7 CFR 1717.604 - Long-range engineering plans and construction work plans.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 11 2010-01-01 2010-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...
7 CFR 1717.604 - Long-range engineering plans and construction work plans.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 11 2013-01-01 2013-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...
7 CFR 1717.604 - Long-range engineering plans and construction work plans.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 11 2014-01-01 2014-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...
7 CFR 1717.604 - Long-range engineering plans and construction work plans.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 11 2012-01-01 2012-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...
7 CFR 1717.604 - Long-range engineering plans and construction work plans.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 11 2011-01-01 2011-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...
ERIC Educational Resources Information Center
Ontario Council on Graduate Studies, Toronto. Advisory Committee on Academic Planning.
On the instruction of the Council of Ontario Universities, the Advisory Committee on Academic Planning in cooperation with the Committee of Ontario Deans of Engineering has conducted a planning assessment for doctoral work in industrial engineering and systems design. Recommendations for doctoral work in engineering studies are presented.…
A Working Plan for Treating the Engineering Faculty Shortage Problem.
ERIC Educational Resources Information Center
Shoup, Terry E., Ed.
In view of the consequences of the engineering faculty shortage problem on engineering capabilities in the future in the United States, a working plan which will serve as a national agenda for prompt action has been developed. This plan involves the three key groups (federal government, academic community, industry) who have the vision,…
Code of Federal Regulations, 2012 CFR
2012-07-01
... will include full description of planned work, plans, sketches, and similar engineering data and... engineering adequacy of the local proposal and its relation to the possible selected Federal Plan and... Engineers—of the Assistant Secretary of the Army (Civil Works) by forwarding a copy of the draft survey...
Code of Federal Regulations, 2011 CFR
2011-07-01
... will include full description of planned work, plans, sketches, and similar engineering data and... engineering adequacy of the local proposal and its relation to the possible selected Federal Plan and... Engineers—of the Assistant Secretary of the Army (Civil Works) by forwarding a copy of the draft survey...
Code of Federal Regulations, 2013 CFR
2013-07-01
... will include full description of planned work, plans, sketches, and similar engineering data and... engineering adequacy of the local proposal and its relation to the possible selected Federal Plan and... Engineers—of the Assistant Secretary of the Army (Civil Works) by forwarding a copy of the draft survey...
Code of Federal Regulations, 2014 CFR
2014-07-01
... will include full description of planned work, plans, sketches, and similar engineering data and... engineering adequacy of the local proposal and its relation to the possible selected Federal Plan and... Engineers—of the Assistant Secretary of the Army (Civil Works) by forwarding a copy of the draft survey...
Code of Federal Regulations, 2010 CFR
2010-07-01
... will include full description of planned work, plans, sketches, and similar engineering data and... engineering adequacy of the local proposal and its relation to the possible selected Federal Plan and... Engineers—of the Assistant Secretary of the Army (Civil Works) by forwarding a copy of the draft survey...
Software Engineering Improvement Activities/Plan
NASA Technical Reports Server (NTRS)
2003-01-01
bd Systems personnel accomplished the technical responsibilities for this reporting period, as planned. A close working relationship was maintained with personnel of the MSFC Avionics Department Software Group (ED14). Work accomplishments included development, evaluation, and enhancement of a software cost model, performing literature search and evaluation of software tools available for code analysis and requirements analysis, and participating in other relevant software engineering activities. Monthly reports were submitted. This support was provided to the Flight Software Group/ED 1 4 in accomplishing the software engineering improvement engineering activities of the Marshall Space Flight Center (MSFC) Software Engineering Improvement Plan.
Code of Federal Regulations, 2011 CFR
2011-01-01
..., and retirements. The primary components of the system consist of long-range engineering plans, construction work plans (CWPs), CWP amendments, and special engineering and cost studies. Long range engineering plans identify plant investments required over a period of 10 years or more. CWPs specify and...
Code of Federal Regulations, 2013 CFR
2013-01-01
..., and retirements. The primary components of the system consist of long-range engineering plans, construction work plans (CWPs), CWP amendments, and special engineering and cost studies. Long range engineering plans identify plant investments required over a period of 10 years or more. CWPs specify and...
Code of Federal Regulations, 2012 CFR
2012-01-01
..., and retirements. The primary components of the system consist of long-range engineering plans, construction work plans (CWPs), CWP amendments, and special engineering and cost studies. Long range engineering plans identify plant investments required over a period of 10 years or more. CWPs specify and...
Code of Federal Regulations, 2014 CFR
2014-01-01
..., and retirements. The primary components of the system consist of long-range engineering plans, construction work plans (CWPs), CWP amendments, and special engineering and cost studies. Long range engineering plans identify plant investments required over a period of 10 years or more. CWPs specify and...
ERIC Educational Resources Information Center
Ontario Council on Graduate Studies, Toronto. Advisory Committee on Academic Planning.
On the instruction of the Council of Ontario Universities, the Advisory Committee on Academic Planning in cooperation with the Committee of Ontario Deans of Engineering has conducted a planning assessment for doctoral work in mechanical engineering. This report presents as overview of the recommendations for each of the assessments conducted in…
Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2
DOE Office of Scientific and Technical Information (OSTI.GOV)
GRYGIEL, M.L.
1998-10-08
Manage the Site Systems Engineering process to provide a traceable integrated requirements-driven, and technically defensible baseline. Through the Site Integration Group(SIG), Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the RL Project Managers, the Project Direction Office and with the Project Major Subcontractors, as well as with the Site Planning organization. Systems Implementation: (1) Develops, maintains, and controls the site integrated technical baseline, ensures the Systems Engineering interfaces between projects are documented, and maintain the Site Environmental Management Specification. (2) Develops and uses dynamic simulation models for verification of the baselinemore » and analysis of alternatives. (3) Performs and documents fictional and requirements analyses. (4) Works with projects, technology management, and the SIG to identify and resolve technical issues. (5) Supports technical baseline information for the planning and budgeting of the Accelerated Cleanup Plan, Multi-Year Work Plans, Project Baseline Summaries as well as performance measure reporting. (6) Works with projects to ensure the quality of data in the technical baseline. (7) Develops, maintains and implements the site configuration management system.« less
Engineering Task Plan for the Ultrasonic Inspection of Hanford Double Shell Tanks (DST) FY2000
DOE Office of Scientific and Technical Information (OSTI.GOV)
JENSEN, C.E.
2000-01-10
This document facilitates the ultrasonic examination of Hanford double-shell tanks. Included are a plan for engineering activities (individual responsibilities), plan for performance demonstration testing, and a plan for field activities (tank inspection). Also included are a Statement of Work for contractor performance of the work and a protocol to be followed should tank flaws that exceed the acceptance criteria be discovered.
Code of Federal Regulations, 2010 CFR
2010-01-01
... accept the certification only for matters within the staff engineer's area of specialization. In such... certification coordinator. (b) Certification borrowers, shall submit and obtain RUS approval of a work plan before construction and related engineering begin. (1) The work plan shall provide a description of the...
Code of Federal Regulations, 2010 CFR
2010-01-01
.... (i) A borrower's CWP or special engineering studies must be supported by a Borrower's Environmental..., and retirements. The primary components of the system consist of long-range engineering plans, construction work plans (CWPs), CWP amendments, and special engineering and cost studies. Long range...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Clifford, David J.; Harris, James M.
2014-12-01
This is the IDC Re-Engineering Phase 2 project Integrated Master Plan (IMP). The IMP presents the major accomplishments planned over time to re-engineer the IDC system. The IMP and the associate Integrated Master Schedule (IMS) are used for planning, scheduling, executing, and tracking the project technical work efforts. REVISIONS Version Date Author/Team Revision Description Authorized by V1.0 12/2014 IDC Re- engineering Project Team Initial delivery M. Harris
The paper discusses the Environmental Protection Agency's (EPA) Air and Energy Engineering Research Laboratory (AEERL) research plan for work in the global climate area. The plan, written for discussion with senior scientists and program managers at EPA's Global Climate Change Re...
STEM Teachers' Planned and Enacted Attempts at Implementing Engineering Design-Based Instruction
ERIC Educational Resources Information Center
Capobianco, Brenda M.; Rupp, Madeline
2014-01-01
This study investigates grades 5 and 6 science, technology, engineering, and mathematics (STEM) teachers' planned and actualized engineering design-based instruction, the instruments used to characterize their efforts, and the implications this work has for teachers' implementations of an integrated approach to STEM education.…
34. PLAN, PROPOSED EXTENSION OF COAL HOUSE, EXTENSIONS OF ENGINE ...
34. PLAN, PROPOSED EXTENSION OF COAL HOUSE, EXTENSIONS OF ENGINE AND COAL HOUSES, DEER ISLAND PUMPING STATION, METROPOLITAN WATER AND SEWERAGE BOARD, METROPOLITAN SEWARAGE WORKS, JANUARY 1909, SHEET NO. 11. Aperture card 6498-11. - Deer Island Pumping Station, Boston, Suffolk County, MA
Breaching the Phalanx: Developing a More Engineer-Centric Modular BCT
2007-06-05
Obersturmbannfuehrer Jaochim Peiper’s Kampfgruppe Peiper (of the I SS Panzer Corps).42 The 1111th Engineer commander visualized a defensive scheme for the...the engineer planner scheduled a planning session with the I MEF engineer staff. This planning session was held at Camp Pendleton in September...covered sleeping /work areas, ammo storage, etc.). As the units did not begin the invasion until 20 March, this meant the BCTs lived in abject squalor
Work plan for cone penetrometer comparison testing.
DOT National Transportation Integrated Search
2011-01-01
The work plan and experimental design are developed around aiding engineers and geologists within the : Wisconsin Department of Transportation to understand the mechanisms controlling cone penetration test : results so that they can decide when the t...
Manufacturing engineering: Principles for optimization
NASA Astrophysics Data System (ADS)
Koenig, Daniel T.
Various subjects in the area of manufacturing engineering are addressed. The topics considered include: manufacturing engineering organization concepts and management techniques, factory capacity and loading techniques, capital equipment programs, machine tool and equipment selection and implementation, producibility engineering, methods, planning and work management, and process control engineering in job shops. Also discussed are: maintenance engineering, numerical control of machine tools, fundamentals of computer-aided design/computer-aided manufacture, computer-aided process planning and data collection, group technology basis for plant layout, environmental control and safety, and the Integrated Productivity Improvement Program.
2011-02-11
on TF39 engines, which are typically used for C-5 Galaxy aircraft; T56 engines, which are typically used for C-130 aircraft; and fuel accessories on...conducting separate cost-benefit analyses for the TF39 and T56 engine maintenance work. Under Air Force guidance for depot-level source-of-repair selection...Force has not developed specific risk mitigation plans for the TF39 or T56 engines because it is still assessing how the work will be performed
Applying the Theory of Constraints to a Base Civil Engineering Operations Branch
1991-09-01
Figure Page 1. Typical Work Order Processing . .......... 7 2. Typical Job Order Processing . .......... 8 3. Typical Simplified In-Service Work Plan for...Customers’ Customer Request Service Planning Unit Production] Control Center Material Control Scheduling CE Shops Figure 1.. Typical Work Order Processing 7
Core and Off-Core Processes in Systems Engineering
NASA Technical Reports Server (NTRS)
Breidenthal, Julian; Forsberg, Kevin
2010-01-01
An emerging methodology of organizing systems-engineering plans is based on a concept of core and off-core processes or activities. This concept has emerged as a result of recognition of a risk in the traditional representation of systems-engineering plans by a Vee model alone, according to which a large system is decomposed into levels of smaller subsystems, then integrated through levels of increasing scope until the full system is constructed. Actual systems-engineering activity is more complicated, raising the possibility that the staff will become confused in the absence of plans which explain the nature and ordering of work beyond the traditional Vee model.
USEPA Region 6 and the US Army Corps of Engineers submit for public comment the Draft Site Management and Monitoring Plan for Corpus Christi Maintenance and New Work Ocean Dredged Material Disposal Site
Becoming an effective clinical engineering or biomedical technology manager.
Brush, L C
1992-01-01
The BMET or CE Supervisor is a technical manager who is close to the actual work of a biomedical or clinical engineering department. The MPTI is a management training tool that has identified differences between the effective and less-effective technical managers. These behaviors or styles can be considered and applied to the clinical engineering and BMET work environments. Effective BMET or CE Supervisors have a management identity. They are both people-oriented and task-oriented. They are good problem-solvers, and will plan and structure the work tasks and environment. When the situation requires a change in plans, however, they can adapt to the new situation easily. If a decision needs to be made that affects the organization, they will check with higher management or peer managers. Less-effective BMET or CE Supervisors will make important decisions alone, without checking with others. They plan and structure tasks and the work environment, but they are less willing to change when faced with a new situation. They are not people-oriented, and their ability to assess social situations is low. Their need for achievement recognition is often too high. The work environment has an effect on how the competence of a manager is perceived. A "one-desk manager" in a small, one-person biomedical engineering department has more autonomy than a CE Supervisor in a large department. Working for a medical device manufacturing firm often requires a greater management identity. An engineering consultant is often a managing specialist, rather than a traditional manager.(ABSTRACT TRUNCATED AT 250 WORDS)
Differences in Thinking Styles of Artists and Engineers
ERIC Educational Resources Information Center
Gridley, Mark C.
2007-01-01
Seventy-one professional fine artists and 147 engineers completed Sternberg's Intellectual Styles Questionnaire (R. J. Sternberg & R. K. Wagner, 1991). Artists preferred less external input in their work than engineers preferred, and engineers were more inclined to prioritize their thinking. Artists preferred devising their own plans significantly…
2016-12-01
Nonfederal Sponsors Why GAO Did This Study Through its Civil Works program, the Corps designs , constructs, and maintains federal water resources...Public Works United States Senate Dear Mr. Chairman: The U.S. Army Corps of Engineers (Corps) is the world’s largest public engineering, design ...its Civil Works Program, in general, the Corps plans, designs , constructs, operates, and maintains a wide range of water resources projects. Congress
Issues in NASA Program and Project Management: Focus on Project Planning and Scheduling
NASA Technical Reports Server (NTRS)
Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)
1997-01-01
Topics addressed include: Planning and scheduling training for working project teams at NASA, overview of project planning and scheduling workshops, project planning at NASA, new approaches to systems engineering, software reliability assessment, and software reuse in wind tunnel control systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...
Code of Federal Regulations, 2014 CFR
2014-10-01
... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...
Code of Federal Regulations, 2013 CFR
2013-10-01
... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...
Code of Federal Regulations, 2012 CFR
2012-10-01
... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...
Center Planning and Development Student Engineer at KSC
NASA Technical Reports Server (NTRS)
Jenkins, Kenneth T., Jr.
2015-01-01
This summer I was the Student Trainee (Engineering) Pathways Intern (co-op) at the Kennedy Space Center (KSC) in the Center Planning & Development (CPD) Directorate. CPD works with commercial companies who are interested in using KSC's unique capabilities for spaceflight, spacecraft processing, ground systems and Research & Development (R&D) projects that fall in line with NASA's Mission and Vision. CPD is divided into three (3) groups: (1) AD-A, which works on the Master Planning for the center, (2) AD-B (where I am), which works on project control, management and integration, and (3) AD-C, which works on partnership development. CPD's main goal is to make KSC the world's preeminent multi-user spaceport and maintain the center as a leader in space exploration. CPD is a very diverse group of employees having a wide knowledge of not only the Space Shuttle, but also Expendable Launch Vehicles (ELV). The director of CPD, Scott Colloredo, is on the advisory board for Commercial Space Operations (CSO) and has a degree from ERAU. I worked on a number of different tasks for AD-B, as well as CPD, that includes, but not limited to: reviewing and reissuing engineering documents, weekly notes for CPD and senior management, engineering familiarizations with facilities at KSC, leading a tour for the Embry-Riddle Aeronautical University Career Services office, and working on actual agreements/proposals that will be used in the partnership process with multiple partners, along with other projects. Most of the work I have done is sensitive information and cannot be disclosed.
7 CFR 1710.253 - Engineering and cost studies-addition of generation capacity.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 11 2014-01-01 2014-01-01 false Engineering and cost studies-addition of generation... TO ELECTRIC LOANS AND GUARANTEES Construction Work Plans and Related Studies § 1710.253 Engineering... engineering and cost studies as specified by RUS. The studies shall cover a period from the beginning of the...
7 CFR 1710.253 - Engineering and cost studies-addition of generation capacity.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 11 2012-01-01 2012-01-01 false Engineering and cost studies-addition of generation... TO ELECTRIC LOANS AND GUARANTEES Construction Work Plans and Related Studies § 1710.253 Engineering... engineering and cost studies as specified by RUS. The studies shall cover a period from the beginning of the...
7 CFR 1710.253 - Engineering and cost studies-addition of generation capacity.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 11 2010-01-01 2010-01-01 false Engineering and cost studies-addition of generation... TO ELECTRIC LOANS AND GUARANTEES Construction Work Plans and Related Studies § 1710.253 Engineering... engineering and cost studies as specified by RUS. The studies shall cover a period from the beginning of the...
7 CFR 1710.253 - Engineering and cost studies-addition of generation capacity.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 11 2013-01-01 2013-01-01 false Engineering and cost studies-addition of generation... TO ELECTRIC LOANS AND GUARANTEES Construction Work Plans and Related Studies § 1710.253 Engineering... engineering and cost studies as specified by RUS. The studies shall cover a period from the beginning of the...
7 CFR 1710.253 - Engineering and cost studies-addition of generation capacity.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 11 2011-01-01 2011-01-01 false Engineering and cost studies-addition of generation... TO ELECTRIC LOANS AND GUARANTEES Construction Work Plans and Related Studies § 1710.253 Engineering... engineering and cost studies as specified by RUS. The studies shall cover a period from the beginning of the...
1989-09-01
projections of planned construction, overhaul and repair work from both the public and commercial sectors can never sustain the industry at a level which...and other government organizations to support the Shipyard Recovery Plan and the revitalization of commercial shipbuilding in America. Expanding...engineer sitting next to the organization that does work package planning on ships and from the fleet. It won’t be, at least in these competitive firms
NASA Technical Reports Server (NTRS)
Yarbrough, Katherine
2015-01-01
During my internship I worked on two major projects, recommending improvements for the Center's Risk Management Workshop and helping with the strategic planning efforts for Safety and Mission Assurance (S&MA). The risk management improvements is the key project I worked on this semester through my internship, while the strategic planning is the secondary assignment. S&MA Business Office covers both aspects in its delegation, getting both spans some of the work done in the office. A risk is a future event with a negative consequence that has some probability of occurring. Safety and Mission Assurance identifies, analyzes, plans, and tracks risk. The directorate offers the Center a Risk Management Workshop, and part of the ongoing efforts of S&MA is to make continuous improvements to the RM Workshop. By using the Project Management Institute's (PMI) Standard for Risk Management, I performed a gap analysis to make improvements for our materials. I benchmarked the PMI's Risk Management Standard, compared our Risk Management Workshop materials to PMI's standard, and identified any gaps in our material. My major findings were presented to the Business Office of S&MA for a decision on whether or not to incorporate the improvements. These suggestions were made by attending JSC working group meetings, Health, Safety and Environment (HSE) panel reviews and various risk review meetings. The improvements provide better understanding of risk management processes and enhanced risk tracking knowledge and skills. Risk management is an integral part of any engineering discipline, getting exposed to this section of engineering will greatly help shape my career in the future. Johnson Space Center is a world leader in risk management processes; learning risk management here gives me a huge advantage over my peers, as well as understanding decision making in the context of risk management will help me to be a well-rounded engineer. Strategic planning is an area I had not previously studied. Helping with the strategic planning efforts in S&MA has taught me how organizations think and function as a whole. S&MA is adopting a balanced scorecard approach to strategic planning. As part of this planning method strategic themes, objectives, and initiatives are formed. I attended strategic theme team workshops that formed the strategy map for the directorate and gave shape to the plan. Also during these workshops the objectives were discussed and built. Learning the process for strategic planning has helped me better understand how organizations and businesses function, which also helps me to be a more effective employee. Other assignments I had during my internship included completing the Safety and Mission Assurance Technical Excellent Program (STEP) Level 1, as well as doing a two week rotation through the Space Exploration division in S&MA, specifically working with a thermal protection systems (TPS) engineer. While working there, I learned about the Orion capsule and the SpaceX Dragon cargo capsule. I attended meetings to prepare the engineers for the upcoming Critical Design Reviews for both capsules and reviewed test data. Learning risk management, strategic planning, and working in the Space Exploration division has taught me about many aspects of S&MA. My internship at NASA has given me new experiences and taught me numerous subjects that I would have otherwise not learned. This opportunity has expanded my educational horizons and is helping me to become a more useful engineer and employee.
32 CFR 644.82 - Prerequisites to acquisition.
Code of Federal Regulations, 2012 CFR
2012-07-01
... Report (for Army, other than Civil Works, and Air Force projects) is approved and specific authorization of the Chief of Engineers, or the appropriate Air Force Regional Civil Engineer (AFRCE), to proceed... procedures hereinafter set forth. (b) Tract description. Authority to initiate engineering planning of a...
7 CFR 1781.11 - Other considerations.
Code of Federal Regulations, 2014 CFR
2014-01-01
... treatment plants are included in watershed work plans, NRCS will not furnish engineering services for their... contract awards, spot checks of engineering inspection, and final inspection and acceptance. (b..., and financial advisor or fiscal agent. Form RD 442-19, “Agreement for Engineering Services,” may be...
32 CFR 644.82 - Prerequisites to acquisition.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Report (for Army, other than Civil Works, and Air Force projects) is approved and specific authorization of the Chief of Engineers, or the appropriate Air Force Regional Civil Engineer (AFRCE), to proceed... procedures hereinafter set forth. (b) Tract description. Authority to initiate engineering planning of a...
7 CFR 1781.11 - Other considerations.
Code of Federal Regulations, 2010 CFR
2010-01-01
... treatment plants are included in watershed work plans, NRCS will not furnish engineering services for their... contract awards, spot checks of engineering inspection, and final inspection and acceptance. (b..., and financial advisor or fiscal agent. Form RD 442-19, “Agreement for Engineering Services,” may be...
Transmission Planning Analysis Tool
DOE Office of Scientific and Technical Information (OSTI.GOV)
2015-06-23
Developed to solve specific problem: Assist transmission planning for regional transfers in interconnected power systems. This work was originated in a study for the U.S. Department of State, to recommend transmission reinforcements for the Central American regional system that interconnects 6 countries. Transmission planning analysis is currently performed by engineers with domainspecific and systemspecific knowledge without a unique methodology. The software codes of this disclosure assists engineers by defining systematic analysis procedures to help identify weak points and make decisions on transmission planning of regional interconnected power systems. Transmission Planning Analysis Tool groups PSS/E results of multiple AC contingency analysismore » and voltage stability analysis and QV analysis of many scenarios of study and arrange them in a systematic way to aid power system planning engineers or transmission operators in effective decision]making process or in the off]line study environment.« less
7 CFR 1710.205 - Minimum approval requirements for all load forecasts.
Code of Federal Regulations, 2013 CFR
2013-01-01
... electronically to RUS computer software applications. RUS will evaluate borrower load forecasts for readability...'s engineering planning documents, such as the construction work plan, incorporate consumer and usage...
7 CFR 1710.205 - Minimum approval requirements for all load forecasts.
Code of Federal Regulations, 2011 CFR
2011-01-01
... electronically to RUS computer software applications. RUS will evaluate borrower load forecasts for readability...'s engineering planning documents, such as the construction work plan, incorporate consumer and usage...
7 CFR 1710.205 - Minimum approval requirements for all load forecasts.
Code of Federal Regulations, 2012 CFR
2012-01-01
... electronically to RUS computer software applications. RUS will evaluate borrower load forecasts for readability...'s engineering planning documents, such as the construction work plan, incorporate consumer and usage...
36 CFR 327.30 - Shoreline Management on Civil Works Projects.
Code of Federal Regulations, 2010 CFR
2010-07-01
... ADMINISTERED BY THE CHIEF OF ENGINEERS § 327.30 Shoreline Management on Civil Works Projects. (a) Purpose. The... this regulation, shoreline management plans are not required for those projects where construction was... approval, one copy of each project Shoreline Management Plan will be forwarded to HQUSACE (CECW-ON) WASH DC...
Civil Engineering Work Information Management System (WIMS) Planning Guide,
1985-04-01
WORK INFORMATION MANAGEMENT SYSTEM PLANNING GUIDE l-!O L~ JAUG 0)12 13 "’ ’’’ " " 5 7 2 2 0 0 9 W WTVF--- DISCLAIMER The views and conclusions...y CHAPTER PAGE I INTRODUCTION What is WIMS? --------------------------------- 1I Why Do We Need A WIMS Planning Guide? ------------ I The Target...Administrator ------------------ 21 6 EQUIPMENT AND SUPPLIES Introduction ------------------------------- 22 Magnetic Media Supplies
29 CFR 1952.107 - Changes to approved plans.
Code of Federal Regulations, 2010 CFR
2010-07-01
.... (b) The State submitted an industrial hygiene technical manual patterned after the Federal manual... under the plan to Superfund sites and private contractors working on U.S. Army Corps of Engineers dam...
ERIC Educational Resources Information Center
Bautista, Nazan Uludag; Peters, Kari Nichole
2010-01-01
Can students build a house that is cost effective and strong enough to survive strong winds, heavy rains, and earthquakes? First graders in Ms. Peter's classroom worked like engineers to answer this question. They participated in a design challenge that required them to plan like engineers and build strong and cost-effective houses that would fit…
The Paper Beam: Hands-On Design for Team Work Experience of Freshman in Engineering
ERIC Educational Resources Information Center
Kalkani, Efrossini C.; Boussiakou, Iris K.; Boussiakou, Leda G.
2005-01-01
The present research refers to the assigning of a hands-on group project to freshman engineering students, evaluating their performance, and deriving conclusions on student benefits and educational advances. The research procedure included action plans for the instructor and the students, instructions to the students on performing the work,…
Integration of safety engineering into a cost optimized development program.
NASA Technical Reports Server (NTRS)
Ball, L. W.
1972-01-01
A six-segment management model is presented, each segment of which represents a major area in a new product development program. The first segment of the model covers integration of specialist engineers into 'systems requirement definition' or the system engineering documentation process. The second covers preparation of five basic types of 'development program plans.' The third segment covers integration of system requirements, scheduling, and funding of specialist engineering activities into 'work breakdown structures,' 'cost accounts,' and 'work packages.' The fourth covers 'requirement communication' by line organizations. The fifth covers 'performance measurement' based on work package data. The sixth covers 'baseline requirements achievement tracking.'
Center Planning and Development Student Engineer
NASA Technical Reports Server (NTRS)
Jenkins, Kenneth T.
2013-01-01
This fall I was the Student Trainee (Engineering) Pathways Intern (co-op) at the Kennedy Space Center (KSC) in the Center Planning Development (CPD) Directorate. CPD works with commercial companies who are interested using KSCs unique capabilities in spaceflight, spacecraft processing, ground systems and Research Development (RD) projects that fall in line with NASAs mission and goals. CPD is divided into four (4) groups: (1) AD-A, which works on the Master Planning for center, (2) AD-B (where I am), which works on project management and integration, (3) AD-C, which works on partnership development, and (4) AD-T, which works on the RD aspects of partnerships. CPDs main goal is to one day make KSC the worlds largest spaceport and maintain the center as a leader in space exploration. CPD is a very diverse group with employees having a wide knowledge of not only the Space Shuttle, but also that of the Apollo era. Our director of CPD, Scott Colloredo, is on the advisory board for Commercial Space Operations (CSO) and has a degree at ERAU. I worked on a number of different tasks for AD-B, as well as CPD, that includes, but not limited to: reviewing and reissuing engineering drawings from the Apollo and Shuttle eras, to supporting NASA rocket launches (MAVEN), and working on actual agreementsproposals that will be used in the partnership process with multiple partners. Most of the work I have done is sensitive information and cannot be disclosed.
ERIC Educational Resources Information Center
DuBois, Phyllis; Weisgerber, Robert
This career planning guide is intended for precollege students with disabilities who desire careers in science, mathematics, or engineering. The booklet reflects the experiences and advice of 286 individuals with disabilities who are in these careers or preparing for them. The first section summarizes the advantages of a career in these fields,…
Section 107 Detailed Project Report. Fort Gaines Channel (Government Cut) at Dauphin Island, Alabama
1990-03-01
Engineer District, Mobile AREA &WORK UNIT NUMBERS Plan Dev. Sec., Planning Div., (CESAM-PD-FP)- P. 0. Box 2-288, Mobi,L.3.a6628-OO.....,__ 11I...C’ONTAOLLING OFFICE NAME AND ADDRESS M 2 REPORT DATE US. Army Engineer District, Mobile March 1990 Pian Development Sec., Plan. Div., (CESAM-PD-FP) 13 NUMBER...OF PAGES P- 0. Box 2288, Mobile , AL 36628-0001 162 t4. MONITORING AGENCY NAME & ADORESS(11 different from Controlling Office) 15. SECURITY CLASS. (ol
Engineered Barrier System: Physical and Chemical Environment
DOE Office of Scientific and Technical Information (OSTI.GOV)
P. Dixon
2004-04-26
The conceptual and predictive models documented in this Engineered Barrier System: Physical and Chemical Environment Model report describe the evolution of the physical and chemical conditions within the waste emplacement drifts of the repository. The modeling approaches and model output data will be used in the total system performance assessment (TSPA-LA) to assess the performance of the engineered barrier system and the waste form. These models evaluate the range of potential water compositions within the emplacement drifts, resulting from the interaction of introduced materials and minerals in dust with water seeping into the drifts and with aqueous solutions forming bymore » deliquescence of dust (as influenced by atmospheric conditions), and from thermal-hydrological-chemical (THC) processes in the drift. These models also consider the uncertainty and variability in water chemistry inside the drift and the compositions of introduced materials within the drift. This report develops and documents a set of process- and abstraction-level models that constitute the engineered barrier system: physical and chemical environment model. Where possible, these models use information directly from other process model reports as input, which promotes integration among process models used for total system performance assessment. Specific tasks and activities of modeling the physical and chemical environment are included in the technical work plan ''Technical Work Plan for: In-Drift Geochemistry Modeling'' (BSC 2004 [DIRS 166519]). As described in the technical work plan, the development of this report is coordinated with the development of other engineered barrier system analysis model reports.« less
44. Photograph of a line drawing. 'PLAN LAYOUT OF PART ...
44. Photograph of a line drawing. 'PLAN LAYOUT OF PART III, SECTION 1, EQUIPMENT LAYOUT, BUILDINGS H-1 TO H-10 INCL., GRINDING, MANUFACTURING AREA, PLANT 'B'.' From U.S. Army Corps of Engineers. Industrial Facilities Inventory, Holston Ordnance Works, Kingsport, Tennessee. Plant 8, Parts II, III. (Nashville, TN: Office of the District Engineer, 1944). - Holston Army Ammunition Plant, RDX-and-Composition-B Manufacturing Line 9, Kingsport, Sullivan County, TN
31. Photograph of a line drawing. 'PLAN LAYOUT OF PART ...
31. Photograph of a line drawing. 'PLAN LAYOUT OF PART III, SECTION 1, EQUIPMENT LAYOUT, BUILDINGS D-1 TO U-10 INCL., NITRATION, MANUFACTURING AREA, PLANT 'B'.' From U.S. Army Corps of Engineers. Industrial Facilities Inventory, Holston Ordnance Works, Kingsport, Tennessee. Plant B, Parts II, III. (Nashville, TN: Office of the District Engineer, 1944). - Holston Army Ammunition Plant, RDX-and-Composition-B Manufacturing Line 9, Kingsport, Sullivan County, TN
33 CFR 276.6 - General policy.
Code of Federal Regulations, 2013 CFR
2013-07-01
... General policy. (a) This provision will be applied only at locations where a congressionally authorized... commenced after certification shall be eligible for certification except for local engineering work noted... improvement. (e) Local interests are responsible for developing all necessary engineering plans and...
33 CFR 276.6 - General policy.
Code of Federal Regulations, 2014 CFR
2014-07-01
... General policy. (a) This provision will be applied only at locations where a congressionally authorized... commenced after certification shall be eligible for certification except for local engineering work noted... improvement. (e) Local interests are responsible for developing all necessary engineering plans and...
33 CFR 276.6 - General policy.
Code of Federal Regulations, 2012 CFR
2012-07-01
... General policy. (a) This provision will be applied only at locations where a congressionally authorized... commenced after certification shall be eligible for certification except for local engineering work noted... improvement. (e) Local interests are responsible for developing all necessary engineering plans and...
Visit from JAXA to NASA MSFC: The Engines Element & Ideas for Collaboration
NASA Technical Reports Server (NTRS)
Greene, William D.
2013-01-01
System Design, Development, and Fabrication: Design, develop, and fabricate or procure MB-60 component hardware compliant with the imposed technical requirements and in sufficient quantities to fulfill the overall MB-60 development effort. System Development, Assembly, and Test: Manage the scope of the development, assembly, and test-related activities for MB-60 development. This scope includes engine-level development planning, engine assembly and disassembly, test planning, engine testing, inspection, anomaly resolution, and development of necessary ground support equipment and special test equipment. System Integration: Provide coordinated integration in the realms of engineering, safety, quality, and manufacturing disciplines across the scope of the MB-60 design and associated products development Safety and Mission Assurance, structural design, fracture control, materials and processes, thermal analysis. Systems Engineering and Analysis: Manage and perform Systems Engineering and Analysis to provide rigor and structure to the overall design and development effort for the MB-60. Milestone reviews, requirements management, system analysis, program management support Program Management: Manage, plan, and coordinate the activities across all portions of the MB-60 work scope by providing direction for program administration, business management, and supplier management.
Software Engineering Improvement Plan
NASA Technical Reports Server (NTRS)
2006-01-01
In performance of this task order, bd Systems personnel provided support to the Flight Software Branch and the Software Working Group through multiple tasks related to software engineering improvement and to activities of the independent Technical Authority (iTA) Discipline Technical Warrant Holder (DTWH) for software engineering. To ensure that the products, comments, and recommendations complied with customer requirements and the statement of work, bd Systems personnel maintained close coordination with the customer. These personnel performed work in areas such as update of agency requirements and directives database, software effort estimation, software problem reports, a web-based process asset library, miscellaneous documentation review, software system requirements, issue tracking software survey, systems engineering NPR, and project-related reviews. This report contains a summary of the work performed and the accomplishments in each of these areas.
The Technical Work Plan Tracking Tool
NASA Technical Reports Server (NTRS)
Chullen, Cinda; Leighton, Adele; Weller, Richard A.; Woodfill, Jared; Parkman, William E.; Ellis, Glenn L.; Wilson, Marilyn M.
2003-01-01
The Technical Work Plan Tracking Tool is a web-based application that enables interactive communication and approval of contract requirements that pertain to the administration of the Science, Engineering, Analysis, and Test (SEAT) contract at Johnson Space Center. The implementation of the application has (1) shortened the Technical Work Plan approval process, (2) facilitated writing and documenting requirements in a performance-based environment with associated surveillance plans, (3) simplified the contractor s estimate of the cost for the required work, and (4) allowed for the contractor to document how they plan to accomplish the work. The application is accessible to over 300 designated NASA and contractor employees via two Web sites. For each employee, the application regulates access according to the employee s authority to enter, view, and/or print out diverse information, including reports, work plans, purchase orders, and financial data. Advanced features of this application include on-line approval capability, automatic e-mail notifications requesting review by subsequent approvers, and security inside and outside the firewall.
23 CFR 661.5 - What definitions apply to this regulation?
Code of Federal Regulations, 2014 CFR
2014-04-01
... prescribed scope of work. Preliminary engineering (PE) means planning, survey, design, engineering, and... survey staking functions considered necessary for effective control of the construction operations... carrying capacity (comparison of the original design load to the State legal load), clearance, or approach...
23 CFR 661.5 - What definitions apply to this regulation?
Code of Federal Regulations, 2012 CFR
2012-04-01
... prescribed scope of work. Preliminary engineering (PE) means planning, survey, design, engineering, and... survey staking functions considered necessary for effective control of the construction operations... carrying capacity (comparison of the original design load to the State legal load), clearance, or approach...
23 CFR 661.5 - What definitions apply to this regulation?
Code of Federal Regulations, 2011 CFR
2011-04-01
... prescribed scope of work. Preliminary engineering (PE) means planning, survey, design, engineering, and... survey staking functions considered necessary for effective control of the construction operations... carrying capacity (comparison of the original design load to the State legal load), clearance, or approach...
23 CFR 661.5 - What definitions apply to this regulation?
Code of Federal Regulations, 2010 CFR
2010-04-01
... prescribed scope of work. Preliminary engineering (PE) means planning, survey, design, engineering, and... survey staking functions considered necessary for effective control of the construction operations... carrying capacity (comparison of the original design load to the State legal load), clearance, or approach...
23 CFR 661.5 - What definitions apply to this regulation?
Code of Federal Regulations, 2013 CFR
2013-04-01
... prescribed scope of work. Preliminary engineering (PE) means planning, survey, design, engineering, and... survey staking functions considered necessary for effective control of the construction operations... carrying capacity (comparison of the original design load to the State legal load), clearance, or approach...
CasCADe: A Novel 4D Visualization System for Virtual Construction Planning.
Ivson, Paulo; Nascimento, Daniel; Celes, Waldemar; Barbosa, Simone Dj
2018-01-01
Building Information Modeling (BIM) provides an integrated 3D environment to manage large-scale engineering projects. The Architecture, Engineering and Construction (AEC) industry explores 4D visualizations over these datasets for virtual construction planning. However, existing solutions lack adequate visual mechanisms to inspect the underlying schedule and make inconsistencies readily apparent. The goal of this paper is to apply best practices of information visualization to improve 4D analysis of construction plans. We first present a review of previous work that identifies common use cases and limitations. We then consulted with AEC professionals to specify the main design requirements for such applications. These guided the development of CasCADe, a novel 4D visualization system where task sequencing and spatio-temporal simultaneity are immediately apparent. This unique framework enables the combination of diverse analytical features to create an information-rich analysis environment. We also describe how engineering collaborators used CasCADe to review the real-world construction plans of an Oil & Gas process plant. The system made evident schedule uncertainties, identified work-space conflicts and helped analyze other constructability issues. The results and contributions of this paper suggest new avenues for future research in information visualization for the AEC industry.
Incorporating natural hazard assessments into municipal master-plans; case-studies from Israel
NASA Astrophysics Data System (ADS)
Katz, Oded
2010-05-01
The active Dead Sea Rift (DSR) runs along the length of Israel, making the entire state susceptible to earthquake-related hazards. Current building codes generally acknowledge seismic hazards and direct engineers towards earthquake-resistant structures. However, hazard mapping on a scale fit for municipal/governmental planning is subject to local initiative and is currently not mandatory as seems necessary. In the following, a few cases of seismic-hazard evaluation made by the Geological Survey of Israel are presented, emphasizing the reasons for their initiation and the way results were incorporated (or not). The first case is a seismic hazard qualitative micro-zonation invited by the municipality of Jerusalem as part of a new master plan. This work resulted in maps (1:50,000; GIS format) identifying areas prone to (1) amplification of seismic shaking due to site characteristics (outcrops of soft rocks or steep topography) and (2) sites with earthquake induced landslide (EILS) hazard. Results were validated using reports from the 1927, M=6.2 earthquake that originated along the DSR about 30km east of Jerusalem. Although the hazard maps were accepted by municipal authorities, practical use by geotechnical engineers working within the frame of the new master-plan was not significant. The main reason for that is apparently a difference of opinion between the city-engineers responsible for implementing the new master-plan and the geologists responsible of the hazard evaluation. The second case involves evaluation of EILS hazard for two towns located further north along the DSR, Zefat and Tiberias. Both were heavily damaged more than once by strong earthquakes in past centuries. Work was carried out as part of a governmental seismic-hazard reduction program. The results include maps (1:10,000 scales) of sites with high EILS hazard identified within city limits. Maps (in GIS format) were sent to city engineers with reports explaining the methods and results. As far as we know, widespread implementation of the maps within municipal master plans never came about, and there was no open discussion between city engineers and the Geological Survey. The main reasons apparently are (1) a lack, until recently, of mandatory building codes requiring incorporation of EILS hazard; (2) budget priorities; (3) failure to involve municipality personnel in planning and executing the EILS hazard evaluation. These cases demonstrate that for seismic hazard data to be incorporated and implemented within municipal master-plans there needs to be (1) active involvement of municipal officials and engineers from the early planning stages of the evaluation campaign, and (2) a-priori dedication of funds towards implementation of evaluation results.
Repository-Based Software Engineering Program: Working Program Management Plan
NASA Technical Reports Server (NTRS)
1993-01-01
Repository-Based Software Engineering Program (RBSE) is a National Aeronautics and Space Administration (NASA) sponsored program dedicated to introducing and supporting common, effective approaches to software engineering practices. The process of conceiving, designing, building, and maintaining software systems by using existing software assets that are stored in a specialized operational reuse library or repository, accessible to system designers, is the foundation of the program. In addition to operating a software repository, RBSE promotes (1) software engineering technology transfer, (2) academic and instructional support of reuse programs, (3) the use of common software engineering standards and practices, (4) software reuse technology research, and (5) interoperability between reuse libraries. This Program Management Plan (PMP) is intended to communicate program goals and objectives, describe major work areas, and define a management report and control process. This process will assist the Program Manager, University of Houston at Clear Lake (UHCL) in tracking work progress and describing major program activities to NASA management. The goal of this PMP is to make managing the RBSE program a relatively easy process that improves the work of all team members. The PMP describes work areas addressed and work efforts being accomplished by the program; however, it is not intended as a complete description of the program. Its focus is on providing management tools and management processes for monitoring, evaluating, and administering the program; and it includes schedules for charting milestones and deliveries of program products. The PMP was developed by soliciting and obtaining guidance from appropriate program participants, analyzing program management guidance, and reviewing related program management documents.
75 FR 7256 - Denali Commission Fiscal Year 2010 Draft Work Plan
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-18
...--Radiology Equipment.. 36,733. Bartlett Regional Hospital--Blood 52,500. Chemistry Analyzer. Mt. Edgecumbe... corporations, native nonprofit entities, or tribal governments, including one member who is a civil engineer... engineer. The Transportation Program addresses two areas of rural Alaska transportation infrastructure...
Federal Student Aid (FSA) Five-Year Strategic Plan. FY 2004-2008
ERIC Educational Resources Information Center
US Department of Education, 2004
2004-01-01
The FSA Five-Year Strategic Plan is a roadmap for FY 2004-2008 that identifies five long-range strategic objectives, tactical short-term goals, and performance management initiatives. In working toward the goals outlined in the plan, FSA will address a number of key challenges, including legacy system migration, business process re-engineering,…
Software And Systems Engineering Risk Management
2010-04-01
RSKM 2004 COSO Enterprise RSKM Framework 2006 ISO/IEC 16085 Risk Management Process 2008 ISO/IEC 12207 Software Lifecycle Processes 2009 ISO/IEC...1 Software And Systems Engineering Risk Management John Walz VP Technical and Conferences Activities, IEEE Computer Society Vice-Chair Planning...Software & Systems Engineering Standards Committee, IEEE Computer Society US TAG to ISO TMB Risk Management Working Group Systems and Software
NASA Women's History Month - Erin Waggoner (AFRC)
2018-03-20
Erin Waggoner is an Aerospace Engineer in the Aerodynamics and Propulsion Branch at NASA Armstrong Flight Research Center. Erin has a BS in Aerospace Engineering from Wichita State University and a MS in Aeronautics and Astronautics from Purdue University. Her work includes planning, coordinating, and executing ground tests; analyzing data; writing papers; and serving as a Flight Test Engineer onboard test aircraft.
NASA Technical Reports Server (NTRS)
Jaap, John; Muery, Kim
2000-01-01
Scheduling engines are found at the core of software systems that plan and schedule activities and resources. A Request-Oriented Scheduling Engine (ROSE) is one that processes a single request (adding a task to a timeline) and then waits for another request. For the International Space Station, a robust ROSE-based system would support multiple, simultaneous users, each formulating requests (defining scheduling requirements), submitting these requests via the internet to a single scheduling engine operating on a single timeline, and immediately viewing the resulting timeline. ROSE is significantly different from the engine currently used to schedule Space Station operations. The current engine supports essentially one person at a time, with a pre-defined set of requirements from many payloads, working in either a "batch" scheduling mode or an interactive/manual scheduling mode. A planning and scheduling process that takes advantage of the features of ROSE could produce greater customer satisfaction at reduced cost and reduced flow time. This paper describes a possible ROSE-based scheduling process and identifies the additional software component required to support it. Resulting changes to the management and control of the process are also discussed.
NASA Astrophysics Data System (ADS)
Claver, C. F.; Selvy, Brian M.; Angeli, George; Delgado, Francisco; Dubois-Felsmann, Gregory; Hascall, Patrick; Lotz, Paul; Marshall, Stuart; Schumacher, German; Sebag, Jacques
2014-08-01
The Large Synoptic Survey Telescope project was an early adopter of SysML and Model Based Systems Engineering practices. The LSST project began using MBSE for requirements engineering beginning in 2006 shortly after the initial release of the first SysML standard. Out of this early work the LSST's MBSE effort has grown to include system requirements, operational use cases, physical system definition, interfaces, and system states along with behavior sequences and activities. In this paper we describe our approach and methodology for cross-linking these system elements over the three classical systems engineering domains - requirement, functional and physical - into the LSST System Architecture model. We also show how this model is used as the central element to the overall project systems engineering effort. More recently we have begun to use the cross-linked modeled system architecture to develop and plan the system verification and test process. In presenting this work we also describe "lessons learned" from several missteps the project has had with MBSE. Lastly, we conclude by summarizing the overall status of the LSST's System Architecture model and our plans for the future as the LSST heads toward construction.
DOT National Transportation Integrated Search
2014-04-01
Start time variability in work schedules is often hypothesized to be a cause of railroad employee fatigue because unpredictable work start times prevent employees from planning sleep and personal activities. This report examines work start time diffe...
33 CFR 209.345 - Water resource policies and authorities.
Code of Federal Regulations, 2010 CFR
2010-07-01
.... Reimbursement for Advance Non-Federal Participation in Civil Works Projects (a) Purpose. This regulation gives... regulation applies to all field operating agencies having Civil Works responsibilities. (c) References. (1... develop the design memorandum, engineering plans, and specifications for the work it proposes to undertake...
Analysis of change orders in geotechnical engineering work at INDOT.
DOT National Transportation Integrated Search
2011-01-01
Change orders represent a cost to the State and to tax payers that is real and often extremely large because contractors tend to charge very large : amounts to any additional work that deviates from the work that was originally planned. Therefore, ef...
42. Photograph of a line drawing. 'CROSS SECTION AND PLAN ...
42. Photograph of a line drawing. 'CROSS SECTION AND PLAN LAYOUT OF PART I, SECTION 8, BUILDINGS NO. H-1 TO H-10 INCL., GRINDING, MANUFACTURING AREA, PLANT B AS OF 4-24-44.' From the U.S. Army Corps of Engineers. Industrial Facilities Inventory, Holston Ordnance Works, Kingsport, Tennessee. Plant B, Parts II, III. (NashVille, TN: Office of the District Engineer, 1944). - Holston Army Ammunition Plant, RDX-and-Composition-B Manufacturing Line 9, Kingsport, Sullivan County, TN
29. Photograph of a line drawing. 'CROSS SECTION AND PLAN ...
29. Photograph of a line drawing. 'CROSS SECTION AND PLAN LAYOUT OF PART I, SECTION 8, BUILDINGS NO. D-1 TO D-10 INCL., NITRATION, MANUFACTURING AREA, PLANT B AS OF 4-24-44.' From the U.S. Army Corps of Engineers. Industrial Facilities Inventory, Holston Ordnance Works, Kingsport, Tennessee. Plant B, Parts II, III. (Nashville, TN: Office of the District Engineer, 1944). - Holston Army Ammunition Plant, RDX-and-Composition-B Manufacturing Line 9, Kingsport, Sullivan County, TN
26. Photograph of a line drawing. 'PLAN LAYOUT AND CROSS ...
26. Photograph of a line drawing. 'PLAN LAYOUT AND CROSS SECTION OF PART I, SECTION 8, BUILDINGS NO. C-1, C-3, C-5, C-6, C-7, C-9, MIXING, MANUFACTURING AREA, PLANT B AS OF 4-24-44.' From the U.S. Army Corps of Engineers. Industrial Facilities Inventory, Holston Ordnance Works, Kingsport, Tennessee. Plant B, Parts II, III. (Nashville, TN: Office of the District Engineer, 1944). - Holston Army Ammunition Plant, RDX-and-Composition-B Manufacturing Line 9, Kingsport, Sullivan County, TN
27. Photograph of a line drawing. 'PLAN LAYOUT AND CROSS ...
27. Photograph of a line drawing. 'PLAN LAYOUT AND CROSS SECTION OF PART III, SECTION 1, EQUIPMENT LAYOUT, BUILDINGS C-1, C-3, C-5, C-6, C-7, C-9 INCL., MIXING, MANUFACTURING AREA, PLANT 'B'.' From the U.S. Army Corps of Engineers. Industrial Facilities Inventory, Holston Ordnance Works, Kingsport, Tennessee. Plant B, Parts II, III. (Nashville, TN: Office of the District Engineer, 1944). - Holston Army Ammunition Plant, RDX-and-Composition-B Manufacturing Line 9, Kingsport, Sullivan County, TN
Work Measurements: Interdisciplinary Overlap in Manufacturing and Algebra I
ERIC Educational Resources Information Center
Rose, Mary Annette
2007-01-01
Manufacturing engineering provides a relevant context from which to envision interdisciplinary learning experiences because engineers integrate their knowledge and skills of manufacturing and algebra processes in order to plan the efficient manufacture of products. In this article, the author describes an interdisciplinary learning activity that…
Tanker Fuel Efficiency: Saving Through Receiver Fuel Planning
2014-06-13
engage your weapon.” General James Mattis , 2003 Conclusions The current planning and execution of air refueling missions are costing the DOD...fuel cells, and bio fuels are being explored by scientists and engineers working to reduce the United States’ dependency on foreign oil (Harmon
DOE Office of Scientific and Technical Information (OSTI.GOV)
Heubach, J.G.; Weimer, W.C.; Bruce, W.A.
Facility master planning is critical to the future productivity of a laboratory and the quality of worklife for the laboratory staff. For organizations undergoing programmatic re-direction, a master facility planning approach linked to the organization`s strategic planning process is even more important. Major changes in an organization such as programmatic re-direction can significantly impact a broad range of variables which exceed the expertise of traditional planning teams, e.g., capacity variability, work team organization, organizational culture, and work process simplification. By expanding the diversity of the participants of the planning team, there is a greater likelihood that a research organization`s scientific,more » organizational, economic, and employees` needs can be meshed in the strategic plan and facility plan. Recent recommendations from facility planners suggest drawing from diverse fields in building multi-disciplinary planning teams: Architecture, engineering, natural science, social psychology, and strategic planning (Gibson,1993). For organizations undergoing significant operational or culture change, the master facility planning team should also include members with expertise in organizational effectiveness, industrial engineering, human resources, and environmental psychology. A recent planning and design project provides an example which illustrates the use of an expanded multi-disciplinary team engaged in planning laboratory renovations for a research organization undergoing programmatic re-direction. The purpose of the proposed poster session is to present a multi-disciplinary master facility planning process linked to an organization`s strategic planning process or organizational strategies.« less
Human-Automation Integration: Principle and Method for Design and Evaluation
NASA Technical Reports Server (NTRS)
Billman, Dorrit; Feary, Michael
2012-01-01
Future space missions will increasingly depend on integration of complex engineered systems with their human operators. It is important to ensure that the systems that are designed and developed do a good job of supporting the needs of the work domain. Our research investigates methods for needs analysis. We included analysis of work products (plans for regulation of the space station) as well as work processes (tasks using current software), in a case study of Attitude Determination and Control Officers (ADCO) planning work. This allows comparing how well different designs match the structure of the work to be supported. Redesigned planning software that better matches the structure of work was developed and experimentally assessed. The new prototype enabled substantially faster and more accurate performance in plan revision tasks. This success suggests the approach to needs assessment and use in design and evaluation is promising, and merits investigatation in future research.
33. Photocopy of engineering drawing. NEW WHITE ROOM AND MULTISOLIDS ...
33. Photocopy of engineering drawing. NEW WHITE ROOM AND MULTISOLIDS MODIFICATIONS FOR STRETCHED TANK DELTA, LAUNCH COMPLEX 17-A: PAD AREA PLAN-REMOVAL WORK, CIVIL, APRIL 1972. - Cape Canaveral Air Station, Launch Complex 17, Facility 28501, East end of Lighthouse Road, Cape Canaveral, Brevard County, FL
Teaching, Learning and Evaluation Techniques in the Engineering Courses.
ERIC Educational Resources Information Center
Vermaas, Luiz Lenarth G.; Crepaldi, Paulo Cesar; Fowler, Fabio Roberto
This article presents some techniques of professional formation from the Petra Model that can be applied in Engineering Programs. It shows its philosophy, teaching methods for listening, making abstracts, studying, researching, team working and problem solving. Some questions regarding planning and evaluation, based in the model are, as well,…
A planning and scheduling lexicon
NASA Technical Reports Server (NTRS)
Cruz, Jennifer W.; Eggemeyer, William C.
1989-01-01
A lexicon related to mission planning and scheduling for spacecraft is presented. Planning and scheduling work is known as sequencing. Sequencing is a multistage process of merging requests from both the science and engineering arenas to accomplish the objectives defined in the requests. The multistage process begins with the creation of science and engineering goals, continues through their integration into the sequence, and eventually concludes with command execution onboard the spacecraft. The objective of this publication is to introduce some formalism into the field of spacecraft sequencing-system technology. This formalism will make it possible for researchers and potential customers to communicate about system requirements and capabilities in a common language.
DE-EE0006714 Final Report-Project Icebreaker™
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wagner, Lorry; Karpinski, David; Nagusky, Beth
Project Icebreaker, a 20 Megawatt offshore wind project 8 miles north of Cleveland, OH in Lake Erie, has been under development by the Lake Erie Energy Development Corporation since 2009. Significant development efforts were completed prior to the award of DE-EE0006714 (December 2014). This report describes the status of the work performed under award DE-EE0006714. The work was organized into several categories or tasks. The report presents the status of that work in each of eleven (11) main tasks: 1) State and Federal Permits; 2) Mono Bucket Foundation Engineering; 3) Construction and Installation Engineering; 4) Cable Route Survey; 5) Electricalmore » System Design; 6) Power Off-take; 7) Project Costs and Risk Management; 8) Operations and Maintenance Planning; 9) Domestic Supply Chain Development; 10) Instrumentation Planning; and 11) Department of Energy Review.« less
Robotics Laboratory to Enhance the STEM Research Experience
2015-04-30
the Chemistry Program has a student working on the design and development of a Stirling Engine , which the student is planning to construct using...scale): Number of graduating undergraduates funded by a DoD funded Center of Excellence grant for Education, Research and Engineering : The number of... engineering or technology fields: Student Metrics This section only applies to graduating undergraduates supported by this agreement in this reporting
DOE Office of Scientific and Technical Information (OSTI.GOV)
Weisbin, C.R.; Hamel, W.R.; Barhen, J.
1986-02-01
The Oak Ridge National Laboratory has established the Center for Engineering Systems Advanced Research (CESAR) for the purpose of addressing fundamental problems of intelligent machine technologies. The purpose of this document is to establish a framework and guidelines for research and development within ORNL's CESAR program in areas pertaining to intelligent machines. The specific objective is to present a CESAR Research and Development Plan for such work with a planning horizon of five to ten years, i.e., FY 1985 to FY 1990 and beyond. As much as possible, the plan is based on anticipated DOE needs in the area ofmore » productivity increase and safety to the end of this century.« less
Support to LANL: Cost estimation. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This report summarizes the activities and progress by ICF Kaiser Engineers conducted on behalf of Los Alamos National Laboratories (LANL) for the US Department of Energy, Office of Waste Management (EM-33) in the area of improving methods for Cost Estimation. This work was conducted between October 1, 1992 and September 30, 1993. ICF Kaiser Engineers supported LANL in providing the Office of Waste Management with planning and document preparation services for a Cost and Schedule Estimating Guide (Guide). The intent of the Guide was to use Activity-Based Cost (ABC) estimation as a basic method in preparing cost estimates for DOEmore » planning and budgeting documents, including Activity Data Sheets (ADSs), which form the basis for the Five Year Plan document. Prior to the initiation of the present contract with LANL, ICF Kaiser Engineers was tasked to initiate planning efforts directed toward a Guide. This work, accomplished from June to September, 1992, included visits to eight DOE field offices and consultation with DOE Headquarters staff to determine the need for a Guide, the desired contents of a Guide, and the types of ABC estimation methods and documentation requirements that would be compatible with current or potential practices and expertise in existence at DOE field offices and their contractors.« less
Code of Federal Regulations, 2010 CFR
2010-04-01
...) Engineering, development, artwork, design work, and plans and sketches that are undertaken elsewhere than in... work to which paragraph (a)(1)(iv) of this section applies will be treated as an assist if the service or work: (i) Is performed by an individual domiciled within the United States; (ii) Is performed by...
Understanding safety and production risks in rail engineering planning and protection.
Wilson, John R; Ryan, Brendan; Schock, Alex; Ferreira, Pedro; Smith, Stuart; Pitsopoulos, Julia
2009-07-01
Much of the published human factors work on risk is to do with safety and within this is concerned with prediction and analysis of human error and with human reliability assessment. Less has been published on human factors contributions to understanding and managing project, business, engineering and other forms of risk and still less jointly assessing risk to do with broad issues of 'safety' and broad issues of 'production' or 'performance'. This paper contains a general commentary on human factors and assessment of risk of various kinds, in the context of the aims of ergonomics and concerns about being too risk averse. The paper then describes a specific project, in rail engineering, where the notion of a human factors case has been employed to analyse engineering functions and related human factors issues. A human factors issues register for potential system disturbances has been developed, prior to a human factors risk assessment, which jointly covers safety and production (engineering delivery) concerns. The paper concludes with a commentary on the potential relevance of a resilience engineering perspective to understanding rail engineering systems risk. Design, planning and management of complex systems will increasingly have to address the issue of making trade-offs between safety and production, and ergonomics should be central to this. The paper addresses the relevant issues and does so in an under-published domain - rail systems engineering work.
Simplified web-based decision support method for traffic management and work zone analysis.
DOT National Transportation Integrated Search
2017-01-01
Traffic congestion mitigation is one of the key challenges that transportation planners and operations engineers face when planning for construction and maintenance activities. There is a wide variety of approaches and methods that address work zone ...
Simplified web-based decision support method for traffic management and work zone analysis.
DOT National Transportation Integrated Search
2015-06-01
Traffic congestion mitigation is one of the key challenges that transportation planners and operations engineers face when : planning for construction and maintenance activities. There is a wide variety of approaches and methods that address work : z...
Planning for Graduate Studies in Physics and Related Fields
ERIC Educational Resources Information Center
Henry, Dennis C., Ed.
2002-01-01
This brochure is written for students considering graduate work in physics or related fields such as astronomy, biophysics, and applied physics. It also provides some information for physics undergraduates who plan on pursuing postbaccalaureate studies in the fields of engineering, medicine, law, and other professions that attract significant…
FY 95 engineering work plan for the design reconstitution implementation action plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bigbee, J.D.
Design reconstitution work is to be performed as part of an overall effort to upgrade Configuration Management (CM) at TWRS. WHC policy is to implement a program that is compliant with DOE-STD-1073-93, Guide for Operational Configuration Management Program. DOE-STD-1073 requires an adjunct program for reconstituting design information. WHC-SD-WM-CM-009, Design Reconstitution Program Plan for Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System, is the TWRS plan for meeting DOE-STD-1073 design reconstitution requirements. The design reconstitution plan is complex requiring significant time and effort for implementation. In order to control costs, and integrate the work into other TWRS activities,more » a Design Reconstitution Implementation Action Plan (DR IAP) will be developed, and approved by those organizations having ownership or functional interest in this activity.« less
2016-01-01
carpentry, masonry , and the operation of heavy equipment. Plans called for the NEB to receive at least $29 million in engineering equipment and...JTF Sapper, NMCB 25, and NMCB 28, had responsibility for training the NEB in such areas as plumbing, electrical work, carpentry, masonry , and
Initial test results from a prototype, 20 kW helium charged Stirling engine
DOE Office of Scientific and Technical Information (OSTI.GOV)
Clarke, M.A.; Taylor, D.R.
An alpha-configuration, helium charged Stirling engine with a predicted output of 20 kW indicated power has been developed by a British consortium of universities and industrial companies. The work performed by the Royal Naval Engineering College has been in computer assisted design and component testing, with future plans for full engine trials during 1984/85. The scope of this paper is to outline the data obtained during motoring trials of the engine block and crankcase assembly, together with details of modifications incorporated in the various components.
Extending the TSP to Systems Engineering: Early Results from Team Process Integration
2010-08-01
within ±10 percent of what was planned, and there were no high-priority problem reports coming out of test. Employee Work / Life Balance TPI helped improve...employee work / life balance . In order to get their job done before implementing TPI, employees rou- tinely worked overtime. With TPI (and in COMING
Usability engineering: domain analysis activities for augmented-reality systems
NASA Astrophysics Data System (ADS)
Gabbard, Joseph; Swan, J. E., II; Hix, Deborah; Lanzagorta, Marco O.; Livingston, Mark; Brown, Dennis B.; Julier, Simon J.
2002-05-01
This paper discusses our usability engineering process for the Battlefield Augmented Reality System (BARS). Usability engineering is a structured, iterative, stepwise development process. Like the related disciplines of software and systems engineering, usability engineering is a combination of management principals and techniques, formal and semi- formal evaluation techniques, and computerized tools. BARS is an outdoor augmented reality system that displays heads- up battlefield intelligence information to a dismounted warrior. The paper discusses our general usability engineering process. We originally developed the process in the context of virtual reality applications, but in this work we are adapting the procedures to an augmented reality system. The focus of this paper is our work on domain analysis, the first activity of the usability engineering process. We describe our plans for and our progress to date on our domain analysis for BARS. We give results in terms of a specific urban battlefield use case we have designed.
7 CFR 1924.5 - Planning development work.
Code of Federal Regulations, 2014 CFR
2014-01-01
... cash to be furnished by the borrower, proceeds from cost sharing programs such as Agricultural...) Drawings, specifications, and estimates will fully describe the work. Technical data, tests, or engineering... building code. (i) Agricultural buildings that are not intended for human habitation are exempt from these...
7 CFR 1924.5 - Planning development work.
Code of Federal Regulations, 2013 CFR
2013-01-01
... cash to be furnished by the borrower, proceeds from cost sharing programs such as Agricultural...) Drawings, specifications, and estimates will fully describe the work. Technical data, tests, or engineering... building code. (i) Agricultural buildings that are not intended for human habitation are exempt from these...
7 CFR 1924.5 - Planning development work.
Code of Federal Regulations, 2012 CFR
2012-01-01
... cash to be furnished by the borrower, proceeds from cost sharing programs such as Agricultural...) Drawings, specifications, and estimates will fully describe the work. Technical data, tests, or engineering... building code. (i) Agricultural buildings that are not intended for human habitation are exempt from these...
41 CFR 102-71.20 - What definitions apply to GSA's real property policies?
Code of Federal Regulations, 2013 CFR
2013-07-01
... planning, engineering, architectural work, and other similar actions. Carpool means a group of two or more... tested in accordance with the American Society for Testing and Materials, Test E 84, Surface Burning... space in a facility under GSA's custody and control. Occupant Emergency Plan means procedures developed...
41 CFR 102-71.20 - What definitions apply to GSA's real property policies?
Code of Federal Regulations, 2012 CFR
2012-01-01
... planning, engineering, architectural work, and other similar actions. Carpool means a group of two or more... tested in accordance with the American Society for Testing and Materials, Test E 84, Surface Burning... space in a facility under GSA's custody and control. Occupant Emergency Plan means procedures developed...
Metis Hub: The Development of an Intuitive Project Planning System
DOE Office of Scientific and Technical Information (OSTI.GOV)
McConnell, Rachael M.; Lawrence Livermore National Lab.
2015-08-26
The goal is to develop an intuitive, dynamic, and consistent interface for the Metis Planning System by combining user requirements and human engineering concepts. The system is largely based upon existing systems so some tools already have working models that we can follow. However, the web-based interface is completely new.
Spatial Coverage Planning and Optimization for Planetary Exploration
NASA Technical Reports Server (NTRS)
Gaines, Daniel M.; Estlin, Tara; Chouinard, Caroline
2008-01-01
We are developing onboard planning and scheduling technology to enable in situ robotic explorers, such as rovers and aerobots, to more effectively assist scientists in planetary exploration. In our current work, we are focusing on situations in which the robot is exploring large geographical features such as craters, channels or regional boundaries. In to develop valid and high quality plans, the robot must take into account a range of scientific and engineering constraints and preferences. We have developed a system that incorporates multiobjective optimization and planning allowing the robot to generate high quality mission operations plans that respect resource limitations and mission constraints while attempting to maximize science and engineering objectives. An important scientific objective for the exploration of geological features is selecting observations that spatially cover an area of interest. We have developed a metric to enable an in situ explorer to reason about and track the spatial coverage quality of a plan. We describe this technique and show how it is combined in the overall multiobjective optimization and planning algorithm.
Dr. John H. Hopps Jr. Defense Research Scholars Program
2014-12-16
Summer 2011) Post -Graduation Plans • Employed as a mechanical engineer at Allegion. • Applying to graduate programs in industrial design and mechanical...Summer 2010) • Multi-Layer Mirror Design for Ultra-Soft X-Rays, Ecole Polytechnique (Summer 2011) Post -Graduation Plans • Post Baccalaureate Research...the year off to work while others planned on strengthening their applications by broadening their research skills in post baccalaureate programs
Pretest Predictions for Phase II Ventilation Tests
DOE Office of Scientific and Technical Information (OSTI.GOV)
Yiming Sun
The objective of this calculation is to predict the temperatures of the ventilating air, waste package surface, and concrete pipe walls that will be developed during the Phase II ventilation tests involving various test conditions. The results will be used as inputs to validating numerical approach for modeling continuous ventilation, and be used to support the repository subsurface design. The scope of the calculation is to identify the physical mechanisms and parameters related to thermal response in the Phase II ventilation tests, and describe numerical methods that are used to calculate the effects of continuous ventilation. The calculation is limitedmore » to thermal effect only. This engineering work activity is conducted in accordance with the ''Technical Work Plan for: Subsurface Performance Testing for License Application (LA) for Fiscal Year 2001'' (CRWMS M&O 2000d). This technical work plan (TWP) includes an AP-2.21Q, ''Quality Determinations and Planning for Scientific, Engineering, and Regulatory Compliance Activities'', activity evaluation (CRWMS M&O 2000d, Addendum A) that has determined this activity is subject to the YMP quality assurance (QA) program. The calculation is developed in accordance with the AP-3.12Q procedure, ''Calculations''. Additional background information regarding this activity is contained in the ''Development Plan for Ventilation Pretest Predictive Calculation'' (DP) (CRWMS M&O 2000a).« less
Supporting Habitat Management for bird conservation planning on Fort Belvoir, Virginia
Richard A. Fischer; Chris Eberly; Dorothy Keough
2005-01-01
The U.S. Army Corps of Engineers, Engineer Research and Development Center (ERDC), Environmental Laboratory has conducted seasonal avian surveys (winter, spring, summer, fall) from Spring 1998 through Summer 2002 at approximately 127 permanent point-count locations on Fort Belvoir, VA. This work has resulted in a data-rich baseline understanding of the distribution and...
NASA Astrophysics Data System (ADS)
Moldwin, M.; Mexicotte, D.
2017-12-01
A new Arts/Lab Student Residence program was developed at the University of Michigan that brings artists into a research lab. Science and Engineering undergraduate and graduate students working in the lab describe their research and allow the artists to shadow them to learn more about the work. The Arts/Lab Student Residencies are designed to be unique and fun, while encouraging interdisciplinary learning and creative production by exposing students to life and work in an alternate discipline's maker space - i.e. the artist in the engineering lab, the engineer in the artist's studio or performance space. Each residency comes with a cash prize and the expectation that a work of some kind will be produced as a response to experience. The Moldwin Prize is designed for an undergraduate student currently enrolled in the Penny W. Stamps School of Art & Design, the Taubman School of Architecture and Urban Planning or the School of Music, Theatre and Dance who is interested in exchange and collaboration with students engaged in research practice in an engineering lab. No previous science or engineering experience is required, although curiosity and a willingness to explore are essential! Students receiving the residency spend 20 hours over 8 weeks (February-April) participating with the undergraduate research team in the lab of Professor Mark Moldwin, which is currently doing work in the areas of space weather (how the Sun influences the space environment of Earth and society) and magnetic sensor development. The resident student artist will gain a greater understanding of research methodologies in the space and climate fields, data visualization and communication techniques, and how the collision of disciplinary knowledge in the arts, engineering and sciences deepens the creative practice and production of each discipline. The student is expected to produce a final work of some kind within their discipline that reflects, builds on, explores, integrates or traces their experience in the residency. This talk will describe the program, the inaugural year's outcomes, and plans to expand the program to other research labs.
43 CFR 3931.60 - Maps of underground and surface mine workings and in situ surface operations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... workings and in situ surface operations. 3931.60 Section 3931.60 Public Lands: Interior Regulations... § 3931.60 Maps of underground and surface mine workings and in situ surface operations. Maps of... in plan views. Maps must be based on accurate surveys and certified by a professional engineer...
43 CFR 3931.60 - Maps of underground and surface mine workings and in situ surface operations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... workings and in situ surface operations. 3931.60 Section 3931.60 Public Lands: Interior Regulations... § 3931.60 Maps of underground and surface mine workings and in situ surface operations. Maps of... in plan views. Maps must be based on accurate surveys and certified by a professional engineer...
43 CFR 3931.60 - Maps of underground and surface mine workings and in situ surface operations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... workings and in situ surface operations. 3931.60 Section 3931.60 Public Lands: Interior Regulations... § 3931.60 Maps of underground and surface mine workings and in situ surface operations. Maps of... in plan views. Maps must be based on accurate surveys and certified by a professional engineer...
Building on the past, planning for the future
DOE Office of Scientific and Technical Information (OSTI.GOV)
Woodall, D.M.
1996-12-31
A University Working Conference (UWC) sponsored by the American Nuclear Society (ANS) was held on June 14 and 15, 1996, prior to the ANS Annual Meeting in Reno, Nevada. With a theme of {open_quotes}Building on the Past, Planning for the Future,{close_quotes} the meeting was the successor to the first UWC held in Philadelphia, Pennsylvania, in 1995. This workshop refined the recommendations to the national nuclear engineering academic community of the earlier UWC on strategies for success in the 21st century. This UWC had 40 attendees from academe and industry, and the program was developed around the outcomes of the Philadelphiamore » meeting. The general chair of UWC96 was Don Miller of Ohio State University, while the author of this paper served as the technical program chair. Assistant technical program chairs included Madeline Feltus of Pennsylvania State University, Dan Bullen of Iowa State University, and Gilbert Brown of the University of Massachusetts Lowell. A working conference is often loosely structured, with an informal, flexible program, consisting of a few highlight or keynote presentations followed by workshop sessions devoted to a theme area. The workshop sessions at this meeting included the following: 1. strategic planning in today`s climate; 2. university/industry research collaboration; 3. profiles of nuclear engineering and radiological engineering students, now and in the future; 4. accreditation issues, especially ABET`s engineering 2000; 5. employment of nuclear and radiological engineers; 6. new program thrusts in nuclear engineering departments; 7. uses of new technology in the classroom and laboratory; 8. internet access to information for education; 9. distance education/remote delivery of curricula.« less
Summary of Results from Space Shuttle Main Engine Off-Nominal Testing
NASA Technical Reports Server (NTRS)
Horton, James F.; Megivern, Jeffrey M.; McNutt, Leslie M.
2011-01-01
This paper is a summary of Space Shuttle Main Engine (SSME) off-nominal testing that occurred during 2008 and 2009. During the last two years of planned SSME testing at Stennis Space Center, Pratt & Whitney Rocketdyne worked with their NASA MSFC customer to systematically identify, develop, assess, and implement challenging test objectives in order to expand the knowledge of one of the world s most reliable and highly tested large rocket engine. The objectives successfully investigated three main areas of interest expanding engine performance margins, demonstrating system operational capabilities, and establishing ground work for new rocket engine technology. The testing gave the Space Shuttle Program new options to safely fly out the flight manifest and provided Pratt & Whitney Rocketdyne and NASA new insight into the operational capabilities of the SSME, capabilities which can be used in assessing potential future applications of the RS-25 engine.
FY 1987 current fiscal year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, informationmore » gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.« less
Orbit Transfer Rocket Engine Technology - 7.5K-LB Thrust Rocket Engine Preliminary Design
1993-10-15
AND SPACE ADMINISTRATION October, 1993 r W NASA-Lewis Research Center Cleveland, Ohio 44135 94-08572 Contract Nc. NAS3-23773 Task B.7 and D.5 4I3’OA4 3 ...APPROACH 1 4.0 SUMMARY OF ACCOMPLISHMENTS 2 5.0 TECHNICAL DISCUSSIONS 3 6.0 PROGRAM WORK PLAN 5 6.1 Engine Analysis 5 6.2 Component Analysis 15 6.2.1...FIGURES Page Figure 1 Advanced Engine Studv Logic Diagram 4 Figure 2 Design Point Engine Pertormance at Full Thrust & MR = 6.0 7 Figure 3 Off-Design
Analysis of Engineering Faculty Members' Reflections on Planning for Instruction
ERIC Educational Resources Information Center
Warcholak, Nicholas D.
2014-01-01
The purpose of this study was to begin development of a method to better describe the instructional planning processes of post-secondary teachers. Long term, it is hoped this work might have constructive implications for faculty development by providing a few case studies demonstrating how instructors with a strong interest in teaching think about…
ALS rocket engine combustion devices design and demonstration
NASA Technical Reports Server (NTRS)
Arreguin, Steve
1989-01-01
Work performed during Phase one is summarized and the significant technical and programmatic accomplishments occurring during this period are documented. Besides a summary of the results, methodologies, trade studies, design, fabrication, and hardware conditions; the following are included: the evolving Maintainability Plan, Reliability Program Plan, Failure Summary and Analysis Report, and the Failure Mode and Effect Analysis.
41. 'Firing Pier, Second Floor Plan, Section No. 2,' submitted ...
41. 'Firing Pier, Second Floor Plan, Section No. 2,' submitted 29 December 1941 by John Brackett, Consulting Engineer, to Public Works Department, Bureau of Yards & Docks. PW Drawing 3867-46, Y&D Drawing 190841. Scale 1/4' = 1'. - Naval Torpedo Station, Firing Pier, North end of Gould Island in Narragansett Bay, Newport, Newport County, RI
42. 'Firing Pier, Second Floor Plan, Section No. 3,' submitted ...
42. 'Firing Pier, Second Floor Plan, Section No. 3,' submitted 29 December 1941 by John Brackett, Consulting Engineer, to Public Works Department, Bureau of Yards & Docks. PW Drawing 3868-46, Y&D Drawing 190842. Scale 1/4' = 1'. - Naval Torpedo Station, Firing Pier, North end of Gould Island in Narragansett Bay, Newport, Newport County, RI
36. 'Firing Pier, First Floor Plan, Section No. 1,' submitted ...
36. 'Firing Pier, First Floor Plan, Section No. 1,' submitted 29 December 1941 by John Brackett, Consulting Engineer, to Public Works Department, Bureau of Yards & Docks. PW Drawing 3862-46, Y&D Drawing 190836. Scale 1/4' = 1'. - Naval Torpedo Station, Firing Pier, North end of Gould Island in Narragansett Bay, Newport, Newport County, RI
43. 'Firing Pier, Third and Fourth Floors and Roof Plan,' ...
43. 'Firing Pier, Third and Fourth Floors and Roof Plan,' submitted 29 December 1941 by John Brackett, Consulting Engineer, to Public Works Department, Bureau of Yards & Docks. PW Drawing 3869-46, Y&D Drawing 190843. Scale 1/4' = 1'. - Naval Torpedo Station, Firing Pier, North end of Gould Island in Narragansett Bay, Newport, Newport County, RI
38. 'Firing Pier, First Floor Plan, Section No. 3,' submitted ...
38. 'Firing Pier, First Floor Plan, Section No. 3,' submitted 29 December 1941 by John Brackett, Consulting Engineer, to Public Works Department, Bureau of Yards & Docks. PW Drawing 3864-46, Y&D Drawing 190838. Scale 1/4' = 1'. - Naval Torpedo Station, Firing Pier, North end of Gould Island in Narragansett Bay, Newport, Newport County, RI
40. 'Firing Pier, Second Floor Plan, Section No. 1,' submitted ...
40. 'Firing Pier, Second Floor Plan, Section No. 1,' submitted 29 December 1941 by John Brackett, Consulting Engineer, to Public Works Department, Bureau of Yards & Docks. PW Drawing 3866-46, Y&D Drawing 190840. Scale 1/4' = 1'. - Naval Torpedo Station, Firing Pier, North end of Gould Island in Narragansett Bay, Newport, Newport County, RI
30. 'Gould Island Facilities, General Plan,' submitted 29 December 1941 ...
30. 'Gould Island Facilities, General Plan,' submitted 29 December 1941 by John Brackett, Consulting Engineer, to Public Works Department, Bureau of Yards & Docks. PW Drawing 3859-46, Y&D Drawing 190833. Scales 1' = 50' and 1' = 10'. - Naval Torpedo Station, Firing Pier, North end of Gould Island in Narragansett Bay, Newport, Newport County, RI
39. 'Firing Pier, First Floor Plan, Section No. 4,' submitted ...
39. 'Firing Pier, First Floor Plan, Section No. 4,' submitted 29 December 1941 by John Brackett, Consulting Engineer, to Public Works Department, Bureau of Yards & Docks. PW Drawing 3865-46, Y&D Drawing 190839. Scale 1/4' = 1'. - Naval Torpedo Station, Firing Pier, North end of Gould Island in Narragansett Bay, Newport, Newport County, RI
37. 'Firing Pier, First Floor Plan, Section No. 2,' submitted ...
37. 'Firing Pier, First Floor Plan, Section No. 2,' submitted 29 December 1941 by John Brackett, Consulting Engineer, to Public Works Department, Bureau of Yards & Docks. PW Drawing 3863-46, Y&D Drawing 190837. Scale 1/4' = 1. - Naval Torpedo Station, Firing Pier, North end of Gould Island in Narragansett Bay, Newport, Newport County, RI
40 CFR 63.7700 - What work practice standards must I meet?
Code of Federal Regulations, 2014 CFR
2014-07-01
... (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Iron and Steel Foundries Work..., slitter, or other materials that do not include post-consumer automotive body scrap, post-consumer engine... written plan for the selection and inspection of iron and steel scrap to minimize, to the extent...
40 CFR 63.7700 - What work practice standards must I meet?
Code of Federal Regulations, 2013 CFR
2013-07-01
... (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Iron and Steel Foundries Work..., slitter, or other materials that do not include post-consumer automotive body scrap, post-consumer engine... written plan for the selection and inspection of iron and steel scrap to minimize, to the extent...
40 CFR 63.7700 - What work practice standards must I meet?
Code of Federal Regulations, 2012 CFR
2012-07-01
... (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Iron and Steel Foundries Work..., slitter, or other materials that do not include post-consumer automotive body scrap, post-consumer engine... written plan for the selection and inspection of iron and steel scrap to minimize, to the extent...
40 CFR 35.917-1 - Content of facilities plan.
Code of Federal Regulations, 2014 CFR
2014-07-01
... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-1... construction drawings and specifications are to be prepared. This description shall include preliminary engineering data, cost estimates for design and construction of the treatment works, and a schedule for...
Work Plan and Field Sampling Plan Site Investigations Fort Devens, Massachusetts
1992-02-01
Plan PPE Personal Protective Equipment PPM Parts Per Million PRI Potomac Research , Inc. PSI Pounds Per Square Inch PVC Polyvinyl Chloride QAPjP Quality...Aquifers with Completely or Partially Penetrating Wells, Water Resources Research , 12: 423-428. Brackley, Richard A. and B. P. Hansen, 1977, Water...of a Finite Diameter Well to an Instantaneous Charge of Water, Water Resources Research , 3: 263-269. Directorate of Engineering and Housing (DEH
Artificial Intelligence Research Branch future plans
NASA Technical Reports Server (NTRS)
Stewart, Helen (Editor)
1992-01-01
This report contains information on the activities of the Artificial Intelligence Research Branch (FIA) at NASA Ames Research Center (ARC) in 1992, as well as planned work in 1993. These activities span a range from basic scientific research through engineering development to fielded NASA applications, particularly those applications that are enabled by basic research carried out in FIA. Work is conducted in-house and through collaborative partners in academia and industry. All of our work has research themes with a dual commitment to technical excellence and applicability to NASA short, medium, and long-term problems. FIA acts as the Agency's lead organization for research aspects of artificial intelligence, working closely with a second research laboratory at the Jet Propulsion Laboratory (JPL) and AI applications groups throughout all NASA centers. This report is organized along three major research themes: (1) Planning and Scheduling: deciding on a sequence of actions to achieve a set of complex goals and determining when to execute those actions and how to allocate resources to carry them out; (2) Machine Learning: techniques for forming theories about natural and man-made phenomena; and for improving the problem-solving performance of computational systems over time; and (3) Research on the acquisition, representation, and utilization of knowledge in support of diagnosis design of engineered systems and analysis of actual systems.
The Georgia Perimeter College MESA Program: Propelling STEM Students to Success
ERIC Educational Resources Information Center
Law, Kouok K.
2011-01-01
From 2006 to 2008, while taking courses at Georgia Perimeter College (GPC), Joel Toussaint worked two jobs, one was at night. Now, he has graduated from Georgia Institute of Technology majoring in mechanical engineering, and he has been admitted to graduate school in mechanical engineer there. His plan for the future is to get his Ph. D. in…
NASA Astrophysics Data System (ADS)
Osipenkova, Irina; Simankina, Tatyana; Syrygina, Taisiia; Lukinov, Vitaliy
2018-03-01
This article represents features of the elaboration of technology organizational models of high-rise building construction in technology organizational documentation on the example of the plan of construction organization. Some examples of enhancing the effectiveness of high-rise building construction based on developments of several options of the organizational and technological plan are examined. Qualitative technology organizational documentation allows to increase the competitiveness of construction companies and provides prime cost of construction and assembly works reductions. Emphasis is placed on the necessity to comply with the principle of comprehensiveness of engineering, scientific and research works, development activities and scientific and technical support.
Jack D. Fellows: Congressional Science Fellow
NASA Astrophysics Data System (ADS)
Jack D. Fellows has been selected as the 1983-84 AGU Congressional Science Fellow. Last week he began his 1-year stint on Capitol Hill as AGU's seventh Congressional Science Fellow.Fellows received his Ph.D. earlier this year from the civil engineering department at the University of Maryland, College Park. For his dissertation he developed a management system using regional geographic information for hydrologic models. His work applied remote sensing data to the decision-making processes of regional planning organizations concerned with hydrology and natural resource management. The Maryland National Capital Park and Planning Commission has integrated Fellows' work into their programs on water resource and environmental planning; his approach also is being used for forest and water resource planning near Freiburg, Baden-Wurtemberg, West Germany.
Recent Progress in Engine Noise Reduction Technologies
NASA Technical Reports Server (NTRS)
Huff, Dennis; Gliebe, Philip
2003-01-01
Highlights from NASA-funded research over the past ten years for aircraft engine noise reduction are presented showing overall technical plans, accomplishments, and selected applications to turbofan engines. The work was sponsored by NASA's Advanced Subsonic Technology (AST) Noise Reduction Program. Emphasis is given to only the engine noise reduction research and significant accomplishments that were investigated at Technology Readiness Levels ranging from 4 to 6. The Engine Noise Reduction sub-element was divided into four work areas: source noise prediction, model scale tests, engine validation, and active noise control. Highlights from each area include technologies for higher bypass ratio turbofans, scarf inlets, forward-swept fans, swept and leaned stators, chevron/tabbed nozzles, advanced noise prediction analyses, and active noise control for fans. Finally, an industry perspective is given from General Electric Aircraft Engines showing how these technologies are being applied to commercial products. This publication contains only presentation vu-graphs from an invited lecture given at the 41st AIAA Aerospace Sciences Meeting, January 6-9, 2003.
148. ARAIII Reactor building (ARA608) Floor plan. Shows location of ...
148. ARA-III Reactor building (ARA-608) Floor plan. Shows location of reactor, heater, and mechanical loop pits; mechanical and electrical equipment rooms; and other work areas. Aerojet-general 880-area/GCRE-608-A-1. Date: February 1958. Ineel index code no. 063-0608-00-013-102612. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID
Burton, R; Mauk, D
1993-03-01
By integrating customer satisfaction planning and industrial engineering techniques when examining internal costs and efficiencies, materiel managers are able to better realize what concepts will best meet their customers' needs. Defining your customer(s), applying industrial engineering techniques, completing work sampling studies, itemizing recommendations and benefits to each alternative, performing feasibility and cost-analysis matrixes and utilizing resources through productivity monitoring will get you on the right path toward selecting concepts to use. This article reviews the above procedures as they applied to one hospital's decision-making process to determine whether to incorporate a stockless inventory program. Through an analysis of customer demand, the hospital realized that stockless was the way to go, but not by outsourcing the function--the hospital incorporated an in-house stockless inventory program.
Code of Federal Regulations, 2012 CFR
2012-07-01
... Hazardous Air Pollutants for Industrial, Commercial, and Institutional Boilers Area Sources Pt. 63, Subpt... of available architectural and engineering plans, facility operation and maintenance procedures and...
Code of Federal Regulations, 2011 CFR
2011-07-01
... Hazardous Air Pollutants for Industrial, Commercial, and Institutional Boilers Area Sources Pt. 63, Subpt... of available architectural and engineering plans, facility operation and maintenance procedures and...
How to Do Science From an Engineering Organization
NASA Technical Reports Server (NTRS)
Suggs, Robert M.
2003-01-01
MSFC's Space Environments Team performs engineering support for a number of NASA spaceflight projects by defining the space environment, developing design requirements, supporting the design process, and supporting operations. Examples of this type of support are given including meteoroid environment work for the Jovian Icy Moon Orbiter mission, ionizing radiation support for the Chandra X-Ray Observatory, and astronomicaVgeophysica1 observation planning for International Space Station.
ERIC Educational Resources Information Center
Liu, Shu; Ma, Peijun; Li, Dong
2012-01-01
The current education model and practices in the Higher education sector in China have been successful in educating students for academic excellence, for producing industry-linked and practice-oriented graduates, who could quickly fit into the industrial working environment, has been a problem. There is a big gap between the theoretical knowledge…
A candidate architecture for monitoring and control in chemical transfer propulsion systems
NASA Technical Reports Server (NTRS)
Binder, Michael P.; Millis, Marc G.
1990-01-01
To support the exploration of space, a reusable space-based rocket engine must be developed. This engine must sustain superior operability and man-rated levels of reliability over several missions with limited maintenance or inspection between flights. To meet these requirements, an expander cycle engine incorporating a highly capable control and health monitoring system is planned. Alternatives for the functional organization and the implementation architecture of the engine's monitoring and control system are discussed. On the basis of this discussion, a decentralized architecture is favored. The trade-offs between several implementation options are outlined and future work is proposed.
Code of Federal Regulations, 2014 CFR
2014-07-01
... economic investigations or studies, surveys, designs, plans, working drawings, specifications, procedures... design-type projects within the scope of the practice of architecture or professional engineering as... as designed. (10) Collector sewer. The common lateral sewers, within a publicly owned treatment...
Code of Federal Regulations, 2011 CFR
2011-07-01
... economic investigations or studies, surveys, designs, plans, working drawings, specifications, procedures... design-type projects within the scope of the practice of architecture or professional engineering as... as designed. (10) Collector sewer. The common lateral sewers, within a publicly owned treatment...
17. Truss suspended column, industrial loft building, looking at southeast ...
17. Truss suspended column, industrial loft building, looking at southeast corner. Note open floor plan as a result of the floor beams being suspended from above. - Dry Dock Engine Works, 1801 Atwater Street, Detroit, MI
Independent Peer Review of the MOVES Design and Emissions Analysis Plans, and Addendum
Southwest Research Institute (SwRI) prepared this report for a work assignment under the EPA contract “Testing and Analytical Support for Regulation of Motor Vehicles, Engines, Fuels, and Fuel Additives.”
NASA Technical Reports Server (NTRS)
Litt, Jonathan S.; Wong, Edmond; Krasowski, Michael J.; Greer, Lawrence C.
2003-01-01
Cooperative behavior algorithms utilizing swarm intelligence are being developed for mobile sensor platforms to inspect jet engines on-wing. Experiments are planned in which several relatively simple autonomous platforms will work together in a coordinated fashion to carry out complex maintenance-type tasks within the constrained working environment modeled on the interior of a turbofan engine. The algorithms will emphasize distribution of the tasks among multiple units; they will be scalable and flexible so that units may be added in the future; and will be designed to operate on an individual unit level to produce the desired global effect. This proof of concept demonstration will validate the algorithms and provide justification for further miniaturization and specialization of the hardware toward the true application of on-wing in situ turbine engine maintenance.
143. ARAIII Control building (ARA607) Floor plan. Shows control room, ...
143. ARA-III Control building (ARA-607) Floor plan. Shows control room, contaminated work area, counting and computer room, health physics room, instrument repair room, offices, and other rooms. Aerojet-general 880-area/GCRE-607-A-1. Date: February 1958. Ineel index code no. 063-0607-00-013-102546. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID
Predicting on-site environmental impacts of municipal engineering works
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gangolells, Marta, E-mail: marta.gangolells@upc.edu; Casals, Miquel, E-mail: miquel.casals@upc.edu; Forcada, Núria, E-mail: nuria.forcada@upc.edu
2014-01-15
The research findings fill a gap in the body of knowledge by presenting an effective way to evaluate the significance of on-site environmental impacts of municipal engineering works prior to the construction stage. First, 42 on-site environmental impacts of municipal engineering works were identified by means of a process-oriented approach. Then, 46 indicators and their corresponding significance limits were determined on the basis of a statistical analysis of 25 new-build and remodelling municipal engineering projects. In order to ensure the objectivity of the assessment process, direct and indirect indicators were always based on quantitative data from the municipal engineering projectmore » documents. Finally, two case studies were analysed and found to illustrate the practical use of the proposed model. The model highlights the significant environmental impacts of a particular municipal engineering project prior to the construction stage. Consequently, preventive actions can be planned and implemented during on-site activities. The results of the model also allow a comparison of proposed municipal engineering projects and alternatives with respect to the overall on-site environmental impact and the absolute importance of a particular environmental aspect. These findings are useful within the framework of the environmental impact assessment process, as they help to improve the identification and evaluation of on-site environmental aspects of municipal engineering works. The findings may also be of use to construction companies that are willing to implement an environmental management system or simply wish to improve on-site environmental performance in municipal engineering projects. -- Highlights: • We present a model to predict the environmental impacts of municipal engineering works. • It highlights significant on-site environmental impacts prior to the construction stage. • Findings are useful within the environmental impact assessment process. • They also help contractors to implement environmental management systems.« less
NASA Astrophysics Data System (ADS)
Gold, Zachary Samuel
Engineering play is a new perspective on preschool education that views constructive play as an engineering design process that parallels the way engineers think and work when they develop engineered solutions to human problems (Bairaktarova, Evangelou, Bagiati, & Brophy, 2011). Early research from this perspective supports its use in framing play as a key learning context. However, no research to date has examined associations between engineering play and other factors linked with early school success, such as executive function, mathematical ability, and spatial ability. Additionally, more research is needed to further validate a new engineering play observational measure. This study had two main goals: (1) to gather early validity data on the engineering play measure as a potentially useful instrument for documenting the occurrence of children's engineering play behaviors in educational contexts, such as block play. This was done by testing the factor structure of the engineering play behaviors in this sample and their association with preschoolers' planning, a key aspect of the engineering design process; (2) to explore associations between preschoolers' engineering play and executive function, mathematical ability, and spatial ability. Participants included 110 preschoolers (62 girls; 48 boys; M = 58.47 months) from 10 classrooms in the Midwest United States coded for their frequency of engagement in each of the nine engineering play behaviors. A confirmatory factor analysis resulted in one engineering play factor including six of the engineering play behaviors. A series of marginal regression models revealed that the engineering play factor was significantly and positively associated with the spatial horizontal rotation transformation. However, engineering play was not significantly related to planning ability, executive function, informal mathematical abilities, or other spatial transformation skills. Follow-up analyses revealed significant positive associations between engineering play and planning, executive function, and geometry for only a subgroup of children (n = 27) who had individualized education program (IEP) status. This was the first of a series of studies planned to evaluate the potential of the engineering play perspective as a tool for understanding young children's development and learning across multiple developmental domains. Although most hypotheses regarding engineering play and cognitive skills were not supported, the study provided partial evidence for the reliability and validity of the engineering play observation measure. Future research should include larger sample sizes with more statistical power, continued refinement of the engineering play observation measure, examination of potential associations with specific early learning domains, including spatial ability and language, and more comparisons of engineering play between typically developing children and children with disabilities.
JPL Contamination Control Engineering
NASA Technical Reports Server (NTRS)
Blakkolb, Brian
2013-01-01
JPL has extensive expertise fielding contamination sensitive missions-in house and with our NASA/industry/academic partners.t Development and implementation of performance-driven cleanliness requirements for a wide range missions and payloads - UV-Vis-IR: GALEX, Dawn, Juno, WFPC-II, AIRS, TES, et al - Propulsion, thermal control, robotic sample acquisition systems. Contamination control engineering across the mission life cycle: - System and payload requirements derivation, analysis, and contamination control implementation plans - Hardware Design, Risk trades, Requirements V-V - Assembly, Integration & Test planning and implementation - Launch site operations and launch vehicle/payload integration - Flight ops center dot Personnel on staff have expertise with space materials development and flight experiments. JPL has capabilities and expertise to successfully address contamination issues presented by space and habitable environments. JPL has extensive experience fielding and managing contamination sensitive missions. Excellent working relationship with the aerospace contamination control engineering community/.
38. Photograph of a line drawing. 'PART III, SECTION 1, ...
38. Photograph of a line drawing. 'PART III, SECTION 1, EQUIPMENT LAYOUT, BUILDINGS G-1 TO G-10 INCL., PURIFICATION, MANUFACTURING AREA, PLAN 'B'.' From U.S. Army Corps of Engineers. Industrial Facilities Inventory, Holston Ordnance Works, Kingsport, Tennessee. Plant B, Parts II, III. (Nashville, TN: Office of District Engineer, 1944). - Holston Army Ammunition Plant, RDX-and-Composition-B Manufacturing Line 9, Kingsport, Sullivan County, TN
2014-01-01
modify previously authorized but unconstructed projects as needed to meet current science and engineering standards. Based on these completed...Everglades Planning Project feasibility report, which incorporates updated science and technical information gained over the last decade, was completed...report of the President’s Council of Advisors on Science and Technology on Sustaining Environmental Capital, recently formed a Biodiversity and Ecosystem
Virginia Demonstration Project Encouraging Middle School Students in Pursuing STEM Careers
NASA Technical Reports Server (NTRS)
Bachman, Jane T.; Kota, Dena H.; Kota, Aaron J.
2011-01-01
Encouraging students at all grade levels to consider pursuing a career in Science, Technology, Engineering, and Mathematics (STEM) fields i s a national focus. In 2005, the Naval Surface Warfare Center, Dahlgren Division (NSWCDD), a Department of Defense laboratory located in Da hlgren, Virginia, began work on the Virginia Demonstration Project (VDP) with the goal of increasing more student interest in STEM educatio n and pursuing STEM careers. This goal continues as the program enters its sixth year. This project has been successful through the partici pation of NSWCDD's scientists and engineers who are trained as mentor s to work in local middle school classrooms throughout the school year, As an extension of the in-class activities, several STEM summer aca demies have been conducted at NSWCDD, These academies are supported by the Navy through the VDP and the STEM Learning Module Project. These projects are part of more extensive outreach efforts offered by the National Defense Education Program (NDEP), sponsored by the Director, Defense Research and Engineering. The focus of this paper is on the types of activities conducted at the summer academy, an overview of the academy planning process, and recommendations to help support a nati onal plan of integrating modeling and simulation-based engineering and science into all grade levels. based upon the lessons learned
NASA Technical Reports Server (NTRS)
Singh, Rajendra; Houser, Donald R.
1993-01-01
This paper discusses analytical and experimental approaches that will be needed to understand dynamic, vibro-acoustic and design characteristics of high power density rotorcraft transmissions. Complexities associated with mathematical modeling of such systems will be discussed. An overview of research work planned during the next several years will be presented, with emphasis on engineering science issues such as gear contact mechanics, multi-mesh drive dynamics, parameter uncertainties, vibration transmission through bearings, and vibro-acoustic characteristics of geared rotor systems and housing-mount structures. A few examples of work in progress are cited.
NASA Astrophysics Data System (ADS)
Liu, Zhijun; Zhang, Liangpei; Liu, Zhenmin; Jiao, Hongbo; Chen, Liqun
2008-12-01
In order to manage the internal resources of Gulf of Tonkin and integrate multiple-source spatial data, the establishment of region unified plan management system is needed. The data fusion and the integrated research should be carried on because there are some difficulties in the course of the system's establishment. For example, kinds of planning and the project data format are different, and data criterion is not unified. Besides, the time state property is strong, and spatial reference is inconsistent, etc. In this article the ARCGIS ENGINE is introduced as the developing platform, key technologies are researched, such as multiple-source data transformation and fusion, remote sensing data and DEM fusion and integrated, plan and project data integration, and so on. Practice shows that the system improves the working efficiency of Guangxi Gulf of Tonkin Economic Zone Management Committee significantly and promotes planning construction work of the economic zone remarkably.
Integrating International Engineering Organizations For Successful ISS Operations
NASA Technical Reports Server (NTRS)
Blome, Elizabeth; Duggan, Matt; Patten, L.; Pieterek, Hhtrud
2006-01-01
The International Space Station (ISS) is a multinational orbiting space laboratory that is built in cooperation with 16 nations. The design and sustaining engineering expertise is spread worldwide. As the number of Partners with orbiting elements on the ISS grows, the challenge NASA is facing as the ISS integrator is to ensure that engineering expertise and data are accessible in a timely fashion to ensure ongoing operations and mission success. Integrating international engineering teams requires definition and agreement on common processes and responsibilities, joint training and the emergence of a unique engineering team culture. ISS engineers face daunting logistical and political challenges regarding data sharing requirements. To assure systematic information sharing and anomaly resolution of integrated anomalies, the ISS Partners are developing multi-lateral engineering interface procedures. Data sharing and individual responsibility are key aspects of this plan. This paper describes several examples of successful multilateral anomaly resolution. These successes were used to form the framework of the Partner to Partner engineering interface procedures, and this paper describes those currently documented multilateral engineering processes. Furthermore, it addresses the challenges experienced to date, and the forward work expected in establishing a successful working relationship with Partners as their hardware is launched.
Turbine Engine Hot Section Technology (HOST)
NASA Technical Reports Server (NTRS)
1983-01-01
A two-day workshop on the research and plans for turbine engine hot section durability problems was held on October 25 and 26, 1983, at the NASA Lewis Research Center. Presentations were made during six sessions, including structural analysis, fatigue and fracture, surface protective coatings, combustion, turbine heat transfer, and instrumentation, that dealt with the thermal and fluid environment around liners, blades, and vanes, and with material coatings, constitutive behavior, stress-strain response, and life prediction methods for the three components. The principal objective of each session was to disseminate the research results to date, along with future plans, in each of the six areas. Contract and government researchers presented results of their work.
NASA Astrophysics Data System (ADS)
White, K. D.; Huang, N.; Huber, M.; Veatch, W.; Moritz, H.; Obrien, P. S.; Friedman, D.
2017-12-01
In 2013, the United States Army Corps of Engineers (USACE) issued guidance for all Civil Works activities to incorporate the effects of sea level change as described in three distinct planning scenarios.[1] These planning scenarios provided a useful framework to incorporate these effects into Civil Works activities, but required the manual calculation of these scenarios for a given gage and set of datum. To address this need, USACE developed the Sea Level Change Curve Calculator (SLCCC) in 2014 which provided a "simple, web-based tool to provide repeatable analytical results."[2]USACE has been developing a successor to the SLCCC application which retains the same, intuitive functionality to calculate these planning scenarios, but it also allows the comparison of actual sea level change between 1992 and today against the projections, and builds on the user's ability to understand the rate of change using a variety of timeseries metrics (e.g. moving averages, trends) and related visualizations. These new metrics help both illustrate and measure the complexity and nuances of sea level change. [1] ER 1000-2-8162. http://www.publications.usace.army.mil/Portals/76/Publications/EngineerRegulations/ER_1100-2-8162.pdf. [2] SLCC Manual. http://www.corpsclimate.us/docs/SLC_Calculator_Manual_2014_88.pdf.
NASA Supportability Engineering Implementation Utilizing DoD Practices and Processes
NASA Technical Reports Server (NTRS)
Smith, David A.; Smith, John V.
2010-01-01
The Ares I design and development program made the determination early in the System Design Review Phase to utilize DoD ILS and LSA approach for supportability engineering as an integral part of the system engineering process. This paper is to provide a review of the overall approach to design Ares-I with an emphasis on a more affordable, supportable, and sustainable launch vehicle. Discussions will include the requirements development, design influence, support concept alternatives, ILS and LSA planning, Logistics support analyses/trades performed, LSA tailoring for NASA Ares Program, support system infrastructure identification, ILS Design Review documentation, Working Group coordination, and overall ILS implementation. At the outset, the Ares I Project initiated the development of the Integrated Logistics Support Plan (ILSP) and a Logistics Support Analysis process to provide a path forward for the management of the Ares-I ILS program and supportability analysis activities. The ILSP provide the initial planning and coordination between the Ares-I Project Elements and Ground Operation Project. The LSA process provided a system engineering approach in the development of the Ares-I supportability requirements; influence the design for supportability and development of alternative support concepts that satisfies the program operability requirements. The LSA planning and analysis results are documented in the Logistics Support Analysis Report. This document was required during the Ares-I System Design Review (SDR) and Preliminary Design Review (PDR) review cycles. To help coordinate the LSA process across the Ares-I project and between programs, the LSA Report is updated and released quarterly. A System Requirement Analysis was performed to determine the supportability requirements and technical performance measurements (TPMs). Two working groups were established to provide support in the management and implement the Ares-I ILS program, the Integrated Logistics Support Working Group (ILSWG) and the Logistics Support Analysis Record Working Group (LSARWG). The Ares I ILSWG is established to assess the requirements and conduct, evaluate analyses and trade studies associated with acquisition logistic and supportability processes and to resolve Ares I integrated logistics and supportability issues. It established a strategic collaborative alliance for coordination of Logistics Support Analysis activates in support of the integrated Ares I vehicle design and development of logistics support infrastructure. A Joint Ares I - Orion LSAR Working Group was established to: 1) Guide the development of Ares-I and Orion LSAR data and serve as a model for future Constellation programs, 2) Develop rules and assumptions that will apply across the Constellation program with regards to the program's LSAR development, and 3) Maintain the Constellation LSAR Style Guide.
Code of Federal Regulations, 2013 CFR
2013-10-01
... ordinarily should not be required, but if available should be considered); (2) Engineering work, production scheduling, planning, technical study and supervision, and other necessary services; (3) Efficiency of the contractor, with particular regard to— (i) Attainment of quantity and quality production; (ii) Reduction of...
Code of Federal Regulations, 2010 CFR
2010-04-01
... carpool lanes. Eligible work may include preliminary engineering to determine traffic flow and design criteria, signing, pavement markings, traffic control devices, and minor physical modifications to permit... any existing or planned mass transportation service, but should be designed so that the facility could...
Code of Federal Regulations, 2014 CFR
2014-04-01
... carpool lanes. Eligible work may include preliminary engineering to determine traffic flow and design criteria, signing, pavement markings, traffic control devices, and minor physical modifications to permit... any existing or planned mass transportation service, but should be designed so that the facility could...
Code of Federal Regulations, 2012 CFR
2012-04-01
... carpool lanes. Eligible work may include preliminary engineering to determine traffic flow and design criteria, signing, pavement markings, traffic control devices, and minor physical modifications to permit... any existing or planned mass transportation service, but should be designed so that the facility could...
Code of Federal Regulations, 2011 CFR
2011-04-01
... carpool lanes. Eligible work may include preliminary engineering to determine traffic flow and design criteria, signing, pavement markings, traffic control devices, and minor physical modifications to permit... any existing or planned mass transportation service, but should be designed so that the facility could...
Code of Federal Regulations, 2013 CFR
2013-04-01
... carpool lanes. Eligible work may include preliminary engineering to determine traffic flow and design criteria, signing, pavement markings, traffic control devices, and minor physical modifications to permit... any existing or planned mass transportation service, but should be designed so that the facility could...
DOT National Transportation Integrated Search
2015-02-01
Utilizing enhanced visualization in transportation planning and design gained popularity in the last decade. This work aimed at : demonstrating the concept of utilizing a highly immersive, virtual reality simulation engine for creating dynamic, inter...
STS-116 Crewmembers Curbeam and Williams work near P6 SAW during EVA 3
2006-12-17
S116-E-06603 (16 Dec. 2006) --- Astronauts Robert L. Curbeam, Jr., (red stripes), STS-116 mission specialist, and Sunita L. Williams, Expedition 14 flight engineer, work near the International Space Station's left P6 solar array wing during the mission's third planned session of extravehicular activity (EVA) as construction resumes on the International Space Station.
STS-116 Crewmembers Curbeam and Williams work near P6 SAW during EVA 3
2006-12-17
S116-E-06606 (16 Dec. 2006) --- Astronauts Robert L. Curbeam, Jr., (red stripes), STS-116 mission specialist, and Sunita L. Williams, Expedition 14 flight engineer, work near the International Space Station's left P6 solar array wing during the mission's third planned session of extravehicular activity (EVA) as construction resumes on the International Space Station.
NASA Technical Reports Server (NTRS)
1980-01-01
An updated program plan is presented showing the task descriptions depicting the work, progress, achievements, and the cause of any deviations from the original plan (SC-1), and how this impacted on the original schedule of the program. In addition there is an update documenting all design alterations made during the pre-production phase and a complete up to date set of engineering and manufacturing documentation (CM-1). The purpose of the work in the original plan was to explore, design, develop, test, and deliver 1000 watts of prototype flat plate, photovoltaic modules appropriate for use in applications in the 20 to 500 kilowatt range and which show potential for meeting the 1986 cost goals.
2008-05-01
Subcommittee on Oversight of Government Management, the Federal Workforce, and the District of Columbia Committee on Homeland Security and...allows flex-time, telecommuting , or alternative work schedules. Page 17 GAO-08-596 Corps of Engineers Table 1: Examples of Human Capital...programs and policies; and provides analyses, recommendations, and other assistance to help Congress make informed oversight , policy, and funding
2016-01-01
carpentry, masonry , and the operation of heavy equipment. Plans called for the NEB to receive at least $29 million in engineering equipment and...JTF Sapper, NMCB 25, and NMCB 28, had responsibility for training the NEB in such areas as plumbing, electrical work, carpentry, masonry , and...measurement tool consisted of five possible ratings: fully capable, capable, partially capable, developing, and established. USFOR-A used these
2007-05-17
metadata formats, metadata repositories, enterprise portals and federated search engines that make data visible, available, and usable to users...and provides the metadata formats, metadata repositories, enterprise portals and federated search engines that make data visible, available, and...develop an enterprise- wide data sharing plan, establishment of mission area governance processes for CIOs, DISA development of federated search specifications
CrossTalk: The Journal of Defense Software Engineering. Volume 20, Number 3, March 2007
2007-03-01
Capability Maturity Model ® Integration (CMMI®). CMU Software Engineering Institute <www.sei.cmu.edu/cmmi>. 5. ISO /IEC 27001 :2005. Information Security...international standards bodies – International Organization for Standardi- zation ( ISO ) and International Electro- technical Commission (IEC) – are working on a...number of projects that affect soft- ware security: • The ISO Technical Management Board (TMB) performs strategic planning and coordination for ISO
Engineering America's Future in Space: Systems Engineering Innovations for Sustainable Exploration
NASA Technical Reports Server (NTRS)
Dumbacher, Daniel L.; Jones, Carl P.
2008-01-01
The National Aeronautics and Space Administration (NASA) delivers space transportation solutions for America's complex missions, ranging from scientific payloads that expand knowledge, such as the Hubble Space Telescope, to astronauts and lunar rovers destined for voyages to the Moon. Currently, the venerable Space Shuttle, which has been in service since 1981, provides U.S. capability for both crew and cargo to low-Earth orbit to construct the International Space Station, before the Shuttle is retired in 2010, as outlined in the 2006 NASA Strategic Plan. I In the next decade, NASA will replace this system with a duo of launch vehicles: the Ares I Crew Launch Vehicle/Orion Crew Exploration Vehicle and the Ares V Cargo Launch Vehicle/Altair Lunar Lander. The goals for this new system include increased safety and reliability, coupled with lower operations costs that promote sustainable space exploration over a multi-decade schedule. This paper will provide details of the in-house systems engineering and vehicle integration work now being performed for the Ares I and planned for the Ares V. It will give an overview of the Ares I system-level test activities, such as the ground vibration testing that will be conducted in the Marshall Center's Dynamic Test Stand to verify the integrated vehicle stack's structural integrity against predictions made by modern modeling and simulation analysis. It also will give information about the work in progress for the Ares I-X developmental test flight planned in 2009 to provide key data before the Ares I Critical Design Review. Activities such as these will help prove and refine mission concepts of operation, while supporting the spectrum of design and development tasks being performed by Marshall's Engineering Directorate, ranging from launch vehicles and lunar rovers to scientific spacecraft and associated experiments. Ultimately, the work performed will lead to the fielding of a robust space transportation solution that will carry international explorers and essential payloads for sustainable scientific discovery beyond planet Earth.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Robertson, SP; Moore, JA; Hui, X
Purpose: Database dose predictions and a commercial autoplanning engine both improve treatment plan quality in different but complimentary ways. The combination of these planning techniques is hypothesized to further improve plan quality. Methods: Four treatment plans were generated for each of 10 head and neck (HN) and 10 prostate cancer patients, including Plan-A: traditional IMRT optimization using clinically relevant default objectives; Plan-B: traditional IMRT optimization using database dose predictions; Plan-C: autoplanning using default objectives; and Plan-D: autoplanning using database dose predictions. One optimization was used for each planning method. Dose distributions were normalized to 95% of the planning target volumemore » (prostate: 8000 cGy; HN: 7000 cGy). Objectives used in plan optimization and analysis were the larynx (25%, 50%, 90%), left and right parotid glands (50%, 85%), spinal cord (0%, 50%), rectum and bladder (0%, 20%, 50%, 80%), and left and right femoral heads (0%, 70%). Results: All objectives except larynx 25% and 50% resulted in statistically significant differences between plans (Friedman’s χ{sup 2} ≥ 11.2; p ≤ 0.011). Maximum dose to the rectum (Plans A-D: 8328, 8395, 8489, 8537 cGy) and bladder (Plans A-D: 8403, 8448, 8527, 8569 cGy) were significantly increased. All other significant differences reflected a decrease in dose. Plans B-D were significantly different from Plan-A for 3, 17, and 19 objectives, respectively. Plans C-D were also significantly different from Plan-B for 8 and 13 objectives, respectively. In one case (cord 50%), Plan-D provided significantly lower dose than plan C (p = 0.003). Conclusion: Combining database dose predictions with a commercial autoplanning engine resulted in significant plan quality differences for the greatest number of objectives. This translated to plan quality improvements in most cases, although special care may be needed for maximum dose constraints. Further evaluation is warranted in a larger cohort across HN, prostate, and other treatment sites. This work is supported by Philips Radiation Oncology Systems.« less
Project-based learning as a contributing factor to graduates' work readiness
NASA Astrophysics Data System (ADS)
Jollands, Margaret; Jolly, Lesley; Molyneaux, Tom
2012-05-01
This paper explores what work readiness means for two cohorts of graduate engineers, one from a traditional curriculum, the second from a largely project-based curriculum. Professional bodies and employers have defined a set of attributes for engineering graduates so that graduates will be 'work ready'. Problem-based learning (PBL) is claimed to be a suitable approach to develop such skills. The graduates were interviewed some months after starting work, along with their managers. All the graduates recognised the benefits of taking PBL subjects as well as vacation work, with success in communication attributed more to PBL. Both cohorts had similar learning outcomes, high skill levels in project management, problem solving, communication skills, research and sustainability. A skills gap in ethics was identified for both cohorts of graduates and their managers. Further work is planned to link skill development with undergraduate learning experience.
Planning, scheduling, and control for automatic telescopes
NASA Technical Reports Server (NTRS)
Drummond, Mark; Swanson, Keith; Philips, Andy; Levinson, Rich; Bresina, John
1992-01-01
This paper presents an argument for the appropriateness of Entropy Reduction Engine (ERE) technology to the planning, scheduling, and control components of Automatic Photoelectric Telescope (APT) management. The paper is organized as follows. In the next section, we give a brief summary of the planning and scheduling requirements for APTs. Following this, in section 3, we give an ERE project precis, couched primarily in terms of project objectives. Section 4 gives a sketch of the match-up between problem and technology, and section 5 outlines where we want to go with this work.
Teachers' Integration of Scientific and Engineering Practices in Primary Classrooms
NASA Astrophysics Data System (ADS)
Merritt, Eileen G.; Chiu, Jennie; Peters-Burton, Erin; Bell, Randy
2017-06-01
The Next-Generation Science Standards (NGSS) challenge primary teachers and students to work and think like scientists and engineers as they strive to understand complex concepts. Teachers and teacher educators can leverage what is already known about inquiry teaching as they plan instruction to help students meet the new standards. This cross-case analysis of a multiple case study examined teacher practices in the context of a semester-long professional development course for elementary teachers. We reviewed lessons and teacher reflections, examining how kindergarten and first grade teachers incorporated NGSS scientific and engineering practices during inquiry-based instruction. We found that most of the teachers worked with their students on asking questions; planning and carrying out investigations; analyzing and interpreting data, using mathematics and computational thinking; and obtaining, evaluating and communicating information. Teachers faced challenges in supporting students in developing their own questions that could be investigated and using data collection strategies that aligned with students' development of number sense concepts. Also, some teachers overemphasized the scientific method and lacked clarity in how they elicited and responded to student predictions. Discussion focuses on teacher supports that will be needed as states transition to NGSS.
Air Tight: Building Inflatables/Inflatable Construction: Planning and Details
NASA Technical Reports Server (NTRS)
Kennedy, Kriss J.
2016-01-01
A design-build seminar consisting of students from Physics, Mechanical and Civil Engineering, Robotic, Material Science, Art, and Architecture who will work together on a deployable "closed-loop" inflatable greenhouse for Mars in theory, and an Earth analogue physical mockup on campus.
Fuzzy linear model for production optimization of mining systems with multiple entities
NASA Astrophysics Data System (ADS)
Vujic, Slobodan; Benovic, Tomo; Miljanovic, Igor; Hudej, Marjan; Milutinovic, Aleksandar; Pavlovic, Petar
2011-12-01
Planning and production optimization within multiple mines or several work sites (entities) mining systems by using fuzzy linear programming (LP) was studied. LP is the most commonly used operations research methods in mining engineering. After the introductory review of properties and limitations of applying LP, short reviews of the general settings of deterministic and fuzzy LP models are presented. With the purpose of comparative analysis, the application of both LP models is presented using the example of the Bauxite Basin Niksic with five mines. After the assessment, LP is an efficient mathematical modeling tool in production planning and solving many other single-criteria optimization problems of mining engineering. After the comparison of advantages and deficiencies of both deterministic and fuzzy LP models, the conclusion presents benefits of the fuzzy LP model but is also stating that seeking the optimal plan of production means to accomplish the overall analysis that will encompass the LP model approaches.
TU-EF-304-03: 4D Monte Carlo Robustness Test for Proton Therapy
DOE Office of Scientific and Technical Information (OSTI.GOV)
Souris, K; Sterpin, E; Lee, J
Purpose: Breathing motion and approximate dose calculation engines may increase proton range uncertainties. We address these two issues using a comprehensive 4D robustness evaluation tool based on an efficient Monte Carlo (MC) engine, which can simulate breathing with no significant increase in computation time. Methods: To assess the robustness of the treatment plan, multiple scenarios of uncertainties are simulated, taking into account the systematic and random setup errors, range uncertainties, and organ motion. Our fast MC dose engine, called MCsquare, implements optimized models on a massively-parallel computation architecture and allows us to accurately simulate a scenario in less than onemore » minute. The deviations of the uncertainty scenarios are then reported on a DVH-band and compared to the nominal plan.The robustness evaluation tool is illustrated in a lung case by comparing three 60Gy treatment plans. First, a plan is optimized on a PTV obtained by extending the CTV with an 8mm margin, in order to take into account systematic geometrical uncertainties, like in our current practice in radiotherapy. No specific strategy is employed to correct for tumor and organ motions. The second plan involves a PTV generated from the ITV, which encompasses the tumor volume in all breathing phases. The last plan results from robust optimization performed on the ITV, with robustness parameters of 3% for tissue density and 8 mm for positioning errors. Results: The robustness test revealed that the first two plans could not properly cover the target in the presence of uncertainties. CTV-coverage (D95) in the three plans ranged respectively between 39.4–55.5Gy, 50.2–57.5Gy, and 55.1–58.6Gy. Conclusion: A realistic robustness verification tool based on a fast MC dose engine has been developed. This test is essential to assess the quality of proton therapy plan and very useful to study various planning strategies for mobile tumors. This work is partly funded by IBA (Louvain-la-Neuve, Belgium)« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Saw, C; Baikadi, M; Peters, C
2015-06-15
Purpose: Using systems engineering to design HDR skin treatment operation for small lesions using shielded applicators to enhance patient safety. Methods: Systems engineering is an interdisciplinary field that offers formal methodologies to study, design, implement, and manage complex engineering systems as a whole over their life-cycles. The methodologies deal with human work-processes, coordination of different team, optimization, and risk management. The V-model of systems engineering emphasize two streams, the specification and the testing streams. The specification stream consists of user requirements, functional requirements, and design specifications while the testing on installation, operational, and performance specifications. In implementing system engineering tomore » this project, the user and functional requirements are (a) HDR unit parameters be downloaded from the treatment planning system, (b) dwell times and positions be generated by treatment planning system, (c) source decay be computer calculated, (d) a double-check system of treatment parameters to comply with the NRC regulation. These requirements are intended to reduce human intervention to improve patient safety. Results: A formal investigation indicated that the user requirements can be satisfied. The treatment operation consists of using the treatment planning system to generate a pseudo plan that is adjusted for different shielded applicators to compute the dwell times. The dwell positions, channel numbers, and the dwell times are verified by the medical physicist and downloaded into the HDR unit. The decayed source strength is transferred to a spreadsheet that computes the dwell times based on the type of applicators and prescribed dose used. Prior to treatment, the source strength, dwell times, dwell positions, and channel numbers are double-checked by the radiation oncologist. No dosimetric parameters are manually calculated. Conclusion: Systems engineering provides methodologies to effectively design the HDR treatment operation that minimize human intervention and improve patient safety.« less
Software engineering project management - A state-of-the-art report
NASA Technical Reports Server (NTRS)
Thayer, R. H.; Lehman, J. H.
1977-01-01
The management of software engineering projects in the aerospace industry was investigated. The survey assessed such features as contract type, specification preparation techniques, software documentation required by customers, planning and cost-estimating, quality control, the use of advanced program practices, software tools and test procedures, the education levels of project managers, programmers and analysts, work assignment, automatic software monitoring capabilities, design and coding reviews, production times, success rates, and organizational structure of the projects.
ERIC Educational Resources Information Center
Kastens, Kim; Krumhansl, Ruth; Baker, Irene
2015-01-01
This article is aimed at teachers already experienced with activities involving small, student-collected data sets and who are now ready to begin working with large, online data sets collected by scientists and engineers. The authors discuss challenges, instructional strategies, and sources of appropriate lesson plans. With guidance, plus online…
7 CFR 1710.251 - Construction work plans-distribution borrowers.
Code of Federal Regulations, 2011 CFR
2011-01-01
... generation facilities; (11) Load management equipment, automatic sectionalizing facilities, and centralized... transmission plant, and improvements replacements, and retirements of any generation plant. Construction of new generation capacity need not be included in a CWP but must be specified and supported by specific engineering...
NASA Technical Reports Server (NTRS)
2008-01-01
NASA s advanced visual simulations are essential for analyses associated with life cycle planning, design, training, testing, operations, and evaluation. Kennedy Space Center, in particular, uses simulations for ground services and space exploration planning in an effort to reduce risk and costs while improving safety and performance. However, it has been difficult to circulate and share the results of simulation tools among the field centers, and distance and travel expenses have made timely collaboration even harder. In response, NASA joined with Valador Inc. to develop the Distributed Observer Network (DON), a collaborative environment that leverages game technology to bring 3-D simulations to conventional desktop and laptop computers. DON enables teams of engineers working on design and operations to view and collaborate on 3-D representations of data generated by authoritative tools. DON takes models and telemetry from these sources and, using commercial game engine technology, displays the simulation results in a 3-D visual environment. Multiple widely dispersed users, working individually or in groups, can view and analyze simulation results on desktop and laptop computers in real time.
Tucker, D M; Wenckus, C S; Bentkover, S K
1997-03-01
Twenty-two mesial roots of extracted human mandibular molars were divided into two groups based on root curvature and length. The mesiolingual canals were instrumented using either Flexofiles in a step-back anticurvature filing method, or they were instrumented with engine-driven 0.02 taper nickel-titanium files. Ground sections were prepared at 1-, 2.5-, and 5-mm levels from the working length. The mesiobuccal canal was used as an uninstrumented control for predentin character. Digitizing software was used to calculate the instrumented portion as a percentage of the total canal perimeter. The results indicated no significant difference in overall canal wall planning between the two groups and no significant difference at each of the three levels.
NASA Technical Reports Server (NTRS)
Fordyce, Jess
1996-01-01
Work carried out to re-engineer the mission analysis segment of JPL's mission planning ground system architecture is reported on. The aim is to transform the existing software tools, originally developed for specific missions on different support environments, into an integrated, general purpose, multi-mission tool set. The issues considered are: the development of a partnership between software developers and users; the definition of key mission analysis functions; the development of a consensus based architecture; the move towards evolutionary change instead of revolutionary replacement; software reusability, and the minimization of future maintenance costs. The current status and aims of new developments are discussed and specific examples of cost savings and improved productivity are presented.
Tessonnier, Thomas; Mairani, Andrea; Chen, Wenjing; Sala, Paola; Cerutti, Francesco; Ferrari, Alfredo; Haberer, Thomas; Debus, Jürgen; Parodi, Katia
2018-01-09
Due to their favorable physical and biological properties, helium ion beams are increasingly considered a promising alternative to proton beams for radiation therapy. Hence, this work aims at comparing in-silico the treatment of brain and ocular meningiomas with protons and helium ions, using for the first time a dedicated Monte Carlo (MC) based treatment planning engine (MCTP) thoroughly validated both in terms of physical and biological models. Starting from clinical treatment plans of four patients undergoing proton therapy with a fixed relative biological effectiveness (RBE) of 1.1 and a fraction dose of 1.8 Gy(RBE), new treatment plans were optimized with MCTP for both protons (with variable and fixed RBE) and helium ions (with variable RBE) under the same constraints derived from the initial clinical plans. The resulting dose distributions were dosimetrically compared in terms of dose volume histograms (DVH) parameters for the planning target volume (PTV) and the organs at risk (OARs), as well as dose difference maps. In most of the cases helium ion plans provided a similar PTV coverage as protons with a consistent trend of superior OAR sparing. The latter finding was attributed to the ability of helium ions to offer sharper distal and lateral dose fall-offs, as well as a more favorable differential RBE variation in target and normal tissue. Although more studies are needed to investigate the clinical potential of helium ions for different tumour entities, the results of this work based on an experimentally validated MC engine support the promise of this modality with state-of-the-art pencil beam scanning delivery, especially in case of tumours growing in close proximity of multiple OARs such as meningiomas.
NASA Astrophysics Data System (ADS)
Harris, E.
Planning, Implementation and Optimization of Future Space Missions using an Immersive Visualization Environment (IVE) Machine E. N. Harris, Lockheed Martin Space Systems, Denver, CO and George.W. Morgenthaler, U. of Colorado at Boulder History: A team of 3-D engineering visualization experts at the Lockheed Martin Space Systems Company have developed innovative virtual prototyping simulation solutions for ground processing and real-time visualization of design and planning of aerospace missions over the past 6 years. At the University of Colorado, a team of 3-D visualization experts are developing the science of 3-D visualization and immersive visualization at the newly founded BP Center for Visualization, which began operations in October, 2001. (See IAF/IAA-01-13.2.09, "The Use of 3-D Immersive Visualization Environments (IVEs) to Plan Space Missions," G. A. Dorn and G. W. Morgenthaler.) Progressing from Today's 3-D Engineering Simulations to Tomorrow's 3-D IVE Mission Planning, Simulation and Optimization Techniques: 3-D (IVEs) and visualization simulation tools can be combined for efficient planning and design engineering of future aerospace exploration and commercial missions. This technology is currently being developed and will be demonstrated by Lockheed Martin in the (IVE) at the BP Center using virtual simulation for clearance checks, collision detection, ergonomics and reach-ability analyses to develop fabrication and processing flows for spacecraft and launch vehicle ground support operations and to optimize mission architecture and vehicle design subject to realistic constraints. Demonstrations: Immediate aerospace applications to be demonstrated include developing streamlined processing flows for Reusable Space Transportation Systems and Atlas Launch Vehicle operations and Mars Polar Lander visual work instructions. Long-range goals include future international human and robotic space exploration missions such as the development of a Mars Reconnaissance Orbiter and Lunar Base construction scenarios. Innovative solutions utilizing Immersive Visualization provide the key to streamlining the mission planning and optimizing engineering design phases of future aerospace missions.
EARLY ENTRANCE COPRODUCTION PLANT
DOE Office of Scientific and Technical Information (OSTI.GOV)
David Storm; Govanon Nongbri; Steve Decanio
2004-01-12
The overall objective of this project is the three phase development of an Early Entrance Coproduction Plant (EECP) which uses petroleum coke to produce at least one product from at least two of the following three categories: (1) electric power (or heat), (2) fuels, and (3) chemicals using ChevronTexaco's proprietary gasification technology. The objective of Phase I is to determine the feasibility and define the concept for the EECP located at a specific site; develop a Research, Development, and Testing (RD&T) Plan to mitigate technical risks and barriers; and prepare a Preliminary Project Financing Plan. The objective of Phase IImore » is to implement the work as outlined in the Phase I RD&T Plan to enhance the development and commercial acceptance of coproduction technology. The objective of Phase III is to develop an engineering design package and a financing and testing plan for an EECP located at a specific site. The project's intended result is to provide the necessary technical, economic, and environmental information needed by industry to move the EECP forward to detailed design, construction, and operation. The partners in this project are Texaco Energy Systems LLC or TES (a subsidiary of ChevronTexaco), General Electric (GE), Praxair, and Kellogg Brown & Root (KBR) in addition to the U.S. Department of Energy (DOE). TES is providing gasification technology and Fischer-Tropsch (F-T) technology developed by Rentech, Inc., GE is providing combustion turbine technology, Praxair is providing air separation technology, and KBR is providing engineering. During Phase I, a design basis for the Fischer-Tropsch Synthesis section was developed based on limited experience with the specified feed gas and operating conditions. The objective of this Task in Phase II RD&T work was to confirm the performance of the F-T reactor at the set design conditions. Although much of the research, development, and testing work were done by TES outside of this project, several important issues were addressed in this phase of the project. They included Rejuvenation/Regeneration of the Fischer-Tropsch Catalyst, online Catalyst Withdrawal and Addition from the synthesis reactor, and the Fischer-Tropsch Design Basis Confirmation. In Phase III the results from these RD&T work will be incorporated in developing the engineering design package. This Topical Report documents the Phase II RD&T work that was completed for this task.« less
Creating Learning Environment Connecting Engineering Design and 3D Printing
NASA Astrophysics Data System (ADS)
Pikkarainen, Ari; Salminen, Antti; Piili, Heidi
Engineering education in modern days require continuous development in didactics, pedagogics and used practical methods. 3D printing provides excellent opportunity to connect different engineering areas into practice and produce learning by doing applications. The 3D-printing technology used in this study is FDM (Fused deposition modeling). FDM is the most used 3D-printing technology by commercial numbers at the moment and the qualities of the technology makes it popular especially in academic environments. For achieving the best result possible, students will incorporate the principles of DFAM (Design for additive manufacturing) into their engineering design studies together with 3D printing. This paper presents a plan for creating learning environment for mechanical engineering students combining the aspects of engineering design, 3D-CAD learning and AM (additive manufacturing). As a result, process charts for carrying out the 3D printing process from technological point of view and design process for AM from engineering design point of view were created. These charts are used in engineering design education. The learning environment is developed to work also as a platform for Bachelor theses, work-training environment for students, prototyping service centre for cooperation partners and source of information for mechanical engineering education in Lapland University of Applied Sciences.
46 CFR 107.305 - Plans and information.
Code of Federal Regulations, 2013 CFR
2013-10-01
... systems. Marine Engineering (z) Plans required for marine engineering equipment and systems by Subchapter F of this chapter. Electrical Engineering (aa) Plans required for electrical engineering equipment... materials that do not conform to ABS or ASTM specifications, complete specifications, including chemical and...
Handbook on Architectural Services.
ERIC Educational Resources Information Center
Adams, Hugh D.; And Others
Alabama State Building Commission policies and procedures are established for the use of all agencies, architects, and engineers working under the jurisdiction of the Commission. All school construction with the exception of mobile classroom units is covered, and general procedures are outlined followed by the requirements for plan submittals.…
DCSC (Defense Construction Supply Center) Total Quality Management Master Plan
1989-07-01
job while allowing them to establish a better balance between work and personal needs. 29 TQM SHORT-MID-LONG RANGE INITIATIVES MID RANGE (3 YEARS...all performance standards. IMPROVE THE QUALITY OF WORKLIFE - Projects requiring engineering support throughout FY 90 and beyond are: Construction of
Producibility Engineering and Planning (PEP)
1977-01-01
Materiel System, May 1976. c. Cesare Raimondi, "Estimating Drafting Time - Art , Science , Guess- work", Machine Design, 7 September 1972. d. Current Wage...Comprehensive 8 16 24 32 40 86 45 70 90 80 1/ Cesare Raimondi, "Estimating Drafting Time- Art , Science , Guesswork," Machine Design, September
Crater Morphology of Engineered and Natural Impactors into Planetary Ice
NASA Astrophysics Data System (ADS)
Danner, M.; Winglee, R.; Koch, J.
2017-12-01
Crater morphology of engineered impactors, such as those proposed for the Europa Kinetic Ice Penetrator (EKIP) mission, varies drastically from that of natural impactors (i.e. Asteroids, meteoroids). Previous work of natural impact craters in ice have been conducted with the intent to bound the thickness of Europa's ice crust; this work focuses on the depth, size, and compressional effects caused by various impactor designs, and the possible effects to the Europan surface. The present work details results from nine projectiles that were dropped on the Taku Glacier, AK at an altitude of 775 meters above surface; three rocks to simulate natural impactors, and six iterations of engineered steel and aluminum penetrator projectiles. Density measurements were taken at various locations within the craters, as well as through a cross section of the crater. Due to altitude restrictions, projectiles remained below terminal velocity. The natural/rock impact craters displayed typical cratering characteristics such as shallow, half meter scale depth, and orthogonal compressional forcing. The engineered projectiles produced impact craters with depths averaging two meters, with crater widths matching the impactor diameters. Compressional waves from the engineered impactors propagated downwards, parallel to direction of impact. Engineered impactors create significantly less lateral fracturing than natural impactors. Due to the EKIP landing mechanism, sampling of pristine ice closer to the lander is possible than previously thought with classical impact theory. Future work is planned to penetrate older, multiyear ice with higher velocity impacts.
A History of the Little Rock District U.S. Army Corps of Engineers 1881-1979
1979-01-01
establishments with overnight accommodations for 8,339 people. In 1940 there were only seven restaurants, cafes , and public dining rooms in the vicinity...that only one out of five docks located in Barry County is included in the franchise release re- quests." 54 • District’s Purple Martin program...benefit of their own citizens. The Engineers also expected communities to benefit from franchises to local concessionaires. The plan did not work out
Strategies for Improving Diversity at Bell Labs, Lucent Technologies
NASA Astrophysics Data System (ADS)
Murray, Cherry A.
2001-03-01
Over the last quarter century, top management in Bell Labs Research has initiated efforts to train, recruit, and encourage underrepresented minorities into science and engineering positions, and in hiring and retaining underrepresented minority scientists and engineers. I will give some historical background of some of the programs which have worked over the years and some of the new programs in recruiting, mentoring and career planning that we have recently initiated in order to better create a workplace that is accepting and even welcoming of diversity.
Qualitative and quantitative reasoning about thermodynamics
NASA Technical Reports Server (NTRS)
Skorstad, Gordon; Forbus, Ken
1989-01-01
One goal of qualitative physics is to capture the tacit knowledge of engineers and scientists. It is shown how Qualitative Process theory can be used to express concepts of engineering thermodynamics. In particular, it is shown how to integrate qualitative and quantitative knowledge to solve textbook problems involving thermodynamic cycles, such as gas turbine plants and steam power plants. These ideas were implemented in a program called SCHISM. Its analysis of a sample textbook problem is described and plans for future work are discussed.
1982-06-01
p*A C.._ _ __ _ _ A, d.tibutiou is unhimta 4 iit 84~ L0 TABLE OF CONTENTS APPENDIX SCOPE OF WORK B MERGE AND COST PROGRAM DOCUMENTATION C FATSCO... PROGRAM TO COMPUTE TIME SERIES FREQUENCY RELATIONSHIPS D HEC-DSS - TIME SERIES DATA FILE MANAGEMENT SYSTEM E PLAN 1 -TIM SERIES DATA PLOTS AND ANNUAL...University of Minnesota, utilized an early version of the Hydrologic Engineering * Center’s (HEC) EEC-5c Computer Program . EEC is a Corps of Engineers
2017-03-01
opportunities emerged. It will be essential to capture and share lessons learned as the two organizations plan and implement selected EWN projects...their top five or six opportunities and subsequently selected the two highest priorities. Each of the three breakout groups then worked together to...will ensure agency buy-in, establish local reference sites, and promote EWN principles. Site selection will include an iterative process that factors
AGOR 28: SIO Shipyard Representative Bi-Weekly Progress Report
2015-07-30
sides of the lower engine room still have sections of bare acoustic tile that require thermal insulation and Quad-Zero • Main Deck Noise Levels, Sally...for Sally Ride. ii. Working on NS5 Hierarchy 4. Operator Concerns: • Acoustic Tiles & MLV – No additional tiles have been removed this...reporting period. DCI has no plans to remove any more per USCG. No indication as to what sound treatment will be placed in the engine room bilge or on
2011-03-01
input spindle from the engine to over tighten and apply an even greater amount of resistance to the engine shaft . Not only was this dangerous to...Mengistu, Todd Rotramel, and Matt Rippl, all of whom worked together with me to design and build the test rig for our dynamometer setup. Countless...hours were spent together planning and executing the design and building the stand itself. The AFIT machine shop crew and ENY lab techs also
ALARA database value in future outage work planning and dose management
DOE Office of Scientific and Technical Information (OSTI.GOV)
Miller, D.W.; Green, W.H.
1995-03-01
ALARA database encompassing job-specific duration and man-rem plant specific information over three refueling outages represents an invaluable tool for the outage work planner and ALARA engineer. This paper describes dose-management trends emerging based on analysis of three refueling outages at Clinton Power Station. Conclusions reached based on hard data available from a relational database dose-tracking system is a valuable tool for planning of future outage work. The system`s ability to identify key problem areas during a refueling outage is improving as more outage comparative data becomes available. Trends over a three outage period are identified in this paper in themore » categories of number and type of radiation work permits implemented, duration of jobs, projected vs. actual dose rates in work areas, and accuracy of outage person-rem projection. The value of the database in projecting 1 and 5 year station person-rem estimates is discussed.« less
NASA Astrophysics Data System (ADS)
Zagroba, Marek
2016-10-01
This paper deals with the conditions underlying and the problems arising from the siting of a building with specialist laboratories in a developed part of the university campus in Olsztyn, Poland. The topography of the terrain and the need to house civil engineering laboratories in the planned building had an immense impact on the shape of the building and consequently on its foundations, whose dimensions responded to the ground conditions and the specification of various loads they would have to support, including the equipment for the laboratories. The siting of a building as a step in the construction process entails several problems, which are first taken into consideration at the stage of making preliminary concept plans and are subsequently verified while working on the final construction plan. The required information included geotechnical documentation, survey of the ground conditions and the data regarding the predicted loads on the building, necessary to select the right type of foundations. All these problems grow in importance when dealing with such unique buildings like the discussed example of a laboratory building for the Civil Engineering Department, built on a site within a conservation zone on the campus of the University of Warmia and Mazury in Olsztyn, Poland. The specific character of the building and the specialist equipment with which it was to be furnished (a resistance testing machine, a 17-meter-long wave flume) necessitated a series of analyses prior to the siting of the building and selecting suitable foundations. In turn, the fact that the new building was to be erected in the conservation zone meant that collaboration with the Heritage Conservation Office had to be undertaken at the stage of making the plan and continued during the construction works. The Heritage Officer's recommendations concerning the building's shape, divisions, dimensions, materials used, etc., created a situation where the team of designers and architects had to become engaged in the process of landscape and spatial management. The above requirements concerned the functions of the building and its siting on a land parcel that was difficult to handle, also because of the protected trees growing there. Other constraints included the small size of this site, the developed surroundings, and the pre-defined programme of functions and use of the new building. On the other hand, the siting of the planned building had to be accommodated to the existing underground infrastructure (utilities). All the above circumstances made the task difficult and demanded good coordination between individual teams of engineers and architects, both at the stage of making the plan and during the construction works.
NASA Technical Reports Server (NTRS)
Bair, E. K.
1986-01-01
The System Trades Study and Design Methodology Plan is used to conduct trade studies to define the combination of Space Shuttle Main Engine features that will optimize candidate engine configurations. This is accomplished by using vehicle sensitivities and engine parametric data to establish engine chamber pressure and area ratio design points for candidate engine configurations. Engineering analyses are to be conducted to refine and optimize the candidate configurations at their design points. The optimized engine data and characteristics are then evaluated and compared against other candidates being considered. The Evaluation Criteria Plan is then used to compare and rank the optimized engine configurations on the basis of cost.
NASA Astrophysics Data System (ADS)
Arce, A.; Caniego, J.; Vazquez, J.; Serrano, A.; Tarquis, A. M.; Cartagena, M. C.
2012-04-01
The Bologna process is to improve the quality of education, mobility, diversity and the competitiveness and involves three fundamental changes: transform of the structure of titles, changing in methods of teaching and implementation of the systems of quality assurance. Once that the new degrees have been implemented with this structure, and began at E.T.S. of Agriculture Engineering (ETSIA) at Madrid from 2010-2011 course, the main aim of this work is to deeply study the changes in teaching methodology as well as progressively implementation of the educational planning of the three new degrees: Engineering and Agronomic Graduate, Food Industry Engineering Graduate and Agro-environmental Graduate. Each one of them presents 240 ECTS with a common first course and will have access to an official Master in Agronomic Engineering. As part as an educational innovation project awarded by the Technical University of Madrid (UPM) to improve educational quality, the second course has been designed with the main objective to continue the educative model implemented last course. This model identifies several teaching activities and represents a proper teaching style at ETSIA-UPM. At the same time, a monitoring and development coordination plans have been established. On the other hand, a procedure to extinguish the earlier plans of Agriculture Engineering was also defined. Other activities related to this Project were the information improvement of the grades, in particular at High Schools centers, improving the processes of reception, counseling and tutoring and mentoring. Likewise, cooperative working workshops and programs to support the teaching of English language were implemented. Satisfaction surveys and opinion polls were done to professors and students involved in first course in order to test several aspects of this project. The students surveys were analyzed taking in account the academic results and their participation in mentoring activities giving a highly satisfactory level. In general, the professors gave the same result although they pointed out certain discontent respect to some circumstances giving some solutions to correct these problems.
2017-01-23
5e. TASK NUMBER N/A 5f. WORK UNIT NUMBER N/A 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) AND ADDRESS(ES) RDECOM-TARDEC-ACT Attn...occupant work space, central 90% of the Soldier population, encumbrance, posture and position, verification and validation, computer aided design...factors engineers could benefit by working with vehicle designers to perform virtual assessments in CAD when there is not enough time and/or funding to
Surgeon Training in Telerobotic Surgery via a Hardware-in-the-Loop Simulator
Alemzadeh, Homa; Chen, Daniel; Kalbarczyk, Zbigniew; Iyer, Ravishankar K.; Kesavadas, Thenkurussi
2017-01-01
This work presents a software and hardware framework for a telerobotic surgery safety and motor skill training simulator. The aims are at providing trainees a comprehensive simulator for acquiring essential skills to perform telerobotic surgery. Existing commercial robotic surgery simulators lack features for safety training and optimal motion planning, which are critical factors in ensuring patient safety and efficiency in operation. In this work, we propose a hardware-in-the-loop simulator directly introducing these two features. The proposed simulator is built upon the Raven-II™ open source surgical robot, integrated with a physics engine and a safety hazard injection engine. Also, a Fast Marching Tree-based motion planning algorithm is used to help trainee learn the optimal instrument motion patterns. The main contributions of this work are (1) reproducing safety hazards events, related to da Vinci™ system, reported to the FDA MAUDE database, with a novel haptic feedback strategy to provide feedback to the operator when the underlying dynamics differ from the real robot's states so that the operator will be aware and can mitigate the negative impact of the safety-critical events, and (2) using motion planner to generate semioptimal path in an interactive robotic surgery training environment. PMID:29065635
Acoustic Engineering program at the Universidad Austral de Chile (UACh)
NASA Astrophysics Data System (ADS)
Sommerhoff, Jorge; Poblete, Victor; Arenas, Jorge P.
2002-11-01
From the beginning of the acoustics program at UACh in 1968, the studies of Acoustic Engineering have been modified and developed according to the vision and human resources of its developers. Three different stages of growth can be seen. When the program began, it was totally aimed at forming skilled professionals in audio and recording. In this way, the professional title given was Sound Engineer. At that time, each applicant was required to have ''good musical hearing,'' which had to be demonstrated through a special musical audition test. The second stage was characterized by the incorporation of acoustics subjects which allowed students, with no musical abilities, to competently work on acoustic engineering activities not related to music. Then, the professional title was changed to Acoustic Engineer. Thus, job opportunities were diversified and access was allowed by all types of students. In the last stage, the study plan was modified as a response to the new vision and requirements of the globalized world in which the environmental component has a great importance. In this work the development of a program that dates from 35 years ago is presented and justified.
NASA Technical Reports Server (NTRS)
1979-01-01
The home shown at right is specially designed to accommodate solar heating units; it has roof planes in four directions, allowing placement of solar collectors for best exposure to the sun. Plans (bottom) and complete working blueprints for the solar-heated house are being marketed by Home Building Plan Service, Portland, Oregon. The company also offers an inexpensive schematic (center) showing how a homeowner only moderately skilled in the use of tools can build his own solar energy system, applicable to new or existing structures. The schematic is based upon the design of a low-cost solar home heating system built and tested by NASA's Langley Research Center; used to supplement a warm-air heating system, it can save the homeowner about 40 percent of his annual heating bill for a modest investment in materials and components. Home Building Plan Service saved considerable research time by obtaining a NASA technical report which details the Langley work. The resulting schematic includes construction plans and simplified explanations of solar heat collection, collectors and other components, passive heat factors, domestic hot water supply and how to work with local heating engineers.
UAV Mission Optimization through Hybrid-Electric Propulsion
NASA Astrophysics Data System (ADS)
Blackwelder, Philip Scott
Hybrid-electric powertrain leverages the superior range of petrol based systems with the quiet and emission free benefits of electric propulsion. The major caveat to hybrid-electric powertrain in an airplane is that it is inherently heavier than conventional petroleum powertrain due mostly to the low energy density of battery technology. The first goal of this research is to develop mission planning code to match powertrain components for a small-scale unmanned aerial vehicle (UAV) to complete a standard surveillance mission within a set of user input parameters. The second goal is to promote low acoustic profile loitering through mid-flight engine starting. The two means by which midmission engine starting will be addressed is through reverse thrust from the propeller and a servo actuated gear to couple and decouple the engine and motor. The mission planning code calculates the power required to complete a mission and assists the user in sourcing powertrain components including the propeller, motor, battery, motor controller, engine and fuel. Reverse thrust engine starting involves characterizing an off the shelf variable pitch propeller and using its torque coefficient to calculate the advance ratio required to provide sufficient torque and speed to start an engine. Geared engine starting works like the starter in a conventional automobile. A servo actuated gear will couple the motor to the engine to start it and decouple once the engine has started. Reverse thrust engine starting was unsuccessful due to limitations of available off the shelf variable pitch propellers. However, reverse thrust engine starting could be realized through a custom larger diameter propeller. Geared engine starting was a success, though the system was unable to run fully as intended. Due to counter-clockwise crank rotation of the engine and the right-hand threads on the crankshaft, cranking the engine resulted in the nut securing the engine starter gear to back off as the engine cranked. A second nut was added to secure the starter gear but at the expense of removing the engine drive pulley. Removing the engine pulley meant that the starter gear must remain engaged to transmit torque to the propeller shaft as opposed to the engine pulley. This issue can be resolved using different hardware, however changing the mounting hardware would require additional modifications to the associated component which time would not permit. Though battery technology still proves to be the main constraint of electrified powertrain, careful design and mission planning can help minimize the weight penalties incurred. The mission planning code complements previous research by comparing the weight penalties of a blended climb versus an engine only climb and selecting the lightest option. Though reverse thrust engine starting proved unsuccessful, the success of geared engine starting now allows the engine to be shut off during loiter reducing both acoustic profile and fuel consumption during loiter.
30 CFR 77.1000 - Highwalls, pits and spoil banks; plans.
Code of Federal Regulations, 2012 CFR
2012-07-01
... Section 77.1000 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND... developed after June 30, 1971, which shall be consistent with prudent engineering design and will insure...
30 CFR 77.1000 - Highwalls, pits and spoil banks; plans.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Section 77.1000 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND... developed after June 30, 1971, which shall be consistent with prudent engineering design and will insure...
30 CFR 77.1000 - Highwalls, pits and spoil banks; plans.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Section 77.1000 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND... developed after June 30, 1971, which shall be consistent with prudent engineering design and will insure...
30 CFR 77.1000 - Highwalls, pits and spoil banks; plans.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Section 77.1000 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND... developed after June 30, 1971, which shall be consistent with prudent engineering design and will insure...
Teacher's Action Plan for "Shuttle External Tank and Solid Rocket Booster Math"
NASA Technical Reports Server (NTRS)
Prince, Mike
2007-01-01
My name is Mike Prince and I was one of eleven Brevard County teachers selected by United Space Alliance, LLC (USA), to work at the Kennedy Space Center (KSQ along side USA & NASA engineers during the Summer of 2007. Attached is a summary of my experience.
46 CFR 189.55-5 - Plans and specifications required for new construction.
Code of Federal Regulations, 2011 CFR
2011-10-01
...) OCEANOGRAPHIC RESEARCH VESSELS INSPECTION AND CERTIFICATION Plan Approval § 189.55-5 Plans and specifications..., carbon dioxide, foam and sprinkling systems. (e) Marine engineering. For plans required for marine engineering equipment and systems. See Subchapter F (Marine Engineering) of this chapter. (f) Electrical...
46 CFR 189.55-5 - Plans and specifications required for new construction.
Code of Federal Regulations, 2010 CFR
2010-10-01
...) OCEANOGRAPHIC RESEARCH VESSELS INSPECTION AND CERTIFICATION Plan Approval § 189.55-5 Plans and specifications..., carbon dioxide, foam and sprinkling systems. (e) Marine engineering. For plans required for marine engineering equipment and systems. See Subchapter F (Marine Engineering) of this chapter. (f) Electrical...
Balancing Plan-Driven and Agile Methods in Software Engineering Project Courses
NASA Astrophysics Data System (ADS)
Boehm, Barry; Port, Dan; Winsor Brown, A.
2002-09-01
For the past 6 years, we have been teaching a two-semester software engineering project course. The students organize into 5-person teams and develop largely web-based electronic services projects for real USC campus clients. We have been using and evolving a method called Model- Based (System) Architecting and Software Engineering (MBASE) for use in both the course and in industrial applications. The MBASE Guidelines include a lot of documents. We teach risk-driven documentation: if it is risky to document something, and not risky to leave it out (e.g., GUI screen placements), leave it out. Even so, students tend to associate more documentation with higher grades, although our grading eventually discourages this. We are always on the lookout for ways to have students learn best practices without having to produce excessive documentation. Thus, we were very interested in analyzing the various emerging agile methods. We found that agile methods and milestone plan-driven methods are part of a “how much planning is enough?” spectrum. Both agile and plan-driven methods have home grounds of project characteristics where they clearly work best, and where the other will have difficulties. Hybrid agile/plan-driven approaches are feasible, and necessary for projects having a mix of agile and plan-driven home ground characteristics. Information technology trends are going more toward the agile methods' home ground characteristics of emergent requirements and rapid change, although there is a concurrent increase in concern with dependability. As a result, we are currently experimenting with risk-driven combinations of MBASE and agile methods, such as integrating requirements, test plans, peer reviews, and pair programming into “agile quality management.”
The Cooperate Assistive Teamwork Environment for Software Description Languages.
Groenda, Henning; Seifermann, Stephan; Müller, Karin; Jaworek, Gerhard
2015-01-01
Versatile description languages such as the Unified Modeling Language (UML) are commonly used in software engineering across different application domains in theory and practice. They often use graphical notations and leverage visual memory for expressing complex relations. Those notations are hard to access for people with visual impairment and impede their smooth inclusion in an engineering team. Existing approaches provide textual notations but require manual synchronization between the notations. This paper presents requirements for an accessible and language-aware team work environment as well as our plan for the assistive implementation of Cooperate. An industrial software engineering team consisting of people with and without visual impairment will evaluate the implementation.
Methodological Considerations in the Design of Large Scale Systems Engineering Processes.
1981-02-01
phases as policy and proqram planning, project planning, system development , etc. 32 ro4- E V4-) C 0 (U JW 4-) L > U>) EWQ S -4-) (D4-) S - u 4-- , 4 U...orocedurally or substantively acceptable behavior, in either a descriptive or normative sense, in any specific circumstance. Prospect theory developed by...into a conceptual model of cognitive activity is contained in the works of Piaget ** , the founder of "genetic epistemology". According to Piaget
1989-07-01
and it was not possible to apply any existing planning techniques to this application. As a demonstrator the Route Planning Expert shows the powerful ...digital quantities, e.g. rotor speeds, engine torques, power rail states, switch settings, etc. It interacts with the pilot to obtain further...Befavior in Nuclear Power Plant Personnel. Nuclear Regulatory Commission, Report Ni. NUREG-CR-4532, 1987. (9) Abbott, K. Il~~tDaumininKweu.wtFut Dicynosig
Human Factors Evaluations of Two-Dimensional Spacecraft Conceptual Layouts
NASA Technical Reports Server (NTRS)
Kennedy, Kriss J.; Toups, Larry D.; Rudisill, Marianne
2010-01-01
Much of the human factors work done in support of the NASA Constellation lunar program has been with low fidelity mockups. These volumetric replicas of the future lunar spacecraft allow researchers to insert test subjects from the engineering and astronaut population and evaluate the vehicle design as the test subjects perform simulations of various operational tasks. However, lunar outpost designs must be evaluated without the use of mockups, creating a need for evaluation tools that can be performed on two-dimension conceptual spacecraft layouts, such as floor plans. A tool based on the Cooper- Harper scale was developed and applied to one lunar scenario, enabling engineers to select between two competing floor plan layouts. Keywords: Constellation, human factors, tools, processes, habitat, outpost, Net Habitable Volume, Cooper-Harper.
Composite Structures Materials Testing for the Orion Crew Vehicle Heat Shield
NASA Technical Reports Server (NTRS)
Khemani, Farah N.
2011-01-01
As research is being performed for the new heat shield for the Orion capsule, National Aeronautics and Space Administration (NASA) is developing the first composite heat shield. As an intern of the Structures Branch in the Engineering Directorate (ES 2), my main task was to set up a test plan to determine the material properties of the honeycomb that will be used on the Orion Crew Module heat shield to verify that the composite is suitable for the capsule. Before conducting composite shell tests, which are performed to simulate the crush performance of the heat shield on the capsule, it is necessary to determine the compression and shear properties of the composite used on the shell. During this internship, I was responsible for developing a test plan, designing parts for the test fixtures as well as getting them fabricated for the honeycomb shear and compression testing. This involved work in Pro/Engineer as well as coordinating with Fab Express, the Building 9 Composite Shop and the Structures Test Laboratory (STL). The research and work executed for this project will be used for composite sandwich panel testing in the future as well. As a part of the Structures Branch, my main focus was to research composite structures. This involves system engineering and integration (SE&I) integration, manufacturing, and preliminary testing. The procedures for these projects that were executed during this internship included design work, conducting tests and performing analysis.
Advanced Simulation and Computing Fiscal Year 2016 Implementation Plan, Version 0
DOE Office of Scientific and Technical Information (OSTI.GOV)
McCoy, M.; Archer, B.; Hendrickson, B.
2015-08-27
The Stockpile Stewardship Program (SSP) is an integrated technical program for maintaining the safety, surety, and reliability of the U.S. nuclear stockpile. The SSP uses nuclear test data, computational modeling and simulation, and experimental facilities to advance understanding of nuclear weapons. It includes stockpile surveillance, experimental research, development and engineering programs, and an appropriately scaled production capability to support stockpile requirements. This integrated national program requires the continued use of experimental facilities and programs, and the computational capabilities to support these programs. The purpose of this IP is to outline key work requirements to be performed and to control individualmore » work activities within the scope of work. Contractors may not deviate from this plan without a revised WA or subsequent IP.« less
ISTAR: Project Status and Ground Test Engine Design
NASA Technical Reports Server (NTRS)
Quinn, Jason Eugene
2003-01-01
Review of the current technical and programmatic status of the Integrated System Test of an Airbreathing Rocket (ISTAR) project. November 2002 completed Phase 1 of this project: which worked the conceptual design of the X-43B demonstrator vehicle and Flight Test Engine (FTE) order to develop realistic requirements for the Ground Test Engine (GTE). The latest conceptual FTE and X-43B configuration is briefly reviewed. The project plan is to reduce risk to the GTE and FTE concepts through several tests: thruster, fuel endothermic characterization, engine structure/heat exchanger, injection characterization rig, and full scale direct connect combustion rig. Each of these will be discussed along with the project schedule. This discussion is limited due to ITAR restrictions on open literature papers.
NASA Technical Reports Server (NTRS)
Bordelon, Wayne J., Jr.; Ballard, Rick O.; Gerrish, Harold P., Jr.
2006-01-01
With the announcement of the Vision for Space Exploration on January 14, 2004, there has been a renewed interest in nuclear thermal propulsion. Nuclear thermal propulsion is a leading candidate for in-space propulsion for human Mars missions; however, the cost to develop a nuclear thermal rocket engine system is uncertain. Key to determining the engine development cost will be the engine requirements, the technology used in the development and the development approach. The engine requirements and technology selection have not been defined and are awaiting definition of the Mars architecture and vehicle definitions. The paper discusses an engine development approach in light of top-level strategic questions and considerations for nuclear thermal propulsion and provides a suggested approach based on work conducted at the NASA Marshall Space Flight Center to support planning and requirements for the Prometheus Power and Propulsion Office. This work is intended to help support the development of a comprehensive strategy for nuclear thermal propulsion, to help reduce the uncertainty in the development cost estimate, and to help assess the potential value of and need for nuclear thermal propulsion for a human Mars mission.
NASA Astrophysics Data System (ADS)
Salmi, Hannu; Thuneberg, Helena; Vainikainen, Mari-Pauliina
2016-11-01
Outreach activities, like mobile science exhibitions, give opportunities to hands-on experiences in an attractive learning environment. We analysed attitudes, motivation and learning during a science exhibition visit, their relations to gender and future educational plans in Finland, Estonia, Latvia and Belgium (N = 1210 sixth-graders). Pupils' performance in a knowledge test improved after the visit. Autonomous motivation and attitudes towards science predicted situation motivation awakened in the science exhibition. Interestingly, the scientist attitude and the societal attitude were clearly separate dimensions. The third dimension was manifested in the engineering attitude typical for boys, who were keener on working with appliances, designing computer games and animations. Scientist and societal attitudes correlated positively and engineering attitude correlated negatively with the future educational plans of choosing the academic track in secondary education. The societal perspective on science was connected to above average achievement. In the follow-up test, these attitudes showed to be quite stable.
NASA Astrophysics Data System (ADS)
Conchado Peiró, Andrea; Bas Cerdá, María del Carmen; Gharaibeh, Khaled M.; Kaylani, Hazem
2017-09-01
The objective of this study is to identify the competencies required to achieve success in the transition from higher education to the labour market based on the perceptions of employers. This paper analyses the assessments made by a group of engineering company employers. An item-battery of 20 competencies was grouped into 3 dimensions by using factor analysis. Subsequently, respondents' scores were also clustered into three groups and characterised through contingency tables. The competencies demanded by employers were grouped into business and finance, problem-solving and strategic planning. Significant differences were found between responses from employers working in medium and small companies, who placed more importance on competencies related to problem-solving and strategic planning, and employers in big companies, who were more concerned about the difficulties of finding well-trained graduates. The findings from this paper have important implications for research in the areas of higher education and organisations that usually employ graduate engineers.
Defining Medical Capabilities for Exploration Missions
NASA Technical Reports Server (NTRS)
Hailey, M.; Antonsen, E.; Blue, R.; Reyes, D.; Mulcahy, R.; Kerstman, E.; Bayuse, T.
2018-01-01
Exploration-class missions to the moon, Mars and beyond will require a significant change in medical capability from today's low earth orbit centric paradigm. Significant increases in autonomy will be required due to differences in duration, distance and orbital mechanics. Aerospace medicine and systems engineering teams are working together within ExMC to meet these challenges. Identifying exploration medical system needs requires accounting for planned and unplanned medical care as defined in the concept of operations. In 2017, the ExMC Clinicians group identified medical capabilities to feed into the Systems Engineering process, including: determining what and how to address planned and preventive medical care; defining an Accepted Medical Condition List (AMCL) of conditions that may occur and a subset of those that can be treated effectively within the exploration environment; and listing the medical capabilities needed to treat those conditions in the AMCL. This presentation will discuss the team's approach to addressing these issues, as well as how the outputs of the clinical process impact the systems engineering effort.
Some guidance on preparing validation plans for the DART Full System Models.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gray, Genetha Anne; Hough, Patricia Diane; Hills, Richard Guy
2009-03-01
Planning is an important part of computational model verification and validation (V&V) and the requisite planning document is vital for effectively executing the plan. The document provides a means of communicating intent to the typically large group of people, from program management to analysts to test engineers, who must work together to complete the validation activities. This report provides guidelines for writing a validation plan. It describes the components of such a plan and includes important references and resources. While the initial target audience is the DART Full System Model teams in the nuclear weapons program, the guidelines are generallymore » applicable to other modeling efforts. Our goal in writing this document is to provide a framework for consistency in validation plans across weapon systems, different types of models, and different scenarios. Specific details contained in any given validation plan will vary according to application requirements and available resources.« less
The 1990 progress report and future plans
NASA Technical Reports Server (NTRS)
Friedland, Peter; Zweben, Monte; Compton, Michael
1990-01-01
This document describes the progress and plans of the Artificial Intelligence Research Branch (RIA) at ARC in 1990. Activities span a range from basic scientific research to engineering development and to fielded NASA applications, particularly those applications that are enabled by basic research carried out at RIA. Work is conducted in-house and through collaborative partners in academia and industry. Our major focus is on a limited number of research themes with a dual commitment to technical excellence and proven applicability to NASA short, medium, and long-term problems. RIA acts as the Agency's lead organization for research aspects of artificial intelligence, working closely with a second research laboratory at JPL and AI applications groups at all NASA centers.
ENGINEERED BARRIER SYSTEM: PHYSICAL AND CHEMICAL ENVIRONMENT
DOE Office of Scientific and Technical Information (OSTI.GOV)
R. Jarek
2005-08-29
The purpose of this model report is to describe the evolution of the physical and chemical environmental conditions within the waste emplacement drifts of the repository, including the drip shield and waste package surfaces. The resulting seepage evaporation and gas abstraction models are used in the total system performance assessment for the license application (TSPA-LA) to assess the performance of the engineered barrier system and the waste form. This report develops and documents a set of abstraction-level models that describe the engineered barrier system physical and chemical environment. Where possible, these models use information directly from other reports as input,more » which promotes integration among process models used for TSPA-LA. Specific tasks and activities of modeling the physical and chemical environment are included in ''Technical Work Plan for: Near-Field Environment and Transport In-Drift Geochemistry Model Report Integration'' (BSC 2005 [DIRS 173782], Section 1.2.2). As described in the technical work plan, the development of this report is coordinated with the development of other engineered barrier system reports. To be consistent with other project documents that address features, events, and processes (FEPs), Table 6.14.1 of the current report includes updates to FEP numbers and FEP subjects for two FEPs identified in the technical work plan (TWP) governing this report (BSC 2005 [DIRS 173782]). FEP 2.1.09.06.0A (Reduction-oxidation potential in EBS), as listed in Table 2 of the TWP (BSC 2005 [DIRS 173782]), has been updated in the current report to FEP 2.1.09.06.0B (Reduction-oxidation potential in Drifts; see Table 6.14-1). FEP 2.1.09.07.0A (Reaction kinetics in EBS), as listed in Table 2 of the TWP (BSC 2005 [DIRS 173782]), has been updated in the current report to FEP 2.1.09.07.0B (Reaction kinetics in Drifts; see Table 6.14-1). These deviations from the TWP are justified because they improve integration with FEPs documents. The updates have no impact on the model developed in this report.« less
Human Factors Engineering. A Self-Paced Text, Lessons 36-40,
1981-08-01
proposed contract does not involve ’significant human interface for operation/ maintenance /control,’ the selection guide should not be used. Turn to Page 98... work space configuration, packaging, and labeling. These are all aspects of maintenance which need to be incorporated into the original design plans... work done. An ROC is a ’Required Operational Capability’ statement that is required by the Army during the system acquisition process . Return to Page
The Office of General Counsel (OGC) has an ongoing business process engineering and business process automation initiative which has helped the office reduce administrative labor costs while increasing employee effectiveness. Supporting this effort is a system of automated routines accessible through a portal' interface called OGC Dashboard. The dashboard helps OGC track work progress, legal case load, written work products such as legal briefs and advice, and scheduling processes such as employee leave plans (via calendar) and travel compensatory time off.
14 CFR 151.111 - Advance planning proposals: General.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Engineering Proposals § 151.111 Advance planning proposals: General. (a) Each advance planning and engineering... application, under §§ 151.21(c) and 151.27, or both. (c) Each proposal must relate to planning and engineering... “Airport Activity Statistics of Certificated Route Air Carriers” (published jointly by FAA and the Civil...
NASA Technical Reports Server (NTRS)
Oliver, Michael
2014-01-01
This presentation will be made at the 92nd AIAA Turbine Engine Testing Working Group (TETWoG), a semi-annual technical meeting of turbine engine testing professionals. The objective is to describe an effort by NASA to measure the water vapor content on the core airflow in a full scale turbine engine ice crystal icing test and to open a discussion with colleagues how to accurately conduct the measurement based on any previous collective experience with the procedure, instruments and nature of engine icing testing within the group. The presentation lays out the schematics of the location in the flow path from which the sample will be drawn, the plumbing to get it from the engine flow path to the sensor and several different water vapor measurement technologies that will be used: Tunable diode laser and infrared spectroscopy.
Virtual manufacturing work cell for engineering
NASA Astrophysics Data System (ADS)
Watanabe, Hideo; Ohashi, Kazushi; Takahashi, Nobuyuki; Kato, Kiyotaka; Fujita, Satoru
1997-12-01
The life cycles of products have been getting shorter. To meet this rapid turnover, manufacturing systems must be frequently changed as well. In engineering to develop manufacturing systems, there are several tasks such as process planning, layout design, programming, and final testing using actual machines. This development of manufacturing systems takes a long time and is expensive. To aid the above engineering process, we have developed the virtual manufacturing workcell (VMW). This paper describes a concept of VMW and design method through computer aided manufacturing engineering using VMW (CAME-VMW) related to the above engineering tasks. The VMW has all design data, and realizes a behavior of equipment and devices using a simulator. The simulator has logical and physical functionality. The one simulates a sequence control and the other simulates motion control, shape movement in 3D space. The simulator can execute the same control software made for actual machines. Therefore we can verify the behavior precisely before the manufacturing workcell will be constructed. The VMW creates engineering work space for several engineers and offers debugging tools such as virtual equipment and virtual controllers. We applied this VMW to development of a transfer workcell for vaporization machine in actual manufacturing system to produce plasma display panel (PDP) workcell and confirmed its effectiveness.
ECUT: Energy Conversion and Utilization Technologies program - Biocatalysis research activity
NASA Technical Reports Server (NTRS)
Wilcox, R.
1984-01-01
The activities of the Biocatalysis Research Activity are organized into the Biocatalysis and Molecular Modeling work elements and a supporting planning and analysis function. In the Biocatalysis work element, progress is made in developing a method for stabilizing genetically engineered traits in microorganisms, refining a technique for monitoring cells that are genetically engineered, and identifying strains of fungi for highly efficient preprocessing of biomass for optimizing the efficiency of bioreactors. In the Molecular Modeling work element, a preliminary model of the behavior of enzymes is developed. A preliminary investigation of the potential for synthesizing enzymes for use in electrochemical processes is completed. Contact with industry and universities is made to define key biocatalysis technical issues and to broaden the range of potential participants in the activity. Analyses are conducted to identify and evaluate potential concepts for future research funding.
Comparison of free-piston Stirling engine model predictions with RE1000 engine test data
NASA Technical Reports Server (NTRS)
Tew, R. C., Jr.
1984-01-01
Predictions of a free-piston Stirling engine model are compared with RE1000 engine test data taken at NASA-Lewis Research Center. The model validation and the engine testing are being done under a joint interagency agreement between the Department of Energy's Oak Ridge National Laboratory and NASA-Lewis. A kinematic code developed at Lewis was upgraded to permit simulation of free-piston engine performance; it was further upgraded and modified at Lewis and is currently being validated. The model predicts engine performance by numerical integration of equations for each control volume in the working space. Piston motions are determined by numerical integration of the force balance on each piston or can be specified as Fourier series. In addition, the model Fourier analyzes the various piston forces to permit the construction of phasor force diagrams. The paper compares predicted and experimental values of power and efficiency and shows phasor force diagrams for the RE1000 engine displacer and piston. Further development plans for the model are also discussed.
Wave-Rotor-Enhanced Gas Turbine Engine Demonstrator
NASA Technical Reports Server (NTRS)
Welch, Gerard E.; Paxson, Daniel E.; Wilson, Jack; Synder, Philip H.
1999-01-01
The U.S. Army Research Laboratory, NASA Glenn Research Center, and Rolls-Royce Allison are working collaboratively to demonstrate the benefits and viability of a wave-rotor-topped gas turbine engine. The self-cooled wave rotor is predicted to increase the engine overall pressure ratio and peak temperature by 300% and 25 to 30%. respectively, providing substantial improvements in engine efficiency and specific power. Such performance improvements would significantly reduce engine emissions and the fuel logistics trails of armed forces. Progress towards a planned demonstration of a wave-rotor-topped Rolls-Royce Allison model 250 engine has included completion of the preliminary design and layout of the engine, the aerodynamic design of the wave rotor component and prediction of its aerodynamic performance characteristics in on- and off-design operation and during transients, and the aerodynamic design of transition ducts between the wave rotor and the high pressure turbine. The topping cycle increases the burner entry temperature and poses a design challenge to be met in the development of the demonstrator engine.
ERIC Educational Resources Information Center
Darwish, Naif A.; Qasim, Muhammad
2016-01-01
In academia, smooth progression of students significantly depends on the way curricula are developed and organized. Curricula or study plans with high degree of interconnectivity between courses, multiple prerequisites, and hierarchically structured courses tend to complicate the smooth progress of the enrolled students. In this work, a rigorous…
Engineering Encounters: The Tightrope Challenge
ERIC Educational Resources Information Center
Burton, Bill
2014-01-01
In order to prepare students to become the next innovators, teachers need to provide real-world challenges that allow children to exercise their innovation muscles. Innovation starts with a problem and innovators work to solve a problem by planning, creating, and testing. The real-world innovation process does not happen on a worksheet, and it…
A GRE Test for the STEM Disciplines: Developing an Assessment "of" and "for" Learning
ERIC Educational Resources Information Center
Payne, David G.; Briel, Jacqueline B.; Hawthorn, John; Riedeburg, Karen
2006-01-01
Plans are described for creating a Graduate Record Examination (GRE) test for the STEM (science, technology, engineering, and mathematics) disciplines. Previous work showed that a quantitative measure for the STEM disciplines exacerbated group differences beyond those reflected in the current GRE General Test. A test development approach is…
The Test and Evaluation of Non-Chromate Finishing Agent
NASA Technical Reports Server (NTRS)
Okhio, Cyril; Gulley, Harold; Steele, Gynelle (Technical Monitor)
2002-01-01
Clark Atlanta University (CAU) has engaged a team comprised of university faculty members, student research assistants, and consultants from industrial and technology firms in order to ensure that NASA receives a quality product on time and within budget. In addition to the current related expertise which CAU possess, we have enlisted materials and aid from several other agencies, and machine manufacturers to assist us in completing the project on time and according to plan and budget. The research team is employing sound engineering principles in its approach to this project. Each phase of the project is preceded by a thorough and complete planning session that details the work plan and provide a comprehensive review of the work to be accomplished during the particular phase and by whom. Maximum use is being made of existing or already planned capabilities to ensure maximum economy, and frequent online reviews are being held to measure progress and to identify a potential problem in sufficient time to allow for corrective action.
Engineering Technical Review Planning Briefing
NASA Technical Reports Server (NTRS)
Gardner, Terrie
2012-01-01
The general topics covered in the engineering technical planning briefing are 1) overviews of NASA, Marshall Space Flight Center (MSFC), and Engineering, 2) the NASA Systems Engineering(SE) Engine and its implementation , 3) the NASA Project Life Cycle, 4) MSFC Technical Management Branch Services in relation to the SE Engine and the Project Life Cycle , 5) Technical Reviews, 6) NASA Human Factor Design Guidance , and 7) the MSFC Human Factors Team. The engineering technical review portion of the presentation is the primary focus of the overall presentation and will address the definition of a design review, execution guidance, the essential stages of a technical review, and the overall review planning life cycle. Examples of a technical review plan content, review approaches, review schedules, and the review process will be provided and discussed. The human factors portion of the presentation will focus on the NASA guidance for human factors. Human factors definition, categories, design guidance, and human factor specialist roles will be addressed. In addition, the NASA Systems Engineering Engine description, definition, and application will be reviewed as background leading into the NASA Project Life Cycle Overview and technical review planning discussion.
Operation of the Institute for Computer Applications in Science and Engineering
NASA Technical Reports Server (NTRS)
1975-01-01
The ICASE research program is described in detail; it consists of four major categories: (1) efficient use of vector and parallel computers, with particular emphasis on the CDC STAR-100; (2) numerical analysis, with particular emphasis on the development and analysis of basic numerical algorithms; (3) analysis and planning of large-scale software systems; and (4) computational research in engineering and the natural sciences, with particular emphasis on fluid dynamics. The work in each of these areas is described in detail; other activities are discussed, a prognosis of future activities are included.
2nd Generation Reusable Launch Vehicle (2G RLV). Revised
NASA Technical Reports Server (NTRS)
Matlock, Steve; Sides, Steve; Kmiec, Tom; Arbogast, Tim; Mayers, Tom; Doehnert, Bill
2001-01-01
This is a revised final report and addresses all of the work performed on this program. Specifically, it covers vehicle architecture background, definition of six baseline engine cycles, reliability baseline (space shuttle main engine QRAS), and component level reliability/performance/cost for the six baseline cycles, and selection of 3 cycles for further study. This report further addresses technology improvement selection and component level reliability/performance/cost for the three cycles selected for further study, as well as risk reduction plans, and recommendation for future studies.
NASA Astrophysics Data System (ADS)
Maulana, I.; Sumarto; Nurafiati, P.; Puspita, R. H.
2018-02-01
This research aims to find out the evaluation program of the Industrial apprenticeship (Prakerin) in electrical engineering. This research includes on four variables of CIPP. (1). Context (a). programme planning (b). design. (2). Input (a). readiness of students (b). performance of vocational education teachers (c). Facilities and infrastructure, (3). process (a). performance students (b). performance mentors, (4). Product (a). readiness of student work. This research is a type of program evaluation research with Stake model approach. Data collection methods used are questionnaires with closed questions and frequently asked questions.
Selenide isotope generator for the Galileo mission. Reliability program plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1978-10-01
The reliability program plan for the Selenide Isotope Generator (SIG) program is presented. It delineates the specific tasks that will be accomplished by Teledyne Energy Systems and its suppliers during design, development, fabrication and test of deliverable Radioisotopic Thermoelectric Generators (RTG), Electrical Heated Thermoelectric Generators (ETG) and associated Ground Support Equipment (GSE). The Plan is formulated in general accordance with procedures specified in DOE Reliability Engineering Program Requirements Publication No. SNS-2, dated June 17, 1974. The Reliability Program Plan presented herein defines the total reliability effort without further reference to Government Specifications. The reliability tasks to be accomplished are delineatedmore » herein and become the basis for contract compliance to the extent specified in the SIG contract Statement of Work.« less
SOFIA Program SE and I Lessons Learned
NASA Technical Reports Server (NTRS)
Ray, Ronald J.; Fobel, Laura J.; Brignola, Michael P.
2011-01-01
Once a "Troubled Project" threatened with cancellation, the Stratospheric Observatory for Infrared Astronomy (SOFIA) Program has overcome many difficult challenges and recently achieved its first light images. To achieve success, SOFIA had to overcome significant deficiencies in fundamental Systems Engineering identified during a major Program restructuring. This presentation will summarize the lessons learn in Systems Engineering on the SOFIA Program. After the Program was reformulated, an initial assessment of Systems Engineering established the scope of the problem and helped to set a list of priorities that needed to be work. A revised Systems Engineering Management Plan (SEMP) was written to address the new Program structure and requirements established in the approved NPR7123.1A. An important result of the "Technical Planning" effort was the decision by the Program and Technical Leadership team to re-phasing the lifecycle into increments. The reformed SOFIA Program Office had to quickly develop and establish several new System Engineering core processes including; Requirements Management, Risk Management, Configuration Management and Data Management. Implementing these processes had to consider the physical and cultural diversity of the SOFIA Program team which includes two Projects spanning two NASA Centers, a major German partnership, and sub-contractors located across the United States and Europe. The SOFIA Program experience represents a creative approach to doing "System Engineering in the middle" while a Program is well established. Many challenges were identified and overcome. The SOFIA example demonstrates it is never too late to benefit from fixing deficiencies in the System Engineering processes.
NASA Astrophysics Data System (ADS)
Johan, Kartina; Mohd Turan, Faiz
2016-11-01
‘Environmental and sustainability’ is one of the Program Outcome (PO) designated by the Board of Engineers Malaysia (BEM) as one of the accreditation program requirement. However, to-date the implementation of sustainability elements in engineering programme in the technical universities in Malaysia is within individual faculty's curriculum plan and lack of university-level structured learning pathway, which enable all students to have access to an education in sustainability across all disciplines. Sustainability Graduate Community (SGC) is a framework designed to provide a learning pathway in the curriculum of engineering programs to inculcate sustainability education among engineering graduates. This paper aims to study the required attributes in Sustainability Graduate Community (SGC) framework to produce graduates who are not just engineers but also skilful in sustainability competencies using Global Project Management (GPM) P5 Standard for Sustainability. The development of the conceptual framework is to provide a constructive teaching and learning plan for educators and policy makers to work on together in developing the Sustainability Graduates (SG), the new kind of graduates from Malaysia Technical Universities Network (MTUN) in Malaysia who are literate in sustainability practices. The framework also support the call for developing holistic students based on Malaysian Education Blueprint (Higher Education) and address the gap between the statuses of engineering qualification to the expected competencies from industries in Malaysia in particular by achieving the SG attributes outlined in the framework
Coal gasification systems engineering and analysis. Volume 1: Executive summary
NASA Technical Reports Server (NTRS)
1980-01-01
Feasibility analyses and systems engineering studies for a 20,000 tons per day medium Btu (MBG) coal gasification plant to be built by TVA in Northern Alabama were conducted. Major objectives were as follows: (1) provide design and cost data to support the selection of a gasifier technology and other major plant design parameters, (2) provide design and cost data to support alternate product evaluation, (3) prepare a technology development plan to address areas of high technical risk, and (4) develop schedules, PERT charts, and a work breakdown structure to aid in preliminary project planning. Volume one contains a summary of gasification system characterizations. Five gasification technologies were selected for evaluation: Koppers-Totzek, Texaco, Lurgi Dry Ash, Slagging Lurgi, and Babcock and Wilcox. A summary of the trade studies and cost sensitivity analysis is included.
Experiences with Extra-Vehicular Activities in Response to Critical ISS Contingencies
NASA Technical Reports Server (NTRS)
Van Cise, Edward A.; Kelly, Brian J.; Radigan, Jeffery P.; Cranmer, Curtis W.
2016-01-01
Initial "Big 14" work was put to the test for the first time in 2010. Deficiencies were found in some of the planning and approaches to that work; Failure Response Assessment Team created in 2010 to address deficiencies -Identify and perform engineering analysis in operations products prior to failure; incorporate results into operations products -Identify actions for protecting ISS against a Next Worse Failure after the first failure occurs -Better document not only EVA products but also planning products, assumptions, and open actions; Pre-failure investments against critical failures best postures ISS for swift response and recovery -A type of insurance policy -Has proven effective in a number of contingency EVA cases since 2010. Planning for MBSU R&R in 2012, Second PM R&R in 2013, EXT MDM R&R in 2014; Current FRAT schedule projects completion of all analysis in 2018
NASA Technical Reports Server (NTRS)
Mcbride, John G.
1990-01-01
The mission of the AdaNET research effort is to determine how to increase the availability of reusable Ada components and associated software engineering technology to both private and Federal sectors. The effort is structured to define the requirements for transfer of Federally developed software technology, study feasible approaches to meeting the requirements, and to gain experience in applying various technologies and practices. The overall approach to the development of the AdaNET System Specification is presented. A work breakdown structure is presented with each research activity described in detail. The deliverables for each work area are summarized. The overall organization and responsibilities for each research area are described. The schedule and necessary resources are presented for each research activity. The estimated cost is summarized for each activity. The project plan is fully described in the Super Project Expert data file contained on the floppy disk attached to the back cover of this plan.
Installation of Groundwater Monitoring Wells TAV-MW15 and TAV-MW16.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lum, Clinton C. L.
This report documents the installation of two groundwater monitoring wells at the Technical Area V Groundwater (TAVG) Area of Concern at Sandia National Laboratories, New Mexico (SNL/NM). SNL/NM is managed and operated by National Technology and Engineering Solutions of Sandia, LLC., a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration under contract DE-NA- 0003525. Well installation activities were conducted in accordance with the New Mexico Environment Department (NMED) Hazardous Waste Bureau (HWB)-approved work plan Revised Treatability Study Work Plan for In-Situ Bioremediation at the Technical Area-V Groundwater Area of Concern (Workmore » Plan) (SNL/NM March 2016). The Work Plan was approved by NMED HWB prior to the start of field work (NMED May 2016). Project activities were performed from November 2016 through January 2017 by SNL/NM Environmental Restoration (ER) Operations personnel, and the SNL/NM drilling contractor Cascade Drilling LP. Drilling activities began with borehole drilling and sampling on November 30, 2016. Well construction and development fieldwork was completed on January 31, 2017. Land surveys to establish the location coordinates and elevations of the two wells were completed on March 23, 2017, and transmitted to SNL/NM personnel on April 17, 2017.« less
Scientific and technical training in the Soviet Union
NASA Technical Reports Server (NTRS)
Spearman, M. L.
1983-01-01
Specific features and observations on the Soviet educational system and areas of apparent effectiveness are presented, noting that the literacy rate is over 98 percent in 1982. Educational goals are reoriented every five years to match with other projections of five-year plans. The Soviet constitution established strong educational goals, including schools, correspondence courses, lectures in native tongues, free tuition, and vocational training. The educational pattern from pre-school through graduate school lasts over 28 yr and contains two 2-yr periods of work, confined to specialties after graduate school. Mathematics is emphasized, as are physics, Marxism, and a foreign language. Approximately 300,000 engineers were graduated in the Soviet Union in 1982, compared with the 20-yr U.S. average of 50,000/yr. About 2/3 of Soviet engineers participate in defense work, a number which is four times the total number of U.S. engineers. It is asserted that the continual indoctrination, organization, and practical work experience will guarantee that the Soviet state will remain a dominant force in the world as long as centralized state control can be carried out.
Towards automatic planning for manufacturing generative processes
DOE Office of Scientific and Technical Information (OSTI.GOV)
CALTON,TERRI L.
2000-05-24
Generative process planning describes methods process engineers use to modify manufacturing/process plans after designs are complete. A completed design may be the result from the introduction of a new product based on an old design, an assembly upgrade, or modified product designs used for a family of similar products. An engineer designs an assembly and then creates plans capturing manufacturing processes, including assembly sequences, component joining methods, part costs, labor costs, etc. When new products originate as a result of an upgrade, component geometry may change, and/or additional components and subassemblies may be added to or are omitted from themore » original design. As a result process engineers are forced to create new plans. This is further complicated by the fact that the process engineer is forced to manually generate these plans for each product upgrade. To generate new assembly plans for product upgrades, engineers must manually re-specify the manufacturing plan selection criteria and re-run the planners. To remedy this problem, special-purpose assembly planning algorithms have been developed to automatically recognize design modifications and automatically apply previously defined manufacturing plan selection criteria and constraints.« less
Coordinating robot motion, sensing, and control in plans. LDRD project final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Xavier, P.G.; Brown, R.G.; Watterberg, P.A.
1997-08-01
The goal of this project was to develop a framework for robotic planning and execution that provides a continuum of adaptability with respect to model incompleteness, model error, and sensing error. For example, dividing robot motion into gross-motion planning, fine-motion planning, and sensor-augmented control had yielded productive research and solutions to individual problems. Unfortunately, these techniques could only be combined by hand with ad hoc methods and were restricted to systems where all kinematics are completely modeled in planning. The original intent was to develop methods for understanding and autonomously synthesizing plans that coordinate motion, sensing, and control. The projectmore » considered this problem from several perspectives. Results included (1) theoretical methods to combine and extend gross-motion and fine-motion planning; (2) preliminary work in flexible-object manipulation and an implementable algorithm for planning shortest paths through obstacles for the free-end of an anchored cable; (3) development and implementation of a fast swept-body distance algorithm; and (4) integration of Sandia`s C-Space Toolkit geometry engine and SANDROS motion planer and improvements, which yielded a system practical for everyday motion planning, with path-segment planning at interactive speeds. Results (3) and (4) have either led to follow-on work or are being used in current projects, and they believe that (2) will eventually be also.« less
Department of the Air Force. FY 1995 Budget Estimates. Military Construction and Family Housing
1994-02-01
monorail lift systems and provide AFFF fire protection system, and elevators. Renovate engineering and work areas; provide new air make-up unit and...135,0U0 SY 1,200 880-212 AFFF FIRE SUPPRESSION SYSTEM LS 800 FOR FUEL CELL TOTAL: 10,450 9b. Future Projects: Typical Planned Next Three Years: 111...PROTECT 2 EA 3,600 PH II & AFFF PUMPS/RESERVOIR TOTAL: 27,900 9b. Future Projects: Typical Planned Next Three Years: 442-758 WAREHOUSE 107,000 SF
NASA Goddard Space Flight Center
NASA Technical Reports Server (NTRS)
Carter, David; Wetzel, Scott
2000-01-01
The NASA SLR Operational Center is responsible for: 1) NASA SLR network control, sustaining engineering, and logistics; 2) ILRS mission operations; and 3) ILRS and NASA SLR data operations. NASA SLR network control and sustaining engineering tasks include technical support, daily system performance monitoring, system scheduling, operator training, station status reporting, system relocation, logistics and support of the ILRS Networks and Engineering Working Group. These activities ensure the NASA SLR systems are meeting ILRS and NASA mission support requirements. ILRS mission operations tasks include mission planning, mission analysis, mission coordination, development of mission support plans, and support of the ILRS Missions Working Group. These activities ensure than new mission and campaign requirements are coordinated with the ILRS. Global Normal Points (NP) data, NASA SLR FullRate (FR) data, and satellite predictions are managed as part of data operations. Part of this operation includes supporting the ILRS Data Formats and Procedures Working Group. Global NP data operations consist of receipt, format and data integrity verification, archiving and merging. This activity culminates in the daily electronic transmission of NP files to the CDDIS. Currently of all these functions are automated. However, to ensure the timely and accurate flow of data, regular monitoring and maintenance of the operational software systems, computer systems and computer networking are performed. Tracking statistics between the stations and the data centers are compared periodically to eliminate lost data. Future activities in this area include sub-daily (i.e., hourly) NP data management, more stringent data integrity tests, and automatic station notification of format and data integrity issues.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bush, T.S.
1995-03-01
In December 1992, the Department of Energy (DOE) implemented the DOE Radiological Control Manual (RCM). Westinghouse Idaho Nuclear Company, Inc. (WINCO) submitted an implementation plan showing how compliance with the manual would be achieved. This implementation plan was approved by DOE in November 1992. Although WINCO had already been working under a similar Westinghouse RCM, the DOE RCM brought some new and challenging requirements. One such requirement was that of having procedure writers and job planners create the radiological input in work control procedures. Until this time, that information was being provided by radiological engineering or a radiation safety representative.more » As a result of this requirement, Westinghouse developed the Radiological Evaluation Decision Input (REDI) program.« less
Manufacturing Methods and Technology Program Plan. Update.
1981-11-01
INDUSTRIAL BASE ENGINEERING ACTIVITY ROCK ISLAND. ILLINOIS 61299 82 INDEX PAGE I. INTRODUCTION The MMT Program Plan Update ........... 1 Industry Guide...obtained from that Plan, extra copies of which are available upon request from the Industrial Base Engineering Activity. Other sources for this data are...Major Subcommands (SUBMACOM’S). The SUBMACOM’S plan, formulate, budget, and execute individual projects. The Industrial Base Engineering Activity
An overview of NASA intermittent combustion engine research
NASA Technical Reports Server (NTRS)
Willis, E. A.; Wintucky, W. T.
1984-01-01
This paper overviews the current program, whose objective is to establish the generic technology base for advanced aircraft I.C. engines of the early 1990's and beyond. The major emphasis of this paper is on development of the past two years. Past studies and ongoing confirmatory experimental efforts are reviewed, which show unexpectedly high potential when modern aerospace technologies are applied to inherently compact and balanced I.C. engine configurations. Currently, the program is focussed on two engine concepts, the stratified-charge, multi-fuel rotary and the lightweight two-stroke diesel. A review is given of contracted and planned high performance one-rotor and one-cylinder test engine work addressing several levels of technology. Also reviewed are basic supporting efforts, e.g., the development and experimental validation of computerized airflow and combustion process models, being performed in-house at Lewis Research Center and by university grants. Previously announced in STAR as N84-24583
Real-time Simulation of Turboprop Engine Control System
NASA Astrophysics Data System (ADS)
Sheng, Hanlin; Zhang, Tianhong; Zhang, Yi
2017-05-01
On account of the complexity of turboprop engine control system, real-time simulation is the technology, under the prerequisite of maintaining real-time, to effectively reduce development cost, shorten development cycle and avert testing risks. The paper takes RT-LAB as a platform and studies the real-time digital simulation of turboprop engine control system. The architecture, work principles and external interfaces of RT-LAB real-time simulation platform are introduced firstly. Then based on a turboprop engine model, the control laws of propeller control loop and fuel control loop are studied. From that and on the basis of Matlab/Simulink, an integrated controller is designed which can realize the entire process control of the engine from start-up to maximum power till stop. At the end, on the basis of RT-LAB platform, the real-time digital simulation of the designed control system is studied, different regulating plans are tried and more ideal control effects have been obtained.
An overview of NASA intermittent combustion engine research
NASA Technical Reports Server (NTRS)
Willis, E. A.; Wintucky, W. T.
1984-01-01
This paper overviews the current program, whose objective is to establish the generic technology base for advanced aircraft I.C. engines of the early 1990's and beyond. The major emphasis of this paper is on development of the past two years. Past studies and ongoing confirmatory experimental efforts are reviewed, which show unexpectly high potential when modern aerospace technologies are applied to inherently compact and balanced I.C. engine configurations. Currently, the program is focussed on two engine concepts the stratified-charge, multi-fuel rotary, and the lightweight two-stroke diesel. A review is given of contracted and planned high performance one-rotor and one-cylinder test engine work addressing several levels of technology. Also reviewed are basic supporting efforts, e.g., the development and experimental validation of computerized airflow and combustion process models, being performed in-house at Lewis Research Center and by university grants.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-03
... the availability on its Web site of the applicant information, submission deadlines, funding criteria... funding for architectural and engineering work, site control, and other planning related expenses that are... using the Department of Housing and Urban Development agency link on the Grants.gov/Find Web site at...
ERIC Educational Resources Information Center
Okudan, Gul E.; Mohammed, Susan; Ogot, Madara
2006-01-01
This paper presents the preliminary work for developing guidelines to ensure that industry-sponsored projects in first-year courses aid, not hamper, retention of students. Specifically, the overall research plan includes the following steps: (1) investigating the appropriateness of industry projects in a required introduction to engineering design…
NASA Astrophysics Data System (ADS)
1980-07-01
Accomplishments are reported in the areas of: program management, system integration, the beam characterization system, receiver unit, thermal storage subsystems, master control system, plant support subsystem and engineering services. A solar facilities design integration program action items update is included. Work plan changes and cost underruns are discussed briefly. (LEW)
ERIC Educational Resources Information Center
Narum, Jeanne L., Ed.
In an era when the U.S. educational enterprise, particularly in mathematics, physical sciences, and engineering, has been found to be seriously flawed and has come under criticism from many different sectors, it is essential for science and mathematics educators from the nation's predominantly undergraduate institutions to take the lead in…
ERIC Educational Resources Information Center
Sha, Saliha L.
2012-01-01
This quantitative study investigated whether and to what extent the motivational and sociocultural factors affect female Asian American high school physics students' achievement, their intended major in college, and their planned career goals at work fields. A survey of 62 questions, extracted from subscales of AAMAS,STPQ and PSE, were…
The Keller Plan: A Successful Experiment in Engineering Education.
ERIC Educational Resources Information Center
Koen, Billy; And Others
1985-01-01
Discusses the Keller Plan or personalized system of instruction (PSI), a mastery-oriented, self-paced, modular teaching strategy using student/peer proctors. Success for PSI in chemical engineering, operations research, electrical engineering, and nuclear engineering courses is explained. (DH)
Slush Hydrogen (SLH2) technology development for application to the National Aerospace Plane (NASP)
NASA Technical Reports Server (NTRS)
Dewitt, Richard L.; Hardy, Terry L.; Whalen, Margaret V.; Richter, G. Paul
1989-01-01
The National Aerospace Plane (NASP) program is giving us the opportunity to reach new unique answers in a number of engineering categories. The answers are considered enhancing technology or enabling technology. Airframe materials and densified propellants are examples of enabling technology. The National Aeronautics and Space Administration's Lewis Research Center has the task of providing the technology data which will be used as the basis to decide if slush hydrogen (SLH2) will be the fuel of choice for the NASP. The objectives of this NASA Lewis program are: (1) to provide, where possible, verified numerical models of fluid production, storage, transfer, and feed systems, and (2) to provide verified design criteria for other engineered aspects of SLH2 systems germane to a NASP. This program is a multiyear multimillion dollar effort. The present pursuit of the above listed objectives is multidimensional, covers a range of problem areas, works these to different levels of depth, and takes advantage of the resources available in private industry, academia, and the U.S. Government. The NASA Lewis overall program plan is summarized. The initial implementation of the plan will be unfolded and the present level of efforts in each of the resource areas will be discussed. Results already in hand will be pointed out. A description of additionally planned near-term experimental and analytical work is described.
Selected Works in Water Supply, Water Conservation and Water Quality Planning.
1981-05-01
of change (1970- 1980 ). The Institute’s work reflects the fact that the Corps of Engineers is not a novice in the business of providing water supply for...Urban Water Supply of the Task Force was chaired by the Secretary of the Army. The Subcommittee produced a report on 6 June 1980 evaluating urban water...persuant to the President’s Water Pvizcy message to Congress in 1978. The two other reports were published in 1980 and are discussed below. IWR staff
Learning Reverse Engineering and Simulation with Design Visualization
NASA Technical Reports Server (NTRS)
Hemsworth, Paul J.
2018-01-01
The Design Visualization (DV) group supports work at the Kennedy Space Center by utilizing metrology data with Computer-Aided Design (CAD) models and simulations to provide accurate visual representations that aid in decision-making. The capability to measure and simulate objects in real time helps to predict and avoid potential problems before they become expensive in addition to facilitating the planning of operations. I had the opportunity to work on existing and new models and simulations in support of DV and NASA’s Exploration Ground Systems (EGS).
Study on diversified cultivation orientation and pattern of optoelectronic major undergraduates
NASA Astrophysics Data System (ADS)
Liu, Zhiying
2017-08-01
To improve the research quality preparation for graduate study and looking for job competition ability of undergraduates students, the education orientation objective need to be explicit. Universities need develop undergraduates' cultivation plan according to students' classification. Based on analysis of students export characteristic, there will be corresponding cultivation plan. Keep tracking study during the cultivation plan implantation process, the Curriculum system and related manage documents are revised corresponding to exist problems. There are mainly three kinds of undergraduates' career direction plan for opto-electronic major undergraduates. In addition to the vast majority university graduates opting for direct employment, nearly one third of university students choose to take part in the postgraduate entrance exams and other further education abroad, and also one-tenth choose their own businesses, university chooses are diversified. The exports are further studying as graduates, working and study abroad. Because national defense students are also recruited, the cultivation plan will be diversified to four types. For students, who go to work directly after graduation, the "Excellence engineers plan" is implemented to enhance their practice ability. For students, who will study further as graduate student, the scientific innovation research ability cultivation is paid more attention to make good foundation for their subsequent development. For students, who want to study abroad after graduation, the bilingual teaching method is introduced, and the English environment is built. We asked foreign professionals to give lectures for students. The knowledge range is extending, and the exchange and cooperation chance is provided at the same time. And the cultivation plan is revised during docking with Universities abroad. For national defense students, combat training and other defense theory courses are added to make them familiar with force knowledge. And with national defense students' excellence engineer plan, more army practice chance is provided. The students can integrate into army life much faster. The advantages of national defense students are much more highlighted. The graduates can serve motherland better than before. It is shown from the practice process that the revised cultivation plan is suitable for diversified undergraduates. And the education result is improved in a large amount consequently.
Lincoln Advanced Science and Engineering Reinforcement (LASER) program
NASA Technical Reports Server (NTRS)
Williams, Willie E.
1989-01-01
Lincoln University, under the Lincoln Advanced Science and Engineering Reinforcement (LASER) Program, has identified and successfully recruited over 100 students for majors in technical fields. To date, over 70 percent of these students have completed or will complete technical degrees in engineering, physics, chemistry, and computer science. Of those completing the undergraduate degree, over 40 percent have gone on to graduate and professional schools. This success is attributable to well planned approaches to student recruitment, training, personal motivation, retention, and program staff. Very closely coupled to the above factors is a focus designed to achieve excellence in program services and student performance. Future contributions by the LASER Program to the pool of technical minority graduates will have a significant impact. This is already evident from the success of the students that began the first year of the program. With program plans to refine many of the already successful techniques, follow-on activities are expected to make even greater contributions to the availability of technically trained minorities. For example, undergraduate research exposure, broadened summer, and co-op work experiences will be enhanced.
Rollinson, Andrew N.
2016-01-01
This article tells the story of engineering and technology at Castleford Water Mills from the seventeenth century to the twentieth century through the presentation of recently discovered design plans and deeds, supplemented by other historical research. One of Castleford's mills was operated by Dr Thomas Allinson's Natural Food Company and therefore retained stoneground milling when fashions for white flour prompted other mills to switch to roller systems. The millstones were powered by a high-efficiency breastshot wheel, believed to be the last of its type taken out of industrial service in Britain. Many of its features, and its subsequent longevity, can be attributed to the influential works of William Fairbairn and John Smeaton. Detailed colour designs show the construction specifications of this water-wheel and its civil housing, along with other engineering plans such as a previously unrecorded Henry Simon horizontal turbine. Links with John Smeaton and the entry in his catalogue of designs for Castleford Oil Mill are also explored, and a former flood mill is identified at the site.
GUARD HOUSE AND BARRACKS; SECOND FLOOR PLAN AND DOOR FRAME ...
GUARD HOUSE AND BARRACKS; SECOND FLOOR PLAN AND DOOR FRAME AND WINDOW DETAILS. Navy Department, Bureau of Yards & Docks, Navy Yard, Mar Island, CA. Albert F. Roller, Architect, San Francisco, CA. H.J. Brunnier, Structural Engineer, Sharon Building, San Francisco, CA. Sheet 2 of 15, accompanying specification Noy-4675. Submitted May 8, 1941, last revised July 14, 1941. Yards & Docks drawing no. 160687; P.W. (Public Works) drawing no. 10388-26; file no. 930-CR-4. Scale one eighth inch to one foot (floor plan) and 3 inches to one foot (details). 73 cm x 129 cm. Ink on vellum - Mare Island Naval Shipyard, Guard House & Barracks, Railroad Avenue near Eighteenth Street, Vallejo, Solano County, CA
DOE Office of Scientific and Technical Information (OSTI.GOV)
Karmi, S.
1996-03-04
The United States Air Force (Air Force) has prepared this Remedial Investigation/Feasibility Study (RI/FS) report to present the results of RI/FS activities at four sites located at the Point Lay radar installation. The remedial investigation (RI) field activities were conducted at the Point Lay radar installation during the summer of 1993. The four sites at Point Lay were investigated because they were suspected of being contaminated with hazardous substances. RI activities were conducted using methods and procedures specified in the RI/FS Work Plan, Sampling and Analysis Plan (SAP), and Health and Safety Plan.
40 CFR 270.18 - Specific part B information requirements for waste piles.
Code of Federal Regulations, 2010 CFR
2010-07-01
... complied with or detailed plans and an engineering report describing how the requirements of § 264.90(b)(2) will be met. (c) Detailed plans and an engineering report describing how the waste pile is designed and...(b) of this chapter, submit detailed plans, and engineering and hydrogeological reports, as...
40 CFR 270.18 - Specific part B information requirements for waste piles.
Code of Federal Regulations, 2011 CFR
2011-07-01
... complied with or detailed plans and an engineering report describing how the requirements of § 264.90(b)(2) will be met. (c) Detailed plans and an engineering report describing how the waste pile is designed and...(b) of this chapter, submit detailed plans, and engineering and hydrogeological reports, as...
78 FR 76383 - Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-17
...: LGA runways 4 and 31 runway safety area planning, environmental, and engineering. Brief Description of... Collection at EWR and Use at JFK at a $3.00 PFC Level: JFK taxiway P rehabilitation planning and engineering... delay reduction phase II--planning and engineering. Brief Description of Project Approved for Collection...
40 CFR 1068.510 - How do I prepare and apply my remedial plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
...) AIR POLLUTION CONTROLS GENERAL COMPLIANCE PROVISIONS FOR ENGINE PROGRAMS Reporting Defects and Recalling Engines/Equipment § 1068.510 How do I prepare and apply my remedial plan? (a) In your remedial plan, describe all of the following: (1) The class or category of engines/equipment to be recalled...
NASA Technical Reports Server (NTRS)
1985-01-01
In 1985, a total of 126 talented high school students gained first hand knowledge about science and engineering careers by working directly with a NASA scientist or engineer during the summer. This marked the sixth year of operation for NASA's Summer High School Apprenticeship Research Program (SHARP). The major priority of maintaining the high standards and success of prior years was satisfied. The following eight sites participated in the Program: Ames Research Center, Ames' Dryden Flight Research Facility, Goddard Space Flight Center, Goddard's Wallop Flight Facility, Kennedy Space Center, Langley Research Center, Lewis Research Center, and Marshall Space Flight Center. Tresp Associates served as the SHARP contractor and worked closely with NASA staff at headquarters and the sites just mentioned to plan, implement, and evaluate the program.
This photocopy of an engineering drawing shows the floor plan ...
This photocopy of an engineering drawing shows the floor plan of the Liner Lab, including room functions. Austin, Field & Fry, Architects Engineers, 22311 West Third Street, Los Angeles 57, California: Edwards Test Station Complex Phase II, Jet Propulsion Laboratory, California Institute of Technology, Edwards Air Force Base, Edwards, California: "Liner Laboratory, Floor Plan and Schedules," drawing no. E33/4-2, 26 June 1962. California Institute of Technology, Jet Propulsion Laboratory, Plant Engineering: engineering drawings of structures at JPL Edwards Facility. Drawings on file at JPL Plant Engineering, Pasadena, California. California Institute of Technology, Jet Propulsion Laboratory, Plant Engineering: engineering drawings of structures at JPL Edwards Facility. Drawings on file at JPL Plant Engineering, Pasadena, California - Jet Propulsion Laboratory Edwards Facility, Liner Laboratory, Edwards Air Force Base, Boron, Kern County, CA
PHELPS, CHARLES; RAPPUOLI, RINO; LEVIN, SCOTT; SHORTLIFFE, EDWARD; COLWELL, RITA
2016-01-01
Policy Points: Scarce resources, especially in population health and public health practice, underlie the importance of strategic planning.Public health agencies’ current planning and priority setting efforts are often narrow, at times opaque, and focused on single metrics such as cost‐effectiveness.As demonstrated by SMART Vaccines, a decision support software system developed by the Institute of Medicine and the National Academy of Engineering, new approaches to strategic planning allow the formal incorporation of multiple stakeholder views and multicriteria decision making that surpass even those sophisticated cost‐effectiveness analyses widely recommended and used for public health planning.Institutions of higher education can and should respond by building on modern strategic planning tools as they teach their students how to improve population health and public health practice. Context Strategic planning in population health and public health practice often uses single indicators of success or, when using multiple indicators, provides no mechanism for coherently combining the assessments. Cost‐effectiveness analysis, the most complex strategic planning tool commonly applied in public health, uses only a single metric to evaluate programmatic choices, even though other factors often influence actual decisions. Methods Our work employed a multicriteria systems analysis approach—specifically, multiattribute utility theory—to assist in strategic planning and priority setting in a particular area of health care (vaccines), thereby moving beyond the traditional cost‐effectiveness analysis approach. Findings (1) Multicriteria systems analysis provides more flexibility, transparency, and clarity in decision support for public health issues compared with cost‐effectiveness analysis. (2) More sophisticated systems‐level analyses will become increasingly important to public health as disease burdens increase and the resources to deal with them become scarcer. Conclusions The teaching of strategic planning in public health must be expanded in order to fill a void in the profession's planning capabilities. Public health training should actively incorporate model building, promote the interactive use of software tools, and explore planning approaches that transcend restrictive assumptions of cost‐effectiveness analysis. The Strategic Multi‐Attribute Ranking Tool for Vaccines (SMART Vaccines), which was recently developed by the Institute of Medicine and the National Academy of Engineering to help prioritize new vaccine development, is a working example of systems analysis as a basis for decision support. PMID:26994711
Phelps, Charles; Madhavan, Guruprasad; Rappuoli, Rino; Levin, Scott; Shortliffe, Edward; Colwell, Rita
2016-03-01
Scarce resources, especially in population health and public health practice, underlie the importance of strategic planning. Public health agencies' current planning and priority setting efforts are often narrow, at times opaque, and focused on single metrics such as cost-effectiveness. As demonstrated by SMART Vaccines, a decision support software system developed by the Institute of Medicine and the National Academy of Engineering, new approaches to strategic planning allow the formal incorporation of multiple stakeholder views and multicriteria decision making that surpass even those sophisticated cost-effectiveness analyses widely recommended and used for public health planning. Institutions of higher education can and should respond by building on modern strategic planning tools as they teach their students how to improve population health and public health practice. Strategic planning in population health and public health practice often uses single indicators of success or, when using multiple indicators, provides no mechanism for coherently combining the assessments. Cost-effectiveness analysis, the most complex strategic planning tool commonly applied in public health, uses only a single metric to evaluate programmatic choices, even though other factors often influence actual decisions. Our work employed a multicriteria systems analysis approach--specifically, multiattribute utility theory--to assist in strategic planning and priority setting in a particular area of health care (vaccines), thereby moving beyond the traditional cost-effectiveness analysis approach. (1) Multicriteria systems analysis provides more flexibility, transparency, and clarity in decision support for public health issues compared with cost-effectiveness analysis. (2) More sophisticated systems-level analyses will become increasingly important to public health as disease burdens increase and the resources to deal with them become scarcer. The teaching of strategic planning in public health must be expanded in order to fill a void in the profession's planning capabilities. Public health training should actively incorporate model building, promote the interactive use of software tools, and explore planning approaches that transcend restrictive assumptions of cost-effectiveness analysis. The Strategic Multi-Attribute Ranking Tool for Vaccines (SMART Vaccines), which was recently developed by the Institute of Medicine and the National Academy of Engineering to help prioritize new vaccine development, is a working example of systems analysis as a basis for decision support. © 2016 Milbank Memorial Fund.
Tank waste remediation system multi-year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsectionmore » for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.« less
Tank waste remediation system multi-year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-09-01
The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsectionmore » for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.« less
NASA Technical Reports Server (NTRS)
Chien, Steve; Knight, Russell; Stechert, Andre; Sherwood, Rob; Rabideau, Gregg
1998-01-01
An autonomous spacecraft must balance long-term and short-term considerations. It must perform purposeful activities that ensure long-term science and engineering goals are achieved and ensure that it maintains positive resource margins. This requires planning in advance to avoid a series of shortsighted decisions that can lead to failure, However, it must also respond in a timely fashion to a somewhat dynamic and unpredictable environment. Thus, spacecraft plans must often be modified due to fortuitous events such as early completion of observations and setbacks such as failure to acquire a guidestar for a science observation. This paper describes the use of iterative repair to support continuous modification and updating of a current working plan in light of changing operating context.
Definition study for variable cycle engine testbed engine and associated test program
NASA Technical Reports Server (NTRS)
Vdoviak, J. W.
1978-01-01
The product/study double bypass variable cycle engine (VCE) was updated to incorporate recent improvements. The effect of these improvements on mission range and noise levels was determined. This engine design was then compared with current existing high-technology core engines in order to define a subscale testbed configuration that simulated many of the critical technology features of the product/study VCE. Detailed preliminary program plans were then developed for the design, fabrication, and static test of the selected testbed engine configuration. These plans included estimated costs and schedules for the detail design, fabrication and test of the testbed engine and the definition of a test program, test plan, schedule, instrumentation, and test stand requirements.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1986-05-01
An assessment of needs was completed, and a five-year project plan was developed with input from private industry. Objective is to develop the industrial technology base required for reliable ceramics for application in advanced automotive heat engines. Focus is on structural ceramics for advanced gas turbine and diesel engines, ceramic bearings and attachments, and ceramic coatings for thermal barrier and wear applications in these engines. The work described in this report is organized according to the following WBS project elements: management and coordination; materials and processing (monolithics, ceramic composites, thermal and wear coatings, joining); materials design methodology (contact interfaces, newmore » concepts); data base and life prediction (time-dependent behavior, environmental effects, fracture mechanics, NDE development); and technology transfer. This report includes contributions from all currently active project participants.« less
Automotive Stirling engine development program. [fuel economy assessment
NASA Technical Reports Server (NTRS)
Kitzner, E. W.
1978-01-01
The Ford/DOE automotive Stirling engine development program is directed towards establishing the technological and developmental base that would enable a decision on whether an engineering program should be directed at Stirling engine production. The fuel economy assessment aims to achieve, with a high degree of confidence, the ERDA proposal estimate of 20.6 MPG (gasoline) for a 4500 lb 1WC Stirling engine passenger car. The current M-H fuel economy projection for the 170 HP Stirling engine is 15.7 MPG. The confidence level for this projection is 32%. A confidence level of 29% is projected for a 22.1 MPG estimate. If all of the planned analyses and test work is accomplished at the end of the one year effort, and the projected improvements are substantiated, the confidence levels would rise to 59% for the 20.6 MPG projection and 54% for the 22.1 MPG projection. Progress achieved thus far during the fuel economy assessment is discussed.
NASA Astrophysics Data System (ADS)
Sanovia, J. J.
2004-12-01
In the summer of 2001 and 2004 I experienced internships at the NASA/ Goddard Space Flight Center in Greenbelt, MD. Through these internships I was introduced to Geographical Information Systems and Remote Sensing. My experiences at NASA have also helped me acquire the ability to learn how I can now best utilize my networking contacts at NASA and other connections to facilitate my future plans as an engineer working on Indian and non-Indian Reservation lands. My experiences working at a large agency such as NASA have shown me the significance how a Native American engineer can strive to improve and preserve Indian and non-Indian lands for future generations. Formulating new and inventive methodologies on how to better approach Indian Reservation research while incorporating Native American culture I feel are vital for success. My accomplishments throughout the recent past years have also allowed me conduct outreach to Indian K-12 kids and college students alike.
Pickwell, Andrew J; Dorey, Robert A; Mba, David
2011-09-01
Monitoring the condition of complex engineering structures is an important aspect of modern engineering, eliminating unnecessary work and enabling planned maintenance, preventing failure. Acoustic emissions (AE) testing is one method of implementing continuous nondestructive structural health monitoring. A novel thick-film (17.6 μm) AE sensor is presented. Lead zirconate titanate thick films were fabricated using a powder/sol composite ink deposition technique and mechanically patterned to form a discrete thick-film piezoelectric AE sensor. The thick-film sensor was benchmarked against a commercial AE device and was found to exhibit comparable responses to simulated acoustic emissions.
NASA Technical Reports Server (NTRS)
Matlock, Steve
2001-01-01
This is the final report and addresses all of the work performed on this program. Specifically, it covers vehicle architecture background, definition of six baseline engine cycles, reliability baseline (space shuttle main engine QRAS), and component level reliability/performance/cost for the six baseline cycles, and selection of 3 cycles for further study. This report further addresses technology improvement selection and component level reliability/performance/cost for the three cycles selected for further study, as well as risk reduction plans, and recommendation for future studies.
Lockheed Martin approach to a Reusable Launch Vehicle (RLV)
NASA Astrophysics Data System (ADS)
Elvin, John D.
1996-03-01
This paper discusses Lockheed Martin's perspective on the development of a cost effective Reusable Launch Vehicle (RLV). Critical to a successful Single Stage To Orbit (SSTO) program are; an economic development plan sensitive to fiscal constraints; a vehicle concept satisfying present and future US launch needs; and an operations concept commensurate with a market driven program. Participation in the economic plan by government, industry, and the commercial sector is a key element of integrating our development plan and funding profile. The RLV baseline concept design, development evolution and several critical trade studies illustrate the superior performance achieved by our innovative approach to the problem of SSTO. Findings from initial aerodynamic and aerothermodynamic wind tunnel tests and trajectory analyses on this concept confirm the superior characteristics of the lifting body shape combined with the Linear Aerospike rocket engine. This Aero Ballistic Rocket (ABR) concept captures the essence of The Skunk Works approach to SSTO RLV technology integration and system engineering. These programmatic and concept development topics chronicle the key elements to implementing an innovative market driven next generation RLV.
1960-12-01
such as the Journal of the American Water Works Association, Public Works Magazine, Transactions of the American Society of Civil Engineers, reports of...American Water Works Associa- tion, August 1951. . .P-3 t I Picton 6/ related water use to population growth by application of trends in per capita...Committees on Public Works of the United States Senate and House of Representatives. Of the seven resolutions 1/ pertaining to this survey, five of them
PLANS & ELEVATIONS. United Engineering Company Ltd., Alameda Shipyard. Also ...
PLANS & ELEVATIONS. United Engineering Company Ltd., Alameda Shipyard. Also includes door schedule and a small scale plot plan. No architect noted. Drawn by W.H.H. Plan no. 2-N-5 (U.E. Co. plan no. 10,523). Scale 1/8 inch to the foot. March 10, 1942, last revised 10/6/43. U.S. Navy, Bureau of Yards & Docks, Contract no. bs 76, item no. 22A. Approved for construction October 9, 1943. blueprint - United Engineering Company Shipyard, Warehouse, 2900 Main Street, Alameda, Alameda County, CA
SECOND FLOOR AND ROOF PLANS. United Engineering Company Ltd., Alameda ...
SECOND FLOOR AND ROOF PLANS. United Engineering Company Ltd., Alameda Shipyard, Ship Repair Facilities, Office Building. Second floor plan, and roof plan. John Hudspeth, Architect, at foot of Main Street, Alameda, Calif. Sheet no. A2 of 8 sheets, Plan no. 10,007. Scale 1/8 inch to the foot. March 18, 1942, last revised 9/22/43. U.S. Navy, Bureau of Yards & Docks, Contract no. bs 76. Approved for construction October 9, 1943. blueprint - United Engineering Company Shipyard, Office Building No. 137, 2900 Main Street, Alameda, Alameda County, CA
This photographic copy of an engineering drawing shows floor plans, ...
This photographic copy of an engineering drawing shows floor plans, sections and elevations of Building E-86, with details typical of the steel frame and "Transite" building construction at JPL Edwards Facility. California Institute of Technology, Jet Propulsion Laboratory, Facilities Engineering and Construction Office: "Casting & Curing, Building E-86, Floor Plan, Elevations & Section," drawing no. E86/6, 25 February 1977. California Institute of Technology, Jet Propulsion Laboratory, Plant Engineering: engineering drawings of structures at JPL Edwards Facility. Drawings on file at JPL Plant Engineering, Pasadena, California - Jet Propulsion Laboratory Edwards Facility, Casting & Curing Building, Edwards Air Force Base, Boron, Kern County, CA
The Theory of Planned Behaviour Applied to Search Engines as a Learning Tool
ERIC Educational Resources Information Center
Liaw, Shu-Sheng
2004-01-01
Search engines have been developed for helping learners to seek online information. Based on theory of planned behaviour approach, this research intends to investigate the behaviour of using search engines as a learning tool. After factor analysis, the results suggest that perceived satisfaction of search engine, search engines as an information…
ERIC Educational Resources Information Center
Scientific Manpower Commission, Washington, DC.
This document reports the results of a workshop held to assess the impact of federal programs and legislation on manpower planning for scientists and engineers. Included are presentations relating to manpower utilization and planning via federal government agencies and professional societies for scientists and engineers. It was concluded that the…
Study of solid rocket motor for space shuttle booster, Volume 3: Program acquisition planning
NASA Technical Reports Server (NTRS)
1972-01-01
The program planning acquisition functions for the development of the solid propellant rocket engine for the space shuttle booster is presented. The subjects discussed are: (1) program management, (2) contracts administration, (3) systems engineering, (4) configuration management, and (5) maintenance engineering. The plans for manufacturing, testing, and operations support are included.
AeroPropulsoServoElasticity: Dynamic Modeling of the Variable Cycle Propulsion System
NASA Technical Reports Server (NTRS)
Kopasakis, George
2012-01-01
This presentation was made at the 2012 Fundamental Aeronautics Program Technical Conference and it covers research work for the Dynamic Modeling of the Variable cycle Propulsion System that was done under the Supersonics Project, in the area of AeroPropulsoServoElasticity. The presentation covers the objective for the propulsion system dynamic modeling work, followed by the work that has been done so far to model the variable Cycle Engine, modeling of the inlet, the nozzle, the modeling that has been done to model the affects of flow distortion, and finally presenting some concluding remarks and future plans.
46 CFR 71.65-5 - Plans and specifications required for new construction.
Code of Federal Regulations, 2010 CFR
2010-10-01
... dioxide, foam, and sprinkling systems. (7) Supervised Patrol Route. (e) Marine engineering. (1) For plans required for marine engineering equipment and systems, see subchapter F (Marine Engineering) of this... equipment and systems, see subchapter J (Electrical Engineering) of this chapter. (2) [Reserved] (g...
14 CFR 151.5 - General policies.
Code of Federal Regulations, 2012 CFR
2012-01-01
... planning and engineering proposal or airport development project must provide for the planning or..., approval of an advance planning and engineering proposal or a project application is limited to planning or airport development necessary for civil aviation. (d) Stage development. In any case in which airport...
14 CFR 151.5 - General policies.
Code of Federal Regulations, 2013 CFR
2013-01-01
... planning and engineering proposal or airport development project must provide for the planning or..., approval of an advance planning and engineering proposal or a project application is limited to planning or airport development necessary for civil aviation. (d) Stage development. In any case in which airport...
14 CFR 151.5 - General policies.
Code of Federal Regulations, 2014 CFR
2014-01-01
... planning and engineering proposal or airport development project must provide for the planning or..., approval of an advance planning and engineering proposal or a project application is limited to planning or airport development necessary for civil aviation. (d) Stage development. In any case in which airport...
14 CFR 151.5 - General policies.
Code of Federal Regulations, 2011 CFR
2011-01-01
... planning and engineering proposal or airport development project must provide for the planning or..., approval of an advance planning and engineering proposal or a project application is limited to planning or airport development necessary for civil aviation. (d) Stage development. In any case in which airport...
14 CFR 151.5 - General policies.
Code of Federal Regulations, 2010 CFR
2010-01-01
... planning and engineering proposal or airport development project must provide for the planning or..., approval of an advance planning and engineering proposal or a project application is limited to planning or airport development necessary for civil aviation. (d) Stage development. In any case in which airport...
ERIC Educational Resources Information Center
Utah State Board of Higher Education, Salt Lake City.
For Utah residents to remain in the forefront or even stay competitive economically, the state's work force must acquire the knowledge and skills that match or exceed those of their most technically advanced competitors. A powerful engine for economic growth is a high-quality system of vocational-technical education. The majority of Utah public…
Draft SEI Program Plans: 1994-1998
1993-08-01
process must depersonalize risks so they are viewed as opportunities for program success. Factors for communication are in all the method devel...and the undergraduate level to adequately prepare new soft- ware engineers entering the work force. Educators and trainers of current professionals...learning opportu- nities. The technical foundation for many of these products is the evolving SEI model curricula for graduate and undergraduate degree
Preparing the Next American Manufacturing Workforce
ERIC Educational Resources Information Center
Taraman, Khalil S.
2010-01-01
Manufacturing has a new face--and the future it offers is exciting. But in order to take advantage of what it offers, one needs a plan and he/she has to know how to execute it. In this article, the author discusses how the Society of Manufacturing Engineers (SME) is working to get the message out that the future of advanced manufacturing will…
1986-12-05
and road building equipment manufactured by the Martin Heavy Engineering Plants, economic production unit [VHJ], one of our major suppliers, the...equipped with health care facilities, their major advantage is that they can be rapidly assembled and disassembled even under demanding field conditions... major crude oil pipelines. In the Seventh 5-Year Plan the Czechoslovak Freight Car Works, concern enterprise, in Poprad manufactured numerous BMPNS
Design of an Orbital Inspection Satellite
1986-12-01
ADDRESS (City, State, and ZIP Code ) 10. SOURCE OF FUNDING NUMBERS PROGRAM PROJECT TASK WORK UNITELEMENT NO. NO. NO. CCESSION NO. 11. TITLE (include...Captain, USAF Dh t ibutioni Availabiity Codes Avail adlor Dist [Special December 1986 Approved for public release; distribution...lends itself to the technique of multi -objective analysis. The final step is planning for action. This communicates the entire systems engineering
NASA Technical Reports Server (NTRS)
Wales, Roxana C.
2005-01-01
This viewgraph presentation summarizes the scheduling and planning difficulties inherent in operating the Mars Exploration Rovers (MER) during the overlapping terrestrial day and Martian sol. The presentation gives special empahsis to communication between the teams controlling the rovers from Earth, and keeping track of time on the two planets.
NASA Technical Reports Server (NTRS)
Morring, Frank, Jr.
2004-01-01
Robotic technology being developed out of necessity to keep the Hubble Space Telescope operating could also lead to new levels of man-machine team-work in deep-space exploration down the road-if it survives the near-term scramble for funding. Engineers here who have devoted their NASA careers to the concept of humans servicing the telescope in orbit are planning modifications to International Space Station (ISS) robots that would leave the humans on the ground. The work. forced by post-Columbia flight rules that killed a planned shuttle-servicing mission to Hubble, marks another step in the evolution of robot-partners for human space explorers. "Hubble has always been a pathfider for this agency," says Mike Weiss. Hubble deputy program manager technical. "When the space station was flown and assembled, Hubble was the pathfinder. not just for modularity, but for operations, for assembly techniques. Exploration is the next step. Things we're going to do on Hubble are going to be applied to exploration. It's not just putting a robot in space. It's operating a robot in space. It's adapting that robot to what needs to be done the next time you're up there."
46 CFR 91.55-5 - Plans and specifications required for new construction.
Code of Federal Regulations, 2010 CFR
2010-10-01
... systems. (e) Marine engineering. For plans required for marine engineering equipment and systems, see... electrical engineering, equipment and systems, see subchapter J (Electrical Engineering) of this chapter. (g... bottoms, etc., and including inboard and outboard profile. (b) Hull structure. 1 (1) *Inner Bottom Plating...
A study of mass data storage technology for rocket engine data
NASA Technical Reports Server (NTRS)
Ready, John F.; Benser, Earl T.; Fritz, Bernard S.; Nelson, Scott A.; Stauffer, Donald R.; Volna, William M.
1990-01-01
The results of a nine month study program on mass data storage technology for rocket engine (especially the Space Shuttle Main Engine) health monitoring and control are summarized. The program had the objective of recommending a candidate mass data storage technology development for rocket engine health monitoring and control and of formulating a project plan and specification for that technology development. The work was divided into three major technical tasks: (1) development of requirements; (2) survey of mass data storage technologies; and (3) definition of a project plan and specification for technology development. The first of these tasks reviewed current data storage technology and developed a prioritized set of requirements for the health monitoring and control applications. The second task included a survey of state-of-the-art and newly developing technologies and a matrix-based ranking of the technologies. It culminated in a recommendation of optical disk technology as the best candidate for technology development. The final task defined a proof-of-concept demonstration, including tasks required to develop, test, analyze, and demonstrate the technology advancement, plus an estimate of the level of effort required. The recommended demonstration emphasizes development of an optical disk system which incorporates an order-of-magnitude increase in writing speed above the current state of the art.
FY 1986 current fiscal year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office/RI during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, taskmore » monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. System models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less
Initiatives to Reduce Earthquake Risk of Developing Countries
NASA Astrophysics Data System (ADS)
Tucker, B. E.
2008-12-01
The seventeen-year-and-counting history of the Palo Alto-based nonprofit organization GeoHazards International (GHI) is the story of many initiatives within a larger initiative to increase the societal impact of geophysics and civil engineering. GHI's mission is to reduce death and suffering due to earthquakes and other natural hazards in the world's most vulnerable communities through preparedness, mitigation and advocacy. GHI works by raising awareness in these communities about their risk and about affordable methods to manage it, identifying and strengthening institutions in these communities to manage their risk, and advocating improvement in natural disaster management. Some of GHI's successful initiatives include: (1) creating an earthquake scenario for Quito, Ecuador that describes in lay terms the consequences for that city of a probable earthquake; (2) improving the curricula of Pakistani university courses about seismic retrofitting; (3) training employees of the Public Works Department of Delhi, India on assessing the seismic vulnerability of critical facilities such as a school, a hospital, a police headquarters, and city hall; (4) assessing the vulnerability of the Library of Tibetan Works and Archives in Dharamsala, India; (5) developing a seismic hazard reduction plan for a nonprofit organization in Kathmandu, Nepal that works to manage Nepal's seismic risk; and (6) assisting in the formulation of a resolution by the Council of the Organization for Economic Cooperation and Development (OECD) to promote school earthquake safety among OECD member countries. GHI's most important resource, in addition to its staff and Board of Trustees, is its members and volunteer advisors, who include some of the world's leading earth scientists, earthquake engineers, urban planners and architects, from the academic, public, private and nonprofit sectors. GHI is planning several exciting initiatives in the near future. One would oversee the design and construction of an earthquake- and tsunami-resistant structure in Sumatra to house a tsunami museum, a community training center, and offices of a local NGO that is preparing Padang for the next tsunami. This facility would be designed and built by a team of US and Indonesian academics, architects, engineers and students. Another initiative would launch a collaborative research program on school earthquake safety with the scientists and engineers from the US and the ten Islamic countries that comprise the Economic Cooperation Organization. Finally, GHI hopes to develop internet and satellite communication techniques that will allow earthquake risk managers in the US to interact with masons, government officials, engineers and architects in remote communities of vulnerable developing countries, closing the science and engineering divide.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mulholland, G.; Powers, T.L.
1995-09-29
The goal of this project is to impart to engineering and business students, and to students from industry, the broad knowledge and practical skills to immediately help a manufacturing company become more competitive in any global economy while still providing a high quality work force for the 21st century. An integration of innovative, cross-disciplinary, manufacturing engineering and business education provided hand in hand with industry, will enable students, especially minority students, to have a real impact on manufacturing in this depressed region. The program was shortened and simplified to meet a budget of $2,000,000 versus the $3,000,000 in the-Proposal. Allmore » major objectives in the revised plan for the first year have been achieved with expenditures somewhat under the revised budget. Curriculum development with the advice and assistance of industry is ahead of schedule. Graduate minor degree curricula have been defined in Engineering and in Business. A summer intern project and guest lecture series have been well supported by industry. Facilities including advanced software have been brought on line. Cash and in-kind matching funds from industry, NMSU and the State total over $6m; this is 920% of the TRP funds expended. Cost sharing of cash is ahead of plan, of in-kind is slightly behind. The first group of 21 students have started one semester sooner than planned. The group is 25% minority and 45% female. Industry requests to interview graduates are coming in anticipation of availability in the spring of 1996.« less
Computer aided system engineering for space construction
NASA Technical Reports Server (NTRS)
Racheli, Ugo
1989-01-01
This viewgraph presentation covers the following topics. Construction activities envisioned for the assembly of large platforms in space (as well as interplanetary spacecraft and bases on extraterrestrial surfaces) require computational tools that exceed the capability of conventional construction management programs. The Center for Space Construction is investigating the requirements for new computational tools and, at the same time, suggesting the expansion of graduate and undergraduate curricula to include proficiency in Computer Aided Engineering (CAE) though design courses and individual or team projects in advanced space systems design. In the center's research, special emphasis is placed on problems of constructability and of the interruptability of planned activity sequences to be carried out by crews operating under hostile environmental conditions. The departure point for the planned work is the acquisition of the MCAE I-DEAS software, developed by the Structural Dynamics Research Corporation (SDRC), and its expansion to the level of capability denoted by the acronym IDEAS**2 currently used for configuration maintenance on Space Station Freedom. In addition to improving proficiency in the use of I-DEAS and IDEAS**2, it is contemplated that new software modules will be developed to expand the architecture of IDEAS**2. Such modules will deal with those analyses that require the integration of a space platform's configuration with a breakdown of planned construction activities and with a failure modes analysis to support computer aided system engineering (CASE) applied to space construction.
Decision support and disease management: a logic engineering approach.
Fox, J; Thomson, R
1998-12-01
This paper describes the development and application of PROforma, a unified technology for clinical decision support and disease management. Work leading to the implementation of PROforma has been carried out in a series of projects funded by European agencies over the past 13 years. The work has been based on logic engineering, a distinct design and development methodology that combines concepts from knowledge engineering, logic programming, and software engineering. Several of the projects have used the approach to demonstrate a wide range of applications in primary and specialist care and clinical research. Concurrent academic research projects have provided a sound theoretical basis for the safety-critical elements of the methodology. The principal technical results of the work are the PROforma logic language for defining clinical processes and an associated suite of software tools for delivering applications, such as decision support and disease management procedures. The language supports four standard objects (decisions, plans, actions, and enquiries), each of which has an intuitive meaning with well-understood logical semantics. The development toolset includes a powerful visual programming environment for composing applications from these standard components, for verifying consistency and completeness of the resulting specification and for delivering stand-alone or embeddable applications. Tools and applications that have resulted from the work are described and illustrated, with examples from specialist cancer care and primary care. The results of a number of evaluation activities are included to illustrate the utility of the technology.
Engineering Sciences Strategic Leadership Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hahn, Heidi A.
The purpose of this report is to promote the three key elements of engineering capabilities, staff and engagement in coordination with an R&D investment cycle; and establish an Engineering Steering Council to own and guide this leadership plan.
2017-09-18
Temperature Models Developed for the Missouri River Recovery Management Plan and Environmental Impact Statement En vi ro nm en ta l L ab or at or y...Engineering Center-River Analysis System (HEC-RAS) Water Temperature Models Developed for the Missouri River Recovery Management Plan and Environmental...Prepared for U.S. Army Corps of Engineers Washington, DC 20314-1000 Under Project 396939, “Missouri River Recovery Management Plan and Environmental
NASA Technical Reports Server (NTRS)
Motevalli, Vahid
1994-01-01
This report contains the results of three projects conducted by undergraduate students from Worcester Polytechnic Institute at the NASA's Lewis Research Center under a NASA Award NCC3-312. The students involved in these projects spent part of the summer of 1993 at the Lewis Research Center (LeRC) under the direction of Dr. Howard Ross, head of the Combustion group and other NASA engineers and scientists. The Principal Investigator at Worcester Polytechnic Institute was Professor Vahid Motevalli. Professor Motevalli served as the principal project advisor for two of the three projects which were in Mechanical Engineering. The third project was advised by Professor Duckworth of Electrical and Computer Engineering, while Professor Motevalli acted as the co-advisor. These projects provided an excellent opportunity for the students to participate in the cutting edge research and engineering design, interact with NASA engineers and gain valuable exposure to a real working environment. Furthermore, the combustion group at LeRC was able to forward their goals by employing students to work on topics of immediate use and interest such as experimental research projects planned for the space shuttle, the future space station, or to develop demonstration tools to educate the public about LeRC activities.
Strategy for preventing the waste of human resources
NASA Astrophysics Data System (ADS)
Jones, William E.
1992-05-01
Rapid technological advances and the declining educational preparedness of industrial workers has established a need for new training strategies and initiatives regarding human resource development. The productivity, competitiveness, motivation, and creativity of our people determines whether our business enterprises succeed or fail during the next decade. Due to a change process that many organizations have undertaken to become more competitive toward the year 2000, many of the previous styles of engineering leadership that involves the management of projects and human resources require new approaches. It is also important to recognize that technology has its limits and a broader focus to include the human aspects of accomplishing jobs over the long term is more critical than ever before. More autonomy and the responsibility for broader practices by the professional staff requires that the professional worker operate differently. Business planning and development of the organization's future strategic intent requires a high priority on the human resource linkage to the business plans and strategies. A review of past practices to motivate the worker toward higher productivity clearly shows that past techniques are not as effective in today's work environment. Many practices of organizational and individual leadership don't fit today's approach of worker involvement because they were designed for administrative supervisory control processes. Therefore, if we are going to organize a business strategy that prevents the `waste of human resources,' we need to develop a strategy that is appropriate for the times which considers the attitude of the employees and their work environment. Having worked with scientists and engineers for the majority of my twenty-five year career, I know they see and appreciate the logic of a formula. A formula fits when developing a future strategy because a formula can become a model to enhance balanced planning. In this paper, I want to share this simple formula and illustrate how I have utilized it as a tool for workshop discussions, and human resources planning purposes.
Building information models for astronomy projects
NASA Astrophysics Data System (ADS)
Ariño, Javier; Murga, Gaizka; Campo, Ramón; Eletxigerra, Iñigo; Ampuero, Pedro
2012-09-01
A Building Information Model is a digital representation of physical and functional characteristics of a building. BIMs represent the geometrical characteristics of the Building, but also properties like bills of quantities, definition of COTS components, status of material in the different stages of the project, project economic data, etc. The BIM methodology, which is well established in the Architecture Engineering and Construction (AEC) domain for conventional buildings, has been brought one step forward in its application for Astronomical/Scientific facilities. In these facilities steel/concrete structures have high dynamic and seismic requirements, M&E installations are complex and there is a large amount of special equipment and mechanisms involved as a fundamental part of the facility. The detail design definition is typically implemented by different design teams in specialized design software packages. In order to allow the coordinated work of different engineering teams, the overall model, and its associated engineering database, is progressively integrated using a coordination and roaming software which can be used before starting construction phase for checking interferences, planning the construction sequence, studying maintenance operation, reporting to the project office, etc. This integrated design & construction approach will allow to efficiently plan construction sequence (4D). This is a powerful tool to study and analyze in detail alternative construction sequences and ideally coordinate the work of different construction teams. In addition engineering, construction and operational database can be linked to the virtual model (6D), what gives to the end users a invaluable tool for the lifecycle management, as all the facility information can be easily accessed, added or replaced. This paper presents the BIM methodology as implemented by IDOM with the E-ELT and ATST Enclosures as application examples.
Earthworks logistics in the high density urban development conditions - case study
NASA Astrophysics Data System (ADS)
Sobotka, A.; Blajer, M.
2017-10-01
Realisation of the construction projects on highly urbanised areas carries many difficulties and logistic problems. Earthworks conducted in such conditions constitute a good example of how important it is to properly plan the works and use the technical means of the logistics infrastructure. The construction processes on the observed construction site, in combination with their external logistics service are a complex system, difficult for mathematical modelling and achievement of appropriate data for planning the works. The paper shows describe and analysis of earthworks during construction of the Centre of Power Engineering of AGH in Krakow for two stages of a construction project. At the planning stage in the preparatory phase (before realization) and in the implementation phase of construction works (foundation). In the first case, an example of the use of queuing theory for prediction of excavation time under random work conditions of the excavator and the associated trucks is provided. In the second case there is a change of foundation works technology resulting as a consequence of changes in logistics earthworks. Observation of the construction has confirmed that the use of appropriate methods of construction works management, and in this case agile management, the time and cost of the project have not been exceeded. The success of a project depends on the ability of the contractor to react quickly when changes occur in the design, technology, environment, etc.
NASA Technical Reports Server (NTRS)
1989-01-01
At their March 1988 meeting, members of the National Aeronautics and Space Administration (NASA) Information Resources Management (IRM) Council expressed concern that NASA may not have the infrastructure necessary to support the use of Ada for major NASA software projects. Members also observed that the agency has no coordinated strategy for applying its experiences with Ada to subsequent projects (Hinners, 27 June 1988). To deal with these problems, the IRM Council chair appointed an intercenter Ada and Software Management Assessment Working Group (ASMAWG). They prepared a report (McGarry et al., March 1989) entitled, 'Ada and Software Management in NASA: Findings and Recommendations'. That report presented a series of recommendations intended to enable NASA to develop better software at lower cost through the use of Ada and other state-of-the-art software engineering technologies. The purpose here is to describe the steps (called objectives) by which this goal may be achieved, to identify the NASA officials or organizations responsible for carrying out the steps, and to define a schedule for doing so. This document sets forth four goals: adopt agency-wide software standards and policies; use Ada as the programming language for all mission software; establish an infrastructure to support software engineering, including the use of Ada, and to leverage the agency's software experience; and build the agency's knowledge base in Ada and software engineering. A schedule for achieving the objectives and goals is given.
Site Characterization Report (Building 202). Volume 2. Appendicies A-H.
1996-04-01
Bionetics,Groundwater and Wells, Environmental Science and Engineering, Inc., Installation Assessment of ERADCOM Activities, Environmental Science and...Engineering, Inc., Plan for the Assessment of Contamination at Woodbridge Research Facility, Environmental Science and Engineering, Inc., Remedial...Action Plan for the Woodbridge Research Facility PCB Disposal Site, Environmental Science and Engineering, Inc., Remedial Investigation and
Floor Plans Engine Removal Platform, Hold Down Arm Platform, ...
Floor Plans - Engine Removal Platform, Hold Down Arm Platform, Hydraulic Equipment Platforms, Isometric Cutaway of Engine Removal Platform, Isometric Cutaway of Hold Down Arm Platform, Isometric Cutaway of Hydraulic Platforms and Engine Support System Access - Marshall Space Flight Center, Saturn V S-IC Static Test Facility, West Test Area, Huntsville, Madison County, AL
Code of Federal Regulations, 2010 CFR
2010-01-01
... ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES Electric System Planning... long-term needs for plant additions, improvements, replacements, and retirements for their electric systems. The primary components of the planning system consist of long-range engineering plans and...
58. Photographic copy of original construction plan (St. Paul Engineer's ...
58. Photographic copy of original construction plan (St. Paul Engineer's Office, Wabasha St. Bridge, Plan of Masonry, February 1899); south abutment - Wabasha Street Bridge, Spanning Mississippi River at Wabasha Street, Saint Paul, Ramsey County, MN
Commercial Aircraft Integrated Vehicle Health Management Study
NASA Technical Reports Server (NTRS)
Reveley, Mary S.; Briggs, Jeffrey L.; Evans, Joni K.; Jones, Sharon Monica; Kurtoglu, Tolga; Leone, Karen M.; Sandifer, Carl E.; Thomas, Megan A.
2010-01-01
Statistical data and literature from academia, industry, and other government agencies were reviewed and analyzed to establish requirements for fixture work in detection, diagnosis, prognosis, and mitigation for IVHM related hardware and software. Around 15 to 20 percent of commercial aircraft accidents between 1988 and 2003 involved inalftfnctions or failures of some aircraft system or component. Engine and landing gear failures/malfunctions dominate both accidents and incidents. The IVI vl Project research technologies were found to map to the Joint Planning and Development Office's National Research and Development Plan (RDP) as well as the Safety Working Group's National Aviation Safety Strategic. Plan (NASSP). Future directions in Aviation Technology as related to IVHlvl were identified by reviewing papers from three conferences across a five year time span. A total of twenty-one trend groups in propulsion, aeronautics and aircraft categories were compiled. Current and ftiture directions of IVHM related technologies were gathered and classified according to eight categories: measurement and inspection, sensors, sensor management, detection, component and subsystem monitoring, diagnosis, prognosis, and mitigation.
This ETV test/QA plan for heavy-duty diesel engine testing at the Southwest Research Institute’s Department of Emissions Research (DER) describes how the Federal Test Procedure (FTP), as listed in 40 CFR Part 86 for highway engines and 40 CFR Part 89 for nonroad engines, will be ...
PILING PLAN OF SHIPBUILDING WAYS AND WHIRLEY CRANE SUPPORT. United ...
PILING PLAN OF SHIPBUILDING WAYS AND WHIRLEY CRANE SUPPORT. United Engineering Company Ltd., Alameda Shipbuilding Plant. General plan and two sections. James J. Walsh, Consulting Engineer. Sheet no. 2. Scales 1 inch to 10 feet, and 1/4 inch to one foot. April 20, 1941, revised 5/7/41. blueprint - United Engineering Company Shipyard, Shipway Nos. 1 & 2, 2900 Main Street, Alameda, Alameda County, CA
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 19 2014-07-01 2014-07-01 false Sampling Plans for Selective Enforcement Auditing of Heavy-Duty Engines and Light-Duty Trucks X Appendix X to Part 86 Protection of... AND IN-USE HIGHWAY VEHICLES AND ENGINES Pt. 86, App. X Appendix X to Part 86—Sampling Plans for...
NASA Technical Reports Server (NTRS)
Escher, William J. D.; Roddy, Jordan E.; Hyde, Eric H.
2000-01-01
The Supercharged Ejector Ramjet (SERJ) engine developments of the 1960s, as pursued by The Marquardt Corporation and its associated industry team members, are described. In just three years, engineering work on this combined-cycle powerplant type evolved, from its initial NASA-sponsored reusable space transportation system study status, into a U.S. Air Force/Navy-supported exploratory development program as a candidate 4.5 high-performance military aircraft engine. Bridging a productive transition from the spaceflight to the aviation arena, this case history supports the expectation that fully-integrated airbreathing/rocket propulsion systems hold high promise toward meeting the demanding propulsion requirements of tomorrow's aircraft-like Spaceliner class transportation systems. Lessons to be learned from this "SERJ Story" are offered for consideration by today's advanced space transportation and combined-cycle propulsion researchers and forward-planning communities.
The 2015-2016 SEPMAP Program at NASA JSC: Science, Engineering, and Program Management Training
NASA Technical Reports Server (NTRS)
Graham, L.; Archer, D.; Bakalyar, J.; Berger, E.; Blome, E.; Brown, R.; Cox, S.; Curiel, P.; Eid, R.; Eppler, D.;
2017-01-01
The Systems Engineering Project Management Advancement Program (SEPMAP) at NASA Johnson Space Center (JSC) is an employee development program designed to provide graduate level training in project management and systems engineering. The program includes an applied learning project with engineering and integrated science goals requirements. The teams were presented with a task: Collect a representative sample set from a field site using a hexacopter platform, as if performing a scientific reconnaissance to assess whether the site is of sufficient scientific interest to justify exploration by astronauts. Four teams worked through the eighteen-month course to design customized sampling payloads integrated with the hexacopter, and then operate the aircraft to meet sampling requirements of number (= 5) and mass (= 5g each). The "Mars Yard" at JSC was utilized for this purpose. This project activity closely parallels NASA plans for the future exploration of Mars, where remote sites will be reconnoitered ahead of crewed exploration.
NASA Astrophysics Data System (ADS)
Farwell, D. A.; Svenson, A. J.; Ramsier, R. D.
2001-04-01
We present our recent efforts to design, construct, and test a gas turbine, or jet, engine. Our design utilizes a turbocharger and ignition system from an automobile, and a flame tube/reaction chamber unit fabricated by hand from stainless steel. Once the engine is running, it is completely self-sustaining as long as there is a fuel supply, which in our case is propane. Air is forced into the intake where it is compressed and then injected into the combustion chamber where it is mixed with propane. The spark plugs ignite the air-propane mixture which burns to produce thrust at the exhaust. We have performed operational tests under different environmental conditions and with several turbochargers. We are currently working on adding a lubrication system to the engine, and will discuss our plan to experiment with the reaction chamber and flame tube design in an effort to improve performance and efficiency. *Corresponding author: rex@uakron.edu
NASA Technical Reports Server (NTRS)
1984-01-01
A total of 125 talented high school students had the opportunity to gain first hand experience about science and engineering careers by working directly with a NASA scientist or engineer during the summer. This marked the fifth year of operation for NASA's Summer High School Apprenticehsip Research Program (SHARP). Ferguson Bryan served as the SHARP contractor and worked closely with NASA staff at Headquarters and the eight participating sites to plan, implement, and evaluate the Program. The main objectives were to strengthen SHARP and expand the number of students in the Program. These eight sites participated in the Program: Ames Research Center North, Ames' Dryden Flight Research Facility, Goddard Space Flight Center, Goddard's Wallops Flight Facility, Kennedy Space Center, Langley Research Center, Lewis Research Center, and Marshall Space Flight Center.
NASA Astrophysics Data System (ADS)
Laughton, C.
2008-12-01
For the last half century the physics community has increasingly turned to the use of underground space to conduct basic research. The community is currently planning to conduct a new generation of underground experiments at the Deep Underground Science and Engineering Laboratory (DUSEL). DUSEL will be constructed within the footprint of the defunct Homestake Gold Mine, located in Lead, South Dakota. Physics proposals call for the construction of new caverns in which to conduct major new experiments. Some of the proposed laboratory facilities will be significantly larger and deeper than any previously constructed. The talk will highlight possible opportunities for integrating multi-disciplinary research in to the cavern construction program, and will stress the need to work closely with design and construction contractors to ensure that research goals can be achieve with minimal impact on project work. The constructors of large caverns should be particularly receptive to, and encouraging of geoscience research that could improve the engineering characterization of the rock mass. An improved understanding of the rock mass, as the host construction material, would result in a more reliable cavern design and construction process, and a reduced construction risk to the Project.
Martin Frechilla, J J
1996-01-01
The individuals and circumstances involved in the creation of the first graduate urban studies program in Venezuela are recalled, beginning with the odernization of Caracas under the impulse of President Antonio Guzman Blanco, elected in 1870. Guzman Blanco converted himself into Venezuela's first urbanist with the establishment of organizational frameworks and completion of massive public works projects, which were based largely on the urban models of the US and Europe. Engineering and public health were consolidated as the two most influential sources of professional competence for guiding urban development. By the mid-1930s, growth fueled by petroleum revenues was causing rapid urbanization, and it became apparent that trained professionals able to manage the increasingly complex tasks of urban planning were in short supply. A new surge of modernizing construction began in 1936 and led to a cooperative arrangement with a French firm, whose personnel were to be required to train Venezuelan engineers for future service in urban planning. An influx of refugees from the Spanish Civil War and the increasing influence of urban planning processes in the US were also observed. The National Commission on Urbanism was created in 1946 as a dependency of the Ministry of Planning to facilitate public administration of the development and control of cities. Throughout the period, a debate was underway on the need for a multidisciplinary approach to urban planning versus a primarily architectural or engineering approach. In 1957, some consensus was reached on the need for urban planning to be viewed as more than a speciality of architecture. A framework was developed for a graduate program in 1969 in the Central University of Venezuela. The National Commission on Urbanism was disbanded in 1957, largely because of its excessive focus on architecture to the exclusion of other disciplines relevant to the urbanization process.
32 CFR 651.4 - Responsibilities.
Code of Federal Regulations, 2011 CFR
2011-07-01
...) and Materiel Fielding Plans, Demilitarization/Disposal Plans, system engineering reviews/Integrated... (including NEPA) into the system acquisition strategy, milestone review planning, system engineering, and... copy and make this guidance available on the World Wide Web (WWW) and other electronic means. (13...
5. Photograph of line drawing in possession of Engineering Plans ...
5. Photograph of line drawing in possession of Engineering Plans and Services Division, Rock Island Arsenal. PLAN, UNDATED. - Rock Island Arsenal, Building No. 105, South Avenue between Gillespie Avenue & Second Street, Rock Island, Rock Island County, IL
32 CFR 634.24 - Traffic planning and codes.
Code of Federal Regulations, 2010 CFR
2010-07-01
... enforcement officer, engineer, safety officer, and other concerned staff agencies. Highway engineering representatives from adjacent civil communities must be consulted to ensure the installation plan is compatible... and minor routes, location of traffic control devices, and conditions requiring engineering or...
Photographic copy of floor plan, undated, Civil Engineers Office, in ...
Photographic copy of floor plan, undated, Civil Engineers Office, in possession of Selfridge Base Civil Engineers Office, Mt. Clemens, Michigan - Selfridge Field, Building No. 833, West of Mulberry Street north of George Avenue, Mount Clemens, Macomb County, MI
NASA Technical Reports Server (NTRS)
Meyer, Tom; Zubrin, Robert
1997-01-01
The first phase of the research includes a comprehensive analytical study examining the potential applications for engineering subsystems and mission strategies made possible by such RWGS based subsystems, and will include an actual experimental demonstration and performance characterization of a full-scale brassboard RWGS working unit. By the time of this presentation the laboratory demonstration unit will not yet be operational but we will present the results of our analytical studies to date and plans for the ongoing work.
The production of the AGARD multilingual aeronautical dictionary using computer techniques
NASA Technical Reports Server (NTRS)
Wente, V. A.; Kirschbaum, J. C.; Kuney, J. H.
1981-01-01
The AGARD Multilingual Aeronautical Dictionary (MAD) contained 7,300 technical terms defined in English but also translated into nine other languages. The preparation work was performed by some 250 scientists and engineers who were members of AGARD and involved the translation skills of staff in many of the NATO nations. Nearly all the compilation and setting work for the book was done by computer and automatic photo-composition. The purpose of this publication is to record how the task was approached in terms of management planning.
NASTRAN interfacing modules within the Integrated Analysis Capability (IAC) Program
NASA Technical Reports Server (NTRS)
Frisch, H. P.
1986-01-01
The IAC program provides the framework required for the development of an extensive multidisciplinary analysis capability. Several NASTRAN related capabilities were developed which can all be expanded in a routine manner to meet in-house unique needs. Plans are to complete the work discussed herein and to provide it to the engineering community through COSMIC. Release is to be after the current IAC Level 2 contract work on the IAC executive system is completed and meshed with the interfacing modules and analysis capabilities under development at the GSFC.
New business opportunity: Green field project with new technology
NASA Astrophysics Data System (ADS)
Lee, Seung Jae; Woo, Jong Hun; Shin, Jong Gye
2014-06-01
Since 2009 of global financial crisis, shipbuilding industry has undergone hard times seriously. After such a long depression, the latest global shipping market index shows that the economic recovery of global shipbuilding market is underway. Especially, nations with enormous resources are going to increase their productivity or expanding their shipyards to accommodate a large amount of orders expected in the near future. However, few commercial projects have been carried out for the practical shipyard layout designs even though those can be good commercial opportunities for shipbuilding engineers. Shipbuilding starts with a shipyard construction with a large scale investment initially. Shipyard design and the equipment layout problem, which is directly linked to the productivity of ship production, is an important issue in the production planning of mass production of ships. In many cases, shipbuilding yard design has relied on the experience of the internal engineer, resulting in sporadic and poorly organized processes. Consequently, economic losses and the trial and error involved in such a design process are inevitable problems. The starting point of shipyard construction is to design a shipyard layout. Four kinds of engineering parts required for the shipyard layout design and construction. Those are civil engineering, building engineering, utility engineering and production layout engineering. Among these parts, production layout engineering is most important because its result is used as a foundation of the other engineering parts, and also, determines the shipyard capacity in the shipyard lifecycle. In this paper, the background of shipbuilding industry is explained in terms of engineering works for the recognition of the macro trend. Nextly, preliminary design methods and related case study is introduced briefly by referencing the previous research. Lastly, the designed work of layout design is validated using the computer simulation technology.
Archer, Melissa; Proulx, Joshua; Shane-McWhorter, Laura; Bray, Bruce E; Zeng-Treitler, Qing
2014-01-01
While potential medication-to-medication interaction alerting engines exist in many clinical applications, few systems exist to automatically alert on potential medication to herbal supplement interactions. We have developed a preliminary knowledge base and rules alerting engine that detects 259 potential interactions between 9 supplements, 62 cardiac medications, and 19 drug classes. The rules engine takes into consideration 12 patient risk factors and 30 interaction warning signs to help determine which of three different alert levels to categorize each potential interaction. A formative evaluation was conducted with two clinicians to set initial thresholds for each alert level. Additional work is planned add more supplement interactions, risk factors, and warning signs as well as to continue to set and adjust the inputs and thresholds for each potential interaction.
Students drop out of STEM fields due to poor grades
NASA Astrophysics Data System (ADS)
Balcerak, Ernie
2013-09-01
College students planning to major in science, technology, engineering, and mathematics (STEM) fields often drop out of those fields because of poorer than expected grades, according to a recent study. Conducted by Ralph Stinebrickner of Berea College in Kentucky and Todd Stinebrickner of the University of Western Ontario, the study is a National Bureau of Economic Research working paper published in June 2013.
Launching to the Moon, Mars, and Beyond
NASA Technical Reports Server (NTRS)
Shivers, C. Herbert
2008-01-01
This viewgraph presentation reviews the planned launching to the Moon, and Mars. It is important to build beyond the capacity to ferry astronauts and cargo to low Earth orbit. NASA is starting to design new vehicles using the past lessons to minimize cost, and technical risks. The training and education of engineers that will continue the work of designing, testing and flying the vehicles is important to NASA.
Characterization of Contaminant Migration Potential Through In-Place Sediment Caps
2009-04-01
flocculation step involved the addition of 0.25 mL of 10% weight alum and two drops of 1 N NaOH to the supernatant. Sodium hydroxide was used to adjust the...ACRONYMS AND ABBREVIATIONS ...................................................................................... vi 1.0. PROJECT DESCRIPTION AND...Engineers US EPA U.S. Environmental Protection Agency -8- 1.0. PROJECT DESCRIPTION AND OBJECTIVES This Work Plan has been prepared for the
Galileo mission planning for Low Gain Antenna based operations
NASA Technical Reports Server (NTRS)
Gershman, R.; Buxbaum, K. L.; Ludwinski, J. M.; Paczkowski, B. G.
1994-01-01
The Galileo mission operations concept is undergoing substantial redesign, necessitated by the deployment failure of the High Gain Antenna, while the spacecraft is on its way to Jupiter. The new design applies state-of-the-art technology and processes to increase the telemetry rate available through the Low Gain Antenna and to increase the information density of the telemetry. This paper describes the mission planning process being developed as part of this redesign. Principal topics include a brief description of the new mission concept and anticipated science return (these have been covered more extensively in earlier papers), identification of key drivers on the mission planning process, a description of the process and its implementation schedule, a discussion of the application of automated mission planning tool to the process, and a status report on mission planning work to date. Galileo enhancements include extensive reprogramming of on-board computers and substantial hard ware and software upgrades for the Deep Space Network (DSN). The principal mode of operation will be onboard recording of science data followed by extended playback periods. A variety of techniques will be used to compress and edit the data both before recording and during playback. A highly-compressed real-time science data stream will also be important. The telemetry rate will be increased using advanced coding techniques and advanced receivers. Galileo mission planning for orbital operations now involves partitioning of several scarce resources. Particularly difficult are division of the telemetry among the many users (eleven instruments, radio science, engineering monitoring, and navigation) and allocation of space on the tape recorder at each of the ten satellite encounters. The planning process is complicated by uncertainty in forecast performance of the DSN modifications and the non-deterministic nature of the new data compression schemes. Key mission planning steps include quantifying resource or capabilities to be allocated, prioritizing science observations and estimating resource needs for each, working inter-and intra-orbit trades of these resources among the Project elements, and planning real-time science activity. The first major mission planning activity, a high level, orbit-by-orbit allocation of resources among science objectives, has already been completed; and results are illustrated in the paper. To make efficient use of limited resources, Galileo mission planning will rely on automated mission planning tools capable of dealing with interactions among time-varying downlink capability, real-time science and engineering data transmission, and playback of recorded data. A new generic mission planning tool is being adapted for this purpose.
Galileo mission planning for Low Gain Antenna based operations
NASA Astrophysics Data System (ADS)
Gershman, R.; Buxbaum, K. L.; Ludwinski, J. M.; Paczkowski, B. G.
1994-11-01
The Galileo mission operations concept is undergoing substantial redesign, necessitated by the deployment failure of the High Gain Antenna, while the spacecraft is on its way to Jupiter. The new design applies state-of-the-art technology and processes to increase the telemetry rate available through the Low Gain Antenna and to increase the information density of the telemetry. This paper describes the mission planning process being developed as part of this redesign. Principal topics include a brief description of the new mission concept and anticipated science return (these have been covered more extensively in earlier papers), identification of key drivers on the mission planning process, a description of the process and its implementation schedule, a discussion of the application of automated mission planning tool to the process, and a status report on mission planning work to date. Galileo enhancements include extensive reprogramming of on-board computers and substantial hard ware and software upgrades for the Deep Space Network (DSN). The principal mode of operation will be onboard recording of science data followed by extended playback periods. A variety of techniques will be used to compress and edit the data both before recording and during playback. A highly-compressed real-time science data stream will also be important. The telemetry rate will be increased using advanced coding techniques and advanced receivers. Galileo mission planning for orbital operations now involves partitioning of several scarce resources. Particularly difficult are division of the telemetry among the many users (eleven instruments, radio science, engineering monitoring, and navigation) and allocation of space on the tape recorder at each of the ten satellite encounters. The planning process is complicated by uncertainty in forecast performance of the DSN modifications and the non-deterministic nature of the new data compression schemes. Key mission planning steps include quantifying resource or capabilities to be allocated, prioritizing science observations and estimating resource needs for each, working inter-and intra-orbit trades of these resources among the Project elements, and planning real-time science activity. The first major mission planning activity, a high level, orbit-by-orbit allocation of resources among science objectives, has already been completed; and results are illustrated in the paper. To make efficient use of limited resources, Galileo mission planning will rely on automated mission planning tools capable of dealing with interactions among time-varying downlink capability, real-time science and engineering data transmission, and playback of recorded data. A new generic mission planning tool is being adapted for this purpose.
Su, Chuan-Jun; Chiang, Chang-Yu; Chih, Meng-Chun
2014-03-07
Good physical fitness generally makes the body less prone to common diseases. A personalized exercise plan that promotes a balanced approach to fitness helps promotes fitness, while inappropriate forms of exercise can have adverse consequences for health. This paper aims to develop an ontology-driven knowledge-based system for generating custom-designed exercise plans based on a user's profile and health status, incorporating international standard Health Level Seven International (HL7) data on physical fitness and health screening. The generated plan exposing Representational State Transfer (REST) style web services which can be accessed from any Internet-enabled device and deployed in cloud computing environments. To ensure the practicality of the generated exercise plans, encapsulated knowledge used as a basis for inference in the system is acquired from domain experts. The proposed Ubiquitous Exercise Plan Generation for Personalized Physical Fitness (UFIT) will not only improve health-related fitness through generating personalized exercise plans, but also aid users in avoiding inappropriate work outs.
Su, Chuan-Jun; Chiang, Chang-Yu; Chih, Meng-Chun
2014-01-01
Good physical fitness generally makes the body less prone to common diseases. A personalized exercise plan that promotes a balanced approach to fitness helps promotes fitness, while inappropriate forms of exercise can have adverse consequences for health. This paper aims to develop an ontology-driven knowledge-based system for generating custom-designed exercise plans based on a user's profile and health status, incorporating international standard Health Level Seven International (HL7) data on physical fitness and health screening. The generated plan exposing Representational State Transfer (REST) style web services which can be accessed from any Internet-enabled device and deployed in cloud computing environments. To ensure the practicality of the generated exercise plans, encapsulated knowledge used as a basis for inference in the system is acquired from domain experts. The proposed Ubiquitous Exercise Plan Generation for Personalized Physical Fitness (UFIT) will not only improve health-related fitness through generating personalized exercise plans, but also aid users in avoiding inappropriate work outs. PMID:24608002
Job Prospects of 1971 Graduates. Engineering Manpower Bulletin Number 20.
ERIC Educational Resources Information Center
Alden, John D.
Statistics for 33,902 of 1971 engineering graduates were used to describe job prospects of the graduates. Findings include: (1) engineering graduates were largely successful in finding jobs or carrying out other plans; (2) about one out of every five engineering graduates at the bachelor's and master's degree levels had plans to continue full-time…
Demanded competences in the agricultural engineering sector in Spain
NASA Astrophysics Data System (ADS)
Perdigones, A.; García, J. L.; Benavente, R. M.; Tarquis, A. M.
2009-04-01
An engineering education should prepare students, i.e., emerging engineers, to use problem-solving processes that combine creativity and imagination with rigour and discipline. The emphasis on training engineers may be best placed on answering the needs of industry; indeed, many proposals are now being made to try to reduce the gap between the educational and industrial communities. Training in the use of certain skills or competences may be one way of better preparing engineering undergraduates for eventual employment in industry. However, industry's needs in this respect must first be known. The aim of this work was to determine which skills are used by practising agricultural engineers with the aim of incorporating training in their use into our department's teaching curriculum. Three surveys were undertaken to determine which skills are demanded by agricultural engineers in their professional activities in Spain. Surveys were carried out by the Department of Rural Engineering, Technical University of Madrid (Spain), analysing two related degrees (agricultural engineer with a duration of the study plan of three and five years, respectively) during the courses 2006/07 and 2007/08. The first survey determined the competences acquired by the students along their academic studies (371 students interviewed). The second survey determined the skills demanded by the enterprises of the agricultural sector (50 enterprises interviewed). The third survey determined the skills demanded by the agricultural engineers working in the sector (70 engineers interviewed), specifically asking about the computer programs used by practising agricultural engineers. Surveys showed important differences between the competences demanded by the enterprises and the competences acquired by the students at the university. Enterprises mainly demanded general competences (team working, time organizing, and skills with computer programs) and were less interested in specific technical skills (engineering, economy, biological competences). These differences suggest it might be a good idea to increase the amount of time devoted to the skills demanded by the enterprises. The software packages most commonly used by practising engineers were Microsoft Office / Excel (used by 79% of respondents) and CAD (56%), as well as budgeting (27%), statistical (21%), engineering (15%) and GIS (13%) programs. As a result of this survey our university department opened an additional computer suite in order to provide students practical experience in the use of the demanded competences. The results of this survey underline the importance of competence training in this and perhaps other fields of engineering.
NASA Satellite Laser Ranging Network
NASA Technical Reports Server (NTRS)
Carter, David L.
2004-01-01
I will be participating in the International Workshop on Laser Ranging. I will be presenting to the International Laser Ranging Service (ILRS) general body meeting on the recent accomplishments and status of the NASA Satellite Laser Ranging (SLR) Network. The recent accomplishments and NASA's future plans will be outlined and the benefits to the scientific community will be addressed. I am member of the ILRS governing board, the Missions working group, and the Networks & Engineering working group. I am the chairman of the Missions Working and will be hosting a meeting during the week of the workshop. I will also represent the NASA SLR program at the ILRS governing board and other working group meetings.
13. Photograph of line drawing in possession of Engineering Plans ...
13. Photograph of line drawing in possession of Engineering Plans and Services Division, Rock Island Arsenal. BASEMENT PLAN, 1920. - Rock Island Arsenal, Building No. 90, East Avenue between North Avenue & King Drive, Rock Island, Rock Island County, IL
6. photograph of line drawing in possession of Engineering Plans ...
6. photograph of line drawing in possession of Engineering Plans and Services Division, Rock Island Arsenal. ELEVATIONS AND PLANS FOR POWDER BARREL RACK, 1889. - Rock Island Arsenal, Building No. 280, Sylvan Drive, Rock Island, Rock Island County, IL
15. Photograph of line drawing in possession of Engineering Plans ...
15. Photograph of line drawing in possession of Engineering Plans and Services Division, Rock Island Arsenal. SECOND FLOOR PLAN, 1920. - Rock Island Arsenal, Building No. 90, East Avenue between North Avenue & King Drive, Rock Island, Rock Island County, IL
14. Photograph of line drawing in possession of Engineering Plans ...
14. Photograph of line drawing in possession of Engineering Plans and Services Division, Rock Island Arsenal. FIRST FLOOR PLAN, 1920. - Rock Island Arsenal, Building No. 90, East Avenue between North Avenue & King Drive, Rock Island, Rock Island County, IL
16. Photograph of line drawing in possession of Engineering Plans ...
16. Photograph of line drawing in possession of Engineering Plans and Services Division, Rock Island Arsenal. ATTIC PLAN, 1920. - Rock Island Arsenal, Building No. 90, East Avenue between North Avenue & King Drive, Rock Island, Rock Island County, IL
Photocopy of plan (in U.S. Army office of Army Engineers ...
Photocopy of plan (in U.S. Army office of Army Engineers plans and drawings, Fort Hancock and Sandy hook proving ground, record group 7, drawer 44, Cartographic and Architectural branc, The National Archives, Washington, DC), U.S. Engineer Office, New York District, Harbor Defenses of New York Mine Boathouse, location plan and elevations, Fort Hancock, New Jersey, July 1943 Detail of western docking structure - U.S. Coast Guard Sandy Hook Station, Western Docking Structure, West of intersection of Canfield Road & Hartshorne Drive, Highlands, Monmouth County, NJ
Do-It-Yourself Additives Recharge Auto Air Conditioning
NASA Technical Reports Server (NTRS)
2010-01-01
In planning for a return mission to the Moon, NASA aimed to improve the thermal control systems that keep astronauts comfortable and cool while inside a spacecraft. Goddard Space Flight Center awarded a Small Business Innovation Research (SBIR) contract to Mainstream Engineering Corporation, of Rockledge, Florida, to develop a chemical/mechanical heat pump. IDQ Inc., of Garland, Texas, exclusively licensed the technology and incorporates it into its line of Arctic Freeze products for automotive air conditioning applications. While working on the design, Mainstream Engineering came up with a unique liquid additive called QwikBoost to enhance the performance of the advanced heat pump design.
Toward a Fast-Response Active Turbine Tip Clearance Control
NASA Technical Reports Server (NTRS)
Melcher, Kevin J.; Kypuros, Javier A.
2003-01-01
This paper describes active tip clearance control research being conducted by NASA to improve turbine engine systems. The target application for this effort is commercial aircraft engines. However, technologies developed for clearance control can benefit a broad spectrum of current and future turbomachinery. The first portion of the paper addresses the research from a programmatic viewpoint. Recent studies that provide motivation for the work, identification of key technologies, and NASA's plan for addressing deficiencies in the technologies are discussed. The later portion of the paper drills down into one of the key technologies by presenting equations and results for a preliminary dynamic model of the tip clearance phenomena.
12. Historic plot plan and drawings index for rocket engine ...
12. Historic plot plan and drawings index for rocket engine test facility, June 28, 1956. NASA GRC drawing number CE-101810. On file at NASA Glenn Research Center. - Rocket Engine Testing Facility, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH
Improving tsunami resiliency: California's Tsunami Policy Working Group
Real, Charles R.; Johnson, Laurie; Jones, Lucile M.; Ross, Stephanie L.; Kontar, Y.A.; Santiago-Fandiño, V.; Takahashi, T.
2014-01-01
California has established a Tsunami Policy Working Group to facilitate development of policy recommendations for tsunami hazard mitigation. The Tsunami Policy Working Group brings together government and industry specialists from diverse fields including tsunami, seismic, and flood hazards, local and regional planning, structural engineering, natural hazard policy, and coastal engineering. The group is acting on findings from two parallel efforts: The USGS SAFRR Tsunami Scenario project, a comprehensive impact analysis of a large credible tsunami originating from an M 9.1 earthquake in the Aleutian Islands Subduction Zone striking California’s coastline, and the State’s Tsunami Preparedness and Hazard Mitigation Program. The unique dual-track approach provides a comprehensive assessment of vulnerability and risk within which the policy group can identify gaps and issues in current tsunami hazard mitigation and risk reduction, make recommendations that will help eliminate these impediments, and provide advice that will assist development and implementation of effective tsunami hazard risk communication products to improve community resiliency.
Magnitude and distribution of trunk stresses in telecommunications engineers.
Nicholson, A S; David, P R; Sheppard, N J
1981-01-01
The incidence of back injuries has been shown to be greater in occupations as heavy manual work than light manual work. To plan a programme aimed at reducing the incidence of back injuries in industry those workers at high risk of incurring handling accidents and back injuries need to be identified and a knowledge of the specific occupational factors causing such injuries sought. This has been achieved for telecommunications engineers using epidemiological and radio pressure pill methodologies. The results verify the correlation between the back injury rates and physical work stresses of different occupational groups. The magnitude and relative frequency of trunk stresses in hazardous tasks has been determined and compared with those with lower incidences of back disorders. The study has confirmed that in examining manual handling hazards in industrial male populations a critical value of truncal stress can be applied and used to determine the safety of occupational factors in relation to their potential causing or contributing to degenerative back diseases. PMID:7317300
FIRST FLOOR PLAN AND SCHEDULES. United Engineering Company Ltd., Alameda ...
FIRST FLOOR PLAN AND SCHEDULES. United Engineering Company Ltd., Alameda Shipyard, Ship Repair Facilities, Office Building. First floor plan, door transom schedule, interior finish schedule, sash schedule, exterior color schedule, and location plot plan. John Hudspeth, Architect, at foot of Main Street, Alameda, Calif. Sheet no. Al of 8 sheets, Plan no. 10,007. Scale 1/8 inch to the foot. March 18, 1942, last revised 9/25/43. U.S. Navy, Bureau of Yards & Docks, Contract no. bs 76. Approved for construction October 9, 1943. blueprint - United Engineering Company Shipyard, Office Building No. 137, 2900 Main Street, Alameda, Alameda County, CA
DOE Office of Scientific and Technical Information (OSTI.GOV)
Durfee, Justin David; Frazier, Christopher Rawls; Bandlow, Alisa
Sandia National Laboratories (Sandia) is in Phase 3 Sustainment of development of a prototype tool, currently referred to as the Contingency Contractor Optimization Tool - Prototype (CCOTP), under the direction of OSD Program Support. CCOT-P is intended to help provide senior Department of Defense (DoD) leaders with comprehensive insight into the global availability, readiness and capabilities of the Total Force Mix. The CCOT-P will allow senior decision makers to quickly and accurately assess the impacts, risks and mitigating strategies for proposed changes to force/capabilities assignments, apportionments and allocations options, focusing specifically on contingency contractor planning. During Phase 2 of themore » program, conducted during fiscal year 2012, Sandia developed an electronic storyboard prototype of the Contingency Contractor Optimization Tool that can be used for communication with senior decision makers and other Operational Contract Support (OCS) stakeholders. Phase 3 used feedback from demonstrations of the electronic storyboard prototype to develop an engineering prototype for planners to evaluate. Sandia worked with the DoD and Joint Chiefs of Staff strategic planning community to get feedback and input to ensure that the engineering prototype was developed to closely align with future planning needs. The intended deployment environment was also a key consideration as this prototype was developed. Initial release of the engineering prototype was done on servers at Sandia in the middle of Phase 3. In 2013, the tool was installed on a production pilot server managed by the OUSD(AT&L) eBusiness Center. The purpose of this document is to specify the CCOT-P engineering prototype platform requirements as of May 2016. Sandia developed the CCOT-P engineering prototype using common technologies to minimize the likelihood of deployment issues. CCOT-P engineering prototype was architected and designed to be as independent as possible of the major deployment components such as the server hardware, the server operating system, the database, and the web server. This document describes the platform requirements, the architecture, and the implementation details of the CCOT-P engineering prototype.« less
Variable Cycle Engine Technology Program Planning and Definition Study
NASA Technical Reports Server (NTRS)
Westmoreland, J. S.; Stern, A. M.
1978-01-01
The variable stream control engine, VSCE-502B, was selected as the base engine, with the inverted flow engine concept selected as a backup. Critical component technologies were identified, and technology programs were formulated. Several engine configurations were defined on a preliminary basis to serve as demonstration vehicles for the various technologies. The different configurations present compromises in cost, technical risk, and technology return. Plans for possible variably cycle engine technology programs were formulated by synthesizing the technology requirements with the different demonstrator configurations.
A Planning Approach of Engineering Characteristics Based on QFD-TRIZ Integrated
NASA Astrophysics Data System (ADS)
Liu, Shang; Shi, Dongyan; Zhang, Ying
Traditional QFD planning method compromises contradictions between engineering characteristics to achieve higher customer satisfaction. However, this compromise trade-off can not eliminate the contradictions existing among the engineering characteristics which limited the overall customer satisfaction. QFD (Quality function deployment) integrated with TRIZ (the Russian acronym of the Theory of Inventive Problem Solving) becomes hot research recently for TRIZ can be used to solve contradictions between engineering characteristics which construct the roof of HOQ (House of quality). But, the traditional QFD planning approach is not suitable for QFD integrated with TRIZ for that TRIZ requires emphasizing the contradictions between engineering characteristics at problem definition stage instead of compromising trade-off. So, a new planning approach based on QFD / TRIZ integration is proposed in this paper, which based on the consideration of the correlation matrix of engineering characteristics and customer satisfaction on the basis of cost. The proposed approach suggests that TRIZ should be applied to solve contradictions at the first step, and the correlation matrix of engineering characteristics should be amended at the second step, and at next step IFR (ideal final result) must be validated, then planning execute. An example is used to illustrate the proposed approach. The application indicated that higher customer satisfaction can be met and the contradictions between the characteristic parameters are eliminated.
40 CFR 35.937 - Subagreements for architectural or engineering services.
Code of Federal Regulations, 2013 CFR
2013-07-01
..., surveys, evaluations, consultations, planning, programing, conceptual designs, plans and specifications... engineering services. Those professional services associated with research, development, design and...
40 CFR 35.937 - Subagreements for architectural or engineering services.
Code of Federal Regulations, 2011 CFR
2011-07-01
... engineering services. Those professional services associated with research, development, design and..., surveys, evaluations, consultations, planning, programing, conceptual designs, plans and specifications...
40 CFR 35.937 - Subagreements for architectural or engineering services.
Code of Federal Regulations, 2014 CFR
2014-07-01
... engineering services. Those professional services associated with research, development, design and..., surveys, evaluations, consultations, planning, programing, conceptual designs, plans and specifications...
40 CFR 35.937 - Subagreements for architectural or engineering services.
Code of Federal Regulations, 2012 CFR
2012-07-01
... engineering services. Those professional services associated with research, development, design and..., surveys, evaluations, consultations, planning, programing, conceptual designs, plans and specifications...
40 CFR 35.937 - Subagreements for architectural or engineering services.
Code of Federal Regulations, 2010 CFR
2010-07-01
... engineering services. Those professional services associated with research, development, design and..., surveys, evaluations, consultations, planning, programing, conceptual designs, plans and specifications...
5. Photograph of line drawing in possession of Engineering Plans ...
5. Photograph of line drawing in possession of Engineering Plans and Services Division, Rock Island Arsenal. PLAN, ELEVATION, AND SECTION, 1874; TRACING, 1935. - Rock Island Arsenal, Building No. 53, North Avenue North of Midpoint, Rock Island, Rock Island County, IL
8. Photograph of line drawing in possession of Engineering Plans ...
8. Photograph of line drawing in possession of Engineering Plans and Services Division, Rock Island Arsenal. PLAN AND SECTION, AUGUST 24, 1874. - Rock Island Arsenal, Building No. 105, South Avenue between Gillespie Avenue & Second Street, Rock Island, Rock Island County, IL
TRANSMISSION NETWORK PLANNING METHOD FOR COMPARATIVE STUDIES (JOURNAL VERSION)
An automated transmission network planning method for comparative studies is presented. This method employs logical steps that may closely parallel those taken in practice by the planning engineers. Use is made of a sensitivity matrix to simulate the engineers' experience in sele...
Groundwater monitoring well assessment final work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-10-01
Jacobs Engineering Group Inc. (JEG) has been contracted by Environmental Management Operations (EMO) to develop and implement a Groundwater Monitoring Well Assessment Plan for Canal Creek in the Edgewood Area of Aberdeen Proving Ground (APG-EA). The task will be performed under the provisions of Master Agreement 071914-A-D7, Task Order 142133. The project consists of assessing the condition of existing groundwater monitoring wells in the Canal Creek Area prior to a groundwater sampling program. The following Work Plan describes the technical approach that will be used to conduct field work for the project. Integrity of some monitoring wells installed at APG-EAmore » has come into question because of problems with well completions that were detected in wells at the O-field Study Area during a recent sampling event. Because of this, EPA and APG-DSHE officials have requested a well integrity assessment for a percentage of 168 monitoring wells installed at the Canal Creek Study Area(14 by USATHAMA, 152 by USGS). Results of the well assessment will be used to determine if these wells were completed in a fashion that minimizes the potential for either cross-contamination of aquifers or leakage of water from the surface into the well.« less
This ETV test/QA plan for heavy-duty diesel engine testing at the Southwest Research Institute’s Department of Emissions Research (DER) describes how the Federal Test Procedure (FTP), as listed in 40 CFR Part 86 for highway engines and 40 CFR Part 89 for nonroad engines, will be ...
Academic Instruction with the Visible V-8 Engine. The Coordinated Correlated Instructional Program.
ERIC Educational Resources Information Center
Davis, W. J.
The book presents three 93-day lesson plans to motivate and teach handicapped secondary students basic academic skills in reading and language arts, English, and mathematics in conjunction with learning about automobile engines from Revell's Visible V8 Engine Kit. Each lesson plan is correlated with the Visible V8 Engine Kit and includes daily…
Code of Federal Regulations, 2013 CFR
2013-07-01
... Enforcement Auditing of Marine Engines A Appendix A to Subpart G of Part 91 Protection of Environment...-IGNITION ENGINES Selective Enforcement Auditing Regulations Pt. 91, Subpt. G, App. A Appendix A to Subpart G of Part 91—Sampling Plans for Selective Enforcement Auditing of Marine Engines Table 1—Sampling...
Code of Federal Regulations, 2010 CFR
2010-07-01
... Enforcement Auditing of Nonroad Engines A Appendix A to Subpart F of Part 89 Protection of Environment... NONROAD COMPRESSION-IGNITION ENGINES Selective Enforcement Auditing Pt. 89, Subpt. F, App. A Appendix A to Subpart F of Part 89—Sampling Plans for Selective Enforcement Auditing of Nonroad Engines Table 1—Sampling...
Code of Federal Regulations, 2010 CFR
2010-07-01
... Enforcement Auditing of Marine Engines A Appendix A to Subpart G of Part 91 Protection of Environment...-IGNITION ENGINES Selective Enforcement Auditing Regulations Pt. 91, Subpt. G, App. A Appendix A to Subpart G of Part 91—Sampling Plans for Selective Enforcement Auditing of Marine Engines Table 1—Sampling...
Code of Federal Regulations, 2010 CFR
2010-07-01
... Enforcement Auditing of Small Nonroad Engines A Appendix A to Subpart F of Part 90 Protection of Environment...-IGNITION ENGINES AT OR BELOW 19 KILOWATTS Selective Enforcement Auditing Pt. 90, Subpt. F, App. A Appendix A to Subpart F of Part 90—Sampling Plans for Selective Enforcement Auditing of Small Nonroad Engines...
7. Photograph of line drawing in possession of Engineering Plans ...
7. Photograph of line drawing in possession of Engineering Plans and Services Division, Rock Island Arsenal. ROOF PLAN, 1871. DELINEATOR: W. OTTO GRONEN. - Rock Island Arsenal, Building No. 105, South Avenue between Gillespie Avenue & Second Street, Rock Island, Rock Island County, IL
Joint Knowledge Generation Between Climate Science and Infrastructure Engineering
NASA Astrophysics Data System (ADS)
Stoner, A. M. K.; Hayhoe, K.; Jacobs, J. M.
2015-12-01
Over the past decade the engineering community has become increasingly aware of the need to incorporate climate projections into the planning and design of sensitive infrastructure. However, this is a task that is easier said than done. This presentation will discuss some of the successes and hurdles experiences through the past year, from a climate scientist's perspective, working with engineers in infrastructure research and applied engineering through the Infrastructure & Climate Network (ICNet). Engineers rely on strict building codes and ordinances, and can be the subject of lawsuits if those codes are not followed. Matters are further complicated by the uncertainty inherent to climate projections, which include short-term natural variability, as well as the influence of scientific uncertainty and even human behavior on the rate and magnitude of change. Climate scientists typically address uncertainty by creating projections based on multiple models following different future scenarios. This uncertainty is difficult to incorporate into engineering projects, however, due to the fact that they cannot build two different bridges, one allowing for a lower amount of change, and another for a higher. More often than not there is a considerable difference between the costs of building two such bridges, which means that available funds often are the deciding factor. Discussions of climate science are often well received with engineers who work in the research area of infrastructure; going a step further, however, and implementing it in applied engineering projects can be challenging. This presentation will discuss some of the challenges and opportunities inherent to collaborations between climate scientists and transportation engineers, drawing from a range of studies including truck weight restrictions on roads during the spring thaw, and bridge deck performance due to environmental forcings.
Propulsion Technology Lifecycle Operational Analysis
NASA Technical Reports Server (NTRS)
Robinson, John W.; Rhodes, Russell E.
2010-01-01
The paper presents the results of a focused effort performed by the members of the Space Propulsion Synergy Team (SPST) Functional Requirements Sub-team to develop propulsion data to support Advanced Technology Lifecycle Analysis System (ATLAS). This is a spreadsheet application to analyze the impact of technology decisions at a system-of-systems level. Results are summarized in an Excel workbook we call the Technology Tool Box (TTB). The TTB provides data for technology performance, operations, and programmatic parameters in the form of a library of technical information to support analysis tools and/or models. The lifecycle of technologies can be analyzed from this data and particularly useful for system operations involving long running missions. The propulsion technologies in this paper are listed against Chemical Rocket Engines in a Work Breakdown Structure (WBS) format. The overall effort involved establishing four elements: (1) A general purpose Functional System Breakdown Structure (FSBS). (2) Operational Requirements for Rocket Engines. (3) Technology Metric Values associated with Operating Systems (4) Work Breakdown Structure (WBS) of Chemical Rocket Engines The list of Chemical Rocket Engines identified in the WBS is by no means complete. It is planned to update the TTB with a more complete list of available Chemical Rocket Engines for United States (US) engines and add the Foreign rocket engines to the WBS which are available to NASA and the Aerospace Industry. The Operational Technology Metric Values were derived by the SPST Sub-team in the form of the TTB and establishes a database for users to help evaluate and establish the technology level of each Chemical Rocket Engine in the database. The Technology Metric Values will serve as a guide to help determine which rocket engine to invest technology money in for future development.
Aquatic Ecosystem Enhancement at Mountaintop Mining Sites Symposium
DOE Office of Scientific and Technical Information (OSTI.GOV)
Black, D. Courtney; Lawson, Peter; Morgan, John
2000-01-12
Welcome to this symposium which is part of the ongoing effort to prepare an Environmental Impact Statement (EIS) regarding mountaintop mining and valley fills. The EIS is being prepared by the U.S. Environmental Protection Agency, U.S. Army Corps of Engineers, U.S. Office of Surface Mining, and U.S. Fish and Wildlife Service, in cooperation with the State of West Virginia. Aquatic Ecosystem Enhancement (AEE) at mountaintop mining sites is one of fourteen technical areas identified for study by the EIS Interagency Steering Committee. Three goals were identified in the AEE Work Plan: 1. Assess mining and reclamation practices to show howmore » mining operations might be carried out in a way that minimizes adverse impacts to streams and other environmental resources and to local communities. Clarify economic and technical constraints and benefits. 2. Help citizens clarify choices by showing whether there are affordable ways to enhance existing mining, reclamation, mitigation processes and/or procedures. 3. Ide identify data needed to improve environmental evaluation and design of mining projects to protect the environment. Today’s symposium was proposed in the AEE Team Work Plans but coordinated planning for the event began September 15, 1999 when representatives from coal industry, environmental groups and government regulators met in Morgantown. The meeting participants worked with a facilitator from the Canaan Valley Institute to outline plans for the symposium. Several teams were formed to carry out the plans we outlined in the meeting.« less
17. Photocopy of drawing (1961 civil engineering drawing by Kaiser ...
17. Photocopy of drawing (1961 civil engineering drawing by Kaiser Engineers) SITE PLAN, PLOT PLAN, AND LOCATION MAP FOR VEHICLE SUPPORT BUILDING, SHEET C-1 - Vandenberg Air Force Base, Space Launch Complex 3, Vehicle Support Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
Stabler, Herman
1911-01-01
A systematic study of the waters likely to be utilized on the Reclamation Service projects was made in order to determine the influence of the salinity of the waters on the growth of vegetation and the effect of suspended matter in silting canals and reservoirs. The work was begun early in 1905, under the direction of Thomas H. Means, engineer, and was continued during 1906 and until May, 1907, under the direction of W. H. Heileman, engineer. The analyses were made in a laboratory established at quarters provided by the University of California at Berkeley, Cal., by C. H. Stone, P. L. McCreary, F. M. Eaton, O. J. Hawley, W. C. Riddell, F. T. Berry, H. A. Burns, J. H. Hampson, J. A. Pearce, and M. Vaygouny, the greater part of the work being that of the first five named. C. H. Stone was chemist in charge at the beginning of the investigations and is chiefly responsible for the plan of the analytical work and the methods of analysis.The results of the investigations were prepared for publication under instructions from F. H. Newell, Director of the United States Reclamation Service, by Herman Stabler, assistant engineer, who assembled and checked- the analyses, compiled the accompanying stream-flow data from records of the United States Geological Survey, and computed daily discharge of suspended matter and dissolved solids, under the supervision of D. W. Murphy, engineer in charge of Washington office engineering.
NASA Astrophysics Data System (ADS)
Vanichai, Yupa
During the last decade of twentieth century astronomical articles in Thai scientific magazines were out of date. Interacting galaxies blackholes and other celestial objects beyond solar system were hardly found. While a pocket book for deep space was purposefully written by a lecturer a website of astronomy for Thais was planned by the cooperation of two computer programmers. An obseravatory with 600-mm reflector was the first attempt by a Thai engineer. The product of the first 150-mm reflector Dosonian made in Thailand is sold in low price. Future optical programs are now being planned to be made by Thais. These people have recently worked together to develope astronomy in Thailand.
The role of tethers on space station
NASA Technical Reports Server (NTRS)
Vontiesenhausen, G. (Editor)
1985-01-01
The results of research and development that addressed the usefulness of tether applications in space, particularly for space station are described. A well organized and structured effort of considerable magnitude involving NASA, industry and academia have defined the engineering and technological requirements of space tethers and their broad range of economic and operational benefits. The work directed by seven NASA Field Centers is consolidated and structured to cover the general and specific roles of tethers in space as they apply to NASA's planned space station. This is followed by a description of tether systems and operations. A summary of NASA's plans for tether applications in space for years to come is given.
MSFC personnel management tasks: Recruitment and orientation of new employees
NASA Technical Reports Server (NTRS)
Brindley, T. A.
1980-01-01
In order to encourage highly motivated young students to learn about NASA and consider it for a career, a formal program is to be initiated whereby selected students can work on a voluntary basis at Marshall Space Flight Center (MSFC). The first task was to develop the working plan and procedures for this program, called Student Volunteer Service Program, in the writing of MSFC official guidelines, the Marshall Management Instruction (the MMI) which is a binding document that defines policy and establishes procedures and guidelines. Particular considerations written into the MMI after numerous consultations, interviews, and discussions about a satisfactory policy, include: arrangements to be made between the student, the school authorities, and concerned MSFC employees; management of the work assignments; and procedures for the student's welfare and safety. The second task was the development of a recruitment brochure for the attraction of new employees, especially scientists and engineers. The third task assigned was to develop a plan called Orientation of New Employees.
Petrobras will increase its water injection in Bahia state (in Spanish)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1967-08-01
A plan for modernizing and expanding existing water- injection facilities for the Bahia fields is planned by Petrobras, the Brazilian oil monoply. The plan contemplates continued use of most of the original equipment. The plan will be expanded wih a pilot plant treatment of the Don Juan field brine, and the injection plant. The following engineering works will be started: (1) a pumping station which takes 110,000 bpd of water from the sea, (2) a water pipe line 80 k long; (3) a system for the collection of oil field brine; (4) 3 combination water treating plants; (5) 3 highmore » pressure injection pump stations; (6) a system for the distribution of the injection water; and (7) a pilot plant for treating well water. For water injection, it will be possible to use individually, seawater, well water, and brine produced with the oil.« less
Webcasts promote in-class active participation and learning in an engineering elective course
NASA Astrophysics Data System (ADS)
Freguia, Stefano
2017-09-01
This paper describes the design and outcomes of an educational intervention undertaken to improve the quality of delivery of a fourth-year engineering elective course - Industrial Wastewater and Solid Waste Management at the University of Queensland. The objective was to increase the level of active participation of students in planned active-learning classroom activities, including whole-class discussions and small group project-type work. According to a flipped classroom model, new online material in the form of webcasts was proposed to students before class. Students reacted very positively to the webcasts: the percentage of students viewing the webcast before planned workshop sessions ranged between 80% and 92% over the five weeks of the intervention. Enhanced engagement led also to increased attendance (85-92% at workshop sessions), and remarkable active participation in class (half of observed teams were ∼80% active). Remarkably, team performance as quantified by their report marks linearly correlated with the level of active participation in class.
NASA Astrophysics Data System (ADS)
Allred, B. W.; Naugle, D.; Donnelly, P.; Tack, J.; Jones, M. O.
2016-12-01
In 2010, the USDA Natural Resources Conservation Service (NRCS) launched the Sage Grouse Initiative (SGI) to voluntarily reduce threats facing sage-grouse and rangelands on private lands. Over the past five years, SGI has matured into a primary catalyst for rangeland and wildlife conservation across the North American west, focusing on the shared vision of wildlife conservation through sustainable working landscapes and providing win-win solutions for producers, sage grouse, and 350 other sagebrush obligate species. SGI and its partners have invested a total of $750 million into rangeland and wildlife conservation. Moving forward, SGI continues to focus on rangeland conservation. Partnering with Google Earth Engine, SGI has developed outcome monitoring and conservation planning tools at continental scales. The SGI science team is currently developing assessment and monitoring algorithms of key conservation indicators. The SGI web application utilizes Google Earth Engine for user defined analysis and planning, putting the appropriate information directly into the hands of managers and conservationists.
Deng, Peter; Torrest, Audrey; Pollock, Kari; Dahlenburg, Heather; Annett, Geralyn; Nolta, Jan A.; Fink, Kyle D.
2016-01-01
Progress to date from our group and others indicate that using genetically-engineered mesenchymal stem cells (MSC) to secrete brain-derived neurotrophic factor (BDNF) supports our plan to submit an Investigational New Drug application to the Food and Drug Administration for the future planned Phase 1 safety and tolerability trial of MSC/BDNF in patients with Huntington's disease (HD). There are also potential applications of this approach beyond HD. Our biological delivery system for BDNF sets the precedent for adult stem cell therapy in the brain and could potentially be modified for other neurodegenerative disorders such as amyotrophic lateral sclerosis (ALS), spinocerebellar ataxia (SCA), Alzheimer's disease, and some forms of Parkinson's disease. The MSC/BDNF product could also be considered for studies of regeneration in traumatic brain injury, spinal cord and peripheral nerve injury. This work also provides a platform for our future gene editing studies, since we will again use MSCs to deliver the needed molecules into the central nervous system. PMID:27335539
A WEB based approach in biomedical engineering design education.
Enderle, J D; Browne, A F; Hallowell, M B
1997-01-01
As part of the accreditation process for university engineering programs, students are required to complete a minimum number of design credits in their course of study, typically at the senior level. Many call this the capstone course. Engineering design is a course or series of courses that bring together concepts and principles that students learn in their field of study--it involves the integration and extension of material learned in their major toward a specific project. Most often, the student is exposed to system-wide analysis, critique and evaluation for the first time. Design is an iterative, decision making process in which the student optimally applies previously learned material to meet a stated objective. At the University of Connecticut, students work in teams of 3-4 members and work on externally sponsored projects. To facilitate working with sponsors, a WEB based approach is used for reporting the progress on projects. Students are responsible for creating their own WEB sites that support both html and pdf formats. Students provide the following deliverables: weekly progress reports, project statement, specifications, project proposal, interim report, and final report. A senior design homepage also provides links to data books and other resources for use by students. We are also planning distance learning experiences between two campuses so students can work on projects that involve the use of video conferencing.
Development of a Work Control System for Propulsion Testing at NASA Stennis
NASA Technical Reports Server (NTRS)
Messer, Elizabeth A.
2005-01-01
In 1996 Stennis Space Center was given management authority for all Propulsion Testing for NASA. Over the next few years several research and development (R&D) test facilities were completed and brought up to full operation in what is known as the E-Complex Test Facility at Stennis Space Center. To construct, activate and operate these test facilities, a manual paper-based work control system was created. After utilizing this paper-based work control system for approximately three years, it became apparent that the research and development test area needed a better method to execute, monitor, and report on tasks required to further propulsion testing. The paper based system did not provide the engineers adequate visibility into work tasks or the tracking of testing or hardware discrepancies. This system also restricted the engineer s ability to utilize and access past knowledge and experiences given the severe schedule limitations for most R&D propulsion testing projects. Therefore a system was developed to meet the growing need of Test Operations called the Propulsion Test Directorate (PTD) Work Control System. This system is used to plan, perform, and track tasks that support testing and also to capture lessons learned while doing so.
Understanding the Changing Dynamics of the Gender Gap in Undergraduate Engineering Majors: 1971-2011
ERIC Educational Resources Information Center
Sax, Linda J.; Kanny, M. Allison; Jacobs, Jerry A.; Whang, Hannah; Weintraub, Dayna S.; Hroch, Amber
2016-01-01
In this paper we examine the level and determinants of entering college students' plans to major in engineering. While the overall level of interest in engineering has fluctuated between 1971 and 2011, a very large gender gap in freshman interest remains. We find that the percent of first-year women who plan to major in engineering is roughly the…
Predictive Engineering Implementation at KSC
NASA Technical Reports Server (NTRS)
Mosconi, Jane; Schafer, Loraine
1995-01-01
This paper provides an overview of what the primary contractors at Kennedy Space Center (KSC) are doing in the field of predictive engineering. The technologies employed by each of the contractors and the cost savings associated with the implementation of these predictive engineering methods are discussed. The sources include predictive engineering implementation plans, published by each of the contractors and interviews with the authors of these implementation plans.
Inorganic Composite Materials in Japan: Status and Trends
1989-11-01
is planned with have already done some preliminary work) more sayby engineers and scientists and less on titanium and aluminide matrix compos- by...structural reliability of continued research in elevated tempera- the components. ture fiber and ceramic matrix composites. F=aMoving Blade (FRP...Forming Kawasaki 11eavy Ind with regard to these program target goals ONRFE M7 6 for carbon (CF), SiC, and boron filaments in isotropic titanium
Cradle Enhanced UI Development
NASA Technical Reports Server (NTRS)
Jentsch, Samuel
2016-01-01
This summer I have been working in the EDI (Exploration, Development, and Integration) office. The primary goal of my office is to facilitate the integration, cooperation, and communication between programs, projects and departments throughout the agency. The majority of my efforts has been focused on Cradle, a requirements management and systems engineering tool. This tool is utilized by teams throughout NASA to plan and track the development of a variety of ongoing projects.
The interplay of biology and technology
Fields, Stanley
2001-01-01
Technologies for biological research arise in multiple ways—through serendipity, through inspired insights, and through incremental advances—and they are tightly coupled to progress in engineering. Underlying the complex dynamics of technology and biology are the different motivations of those who work in the two realms. Consideration of how methodologies emerge has implications for the planning of interdisciplinary centers and the training of the next generation of scientists. PMID:11517346
JPRS Report, Science & Technology, USSR: Engineering & Equipment
1989-01-30
flux density and of the speed and density of the mass flux, have a long operating life , and are economical. A technology has been developed for...water pro- vides a repair-free service life of 20 to 30 years. JPRS-ueq-89-002 30 January 1989 Industrial Technology, Planning, Productivity...to raise the temperature of the working body, increase its efficiency, and reduce fuel consumption. Ceramic cutting plates permit a two- to
Combining Architecture-Centric Engineering with the Team Software Process
2010-12-01
colleagues from Quarksoft and CIMAT have re- cently reported on their experiences in “Introducing Software Architecture Development Methods into a TSP...Postmortem Lessons, new goals, new requirements, new risk , etc. Business and technical goals Estimates, plans, process, commitment Work products...architecture to mitigate the risks unco- vered by the ATAM. At the end of the iteration, version 1.0 of the architec- ture is available. Implement a second
Plow Shop Pond Supplemental Investigation Work Plan
1994-09-01
the results of the TIE, major contributors to sediment toxicity in Plow I Shop will be identified. Site-specific numerical criteria for contaminants in...consume Plow Shop Pond fish is less than 1.3". ABB-ES would use an available software package to generate the probability distributions. 5 If...Fort Devens project. The Project Manager is responsible for confirming the appropriateness and adequacy of the technical or engineering services
2015-09-01
planning, awarding, and administering maintenance dredging contracts with industry . 8For more information on hopper dredging, see GAO, Army Corps of...miles of waterways and hundreds of ports of harbors. The Corps conducts maintenance dredging primarily under contract with private industry to...headquarters, divisions, and districts (selected for geographic variation and range of dredging work) and dredging industry stakeholders. What
1992-08-01
recommend that representatives of the WES Concrete Technology Division be onsite during the placement and postplacement phases to offer technical...written before field placement. PREFACE The work described in this report is part of an ongoing research effort accomplished in the Concrete Technology ... Division (CTD), Structures Laboratory (SL), U.S. Army Engineer Waterways Experiment Station (WES), under Interagency Agreement from the Department of
NEEMO 21: Tools, Techniques, Technologies and Training for Science Exploration
NASA Technical Reports Server (NTRS)
Graff, T.; Young, K.; Coan, D.; Merselis, D.; Bellantuono, A.; Dougan, K.; Rodriguez-Lanetty, M.; Nedimyer, K.; Chappell, S.; Beaton, K.;
2017-01-01
The 21st mission of the National Aeronautics and Space Administration (NASA) Extreme Environment Mission Operations (NEEMO) was a highly integrated operational field test and evaluation of tools, techniques, technologies, and training for science driven exploration during extravehicular activity (EVA). The mission was conducted in July 2016 from the Aquarius habitat, an underwater laboratory, off the coast of Key Largo in the Florida Keys National Marine Sanctuary. An international crew of eight (comprised of NASA and ESA astronauts, engineers, medical personnel, and habitat technicians) lived and worked in and around Aquarius and its surrounding reef environment for 16 days. The integrated testing (both interior and exterior objectives) conducted from this unique facility continues to support current and future human space exploration endeavors. Expanding on the scientific and operational evaluations conducted during NEEMO 20, the 21st NEEMO mission further incorporated a diverse Science Team comprised of planetary geoscientists from the Astromaterials Research and Exploration Science (ARES/XI) Division from the Johnson Space Center, marine scientists from the Department of Biological Sciences at Florida International University (FIU) Integrative Marine Genomics and Symbiosis (IMaGeS) Lab, and conservationists from the Coral Restoration Foundation. The Science Team worked in close coordination with the long-standing EVA operations, planning, engineering, and research components of NEEMO in all aspects of mission planning, development, and execution.
Space Transportation Booster Engine (STBE) configuration study
NASA Technical Reports Server (NTRS)
1986-01-01
The overall objective of this Space Transportation Booster Engine (STBE) study is to identify candidate engine configurations which enhance vehicle performance and provide operational flexibility at low cost. The specific objectives are as follows: (1) to identify and evaluate candidate LOX/HC engine configurations for the Advanced Space Transportation System for an early 1995 IOC and a late 2000 IOC; (2) to select one optimum engine for each time period; 3) to prepare a conceptual design for each configuration; (4) to develop a technology plan for the 2000 IOC engine; and, (5) to prepare preliminary programmatic planning and analysis for the 1995 IOC engine.
Second floor plan. (Also includes a roof plan and finish ...
Second floor plan. (Also includes a roof plan and finish schedule.) March Air Force Base, Riverside, California, Combat Operations Center, Combat Operations Building. By Moffatt and Nichol, Engineers, 122 West Fifth Street, Long Beach, California; for the Corps of Engineers, U.S. Army, Office of the District Engineer, Los Angeles, California. Drawing no. AW-60-02-03, sheet no. 13, approved March, 1962; specifications no. OCI-62-66; D.O. series AW 1596/13, Rev. "C"; file drawer 1290. Last revised 7 February 1984. Roof plan scale one-sixteenth inch to one foot; second floor plan scale one-eighth inch to one foot. 28.75x41 inches. pencil on paper - March Air Force Base, Strategic Air Command, Combat Operations Center, 5220 Riverside Drive, Moreno Valley, Riverside County, CA
Home-based radiology transcription and a productivity pay plan.
Kerr, K
1997-01-01
Shands Hospital in Gainesville, Fla., decided to evaluate the way it provided transcription services in its radiology department. It identified four goals: increased productivity, decreased operating expense, finding much needed space in the radiology department and increasing employee morale. The department performs 165,000 procedures annually, with 66 radiologists, 29 faculty, and 37 residents and fellows on staff. Six FTEs comprised the transcription pool in the radiology department, with transcription their only duty. Transcriptionists were paid an hourly rate based on their years of service, not their productivity. Evaluation and measurement studies were undertaken by the hospital's management systems engineering department. The transcriptionists' hours were then changed to provide coverage during the periods of heaviest dictation. The productivity level of the transcription staff was also measured and various methods of measurement reviewed. The goal was a pure incentive pay plan that would reward employees for every increase in productivity. The incentive pay plan was phased in over a three-month period. Transcriptionists were paid for work performed, with no base pay beyond minimum wage. The move to home-based transcription was planned. The necessary equipment was identified and various issues specific to working at home were addressed. Approximately six months later, the transcriptionists were set up to work at home. The astounding results achieved are presented: 28% increase in productivity, operational cost savings exceeding $25,000 and a space savings of 238 square feet.
Personal Study Planning in Doctoral Education in Industrial Engineering
ERIC Educational Resources Information Center
Lahenius, K.; Martinsuo, M.
2010-01-01
The duration of doctoral studies has increased in Europe. Personal study planning has been considered as one possible solution to help students in achieving shorter study times. This study investigates how doctoral students experience and use personal study plans in one university department of industrial engineering. The research material…
Inspection planning development: An evolutionary approach using reliability engineering as a tool
NASA Technical Reports Server (NTRS)
Graf, David A.; Huang, Zhaofeng
1994-01-01
This paper proposes an evolutionary approach for inspection planning which introduces various reliability engineering tools into the process and assess system trade-offs among reliability, engineering requirement, manufacturing capability and inspection cost to establish an optimal inspection plan. The examples presented in the paper illustrate some advantages and benefits of the new approach. Through the analysis, reliability and engineering impacts due to manufacturing process capability and inspection uncertainty are clearly understood; the most cost effective and efficient inspection plan can be established and associated risks are well controlled; some inspection reductions and relaxations are well justified; and design feedbacks and changes may be initiated from the analysis conclusion to further enhance reliability and reduce cost. The approach is particularly promising as global competitions and customer quality improvement expectations are rapidly increasing.
LOW-ENGINE-FRICTION TECHNOLOGY FOR ADVANCED NATURAL-GAS RECIPROCATING ENGINES
DOE Office of Scientific and Technical Information (OSTI.GOV)
Victor W. Wong; Tian Tian; Grant Smedley
2003-08-28
This program aims at improving the efficiency of advanced natural-gas reciprocating engines (ANGRE) by reducing piston/ring assembly friction without major adverse effects on engine performance, such as increased oil consumption and emissions. A detailed set of piston/ring dynamic and friction models have been developed and applied that illustrated the fundamental relationships between design parameters and friction losses. Various low-friction strategies and concepts have been explored, and engine experiments will validate these concepts. An iterative process of experimentation, simulation and analysis, will be followed with the goal of demonstrating a complete optimized low-friction engine system. As planned, MIT has developed guidelinesmore » for an initial set of low-friction piston-ring-pack designs. Current recommendations focus on subtle top-piston-ring and oil-control-ring characteristics. A full-scale Waukesha F18 engine has been installed at Colorado State University and testing of the baseline configuration is in progress. Components for the first design iteration are being procured. Subsequent work includes examining the friction and engine performance data and extending the analyses to other areas to evaluate opportunities for further friction improvement and the impact on oil consumption/emission and wear, towards demonstrating an optimized reduced-friction engine system.« less
NASA Technical Reports Server (NTRS)
Henderson, A. J., Jr.
2001-01-01
FIRST is the acronym of For Inspiration and Recognition of Science and Technology. FIRST is a 501.C.3 non-profit organization whose mission is to generate an interest in science and engineering among today's young adults and youth. This mission is accomplished through a robot competition held annually in the spring of each year. NASAs Marshall Space Flight Center, Education Programs Department, awarded a grant to Lee High School, the sole engineering magnet school in Huntsville, Alabama. MSFC awarded the grant in hopes of fulfilling its goal of giving back invaluable resources to its community and engineers, as well as educating tomorrow's work force in the high-tech area of science and technology. Marshall engineers, Lee High School students and teachers, and a host of other volunteers and parents officially initiated this robot design process and competitive strategic game plan. The FIRST Robotics Competition is a national engineering contest, which immerses high school students in the exciting world of science and engineering. Teaming with engineers from government agencies, businesses, and universities enables the students to learn about the engineering profession. The students and engineers have six weeks to work together to brainstorm, design, procure, construct, and test their robot. The team then competes in a spirited, 'no-holds barred' tournament, complete with referees, other FIRST-designed robots, cheerleaders, and time clocks. The partnerships developed between schools, government agencies, businesses, and universities provide an exchange of resources and talent that build cooperation and expose students to new and rewarding career options. The result is a fun, exciting, and stimulating environment in which all participants discover the important connections between classroom experiences and real-world applications. This paper will highlight the story, engineering development, and evolutionary design of Xtraktor, the rookie robot, a manufacturing marvel and engineering achievement.
IDC Re-Engineering Phase 3 Development Plan.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Harris, James M.; Burns, John F.; Pollock, David L.
2017-01-01
Sandia National Laboratories has prepared a project development plan that proposes how the parties interested in the IDC Re-Engineering system will coordinate its development, testing and transition to operations.
Photocopy of plan (in U.S. Army office of Army Engineers ...
Photocopy of plan (in U.S. Army office of Army Engineers plans and drawings, Fort Hancock and Sandy hook proving ground, record group 7, drawer 44, Cartographic and Architectural branc, The National Archives, Washington, DC) Gillespie, G.L., map of a portion of Sandy Hook, NJ showing condition of beach in vicinity of dynamite gun emplacements, 1894 Engineer's wharf - U.S. Coast Guard Sandy Hook Station, Western Docking Structure, West of intersection of Canfield Road & Hartshorne Drive, Highlands, Monmouth County, NJ
Photocopy of plan (in U.S. Army office of Army Engineers ...
Photocopy of plan (in U.S. Army office of Army Engineers plans and drawings, Fort Hancock and Sandy hook proving ground, record group 7, drawer 44, Cartographic and Architectural branc, The National Archives, Washington, DC) from Talcott, T.M.R., plot of a survey of site, Fort at Sandy Hook, NJ, 1859-1860 Detail of engineer's wharf - U.S. Coast Guard Sandy Hook Station, Western Docking Structure, West of intersection of Canfield Road & Hartshorne Drive, Highlands, Monmouth County, NJ
Photocopy of plan (in U.S. Army office of Army Engineers ...
Photocopy of plan (in U.S. Army office of Army Engineers plans and drawings, Fort Hancock and Sandy hook proving ground, record group 7, drawer 44, Cartographic and Architectural branc, The National Archives, Washington, DC), cartographer unknown, title unknown, March 28, 1892 1890 lifesaving station shown near fort and beach, no boathouse near engineer's wharf - U.S. Coast Guard Sandy Hook Station, Western Docking Structure, West of intersection of Canfield Road & Hartshorne Drive, Highlands, Monmouth County, NJ
78 FR 46532 - Airworthiness Directives; the Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-01
... capability on one engine, and in-flight shutdown of the engine. This action revises that NPRM by proposing to... maintenance planning data (MPD) document, and to remove airplanes from the applicability. We are proposing... Planning Data (MPD) Document. Among other things, Section 9 describes AWL No. 28-AWL-101, Engine Fuel...
Space Transportation Propulsion Systems
NASA Technical Reports Server (NTRS)
Liou, Meng-Sing; Stewart, Mark E.; Suresh, Ambady; Owen, A. Karl
2001-01-01
This report outlines the Space Transportation Propulsion Systems for the NPSS (Numerical Propulsion System Simulation) program. Topics include: 1) a review of Engine/Inlet Coupling Work; 2) Background/Organization of Space Transportation Initiative; 3) Synergy between High Performance Computing and Communications Program (HPCCP) and Advanced Space Transportation Program (ASTP); 4) Status of Space Transportation Effort, including planned deliverables for FY01-FY06, FY00 accomplishments (HPCCP Funded) and FY01 Major Milestones (HPCCP and ASTP); and 5) a review current technical efforts, including a review of the Rocket-Based Combined-Cycle (RBCC), Scope of Work, RBCC Concept Aerodynamic Analysis and RBCC Concept Multidisciplinary Analysis.
Research Laboratory for Engineering and Tehnology (ReLEnT)-Summer Program
NASA Technical Reports Server (NTRS)
Okhio, Cyril B.
1996-01-01
During the fiscal years 1994-1995 students at Central State University (CSU) have worked diligently under the supervision of the PI and associates to plan, design and conduct a four-week hands on summer program for high school students in grades 9 to 12. These workshops consists of experiments and computer aided design and manufacturing, designed to constructively stimulate interests in engineering and technology, and promote enrollment at CSU after they matriculate from high school. The experience gained in two years will be utilized to realize one of the deliverables for CSU engineering program during 1996. In FY-96 a new total of 30 students are now being interviewed for the 1996 program. This grant also provides resource for students enrolled in CSU's engineering program to work as undergraduate research assistants and ReLEnT tuition scholarship awards. These students are involved in the development of research, design projects, workshop procedures, laboratory exercises and seminars. Undergraduate students receiving tuition scholarships are required to maintain a cumulative grade point average of 3.0 or higher. Finally, the ReLEnT award has made it possible for CSU to acquire some experimental and CFD capability which now provides us with the opportunity to compete and respond to RFP's on a competitive basis and a timely manner.
High Level Rule Modeling Language for Airline Crew Pairing
NASA Astrophysics Data System (ADS)
Mutlu, Erdal; Birbil, Ş. Ilker; Bülbül, Kerem; Yenigün, Hüsnü
2011-09-01
The crew pairing problem is an airline optimization problem where a set of least costly pairings (consecutive flights to be flown by a single crew) that covers every flight in a given flight network is sought. A pairing is defined by using a very complex set of feasibility rules imposed by international and national regulatory agencies, and also by the airline itself. The cost of a pairing is also defined by using complicated rules. When an optimization engine generates a sequence of flights from a given flight network, it has to check all these feasibility rules to ensure whether the sequence forms a valid pairing. Likewise, the engine needs to calculate the cost of the pairing by using certain rules. However, the rules used for checking the feasibility and calculating the costs are usually not static. Furthermore, the airline companies carry out what-if-type analyses through testing several alternate scenarios in each planning period. Therefore, embedding the implementation of feasibility checking and cost calculation rules into the source code of the optimization engine is not a practical approach. In this work, a high level language called ARUS is introduced for describing the feasibility and cost calculation rules. A compiler for ARUS is also implemented in this work to generate a dynamic link library to be used by crew pairing optimization engines.
NASA Astrophysics Data System (ADS)
Sanchez-Lavega, Agustin; Ordoñez-Etxebarria, Iñaki; del Rio-Gaztelurrutia, Teresa
2014-11-01
We show in this communication how it is possible to deduce the radius of the orbits of Galilean satellites around Jupiter using a small number of well-planned observations. This allows the instructor to propose a complete student activity that involves planning an observation, the observation itself, processing and analyzing the images and deduction of relevant magnitudes [1]. This work was performed in the Aula EspaZio Gela under the Master in Space Science and Technology [2].References[1] I. Ordoñez-Etxebarria, T. del Río Gaztelurrutia and A. Sánchez Lavega, European Journal of Physics, Eur. J. Phys., 35, 045020 (14pp), (2014)[2] A. Sánchez-Lavega et al., European Journal of Engineering Education, doi:10.1080/03043797.2013.788611 (2013)AcknowledgementsThis work was supported by a grant from Diputaciõn Foral de Bizkaia — Bizkaiko Foru Aldundia to the Aula Espazio Gela.
Model-Based Systems Engineering Pilot Program at NASA Langley
NASA Technical Reports Server (NTRS)
Vipavetz, Kevin G.; Murphy, Douglas G.; Infeld, Samatha I.
2012-01-01
NASA Langley Research Center conducted a pilot program to evaluate the benefits of using a Model-Based Systems Engineering (MBSE) approach during the early phase of the Materials International Space Station Experiment-X (MISSE-X) project. The goal of the pilot was to leverage MBSE tools and methods, including the Systems Modeling Language (SysML), to understand the net gain of utilizing this approach on a moderate size flight project. The System Requirements Review (SRR) success criteria were used to guide the work products desired from the pilot. This paper discusses the pilot project implementation, provides SysML model examples, identifies lessons learned, and describes plans for further use on MBSE on MISSE-X.
NASA's Space Launch System: Systems Engineering Approach for Affordability and Mission Success
NASA Technical Reports Server (NTRS)
Hutt, John J.; Whitehead, Josh; Hanson, John
2017-01-01
NASA is working toward the first launch of the Space Launch System, a new, unmatched capability for deep space exploration with launch readiness planned for 2019. Since program start in 2011, SLS has passed several major formal design milestones, and every major element of the vehicle has produced test and flight hardware. The SLS approach to systems engineering has been key to the program's success. Key aspects of the SLS SE&I approach include: 1) minimizing the number of requirements, 2) elimination of explicit verification requirements, 3) use of certified models of subsystem capability in lieu of requirements when appropriate and 4) certification of capability beyond minimum required capability.
Communication and Shared Practices are Bringing NASA STEM Resources to Camp Youth
NASA Astrophysics Data System (ADS)
LaConte, K.; Shaner, A.; Shipp, S.; Garst, B.; Bialeschki, M. D.; Netting, R.; Erickson, K.
2015-11-01
In 2012, NASA and the American Camp Association (ACA) entered into an alliance to further both organizations' goals and objectives with regard to science, technology, engineering, and mathematics (STEM) education. This alliance is providing camp staff—and their young audiences—access to NASA's resources. NASA disseminates resources (e.g., pathways for requesting guest presenters, informal learning lesson plans), conducts ACA professional development (online and at ACA conferences), and coordinates efforts around key events (e.g., spacecraft launches). ACA promotes awareness of NASA resources through their communications and services. Together, the organizations are working to inspire a new generation of scientists, engineers, explorers, educators, and innovators to pursue STEM careers.
The Iterative Design Process in Research and Development: A Work Experience Paper
NASA Technical Reports Server (NTRS)
Sullivan, George F. III
2013-01-01
The iterative design process is one of many strategies used in new product development. Top-down development strategies, like waterfall development, place a heavy emphasis on planning and simulation. The iterative process, on the other hand, is better suited to the management of small to medium scale projects. Over the past four months, I have worked with engineers at Johnson Space Center on a multitude of electronics projects. By describing the work I have done these last few months, analyzing the factors that have driven design decisions, and examining the testing and verification process, I will demonstrate that iterative design is the obvious choice for research and development projects.
The Incremental Launching Method for Educational Virtual Model
NASA Astrophysics Data System (ADS)
Martins, Octávio; Sampaio, A. Z.
This paper describes the application of virtual reality technology to the development of an educational model related to the construction of a bridge. The model allow the visualization of the physical progression of the work following a planned construction sequence, the observation of details of the form of every component of the works and carry the study of the type and method of operation of the equipment applied in the construction. The model admit interaction and then some degree of collaboration between students and teachers in the analyses of aspects concerning geometric forms, working methodology or other technical issues observed using the application. The model presents distinct advantage as educational aids in first-degree courses in Civil Engineering.
First Scientific Working Group Meeting of Airborne Doppler Lidar Wind Velocity Measurement Program
NASA Technical Reports Server (NTRS)
Kaufman, J. W. (Editor)
1980-01-01
The purpose of the first scientific working group meeting was fourfold: (1) to identify flight test options for engineering verification of the MSFC Doppler Lidar; (2) to identify flight test options for gathering data for scientific/technology applications; (3) to identify additional support equipment needed on the CV 990 aircraft for the flight tests; and (4) to identify postflight data processing and data sets requirements. The working group identified approximately ten flight options for gathering data on atmospheric dynamics processes, including turbulence, valley breezes, and thunderstorm cloud anvil and cold air outflow dynamics. These test options will be used as a basis for planning the fiscal year 1981 tests of the Doppler Lidar system.
Organization Readiness and ERP Implementation in Albaha University
NASA Astrophysics Data System (ADS)
Alaqeel, K.; Shakkah, M. S.; Rahmat, R. F.; Alfageeh, A.; Budiarto, R.
2017-04-01
This work studies the correlation between the organizational readiness in Albaha University and the respective Critical Success Factors with regards to the Enterprise Resource Planning (ERP) implementation. The study also considers some suggestions to improve the ABU’s ERP systems and roadmap towards the self -development strategy and to reduce vendor-dependency. A survey regarding ERP to the end-users, experts and developers in Albaha University was conducted. The analysis of the results in this work confirmed with the results of an existing work. The four significance success factors: Project Management, Business Process Re-engineering, System Integration, and Training and Education are recommended to be adopted to assure the smooth adoption of ERP at Albaha University.
ERIC Educational Resources Information Center
Ugwu, Dorothy N.; Adamuti-Trache, Maria
2017-01-01
This study examines the post-graduation plans of international science and engineering doctoral students at a public research-intensive university, and the extent to which graduate school experiences influence post-graduation plans. The study is grounded in Tinto's Integration Model as well as Berry's Acculturation Model. Study findings highlight…
14 CFR 151.113 - Advance planning proposals: Sponsor eligibility.
Code of Federal Regulations, 2012 CFR
2012-01-01
... Engineering Proposals § 151.113 Advance planning proposals: Sponsor eligibility. The sponsor of an advance planning and engineering proposal must be a public agency, as defined in § 151.37(a), and must be legally... agreement; (c) Provide enough funds to pay all estimated proposal costs not borne by the United States; and...
14 CFR 151.113 - Advance planning proposals: Sponsor eligibility.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Engineering Proposals § 151.113 Advance planning proposals: Sponsor eligibility. The sponsor of an advance planning and engineering proposal must be a public agency, as defined in § 151.37(a), and must be legally... agreement; (c) Provide enough funds to pay all estimated proposal costs not borne by the United States; and...
25. PHOTOCOPY OF PLAN DRAWING. Quartermaster Research and Development Laboratory, ...
25. PHOTOCOPY OF PLAN DRAWING. Quartermaster Research and Development Laboratory, Natick, Mass. Climatic Building, First Floor Plan, Refrigeration and Engineering. Drawing No. 35-07-01, Sheet 52 of 72, 1952. (Source: NRDEC). - Natick Research & Development Laboratories, Climatic Chambers Building, U.S. Army Natick Research, Development & Engineering Center (NRDEC), Natick, Middlesex County, MA
NASA Technical Reports Server (NTRS)
Johnson, David W.
1991-01-01
The purpose was to study how manpower and projects are planned at the Facilities Engineering Division (FENGD) within the Systems Engineering and Operations Directorate of the LaRC and to make recommendations for improving the effectiveness and productivity ot the tools that are used. The existing manpower and project planning processes (including the management plan for the FENGD, existing manpower planning reports, project reporting to LaRC and NASA Headquarters, employee time reporting, financial reporting, and coordination/tracking reports for procurement) were discussed with several people, and project planning software was evaluated.
NASA Technical Reports Server (NTRS)
Allan, R. D.
1978-01-01
The Definition Study of a Variable Cycle Experimental Engine (VCEE) and Associated Test Program and Test Plan, was initiated to identify the most cost effective program for a follow-on to the AST Test Bed Program. The VCEE Study defined various subscale VCE's based on different available core engine components, and a full scale VCEE utilizing current technology. The cycles were selected, preliminary design accomplished and program plans and engineering costs developed for several program options. In addition to the VCEE program plans and options, a limited effort was applied to identifying programs that could logically be accomplished on the AST Test Bed Program VCE to extend the usefulness of this test hardware. Component programs were provided that could be accomplished prior to the start of a VCEE program.
7. This photographic copy of an engineering drawing displays the ...
7. This photographic copy of an engineering drawing displays the building's floor plan in its 1995 arrangement, with rooms designated. California Institute of Technology, Jet Propulsion Laboratory, Facilities Engineering and Construction Office, "Addition to Weigh & Control Bldg. E-35, Demolition, Floor and Roof Plans," drawing no. E35/3-0, October 5, 1983. California Institute of Technology, Jet Propulsion Laboratory, Plant Engineering: engineering drawings of structures at JPL Edwards Facility. Drawings on file at JPL Plant Engineering, Pasadena, California. - Jet Propulsion Laboratory Edwards Facility, Weigh & Control Building, Edwards Air Force Base, Boron, Kern County, CA
4. This photographic copy of an engineering drawing shows the ...
4. This photographic copy of an engineering drawing shows the plan and details for Test Stand "G" and the placement of the vibrator. California Institute of Technology, Jet Propulsion Laboratory, Plant Engineering: "Vibration Test Facility-Bldg E-72, Floor & Roof Plans, Sections, Details & Door Schedule," drawing no. E72/2-5, 21 May 1964. California Institute of Technology, Jet Propulsion Laboratory, Plant Engineering: engineering drawings of structures at JPL Edwards Facility. Drawings on file at JPL Plant Engineering, Pasadena, California. - Jet Propulsion Laboratory Edwards Facility, Test Stand G, Edwards Air Force Base, Boron, Kern County, CA
SAFETY ON UNTRUSTED NETWORK DEVICES (SOUND)
2017-10-10
in the Cyber & Communication Technologies Group , but not on the SOUND project, would review the code, design and perform attacks against a live...3.5 Red Team As part of our testing , we planned to conduct Red Team assessments. In these assessments, a group of engineers from BAE who worked...developed under the DARPA CRASH program and SOUND were designed to be companion projects. SAFE focused on the processor and the host, SOUND focused on
Missouri River Recovery Management Plan and Environmental Impact Statement
2014-04-11
Proficient in hydrologic and hydraulic engineering computer models, particularly ResSim and HEC - RAS ; working experience with large river systems including...to help study teams determine ecosystem responses to changes in the flow regime of a river or connected wetland. HEC -EFM analyses involve: 1...Description of the Model and How It Will Be Applied in the Study Approval Status HEC - RAS The function of this model is to conduct one-dimensional hydraulic
DOE Office of Scientific and Technical Information (OSTI.GOV)
James S. Tulenko; Carl D. Crane III
The University Research Program in Robotics (URPR) Implementation Plan is an integrated group of universities performing fundamental research that addresses broad-based robotics and automation needs of the NNSA Directed Stockpile Work (DSW) and Campaigns. The URPR mission is to provide improved capabilities of robotics science and engineering to meet the future needs of all weapon systems and other associated NNSA/DOE activities.
CrossTalk. The Journal of Defense Software Engineering. Volume 23, Number 6, Nov/Dec 2010
2010-11-01
Model of archi- tectural design. It guides developers to apply effort to their software architecture commensurate with the risks faced by...Driven Model is the promotion of risk to prominence. It is possible to apply the Risk-Driven Model to essentially any software development process...succeed without any planned architecture work, while many high-risk projects would fail without it . The Risk-Driven Model walks a middle path
Avionics Simulation, Development and Software Engineering
NASA Technical Reports Server (NTRS)
2002-01-01
During this reporting period, all technical responsibilities were accomplished as planned. A close working relationship was maintained with personnel of the MSFC Avionics Department Software Group (ED14), the MSFC EXPRESS Project Office (FD31), and the Huntsville Boeing Company. Accomplishments included: performing special tasks; supporting Software Review Board (SRB), Avionics Test Bed (ATB), and EXPRESS Software Control Panel (ESCP) activities; participating in technical meetings; and coordinating issues between the Boeing Company and the MSFC Project Office.
Navy Ford (CVN-78) Class Aircraft Carrier Program: Background and Issues for Congress
2016-03-08
limited. Yet, it is not too late to examine the carrier’s acquisition history to illustrate the dynamics of shipbuilding—and weapon system—acquisition...rates and the investments needed by the shipbuilder to achieve these efficiencies.31 Later in the hearing, Stackley testified that the history in...for all work packages in accordance with the integrated master schedule; zero delinquent engineering and planning products; resolution of
Key Future Engineering Capabilities for Human Capital Retention
NASA Astrophysics Data System (ADS)
Sivich, Lorrie
Projected record retirements of Baby Boomer generation engineers have been predicted to result in significant losses of mission-critical knowledge in space, national security, and future scientific ventures vital to high-technology corporations. No comprehensive review or analysis of engineering capabilities has been performed to identify threats related to the specific loss of mission-critical knowledge posed by the increasing retirement of tenured engineers. Archival data from a single diversified Fortune 500 aerospace manufacturing engineering company's engineering career database were analyzed to ascertain whether relationships linking future engineering capabilities, engineering disciplines, and years of engineering experience could be identified to define critical knowledge transfer models. Chi square, logistic, and linear regression analyses were used to map patterns of discipline-specific, mission-critical knowledge using archival data of engineers' perceptions of engineering capabilities, key developmental experiences, and knowledge learned from their engineering careers. The results from the study were used to document key engineering future capabilities. The results were then used to develop a proposed human capital retention plan to address specific key knowledge gaps of younger engineers as veteran engineers retire. The potential for social change from this study involves informing leaders of aerospace engineering corporations on how to build better quality mentoring or succession plans to fill the void of lost knowledge from retiring engineers. This plan can secure mission-critical knowledge for younger engineers for current and future product development and increased global competitiveness in the technology market.
NASA Astrophysics Data System (ADS)
Danos, Xenia; Barr, Ronald; Górska, Renata; Norman, Eddie
2014-11-01
Curriculum planning for the development of graphicacy capability has not been systematically included in general education to coincide with the graphicacy needs of human society. In higher education, graphicacy curricula have been developed to meet the needs of certain disciplines, for example medical and teacher training and engineering, among others. A framework for graphicacy curricula, anticipating the graphicacy needs in higher education, has yet to be strategically planned for general education. This is partly a result of lack of research effort in this area, but also a result of lack of systematic curriculum planning in general. This paper discusses these issues in the context of graphicacy curricula for engineering. The paper presents three broad individual case studies spanning Europe and the USA, brought together by the common denominator, graphicacy. The case studies are based on: an analysis of graphicacy within general education curricula, an analysis of graphicacy for engineering education in Europe and an analysis of graphicacy for engineering education in the USA. These three papers were originally presented in a plenary session at the American Society for Engineering Education, Engineering Design Graphics Division at the University of Limerick in November 2012. The case studies demonstrate the potential for strategic curriculum planning in regard to the development of graphicacy in general education and an overview of a methodology to achieve that. It also offers further evidence towards the importance of the systematic classification of graphics capabilities in Engineering and how the lack of a developed theoretical framework in this area undermines the case for the importance of graphics within engineering education.
NASA Astrophysics Data System (ADS)
Potter, Lucas; Arikatla, Sreekanth; Bray, Aaron; Webb, Jeff; Enquobahrie, Andinet
2017-03-01
Stenosis of the upper airway affects approximately 1 in 200,000 adults per year1 , and occurs in neonates as well2 . Its treatment is often dictated by institutional factors and clinicians' experience or preferences 3 . Objective and quantitative methods of evaluating treatment options hold the potential to improve care in stenosis patients. Virtual surgical planning software tools are critically important for this. The Virtual Pediatric Airway Workbench (VPAW) is a software platform designed and evaluated for upper airway stenosis treatment planning. It incorporates CFD simulation and geometric authoring with objective metrics from both that help in informed evaluation and planning. However, this planner currently lacks physiological information which could impact the surgical planning outcomes. In this work, we integrated a lumped parameter, model based human physiological engine called BioGears with VPAW. We demonstrated the use of physiology informed virtual surgical planning platform for patient-specific stenosis treatment planning. The preliminary results show that incorporating patient-specific physiology in the pretreatment plan would play important role in patient-specific surgical trainers and planners in airway surgery and other types of surgery that are significantly impacted by physiological conditions during surgery.
An Investigation of Engineering Students' Post-Graduation Plans inside or outside of Engineering
ERIC Educational Resources Information Center
Ro, Hyun Kyoung
2011-01-01
The question of students' post-graduation plans is a critical one for the field of engineering as both industry and higher education institutions seek to understand how to increase the production of highly-skilled individuals for the STEM workforce. Despite the concern, there are but a few empirical studies that examine how students' academic…
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for small engine repair I and II. Presented first are a program description…
76 FR 70927 - USACE's Plan for Retrospective Review Under E.O. 13563
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-16
... DEPARTMENT OF DEFENSE Department of the Army, Corps of Engineers 33 CFR Chapter II USACE's Plan for Retrospective Review Under E.O. 13563 AGENCY: U.S. Army Corps of Engineers, DoD. ACTION: Notice of intent and request for comments. SUMMARY: The U.S. Army Corps of Engineers (USACE) is seeking public...
Orbit transfer rocket engine technology program. Phase 2: Advanced engine study
NASA Technical Reports Server (NTRS)
Erickson, C.; Martinez, A.; Hines, B.
1987-01-01
In Phase 2 of the Advanced Engine Study, the Failure Modes and Effects Analysis (FMEA) maintenance-driven engine design, preliminary maintenance plan, and concept for space operable disconnects generated in Phase 1 were further developed. Based on the results of the vehicle contractors Orbit Transfer Vehicle (OTV) Concept Definition and System Analysis Phase A studies, minor revisions to the engine design were made. Additional refinements in the engine design were identified through further engine concept studies. These included an updated engine balance incorporating experimental heat transfer data from the Enhanced Heat Load Thrust Chamber Study and a Rao optimum nozzle contour. The preliminary maintenance plan of Phase 1 was further developed through additional studies. These included a compilation of critical component lives and life limiters and a review of the Space Shuttle Main Engine (SSME) operations and maintenance manual in order to begin outlining the overall maintenance procedures for the Orbit Transfer Vehicle Engine and identifying technology requirements for streamlining space-based operations. Phase 2 efforts also provided further definition to the advanced fluid coupling devices including the selection and preliminary design of a preferred concept and a preliminary test plan for its further development.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Eccleston, C.H.
1997-09-05
The National Environmental Policy Act (NEPA) of 1969 was established by Congress more than a quarter of a century ago, yet there is a surprising lack of specific tools, techniques, and methodologies for effectively implementing these regulatory requirements. Lack of professionally accepted techniques is a principal factor responsible for many inefficiencies. Often, decision makers do not fully appreciate or capitalize on the true potential which NEPA provides as a platform for planning future actions. New approaches and modem management tools must be adopted to fully achieve NEPA`s mandate. A new strategy, referred to as Total Federal Planning, is proposed formore » unifying large-scale federal planning efforts under a single, systematic, structured, and holistic process. Under this approach, the NEPA planning process provides a unifying framework for integrating all early environmental and nonenvironmental decision-making factors into a single comprehensive planning process. To promote effectiveness and efficiency, modem tools and principles from the disciplines of Value Engineering, Systems Engineering, and Total Quality Management are incorporated. Properly integrated and implemented, these planning tools provide the rigorous, structured, and disciplined framework essential in achieving effective planning. Ultimately, the goal of a Total Federal Planning strategy is to construct a unified and interdisciplinary framework that substantially improves decision-making, while reducing the time, cost, redundancy, and effort necessary to comply with environmental and other planning requirements. At a time when Congress is striving to re-engineer the governmental framework, apparatus, and process, a Total Federal Planning philosophy offers a systematic approach for uniting the disjointed and often convoluted planning process currently used by most federal agencies. Potentially this approach has widespread implications in the way federal planning is approached.« less
48 CFR 36.601-4 - Implementation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...
48 CFR 36.601-4 - Implementation.
Code of Federal Regulations, 2014 CFR
2014-10-01
... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...
48 CFR 36.601-4 - Implementation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...
48 CFR 36.601-4 - Implementation.
Code of Federal Regulations, 2013 CFR
2013-10-01
... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...
48 CFR 36.601-4 - Implementation.
Code of Federal Regulations, 2012 CFR
2012-10-01
... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...
Engineering Forum Strategic Plan
This Strategic Plan highlights the purpose, mission, goals, and objectives of the U.S. Environmental Protection Agency (EPA) Engineering Forum (EF). It sets forth the principles that guide the EF's decision-making, helps clarify the EF's priorities, and...
Photograph of line drawing in possession of Engineering Plans and ...
Photograph of line drawing in possession of Engineering Plans and Services Division, Rock Island Arsenal. MAP OF ROCK ISLAND ARSENAL, 1919, REVISED 1938 - Rock Island Arsenal, Rock Island, Rock Island County, IL
Architectural, Engineering, and Planning Consultant Services for Airport Grant Projects
DOT National Transportation Integrated Search
1994-02-16
This advisory circular (AC) provides guidance for airport sponsors in the : selection and employment of architectural, engineering, and planning consultants : under Federal Aviation Administration (FAA) airport grant programs. It also : discusses ser...
19. Power plant engine pipinglower level plan, sheet 80 of ...
19. Power plant engine piping-lower level plan, sheet 80 of 130 - Naval Air Station Fallon, Power Plant, 800 Complex, off Carson Road near intersection of Pasture & Berney Roads, Fallon, Churchill County, NV