Science.gov

Sample records for environmental impact final

  1. Final Range Wide Environmental Impact Statement

    DTIC Science & Technology

    2001-07-01

    Pollution Emission Factors AP-42 and Maricopa and Pima counties air documentation applicable to Arizona (U.S. Environmental Protection Agency, 1985...from northern Yuma County in 1983 , YPG became centered in both counties . The City of Yuma is the largest urban center in the region. More than 99...Number of Pages 190 FINAL RANGE WIDE ENVIRONMENTAL IMPACT STATEMENT U.S. Army Yuma Proving Ground Yuma and La Paz Counties , Arizona Prepared for U.S

  2. 23 CFR 771.125 - Final environmental impact statements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Final environmental impact statements. 771.125 Section... ENVIRONMENT ENVIRONMENTAL IMPACT AND RELATED PROCEDURES § 771.125 Final environmental impact statements. (a)(1..., economic, or environmental impacts of the action may need to be more fully explored; (iii) the impacts of...

  3. 23 CFR 771.125 - Final environmental impact statements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Final environmental impact statements. 771.125 Section... ENVIRONMENT ENVIRONMENTAL IMPACT AND RELATED PROCEDURES § 771.125 Final environmental impact statements. (a)(1..., economic, or environmental impacts of the action may need to be more fully explored; (iii) the impacts of...

  4. 23 CFR 771.125 - Final environmental impact statements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Final environmental impact statements. 771.125 Section... ENVIRONMENT ENVIRONMENTAL IMPACT AND RELATED PROCEDURES § 771.125 Final environmental impact statements. (a)(1..., economic, or environmental impacts of the action may need to be more fully explored; (iii) the impacts of...

  5. 23 CFR 771.125 - Final environmental impact statements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Final environmental impact statements. 771.125 Section... ENVIRONMENT ENVIRONMENTAL IMPACT AND RELATED PROCEDURES § 771.125 Final environmental impact statements. (a)(1..., economic, or environmental impacts of the action may need to be more fully explored; (iii) the impacts of...

  6. 23 CFR 771.125 - Final environmental impact statements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Final environmental impact statements. 771.125 Section... ENVIRONMENT ENVIRONMENTAL IMPACT AND RELATED PROCEDURES § 771.125 Final environmental impact statements. (a)(1..., economic, or environmental impacts of the action may need to be more fully explored; (iii) the impacts of...

  7. 10 CFR 51.93 - Distribution of final environmental impact statement and supplement to final environmental impact...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Distribution of final environmental impact statement and supplement to final environmental impact statement; news releases. 51.93 Section 51.93 Energy NUCLEAR... statement and supplement to final environmental impact statement; news releases. (a) A copy of the final...

  8. 10 CFR 51.93 - Distribution of final environmental impact statement and supplement to final environmental impact...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Distribution of final environmental impact statement and supplement to final environmental impact statement; news releases. 51.93 Section 51.93 Energy NUCLEAR... statement and supplement to final environmental impact statement; news releases. (a) A copy of the final...

  9. 10 CFR 51.93 - Distribution of final environmental impact statement and supplement to final environmental impact...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Distribution of final environmental impact statement and supplement to final environmental impact statement; news releases. 51.93 Section 51.93 Energy NUCLEAR... statement and supplement to final environmental impact statement; news releases. (a) A copy of the final...

  10. 10 CFR 51.93 - Distribution of final environmental impact statement and supplement to final environmental impact...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Distribution of final environmental impact statement and supplement to final environmental impact statement; news releases. 51.93 Section 51.93 Energy NUCLEAR... statement and supplement to final environmental impact statement; news releases. (a) A copy of the final...

  11. 10 CFR 51.93 - Distribution of final environmental impact statement and supplement to final environmental impact...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Distribution of final environmental impact statement and supplement to final environmental impact statement; news releases. 51.93 Section 51.93 Energy NUCLEAR... statement and supplement to final environmental impact statement; news releases. (a) A copy of the final...

  12. 40 CFR 124.61 - Final environmental impact statement.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Final environmental impact statement... environmental impact statement. No final NPDES permit for a new source shall be issued until at least 30 days after the date of issuance of a final environmental impact statement if one is required under 40 CFR 6...

  13. 40 CFR 124.61 - Final environmental impact statement.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 23 2013-07-01 2013-07-01 false Final environmental impact statement... environmental impact statement. No final NPDES permit for a new source shall be issued until at least 30 days after the date of issuance of a final environmental impact statement if one is required under 40 CFR 6...

  14. 40 CFR 124.61 - Final environmental impact statement.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 23 2012-07-01 2012-07-01 false Final environmental impact statement... environmental impact statement. No final NPDES permit for a new source shall be issued until at least 30 days after the date of issuance of a final environmental impact statement if one is required under 40 CFR 6...

  15. 40 CFR 124.61 - Final environmental impact statement.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 22 2011-07-01 2011-07-01 false Final environmental impact statement... environmental impact statement. No final NPDES permit for a new source shall be issued until at least 30 days after the date of issuance of a final environmental impact statement if one is required under 40 CFR 6...

  16. 40 CFR 124.61 - Final environmental impact statement.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 22 2014-07-01 2013-07-01 true Final environmental impact statement... environmental impact statement. No final NPDES permit for a new source shall be issued until at least 30 days after the date of issuance of a final environmental impact statement if one is required under 40 CFR 6...

  17. 16 CFR 1.85 - Final environmental impact statements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 16 Commercial Practices 1 2010-01-01 2010-01-01 false Final environmental impact statements. 1.85... Final environmental impact statements. (a) After the close of the comment period, the Bureau responsible for the matter will consider the comments received on the draft environmental impact statement and...

  18. 16 CFR 1.85 - Final environmental impact statements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 16 Commercial Practices 1 2011-01-01 2011-01-01 false Final environmental impact statements. 1.85... Final environmental impact statements. (a) After the close of the comment period, the Bureau responsible for the matter will consider the comments received on the draft environmental impact statement and...

  19. 16 CFR 1.85 - Final environmental impact statements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 16 Commercial Practices 1 2014-01-01 2014-01-01 false Final environmental impact statements. 1.85... Final environmental impact statements. (a) After the close of the comment period, the Bureau responsible for the matter will consider the comments received on the draft environmental impact statement and...

  20. 16 CFR 1.85 - Final environmental impact statements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 16 Commercial Practices 1 2013-01-01 2013-01-01 false Final environmental impact statements. 1.85... Final environmental impact statements. (a) After the close of the comment period, the Bureau responsible for the matter will consider the comments received on the draft environmental impact statement and...

  1. 16 CFR 1.85 - Final environmental impact statements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 16 Commercial Practices 1 2012-01-01 2012-01-01 false Final environmental impact statements. 1.85... Final environmental impact statements. (a) After the close of the comment period, the Bureau responsible for the matter will consider the comments received on the draft environmental impact statement and...

  2. Surplus Plutonium Disposition Final Environmental Impact Statement

    SciTech Connect

    N /A

    1999-11-19

    In December 1996, the U.S. Department of Energy (DOE) published the ''Storage and Disposition of Weapons-Usable Fissile Materials Final Programmatic Environmental Impact Statement (Storage and Disposition PEIS)'' (DOE 1996a). That PEIS analyzes the potential environmental consequences of alternative strategies for the long-term storage of weapons-usable plutonium and highly enriched uranium (HEU) and the disposition of weapons-usable plutonium that has been or may be declared surplus to national security needs. The Record of Decision (ROD) for the ''Storage and Disposition PEIS'', issued on January 14, 1997 (DOE 1997a), outlines DOE's decision to pursue an approach to plutonium disposition that would make surplus weapons-usable plutonium inaccessible and unattractive for weapons use. DOE's disposition strategy, consistent with the Preferred Alternative analyzed in the ''Storage and Disposition PEIS'', allows for both the immobilization of some (and potentially all) of the surplus plutonium and use of some of the surplus plutonium as mixed oxide (MOX) fuel in existing domestic, commercial reactors. The disposition of surplus plutonium would also involve disposal of both the immobilized plutonium and the MOX fuel (as spent nuclear fuel) in a potential geologic repository.

  3. 78 FR 44592 - Final General Management Plan, Final Wilderness Study, and Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-24

    ... National Park Service Final General Management Plan, Final Wilderness Study, and Final Environmental Impact Statement, Fort Pulaski National Monument, Georgia AGENCY: National Park Service, Interior. ACTION: Notice... 1969, 42 U.S.C. 4332(2)(C), the National Park Service (NPS) announces the availability of a...

  4. Ballistic Missile Defense Final Programmatic Environmental Impact Statement

    DTIC Science & Technology

    1994-10-01

    Potential cumulative impacts associated with stratospheric ozone depletion, global climate change, and biodiversity are global rather than local or...environmental documentation. Potential cumulative impacts to biodiversity from the BMD Program and other sources are not expected to be significant and will be...Ballistic Missile Defense Final Programmatic Environmental Impact .Statement Ballistic Missile Defense Organization 19980302 086 BMDOTIC DXC QUAL

  5. 78 FR 32269 - Notice of Availability of the Final Environmental Impact Statement/Environmental Impact Report...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-29

    ... free-flowing river condition and full volitional fish passage as well as other goals expressed in the... Department of Fish and Wildlife have prepared a final environmental impact statement and environmental impact report (EIS/EIR) evaluating the potential effects of removing four privately owned dams on the Klamath...

  6. Final Environmental Impact Statement for Langley

    NASA Technical Reports Server (NTRS)

    1971-01-01

    The Langley Research Center is described, together with the nature of its activities, from which it can be seen that the Center is basically not a major pollution source. Geographical, geological, and climatic charateristics of the site are also described. inasmuch as they influence both the choice of disposal methods and the environmental effects of the pollutants. The known or probable pollution sources at the Center are described. Where the intensities of these sources might exceed the recommended guide-lines, the corrective actions that have been taken or are being taken are described. The entire inventory of pollution sources and control methods is summarized in an appendix.

  7. 77 FR 14416 - Notice of Availability of a Final Environmental Impact Statement and Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-09

    ... Environmental Impact Report for the Pattern Energy Group's Ocotillo Express Wind Energy Project and Proposed California Desert Conservation Area Land Use Plan Amendment, Imperial County, CA AGENCY: Bureau of Land... (FLPMA), the Bureau of Land Management (BLM) has prepared a Proposed California Desert Conservation Area...

  8. 78 FR 40497 - Notice of Availability of the Final Environmental Impact Statement/Environmental Impact Report...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-05

    ... Bureau of Land Management Notice of Availability of the Final Environmental Impact Statement...: Bureau of Land Management, Interior. ACTION: Notice of Availability. SUMMARY: In accordance with the National Environmental Policy Act of 1969, as amended (NEPA); the Federal Land Policy and Management Act of...

  9. Griffith Energy Project Final Environmental Impact Statement

    SciTech Connect

    N /A

    1999-04-02

    Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fuel, combined cycle power plant, on private lands south of Kingman, Ariz. The Project would be a ''merchant plant'' which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner, needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management. Public comments on the Draft EIS are addressed in the Final EIS, including addenda and modifications made as a result of the comments and/or new information.

  10. Yakima Fisheries Project : Final Environmental Impact Statement.

    SciTech Connect

    United States. Bonneville Power Administration; Washington . Dept. of Fish and Wildlife; Confederated Tribes and Bands of the Yakama Nation, Washington.

    1996-01-01

    BPA proposes to fund several fishery-related activities in the Yakima River Basin. These activities, known as the Yakima Fisheries Project (YFP), would be jointly managed by the State of Washington and the Yakima Indian Nation. The YFP is included in the Northwest Power Planning Council`s (Council`s) fish and wildlife program. The Council selected the Yakima River system for attention because fisheries resources are severely reduced from historical levels and because there is a significant potential for enhancement of these resources. BPA`s proposed action is to fund (1) information gathering on the implementation of supplementation techniques and on feasibility of reintroducing coho salmon in an environment where native populations have become extinct; (2) research activities based on continuous assessment, feedback and improvement of research design and activities ({open_quotes}adaptive management{close_quotes}); and (3) die construction, operation, and maintenance of facilities for supplementing populations of upper Yakima spring chinook salmon. Examined in addition to No Action are two alternatives for action: (1) supplementation of depressed natural populations of upper Yakima spring chinook and (2) that same supplementation plus a study to determine the feasibility of reestablishing naturally spawning population and a significant fall fishery for coho in the Yakima Basin. Alternative 2 is the preferred action. A central hatchery would be built for either alternative, as well as three sites with six raceways each for acclimation and release of spring chinook smolts. Major issues examined in the Revised Draft EIS include potential impacts of the project on genetic and ecological resources of existing fish populations, on water quality and quantity, on threatened and endangered species listed under the Endangered Species Act, and on the recreational fishery.

  11. 75 FR 26272 - Final Environmental Impact Statement; Environmental Education Center, Yosemite National Park...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-11

    ... National Park Service Final Environmental Impact Statement; Environmental Education Center, Yosemite... Environmental Impact Statement for development of a new environmental education center in Yosemite National Park... practical the NPS will begin to implement development of a new environmental education center at Henness...

  12. Final environmental impact statement for the Galileo Mission (Tier 2)

    NASA Technical Reports Server (NTRS)

    1989-01-01

    This Final Environmental Impact Statement (FEIS) addresses the proposed action of completing the preparation and operation of the Galileo spacecraft, including its planned launch on the Space Transportation System (STS) Shuttle in October 1989, and the alternative of canceling further work on the mission. The only expected environmental effects of the proposed action are associated with normal launch vehicle operation, and are treated in published National Environmental Policy Act (NEPA) documents on the Shuttle (NASA 1978) and the Kennedy Space Center (NASA 1979), and in the KSC Environmental Resources Document (NASA 1986) and the Galileo Tier 1 EIS (NASA 1988a). The environmental impacts of a normal launch were deemed insufficient to preclude Shuttle operations. Environmental impacts may also result from launch or mission accidents that could release plutonium fuel used in the Galileo power system. Intensive analysis of the possible accidents associated with the proposed action reveal small health or environmental risks. There are no environmental impacts in the no-action alternative. The remote possibility of environmental impacts of the proposed action must be weighed against the large adverse fiscal and programmatic impacts inherent in the no-action alternative.

  13. 78 FR 47048 - Notice of Availability of Final Environmental Impact Statement (Final EIS)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-02

    ... Federal Aviation Administration Notice of Availability of Final Environmental Impact Statement (Final EIS... accordance with the National Environmental Policy Act of 1969 (NEPA, 42 U.S.C. 4321 et seq.) and Council on Environmental Quality regulations (40 CFR Part 1500-1508), the Federal Aviation Administration (FAA) is...

  14. Telephone Flat Geothermal Development Project Environmental Impact Statement Environmental Impact Report. Final

    SciTech Connect

    1999-02-01

    This Final Environmental Impact Statement and Environmental Impact Report (Final EIS/EIR) has been prepared to meet the requirements of the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA). The Proposed Action includes the construction, operation, and decommissioning of a 48 megawatt (gross) geothermal power plant with ancillary facilities (10-12 production well pads and 3-5 injection well pads, production and injection pipelines), access roads, and a 230-kilovolt (kV) transmission line in the Modoc National Forest in Siskiyou County, California. Alternative locations for the power plant site within a reasonable distance of the middle of the wellfield were determined to be technically feasible. Three power plant site alternatives are evaluated in the Final EIS/EIR.

  15. 77 FR 23802 - Notice of Availability of a Final Environmental Impact Report/Environmental Impact Statement, a...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-20

    ... TRANSPORTATION Federal Railroad Administration Notice of Availability of a Final Environmental Impact Report/ Environmental Impact Statement, a Final Section 4(f) Evaluation, and a Draft General Conformity Determination... this notice to advise the public that FRA is issuing a Final Environmental Impact Statement (EIS)...

  16. Exxon Valdez oil spill restoration plan. Final environmental impact statement

    SciTech Connect

    1994-09-01

    The purpose of the proposed action analyzed in this final environmental impact statement (FEIS) is to restore, insofar as possible, the injured natural resources and thereby the services they provide that were affected by the Exxon Valdex oil spill (EVOS). The purpose of this document is to analyze the effects of proposed uses of the remaining funds (approximately $620 million as of February 1994, after final reimbursements) in accomplishing the mission of the Trustee Council.

  17. 76 FR 8808 - Supplemental Final Environmental Impact Statement: Clark County, Indiana, and Jefferson County, KY

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-15

    ... Federal Highway Administration Supplemental Final Environmental Impact Statement: Clark County, Indiana.... SUMMARY: The FHWA is issuing this notice to advise the public that a supplemental environmental impact... elements and using innovative financing sources, including collecting tolls. A Final Environmental Impact...

  18. 76 FR 27086 - Final General Management Plan, Wilderness Management Plan, and Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-10

    ... National Park Service Final General Management Plan, Wilderness Management Plan, and Final Environmental Impact Statement; Apostle Islands National Lakeshore AGENCY: National Park Service, Department of the... 102(2)(C) of the National Environmental Policy Act of 1969 (42 U.S.C. 4332(2)(C)), the National Park...

  19. 10 CFR 51.94 - Requirement to consider final environmental impact statement.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Requirement to consider final environmental impact...-Regulations Implementing Section 102(2) Final Environmental Impact Statements-General Requirements § 51.94 Requirement to consider final environmental impact statement. The final environmental impact statement...

  20. 10 CFR 51.91 - Final environmental impact statement-contents.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Final environmental impact statement-contents. 51.91... Implementing Section 102(2) Final Environmental Impact Statements-General Requirements § 51.91 Final environmental impact statement—contents. (a)(1) The final environmental impact statement will include responses...

  1. 10 CFR 51.94 - Requirement to consider final environmental impact statement.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...-Regulations Implementing Section 102(2) Final Environmental Impact Statements-General Requirements § 51.94 Requirement to consider final environmental impact statement. The final environmental impact statement... appropriate adjudicatory or rulemaking proceeding. final environmental impact statements—production and...

  2. 10 CFR 51.94 - Requirement to consider final environmental impact statement.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...-Regulations Implementing Section 102(2) Final Environmental Impact Statements-General Requirements § 51.94 Requirement to consider final environmental impact statement. The final environmental impact statement... appropriate adjudicatory or rulemaking proceeding. final environmental impact statements—production and...

  3. 10 CFR 51.94 - Requirement to consider final environmental impact statement.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...-Regulations Implementing Section 102(2) Final Environmental Impact Statements-General Requirements § 51.94 Requirement to consider final environmental impact statement. The final environmental impact statement... appropriate adjudicatory or rulemaking proceeding. final environmental impact statements—production and...

  4. 10 CFR 51.94 - Requirement to consider final environmental impact statement.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...-Regulations Implementing Section 102(2) Final Environmental Impact Statements-General Requirements § 51.94 Requirement to consider final environmental impact statement. The final environmental impact statement... appropriate adjudicatory or rulemaking proceeding. final environmental impact statements—production and...

  5. Initial Northwest Power Act Power Sales Contracts : Final Environmental Impact Statement. Volume 1, Environmental Analysis.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-01-01

    This is volume 1 of the final environmental impact statement of the Bonneville Power Administration Information is included on the following: Purpose of and need for action; alternatives including the proposed action; affected environment; and environmental consequences.

  6. Final Tier 2 Environmental Impact Statement for International Space Station

    NASA Technical Reports Server (NTRS)

    1996-01-01

    The Final Tier 2 Environmental Impact Statement (EIS) for the International Space Station (ISS) has been prepared by the National Aeronautics and Space Administration (NASA) and follows NASA's Record of Decision on the Final Tier 1 EIS for the Space Station Freedom. The Tier 2 EIS provides an updated evaluation of the environmental impacts associated with the alternatives considered: the Proposed Action and the No-Action alternative. The Proposed Action is to continue U.S. participation in the assembly and operation of ISS. The No-Action alternative would cancel NASA!s participation in the Space Station Program. ISS is an international cooperative venture between NASA, the Canadian Space Agency, the European Space Agency, the Science and Technology Agency of Japan, the Russian Space Agency, and the Italian Space Agency. The purpose of the NASA action would be to further develop human presence in space; to meet scientific, technological, and commercial research needs; and to foster international cooperation.

  7. 10 CFR 51.118 - Final environmental impact statement-notice of availability.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Final environmental impact statement-notice of... environmental impact statement—notice of availability. (a) Upon completion of a final environmental impact statement or any supplement to a final environmental impact statement, the appropriate NRC staff director...

  8. 10 CFR 51.118 - Final environmental impact statement-notice of availability.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Final environmental impact statement-notice of... environmental impact statement—notice of availability. (a) Upon completion of a final environmental impact statement or any supplement to a final environmental impact statement, the appropriate NRC staff director...

  9. 10 CFR 51.118 - Final environmental impact statement-notice of availability.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Final environmental impact statement-notice of... environmental impact statement—notice of availability. (a) Upon completion of a final environmental impact statement or any supplement to a final environmental impact statement, the appropriate NRC staff director...

  10. 49 CFR 520.28 - Preparation of final environmental impact statements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... ENVIRONMENTAL IMPACTS Procedures § 520.28 Preparation of final environmental impact statements. (a) If the... for the action shall prepare a final environmental impact statement (FEIS), taking into account all... 49 Transportation 6 2013-10-01 2013-10-01 false Preparation of final environmental impact...

  11. 49 CFR 520.28 - Preparation of final environmental impact statements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... ENVIRONMENTAL IMPACTS Procedures § 520.28 Preparation of final environmental impact statements. (a) If the... for the action shall prepare a final environmental impact statement (FEIS), taking into account all... 49 Transportation 6 2012-10-01 2012-10-01 false Preparation of final environmental impact...

  12. 49 CFR 520.28 - Preparation of final environmental impact statements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... ENVIRONMENTAL IMPACTS Procedures § 520.28 Preparation of final environmental impact statements. (a) If the... for the action shall prepare a final environmental impact statement (FEIS), taking into account all... 49 Transportation 6 2014-10-01 2014-10-01 false Preparation of final environmental impact...

  13. 10 CFR 51.118 - Final environmental impact statement-notice of availability.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Final environmental impact statement-notice of... environmental impact statement—notice of availability. (a) Upon completion of a final environmental impact statement or any supplement to a final environmental impact statement, the appropriate NRC staff director...

  14. 10 CFR 51.118 - Final environmental impact statement-notice of availability.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Final environmental impact statement-notice of... environmental impact statement—notice of availability. (a) Upon completion of a final environmental impact statement or any supplement to a final environmental impact statement, the appropriate NRC staff director...

  15. 49 CFR 520.28 - Preparation of final environmental impact statements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 6 2010-10-01 2010-10-01 false Preparation of final environmental impact... ENVIRONMENTAL IMPACTS Procedures § 520.28 Preparation of final environmental impact statements. (a) If the... for the action shall prepare a final environmental impact statement (FEIS), taking into account all...

  16. 49 CFR 520.28 - Preparation of final environmental impact statements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 6 2011-10-01 2011-10-01 false Preparation of final environmental impact... ENVIRONMENTAL IMPACTS Procedures § 520.28 Preparation of final environmental impact statements. (a) If the... for the action shall prepare a final environmental impact statement (FEIS), taking into account all...

  17. Telephone Flat Geothermal Development Project Environmental Impact Statement Environmental Impact Report. Final: Comments and Responses to Comments

    SciTech Connect

    1999-02-01

    This document is the Comments and Responses to Comments volume of the Final Environmental Impact Statement and Environmental Impact Report prepared for the proposed Telephone Flat Geothermal Development Project (Final EIS/EIR). This volume of the Final EIS/EIR provides copies of the written comments received on the Draft EIS/EIR and the leady agency responses to those comments in conformance with the requirements of the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA).

  18. Advanced Mixed Waste Treatment Project (AMWTP) Final Environmental Impact Statement

    SciTech Connect

    1999-02-12

    The AMWTP Final EIS assesses the potential environmental impacts associated with alternatives related to the construction and operation of a proposed waste treatment facility at the INEEL. The alternatives analyzed were: the No Action Alternative, the Proposed Action, the Non-Thermal Treatment Alternative, and the Treatment and Storage Alternative. The Proposed Action is the Preferred Alternative. Under the Proposed Action/Preferred Alternative, the AMWTP facility would treat transuranic waste, alpha-contaminated low-level mixed waste, and low-level mixed waste in preparation for disposal. After treatment, transuranic waste would be disposed of at the Waste Isolation Pilot Plant in New Mexico. Low-level mixed waste would be disposed of at an approved disposal facility depending on decisions to be based on DOE's Final Waste Management Programmatic Environmental Impact Statement. Evaluation of impacts on land use, socioeconomics, cultural resources, aesthetic and scenic resources, geology, air resources, water resources, ecological resources, noise, traffic and transportation, occupational and public health and safety, INEEL services, and environmental justice were included in the assessment.

  19. 75 FR 80068 - Notice of Availability of the Final Environmental Impact Report/Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-21

    ... paper copies may also be obtained by contacting George Meckfessel at (760) 326-7000 or by e- mailing... action alternatives, the Final EIR/EIS analyzes six additional action alternatives that address alternative routes for the transmission and telecommunications lines. As proposed, the transmission line has...

  20. 49 CFR 520.29 - Internal review of final environmental impact statements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... ENVIRONMENTAL IMPACTS Procedures § 520.29 Internal review of final environmental impact statements. (a) Upon... 49 Transportation 6 2013-10-01 2013-10-01 false Internal review of final environmental impact... office originating the action, the final environmental statement shall be accompanied by a brief cover...

  1. 49 CFR 520.29 - Internal review of final environmental impact statements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... ENVIRONMENTAL IMPACTS Procedures § 520.29 Internal review of final environmental impact statements. (a) Upon... 49 Transportation 6 2012-10-01 2012-10-01 false Internal review of final environmental impact... office originating the action, the final environmental statement shall be accompanied by a brief cover...

  2. 49 CFR 520.29 - Internal review of final environmental impact statements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... ENVIRONMENTAL IMPACTS Procedures § 520.29 Internal review of final environmental impact statements. (a) Upon... 49 Transportation 6 2014-10-01 2014-10-01 false Internal review of final environmental impact... office originating the action, the final environmental statement shall be accompanied by a brief cover...

  3. Final Environmental Impact Statement for the Ulysses Mission (Tier 2)

    NASA Technical Reports Server (NTRS)

    1990-01-01

    This Final (Tier 2) Environmental Impact Statement (FEIS) addresses the environmental impacts which may be caused by implementation of the Ulysses mission, a space flight mission to observe the polar regions of the Sun. The proposed action is completion of preparation and operation of the Ulysses spacecraft, including its planned launch at the earliest available launch opportunity on the Space Transportation System (STS) Shuttle in October 1990 or in the backup opportunity in November 1991. The alternative is canceling further work on the mission. The Tier 1 EIS included a delay alternative which considered the Titan 4 launch vehicle as an alternative booster stage for launch in 1991 or later. This alternative was further evaluated and eliminated from consideration when, in November 1988, the U.S. Air Force, which procures the Titan 4, notified that it could not provide a Titan 4 vehicle for the 1991 launch opportunity because of high priority Department of Defense requirements. The Titan 4 launch vehicle is no longer a feasible alternative to the STS/Inertial Upper Stage (IUS)/Payload Assist Module-Special (PAM-S) for the November 1991 launch opportunity. The only expected environment effects of the proposed action are associated with normal launch vehicle operation and are treated elsewhere. The environmental impacts of normal Shuttle launches were addressed in existing NEPA documentation and are briefly summarized. These impacts are limited largely to the near-field at the launch pad, except for temporary stratospheric ozone effects during launch and occasional sonic boom effects near the landing site. These effects were judged insufficient to preclude Shuttle launches. There could also be environmental impacts associated with the accidental release of radiological material during launch, deployment, or interplanetary trajectory injection of the Ulysses spacecraft. Intensive analysis indicates that the probability of release is small. There are no environmental

  4. 76 FR 58240 - Modoc National Forest, Alturas, CA, Supplemental Information for the Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-20

    ... Forest Service Modoc National Forest, Alturas, CA, Supplemental Information for the Final Environmental Impact Statement (FEIS) Motorized Travel Management AGENCY: Forest Service, USDA. ACTION: Notice of intent to supplement the Modoc National Forest Motorized Travel Management Final Environmental Impact...

  5. 76 FR 6510 - Notice of Availability of the Final Environmental Impact Statement (FEIS) for the Airfield...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-04

    ... Federal Aviation Administration Notice of Availability of the Final Environmental Impact Statement (FEIS) for the Airfield Improvement Program at Palm Beach International Airport, West Palm Beach, FL AGENCY... of the Final Environmental Impact Statement. Location of Proposed Action: The Palm...

  6. 76 FR 42762 - Final Written Re-Evaluation for Environmental Impact Statement: Sikorsky Memorial Airport...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-19

    ... Final Environmental Impact Statement (FEIS) has been completed for Sikorsky Memorial Airport in... Federal Aviation Administration Final Written Re-Evaluation for Environmental Impact Statement: Sikorsky Memorial Airport, Stratford, CT AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice...

  7. 78 FR 7450 - Final Environmental Impact Statement for Protecting and Restoring Native Ecosystems by Managing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-01

    ... National Park Service Final Environmental Impact Statement for Protecting and Restoring Native Ecosystems... a Final Environmental Impact Statement for Protecting and Restoring Native Ecosystems by Managing... a manner that supports long-term ecosystem protection, supports natural ecosystem recovery and...

  8. Final environmental impact statement. Waste Isolation Pilot Plant

    SciTech Connect

    Not Available

    1980-10-01

    This volume contains the appendices for the Final Environmental Impact Statement for the Waste Isolation Pilot Plant (WIPP). Alternative geologic environs are considered. Salt, crystalline rock, argillaceous rock, and tuff are discussed. Studies on alternate geologic regions for the siting of WIPP are reviewed. President Carter's message to Congress on the management of radioactive wastes and the findings and recommendations of the interagency review group on nuclear waste management are included. Selection criteria for the WIPP site including geologic, hydrologic, tectonic, physicochemical compatability, and socio-economic factors are presented. A description of the waste types and the waste processing procedures are given. Methods used to calculate radiation doses from radionuclide releases during operation are presented. A complete description of the Los Medanos site, including archaeological and historic aspects is included. Environmental monitoring programs and long-term safety analysis program are described. (DMC)

  9. 10 CFR 51.91 - Final environmental impact statement-contents.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... applicable environmental laws and policies. (d) The final environmental impact statement will include a final... 10 Energy 2 2014-01-01 2014-01-01 false Final environmental impact statement-contents. 51.91 Section 51.91 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS...

  10. 10 CFR 51.91 - Final environmental impact statement-contents.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... applicable environmental laws and policies. (d) The final environmental impact statement will include a final... 10 Energy 2 2011-01-01 2011-01-01 false Final environmental impact statement-contents. 51.91 Section 51.91 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS...

  11. 10 CFR 51.91 - Final environmental impact statement-contents.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... applicable environmental laws and policies. (d) The final environmental impact statement will include a final... 10 Energy 2 2013-01-01 2013-01-01 false Final environmental impact statement-contents. 51.91 Section 51.91 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS...

  12. 10 CFR 51.90 - Final environmental impact statement-general.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Final environmental impact statement-general. 51.90... Implementing Section 102(2) Final Environmental Impact Statements-General Requirements § 51.90 Final environmental impact statement—general. After receipt and consideration of comments requested pursuant to §§ 51...

  13. 76 FR 68503 - Winter Use Plan, Final Environmental Impact Statement, Yellowstone National Park, Idaho, Montana...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-04

    ... National Park Service Winter Use Plan, Final Environmental Impact Statement, Yellowstone National Park... the Final Environmental Impact Statement for the Winter Use Plan, Yellowstone National Park. SUMMARY... availability of a Final Environmental Impact Statement (EIS) for a Winter Use Plan for Yellowstone...

  14. 10 CFR 51.90 - Final environmental impact statement-general.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Final environmental impact statement-general. 51.90... Implementing Section 102(2) Final Environmental Impact Statements-General Requirements § 51.90 Final environmental impact statement—general. After receipt and consideration of comments requested pursuant to §§ 51...

  15. 10 CFR 51.90 - Final environmental impact statement-general.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Final environmental impact statement-general. 51.90... Implementing Section 102(2) Final Environmental Impact Statements-General Requirements § 51.90 Final environmental impact statement—general. After receipt and consideration of comments requested pursuant to §§ 51...

  16. 10 CFR 51.90 - Final environmental impact statement-general.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Final environmental impact statement-general. 51.90... Implementing Section 102(2) Final Environmental Impact Statements-General Requirements § 51.90 Final environmental impact statement—general. After receipt and consideration of comments requested pursuant to §§ 51...

  17. 10 CFR 51.90 - Final environmental impact statement-general.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Final environmental impact statement-general. 51.90... Implementing Section 102(2) Final Environmental Impact Statements-General Requirements § 51.90 Final environmental impact statement—general. After receipt and consideration of comments requested pursuant to §§ 51...

  18. 75 FR 1359 - Notice of Availability of Final Environmental Impact Statement for the Proposed Construction of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-11

    ... Web version of the Final Environmental Impact Statement had problems with the Web links. The web... Department of the Army; Corps of Engineers Notice of Availability of Final Environmental Impact Statement for...: Notice; extension of comment period. SUMMARY: The comment period for the Final Environmental Impact...

  19. 76 FR 67020 - Notice of Availability of the Final Environmental Impact Statement: Los Angeles County, CA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-28

    ... the Final Environmental Impact Statement. SUMMARY: The FHWA, on behalf of the California Department of Transportation (Caltrans), announces the availability of the Final Environmental Impact Statement for the 6th... Federal Highway Administration Notice of Availability of the Final Environmental Impact Statement: Los...

  20. 75 FR 7522 - United States Section; Notice of Availability of the Final Environmental Impact Statement, Flood...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-19

    ... Environmental Impact Statement, Flood Control Improvements and Partial Levee Relocation, Presidio Flood Control...). ACTION: Notice of Availability of Final Environmental Impact Statement. SUMMARY: Pursuant to section 102..., International Boundary and Water Commission (USIBWC) has prepared a Final Environmental Impact Statement (Final...

  1. 76 FR 12342 - Notice of Availability of Record of Decision for the Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-07

    ... Department of the Navy Notice of Availability of Record of Decision for the Final Environmental Impact Statement/Overseas Environmental Impact Statement for Gulf of Mexico Range Complex AGENCY: Department of the... Environmental Impact Statement (EIS)/Overseas Environmental Impact Statement (OEIS) as the Preferred...

  2. 49 CFR 520.30 - Availability of final environmental impact statements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... ENVIRONMENTAL IMPACTS Procedures § 520.30 Availability of final environmental impact statements. (a) Pending... 49 Transportation 6 2013-10-01 2013-10-01 false Availability of final environmental impact statements. 520.30 Section 520.30 Transportation Other Regulations Relating to Transportation (Continued...

  3. 49 CFR 520.30 - Availability of final environmental impact statements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... ENVIRONMENTAL IMPACTS Procedures § 520.30 Availability of final environmental impact statements. (a) Pending... 49 Transportation 6 2012-10-01 2012-10-01 false Availability of final environmental impact statements. 520.30 Section 520.30 Transportation Other Regulations Relating to Transportation (Continued...

  4. 49 CFR 520.30 - Availability of final environmental impact statements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... ENVIRONMENTAL IMPACTS Procedures § 520.30 Availability of final environmental impact statements. (a) Pending... 49 Transportation 6 2014-10-01 2014-10-01 false Availability of final environmental impact statements. 520.30 Section 520.30 Transportation Other Regulations Relating to Transportation (Continued...

  5. 49 CFR 520.30 - Availability of final environmental impact statements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 6 2010-10-01 2010-10-01 false Availability of final environmental impact statements. 520.30 Section 520.30 Transportation Other Regulations Relating to Transportation (Continued... ENVIRONMENTAL IMPACTS Procedures § 520.30 Availability of final environmental impact statements. (a) Pending...

  6. 49 CFR 520.29 - Internal review of final environmental impact statements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 6 2011-10-01 2011-10-01 false Internal review of final environmental impact statements. 520.29 Section 520.29 Transportation Other Regulations Relating to Transportation (Continued... ENVIRONMENTAL IMPACTS Procedures § 520.29 Internal review of final environmental impact statements. (a) Upon...

  7. 49 CFR 520.30 - Availability of final environmental impact statements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 6 2011-10-01 2011-10-01 false Availability of final environmental impact statements. 520.30 Section 520.30 Transportation Other Regulations Relating to Transportation (Continued... ENVIRONMENTAL IMPACTS Procedures § 520.30 Availability of final environmental impact statements. (a) Pending...

  8. 49 CFR 520.29 - Internal review of final environmental impact statements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 6 2010-10-01 2010-10-01 false Internal review of final environmental impact statements. 520.29 Section 520.29 Transportation Other Regulations Relating to Transportation (Continued... ENVIRONMENTAL IMPACTS Procedures § 520.29 Internal review of final environmental impact statements. (a) Upon...

  9. Environmental impacts of proposed Monitored Retrievable Storage. Final report

    SciTech Connect

    Not Available

    1985-12-17

    This report describes environmental impacts from a proposed monitored retrievable storage facility for spent fuels to be located in Tennessee. Areas investigated include: water supply, ground water, air quality, solid waste management, and health hazards. (CBS)

  10. 77 FR 31326 - Notice of Availability of a Final Supplemental Environmental Impact Statement for Replacement of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-25

    ... Supplemental Environmental Impact Statement for Replacement of NOAA National Marine Fisheries Service Southwest... and Atmospheric Administration (NOAA), Commerce. ACTION: Notice of availability of the Final Supplemental Environmental Impact Statement (SEIS); Opportunity for comments. SUMMARY: NOAA announces...

  11. 2006 Long Range Development Plan Final Environmental ImpactReport

    SciTech Connect

    Philliber, Jeff

    2007-01-22

    This environmental impact report (EIR) has been prepared pursuant to the applicable provisions of the California Environmental Quality Act (CEQA) and its implementing guidelines (CEQA Guidelines), and the Amended University of California Procedures for Implementation of the California Environmental Quality Act (UC CEQA Procedures). The University of California (UC or the University) is the lead agency for this EIR, which examines the overall effects of implementation of the proposed 2006 Long Range Development Plan (LRDP; also referred to herein as the 'project' for purposes of CEQA) for Lawrence Berkeley National Laboratory (LBNL; also referred to as 'Berkeley Lab,' 'the Laboratory,' or 'the Lab' in this document). An LRDP is a land use plan that guides overall development of a site. The Lab serves as a special research campus operated by the University employees, but it is owned and financed by the federal government and as such it is distinct from the UC-owned Berkeley Campus. As a campus operated by the University of California, the Laboratory is required to prepare an EIR for an LRDP when one is prepared or updated pursuant to Public Resources Code Section 21080.09. The adoption of an LRDP does not constitute a commitment to, or final decision to implement, any specific project, construction schedule, or funding priority. Rather, the proposed 2006 LRDP describes an entire development program of approximately 980,000 gross square feet of new research and support space construction and 320,000 gross square feet of demolition of existing facilities, for a total of approximately 660,000 gross square feet of net new occupiable space for the site through 2025. Specific projects will undergo CEQA review at the time proposed to determine what, if any, additional review is necessary prior to approval. As described in Section 1.4.2, below, and in Chapter 3 of this EIR (the Project Description), the size of the project has been reduced since the Notice of Preparation for

  12. Final Environmental Impact Statement for the Galileo Mission (Tier 2)

    NASA Technical Reports Server (NTRS)

    1989-01-01

    This Final Environmental Impact Statement (FEIS) addresses the proposed action of completing the preparation and operation of the Galileo spacecraft, including its planned launch on the Space Transportation System (STS) Shuttle in October 1989, and the alternative of canceling further work on the mission. The Tier 1 (program level) EIS (NASA 1988a) considered the Titan IV launch vehicle as an alternative booster stage for launch in May 1991 or later. The May 1991 Venus launch opportunity is considered a planetary back-up for the Magellan (Venus Radar Mapper) mission, the Galileo mission, and the Ulysses mission. Plans were underway to enable the use of a Titan IV launch vehicle for the planetary back-up. However, in November 1988, the U.S. Air Force, which procures the Titan IV for NASA, notified NASA that it could not provide a Titan IV vehicle for the May 1991 launch opportunity due to high priority Department of Defense requirements. Consequently, NASA terminated all mission planning for the Titan IV planetary back-up. A minimum of 3 years is required to implement mission-specific modifications to the basic Titan IV launch configuration; therefore, insufficient time is available to use a Titan IV vehicle in May 1991. Thus, the Titan IV launch vehicle is no longer a feasible alternative to the STS/Inertial Upper Stage (IUS) for the May 1991 launch opportunity.

  13. 47 CFR 1.1317 - The Final Environmental Impact Statement (FEIS).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false The Final Environmental Impact Statement (FEIS... PROCEDURE Procedures Implementing the National Environmental Policy Act of 1969 § 1.1317 The Final Environmental Impact Statement (FEIS). (a) After receipt of comments and reply comments, the Bureau will prepare...

  14. 47 CFR 1.1317 - The Final Environmental Impact Statement (FEIS).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 1 2012-10-01 2012-10-01 false The Final Environmental Impact Statement (FEIS... PROCEDURE Grants by Random Selection Procedures Implementing the National Environmental Policy Act of 1969 § 1.1317 The Final Environmental Impact Statement (FEIS). (a) After receipt of comments and reply...

  15. 47 CFR 1.1317 - The Final Environmental Impact Statement (FEIS).

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 1 2013-10-01 2013-10-01 false The Final Environmental Impact Statement (FEIS... PROCEDURE Grants by Random Selection Procedures Implementing the National Environmental Policy Act of 1969 § 1.1317 The Final Environmental Impact Statement (FEIS). (a) After receipt of comments and reply...

  16. 47 CFR 1.1317 - The Final Environmental Impact Statement (FEIS).

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 1 2014-10-01 2014-10-01 false The Final Environmental Impact Statement (FEIS... PROCEDURE Grants by Random Selection Procedures Implementing the National Environmental Policy Act of 1969 § 1.1317 The Final Environmental Impact Statement (FEIS). (a) After receipt of comments and reply...

  17. 47 CFR 1.1317 - The Final Environmental Impact Statement (FEIS).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 1 2011-10-01 2011-10-01 false The Final Environmental Impact Statement (FEIS... PROCEDURE Procedures Implementing the National Environmental Policy Act of 1969 § 1.1317 The Final Environmental Impact Statement (FEIS). (a) After receipt of comments and reply comments, the Bureau will prepare...

  18. 75 FR 61173 - Jackson Hole Airport Agreement Extension, Final Environmental Impact Statement, Grand Teton...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-04

    ... National Park Service Jackson Hole Airport Agreement Extension, Final Environmental Impact Statement, Grand... of Availability of the Final Environmental Impact Statement for the Jackson Hole Airport Agreement Extension, Grand Teton National Park. SUMMARY: Pursuant to the National Environmental Policy Act of 1969,...

  19. 75 FR 65558 - Final Supplemental Environmental Impact Statement, Single Nuclear Unit at the Bellefonte Plant...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-25

    ... Final Supplemental Environmental Impact Statement, Single Nuclear Unit at the Bellefonte Plant Site... published a record of decision (ROD) for the Final Supplemental Environmental Impact Statement for a Single... the extensive environmental information and analyses that exist respecting the Bellefonte site and the...

  20. 75 FR 15457 - Notice of Availability of Final Elk Management Plan and Environmental Impact Statement for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-29

    ... National Park Service Notice of Availability of Final Elk Management Plan and Environmental Impact... the availability of a Final Elk Management Plan and Environmental Impact Statement (Plan/EIS) for... ); click on the link to Elk Management Plan/ EIS. You may also obtain a copy of the final Plan/EIS...

  1. 76 FR 21403 - Notice of Availability of the Final Environmental Impact Statement for the Genesis Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-15

    ... Final Environmental Impact Statement (EIS) for the Newmont Mining Corporation's proposed Genesis Project...] Notice of Availability of the Final Environmental Impact Statement for the Genesis Project, Eureka County... its notice in the Federal Register. ADDRESSES: Printed copies of the Genesis Project Final EIS are...

  2. 78 FR 285 - Supplemental Final Environmental Impact Statement for Healy Power Generation Unit #2, Healy, AK

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-03

    ... prepare a supplemental final environmental impact statement (SFEIS) to update information in the... Impact Statement for Healy Power Generation Unit 2, Healy, AK AGENCY: Rural Utilities Service, USDA. ACTION: Notice of Intent to Prepare a Supplemental Final Environmental Impact Statement. SUMMARY:...

  3. 76 FR 24050 - Coral Reef Restoration Plan, Final Programmatic Environmental Impact Statement, Biscayne National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-29

    ... National Park Service Coral Reef Restoration Plan, Final Programmatic Environmental Impact Statement... Final Programmatic Environmental Impact Statement for the Coral Reef Restoration Plan, Biscayne National... Impact Statement for the Coral Reef Restoration Plan (Plan/FEIS) for Biscayne National Park, Florida....

  4. 78 FR 59659 - Correction to the Final Environmental Impact Statement/Overseas Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-27

    ... Statement for Hawaii-Southern California Training and Testing AGENCY: Department of the Navy, DoD. ACTION... Statement (EIS)/Overseas EIS (OEIS) for Hawaii- Southern California Training and Testing (HSTT), which was... Environmental Policy Act (NEPA) of 1969. The corrected HSTT Final EIS/ OEIS includes an 11-page Section E.5...

  5. 75 FR 25288 - Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-07

    ... Environmental Impact Statement for the Pocatello Field Office, Idaho AGENCY: Bureau of Land Management, Interior... Management (BLM) has prepared a Proposed Resource Management Plan/Final Environmental Impact Statement... clarify proposed management direction and update the analysis of potential environmental impacts, but...

  6. 75 FR 63503 - Notice of Availability of Final Environmental Impact Statement for the Solar Millennium, Amargosa...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-15

    ...] Notice of Availability of Final Environmental Impact Statement for the Solar Millennium, Amargosa Farm Road Solar Power Project, Nye County, NV AGENCY: Bureau of Land Management, Interior. ACTION: Notice of... prepared a Final Environmental Impact Statement (EIS) for the Amargosa Farm Road Solar Power Project, Nye...

  7. 77 FR 11585 - Notice of Availability of the Aspinall Unit Operations Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-27

    ... Bureau of Reclamation Notice of Availability of the Aspinall Unit Operations Final Environmental Impact... Reclamation (Reclamation), the Federal agency responsible for operation of the Aspinall Unit, announces the availability of the final environmental impact statement (FEIS) on proposed Aspinall Unit operations, Gunnison...

  8. 75 FR 72836 - Notice of Availability of Final Environmental Impact Statement for the Tonopah Solar Energy...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-26

    ...: 14X5017] Notice of Availability of Final Environmental Impact Statement for the Tonopah Solar Energy Crescent Dunes Solar Energy Project, Nye County, NV AGENCY: Bureau of Land Management, Interior. ACTION... (BLM) has prepared a Final Environmental Impact Statement (EIS) for the Crescent Dunes Solar Energy...

  9. 76 FR 77249 - Winter Use Plan, Final Environmental Impact Statement Record of Decision, Yellowstone National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-12

    ... National Park Service Winter Use Plan, Final Environmental Impact Statement Record of Decision, Yellowstone... availability of a Record of Decision on the Final Environmental Impact Statement for a Winter Use Plan.../2010 and 2010/2011. Up to 318 commercially guided, best-available-technology snowmobiles and...

  10. 77 FR 15794 - Final Environmental Impact Statement for the Proposed KRoad Moapa Solar Generation Facility...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-16

    ... Bureau of Indian Affairs Final Environmental Impact Statement for the Proposed KRoad Moapa Solar... Agencies, has prepared a Final Environmental Impact Statement (FEIS) for the proposed KRoad Moapa Solar... following Web site: http://projects2.pirnie.com/MoapaSolar/ . Hard copies of the document will be...

  11. 78 FR 32441 - Grand Ditch Breach Restoration, Final Environmental Impact Statement, Rocky Mountain National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-30

    ... National Park Service Grand Ditch Breach Restoration, Final Environmental Impact Statement, Rocky Mountain... Availability of the Final Environmental Impact Statement for the Grand Ditch Breach Restoration, Rocky Mountain... Grand Ditch Breach Restoration, Rocky Mountain National Park, Colorado. DATES: The National Park Service...

  12. 75 FR 75492 - Notice of Availability of the Final Environmental Impact Statement for the One Nevada...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-03

    ...:14X5017] Notice of Availability of the Final Environmental Impact Statement for the One Nevada Transmission Line (ON Line Project) Nevada AGENCY: Bureau of Land Management, Interior. ACTION: Notice of... prepared a Final Environmental Impact Statement (EIS) for the One Nevada Transmission Line (ON Line...

  13. 75 FR 77897 - Long Walk National Historic Trail Feasibility Study, Abbreviated Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-14

    ... National Park Service Long Walk National Historic Trail Feasibility Study, Abbreviated Final Environmental... National Historic Trail Feasibility Study. SUMMARY: Pursuant to the National Environmental Policy Act of... Abbreviated Final Environmental Impact Statement for the Long Walk National Historic Trail Feasibility Study...

  14. 10 CFR 51.91 - Final environmental impact statement-contents.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Final environmental impact statement-contents. 51.91 Section 51.91 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR... environmental impact statement. Responses to comments may include: (i) Modification of alternatives,...

  15. 10 CFR 51.92 - Supplement to the final environmental impact statement.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...; (6) Include an analysis of any environmental issue related to the impacts of construction or... 10 Energy 2 2014-01-01 2014-01-01 false Supplement to the final environmental impact statement. 51.92 Section 51.92 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION...

  16. 10 CFR 51.92 - Supplement to the final environmental impact statement.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...; (6) Include an analysis of any environmental issue related to the impacts of construction or... 10 Energy 2 2011-01-01 2011-01-01 false Supplement to the final environmental impact statement. 51.92 Section 51.92 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION...

  17. 10 CFR 51.92 - Supplement to the final environmental impact statement.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...; (6) Include an analysis of any environmental issue related to the impacts of construction or... 10 Energy 2 2013-01-01 2013-01-01 false Supplement to the final environmental impact statement. 51.92 Section 51.92 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION...

  18. 10 CFR 51.92 - Supplement to the final environmental impact statement.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...; (6) Include an analysis of any environmental issue related to the impacts of construction or... 10 Energy 2 2010-01-01 2010-01-01 false Supplement to the final environmental impact statement. 51.92 Section 51.92 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION...

  19. 75 FR 52967 - Final Environmental Impact Statement and South Florida and Caribbean Parks Exotic Plant...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-30

    ... National Park Service Final Environmental Impact Statement and South Florida and Caribbean Parks Exotic... environmental impact statement for the South Florida and Caribbean Parks Exotic Plant Management Plan. SUMMARY: Pursuant to the National Environmental Policy Act of 1969, 42 U.S.C. 4332(2)(C), and the Council on...

  20. Final environmental impact statement. Waste Isolation Pilot Plant

    SciTech Connect

    Not Available

    1980-10-01

    In accordance with the National Environmental Policy Act (NEPA) of 1969, the US Department of Energy (DOE) has prepared this document as environmental input to future decisions regarding the Waste Isolation Pilot Plant (WIPP), which would include the disposal of transuranic waste, as currently authorized. The alternatives covered in this document are the following: (1) Continue storing transuranic (TRU) waste at the Idaho National Engineering Laboratory (INEL) as it is now or with improved confinement. (2) Proceed with WIPP at the Los Medanos site in southeastern New Mexico, as currently authorized. (3) Dispose of TRU waste in the first available repository for high-level waste. The Los Medanos site would be investigated for its potential suitability as a candidate site. This is administration policy and is the alternative preferred by the DOE. (4) Delay the WIPP to allow other candidate sites to be evaluated for TRU-waste disposal. This environmental impact statement is arranged in the following manner: Chapter 1 is an overall summary of the analysis contained in the document. Chapters 2 and 4 set forth the objectives of the national waste-management program and analyze the full spectrum of reasonable alternatives for meeting these objectives, including the WIPP. Chapter 5 presents the interim waste-acceptance criteria and waste-form alternatives for the WIPP. Chapters 6 through 13 provide a detailed description and environmental analysis of the WIPP repository and its site. Chapter 14 describes the permits and approvals necessary for the WIPP and the interactions that have taken place with Federal, State, and local authorities, and with the general public in connection with the repository. Chapter 15 analyzes the many comments received on the DEIS and tells what has been done in this FEIS in response. The appendices contain data and discussions in support of the material in the text.

  1. Environmental impacts of thermochemical biomass conversion. Final report

    SciTech Connect

    Elliott, D.C.; Hart, T.R.; Neuenschwander, G.G.; McKinney, M.D.; Norton, M.V.; Abrams, C.W.

    1995-06-01

    Thermochemical conversion in this study is limited to fast pyrolysis, upgrading of fast pyrolysis oils, and gasification. Environmental impacts of all types were considered within the project, but primary emphasis was on discharges to the land, air, and water during and after the conversion processes. The project discussed here is divided into five task areas: (1) pyrolysis oil analysis; (2) hydrotreating of pyrolysis oil; (3) gas treatment systems for effluent minimization; (4) strategic analysis of regulatory requirements; and (5) support of the IEA Environmental Systems Activity. The pyrolysis oil task was aimed at understanding the oil contaminants and potential means for their removal. The hydrotreating task was undertaken to better define one potential means for both improving the quality of the oil but also removing contaminants from the oil. Within Task 3, analyses were done to evaluate the results of gasification product treatment systems. Task 4 was a review and collection of regulatory requirements which would be applicable to the subject processes. The IEA support task included input to and participation in the IEA Bioenergy activity which directly relates to the project subject. Each of these tasks is described along with the results. Conclusions and recommendations from the overall project are given.

  2. 75 FR 44977 - General Management Plan/Abbreviated Final Environmental Impact Statement, Roosevelt-Vanderbilt...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-30

    .../Abbreviated Final Environmental Impact Statement, Roosevelt-Vanderbilt National Historic Sites, Hyde Park, NY... National Historic Sites, Hyde Park, NY. SUMMARY: Pursuant to National Environmental Policy Act of 1969, 42... National Historic Sites, Hyde Park, New York. The Abbreviated Final GMP/EIS includes an analysis of agency...

  3. 75 FR 47826 - Final General Management Plan/Environmental Impact Statement, Cumberland Gap National Historical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-09

    ... potential environmental consequences of implementing the preferred alternative. Impact topics include the... National Park Service Final General Management Plan/Environmental Impact Statement, Cumberland Gap National.... ACTION: Notice of Availability. SUMMARY: Pursuant to 42 U.S.C. 4332(2)(C) of the National...

  4. 77 FR 44267 - Notice of Availability of the Final Programmatic Environmental Impact Statement for Solar Energy...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-27

    ... Environmental Impact Statement for Solar Energy Development in Six Southwestern States AGENCY: Bureau of Land... availability of the Final Programmatic Environmental Impact Statement for Solar Energy Development in Six... Programmatic EIS and Proposed RMP Amendments, references, and additional information regarding solar energy...

  5. 78 FR 35314 - Availability of Final Environmental Impact Statement; Bunker Hill Groundwater Basin, Riverside...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-12

    ... reservoir storage tank. The project is intended to improve the reliability of Western's water supply through... Water District have completed a final Supplemental Environmental Impact Report/Environmental Impact... Jefferson Avenue Suite 202, Temecula, California 92590. Western Municipal Water District, 14205...

  6. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix O: Economic and Social Impact.

    SciTech Connect

    Columbia River System Operation Review

    1995-11-01

    This Appendix O of the Final Environmental Impact Statement for the Columbia River System measures the economic and social effects of the alternative system operation strategies and includes both geographic and methodology components. Areas discussed in detail include the following: purpose, scope and process; an economic history of the Columbia River Basin and its use today including the Columbia River and Socio-economic development in the Northwest and Major uses of the River System; Analysis procedures and methodologies including national economic evaluation, the concepts, analysis of assumptions, analysis for specific river uses, water quality, Regional evaluation, analysis, and social impacts; alternatives and impacts including implementation costs, andromous fish, resident fish and wildlife, flood control, irrigation and municipal and industrial water supply, navigation impacts, power, recreation, annual costs, regional economic analysis. Extensive comparison of alternatives is included.

  7. 10 CFR 51.97 - Final environmental impact statement-materials license.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Final environmental impact statement-materials license. 51.97 Section 51.97 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act...

  8. 10 CFR 51.97 - Final environmental impact statement-materials license.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Final environmental impact statement-materials license. 51.97 Section 51.97 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act...

  9. 75 FR 22829 - National Environmental Policy Act; Final Environmental Impact Statement on U.S. Coast Guard...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-30

    ... SECURITY Coast Guard National Environmental Policy Act; Final Environmental Impact Statement on U.S. Coast Guard Pacific Area Operations: Districts 11 and 13 AGENCY: Coast Guard, DHS. ACTION: Notice of availability and request for comments. SUMMARY: The U.S. Coast Guard announces the availability of the Final...

  10. 78 FR 23586 - Final Environmental Impact Statement, Habitat Conservation Plan, and Implementing Agreement and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-19

    ... advising the public of the availability of the Final Environmental Impact Statement (FEIS) associated with... bat (Myotis sodalis) from construction, operation, maintenance, and decommissioning associated with... from the Ecological Services Office in the Midwest Regional Office (see FOR FURTHER INFORMATION...

  11. 64 FR 34266 - Notice of Availability of Proposed Owyhee Resource Management Plan and Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    1999-06-25

    ... Bureau of Land Management Notice of Availability of Proposed Owyhee Resource Management Plan and Final... Resource Management Plan (RMP) and associated final Environmental Impact Statement (EIS) for the Owyhee... the Owyhee Proposed Resource Management Plan, which is Alternative E in the final EIS. The...

  12. 78 FR 760 - Notice of Availability of the Final General Management Plan/Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-04

    ... National Park Service Notice of Availability of the Final General Management Plan/Final Environmental Impact Statement for the Ice Age Complex at Cross Plains, WI AGENCY: National Park Service, Interior. ACTION: Notice of availability. SUMMARY: The National Park Service (NPS) announces the availability...

  13. 76 FR 39072 - Notice of Availability of a Final Environmental Impact Statement and Final Habitat Conservation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-05

    ... 0648-XA439 Notice of Availability of a Final Environmental Impact Statement and Final Habitat... Statement and Habitat Conservation Plan. SUMMARY: The National Marine Fisheries Service (NMFS) and the U.S... also announce the availability of Kent's Clark Springs Water Supply System Habitat Conservation Plan...

  14. 76 FR 81962 - Final Environmental Impact Statement for General Management Plan, Ross Lake National Recreation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-29

    ... of Ross Lake NRA, Goodell Creek, and Newhalem Creek. Climate change impacts and Ross Lake NRA's... evaluating the changes and impacts of the other three alternatives. The emphasis of the No Action Alternative... NATIONAL PARK SERVICE Final Environmental Impact Statement for General Management Plan, Ross Lake...

  15. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix J: Recreation.

    SciTech Connect

    Columbia River System Operation Review

    1995-11-01

    This Appendix J of the Final Environmental Impact Statement for the Columbia River System discusses impacts on the recreational activities in the region. Major sections include the following: scope and processes; recreation in the Columbia River Basin today - by type, location, participation, user characteristics, factors which affect usage, and managing agencies; recreation analysis procedures and methodology; and alternatives and their impacts.

  16. Maiden Wind Farm, Final NEPA/SEPA Environmental Impact Statement

    SciTech Connect

    N /A

    2003-01-03

    BPA's proposed action is the execution of power purchase and construction and generation interconnection agreements to acquire and transmit up to 50 aMW (up to about 200 MW) of output from the proposed Maiden Wind Farm, which would be developed to generate up to 494 MW. Benton and Yakima Counties' proposed action is to grant Conditional Use Permits (CUPs) and other required permits for full build-out of the project, which would require construction of up to 549 wind turbines for a 494-MW project. The EIS evaluates two alternatives--the Proposed Action (which means that part or all of the proposed project would be built) and No Action. BPA would not purchase or transmit power from the project under the No Action Alternative and it is therefore likely that the project would not be constructed. Washington Winds Inc. proposes to construct and operate up to 494 megawatts (MW) of wind generation on privately- and publicly-owned property in Benton and Yakima Counties, Washington. This EIS evaluates the environmental effects of BPA's Proposed Action to execute power purchase and interconnection agreements for the purpose of acquiring up to 50 average megawatts (aMW) (up to about 200 MW) of the project developer's proposed Maiden Wind Farm. The project developer has requested a CUP for up to 494 MW. Although the full 494 MW of power may or may not be constructed, this EIS evaluates impacts from full buildout of the project. The project would be located about 10 miles northeast of Sunnyside in the Rattlesnake Hills and would occupy approximately 251 acres of land. Approximately 1,063 acres would be temporarily occupied during construction by facilities such as staging areas, equipment laydown areas, and rock quarries. Except for portions of two sections of land owned by the Washington Department of Natural Resources (DNR), the project would be constructed on privately-owned farm and ranch land in Benton and Yakima Counties. The major facilities of the project include up to

  17. 60 FR 35577 - Adoption of Final Environmental Impact Statement

    Federal Register 2010, 2011, 2012, 2013, 2014

    1995-07-10

    ... can be inspected by the public at the following places: TVA Corporate Library, East Tower Building, 400 West Summit Hill Drive, Knoxville, Tennessee 37902; TVA Corporate Library, Signal Place, 1101 Market Street, Chattanooga, Tennessee 37402; and TVA Technical Library, A100 National Environmental...

  18. 76 FR 6455 - Final Programmatic Environmental Impact Statement (PEIS) for the Growth, Realignment, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-04

    ... Department of the Army Final Programmatic Environmental Impact Statement (PEIS) for the Growth, Realignment... growth, realignment, and stationing of new and existing Army aviation assets. The proposed action..., indirect, and cumulative environmental effects of proposed CAB growth and realignment for each...

  19. 10 CFR 51.97 - Final environmental impact statement-materials license.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Final environmental impact statement-materials license. 51.97 Section 51.97 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION... enrichment facility. As provided in section 5(e) of the Solar, Wind, Waste, and Geothermal Power Production...

  20. 10 CFR 51.97 - Final environmental impact statement-materials license.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Final environmental impact statement-materials license. 51.97 Section 51.97 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION... enrichment facility. As provided in section 5(e) of the Solar, Wind, Waste, and Geothermal Power Production...

  1. 76 FR 67178 - Wells Hydroelectric Project; Notice of Availability of the Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... Energy Regulatory Commission Wells Hydroelectric Project; Notice of Availability of the Final Environmental Impact Statement for the Wells Hydrolectric Project In accordance with the National Environmental... reviewed the application for license for the Wells Hydroelectric Project (FERC No. 2149), located on...

  2. 78 FR 38072 - General Management Plan, Final Environmental Impact Statement, Guadalupe Mountains National Park...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-25

    ... Environmental Policy Act of 1969, 42 U.S.C. 4332(2)(C), the National Park Service (NPS) announces the availability of a Final Environmental Impact Statement for the General Management Plan, Guadalupe Mountains National Park, Texas. DATES: The NPS will execute a Record of Decision no sooner than 30 days following...

  3. 77 FR 74865 - Notice of Availability of the Final Environmental Impact Statement for the Searchlight Wind...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-18

    ...) has prepared a Final Environmental Impact Statement (EIS) for the Searchlight Wind Energy Project and..., phone 702-515-5173, or email to: BLM_NV_SNDO_SearchlightWindEnergyEIS@blm.gov . Interested persons may.../searchlight_wind_energy.html . Copies of the Final EIS are available for public inspection at the BLM Southern...

  4. Final environmental impact statement for Ames Research Center

    NASA Technical Reports Server (NTRS)

    1971-01-01

    The NASA-Ames Research Center is described. together with the nature of its activities, from which it can be seen that the center is basically not a major pollution source. Geographical, and climatic characteristics of the site are described. inasmuch as they influence both the choice of disposal methods and the environmental effects of the pollutants. The known or probable pollution sources at the center are described. Where the intensities of these sources might exceed the recommended guidelines, the corrective actions that have been taken are described.

  5. 76 FR 75556 - Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-02

    ... Counties in northern New Mexico. This land use plan would replace the 1988 Taos RMP, as amended, and... Environmental Impact Statement for the Taos Field Office, New Mexico AGENCY: Bureau of Land Management, Interior... Impact Statement (Proposed RMP/Final EIS) for the Taos Field Office, New Mexico, and by this Notice...

  6. Exxon Valdez restoration plan. summary of the final environmental impact statement

    SciTech Connect

    1994-09-01

    The Exxon Valdez Trustee Council issued a draft Restoration Plan in November of 1993. The draft Restoration Plan provides long-term guidance for restoring the resources and services injured by the Exxon Valdez Oil Spill of March 24, 1989. This final Environmental Impact Statement (FEIS) analyzes the potential environmental impacts of the draft Restoration Plan as the Proposed Action - Alternative 5, and four other alternatives that provide different policies and emphasis than the proposed action.

  7. Sierra Pacific Power Company Alturas Transmission Line Project, Final Environmental Impact Report/Environmental Impact Statement. Volume 3: Appendices

    SciTech Connect

    1995-11-01

    Sierra Pacific Power Company has proposed the construction and operation of a 345,000 volt overhead electric power transmission line from Alturas, California to Reno, Nevada. This Environmental Impact Report/Environmental Impact Statement will assess the potential environmental impacts of the proposed project and alternatives. This report contains Appendices A--I which contain the following: glossary/abbreviations; scoping report; structure coordinate summary; air quality; biological resources; geology; noise; visual contrast rating forms; and cultural resources.

  8. 75 FR 30055 - Notice of Availability of the Final Environmental Impact Statement for the Graymont Western U.S...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-28

    ... Bureau of Land Management Notice of Availability of the Final Environmental Impact Statement for the... Policy Act of 1969 and the Federal Land Policy and Management Act of 1976, a Final Environmental Impact... Department of Environmental Quality (DEQ). Operations on public lands in the permit area are on mining...

  9. 77 FR 39253 - Final Environmental Impact Statement on the Denali Park Road Vehicle Management Plan, Denali...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-02

    ... offer the largest number of visitors the opportunity to travel the park road. This adaptive management... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF INTERIOR NATIONAL PARK SERVICE Final Environmental Impact Statement on the Denali Park Road Vehicle Management...

  10. 75 FR 19989 - Final Environmental Impact Statement for Drought Management Planning at the Kerr Hydroelectric...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-16

    ... Management Planning at the Kerr Hydroelectric Project, Flathead Lake, Montana, is now available for public... Bureau of Indian Affairs Final Environmental Impact Statement for Drought Management Planning at the Kerr Hydroelectric Project, Flathead Lake, MT AGENCY: Bureau of Indian Affairs, Interior. ACTION: Notice...

  11. 75 FR 49504 - Notice of Availability of Final Environmental Impact Statement for the Goethals Bridge...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-13

    ... SECURITY Coast Guard Notice of Availability of Final Environmental Impact Statement for the Goethals Bridge... Port Authority of New York and New Jersey of the 82-year old Goethals Bridge across the Arthur Kill..., human and cultural environment of the proposed Goethals Bridge Replacement Project. DATES: The review...

  12. 75 FR 52969 - Final Environmental Impact Statement; Prisoners Harbor Wetland Restoration, Santa Cruz Island...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-30

    ... National Park Service Final Environmental Impact Statement; Prisoners Harbor Wetland Restoration, Santa... coastal wetland on Santa Cruz Island, Channel Islands National Park. The requisite no-action ``wait period... restoration of palustrine wetlands and deepwater habitat at Prisoners Harbor, as well as remove a...

  13. 77 FR 67662 - Notice of Availability of the Desert Harvest Solar Project Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-13

    ... Bureau of Land Management Notice of Availability of the Desert Harvest Solar Project Final Environmental Impact Statement, Riverside County, CA and the Proposed California Desert Conservation Area Plan... 1976, as amended, the Bureau of Land Management (BLM) has prepared a Proposed California...

  14. 78 FR 34402 - Final Environmental Impact Statement, Habitat Conservation Plan, and Implementing Agreement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-07

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF THE INTERIOR Fish and Wildlife Service Final Environmental Impact Statement, Habitat Conservation Plan, and...-species habitat conservation plan (MSHCP) to cover a suite of activities associated with operation...

  15. 75 FR 27812 - Final Environmental Impact Statement for the General Management Plan; Monocacy National Battlefield

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-18

    ... local leased space. An alternative transportation system would be implemented. New trails would be...: 2010-11819] DEPARTMENT OF THE INTERIOR National Park Service Final Environmental Impact Statement for the General Management Plan; Monocacy National Battlefield AGENCY: National Park Service, Department...

  16. 76 FR 22734 - South Carolina Electric and Gas; Notice of Availability of the Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-22

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION South Carolina Electric and Gas; Notice of Availability of the Final Environmental Impact Statement for Virgil C. Summer Nuclear Station, Units 2 and 3, Combined Licenses Application Review Notice is hereby given that the U.S. Nuclear Regulatory...

  17. 77 FR 26316 - Progress Energy Florida; Final Environmental Impact Statement for Combined Licenses for Levy...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-03

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Progress Energy Florida; Final Environmental Impact Statement for Combined Licenses for Levy Nuclear Plant Units 1 and 2 Notice is hereby given that the U.S. Nuclear Regulatory Commission (NRC or the Commission) and the U.S. Army Corps of Engineer...

  18. 78 FR 12347 - Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-22

    ... Bureau of Land Management Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact Statement for the Lander Field Office Planning Area, WY AGENCY: Bureau of Land Management... of 1969, as amended, and the Federal Land Policy and Management Act of 1976, as amended, the...

  19. 77 FR 67661 - Notice of Availability of the Final Environmental Impact Statement for the Restoration Design...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-13

    ... final Environmental Impact Statement. On page 65402, column 1, line 59 of the notice, which reads... identifies about 192,100.'' On page 65402, column 2, line 59 of the notice, which reads, ``Alternative 6, with 222,800 acres of,'' is hereby corrected to read, ``Alternative 6, with 192,100 acres of.'' On page...

  20. 75 FR 13264 - Final Environmental Impact Statement (FEIS) for Training Land Acquisition at Fort Polk, LA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-19

    ... Department of the Army Final Environmental Impact Statement (FEIS) for Training Land Acquisition at Fort Polk... acres of commercial and private lands for training in the vicinity of Fort Polk, Louisiana. This Proposed Action to acquire additional lands supports the training requirements of the Joint...

  1. 76 FR 11522 - Nuclear Innovation North America LLC; Notice of Availability of the Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-02

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Nuclear Innovation North America LLC; Notice of Availability of the Final Environmental Impact... Library, located at 1100 7th Street, Bay City, Texas, has also agreed to make the EIS available to...

  2. Final (Tier 1) environmental impact statement for the Galileo and Ulysses Missions

    NASA Technical Reports Server (NTRS)

    1988-01-01

    Presented here is a Final (Tier 1) Environmental Impact Statement (EIS) addressing the potential environmental consequences associated with continuing the modifications of the Galileo and Ulysses spacecraft for launch using a booster/upper stage combination that is different from the one planned for use prior to the Challenger accident, while conducting the detailed safety and environmental analysis in order to preserve the October 1989 launch opportunity for Galileo and an October 1990 launch opportunity for Ulysses. While detailed safety and environmental analyses associated with the missions are underway, they currently are not complete. Nevertheless, sufficient information is available to enable a choice among the reconfiguration alternatives presented. Relevant assessments of the potential for environmental impacts are presented.

  3. Initial Northwest Power Act Power Sales Contracts : Final Environmental Impact Statement. Volume 4, Comments and Responses.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-01-01

    This volume of the Initial Northwest Power Act Power Sales Contracts Final Environmental Impact Statement (Final EIS) contains public comments addressing the Initial Northwest Power Act Power Sales Contracts Draft EIS, August 1990 and Bonneville Power Administration`s (BPA) responses. The Introduction provides information about the process BPA follows in addressing these comments. Part I contains a listing of the Alternative Actions evaluated in the Final EIS; Part II is organized by Alternatives and includes summaries of the comments and BPA responses; Part III provides copies of the original comments letters, and, for ease of identification, are coded in the margins according to the alternative(s) addressed.

  4. Sierra Pacific Power Company Alturas Transmission Line Project. Final environmental impact report/environmental impact statement, Volume I

    SciTech Connect

    1995-11-01

    This Environmental Impact Report/Environmental Impact Statement (EIR/S) describes the environmental setting and consequences of the construction and operation of the proposed Alturas Transmission Line Project. Sierra Pacific Power Company (SPPCo) has proposed this electric power transmission line to improve the existing operational capacity and reliability of its power transmission system and provide for anticipated growth in demand for electric power. This document was prepared by the California Public Utilities Commission (CPUC) and the U.S. Department of the Interior, Bureau of Land Management (BLM), pursuant to the California Environmental Quality Act (CEQA) and the National Environmental Policy Act (NEPA), respectively. The purpose of this joint EIR/S is to report the results of the CPUC`s and BLM`s independent assessment of the potential environmental impacts that would result from the construction, operation, and maintenance of the proposed Alturas Transmission Line Project. The impact analysis is accompanied by the identification of feasible mitigation measures which, if incorporated into the project, would avoid or minimize impacts. This EIR/S also assesses alternatives to the Proposed Project and identifies those with the potential to eliminate or minimize impacts. This document considers comments made by agencies and the general public during the public scoping and Draft EIR/S comment periods.

  5. Supplemental final environmental impact statement for advanced solid rocket motor testing at Stennis Space Center

    NASA Technical Reports Server (NTRS)

    1990-01-01

    Since the Final Environmental Impact Statement (FEIS) and Record of Decision on the FEIS describing the potential impacts to human health and the environment associated with the program, three factors have caused NASA to initiate additional studies regarding these issues. These factors are: (1) The U.S. Army Corps of Engineers and the Environmental Protection Agency (EPA) agreed to use the same comprehensive procedures to identify and delineate wetlands; (2) EPA has given NASA further guidance on how best to simulate the exhaust plume from the Advanced Solid Rocket Motor (ASRM) testing through computer modeling, enabling more realistic analysis of emission impacts; and (3) public concerns have been raised concerning short and long term impacts on human health and the environment from ASRM testing.

  6. 75 FR 358 - Bison Pipeline, L.L.C.; Notice of Availability of the Final Environmental Impact Statement for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-05

    ...] Bison Pipeline, L.L.C.; Notice of Availability of the Final Environmental Impact Statement for the Proposed Bison Pipeline Project December 29, 2009. The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared a final environmental impact statement (EIS) for the Bison...

  7. 77 FR 41878 - Notice of Record of Decision on the Final Environmental Impact Statement that Evaluated the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-16

    ... Federal Aviation Administration Notice of Record of Decision on the Final Environmental Impact Statement that Evaluated the Proposed Airfield Improvement Project at Palm Beach International Airport, Palm... interested parties that it has issued a Record of Decision (ROD) for the Final Environmental Impact...

  8. 77 FR 38375 - Notice of Availability of the Final Environmental Impact Statement (FEIS) for the Taos Regional...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-27

    ... Environmental Impact Statement. Location: The Taos Regional Airport (SKX) is located in north Taos County, New... airport access road; and, extension of an on-airport access road. The FAA published a Draft Environmental... Federal Aviation Administration Notice of Availability of the Final Environmental Impact Statement...

  9. 75 FR 29574 - Final Legislative Environmental Impact Statement for the Harvest of Glaucous-Winged Gull Eggs by...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-26

    ... Environmental Impact Statement for the Harvest of Glaucous-Winged Gull Eggs by the Huna Tlingit in Glacier Bay... Glacier Bay National Park. SUMMARY: The National Park Service (NPS) announces the availability of a final... Tlingit in Glacier Bay National Park. The document describes and analyzes the environmental impacts of...

  10. 77 FR 76067 - Notice of Availability of a Proposed Land Use Plan Amendment and Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-26

    ... Environmental Impact Statement for the Proposed McCoy Solar Energy Project, CA AGENCY: Bureau of Land Management...) plan amendment and final environmental impact statement (EIS) for the McCoy Solar Energy Project... photovoltaic solar energy generation facility and necessary ancillary facilities including a generation tie...

  11. Columbia River System Operation Review : Final Environmental Impact Statement, Main Report Exhibits.

    SciTech Connect

    Columbia River System Operation Review

    1995-11-01

    This Volume is a part of the Final Environmental Impact Statement (EIS) for the Columbia River System. This volume contains technical exhibits of cultural resources and commentary on the (System Operation Review) SOR process. The Confederated Tribes of the Umatilla Indian Reservation comment is the majority of the material in the volume, in the Consultation Plan, Identification of trust resources; Criteria for the selection of a System Operating Strategy; comment on rights protection and implementation of Federal Trust responsibility; analysis of the draft EIS. Comment by other Native American Tribes and groups is also included: Confederated Tribes of the Colville Reservation; Kootenai Tribe of Idaho; Spokane Tribe of Indians; Coeur d` Alene tribe.

  12. Final West Valley Demonstration Project Waste Management Environmental Impact Statement, Cattaraugus County, West Valley, New York

    SciTech Connect

    N /A

    2004-01-16

    The purpose of the ''Final West Valley Demonstration Project Waste Management Environmental Impact Statement'' is to provide information on the environmental impacts of the Department of Energy's proposed action to ship radioactive wastes that are either currently in storage, or that will be generated from operations over the next 10 years, to offsite disposal locations, and to continue its ongoing onsite waste management activities. Decommissioning or long-term stewardship decisions will be reached based on a separate EIS that is being prepared for that decisionmaking. This EIS evaluates the environmental consequences that may result from actions to implement the proposed action, including the impacts to the onsite workers and the offsite public from waste transportation and onsite waste management. The EIS analyzes a no action alternative, under which most wastes would continue to be stored onsite over the next 10 years. It also analyzes an alternative under which certain wastes would be shipped to interim offsite storage locations prior to disposal. The Department's preferred alternative is to ship wastes to offsite disposal locations.

  13. Final Environmental Impact Statement (EIS) for the Space Nuclear Thermal Propulsion (SNTP) program

    NASA Astrophysics Data System (ADS)

    1991-09-01

    A program has been proposed to develop the technology and demonstrate the feasibility of a high-temperature particle bed reactor (PBR) propulsion system to be used to power an advanced second stage nuclear rocket engine. The purpose of this Final Environmental Impact Statement (FEIS) is to assess the potential environmental impacts of component development and testing, construction of ground test facilities, and ground testing. Major issues and goals of the program include the achievement and control of predicted nuclear power levels; the development of materials that can withstand the extremely high operating temperatures and hydrogen flow environments; and the reliable control of cryogenic hydrogen and hot gaseous hydrogen propellant. The testing process is designed to minimize radiation exposure to the environment. Environmental impact and mitigation planning are included for the following areas of concern: (1) Population and economy; (2) Land use and infrastructure; (3) Noise; (4) Cultural resources; (5) Safety (non-nuclear); (6) Waste; (7) Topography; (8) Geology; (9) Seismic activity; (10) Water resources; (11) Meteorology/Air quality; (12) Biological resources; (13) Radiological normal operations; (14) Radiological accidents; (15) Soils; and (16) Wildlife habitats.

  14. Final environmental impact statement/report and 4(f) statement. Volume 1. Northeast corridor improvement project electrification: New Haven, CT to Boston, MA. Final report

    SciTech Connect

    1994-10-31

    This document is the final environmental impact statement and final environmental impact report (FEIS/R) on the proposal by the National Railroad Passenger Corporation (Amtrak) to complete the electrification of the Northeast Corridor main line by extending electric traction from New Haven, CT, to Boston, MA. This document (Volume I) is the main body of the FEIS/R and includes a 4(f) Statement on the proposed location of an electrification facility in the Great Swamp Wildlife Management Area.

  15. Disposal and Reuse of Eaker Air Force Base, Arkansas. Final Environmental Impact Statement

    DTIC Science & Technology

    1992-11-01

    effectiveness in achieving safe and efficient utilization of airspace, (2) assess factors affecting the movement of air traffic, and (3) establish...environmental impacts of airport development must be assessed prior to commitment of federal funding, in accordance with NEPA and FAA Orders 1050.1 D...Policies and Procedures for Considering Environmental Impacts, and 5050.4A, Airport Environmental Handbook. Environmental impacts must be assessed

  16. Zachary-Fort Lauderdale pipeline construction and conversion project: final supplement to final environmental impact statement. Docket No. CP74-192

    SciTech Connect

    1980-05-01

    This Final Supplement to the Final Environmental Impact Statement (Final Supplement) evaluates the economic, engineering, and environmental aspects of newly developed alternatives to an abandonment/conversion project proposed by Florida Gas Transmission Company (Florida Gas). It also updates the staff's previous FEIS and studies revisions to the original proposal. Wherever possible, the staff has adopted portions of its previous FEIS in lieu of reprinting portions of that analysis which require no change. 60 references, 8 figures, 35 tables.

  17. Final Hanford Comprehensive Land-Use Plan Environmental Impact Statement, Hanford Site, Richland, Washington

    SciTech Connect

    N /A

    1999-10-01

    This Final ''Hanford Comprehensive Land-Use Plan Environmental Impact Statement'' (HCP EIS) is being used by the Department of Energy (DOE) and its nine cooperating and consulting agencies to develop a comprehensive land-use plan (CLUP) for the Hanford Site. The DOE will use the Final HCP EIS as a basis for a Record of Decision (ROD) on a CLUP for the Hanford Site. While development of the CLUP will be complete with release of the HCP EIS ROD, full implementation of the CLUP is expected to take at least 50 years. Implementation of the CLUP would begin a more detailed planning process for land-use and facility-use decisions at the Hanford Site. The DOE would use the CLUP to screen proposals. Eventually, management of Hanford Site areas would move toward the CLUP land-use goals. This CLUP process could take more than 50 years to fully achieve the land-use goals.

  18. Johnston Atoll Chemical Agent Disposal System (JACADS) Final Second Supplemental Environmental Impact Statement (SSEIS)

    SciTech Connect

    Not Available

    1990-06-01

    This Final Second Supplemental Environmental Impact Statement (SSEIS) to the Johnston Atoll Chemical Agent Disposal System (JACADS) Environmental Impact Statement (EIS) assesses the effects of receiving, storing, and ultimately destructing the United States stockpile of lethal unitary chemical munitions currently stored in the Federal Republic of Germany (FRG) (European stockpile) at the Army's JACADS facility located on Johnston Atoll in the Pacific Ocean. This Final SSEIS addresses the effects of the following proposed European stockpile activities: the transport of the European stockpile from the territorial limit to Johnston Island, the unloading of munitions from transportation ships, the on-island munitions transport and handling, on-island munitions storage, the disposal of munitions in the JACADS facility, the disposal of incineration wastes, and alternatives to the proposed action. This document also updates information in the 1983 EIS and the 1988 SEIS, as appropriate. This volume contains reproduced letters from various agencies, reproduced written comments received from the public, and a transcript from the public meeting.

  19. Dual axis radiographic hydrodynamic test facility. Final environmental impact statement, Volume 2: Public comments and responses

    SciTech Connect

    1995-08-01

    On May 12, 1995, the U.S. Department of Energy (DOE) issued the draft Dual Axis Radiographic Hydrodynamic Test Facility Environmental Impact Statement (DARHT EIS) for review by the State of New Mexico, Indian Tribes, local governments, other Federal agencies, and the general public. DOE invited comments on the accuracy and adequacy of the draft EIS and any other matters pertaining to their environmental reviews. The formal comment period ran for 45 days, to June 26, 1995, although DOE indicated that late comments would be considered to the extent possible. As part of the public comment process, DOE held two public hearings in Los Alamos and Santa Fe, New Mexico, on May 31 and June 1, 1995. In addition, DOE made the draft classified supplement to the DARHT EIS available for review by appropriately cleared individuals with a need to know the classified information. Reviewers of the classified material included the State of New Mexico, the U.S. Environmental Protection Agency, the Department of Defense, and certain Indian Tribes. Volume 2 of the final DARHT EIS contains three chapters. Chapter 1 includes a collective summary of the comments received and DOE`s response. Chapter 2 contains the full text of the public comments on the draft DARHT EIS received by DOE. Chapter 3 contains DOE`s responses to the public comments and an indication as to how the comments were considered in the final EIS.

  20. Environmental Impact Analysis Process. Final Environmental Impact Statement Supersonic Flight Operations in the Valentine Military Operations Area

    DTIC Science & Technology

    1983-11-04

    FROH HO UI3W CEH TOi 9-l2,’ý LI 1.U of F Air Force 4~4~4a ~ Environmental Planning DiVision 4LW (HQ USAFICE VP) Roam 5969 120 Air pa Nwatqof 6...about three feet. Applying I this data to Valentine would show the probability of a focus boom impacting any one spot where the overpressure is equal...provide a better understanding I of the relationship between noise and non-auditory ill-health; however, in the interim decisions must be based on that data

  1. Bonneville Power Administration Transmission System Vegetation Management Program - Final Environmental Impact Statement

    SciTech Connect

    N /A

    2000-06-23

    Bonneville is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations in a region of diverse vegetation. This vegetation can interfere with electric power flow, pose safety problems for us and the public, and interfere with our ability to maintain these facilities. We need to (1) keep vegetation away from our electric facilities; (2) increase our program efficiency and consistency; (3) review herbicide use (under increased public scrutiny); and (4) maximize the range of tools we can use while minimizing environmental impact (Integrated Vegetation Management). This Final Environmental Impact Statement (FEIS) establishes Planning Steps for managing vegetation for specific projects (to be tiered to this Environmental Impact Statement (EIS)). In addition to No Action (current practice), alternatives are presented for Rights-of-way, Electric Yards, and Non-electric Facilities (landscaping, work yards). Four vegetation control methods are analyzed manual, mechanical, herbicide, and biological. Also evaluated are 23 herbicide active ingredients and 4 herbicide application techniques (spot, localized, broadcast, and aerial). For rights-of-way, we consider three sets of alternatives: alternative management approaches (time-driven or establishing low-growing plant communities); alternative method packages; and, if herbicides are in a methods package, alternative vegetation selections (noxious weeds, deciduous, or any vegetation). For electric yards, one herbicide-use alternative is considered. For non-electric facilities, two method package alternatives are considered. For rights-of-way, the environmentally preferred alternative(s) would use manual, mechanical, and biological control methods, as well as spot and localized herbicide applications for noxious and deciduous plant species; the BPA-preferred alternative(s) would add broadcast and aerial herbicide applications, and would use herbicides

  2. 75 FR 8988 - Final Environmental Impact Statement; Yosemite Institute Environmental Education Campus; Yosemite...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-26

    .... Under both ``action'' alternatives, energy-efficient, sustainable facilities would be constructed to...) identifying and evaluating three alternatives for redeveloping the Yosemite Institute Environmental Education... identifies and analyzes two ``action'' alternatives and a ``no-action'' alternative. The full spectrums of...

  3. Final Programmatic Environmental Impact Statement, Lake Darling Flood Control Project, Souris River, North Dakota and Final Feature Environmental Impact Statement, Velva Flood Control, Velva, North Dakota.

    DTIC Science & Technology

    1983-11-01

    conservation pool level of 1596 msl is reached. 3.014 The occasional storage of water at higher stages would require an interest in real estate , such as...flowage easements, within the design pool. This real estate includes approximately 800 acres of privately-owned lands upstream of the Upper Souris...14 Aesthetic Values 15 Social Resources 15 5.00 ENVIRONMENTAL EFFECTS 17 Significant Impacts 17 Cultural Resources 21 Recreation Resources 21

  4. Final environmental impact statement, Washington Water Power/B.C. Hydro Transmission Interconnection Project

    SciTech Connect

    Not Available

    1992-10-01

    Washington Water Power (WWP) proposes to construct and operate an electric transmission line that would connect with the electrical system of the British Columbia Hydro and Power Authority (B.C. Hydro). The project would be composed of a double-circuit, 230-kilovolt (kV) transmission line from WWP`s existing Beacon Substation located northeast of Spokane, Washington to the international border located northwest of Metaline Falls, Washington. The original Presidential permit application and associated proposed route presented in the draft environmental impact statement (DEIS) have been modified to terminate at the Beacon Substation, instead of WWP`s initially proposed termination point at the planned Marshall Substation located southwest of Spokane. A supplemental draft EIS was prepared and submitted for review to not only examine the new proposed 5.6 miles of route, but to also compare the new Proposed Route to the other alternatives previously analyzed in the DEIS. This final EIS (FEIS) assesses the environmental effects of the proposed transmission line through construction, operation, maintenance, and abandonment activities and addresses the impacts associated with the Proposed Action, Eastern Alternative, Western Alternative, Northern Crossover Alternative, Southern Crossover Alternative, and No Action Alternative. The FEIS also contains the comments received and the responses to these comments submitted on the DEIS and Supplemental DEIS.

  5. 77 FR 14355 - Notice of Availability of Final Environmental Impact Statement for a Proposed Highway Between I...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-09

    ... Department of the Army, Corps of Engineers Notice of Availability of Final Environmental Impact Statement for... Army, U.S. Army Corps of Engineers, DOD. ACTION: Notice of availability. SUMMARY: Pursuant to the National Environmental Policy Act (NEPA), the U.S. Army Corps of Engineers (USACE), New Orleans...

  6. 76 FR 29021 - Written Re-Evaluation and Record of Decision for the Final Environmental Impact Statement for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-19

    ... Environmental Impact Statement for the Relocation of the Panama City-Bay County International Airport (2006..., Environmental Protection Specialist, Federal Aviation Administration, Orlando Airports District Office, 5950... Federal Aviation Administration Written Re-Evaluation and Record of Decision for the Final...

  7. Interim Columbia and Snake rivers flow improvement measures for salmon: Final Supplemental Environmental Impact Statement (SEIS)

    SciTech Connect

    Not Available

    1993-03-01

    Public comments are sought on this final SEIS, which supplements the 1992 Columbia River Salmon Flow Measures Options Analysis (OA)/Environmental Impact Statement (EIS). The Corps of Engineers, in cooperation with the Bonneville Power Administration and the Bureau of Reclamation proposes five alternatives to improve flows of water in the lower Columbia-Snake rivers in 1993 and future years to assist the migration of juvenile and adult anadromous fish past eight hydropower dams. These are: (1) Without Project (no action) Alternative, (2) the 1992 Operation, (3) the 1992 Operation with Libby/Hungry Horse Sensitivity, (4) a Modified 1992 Operation with Improvements to Salmon Flows from Dworshak, and (5) a Modified 1992 Operation with Upper Snake Sensitivity. Alternative 4, Modified 1992 Operations, has been identified as the preferred alternative.

  8. Operation of Glen Canyon Dam. Final environmental impact statement, summary, comments and responses

    SciTech Connect

    1995-03-01

    The Federal action considered in this environmental impact statement (EIS) is the operation of Glen Canyon Dam, Colorado River Storage Project (CRSP), Arizona. The purpose of the reevaluation is to determine specific options that could be implemented to minimize--consistent with law-adverse impacts on the downstream environmental and cultural resources, as well as Native American interests in Glen and Grand Canyons.

  9. 76 FR 44042 - Notice of Availability of the Final Environmental Impact Statement for the Salt Wells Energy...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-22

    ... 4500021655; TAS: 14X5575] Notice of Availability of the Final Environmental Impact Statement for the Salt... (EIS) for the Salt Wells Energy Projects and by this notice is announcing its availability. DATES: The... of the Salt Wells Energy Projects Final EIS are available in the BLM Carson City District,...

  10. Final Long-Term Management and Storage of Elemental Mercury Environmental Impact Statement Volume 2

    SciTech Connect

    Not Available

    2011-01-01

    Pursuant to the Mercury Export Ban Act of 2008 (P.L. 110-414), DOE was directed to designate a facility or facilities for the long-term management and storage of elemental mercury generated within the United States. Therefore, DOE has analyzed the storage of up to 10,000 metric tons (11,000 tons) of elemental mercury in a facility(ies) constructed and operated in accordance with the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act (74 FR 31723). DOE prepared this Final Mercury Storage EIS in accordance with the National Environmental Policy Act of 1969 (NEPA), as amended (42 U.S.C. 4321 et seq.), the Council on Environmental Quality (CEQ) implementing regulations (40 CFR 1500–1508), and DOE’s NEPA implementing procedures (10 CFR 1021) to evaluate reasonable alternatives for a facility(ies) for the long-term management and storage of elemental mercury. This Final Mercury Storage EIS analyzes the potential environmental, human health, and socioeconomic impacts of elemental mercury storage at seven candidate locations: Grand Junction Disposal Site near Grand Junction, Colorado; Hanford Site near Richland, Washington; Hawthorne Army Depot near Hawthorne, Nevada; Idaho National Laboratory near Idaho Falls, Idaho; Kansas City Plant in Kansas City, Missouri; Savannah River Site near Aiken, South Carolina; and Waste Control Specialists, LLC, site near Andrews, Texas. As required by CEQ NEPA regulations, the No Action Alternative was also analyzed as a basis for comparison. DOE intends to decide (1) where to locate the elemental mercury storage facility(ies) and (2) whether to use existing buildings, new buildings, or a combination of existing and new buildings. DOE’s Preferred Alternative for the long-term management and storage of mercury is the Waste Control Specialists, LLC, site near Andrews, Texas.

  11. Final Long-Term Management and Storage of Elemental Mercury Environmental Impact Statement Volume1

    SciTech Connect

    Not Available

    2011-01-01

    Pursuant to the Mercury Export Ban Act of 2008 (P.L. 110-414), DOE was directed to designate a facility or facilities for the long-term management and storage of elemental mercury generated within the United States. Therefore, DOE has analyzed the storage of up to 10,000 metric tons (11,000 tons) of elemental mercury in a facility(ies) constructed and operated in accordance with the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act (74 FR 31723).DOE prepared this Final Mercury Storage EIS in accordance with the National Environmental Policy Act of 1969 (NEPA), as amended (42 U.S.C. 4321 et seq.), the Council on Environmental Quality (CEQ) implementing regulations (40 CFR 1500–1508), and DOE’s NEPA implementing procedures (10 CFR 1021) to evaluate reasonable alternatives for a facility(ies) for the long-term management and storage of elemental mercury. This Final Mercury Storage EIS analyzes the potential environmental, human health, and socioeconomic impacts of elemental mercury storage at seven candidate locations:Grand Junction Disposal Site near Grand Junction, Colorado; Hanford Site near Richland, Washington; Hawthorne Army Depot near Hawthorne, Nevada; Idaho National Laboratory near Idaho Falls, Idaho;Kansas City Plant in Kansas City, Missouri; Savannah River Site near Aiken, South Carolina; and Waste Control Specialists, LLC, site near Andrews, Texas. As required by CEQ NEPA regulations, the No Action Alternative was also analyzed as a basis for comparison. DOE intends to decide (1) where to locate the elemental mercury storage facility(ies) and (2) whether to use existing buildings, new buildings, or a combination of existing and new buildings. DOE’s Preferred Alternative for the long-term management and storage of mercury is the Waste Control Specialists, LLC, site near Andrews, Texas.

  12. 76 FR 34096 - Notice of Availability of the Record of Decision for the Final Environmental Impact Statement and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-10

    ... Impact Statement and the South Gillette Area West Coal Creek Coal Lease-by-Application, Wyoming AGENCY... of the Record of Decision (ROD) for the West Coal Creek Coal Lease-by- Application (LBA) included in the South Gillette Area Coal Lease Applications Final Environmental Impact Statement (EIS). ADDRESSES...

  13. Initial Northwest Power Act Power Sales Contracts : Final Environmental Impact Statement. Volume 2, Appendices A--L.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-01-01

    This report consists of appendices A-L of the final environmental impact statement for the Bonneville Power Administration. The appendices provide information on the following: Ninth circuit Court opinion in Forelaws on Board v. Johnson; guide to Northwest Power act contracts; guide to hydro operations; glossary; affected environment supporting documentation; environmental impacts of generic resource types; information on models used; technical information on analysis; public involvement activities; bibliography; Pacific Northwest Electric Power Planning and Conservation Act; and biological assessment. (CBS)

  14. Resource Contingency Program - Oregon : Final Environmental Impact Statement, Hermiston Power Project.

    SciTech Connect

    United States. Bonneville Power Administration.

    1995-09-01

    The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. In 1990, to cover the outer range of potential load growth with new resources, BPA embarked upon the Resource Contingency Program (RCP). Instead of buying or building generating plants now, BPA has purchased options to acquire power later, if and when it is needed. The decision to acquire any of these option energy projects to fulfill statutory supply obligations will be influenced by Federal system load growth, the outcome of BPA`s Business Plan, required operational changes in Columbia-Snake River Hydroelectric facilities, and the loss of major generating resources. In September 1993, three option development agreements were signed with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop, Washington, and near Hermiston, Oregon. Together these three projects could supply BPA with 1,090 average megawatts (aMW) of power. Under these agreements, sponsors are obtaining permits and conducting project design work, and BPA is completing this EIS process. In September 1993, BPA published a Notice of Intent to prepare an environmental impact statement (EIS) on these three proposed gas-fired combustion turbine projects and held public scoping meetings in October 1993 at each site. In February 1994, BPA released an Implementation Plan on the proposed scope of the EIS. A draft EIS on the three proposed projects was published in February 1995. The impacts of the Chehalis and Satsop projects located in Washington State will be covered in one EIS document, while the impacts of the Hermiston project located in Oregon are covered in this final EIS document. It is BPA`s intent to continue to base the analysis of impacts on the assumption that all three projects may be constructed at some point in the future.

  15. 78 FR 21919 - Finding of No Significant Impact and Final Programmatic Environmental Assessment for Army 2020...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-12

    ... Programmatic Environmental Assessment for Army 2020 Force Structure Realignment (PEA), supporting studies, and... Impact Statement; therefore, one will not be prepared. An electronic version of the FNSI and PEA is...

  16. Disposal and reuse of Myrtle Beach Air Force Base, South Carolina final environmental impact statement. Final report

    SciTech Connect

    1993-02-01

    Pursuant to the Defense Base Closure and Realignment Act of 1990, Myrtle Beach AFB closed in March 1993. This EIS was prepared in accordance with the National Environmental Policy Act to analyze the potential environmental consequences of the disposal of the base. Although disposal will create few direct impacts, reuse by others will create indirect impacts. The EIS analyzes the effects a range of reasonable foreseeable alternative reuses may have on the local community; including land use and aesthetics, transportation, utilities, hazardous materials/wastes, geology and soils, water resources, air quality, noise, biological resources, and cultural resources. Preservation covenants within the disposal document could eliminate or reduce any negative environmental effects to a non-adverse level. Because the Air Force is disposing of the property, some of the mitigation measures are beyond Air Force control. Remediation of Installation Restoration Program sites will continue to be the responsibility of the Air Force.

  17. Minnesota River at Chaska, Minnesota, Flood Control. Final Environmental Impact Statement.

    DTIC Science & Technology

    1975-07-01

    Control Projects 29 Local Recreation and Aesthitics 29 History and Archeology 30 iii ,L . , , ’ -’ - " TABLE OF CONTENTS (CONT) page 3. ENVIRONMENTAL...39 Impacts upon Recreation and Aesthetics 39 Impacts upon Historical and Archeological Sites 40 4. UNAVOIDABLE ADVERSE IMPACTS OF THE PROPOSED ACTION...Apr 74 ..- HISTORY AND ARCHEOLOGY Carver County, established 20 February 1855, was named for Captain Jonathan Carver, an English explorer and author. At

  18. Environmental Impact Analysis Process. Final Environmental Impact Statement. Air Force, Space Division Housing Project, San Pedro, California

    DTIC Science & Technology

    1986-07-24

    Occupational Health Deputy Assistant Secretary of the Air Force (Installations, Environment and Safety) 1 Atch Final EIS, Vol. 2 COVER SHEET (a...Force is respornible for the health and welfare of its military personnel and their dependents, including provisions for adequate housing through either...narrowly focused in at least eight areas: 1. The final EIS should incorporate a more detailed assessment of the possible presence and health and safety

  19. Final Environmental Impact Report/Environmental Impact Statement, Cullinan Ranch Specific Plan, City of Vallejo, Solano County, California.

    DTIC Science & Technology

    1984-05-01

    IRRETRIEVABLE COMMITMENTS OF RESOURCES WHICH WOULD BE INVOLVED IN THE PROPOSED ACTION SHOULD IT BE IMPLEMENTED 150 VII. GROWTH- INDUCING IMPACTS OF THE...indicated with an asterisk (). 1. Growth inducement with required expansion of infrastructure to support additional population. 2. Residential use of diked...Alternative C) or 626 acres (Alternative E) 4. Growth Inducing Impacts I Project Alternatives A, B, C and E, in and of themselves are growth inducing

  20. 76 FR 18573 - Notice of Availability of a Final Environmental Impact Statement for the Sunset Area Community...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-04

    ... shopping and commercial space; and green infrastructure. Sunset Terrace's redevelopment provides the... URBAN DEVELOPMENT Notice of Availability of a Final Environmental Impact Statement for the Sunset Area... Planning and Development, HUD. ACTION: Notice. ] SUMMARY: The Department of Housing and Urban Development...

  1. 77 FR 54922 - Record of Decision for the General Management Plan/Final Environmental Impact Statement, Hampton...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-06

    ... National Park Service Record of Decision for the General Management Plan/Final Environmental Impact Statement, Hampton National Historic Site, Maryland AGENCY: National Park Service, Interior. ACTION: Notice... (NEPA), the National Park Service (NPS) announces the availability of the Record of Decision for the...

  2. 76 FR 12103 - Notice of Availability of the Final Site-Wide Environmental Impact Statement for the Y-12...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-04

    .... Department of Energy. ACTION: Notice of availability. SUMMARY: The National Nuclear Security Administration... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY National Nuclear Security Administration Notice of Availability of the Final Site-Wide Environmental Impact...

  3. 75 FR 60804 - Notice of Availability of the Final Environmental Impact Statement for the West Butte Wind Power...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-01

    ... Butte Wind Power Right-of-Way, Crook and Deschutes Counties, OR AGENCY: Bureau of Land Management... prepared a Final Environmental Impact Statement (EIS) for the West Butte Wind Power Right-of-Way and by... Federal Register notice. FOR FURTHER INFORMATION CONTACT: Steve Storo, BLM West Butte Wind Power Right...

  4. 76 FR 29218 - Availability of a Final Environmental Impact Statement To Consider Issuance of a Department of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-20

    ... Mining Company's Proposal To Construct, Operate, and Reclaim the Rusk Permit Area, Rusk, Panola, and Harrison Counties, TX (USACE Project No. SWF-2007-00560) AGENCY: Department of the Army, U.S. Army Corps of... Final Environmental Impact Statement (FEIS). This FEIS evaluates project alternatives and potential...

  5. 78 FR 50051 - Notice of Availability of the Final Environmental Impact Statement for the Tarmac King Road...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-16

    ... Department of the Army, Corps of Engineers Notice of Availability of the Final Environmental Impact Statement... Engineers, DoD. ACTION: Notice of availability. SUMMARY: The U.S. Army Corps of Engineers (USACE) is issuing... Engineers, Jacksonville District, 41 N. Jefferson Street, Suite 301, Pensacola, Florida 32502, Telephone...

  6. 76 FR 18298 - Notice of Availability of a Final Environmental Impact Statement for the DesertXpress High-Speed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-01

    ... DesertXpress High-Speed Passenger Train Project AGENCY: Federal Railroad Administration (FRA), United... the public that a Final Environmental Impact Statement (EIS) is being published for the DesertXpress High-Speed Passenger Train Project (DesertXpress project). FRA is the Lead Agency for the...

  7. 75 FR 3221 - Ruby Pipeline, L.L.C.; Notice of Availability of the Final Environmental Impact Statement for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-20

    ... Energy Regulatory Commission Ruby Pipeline, L.L.C.; Notice of Availability of the Final Environmental Impact Statement for the Proposed Ruby Pipeline Project January 8, 2010. The staff of the Federal Energy... Ruby Pipeline Project proposed by Ruby Pipeline, L.L.C. (Ruby) in the above-referenced docket....

  8. 78 FR 11672 - Notice of Availability of the Final Environmental Impact Statement for the Alta East Wind Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-19

    ... of Mojave and 11 miles east of the city of Tehachapi. The project would include wind turbines, access... East Wind Project, Kern County, CA, and Proposed Land Use Plan Amendment AGENCY: Bureau of Land... (CDCA) Plan Amendment/Final Environmental Impact Statement (EIS) for the Alta East Wind Project (Project...

  9. 77 FR 51527 - Notice of Availability for the Final Environmental Impact Statement for the Proposed Widening of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-24

    ... other waters of the United States associated with the proposed widening of the Pascagoula Lower Sound... Department of the Army; Corps of Engineers Notice of Availability for the Final Environmental Impact... AGENCY: Department of the Army, U.S. Army Corps of Engineers, DoD ACTION: Notice of availability. SUMMARY...

  10. 75 FR 57286 - Notice of Availability of the Final Environmental Impact Statement for the NextLight Renewable...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-20

    ..., 230-kilovolt (kV) and 220-kV transmission lines, an operation and maintenance area, a switchyard... Power, LLC, Silver State Solar Project, Clark County, NV AGENCY: Bureau of Land Management, Interior... Management (BLM) has prepared a Final Environmental Impact Statement (EIS) for the Silver State Solar...

  11. 76 FR 9054 - Notice of Availability of Final Environmental Impact Statement for the AREVA Enrichment Services...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-16

    ... preconstruction activities. The Final EIS is being issued as part of the NRC's process to decide whether to issue..., public and occupational health, waste management, socioeconomics, and environmental justice. Additionally....'' This appendix contains proprietary business information as well as security-related information....

  12. 77 FR 12877 - Record of Decision for the General Management Plan/Abbreviated Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-02

    ... National Park Service Record of Decision for the General Management Plan/Abbreviated Final Environmental... Management Plan for New River Gorge National River, West Virginia. The Record of Decision selects the... the Record of Decision selecting Alternative 5 as the approved General Management Plan for New River...

  13. Occidental Geothermal, Inc. , Oxy geothermal power plant No. 1. Final environmental impact report

    SciTech Connect

    Not Available

    1981-12-01

    The project-specific environmental analysis covers the following: geology, soils, water resources, biology, air quality, noise, waste management, health, safety, transportation, energy and material resources, cultural resources, socioeconomics, public services, land use, and aesthetics. Other topics covered are: the cumulative envionmental analysis; unavoidable significant adverse environmental effects; irreversible environmental changes and irretrievable commitments of energy and materials; the relationship between local short-term uses of man's environment and the maintenance and enhancement of long-term productivity; growth-inducing impacts; and alternatives to the proposed action. (MHR)

  14. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix C: Anadromous Fish and Juvenile Fish Transportation.

    SciTech Connect

    Columbia River System Operation Review

    1995-11-01

    This Appendix C of the Final Environmental Impact Statement for the Columbia River System discusses impacts on andromous fish and juvenile fish transportation. The principal andromous fish in the Columbia basin include salmonid species (Chinook, coho, and sockeye salmon, and steelhead) and nonsalmoinid andromous species (sturgeon, lamprey, and shad). Major sections in this document include the following: background, scope and process; affected environment for salmon and steelhead, shaded, lamprey, sturgeon; study methods; description of alternatives: qualitative and quantitative findings.

  15. 76 FR 29278 - Luminant Generation Company LLC.; Notice of Availability of the Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-20

    ... Statement for Combined Licenses for Comanche Peak Nuclear Power Plant Units 3 and 4 Notice is hereby given..., ``Environmental Impact Statement for Combined Licenses (COLs) for Comanche Peak Nuclear Power Plant Units 3 and 4... From the Federal Register Online via the Government Publishing Office NUCLEAR...

  16. 75 FR 38540 - Notice of Availability of Final Supplemental Environmental Impact Statement Updating Cumulative...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-02

    ... Analysis for the Newmont Mining Corporation South Operations Area Project Amendment, Nevada AGENCY: Bureau... Environmental Impact Statement (EIS) to update the cumulative effects analysis for Newmont Mining Corporation's... Decision (ROD) for Newmont Mining Corporation's South Operations Area Project Amendment (SOAPA), an...

  17. 76 FR 52655 - Pacific Gas and Electric Company; Notice of Availability of the Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-23

    ... Environmental Impact Statement for the Kilarc-Cow Creek Hydroelectric Project In accordance with the National... application, filed March 12, 2009, requesting surrender of the Kilarc-Cow Creek Project (FERC No. 606) license. The project is located on Old Cow Creek, South Cow Creek, and tributaries in Shasta County, California...

  18. 77 FR 5505 - Eagle Crest Energy Company; Notice of Availability of the Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-03

    ... Environmental Impact Statement for the Eagle Mountain Pumped Storage Hydroelectric Project In accordance with... Hydroelectric Project (FERC No. 13123), located on the site of the largely inactive Eagle Mountain mine in... proposal and the alternatives for a licensee for the Eagle Mountain Pumped Storage Hydroelectric...

  19. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix R: Pacific Northwest Coordination agreement (PNCA).

    SciTech Connect

    Columbia River System Operation Review

    1995-11-01

    Currently, the Federal government coordinates the planning and operation of the Federal Columbia River Power System (FCRPS) with projects owned and operated by the region`s non-Federal hydrogenerating utilities pursuant to the Pacific North-west Coordination Agreement (PNCA). The Bureau of Reclamation (Reclamation), the Corps of Engineers (Corps), and the Bonneville Power Administration (BPA) are parties to the PNCA on behalf of the government of the United States. The PNCA is a complex agreement that provides an opportunity for the region`s power producers to maximize the power system`s reliability and economy while meeting their multiple-use objectives. The PNCA does not dictate the operation of the resources it coordinates. It is essentially an accounting mechanism that exchanges the power produced among the parties in order to improve the reliability of the system and reduce regional power costs. Project owners retain complete autonomy to operate as needed to meet their multiple-use requirements. The PNCA was executed in 1964 as an important component of regional plans to maximize the Northwest`s hydro resource capability. Maximization also included the development of storage projects on the Columbia River in Canada pursuant to the terms of the 1964 Columbia River Treaty. Because of the link between power coordination and Treaty issues, the current parties to the PNCA, currently are contemplating entering into a replacement or renewed power coordination agreement. Because the power coordination agreement is a consensual arrangement, its ultimate provisions must be acceptable to all of its signatories. This Appendix R to the Final Environmental Impact Statement of the Columbia River System is a presentation of the Pacific North-west Coordination Agreement.

  20. Mid-Columbia Coho Reintroduction Feasibility Project : Final Environmental Assessment and Finding of No Significant Impact.

    SciTech Connect

    United States. Bonneville Power Administration; Confederated Tribes and Bands of the Yakama Nation; Washington State Department of Fish and Wildlife

    1999-04-01

    Bonneville Power Administration (BPA) is proposing to fund research for 2 to 3 years on the feasibility of reintroducing coho salmon into mid-Columbia River basin tributaries. The research would take place in the Methow and Wenatchee river basins in Chelan and Okanogan Counties, Washington. BPA has prepared an Environmental Assessment (EA) (DOE/EA-1282) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and BPA is issuing this Finding of No Significant Impact.

  1. Tucannon River Spring Chinook Captive Broodstock Program Final Environmental Assessment and Finding of No Significant Impact

    SciTech Connect

    N /A

    2000-05-24

    Bonneville Power Administration (BPA) is proposing to fund the Tucannon River Spring Chinook Captive Broodstock Program, a small-scale production initiative designed to increase numbers of a weak but potentially recoverable population of spring chinook salmon in the Tucannon River in the State of Washington. BPA has prepared an Environmental Assessment (EA) (DOE/EA-l326) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and BPA is issuing this Finding of No Significant Impact (FONSI).

  2. 76 FR 38429 - Notice of Availability of Final Programmatic Environmental Impact Statement/Overseas...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-30

    ... low-energy seismic and non- seismic acoustic sources. The Final PEIS examines the potential impacts... natural environment. Under the Proposed Action, a variety of acoustic sources used for research activities.... academic institutions or government agencies. The seismic acoustic sources would include various airgun...

  3. 75 FR 10308 - Fire Management Plan, Final Environmental Impact Statement, Record of Decision, Grand Canyon...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-05

    ... Doc No: 2010-4414] DEPARTMENT OF THE INTERIOR National Park Service Fire Management Plan, Final... Impact Statement for the Fire Management Plan, Grand Canyon National Park. SUMMARY: Pursuant to the... availability of the Record of Decision for the Fire Management Plan, Grand Canyon National Park, Arizona....

  4. 75 FR 53964 - Idaho Power Company, Idaho; Notice of Availability of Final Environmental Impact Statement for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-02

    ... Impact Statement for the Swan Falls Project August 26, 2010. In accordance with the National... Office of Energy Projects has reviewed Idaho Power Company's application for license for the Swan Falls... alternatives for relicensing the Swan Falls Project. The final EIS documents the views of governmental...

  5. Proposed Tenaska Washington II Generation Project : Final Environmental Impact Statement: Summary.

    SciTech Connect

    United States. Bonneville Power Administration.

    1994-01-01

    BPA is considering whether to purchase electrical power from a proposed privately-owned combustion-turbine electrical generation plant in Washington. The plant would be fired by natural gas and would use combined-cycle technology to generate 240 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Tenaska Washington Partners II, L.P. The project would be located about 19 kilometers (12 miles) southeast of downtown Tacoma in the Frederickson Industrial Area, Pierce County. The proposed plant would occupy about half of a 6.4-hectare (16-acre) parcel and would be consistent with the industrial character of its surroundings. The proposed site is currently undeveloped and zoned for industrial use by the county. Main environmental concerns identified in the scoping process and in comments on the Draft Environmental Impact Statement (EIS) include: (1) potential air quality impacts, such as emissions and their contribution to the {open_quotes}greenhouse{close_quotes} effect; (2) potential health and safety impacts, such as nuisance odors, plant safety, visibility and heat-emission systems which may affect low-flying planes and potential health effects of electric and magnetic fields; and (3) potential water quality and quantity impacts, such as the amount of wastewater to be discharged, the source and amount of water required for plant operation. These and other issues are discussed in detail in the EIS. The proposed project already includes many features designed to reduce environmental impacts. Based on investigations performed for the EIS, no significant unavoidable adverse environmental impacts associated with the proposed project were identified, and no evidence emerged to suggest that the proposed action is controversial. The EIS is being mailed to numerous agencies, groups, and individuals (see Section 8.0). There will be a 30-day no-action period before any decisions are made and the Record of Decision is signed.

  6. Proposed Tenaska Washington II Generation Project : Final Environmental Impact Statement. Volume 1: Environmental Analysis and Technical Appendices.

    SciTech Connect

    United States. Bonneville Power Administration.

    1994-01-01

    BPA is considering whether to purchase electrical power from a proposed privately-owned combustion-turbine electrical generation plant in Washington. The plant would be fired by natural gas and would use combined-cycle technology to generate 240 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Tenaska Washington Partners II, L.P. The project would be located about 19 kilometers (12 miles) southeast of downtown Tacoma in the Frederickson Industrial Area, Pierce County. The proposed plant would occupy about half of a 6.4-hectare (16-acre) parcel and would be consistent with the industrial character of its surroundings. The proposed site is currently undeveloped and zoned for industrial use by the county. Main environmental concerns identified in the scoping process and in comments on the Draft Environmental Impact Statement (EIS) include: (1) potential air quality impacts, such as emissions and their contribution to the {open_quotes}greenhouse{close_quotes} effect; (2) potential health and safety impacts, such as nuisance odors, plant safety, visibility and heat-emission systems which may affect low-flying planes and potential health effects of electric and magnetic fields; and (3) potential water quality and quantity impacts, such as the amount of wastewater to be discharged, the source and amount of water required for plant operation. These and other issues are discussed in detail in the EIS. The proposed project already includes many features designed to reduce environmental impacts. Based on investigations performed for the EIS, no significant unavoidable adverse environmental impacts associated with the proposed project were identified, and no evidence emerged to suggest that the proposed action is controversial. The EIS is being mailed to numerous agencies, groups, and individuals (see Section 8.0). There will be a 30-day no-action period before any decisions are made and the Record of Decision is signed.

  7. Proposed Tenaska Washington II Generation Project : Final Environmental Impact Statement. Volume 2: Public Involvement.

    SciTech Connect

    United States. Bonneville Power Administration.

    1994-01-01

    In regard to the proposed Tenaska Washington II Generation Project, the goal of the Bonneville Power Administration`s (BPA) Environmental Impact Statement (EIS) public involvement process is to determine the issues to be examined and pertinent analyses to be conducted and to solicit comments on the content and quality of information presented in the Draft Environmental Impact Statement (DEIS). Comments and questions are solicited from the public and government agencies during the scoping process and during the comment period and public hearing on the DEIS, to find out what is of most concern to them. The end product of the public involvement process is the Comment Report which follows in part of this volume on Public Involvement.

  8. Sierra Pacific Power Company Alturas Transmission Line Project, Final Environmental Impact Report/Environmental Impact Statement. Volume 2: Comments and responses

    SciTech Connect

    1995-11-01

    Sierra Pacific Power Company has proposed the construction and operation of a 345,000 volt overhead electric power transmission line from Alturas, California to Reno, Nevada. This Environmental Impact Report/Environmental Impact Statement will assess the potential environmental impacts of the proposed project and alternatives. This report contains public comments which were received on the Draft EIR/S. Significant issues may be identified through public and agency comments.

  9. Final environmental impact statement/report. Volume 4. Comment letters and public hearing transcripts. Northeast corridor improvement project electrication: New Haven, CT to Boston, MA

    SciTech Connect

    1994-10-01

    This document is the final environmental impact statement and final environmental impact report (FEIS/R) on the proposal by the National Railroad Passenger Corporation (Amtrak) to complete the electrification of the Northeast Corridor main line by extending electric traction from New Haven, CT, to Boston, MA. This document (Volume IV) reprints the comments received on the DEIS/R.

  10. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix N: Wildlife.

    SciTech Connect

    Columbia River System Operation Review

    1995-11-01

    The Columbia River System is a vast and complex combination of Federal and non-Federal facilities used for many purposes including power production, irrigation, navigation, flood control, recreation, fish and wildlife habitat and municipal and industrial water supply. Each river use competes for the limited water resources in the Columbia River Basin. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The environmental impact statement (EIS) itself and some of the other appendices present analyses of the alternative approaches to the other three decisions considered as part of the SOR. This document is the product of the Wildlife Work Group, focusing on wildlife impacts but not including fishes. Topics covered include the following: scope and process; existing and affected environment, including specific discussion of 18 projects in the Columbia river basin. Analysis, evaluation, and alternatives are presented for all projects. System wide impacts to wildlife are also included.

  11. Appendix to the final environmental impact report supplement. Northeast Corridor Improvement Project electrification, New Haven, CT to Boston, MA. Final report

    SciTech Connect

    1995-05-01

    This document is an appendix to the final Environmental Impact Report Supplement, published on February 15, 1995, addressing the proposal by the National Railroad Passenger Corporation (Amtrak) to complete the electrification of the Northeast Corridor main line by extending electric traction from New Haven, CT, to Boston, MA. The purpose of this document is to discuss the selection of the Boston area electrical substation site and the relocation of a paralleling station in East Foxboro.

  12. Environmental impacts of ocean disposal of CO{sub 2}. Final report volume 1, September 1994--August 1996

    SciTech Connect

    Adams, E.E.; Herzog, H.J.

    1996-12-01

    One option to reduce atmospheric CO{sub 2} levels is to capture and sequester power plant CO{sub 2}. Commercial CO{sub 2} capture technology, though expensive, exists today. However, the ability to dispose of large quantities of CO{sub 2} is highly uncertain. The deep ocean is one of only a few possible CO{sub 2} disposal options and is a prime candidate because the deep ocean is vast and highly unsaturated in CO{sub 2}. Ocean disposal of CO{sub 2} will only make sense if the environmental impacts to the ocean are significantly less than the avoided impacts of atmospheric release. In this project, we examined these ocean impacts through a multi-disciplinary effort designed to summarize the current state of knowledge. In the process, we have developed a comprehensive method to assess the impacts of pH changes on passive marine organisms. This final report addresses the following six topics: CO{sub 2} loadings and scenarios, impacts of CO{sub 2} transport, near-field perturbations, far-field perturbations, environmental impacts of CO{sub 2} release, and policy and legal implications of CO{sub 2} release. While there are several important environmental impacts of ocean disposal of CO{sub 2}, the acidification around the release point may be the most important. However, the size and severity of the impacted area varies substantially with the injection scenario. We have quantified the impacts of various injection scenarios relative to each other through mortality measures. Based on available data, it appears possible to inject CO{sub 2} into the deep ocean in such a way as to yield negligible environmental impacts.

  13. Initial Northwest Power Act Power Sales Contracts : Final Environmental Impact Statement. Volume 3, Appendix M, Contract Copies.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-01-01

    This report, is part of the final environmental impact statement of the Bonneville Power Administration, consists of an appendix of contract copies related to the following: Detailed Index to Generic Utility Power Sales Contracts, Text of Generic Utility Contract, Detailed Index to Generic DSI Power Sales Contracts, Text of Generic DSI Contract, Text of Residential Purchase and Sale Agreement (Residential Exchange), and Detailed Index to General Contract Provisions -- GCP Form PSC-2 (Incorporated into all three types of contracts as an Exhibit).

  14. Final environmental impact statement. Management of commercially generated radioactive waste. Volume 1 of 3

    SciTech Connect

    Not Available

    1980-10-01

    This EIS analyzes the significant environmental impacts that could occur if various technologies for management and disposal of high-level and transuranic wastes from commercial nuclear power reactors were to be developed and implemented. This EIS will serve as the environmental input for the decision on which technology, or technologies, will be emphasized in further research and development activities in the commercial waste management program. The action proposed in this EIS is to (1) adopt a national strategy to develop mined geologic repositories for disposal of commercially generated high-level and transuranic radioactive waste (while continuing to examine subseabed and very deep hole disposal as potential backup technologies) and (2) conduct a R and D program to develop such facilities and the necessary technology to ensure the safe long-term containment and isolation of these wastes. The Department has considered in this statement: development of conventionally mined deep geologic repositories for disposal of spent fuel from nuclear power reactors and/or radioactive fuel reprocessing wastes; balanced development of several alternative disposal methods; and no waste disposal action. This EIS reflects the public review of and comments offered on the draft statement. Included are descriptions of the characteristics of nuclear waste, the alternative disposal methods under consideration, and potential environmental impacts and costs of implementing these methods. Because of the programmatic nature of this document and the preliminary nature of certain design elements assumed in assessing the environmental consequences of the various alternatives, this study has been based on generic, rather than specific, systems. At such time as specific facilities are identified for particular sites, statements addressing site-specific aspects will be prepared for public review and comment.

  15. Final environmental impact statement, Coyote Springs Cogeneration Project, Morrow County, Oregon - appendices

    SciTech Connect

    Not Available

    1994-07-01

    Portland General Electric Company (PGE) has submitted an Application for Site Certification (ASC) to the Oregon Department of Energy for development of the Coyote Springs cogeneration power plant in the Port of Morrow, Oregon. This document includes the appendixes for the Environmental Impact Statement. Appendix topics include the following: A-Wildlife and vegetation surveys; B-EMF Supplement; C-Biological Assessment; D-Oregon DOE proposed order, in the matter of the Application for Site Certificate of Portland General Electric Company; E-Ecological Monitoring Program; F-Air contaminant Discharge permit; G-National Pollution Discharge Elimination System Storm Water Discharge Permit; H-Erosion and Sedimentation Control Plan.

  16. Final environmental impact statement/report. Volume 3. Response to comments on draft environmental impact statement/report. Northeast corridor improvement project electrification: New Haven CT to Boston, MA

    SciTech Connect

    1994-10-31

    This document is the final environmental impact statement and final environmental impact report (FEIS/R) on the proposal by the National Railroad Passenger Corporation (Amtrak) to complete the electrification of the Northeast Corridor main line by extending electric traction from New Haven, CT, to Boston, MA. This document (Volume III) of the FEIS/R presents summaries of comments received on the DEIS/R and responses to these comments.

  17. 77 FR 40080 - Final Programmatic Environmental Impact Statement (PEIS) for the Proposed Final Five-Year Outer...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-06

    ... Proposed Final Five-Year Outer Continental Shelf (OCS) Oil and Gas Leasing Program for 2012-2017 AGENCY... 2012- 2017 Final PEIS prepared by BOEM to support the Proposed Final 5-Year OCS Oil and Gas Leasing Program for 2012-2017. FOR FURTHER INFORMATION CONTACT: Bureau of Ocean Energy Management, Headquarters...

  18. Savannah River Site Spent Nuclear Fuel Management Final Environmental Impact Statement

    SciTech Connect

    N /A

    2000-04-14

    The proposed DOE action considered in this environmental impact statement (EIS) is to implement appropriate processes for the safe and efficient management of spent nuclear fuel and targets at the Savannah River Site (SRS) in Aiken County, South Carolina, including placing these materials in forms suitable for ultimate disposition. Options to treat, package, and store this material are discussed. The material included in this EIS consists of approximately 68 metric tons heavy metal (MTHM) of spent nuclear fuel 20 MTHM of aluminum-based spent nuclear fuel at SRS, as much as 28 MTHM of aluminum-clad spent nuclear fuel from foreign and domestic research reactors to be shipped to SRS through 2035, and 20 MTHM of stainless-steel or zirconium-clad spent nuclear fuel and some Americium/Curium Targets stored at SRS. Alternatives considered in this EIS encompass a range of new packaging, new processing, and conventional processing technologies, as well as the No Action Alternative. A preferred alternative is identified in which DOE would prepare about 97% by volume (about 60% by mass) of the aluminum-based fuel for disposition using a melt and dilute treatment process. The remaining 3% by volume (about 40% by mass) would be managed using chemical separation. Impacts are assessed primarily in the areas of water resources, air resources, public and worker health, waste management, socioeconomic, and cumulative impacts.

  19. Delivery of the Canadian Entitlement : Final Environmental Impact Statement : Record of Decision, Summary..

    SciTech Connect

    United States. Bonneville Power Administration.

    1996-01-01

    The US Entity (the Administrator of the Bonneville Power Administration (BPA) and the Division Engineer, North Pacific Division of the US Army Corps of Engineers) has decided to fulfill its obligation under the Columbia River Treaty (Treaty) between the US and Canada by delivering Canada`s Entitlement under the Treaty to a point on the US/Canada border near Oliver, British Columbia (BC). Delivering the Entitlement at that location will require BPA to construct and operate a new single-circuit 500-kV transmission line from Grand Coulee or Chief Joseph Substation to the US/Canada border, a distance of 135 to 155 kilometers (85 to 95 miles), depending on the alignment selected. This paper describes the decision process and its environmental impacts.

  20. Decommissioning of eight surplus production reactors at the Hanford Site, Richland, Washington. Addendum (Final Environmental Impact Statement)

    SciTech Connect

    Not Available

    1992-12-01

    The first section of this volume summarizes the content of the draft environmental impact statement (DEIS) and this Addendum, which together constitute the final environmental impact statement (FEIS) prepared on the decommissioning of eight surplus plutonium production reactors at Hanford. The FEIS consists of two volumes. The first volume is the DEIS as written. The second volume (this Addendum) consists of a summary; Chapter 9, which contains comments on the DEIS and provides DOE`s responses to the comments; Appendix F, which provides additional health effects information; Appendix K, which contains costs of decommissioning in 1990 dollars; Appendix L, which contains additional graphite leaching data; Appendix M, which contains a discussion of accident scenarios; Appendix N, which contains errata; and Appendix 0, which contains reproductions of the letters, transcripts, and exhibits that constitute the record for the public comment period.

  1. Selenium transformation in coal mine spoils: Its environmental impact assessment. Final report

    SciTech Connect

    Harness, J.; Atalay, A.; Koll, K.J.; Zhang, H.; Maggon, D.

    1991-12-31

    The objective of this program was to conduct an environmental impact assessment study for selenium from coal mine spoils. The use of in-situ lysimetry to predict selenium speciation, transformation, and mobility under natural conditions was evaluated. The scope of the study was to construct and test field-scale lysimeter and laboratory mini-column to assess mobility and speciation of selenium in coal mine overburden and soil systems; to conduct soil and groundwater sampling throughout the state of Oklahoma for an overall environmental impact assessment of selenium; and to conduct an in-depth literature review on the solubility, speciation, mobility, and toxicity of selenium from various sources. Groundwater and surface soil samples were also collected from each county in Oklahoma. Data collected from the lysimeter study indicated that selenium in the overburden of the abandoned mine site was mainly found in the selenite form. The amount of selenite found was too low and immobile to be of concern to the environment. The spoil had equilibrated long enough (over 50 years) that most of the soluble forms of selenium have already been lost. Examination of the overburden indicated the presence of pyrite crystals that precipitated over time. The laboratory mini-column study indicated that selenite is quite immobile and remained on the overburden material even after leaching with dilute acid. Data from groundwater samples indicated that based on the current permissible level for selenium in groundwater (0.01 mg Se/L), Oklahoma groundwater is widely contaminated with the element. However, according to the new regulation (0.05 mg Se/L), which is to be promulgated in 1992, only 9 of the 77 counties in the state exceed the limit.

  2. Proposed IMS infrastructure improvement project, Seward, Alaska. Final environmental impact statement

    SciTech Connect

    Not Available

    1994-09-01

    This Environmental Impact Statement (EIS) examines a proposal for improvements at the existing University of Alaska, Fairbanks, Institute of Marine Science (IMS), Seward Marine Center. The Exxon Valdez Oil Spill (EVOS) Trustee Council is proposing to improve the existing research infrastructure to enhance the EVOS Trustee Council`s capabilities to study and rehabilitate marine mammals, marine birds, and the ecosystem injured by the Exxon Valdez oil spill. The analysis in this document focuses on the effects associated with construction and operation of the proposed project and its proposed alternatives. The EIS gives a detailed description of all major elements of the proposed project and its alternatives; identifies resources of major concern that were raised during the scoping process; describes the environmental background conditions of those resources; defines and analyzes the potential effects of the proposed project and its alternatives on these conditions; and identifies mitigating measures that are part of the project design as well as those proposed to minimize or reduce the adverse effects. Included in the EIS are written and oral comments received during the public comment period.

  3. Final environmental impact statement. Management of commercially generated radioactive waste. Volume 2. Appendices

    SciTech Connect

    Not Available

    1980-10-01

    This EIS analyzes the significant environmental impacts that could occur if various technologies for management and disposal of high-level and transuranic wastes from commercial nuclear power reactors were to be developed and implemented. This EIS will serve as the environmental input for the decision on which technology, or technologies, will be emphasized in further research and development activities in the commercial waste management program. The action proposed in this EIS is to (1) adopt a national strategy to develop mined geologic repositories for disposal of commercially generated high-level and transuranic radioactive waste (while continuing to examine subseabed and very deep hole disposal as potential backup technologies) and (2) conduct a R and D program to develop such facilities and the necessary technology to ensure the safe long-term containment and isolation of these wastes. The Department has considered in this statement: development of conventionally mined deep geologic repositories for disposal of spent fuel from nuclear power reactors and/or radioactive fuel reprocessing wastes; balanced development of several alternative disposal methods; and no waste disposal action. This volume contains appendices of supplementary data on waste management systems, geologic disposal, radiological standards, radiation dose calculation models, related health effects, baseline ecology, socio-economic conditions, hazard indices, comparison of defense and commercial wastes, design considerations, and wastes from thorium-based fuel cycle alternatives. (DMC)

  4. Final Environmental Impact Statement for the construction and operation of Claiborne Enrichment Center, Homer, Louisiana (Docket No. 70-3070)

    SciTech Connect

    Zeitoun, A.

    1994-08-01

    This two-volume Final Environmental Impact Statement (FEIS) was prepared by the Nuclear Regulatory Commission (NRC) in accordance with regulation 10 CFR Part 51, which implements the National Environmental Policy Act (NEPA). Volume 1 contains the assessment of the potential environmental impacts for licensing the construction and operation of a proposed gaseous centrifuge enrichment facility to be built in Claiborne Parish, Louisiana, by Louisiana Energy Services, LP. (LES). The proposed facility would have a production capacity of about 866 metric tons annually of up to 5 weight percent enriched UF{sub 6}, using a proven centrifuge technology. Included in the assessment are construction, both normal operations and potential accidents (internal and external events), and the eventual decontamination and decommissioning (D&D)- of the site. Issues addressed include the purpose and need for the facility, the alternatives to the proposed action, potential disposition of the tails, the site selection process, and environmental justice. The NRC staff concludes that the facility can be constructed and operated with small and acceptable impacts on the public and the environment. The FEIS supports issuance of a license to the applicant, Louisiana Energy Services, to authorize construction and operation of the proposed facility.

  5. Final Environmental Impact Statement for the Treatment and Management of Sodium-Bonded Spent Nuclear Fuel

    SciTech Connect

    N /A

    2000-08-04

    DOE is responsible for the safe and efficient management of its sodium-bonded spent nuclear fuel. This fuel contains metallic sodium, a highly reactive material; metallic uranium, which is also reactive; and in some cases, highly enriched uranium. The presence of reactive materials could complicate the process of qualifying and licensing DOE's sodium-bonded spent nuclear fuel inventory for disposal in a geologic repository. Currently, more than 98 percent of this inventory is located at the Idaho National Engineering and Environmental Laboratory (INEEL), near Idaho Falls, Idaho. In addition, in a 1995 agreement with the State of Idaho, DOE committed to remove all spent nuclear fuel from Idaho by 2035. This EIS evaluates the potential environmental impacts associated with the treatment and management of sodium-bonded spent nuclear fuel in one or more facilities located at Argonne National Laboratory-West (ANL-W) at INEEL and either the F-Canyon or Building 105-L at the Savannah River Site (SRS) near Aiken, South Carolina. DOE has identified and assessed six proposed action alternatives in this EIS. These are: (1) electrometallurgical treatment of all fuel at ANL-W, (2) direct disposal of blanket fuel in high-integrity cans with the sodium removed at ANL-W, (3) plutonium-uranium extraction (PUREX) processing of blanket fuel at SRS, (4) melt and dilute processing of blanket fuel at ANL-W, (5) melt and dilute processing of blanket fuel at SRS, and (6) melt and dilute processing of all fuel at ANL-W. In addition, Alternatives 2 through 5 include the electrometallurgical treatment of driver fuel at ANL-W. Under the No Action Alternative, the EIS evaluates both the continued storage of sodium-bonded spent nuclear fuel until the development of a new treatment technology or direct disposal without treatment. Under all of the alternatives, the affected environment is primarily within 80 kilometers (50 miles) of spent nuclear fuel treatment facilities. Analyses indicate

  6. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix D: Cultural Resources.

    SciTech Connect

    Columbia River System Operation Review

    1995-11-01

    This study attempts to identify and analyze the impacts of the System Operating Strategy (SOS) alternatives on cultural resources. The impacts include effects on Native American traditional cultural values, properties and practices. They also include effects on archeological or historic properties meeting the criteria of the National Register of Historic Places. In addition to responding to the requirements of the National Environmental Policy Act (NEPA), this analysis addresses the requirements of the National Historic Preservation Act (NHPA), the Archeological Resources Protection Act (ARPA), the Native American Graves Protection and Repatriation Act (NAGPRA), the Native American Religious Freedom Act (NARFA), and other relevant legislation. To meet their legally mandated cultural resources requirements, the SOR agencies will develop agreements and Implementation Plans with the appropriate State Historic Preservation Officers (SHPOs), Tribes, and the Advisory Council on Historic Preservation (ACHP) detailing the measures necessary to best manage the resource. The planning and implementation activities will be staged over a number of years in consultation with affected Tribes.

  7. BPA/Puget Power Northwest Washington Transmission Project Final Environmental Impact Statement.

    SciTech Connect

    United States. Bonneville Power Administration.

    1995-08-01

    Bonneville Power Administration (BPA) and Puget Sound Power & Light Company (Puget Power) propose to upgrade the existing high-voltage transmission system in the Whatcom and Skagit counties area between the towns of Custer and Sedro Woolley, including some areas within the City of Bellingham, starting in 1995. A Draft Environmental Impact Statement (DEIS) for the project was issued in November 1993, followed by a 45-day public comment period. Public response to the DEIS included the identification of several new transmission route alternatives in the Lake Whatcom area. BPA issued a Supplemental DEIS in April 1995 to provide a second public review-and-comment period. Rebuilding an existing 230-kV line to a double-circuit 230-kV transmission line was identified in the Supplemental DEIS as the Proposed Action. The Supplemental DEIS also examined in detail a North Shore Road alternative which was proposed by some members of the public. Public comments on the EIS were listed and responded to in the Supplemental DEIS. In May 1995, a second set of open houses and public meetings was held to review the Supplemental DEIS. Electromagnetic field (EMF) effects raised as an issue in the DEIS continued to be an issue of public concern in the meetings. The EIS has identified impacts that would generally be classified as low to moderate and localized. Effects on soils and water resources in sensitive areas (e.g., near Lake Whatcom) would be low to moderate; there would be little change in magnetic fields; noise levels would remain at existing levels; and land use and property value impacts would be minimal. Threatened and endangered species would not be adversely affected, and all proposed actions in wetlands would be covered by a Corps of Engineers Nationwide Permit. Visual and socioeconomic would be low to moderate. There would be no effect on cultural resources.

  8. 75 FR 17763 - National Park Service Benefits-Sharing Final Environmental Impact Statement Record of Decision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-07

    .... This Environmentally Preferred Alternative has three considerations regarding the disclosure of... impairment of park resources and values, a listing of measures to minimize environmental harm, and...

  9. Final Site-Wide Environmental Impact Statement for the Y-12 National Security Complex

    SciTech Connect

    N /A

    2001-11-02

    The National Nuclear Security Administration (NNSA) a separately organized agency within the U.S. Department of Energy (DOE) is responsible for providing the Nation with nuclear weapons and ensuring that those nuclear weapons remain safe, secure, and reliable. As one of the DOE major production facilities, the Y-12 National Security Complex has been DOE's primary site for enriched uranium processing and storage, and one of the manufacturing facilities for maintaining the U.S. nuclear weapons stockpile. In response to the end of the Cold War and changes in the world's political regimes, the emphasis of the U.S. weapons program has shifted dramatically over the past few years from developing and producing new weapons to dismantlement and maintenance of a smaller, enduring stockpile. The ''Stockpile Stewardship and Management Programmatic Environmental Impact Statement'' [SSM PEIS], DOE/EIS-0236, issued in September 1996, evaluated alternatives for maintaining the safety and reliability of the nuclear weapons stockpile without underground nuclear testing or production of new-design weapons. In the SSM PEIS Record of Decision (ROD), DOE decided to maintain the national security missions at the Y-12 National Security Complex, but to downsize Y-12 consistent with reduced requirements. These national security missions include (1) maintaining the capability and capacity to fabricate secondaries, limited life components, and case parts for nuclear response; (2) evaluating components and subsystems returned from the stockpile; (3) storing enriched uranium that is designated for national security purposes; (4) storing depleted uranium and lithium parts; (5) dismantling nuclear weapons secondaries returned from the stockpile; (6) processing uranium and lithium (which includes chemical recovery, purification, and conversion of enriched uranium and lithium to a form suitable for long-term storage and/or further use); and (7) providing support to weapons laboratories. During the

  10. Secondary materials: Engineering properties, environmental consequences, and social and economic impacts. Final report

    SciTech Connect

    Breslin, V.; Reaven, S.; Schwartz, M.; Swanson, L.; Zweig, M.; Bortman, M.; Schubel, J.

    1993-08-01

    This report investigates two secondary materials, plastic lumber made from mixed plastic waste, and cement blocks and structures made with incinerator ash. Engineering properties, environmental impacts, and energy costs and savings of these secondary materials are compared to standard lumber products and cement blocks. Market capacity and social acceptance of plastic lumber and stabilized ash products are analyzed. These secondary materials apparently have potential markets; however, their economic value is primarily that they will not take up landfill space. For plastic lumber and stabilized incinerator ash products, marine and highway construction seem ideal public works applications. Incinerator ash may be suitable to use in seawalls, jetties, fishing reefs, highway barriers, and roadbed applications. Docks, piers, highway sound barriers, parking stops, and park furniture may all be made from plastic lumber. To encourage public acceptance and improve the market potential of secondary materials, these activities could be beneficial: industry should emphasize developing useful, long-lived products; industry and governments should create product performance criteria; government should provide rigorous testing and demonstration programs; and government and industry should cooperate to improve public outreach and educational programs.

  11. Reducing environmental noise impacts: A USAREUR noise-management program handbook. Final report

    SciTech Connect

    Feather, T.D.; Shekell, T.K.

    1991-06-01

    Noise pollution is a major environmental problem faced by the U.S. Army in Europe. Noise-related complaints from German citizens can escalate into intense political issues in German communities. This in turn hampers efficient operation of military training and often times threatens the Army's mission. In order to remedy these problems, USAREUR has developed a noise management program. A successful noise management program will limit the impact of unavoidable noise on the populace. This report, a component of the noise management program, is a reference document for noise management planning. It contains guidelines and rules-of-thumb for noise management. This document contains procedures which operation and training level personnel can understand and apply in their day to day noise management planning. Noise mitigation tips are given. Basic technical information that will aid in understanding noise mitigation is provided along with noise management through land use planning. Noise management for specific components of the military community, (airfields, base operations, training areas, and housing and recreation areas) are addressed. The nature of noise generated, means of noise abatement at the source, path, and receiver (both physical and organizational/public relations methods), and a case study example are described.

  12. Burlington Bottoms Wildlife Mitigation Project. Final Environmental Assessment/Management Plan and Finding of No Significant Impact.

    SciTech Connect

    Not Available

    1994-12-01

    Bonneville Power Administration (BPA) proposes to fund wildlife management and enhancement activities for the Burlington bottoms wetlands mitigation site. Acquired by BPA in 1991, wildlife habitat at Burlington bottoms would contribute toward the goal of mitigation for wildlife losses and inundation of wildlife habitat due to the construction of Federal dams in the lower Columbia and Willamette River Basins. Target wildlife species identified for mitigation purposes are yellow warbler, great blue heron, black-capped chickadee, red-tailed hawk, valley quail, spotted sandpiper, wood duck, and beaver. The Draft Management Plan/Environmental Assessment (EA) describes alternatives for managing the Burlington Bottoms area, and evaluates the potential environmental impacts of the alternatives. Included in the Draft Management Plan/EA is an implementation schedule, and a monitoring and evaluation program, both of which are subject to further review pending determination of final ownership of the Burlington Bottoms property.

  13. Final environmental impact statement/report. Volume 2. Technical studies. Northeast corridor improvement project electrification: New Haven, CT to Boston, MA

    SciTech Connect

    1994-10-01

    This document is the final environmental impact statement and final environmental impact report (FEIS/R) on the proposal by the National Railroad Passenger Corporation (Amtrak) to complete the electrification of the Northeast Corridor main line by extending electric traction from New Haven, CT, to Boston, MA. This document (Volume II) presents additional technical studies to supplement Volume III of the DEIS/R issued in October 1993 (PB94-111838).

  14. Final Environmental Impact Statement for the JEA Circulating Fluidized Bed Combustor Project

    SciTech Connect

    N /A

    2000-06-30

    This EIS assesses environmental issues associated with constructing and demonstrating a project that would be cost-shared by DOE and JEA (formerly the Jacksonville Electric Authority) under the Clean Coal Technology Program. The project would demonstrate circulating fluidized bed (CFB) combustion technology at JEA's existing Northside Generating Station in Jacksonville, Florida, about 9 miles northeast of the downtown area of Jacksonville. The new CFB combustor would use coal and petroleum coke to generate nearly 300 MW of electricity by repowering the existing Unit 2 steam turbine, a 297.5-MW unit that has been out of service since 1983. The proposed project is expected to demonstrate emission levels of sulfur dioxide (SO{sub 2}), oxides of nitrogen (NO{sub x}), and particulate matter that would be lower than Clean Air Act limits while at the same time producing power more efficiently and at less cost than conventional coal utilization technologies. At their own risk, JEA has begun initial construction activities without DOE funding. Construction would take approximately two years and, consistent with the original JEA schedule, would be completed in December 2001. Demonstration of the proposed project would be conducted during a 2-year period from March 2002 until March 2004. In addition, JEA plans to repower the currently operating Unit 1 steam turbine about 6 to 12 months after the Unit 2 repowering without cost-shared funding from DOE. Although the proposed project consists of only the Unit 2 repowering, this EIS analyzes the Unit 1 repowering as a related action. The EIS also considers three reasonably foreseeable scenarios that could result from the no-action alternative in which DOE would not provide cost-shared funding for the proposed project. The proposed action, in which DOE would provide cost-shared finding for the proposed project, is DOE's preferred alternative. The EIS evaluates the principal environmental issues, including air quality, traffic

  15. Environmental impacts of ocean disposal of CO{sub 2}. Final report volume 2, September 1994--August 1996

    SciTech Connect

    Herzog, H.J.; Adams, E.E.

    1996-12-01

    One option to reduce atmospheric CO{sub 2} levels is to capture and sequester power plant CO{sub 2}. Commercial CO{sub 2} capture technology, though expensive, exists today. However, the ability to dispose of large quantities of CO{sub 2} is highly uncertain. The deep ocean is one of only a few possible CO{sub 2} disposal options (others are depleted oil and gas wells or deep, confined aquifers) and is a prime candidate because the deep ocean is vast and highly unsaturated in CO{sub 2}. Technically, the term `disposal` is really a misnomer because the atmosphere and ocean eventually equilibrate on a time scale of 1000 years regardless of where the CO{sub 2} is originally discharged. However, peak atmospheric CO{sub 2} concentrations expected to occur in the next few centuries could be significantly reduced by ocean disposal. The magnitude of this reduction will depend upon the quantity of CO{sub 2} injected in the ocean, as well as the depth and location of injection. Ocean disposal of CO{sub 2} will only make sense if the environmental impacts to the ocean are significantly less than the avoided impacts of atmospheric release. In this project, we examined these ocean impacts through a multi-disciplinary effort designed to summarize the current state of knowledge. In the process, we have developed a comprehensive method to assess the impacts of pH changes on passive marine organisms. This final report addresses the following six topics: CO{sub 2} loadings and scenarios, impacts of CO{sub 2} transport, near-field perturbations, far-field perturbations, environmental impacts of CO{sub 2} release, and policy and legal implications of CO{sub 2} release.

  16. 76 FR 60815 - Final Legislative Environmental Impact Statement (LEIS) for the Limestone Hills Training Area...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-30

    ... environmental analysis is resource dependent. It includes Lewis and Clark County and Broadwater County for... resources. The LEIS analyzes potential environmental effects of three action alternatives and a No Action... Graymont Western's Indian Creek Limestone Mine to extract and process ore within the LHTA; (2)...

  17. 76 FR 13429 - Notice of Availability of Final Environmental Impact Statement for the Proposed Blackfoot Bridge...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-11

    ... Blackfoot Bridge Mine, Caribou County, ID AGENCY: Bureau of Land Management, Interior. ACTION: Notice of... proposed Blackfoot Bridge Mine. DATES: The Final EIS is now available for public review. The BLM Record of... Bridge Mine Final EIS are available in the BLM Pocatello Field Office at the following address: 4350...

  18. 76 FR 55723 - Final Supplemental Environmental Impact Statement, Sequoyah Nuclear Plant Units 1 and 2 License...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-08

    ... (SQN) in Soddy-Daisy, Tennessee. A notice of availability (NOA) of the Sequoyah License Renewal Final... Protection Agency (USEPA) published the NOA for the Draft SEIS in the Federal Register on November 5, 2010... considering and responding to all substantive comments, TVA completed and issued the Final SEIS. The NOA...

  19. Final environmental assessment and Finding-of-No-Significant-Impact - drum storage facility for interim storage of materials generated by environmental restoration operations

    SciTech Connect

    Not Available

    1994-09-01

    The Department of Energy (DOE) has prepared an Environmental Assessment (EA), DOE/EA-0995, for the construction and operation of a drum storage facility at Rocky Flats Environmental Technology Site, Golden, Colorado. The proposal for construction of the facility was generated in response to current and anticipated future needs for interim storage of waste materials generated by environmental restoration operations. A public meeting was held on July 20, 1994, at which the scope and analyses of the EA were presented. The scope of the EA included evaluation of alternative methods of storage, including no action. A comment period from July 5, 1994 through August 4, 1994, was provided to the public and the State of Colorado to submit written comment on the EA. No written comments were received regarding this proposed action, therefore no comment response is included in the Final EA. Based on the analyses in the EA, DOE has determined that the proposed action would not significantly affect the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA). Therefore, preparation of an Environmental Impact Statement is not required and the Department is issuing this Finding of No Significant Impact.

  20. 76 FR 63923 - Notice of Availability To Distribute a Final Environmental Impact Statement (FEIS) for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-14

    ... of sustainable design through the Leadership in Energy and Environmental Design Green Building Rating... to construct and operate a larger and improved LPOE which meets their needs and the design...

  1. 76 FR 28964 - Notice of Availability of Record of Decision for the Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-19

    ... conduct Navy training activities within the Temporary Maritime Activities Area within the Gulf of Alaska... Populations and Low Income Populations and EO 13045, Protection of Children from Environmental Health...

  2. 76 FR 12096 - McCloud-Pit Project; Notice of Availability of the Final Environmental Impact Statement for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-04

    ... Energy Regulatory Commission McCloud-Pit Project; Notice of Availability of the Final Environmental... reviewed the application for license for the McCloud-Pit Hydroelectric Project (FERC No. 2106), located on the McCloud and Pit Rivers in Shasta County, California and has prepared a final environmental...

  3. 75 FR 19422 - Availability of a Final Environmental Impact Statement for the General Management Plan (FEIS/GMP...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-14

    ... Planning) and Director's Order Number 12 (Conservation Planning, Environmental Impact Analysis, and... resources; water quality; floodplains; soils; vegetation and wetlands; wildlife; special status species...

  4. Final Environmental Impact Statement, ’Dredge River Channel: Naval Submarine Base, New London, Groton, Connecticut’. Supplement. Volume 3.

    DTIC Science & Technology

    WASTE DISPOSAL, *DREDGING, *SPOIL, *ENVIRONMENTAL IMPACT STATEMENTS, MARINE BIOLOGY, RIVERS, CONNECTICUT, WATER QUALITY, OCEAN ENVIRONMENTS, SEDIMENTS, HARBORS, CHANNELS(WATERWAYS), TURBIDITY, ESTUARIES, LONG ISLAND SOUND .

  5. Final programmatic environmental impact statement for the uranium mill tailings remedial action ground water project. Volume I

    SciTech Connect

    1996-10-01

    This programmatic environmental impact statement (PElS) was prepared for the Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project to comply with the National Environmental Policy Act (NEPA). This PElS provides an analysis of the potential impacts of the alternatives and ground water compliance strategies as well as potential cumulative impacts. On November 8, 1978, Congress enacted the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law, codified at 42 USC §7901 et seq. Congress found that uranium mill tailings " ... may pose a potential and significant radiation health hazard to the public, and that every reasonable effort should be made to provide for stabilization, disposal, and control in a safe, and environmentally sound manner of such tailings in order to prevent or minimize other environmental hazards from such tailings." Congress authorized the Secretary of Energy to designate inactive uranium processing sites for remedial action by the U.S. Department of Energy (DOE). Congress also directed the U.S. Environmental Protection Agency (EPA) to set the standards to be followed by the DOE for this process of stabilization, disposal, and control. On January 5, 1983, EPA published standards (40 CFR Part 192) for the disposal and cleanup of residual radioactive materials. On September 3, 1985, the U.S. Court of Appeals for the Tenth Circuit set aside and remanded to EPA the ground water provisions of the standards. The EPA proposed new standards to replace remanded sections and changed other sections of 40 CFR Part 192. These proposed standards were published in the Federal Register on September 24, 1987 (52 FR 36000). Section 108 of the UMTRCA requires that DOE comply with EPA's proposed standards in the absence of final standards. The Ground Water Project was planned under the proposed standards. On January 11, 1995, EPA published the final rule, with which the DOE must now comply. The PElS and the Ground Water Project are in

  6. 77 FR 61631 - Final Environmental Impact Statement for Stehekin River Corridor Implementation Plan, Lake Chelan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-10

    ..., maintenance yard) in response to increased flooding and erosion issues in the lower Stehekin River watershed... erosion threats to NPS facilities and are impacting natural resources within Lake Chelan NRA. The three...

  7. Final Environmental Impact Statement. Second KC-135R Air Refueling Squadron, Malmstrom Air Force Base, Montana

    DTIC Science & Technology

    1989-07-01

    significant because of the damage caused by I continued hard mobile launcher operations. The concurrent deployment of the Proposed Action with the...Short duration impacts are transitory effects of the proposed I program that are generally caused by construction activities or operations start-up...from actions that continue over a long period of time). However, long-duration impacts can also be caused by construction activities if a resource is

  8. 10 CFR 51.97 - Final environmental impact statement-materials license.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act... sections 141 (c), (d), and (e) and 148 (a) and (c) of the Nuclear Waste Policy Act of 1982, as amended... enrichment facility. As provided in section 5(e) of the Solar, Wind, Waste, and Geothermal Power...

  9. 77 FR 65401 - Notice of Availability of the Final Environmental Impact Statement for the Restoration Design...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-26

    .../st/en/prog/energy/arra_solar.htm . All protests must be in writing and mailed to one of the following... development, including solar and wind energy technologies, and to establish a baseline set of environmental... (REDAs), which are BLM-administered lands that are suitable for the development of solar and wind energy...

  10. 76 FR 27083 - Notice of Availability of the Final Environmental Impact Statement for the Yesler Terrace...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-10

    ... and market-rate housing, office and retail uses, as well as parks and open space, enhanced landscaping... Terrace Community Center); 6.5 acres of public open space; 9.4 acres of semi- private and private open space; and 5,100 parking spaces within or under buildings. The FEIS evaluates the environmental...

  11. 75 FR 69700 - Final Environmental Impact Statement and Cape Hatteras National Seashore Off-Road Vehicle...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-15

    ... Statement and Cape Hatteras National Seashore Off-Road Vehicle Management Plan AGENCY: National Park Service... National Seashore Off-Road Vehicle Management Plan. SUMMARY: Pursuant to the National Environmental Policy... (Seashore) Off-Road Vehicle Management Plan (Plan/ FEIS). The Plan/FEIS will enable NPS to develop...

  12. 78 FR 32686 - Final Supplemental Environmental Impact Statement on the Issuance of Annual Regulations...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-31

    ... regulatory process. (2) Frequency of review and adoption of duck regulatory packages. Duck regulatory packages are the set of framework regulations that apply to the general duck hunting seasons. Packages... final SEIS, we present two alternatives regarding how frequently duck regulatory packages should be...

  13. 77 FR 19317 - Notice of Availability of the Final Supplemental Environmental Impact Statement and Record of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-30

    ... leave a message or question with the above individual. You will receive a reply during normal business... area and the need for additional public input. The Final Supplemental EIS/ROD selects the Preferred... (botanical, water, paleontological, and earth). Comments on the Draft Supplemental EIS received from the...

  14. 77 FR 46516 - Notice of Availability of the Final Environmental Impact Statement, Including a Programmatic...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-03

    ... Programmatic Agreement, for the Clark, Lincoln, and White Pine Counties Groundwater Development Project, Nevada... Groundwater Development Project (SNWA Project), and by this notice is announcing the availability of the Final... system of groundwater conveyance and treatment facilities in southeastern Nevada which would transport...

  15. 75 FR 60089 - Final Environmental Impact Statement (EIS) Addressing Campus Development at Fort Meade

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-29

    ... . Additional copies of the Final EIS are available at the Fort Meade Main Post Library, 4418 Llewellyn Avenue, Fort Meade, MD 20755; the Anne Arundel County Public Library North County Area Branch, 1010 Eastway, Glen Burnie, MD 21060; and the Anne Arundel County Public Library West County Area Branch, 1325...

  16. 10 CFR 51.92 - Supplement to the final environmental impact statement.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... combined license for the construction and operation of a nuclear power plant as described in the combined... permit; (3) Contain no separate discussion of alternative sites; (4) Include an analysis of the economic... costs; (5) Include an analysis of other energy alternatives, to the extent that the final...

  17. 77 FR 16558 - General Management Plan/Final Environmental Impact Statement, Hampton National Historic Site...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-21

    ... feeling of the Hampton Estate near the end of its period of greatest significance (mid to late 19th..., Maryland 21286. Fort McHenry National and Historic Shrine, End of East Fort Avenue, Baltimore, Maryland... Final GMP/EIS will be followed by a no-action period that will end no sooner than 30 days from the date...

  18. 78 FR 28873 - Availability of Final Environmental Assessment and Finding of No Significant Impact for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ... for the Proposed Modification of the Bayonne Bridge Across the Kill Van Kull Between Bayonne, Hudson... the proposed modification of the historic Bayonne Bridge across the Kill Van Kull between Bayonne, New... Bridge across the Kill Van Kull. ADDRESSES: We have provided a copy of the Final EA and FONSI in...

  19. Final Environmental Impact Statement (EIS) for the Space Nuclear Thermal Propulsion (SNTP) Program. Sanitized Version

    DTIC Science & Technology

    1991-09-19

    ground testing activities. The radioactive emissions would be reduced to a level that is consistent with the current as low as reasonably achievable...than PBR systems. The relatively low weight of the PBR propulsion system allows the design of a rocket that is approximately the size of the current ...environmental standards should not be met", and that ptntial national benefits from fl technology extend beyond its current application to a (Shea, 1991). i

  20. 77 FR 12076 - Final Programmatic Environmental Impact Statement and Integrated Water Resource Management Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-28

    ... of Reclamation (Reclamation), in cooperation with the Washington State Department of Ecology (Ecology... In response to long-standing water resource problems in the basin, Reclamation and Ecology have... impacts that could occur if Reclamation and Ecology implement the comprehensive program of water resource...

  1. U.S. Lake Erie Natural Gas Resource Development. Final Programmatic Environmental Impact Statement

    DTIC Science & Technology

    1982-03-01

    1-7 -accidents.................................................... 1- ht. Problems related to seismic activityli and lake ice...for offshore gas development caused by regional seismic activity (earth tremors or quakes) or Lake Erie ice (i) Potential significant impacts from...interpretation of existing seismic data or collection and interpretation of new data in addi- tion to on-structure exploratory drilling. Lockport reefs

  2. 75 FR 49515 - Notice of Availability of the Final Environmental Impact Statement for the Chevron Energy...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-13

    ... Chevron Energy Solutions Lucerne Valley Solar Project, California and the Proposed Amendment to the... Impact Statement (EIS) for the Chevron Energy Solutions Lucerne Valley Solar Project and by this notice...-of-way (ROW) authorization from the BLM for the CES Lucerne Valley Solar Project, consisting of...

  3. 75 FR 27812 - Final Environmental Impact Statement for the General Management Plan; Harpers Ferry National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-18

    ... resources over the next 20 years. Impact topics addressed were cultural resources, natural resources... park would be connected by an auto tour and round-the-park trail system. The existing transportation... manage the historic Shipley School. Alternative 3 would provide increased connections with private...

  4. 75 FR 51479 - Notice of Availability of the Final Environmental Impact Statement for the Chevron Energy...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-20

    ... Chevron Energy Solutions/Solar Millennium Blythe Solar Power Plant and Proposed California Desert... Impact Statement (EIS) for the Chevron Energy Solutions/Solar Millennium (CESSM), LLC's Blythe Solar... CDCA Plan to allow other solar energy power generation projects on the project site and (2) a no action...

  5. 75 FR 44981 - Notice of Availability of the Final Environmental Impact Statement for Vegetation Treatments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-30

    ... Treatments Using Herbicides on Bureau of Land Management Lands in Oregon AGENCY: Bureau of Land Management... Impact Statement (EIS) for Vegetation Treatments Using Herbicides on Bureau of Land Management lands in... herbicides currently in use on BLM- managed lands in Oregon and increase the number of objectives for...

  6. Final environmental impact assessment of the Paducah Gaseous Diffusion Plant site, Paducah, Kentucky

    SciTech Connect

    Not Available

    1982-08-01

    This document considers: the need for uranium enrichment facilities; site location; plant description; and describes the power generating facilities in light of its existing environment. The impacts from continuing operations are compared with alternatives of shutdown, relocation, and alternative power systems. (PSB)

  7. 76 FR 29217 - Notice of Availability of the Final Programmatic Environmental Impact Statement for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-20

    ... Impact Statement for the Mechanical and Artificial Creation and Maintenance of Emergent Sandbar Habitat... Artificial Creation and Maintenance of Emergent Sandbar Habitat on the Riverine Segments of the Upper... the mechanical and artificial construction of ESH in the riverine segments of the Upper Missouri...

  8. 78 FR 4134 - Availability of the Draft Finding of No Significant Impact and Final Programmatic Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-18

    ... action under which the Army's active duty end-strength would be reduced from 562,000 at the end of FY..., reduced from an FY 2012 authorized end strength of 562,000 to 490,000. Reductions in Army Soldiers will...'s end-strength. Force realignment and some level of force reduction will impact most major...

  9. Final Environmental Impact Statement for National Aeronauties and Space Administration Office of Space Science

    DTIC Science & Technology

    2007-11-02

    1973. (30) Rice, E. E., "Propellant and Exhaust Product Composition Data for 14 NASA Sounding Rockets", Battelle-Columbus Laboratories Report No. BMI -SG...Appendix F. The EPA comments are incorporated into the body of the greatly revised statement. 6. Draft Statement published April 21, 1971. Final Statement...E-1 APPENDIX F. COMMENTS ON DRAFT STATEMENT BY EPA AND PETER HUNT ASSOCIATES. . . . . . . . . . . . . . . . . . F-1 LIST OF FIGURES FIGURE 1

  10. 78 FR 69873 - Notice of Availability of the Record of Decision and Final Supplemental Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-21

    ... June 8, 2010, Ruby Pipeline Biological Opinion (BiOp). The Revised BiOp was published on July 5, 2013..., Final Supplemental EIS, and Revised BiOp were developed in response to an order from the 9th U.S... entities, filed petitions for review of the 2010 BiOp and the BLM's ROD in the 9th U.S. Circuit Court...

  11. Klondike III/Biglow Canyon Wind Integration Project; Final Environmental Impact Statement, September 2006.

    SciTech Connect

    United States. Bonneville Power Administration

    2006-09-01

    BPA has been asked by PPM Energy, Inc. to interconnect 300 megawatts (MW) of electricity generated from the proposed Klondike III Wind Project to the Federal Columbia River Transmission System. Orion Energy LLC has also asked BPA to interconnect 400 MW of electricity from its proposed Biglow Canyon Wind Farm, located north and east of the proposed Klondike III Wind Project. (Portland General Electric recently bought the rights to develop the proposed Biglow Canyon Wind Farm from Orion Energy, LLC.) Both wind projects received Site Certificates from the Oregon Energy Facility Siting Council on June 30, 2006. To interconnect these projects, BPA would need to build and operate a 230-kV double-circuit transmission line about 12 miles long, expand one substation and build one new substation. The wind projects would require wind turbines, substation(s), access roads, and other facilities. Two routes for the transmission line are being considered. Both begin at PPM's Klondike Schoolhouse Substation then travel north (Proposed Action) or north and westerly (Middle Alternative) to a new BPA 230-kV substation next to BPA's existing John Day 500-kV Substation. BPA is also considering a No Action Alternative in which BPA would not build the transmission line and would not interconnect the wind projects. The proposed BPA and wind projects would be located on private land, mainly used for agriculture. If BPA decides to interconnect the wind projects, construction of the BPA transmission line and substation(s) could commence as early as the winter of 2006-07. Both wind projects would operate for much of each year for at least 20 years. The proposed projects would generally create no or low impacts. Wildlife resources and local visual resources are the only resources to receive an impact rating other than ''none'' or ''low''. The low to moderate impacts to wildlife are from the expected bird and bat mortality and the cumulative impact of this project on wildlife when combined with

  12. Final Long-Term Management and Storage of Elemental Mercury Environmental Impact Statement Summary and Guide for Stakeholders

    SciTech Connect

    Not Available

    2011-01-01

    Pursuant to the Mercury Export Ban Act of 2008 (P.L. 110-414), DOE was directed to designate a facility or facilities for the long-term management and storage of elemental mercury generated within the United States. Therefore, DOE has analyzed the storage of up to 10,000 metric tons (11,000 tons) of elemental mercury in a facility(ies) constructed and operated in accordance with the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act (74 FR 31723). DOE prepared this Final Mercury Storage EIS in accordance with the National Environmental Policy Act of 1969 (NEPA), as amended (42 U.S.C. 4321 et seq.), the Council on Environmental Quality (CEQ) implementing regulations (40 CFR 1500–1508), and DOE’s NEPA implementing procedures (10 CFR 1021) to evaluate reasonable alternatives for a facility(ies) for the long-term management and storage of elemental mercury. This Final Mercury Storage EIS analyzes the potential environmental, human health, and socioeconomic impacts of elemental mercury storage at seven candidate locations: Grand Junction Disposal Site near Grand Junction, Colorado; Hanford Site near Richland, Washington; Hawthorne Army Depot near Hawthorne, Nevada; Idaho National Laboratory near Idaho Falls, Idaho; Kansas City Plant in Kansas City, Missouri; Savannah River Site near Aiken, South Carolina; and Waste Control Specialists, LLC, site near Andrews, Texas. As required by CEQ NEPA regulations, the No Action Alternative was also analyzed as a basis for comparison. DOE intends to decide (1) where to locate the elemental mercury storage facility(ies) and (2) whether to use existing buildings, new buildings, or a combination of existing and new buildings. DOE’s Preferred Alternative for the long-term management and storage of mercury is the Waste Control Specialists, LLC, site near Andrews, Texas.

  13. F-22 Aircraft Force Development Evaluation and Weapons School Beddown, Final Environmental Impact Statement

    DTIC Science & Technology

    1999-10-01

    environmental justice guidelines since the proportion of minority and low-income people within the affected area are higher than the proportion in the county. The Air Force will continue to employ noise abatement procedures to reduce noise effects in the surrounding communities and assist local officials who seek to establish or modify noise attenuation measures for residences. For Nellis Air Force Range and the encompassing NRC, flight and ordnance delivery activities proposed for the F-22s would have negligible changes to current conditions.

  14. Final Environmental Impact Statement for Proposed White Elk Military Operations Area, Hill Air Force Base, Utah

    DTIC Science & Technology

    2011-04-01

    tourism industry. The Elko County Board of Commissioners expressed concern that the proposal would impact the local economy through land restrictions...including darkness at night. Use of night vision goggles and other technology support nighttime operations so pilots must practice to employ these...commercial tourism activities. The Commissioner’s office also expressed concern about the amount of already restricted airspace and the current activities

  15. Final Environmental Impact Statement. F-15E Beddown at Seymour Johnson AFB, North Carolina

    DTIC Science & Technology

    1988-11-18

    which firelighters illegally kill deer at night. We believe that a potential I for laser safety regarding wildlife, especially those species which may be...during daylight hours, aerial observation of deer firelighters at night is one of the most efficient techniques for 114 detection and apprehension...affect our ability to accomplish our mission. The i DEIS should address impacts on enforcement flights for detection and apprehension of firelighters as

  16. Tonawanda Creek, Genesee County, New York, Regional Flood Control. Final Environmental Impact Statement.

    DTIC Science & Technology

    1981-11-01

    several hours. Turbidity and 3uspended solids concentrations lower than those necessary to cause death or physiological injury may also produce other...water, DC proved to be more effective since the fish were attracted to the anode and could be seen and captured by the netters . One person carried the...intermittent flooding. Teskey and Hinckley (1977)1/ give a good review of both short-term and long-term impacts of flooding on vegetation. Physiological

  17. Washington Wildlife Mitigation Projects : Final Programmatic Environmental Assessment and Finding of No Significant Impact.

    SciTech Connect

    United States. Bonneville Power Administration; Washington . Dept. of Fish and Wildlife.

    1996-08-01

    Bonneville Power Administration (BPA) proposes to fund the portion of the Washington Wildlife Mitigation Agreement (Agreement) pertaining to wildlife habitat mitigation projects to be undertaken in a cooperative effort with the Washington Department of Fish and Wildlife (WDFW). This Agreement serves to establish a monetary budget funded by BPA for projects proposed by Washington Wildlife Coalition members and approved by BPA to protect, mitigate, and improve wildlife and/or wildlife habitat within the State of Washington that has been affected by the construction of Federal dams along the Columbia River. This Environmental Assessment examines the potential environmental effects of acquiring and/or improving wildlife habitat within five different project areas. These project areas are located throughout Grant County and in parts of Okanogan, Douglas, Adams, Franklin, Kittias, Yakima, and Benton Counties. The multiple projects would involve varying combinations of five proposed site-specific activities (habitat improvement, operation and maintenance, monitoring and evaluation, access and recreation management, and cultural resource management). All required Federal, State, and tribal coordination, permits and/or approvals would be obtained prior to ground-disturbing activities.

  18. Final programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Ground Water Project. Volume 1

    SciTech Connect

    1996-04-01

    The first step in the UMTRA Ground Water Project is the preparation of this programmatic environmental impact statement (PEIS). This document analyzes the potential impacts of four alternatives for conducting the Ground Water Project. One of these alternatives is the proposed action. These alternatives do not address site-specific ground water compliance strategies because the PEIS is a planning document only. It assesses the potential programmatic impacts of conducting the Ground Water Project, provides a method for determining the site-specific ground water compliance strategies, and provides data and information that can be used to prepare site-specific environmental impacts analyses more efficiently. This PEIS differs substantially from a site-specific environmental impact statement because multiple ground water compliance strategies, each with its own set of potential impacts, could be used to implement all the alternatives except the no action alternative. In a traditional environmental impact statement, an impacts analysis leads directly to the defined alternatives. The impacts analysis for implementing alternatives in this PEIS first involves evaluating a ground water compliance strategy or strategies, the use of which will result in site-specific impacts. This PEIS impacts analysis assesses only the potential impacts of the various ground water compliance strategies, then relates them to the alternatives to provide a comparison of impacts.

  19. Final Environmental Impact Statement, Rehabilitation of Locks and Dam Number 1, Minneapolis, Minnesota.

    DTIC Science & Technology

    1978-07-01

    AVEn NO.LI MINN INNTAPOLIS-ST. 1PA INTNTAAIR POR DULUTH YPVL( MS IH.K " IOWA Fiur 1. Loato ofLoksanDrnNo W2 A-Z OW LOE mEIM .3 3A L 92 ;6j -.C ?4- 4...Impact Statement. Operation and Maintenance 9-foot Navigation Channel. Upper Mississippi River Head of Navigation to Guttenberg, Iowa . Vol. l&2...inches in diameter and approximately 28 years old. The northern half of the island is covered mostly by grasses and wildflowers . WILDLIFE Reptiles and

  20. Preliminary Final Environmental Impact Statement for the Closure of Chanute Air Force Base

    DTIC Science & Technology

    1990-01-01

    Figure 3.1.) The City of Champaign-Urbana is approximately 14 miles south of Chanute AFB (see Figure 3.2.) 3.1.1 Climate The Chanute AFB and the Rantoul...operations have been minimal, not exceeding the noise I impact that would be expected from a medium-sized city . 3.4 Air Quality 3 3.4.1 Regional Air Quality...legal requirements. A monitoring station is located in Champaign County in the City of Champaign. This monitoring station is part of the Illinois

  1. Characterization of a fluidized-bed combustion ash to determine potential for environmental impact. Final report

    SciTech Connect

    Hassett, D.J.; Henderson, A.K.; Pflughoeft-Hassett, D.F.; Mann, M.D.; Eylands, K.E.

    1997-10-01

    A 440-megawatt, circulating fluidized-bed combustion (CFBC), lignite-fired power plant is planned for construction in Choctaw County north of Ackerman, Mississippi. This power plant will utilize Mississippi lignite from the first lignite mine in that state. Malcolm Pirnie, Inc., is working with the power plant developer in the current planning and permitting efforts for this proposed construction project. In order to accommodate Mississippi state regulatory agencies and meet appropriate permit requirements, Malcolm Pirnie needed to provide an indication of the characteristics of the by-products anticipated to be produced at the proposed plant. Since the Mississippi lignite is from a newly tapped mine and the CFBC technology is relatively new, Malcolm Pirnie contacted with the Energy and Environmental Research Center (EERC) to develop and perform a test plan for the production and characterization of ash similar to ash that will be eventually produced at the proposed power plant. The work performed at the EERC included two primary phases: production of by-products in a bench-scale CFBC unit using lignite provided by Malcolm Pirnie with test conditions delineated by Malcolm Pirnie to represent expected operating conditions for the full-scale plant; and an extensive characterization of the by-products produced, focusing on Mississippi regulatory requirements for leachability, with the understanding that return of the by-product to the mine site was an anticipated by-product management plan. The overall focus of this project was the environmental assessment of the by-product expected to be produced at the proposed power plant. Emphasis was placed on the leachability of potentially problematic trace elements in the by-products. The leaching research documented in this report was performed to determine trends of leachability of trace elements under leaching conditions appropriate for evaluating land disposal in monofills, such as returning the by-products to the mine

  2. Environmental Impact Analysis Process, Final Environmental Assessment for U.S. Air Force Quick Reaction Launch Vehicle Program

    DTIC Science & Technology

    2001-01-22

    held via telephone conference call between the USAF, NMFS, FAA and Hubbs- Sea World Research Institute (HSWRI). The purpose of the discussion was to...Journalism, University of Missouri, Columbia Twenty-four years of environmental experience 92 Subcontractor • Ann Bowles, Ph.D. — Hubbs- Sea World Research...ait-2, September 15, 1999. Report by Hubbs- Sea World Research Institute, San Diego, California, for U.S. Air Force Space and Missile Systems Center

  3. Growth in Biofuels Markets: Long Term Environmental and Socioeconomic Impacts (Final Report)

    SciTech Connect

    Seth D. Meyer; Nicholas Kalaitzandonakes

    2010-12-02

    Over the last several years increasing energy and petroleum prices have propelled biofuels and the feedstocks used to produce them, to the forefront of alternative energy production. This growth has increased the linkages between energy and agricultural markets and these changes around the world are having a significant effect on agricultural markets as biofuels begin to play a more substantial role in meeting the world's energy needs. Biofuels are alternatively seen as a means to reduce carbon emissions, increase energy independence, support rural development and to raise farm income. However, concern has arisen that the new demand for traditional commodities or alternative commodities which compete for land can lead to higher food prices and the environmental effects from expanding crop acreage may result in uncertain changes in carbon emissions as land is converted both in the US and abroad. While a number of studies examine changes in land use and consumption from changes in biofuels policies many lack effective policy representation or complete coverage of land types which may be diverted in to energy feedstock production. Many of these biofuels and renewable energy induced land use changes are likely to occur in developing countries with at-risk consumers and on environmentally sensitive lands. Our research has improved the well known FAPRI-MU modeling system which represents US agricultural markets and policies in great detail and added a new model of land use and commodity markets for major commodity producers, consumers and trade dependent and food insecure countries as well as a rest of the world aggregate. The international modules include traditional annual crop lands and include perennial crop land, pasture land, forest land and other land uses from which land may be drawn in to biofuels or renewable energy feedstock production. Changes in calorie consumption in food insecure countries from changes in renewable energy policy can also be examined with a

  4. Columbia River System Operation Review : Final Environmental Impact Statement, Main Report.

    SciTech Connect

    Columbia River System Operation Review; United States. Bonneville Power Administration; United States. Army. Corps of Engineers. North Pacific Division; United States. Bureau of Reclamation. Pacific Northwest Region.

    1995-11-01

    The System Operation Review (SOR) Final EIS addresses four actions: (a) need to develop coordinated strategy for managing the multiple uses of the Federal Columbia River system (System Operating Strategy [SOS]); (b) need to provide interested parties other than management agencies with a long-term role in system planning (Forum); (c) need to renew or change current Canadian Entitlement Allocation Agreements (CEAA); and (d) need to renegotiate and renew the Pacific Northwest Coordination Agreement (PNCA). SOS alternatives analyzed are: (1) operation prior to Endangered Species Act listings of salmon stocks; (2) current operations (no action); (3) stable storage project operation; (4) natural river operation; (5) fixed drawdown; (6) operating strategies proposed by the U.S. Fish and Wildlife Service, National Marine Fisheries Service, State fisheries agencies, Native American tribes, and Federal operating agencies; and (7) Preferred Alternative. The seven Forum alternatives analyzed are: (1) decisionmaking by the SOR lead agencies (preferred alternative); (2) decisionmaking by SOR lead agencies and recommendations by an existing regional entity; (3) decisionmaking by SOR lead agencies and recommendations by a new regional entity; (4) decisionmaking by a Federal consultation forum; (5) decisionmaking by a new entity; (6) decisionmaking by one Federal operating agency; (7) decisionmaking by a Federal agency other than an operating agency. PNCA alternatives analyzed are: (1) no replacement contract; (2) contract to maximize regional power benefits; (3) roll over existing PNCA; (4) current PNCA with modified operating procedures (preferred alternative); (5) current PNCA with nonpower modifications. CEAA alternatives include: (1) no action (no replacement of current allocation agreements); (2) entitlement allocation: 55 percent Federal; 45 percent non-Federal; (3) entitlement allocation: 70 percent Federal, 30 percent non-Federal (preferred alternative); (4) no agreement.

  5. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix D: Exhibits.

    SciTech Connect

    Columbia River System Operation Review

    1995-11-01

    The Columbia River and its tributaries are the primary water system in the Pacific Northwest, draining some 219,000 square miles in seven states and another 39,500 square miles in British Columbia. Beginning in the 1930`s, the Columbia River has been significantly modified by construction of 30 major dams on the river and its tributaries, along with dozens of non-Federal projects. Construction and subsequent operation of these water development projects have contributed to eight primary uses of the river system, including navigation, flood control, irrigation, electric power generation, fish migration, fish and wildlife habitat, recreation, and water supply and quality considerations. Increasing stress on the water development of the Columbia River and its tributaries has led primary Federal agencies to undertake intensive analysis and evaluation of the operation of these projects. These agencies are the U.S. Army Corps of Engineers and the Bureau of Reclamation, who operate the large Federal dams on the river, and the Bonneville Power Administration who sells the power generated at the dams. This review, termed the System Operation Review (SOR), has as its ultimate goal to define a strategy for future operation of the major Columbia River projects which effectively considers the needs of all river uses. This volume, Appendix D: Cultural resources appendix, Technical imput includes the following: Development of geomorphology based framework for cultural resources management, Dworshak Reservoir, Idaho; Impact profiles for SOR reservoirs; comments from the following Native American tribes: Burns Paiute Tribe; Coville Confederated Tribes; Confederated Tribes of the Warm Springs Indian Reservation; Confederated Tribes and bands of the Yakama Indian Nation (comments); Nez Perce Tribe; Coeur D`Alene Tribe; Spokane Tribe of Indians; The confederated Tribes of the Umatilla Indian Reservation.

  6. Bonneville Power Administration Fish & Wildlife Implementation Plan Final Environmental Impact Statement

    SciTech Connect

    N /A

    2003-05-09

    The Pacific Northwest has long prided itself on its bountiful and diverse natural resources--its forests and grasslands, minerals and rivers, fish and wildlife. The Region has also relied on these natural resources to serve multiple, and sometimes conflicting, uses. The independent demands of the whole spectrum of human uses (such as irrigation, municipal water supplies, grazing, fishing and hunting, electric power production, recreation, timber harvest, and transportation) have placed increasing stress on the natural resources of the Columbia River Basin. One consequence is that, over the last decade, the number of fish and wildlife species listed as endangered or threatened under the Endangered Species Act (ESA) has dramatically increased. The Region has sought to stem and even reverse the species decline. Unfortunately, after a decade of good intentions, there has been less progress than is necessary to reverse this trend. Here are the most important reasons: (1) Different groups have different value judgments about priorities, leading to different (and often conflicting) ideas about what recovery and mitigation efforts should be. (2) There is no clear and agreed-upon scientific answer to the problem. (3) Conflicting directives and jurisdictions of regional authorities have meant that funds dedicated to fish and wildlife mitigation and recovery efforts have often been used less efficiently and effectively than they otherwise could have been. Recently, regional entities have taken steps to work together to develop a comprehensive and coordinated planning approach for species recovery and mitigation. For example, over the past several years the Council's Columbia River Basin Fish and Wildlife Program, the Recommendations for the Protection and Restoration of Fish In The Columbia River Basin by the Governors of the four Northwestern States, and the Federal Caucus' Conservation of Columbia Basin Fish: Final Basinwide Salmon Recovery Strategy (Basinwide Strategy

  7. INEL Geothermal Environmental Program. Final environmental report

    SciTech Connect

    Thurow, T.L.; Cahn, L.S.

    1982-09-01

    An overview of environmental monitoring programs and research during development of a moderate temperature geothermal resource in the Raft River Valley is presented. One of the major objectives was to develop programs for environmental assessment and protection that could serve as an example for similar types of development. The monitoring studies were designed to establish baseline conditions (predevelopment) of the physical, biological, and human environment. Potential changes were assessed and adverse environmental impacts minimized. No major environmental impacts resulted from development of the Raft River Geothermal Research Facility. The results of the physical, biological, and human environment monitoring programs are summarized.

  8. Environmental Impact Study

    DTIC Science & Technology

    The Defense Advanced Research Projects Agency’s (ARPA) Environmental Impact Program is directed toward identifying those scientific and technical...facilities and techniques. These include: An Environmental Impact Prediction Facility to assist in evaluating impact on the environment and to provide a...actual Environmental Impact Prediction Facility. Also described is an effort toward identifying research needed to support future environmental impact statements

  9. Final Environmental Planning Technical Report

    DTIC Science & Technology

    1984-01-01

    AD-A267 225e i Department of the Air Force FINAL ENVIRONMENTAL JUL 1993 PLANNINGU• TECHNICAL REPORT _____________-_--_ AIR QUALITY P+prpoT d kr ptu...2922 JUL 16 󈨡 9:31 703 614 -1572 PAGE. 002’ FINAL ENVIRONMENTAL PLANNING TECHNICAL REPORT AIR QUALITY January 1984 PREFACE The President has directed...Matrix 3-33 vi 1.0 INTRODUCTION 1.0 INTRODUCTION This final environmental planning technical report (EPTR) is a companion document to the air quality

  10. Environmental law deskbook. Final report

    SciTech Connect

    1998-06-12

    JA 234 provides an overview of Environmental Law, particularly as it relates to the US Army and the Department of Defense. Chapter 1 addresses the development of the Army`s environmental program; funding, compliance, and enforcement issues associated with the program; and the Judge Advocate`s environmental role. Chapters 2--7 focus on environmental statutes that commonly impact on federal installations; specifically: The National Environmental Policy Act; The Clean Water Act; The Clean Air Act; The Endangered Species Act; The Resource Conservation and Recovery Act; and The Comprehensive Environmental Response, Compensation, and Liability Act.

  11. 77 FR 69920 - Notice of Availability of a Final Tier 1 Environmental Impact Statement, for the Chicago, IL to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-21

    ... the number of trips between Chicago and St. Louis, as well as improvements to railroad crossings... alternatives, describes the affected environment, analyzes the potential environmental impacts of all the... the Tier 1 Build Alternatives, as well as impacts of the No-Build Alternative, in order to select...

  12. 77 FR 44259 - Notice of Availability of a Final Programmatic Environmental Impact Statement and Draft Record of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-27

    ... analysis; Concern about potential impacts to transboundary areas and transboundary movement of species... the extent of public outreach conducted by CBP for the PEIS. Final PEIS After further analysis and... information derived from the analysis in the Final PEIS in management, planning, and decision-making for its...

  13. Gulf of Mexico Sales 147 and 150: Central and Western planning areas. Final environmental impact statement, Volume 1: Sections 1 through 4.C

    SciTech Connect

    Not Available

    1993-11-01

    This Final Environmental Impact Statement (EIS) covers the proposed 1994 Gulf of Mexico OCS oil and gas lease sales [Central Gulf of Mexico Sale 147 (March 1994) and Western Gulf of Mexico Sale 150 (August 1994)]. This document includes the purpose and background of the proposed actions, the alternatives, the descriptions of the affected environment, and the potential environmental impacts of the proposed actions and alternatives. Proposed mitigating measures and their effects are analyzed, in addition to potential cumulative impacts resulting from proposed activities.

  14. Environmental Education Program. Final Report.

    ERIC Educational Resources Information Center

    Edwards, Joan; Batty, Sara O.

    This final report deals with the efforts of the Environmental Action Coalition of New York City to change its network of recycling centers from collection points to educational centers for learning about solid waste and related environmental problems. This change was accomplished by first increasing the efficiency and the stability of the centers…

  15. Environmental Education Program. Final Report.

    ERIC Educational Resources Information Center

    Edwards, Joan; Batty, Sara O.

    This final report deals with the efforts of the Environmental Action Coalition of New York City to change its network of recycling centers from collection points to educational centers for learning about solid waste and related environmental problems. This change was accomplished by first increasing the efficiency and the stability of the centers…

  16. Proposed modifications to the Lower Mokelumne River Project, California: FERC Project No. 2916-004. Final environmental impact statement

    SciTech Connect

    Not Available

    1993-11-01

    This final environmental impact statement (FEIS) has been prepared for the Federal Energy Regulatory Commission (Commission) to consider modifications to the existing Lower Mokelumne River Project (LMRP) (FERC Project No. 2916-004) in California. Chinook salmon and steelhead trout populations in the lower Mokelumne River have experienced recent declines and fish kills associated, in part, with discharges from Camanche Dam. The California Department of Fish and Game and the California Sportfishing Protection Alliance have asked the Commission to investigate and correct these problems. A wide range of different mitigation actions has been proposed by parties participating in the scoping of this proceeding, and staff has evaluated these proposed actions in this assessment. The staff is recommending a combination of flow and non-flow modifications to the existing license, including new minimum flow and minimum pool elevation requirements at Camanche Reservoir, ramping rates on dam releases, interim attraction and out-migrant spike flows, instream habitat improvements, and a series of studies and monitoring to determine feasible means for solving off-site fish passage problems.

  17. Record of decision: Final environmental impact statement/report and 4(f) statement. Northeast Corridor Improvement Project electrification, New Haven, CT to Boston, MA. Final report

    SciTech Connect

    1995-05-01

    This record of decision (ROD) completes the environmental review by the Federal Administration (FRA) of the proposal by the National Railroad Passenger Corporation (Amtrak) to extend electric train operation from New Haven, CT, to Boston, MA. In this ROD, FRA approves Amtrak`s proposal subject to the inclusion into the project of a number of measures to eliminate or minimize potential adverse environmental impacts.

  18. 76 FR 28064 - Notice of Availability of the Final Environmental Impact Statement for Palen Solar I, LLC's Palen...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-13

    ..., Palm Springs, California 92262. Copies are also available for public inspection at this address... accordance with the National Environmental Policy Act of 1969, as amended (NEPA), and the Federal Land Policy... Final EIS in the Federal Register initiates a 30-day public comment period. In addition, the...

  19. 77 FR 15795 - Notice of Availability of a Final Environmental Impact Statement for the Gasco Energy Inc. Uinta...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-16

    ... Federal oil and gas leases. The Final EIS analysis allows the BLM to choose a course of action that.... would develop their existing oil and gas leases by drilling 1,491 wells from the same number of well... Vernal BLM Web site, and Utah BLM's Environmental Notification Bulletin Board. Juan Palma, State...

  20. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix F: Irrigation, Municipal and Industrial/Water Supply.

    SciTech Connect

    Columbia River System Operations Review; United States. Bonneville Power Administration; United States. Army. Corps of Engineers. North Pacific Division; United States. Bureau of Reclamation. Pacific Northwest Region.

    1995-11-01

    Since the 1930`s, the Columbia River has been harnessed for the benefit of the Northwest and the nation. Federal agencies have built 30 major dams on the river and its tributaries. Dozens of non-Federal projects have been developed as well. The dams provide flood control, irrigation, navigation, hydro-electric power generation, recreation, fish and wildlife, and streamflows for wildlife, anadromous fish, resident fish, and water quality. This is Appendix F of the Environmental Impact Statement for the Columbia River System, focusing on irrigation issues and concerns arrising from the Irrigation and Mitigation of impacts (M&I) working Group of the SOR process. Major subheadings include the following: Scope and process of irrigation/M&I studies; Irrigation/M&I in the Columbia Basin Today including overview, irrigated acreage and water rights, Irrigation and M&I issues basin-wide and at specific locations; and the analysis of impacts and alternative for the Environmental Impact Statement.

  1. Final Environmental Impact Statement. Disposal and Reuse of George Air Force Base, California. Volume 2. Public Comments and Responses, Appendices

    DTIC Science & Technology

    1992-03-01

    Included: airspace analysls/recommendations, environmental/socloeconomic Impact, comparative analysis of reuse alternatives, Impact of future technology ...TRANSPORTATION 7.1 •ment: VVEDA’s proposal, based on the P & D Technologies Projected Flight Operations, shows a total of 23,100 passenger operations...Increased moble source activity associated with economic and population growth, Including Increased vehicle actvty associated with reuse actions

  2. 75 FR 39668 - Notice of Availability of Final Environmental Impact Statement for the Proposed Rio del Oro...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-12

    ...' ongoing planning efforts. The FEIS has been prepared as joint documents with the City of Rancho Cordova (City). The City is the local agency responsible for preparing an Environmental Impact Report in... decision regarding issuance of an individual permit under section 404 of the Clean Water Act. It also...

  3. 76 FR 53422 - Notice of Availability of the Record of Decision on the Final Programmatic Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-26

    ... Implementation Process (AMIP) (preferred alternative) with a construction ceiling of acres associated with... environmental impacts as well as costs. ADDRESSES: Questions or comments on the ROD should be sent to... Adaptive Management Implementation Process (AMIP), with a construction ceiling of Alternative...

  4. 78 FR 37528 - Intent To Prepare a Draft Supplement to the December 2009 Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-21

    ... Environmental Impact Statement (FEIS) for the Relocation of New River Inlet Ebb Tide Channel and the Placement... modify their original May 27, 2011 DA authorization to relocate the New River Inlet ebb tide channel and... within the relocated ebb tide channel, which is equivalent to a maximum of one maintenance event every...

  5. 78 FR 65606 - Availability of the Final Environmental Assessment (EA) and a Finding of No Significant Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-01

    ...., Research and Education Center Headquarters, 1420 Experiment Station Road, Watkinsville, Georgia 30677. Oconee County Public Library, 1080 Experiment Station Road, Watkinsville, Georgia 30677. ] Athens-Clarke... Proposed Action. The Final EA addresses potential impacts of these alternatives on the natural and...

  6. Final Environmental Impact Statement/Environmental Impact Report for the California Acoustic Thermometry of Ocean Climate Project and its associated Marine Mammal Research Program. Volume 1

    DTIC Science & Technology

    1995-04-01

    facilities or operations would be subject to additional environmental review and authorization. The lessons learned from the demonstration phase will...equipment design, sound levels, mitigation measures, etc. Since it is not presently known what would be learned from the demonstration phase , the...models are to serve as a persuasive basis for policy formulation. The proposed ATOC project is a demonstration or "proof of concept" phase , with the

  7. Environmental Impact Analysis Process. Final Environmental Impact Statement. Part 2A. Proposed Central Radar System Over-the-Horizon Backscatter Radar Program

    DTIC Science & Technology

    1987-05-01

    CODE o t ovSfa , S 4 e , t III_ .,, ., , ¢ . 13. ABSTRACT (Maximum 200 words) 9Iels S ji - .e -’ L.. . -. •- * AUt GO51993- 14. SUBJECT TERMS 15 . NUMBER...EIS was filed with the U.S. Environmental Protection Agency on August 15 , 1986. Public hearings on the Draft EIS were held in Grand Forks, North Dakota...on August 15 , 1986. Part II includes the transcripts of the public hearings, comments and questions submitted to the Air Force, and the Air Force’s

  8. Western Regional Final Supplemental Environmental Impact Statement: Rulemaking for Small Power Production and Cogeneration Facilities - Exemptions for Geothermal Facilities

    SciTech Connect

    Heinemann, Jack M.; Nalder, Nan; Berger, Glen

    1981-02-01

    Section 643 of the Energy Security Act of 1980 directed the Federal Energy Regulatory Commission to develop rules to further encourage geothermal development by Small Power Production Facilities. This rule amends rules previously established in Dockets No. RM79-54 and 55 under Section 201 and 210 of the Public Utility Regulatory Policies Act of 1978 (PURPA). The analysis shows that the rules are expected to stimulate the development of up to 1,200 MW of capacity for electrical generation from geothermal facilities by 1995--1,110 MW more than predicted in the original PURPA EIS. This Final Supplemental EIS to the DEIS, issued by FERC in June 1980, forecasts likely near term development and analyzes environmental effects anticipated to occur due to development of geothermal resources in the Western United States as a result of this additional rulemaking.

  9. Final Programmatic Environmental Impact Statement for Defense Threat Reduction Agency (DTRA) Activities on White Sands Missile Range, New Mexico

    DTIC Science & Technology

    2007-05-01

    Kirkland AFB, New Mexico 87117-5776 Dear Sir or madam : Please find enclosed the Record of Decision (ROD) for the Final Programmatic Environmental...0 9 -:g .~2 ISF ’R E vi0 OM Ŕ I; ba C6z I ts’a bO Ej 0~~I00 ) ~ ~ 2 E§ 4"D 0 . :! n0 0 -a -ý 00 -4 -c 0.0 0 -Z u o 0~. 00-~ U~~ . -Q. ý ’- Eam 0 r...0 bO 0’ 0 CIO 0 0 u. al S5 0 - t0. E ~ ~ U >0 - L .- m. 00. ’-o o- 00 co 0. 0. .. . m u. 0 -,I bo a - ’I it 00 u .00 0 n 0I ’t cl I ~ -~~ ~ Z u~O

  10. Final environmental impact statement. Management of commercially generated radioactive waste. Volume 3. Public comments hearing board report

    SciTech Connect

    Not Available

    1980-10-01

    This EIS analyzes the significant environmental impacts that could occur if various technologies for management and disposal of high-level and transuranic wastes from commercial nuclear power reactors were to be developed and implemented. This EIS will serve as the environmental input for the decision on which technology, or technologies, will be emphasized in further research and development activities in the commercial waste management program. The action proposed in this EIS is to (1) adopt a national strategy to develop mined geologic repositories for disposal of commercially generated high-level and transuranic radioactive waste (while continuing to examine subseabed and very deep hole disposal as potential backup technologies) and (2) conduct a R and D program to develop such facilities and the necessary technology to ensure the safe long-term containment and isolation of these wastes. The Department has considered in this statement: development of conventionally mined deep geologic repositories for disposal of spent fuel from nuclear power reactors and/or radioactive fuel reprocessing wastes; balanced development of several alternative disposal methods; and no waste disposal action. This volume contains written public comments and hearing board responses and reports offered on the draft statement.

  11. Final Environmental Impact Statement for the construction and operation of Claiborne Enrichment Center, Homer, Louisiana (Docket No. 70-3-70). Volume 2, Public comments and NRC response

    SciTech Connect

    Zeitoun, A.

    1994-08-01

    The Final Environmental Impact Statement (FEIS) (Volume 1), was prepared by the Nuclear Regulatory Commission (NRC) in accordance with regulation 10 CFR Part 51, which implements the National Environmental Policy Act (NEPA), to assess the potential environmental impacts for licensing the construction and operation of a proposed gaseous centrifuge enrichment facility to be built in Claiborne Parish, Louisiana by Louisiana Energy Services, L.P. (LES). The proposed facility would have a production capacity of about 866 metric tons annually of up to 5 weight percent enriched UF{sub 6}, using a proven centrifuge technology. Included in the assessment are co on, both normal operations and potential accidents (internal and external events), and the eventual decontamination and decommissioning of the site. In order to help assure that releases from the operation of the facility and potential impacts on the public are as low as reasonably achievable, an environmental monitoring program was developed by LES to detect significant changes in the background levels of uranium around the site. Other issues addressed include the purpose and need for the facility, the alternatives to the proposed action, potential disposition of the tails, the site selection process, and environmental justice. The NRC staff concludes that the facility can be constructed and operated with small and acceptable impacts on the public and the environment, and proposes to issue a license to the applicant, Louisiana Energy Services, to authorize construction and operation of the proposed facility. The letters in this Appendix have been divided into three sections. Section One contains letters to which the NRC responded by addressing specific comments. Section Two contains the letters that concerned the communities of Forest Grove and Center Springs. Section Three is composed of letters that required no response. These letters were generally in support of the facility.

  12. The Environmental Impact Handbook.

    ERIC Educational Resources Information Center

    Burchell, Robert W.; Listokin, David

    The National Environmental Policy Act of 1969 requires an environmental impact statement for any major federal action affecting the human environment. Now many state and local governments require impact statements from state agencies or private agencies. This handbook presents a standardized approach to the development and implementation of…

  13. Environmental Impact Statements.

    ERIC Educational Resources Information Center

    Pietz, Reuel Henry

    The paper explores the role of geographers in preparing environmental impact statements (EISs). In 1969 the National Environmental Policy Act mandated that an EIS be prepared for every legislative proposal that significantly affects the environmental quality. EISs must be prepared by interdisciplinary teams representing natural and social sciences…

  14. Remedial actions at the former Vitro Rare Metals plant site, Canonsburg, Washington County, Pennsylvania. Final Environmental Impact Statement. Volume II. Appendices

    SciTech Connect

    Not Available

    1983-07-01

    This report provides a summary of the conceptual design and other information necessary to understand the proposed remedial action at the expanded Canonsburg, Pennsylvania site. This design constitutes the current approach to stabilizing the radioactively contaminated materials in place in a manner that would fully protect the public health and environment. This summary is intended to provide sufficient detail for the reader to understand the proposed remedial action and the anticipated environmental impacts. The site conceptual design has been developed using available data. In some cases, elements of the design have not been developed fully and will be made final during the detailed design process.

  15. Final programmatic environmental impact statement for the uranium mill tailings remedial action ground water project. Volume II

    SciTech Connect

    1996-10-01

    Volume II of the programmatic environmental impact statement (PElS) is a comment and response document; it is the collection of the comments received on the draft PElS. The U.S. Department of Energy's (DOE) response to each comment is provided after each comment. If the comment resulted in a change to the PElS, the affected section number of the PElS is provided in the response. Comments 1 through 259 were received at public hearings. The name of the hearing at which the comment was received is listed after each comment. Comments were recorded on flip charts and by notetakers. DOE representatives were present to hear the comments and respond to them. The DOE's written response is provided after each comment. Comments 260 through 576 were received in writing at the hearings, and from various federal, tribal, and state agencies and from individuals during the public comment period. Copies of the written comments follow the comments and responses.

  16. Petroleum production at Maximum Efficient Rate Naval Petroleum Reserve No. 1 (Elk Hills), Kern County, California. Final Supplemental Environmental Impact Statement

    SciTech Connect

    Not Available

    1993-07-01

    This document provides an analysis of the potential impacts associated with the proposed action, which is continued operation of Naval Petroleum Reserve No. I (NPR-1) at the Maximum Efficient Rate (MER) as authorized by Public law 94-258, the Naval Petroleum Reserves Production Act of 1976 (Act). The document also provides a similar analysis of alternatives to the proposed action, which also involve continued operations, but under lower development scenarios and lower rates of production. NPR-1 is a large oil and gas field jointly owned and operated by the federal government and Chevron U.SA Inc. (CUSA) pursuant to a Unit Plan Contract that became effective in 1944; the government`s interest is approximately 78% and CUSA`s interest is approximately 22%. The government`s interest is under the jurisdiction of the United States Department of Energy (DOE). The facility is approximately 17,409 acres (74 square miles), and it is located in Kern County, California, about 25 miles southwest of Bakersfield and 100 miles north of Los Angeles in the south central portion of the state. The environmental analysis presented herein is a supplement to the NPR-1 Final Environmental Impact Statement of that was issued by DOE in 1979 (1979 EIS). As such, this document is a Supplemental Environmental Impact Statement (SEIS).

  17. Remedial actions at the former Vitro Rare Metals plant site, Canonsburg, Washington County, Pennsylvania. Final Environmental Impact Statement. Volume I

    SciTech Connect

    Not Available

    1983-07-01

    The environmental impacts associated with remedial actions in connection with residual radioactive materials remaining at the inactive uranium processing site located in Canonsburg, Washington County, Pennsylvania are evaluated. The Canonsburg site is an 18.5-acre property that was formerly owned by the Vitro Rare Metals Company. The expanded Canonsburg site would be 30-acre property that would include the Canonsburg site (the former Vitro Rare Metals plant), seven adjacent private houses, and the former Georges Pottery property. During the period 1942 through 1957 the Vitro Manufacturing Company and its successor, the Vitro Corporation of America, processed onsite residues and ores, and government-owned ores, concentrates, and scraps to extract uranium and other rare metals. The Canonsburg site is now the Canon Industrial Park. In addition to storing the residual radioactive materials of this process at the Canonsburg site, about 12,000 tons of radioactively contaminated materials were transferred to a railroad landfill in Burrell Township, Indiana County, Pennsylvania. This Canonsburg FEIS evaluates five alternatives for removing the potential public health hazard associated with the radioactively contaminated materials. In addition to no action, these alternatives involve various combinations of stabilization of the radioactively contaminated materials in place or decontamination of the Canonsburg and Burrell sites by removing the radioactively contaminated materials to another location. In addition to the two sites mentioned, a third site located in Hanover Township, Washington County, Pennsylvania has been considered as a disposal site to which the radioactively contaminated materials presently located at either of the other two sites might be moved.

  18. Final environmental impact statement for the Nevada Test Site and off-site locations in the state of Nevada: Mitigation action plan

    SciTech Connect

    1997-02-01

    The DOE Notice of Availability for this environmental impact statement was published in the Federal Register on Friday, October 18, 1996 (61 FR 54437). The final environmental impact statement identifies potential adverse effects resulting from the four use alternatives evaluated and discusses measures that DOE considered for the mitigation of these potential adverse effects. The Secretary of Energy signed the Record of Decision on the management and operation of the Nevada Test Site and other DOE sites in the state of Nevada on December 9, 1996. These decisions will result in the continuation of the multipurpose, multi-program use of the Nevada Test Site, under which DOE will pursue a further diversification of interagency, private industry, and public-education uses while meeting its Defense Program, Waste Management, and Environmental Restoration mission requirements at the Nevada Test Site and other Nevada sites, including the Tonopah Test Range, the Project Shoal Site, the Central Nevada Test Area, and on the Nellis Air Force Range Complex. The Record of Decision also identifies specific mitigation actions beyond the routine day-to-day physical and administrative controls needed for implementation of the decisions. These specific mitigation actions are focused on the transportation of waste and on groundwater availability. This Mitigation Action Plan elaborates on these mitigation commitments.

  19. Final environmental impact report. Part I. Pacific Gas and Electric Company Geysers Unit 16, Geothermal Power Plant, Lake County, California

    SciTech Connect

    Not Available

    1981-03-01

    The environmental analysis includes the following: geology, soils, hydrology, water quality, vegetation, wildlife, air resources, health and safety, noise, waste management, cultural resources, land use, aesthetics, socioeconomics, public services, transportation, and energy and material resources. Also included are: the project description, a summary of environmental consequences, and alternatives to the proposed action. (MHR)

  20. 76 FR 42121 - Final Notice of a Finding of No Significant Impact for a Programmatic Environmental Assessment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-18

    ... Environmental Policy Act (NEPA), 42 United States Code 4321, and the Marine Corps NEPA directive (Marine Corps... Assessment Implementing a Wind Energy Program at Marine Forces Reserve Facilities Located Across the United... (MARFORRES) Facilities Located Across the United States. SUMMARY: Pursuant to the Council on Environmental...

  1. Environmental Impact Statements Defended

    ERIC Educational Resources Information Center

    Chemical and Engineering News, 1976

    1976-01-01

    Discusses a government report that claims that government decision making has improved since federal agencies have been required to submit any proposed action in the form of an environmental impact statement for comments by the public and other agencies. (MLH)

  2. DOE/EIS-0355 Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah, Final Environmental Impact Statement (July 2005)

    SciTech Connect

    N /A

    2005-08-05

    The U.S. Department of Energy (DOE or the Department) is proposing to clean up surface contamination and implement a ground water compliance strategy to address contamination that resulted from historical uranium-ore processing at the Moab Uranium Mill Tailings Site (Moab site), Grand County, Utah. Pursuant to the National Environmental Policy Act (NEPA), 42 United States Code (U.S.C.) {section} 4321 et seq., DOE prepared this environmental impact statement (EIS) to assess the potential environmental impacts of remediating the Moab site and vicinity properties (properties where uranium mill tailings were used as construction or fill material before the potential hazards associated with the tailings were known). DOE analyzed the potential environmental impacts of both on-site and off-site remediation and disposal alternatives involving both surface and ground water contamination. DOE also analyzed the No Action alternative as required by NEPA implementing regulations promulgated by the Council on Environmental Quality. DOE has determined that its preferred alternatives are the off-site disposal of the Moab uranium mill tailings pile, combined with active ground water remediation at the Moab site. The preferred off-site disposal location is the Crescent Junction site, and the preferred method of transportation is rail. The basis for this determination is discussed later in this Summary. DOE has entered into agreements with 12 federal, tribal, state, and local agencies to be cooperating agencies in the development and preparation of this EIS. Several of the cooperating agencies have jurisdiction by law and intend to use the EIS to support their own decisionmaking. The others have expertise relevant to potential environmental, social, or economic impacts within their geographic regions. During the preparation of the EIS, DOE met with the cooperating agencies, provided them with opportunities to review preliminary versions of the document, and addressed their comments

  3. 75 FR 55313 - Final Environmental Impact Statement (FEIS) for Grow the Army Actions at Fort Lewis and the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-10

    ... Lewis-McChord, WA 98433-9500. FOR FURTHER INFORMATION CONTACT: Mr. Bill Van Hoesen, Joint Base Lewis- McChord National Environmental Policy Act (NEPA) Coordinator, at (253) 966-1780 during normal...

  4. 77 FR 24980 - Final General Management Plan and Environmental Impact Statement for the South Unit of Badlands...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-26

    ... and an environmental analysis. The GMP provides a framework for making decisions about and managing... substantive changes were made to the preferred alternative as a result of public comments received on the...

  5. 77 FR 40345 - Notice of the Availability of Record of Decision for the Final Supplemental Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-09

    ... Office (PMO) Web site ( http://www.bracpmo.navy.mil/ ). The ROD and Final SEIS are also available for... will be made available upon request by contacting: Director, BRAC PMO West, Attention: Mr. Ronald...

  6. 75 FR 44978 - Notice of Availability of the Wright Area Coal Final Environmental Impact Statement That Includes...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-30

    ... adjacent to the North Antelope Rochelle Mine. On October 12, 2007, BTU Western Resources, Inc. filed a... the Final EIS. The Black Thunder Mine, Jacobs Ranch Mine, and North Antelope Rochelle Mine...

  7. Environmental impact report (draft)

    SciTech Connect

    Not Available

    1980-05-01

    The three projects as proposed by Pacific Gas and Electric Company and the environmental analysis of the projects are discussed. Sections on the natural and social environments of the proposed projects and their surrounding areas consist of descriptions of the setting, discussions of the adverse and beneficial consequences of the project, and potential mitigation measures to reduce the effects of adverse impacts. The Environmental Impact Report includes discussions of unavoidable adverse effects, irreversible changes, long-term and cumulative impacts, growth-inducing effects, and feasible alternatives to the project. (MHR)

  8. Final Environmental Impact Statement Second Main Operating Base KC-46A Beddown at Alternative Air National Guard Installations

    DTIC Science & Technology

    2014-06-01

    Alternatives 2- 13 Final – June 2014 Implementation of the KC-46A aircraft beddown would require the 190 ARW to ensure its installation has properly sized...Proposed Action and Alternatives 2- 13 Final – June 2014 Implementation of the KC-46A aircraft beddown would require the 190 ARW to ensure its...4-142, 5-5, 5- 13 , 5-20, 5-27, GLOSS-6 State Implementation Plan (SIP), ES-11, ES- 20, 2-6, 2-59, 2-68, 2-69, 4-156, 5-10 Stormwater, 3-14, 3-21, 3

  9. 77 FR 53231 - Final Environmental Impact Statement for the Odessa Subarea Special Study-Columbia Basin Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-31

    ... State Department of Ecology (Ecology), the joint lead agency, is notifying the public that they have... January 31, 2011. Reclamation and Ecology have clarified the FEIS is the initial environmental analysis within a tiered process under NEPA and SEPA. Reclamation and Ecology expect that some projects or actions...

  10. 77 FR 9960 - Final Environmental Impact Statement for Extension of F-Line Streetcar Service to Fort Mason...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-21

    ... Fort Mason Center, San Francisco, CA AGENCY: National Park Service, Department of the Interior. ACTION... Service to Fort Mason Center, San Francisco, California. SUMMARY: Pursuant to National Environmental... Wharf to the Fort Mason Center, in San Francisco, California. DATES: The National Park Service (NPS...

  11. 75 FR 44278 - Notice of Availability of the Final Environmental Impact Statement for the Imperial Valley Solar...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-28

    ... into a MOU with the California Energy Commission (CEC) to conduct a joint environmental review of solar... Energy Systems Solar Two Project and Possible California Desert Conservation Area Plan Amendment was... Imperial Valley Solar, LLC Project, California and the Proposed California Desert Conservation Area Plan...

  12. 76 FR 30679 - Notice of Availability of Final Environmental Impact Statement for the Proposed Folsom South of U...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-26

    ... with the City of Folsom (City). The City is the local agency responsible for preparing an Environmental... for a decision regarding issuance of an individual permit under Section 404 of the Clean Water Act. It... applicants, are seeking adoption by the City of the proposed SPA project and associated entitlements. The...

  13. 76 FR 62440 - Final Environmental Impact Statement for the Manzanita Band of Kumeyaay Indians Fee-to-Trust...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-07

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF THE INTERIOR... Fee-to-Trust Transfer and Casino Project, Calexico, CA AGENCY: Bureau of Indian Affairs, Department of... Environmental Protection Agency (EPA) for the Tribe's proposed 60.8- acre fee-to-trust transfer and casino...

  14. Final Environmental Assessment and Finding of No Significant Impact: Ground Water Compliance at the Slick Rock, Colorado, UMTRA Project Site

    SciTech Connect

    N /A

    2003-03-13

    This environmental assessment addresses the environmental effects of a proposed action and the no action alternative to comply with U.S. Environmental Protection Agency (EPA) ground water standards at the Slick Rock, Colorado, Uranium Mill Tailings Remedial Action Project sites. The sites consist of two areas designated as the North Continent (NC) site and the Union Carbide (UC) site. In 1996, the U.S. Department of Energy (DOE) completed surface cleanup at both sites and encapsulated the tailings in a disposal cell 5 miles east of the original sites. Maximum concentration limits (MCLs) referred to in this environmental assessment are the standards established in Title 40 ''Code of Federal Regulations'' Part 192 (40 CFR 192) unless noted otherwise. Ground water contaminants of potential concern at the NC site are uranium and selenium. Uranium is more prevalent, and concentrations in the majority of alluvial wells at the NC site exceed the MCL of 0.044 milligram per liter (mg/L). Selenium contamination is less prevalent; samples from only one well had concentrations exceeding the MCL of 0.01 mg/L. To achieve compliance with Subpart B of 40 CFR 192 at the NC site, DOE is proposing the strategy of natural flushing in conjunction with institutional controls and continued monitoring. Ground water flow and transport modeling has predicted that concentrations of uranium and selenium in the alluvial aquifer will decrease to levels below their respective MCLs within 50 years.

  15. 75 FR 65372 - Final Environmental Impact Statement for the Proposed Fee-to-Trust Conveyance of Property for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-22

    ... of Property for the Cayuga Nation of New York in Cayuga and Seneca Counties, NY AGENCY: Bureau of... Indian gaming, operational at the time of the application, on one property in Seneca County and one... Nation, Seneca County, Cayuga County and New York State Department of Environmental Conservation....

  16. 78 FR 64003 - Notice of Availability of the Final Environmental Impact Statement for the Jump Creek, Succor...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-25

    ... detailed analysis of actions and alternative actions identified in the applications for grazing permit... function are analyzed in the Final EIS. Also included is an analysis of the potential effects of livestock... resulted in the addition of clarifying text but did not significantly change proposed decisions....

  17. 75 FR 47620 - Notice of Availability of the Final Environmental Impact Statement and Proposed Amendment to the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-06

    ... operate a concentrated solar thermal power plant facility on public lands in San Bernardino County... ROW grant to construct, operate, and decommission a solar thermal power facility on public lands in... solar thermal power. The Final EIS also analyzes three alternatives under which the project would not be...

  18. 75 FR 19991 - Notice of Availability of the Final Environmental Impact Statement for the UNEV Refined Liquid...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-16

    ... Refined Liquid Petroleum Products Pipeline in Utah and Nevada and the Proposed Amendment of the Pony... Petroleum Products Pipeline and Pony Express Proposed RMPA/Final EIS have been sent to affected Federal... Pony Express Resource Management Plan so that it would be consistent with the grant of a...

  19. 75 FR 17756 - Availability of the Final General Management Plan and Environmental Impact Statement (GMP/EIS...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-07

    ..., natural, and socioeconomic environments. The Final GMP/EIS contains NPS responses to public comments on... relatively insulated from the surrounding urban conditions. Motorized boating would not be appropriate in... the NPS Planning, Environment, and Public Comment Web site ( http://parkplanning.nps.gov )...

  20. Final Environmental Impact Statement (As Amended 18 January 1972) Minnesota River, Minnesota, Mankato-North Mankato-Le Hillier. Flood Control. Phase I. Final Supplement II-A.

    DTIC Science & Technology

    1982-10-01

    8217AD-A140 425 FNAL ENVIRONMENTAL IMPAC STATEMENT (As AMENDED N JANUARY 1972 MA NNESO..U CORPS OF EN GNEERS ST PAIL INCLASSIFES PANS 13/2 NL 0 E...34hot spots" to insure that ambient air quality standards are not exceeded. See Technical Report No. 6, "Natural Resources." 4.13 Water Resources...cold starts at an ambient temperature of 200 F. The estimated 1985 (year of completion) and 1995 peak one-hour and eight-hour concentrations

  1. 77 FR 26039 - Notice of Availability of the Final Environmental Impact Statement for the Phoenix Copper Leach...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-02

    ... Impact Statement for the Phoenix Copper Leach Project, Lander County, NV AGENCY: Bureau of Land... Phoenix Copper Leach Project and by this notice is announcing its availability. DATES: The BLM will not... Phoenix Copper Leach Project are available for public inspection at the BLM, 50 Bastian Road,...

  2. 78 FR 34639 - Supplemental Final Environmental Impact Statement for the Restart of Healy Power Plant Unit #2

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-10

    ... operation for two years as part of DOE's project. Unit 2 has been in warm layup since late 1999. The SFEIS updates information in DOE's FEIS and considers impacts of restarting Unit 2 for commercial operation. The... Plant Unit 2 AGENCY: Rural Utilities Service, USDA. ACTION: Notice of Availability of a Supplemental...

  3. 78 FR 146 - Notice of Availability of Final Environmental Assessment and Finding of No Significant Impact for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-02

    ... Assessment (FEA) and Finding of No Significant Impact (FONSI) for the Longhorn Pipeline Reversal Project (Project). PHMSA has posted the FEA and FONSI online at http://www.regulations.gov in docket number PHMSA... Longhorn Pipeline than it would have under normal circumstances. Accordingly, PHMSA has issued an FEA in...

  4. 76 FR 59121 - Notice of Availability of the Record of Decision for the Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-23

    ... drainage crossings; building pads; and water quality control facilities (sedimentation control, flood control, debris, and water quality basins). The LEDPA also includes temporary impacts to 35.3 acres of... protection; water quality control facilities (sedimentation control, flood debris, and water quality...

  5. 75 FR 5757 - Notice of Availability of Final Environmental Assessment and Finding of No Significant Impact for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-04

    ... Finding of No Significant Impact for the Delta-Clearwater Remediation Project, Delta Junction, AK AGENCY... (NEPA) of 1969, as amended, to construct the Delta-Clearwater Remediation Project, authorized under the....5 Alaska Highway, Jarvis Office Building, Delta Junction, AK 99737. FOR FURTHER INFORMATION...

  6. 78 FR 27416 - Notice of Availability of the Final Record of Decision for the Programmatic Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-10

    ... imaging and X-ray Inspection Technologies On page 2-11 and in the table on page 2-12 of the Final PEIS... inspection systems and X-ray technologies. The bullet at the bottom of page 2-11 explains why CBP evaluates... X-ray scanners by CBP, the bullet at the bottom of page 2-11 was amended so it now reads as follows...

  7. Environmental Prosperity Game. Final report

    SciTech Connect

    Berman, M.; Boyack, K.; VanDevender, J.P.

    1995-12-01

    Prosperity Games are an outgrowth and adaptation of move/countermove and seminar War Games. Prosperity Games are simulations that explore complex issues in a variety of areas including economics, politics, sociology, environment, education and research. These issues can be examined from a variety of perspectives ranging from a global, macroeconomic and geopolitical viewpoint down to the details of customer/supplier/market interactions in specific industries. All Prosperity Games are unique in that both the game format and the player contributions vary from game to game. This report documents the Environmental Prosperity Game conducted under the sponsorship of the Silicon Valley Environmental Partnership. Players were drawn from all stakeholders involved in environmental technologies including small and large companies, government, national laboratories, universities, environmentalists, the legal profession, finance, and the media. The primary objectives of this game were to: investigate strategies for developing a multi-agency (national/state/regional), one-step regulatory approval process for certifying and implementing environmental technologies and evaluating the simulated results; identify the regulatory hurdles and requirements, and the best approaches for surmounting them; identify technical problems and potential resources (environmental consultants, labs, universities) for solving them. The deliberations and recommendations of these players provided valuable insights as to the views of this diverse group of decision makers concerning environmental issues, including the development, licensing, and commercialization of new technologies.

  8. Community Environmental Study Program. Final Report.

    ERIC Educational Resources Information Center

    Minnesota Environmental Sciences Foundation, Inc., Minneapolis.

    This booklet contains the final report of an environmental education project designed to make use of the local community as an environmental learning resource. This three year program was developed by the Minnesota Environmental Science Foundation, Inc. in conjunction with three local school systems. The booklet is divided into five major…

  9. Environmental impact of wind energy

    NASA Astrophysics Data System (ADS)

    Mann, J.; Teilmann, J.

    2013-09-01

    One purpose of wind turbines is to provide pollution-free electric power at a reasonable price in an environmentally sound way. In this focus issue the latest research on the environmental impact of wind farms is presented. Offshore wind farms affect the marine fauna in both positive and negative ways. For example, some farms are safe havens for porpoises while other farms show fewer harbor porpoises even after ten years. Atmospheric computer experiments are carried out to investigate the possible impact and resource of future massive installations of wind turbines. The following questions are treated. What is the global capacity for energy production by the wind? Will the added turbulence and reduced wind speeds generated by massive wind farms cool or heat the surface? Can wind farms affect precipitation? It is also shown through life-cycle analysis how wind energy can reduce the atmospheric emission of eight air pollutants. Finally, noise generation and its impact on humans are studied.

  10. Final Environmental Impact Statement, Peacekeeper in Minuteman Silos, F. E. Warren AFB, Wyoming. Volume 2. Public Comments.

    DTIC Science & Technology

    1984-01-01

    h 0 ;0o ,c- tice -n ens., ’ttn Ii taus Po’.m1 disph lon e ofn O inthoPovsinefmubicseviesi, Itne~~r iies Cyl. -eoonKn waen 1~t ins, o*e tah ’noec...ttinuteaen iasuleis ha tracsported to Hill Aft Ir. ithe Federal Oegiataer maegy a aufcet o iengr S tah "Ml ..o .strae f latol th: IMPact of this actitn...most IT hav. to be forgives. I cos. it’s a"b your probleo. It’s U and tM grooss baa sot bso falt. sOat Problem a" OWtOSO. If to -N l60ot built i.o a48

  11. Final Environmental Planning Technical Report

    DTIC Science & Technology

    1984-01-01

    Project Average Manpower Requirements By Year 1-8 1.1-2 Total Jobs, Local and Regional Hires, and Inmigration 1-8 for the Employment Demand Region of...No Action Alternative, mitigation measures, and unavoidable impacts. It c)ntains detailed definitions of each potential leve of impact (negligible, low ...jobs including those which are considered to be filled by available labor; as well as those filled by weekly commuters and inmigrants , on an annual

  12. Environmental Impact Assessment

    ERIC Educational Resources Information Center

    Castrilli, Joseph; Block, Elizabeth

    1975-01-01

    Increasing concern with pollution and the energy crisis surfaced the need for environmental impact assessment. Certain requirements for such statements have been identified by different Canadian groups. Among them are the need for total citizen involvement and the utilization of these statements, once completed. (MA)

  13. 75 FR 42819 - Notice of Availability of a Final Environmental Assessment (Final EA) and a Finding of No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-22

    ... Federal Aviation Administration Notice of Availability of a Final Environmental Assessment (Final EA) and a Finding of No Significant Impact (FONSI)/Record of Decision (ROD) for the Proposed ORD Airport...: Notice of Availability of a Final Environmental Assessment (Final EA) and Finding of No...

  14. Final Environmental Impact Statement ’Dredge River Channel: Naval Submarine base, New London, Groton, Connecticut’ Dated December, 1973. Volume 1. Draft Supplement.

    DTIC Science & Technology

    WASTE DISPOSAL, *DREDGING, *SPOIL, *ENVIRONMENTAL IMPACT STATEMENTS, SITES, MARINE BIOLOGY, RIVERS, NAVAL PLANNING, CONNECTICUT, WATER QUALITY, NAVAL SHORE FACILITIES, OCEAN ENVIRONMENTS, SEDIMENTS, HARBORS, CHANNELS(WATERWAYS), TURBIDITY, ESTUARIES, NUCLEAR POWERED SUBMARINES, LONG ISLAND SOUND .

  15. Radiological health review of the Final Environmental Impact Statement Waste Isolation Pilot Plant. Volumes 1 and 2. DOE/EIS-0026

    SciTech Connect

    Not Available

    1981-01-01

    Purpose of the Environmental Evaluation Group (EEG) is to conduct an independent technical evaluation of the potential radiation exposure to people from the proposed Federal radioactive Waste Isolation Pilot Plant (WIPP) near Carlsbad, in order to protect the public health and safety and ensure that there is minimal environmental degradation. Analyses are conducted of reports issued by the US DOE and its contractors, other Federal agencies and other organizations, as they relate to the potential health, safety and environmental impacts from WIPP.

  16. Preliminary Final Environmental Impact Statement

    DTIC Science & Technology

    2000-12-01

    Department. Heavy industrial land uses (e.g., power plants, dry cleaning plants, heavy metal plating, foundries, storage yards) that would require use...Warehousing; open storage; vehicle shops; fuel storage; maintenance shops; solid/liquid waste facilities 130 Medical Clinic; dental clinic; medical...pre-engineered buildings with exterior metal finish. The Administrative and Recreational District includes buildings that provide base support

  17. Environmental Impact Assessment: A Procedure.

    ERIC Educational Resources Information Center

    Stover, Lloyd V.

    Prepared by a firm of consulting engineers, this booklet outlines the procedural "whys and hows" of assessing environmental impact, particularly for the construction industry. Section I explores the need for environmental assessment and evaluation to determine environmental impact. It utilizes a review of the National Environmental Policy Act and…

  18. Environmental Impact Assessment: A Procedure.

    ERIC Educational Resources Information Center

    Stover, Lloyd V.

    Prepared by a firm of consulting engineers, this booklet outlines the procedural "whys and hows" of assessing environmental impact, particularly for the construction industry. Section I explores the need for environmental assessment and evaluation to determine environmental impact. It utilizes a review of the National Environmental Policy Act and…

  19. Klickitat Cogeneration Project : Final Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration; Klickitat Energy Partners

    1994-09-01

    To meet BPA`s contractual obligation to supply electrical power to its customers, BPA proposes to acquire power generated by Klickitat Cogeneration Project. BPA has prepared an environmental assessment evaluating the proposed project. Based on the EA analysis, BPA`s proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 for the following reasons: (1)it will not have a significant impact land use, upland vegetation, wetlands, water quality, geology, soils, public health and safety, visual quality, historical and cultural resources, recreation and socioeconomics, and (2) impacts to fisheries, wildlife resources, air quality, and noise will be temporary, minor, or sufficiently offset by mitigation. Therefore, the preparation of an environmental impact statement is not required and BPA is issuing this FONSI (Finding of No Significant Impact).

  20. 7 CFR 1955.136 - Environmental Assessment (EA) and Environmental Impact Statement (EIS).

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 14 2010-01-01 2009-01-01 true Environmental Assessment (EA) and Environmental Impact... Disposal of Inventory Property General § 1955.136 Environmental Assessment (EA) and Environmental Impact Statement (EIS). (a) Prior to a final decision on some disposal actions, an environmental assessment must be...

  1. Remedial actions at the former Climax Uranium Company, Uranium Mill site, Grand Junction, Mesa County, Colorado. Volume 1, Text: Final environmental impact statement

    SciTech Connect

    1986-12-01

    This statement evaluates and compares the environmental impacts associated with the remedial actions of the residual radioactive materials remaining at the inactive uranium processing site and associated vicinity properties at Grand Junction, Mesa County, Colorado. This statement is also intended to aid the BLM in amending their management framework plans and final resource management plan, as well as assisting in compliance with the withdrawal application as appropriate. The site is a 114-acre tract of private and state owned land which contains approximately 3.1 million cubic yards of tailings and associated contaminated soils. The vicinity properties are homes, businesses, public buildings, and vacant lots which may have been contaminated during construction by the use of tailings as building material. An estimated 3465 vicinity properties would be cleaned up during remedial action of the tailings pile. The tailings were produced by the former Climax Uranium Company which processed uranium ore, which it sold to the US Atomic Energy Commission from 1951 to 1966 and to private sources from 1966 to 1970. This statement evaluates six alternatives for stabilization and disposal of the tailings and other contaminated materials: (1) No action. (2) Stabilization at the Grand Junction site. (3) Disposal at the Cheney Reservoir site with truck transport. (4) Disposal at the Cheney Reservoir site with train and truck transport. (5) Disposal at the Two Road site with truck transport. (6) Disposal at the Two Road site with train and truck transport. All of the alternatives except no action include remedial action at an estimated 3465 vicinity properties. Alternative 3 is DOE`s preferred alternative.

  2. Afghanistan environmental profile. Phase 1. Final report

    SciTech Connect

    Not Available

    1992-06-01

    Afghanistan's environment, already scarred by 12 years of conflict, is likely to undergo severe stress as external and internal refugees are resettled, according to this preliminary environmental profile. Following an introduction, Chapter 2 discusses the state of Afghanistan's environment in 1978 prior to the Soviet invasion, while Chapter 3 documents the environmental impacts of events since that time, including population relocation, deforestation, and locust and sunn-pest infestations. Chapter 4 examines major environmental areas (vegetation, wildlife, soil erosion, pesticides, public health, environmental infrastructure, energy, and air quality) with respect to both existing conditions and what is likely to occur when resettlement begins in earnest. Chapter 5 presents potential mitigation measures, including a set of environmental guidelines for the Government of Afghanistan. Chapter 6 discusses the Geographic Information System being developed under USAID's Agricultural Services Support Program; it discusses the extent to which GIS data can contribute to environmental studies, and vice versa.

  3. 16 CFR 1021.14 - Environmental impact statement.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 16 Commercial Practices 2 2013-01-01 2013-01-01 false Environmental impact statement. 1021.14 Section 1021.14 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION GENERAL ENVIRONMENTAL REVIEW Contents of Environmental Review Documents § 1021.14 Environmental impact statement. (a) Draft and final...

  4. 16 CFR 1021.14 - Environmental impact statement.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 16 Commercial Practices 2 2012-01-01 2012-01-01 false Environmental impact statement. 1021.14 Section 1021.14 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION GENERAL ENVIRONMENTAL REVIEW Contents of Environmental Review Documents § 1021.14 Environmental impact statement. (a) Draft and final...

  5. 16 CFR 1021.14 - Environmental impact statement.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 16 Commercial Practices 2 2011-01-01 2011-01-01 false Environmental impact statement. 1021.14 Section 1021.14 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION GENERAL ENVIRONMENTAL REVIEW Contents of Environmental Review Documents § 1021.14 Environmental impact statement. (a) Draft and final...

  6. 16 CFR 1021.14 - Environmental impact statement.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 16 Commercial Practices 2 2014-01-01 2014-01-01 false Environmental impact statement. 1021.14 Section 1021.14 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION GENERAL ENVIRONMENTAL REVIEW Contents of Environmental Review Documents § 1021.14 Environmental impact statement. (a) Draft and final...

  7. Boise geothermal injection well: Final environmental assessment

    SciTech Connect

    1997-12-31

    The City of Boise, Idaho, an Idaho Municipal Corporation, is proposing to construct a well with which to inject spent geothermal water from its hot water heating system back into the geothermal aquifer. Because of a cooperative agreement between the City and the US Department of Energy to design and construct the proposed well, compliance to the National Environmental Policy Act (NEPA) is required. Therefore, this Environmental Assessment (EA) represents the analysis of the proposed project required under NEPA. The intent of this EA is to: (1) briefly describe historical uses of the Boise Geothermal Aquifer; (2) discuss the underlying reason for the proposed action; (3) describe alternatives considered, including the No Action Alternative and the Preferred Alternative; and (4) present potential environmental impacts of the proposed action and the analysis of those impacts as they apply to the respective alternatives.

  8. Impact Site: Cassini's Final Image

    NASA Image and Video Library

    2017-09-15

    This monochrome view is the last image taken by the imaging cameras on NASA's Cassini spacecraft. It looks toward the planet's night side, lit by reflected light from the rings, and shows the location at which the spacecraft would enter the planet's atmosphere hours later. A natural color view, created using images taken with red, green and blue spectral filters, is also provided (Figure 1). The imaging cameras obtained this view at approximately the same time that Cassini's visual and infrared mapping spectrometer made its own observations of the impact area in the thermal infrared. This location -- the site of Cassini's atmospheric entry -- was at this time on the night side of the planet, but would rotate into daylight by the time Cassini made its final dive into Saturn's upper atmosphere, ending its remarkable 13-year exploration of Saturn. The view was acquired on Sept. 14, 2017 at 19:59 UTC (spacecraft event time). The view was taken in visible light using the Cassini spacecraft wide-angle camera at a distance of 394,000 miles (634,000 kilometers) from Saturn. Image scale is about 11 miles (17 kilometers). The original image has a size of 512x512 pixels. A movie is available at https://photojournal.jpl.nasa.gov/catalog/PIA21895

  9. 78 FR 26063 - Central Utah Project Completion Act; East Hobble Creek Restoration Project Final Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ... significant impact on the quality of the human environment, and that an environmental impact statement is not required. ADDRESSES: Copies of the Final Environmental Assessment and Finding of No Significant Impact are... Reclamation Mitigation and Conservation Commission each signed a Finding of No Significant Impact...

  10. Gulf of Mexico Sales 139 and 141: Central and western planning areas. Final Environmental Impact Statement: Volume 2, Sections 4.D through 9

    SciTech Connect

    Not Available

    1991-11-01

    This environmental impact statement (EIS) addresses two proposed Federal actions, lease Sales 139 and 141, that will offer for lease Gulf of Mexico Outer Continental Shelf (OCS) areas that may contain economically recoverable oil and gas resources. The lease sales are proposed for 1992 and include lease blocks in the Central Gulf of Mexico Planning Area (CPA) and Western Gulf of Mexico Planning Area (WPA). Approximately 9700 blocks will be available for lease under the two proposed actions; only a small percentage is expected to be actually leased. On average, 432 blocks in the Central Gulf and 279 blocks in the Western Gulf have been leased in individual Gulf of Mexico OCS lease sales since 1984. Of the blocks that will be leased as a result of the two proposed actions, only a portion will be drilled and will likely result in subsequent production. The analytical methods used in this EIS have been formulated over a period of years and are based on the methodology outlined within the National Environmental Policy Act (NEPA). The first step of the analysis is the identification of significant environmental and socioeconomic resources through the scoping process. A range of impact levels is then defined for each of the significant resources to be analyzed. A range of energy resource estimates is derived from geologic and economic assumptions and a range of alternatives to the proposed action is established. Estimated levels of exploration and development actively are assumed for the purposes of the analysis. A scoping process was used to obtain information and comments on the proposed actions and the potential environmental effects from diverse interests, including the affected States, Federal agencies, the petroleum industry, environmental and public interest groups, and concerned individuals.

  11. Final Environmental Assessment and Finding of No Significant Impact: White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam

    SciTech Connect

    N /A

    2003-04-23

    Bonneville Power Administration (BPA) is proposing to fund the White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam Project. The project proposes to continue to carry out harvest monitoring and stock status updates coordinated with fisheries management planning, annual young-of-the year recruitment indexing, research, experimental artificial propagation, and transport of white sturgeon to less densely populated areas of the river(s). Additionally, release of hatchery-reared juveniles is proposed to evaluate release strategies. Actions will take place in the following Columbia River mainstem reaches: Bonneville, The Dalles, John Day, and McNary Reservoirs; Hanford Reach, as well as the Wanapum and Rock Island Reservoirs; and the following Snake River mainstem reaches: Ice Harbor, Lower Monumental and Little Goose Reservoirs. Spawning and rearing are undertaken at established hatcheries at McNary Dam and also the Abernathy Fish Technology Center. BPA has prepared an Environmental Assessment (EA) (DOE/EA-1367, April 2003) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and BPA is issuing this Finding of No Significant Impact (FONSI).

  12. Final Environmental Assessment for the Boles Wells Field Perimeter Security Improvement Project Otero County, New Mexico

    DTIC Science & Technology

    2005-10-03

    findings of the Final Environmental Assessment of the Boles Wells Field Security Improvement Project, dated 3 Oct 05, no significant impact on human health ...Other resource impacts identified in the EA were considered to determine the potential for high and adverse health and environmental impacts to human ...as necessary, to protect human health and the environment. - Noted. To be accomplished asnecesary. Final Environmental Assessment - Boles Wells

  13. South Fork Tolt River Hydroelectric Project : Adopted Portions of a 1987 Federal Energy Regulatory Commission`s Final Environmental Impact Statement.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-07-01

    The South Fork Tolt River Hydroelectric Project that world produce 6.55 average megawatts of firm energy per year and would be sited in the Snohomish River Basin, Washington, was evaluated by the Federal Energy Regulatory commission (FERC) along with six other proposed projects for environmental effects and economic feasibility Based on its economic analysis and environmental evaluation of the project, the FERC staff found that the South Fork Tolt River Project would be economically feasible and would result in insignificant Impacts if sedimentation issues could be resolved. Upon review, the BPA is adopting portions of the 1987 FERC FEIS that concern the South Fork Tolt River Hydroelectric Project and updating specific sections in an Attachment.

  14. Arctic National Wildlife Refuge, Alaska, Coastal Plain Resource Assessment: Report and recommendation to the Congress of the United States and final legislative environmental impact statement

    USGS Publications Warehouse

    ,

    1987-01-01

    The Arctic National Wildlife Refuge, in the northeastern corner of Alaska, was first established as the Arctic National Wildlife Range by Public Land Order 2214 in 1960, for the purpose of preserving unique wildlife, wilderness, and recreational values. The original 8.9-millionacre Range was withdrawn from all forms of appropriation under the public land laws, including mining laws but not including mineral leasing laws. This order culminated extensive efforts begun more than a decade earlier to preserve this unique part of Alaska. The following report analyzes the potential environmental consequences of five management alternatives for the coastal plain, ranging from opening for lease of the entire area for oil and gas development, to wilderness designation. A legislative environmental impact statement has been integrated into the report.

  15. Impacts of proposed RCRA regulations and other related federal environmental regulations on Fossil Fuel-Fired Facilities: Final report, Volume 1

    SciTech Connect

    Not Available

    1987-03-01

    In order to fulfill its responsibilities, DOE contracted with Engineering-Science to perform a multi-phase engineering and economics study to evaluate the impact of the proposed RCRA regulations and other related federal environmental regulations on coal-fired utilities. This Interim Phase I report presents the findings of the impacts of proposed RCRA and related federal regulations on the utility sector fossil fuel-fired facilities. Subsequent phases involve parallel engineering studies on the industrial sector as well as economic evaluations. The framework of this study was based on the development and analysis (engineering and economic) of four regulatory scenarios for the disposal of fly ash, bottom ash and FGD sludge from the utility industry.

  16. 75 FR 61770 - Notice of Availability of the Final Programmatic Environmental Assessment and Finding of No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-06

    ... agency will issue a Finding of No Significant Impact (FONSI). A Programmatic Environmental Assessment... SECURITY U.S. Customs and Border Protection Notice of Availability of the Final Programmatic Environmental... Homeland Security. ACTION: Notice of availability. SUMMARY: A final Programmatic Environmental...

  17. ENVIRONMENTAL IMPACT ASSESSMENTS

    EPA Science Inventory

    This brochure is part of a series of information packages prepared by the United States Environmental Protection Agency (EPA). Aimed at the international community, the packages focus on key environmental and public health issues being investigated by EPA. The products highligh...

  18. ENVIRONMENTAL IMPACT ASSESSMENTS

    EPA Science Inventory

    This brochure is part of a series of information packages prepared by the United States Environmental Protection Agency (EPA). Aimed at the international community, the packages focus on key environmental and public health issues being investigated by EPA. The products highligh...

  19. Report Summary, Final Hells Canyon Environmental Investigation.

    SciTech Connect

    United States. Bonneville Power Administration.

    1985-01-01

    . This document summarizes the findings of the final EI in the following areas: (1) natural features, water use, and air and water quality; (2) fish, wildlife, and vegetation; (3) land use, recreation, and aesthetics; and (4) historical and archaeological resources. The EI provides information to be used by IPCo as they assess the effect on the system operations (power and nonpower) resulting from Water Budget participation. BPA and IPCo are continuing to discuss the prospects for IPCo's involvement in implementation of the Water Budget on the Snake River. When IPCo reaches a decision on whether and to what extent it wishes to participate in a Water Budget agreement with BPA, the proposed agreement will be subject to analysis under the National Environmental Policy Act (NEPA). That analysis will consider alternatives, significance of impacts to the environment, and mitigative measures.

  20. Environmental impact statements. Second edition

    SciTech Connect

    Bregman, J.I.

    1999-11-01

    This book covers all the requirements for a wide variety of environmental impact statements (EISs) on the federal, state, and local levels, including a new chapter devoted to environmental justice. Topics of discussion include the following: purpose of the environment; the legal basis for environmental impact statements; the process of preparing EISs; public participation; the natural environment earth resources; the natural environment: biology; the Man-made environment: surface water, groundwater, air, noise, hazards and nuisances, historic and cultural resources, transportation, socio-economics and environmental justice.

  1. 78 FR 75919 - Environmental Impact Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-13

    ... AGENCY Environmental Impact Statements; Notice of Availability Responsible Agency: Office of Federal... Environmental Impact Statements filed 12/02/2013 through 12/06/2013 pursuant to 40 CFR 1506.9. Notice Section... . EIS No. 20130356, Final EIS, FRA, MS, Tupelo Railroad Relocation Planning and Environmental...

  2. Environmental Impact Statement Filing Guidance

    EPA Pesticide Factsheets

    Describes how to submit an environmental impact statement through the e-NEPA electronic submission system. Describes how EPA submits a notice of availability in to the Federal Register and how the comment time period if set forth.

  3. Final Environmental Impact Statement for Treating Transuranic (TRU)/Alpha Low-level Waste at the Oak Ridge National Laboratory Oak Ridge, Tennessee

    SciTech Connect

    N /A

    2000-06-30

    The DOE proposes to construct, operate, and decontaminate/decommission a TRU Waste Treatment Facility in Oak Ridge, Tennessee. The four waste types that would be treated at the proposed facility would be remote-handled TRU mixed waste sludge, liquid low-level waste associated with the sludge, contact-handled TRU/alpha low-level waste solids, and remote-handled TRU/alpha low-level waste solids. The mixed waste sludge and some of the solid waste contain metals regulated under the Resource Conservation and Recovery Act and may be classified as mixed waste. This document analyzes the potential environmental impacts associated with five alternatives--No Action, the Low-Temperature Drying Alternative (Preferred Alternative), the Vitrification Alternative, the Cementation Alternative, and the Treatment and Waste Storage at Oak Ridge National Laboratory (ORNL) Alternative.

  4. Final Environmental Impact Statement to construct and operate a facility to receive, store, and dispose of 11e.(2) byproduct material near Clive, Utah (Docket No. 40-8989)

    SciTech Connect

    Not Available

    1993-08-01

    A Final Environmental Impact Statement (FEIS) related to the licensing of Envirocare of Utah, Inc.`s proposed disposal facility in Tooele county, Utah (Docket No. 40-8989) for byproduct material as defined in Section 11e.(2) of the Atomic Energy Act, as amended, has been prepared by the Office of Nuclear Material Safety and Safeguards. This statement describes and evaluates the purpose of and need for the proposed action, the alternatives considered, and the environmental consequences of the proposed action. The NRC has concluded that the proposed action evaluated under the National Environmental Policy Act of 1969 (NEPA) and 10 CFR Part 51, is to permit the applicant to proceed with the project as described in this Statement.

  5. The Environmental Impact.

    ERIC Educational Resources Information Center

    Texley, Juliana

    1991-01-01

    The impact of oil spills and oil fires in the Persian Gulf is discussed. Activities to be done in the classroom that simulate oil spills are presented. Sample discussion questions and direction for the activities are included. (KR)

  6. The Environmental Impact.

    ERIC Educational Resources Information Center

    Texley, Juliana

    1991-01-01

    The impact of oil spills and oil fires in the Persian Gulf is discussed. Activities to be done in the classroom that simulate oil spills are presented. Sample discussion questions and direction for the activities are included. (KR)

  7. Hells Canyon Environmental Investigation : Final Report.

    SciTech Connect

    United States. Bonneville Power Administration.

    1985-01-01

    The Water Budget plan would provide additional flows in the Columbia and Snake Rivers between April 15 and June 15 to improve the survival of downstream migrating salmon and steelhead. The plan calls for 20,000 cubic feet per second-months (beyond the firm power flow) to be delivered to Lower Granite pool as the Snake River contribution to the Water Budget. This water would come from Idaho Power Company's (IPCo) Hells Canyon Complex (principally, Brownlee Reservoir) and the US Army Corps of Engineers' Dworshak Reservoir. This report contains the results of an environmental investigation of the nonpower impacts on the Hells Canyon Complex investigation. The environmental investigation evaluated three Water Budget scenarios, or levels of participation, developed by IPCo. These scenarios involve drawdowns of Brownlee Reservoir to three elevations, or floor levels (2036, 2050, and 2065), for Water Budget flows. A total of nine discipline areas were studied. These include natural features (geology); water use; water quality; fish, botanical, and wildlife resources; air quality; land use; historical and archeological resources; recreational resources; and aesthetic resources. Within each discipline, the report presents the existing conditions, the potential impacts associated with each scenario, information deficiencies and needed studies, and references.

  8. Environmental justification for railroad electrification. Final report

    SciTech Connect

    Bernard, M.J. III; Thorpe, A.B.

    1993-12-01

    In a 1991 workshop, electric utility managers asked the Electric Power Research Institute (EPRI) to address the question of railroad electrification in light of both urban air problems associated with transportation and our national transportation system`s dependence on petroleum fuels. In response, EPRI presents this economic and environmental analysis. This analysis is different from many previous studies in two ways: it determines the capital and operating cost differentials between diesel locomotive trains and electric locomotive trains; it also assigns a dollar value to the environmental costs associated with air pollution from diesel and electric train operations. This study`s purpose is to compare financial costs of rail electrification with environmental costs from air emissions impacts in four case studies: Boston, Chicago, Los Angeles, and San Francisco. These urban regions were chosen because they have different railroad characteristics and they all have air quality problems. This study will present a snapshot of the year 2000 to compare the economics in each region of two scenarios: the rail lines remain diesel power or are electrified. Because of the increase in capital and operating cost, rail electrification is not financially viable in any of these regions. Yet when the benefit of reduced air emissions, typically an {open_quotes}external{close_quotes} value, is included in the analysis, rail electrification may be economically viable.

  9. 24 CFR 58.60 - Preparation and filing of environmental impact statements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... environmental impact statements. 58.60 Section 58.60 Housing and Urban Development Office of the Secretary... Environmental Impact Statements § 58.60 Preparation and filing of environmental impact statements. (a) The responsible entity must prepare the draft environmental impact statement (DEIS) and the final environmental...

  10. 24 CFR 58.60 - Preparation and filing of environmental impact statements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... environmental impact statements. 58.60 Section 58.60 Housing and Urban Development Office of the Secretary... Environmental Impact Statements § 58.60 Preparation and filing of environmental impact statements. (a) The responsible entity must prepare the draft environmental impact statement (DEIS) and the final environmental...

  11. 24 CFR 58.60 - Preparation and filing of environmental impact statements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... environmental impact statements. 58.60 Section 58.60 Housing and Urban Development Office of the Secretary... Environmental Impact Statements § 58.60 Preparation and filing of environmental impact statements. (a) The responsible entity must prepare the draft environmental impact statement (DEIS) and the final environmental...

  12. 24 CFR 58.60 - Preparation and filing of environmental impact statements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... environmental impact statements. 58.60 Section 58.60 Housing and Urban Development Office of the Secretary... Environmental Impact Statements § 58.60 Preparation and filing of environmental impact statements. (a) The responsible entity must prepare the draft environmental impact statement (DEIS) and the final environmental...

  13. 24 CFR 58.60 - Preparation and filing of environmental impact statements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... environmental impact statements. 58.60 Section 58.60 Housing and Urban Development Office of the Secretary... Environmental Impact Statements § 58.60 Preparation and filing of environmental impact statements. (a) The responsible entity must prepare the draft environmental impact statement (DEIS) and the final environmental...

  14. 7 CFR 1955.136 - Environmental Assessment (EA) and Environmental Impact Statement (EIS).

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Environmental Impact Statement (EIS). (a) Prior to a final decision on some disposal actions, an environmental assessment must be made and when necessary, an enviornmental impact statement. Detailed guidance on when and... Impact Statement (EIS). 1955.136 Section 1955.136 Agriculture Regulations of the Department of...

  15. 7 CFR 1955.136 - Environmental Assessment (EA) and Environmental Impact Statement (EIS).

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Environmental Impact Statement (EIS). (a) Prior to a final decision on some disposal actions, an environmental assessment must be made and when necessary, an enviornmental impact statement. Detailed guidance on when and... Impact Statement (EIS). 1955.136 Section 1955.136 Agriculture Regulations of the Department of...

  16. 7 CFR 1955.136 - Environmental Assessment (EA) and Environmental Impact Statement (EIS).

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Environmental Impact Statement (EIS). (a) Prior to a final decision on some disposal actions, an environmental assessment must be made and when necessary, an enviornmental impact statement. Detailed guidance on when and... Impact Statement (EIS). 1955.136 Section 1955.136 Agriculture Regulations of the Department of...

  17. 7 CFR 1955.136 - Environmental Assessment (EA) and Environmental Impact Statement (EIS).

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Environmental Impact Statement (EIS). (a) Prior to a final decision on some disposal actions, an environmental assessment must be made and when necessary, an enviornmental impact statement. Detailed guidance on when and... Impact Statement (EIS). 1955.136 Section 1955.136 Agriculture Regulations of the Department of...

  18. Environmental Mission Impact Assessment

    DTIC Science & Technology

    2008-01-01

    System Agency’s (DISA) Federated Search service. The mission impacts can be generated for a general rectangular area, or generated for routes, route...that respond to queries (format- ted according to DISA’s Federated Search specifi- FIGURE 2 EVIS service-oriented architecture design, illustrating the

  19. Mallet impact test. Final report

    SciTech Connect

    West, G.T.

    1982-09-01

    Small and large scale apparatus were constructed to mechanically-simulate forces and durations measured on instrumented mallets during lathe centering operations using mock explosive billets. Tests were conducted on LX-10 samples. In addition to normal mallet impacts, simulation of glancing blows was attempted. There were no detectable reactions of the LX-10, although the simulated glancing blows were conducted at force levels high enough to melt the plastic hammer tip. These levels are considered much higher than those within a human's capability. It is concluded that the probability of LX-10 initiation as a result of an operator mallet blow is very unlikely.

  20. 76 FR 54525 - Notice of Availability of a Final Environmental Assessment (Final EA) and a Finding of No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-01

    ...The Federal Aviation Administration (FAA) is issuing this notice to advise the public that the FAA has prepared, and approved on August 8, 2011, a Finding of No Significant Impact (FONSI)/Record of Decision (ROD) based on the Final Environmental Assessment (Final EA) for a Proposed Airport Traffic Control Tower (ATCT) with Associated Base Building at University of Illinois Willard Airport......

  1. 75 FR 42820 - Notice of Availability of a Final Environmental Assessment (Final EA) and a Finding of No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-22

    ...The Federal Aviation Administration (FAA) is issuing this notice to advise the public that the FAA has prepared, and approved on April 16, 2010, a Finding of No Significant Impact (FONSI)/Record of Decision (ROD) based on the Final Environmental Assessment (Final EA) for a Proposed Airport Traffic Control Tower (ATCT) with Associated Base Building at Kalamazoo/Battle Creek International......

  2. 75 FR 62133 - Notice of Availability of Final Environmental Assessment (FINAL EA) and a Finding of No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-07

    ...The Centers for Disease Control and Prevention (CDC), located within the Department of Health and Human Services (HHS) is issuing this notice to advise the public that the CDC has prepared, and signed on September 7, 2010, a Finding of No Significant Impact (FONSI) based on the Final Environmental Assessment (FINAL EA) for Land Purchase, Access Road Construction and Access Tunnel Construction,......

  3. 76 FR 41323 - Notice of Availability of the Final Environmental Assessment for the Metropolitan Branch Trail

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-13

    ... (40 CFR parts 1500- 1508); and the FHWA Environmental Impact and Related Procedures (23 CFR 771). FOR... ADMINISTRATION Notice of Availability of the Final Environmental Assessment for the Metropolitan Branch Trail... Transportation; in cooperation with the National Park Service. ACTION: Notice of availability of the Final...

  4. Final Environmental Impact Statement for the Proposed Relocation of Technical Area 18 Capabilities and Materials at the Los Alamos National Laboratory

    SciTech Connect

    N /A

    2002-09-20

    The National Nuclear Security Administration, a separately organized agency within DOE, is responsible for providing the Nation with nuclear weapons, ensuring the safety and reliability of those nuclear weapons, and supporting programs that reduce global nuclear proliferation. These missions are accomplished with a core team of highly trained nuclear experts. One of the major training facilities for these personnel is located at Technical Area 18 (TA-18), within the Los Alamos National Laboratory (LANL), Los Alamos, New Mexico. Principal TA-18 operational activities involve research in and the design, development, construction, and application of experiments on nuclear criticality. Though TA-18 is judged to be secure by DOE's independent inspection office, its buildings and infrastructure are from 30 to more than 50 years old and are increasingly expensive to maintain and operate. Additionally, the TA-18 operations are located in a relatively isolated area, resulting in increasingly high costs to maintain a security Category I infrastructure. NNSA wishes to maintain the important capabilities currently provided at TA-18 in a manner that reduces the long-term costs for safeguards and security. NNSA proposes to accomplish this by relocating the TA-18 security Category I/II capabilities and materials to new locations. The TA-18 Relocation EIS evaluates the potential direct, indirect, and cumulative environmental impacts associated with this proposed action at the following DOE sites: (1) a different site at LANL at Los Alamos, New Mexico; (2) the Sandia National Laboratories/New Mexico at Albuquerque, New Mexico; (3) the Nevada Test Site near Las Vegas, Nevada (the Preferred Alternative); and (4) the Argonne National Laboratory-West near Idaho Falls, Idaho. The EIS also analyzes the alternatives of upgrading the existing TA-18 facilities and the No Action Alternative of maintaining the operations at the current TA-18 location.

  5. OTEC power system development and environmental impacts

    SciTech Connect

    Sather, N.F.

    1980-02-20

    Ocean Thermal Energy Conversion (OTEC) is a proven solar energy technology with enormous potential as a supplier of electric power. However, before this potential can be realized there must be significant reductions in OTEC plant investment costs estimated for state-of-the-art designs. A comprehensive survey of the opportunities for reducing costs of the heat exchangers and other components of the power system of closed-cycle OTEC plants is given. These cost-reducing inventives are strongly dependent on the extent to which the environmental impacts of OTEC plants will have to be controlled. The environmental concerns associated with the deployment of OTEC plants are reviewed, and approaches to alleviating these concerns are described. Finally, the key roles of the OTEC-1 component test facility and the OTEC pilot plant planned for a 1984 start up in providing information about the critical power system development and environmental impact problems are summarized.

  6. 77 FR 15121 - Final Land Protection Plan and Final Environmental Assessment for Everglades Headwaters National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-14

    ... Fish and Wildlife Service Final Land Protection Plan and Final Environmental Assessment for Everglades... of our Final Land Protection Plan (LPP) and Final Environmental Assessment (EA) for the recently... conservation landscape; to provide quality habitats for native wildlife diversity and at-risk species; to...

  7. 75 FR 7536 - Environmental Impact Statement: Ottawa County, MI

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-19

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Federal Highway Administration Environmental Impact Statement: Ottawa County, MI AGENCY: Federal Highway Administration (FHWA), U.S. DOT. ACTION: Notice of Availability (NOA) of the Final Environmental Impact...

  8. Environmental Impact of Riverbank Revetment,

    DTIC Science & Technology

    1975-05-01

    authorized and completed in 1965 by the Louisville District Corp of Engineers. The revetment involved the aquisition of land, placing of a dumped gravel...simplified approach is ncedcd for the impact assessment of bank revetments which will provide an inexpensive pragmatic environmental assessment. In most

  9. 75 FR 77896 - Notice of Availability: Tamiami Trail Modifications: Next Steps Project, Final Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-14

    ..., Environmental Impact Analysis, and Decision- making), the NPS announces the availability of a Final....'' DATES: The NPS will execute a Record of Decision (ROD) no sooner than 30 days following publication by...

  10. 49 CFR 520.23 - Preparation of draft environmental impact statements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... environmental issues involved and take responsibility for the scope and content of draft and final environmental... 49 Transportation 6 2014-10-01 2014-10-01 false Preparation of draft environmental impact... ENVIRONMENTAL IMPACTS Procedures § 520.23 Preparation of draft environmental impact statements. (a) Planning...

  11. 49 CFR 520.23 - Preparation of draft environmental impact statements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... environmental issues involved and take responsibility for the scope and content of draft and final environmental... 49 Transportation 6 2013-10-01 2013-10-01 false Preparation of draft environmental impact... ENVIRONMENTAL IMPACTS Procedures § 520.23 Preparation of draft environmental impact statements. (a) Planning...

  12. 49 CFR 520.23 - Preparation of draft environmental impact statements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... environmental issues involved and take responsibility for the scope and content of draft and final environmental... 49 Transportation 6 2012-10-01 2012-10-01 false Preparation of draft environmental impact... ENVIRONMENTAL IMPACTS Procedures § 520.23 Preparation of draft environmental impact statements. (a) Planning...

  13. 49 CFR 520.23 - Preparation of draft environmental impact statements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... environmental issues involved and take responsibility for the scope and content of draft and final environmental... 49 Transportation 6 2010-10-01 2010-10-01 false Preparation of draft environmental impact... ENVIRONMENTAL IMPACTS Procedures § 520.23 Preparation of draft environmental impact statements. (a) Planning...

  14. 40 CFR 1502.19 - Circulation of the environmental impact statement.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... impact statement. 1502.19 Section 1502.19 Protection of Environment COUNCIL ON ENVIRONMENTAL QUALITY ENVIRONMENTAL IMPACT STATEMENT § 1502.19 Circulation of the environmental impact statement. Agencies shall circulate the entire draft and final environmental impact statements except for certain appendices as...

  15. 40 CFR 1502.19 - Circulation of the environmental impact statement.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... impact statement. 1502.19 Section 1502.19 Protection of Environment COUNCIL ON ENVIRONMENTAL QUALITY ENVIRONMENTAL IMPACT STATEMENT § 1502.19 Circulation of the environmental impact statement. Agencies shall circulate the entire draft and final environmental impact statements except for certain appendices...

  16. 40 CFR 1502.19 - Circulation of the environmental impact statement.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... impact statement. 1502.19 Section 1502.19 Protection of Environment COUNCIL ON ENVIRONMENTAL QUALITY ENVIRONMENTAL IMPACT STATEMENT § 1502.19 Circulation of the environmental impact statement. Agencies shall circulate the entire draft and final environmental impact statements except for certain appendices...

  17. 40 CFR 1502.19 - Circulation of the environmental impact statement.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... impact statement. 1502.19 Section 1502.19 Protection of Environment COUNCIL ON ENVIRONMENTAL QUALITY ENVIRONMENTAL IMPACT STATEMENT § 1502.19 Circulation of the environmental impact statement. Agencies shall circulate the entire draft and final environmental impact statements except for certain appendices...

  18. 40 CFR 1502.19 - Circulation of the environmental impact statement.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... impact statement. 1502.19 Section 1502.19 Protection of Environment COUNCIL ON ENVIRONMENTAL QUALITY ENVIRONMENTAL IMPACT STATEMENT § 1502.19 Circulation of the environmental impact statement. Agencies shall circulate the entire draft and final environmental impact statements except for certain appendices...

  19. 75 FR 31834 - Adoption of Environmental Impact Statement; Availability of an Environmental Reevaluation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-04

    ... Federal Railroad Administration Adoption of Environmental Impact Statement; Availability of an...). ACTION: Adoption and Recirculation of Final Environmental Impact Statement and Notice of Availability of... regarding the filing of EISs, FRA has provided the EPA with a notice of adoption and five copies of the FTA...

  20. Environmental impact of geopressure - geothermal cogeneration facility on wetland resources and socioeconomic characteristics in Louisiana Gulf Coast region. Final report, October 10, 1983-September 31, 1984

    SciTech Connect

    Smalley, A.M.; Saleh, F.M.S.; Fontenot, M.

    1984-08-01

    Baseline data relevant to air quality are presented. The following are also included: geology and resource assessment, design well prospects in southwestern Louisiana, water quality monitoring, chemical analysis subsidence, microseismicity, geopressure-geothermal subsidence modeling, models of compaction and subsidence, sampling handling and preparation, brine chemistry, wetland resources, socioeconomic characteristics, impacts on wetlands, salinity, toxic metals, non-metal toxicants, temperature, subsidence, and socioeconomic impacts. (MHR)

  1. Environmental impact assessment in Brazil

    SciTech Connect

    Fowler, H.G.; De Aguiar, A.M.D. . Dept. de Ecologia e Programa de Pos- graduac ao em Analise Ambiental)

    1993-05-01

    Brazilian environmental impact assessment (EIA) had a relatively late birth and is still far from being operative by international standards. Currently, geological, economic, and social considerations are more highly valued. Nevertheless, EIA has become important in shaping governmental policy. The state of Sao Paulo is responsible for 40% of all EIAs produced in Brazil, and the number of EIAs produced is proportional to stat population density.

  2. PROFILE: Integrating Sustainability and Environmental Impact Assessment

    PubMed

    LAWRENCE

    1997-01-01

    / Environmental impact assessment (EIA) has been identified as an important instrument for facilitating sustainability. However, to do so requires the integration of sustainability into EIA theory and practice. The sustainability concept is a valid and important environmental management perspective. However, many issues and obstacles need to be addressed further if the concept is to be translated into practical strategies. Sustainability can potentially infuse EIA with a clearer sense of direction, an ethical foundation, a mechanism for establishing priorities and assessing choices, and a means of linking EIA to other environmental management instruments. Conceptually, EIA and sustainability can be integrated, but frameworks should be refined, adpated to context, and linked to related initiatives. Sustainability should be explicitly incorporated into EIA legislation, guidelines, and institutional arrangements. An experimental approach to testing, assessing, and sharing experiences is suggested.A framework is first presented that defines and characterizes the sustainability concept. A further framework is then described for integrating sustainability into EIA at the conceptual level. The integration of sustainability and EIA at the regulatory level is next addressed through an overview of sustainability initiatives in EIA requirements in Canada. The Canadian examples include many promising initiatives but these and other experiences will need to be monitored, shared, and integrated into comprehensive environmental management strategies. Finally, means of incorporating sustainability into each activity in the EIA planning process are identified.KEY WORDS: Sustainability; Environmental impact assessment

  3. Puget Sound Dredged Disposal Analysis (PSDDA). Final Environmental Impact Statement Unconfined Open-Water Disposal for Dredged Material, Phase 2. (North and South Puget Sound)

    DTIC Science & Technology

    1989-09-01

    recent years, as public policy has been to protect environmentally important tidal areas, wetlands , and marshes. Consequently, nearshore disposal options...Material into Puget Sound 4-24 (5) Executive Order 11990, Protection of Wetlands 4-24 (6) Executive Order 11988, Flood Plain Management 4-24 v vii...TABLE OF CONTENTS (con.) Paragraph Page (5) Executive Order 11990, Protection of Wetlands !i-l,7 (6) Executive Order 11988, Flood Plain Management 4-47 (7

  4. Final Supplemental Environmental Assessment for U.S. 98 at the Entrance to Hurlburt Field. Finding of No Significant Impact and Finding of No Practicable Alternative

    DTIC Science & Technology

    2013-06-01

    Atkins Utility Adjustment plans d. Added base utility relocations including water, sanitary sewer, buried electric, communications, and petroleum...determined that several changes to the Proposed Action were located in the Area of Potential Effect (APE) studied in the 2010 EA, or had no effect on the...of their effects to environmental resources is required. Changes Carried Forward For Further Analysis (2013 SEA Section 2.4, pages 2-2 and 2-3

  5. The Space Environmental Impact System

    NASA Astrophysics Data System (ADS)

    Kihn, E. A.

    2009-12-01

    The Space Environmental Impact System (SEIS) is an operational tool for incorporating environmental data sets into DoD Modeling and Simulation (M&S) which allows for enhanced decision making regarding acquisitions, testing, operations and planning. The SEIS system creates, from the environmental archives and developed rule-base, a tool for describing the effects of the space environment on particular military systems, both historically and in real-time. The system uses data available over the web, and in particular data provided by NASA’s virtual observatory network, as well as modeled data generated specifically for this purpose. The rule base system developed to support SEIS is an open XML based model which can be extended to events from any environmental domain. This presentation will show how the SEIS tool allows users to easily and accurately evaluate the effect of space weather in terms that are meaningful to them as well as discuss the relevant standards used in its construction and go over lessons learned from fielding an operational environmental decision tool.

  6. Oakland Harbor. Deep-Draft Navigation Improvements. Design Memorandum Number 1, General Design and Final Supplement 1 to the Environmental Impact Statement, Alameda County, California.

    DTIC Science & Technology

    1988-03-01

    water contamination, potential uptake by plants and animals , and risk to human health will remain possible problems. 0 - -2 , , 5) A =u. tis ec -’tem...Oakland Harbor project also may be addressed. The technical panel’s findings and oonoluaions shall address the enviroxmental/ health impacts and risks...chain interactions. It is unlikely that pathogenic organisms which may cause a public health hazard either directly or through crtamination of fisheries

  7. Final Environmental Impact Statement for the Designation of a Disposal Site for Dredged Material in Western Long Island Sound WLIS III.

    DTIC Science & Technology

    1982-02-01

    Hall, 1977). Studies in the New York Bight Mud Dump have indicated that mercury, cadmium, PCB and pesticide levels in the tissues of the whiting...that any damage done must trr -ii ntents arid purposes hc considered irrevocable. Because of this fact any proposed dumping cannot be evaluated merely...polluted city harbors and contains heavy metals, petro-chemicals, pesticides and related pollutants. The State’s Environ- mental Impact Statement

  8. Underwater noise modelling for environmental impact assessment

    SciTech Connect

    Farcas, Adrian; Thompson, Paul M.; Merchant, Nathan D.

    2016-02-15

    Assessment of underwater noise is increasingly required by regulators of development projects in marine and freshwater habitats, and noise pollution can be a constraining factor in the consenting process. Noise levels arising from the proposed activity are modelled and the potential impact on species of interest within the affected area is then evaluated. Although there is considerable uncertainty in the relationship between noise levels and impacts on aquatic species, the science underlying noise modelling is well understood. Nevertheless, many environmental impact assessments (EIAs) do not reflect best practice, and stakeholders and decision makers in the EIA process are often unfamiliar with the concepts and terminology that are integral to interpreting noise exposure predictions. In this paper, we review the process of underwater noise modelling and explore the factors affecting predictions of noise exposure. Finally, we illustrate the consequences of errors and uncertainties in noise modelling, and discuss future research needs to reduce uncertainty in noise assessments.

  9. Theory and Practice of Environmental Impact Analysis

    ERIC Educational Resources Information Center

    Mason, Peter F.

    1974-01-01

    Preliminary assessment of Environmental Impact Statements in California indicate that their effectiveness is directly related to the local political structure. Environmental planning is expected to improve as environmental impact reports gain more credence as an information base for city planners. The need for uniform impact guidelines are…

  10. 49 CFR 266.19 - Environmental impact.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Environmental impact. 266.19 Section 266.19... TRANSPORTATION ACT § 266.19 Environmental impact. (a) General. The Administrator has determined that providing..., or other significant adverse environmental impact on any mode of transportation; (6) The action is...

  11. 24 CFR 58.53 - Use of prior environmental impact statements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Use of prior environmental impact... RESPONSIBILITIES Environmental Review Process: Environmental Impact Statement Determinations § 58.53 Use of prior environmental impact statements. Where any final EIS has been listed in the Federal Register for a...

  12. 24 CFR 58.53 - Use of prior environmental impact statements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Use of prior environmental impact... RESPONSIBILITIES Environmental Review Process: Environmental Impact Statement Determinations § 58.53 Use of prior environmental impact statements. Where any final EIS has been listed in the Federal Register for a...

  13. 24 CFR 58.53 - Use of prior environmental impact statements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 1 2013-04-01 2013-04-01 false Use of prior environmental impact... RESPONSIBILITIES Environmental Review Process: Environmental Impact Statement Determinations § 58.53 Use of prior environmental impact statements. Where any final EIS has been listed in the Federal Register for a...

  14. 10 CFR 51.104 - NRC proceeding using public hearings; consideration of environmental impact statement.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... environmental impact statement. 51.104 Section 51.104 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED....104 NRC proceeding using public hearings; consideration of environmental impact statement. (a)(1) In... subpart until the final environmental impact statement is filed with the Environmental Protection Agency...

  15. 10 CFR 51.104 - NRC proceeding using public hearings; consideration of environmental impact statement.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... environmental impact statement. 51.104 Section 51.104 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED....104 NRC proceeding using public hearings; consideration of environmental impact statement. (a)(1) In... subpart until the final environmental impact statement is filed with the Environmental Protection Agency...

  16. 10 CFR 51.104 - NRC proceeding using public hearings; consideration of environmental impact statement.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... environmental impact statement. 51.104 Section 51.104 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED....104 NRC proceeding using public hearings; consideration of environmental impact statement. (a)(1) In... subpart until the final environmental impact statement is filed with the Environmental Protection Agency...

  17. Environmental Assessment and Final Finding of No Significant Impact for Lantirn Village & Camera I Site Upgrades Fort Wainwright Yukon Training Area Fort Wainwright, Alaska

    DTIC Science & Technology

    2009-08-01

    Carried Forward for 8 Analysis 2.5 Alternatives Impacts Matrix 9 3.0 Affected Environment 1! 3.! Physical Resources 11 3.1.1 General Site Location...18 3.2.4 Wetlands 18 3.2.5 Threatened or Endangered Species 19 3.3 Cultura l and Historic Resources 19 3.4 Recreational Resources and Subsistence...7.0 Bibliography List of Figures and Tables Figure I-J - Regional Map Figure 1-2 - General Site Location Figure 1-3 - Project Location Photo 2- 1

  18. Final Environmental Assessment for Minuteman III Modification

    DTIC Science & Technology

    2004-12-30

    the ocean floor. FONSI-3 At USAKA, target sites for test RVs are located in the deep ocean area east of the Kwajalein reef or in the vicinity...an RV impacts directly on Illeginni Island or in the shallow coral reefs of Kwajalein Atoll, a crater will form. Post-test debris recovery and... coral reef habitat. The USAF has projected that approximately four to five RVs will impact at Illeginni over the next 20 years. The overall effects

  19. 75 FR 29336 - Penobscot River Restoration Trust; Notice of Availability of Final Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-25

    ... of Energy Projects has prepared an Final Environmental Assessment (FEA) for an application filed by... River Basin Comprehensive Settlement Agreement. The FEA evaluates the environmental impacts that would result from approving the licensee's proposed surrenders. The FEA finds that approval of the application...

  20. Environmental Education - A Problem Approach. Final Report.

    ERIC Educational Resources Information Center

    Presnell, Richard W.

    The envrionmental education project, "A Problem Approach," was designed to involve University faculty and community leaders in a number of goals. They attempted to produce a series of audio-taped slide presentations designed to develop a working level of environmental literacy in the project participants and in those people who…

  1. Final report, International Symposium on Environmental Biotechnology

    SciTech Connect

    Wise, Donald L.

    2000-03-20

    This meeting included technical presentations of state-of-the-art research which were integrated with tutorials and workshops by practicing technologies in the broad field of environmental biotechnology. This meeting was designed to be, in every respect, truly global. Over 150 excellent abstracts from around the world were accepted. For example, presentations were heard from technical workers in Southeast Asia, Russia, China, Europe, North Africa, India, and the US. By having these selected presenters, as well as identified experienced tutors with focused workshops, all participants benefited from this interactive symposium. A number of social events further promoted informal exchange of ideas, discussions of technical problems, and exploration of new applications. This international symposium on environmental biotechnology was on the campus of Northeastern University but all Boston area universities were included and participated using designed conference Co-Chairs. This symposium, with an attendance of several hundred people, was considered a major success. Workers with experience in one area of environmental biotechnology learned from the wealth of established backgrounds of those in other areas of environmental biotechnology. To formally disseminate conference results, it was pre-arranged that all technical presentations were reviewed for formal publications.

  2. Pollution. Environmental Education Instructional Unit. Final Edition.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Public Instruction, Raleigh. Div. of Science Education.

    This unit on pollution is one in a series of three prepared for use in the classroom. An interdisciplinary approach encompassing mathematics, science, and social studies is utilized in these environmental units. The material is designed for middle grades and above. Many activities are open-ended with each activity in this unit emphasizing the…

  3. 10 CFR 1021.314 - Supplemental environmental impact statements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Supplemental environmental impact statements. 1021.314 Section 1021.314 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NATIONAL ENVIRONMENTAL POLICY ACT...)(1). (b) DOE may supplement a draft EIS or final EIS at any time, to further the purposes of NEPA,...

  4. Urban Environmental Education--Demonstration. Final Report.

    ERIC Educational Resources Information Center

    Glasser, Roselyn; And Others

    This publication is composed of four parts. Part I, The Final Report, consists of the program foundations, description of the target group, description of resources, analysis of processes developed, creating the resource role, creation awareness, developing a problem solving orientation, curriculum integration, evolution of the group process,…

  5. Total System Performance Assessment - Analyses for Disposal of Commercial and DOE Waste Inventories at Yucca Mountain - Input to Final Environmental Impact Statement and Site Suitability Evaluation, Rev. 00

    SciTech Connect

    NA

    2001-09-17

    This Letter Report presents the results of calculations to assess long-term performance of commercial spent nuclear fuel (CSNF), U.S. Department of Energy (DOE) spent nuclear fuel (DSNF), high-level radioactive waste (HLW), and Greater Than Class C (GTCC) radioactive waste and DOE Special Performance Assessment Required (SPAR) radioactive waste at the potential Yucca Mountain repository in Nye County Nevada with respect to the 10,000-year performance period specified in 40 CFR Part 197.30 (66 FR 32074 [DIRS 155216], p. 32134) with regard to radiation-protection standards. The EPA Final Rule 40 CFR Part 197 has three separate standards, individual-protection, human-intrusion, and groundwater-protection standards, all with a compliance timeframe of 10,000 years. These calculations evaluate the dose to receptors for each of these standards. Further, this Letter Report includes the results of simulations to the 1,000,000-year performance period described in 40 CFR Part 197.35 (66 FR 32074 [DIRS 155216], p. 32135) which calls for the calculation of the peak dose to the Reasonably Maximally Exposed Individual (RMEI) that would occur after 10,000 years and within the period of geological stability. In accordance with TSPA-SR the ''period of geologic stability'' is from zero to 1,000,000 years after repository closure. The calculations also present the 5th and 95th percentiles, and the mean and median of the set of probabilistic simulations used to evaluate various disposal scenarios.

  6. Environmental engineering and analysis: Final report

    SciTech Connect

    Skinner, F.D.

    1989-03-01

    One of the primary missions of the Department of Energy's Morgantown Energy Technology Center (METC) is the development of an information and data base on the engineering and environmental aspects of advanced technologies for the conversion of relatively abundant energy sources, such as coal, to clean fuels. Such fuels may be suitable for a number of end uses, including substitute natural gas, fuel gas for use in gas turbines, and others. METC has provided support for the development of a number of synfuels technologies, including the Mountain Fuel Resources (MFR) and Kellogg-Rust/Westinghouse (KRW) gasification technologies, and several raw gas and aqueous waste cleanup technologies. The primary objective of this project was to obtain and evaluate environmental data for advanced synthetic fuel technologies of interest to the Department of Energy as well as associated pollution controls, such as gas cleanup and wastewater treatment technologies.

  7. Range Roads: Final Programmatic Environmental Assessment

    DTIC Science & Technology

    2002-12-01

    Environmental Assessment SA Species Federally Listed Due to Similarity of Appearance to the American Crocodile SC Federal Species of Concern SE State...similarity of G3 = Either Very Rare or Local Through Range appearance to the American crocodile G4 = Apparently Secure Globally...listed as threatened due to their close resemblance to the American crocodile (federally listed as endangered, and does not occur on Eglin). The

  8. Final Natural Resource Actions Environmental Assessment

    DTIC Science & Technology

    2005-06-22

    f/J-1 o) JO L S. REESE, Colonel, USAF 319 ARW/CV, Chairman, Environmental Protection Committee ROD /051260006 (CLR2912.00C) 2 Architect...Safety and Occupational Health Proposed Action By following proper herbicide application procedures and construction techniques, the Proposed Action... construction season. 2.4.1.3 Prairie View Nature Preserve Management Guide The PVNP Management Guide (Grand Forks AFB, undated) was developed to ensure

  9. Environmental impact estimation of mold making process

    NASA Astrophysics Data System (ADS)

    Kong, Daeyoung

    are manufacturing intensive products and most of their environmental impact is generated by the energy consumption during the machining processes. Milling and EDM operations were selected as the most influential mold and die manufacturing processes. Process variability was found to be the key issue which must be addressed for reliable analysis. Acceleration and deceleration in the milling process and the dielectric contamination and resultant decrease of MRR in the EDM process were identified as main factors for the variability. Energy consumption of these two processes were analyzed and modeled including the variability. Experiments were carried out to validate and improve this model. Finally, this model is implemented as simulation software tools on the basis of CAM software (Esprit CAM(TM)). The CAM-based tool developed in this study can be more easily used in the mold and die manufacturing practice. Considering the variety of mold and die and their application, this tool would be just a small step to a long way to the environmentally benign mold and die manufacturing. However, with further research, the tool developed in this thesis will result in effective way to address environmentally benign mold and die manufacturing.

  10. Environmental training research project. Final report

    SciTech Connect

    1996-04-01

    Santa Fe Community College serves an area including the city and county of Santa Fe. The population has a high percentage of Hispanics and a Native American population of about 3%. The student body at the college generally reflects that of the service district. The college strives to recruit students from all segments of the population so there is representation among all ethnic and economic groups. The college strives to serve students and the community by offering educational opportunities that meet the needs of both elements and which will lead to gainful employment. Instruction is also offered to meets needs for retraining, upgrades, and personal enlightenment. The college started a hazardous materials management program in the fall of 1991 which has since been renamed environmental management. The purpose of this program is to prepare students for environmental careers, to provide required training such as OSHA HAZWOPER and refresher courses, and to provide educational opportunities that would make the public more environmentally aware. The program content needs to be studied to ensure we`re meeting the needs of the students and the business community. There had not been a significant opportunity to conduct this research.

  11. Environmentally conscious manufacturing integrated demonstration. Final report

    SciTech Connect

    Gentry, D.E.

    1993-07-01

    The objective of the Environmentally Conscious Manufacturing Integrated Demonstration was to show that several of the individually developed materials and processes to reduce hazardous materials and waste could be successfully used on a single assembly. A methodology was developed that could be used on any product to plan the approach to eliminating hazardous materials. Sample units of an existing design electronic unit were fabricated applying this methodology and substituting nonhazardous materials and processes. The results of this project show that total waste can be drastically reduced by at least an order of magnitude and hazardous material and waste can be essentially eliminated in the manufacture of this type of electronic devices.

  12. Final Environmental Planning Technical Report. Utilities

    DTIC Science & Technology

    1984-01-01

    Mains and Model Nodes in the North Ranchettes 2-22 and Yellowstone Neighborhoods Nos. 26 and 34 2.6.2-1 SWMM Model Networks for Cheyenne Sanitary Sewers 2...30 2.6.2-2 SWMM Model for South Cheyenne Sanitary Sewers 2-31 2.6.4-1 Schematics of Downtown and East Cheyenne Storm Drains 2-52 Modeled by Computer...sewer networks could not be represented. The Storm Water Management Model ( SWMM ) of the U.S. Environmental Protection Agency (EPA) was applied to the

  13. Final Environmental Planning Technical Report. Transportation

    DTIC Science & Technology

    1984-01-01

    range plans call for the construction of a perma- nent facility. 3-89 o Frontier Services, a related corporate entity of Frontier Airlines, operates an...discontinuation of jet service by Frontier Airlines. A 1-percent growth in jet traffic is assumed thereafter based on corporate and charter operations...Proposed Action 3.5.3.2.1 Cheyenne Airport There are two factors that could result in impacts on the Cheyenne Airport. One is the increased corporate and

  14. 78 FR 75370 - Draft Supplemental Environmental Assessment and Finding of No Significant Impact for Flood...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-11

    ... Significant Impact for Flood Control Improvements to the Rio Grande Canalization Project in Vado, New Mexico... National Environmental Policy ] Act of 1969; the Council on Environmental Quality Final Regulations (40 CFR... Final Environmental Assessment and Finding of No Significant Impact for Flood Control Improvements...

  15. Final rapid reactivation project environmental assessment

    SciTech Connect

    1999-02-10

    The US Department of Energy (DOE) has prepared an environmental assessment (EA) for the Rapid Reactivation Project at Sandia National Laboratories, New Mexico. The EA analyzes the potential effects of a proposal to increase production of neutron generators from the current capability of 600 units per year up to 2,000 units per year. The project would use existing buildings and infrastructure to the maximum extent possible to meet the additional production needs. The increased production levels would necessitate modifications and additions involving a total area of approximately 26,290 gross square feet at Sandia National Laboratories, New Mexico, Technical Area 1. Additional production equipment would be procured and installed. The no-action alternative would be to continue production activities at the current capability of 600 units per year. The EA analyzes effects on health, safety, and air quality, resulting from construction and operation and associated cumulative effects. A detailed description of the proposed action and its environmental consequences is presented in the EA.

  16. Final Environmental Planning Technical Report. Land Use

    DTIC Science & Technology

    1984-01-01

    Mobile Home Residential Multifamily Residential 267 2 5 Commercial 1,005 7 17 Mixed Use 3 71 0 1 Industrial 807 5 14 Public and Semipublic 3,374 23 14...1,004.6 806.7 3,374.3 1,203.8 2,047.6 11,853.8 26,840.0 Note: a Total for commercial includes 71.3 acres of mixed use in the downtown area. 2-25...densities with a consistent but varied housing mix , with services and facilities serving neigh- borhoods, minimization of traffic impacts through

  17. 78 FR 48672 - Environmental Impacts Statements;

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-09

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal... Environmental Impact Statements Filed 07/29/2013 Through 08/02/2013 Pursuant to 40 CFR 1506.9. Notice Section...

  18. 40 CFR 227.4 - Criteria for evaluating environmental impact.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... impact. 227.4 Section 227.4 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) OCEAN... Impact § 227.4 Criteria for evaluating environmental impact. This subpart B sets specific environmental... of direct environmental impact. ...

  19. Maumee Bay State Park, Ohio. Shoreline Erosion Beach Restoration Study. Final Feasibility Report and Final Environmental Impact Statement. Interim to Western Lake Erie Shore Study. Volume 1. Main Report. Revised.

    DTIC Science & Technology

    1983-12-01

    REPORT NUMBER VT ACCESSION NO. 3. RECIPIENT’S CATALOG NUMBER 4. TITLE (and Subtitle) S . TYPE OF REPORT & PERIOD COVERED Maumee Bay State Park, Ohio Final...EDITION OF I NOV OS IS OBSOLETE SECURITY CLASSIFICATION OF THIS PAGE (When Data Entere* • . . . - o. . . -. .’. % s SECURITY CLASSIFICATION OF THIS PAGE...associated ODNR develop- ment are $5.7 million. With total annual charges of $1.7 million, the . benefit-to-cost ratio is 3.41 to 1.0. S ""ODNR is fully

  20. 10 CFR 51.29 - Scoping-environmental impact statement and supplement to environmental impact statement.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Scoping-environmental impact statement and supplement to environmental impact statement. 51.29 Section 51.29 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED... Environmental Policy Act-Regulations Implementing Section 102(2) Scoping § 51.29 Scoping-environmental impact...

  1. 10 CFR 51.29 - Scoping-environmental impact statement and supplement to environmental impact statement.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Scoping-environmental impact statement and supplement to environmental impact statement. 51.29 Section 51.29 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED... statement and supplement to environmental impact statement. (a) The scoping process for an environmental...

  2. 10 CFR 51.29 - Scoping-environmental impact statement and supplement to environmental impact statement.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Scoping-environmental impact statement and supplement to environmental impact statement. 51.29 Section 51.29 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED... statement and supplement to environmental impact statement. (a) The scoping process for an environmental...

  3. 10 CFR 51.29 - Scoping-environmental impact statement and supplement to environmental impact statement.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Scoping-environmental impact statement and supplement to environmental impact statement. 51.29 Section 51.29 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED... statement and supplement to environmental impact statement. (a) The scoping process for an environmental...

  4. Gulfport Harbor, Mississippi. Final Environmental Impact Statement

    DTIC Science & Technology

    1989-06-01

    turtle (Chelonia mydas), hawksbill (Eretmochelys imbricata), leatnerback (Dermochelys coriacea) and the Atlantic ridley (Lepidochelys kempi). Loggerhead...Sound submersed grass beds are restricted to the northern shores of the barrier islands. These areas are characterized by turtle grass (Thalassia...sea turtles . Many shorebirds and wading birds frequent the islands including herons, egrets, terns, gulls, and black EIS-22 skimmers (Rynchops nigra

  5. Predicting on-site environmental impacts of municipal engineering works

    SciTech Connect

    Gangolells, Marta Casals, Miquel Forcada, Núria Macarulla, Marcel

    2014-01-15

    The research findings fill a gap in the body of knowledge by presenting an effective way to evaluate the significance of on-site environmental impacts of municipal engineering works prior to the construction stage. First, 42 on-site environmental impacts of municipal engineering works were identified by means of a process-oriented approach. Then, 46 indicators and their corresponding significance limits were determined on the basis of a statistical analysis of 25 new-build and remodelling municipal engineering projects. In order to ensure the objectivity of the assessment process, direct and indirect indicators were always based on quantitative data from the municipal engineering project documents. Finally, two case studies were analysed and found to illustrate the practical use of the proposed model. The model highlights the significant environmental impacts of a particular municipal engineering project prior to the construction stage. Consequently, preventive actions can be planned and implemented during on-site activities. The results of the model also allow a comparison of proposed municipal engineering projects and alternatives with respect to the overall on-site environmental impact and the absolute importance of a particular environmental aspect. These findings are useful within the framework of the environmental impact assessment process, as they help to improve the identification and evaluation of on-site environmental aspects of municipal engineering works. The findings may also be of use to construction companies that are willing to implement an environmental management system or simply wish to improve on-site environmental performance in municipal engineering projects. -- Highlights: • We present a model to predict the environmental impacts of municipal engineering works. • It highlights significant on-site environmental impacts prior to the construction stage. • Findings are useful within the environmental impact assessment process. • They also

  6. Ports Primer: 7.1 Environmental Impacts

    EPA Pesticide Factsheets

    Port operations can lead to environmental impacts on air, water and land. Many communities with environmental justice concerns also experience disparities in health outcomes that they attribute to exposure to emissions from port operations.

  7. Ports Primer: 7.0 Environmental Impacts

    EPA Pesticide Factsheets

    Port operations can lead to environmental impacts on air, water and land. Many communities with environmental justice concerns also experience disparities in health outcomes that they attribute to exposure to emissions from port operations.

  8. Energy Impact Illinois - Final Technical Report

    SciTech Connect

    Olson, Daniel; Plagman, Emily; Silberhorn, Joey-Lin

    2014-02-18

    Energy Impact Illinois (EI2) is an alliance of government organizations, nonprofits, and regional utility companies led by the Chicago Metropolitan Agency for Planning (CMAP) that is dedicated to helping communities in the Chicago metropolitan area become more energy efficient. Originally organized as the Chicago Region Retrofit Ramp-Up (CR3), EI2 became part of the nationwide Better Buildings Neighborhood Program (BBNP) in May 2010 after receiving a $25 million award from the U.S. Department of Energy (DOE) authorized through the American Recovery and Reinvestment Act of 2009 (ARRA). The program’s primary goal was to fund initiatives that mitigate barriers to energy efficiency retrofitting activities across residential, multifamily, and commercial building sectors in the seven-county CMAP region and to help to build a sustainable energy efficiency marketplace. The EI2 Final Technical Report provides a detailed review of the strategies, implementation methods, challenges, lessons learned, and final results of the EI2 program during the initial grant period from 2010-2013. During the program period, EI2 successfully increased direct retrofit activity in the region and was able to make a broader impact on the energy efficiency market in the Chicago region. As the period of performance for the initial grant comes to an end, EI2’s legacy raises the bar for the region in terms of helping homeowners and building owners to take action on the continually complex issue of energy efficiency.

  9. 10 CFR 51.104 - NRC proceeding using public hearings; consideration of environmental impact statement.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... environmental impact statement. 51.104 Section 51.104 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED....104 NRC proceeding using public hearings; consideration of environmental impact statement. (a)(1) In... scope of NEPA and this subpart are in issue, the NRC staff may not offer the final environmental impact...

  10. Electromagnetic Radiation: Final Range Environmental Assessment, Revision 1

    DTIC Science & Technology

    2009-12-03

    predation by feral cats and loss of dune habitat from recreational foot traffic and storms. American Alligator (Alligator mississippiensis) The...by ANSI Std Z39-18 FINDING OF NO SIGNIFICANT IMPACT FOR ELECTROMAGNETIC RADIATION RANGE ENVIRONMENTAL ASSESSMENT ON EGLIN AIR FORCE BASE, FLORIDA...regulations as promulgated at 40 Code of Federal Regulations (CFR) Part 1500 (40 CFR 1500-1508) plus: • U.S. Air Force Environmental Impact Analysis

  11. An environmental impact assessment system for agricultural R and D

    SciTech Connect

    Rodrigues, Geraldo Stachetti; Campanhola, Clayton; Kitamura, Paulo Choji

    2003-03-01

    A strategic planning process has been implemented at the Brazilian Agricultural Research Agency (Embrapa) to introduce sustainable agriculture concepts in all steps of Research and Development (R and D). An essential part of the devised mission statement called for the impact assessment of all technology innovation resulting from R and D, under field conditions (ex-post). However, methods for impact assessment of technology innovations at the farmstead level appropriate for the institutional context were lacking. The environmental impact assessment (EIA) system (AMBITEC-AGRO) developed to attend that demand is composed by a set of weighing matrices constructed in an electronic spreadsheet. Impact indicators are evaluated in the field in an interview/survey, and weighed according to their spatial scale and importance toward effecting environmental impacts. The results of these weighing procedures are expressed graphically in the assessment spreadsheets. Finally, the indicator evaluations are composed into an Environmental Impact Index for the agricultural technology innovation.

  12. Evaluating the relative environmental impact of countries.

    PubMed

    Bradshaw, Corey J A; Giam, Xingli; Sodhi, Navjot S

    2010-05-03

    Environmental protection is critical to maintain ecosystem services essential for human well-being. It is important to be able to rank countries by their environmental impact so that poor performers as well as policy 'models' can be identified. We provide novel metrics of country-specific environmental impact ranks - one proportional to total resource availability per country and an absolute (total) measure of impact - that explicitly avoid incorporating confounding human health or economic indicators. Our rankings are based on natural forest loss, habitat conversion, marine captures, fertilizer use, water pollution, carbon emissions and species threat, although many other variables were excluded due to a lack of country-specific data. Of 228 countries considered, 179 (proportional) and 171 (absolute) had sufficient data for correlations. The proportional index ranked Singapore, Korea, Qatar, Kuwait, Japan, Thailand, Bahrain, Malaysia, Philippines and Netherlands as having the highest proportional environmental impact, whereas Brazil, USA, China, Indonesia, Japan, Mexico, India, Russia, Australia and Peru had the highest absolute impact (i.e., total resource use, emissions and species threatened). Proportional and absolute environmental impact ranks were correlated, with mainly Asian countries having both high proportional and absolute impact. Despite weak concordance among the drivers of environmental impact, countries often perform poorly for different reasons. We found no evidence to support the environmental Kuznets curve hypothesis of a non-linear relationship between impact and per capita wealth, although there was a weak reduction in environmental impact as per capita wealth increases. Using structural equation models to account for cross-correlation, we found that increasing wealth was the most important driver of environmental impact. Our results show that the global community not only has to encourage better environmental performance in less

  13. Evaluating the Relative Environmental Impact of Countries

    PubMed Central

    Bradshaw, Corey J. A.; Giam, Xingli; Sodhi, Navjot S.

    2010-01-01

    Environmental protection is critical to maintain ecosystem services essential for human well-being. It is important to be able to rank countries by their environmental impact so that poor performers as well as policy ‘models’ can be identified. We provide novel metrics of country-specific environmental impact ranks – one proportional to total resource availability per country and an absolute (total) measure of impact – that explicitly avoid incorporating confounding human health or economic indicators. Our rankings are based on natural forest loss, habitat conversion, marine captures, fertilizer use, water pollution, carbon emissions and species threat, although many other variables were excluded due to a lack of country-specific data. Of 228 countries considered, 179 (proportional) and 171 (absolute) had sufficient data for correlations. The proportional index ranked Singapore, Korea, Qatar, Kuwait, Japan, Thailand, Bahrain, Malaysia, Philippines and Netherlands as having the highest proportional environmental impact, whereas Brazil, USA, China, Indonesia, Japan, Mexico, India, Russia, Australia and Peru had the highest absolute impact (i.e., total resource use, emissions and species threatened). Proportional and absolute environmental impact ranks were correlated, with mainly Asian countries having both high proportional and absolute impact. Despite weak concordance among the drivers of environmental impact, countries often perform poorly for different reasons. We found no evidence to support the environmental Kuznets curve hypothesis of a non-linear relationship between impact and per capita wealth, although there was a weak reduction in environmental impact as per capita wealth increases. Using structural equation models to account for cross-correlation, we found that increasing wealth was the most important driver of environmental impact. Our results show that the global community not only has to encourage better environmental performance in less

  14. 78 FR 68135 - Environmental Impact Statement: Los Angeles County, California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-13

    ... Federal Highway Administration Environmental Impact Statement: Los Angeles County, California AGENCY... Environmental Impact Statement will be prepared for a proposed highway project in Los Angeles County, California... the assigned National Environmental Policy Act (NEPA) agency will prepare an Environmental Impact...

  15. Alaskan Environmental Impact Statements--A Bibliography.

    ERIC Educational Resources Information Center

    Lewandowski, Joseph J., Comp.

    This bibliography is an attempt at compiling and organizing a comprehensive list of Alaska environmental impact statements. Arrangement is by the main issuing or responsible agency and is then divided into sub-agencies. Several publications which are not official environmental impact statements, but of a similar nature, are also included. The…

  16. Devising an Environmental Impact Assessment Curriculum

    ERIC Educational Resources Information Center

    Catalano, Ralph A.

    1975-01-01

    The need for personnel trained in understanding environmental impact statements has become apparent. In an attempt to fill this need, the University of California developed a program designed to produce a select number of graduates qualified to assess environmental impact statements. (MA)

  17. Incorporating social concerns in environmental impact assessments

    SciTech Connect

    Wolfe, A.K.

    1990-03-01

    Social impact assessments most often focus on the population-driven impacts of projects. Such impacts may be insignificant when compared with social structural impacts of complex, controversial projects. This set of impacts includes social disruption, social group formation, and stigma effects. The National Environmental Policy Act does not explicitly call for assessment of, and assessors often are reluctant to address, these complex issues. This paper discusses why such impacts are critical to assess and gives examples of how they have been incorporated into environmental assessment documents. 6 refs.

  18. 77 FR 20843 - Record of Decision for the Nabesna Off-Road Vehicle Management Plan and Final Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-06

    ... Environmental Impact Statement, Wrangell-St. Elias National Park and Preserve AGENCY: National Park Service... Management Plan and Final Environmental Impact Statement (FEIS), Wrangell-St. Elias National Park and... documents decisions regarding off-road vehicle management in the Nabesna District of Wrangell-St. Elias...

  19. Environmental impact assessment: Process and implementation

    SciTech Connect

    Chen, S.Y.; Tsai, S.Y.

    1989-01-01

    In this paper, the procedures and issues regarding the preparation of an environmental impact assessment in accordance with the National Environmental Policy Act (NEPA) as promulgated by the US Congress in 1969 are discussed. NEPA procedures and requirements are covered in general, while particular attention is given to the preparation of the environmental impact assessment. Also included is a discussion of the social impact assessment. The aim of the social impact assessment is to address the social issues involved in enhancing public understanding of the hazardous risks, thereby mitigating any conflicts that may arise in the NEPA process. 3 refs., 1 fig., 1 tab.

  20. Final Land Configuration for the Rocky Flats Environmental Technology Site

    SciTech Connect

    Stegen, R. L.; Kapinos, J. M.; Wehner, J. P.; Snyder, B.; Davis, R. W.

    2006-07-01

    Closure of the Rocky Flats Environmental Technology Site (RFETS) has been completed. The future land use of the site is designated as a National Wildlife Refuge. A joint effort between Kaiser-Hill, Department of Energy, U.S. Fish and Wildlife Service, Environmental Protection Agency, State of Colorado, and other stakeholders was initiated to provide direction for developing the final land configuration. Through early identification of issues and developing mutually agreeable solutions, the final land configuration of the site was successfully completed. (authors)