Sample records for environmental licensing process

  1. The Brazilian Audit Tribunal's role in improving the federal environmental licensing process

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lima, Luiz Henrique, E-mail: luizhlima@terra.com.b; Magrini, Alessandra, E-mail: ale@ppe.ufrj.b; Centro de Tecnologia - Bloco C Sala 211, Ilha do Fundao, 21949-900 - Rio de Janeiro, Caixa-Postal: 68565, RJ

    This article describes the role played by the Brazilian Audit Tribunal (Tribunal de Contas da Uniao - TCU) in the external auditing of environmental management in Brazil, highlighting the findings of an operational audit conducted in 2007 of the federal environmental licensing process. Initially, it records the constitutional and legal framework of Brazilian environmental licensing, describing the powers and duties granted to federal, state and municipal institutions. In addition, it presents the responsibilities of the TCU in the environmental area, comparing these with those of other Supreme Audit Institutions (SAI) that are members of the International Organization of Supreme Auditmore » Institutions (INTOSAI). It also describes the work carried out in the operational audit of the Brazilian environmental licensing process and its main conclusions and recommendations. Finally, it draws a parallel between the findings and recommendations made in Brazil with those of academic studies and audits conducted in other countries.« less

  2. Limitations and drawbacks of using Preliminary Environmental Reports (PERs) as an input to Environmental Licensing in Sao Paulo State: A case study on natural gas pipeline routing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kirchhoff, Denis; Montano, Marcelo; Ranieri, Victor Eduardo Lima

    2007-05-15

    This article discusses the limitations and implications to environmental management issues posed by the Environmental Licensing approach adopted in Sao Paulo State. In Brazil, Environmental Impact Assessment (EIA) is an essential precondition to the Environmental Licensing of activities and, in fact, it has been the most important and required tool for the licensing of projects. However, in 1994 the State of Sao Paulo implemented a simplified instrument called a 'Preliminary Environmental Report' in order to make the environmental licensing process faster. Since then, the Preliminary Environmental Report (PER) has had the role of indicating whether an EIA needs to bemore » elaborated upon or not. The positives and negatives regarding technical, institutional and legal aspects related to the use of Preliminary Environmental Reports (rather than EIA) are discussed using the case study of a high-pressure natural gas pipeline between the cities of Sao Carlos and Porto Ferreira in the State of Sao Paulo. The main conclusion is that the Environmental Licensing process in Sao Paulo should not use PERs as the sole input to decision making about proposed activities, since the PER approach does not guarantee that the proposed activity is environmentally suitable, does not address locational issues or comparison of alternatives, and risk assessment issues are not considered in the earliest stages of assessment.« less

  3. Improving the effectiveness of impact assessment pertaining to Indigenous peoples in the Brazilian environmental licensing procedure

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hanna, Philippe; Vanclay, Frank, E-mail: frank.vanclay@rug.nl; Langdon, Esther Jean

    The number of environmental licence applications for projects affecting Indigenous peoples in Brazil has increased since the implementation of a major infrastructure program (Programa de Aceleração do Crescimento) in 2007. This increase has caused problems for Brazilian agencies involved in environmental licensing procedures (IBAMA, FUNAI and others). We analyze the Brazilian environmental licensing procedure for situations involving Indigenous peoples, Maroons (Quilombolas) or other traditional communities in order to identify potential improvements for Brazil and potentially other countries. Although Brazilian procedures are consistent with international best practice in environmental licensing, in practice social impacts are inadequately addressed, mitigation measures are poorlymore » implemented, and there is a lack of enforcement and compliance. The paper is based on document analysis and interviews with key actors in governmental and non-governmental organizations and Indigenous leaders. We suggest that Free, Prior and Informed Consent (FPIC) processes need to be conducted at the earliest stages of project planning, and that Indigenous peoples should actively participate in impact assessment, monitoring and evaluation processes. In order to achieve a social licence to operate, there needs to be full recognition of traditional knowledge and acceptance of Indigenous values and concepts. We also recommend increased involvement of social experts and mediators as well as improved accountability, enforcement and grievance mechanisms in the licensing process. - Highlights: • The Brazilian environmental licensing system needs to address social impacts better. • Communities need to be consulted at the earliest stage possible. • Indigenous peoples need to be invited to participate in impact assessment teams. • Independent Indigenous committees to monitor implementation of mitigation measures. • Accountability, enforcement and grievance mechanisms need to be improved.« less

  4. [Environmental licensing of major undertakings: possible connection between health and environment].

    PubMed

    Silveira, Missifany; Araújo Neto, Mário Diniz de

    2014-09-01

    The prospect of multidisciplinary assessment that considers the environmental impacts on the health of the population during the implementation of potentially polluting projects is incipient in Brazil. Considering the scenario of major undertakings in the country, broadening the outlook on the health and environment relationship based on social and economic development processes striving for environmentally sustainable projects is a key strategy. This article examines the debate on the relationship between the current development model, the risks, the environment and health and discusses the importance of the participation of the health sector in the environmental licensing procedures, which is the instrument of the Environmental Impact Assessment (EIA). Seeking to create more environmentally and socially sustainable territories, the health sector has been looking for opportunities to participate in the licensing processes of major undertakings from the EIA standpoint. Results of research conducted by the Ministry of Health have demonstrated the form of participation in these processes, highlighting the strengths and weaknesses that favor or hinder the increase of preventive actions in public health in the implementation of major undertakings in Brazil.

  5. 10 CFR 51.80 - Draft environmental impact statement-materials license.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Draft environmental impact statement-materials license. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Materials Licenses § 51.80 Draft environmental impact statement—materials license. (a) The NRC staff will either prepare a draft environmental...

  6. 10 CFR 51.80 - Draft environmental impact statement-materials license.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Draft environmental impact statement-materials license. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Materials Licenses § 51.80 Draft environmental impact statement—materials license. (a) The NRC staff will either prepare a draft environmental...

  7. 10 CFR 51.80 - Draft environmental impact statement-materials license.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Draft environmental impact statement-materials license. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Materials Licenses § 51.80 Draft environmental impact statement—materials license. (a) The NRC staff will either prepare a draft environmental...

  8. 10 CFR 51.80 - Draft environmental impact statement-materials license.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Draft environmental impact statement-materials license. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Materials Licenses § 51.80 Draft environmental impact statement—materials license. (a) The NRC staff will either prepare a draft environmental...

  9. 10 CFR 51.80 - Draft environmental impact statement-materials license.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Draft environmental impact statement-materials license. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Materials Licenses § 51.80 Draft environmental impact statement—materials license. (a) The NRC staff will either prepare a draft environmental...

  10. 77 FR 11171 - License Renewal Application for Callaway Plant, Unit 1, Union Electric Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-24

    ... Callaway Plant, Unit 1, Union Electric Company AGENCY: Nuclear Regulatory Commission. ACTION: Intent to prepare environmental impact statement and conduct scoping process. SUMMARY: Union Electric Company, a..., MO. The current operating license for Callaway expires on October 18, 2024. DATES: The public scoping...

  11. 10 CFR 51.26 - Requirement to publish notice of intent and conduct scoping process.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Requirement to publish notice of intent and conduct scoping process. 51.26 Section 51.26 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy...

  12. K-BREF(Korean BAT reference document) development : BAT and BAT-AELs for large combustion plants and waste incinerators in Korea.

    NASA Astrophysics Data System (ADS)

    Yoo, Heungmin; Lee, Daegyun; Park, Jaehong

    2017-04-01

    Since the initial environmental policy namely "Regulation on assigning license for environmental pollutant emission facilities" was introduced in 1971, the previous environmental policy that assign licenses on emission facilities of each pollutant has been implementing in Korea. From this, economic standard and environmental quality of Korea are recognized as level of developed countries, even though various development activities for industrialization. However, amount of pollutant, emission route and emission source are increasing with development of various industries, and citizens recognition for environment have been changed as well. Thus, ministry of environment of Korea needs systematic policy based on scientific grounds for conversion of paradigm. For this, ministry of environment was introduced new policy namely "integrated pollution prevention and control(IPPC)", and it will be implemented from 2017 in Korea. IPPC is established for considering environment, economic and efficiency: 10 licenses on each pollutant emission will be integrated to one license, and it can be expected simplification for business licensing process. As well, this policy can be upgraded and processed while considering characteristics on location and industry types, in the future. However, to conduct this system harmoniously, policy demanders have to apply integrated control system to their facilities. Especially, the first applied industries by IPPC are two industries, such as large combustion plants for power generation and waste incineration facilities. Therefore, ministry of environment has to publish technical guideline books firstly for those industries, and they were named to "BAT reference document(BREF)". In this study, essential information for BREFs publishment, that is including emission levels, best available technique(BAT) and so on was investigated. In addition, the BAT-associated emission levels (BAT-AELs) of each industry were set using emission data obtained from realtime-monitoring system.

  13. WCSC environmental process improvement study and demonstration program

    NASA Technical Reports Server (NTRS)

    Pawlick, Joseph F., Jr.; Severo, Orlando C.

    1993-01-01

    CSTAR's objective to develop commercial infrastructure is multi-faceted and includes diverse elements of the orbital and suborbital missions. Goals to this eight-month project with the WCSC are aimed at simplifying the environmental assessment, approval, and licensing process for commercial users. Included in this overarching set of goals are two specific processes: (1) air pollution control, and (2) the environmental assessment mechanism. Resolution of the potentially user unfriendly aspects of these environmentally sensitive criteria are readily transferable to other ranges where commercial space activity will be supported.

  14. 10 CFR 51.88 - Proposals for legislation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act-Regulations Implementing Section 102(2... Commission will, as a matter of policy, follow the provisions of 40 CFR 1506.8 regarding the NEPA process for...

  15. 78 FR 46255 - Revisions to Environmental Review for Renewal of Nuclear Power Plant Operating Licenses; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-31

    ... environmental effect of renewing the operating license of a nuclear power plant. This document is necessary to..., Environmental impact statement, Nuclear materials, Nuclear power plants and reactors, Reporting and... Environmental Review for Renewal of Nuclear Power Plant Operating Licenses; Correction AGENCY: Nuclear...

  16. 78 FR 37324 - Preparation of Environmental Reports for Nuclear Power Plant License Renewal Applications

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-20

    ... Commission's 1996 findings on the environmental impacts of renewing the operating license of a nuclear power.... Specifically, the final rule amends Table B-1 by redefining the number and scope of the environmental impact... is publishing Revision 1 to NUREG-1437, ``Generic Environmental Impact Statement for License Renewal...

  17. SITE TECHNOLOGY CAPSULE; MULTI-VENDOR BIOREMEDIATION DEMONSTRATION PROJECT: ENVIRONMENTAL LABORATORIES/SBP TECHNOLOGIES' UVB VACUUM VAPORIZATION WELL PROCESS

    EPA Science Inventory

    This technology capsule summarizes the findings of an evaluation of the Unterdruck-Verdampfer-Brunnen (UVB) technology developed by IEG Technologies (IEG) and licensed in the eastern United States by Environmental Laboratories, Inc. (ELI) and SBP Technologies, Inc. (SBP). This e...

  18. 10 CFR 51.54 - Environmental report-manufacturing license.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... evaluation of alternative energy sources. (b) Each applicant for an amendment to a manufacturing license... 10 Energy 2 2012-01-01 2012-01-01 false Environmental report-manufacturing license. 51.54 Section 51.54 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR...

  19. 10 CFR 51.54 - Environmental report-manufacturing license.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... evaluation of alternative energy sources. (b) Each applicant for an amendment to a manufacturing license... 10 Energy 2 2011-01-01 2011-01-01 false Environmental report-manufacturing license. 51.54 Section 51.54 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR...

  20. 10 CFR 51.54 - Environmental report-manufacturing license.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... evaluation of alternative energy sources. (b) Each applicant for an amendment to a manufacturing license... 10 Energy 2 2014-01-01 2014-01-01 false Environmental report-manufacturing license. 51.54 Section 51.54 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR...

  1. 10 CFR 51.54 - Environmental report-manufacturing license.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... evaluation of alternative energy sources. (b) Each applicant for an amendment to a manufacturing license... 10 Energy 2 2010-01-01 2010-01-01 false Environmental report-manufacturing license. 51.54 Section 51.54 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR...

  2. 10 CFR 51.54 - Environmental report-manufacturing license.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... evaluation of alternative energy sources. (b) Each applicant for an amendment to a manufacturing license... 10 Energy 2 2013-01-01 2013-01-01 false Environmental report-manufacturing license. 51.54 Section 51.54 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR...

  3. 77 FR 53198 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-31

    ..., Fluoride Extraction Process and Depleted Uranium Deconversion Plant, License Application to Construct... River National Forest Oil and Gas Leasing, Eagle, Garfield, Gunnison, Mesa, Moffat, Pitkin, Rio Blanco...

  4. The contractor`s role in low-level waste disposal facility application review and licensing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Serie, P.J.; Dressen, A.L.

    1991-12-31

    The California Department of Health Services will soon reach a licensing decision on the proposed Ward Valley low-level radioactive waste disposal facility. As the first regulatory agency in the country to address the 10 CFR Part 61 requirements for a new disposal facility, California`s program has broken new ground in its approach. Throughout the review process, the Department has relied on contractor support to augment its technical and administrative staff. A team consisting of Roy F. Weston, Inc., supported by ERM-Program Management Corp., Environmental Issues Management, Inc., and Rogers and Associates Engineering Corporation, has worked closely with the Department inmore » a staff extension role. The authors have been involved with the project in contractor project management roles since 1987, and continue to support the Department`s program as it proceeds to finalize its licensing process. This paper describes the selection process used to identify a contractor team with the needed skills and experience, and the makeup of team capabilities. It outlines the management, communication, and technical approaches used to assure a smooth agency-contractor function and relationship. It describes the techniques used to ensure that decisions and documents represented the Department credibly in its role as the regulatory and licensing agency under the Nuclear Regulatory Commission (NRC) Agreement State program. The paper outlines the license application review process and activities, through preparation of licensing documentation and responses to public comments. Lessons learned in coordination of an agency-contractor team effort to review and license a low-level waste disposal facility are reviewed and suggestions made for approaching a similar license application review and licensing situation.« less

  5. 10 CFR 51.21 - Criteria for and identification of licensing and regulatory actions requiring environmental...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Criteria for and identification of licensing and regulatory actions requiring environmental assessments. 51.21 Section 51.21 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY...

  6. 10 CFR 51.21 - Criteria for and identification of licensing and regulatory actions requiring environmental...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Criteria for and identification of licensing and regulatory actions requiring environmental assessments. 51.21 Section 51.21 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY...

  7. 14 CFR 415.203 - Environmental information.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Environmental information. 415.203 Section..., DEPARTMENT OF TRANSPORTATION LICENSING LAUNCH LICENSE Environmental Review § 415.203 Environmental information. An applicant shall submit environmental information concerning: (a) A proposed launch site not...

  8. 10 CFR 51.62 - Environmental report-land disposal of radioactive waste licensed under 10 CFR part 61.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Environmental report-land disposal of radioactive waste....62 Environmental report—land disposal of radioactive waste licensed under 10 CFR part 61. (a) Each applicant for issuance of a license for land disposal of radioactive waste pursuant to part 61 of this...

  9. 10 CFR 51.62 - Environmental report-land disposal of radioactive waste licensed under 10 CFR part 61.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Environmental report-land disposal of radioactive waste....62 Environmental report—land disposal of radioactive waste licensed under 10 CFR part 61. (a) Each applicant for issuance of a license for land disposal of radioactive waste pursuant to part 61 of this...

  10. 10 CFR 51.62 - Environmental report-land disposal of radioactive waste licensed under 10 CFR part 61.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Environmental report-land disposal of radioactive waste....62 Environmental report—land disposal of radioactive waste licensed under 10 CFR part 61. (a) Each applicant for issuance of a license for land disposal of radioactive waste pursuant to part 61 of this...

  11. 10 CFR 51.62 - Environmental report-land disposal of radioactive waste licensed under 10 CFR part 61.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Environmental report-land disposal of radioactive waste....62 Environmental report—land disposal of radioactive waste licensed under 10 CFR part 61. (a) Each applicant for issuance of a license for land disposal of radioactive waste pursuant to part 61 of this...

  12. 10 CFR 51.62 - Environmental report-land disposal of radioactive waste licensed under 10 CFR part 61.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Environmental report-land disposal of radioactive waste....62 Environmental report—land disposal of radioactive waste licensed under 10 CFR part 61. (a) Each applicant for issuance of a license for land disposal of radioactive waste pursuant to part 61 of this...

  13. 15 CFR 970.506 - Environmental effects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Environmental effects. 970.506 Section... ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Issuance/Transfer/Terms... Environmental effects. Before issuing or transferring an exploration license, the Administrator must find that...

  14. 15 CFR 970.506 - Environmental effects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Environmental effects. 970.506 Section... ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Issuance/Transfer/Terms... Environmental effects. Before issuing or transferring an exploration license, the Administrator must find that...

  15. 18 CFR 5.22 - Notice of acceptance and ready for environmental analysis.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Notice of acceptance and ready for environmental analysis. 5.22 Section 5.22 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT INTEGRATED LICENSE APPLICATION PROCESS § 5.22 Notice o...

  16. 14 CFR 433.9 - Environmental information.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Environmental information. 433.9 Section..., DEPARTMENT OF TRANSPORTATION LICENSING LICENSE TO OPERATE A REENTRY SITE § 433.9 Environmental information. An applicant shall submit environmental information concerning a proposed reentry site not covered by...

  17. 18 CFR 5.25 - Applications requiring a draft NEPA document.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... a draft NEPA document. 5.25 Section 5.25 Conservation of Power and Water Resources FEDERAL ENERGY... APPLICATION PROCESS § 5.25 Applications requiring a draft NEPA document. (a) If the Commission determines that a license application will be processed with an environmental impact statement, or a draft and final...

  18. 18 CFR 5.25 - Applications requiring a draft NEPA document.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... a draft NEPA document. 5.25 Section 5.25 Conservation of Power and Water Resources FEDERAL ENERGY... APPLICATION PROCESS § 5.25 Applications requiring a draft NEPA document. (a) If the Commission determines that a license application will be processed with an environmental impact statement, or a draft and final...

  19. 18 CFR 5.25 - Applications requiring a draft NEPA document.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... a draft NEPA document. 5.25 Section 5.25 Conservation of Power and Water Resources FEDERAL ENERGY... APPLICATION PROCESS § 5.25 Applications requiring a draft NEPA document. (a) If the Commission determines that a license application will be processed with an environmental impact statement, or a draft and final...

  20. Assessing the "need to negotiate" in FERC licensing consultations: a study of two hydropower projects

    USGS Publications Warehouse

    Coughlan, Beth A. K.; Burkardt, Nina; Fulton, David

    1993-01-01

    We investigated the “need to negotiate” in a comparative case study of multi-agency negotiations in the FERC licensing process. Researchers interviewed participants in two cases involving environmental consultations and asked about parties' level of need to negotiate throughout the process. Participants identified a need to negotiate, and when this need was strongly felt, there was an increased opportunity for an agreement to be reached. An intense need to negotiate by all parties is not a prerequisite to successful agreements. When key participants have a strong need to negotiate, they can instigate negotiations and encourage the involvement of other parties.

  1. Workshop on environmental qualification of electric equipment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lofaro, R.; Gunther, W.; Villaran, M.

    1994-05-01

    Questions concerning the Environmental Qualification (EQ) of electrical equipment used in commercial nuclear power plants have recently become the subject of significant interest to the US Nuclear Regulatory Commission (NRC). Initial questions centered on whether compliance with the EQ requirements for older plants were adequate to support plant operation beyond 40 years. After subsequent investigation, the NRC Staff concluded that questions related to the differences in EQ requirements between older and newer plants constitute a potential generic issue which should be evaluated for backfit, independent of license renewal activities. EQ testing of electric cables was performed by Sandia National Laboratoriesmore » (SNL) under contract to the NRC in support of license renewal activities. Results showed that some of the environmentally qualified cables either failed or exhibited marginal insulation resistance after a simulated plant life of 20 years during accident simulation. This indicated that the EQ process for some electric cables may be non-conservative. These results raised questions regarding the EQ process including the bases for conclusions about the qualified life of components based upon artificial aging prior to testing.« less

  2. 14 CFR 433.7 - Environmental.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Environmental. 433.7 Section 433.7... TRANSPORTATION LICENSING LICENSE TO OPERATE A REENTRY SITE § 433.7 Environmental. An applicant shall provide the FAA with information for the FAA to analyze the environmental impacts associated with proposed...

  3. 14 CFR 433.7 - Environmental.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false Environmental. 433.7 Section 433.7... TRANSPORTATION LICENSING LICENSE TO OPERATE A REENTRY SITE § 433.7 Environmental. An applicant shall provide the FAA with information for the FAA to analyze the environmental impacts associated with proposed...

  4. 78 FR 37325 - License Renewal of Nuclear Power Plants; Generic Environmental Impact Statement and Standard...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-20

    ... Nuclear Power Plants; Generic Environmental Impact Statement and Standard Review Plans for Environmental... for Nuclear Power Plants, Supplement 1: Operating License Renewal'' (ESRP). The ESRP serves as a guide... published a final rule, ``Revisions to Environmental Review for Renewal of Nuclear Power Plant Operating...

  5. 10 CFR 51.20 - Criteria for and identification of licensing and regulatory actions requiring environmental...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Criteria for and identification of licensing and regulatory actions requiring environmental impact statements. 51.20 Section 51.20 Energy NUCLEAR REGULATORY... radioactive waste in a monitored retrievable storage installation (MRS). (10) Issuance of a license for a...

  6. Use of the Legal-Institutional Analysis Model to assess hydropower licensing negotiations

    USGS Publications Warehouse

    Burkardt, N.; Lamb, B.L.; Lamb, B.L.; Garcia de Jalon, D.; Sabaton, C.; Souchon, Y.; Tamai, N.; Robinette, H.R.; Waddle, T.J.; Brinson, A.

    2003-01-01

    In the United States, the Federal Energy Regulatory Commission (FERC) is responsible for issuing or renewing licenses for hydropower projects owned and operated by power companies. During the licensing process, these companies are required to consult with agencies and other parties that are affected by project operating regimes. Typical participants include state and federal fish and wildlife agencies, environmental interest groups, and the FERC. One of the most difficult tasks facing participants is to reach agreement about what kinds of environmental conditions should be placed on license. Researchers at the United States Geological Survey developed a model to analyze the institutional context of natural resource disputes. The Legal-Institutional Analysis Model (LIAM) is a computerized model that allows an analyst to determine the likely behavior of each organization in a conflict. The model also analyzes the types and levels of negotiating power held by each organization. Researchers at the USGS have used the model in several cases involving hydropower license applications. To use the model, they facilitate workshops for stakeholder groups in order to develop a shared understanding of the likely obstacles and opportunities for successful resolution of the issues. This allows a systematic workshop analyses to develop strategies for successful negotiations, because they are able to better understand the negotiation problem and work more effectively with both their allies and their competitors.

  7. 10 CFR 51.75 - Draft environmental impact statement-construction permit, early site permit, or combined license.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... required. 5 The impact statement shall take account of dose commitments and health effects from fuel cycle... the site proposed. The draft environmental impact statement must not include an assessment of the... certification environmental assessment, then the draft combined license environmental impact statement shall...

  8. 10 CFR 51.75 - Draft environmental impact statement-construction permit, early site permit, or combined license.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... required. 5 The impact statement shall take account of dose commitments and health effects from fuel cycle... the site proposed. The draft environmental impact statement must not include an assessment of the... certification environmental assessment, then the draft combined license environmental impact statement shall...

  9. 10 CFR 51.75 - Draft environmental impact statement-construction permit, early site permit, or combined license.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... required. 5 The impact statement shall take account of dose commitments and health effects from fuel cycle... the site proposed. The draft environmental impact statement must not include an assessment of the... certification environmental assessment, then the draft combined license environmental impact statement shall...

  10. 76 FR 56951 - Licenses, Certifications, and Approvals for Materials Licensees

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-15

    ... applicants to take action that would have significant environmental impacts with no NRC oversight or... materials license facility to be prepared and significant environmental impacts to occur without undergoing... permit only limited construction activities and the environmental impacts associated with activities...

  11. 15 CFR 970.2502 - Post voyage report.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Pre-license Exploration § 970... citizen engaging in the voyage shall submit to NOAA a report containing any environmental data or...

  12. 15 CFR 970.2502 - Post voyage report.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Pre-license Exploration § 970... citizen engaging in the voyage shall submit to NOAA a report containing any environmental data or...

  13. 15 CFR 970.2502 - Post voyage report.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Pre-license Exploration § 970... citizen engaging in the voyage shall submit to NOAA a report containing any environmental data or...

  14. 10 CFR 51.97 - Final environmental impact statement-materials license.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Final environmental impact statement-materials license. 51.97 Section 51.97 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION... enrichment facility. As provided in section 5(e) of the Solar, Wind, Waste, and Geothermal Power Production...

  15. 10 CFR 51.97 - Final environmental impact statement-materials license.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Final environmental impact statement-materials license. 51.97 Section 51.97 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION... enrichment facility. As provided in section 5(e) of the Solar, Wind, Waste, and Geothermal Power Production...

  16. 10 CFR 51.97 - Final environmental impact statement-materials license.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Final environmental impact statement-materials license. 51.97 Section 51.97 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION... enrichment facility. As provided in section 5(e) of the Solar, Wind, Waste, and Geothermal Power Production...

  17. 43 CFR 3910.32 - Environmental analysis.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Environmental analysis. 3910.32 Section 3910.32 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND... Licenses § 3910.32 Environmental analysis. (a) Before the BLM will issue an exploration license, the BLM...

  18. 10 CFR 51.97 - Final environmental impact statement-materials license.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Final environmental impact statement-materials license. 51.97 Section 51.97 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION... enrichment facility. As provided in section 5(e) of the Solar, Wind, Waste, and Geothermal Power Production...

  19. 10 CFR 51.97 - Final environmental impact statement-materials license.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Final environmental impact statement-materials license. 51.97 Section 51.97 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION... enrichment facility. As provided in section 5(e) of the Solar, Wind, Waste, and Geothermal Power Production...

  20. 18 CFR 5.16 - Preliminary licensing proposal.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... proposal; and (3) Include the potential applicant's draft environmental analysis by resource area of the... draft license application which includes the contents of a license application required by § 5.18 instead of the Preliminary Licensing Proposal. A potential applicant that elects to file a draft license...

  1. Emerging adults without a driver's license engage in more transportation-related physical activity to school/work in certain environmental contexts.

    PubMed

    Kar, Indra Neal; Li, Kaigang; Haynie, Denise L; Simons-Morton, Bruce G

    2017-03-01

    The aim was to examine the moderation effect of driving licensure status on the association between different environmental contexts and transportation-related physical activity to and from school and/or work (TPA-SW) among emerging adults. The data were from Wave 4 (n=2026, year 2013) of the NEXT Generation Health Study, an annual assessment of a nationally representative cohort across the nine U.S. Census Divisions. The outcome variable, TPA-SW, was derived from walking or cycling as modes of travel to and from school and/or work. Environmental context variables included residence, college attendance, and work status. Driving licensure status indicated whether or not participants had an independent driver's license. Poisson regression models, adjusted for potential confounders, were used to test interactions between environmental context and driving licensure. There were significant interactions between environmental context and licensure. Interaction contrasts indicated that participants who did not have a driver's license engaged in more TPA-SW than their licensed counterparts if they were living at home (β=1.10, p<0.001), not attending school (β=0.73, p<0.001), attending a technical school/community college (β=1.13, p<0.001), working 1-30 hours/week (β=0.69, p<0.001), or working 30+hours/week (β=1.12, p<0.001). Among non-workers, those without a license engaged in less TPA-SW than participants with a license (β=-0.22, p=0.05). Among emerging adults in certain environmental contexts, delayed driver licensing may result in more physical activity with the possible tradeoff of less transportation mobility. Published by Elsevier Inc.

  2. Emerging Adults without a Driver’s License Engage in More Transportation-Related Physical Activity to School/Work in Certain Environmental Contexts

    PubMed Central

    Kar, Indra Neal; Li, Kaigang; Haynie, Denise L.; Simons-Morton, Bruce G.

    2017-01-01

    The aim was to examine the moderation effect of driving licensure status on the association between different environmental contexts and transportation-related physical activity to and from school and/or work (TPA-SW) among emerging adults. The data were from Wave 4 (n = 2,026, year 2013) of the NEXT Generation Health Study, an annual assessment of a nationally representative cohort across the nine U.S. Census Divisions. The outcome variable, TPA-SW, was derived from walking or cycling as modes of travel to and from school and/or work. Environmental context variables included residence, college attendance, and work status. Driving licensure status indicated whether or not participants had an independent driver’s license. Poisson regression models, adjusted for potential confounders, were used to test interactions between environmental context and driving licensure. There were significant interactions between environmental context and licensure. Interaction contrasts indicated that participants who did not have a driver’s license engaged in more TPA-SW than their licensed counterparts if they were living at home (β = 1.10, p < 0.001), not attending school (β = 0.73, p < 0.001), attending a technical school/community college (β = 1.13, p < 0.001), working 1–30 hours/week (β = 0.69, p < 0.001), or working 30+ hours/week (β = 1.12, p < 0.001). Among nonworkers, those without a license engaged in less TPA-SW than participants with a license (β = − 0.22, p = 0.05). Among emerging adults in certain environmental contexts, delayed driver licensing may result in more physical activity with the possible tradeoff of less transportation mobility. PMID:28011136

  3. 10 CFR Appendix B to Subpart A of... - Environmental Effect of Renewing the Operating License of a Nuclear Power Plant

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... environmental impacts of renewing the operating license for a nuclear power plant as required by section 102(2... cooling ponds and is not expected to be a problem during the license renewal term. Aquatic Ecology (for... depression beyond the site boundary. Impacts of large ground-water withdrawal for cooling tower makeup at...

  4. 43 CFR 3141.2-2 - Exploration licenses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... license to conduct core drilling and other exploration activities to collect geologic, environmental and... drilling for oil or gas will be allowed under an exploration license issued under this subpart. No specific...

  5. 43 CFR 3141.2-2 - Exploration licenses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... license to conduct core drilling and other exploration activities to collect geologic, environmental and... drilling for oil or gas will be allowed under an exploration license issued under this subpart. No specific...

  6. 43 CFR 3141.2-2 - Exploration licenses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... license to conduct core drilling and other exploration activities to collect geologic, environmental and... drilling for oil or gas will be allowed under an exploration license issued under this subpart. No specific...

  7. 43 CFR 3141.2-2 - Exploration licenses.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... license to conduct core drilling and other exploration activities to collect geologic, environmental and... drilling for oil or gas will be allowed under an exploration license issued under this subpart. No specific...

  8. 15 CFR 960.5 - Confidentiality of information.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... ENVIRONMENTAL DATA SERVICE LICENSING OF PRIVATE REMOTE SENSING SYSTEMS Licenses § 960.5 Confidentiality of... thirty (30) days of the issuance of a license to operate a remote sensing space system, the licensee...

  9. 15 CFR 960.5 - Confidentiality of information.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... ENVIRONMENTAL DATA SERVICE LICENSING OF PRIVATE REMOTE SENSING SYSTEMS Licenses § 960.5 Confidentiality of... thirty (30) days of the issuance of a license to operate a remote sensing space system, the licensee...

  10. 15 CFR 960.5 - Confidentiality of information.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... ENVIRONMENTAL DATA SERVICE LICENSING OF PRIVATE REMOTE SENSING SYSTEMS Licenses § 960.5 Confidentiality of... thirty (30) days of the issuance of a license to operate a remote sensing space system, the licensee...

  11. 15 CFR 960.5 - Confidentiality of information.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... ENVIRONMENTAL DATA SERVICE LICENSING OF PRIVATE REMOTE SENSING SYSTEMS Licenses § 960.5 Confidentiality of... thirty (30) days of the issuance of a license to operate a remote sensing space system, the licensee...

  12. 15 CFR 960.5 - Confidentiality of information.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... ENVIRONMENTAL DATA SERVICE LICENSING OF PRIVATE REMOTE SENSING SYSTEMS Licenses § 960.5 Confidentiality of... thirty (30) days of the issuance of a license to operate a remote sensing space system, the licensee...

  13. 10 CFR 72.34 - Environmental report.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Environmental report. 72.34 Section 72.34 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE License Application, Form...

  14. All-Wales licensed premises intervention (AWLPI): a randomised controlled trial to reduce alcohol-related violence

    PubMed Central

    2014-01-01

    Background Alcohol-related violence in and in the vicinity of licensed premises continues to place a considerable burden on the United Kingdom’s (UK) health services. Robust interventions targeted at licensed premises are therefore required to reduce the costs of alcohol-related harm. Previous evaluations of interventions in licensed premises have a number of methodological limitations and none have been conducted in the UK. The aim of the trial was to determine the effectiveness of the Safety Management in Licensed Environments intervention designed to reduce alcohol-related violence in licensed premises, delivered by Environmental Health Officers, under their statutory authority to intervene in cases of violence in the workplace. Methods/Design A national randomised controlled trial, with licensed premises as the unit of allocation. Premises were identified from all 22 Local Authorities in Wales. Eligible premises were those with identifiable violent incidents on premises, using police recorded violence data. Premises were allocated to intervention or control by optimally balancing by Environmental Health Officer capacity in each Local Authority, number of violent incidents in the 12 months leading up to the start of the project and opening hours. The primary outcome measure is the difference in frequency of violence between intervention and control premises over a 12 month follow-up period, based on a recurrent event model. The trial incorporates an embedded process evaluation to assess intervention implementation, fidelity, reach and reception, and to interpret outcome effects, as well as investigate its economic impact. Discussion The results of the trial will be applicable to all statutory authorities directly involved with managing violence in the night time economy and will provide the first formal test of Health and Safety policy in this environment. If successful, opportunities for replication and generalisation will be considered. Trial registration UKCRN 14077; ISRCTN78924818. PMID:24405575

  15. Hydropower resources at risk: The status of hydropower regulation and development - 1997

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hunt, R.T.; Hunt, J.A.

    This report documents today`s hydropower licensing and development status based on published data as follows: (a) Federal Energy Regulatory Commission (FERC) databases, maintained by FERC`s Office of Hydropower Licensing, of: (1) operating FERC-regulated projects, federal projects, and known unlicensed projects; (2) surrendered licenses; and, (3) recent licensing and relicensing actions; (b) Energy Information Administration (EIA) data on installed capacity and generation from 1949 through 1995 for the various resources used to produce electricity in the U.S.; and, (c) FERC licensing orders, and environmental assessments or environmental impact statements for each individual project relicensed since 1980. The analysis conducted to preparemore » this paper includes the effects of all FERC hydropower licensing actions since 1980, and applies those findings to estimate the costs of hydropower licensing and development activity for the next 15 years. It also quantifies the national cost of hydropower regulation. The future estimates are quite conservative. The are presented in 1996 dollars without speculating on the effects of future inflation, license surrenders, conditions imposed through open-ended license articles, license terms greater than 30 years, or low water years. Instead, they show the most directly predictable influences on licensing outcomes using actual experiences since ECPA (after 1986).« less

  16. Final Environmental Assessment for the Closure of the Garland ANG Station 254th Combat Communications Group Garland, Texas

    DTIC Science & Technology

    2009-07-01

    using GIS, ArcView, ArcGIS , and PGS. Mary Washington College, 2002, BA, Geography. AIR NATIONAL GUARD COORDINATORS Major Stephen R. Lippert...Environmental Impact Assessment Process Regulations at 32 CFR Part 989, and US Air Force Instruction 32-7061 (12 March 2003), the Air National Guard...license between the Texas National Guard and the Federal Government (specifically, the US Air Force, with the US Army Corps of Engineers as its agent

  17. 76 FR 9345 - Soule Hydro, LLC; Notice of Draft License Application and Preliminary Draft Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-17

    ...] Soule Hydro, LLC; Notice of Draft License Application and Preliminary Draft Environmental Assessment (PDEA) and Request for Preliminary Terms and Conditions Take notice that the following hydroelectric... Project: With this notice the Commission is soliciting (1) preliminary terms, conditions, and...

  18. 10 CFR 60.24 - Updating of application and environmental impact statement.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Updating of application and environmental impact statement. 60.24 Section 60.24 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses License Applications § 60.24 Updating of application and...

  19. 75 FR 6067 - Notice of Availability of Environmental Assessment and Finding of No Significant Impact for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-05

    ... Environmental Assessment and Finding of No Significant Impact for License Amendment for Revised Groundwater... groundwater protection standards for its facility near Jeffrey City, Wyoming. On June 19, 1981, WNI announced... submitted a license amendment request for revised groundwater protection standards. On [[Page 6068

  20. 10 CFR 51.20 - Criteria for and identification of licensing and regulatory actions requiring environmental...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... design capacity license to operate an isotopic enrichment plant pursuant to part 50 of this chapter. (4... uranium enrichment facility. (11) Issuance of renewal of a license authorizing receipt and disposal of...

  1. Final Environmental Impact Statement for the construction and operation of Claiborne Enrichment Center, Homer, Louisiana (Docket No. 70-3070)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zeitoun, A.

    1994-08-01

    This two-volume Final Environmental Impact Statement (FEIS) was prepared by the Nuclear Regulatory Commission (NRC) in accordance with regulation 10 CFR Part 51, which implements the National Environmental Policy Act (NEPA). Volume 1 contains the assessment of the potential environmental impacts for licensing the construction and operation of a proposed gaseous centrifuge enrichment facility to be built in Claiborne Parish, Louisiana, by Louisiana Energy Services, LP. (LES). The proposed facility would have a production capacity of about 866 metric tons annually of up to 5 weight percent enriched UF{sub 6}, using a proven centrifuge technology. Included in the assessment aremore » construction, both normal operations and potential accidents (internal and external events), and the eventual decontamination and decommissioning (D&D)- of the site. Issues addressed include the purpose and need for the facility, the alternatives to the proposed action, potential disposition of the tails, the site selection process, and environmental justice. The NRC staff concludes that the facility can be constructed and operated with small and acceptable impacts on the public and the environment. The FEIS supports issuance of a license to the applicant, Louisiana Energy Services, to authorize construction and operation of the proposed facility.« less

  2. Social license to operate: case from brazilian mining industry

    NASA Astrophysics Data System (ADS)

    Santiago, Ana Lúcia F.; Demajorovic, Jacques; Aledo, Antonio

    2015-04-01

    The approach of the Social License to Operate (SLO) emerges as an important element in academic discussions and business practices related to extractive industries. It appears that in productive activities with great potential to produce economic, social and environmental impacts, conventional approaches based on legal compliance no longer sufficient to legitimize the actions of companies and engagement stakeholders. Studies highlight the need of mining activities receiving a SLO "issued" by companies stakeholders, including society, government, non-governmental organizations, media and communities. However, local communities appears as major stakeholders in governance arrangements, by virtue of its proximity to extractive areas and ability to affect the company's results. Stakeholders with unmet expectations can generate conflicts and risks to the company, the knowledge of these expectations and an awareness of company managers of the importance of Social License to Operate (SLO), can generate strategies and mitigating actions to prevent and or minimize possible conflicts. The concept of SLO arises in engineering extractive industry, when you need to respond to social challenges, beyond the usual environmental challenges, technological and management. According to Franks and Cohen (2012) there is a tendency of engineering sectors, sustainability, environmental, safety and especially in risk mappings, treat the technological issues in a neutral manner, separating the technological research projects of social influences. I want to contribute to the advancement of the debate on stakeholder engagement and adopting as focus on the company's relationship with the community, the aim of this study was to understand how a social project held by one of the largest mining companies in Brazil contributed to the process of SLO. This methodological procedure adopted was a qualitative, descriptive, and exploratory interviews with the communities located in rural areas of direct influence of the company's approach. The results show that the strategy adopted by the company contributed to the process of SLO, furthermore it is necessary adopt strong methodologies that facilitate the engagement processes of the other company's stakeholders, as well as the challenge to keep on local legitimacy earned. Key words: Mining, social license to operate (SLO), social impact, corporate social responsibility, stakeholders. References: * FRANKS, DANIEL M.; COHEN, TAMAR. Social Licence in Design: Constructive technology assessment within a mineral research and development institution. Centre for Social Responsibility in Mining, Sustainable Minerals Institute, University of Queensland, Australia. 79 122 Technological Forecasting & Social Change. 2012.

  3. Recycling of mixed wastes using Quantum-CEP{trademark}

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sameski, B.

    1997-02-01

    The author describes the process that M4 Environmental Management, Inc., is commercializing for the treatment of mixed wastes. He summarizes the types of wastes which the process can be applied to, the products which come out of the process, and examples of various waste streams which have been processed. The process is presently licensed to treat mixed wastes and the company has in place contracts for such services. The process uses a molten metal bath to catalyze reactions which break the incoming products down to an atomic level, and allow different process steams to be tapped at the output end.

  4. 47 CFR 90.528 - Public safety broadband license.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... licensed if: (i) International agreements require coordination; (ii) Submission of an environmental... 47 Telecommunication 5 2011-10-01 2011-10-01 false Public safety broadband license. 90.528 Section 90.528 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO...

  5. 10 CFR 51.20 - Criteria for and identification of licensing and regulatory actions requiring environmental...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Criteria for and identification of licensing and regulatory actions requiring environmental impact statements. 51.20 Section 51.20 Energy NUCLEAR REGULATORY... the Commission, in the exercise of its discretion, has determined should be covered by an...

  6. 10 CFR 51.50 - Environmental report-construction permit, early site permit, or combined license stage.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2011-01-01 2011-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...

  7. 10 CFR 51.50 - Environmental report-construction permit, early site permit, or combined license stage.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2013-01-01 2013-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...

  8. 10 CFR 51.50 - Environmental report-construction permit, early site permit, or combined license stage.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2010-01-01 2010-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...

  9. 10 CFR 51.50 - Environmental report-construction permit, early site permit, or combined license stage.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2014-01-01 2014-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...

  10. 10 CFR 51.50 - Environmental report-construction permit, early site permit, or combined license stage.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2012-01-01 2012-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...

  11. 76 FR 55723 - Final Supplemental Environmental Impact Statement, Sequoyah Nuclear Plant Units 1 and 2 License...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-08

    ... environmentally unacceptable conditions. Following the events at the Fukushima (Japan) Daiichi Nuclear Power Plant... the Fukushima accident is unlikely to occur at any TVA plant. Nonetheless, the effort has resulted in... the Fukushima Dai-ichi Accident, concluded that continued operation and continued licensing activities...

  12. 78 FR 1267 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-08

    ... CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared for these.... The operational and management controls, as described in Nuclear Energy Institute (NEI) 08-09... in Nuclear Energy Institute (NEI) 08-09, Revision 6, would be implemented concurrent with the full...

  13. 77 FR 47123 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-07

    ...-Water Reactors] Steam Generator Tubes'' [Reference 7] and NEI [Nuclear Energy Institute] 97-06, ``Steam... CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared for these... the required structural margins of the SG tubes for both normal and accident conditions. Nuclear...

  14. Optimizing Characterization of Site Hydrology in Support of New Reactor Licensing at the U.S. Nuclear Regulatory Commission (Invited)

    NASA Astrophysics Data System (ADS)

    Nicholson, T. J.; Raione, R.; Ahn, H.; Barnhurst, D.; Giacinto, J.; McBride, M.; Tiruneh, N. D.

    2009-12-01

    The NRC regulates the civilian use of radioactive materials and facilities in an open and transparent manner. The NRC regulatory criteria are designed to protect human health and safety, and the environment by regulating nuclear facilities. During review of new reactor licensing applications, NRC staff reviews and independently verifies hydrogeologic information submitted by the applicant in several topical areas such as development and testing of Conceptual Site Models (CSM) which may involve perched aquifers; engineered water level fluctuations of surface-water reservoirs; ground-water collector wells and local ground-water uses; design-basis ground-water levels for structural analysis; analysis of scenarios for potential release of radionuclides to the subsurface; deep well injection of effluents; and monitoring to detect radionuclide releases. This information is reviewed in a systematic manner in accordance with NRC requirements and guidance to evaluate safety and environmental impacts and reduce the uncertainties for these impacts. NRC licensing staff is reviewing 14 applications for siting new reactors. Experience gained through these licensing activities has shown the value of using site-specific data to evaluate the CSM and its use to assess design and operational issues. Optimizing the information flow process through a systemically and thorough review process creates efficiencies. Through an iterative process of evaluating various geographical settings and associated ground-water conditions, NRC staff has developed methods to minimize prediction uncertainty through the use of confirmatory analyses performed under conservative, hierarchal approaches.

  15. 75 FR 30451 - Duke Energy Carolinas, LLC; Duke Energy Carolinas, LLC; William States Lee III Combined License...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-01

    ... Energy Carolinas, LLC; William States Lee III Combined License Application; Notice of Intent To Conduct a... environmental review of the William States Lee III Nuclear Station, Units 1 and 2 combined licenses application...-licensing/col/lee.html '' to `` http://www.nrc.gov/reactors/new-reactors/col/lee.html ''. Dated at Rockville...

  16. 15 CFR 960.11 - Conditions for operation.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... ENVIRONMENTAL DATA SERVICE LICENSING OF PRIVATE REMOTE SENSING SYSTEMS Licenses § 960.11 Conditions for... performance, including, but not limited to, limitations on data collection and dissemination, as appropriate... Administrator records of system tasking, operations and other data as specified in the license for the purposes...

  17. 15 CFR 960.11 - Conditions for operation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... ENVIRONMENTAL DATA SERVICE LICENSING OF PRIVATE REMOTE SENSING SYSTEMS Licenses § 960.11 Conditions for... performance, including, but not limited to, limitations on data collection and dissemination, as appropriate... Administrator records of system tasking, operations and other data as specified in the license for the purposes...

  18. 15 CFR 960.11 - Conditions for operation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... ENVIRONMENTAL DATA SERVICE LICENSING OF PRIVATE REMOTE SENSING SYSTEMS Licenses § 960.11 Conditions for... performance, including, but not limited to, limitations on data collection and dissemination, as appropriate... Administrator records of system tasking, operations and other data as specified in the license for the purposes...

  19. 75 FR 63518 - Notice of Availability of Environmental Assessment and Finding of No Significant Impact for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-15

    ... Environmental Assessment and Finding of No Significant Impact for License Amendment No. 61 for Rio Algom Mining... amendment to Source Materials License SUA-1473 issued to Rio Algom Mining LLC (Rio Algom, or the Licensee... access the NRC's Agencywide Document Access and Management System (ADAMS), which provides text and image...

  20. 10 CFR 51.108 - Public hearings on Commission findings that inspections, tests, analyses, and acceptance criteria...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... CFR 52.103(b), the Commission will not admit any contentions on environmental issues, the adequacy of the environmental impact statement for the combined license issued under subpart C of part 52, or the... finding under 10 CFR 52.103(g). [72 FR 49517, Aug. 28, 2007] materials licenses ...

  1. 10 CFR 51.108 - Public hearings on Commission findings that inspections, tests, analyses, and acceptance criteria...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... CFR 52.103(b), the Commission will not admit any contentions on environmental issues, the adequacy of the environmental impact statement for the combined license issued under subpart C of part 52, or the... finding under 10 CFR 52.103(g). [72 FR 49517, Aug. 28, 2007] materials licenses ...

  2. 10 CFR 51.108 - Public hearings on Commission findings that inspections, tests, analyses, and acceptance criteria...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... CFR 52.103(b), the Commission will not admit any contentions on environmental issues, the adequacy of the environmental impact statement for the combined license issued under subpart C of part 52, or the... finding under 10 CFR 52.103(g). [72 FR 49517, Aug. 28, 2007] materials licenses ...

  3. 15 CFR 960.11 - Conditions for operation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... ENVIRONMENTAL DATA SERVICE LICENSING OF PRIVATE REMOTE SENSING SYSTEMS Licenses § 960.11 Conditions for... all facilities which comprise the remote sensing space system for the purpose of conducting license... possession, the licensee shall offer such data to the National Satellite Land Remote Sensing Data Archive at...

  4. 15 CFR 970.102 - Nature of licenses.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 15 Commerce and Foreign Trade 3 2014-01-01 2014-01-01 false Nature of licenses. 970.102 Section 970.102 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued... ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES General § 970.102 Nature of...

  5. 15 CFR 970.102 - Nature of licenses.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 15 Commerce and Foreign Trade 3 2012-01-01 2012-01-01 false Nature of licenses. 970.102 Section 970.102 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued... ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES General § 970.102 Nature of...

  6. 15 CFR 970.102 - Nature of licenses.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Nature of licenses. 970.102 Section 970.102 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued... ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES General § 970.102 Nature of...

  7. 15 CFR 970.102 - Nature of licenses.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 15 Commerce and Foreign Trade 3 2013-01-01 2013-01-01 false Nature of licenses. 970.102 Section 970.102 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued... ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES General § 970.102 Nature of...

  8. 15 CFR 970.102 - Nature of licenses.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Nature of licenses. 970.102 Section 970.102 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued... ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES General § 970.102 Nature of...

  9. 15 CFR 960.7 - Amendments to licenses.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Amendments to licenses. 960.7 Section 960.7 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued) NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE LICENSING OF PRIVATE REMOTE...

  10. 15 CFR 970.207 - Antitrust information.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Applications Contents § 970... license, provided that said agreement relates to deep seabed hard mineral resource exploration or mining...

  11. 15 CFR 970.207 - Antitrust information.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Applications Contents § 970... license, provided that said agreement relates to deep seabed hard mineral resource exploration or mining...

  12. 15 CFR 970.207 - Antitrust information.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Applications Contents § 970... license, provided that said agreement relates to deep seabed hard mineral resource exploration or mining...

  13. 15 CFR 970.207 - Antitrust information.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Applications Contents § 970... license, provided that said agreement relates to deep seabed hard mineral resource exploration or mining...

  14. 15 CFR 970.207 - Antitrust information.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Applications Contents § 970... license, provided that said agreement relates to deep seabed hard mineral resource exploration or mining...

  15. Conducting a FERC environmental assessment: a case study and recommendations from the Terror Lake Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Olive, S.W.; Lamb, B.L.

    This paper is an account of the process that evolved during acquisition of the license to operate the Terror Lake hydro-electric power project under the auspices of the Federal Energy Regulatory Commission (FERC). The Terror River is located on Kodiak Island in Alaska. The river is within the Kodiak National Wildlife Refuge; it supports excellent runs of several species of Pacific Salmon which are both commercially important and a prime source of nutrition for the Kodiak brown bear. This paper discusses both the fish and wildlife questions, but concentrates on instream uses and how protection of these uses was decided.more » In this focus the paper explains the FERC process, gives a history of the Terror Lake Project, and, ultimately, makes recommendations for improved management of controversies within the context of FERC licensing procedures. 64 references.« less

  16. The role of environmental accidental risk assessment in the process of granting development consent.

    PubMed

    Kontic, Branko; Gerbec, Marko

    2009-11-01

    Environmental impact assessment (EIA) is a procedure that must be followed for certain types of development before they are granted development consent. The procedure requires the developer to compile an environmental impact report (EIR) describing the likely significant effects of the project on the environment. A regulatory requirement in Slovenia is that an accidental risk assessment for a new installation should be a part of an EIR. The article shows how risk assessment (RA) related to accidental release of methylene diphenyl diisocyanate (MDI) or a polyvalent alcohol mixture from a new planned unit of a chemical factory in the Alpine region of Slovenia was performed in the framework of an EIA for the purpose of obtaining a construction permit. Two accidental scenarios were considered: (a) a spill of 20 m(3) of MDI or polyvalent alcohol mixture into the river Soca (the river runs close to the chemical factory) and (b) a fire in the warehouse storing the raw material, where emission of toxic gases HCN, NO(x), and CO is expected during combustion of MDI. One of the most important results of this case is the agreement among the developer, the competent authority, and a consultant in the field of EIA and RA to positively conclude the licensing process despite the absence of formal (regulatory) limit values for risk. It has been approved that transparent, reasonably uncertain, and semi-quantitative environmental risk assessment is an inevitable component of an EIA, and an essential factor in informed, licensing-related decision making.

  17. Building a Snow Data Management System using Open Source Software (and IDL)

    NASA Astrophysics Data System (ADS)

    Goodale, C. E.; Mattmann, C. A.; Ramirez, P.; Hart, A. F.; Painter, T.; Zimdars, P. A.; Bryant, A.; Brodzik, M.; Skiles, M.; Seidel, F. C.; Rittger, K. E.

    2012-12-01

    At NASA's Jet Propulsion Laboratory free and open source software is used everyday to support a wide range of projects, from planetary to climate to research and development. In this abstract I will discuss the key role that open source software has played in building a robust science data processing pipeline for snow hydrology research, and how the system is also able to leverage programs written in IDL, making JPL's Snow Data System a hybrid of open source and proprietary software. Main Points: - The Design of the Snow Data System (illustrate how the collection of sub-systems are combined to create a complete data processing pipeline) - Discuss the Challenges of moving from a single algorithm on a laptop, to running 100's of parallel algorithms on a cluster of servers (lesson's learned) - Code changes - Software license related challenges - Storage Requirements - System Evolution (from data archiving, to data processing, to data on a map, to near-real-time products and maps) - Road map for the next 6 months (including how easily we re-used the snowDS code base to support the Airborne Snow Observatory Mission) Software in Use and their Software Licenses: IDL - Used for pre and post processing of data. Licensed under a proprietary software license held by Excelis. Apache OODT - Used for data management and workflow processing. Licensed under the Apache License Version 2. GDAL - Geospatial Data processing library used for data re-projection currently. Licensed under the X/MIT license. GeoServer - WMS Server. Licensed under the General Public License Version 2.0 Leaflet.js - Javascript web mapping library. Licensed under the Berkeley Software Distribution License. Python - Glue code and miscellaneous data processing support. Licensed under the Python Software Foundation License. Perl - Script wrapper for running the SCAG algorithm. Licensed under the General Public License Version 3. PHP - Front-end web application programming. Licensed under the PHP License Version 3.01

  18. 15 CFR 970.900 - Other applicable regulations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Miscellaneous § 970.900 Other... surrender of licenses and permits, amendment of regulations, competition of time, uniform hearing procedures...

  19. 75 FR 11576 - Energy Northwest; Notice of Intent To Prepare an Environmental Impact Statement and Conduct the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-11

    ... Generating Station Energy Northwest has submitted an application for renewal of Facility Operating License No... license for CGS expires on December 20, 2023. The application for renewal, dated January 19, 2010, was... and opportunity for hearing regarding renewal of the facility operating licenses is also being...

  20. 75 FR 7631 - Notice of Environmental Assessment Related to the Issuance of a License Amendment to Byproduct...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-22

    ... unsealed Hydrogen-3 and Carbon-14 for use during in-vitro research labeling activities. However, through... Hydrogen-3 was the only licensed material used in the facility. The licensee permanently ceased licensed... licensee's historical review of past research activities determined that Hydrogen-3 was the only...

  1. 10 CFR 51.109 - Public hearings in proceedings for issuance of materials license with respect to a geologic...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Public hearings in proceedings for issuance of materials license with respect to a geologic repository. 51.109 Section 51.109 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS...

  2. 15 CFR 970.402 - Technological capability.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Certification of Applications... possess or have access to, at the time of issuance or transfer of the license, the technology and...

  3. Wave energy: a Pacific perspective.

    PubMed

    Paasch, Robert; Ruehl, Kelley; Hovland, Justin; Meicke, Stephen

    2012-01-28

    This paper illustrates the status of wave energy development in Pacific rim countries by characterizing the available resource and introducing the region's current and potential future leaders in wave energy converter development. It also describes the existing licensing and permitting process as well as potential environmental concerns. Capabilities of Pacific Ocean testing facilities are described in addition to the region's vision of the future of wave energy.

  4. 10 CFR Appendix B to Subpart A of... - Environmental Effect of Renewing the Operating License of a Nuclear Power Plant

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Environmental Effect of Renewing the Operating License of a Nuclear Power Plant B Appendix B to Subpart A of Part 51 Energy NUCLEAR REGULATORY COMMISSION... near these plants could be of moderate significance in some situations. See § 51.53(c)(3)(ii)(A...

  5. 75 FR 66398 - Notice of Availability of the Draft Supplement 45 to the Generic Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-28

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-272, 50-311, and 50-354; NRC-2009-0390 and NRC-2009- 0391] Notice of Availability of the Draft Supplement 45 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants, and Public Meetings for the License Renewal of Hope Creek Generating Station and Salem Nuclear Generating...

  6. 15 CFR 970.515 - Duration of a license.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Issuance/Transfer/Terms... Administrator, based on the criteria, and for the length of time, specified in paragraph (b) of this section. ...

  7. Environmental contexts of combined alcohol and energy drink use: Associations with intoxication in licensed venues.

    PubMed

    Droste, Nicolas; Miller, Peter; Pennay, Amy; Zinkiewicz, Lucy; Lubman, Dan I

    2016-10-01

    Environmental factors inside licensed venues have been found to influence the intoxication levels and consumption practices of patrons. The consumption of alcohol mixed with energy drinks (AmED) occurs primarily at or prior to attending licensed venues, however there is a lack of in situ research investigating AmED use in these contexts. Given that AmED use has been linked with increased alcohol consumption, intoxication, illicit substance use, and risk taking behaviours, this paper explores the environmental correlates and levels of intoxication associated with AmED use in licensed venues. Structured observations were undertaken in five Australian cities on Friday and Saturday nights. Covert teams spent 4-5h in venues and recorded hourly observations on patron, venue, and staff characteristics, alcohol, illicit drug and AmED consumption patterns and intoxication levels. 898 hourly observations were recorded across 68 venues. All but one venue served energy drinks, and patron AmED use was observed during 34.9% of hourly records. AmED use was more prevalent after 12am and in nightclub venues compared to bars and pubs, and was positively associated with high intoxication levels, illicit drug use, and younger crowds. After controlling for environmental factors (i.e. venue crowding, service practices, venue characteristics, patron demographics and behaviour) AmED use did not predict high intoxication at a venue level in multivariable models. AmED consumption is ubiquitous in the licensed venues of Australian night-time entertainment districts, particularly busy nightclub venues where intoxication and risky consumption are heightened. However, AmED use was not associated with high patron intoxication when environmental factors were considered. Copyright © 2016 Elsevier B.V. All rights reserved.

  8. 15 CFR 971.803 - Relinquishment and surrender of licenses and permits.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR COMMERCIAL... licensee or permittee may at any time, without penalty: (1) Surrender to the Administrator a license or...

  9. 15 CFR 960.8 - Notification of foreign agreements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... THE ENVIRONMENTAL DATA SERVICE LICENSING OF PRIVATE REMOTE SENSING SYSTEMS Licenses § 960.8... Remote Sensing Data Archive; and (3) The obligations of the licensee to convey to the foreign party the...

  10. 76 FR 13973 - United States Warehouse Act; Processed Agricultural Products Licensing Agreement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-15

    ... license for the processed agricultural products that are stored in climate controlled, cooler, and freezer..., and dry beans. Warehouse operators voluntarily agree to be licensed, observe the rules for licensing... program for processed agricultural products that are stored in climate controlled, cooler, and freezer...

  11. The influenza vaccine licensing process.

    PubMed

    Wood, J M; Levandowski, R A

    2003-05-01

    Influenza vaccines are unique because they require a licensing process which includes a procedure for rapid annual updates to vaccine strains. The licensing procedures in the European Union and the USA are described as examples. In the event of an influenza pandemic, vaccines will be required urgently and licensing process should reflect such needs.

  12. Conducting a FERC environmental assessment: a case study and recommendations from the Terror Lake Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Olive, S.W.; Lamb, B.L.

    This paper is an account of the process that evolved during acquisition of the license to operate the Terror Lake hydroelectric power project under the auspices of the Federal Energy Regulatory Commission (FERC). The Commission is responsible for granting these licenses under the Federal Power Act (16 U.S.C. 792 et seq.). This act provides, in part, that FERC may condition a license to protect the public interest. The public interest in these cases has come to include both instream and terrestrial values. The Terror River is located on Kodiak Island in Alaska. The river is within the Kodiak National Wildlifemore » Refuge; it supports excellent runs of several species of Pacific Salmon which are both commercially important and a prime source of nutrition for the Kodiak brown bear. The river is also a prime resource for generating electric power. One major concern in the negotiations was the impact of land disturbance and management practices on brown bear habitat - i.e., protection of the brown bear. Maintenance of the bears' habitat is the main purpose of the Kodiak National Wildlife Refuge. But, like many other projects, resolving the instream flow issue was of major importance in the issuance of the FERC license. This paper discusses the fish and wildlife questions, but concentrates on instream uses and how protection of these uses was decided. With this as a focus, the paper explains the FERC process, gives a history of the Terror Lake Project, and, ultimately, makes recommendations for improved management of controversies within the context of the FERC licensing procedures. 65 references.« less

  13. 77 FR 21593 - V. C. Summer Nuclear Station, Units 2 and 3 Combined Licenses and Record of Decision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-10

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. 052-00027 and 052-00028; NRC-2008-0441] V. C. Summer... Licenses for Virgil C. Summer Nuclear Station, Units 2 and 3'' ML11098A044 NUREG-1939, Vol 1, ``Final Environmental Impact Statement for Combined Licenses for Virgil C. Summer Nuclear Station, Units 2 and 3...

  14. 77 FR 77118 - Notice of Availability of Environmental Assessment and Finding of No Significant Impact for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-31

    ... Department of Agriculture, Beltsville, MD AGENCY: Nuclear Regulatory Commission. ACTION: Notice of... license amendment to NRC License No. 19-00915-03, issued to the United States Department of Agriculture...

  15. 14 CFR 431.93 - Environmental information.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Environmental information. 431.93 Section..., DEPARTMENT OF TRANSPORTATION LICENSING LAUNCH AND REENTRY OF A REUSABLE LAUNCH VEHICLE (RLV) Environmental Review § 431.93 Environmental information. An applicant shall submit environmental information concerning...

  16. 10 CFR 51.30 - Environmental assessment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Environmental assessment. 51.30 Section 51.30 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act-Regulations Implementing Section 102(2...

  17. Site dose calculations for the INEEL/TMI-2 storage facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jones, K.B.

    1997-12-01

    The U.S. Department of Energy (DOE) is licensing an independent spent-fuel storage installation (ISFSI) for the Three Mile Island unit 2 (TMI-2) core debris to be constructed at the Idaho Chemical Processing Plant (ICPP) site at the Idaho National Engineering and Environmental Laboratory (INEEL) using the NUHOMS spent-fuel storage system. This paper describes the site dose calculations, performed in support of the license application, that estimate exposures both on the site and for members of the public. These calculations are unusual for dry-storage facilities in that they must account for effluents from the system in addition to skyshine from themore » ISFSI. The purpose of the analysis was to demonstrate compliance with the 10 CFR 20 and 10 CFR 72.104 exposure limits.« less

  18. Evaluation of the EIA system on the Island of Mauritius and development of an environmental monitoring plan framework

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ramjeawon, T.; Beedassy, R

    The Environment Protection Act (EPA) in Mauritius provides for the application of an EIA license in respect of undertakings listed in its first schedule. Following the promulgation of the Act in June 1993, the Department of Environment (DOE) is issuing an average of 125 EIA licenses yearly. In general, the review exercise of an environmental impact assessment (EIA) is terminated once the license has been granted. The aim of this project was to evaluate the EIA system in Mauritius and to identify its weaknesses and strengths. One of the main weaknesses, besides the lack of EIA audits, is the absencemore » of EIA follow-up monitoring. It is necessary to distinguish between monitoring done for regulatory purposes (compliance monitoring) and environmental monitoring related to the EIA. With the growth of the tourism industry on the island, coastal development projects have the potential to cause significant environmental impacts . A sample of EIA reports pertaining to this sector was assessed for its quality and follow-up mechanisms. Proposals for the contents of EIA Prediction Audits, Environmental Monitoring Plans (EMP) and the format for an EMP report are made.« less

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Muldoon, Joe; Yankovich, Tamara; Schramm, Laurier L.

    The Gunnar Mine and mill site was the largest of some 38 now-abandoned uranium mines that were developed and operated in Northern Saskatchewan, Canada, during the Cold War years. During their operating lifetimes these mines produced large quantities of ore and tailings. The Gunnar mine (open pit and underground) produced over 5 million tonnes of uranium ore and nearly 4.4 million tonnes of mine tailings during its operations from 1955 through 1963. An estimated 2.2 to 2.7 million m{sup 3} of waste rock that was generated during the processing of the ore abuts the shores of Lake Athabasca, the 22.more » largest lake in the world. After closure in the 1960's, the Gunnar site was abandoned with little to no decommissioning being done. The Saskatchewan Research Council has been contracted to manage the clean-up of these abandoned northern uranium mine and mill sites. The Gunnar Mine, because of the magnitude of tailings and waste rock, is subject to an environmental site assessment process regulated by both provincial and federal governments. This process requires a detailed study of the environmental impacts that have resulted from the mining activities and an analysis of projected impacts from remediation efforts. The environmental assessment process, specific site studies, and public involvement initiatives are all now well underway. Due to the many uncertainties associated with an abandoned site, an adaptive remediation approach, utilizing a decision tree, presented within the environmental assessment documents will be used as part of the site regulatory licensing. A critical early task was dealing with major public safety hazards on the site. The site originally included many buildings that were remnants of a community of approximately 800 people who once occupied the site. These buildings, many of which contained high levels of asbestos, had to be appropriately abated and demolished. Similarly, the original mine head frame and mill site buildings, many of which still contained the original machinery and equipment, also had to be dismantled. Remediation options for the accumulated demolition debris have been assessed, as have remediation options for the waste rock and tailings, all of which form part of the environmental assessment. The regulatory requirements include the environmental assessment processes, a complex public involvement strategy, and licensing from the Canadian Nuclear Safety Commission (CNSC) with the long-term goal of releasing the property in a remediated and stable state to the Province of Saskatchewan. Prescribed environmental and land use endpoints will be determined based on the environmental assessment studies and remediation options analyzed and implemented. Ultimately, the site will be released into an institutional controls program that will allow long-term government management and monitoring. (authors)« less

  20. 10 CFR 51.53 - Postconstruction environmental reports.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... impact statement; supplements to the final environmental impact statement, including supplements prepared at the license renewal stage; NRC staff-prepared final generic environmental impact statements; and... reflect new information in addition to that discussed in the final environmental impact statement prepared...

  1. 10 CFR 51.71 - Draft environmental impact statement-contents.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Draft environmental impact statement-contents. 51.71 Section 51.71 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act-Regulations...

  2. 76 FR 50274 - Terrestrial Environmental Studies for Nuclear Power Stations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-12

    ... NUCLEAR REGULATORY COMMISSION [NRC-2011-0182] Terrestrial Environmental Studies for Nuclear Power... draft regulatory guide (DG), DG-4016, ``Terrestrial Environmental Studies for Nuclear Power Stations... environmental studies and analyses supporting licensing decisions for nuclear power reactors. DATES: Submit...

  3. 10 CFR 51.41 - Requirement to submit environmental information.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Requirement to submit environmental information. 51.41 Section 51.41 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act-Regulations...

  4. 10 CFR 51.31 - Determinations based on environmental assessment.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Determinations based on environmental assessment. 51.31 Section 51.31 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act-Regulations...

  5. 10 CFR 51.31 - Determinations based on environmental assessment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Determinations based on environmental assessment. 51.31 Section 51.31 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act-Regulations...

  6. 10 CFR 51.67 - Environmental information concerning geologic repositories.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Environmental information concerning geologic repositories. 51.67 Section 51.67 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act...

  7. 10 CFR 51.41 - Requirement to submit environmental information.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Requirement to submit environmental information. 51.41 Section 51.41 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act-Regulations...

  8. 10 CFR 51.90 - Final environmental impact statement-general.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Final environmental impact statement-general. 51.90 Section 51.90 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act-Regulations...

  9. 10 CFR 51.55 - Environmental report-standard design certification.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Environmental report-standard design certification. 51.55 Section 51.55 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act-Regulations...

  10. 10 CFR 51.91 - Final environmental impact statement-contents.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Final environmental impact statement-contents. 51.91 Section 51.91 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act-Regulations...

  11. 10 CFR 51.66 - Environmental report-number of copies; distribution.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Section 51.66 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act-Regulations... submit to the Director of Nuclear Material Safety and Safeguards an environmental report or any...

  12. The Swedish radiological environmental protection regulations applied in a review of a license application for a geological repository for spent nuclear fuel.

    PubMed

    Andersson, Pål; Stark, Karolina; Xu, Shulan; Nordén, Maria; Dverstorp, Björn

    2017-11-01

    For the first time, a system for specific consideration of radiological environmental protection has been applied in a major license application in Sweden. In 2011 the Swedish Nuclear Fuel & Waste Management Co. (SKB) submitted a license application for construction of a geological repository for spent nuclear fuel at the Forsmark site. The license application is supported by a post-closure safety assessment, which in accordance with regulatory requirements includes an assessment of environmental consequences. SKB's environmental risk assessment uses the freely available ERICA Tool. Environmental media activity concentrations needed as input to the tool are calculated by means of complex biosphere modelling based on site-specific information gathered from site investigations, as well as from supporting modelling studies and projections of future biosphere conditions in response to climate change and land rise due to glacial rebound. SKB's application is currently being reviewed by the Swedish Radiation Safety Authority (SSM). In addition to a traditional document review with an aim to determine whether SKB's models are relevant, correctly implemented and adequately parametrized, SSM has performed independent modelling in order to gain confidence in the robustness of SKB's assessment. Thus, SSM has used alternative stylized reference biosphere models to calculate environmental activity concentrations for use in subsequent exposure calculations. Secondly, an alternative dose model (RESRAD-BIOTA) is used to calculate doses to biota that are compared with SKB's calculations with the ERICA tool. SSM's experience from this review is that existing tools for environmental dose assessment are possible to use in order to show compliance with Swedish legislation. However, care is needed when site representative species are assessed with the aim to contrast them to generic reference organism. The alternative modelling of environmental concentrations resulted in much lower concentrations compared to SKB's results. However, SSM judges that SKB's in this part conservative approach is relevant for a screening assessment. SSM also concludes that there are big differences in dose rates calculated to different organisms depending on which tool that is used, although not systematically higher for either of them. Finally, independent regulatory modelling has proven valuable for SSM's review in gaining understanding and confidence in SKB's assessment presented in the license application. Copyright © 2017 Elsevier Ltd. All rights reserved.

  13. 10 CFR 51.81 - Distribution of draft environmental impact statement.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Distribution of draft environmental impact statement. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Materials Licenses § 51.81 Distribution of draft environmental impact statement. Copies of the draft environmental impact statement and...

  14. 10 CFR 51.81 - Distribution of draft environmental impact statement.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Distribution of draft environmental impact statement. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Materials Licenses § 51.81 Distribution of draft environmental impact statement. Copies of the draft environmental impact statement and...

  15. 10 CFR 51.81 - Distribution of draft environmental impact statement.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Distribution of draft environmental impact statement. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Materials Licenses § 51.81 Distribution of draft environmental impact statement. Copies of the draft environmental impact statement and...

  16. 10 CFR 51.81 - Distribution of draft environmental impact statement.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Distribution of draft environmental impact statement. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Materials Licenses § 51.81 Distribution of draft environmental impact statement. Copies of the draft environmental impact statement and...

  17. 43 CFR 3410.2-2 - Environmental analysis.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Environmental analysis. 3410.2-2 Section... § 3410.2-2 Environmental analysis. (a) Before an exploration license may be issued, the authorized officer shall prepare an environmental assessment or environmental impact statement, if necessary, of the...

  18. 10 CFR 51.81 - Distribution of draft environmental impact statement.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Distribution of draft environmental impact statement. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Materials Licenses § 51.81 Distribution of draft environmental impact statement. Copies of the draft environmental impact statement and...

  19. 10 CFR 51.29 - Scoping-environmental impact statement and supplement to environmental impact statement.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Scoping-environmental impact statement and supplement to environmental impact statement. 51.29 Section 51.29 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National...

  20. 14 CFR 415.201 - General.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false General. 415.201 Section 415.201 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LAUNCH LICENSE Environmental Review § 415.201 General. An applicant shall provide the...

  1. 14 CFR 415.201 - General.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false General. 415.201 Section 415.201 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LAUNCH LICENSE Environmental Review § 415.201 General. An applicant shall provide the...

  2. 10 CFR 52.110 - Termination of license.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS... final legally effective order to permanently cease operations has come into effect, the 10 CFR part 52... reasons for concluding that the environmental impacts associated with site-specific decommissioning...

  3. 10 CFR 51.68 - Environmental report-rulemaking.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act-Regulations Implementing... special nuclear material shall submit with the petition a separate document entitled “Petitioner's...

  4. A quantitative integrated assessment of pollution prevention achieved by integrated pollution prevention control licensing.

    PubMed

    Styles, David; O'Brien, Kieran; Jones, Michael B

    2009-11-01

    This paper presents an innovative, quantitative assessment of pollution avoidance attributable to environmental regulation enforced through integrated licensing, using Ireland's pharmaceutical-manufacturing sector as a case study. Emissions data reported by pharmaceutical installations were aggregated into a pollution trend using an Environmental Emissions Index (EEI) based on Lifecycle Assessment methodologies. Complete sectoral emissions data from 2001 to 2007 were extrapolated back to 1995, based on available data. Production volume data were used to derive a sectoral production index, and determine 'no-improvement' emission trends, whilst questionnaire responses from 20 industry representatives were used to quantify the contribution of integrated licensing to emission avoidance relative to these trends. Between 2001 and 2007, there was a 40% absolute reduction in direct pollution from 27 core installations, and 45% pollution avoidance relative to hypothetical 'no-improvement' pollution. It was estimated that environmental regulation avoided 20% of 'no-improvement' pollution, in addition to 25% avoidance under business-as-usual. For specific emissions, avoidance ranged from 14% and 30 kt a(-1) for CO(2) to 88% and 598 t a(-1) for SO(x). Between 1995 and 2007, there was a 59% absolute reduction in direct pollution, and 76% pollution avoidance. Pollution avoidance was dominated by reductions in emissions of VOCs, SO(x) and NO(x) to air, and emissions of heavy metals to water. Pollution avoidance of 35% was attributed to integrated licensing, ranging from between 8% and 2.9 t a(-1) for phosphorus emissions to water to 49% and 3143 t a(-1) for SO(x) emissions to air. Environmental regulation enforced through integrated licensing has been the major driver of substantial pollution avoidance achieved by Ireland's pharmaceutical sector - through emission limit values associated with Best Available Techniques, emissions monitoring and reporting requirements, and performance targets specified in environmental management plans. This compliant sector offers a positive, but not necessarily typical, case study of IPPC effectiveness.

  5. 10 CFR 51.66 - Environmental report-number of copies; distribution.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Environmental report-number of copies; distribution. 51.66 Section 51.66 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act-Regulations...

  6. Process evaluation of an environmental health risk audit and action plan intervention to reduce alcohol related violence in licensed premises.

    PubMed

    Williams, Annie; Moore, Simon C; Shovelton, Claire; Moore, Laurence; Murphy, Simon

    2016-05-28

    Alcohol-related violence is associated with licensed premise environments and their management. There is a lack of evidence for effective interventions to address these, and there are significant barriers to implementation. This study aims to understand how development and implementation processes can facilitate intervention reach, fidelity and receipt and therefore provides key process data necessary to interpret the results of the randomised controlled trial conducted in parallel. A process evaluation, embedded within a randomised controlled trial. Intervention development and implementation were assessed via focus groups (n = 2) and semi-structured interviews (n = 22) with Environmental Health Practitioners (EHPs). Reach and fidelity were assessed via routinely collected intervention data, which was was collected from 276 licenced premises across Wales, UK. Case study semi-structured interviews with licensed premises proprietors (n = 30) explored intervention receipt. Intervention co-production with senior EHPs facilitated organisational adoption and implementation. Training events for EHPs played an important role in addressing wider organisational concerns regarding partnership working and the contextual integration of the intervention. EHPs delivered the intervention to 98 % of intervention premises; 35 % of premises should have received a follow up enforcement visit, however EHP confidence in dealing with alcohol risk factors meant only 7 % of premises received one. Premises therefore received a similar intervention dose regardless of baseline risk. Intervention receipt appeared to be greatest in premises with an existing commitment to prevention and those in urban environments. The study suggests that a collaborative approach to the development and diffusion of interventions is associated with high levels of organisational adoption, implementation and reach. However, the lack of enforcement visits represents implementation failure for a key mechanism of action that is likely to influence intervention effectiveness. To be effective, any future intervention may require a longer implementation period to develop EHP confidence in using enforcement approaches in this area and multiagency enforcement support, which includes the police, to deliver an adequate intervention dose.

  7. 10 CFR 51.25 - Determination to prepare environmental impact statement or environmental assessment; eligibility...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Determination to prepare environmental impact statement or environmental assessment; eligibility for categorical exclusion. 51.25 Section 51.25 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY...

  8. 10 CFR 51.25 - Determination to prepare environmental impact statement or environmental assessment; eligibility...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Determination to prepare environmental impact statement or environmental assessment; eligibility for categorical exclusion. 51.25 Section 51.25 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY...

  9. 75 FR 81037 - Waste Confidence Decision Update

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-23

    ... well beyond the current analysis that supports at least 60 years of post-licensed life storage with... environmental factors including surrounding population density, water resources, seismicity, subsurface geology... expiration of the 60-year post licensed life period, the Commission will revisit the Waste Confidence...

  10. Canadian regulatory requirements for recombinant fish vaccines.

    PubMed

    Sethi, M S; Gifford, G A; Samagh, B S

    1997-01-01

    In Canada, veterinary biological products derived by using conventional and new techniques of biotechnology are licensed and regulated under the Health of Animals Act and Regulations. Biological products include vaccines, bacterins, bacterin-toxoids and diagnostic kits which are used for the prevention, treatment or diagnosis of infectious diseases in all species of animals, including fish. Veterinary biologicals are licensed on the basis of fulfillment of four criteria: purity, potency, safety and efficacy. A risk-based approach is used to evaluate the safety of the product in target species, as well as non-target species, humans and the environment. On the basis of biological characteristics, biotechnology derived veterinary biologicals have been divided into two broad categories, high and low risk products. The paper describes the regulatory framework for the licensing of veterinary biologicals in Canada, with emphasis on the regulatory considerations for recombinant fish vaccines. Stages of movement of the product from research in a contained laboratory facility to a fully licensed product for free sale are discussed. The requirements for field testing and environmental assessment involved in these stages are highlighted. Manufacturers and researchers who intend to commercialize experimental vaccines are encouraged to consult with the Veterinary Biologics and Biotechnology Section early in the product development process so that the research data and quality assurance documentation are consistent with regulatory requirements.

  11. Negotiating Terms and Conditions: An Overview of the Federal Energy Regulatory Commission Hydropower Settlement Agreement Process

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Levine, Aaron L; Curtis, Taylor L; Shields, Laura

    The process for obtaining, transferring, or surrendering a Federal Energy Regulatory Commission (FERC) hydropower license or exemption from licensing can be a series of complex negotiations. In many instances, the process may include stakeholders with different and/or competing perspectives or objectives related to the original license, new license (i.e., relicense), transfer of a license, or surrender of a license. Divergent perspectives and objectives can lead to disputes among project participants, which may impact the development of FERC license terms and conditions. One mechanism to resolve disputes between project participants involving a FERC authorization is informal and formal settlement agreement conferences,more » which often result in settlement agreements addressing the disputed issues. This report provides hydropower stakeholders with a better understanding of the FERC settlement agreement process, including information on: How to initiate a settlement agreement. The procedural steps associated with the settlement agreement process. The legal standards the Commission must adhere to when determining whether settlement agreement provisions can become lawful and enforceable terms or conditions of a FERC authorization. Examples of settlement agreement provisions included as license terms and conditions or in off-license agreements from a collection of settlement agreements and Commission orders.« less

  12. 10 CFR 32.22 - Self-luminous products containing tritium, krypton-85 or promethium-147: Requirements for license...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... promethium-147: Requirements for license to manufacture, process, produce, or initially transfer. 32.22 Section 32.22 Energy NUCLEAR REGULATORY COMMISSION SPECIFIC DOMESTIC LICENSES TO MANUFACTURE OR TRANSFER... containing tritium, krypton-85 or promethium-147: Requirements for license to manufacture, process, produce...

  13. 10 CFR 52.110 - Termination of license.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... any new information or significant environmental change associated with the licensee's proposed... reasons for concluding that the environmental impacts associated with site-specific decommissioning activities will be bounded by appropriate previously issued environmental impact statements. (2) The NRC...

  14. 47 CFR 22.949 - Unserved area licensing process.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Unserved area licensing process. 22.949 Section 22.949 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES PUBLIC MOBILE SERVICES Cellular Radiotelephone Service § 22.949 Unserved area licensing process. This section...

  15. 10 CFR 51.12 - Application of subpart to ongoing environmental work.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Application of subpart to ongoing environmental work. 51.12 Section 51.12 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act...

  16. 10 CFR 51.94 - Requirement to consider final environmental impact statement.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Requirement to consider final environmental impact statement. 51.94 Section 51.94 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act...

  17. 10 CFR 51.118 - Final environmental impact statement-notice of availability.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Final environmental impact statement-notice of availability. 51.118 Section 51.118 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act...

  18. 10 CFR 51.12 - Application of subpart to ongoing environmental work.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Application of subpart to ongoing environmental work. 51.12 Section 51.12 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act...

  19. 10 CFR 51.120 - Availability of environmental documents for public inspection.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Availability of environmental documents for public inspection. 51.120 Section 51.120 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act...

  20. 10 CFR 51.120 - Availability of environmental documents for public inspection.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Availability of environmental documents for public inspection. 51.120 Section 51.120 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act...

  1. Licensing of future mobile satellite systems

    NASA Technical Reports Server (NTRS)

    Lepkowski, Ronald J.

    1990-01-01

    The regulatory process for licensing mobile satellite systems is complex and can require many years to complete. This process involves frequency allocations, national licensing, and frequency coordination. The regulatory process that resulted in the establishment of the radiodetermination satellite service (RDSS) between 1983 and 1987 is described. In contrast, each of these steps in the licensing of the mobile satellite service (MSS) is taking a significantly longer period of time to complete.

  2. 10 CFR 60.23 - Elimination of repetition.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Elimination of repetition. 60.23 Section 60.23 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses License Applications § 60.23 Elimination of repetition. In its application, environmental...

  3. 10 CFR 51.103 - Record of decision-general.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... were included in the range of alternatives discussed in the environmental impact statement, and specify... preferences among alternatives based on relevant factors, including economic and technical considerations... impacts of license renewal are so great that preserving the option of license renewal for energy planning...

  4. Making Child Care Centers SAFER: A Non-Regulatory Approach to Improving Child Care Center Siting

    PubMed Central

    Somers, Tarah S; Harvey, Margaret L.; Rusnak, Sharee Major

    2011-01-01

    Licensed child care centers are generally considered to be safe because they are required to meet state licensing regulations. As part of their licensing requirements, many states inspect child care centers and include an assessment of the health and safety of the facility to look for hazardous conditions or practices that may harm children. However, most states do not require an environmental assessment of the child care center building or land to prevent a center from being placed on, next to, or inside contaminated buildings. Having worked on several sites where child care centers were affected by environmental contaminants, the Centers for Disease Control and Prevention and the Agency for Toxic Substances and Disease Registry (ATSDR) endeavor to raise awareness of this issue. One of ATSDR's partner states, Connecticut, took a proactive, non-regulatory approach to the issue with the development its Child Day Care Screening Assessment for Environmental Risk Program. PMID:21563710

  5. Sensor network based vehicle classification and license plate identification system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Frigo, Janette Rose; Brennan, Sean M; Rosten, Edward J

    Typically, for energy efficiency and scalability purposes, sensor networks have been used in the context of environmental and traffic monitoring applications in which operations at the sensor level are not computationally intensive. But increasingly, sensor network applications require data and compute intensive sensors such video cameras and microphones. In this paper, we describe the design and implementation of two such systems: a vehicle classifier based on acoustic signals and a license plate identification system using a camera. The systems are implemented in an energy-efficient manner to the extent possible using commercially available hardware, the Mica motes and the Stargate platform.more » Our experience in designing these systems leads us to consider an alternate more flexible, modular, low-power mote architecture that uses a combination of FPGAs, specialized embedded processing units and sensor data acquisition systems.« less

  6. 10 CFR 51.99 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false [Reserved] 51.99 Section 51.99 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act-Regulations Implementing Section 102(2) Final Environmental...

  7. 10 CFR 51.99 - [Reserved

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false [Reserved] 51.99 Section 51.99 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act-Regulations Implementing Section 102(2) Final Environmental...

  8. 77 FR 28316 - Filing a Renewed License Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-14

    ... only those environmental impacts and alternatives that are reasonably foreseeable. This means that... action timeframe. With respect to assessing the potential future environmental impacts associated with... its consideration of impacts in the generic and supplemental environmental impact statements (SEISs...

  9. 10 CFR 32.22 - Self-luminous products containing tritium, krypton-85 or promethium-147: Requirements for license...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... promethium-147: Requirements for license to manufacture, process, produce, or initially transfer. 32.22 Section 32.22 Energy NUCLEAR REGULATORY COMMISSION SPECIFIC DOMESTIC LICENSES TO MANUFACTURE OR TRANSFER..., or initially transfer. (a) An application for a specific license to manufacture, process, or produce...

  10. 77 FR 71587 - Wisconsin Public Service Corporation; Notices of Intent To File License Applications, Filing of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-03

    ...] Wisconsin Public Service Corporation; Notices of Intent To File License Applications, Filing of Pre-Application Documents (PAD), Commencement of Pre-Filing Processes and Scoping, Request for Comments on the...: Notices of Intent to File License Applications for Two New Licenses and Commencing the Pre-filing Process...

  11. Community attitudes towards environmental tobacco smoke in licensed premises: follow-up study after the Sharp case.

    PubMed

    Tzelepis, Flora; Walsh, Raoul A; Paul, Christine L

    2003-10-01

    To examine community attitudes towards environmental tobacco smoke in licensed premises after the Sharp case decision. 723 randomly selected New South Wales residents aged 18 years and over completed a telephone survey in November 2001. The vast majority supported some form of smoking restriction in licensed clubs (92.1%) and hotels (90.0%). Compared with a 2000 survey, respondents in the 2001 survey were significantly more likely to support a total smoking ban in licensed clubs and hotels. When support was assessed using a ban-only question, 66.8% supported banning smoking in pubs/clubs. Approximately half reported being less likely to visit non-eating areas of licensed clubs (51.2%) and hotels (49.8%) if smoking were permitted and these proportions were significantly higher than in the 2000 survey. A majority (83.1%) thought bar workers' health should be a major consideration when deciding how to handle smoking in pubs/clubs. More than half (56.8%) believed pubs/clubs would experience significant financial problems if smoking bans were introduced. In New South Wales, majority support exists for banning smoking in pubs and clubs. Legislation banning smoking in all indoor drinking and gaming areas should be introduced immediately.

  12. 15 CFR 970.211 - Consultation and cooperation with Federal agencies.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES... Administrator will distribute a copy of the application to each other Federal agency or department which..., recommend certification of the application, issuance or transfer of the license, or denial of such...

  13. 15 CFR 970.211 - Consultation and cooperation with Federal agencies.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES... Administrator will distribute a copy of the application to each other Federal agency or department which..., recommend certification of the application, issuance or transfer of the license, or denial of such...

  14. 15 CFR 970.603 - Conservation of resources.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Resource Development Concepts § 970.603 Conservation of resources. (a) With respect to the exploration phase of seabed mining, the... provisions only as the Administrator deems necessary. (b) NOAA views license phase mining system tests as an...

  15. 15 CFR 970.603 - Conservation of resources.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Resource Development Concepts § 970.603 Conservation of resources. (a) With respect to the exploration phase of seabed mining, the... provisions only as the Administrator deems necessary. (b) NOAA views license phase mining system tests as an...

  16. 15 CFR 970.603 - Conservation of resources.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Resource Development Concepts § 970.603 Conservation of resources. (a) With respect to the exploration phase of seabed mining, the... provisions only as the Administrator deems necessary. (b) NOAA views license phase mining system tests as an...

  17. 10 CFR 30.33 - General requirements for issuance of specific licenses.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false General requirements for issuance of specific licenses. 30.33 Section 30.33 Energy NUCLEAR REGULATORY COMMISSION RULES OF GENERAL APPLICABILITY TO DOMESTIC... other benefits against environmental costs and considering available alternatives, that the action...

  18. 10 CFR 30.33 - General requirements for issuance of specific licenses.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false General requirements for issuance of specific licenses. 30.33 Section 30.33 Energy NUCLEAR REGULATORY COMMISSION RULES OF GENERAL APPLICABILITY TO DOMESTIC... other benefits against environmental costs and considering available alternatives, that the action...

  19. 15 CFR 970.603 - Conservation of resources.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Resource Development Concepts § 970.603 Conservation of resources. (a) With respect to the exploration phase of seabed mining, the... provisions only as the Administrator deems necessary. (b) NOAA views license phase mining system tests as an...

  20. 15 CFR 970.603 - Conservation of resources.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Resource Development Concepts § 970.603 Conservation of resources. (a) With respect to the exploration phase of seabed mining, the... provisions only as the Administrator deems necessary. (b) NOAA views license phase mining system tests as an...

  1. 10 CFR 72.34 - Environmental report.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Environmental report. 72.34 Section 72.34 Energy NUCLEAR..., and Contents § 72.34 Environmental report. Each application for an ISFSI or MRS license under this part must be accompanied by an Environmental Report which meets the requirements of subpart A of part...

  2. 75 FR 8753 - Carolina Power & Light Company, Brunswick Steam Electric Plant, Units 1 and 2; Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-25

    ... Dusenbury of the North Carolina Department of Environment and Natural Resources regarding the environmental... & Light Company, Brunswick Steam Electric Plant, Units 1 and 2; Environmental Assessment and Finding of No... identification of licensing and regulatory actions requiring environmental assessments,'' the NRC prepared an...

  3. 77 FR 74181 - Inside Passage Electric Cooperative; Alaska; Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-13

    ... Electric Cooperative; Alaska; Notice of Availability of Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's (Commission's or... staff's analysis of the potential environmental impacts of the project and concludes that licensing the...

  4. Licensing Process | NREL

    Science.gov Websites

    Agreement After the company and NREL agree on license financial terms, NREL will draft a license agreement Group Licensing Guide and Sample License. 4. Negotiate License Language After a draft agreement has been created, NREL can tailor many of the license provisions to ensure an agreement that works for all parties

  5. 15 CFR 970.601 - Logical mining unit.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Resource Development Concepts § 970.601 Logical mining unit. (a) In the case of an exploration license, a logical mining unit is an... 15 Commerce and Foreign Trade 3 2014-01-01 2014-01-01 false Logical mining unit. 970.601 Section...

  6. 15 CFR 970.601 - Logical mining unit.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Resource Development Concepts § 970.601 Logical mining unit. (a) In the case of an exploration license, a logical mining unit is an... 15 Commerce and Foreign Trade 3 2013-01-01 2013-01-01 false Logical mining unit. 970.601 Section...

  7. 15 CFR 970.601 - Logical mining unit.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Resource Development Concepts § 970.601 Logical mining unit. (a) In the case of an exploration license, a logical mining unit is an... 15 Commerce and Foreign Trade 3 2012-01-01 2012-01-01 false Logical mining unit. 970.601 Section...

  8. 15 CFR 960.8 - Notification of foreign agreements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... THE ENVIRONMENTAL DATA SERVICE LICENSING OF PRIVATE REMOTE SENSING SYSTEMS Licenses § 960.8... Secretary; (2) The obligations of the licensee to provide access to data for the National Satellite Land Remote Sensing Data Archive; and (3) The obligations of the licensee to convey to the foreign party the...

  9. 15 CFR 960.8 - Notification of foreign agreements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... THE ENVIRONMENTAL DATA SERVICE LICENSING OF PRIVATE REMOTE SENSING SYSTEMS Licenses § 960.8... Secretary; (2) The obligations of the licensee to provide access to data for the National Satellite Land Remote Sensing Data Archive; and (3) The obligations of the licensee to convey to the foreign party the...

  10. 15 CFR 960.8 - Notification of foreign agreements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... THE ENVIRONMENTAL DATA SERVICE LICENSING OF PRIVATE REMOTE SENSING SYSTEMS Licenses § 960.8... Secretary; (2) The obligations of the licensee to provide access to data for the National Satellite Land Remote Sensing Data Archive; and (3) The obligations of the licensee to convey to the foreign party the...

  11. 15 CFR 960.8 - Notification of foreign agreements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... THE ENVIRONMENTAL DATA SERVICE LICENSING OF PRIVATE REMOTE SENSING SYSTEMS Licenses § 960.8... Secretary; (2) The obligations of the licensee to provide access to data for the National Satellite Land Remote Sensing Data Archive; and (3) The obligations of the licensee to convey to the foreign party the...

  12. 10 CFR 51.53 - Postconstruction environmental reports.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... renewal of a license to operate a nuclear power plant under part 54 of this chapter shall submit with its... for a nuclear power reactor shall submit this report only in connection with the first licensing action authorizing full-power operation. In this report, the applicant shall discuss the same matters...

  13. 76 FR 60557 - Environmental Assessment and Finding of No Significant Impact for a License Amendment to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-29

    ... Electric Company, LLC, Hematite Decommissioning Project, Hematite, MO AGENCY: Nuclear Regulatory Commission... (SNM) License number SNM-33, issued to Westinghouse Electric Company, LLC (WEC) to authorize... radioactively contaminated material by rail car to an offsite facility located in Idaho was also confirmed in...

  14. Lead, Allergen, and Pesticide Levels in Licensed Child Care Centers in the United States

    EPA Science Inventory

    The First National Environmental Health Survey of Child Care Centers was conducted to provide information about lead, allergens, and pesticide levels in licensed U.S. child care centers. Lead levels were measured in settled dust, paint, and play area soil; indoor allergen levels ...

  15. 10 CFR 30.33 - General requirements for issuance of specific licenses.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false General requirements for issuance of specific licenses. 30.33 Section 30.33 Energy NUCLEAR REGULATORY COMMISSION RULES OF GENERAL APPLICABILITY TO DOMESTIC..., and other benefits against environmental costs and considering available alternatives, that the action...

  16. 10 CFR 30.33 - General requirements for issuance of specific licenses.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false General requirements for issuance of specific licenses. 30.33 Section 30.33 Energy NUCLEAR REGULATORY COMMISSION RULES OF GENERAL APPLICABILITY TO DOMESTIC... benefits against environmental costs and considering available alternatives, that the action called for is...

  17. 15 CFR 960.6 - Review procedures for license applications.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Review procedures for license applications. 960.6 Section 960.6 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued) NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE...

  18. 15 CFR 970.601 - Logical mining unit.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Resource Development Concepts § 970.601 Logical mining unit. (a) In the case of an exploration license, a logical mining unit is an... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Logical mining unit. 970.601 Section...

  19. 15 CFR 970.601 - Logical mining unit.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Resource Development Concepts § 970.601 Logical mining unit. (a) In the case of an exploration license, a logical mining unit is an... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Logical mining unit. 970.601 Section...

  20. 10 CFR 51.105a - Public hearings in proceedings for issuance of manufacturing licenses.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... should be issued as proposed by the NRC's Director, Office of New Reactors or Director, Office of Nuclear Reactor Regulation, as appropriate. [73 FR 5724, Jan. 31, 2008] ... manufacturing licenses. 51.105a Section 51.105a Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL...

  1. 10 CFR 51.105a - Public hearings in proceedings for issuance of manufacturing licenses.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... should be issued as proposed by the NRC's Director, Office of New Reactors or Director, Office of Nuclear Reactor Regulation, as appropriate. [73 FR 5724, Jan. 31, 2008] ... manufacturing licenses. 51.105a Section 51.105a Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL...

  2. 10 CFR 51.105a - Public hearings in proceedings for issuance of manufacturing licenses.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... should be issued as proposed by the NRC's Director, Office of New Reactors or Director, Office of Nuclear Reactor Regulation, as appropriate. [73 FR 5724, Jan. 31, 2008] ... manufacturing licenses. 51.105a Section 51.105a Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL...

  3. 10 CFR 51.105a - Public hearings in proceedings for issuance of manufacturing licenses.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... should be issued as proposed by the NRC's Director, Office of New Reactors or Director, Office of Nuclear Reactor Regulation, as appropriate. [73 FR 5724, Jan. 31, 2008] ... manufacturing licenses. 51.105a Section 51.105a Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL...

  4. 10 CFR 51.105a - Public hearings in proceedings for issuance of manufacturing licenses.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... should be issued as proposed by the NRC's Director, Office of New Reactors or Director, Office of Nuclear Reactor Regulation, as appropriate. [73 FR 5724, Jan. 31, 2008] ... manufacturing licenses. 51.105a Section 51.105a Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL...

  5. Enhancement of Capabilities in Hyperspectral and Radar Remote Sensing for Environmental Assessment and Monitoring

    NASA Technical Reports Server (NTRS)

    Hepner, George F.

    1999-01-01

    The University of Utah, Department of Geography has developed a research and instructional program in satellite remote sensing and image processing. The University requested funds for the purchase of software licenses, mass storage for massive hyperspectral imager data sets, upgrades for the central data server to handle the additional storage capacity, a spectroradiometer for field data collection. These purchases have been made. This equipment will support research in one of the newest and most rapidly expanding areas of remote sensing.

  6. 78 FR 50052 - Chief of Engineers Environmental Advisory Board; Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-16

    ... environmentally sustainable manner. Discussions and presentations during this meeting will include flow management...., drivers license, state- issued photo ID, or passport), and pass through the security screening station...

  7. 15 CFR 970.518 - Environmental protection requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Issuance... Secretary of State and the Secretary of the department in which the Coast Guard is operating. He also will...

  8. Public Participation Planning of Environmental Impact Assessment (EIA) and Regulations: Analysis of Inconsistency for Some Cases in Indonesia

    NASA Astrophysics Data System (ADS)

    Hindrayani, Aniek; Purwanto

    2018-02-01

    The failure in community involvement during the environmental documents planning may result in the failure of the planned project implementation. This study aims to determine the gap between practices and regulations that apply to the process of community involvement in the environmental documents planning, and find out inconsistency of implementation on each stakeholder in the planning of the Environmental Impact Assessment (EIA) and the environmental permit. The method used was qualitative through interview and literature study which is analyzed using triangulation model and presented in the form of concept map. The results of the study indicate that 1) the determination of community representatives based on the criteria of the impacted communities is not clearly described, 3) suggestions, opinions, and responses to the environmental impact management are not well implemented by the project proponent, 3) implementation of the environmental management of other licensed activities affecting the behavior (4) stakeholders (project proponent, EIA consultants, and EIA appraisal committee) do not play their role as mandated in applicable legislation.

  9. 10 CFR 51.75 - Draft environmental impact statement-construction permit, early site permit, or combined licesne.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... required. 5 The impact statement shall take account of dose commitments and health effects from fuel cycle... the site proposed. The draft environmental impact statement must not include an assessment of the... certification environmental assessment, then the draft combined license environmental impact statement shall...

  10. 75 FR 57820 - Luminant Generation Company, LLC.; Combined License Application for Comanche Peak Nuclear Power...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-22

    ...; Environmental Assessment and Finding of No Significant Impact The U.S. Nuclear Regulatory Commission (NRC) is... NRC is issuing this environmental assessment and finding of no significant impact. Environmental.... Environmental Impacts of the Proposed Action The NRC has completed its evaluation of the proposed action and...

  11. 10 CFR 51.109 - Public hearings in proceedings for issuance of materials license with respect to a geologic...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... whether it is practicable to adopt, without further supplementation, the environmental impact statement... supplementation of the environmental impact statement by NRC is required, it shall file its final supplemental environmental impact statement with the Environmental Protection Agency, furnish that statement to commenting...

  12. 75 FR 27372 - University of New Mexico; University of New Mexico AGN-201M Reactor; Environmental Assessment and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-14

    ... is housed in the Nuclear Energy Laboratory (NEL) located near the southwest corner of the University.... Therefore, license renewal should not change the environmental impact of facility operation. Data from the... analysis of human health and environmental impacts presented in this environmental assessment, the proposed...

  13. 40 CFR 51.850 - Prohibition.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... engage in, support in any way or provide financial assistance for, license or permit, or approve any... Federal actions where either: (1) A National Environmental Policy Act (NEPA) analysis was completed as evidenced by a final environmental assessment (EA), environmental impact statement (EIS), or finding of no...

  14. 10 CFR 51.61 - Environmental report-independent spent fuel storage installation (ISFSI) or monitored retrievable...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act-Regulations Implementing Section 102(2... Control Desk, Director, Office of Nuclear Material Safety and Safeguards, a separate document entitled...

  15. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Klise, Katherine A.; Siirola, John Daniel; Hart, David

    The Water Security Toolkit (WST) is a suite of open source software tools that can be used by water utilities to create response strategies to reduce the impact of contamination in a water distribution network . WST includes hydraulic and water quality modeling software , optimizati on methodologies , and visualization tools to identify: (1) sensor locations to detect contamination, (2) locations in the network in which the contamination was introduced, (3) hydrants to remove contaminated water from the distribution system, (4) locations in the network to inject decontamination agents to inactivate, remove, or destroy contaminants, (5) locations in themore » network to take grab sample s to help identify the source of contamination and (6) valves to close in order to isolate contaminate d areas of the network. This user manual describes the different components of WST , along w ith examples and case studies. License Notice The Water Security Toolkit (WST) v.1.2 Copyright c 2012 Sandia Corporation. Under the terms of Contract DE-AC04-94AL85000, there is a non-exclusive license for use of this work by or on behalf of the U.S. government. This software is distributed under the Revised BSD License (see below). In addition, WST leverages a variety of third-party software packages, which have separate licensing policies: Acro Revised BSD License argparse Python Software Foundation License Boost Boost Software License Coopr Revised BSD License Coverage BSD License Distribute Python Software Foundation License / Zope Public License EPANET Public Domain EPANET-ERD Revised BSD License EPANET-MSX GNU Lesser General Public License (LGPL) v.3 gcovr Revised BSD License GRASP AT&T Commercial License for noncommercial use; includes randomsample and sideconstraints executable files LZMA SDK Public Domain nose GNU Lesser General Public License (LGPL) v.2.1 ordereddict MIT License pip MIT License PLY BSD License PyEPANET Revised BSD License Pyro MIT License PyUtilib Revised BSD License PyYAML MIT License runpy2 Python Software Foundation License setuptools Python Software Foundation License / Zope Public License six MIT License TinyXML zlib License unittest2 BSD License Utilib Revised BSD License virtualenv MIT License Vol Common Public License vpykit Revised BSD License Additionally, some precompiled WST binary distributions might bundle other third-party executables files: Coliny Revised BSD License (part of Acro project) Dakota GNU Lesser General Public License (LGPL) v.2.1 PICO Revised BSD License (part of Acro project) i Revised BSD License Redistribution and use in source and binary forms, with or without modification, are permitted provided that the following conditions are met: * Redistributions of source code must retain the above copyright notice, this list of conditions and the following disclaimer. * Redistributions in binary form must reproduce the above copyright notice, this list of conditions and the following disclaimer in the documentation and/or other materials provided with the distribution. * Neither the name of Sandia National Laboratories nor Sandia Corporation nor the names of its con- tributors may be used to endorse or promote products derived from this software without specific prior written permission. THIS SOFTWARE IS PROVIDED BY THE COPYRIGHT HOLDERS AND CONTRIBUTORS "AS IS" AND ANY EXPRESS OR IMPLIED WARRANTIES, INCLUDING, BUT NOT LIMITED TO, THE IM- PLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE DISCLAIMED. IN NO EVENT SHALL SANDIA CORPORATION BE LIABLE FOR ANY DIRECT, INDIRECT, INCIDENTAL, SPECIAL, EXEMPLARY, OR CONSEQUENTIAL DAMAGES (INCLUD- ING, BUT NOT LIMITED TO, PROCUREMENT OF SUBSTITUTE GOODS OR SERVICES; LOSS OF USE, DATA, OR PROFITS; OR BUSINESS INTERRUPTION) HOWEVER CAUSED AND ON ANY THEORY OF LIABILITY, WHETHER IN CONTRACT, STRICT LIABILITY, OR TORT (INCLUDING NEGLIGENCE OR OTHERWISE) ARISING IN ANY WAY OUT OF THE USE OF THIS SOFTWARE, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGE. ii Acknowledgements This work was supported by the U.S. Environmental Protection Agency through its Office of Research and Development (Interagency Agreement # DW8992192801). The material in this document has been subject to technical and policy review by the U.S. EPA, and approved for publication. The views expressed by individual authors, however, are their own, and do not necessarily reflect those of the U.S. Environmental Protection Agency. Mention of trade names, products, or services does not convey official U.S. EPA approval, endorsement, or recommendation. The Water Security Toolkit is an extension of the Threat Ensemble Vulnerability Assessment-Sensor Place- ment Optimization Tool (TEVA-SPOT), which was also developed with funding from the U.S. Environ- mental Protection Agency through its Office of Research and Development (Interagency Agreement # DW8992192801). The authors acknowledge the following individuals for their contributions to the devel- opment of TEVA-SPOT: Jonathan Berry (Sandia National Laboratories), Erik Boman (Sandia National Laboratories), Lee Ann Riesen (Sandia National Laboratories), James Uber (University of Cincinnati), and Jean-Paul Watson (Sandia National Laboratories). iii Acronyms ATUS American Time-Use Survey BLAS Basic linear algebra sub-routines CFU Colony-forming unit CVAR Conditional value at risk CWS Contamination warning system EA Evolutionary algorithm EDS Event detection system EPA U.S. Environmental Protection Agency EC Extent of Contamination ERD EPANET results database file GLPK GNU Linear Programming Kit GRASP Greedy randomized adaptive sampling process HEX Hexadecimal HTML HyperText markup language INP EPANET input file LP Linear program MC Mass consumed MILP Mixed integer linear program MIP Mixed integer program MSX Multi-species extension for EPANET NFD Number of failed detections NS Number of sensors NZD Non-zero demand PD Population dosed PE Population exposed PK Population killed TAI Threat assessment input file TCE Tailed-conditioned expectation TD Time to detection TEC Timed extent of contamination TEVA Threat ensemble vulnerability assessment TSB Tryptic soy broth TSG Threat scenario generation file TSI Threat simulation input file VAR Value at risk VC Volume consumed WST Water Security Toolkit YML YAML configuration file format for WST iv Symbols Notation Definition Example { , } set brackets { 1,2,3 } means a set containing the values 1,2, and 3. [?] is an element of s [?] S means that s is an element of the set S . [?] for all s = 1 [?] s [?] S means that the statement s = 1 is true for all s in set S . P summation P n i =1 s i means s 1 + s 2 + * * * + s n . \\ set minus S \\ T means the set that contains all those elements of S that are not in set T . %7C given %7C is used to define conditional probability. P ( s %7C t ) means the prob- ability of s occurring given that t occurs. %7C ... %7C cardinality Cardinality of a set is the number of elements of the set. If set S = { 2,4,6 } , then %7C S %7C = 3. v« less

  16. 75 FR 77624 - Intent To Grant an Exclusive License for U.S. Army Owned Inventions to Polymer Processing Institute

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-13

    ... DEPARTMENT OF DEFENSE Department of the Army Intent To Grant an Exclusive License for U.S. Army Owned Inventions to Polymer Processing Institute AGENCY: Department of the Army, DoD. ACTION: Notice... contemplates granting an exclusive license to Polymer Processing Institute, a not-for-profit corporation having...

  17. 78 FR 26813 - Request To Amend a License To Import Radioactive Waste

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-08

    ... NUCLEAR REGULATORY COMMISSION Request To Amend a License To Import Radioactive Waste Pursuant to..., 2013, April 23, material (Class to a maximum the licensee name 2013, IW022/03, 11005700. A radioactive total of 5,500 from ``Perma-Fix waste). tons of low- Environmental level waste). Services, Inc.'' to...

  18. 15 CFR Appendix 1 to Part 960 - Filing Instructions and Information To Be Included in the Licensing Application

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE LICENSING OF PRIVATE REMOTE... and Information Service (NESDIS), NOAA, Department of Commerce, 1335 East West Highway, Silver Spring... applicant's total indebtedness; (ix) A person upon who service of all documents may be made. (2) A...

  19. 15 CFR Appendix 1 to Part 960 - Filing Instructions and Information To Be Included in the Licensing Application

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE LICENSING OF PRIVATE REMOTE... and Information Service (NESDIS), NOAA, Department of Commerce, 1335 East West Highway, Silver Spring... applicant's total indebtedness; (ix) A person upon who service of all documents may be made. (2) A...

  20. 10 CFR 51.106 - Public hearings in proceedings for issuance of operating licenses.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... concerning need for power or alternative energy sources or alternative sites for the facility for which an... 10 Energy 2 2013-01-01 2013-01-01 false Public hearings in proceedings for issuance of operating licenses. 51.106 Section 51.106 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION...

  1. 10 CFR 51.106 - Public hearings in proceedings for issuance of operating licenses.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... concerning need for power or alternative energy sources or alternative sites for the facility for which an... 10 Energy 2 2011-01-01 2011-01-01 false Public hearings in proceedings for issuance of operating licenses. 51.106 Section 51.106 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION...

  2. 10 CFR 51.106 - Public hearings in proceedings for issuance of operating licenses.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... concerning need for power or alternative energy sources or alternative sites for the facility for which an... 10 Energy 2 2014-01-01 2014-01-01 false Public hearings in proceedings for issuance of operating licenses. 51.106 Section 51.106 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION...

  3. 10 CFR 51.106 - Public hearings in proceedings for issuance of operating licenses.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... concerning need for power or alternative energy sources or alternative sites for the facility for which an... 10 Energy 2 2012-01-01 2012-01-01 false Public hearings in proceedings for issuance of operating licenses. 51.106 Section 51.106 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION...

  4. 10 CFR 51.106 - Public hearings in proceedings for issuance of operating licenses.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... concerning need for power or alternative energy sources or alternative sites for the facility for which an... 10 Energy 2 2010-01-01 2010-01-01 false Public hearings in proceedings for issuance of operating licenses. 51.106 Section 51.106 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION...

  5. 15 CFR 970.513 - Revision of a license.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Issuance/Transfer/Terms... application, some details may have to be provided in the future in the form of a revision. In such instances... Administrator as a revision is a major change in one or more of: (1) The bases for certifying the original...

  6. 77 FR 76078 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-26

    ... Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants, and Nuclear Energy... 10 CFR 51.22. Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or... cyber security controls only. The operational and management controls, as described in Nuclear Energy...

  7. 10 CFR 51.95 - Postconstruction environmental impact statements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... determined by the Commission, a supplement on the operation of a nuclear power plant will not include a... the storage of spent fuel for the nuclear power plant within the scope of the generic determination in... the renewal of an operating license or combined license for a nuclear power plant under parts 52 or 54...

  8. 10 CFR 51.104 - NRC proceeding using public hearings; consideration of environmental impact statement.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false NRC proceeding using public hearings; consideration of environmental impact statement. 51.104 Section 51.104 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National...

  9. 10 CFR 51.53 - Postconstruction environmental reports.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... renewal of a license to operate a nuclear power plant under part 54 of this chapter shall submit with its... related to the environmental effects of the proposed action and the alternatives. In addition, the... impact statement; supplements to the final environmental impact statement, including supplements prepared...

  10. 10 CFR 51.61 - Environmental report-independent spent fuel storage installation (ISFSI) or monitored retrievable...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... either an environmental impact statement or an environmental assessment, as appropriate. The... factors contained in subpart E of part 72 of this chapter. Unless otherwise required by the Commission, in... the environmental impact of the storage of spent fuel at an ISFSI beyond the term of the license or...

  11. 76 FR 59174 - Environmental Assessment and Finding of No Significant Impact for the N.S. Savannah; License NS-1...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-23

    ... Regulatory Commission. ACTION: Environmental assessment and finding of no significant impact. FOR FURTHER... require either an EA or an environmental impact statement. This EA was prepared for the part of the... decommissioning activities. Environmental Impacts of the Proposed Action The NRC has completed its evaluation of...

  12. Environmental Factors Associated With Social Participation of Older Adults Living in Metropolitan, Urban, and Rural Areas: The NuAge Study

    PubMed Central

    Cohen, Alan A.; Dubois, Marie-France; Généreux, Mélissa; Richard, Lucie; Therrien, France-Hélène; Payette, Hélène

    2015-01-01

    Objectives. We compared the social participation of older adults living in metropolitan, urban, and rural areas, and identified associated environmental factors. Methods. From 2004 to 2006, we conducted a cross-sectional study using an age-, gender-, and area-stratified random sample of 1198 adults (aged 67–82 years). We collected data via interviewer-administered questionnaires and derived from Canadian censuses. Results. Social participation did not differ across living areas (P = .09), but after controlling for potential confounding variables, we identified associated area-specific environmental variables. In metropolitan areas, higher social participation was associated with greater proximity to neighborhood resources, having a driver’s license, transit use, and better quality social network (R2 = 0.18). In urban areas, higher social participation was associated with greater proximity to neighborhood resources and having a driver’s license (R2 = 0.11). Finally, in rural areas, higher social participation was associated with greater accessibility to key resources, having a driver’s license, children living in the neighborhood, and more years lived in the current dwelling (R2 = 0.18). Conclusions. To enhance social participation of older adults, public health interventions need to address different environmental factors according to living areas. PMID:25689194

  13. 10 CFR 70.62 - Safety program and integrated safety analysis.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...) Radiological hazards related to possessing or processing licensed material at its facility; (ii) Chemical hazards of licensed material and hazardous chemicals produced from licensed material; (iii) Facility... performed by a team with expertise in engineering and process operations. The team shall include at least...

  14. 15 CFR 970.702 - Monitoring and mitigation of environmental effects.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 15 Commerce and Foreign Trade 3 2012-01-01 2012-01-01 false Monitoring and mitigation of... Environmental Effects § 970.702 Monitoring and mitigation of environmental effects. (a) Monitoring. If an... monitoring plan as part of the terms, conditions and restrictions developed for each license. The plan will...

  15. 15 CFR 970.702 - Monitoring and mitigation of environmental effects.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 15 Commerce and Foreign Trade 3 2014-01-01 2014-01-01 false Monitoring and mitigation of... Environmental Effects § 970.702 Monitoring and mitigation of environmental effects. (a) Monitoring. If an... monitoring plan as part of the terms, conditions and restrictions developed for each license. The plan will...

  16. 15 CFR 970.702 - Monitoring and mitigation of environmental effects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Monitoring and mitigation of... Environmental Effects § 970.702 Monitoring and mitigation of environmental effects. (a) Monitoring. If an... monitoring plan as part of the terms, conditions and restrictions developed for each license. The plan will...

  17. 15 CFR 970.702 - Monitoring and mitigation of environmental effects.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 15 Commerce and Foreign Trade 3 2013-01-01 2013-01-01 false Monitoring and mitigation of... Environmental Effects § 970.702 Monitoring and mitigation of environmental effects. (a) Monitoring. If an... monitoring plan as part of the terms, conditions and restrictions developed for each license. The plan will...

  18. 15 CFR 970.702 - Monitoring and mitigation of environmental effects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Monitoring and mitigation of... Environmental Effects § 970.702 Monitoring and mitigation of environmental effects. (a) Monitoring. If an... monitoring plan as part of the terms, conditions and restrictions developed for each license. The plan will...

  19. 10 CFR 51.108 - Public hearings on Commission findings that inspections, tests, analyses, and acceptance criteria...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... CFR 52.103(b), the Commission will not admit any contentions on environmental issues, the adequacy of... NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act-Regulations Implementing Section 102(2...

  20. 10 CFR 51.58 - Environmental report-number of copies; distribution.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Environmental report-number of copies; distribution. 51.58 Section 51.58 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR...)(4), each applicant for renewal of an operating or combined license for a nuclear power plant, each...

  1. 10 CFR 51.45 - Environmental report.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Environmental report. 51.45 Section 51.45 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED... amended at 61 FR 28486, June 5, 1996; 61 FR 66542, Dec. 18, 1996; 68 FR 58810, Oct. 10, 2003; 72 FR 49511...

  2. 10 CFR 51.92 - Supplement to the final environmental impact statement.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Supplement to the final environmental impact statement. 51.92 Section 51.92 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION... or its impacts. (b) In a proceeding for a combined license application under 10 CFR part 52...

  3. 10 CFR 51.58 - Environmental report-number of copies; distribution.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Environmental report-number of copies; distribution. 51.58 Section 51.58 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR...)(4), each applicant for renewal of an operating or combined license for a nuclear power plant, each...

  4. 10 CFR 51.58 - Environmental report-number of copies; distribution.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Environmental report-number of copies; distribution. 51.58 Section 51.58 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR...)(4), each applicant for renewal of an operating or combined license for a nuclear power plant, each...

  5. 10 CFR 51.58 - Environmental report-number of copies; distribution.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Environmental report-number of copies; distribution. 51.58 Section 51.58 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR...)(4), each applicant for renewal of an operating or combined license for a nuclear power plant, each...

  6. 10 CFR 51.58 - Environmental report-number of copies; distribution.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Environmental report-number of copies; distribution. 51.58 Section 51.58 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR...)(4), each applicant for renewal of an operating or combined license for a nuclear power plant, each...

  7. 10 CFR 51.30 - Environmental assessment.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND..., an environmental assessment will not include discussion of any aspect of the storage of spent fuel... for an MRS set forth in section 141(b)(1) of the Nuclear Waste Policy Act of 1982 (96 Stat. 2242, 42 U...

  8. 10 CFR 51.30 - Environmental assessment.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND..., an environmental assessment will not include discussion of any aspect of the storage of spent fuel... for an MRS set forth in section 141(b)(1) of the Nuclear Waste Policy Act of 1982 (96 Stat. 2242, 42 U...

  9. 10 CFR 51.30 - Environmental assessment.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND..., an environmental assessment will not include discussion of any aspect of the storage of spent fuel... for an MRS set forth in section 141(b)(1) of the Nuclear Waste Policy Act of 1982 (96 Stat. 2242, 42 U...

  10. 10 CFR 51.30 - Environmental assessment.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND..., an environmental assessment will not include discussion of any aspect of the storage of spent fuel... for an MRS set forth in section 141(b)(1) of the Nuclear Waste Policy Act of 1982 (96 Stat. 2242, 42 U...

  11. 76 FR 10805 - Dan Kane; Denial of Petition for Rulemaking

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-28

    ... of no significant environmental impact, also known as the Waste Confidence Rule. (ADAMS Accession No... safely and without significant environmental impacts for at least 60 years after the licensed life of... supported by an Environmental Impact Statement) to assess the long-term storage of SNF and HLW. (ADAMS...

  12. Hydropower Licensing as a Bridge between Climate Science and Applications: Creating Actionable Science for Regulatory Decisionmaking

    NASA Astrophysics Data System (ADS)

    Ray, A. J.; Barsugli, J. J.; Walker, S. H.

    2016-12-01

    The Integrated Licensing Process (ILP) of the US Federal Energy Regulatory Commission (FERC) is an example of an existing regulatory process that has the capacity to bridge the gap between science and decision making by clearly delineating existing science, the climate-regulatory nexus, and additional scientific work needed to inform licensing or relicensing of non-federal hydropower projects. In a parallel, but interacting set of legal and regulatory processes, NOAA's National Marine Fisheries Service (NMFS) must conduct analyses based on the best available science in order to implement the requirements of the Endangered Species Act (ESA), the Magnuson-Stevens Act, and NEPA, and to develop terms and conditions to protect fisheries for the 30-50 year term of the license and the longer life of the project itself. Therefore, NMFS must understand the combined effects of hydropower projects and climate change to fulfill its own mandates to protect anadromous fish, protected species and habitat. Federal Executive Order (EO) #13693 on climate change sustainability require use of climate risks in planning, also recommended in NOAA's own guidance on implementing ESA, and the Council on Environmental Quality (CEQ) guidance on implementing NEPA; however, as an independent agency FERC is not subject to that EO. In the past, FERC has consistently rejected NMFS' climate study requests, stating, among other reasons, that climate science is `too uncertain,' and therefore not actionable. Thus, in order for NMFS to get the information needed for its own decision process, NOAA must first persuade FERC that the science is actionable. This presentation will describe our experiences in a multi-year effort by an interdisciplinary team of climate and fishery scientists to develop acceptable climate study requests that address FERC's concerns about uncertainty, for the Susitna-Watana project on Alaska's Susitna River, the LaGrange Project on the Tuolumne R. in California, and the Hiram Project on the Saco R. in Maine. Furthermore, we document that climate studies are needed to meet FERC's own standard that study methodologies be "generally accepted practice" in the community, i.e., that water infrastructure planning and management has evolved to include use of climate risk assessments as best practices.

  13. 7 CFR 52.29 - Who may become licensed sampler.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... MARKETING ACT OF 1946 PROCESSED FRUITS AND VEGETABLES, PROCESSED PRODUCTS THEREOF, AND CERTAIN OTHER PROCESSED FOOD PRODUCTS 1 Regulations Governing Inspection and Certification Licensing of Samplers and...

  14. 30 CFR 285.618 - What must I do upon completion of approved site assessment activities?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... expiration of your site assessment term, you timely submit a COP meeting the requirements of this subpart, or... your COP for approval or FERC reviews your license application for approval. (b) You are not required... your approved COP or approved FERC license. (c) If, following the technical and environmental review of...

  15. 76 FR 24064 - Arizona Public Service Company, Palo Verde Nuclear Generating Station, Units 1, 2, and 3, Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-29

    ... Decision Notice is hereby given that the U.S. Nuclear Regulatory Commission (NRC, the Commission) has... notice also serves as the record of decision for Renewed Facility Operating License Nos. NPF-41, NPF-51... Decision--General.'' NUREG-1437, ``Generic Environmental Impact Statement for License Renewal of Nuclear...

  16. 15 CFR 960.12 - Data policy for remote sensing space systems.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Data policy for remote sensing space... REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE LICENSING OF PRIVATE REMOTE SENSING SYSTEMS Licenses § 960.12 Data policy for remote sensing space systems. (a) In accordance with the Act, if the U.S. Government...

  17. EPA-developed, patented technologies related to miscellaneous areas of environmental experties and invention that are available for licensing

    EPA Pesticide Factsheets

    Under the Federal Technology Transfer Act (FTTA), Federal Agencies can patent inventions developed during the course of research. These technologies can then be licensed to businesses or individuals for further development and sale in the marketplace. These technologies relate to ecological research, human health, and manufacturing.

  18. 15 CFR 960.12 - Data policy for remote sensing space systems.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Data policy for remote sensing space... REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE LICENSING OF PRIVATE REMOTE SENSING SYSTEMS Licenses § 960.12 Data policy for remote sensing space systems. (a) In accordance with the Act, if the U.S. Government...

  19. 15 CFR 960.12 - Data policy for remote sensing space systems.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 15 Commerce and Foreign Trade 3 2012-01-01 2012-01-01 false Data policy for remote sensing space... REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE LICENSING OF PRIVATE REMOTE SENSING SYSTEMS Licenses § 960.12 Data policy for remote sensing space systems. (a) In accordance with the Act, if the U.S. Government...

  20. 15 CFR 960.12 - Data policy for remote sensing space systems.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 15 Commerce and Foreign Trade 3 2014-01-01 2014-01-01 false Data policy for remote sensing space... REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE LICENSING OF PRIVATE REMOTE SENSING SYSTEMS Licenses § 960.12 Data policy for remote sensing space systems. (a) In accordance with the Act, if the U.S. Government...

  1. 15 CFR 960.12 - Data policy for remote sensing space systems.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 15 Commerce and Foreign Trade 3 2013-01-01 2013-01-01 false Data policy for remote sensing space... REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE LICENSING OF PRIVATE REMOTE SENSING SYSTEMS Licenses § 960.12 Data policy for remote sensing space systems. (a) In accordance with the Act, if the U.S. Government...

  2. 78 FR 77508 - Duke Energy Carolinas, LLC; William States Lee III Nuclear Station, Units 1 and 2; Combined...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-23

    ..., LLC; William States Lee III Nuclear Station, Units 1 and 2; Combined Licenses Application Review... Environmental Impact Statement [EIS] for Combined Licenses (COLs) for William States Lee III Nuclear Station... be accessed online at the NRC's William States Lee III Nuclear Station--specific Web page at: www.nrc...

  3. 75 FR 37471 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-29

    ...,'' Revision 2, and Nuclear Energy [Institute] (NEI) 00- 01, ``Guidance for Post-Fire Safe-Shutdown Circuit... environmental impact statement or environmental assessment need be prepared for these amendments. If the...

  4. 77 FR 16271 - Biweekly Notice: Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-20

    ... CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared for these... guidance of Nuclear Energy Institute (NEI) 04-10, ``Risk-Informed Technical Specifications Initiative 5b...

  5. 76 FR 58303 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-20

    ... environmental impact statement or environmental assessment need be prepared for these amendments. If the... provisions of the NRC-approved CSP. The proposed change is consistent with Nuclear Energy Institute (NEI) 08...

  6. 7 CFR 52.30 - Application to become a licensed sampler.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AGRICULTURAL MARKETING ACT OF 1946 PROCESSED FRUITS AND VEGETABLES, PROCESSED PRODUCTS THEREOF, AND CERTAIN OTHER PROCESSED FOOD PRODUCTS 1 Regulations Governing Inspection and Certification Licensing of Samplers...

  7. Assessing Health Impacts within Environmental Impact Assessments: An Opportunity for Public Health Globally Which Must Not Remain Missed

    PubMed Central

    Harris, Patrick; Viliani, Francesca; Spickett, Jeff

    2015-01-01

    Within the member states of the United Nations 190 of 193 have regulated Environmental Impact Assessments (EIA) which is a systematic process to prevent and mitigate the potential environmental impacts of industry development projects before these occur. However, the routine and comprehensive assessment of health impacts within EIAs remains underdeveloped. Focusing, as an example, on the risks to global health from the global shift in the mining industry towards Low and Middle Income Countries LMIC), this viewpoint details why connecting with EIA is an essential task for the health system. Although existing knowledge is out of date in relation to global practice we identify how health has been included, to some extent, in High Income Country EIAs and the institutional requirements for doing so. Using arguments identified by industry themselves about requiring a ‘social license to operate’, we conclude that EIA regulations provide the best current mechanism to ensure health protection is a core aspect in the decision making process to approve projects. PMID:25608592

  8. Assessing the cumulative environmental effects of marine renewable energy developments: Establishing common ground.

    PubMed

    Willsteed, Edward; Gill, Andrew B; Birchenough, Silvana N R; Jude, Simon

    2017-01-15

    Assessing and managing the cumulative impacts of human activities on the environment remains a major challenge to sustainable development. This challenge is highlighted by the worldwide expansion of marine renewable energy developments (MREDs) in areas already subject to multiple activities and climate change. Cumulative effects assessments in theory provide decision makers with adequate information about how the environment will respond to the incremental effects of licensed activities and are a legal requirement in many nations. In practise, however, such assessments are beset by uncertainties resulting in substantial delays during the licensing process that reduce MRED investor confidence and limit progress towards meeting climate change targets. In light of these targets and ambitions to manage the marine environment sustainably, reducing the uncertainty surrounding MRED effects and cumulative effects assessment are timely and vital. This review investigates the origins and evolution of cumulative effects assessment to identify why the multitude of approaches and pertinent research have emerged, and discusses key considerations and challenges relevant to assessing the cumulative effects of MREDs and other activities on ecosystems. The review recommends a shift away from the current reliance on disparate environmental impact assessments and limited strategic environmental assessments, and a move towards establishing a common system of coordinated data and research relative to ecologically meaningful areas, focussed on the needs of decision makers tasked with protecting and conserving marine ecosystems and services. Copyright © 2016. Published by Elsevier B.V.

  9. 15 CFR 970.700 - General.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Environmental Effects § 970.700 General... Administrator of any term, condition or restriction if relevant data and other information indicates that...

  10. 15 CFR 970.700 - General.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Environmental Effects § 970.700 General... Administrator of any term, condition or restriction if relevant data and other information indicates that...

  11. 15 CFR 970.700 - General.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Environmental Effects § 970.700 General... Administrator of any term, condition or restriction if relevant data and other information indicates that...

  12. 10 CFR 51.16 - Proprietary information.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Proprietary information. 51.16 Section 51.16 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act-Regulations Implementing Section 102(2...

  13. 10 CFR 51.16 - Proprietary information.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Proprietary information. 51.16 Section 51.16 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act-Regulations Implementing Section 102(2...

  14. 15 CFR 970.700 - General.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Environmental Effects § 970.700 General... Administrator of any term, condition or restriction if relevant data and other information indicates that...

  15. 15 CFR 970.700 - General.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Environmental Effects § 970.700 General... Administrator of any term, condition or restriction if relevant data and other information indicates that...

  16. Final Environmental Impact Statement for the construction and operation of Claiborne Enrichment Center, Homer, Louisiana (Docket No. 70-3-70). Volume 2, Public comments and NRC response

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zeitoun, A.

    The Final Environmental Impact Statement (FEIS) (Volume 1), was prepared by the Nuclear Regulatory Commission (NRC) in accordance with regulation 10 CFR Part 51, which implements the National Environmental Policy Act (NEPA), to assess the potential environmental impacts for licensing the construction and operation of a proposed gaseous centrifuge enrichment facility to be built in Claiborne Parish, Louisiana by Louisiana Energy Services, L.P. (LES). The proposed facility would have a production capacity of about 866 metric tons annually of up to 5 weight percent enriched UF{sub 6}, using a proven centrifuge technology. Included in the assessment are co on, bothmore » normal operations and potential accidents (internal and external events), and the eventual decontamination and decommissioning of the site. In order to help assure that releases from the operation of the facility and potential impacts on the public are as low as reasonably achievable, an environmental monitoring program was developed by LES to detect significant changes in the background levels of uranium around the site. Other issues addressed include the purpose and need for the facility, the alternatives to the proposed action, potential disposition of the tails, the site selection process, and environmental justice. The NRC staff concludes that the facility can be constructed and operated with small and acceptable impacts on the public and the environment, and proposes to issue a license to the applicant, Louisiana Energy Services, to authorize construction and operation of the proposed facility. The letters in this Appendix have been divided into three sections. Section One contains letters to which the NRC responded by addressing specific comments. Section Two contains the letters that concerned the communities of Forest Grove and Center Springs. Section Three is composed of letters that required no response. These letters were generally in support of the facility.« less

  17. 76 FR 41790 - Natural Currents Energy Services, LLC; Notice of Intent To File License Application, Filing of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-15

    ... Energy Services, LLC; Notice of Intent To File License Application, Filing of Draft Application, Request for Waivers of Integrated Licensing Process Regulations Necessary for Expedited Processing of a.... Project No.: 12718-002. c. Date Filed: June 28, 2011. d. Submitted By: Natural Currents Energy Services...

  18. 76 FR 1612 - Natural Currents Energy Services, LLC; Notice of Intent To File License Application, Filing of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-11

    ... Energy Services, LLC; Notice of Intent To File License Application, Filing of Draft Application, Request for Waivers of Integrated Licensing Process Regulations Necessary for Expedited Processing of a... Energy Services, LLC. e. Name of Project: Will's Hole Tidal Electric Project. f. Location: The project...

  19. Chapter 5, "License Renewal and Aging Management for Continued Service

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Naus, Dan J

    As of August 2011, there were 104 commercial nuclear power reactors licensed to operate in 31 states in the United States. Initial operating licenses in the United States are granted for a period of 40 years. In order to help assure an adequate energy supply, the USNRC has established a timely license renewal process and clear requirements that are needed to ensure safe plant operation for an extended plant life. The principals of license renewal and the basic requirements that address license renewal are identified as well as additional sources of guidance that can be utilized as part of themore » license renewal process. Aging management program inspections and operating experience related to the concrete and steel containment structures are provided. Finally, several lessons learned are provided based on containment operating experience.« less

  20. 76 FR 32866 - Cable Landing Licenses; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-07

    ... FEDERAL COMMUNICATIONS COMMISSION 47 CFR Part 1 [DA 11-668] Cable Landing Licenses; Correction... Systems Agency and affects applicants requesting streamlined processing of cable landing license... paragraph (j) to read as follows: Sec. 1.767 Cable landing licenses. * * * * * (j) Applications for...

  1. Environmental permitting in Thailand

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Byers, A.C.

    Thailand's 1992 enhancement and Conservation of Environmental Quality Act and regulations require any entry proposing to construct a thermal power plant with a capacity greater that 10 MW to perform various environmental studies and prepare an environmental Impact Assessment (EIA) report in accordance with the guidelines issued by the office of Environmental Policy and Planning (OEPP). Approval of the EIA is a prerequisite to the issuance of most other construction permits. Applicable environmental standards and regulation are promulgated by the Pollution Control Department (PCD), a wholly separate agency for the OEPP. The PCD is a fairly new organization and, asmore » a result, their staff is still gaining understanding of the multiple environmental aspects of power generation. Accordingly, the PCD is still in process of drafting key regulations applicable to the power industry. This paper examines the current guidelines, practices, procedures and legal requirements regarding environmental licensing of a thermal power plant in Thailand. The requisite scope and content of the EIA report will be identified, as well as the current procedure for its official review and approval by the OEPP. The paper will address the challenges of working with local consultants and identify potential pitfalls in the report preparation process. Areas of particular interest in the EIA review will be identified based on recent examples of OEPP comments on previous SPP and IPP projects. Additionally, the development of applicable environmental standards by the PCD will be identified along with their plans for implementing these standards. The paper will also examine the relationship of the OEPP and PCD, and reflect upon trends for environmental regulation in Thailand in the near future.« less

  2. 33 CFR 148.710 - What environmental conditions must be satisfied?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false What environmental conditions... Deepwater Ports § 148.710 What environmental conditions must be satisfied? (a) MARAD may issue a license to construct a deepwater port under the Act, with or without conditions, if certain specified conditions are...

  3. 33 CFR 148.710 - What environmental conditions must be satisfied?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false What environmental conditions... Deepwater Ports § 148.710 What environmental conditions must be satisfied? (a) MARAD may issue a license to construct a deepwater port under the Act, with or without conditions, if certain specified conditions are...

  4. 33 CFR 148.710 - What environmental conditions must be satisfied?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false What environmental conditions... Deepwater Ports § 148.710 What environmental conditions must be satisfied? (a) MARAD may issue a license to construct a deepwater port under the Act, with or without conditions, if certain specified conditions are...

  5. 33 CFR 148.710 - What environmental conditions must be satisfied?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false What environmental conditions... Deepwater Ports § 148.710 What environmental conditions must be satisfied? (a) MARAD may issue a license to construct a deepwater port under the Act, with or without conditions, if certain specified conditions are...

  6. 75 FR 80545 - Carolina Power & Light Company; H.B. Robinson Steam Electric Plant, Unit No. 2; Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-22

    ....B. Robinson Steam Electric Plant, Unit No. 2; Environmental Assessment and Finding of No Significant...), for operation of the H. B. Robinson Steam Electric Plant, Unit 2 (HBRSEP), located in Darlington... ``Generic Environmental Impact Statement for License Renewal of Nuclear Plants: H.B. Robinson Steam Electric...

  7. Riparian Communities of the Sierra Nevada and their Environmental Relationships

    Treesearch

    Richard R. Harris

    1989-01-01

    Data on riparian community composition and environmental conditions were collected on over 20 streams in the Sierra Nevada as part of hydropower licensing studies. Over 1,000 samples were analyzed using two-way indicator species analysis (TWINSPAN), to determine riparian dominance types. Ordination techniques were applied to evaluate associations between environmental...

  8. Final Environmental Assessment for Jacksonville Aviation Authority Launch Site Operator License at Cecil Field, Florida

    DTIC Science & Technology

    2009-07-01

    eligible areas near Cecil Field – Branan Field Mitigation Park Wildlife and Environmental Area , Cecil Field Conservation Corridor, and Sal Taylor... Environmental Health Risks and Safety Risks (April 21, 1997), Federal agencies are directed to make it a high priority to identify and assess ... Environmental Protection 3900 Commonwealth Blvd. Mail Station 47 Tallahassee, FL 32399-3000 Dear Ms. Milligan: RE: Environmental Assessment

  9. 10 CFR 2.103 - Action on applications for byproduct, source, special nuclear material, facility and operator...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... State Materials and Environmental Management Programs, or Director, Office of Nuclear Material Safety... Reorganization Act, and this chapter, he will issue a license. If the license is for a facility, or for receipt... operations area under parts 60 or 63 of this chapter, or if it is to receive and possess high-level...

  10. 75 FR 70952 - Extension of Public Comment Period on the Draft Environmental Assessment and Draft Finding of No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-19

    ... Fuel Services, Inc. (NFS) fuel fabrication facility in Erwin, Tennessee, closed on November 13, 2010... NFS facility and license renewal at the NRC's PDR, located at One White Flint North, 11555 Rockville... with the review of the NFS license renewal application, please contact Kevin Ramsey at 301-492-3123 or...

  11. 10 CFR Appendix B to Subpart A of... - Environmental Effect of Renewing the Operating License of a Nuclear Power Plant

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...). Aquatic Ecology (for all plants) Refurbishment 1 SMALL. During plant shutdown and refurbishment there will... cooling ponds and is not expected to be a problem during the license renewal term. Aquatic Ecology (for...)(ii)(B). Aquatic Ecology (for plants with cooling-tower-based heat dissipation systems) Entrainment of...

  12. 77 FR 74882 - STP Nuclear Operating Company, South Texas Project; Notice of Availability of Draft Supplement 48...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-18

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos.: 50-498 and 50-499; NRC-2010-0375] STP Nuclear Operating Company, South Texas Project; Notice of Availability of Draft Supplement 48 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants and Public Meetings for the License Renewal of South Texas Project Notice is hereby...

  13. 76 FR 29279 - Prairie Island Nuclear Generating Plant, Units 1 and 2; Notice of Availability of the Final...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-20

    ... NUCLEAR REGULATORY COMMISSION NORTHERN STATES POWER COMPANY [Docket Numbers 50-282 and 50-306; NRC-2009-0507] Prairie Island Nuclear Generating Plant, Units 1 and 2; Notice of Availability of the Final Supplement 39 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding the License Renewal of Prairie Island...

  14. 78 FR 36014 - Deepwater Port License Application: Liberty Natural Gas, LLC, Port Ambrose Deepwater Port

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-14

    ... (NEPA) of 1969 (42 U.S.C. 4321 et seq.). The U.S. Environmental Protection Agency (EPA) and the U.S... Coastal State'' any coastal state which (A) would be directly connected by pipeline to a deepwater port as... the Designation of Adjacent Coastal States for Deepwater Port License Applications in the Federal...

  15. Shell Canada Limited application for a well license, Quirk Creek field, LSD 16-19-21-4 W5M: Decision 98-9, application number 970451

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-09-01

    Shell Canada Ltd. applied to the Alberta Energy and Utilities Board for a license to drill a deviated sour gas exploration well from a location in the Kananaskis Country Recreation Area. This report presents the views of Shell, the Board, and various intervenors at a hearing held to consider matters related to the application. Issues discussed include the need for the well, the surface location of the well, access management, environmental impacts, the need for an environmental assessment, and public safety. The report concludes with the Board`s decision and conditions for approval.

  16. 10 CFR 51.11 - Relationship to other subparts. [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Relationship to other subparts. [Reserved] 51.11 Section 51.11 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act-Regulations...

  17. 10 CFR 51.110 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false [Reserved] 51.110 Section 51.110 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act-Regulations Implementing Section 102(2) Rulemaking § 51.110...

  18. 10 CFR 51.13 - Emergencies.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Emergencies. 51.13 Section 51.13 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act-Regulations Implementing Section 102(2) § 51.13 Emergencies...

  19. 10 CFR 51.88 - Proposals for legislation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Proposals for legislation. 51.88 Section 51.88 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act-Regulations Implementing Section 102(2...

  20. 10 CFR 51.125 - Responsible official.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Responsible official. 51.125 Section 51.125 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act-Regulations Implementing Section 102(2) Responsible...

  1. 10 CFR 51.17 - Information collection requirements; OMB approval.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Information collection requirements; OMB approval. 51.17 Section 51.17 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act-Regulations...

  2. 10 CFR 51.17 - Information collection requirements; OMB approval.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Information collection requirements; OMB approval. 51.17 Section 51.17 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act-Regulations...

  3. 10 CFR 51.13 - Emergencies.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Emergencies. 51.13 Section 51.13 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act-Regulations Implementing Section 102(2) § 51.13 Emergencies...

  4. 10 CFR 51.110 - [Reserved

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false [Reserved] 51.110 Section 51.110 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act-Regulations Implementing Section 102(2) Rulemaking § 51.110...

  5. 10 CFR 51.11 - Relationship to other subparts. [Reserved

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Relationship to other subparts. [Reserved] 51.11 Section 51.11 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act-Regulations...

  6. 10 CFR 51.125 - Responsible official.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Responsible official. 51.125 Section 51.125 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act-Regulations Implementing Section 102(2) Responsible...

  7. 77 FR 55210 - Public Service Company of New Hampshire; Notice of Intent To File License Application, Filing of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2457-038] Public Service... (PAD), Commencement of Pre-Filing Process, and Scoping; Request for Comments on the PAD And Scoping... File License Application for a New License and Commencing Pre-filing Process. b. Project No.: 2457-038...

  8. 77 FR 61585 - FPL Energy Maine Hydro LLC; Notice of Intent To File License Application, Filing of Pre...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-10

    ... Hydro LLC; Notice of Intent To File License Application, Filing of Pre-Application Document (PAD... Application for a New License and Commencing Pre-filing Process. b. Project No.: 2531-067. c. Dated Filed... Commission a Pre-Application Document (PAD; including a proposed process plan and schedule), pursuant to 18...

  9. 77 FR 61584 - FFP Missouri 12, LLC; Notice of Intent To File License Application, Filing of Pre-Application...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-10

    ..., LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving... Application and Request to Use the Traditional Licensing Process. b. Project No.: 13755-001. c. Date Filed.... m. Free Flow Power filed a Pre-Application Document (PAD; including a proposed process plan and...

  10. Environmental assessment proposed license renewal of Nuclear Metals, Inc. Concord, Massachusetts

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miller, R.L.; Easterly, C.E.; Lombardi, C.E.

    1997-02-01

    The US Nuclear Regulatory Commission (NRC) has prepared this Environmental Assessment (EA) to evaluate environmental issues associated with the renewal of licenses issued by NRC for facilities operated by Nuclear Metals, Inc. (NMI) in Concord, Massachusetts. By renewing the licenses, NRC proposes to allow the continuation of ongoing operations involving radioactive materials at NMI`s facilities. This EA focuses on the potential impacts related to air emissions at NMI during normal (incident-free) operations and accidental releases. Findings indicate that there are only two areas of potential concern. First, modeling results for sulfur dioxide (SO{sub 2}) emissions from the boilers during normalmore » operations indicate that the potential exists for exceeding the short-term National Ambient Air Quality Standards (NAAQS). NMI is prepared to undertake mitigative action to prevent potential exceedances of the short-term SO{sub 2} NAAQS, and the Massachusetts Department of Environmental Protection is prepared to resolve the issue via a permit/approval change or through a Consent Order. Second, in the unlikely event of a severe fire, predicted sulfuric acid (H{sub 2}SO{sub 4}) concentrations based on conservative (upper bound) modeling exceed the Emergency Response Planning Guideline (ERPG) levels. NMI has committed to NRC to give a briefing for local emergency response officials regarding the potential for an accidental H{sub 2}SO{sub 4} release.« less

  11. 75 FR 70032 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-16

    ...- approved Cyber Security Plan. The proposed change is consistent with Nuclear Energy Institute (NEI) 08-09... CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared for these... with 10 CFR 51.22. Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or...

  12. 10 CFR 51.116 - Notice of intent.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Notice of intent. 51.116 Section 51.116 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act-Regulations Implementing Section 102(2) Public Notice...

  13. 10 CFR 51.27 - Notice of intent.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Notice of intent. 51.27 Section 51.27 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act-Regulations Implementing Section 102(2) Determinations...

  14. 10 CFR 51.124 - Commission duty to comment.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Commission duty to comment. 51.124 Section 51.124 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act-Regulations Implementing Section 102(2...

  15. 10 CFR 51.1 - Scope.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Scope. 51.1 Section 51.1 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS § 51.1 Scope. This part contains environmental protection regulations applicable to NRC's domestic...

  16. 10 CFR 51.28 - Scoping-participants.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Scoping-participants. 51.28 Section 51.28 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act-Regulations Implementing Section 102(2) Scoping § 51...

  17. 10 CFR 51.14 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Definitions. 51.14 Section 51.14 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act-Regulations Implementing Section 102(2) § 51.14 Definitions. (a...

  18. 10 CFR 51.1 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Scope. 51.1 Section 51.1 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS § 51.1 Scope. This part contains environmental protection regulations applicable to NRC's domestic...

  19. 10 CFR 51.32 - Finding of no significant impact.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Finding of no significant impact. 51.32 Section 51.32 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act-Regulations Implementing...

  20. 10 CFR 51.27 - Notice of intent.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Notice of intent. 51.27 Section 51.27 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act-Regulations Implementing Section 102(2) Determinations...

  1. 10 CFR 51.122 - List of interested organizations and groups.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false List of interested organizations and groups. 51.122 Section 51.122 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act-Regulations...

  2. 10 CFR 51.28 - Scoping-participants.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Scoping-participants. 51.28 Section 51.28 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act-Regulations Implementing Section 102(2) Scoping § 51...

  3. 10 CFR 51.100 - Timing of Commission action.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Timing of Commission action. 51.100 Section 51.100 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act-Regulations Implementing Section 102(2...

  4. 10 CFR 51.122 - List of interested organizations and groups.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false List of interested organizations and groups. 51.122 Section 51.122 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act-Regulations...

  5. 10 CFR 51.116 - Notice of intent.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Notice of intent. 51.116 Section 51.116 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act-Regulations Implementing Section 102(2) Public Notice...

  6. 10 CFR 51.100 - Timing of Commission action.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Timing of Commission action. 51.100 Section 51.100 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act-Regulations Implementing Section 102(2...

  7. Inspection of the Department`s export licensing process for dual-use and munitions commodities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-08-10

    The purpose of our inspection was to review the Department of Energy`s (Energy) export licensing process for dual-use and military (munitions) commodities subject to nuclear nonproliferation controls. Specifically, we reviewed Energy`s authorities, procedures, and policies pertaining to the export licensing process and examined procedures for safeguarding data transmitted between Energy and other agencies involved in the export licensing process. We also reviewed Energy`s role as a member of the Subgroup on Nuclear Export Coordination. Our review of the sample of 60 export cases did not find evidence to lead us to believe that Energy`s recommendations for these cases were inappropriatemore » or incorrect. We identified, however, problems regarding management systems associated with the export license review process. We found that without documentation supporting export licensing decisions by the Export Control Operations Division (ECOD), we could not determine whether ECOD analysts considered all required criteria in their review of export cases referred to Energy. For example, we found that the ECOD did not retain records documenting the bases for its advice, recommendations, or decisions regarding its reviews of export license cases or revisions to lists of controlled commodities and, therefore, was not in compliance with certain provisions of the Export Administration Act, as amended, and Energy records management directives. Additionally, we found that the degree of compliance by Energy with the export licensing review criteria contained in the Export Administration Regulations and the Nuclear Non-Proliferation Act of 1978 could not be determined because ECOD did not retain records documenting the bases for its advice and recommendations on export cases.« less

  8. 78 FR 56944 - Pacific Gas and Electric Company; Humboldt Bay Independent Spent Fuel Storage Installation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-16

    ... Class C (GTCC) process waste at the Humboldt Bay ISFSI. PG&E submitted its license amendment request by... proposed amendment to License No. SNM-2514 to allow storage of GTCC process waste at the Humboldt Bay ISFSI... fuel and is authorized by NRC, under License No. SNM-2514, to also store GTCC activated metal waste at...

  9. License restrictions at Barnwell

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Autry, V.R.

    1991-12-31

    The State of South Carolina was delegated the authority by the US Nuclear Regulatory Commission to regulate the receipt, possession, use and disposal of radioactive material as an Agreement State. Since 1970, the state has been the principal regulatory authority for the Barnwell Low-Level Waste Disposal Facility operated by Chem-Nuclear Systems, Inc. The radioactive material license issued authorizing the receipt and disposal of low-level waste contains numerous restrictions to ensure environmental protection and compliance with shallow land disposal performance criteria. Low-level waste has evolved from minimally contaminated items to complex waste streams containing high concentrations of radionuclides and processing chemicalsmore » which necessitated these restrictions. Additionally, some waste with their specific radionuclides and concentration levels, many classified as low-level radioactive waste, are not appropriate for shallow land disposal unless additional precautions are taken. This paper will represent a number of these restrictions, the rationale for them, and how they are being dealt with at the Barnwell disposal facility.« less

  10. Public Hearing or `Hearing Public'? An Evaluation of the Participation of Local Stakeholders in Environmental Impact Assessment of Ghana's Jubilee Oil Fields

    NASA Astrophysics Data System (ADS)

    Bawole, Justice Nyigmah

    2013-08-01

    This article investigates the involvement of local stakeholders in the environmental impact assessment (EIA) processes of Ghana's first off-shore oil fields (the Jubilee fields). Adopting key informants interviews and documentary reviews, the article argues that the public hearings and the other stakeholder engagement processes were cosmetic and rhetoric with the view to meeting legal requirements rather than a purposeful interest in eliciting inputs from local stakeholders. It further argues that the operators appear to lack the social legitimacy and social license that will make them acceptable in the project communities. A rigorous community engagement along with a commitment to actively involving local stakeholders in the corporate social responsibility (CSR) programmes of the partners may enhance the image of the partners and improve their social legitimacy. Local government agencies should be capacitated to actively engage project organisers; and government must mitigate the impact of the oil projects through well-structured social support programmes.

  11. Public hearing or 'hearing public'? an evaluation of the participation of local stakeholders in environmental impact assessment of Ghana's Jubilee oil fields.

    PubMed

    Bawole, Justice Nyigmah

    2013-08-01

    This article investigates the involvement of local stakeholders in the environmental impact assessment (EIA) processes of Ghana's first off-shore oil fields (the Jubilee fields). Adopting key informants interviews and documentary reviews, the article argues that the public hearings and the other stakeholder engagement processes were cosmetic and rhetoric with the view to meeting legal requirements rather than a purposeful interest in eliciting inputs from local stakeholders. It further argues that the operators appear to lack the social legitimacy and social license that will make them acceptable in the project communities. A rigorous community engagement along with a commitment to actively involving local stakeholders in the corporate social responsibility (CSR) programmes of the partners may enhance the image of the partners and improve their social legitimacy. Local government agencies should be capacitated to actively engage project organisers; and government must mitigate the impact of the oil projects through well-structured social support programmes.

  12. 15 CFR 970.701 - Significant adverse environmental effects.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES... effects of deep seabed mining which cumulatively during commercial recovery have the potential for significant effect. These three effects also occur during mining system tests that may be conducted under a...

  13. 15 CFR 970.701 - Significant adverse environmental effects.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES... effects of deep seabed mining which cumulatively during commercial recovery have the potential for significant effect. These three effects also occur during mining system tests that may be conducted under a...

  14. 15 CFR 970.701 - Significant adverse environmental effects.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES... effects of deep seabed mining which cumulatively during commercial recovery have the potential for significant effect. These three effects also occur during mining system tests that may be conducted under a...

  15. 78 FR 35624 - Shelbyville Hydro LLC; Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13011-003] Shelbyville Hydro LLC; Notice of Availability of Environmental Assessment In accordance with the National... of Energy Projects has reviewed Shelbyville Hydro LLC's application for an original license for the...

  16. 10 CFR 51.34 - Preparation of finding of no significant impact.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Preparation of finding of no significant impact. 51.34 Section 51.34 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act-Regulations...

  17. 10 CFR 51.34 - Preparation of finding of no significant impact.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Preparation of finding of no significant impact. 51.34 Section 51.34 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act-Regulations...

  18. 15 CFR 970.701 - Significant adverse environmental effects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES... effects of deep seabed mining which cumulatively during commercial recovery have the potential for significant effect. These three effects also occur during mining system tests that may be conducted under a...

  19. 15 CFR 970.701 - Significant adverse environmental effects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES... effects of deep seabed mining which cumulatively during commercial recovery have the potential for significant effect. These three effects also occur during mining system tests that may be conducted under a...

  20. 10 CFR 61.53 - Environmental monitoring.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Technical Requirements for Land Disposal Facilities § 61.53 Environmental monitoring. (a) At the time a... radionuclides would indicate that the performance objectives of subpart C may not be met. (c) During the land...

  1. 10 CFR 61.53 - Environmental monitoring.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Technical Requirements for Land Disposal Facilities § 61.53 Environmental monitoring. (a) At the time a... radionuclides would indicate that the performance objectives of subpart C may not be met. (c) During the land...

  2. 10 CFR 61.53 - Environmental monitoring.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Technical Requirements for Land Disposal Facilities § 61.53 Environmental monitoring. (a) At the time a... radionuclides would indicate that the performance objectives of subpart C may not be met. (c) During the land...

  3. 10 CFR 61.53 - Environmental monitoring.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Technical Requirements for Land Disposal Facilities § 61.53 Environmental monitoring. (a) At the time a... radionuclides would indicate that the performance objectives of subpart C may not be met. (c) During the land...

  4. 10 CFR 61.53 - Environmental monitoring.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Technical Requirements for Land Disposal Facilities § 61.53 Environmental monitoring. (a) At the time a... radionuclides would indicate that the performance objectives of subpart C may not be met. (c) During the land...

  5. On the preparation of environmental impact statements in the United States of America

    NASA Astrophysics Data System (ADS)

    Carson, James E.

    The National Environmental Policy Act of 1969 (NEPA) requires that an Environmental Impact Statement (FIS) be prepared whenever a federal action is considered that could result in a significant impact on the environment. Such actions include the issuance of construction or operating licenses for nuclear facilities and power plants, hydroelectric dams, or the diversion of water from rivers and lakes. An EIS is usually required if federal funds are involved. The U.S. Environmental Protection Agency and U.S. Council for Environmental Quality have developed guidelines and regulations for the preparation of an EIS. An EIS is not a scientific report. It is a legal document whose primary function is its use by decision-making agencies in approving or not approving the proposed federal action. The EIS is also used to inform the public and other government agencies of the environmental impacts of the proposed facility. The NEPA process allows public input into the decision-making process. An EIS should be short and concise, analytical, conclusory, be written for a non-technical audience, discuss the pros and cons of the proposed facility, and examine the impacts of all alternatives to the proposed action. The EIS should identify all adverse environmental impacts that cannot be avoided. The conclusions reached in the EIS should be clearly stated and supported by discussions and data in the text and by references to show that the agency has made the necessary analyses. The paper discusses the purpose and contents of these documents and the environmental procedures used in the U.S.A., especially as they relate to nuclear power plants.

  6. Study of the Performance and Characteristics of U.S. Academic Research Institution Technology Commercialization (ARITC)

    ERIC Educational Resources Information Center

    Kim, Jisun

    2012-01-01

    This dissertation aims to provide a better understanding of the technology licensing practices of academic research institutions. The study identifies time durations in licensing and incorporates these into a model to evaluate licensing performance. Performance is measured by the efficiency of an institution's technology licensing process and…

  7. 15 CFR 970.204 - Environmental and use conflict analysis.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES... activities in the area, including the testing of integrated mining systems which simulate commercial recovery... baseline data or plans for acquiring them. The applicant may at his option delay submission of baseline and...

  8. 15 CFR 970.204 - Environmental and use conflict analysis.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES... activities in the area, including the testing of integrated mining systems which simulate commercial recovery... baseline data or plans for acquiring them. The applicant may at his option delay submission of baseline and...

  9. 15 CFR 970.204 - Environmental and use conflict analysis.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES... activities in the area, including the testing of integrated mining systems which simulate commercial recovery... baseline data or plans for acquiring them. The applicant may at his option delay submission of baseline and...

  10. 78 FR 19477 - Freedom Falls, LLC; Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-01

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Project No. 14421-000--ME] Freedom Falls, LLC; Notice of Availability of Environmental Assessment In accordance with the National... from licensing for the Freedom Falls Hydroelectric Project, to be located on Sandy Stream, in the Town...

  11. 10 CFR 51.61 - Environmental report-independent spent fuel storage installation (ISFSI) or monitored retrievable...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Environmental report-independent spent fuel storage installation (ISFSI) or monitored retrievable storage installation (MRS) license. 51.61 Section 51.61 Energy... amended at 68 FR 58811, Oct. 10, 2003] ...

  12. 10 CFR 51.119 - Publication of finding of no significant impact; distribution.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Publication of finding of no significant impact; distribution. 51.119 Section 51.119 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act...

  13. 10 CFR 51.102 - Requirement to provide a record of decision; preparation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Requirement to provide a record of decision; preparation. 51.102 Section 51.102 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act...

  14. 10 CFR 51.95 - Postconstruction environmental impact statements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... the storage of spent fuel for the nuclear power plant within the scope of the generic determination in... a license to store spent fuel at a nuclear power reactor after expiration of the operating or... Section 51.95 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR...

  15. 10 CFR 51.95 - Postconstruction environmental impact statements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... the storage of spent fuel for the nuclear power plant within the scope of the generic determination in... a license to store spent fuel at a nuclear power reactor after expiration of the operating or... Section 51.95 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR...

  16. 77 FR 40353 - Onyx Specialty Papers, Inc; Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-09

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2985-008 Massachusetts] Onyx Specialty Papers, Inc; Notice of Availability of Environmental Assessment In accordance with the...), Commission staff has reviewed the Onyx Specialty Papers, Inc.'s application for surrender of project license...

  17. 15 CFR 970.204 - Environmental and use conflict analysis.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES... activities in the area, including the testing of integrated mining systems which simulate commercial recovery... baseline data or plans for acquiring them. The applicant may at his option delay submission of baseline and...

  18. 15 CFR 970.204 - Environmental and use conflict analysis.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES... activities in the area, including the testing of integrated mining systems which simulate commercial recovery... baseline data or plans for acquiring them. The applicant may at his option delay submission of baseline and...

  19. 75 FR 43865 - Licenses, Certifications, and Approvals for Material Licensees

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-27

    .... Environmental Impact--Categorical Exclusion X. Paperwork Reduction Act Statement XI. Regulatory Analysis XII... the briefing, the Commission received a letter from the Nuclear Energy Institute (NEI) dated March 3... that such activities were conducted so as to minimize their environmental impact, and to conform the...

  20. 10 CFR 51.102 - Requirement to provide a record of decision; preparation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Requirement to provide a record of decision; preparation. 51.102 Section 51.102 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act...

  1. 10 CFR 51.119 - Publication of finding of no significant impact; distribution.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Publication of finding of no significant impact; distribution. 51.119 Section 51.119 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act...

  2. Environmental tobacco smoke: views from the Dunedin hospitality industry on prohibition of smoking in licensed premises.

    PubMed

    Reeder, A; Blair, A

    2000-11-24

    To describe Dunedin hospitality industry perceptions of difficulties in enforcement of a prohibition on smoking in licensed premises, and possible effects on staff, customers and business. To identify any need for education to assist transition and reduce compliance difficulties with smoke-free legislation. A reply paid questionnaire was mailed to all 311 licensed premises registered with the Dunedin District Licensing Agency, operational in May 1999. overall response rate (67%) differed significantly by type of premises (bar, club, restaurant and off-licence). Overall, a smoking ban was considered likely to be difficult to enforce (82%), upset customers (74%), reduce business (59%) and negatively effect employees (51%). On each issue, there was a consistent pattern of increasing concern from off-licenses (least concern) through restaurants, to clubs and bars (most concern). Considerable concern exists in the hospitality industry about the effects of extending smoke-free status to licensed premises. To assist transition and future compliance, there is a need to address these concerns and provide reliable information to calm unnecessary fears and develop appreciation of the need for change.

  3. Hydropower licensing and evolving climate: climate knowledge to support risk assessment for long-term infrastructure decisions

    NASA Astrophysics Data System (ADS)

    Ray, A. J.; Walker, S. H.; Trainor, S. F.; Cherry, J. E.

    2014-12-01

    This presentation focuses on linking climate knowledge to the complicated decision process for hydropower dam licensing, and the affected parties involved in that process. The U.S. Federal Energy Regulatory Commission issues of licenses for nonfederal hydroelectric operations, typically 30-50 year licenses, and longer infrastructure lifespan, a similar time frame as the anticipated risks of changing climate and hydrology. Resources managed by other federal and state agencies such as the NOAA National Marine Fisheries Service may be affected by new or re-licensed projects. The federal Integrated Licensing Process gives the opportunity for affected parties to recommend issues for consultative investigation and possible mitigation, such as impacts to downstream fisheries. New or re-licensed projects have the potential to "pre-adapt" by considering and incorporating risks of climate change into their planned operations as license terms and conditions. Hundreds of hydropower facilities will be up for relicensing in the coming years (over 100 in the western Sierra Nevada alone, and large-scale water projects such as the proposed Lake Powell Pipeline), as well as proposed new dams such as the Susitna project in Alaska. Therefore, there is a need for comprehensive guidance on delivering climate analysis to support understanding of risks of hydropower projects to other affected resources, and decisions on licensing. While each project will have a specific context, many of the questions will be similar. We also will discuss best practices for the use of climate science in water project planning and management, and how creating the best and most appropriate science is also still a developing art. We will discuss the potential reliability of that science for consideration in long term planning, licensing, and mitigation planning for those projects. For science to be "actionable," that science must be understood and accepted by the potential users. This process is a negotiation, with climate scientists needing to understand the concerns of users and respond, and users developing a better understanding of the state of climate science in order to make an informed choice. We will also discuss what is needed to streamline providing that analysis for the many re-licensing decisions expected in the upcoming years.

  4. Hydropower: A Regulatory Guide to Permitting and Licensing in Idaho, Montana, Oregon, and Washington.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McCoy, Gilbert A.

    1992-12-01

    The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.

  5. Hydropower : A Regulatory Guide to Permitting and Licensing in Idaho, Montana, Oregon, and Washington.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McCoy, Gilbert A.

    1992-12-01

    The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.

  6. AP1000{sup R} licensing and deployment in the United States

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jordan, R. P.; Russ, P. A.; Filiak, P. P.

    2012-07-01

    In recent years, both domestic and foreign utilities have turned to the standardized Westinghouse AP1000 plant design in satisfying their near - and long-term - sustainable energy needs. As direct support to these actions, licensing the AP1000 design has played a significant role by providing one of the fundamental bases in clearing regulatory hurdles leading to the start of new plant construction. Within the U.S. alone, Westinghouse AP1000 licensing activities have reached unprecedented milestones with the approvals of both AP1000 Design Certification and Southern Company's combined construction permit and operating license (COL) application directly supporting the construction of two newmore » nuclear plants in Georgia. Further COL application approvals are immediately pending for an additional two AP1000 plants in South Carolina. And, across the U.S. nuclear industry spectrum, there are 10 other COL applications under regulatory review representing some 16 new plants at 10 sites. In total, these actions represent the first wave of new plant licensing under the regulatory approval process since 1978. Fundamental to the Nuclear Regulatory Commission's AP1000 Design Certification is the formal recognition of the AP1000 passive safety design through regulatory acceptance rulemaking. Through recognition and deployment of the AP1000 Design Certification, the utility licensee / operator of this reactor design are now offered an opportunity to use a simplified 'one-step' combined license process, thereby managing substantial back-end construction schedule risk from regulatory and intervention delays. Application of this regulatory philosophy represents both acceptance and encouragement of standardized reactor designs like the AP1000. With the recent AP1000 Design Certification and utility COL acceptances, the fundamental licensing processes of this philosophy have successfully proven the attainment of significant milestones with the next stage licensing actions directed towards deployment. AP1000 Design Certification and COL deployment, and management of the plant construction in accordance with the conditions within these approvals, remain as significant site and corporate responsibilities. These licensing-construction integrated activities must now focus on identifying and resolving 'as-built' departures from the standardized design as assessed against the certified AP1000 technical and licensing basis. Within this paper, significant aspects of the AP1000 U.S. licensing will be discussed, including identifying systems and processes used in ensuring compliance while deploying the standardized design. Critical licensing steps, licensing deployment actions as plant construction progresses and defining the road forward to a successful completion of licensing actions will be addressed. (authors)« less

  7. Termination of Lease and the Transfer of Property Back to the Landowner for the Matagorda, Texas Tethered Aerostat Radar System (TARS) Site

    DTIC Science & Technology

    2010-01-01

    Above-ground Storage Tank CAA Clean Air Act CEQ Council on Environmental Quality CERCLA Comprehensive Environmental Response...on Environmental Quality TDLR Texas Department of Licensing and Regulation THC Texas Historical Commission TPWD Texas Parks and... Storage Tank FINDING OF NO SIGNIFICANT IMPACT 1.0 NAME OF THE PROPOSED ACTION Environmental Assessment (EA) for the proposed action to terminate the

  8. OpenFLUID: an open-source software environment for modelling fluxes in landscapes

    NASA Astrophysics Data System (ADS)

    Fabre, Jean-Christophe; Rabotin, Michaël; Crevoisier, David; Libres, Aline; Dagès, Cécile; Moussa, Roger; Lagacherie, Philippe; Raclot, Damien; Voltz, Marc

    2013-04-01

    Integrative landscape functioning has become a common concept in environmental management. Landscapes are complex systems where many processes interact in time and space. In agro-ecosystems, these processes are mainly physical processes, including hydrological-processes, biological processes and human activities. Modelling such systems requires an interdisciplinary approach, coupling models coming from different disciplines, developed by different teams. In order to support collaborative works, involving many models coupled in time and space for integrative simulations, an open software modelling platform is a relevant answer. OpenFLUID is an open source software platform for modelling landscape functioning, mainly focused on spatial fluxes. It provides an advanced object-oriented architecture allowing to i) couple models developed de novo or from existing source code, and which are dynamically plugged to the platform, ii) represent landscapes as hierarchical graphs, taking into account multi-scale, spatial heterogeneities and landscape objects connectivity, iii) run and explore simulations in many ways : using the OpenFLUID software interfaces for users (command line interface, graphical user interface), or using external applications such as GNU R through the provided ROpenFLUID package. OpenFLUID is developed in C++ and relies on open source libraries only (Boost, libXML2, GLib/GTK, OGR/GDAL, …). For modelers and developers, OpenFLUID provides a dedicated environment for model development, which is based on an open source toolchain, including the Eclipse editor, the GCC compiler and the CMake build system. OpenFLUID is distributed under the GPLv3 open source license, with a special exception allowing to plug existing models licensed under any license. It is clearly in the spirit of sharing knowledge and favouring collaboration in a community of modelers. OpenFLUID has been involved in many research applications, such as modelling of hydrological network transfer, diagnosis and prediction of water quality taking into account human activities, study of the effect of spatial organization on hydrological fluxes, modelling of surface-subsurface water exchanges, … At LISAH research unit, OpenFLUID is the supporting development platform of the MHYDAS model, which is a distributed model for agrosystems (Moussa et al., 2002, Hydrological Processes, 16, 393-412). OpenFLUID web site : http://www.openfluid-project.org

  9. 15 CFR 970.500 - General.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Issuance/Transfer/Terms, Conditions and...

  10. 15 CFR 970.500 - General.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Issuance/Transfer/Terms, Conditions and...

  11. 15 CFR 970.500 - General.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Issuance/Transfer/Terms, Conditions and...

  12. 15 CFR 970.500 - General.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Issuance/Transfer/Terms, Conditions and...

  13. 15 CFR 970.500 - General.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Issuance/Transfer/Terms, Conditions and...

  14. Puget Sound Tidal Energy In-Water Testing and Development Project Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Collar, Craig W

    2012-11-16

    Tidal energy represents potential for the generation of renewable, emission free, environmentally benign, and cost effective energy from tidal flows. A successful tidal energy demonstration project in Puget Sound, Washington may enable significant commercial development resulting in important benefits for the northwest region and the nation. This project promoted the United States Department of Energy's Wind and Hydropower Technologies Program's goals of advancing the commercial viability, cost-competitiveness, and market acceptance of marine hydrokinetic systems. The objective of the Puget Sound Tidal Energy Demonstration Project is to conduct in-water testing and evaluation of tidal energy technology as a first step towardmore » potential construction of a commercial-scale tidal energy power plant. The specific goal of the project phase covered by this award was to conduct all activities necessary to complete engineering design and obtain construction approvals for a pilot demonstration plant in the Admiralty Inlet region of the Puget Sound. Public Utility District No. 1 of Snohomish County (The District) accomplished the objectives of this award through four tasks: Detailed Admiralty Inlet Site Studies, Plant Design and Construction Planning, Environmental and Regulatory Activities, and Management and Reporting. Pre-Installation studies completed under this award provided invaluable data used for site selection, environmental evaluation and permitting, plant design, and construction planning. However, these data gathering efforts are not only important to the Admiralty Inlet pilot project. Lessons learned, in particular environmental data gathering methods, can be applied to future tidal energy projects in the United States and other parts of the world. The District collaborated extensively with project stakeholders to complete the tasks for this award. This included Federal, State, and local government agencies, tribal governments, environmental groups, and others. All required permit and license applications were completed and submitted under this award, including a Final License Application for a pilot hydrokinetic license from the Federal Energy Regulatory Commission. The tasks described above have brought the project through all necessary requirements to construct a tidal pilot project in Admiralty Inlet with the exception of final permit and license approvals, and the selection of a general contractor to perform project construction.« less

  15. 78 FR 21930 - Aquenergy Systems, Inc.; Notice of Intent To File License Application, Filing of Pre-Application...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-12

    ... Systems, Inc.; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process a. Type of Filing: Notice of Intent to File License...: November 11, 2012. d. Submitted by: Aquenergy Systems, Inc., a fully owned subsidiaries of Enel Green Power...

  16. Application Of The Iberdrola Licensing Methodology To The Cofrentes BWR-6 110% Extended Power Up-rate

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mata, Pedro; Fuente, Rafael de la; Iglesias, Javier

    Iberdrola (spanish utility) and Iberdrola Ingenieria (engineering branch) have been developing during the last two years the 110% Extended Power Up-rate Project (EPU 110%) for Cofrentes BWR-6. IBERDROLA has available an in-house design and licensing reload methodology that has been approved by the Spanish Nuclear Regulatory Authority. This methodology has been already used to perform the nuclear design and the reload licensing analysis for Cofrentes cycles 12 to 14. The methodology has been also applied to develop a significant number of safety analysis of the Cofrentes Extended Power Up-rate including: Reactor Heat Balance, Core and Fuel performance, Thermal Hydraulic Stability,more » ECCS LOCA Evaluation, Transient Analysis, Anticipated Transient Without Scram (ATWS) and Station Blackout (SBO) Since the scope of the licensing process of the Cofrentes Extended Power Up-rate exceeds the range of analysis included in the Cofrentes generic reload licensing process, it has been required to extend the applicability of the Cofrentes licensing methodology to the analysis of new transients. This is the case of the TLFW transient. The content of this paper shows the benefits of having an in-house design and licensing methodology, and describes the process to extend the applicability of the methodology to the analysis of new transients. The case of analysis of Total Loss of Feedwater with the Cofrentes Retran Model is included as an example of this process. (authors)« less

  17. 33 CFR 148.705 - What is determined by the environmental evaluation?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false What is determined by the environmental evaluation? 148.705 Section 148.705 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF... to be used in evaluating a license application are established by general consensus of expertise...

  18. 75 FR 52523 - Bowersock Mills and Power Company; Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-26

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13526-002-KS] Bowersock Mills and Power Company; Notice of Availability of Environmental Assessment August 19, 2010. In... reviewed the application for an original license for the Bowersock Mills and Power Company's Expanded...

  19. 77 FR 5505 - Eagle Crest Energy Company; Notice of Availability of the Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-03

    ... Energy Projects has reviewed the application for license for the Eagle Mountain Pumped Storage... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13123-002--California] Eagle Crest Energy Company; Notice of Availability of the Final Environmental Impact Statement for the...

  20. 75 FR 55323 - Ha-Best, Inc.; Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-10

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12492-001] Ha-Best, Inc.; Notice of Availability of Environmental Assessment August 31, 2010. In accordance with the National... Office of Energy Projects has reviewed Ha-Best's application for license for the Miner Shoal Waterpower...

  1. 77 FR 67359 - Wickiup Hydro Group, LLC, Oregon; Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-09

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12965-002] Wickiup Hydro Group, LLC, Oregon; Notice of Availability of Environmental Assessment In accordance with the National... Projects has reviewed Wickiup Hydro Group, LLC's application for an original license for the Wickiup Dam...

  2. 77 FR 25999 - Wickiup Hydro Group, LLC; Oregon; Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-02

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12965-002] Wickiup Hydro Group, LLC; Oregon; Notice of Availability of Environmental Assessment In accordance with the National... Projects has reviewed Wickiup Hydro Group, LLC's application for an original license for the Wickiup Dam...

  3. Guidelines for compliance with the National Environmental Policy Act and related environmental review statutes for the development of commercial space launch sites

    DOT National Transportation Integrated Search

    1995-05-01

    The Department of Transportation (DOT) is authorized to regulate and license : U.S. commercial launch activities. Within DOT, the Secretary's authority has : been delegated to the Office of Commercial Space Transportation (OCST). OCST : is responsibl...

  4. 77 FR 40607 - Whitman River Dam, Inc.; Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-10

    ... Dam, Inc.; Notice of Availability of Environmental Assessment In accordance with the National... for an original license for the Crocker Dam Hydroelectric Project, to be located on the Whitman River... Energy Regulatory Commission, 888 First Street, Washington, DC 20426. Please affix ``Crocker Dam...

  5. 76 FR 67178 - Wells Hydroelectric Project; Notice of Availability of the Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2149-152] Wells Hydroelectric Project; Notice of Availability of the Final Environmental Impact Statement for the Wells... application for license for the Wells Hydroelectric Project (FERC No. 2149), located on the Columbia River in...

  6. 76 FR 20657 - Wells Hydroelectric Project; Notice of Availability of the Draft Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2149-152] Wells Hydroelectric Project; Notice of Availability of the Draft Environmental Impact Statement for the Wells... of Energy Projects has reviewed the application for license for the Wells Hydroelectric Project (FERC...

  7. 75 FR 11205 - Entergy Nuclear Operations, Inc; Pilgrim Nuclear Power Station Environmental Assessment and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-10

    ...; Pilgrim Nuclear Power Station Environmental Assessment and Finding of No Significant Impact The U.S... licensee), for operation of Pilgrim Nuclear Power Station (Pilgrim), located in Plymouth County, MA. In... License Renewal of Nuclear Plants: Regarding Pilgrim Nuclear Power Station,'' NUREG-1437, Supplement 29...

  8. 77 FR 22361 - Energy Northwest, Columbia Generating Station; Final Supplement 47 to the Generic Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-13

    ...) solar power; (9) wind power; (10) biomass waste; (11) hydroelectric power; (12) ocean wave and current... Nuclear Plants AGENCY: Nuclear Regulatory Commission. ACTION: Final Supplement 47 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants; issuance. SUMMARY: Notice is hereby given...

  9. 75 FR 14473 - Entergy Nuclear Operations, Inc., Palisades Nuclear Plant; Environmental Assessment and Finding...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-25

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-255; NRC-2010-0127] Entergy Nuclear Operations, Inc., Palisades Nuclear Plant; Environmental Assessment and Finding of No Significant Impact The U.S. Nuclear... Operating License No. DPR-20, issued to Entergy Nuclear Operations, LLC (ENO) (the licensee), for operation...

  10. Driver license testing of young novice drivers : traffic tech.

    DOT National Transportation Integrated Search

    2010-11-01

    Driver license tests are designed to ensure that people using : public roadways have a minimum level of driving skill and : an awareness of safe driving practices and road laws. License : applicants proceed through the administrative processes of : t...

  11. 78 FR 42921 - Amendments to Regulations Governing Ocean Transportation Intermediary Licensing and Financial...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-18

    ... Regulations Governing Ocean Transportation Intermediary Licensing and Financial Responsibility Requirements... the licensing, financial responsibility requirements and duties of Ocean Transportation Intermediaries... effectiveness, improve transparency, streamline processes and reduce regulatory burdens. The Commission received...

  12. Potential environmental effects of energy conservation measures in northwest industries

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Baechler, M C; Gygi, K F; Hendrickson, P L

    The Bonneville Power Administration (Bonneville) has identified 101 plants in the Pacific Northwest that account for 80% of the region's industrial electricity consumption. These plants offer a precise target for a conservation program. PNL determined that most of these 101 plants were represented by 11 major industries. We then reviewed 36 major conservation technologies used in these 11 industrial settings to determine their potential environmental impacts. Energy efficiency technologies designed for industrial use may result in direct or indirect environmental impacts. Effects may result from the production of the conservation measure technology, changes in the working environment due to differentmore » energy and material requirements, or changes to waste streams. Industry type, work-place conditions, worker training, and environmental conditions inside and outside the plant are all key variables that may affect environmental outcomes. To address these issues this report has three objectives: Describe potential conservation measures that Bonneville may employ in industrial programs and discuss potential primary impacts. Characterize industrial systems and processes where the measure may be employed and describe general environmental issues associated with each industry type. Review environmental permitting, licensing, and other regulatory actions required for industries and summarize the type of information available from these sources for further analysis.« less

  13. On the effectiveness of a license scheme for E-waste recycling: The challenge of China and India

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shinkuma, Takayoshi, E-mail: shinkuma@kansai-u.ac.j; Managi, Shunsuke, E-mail: managi@ynu.ac.j

    2010-07-15

    It is well known that China and India have been recycling centers of WEEE, especially printed circuit boards, and that serious environmental pollution in these countries has been generated by improper recycling methods. After the governments of China and India banned improper recycling by the informal sector, improper recycling activities spread to other places. Then, these governments changed their policies to one of promoting proper recycling by introducing a scheme, under which E-waste recycling requires a license issued by the government. In this paper, the effectiveness of that license scheme is examined by means of an economic model. It canmore » be shown that the license scheme can work effectively only if disposers of E-waste have a responsibility to sell E-waste to license holders. Our results run counter to the idea that international E-waste trade should be banned and provide an alternative solution to the problem.« less

  14. 15 CFR 970.101 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES General § 970.101 Definitions. For...

  15. 15 CFR 970.400 - General.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Certification of Applications § 970.400...

  16. 15 CFR 970.2401 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Pre-enactment Exploration § 970.2401...

  17. 15 CFR 970.2401 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Pre-enactment Exploration § 970.2401...

  18. 15 CFR 970.400 - General.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Certification of Applications § 970.400...

  19. 15 CFR 970.101 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES General § 970.101 Definitions. For...

  20. 15 CFR 970.2401 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Pre-enactment Exploration § 970.2401...

  1. 15 CFR 970.101 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES General § 970.101 Definitions. For...

  2. 15 CFR 970.400 - General.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Certification of Applications § 970.400...

  3. 15 CFR 970.101 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES General § 970.101 Definitions. For...

  4. 15 CFR 970.101 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES General § 970.101 Definitions. For...

  5. 15 CFR 970.2401 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Pre-enactment Exploration § 970.2401...

  6. 15 CFR 970.400 - General.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Certification of Applications § 970.400...

  7. 15 CFR 970.400 - General.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Certification of Applications § 970.400...

  8. 15 CFR 970.2401 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Pre-enactment Exploration § 970.2401...

  9. 75 FR 57763 - ILP Effectiveness Evaluation 2010; Supplemental Notice of Multi-Stakeholder Technical Conference...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-22

    ... Integrated Licensing Process (ILP); (2) build on the feedback gathered through personal interviews, by-sector... Licensing Process September 14, 2010. As announced in the May 18, 2010, ``Notice of Interviews...

  10. 15 CFR 970.200 - General.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Applications § 970.200 General. (a) Who...

  11. 15 CFR 970.208 - Fee.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Applications Contents § 970.208 Fee. (a) General...

  12. 15 CFR 970.208 - Fee.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Applications Contents § 970.208 Fee. (a) General...

  13. 15 CFR 970.406 - Fee payment.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Certification of Applications § 970.406...

  14. 15 CFR 970.205 - Vessel safety.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Applications Contents § 970.205 Vessel...

  15. 15 CFR 970.200 - General.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Applications § 970.200 General. (a) Who...

  16. 15 CFR 970.406 - Fee payment.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Certification of Applications § 970.406...

  17. 15 CFR 970.205 - Vessel safety.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Applications Contents § 970.205 Vessel...

  18. 15 CFR 970.205 - Vessel safety.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Applications Contents § 970.205 Vessel...

  19. 15 CFR 970.200 - General.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Applications § 970.200 General. (a) Who...

  20. 15 CFR 970.208 - Fee.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Applications Contents § 970.208 Fee. (a) General...

  1. 15 CFR 970.406 - Fee payment.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Certification of Applications § 970.406...

  2. 32 CFR 651.10 - Actions requiring environmental analysis.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... engineering, laser testing, and electromagnetic pulse generation. (i) Leases, easements, permits, licenses, or... documentation before approving such requests. (l) Projects involving chemical weapons/munitions. ...

  3. 15 CFR 970.208 - Fee.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Applications Contents § 970.208 Fee. (a) General...

  4. 15 CFR 970.507 - Safety at sea.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Issuance/Transfer/Terms, Conditions and...

  5. 15 CFR 970.208 - Fee.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Applications Contents § 970.208 Fee. (a) General...

  6. 15 CFR 970.406 - Fee payment.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Certification of Applications § 970.406...

  7. 15 CFR 970.507 - Safety at sea.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Issuance/Transfer/Terms, Conditions and...

  8. 15 CFR 970.205 - Vessel safety.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Applications Contents § 970.205 Vessel...

  9. 15 CFR 970.205 - Vessel safety.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Applications Contents § 970.205 Vessel...

  10. 15 CFR 970.406 - Fee payment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Certification of Applications § 970.406...

  11. 15 CFR 970.200 - General.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Applications § 970.200 General. (a) Who...

  12. 15 CFR 970.200 - General.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Applications § 970.200 General. (a) Who...

  13. Tobacco industry responsibility for butts: a Model Tobacco Waste Act.

    PubMed

    Curtis, Clifton; Novotny, Thomas E; Lee, Kelley; Freiberg, Mike; McLaughlin, Ian

    2017-01-01

    Cigarette butts and other postconsumer products from tobacco use are the most common waste elements picked up worldwide each year during environmental cleanups. Under the environmental principle of Extended Producer Responsibility, tobacco product manufacturers may be held responsible for collection, transport, processing and safe disposal of tobacco product waste (TPW). Legislation has been applied to other toxic and hazardous postconsumer waste products such as paints, pesticide containers and unused pharmaceuticals, to reduce, prevent and mitigate their environmental impacts. Additional product stewardship (PS) requirements may be necessary for other stakeholders and beneficiaries of tobacco product sales and use, especially suppliers, retailers and consumers, in order to ensure effective TPW reduction. This report describes how a Model Tobacco Waste Act may be adopted by national and subnational jurisdictions to address the environmental impacts of TPW. Such a law will also reduce tobacco use and its health consequences by raising attention to the environmental hazards of TPW, increasing the price of tobacco products, and reducing the number of tobacco product retailers. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/.

  14. Application of the IBERDROLA RETRAN Licensing Methodology to the Confrentes BWR-6 110% Extended Power Uprate

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fuente, Rafael de la; Iglesias, Javier; Sedano, Pablo G.

    IBERDROLA (Spanish utility) and IBERDROLA INGENIERIA (engineering branch) have been developing during the last 2 yr the 110% Extended Power Uprate Project for Cofrentes BWR-6. IBERDROLA has available an in-house design and licensing reload methodology that has been approved in advance by the Spanish Nuclear Regulatory Authority. This methodology has been applied to perform the nuclear design and the reload licensing analysis for Cofrentes cycles 12 and 13 and to develop a significant number of safety analyses of the Cofrentes Extended Power.Because the scope of the licensing process of the Cofrentes Extended Power Uprate exceeds the range of analysis includedmore » in the Cofrentes generic reload licensing process, it has been required to extend the applicability of the Cofrentes RETRAN model to the analysis of new transients. This is the case of the total loss of feedwater (TLFW) transient.The content of this paper shows the benefits of having an in-house design and licensing methodology and describes the process to extend the applicability of the Cofrentes RETRAN model to the analysis of new transients, particularly in this paper the TLFW transient.« less

  15. The Environmental Protection Agency's Safety Standards for Disposal of Spent Nuclear Fuel: Potential Path Forward in Response to the Report of the Blue Ribbon Commission on America's Nuclear Future - 13388

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Forinash, Betsy; Schultheisz, Daniel; Peake, Tom

    2013-07-01

    Following the decision to withdraw the Yucca Mountain license application, the Department of Energy created a Blue Ribbon Commission (BRC) on America's Nuclear Future, tasked with recommending a national strategy to manage the back end of the nuclear fuel cycle. The BRC issued its final report in January 2012, with recommendations covering transportation, storage and disposal of spent nuclear fuel (SNF); potential reprocessing; and supporting institutional measures. The BRC recommendations on disposal of SNF and high-level waste (HLW) are relevant to the U.S. Environmental Protection Agency (EPA), which shares regulatory responsibility with the Nuclear Regulatory Commission (NRC): EPA issues 'generallymore » applicable' performance standards for disposal repositories, which are then implemented in licensing. For disposal, the BRC endorses developing one or more geological repositories, with siting based on an approach that is adaptive, staged and consent-based. The BRC recommends that EPA and NRC work cooperatively to issue generic disposal standards-applying equally to all sites-early in any siting process. EPA previously issued generic disposal standards that apply to all sites other than Yucca Mountain. However, the BRC concluded that the existing regulations should be revisited and revised. The BRC proposes a number of general principles to guide the development of future regulations. EPA continues to review the BRC report and to assess the implications for Agency action, including potential regulatory issues and considerations if EPA develops new or revised generic disposal standards. This review also involves preparatory activities to define potential process and public engagement approaches. (authors)« less

  16. Smart licensing and environmental flows: Modeling framework and sensitivity testing

    NASA Astrophysics Data System (ADS)

    Wilby, R. L.; Fenn, C. R.; Wood, P. J.; Timlett, R.; Lequesne, T.

    2011-12-01

    Adapting to climate change is just one among many challenges facing river managers. The response will involve balancing the long-term water demands of society with the changing needs of the environment in sustainable and cost effective ways. This paper describes a modeling framework for evaluating the sensitivity of low river flows to different configurations of abstraction licensing under both historical climate variability and expected climate change. A rainfall-runoff model is used to quantify trade-offs among environmental flow (e-flow) requirements, potential surface and groundwater abstraction volumes, and the frequency of harmful low-flow conditions. Using the River Itchen in southern England as a case study it is shown that the abstraction volume is more sensitive to uncertainty in the regional climate change projection than to the e-flow target. It is also found that "smarter" licensing arrangements (involving a mix of hands off flows and "rising block" abstraction rules) could achieve e-flow targets more frequently than conventional seasonal abstraction limits, with only modest reductions in average annual yield, even under a hotter, drier climate change scenario.

  17. 76 FR 27114 - Self-Regulatory Organizations; NYSE Arca, Inc.; Notice of Filing and Immediate Effectiveness of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-10

    ... CRD Processing Fee, the NASD Annual System Processing Fee, and the NYSE Arca Transfer/Re-license... Fees, the NASD Annual System Processing Fee, and the NYSE Arca Transfer/Re-license Individual Fee. Fees... Options Regulatory Surveillance Authority (``ORSA'') national market system plan and in doing so shares...

  18. 76 FR 60941 - Policy Regarding Submittal of Amendments for Processing of Equivalent Feed at Licensed Uranium...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-30

    ... State-licensed uranium recovery site, either conventional, heap leach, or in situ recovery. DATES... types of new uranium recovery facilities (conventional mills, heap leach facilities, and in situ... from the ground for processing at a mill. Rather, the ore is processed in-situ with the resulting...

  19. 78 FR 56750 - Interim Staff Guidance on Environmental Issues Associated With New Reactors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-13

    ..., greenhouse gas and climate change, socioeconomics, environmental justice, need for power, alternatives..., Attachment 1--Staff Guidance for Greenhouse Gas and Climate Change Impacts. ML12326A895 ISG-026, Attachment 2... NRC regulatory approval in the form of licensing. Changes in internal staff guidance are not matters...

  20. 77 FR 12333 - Special Nuclear Material License Amendment From Louisiana Energy Services, LLC, for the National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... moderate annual impact on local employment for four more years. Environmental justice impacts are described... significant impact. FOR FURTHER INFORMATION CONTACT: Mary T. Adams, Office of Nuclear Material Safety and... NRC issued a final environmental impact statement (EIS) for the NEF (NUREG-1790) (ML051730238 and...

  1. Development of a Two-Year Associate Arts Degree in Environmental Health Technology.

    ERIC Educational Resources Information Center

    Campbell, Charles R.

    The field of Environmental Health Technology (EHT) encompasses both the equipment and the trained expertise required to utilize land, water, energy, and minerals in the service of human health and welfare. EHT technicians work in disease control, licensing bureaus, hospitals, nursing homes, hazardous waste agencies, and other health agencies. In…

  2. 76 FR 1148 - CRD Hydroelectric LLC, Iowa; Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-07

    ... reviewed the application for an original license for the Red Rock Hydroelectric Project (FERC Project No... Engineers' Red Rock Dam. Staff prepared an environmental assessment (EA), which analyzes the potential... the Public Reference Room or may be viewed on the Commission's Web site at http://www.ferc.gov using...

  3. 78 FR 37210 - Parker Knoll Hydro, LLC; Notice of Environmental Site Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13239-002] Parker Knoll Hydro, LLC; Notice of Environmental Site Review Take notice that the following hydroelectric applications have been filed with Commission and are available for public inspection: a. Type of Application: New Major License. b. Project No.: 13239. c. Date...

  4. 78 FR 37281 - Revisions to Environmental Review for Renewal of Nuclear Power Plant Operating Licenses

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-20

    ... protection regulations by updating the Commission's 1996 findings on the environmental effect of renewing the... effects will be adequately managed. The applicant must demonstrate that the effects of aging will be...; effects of dredging on surface water quality; groundwater use and quality; exposure of terrestrial...

  5. 76 FR 26718 - Gibson Dam Hydroelectric Company, LLC; Notice of Availability of Draft Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-09

    ... Dam Hydroelectric Company, LLC; Notice of Availability of Draft Environmental Assessment In accordance... reviewed the application for license for the Gibson Dam Hydroelectric Project, located at the U.S. Department of the Interior, Bureau of Reclamation's, Gibson dam on the Sun River in Lewis and Clark and Teton...

  6. 10 CFR 51.49 - Environmental report-limited work authorization.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Environmental report-limited work authorization. 51.49... license applying for a limited work authorization under § 50.10(d) of this chapter in a complete application under 10 CFR 2.101(a)(1) through (a)(4), shall submit with its application a separate document...

  7. 10 CFR 51.23 - Temporary storage of spent fuel after cessation of reactor operation-generic determination of no...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Temporary storage of spent fuel after cessation of reactor operation-generic determination of no significant environmental impact. 51.23 Section 51.23 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED...

  8. 10 CFR 51.49 - Environmental report-limited work authorization.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Environmental report-limited work authorization. 51.49... license applying for a limited work authorization under § 50.10(d) of this chapter in a complete application under 10 CFR 2.101(a)(1) through (a)(4), shall submit with its application a separate document...

  9. 14 CFR 1206.402 - Documents available for inspection at NASA Information Centers.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...) Cumulative Index to Selected Speeches and News Releases issued by NASA Headquarters; (7) Index/Digest of... index thereto; (9) Copies of Environmental Impact Statements filed by NASA under the National Environmental Policy Act of 1969; (10) Collection of all issues of “NASA Activities”; (11) List of licenses...

  10. 14 CFR 1206.402 - Documents available for inspection at NASA Information Centers.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...) Cumulative Index to Selected Speeches and News Releases issued by NASA Headquarters; (7) Index/Digest of... index thereto; (9) Copies of Environmental Impact Statements filed by NASA under the National Environmental Policy Act of 1969; (10) Collection of all issues of “NASA Activities”; (11) List of licenses...

  11. 76 FR 60091 - Notice of Availability of Environmental Assessment and Finding of No Significant Impact for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-28

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-407; NRC-2011-0153] Notice of Availability of Environmental Assessment and Finding of No Significant Impact for the University of Utah Nuclear Reactor Facility; Facility Operating License No. R-126 AGENCY: Nuclear Regulatory Commission. ACTION: Notice of...

  12. 75 FR 1655 - Biweekly Notice Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-12

    ... environmental impact statement or environmental assessment need be prepared for these amendments. If the... (ADAMS) Public Electronic Reading Room on the internet at the NRC Web site, http://www.nrc.gov/reading-rm... Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section XI as the source of...

  13. 75 FR 14638 - FirstEnergy Nuclear Operating Company; Perry Nuclear Power Plant; Environmental Assessment and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-26

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-440; NRC-2010-0124] FirstEnergy Nuclear Operating Company; Perry Nuclear Power Plant; Environmental Assessment and Finding of No Significant Impact The U.S...,'' for Facility Operating License No. NPF-58, issued to FirstEnergy Nuclear Operating Company (FENOC, the...

  14. 76 FR 61391 - Biweekly Notice Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-04

    ... methodology identified in Nuclear Energy Institute (NEI) document 04-02, ``Guidance for Implementing a Risk... contained in NRC-approved Nuclear Energy Institute (NEI) 04-10, Revision 1, ``Risk-Informed Technical... CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared for these...

  15. 75 FR 64359 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-19

    ... environmental impact statement or environmental assessment need be prepared for these amendments. If the... authorization to upgrade selected Emergency Action Levels based on Nuclear Energy Institute (NEI) 99-01... of NRC Regulatory Issue Summary 2003-18, Supplement 2, ``Use of Nuclear Energy Institute (NEI) 99-01...

  16. 76 FR 34763 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-14

    ... approved [Nuclear Energy Institute (NEI)] 04-10, Rev. 1 in accordance with the TS SFCP. NEI 04-10, Rev. 1... environmental impact statement or environmental assessment need be prepared for these amendments. If the... by the proposed amendment. The proposed amendment adopts the NRC-accepted guidelines of NEI [Nuclear...

  17. 76 FR 48908 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-09

    .... Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need... provisions of the NRC-approved Cyber Security Plan. The proposed change is consistent with Nuclear Energy...-approved Cyber Security Plan. The proposed change is consistent with Nuclear Energy Institute (NEI) 08-09...

  18. 76 FR 71082 - Strata Energy, Inc., Ross Uranium Recovery Project; New Source Material License Application...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-16

    ...-situ recovery (ISR), also known as in-situ leach, facilities and restoration of the aquifer from which... Supplemental Environmental Impact Statement (SEIS) to the Generic Environmental Impact Statement for In-Situ... located in Crook County, Wyoming, 32 miles northeast of Gillette, Wyoming and 30 miles northwest of...

  19. 78 FR 19330 - Supplemental Environmental Impact Statement for the Ross In-Situ Uranium Recovery Project in...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-29

    ... Ross In-Situ Uranium Recovery Project in Crook County, Wyoming AGENCY: Nuclear Regulatory Commission... Commission (NRC) for a new source materials license for the proposed Ross In-Situ Uranium Recovery (ISR... SEIS is Supplement 5 to NUREG-1910, ``Generic Environmental Impact Statement for In-Situ Leach Uranium...

  20. 15 CFR 970.800 - General.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Safety of Life and Property at Sea § 970...

  1. 15 CFR 970.800 - General.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Safety of Life and Property at Sea § 970...

  2. 15 CFR 970.800 - General.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Safety of Life and Property at Sea § 970...

  3. 15 CFR 970.800 - General.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Safety of Life and Property at Sea § 970...

  4. 15 CFR 970.800 - General.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Safety of Life and Property at Sea § 970...

  5. 77 FR 60039 - Non-Power Reactor License Renewal

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-02

    ... NUCLEAR REGULATORY COMMISSION 10 CFR Part 50 [NRC-2011-0087] RIN 3150-AI96 Non-Power Reactor... the final regulatory basis for rulemaking to streamline non-power reactor license renewal. This final... Reactor (RTR) License Renewal Process. This contemplated rulemaking also recommends conforming changes to...

  6. An Australasian model license reassessment procedure for identifying potentially unsafe drivers.

    PubMed

    Fildes, Brian N; Charlton, Judith; Pronk, Nicola; Langford, Jim; Oxley, Jennie; Koppel, Sjaanie

    2008-08-01

    Most licensing jurisdictions in Australia currently employ age-based assessment programs as a means to manage older driver safety, yet available evidence suggests that these programs have no safety benefits. This paper describes a community referral-based model license re assessment procedure for identifying and assessing potentially unsafe drivers. While the model was primarily developed for assessing older driver fitness to drive, it could be applicable to other forms of driver impairment associated with increased crash risk. It includes a three-tier process of assessment, involving the use of validated and relevant assessment instruments. A case is argued that this process is a more systematic, transparent and effective process for managing older driver safety and thus more likely to be widely acceptable to the target community and licensing authorities than age-based practices.

  7. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berman, M.; Boyack, K.; VanDevender, J.P.

    Prosperity Games are an outgrowth and adaptation of move/countermove and seminar War Games. Prosperity Games are simulations that explore complex issues in a variety of areas including economics, politics, sociology, environment, education and research. These issues can be examined from a variety of perspectives ranging from a global, macroeconomic and geopolitical viewpoint down to the details of customer/supplier/market interactions in specific industries. All Prosperity Games are unique in that both the game format and the player contributions vary from game to game. This report documents the Environmental Prosperity Game conducted under the sponsorship of the Silicon Valley Environmental Partnership. Playersmore » were drawn from all stakeholders involved in environmental technologies including small and large companies, government, national laboratories, universities, environmentalists, the legal profession, finance, and the media. The primary objectives of this game were to: investigate strategies for developing a multi-agency (national/state/regional), one-step regulatory approval process for certifying and implementing environmental technologies and evaluating the simulated results; identify the regulatory hurdles and requirements, and the best approaches for surmounting them; identify technical problems and potential resources (environmental consultants, labs, universities) for solving them. The deliberations and recommendations of these players provided valuable insights as to the views of this diverse group of decision makers concerning environmental issues, including the development, licensing, and commercialization of new technologies.« less

  8. 76 FR 29240 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-20

    ...-283-7681. EIS No. 20110150, Final EIS, DOE, ID, ADOPTION--Areva Eagle Rock Enrichment Facility... Uranium Enrichment Facility, Construction, Operation, and Decommission, License Issuance, Piketon, OH...

  9. Advanced planning surveys using automatic license plate reading equipment and evaluation of automatic license plate reading equipment for advanced planning

    DOT National Transportation Integrated Search

    1998-05-01

    Recent technological advances in computer hardware, software, and image processing have led to the development of automated license plate reading equipment. This equipment has primarily been developed for enforcement and security applications, such a...

  10. 78 FR 62322 - Hydropower Regulatory Efficiency Act of 2013; Notice of Rescheduled Two-Year Licensing Process...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-16

    ... at non-powered dams and closed-loop pumped storage projects in compliance with section 6 of the... process for licensing hydropower development at non-powered dams and closed-loop pumped storage projects...-powered dam versus closed- loop pumped storage) affect the steps included in a two-year process? 3.9...

  11. Mortality for chronic-degenerative diseases in Tuscany: Ecological study comparing neighboring areas with substantial differences in environmental pollution.

    PubMed

    Marabotti, Claudio; Piaggi, Paolo; Scarsi, Paolo; Venturini, Elio; Cecchi, Romina; Pingitore, Alessandro

    2017-06-19

    Environmental pollution is associated with morbidity and mortality for chronic-degenerative diseases. Recent data points out a relationship between proximity to industrial plants and mortality due to neoplasms. The aim of this study has been to compare mortality due to chronic-degenerative diseases in the area of Tuscany (Bassa Val di Cecina), Italy, characterized by the presence of 2 neighboring municipalities similar in terms of size but with substantial differences in industrial activities: Rosignano (the site of chemical, energy production and waste processing industries) and Cecina (with no polluting activity). Standardized mortality rates for the 2001-2010 decade were calculated; the data of the whole Tuscany was assumed as reference. Environmental levels of pollutants were obtained by databases of the Environmental Protection Agency of Tuscany Region (Agenzia Regionale per la Protezione Ambientale della Toscana - ARPAT). Maximum tolerated pollutant levels set by national laws were assumed as reference. In the whole Bassa Val di Cecina, significantly elevated standardized mortality rates due to mesothelioma, ischemic heart diseases, cerebrovascular diseases and Alzheimer and other degenerative diseases of nervous system were observed. In the municipality of Rosignano, a significant excess of mortality for all these groups of diseases was confirmed. On the contrary, the municipality of Cecina showed only significantly higher mortality rates for ischemic heart diseases. Elevated levels of heavy metals in sea water and of particulate matter which contains particles of diameter ≤ 10 mm (PM10) and ozone in air were detected in Rosignano. This study shows an excess of mortality for chronic-degenerative diseases in the area with elevated concentration of polluting factories. Proximity to industrial plants seems to represent a risk factor for those diseases. Int J Occup Med Environ Health 2017;30(4):641-653. This work is available in Open Access model and licensed under a CC BY-NC 3.0 PL license.

  12. 15 CFR 970.2402 - Notice of pre-enactment exploration.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Pre... Director, Office of Ocean Minerals and Energy, National Oceanic and Atmospheric Administration, Department...

  13. 15 CFR 970.2402 - Notice of pre-enactment exploration.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Pre... Director, Office of Ocean Minerals and Energy, National Oceanic and Atmospheric Administration, Department...

  14. 15 CFR 970.2402 - Notice of pre-enactment exploration.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Pre... Director, Office of Ocean Minerals and Energy, National Oceanic and Atmospheric Administration, Department...

  15. 15 CFR 970.2402 - Notice of pre-enactment exploration.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Pre... Director, Office of Ocean Minerals and Energy, National Oceanic and Atmospheric Administration, Department...

  16. 15 CFR 970.2402 - Notice of pre-enactment exploration.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Pre... Director, Office of Ocean Minerals and Energy, National Oceanic and Atmospheric Administration, Department...

  17. 43 CFR 2920.2-1 - Discussion of proposals.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... in conformance with Bureau of Land Management policies and programs for the lands, local zoning... requirements; associated clearances, other permits or licenses which may be required; environmental and...

  18. 32 CFR 651.10 - Actions requiring environmental analysis.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... engineering, laser testing, and electromagnetic pulse generation. (i) Leases, easements, permits, licenses, or..., loans, or other forms of funding such as Government-Owned, Contractor-Operated (GOCO) industrial plants...

  19. 32 CFR 651.10 - Actions requiring environmental analysis.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... engineering, laser testing, and electromagnetic pulse generation. (i) Leases, easements, permits, licenses, or..., loans, or other forms of funding such as Government-Owned, Contractor-Operated (GOCO) industrial plants...

  20. 32 CFR 651.10 - Actions requiring environmental analysis.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... engineering, laser testing, and electromagnetic pulse generation. (i) Leases, easements, permits, licenses, or..., loans, or other forms of funding such as Government-Owned, Contractor-Operated (GOCO) industrial plants...

Top