Training for Three Wars Ago: Antiquated C-130H Pilot Training
2015-10-01
Computers/Air Operations Center] integration .14 The purpose of continuation training is to ensure pilots are current, qualified, and proficient in the...Historical Operational Missions ................................................................ 4 C-130 PILOT CONTINUATION TRAINING PROGRAM...together watching movies or TV. Without you, all this work is for naught. vi ABSTRACT Being one of the longest continually produced combat
33 CFR 150.620 - What are the requirements for protecting personnel from machinery?
Code of Federal Regulations, 2010 CFR
2010-07-01
... deepwater port operator must ensure that all personnel are protected from the risks created by operating..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) DEEPWATER PORTS DEEPWATER PORTS: OPERATIONS Workplace Safety and...
40 CFR 64.3 - Monitoring design criteria.
Code of Federal Regulations, 2010 CFR
2010-07-01
... that are adequate to ensure the continuing validity of the data. The owner or operator shall consider... and control device operational variability, the reliability and latitude built into the control...
46 CFR 78.90-1 - Pilot boarding operation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 3 2010-10-01 2010-10-01 false Pilot boarding operation. 78.90-1 Section 78.90-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS OPERATIONS Pilot Boarding Operations § 78.90-1 Pilot boarding operation. (a) The master shall ensure that pilot boarding...
46 CFR 78.90-1 - Pilot boarding operation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 3 2011-10-01 2011-10-01 false Pilot boarding operation. 78.90-1 Section 78.90-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS OPERATIONS Pilot Boarding Operations § 78.90-1 Pilot boarding operation. (a) The master shall ensure that pilot boarding...
LANL Multiyear Strategy Performance Improvement (MYSPI), Fiscal Years 2017–2021
DOE Office of Scientific and Technical Information (OSTI.GOV)
Leasure, Craig Scott
2016-05-03
Los Alamos National Laboratory (LANL) protects the nation and the world using innovative science, technology, and engineering through an integrated approach that harnesses the strength of our people, capabilities, and operations. The Laboratory’s Strategic Plan and Purpose statement provide the framework for scientific excellence and operational excellence now and in the future. Our Strategic Plan and Purpose help position Los Alamos for continuing mission success that ensures the safety, security, and effectiveness of the nation’s deterrent; protects the nation from nuclear and emerging threats through our larger global security missions; provides energy security to the nation; and ensures that themore » nation’s scientific reputation and capabilities remain robust enough to assure our allies and deter our adversaries. Moreover, we use these principles and guidance to ensure that Los Alamos is successful in attracting, recruiting, and retaining the next generation of world-class talent, while creating an efficient, environmentally responsible workplace that provides our employees with access to modern scientific tools and resources. Using this guidance and its underlying principles, we are continuing to restore credibility and operational effectiveness to the Laboratory, deliver mission success and continuing scientific excellence, and protect our employees and the nation’s secrets.« less
LANL Multiyear Strategy Performance Improvement (MYSPI), Fiscal Years 2018-2022
DOE Office of Scientific and Technical Information (OSTI.GOV)
Leasure, Craig Scott
Los Alamos National Laboratory (LANL) protects the nation and the world using innovative science, technology, and engineering through an integrated approach that harnesses the strength of our people, capabilities, and operations. The Laboratory’s Strategic Plan and Purpose statement provide the framework for scientific excellence and operational excellence now and in the future. Our Strategic Plan and Purpose help position Los Alamos for continuing mission success that ensures the safety, security, and effectiveness of the nation’s deterrent; protects the nation from nuclear and emerging threats through our larger global security missions; provides energy security to the nation; and ensures that themore » nation’s scientific reputation and capabilities remain robust enough to assure our allies and deter our adversaries. Moreover, we use these principles and guidance to ensure that Los Alamos is successful in attracting, recruiting, and retaining the next generation of excellent talent, while creating an efficient, environmentally responsible workplace that provides our employees with access to modern scientific tools and resources. Using this guidance and its underlying principles, we are continuing to restore credibility and operational effectiveness to the Laboratory, deliver mission success and continuing scientific excellence, and protect our employees and the nation’s secrets.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-22
... a continued high level of reliability of interstate natural gas pipelines and that this will, in turn, ensure a continued high level of reliability of the electric transmission grid.\\40\\ Consumers...
Code of Federal Regulations, 2012 CFR
2012-07-01
... recovered in a manner that ensures protection of human health and the environment (including surface water... to human health or the environment. (3) Ensure that all materials resulting from spills and leaks and... Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) PESTICIDE PROGRAMS PESTICIDE MANAGEMENT AND DISPOSAL...
Code of Federal Regulations, 2014 CFR
2014-07-01
... recovered in a manner that ensures protection of human health and the environment (including surface water... to human health or the environment. (3) Ensure that all materials resulting from spills and leaks and... Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) PESTICIDE PROGRAMS PESTICIDE MANAGEMENT AND DISPOSAL...
Code of Federal Regulations, 2011 CFR
2011-07-01
... recovered in a manner that ensures protection of human health and the environment (including surface water... to human health or the environment. (3) Ensure that all materials resulting from spills and leaks and... Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) PESTICIDE PROGRAMS PESTICIDE MANAGEMENT AND DISPOSAL...
Code of Federal Regulations, 2013 CFR
2013-07-01
... recovered in a manner that ensures protection of human health and the environment (including surface water... to human health or the environment. (3) Ensure that all materials resulting from spills and leaks and... Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) PESTICIDE PROGRAMS PESTICIDE MANAGEMENT AND DISPOSAL...
Code of Federal Regulations, 2010 CFR
2010-07-01
... recovered in a manner that ensures protection of human health and the environment (including surface water... to human health or the environment. (3) Ensure that all materials resulting from spills and leaks and... Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) PESTICIDE PROGRAMS PESTICIDE MANAGEMENT AND DISPOSAL...
49 CFR 1542.217 - Law enforcement personnel.
Code of Federal Regulations, 2014 CFR
2014-10-01
....217 Transportation Other Regulations Relating to Transportation (Continued) TRANSPORTATION SECURITY ADMINISTRATION, DEPARTMENT OF HOMELAND SECURITY CIVIL AVIATION SECURITY AIRPORT SECURITY Operations § 1542.217 Law enforcement personnel. (a) Each airport operator must ensure that law enforcement personnel used...
49 CFR 1542.217 - Law enforcement personnel.
Code of Federal Regulations, 2013 CFR
2013-10-01
....217 Transportation Other Regulations Relating to Transportation (Continued) TRANSPORTATION SECURITY ADMINISTRATION, DEPARTMENT OF HOMELAND SECURITY CIVIL AVIATION SECURITY AIRPORT SECURITY Operations § 1542.217 Law enforcement personnel. (a) Each airport operator must ensure that law enforcement personnel used...
49 CFR 1542.217 - Law enforcement personnel.
Code of Federal Regulations, 2011 CFR
2011-10-01
....217 Transportation Other Regulations Relating to Transportation (Continued) TRANSPORTATION SECURITY ADMINISTRATION, DEPARTMENT OF HOMELAND SECURITY CIVIL AVIATION SECURITY AIRPORT SECURITY Operations § 1542.217 Law enforcement personnel. (a) Each airport operator must ensure that law enforcement personnel used...
49 CFR 1542.217 - Law enforcement personnel.
Code of Federal Regulations, 2012 CFR
2012-10-01
....217 Transportation Other Regulations Relating to Transportation (Continued) TRANSPORTATION SECURITY ADMINISTRATION, DEPARTMENT OF HOMELAND SECURITY CIVIL AVIATION SECURITY AIRPORT SECURITY Operations § 1542.217 Law enforcement personnel. (a) Each airport operator must ensure that law enforcement personnel used...
Ten ways for provider units to weather this economic downturn.
Bernard, Amy
2009-05-01
The current economic recession challenges all continuing nursing education provider units to review operational practices and explore ways to maintain and ensure financial viability. Adjustments in programs are likely, as nurses seek more cost-effective ways of meeting their continuing education requirements. Further, employers are reducing staff and budgets. As a result, provider units need to reassess operations and refocus outcomes.
40 CFR 264.271 - Treatment program.
Code of Federal Regulations, 2013 CFR
2013-07-01
....271 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Land... land treatment program that is designed to ensure that hazardous constituents placed in or on the...
40 CFR 264.271 - Treatment program.
Code of Federal Regulations, 2010 CFR
2010-07-01
....271 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Land... land treatment program that is designed to ensure that hazardous constituents placed in or on the...
40 CFR 264.271 - Treatment program.
Code of Federal Regulations, 2014 CFR
2014-07-01
....271 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Land... land treatment program that is designed to ensure that hazardous constituents placed in or on the...
40 CFR 264.271 - Treatment program.
Code of Federal Regulations, 2011 CFR
2011-07-01
....271 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Land... land treatment program that is designed to ensure that hazardous constituents placed in or on the...
40 CFR 264.271 - Treatment program.
Code of Federal Regulations, 2012 CFR
2012-07-01
....271 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Land... land treatment program that is designed to ensure that hazardous constituents placed in or on the...
Andersson, Hans C; Perry, William; Bowdish, Bruce; Floyd-Browning, Phaidra
2011-10-01
Emergencies occur unpredictably and interrupt routine genetic care. The events after hurricanes Katrina and Rita have led to the recognition that a coherent plan is necessary to ensure continuity of operations for genetic centers and laboratories, including newborn screening. No geographic region is protected from the effects of a variety of potential emergencies. Regional and national efforts have begun to address the need for such preparedness, but a plan for ensuring continuity of operations by creating an emergency preparedness plan must be developed for each genetic center and laboratory, with attention to the interests of patients. This article describes the first steps in development of an emergency preparedness plan for individual centers.
40 CFR 75.48 - Petition for an alternative monitoring system.
Code of Federal Regulations, 2011 CFR
2011-07-01
... method of ensuring an accurate assessment of operating hourly conditions on a real-time basis. (9) A...) Hourly test data for the alternative monitoring system at each required operating level and fuel type... continuous emissions monitoring system at each required operating level and fuel type. The fuel type...
40 CFR 75.48 - Petition for an alternative monitoring system.
Code of Federal Regulations, 2014 CFR
2014-07-01
... method of ensuring an accurate assessment of operating hourly conditions on a real-time basis. (9) A...) Hourly test data for the alternative monitoring system at each required operating level and fuel type... continuous emissions monitoring system at each required operating level and fuel type. The fuel type...
40 CFR 75.48 - Petition for an alternative monitoring system.
Code of Federal Regulations, 2012 CFR
2012-07-01
... method of ensuring an accurate assessment of operating hourly conditions on a real-time basis. (9) A...) Hourly test data for the alternative monitoring system at each required operating level and fuel type... continuous emissions monitoring system at each required operating level and fuel type. The fuel type...
40 CFR 75.48 - Petition for an alternative monitoring system.
Code of Federal Regulations, 2013 CFR
2013-07-01
... method of ensuring an accurate assessment of operating hourly conditions on a real-time basis. (9) A...) Hourly test data for the alternative monitoring system at each required operating level and fuel type... continuous emissions monitoring system at each required operating level and fuel type. The fuel type...
40 CFR 75.48 - Petition for an alternative monitoring system.
Code of Federal Regulations, 2010 CFR
2010-07-01
... method of ensuring an accurate assessment of operating hourly conditions on a real-time basis. (9) A...) Hourly test data for the alternative monitoring system at each required operating level and fuel type... continuous emissions monitoring system at each required operating level and fuel type. The fuel type...
A corporate treasurer toolkit to ensure fund delivery in disaster zones.
Parandeh, Sassan Cyrus
In a disaster situation, the corporate treasury department of an organisation is also responsible for ensuring business continuity. The treasury department's key role would be to ensure that vendors, suppliers and employees are adequately remunerated and that operations do not seize due to a lack of working capital. Treasury practitioners concerned with business continuity have traditionally focused on three mainstay aspects of the initiative: (1) creating virtual or remote treasury offices; (2) training key backup staff on emergency procedures; (3) maintaining power and telecommunication connectivity with their cash concentration bank to guarantee treasury is able to transmit funding instructions to them. This paper aims to take business continuity measures for corporate treasury departments to a higher level of preparedness by asking one critical question: 'What will happen if the cash concentration bank or the entire banking system of a country in which a company has operations collapses?' Rarely have treasury professionals contemplated such a cataclysmic scenario. This paper aims to (1) validate that banking system failures are common, (2) rationalise why treasury practitioners need to devise contingency funding strategies outside of the banking system and (3) offer some viable alternatives to commercial banks. In this regard the author will draw from the experience of international non-governmental organisations that routinely respond to and operate in cataclysmic emergencies.
47 CFR 74.634 - Remote control operation.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES EXPERIMENTAL RADIO... control system must be designed, installed, and protected so that the transmitter can only be activated or... ensure proper operation. (3) The remote control system must be designed to prevent inadvertent...
47 CFR 74.634 - Remote control operation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES EXPERIMENTAL RADIO... control system must be designed, installed, and protected so that the transmitter can only be activated or... ensure proper operation. (3) The remote control system must be designed to prevent inadvertent...
47 CFR 74.634 - Remote control operation.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES EXPERIMENTAL RADIO... control system must be designed, installed, and protected so that the transmitter can only be activated or... ensure proper operation. (3) The remote control system must be designed to prevent inadvertent...
47 CFR 74.634 - Remote control operation.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES EXPERIMENTAL RADIO... control system must be designed, installed, and protected so that the transmitter can only be activated or... ensure proper operation. (3) The remote control system must be designed to prevent inadvertent...
47 CFR 74.634 - Remote control operation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES EXPERIMENTAL RADIO... control system must be designed, installed, and protected so that the transmitter can only be activated or... ensure proper operation. (3) The remote control system must be designed to prevent inadvertent...
76 FR 53129 - Proposed Agency Information Collection Activities; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-25
... shareholders. The Federal Reserve uses the data to monitor holding company operations and determine holding... continuing source of strength to its U.S. operations and to determine compliance with U.S. laws and... to analyze a BHC's overall financial condition to ensure safe and sound operations. The FR Y-9C...
LANL continuity of operations plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Senutovitch, Diane M
2010-12-22
The Los Alamos National Laboratory (LANL) is a premier national security research institution, delivering scientific and engineering solutions for the nation's most crucial and complex problems. Our primary responsibility is to ensure the safety, security, and reliability of the nation's nuclear stockpile. LANL emphasizes worker safety, effective operational safeguards and security, and environmental stewardship, outstanding science remains the foundation of work at the Laboratory. In addition to supporting the Laboratory's core national security mission, our work advances bioscience, chemistry, computer science, earth and environmental sciences, materials science, and physics disciplines. To accomplish LANL's mission, we must ensure that the Laboratorymore » EFs continue to be performed during a continuity event, including localized acts of nature, accidents, technological or attack-related emergencies, and pandemic or epidemic events. The LANL Continuity of Operations (COOP) Plan documents the overall LANL COOP Program and provides the operational framework to implement continuity policies, requirements, and responsibilities at LANL, as required by DOE 0 150.1, Continuity Programs, May 2008. LANL must maintain its ability to perform the nation's PMEFs, which are: (1) maintain the safety and security of nuclear materials in the DOE Complex at fixed sites and in transit; (2) respond to a nuclear incident, both domestically and internationally, caused by terrorist activity, natural disaster, or accident, including mobilizing the resources to support these efforts; and (3) support the nation's energy infrastructure. This plan supports Continuity of Operations for Los Alamos National Laboratory (LANL). This plan issues LANL policy as directed by the DOE 0 150.1, Continuity Programs, and provides direction for the orderly continuation of LANL EFs for 30 days of closure or 60 days for a pandemic/epidemic event. Initiation of COOP operations may be required to support an allhazards event, including a national security emergency, major fire, catastrophic natural disaster, man-made disaster, terrorism event, or technological disaster by rendering LANL buildings, infrastructure, or Technical Areas unsafe, temporarily unusable, or inaccessible.« less
33 CFR 150.602 - What occupational awareness training is required?
Code of Federal Regulations, 2013 CFR
2013-07-01
... HOMELAND SECURITY (CONTINUED) DEEPWATER PORTS DEEPWATER PORTS: OPERATIONS Workplace Safety and Health Safety and Health (general) § 150.602 What occupational awareness training is required? (a) Each deepwater port operator must ensure that all deepwater port personnel are provided with information and...
Closed-loop helium circulation system for actuation of a continuously operating heart catheter pump.
Karabegovic, Alen; Hinteregger, Markus; Janeczek, Christoph; Mohl, Werner; Gföhler, Margit
2017-06-09
Currently available, pneumatic-based medical devices are operated using closed-loop pulsatile or open continuous systems. Medical devices utilizing gases with a low atomic number in a continuous closed loop stream have not been documented to date. This work presents the construction of a portable helium circulation addressing the need for actuating a novel, pneumatically operated catheter pump. The design of its control system puts emphasis on the performance, safety and low running cost of the catheter pump. Static and dynamic characteristics of individual elements in the circulation are analyzed to ensure a proper operation of the system. The pneumatic circulation maximizes the working range of the drive unit inside the catheter pump while reducing the total size and noise production.Separate flow and pressure controllers position the turbine's working point into the stable region of the pressure creation element. A subsystem for rapid gas evacuation significantly decreases the duration of helium removal after a leak, reaching subatmospheric pressure in the intracorporeal catheter within several milliseconds. The system presented in the study offers an easy control of helium mass flow while ensuring stable behavior of its internal components.
33 CFR 150.616 - What are the requirements for lockout?
Code of Federal Regulations, 2010 CFR
2010-07-01
... lockout? 150.616 Section 150.616 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) DEEPWATER PORTS DEEPWATER PORTS: OPERATIONS Workplace Safety and Health Lockout/tagout § 150.616 What are the requirements for lockout? The deepwater port operator must ensure that, if...
40 CFR 63.462 - Batch cold cleaning machine standards.
Code of Federal Regulations, 2012 CFR
2012-07-01
... PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES... splashing against tank walls or parts being cleaned. (7) The owner or operator shall ensure that, when the...
40 CFR 63.462 - Batch cold cleaning machine standards.
Code of Federal Regulations, 2013 CFR
2013-07-01
... PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES... splashing against tank walls or parts being cleaned. (7) The owner or operator shall ensure that, when the...
40 CFR 63.462 - Batch cold cleaning machine standards.
Code of Federal Regulations, 2014 CFR
2014-07-01
... PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES... splashing against tank walls or parts being cleaned. (7) The owner or operator shall ensure that, when the...
40 CFR 63.462 - Batch cold cleaning machine standards.
Code of Federal Regulations, 2010 CFR
2010-07-01
... PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES... splashing against tank walls or parts being cleaned. (7) The owner or operator shall ensure that, when the...
40 CFR 63.462 - Batch cold cleaning machine standards.
Code of Federal Regulations, 2011 CFR
2011-07-01
... PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES... splashing against tank walls or parts being cleaned. (7) The owner or operator shall ensure that, when the...
Suggested set-up and layout of instruments and equipment for advanced operative laparoscopy.
Winer, W K; Lyons, T L
1995-02-01
Crucial elements that ensure the organization and smoothness of a laparoscopic procedure are clear communication among well-trained endoscopy team members, properly maintained equipment, and a sensible layout of the instruments. The team consists of the surgeon, surgical assistant, circulator, scrub nurse, laser nurse, and anesthesiologist. To promote continuity and interaction and to ensure a systematic, pleasant pace for laparoscopic procedures, the team should establish a specific routine, as well as set-up and layout of tables, equipment, and instruments. Key ingredients for advanced operative laparoscopy to be performed with optimum efficiency and effectiveness are the best organization and placement of the equipment, instrumentation, and team in a particular setting in the operating room.
40 CFR 62.14470 - When must I comply with this subpart if I plan to continue operation of my HMIWI?
Code of Federal Regulations, 2010 CFR
2010-07-01
... FOR DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Hospital/Medical/Infectious... air pollution control equipment or process changes such that the HMIWI is brought on line, and ensuring that all necessary process changes and air pollution control equipment are operating properly. (3...
40 CFR 62.14470 - When must I comply with this subpart if I plan to continue operation of my HMIWI?
Code of Federal Regulations, 2011 CFR
2011-07-01
... FOR DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Hospital/Medical/Infectious... air pollution control equipment or process changes such that the HMIWI is brought on line, and ensuring that all necessary process changes and air pollution control equipment are operating properly. (3...
33 CFR 150.619 - What are the fall arrest system requirements?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false What are the fall arrest system... SECURITY (CONTINUED) DEEPWATER PORTS DEEPWATER PORTS: OPERATIONS Workplace Safety and Health Fall Arrest § 150.619 What are the fall arrest system requirements? (a) The deepwater port operator must ensure that...
33 CFR 150.619 - What are the fall arrest system requirements?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false What are the fall arrest system... SECURITY (CONTINUED) DEEPWATER PORTS DEEPWATER PORTS: OPERATIONS Workplace Safety and Health Fall Arrest § 150.619 What are the fall arrest system requirements? (a) The deepwater port operator must ensure that...
33 CFR 150.619 - What are the fall arrest system requirements?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false What are the fall arrest system... SECURITY (CONTINUED) DEEPWATER PORTS DEEPWATER PORTS: OPERATIONS Workplace Safety and Health Fall Arrest § 150.619 What are the fall arrest system requirements? (a) The deepwater port operator must ensure that...
33 CFR 150.619 - What are the fall arrest system requirements?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false What are the fall arrest system... SECURITY (CONTINUED) DEEPWATER PORTS DEEPWATER PORTS: OPERATIONS Workplace Safety and Health Fall Arrest § 150.619 What are the fall arrest system requirements? (a) The deepwater port operator must ensure that...
33 CFR 150.619 - What are the fall arrest system requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false What are the fall arrest system... SECURITY (CONTINUED) DEEPWATER PORTS DEEPWATER PORTS: OPERATIONS Workplace Safety and Health Fall Arrest § 150.619 What are the fall arrest system requirements? (a) The deepwater port operator must ensure that...
33 CFR 142.4 - Duties of lessees, permittees, and persons responsible for actual operations.
Code of Federal Regulations, 2010 CFR
2010-07-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OUTER CONTINENTAL SHELF ACTIVITIES WORKPLACE... operations. (a) Each holder of a lease or permit under the Act shall ensure that all places of employment... with workplace safety and health regulations of this part and, in addition, free from recognized...
49 CFR 1180.1 - General policy statement for merger or control of at least two Class I railroads.
Code of Federal Regulations, 2010 CFR
2010-10-01
... shippers, environmental safeguards, and fair working conditions for employees. The Board must ensure that... continues to operate in a competitive environment, its new efficiencies would be shared with shippers and...) Reduction of competition. Although in specific markets railroads operate in a highly competitive environment...
XMM-Newton mission operations - ready for its third decade
NASA Astrophysics Data System (ADS)
Kirsch, M.; Finn, T.; Godard, T.; v. Krusenstiern, N.; Pfeil, N.; Salt, D.; Toma, L.; Webert, D.; Weissmann, U.
2017-10-01
The XMM-Newton X-ray space observatory is approaching its third decade of operations. The spacecraft and payload are operating without major degradation and scientific demand is continuously very high. With the change to a new way of using the Attitude and Orbit control System in 2013 the fuel consumption was reduced by a factor of two, additionally this has reduced stress on the reaction wheels. The challenge for the next decade is now to ensure that the saved fuel is available for continuous usage. We will describe the process of the so called 'fuel migration and replenishment' activities needed to keep the spacecraft operational potentially up to 2029+. We provide as well an overall health status of the mission, the evolution of the ground segment and concepts on streamlining mission operations with continued high safety requirements using automation tools.
The National Space Science Data Center: An operational perspective
NASA Technical Reports Server (NTRS)
Blitstein, Ronald; Green, James L.
1991-01-01
The National Space Science Data Center (NSSDC) manages over 110,000 data tapes with over 4,000 data sets. The size of the digital archive is approximately 6,000 GBytes and is expected to grow to more than 28,000 GBytes by 1995. The NSSDC is involved in several initiatives to better serve the scientific community and improve the management of current and future data holdings. These initiatives address the need to manage data to ensure ready access by the user and manage the media to ensure continuing accessibility and integrity of the data. An operational view of the NSSDC, outlining current policies and procedures that have been implemented to ensure the effective use of available resources to support service and mission goals, and maintain compliance with prescribed data management directives is presented.
The National Space Science Data Center: An operational perspective
NASA Technical Reports Server (NTRS)
Blitstein, Ronald; Green, James L.
1992-01-01
The National Space Science Data Center (NSSDC) manages over 110,000 data tapes with over 4,000 data sets. The size of the digital archive is approximately 6,000 GBytes and is expected to grow to more than 28,000 GBytes by 1995. The NSSDC is involved in several initiatives to better serve the scientific community and improve the management of current and future data holdings. These initiatives address the need to manage data to ensure ready access by the user and manage the media to ensure continuing accessibility and integrity of the data. This paper will present an operational view of the NSSDC, outlining current policies and procedures that were implemented to ensure the effective use of available resources to support service and mission goals, and maintain compliance with prescribed data management directives.
Hall, Stacey A; Allen, Brandon L; Phillips, Dennis
2016-01-01
College athletic departments have a responsibility to provide a safe environment for student-athletes; however, most colleges do not have a crisis management plan that includes procedures for displaced student-athletes or alternate facilities to perform athletic events. Continuity of operations planning ensures athletic programs are equipped to maintain essential functions during, or shortly after, a disruption of operations due to possible hazards. Previous studies have identified a lack of emergency preparedness and continuity planning in college athletic departments. The purpose of this article is to illustrate in detail one approach to disaster planning for college athletic departments, namely the Federal Emergency Management Agency (FEMA) continuity of operations framework. By adhering to FEMA guidelines and promoting a best practices model, athletic programs can effectively plan to address potential hazards, as well as protect the organization's brand, image, and financial sustainability after a crisis event.
ERIC Educational Resources Information Center
Office of Inspector General (ED), Washington, DC.
This report from the Office of Inspector General (OIG) identifies systemic weaknesses in the operations and programs of the U.S. Department of Education (ED). The office provides accurate financial information to make informed decisions, manage for results, and ensure operation integrity. Vigorous fraud investigations are continuing. Audits reveal…
The impact of urban operations on helicopter noise requirements
NASA Technical Reports Server (NTRS)
Spector, S. R.
1978-01-01
The interrelationship of urban helicopter operations, helicopter noise, and the establishment of urban public-use heliports is discussed. Public resistance to urban helicopter operations due to concern for safety and noise is shown to negatively impact the establishment of public-use heliports in urban centers. It is indicated that increased government and industry effort to reduce helicopter noise is needed to ensure continued growth in the helicopter industry.
The Landsat Data Continuity Mission Operational Land Imager: Pre-Launch Performance
NASA Technical Reports Server (NTRS)
Markham, Brian L.; Knight, Edward J.; Canova, Brent; Donley, Eric; Kvaran, Geir; Lee, Kenton
2011-01-01
The Operational Land Imager(OLI) will be the main instrument on Landsat-8 when it launches in 2012. OLI represents a generational change from heritage Landsat instruments in its design but must maintain data continuity with the 30+ year Landsat data archive. As a result, OLI has undergone a stringent calibration and characterization campaign to ensure its characteristics are understood and consistent with past instruments. This paper presents an overview of the OLI design, its major differences from previous Landsat instruments, and a summary of its expected performance.
Ensuring the Continued Relevance of Long Range Surveillance Units
2002-05-31
reconnaissance units (see figure 2). 18 XXX XXX XX XX Corps Area of OperationsDivision Area of Operations Corps FLOT Division FLOT Scouts, Recon Teams 0 LRSC...while a student in LRSLC stated: “You just can’t beat it. A lot of guys don’t like it because you don’t get an award for it. It’s not a sexy
DOE Office of Scientific and Technical Information (OSTI.GOV)
Krichinsky, Alan M; Miller, Paul; Pickett, Chris A
2009-01-01
Oak Ridge National Laboratory is demonstrating the integration of UF6 cylinder tracking, using RF technology, with continuous load cell monitoring (CLCM) at mock UF6 feed and withdrawal (F&W) stations. CLCM and cylinder tracking are two of several continuous-monitoring technologies that show promise in providing integrated safeguards of F&W operations at enrichment plants. Integrating different monitoring technologies allows advanced, automated event processing to screen innocuous events thereby minimizing false alerts to independent inspectors. Traditionally, international inspectors rely on batch verification of material inputs and outputs derived from operator declarations and periodic on-site inspections at uranium enrichment plants or other nuclear processingmore » facilities. Continuously monitoring F&W activities between inspections while providing filtered alerts of significant operational events will substantially increase the amount of valuable information available to inspectors thereby promising to enhance the effectiveness of safeguards and to improve efficiency in conducting on-site inspections especially at large plants for ensuring that all operations are declared.« less
Selective sequential precipitation of dissolved metals in mine drainage from coal mine
NASA Astrophysics Data System (ADS)
Yim, Giljae; Bok, Songmin; Ji, Sangwoo; Oh, Chamteut; Cheong, Youngwook; Han, Youngsoo; Ahn, Joosung
2017-04-01
In abandoned mines in Korea, a large amount of mine drainage continues to flow out and spread pollution. In purification of the mine drainage a massive amount of sludge is generated as waste. Since this metal sludge contains high Fe, Al and Mn oxides, developing the treatment method to recover homogeneous individual metal with high purity may beneficial to recycle waste metals as useful resources and reduce the amount of sludge production. In this regard, we established a dissolved metals selective precipitation process to treat Waryong Industry's mine drainage. The process that selectively precipitates metals dissolved in mine drainage is a continuous Fe-buffer-Al process, and each process consists of the neutralization tank, the coagulation tank, and the settling tank. Based on this process, this study verified the operational applicability of the Fe and Al selective precipitation. Our previous study revealed that high-purity Fe and Al precipitates could be recovered at a flow rate of 1.5 ton/day, while the lower purity was achieved when the rate was increased to about 3 ton/day due to the difficulty in reagent dosage control. In the current study was conducted to increase the capacity of the system to recover Fe and Al as high-purity precipitates at a flow rate of 10 ton/day with the ensured continuous operations by introducing an automatic reagent injection system. The previous study had a difficulty in controlling the pH and operating system continuously due to the manually controlled reagent injection system. To upgrade this and ensure the optimal pH in a stable way, a continuous reagent injection system was installed. The result of operation of the 10 ton/day system confirmed that the scaled-up process could maintain the stable recovery rates and purities of precipitates on site.
40 CFR 437.41 - Special definitions.
Code of Federal Regulations, 2013 CFR
2013-07-01
... procedures it has adopted will ensure its treatment systems are well-operated and maintained. ... STANDARDS (CONTINUED) THE CENTRALIZED WASTE TREATMENT POINT SOURCE CATEGORY Multiple Wastestreams § 437.41 Special definitions. (a) Initial Certification Statement for this subpart means a written submission to...
40 CFR 437.41 - Special definitions.
Code of Federal Regulations, 2012 CFR
2012-07-01
... procedures it has adopted will ensure its treatment systems are well-operated and maintained. ... STANDARDS (CONTINUED) THE CENTRALIZED WASTE TREATMENT POINT SOURCE CATEGORY Multiple Wastestreams § 437.41 Special definitions. (a) Initial Certification Statement for this subpart means a written submission to...
40 CFR 437.41 - Special definitions.
Code of Federal Regulations, 2014 CFR
2014-07-01
... procedures it has adopted will ensure its treatment systems are well-operated and maintained. ... STANDARDS (CONTINUED) THE CENTRALIZED WASTE TREATMENT POINT SOURCE CATEGORY Multiple Wastestreams § 437.41 Special definitions. (a) Initial Certification Statement for this subpart means a written submission to...
Verification and Implementation of Operations Safety Controls for Flight Missions
NASA Technical Reports Server (NTRS)
Smalls, James R.; Jones, Cheryl L.; Carrier, Alicia S.
2010-01-01
There are several engineering disciplines, such as reliability, supportability, quality assurance, human factors, risk management, safety, etc. Safety is an extremely important engineering specialty within NASA, and the consequence involving a loss of crew is considered a catastrophic event. Safety is not difficult to achieve when properly integrated at the beginning of each space systems project/start of mission planning. The key is to ensure proper handling of safety verification throughout each flight/mission phase. Today, Safety and Mission Assurance (S&MA) operations engineers continue to conduct these flight product reviews across all open flight products. As such, these reviews help ensure that each mission is accomplished with safety requirements along with controls heavily embedded in applicable flight products. Most importantly, the S&MA operations engineers are required to look for important design and operations controls so that safety is strictly adhered to as well as reflected in the final flight product.
33 CFR 127.1315 - Preliminary transfer inspection.
Code of Federal Regulations, 2010 CFR
2010-07-01
... (CONTINUED) WATERFRONT FACILITIES WATERFRONT FACILITIES HANDLING LIQUEFIED NATURAL GAS AND LIQUEFIED HAZARDOUS GAS Waterfront Facilities Handling Liquefied Hazardous Gas Operations § 127.1315 Preliminary... capacity of each storage tank to or from which LHG will be transferred, to ensure that it is safe for...
14 CFR 145.153 - Supervisory personnel requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... (CONTINUED) SCHOOLS AND OTHER CERTIFICATED AGENCIES REPAIR STATIONS Personnel § 145.153 Supervisory personnel requirements. (a) A certificated repair station must ensure it has a sufficient number of supervisors to direct the work performed under the repair station certificate and operations specifications. The supervisors...
14 CFR 145.153 - Supervisory personnel requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... (CONTINUED) SCHOOLS AND OTHER CERTIFICATED AGENCIES REPAIR STATIONS Personnel § 145.153 Supervisory personnel requirements. (a) A certificated repair station must ensure it has a sufficient number of supervisors to direct the work performed under the repair station certificate and operations specifications. The supervisors...
14 CFR 145.153 - Supervisory personnel requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... (CONTINUED) SCHOOLS AND OTHER CERTIFICATED AGENCIES REPAIR STATIONS Personnel § 145.153 Supervisory personnel requirements. (a) A certificated repair station must ensure it has a sufficient number of supervisors to direct the work performed under the repair station certificate and operations specifications. The supervisors...
14 CFR 145.153 - Supervisory personnel requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... (CONTINUED) SCHOOLS AND OTHER CERTIFICATED AGENCIES REPAIR STATIONS Personnel § 145.153 Supervisory personnel requirements. (a) A certificated repair station must ensure it has a sufficient number of supervisors to direct the work performed under the repair station certificate and operations specifications. The supervisors...
14 CFR 145.153 - Supervisory personnel requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... (CONTINUED) SCHOOLS AND OTHER CERTIFICATED AGENCIES REPAIR STATIONS Personnel § 145.153 Supervisory personnel requirements. (a) A certificated repair station must ensure it has a sufficient number of supervisors to direct the work performed under the repair station certificate and operations specifications. The supervisors...
IPHE Regulations Codes and Standards Working Group - Type IV COPV Round Robin Testing
NASA Technical Reports Server (NTRS)
Maes, M.; Starritt, L.; Zheng, J. Y.; Ou, K.; Keller, J.
2017-01-01
This manuscript presents the results of a multi-lateral international activity intended to understand how to execute a cycle stress test as specified in a chosen standard (GTR, SAE, ISO, EIHP...). The purpose of this work was to establish a harmonized test method protocol to ensure that the same results would be achieved regardless of the testing facility. It was found that accurate temperature measurement of the working fluid is necessary to ensure the test conditions remain within the tolerances specified. Continuous operation is possible with adequate cooling of the working fluid but this becomes more demanding if the cycle frequency increases. Recommendations for future test system design and operation are presented.
Adapting viral safety assurance strategies to continuous processing of biological products.
Johnson, Sarah A; Brown, Matthew R; Lute, Scott C; Brorson, Kurt A
2017-01-01
There has been a recent drive in commercial large-scale production of biotechnology products to convert current batch mode processing to continuous processing manufacturing. There have been reports of model systems capable of adapting and linking upstream and downstream technologies into a continuous manufacturing pipeline. However, in many of these proposed continuous processing model systems, viral safety has not been comprehensively addressed. Viral safety and detection is a highly important and often expensive regulatory requirement for any new biological product. To ensure success in the adaption of continuous processing to large-scale production, there is a need to consider the development of approaches that allow for seamless incorporation of viral testing and clearance/inactivation methods. In this review, we outline potential strategies to apply current viral testing and clearance/inactivation technologies to continuous processing, as well as modifications of existing unit operations to ensure the successful integration of viral clearance into the continuous processing of biological products. Biotechnol. Bioeng. 2017;114: 21-32. © 2016 Wiley Periodicals, Inc. © 2016 Wiley Periodicals, Inc.
Laboratory Information Systems Management and Operations.
Cucoranu, Ioan C
2015-06-01
The main mission of a laboratory information system (LIS) is to manage workflow and deliver accurate results for clinical management. Successful selection and implementation of an anatomic pathology LIS is not complete unless it is complemented by specialized information technology support and maintenance. LIS is required to remain continuously operational with minimal or no downtime and the LIS team has to ensure that all operations are compliant with the mandated rules and regulations. Copyright © 2015 Elsevier Inc. All rights reserved.
2017-03-01
sales, leverage efficiencies, and achieve savings in commissary operations. Second, DeCA has not conducted cost - benefit analyses for costs ...conduct comprehensive cost - benefit analyses for service contracts and distribution options. DOD concurred with GAO’s first two recommendations and...partially concurred with the third recommendation. GAO continues to believe the cost - benefit analysis recommendation is valid
The design of an irradiator for the continuous processing of liquid latex
NASA Astrophysics Data System (ADS)
Reuter, O.; Langley, R.; Zn, Wan Manshol Bin W.
1998-06-01
This paper presents anew design concept for a gamma irradiation plant for the continuous processing of pumpable liquids. Typical applications of such a plant include ∗ the irradiation vulcanisation of natural latex rubber ∗ disinfection of municipal sewage sludge for agricultural use ∗ sterilisation of liquids in the pharmaceutical and cosmetics industries ∗ industrial processing of bulk liquids The authors describe the design and operation of the latex irradiator now operating on a small production scale in Malaysia and proposed developments. The design allows irradiation processing to be carried out under an inert or other gaseous environment. State-of-the-art computer control system ensures the fully automatic processing operation needed by industrial computers.
Operating a wide-area remote observing system for the W. M. Keck Observatory
NASA Astrophysics Data System (ADS)
Wirth, Gregory D.; Kibrick, Robert I.; Goodrich, Robert W.; Lyke, James E.
2008-07-01
For over a decade, the W. M. Keck Observatory's two 10-meter telescopes have been operated remotely from its Waimea headquarters. Over the last 6 years, WMKO remote observing has expanded to allow teams at dedicated sites in California to observe either in collaboration with colleagues in Waimea or entirely from the U.S. mainland. Once an experimental effort, the Observatory's mainland observing capability is now fully operational, supported on all science instruments (except the interferometer) and regularly used by astronomers at eight mainland sites. Establishing a convenient and secure observing capability from those sites required careful planning to ensure that they are properly equipped and configured. It also entailed a significant investment in hardware and software, including both custom scripts to simplify launching the instrument interface at remote sites and automated routers employing ISDN backup lines to ensure continuation of observing during Internet outages. Observers often wait until shortly before their runs to request use of the mainland facilities. Scheduling these requests and ensuring proper system operation prior to observing requires close coordination between personnel at WMKO and the mainland sites. An established protocol for approving requests and carrying out pre-run checkout has proven useful in ensuring success. The Observatory anticipates enhancing and expanding its remote observing system. Future plans include deploying dedicated summit computers for running VNC server software, implementing a web-based tracking system for mainland-based observing requests, expanding the system to additional mainland sites, and converting to full-time VNC operation for all instruments.
Pavement damage due to different tire and loading configurations on secondary roads.
DOT National Transportation Integrated Search
2009-10-15
Due to the large percentage of goods moved by commercial trucks and its ever-growing freight industry, the U.S. needs innovative technologies to improve the efficiency of trucking operations and ensure continuous growth of the economy. One example of...
47 CFR 80.1083 - Ship radio installations.
Code of Federal Regulations, 2010 CFR
2010-10-01
....1083 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES... equipment and systems; (2) Be so located as to ensure the greatest possible degree of safety and operational... permit radio-communications from the wings of the navigating bridge. Portable VHF equipment may be used...
10 CFR 61.42 - Protection of individuals from inadvertent intrusion.
Code of Federal Regulations, 2011 CFR
2011-01-01
....42 Section 61.42 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Performance Objectives § 61.42 Protection of individuals from inadvertent intrusion. Design, operation, and closure of the land disposal facility must ensure protection of any...
10 CFR 61.42 - Protection of individuals from inadvertent intrusion.
Code of Federal Regulations, 2013 CFR
2013-01-01
....42 Section 61.42 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Performance Objectives § 61.42 Protection of individuals from inadvertent intrusion. Design, operation, and closure of the land disposal facility must ensure protection of any...
10 CFR 61.42 - Protection of individuals from inadvertent intrusion.
Code of Federal Regulations, 2012 CFR
2012-01-01
....42 Section 61.42 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Performance Objectives § 61.42 Protection of individuals from inadvertent intrusion. Design, operation, and closure of the land disposal facility must ensure protection of any...
10 CFR 61.42 - Protection of individuals from inadvertent intrusion.
Code of Federal Regulations, 2014 CFR
2014-01-01
....42 Section 61.42 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Performance Objectives § 61.42 Protection of individuals from inadvertent intrusion. Design, operation, and closure of the land disposal facility must ensure protection of any...
10 CFR 61.42 - Protection of individuals from inadvertent intrusion.
Code of Federal Regulations, 2010 CFR
2010-01-01
....42 Section 61.42 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Performance Objectives § 61.42 Protection of individuals from inadvertent intrusion. Design, operation, and closure of the land disposal facility must ensure protection of any...
SAVY-4000 Surveillance and Life Extension Program Fiscal Year 2013 Annual Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stone, Timothy A.; Blair, Michael W.; Weis, Eric
2014-03-03
The Packaging Surveillance Program section of the DOE M441.1-1 /sup>1, Nuclear Material Packaging Manual (DOE, 2008) requires DOE contractors to “ensure that a surveillance program is established and implemented to ensure the nuclear material storage package continues to meet its design criteria.” In order to ensure continuing safe storage of nuclear material and the maximization of risk reduction, TA-55 has established a Surveillance Program to ensure storage container integrity for operations within its specified design life. The LANL SAVY-4000 Field Surveillance Plan2 defines the near-term field surveillance plan for SAVY-4000 containers as required by the Manual. A long-term surveillance planmore » will be established based on the results of the first several years of surveillance and the results of the lifetime extension studies as defined in the Accelerated Aging Plan3. This report details progress in positioning the Surveillance Program for successful implementation in FY14 and status of the Design Life Extension Program in terms of its implementation and data collection for FY13.« less
Healthy satellites provide quality service
NASA Astrophysics Data System (ADS)
Margittai, Paul
The procedures used by Telesat Canada to ensure the performance of Anik satellites is described. At the Satellite Telemetry, Tracking and Command station, each Anik satellite has its own dedicated antenna. Telemetered information from the satellites is received, processed and forwarded to the Satellite Control Center. There the satellite controllers issue all commands to the satellites, and continually monitor the telemetered data. These data, describing the state of health of the satellites, are then analyzed by engineering specialists. The satellites are held in their precise orbital positions by means of specially developed software. The Anik C and D satellites employ travelling wave tube amplifiers (TWTAs) in the transpounder channels. The TWTA saturated flux density (SFD) and equivalent isotropic radiated power (EIRP) are regularly measured and their trends scrutinized. This ensures that customers receive the radio frequency power needed for high-quality service. The satellite electrical power is supplied by the solar cell array and batteries. Power system performance is evaluated regularly to ensure that power is available to operate the required number of TWTAs. In addition to rain-fades, short service interruptions can be caused by high voltage trip-offs of TWTAs, and by electrostatic discharge related anomalies. To minimize these interruptions, Telesat ensures that the satellite controllers are fully trained and prepared for any eventuality, and the relevant operational procedures are continually refined. A fully trained staff of satellite controllers keep interruptions caused by high voltage trip-offs of TWTAs and by electrostatic discharge to a minimum.
Myerson, Allan S; Krumme, Markus; Nasr, Moheb; Thomas, Hayden; Braatz, Richard D
2015-03-01
This white paper provides a perspective of the challenges, research needs, and future directions for control systems engineering in continuous pharmaceutical processing. The main motivation for writing this paper is to facilitate the development and deployment of control systems technologies so as to ensure quality of the drug product. Although the main focus is on small-molecule pharmaceutical products, most of the same statements apply to biological drug products. An introduction to continuous manufacturing and control systems is followed by a discussion of the current status and technical needs in process monitoring and control, systems integration, and risk analysis. Some key points are that: (1) the desired objective in continuous manufacturing should be the satisfaction of all critical quality attributes (CQAs), not for all variables to operate at steady-state values; (2) the design of start-up and shutdown procedures can significantly affect the economic operation of a continuous manufacturing process; (3) the traceability of material as it moves through the manufacturing facility is an important consideration that can at least in part be addressed using residence time distributions; and (4) the control systems technologies must assure quality in the presence of disturbances, dynamics, uncertainties, nonlinearities, and constraints. Direct measurement, first-principles and empirical model-based predictions, and design space approaches are described for ensuring that CQA specifications are met. Ways are discussed for universities, regulatory bodies, and industry to facilitate working around or through barriers to the development of control systems engineering technologies for continuous drug manufacturing. Industry and regulatory bodies should work with federal agencies to create federal funding mechanisms to attract faculty to this area. Universities should hire faculty interested in developing first-principles models and control systems technologies for drug manufacturing that are easily transportable to industry. Industry can facilitate the move to continuous manufacturing by working with universities on the conception of new continuous pharmaceutical manufacturing process unit operations that have the potential to make major improvements in product quality, controllability, or reduced capital and/or operating costs. Regulatory bodies should ensure that: (1) regulations and regulatory practices promote, and do not derail, the development and implementation of continuous manufacturing and control systems engineering approaches; (2) the individuals who approve specific regulatory filings are sufficiently trained to make good decisions regarding control systems approaches; (3) provide regulatory clarity and eliminate/reduce regulatory risks; (4) financially support the development of high-quality training materials for use of undergraduate students, graduate students, industrial employees, and regulatory staff; (5) enhance the training of their own technical staff by financially supporting joint research projects with universities in the development of continuous pharmaceutical manufacturing processes and the associated control systems engineering theory, numerical algorithms, and software; and (6) strongly encourage the federal agencies that support research to fund these research areas. © 2014 Wiley Periodicals, Inc. and the American Pharmacists Association. © 2014 Wiley Periodicals, Inc. and the American Pharmacists Association.
Myerson, Allan S; Krumme, Markus; Nasr, Moheb; Thomas, Hayden; Braatz, Richard D
2015-03-01
This white paper provides a perspective of the challenges, research needs, and future directions for control systems engineering in continuous pharmaceutical processing. The main motivation for writing this paper is to facilitate the development and deployment of control systems technologies so as to ensure quality of the drug product. Although the main focus is on small-molecule pharmaceutical products, most of the same statements apply to biological drug products. An introduction to continuous manufacturing and control systems is followed by a discussion of the current status and technical needs in process monitoring and control, systems integration, and risk analysis. Some key points are that: (1) the desired objective in continuous manufacturing should be the satisfaction of all critical quality attributes (CQAs), not for all variables to operate at steady-state values; (2) the design of start-up and shutdown procedures can significantly affect the economic operation of a continuous manufacturing process; (3) the traceability of material as it moves through the manufacturing facility is an important consideration that can at least in part be addressed using residence time distributions; and (4) the control systems technologies must assure quality in the presence of disturbances, dynamics, uncertainties, nonlinearities, and constraints. Direct measurement, first-principles and empirical model-based predictions, and design space approaches are described for ensuring that CQA specifications are met. Ways are discussed for universities, regulatory bodies, and industry to facilitate working around or through barriers to the development of control systems engineering technologies for continuous drug manufacturing. Industry and regulatory bodies should work with federal agencies to create federal funding mechanisms to attract faculty to this area. Universities should hire faculty interested in developing first-principles models and control systems technologies for drug manufacturing that are easily transportable to industry. Industry can facilitate the move to continuous manufacturing by working with universities on the conception of new continuous pharmaceutical manufacturing process unit operations that have the potential to make major improvements in product quality, controllability, or reduced capital and/or operating costs. Regulatory bodies should ensure that: (1) regulations and regulatory practices promote, and do not derail, the development and implementation of continuous manufacturing and control systems engineering approaches; (2) the individuals who approve specific regulatory filings are sufficiently trained to make good decisions regarding control systems approaches; (3) provide regulatory clarity and eliminate/reduce regulatory risks; (4) financially support the development of high-quality training materials for use of undergraduate students, graduate students, industrial employees, and regulatory staff; (5) enhance the training of their own technical staff by financially supporting joint research projects with universities in the development of continuous pharmaceutical manufacturing processes and the associated control systems engineering theory, numerical algorithms, and software; and (6) strongly encourage the federal agencies that support research to fund these research areas. © 2014 Wiley Periodicals, Inc. and the American Pharmacists Association.
2005-09-01
information dominance . This thesis provides recommended line items for injection into the IP IQ in the appropriate format with discussions and definitions that address the specific line items. The thesis also provides further recommendations for the continuing improvement and refinement of the IP qualification process, especially in the area of
NASA Astrophysics Data System (ADS)
Burnett, W.
2016-12-01
The Department of Defense's (DoD) High Performance Computing Modernization Program (HPCMP) provides high performance computing to address the most significant challenges in computational resources, software application support and nationwide research and engineering networks. Today, the HPCMP has a critical role in ensuring the National Earth System Prediction Capability (N-ESPC) achieves initial operational status in 2019. A 2015 study commissioned by the HPCMP found that N-ESPC computational requirements will exceed interconnect bandwidth capacity due to the additional load from data assimilation and passing connecting data between ensemble codes. Memory bandwidth and I/O bandwidth will continue to be significant bottlenecks for the Navy's Hybrid Coordinate Ocean Model (HYCOM) scalability - by far the major driver of computing resource requirements in the N-ESPC. The study also found that few of the N-ESPC model developers have detailed plans to ensure their respective codes scale through 2024. Three HPCMP initiatives are designed to directly address and support these issues: Productivity Enhancement, Technology, Transfer and Training (PETTT), the HPCMP Applications Software Initiative (HASI), and Frontier Projects. PETTT supports code conversion by providing assistance, expertise and training in scalable and high-end computing architectures. HASI addresses the continuing need for modern application software that executes effectively and efficiently on next-generation high-performance computers. Frontier Projects enable research and development that could not be achieved using typical HPCMP resources by providing multi-disciplinary teams access to exceptional amounts of high performance computing resources. Finally, the Navy's DoD Supercomputing Resource Center (DSRC) currently operates a 6 Petabyte system, of which Naval Oceanography receives 15% of operational computational system use, or approximately 1 Petabyte of the processing capability. The DSRC will provide the DoD with future computing assets to initially operate the N-ESPC in 2019. This talk will further describe how DoD's HPCMP will ensure N-ESPC becomes operational, efficiently and effectively, using next-generation high performance computing.
Total Quality Management in Higher Education.
ERIC Educational Resources Information Center
Sherr, Lawrence A.; Lozier, G. Gredgory
1991-01-01
Total Quality Management, based on theories of W. Edward Deming and others, is a style of management using continuous process improvement characterized by mission and customer focus, a systematic approach to operations, vigorous development of human resources, long-term thinking, and a commitment to ensuring quality. The values espoused by this…
46 CFR 109.525 - Cranes: Working loads.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Cranes: Working loads. 109.525 Section 109.525 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS OPERATIONS Cranes § 109.525 Cranes: Working loads. The master or person in charge shall ensure that tables...
46 CFR 109.525 - Cranes: Working loads.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Cranes: Working loads. 109.525 Section 109.525 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS OPERATIONS Cranes § 109.525 Cranes: Working loads. The master or person in charge shall ensure that tables...
46 CFR 109.563 - Posting of documents.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Posting of documents. 109.563 Section 109.563 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS OPERATIONS Miscellaneous § 109.563 Posting of documents. The master or person in charge shall ensure that the following are...
46 CFR 109.563 - Posting of documents.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Posting of documents. 109.563 Section 109.563 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS OPERATIONS Miscellaneous § 109.563 Posting of documents. The master or person in charge shall ensure that the following are...
46 CFR 109.525 - Cranes: Working loads.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Cranes: Working loads. 109.525 Section 109.525 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS OPERATIONS Cranes § 109.525 Cranes: Working loads. The master or person in charge shall ensure that tables...
46 CFR 109.563 - Posting of documents.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Posting of documents. 109.563 Section 109.563 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS OPERATIONS Miscellaneous § 109.563 Posting of documents. The master or person in charge shall ensure that the following are...
46 CFR 109.525 - Cranes: Working loads.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Cranes: Working loads. 109.525 Section 109.525 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS OPERATIONS Cranes § 109.525 Cranes: Working loads. The master or person in charge shall ensure that tables...
46 CFR 109.563 - Posting of documents.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Posting of documents. 109.563 Section 109.563 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS OPERATIONS Miscellaneous § 109.563 Posting of documents. The master or person in charge shall ensure that the following are...
46 CFR 109.525 - Cranes: Working loads.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Cranes: Working loads. 109.525 Section 109.525 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS OPERATIONS Cranes § 109.525 Cranes: Working loads. The master or person in charge shall ensure that tables...
46 CFR 109.563 - Posting of documents.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Posting of documents. 109.563 Section 109.563 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS OPERATIONS Miscellaneous § 109.563 Posting of documents. The master or person in charge shall ensure that the following are...
12 CFR 360.9 - Large-bank deposit insurance determination modernization.
Code of Federal Regulations, 2010 CFR
2010-01-01
... market discipline, ensure equitable treatment of depositors at different institutions and reduce the FDIC... section for a covered institution that: Has a composite rating of 3, 4, or 5 under the Uniform Financial... operations of a large insured depository institution (defined as a “Covered Institution”) to continue...
40 CFR 265.112 - Closure plan; amendment of plan.
Code of Federal Regulations, 2013 CFR
2013-07-01
... (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND.... By May 19, 1981, or by six months after the effective date of the rule that first subjects a facility... description of other activities necessary during the partial and final closure periods to ensure that all...
Rep. Latham, Tom [R-IA-3
2013-09-20
House - 10/04/2013 Referred to the Subcommittee on Department Operations, Oversight, and Nutrition. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:
Improved harvesting systems for wet sites
Bryce J. Stokes; Alvin Schilling
1997-01-01
Environmentally acceptable and economical forest operations are needed for sustainable management of forest resources. Improved methods for harvesting and transporting timber are especially needed for wet sites. As the demand for hardwood lumber continues to increase, improved and alternative methods are needed to ensure acceptance of timber harvesting for the wet site...
46 CFR 169.825 - Wearing of safety belts.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Wearing of safety belts. 169.825 Section 169.825 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Operations § 169.825 Wearing of safety belts. The master of each vessel shall ensure that each person wears...
46 CFR 169.825 - Wearing of safety belts.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 7 2011-10-01 2011-10-01 false Wearing of safety belts. 169.825 Section 169.825 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Operations § 169.825 Wearing of safety belts. The master of each vessel shall ensure that each person wears...
40 CFR 98.364 - Monitoring and QA/QC requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... or operator shall document the procedures used to ensure the accuracy of gas flow rate, gas... (CONTINUED) MANDATORY GREENHOUSE GAS REPORTING Manure Management § 98.364 Monitoring and QA/QC requirements... fraction of total manure managed in each system component. (c) The CH4 concentration of gas from digesters...
40 CFR 98.364 - Monitoring and QA/QC requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... or operator shall document the procedures used to ensure the accuracy of gas flow rate, gas... (CONTINUED) MANDATORY GREENHOUSE GAS REPORTING Manure Management § 98.364 Monitoring and QA/QC requirements... fraction of total manure managed in each system component. (c) The CH4 concentration of gas from digesters...
40 CFR 98.364 - Monitoring and QA/QC requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... or operator shall document the procedures used to ensure the accuracy of gas flow rate, gas... (CONTINUED) MANDATORY GREENHOUSE GAS REPORTING Manure Management § 98.364 Monitoring and QA/QC requirements... fraction of total manure managed in each system component. (c) The CH4 concentration of gas from digesters...
46 CFR 131.730 - Shipboard stowage.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Shipboard stowage. 131.730 Section 131.730 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS OPERATIONS Work Vests § 131.730 Shipboard stowage. The master shall ensure that no work vest is stowed where any lifejacket is...
46 CFR 131.730 - Shipboard stowage.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Shipboard stowage. 131.730 Section 131.730 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS OPERATIONS Work Vests § 131.730 Shipboard stowage. The master shall ensure that no work vest is stowed where any lifejacket is...
46 CFR 131.730 - Shipboard stowage.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Shipboard stowage. 131.730 Section 131.730 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS OPERATIONS Work Vests § 131.730 Shipboard stowage. The master shall ensure that no work vest is stowed where any lifejacket is...
46 CFR 131.730 - Shipboard stowage.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Shipboard stowage. 131.730 Section 131.730 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS OPERATIONS Work Vests § 131.730 Shipboard stowage. The master shall ensure that no work vest is stowed where any lifejacket is...
46 CFR 131.730 - Shipboard stowage.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Shipboard stowage. 131.730 Section 131.730 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS OPERATIONS Work Vests § 131.730 Shipboard stowage. The master shall ensure that no work vest is stowed where any lifejacket is...
33 CFR 155.750 - Contents of transfer procedures.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) Monitor the level of cargo in the tank; and (ii) Shut down transfer operations in time to ensure that the... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Contents of transfer procedures... (CONTINUED) POLLUTION OIL OR HAZARDOUS MATERIAL POLLUTION PREVENTION REGULATIONS FOR VESSELS Transfer...
21 CFR 113.87 - Operations in the thermal processing room.
Code of Federal Regulations, 2013 CFR
2013-04-01
... (CONTINUED) FOOD FOR HUMAN CONSUMPTION THERMALLY PROCESSED LOW-ACID FOODS PACKAGED IN HERMETICALLY SEALED... should be made. (c) The initial temperature of the contents of the containers to be processed shall be accurately determined and recorded with sufficient frequency to ensure that the temperature of the product is...
21 CFR 113.87 - Operations in the thermal processing room.
Code of Federal Regulations, 2014 CFR
2014-04-01
... (CONTINUED) FOOD FOR HUMAN CONSUMPTION THERMALLY PROCESSED LOW-ACID FOODS PACKAGED IN HERMETICALLY SEALED... should be made. (c) The initial temperature of the contents of the containers to be processed shall be accurately determined and recorded with sufficient frequency to ensure that the temperature of the product is...
Talking about the Automobile Braking System
NASA Astrophysics Data System (ADS)
Xu, Zhiqiang
2017-12-01
With the continuous progress of society, the continuous development of the times, people’s living standards continue to improve, people continue to improve the pursuit. With the rapid development of automobile manufacturing, the car will be all over the tens of thousands of households, the increase in car traffic, a direct result of the incidence of traffic accidents. Brake system is the guarantee of the safety of the car, its technical condition is good or bad, directly affect the operational safety and transportation efficiency, so the brake system is absolutely reliable. The requirements of the car on the braking system is to have a certain braking force to ensure reliable work in all cases, light and flexible operation. Normal braking should be good performance, in addition to a foot sensitive, the emergency brake four rounds can not be too long, not partial, not ring.
Lagman, Ruth L; Walsh, Declan; LeGrand, Susan B; Davis, Mellar P
2011-03-01
The medical care of individuals with advanced disease is complex and has historically been fragmented and suboptimal. Palliative medicine attempts to address these needs. The Harry R. Horvitz Center for Palliative Medicine at the Cleveland Clinic is an established comprehensive integrated program. Structured and seamless clinical operations are important to ensure the best delivery of high-quality medical care and continuity for those affected by life-limiting illness.
2013-07-01
composed of vice admirals from the requirements, acquisition, and fleet communities, and has the mission of ensuring “the successful procurement...development, manning, training, sustainment, and operational employment” of the LCS, mission packages, and shore 4The LCS block buy contracts include fixed...capabilities, limitations, and safety issues to help reduce design and programmatic risks. Operational testing is intended to assess a weapon system’s
At the Ready: Planning for Business Continuity
ERIC Educational Resources Information Center
Sharp, Linda
2011-01-01
School system leaders never know when disaster may strike. Having a plan in place to protect vital data and systems is crucial. School system leaders need to be actively involved in crisis preparedness, planned response, and recovery to ensure student and staff safety and to make certain that all important operations, services, processes, and…
47 CFR 95.424 - (CB Rule 24) How do I have my CB station transmitter serviced?
Code of Federal Regulations, 2010 CFR
2010-10-01
... transmitter serviced? 95.424 Section 95.424 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED... maintenance as often as may be necessary to ensure proper operation. You must have all internal repairs or internal adjustments to your CB transmitter made in accordance with the Technical Regulations (see subpart...
40 CFR 63.5995 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2014 CFR
2014-07-01
... for continuity, oxidation, and galvanic corrosion. (c) For each integrating regeneration stream flow... a device that is capable of recording the total regeneration stream mass or volumetric flow for each regeneration cycle. (d) For any other control device, or for other capture systems, ensure that the CPMS is...
40 CFR 63.5995 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2012 CFR
2012-07-01
... for continuity, oxidation, and galvanic corrosion. (c) For each integrating regeneration stream flow... a device that is capable of recording the total regeneration stream mass or volumetric flow for each regeneration cycle. (d) For any other control device, or for other capture systems, ensure that the CPMS is...
40 CFR 63.5995 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2013 CFR
2013-07-01
... for continuity, oxidation, and galvanic corrosion. (c) For each integrating regeneration stream flow... a device that is capable of recording the total regeneration stream mass or volumetric flow for each regeneration cycle. (d) For any other control device, or for other capture systems, ensure that the CPMS is...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-09
... performance of aircraft, engines, and propellers as may be required to ensure safety in air transportation...-approved parts are installed on type certificated aircraft, and that continued airworthiness is maintained..., repair stations, aircraft owner/ operators, air carriers, and the general public who wish to report...
33 CFR 146.303 - Notice and written report of casualties.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Notice and written report of... shall ensure that the notice of casualty requirements of § 146.30 and the written report requirements of... SECURITY (CONTINUED) OUTER CONTINENTAL SHELF ACTIVITIES OPERATIONS Vessels § 146.303 Notice and written...
Rosetta science operations in support of the Philae mission
NASA Astrophysics Data System (ADS)
Ashman, Mike; Barthélémy, Maud; O`Rourke, Laurence; Almeida, Miguel; Altobelli, Nicolas; Costa Sitjà, Marc; García Beteta, Juan José; Geiger, Bernhard; Grieger, Björn; Heather, David; Hoofs, Raymond; Küppers, Michael; Martin, Patrick; Moissl, Richard; Múñoz Crego, Claudio; Pérez-Ayúcar, Miguel; Sanchez Suarez, Eduardo; Taylor, Matt; Vallat, Claire
2016-08-01
The international Rosetta mission was launched on 2nd March 2004 and after its ten year journey, arrived at its target destination of comet 67P/Churyumov-Gerasimenko, during 2014. Following the January 2014 exit from a two and half year hibernation period, Rosetta approached and arrived at the comet in August 2014. In November 2014, the Philae lander was deployed from Rosetta onto the comet's surface after which the orbiter continued its approximately one and a half year comet escort phase. The Rosetta Science Ground Segment's primary roles within the project are to support the Project Scientist and the Science Working Team, in order to ensure the coordination, development, validation and delivery of the desired science operations plans and their associated operational products throughout the mission., whilst also providing support to the Principle Investigator teams (including the Philae lander team) in order to ensure the provision of adequate data to the Planetary Science Archive. The lead up to, and execution of, the November 2014 Philae landing, and the subsequent Philae activities through 2015, have presented numerous unique challenges to the project teams. This paper discusses these challenges, and more specifically, their impact on the overall mission science planning activities. It details how the Rosetta Science Ground Segment has addressed these issues in collaboration with the other project teams in order to accommodate Philae operations within the continually evolving Rosetta science planning process.
Human-In-The-Loop Simulation in Support of Long-Term Sustainability of Light Water Reactors
Hallbert, Bruce P
2015-01-01
Reliable instrumentation, information, and control systems technologies are essential to ensuring safe and efficient operation of the U.S. light water reactor (LWR) fleet. These technologies affect every aspect of nuclear power plant (NPP) and balance-of-plant operations. In 1997, the National Research Council conducted a study concerning the challenges involved in modernization of digital instrumentation and control systems in NPPs. Their findings identified the need for new II&C technology integration. The NPP owners and operators realize that this analog technology represents a significant challenge to sustaining the operation of the current fleet of NPPs. Beyond control systems, new technologies are neededmore » to monitor and characterize the effects of aging and degradation in critical areas of key structures, systems, and components. The objective of the efforts sponsored by the U.S. Department of Energy is to develop, demonstrate, and deploy new digital technologies for II&C architectures and provide monitoring capabilities to ensure the continued safe, reliable, and economic operation of the nation’s NPPs.« less
Kim, H C; Khanwilkar, P S; Bearnson, G B; Olsen, D B
1997-01-01
An automatic physiological control system for the actively filled, alternately pumped ventricles of the volumetrically coupled, electrohydraulic total artificial heart (EHTAH) was developed for long-term use. The automatic control system must ensure that the device: 1) maintains a physiological response of cardiac output, 2) compensates for an nonphysiological condition, and 3) is stable, reliable, and operates at a high power efficiency. The developed automatic control system met these requirements both in vitro, in week-long continuous mock circulation tests, and in vivo, in acute open-chested animals (calves). Satisfactory results were also obtained in a series of chronic animal experiments, including 21 days of continuous operation of the fully automatic control mode, and 138 days of operation in a manual mode, in a 159-day calf implant.
Parallel operation of NH3 screw compressors - the optimum way
NASA Astrophysics Data System (ADS)
Pijnenburg, B.; Ritmann, J.
2015-08-01
The use of more smaller industrial NH3 screw compressors operating in parallel seems to offer the optimum way when it comes to fulfilling maximum part load efficiency, increased redundancy and other highly requested features in the industrial refrigeration industry today. Parallel operation in an optimum way can be selected to secure continuous operation and can in most applications be configured to ensure lower overall operating economy. New compressors are developed to meet requirements for flexibility in operation and are controlled in an intelligent way. The intelligent control system keeps focus on all external demands, but yet striving to offer always the lowest possible absorbed power, including in future scenarios with connection to smart grid.
Generalised summation-by-parts operators and variable coefficients
NASA Astrophysics Data System (ADS)
Ranocha, Hendrik
2018-06-01
High-order methods for conservation laws can be highly efficient if their stability is ensured. A suitable means mimicking estimates of the continuous level is provided by summation-by-parts (SBP) operators and the weak enforcement of boundary conditions. Recently, there has been an increasing interest in generalised SBP operators both in the finite difference and the discontinuous Galerkin spectral element framework. However, if generalised SBP operators are used, the treatment of the boundaries becomes more difficult since some properties of the continuous level are no longer mimicked discretely - interpolating the product of two functions will in general result in a value different from the product of the interpolations. Thus, desired properties such as conservation and stability are more difficult to obtain. Here, new formulations are proposed, allowing the creation of discretisations using general SBP operators that are both conservative and stable. Thus, several shortcomings that might be attributed to generalised SBP operators are overcome (cf. Nordström and Ruggiu (2017) [38] and Manzanero et al. (2017) [39]).
Clustering-based urbanisation to improve enterprise information systems agility
NASA Astrophysics Data System (ADS)
Imache, Rabah; Izza, Said; Ahmed-Nacer, Mohamed
2015-11-01
Enterprises are daily facing pressures to demonstrate their ability to adapt quickly to the unpredictable changes of their dynamic in terms of technology, social, legislative, competitiveness and globalisation. Thus, to ensure its place in this hard context, enterprise must always be agile and must ensure its sustainability by a continuous improvement of its information system (IS). Therefore, the agility of enterprise information systems (EISs) can be considered today as a primary objective of any enterprise. One way of achieving this objective is by the urbanisation of the EIS in the context of continuous improvement to make it a real asset servicing enterprise strategy. This paper investigates the benefits of EISs urbanisation based on clustering techniques as a driver for agility production and/or improvement to help managers and IT management departments to improve continuously the performance of the enterprise and make appropriate decisions in the scope of the enterprise objectives and strategy. This approach is applied to the urbanisation of a tour operator EIS.
2009-01-01
MFR ) and Reserve Affairs (RA) have implemented a series ofprograms and incentives in attempts to ameliorate the problem, but to date these initiatives...Forces Reserve ( MFR ) has transformed from a strategic reserve to an operational one. Manning structures, policies and practices that previously have...met MFR’s peacetime requirements need to be reexamined to ensure that MFR can continue to meet the country’s and Marine Corps’ wartime needs? The
Connecticut Biodiesel Power Generation Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grannis, Lee; York, Carla R.
Sabre will continue support of the emissions equipment and VARS issues to ensure all are resolved and the system is functioning as expected. The remote data collection to become more automated. Final project reports for data collection and system performance to be generated. Sabre continued to support the emissions equipment and VARS issues to ensure all are resolved and the system is functioning as expected. The remote data collection became more automated. Final project reports for data collection and system performance were generated and are part of this final report. Some Systems Sensors were replaced due to a lightning strike.more » Sample data charts are shown at the end of the report. During the project, Sabre Engineering provided support to the project team with regarding to troubleshooting technical issues and system integration with the local power utility company. The resulting lessons learned through Sabre’s participation in the project have been valuable to the integrity of the data collected as well as in providing BioPur Light & Power valuable insights into future operations and planning for possible expansion. The system monitoring and data collection system has been operating as designed and continues to provide relevant information to the system operators. The information routinely gathered automatically by the system also contributes to the REN and REC validations which are required to secure credit for these items. During the quarter, the remaining work on the operations and safety manual were completed and released for publication after screen shots were verified. The goal of this effort to provide an accurate set of precautions and procedures for the technology system that can be replicated to other similar system.« less
The Point of It All: Exploring Variations in Wind Vane Design
ERIC Educational Resources Information Center
Koballa, Thomas, Jr.
2008-01-01
A wind vane is a tool for making observations of wind direction and initiating inquiries about the weather. Its construction and use continue to be mainstays of the science education of elementary students. By providing students with the opportunity to discern critical features associated with the wind vane's operation, you can ensure that…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-02
... continue to use the land as passive wetlands, which will keep the property vacant and compatible with the... generating potential. The planned land use is for water recharge, ponding basin, and passive wetlands. The property will be kept mitigated to ensure that its passive use does not interfere with airport operations...
Continuous beer fermentation using immobilized yeast cell bioreactor systems.
Brányik, Tomás; Vicente, António A; Dostálek, Pavel; Teixeira, José A
2005-01-01
Traditional beer fermentation and maturation processes use open fermentation and lager tanks. Although these vessels had previously been considered indispensable, during the past decades they were in many breweries replaced by large production units (cylindroconical tanks). These have proved to be successful, both providing operating advantages and ensuring the quality of the final beer. Another promising contemporary technology, namely, continuous beer fermentation using immobilized brewing yeast, by contrast, has found only a limited number of industrial applications. Continuous fermentation systems based on immobilized cell technology, albeit initially successful, were condemned to failure for several reasons. These include engineering problems (excess biomass and problems with CO(2) removal, optimization of operating conditions, clogging and channeling of the reactor), unbalanced beer flavor (altered cell physiology, cell aging), and unrealized cost advantages (carrier price, complex and unstable operation). However, recent development in reactor design and understanding of immobilized cell physiology, together with application of novel carrier materials, could provide a new stimulus to both research and application of this promising technology.
Conducting Research on the International Space Station Using the EXPRESS Rack Facilities
NASA Technical Reports Server (NTRS)
Thompson, Sean W.; Lake, Robert E.
2014-01-01
EXPRESS Racks provide capability for payload access to ISS resources. The successful on-orbit operations and versatility of the EXPRESS Rack has facilitated the operations of many scientific areas, with the promise of continued payload support for years to come. EXPRESS Racks are currently deployed in the US Lab, Columbus and JEM. Process improvements and enhancements continue to improve the accommodations and make the integration and operations process more efficient. Payload Integration Managers serve as the primary interface between the ISS Program and EXPRESS Payload Developers. EXPRESS Project coordinates across multiple functional areas and organizations to ensure integrated EXPRESS Rack and subrack products and hardware are complete, accurate, on time, safe, and certified for flight. NASA is planning to expand the EXPRESS payload capacity by developing new Basic Express Racks expected to be on ISS in 2018.
The National Space Weather Strategy: Policy on Observations
NASA Astrophysics Data System (ADS)
Murtagh, W. J.
2016-12-01
Ensuring that the United States is prepared to respond to and recover from severe space weather storms is a priority to the President and to this Administration. We cannot ignore the potential impact space weather may have on key infrastructures and technologies including aviation and satellite operations, the electric power grid, and GPS applications. These technologies form the very backbone of the critical technology infrastructure we rely on for so much of what we do today. In October 2015, OSTP Director John Holdren announced the release of the National Space Weather Strategy and the National Space Weather Action Plan. The Strategy identifies goals and establishes the principles that will guide efforts to develop national space-weather preparedness in both the near and long term, while the Action Plan identifies specific activities, outcomes, and timelines that the Federal government must pursue to be prepared for and resilient to future space-weather events. The Strategy recognizes that observations are the backbone of forecast and warning capabilities. The Strategy also recognized that to achieve a robust operational program for space-weather observations, the United States must: (1) establish and sustain a foundational set of observations; (2) when feasible and cost effective, use data from multiple sources, including international, Federal, State, and local governments, as well as from the academic and industry sectors; (3) ensure the continuity of critical data sources; (4) continue to support sensors for solar and space physics research; (5) ensure data-assimilation techniques are in place; and (6) maintain archives for ground- and space-based data, which are essential for model development and benchmarking. In this talk we explore elements in the Space Weather Action Plan that will ensure our Nation has the information we need to enhance resilience to the risk of space weather.
DOE Office of Scientific and Technical Information (OSTI.GOV)
S.L. Austad, P.E.; L.E. Guillen, P.E.; C. W. McKnight, P.E.
The Remote-Handled Low-Level Waste (LLW) Disposal Project addresses an anticipated shortfall in remote-handled LLW disposal capability following cessation of operations at the existing facility, which will continue until it is full or until it must be closed in preparation for final remediation of the Subsurface Disposal Area (approximately at the end of Fiscal Year 2017). Development of a new onsite disposal facility will provide necessary remote-handled LLW disposal capability and will ensure continuity of operations that generate remote-handled LLW. This report documents the Code of Record for design of a new LLW disposal capability. The report is owned by themore » Design Authority, who can authorize revisions and exceptions. This report will be retained for the lifetime of the facility.« less
TDRS-L Spacecraft Fairing Encapsulation
2014-01-08
TITUSVILLE, Fla. – Inside the Astrotech payload processing facility in Titusville, United Launch Alliance engineers and technicians ensure precision as the Tracking and Data Relay Satellite, or TDRS-L, spacecraft is being encapsulated in its payload fairing in preparation for begin transported to Launch Complex 41 at Cape Canaveral Air Force Station. The TDRS-L satellite will be a part of the second of three next-generation spacecraft designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop a United Launch Alliance Atlas V rocket on January 23, 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay contact with orbiting spacecraft ranging from the International Space Station and Hubble Space Telescope to the array of scientific observatories. For more information, visit: http://www.nasa.gov/mission_pages/tdrs/home/index.html
46 CFR 97.15-75 - Test of inflatable hopper gate seals on Great Lakes bulk dry cargo vessels.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Test of inflatable hopper gate seals on Great Lakes bulk... (CONTINUED) CARGO AND MISCELLANEOUS VESSELS OPERATIONS Tests, Drills, and Inspections § 97.15-75 Test of... ensure that the inflatable hopper gate seals installed on vessels required to meet the damage stability...
46 CFR 97.15-75 - Test of inflatable hopper gate seals on Great Lakes bulk dry cargo vessels.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Test of inflatable hopper gate seals on Great Lakes bulk... (CONTINUED) CARGO AND MISCELLANEOUS VESSELS OPERATIONS Tests, Drills, and Inspections § 97.15-75 Test of... ensure that the inflatable hopper gate seals installed on vessels required to meet the damage stability...
46 CFR 97.15-75 - Test of inflatable hopper gate seals on Great Lakes bulk dry cargo vessels.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Test of inflatable hopper gate seals on Great Lakes bulk... (CONTINUED) CARGO AND MISCELLANEOUS VESSELS OPERATIONS Tests, Drills, and Inspections § 97.15-75 Test of... ensure that the inflatable hopper gate seals installed on vessels required to meet the damage stability...
Leading the Light: A Study of Financial and Organizational Sustainability of Friends Schools
ERIC Educational Resources Information Center
Betof, Ari M.
2011-01-01
As a leader, what can you do when economic turmoil threatens an organization that you have been entrusted to steward? How do you ensure that an organization with deep roots and clear purpose endures during prosperous and challenging times? How can an organization continue to live its mission while operating in an environment that threatens its…
Continuous Flow Aerobic Alcohol Oxidation Reactions Using a Heterogeneous Ru(OH)x/Al2O3 Catalyst
2015-01-01
Ru(OH)x/Al2O3 is among the more versatile catalysts for aerobic alcohol oxidation and dehydrogenation of nitrogen heterocycles. Here, we describe the translation of batch reactions to a continuous-flow method that enables high steady-state conversion and single-pass yields in the oxidation of benzylic alcohols and dehydrogenation of indoline. A dilute source of O2 (8% in N2) was used to ensure that the reaction mixture, which employs toluene as the solvent, is nonflammable throughout the process. A packed bed reactor was operated isothermally in an up-flow orientation, allowing good liquid–solid contact. Deactivation of the catalyst during the reaction was modeled empirically, and this model was used to achieve high conversion and yield during extended operation in the aerobic oxidation of 2-thiophene methanol (99+% continuous yield over 72 h). PMID:25620869
DOE Office of Scientific and Technical Information (OSTI.GOV)
Roberts, Bryan W.
2012-08-23
The Office of the Second Line of Defense (SLD) Megaports project team for Argentina will conduct operational testing and evaluation (OT&E) at Exolgan Container Terminal at the Port of Dock Sud from July 16-20, 2012; and at the Port of Buenos Aires from September 3-7, 2012. SLD is installing radiation detection equipment to screen export, import, and transshipment containers at these locations. The purpose of OT&E is to validate and baseline an operable system that meets the SLD mission and to ensure the system continues to perform as expected in an operational environment with Argentina Customs effectively adjudicating alarms.
Verification and Implementation of Operations Safety Controls for Flight Missions
NASA Technical Reports Server (NTRS)
Jones, Cheryl L.; Smalls, James R.; Carrier, Alicia S.
2010-01-01
Approximately eleven years ago, the International Space Station launched the first module from Russia, the Functional Cargo Block (FGB). Safety and Mission Assurance (S&MA) Operations (Ops) Engineers played an integral part in that endeavor by executing strict flight product verification as well as continued staffing of S&MA's console in the Mission Evaluation Room (MER) for that flight mission. How were these engineers able to conduct such a complicated task? They conducted it based on product verification that consisted of ensuring that safety requirements were adequately contained in all flight products that affected crew safety. S&MA Ops engineers apply both systems engineering and project management principles in order to gain a appropriate level of technical knowledge necessary to perform thorough reviews which cover the subsystem(s) affected. They also ensured that mission priorities were carried out with a great detail and success.
Research the Mechanism of Land Subsidence in Typical Area, Beijing
NASA Astrophysics Data System (ADS)
Liu, H.; Zhang, Y.; Wang, R.; Gu, Z.
2014-12-01
In recently years, the subsidence develop rapidly in Beijing. It can not be ignored the influence of the security of major project. Beijing Singapore city is located at the junction of Daxing and Hebei. The per captia water resources is 190m3.,far below the internationally safety limit 1000m3. The region is the dryland water resource and continued extraction groundwater caused land subsidence issue become increasingly prominent. With the Beijing Singapore city put into use, the amount of water shortages must further seriously and land subsidence subsidence area must be further increased. Therefore, monitor the land subsidence of Beijing Singapore city area and research its settlement mechanism, it is so important to ensure the safe operation of Beijing Singapore city . Explore the soil and water coupling mechanism of Beijing Singapore citya during land subsidence process, and optimize groundwater extraction program to ensure the safe operation of Beijing's second largest airport.
A phased approach to induced seismicity risk management
White, Joshua A.; Foxall, William
2014-01-01
This work describes strategies for assessing and managing induced seismicity risk during each phase of a carbon storage project. We consider both nuisance and damage potential from induced earthquakes, as well as the indirect risk of enhancing fault leakage pathways. A phased approach to seismicity management is proposed, in which operations are continuously adapted based on available information and an on-going estimate of risk. At each project stage, specific recommendations are made for (a) monitoring and characterization, (b) modeling and analysis, and (c) site operations. The resulting methodology can help lower seismic risk while ensuring site operations remain practical andmore » cost-effective.« less
Positioning hospitals for improved access to capital.
Ponton, Kevin T; Sandrick, Karen M
2002-11-01
Hospitals need to actively position themselves in the next 18 to 24 months to ensure continued access to financing. Hospitals need to shift their focus from investment income to operations. Hospitals should recognize the importance of balance-sheet liquidity to institutional investors. Not-for-profit hospitals should focus on both sides of the balance sheet. Healthcare executives need to develop effective leadership and investor-relations skills.
Integrating ecosystem services into national Forest Service policy and operations
Robert Deal; Lisa Fong; Erin Phelps; Emily Weidner; Jonas Epstein; Tommie Herbert; Mary Snieckus; Nikola Smith; Tania Ellersick; Greg Arthaud
2017-01-01
The ecosystem services concept describes the many benefits people receive from nature. It highlights the importance of managing public and private lands sustainably to ensure these benefits continue into the future, and it closely aligns with the U.S. Forest Service (USFS) mission to âsustain the health, diversity, and productivity of the Nationâs forests and...
Maritime Cyber Security University Research
2016-05-01
traffic so vital to the global economy . The vulnerabilities associated with reliance on digital systems in the maritime environment must be continuously...Abstract (MAXIMUM 200 WORDS) Modern maritime systems are highly complex digital systems to ensure the safety and efficient operation of the shipping...integrity of the entrances to our " digital ports" and work to develop practical cyber security solutions to protect the nation’s maritime
Maritime Cyber Security University Research: Phase 1
2016-05-01
the global economy . The vulnerabilities associated with reliance on digital systems in the maritime environment must be continuously examined. System...Report: Modern maritime systems are highly complex digital systems to ensure the safety and efficient operation of the shipping traffic so vital to...entrances to our " digital ports" and work to develop practical cyber security solutions to protect the nation’s maritime infrastructure. 17. Key
NASA Astrophysics Data System (ADS)
Glotov, V. V.; Ostroumov, I. V.; Romashchenko, M. A.
2018-05-01
To study the effect of phase-shift signals parameters on EMC of REM, a generalized signal generation model in a radio transmitter was developed which allows obtaining digital representations of phase-shift signals, which are a continuous pulse in the time domain and on the frequency axis with different signal element envelope shapes.
NASA Astrophysics Data System (ADS)
Nandi, S.; Layns, A. L.; Goldberg, M.; Gambacorta, A.; Ling, Y.; Collard, A.; Grumbine, R. W.; Sapper, J.; Ignatov, A.; Yoe, J. G.
2017-12-01
This work describes end to end operational implementation of high priority products from National Oceanic and Atmospheric Administration's (NOAA) operational polar-orbiting satellite constellation, to include Suomi National Polar-orbiting Partnership (S-NPP) and the Joint Polar Satellite System series initial satellite (JPSS-1), into numerical weather prediction and earth systems models. Development and evaluation needed for the initial implementations of VIIRS Environmental Data Records (EDR) for Sea Surface Temperature ingestion in the Real-Time Global Sea Surface Temperature Analysis (RTG) and Polar Winds assimilated in the National Weather Service (NWS) Global Forecast System (GFS) is presented. These implementations ensure continuity of data in these models in the event of loss of legacy sensor data. Also discussed is accelerated operational implementation of Advanced Technology Microwave Sounder (ATMS) Temperature Data Records (TDR) and Cross-track Infrared Sounder (CrIS) Sensor Data Records, identified as Key Performance Parameters by the National Weather Service. Operational use of SNPP after 28 October, 2011 launch took more than one year due to the learning curve and development needed for full exploitation of new remote sensing capabilities. Today, ATMS and CrIS data positively impact weather forecast accuracy. For NOAA's JPSS initial satellite (JPSS-1), scheduled for launch in late 2017, we identify scope and timelines for pre-launch and post-launch activities needed to efficiently transition these capabilities into operations. As part of these alignment efforts, operational readiness for KPPs will be possible as soon as 90 days after launch. The schedule acceleration is possible because of the experience with S-NPP. NOAA operational polar-orbiting satellite constellation provides continuity and enhancement of earth systems observations out to 2036. Program best practices and lessons learned will inform future implementation for follow-on JPSS-3 and -4 missions ensuring benefits and enhancements during the system's design life.
Designing for Wide-Area Situation Awareness in Future Power Grid Operations
NASA Astrophysics Data System (ADS)
Tran, Fiona F.
Power grid operation uncertainty and complexity continue to increase with the rise of electricity market deregulation, renewable generation, and interconnectedness between multiple jurisdictions. Human operators need appropriate wide-area visualizations to help them monitor system status to ensure reliable operation of the interconnected power grid. We observed transmission operations at a control centre, conducted critical incident interviews, and led focus group sessions with operators. The results informed a Work Domain Analysis of power grid operations, which in turn informed an Ecological Interface Design concept for wide-area monitoring. I validated design concepts through tabletop discussions and a usability evaluation with operators, earning a mean System Usability Scale score of 77 out of 90. The design concepts aim to support an operator's complete and accurate understanding of the power grid state, which operators increasingly require due to the critical nature of power grid infrastructure and growing sources of system uncertainty.
2013-11-01
CAPE CANAVERAL, Fla. – The United Launch Alliance Centaur upper stage that will boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft into orbit arrives at the Atlas Spaceflight Operations Center on Cape Canaveral Air Force Station for checkout in preparation for launch. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/ Jim Grossman
2013-11-01
CAPE CANAVERAL, Fla. – The United Launch Alliance Centaur upper stage that will boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft into orbit arrives at the Atlas Spaceflight Operations Center on Cape Canaveral Air Force Station for checkout in preparation for launch. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/ Jim Grossman
Remote-Handled Low-Level Waste Disposal Project Code of Record
DOE Office of Scientific and Technical Information (OSTI.GOV)
Austad, S. L.; Guillen, L. E.; McKnight, C. W.
2015-04-01
The Remote-Handled Low-Level Waste (LLW) Disposal Project addresses an anticipated shortfall in remote-handled LLW disposal capability following cessation of operations at the existing facility, which will continue until it is full or until it must be closed in preparation for final remediation of the Subsurface Disposal Area (approximately at the end of Fiscal Year 2017). Development of a new onsite disposal facility will provide necessary remote-handled LLW disposal capability and will ensure continuity of operations that generate remote-handled LLW. This report documents the Code of Record for design of a new LLW disposal capability. The report is owned by themore » Design Authority, who can authorize revisions and exceptions. This report will be retained for the lifetime of the facility.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Goodman, Lynne S.
'Money makes the world go round', as the song says. It definitely influences decommissioning decision-making and financial assurance for future decommissioning. This paper will address two money-related decommissioning topics. The first is the evaluation of whether to continue or to halt decommissioning activities at Fermi 1. The second is maintaining adequacy of financial assurance for future decommissioning of operating plants. Decommissioning costs considerable money and costs are often higher than originally estimated. If costs increase significantly and decommissioning is not well funded, decommissioning activities may be deferred. Several decommissioning projects have been deferred when decision-makers determined future spending is preferablemore » than current spending, or when costs have risen significantly. Decommissioning activity timing is being reevaluated for the Fermi 1 project. Assumptions for waste cost-escalation significantly impact the decision being made this year on the Fermi 1 decommissioning project. They also have a major impact on the estimated costs for decommissioning currently operating plants. Adequately funding full decommissioning during plant operation will ensure that the users who receive the benefit pay the full price of the nuclear-generated electricity. Funding throughout operation also will better ensure that money is available following shutdown to allow decommissioning to be conducted without need for additional funds.« less
Rotter, Thomas; Plishka, Christopher; Lawal, Adegboyega; Harrison, Liz; Sari, Nazmi; Goodridge, Donna; Flynn, Rachel; Chan, James; Fiander, Michelle; Poksinska, Bonnie; Willoughby, Keith; Kinsman, Leigh
2018-01-01
Industrial improvement approaches such as Lean management are increasingly being adopted in health care. Synthesis is necessary to ensure these approaches are evidence based and requires operationalization of concepts to ensure all relevant studies are included. This article outlines the process utilized to develop an operational definition of Lean in health care. The literature search, screening, data extraction, and data synthesis processes followed the recommendations outlined by the Cochrane Collaboration. Development of the operational definition utilized the methods prescribed by Kinsman et al. and Wieland et al. This involved extracting characteristics of Lean, synthesizing similar components to establish an operational definition, applying this definition, and updating the definition to address shortcomings. We identified two defining characteristics of Lean health-care management: (1) Lean philosophy, consisting of Lean principles and continuous improvement, and (2) Lean activities, which include Lean assessment activities and Lean improvement activities. The resulting operational definition requires that an organization or subunit of an organization had integrated Lean philosophy into the organization's mandate, guidelines, or policies and utilized at least one Lean assessment activity or Lean improvement activity. This operational definition of Lean management in health care will act as an objective screening criterion for our systematic review. To our knowledge, this is the first evidence-based operational definition of Lean management in health care.
Quantum-Well Infrared Photodetector (QWIP) Focal Plane Assembly
NASA Technical Reports Server (NTRS)
Jhabvala, Murzy; Jhabvala, Christine A.; Ewin, Audrey J.; Hess, Larry A.; Hartmann, Thomas M.; La, Anh T.
2012-01-01
A paper describes the Thermal Infrared Sensor (TIRS), a QWIP-based instrument intended to supplement the Operational Land Imager (OLI) for the Landsat Data Continuity Mission (LDCM). The TIRS instrument is a far-infrared imager operating in the pushbroom mode with two IR channels: 10.8 and 12 microns. The focal plane will contain three 640x512 QWIP arrays mounted on a silicon substrate. The silicon substrate is a custom-fabricated carrier board with a single layer of aluminum interconnects. The general fabrication process starts with a 4-in. (approx.10-cm) diameter silicon wafer. The wafer is oxidized, a single substrate contact is etched, and aluminum is deposited, patterned, and alloyed. This technology development is aimed at incorporating three large-format infrared detecting arrays based on GaAs QWIP technology onto a common focal plane with precision alignment of all three arrays. This focal plane must survive the rigors of flight qualification and operate at a temperature of 43 K (-230 C) for five years while orbiting the Earth. The challenges presented include ensuring thermal compatibility among all the components, designing and building a compact, somewhat modular system and ensuring alignment to very tight levels. The multi-array focal plane integrated onto a single silicon substrate is a new application of both QWIP array development and silicon wafer scale integration. The Invar-based assembly has been tested to ensure thermal reliability.
Subtlenoise: sonification of distributed computing operations
NASA Astrophysics Data System (ADS)
Love, P. A.
2015-12-01
The operation of distributed computing systems requires comprehensive monitoring to ensure reliability and robustness. There are two components found in most monitoring systems: one being visually rich time-series graphs and another being notification systems for alerting operators under certain pre-defined conditions. In this paper the sonification of monitoring messages is explored using an architecture that fits easily within existing infrastructures based on mature opensource technologies such as ZeroMQ, Logstash, and Supercollider (a synth engine). Message attributes are mapped onto audio attributes based on broad classification of the message (continuous or discrete metrics) but keeping the audio stream subtle in nature. The benefits of audio rendering are described in the context of distributed computing operations and may provide a less intrusive way to understand the operational health of these systems.
Building and Maintaining Organizational Infrastructure to Attain Clinical Excellence.
Lebak, Kelly; Lane, Jason; Taus, Richard; Kim, Hansol; Stecker, Michael S; Hall, Michael; Lane-Fall, Meghan B; Weiss, Mark S
2017-12-01
Active maintenance of highly functional teams is critical to ensuring safe, efficient patient care in the non-operating room anesthesia (NORA) suite. In addition to developing collaborative relationships and patient care protocols, individual and team training is needed. For anesthesiologists, this training must begin during residency. The training should be supplemented with continuing education in this field for providers who find themselves working in the NORA space. As NORA continues to grow, robust NORA-specific quality assurance and improvement programs will empower anesthesiologists with the tools they need to best care for these patients. Copyright © 2017 Elsevier Inc. All rights reserved.
Brensel, Robert; Brensel, Scott; Ng, Amy
2013-01-01
Since the New England Compounding Center disaster in 2012, the importance of following correct procedures during every phase of customized pharmacy has been a focus of governmental interest and action as well as public scrutiny. Many pharmacies rely on the rote review of standard operating procedures to ensure that staff members understand and follow protocols that ensure the safety and potency of all compounds prepared, but that approach to continuing education can be cumbersome and needlessly time-consuming. In addition, documenting and retrieving evidence of employee competence can be difficult. In this article, we describe our use of online technology to improve our methods of educating staff about the full range of standard operating procedures that must be followed in our pharmacy. The system we devised and implemented has proven to be effective, easy to update and maintain, very inexpensive, and user friendly. Its use has reduced the time previously required for a read-over review of standard operating procedures from 30 or 40 minutes to 5 or 10 minutes in weekly staff meetings, and we can now easily document and access proof of employees' comprehension of that content. It is our hope that other small compounding pharmacies will also find this system of online standard operating procedure review helpful.
NASA Astrophysics Data System (ADS)
Bäumer, Richard; Terrill, Richard; Wollnack, Simon; Werner, Herbert; Starossek, Uwe
2018-01-01
The twin rotor damper (TRD), an active mass damper, uses the centrifugal forces of two eccentrically rotating control masses. In the continuous rotation mode, the preferred mode of operation, the two eccentric control masses rotate with a constant angular velocity about two parallel axes, creating, under further operational constraints, a harmonic control force in a single direction. In previous theoretical work, it was shown that this mode of operation is effective for the damping of large, harmonic vibrations of a single degree of freedom (SDOF) oscillator. In this paper, the SDOF oscillator is assumed to be affected by a stochastic excitation force and consequently responds with several frequencies. Therefore, the TRD must deviate from the continuous rotation mode to ensure the anti-phasing between the harmonic control force of the TRD and the velocity of the SDOF oscillator. It is found that the required deviation from the continuous rotation mode increases with lower vibration amplitude. Therefore, an operation of the TRD in the continuous rotation mode is no longer efficient below a specific vibration-amplitude threshold. To additionally dampen vibrations below this threshold, the TRD can switch to another, more energy-consuming mode of operation, the swinging mode in which both control masses oscillate about certain angular positions. A power-efficient control algorithm is presented which uses the continuous rotation mode for large vibrations and the swinging mode for small vibrations. To validate the control algorithm, numerical and experimental investigations are performed for a single degree of freedom oscillator under stochastic excitation. Using both modes of operation, it is shown that the control algorithm is effective for the cases of free and stochastically forced vibrations of arbitrary amplitude.
Estimation of the temporary service life of DC arc plasmatron cathode
NASA Astrophysics Data System (ADS)
Kulygin, V. M.; Pereslavtsev, A. V.; Tresvyatskii, S. S.
2017-09-01
The service life of the cathode of a DC arc plasmatron continuously working with tubular electrodes that operate in the air has been considered using the semi-phenomenological approach. The thermal emission, that ensures the necessary flow of electrons, and the evaporation of the cathode material, which determines its erosion, have been taken as the basic physical phenomena that constitute the workflow. The relationships that enable the estimation of the cathode's operating time have been obtained using the known regularities of these phenomena and experimental data available in the literature. The resulting evaluations coincide satisfactorily with the endurance test results.
Blomberg, Ann-Catrin; Bisholt, Birgitta; Nilsson, Jan; Lindwall, Lillemor
2015-06-01
The aim of this study was to describe operating theatre nurses' (OTNs') perceptions of caring in perioperative practice. A qualitative descriptive design was performed. Data were collected with interviews were carried out with fifteen strategically selected operating theatre nurses from different operating theatres in the middle of Sweden. A phenomenographic analysis was used to analyse the interviews. The findings show that operating theatre nurses' perceptions of caring in perioperative practice can be summarised in one main category: To follow the patient all the way. Two descriptive categories emerged: To ensure continuity of patient care and keeping a watchful eye. The operating theatre nurses got to know the patient and as a result became responsible for the patient. They protected the patient's body and preserved patient dignity in perioperative practice. The findings show different aspects of caring in perioperative practice. OTNs wanted to be more involved in patient care and follow the patient throughout the perioperative nursing process. Although OTNs have the ambition to make the care in perioperative practice visible, there is today a medical technical approach which promotes OTNs continuing to offer care in secret. © 2014 Nordic College of Caring Science.
Operational Impacts of Operating Reserve Demand Curves on Production Cost and Reliability
DOE Office of Scientific and Technical Information (OSTI.GOV)
Krad, Ibrahim; Ibanez, Eduardo; Ela, Erik
The electric power industry landscape is continually evolving. As emerging technologies such as wind, solar, electric vehicles, and energy storage systems become more cost-effective and present in the system, traditional power system operating strategies will need to be reevaluated. The presence of wind and solar generation (commonly referred to as variable generation) may result in an increase in the variability and uncertainty of the net load profile. One mechanism to mitigate this is to schedule and dispatch additional operating reserves. These operating reserves aim to ensure that there is enough capacity online in the system to account for the increasedmore » variability and uncertainty occurring at finer temporal resolutions. A new operating reserve strategy, referred to as flexibility reserve, has been introduced in some regions. A similar implementation is explored in this paper, and its implications on power system operations are analyzed.« less
Operational Impacts of Operating Reserve Demand Curves on Production Cost and Reliability: Preprint
DOE Office of Scientific and Technical Information (OSTI.GOV)
Krad, Ibrahim; Ibanez, Eduardo; Ela, Erik
The electric power industry landscape is continually evolving. As emerging technologies such as wind, solar, electric vehicles, and energy storage systems become more cost-effective and present in the system, traditional power system operating strategies will need to be reevaluated. The presence of wind and solar generation (commonly referred to as variable generation) may result in an increase in the variability and uncertainty of the net load profile. One mechanism to mitigate this is to schedule and dispatch additional operating reserves. These operating reserves aim to ensure that there is enough capacity online in the system to account for the increasedmore » variability and uncertainty occurring at finer temporal resolutions. A new operating reserve strategy, referred to as flexibility reserve, has been introduced in some regions. A similar implementation is explored in this paper, and its implications on power system operations are analyzed.« less
[Operating Room Nurses' Experiences of Securing for Patient Safety].
Park, Kwang Ok; Kim, Jong Kyung; Kim, Myoung Sook
2015-10-01
This study was done to evaluate the experience of securing patient safety in hospital operating rooms. Experiential data were collected from 15 operating room nurses through in-depth interviews. The main question was "Could you describe your experience with patient safety in the operating room?". Qualitative data from the field and transcribed notes were analyzed using Strauss and Corbin's grounded theory methodology. The core category of experience with patient safety in the operating room was 'trying to maintain principles of patient safety during high-risk surgical procedures'. The participants used two interactional strategies: 'attempt continuous improvement', 'immersion in operation with sharing issues of patient safety'. The results indicate that the important factors for ensuring the safety of patients in the operating room are manpower, education, and a system for patient safety. Successful and safe surgery requires communication, teamwork and recognition of the importance of patient safety by the surgical team.
2013-12-13
CAPE CANAVERAL, Fla. – The United Launch Alliance Centaur second stage that will help boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft into orbit is being transported from the hangar at the Atlas Spaceflight Operations Center on Cape Canaveral Air Force Station to Launch Complex 41. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/Charisse Nahser
2013-11-01
CAPE CANAVERAL, Fla. – The United Launch Alliance Atlas V launch vehicle that will boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft into orbit arrives at the Atlas Spaceflight Operations Center on Cape Canaveral Air Force Station for checkout in preparation for launch. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/ Jim Grossman
2013-12-12
CAPE CANAVERAL, Fla. – The United Launch Alliance Atlas V first stage booster that will boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft into orbit is being transported from the hangar at the Atlas Spaceflight Operations Center on Cape Canaveral Air Force Station to Launch Complex 41. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/Kim Shiflett
2013-11-01
CAPE CANAVERAL, Fla. – The United Launch Alliance Atlas V launch vehicle that will boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft into orbit arrives at the Atlas Spaceflight Operations Center on Cape Canaveral Air Force Station for checkout in preparation for launch. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/ Jim Grossman
2013-12-13
CAPE CANAVERAL, Fla. – The United Launch Alliance Centaur second stage that will help boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft into orbit is being transported from the hangar at the Atlas Spaceflight Operations Center on Cape Canaveral Air Force Station to Launch Complex 41. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/Charisse Nahser
2013-11-01
CAPE CANAVERAL, Fla. – The United Launch Alliance Centaur upper stage that will boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft into orbit is being transported to the hangar at the Atlas Spaceflight Operations Center on Cape Canaveral Air Force Station for checkout in preparation for launch. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/ Jim Grossman
2013-11-01
CAPE CANAVERAL, Fla. – The United Launch Alliance Atlas V launch vehicle that will boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft into orbit arrives at the Atlas Spaceflight Operations Center on Cape Canaveral Air Force Station for checkout in preparation for launch. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/ Jim Grossman
2013-12-12
CAPE CANAVERAL, Fla. – The United Launch Alliance Atlas V first stage booster that will boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft into orbit is being transported from the hangar at the Atlas Spaceflight Operations Center on Cape Canaveral Air Force Station to Launch Complex 41. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/Kim Shiflett
2013-11-01
CAPE CANAVERAL, Fla. – The United Launch Alliance Atlas V launch vehicle that will boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft into orbit is being transported to the hangar at the Atlas Spaceflight Operations Center on Cape Canaveral Air Force Station for checkout in preparation for launch. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/ Jim Grossman
2013-12-12
CAPE CANAVERAL, Fla. – The United Launch Alliance Atlas V first stage booster that will boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft into orbit is being transported from the hangar at the Atlas Spaceflight Operations Center on Cape Canaveral Air Force Station to Launch Complex 41. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/Kim Shiflett
2013-11-01
CAPE CANAVERAL, Fla. – The United Launch Alliance Atlas V launch vehicle that will boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft into orbit is being transported to the hangar at the Atlas Spaceflight Operations Center on Cape Canaveral Air Force Station for checkout in preparation for launch. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/ Jim Grossman
2013-12-13
CAPE CANAVERAL, Fla. – The United Launch Alliance Centaur second stage that will help boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft into orbit is being transported from the hangar at the Atlas Spaceflight Operations Center on Cape Canaveral Air Force Station to Launch Complex 41. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/Charisse Nahser
2013-11-01
CAPE CANAVERAL, Fla. – The United Launch Alliance Atlas V launch vehicle that will boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft into orbit is being transported to the hangar at the Atlas Spaceflight Operations Center on Cape Canaveral Air Force Station for checkout in preparation for launch. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/ Jim Grossman
2013-12-12
CAPE CANAVERAL, Fla. – The United Launch Alliance Atlas V first stage booster that will boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft into orbit is being prepared for transport from the hangar at the Atlas Spaceflight Operations Center on Cape Canaveral Air Force Station to Launch Complex 41. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/Kim Shiflett
2013-11-01
CAPE CANAVERAL, Fla. – The United Launch Alliance Atlas V launch vehicle that will boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft into orbit is being transported to the hangar at the Atlas Spaceflight Operations Center on Cape Canaveral Air Force Station for checkout in preparation for launch. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/ Jim Grossman
2013-12-12
CAPE CANAVERAL, Fla. – The United Launch Alliance Atlas V first stage booster that will boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft into orbit is being transported from the hangar at the Atlas Spaceflight Operations Center on Cape Canaveral Air Force Station to Launch Complex 41. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/Kim Shiflett
NASA Astrophysics Data System (ADS)
Arun, S.; Choudhury, Vishal; Balaswamy, V.; Supradeepa, V. R.
2018-02-01
We have demonstrated a 34 W continuous wave supercontinuum using the standard telecom fiber (SMF 28e). The supercontinuum spans over a bandwidth of 1000 nm (>1 octave) from 880nm to 1900 nm with a substantial power spectral density of >1mW/nm from 880-1350 nm and 50-100mW/nm in 1350-1900 nm. The distributed feedback Raman laser architecture was used for pumping the supercontinuum which ensured high efficiency Raman conversions and helped in achieving a very high efficiency of 44% for supercontinuum generation. Using this architecture, Yb laser operating at any wavelength can be used for generating the supercontinuum and this was demonstrated by using two different Yb lasers operating at 1117nm and 1085 nm to pump the supercontinuum.
NASA Technical Reports Server (NTRS)
Dugala, Gina M.
2009-01-01
The U.S. Department of Energy (DOE), Lockheed Martin Space Company (LMSC), Sun power Inc., and NASA Glenn Research Center (GRC) have been developing an Advanced Stirling Radioisotope Generator (ASRG) for use as a power system on space science missions. This generator will make use of free-piston Stirling convertors to achieve higher conversion efficiency than currently available alternatives. NASA GRC's support of ASRG development includes extended operation testing of Advanced Stirling Convertors (ASCs) developed by Sunpower Inc. In the past year, NASA GRC has been building a test facility to support extended operation of a pair of engineering level ASCs. Operation of the convertors in the test facility provides convertor performance data over an extended period of time. Mechanical support hardware, data acquisition software, and an instrumentation rack were developed to prepare the pair of convertors for continuous extended operation. Short-term tests were performed to gather baseline performance data before extended operation was initiated. These tests included workmanship vibration, insulation thermal loss characterization, low-temperature checkout, and fUll-power operation. Hardware and software features are implemented to ensure reliability of support systems. This paper discusses the mechanical support hardware, instrumentation rack, data acquisition software, short-term tests, and safety features designed to support continuous unattended operation of a pair of ASCs.
NASA Astrophysics Data System (ADS)
Sudhakar, N.; Rajasekar, N.; Akhil, Saya; Jyotheeswara Reddy, K.
2017-11-01
The boost converter is the most desirable DC-DC power converter for renewable energy applications for its favorable continuous input current characteristics. In other hand, these DC-DC converters known as practical nonlinear systems are prone to several types of nonlinear phenomena including bifurcation, quasiperiodicity, intermittency and chaos. These undesirable effects has to be controlled for maintaining normal periodic operation of the converter and to ensure the stability. This paper presents an effective solution to control the chaos in solar fed DC-DC boost converter since the converter experiences wide range of input power variation which leads to chaotic phenomena. Controlling of chaos is significantly achieved using optimal circuit parameters obtained through Nelder-Mead Enhanced Bacterial Foraging Optimization Algorithm. The optimization renders the suitable parameters in minimum computational time. The results are compared with the traditional methods. The obtained results of the proposed system ensures the operation of the converter within the controllable region.
Chapter 5, "License Renewal and Aging Management for Continued Service
DOE Office of Scientific and Technical Information (OSTI.GOV)
Naus, Dan J
As of August 2011, there were 104 commercial nuclear power reactors licensed to operate in 31 states in the United States. Initial operating licenses in the United States are granted for a period of 40 years. In order to help assure an adequate energy supply, the USNRC has established a timely license renewal process and clear requirements that are needed to ensure safe plant operation for an extended plant life. The principals of license renewal and the basic requirements that address license renewal are identified as well as additional sources of guidance that can be utilized as part of themore » license renewal process. Aging management program inspections and operating experience related to the concrete and steel containment structures are provided. Finally, several lessons learned are provided based on containment operating experience.« less
2011-09-01
Testing Input electrodes consisting of 1/2” diameter, 6” long copper rods were wired to separate conductors of a shielded, commercially available...underwater-rated electrical cable (three-conductor, shielded, shipboard cable (TSS-2), 18 American Wire Gauge (AWG) stranded copper ). Electrode pairs...sandpaper prior to use to ensure the best electrical continuity between the water and electrode by removing any copper oxide. This electrode
241-AY Double Shell Tanks (DST) Integrity Assessment Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
JENSEN, C.E.
1999-09-21
This report presents the results of the integrity assessment of the 241-AY double-shell tank farm facility located in the 200 East Area of the Hanford Site. The assessment included the design evaluation and integrity examinations of the tanks and concluded that the facility is adequately designed, is compatible with the waste, and is fit for use. Recommendations including subsequent examinations. are made to ensure the continued safe operation of the tanks.
Nutrition in peri-operative esophageal cancer management.
Steenhagen, Elles; van Vulpen, Jonna K; van Hillegersberg, Richard; May, Anne M; Siersema, Peter D
2017-07-01
Nutritional status and dietary intake are increasingly recognized as essential areas in esophageal cancer management. Nutritional management of esophageal cancer is a continuously evolving field and comprises an interesting area for scientific research. Areas covered: This review encompasses the current literature on nutrition in the pre-operative, peri-operative, and post-operative phases of esophageal cancer. Both established interventions and potential novel targets for nutritional management are discussed. Expert commentary: To ensure an optimal pre-operative status and to reduce peri-operative complications, it is key to assess nutritional status in all pre-operative esophageal cancer patients and to apply nutritional interventions accordingly. Since esophagectomy results in a permanent anatomical change, a special focus on nutritional strategies is needed in the post-operative phase, including early initiation of enteral feeding, nutritional interventions for post-operative complications, and attention to long-term nutritional intake and status. Nutritional aspects of pre-optimization and peri-operative management should be incorporated in novel Enhanced Recovery After Surgery programs for esophageal cancer.
Cassini Maneuver Experience for the Fourth Year of the Solstice Mission
NASA Technical Reports Server (NTRS)
Vaquero, Mar; Hahn, Yungsun; Stumpf, Paul; Valerino, Powtawche; Wagner, Sean; Wong, Mau
2014-01-01
After sixteen years of successful mission operations and invaluable scientific discoveries, the Cassini orbiter continues to tour Saturn on the most complex gravity-assist trajectory ever flown. To ensure that the end-of-mission target of September 2017 is achieved, propellant preservation is highly prioritized over maneuver cycle minimization. Thus, the maneuver decision process, which includes determining whether a maneuver is performed or canceled, designing a targeting strategy and selecting the engine for execution, is being continuously re-evaluated. This paper summarizes the maneuver experience throughout the fourth year of the Solstice Mission highlighting 27 maneuvers targeted to nine Titan flybys.
End-to-end operations at the National Radio Astronomy Observatory
NASA Astrophysics Data System (ADS)
Radziwill, Nicole M.
2008-07-01
In 2006 NRAO launched a formal organization, the Office of End to End Operations (OEO), to broaden access to its instruments (VLA/EVLA, VLBA, GBT and ALMA) in the most cost-effective ways possible. The VLA, VLBA and GBT are mature instruments, and the EVLA and ALMA are currently under construction, which presents unique challenges for integrating software across the Observatory. This article 1) provides a survey of the new developments over the past year, and those planned for the next year, 2) describes the business model used to deliver many of these services, and 3) discusses the management models being applied to ensure continuous innovation in operations, while preserving the flexibility and autonomy of telescope software development groups.
2013-11-01
CAPE CANAVERAL, Fla. – The United Launch Alliance Atlas V launch vehicle, left, and Centaur upper stage that will boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft into orbit is being transported to the hangar at the Atlas Spaceflight Operations Center on Cape Canaveral Air Force Station for checkout in preparation for launch. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/ Jim Grossman
2013-12-13
CAPE CANAVERAL, Fla. – At Cape Canaveral Air Force Station, engineers and technicians support lifting the first stage of the United Launch Alliance Atlas V rocket during stacking operations in the Vertical Integration Facility at Launch Complex 41. The vehicle will be used to boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft to orbit. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/Charisse Nahser
2013-12-13
CAPE CANAVERAL, Fla. – At Cape Canaveral Air Force Station, a technician support lifting the first stage of the United Launch Alliance Atlas V rocket during stacking operations in the Vertical Integration Facility at Launch Complex 41. The vehicle will be used to boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft to orbit. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/Charisse Nahser
2013-12-13
CAPE CANAVERAL, Fla. – At Cape Canaveral Air Force Station, engineers and technicians support lifting the first stage of the United Launch Alliance Atlas V rocket during stacking operations in the Vertical Integration Facility at Launch Complex 41. The vehicle will be used to boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft to orbit. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/Charisse Nahser
2013-11-01
PORT CANAVERAL, Fla. – Following arrival at Port Canaveral, Fla., the United Launch Alliance Atlas V first stage and Centaur upper stage that will boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft into orbit is being transported to Cape Canaveral Air Force Station's Atlas Spaceflight Operations Center for checkout in preparation for launch. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/ Kim Shiflett
2013-12-13
CAPE CANAVERAL, Fla. – At Cape Canaveral Air Force Station, engineers and technicians support lifting the first stage of the United Launch Alliance Atlas V rocket during stacking operations in the Vertical Integration Facility at Launch Complex 41. The vehicle will be used to boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft to orbit. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/Charisse Nahser
2013-11-01
PORT CANAVERAL, Fla. – Following arrival at Port Canaveral, Fla., the United Launch Alliance Atlas V first stage and Centaur upper stage that will boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft into orbit is being transported to Cape Canaveral Air Force Station's Atlas Spaceflight Operations Center for checkout in preparation for launch. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/ Kim Shiflett
Chekov, Iu F
2009-01-01
The author describes a zeolite system for carbon dioxide removal integrated into a closed air regeneration cycle aboard spacecraft. The continuous operation of a double-adsorbent regeneration system with pCO2-dependable productivity is maintained through programmable setting of adsorption (desorption) semicycle time. The optimal system regulation curve is presented within the space of statistical performance family obtained in quasi-steady operating modes with controlled parameters of the recurrent adsorption-desorption cycle. The automatically changing system productivity ensures continuous intake of concentrated CO2. Control of the adsorption-desorption process is based on calculation of the differential adsorption (desorption) heat from gradient of adsorbent and test inert substance temperatures. The adaptive algorithm of digital control is implemented through the standard spacecraft interface with the board computer system and programmable microprocessor-based controllers.
Applying Culture to Military Operations: A Review of Foreign Militaries
2012-04-04
with foreign cultures.29 This gap was addressed by the Australian Defence Force’s 39th Personnel Support Battalion ( PSB ) when they began offering...Force Preparation Training to military service members as well as government civilians in advance of deployment.30 In 2010, the 39th PSB determined...to ensure that the training “will continually evolve.” 31 In August of 2011, the 39th PSB began offering a two-part training package. The
Continuity of Operations Plans: Policy and Strategy for K-12 Schools in the State of Florida
2011-12-01
issue that has emerged, as it concerns COOP, involves the need for Florida K-12 school systems to develop these plans. Florida neither requires, as is...test COOPs to ensure functional and recovery capabilities. Issues , such as alternate facilities, computer and informational services, as well as human...policy and strategy components for K-12 schools. D. HYPOTHESIS Within the communities of government, universities and businesses , a COOP has
Continuous real-time water information: an important Kansas resource
Loving, Brian L.; Putnam, James E.; Turk, Donita M.
2014-01-01
Continuous real-time information on streams, lakes, and groundwater is an important Kansas resource that can safeguard lives and property, and ensure adequate water resources for a healthy State economy. The U.S. Geological Survey (USGS) operates approximately 230 water-monitoring stations at Kansas streams, lakes, and groundwater sites. Most of these stations are funded cooperatively in partnerships with local, tribal, State, or other Federal agencies. The USGS real-time water-monitoring network provides long-term, accurate, and objective information that meets the needs of many customers. Whether the customer is a water-management or water-quality agency, an emergency planner, a power or navigational official, a farmer, a canoeist, or a fisherman, all can benefit from the continuous real-time water information gathered by the USGS.
The hexagon hypothesis: Six disruptive scenarios.
Burtles, Jim
2015-01-01
This paper aims to bring a simple but effective and comprehensive approach to the development, delivery and monitoring of business continuity solutions. To ensure that the arguments and principles apply across the board, the paper sticks to basic underlying concepts rather than sophisticated interpretations. First, the paper explores what exactly people are defending themselves against. Secondly, the paper looks at how defences should be set up. Disruptive events tend to unfold in phases, each of which invites a particular style of protection, ranging from risk management through to business continuity to insurance cover. Their impact upon any business operation will fall into one of six basic scenarios. The hexagon hypothesis suggests that everyone should be prepared to deal with each of these six disruptive scenarios and it provides them with a useful benchmark for business continuity.
NASA Technical Reports Server (NTRS)
Chien, Steve; Knight, Russell; Stechert, Andre; Sherwood, Rob; Rabideau, Gregg
1998-01-01
An autonomous spacecraft must balance long-term and short-term considerations. It must perform purposeful activities that ensure long-term science and engineering goals are achieved and ensure that it maintains positive resource margins. This requires planning in advance to avoid a series of shortsighted decisions that can lead to failure, However, it must also respond in a timely fashion to a somewhat dynamic and unpredictable environment. Thus, spacecraft plans must often be modified due to fortuitous events such as early completion of observations and setbacks such as failure to acquire a guidestar for a science observation. This paper describes the use of iterative repair to support continuous modification and updating of a current working plan in light of changing operating context.
NASA Technical Reports Server (NTRS)
Kopardekar, Parimal H.
2016-01-01
Unmanned Aircraft System (UAS) Traffic Management (UTM) Enabling Civilian Low-Altitude Airspace and Unmanned Aircraft System Operations What is the problem? Many beneficial civilian applications of UAS have been proposed, from goods delivery and infrastructure surveillance, to search and rescue, and agricultural monitoring. Currently, there is no established infrastructure to enable and safely manage the widespread use of low-altitude airspace and UAS operations, regardless of the type of UAS. A UAS traffic management (UTM) system for low-altitude airspace may be needed, perhaps leveraging concepts from the system of roads, lanes, stop signs, rules and lights that govern vehicles on the ground today, whether the vehicles are driven by humans or are automated. What system technologies is NASA exploring? Building on its legacy of work in air traffic management for crewed aircraft, NASA is researching prototype technologies for a UAS Traffic Management (UTM) system that could develop airspace integration requirements for enabling safe, efficient low-altitude operations. While incorporating lessons learned from the today's well-established air traffic management system, which was a response that grew out of a mid-air collision over the Grand Canyon in the early days of commercial aviation, the UTM system would enable safe and efficient low-altitude airspace operations by providing services such as airspace design, corridors, dynamic geofencing, severe weather and wind avoidance, congestion management, terrain avoidance, route planning and re-routing, separation management, sequencing and spacing, and contingency management. One of the attributes of the UTM system is that it would not require human operators to monitor every vehicle continuously. The system could provide to human managers the data to make strategic decisions related to initiation, continuation, and termination of airspace operations. This approach would ensure that only authenticated UAS could operate in the airspace. In its most mature form, the UTM system could be developed using autonomicity characteristics that include self-configuration, self-optimization and self-protection. The self-configuration aspect could determine whether the operations should continue given the current andor predicted windweather conditions. NASA envisions concepts for two types of possible UTM systems. The first type would be a Portable UTM system, which would move from between geographical areas and support operations such as precision agriculture and disaster relief. The second type of system would be a Persistent UTM system, which would support low-altitude operations and provide continuous coverage for a geographical area. Either system would require persistent communication, navigation, and surveillance (CNS) coverage to track, ensure, and monitor conformance. What is NASA doing to test the technologies? NASA's near-term goal is the development and demonstration of a possible future UTM system that could safely enable low-altitude airspace and UAS operations. Working alongside many committed government, industry and academic partners, NASA is leading the research, development and testing that is taking place in a series of activities called Technology Capability Levels (TCL), each increasing in complexity. UTM TCL1 concluded field testing in August 2015 and is undergoing additional testing at an FAA site.
NASA Technical Reports Server (NTRS)
Eppler, Dean B.
2013-01-01
The scientific success of any future human lunar exploration mission will be strongly dependent on design of both the systems and operations practices that underpin crew operations on the lunar surface. Inept surface mission preparation and design will either ensure poor science return, or will make achieving quality science operation unacceptably difficult for the crew and the mission operations and science teams. In particular, ensuring a robust system for managing real-time science information flow during surface operations, and ensuring the crews receive extensive field training in geological sciences, are as critical to mission success as reliable spacecraft and a competent operations team.
Dispatchable hydrogen production at the forecourt for electricity grid balancing
NASA Astrophysics Data System (ADS)
Rahil, Abdulla; Gammon, Rupert; Brown, Neil
2017-02-01
The rapid growth of renewable energy (RE) generation and its integration into electricity grids has been motivated by environmental issues and the depletion of fossil fuels. For the same reasons, an alternative to hydrocarbon fuels is needed for vehicles; hence the anticipated uptake of electric and fuel cell vehicles. High penetrations of RE generators with variable and intermittent output threaten to destabilise electricity networks by reducing the ability to balance electricity supply and demand. This can be greatly mitigated by the use of energy storage and demand-side response (DSR) techniques. Hydrogen production by electrolysis is a promising option for providing DSR as well as an emission-free vehicle fuel. Tariff structures can be used to incentivise the operating of electrolysers as controllable (dispatchable) loads. This paper compares the cost of hydrogen production by electrolysis at garage forecourts under both dispatchable and continuous operation, while ensuring no interruption of fuel supply to fuel cell vehicles. An optimisation algorithm is applied to investigate a hydrogen refueling station in both dispatchable and continuous operation. Three scenarios are tested to see whether a reduced off-peak electricity price could lower the cost of electrolytic hydrogen. These scenarios are: 1) "Standard Continuous", where the electrolyser is operated continuously on a standard all-day tariff of 12p/kWh; 2) "Off-peak Only", where it runs only during off-peak periods in a 2-tier tariff system at the lower price of 5p/kWh; and 3) "2-Tier Continuous", operating continuously and paying a low tariff at off- peak times and a high tariff at other times. This study uses the Libyan coastal city of Derna as a case study. The cheapest electricity cost per kg of hydrogen produced was £2.8, which occurred in Scenario 2. The next cheapest, at £5.8 - £6.3, was in Scenario 3, and the most expensive was £6.8/kg in Scenario 1.
Physiotherapy in upper abdominal surgery - what is current practice in Australia?
Patman, Shane; Bartley, Alice; Ferraz, Allex; Bunting, Cath
2017-01-01
Upper abdominal surgery (UAS) has the potential to cause post-operative pulmonary complications (PPCs). In the absence of high-quality research regarding post-operative physiotherapy management, consensus-based best practice guidelines formulated by Hanekom et al. (2012) are available to clinicians providing recommendations for post-UAS treatment. Such best practice guidelines have recommended that physiotherapists should be using early mobilisation and respiratory intervention to minimise risk of PPCs. However, recent evidence supports the implementation of mobilisation as a standalone treatment in PPC prevention, though the diversity in literature poses questions regarding ideal current practice. This project aimed to document and report the assessment measures and interventions physiotherapists are utilising following UAS, establishing whether current management is reflective of best practice guidelines and recent evidence. An online survey was completed by 57 experienced Australian physiotherapists working with patients following UAS (35% survey response rate, 63% completion rate). On day one following UAS, when a patient's condition is not medically limited, most physiotherapists routinely mobilise. Additionally, routine chest treatment continues to be implemented, with only 23% ( n = 11/47) of physiotherapists mobilising patients without accompanying specific respiratory intervention. Variability of screening tools used to identify post-operative patients at high risk of PPC development was evident. Patient-dependent factors such as 'fatigue' and 'non-compliance' were among those identified as barriers to treatment, all influencing the commencement of treatment. Physiotherapists indicated that early mobilisation away from the bedside was the preferred post-operative treatment within the UAS patient population. Many continue to perform routine respiratory interventions despite recent literature suggesting it may provide no additional benefit to preventing PPCs. Current intervention choice is reflective of guidelines [1], however, recent literature has called this into question and more research needs to be done to establish if these recommendations are the most effective at reducing PPCs. Continued research is necessary to promote translation of knowledge to ensure physiotherapists are mobilising patients day one post-UAS. Likewise, future work should focus on identification of barriers, the strategies used to overcome limitations and the creation of a reliable and validated screening tool to ensure appropriate prioritisation and allocation of physiotherapy resources within the UAS patient population.
The end-stage renal disease industry and exit strategies for nephrologists.
Sullivan, John D
2006-01-01
The purpose of this presentation is to identify exit strategies for nephrologists under changing conditions in the dialysis market. The end-stage renal disease service provider market continues to be highly receptive to consolidation. Taking advantage of large economies of scale, large for-profit dialysis chains have surpassed independent operators in both number of clinics and total patients. With relatively low barriers to entry, new smaller clinics continue to open, serving a niche outside the larger chains. Additional competition comes in the form of medium players funded by venture capitalists with the added pressure of rapid growth and financial return. To ensure market power in both dialysis products and managed care negotiation leverage, medium and large service providers will continue to seek out attractive acquisition targets. For nephrologists to capitalize on investment, clinic and business preparation will continue to be the driving force for these divestitures.
Sullivan, Joe
2017-01-01
Mobile technology has changed the way we live and operate, with co-working, flexible spaces and home office solutions that offer us the freedom to work when and where we choose. However, when disaster strikes the workplace, people are often the last to be considered in the recovery process. This paper examines strategies for businesses and their employees to continue working after a disaster strikes. It explores the trends in the market, the benefits and drawbacks of different approaches and the attitudes of continuity experts and small business owners who have the responsibility to ensure that businesses, and people, continue to function, even when their main place of work is inaccessible. Informed by expertise and experience, this paper also draws on the extant literature, as well as bespoke research targeted at both continuity professionals and business decision-makers, to discover more about attitudes to disaster recovery.
Continuity planning for workplace infectious diseases.
Welch, Nancy; Miller, Pamela Blair; Engle, Lisa
2016-01-01
Traditionally, business continuity plans prepare for worst-case scenarios; people plan for the exception rather than the common. Plans focus on infrastructure damage and recovery wrought by such disasters as hurricanes, terrorist events or tornadoes. Yet, another very real threat looms present every day, every season and can strike without warning, wreaking havoc on the major asset -- human capital. Each year, millions of dollars are lost in productivity, healthcare costs, absenteeism and services due to infectious, communicable diseases. Sound preventive risk management and recovery strategies can avert this annual decimation of staff and ensure continuous business operation. This paper will present a strong economic justification for the recognition, prevention and mitigation of communicable diseases as a routine part of continuity planning for every business. Recommendations will also be provided for environmental/engineering controls as well as personnel policies that address employee and customer protection, supply chain contacts and potential legal issues.
Specificity of Good Manufacturing Practice (GMP) for Biomedical Cell Products.
Tulina, M A; Pyatigorskaya, N V
2018-03-01
The article describes special aspects of Good Manufacturing Practice (GMP) for biomedical cell products (BMCP) that imply high standards of aseptics throughout the entire productio process, strict requirements to donors and to the procedure of biomaterial isolation, guaranty of tracing BMCP products, defining processing procedures which allow to identify BMCP as minimally manipulated; continuous quality control and automation of the control process at all stages of manufacturing, which will ensure product release simultaneously with completion of technological operations.
Viable Short-Term Directed Energy Weapon Naval Solutions: A Systems Analysis of Current Prototypes
2013-06-01
Background and Issues for Congress 2013). The current DDG-51 electrical plant consists of three Gas Turbine Generator Sets ( GTGs ) rated at 2500 kW each...the generator rating (currently 2500kW), the practice is to have a minimum of two GTGs on line at all times to ensure continuity of service should...there be a system fault, or casualty to one of the GTGs (Mahoney, et al. 2010). This operation of at least two generators at all times essentially
VVER Reactor Safety in Eastern Europe and Former Soviet Union
NASA Astrophysics Data System (ADS)
Papadopoulou, Demetra
2012-02-01
VVER Soviet-designed reactors that operate in Eastern Europe and former Soviet republics have heightened international concern for years due to major safety deficiencies. The governments of countries with VVER reactors have invested millions of dollars toward improving the safety of their nuclear power plants. Most of these reactors will continue to operate for the foreseeable future since they provide urgently-needed electrical power. Given this situation, this paper assesses the radiological consequences of a major nuclear accident in Eastern Europe. The paper also chronicles the efforts launched by the international nuclear community to improve the safety of the reactors and notes the progress made so far through extensive collaborative efforts in Armenia, Bulgaria, the Czech Republic, Hungary, Kazakhstan, Lithuania, Russia, Slovakia, and Ukraine to reduce the risks of nuclear accidents. Western scientific and technical staff collaborated with these countries to improve the safety of their reactor operations by strengthening the ability of the regulator to perform its oversight function, installing safety equipment and technologies, investing time in safety training, and working diligently to establish an enduring safety culture. Still, continued safety improvement efforts are necessary to ensure safe operating practices and achieve timely phase-out of older plants.
Processing and Preparation of Advanced Stirling Convertors for Extended Operation
NASA Technical Reports Server (NTRS)
Oriti, Salvatore M.; Cornell, Paggy A.
2008-01-01
The U.S. Department of Energy (DOE), Lockheed Martin Space Company (LMSC), Sunpower Inc., and NASA Glenn Research Center (GRC) have been developing an Advanced Stirling Radioisotope Generator (ASRG) for use as a power system on space science missions. This generator will make use of the free-piston Stirling convertors to achieve higher conversion efficiency than currently available alternatives. NASA GRC is supporting the development of the ASRG by providing extended operation of several Sunpower Inc. Advanced Stirling Convertors (ASCs). In the past year and a half, eight ASCs have operated in continuous, unattended mode in both air and thermal vacuum environments. Hardware, software, and procedures were developed to prepare each convertor for extended operation with intended durations on the order of tens of thousands of hours. Steps taken to prepare a convertor for long-term operation included geometry measurements, thermocouple instrumentation, evaluation of working fluid purity, evacuation with bakeout, and high purity charge. Actions were also taken to ensure the reliability of support systems, such as data acquisition and automated shutdown checkouts. Once a convertor completed these steps, it underwent short-term testing to gather baseline performance data before initiating extended operation. These tests included insulation thermal loss characterization, low-temperature checkout, and full-temperature and power demonstration. This paper discusses the facilities developed to support continuous, unattended operation, and the processing results of the eight ASCs currently on test.
NASA Technical Reports Server (NTRS)
Oriti, Salvatore M.; Cornell, Peggy A.
2008-01-01
The U.S. Department of Energy (DOE), Lockheed Martin Space Company (LMSC), Sunpower Inc., and NASA Glenn Research Center (GRC) have been developing an Advanced Stirling Radioisotope Generator (ASRG) for use as a power system on space science missions. This generator will make use of the free-piston Stirling convertors to achieve higher conversion efficiency than currently available alternatives. NASA GRC is supporting the development of the ASRG by providing extended operation of several Sunpower Inc. Advanced Stirling Convertors (ASCs). In the past year and a half, eight ASCs have operated in continuous, unattended mode in both air and thermal vacuum environments. Hardware, software, and procedures were developed to prepare each convertor for extended operation with intended durations on the order of tens of thousands of hours. Steps taken to prepare a convertor for long-term operation included geometry measurements, thermocouple instrumentation, evaluation of working fluid purity, evacuation with bakeout, and high purity charge. Actions were also taken to ensure the reliability of support systems, such as data acquisition and automated shutdown checkouts. Once a convertor completed these steps, it underwent short-term testing to gather baseline performance data before initiating extended operation. These tests included insulation thermal loss characterization, low-temperature checkout, and full-temperature and power demonstration. This paper discusses the facilities developed to support continuous, unattended operation, and the processing results of the eight ASCs currently on test.
Centralized mission planning and scheduling system for the Landsat Data Continuity Mission
Kavelaars, Alicia; Barnoy, Assaf M.; Gregory, Shawna; Garcia, Gonzalo; Talon, Cesar; Greer, Gregory; Williams, Jason; Dulski, Vicki
2014-01-01
Satellites in Low Earth Orbit provide missions with closer range for studying aspects such as geography and topography, but often require efficient utilization of space and ground assets. Optimizing schedules for these satellites amounts to a complex planning puzzle since it requires operators to face issues such as discontinuous ground contacts, limited onboard memory storage, constrained downlink margin, and shared ground antenna resources. To solve this issue for the Landsat Data Continuity Mission (LDCM, Landsat 8), all the scheduling exchanges for science data request, ground/space station contact, and spacecraft maintenance and control will be coordinated through a centralized Mission Planning and Scheduling (MPS) engine, based upon GMV’s scheduling system flexplan9 . The synchronization between all operational functions must be strictly maintained to ensure efficient mission utilization of ground and spacecraft activities while working within the bounds of the space and ground resources, such as Solid State Recorder (SSR) and available antennas. This paper outlines the functionalities that the centralized planning and scheduling system has in its operational control and management of the Landsat 8 spacecraft.
Informatics in radiology (infoRAD): A complete continuous-availability PACS archive server.
Liu, Brent J; Huang, H K; Cao, Fei; Zhou, Michael Z; Zhang, Jianguo; Mogel, Greg
2004-01-01
The operational reliability of the picture archiving and communication system (PACS) server in a filmless hospital environment is always a major concern because server failure could cripple the entire PACS operation. A simple, low-cost, continuous-availability (CA) PACS archive server was designed and developed. The server makes use of a triple modular redundancy (TMR) system with a simple majority voting logic that automatically identifies a faulty module and removes it from service. The remaining two modules continue normal operation with no adverse effects on data flow or system performance. In addition, the server is integrated with two external mass storage devices for short- and long-term storage. Evaluation and testing of the server were conducted with laboratory experiments in which hardware failures were simulated to observe recovery time and the resumption of normal data flow. The server provides maximum uptime (99.999%) for end users while ensuring the transactional integrity of all clinical PACS data. Hardware failure has only minimal impact on performance, with no interruption of clinical data flow or loss of data. As hospital PACS become more widespread, the need for CA PACS solutions will increase. A TMR CA PACS archive server can reliably help achieve CA in this setting. Copyright RSNA, 2004
NASA Astrophysics Data System (ADS)
Catherall, R.; Andreazza, W.; Breitenfeldt, M.; Dorsival, A.; Focker, G. J.; Gharsa, T. P.; J, Giles T.; Grenard, J.-L.; Locci, F.; Martins, P.; Marzari, S.; Schipper, J.; Shornikov, A.; Stora, T.
2017-09-01
The ISOLDE facility has undergone numerous changes over the last 17 years driven by both the physics and technical community with a common goal to improve on beam variety, beam quality and safety. Improvements have been made in civil engineering and operational equipment while continuing developments aim to ensure operations following a potential increase in primary beam intensity and energy. This paper outlines the principal technical changes incurred at ISOLDE by building on a similar publication of the facility upgrades by Kugler (2000 Hyperfine Interact. 129 23-42). It also provides an insight into future perspectives through a brief summary issues addressed in the HIE-ISOLDE design study Catherall et al (2013 Nucl. Instrum. Methods Phys. Res. B 317 204-207).
DOE Office of Scientific and Technical Information (OSTI.GOV)
Crandall, R.S.; Nelson, B.P.; Moskowitz, P.D.
1992-07-01
To ensure the continued safety of SERI`s employees, the community, and the environment, NREL commissioned an internal audit of its photovoltaic operations that used hazardous production materials (HPMS). As a result of this audit, NREL management voluntarily suspended all operations using toxic and/or pyrophoric gases. This suspension affected seven laboratories and ten individual deposition systems. These activities are located in Building 16, which has a permitted occupancy of Group B, Division 2 (B-2). NREL management decided to do the following. (1) Exclude from this SAR all operations which conformed, or could easily be made to conform, to B-2 Occupancy requirements.more » (2) Include in this SAR all operations that could be made to conform to B-2 Occupancy requirements with special administrative and engineering controls. (3) Move all operations that could not practically be made to conform to B-2 occupancy requirements to alternate locations. In addition to the layered set of administrative and engineering controls set forth in this SAR, a semiquantitative risk analysis was performed on 30 various accident scenarios. Twelve presented only routine risks, while 18 presented low risks. Considering the demonstrated safe operating history of NREL in general and these systems specifically, the nature of the risks identified, and the layered set of administrative and engineering controls, it is clear that this facility falls within the DOE Low Hazard Class. Each operation can restart only after it has passed an Operational Readiness Review, comparing it to the requirements of this SAR, while subsequent safety inspections will ensure future compliance. This document contains the appendices to the NREL safety analysis report.« less
The Landsat 7 mission: terrestrial research and applications for the 21st century
Goward, Samuel N.; Masek, Jeffrey G.; Williams, Darrel L.; Irons, James R.; Thompson, R.J.
2001-01-01
The Landsat Earth observation approach introduced in 1972 created a new way of monitoring land cover and land use globally. The Landsat 7 mission, successfully launched on April 15, 1999, continues those observations and demonstrates significant progress in precise numerical radiometry, spectral differentiation, and seasonally repetitive monitoring. Substantial improvements in calibration procedures, both prior to launch and during normal operations, have also been made to ensure long-term stability in the acquired spectral radiometry. Landsat 7 data acquisitions are being driven by a long-term data acquisition plan that was designed to ensure that substantially cloud-free, seasonal coverage would be recorded and archived in the US for all land areas of the globe. NASA competitively selected a Landsat Science Team, consisting of representatives from US universities and government agencies, to exploit the Landsat 7 record for global change research. This team is addressing the technical and analytical means to process and analyze the core of this observation record, and for the first time in the history of the Landsat mission, the technical and operational aspects of the mission are being driven by the goals of the US science community. The expected outcome of these efforts is a rapid improvement in understanding the Earth system, as well as conceptual knowledge that will underpin significant advancements in the application of this technology for commercial, operational, educational, and research purposes. Pathways to achieve effective Landsat continuity in the early decades of the 21st century are also being given careful attention, and there is no question that the lessons learned from the Landsat 7 mission will strongly influence these next-generation sensor systems.
Mini-Ckpts: Surviving OS Failures in Persistent Memory
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fiala, David; Mueller, Frank; Ferreira, Kurt Brian
Concern is growing in the high-performance computing (HPC) community on the reliability of future extreme-scale systems. Current efforts have focused on application fault-tolerance rather than the operating system (OS), despite the fact that recent studies have suggested that failures in OS memory are more likely. The OS is critical to a system's correct and efficient operation of the node and processes it governs -- and in HPC also for any other nodes a parallelized application runs on and communicates with: Any single node failure generally forces all processes of this application to terminate due to tight communication in HPC. Therefore,more » the OS itself must be capable of tolerating failures. In this work, we introduce mini-ckpts, a framework which enables application survival despite the occurrence of a fatal OS failure or crash. Mini-ckpts achieves this tolerance by ensuring that the critical data describing a process is preserved in persistent memory prior to the failure. Following the failure, the OS is rejuvenated via a warm reboot and the application continues execution effectively making the failure and restart transparent. The mini-ckpts rejuvenation and recovery process is measured to take between three to six seconds and has a failure-free overhead of between 3-5% for a number of key HPC workloads. In contrast to current fault-tolerance methods, this work ensures that the operating and runtime system can continue in the presence of faults. This is a much finer-grained and dynamic method of fault-tolerance than the current, coarse-grained, application-centric methods. Handling faults at this level has the potential to greatly reduce overheads and enables mitigation of additional fault scenarios.« less
Inland Waterway Environmental Safety
NASA Astrophysics Data System (ADS)
Reshnyak, Valery; Sokolov, Sergey; Nyrkov, Anatoliy; Budnik, Vlad
2018-05-01
The article presents the results of development of the main components of the environmental safety when operating vessels on inland waterways, which include strategy selection ensuring the environmental safety of vessels, the selection and justification of a complex of environmental technical means, activities to ensure operation of vessels taking into account the environmental technical means. Measures to ensure environmental safety are developed on the basis of the principles aimed at ensuring environmental safety of vessels. They include the development of strategies for the use of environmental protection equipment, which are determined by the conditions for wastewater treatment of purified sewage and oily bilge water as well as technical characteristics of the vessels, the introduction of the process of the out-of-the-vessel processing of ship pollution as a technology for their movement. This must take into account the operating conditions of vessels on different sections of waterways. An algorithm of actions aimed at ensuring ecological safety of operated vessels is proposed.
The Slow Control System of the Auger Fluorescence Detectors
NASA Astrophysics Data System (ADS)
Barenthien, N.; Bethge, C.; Daumiller, K.; Gemmeke, H.; Kampert, K.-H.; Wiebusch, C.
2003-07-01
The fluorescence detector (FD) of the Pierre Auger experiment [1] comprises 24 telescopes that will be situated in 4 remote buildings in the Pampa Amarilla. It is planned to run the fluorescence detectors in absence of operators on site. Therefore, the main task of the Slow Control System (SCS) is to ensure a secure remote operation of the FD system. The Slow Control System works autonomously and continuously monitors those parameters which may disturb a secure operation. Commands from the data-acquisition system or the remote operator are accepted only if they do not violate safety rules that depend on the actual experimental conditions (e.g. high-voltage, wind-sp eed, light, etc.). In case of malfunctions (power failure, communication breakdown, ...) the SCS performs an orderly shutdown and subsequent startup of the fluorescence detector system. The concept and the implementation of the Slow Control System are presented.
Interconnection, Integration, and Interactive Impact Analysis of Microgrids and Distribution Systems
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kang, Ning; Wang, Jianhui; Singh, Ravindra
2017-01-01
Distribution management systems (DMSs) are increasingly used by distribution system operators (DSOs) to manage the distribution grid and to monitor the status of both power imported from the transmission grid and power generated locally by a distributed energy resource (DER), to ensure that power flows and voltages along the feeders are maintained within designed limits and that appropriate measures are taken to guarantee service continuity and energy security. When microgrids are deployed and interconnected to the distribution grids, they will have an impact on the operation of the distribution grid. The challenge is to design this interconnection in such amore » way that it enhances the reliability and security of the distribution grid and the loads embedded in the microgrid, while providing economic benefits to all stakeholders, including the microgrid owner and operator and the distribution system operator.« less
Precision control of multiple quantum cascade lasers for calibration systems
DOE Office of Scientific and Technical Information (OSTI.GOV)
Taubman, Matthew S., E-mail: Matthew.Taubman@pnnl.gov; Myers, Tanya L.; Pratt, Richard M.
We present a precision, 1-A, digitally interfaced current controller for quantum cascade lasers, with demonstrated temperature coefficients for continuous and 40-kHz full-depth square-wave modulated operation, of 1–2 ppm/ °C and 15 ppm/ °C, respectively. High precision digital to analog converters (DACs) together with an ultra-precision voltage reference produce highly stable, precision voltages, which are selected by a multiplexer (MUX) chip to set output currents via a linear current regulator. The controller is operated in conjunction with a power multiplexing unit, allowing one of three lasers to be driven by the controller, while ensuring protection of controller and all lasers during operation, standby,more » and switching. Simple ASCII commands sent over a USB connection to a microprocessor located in the current controller operate both the controller (via the DACs and MUX chip) and the power multiplexer.« less
A clinical governance framework for blood services.
Williamson, L M; Benjamin, R J; Devine, D V; Katz, L M; Pink, J
2015-05-01
The elements of clinical governance, which ensure excellence in clinical care, can be applied to blood services. In this survey, their application in a range of blood providers was gauged, with the aim of identifying best practice and producing a generalizable framework. The Medical Directors of members of the Alliance of Blood Operators surveyed how different elements of clinical governance operated within their organizations and developed recommendations applicable in the blood service environment. The recommendations that emerged highlighted the importance of an organization's culture, with the delivery of optimal clinical governance being a corporate responsibility. Senior management must agree and promote a set of values to ensure that the system operates with the patient and donor at its heart. All staff should understand how their role fits into the 'journey to the patient', and a culture of openness promoted. Thus, reporting of errors and risks should be actively sought and praised, with penalties applied for concealment. Systems should exist to collect, analyse and escalate clinical outcomes, safety data, clinical risk assessments, incident reports and complaints to inform organizational learning. Clinical governance principles from general health care can be applied within blood services to complement good manufacturing practice. This requires leadership, accountability, an open culture and a drive for continuous improvement and excellence in clinical care. © 2015 International Society of Blood Transfusion.
2013-12-13
CAPE CANAVERAL, Fla. – At Cape Canaveral Air Force Station's Launch Complex 41, a United Launch Alliance Atlas V rocket, with its Centaur second stage atop, stands in the Vertical Integration Facility as preparations continue for lift off of the Tracking and Data Relay Satellite, or TDRS-L. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/Charisse Nahser
Inherently Safe and Long-Life Fission Power System for Lunar Outposts
NASA Astrophysics Data System (ADS)
Schriener, T. M.; El-Genk, Mohamed S.
Power requirements for future lunar outposts, of 10's to 100's kWe, can be fulfilled using nuclear reactor power systems. In addition to the long life and operation reliability, safety is paramount in all phases, including fabrication and assembly, launch, emplacement below grade on the lunar surface, operation, post-operation decay heat removal and long-term storage and eventual retrieval. This paper introduces the Solid Core-Sectored Compact Reactor (SC-SCoRe) and power system with static components and no single point failures. They ensure reliable continuous operation for ~21 years and fulfill the safety requirements. The SC-SCoRe nominally generates 1.0 MWth at liquid NaK-56 coolant inlet and exit temperatures of 850 K and 900 K and the power system provides 38 kWe at high DC voltage using SiGe thermoelectric (TE) conversion assemblies. In case of a loss of coolant or cooling in a reactor core sector, the power system continues to operate; generating ~4 kWe to the outpost for emergency life support needs. The post-operation storage of the reactor below grade on the lunar surface is a safe and practical choice. The total radioactivity in the reactor drops from ~1 million Ci, immediately at shutdown, to below 164 Ci after 300 years of storage. At such time, the reactor is retrieved safely with no contamination or environmental concerns.
Sentinel-1A - Launching the first satellite and launching the operational Copernicus programme
NASA Astrophysics Data System (ADS)
Aschbacher, Josef; Milagro Perez, Maria Pilar
2014-05-01
The first Copernicus satellite, Sentinel-1A, is prepared for launch in April 2014. It will provide continuous, systematic and highly reliable radar images of the Earth. Sentinel-1B will follow around 18 months later to increase observation frequency and establish an operational system. Sentinel-1 is designed to work in a pre-programmed conflict-free operation mode ensuring the reliability required by operational services and creating a consistent long-term data archive for applications based on long time series. This mission will ensure the continuation and improvement of SAR operational services and applications addressing primarily medium- to high-resolution applications through a main mode of operation that features both a wide swath (250 km) and high geometric (5 × 20 m) and radiometric resolution, allowing imaging of global landmasses, coastal zones, sea ice, polar areas, and shipping routes at high resolution. The Sentinel-1 main operational mode (Interferometric Wide Swath) will allow to have a complete coverage of the Earth in 6 days in the operational configuration when the two Sentinel-1 spacecraft will be in orbit simultaneously. High priority areas like Europe, Canada and some shipping routes will be covered almost daily. This high global observation frequency is unprecedented and cannot be reached with any other current radar mission. Envisat, for example, which was the 'workhorse' in this domain up to April 2012, reached global coverage every 35 days. Sentinel-1 data products will be made available systematically and free of charge to all users including institutional users, the general public, scientific and commercial users. The transition of the Copernicus programme from the development to operational phase will take place at about the same time when the first Sentinel-1 satellite will be launched. During the operational phase, funding of the programme will come from the European Union Multiannual Financial Framework (MFF) for the years 2014-2020. The EU Copernicus Regulation, laying down the legal basis for the EU operational Copernicus programme, is currently in its final phase of approval by the European Parliament and Council. Based on this, the future EU-ESA Copernicus Agreement will define the modalities for the cooperation between ESA and the EU for the period 2014-2020 and will regulate the budget implementation tasks entrusted to ESA by the EU for the accomplishment of the space segment and the programme operations phase. The agreement, once signed, will pave the way for important procurements over the next seven years in the Earth observation domain.
Pal, Debasis; Ghosh, Aditi; Sen, Ranjan; Pal, Atasi
2016-08-10
A continuous-wave (CW) as well as quasi-continuous wave (QCW) thulium-doped all-fiber laser at 1.94 μm has been designed for targeting applications in urology. The thulium-doped active fiber with an octagonal-shaped inner cladding is pumped at 793 nm to achieve stable CW laser power of 10 W with 32% lasing efficiency (against launched pump power). The linear variation of laser power with pump offers a scope of further power scaling. A QCW operation with variation of duty cycle from 0.5% to 90%, repetition rate from 0.1 Hz to 1 kHz, and pulse width from 40 μs to 2 s has been presented. Laser power of 9.5 W in CW mode of operation and average power of 5.2 W with energy range of 10.4-104 mJ in QCW mode of operation has been employed to fragment calcium oxalate monohydrate kidney stones (size of 1.5-4 cm) having different colors and composition. Dependence of ablation threshold, ablation rate, and average fragmented particle size on the average power and energy has been studied. One minute of laser exposure results in fragmentation of a stone surface with ablation rate of 8 mg/min having minimum particle size of 6.54 μm with an average size of 20-100 μm ensuring the natural removal of fragmented parts through the urethra.
Hossler, Patrick; McDermott, Sean; Racicot, Christopher; Fann, John C H
2013-01-01
The design of basal and feed media in mammalian cell culture is paramount towards ensuring acceptable upstream process performance in various operation modes, especially fed-batch culture. Mammalian cell culture media designs have evolved from the classical formulations designed by Eagle and Ham, to today's formulations designed from continuous improvement and statistical frameworks. Feed media is especially important for ensuring robust cell growth, productivity, and ensuring the product quality of recombinant therapeutics are within acceptable ranges. Numerous studies have highlighted the benefit of various media designs, supplements, and feed addition strategies towards the resulting cell culture process. In this work we highlight the use of a top-down level approach towards feed media design enabled by the use of select surfactants for the targeted enrichment of a chemically defined feed media. The use of the enriched media was able to improve product titers at g/L levels, without adversely impacting the growth of multiple Chinese Hamster Ovary cell lines or the product quality of multiple recombinant antibodies. © 2013 American Institute of Chemical Engineers.
Use of redundant arrays of inexpensive disks in orthodontic practice.
Graham, David Matthew; Graham, Michael James; Mupparapu, Mel
2017-04-01
In a time when orthodontists are getting away from paper charts and going digital with their patient data and imaging, practitioners need to be prepared for a potential hardware failure in their data infrastructure. Although a backup plan in accordance with the Security Rule of the Health Insurance Portability and Accountability Act (HIPAA) of 1996 may prevent data loss in case of a disaster or hard drive failure, it does little to ensure business and practice continuity. Through the implementation of a common technique used in information technology, the redundant array of inexpensive disks, a practice may continue normal operations without interruption if a hard drive fails. Copyright © 2017 American Association of Orthodontists. Published by Elsevier Inc. All rights reserved.
Smart catheter flow sensor for real-time continuous regional cerebral blood flow monitoring
NASA Astrophysics Data System (ADS)
Li, Chunyan; Wu, Pei-Ming; Hartings, Jed A.; Wu, Zhizhen; Ahn, Chong H.; LeDoux, David; Shutter, Lori A.; Narayan, Raj K.
2011-12-01
We present a smart catheter flow sensor for real-time, continuous, and quantitative measurement of regional cerebral blood flow using in situ temperature and thermal conductivity compensation. The flow sensor operates in a constant-temperature mode and employs a periodic heating and cooling technique. This approach ensures zero drift and provides highly reliable data with microelectromechanical system-based thin film sensors. The developed flow sensor has a sensitivity of 0.973 mV/ml/100 g/min in the range from 0 to 160 ml/100 g/min with a linear correlation coefficient of R2 = 0.9953. It achieves a resolution of 0.25 ml/100 g/min and an accuracy better than 5 ml/100 g/min.
DOT National Transportation Integrated Search
2003-10-29
The Beta Test and Baseline Data Collection efforts ensured that the test technologies would successfully operate during the field operational test (FOT) in the designed scenario configurations. These efforts also ensured that FOT systems would succes...
Tactical physical preparation: the case for a movement-based approach.
Kechijian, Doug; Rush, Stephen
2012-01-01
Progressive injury prevention and physical preparation programs are needed in military special operations to optimize mission success and Operator quality of life and longevity. While physical risk is inherent in Special Operations, non-traumatic injuries resulting from overuse, poor biomechanics, and arbitrary exercise selection can be alleviated with proper medical care and patient education. An integrated approach to physical readiness that recognizes the continuity between rehabilitation and performance training is advocated to ensure that physiological adaptations do not come at the expense of orthopedic health or movement proficiency. Movement quality should be regularly evaluated and enforced throughout the training process to minimize preventable injuries and avoid undermining previous rehabilitative care. While fitness and proper movement are not substitutes for Operator specific tasks, they are foundational to many tactically-relevant skills. In light of how much is at stake, sports medicine care in the military, especially special operations, should parallel that which is practiced in professional and collegiate athletics. 2012.
Share the Sky: Concepts and Technologies That Will Shape Future Airspace Use
NASA Technical Reports Server (NTRS)
Ballin, Mark G.; Cotton, William; Kopardekar, Parimal
2011-01-01
The airspace challenge for the United States is to protect national sovereignty and ensure the safety and security of those on the ground and in the air, while at the same time ensuring the efficiency of flight, reducing the costs involved, protecting the environment, and protecting the freedom of access to the airspace. Many visions of the future NAS hold a relatively near-term perspective, focusing on existing uses of the airspace and assuming that new uses will make up a small fraction of total use. In the longer term, the skies will be filled with diverse and amazing new air vehicles filling our societal needs. Anticipated new vehicles include autonomous air vehicles acting both independently and in coordinated groups, unpiloted cargo carriers, and large numbers of personal air vehicles and small-scale point-to-point transports. These vehicles will enable new capabilities that have the potential to increase societal mobility, transport freight at lower cost and with lower environmental impact, improve the study of the Earth s atmosphere and ecosystem, and increase societal safety and security by improving or drastically lowering the cost of critical services such as firefighting, emergency medical evacuation, search and rescue, border and neighborhood surveillance, and the inspection of our infrastructure. To ensure that uses of the airspace can continue to grow for the benefit of all, a new paradigm for operations is needed: equitably and safely sharing the airspace. This paper is an examination of such a vision, concentrating on the operations of all types of air vehicles and future uses of the National Airspace. Attributes of a long-term future airspace system are provided, emerging operations technologies are described, and initial steps in research and development are recommended.
Electronic-beam analysis of excimer lasers used for photorefractive keratotomy
NASA Astrophysics Data System (ADS)
Roundy, Carlos B.
1998-07-01
Excimer lasers are an excellent instrument for performing photorefractive keratotomy, PRK. The UV light from the laser causes an ablation of the cornea in proportion to the intensity of the light. The primary characteristic essential to successful PRK is the uniformity of the Top Hat, or working portion of the laser beam. In order for this intensity profile to be sufficiently uniform for PRK, it is essential to periodically measure the equality of the laser beam profile. This ensures that the laser continues to operate properly and provide the expected performance.
Catalysts for conversion of syngas to liquid motor fuels
Rabo, Jule A.; Coughlin, Peter K.
1987-01-01
Synthesis gas comprising carbon monoxide and hydrogen is converted to C.sub.5.sup.+ hydrocarbons suitable for use as liquid motor fuels by contact with a dual catalyst composition capable of ensuring the production of only relatively minor amounts of heavy products boiling beyond the diesel oil range. The catalyst composition, having desirable stability during continuous production operation, employs a Fischer-Tropsch catalyst, together with a co-catalyst/support component. The latter component is a steam-stabilized zeolite Y catalyst of hydrophobic character, desirably in acid-extracted form.
NASA Astrophysics Data System (ADS)
Bellido, E.
The EUTELSAT FDU (Flight Dynamics Unit) manages the resources to perform the typical activities of the large satellite operators and faces the usual difficulties raising from a vast and heterogeneous fleet. At present 20 satellites from 9 different platforms/sub-platforms are controlled from our Satellite Control Centre. The FDU was created in 2002 with the aim to respond to the operational needs of a growing fleet in terms of number of satellites and activities. It is at present composed of 6 engineering staff with the objective to provide operations service covering the whole lifecycle of the satellites from the procurement phase till the decommissioning. The most demanding activity is the daily operations, which must ensure maximum safety and continuity of service with the highest efficiency. Solutions have been applied from different areas: management, structure, operations organisation, processes, facilities, quality standards, etc. In addition to this, EUTELSAT is a growing communications operator and the FDU needs to contribute to the global objectives of the company. This paper covers our approach.
NASA Astrophysics Data System (ADS)
Arafat, Md Nayeem
Distributed generation systems (DGs) have been penetrating into our energy networks with the advancement in the renewable energy sources and energy storage elements. These systems can operate in synchronism with the utility grid referred to as the grid connected (GC) mode of operation, or work independently, referred to as the standalone (SA) mode of operation. There is a need to ensure continuous power flow during transition between GC and SA modes, referred to as the transition mode, in operating DGs. In this dissertation, efficient and effective transition control algorithms are developed for DGs operating either independently or collectively with other units. Three techniques are proposed in this dissertation to manage the proper transition operations. In the first technique, a new control algorithm is proposed for an independent DG which can operate in SA and GC modes. The proposed transition control algorithm ensures low total harmonic distortion (THD) and less voltage fluctuation during mode transitions compared to the other techniques. In the second technique, a transition control is suggested for a collective of DGs operating in a microgrid system architecture to improve the reliability of the system, reduce the cost, and provide better performance. In this technique, one of the DGs in a microgrid system, referred to as a dispatch unit , takes the additional responsibility of mode transitioning to ensure smooth transition and supply/demand balance in the microgrid. In the third technique, an alternative transition technique is proposed through hybridizing the current and droop controllers. The proposed hybrid transition control technique has higher reliability compared to the dispatch unit concept. During the GC mode, the proposed hybrid controller uses current control. During the SA mode, the hybrid controller uses droop control. During the transition mode, both of the controllers participate in formulating the inverter output voltage but with different weights or coefficients. Voltage source inverters interfacing the DGs as well as the proposed transition control algorithms have been modeled to analyze the stability of the algorithms in different configurations. The performances of the proposed algorithms are verified through simulation and experimental studies. It has been found that the proposed control techniques can provide smooth power flow to the local loads during the GC, SA and transition modes.
Establishment of CDC Global Rapid Response Team to Ensure Global Health Security.
Stehling-Ariza, Tasha; Lefevre, Adrienne; Calles, Dinorah; Djawe, Kpandja; Garfield, Richard; Gerber, Michael; Ghiselli, Margherita; Giese, Coralie; Greiner, Ashley L; Hoffman, Adela; Miller, Leigh Ann; Moorhouse, Lisa; Navarro-Colorado, Carlos; Walsh, James; Bugli, Dante; Shahpar, Cyrus
2017-12-01
The 2014-2016 Ebola virus disease epidemic in West Africa highlighted challenges faced by the global response to a large public health emergency. Consequently, the US Centers for Disease Control and Prevention established the Global Rapid Response Team (GRRT) to strengthen emergency response capacity to global health threats, thereby ensuring global health security. Dedicated GRRT staff can be rapidly mobilized for extended missions, improving partner coordination and the continuity of response operations. A large, agencywide roster of surge staff enables rapid mobilization of qualified responders with wide-ranging experience and expertise. Team members are offered emergency response training, technical training, foreign language training, and responder readiness support. Recent response missions illustrate the breadth of support the team provides. GRRT serves as a model for other countries and is committed to strengthening emergency response capacity to respond to outbreaks and emergencies worldwide, thereby enhancing global health security.
Advances in solid dosage form manufacturing technology.
Andrews, Gavin P
2007-12-15
Currently, the pharmaceutical and healthcare industries are moving through a period of unparalleled change. Major multinational pharmaceutical companies are restructuring, consolidating, merging and more importantly critically assessing their competitiveness to ensure constant growth in an ever-more demanding market where the cost of developing novel products is continuously increasing. The pharmaceutical manufacturing processes currently in existence for the production of solid oral dosage forms are associated with significant disadvantages and in many instances provide many processing problems. Therefore, it is well accepted that there is an increasing need for alternative processes to dramatically improve powder processing, and more importantly to ensure that acceptable, reproducible solid dosage forms can be manufactured. Consequently, pharmaceutical companies are beginning to invest in innovative processes capable of producing solid dosage forms that better meet the needs of the patient while providing efficient manufacturing operations. This article discusses two emerging solid dosage form manufacturing technologies, namely hot-melt extrusion and fluidized hot-melt granulation.
Data Specifications for the Landsat Data Continuity Mission
Irons, J.R.; Speciale, N.J.; Douglas, McCuistion J.; Masek, J.G.; Markham, B.L.; Storey, James C.; Lencioni, D.E.; Ryan, R.E.
2003-01-01
The National Aeronautics and Space Administration (NASA) plans to procure data from a privately-owned and commercially-operated remote sensing system for the next Landsat mission, the Landsat Data Continuity Mission (LDCM). Data requirements are documented in an LDCM Data Specification. The specifications require delivery of data covering 250 Landsat scenes on a daily basis. The data are to be acquired in a manner that affords seasonal coverage of the global land mass. Data are required for the heritage reflective Thematic Mapper (TM) spectral bands plus two new bands, a blue band for coastal zone observations and a short wave infrared band for cirrus cloud detection. The specifications do not require thermal data, representing a departure from the TM heritage. The specification also requires data providing a 30 m ground sample distance for each of the spectral bands with the exception of the new cirrus cloud band at 120 m. An absolute uncertainty of 5 percent or less is required for radiometrically corrected LDCM data and the commercial operator is required to deliver data that can be registered to a cartographic projection with an uncertainty of 65 m or less. Procuring data from a commercial operator represents a new approach for the 30-year-old Landsat Program. The LDCM Data Specification will ensure that the procured data provides continuity of the Landsat data stream and advances the mission.
Delta clipper lessons learned for increased operability in reusable space vehicles
NASA Astrophysics Data System (ADS)
Charette, Ray O.; Steinmeyer, Don A.; Smiljanic, Ray R.
1998-01-01
Important lessons were learned from the design, development, and test (DD&T), and operation of the Delta Clipper Experimental (DC-X/XA) Reusable Launch Vehicle (RLV) which apply to increased operability for the operational Reusable Space Vehicles (RSVs). Boeing maintains a continuous process improvement program that provides the opportunity to ``institutionalize'' the results from projects such as Delta Clipper for application to product improvement in future programs. During the design phase, operations and supportability (O&S) were emphasized to ensure aircraft-like operations, traceable to an operational RSV. The operations personnel, flight, and ground crew and crew chief were actively involved in the design, manufacture, and checkout of the systems. Changes and additions to capability were implemented as they evolved from knowledge gained in each phase of development. This paper presents key lessons learned with respect to design and implementation of flight systems, propulsion, airframe, hydraulics, avionics, and ground operations. Information was obtained from discussions with personnel associated with this program concerning their experience and lessons learned. Additionally, field process records and operations timelines were evaluated for applicability to RSVs. The DC-X program pursued reusability in all aspects of the design, a unique approach in rocket system development.
Quantum anonymous voting with unweighted continuous-variable graph states
NASA Astrophysics Data System (ADS)
Guo, Ying; Feng, Yanyan; Zeng, Guihua
2016-08-01
Motivated by the revealing topological structures of continuous-variable graph state (CVGS), we investigate the design of quantum voting scheme, which has serious advantages over the conventional ones in terms of efficiency and graphicness. Three phases are included, i.e., the preparing phase, the voting phase and the counting phase, together with three parties, i.e., the voters, the tallyman and the ballot agency. Two major voting operations are performed on the yielded CVGS in the voting process, namely the local rotation transformation and the displacement operation. The voting information is carried by the CVGS established before hand, whose persistent entanglement is deployed to keep the privacy of votes and the anonymity of legal voters. For practical applications, two CVGS-based quantum ballots, i.e., comparative ballot and anonymous survey, are specially designed, followed by the extended ballot schemes for the binary-valued and multi-valued ballots under some constraints for the voting design. Security is ensured by entanglement of the CVGS, the voting operations and the laws of quantum mechanics. The proposed schemes can be implemented using the standard off-the-shelf components when compared to discrete-variable quantum voting schemes attributing to the characteristics of the CV-based quantum cryptography.
NASA Astrophysics Data System (ADS)
Mössinger, Peter; Jester-Zürker, Roland; Jung, Alexander
2017-01-01
With increasing requirements for hydropower plant operation due to intermittent renewable energy sources like wind and solar, numerical simulations of transient operations in hydraulic turbo machines become more important. As a continuation of the work performed for the first workshop which covered three steady operating conditions, in the present paper load changes and a shutdown procedure are investigated. The findings of previous studies are used to create a 360° model and compare measurements with simulation results for the operating points part load, high load and best efficiency. A mesh motion procedure is introduced, allowing to represent moving guide vanes for load changes from best efficiency to part load and high load. Additionally an automated re-mesh procedure is added for turbine shutdown to ensure reliable mesh quality during guide vane closing. All three transient operations are compared to PIV velocity measurements in the draft tube and pressure signals in the vaneless space. Simulation results of axial velocity distributions for all three steady operation points, during both load changes and for the shutdown correlated well with the measurement. An offset at vaneless space pressure is found to be a result of guide vane corrections for the simulation to ensure similar velocity fields. Short-time Fourier transformation indicating increasing amplitudes and frequencies at speed-no load conditions. Further studies will discuss the already measured start-up procedure and investigate the necessity to consider the hydraulic system dynamics upstream of the turbine by means of a 1D3D coupling between the 3D flow field and a 1D system model.
2001-01-12
This final rule modifies the Medicaid upper payment limits for inpatient hospital services, outpatient hospital services, nursing facility services, intermediate care facility services for the mentally retarded, and clinic services. For each type of Medicaid inpatient service, existing regulations place an upper limit on overall aggregate payments to all facilities and a separate aggregate upper limit on payments made to State-operated facilities. This final rule establishes an aggregate upper limit that applies to payments made to government facilities that are not State government-owned or operated, and a separate aggregate upper limit on payments made to privately-owned and operated facilities. This rule also eliminates the overall aggregate upper limit that had applied to these services. With respect to outpatient hospital and clinic services, this final rule establishes an aggregate upper limit on payments made to State government-owned or operated facilities, an aggregate upper limit on payments made to government facilities that are not State government-owned or operated, and an aggregate upper limit on payments made to privately-owned and operated facilities. These separate upper limits are necessary to ensure State Medicaid payment systems promote economy and efficiency. We are allowing a higher upper limit for payment to non-State public hospitals to recognize the higher costs of inpatient and outpatient services in public hospitals. In addition, to ensure continued beneficiary access to care and the ability of States to adjust to the changes in the upper payment limits, the final rule includes a transition period for States with approved rate enhancement State plan amendments.
Advanced Design Features of APR1400 and Realization in Shin Kori Construction Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
OH, S.J.; Park, K.C.; Kim, H.G.
2006-07-01
APR1400 adopted several advanced design features. To ensure their proper operation as a part of ShinKori 3,4 project, both experimental and analytical work are continuing. In this paper, work on the advanced design features related to enhanced safety is examined. APR1400 safety injection system consists of four independent trains which include four safety injection pump and tanks. A passive flow regulating device called fluidic device is installed in the safety injection tanks. Separate effect tests including a full scale fluidic device tests have been conducted. Integral system tests are in progress. Combination of these work with the analytical work usingmore » RELAP5/Mod3 would ensure the proper operation of the new safety injection systems. To mitigate severe accidents, hydrogen mitigation system using PARs and igniters is adopted. Also, active injection system and the streamlined insulation design are adopted to enhance the in-vessel retention capability with the external cooling of RPV strategy. Analytic work with supporting experiments is performed. We are certain that these preparatory work would help the successful adaptation of ADF in ShinKori project. (authors)« less
Code of Federal Regulations, 2012 CFR
2012-07-01
...) Alternative sources of water supply; (iii) Restructuring or consolidation changes, including ownership change... public water system, State and the Administrator in ensuring that sufficient information is available and... Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING...
Code of Federal Regulations, 2013 CFR
2013-07-01
...) Alternative sources of water supply; (iii) Restructuring or consolidation changes, including ownership change... public water system, State and the Administrator in ensuring that sufficient information is available and... Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING...
Geolab Results from Three Years of Analog Mission Tests
NASA Technical Reports Server (NTRS)
Evans, Cindy A.; Bell, M. S.; Calaway, M. J.
2013-01-01
GeoLab is a prototype glovebox for geological sample examination that was, until November 2012, fully integrated into NASA's Deep Space Habitat Analog Testbed [1,2]. GeoLab allowed us to test science operations related to contained sample examination during simulated exploration missions. The facility, shown in Figure 1 and described elsewhere [1-4], was designed for fostering the development of both instrument technology and operational concepts for sample handling and examination during future missions [3-5]. Even though we recently deintegrated the glovebox from the Deep Space Habitat (Fig. 2), it continues to provide a high-fidelity workspace for testing instruments that could be used for sample characterization. As a testbed, GeoLab supports the development of future science operations that will enhance the early scientific returns from exploration missions, and will help ensure selection of the best samples for Earth return.
Quality Interaction Between Mission Assurance and Project Team Members
NASA Technical Reports Server (NTRS)
Kwong-Fu, Helenann H.; Wilson, Robert K.
2006-01-01
Mission Assurance independent assessments started during the development cycle and continued through post launch operations. In operations, Health and Safety of the Observatory is of utmost importance. Therefore, Mission Assurance must ensure requirements compliance and focus on process improvements required across the operational systems including new/modified products, tools, and procedures. The deployment of the interactive model involves three objectives: Team member Interaction, Good Root Cause Analysis Practices, and Risk Assessment to avoid reoccurrences. In applying this model, we use a metric based measurement process and was found to have the most significant effect, which points to the importance of focuses on a combination of root cause analysis and risk approaches allowing the engineers the ability to prioritize and quantify their corrective actions based on a well-defined set of root cause definitions (i.e. closure criteria for problem reports), success criteria and risk rating definitions.
NASA Technical Reports Server (NTRS)
Hoang, Ty; Swenson, Harry N.
1997-01-01
The Traffic Management Advisor (TMA), the sequence and schedule tool of the Center/TRACON Automation System (CTAS), was evaluated at the Fort Worth Center (ZFW) in the summer of 1996. This paper describes the challenges encountered during the various phases of the TMA field evaluation, which included system (hardware and software) installation, personnel training, and data collection. Operational procedures were developed and applied to the evaluation process that would ensure air safety. The five weeks of field evaluation imposed minimal impact on the hosting facility and provided valuable engineering and human factors data. The collection of data was very much an opportunistic affair, due to dynamic traffic conditions. One measure of the success of the TMA evaluation is that, rather than remove TMA after the evaluation until it could be fully implemented, the prototype TMA is in continual use at ZFW as the fully operational version is readied for implementation.
28 CFR 91.3 - General eligibility requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... construct, develop, expand, operate or improve correctional facilities to ensure that secure space is..., development, expansion, modification, operation or improvement of correctional facilities designed to ensure... of the multi-state compact agreement that specifies the construction, development, expansion...
28 CFR 91.3 - General eligibility requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... construct, develop, expand, operate or improve correctional facilities to ensure that secure space is..., development, expansion, modification, operation or improvement of correctional facilities designed to ensure... of the multi-state compact agreement that specifies the construction, development, expansion...
28 CFR 91.3 - General eligibility requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... construct, develop, expand, operate or improve correctional facilities to ensure that secure space is..., development, expansion, modification, operation or improvement of correctional facilities designed to ensure... of the multi-state compact agreement that specifies the construction, development, expansion...
28 CFR 91.3 - General eligibility requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... construct, develop, expand, operate or improve correctional facilities to ensure that secure space is..., development, expansion, modification, operation or improvement of correctional facilities designed to ensure... of the multi-state compact agreement that specifies the construction, development, expansion...
28 CFR 91.3 - General eligibility requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... construct, develop, expand, operate or improve correctional facilities to ensure that secure space is..., development, expansion, modification, operation or improvement of correctional facilities designed to ensure... of the multi-state compact agreement that specifies the construction, development, expansion...
2013-12-12
CAPE CANAVERAL, Fla. – The United Launch Alliance Atlas V first stage booster that will boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft into orbit arrives at Cape Canaveral Air Force Station's Launch Complex 41. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/Kim Shiflett
2013-12-12
CAPE CANAVERAL, Fla. – The United Launch Alliance Atlas V first stage booster that will boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft into orbit arrives at Cape Canaveral Air Force Station's Launch Complex 41. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/Kim Shiflett
2013-12-13
CAPE CANAVERAL, Fla. – At Cape Canaveral Air Force Station's Launch Complex 41, a Centaur second stage is positioned atop a United Launch Alliance Atlas V rocket that will be used to boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft to orbit. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/Charisse Nahser
2013-12-12
CAPE CANAVERAL, Fla. – The United Launch Alliance Atlas V first stage booster that will boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft into orbit arrives at Cape Canaveral Air Force Station's Launch Complex 41. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/Kim Shiflett
2013-12-13
CAPE CANAVERAL, Fla. – At Cape Canaveral Air Force Station's Launch Complex 41, a Centaur second stage is positioned atop a United Launch Alliance Atlas V rocket that will be used to boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft to orbit. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/Charisse Nahser
Continuous Evaluation in Ethics Education: A Case Study.
McIntosh, Tristan; Higgs, Cory; Mumford, Michael; Connelly, Shane; DuBois, James
2018-04-01
A great need for systematic evaluation of ethics training programs exists. Those tasked with developing an ethics training program may be quick to dismiss the value of training evaluation in continuous process improvement. In the present effort, we use a case study approach to delineate how to leverage formative and summative evaluation measures to create a high-quality ethics education program. With regard to formative evaluation, information bearing on trainee reactions, qualitative data from the comments of trainees, in addition to empirical findings, can ensure that the training program operates smoothly. Regarding summative evaluation, measures examining trainee cognition, behavior, and organization-level results provide information about how much trainees have changed as a result of taking the ethics training. The implications of effective training program evaluation are discussed.
Automation for Accommodating Fuel-Efficient Descents in Constrained Airspace
NASA Technical Reports Server (NTRS)
Coopenbarger, Richard A.
2010-01-01
Continuous descents at low engine power are desired to reduce fuel consumption, emissions and noise during arrival operations. The challenge is to allow airplanes to fly these types of efficient descents without interruption during busy traffic conditions. During busy conditions today, airplanes are commonly forced to fly inefficient, step-down descents as airtraffic controllers work to ensure separation and maximize throughput. NASA in collaboration with government and industry partners is developing new automation to help controllers accommodate continuous descents in the presence of complex traffic and airspace constraints. This automation relies on accurate trajectory predictions to compute strategic maneuver advisories. The talk will describe the concept behind this new automation and provide an overview of the simulations and flight testing used to develop and refine its underlying technology.
Division Artillery: Linking Strategy to Tactics
2017-05-25
operational artist, while within modularity , there is no advocate for ensuring that subordinate field artillery units are getting the manning...adaptability, and synchronization. The division artillery is the operational artist, while within modularity , there is no advocate for ensuring...30 Modularization
Annual Sustainability Report FY 2014. Incorporates NREL Site Sustainability Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rukavina, Frank
NREL's Sustainability Program is responsible for upholding all executive orders, federal regulations, U.S. Department of Energy (DOE) orders, and goals related to sustainable and resilient facility operations. But NREL continues to expand sustainable practices above and beyond the laboratory's regulations and requirements to ensure that the laboratory fulfills its mission into the future, leaves the smallest possible legacy footprint, and models sustainable operations and behaviors on national, regional, and local levels. The report, per the GRI reporting format, elaborates on multi-year goals relative to executive orders, achievements, and challenges; and success stories provide specific examples. A section called 'Sustaining NREL'smore » Future Through Integration' provides insight into how NREL is successfully expanding the adoption of renewable energy technologies through integration.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NREL's Sustainability Program is responsible for upholding all executive orders, federal regulations, U.S. Department of Energy (DOE) orders, and goals related to sustainable and resilient facility operations. But NREL continues to expand sustainable practices above and beyond the laboratory's regulations and requirements to ensure that the laboratory fulfills its mission into the future, leaves the smallest possible legacy footprint, and models sustainable operations and behaviors on national, regional, and local levels. The report, per the GRI reporting format, elaborates on multi-year goals relative to executive orders, achievements, and challenges; and success stories provide specific examples. A section called 'NREL's Resiliencymore » is Taking Many Forms' provides insight into how NREL is drawing on its deep knowledge of renewable energy and energy efficiency to help mitigate or avoid climate change impacts.« less
Millimeter wave experiment for ATS-F
NASA Technical Reports Server (NTRS)
Green, J. S.; Parisky, R. N.; Shapiro, S. S.
1973-01-01
A detailed description of spaceborne equipment is provided. The equipment consists of two transmitters radiating signals at 20 and 30 GHz from either U.S. coverage horn antennas or a narrow beam parabolic antenna. Three modes of operation are provided: a continuous wave mode, a multitone mode in which nine spectral lines having 180 MHz separation and spaced symmetrically about each carrier, and a communications mode in which communications signals from the main spacecraft transponder are modulated on the two carriers. Detailed performance attained in the flight/prototype model of the equipment is presented both under laboratory conditions and under environmental extremes. Provisions made for ensuring reliability in space operation are described. Also described the bench test equipment developed for use with the experiment, and a summary of the new technology is included.
Solé, Meritxell; Panteli, Dimitra; Risso-Gill, Isabelle; Döring, Nora; Busse, Reinhard; McKee, Martin; Legido-Quigley, Helena
2014-12-01
This paper reviews procedures for ensuring that physicians in the European Union (EU) continue to meet criteria for registration and the implications of these procedures for cross-border movement of health professionals following implementation of the 2005/36/EC Directive on professional qualifications. A questionnaire was completed by key informants in 10 EU member states, supplemented by a review of peer-reviewed and grey literature and a review conducted by key experts in each country. The questionnaire covered three aspects: actors involved in processes for ensuring continued adherence to standards for registration and/or licencing (such as revalidation), including their roles and functions; the processes involved, including continuing professional development (CPD) and/or continuing medical education (CME); and contextual factors, particularly those impacting professional mobility. All countries included in the study view CPD/CME as one mechanism to demonstrate that doctors continue to meet key standards. Although regulatory bodies in a few countries have established explicit systems of ensuring continued competence, at least for some doctors (in Belgium, Germany, Hungary, the Netherlands, Slovenia and the UK), self-regulation is considered sufficient to ensure that physicians are up to date and fit to practice in others (Austria, Finland, Estonia and Spain). Formal systems vary greatly in their rationale, structure, and coverage. Whereas in Germany, Hungary and Slovenia, systems are exclusively focused on CPD/CME, the Netherlands also includes peer review and minimum activity thresholds. Belgium and the UK have developed more complex mechanisms, comprising a review of complaints or compliments on performance and (in the UK) colleague and patient questionnaires. Systems for ensuring that doctors continue to meet criteria for registration and licencing across the EU are complex and inconsistent. Participation in CPD/CME is only one aspect of maintaining professional competence but it is the only one common to all countries. Thus, there is a need to bring clarity to this confused landscape. © 2014 Royal College of Physicians.
Electric Propulsion Technology Development for the Jupiter Icy Moons Orbiter Project
NASA Technical Reports Server (NTRS)
2004-01-01
During 2004, the Jupiter Icy Moons Orbiter project, a part of NASA's Project Prometheus, continued efforts to develop electric propulsion technologies. These technologies addressed the challenges of propelling a spacecraft to several moons of Jupiter. Specific challenges include high power, high specific impulse, long lived ion thrusters, high power/high voltage power processors, accurate feed systems, and large propellant storage systems. Critical component work included high voltage insulators and isolators as well as ensuring that the thruster materials and components could operate in the substantial Jupiter radiation environment. A review of these developments along with future plans is discussed.
Review of performance, medical, and operational data on pilot aging issues
NASA Technical Reports Server (NTRS)
Stoklosa, J. H.
1992-01-01
An extensive review of the literature and studies relating to performance, medical, operational, and legal data regarding pilot aging issues was performed in order to determine what evidence there is, if any, to support mandatory pilot retirement. Popular misconceptions about aging, including the failure to distinguish between the normal aging process and disease processes that occur more frequently in older individuals, continue to contribute to much of the misunderstanding and controversy that surround this issue. Results: Review of medical data related to the pilot aging issue indicate that recent improvement in medical diagnostics and treatment technology have made it possible to identify to a high degree individuals who are at risk for developing sudden incapacitating illness and for treating those with disqualifying medical conditions. Performance studies revealed that after controlling for the presence of disease states, older pilots are able to perform as well as younger pilots on many performance tasks. Review of accident data showed that older, healthy pilots do not have higher accident rates than younger pilots, and indeeed, evidence suggests that older pilots have an advantage in the cockpit due to higher experience levels. The Man-Machine-Mission-Environment interface of factors can be managed through structured, supervised, and enhanced operations, maintenance, flight reviews, and safety procedures in order to ensure safe and productive operations by reducing the margin of error and by increasing the margin of safety. Conclusions: There is no evidence indicating any specific age as an arbitrary cut-off point for pilots to perform their fight duties. A combination of regular medical screening, performance evaluation, enhanced operational maintenance, and safety procedures can most effectively ensure a safe pilot population than can a mandatory retirement policy based on arbitrary age restrictions.
Online Calibration of Polytomous Items Under the Generalized Partial Credit Model
Zheng, Yi
2016-01-01
Online calibration is a technology-enhanced architecture for item calibration in computerized adaptive tests (CATs). Many CATs are administered continuously over a long term and rely on large item banks. To ensure test validity, these item banks need to be frequently replenished with new items, and these new items need to be pretested before being used operationally. Online calibration dynamically embeds pretest items in operational tests and calibrates their parameters as response data are gradually obtained through the continuous test administration. This study extends existing formulas, procedures, and algorithms for dichotomous item response theory models to the generalized partial credit model, a popular model for items scored in more than two categories. A simulation study was conducted to investigate the developed algorithms and procedures under a variety of conditions, including two estimation algorithms, three pretest item selection methods, three seeding locations, two numbers of score categories, and three calibration sample sizes. Results demonstrated acceptable estimation accuracy of the two estimation algorithms in some of the simulated conditions. A variety of findings were also revealed for the interacted effects of included factors, and recommendations were made respectively. PMID:29881063
GOES-R Space Weather Data: Products and Data Access
NASA Astrophysics Data System (ADS)
Tilton, M.; Rowland, W. F.; Codrescu, S.; Denig, W. F.; Seaton, D. B.
2016-12-01
In November 2016 NOAA launched the first in the "R" series of Geostationary Operational Environmental Satellites (GOES-R). GOES-R continues a tradition of almost 40 years of continuous space and solar observations at geostationary orbit. Compared to its predecessors, the GOES-R satellite provides improved in situ measurements of charged particle and magnetic field environments. The satellite also offers enhanced remote sensing of the sun through ultraviolet (UV) imagery and X-ray/UV irradiance. After the spacecraft completes early-orbit checkout and calibration, GOES-R space weather data and derived products will be used for operations within NOAA's Space Weather Prediction Center and publicly released through the National Centers for Environmental Information (NCEI). This presentation will provide an overview of GOES-R space weather data ranging from direct measurements (L0 data) to higher level science (L2+) products developed by NCEI scientists. We will also present planned data access and distribution features. We emphasize our strategy to ensure data discoverability and accessibility, including our participation in NOAA's OneStop project and potential partnerships with NASA's Virtual Solar Observatory and projects like Helioviewer.
Duvall, Susan; Thurston, Sarah; Weinberger, Michelle; Nuccio, Olivia; Fuchs-Montgomery, Nomi
2014-01-01
Contraceptive implants offer promising opportunities for addressing the high and growing unmet need for modern contraceptives in sub-Saharan Africa. Marie Stopes International (MSI) offers implants as one of many family planning options. Between 2008 and 2012, MSI scaled up voluntary access to implants in 15 sub-Saharan African countries, from 80,041 implants in 2008 to 754,329 implants in 2012. This 9-fold increase amounted to more than 1.7 million implants delivered cumulatively over the 5-year period. High levels of client satisfaction were attained alongside service provision scale up by using existing MSI service delivery channels—mobile outreach, social franchising, and clinics—to implement strategies that broadened access for underserved clients and maintained service quality. Use of adaptive and context-specific service delivery models and attention to key operational components, including sufficient numbers of trained providers, strong supply chains, diverse financing mechanisms, and implant removal services, underpinned our service delivery efforts. Accounting for 70% of the implants delivered by MSI in 2012, mobile outreach services through dedicated MSI provider teams played a central role in scale-up efforts, fueled in part by the provision of free or heavily subsidized services. Social franchising also demonstrated promise for future program growth, along with MSI clinics. Continued high growth in implant provision between 2011 and 2012 in all sub-Saharan African countries indicates the region's capacity for further service delivery expansion. Meeting the expected rising demand for implants and ensuring long-term sustainable access to the method, as part of a comprehensive method mix, will require continued use of appropriate service delivery models, effective operations, and ongoing collaboration between the private, public, and nongovernmental sectors. MSI's experience can be instructive for future efforts to ensure contraceptive access and choice in sub-Saharan Africa, especially as the global health community works to achieve its Family Planning 2020 (FP2020) commitments to expand family planning access to 120 million new users. PMID:25276564
Duvall, Susan; Thurston, Sarah; Weinberger, Michelle; Nuccio, Olivia; Fuchs-Montgomery, Nomi
2014-02-01
Contraceptive implants offer promising opportunities for addressing the high and growing unmet need for modern contraceptives in sub-Saharan Africa. Marie Stopes International (MSI) offers implants as one of many family planning options. Between 2008 and 2012, MSI scaled up voluntary access to implants in 15 sub-Saharan African countries, from 80,041 implants in 2008 to 754,329 implants in 2012. This 9-fold increase amounted to more than 1.7 million implants delivered cumulatively over the 5-year period. High levels of client satisfaction were attained alongside service provision scale up by using existing MSI service delivery channels-mobile outreach, social franchising, and clinics-to implement strategies that broadened access for underserved clients and maintained service quality. Use of adaptive and context-specific service delivery models and attention to key operational components, including sufficient numbers of trained providers, strong supply chains, diverse financing mechanisms, and implant removal services, underpinned our service delivery efforts. Accounting for 70% of the implants delivered by MSI in 2012, mobile outreach services through dedicated MSI provider teams played a central role in scale-up efforts, fueled in part by the provision of free or heavily subsidized services. Social franchising also demonstrated promise for future program growth, along with MSI clinics. Continued high growth in implant provision between 2011 and 2012 in all sub-Saharan African countries indicates the region's capacity for further service delivery expansion. Meeting the expected rising demand for implants and ensuring long-term sustainable access to the method, as part of a comprehensive method mix, will require continued use of appropriate service delivery models, effective operations, and ongoing collaboration between the private, public, and nongovernmental sectors. MSI's experience can be instructive for future efforts to ensure contraceptive access and choice in sub-Saharan Africa, especially as the global health community works to achieve its Family Planning 2020 (FP2020) commitments to expand family planning access to 120 million new users.
Limitations and challenges towards an effective business continuity management in Nuklear Malaysia
NASA Astrophysics Data System (ADS)
Hamid, A. H. A.
2018-01-01
One of Nuklear Malaysia’s top concerns is radiological and nuclear safety as well as security preparedness of its operational facility management, which was bonded by Act 304, Directive 20 and International Atomic Energy Agency (IAEA) guidelines. In 2012, the Malaysian government initialised the Business Continuity Management System under the supervision of Malaysian Administrative Modernization and Management Planning Unit (MAMPU), referring to MAMPU.BPICT.700-4/2/11 (3), ISO 22301:2012 and Business Continuity Good Practice Guidelines 2013 documentation. These standards are integral to the implementation of a resilient management program that indicates an organisation’s capability to prevent any accident from occurring and spreading its impact, which includes sufficient recovery action to post-accident situation towards a normal operational and managerial state. Unfortunately, there is a lack of certified Business Continuity Management standard among the public sector agencies compared to local private sectors. Subsequently, Nuklear Malaysia has been selected by MAMPU and CyberSecurity Malaysia as one of the pioneering agencies to be certified accordingly. This paper significantly recognized Nuklear Malaysia’s effort to plan, analyse, design, implement, review and validate the establishment of this standard currently. The project was implemented using a case study approach to complete the required certification activities. As a result, this paper proposed benchmarking the selected literature reviews against the Nuklear Malaysia experience to determine best practices in implementing and managing Business Continuity effectively. It concluded that a resilient Business Continuity Management program needs to be incorporated into Nuclear Malaysia’s capabilities in ensuring its mitigation capacities to survive any unexpected event and subsequently overcome future challenges.
Fault-tolerant battery system employing intra-battery network architecture
Hagen, Ronald A.; Chen, Kenneth W.; Comte, Christophe; Knudson, Orlin B.; Rouillard, Jean
2000-01-01
A distributed energy storing system employing a communications network is disclosed. A distributed battery system includes a number of energy storing modules, each of which includes a processor and communications interface. In a network mode of operation, a battery computer communicates with each of the module processors over an intra-battery network and cooperates with individual module processors to coordinate module monitoring and control operations. The battery computer monitors a number of battery and module conditions, including the potential and current state of the battery and individual modules, and the conditions of the battery's thermal management system. An over-discharge protection system, equalization adjustment system, and communications system are also controlled by the battery computer. The battery computer logs and reports various status data on battery level conditions which may be reported to a separate system platform computer. A module transitions to a stand-alone mode of operation if the module detects an absence of communication connectivity with the battery computer. A module which operates in a stand-alone mode performs various monitoring and control functions locally within the module to ensure safe and continued operation.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Poppiti, James; Nelson, Roger; MacMillan, Walter J.
The Waste Isolation Pilot Plant (WIPP) is a 655-meter deep mine near Carlsbad, New Mexico, used to dispose the nation’s defense transuranic waste. Limited airborne radioactivity was released from a container of radioactive waste in WIPP on 14 February, 2014. As designed, a mine ventilation filtration system prevented the large scale release of contamination from the underground. However, isolation dampers leaked, which allowed the release of low levels of contaminants after the event until they were sealed. None of the exposed individuals received any recordable dose. While surface contamination was limited, contamination in the ventilation system and portions of themore » underground was substantial. High efficiency particulate air (HEPA) filters in the operating ventilation system ensure continued containment during recovery and resumption of disposal operations. However, ventilation flow is restricted since the incident, with all exhaust air directed through the filters. Decontamination and natural fixation by the hygroscopic nature of the salt host rock has reduced the likelihood of further contamination spread. Contamination control and ventilation system operability are crucial for resumption of operations. This article provides an operational assessment and evaluation of these two key areas.« less
NASA Technical Reports Server (NTRS)
1972-01-01
Prior to beginning a 90-day test of a regenerative life support system, a need was identified for a training and certification program to qualify an operating staff for conducting the test. The staff was responsible for operating and maintaining the test facility, monitoring and ensuring crew safety, and implementing procedures to ensure effective mission performance with good data collection and analysis. The training program was designed to ensure that each operating staff member was capable of performing his assigned function and was sufficiently cross-trained to serve at certain other positions on a contingency basis. Complicating the training program were budget and schedule limitations, and the high level of sophistication of test systems.
Status of NGS CORS Network and Its Contribution to the GGOS Infrastructure
NASA Astrophysics Data System (ADS)
Choi, K. K.; Haw, D.; Sun, L.
2017-12-01
Recent advancement of Satellite Geodesy techniques can now contribute to the global frame realization needed to improve worldwide accuracies. These techniques rely on coordinates computed using continuously observed GPS data and corresponding satellite orbits. The GPS-based reference system continues to depend on the physical stability of a ground-based network of points as the primary foundation for these observations. NOAA's National Geodetic Survey (NGS) has been operating Continuously Operating Reference Stations (CORS) to provide direct access to the National Spatial Reference System (NSRS). By virtue of NGS' scientific reputation and leadership in national and international geospatial issues, NGS has determined to increase its participation in the maintenance of the U.S. component of the global GPS tracking network in order to realize a long-term stable national terrestrial reference frame. NGS can do so by leveraging its national leadership role coupled with NGS' scientific expertise, in designating and upgrading a subset of the current tracking network for this purpose. This subset of stations must have the highest operational standards to serve the dual functions: being the U.S. contribution to the international frame, along with providing the link to the national datum. These stations deserve special attention to ensure that the highest possible levels of quality and stability are maintained. To meet this need, NGS is working with the international scientific groups to add and designate these reference stations based on scientific merit such as: colocation with other geodetic techniques, geographic area, and monumentation stability.
Love, Cynthia B.; Arnesen, Stacey J.; Phillips, Steven J.
2014-01-01
In 2008, the National Library of Medicine (NLM) established the Disaster Information Management Research Center (DIMRC). Prior to 2008, NLM had a long history of involvement in providing health information for disaster management. Aware of this legacy and moved by the catastrophic aftermath of Hurricane Katrina, the NLM long range plan (Charting a Course for the 21st Century: NLM’s Long Range Plan 2006–2016) called for creation of a center to show “a strong commitment to disaster remediation and to provide a platform for demonstrating how libraries and librarians can be part of the solution to this national problem”. NLM was urged to “ensure continuous access to health information and effective use of libraries and librarians when disasters occur”. In response to this charge, NLM has undertaken substantial efforts to ensure that medical libraries have plans for the continuity of their operations, librarians are trained to understand their roles in preparedness and response, online disaster health information resources are available for many audiences and in multiple formats, and research is conducted on tools to enhance the exchange of critical information during and following disasters. This paper documents the history, goals, initiatives, accomplishments and future plans of the Center. PMID:25324584
Quality-assurance plan for water-resources activities of the U.S. Geological Survey in Idaho
Packard, F.A.
1996-01-01
To ensure continued confidence in its products, the Water Resources Division of the U.S. Geological Survey implemented a policy that all its scientific work be performed in accordance with a centrally managed quality-assurance program. This report establishes and documents a formal policy for current (1995) quality assurance within the Idaho District of the U.S. Geological Survey. Quality assurance is formalized by describing district organization and operational responsibilities, documenting the district quality-assurance policies, and describing district functions. The districts conducts its work through offices in Boise, Idaho Falls, Twin Falls, Sandpoint, and at the Idaho National Engineering Laboratory. Data-collection programs and interpretive studies are conducted by two operating units, and operational and technical assistance is provided by three support units: (1) Administrative Services advisors provide guidance on various personnel issues and budget functions, (2) computer and reports advisors provide guidance in their fields, and (3) discipline specialists provide technical advice and assistance to the district and to chiefs of various projects. The district's quality-assurance plan is based on an overall policy that provides a framework for defining the precision and accuracy of collected data. The plan is supported by a series of quality-assurance policy statements that describe responsibilities for specific operations in the district's program. The operations are program planning; project planning; project implementation; review and remediation; data collection; equipment calibration and maintenance; data processing and storage; data analysis, synthesis, and interpretation; report preparation and processing; and training. Activities of the district are systematically conducted under a hierarchy of supervision an management that is designed to ensure conformance with Water Resources Division goals quality assurance. The district quality-assurance plan does not describe detailed technical activities that are commonly termed "quality-control procedures." Instead, it focuses on current policies, operations, and responsibilities that are implemented at the management level. Contents of the plan will be reviewed annually and updated as programs and operations change.
76 FR 66131 - Submission for OMB Review; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-25
... currently approved collection. Title: Report of Wine Premises Operations. Form: TTB F 5120.17. Abstract: This report is used to monitor wine operations, ensure collection of wine tax revenue, and ensure wine... monthly statistical release on wine. Respondents: Private Sector: Businesses or other for-profits...
2013-12-13
CAPE CANAVERAL, Fla. – At Cape Canaveral Air Force Station, the first stage of the United Launch Alliance Atlas V rocket is lifted for stacking in the Vertical Integration Facility at Launch Complex 41. The vehicle will be used to boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft to orbit. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/Charisse Nahser
2013-12-13
CAPE CANAVERAL, Fla. – At Cape Canaveral Air Force Station, the first stage of the United Launch Alliance Atlas V rocket is lifted for stacking in the Vertical Integration Facility at Launch Complex 41. The vehicle will be used to boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft to orbit. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/Charisse Nahser
2013-12-13
CAPE CANAVERAL, Fla. – At Cape Canaveral Air Force Station, the first stage of the United Launch Alliance Atlas V rocket positioned in the Vertical Integration Facility at Launch Complex 41. The vehicle will be used to boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft to orbit. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/Charisse Nahser
2013-12-13
CAPE CANAVERAL, Fla. – At Cape Canaveral Air Force Station's Launch Complex 41, a technician supports preparations for lifting the Centaur second stage of the United Launch Alliance rocket that will be used to boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft to orbit. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/Charisse Nahser
2013-12-13
CAPE CANAVERAL, Fla. – At Cape Canaveral Air Force Station's Launch Complex 41, a Centaur second stage is lifted for stacking atop a United Launch Alliance Atlas V rocket that will be used to boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft to orbit. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/Charisse Nahser
2013-12-13
CAPE CANAVERAL, Fla. – At Cape Canaveral Air Force Station, the first stage of the United Launch Alliance Atlas V rocket is lifted for stacking in the Vertical Integration Facility at Launch Complex 41. The vehicle will be used to boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft to orbit. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/Charisse Nahser
2013-12-13
CAPE CANAVERAL, Fla. – At Cape Canaveral Air Force Station's Vertical Integration Facility at Launch Complex 41, a crane is positioned to support stacking of the United Launch Alliance Atlas V rocket that will boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft into orbit. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/Charisse Nahser
2013-12-13
CAPE CANAVERAL, Fla. – At Cape Canaveral Air Force Station, engineers and technicians prepare the United Launch Alliance Atlas V rocket for stacking in the Vertical Integration Facility at Launch Complex 41. The vehicle will be used to boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft to orbit. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/Charisse Nahser
2013-12-13
CAPE CANAVERAL, Fla. – At Cape Canaveral Air Force Station's Launch Complex 41, engineers and technicians support lifting a Centaur second stage for stacking atop a United Launch Alliance Atlas V rocket that will be used to boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft to orbit. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/Charisse Nahser
2013-12-13
CAPE CANAVERAL, Fla. – At Cape Canaveral Air Force Station, the first stage of the United Launch Alliance Atlas V rocket is lifted for stacking in the Vertical Integration Facility at Launch Complex 41. The vehicle will be used to boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft to orbit. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/Charisse Nahser
2013-12-13
CAPE CANAVERAL, Fla. – At Cape Canaveral Air Force Station's Launch Complex 41, engineers and technicians support lifting a Centaur second stage for stacking atop a United Launch Alliance Atlas V rocket that will be used to boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft to orbit. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/Charisse Nahser
2013-12-13
CAPE CANAVERAL, Fla. – At Cape Canaveral Air Force Station, a technician supports lifting of a United Launch Alliance Atlas V rocket in the Vertical Integration Facility at Launch Complex 41. The vehicle will be used to boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft to orbit. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/Charisse Nahser
2013-12-13
CAPE CANAVERAL, Fla. – At Cape Canaveral Air Force Station, the first stage of the United Launch Alliance Atlas V rocket is lifted for stacking in the Vertical Integration Facility at Launch Complex 41. The vehicle will be used to boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft to orbit. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/Charisse Nahser
2013-12-13
CAPE CANAVERAL, Fla. – At Cape Canaveral Air Force Station, the first stage of the United Launch Alliance Atlas V rocket positioned in the Vertical Integration Facility at Launch Complex 41. The vehicle will be used to boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft to orbit. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/Charisse Nahser
2013-12-13
CAPE CANAVERAL, Fla. – At Cape Canaveral Air Force Station, the first stage of the United Launch Alliance Atlas V rocket is lifted for stacking in the Vertical Integration Facility at Launch Complex 41. The vehicle will be used to boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft to orbit. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/Charisse Nahser
2013-12-13
CAPE CANAVERAL, Fla. – At Cape Canaveral Air Force Station's Launch Complex 41, engineers and technicians support preparations for lifting the Centaur second stage of the United Launch Alliance rocket that will be used to boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft to orbit. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/Charisse Nahser
2013-12-13
CAPE CANAVERAL, Fla. – At Cape Canaveral Air Force Station's Launch Complex 41, engineers and technicians inspect a Centaur second stage that was just stacked atop a United Launch Alliance Atlas V rocket that will be used to boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft to orbit. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/Charisse Nahser
2013-12-13
CAPE CANAVERAL, Fla. – At Cape Canaveral Air Force Station, engineers and technicians prepare the United Launch Alliance Atlas V rocket for stacking in the Vertical Integration Facility at Launch Complex 41. The vehicle will be used to boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft to orbit. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/Charisse Nahser
2013-12-13
CAPE CANAVERAL, Fla. – At Cape Canaveral Air Force Station, the first stage of the United Launch Alliance Atlas V rocket is lifted for stacking in the Vertical Integration Facility at Launch Complex 41. The vehicle will be used to boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft to orbit. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/Charisse Nahser
2013-12-13
CAPE CANAVERAL, Fla. – At Cape Canaveral Air Force Station's Launch Complex 41, engineers and technicians support lifting a Centaur second stage for stacking atop a United Launch Alliance Atlas V rocket that will be used to boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft to orbit. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/Charisse Nahser
2013-12-13
CAPE CANAVERAL, Fla. – At Cape Canaveral Air Force Station, engineers and technicians prepare the United Launch Alliance Atlas V rocket for stacking in the Vertical Integration Facility at Launch Complex 41. The vehicle will be used to boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft to orbit. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/Charisse Nahser
2013-12-13
CAPE CANAVERAL, Fla. – At Cape Canaveral Air Force Station, the first stage of the United Launch Alliance Atlas V rocket is lifted for stacking in the Vertical Integration Facility at Launch Complex 41. The vehicle will be used to boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft to orbit. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/Charisse Nahser
2013-12-13
CAPE CANAVERAL, Fla. – At Cape Canaveral Air Force Station's Launch Complex 41, a Centaur second stage is lifted for stacking atop a United Launch Alliance Atlas V rocket that will be used to boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft to orbit. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/Charisse Nahser
2013-12-13
CAPE CANAVERAL, Fla. – At Cape Canaveral Air Force Station's Vertical Integration Facility at Launch Complex 41, a crane is positioned to support stacking of the United Launch Alliance Atlas V rocket that will boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft into orbit. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/Charisse Nahser
2013-06-25
CAPE CANAVERAL, Fla. – Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, technicians position equipment and forklifts as work continues to install new roller shaft bearings in crawler-transporter 2, or CT-2. Work continues in high bay 2 to upgrade CT-2. The modifications are designed to ensure CT-2’s ability to transport launch vehicles currently in development, such as the agency’s Space Launch System, to the launch pad. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform and the Apollo-Saturn V rockets and, later, space shuttles to Launch Pads 39A and B. For more information, visit: http://www.nasa.gov/exploration/systems/ground/crawler-transporter_bearings.html. Photo credit: NASA/Jim Grossmann
Tang, Nelson; Levy, Matthew J; Margolis, Asa M; Woltman, Nathan
Physician interest in tactical medicine as an area of professional practice has grown significantly over the past decade. The prevalence of physician involvement in terms of medical oversight and operational support of civilian tactical medicine has experienced tremendous growth during this timeframe. Factors contributing to this trend are multifactorial and include enhanced law enforcement agency understanding of the role of the tactical physician, support for the engagement of qualified medical oversight, increasing numbers of physicians formally trained in tactical medicine, and the ongoing escalation of intentional mass-casualty incidents worldwide. Continued vigilance for the sustenance of adequate and appropriate graduate medical education resources for physicians seeking training in the comprehensive aspects of tactical medicine is essential to ensure continued advancement of the quality of casualty care in the civilian high-threat environment. 2017.
Torán, J; Blánquez, P; Caminal, G
2017-11-01
Hospital wastewater is a major source of pharmaceutically active compounds (PhACs), which are not all removed in conventional wastewater treatment plants. White rot fungi can degrade PhACs, but their application has been limited to non-sterile conditions due to the competition with other microorganisms for growth. In this study, immobilization of Trametes versicolor on different lignocellulosic supports was studied as strategy to ensure fungal survival under continuous treatment conditions. A fluidized bed reactor and a trickling packed-bed reactor with T. versicolor immobilized on pallet wood were employed for the removal of ibuprofen, ketoprofen and naproxen. Best results were obtained with the trickling packed-bed reactor, which operated for 49days with high removal values in real hospital wastewater. Copyright © 2017 Elsevier Ltd. All rights reserved.
Development and testing of a novel subsea production system and control buoy
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1997-04-01
The remoteness of Australia`s northwest shelf presents challenges for the economic viability of offshore resource-development projects. Accordingly, the East Spar development has been designed to minimize capital and life-cycle costs to ensure the long-term viability of this offshore gas field. The offshore facilities are made up of a novel unmanned navigation, communication, and control (NCC) buoy linked to a subsea-production system that includes heat exchangers, insert-retrievable choke valves, multiphase flow-meters, and an on-line pipeline-corrosion monitoring system. The technological building blocks for field development are industry proved. However, the novel arrangement of this proven technology into a remotely controlled, self-contained, minimum-maintenancemore » unmanned facility is unique and has led to many challenges during the design and testing of the NCC buoy and subsea facilities. Among these challenges has been the formulation of an integration test program of the NCC buoy and subsea hardware that proves, as far as reasonably possible, the complete functionality of each equipment item and interface, subject to constraints imposed by schedule, cost, and logistics. Integration testing is particularly important to confirm that the offshore facilities will operate as designed with sufficient reliability and system redundancy to ensure continuous operation throughout the 20-year field life.« less
NASA Astrophysics Data System (ADS)
Vivas Veloso, J. A.; Christie, D. R.; Hoffmann, T. L.; Campus, P.; Bell, M.; Langlois, A.; Martysevich, P.; Demirovik, E.; Carvalho, J.; Kramer, A.; Wu, Sean F.
2002-11-01
The provisional operation and maintenance of IMS infrasound stations after installation and subsequent certification has the objective to prepare the infrasound network for entry into force of the Comprehensive Nuclear-Test-Ban Treaty (CTBT). The goal is to maintain and fine tune the technical capabilities of the network, to repair faulty equipment, and to ensure that stations continue to meet the minimum specifications through evaluation of data quality and station recalibration. Due to the globally dispersed nature of the network, this program constitutes a significant undertaking that requires careful consideration of possible logistic approaches and their financial implications. Currently, 11 of the 60 IMS infrasound stations are transmitting data in the post-installation Testing & Evaluation mode. Another 5 stations are under provisional operation and are maintained in post-certification mode. It is expected that 20% of the infrasound network will be certified by the end of 2002. This presentation will focus on the different phases of post-installation activities of the IMS infrasound program and the logistical challenges to be tackled to ensure a cost-efficient management of the network. Specific topics will include Testing & Evaluation and Certification of Infrasound Stations, as well as Configuration Management and Network Sustainment.
Proposal for an Evaluation Method for the Performance of Work Procedures.
Mohammed, Mouda; Mébarek, Djebabra; Wafa, Boulagouas; Makhlouf, Chati
2016-12-01
Noncompliance of operators with work procedures is a recurrent problem. This human behavior has been said to be situational and studied by many different approaches (ergonomic and others), which consider the noncompliance with work procedures to be obvious and seek to analyze its causes as well as consequences. The object of the proposed method is to solve this problem by focusing on the performance of work procedures and ensuring improved performance on a continuous basis. This study has multiple results: (1) assessment of the work procedures' performance by a multicriteria approach; (2) the use of a continuous improvement approach as a framework for the sustainability of the assessment method of work procedures' performance; and (3) adaptation of the Stop-Card as a facilitator support for continuous improvement of work procedures. The proposed method emphasizes to put in value the inputs of continuous improvement of the work procedures in relation with the conventional approaches which adopt the obvious evidence of the noncompliance to the working procedures and seek to analyze the cause-effect relationships related to this unacceptable phenomenon, especially in strategic industry.
DOE R&D Accomplishments Database
Cooper, R. H.; Martin, M. M.; Riggs, C. R.; Beatty, R. L.; Ohriner, E. K.; Escher, R. N.
1990-04-19
In October 1989, a US shuttle lifted off from Cape Kennedy carrying the spacecraft Galileo on its mission to Jupiter. In November 1990, a second spacecraft, Ulysses, will be launched from Cape Kennedy with a mission to study the polar regions of the sun. The prime source of power for both spacecraft is a series of radioisotope thermoelectric generators (RTGs), which use plutonium oxide (plutonia) as a heat source. Several of the key components in this power system are required to ensure the safety of both the public and the environment and were manufactured at Oak Ridge National Laboratory (ORNL) in the 1980 to 1983 period. For these two missions, Martin Marietta Energy Systems, Inc. (Energy Systems), will provide an iridium alloy component used to contain the plutonia heat source and a carbon composite material that serves as a thermal insulator. ORNL alone will continue to fabricate the carbon composite material. Because of the importance to DOE that Energy Systems deliver these high quality components on time, performance of an Operational Readiness Review (ORR) of these manufacturing activities is necessary. Energy Systems Policy GP 24 entitled "Operational Readiness Process" describes the formal and comprehensive process by which appropriate Energy Systems activities are to be reviewed to ensure their readiness. This Energy System policy is aimed at reducing the risks associated with mission success and requires a management approved "readiness plan" to be issued. This document is the readiness plan for the RTG materials production tasks.
Cavaillé, Laëtitia; Albuquerque, Maria; Grousseau, Estelle; Lepeuple, Anne-Sophie; Uribelarrea, Jean-Louis; Hernandez-Raquet, Guillermina; Paul, Etienne
2016-02-01
In a waste into resource strategy, a selection of polyhydroxybutyrate (PHB)-accumulating organisms from activated sludge was achieved in an open continuous culture under acetic acid and phosphorus limitation. Once the microbial population was selected at a dilution rate (D), an increase in phosphorus limitation degree was applied in order to study the intracellular phosphorus plasticity of selected bacteria and the resulting capacity to produce PHB. Whatever D, all selected populations were able to produce PHB. At a D, the phosphorus availability determined the phosphorus-cell content which in turn fixed the amount of cell. All the remaining carbon was thus directed toward PHB. By decreasing D, microorganisms adapted more easily to higher phosphorus limitation leading to higher PHB content. A one-stage continuous reactor operated at D=0.023h(-)(1) gave reliable high PHB productivity with PHB content up to 80%. A two-stage reactor could ensure better productivity while allowing tuning product quality. Copyright © 2015 Elsevier Ltd. All rights reserved.
Landsat 8: The plans, the reality, and the legacy
Loveland, Thomas R.; Irons, James R.
2016-01-01
Landsat 8, originally known as the Landsat Data Continuity Mission (LDCM), is a National Aeronautics and Space Administration (NASA)-U.S. Geological Survey (USGS) partnership that continues the legacy of continuous moderate resolution observations started in 1972. The conception of LDCM to the reality of Landsat 8 followed an arduous path extending over nearly 13 years, but the successful launch on February 11, 2013 ensures the continuity of the unparalleled Landsat record. The USGS took over mission operations on May 30, 2013 and renamed LCDM to Landsat 8. Access to Landsat 8 data was opened to users worldwide. Three years following launch we evaluate the science and applications impact of Landsat 8. With a mission objective to enable the detection and characterization of global land changes at a scale where differentiation between natural and human-induced causes of change is possible, LDCM promised incremental technical improvements in capabilities needed for Landsat scientific and applications investigations. Results show that with Landsat 8, we are acquiring more data than ever before, the radiometric and geometric quality of data are generally technically superior to data acquired by past Landsat missions, and the new measurements, e.g., the coastal aerosol and cirrus bands, are opening new opportunities. Collectively, these improvements are sparking the growth of science and applications opportunities. Equally important, with Landsat 7 still operational, we have returned to global imaging on an 8-day cycle, a capability that ended when Landsat 5 ceased operational Earth imaging in November 2011. As a result, the Landsat program is on secure footings and planning is underway to extend the record for another 20 or more years.
Landsat 8: The Plans, the Reality, and the Legacy
NASA Technical Reports Server (NTRS)
Loveland, Thomas R.; Irons, James R.
2016-01-01
Landsat 8, originally known as the Landsat Data Continuity Mission (LDCM), is a National Aeronautics and Space Administration (NASA)-U.S. Geological Survey (USGS) partnership that continues the legacy of continuous moderate resolution observations started in 1972. The conception of LDCM to the reality of Landsat 8 followed an arduous path extending over nearly 13 years, but the successful launch on February 11, 2013 ensures the continuity of the unparalleled Landsat record. The USGS took over mission operations on May 30, 2013 and renamed LCDM to Landsat 8. Access to Landsat 8 data was opened to users worldwide. Three years following launch we evaluate the science and applications impact of Landsat 8. With a mission objective to enable the detection and characterization of global land changes at a scale where differentiation between natural and human-induced causes of change is possible, LDCM promised incremental technical improvements in capabilities needed for Landsat scientific and applications investigations. Results show that with Landsat 8, we are acquiring more data than ever before, the radiometric and geometric quality of data are generally technically superior to data acquired by past Landsat missions, and the new measurements, e.g., the coastal aerosol and cirrus bands, are opening new opportunities. Collectively, these improvements are sparking the growth of science and applications opportunities. Equally important, with Landsat 7 still operational, we have returned to global imaging on an 8-day cycle, a capability that ended when Landsat 5 ceased operational Earth imaging in November 2011. As a result, the Landsat program is on secure footings and planning is underway to extend the record for another 20 or more years.
[Project to enhance bone bank tissue storage and distribution procedures].
Huang, Jui-Chen; Wu, Chiung-Lan; Chen, Chun-Chuan; Chen, Shu-Hua
2011-10-01
Organ and tissue transplantation are now commonly preformed procedures. Improper organ bank handling procedures may increase infection risks. Execution accuracy in terms of tissue storage and distribution at our bone bank was 80%. We thus proposed an execution improvement project to enhance procedures in order to fulfill the intent of donors and ensure recipient safety. This project was designed to raise nurse professionalism, and ensure patient safety through enhanced tissue storage and distribution procedures. Education programs developed for this project focus on teaching standard operating procedures for bone and ligament storage and distribution, bone bank facility maintenance, trouble shooting and solutions, and periodic inspection systems. Cognition of proper storage and distribution procedures rose from 81% to 100%; Execution accuracy also rose from 80% to 100%. The project successfully conveyed concepts essential to the correct execution of organ storage and distribution procedures and proper organ bank facility management. Achieving and maintaining procedural and management standards is crucial to continued organ donations and the recipient safety.
Clinical characterization of 2D pressure field in human left ventricles
NASA Astrophysics Data System (ADS)
Borja, Maria; Rossini, Lorenzo; Martinez-Legazpi, Pablo; Benito, Yolanda; Alhama, Marta; Yotti, Raquel; Perez Del Villar, Candelas; Gonzalez-Mansilla, Ana; Barrio, Alicia; Fernandez-Aviles, Francisco; Bermejo, Javier; Khan, Andrew; Del Alamo, Juan Carlos
2014-11-01
The evaluation of left ventricle (LV) function in the clinical setting remains a challenge. Pressure gradient is a reliable and reproducible indicator of the LV function. We obtain 2D relative pressure field in the LV using in-vivo measurements obtained by processing Doppler-echocardiography images of healthy and dilated hearts. Exploiting mass conservation, we solve the Poisson pressure equation (PPE) dropping the time derivatives and viscous terms. The flow acceleration appears only in the boundary conditions, making our method weakly sensible to the time resolution of in-vivo acquisitions. To ensure continuity with respect to the discrete operator and grid used, a potential flow correction is applied beforehand, which gives another Poisson equation. The new incompressible velocity field ensures that the compatibility equation for the PPE is satisfied. Both Poisson equations are efficiently solved on a Cartesian grid using a multi-grid method and immersed boundary for the LV wall. The whole process is computationally inexpensive and could play a diagnostic role in the clinical assessment of LV function.
Guidance to Achieve Accurate Aggregate Quantitation in Biopharmaceuticals by SV-AUC.
Arthur, Kelly K; Kendrick, Brent S; Gabrielson, John P
2015-01-01
The levels and types of aggregates present in protein biopharmaceuticals must be assessed during all stages of product development, manufacturing, and storage of the finished product. Routine monitoring of aggregate levels in biopharmaceuticals is typically achieved by size exclusion chromatography (SEC) due to its high precision, speed, robustness, and simplicity to operate. However, SEC is error prone and requires careful method development to ensure accuracy of reported aggregate levels. Sedimentation velocity analytical ultracentrifugation (SV-AUC) is an orthogonal technique that can be used to measure protein aggregation without many of the potential inaccuracies of SEC. In this chapter, we discuss applications of SV-AUC during biopharmaceutical development and how characteristics of the technique make it better suited for some applications than others. We then discuss the elements of a comprehensive analytical control strategy for SV-AUC. Successful implementation of these analytical control elements ensures that SV-AUC provides continued value over the long time frames necessary to bring biopharmaceuticals to market. © 2015 Elsevier Inc. All rights reserved.
Poster — Thur Eve — 49: Unexpected Output Drops: Pitted Blackholes in Tungsten
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hudson, A; Pierce, G; University of Calgary, Department of Oncology, Calgary AB
2014-08-15
During the daily measurement of radiation output of a 6 MV beam on a Varian Trilogy Linear Accelerator the output dropped below 2% and initiated a call to action by physics to determine the cause. Over the course of weeks the cause of the issue was diagnosed to be a defect in the target, resulting in a drop in output and an asymmetry of the beam. Steps were taken to return the machine to clinical service while parts were on order while ensuring the safety of patient treatment. The machine target was replaced and the machine continues to operate asmore » expected. A drop in output is usually a rarity and a defect in the target is possibly more rare. This experience demonstrated the importance of routine QC measurement, recording and analyzing daily output and symmetry values. In addition, this event showcased the importance of a multi-disciplinary approach in a high-pressure situation to effectively troubleshoot unique events to ensure consistence, safety patient treatment.« less
Protecting the GEO Environment: Policies and Practices
NASA Technical Reports Server (NTRS)
Johnson, Nicholas L.; McKay, Gordon A. (Technical Monitor)
1999-01-01
The geosynchronous orbital regime has long been recognized as a unique space resource, dictating special measures to ensure its continuing use for future generations. During the past 20 years a variety of national and international policies have been developed to preserve this environment. A review of current practices involving the deployment and disposal of geosynchronous spacecraft, associated upper stages and apogee kick motors, and geosynchronous orbit transfer objects indicates both positive and negative trends. Most spacecraft operators are indeed performing end-of-mission maneuvers, but the boost altitudes normally fall short of policy guidelines. Russia, a major operator in geosynchronous orbit, maneuvers only 1 in 3 spacecraft out of the region, while China has never refired a spacecraft above GEO. The viability of voluntary protection measures for this regime depends upon the responsible actions of the aerospace community as a whole.
Cybersecurity Awareness in the Power Grid
DOE Office of Scientific and Technical Information (OSTI.GOV)
Scholtz, Jean; Franklin, Lyndsey; Le Blanc, Katya L.
2016-07-10
We report on a series of interviews and observations conducted with control room dispatchers in a bulk electrical system. These dispatchers must react quickly to incidents as they happen in order to ensure the reliability and safe operation of the power grid. They do not have the time to evaluate incidents for signs of cyber-attack as part of their initial response. Cyber-attack detection involves multiple personnel from a variety of roles at both local and regional levels. Smart grid technology will improve detection and defense capabilities of the future grid, however, the current infrastructure remains a mixture of old andmore » new equipment which will continue to operate for some time. Thus, research still needs to focus on strategies for the detection of malicious activity on current infrastructure as well as protection and remediation.« less
Using AUTORAD for Cassini File Uplinks: Incorporating Automated Commanding into Mission Operations
NASA Technical Reports Server (NTRS)
Goo, Sherwin
2014-01-01
As the Cassini spacecraft embarked on the Solstice Mission in October 2010, the flight operations team faced a significant challenge in planning and executing the continuing tour of the Saturnian system. Faced with budget cuts that reduced the science and engineering staff by over a third in size, new and streamlined processes had to be developed to allow the Cassini mission to maintain a high level of science data return with a lower amount of available resources while still minimizing the risk. Automation was deemed an important key in enabling mission operations with reduced workforce and the Cassini flight team has made this goal a priority for the Solstice Mission. The operations team learned about a utility called AUTORAD which would give the flight operations team the ability to program selected command files for radiation up to seven days in advance and help minimize the need for off-shift support that could deplete available staffing during the prime shift hours. This paper will describe how AUTORAD is being utilized by the Cassini flight operations team and the processes that were developed or modified to ensure that proper oversight and verification is maintained in the generation and execution of radiated command files.
Design and implementation of disaster recovery and business continuity solution for radiology PACS.
Mansoori, Bahar; Rosipko, Beverly; Erhard, Karen K; Sunshine, Jeffrey L
2014-02-01
In the digital era of radiology, picture archiving and communication system (PACS) has a pivotal role in retrieving and storing the images. Integration of PACS with all the health care information systems e.g., health information system, radiology information system, and electronic medical record has greatly improved access to patient data at anytime and anywhere throughout the entire enterprise. In such an integrated setting, seamless operation depends critically on maintaining data integrity and continuous access for all. Any failure in hardware or software could interrupt the workflow or data and consequently, would risk serious impact to patient care. Thus, any large-scale PACS now have an indispensable requirement to include deployment of a disaster recovery plan to ensure secure sources of data. This paper presents our experience with designing and implementing a disaster recovery and business continuity plan. The selected architecture with two servers in each site (local and disaster recovery (DR) site) provides four different scenarios to continue running and maintain end user service. The implemented DR at University Hospitals Health System now permits continuous access to the PACS application and its contained images for radiologists, other clinicians, and patients alike.
Walczak, Karl A.; Segev, Gideon; Larson, David M.; ...
2017-02-17
Safe and practical solar-driven hydrogen generators must be capable of efficient and stable operation under diurnal cycling with full separation of gaseous H 2 and O 2 products. In this paper, a novel architecture that fulfills all of these requirements is presented. The approach is inherently scalable and provides versatility for operation under diverse electrolyte and lighting conditions. The concept is validated using a 1 cm 2 triple-junction photovoltaic cell with its illuminated photocathode protected by a composite coating comprising an organic encapsulant with an embedded catalytic support. The device is compatible with operation under conditions ranging from 1 Mmore » H 2SO 4 to 1 M KOH, enabling flexibility in selection of semiconductor, electrolyte, membrane, and catalyst. Stable operation at a solar-to-hydrogen conversion efficiency of >10% is demonstrated under continuous operation, as well as under diurnal light cycling for at least 4 d, with simulated sunlight. Operational characteristics are validated by extended time outdoor testing. A membrane ensures products are separated, with nonexplosive gas streams generated for both alkaline and acidic systems. Finally, analysis of operational characteristics under different lighting conditions is enabled by comparison of a device model to experimental data.« less
NASA Technical Reports Server (NTRS)
Mata, Carlos T.
2003-01-01
Anadigm(registered trademark) today announced that ASRC Aerospace Corporation has designed Anadigm's dynamically reconfigurable Field Programmable Analog Array (FPAA) technology into an advanced data acquisition system developed under contract for NASA. ASRC Aerospace designed in the Anadigm(registered trademark) FPAA to provide complex analog signal conditioning in its intelligent, self-calibrating, and self-healing advanced data acquisition system (ADAS). The ADAS has potential applications in industrial, manufacturing, and aerospace markets. This system offers highly reliable operation while reducing the need for user interaction. Anadigm(registered trademark)'s dynamically reconfigurable FPAAs can be reconfigured in-system by the designer or on the fly by a microprocessor. A single device can thus be programmed to implement multiple analog functions and/or to adapt on-the-fly to maintain precision operation despite system degradation and aging. In the case of the ASRC advanced data acquisition system, the FPAA helps ensure that the system will continue to operating at 100% functionality despite changes in the environment, component degradation, and/or component failures.
LN2-free Operation of the MEG Liquid Xenon Calorimeter by using a High-power Pulse Tube Cryocooler
DOE Office of Scientific and Technical Information (OSTI.GOV)
Haruyama, T.; Kasami, K.; Nishiguchi, H.
2006-04-27
A high-power coaxial pulse tube cryocooler, originally developed in KEK and technology-transferred to Iwatani Industrial Gases Corp (IIGC), has been installed in a large liquid xenon calorimeter to evaluate liquid nitrogen-free (LN2-free) operation of the rare {mu}-particle decay experiment (MEG). Features of this pulse tube cryocooler include the cold-end heat exchanger, designed with sufficient surface area to ensure high-power cooling, and a cylindrical regenerator placed inside the pulse tube giving compact design and ease of fabrication. This production-level cryocooler provides a cooling power of {approx}200 W at 165 K, using a 6 kW Gifford-McMahon (GM)-type compressor. The paper describes themore » detailed configuration of the cryocooler, and the results of the continuous LN2-free operation of the large prototype liquid xenon calorimeter, which ran for more than 40 days without problems.« less
Modern Management Principles Come to the Dental School.
Wataha, John C; Mouradian, Wendy E; Slayton, Rebecca L; Sorensen, John A; Berg, Joel H
2016-04-01
The University of Washington School of Dentistry may be the first dental school in the nation to apply lean process management principles as a primary tool to re-engineer its operations and curriculum to produce the dentist of the future. The efficiencies realized through re-engineering will better enable the school to remain competitive and viable as a national leader of dental education. Several task forces conducted rigorous value stream analyses in a highly collaborative environment led by the dean of the school. The four areas undergoing evaluation and re-engineering were organizational infrastructure, organizational processes, curriculum, and clinic operations. The new educational model was derived by thoroughly analyzing the current state of dental education in order to design and achieve the closest possible ideal state. As well, the school's goal was to create a lean, sustainable operational model. This model aims to ensure continued excellence in restorative dental instruction and to serve as a blueprint for other public dental schools seeking financial stability in this era of shrinking state support and rising costs.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
NNSA’s third mission pillar is supporting the U.S. Navy’s ability to protect and defend American interests across the globe. The Naval Reactors Program remains at the forefront of technological developments in naval nuclear propulsion and ensures a commanding edge in warfighting capabilities by advancing new technologies and improvements in naval reactor performance and reliability. In 2015, the Naval Nuclear Propulsion Program pioneered advances in nuclear reactor and warship design – such as increasing reactor lifetimes, improving submarine operational effectiveness, and reducing propulsion plant crewing. The Naval Reactors Program continued its record of operational excellence by providing the technical expertise requiredmore » to resolve emergent issues in the Nation’s nuclear-powered fleet, enabling the Fleet to safely steam more than two million miles. Naval Reactors safely maintains, operates, and oversees the reactors on the Navy’s 82 nuclear-powered warships, constituting more than 45 percent of the Navy’s major combatants.« less
Large-scale flow experiments for managing river systems
Konrad, Christopher P.; Olden, Julian D.; Lytle, David A.; Melis, Theodore S.; Schmidt, John C.; Bray, Erin N.; Freeman, Mary C.; Gido, Keith B.; Hemphill, Nina P.; Kennard, Mark J.; McMullen, Laura E.; Mims, Meryl C.; Pyron, Mark; Robinson, Christopher T.; Williams, John G.
2011-01-01
Experimental manipulations of streamflow have been used globally in recent decades to mitigate the impacts of dam operations on river systems. Rivers are challenging subjects for experimentation, because they are open systems that cannot be isolated from their social context. We identify principles to address the challenges of conducting effective large-scale flow experiments. Flow experiments have both scientific and social value when they help to resolve specific questions about the ecological action of flow with a clear nexus to water policies and decisions. Water managers must integrate new information into operating policies for large-scale experiments to be effective. Modeling and monitoring can be integrated with experiments to analyze long-term ecological responses. Experimental design should include spatially extensive observations and well-defined, repeated treatments. Large-scale flow manipulations are only a part of dam operations that affect river systems. Scientists can ensure that experimental manipulations continue to be a valuable approach for the scientifically based management of river systems.
Intelligent Energy Management System for PV-Battery-based Microgrids in Future DC Homes
NASA Astrophysics Data System (ADS)
Chauhan, R. K.; Rajpurohit, B. S.; Gonzalez-Longatt, F. M.; Singh, S. N.
2016-06-01
This paper presents a novel intelligent energy management system (IEMS) for a DC microgrid connected to the public utility (PU), photovoltaic (PV) and multi-battery bank (BB). The control objectives of the proposed IEMS system are: (i) to ensure the load sharing (according to the source capacity) among sources, (ii) to reduce the power loss (high efficient) in the system, and (iii) to enhance the system reliability and power quality. The proposed IEMS is novel because it follows the ideal characteristics of the battery (with some assumptions) for the power sharing and the selection of the closest source to minimize the power losses. The IEMS allows continuous and accurate monitoring with intelligent control of distribution system operations such as battery bank energy storage (BBES) system, PV system and customer utilization of electric power. The proposed IEMS gives the better operational performance for operating conditions in terms of load sharing, loss minimization, and reliability enhancement of the DC microgrid.
Laterally Coupled Quantum-Dot Distributed-Feedback Lasers
NASA Technical Reports Server (NTRS)
Qui, Yueming; Gogna, Pawan; Muller, Richard; Maker, paul; Wilson, Daniel; Stintz, Andreas; Lester, Luke
2003-01-01
InAs quantum-dot lasers that feature distributed feedback and lateral evanescent- wave coupling have been demonstrated in operation at a wavelength of 1.3 m. These lasers are prototypes of optical-communication oscillators that are required to be capable of stable single-frequency, single-spatial-mode operation. A laser of this type (see figure) includes an active layer that comprises multiple stacks of InAs quantum dots embedded within InGaAs quantum wells. Distributed feedback is provided by gratings formed on both sides of a ridge by electron lithography and reactive-ion etching on the surfaces of an AlGaAs/GaAs waveguide. The lateral evanescent-wave coupling between the gratings and the wave propagating in the waveguide is strong enough to ensure operation at a single frequency, and the waveguide is thick enough to sustain a stable single spatial mode. In tests, the lasers were found to emit continuous-wave radiation at temperatures up to about 90 C. Side modes were found to be suppressed by more than 30 dB.
The Czech Hydrometeorological Institute's severe storm nowcasting system
NASA Astrophysics Data System (ADS)
Novak, Petr
2007-02-01
To satisfy requirements for operational severe weather monitoring and prediction, the Czech Hydrometeorological Institute (CHMI) has developed a severe storm nowcasting system which uses weather radar data as its primary data source. Previous CHMI studies identified two methods of radar echo prediction, which were then implemented during 2003 into the Czech weather radar network operational weather processor. The applications put into operations were the Continuity Tracking Radar Echoes by Correlation (COTREC) algorithm, and an application that predicts future radar fields using the wind field derived from the geopotential at 700 hPa calculated from a local numerical weather prediction model (ALADIN). To ensure timely delivery of the prediction products to the users, the forecasts are implemented into a web-based viewer (JSMeteoView) that has been developed by the CHMI Radar Department. At present, this viewer is used by all CHMI forecast offices for versatile visualization of radar and other meteorological data (Meteosat, lightning detection, NWP LAM output, SYNOP data) in the Internet/Intranet environment, and the viewer has detailed geographical navigation capabilities.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Krad, Ibrahim; Gao, David Wenzhong; Ibanez, Eduardo
2016-12-01
The electric power system has continuously evolved in order to accommodate new technologies and operating strategies. As the penetration of integrated variable generation in the system increases, it is beneficial to develop strategies that can help mitigate their effect on the grid. Historically, power system operators have held excess capacity during the commitment and dispatch process to allow the system to handle unforeseen load ramping events. As variable generation resources increase, sufficient flexibility scheduled in the system is required to ensure that system performance is not deteriorated in the presence of additional variability and uncertainty. This paper presents a systematicmore » comparison of various flexibility reserve strategies. Several of them are implemented and applied in a common test system, in order to evaluate their effect on the economic and reliable operations. Furthermore, a three stage reserve modifier algorithm is proposed and evaluated for its ability to improve system performance.« less
40 CFR 146.88 - Injection well operating requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
..., the owner or operator must ensure that injection pressure does not exceed 90 percent of the fracture pressure of the injection zone(s) so as to ensure that the injection does not initiate new fractures or propagate existing fractures in the injection zone(s). In no case may injection pressure initiate fractures...
40 CFR 146.88 - Injection well operating requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
..., the owner or operator must ensure that injection pressure does not exceed 90 percent of the fracture pressure of the injection zone(s) so as to ensure that the injection does not initiate new fractures or propagate existing fractures in the injection zone(s). In no case may injection pressure initiate fractures...
40 CFR 146.88 - Injection well operating requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
..., the owner or operator must ensure that injection pressure does not exceed 90 percent of the fracture pressure of the injection zone(s) so as to ensure that the injection does not initiate new fractures or propagate existing fractures in the injection zone(s). In no case may injection pressure initiate fractures...
40 CFR 146.88 - Injection well operating requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
..., the owner or operator must ensure that injection pressure does not exceed 90 percent of the fracture pressure of the injection zone(s) so as to ensure that the injection does not initiate new fractures or propagate existing fractures in the injection zone(s). In no case may injection pressure initiate fractures...
21 CFR 212.20 - What activities must I perform to ensure drug quality?
Code of Federal Regulations, 2014 CFR
2014-04-01
... operations. You must oversee production operations to ensure that each PET drug meets the requirements of the... of a PET drug. (c) Specifications and processes. You must approve or reject, before implementation..., and purity of a PET drug. You must demonstrate that any change does not adversely affect the identity...
21 CFR 212.20 - What activities must I perform to ensure drug quality?
Code of Federal Regulations, 2012 CFR
2012-04-01
... operations. You must oversee production operations to ensure that each PET drug meets the requirements of the... of a PET drug. (c) Specifications and processes. You must approve or reject, before implementation..., and purity of a PET drug. You must demonstrate that any change does not adversely affect the identity...
21 CFR 212.20 - What activities must I perform to ensure drug quality?
Code of Federal Regulations, 2013 CFR
2013-04-01
... operations. You must oversee production operations to ensure that each PET drug meets the requirements of the... of a PET drug. (c) Specifications and processes. You must approve or reject, before implementation..., and purity of a PET drug. You must demonstrate that any change does not adversely affect the identity...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-15
... safety of the offshore facility, including ensuring that all contractors and subcontractors have safety... safety analysis (task level); (3) Procedures to verify that contractors are conducting their activities in accordance with the operator's SEMS program and an evaluation to ensure that contractors have the...
Lee, E A; Jun, S K
2001-09-01
Since implant therapy must be dictated by prosthetic requirements, a protocol for the comprehensive and continuous integration of the restorative blueprint through the entire treatment planning and clinical execution phases is mandatory. This article demonstrates a systematic approach where the establishment of a final restorative treatment objective is incorporated into the diagnosis and subsequently integrated through every phase of clinical execution. Design continuity is ensured, and multidisciplinary cohesiveness is enhanced by providing clearly defined treatment objectives to every member of the clinical team.
NASA Technical Reports Server (NTRS)
Patterson, Linda P.
2001-01-01
The International Space Station (ISS) has an operational mission and profile that makes it a Logistics and Maintenance (L&M) support challenge different from previous programs. It is permanently manned, assembled on orbit, and multi-national. With this technical and operational challenge, a unique approach is needed to support the hardware and crew. The key is the integration of on-orbit and ground analysis, supply, maintenance, and crew training into a coherent functional process that supports ISS goals and objectives. To integrate all the necessary aspects of hardware and personnel to support on-orbit maintenance, a myriad of products and processes must be created and coordinated, such that the right resources are in the right place at the right time to ensure continued ISS functionality. This paper will familiarize the audience with ISS On-Orbit Maintenance (OOM) concepts and capabilities for different maintenance tasks and discuss some of the logic behind their selection. It will also identify the operational maintenance support responsibility split between the U.S. and the various International Partners (IPs).
International Space Station Major Constituent Analyzer On-Orbit Performance
NASA Technical Reports Server (NTRS)
Gardner, Ben D.; Erwin, Philip M.; Thoresen, Souzan; Granahan, John; Matty, Chris
2011-01-01
The Major Constituent Analyzer (MCA) is an integral part of the International Space Station (ISS) Environmental Control and Life Support System (ECLSS). The MCA is a mass spectrometer-based instrument designed to provide critical monitoring of six major atmospheric constituents; nitrogen, oxygen, hydrogen, carbon dioxide, methane, and water vapor. These gases are sampled continuously and automatically in all United States On-Orbit Segment (USOS) modules via the Sample Distribution System (SDS). The MCA is the primary tool for management of atmosphere constituents and is therefore critical for ensuring a habitable ISS environment during both nominal ISS operations and campout EVA preparation in the Airlock. The MCA has been in operation in the US Destiny Laboratory Module for over 10 years, and a second MCA has been delivered to the ISS for Node 3 operation. This paper discusses the performance of the MCA over the two past year, with particular attention to lessons learned regarding the operational life of critical components. Recent data have helped drive design upgrades for a new set of orbit-replaceable units (ORUs) currently in production. Several ORU upgrades are expected to increase expected lifetimes and reliability.
NASA Astrophysics Data System (ADS)
Pries, V. V.; Proskuriakov, N. E.
2018-04-01
To control the assembly quality of multi-element mass-produced products on automatic rotor lines, control methods with operational feedback are required. However, due to possible failures in the operation of the devices and systems of automatic rotor line, there is always a real probability of getting defective (incomplete) products into the output process stream. Therefore, a continuous sampling control of the products completeness, based on the use of statistical methods, remains an important element in managing the quality of assembly of multi-element mass products on automatic rotor lines. The feature of continuous sampling control of the multi-element products completeness in the assembly process is its breaking sort, which excludes the possibility of returning component parts after sampling control to the process stream and leads to a decrease in the actual productivity of the assembly equipment. Therefore, the use of statistical procedures for continuous sampling control of the multi-element products completeness when assembled on automatic rotor lines requires the use of such sampling plans that ensure a minimum size of control samples. Comparison of the values of the limit of the average output defect level for the continuous sampling plan (CSP) and for the automated continuous sampling plan (ACSP) shows the possibility of providing lower limit values for the average output defects level using the ACSP-1. Also, the average sample size when using the ACSP-1 plan is less than when using the CSP-1 plan. Thus, the application of statistical methods in the assembly quality management of multi-element products on automatic rotor lines, involving the use of proposed plans and methods for continuous selective control, will allow to automating sampling control procedures and the required level of quality of assembled products while minimizing sample size.
Quality improvement in hospitals: how much does it reduce healthcare costs?
Jones, S B
1995-01-01
The philosophy of W.E. Deming suggests that continuous quality improvement efforts, when properly applied, ultimately will lead to financial dividends and will help ensure business longevity. Reducing hospital charges can be exciting for the participants and can provide an impetus for expanding quality improvement efforts. Americans, however, tend to demand almost instant gratification and have limited patience for longer-term results. This factor, coupled with minimal knowledge of actual operational costs and inaccurate charge accounting systems, may lead hospital managers to misinterpret the potential net long-term effects of their quality improvement efforts. In the approaching environment of capitated reimbursement, such mistakes may have serious consequences.
The "big bang" implementation: not for the faint of heart.
Anderson, Linda K; Stafford, Cynthia J
2002-01-01
Replacing a hospital's obsolete mainframe computer system with a modern integrated clinical and administrative information system presents multiple challenges. When the new system is activated in one weekend, in "big bang" fashion, the challenges are magnified. Careful planning is essential to ensure that all hospital staff are fully prepared for this transition, knowing this conversion will involve system downtime, procedural changes, and the resulting stress that naturally accompanies change. Implementation concerns include staff preparation and training, process changes, continuity of patient care, and technical and administrative support. This article outlines how the University of Missouri Health Care addressed these operational concerns during this dramatic information system conversion.
Drachal, Marcin
2017-01-01
Using case studies of the Ebola outbreak in Western Africa in 2014, and the terrorist attacks in Paris and Brussels in 2015 and 2016 respectively, this paper demonstrates how various resilience-related corporate functions contributed to effective crisis response. This paper describes the logical order of actions taken in each of the cases, and how the organisation prioritised its assets and coordinated activities to ensure the response was adequate, efficient and timely. The article demonstrates how business continuity, physical security, threat management, security intelligence and incident management worked together to support the organisation's crisis management structures in complex crisis situations.
NATIONAL GEOSCIENCE DATA REPOSITORY SYSTEM PHASE III: IMPLEMENTATION AND OPERATION OF THE REPOSITORY
DOE Office of Scientific and Technical Information (OSTI.GOV)
Marcus Milling
2003-04-01
The NGDRS has facilitated 85% of cores, cuttings, and other data identified available for transfer to the public sector. Over 12 million linear feet of cores and cuttings, in addition to large numbers of paleontological samples and are now available for public use. To date, with industry contributions for program operations and data transfers, the NGDRS project has realized a 6.5 to 1 return on investment to Department of Energy funds. Large-scale transfers of seismic data have been evaluated, but based on the recommendation of the NGDRS steering committee, cores have been given priority because of the vast scale ofmore » the seismic data problem relative to the available funding. The rapidly changing industry conditions have required that the primary core and cuttings preservation strategy evolve as well. Additionally, the NGDRS clearinghouse is evaluating the viability of transferring seismic data covering the western shelf of the Florida Gulf Coast. AGI remains actively involved in working to realize the vision of the National Research Council's report of geoscience data preservation. GeoTrek has been ported to Linux and MySQL, ensuring a purely open-source version of the software. This effort is key in ensuring long-term viability of the software so that is can continue basic operation regardless of specific funding levels. Work has commenced on a major revision of GeoTrek, using the open-source MapServer project and its related MapScript language. This effort will address a number of key technology issues that appear to be rising for 2002, including the discontinuation of the use of Java in future Microsoft operating systems. Discussions have been held regarding establishing potential new public data repositories, with hope for final determination in 2002.« less
IMPLEMENTATION AND OPERATION OF THE REPOSITORY
DOE Office of Scientific and Technical Information (OSTI.GOV)
Marcus Milling
2003-10-01
The NGDRS has facilitated 85% of cores, cuttings, and other data identified available for transfer to the public sector. Over 12 million linear feet of cores and cuttings, in addition to large numbers of paleontological samples and are now available for public use. To date, with industry contributions for program operations and data transfers, the NGDRS project has realized a 6.5 to 1 return on investment to Department of Energy funds. Large-scale transfers of seismic data have been evaluated, but based on the recommendation of the NGDRS steering committee, cores have been given priority because of the vast scale ofmore » the seismic data problem relative to the available funding. The rapidly changing industry conditions have required that the primary core and cuttings preservation strategy evolve as well. Additionally, the NGDRS clearinghouse is evaluating the viability of transferring seismic data covering the western shelf of the Florida Gulf Coast. AGI remains actively involved in working to realize the vision of the National Research Council's report of geoscience data preservation. GeoTrek has been ported to Linux and MySQL, ensuring a purely open-source version of the software. This effort is key in ensuring long-term viability of the software so that is can continue basic operation regardless of specific funding levels. Work has been on a major revision of GeoTrek, using the open-source MapServer project and its related MapScript language. This effort will address a number of key technology issues that appear to be rising for 2003, including the discontinuation of the use of Java in future Microsoft operating systems. The recent donation of BPAmoco's Houston core facility to the Texas Bureau of Economic Geology has provided substantial short-term relief of the space constraints for public repository space.« less
NATIONAL GEOSCIENCE DATA REPOSITORY SYSTEM PHASE III: IMPLEMENTATION AND OPERATION OF THE REPOSITORY
DOE Office of Scientific and Technical Information (OSTI.GOV)
Marcus Milling
2002-10-01
The NGDRS has facilitated 85% of cores, cuttings, and other data identified available for transfer to the public sector. Over 12 million linear feet of cores and cuttings, in addition to large numbers of paleontological samples and are now available for public use. To date, with industry contributions for program operations and data transfers, the NGDRS project has realized a 6.5 to 1 return on investment to Department of Energy funds. Large-scale transfers of seismic data have been evaluated, but based on the recommendation of the NGDRS steering committee, cores have been given priority because of the vast scale ofmore » the seismic data problem relative to the available funding. The rapidly changing industry conditions have required that the primary core and cuttings preservation strategy evolve as well. Additionally, the NGDRS clearinghouse is evaluating the viability of transferring seismic data covering the western shelf of the Florida Gulf Coast. AGI remains actively involved in working to realize the vision of the National Research Council's report of geoscience data preservation. GeoTrek has been ported to Linux and MySQL, ensuring a purely open-source version of the software. This effort is key in ensuring long-term viability of the software so that is can continue basic operation regardless of specific funding levels. Work has commenced on a major revision of GeoTrek, using the open-source MapServer project and its related MapScript language. This effort will address a number of key technology issues that appear to be rising for 2002, including the discontinuation of the use of Java in future Microsoft operating systems. Discussions have been held regarding establishing potential new public data repositories, with hope for final determination in 2002.« less
Advanced planning for ISS payload ground processing
NASA Astrophysics Data System (ADS)
Page, Kimberly A.
2000-01-01
Ground processing at John F. Kennedy Space Center (KSC) is the concluding phase of the payload/flight hardware development process and is the final opportunity to ensure safe and successful recognition of mission objectives. Planning for the ground processing of on-orbit flight hardware elements and payloads for the International Space Station is a responsibility taken seriously at KSC. Realizing that entering into this operational environment can be an enormous undertaking for a payload customer, KSC continually works to improve this process by instituting new/improved services for payload developer/owner, applying state-of-the-art technologies to the advanced planning process, and incorporating lessons learned for payload ground processing planning to ensure complete customer satisfaction. This paper will present an overview of the KSC advanced planning activities for ISS hardware/payload ground processing. It will focus on when and how KSC begins to interact with the payload developer/owner, how that interaction changes (and grows) throughout the planning process, and how KSC ensures that advanced planning is successfully implemented at the launch site. It will also briefly consider the type of advance planning conducted by the launch site that is transparent to the payload user but essential to the successful processing of the payload (i.e. resource allocation, executing documentation, etc.) .
ERIC Educational Resources Information Center
US Department of Education, 2009
2009-01-01
As the Centers for Disease Control (CDC) releases its "Guidance for School Responses to Influenza During the 2009-2010 School Year," the U.S. Department of Education reminds states, districts, schools, students, staff, families, and communities about the importance of ensuring the continuity of learning in the event of student or school…
ERIC Educational Resources Information Center
US Department of Education, 2014
2014-01-01
The U.S. Department of Education (ED) wishes to remind states, districts, schools, students, staff, families, and guardians as well as communities about the importance of: (1) addressing the prevention of infectious disease in schools, including the seasonal flu, viral meningitis, enterovirus, and Ebola; and (2) ensuring the continuity of teaching…
Halsne, Julia
2015-01-01
The East Bay Municipal Utility District provides potable water to approximately 1.3 million customers and treats wastewater for approximately 680,000 customers on the eastern side of San Francisco Bay in Northern California. Corporate policy requires the District to create and maintain an active emergency preparedness programme to manage its critical functions during an emergency and protect people, property and the environment. The policy also requires the District to create and maintain a business continuity programme to minimise disruptions of critical business functions and enhance its capability to recover operations. For these programmes to work effectively they must be coordinated. As the programmes at the District have evolved, the natural interrelationship, overlaps and integration have become inherent in their success. To ensure integration and coordination of these programmes, the District has developed management systems to effectively drive towards a seamless overarching programme.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Xu, Gangyi, E-mail: gangyi.xu@mail.sitp.ac.cn; Key Laboratory of Infrared Imaging Materials and Detectors, Shanghai Institute of Technical Physics, Chinese Academy of Sciences, Shanghai 200083; Li, Lianhe
2014-03-03
We demonstrate efficient surface-emitting terahertz frequency quantum cascade lasers with continuous wave output powers of 20–25 mW at 15 K and maximum operating temperatures of 80–85 K. The devices employ a resonant-phonon depopulation active region design with injector, and surface emission is realized using resonators based on graded photonic heterostructures (GPHs). GPHs can be regarded as energy wells for photons and have recently been implemented through grading the period of the photonic structure. In this paper, we show that it is possible to keep the period constant and grade instead the lateral metal coverage across the GPH. This strategy ensures spectrally single-mode operationmore » across the whole laser dynamic range and represents an additional degree of freedom in the design of confining potentials for photons.« less
TDRS-L spacecraft lift to mate on Atlas V
2014-01-13
CAPE CANAVERAL, Fla. – At Cape Canaveral Air Force Station's Vertical Integration Facility at Launch Complex 41, NASA's Tracking and Data Relay Satellite, or TDRS-L, spacecraft is lifted for mounting atop a United Launch Alliance Atlas V rocket. The TDRS-L satellite will be a part of the second of three next-generation spacecraft designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop a United Launch Alliance Atlas V rocket on Jan. 23, 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay contact with orbiting spacecraft ranging from the International Space Station and Hubble Space Telescope to the array of scientific observatories. For more information, visit: http://www.nasa.gov/mission_pages/tdrs/home/index.html Photo credit: NASA/Dimitri Gerondidakis
TDRS-L spacecraft lift to mate on Atlas V
2014-01-13
CAPE CANAVERAL, Fla. – At Cape Canaveral Air Force Station's Vertical Integration Facility at Launch Complex 41, NASA's Tracking and Data Relay Satellite, or TDRS-L, spacecraft is moved into position for mating atop a United Launch Alliance Atlas V rocket. The TDRS-L satellite will be a part of the second of three next-generation spacecraft designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop a United Launch Alliance Atlas V rocket on Jan. 23, 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay contact with orbiting spacecraft ranging from the International Space Station and Hubble Space Telescope to the array of scientific observatories. For more information, visit: http://www.nasa.gov/mission_pages/tdrs/home/index.html Photo credit: NASA/Dimitri Gerondidakis
TDRS-L Spacecraft Fairing Encapsulation
2014-01-08
TITUSVILLE, Fla. – Inside the Astrotech payload processing facility in Titusville, United Launch Alliance engineers and technicians encapsulate the Tracking and Data Relay Satellite, or TDRS-L, spacecraft in its payload fairing. TDRS-L will then be transported to Launch Complex 41 at Cape Canaveral Air Force Station. The TDRS-L satellite will be a part of the second of three next-generation spacecraft designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop a United Launch Alliance Atlas V rocket on January 23, 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay contact with orbiting spacecraft ranging from the International Space Station and Hubble Space Telescope to the array of scientific observatories. For more information, visit: http://www.nasa.gov/mission_pages/tdrs/home/index.html
TDRS-L Spacecraft Fairing Encapsulation
2014-01-08
TITUSVILLE, Fla. – Inside the Astrotech payload processing facility in Titusville NASA's Tracking and Data Relay Satellite, or TDRS-L, spacecraft is being encapsulated in its payload fairing prior to being transported to Launch Complex 41 at Cape Canaveral Air Force Station. The TDRS-L satellite will be a part of the second of three next-generation spacecraft designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop a United Launch Alliance Atlas V rocket on January 23, 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay contact with orbiting spacecraft ranging from the International Space Station and Hubble Space Telescope to the array of scientific observatories. For more information, visit: http://www.nasa.gov/mission_pages/tdrs/home/index.html
TDRS-L Spacecraft Fairing Encapsulation
2014-01-08
TITUSVILLE, Fla. – Inside the Astrotech payload processing facility in Titusville, the Tracking and Data Relay Satellite, or TDRS-L, spacecraft is being encapsulated in its payload fairing in preparation for begin transported to Launch Complex 41 at Cape Canaveral Air Force Station. The TDRS-L satellite will be a part of the second of three next-generation spacecraft designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop a United Launch Alliance Atlas V rocket on January 23, 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay contact with orbiting spacecraft ranging from the International Space Station and Hubble Space Telescope to the array of scientific observatories. For more information, visit: http://www.nasa.gov/mission_pages/tdrs/home/index.html
TDRS-L Spacecraft Fairing Encapsulation
2014-01-08
TITUSVILLE, Fla. – Inside the Astrotech payload processing facility in Titusville, NASA's Tracking and Data Relay Satellite, or TDRS-L, spacecraft has been encapsulated in its payload fairing. TDRS-L will then be transported to Launch Complex 41 at Cape Canaveral Air Force Station. The TDRS-L satellite will be a part of the second of three next-generation spacecraft designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop a United Launch Alliance Atlas V rocket on January 23, 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay contact with orbiting spacecraft ranging from the International Space Station and Hubble Space Telescope to the array of scientific observatories. For more information, visit: http://www.nasa.gov/mission_pages/tdrs/home/index.html
TDRS-L Spacecraft is Lifted Onto Transporter
2014-01-10
TITUSVILLE, Fla. – Encapsulated in its payload fairing, NASA's Tracking and Data Relay Satellite, or TDRS-L, spacecraft is being mounted on a transporter for its trip from the Astrotech payload processing facility in Titusville to Launch Complex 41 at Cape Canaveral Air Force Station. The TDRS-L satellite will be a part of the second of three next-generation spacecraft designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop a United Launch Alliance Atlas V rocket on January 23, 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay contact with orbiting spacecraft ranging from the International Space Station and Hubble Space Telescope to the array of scientific observatories. For more information, visit: http://www.nasa.gov/mission_pages/tdrs/home/index.html Photo credit: NASA/Kim Shiflett
TDRS-L Spacecraft Transported from Astrotech to SLC
2014-01-13
TITUSVILLE, Fla. – Encapsulated in its payload fairing, NASA's Tracking and Data Relay Satellite, or TDRS-L, spacecraft begins it trip from the Astrotech payload processing facility in Titusville to Launch Complex 41 at Cape Canaveral Air Force Station. The TDRS-L satellite will be a part of the second of three next-generation spacecraft designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop a United Launch Alliance Atlas V rocket on January 23, 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay contact with orbiting spacecraft ranging from the International Space Station and Hubble Space Telescope to the array of scientific observatories. For more information, visit: http://www.nasa.gov/mission_pages/tdrs/home/index.html Photo credit: NASA/Dimitri Gerondidakis
TDRS-L Spacecraft Transported from Astrotech to SLC
2014-01-13
CAPE CANAVERAL, Fla. – Encapsulated in its payload fairing, NASA's Tracking and Data Relay Satellite, or TDRS-L, spacecraft arrives at Cape Canaveral Air Force Station's Vertical Integration Facility at Launch Complex 41. The TDRS-L satellite will be a part of the second of three next-generation spacecraft designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop a United Launch Alliance Atlas V rocket on January 23, 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay contact with orbiting spacecraft ranging from the International Space Station and Hubble Space Telescope to the array of scientific observatories. For more information, visit: http://www.nasa.gov/mission_pages/tdrs/home/index.html Photo credit: NASA/Dimitri Gerondidakis
2013-12-13
CAPE CANAVERAL, Fla. – The United Launch Alliance Centaur second stage that will help boost the Tracking and Data Relay Satellite, or TDRS-L, spacecraft into orbit arrives at Cape Canaveral Air Force Station's Launch Complex 41. It will be lifted and mounted atop the Atlas V first stage already in position inside the Vertical Integration Facility. TDRS-L is the second of three next-generation satellites designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay service to missions such as the Hubble Space Telescope and International Space Station. For more information, visit: http://www.nasa.gov/content/tracking-and-data-relay-satellite-tdrs/ Photo credit: NASA/Charisse Nahser
TDRS-L spacecraft lift to mate on Atlas V
2014-01-13
CAPE CANAVERAL, Fla. – At Cape Canaveral Air Force Station's Vertical Integration Facility at Launch Complex 41, NASA's Tracking and Data Relay Satellite, or TDRS-L, spacecraft has been mated atop a United Launch Alliance Atlas V rocket. The TDRS-L satellite will be a part of the second of three next-generation spacecraft designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop a United Launch Alliance Atlas V rocket on Jan. 23, 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay contact with orbiting spacecraft ranging from the International Space Station and Hubble Space Telescope to the array of scientific observatories. For more information, visit: http://www.nasa.gov/mission_pages/tdrs/home/index.html Photo credit: NASA/Dimitri Gerondidakis
TDRS-L Spacecraft is Lifted Onto Transporter
2014-01-10
TITUSVILLE, Fla. – Inside the Astrotech payload processing facility in Titusville, NASA's Tracking and Data Relay Satellite, or TDRS-L, spacecraft has been encapsulated in its payload fairing in preparation for begin transported to Launch Complex 41 at Cape Canaveral Air Force Station. The TDRS-L satellite will be a part of the second of three next-generation spacecraft designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop a United Launch Alliance Atlas V rocket on January 23, 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay contact with orbiting spacecraft ranging from the International Space Station and Hubble Space Telescope to the array of scientific observatories. For more information, visit: http://www.nasa.gov/mission_pages/tdrs/home/index.html Photo credit: NASA/Kim Shiflett
TDRS-L Spacecraft Fairing Encapsulation
2014-01-08
TITUSVILLE, Fla. – Inside the Astrotech payload processing facility in Titusville, the Tracking and Data Relay Satellite, or TDRS-L, spacecraft is being encapsulated in its payload fairing in preparation for being transported to Launch Complex 41 at Cape Canaveral Air Force Station. The TDRS-L satellite will be a part of the second of three next-generation spacecraft designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop a United Launch Alliance Atlas V rocket on January 23, 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay contact with orbiting spacecraft ranging from the International Space Station and Hubble Space Telescope to the array of scientific observatories. For more information, visit: http://www.nasa.gov/mission_pages/tdrs/home/index.html
TDRS-L Spacecraft Transported from Astrotech to SLC
2014-01-13
CAPE CANAVERAL, Fla. – Encapsulated in its payload fairing, NASA's Tracking and Data Relay Satellite, or TDRS-L, spacecraft is transported along the Saturn Causeway at the Kennedy Space Center on its way to Launch Complex 41 at Cape Canaveral Air Force Station. The TDRS-L satellite will be a part of the second of three next-generation spacecraft designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop a United Launch Alliance Atlas V rocket on January 23, 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay contact with orbiting spacecraft ranging from the International Space Station and Hubble Space Telescope to the array of scientific observatories. For more information, visit: http://www.nasa.gov/mission_pages/tdrs/home/index.html Photo credit: NASA/Dimitri Gerondidakis
TDRS-L Spacecraft Fairing Encapsulation
2014-01-08
TITUSVILLE, Fla. – Inside the Astrotech payload processing facility in Titusville, NASA's Tracking and Data Relay Satellite, or TDRS-L, spacecraft is being encapsulated in its payload fairing in preparation for begin transported to Launch Complex 41 at Cape Canaveral Air Force Station. The TDRS-L satellite will be a part of the second of three next-generation spacecraft designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop a United Launch Alliance Atlas V rocket on January 23, 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay contact with orbiting spacecraft ranging from the International Space Station and Hubble Space Telescope to the array of scientific observatories. For more information, visit: http://www.nasa.gov/mission_pages/tdrs/home/index.html
TDRS-L spacecraft lift to mate on Atlas V
2014-01-13
CAPE CANAVERAL, Fla. – Encapsulated in its payload fairing, NASA's Tracking and Data Relay Satellite, or TDRS-L, spacecraft arrives at Cape Canaveral Air Force Station's Vertical Integration Facility at Launch Complex 41. The TDRS-L satellite will be a part of the second of three next-generation spacecraft designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop a United Launch Alliance Atlas V rocket on Jan. 23, 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay contact with orbiting spacecraft ranging from the International Space Station and Hubble Space Telescope to the array of scientific observatories. For more information, visit: http://www.nasa.gov/mission_pages/tdrs/home/index.html Photo credit: NASA/Dimitri Gerondidakis
2014-01-03
TITUSVILLE, Fla. – Inside the Astrotech payload processing facility in Titusville, members of the news media are given an opportunity for an up-close look at the payload fairing that will encapsulate the Tracking and Data Relay Satellite, or TDRS-L, spacecraft. Journalists visited Astrotech as part of TDRS-L Media Day to conduct interviews and photograph the satellite that will be a part of the second of three next-generation spacecraft designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay contact with orbiting spacecraft ranging from the International Space Station and Hubble Space Telescope to the array of scientific observatories. For more information, visit: http://www.nasa.gov/mission_pages/tdrs/home/index.html
DOE Office of Scientific and Technical Information (OSTI.GOV)
Baranowski, S.T.; Culp, L.R.; Jonas, T.S.
1995-12-31
The Clean Air Act Amendments of 1990 require all Phase 1 and 2 utilities to install Continuous Emissions Monitoring Systems (CEMS), which can consist of instrumentation including analyzers and a Data Acquisition and Handling System (DAHS). To meet these requirements, Basin Electric Power Cooperative contracted with Black and Veatch to design and develop a DAHS which would meet all 40 CFR Part 75 requirements. Basin Electric provided the specifications for the DAHS and the graphical user interface, and B and V designed, developed, and installed a DAHS at 3 units at Laramie River Station, 2 units at Antelope Valley Station,more » and 2 units at Leland Olds Station. B and V utilized the existing equipment, adding to it a unique DAHS design. B and V designed and implemented the DAHS which operates in the OS/2 environment to interface with multiple programmable logic controllers. This unique software was written in modular form so that multiple programs run in unison, monitoring each other for errors to ensure continuous operation. The reporting structure is flexible to allow for a variety of formats, including those specifically required by the state to meet CAAA guidelines. Today, these seven units are in operation and comply with the CAAA. This paper describes the issues faced during specification, general design, compliance, and implementation of the DAHS at BEPC, including the lessons learned. The continuous emissions monitoring (CEM) system for each unit at BEPC consisted of a set of dilution probe analyzers for measuring SO{sub 2}, NO{sub x}, and CO{sub 2}.« less
Code of Federal Regulations, 2011 CFR
2011-10-01
... Federal coal; ensure production practices that prevent wasting or loss of coal or other resources; avoid unnecessary damage to coal-bearing or mineral-bearing formations; ensure MER of Federal coal; ensure that... regulation of surface and underground coal mining operations; require an accurate record and accounting of...
Code of Federal Regulations, 2012 CFR
2012-10-01
... Federal coal; ensure production practices that prevent wasting or loss of coal or other resources; avoid unnecessary damage to coal-bearing or mineral-bearing formations; ensure MER of Federal coal; ensure that... regulation of surface and underground coal mining operations; require an accurate record and accounting of...
Code of Federal Regulations, 2013 CFR
2013-10-01
... Federal coal; ensure production practices that prevent wasting or loss of coal or other resources; avoid unnecessary damage to coal-bearing or mineral-bearing formations; ensure MER of Federal coal; ensure that... regulation of surface and underground coal mining operations; require an accurate record and accounting of...
Code of Federal Regulations, 2014 CFR
2014-10-01
... Federal coal; ensure production practices that prevent wasting or loss of coal or other resources; avoid unnecessary damage to coal-bearing or mineral-bearing formations; ensure MER of Federal coal; ensure that... regulation of surface and underground coal mining operations; require an accurate record and accounting of...
Krad, Ibrahim; Gao, David Wenzhong; Ela, Erik; ...
2017-06-07
The electric power industry landscape is continually evolving. As emerging technologies such as wind and solar generating systems become more cost effective, traditional power system operating strategies will need to be re-evaluated. The presence of wind and solar generation (commonly referred to as variable generation or VG) can increase variability and uncertainty in the net-load profile. One mechanism to mitigate this issue is to schedule and dispatch additional operating reserves. These operating reserves aim to ensure that there is enough capacity online in the system to account for the increased variability and uncertainty occurring at finer temporal resolutions. A newmore » operating reserve strategy, referred to as flexibility reserve, has been introduced in some regions. A similar implementation is explored in this study, and its implications on power system operations are analyzed. Results show that flexibility reserve products can improve economic metrics, particularly in significantly reducing the number of scarcity pricing events, with minimal impacts on reliability metrics and production costs. Furthermore, the production costs increased due to increased VG curtailment - i.e. including the flexible ramping product in the commitment of excess thermal capacity that needed to remain online at the expense of VG output.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Krad, Ibrahim; Gao, David Wenzhong; Ela, Erik
The electric power industry landscape is continually evolving. As emerging technologies such as wind and solar generating systems become more cost effective, traditional power system operating strategies will need to be re-evaluated. The presence of wind and solar generation (commonly referred to as variable generation or VG) can increase variability and uncertainty in the net-load profile. One mechanism to mitigate this issue is to schedule and dispatch additional operating reserves. These operating reserves aim to ensure that there is enough capacity online in the system to account for the increased variability and uncertainty occurring at finer temporal resolutions. A newmore » operating reserve strategy, referred to as flexibility reserve, has been introduced in some regions. A similar implementation is explored in this study, and its implications on power system operations are analyzed. Results show that flexibility reserve products can improve economic metrics, particularly in significantly reducing the number of scarcity pricing events, with minimal impacts on reliability metrics and production costs. Furthermore, the production costs increased due to increased VG curtailment - i.e. including the flexible ramping product in the commitment of excess thermal capacity that needed to remain online at the expense of VG output.« less
Mark, Lynette J; Herzer, Kurt R; Cover, Renee; Pandian, Vinciya; Bhatti, Nasir I; Berkow, Lauren C; Haut, Elliott R; Hillel, Alexander T; Miller, Christina R; Feller-Kopman, David J; Schiavi, Adam J; Xie, Yanjun J; Lim, Christine; Holzmueller, Christine; Ahmad, Mueen; Thomas, Pradeep; Flint, Paul W; Mirski, Marek A
2015-07-01
Difficult airway cases can quickly become emergencies, increasing the risk of life-threatening complications or death. Emergency airway management outside the operating room is particularly challenging. We developed a quality improvement program-the Difficult Airway Response Team (DART)-to improve emergency airway management outside the operating room. DART was implemented by a team of anesthesiologists, otolaryngologists, trauma surgeons, emergency medicine physicians, and risk managers in 2005 at The Johns Hopkins Hospital in Baltimore, Maryland. The DART program had 3 core components: operations, safety, and education. The operations component focused on developing a multidisciplinary difficult airway response team, standardizing the emergency response process, and deploying difficult airway equipment carts throughout the hospital. The safety component focused on real-time monitoring of DART activations and learning from past DART events to continuously improve system-level performance. This objective entailed monitoring the paging system, reporting difficult airway events and DART activations to a Web-based registry, and using in situ simulations to identify and mitigate defects in the emergency airway management process. The educational component included development of a multispecialty difficult airway curriculum encompassing case-based lectures, simulation, and team building/communication to ensure consistency of care. Educational materials were also developed for non-DART staff and patients to inform them about the needs of patients with difficult airways and ensure continuity of care with other providers after discharge. Between July 2008 and June 2013, DART managed 360 adult difficult airway events comprising 8% of all code activations. Predisposing patient factors included body mass index >40, history of head and neck tumor, prior difficult intubation, cervical spine injury, airway edema, airway bleeding, and previous or current tracheostomy. Twenty-three patients (6%) required emergent surgical airways. Sixty-two patients (17%) were stabilized and transported to the operating room for definitive airway management. There were no airway management-related deaths, sentinel events, or malpractice claims in adult patients managed by DART. Five in situ simulations conducted in the first program year improved DART's teamwork, communication, and response times and increased the functionality of the difficult airway carts. Over the 5-year period, we conducted 18 airway courses, through which >200 providers were trained. DART is a comprehensive program for improving difficult airway management. Future studies will examine the comparative effectiveness of the DART program and evaluate how DART has impacted patient outcomes, operational efficiency, and costs of care.
Mark, Lynette J.; Herzer, Kurt R.; Cover, Renee; Pandian, Vinciya; Bhatti, Nasir I.; Berkow, Lauren C.; Haut, Elliott R.; Hillel, Alexander T.; Miller, Christina R.; Feller-Kopman, David J.; Schiavi, Adam J.; Xie, Yanjun J.; Lim, Christine; Holzmueller, Christine; Ahmad, Mueen; Thomas, Pradeep; Flint, Paul W.; Mirski, Marek A.
2015-01-01
Background Difficult airway cases can quickly become emergencies, increasing the risk of life-threatening complications or death. Emergency airway management outside the operating room is particularly challenging. Methods We developed a quality improvement program—the Difficult Airway Response Team (DART)—to improve emergency airway management outside the operating room. DART was implemented by a team of anesthesiologists, otolaryngologists, trauma surgeons, emergency medicine physicians, and risk managers in 2005 at The Johns Hopkins Hospital in Baltimore, Maryland. The DART program had three core components: operations, safety, and education. The operations component focused on developing a multidisciplinary difficult airway response team, standardizing the emergency response process, and deploying difficult airway equipment carts throughout the hospital. The safety component focused on real-time monitoring of DART activations and learning from past DART events to continuously improve system-level performance. This objective entailed monitoring the paging system, reporting difficult airway events and DART activations to a web-based registry, and using in situ simulations to identify and mitigate defects in the emergency airway management process. The educational component included development of a multispecialty difficult airway curriculum encompassing case-based lectures, simulation, and team building/communication to ensure consistency of care. Educational materials were also developed for non-DART staff and patients to inform them about the needs of patients with difficult airways and ensure continuity of care with other providers after discharge. Results Between July 2008 and June 2013, DART managed 360 adult difficult airway events comprising 8% of all code activations. Predisposing patient factors included body mass index > 40, history of head and neck tumor, prior difficult intubation, cervical spine injury, airway edema, airway bleeding, and previous or current tracheostomy. Twenty-three patients (6%) required emergent surgical airways. Sixty-two patients (17%) were stabilized and transported to the operating room for definitive airway management. There were no airway management-related deaths, sentinel events, or malpractice claims in adult patients managed by DART. Five in situ simulations conducted in the first program year improved DART's teamwork, communication, and response times and increased the functionality of the difficult airway carts. Over the 5-year period, we conducted 18 airway courses, through which more than 200 providers were trained. Conclusions DART is a comprehensive program for improving difficult airway management. Future studies will examine the comparative effectiveness of the DART program and evaluate how DART has impacted patient outcomes, operational efficiency, and costs of care. PMID:26086513
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-13
... lift to ensure that the wheel brakes can provide the necessary speed reduction. * * * * * The effects... brakes can provide the necessary speed reduction. A review of the changing operational profile of the... landing to provide aerodynamic braking and to dump lift to ensure that the wheel brakes can provide the...
Code of Federal Regulations, 2011 CFR
2011-07-01
... DEEPWATER PORTS: OPERATIONS Workplace Safety and Health Personal Protective Equipment § 150.608 Who is...) Each deepwater port operator must ensure that all personnel wear personal protective equipment when... that the personnel use or wear protective equipment and are trained in its use? 150.608 Section 150.608...
Code of Federal Regulations, 2010 CFR
2010-07-01
... DEEPWATER PORTS: OPERATIONS Workplace Safety and Health Personal Protective Equipment § 150.608 Who is...) Each deepwater port operator must ensure that all personnel wear personal protective equipment when... that the personnel use or wear protective equipment and are trained in its use? 150.608 Section 150.608...
The purpose of this SOP is to ensure suitable temperature maintenance of freezers used for storage of samples. This procedure was followed to ensure consistent data retrieval during the Arizona NHEXAS project and the "Border" study. Keywords: freezers; operation.
The National H...
Adherence to balance tolerance limits at the Upper Mississippi Science Center, La Crosse, Wisconsin.
Myers, C.T.; Kennedy, D.M.
1998-01-01
Verification of balance accuracy entails applying a series of standard masses to a balance prior to use and recording the measured values. The recorded values for each standard should have lower and upper weight limits or tolerances that are accepted as verification of balance accuracy under normal operating conditions. Balance logbooks for seven analytical balances at the Upper Mississippi Science Center were checked over a 3.5-year period to determine if the recorded weights were within the established tolerance limits. A total of 9435 measurements were checked. There were 14 instances in which the balance malfunctioned and operators recorded a rationale in the balance logbook. Sixty-three recording errors were found. Twenty-eight operators were responsible for two types of recording errors: Measurements of weights were recorded outside of the tolerance limit but not acknowledged as an error by the operator (n = 40); and measurements were recorded with the wrong number of decimal places (n = 23). The adherence rate for following tolerance limits was 99.3%. To ensure the continued adherence to tolerance limits, the quality-assurance unit revised standard operating procedures to require more frequent review of balance logbooks.
Vapor-Compression Heat Pumps for Operation Aboard Spacecraft
NASA Technical Reports Server (NTRS)
Ruemmele, Warren; Ungar, Eugene; Cornwell, John
2006-01-01
Vapor-compression heat pumps (including both refrigerators and heat pumps) of a proposed type would be capable of operating in microgravity and would be safe to use in enclosed environments like those of spacecraft. The designs of these pumps would incorporate modifications of, and additions to, vapor-compression cycles of heat pumps now used in normal Earth gravitation, in order to ensure efficiency and reliability during all phases of operation, including startup, shutdown, nominal continuous operation, and peak operation. Features of such a design might include any or all of the following: (1) Configuring the compressor, condenser, evaporator, valves, capillary tubes (if any), and controls to function in microgravitation; (2) Selection of a working fluid that satisfies thermodynamic requirements and is safe to use in a closed crew compartment; (3) Incorporation of a solenoid valve and/or a check valve to prevent influx of liquid to the compressor upon startup (such influx could damage the compressor); (4) Use of a diode heat pipe between the cold volume and the evaporator to limit the influx of liquid to the compressor upon startup; and (5) Use of a heated block to vaporize any liquid that arrives at the compressor inlet.
Water security - Nation state and international security implications
Tindall, James A.; Andrew A. Campbell,
2009-01-01
A terrorist attack such as poisoning and sabotage of the national water supply and water-quality infrastructure of the continental United States or any country, could disrupt the delivery of vital human services, threaten both public health and the environment, potentially cause mass casualties and pose grave public concern for homeland security. Most significantly, an attack on water resources would weaken social cohesion and trust in government. A threat to continuity of services is a potential threat to continuity of government since both are necessary for continuity of operations. Water infrastructure is difficult to protect, as it extends over vast areas across the U.S. and for which ownership is overwhelmingly nonfederal (approximately 85 percent). Since the 9111 attacks, federal dam operators and water and wastewater utilities have established counter measures. Similar measures have been taken in countries around the world. These include enhanced physical security, improved coordination between corporate ownership, Department of Homeland Security, and local law enforcement, and research into risk assessment and vulnerability analysis to ensure greater system safety. A key issue is the proportionate additional resources directed at public and private sector specific priorities. Agencies that have the scientific and technological ability to leverage resources, exploit integrated science approaches, focus on interdisciplinary practices, utilize informatics expertise and employ a wide use of evolving technologies should play a key role in water security and related issues.
Source technology as the foundation for modern infra-red counter measures (IRCM)
NASA Astrophysics Data System (ADS)
Grasso, Robert J.
2010-10-01
Protection of military aircraft from IR guided threats is paramount to ensure the survivability of aircrews, platforms, and to ensure mission success. At the foundation of all IRCM systems is the source; that component that provides the in-band radiant energy required for threat defeat. As such, source technology has evolved with IRCM technology to encompass the evolving systems architectures that encompass IRCM: 1) "Hot Brick" omni-directional sources; 2) arc lamps, and; 3) lasers. Lasers, as IRCM sources continue to evolve to meet the challenges of ever-evolving threats, superior techniques, economy of installation, and superior source technology. Lasers represent the single greatest advance in IRCM source technology and continue to evolve to meet ever more sophisticated threats. And have been used with great effect in all modern IRCM systems; evolving from frequency doubled CO2 lasers, to solid state lasers with OPOs, to semiconductor lasers including Quantum Cascade Lasers (QCLs); these last devices represent the latest advance in IRCM source technology offering all-band coverage, architectural simplicity, and economy of scale. While QCLs represent the latest advance in IRCM laser technology, fiber lasers show much promise in addressing multi-band operation as well as the ability to be coherently combined to achieve even greater output capability. Also, ultra-short pulse lasers are evolving to become practical for IRCM applications. Stay tuned ......
Maurizi, Anna R; Suraci, Concetta; Pitocco, Dario; Schiaffini, Riccardo; Tubili, Claudio; Morviducci, Lelio; Giordano, Renato; Manfrini, Silvia; Lauro, Davide; Frontoni, Simona; Pozzilli, Paolo; Buzzetti, Raffaella
2016-01-01
This document has been developed by a group of Italian diabetologists with extensive experience in continuous subcutaneous insulin infusion (CSII) therapy to provide indications for the clinical management of CSII in diabetic patients (both type 1 and type 2) based on delivery mode operating in Italy. Although the potential benefits of pump therapy in achieving glycemic goals is now accepted, such results cannot be obtained without specific knowledge and skills being conveyed to patients during ad hoc educational training. To ensure that these new technologies reach their full effectiveness, as demonstrated theoretically and clinically, a careful assessment of the overall therapeutic and educational process is required, in both qualitative and quantitative terms. Therefore, to ensure the cost-effectiveness of insulin pump therapy and to justify reimbursement of therapy costs by the National Health System in Italy, in this article we present a model for diabetes and healthcare centers to follow that provides for different levels of expertise in the field of CSII therapy. This model will guarantee the provision of excellent care during insulin pump therapies, thus representing the basis for a successful outcome and expansion of this form of insulin treatment in patients with diabetes while also keeping costs under control. © 2015 Ruijin Hospital, Shanghai Jiaotong University School of Medicine and Wiley Publishing Asia Pty Ltd.
An IMS Station life cycle from a sustainment point of view
NASA Astrophysics Data System (ADS)
Brely, Natalie; Gautier, Jean-Pierre; Foster, Daniel
2014-05-01
The International Monitoring System (IMS) is to consist of 321 monitoring facilities, composed of four different technologies with a variety of designs and equipment types, deployed in a range of environments around the globe. The International Monitoring System is conceived to operate in perpetuity through maintenance, replacement and recapitalization of IMS facilities' infrastructure and equipment when the end of service life is reached [CTBT/PTS/INF.1163]. Life Cycle techniques and modellization are being used by the PTS to plan and forecast life cycle sustainment requirements of IMS facilities. Through historical data analysis, Engineering inputs and Feedback from experienced Station Operators, the PTS currently works towards increasing the level of confidence on these forecasts and sustainment requirements planning. Continued validation, feedback and improvement of source data from scientific community and experienced users is sought and essential in order to ensure limited effect on data availability and optimal costs (human and financial).
Crew Exploration Vehicle Ascent Abort Overview
NASA Technical Reports Server (NTRS)
Davidson, John B., Jr.; Madsen, Jennifer M.; Proud, Ryan W.; Merritt, Deborah S.; Sparks, Dean W., Jr.; Kenyon, Paul R.; Burt, Richard; McFarland, Mike
2007-01-01
One of the primary design drivers for NASA's Crew Exploration Vehicle (CEV) is to ensure crew safety. Aborts during the critical ascent flight phase require the design and operation of CEV systems to escape from the Crew Launch Vehicle and return the crew safely to the Earth. To accomplish this requirement of continuous abort coverage, CEV ascent abort modes are being designed and analyzed to accommodate the velocity, altitude, atmospheric, and vehicle configuration changes that occur during ascent. The analysis involves an evaluation of the feasibility and survivability of each abort mode and an assessment of the abort mode coverage. These studies and design trades are being conducted so that more informed decisions can be made regarding the vehicle abort requirements, design, and operation. This paper presents an overview of the CEV, driving requirements for abort scenarios, and an overview of current ascent abort modes. Example analysis results are then discussed. Finally, future areas for abort analysis are addressed.
Quantifying the Impact of Unavailability in Cyber-Physical Environments
DOE Office of Scientific and Technical Information (OSTI.GOV)
Aissa, Anis Ben; Abercrombie, Robert K; Sheldon, Federick T.
2014-01-01
The Supervisory Control and Data Acquisition (SCADA) system discussed in this work manages a distributed control network for the Tunisian Electric & Gas Utility. The network is dispersed over a large geographic area that monitors and controls the flow of electricity/gas from both remote and centralized locations. The availability of the SCADA system in this context is critical to ensuring the uninterrupted delivery of energy, including safety, security, continuity of operations and revenue. Such SCADA systems are the backbone of national critical cyber-physical infrastructures. Herein, we propose adapting the Mean Failure Cost (MFC) metric for quantifying the cost of unavailability.more » This new metric combines the classic availability formulation with MFC. The resulting metric, so-called Econometric Availability (EA), offers a computational basis to evaluate a system in terms of the gain/loss ($/hour of operation) that affects each stakeholder due to unavailability.« less
Should the United States Continue to Provide Aid to Africa?
2012-03-22
this choice.75 History has shown that no amount of foreign aid can lead Africa to a meaningful developmental process without effective governance...aid and what approaches need to be taken into account to ensure it remains an effective ‘strategic investment.” 15. SUBJECT TERMS Foreign Policy...account to ensure it remains an effective ‘strategic investment.” SHOULD THE UNITED STATES CONTINUE TO PROVIDE AID TO AFRICA? The
Feasibility of Construction of the Continuously Operating Geodetic GPS Network of Sinaloa, Mexico
NASA Astrophysics Data System (ADS)
Vazquez, G. E.; Jacobo, C.
2011-12-01
This research is based on the study and analysis of feasibility for the construction of the geodetic network for GPS continuous operation for Sinaloa, hereafter called (RGOCSIN). A GPS network of continuous operation is defined as that materialized structure physically through permanent monuments where measurements to the systems of Global Positioning (GPS) is performed continuously throughout a region. The GPS measurements in this network are measurements of accuracy according to international standards to define its coordinates, thus constituting the basic structure of geodetic referencing for a country. In this context is that in the near future the RGOCSIN constitutes a system state only accurate and reliable georeferencing in real-time (continuous and permanent operation) and will be used for different purposes; i.e., in addition to being fundamental basis for any lifting topographic or geodetic survey, and other areas such as: (1) Different construction processes (control and monitoring of engineering works); (2) Studies of deformation of the Earth's crust (before and after a seismic event); (3) GPS meteorology (weather forecasting); (4) Demarcation projects (natural and political); (5) Establishment of bases to generate mapping (necessary for the economic and social development of the state); (6) Precision agriculture (optimization of economic resources to the various crops); (7) Geographic information systems (Organization and planning activities associated with the design and construction of public services); (8) Urban growth (possible settlements in the appropriate form and taking care of the environmental aspect), among others. However there are criteria and regulations according to the INEGI (Instituto Nacional de Estadística y Geografía, http://www.inegi.org.mx/) that must be met; even for this stage of feasibility of construction that sees this project as a first phase. The fundamental criterion to be taken into account according to INEGI is a geometric distribution appropriate to ensure the state coverage, so the radius of coverage is found in the 10 to 15 Km. station. Likewise INEGI recommends the implementation of GPS measurements a priori in the vertices where at the end of such measurements generate a report by station containing details of the conditions of visibility, the GPS equipment used, the methodology of measurement and field data processing mode and is intended to build the RGOCSIN. Based on the results of the final report for each one of the measures beforehand, it will be or not feasible to determine if it meets these specifications to be finally considered as part of the RGOCSIN. It should be noted that the selection of the potential places where is intended to carry out the study and analysis of feasibility for the construction of the RGOCSIN will be some of the weather stations of the Centro de Investigación en Alimentación y Desarrollo (CIAD) Culiacán (http://www.ciad.edu.mx/clima/pc.asp). These weather stations have some technical infrastructure which would be used in the future; In addition to providing meteorological information which will ensure success in the solution of scientific and technological problems in various sectors requiring our state.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-30
... aerodynamic braking and to dump lift to ensure that the wheel brakes can provide the necessary speed reduction... the wheel brakes can provide the necessary speed reduction. A review of the changing operational... on landing to provide aerodynamic braking and to dump lift to ensure that the wheel brakes can...
40 CFR 60.36e - Inspection guidelines.
Code of Federal Regulations, 2014 CFR
2014-07-01
... bypass stack components; (xvi) Ensure proper calibration of thermocouples, sorbent feed systems and any...) for proper operation, if applicable; (ii) Ensure proper calibration of thermocouples, sorbent feed...
40 CFR 60.36e - Inspection guidelines.
Code of Federal Regulations, 2013 CFR
2013-07-01
... bypass stack components; (xvi) Ensure proper calibration of thermocouples, sorbent feed systems and any...) for proper operation, if applicable; (ii) Ensure proper calibration of thermocouples, sorbent feed...
40 CFR 60.36e - Inspection guidelines.
Code of Federal Regulations, 2012 CFR
2012-07-01
... bypass stack components; (xvi) Ensure proper calibration of thermocouples, sorbent feed systems and any...) for proper operation, if applicable; (ii) Ensure proper calibration of thermocouples, sorbent feed...
Scheltema, Richard A; Mann, Matthias
2012-06-01
With the advent of high-throughput mass spectrometry (MS)-based proteomics, the magnitude and complexity of the performed experiments has increased dramatically. Likewise, investments in chromatographic and MS instrumentation are a large proportion of the budget of proteomics laboratories. Guarding measurement quality and maximizing uptime of the LC-MS/MS systems therefore requires constant care despite automated workflows. We describe a real-time surveillance system, called SprayQc, that continuously monitors the status of the peripheral equipment to ensure that operational parameters are within an acceptable range. SprayQc is composed of multiple plug-in software components that use computer vision to analyze electrospray conditions, monitor the chromatographic device for stable backpressure, interact with a column oven to control pressure by temperature, and ensure that the mass spectrometer is still acquiring data. Action is taken when a failure condition has been detected, such as stopping the column oven and the LC flow, as well as automatically notifying the appropriate operator. Additionally, all defined metrics can be recorded synchronized on retention time with the MS acquisition file, allowing for later inspection and providing valuable information for optimization. SprayQc has been extensively tested in our laboratory, supports third-party plug-in development, and is freely available for download from http://sourceforge.org/projects/sprayqc .
The Establishment of a Formal Midwest Renewable Energy Tracking System (M-RETS) Organization
DOE Office of Scientific and Technical Information (OSTI.GOV)
Maria Redmond; Chela Bordas O'Connor
2010-06-30
The objectives identified in requesting and utilizing this funding has been met. The goal was to establish a formal, multi-jurisdictional organization to: (1) ensure the policy objectives of the participating jurisdictions are addressed through increased tradability of the Renewable Energy Credits (RECs) from M-RETS and to eliminate the possibility that a single jurisdiction will be the sole arbiter of the operation of the system; (2) facilitate the establishment of REC standards including the attributes related to, the creation, trading, and interaction with other trading and tracking systems; and (3) have a centralized and established organization that will be responsible formore » the contracting and governance responsibilities of a multi-jurisdictional tracking system. The M-RETS Inc. Board ensures that the system remains policy neutral; that the attributes of generation are tracked in a way that allows the system users to easily identify and trade relevant RECs; that the system can add jurisdictions as needed or desired; and that the tracking system operate in such a way to allow for the greatest access possible for those participating in other tracking or trading systems by allowing those systems to negotiate with a single M-RETS entity for the import and export of RECs. M-RETS as an organizational body participates and often leads the discussions related to the standardization of RECs and increasing the tradability of M-RETS RECs. M-RETS is a founding member of the Environmental Trading Network of North America (ETNNA) and continues to take a leadership role in the development of processes to facilitate trading among tracking systems and to standardize REC definitions. The Board of Directors of M-RETS, Inc., the non-profit corporation, continues to hold telephone/internet Board meetings. Legal counsel continues working with the board and APX management on a new agreement with APX. The board expects to have an agreement and corresponding fee structure in place by January 2011. The Board has recently approved exports to three other tracking systems and is in discussions about imports to the system. Below are the tasks outlined in the request and attached you will find the relevant documentation.« less
Free Flyer Total and Spectral Solar Irradiance Sensor (TSIS) and Climate Services Mission
NASA Technical Reports Server (NTRS)
Cahalan, R.; Pilewskie, P.; Woods, T.
2012-01-01
NOAA's planned Total and Spectral Solar Irradiance Sensor (TSIS) mission will fly along with the NOAA user service payloads Advanced Data Collection System (ADCS) and Search and Rescue Satellite Aided Tracking (SARSAT). In ' order to guarantee continuity in the 33-year solar irradiance climate data record, TSIS must be launched in time to overlap with current on-orbit solar irradiance instruments. Currently TSIS is moving towards a launch rcadinss date of January 2015. TSIS provides for continuation of the Total Irradiance Monitor (TIM) and the Spectral Irradiance Monitor (SIM) ,currently onboard NASA's Solar Radiation and Climate Experiment (SORCE) platform, launched in January 2003. The difficulty of ensuring continuity has increased due to the launch failure of NASA's Glory mission with its improved TIM. Achieving the needed overlap must now rely on extending SORCE. and maintaining the TSIS schedule. TSIS is one component of a NASA-NOAA joint program (JPSS) planned to transition certain climate observations to operational mode. We summarize issues of continuity, improvements being made to the TIM and 81M sensors, and plans to provide for traceability of total and spectral irradiance measurements to ground-based cryogenic standards.
Real-Time Operation of the International Space Station
NASA Astrophysics Data System (ADS)
Suffredini, M. T.
2002-01-01
The International Space Station is on orbit and real-time operations are well underway. Along with the assembly challenges of building and operating the International Space Station , scientific activities are also underway. Flight control teams in three countries are working together as a team to plan, coordinate and command the systems on the International Space Station.Preparations are being made to add the additional International Partner elements including their operations teams and facilities. By October 2002, six Expedition crews will have lived on the International Space Station. Management of real-time operations has been key to these achievements. This includes the activities of ground teams in control centers around the world as well as the crew on orbit. Real-time planning is constantly challenged with balancing the requirements and setting the priorities for the assembly, maintenance, science and crew health functions on the International Space Station. It requires integrating the Shuttle, Soyuz and Progress requirements with the Station. It is also necessary to be able to respond in case of on-orbit anomalies and to set plans and commands in place to ensure the continues safe operation of the Station. Bringing together the International Partner operations teams has been challenging and intensely rewarding. Utilization of the assets of each partner has resulted in efficient solutions to problems. This paper will describe the management of the major real-time operations processes, significant achievements, and future challenges.
Landsat: building a strong future
Loveland, Thomas R.; Dwyer, John L.
2012-01-01
Conceived in the 1960s, the Landsat program has experienced six successful missions that have contributed to an unprecedented 39-year record of Earth Observations that capture global land conditions and dynamics. Incremental improvements in imaging capabilities continue to improve the quality of Landsat science data, while ensuring continuity over the full instrument record. Landsats 5 and 7 are still collecting imagery. The planned launch of the Landsat Data Continuity Mission in December 2012 potentially extends the Landsat record to nearly 50 years. The U.S. Geological Survey (USGS) Landsat archive contains nearly three million Landsat images. All USGS Landsat data are available at no cost via the Internet. The USGS is committed to improving the content of the historical Landsat archive though the consolidation of Landsat data held in international archives. In addition, the USGS is working on a strategy to develop higher-level Landsat geo- and biophysical datasets. Finally, Federal efforts are underway to transition Landsat into a sustained operational program within the Department of the Interior and to authorize the development of the next two satellites — Landsats 9 and 10.
Fitting C 2 Continuous Parametric Surfaces to Frontiers Delimiting Physiologic Structures
Bayer, Jason D.
2014-01-01
We present a technique to fit C 2 continuous parametric surfaces to scattered geometric data points forming frontiers delimiting physiologic structures in segmented images. Such mathematical representation is interesting because it facilitates a large number of operations in modeling. While the fitting of C 2 continuous parametric curves to scattered geometric data points is quite trivial, the fitting of C 2 continuous parametric surfaces is not. The difficulty comes from the fact that each scattered data point should be assigned a unique parametric coordinate, and the fit is quite sensitive to their distribution on the parametric plane. We present a new approach where a polygonal (quadrilateral or triangular) surface is extracted from the segmented image. This surface is subsequently projected onto a parametric plane in a manner to ensure a one-to-one mapping. The resulting polygonal mesh is then regularized for area and edge length. Finally, from this point, surface fitting is relatively trivial. The novelty of our approach lies in the regularization of the polygonal mesh. Process performance is assessed with the reconstruction of a geometric model of mouse heart ventricles from a computerized tomography scan. Our results show an excellent reproduction of the geometric data with surfaces that are C 2 continuous. PMID:24782911
British Policy Towards Loyalists in the Philadelphia Campaign, 1777-1778
2017-05-25
revolution. This lack of nuanced understanding prevented the formation of a coherent policy at the operational level to ensure the support of the...lack of nuanced understanding prevented the formation of a coherent policy at the operational level to ensure the support of the Loyalists...of using devious math to justify the lack of reinforcements by including the sick and captured in his count.9
Near-infrared light-controlled tunable grating based on graphene/elastomer composites
NASA Astrophysics Data System (ADS)
Wang, Fei; Jia, Shuhai; Wang, Yonglin; Tang, Zhenhua
2018-02-01
A near-infrared (nIR) light actuated tunable transmission optical grating based on graphene nanoplatelet (GNP)/polydimethylsiloxane (PDMS) and PDMS is proposed. A simple fabrication protocol is studied that allows integration of the grating with the actuation mechanism; both components are made from soft elastomers, and this ensure the tunability and the light-driven operation of the grating. The resulting grating structure demonstrates continuous period tunability of 2.7% under an actuation power density of 220 mW cm-2 within a period of 3 s and also demonstrates a time-independent characteristic. The proposed infrared activated grating can be developed for wireless remote light splitting in bio/chemical sensing and optical telecommunications applications.
Automation for Crushing and Screening Equipment to Produce Graded Paving Crushed Stone
NASA Astrophysics Data System (ADS)
Tikhonov, Anatoly; Velichkin, Vladimir
2017-10-01
This paper offers analysis of factors related to production and storage of graded crushed stone, which adversely impact the service life and wear resistance of asphalt-concrete motor road pavements. The paper describes external and technology-related parameters that may cause changes of the preset ratio in graded crushed stone. Control factors are described that ensure the formulated fraction ratio in crushed stone by controlling the operation mode of the crushing and screening equipment. The paper also contains an ACS flow chart for crushing and screening equipment engaged in continuous closed-cycle two-stage technology. Performance of the ACS to maintain the preset fractionated crushed stone ratio has been confirmed with a mathematical model.
NASA Astrophysics Data System (ADS)
Baryshev, V. I.; Golikova, E. G.; Duraev, V. P.; Kuchinskiĭ, V. I.; Kizhaev, K. Yu; Kuksenkov, D. V.; Portnoĭ, E. L.; Smirnitskiĭ, V. B.
1988-11-01
A study was made of stimulated emission from mesa-stripe distributed-feedback lasers in the form of double heterostructures with separate electron and optical confinement. A diffraction grating with a period Λ = 0.46 μm, formed on the surface of the upper waveguide layer by holographic lithography, ensured distributed feedback in the second order. The threshold current for cw operation at room temperature was 35-70 mA, the shift of the emission wavelength with temperature was ~ 0.08 nm/K, and the feedback coefficient deduced from the width of a "Bragg gap" was 110-150 cm- 1.
NASA Technical Reports Server (NTRS)
Palo, Thomas E.
2007-01-01
The safety review process for NASA spacecraft flown on Expendable Launch Vehicles (ELVs) has been guided by NASA-STD 8719.8, Expendable Launch Vehicle Payload Safety Review Process Standard. The standard focused primarily on the safety approval required to begin pre-launch processing at the launch site. Subsequent changes in the contractual, technical, and operational aspects of payload processing, combined with lessons-learned supported a need for the reassessment of the standard. This has resulted in the formation of a NASA ELV Payload Safety Program. This program has been working to address the programmatic issues that will enhance and supplement the existing process, while continuing to ensure the safety of ELV payload activities.
Combining Simulation Tools for End-to-End Trajectory Optimization
NASA Technical Reports Server (NTRS)
Whitley, Ryan; Gutkowski, Jeffrey; Craig, Scott; Dawn, Tim; Williams, Jacobs; Stein, William B.; Litton, Daniel; Lugo, Rafael; Qu, Min
2015-01-01
Trajectory simulations with advanced optimization algorithms are invaluable tools in the process of designing spacecraft. Due to the need for complex models, simulations are often highly tailored to the needs of the particular program or mission. NASA's Orion and SLS programs are no exception. While independent analyses are valuable to assess individual spacecraft capabilities, a complete end-to-end trajectory from launch to splashdown maximizes potential performance and ensures a continuous solution. In order to obtain end-to-end capability, Orion's in-space tool (Copernicus) was made to interface directly with the SLS's ascent tool (POST2) and a new tool to optimize the full problem by operating both simulations simultaneously was born.
Hydroelectric power from ocean waves
NASA Astrophysics Data System (ADS)
Raghavendran, K.
1981-02-01
This paper describes a system which converts the variable energy of ocean waves into a steady supply of energy in a conventional form. The system consists of a set of floats and Persian wheels located off-shore and a storage reservoir on the shore. The floats oscillate vertically as the waves pass below them and turn their respective Persian wheels which lift sea water to a height and deliver to the reservoir through an interconnecting pipeline. The head of water in the reservoir operates a hydraulic turbine which in turn works a generator to supply electricity. Due to the recurrent wave action, water is maintained at the optimum level in the reservoir to ensure continuous power supply.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-28
... (Operation Enduring Freedom/ Operation Iraqi Freedom Seriously Injured/Ill Service Member Veteran Worksheet... No. 2900-0720.'' SUPPLEMENTARY INFORMATION: Title: Operation Enduring Freedom/Operation Iraqi Freedom... used VA Form 21-0773 as a checklist to ensure they provided Operation Enduring Freedom or Operation...
Incident Management in Academic Information System using ITIL Framework
NASA Astrophysics Data System (ADS)
Palilingan, V. R.; Batmetan, J. R.
2018-02-01
Incident management is very important in order to ensure the continuity of a system. Information systems require incident management to ensure information systems can provide maximum service according to the service provided. Many of the problems that arise in academic information systems come from incidents that are not properly handled. The objective of this study aims to find the appropriate way of incident management. The incident can be managed so it will not be a big problem. This research uses the ITIL framework to solve incident problems. The technique used in this study is a technique adopted and developed from the service operations section of the ITIL framework. The results of this research found that 84.5% of incidents appearing in academic information systems can be handled quickly and appropriately. 15.5% incidents can be escalated so as to not cause any new problems. The model of incident management applied to make academic information system can run quickly in providing academic service in a good and efficient. The incident management model implemented in this research is able to manage resources appropriately so as to quickly and easily manage incidents.
FAA bulk technology overview for explosives detection
NASA Astrophysics Data System (ADS)
Novakoff, Alan K.
1993-04-01
The Federal Aviation Administration (FAA) is the leading federal agency responsible for encouraging and fostering the development of a safe, secure, and efficient national airspace system (NAS). Our goal is to establish an operating environment that ensures a threat-free system to preclude acts of terrorism and fatalities. As part of the process to meet this goal, our research and development activities continually search for technologies to ensure aviation security. Recent acts of terrorism against the aviation community have demonstrated an increasing level of sophistication in the design and deployment of explosive devices. In order to prevent the introduction of explosives onto an aircraft they must be detected prior to passenger and baggage loading. The Bulk Detection program is one method of developing a number of technologies that 'see' into and 'alarm' on suspect baggage. These detection devices must be capable of providing this serve with a confidence commensurate with the state-of-the- art available today. This program utilizes the expertise of government agencies, universities and industries working toward constructing their plans and executing their designs to produce the best available equipment.
Transitioning GONG data processing to NOAA SWPC operations
NASA Astrophysics Data System (ADS)
Reinard, A.; Marble, A.; Hill, F.; Berger, T. E.
2015-12-01
The NOAA Space Weather Prediction Center (SWPC) is the nation's official source of space weather watches, warnings, and alerts, providing 24x7 forecasting and support to critical infrastructure operators around the world. Observations of the conditions on the Sun are crucial for determining when and if a warning is needed. The Global Oscillation Network Group (GONG) operated by the National Solar Observatory (NSO) consists of six ground stations, allowing continuous observations of the Sun. Of particular interest for space weather purposes are the H-alpha images and magnetograms. The H-alpha data are used to identify filaments and their eruptions, to assess active region evolution and plage extent, and to help localize flare locations. The magnetograms are used to identify neutral lines, to examine potential shearing areas and to characterize the magnetic structure of active regions. GONG magnetograms also provide the initial condition for models of solar wind expansion through the heliosphere such as the WSA-Enlil model. Although beyond the scope of current space weather applications, GONG helioseismology products can be used to assess active region emergence on the far side of the Sun and to indicate the flaring potential of a front-side active region. These products are being examined as future tools in flare prediction. NSO has operated GONG as a science facility since 1995 and has provided processed space weather data products to NOAA via public internet connections for the past several years. In 2014 the White House Office of Management and Budget (OMB) requested that NOAA transition the GONG network to an operational space weather asset in order to ensure the continued flow of critical magnetogram data for solar wind models. NSO will continue to operate and manage the instruments and sites, but the H-alpha images and 10 minute averaged magnetogram data will be sent directly to SWPC for processing and use in space weather modeling. SWPC will make these data available to NSO and the public via the new NOAA Integrated Dissemination Program (IDP) network. We discuss the progress and details of this change.
Transitioning GONG data processing to NOAA SWPC operations
NASA Astrophysics Data System (ADS)
Reinard, Alysha; Marble, Andrew R.; Berger, Thomas
2016-05-01
The NOAA Space Weather Prediction Center (SWPC) is the nation's official source of space weather watches, warnings, and alerts, providing 24x7 forecasting and support to critical infrastructure operators around the world. Observations of the conditions on the Sun are crucial for determining when and if a warning is needed. The Global Oscillation Network Group (GONG) operated by the National Solar Observatory (NSO) consists of six ground stations, allowing continuous observations of the Sun. Of particular interest for space weather purposes are the H-alpha images and magnetograms. The H-alpha data are used to identify filaments and their eruptions, to assess active region evolution and plage extent, and to help localize flare locations. The magnetograms are used to identify neutral lines, to examine potential shearing areas and to characterize the magnetic structure of active regions. GONG magnetograms also provide the initial condition for models of solar wind expansion through the heliosphere such as the WSA-Enlil model. Although beyond the scope of current space weather applications, GONG helioseismology products can be used to assess active region emergence on the far side of the Sun and to indicate the flaring potential of a front-side active region. These products are being examined as future tools in flare prediction.NSO has operated GONG as a science facility since 1995 and has provided processed space weather data products to NOAA via for the past several years. In 2014 the White House Office of Management and Budget (OMB) requested that NOAA transition the GONG network to an operational space weather asset in order to ensure the continued flow of critical data for solar wind models. NSO will continue to operate and manage the instruments and sites, but the H-alpha images and 10 minute averaged magnetogram data will be sent directly to SWPC for processing and use in space weather modeling. SWPC will make these data available to NSO and the public via the new NOAA Integrated Dissemination Program (IDP) network. We discuss the progress and details of this change.
Methods for maintaining the continuity of power supply in hospitals
NASA Astrophysics Data System (ADS)
Mihut, V. V.; Panoiu, M.; Panoiu, C.; Baciu, I.
2018-01-01
This paper presents alternative solutions to ensure power supply of critical consumer, such hospitals. In a hospital it is extremely important to have a power supply without any interruption. This is the reason of the using various solutions that ensure continuity of power supply. In this paper it is presented a solution used in a hospital in Romania. Here is used a generator controlled by microprocessor capable of taking over power supply in case there are problems with power supply from the national power grid.
The Urban melting pot: A recipe for sustainable living?
NASA Astrophysics Data System (ADS)
Terblanche, Deon
2015-04-01
Many of the milestones of human development can be traced back to people assembled in groups where economies of scale, competition and social interaction stimulated innovation. Considering that more than half the global pollution now lives in cities and towns and that most of the growth in the global pollution in the remainder of this century will continue to take place in the urban environment, the question could be asked whether humankind will continue to capitalize on the traditional benefits of city life to find solutions for growing environmental challenges? By ensuring that cities are planned and operated to make best use of the prevailing climate, resources and in a manner in which its inhabitants are safe from extreme weather and environmental events there is a good chance that cities will continue to contribute to solutions. However, if cities are allowed to developed in a haphazard manner with poorly managed infrastructure which expose citizens to the dangers of a changing climate and environmental degradation, the fight for survival will overshadow the entrepreneurial spirit. There is now a window of opportunity for weather, climate, water and environmental scientists to contribute towards a more sustainable urban future by ensuring that services based on these sciences from an integrated part of urban development and management. WMO recognizes that the rapid urbanization will require new types of services making best use of science and technology and considers this problem as one of the main priorities. Such Integrated Urban Weather, Environment and Climate Services should assist cities in facing hazards such as storm surge, flooding, heat waves, and air pollution episodes, especially in changing climates. The talk will highlight some of the opportunities that exist in this regard.
Flight Dynamics Performances of the MetOp A Satellite during the First Months of Operations
NASA Technical Reports Server (NTRS)
Righetti, Pier Luigi; Meixner, Hilda; Sancho, Francisco; Damiano, Antimo; Lazaro, David
2007-01-01
The 19th of October 2006 at 16:28 UTC the first MetOp satellite (MetOp A) was successfully launched from the Baykonur cosmodrome by a Soyuz/Fregat launcher. After only three days of LEOP operations, performed by ESOC, the satellite was handed over to EUMETSAT, who is since then taking care of all satellite operations. MetOp A is the first European operational satellite for meteorology flying in a Low Earth Orbit (LEO), all previous satellites operated by EUMETSAT, belonging to the METEOSAT family, being located in the Geo-stationary orbit. To ensure safe operations for a LEO satellite accurate and continuous commanding from ground of the on-board AOCS is required. That makes the operational transition at the end of the LEOP quite challenging, as the continuity of the Flight Dynamics operations is to be maintained. That means that the main functions of the Flight Dynamics have to be fully validated on-flight during the LEOP, before taking over the operational responsibility on the spacecraft, and continuously monitored during the entire mission. Due to the nature of a meteorological operational mission, very stringent requirements in terms of overall service availability (99 % of the collected data), timeliness of processing of the observation data (3 hours after sensing) and accuracy of the geo-location of the meteorological products (1 km) are to be fulfilled. That translates in tight requirements imposed to the Flight Dynamics facility (FDF) in terms of accuracy, timeliness and availability of the generated orbit and clock solutions; a detailed monitoring of the quality of these products is thus mandatory. Besides, being the accuracy of the image geo-location strongly related with the pointing performance of the platform and with the on-board timing stability, monitoring from ground of the behaviour of the on-board sensors and clock is needed. This paper presents an overview of the Flight Dynamics operations performed during the different phases of the MetOp A mission up to routine. The activities performed to validate all the Flight Dynamics functions, characterize the behaviour of the satellite and monitor the performances of the Flight Dynamics facility will be highlighted. The MetOp Flight Dynamics Operations team is led by Anders Meier Soerensen and composed by Pier Luigi Righetti, Francisco Sancho, Antimo Damiano and David Lazaro. The team is supported by Hilda Meixner, responsible for all Flight Dynamics validation activities.
EPA to Host June 21, 2018, Webinar on Strategy to Ensure Effectiveness of Hospital Disinfectants
EPA will host a listening session via webinar to seek stakeholders' input on the development of a risk-based product testing strategy to ensure continued effectiveness of hospital disinfectant products on June 21, 2018
NASA Technical Reports Server (NTRS)
Sheth, Kapil; Wang, Easter Mayan Chan
2016-01-01
Airspace Technology Demonstration #3 (ATD-3) is part of NASA's Airspace Operations and Safety Program (AOSP) - specifically, its Airspace Technology Demonstrations (ATD) Project. ATD-3 is a multiyear research and development effort which proposes to develop and demonstrate automation technologies and operating concepts that enable air navigation service providers and airspace users to continuously assess weather, winds, traffic, and other information to identify, evaluate, and implement workable opportunities for flight plan route corrections that can result in significant flight time and fuel savings in en route airspace. In order to ensure that the products of this tech-transfer are relevant and useful, NASA has created strong partnerships with the FAA and key industry stakeholders. This summary document and accompanying technology artifacts satisfy the first of three Research Transition Products (RTPs) defined in the Applied Traffic Flow Management (ATFM) Research Transition Team (RTT) Plan. This transfer consists of NASA's legacy Dynamic Weather Routes (DWR) work for efficient routing for en-route weather avoidance. DWR is a ground-based trajectory automation system that continuously and automatically analyzes active airborne aircraft in en route airspace to identify opportunities for simple corrections to flight plan routes that can save significant flying time, at least five minutes wind-corrected, while avoiding weather and considering traffic conflicts, airspace sector congestion, special use airspace, and FAA routing restrictions. The key benefit of the DWR concept is to let automation continuously and automatically analyze active flights to find those where simple route corrections can save significant time and fuel. Operators are busy during weather events. It is more effective to let automation find the opportunities for high-value route corrections.
An overview of safety assessment, regulation, and control of hazardous material use at NREL
NASA Astrophysics Data System (ADS)
Nelson, B. P.; Crandall, R. S.; Moskowitz, P. D.; Fthenakis, V. M.
1992-12-01
This paper summarizes the methodology we use to ensure the safe use of hazardous materials at the National Renewable Energy Laboratory (NREL). First, we analyze the processes and the materials used in those processes to identify the hazards presented. Then we study federal, state, and local regulations and apply the relevant requirements to our operations. When necessary, we generate internal safety documents to consolidate this information. We design research operations and support systems to conform to these requirements. Before we construct the systems, we perform a semiquantitative risk analysis on likely accident scenarios. All scenarios presenting an unacceptable risk require system or procedural modifications to reduce the risk. Following these modifications, we repeat the risk analysis to ensure that the respective accident scenarios present an acceptable risk. Once all risks are acceptable, we conduct an operational readiness review (ORR). A management-appointed panel performs the ORR ensuring compliance with all relevant requirements. After successful completion of the ORR, operations can begin.
NASA Astrophysics Data System (ADS)
Kibrick, Robert I.; Wirth, Gregory D.; Allen, Steven L.; Deich, William T. S.; Goodrich, Robert W.; Lanclos, Kyle; Lyke, James E.
2011-03-01
For over a decade, the W. M. Keck Observatory's two 10-meter telescopes have been operated remotely from its Waimea headquarters. Over the last 9 years, WMKO remote observing has expanded to allow observing teams at dedicated sites located across California to observe via the Internet either in collaboration with colleagues in Waimea or entirely from California; this capability was extended to Swinburne University in Melbourne, Australia in 2010 and to Yale University in New Haven, Connecticut in early 2011. All Keck facility science instruments are currently supported. Observers distributed between as many as four sites can collaborate in the interactive operation of each instrument by means of shared VNC desktops and multipoint video and/or telephone conferencing. Automated routers at primary remote observing sites ensure continued connectivity during Internet outages. Each Keck remote observing facility is similarly equipped and configured so observers have the same operating environment. This architecture provides observers the flexibility to conduct observations from the location best suited to their needs and to adapt to last-minute changes. It also enhances the ability of off-site technical staff to provide remote support.
JWST Wavefront Sensing and Control: Operations Plans, Demonstrations, and Status
NASA Astrophysics Data System (ADS)
Perrin, Marshall; Acton, D. Scott; Lajoie, Charles-Philippe; Knight, J. Scott; Myers, Carey; Stark, Chris; JWST Wavefront Sensing & Control Team
2018-01-01
After JWST launches and unfolds in space, its telescope optics will be aligned through a complex series of wavefront sensing and control (WFSC) steps to achieve diffraction-limited performance. This iterative process will comprise about half of the observatory commissioning time (~ 3 out of 6 months). We summarize the JWST WFSC process, schedule, and expectations for achieved performance, and discuss our team’s activities to prepare for an effective & efficient telescope commissioning. During the recently-completed OTIS cryo test at NASA JSC, WFSC demonstrations showed the flight-like operation of the entire JWST active optics and WFSC system from end to end, including all hardware and software components. In parallel, the same test data were processed through the JWST Mission Operations Center at STScI to demonstrate the readiness of ground system components there (such as the flight operations system, data pipelines, archives, etc). Moreover, using the Astronomer’s Proposal Tool (APT), the entire telescope commissioning program has been implemented, reviewed, and is ready for execution. Between now and launch our teams will continue preparations for JWST commissioning, including further rehearsals and testing, to ensure a successful alignment of JWST’s telescope optics.
Continuous cultivation of photosynthetic microorganisms: Approaches, applications and future trends.
Fernandes, Bruno D; Mota, Andre; Teixeira, Jose A; Vicente, Antonio A
2015-11-01
The possibility of using photosynthetic microorganisms, such as cyanobacteria and microalgae, for converting light and carbon dioxide into valuable biochemical products has raised the need for new cost-efficient processes ensuring a constant product quality. Food, feed, biofuels, cosmetics and pharmaceutics are among the sectors that can profit from the application of photosynthetic microorganisms. Biomass growth in a photobioreactor is a complex process influenced by multiple parameters, such as photosynthetic light capture and attenuation, nutrient uptake, photobioreactor hydrodynamics and gas-liquid mass transfer. In order to optimize productivity while keeping a standard product quality, a permanent control of the main cultivation parameters is necessary, where the continuous cultivation has shown to be the best option. However it is of utmost importance to recognize the singularity of continuous cultivation of cyanobacteria and microalgae due to their dependence on light availability and intensity. In this sense, this review provides comprehensive information on recent breakthroughs and possible future trends regarding technological and process improvements in continuous cultivation systems of microalgae and cyanobacteria, that will directly affect cost-effectiveness and product quality standardization. An overview of the various applications, techniques and equipment (with special emphasis on photobioreactors) in continuous cultivation of microalgae and cyanobacteria are presented. Additionally, mathematical modeling, feasibility, economics as well as the applicability of continuous cultivation into large-scale operation, are discussed. Copyright © 2015 Elsevier Inc. All rights reserved.
Code of Federal Regulations, 2014 CFR
2014-10-01
... capabilities to ensure compliance with Footnote 5.353A in 47 CFR 2.106 and the priority and real-time... capabilities to ensure compliance with Footnotes 5.353A and the priority and real-time preemption requirements... respect to FSS stations operating with other systems. (1) LES transmissions to MESs must have a priority...
Naval Supply Systems Command Fleet Logistics Center
2012-08-08
Partial small business set - aside is a potential consideration 12-month Base plus two options Synopsis N00604-11-R-3006 on NECO and FedBizOpps...2012 Navy Gold Coast Small Business Procurement Event 8 August 2012 #1 PRIORITY = Operating Forces Support …while ensuring Joint...while ensuring Joint Base Success FedBid.com Reverse Auction Website 8 Small Business Assistance #1 PRIORITY = Operating Forces
Kawamura, Kazuya; Kobayashi, Yo; Fujie, Masakatsu G
2007-01-01
Medical technology has advanced with the introduction of robot technology, making previous medical treatments that were very difficult far more possible. However, operation of a surgical robot demands substantial training and continual practice on the part of the surgeon because it requires difficult techniques that are different from those of traditional surgical procedures. We focused on a simulation technology based on the physical characteristics of organs. In this research, we proposed the development of surgical simulation, based on a physical model, for intra-operative navigation by a surgeon. In this paper, we describe the design of our system, in particular our organ deformation calculator. The proposed simulation system consists of an organ deformation calculator and virtual slave manipulators. We obtained adequate experimental results of a target node at a nearby point of interaction, because this point ensures better accuracy for our simulation model. The next research step would be to focus on a surgical environment in which internal organ models would be integrated into a slave simulation system.
Operation Windshield and the simplification of emergency management.
Andrews, Michael
2016-01-01
Large, complex, multi-stakeholder exercises are the culmination of years of gradual progression through a comprehensive training and exercise programme. Exercises intended to validate training, refine procedures and test processes initially tested in isolation are combined to ensure seamless response and coordination during actual crises. The challenges of integrating timely and accurate situational awareness from an array of sources, including response agencies, municipal departments, partner agencies and the public, on an ever-growing range of media platforms, increase information management complexity in emergencies. Considering that many municipal emergency operations centre roles are filled by staff whose day jobs have little to do with crisis management, there is a need to simplify emergency management and make it more intuitive. North Shore Emergency Management has accepted the challenge of making emergency management less onerous to occasional practitioners through a series of initiatives aimed to build competence and confidence by making processes easier to use as well as by introducing technical tools that can simplify processes and enhance efficiencies. These efforts culminated in the full-scale earthquake exercise, Operation Windshield, which preceded the 2015 Emergency Preparedness and Business Continuity Conference in Vancouver, British Columbia.
DOT National Transportation Integrated Search
2017-11-01
Transportation agencies face continual pressure to ensure the proper allocation of transportation investments and financial resources. Choosing the right set of congestion mitigation and mobility strategies is critical to ensuring the wise applicatio...
InkTag: Secure Applications on an Untrusted Operating System
Hofmann, Owen S.; Kim, Sangman; Dunn, Alan M.; Lee, Michael Z.; Witchel, Emmett
2014-01-01
InkTag is a virtualization-based architecture that gives strong safety guarantees to high-assurance processes even in the presence of a malicious operating system. InkTag advances the state of the art in untrusted operating systems in both the design of its hypervisor and in the ability to run useful applications without trusting the operating system. We introduce paraverification, a technique that simplifies the InkTag hypervisor by forcing the untrusted operating system to participate in its own verification. Attribute-based access control allows trusted applications to create decentralized access control policies. InkTag is also the first system of its kind to ensure consistency between secure data and metadata, ensuring recoverability in the face of system crashes. PMID:24429939
InkTag: Secure Applications on an Untrusted Operating System.
Hofmann, Owen S; Kim, Sangman; Dunn, Alan M; Lee, Michael Z; Witchel, Emmett
2013-01-01
InkTag is a virtualization-based architecture that gives strong safety guarantees to high-assurance processes even in the presence of a malicious operating system. InkTag advances the state of the art in untrusted operating systems in both the design of its hypervisor and in the ability to run useful applications without trusting the operating system. We introduce paraverification , a technique that simplifies the InkTag hypervisor by forcing the untrusted operating system to participate in its own verification. Attribute-based access control allows trusted applications to create decentralized access control policies. InkTag is also the first system of its kind to ensure consistency between secure data and metadata, ensuring recoverability in the face of system crashes.
Boone, Brian A; Zenati, Mazen; Hogg, Melissa E; Steve, Jennifer; Moser, Arthur James; Bartlett, David L; Zeh, Herbert J; Zureikat, Amer H
2015-05-01
Quality assessment is an important instrument to ensure optimal surgical outcomes, particularly during the adoption of new surgical technology. The use of the robotic platform for complex pancreatic resections, such as the pancreaticoduodenectomy, requires close monitoring of outcomes during its implementation phase to ensure patient safety is maintained and the learning curve identified. To report the results of a quality analysis and learning curve during the implementation of robotic pancreaticoduodenectomy (RPD). A retrospective review of a prospectively maintained database of 200 consecutive patients who underwent RPD in a large academic center from October 3, 2008, through March 1, 2014, was evaluated for important metrics of quality. Patients were analyzed in groups of 20 to minimize demographic differences and optimize the ability to detect statistically meaningful changes in performance. Robotic pancreaticoduodenectomy. Optimization of perioperative outcome parameters. No statistical differences in mortality rates or major morbidity were noted during the study. Statistical improvements in estimated blood loss and conversions to open surgery occurred after 20 cases (600 mL vs 250 mL [P = .002] and 35.0% vs 3.3% [P < .001], respectively), incidence of pancreatic fistula after 40 cases (27.5% vs 14.4%; P = .04), and operative time after 80 cases (581 minutes vs 417 minutes [P < .001]). Complication rates, lengths of stay, and readmission rates showed continuous improvement that did not reach statistical significance. Outcomes for the last 120 cases (representing optimized metrics beyond the learning curve) included a mean operative time of 417 minutes, median estimated blood loss of 250 mL, a conversion rate of 3.3%, 90-day mortality of 3.3%, a clinically significant (grade B/C) pancreatic fistula rate of 6.9%, and a median length of stay of 9 days. Continuous assessment of quality metrics allows for safe implementation of RPD. We identified several inflexion points corresponding to optimization of performance metrics for RPD that can be used as benchmarks for surgeons who are adopting this technology.
Data acquisition, remote control and equipment monitoring for ISOLDE RILIS
NASA Astrophysics Data System (ADS)
Rossel, R. E.; Fedosseev, V. N.; Marsh, B. A.; Richter, D.; Rothe, S.; Wendt, K. D. A.
2013-12-01
With a steadily increasing on-line operation time up to a record 3000 h in the year 2012, the Resonance Ionization Laser Ion Source (RILIS) is one of the key components of the ISOLDE on-line isotope user facility at CERN. Ion beam production using the RILIS is essential for many experiments due to the unmatched combination of ionization efficiency and selectivity. To meet the reliability requirements the RILIS is currently operated in shift duty for continuous maintenance of crucial laser parameters such as wavelength, power, beam position and timing, as well as ensuring swift intervention in case of an equipment malfunction. A recent overhaul of the RILIS included the installation of new pump lasers, commercial dye lasers and a complementary, fully solid-state titanium:sapphire laser system. The framework of the upgrade also required the setup of a network-extended, LabVIEW-based system for data acquisition, remote control and equipment monitoring, to support RILIS operators as well as ISOLDE users. The system contributes to four key aspects of RILIS operation: equipment monitoring, machine protection, automated self-reliance, and collaborative data acquisition. The overall concept, technologies used, implementation status and recent applications during the 2012 on-line operation period will be presented along with a summary of future developments.
The Mauna Kea Weather Center: Custom Atmospheric Forecasting Support for Mauna Kea
NASA Astrophysics Data System (ADS)
Businger, Steven
2011-03-01
The success of operations at Mauna Kea Observatories is strongly influenced by weather conditions. The Mauna Kea Weather Center, an interdisciplinary research program, was established in 1999 to develop and provide custom weather support for Mauna Kea Observatories. The operational forecasting goals of the program are to facilitate the best possible use of favorable atmospheric conditions for scientific benefit and to ensure operational safety. During persistent clear periods, astronomical observing quality varies substantially due to changes in the vertical profiles of temperature, wind, moisture, and turbulence. Cloud and storm systems occasionally cause adverse or even hazardous conditions. A dedicated, daily, real-time mesoscale numerical modeling effort provides crucial forecast guidance in both cases. Several key atmospheric variables are forecast with sufficient skill to be of operational and scientific benefit to the telescopes on Mauna Kea. Summit temperature forecasts allow mirrors to be set to the ambient temperature to reduce image distortion. Precipitable water forecasts allow infrared observations to be prioritized according to atmospheric opacity. Forecasts of adverse and hazardous conditions protect the safety of personnel and allow for scheduling of maintenance when observing is impaired by cloud. The research component of the project continues to improve the accuracy and content of the forecasts. In particular, case studies have resulted in operational forecasts of astronomical observing quality, or seeing.
Upgrade to the control system of the reflectometry diagnostic of ASDEX upgrade
NASA Astrophysics Data System (ADS)
Graça, S.; Santos, J.; Manso, M. E.
2004-10-01
The broadband frequency modulation-continuous wave microwave/millimeter wave reflectometer of ASDEX upgrade tokamak (Institut für Plasma Physik (IPP), Garching, Germany) developed by Centro de Fusão Nuclear (Lisboa, Portugal) with the collaboration of IPP, is a complex system with 13 channels (O and X modes) and two types of operation modes (swept and fixed frequency). The control system that ensures remote operation of the diagnostic incorporates VME and CAMAC bus based acquisition/timing systems. Microprocessor input/output boards are used to control and monitor the microwave circuitry and associated electronic devices. The implementation of the control system is based on an object-oriented client/server model: a centralized server manages the hardware and receives input from remote clients. Communication is handled through transmission control protocol/internet protocol sockets. Here we describe recent upgrades of the control system aiming to: (i) accommodate new channels; (ii) adapt to the heterogeneity of computing platforms and operating systems; and (iii) overcome remote access restrictions. Platform and operating system independence was achieved by redesigning the graphical user interface in JAVA. As secure shell is the standard remote access protocol adopted in major fusion laboratories, secure shell tunneling was implemented to allow remote operation of the diagnostic through the existing firewalls.
Life Cycle Cost Growth Study for the Discovery and New Frontiers Program Office
NASA Technical Reports Server (NTRS)
Barley, Bryan; Gilbert, Paul; Newhouse, Marilyn
2010-01-01
The D&NF Program Office LCC Management Study provides a detailed look at the drivers underlying cost overruns and schedule delays for five D&NF missions. While none of the findings are new, the study underlines the importance of continued emphasis on sound project management techniques: a clean project management structure with a clear definition of roles and responsibilities across the various partners in a project, an understanding of institutional standards and procedures and any differences among the partners, and the critical need for a comprehensive IMS that can be used easily and routinely to identify potential threats to the critical path. The study also highlights the continuing need for realistic estimates of the total LCC. Sufficient time and resources must be allocated early in a project to ensure that the appropriate trade studies and analyses are performed across all aspects of a mission: spacecraft, ground system, operations concept, and fault management, to ensure that proposed and confirmed costs truly reflect the resource requirements over the entire mission life cycle. These studies need to include a realistic review of the assumptions underlying the use of new technologies, the integration of heritage and new hardware and software into the total mission environment, and any development and test savings based on heritage technology and lessons learned. Finally, the LCC Management Study stresses the need to listen to, carefully consider, and take positive action regarding the issues raised during reviews by the expert review teams.
Managing Records for the Long Term - 12363
DOE Office of Scientific and Technical Information (OSTI.GOV)
Montgomery, John V.; Gueretta, Jeanie
The U.S. Department of Energy (DOE) is responsible for managing vast amounts of information documenting historical and current operations. This information is critical to the operations of the DOE Office of Legacy Management. Managing legacy records and information is challenging in terms of accessibility and changing technology. The Office of Legacy Management is meeting these challenges by making records and information management an organizational priority. The Office of Legacy Management mission is to manage DOE post-closure responsibilities at former Cold War weapons sites to ensure the future protection of human health and the environment. These responsibilities include environmental stewardship andmore » long-term preservation and management of operational and environmental cleanup records associated with each site. A primary organizational goal for the Office of Legacy Management is to 'Preserve, Protect, and Share Records and Information'. Managing records for long-term preservation is an important responsibility. Adequate and dedicated resources and management support are required to perform this responsibility successfully. Records tell the story of an organization and may be required to defend an organization in court, provide historical information, identify lessons learned, or provide valuable information for researchers. Loss of records or the inability to retrieve records because of poor records management processes can have serious consequences and even lead to an organisation's downfall. Organizations must invest time and resources to establish a good records management program because of its significance to the organization as a whole. The Office of Legacy Management will continue to research and apply innovative ways of doing business to ensure that the organization stays at the forefront of effective records and information management. DOE is committed to preserving records that document our nation's Cold War legacy, and the Office of Legacy Management will keep records management as a high priority. (authors)« less
NATIONAL GEOSCIENCE DATA REPOSITORY SYSTEM PHASE III: IMPLEMENTATION AND OPERATION ON THE REPOSITORY
DOE Office of Scientific and Technical Information (OSTI.GOV)
Marcus Milling
2001-10-01
The NGDRS has attained 72% of its targeted goal for cores and cuttings transfers, with over 12 million linear feet of cores and cuttings, in addition to large numbers of paleontological samples and are now available for public use. Additionally, large-scale transfers of seismic data have been evaluated, but based on the recommendation of the NGDRS steering committee, cores have been given priority because of the vast scale of the seismic data problem relative to the available funding. The rapidly changing industry conditions have required that the primary core and cuttings preservation strategy evolve as well. Additionally, the NGDRS clearinghousemore » is evaluating the viability of transferring seismic data covering the western shelf of the Florida Gulf Coast. AGI remained actively involved in assisting the National Research Council with background materials and presentations for their panel convened to study the data preservation issue. A final report of the panel is expected in early 2002. GeoTrek has been ported to Linux and MySQL, ensuring a purely open-source version of the software. This effort is key in ensuring long-term viability of the software so that is can continue basic operation regardless of specific funding levels. Work has commenced on a major revision of GeoTrek, using the open-source MapServer project and its related MapScript language. This effort will address a number of key technology issues that appear to be rising for 2002, including the discontinuation of the use of Java in future Microsoft operating systems. Discussions have been held regarding establishing potential new public data repositories, with hope for final determination in 2002.« less
Day surgery nurses' selection of patient preoperative information.
Mitchell, Mark
2017-01-01
To determine selection and delivery of preoperative verbal information deemed important by nurses to relay to patients immediately prior to day surgery. Elective day-case surgery is expanding, patient turnover is high and nurse-patient contact limited. In the brief time-frame available, nurses must select and precisely deliver information to patients, provide answers to questions and gain compliance to ensure a sustained, co-ordinated patient throughput. Concise information selection is therefore necessary especially given continued day surgery expansion. Electronic questionnaire. A survey investigating nurses' choice of patient information prior to surgery was distributed throughout the UK via email addresses listed on the British Association of Day Surgery member's website (January 2015-April 2015). Participants were requested to undertake the survey within 2-3 weeks, with 137 participants completing the survey giving a 44% response rate. Verbal information deemed most important by nurses preoperatively was checking fasting time, information about procedure/operation, checking medication, ensuring presence of medical records/test results and concluding medical investigations checks. To a lesser extent was theatre environment information, procedure/operation start time and possible time to discharge. Significant differences were established between perceived importance of information and information delivery concerning the procedure/operation and anaesthesia details. Nurses working with competing demands and frequent interruptions, prioritised patient safety information. Although providing technical details during time-limited encounters, efforts were made to individualise provision. A more formal plan of verbal information provision could help ease nurses' cognitive workload and enhance patient satisfaction. This study provides evidence that verbal information provided immediately prior to day surgery may vary with experience. Nurse educators and managers may need to provide greater guidance for such complex care settings as delivery of increasingly technical details during brief encounters is gaining increasing priority. © 2016 John Wiley & Sons Ltd.
One Engine Inoperative (OEI) and Autorotation For Heavy Lift Rotorcraft Systems
NASA Technical Reports Server (NTRS)
Wood, Tom
2012-01-01
Federal Aviation Administration will certainly require the Heavy Lift Rotorcraft to be operated under Category A performance and operations requirements. Because of the weight, no operation will be allowed except Category A according to FAA Part 29.1(c). This means that any where along the flight path, the aircraft must be able to land safely following an engine failure or continue flight. A repeatable flight profile must be developed and executed to ensure that the aircraft can be safely landed or flown away depending on its location on the flight profile. This means that there will be no Height-Velocity testing required as is currently required for Part 29 Category B. Since all the configurations shown to date are different than existing rotorcraft, each type would have to develop their individual requirements under existing special conditions FAA Part 21.17(b). This means the FAA will take the opportunity to negotiate additional requirements or change requirements to ensure safety. For example, since the tiltrotor did not fit normal rotorcraft category, new rules were negotiated between the applicant and the FAA. As a result of this negotiation, performance requirements for Category A were increased. The rules were written in terms of guaranteed performance instead of Category A requirements. Detailed discussion will follow later. The proposed tiltrotor would likely follow along with the current tiltrotor rules with the possibility of increase Category A performance requirements. Compounding with addition of wing and auxiliary thrust to both the tandem and coaxial rotor would result in new special condition aircraft. To my knowledge, no compound tandem or compound coaxial rotor has ever been certified by FAA.
28 CFR 115.322 - Policies to ensure referrals of allegations for investigations.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Policies to ensure referrals of allegations for investigations. 115.322 Section 115.322 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Standards for Juvenile Facilities Responsive...
28 CFR 115.322 - Policies to ensure referrals of allegations for investigations.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Policies to ensure referrals of allegations for investigations. 115.322 Section 115.322 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Standards for Juvenile Facilities Responsive...
28 CFR 115.322 - Policies to ensure referrals of allegations for investigations.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Policies to ensure referrals of allegations for investigations. 115.322 Section 115.322 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Standards for Juvenile Facilities Responsive...
NPOESS Preparatory Project Validation Program for Atmsophere Data Products from VIIRS
NASA Astrophysics Data System (ADS)
Starr, D.; Wong, E.
2009-12-01
The National Polar-orbiting Operational Environmental Satellite Suite (NPOESS) Program, in partnership with National Aeronautical Space Administration (NASA), will launch the NPOESS Preparatory Project (NPP), a risk reduction and data continuity mission, prior to the first operational NPOESS launch. The NPOESS Program, in partnership with Northrop Grumman Aerospace Systems (NGAS), will execute the NPP Validation program to ensure the data products comply with the requirements of the sponsoring agencies. Data from the NPP Visible/Infrared Imager/Radiometer Suite (VIIRS) will be used to produce Environmental Data Records (EDR's) for aerosol and clouds, specifically Aerosol Optical Thickness (AOT), Aerosol Particle Size Parameter (APSP), and Suspended Matter (SM); and Cloud Optical Thickness (COT), Cloud Effective Particle Size (CEPS), Cloud Top Temperature (CTT), Height (CTH) and Pressure (CTP), and Cloud Base Height (CBH). The Aerosol and Cloud EDR Validation Program is a multifaceted effort to characterize and validate these data products. The program involves systematic comparison to heritage data products, e.g., MODIS, and ground-based correlative data, such as AERONET and ARM data products, and potentially airborne field measurements. To the extent possible, the domain is global. The program leverages various investments that have and are continuing to be made by national funding agencies in such resources, as well as the operational user community and the broad Earth science user community. This presentation will provide an overview of the approaches, data and schedule for the validation of the NPP VIIRS Aerosol and Cloud environmental data products.
Career Profile- Subscale UAS engineer/pilot Robert "Red" Jensen- Operations Engineering Branch
2015-08-03
Robert “Red” Jensen is an Operations Engineer and Pilot for subscale aircraft here at NASA’s Armstrong Flight Research Center. As part fabricator, engineer and integrator, Red is responsible for testing subscale models of aircraft and ensuring they are safe, capable of flight and ready to support the center’s needs. Operations engineers are key leaders from technical concept to flight to ensure flight safety and mission success. This video highlights Red’s responsibilities and daily activities as well as some of the projects and missions he is currently working on.
DefenseLink Special: Coverage of the Oct. 15, 2005 Iraqi Constitutional
* Operation River Gate Set Conditions * Iraqi, American Troops Ensure Safe Election * 48th Brigade Prepared Referendum * Military Officials Note River Gate Successes 82nd Airborne Paratroopers Help Ensure Safe
Improvement of Productivity in TIG Welding Plant by Equipment Design in Orbit
NASA Astrophysics Data System (ADS)
Gnanavel, C.; Saravanan, R.; Chandrasekaran, M.; Jayakanth, J. J.
2017-03-01
Measurements and improvements are very indispensable task at all levels of management. Here some samples are, at operator level: Measuring operating parameters to ensure OEE (Overall Equipment Effectiveness) and measuring Q components performance to ensure quality, at supervisory level: measuring operator’s performance to ensure labour utility at managerial level: production and productivity measurements and at top level capital and capacity utilization. An often accepted statement is “Improvement is impossible without measurement”. Measurements often referred as observation. The case study was conducted at Government Boiler factory in India. The scientific approach followed for indentifying non value added activities. Personalised new equipment designed and installed to achieve productivity improvement of 85% for a day. The new equipment can serve 360o around its axis hence it simplified loading and unloading procedures as well as reduce their times and ensured effective space and time.
2014-04-17
CAPE CANAVERAL, Fla. - Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, work continues to remove the sprocket shaft assembly from the C truck of crawler-transporter 2, or CT-2. The sprocket assemblies will be placed into shipping cradles on pallets and positioned on a flatbed trailer. They will be sent to a vendor for inspections and refurbishment. Work continues in high bay 2 to upgrade CT-2. The modifications are designed to ensure CT-2’s ability to transport launch vehicles currently in development, such as the agency’s Space Launch System, to the launch pad. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform and the Apollo-Saturn V rockets and, later, space shuttles to Launch Pads 39A and B. For more information, visit: http://www.nasa.gov/exploration/systems/ground/crawler-transporter. Photo credit: NASA/Dimitri Gerondidakis
2014-01-03
TITUSVILLE, Fla. – Members of the news media are given an up-close look at the Tracking and Data Relay Satellite, or TDRS-L, spacecraft undergoing preflight processing inside the Astrotech payload processing facility in Titusville. TDRS-L is being prepared for encapsulation inside its payload fairing prior to being transported to Launch Complex 41 at Cape Canaveral Air Force Station. Journalists visited Astrotech as part of TDRS-L Media Day to conduct interviews and photograph the satellite that will be a part of the second of three next-generation spacecraft designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay contact with orbiting spacecraft ranging from the International Space Station and Hubble Space Telescope to the array of scientific observatories. For more information, visit: http://www.nasa.gov/mission_pages/tdrs/home/index.html
Landsat: A global land-observing program
,
2005-01-01
Landsat represents the world’s longest continuously acquired collection of space-based land remote sensing data. The Landsat Project is a joint initiative of the U.S. Geological Survey (USGS) and the National Aeronautics and Space Administration (NASA) designed to gather Earth resource data from space. NASA developed and launched the spacecrafts, while the USGS handles the operations, maintenance, and management of all ground data reception, processing, archiving, product generation, and distribution.Landsat satellites have been collecting images of the Earth’s surface for more than thirty years. Landsat’s Global Survey Mission is to repeatedly capture images of the Earth’s land mass, coastal boundaries, and coral reefs, and to ensure that sufficient data are acquired to support the observation of changes on the Earth’s land surface and surrounding environment. NASA launched the first Landsat satellite in 1972, and the most recent one, Landsat 7, in 1999. Landsats 5 and 7 continue to capture hundreds of additional images of the Earth’s surface each day. These images provide a valuable resource for people who work
NASA Technical Reports Server (NTRS)
Narasimhan, Sriram; Dearden, Richard; Benazera, Emmanuel
2004-01-01
Fault detection and isolation are critical tasks to ensure correct operation of systems. When we consider stochastic hybrid systems, diagnosis algorithms need to track both the discrete mode and the continuous state of the system in the presence of noise. Deterministic techniques like Livingstone cannot deal with the stochasticity in the system and models. Conversely Bayesian belief update techniques such as particle filters may require many computational resources to get a good approximation of the true belief state. In this paper we propose a fault detection and isolation architecture for stochastic hybrid systems that combines look-ahead Rao-Blackwellized Particle Filters (RBPF) with the Livingstone 3 (L3) diagnosis engine. In this approach RBPF is used to track the nominal behavior, a novel n-step prediction scheme is used for fault detection and L3 is used to generate a set of candidates that are consistent with the discrepant observations which then continue to be tracked by the RBPF scheme.
Major thoracic surgery in Jehovah's witness: A multidisciplinary approach case report
Rispoli, Marco; Bergaminelli, Carlo; Nespoli, Moana Rossella; Esposito, Mariana; Mattiacci, Dario Maria; Corcione, Antonio; Buono, Salvatore
2016-01-01
Introduction A bloodless surgery can be desirable also for non Jehovah’s witnesses patients, but requires a team approach from the very first assessment to ensure adequate planning. Presentation of the case Our patient, a Jehovah’s witnesses, was scheduled for right lower lobectomy due to pulmonary adenocarcinoma. Her firm denies to receive any kind of transfusions, forced clinicians to a bloodless management of the case. Discussion Before surgery a meticulous coagulopathy research and hemodynamic optimization are useful to prepare patient to operation. During surgery, controlled hypotension can help to obtain effective hemostasis. After surgery, clinicians monitored any possible active bleeding, using continuous noninvasive hemoglobin monitoring, limiting the blood loss due to serial in vitro testing. The optimization of cardiac index and delivery of oxygen were continued to grant a fast recovery. Conclusion Bloodless surgery is likely to gain popularity, and become standard practice for all patients. The need for transfusion should be targeted on individual case, avoiding strictly fixed limit often leading to unnecessary transfusion. PMID:27107502
77 FR 55715 - Medical Area Body Network
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-11
... operating in accordance with the rules. 13. The 2370-2390 MHz band is used for radio astronomy operations in... to ensure protection of radio astronomy operations at the Arecibo site. 14. Lastly, the Commission...
Potential Operating Orbits for Fission Electric Propulsion Systems Driven by the SAFE-400
NASA Technical Reports Server (NTRS)
Houts, Mike; Kos, Larry; Poston, David; Rodgers, Stephen L. (Technical Monitor)
2002-01-01
Safety must be ensured during all phases of space fission system design, development, fabrication, launch, operation, and shutdown. One potential space fission system application is fission electric propulsion (FEP), in which fission energy is converted into electricity and used to power high efficiency (Isp greater than 3000s) electric thrusters. For these types of systems it is important to determine which operational scenarios ensure safety while allowing maximum mission performance and flexibility. Space fission systems are essentially nonradioactive at launch, prior to extended operation at high power. Once high power operation begins, system radiological inventory steadily increases as fission products build up. For a given fission product isotope, the maximum radiological inventory is typically achieved once the system has operated for a length of time equivalent to several half-lives. After that time, the isotope decays at the same rate it is produced, and no further inventory builds in. For an FEP mission beginning in Earth orbit, altitude and orbital lifetime increase as the propulsion system operates. Two simultaneous effects of fission propulsion system operation are thus (1) increasing fission product inventory and (2) increasing orbital lifetime. Phrased differently, as fission products build up, more time is required for the fission products to naturally convert back into non-radioactive isotopes. Simultaneously, as fission products build up, orbital lifetime increases, providing more time for the fission products to naturally convert back into non-radioactive isotopes. Operational constraints required to ensure safety can thus be quantified.
Potential operating orbits for fission electric propulsion systems driven by the SAFE-400
NASA Astrophysics Data System (ADS)
Houts, Mike; Kos, Larry; Poston, David
2002-01-01
Safety must be ensured during all phases of space fission system design, development, fabrication, launch, operation, and shutdown. One potential space fission system application is fission electric propulsion (FEP), in which fission energy is converted into electricity and used to power high efficiency (Isp>3000s) electric thrusters. For these types of systems it is important to determine which operational scenarios ensure safety while allowing maximum mission performance and flexibility. Space fission systems are essentially non-radioactive at launch, prior to extended operation at high power. Once high power operation begins, system radiological inventory steadily increases as fission products build up. For a given fission product isotope, the maximum radiological inventory is typically achieved once the system has operated for a length of time equivalent to several half-lives. After that time, the isotope decays at the same rate it is produced, and no further inventory builds in. For an FEP mission beginning in Earth orbit, altitude and orbital lifetime increase as the propulsion system operates. Two simultaneous effects of fission propulsion system operation are thus (1) increasing fission product inventory and (2) increasing orbital lifetime. Phrased differently, as fission products build up, more time is required for the fission products to naturally convert back into non-radioactive isotopes. Simultaneously, as fission products build up, orbital lifetime increases, providing more time for the fission products to naturally convert back into non-radioactive isotopes. Operational constraints required to ensure safety can thus be quantified. .
Good Work Ensures Employment Success. Myths and Realities No. 2.
ERIC Educational Resources Information Center
Brown, Bettina Lankard
It is a myth that skills alone ensure employment. Other keys to workplace success include continuous learning, emotional intelligence, networking, flexibility, and commitment to business objectives. Although academic degrees, skill certifications, and other documentation of accomplishments provide access to employment, they are significant only at…
28 CFR 115.122 - Policies to ensure referrals of allegations for investigations.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Policies to ensure referrals of allegations for investigations. 115.122 Section 115.122 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Standards for Lockups Responsive Planning § 115...
28 CFR 115.122 - Policies to ensure referrals of allegations for investigations.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Policies to ensure referrals of allegations for investigations. 115.122 Section 115.122 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Standards for Lockups Responsive Planning § 115...
28 CFR 115.122 - Policies to ensure referrals of allegations for investigations.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Policies to ensure referrals of allegations for investigations. 115.122 Section 115.122 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Standards for Lockups Responsive Planning § 115...
From Eradication to Resistance: Five Continuing Concerns About Pediculosis.
ERIC Educational Resources Information Center
Brainerd, Elaine
1998-01-01
Discusses the five major concerns that govern a school nurse's thinking in managing head louse infestations, including dispelling misconceptions about head lice; ensuring that infestations are not missed; ensuring that parents understand instructions for effective treatment; educating the community about the correct use of pediculicides; and…
34 CFR 602.18 - Ensuring consistency in decision-making.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 34 Education 3 2010-07-01 2010-07-01 false Ensuring consistency in decision-making. 602.18 Section 602.18 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION THE SECRETARY'S RECOGNITION OF ACCREDITING AGENCIES The...
Code of Federal Regulations, 2010 CFR
2010-01-01
... establishes the methodology for computing the risk-based capital level for each Enterprise. The board of directors of each Enterprise is responsible for ensuring that the Enterprise maintains total capital at a level that is sufficient to ensure the continued financial viability of the Enterprise and is equal to...
Quality improvement in the use of medications through a drug use evaluation service.
Stevenson, J G; Bakst, C M; Zaran, F K; Rybak, M J; Smolarek, R T; Alexander, M R
1992-10-01
Continuous quality improvement methods have the potential to improve processes that cross several disciplines. The medication system is one in which coordination of activities between physicians, pharmacists, and nurses is essential for optimal therapy to occur. DUE services can play an important role in helping to ensure that patients receive high-quality pharmaceutical care. It is necessary for pharmacy managers to review the structure, goals, and outcomes of their DUE programs to ensure that they are consistent with a philosophy of continuous improvement in the quality of drug therapy.
Sandrock, Christian
2010-04-01
To provide recommendations and standard operating procedures (SOPs) for intensive care unit (ICU) and hospital preparations for an influenza pandemic or mass disaster with a specific focus on manpower. Based on a literature review and expert opinion, a Delphi process was used to define the essential topics including manpower. Key recommendations include: (1) plan to access, coordinate and increase labor resources for continued and expanded ICU care including increasing critical care specialists and expanded practice for non-critical care personnel; (2) develop an education, awareness, preparation and communication program to ensure a well-protected and prepared workforce with coordinated rapid manpower expansion; (3) maintain a central inventory of all clinical and non-clinical staff with their current roles along with possible emergency re-training possibilities; (4) coordinate all clinical and non-clinical staffing requirements and determine the hospital's daily needs including a sick and no-show list together with ICU requirements; (5) provide clinical care to patients only with clinical staff and not with non-clinical staff; (6) delegate duties not within the scope of workers' practice under crisis conditions with proper supervision and support from experienced clinicians to ensure patient safety; (7) intensivists should supervise nonintensivist physicians to expand the workforce if patient surge exceeds the number of available ICU-trained specialists. Judicious planning and adoption of protocols for providing adequate manpower are necessary to optimize outcomes during a pandemic.
Dynamically protected cat-qubits: a new paradigm for universal quantum computation
NASA Astrophysics Data System (ADS)
Mirrahimi, Mazyar; Leghtas, Zaki; Albert, Victor V.; Touzard, Steven; Schoelkopf, Robert J.; Jiang, Liang; Devoret, Michel H.
2014-04-01
We present a new hardware-efficient paradigm for universal quantum computation which is based on encoding, protecting and manipulating quantum information in a quantum harmonic oscillator. This proposal exploits multi-photon driven dissipative processes to encode quantum information in logical bases composed of Schrödinger cat states. More precisely, we consider two schemes. In a first scheme, a two-photon driven dissipative process is used to stabilize a logical qubit basis of two-component Schrödinger cat states. While such a scheme ensures a protection of the logical qubit against the photon dephasing errors, the prominent error channel of single-photon loss induces bit-flip type errors that cannot be corrected. Therefore, we consider a second scheme based on a four-photon driven dissipative process which leads to the choice of four-component Schrödinger cat states as the logical qubit. Such a logical qubit can be protected against single-photon loss by continuous photon number parity measurements. Next, applying some specific Hamiltonians, we provide a set of universal quantum gates on the encoded qubits of each of the two schemes. In particular, we illustrate how these operations can be rendered fault-tolerant with respect to various decoherence channels of participating quantum systems. Finally, we also propose experimental schemes based on quantum superconducting circuits and inspired by methods used in Josephson parametric amplification, which should allow one to achieve these driven dissipative processes along with the Hamiltonians ensuring the universal operations in an efficient manner.
Measurement and evaluation of percolation drainage systems capacity in real conditions
NASA Astrophysics Data System (ADS)
Markovic, G.; Zelenakova, M.
2017-10-01
The drainage system must ensure a safe disposal of the surface water without endangering the buildings and safety of people. Despite the common use of rainwater infiltration facilities, there is still only limited data available evaluating the long-term capacity of such systems especially for underground infiltration facilities. This study presents experimental measurements and evaluation of long-term infiltration efficiency in real conditions and emphasizes the importance of hydrogeological survey. The measurements of infiltration efficiency were applied to an existing percolation drainage system - infiltration shafts. Infiltration shafts were made in year 2007 so that its drainage operation takes more than 8 years. This study was started in 2011 and still continues and presents 5 years measurements of infiltration efficiency for this infiltration facility.
Instrumentation complex for Langley Research Center's National Transonic Facility
NASA Technical Reports Server (NTRS)
Russell, C. H.; Bryant, C. S.
1977-01-01
The instrumentation discussed in the present paper was developed to ensure reliable operation for a 2.5-meter cryogenic high-Reynolds-number fan-driven transonic wind tunnel. It will incorporate four CPU's and associated analog and digital input/output equipment, necessary for acquiring research data, controlling the tunnel parameters, and monitoring the process conditions. Connected in a multipoint distributed network, the CPU's will support data base management and processing; research measurement data acquisition and display; process monitoring; and communication control. The design will allow essential processes to continue, in the case of major hardware failures, by switching input/output equipment to alternate CPU's and by eliminating nonessential functions. It will also permit software modularization by CPU activity and thereby reduce complexity and development time.
A Novel Process Audit for Standardized Perioperative Handoff Protocols.
Pallekonda, Vinay; Scholl, Adam T; McKelvey, George M; Amhaz, Hassan; Essa, Deanna; Narreddy, Spurthy; Tan, Jens; Templonuevo, Mark; Ramirez, Sasha; Petrovic, Michelle A
2017-11-01
A perioperative handoff protocol provides a standardized delivery of communication during a handoff that occurs from the operating room to the postanestheisa care unit or ICU. The protocol's success is dependent, in part, on its continued proper use over time. A novel process audit was developed to help ensure that a perioperative handoff protocol is used accurately and appropriately over time. The Audit Observation Form is used for the Audit Phase of the process audit, while the Audit Averages Form is used for the Data Analysis Phase. Employing minimal resources and using quantitative methods, the process audit provides the necessary means to evaluate the proper execution of any perioperative handoff protocol. Copyright © 2017 The Joint Commission. Published by Elsevier Inc. All rights reserved.
Conversion of olefins to liquid motor fuels
Rabo, Jule A.; Coughlin, Peter K.
1988-01-01
Linear and/or branched claim C.sub.2 to C.sub.12 olefins are converted to hydrocarbon mixtures suitable for use as liquid motor fuels by contact with a catalyst capable of ensuring the production of desirable products with only a relatively minor amount of heavy products boiling beyond the diesel oil range. The catalyst having desirable stability during continuous production operations, comprises a steam stabilized zeolite Y catalyst of hydrophobic character, desirably in aluminum-extracted form. The olefins such as propylene, may be diluted with inerts, such as paraffins or with water, the latter serving to moderate the acidity of the catalyst, or to further moderate the activity of the aluminum-extracted catalyst, so as to increase the effective life of the catalyst.
Linnehan on EVA 2 - during Expedition 16 / STS-123 Joint Operations
2008-03-16
S123-E-006790 (15/16 March 2008) --- Astronauts Mike Foreman and Rick Linnehan (partially out of frame), both STS-123 mission specialists, participate in the mission's second scheduled session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the 7-hour, 8-minute spacewalk, Linnehan and Foreman, assembled the stick-figure-shaped Dextre, also known as the Special Purpose Dextrous Manipulator (SPDM), a task that included attaching its two arms. Designed for station maintenance and service, Dextre is capable of sensing forces and movement of objects it is manipulating. It can automatically compensate for those forces and movements to ensure an object is moved smoothly. Dextre is the final element of the station's Mobile Servicing System.
Linnehan and Foreman on EVA 2 - during Expedition 16 / STS-123 Joint Operations
2008-03-16
S123-E-006788 (15/16 March 2008) --- Astronauts Mike Foreman (left) and Rick Linnehan, both STS-123 mission specialists, participate in the mission's second scheduled session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the 7-hour, 8-minute spacewalk, Linnehan and Foreman, assembled the stick-figure-shaped Dextre, also known as the Special Purpose Dextrous Manipulator (SPDM), a task that included attaching its two arms. Designed for station maintenance and service, Dextre is capable of sensing forces and movement of objects it is manipulating. It can automatically compensate for those forces and movements to ensure an object is moved smoothly. Dextre is the final element of the station's Mobile Servicing System.
Linnehan and Foreman on EVA 2 - during Expedition 16 / STS-123 Joint Operations
2008-03-16
S123-E-006781 (15/16 March 2008) --- Astronauts Rick Linnehan (right) and Mike Foreman, both STS-123 mission specialists, participate in the mission's second scheduled session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the 7-hour, 8-minute spacewalk, Linnehan and Foreman, assembled the stick-figure-shaped Dextre, also known as the Special Purpose Dextrous Manipulator (SPDM), a task that included attaching its two arms. Designed for station maintenance and service, Dextre is capable of sensing forces and movement of objects it is manipulating. It can automatically compensate for those forces and movements to ensure an object is moved smoothly. Dextre is the final element of the station's Mobile Servicing System.
Report: EPA Needs to Fulfill Its Designated Responsibilities to Ensure Effective BioWatch Program
Report #2005-P-00012, March 23, 2005. EPA did not provide adequate oversight of the sampling operations to ensure quality assurance guidance was adhered to, potentially affecting the quality of the samples taken.
Comparative study of gas-analyzing systems designed for continuous monitoring of TPP emissions
NASA Astrophysics Data System (ADS)
Kondrat'eva, O. E.; Roslyakov, P. V.
2017-06-01
Determining the composition of combustion products is important in terms of both control of emissions into the atmosphere from thermal power plants and optimization of fuel combustion processes in electric power plants. For this purpose, the concentration of oxygen, carbon monoxide, nitrogen, and sulfur oxides in flue gases is monitored; in case of solid fuel combustion, fly ash concentration is monitored as well. According to the new nature conservation law in Russia, all large TPPs shall be equipped with continuous emission monitoring and measurement systems (CEMMS) into the atmosphere. In order to ensure the continuous monitoring of pollutant emissions, direct round-the-clock measurements are conducted with the use of either domestically produced or imported gas analyzers and analysis systems, the operation of which is based on various physicochemical methods and which can be generally used when introducing CEMMS. Depending on the type and purposes of measurement, various kinds of instruments having different features may be used. This article represents a comparative study of gas-analysis systems for measuring the content of polluting substances in exhaust gases based on various physical and physicochemical analysis methods. It lists basic characteristics of the methods commonly applied in the area of gas analysis. It is proven that, considering the necessity of the long-term, continuous operation of gas analyzers for monitoring and measurement of pollutant emissions into the atmosphere, as well as the requirements for reliability and independence from aggressive components and temperature of the gas flow, it is preferable to use optical gas analyzers for the aforementioned purposes. In order to reduce the costs of equipment comprising a CEMMS at a TPP and optimize the combustion processes, electrochemical and thermomagnetic gas analyzers may also be used.
Overview of NASA GRC Stirling Technology Development
NASA Technical Reports Server (NTRS)
Schreiber, Jeffrey G.; Thieme, Lanny G.
2004-01-01
The Stirling Radioisotope Generator (SRG) is currently being developed by Lockheed Martin Astronautics (LMA) under contract to the Department of Energy (DOE). The generator will be a high efficiency electric power source for NASA Space Science missions with the ability to operate in vacuum or in an atmosphere such as on Mars. High efficiency is obtained through the use of free-piston Stirling power conversion. Power output will be greater than 100 watts at the beginning of life with the decline in power largely due to the decay of the plutonium heat source. In support of the DOE SRG project, the NASA Glenn Research Center (GRC) has established a technology effort to provide data to ensure a successful transition to flight for what will be the first dynamic power system in space. Initially, a limited number of areas were selected for the effort, however this is now being expanded to more thoroughly cover key technical issues. There is also an advanced technology effort that is complementary to the near-term technology effort. Many of the tests use the 55-We Technology Demonstration Convertor (TDC). There have been multiple controller tests to support the LMA flight controller design effort. Preparation is continuing for a thermal/vacuum system demonstration. A pair of flight prototype TDC s have been placed on continuous operation. Heater head life assessment continues, with the material data being refined and the analysis moving toward the system perspective. Magnet aging tests continue to characterize any possible aging in the strength or demagnetization resistance of the magnets in the linear alternator. A reliability effort has been initiated to help guide the development activities with focus on the key components and subsystems. This paper will provide an overview of some of the GRC technical efforts, including the status, and a description of future efforts.
2013-01-01
Background Integrated into the work in health systems strengthening (HSS) is a growing focus on the importance of ensuring quality of the services delivered and systems which support them. Understanding how to define and measure quality in the different key World Health Organization building blocks is critical to providing the information needed to address gaps and identify models for replication. Description of approaches We describe the approaches to defining and improving quality across the five country programs funded through the Doris Duke Charitable Foundation African Health Initiative. While each program has independently developed and implemented country-specific approaches to strengthening health systems, they all included quality of services and systems as a core principle. We describe the differences and similarities across the programs in defining and improving quality as an embedded process essential for HSS to achieve the goal of improved population health. The programs measured quality across most or all of the six WHO building blocks, with specific areas of overlap in improving quality falling into four main categories: 1) defining and measuring quality; 2) ensuring data quality, and building capacity for data use for decision making and response to quality measurements; 3) strengthened supportive supervision and/or mentoring; and 4) operational research to understand the factors associated with observed variation in quality. Conclusions Learning the value and challenges of these approaches to measuring and improving quality across the key components of HSS as the projects continue their work will help inform similar efforts both now and in the future to ensure quality across the critical components of a health system and the impact on population health. PMID:23819662
7 CFR Exhibit F to Subpart G of... - Implementation Procedures for the Coastal Barrier Resources Act
Code of Federal Regulations, 2011 CFR
2011-01-01
... (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE SERVICE, RURAL UTILITIES SERVICE, AND FARM SERVICE AGENCY, DEPARTMENT OF AGRICULTURE (CONTINUED) PROGRAM REGULATIONS (CONTINUED) GENERAL... distributed by the Department of the Interior. Each State Director is responsible for ensuring that those...
7 CFR Exhibit F to Subpart G of... - Implementation Procedures for the Coastal Barrier Resources Act
Code of Federal Regulations, 2010 CFR
2010-01-01
... (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE SERVICE, RURAL UTILITIES SERVICE, AND FARM SERVICE AGENCY, DEPARTMENT OF AGRICULTURE (CONTINUED) PROGRAM REGULATIONS (CONTINUED) GENERAL... distributed by the Department of the Interior. Each State Director is responsible for ensuring that those...
Planning for Project Continuation.
ERIC Educational Resources Information Center
Berry, Grant, Jr.
Designed to help colleges plan for the successful continuation of educational improvement projects beyond the end of their original funding period, this report presents a case study of Pennsylvania College of Technology's (PCT's) efforts to ensure the continuation of a Title III faculty development program. After describing the the Title III…
Guidelines for riser splash zone design and repair
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-02-01
The many years of offshore oil and gas development has established the subsea pipeline as a reliable and cost effective means of transportation for produced hydrocarbons. The requirement for subsea pipeline systems will continue to move into deeper water and more remote locations with the future development of oil and gas exploration. The integrity of subsea pipeline and riser systems, throughout their operating lifetime, is an important area for operators to consider in maximizing reliability and serviceability for economic, contractual and environmental reasons. Adequate design and installation are the basis for ensuring the integrity of any subsea pipeline and risermore » systems. In the event of system damage, from any source, quick and accurate repair and reinstatement of the pipeline system is essential. This report has been developed to provide guidelines for riser and splash zone design, to perform a detailed overview of existing riser repair techniques and products, and to prepare comprehensive guidelines identifying the capabilities and limits of riser reinstatement systems.« less
Inherently Safe Fission Power System for Lunar Outposts
NASA Astrophysics Data System (ADS)
Schriener, Timothy M.; El-Genk, Mohamed S.
2013-09-01
This paper presents the Solid Core-Sectored Compact Reactor (SC-SCoRe) and power system for future lunar outposts. The power system nominally provides 38 kWe continuously for 21 years, employs static components and has no single point failures in reactor cooling or power generation. The reactor core has six sectors, each has a separate pair of primary and secondary loops with liquid NaK-56 working fluid, thermoelectric (TE) power conversion and heat-pipes radiator panels. The electromagnetic (EM) pumps in the primary and secondary loops, powered with separate TE power units, ensure operation reliability and passive decay heat removal from the reactor after shutdown. The reactor poses no radiological concerns during launch, and remains sufficiently subcritical, with the radial reflector dissembled, when submerged in wet sand and the core flooded with seawater, following a launch abort accident. After 300 years of storage below grade on the Moon, the total radioactivity in the post-operation reactor drops below 164 Ci, a low enough radioactivity for a recovery and safe handling of the reactor.