presentation of acute dyspnea. Performance was rated by separate raters using the team behavior measurement tool. Interrater reliability was assessed. The relationship between team behavior and the standard of care delivered was explored. The instrument proved to be reliable for this case and group of raters. Team behaviors had a positive relationship with the standard of medical care delivered specific to the simulated case. The methods used provide a possible method for training and assessing team performance during simulation.

  18. The Tsunami Project: Integrating engineering, natural and social sciences into post-tsunami surveys

    NASA Astrophysics Data System (ADS)

    McAdoo, B. G.; Goff, J. R.; Fritz, H. M.; Cochard, R.; Kong, L. S.

    2009-12-01

    Complexities resulting from recent tsunamis in the Solomon Islands (2007), Java (2006) and Sumatra (2004, 2005) have demonstrated the need for an integrated, interdisciplinary team of engineers, natural and social scientists to better understand the nature of the disaster. Documenting the complex interactions in the coupled human-environment system necessitate a coordinated, interdisciplinary approach that combines the strengths of engineering, geoscience, ecology and social science. Engineers, modelers and geoscientists untangle the forces required to leave an imprint of a tsunami in the geologic record. These same forces affect ecosystems that provide services from buffers to food security; therefore coastal ecologists play a vital role. It is also crucial to understand the social structures that contribute to disasters, so local or regional policy experts, planners, economists, etc. should be included. When these experts arrive in a disaster area as part of an Interdisciplinary Tsunami Survey Team, the interactions between the systems can be discussed in the field, and site-specific data can be collected. A diverse team in the field following a tsunami shares critical resources and discoveries in real-time, making the survey more efficient. Following the 2006 Central Java earthquake and tsunami, civil engineers covered broad areas quickly, collecting ephemeral water level data and communicating areas of interest to the geologists, who would follow to do the slower sediment data collection. The 2007 Solomon Islands earthquake and tsunami caused extensive damage to the coral reef, which highlighting the need to have an ecologist on the team who was able to identify species and their energy tolerance. Rather than diluting the quality of post-tsunami data collection, this approach in fact strengthens it- engineers and geoscientists no longer have to indentify coral or mangrove species, nor do ecologists evaluate the velocity of a wave as it impacted a forested coastline. Interviews, a core element of post-tsunami surveys and which most US academic institutions require human-subject training to complete, can be undertaken by social scientists trained to ask pertinent questions to both the natural scientists and engineers, and those that will illuminate the underlying weaknesses of the social institutions that contributed to the magnitude of the disaster. Data collected by interdisciplinary teams provides baseline data that can set the redevelopment process off on the right track. Geoscientists constrain the location, frequency and magnitude of hazards, and how they affect the landscape. Ecologists document the interaction of hazards with ecosystems and evaluate their risk reduction role. Engineers and modelers constrain the effects of a hazard on the built environment. A coupled human-environment approach at the intersection of the physical, ecological and the built environments provides the right kind of data decision makers need to build back better in the most ecologically and economically sustainable manner.

  19. Differences in end-of-life communication for children with advanced cancer who were referred to a palliative care team.

    PubMed

    Kassam, Alisha; Skiadaresis, Julia; Alexander, Sarah; Wolfe, Joanne

    2015-08-01

    There is a general consensus that involving a specialized palliative care team in the care of children with advanced cancer can help optimize end-of-life communication; however, how this compares to standard oncology care is still unknown. We aimed to determine whether there was an association between specialist palliative care involvement and improved end-of-life communication for children with advanced cancer and their families. We administered questionnaires to 75 bereaved parents (response rate 54%). Outcome measures were presence or absence of 11 elements related to end-of-life communication. Parents were significantly more likely to receive five communication elements if their child was referred to a palliative care team. These elements are: discussion of death and dying with parents by the healthcare team (P<0.01); discussion of death and dying with child by the healthcare team when appropriate (P < 0.01); providing parents with guidance on how to talk to their child about death and dying when appropriate (P < 0.01); preparing parents for medical aspects surrounding death (P = 0.02) and sibling support (P = 0.02). Children were less likely to be referred to a palliative care team if they had a hematologic malignancy. Children who receive standard oncology care are at higher risk of not receiving critical communication elements at end of life. Strategies to optimize end-of-life communication for children who are not referred to a palliative care team are needed. © 2015 Wiley Periodicals, Inc.

  20. Examining engineering costs for development of highway projects.

    DOT National Transportation Integrated Search

    2012-12-01

    The Texas Department of Transportation (TxDOT) commissioned a research team at Texas State University-San Marcos Department of Accounting to analyze the cost of projects by determining the cost of a preliminary engineering hour necessary to develop h...

  1. Systematic Approach to the Development, Evolution, and Effectiveness of Integrated Product Development Teams (IPDTs)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Margie Jeffs; R. Douglas Hamelin

    Integrated Product Development Teams (IPDT) are a key component of any systems engineering (SE) application, but since they are formed primarily from technical considerations, many IPDTs are far less productive than they otherwise could be. By recognizing specific personality types and skill sets, a random group of 'technical' individuals can be structured to become a highly effective team capable of delivering much more than the sum of its members.

  2. Exploration Design Challenge 2014

    NASA Image and Video Library

    2014-04-25

    Sponsors of all of the semi-finalist teams in the Exploration Design Challenge pose for a group photo with the teams. Team ARES from the Governors School for Science and Technology in Hampton, Va. won the challenge with their radiation shield design, which will be built and flown aboard the Orion/EFT-1. The award was announced at the USA Science and Engineering Festival on April 25, 2014 at the Washington Convention Center. Photo Credit: (NASA/Aubrey Gemignani)

  3. Exploration Design Challenge 2014

    NASA Image and Video Library

    2014-04-25

    Sponsors of Team ARES pose for a group photo with the winning high school team in the Exploration Design Challenge. Team ARES from the Governors School for Science and Technology in Hampton, Va. won the challenge with their radiation shield design, which will be built and flown aboard the Orion/EFT-1. The award was announced at the USA Science and Engineering Festival on April 25, 2014 at the Washington Convention Center. Photo Credit: (NASA/Aubrey Gemignani)

  4. A Method for Selection of Appropriate Assistive Technology for Computer Access

    ERIC Educational Resources Information Center

    Jenko, Mojca

    2010-01-01

    Assistive technologies (ATs) for computer access enable people with disabilities to be included in the information society. Current methods for assessment and selection of the most appropriate AT for each individual are nonstandardized, lengthy, subjective, and require substantial clinical experience of a multidisciplinary team. This manuscript…

  5. Making the Transition to Hospice: Exploring Hospice Professionals' Perspectives

    ERIC Educational Resources Information Center

    Waldrop, Deborah P.; Rinfrette, Elaine S.

    2009-01-01

    Hospice care is available for 6 months before death but the length of use varies widely, suggesting that there are different perspectives on the appropriate timing for this transition. This qualitative study explored hospice professionals' views on the appropriate timing for and communication about hospice. Ethnography of team meetings informed…

  6. Simulation Models for Developing an Individualized, Performance Criterion Learning Situation. Technical Monograph No. 21.

    ERIC Educational Resources Information Center

    Anderson, G. Ernest, Jr.

    The mission of the simulation team of the Model Elementary Teacher Education Project, 1968-71, was to develop simulation tools and conduct appropriate studies of the anticipated operation of that project. The team focused on the experiences of individual students and on the resources necessary for these experiences to be reasonable. This report…

  7. Marine Corps Amphibious Combat Vehicle (ACV) and Marine Personnel Carrier (MPC): Background and Issues for Congress

    DTIC Science & Technology

    2014-02-28

    teams might now have the ability to generate effects once associated with larger forces, the Marines propose that company landing teams ( CLTs ...might now be a more appropriately sized force for most amphibious operations.14 CLTs are viewed as being small enough to be inserted in a single wave but

  8. Student Participation in Rover Field Trials

    NASA Astrophysics Data System (ADS)

    Bowman, C. D.; Arvidson, R. E.; Nelson, S. V.; Sherman, D. M.; Squyres, S. W.

    2001-12-01

    The LAPIS program was developed in 1999 as part of the Athena Science Payload education and public outreach, funded by the JPL Mars Program Office. For the past three years, the Athena Science Team has been preparing for 2003 Mars Exploration Rover Mission operations using the JPL prototype Field Integrated Design and Operations (FIDO) rover in extended rover field trials. Students and teachers participating in LAPIS work with them each year to develop a complementary mission plan and implement an actual portion of the annual tests using FIDO and its instruments. LAPIS is designed to mirror an end-to-end mission: Small, geographically distributed groups of students form an integrated mission team, working together with Athena Science Team members and FIDO engineers to plan, implement, and archive a two-day test mission, controlling FIDO remotely over the Internet using the Web Interface for Telescience (WITS) and communicating with each other by email, the web, and teleconferences. The overarching goal of LAPIS is to get students excited about science and related fields. The program provides students with the opportunity to apply knowledge learned in school, such as geometry and geology, to a "real world" situation and to explore careers in science and engineering through continuous one-on-one interactions with teachers, Athena Science Team mentors, and FIDO engineers. A secondary goal is to help students develop improved communication skills and appreciation of teamwork, enhanced problem-solving skills, and increased self-confidence. The LAPIS program will provide a model for outreach associated with future FIDO field trials and the 2003 Mars mission operations. The base of participation will be broadened beyond the original four sites by taking advantage of the wide geographic distribution of Athena team member locations. This will provide greater numbers of students with the opportunity to actively engage in rover testing and to explore the possibilities of science, engineering, and technology.

  9. Youth Technology Academy

    NASA Technical Reports Server (NTRS)

    2005-01-01

    One of the most important aspects of the YTA Program is that students, working with Tri-C instructors, NASA engineers, and technicians, begin to build relationships with professionals with whom they might not normally have contact. These professionals serve as role models for students and help them to apply math, science and problem-solving skills in real time to construct a competition-ready robot, allowing them to experience the satisfaction and challenges of an engineering or technical career by working diligently to solve problems that may never have been thought possible to solve. Transcending school boundaries, YTA is available to all students who are interested and qualified but who may otherwise never get an opportunity to participate because their school does not offer a robotics program. YTA fills an educational void by offering an exciting engineering and technology experience to a greater number of students than have been able to participate in the past. Our students have been working hard and see the long-term rewards for their efforts. The YTA Team 1270 was a finalist at the 2005 FIRST Robotics Florida Regional and took home second- place honors. Mark Poljak, nominated by the students of YTA Team 1270, received the Woodie Flowers Award at the FIRST 2005 Buckeye Regional competition. This award celebrates effective communication in the art and science of engineering and design. The YTA Team was also invited, as one of fifty-four teams, to participate in this year s FIRST VEX Robotics tournament representing Cuyahoga Community College and NASA GRC (Team 26), held at the FIRST Robotics National Competition in Atlanta, GA. Because of our efforts, community colleges from around the country have taken notice and have asked us to become part of the executive board of the RoboEducators, whose mission is to bring technology training to high school students in preparation for the future workforce.

  10. Improving Student Achievement in Introductory Computer Science Courses Using Peer-Led Team Learning

    ERIC Educational Resources Information Center

    Dennis, Sonya Maria

    2013-01-01

    There has been a steady decline of majors in the disciplines of science, technology, engineering, and mathematics ("STEM majors"). In an effort to improve recruitment and retention in "STEM" majors, an active-learning methodology--"peer-led team learning" ("PLTL")--was implemented by the participating…

  11. Interdisciplinary Team Education Promotes Innovations in the Home Care of Older People

    ERIC Educational Resources Information Center

    Pitkälä, Kaisu H.; Finne-Soveri, Harriet; Immonen, Susanna; Lehti, Tuuli; Tiilikainen, Ida; Vesterinen, Teppo; Saarinen, Esa

    2018-01-01

    This article describes a new type of team training that involves undergraduate students of medicine, students from the Aalto University (industrial engineering and management, architecture, information networks, collaborative and industrial design and bioinformation technology) and specialized home care nurses. During the course, the students…

  12. A Student's Perspective: The Green Team's Project

    ERIC Educational Resources Information Center

    Pratt, Kyle

    2011-01-01

    In Mr. Wood's technology class, students learned about many aspects of engineering, including design of a product, teamwork, testing hypotheses, and testing the final product. In this article, the author describes how his class, particularly his team, applied everything they learned about the process to their kayak design challenge using the IDEAL…

  13. VE at Scope Time (VEST): Three construction examples

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sperling, R.B.

    1991-04-01

    Value Engineering at Scope Time (VEST)'' was published in Value World, January-February-March 1991. That article describes VEST as a four-phase process utilizing the heart'' of VE methodology, which is designed to be used with members of construction design teams to help them focus on the scope of work by doing cost modeling, function analysis, brainstorming and evaluation of ideas. With minimal training designers, architects and engineers can become energized to find creative design solutions and learn an effective, synergistic team approach to facilities design projects using VEST. If time is available, the team can begin the development of some highermore » ranked ideas into preliminary proposals. This paper is an expansion of that article, adding a brief section on training and presenting three examples of VEST on construction projects at a federally-funded research Laboratory.« less

  14. Final matches of the FIRST regional robotic competition at KSC

    NASA Technical Reports Server (NTRS)

    1999-01-01

    Student teams behind protective walls operate remote controls to maneuver their robots around the playing field during the 1999 FIRST Southeastern Regional robotic competition held at KSC. The robotic gladiators spent two minutes each trying to grab, claw and hoist large, satin pillows onto their machines. Teams played defense by taking away competitors' pillows and generally harassing opposing machines. On the side of the field are the judges, including (far left) Deputy Director for Launch and Payload Processing Loren Shriver and former KSC Director of Shuttle Processing Robert Sieck. A giant screen TV displays the action on the field. The competition comprised 27 teams, pairing high school students with engineer mentors and corporations. The FIRST robotics competition is designed to provide students with a hands-on, inside look at engineering and other professional careers.

  15. Update on Risk Reduction Activities for a Liquid Advanced Booster for NASA's Space Launch System

    NASA Technical Reports Server (NTRS)

    Crocker, Andrew M.; Doering, Kimberly B; Meadows, Robert G.; Lariviere, Brian W.; Graham, Jerry B.

    2015-01-01

    The stated goals of NASA's Research Announcement for the Space Launch System (SLS) Advanced Booster Engineering Demonstration and/or Risk Reduction (ABEDRR) are to reduce risks leading to an affordable Advanced Booster that meets the evolved capabilities of SLS; and enable competition by mitigating targeted Advanced Booster risks to enhance SLS affordability. Dynetics, Inc. and Aerojet Rocketdyne (AR) formed a team to offer a wide-ranging set of risk reduction activities and full-scale, system-level demonstrations that support NASA's ABEDRR goals. For NASA's SLS ABEDRR procurement, Dynetics and AR formed a team to offer a series of full-scale risk mitigation hardware demonstrations for an affordable booster approach that meets the evolved capabilities of the SLS. To establish a basis for the risk reduction activities, the Dynetics Team developed a booster design that takes advantage of the flight-proven Apollo-Saturn F-1. Using NASA's vehicle assumptions for the SLS Block 2, a two-engine, F-1-based booster design delivers 150 mT (331 klbm) payload to LEO, 20 mT (44 klbm) above NASA's requirements. This enables a low-cost, robust approach to structural design. During the ABEDRR effort, the Dynetics Team has modified proven Apollo-Saturn components and subsystems to improve affordability and reliability (e.g., reduce parts counts, touch labor, or use lower cost manufacturing processes and materials). The team has built hardware to validate production costs and completed tests to demonstrate it can meet performance requirements. State-of-the-art manufacturing and processing techniques have been applied to the heritage F-1, resulting in a low recurring cost engine while retaining the benefits of Apollo-era experience. NASA test facilities have been used to perform low-cost risk-reduction engine testing. In early 2014, NASA and the Dynetics Team agreed to move additional large liquid oxygen/kerosene engine work under Dynetics' ABEDRR contract. Also led by AR, the objectives of this work are to demonstrate combustion stability and measure performance of a 500,000 lbf class Oxidizer-Rich Staged Combustion (ORSC) cycle main injector. A trade study was completed to investigate the feasibility, cost effectiveness, and technical maturity of a domestically produced Atlas V engine that could also potentially satisfy NASA SLS payload-to-orbit requirements via an advanced booster application. Engine physical dimensions and performance parameters resulting from this study provide the system level requirements for the ORSC risk reduction test article. The test article is scheduled to complete critical design review this fall and begin testing in 2017. Dynetics has also designed, developed, and built innovative tank and structure assemblies using friction stir welding to leverage recent NASA investments in manufacturing tools, facilities, and processes, significantly reducing development and recurring costs. The full-scale cryotank assembly was used to verify the structural design and prove affordable processes. Dynetics performed hydrostatic and cryothermal proof tests on the assembly to verify the assembly meets performance requirements. This paper will discuss the ABEDRR engine task and structures task achievements to date and the remaining effort through the end of the contract.

  16. On the Moon: NASA and Design Squad Team Up to Inspire a New Generation of Engineers. Engineering Challenges for School and Afterschool Programs, Grades 3-12. EG-2009-02-05-MSFC

    ERIC Educational Resources Information Center

    Lockwood, Jeff

    2008-01-01

    NASA (National Aeronautics and Space Administration) is one of the biggest employers of engineers in the world--about 90,000 among its own employees and its corporate partners. So it's not surprising that NASA wants kids to learn more about engineering, become interested in the things engineers do, and experience the world of engineering…

  17. Exploration Design Challenge 2014

    NASA Image and Video Library

    2014-04-25

    Pictured are all Semi-finalist teams in the Exploration Design Challenge. NASA Administrator, Charles Bolden and Lockheed Martin CEO, Marillyn Hewson announced the winner of the Exploration Design Challenge at the USA Science and Engineering Festival on April 25, 2014. The goal of the challenge was for students to research and design ways to protect astronauts from space radiation. The winning team's design will be built and flown aboard the Orion/EFT-1. The USA Science and Engineering Festival is taking place at the Washington Convention Center in Washington, DC on April 26 and 27, 2014. Photo Credit: (NASA/Aubrey Gemignani)

  18. FY-12 INL KR CAPTURE ACTIVITIES SUPPORTING THE OFF-GAS SIGMA TEAM

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Troy G. Garn; Mitchell R. Greenhalgh; Jack D Law

    2012-08-01

    Tasks performed this year by INL Kr capture off-gas team members can be segregated into three separate task sub-sections which include: 1) The development and testing of a new engineered form sorbent, 2) An initial NDA gamma scan effort performed on the drum containing the Legacy Kr-85 sample materials, and 3) Collaborative research efforts with PNNL involving the testing of the Ni-DOBDC MOF and an initial attempt to make powdered chalcogel material into an engineered form using our binding process. This document describes the routes to success for the three task sub-sections.

  19. Mercury Orbiter: Report of the Science Working Team

    NASA Technical Reports Server (NTRS)

    Belcher, John W.; Slavin, James A.; Armstrong, Thomas P.; Farquhar, Robert W.; Akasofu, Syun I.; Baker, Daniel N.; Cattell, Cynthia A.; Cheng, Andrew F.; Chupp, Edward L.; Clark, Pamela E.

    1991-01-01

    The results are presented of the Mercury Orbiter Science Working Team which held three workshops in 1988 to 1989 under the auspices of the Space Physics and Planetary Exploration Divisions of NASA Headquarters. Spacecraft engineering and mission design studies at the Jet Propulsion Lab were conducted in parallel with this effort and are detailed elsewhere. The findings of the engineering study, summarized herein, indicate that spin stabilized spacecraft carrying comprehensive particles and fields experiments and key planetology instruments in high elliptical orbits can survive and function in Mercury orbit without costly sun shields and active cooling systems.

  20. Evaluation of American Indian Science and Engineering Society Intertribal Middle School Science and Math Bowl Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    AISES, None

    The American Indian Science and Engineering Society (AISES) has been funded under a U.S. Department of Energy (DOE) grant (Grant Award No. DE-SC0004058) to host an Intertribal Middle-School Science and Math Bowl (IMSSMB) comprised of teams made up of a majority of American Indian students from Bureau of Indian Education-funded schools and public schools. The intent of the AISES middle school science and math bowl is to increase participation of American Indian students at the DOE-sponsored National Science Bowl. Although national in its recruitment scope, the AISES Intertribal Science and Math Bowl is considered a “regional” science bowl, equivalent tomore » the other 50 regional science bowls which are geographically limited to states. Most regional bowls do not have American Indian student teams competing, hence the AISES bowl is meant to encourage American Indian student teams to increase their science knowledge in order to participate at the national level. The AISES competition brings together teams from various American Indian communities across the nation. Each team is provided with funds for travel to and from the event, as well as for lodging and meals. In 2011 and 2012, there were 10 teams participating; in 2013, the number of teams participating doubled to 20. Each Science and Math Bowl team is comprised of four middle school — grades 6 through 8 — students, one alternate, and a teacher who serves as advisor and coach — although in at least two cases, the coach was not a teacher, but was the Indian Education Coordinator. Each team member must have at least a 3.0 GPA. Furthermore, the majority of students in each team must be comprised of American Indian, Alaska Native or Native Hawaiian students. Under the current DOE grant, AISES sponsored three annual middle school science bowl competitions over the years 2011, 2012 and 2013. The science and math bowls have been held in late March concurrently with the National American Indian Science and Engineering Fair (NAISEF) and EXPO at the Albuquerque, NM Convention Center. Albuquerque is also the home of the AISES national office. The AISES staff also recruits volunteers to assist with implementation of the science and math bowl event. In 2011, there were 7 volunteers; in 2012, 15 volunteers, and in 2013, 19 volunteers. Volunteers are recruited from a variety of local sources, including Sandia Laboratories, Southwest Indian Polytechnic Institute students, Department of Defense, as well as family members of AISES staff. For AISES, the goals of the Intertribal Middle School Science and Math Bowl project are to have more Native students learn science, for them to gain confidence in competing, and to reward their effort in order to motivate them to pursue studies in the sciences and engineering. For DOE, the goals of the project are to get more Native students to compete at the National Science Bowl, held in Washington, DC.« less

  1. A Qualitative Evaluation of the Use of Multimedia Case Studies in an Introductory Engineering Course at Two Southeastern Universities

    ERIC Educational Resources Information Center

    Huett, Kim C.; Kawulich, Barbara

    2015-01-01

    Collaborating at two universities to improve teaching and learning in undergraduate engineering, an interdisciplinary team of researchers, instructors, and evaluators planned and implemented the use of multimedia case studies with students enrolled in an introductory engineering course. This qualitative action evaluation study focuses on results…

  2. A Multi- and Cross-Disciplinary Capstone Experience in Engineering Art: Animatronic Polar Bear

    ERIC Educational Resources Information Center

    Sirinterlikci, Arif; Toukonen, Kayne; Mason, Steve; Madison, Russel

    2005-01-01

    An animatronic robot was designed and constructed for the 2003 Annual Student Robotic Technology and Engineering Challenge organized by the Robotics International (RI) association of the Society of Manufacturing Engineers (SME). It was also the senior capstone design project for two of the design team members. After a thorough study of body and…

  3. Constructing an Engineering Model for Raising an Egyptian Obelisk

    ERIC Educational Resources Information Center

    Beck, Charles R.

    2009-01-01

    One of the greatest mysteries of ancient times is how the Egyptians managed to raise huge obelisks using very simple technology. This remarkable task has puzzled engineers for thousand of years. After failing to raise an obelisk with simple machines, such as levers and pulleys, a team of modern engineers solved the mystery using a sandpit and the…

  4. Engineering as a Social Activity: Preparing Engineers to Thrive in the Changing World of Work

    ERIC Educational Resources Information Center

    Joyner, Fredricka F.; Mann, Derek T. Y.; Harris, Todd

    2012-01-01

    Key macro-trends are combining to create a new work context for the practice of engineering. Telecommuting and virtual teams create myriad possibilities and challenges related to managing work and workers. Social network technology tools allow for unprecedented global, 24/7 collaboration. Globalization has created hyper-diverse organizations,…

  5. Social Work and Engineering Collaboration: Forging Innovative Global Community Development Education

    ERIC Educational Resources Information Center

    Gilbert, Dorie J.

    2014-01-01

    Interdisciplinary programs in schools of social work are growing in scope and number. This article reports on collaboration between a school of social work and a school of engineering, which is forging a new area of interdisciplinary education. The program engages social work students working alongside engineering students in a team approach to…

  6. Shaping Software Engineering Curricula Using Open Source Communities: A Case Study

    ERIC Educational Resources Information Center

    Bowring, James; Burke, Quinn

    2016-01-01

    This paper documents four years of a novel approach to teaching a two-course sequence in software engineering as part of the ABET-accredited computer science curriculum at the College of Charleston. This approach is team-based and centers on learning software engineering in the context of open source software projects. In the first course, teams…

  7. Optimal design of a combustion chamber of gas turbine engine by a Combustion chamber 1D-2D computer program

    NASA Astrophysics Data System (ADS)

    Aleksandrov, Y. B.; Mingazov, B. G.

    2017-09-01

    The paper shows a method of modeling and optimization of processes in combustion chambers of gas turbine engines using a computer program developed by a team at the Department of Jet Engines and Power Plants (DJEPP) of Technical University named after A N Tupolev KNRTU-KAI.

  8. Effectiveness of Three Case Studies and Associated Teamwork in Stimulating Freshman Interest in an Introduction to Engineering Course

    ERIC Educational Resources Information Center

    McIntyre, Joseph S.

    2011-01-01

    The effectiveness of three case studies and associated teamwork to stimulate interest of college freshman in engineering was investigated by observing students. Case studies were assigned as laboratory team exercises in an introduction to engineering course at Auburn University. Student interest in the case studies was evaluated qualitatively…

  9. 18. VIEW LOOKING FORWARD FROM ENGINE ROOM INTO GALLEY. STARBOARD ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. VIEW LOOKING FORWARD FROM ENGINE ROOM INTO GALLEY. STARBOARD ENGINE, FUEL TANK AND BATTERIES SHOWN IN RIGHT SIDE OF IMAGE. OIL-FIRED GALLEY STOVE AND FORWARD COMPANIONWAY LADDER IS IN VIEW THROUGH DOORWAY BEYOND. (HAER FIELD TEAM MEMBER CHRISTOPHER CYZEWSKI IN GALLEY) - Pilot Schooner "Alabama", Moored in harbor at Vineyard Haven, Vineyard Haven, Dukes County, MA

  10. A Genuine TEAM Player

    NASA Technical Reports Server (NTRS)

    2001-01-01

    Qualtech Systems, Inc. developed a complete software system with capabilities of multisignal modeling, diagnostic analysis, run-time diagnostic operations, and intelligent interactive reasoners. Commercially available as the TEAMS (Testability Engineering and Maintenance System) tool set, the software can be used to reveal unanticipated system failures. The TEAMS software package is broken down into four companion tools: TEAMS-RT, TEAMATE, TEAMS-KB, and TEAMS-RDS. TEAMS-RT identifies good, bad, and suspect components in the system in real-time. It reports system health results from onboard tests, and detects and isolates failures within the system, allowing for rapid fault isolation. TEAMATE takes over from where TEAMS-RT left off by intelligently guiding the maintenance technician through the troubleshooting procedure, repair actions, and operational checkout. TEAMS-KB serves as a model management and collection tool. TEAMS-RDS (TEAMS-Remote Diagnostic Server) has the ability to continuously assess a system and isolate any failure in that system or its components, in real time. RDS incorporates TEAMS-RT, TEAMATE, and TEAMS-KB in a large-scale server architecture capable of providing advanced diagnostic and maintenance functions over a network, such as the Internet, with a web browser user interface.

  11. The shuttle main engine: A first look

    NASA Technical Reports Server (NTRS)

    Schreur, Barbara

    1996-01-01

    Anyone entering the Space Shuttle Main Engine (SSME) team attends a two week course to become familiar with the design and workings of the engine. This course provides intensive coverage of the individual hardware items and their functions. Some individuals, particularly those involved with software maintenance and development, have felt overwhelmed by this volume of material and their lack of a logical framework in which to place it. To provide this logical framework, it was decided that a brief self-taught introduction to the overall operation of the SSME should be designed. To aid the people or new team members with an interest in the software, this new course should also explain the structure and functioning of the controller and its software. This paper presents a description of this presentation.

  12. Large-Scale Digital Geologic Map Databases and Reports of the North Coal District in Afghanistan

    USGS Publications Warehouse

    Hare, Trent M.; Davis, Philip A.; Nigh, Devon; Skinner, James A.; SanFilipo, John R.; Bolm, Karen S.; Fortezzo, Corey M.; Galuszka, Donna; Stettner, William R.; Sultani, Shafiqullah; Nader, Billal

    2008-01-01

    This report describes the Afghanistan coal resource maps and associated databases that have been digitally captured and maps that have been thus far converted to GIS databases. Several maps by V/O Technoexport, USSR (VOTU) and Bundesanstalt fur Bodenforschung (BGR), Hannover, Germany, are captured here. Most of the historical coal exploration is concentrated in north-central Afghanistan, a region referred to as the 'North Coal District', and almost all of the coal-related maps found Afghanistan Geological Survey (AGS) archives to date cover various locations within that district as shown in the index map. Most of the maps included herein were originally scanned during U.S. Geological Survey (USGS) site visits to Kabul in November 2004 and February 2006. The scanning was performed using equipment purchased by U.S. Agency for International Development (USAID) and U.S. Trade and Development Agency (USTDA) and installed at the AGS by USGS. Many of these maps and associated reports exist as single unpublished copies in the AGS archives, so these efforts served not only to provide a basis for digital capturing, but also as a means for preserving these rare geologic maps and reports. The data included herein represent most of the coal-related reports and maps that are available in the AGS archives. This report excludes the limited cases when a significant portion of a report's text could not be located, but it does not exclude reports with missing plates. The vector files are released using the Environmental Systems Research Institute (ESRI) Personal Geodatabase, ESRI shapefile vector format, and the open Geography Markup Language (GML) format. Scanned images are available in JPEG and, when rectified, GeoTIFF format. The authors wish to acknowledge the contributions made by the staff of the AGS Records and Coal Departments whose valuable assistance made it possible to locate and catalogue the data provided herein. We especially acknowledge the efforts of particular members of the coal team: Engineer Saifuddin Aminy (Team Leader); Engineer Gul Pacha Azizi; Engineer Abdul Haq Barakati; Engineer Abdul Basir; Engineer Mohammad Daoud; Engineer Abdullah Ebadi; Engineer Abdul Ahad Omaid; Engineer Spozmy; and Engineer Shapary Tokhi. The ongoing efforts of Engineer Mir M. Atiq Kazimi (Team leader); Engineer M. Anwar Housinzada; and Engineer Shereen Agha of the AGS Records Department to organize and catalogue the AGS material were invaluable in locating and preserving these data. The efforts of the entire AGS staff to personally preserve these data during war time, in the absence of virtually any supporting infrastructure, was truly remarkable. The efforts by the British Geological Survey (BGS) to assist the AGS in archiving these data, and the personal assistance provided by BGS (notably Robert McIntosh), to the USGS teams were also appreciated. The logistical support provided by the U.S. Embassy in Kabul, particularly the Afghanistan Reconstruction Group, was critical to the success of the USGS teams while in Afghanistan. Finally, the efforts of the Minister of the Ministry of Mines and Industries (M. Ibrahim Adel) to support the USGS coal resource assessment in Afghanistan, in both his current and former role as President of the Mines Affairs Department was vital to this effort.

  13. Clinical effect of a multidisciplinary team approach to the initial treatment of patients with hospital-acquired bloodstream infections at a Japanese university hospital.

    PubMed

    Tsukamoto, Hitoshi; Higashi, Takashi; Nakamura, Toshiaki; Yano, Ryoichi; Hida, Yukio; Muroi, Yoko; Ikegaya, Satoshi; Iwasaki, Hiromichi; Masada, Mikio

    2014-09-01

    Hospital-acquired bloodstream infections (BSIs) are significant causes of mortality, and strategies to improve outcomes are needed. We aimed to evaluate the clinical efficacy of a multidisciplinary infection control team (ICT) approach to the initial treatment of patients with hospital-acquired BSI. A before-after quasiexperimental study of patients with hospital-acquired BSI was performed in a Japanese university hospital. The ICT provided immediate recommendations to the attending physician about appropriate antimicrobial therapy and management after reviewing blood cultures, Gram's stain, final organism, and antimicrobial susceptibility results. The sample included 469 patients with hospital-acquired BSI (n = 210, preintervention group; n = 259, postintervention group). There were no significant differences between the groups in background or microbiologic characteristics. The 30-day mortality was significantly lower and significantly more patients received appropriate antimicrobial therapy in the postintervention group (22.9% vs 14.3%; P = .02 and 86.5% vs 69.0%; P < .001, respectively). Multivariate analysis confirmed that the ICT intervention was significantly associated with appropriate antimicrobial therapy (odds ratio, 2.22; 95% confidence interval, 1.27-3.89) and 30-day mortality (odds ratio, 0.49; 95% confidence interval, 0.25-0.95). A timely multidisciplinary team approach decreases the delay of appropriate antimicrobial treatment and may improve HABSI patient outcomes. Copyright © 2014 Association for Professionals in Infection Control and Epidemiology, Inc. Published by Mosby, Inc. All rights reserved.

  14. Marshall Team Fires Recreated Goddard Rocket

    NASA Technical Reports Server (NTRS)

    2003-01-01

    In honor of the Centernial of Flight Celebration and commissioned by the American Institute of Aeronautics and Astronautics (AIAA), a team of engineers from Marshall Space Flight Center (MSFC) built a replica of the first liquid-fueled rocket. The original rocket, designed and built by rocket engineering pioneer Robert H. Goddard in 1926, opened the door to modern rocketry. Goddard's rocket reached an altitude of 41 feet while its flight lasted only 2.5 seconds. The Marshall design team's plan was to stay as close as possible to an authentic reconstruction of Goddard's rocket. The same propellants were used - liquid oxygen and gasoline - as available during Goddard's initial testing and firing. The team also tried to construct the replica using the original materials and design to the greatest extent possible. By purposely using less advanced techniques and materials than many that are available today, the team encountered numerous technical challenges in testing the functional hardware. There were no original blueprints or drawings, only photographs and notes. However, this faithful adherence to historical accuracy has allowed the team to experience many of the same challenges Goddard faced 77 years ago, and more fully appreciate the genius of this extraordinary man. In this photo, the replica is shown firing in the A-frame launch stand in near-flight configuration at MSFC's Test Area 116 during the American Institute of Aeronautics and Astronautics 39th Joint Propulsion Conference on July 23, 2003.

  15. Alpbach Summer School - a unique learning experience

    NASA Astrophysics Data System (ADS)

    Kern, K.; Aulinas, J.; Clifford, D.; Krejci, D.; Topham, R.

    2011-12-01

    The Alpbach Summer School is a ten-day program that provides a unique opportunity for young european science and engineering students, both undergraduate and graduate, to learn how to approach the entire design process of a space mission. The theme of the 2010 Summer School was "New Space Missions to Understand Climate Change", a current, challenging, very broad and complex topic. The program was established more than 35 years ago and is organised in two interrelated parts: a series of lectures held by renowned experts in the field (in the case of this specific year, climate change and space engineering experts) that provides a technical and scientific background for the workshops that follow, the core of the Summer School. For the workshops the students are split into four international, interdisciplinary teams of about 15 students. In 2010 every team had to complete a number of tasks, four in total: (1) identify climate change research gaps and design a space mission that has not yet been flown or proposed, (2) define the science objectives and requirements of the mission, (3) design a spacecraft that meets the mission requirements, which includes spacecraft design and construction, payload definition, orbit calculations, but also the satellite launch, operation and mission costs and (4) write up a short mission proposal and present the results to an expert review panel. Achieving these tasks in only a few days in a multicultural, interdisciplinary team represents a major challenge for all participants and provides an excellent practical learning experience. Over the course of the program, students do not just learn facts about climate change and space engineering, but scientists also learn from engineers and engineers from scientists. The participants have to deepen their knowledge in an often unfamiliar field, develop organisational and team-work skills and work under pressure. Moreover, teams are supported by team and roving tutors and get the opportunity to meet and learn from international experts. This presentation will provide an overview of the Alpbach Summer School program from a student's perspective. The different stages of this unique and enriching experience will be covered. Special attention will be paid to the workshops, which, as mentioned above, are the core of the Alpbach Summer School. During these intense workshops, participants work towards the proposed goals resulting in the design proposal of a space mission. The Alpbach Summer School is organised by FFG and co-sponsored by ESA, ISSI and the national space authorities of ESA member and cooperating states.

  16. New Tool Released for Engine-Airframe Blade-Out Structural Simulations

    NASA Technical Reports Server (NTRS)

    Lawrence, Charles

    2004-01-01

    Researchers at the NASA Glenn Research Center have enhanced a general-purpose finite element code, NASTRAN, for engine-airframe structural simulations during steady-state and transient operating conditions. For steady-state simulations, the code can predict critical operating speeds, natural modes of vibration, and forced response (e.g., cabin noise and component fatigue). The code can be used to perform static analysis to predict engine-airframe response and component stresses due to maneuver loads. For transient response, the simulation code can be used to predict response due to bladeoff events and subsequent engine shutdown and windmilling conditions. In addition, the code can be used as a pretest analysis tool to predict the results of the bladeout test required for FAA certification of new and derivative aircraft engines. Before the present analysis code was developed, all the major aircraft engine and airframe manufacturers in the United States and overseas were performing similar types of analyses to ensure the structural integrity of engine-airframe systems. Although there were many similarities among the analysis procedures, each manufacturer was developing and maintaining its own structural analysis capabilities independently. This situation led to high software development and maintenance costs, complications with manufacturers exchanging models and results, and limitations in predicting the structural response to the desired degree of accuracy. An industry-NASA team was formed to overcome these problems by developing a common analysis tool that would satisfy all the structural analysis needs of the industry and that would be available and supported by a commercial software vendor so that the team members would be relieved of maintenance and development responsibilities. Input from all the team members was used to ensure that everyone's requirements were satisfied and that the best technology was incorporated into the code. Furthermore, because the code would be distributed by a commercial software vendor, it would be more readily available to engine and airframe manufacturers, as well as to nonaircraft companies that did not previously have access to this capability.

  17. Effects of teacher assistance teams on special education referrals in elementary schools.

    PubMed

    Short, R J; Talley, R C

    1996-12-01

    School-based problem-solving teams recently have received much attention as a possible support for children who are at risk for school failure and for over-referral to special education. However, no controlled studies of the effects of such teams on numbers of referrals for special education or for proportion of appropriate referrals for special education have been conducted. The lack of adequate research concerning school-based problem-solving teams, coupled with the widespread promotion of their use, suggests that further study of such teams is important. In this study, we investigated the effect of one team model, Teacher Assistance Teams, on special education referrals in elementary schools of a large urban district. To address limitations of previous research, schools with such teams were compared with those without across several years of implementation. Analysis yielded a significant decrease in referrals in both groups of schools but no significant differences between groups. These findings may be explained by the context in which both groups of schools functioned.

  18. Teaching introductory game development with unreal engine: Challenges, strategies, and experiences

    NASA Astrophysics Data System (ADS)

    Head, Nicholas A.

    From the days of Pong to 100 million dollar projects such as the Grand Theft Auto franchise, video games have evolved significantly over the years. This evolution has also changed the way game development is viewed as a career. Today, video games are one of the most profitable forms of entertainment, and game development courses are appearing at universities around the world. Even with this growth, a degree from a university has yet to be an important factor in finding a job in game development (Owen, 2013). This thesis examines a method of creating and implementing an introductory gaming course and recommends ways to improve the curriculum. The main focus of the course was to introduce game development to the students. Each week, they were given an exercise that covered a different topic. Students also took part in a team project in which they were tasked with creating a complete game. The goal of the team projects was to expand the student's basic knowledge given to them from the exercises. Data was gathered on the students' subjective experiences with the class. This data and the class's overall performance were compared with past iterations of the course. New to the course was the Unreal Engine. Students used the latest version of the engine, Unreal Engine 4, to complete exercises. Not all students chose to use this engine for the team project. Instructor and students experiences with the engine were also recorded. While there were some problems implementing the engine within our lab environment, we were still able to execute the overall lesson plan. Even with the engine issues, the course had overall good performance. CGT 241, Introduction to 3D Animation, was shown to help the students to complete the course while CGT 215, Computer Graphics Programming I, did not provide enough information on game programming. Exercises were found to be helpful but students wanted a better understanding of how these skills can be applied to game development. Team projects also went well with most teams creating a functional project. Students wanted more time to complete projects along with a structured approach to the project. Confidence in game development and the Unreal Engine were not high but students were enthusiastic in continuing in the field of game development. Recommendations were made to the curriculum in order to fix some of the issues with the introductory course and help students find a career. In order to fix the gap between the programming course and the introductory game course, a video game programming course was recommended that focused on teaching students how code works with video game engines. An option to specialize was also recommended in order to see a higher level of understanding on game concepts and a higher level of quality of game projects. Changes to the higher courses were also made for a yearlong course where students would focus on a single project to publish. This would expand on the introductory course while also replicating the game development process.

  19. An Interprofessional Model for Serving Youth at Risk for Substance Abuse: The Team Case Study.

    ERIC Educational Resources Information Center

    Cobia, Debra C.; And Others

    1995-01-01

    Three models of interprofessional education appropriate for serving youth at risk for substance abuse are described. The evaluation of the team case study model indicated that the participants were more sensitive to the needs of the youths, experienced increased comfort in consulting other agents, and were more confident in their ability to select…

  20. Demonstrating appropriate silviculture for sustainable forestry in central Siberia: a Russian - American partnership

    Treesearch

    J. C. Brissette; S. T. Eubanks; A. J. R. Gillespie; R. J. Lasko; A. V. Rykoff

    1997-01-01

    A joint Northeastern Forest Experiment Station - Eastern Region team is working with Russian counterparts on a Forests for the Future Initiative in the Krasnoyarsk region of central Siberia. Russian team members include scientists from the Sukachev Institute of the Russian Academy of Sciences, managers from a number of units of the Federal Forest Service of Russia, and...

Top