  1. Environmental Management Assessment of the Fernald Environmental Management Project (FEMP)

    SciTech Connect

    Not Available

    1993-04-01

    This report documents the results of the Environmental Management Assessment performed at the Fernald Environmental Management Project (FEMP) in Fernald, Ohio. During this assessment, the activities conducted by the assessment team included review of internal documents and reports from previous audits and assessments; interviews with US Department of Energy (DOE) and FEMP contractor personnel; and inspection and observation of selected facilities and operations. The onsite portion of the assessment was conducted from March 15 through April 1, 1993, by DOE`s Office of Environmental Audit (EH-24) located within the Office of the Assistant Secretary for Environment, Safety, and Health (EH-1). EH-24 carries out independent assessments of DOE facilities and activities as part of the EH-1 Environment, Safety, and Health (ES&H) Oversight Audit Program. The EH-24 program is designed to evaluate the status of DOE facilities and activities with respect to compliance with Federal, state, and local environmental laws and regulations; compliance with DOE Orders, Guidance and Directives; conformance with accepted industry practices and standards of performance; and the status and adequacy of management systems developed to address environmental requirements. The Environmental Management Assessment of FEMP focused on the adequacy of environmental management systems. Further, in response to requests by the Office of Environmental Restoration and Waste Management (EM) and Fernald Field Office (FN), Quality Assurance and Environmental Radiation activities at FEMP were evaluated from a programmatic standpoint. The results of the evaluation of these areas are contained in the Environmental Protection Programs section in this report.

  2. Project Management Plan for the Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Shipler, D.B.

    1992-03-01

    This Project Management Plan (PMP) describes the approach that will be used to manage the Hanford Environmental Dose Reconstruction (HEDR) Project. The plan describes the management structure and the technical and administrative control systems that will be used to plan and control the HEDR Project performance. The plan also describes the relationship among key project participants: Battelle, the Centers for Disease Control (CDC), and the Technical Steering Panel (TSP).

  3. Project Management Plan for the Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Shipler, D.B.

    1992-03-01

    This Project Management Plan (PMP) describes the approach that will be used to manage the Hanford Environmental Dose Reconstruction (HEDR) Project. The plan describes the management structure and the technical and administrative control systems that will be used to plan and control the HEDR Project performance. The plan also describes the relationship among key project participants: Battelle, the Centers for Disease Control (CDC), and the Technical Steering Panel (TSP).

  4. Project Management Plan for the Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Shipler, D.B.; McMakin, A.H.; Finch, S.M.

    1992-09-01

    This Project Management Plan (PMP) describes the approach being used to manage the Hanford Environmental Dose Reconstruction (HEDR) Project. The plan describes the management structure and the technical and administrative control systems used to plan and control HEDR Project performance. The plan also describes the relationship among key project participants: Battelle, the Centers for Disease control (CDC), and the Technical Steering Panel (TSP). Battelle's contract with CDC only extends through May 1994 when the key technical work will be completed. There-fore, this plan is focused only on the period during which Battelle is a participant.

  5. Project Management Plan for the Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Shipler, D.B.; McMakin, A.H.; Finch, S.M.

    1992-09-01

    This Project Management Plan (PMP) describes the approach being used to manage the Hanford Environmental Dose Reconstruction (HEDR) Project. The plan describes the management structure and the technical and administrative control systems used to plan and control HEDR Project performance. The plan also describes the relationship among key project participants: Battelle, the Centers for Disease control (CDC), and the Technical Steering Panel (TSP). Battelle`s contract with CDC only extends through May 1994 when the key technical work will be completed. There-fore, this plan is focused only on the period during which Battelle is a participant.

  6. HISPANIC ENVIRONMENTAL AND WASTE MANAGEMENT OUTREACH PROJECT

    SciTech Connect

    Sebastian Puente

    1998-07-25

    The Department of Energy Office of Environmental Management (DOE-EM) in cooperation with the Self Reliance Foundation (SRF) is conducting the Hispanic Environmental and Waste Management Outreach Project (HEWMO) to increase science and environmental literacy, specifically that related to nuclear engineering and waste management in the nuclear industry, among the US Hispanic population. The project will encourage Hispanic youth and young adults to pursue careers through the regular presentation of Spanish-speaking scientists and engineers and other role models, as well as career information on nationally broadcast radio programs reaching youth and parents. This project will encourage making science, mathematics, and technology a conscious part of the everyday life experiences of Hispanic youth and families. The SRF in collaboration with the Hispanic Radio Network (HRN) produces and broadcasts radio programs to address the topics and meet the objectives as outlined in the Environmental Literacy Plan and DOE-EM Communications Plan in this document. The SRF has in place a toll-free ''800'' number Information and Resource Referral (I and RR) service that national radio program listeners can call to obtain information and resource referrals as well as give their reactions to the radio programs that will air. HRN uses this feature to put listeners in touch with local organizations and resources that can provide them with further information and assistance on the related program topics.

  7. The Environmental Management Project Manager`s Handbook for improved project definition

    SciTech Connect

    1995-02-01

    The United States Department of Energy (DOE) is committed to providing high quality products that satisfy customer needs and are the associated with this goal, DOE personnel must possess the knowledge, skills, and abilities to ensure successful job performance. In addition, there must be recognition that the greatest obstacle to proper project performance is inadequate project definition. Without strong project definition, DOE environmental management efforts are vulnerable to fragmented solutions, duplication of effort, and wastes resources. The primary means of ensuring environmental management projects meet cost and schedule milestones is through a structured and graded approach to project definition, which is the focus of this handbook.

  8. Criticality accident alarm system at the Fernald Environmental Management Project

    SciTech Connect

    Marble, R.C.; Brown, T.D.; Wooldridge, J.C.

    1994-12-31

    This paper describes the staus of the Fernald Environmental Management Project (FEMP) criticality alarm system. A new radiation detection alarm system was installed in 1990. The anunciation system, calibration and maintenance, and detector placement is described.

  9. Environmental management plan (EMP) for Melamchi water supply project, Nepal.

    PubMed

    Khadka, Ram B; Khanal, Anil B

    2008-11-01

    More than 1.5 million people live in the Kathmandu valley. The valley is facing an extreme shortage of water supply. At the same time the demand is escalating rapidly. To address this issue of scarcity of water, the government of Nepal has proposed a project of inter-basin transfer of water from Melamchi River located 40 km north-east of the Kathmandu valley. The project will cover two districts and three municipalities and will potentially have significant impacts on the environment. In accordance with the Environmental Protection Regulation of Nepal (1997), the Melamchi Water Supply Project (MWSP) has undergone an EIA during the feasibility study stage of the proposed project. The recommendations contained in the EIA were integrated into the project design for implementation in 2006. This paper summarizes the background of MWSP, the environmental concerns described in the EIA and the status of Environmental Management Plan (EMP) developed to address environmental compliance and other issues involving participation and support of the local people. This paper also provides some lessons to learn on the modalities of addressing the demands and grievances of the local people concerning environmental management.

  10. Ashtabula Environmental Management Project Main Extrusion Plant Demolition Project. Demolition of the Ashtabula Environmental Management Project's Main Extrusion Plant

    SciTech Connect

    Colborn, Kurt; Johnson, Kathryn K.

    2003-02-27

    Significant progress was made this year toward closure of the Department of Energy's Ashtabula Environmental Management Project (AEMP) with the demolition of the 9-building Main Extrusion Plant Complex. The 44,000 square foot building complex formerly housed uranium extrusion facilities and equipment. At the start of the project in October of 2001, the buildings still contained a RCRA Part B storage area, operating mixed waste treatment facilities, active waste shredding and compacting process areas, and a state EPA permitted HEPA ventilation system. This paper presents a discussion of the multidisciplinary effort to bring the building to a safe shutdown condition in just six months, including relocation of existing process areas, utility isolation, and preliminary decontamination. Also discussed is the demolition strategy in which portions of the facility remained active while demolition was proceeding in other areas. Other details of the technical approach to the demolition are also discussed, including innovative techniques for demolition, galbestos removal, contamination control, and waste minimization. These techniques contributed to the early completion of demolition in July of 2002, fully two months ahead of schedule and $1.5 million under budget.

  11. Fernald Environmental Management Project 1995 site environmental report summary

    SciTech Connect

    1996-06-01

    This report summarizes the 1995 Site Environmental Report for the Fernald site. It describes the Fernald site mission, exposure pathways, and environmental standards and guidelines. An overview is presented of the impact these activities have on the local environment and public health. Environmental monitoring activities measure and estimate the amount of radioactive and nonradioactive materials that may leave the site and enter the surrounding environment.

  12. Fernald Environmental Management Project 1995 site environmental report

    SciTech Connect

    1996-06-01

    The Fernald site continues to examine the air and liquid pathways as possible routes through which pollutants from past operations and current remedial activities may leave the site. This 1995 Site Environmental Report provides the general public as well as scientists and engineers with the results from the site`s ongoing Environmental Monitoring Program. Also included in this report is information concerning the site`s progress toward achieving full compliance with requirements set forth by DOE, US Environmental Protection Agency (USEPA), and Ohio EPA.

  13. Management of the Atmosphere Resource Recovery and Environmental Monitoring Project

    NASA Technical Reports Server (NTRS)

    Roman, Monsi; Perry, Jay; Howard, David

    2013-01-01

    The Advanced Exploration Systems Program's Atmosphere Resource Recovery and Environmental Monitoring (ARREM) project is working to further optimize atmosphere revitalization and environmental monitoring system architectures. This paper discusses project management strategies that tap into skill sets across multiple engineering disciplines, projects, field centers, and industry to achieve the project success. It is the project's objective to contribute to system advances that will enable sustained exploration missions beyond Lower Earth Orbit (LEO) and improve affordability by focusing on the primary goals of achieving high reliability, improving efficiency, and reducing dependence on ground-based logistics resupply. Technology demonstrations are achieved by infusing new technologies and concepts with existing developmental hardware and operating in a controlled environment simulating various crewed habitat scenarios. The ARREM project's strengths include access to a vast array of existing developmental hardware that perform all the vital atmosphere revitalization functions, exceptional test facilities to fully evaluate system performance, and a well-coordinated partnering effort among the NASA field centers and industry partners to provide the innovative expertise necessary to succeed.

  14. Environmental management compliance reengineering project, FY 1997 report

    SciTech Connect

    VanVliet, J.A.; Davis, J.N.

    1997-09-01

    Through an integrated reengineering effort, the Idaho National Engineering and Environmental Laboratory (INEEL) is successfully implementing process improvements that will permit safe and compliant operations to continue during the next 5 years, even though $80 million was removed from the Environmental Management (EM) program budget. A 2-year analysis, design, and implementation project will reengineer compliance-related activities and reduce operating costs by approximately $17 million per year from Fiscal Year (FY) 1998 through 2002, while continuing to meet the INEEL`s environment, safety, and health requirements and milestone commitments. Compliance reengineer`s focus is improving processes, not avoiding full compliance with environmental, safety, and health laws. In FY 1997, compliance reengineering used a three-phase approach to analyze, design, and implement the changes that would decrease operating costs. Implementation for seven specific improvement projects was completed in FY 1997, while five projects will complete implementation in FY 1998. During FY 1998, the three-phase process will be repeated to continue reengineering the INEEL.

  15. Richland Environmental Restoration Project management action process document

    SciTech Connect

    1996-04-01

    This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines.

  16. 1995 annual epidemiologic surveillance report for Fernald Environmental Management Project

    SciTech Connect

    1995-12-31

    The US Department of Energy's (DOE) commitment to assuring the health and safety of its workers includes the conduct of epidemiologic surveillance activities that provide an early warning system for health problems among workers. During the past several years, a number of DOE sites have participated in the Epidemiologic Surveillance Program. This program monitors illnesses and health conditions that result in an absence of five or more consecutive workdays, occupational injuries and illnesses, and disabilities and deaths among current workers. This report provides a summary of epidemiologic surveillance data collected from the Fernald Environmental Management Project (FEMP) from January 1, 1995 through December 31, 1995. The data were collected by a coordinator at FEMP and submitted to the Epidemiologic Surveillance Data Center, located at Oak Ridge Institute for Science and Education, where quality control procedures and data analyses were carried out.

  17. Remediation activities at the Fernald Environmental Management Project (FEMP)

    SciTech Connect

    Walsh, T.J.; Danner, R.

    1996-07-01

    The Fernald Environmental Management Project (FEMP) is a United States Department of Energy (DOE) facility located in southwestern Ohio. The facility began manufacturing uranium products in the early 1950`s and continued processing uranium ore concentrates until 1989. The facility used a variety of chemical and metallurgical processes to produce uranium metals for use at other DOE sites across the country. Since the facility manufactured uranium metals for over thirty years, various amounts of radiological contamination exists at the site. Because of the chemical and metallurgical processes employed at the site, some hazardous wastes as defined by the Resource Conservation and Recovery Act (RCRA) were also generated at the site. In 1989. the FEMP was placed on the National Priorities List (NPL) requiring cleanup of the facility`s radioactive and chemical contamination under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). This paper discusses the proposed remediation activities at the five Operable Units (OUs) designated at the FEMP. In addition, the paper also examines the ongoing CERCLA response actions and RCRA closure activities at the facility.

  18. Managing environmental issues during international electric power project development

    SciTech Connect

    Cooper, H.W.

    1998-07-01

    Responsible international project developers most often view environmental matters with quite mixed emotions. Those with whom Dynalytics has worked would certainly never contemplate jeopardizing the health of anyone in the world. But while they want their projects realized, and are willing to implement reasonable requirements, they are often asked to do more than is appropriate, more than is technologically possible, and more than is financially possible. The paper discusses the following: who is in charge of environmental matters; whose environmental standards apply; the role of technology; accelerating timetables and reducing costs; documentation and applications; and post-construction requirements.

  19. The Department of Energy, Office of Environmental Restoration and Waste Management: Project performance study

    SciTech Connect

    Not Available

    1993-11-01

    The Office of Environmental Restoration and Waste Management (EM) of the US Department of Energy commissioned Independent Project Analysis, Inc. (IPA) to perform this Project Performance Study to provide a quantitative analysis determining how well EM develops and executes environmental remediation and waste management projects. The approach consisted of collecting detailed data on a sample of 65 completed and ongoing EM projects conducted since 1984. These data were then compared with key project characteristics and outcomes from 233 environmental remediation projects (excluding EM) in IPA`s Environmental Remediation Database and 951 projects In IPA`s Capital Projects Database. The study establishes the standing of the EM system relative to other organizations, and suggests areas and opportunities for improvement.

  20. Project Management Plan for the Hawaii Geothermal Project Environmental Impact Statement

    SciTech Connect

    Reed, R.M.; Saulsbury, J.W.

    1993-06-01

    In 1990, Congress appropriated $5 million (Pu 101-514) for the State of Hawaii to use in Phase 3 of the Hawaii Geothermal Project (HGP). As defined by the State in its 1990 proposal to Congress, the HGP would consist of four phases: (1) exploration and testing of the geothermal resource associated with the Kilauea Volcano on the Island of Hawaii (the Big Island), (2) demonstration of deep-water power transmission cable technology in the Alenuihaha Channel between the Big Island and Maui, (3) verification and characterization of the geothermal resource on the Big Island, and (4) construction and operation of commercial geothermal power production facilities on the Big Island, with overland and submarine transmission of electricity from the Big Island to Oahu and possibly other islands (DBED 1990). Because it considered Phase 3 to be research and not project development or construction, Congress indicated that allocation of this funding would not be considered a major federal action under NEPA and would not require an EIS. However, because the project is highly visible, somewhat controversial, and involves a particularly sensitive environment in Hawaii, Congress directed in 1991 (House Resolution 1281) that ''...the Secretary of Energy shall use such sums as are necessary from amounts previously provided to the State of Hawaii for geothermal resource verification and characterization to conduct the necessary environmental assessments and/or environmental impact statement (EIS) for the geothermal initiative to proceed''. In addition, the U.S. District Court of Hawaii (Civil No. 90-00407, June 25, 1991) ruled that the federal government must prepare an EIS for Phases 3 and 4 before any further disbursement of funds was made to the State for the HGP. This Project Management Plan (PMP) briefly summarizes the background information on the HGP and describes the project management structure, work breakdown structure, baseline budget and schedule, and reporting procedures

  1. Draft West Valley Demonstration Project Waste Management Environmental Impact Statement

    SciTech Connect

    N /A

    2003-05-16

    As part of its ongoing West Valley Demonstration Project (WVDP), and in accordance with the West Valley Demonstration Project Act and previous U.S. Department of Energy (DOE or the Department) decisions, DOE proposes to: (1) Continue onsite management of high-level radioactive waste (HLW) until it can be shipped for disposal to a geologic repository (assumed for the purposes of analysis to be the proposed Yucca Mountain Repository near Las Vegas, Nevada), (2) Ship low-level radioactive waste (LLW) and mixed (radioactive and hazardous) LLW offsite for disposal at DOE or other disposal sites, (3) Ship transuranic (TRU) radioactive waste to the Waste Isolation Pilot Plant (WIPP), and (4) Actively manage the waste storage tanks. The waste volumes that are the subject of evaluation in this EIS include only those wastes that are either currently in storage or that would be generated over the next 10 years from ongoing operations and decontamination activities. This EIS analyzes activities that would occur during a 10-year period.

  2. Environmental management requirements/defensible costs project. Final report

    SciTech Connect

    1996-02-01

    Lockheed Idaho Technologies Company (LITCO) used a systems engineering approach to develop the first formal requirements baseline for Idaho National Engineering Laboratory (INEL) Environmental Management (EM) Programs. The recently signed Settlement Agreement with the State of Idaho (Batt Agreement), along with dramatically reduced EM funding targets from Department of Energy (DOE) headquarters, drove the immediacy of this effort. Programs have linked top-level requirements to work scope to cost estimates. All EM work, grouped by decision units, was scrubbed by INEL EM programs and by an independent {open_quotes}Murder Board.{close_quotes} Direct participation of upper level management from LITCO and the DOE-Idaho Operations Office ensured best information and decisions. The result is a scrubbed down, defensible budget tied to top-level requirements for use in the upcoming DOE-Headquarters` budget workout, the Internal Review Board, the FY98 Activity Data Sheets submittal, and preparation of the FY97 control accounts and out-year plans. In addition to the remarkable accomplishments during the past eight weeks, major issues were identified and documented and follow-on tasks are underway which will lead to further improvements in INEL EM program management.

  3. Integrating removal actions and remedial actions: Soil and debris management at the Fernald Environmental Management Project

    SciTech Connect

    Goidell, L.C.; Hagen, T.D.; Strimbu, M.J.; Dupuis-Nouille, E.M.; Taylor, A.C.; Weese, T.E.; Yerace, P.J.

    1996-02-01

    Since 1991, excess soil and debris generated at the Fernald Environmental management Project (FEMP) have been managed in accordance with the principles contained in a programmatic Removal Action (RvA) Work Plan (WP). This plan provides a sitewide management concept and implementation strategy for improved storage and management of excess soil and debris over the period required to design and construct improved storage facilities. These management principles, however, are no longer consistent with the directions in approved and draft Records of Decision (RODs) and anticipated in draft RODs other decision documents. A new approach has been taken to foster improved management techniques for soil and debris that can be readily incorporated into remedial design/remedial action plans. Response, Compensation and Liability Act (CERCLA) process. This paper describes the methods that were applied to address the issues associated with keeping the components of the new work plan field implementable and flexible; this is especially important as remedial design is either in its initial stages or has not been started and final remediation options could not be precluded.

  4. The Contribution of Project Environmental Assessment to Assessing and Managing Cumulative Effects: Individually and Collectively Insignificant?

    NASA Astrophysics Data System (ADS)

    Noble, Bram; Liu, Jialang; Hackett, Paul

    2017-04-01

    This paper explores the opportunities and constraints to project-based environmental assessment as a means to support the assessment and management of cumulative environmental effects. A case study of the hydroelectric sector is used to determine whether sufficient information is available over time through project-by-project assessments to support an adequate understanding of cumulative change. Results show inconsistency from one project to the next in terms of the components and indicators assessed, limited transfer of baseline information between project assessments over time, and the same issues and concerns being raised by review panels-even though the projects reviewed are operating in the same watershed and operated by the same proponent. Project environmental assessments must be managed, and coordinated, as part of a larger system of impact assessment, if project-by-project assessments are to provide a meaningful forum for learning and understanding cumulative change. The paper concludes with recommendations for improved project-based assessment practice in support of cumulative effects assessment and management.

  5. Environmental Management

    SciTech Connect

    2014-11-12

    Another key aspect of the NNSS mission is Environmental Management program, which addresses the environmental legacy from historic nuclear weapons related activities while also ensuring the health and safety of present day workers, the public, and the environment as current and future missions are completed. The Area 5 Radioactive Waste Management site receives low-level and mixed low-level waste from some 28 different generators from across the DOE complex in support of the legacy clean-up DOE Environmental Management project. Without this capability, the DOE would not be able to complete the clean up and proper disposition of these wastes. The program includes environmental protection, compliance, and monitoring of the air, water, plants, animals, and cultural resources at the NNSS. Investigation and implementation of appropriate corrective actions to address the contaminated ground water facilities and soils resulting from historic nuclear testing activities, the demolition of abandoned nuclear facilities, as well as installation of ground water wells to identify and monitor the extent of ground water contamination.

  6. Environmental Management

    ScienceCinema

    None

    2016-07-12

    Another key aspect of the NNSS mission is Environmental Management program, which addresses the environmental legacy from historic nuclear weapons related activities while also ensuring the health and safety of present day workers, the public, and the environment as current and future missions are completed. The Area 5 Radioactive Waste Management site receives low-level and mixed low-level waste from some 28 different generators from across the DOE complex in support of the legacy clean-up DOE Environmental Management project. Without this capability, the DOE would not be able to complete the clean up and proper disposition of these wastes. The program includes environmental protection, compliance, and monitoring of the air, water, plants, animals, and cultural resources at the NNSS. Investigation and implementation of appropriate corrective actions to address the contaminated ground water facilities and soils resulting from historic nuclear testing activities, the demolition of abandoned nuclear facilities, as well as installation of ground water wells to identify and monitor the extent of ground water contamination.

  7. Mixed waste management plans at the Fernald Environmental Management Project (FEMP)

    SciTech Connect

    Walsh, T.J.; Sattler, J.M.

    1996-07-01

    The Fernald Environmental Management Project (FEMP) is a United States Department of Energy (DOE) facility located in southwestern Ohio. The facility began production of uranium metal products in the early 1950`s and continued processing of uranium ore concentrates until 1989. The facility used a variety of chemical and metallurgical processes to manufacture uranium metals for use at other DOE sites across the country. Because of the chemical and metallurgical processes employed at the site, some hazardous wastes as defined by the Resource Conservation and Recovery Act (RCRA) were generated during the manufacture of the uranium metal products. Because of uranium metal`s radioactive properties, the hazardous wastes generated at the facility typically contain some radioactivity. Wastes which contain both a hazardous component subject to RCRA regulation and a radioactive component subject to the Atomic Energy Act of 1954 are described as mixed waste. In 1989, the FEMP was placed on the National Priorities List (NPL) requiring cleanup of the facility`s radioactive and chemical contamination under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). This paper examines the regulatory requirements associated with development of the plan used to manage mixed wastes at the FEMP. In addition, the paper discusses the strategies used to integrate the requirements of the Federal Facility Compliance Act (FFCAct) with CERCLA response actions.

  8. 76 FR 21877 - Environmental Management Advisory Board

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-19

    ... expertise in project management, acquisition management, human capital management, environmental management... Environmental Management on a broad range of programmatic issues, including project management and oversight... Environmental Management Advisory Board AGENCY: Department of Energy. ACTION: Notice of call for nominations......

  9. Richland Environmental Restoration Project management action process document

    SciTech Connect

    1996-04-01

    A critical mission of the U.S. Department of Energy (DOE) is the planning, implementation, and completion of environmental restoration programs at DOE facilities. An integral part of this mission involves the safe and cost-effective environmental restoration of the Hanford Site. For over 40 years the Hanford Site supported United States national defense programs, largely through the production of nuclear materials. One legacy of historical Hanford Site operations is a significant waste inventory of radioactive and/or regulated chemical materials. Releases of these materials have, in some cases, contaminated the Hanford Site environment. The DOE Richland Operations Office (RL) is responsible for protecting human health and the environment from potential Hanford Site environmental hazards by identifying, assessing, and mitigating risks posed by contaminated sites.

  10. Environmental Management.

    ERIC Educational Resources Information Center

    Bandhu, Desh, Ed.

    The Indian Environmental Society, in association with the International Programme on Environmental Management Education, organized two seminars on World Environment Day and Environmental Impact Assessment during June 1980. A large number of papers on various aspects of environmental management were presented during the seminars. The papers…

  11. Environmental Management.

    ERIC Educational Resources Information Center

    Bandhu, Desh, Ed.

    The Indian Environmental Society, in association with the International Programme on Environmental Management Education, organized two seminars on World Environment Day and Environmental Impact Assessment during June 1980. A large number of papers on various aspects of environmental management were presented during the seminars. The papers…

  12. A team leadership approach to managing the transition from construction to operations for an environmental project

    SciTech Connect

    Kelly, J.W.

    1994-06-01

    This presentation describes a team approach, at the totalproject level that focused team members with common objectives, for the transition to start-up and operation of the project. The Integrated Management Team (IMT) approach has been successful for this US Department of Energy (DOE) environmental restoration project at the Hanford Site in Richland, Washington. The $53.8-million project will collect, treat, and dispose of low-level mixed waste water discharges from the Hanford Site. Construction is scheduled for completion in September 1994 and facility start-up in June 1995. The project challenge is for leadership that is committed to the transition from construction to operation of the environmental restoration project.

  13. Documenting cost and performance for environmental remediation projects: Department of Energy Office of Environmental Management

    SciTech Connect

    1996-08-08

    The purpose of this DOE guide is to facilitate the use of consistent procedures to document cost and performance information for projects involving the remediation of media contaminated with hazardous and radioactive wastes. It provides remedial action project managers with a standardized set of data to document completed remediation projects. Standardized reporting of data will broaden the utility of the information, increase confidence in the effectiveness of future remedial technologies, and enhance the organization, storage and retrieval of relevant information for future cleanup projects. The foundation for this guide was laid down by the Federal Remediation Technologies Roundtable (FRTR) in their publication, Guide to Documenting Cost and Performance for Remediation Projects, EPA-542-B- 95-002. Member agencies of the FRTR include the US EPA, the US DOD, the US DOE, and the US DOI. All the member agencies are involved in site remediation projects and anticipate following the guidance provided in the above reference. Therefore, there is much to be gained for DOE to be consistent with the other member agencies as it will be easier to compare projects across different agencies and also to learn from the experiences of a wider spectrum of prior completed projects.

  14. Approved CAMU equals faster, better, cheaper remediation at the Fernald Environmental Management Project

    SciTech Connect

    Dupuis-Nouille, E.M.; Goidell, L.C.; Strimbu, M.J.; Nickel, K.A.

    1996-03-01

    A 1,050 acre Corrective Action Management Unit (CAMU) was approved for the Fernald Protection Agency Environmental Management Project (FEMP) by the US Environmental Protection Agency (USEPA) to manage environmental media remediation waste in the Operable Unit 5 Record of Decision, 1995. Debris is also proposed for management as remediation waste under the CAMU Rule in the Operable Unit 3 Remedial Investigation/Feasibility Study (RI/FS) Report, as of December 1995. Application of the CAMU Rule at the FEMP will allow consolidation of low-level mixed waste and hazardous waste that presents minimal threat from these two operable units in an on-property engineered disposal facility without triggering land disposal restrictions (LDRs). The waste acceptance criteria for the on property disposal facility are based on a combination of site-specific risk-based concentration standards, as opposed to non-site-specific requirements imposed by regulatory classifications.

  15. Project Risk Management

    NASA Technical Reports Server (NTRS)

    Jr., R. F. Miles

    1995-01-01

    Project risk management is primarily concerned with performance, reliability, cost, and schedule. Environmental risk management is primarily concerned with human health and ecological hazards and likelihoods. This paper discusses project risk management and compares it to environmental risk management, both with respect to goals and implementation. The approach of the Jet Propulsion Laboratory to risk management is presented as an example of a project risk management approach that is an extension to NASA NHB 7120.5: Management of Major System Programs and Projects.

  16. Project Risk Management

    NASA Technical Reports Server (NTRS)

    Jr., R. F. Miles

    1995-01-01

    Project risk management is primarily concerned with performance, reliability, cost, and schedule. Environmental risk management is primarily concerned with human health and ecological hazards and likelihoods. This paper discusses project risk management and compares it to environmental risk management, both with respect to goals and implementation. The approach of the Jet Propulsion Laboratory to risk management is presented as an example of a project risk management approach that is an extension to NASA NHB 7120.5: Management of Major System Programs and Projects.

  17. 2003 Fernald Environmental Management Project Annual Illness and Injury Surveillance Report, Revised September 2007

    SciTech Connect

    U.S. Department of Energy, Office of Health, Safety and Security, Office of Illness and Injury Prevention Programs

    2007-10-04

    Annual Illness and Injury Surveillance Program report for 2003 for the Fernald Environmental Management Project. The U.S. Department of Energy’s (DOE) commitment to assuring the health and safety of its workers includes the conduct of epidemiologic surveillance activities that provide an early warning system for health problems among workers. The IISP monitors illnesses and health conditions that result in an absence of workdays, occupational injuries and illnesses, and disabilities and deaths among current workers.

  18. Characterization of reproduction and growth of American robins at the Fernald Environmental Management Project, 1991

    SciTech Connect

    Osborne, D.R.; Ambrose, D.M.; Simpson, J.C.

    1992-11-01

    As part of a Biological and Ecological Site Characterization of the Fernald Environmental Management Project (FEMP), suppressed growth in onsite American robin nestlings was discovered in 1987 and in 1990. However, the causal factors relating to suppressed growth were not investigated. This study was initiated to determine if growth suppression still existed, and if so, the possible relationship of FEMP land management practices and soil contaminants through food chains to growth and reproductive fitness. This study was expanded to include five offsite sampling sites, as well as analyses of soils and earthworms for uranium, pesticides/herbicides, and heavy metals.

  19. Advanced Monitoring Systems Initiative Project Achievements for Environmental Restoration and Waste Management

    SciTech Connect

    Hohman, E.H.; Lohrstorfer, C.L.; Venedam, R.J.; Weeks, S.J.; Fannin, C.R.

    2006-07-01

    The Advanced Monitoring Systems Initiative (AMSI) project has been in existence since 2002. In this short time period, AMSI has successfully developed, tested and/or demonstrated over 30 advanced sensors and monitoring systems for applications in environmental restoration, waste management and other areas of national interest. This presentation summarizes the AMSI project, and gives examples of recent successes. The purpose of the presentation is to make Symposium attendees aware of AMSI's capabilities and experience, for possible use in the future. Example successes include the following: - Automated hexavalent chromium (Cr(VI)) monitoring in wells alongside the Columbia River; - Atmospheric chemical sensor array for remote, real-time plume tracking; - Wireless sensor platform for long-term monitoring of subsurface moisture; - Embedded piezo-resistive micro-cantilever (EPM) units for carbon tetrachloride (CCl{sub 4}) and hydrogen cyanide (HCN) detection; - 'iHistorian' for efficient, real-time data management of chemical releases. (authors)

  20. Audit of work force restructuring at the Fernald Environmental Management Project

    SciTech Connect

    1996-04-23

    The Department of Energy (Department) restructured its work force at the Fernald Environmental Management Project (Fernald Project) to reduce staffing levels and to modify the mix of workers` skills in response to budget cuts, facility closures, and changes in the Fernald Project`s mission. The objective of this audit was to determine whether the work force restructurings were effective in reducing staffing levels and in changing the mix of workers` skills. As of September 30, 1995, the restructurings were not effective in reducing staffing levels or in improving the mix of workers` skills. The Fernald Environmental Restoration Management Corporation (FERMCO) spent $2.9 million to separate 255 employees in October 1993. However, by September 30, 1994, all but 14 of the employees separated were either rehired or replaced by new employees with similar skills. The second restructuring began in October 1994 and is not expected to be completed until May 1996. The Department expects the second restructuring to reduce FERMCO`s work force by 476 employees at a cost of $12.9 million. However, since the second restructuring began, FERMCO has hired 265 new employees and at September 30, 1995, had open job announcements seeking 82 additional employees. Many of these new employees have essentially the same skills as employees who separated under the two restructurings. The Department`s objectives were not met because the Fernald Area Office did not (1) require FERMCO to perform the skills analysis necessary to identify which employees were needed to perform the Fernald Project`s current mission, and (2) effectively monitor FERMCO`s restructuring efforts to ensure that the Department`s objectives were met.

  1. Progress report on decommissioning activities at the Fernald Environmental Management Project (FEMP) site

    SciTech Connect

    1998-07-01

    The Fernald Environmental Management Project (FEMP), is located about 18 miles northwest of Cincinnati, Ohio. Between 1953 and 1989, the facility, then called the Feed Material Production Center or FMPC, produced uranium metal products used in the eventual production of weapons grade material for use by other US Department of Energy (DOE) sites. In 1989, FMPC`s production was suspended by the federal government in order to focus resources on environmental restoration versus defense production. In 1992, Fluor Daniel Fernald assumed responsibility for managing all cleanup activities at the FEMP under contract to the DOE. In 1990, as part of the remediation effort, the site was divided into five operable units based on physical proximity of contaminated areas, similar amounts of types of contamination, or the potential for a similar technology to be used in cleanup activities. This report continues the outline of the decontamination and decommissioning (D and D) activities at the FEMP site Operable Unit 3 (OU3) and provides an update on the status of the decommissioning activities. OU3, the Facilities Closure and Demolition Project, involves the remediation of more than 200 uranium processing facilities. The mission of the project is to remove nuclear materials stored in these buildings, then perform the clean out of the buildings and equipment, and decontaminate and dismantle the facilities.

  2. Radiological release criteria at the Fernald Environmental Management Project theory and practice

    SciTech Connect

    Lehrter, R.W.

    1995-01-17

    As environmental restoration activities progress at the DOE`s Fernald site, and across the country, large volumes of radioactive scrap metal (RSM) are being generated. Despite the existence of ``free-release`` guidelines from DOE. The strategy of onsite decontamination and release of RSM for unrestricted use has been generally overlooked in recent years. A pilot project was completed at Fernald in which 120 tons of RSM were decontaminated onsite and released for unrestricted use. This paper compares that strategy to more traditional DOE RSM management practices. Many options exist for managing RSM. DOE orders dictate that contractors demonstrate flexibility in utilizing a combination of techniques to optimize the benefits of waste management activates. The FERMCO Recycling Department led an effort to provide their customer with an economical alternative to the traditional approach of burying contaminated metal as LLW, based on established DOE free-release guidelines.

  3. Environment, safety and health progress assessment of the Fernald Environmental Management Project (FEMP)

    SciTech Connect

    Not Available

    1991-11-01

    This report documents the results of the Environment, Safety, and Health (ES&H) Progress Assessment of the Fernald Environmental Management Project (FEMP), Fernald, Ohio, conducted from October 15 through October 25, 1991. The Secretary of Energy directed that small, focused, ES&H Progress Assessments be performed as part of the continuing effort to institutionalize line management accountability and the self-assessment process in the areas of ES&H. The FEMP assessment is the pilot assessment for this new program. The objectives for the FEMP ES&H Progress Assessment were to assess: (1) how the FEMP has progressed since the 1989 Tiger Assessment; (2) how effectively the FEMP has corrected specific deficiencies and associated root causes identified by that team; and (3) whether the current organization, resources, and systems are sufficient to proactively manage ES&H issues.

  4. Reengineering of Analytical Data Management for the Environmental Restoration Project at Los Alamos National Laboratory

    SciTech Connect

    Bolivar, S.; Dorries, A.; Nasser, K.; Scherma, S.

    2003-02-27

    The Environmental Restoration (ER) Project at Los Alamos National Laboratory (LANL) is responsible for the characterization, clean up, and monitoring of over 2,124 identified potential release sites (PRS). These PRSs have resulted from operations associated with weapons and energy related research which has been conducted at LANL since 1942. To accomplish mission goals, the ER Project conducts field sampling to determine possible types and levels of chemical contamination as well as their geographic extent. Last fiscal year, approximately 4000 samples were collected during ER Project field sampling campaigns. In the past, activities associated with field sampling such as sample campaign planning, paperwork, shipping and analytical laboratory tracking; verification and order fulfillment; validation and data quality assurance were performed by multiple groups working with a variety of software applications, databases and hard copy reports. This resulted in significant management and communication difficulties, data delivery delays, and inconsistent processes; it also represented a potential threat to overall data integrity. Creation of an organization, software applications and a data process that could provide for cost-effective management of the activities and data mentioned above became a management priority, resulting in a development of a reengineering task. This reengineering effort--currently nearing completion--has resulted in personnel reorganization, the development of a centralized data repository, and a powerful web-based sample management system that allows for an appreciably streamlined and more efficient data process. These changes have collectively cut data delivery times, allowed for larger volumes of samples and data to be handled with fewer personnel, and resulted in significant cost savings. This paper will provide a case study of the reengineering effort undertaken by the ER Project of its analytical data management process. It includes

  5. Final West Valley Demonstration Project Waste Management Environmental Impact Statement, Cattaraugus County, West Valley, New York

    SciTech Connect

    N /A

    2004-01-16

    The purpose of the ''Final West Valley Demonstration Project Waste Management Environmental Impact Statement'' is to provide information on the environmental impacts of the Department of Energy's proposed action to ship radioactive wastes that are either currently in storage, or that will be generated from operations over the next 10 years, to offsite disposal locations, and to continue its ongoing onsite waste management activities. Decommissioning or long-term stewardship decisions will be reached based on a separate EIS that is being prepared for that decisionmaking. This EIS evaluates the environmental consequences that may result from actions to implement the proposed action, including the impacts to the onsite workers and the offsite public from waste transportation and onsite waste management. The EIS analyzes a no action alternative, under which most wastes would continue to be stored onsite over the next 10 years. It also analyzes an alternative under which certain wastes would be shipped to interim offsite storage locations prior to disposal. The Department's preferred alternative is to ship wastes to offsite disposal locations.

  6. Technical approach to finalizing sensible soil cleanup levels at the Fernald Environmental Management Project

    SciTech Connect

    Carr, D.; Hertel, B.; Jewett, M.; Janke, R.; Conner, B.

    1996-02-01

    The remedial strategy for addressing contaminated environmental media was recently finalized for the US Department of Energy`s (DOE) Fernald Environmental Management Project (FEMP) following almost 10 years of detailed technical analysis. The FEMP represents one of the first major nuclear facilities to successfully complete the Remedial Investigation/Feasibility Study (RI/FS) phase of the environmental restoration process. A critical element of this success was the establishment of sensible cleanup levels for contaminated soil and groundwater both on and off the FEMP property. These cleanup levels were derived based upon a strict application of Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) regulations and guidance, coupled with positive input from the regulatory agencies and the local community regarding projected future land uses for the site. The approach for establishing the cleanup levels was based upon a Feasibility Study (FS) strategy that examined a bounding range of viable future land uses for the site. Within each land use, the cost and technical implications of a range of health-protective cleanup levels for the environmental media were analyzed. Technical considerations in driving these cleanup levels included: direct exposure routes to viable human receptors; cross- media impacts to air, surface water, and groundwater; technical practicality of attaining the levels; volume of affected media; impact to sensitive environmental receptors or ecosystems; and cost. This paper will discuss the technical approach used to support the finalization of the cleanup levels for the site. The final cleanup levels provide the last remaining significant piece to the puzzle of establishing a final site-wide remedial strategy for the FEMP, and positions the facility for the expedient completion of site-wide remedial activities.

  7. Sound Waste Management Plan environmental operations, and used oil management system: Restoration project 97115. Exxon Valdez oil spill restoration project final report: Volumes 1 and 2

    SciTech Connect

    1998-06-01

    This project constitutes Phase 2 of the Sound Waste Management Plan and created waste oil collection and disposal facilities, bilge water collection and disposal facilities, recycling storage, and household hazardous waste collection and storage, and household hazardous waste collection and storage facilities in Prince William Sound. A wide range of waste streams are generated within communities in the Sound including used oil generated from vehicles and vessels, and hazardous wastes generated by households. This project included the design and construction of Environmental Operations Stations buildings in Valdez, Cordova, Whittier, Chenega Bay and Tatitlek to improve the overall management of oily wastes. They will house new equipment to facilitate oily waste collection, treatment and disposal. This project also included completion of used oil management manuals.

  8. DEPLOYMENT OF THE GUBKA TECHNOLOGY TO STABILIZE RADIOACTIVE STANDARD SOLUTIONS AT THE FERNALD ENVIRONMENTAL MANAGEMENT PROJECT

    SciTech Connect

    Chipman, N.A.; Knecht, D.A.; Meyer, A.; Aloy, A.; Anshits, A.G.; Tretyakov, A.A.

    2003-02-27

    This paper describes the deployment of the Gubka technology to stabilize liquid technical standards at the Fernald Environmental Management Project. Gubka, an open-cell glass crystalline porous material, was developed by a joint research program of Russian Institutes at St. Petersburg, Krasnoyarsk, and Zheleznogorsk and the Idaho National Engineering and Environmental Laboratory. Gubka technology can be applied in an active or a passive method to stabilize a solution. In both methods the result is the same, and the dried components of the solution are sorbed in the pores of the Gubka block while the liquid phase is evaporated. In this deployment Gubka blocks were passively floated in the solutions at ambient conditions. As the solutions evaporated, the non-volatile components were sorbed in the pores of the Gubka blocks. The waste-loaded Gubka blocks have been packaged for transportation and disposal at the Nevada Test site within an existing waste category.

  9. Status of decommissioning activities at the Fernald Environmental Management Project (FEMP) site

    SciTech Connect

    1996-12-31

    The Fernald Environmental Management Project (FEMP) was formally closed and the mission of the facility was officially redirected toward environmental restoration in August 1991. Many of the production facilities and equipment still contained quantities of raw, intermediate, and finished production-related materials. The safe Shutdown program was initiated to remove and properly disposition all nuclear product and in process residue materials, supplies, chemicals, and associated process equipment that was abandoned in place when FEMP stopped production in 1989. As part of the remedial design of the interim remedial action, a schedule for building dismantlement was submitted in June 1995. A 31-year schedule was developed, based on anticipation of reduced funding levels. However, recent cleanup successes at Fernald led to DOE endorsement of greater funding for the final cleanup, accelerating the schedule for Operable Unit 3 dismantlement, reducing the schedule to ten years. Under the accelerated schedule, several plants will be dismantled, starting in 1996.

  10. The GIIDA (Management of the CNR Environmental Data for Interoperability) project

    NASA Astrophysics Data System (ADS)

    Nativi, S.

    2009-04-01

    This work presents the GIIDA (Gestione Integrata e Interoperativa dei Dati Ambientali del CNR) inter-departimental project of the Italian National Research Council (CNR). The project is an initiative of the Earth and Environment Department (Dipartimento Terra e Ambiente) of the CNR. GIIDA mission is "To implement the Spatial Information Infrastructure (SII) of CNR for Environmental and Earth Observation data". The project aims to design and develop a multidisciplinary cyber-infrastructure for the management, processing and evaluation of Earth and environmental data. This infrastructure will contribute to the Italian presence in international projects and initiatives, such as: INSPIRE, GMES, GEOSS and SEIS. The main GIIDA goals are: • Networking: To create a network of CNR Institutes for implementing a common information space and sharing spatial resources. • Observation: Re-engineering the environmental observation system of CNR • Modeling: Re-engineering the environmental modeling system del CNR • Processing: Re-engineering the environmental processing system del CNR • Mediation: To define mediation methods and instruments for implementing the international interoperability standards. The project started in July 2008 releasing a specification document of the GIIDA architecture for interoperability and security. Based on these documents, a Call for Proposals was issued in September 2008. GIIDA received 23 proposed pilots from 16 different Institutes belonging to five CNR Departments and from 15 non-CNR Institutions (e.g. three Italian regional administrations, three national research centers, four universities, some SMEs). These pilot were divided into thematic areas. In fact, GIIDA considers seven main thematic areas/domains: • Biodiversity; • Climate Changes; • Air Quality; • Soil and Water Quality; • Risks; • Infrastructures for Research and Public Administrations; • Sea and Marine resources Each of these thematic areas is covered by a

  11. Feasibility study on consolidation of Fernald Environmental Management Project depleted uranium materials

    SciTech Connect

    1995-11-30

    In 1991, the DOE made a decision to close the FMPC located in Fernald, Ohio, and end its production mission. The site was renamed FEMP to reflect Fernald`s mission change from uranium production to environmental restoration. As a result of this change, the inventory of strategic uranium materials maintained at Fernald by DOE DP will need to be relocated to other DOE sites. Although considered a liability to the Fernald Plant due to its current D and D mission, the FEMP DU represents a potentially valuable DOE resource. Recognizing its value, it may be important for the DOE to consolidate the material at one site and place it in a safe long-term storage condition until a future DOE programmatic requirement materializes. In August 1995, the DOE Office of Nuclear Weapons Management requested, Lockheed Martin Energy Systems (LMES) to assess the feasibility of consolidating the FEMP DU materials at the Oak Ridge Reservation (ORR). This feasibility study examines various phases associated with the consolidation of the FEMP DU at the ORR. If useful short-term applications for the DU fail to materialize, then long-term storage (up to 50 years) would need to be provided. Phases examined in this report include DU material value; potential uses; sampling; packaging and transportation; material control and accountability; environmental, health and safety issues; storage; project management; noneconomic factors; schedule; and cost.

  12. Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Finch, S.M.; McMakin, A.H.

    1992-06-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Battelle Pacific Northwest Laboratories under contract with the Centers for Disease Control. The independent Technical Steering Panel (TSP) provides technical direction. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demography, food consumption, and agriculture; environmental pathways and dose estimates.

  13. Ensuring comparability of data generated by multiple analytical laboratories for environmental decision making at the Fernald Environmental Management Project

    SciTech Connect

    Sutton, C.; Campbell, B.A.; Danahy, R.J.; Dugan, T.A.; Tomlinson, F.K.

    1994-09-01

    The Fernald Environmental Management Project is a US Department of Energy (DOE)-owned facility located 17 miles northwest of Cincinnati, Ohio. From 1952 until 1989, the Fernald site provided high-purity uranium metal products to support US defense programs. In 1989 the mission of Fernald changed from one of uranium production to one of environmental restoration. At Fernald, multiple functional programs require analytical data. Inorganic and organic data for these programs are currently generated by seven laboratories, while radiochemical data are being obtained from six laboratories. Quality Assurance (QA) and Quality Control (QC) programs have been established to help ensure comparability of data generated by multiple laboratories at different times. The quality assurance program for organic and inorganic measurements specifies which analytical methodologies and sample preparation procedures are to be used based on analyte class, sample matrix, and data quality requirements. In contrast, performance specifications have been established for radiochemical analyses. A blind performance evaluation program for all laboratories, both on-site and subcontracted commercial laboratories, provides continuous feedback on data quality. The necessity for subcontractor laboratories to participate in the performance evaluation program is a contractual requirement. Similarly, subcontract laboratories are contractually required to generate data which meet radiochemical performance specifications. The Fernald on-site laboratory must also fulfill these requirements.

  14. A phased approach to cooperative environmental management R&D projects with Russian institutes

    SciTech Connect

    Matalucci, R.V.; Albert, T.E.

    1994-10-01

    An important aspect of technology exchange between the US and the Former Society Union (FSU) countries is the identification and implementation of cooperative projects that are mutually beneficial. The US Department of Energy (DOE) and its national laboratories have established a four-phase approach to identify and further develop Russian technologies that could contribute to solving DOE environmental management problems. Following an initial screening and identification of potential technologies, the country-to-country interaction is formally initiated in the first phase through a small-scale pilot project study. This phase consists of an evaluation of the specific technology for DOE applications, and provides an opportunity for both US and Russian scientists and engineers to validate the use of the technology for a specific DOE requirement. The successful completion of this phase establishes the basis for continuing the technology development into the second phase, which includes laboratory testing in Russia. In the third phase, the technology is laboratory tested in the US, most likely at those DOE national laboratories having the capability and greatest interest in the particular technology area. The fourth and final phase consist of a commercialization process that establishes a partnership with a US business to finalize development of the technology and to prepare for implementation within the DOE complex. An example of this phased approach is a current high-level waste separation cooperative project between the Khlopin Radium Institute and the DOE through Sandia National Laboratories (SNL) and Science Applications International Corporation (SAIC). This effort has not only enhanced separations technology for the DOE, but has also provided an example of a working process for future cooperative projects.

  15. Pilot study risk assessment for selected problems at the Fernald Environmental Management Project (FEMP)

    SciTech Connect

    Hamilton, L.D.; Meinhold, A.F.; Baxter, S.L.; Holtzman, S.; Morris, S.C.; Pardi, R.; Rowe, M.D.; Sun, C.; Anspaugh, L.; Layton, D.

    1993-03-01

    Two important environmental problems at the USDOE Fernald Environmental Management Project (FEMP) facility in Fernald, Ohio were studied in this human health risk assessment. The problems studied were radon emissions from the K-65 waste silos, and offsite contamination of ground water with uranium. Waste from the processing of pitchblende ore is stored in the K-65 silos at the FEMP. Radium-226 in the waste decays to radon gas which escapes to the outside atmosphere. The concern is for an increase in lung cancer risk for nearby residents associated with radon exposure. Monitoring data and a gaussian plume transport model were used to develop a source term and predict exposure and risk to fenceline residents, residents within 1 and 5 miles of the silos, and residents of Hamilton and Cincinnati, Ohio. Two release scenarios were studied: the routine release of radon from the silos and an accidental loss of one silo dome integrity. Exposure parameters and risk factors were described as distributions. Risks associated with natural background radon concentrations were also estimated.

  16. Pilot study risk assessment for selected problems at the Fernald Environmental Management Project (FEMP)

    SciTech Connect

    Hamilton, L.D.; Meinhold, A.F.; Baxter, S.L.; Holtzman, S.; Morris, S.C.; Pardi, R.; Rowe, M.D.; Sun, C. ); Anspaugh, L.; Layton, D. )

    1993-03-01

    Two important environmental problems at the USDOE Fernald Environmental Management Project (FEMP) facility in Fernald, Ohio were studied in this human health risk assessment. The problems studied were radon emissions from the K-65 waste silos, and offsite contamination of ground water with uranium. Waste from the processing of pitchblende ore is stored in the K-65 silos at the FEMP. Radium-226 in the waste decays to radon gas which escapes to the outside atmosphere. The concern is for an increase in lung cancer risk for nearby residents associated with radon exposure. Monitoring data and a gaussian plume transport model were used to develop a source term and predict exposure and risk to fenceline residents, residents within 1 and 5 miles of the silos, and residents of Hamilton and Cincinnati, Ohio. Two release scenarios were studied: the routine release of radon from the silos and an accidental loss of one silo dome integrity. Exposure parameters and risk factors were described as distributions. Risks associated with natural background radon concentrations were also estimated.

  17. Conforth Ranch (Wanaket) Wildlife Mitigation Project : Draft Management Plan and Draft Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration; Confederated Tribes of the Umatilla Reservation, Oregon.

    1995-03-01

    Bonneville Power Administration (BPA) proposes to mitigate for loss of wildlife habitat caused by the development of Columbia River Basin hydroelectric projects, including McNary dam. The proposed wildlife mitigation project involves wildlife conservation on 1140 hectares (ha)(2817 acres) of land (including water rights) in Umatilla County, Oregon. BPA has prepared an Environmental Assessment (EA)(DOE/EA- 1016) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and BPA is issuing this Finding of No Significant Impact (FONSI).

  18. A vadose zone Transport Processes Investigation within the glacial till at the Fernald Environmental Management Project.

    SciTech Connect

    Schwing, J.; Roepke, Craig Senninger; Brainard, James Robert; Glass, Robert John, Jr.; Mann, Michael J. A.; Holt, Robert M.; Kriel, Kelly

    2007-08-01

    This report describes a model Transport Processes Investigation (TPI) where field-scale vadose zone flow and transport processes are identified and verified through a systematic field investigation at a contaminated DOE site. The objective of the TPI is to help with formulating accurate conceptual models and aid in implementing rational and cost effective site specific characterization strategies at contaminated sites with diverse hydrogeologic settings. Central to the TPI are Transport Processes Characterization (TPC) tests that incorporate field surveys and large-scale infiltration experiments. Hypotheses are formulated based on observed pedogenic and hydrogeologic features as well as information provided by literature searches. The field and literature information is then used to optimize the design of one or more infiltration experiments to field test the hypothesis. Findings from the field surveys and infiltration experiments are then synthesized to formulate accurate flow and transport conceptual models. Here we document a TPI implemented in the glacial till vadose zone at the Fernald Environmental Management Project (FEMP) in Fernald, Ohio, a US Department of Energy (DOE) uranium processing site. As a result of this TPI, the flow and transport mechanisms were identified through visualization of dye stain within extensive macro pore and fracture networks which provided the means for the infiltrate to bypass potential aquatards. Such mechanisms are not addressed in current vadose zone modeling and are generally missed by classical characterization methods.

  19. ENVIRONMENTAL MANAGEMENT

    EPA Science Inventory

    This brochure is part of a series of information packages prepared by the United States Environmental Protection Agency (EPA). Aimed at the international community, the packages focus on key environmental and public health issues being investigated by EPA. The products highligh...

  20. ENVIRONMENTAL MANAGEMENT

    EPA Science Inventory

    This brochure is part of a series of information packages prepared by the United States Environmental Protection Agency (EPA). Aimed at the international community, the packages focus on key environmental and public health issues being investigated by EPA. The products highligh...

  1. Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Finch, S.M.; McMakin, A.H.

    1991-01-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Pacific Northwest Laboratory (PNL) under the direction of an independent Technical Steering Panel (TSP). The TSP consists of experts in environmental pathways, epidemiology, surface-water transport, ground-water transport, statistics, demography, agriculture, meteorology, nuclear engineering, radiation dosimetry, and cultural anthropology. Included are appointed technical members representing the states of Oregon and Washington, a representative of Native American tribes, and an individual representing the public. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on human (dose estimates): Source Terms; Environmental Transport; Environmental Monitoring Data; Demographics, Agriculture, Food Habits and; Environmental Pathways and Dose Estimates.

  2. Overview of the Environmental and Water Resources Institute's "Guidelines For Integrated Water Resources Management" Project

    SciTech Connect

    Gerald Sehlke

    2005-03-01

    Integrated Water Resources Management is a systematic approach to optimizing our understanding, control and management of water resources within a basin to meet multiple objectives. Recognition of the need for integrating water resources within basins is not unique to the Environmental and Water Resources Institute’s Integrated Water Resources Management Task Committee. Many individuals, governments and other organizations have attempted to develop holistic water resources management programs. In some cases, the results have been very effective and in other cases, valiant attempts have fallen far short of their initial goals. The intent of this Task Committee is to provide a set of guidelines that discusses the concepts, methods and tools necessary for integrating and optimizing the management of the physical resources and to optimize and integrate programs, organizations, infrastructure, and socioeconomic institutions into comprehensive water resources management programs.

  3. TRANSFORMING THE SRS ENVIRONMENTAL BUSINESS: COMMUNICATION AND APPLIED PROJECT MANAGEMENT PRINCIPLES

    SciTech Connect

    Saldivar, E.

    2010-01-20

    A process for communicating information relating to core business functions that also encourages improving internal communications has been established at SRS. This process continues to grow and strengthen as the multiple Contractors, Regulators and DOE-SR relationships mature. A number of management communication tools have been initiated, retooled, rebooted or continued with enhancements to ensure appropriate information is communicated to all levels with environmental responsibility at SRS. The types of information that are the focus of this improved process are feedback from the customer and from informational exchange forums (i.e., Challenge Opportunity and Resolution (COR), SRS Regulatory Integration Team (SRIT), Environmental Quality Management Division (EQMD), Senior Environmental Managers Council (SEMC), etc.). These forums, SRS environmental functions centralization, and the creation of a Regulatory Integration process allows for cross-functional decision making, problem solving and information sharing that involves the field organizations, Environmental Compliance Authorities (ECA), Subject Matter Experts (SME), DOE and the Regulators. Numerous examples of effective decision-making and problem solving will be shared. Lessons Learned involving inadequate communications and the resulting impacts on the environment, customer satisfaction, and relationships will also be discussed. Additionally, the focus on improved communications also includes maintaining awareness of business activities. The tools being utilized to facilitate the continuing improvement of internal communications include weekly staff meetings for all individuals within the organization, quarterly ECA and SME meeting, quarterly Regulatory Integration & Environmental Services (RI&ES) All-Hands meetings hosted by the Director, bi-weekly EQMD and EQMD Lite meetings with the customer, bi-annual SRIT meetings, and COR meetings on an as need basis. In addition, an existing Required Reading Program

  4. ENVIRONMENTAL MANAGEMENT SCIENCE PROGRAM RESEARCH PROJECTS TO IMPROVE DECONTAMINATION AND DECOMMISIONING OF U.S. DEPARTMENT OF ENERGY FACILITIES

    SciTech Connect

    Phillips, Ann Marie

    2003-02-27

    This paper describes fourteen basic science projects aimed at solving decontamination and decommissioning (D&D) problems within the U.S. Department of Energy (DOE). Funded by the Environmental Science Management Program (EMSP), these research projects address D&D problems where basic science is needed to expand knowledge and develop solutions to help DOE meet its cleanup milestones. EMSP uses directed solicitations targeted at identified Environmental Management (EM) needs to ensure that research results are directly applicable to DOE's EM problems. The program then helps transition the projects from basic to applied research by identifying end-users and coordinating proof-of-principle field tests. EMSP recently funded fourteen D&D research projects through the directed solicitation process. These research projects will be discussed, including description, current status, and potential impact. Through targeted research and proof-of-principle tests, it is hoped that EMSP's fourteen D&D basic research projects will directly impact and provide solutions to DOE's D&D problems.

  5. 75 FR 51026 - Environmental Management Advisory Board

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-18

    ... Program Update. EMAB Tank Waste Subcommittee Report. Acquisition and Project Management Panel. EMAB Acquisition and Project Management Subcommittee Report. Board Business and Subcommittee Updates. Public... Environmental Management Advisory Board AGENCY: Department of Energy. ACTION: Notice of open meeting....

  6. A program-level management system for the life cycle environmental and economic assessment of complex building projects

    SciTech Connect

    Kim, Chan-Joong; Kim, Jimin; Hong, Taehoon; Koo, Choongwan; Jeong, Kwangbok; Park, Hyo Seon

    2015-09-15

    Climate change has become one of the most significant environmental issues, of which about 40% come from the building sector. In particular, complex building projects with various functions have increased, which should be managed from a program-level perspective. Therefore, this study aimed to develop a program-level management system for the life-cycle environmental and economic assessment of complex building projects. The developed system consists of three parts: (i) input part: database server and input data; (ii) analysis part: life cycle assessment and life cycle cost; and (iii) result part: microscopic analysis and macroscopic analysis. To analyze the applicability of the developed system, this study selected ‘U’ University, a complex building project consisting of research facility and residential facility. Through value engineering with experts, a total of 137 design alternatives were established. Based on these alternatives, the macroscopic analysis results were as follows: (i) at the program-level, the life-cycle environmental and economic cost in ‘U’ University were reduced by 6.22% and 2.11%, respectively; (ii) at the project-level, the life-cycle environmental and economic cost in research facility were reduced 6.01% and 1.87%, respectively; and those in residential facility, 12.01% and 3.83%, respective; and (iii) for the mechanical work at the work-type-level, the initial cost was increased 2.9%; but the operation and maintenance phase was reduced by 20.0%. As a result, the developed system can allow the facility managers to establish the operation and maintenance strategies for the environmental and economic aspects from a program-level perspective. - Highlights: • A program-level management system for complex building projects was developed. • Life-cycle environmental and economic assessment can be conducted using the system. • The design alternatives can be analyzed from the microscopic perspective. • The system can be used to

  7. Environmental Management Science Program Workshop

    SciTech Connect

    1998-07-01

    This program summary book is a compendium of project summaries submitted by principal investigators in the Environmental Management Science Program and Environmental Management/Energy Research Pilot Collaborative Research Program (Wolf-Broido Program). These summaries provide information about the most recent project activities and accomplishments. All projects will be represented at the workshop poster sessions, so you will have an opportunity to meet with the researchers. The projects will be presented in the same order at the poster session as they are presented in this summary book. Detailed questions about an individual project may be directed to the investigators involved.

  8. 75 FR 3720 - Office of Environmental Management; Environmental Management Advisory Board Charter Renewal

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-22

    ... are not limited to, project management and oversight activities, cost/benefit analyses, program... of Environmental Management; Environmental Management Advisory Board Charter Renewal Pursuant to... Committee Management Secretariat, General Services Administration, notice is hereby given that...

  9. The MERINOVA project: MEteorological RIsks as drivers of environmental inNOvation in Agro-ecosystem management

    NASA Astrophysics Data System (ADS)

    Gobin, Anne; Van de vijver, Hans; Zamani, Sepideh; Curnel, Yannick; Planchon, Viviane; Verspecht, Ann; Van Huylenbroeck, Guido

    2014-05-01

    Devastating weather-related events have captured the interest of the general public in Belgium. Extreme weather events such as droughts, heat waves and rain storms are projected to increase both in frequency and magnitude with climate change. Since more than half of the Belgian territory is managed by the agricultural sector, extreme events may have significant impacts on agro-ecosystem services and pose severe limitations to sustainable agricultural land management. The research hypothesis of the MERINOVA project is that meteorological risks act as drivers of environmental innovation in agro-ecosystem management. The major objectives are to characterise extreme meteorological events, assess the impact on Belgian agro-ecosystems, characterise their vulnerability and resilience to these events, and explore innovative adaptation options to agricultural risk management. The project comprises of five major parts that reflect the chain of risks: the hazard, its impact on different agro-ecosystems, vulnerability, risk management and risk communication. Impacts developed from physically based models not only provide information on the state of the damage at any given time, but also assist in understanding the links between different factors causing damage and determining bio-physical vulnerability. Socio-economic impacts enlarge the basis for vulnerability mapping, risk management and adaptation options. The perspective of rising risk-exposure is exacerbated further by more limits to aid received for agricultural damage and an overall reduction of direct income support to farmers. The main findings of each of these project building blocks will be communicated. MERINOVA provides for a robust and flexible framework by demonstrating its performance across Belgian agro-ecosystems, and by ensuring its relevance to policy makers and practitioners. A strong expert and end-user network is established to help disseminating and exploiting project results to meet user needs. The

  10. Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Finch, S.M.

    1990-01-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that populations could have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Pacific Northwest Laboratory (PNL) under the direction of an independent Technical Steering Panel (TSP). The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates). The Source Terms Task develops estimates of radioactive emissions from Hanford facilities since 1944. The Environmental Transport Task reconstructs the movement of radioactive materials from the areas of release to populations. The Environmental Monitoring Data Task assembles, evaluates, and reports historical environmental monitoring data. The Demographics, Agriculture, Food Habits Task develops the data needed to identify the populations that could have been affected by the releases. In addition to population and demographic data, the food and water resources and consumption patterns for populations are estimated because they provide a primary pathway for the intake of radionuclides. The Environmental Pathways and Dose Estimates Task use the information produced by the other tasks to estimate the radiation doses populations could have received from Hanford radiation. Project progress is documented in this monthly report, which is available to the public. 3 figs., 3 tabs.

  11. Environmental management and economic development

    SciTech Connect

    Schramm, G.; Warford, J.J.

    1989-01-01

    Contents include: environmental management and economic policy in developing countries; environmental and natural resource accounting; marginal opportunity cost as a planning concept in natural resource management; the environmental basis of sustainable development; economic incentives for sustainable production; deforestation in Brazil's Amazon region: magnitude, rate, and causes; an economic justification for rural afforestation: the case of Ethiopia; managing the supply of and demand for fuelwood in Africa; economic aspects of afforestation and soil-conservation projects; multilevel resource analysis and management: the case of watersheds.

  12. Guidelines for Project Management

    NASA Technical Reports Server (NTRS)

    Ben-Arieh, David

    2001-01-01

    Project management is an important part of the professional activities at Kennedy Space Center (KSC). Project management is the means by which many of the operations at KSC take shape. Moreover, projects at KSC are implemented in a variety of ways in different organizations. The official guidelines for project management are provided by NASA headquarters and are quite general. The project reported herein deals with developing practical and detailed project management guidelines in support of the project managers. This report summarizes the current project management effort in the Process Management Division and presents a new modeling approach of project management developed by the author. The report also presents the Project Management Guidelines developed during the summer.

  13. Natural resource risk and cost management in environmental restoration: Demonstration project at the Savannah River Site

    SciTech Connect

    Bascietto, J.J.; Sharples, F.E.

    1995-12-31

    The US Department of Energy (DOE) is both a trustee for the natural resources present on its properties and the lead response agency under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). As such, DOE is addressing the destruction or loss of those resources caused by releases of hazardous substances from its facilities (DOE 1991) and collecting data to be used in determining the extent of contamination at its facilities, estimating risks to human health and the environment, and selecting appropriate remedial actions. The remedial investigation/feasibility study (RI/FS) process is used to investigate sites and select remedial actions. A Natural Resource Damage Assessment (NRDA) process may be used to determine whether natural resources have also been injured by the released hazardous substances and to calculate compensatory monetary damages to be used to restore the natural resources. In FY 1994, the Savannah River Site (SRS) was chosen to serve as a demonstration site for testing the integrated NRDA framework and demonstrating how NRDA concerns might be integrated into the environmental restoration activities of an actual site that is characteristically large and complex. The demonstration project (1) provided a means to illustrate the use of complex analyses using real information on the specific natural resources of the SRS; (2) served as a vehicle for reinforcing and expanding the SRS staff`s understanding of the links between the NRDA and RI/FS processes; (3) provided a forum for the discussion of strategic issues with SRS personnel; and (4) allowed the refining and elaboration of DOE guidance by benchmarking the theoretical process using real information and issues.

  14. Integration of health physics, safety and operational processes for management and disposition of recycled uranium wastes at the Fernald Environmental Management Project (FEMP)

    SciTech Connect

    Barber, James; Buckley, James

    2003-02-23

    Fluor Fernald, Inc. (Fluor Fernald), the contractor for the U. S. Department of Energy (DOE) Fernald Environmental Management Project (FEMP), recently submitted a new baseline plan for achieving site closure by the end of calendar year 2006. This plan was submitted at DOE's request, as the FEMP was selected as one of the sites for their accelerated closure initiative. In accordance with the accelerated baseline, the FEMP Waste Management Project (WMP) is actively evaluating innovative processes for the management and disposition of low-level uranium, fissile material, and thorium, all of which have been classified as waste. These activities are being conducted by the Low Level Waste (LLW) and Uranium Waste Disposition (UWD) projects. Alternatives associated with operational processing of individual waste streams, each of which poses potentially unique health physics, industrial hygiene and industrial hazards, are being evaluated for determination of the most cost effective and safe met hod for handling and disposition. Low-level Mixed Waste (LLMW) projects are not addressed in this paper. This paper summarizes historical uranium recycling programs and resultant trace quantity contamination of uranium waste streams with radionuclides, other than uranium. The presentation then describes how waste characterization data is reviewed for radiological and/or chemical hazards and exposure mitigation techniques, in conjunction with proposed operations for handling and disposition. The final part of the presentation consists of an overview of recent operations within LLW and UWD project dispositions, which have been safely completed, and a description of several current operations.

  15. Managing Projects for Change: Contextualised Project Management

    ERIC Educational Resources Information Center

    Tynan, Belinda; Adlington, Rachael; Stewart, Cherry; Vale, Deborah; Sims, Rod; Shanahan, Peter

    2010-01-01

    This paper will detail three projects which focussed on enhancing online learning at a large Australian distance education University within a School of Business, School of Health and School of Education. Each project had special funding and took quite distinctive project management approaches, which reflect the desire to embed innovation and…

  16. Multimedia environmental management

    SciTech Connect

    Soesilo, J.A.; Wiley, W.D.

    1999-09-01

    This book explores and supports the argument that effective environmental management must be based on a multimedia approach, which focuses simultaneously on air, water, and waste and enables managers to assess the resulting financial, operation, and management benefits. The multimedia approach, which can be used to design an effective compliance program, includes proper waste and material handling management, systematic monitoring, and record keeping requirements. This approach integrates a wide array of environmental requirements and decision processes, which the authors examine in sixteen chapters, organized into four parts: the role of environmental management; environmental aspects of business operation, environmental processes; and environmental management trends. Within these parts, the authors highlight the development of modern environmental management and provide an overview of federal laws pertinent to multimedia environmental management. They examine such issues as chemical storage and transportation, tank system operations and requirements, waste determination, spill response procedures, and employee training. Environmental processes addressed in the book include the management of solid and hazardous waste, wastewater treatment systems, stormwater management, air emission control, and site remediation. The authors also briefly discuss significant initiatives in US environmental management and look toward corporate sustainable development.

  17. Integrating TQM into environmental restoration projects

    SciTech Connect

    Caldwell, J.A.

    1992-12-31

    Responsible and cost-effective waste management and environmental restoration are best achieved when the principles and procedures of Total Quality Management are made an integral part of the process. By describing three case histories, we explore and explain techniques for using TQM in environmental projects. Key aspects considered include: quality measurement systems; establishing and maintaining standard operating procedures; management and technical peer review; the use of Quality Improvement Teams; Roadmapping (a new procedure that the US Department of Energy is incorporating into environmental restoration programs); and the role of audit teams in document production. The three case histories covered include: The Department of Energy`s Uranium Mill Tailings Remedial Action Project on which Roadmapping and Quality Improvement Teams have led to significant changes in procedures; the EPA ARCS program on which adoption of project management Standard Operating Procedures enhanced cost and schedule control; the Jacobs Engineering TQM program that emphasizes performance measurement and management and project technical peer review.

  18. Waste Management Process Improvement Project

    SciTech Connect

    Atwood, J.; Borden, G.; Rangel, G. R.

    2002-02-25

    The Bechtel Hanford-led Environmental Restoration Contractor team's Waste Management Process Improvement Project is working diligently with the U.S. Department of Energy's (DOE) Richland Operations Office to improve the waste management process to meet DOE's need for an efficient, cost-effective program for the management of dangerous, low-level and mixed-low-level waste. Additionally the program must meet all applicable regulatory requirements. The need for improvement was highlighted when a change in the Groundwater/Vadose Zone Integration Project's waste management practices resulted in a larger amount of waste being generated than the waste management organization had been set up to handle.

  19. Total Water Management: A Research Project of the United States Environmental Protection Agency

    EPA Science Inventory

    Total Water Management (TWM) examines urban water systems in an interconnected manner. It encompasses reducing water demands, increasing water recycling and reuse, creating water supply assets from stormwater management, matching water quality to end-use needs, and achieving envi...

  20. Hanford Environmental Dose Reconstruction Project Monthly Report

    SciTech Connect

    Finch, S.M.

    1990-10-01

    This monthly report summarizes the technical progress and project status for the Hanford Environmental Dose Reconstruction (HEDR) Project being conducted at the Pacific Northwest Laboratory (PNL) under the direction of a Technical Steering Panel (TSP). The TSP is composed of experts in numerous technical fields related to this project and represents the interests of the public. The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that populations could have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Pacific Northwest Laboratory (PNL) under the direction of an independent Technical Steering Panel (TSP). The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): source terms, environmental transport, environmental monitoring data, demographics, agriculture, food habits, and environmental pathways and dose estimates. 3 figs., 3 tabs.

  1. Hanford Environmental Dose Reconstruction Project Monthly Report

    SciTech Connect

    Finch, S.M.

    1990-01-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that populations could have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Pacific Northwest Laboratory (PNL) under the direction of an independent Technical Steering Panel (TSP). The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demographics; agriculture; food habits; and environmental pathways and dose estimates. 3 figs.

  2. Hanford Environmental Dose Reconstruction Project Monthly Report

    SciTech Connect

    Finch, S.M.; McMakin, A.H.

    1991-04-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that populations could have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Pacific Northwest Laboratory (PNL) under the direction of an independent Technical Steering Panel (TSP). The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from released to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demographics, agriculture, food habits; and, environmental pathways and dose estimates.

  3. Hanford Environmental Dose Reconstruction Project Monthly Report

    SciTech Connect

    Finch, S.M.

    1991-07-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Pacific Northwest Laboratory (PNL) under the direction of an independent Technical Steering Panel (TSP). The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): Source terms; environmental transport; environmental monitoring data; demographics, agriculture, food habits; and environmental pathways and dose estimates. 2 figs., 2 tabs.

  4. Hanford Environmental Dose Reconstruction Project Monthly Report

    SciTech Connect

    Finch, S.M.; McMakin, A.H.

    1991-05-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Pacific Northwest Laboratory (PNL) under the direction of an independent Technical Steering Panel (TSP). The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): Source Terms, Environmental Transport, Environmental Monitoring Data, Demographics, Agriculture, Food Habits, Environmental Pathways and Dose Estimates. 2 figs., 1 tab.

  5. Hanford Environmental Dose Reconstruction Project monthly report

    SciTech Connect

    Finch, S.M.

    1990-12-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that populations could have been have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Pacific Northwest Laboratory (PNL) under the direction of an independent Technical Steering Panel (TSP). The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demographics, agriculture, food habits; and environmental pathways and dose estimates. 3 figs., 3 tabs.

  6. Environmental Cleanup Best Management Practices: Effective Use of the Project Life Cycle Conceptual Site Model

    EPA Pesticide Factsheets

    This fact sheet is the first in a series of documents that address conceptual site models (CSMs). This fact sheet summarizes how environmental practitioners can use CSMs to achieve, communicate, and maintain stakeholder consensus.

  7. Regional Sustainable Environmental Management

    EPA Science Inventory

    Regional sustainable environmental management is an interdisciplinary effort to develop a sufficient understanding of the interactions between ecosystems, the economy, law, and technology to formulate effective long-term management strategies on a regional scale. Regional sustai...

  8. Regional Sustainable Environmental Management

    EPA Science Inventory

    Regional sustainable environmental management is an interdisciplinary effort to develop a sufficient understanding of the interactions between ecosystems, the economy, law, and technology to formulate effective long-term management strategies on a regional scale. Regional sustai...

  9. Environmental Restoration Program project management plan for the DOE Oak Ridge Field Office Major System Acquisition OR-1. Revision 1, Environmental Restoration Program

    SciTech Connect

    Not Available

    1992-12-01

    In the early 1940s, the Manhattan Project was conducted in a regulatory and operational environment less sophisticated than today. Less was known of the measures needed to protect human health and safety and the environment from the dangers posed by radioactive and hazardous wastes, and experience in dealing with these hazardous materials has grown slowly. Certain hazards were recognized and dealt with from the beginning. However, the techniques used, though standard practices at the time, are now known to have been inadequate. Consequently, the DOE has committed to an aggressive program for cleaning up the environment and has initiated an Environmental Restoration Program involving all its field offices. The objective of this program is to ensure that inactive and surplus DOE facilities and sites meet current standards to protect human health and the environment. The objective of these activities is to ensure that risks posed to human health and safety and the environment by inactive sites and surplus facilities contaminated with radioactive, hazardous, and/or mixed wastes are either eliminated or reduced to prescribed safe levels. This Project Management Plan for Major System Acquisition OR-1 Project documents, communicates, and contributes to the evolution of, the management organizations, systems, and tools necessary to carry out effectively the long-range complex cleanup of the DOE sites on the Oak Ridge Reservation, and at the Paducah, Kentucky, and Piketon, Ohio, uranium enrichment plants managed by the Department of Energy Oak Ridge Field Office; the cleanup of off-site contamination resulting from past releases; and the Decontamination and Decommissioning of surplus DOE facilities at these installations.

  10. Office of Inspector General report on audit of proposal to acquire land at the Fernald Environmental Management Project

    SciTech Connect

    1997-06-05

    The US Department of Energy (Department) obtained an appraisal and developed a cost estimate to acquire 78 to 100 acres of privately-held land adjoining the Fernald Environmental Management Project (FEMP) as an additional buffer for a waste disposal facility. The objective of this audit was to determine whether the proposed purchase of land was essential to support the site`s mission. The Department obtained an appraisal and developed a cost estimate to acquire the additional land without confirming that av lid need for the land existed. If the land is acquired, the Department could spend between $655,000 and $2.2 million unnecessarily. Additionally, the Department could incur unnecessary maintenance and security costs to maintain the land after acquisition. It was recommended that the Manager, Ohio Field Office, dismiss the proposal to acquire the additional land. Management agreed with the recommendation, stating that the acquisition could not be justified at this time. However, management did not agree with the finding that the Department obtained an appraisal and developed a cost estimate without confirming that a valid need for the land existed. Management stated that the appraisal and cost estimate were principal and necessary to determining whether a need for the land existed. It was concluded that the appraisal and cost estimate should not have been performed because a valid need for the land was never established. Also, it was concluded that it would be inappropriate to reconsider the proposal to acquire the land at a later date if additional funds become available, unless a valid need for the land is first established.

  11. Development of Computer Software to Aid Environmental Decision Makers in the Education and Training of Air Force Remedial Project Managers

    DTIC Science & Technology

    1993-12-01

    purpose of this study was to define the Air Force Institute of Technology Civil Engineering and Services Environmental Education Centers’ (AFIT/CEV-EEC...this research was to develop prototype knowledge-based systems to determine the feasibility of creating an environmental education course blueprint and...Civil Engineering and Services Department of Environmental Management named the Environmental Education Center (AFIT/CEV-EEC). This office provides

  12. Final environmental assessment for the U.S. Department of Energy, Oak Ridge Operations receipt and storage of uranium materials from the Fernald Environmental Management Project site

    SciTech Connect

    1999-06-01

    Through a series of material transfers and sales agreements over the past 6 to 8 years, the Fernald Environmental Management Project (FEMP) has reduced its nuclear material inventory from 14,500 to approximately 6,800 metric tons of uranium (MTU). This effort is part of the US Department of energy`s (DOE`s) decision to change the mission of the FEMP site; it is currently shut down and the site is being remediated. This EA focuses on the receipt and storage of uranium materials at various DOE-ORO sites. The packaging and transportation of FEMP uranium material has been evaluated in previous NEPA and other environmental evaluations. A summary of these evaluation efforts is included as Appendix A. The material would be packaged in US Department of Transportation-approved shipping containers and removed from the FEMP site and transported to another site for storage. The Ohio Field Office will assume responsibility for environmental analyses and documentation for packaging and transport of the material as part of the remediation of the site, and ORO is preparing this EA for receipt and storage at one or more sites.

  13. Determination of total and isotopic uranium by inductively coupled plasma-mass spectrometry at the Fernald Environmental Management Project

    SciTech Connect

    Miller, F.L.; Bolin, R.N.; Feller, M.T.; Danahy, R.J.

    1995-04-01

    At the Fernald Environmental Management Project (FEMP) in southwestern Ohio, ICP-mass spectrometry (ICP-MS), with sample introduction by peristaltic pumping, is used to determine total and isotopic uranium (U-234, U-235, U-236 and U-238) in soil samples. These analyses are conducted in support of the environmental cleanup of the FEMP site. Various aspects of the sample preparation and instrumental analysis will be discussed. Initial sample preparation consists of oven drying to determine moisture content, and grinding and rolling to homogenize the sample. This is followed by a nitric/hydrofluoric acid digestion to bring the uranium in the sample into solution. Bismuth is added to the sample prior to digestion to monitor for losses. The total uranium (U-238) content of this solution and the U{sup 235}/U{sup 238} ratio are measured on the first pass through the ICP-MS. To determine the concentration of the less abundant U{sup 234} and U{sup 236} isotopes, the digestate is further concentrated by using Eichrom TRU-Spec extraction columns before the second pass through the ICP-MS. Quality controls for both the sample preparation and instrumental protocols will also be discussed. Finally, an explanation of the calculations used to report the data in either weight percent or activity units will be given.

  14. Environmental Management Performance Report July 2000

    SciTech Connect

    EDER, D.M.

    2000-07-01

    The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-RL) a monthly summary of the Project Hanford Management Contractor's (PHMC) Environmental Management (EM) performance by Fluor Hanford (FH) and its subcont.

  15. Spent Nuclear Fuel project, project management plan

    SciTech Connect

    Fuquay, B.J.

    1995-10-25

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  16. Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Cannon, S.D.; Finch, S.M.

    1992-10-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The independent Technical Steering Panel (TSP) provides technical direction. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates):Source Terms, Environmental Transport, Environmental Monitoring Data, Demography, Food Consumption, and Agriculture, and Environmental Pathways and Dose Estimates.

  17. Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Finch, S.M.; McMakin, A.H.

    1991-01-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): Source terms; environmental transport environmental monitoring data; demographics, agriculture, food habits; environmental pathways and dose estimates.

  18. Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Finch, S.M.; McMakin, A.H.

    1992-02-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demography, food consumption, and agriculture; environmental pathways and dose estimates.

  19. Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Finch, S.M.; McMakin, A.H.

    1992-01-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): Source Terms, Environmental Transport, Environmental Monitoring Data, Demography, Food Consumption, and Agriculture, and Environmental Pathways and Dose Estimates.

  20. Hanford Environmental Dose Reconstruction Project Monthly Report

    SciTech Connect

    Finch, S.M.

    1991-03-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that populations could have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Pacific Northwest Laboratory (PNL) under the direction of an independent Technical Steering Panel (TSP). The project is divided into the technical tasks which correspond to the path radionuclides followed, from release to impact on humans (dose estimates): source terms; environmental transport; environment monitoring data; demographics, agriculture, food habits; and environmental pathways and dose estimates. 3 figs., 2 tabs.

  1. Removal of uranium and priority pollutant metals from Fernald Environmental Management Project wastewater utilizing potassium ferrate

    SciTech Connect

    Hampshire, L.H. . Fernald Environmental Management Project); Potts, M.E. )

    1992-01-30

    A side-by-side treatment comparison between calcium hydroxide and TRU/Clear {reg sign} 4'', a potassium ferrate based wastewater treatment chemical, was performed in a process wastewater and stormwater treatment facility. Results from the full-scale plant testing demonstrated that potassium ferrate could achieve the same treatment levels as calcium hydroxide while generating 55% less sludge than the calcium hydroxide treatment. The testing also showed that utilization of potassium ferrate would minimize the volume of sludge generated and assist in the reduction of total waste management costs associated with storage, monitoring, transportation, and final disposition of generated sludge.

  2. Removal of uranium and priority pollutant metals from Fernald Environmental Management Project wastewater utilizing potassium ferrate

    SciTech Connect

    Hampshire, L.H.; Potts, M.E.

    1992-01-30

    A side-by-side treatment comparison between calcium hydroxide and TRU/Clear {reg_sign} ``4``, a potassium ferrate based wastewater treatment chemical, was performed in a process wastewater and stormwater treatment facility. Results from the full-scale plant testing demonstrated that potassium ferrate could achieve the same treatment levels as calcium hydroxide while generating 55% less sludge than the calcium hydroxide treatment. The testing also showed that utilization of potassium ferrate would minimize the volume of sludge generated and assist in the reduction of total waste management costs associated with storage, monitoring, transportation, and final disposition of generated sludge.

  3. Principles of project management

    NASA Technical Reports Server (NTRS)

    1982-01-01

    The basic principles of project management as practiced by NASA management personnel are presented. These principles are given as ground rules and guidelines to be used in the performance of research, development, construction or operational assignments.

  4. Successful completion of a RCRA closure for the Fernald Environmental Management Project

    SciTech Connect

    Lippitt, J.M.; Kolthoff, K.

    1995-02-01

    This paper discusses the successful completion of a RCRA (Resource Conservation and Recovery Act) closure of a HF (hydrofluoric acid) tank car at FEMP, which is on the national priorities list of hazardous waste sites and is undergoing CERCLA remediation. The HF tank car closure was conducted by FERMCO. Through a combination of sound planning and team work, the HF tank car was closed safely and ahead of schedule. During > 22,000 hr field work required for construction modifications and neutralization of 9,600 gallons of HF and decontamination rinseates, there were no OSHA recordable incidents. The system design avoided additional costs by maximizing use of existing equipment and facilities. This successful closure of the HF tank car demonstrates FEMP`s commitment to reducing risks and cleaning up the facility in a manner consistent with objectives of RCRA regulations and the Ohio EPA hazardous waste rules. This in turn facilitated ongoing negotiations with Ohio EPA to integrate RCRA closure and the ongoing CERCLA remediation activities. This paper addresses why the unit was clean closed under an approved RCRA Closure Plan. Integration of EPA regulations for RCRA and CERCLA programs and the DOE-Orders impacting design, construction and operation of an acid neutralization system is also reviewed. The paper concludes with a discussion of lessons learned in the process in preparing the closure plant and through final project close out.

  5. River Protection Project (RPP) Project Management Plan

    SciTech Connect

    NAVARRO, J.E.

    2001-03-07

    The Office of River Protection (ORP) Project Management Plan (PMP) for the River Protection Project (RPP) describes the process for developing and operating a Waste Treatment Complex (WTC) to clean up Hanford Site tank waste. The Plan describes the scope of the project, the institutional setting within which the project must be completed, and the management processes and structure planned for implementation. The Plan is written from the perspective of the ORP as the taxpayers' representative. The Hanford Site, in southeastern Washington State, has one of the largest concentrations of radioactive waste in the world, as a result of producing plutonium for national defense for more than 40 years. Approximately 53 million gallons of waste stored in 177 aging underground tanks represent major environmental, social, and political challenges for the U.S. Department of Energy (DOE). These challenges require numerous interfaces with state and federal environmental officials, Tribal Nations, stakeholders, Congress, and the US Department of Energy-Headquarters (DOE-HQ). The cleanup of the Site's tank waste is a national issue with the potential for environmental and economic impacts to the region and the nation.

  6. Do environmental projects promote gender equity?

    PubMed

    Joekes, S

    1995-02-01

    In the 1980s, governments and development agencies began to recognize the need to consider gender issues in their environmental and natural resource management programs. First came the understanding that women play a vital role in the management of natural resources and often have a strong traditional and contemporary knowledge of their environment. To exclude them would damage the efficacy of any project. Next, donor agencies came to view women, in their roles as environmental managers, as vulnerable victims of and contributors to environmental degradation. When awareness grew of examples of women successfully fighting to conserve local resources, women were considered important local assets to be used in efforts toward better environmental management. New environmental projects began by asking whether the protected resource was used by men or women in order to target the crucial people. For example, when planning to preserve forests, it is useful to recognize that men typically use wood for construction and fencing, while women use it for cooking fires. It has become increasingly common for women to participate in water and sanitation committees. But good intentions have often been subverted. Community level management of environmental projects does not guarantee female participation. Sometimes involving women means that women do all the physical labor without receiving their fair share of the benefits. In areas where women's property rights are restricted, women will have little authority in resource management. Legal reforms are needed, but they must be complemented at the local level by collective action.

  7. Environmental Requirements Management

    SciTech Connect

    Cusack, Laura J.; Bramson, Jeffrey E.; Archuleta, Jose A.; Frey, Jeffrey A.

    2015-01-08

    CH2M HILL Plateau Remediation Company (CH2M HILL) is the U.S. Department of Energy (DOE) prime contractor responsible for the environmental cleanup of the Hanford Site Central Plateau. As part of this responsibility, the CH2M HILL is faced with the task of complying with thousands of environmental requirements which originate from over 200 federal, state, and local laws and regulations, DOE Orders, waste management and effluent discharge permits, Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) response and Resource Conservation and Recovery Act (RCRA) corrective action documents, and official regulatory agency correspondence. The challenge is to manage this vast number of requirements to ensure they are appropriately and effectively integrated into CH2M HILL operations. Ensuring compliance with a large number of environmental requirements relies on an organization’s ability to identify, evaluate, communicate, and verify those requirements. To ensure that compliance is maintained, all changes need to be tracked. The CH2M HILL identified that the existing system used to manage environmental requirements was difficult to maintain and that improvements should be made to increase functionality. CH2M HILL established an environmental requirements management procedure and tools to assure that all environmental requirements are effectively and efficiently managed. Having a complete and accurate set of environmental requirements applicable to CH2M HILL operations will promote a more efficient approach to: • Communicating requirements • Planning work • Maintaining work controls • Maintaining compliance

  8. Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Finch, S.M.

    1990-09-01

    This monthly report summarizes the technical progress and project status for the Hanford Environmental Dose Reconstruction (HEDR) Project being conducted at the Pacific Northwest Laboratory (PNL) under the direction of a Technical Steering Panel (TSP). The TSP is composed of experts in numerous technical fields related to this project and represents the interests of the public. The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): source terms, environmental transport, environmental monitoring data, demographics, agriculture, food habits, environmental pathways and dose estimates. 3 figs.

  9. River Protection Project (RPP) Project Management Plan

    SciTech Connect

    SEEMAN, S.E.

    2000-04-01

    The U.S. Department of Energy (DOE), in accordance with the Strom Thurmond National Defense Authorization Act for Fiscal Year 1999, established the Office of River Protection (ORP) to successfully execute and manage the River Protection Project (RPP), formerly known as the Tank Waste Remediation System (TWRS). The mission of the RPP is to store, retrieve, treat, and dispose of the highly radioactive Hanford tank waste in an environmentally sound, safe, and cost-effective manner. The team shown in Figure 1-1 is accomplishing the project. The ORP is providing the management and integration of the project; the Tank Farm Contractor (TFC) is responsible for providing tank waste storage, retrieval, and disposal; and the Privatization Contractor (PC) is responsible for providing tank waste treatment.

  10. Development of a risk-based environmental management tool for drilling discharges. Summary of a four-year project.

    PubMed

    Singsaas, Ivar; Rye, Henrik; Frost, Tone Karin; Smit, Mathijs G D; Garpestad, Eimund; Skare, Ingvild; Bakke, Knut; Veiga, Leticia Falcao; Buffagni, Melania; Follum, Odd-Arne; Johnsen, Ståle; Moltu, Ulf-Einar; Reed, Mark

    2008-04-01

    This paper briefly summarizes the ERMS project and presents the developed model by showing results from environmental fates and risk calculations of a discharge from offshore drilling operations. The developed model calculates environmental risks for the water column and sediments resulting from exposure to toxic stressors (e.g., chemicals) and nontoxic stressors (e.g., suspended particles, sediment burial). The approach is based on existing risk assessment techniques described in the European Union technical guidance document on risk assessment and species sensitivity distributions. The model calculates an environmental impact factor, which characterizes the overall potential impact on the marine environment in terms of potentially impacted water volume and sediment area. The ERMS project started in 2003 and was finalized in 2007. In total, 28 scientific reports and 9 scientific papers have been delivered from the ERMS project (http://www.sintef.no/erms).

  11. Environmental Land Management in Tajikistan

    NASA Astrophysics Data System (ADS)

    Makhmudov, Zafar; Ergashev, Murod

    2015-04-01

    Tackling Environmental Land Management in Tajikistan "Project approach" Khayrullo Ibodzoda, Zafar Mahmoudov, Murod Ergashev, Kamoliddin Abdulloev Among 28 countries in Europe and Central Asia, Tajikistan is estimated to be the most vulnerable to the climate change impacts depending on its high exposure and sensitivity combined with a very low adaptive capacity. The agricultural sector of Tajikistan is subject to lower and more erratic rainfalls, as well as dryness of water resources due to the possible temperature rising in the region, high evaporation, reducing the accumulation of snow in the mountain glaciers and increased frequency of extreme events. Climate change and variability are likely to pose certain risks, especially for those who prefer natural agriculture or pasture management that just reinforces the need for sound, adapted to new climatic conditions and improved principles of land management. Adoption of new strategies and best practices on sustainable land and water management for agricultural ecosystems will help the farmers and communities in addressing the abovementioned problems, adapt and become more resilient to changing climate by increasing wellbeing of local population, and contributing to food security and restoring productive natural resources. The Environmental Land Management and Rural Livelihoods Project is being financed by the Pilot Program for Climate Resilience (PPCR) and Global Environment Facility (GEF). The Project goal is to enable the rural population to increase their productive assets by improving management of natural resources and building resilience to climate change in selected climate vulnerable sites. The project will facilitate introduction of innovative measures on land use and agricultural production by providing small grants at the village level and grants for the Pasture User Groups (PUGs) at jamoat level in order to implement joint plans of pasture management and wellbred livestock, also for the Water User

  12. Environmental Management Systems

    EPA Pesticide Factsheets

    This site on Environmental Management Systems (EMS) provides information and resources related to EMS for small businesses and private industry, as well as local, state and federal agencies, including all the EPA offices and laboratories.

  13. Project MAPP Management Manual.

    ERIC Educational Resources Information Center

    Weller, Lynne; And Others

    This guide provides materials related to the management of the Maryland Adult Performance Program (Project MAPP). The Project MAPP model is comprised of assessment, instruction, management/guidance, and staff development components. Section I provides the rationale for this competency-based educational delivery system for adult learners enrolled…

  14. FLEXI Project Management Survey

    NASA Astrophysics Data System (ADS)

    Rohunen, Anna; Krzanik, Lech; Kuvaja, Pasi; Similä, Jouni; Rodriguez, Pilar; Hyysalo, Jarkko; Linna, Tommi

    FLEXI Project Management Survey (FLEXI PMS) has been established to gain detailed knowledge on how the software industry - in particular successful companies - manages agile software development. FLEXI PMS investigates the actual agile values, principles, practices and contexts. The survey is supported by a careful literature review and analysis of existing studies. Special attention is attached to large, multi-site, multi-company and distributed projects - the target area of FLEXI project. The survey is intended to provide solid data for further knowledge acquisition and project/company positioning with regard to feasible agile management practices.

  15. Managing Projects with KPRO

    NASA Technical Reports Server (NTRS)

    Braden, Barry M.

    2004-01-01

    How does a Project Management Office provide: Consistent, familiar, easily used scheduling tools to Project Managers and project team members? Provide a complete list of organization resources available for use on the project? Facilitate resource tracking and visibility? Provide the myriad reports that the organization requires? Facilitate consistent budget planning and cost performance information? Provide all of this to the entire organization? Provide for the unique requirement of the organization? and get people to use it? Answer: Implementation of the Kennedy space Center Projects and Resources Online (KPRO), a modified COTS solution.

  16. River Protection Project (RPP) Environmental Program Plan

    SciTech Connect

    POWELL, P.A.

    2000-03-29

    This Environmental Program Plan was developed in support of the Integrated Environment, Safety, and Health Management System Plan (ISMS) (RPP-MP-003), which establishes a single, defined environmental, safety, and health management system that integrates requirements into the work planning and execution processes to protect workers, the public, and the environment. The ISMS also provides mechanisms for increasing worker involvement in work planning, including hazard and environmental impact identification, analysis, and control; work execution; and feedback/improvement processes. The ISMS plan consists of six core functions. Each section of this plan describes the activities of the River Protection Project (RPP) (formerly known as the Tank Waste Remediation System) Environmental organization according to the following core functions: Establish Environmental Policy; Define the Scope of Work; Identify Hazards, Environmental Impacts, and Requirements; Analyze Hazards and Environmental Impacts and Implement Controls; Perform Work within Controls; and Provide Feedback and Continuous Improvement.

  17. Environmental audit: West Valley Demonstration Project

    SciTech Connect

    Not Available

    1992-01-01

    This report documents the results of the Environmental Audit of West Valley Demonstration Project (WVDP) located in West Valley, New York. The WVDP Environmental Audit was conducted from July 29 through August 16, 1991, by the Office of Environmental Audit (EH-24). This Audit evaluated environmental programs and activities at WVDP as well as the overall environmental management system. The scope of the Environmental Audit was comprehensive, addressing environmental media and Federal, state, and local regulations, with the exception of the National Environmental Policy Act (NEPA). Also addressed were DOE Orders, WVDP 1989 ES&H Assessment Action Plan, formalized facility or program operating procedures, and BMPS. The technical disciplines addressed by the Audit were: Air; Surface Water; Soils, Sediment and Biota; Groundwater; Waste Management; Toxic and Chemical Materials; Radiation; Quality Assurance; and Inactive Waste Sites. In addition, the Audit included a review of environmental management programs within the West Valley Project Office (WVPO). West Valley Nuclear Services (WVNS), and Subcontractor organizations. The effectiveness of environmental monitoring programs was a major component of the review conducted within each technical discipline.

  18. Environmental audit: West Valley Demonstration Project

    SciTech Connect

    Not Available

    1992-01-01

    This report documents the results of the Environmental Audit of West Valley Demonstration Project (WVDP) located in West Valley, New York. The WVDP Environmental Audit was conducted from July 29 through August 16, 1991, by the Office of Environmental Audit (EH-24). This Audit evaluated environmental programs and activities at WVDP as well as the overall environmental management system. The scope of the Environmental Audit was comprehensive, addressing environmental media and Federal, state, and local regulations, with the exception of the National Environmental Policy Act (NEPA). Also addressed were DOE Orders, WVDP 1989 ES H Assessment Action Plan, formalized facility or program operating procedures, and BMPS. The technical disciplines addressed by the Audit were: Air; Surface Water; Soils, Sediment and Biota; Groundwater; Waste Management; Toxic and Chemical Materials; Radiation; Quality Assurance; and Inactive Waste Sites. In addition, the Audit included a review of environmental management programs within the West Valley Project Office (WVPO). West Valley Nuclear Services (WVNS), and Subcontractor organizations. The effectiveness of environmental monitoring programs was a major component of the review conducted within each technical discipline.

  19. Managing the environmental organization

    SciTech Connect

    Ries, K.M.

    1994-12-31

    The volume and variety of challenges involved in environmental management of a business are great. Unfortunately, the staff available to address these challenges is far too small in most organizations. This chapter examines how to maximize the effectiveness of a small staff by managing the internal organization and properly selecting outside consultants.

  20. Environmental Management Fact Sheets.

    ERIC Educational Resources Information Center

    Department of Energy, Washington, DC.

    In recent years, the need for nuclear materials has decreased and the Department of Energy (DOE) has focused greater attention on cleaning up contamination left from past activities. The Office of Environmental Management (EM) within DOE is responsible for managing waste and cleaning up contamination at DOE sites across the nation. This collection…

  1. Hanford Site environmental management specification

    SciTech Connect

    Grygiel, M.L.

    1998-06-10

    The US Department of Energy, Richland Operations Office (RL) uses this Hanford Site Environmental Management Specification (Specification) to document top-level mission requirements and planning assumptions for the prime contractors involved in Hanford Site cleanup and infrastructure activities under the responsibility of the US Department of Energy, Office of Environmental Management. This Specification describes at a top level the activities, facilities, and infrastructure necessary to accomplish the cleanup of the Hanford Site and assigns this scope to Site contractors and their respective projects. This Specification also references the key National Environmental Policy Act of 1969 (NEPA), Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), and safety documentation necessary to accurately describe the cleanup at a summary level. The information contained in this document reflects RL`s application of values, priorities, and critical success factors expressed by those involved with and affected by the Hanford Site project. The prime contractors and their projects develop complete baselines and work plans to implement this Specification. These lower-level documents and the data that support them, together with this Specification, represent the full set of requirements applicable to the contractors and their projects. Figure 1-1 shows the relationship of this Specification to the other basic Site documents. Similarly, the documents, orders, and laws referenced in this specification represent only the most salient sources of requirements. Current and contractual reference data contain a complete set of source documents.

  2. Environmental Management in Mainland China.

    ERIC Educational Resources Information Center

    Shen, Thomas T.

    1984-01-01

    Provides an overview of China's environmental pollution management by discussing: China's Environmental Protection Organization; laws and regulations; environmental protection program; education and manpower training; and research into environmental pollution problems. (The author provided technical assistance to China's environmental pollution…

  3. Environmental Management in Mainland China.

    ERIC Educational Resources Information Center

    Shen, Thomas T.

    1984-01-01

    Provides an overview of China's environmental pollution management by discussing: China's Environmental Protection Organization; laws and regulations; environmental protection program; education and manpower training; and research into environmental pollution problems. (The author provided technical assistance to China's environmental pollution…

  4. A Manual of Mosquito Control Projects and Committee Assignments for 4-H and Scouts Biology Class Projects, Organized Community Service Programs, and Individuals Interested in Environmental Management.

    ERIC Educational Resources Information Center

    Hart, Richard A.

    The mosquito control projects presented in this manual were prepared from an educational viewpoint and are intended for use by students in 4-H and Scouts and as a supplement to high school and college biology course work. The major emphasis of the projects is on integrated pest management, an approach utilizing cost-effective control methods which…

  5. Project management controls

    SciTech Connect

    Hardin, D.S. ); Carnes, W.S. )

    1990-01-01

    Project management controls are utilized to enhance the probability that a project will be successful. The control system used by a project manager can take many forms and can be applied at different times to varying degrees on a given project depending upon its complexity. The Consolidated Incineration Facility (CIF) is one project of many at the Savannah River Site (SRS). The United States Department of Energy Order 4700.1 is a project management system that is applied on a site-wide basis, thus including the CIF. The control system required by this order is proceduralized to ensure that it is applied in a consistent manner and will produce reliable results. These results provide the project manager with a correlation of both costs and schedule within the defined scope to adequately asses the status of the project. This is an iterative process and can be simply stated: plan, actual, variance, corrective action, prediction, and revision. This paper presents the basis for the project management controls applied at the Savannah River Site.

  6. Project management controls

    SciTech Connect

    Hardin, D.S.; Carnes, W.S.

    1990-12-31

    Project management controls are utilized to enhance the probability that a project will be successful. The control system used by a project manager can take many forms and can be applied at different times to varying degrees on a given project depending upon its complexity. The Consolidated Incineration Facility (CIF) is one project of many at the Savannah River Site (SRS). The United States Department of Energy Order 4700.1 is a project management system that is applied on a site-wide basis, thus including the CIF. The control system required by this order is proceduralized to ensure that it is applied in a consistent manner and will produce reliable results. These results provide the project manager with a correlation of both costs and schedule within the defined scope to adequately asses the status of the project. This is an iterative process and can be simply stated: plan, actual, variance, corrective action, prediction, and revision. This paper presents the basis for the project management controls applied at the Savannah River Site.

  7. Burlington Bottoms Wildlife Mitigation Project. Final Environmental Assessment/Management Plan and Finding of No Significant Impact.

    SciTech Connect

    Not Available

    1994-12-01

    Bonneville Power Administration (BPA) proposes to fund wildlife management and enhancement activities for the Burlington bottoms wetlands mitigation site. Acquired by BPA in 1991, wildlife habitat at Burlington bottoms would contribute toward the goal of mitigation for wildlife losses and inundation of wildlife habitat due to the construction of Federal dams in the lower Columbia and Willamette River Basins. Target wildlife species identified for mitigation purposes are yellow warbler, great blue heron, black-capped chickadee, red-tailed hawk, valley quail, spotted sandpiper, wood duck, and beaver. The Draft Management Plan/Environmental Assessment (EA) describes alternatives for managing the Burlington Bottoms area, and evaluates the potential environmental impacts of the alternatives. Included in the Draft Management Plan/EA is an implementation schedule, and a monitoring and evaluation program, both of which are subject to further review pending determination of final ownership of the Burlington Bottoms property.

  8. Environmental assessment: The Eden project

    NASA Astrophysics Data System (ADS)

    Roza, Christodoulaki

    Non domestic buildings account for about one-sixth of the U.K.'s entire C02 emissions and one-third of the building related ones 2 . Their proportion of energy consumption, particularly electricity, has also been growing 2 . New buildings are not necessarily better, with energy use often proving to be much higher than their designers anticipated 2 . Annual C02 emissions of two- and sometimes three- times design expectations are far from unusual, leaving a massive credibility gap 2 . These and other global environmental and human health related concerns have motivated an increasing number of designers, developers and building users to pursue more environmentally sustainable designs and construction strategies 5 . However, these buildings can be difficult to evaluate, since they are large in scale, complex in materials and function and temporally dynamic due to limited service life of building components and changing user requirements 5 . All of these factors make environmental assessment of the buildings challenging. Previous Post Occupancy Review of Buildings and their Engineering (PROBE) building investigations have uncovered serious shortcomings in facilities management, or at least mismatches between a building's management needs and the ability of the occupiers to provide the right level of management 1 . Consequently, large differences between energy performance expectations and outcomes can occur virtually unnoticed, while designers continue to repeat flawed descriptions 2 . This investigation attempts to evaluate the building's operation and to help achieving demonstrable improvements in terms of energy efficiency and occupant satisfaction. The scope of this study is to evaluate the actual environmental performance of a building notable for its advanced design. The Education Resource Centre at the Eden Project was selected to compare design expectations with post occupancy performance. This report contains a small-scale survey of user satisfaction with the

  9. Project Management for International Development.

    ERIC Educational Resources Information Center

    Axelrod, Valija M.; Magisos, Joel H.

    A project developed a content model for international project management training. It also compiled a bibliography of project management references, identified specific project management training needs based upon a survey of international sponsors and contractor personnel, and documented the training needs of international project managers. Data…

  10. Project Management for International Development.

    ERIC Educational Resources Information Center

    Axelrod, Valija M.; Magisos, Joel H.

    A project developed a content model for international project management training. It also compiled a bibliography of project management references, identified specific project management training needs based upon a survey of international sponsors and contractor personnel, and documented the training needs of international project managers. Data…

  11. Environmental management system.

    SciTech Connect

    Salinas, Stephanie A.

    2010-08-01

    The purpose of the Sandia National Laboratories/New Mexico (SNL/NM) Environmental Management System (EMS) is identification of environmental consequences from SNL/NM activities, products, and/or services to develop objectives and measurable targets for mitigation of any potential impacts to the environment. This Source Document discusses the annual EMS process for analysis of environmental aspects and impacts and also provides the fiscal year (FY) 2010 analysis. Further information on the EMS structure, processes, and procedures are described within the programmatic EMS Manual (PG470222).

  12. Environmental Assessment Lakeview Geothermal Project

    SciTech Connect

    Treis, Tania

    2012-04-30

    The Town of Lakeview is proposing to construct and operate a geothermal direct use district heating system in Lakeview, Oregon. The proposed project would be in Lake County, Oregon, within the Lakeview Known Geothermal Resources Area (KGRA). The proposed project includes the following elements: Drilling, testing, and completion of a new production well and geothermal water injection well; construction and operation of a geothermal production fluid pipeline from the well pad to various Town buildings (i.e., local schools, hospital, and Lake County Industrial Park) and back to a geothermal water injection well. This EA describes the proposed project, the alternatives considered, and presents the environmental analysis pursuant to the National Environmental Policy Act. The project would not result in adverse effects to the environment with the implementation of environmental protection measures.

  13. Ace Project as a Project Management Tool

    ERIC Educational Resources Information Center

    Cline, Melinda; Guynes, Carl S.; Simard, Karine

    2010-01-01

    The primary challenge of project management is to achieve the project goals and objectives while adhering to project constraints--usually scope, quality, time and budget. The secondary challenge is to optimize the allocation and integration of resources necessary to meet pre-defined objectives. Project management software provides an active…

  14. Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    McMakin, A.H.; Cannon, S.D.; Finch, S.M.

    1992-07-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The TSP consists of experts in environmental pathways, epidemiology, surface-water transport, ground-water transport, statistics, demography, agriculture, meteorology, nuclear engineering, radiation dosimetry, and cultural anthropology. Included are appointed technical members representing the states of Oregon, Washington, and Idaho, a representative of Native American tribes, and an individual representing the public. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates): Source terms, environmental transport, environmental monitoring data, demography, food consumption, and agriculture, and environmental pathways and dose estimates. Progress is discussed.

  15. Environmental Management System Plan

    SciTech Connect

    Fox, Robert; Thorson, Patrick; Horst, Blair; Speros, John; Rothermich, Nancy; Hatayama, Howard

    2009-03-24

    Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and other natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most current Executable Plan. These

  16. Hanford Environmental Dose Reconstruction Project Monthly Report

    SciTech Connect

    Finch, S.M.

    1991-02-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that populations could have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Pacific Northwest Laboratory (PNL) under the direction of an independent Technical Steering Panel (TSP). The TSP consists of experts in environmental pathways, epidemiology, surface-water transport, ground-water transport, statistics, demography, agriculture, meteorology, nuclear engineering, radiation dosimetry, and cultural anthropology. Included are appointed technical members representing the states of Oregon and Washington, cultural and technical experts nominated by the regional Native American tribes, and an individual representing the public. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demographics, agriculture, food habits; and environmental pathways and dose estimates. Project reports and references used in the reports are made available to the public in a public reading room. Project progress is documented in this monthly report, which is available to the public. 3 figs., 3 tabs.

  17. Project management tool

    NASA Technical Reports Server (NTRS)

    Maluf, David A. (Inventor); Gawdiak, Yuri O. (Inventor); Bell, David G. (Inventor); Gurram, Mohana M. (Inventor)

    2009-01-01

    A system for managing a project that includes multiple tasks and a plurality of workers. Input information includes characterizations based upon a human model, a team model and a product model. Periodic reports, such as a monthly report, a task plan report, a budget report and a risk management report, are generated and made available for display or further analysis. An extensible database allows searching for information based upon context and upon content.

  18. Environmental management activities

    SciTech Connect

    1997-07-01

    The Office of Environmental Management (EM) has been delegated the responsibility for the Department of Energy`s (DOE`s) cleanup of the nuclear weapons complex. The nature and magnitude of the waste management and environmental remediation problem requires the identification of technologies and scientific expertise from domestic and foreign sources. Within the United States, operational DOE facilities, as well as the decontamination and decommissioning of inactive facilities, have produced significant amounts of radioactive, hazardous, and mixed wastes. In order to ensure worker safety and the protection of the public, DOE must: (1) assess, remediate, and monitor sites and facilities; (2) store, treat, and dispose of wastes from past and current operations; and (3) develop and implement innovative technologies for environmental restoration and waste management. The EM directive necessitates looking beyond domestic capabilities to technological solutions found outside US borders. Following the collapse of the Soviet regime, formerly restricted elite Soviet scientific expertise became available to the West. EM has established a cooperative technology development program with Russian scientific institutes that meets domestic cleanup objectives by: (1) identifying and accessing Russian EM-related technologies, thereby leveraging investments and providing cost-savings; (2) improving access to technical information, scientific expertise, and technologies applicable to EM needs; and (3) increasing US private sector opportunities in Russian in EM-related areas.

  19. Environmental Management Science Program Workshop. Proceedings

    SciTech Connect

    1998-07-01

    The Department of Energy Office of Environmental Management (EM), in partnership with the Office of Energy Research (ER), designed, developed, and implemented the Environmental Management Science Program as a basic research effort to fund the scientific and engineering understanding required to solve the most challenging technical problems facing the government's largest, most complex environmental cleanup program. The intent of the Environmental Management Science Program is to: (1) Provide scientific knowledge that will revolutionize technologies and cleanup approaches to significantly reduce future costs, schedules, and risks. (2) Bridge the gap between broad fundamental research that has wide-ranging applications such as that performed in the Department's Office of Energy Research and needs-driven applied technology development that is conducted in Environmental Management's Office of Science and Technology. (3) Focus the nation's science infrastructure on critical Department of Energy environmental problems. In an effort to share information regarding basic research efforts being funded by the Environmental Management Science Program and the Environmental Management/Energy Research Pilot Collaborative Research Program (Wolf-Broido Program), this CD includes summaries for each project. These project summaries, available in portable document format (PDF), were prepared in the spring of 1998 by the principal investigators and provide information about their most recent project activities and accomplishments.

  20. Campus Energy Management Projects.

    ERIC Educational Resources Information Center

    Welzenbach, Lanora, Ed.

    This publication is a compilation of data concerning energy conservation measures at more than 60 colleges and universities in the United States and Canada. The data are presented for the information of all who are interested in the variety of ways in which institutions of higher education are managing energy. Project descriptions are divided into…

  1. Campus Energy Management Projects.

    ERIC Educational Resources Information Center

    Welzenbach, Lanora, Ed.

    This publication is a compilation of data concerning energy conservation measures at more than 60 colleges and universities in the United States and Canada. The data are presented for the information of all who are interested in the variety of ways in which institutions of higher education are managing energy. Project descriptions are divided into…

  2. Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Finch, S. M.; McMakin, A. H.

    1991-09-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation dose that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into five technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (i.e., dose estimates). The Source Terms Task develops estimates of radioactive emissions from Hanford facilities since 1944. The Environmental Transport Task reconstructs the movements of radioactive particles from the areas of release to populations. The Environmental Monitoring Data Task assemblies, evaluates and reports historical environmental monitoring data. The Demographics, Agriculture and Food Habits Task develops the data needed to identify the populations that could have been affected by the releases. The Environmental Pathways and Dose Estimates Task used the information derived from the other Tasks to estimate the radiation doses individuals could have received from Hanford radiation. This document lists the progress on this project as of September 1991. 3 figs., 2 tabs.

  3. Environmental Management and the New Politics of Western Water: The Animas-La Plata Project and Implementation of the Endangered Species Act.

    PubMed

    ELLISON

    1999-05-01

    / This paper explores the new politics of western water policy through an examination of the Animas-La Plata water project and implementation of the Endangered Species Act. It is suggested that the focus of western water programming has shifted from the source of distributed funds, the United States Congress, to the agencies originally created to deliver federal benefits because funding for new project construction has not been forthcoming. Under this new system, members of Congress continue to excite their constituents with promises of money for new project starts, while the administrative agencies perform the myriad duties needed to keep these projects alive. The result is that political objectives have replaced operational/management objectives in administrative processes. In this case, the author demonstrates how resource managers in the Bureau of Reclamation manipulated hydrological analysis to control administrative process, why their manipulation was unfair, and perhaps illegal, and why biologists from the US Fish and Wildlife Service accepted the analysis. While ostensibly protecting all interests, the result is that none of the objectives of federal water programming are achieved. KEY WORDS: Environmental management; Administrative politics; Water policy; Endangered Species Act; Animas-La Plata, Bureau of Reclamation

  4. Enhanced project management tool

    NASA Technical Reports Server (NTRS)

    Maluf, David A. (Inventor); Hsu, Chen-Jung (Inventor); Patel, Hemil N. (Inventor); Moh Hashim, Jairon C. (Inventor); Tran, Khai Peter B. (Inventor)

    2012-01-01

    A system for managing a project that includes multiple tasks and a plurality of workers. Input information includes characterizations based upon a human model, a team model and a product model. Periodic reports, such as one or more of a monthly report, a task plan report, a schedule report, a budget report and a risk management report, are generated and made available for display or further analysis or collection into a customized report template. An extensible database allows searching for information based upon context and upon content. Seven different types of project risks are addressed, including non-availability of required skill mix of workers. The system can be configured to exchange data and results with corresponding portions of similar project analyses, and to provide user-specific access to specified information.

  5. Report to Congress on the U.S. Department of Energy`s Environmental Management Science Program: Research funded and its linkages to environmental cleanup problems, and high out-year cost environmental management project descriptions. Volume 3 of 3 -- Appendix C

    SciTech Connect

    1998-04-01

    The Department of Energy`s Environmental Management Science Program (EMSP) serves as a catalyst for the application of scientific discoveries to the development and deployment of technologies that will lead to reduction of the costs and risks associated with cleaning up the nation`s nuclear complex. Appendix C provides details about each of the Department`s 82 high cost projects and lists the EMSP research awards with potential to impact each of these projects. The high cost projects listed are those having costs greater than $50 million in constant 1998 dollars from the year 2007 and beyond, based on the March 1998 Accelerating Cleanup: Paths to Closure Draft data, and having costs of quantities of material associated with an environmental management problem area. The high cost project information is grouped by operations office and organized by site and project code. Each operations office section begins with a list of research needs associated with that operations office. Potentially related research awards are listed by problem area in the Index of Research Awards by Environmental Management Problem Area, which can be found at the end of appendices B and C. For projects that address high risks to the public, workers, or the environment, refer also the Health/Ecology/Risk problem area awards. Research needs are programmatic or technical challenges that may benefit from knowledge gained through basic research.

  6. Environmental projects. Volume 7: Environmental resources document

    NASA Technical Reports Server (NTRS)

    Kushner, Len; Kroll, Glenn

    1988-01-01

    The Goldstone Deep Space Communications Complex (GDSCC) in Barstow, California, is part of the NASA Deep Space Network, one of the world's largest and most sensitive scientific telecommunications and radio navigation networks. Goldstone is managed, directed and operated by the Jet Propulsion Laboratory of Pasadena, California. The GDSCC includes five distinct operational sites: Echo, Venus, Mars, Apollo, and Mojave Base. Within each site is a Deep Space Station (DPS), consisting of a large dish antenna and its support facilities. As required by NASA directives concerning the implementation of the National Environmental Policy Act, each NASA field installation is to publish an Environmental Resources Document describing the current environment at the installation, including any adverse effects that NASA operations may have on the local environment.

  7. Project Management Methodology in Human Resource Management

    ERIC Educational Resources Information Center

    Josler, Cheryl; Burger, James

    2005-01-01

    When charged with overseeing a project, how can one ensure that the project will be completed on time, within budget, and to the satisfaction of everyone involved? In this article, the authors examine project management methodology as a means of ensuring that projects are conducted in a disciplined, well-managed and consistent manner that serves…

  8. Project Management Methodology in Human Resource Management

    ERIC Educational Resources Information Center

    Josler, Cheryl; Burger, James

    2005-01-01

    When charged with overseeing a project, how can one ensure that the project will be completed on time, within budget, and to the satisfaction of everyone involved? In this article, the authors examine project management methodology as a means of ensuring that projects are conducted in a disciplined, well-managed and consistent manner that serves…

  9. US - Former Soviet Union environmental management activities

    SciTech Connect

    1995-09-01

    The Office of Environmental Management (EM) has been delegated the responsibility for US DOE`s cleanup of nuclear weapons complex. The nature and the magnitude of the waste management and environmental remediation problem requires the identification of technologies and scientific expertise from domestic and foreign sources. This booklet makes comparisons and describes coordinated projects and workshops between the USA and the former Soviet Union.

  10. Environmental measurements for Project Overview

    SciTech Connect

    Chambers, D.H.; Ravizza, D.L.

    1995-09-28

    From July 10 to July 17, 1995, Project Overview was conducted at the Atlantic Undersea Test and Evaluation Center (AUTEC) at Andros Island, Bahamas. Part of the project was the collection and analysis of environmental data including wind measurements and ocean temperature and salinity profiles. This report describes these environmental measurements and presents the results of analysis performed in the field. The goal of the analysis was to calculate the Brunt-Vaeisaelae (BV) profile during operations, and provide operational recommendations from solutions of the Taylor-Goldstein (T-G) equation using the measured BV profile. Part 1 is a description of the sensors and their deployment. Part 2 discusses the analysis done in the field. Part 3 presents a summary of the wind measurements. Part 4 summarizes the ocean profiling results. Part 5 presents overall conclusions and recommendations for future experiments. The appendices include all of the ocean profiling results and wind measurements obtained in the field.

  11. Program and Project Management Framework

    NASA Technical Reports Server (NTRS)

    Butler, Cassandra D.

    2002-01-01

    The primary objective of this project was to develop a framework and system architecture for integrating program and project management tools that may be applied consistently throughout Kennedy Space Center (KSC) to optimize planning, cost estimating, risk management, and project control. Project management methodology used in building interactive systems to accommodate the needs of the project managers is applied as a key component in assessing the usefulness and applicability of the framework and tools developed. Research for the project included investigation and analysis of industrial practices, KSC standards, policies, and techniques, Systems Management Office (SMO) personnel, and other documented experiences of project management experts. In addition, this project documents best practices derived from the literature as well as new or developing project management models, practices, and techniques.

  12. RISK MANAGEMENT USING PROJECT RECON

    DTIC Science & Technology

    2016-11-28

    Risk Management Using Project Recon UNCLASSIFIED: Distribution Statement A. Approved for public release; distribution is unlimited. Bonnie Leece...Project Recon Lead What is Project Recon? • A web-based GOTS tool designed to capture, manage , and link Risks, Issues, and Opportunities in a...centralized database. • Project Recon (formerly Risk Recon) is designed to be used by all Program Management Offices, Integrated Project Teams and any

  13. Switchgear project meticulously managed.

    PubMed

    Baillie, Jonathan

    2015-04-01

    Electrical engineering and estates personnel at Sodexo--which manages a wide range of soft and hard facilities management services for five hospitals under a PFI contract at the Manchester Royal Infirmary--have successfully planned, managed, and co-ordinated, a complex electrical engineering project which saw high voltage (HV) switchgear in the site's main intake sub-station dismantled by the supplier to repair a potential earthing mechanism fault which would have prevented individual switchgear panels being shut down, to, for example, cater for renovation of electrical cabling or components cross the site's high voltage network. With detailed planning, including provision for bringing onto site temporary bulk generators, and the formulation of a 600-step switching programme, the replacement of potential faulty driver components in the disconnect mechanism for 20 HV switchgear panels was completed in just four weeks, with minimal interruption to the vast complex's power supply.

  14. NIF Project Management System Description

    SciTech Connect

    Wolfe, C.R.

    1997-08-01

    This document has been prepared for two purposes: 1. To demonstrate compliance with the project management requirements of DOE Order 430. 1, Life-Cycle Asset Management (LCAM). 2. To summarize in one place the approved Project documents which, taken as a whole, describe the NIF Project Management System.

  15. ENVIRONMENTAL DATA MANAGEMENT IN SUPPORT OF SHARING DATA AND MANAGEMENT

    EPA Science Inventory

    A data management system (DMS) was developed, tested and demonstrated to store and manage water quality and quantity (WQ2) data pertaining to U.S. Environmental Protection Agency/Office of Research and Development (EPA/ORD) research projects in standardized formats. This approach...

  16. ENVIRONMENTAL DATA MANAGEMENT IN SUPPORT OF SHARING DATA AND MANAGEMENT

    EPA Science Inventory

    A data management system (DMS) was developed, tested and demonstrated to store and manage water quality and quantity (WQ2) data pertaining to U.S. Environmental Protection Agency/Office of Research and Development (EPA/ORD) research projects in standardized formats. This approach...

  17. Environmental projects. Volume 3: Environmental compliance audit

    NASA Technical Reports Server (NTRS)

    1987-01-01

    The Goldstone Deep Space Communications Complex is part of NASA's Deep Space Network, one of the world's largest and most sensitive scientific telecommunications and radio navigation networks. Activities at Goldstone are carried out in support of six large parabolic dish antennas. In support of the national goal of the preservation of the environment and the protection of human health and safety, NASA, JPL and Goldstone have adopted a position that their operating installations shall maintain a high level of compliance with Federal, state, and local laws governing the management of hazardous substances, abestos, and underground storage tanks. A JPL version of a document prepared as an environmental audit of Goldstone operations is presented. Both general and specific items of noncompliance at Goldstone are identified and recommendations are provided for corrective actions.

  18. Maximum Capital Project Management.

    ERIC Educational Resources Information Center

    Adams, Matt

    2002-01-01

    Describes the stages of capital project planning and development: (1) individual capital project submission; (2) capital project proposal assessment; (3) executive committee; and (4) capital project execution. (EV)

  19. Maximum Capital Project Management.

    ERIC Educational Resources Information Center

    Adams, Matt

    2002-01-01

    Describes the stages of capital project planning and development: (1) individual capital project submission; (2) capital project proposal assessment; (3) executive committee; and (4) capital project execution. (EV)

  20. Nurse managers' challenges in project management.

    PubMed

    Suhonen, Marjo; Paasivaara, Leena

    2011-11-01

    To analyse the challenges that nurse managers meet in project management. Project management done by nurse managers has a significant role in the success of projects conducted in work units. The data were collected by open interviews (n = 14). The participants were nurse managers, nurses and public health nurses. Data analysis was carried out using qualitative content analysis. The three main challenges nurse managers faced in project management in health-care work units were: (1) apathetic organization and management, (2) paralysed work community and (3) cooperation between individuals being discouraged. Nurse managers' challenges in project management can be viewed from the perspective of the following paradoxes: (1) keeping up projects-ensuring patient care, (2) enthusiastic management-effective management of daily work and (3) supporting the work of a multiprofessional team-leadership of individual employees. It is important for nurse managers to learn to relate these paradoxes to one another in a positive way. Further research is needed, focusing on nurse managers' ability to promote workplace spirituality, nurse managers' emotional intelligence and their enthusiasm in small projects. © 2011 Blackwell Publishing Ltd.

  1. Environmental Management vitrification activities

    SciTech Connect

    Krumrine, P.H.

    1996-05-01

    Both the Mixed Waste and Landfill Stabilization Focus Areas as part of the Office of Technology Development efforts within the Department of Energy`s (DOE) Environmental Management (EM) Division have been developing various vitrification technologies as a treatment approach for the large quantities of transuranic (TRU), TRU mixed and Mixed Low Level Wastes that are stored in either landfills or above ground storage facilities. The technologies being developed include joule heated, plasma torch, plasma arc, induction, microwave, combustion, molten metal, and in situ methods. There are related efforts going into development glass, ceramic, and slag waste form windows of opportunity for the diverse quantities of heterogeneous wastes needing treatment. These studies look at both processing parameters, and long term performance parameters as a function of composition to assure that developed technologies have the right chemistry for success.

  2. The Field Project as a Tool for Teaching Environmental Psychology.

    ERIC Educational Resources Information Center

    Howells, Gary N.

    1978-01-01

    Describes a university class project designed to enable students to translate environmental research into action. Students focused on a conflict between state and county government over solid waste management. Outlines steps involved in such a project and discusses student involvement and the success of the project. (KC)

  3. BC Medication Management Project

    PubMed Central

    Henrich, Natalie; Tsao, Nicole; Gastonguay, Louise; Lynd, Larry

    2015-01-01

    Background: The BC Medication Management Project (BCMMP) was developed by the BC Ministry of Health and the BC Pharmacy Association. This pilot project ran from September 2010 to January 2012. Pharmacists reviewed patients’ medication histories, discussed best use of medications, provided education and monitored for adverse effects, developed a plan to deal with medication issues and created a best possible medication history. Methods: To evaluate the experience of participating in the BCMMP, challenges and strengths of the project and the alignment of these experiences with the overarching goals, focus groups and interviews were conducted with 6 stakeholder groups. Themes were compared within and across stakeholder type and descriptively analyzed. Results: A total of 88 people participated in the focus groups/interviews. Pharmacists stated that providing BCMMP services was professionally satisfying and concurred with patients that the service did benefit them. However, participating in the BCMMP was not seen as financially sustainable by pharmacy owners, and there were concerns about patient selection. Physicians expressed concerns about increased workload associated with the BCMMP, for which they were not compensated. The computer system and burden of documentation were identified as the greatest problems. Conclusions: The BCMMP pilot project was enthusiastically received by pharmacists and patients who felt that it benefited patients and moved the pharmacy profession in a positive direction. It was widely felt that the BCMMP could be successful and sustainable if the identified challenges are addressed. PMID:25983759

  4. In-situ mineralization of actinides for groundwater cleanup: Laboratory demonstration with soil from the Fernald Environmental Management Project

    SciTech Connect

    Nash, K.L.; Jensen, M.P.; Schmidt, M.A.

    1997-11-01

    An attractive approach to decreasing the probability of actinide migration in the subsurface is to transform the ions into less mobile forms by remote treatment. The process described herein relies on a polyfunctional organophosphorus complexant to sequester the mobile metal ions by complexation/cation exchange in the near term. The cation exchanger is designed to subsequently decompose, transforming the actinides into insoluble phosphate mineral forms as the medium of stable long-term isolation. This material can be generated in situ in the subsurface thus eliminating the need for excavation to immobilize the actinide ions. Previous investigations have identified a suitable organophosphorus reagent and profiled its decomposition kinetics, verified the formation of phosphate mineral phases upon decomposition of the reagent, determined solubility limits for appropriate metal phosphates under groundwater conditions, and examined the cation exchange behavior of the calcium salt of the organophosphorus reagent. In this report, the focus is on a laboratory-scale demonstration of the concept using a soil sample from the Fernald Environmental Management Plant.

  5. A Principle-Attribute Matrix for Environmentally Sustainable Management Education and Its Application: The Case for Change-Oriented Service-Learning Projects

    ERIC Educational Resources Information Center

    Rands, Gordon P.

    2009-01-01

    The environmental threats humanity faces have led businesses to increasingly commit to improve their environmental performance and to increasing attempts to address environmental issues in management education. This article presents a matrix of (a) principles that can underlie and (b) attributes that can be generated by environmentally focused…

  6. A Principle-Attribute Matrix for Environmentally Sustainable Management Education and Its Application: The Case for Change-Oriented Service-Learning Projects

    ERIC Educational Resources Information Center

    Rands, Gordon P.

    2009-01-01

    The environmental threats humanity faces have led businesses to increasingly commit to improve their environmental performance and to increasing attempts to address environmental issues in management education. This article presents a matrix of (a) principles that can underlie and (b) attributes that can be generated by environmentally focused…

  7. Project Management Plan

    SciTech Connect

    Not Available

    1988-01-01

    The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, 42 USC 7901 (hereinafter referred to as the Act''). Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial actions at 24 designated inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing sites. The Act, amended in January 1983, by Public Law 97-415, also authorizes DOE to perform remedial actions at vicinity properties in Edgemont, South Dakota. Cleanup of the Edgemont processing site is the responsibility of the Tennessee Valley Authority. This document describes the plan, organization, system, and methodologies used to manage the design, construction, and other activities required to clean up the designated sites and associated vicinity properties in accordance with the Act. The plan describes the objectives of the UMTRA Project, defines participants' roles and responsibilities, outlines the technical approach for accomplishing the objectives, and describes the planning and managerial controls to be used in integrating and performing the Project mission. 21 figs., 21 tabs.

  8. ISO 14000 environmental management standard

    SciTech Connect

    Block, M.R.

    1995-12-01

    National standards organizations around the world are developing an environmental management standard to help organizations address significant environmental aspects of their activities. This standard, designated ISO 14000, will provide guidance for environmental management systems: environmental audits: Environmental performance evaluation: Environmental labeling and life-cycle assessment. The environmental management system specification, the lynch-pin of ISO 14000, will be published as an international standard in early 1996. Audit documents will follow shortly thereafter. Although conformance to ISO 14000 will be voluntary, US multinational companies are likely to discover that failure to participate creates trade barriers in Europe. The Environmental Commission created by NAFTA also is considering whether to make adherence to ISO 14000 a condition of trade. This presentation will provide an understanding of the ISO process to create the standard, key elements of ISO 14000, and implications for US companies. Such an understanding will enable organizations to determine whether adoption of ISO 14000 is strategically sound.

  9. Office of Inspector General audit report on credit card usage at the Ohio Field Office and the Fernald and Miamisburg Environmental Management Projects

    SciTech Connect

    1999-03-01

    In 1994 the Department of Energy (Department) obtained the services of Rocky Mountain BankCard System, through the use of a General Services Administration contract, as a means for the Department and its contractors to make small purchases. The use of credit cards was expected to simplify small purchase procedures and improve cash management. The Ohio Field Office (Field Office) uses the credit card system and oversees usage by its area offices. Contractors under the Field Office also use the credit card system to make small purchases. The Office of Inspector General (OIG) has issued one audit report concerning the use of credit cards. In April 1996, the OIG issued Report WR-B-96-06, Audit of Bonneville Power Administration`s Management of Information Resources. The audit concluded that improvements could be made in implementing credit card and property procedures in Bonneville`s management of computer-related equipment. Specifically, many credit card purchases were made by employees whose authority to buy was not properly documented, and the purchasing files often lacked invoices that would show what was purchased. Additionally, some cardholders split purchases to avoid credit card limits. The objective of this audit was to determine whether the Field Office, Fernald and Miamisburg Environmental Management Projects, Fluor Daniel, and B and W were using credit cards for the appropriate purposes and within the limitations established by Federal and Departmental regulations.

  10. Project Management in Higher Education

    ERIC Educational Resources Information Center

    Alpert, Shannon Atkinson

    2011-01-01

    This study identified factors that influenced the use of project management in higher education research projects. Using a qualitative grounded theory approach that included in-depth interviews with assistant professors, the researcher examined how these individuals were using project management processes and tools and factors that enabled,…

  11. Project Management in Higher Education

    ERIC Educational Resources Information Center

    Alpert, Shannon Atkinson

    2011-01-01

    This study identified factors that influenced the use of project management in higher education research projects. Using a qualitative grounded theory approach that included in-depth interviews with assistant professors, the researcher examined how these individuals were using project management processes and tools and factors that enabled,…

  12. Hanford Environmental Dose Reconstruction Project. Monthly report, June 1992

    SciTech Connect

    Finch, S.M.; McMakin, A.H.

    1992-06-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Battelle Pacific Northwest Laboratories under contract with the Centers for Disease Control. The independent Technical Steering Panel (TSP) provides technical direction. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demography, food consumption, and agriculture; environmental pathways and dose estimates.

  13. Environmental Management, Hazard Management and Education.

    ERIC Educational Resources Information Center

    Lidstone, John G.

    This paper investigates the links between environmental management, hazard management, and education in Australia. The purpose of the paper is to show that hazards are a major aspect of the environment of all students, hazard education is fundamental to effective hazard management in a democratic society, and hazard education should be regarded as…

  14. Ideology and Environmental Risk Management.

    ERIC Educational Resources Information Center

    Miller, Alan

    1985-01-01

    Discusses the influence of ideology (including both psychological and political dimensions) on an individual's approach to environmental risk management. Compares and contrasts technocratic and humanist forms of environmental ideologies. Also reviews the implications of socio-political and psychological constraints on environmental decision…

  15. Hanford Environmental Dose Reconstruction Project: Monthly Report

    SciTech Connect

    Finch, S.M.

    1990-07-01

    This monthly report summarizes the technical progress and project status for the Hanford Environmental Dose Reconstruction (HEDR) Project being conducted at the Pacific Northwest Laboratory (PNL) under the direction of a Technical Steering Panel (TSP). The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): Source Terms, Environmental Transport, Environmental Monitoring Data, Demographics, Agriculture, Food Habits, and Environmental Pathways and Dose Estimates. 3 figs.

  16. The Environmental Education through Filmmaking Project

    ERIC Educational Resources Information Center

    Harness, Hallie; Drossman, Howard

    2011-01-01

    The environmental education through filmmaking project, a case study at an alternative US public high school, investigates environmental literacies of "at-risk" students who produced two short documentary films, one on recycling and one on water conservation. The filmmaking project sought to promote students' awareness of environmental issues and…

  17. The Environmental Education through Filmmaking Project

    ERIC Educational Resources Information Center

    Harness, Hallie; Drossman, Howard

    2011-01-01

    The environmental education through filmmaking project, a case study at an alternative US public high school, investigates environmental literacies of "at-risk" students who produced two short documentary films, one on recycling and one on water conservation. The filmmaking project sought to promote students' awareness of environmental issues and…

  18. Environmental management tools for the commercial marketplace

    SciTech Connect

    Schwartz, E.S.

    1999-07-01

    Real estate investors, lending institutions, developers and pension fund managers are among the growing ranks of real estate portfolio managers that insist on environmental audits or assessments prior to real property acquisitions. The economic feasibility of an investment may be affected both directly and indirectly by environmental factors. A failure to consider such factors may result in unrealistic forecasts for the timing and amount of a real estate project's expected investment return. Investors today seek new strategies to monitor the environmental health of their portfolios over the lifetime of the investment. Traditionally, Phase 1 and 2 environmental site assessments performed during pre-acquisition due diligence have been the principal means for gathering environmental information concerning a property. But while due diligence is an excellent tool for screening properties for recognized environmental conditions for the purpose of making an informed buying decision, many real estate managers and investors are turning to Environmental Management Systems (EMS) to manage and minimize environmental liabilities in the ongoing operation of properties they already own. An environmental management information system (EMIS) is often the best way to track the status and the findings of the EMS and communicate them to staff, management, and other stakeholders. A case of study of one commercial property owner's experience in implementing an EMIS has identified several pitfalls from which lessons were learned. These include obtaining cooperation from all levels of the property management teams in the EMS process, design of a generic system to fit a sometimes inconsistent organizational structure, and proportionate allocation of the costs of EMIS maintenance to the appropriate business units. There have also been many successes with the system they have designed.

  19. NPOESS Preparatory Project (NPP) Environmental Products

    NASA Astrophysics Data System (ADS)

    Grant, K. D.; Hughes, R.; Andreas, N. S.

    2010-12-01

    The National Oceanic and Atmospheric Administration (NOAA), Department of Defense (DoD), and National Aeronautics and Space Administration (NASA) are jointly acquiring the next-generation weather and environmental satellite system; the National Polar-orbiting Operational Environmental Satellite System (NPOESS). NPOESS replaces the current Polar-orbiting Operational Environmental Satellites (POES) managed by NOAA and the Defense Meteorological Satellite Program (DMSP) managed by the DoD. The NPOESS satellites carry a suite of sensors that collect meteorological, oceanographic, climatological, and solar-geophysical observations of the earth, atmosphere, and space. The ground data processing segment for NPOESS is the Interface Data Processing Segment (IDPS), developed by Raytheon Intelligence and Information Systems. The IDPS processes NPOESS satellite data to provide environmental data products (aka, Environmental Data Records or EDRs) to NOAA and DoD processing centers operated by the United States government. The IDPS will process EDRs beginning with the NPOESS Preparatory Project (NPP) and continuing through the lifetime of the NPOESS system. Northrop Grumman Aerospace Systems Algorithms and Data Products (A&DP) organization is responsible for the algorithms that produce the EDRs, including their quality aspects. Given a launch date for the NPP spacecraft on the near horizon and the need for users to become familiar with NPP environmental products, this paper will provide an overview of all the products generated by the IDPS and provided to NOAA’s Comprehensive Large Array-data Stewardship System (CLASS) for public distribution. It will discuss each of the 25 NPP EDRs in detail, including a description of the EDR, its size, coverage, measurement range, and expected uses.

  20. Breckinridge Project, initial effort. Report VI. Project Management Plan

    SciTech Connect

    1982-01-01

    Report VI presents a comprehensive plan for the management of the Breckinridge Project. For the purpose of this report, the project work is divided into five major project phases: Development, Engineering, Procurement, Construction, and Operations. The results of the Development Phase (Initial Effort) of the project are discussed in Section 1.0. This phase of the project was performed under a Cooperative Agreement with US Department of Energy and has produced 43 volumes of documentation. Fifteen volumes contain information of proprietary nature for patented processes and are therefore classified as Limited Access; however, twenty-eight volumes are not classified and are suitable for public dissemination. This Project Management Plan is a volume of the unclassified documentation. The other twenty-seven volumes contain comprehensive data on technical, financial, and environmental aspects of the project. Each of the four remaining project phases is presented starting with the extensive planning that will be performed and continuing through to the execution and completion of each phase. The major roles of the Operator, Ashland Synthetic Fuels, Inc. (ASFI), and the Managing Contractor are defined. Although a contract has not yet been executed with a Managing Contractor, the procedures, controls, organization and management philosophy of Bechtel Petroleum, Inc., are presented in this report as being representative of those used by contractors in the business of performing the engineering, procurement, and construction of projects of this size and complexity. The organizational structures of the Operator and the Managing Contractor are described, with designation of key project team personnel by job description and organization charts. Provisions for cost, schedule, and material control are described.

  1. Hanford Environmental Management Program Plan

    SciTech Connect

    DeFigh-Price, C.

    1989-09-01

    The Hanford Environmental Management Program (HEMP) was established in November 1986 by the US Department of Energy-Richland Operations Office (DOE-RL). Westinghouse Hanford Company (WHC) has been assigned responsibility to manage this program. The program`s goal is to integrate environmental activities such as reporting and planning and to facilitate compliance with environmental regulations. This document describes the scope of work funded by this program for Fiscal Year (FY) 1990, presents the prioritized tasks covered, the management structure in place and the assessment allocation methodology used to determine the FY 1990 assessments. 15 refs., 3 figs., 2 tabs.

  2. The use of environmental management teams for environmental management programs

    SciTech Connect

    Hoerauf, G.

    1997-08-01

    An environmental management team (EMT) is an organizational structure that can be instituted within any company. The EMT is approached from a systems engineering perspective where members representing a cross-section of a company`s engineering, manufacturing, procurement, environmental, safety, legal, management, distribution, and financial departments or divisions participate as team members. This new type of organizational structure is based upon total quality management and total environmental quality management principals. The EMT`s main focus is to develop an overall environmental strategy for the company. This strategy includes issues such as waste minimization, pollution prevention, environmental compliance, and health and safety. During the life cycle of a product or process, the EMT ensures that the associated life cycle activity of a product or program is in compliance with the company`s environmental strategy and federal, state, and local environmental laws and regulations. The EMT structure also provides an opportunity for the EMT representatives` departments to assess developing and existing processes for future pollution prevention activities in the context of the departments` areas of specialty. For example, the engineering department has a different area of expertise and environmental concerns than the financial department. From the departments` assessments, an overall pollution prevention strategy can be developed and implements for the company by the EMT.

  3. Climate Change Risk Management: CRE Adaptation Projects and the Risk Management Process

    EPA Pesticide Factsheets

    This document describes National Estuary Program partner projects that demonstrate how risk management can be successfully applied to address environmental challenges in our country’s coastal areas.

  4. Hanford Environmental Dose Reconstruction Project. Monthly report

    SciTech Connect

    Cannon, S.D.; Finch, S.M.

    1992-10-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The independent Technical Steering Panel (TSP) provides technical direction. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates):Source Terms, Environmental Transport, Environmental Monitoring Data, Demography, Food Consumption, and Agriculture, and Environmental Pathways and Dose Estimates.

  5. Hanford Environmental Dose Reconstruction Project Monthly Report

    SciTech Connect

    Finch, S.M.; McMakin, A.H.

    1992-03-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): Source Terms, Environmental Transport, Environmental Monitoring Data, Demography, Food Consumption, and Agriculture, and Environmental Pathways and Dose Estimates.

  6. Hanford Environmental Dose Reconstruction Project. Monthly report

    SciTech Connect

    Finch, S.M.; McMakin, A.H.

    1992-04-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): Source terms, environmental transport, environmental monitoring data, demography, food consumption, and agriculture, and environmental pathways and dose estimates.

  7. Hanford Environmental Dose Reconstruction Project monthly report

    SciTech Connect

    Finch, S.M.

    1991-10-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doeses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): Source terms; environmental transport; environmental monitoring data; demographics, agriculture, food habits; environmental pathways and dose estimates.

  8. Managing risk: An environmental engineering perspective

    SciTech Connect

    Arnold, M.A.; Weisberg, J.L.; Apel, S.R.

    1998-07-01

    Due to the nature of environmental investigation, remediation and design, the environmental engineer faces a large potential risk of receiving a claim on almost every project regardless of size. The liability for such a claim can be many times the negotiated fee for the project. While the risk of claims cannot be eliminated, the cost of such risk can be managed through an understanding of the nature of potential liabilities, the utilization of contractual allocation, and the purchase of insurance. Once claims are received, a proper use of appropriate legal defenses, will facilitate the resolution of such claims. While an exhaustive description of all risks encountered by an environmental engineer is beyond the scope of this paper, the following will address the risks most often encountered, which if not properly managed, can result in large costs to the engineer.

  9. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    SciTech Connect

    Vollmer, A.T.

    1993-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references.

  10. Application of Project Portfolio Management

    NASA Astrophysics Data System (ADS)

    Pankowska, Malgorzata

    The main goal of the chapter is the presentation of the application project portfolio management approach to support development of e-Municipality and public administration information systems. The models of how people publish and utilize information on the web have been transformed continually. Instead of simply viewing on static web pages, users publish their own content through blogs and photo- and video-sharing slides. Analysed in this chapter, ICT (Information Communication Technology) projects for municipalities cover the mixture of the static web pages, e-Government information systems, and Wikis. So, for the management of the ICT projects' mixtures the portfolio project management approach is proposed.

  11. NICA project management information system

    NASA Astrophysics Data System (ADS)

    Bashashin, M. V.; Kekelidze, D. V.; Kostromin, S. A.; Korenkov, V. V.; Kuniaev, S. V.; Morozov, V. V.; Potrebenikov, Yu. K.; Trubnikov, G. V.; Philippov, A. V.

    2016-09-01

    The science projects growth, changing of the efficiency criteria during the project implementation require not only increasing of the management specialization level but also pose the problem of selecting the effective planning methods, monitoring of deadlines and interaction of participants involved in research projects. This paper is devoted to choosing the project management information system for the new heavy-ion collider NICA (Nuclotron based Ion Collider fAcility). We formulate the requirements for the project management information system with taking into account the specifics of the Joint Institute for Nuclear Research (JINR, Dubna, Russia) as an international intergovernmental research organization, which is developed on the basis of a flexible and effective information system for the NICA project management.

  12. Hellsgate Winter Range : Wildlife Mitigation Project. Preliminary Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration.

    1995-01-01

    The Bonneville Power Administration proposes funding the Hellsgate Winter Range Wildlife Mitigation Project in cooperation with the Colville Convederated Tribes and Bureau of Indian Affairs. This Preliminary Environmental Assessment examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large project area. The Propose action is intended to meet the need for mitigation of wildlife and wild life habitat that was adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs.

  13. The Project Manager's Tool Kit

    NASA Technical Reports Server (NTRS)

    Cameron, W. Scott

    2003-01-01

    Project managers are rarely described as being funny. Moreover, a good sense of humor rarely seems to be one of the deciding factors in choosing someone to be a project manager, or something that pops up as a major discussion point at an annual performance review. Perhaps this is because people think you aren't serious about your work if you laugh. I disagree with this assessment, but that's not really my point. As I talk to people either pursuing a career in project management, or broadening their assignment to include project management, I encourage them to consider what tools they need to be successful. I suggest that they consider any strength they have to be part of their Project Management (PM) Tool Kit, and being funny could be one of the tools they need.

  14. 6 Project-Management Tips

    ERIC Educational Resources Information Center

    Demski, Jennifer

    2012-01-01

    When it comes to project management, the IT department is typically its own worst enemy. When project requests are pushed through the budgeting process by different departments, it's up to IT to make them all work. The staff is required to be "heroic" to get the project load done. People get to work over weekends and postpone their vacations. The…

  15. 6 Project-Management Tips

    ERIC Educational Resources Information Center

    Demski, Jennifer

    2012-01-01

    When it comes to project management, the IT department is typically its own worst enemy. When project requests are pushed through the budgeting process by different departments, it's up to IT to make them all work. The staff is required to be "heroic" to get the project load done. People get to work over weekends and postpone their vacations. The…

  16. Hanford Environmental Dose Reconstruction Project Monthly Report

    SciTech Connect

    Finch, S.M.

    1990-05-01

    This monthly report summarizes the technical progress and project status for the Hanford Environmental Dose Reconstruction (HEDR) Project being conducted at Pacific Northwest Laboratory (PNL) under the direction of a Technical Steering Panel (TSP). The TSP is composed of experts in numerous technical fields related to this project and represents the interests of the public. The US Department of Energy (DOE) funds the project. The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks address each of the primary steps in the path from radioactive releases to dose estimates source terms, environmental transport, environmental monitoring data, demographics, agriculture, and food habits, and environmental pathways and dose estimates.

  17. 75 FR 67351 - Environmental Management Advisory Board

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-02

    ... Environmental Management Advisory Board AGENCY: Department of Energy. ACTION: Notice of Open Teleconference. SUMMARY: This notice announces a teleconference of the Environmental Management Advisory Board (EMAB). The... is to provide the Assistant Secretary for Environmental Management (EM) with advice and...

  18. 40 CFR 262.103 - What is the scope of the laboratory environmental management standard?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... environmental management standard? 262.103 Section 262.103 Protection of Environment ENVIRONMENTAL PROTECTION... University Laboratories XL Project-Laboratory Environmental Management Standard § 262.103 What is the scope of the laboratory environmental management standard? The Laboratory Environmental Management Standard...

  19. Monterey Peninsula Water Supply Project Supplemental Draft Environmental Impact Report/Statement. Appendices. Monterey Peninsula Water Management District

    DTIC Science & Technology

    1991-08-01

    through 5 growing stages (or instars). Following the fifth instar stage the larvae pupate (August - November), and then overwinter in the leaf litter ...Robert Woodhouse Physiological Ecology Reconnaissance Study Oct. 1980 Recht, Hausrath Economic & Demand P-ojections & Associates i Oct. 1980 Recnt...Hausrath Financing Mechanisms & Revenue & Associates Sources Oct. 1980 Kevin Walsh Review of Seaside Ponding Project i Oct. 1980 Robert C. Lewis Flow

  20. The consequences of disposal of low-level radioactive waste from the Fernald Environmental Management Project: Report of the DOE/Nevada Independent Panel

    SciTech Connect

    Crowe, B.; Hansen, W.; Waters, R.; Sully, M.; Levitt, D.

    1998-04-01

    The Department of Energy (DOE) convened a panel of independent scientists to assess the performance impact of shallow burial of low-level radioactive waste from the Fernald Environmental Management Project, in light of a transportation incident in December 1997 involving this waste stream. The Fernald waste has been transported to the Nevada Test Site and disposed in the Area 5 Radioactive Waste Management Site (RWMS) since 1993. A separate DOE investigation of the incident established that the waste has been buried in stress-fractured metal boxes, and some of the waste contained excess moisture (high-volumetric water contents). The Independent Panel was charged with determining whether disposition of this waste in the Area 5 RWMS has impacted the conclusions of a previously completed performance assessment in which the site was judged to meet required performance objectives. To assess the performance impact on Area 5, the panel members developed a series of questions. The three areas addressed in these questions were (1) reduced container integrity, (2) the impact of reduced container integrity on subsidence of waste in the disposal pits and (3) excess moisture in the waste. The panel has concluded that there is no performance impact from reduced container integrity--no performance is allocated to the container in the conservative assumptions used in performance assessment. Similarly, the process controlling post-closure subsidence results primarily from void space within and between containers, and the container is assumed to degrade and collapse within 100 years.

  1. Total quality environmental management: Integrating environmental and quality management systems

    SciTech Connect

    Carley, J.A.; Kubala, G.; Hudson, T.

    1996-11-01

    As the oilfield industry strives to globally sustain continuous movement of environmental and quality performance, companies have come to realize Total Quality Environmental Management (TQEM) is essential in product research, development manufacturing and services. As our industry endeavors to continuously improve, more emphasis is being placed upon the management systems we apply such as ISO 14000 and ISO 9000. These standards are tools for improving environmental and quality performance, meeting customer requirements, and increasing profitability. lbs paper presents actual examples of the successful integration of environmental and quality management systems into an operational TQEM system. Also presented are pilot study evaluations of the draft ISO 14000 standards by two certified ISO 9000 facilities. Examples of continuous improvement and cross-functional teams as means to merge environment and quality management into the functions of process control, corrective and preventive action, document control, and waste management are presented. Results and improvements from facilities involved with TQEM discussed along with their strategies and progress in consolidating the environmental and quality programs into a single, viable management system. The case histories from various facilities demonstrate the implementation of TQEM and in TQEM promotes a cleaner environment, reduces costs, con- serves energy and raw materials, minimizes pollutants and wastes, and reduces redundant paperwork.

  2. Technical assistance to Ohio closure sites; Technologies to address leachate from the on-site disposal facility at Fernald Environmental Management Project, Ohio

    SciTech Connect

    Hazen, Terry

    2002-08-26

    On August 6-7, 2002, a Technical Assistance Team (''Team'') from the U.S. Department of Energy (DOE) Subsurface Contaminants Focus Area (SCFA) met with Fernald Environmental Management Project (FEMP) personnel in Ohio to assess approaches to remediating uranium-contaminated leachate from the On-Site Disposal Facility (OSDF). The Team was composed of technical experts from national labs, technology centers, and industry and was assembled in response to a request from the FEMP Aquifer Restoration Project. Dave Brettschneider of Fluor Fernald, Inc., requested that a Team of experts be convened to review technologies for the removal of uranium in both brine ion exchange regeneration solution from the Advanced Wastewater Treatment facility and in the leachate from the OSDF. The Team was asked to identify one or more technologies for bench-scale testing as a cost effective alternative to remove uranium so that the brine regeneration solution from the Advanced Waste Water Treatment facility and the leachate from the OSDF can be discharged without further treatment. The Team was also requested to prepare a recommended development and demonstration plan for the alternative technologies. Finally, the Team was asked to make recommendations on the optimal technical solution for field implementation. The Site's expected outcomes for this effort are schedule acceleration, cost reduction, and better long-term stewardship implementation. To facilitate consideration of the most appropriate technologies, the Team was divided into two groups to consider the brine and the leachate separately, since they represent different sources with different constraints on solutions, e.g., short-term versus very long-term and concentrated versus dilute contaminant matrices. This report focuses on the technologies that are most appropriate for the leachate from the OSDF. Upon arriving at FEMP, project personnel asked the Team to concentrate its efforts on evaluating potential technologies and

  3. Near-facility environmental monitoring quality assurance project plan

    SciTech Connect

    McKinney, S.M.

    1997-11-24

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near facility environmental monitoring performed by Waste Management Federal Services, Inc., Northwest Operations and supersedes WHC-EP-0538-2. This plan applies to all sampling and monitoring activities performed by waste management Federal Services, Inc., Northwest Operations in implementing facility environmental monitoring at the Hanford Site.

  4. Monterey Peninsula Water Supply Project Supplemental Draft Environmental Impact Report/Statement. Volume 2. Monterey Peninsula Water Management District

    DTIC Science & Technology

    1991-08-01

    Safety and Health 4-95Administration (Cal OSHA) 4.14.7 County of Monterey 4-96 4.14.8 Other Permits 4-96 CHAPTER 5: EVALUATION OF WATER SUPPLY...Creek Reservoir,! 14-15 14.2.8 25,000 AF Cafiada Reservoir 14-16 14.2.9 7 MGD Desalination Plant 14-16 14.2.10 No Project 14-17 CHAPTER IS: PUBLIC HEALTH ...Failure Analysis 15-5 15-2 Primary Standards Mandatory Health -Related Standards Established by the State of California, Department of Health Services 15-6

  5. Environmental Management Performance Report for December 1999

    SciTech Connect

    EDER, D.M.

    2000-02-16

    The purpose of the Environmental Management Performance Report (EMPR) is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's Environmental Management (EM) performance by: U. S. Department of Energy, Richland Operations Office, Project Hanford Management Contract (PHMC) through Fluor Hanford, Inc. (FHI) and its subcontractors, Environmental Restoration Contract through Bechtel Hanford, Inc. (BHI), and its subcontractors, and Pacific Northwest National Laboratories (PNNL) for EM and EM Science and Technology (S&T) Mission. This report is a monthly publication that summarizes EM Site performance under RL Operations Office. It is organized by the four sections listed above, with each section containing an Executive Summary and Area Performance Summaries. A listing of what is contained in the sections can be found in the Table of Contents.

  6. Environmental Management Performance Report November 2000

    SciTech Connect

    EDER, D.M.

    2000-11-01

    The purpose of the Environmental Management Performance Report (EMPR) is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's Environmental Management (EM) performance by: Project Hanford Management Contract (PHMC) through Fluor Hanford, Inc. (FH) and its subcontractors; Environmental Restoration Contract through Bechtel Hanford, Inc. (BHI), and its subcontractors; Pacific Northwest National Laboratories (PNNL) for Science and Technology support to the EM Mission; and Office of Safety Regulation of the TWRS Privatization Contractor. This report is a monthly publication that summarizes EM Site performance under RL Operations Office. It is organized by the four sections listed above, with each section containing an Executive Summary and Area Performance Summaries. A glossary of terms is provided at the end of this report for reference purposes.

  7. Environmental Management Performance Report April 2000

    SciTech Connect

    EDER, D.M.

    2000-04-01

    The purpose of the Environmental Management Performance Report (EMPR) is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's Environmental Management (EM) performance by: Project Hanford Management Contract (PHMC) through Fluor Hanford, Inc. (FHI) and its subcontractors; Environmental Restoration Contract through Bechtel Hanford, Inc. (BHI), and its subcontractors; Pacific Northwest National Laboratories (PNNL) for EM and EM Science and Technology (S and T) Mission; and Office of Safety Regulation of the TWRS Privatization Contractor. This report is a monthly publication that summarizes EM Site performance under RL Operations Office. It is organized by the four sections listed above, with each section containing an Executive Summary and Area Performance Summaries.

  8. Building Excellence in Project Execution: Integrated Project Management

    DTIC Science & Technology

    2015-04-30

    management practices that comprise the five overarching process areas outlined by the Project Management Institute ( PMI ): Project Initiation...definition changes from organization to organization; however, the Project Management Institute ( PMI ; 2013) defines a project as “a temporary endeavor...cycle. PMI (2013) states, Project Integration Management includes the processes and activities needed to identify, define, combine, unify, and

  9. Project Hanford management contract quality improvement project management plan

    SciTech Connect

    ADAMS, D.E.

    1999-03-25

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process.

  10. Computer-Based Environmental Management

    NASA Astrophysics Data System (ADS)

    Seppelt, Ralf

    2003-11-01

    This book provides professionals in environmental research and management with the information they need for computer modeling. Highlights include: A detailed summary of available software tools Presents cutting-edge mathematical methodology (e.g. fuzzy logic, hybrid Petri nets, optimum control theory) in a clear, understandable way Colour illustrations, flowcharts and worked examples that visualise and explain complex mathematical tasks. Case studies from various fields of application making it easier to apply simulation models for the solution of real-world problems Computer-Based Environmental Management is a unique reference for all environmental chemists, ecologists and agricultural scientists.

  11. Hanford Environmental Dose Reconstruction Project Monthly Report

    SciTech Connect

    Dennis, B.S.

    1990-04-01

    This monthly report summarizes the technical progress and project status for the Hanford Environmental Dose Reconstruction (HEDR) Project being conducted at Pacific Northwest Laboratory (PNL) under the direction of a Technical Steering Panel (TSP). The project is divided into the following technical tasks. These tasks address each of the primary steps in the path from radioactive releases to dose estimates: source terms, environmental transport, environmental monitoring data, demographics, agriculture, and food habits, and environmental pathways and dose estimates. The source terms task will develop estimates for radioactive emissions from Hanford facilities since 1944. These estimates will be based on historical measurements and production information. 1 fig., 1 tab.

  12. Hanford Environmental Dose Reconstruction Project Monthly Report

    SciTech Connect

    Finch, S.M.

    1990-06-01

    This monthly report summarizes the technical progress and project status for the Hanford Environmental Dose Reconstruction (HEDR) Project being conducted at Pacific Northwest Laboratory (PNL) under the direction of a Technical Steering Panel (TSP). The TSP is composed of experts in numerous technical fields related to this project and represents the interests of the public. The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that populations could have received from nuclear operations at Hanford since 1944. The project is divided into technical tasks which address each of the primary steps in the path from radioactive releases to dose estimates: source terms, environmental transport, environmental monitoring data, demographics, agriculture, and food habits, and environmental pathways and dose estimates.

  13. Environmental management: A system approach

    NASA Astrophysics Data System (ADS)

    Petak, William J.

    1981-05-01

    This paper presents a system framework whose purpose is to improve understanding of environmental management. By analyzing the links between elements of the environmental management system, it is possible to construct a model that aids thinking systematically about the decision-making subsystem, and other subsystems, of the entire environmental management system. Through a multidisciplinary environmental approach, each of the individual subsystems is able to adapt to threats and opportunities. The fields of government, market economics, social responsibility and ecology, for example, are so complex that it is extremely difficult to develop a framework that gives full consideration to all aspects. This paper, through the application of a highly idealized system framework, attempts to show the general relationships that exist between complex system elements.

  14. Managing a project's legacy: implications for organizations and project management

    NASA Technical Reports Server (NTRS)

    Cooper, Lynne P.; Hecht, Michael H.; Majchrzak, Ann

    2003-01-01

    Organizations that rely on projects to implement their products must find effective mechanisms for propagating lessons learned on one project throughout the organization. A broad view of what constitutes a project's 'legacy' is presented that includes not just the design products and leftover parts, but new processes, relationships, technology, skills, planning data, and performance metrics. Based on research evaluating knowledge reuse in innovative contexts, this paper presents an approach to project legacy management that focuses on collecting and using legacy knowledge to promote organizational learning and effective reuse, while addressing factors of post-project responsibility, information obsolescence, and the importance of ancillary contextual information. .

  15. Managing a project's legacy: implications for organizations and project management

    NASA Technical Reports Server (NTRS)

    Cooper, Lynne P.; Hecht, Michael H.; Majchrzak, Ann

    2003-01-01

    Organizations that rely on projects to implement their products must find effective mechanisms for propagating lessons learned on one project throughout the organization. A broad view of what constitutes a project's 'legacy' is presented that includes not just the design products and leftover parts, but new processes, relationships, technology, skills, planning data, and performance metrics. Based on research evaluating knowledge reuse in innovative contexts, this paper presents an approach to project legacy management that focuses on collecting and using legacy knowledge to promote organizational learning and effective reuse, while addressing factors of post-project responsibility, information obsolescence, and the importance of ancillary contextual information. .

  16. A Study on the Management Systematize of Environmental Restoration Business

    NASA Astrophysics Data System (ADS)

    Shimoike, Toshiki; Shimazaki, Toshikazu

    In recent years, it has been wrestled an investigation and the soil, groundwater contamination measures business (as follows: the environmental restoration project) that purify it and take measures against about pollution of the soil and groundwater led by a private enterprise. Japan has accumulated rich in restoration projects on the environment. The measures requires a hefty cost, it is clear that variety risks, management techniques are required to establish an efficient environmental restoration projects. In this paper, comparative study of the generation construction and environmentalrestoration projects, said the basic features of environmental restoration projects and trouble cases residents have been there. The types of features of the project for environmental restoration CM and demonstrated the business. To organize a variety of business risks and illustrates the concept of risk management. In addition, the figure of a management system based on its severity and the relationship between each elements and the business.

  17. Upper Mississippi River System - Environmental Management Program Definite Project Report (R1) for Construction. Monkey Chute Restoration Project. Pool 21, Upper Mississippi River, Marion County, Missouri.

    DTIC Science & Technology

    1987-02-01

    Primarily a Construction striatus Shinned migrant and to take place Hawk winter resident before winter - no impact Acipenser Lake Endangered Large rivers...Habitat not in fulvescens Sturgeon and lakes with project area - substrate of no impact sand & gravel Bartramia Upland Rare Native prairie; Habitat

  18. Near Facility Environmental Monitoring Quality Assurance Project Plan

    SciTech Connect

    MCKINNEY, S.M.

    2000-05-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near-facility environmental monitoring directed by Waste Management Technical Services and supersedes HNF-EP-0538-4. This plan applies to all sampling and monitoring activities performed by Waste Management Technical Services in implementing near-facility environmental monitoring at the Hanford Site. This Quality Assurance Project Plan is required by U.S. Department of Energy Order 5400.1 (DOE 1990) as a part of the Environmental Monitoring Plan (DOE-RL 1997) and is used to define: Environmental measurement and sampling locations used to monitor environmental contaminants near active and inactive facilities and waste storage and disposal sites; Procedures and equipment needed to perform the measurement and sampling; Frequency and analyses required for each measurement and sampling location; Minimum detection level and accuracy; Quality assurance components; and Investigation levels. Near-facility environmental monitoring for the Hanford Site is conducted in accordance with the requirements of U.S. Department of Energy Orders 5400.1 (DOE 1990), 5400.5 (DOE 1993), 5484.1 (DOE 1990), and 435.1 (DOE 1999), and DOE/EH-O173T (DOE 1991). It is Waste Management Technical Services' objective to manage and conduct near-facility environmental monitoring activities at the Hanford Site in a cost-effective and environmentally responsible manner that is in compliance with the letter and spirit of these regulations and other environmental regulations, statutes, and standards.

  19. Fuels planning: science synthesis and integration; environmental consequences fact sheet 12: Water Erosion Prediction Project (WEPP) Fuel Management (FuMe) tool

    Treesearch

    William Elliot; David Hall

    2005-01-01

    The Water Erosion Prediction Project (WEPP) Fuel Management (FuMe) tool was developed to estimate sediment generated by fuel management activities. WEPP FuMe estimates sediment generated for 12 fuel-related conditions from a single input. This fact sheet identifies the intended users and uses, required inputs, what the model does, and tells the user how to obtain the...

  20. Bangladesh Agro-Climatic Environmental Monitoring Project

    NASA Technical Reports Server (NTRS)

    Vermillion, C.; Maurer, H.; Williams, M.; Kamowski, J.; Moore, T.; Maksimovich, W.; Obler, H.; Gilbert, E.

    1988-01-01

    The Agro-Climatic Environmental Monitoring Project (ACEMP) is based on a Participating Agency Service Agreement (PASA) between the Agency for International Development (AID) and the National Oceanic and Atmospheric Administration (NOAA). In FY80, the Asia Bureau and Office of Federal Disaster Assistance (OFDA), worked closely to develop a funding mechanism which would meet Bangladesh's needs both for flood and cyclone warning capability and for application of remote sensing data to development problems. In FY90, OFDA provided for a High Resolution Picture Transmission (HRPT) receiving capability to improve their forecasting accuracy for cyclones, flooding and storm surges. That equipment is primarily intended as a disaster prediction and preparedness measure. The ACEM Project was designed to focus on the development applications of remote sensing technology. Through this Project, AID provided to the Bangladesh Government (BDG) the equipment, technical assistance, and training necessary to collect and employ remote sensing data made available by satellites as well as hydrological data obtained from data collection platforms placed in major rivers. The data collected will enable the BDG to improve the management of its natural resources.

  1. Establishment of environmental management program at Jordan Electricity Authority

    SciTech Connect

    Reuber, B.; Barker, D.; Bourbonniere, M.

    1996-12-31

    Network of Expertise for the Global Environment, a group representing 8 of the world`s leading electric utilities, in partnership with Jordan Electricity Authority (JEA), the national electric utility in the Hashemite Kingdom of Jordan, completed a project to establish an environmental management program at JEA. The project had two objectives: (1) to assist JEA in setting up an environmental management system to deal with environmental issues and to ensure compliance with regulations and standards, and (2) to conduct an environmental effects review at Jordan`s two largest electric generating facilities. The first objective was addressed by linking environmental issues at JEA, as determined by the environmental effects review, interviews and reports, to the draft ISO 14001 environmental management system specification. Use of ISO 14001 provided an internationally accepted standard that will assist JEA in fulfilling requirements of funding agencies. Seminars on environmental awareness and environmental auditing were delivered to support implementation of the environmental management system. The environmental effects review applied environmental auditing techniques to review environmental effects of JEA`s thermal power stations. The review provided a clear assessment of priorities for action as JEA established an environmental management program. A technical report and seminar on management of air emissions-immissions, a priority issue for JEA, were provided to complement the review.

  2. Project Management for Quality Improvement in Radiology.

    PubMed

    Larson, David B; Mickelsen, L Jake

    2015-11-01

    This article outlines a structured approach for applying project management principles to quality improvement in radiology. We highlight the framework we use for managing improvement projects in our department and review basic project management principles. Project management involves techniques for executing projects effectively and efficiently. We recognize the following phases for managing improvement projects: idea, project evaluation and selection, role assignment, planning, improvement, and sustaining improvement.

  3. Environmental Remediation Data Management Tools

    SciTech Connect

    Wierowski, J. V.; Henry, L. G.; Dooley, D. A.

    2002-02-26

    Computer software tools for data management can improve site characterization, planning and execution of remediation projects. This paper discusses the use of two such products that have primarily been used within the nuclear power industry to enhance the capabilities of radiation protection department operations. Advances in digital imaging, web application development and programming technologies have made development of these tools possible. The Interactive Visual Tour System (IVTS) allows the user to easily create and maintain a comprehensive catalog containing digital pictures of the remediation site. Pictures can be cataloged in groups (termed ''tours'') that can be organized either chronologically or spatially. Spatial organization enables the user to ''walk around'' the site and view desired areas or components instantly. Each photo is linked to a map (floor plan, topographical map, elevation drawing, etc.) with graphics displaying the location on the map and any available tour/component links. Chronological organization enables the user to view the physical results of the remediation efforts over time. Local and remote management teams can view these pictures at any time and from any location. The Visual Survey Data System (VSDS) allows users to record survey and sample data directly on photos and/or maps of areas and/or components. As survey information is collected for each area, survey data trends can be reviewed for any repetitively measured location or component. All data is stored in a Quality Assurance (Q/A) records database with reference to its physical sampling point on the site as well as other information to support the final closeout report for the site. The ease of use of these web-based products has allowed nuclear power plant clients to plan outage work from their desktop and realize significant savings with respect to dose and cost. These same tools are invaluable for remediation and decommissioning planning of any scale and for recording

  4. Hanford Environmental Dose Reconstruction Project. Monthly report, December 1991

    SciTech Connect

    Finch, S.M.; McMakin, A.H.

    1991-12-31

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Pacific Northwest Laboratory (PNL) under the direction of an independent Technical Steering Panel (TSP). The TSP consists of experts in environmental pathways, epidemiology, surface-water transport, ground-water transport, statistics, demography, agriculture, meteorology, nuclear engineering, radiation dosimetry, and cultural anthropology. Included are appointed technical members representing the states of Oregon and Washington, a representative of Native American tribes, and an individual representing the public. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on human (dose estimates): Source Terms; Environmental Transport; Environmental Monitoring Data; Demographics, Agriculture, Food Habits and; Environmental Pathways and Dose Estimates.

  5. Management Information System Project.

    ERIC Educational Resources Information Center

    Foley, Walter J.; Harr, Gordon G.

    The Management Information System (MIS) described in this report represents a plan to utilize modern management techniques to facilitate the goal of a learner-responsive school system. The MIS component is being developed to meet the need for the coordination of the resources of staff, facilities, and time with the long range planning and…

  6. 77 FR 4556 - Environmental Management Advisory Board

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-30

    ... Environmental Management (EM) on a broad range of corporate issues affecting the EM program. These issues... Environmental Management Advisory Board AGENCY: Office of Environmental Management, Department of Energy. ACTION... hereby given that the Environmental Management Advisory Board will be renewed for a two-year...

  7. Tucson Solar Village: Project management

    SciTech Connect

    Not Available

    1991-11-01

    The Tucson Solar Village is a Design/Build Project In Sustainable Community Development which responds to a broad spectrum of energy, environmental, and economic challenges. This project is designed for 820 acres of undeveloped State Trust Land within the Tucson city limits; residential population will be five to six thousand persons with internal employment provided for 1200. This is a 15 year project (for complete buildout and sales) with an estimated cost of $500 million. Details of the project are addressed with emphasis on the process and comments on its transferability.

  8. Bonneville - Hood River Vegetation Management Environmental Assessment

    SciTech Connect

    N /A

    1998-08-01

    To maintain the reliability of its electrical system, BPA, in cooperation with the U.S. Forest Service, needs to expand the range of vegetation management options used to clear unwanted vegetation on about 20 miles of BPA transmission line right-of-way between Bonneville Dam and Hood River; Oregon, within the Columbia Gorge National Scenic Area (NSA). We propose to continue controlling undesirable vegetation using a program of Integrated Vegetation Management (IVM) which includes manual, biological and chemical treatment methods. BPA has prepared an Environmental Assessment (EA) (DOE/EA-1257) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI.

  9. Bottomland Hardwood Ecosystem Management Project

    Treesearch

    John A. Stanturf; Marianne K. Burke; Calvin E. Meier

    1994-01-01

    Federal agency approaches to land management are undergoing a shift from parcel-specific concerns toward a more holistic, ecosystem management approach. Southern bottomland hardwood ecosystems provide important environmental services and commodity goods (Wharton et al. 1982), yet much of our knowledge of these systems comes from anecdotal information. The Bottomland...

  10. 7 CFR 3565.351 - Project management.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 15 2012-01-01 2012-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As a... Agency and complies with an approved management plan for the project. (b) Management plan. The...

  11. 7 CFR 3565.351 - Project management.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 15 2011-01-01 2011-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As a... Agency and complies with an approved management plan for the project. (b) Management plan. The...

  12. 7 CFR 3565.351 - Project management.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 15 2014-01-01 2014-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As a... Agency and complies with an approved management plan for the project. (b) Management plan. The...

  13. 7 CFR 3565.351 - Project management.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 15 2013-01-01 2013-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As a... Agency and complies with an approved management plan for the project. (b) Management plan. The...

  14. The Wildcat-San Pablo Creek Flood Control Project and Its Implications for the Design of Environmentally Sensitive Flood Management Plans

    Treesearch

    A. L. Riley

    1989-01-01

    In 1982 a coalition of neighborhood and environmental organizations used a community organizing strategy of the early 1960's, referred to as "advocacy planning" to substantially redesign a traditional structural type of joint federal and local flood control project on Wildcat and San Pablo Creeks in North Richmond, California. Using a combination of...

  15. Waste Management Project Contingency Analysis

    SciTech Connect

    Edward L. Parsons, Jr.

    1999-08-31

    The purpose of this report is to provide the office of Waste Management (WM) with recommended contingency calculation procedures for typical WM projects. Typical projects were defined as conventional construction-type activities that use innovative elements when necessary to meet the project objectives. Projects involve treatment, storage, and disposal of low level, mixed low level, hazardous, transuranic, and high level waste. Cost contingencies are an essential part of Total Cost Management. A contingency is an amount added to a cost estimate to compensate for unexpected expenses resulting from incomplete design, unforeseen and unpredictable conditions, or uncertainties in the project scope (DOE 1994, AACE 1998). Contingency allowances are expressed as percentages of estimated cost and improve cost estimates by accounting for uncertainties. The contingency allowance is large at the beginning of a project because there are more uncertainties, but as a project develops, the allowance shrinks to adjust for costs already incurred. Ideally, the total estimated cost remains the same throughout a project. Project contingency reflects the degree of uncertainty caused by lack of project definition, and process contingency reflects the degree of uncertainty caused by use of new technology. Different cost estimation methods were reviewed and compared with respect to terminology, accuracy, and Cost Guide standards. The Association for the Advancement of Cost Engineering (AACE) methods for cost estimation were selected to represent best industry practice. AACE methodology for contingency analysis can be readily applied to WM Projects, accounts for uncertainties associated with different stages of a project, and considers both project and process contingencies and the stage of technical readiness. As recommended, AACE contingency allowances taper off linearly as a project nears completion.

  16. Environmental Control Unit Harness Project

    NASA Technical Reports Server (NTRS)

    Oliva-Buisson, Yvette J.

    2014-01-01

    Testing four new Environmental Control Unit Harnesses for improved user comfort during SCAPE operations. Phase I, testing in a lab environment, Phase II will continue testing the best candidates in a field environment.

  17. Tunnel Vision in Environmental Management.

    ERIC Educational Resources Information Center

    Miller, Alan

    1982-01-01

    Discusses problem-solving styles in environmental management and the specific deficiencies in these styles that might be grouped under the label "tunnel vision," a form of selective attention contributing to inadequate problem-formulation, partial solutions to complex problems, and generation of additional problems. Includes educational…

  18. Hanford Environmental Dose Reconstruction Project Monthly Report

    SciTech Connect

    Dennis, B.S.

    1989-08-01

    This monthly report summarizes the technical progress and project status for the Hanford Environmental Dose Reconstruction (HEDR) Project being conducted at Pacific Northwest Laboratory (PNL) under the direction of a Technical Steering Panel (TSP). The TSP is composed of experts in numerous technical fields related to this project and represents the interests of the public. The US Department of Energy (DOE) funds the project. The project is divided into the following technical tasks. These tasks address each of the primary steps in the path from radioactive releases to dose estimates: source terms; environmental transport; environmental monitoring data; demographics, agriculture, and food habits; and environmental pathways and dose estimates. The source terms task will develop estimates of radioactive emissions from Hanford facilities since 1944. These estimates will be based on historical measurements and production information. The environmental transport task will reconstruct the movement of radioactive materials from the areas of release to populations. Movement via the atmosphere, surface water (Columbia River), and ground water will be studied. The environmental monitoring task will assemble, evaluate, and report historical environmental monitoring data. A major effort of this task is to separate Hanford as a source of radionuclide concentrations in the environment from concentrations due to natural sources and nuclear testing fallout.

  19. School Yard Environmental Projects: A Planning Primer.

    ERIC Educational Resources Information Center

    Megalos, Mark A.; And Others

    This guide describes how to establish successful trails, outdoor classrooms, or other environmental education improvements on rural and urban school grounds. Teachers are encouraged to promote the environmental project as a solution to an existing problem and to include all parties and stakeholders that can benefit from a coordinated environmental…

  20. Application of quality assurance standards to environmental projects

    SciTech Connect

    Richardson, T.L.; Lynch, J.E.; Chaudhary, T.B.

    1994-12-31

    Quality assurance (QA) is critical to every environmental project undertaken. While QA appears to be a cut-and-dried subject, it is actually an evolving issue. Environmental projects need high QA standards. The needs of the nuclear industry have driven most QA programs for the last several decades. Mom recently, the internationally accepted ISO-9000 standard, and the more recent E-4 standard (in draft), have been suggested as alternatives to achieving QA for environmental firms. These standards can be successfully integrated and implemented. However, this requires good up-front planning of the program`s purpose and function and commitments by management and staff to make it work. The purpose of this paper is to discuss how various QA standards can be appropriately applied to the demands of environmental projects.

  1. Software Project Management

    DTIC Science & Technology

    1989-07-01

    incorporated into the sys- Kotler88 tem. Several interesting concepts are presented, but Kotler , P. Marketing Planning: Analysis, Planning, the bulk of the...Metzger87 Mantei, M. "The Effect of Programming Team Metzger, Philip W. Managing Programming Structures on Programming Tasks." Comm. ACM People: A Personal... Philips . Software Engi- Classic approach in organization theory. neering. Englewood Cliffs, N.J.: Prentice-Hall, 1988. Shannon75 An industrial approach

  2. How Project Managers Really Manage: An Indepth Look at Some Managers of Large, Complex NASA Projects

    NASA Technical Reports Server (NTRS)

    Mulenburg, Gerald M.; Impaeilla, Cliff (Technical Monitor)

    2000-01-01

    This paper reports on a research study by the author that examined ten contemporary National Aeronautics and Space Administration (NASA) complex projects. In-depth interviews with the project managers of these projects provided qualitative data about the inner workings of the project and the methodologies used in establishing and managing the projects. The inclusion of a variety of space, aeronautics, and ground based projects from several different NASA research centers helped to reduce potential bias in the findings toward any one type of project, or technical discipline. The findings address the participants and their individual approaches. The discussion includes possible implications for project managers of other large, complex, projects.

  3. Examination of the relationship between project management critical success factors and project success of oil and gas drilling projects

    NASA Astrophysics Data System (ADS)

    Alagba, Tonye J.

    Oil and gas drilling projects are the primary means by which oil companies recover large volumes of commercially available hydrocarbons from deep reservoirs. These types of projects are complex in nature, involving management of multiple stakeholder interfaces, multidisciplinary personnel, complex contractor relationships, and turbulent environmental and market conditions, necessitating the application of proven project management best practices and critical success factors (CSFs) to achieve success. Although there is some practitioner oriented literature on project management CSFs for drilling projects, none of these is based on empirical evidence, from research. In addition, the literature has reported alarming rates of oil and gas drilling project failure, which is attributable not to technical factors, but to failure of project management. The aim of this quantitative correlational study therefore, was to discover an empirically verified list of project management CSFs, which consistent application leads to successful implementation of oil and gas drilling projects. The study collected survey data online, from a random sample of 127 oil and gas drilling personnel who were members of LinkedIn's online community "Drilling Supervisors, Managers, and Engineers". The results of the study indicated that 10 project management factors are individually related to project success of oil and gas drilling projects. These 10 CSFs are namely; Project mission, Top management support, Project schedule/plan, Client consultation, Personnel, Technical tasks, Client acceptance, Monitoring and feedback, Communication, and Troubleshooting. In addition, the study found that the relationships between the 10 CSFs and drilling project success is unaffected by participant and project demographics---role of project personnel, and project location. The significance of these findings are both practical, and theoretical. Practically, application of an empirically verified CSFs list to oil

  4. Project management at a university

    NASA Astrophysics Data System (ADS)

    Eaton, Joel A.

    2006-06-01

    Managing instrumentation projects, large or small, involves a number of common challenges-defining what is needed, desiging a system to provide it, producing it in an economical way, and putting it into service expeditiously. Doing these things in a university environoment provides unique challenges and opportunities not obtaining in the environment of large projects at NASA or national labs. I address this topic from the viewpoint of knowledge of two such projects, the development of OAO-2 at the University of Wisconsin and the relocation of Fairborn Observatory to the Patagonia Mountains in Arizona, as well as my own developemnt of the Tennessee State 2-m Automatic Spectroscopic Telescope. For the university environment, I argue for a more traditional management style that relies on more informal techniques than those used in large-scale projects conducted by big bureaucratic institutions. This style identifies what tasks are really necessary and eliminates as much wasteful overhead as possible. I discuss many of the formalities used in project management, such as formal reviews (PDR, CDR, etc.) and Gantt charts, and propose other ways of acheving the same results more effectively. The university environment acutely requires getting the right people to do the project, both in terms of their individual personalities, motivation, and technical skills but also in terms of their ability to get on with one another. Two critical challenges confronting those doing such projects in universities are 1) keeping the contractors on task (the major challenge to anyone doing project management) and 2) dealing with the purchasing systems in such institutions.

  5. 44 CFR 206.438 - Project management.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Project management. 206.438 Section 206.438 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF... Project management. (a) General. The State serving as grantee has primary responsibility for project...

  6. Hanford Environmental Dose Reconstruction Project. Monthly report

    SciTech Connect

    McMakin, A.H.; Cannon, S.D.; Finch, S.M.

    1992-07-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The TSP consists of experts in environmental pathways, epidemiology, surface-water transport, ground-water transport, statistics, demography, agriculture, meteorology, nuclear engineering, radiation dosimetry, and cultural anthropology. Included are appointed technical members representing the states of Oregon, Washington, and Idaho, a representative of Native American tribes, and an individual representing the public. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates): Source terms, environmental transport, environmental monitoring data, demography, food consumption, and agriculture, and environmental pathways and dose estimates. Progress is discussed.

  7. Hanford Environmental Dose Reconstruction Project: Monthly report, May 1989

    SciTech Connect

    Dennis, B.S.

    1989-01-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that populations could have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by Pacific Northwest Laboratory under the direction of independent Technical Steering Panel. The Technical Steering Panel consists of experts in environmental pathways, epidemiology, surface-water transport, ground-water transport, statistics, demography, agriculture, meteorology, nuclear engineering, radiation dosimetry, and cultural anthropology. Included among the members are appointed technical members representing the States of Oregon and Washington, cultural and technical experts nominated by the Indian tribes in the region, and an individual representing the public.

  8. Software Tools Streamline Project Management

    NASA Technical Reports Server (NTRS)

    2009-01-01

    Three innovative software inventions from Ames Research Center (NETMARK, Program Management Tool, and Query-Based Document Management) are finding their way into NASA missions as well as industry applications. The first, NETMARK, is a program that enables integrated searching of data stored in a variety of databases and documents, meaning that users no longer have to look in several places for related information. NETMARK allows users to search and query information across all of these sources in one step. This cross-cutting capability in information analysis has exponentially reduced the amount of time needed to mine data from days or weeks to mere seconds. NETMARK has been used widely throughout NASA, enabling this automatic integration of information across many documents and databases. NASA projects that use NETMARK include the internal reporting system and project performance dashboard, Erasmus, NASA s enterprise management tool, which enhances organizational collaboration and information sharing through document routing and review; the Integrated Financial Management Program; International Space Station Knowledge Management; Mishap and Anomaly Information Reporting System; and management of the Mars Exploration Rovers. Approximately $1 billion worth of NASA s projects are currently managed using Program Management Tool (PMT), which is based on NETMARK. PMT is a comprehensive, Web-enabled application tool used to assist program and project managers within NASA enterprises in monitoring, disseminating, and tracking the progress of program and project milestones and other relevant resources. The PMT consists of an integrated knowledge repository built upon advanced enterprise-wide database integration techniques and the latest Web-enabled technologies. The current system is in a pilot operational mode allowing users to automatically manage, track, define, update, and view customizable milestone objectives and goals. The third software invention, Query

  9. Environmental issues in operations management

    NASA Astrophysics Data System (ADS)

    Muthulingam, Suresh

    Adoption of sustainable operating practices is becoming an increasingly important issue for many organizations in the world today. In this dissertation, I use empirical methods to investigate factors that influence the adoption of sustainable practices and also identify issues that may hinder the adoption of such practices. I explore these issues in two diverse settings. In Chapter 1, I investigate the adoption and non-adoption of energy efficiency initiatives using a database of over 100,000 recommendations provided to more than 13,000 small and medium sized manufacturing firms. Even though the average payback across all recommendations is just over one year, many of these profitable opportunities are not implemented. Using a probit instrumental variable model, I identify four biases in the adoption of these recommendations. First, managers are myopic as they miss out on many profitable opportunities. Second, managers are more influenced by upfront costs than by net benefits when evaluating such initiatives. Third, adoption of a recommendation depends not only on its characteristics but also on the sequence in which the recommendations are presented. Adoption rates are higher for initiatives appearing early in a list of recommendations. Finally, adoption is not influenced by the number of options provided to decision makers. This contributes to the debate about whether or not choice overload occurs. We highlight decision biases previously unobserved in the Operations Management literature using field data rather than experimental data. We draw implications for enhancing adoption of energy efficiency initiatives and for other decision contexts where a collection of process improvement recommendations are made to firms. In Chapter 2, I examine the depth of adoption of the voluntary LEED (Leadership in Energy and Environmental Design) standards for green buildings. Depth of adoption refers to the extent to which the buildings adopt practices related to the standard

  10. 40 CFR 262.105 - What must be included in the laboratory environmental management plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... laboratory environmental management plan? 262.105 Section 262.105 Protection of Environment ENVIRONMENTAL... University Laboratories XL Project-Laboratory Environmental Management Standard § 262.105 What must be included in the laboratory environmental management plan? (a) Each University must include specific...

  11. Environmental Management Performance Report June 2000

    SciTech Connect

    EDER, D.M.

    2000-06-01

    The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-RL) a monthly summary of the Project Hanford Management Contractor's (PHMC) Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. In addition to project-specific information, it includes some PHMC-level data not detailed elsewhere in the report. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides a forward look to some of the upcoming key performance activities as extracted from the PHMC baseline. The remaining sections provide detailed performance data relative to each individual Project (e.g., Waste Management, Spent Nuclear Fuels, etc.), in support of Section A of the report. Unless otherwise noted, the Safety, Conduct of Operations, and Cost/Schedule data contained herein is as of April 30, 2000. All other information is updated as of May 19, unless otherwise noted.

  12. Environmental Management Performance Report September 2000

    SciTech Connect

    EDER, D.M.

    2000-09-01

    The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-RL) a monthly summary of the Project Hanford Management Contractor's (PHMC) Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. In addition to project-specific information, it includes some PHMC-level data not detailed elsewhere in the report. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides a forward look to some of the upcoming key performance activities as extracted from the PHMC baseline. The remaining sections provide detailed performance data relative to each individual Project (e.g., Waste Management, Spent Nuclear Fuels, etc.), in support of Section A of the report. Unless otherwise noted, the Safety, Conduct of Operations, and Cost/Schedule data contained herein is as of July 31, 2000. All other information is updated as of August 24, unless otherwise noted. ''Stoplight'' boxes are used to indicate at a glance the condition of a particular area. Green boxes denote on schedule. Yellows denote behind schedule but recoverable. Red is either missed or unrecoverable.

  13. Environmental management of tourist caves

    NASA Astrophysics Data System (ADS)

    Cigna, A. A.

    1993-06-01

    In terms of the flow of energy or mass, caves may be nearly closed systems. From the perspective of environmental protection and tourist cave management there are three categories: (1) caves where the natural energy fluxes far exceed those created by visitors, with the consequence that their environmental parameters are not affected by development (e.g., caves subject to frequent flooding); (2) caves where natural and tourist energy fluxes are of similar magnitude, where environmental parameters respond to visitors but return to their natural equilibrium afterwards; and (3) caves where visitor fluxes far exceed the natural fluxes, so that natural environmental equilibrium may be destroyed. The aim of responsible management is to limit the introduced fluxes to those that will not destroy the natural equilibrium established in such parameters as temperature, relative humidity, CO2 concentration, etc. A visitor capacity criterion is defined, and measured effects of visitors are demonstrated at Grotte di Castellana and Grotta Grande del Vento, category 2 caves that are the principal tourist caves of Italy.

  14. 75 FR 10500 - Environmental Assessment Prepared for Proposed Cape Wind Energy Project in Nantucket Sound, MA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-08

    ... Minerals Management Service Environmental Assessment Prepared for Proposed Cape Wind Energy Project in... review and comment of an EA and Draft FONNSI prepared by MMS for the Cape Wind Energy Project proposed... Environmental Impact Statement (FEIS) for the Cape Wind Energy Project. The FEIS assessed the...

  15. Meeting Environmental Guidelines and Completing School Construction Projects on Time and Within Budget.

    ERIC Educational Resources Information Center

    Preyar, Chester F.

    2000-01-01

    Taxpayers expect school-construction projects to be managed efficiently and in accordance with environmental standards. Phases include selecting an architect and site, stating project requirements, working with the architect, considering environmental factors, getting budget estimates and reviews, and choosing a contractor and project-schedule…

  16. The Project Manager Who Saved His Country

    NASA Technical Reports Server (NTRS)

    Baniszewski, John

    2008-01-01

    George Meade defeated Robert E. Lee, one of the greatest military leaders of all time. How did he do it? By using the skills he had learned as a project manager and outperforming Lee in all aspects of project management. Most project managers are familiar with the Project Management Institute's "Guide to the Project Management Body of Knowledge" (PMBOK), which identifies the skills and knowledge crucial to successful project management. Project managers need to make sure that all the elements of a project work together. They must develop and execute plans and coordinate changes to those plans. A project manager must define the scope of the work, break it into manageable pieces, verify and control what work is being done, and make sure that the work being done is essential to the project. Every project manager knows the challenges of schedule and the value of schedule slack. Project managers must get the resources they need and use them effectively. Project managers get the people they need and use their talents to achieve mission success. Projects generate huge amounts of information. A key to project success is getting sufficient and accurate information to the people who need it when they need it. Project managers must identify and quantify the risks that jeopardize project success and make plans for dealing with them. Studying Meade and Lee's performances at Gettysburg can help modern project managers appreciate, develop, and use the skills they need to be good project managers. The circumstances may be different, but the basic principles are the same. This dramatic event in American history shows how the skills of project management can be used in almost any situation. Former project manager George Meade used those skills to change the tide of the Civil War.

  17. Managing projects for high performance

    SciTech Connect

    Shepard, H.; Gonzalez, J.

    1984-02-01

    Interviews and observations by the authors in a number of large successful projects in the energy, chemicals and aerospace industries led to the formulation of a set of management principles which are presented here. They concern leadership style, organization structure and culture, spirit, team work, foresight and continuity.

  18. NEIC Environmental Management System (EMS) Policy

    EPA Pesticide Factsheets

    National Enforcement Investigations Center (NEIC) Environmental Management System (EMS) Policy. Identification and management of actual and potential environmental impacts of operations and decisions for the purpose of continual improvement of performance

  19. Environmental Management Performance Report 11/1999

    SciTech Connect

    EDER, D.M.

    2000-02-01

    The purpose of the Environmental Management Performance Report (EMPR) is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's Environmental Management performance by: US Department of Energy, Richland Operation

  20. TECHNICAL RISK RATING OF DOE ENVIRONMENTAL PROJECTS - 9153

    SciTech Connect

    Cercy, M; Ronald Fayfich, R; Steven P Schneider, S

    2008-12-12

    The U.S. Department of Energy's Office of Environmental Management (DOE-EM) was established to achieve the safe and compliant disposition of legacy wastes and facilities from defense nuclear applications. The scope of work is diverse, with projects ranging from single acquisitions to collections of projects and operations that span several decades and costs from hundreds of millions to billions US$. The need to be able to manage and understand the technical risks from the project to senior management level has been recognized as an enabler to successfully completing the mission. In 2008, DOE-EM developed the Technical Risk Rating as a new method to assist in managing technical risk based on specific criteria. The Technical Risk Rating, and the criteria used to determine the rating, provides a mechanism to foster open, meaningful communication between the Federal Project Directors and DOE-EM management concerning project technical risks. Four indicators (technical maturity, risk urgency, handling difficulty and resolution path) are used to focus attention on the issues and key aspects related to the risks. Pressing risk issues are brought to the forefront, keeping DOE-EM management informed and engaged such that they fully understand risk impact. Use of the Technical Risk Rating and criteria during reviews provides the Federal Project Directors the opportunity to openly discuss the most significant risks and assists in the management of technical risks across the portfolio of DOE-EM projects. Technical Risk Ratings can be applied to all projects in government and private industry. This paper will present the methodology and criteria for Technical Risk Ratings, and provide specific examples from DOE-EM projects.

  1. Technical Risk Rating of DOE Environmental Projects - 9153

    SciTech Connect

    Cercy, Michael; Fayfich, Ronald; Schneider, Steven

    2009-02-11

    The U.S. Department of Energy's Office of Environmental Management (DOE-EM) was established to achieve the safe and compliant disposition of legacy wastes and facilities from defense nuclear applications. The scope of work is diverse, with projects ranging from single acquisitions to collections of projects and operations that span several decades and costs from hundreds of millions to billions US$. The need to be able to manage and understand the technical risks from the project to senior management level has been recognized as an enabler to successfully completing the mission. In 2008, DOE-EM developed the Technical Risk Rating as a new method to assist in managing technical risk based on specific criteria. The Technical Risk Rating, and the criteria used to determine the rating, provides a mechanism to foster open, meaningful communication between the Federal Project Directors and DOE-EM management concerning project technical risks. Four indicators (technical maturity, risk urgency, handling difficulty and resolution path) are used to focus attention on the issues and key aspects related to the risks. Pressing risk issues are brought to the forefront, keeping DOE-EM management informed and engaged such that they fully understand risk impact. Use of the Technical Risk Rating and criteria during reviews provides the Federal Project Directors the opportunity to openly discuss the most significant risks and assists in the management of technical risks across the portfolio of DOE-EM projects. Technical Risk Ratings can be applied to all projects in government and private industry. This paper will present the methodology and criteria for Technical Risk Ratings, and provide specific examples from DOE-EM projects.

  2. The Project-Oriented Matrix and Instructional Development Project Management.

    ERIC Educational Resources Information Center

    Clymer, E. William

    1984-01-01

    Describes organizational factors that influence most instructional development projects, relates them to the features of the project-oriented matrix, and lists and explains specific matrix management strategies that instructional developers can use to solve common management problems. (MBR)

  3. The Project-Oriented Matrix and Instructional Development Project Management.

    ERIC Educational Resources Information Center

    Clymer, E. William

    1984-01-01

    Describes organizational factors that influence most instructional development projects, relates them to the features of the project-oriented matrix, and lists and explains specific matrix management strategies that instructional developers can use to solve common management problems. (MBR)

  4. Risk Management of NASA Projects

    NASA Technical Reports Server (NTRS)

    Sarper, Hueseyin

    1997-01-01

    Various NASA Langley Research Center and other center projects were attempted for analysis to obtain historical data comparing pre-phase A study and the final outcome for each project. This attempt, however, was abandoned once it became clear that very little documentation was available. Next, extensive literature search was conducted on the role of risk and reliability concepts in project management. Probabilistic risk assessment (PRA) techniques are being used with increasing regularity both in and outside of NASA. The value and the usage of PRA techniques were reviewed for large projects. It was found that both civilian and military branches of the space industry have traditionally refrained from using PRA, which was developed and expanded by nuclear industry. Although much has changed with the end of the cold war and the Challenger disaster, it was found that ingrained anti-PRA culture is hard to stop. Examples of skepticism against the use of risk management and assessment techniques were found both in the literature and in conversations with some technical staff. Program and project managers need to be convinced that the applicability and use of risk management and risk assessment techniques is much broader than just in the traditional safety-related areas of application. The time has come to begin to uniformly apply these techniques. The whole idea of risk-based system can maximize the 'return on investment' that the public demands. Also, it would be very useful if all project documents of NASA Langley Research Center, pre-phase A through final report, are carefully stored in a central repository preferably in electronic format.

  5. 1995 project of the year Hanford Environmental compliance project nomination

    SciTech Connect

    Kelly, J.R.

    1996-02-01

    The completion of the Hanford Environmental Compliance (HEC) Project in December 1995 brought to a successful close a long line of major contributions to environmental cleanup. Not since the early days of the Hanford Site during and shortly after World War 11 had such a large group of diverse construction activities, with a common goal, been performed at Hanford. Key to this success was the unique combination of 14 subprojects under the HEC Project which afforded the flexibility to address evolving subproject requirements. This strategy resulted in the accomplishment of the HEC Project stakeholders` objectives on an aggressive schedule, at a $33 million cost savings to the customer. The primary objectives of the HEC Project were to upgrade selected Hanford Site facilities and systems to bring them into compliance with current environmental standards and regulations. The HEC Project contributed significantly towards the Hanford site compliance with Clean Water Act, Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements. It provided, in part, those construction activities required to comply with those requirements in the areas of liquid and solid waste treatment and disposal, waste characterization, and groundwater monitoring.

  6. Environmental Protection Tools in Agricultural Management Works

    NASA Astrophysics Data System (ADS)

    Glowacka, Agnieszka; Taszakowski, Jaroslaw; Janus, Jaroslaw; Bozek, Piotr

    2016-10-01

    Land consolidation is a fundamental instrument for agricultural management. It facilitates comprehensive changes in the agricultural, social, and ecological domains. Consolidation and post-consolidation development-related investments are an opportunity to improve living conditions in rural areas, and simultaneously ensure its positive impact on the environment. One of the primary goals of consolidation, directly specified in the Act on land consolidation, is to improve farming conditions. In Poland, consolidation is possible due to EU funds: RDP 2007-2013 and RDP 2014-2020. In order for individual villages to be granted EU funds for consolidation and post-consolidation development under the Rural Development Programme 2014-2020, their consolidation has to implement actions with positive impact on the environment and the landscape. The goal of this paper is to analyse documentation in the form of assumptions for a land consolidation project enclosed to an RDP 2014-2020 grant application and project information sheets as the basis for environmental impact assessment in the context of detailed presentation of environmental protection solutions that ensure a positive impact of the project on the environment and landscape. The detailed study involved 9 villages in the Malopolskie Voivodeship, which applied for EU grants for land consolidation in the current financial perspective. The paper specifies the existing state of the analysed villages as regards the natural environment, lists agricultural management instruments that have a positive impact on the environment, and demonstrates that planning of actions aimed at environmental protection is a necessary element of assumptions for land consolidation projects.

  7. Data Management Plan for the Environmental Restoration Program

    SciTech Connect

    Bryd, P.

    1994-01-01

    The purpose of this handbook is to assist environmental restoration (ER) projects in the preparation of a data management implementation plan (DMIP). The DMIP identifies and documents an ER project's requirements and responsibilities for the management, quality assurance, use, and archival of its environmental data. It is important that a project complete its DMIP in the early planning phase to ensure that the necessary and appropriate data management systems and personnel are in place before the project begins acquiring data. All ER projects that collect or use environmental data at the Oak Ridge National Laboratory, the Oak Ridge Y-12 Plant, the Oak Ridge K-25 Site, the Paducah Gaseous Diffusion Plant, the Portsmouth Gaseous Diffusion Plant, and surrounding onsite and offsite areas must prepare a DMIP. Project types that often collect environmental data include surveillance and maintenance, decontamination and decommissioning, remedial design/remedial action, and remedial investigation/feasibility studies. Even if a project does little environmental data management, a DMIP is required to document this fact.

  8. Hanford Environmental Dose Reconstruction Project monthly report

    SciTech Connect

    McMakin, A.H., Cannon, S.D.; Finch, S.M.

    1992-09-01

    The objective of the Hanford Environmental Dose Reconstruction MDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The TSP consists of experts in envirorunental pathways. epidemiology, surface-water transport, ground-water transport, statistics, demography, agriculture, meteorology, nuclear engineering. radiation dosimetry. and cultural anthropology. Included are appointed members representing the states of Oregon, Washington, and Idaho, a representative of Native American tribes, and an individual representing the public. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates): Source Terms; Environmental Transport; Environmental Monitoring Data Demography, Food Consumption, and Agriculture; and Environmental Pathways and Dose Estimates.

  9. Hanford Environmental Dose Reconstruction Project monthly report

    SciTech Connect

    McMakin, A.H., Cannon, S.D.; Finch, S.M.

    1992-09-01

    The objective of the Hanford Environmental Dose Reconstruction MDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The TSP consists of experts in envirorunental pathways. epidemiology, surface-water transport, ground-water transport, statistics, demography, agriculture, meteorology, nuclear engineering. radiation dosimetry. and cultural anthropology. Included are appointed members representing the states of Oregon, Washington, and Idaho, a representative of Native American tribes, and an individual representing the public. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates): Source Terms; Environmental Transport; Environmental Monitoring Data Demography, Food Consumption, and Agriculture; and Environmental Pathways and Dose Estimates.

  10. 77 FR 15091 - Environmental Management Advisory Board

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-14

    ... Environmental Management Advisory Board AGENCY: Department of Energy. ACTION: Notice of Solicitation of Nominations for Appointment as a member of the Environmental Management Advisory Board. SUMMARY: In accordance... soliciting nominations for candidates to fill vacancies on the Environmental Management Advisory Board...

  11. Project management for nurses: guidelines for success.

    PubMed

    Berry, R

    1994-01-01

    Nurses often are called on to plan, participate in, and manage special projects. These projects and special assignments can be managed most effectively when business principles of project management are applied. This method includes defining the project, developing a work breakdown structure, assigning resources, calculating budget implications, presenting and negotiating the plan, implementation, and evaluation. When appropriately used, project management skills can have a major impact on the success or failure of a plan.

  12. Problems Encountered when Linking Environmental Management to Development Aid.

    ERIC Educational Resources Information Center

    O'Riordan, Timothy

    1981-01-01

    Environmental management is defined and four barriers to its incorporation into economic growth as related to Third World development assistance are identified. Recommends incorporating environmental and social assessments in project planning, improving administration coordination, and developing new training skills and diplomacy. (DC)

  13. Computer Aided Management for Information Processing Projects.

    ERIC Educational Resources Information Center

    Akman, Ibrahim; Kocamustafaogullari, Kemal

    1995-01-01

    Outlines the nature of information processing projects and discusses some project management programming packages. Describes an in-house interface program developed to utilize a selected project management package (TIMELINE) by using Oracle Data Base Management System tools and Pascal programming language for the management of information system…

  14. 7 CFR 3565.351 - Project management.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As a... and local laws; and (11) That the borrower provides management satisfactory to the lender and to the...

  15. Computer Aided Management for Information Processing Projects.

    ERIC Educational Resources Information Center

    Akman, Ibrahim; Kocamustafaogullari, Kemal

    1995-01-01

    Outlines the nature of information processing projects and discusses some project management programming packages. Describes an in-house interface program developed to utilize a selected project management package (TIMELINE) by using Oracle Data Base Management System tools and Pascal programming language for the management of information system…

  16. Environmental Assessment : Happy Valley [Substation Project].

    SciTech Connect

    United States. Bonneville Power Administration.

    1982-05-01

    The proposed Happy Valley project consists of construction of a new BPA customer service 69-kV substation south of Sequim in Clallam County, Washington. A tie line, to be constructed by the customer as part of this project, will link the new BPA facility to the existing customer's transmission system in the area. This project responds to rapid load growth in the Olympic Peninsula, and will strengthen the existing BPA system and interconnected utility systems. It will reduce transmission losses presently incurred, especially on the BPA system supplying power to the Olympic Peninsula. This report describes the potential environmental impact of the proposed actions. 2 figs., 1 tab.

  17. A science data gateway for environmental management: A SCIENCE DATA GATEWAY FOR ENVIRONMENTAL MANAGEMENT

    SciTech Connect

    Agarwal, Deborah A.; Faybishenko, Boris; Freedman, Vicky L.; Krishnan, Harinarayan; Kushner, Gary; Lansing, Carina; Porter, Ellen; Romosan, Alexandru; Shoshani, Arie; Wainwright, Haruko; Weidmer, Arthur; Wu, Kesheng

    2015-10-12

    Science data gateways are effective in providing complex science data collections to the world-wide user communities. In this paper we describe a gateway for the Advanced Simulation Capability for Environmental Management (ASCEM) framework. Built on top of established web service technologies, the ASCEM data gateway is specifically designed for environmental modeling applications. Its key distinguishing features include: (1) handling of complex spatiotemporal data, (2) offering a variety of selective data access mechanisms, (3) providing state of the art plotting and visualization of spatiotemporal data records, and (4) integrating seamlessly with a distributed workflow system using a RESTful interface. ASCEM project scientists have been using this data gateway since 2011.

  18. Mounds View Environmental Education Project, Report #1.

    ERIC Educational Resources Information Center

    Budde, Duane

    Prepared for the 1971 National Science Teachers Association (NSTA) Annual Meeting, this collection of ideas, activities, and unit plans from the Mounds View Environmental Education Project would be useful for junior and senior high school teachers and curriculum planners. Content includes: (1) a senior high course outline and daily lesson plans…

  19. Environmental Science Projects. LC Science Tracer Bullet.

    ERIC Educational Resources Information Center

    Carter, Constance, Comp.

    This bibliography cites sources to assist middle, junior, and senior high school students and teachers in planning, preparing, and executing science fair projects in the environmental sciences. In addition, a few books with experiments suitable for elementary grade students are included. The listing includes: (1) 5 introductory texts; (2) 31…

  20. Environmental Science Projects. LC Science Tracer Bullet.

    ERIC Educational Resources Information Center

    Carter, Constance, Comp.

    Sources to assist junior and senior high school students and teachers in planning, preparing, and executing science fair projects in the environmental sciences are cited in this bibliography that includes a few books with experiments suitable for elementary grade students. Information and/or citations are provided under the following headings: (1)…

  1. Project Approval, Environmental Assessment and Public Participation.

    ERIC Educational Resources Information Center

    Elder, P. S.

    1982-01-01

    Presents a case study of a heavy oil project proposed by Esso Resources Canada Limited at Cold Lake, Alberta, Canada. Focuses on the approval process, environmental and social impact assessments, and public participation. Evaluates the case and makes recommendations concerning the approval process. (DC)

  2. 44 CFR 206.438 - Project management.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false Project management. 206.438 Section 206.438 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF... Project management. (a) General. The State serving as grantee has primary responsibility for...

  3. 44 CFR 206.438 - Project management.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 44 Emergency Management and Assistance 1 2014-10-01 2014-10-01 false Project management. 206.438 Section 206.438 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF... Project management. (a) General. The State serving as grantee has primary responsibility for...

  4. 44 CFR 206.438 - Project management.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 44 Emergency Management and Assistance 1 2012-10-01 2011-10-01 true Project management. 206.438 Section 206.438 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF... Project management. (a) General. The State serving as grantee has primary responsibility for...

  5. 44 CFR 206.438 - Project management.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 44 Emergency Management and Assistance 1 2013-10-01 2013-10-01 false Project management. 206.438 Section 206.438 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF... Project management. (a) General. The State serving as grantee has primary responsibility for...

  6. Hanford Environmental Dose Reconstruction Project. Monthly report

    SciTech Connect

    Finch, S. M.; McMakin, A. H.

    1991-09-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation dose that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into five technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (i.e., dose estimates). The Source Terms Task develops estimates of radioactive emissions from Hanford facilities since 1944. The Environmental Transport Task reconstructs the movements of radioactive particles from the areas of release to populations. The Environmental Monitoring Data Task assemblies, evaluates and reports historical environmental monitoring data. The Demographics, Agriculture and Food Habits Task develops the data needed to identify the populations that could have been affected by the releases. The Environmental Pathways and Dose Estimates Task used the information derived from the other Tasks to estimate the radiation doses individuals could have received from Hanford radiation. This document lists the progress on this project as of September 1991. 3 figs., 2 tabs.

  7. Environmental Management Performance Report May 2000

    SciTech Connect

    EDER, D.M.

    2000-05-01

    The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-FU) a report of the Project Hanford Management Contractors' (PHMC)' Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. This report is a monthly publication that summarizes the PHMC EM performance. In addition, it includes some PHMC-level data not detailed elsewhere in the report. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides a forward look to some of the upcoming key performance activities as extracted from the PHMC baseline. The remaining sections provide detailed performance data relative to each individual Project (e.g., Waste Management, Spent Nuclear Fuels, etc.), in support of Section A of the report. A glossary of terms is provided at the end of this report for reference purposes. Unless otherwise noted, the Safety, Conduct of Operations, Metrics, and Cost/Schedule data contained herein is as of March 31, 2000. All other information is updated as noted.

  8. Environmental cost of using poor decision metrics to prioritize environmental projects.

    PubMed

    Pannell, David J; Gibson, Fiona L

    2016-04-01

    Conservation decision makers commonly use project-scoring metrics that are inconsistent with theory on optimal ranking of projects. As a result, there may often be a loss of environmental benefits. We estimated the magnitudes of these losses for various metrics that deviate from theory in ways that are common in practice. These metrics included cases where relevant variables were omitted from the benefits metric, project costs were omitted, and benefits were calculated using a faulty functional form. We estimated distributions of parameters from 129 environmental projects from Australia, New Zealand, and Italy for which detailed analyses had been completed previously. The cost of using poor prioritization metrics (in terms of lost environmental values) was often high--up to 80% in the scenarios we examined. The cost in percentage terms was greater when the budget was smaller. The most costly errors were omitting information about environmental values (up to 31% loss of environmental values), omitting project costs (up to 35% loss), omitting the effectiveness of management actions (up to 9% loss), and using a weighted-additive decision metric for variables that should be multiplied (up to 23% loss). The latter 3 are errors that occur commonly in real-world decision metrics, in combination often reducing potential benefits from conservation investments by 30-50%. Uncertainty about parameter values also reduced the benefits from investments in conservation projects but often not by as much as faulty prioritization metrics. © 2016 Society for Conservation Biology.

  9. Managing MDO Software Development Projects

    NASA Technical Reports Server (NTRS)

    Townsend, J. C.; Salas, A. O.

    2002-01-01

    Over the past decade, the NASA Langley Research Center developed a series of 'grand challenge' applications demonstrating the use of parallel and distributed computation and multidisciplinary design optimization. All but the last of these applications were focused on the high-speed civil transport vehicle; the final application focused on reusable launch vehicles. Teams of discipline experts developed these multidisciplinary applications by integrating legacy engineering analysis codes. As teams became larger and the application development became more complex with increasing levels of fidelity and numbers of disciplines, the need for applying software engineering practices became evident. This paper briefly introduces the application projects and then describes the approaches taken in project management and software engineering for each project; lessons learned are highlighted.

  10. Marion Industrial Substation Project : Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-04-01

    Consumers Power, Inc. (CPI), proposes to construct a new distribution substation under the existing Bonneville Power Administration (BPA) Albay-Lebanon transmission line near the city of Albany in Linn County, Oregon. BPA is proposing to grant a new Point of Delivery to CPI at this substation. The purpose of the project is to serve the developing industrial needs in the Marion Industrial Park and on the 550 acres of nearby land within CPI`s service area that are zoned for residential use. CPI prepared, and the Rural Electrification Administration (REA) has approved a Borrower`s Environmental Report (BER) which addresses this action along with several other proposed projects in the CPI service area. Portions of this BER are summarized in this brief EA. BPA is preparing its own EA since Department of Energy National Environmental Policy Act (NEPA) guidelines require additional environmental concerns to be addressed than are required by REA`s NEPA guidelines.

  11. Marion Industrial Substation Project : Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-04-01

    Consumers Power, Inc. (CPI), proposes to construct a new distribution substation under the existing Bonneville Power Administration (BPA) Albay-Lebanon transmission line near the city of Albany in Linn County, Oregon. BPA is proposing to grant a new Point of Delivery to CPI at this substation. The purpose of the project is to serve the developing industrial needs in the Marion Industrial Park and on the 550 acres of nearby land within CPI's service area that are zoned for residential use. CPI prepared, and the Rural Electrification Administration (REA) has approved a Borrower's Environmental Report (BER) which addresses this action along with several other proposed projects in the CPI service area. Portions of this BER are summarized in this brief EA. BPA is preparing its own EA since Department of Energy National Environmental Policy Act (NEPA) guidelines require additional environmental concerns to be addressed than are required by REA's NEPA guidelines.

  12. Klickitat Cogeneration Project : Final Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration; Klickitat Energy Partners

    1994-09-01

    To meet BPA`s contractual obligation to supply electrical power to its customers, BPA proposes to acquire power generated by Klickitat Cogeneration Project. BPA has prepared an environmental assessment evaluating the proposed project. Based on the EA analysis, BPA`s proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 for the following reasons: (1)it will not have a significant impact land use, upland vegetation, wetlands, water quality, geology, soils, public health and safety, visual quality, historical and cultural resources, recreation and socioeconomics, and (2) impacts to fisheries, wildlife resources, air quality, and noise will be temporary, minor, or sufficiently offset by mitigation. Therefore, the preparation of an environmental impact statement is not required and BPA is issuing this FONSI (Finding of No Significant Impact).

  13. Implementation of an Intelligent Tutorial System for Socioenvironmental Management Projects

    ERIC Educational Resources Information Center

    Vera, Gil; Daniel, Víctor; Awad, Gabriel

    2015-01-01

    The agents responsible of execution of physical infrastructure projects of the Government of Antioquia must know the theories and concepts related to the socio-environmental management of physical infrastructure projects. In the absence of tools and the little information on the subject, it is necessary to build a m-learning tool to facilitate to…

  14. Breakthrough Propulsion Physics Project: Project Management Methods

    NASA Technical Reports Server (NTRS)

    Millis, Marc G.

    2004-01-01

    To leap past the limitations of existing propulsion, the NASA Breakthrough Propulsion Physics (BPP) Project seeks further advancements in physics from which new propulsion methods can eventually be derived. Three visionary breakthroughs are sought: (1) propulsion that requires no propellant, (2) propulsion that circumvents existing speed limits, and (3) breakthrough methods of energy production to power such devices. Because these propulsion goals are presumably far from fruition, a special emphasis is to identify credible research that will make measurable progress toward these goals in the near-term. The management techniques to address this challenge are presented, with a special emphasis on the process used to review, prioritize, and select research tasks. This selection process includes these key features: (a) research tasks are constrained to only address the immediate unknowns, curious effects or critical issues, (b) reliability of assertions is more important than the implications of the assertions, which includes the practice where the reviewers judge credibility rather than feasibility, and (c) total scores are obtained by multiplying the criteria scores rather than by adding. Lessons learned and revisions planned are discussed.

  15. On Services for Collaborative Project Management

    NASA Astrophysics Data System (ADS)

    Ollus, Martin; Jansson, Kim; Karvonen, Iris; Uoti, Mikko; Riikonen, Heli

    This paper presents an approach for collaborative project management. The focus is on the support of collaboration, communication and trust. Several project management tools exist for monitoring and control the performance of project tasks. However, support of important intangible assets is more difficult to find. In the paper a leadership approach is identified as a management means and the use of new IT technology, especially social media for support of leadership in project management is discussed.

  16. Update on Service Management project

    ScienceCinema

    None

    2016-07-12

    GS and IT Service Management project status meeting -------------------------------------------------------------------------- Distribution: Sigurd Lettow, Frederic Hemmer, Thomas Pettersson, David Foster, Matti Tiirakari, GS⁢ Service Providers When and where: Thursday 2nd September at 10:00-11:30 in IFiltration Plant (222-R-001) Dear All, We would like to inform you about progress made on different topics like the Service Catalogue, the new Service Management Tool and the Service Desk. We would also like to present the plan for when we hope to "go live" and what this will mean for all of you running and providing services today. We will need your active support and help in the coming months to make this happen. GS⁢ Service Management Teams Reinoud Martens, Mats Moller

  17. Update on Service Management project

    SciTech Connect

    2011-02-28

    GS and IT Service Management project status meeting -------------------------------------------------------------------------- Distribution: Sigurd Lettow, Frederic Hemmer, Thomas Pettersson, David Foster, Matti Tiirakari, GS⁢ Service Providers When and where: Thursday 2nd September at 10:00-11:30 in IFiltration Plant (222-R-001) Dear All, We would like to inform you about progress made on different topics like the Service Catalogue, the new Service Management Tool and the Service Desk. We would also like to present the plan for when we hope to "go live" and what this will mean for all of you running and providing services today. We will need your active support and help in the coming months to make this happen. GS⁢ Service Management Teams Reinoud Martens, Mats Moller

  18. Is your organization project management savvy?

    PubMed

    Wolff, Pam

    2003-01-01

    As corporations struggle to gain better control and use of organizational resources in a rapidly changing business environment, they're finding that project management is an efficacious discipline for supporting strategic initiatives and achieving business goals. Successful project management requires an understanding of the business drivers, the organizational structure, the benefits of centralizing project management, and the factors that could impact performance.

  19. 76 FR 56363 - Capital Project Management

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-13

    ... Federal Transit Administration 49 CFR Part 633 RIN 2132-AA92 Capital Project Management AGENCY: Federal...: This proposal would transform the current FTA rule for project management oversight into a discrete set... the necessary management capacity and capability of a sponsor of a major capital project; spell out...

  20. 78 FR 16460 - Capital Project Management

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-15

    ... Federal Transit Administration 49 CFR Part 633 RIN 2132-AA92 Capital Project Management AGENCY: Federal... revise the agency's project management oversight regulations, in light of the recent, fundamental changes... Progress in the 21st Century Act (``MAP-21''). FTA will reinitiate a rulemaking for project management...

  1. 76 FR 67400 - Capital Project Management

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-01

    ... TRANSPORTATION Federal Transit Administration 49 CFR Part 633 RIN 2132-AA92 Capital Project Management AGENCY... Capital Project Management to December 2, 2011, to allow interested parties time to carefully review the...) proposing to transform the current FTA rule for project management oversight into a discrete set of...

  2. Finance and supply management project execution plan

    SciTech Connect

    BENNION, S.I.

    1999-02-10

    As a subproject of the HANDI 2000 project, the Finance and Supply Management system is intended to serve FDH and Project Hanford major subcontractor with financial processes including general ledger, project costing, budgeting, and accounts payable, and supply management process including purchasing, inventory and contracts management. Currently these functions are performed with numerous legacy information systems and suboptimized processes.

  3. Practical Project Management for Education and Training.

    ERIC Educational Resources Information Center

    Lockitt, Bill

    This booklet provides a succinct guide to effective management procedures, including whether and how to take on projects, estimation of costs prior to project bids, project management tools, case studies, and practical exercises for staff development activities. Chapter 1 investigates why institutions take on projects, issues involved, benefits…

  4. Success Factors in Management of Large Projects

    NASA Astrophysics Data System (ADS)

    Kirk, Thomas B. W.

    2001-04-01

    Large Projects in science have now regularly reached the size where formal project management methods and tools are needed for successful execution of the work. Success factors in the management of such projects are identified and compared with actual performance in recent successful and unsuccessful projects.

  5. Environmental management of the stone cutting industry.

    PubMed

    Nasserdine, Khaled; Mimi, Ziad; Bevan, Blair; Elian, Belal

    2009-01-01

    Environmental Management of the stone cutting industry in Hebron is required to reduce the industry's adverse impact on the downstream agricultural land and the adverse impact on the drinking water aquifers. This situation requires the implementation of an industrial wastewater management strategic approach and technology, within the available technical and financial resources. Ten pilot projects at different locations were built at Hebron to reduce or eliminate the incompatible discharge of the liquid and solid waste to the environment and improve the stone cutting industry's effluent quality. A review of existing practices and jar test experiments were used to optimize the water recycling and treatment facilities. The factors reviewed included influent pumping rates and cycles, selection of the optimal coagulant type and addition methods, control of the sludge recycling process, control over flow rates, control locations of influent and effluent, and sludge depth. Based on the optimized doses and Turbidity results, it was determined that the use of Fokland polymer with an optimal dose of 1.5mg/L could achieve the target turbidity levels. The completion of the pilot projects resulted in the elimination of stone cutting waste discharges and an improvement in the recycled effluent quality of 44-99%. This in turn reduced the long term operating costs for each participating firm. A full-scale project that includes all the stone cutting firms in Hebron industrial area is required.

  6. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward J. (Editor)

    1994-01-01

    This volume is the eighth in an ongoing series addressing current topics and lessons learned in NASA program and project management. Articles in this volume cover the following topics: (1) power sources for the Galileo and Ulysses Missions; (2) managing requirements; (3) program control of the Tropical Rainfall Measuring Mission; (4) project management method; (5) career development for project managers; and (6) resources for NASA managers.

  7. A Project-Based Model for Professional Environmental Experience

    ERIC Educational Resources Information Center

    Meehan, Barry; Thomas, Ian

    2006-01-01

    The projects described in this article were designed to provide a real world situation akin to the work of environmental professionals. The projects were conducted with Australian students working on environmental issues in Vietnam. The projects demonstrated that multi-disciplinary teamwork fits well into environmental projects, and importantly…

  8. Legacy Risk Measure for Environmental Management Waste

    SciTech Connect

    Eide, Steven Arvid; Nitschke, Robert Leon

    2002-02-01

    The Idaho National Engineering and Environmental Laboratory (INEEL) is investigating the development of a comprehensive and quantitative risk model framework for environmental management activities at the site. Included are waste management programs (high-level waste, transuranic waste, low-level waste, mixed low-level waste, spent nuclear fuel, and special nuclear materials), major environmental restoration efforts, major decontamination and decommissioning projects, and planned long-term stewardship activities. Two basic types of risk estimates are included: risks from environmental management activities, and long-term legacy risks from wastes/materials. Both types of risks are estimated using the Environment, Safety, and Health Risk Assessment Program (ESHRAP) developed at the INEEL. Given these two types of risk calculations, the following evaluations can be performed: • Risk evaluation of an entire program (covering waste/material as it now exists through disposal or other end states) • Risk comparisons of alternative programs or activities • Comparisons of risk benefit versus risk cost for activities or entire programs • Ranking of programs or activities by risk • Ranking of wastes/materials by risk • Evaluation of site risk changes with time as activities progress • Integrated performance measurement using indicators such as injury/death and exposure rates. This paper discusses the definition and calculation of legacy risk measures and associated issues. The legacy risk measure is needed to support three of the seven types of evaluations listed above: comparisons of risk benefit versus risk cost, ranking of wastes/materials by risk, and evaluation of site risk changes with time.

  9. 78 FR 29132 - Environmental Management Resources, Inc.; Transfer of Data

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-17

    ... AGENCY Environmental Management Resources, Inc.; Transfer of Data AGENCY: Environmental Protection Agency... Management Resources, Inc. Environmental Management Resources, Inc. has been awarded a contract to perform work for OPP, and access to this information will enable Environmental Management Resources, Inc....

  10. Female Project Managers' Workplace Problems: a Survey

    NASA Astrophysics Data System (ADS)

    Duong, Thuong Thi; Skitmore, Martin

    This article examines the extent to which challenges in the workplace may cause female project managers to be in a significantly small minority. A survey of members of the Australian Institute of Project Management in Queensland is described. This compares the experiences and observations of both men and women on various issues related to technical and gender aspects in project management workplaces. The results show that although female project managers experience many problems, male project managers also experience most of the same problems. Likewise, there are also few differences between more and less experience, the level of management, and types of industries. The differences that do occur involve discrimination against women in general, differences in project management styles, and support from other project managers.

  11. Effect of Selected Modeling Assumptions on Subsurface Radionuclide Transport Projections for the Potential Environmental Management Disposal Facility at Oak Ridge, Tennessee

    SciTech Connect

    Painter, Scott L.

    2016-06-28

    The Department of Energy’s Office of Environmental Management recently revised a Remedial Investigation/ Feasibility Study (RI/FS) that included an analysis of subsurface radionuclide transport at a potential new Environmental Management Disposal Facility (EMDF) in East Bear Creek Valley near Oak Ridge, Tennessee. The effect of three simplifying assumptions used in the RI/FS analyses are investigated using the same subsurface pathway conceptualization but with more flexible modeling tools. Neglect of vadose zone dispersion was found to be conservative or non-conservative, depending on the retarded travel time and the half-life. For a given equilibrium distribution coefficient, a relatively narrow range of half-life was identified for which neglect of vadose zone transport is non-conservative and radionuclide discharge into surface water is non-negligible. However, there are two additional conservative simplifications in the reference case that compensate for the non-conservative effect of neglecting vadose zone dispersion: the use of a steady infiltration rate and vadose zone velocity, and the way equilibrium sorption is used to represent transport in the fractured material of the saturated aquifer. With more realistic representations of all three processes, the RI/FS reference case was found to either provide a reasonably good approximation to the peak concentration or was significantly conservative (pessimistic) for all parameter combinations considered.

  12. Project Canada West. Canadian Environmental Concepts.

    ERIC Educational Resources Information Center

    Western Curriculum Project on Canada Studies, Edmonton (Alberta).

    The overall objective of the curriculum development project is to develop a general high school level interdisciplinary course on environment studies. This potential five to ten month course is outlined as follows: ecology, water pollution, air pollution, noise pollution, population, socioeconomic implications, and resource management. The general…

  13. Project Management Plan for the INEL technology logic diagrams

    SciTech Connect

    Rudin, M.J.

    1992-10-01

    This Project Management Plan (PjMP) describes the elements of project planning and control that apply to activities outlined in Technical Task Plan (TTP) ID-121117, ``Technology Logic Diagrams For The INEL.`` The work on this project will be conducted by personnel in EG&G Idaho, Inc.`s Waste Technology Development Program. Technology logic diagrams represent a formal methodology to identify technology gaps or needs within Environmental Restoration/Waste Management Operations, which will focus on Office of Environmental Restoration and Waste Management (EM-50) research and development, demonstration, test, and evaluation efforts throughout the US Department of Energy complex. This PjMP describes the objectives, organization, roles and responsibilities, workscope and processes for implementing and managing the technology logic diagram for the Idaho National Engineering Laboratory project.

  14. Project Management Plan for the INEL technology logic diagrams

    SciTech Connect

    Rudin, M.J.

    1992-10-01

    This Project Management Plan (PjMP) describes the elements of project planning and control that apply to activities outlined in Technical Task Plan (TTP) ID-121117, Technology Logic Diagrams For The INEL.'' The work on this project will be conducted by personnel in EG G Idaho, Inc.'s Waste Technology Development Program. Technology logic diagrams represent a formal methodology to identify technology gaps or needs within Environmental Restoration/Waste Management Operations, which will focus on Office of Environmental Restoration and Waste Management (EM-50) research and development, demonstration, test, and evaluation efforts throughout the US Department of Energy complex. This PjMP describes the objectives, organization, roles and responsibilities, workscope and processes for implementing and managing the technology logic diagram for the Idaho National Engineering Laboratory project.

  15. Project Management Plan (PMP) for Work Management Implementation

    SciTech Connect

    SHIPLER, C.E.

    2000-01-13

    The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

  16. 40 CFR 262.103 - What is the scope of the laboratory environmental management standard?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 27 2012-07-01 2012-07-01 false What is the scope of the laboratory... University Laboratories XL Project-Laboratory Environmental Management Standard § 262.103 What is the scope of the laboratory environmental management standard? The Laboratory Environmental Management...

  17. Hanford environmental dose reconstruction project: Monthly report

    SciTech Connect

    Dennis, B.S.

    1989-02-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that populations could have received from nuclear operations at Hanford since 1944. The Technical Steering Panel consists of experts in environmental pathways, epidemiology, surface-water transport, ground-water transport, statistics, demography, agriculture, meteorology, nuclear engineering, radiation dosimetry, and cultural anthropology. Included among the members are appointed technical members representing the States of Oregon and Washington, cultural and technical experts nominated by the Indian tribes in the region, and an individual representing the public.

  18. Environmental Restoration Program Management Control Plan

    SciTech Connect

    Not Available

    1991-09-01

    This Management Control Plan has been prepared to define the Energy Systems approach to managing its participation in the US DOE's Environmental Restoration (ER) Program in a manner consistent with DOE/ORO 931: Management Plan for the DOE Field Office, Oak Ridge, Decontamination and Decommissioning Program; and the Energy Systems Environmental Restoration Contract Management Plan (CMP). This plan discusses the systems, procedures, methodology, and controls to be used by the program management team to attain these objectives.

  19. Japanese experiences of environmental management.

    PubMed

    Matsuo, T

    2003-01-01

    Japan experienced a very rapid industrialization and economic growth in the era of income doubling in 1960s and at the same time Japan experienced very severe damage from various types of environmental pollution. In this paper, historical development of population, GNP, energy consumption with classification of petroleum, coal and electric power, and CO2 emission are introduced as basic background data on Japanese development. The tragic experience of Minamata disease and Itai-itai disease caused by methyl mercury and cadmium, respectively, are introduced. In two tables, historical development of water pollution and air pollution are summarized. Regarding solid wastes management, the total mass balance in Japan and recent development in legislation framework for enhancement of recycling of wastes are introduced briefly.

  20. INEL Waste and Environmental Information Integration Project approach and concepts

    SciTech Connect

    Dean, L.A.; Fairbourn, P.J.; Randall, V.C.; Riedesel, A.M.

    1994-06-01

    The Idaho National Engineering, Laboratory (INEL) Waste and Environmental Information integration Project (IWEIIP) was established in December 1993 to address issues related to INEL waste and environmental information including: Data quality; Data redundancy; Data accessibility; Data integration. This effort includes existing information, new development, and acquisition activities. Existing information may not be a database record; it may be an entire document (electronic, scanned, or hard-copy), a video clip, or a file cabinet of information. The IWEIIP will implement an effective integrated information framework to manage INEL waste and environmental information as an asset. This will improve data quality, resolve data redundancy, and increase data accessibility; therefore, providing more effective utilization of the dollars spent on waste and environmental information.

  1. Antelope-Fossil Rebuild Project : Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-04-01

    The Columbia Power Cooperative Association (CPCA), Monument, Oregon, proposes to upgrade a 69-kV transmission line in Wasco and Wheeler Counties, Oregon, between the Antelope Substation and the Bonneville Power Administration`s (BPA) Fossil Substation. The project involves rebuilding and reconductoring 23.2 miles of transmission line, including modifying it for future use at 115 kV. Related project activities will include setting new wood pole structures, removing and disposing of old structures, conductors, and insulators, and stringing new conductor, all within the existing right-of-way. No new access roads will be required. A Borrower`s Environmental Report was prepared for the 1992--1993 Work Plan for Columbia Power Cooperative Association in March 1991. This report investigated cultural resources, threatened or endangered species, wetlands, and floodplains, and other environmental issues, and included correspondence with appropriate Federal, state, and local agencies. The report was submitted to the Rural Electrification Administration for their use in preparing their environmental documentation for the project.

  2. Antelope-Fossil Rebuild Project : Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-04-01

    The Columbia Power Cooperative Association (CPCA), Monument, Oregon, proposes to upgrade a 69-kV transmission line in Wasco and Wheeler Counties, Oregon, between the Antelope Substation and the Bonneville Power Administration's (BPA) Fossil Substation. The project involves rebuilding and reconductoring 23.2 miles of transmission line, including modifying it for future use at 115 kV. Related project activities will include setting new wood pole structures, removing and disposing of old structures, conductors, and insulators, and stringing new conductor, all within the existing right-of-way. No new access roads will be required. A Borrower's Environmental Report was prepared for the 1992--1993 Work Plan for Columbia Power Cooperative Association in March 1991. This report investigated cultural resources, threatened or endangered species, wetlands, and floodplains, and other environmental issues, and included correspondence with appropriate Federal, state, and local agencies. The report was submitted to the Rural Electrification Administration for their use in preparing their environmental documentation for the project.

  3. 41 CFR 102-80.75 - Who assesses environmental issues in Federal construction and lease construction projects?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... environmental issues in Federal construction and lease construction projects? 102-80.75 Section 102-80.75 Public... Management Assessment of Environmental Issues § 102-80.75 Who assesses environmental issues in Federal construction and lease construction projects? Federal agencies must assess required environmental...

  4. Indigenous Studies Speaks to Environmental Management

    NASA Astrophysics Data System (ADS)

    Richmond, Laurie; Middleton, Beth Rose; Gilmer, Robert; Grossman, Zoltán; Janis, Terry; Lucero, Stephanie; Morgan, Tukoroirangi; Watson, Annette

    2013-11-01

    This article describes the increasing connections between the fields of Indigenous studies and environmental management and examines some of the ways that an Indigenous studies perspective can guide thinking about environmental management. Indigenous groups have been involved in the management of environmental and natural resources on their lands since time immemorial. Indigenous groups have also become increasingly involved in Western practices of environmental management with the advent of co-management institutions, subsistence boards, traditional ecological knowledge forums, and environmental issues affecting Indigenous resources. Thus, it is an important time for scholarship that explores how Indigenous groups are both shaping and being affected by processes of environmental management. This article summarizes key findings and themes from eight papers situated at the intersection of these two fields of study and identify means by which environmental managers can better accommodate Indigenous rights and perspectives. It is the authors’ hope that increased dialog between Indigenous studies and environmental management can contribute to the building of sustainable and socially just environmental management practices.

  5. Project management practices in engineering university

    NASA Astrophysics Data System (ADS)

    Sirazitdinova, Y.; Dulzon, A.; Mueller, B.

    2015-10-01

    The article presents the analysis of usage of project management methodology in Tomsk Polytechnic University, in particular the experience with the course Project management which started 15 years ago. The article presents the discussion around advantages of project management methodology for engineering education and administration of the university in general and the problems impeding extensive implementation of this methodology in teaching, research and management in the university.

  6. Environmental Management Performance Report March 2000

    SciTech Connect

    EDER, D.M.

    2000-03-16

    The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-RL) a report of the Project Hanford Management Contractors' (PHMC) Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. This report is a monthly publication that summarizes the PHMC EM performance. In addition, it includes some PHMC-level data not detailed elsewhere in the report. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides a forward look to some of the upcoming key performance activities as extracted from the PHMC baseline. The remaining sections provide detailed performance data relative to each individual mission area (e.g., Waste Management, Spent Nuclear fuels , etc.), in support of Section A of the report. A glossary of terms is provided at the end of this report for reference purposes. Unless otherwise noted, the Safety, Conduct of Operations, and Cost/schedule data contained herein is as of January 31, 2000. All other information is as of March 1, 2000.

  7. Database Design for Preservation Project Management: The California Newspaper Project.

    ERIC Educational Resources Information Center

    Hayman, Lynne M.

    1997-01-01

    Describes a database designed to manage a serials preservation project in which issues from multiple repositories are gathered and collated for preservation microfilming. Management information, added to bibliographic and holdings records, supports the production of reports tracking preservation activity. (Author)

  8. OPTIMAL CONTROL THEORY FOR SUSTAINABLE ENVIRONMENTAL MANAGEMENT

    EPA Science Inventory

    With growing world population, diminishing resources, and realization of the harmful effects of various pollutants, research focus in environmental management has shifted towards sustainability. The goal of a sustainable management strategy is to promote the structure and operati...

  9. OPTIMAL CONTROL THEORY FOR SUSTAINABLE ENVIRONMENTAL MANAGEMENT

    EPA Science Inventory

    With growing world population, diminishing resources, and realization of the harmful effects of various pollutants, research focus in environmental management has shifted towards sustainability. The goal of a sustainable management strategy is to promote the structure and operati...

  10. 76 FR 55939 - Notice of Availability of the Draft Resource Management Plan and Associated Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-09

    ... Bureau of Land Management Notice of Availability of the Draft Resource Management Plan and Associated Environmental Impact Statement for the Lander Resource Management Plan Revision Project, Lander Field Office...: You may submit comments related to the Lander Resource Management Plan Revision Project by any of...

  11. 76 FR 13344 - Beaver Creek Landscape Management Project, Ashland Ranger District, Custer National Forest...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-11

    ... Forest Service Beaver Creek Landscape Management Project, Ashland Ranger District, Custer National Forest... Environmental Impact Statement for the Beaver Creek Landscape Management Project in the Federal Register (75 FR... Creek Landscape Management Project was published in the Federal Register on October 15, 2010 (75...

  12. The Dust Management Project: Final Report

    NASA Technical Reports Server (NTRS)

    Hyatt, Mark J.; Straka, Sharon

    2011-01-01

    A return to the Moon to extend human presence, pursue scientific activities, use the Moon to prepare for future human missions to Mars, and expand Earth s economic sphere, will require investment in developing new technologies and capabilities to achieve affordable and sustainable human exploration. From the operational experience gained and lessons learned during the Apollo missions, conducting longterm operations in the lunar environment will be a particular challenge, given the difficulties presented by the unique physical properties and other characteristics of lunar regolith, including dust. The Apollo missions and other lunar explorations have identified significant lunar dust-related problems that will challenge future mission success. Comprised of regolith particles ranging in size from tens of nanometers to microns, lunar dust is a manifestation of the complex interaction of the lunar soil with multiple mechanical, electrical, and gravitational effects. The environmental and anthropogenic factors effecting the perturbation, transport, and deposition of lunar dust must be studied in order to mitigate it s potentially harmful effects on exploration systems and human explorers. The Dust Management Project (DMP) is tasked with the evaluation of lunar dust effects, assessment of the resulting risks, and development of mitigation and management strategies and technologies related to Exploration Systems architectures. To this end, the DMP supports the overall goal of the Exploration Technology Development Program (ETDP) of addressing the relevant high priority technology needs of multiple elements within the Constellation Program (CxP) and sister ETDP projects. Project scope, approach, accomplishments, summary of deliverables, and lessons learned are presented.

  13. Hanford Environmental Management Program implementation plan

    SciTech Connect

    Not Available

    1988-08-01

    The Hanford Environmental Management Program (HEMP) was established to facilitate compliance with the applicable environmental statues, regulations, and standards on the Hanford Site. The HEMP provides a structured approach to achieve environmental management objectives. The Hanford Environmental Management Program Plan (HEMP Plan) was prepared as a strategic level planning document to describe the program management, technical implementation, verification, and communications activities that guide the HEMP. Four basic program objectives are identified in the HEMP Plan as follows: establish ongoing monitoring to ensure that Hanford Site operations comply with environmental requirements; attain regulatory compliance through the modification of activities; mitigate any environmental consequences; and minimize the environmental impacts of future operations at the Hanford Site. 2 refs., 24 figs., 27 tabs.

  14. IX Disposition Project - project management plan

    SciTech Connect

    Choi, I.G.

    1994-12-08

    This report presents plans for resolving saving and disposal concerns for ion exchange modules, cartridge filters and columns. This plan also documents the project baselines for schedules, cost, and technical information.

  15. West Valley Demonstration Project Annual Site Environmental Report Calendard Year 2005

    SciTech Connect

    West Valley Nuclear Services Company and URS Group, Inc.

    2006-09-21

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2005. The report summarizes calendar year (CY) 2005 environmental monitoring data so as to describe the performance of the WVDP's environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs.

  16. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2006

    SciTech Connect

    West Valley Nuclear Services Company and URS Group, Inc.

    2007-09-27

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2006. The report summarizes calendar year (CY) 2006 environmental monitoring data so as to describe the performance of the WVDP’s environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs that protect public health and safety and the environment.

  17. Graduate Student Project: Operations Management Product Plan

    ERIC Educational Resources Information Center

    Fish, Lynn

    2007-01-01

    An operations management product project is an effective instructional technique that fills a void in current operations management literature in product planning. More than 94.1% of 286 graduates favored the project as a learning tool, and results demonstrate the significant impact the project had in predicting student performance. The author…

  18. 43 CFR 418.29 - Project management.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Project management. 418.29 Section 418.29... INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Enforcement § 418.29 Project management. In addition to the provisions of § 418.28, if the District is found to...

  19. 43 CFR 418.29 - Project management.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Project management. 418.29 Section 418.29... INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Enforcement § 418.29 Project management. In addition to the provisions of § 418.28, if the District is found to...

  20. 43 CFR 418.29 - Project management.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Project management. 418.29 Section 418.29... INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Enforcement § 418.29 Project management. In addition to the provisions of § 418.28, if the District is found to...

  1. 43 CFR 418.29 - Project management.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Project management. 418.29 Section 418.29... INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Enforcement § 418.29 Project management. In addition to the provisions of § 418.28, if the District is found to...

  2. Graduate Student Project: Operations Management Product Plan

    ERIC Educational Resources Information Center

    Fish, Lynn

    2007-01-01

    An operations management product project is an effective instructional technique that fills a void in current operations management literature in product planning. More than 94.1% of 286 graduates favored the project as a learning tool, and results demonstrate the significant impact the project had in predicting student performance. The author…

  3. Basic Project Management Methodologies for Survey Researchers.

    ERIC Educational Resources Information Center

    Beach, Robert H.

    To be effective, project management requires a heavy dependence on the document, list, and computational capability of a computerized environment. Now that microcomputers are readily available, only the rediscovery of classic project management methodology is required for improved resource allocation in small research projects. This paper provides…

  4. Project management: importance for diagnostic laboratories.

    PubMed

    Croxatto, A; Greub, G

    2017-07-01

    The need for diagnostic laboratories to improve both quality and productivity alongside personnel shortages incite laboratory managers to constantly optimize laboratory workflows, organization, and technology. These continuous modifications of the laboratories should be conducted using efficient project and change management approaches to maximize the opportunities for successful completion of the project. This review aims at presenting a general overview of project management with an emphasis on selected critical aspects. Conventional project management tools and models, such as HERMES, described in the literature, associated personal experience, and educational courses on management have been used to illustrate this review. This review presents general guidelines of project management and highlights their importance for microbiology diagnostic laboratories. As an example, some critical aspects of project management will be illustrated with a project of automation, as experienced at the laboratories of bacteriology and hygiene of the University Hospital of Lausanne. It is important to define clearly beforehand the objective of a project, its perimeter, its costs, and its time frame including precise duration estimates of each step. Then, a project management plan including explanations and descriptions on how to manage, execute, and control the project is necessary to continuously monitor the progression of a project to achieve its defined goals. Moreover, a thorough risk analysis with contingency and mitigation measures should be performed at each phase of a project to minimize the impact of project failures. The increasing complexities of modern laboratories mean clinical microbiologists must use several management tools including project and change management to improve the outcome of major projects and activities. Copyright © 2017 The Author(s). Published by Elsevier Ltd.. All rights reserved.

  5. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1990-01-01

    This volume is the third in an ongoing series on aerospace project management at NASA. Articles in this volume cover the attitude of the program manager, program control and performance measurement, risk management, cost plus award fee contracting, lessons learned from the development of the Far Infrared Absolute Spectrometer (FIRAS), small projects management, and age distribution of NASA scientists and engineers. A section on resources for NASA managers rounds out the publication.

  6. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1991-01-01

    This volume is the third in an ongoing series on aerospace project management at NASA. Articles in this volume cover the attitude of the program manager, program control and performance measurement, risk management, cost plus award fee contracting, lessons learned from the development of the Far Infrared Absolute Spectrometer (FIRAS), small projects management, and age distribution of NASA scientists and engineers. A section on resources for NASA managers rounds out the publication.

  7. Environmental Assessment Expanded Ponnequin Wind Energy Project Weld County, Colorado

    SciTech Connect

    N /A

    1999-03-02

    The U.S.Department of Energy (DOE) has considered a proposal from the State of Colorado, Office of Energy Conservation (OEC), for funding construction of the Expanded Ponnequin Wind Project in Weld County, Colorado. OEC plans to enter into a contracting arrangement with Public Service Company of Colorado (PSCO) for the completion of these activities. PSCo, along with its subcontractors and business partners, are jointly developing the Expanded Ponnequin Wind Project. DOE completed an environmental assessment of the original proposed project in August 1997. Since then, the geographic scope and the design of the project changed, necessitating additional review of the project under the National Environmental Policy Act. The project now calls for the possible construction of up to 48 wind turbines on State and private lands. PSCo and its partners have initiated construction of the project on private land in Weld County, Colorado. A substation, access road and some wind turbines have been installed. However, to date, DOE has not provided any funding for these activities. DOE, through its Commercialization Ventures Program, has solicited applications for financial assistance from state energy offices, in a teaming arrangement with private-sector organizations, for projects that will accelerate the commercialization of emerging renewable energy technologies. The Commercialization Ventures Program was established by the Renewable Energy and Energy Efficiency Technology Competitiveness Act of 1989 (P.L. 101-218) as amended by the Energy Policy Act of 1992 (P.L. 102-486). The Program seeks to assist entry into the marketplace of newly emerging renewable energy technologies, or of innovative applications of existing technologies. In short, an emerging renewable energy technology is one which has already proven viable but which has had little or no operational experience. The Program is managed by the Department of Energy, Office of Energy Efficiency and Renewable Energy. The

  8. UMTRA Project environmental, health, and safety plan

    SciTech Connect

    Not Available

    1989-02-01

    The basic health and safety requirements established in this plan are designed to provide guidelines to be applied at all Uranium Mill Tailings Remedial Action (UMTRA) Project sites. Specific restrictions are given where necessary. However, an attempt has been made to provide guidelines which are generic in nature, and will allow for evaluation of site-specific conditions. Health and safety personnel are expected to exercise professional judgment when interpreting these guidelines to ensure the health and safety of project personnel and the general population. This UMTRA Project Environmental, Health, and Safety (EH S) Plan specifies the basic Federal health and safety standards and special DOE requirements applicable to this program. In addition, responsibilities in carrying out this plan are delineated. Some guidance on program requirements and radiation control and monitoring is also included. An Environmental, Health, and Safety Plan shall be developed as part of the remedial action plan for each mill site and associated disposal site. Special conditions at the site which may present potential health hazards will be described, and special areas that should should be addressed by the Remedial Action Contractor (RAC) will be indicated. Site-specific EH S concerns will be addressed by special contract conditions in RAC subcontracts. 2 tabs.

  9. Hellsgate Winter Range : Wildlife Mitigation Project. Final Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration.

    1995-03-01

    Bonneville Power Administration (BPA) proposes to fund the Hellsgate Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Colville Confederated Tribes and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities within the boundaries of the Colville Indian Reservation. This Final Environmental Assessment (EA) examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large project area. This area consists of several separated land parcels, of which 2,000 hectares (4,943 acres) have been purchased by BPA and an additional 4,640 hectares (11,466 acres) have been identified by the Colville Confederated Tribes for inclusion in the Project. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat that was adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs.

  10. Status of Project Management Education in Pakistan

    ERIC Educational Resources Information Center

    Arain, Faisal Manzoor; Tipu, Syed Awais Ahmad

    2009-01-01

    Emerging contractual delivery systems, collaborative partnerships, new management initiatives, and global product markets require professionals and students to have a broader awareness of construction methods and project management issues. This paper presents the state of the project management education in Pakistan. The analysis is based on…

  11. 43 CFR 418.29 - Project management.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Project management. 418.29 Section 418.29....29 Project management. In addition to the provisions of § 418.28, if the District is found to be... management of the diversion and outlet works (Derby Dam and Lahontan Dam/Reservoir) or any or all of the...

  12. Advancing Project Management in Learning Organizations

    ERIC Educational Resources Information Center

    Bourne, Lynda; Walker, Derek H. T.

    2004-01-01

    Effective project managers are required to have both "hard" technical skills to help control the iron triangle of time, cost and functional scope as well as relationship management skills to work effectively with people and get the best out of them. This paper argues that project managers also need a third skill: we refer to it as tapping into the…

  13. Status of Project Management Education in Pakistan

    ERIC Educational Resources Information Center

    Arain, Faisal Manzoor; Tipu, Syed Awais Ahmad

    2009-01-01

    Emerging contractual delivery systems, collaborative partnerships, new management initiatives, and global product markets require professionals and students to have a broader awareness of construction methods and project management issues. This paper presents the state of the project management education in Pakistan. The analysis is based on…

  14. Advancing Project Management in Learning Organizations

    ERIC Educational Resources Information Center

    Bourne, Lynda; Walker, Derek H. T.

    2004-01-01

    Effective project managers are required to have both "hard" technical skills to help control the iron triangle of time, cost and functional scope as well as relationship management skills to work effectively with people and get the best out of them. This paper argues that project managers also need a third skill: we refer to it as tapping into the…

  15. Technology-based management of environmental organizations using an Environmental Management Information System (EMIS): Design and development

    NASA Astrophysics Data System (ADS)

    Kouziokas, Georgios N.

    2016-01-01

    The adoption of Information and Communication Technologies (ICT) in environmental management has become a significant demand nowadays with the rapid growth of environmental information. This paper presents a prototype Environmental Management Information System (EMIS) that was developed to provide a systematic way of managing environmental data and human resources of an environmental organization. The system was designed using programming languages, a Database Management System (DBMS) and other technologies and programming tools and combines information from the relational database in order to achieve the principal goals of the environmental organization. The developed application can be used to store and elaborate information regarding: human resources data, environmental projects, observations, reports, data about the protected species, environmental measurements of pollutant factors or other kinds of analytical measurements and also the financial data of the organization. Furthermore, the system supports the visualization of spatial data structures by using geographic information systems (GIS) and web mapping technologies. This paper describes this prototype software application, its structure, its functions and how this system can be utilized to facilitate technology-based environmental management and decision-making process.

  16. Project Management in Real Time: A Service-Learning Project

    ERIC Educational Resources Information Center

    Larson, Erik; Drexler, John A., Jr.

    2010-01-01

    This article describes a service-learning assignment for a project management course. It is designed to facilitate hands-on student learning of both the technical and the interpersonal aspects of project management, and it involves student engagement with real customers and real stakeholders in the creation of real events with real outcomes. As…

  17. Project Management in Real Time: A Service-Learning Project

    ERIC Educational Resources Information Center

    Larson, Erik; Drexler, John A., Jr.

    2010-01-01

    This article describes a service-learning assignment for a project management course. It is designed to facilitate hands-on student learning of both the technical and the interpersonal aspects of project management, and it involves student engagement with real customers and real stakeholders in the creation of real events with real outcomes. As…

  18. Towards global environmental information and data management

    NASA Astrophysics Data System (ADS)

    Gurney, Robert; Allison, Lee; Cesar, Roberto; Cossu, Roberto; Dietz, Volkmar; Gemeinholzer, Birgit; Koike, Toshio; Mokrane, Mustapha; Peters, Dale; Thaller-Honold, Svetlana; Treloar, Andrew; Vilotte, Jean-Pierre; Waldmann, Christoph

    2014-05-01

    The Belmont Forum, a coalition of national science agencies from 13 countries, is supporting an 18-month effort to implement a 'Knowledge Hub' community-building and strategy development program as a first step to coordinate and streamline international efforts on community governance, interoperability and system architectures so that environmental data and information can be exchanged internationally and across subject domains easily and efficiently. This initiative represents a first step to build collaboratively an international capacity and e-infrastructure framework to address societally relevant global environmental change challenges. The project will deliver a community-owned strategy and implementation plan, which will prioritize international funding opportunities for Belmont Forum members to build pilots and exemplars in order to accelerate delivery of end-to end global change decision support systems. In 2012, the Belmont Forum held a series of public town hall meetings, and a two-day scoping meeting of scientists and program officers, which concluded that transformative approaches and innovative technologies are needed for heterogeneous data/information to be integrated and made interoperable for researchers in disparate fields and for myriad uses across international, institutional, disciplinary, spatial and temporal boundaries. Pooling Belmont Forum members' resources to bring communities together for further integration, cooperation, and leveraging of existing initiatives and resources has the potential to develop the e-infrastructure framework necessary to solve pressing environmental problems, and to support the aims of many international data sharing initiatives. The plan is expected to serve as the foundation of future Belmont Forum calls for proposals for e-Infrastructures and Data Management. The Belmont Forum is uniquely able to align resources of major national funders to support global environmental change research on specific technical and

  19. ENVIRONMENTAL SYSTEMS MANAGEMENT AND SUSTAINABLE SYSTEMS THEORY

    EPA Science Inventory

    Environmental Systems Management is the management of environmental problems at the systems level fully accounting for the multi-dimensional nature of the environment. This includes socio-economic dimensions as well as the usual physical and life science aspects. This is importa...

  20. ENVIRONMENTAL SYSTEMS MANAGEMENT AND SUSTAINABLE SYSTEMS THEORY

    EPA Science Inventory

    Environmental Systems Management is the management of environmental problems at the systems level fully accounting for the multi-dimensional nature of the environment. This includes socio-economic dimensions as well as the usual physical and life science aspects. This is importa...

  1. Environmental outcome-based management: Using environmental goals and measures in the Chesapeake Bay program

    SciTech Connect

    1999-07-01

    Attention is focused on the following: Establishing Environmental Outcome-Based Management; Chesapeake Bay Program Environmental Indicators; Managing for Environmental Results; Future Directions; and Appendices.

  2. Uneven Environmental Management: A Canadian Perspective

    NASA Astrophysics Data System (ADS)

    Reed, Maureen G.

    2007-01-01

    Advocates of community-based approaches to environmental management argue that by respecting local circumstances, skills, and concerns we may improve the prospects of achieving environmental sustainability; yet, within nation states such as Canada, environmental conditions, management and enforcement costs and capabilities, and power differentials within and among civic and public sectors may result in a highly differentiated capacity for environmental management across different localities and regions. This article draws on insights of political ecology to 1) create a conceptual framework that identifies key elements shaping regional environmental management regimes and to 2) undertake a comparative analysis to assess how elements interact to generate uneven management outcomes. I compare experiences of two Canadian biosphere reserves designated in 2000: Clayoquot Sound, BC; and Redberry Lake, SK. Analysis reveals that differences in governance and institutional capacities in the biosphere reserves are key to explaining uneven local outcomes. Where the public and civic sectors are strong, a robust and publicly vetted form of management will emerge. Where these sectors are weak and land is held as private property, environmental nongovernmental organizations can set the type and level of management, to the exclusion of effective civic and state involvement. This result may improve environmental sustainability but hinder social sustainability of a management regime and raises questions about the efficacy of community-based management.

  3. Basic concepts in environmental management

    SciTech Connect

    Mackenthun, K.M.

    1999-07-01

    This book covers regulations pertaining to air, land, and water resources. The fundamentals of environmental legislation, including US codes, public laws, and regulations are examined. Methods for conducting environmental assessments are presented. This book offers guidance on writing environmental impact statements. Attention is focused on issues related to toxic and hazardous materials and waste. Preventative safety measures are also included.

  4. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1992-01-01

    This volume is the fifth in an ongoing series on aerospace project management at NASA. Articles in this volume cover: an overview of the project cycle; SE&I management for manned space flight programs; shared experiences from NASA Programs and Projects - 1975; cost control for Mariner Venus/Mercury 1973; and the Space Shuttle - a balancing of design and politics. A section on resources for NASA managers rounds out the publication.

  5. Resource allocation for efficient environmental management.

    PubMed

    McCarthy, Michael A; Thompson, Colin J; Hauser, Cindy; Burgman, Mark A; Possingham, Hugh P; Moir, Melinda L; Tiensin, Thanawat; Gilbert, Marius

    2010-10-01

    Environmental managers must decide how to invest available resources. Researchers have previously determined how to allocate conservation resources among regions, design nature reserves, allocate funding to species conservation programs, design biodiversity surveys and monitoring programs, manage species and invest in greenhouse gas mitigation schemes. However, these issues have not been addressed with a unified theory. Furthermore, uncertainty is prevalent in environmental management, and needs to be considered to manage risks. We present a theory for optimal environmental management, synthesizing previous approaches to the topic and incorporating uncertainty. We show that the theory solves a diverse range of important problems of resource allocation, including distributing conservation resources among the world's biodiversity hotspots; surveillance to detect the highly pathogenic avian influenza H5N1 virus in Thailand; and choosing survey methods for the insect order Hemiptera. Environmental management decisions are similar to decisions about financial investments, with trade-offs between risk and reward.

  6. Environmental training research project. Final report

    SciTech Connect

    1996-04-01

    Santa Fe Community College serves an area including the city and county of Santa Fe. The population has a high percentage of Hispanics and a Native American population of about 3%. The student body at the college generally reflects that of the service district. The college strives to recruit students from all segments of the population so there is representation among all ethnic and economic groups. The college strives to serve students and the community by offering educational opportunities that meet the needs of both elements and which will lead to gainful employment. Instruction is also offered to meets needs for retraining, upgrades, and personal enlightenment. The college started a hazardous materials management program in the fall of 1991 which has since been renamed environmental management. The purpose of this program is to prepare students for environmental careers, to provide required training such as OSHA HAZWOPER and refresher courses, and to provide educational opportunities that would make the public more environmentally aware. The program content needs to be studied to ensure we`re meeting the needs of the students and the business community. There had not been a significant opportunity to conduct this research.

  7. Is environmental management an economically sustainable business?

    PubMed

    Gotschol, Antje; De Giovanni, Pietro; Esposito Vinzi, Vincenzo

    2014-11-01

    This paper investigates whether environmental management is an economically sustainable business. While firms invest in green production and green supply chain activities with the primary purpose of reducing their environmental impact, the reciprocal relationships with economic performance need to be clarified. Would firms and suppliers adjust their environmental strategies if the higher economic value that environmental management generates is reinvested in greening actions? We found out that environmental management positively influences economic performance as second order (long term) target, to be reached conditioned by higher environmental performance; in addition, firms can increase their performance if they reinvest the higher economic value gained through environmental management in green practices: While investing in environmental management programs is a short term strategy, economic rewards can be obtained only with some delays. Consequently, environmental management is an economically sustainable business only for patient firms. In the evaluation of these reciprocal relationships, we discovered that green supply chain initiatives are more effective and more economically sustainable than internal actions. Copyright © 2014 Elsevier Ltd. All rights reserved.

  8. Amine Swingbed Payload Project Management

    NASA Technical Reports Server (NTRS)

    Walsch, Mary; Curley, Su

    2013-01-01

    The International Space Station (ISS) has been designed as a laboratory for demonstrating technologies in a microgravity environment, benefitting exploration programs by reducing the overall risk of implementing such technologies in new spacecraft. At the beginning of fiscal year 2010, the ISS program manager requested that the amine-based, pressure-swing carbon dioxide and humidity absorption technology (designed by Hamilton Sundstrand, baselined for the Orion Multi-Purpose Crew Vehicle, and tested at the Johnson Space Center in relevant environments, including with humans, since 2005) be developed into a payload for ISS Utilization. In addition to evaluating the amine technology in a flight environment before the first launch of the Orion vehicle, the ISS program wanted to determine the capability of the amine technology to remove carbon dioxide from the ISS cabin environment at the metabolic rate of the full 6 ]person crew. Because the amine technology vents the absorbed carbon dioxide and water vapor to space vacuum (open loop), additional hardware needed to be developed to minimize the amount of air and water resources lost overboard. Additionally, the payload system would be launched on two separate Space Shuttle flights, with the heart of the payload-the swingbed unit itself-launching a full year before the remainder of the payload. This paper discusses the project management and challenges of developing the amine swingbed payload in order to accomplish the technology objectives of both the open -loop Orion application as well as the closed-loop ISS application.

  9. Amine Swingbed Payload Project Management

    NASA Technical Reports Server (NTRS)

    Hayley, Elizabeth; Curley, Su; Walsh, Mary

    2011-01-01

    The International Space Station (ISS) has been designed as a laboratory for demonstrating technologies in a microgravity environment, benefitting exploration programs by reducing the overall risk of implementing such technologies in new spacecraft. At the beginning of fiscal year 2010, the ISS program manager requested that the amine-based, pressure-swing carbon dioxide and humidity absorption technology (designed by Hamilton Sundstrand, baselined for the ORION Multi-Purpose Crew Vehicle, and tested at the Johnson Space Center in relevant environments, including with humans, since 2005) be developed into a payload for ISS Utilization. In addition to evaluating the amine technology in a flight environment before the first launch of the ORION vehicle, the ISS program wanted to determine the capability of the amine technology to remove carbon dioxide from the ISS cabin environment at the metabolic rate of the full 6-person crew. Because the amine technology vents the absorbed carbon dioxide and water vapor to space vacuum (open loop), additional hardware needed to be developed to minimize the amount of air and water resources lost overboard. Additionally, the payload system would be launched on two separate Space Shuttle flights, with the heart of the payload the swingbed unit itself launching a full year before the remainder of the payload. This paper discusses the project management and challenges of developing the amine swingbed payload in order to accomplish the technology objectives of both the open-loop ORION application as well as the closed-loop ISS application.

  10. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement. Volume 2, Part B

    SciTech Connect

    Not Available

    1994-06-01

    Two types of projects in the spent nuclear fuel and environmental restoration and waste management activities at the Idaho National Engineering Laboratory (INEL) are described. These are: foreseeable proposed projects where some funding for preliminary planning and/or conceptual design may already be authorized, but detailed design or planning will not begin until the Department of Energy (DOE) has determined that the requirements of the National Environmental Policy Act process for the project have been completed; planned or ongoing projects not yet completed but whose National Environmental Policy Act documentation is already completed or is expected to be completed before the Record of Decision for this Envirorunental Impact Statement (EIS) is issued. The section on project summaries describe the projects (both foreseeable proposed and ongoing).They provide specific information necessary to analyze the environmental impacts of these projects. Chapter 3 describes which alternative(s) each project supports. Summaries are included for (a) spent nuclear fuel projects, (b) environmental remediation projects, (c) the decontamination and decommissioning of surplus INEL facilities, (d) the construction, upgrade, or replacement of existing waste management facilities, (e) infrastructure projects supporting waste management activities, and (f) research and development projects supporting waste management activities.

  11. Toward an expert project management system

    NASA Technical Reports Server (NTRS)

    Silverman, Barry G.; Murray, Arthur; Diakite, Coty; Feggos, Kostas

    1987-01-01

    The purpose of the research effort is to prescribe a generic reusable shell that any project office can install and customize for the purposes of advising, guiding, and supporting project managers in that office. The prescribed shell is intended to provide both: a component that generates prescriptive guidance for project planning and monitoring activities, and an analogy (intuition) component that generates descriptive insights of previous experience of successful project managers. The latter component is especially significant in that it has the potential to: retrieve insights, not just data, and provide a vehicle for expert PMs to easily transcribe their current experiences in the course of each new project managed.

  12. Illinois drainage water management demonstration project

    USGS Publications Warehouse

    Pitts, D.J.; Cooke, R.; Terrio, P.J.; ,

    2004-01-01

    Due to naturally high water tables and flat topography, there are approximately 4 million ha (10 million ac) of farmland artificially drained with subsurface (tile) systems in Illinois. Subsurface drainage is practiced to insure trafficable field conditions for farm equipment and to reduce crop stress from excess water within the root zone. Although drainage is essential for economic crop production, there have been some significant environmental costs. Tile drainage systems tend to intercept nutrient (nitrate) rich soil-water and shunt it to surface water. Data from numerous monitoring studies have shown that a significant amount of the total nitrate load in Illinois is being delivered to surface water from tile drainage systems. In Illinois, these drainage systems are typically installed without control mechanisms and allow the soil to drain whenever the water table is above the elevation of the tile outlet. An assessment of water quality in the tile drained areas of Illinois showed that approximately 50 percent of the nitrate load was being delivered through the tile systems during the fallow period when there was no production need for drainage to occur. In 1998, a demonstration project to introduce drainage water management to producers in Illinois was initiated by NRCS4 An initial aspect of the project was to identify producers that were willing to manage their drainage system to create a raised water table during the fallow (November-March) period. Financial assistance from two federal programs was used to assist producers in retrofitting the existing drainage systems with control structures. Growers were also provided guidance on the management of the structures for both water quality and production benefits. Some of the retrofitted systems were monitored to determine the effect of the practice on water quality. This paper provides background on the water quality impacts of tile drainage in Illinois, the status of the demonstration project, preliminary

  13. Implementing MOE/MAR: balancing project management with change management.

    PubMed

    Saull-McCaig, Stephanie; Pacheco, RoseAnn; Kozak, Pakizah; Gauthier, Susan; Hahn, Rebecca

    2006-01-01

    When Toronto-based University Health Network initiated its Medication Order Entry/Medication Administration Record project in 2001, it was well understood by the organization that this would be one of the largest change management initiatives undertaken, and would require rigorous project management, significant clinical involvement and a well-developed change management program.

  14. Environmental issues in managing asthma.

    PubMed

    Diette, Gregory B; McCormack, Meredith C; Hansel, Nadia N; Breysse, Patrick N; Matsui, Elizabeth C

    2008-05-01

    Management of asthma requires attention to environmental exposures both indoors and outdoors. Americans spend most of their time indoors, where they have a greater ability to modify their environment. The indoor environment contains both pollutants (eg, particulate matter, nitrogen dioxide, secondhand smoke, and ozone) and allergens from furred pets, dust mites, cockroaches, rodents, and molds. Indoor particulate matter consists of particles generated from indoor sources such as cooking and cleaning activities, and particles that penetrate from the outdoors. Nitrogen dioxide sources include gas stoves, furnaces, and fireplaces. Indoor particulate matter and nitrogen dioxide are linked to asthma morbidity. The indoor ozone concentration is mainly influenced by the outdoor ozone concentration. The health effects of indoor ozone exposure have not been well studied. In contrast, there is substantial evidence of detrimental health effects from secondhand smoke. Guideline recommendations are not specific for optimizing indoor air quality. The 2007 National Asthma Education and Prevention Program asthma guidelines recommend eliminating indoor smoking and improving the ventilation. Though the guidelines state that there is insufficient evidence to recommend air cleaners, air cleaners and reducing activities that generate indoor pollutants may be sound practical approaches for improving the health of individuals with asthma. The guidelines are more specific about allergen avoidance; they recommend identifying allergens to which the individual is immunoglobin E sensitized and employing a multifaceted, comprehensive strategy to reduce exposure. Outdoor air pollutants that impact asthma include particulate matter, ozone, nitrogen dioxide, and sulfur dioxide, and guidelines recommend that individuals with asthma avoid exertion outdoors when these pollutants are elevated. Outdoor allergens include tree, grass, and weed pollens, which vary in concentration by season

  15. Environmental Issues in Managing Asthma

    PubMed Central

    Diette, Gregory B; McCormack, Meredith C; Hansel, Nadia N; Breysse, Patrick N; Matsui, Elizabeth C

    2008-01-01

    Management of asthma requires attention to environmental exposures both indoors and outdoors. Americans spend most of their time indoors, where they have a greater ability to modify their environment. The indoor environment contains both pollutants (eg, particulate matter, nitrogen dioxide, secondhand smoke, and ozone) and allergens from furred pets, dust mites, cockroaches, rodents, and molds. Indoor particulate matter consists of particles generated from indoor sources such as cooking and cleaning activities, and particles that penetrate from the outdoors. Nitrogen dioxide sources include gas stoves, furnaces, and fireplaces. Indoor particulate matter and nitrogen dioxide are linked to asthma morbidity. The indoor ozone concentration is mainly influenced by the outdoor ozone concentration. The health effects of indoor ozone exposure have not been well studied. In contrast, there is substantial evidence of detrimental health effects from secondhand smoke. Guideline recommendations are not specific for optimizing indoor air quality. The 2007 National Asthma Education and Prevention Program asthma guidelines recommend eliminating indoor smoking and improving the ventilation. Though the guidelines state that there is insufficient evidence to recommend air cleaners, air cleaners and reducing activities that generate indoor pollutants may be sound practical approaches for improving the health of individuals with asthma. The guidelines are more specific about allergen avoidance; they recommend identifying allergens to which the individual is immunoglobin E sensitized and employing a multifaceted, comprehensive strategy to reduce exposure. Outdoor air pollutants that impact asthma include particulate matter, ozone, nitrogen dioxide, and sulfur dioxide, and guidelines recommend that individuals with asthma avoid exertion outdoors when these pollutants are elevated. Outdoor allergens include tree, grass, and weed pollens, which vary in concentration by season

  16. How Does a Project Manager's Level of Development Influence Conceptualizations of Project Management and the Project Development Environment?

    ERIC Educational Resources Information Center

    Lynch, Margaret M.

    2013-01-01

    This study explores the meaning project managers (PMs) make of their project environment, how they lead their teams and have incorporate complexity into their project management approach. The exploration of the PM's developmental level and meaning making offers a different angle on the project management and leadership literature. The study…

  17. How Does a Project Manager's Level of Development Influence Conceptualizations of Project Management and the Project Development Environment?

    ERIC Educational Resources Information Center

    Lynch, Margaret M.

    2013-01-01

    This study explores the meaning project managers (PMs) make of their project environment, how they lead their teams and have incorporate complexity into their project management approach. The exploration of the PM's developmental level and meaning making offers a different angle on the project management and leadership literature. The study…

  18. Systems approach to project risk management

    SciTech Connect

    Kindinger, J. P.

    2002-01-01

    This paper describes the need for better performance in the planning and execution of projects and examines the capabilities of two different project risk analysis methods for improving project performance. A quantitative approach based on concepts and tools adopted from the disciplines of systems analysis, probabilistic risk analysis, and other fields is advocated for managing risk in large and complex research & development projects. This paper also provides an overview of how this system analysis approach for project risk management is being used at Los Alamos National Laboratory along with examples of quantitative risk analysis results and their application to improve project performance.

  19. Project Manager Performance and the Decision to Backsource the Project Management Office

    ERIC Educational Resources Information Center

    Lively, William R.

    2014-01-01

    This paper reviews a management decision of an Information Technology Outsource (ITO) provider to backshore the management oversight of its Project Management Office (PMO) after only one year of offshore operations. Governance is a term used in project management to refer to management oversight. The review is a quantitative analysis of existing…

  20. Project Manager Performance and the Decision to Backsource the Project Management Office

    ERIC Educational Resources Information Center

    Lively, William R.

    2014-01-01

    This paper reviews a management decision of an Information Technology Outsource (ITO) provider to backshore the management oversight of its Project Management Office (PMO) after only one year of offshore operations. Governance is a term used in project management to refer to management oversight. The review is a quantitative analysis of existing…

  1. Environmental Management 1995: Progress and plans of the Environmental Management Program

    SciTech Connect

    1995-02-01

    Environmental Management 1995 is the second report prepared in response to the requirements of the National Defense Authorization Act for Fiscal Year l994. The first report, Environmental Management 1994, was published in February 1994. This report is intended to provide a broad overview of the Environmental Management program`s activities in 1994, 1995, and 1996. The first section of this report describes the Department of Energy`s Environmental Management program. This is followed by a closer look at what the program is doing across the country, organized by region to help the reader identify and locate sites of interest. Within each region, details of the largest sites are followed by site summaries reported by State and a summary of activities under the Formerly Utilized Sites Remedial Action Program (FUSRAP) and Uranium Mill Tailings Remedial Action Project (UMTRA). For the purposes of this report, a ``site`` is a Department of Energy installation; a ``facility`` is a building located on a Department of Energy site; and an ``area`` is a geographical area, operable unit, or waste area group of unspecified dimension within a site. Throughout this report, ``year`` refers to the Federal Government`s Fiscal Year, which begins on October 1. For example, Fiscal Year 1995 began on October 1, 1994 and will end on September 30, 1995. Budget totals for Hanford include the Hanford Site and Richland Operations Office. The Idaho National Engineering Laboratory includes the Idaho Chemical Processing Plant and the Idaho Operations Office. The Oak Ridge Reservation budget includes Oak Ridge National Laboratory, the Y-12 Plant, the K-25 Site, Oak Ridge Associated Laboratories, the Oak Ridge Operations Office, and funding for the FUSRAP program.

  2. Environmental assessment of the Environmental Restoration Project at Sandia National Laboratories/New Mexico

    SciTech Connect

    1996-03-01

    Sandia National Laboratories/New Mexico (SNL/NM) is managed and operated for the U.S. Department of Energy (DOE) by Sandia Corporation, a subsidiary of the Lockheed Martin Company. SNL/NM is located on land controlled by DOE within the boundaries of Kirtland Air Force Base (KAFB) in Albuquerque, New Mexico. The major responsibilities of SNL/NM are the support of national security and energy projects. This report provides an environmental assessment of proposed remedial action activities at the solid waste management units at SNL/NM. A risk assessment of health hazards is also discussed.

  3. Final rapid reactivation project environmental assessment

    SciTech Connect

    1999-02-10

    The US Department of Energy (DOE) has prepared an environmental assessment (EA) for the Rapid Reactivation Project at Sandia National Laboratories, New Mexico. The EA analyzes the potential effects of a proposal to increase production of neutron generators from the current capability of 600 units per year up to 2,000 units per year. The project would use existing buildings and infrastructure to the maximum extent possible to meet the additional production needs. The increased production levels would necessitate modifications and additions involving a total area of approximately 26,290 gross square feet at Sandia National Laboratories, New Mexico, Technical Area 1. Additional production equipment would be procured and installed. The no-action alternative would be to continue production activities at the current capability of 600 units per year. The EA analyzes effects on health, safety, and air quality, resulting from construction and operation and associated cumulative effects. A detailed description of the proposed action and its environmental consequences is presented in the EA.

  4. Deriving Management Information from Environmental Notices of Violation

    DTIC Science & Technology

    1992-10-01

    USATHAMA has developed only a limited data base (really more of a receipt log) for NOVs. Although the Army does have an automated system to identify...management information value. The 12 items not so annotated are those to which we refer in the text as the "substantive’ data elements. distinguish...may be made by upgrading the Army Automated Environmental Management Information System framework to make the link between the project data base

  5. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1988-01-01

    This collection of papers and resources on aerospace management issues is inspired by a desire to benefit from the lessons learned from past projects and programs. Inherent in the NASA culture is a respect for divergent viewpoints and innovative ways of doing things. This publication presents a wide variety of views and opinions. Good management is enhanced when program and project managers examine the methods of veteran managers, considering the lessons they have learned and reflected on their own guiding principles.

  6. Spent Nuclear Fuel Project dose management plan

    SciTech Connect

    Bergsman, K.H.

    1996-03-01

    This dose management plan facilitates meeting the dose management and ALARA requirements applicable to the design activities of the Spent Nuclear Fuel Project, and establishes consistency of information used by multiple subprojects in ALARA evaluations. The method for meeting the ALARA requirements applicable to facility designs involves two components. The first is each Spent Nuclear Fuel Project subproject incorporating ALARA principles, ALARA design optimizations, and ALARA design reviews throughout the design of facilities and equipment. The second component is the Spent Nuclear Fuel Project management providing overall dose management guidance to the subprojects and oversight of the subproject dose management efforts.

  7. Hanford Environmental Management Program plan; Revision 1

    SciTech Connect

    DeFigh-Price, C.

    1990-08-01

    The Hanford Environmental Management Program (HEMP) was established in November 1986 by the US Department of Energy-Richland Operations Office. Westinghouse Hanford Company has been assigned responsibility to manage this program. The program`s goal is to integrate environmental activities such as regulatory reporting and planning and to facilitate compliance with environmental regulations. Key activities include preparing and/or coordinating waste management and environmental restoration site-wide planning documents, maintaining the Waste Inventory Data System, coordinating site-wide regulatory reporting (SARA Title III, Dangerous Waste Report, etc.), Tri-Party Agreement Administration and Base (nonprogram specific) regulatory permitting and National Environmental Policy Act activities. Fiscal year (FY) 1991 is the first year this activity will be directly funded. This document describes accomplishments in FY 1990, the scope of work funded by this program for FY 1991, the prioritized tasks covered, and the management structure in place. 16 refs., 4 figs., 1 tab.

  8. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1989-01-01

    This new collection of papers on aerospace management issues contains a history of NASA program and project management, some lessons learned in the areas of management and budget from the Space Shuttle Program, an analysis of tools needed to keep large multilayer programs organized and on track, and an update of resources for NASA managers. A wide variety of opinions and techniques are presented.

  9. Blue Creek Winter Range : Wildlife Mitigation Project : Final Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration; United States. Bureau of Indian Affairs; Spokane Tribe of the Spokane Reservation, Washington

    1994-11-01

    Bonneville Power Administration (BPA) proposes to fund that portion of the Washington Wildlife Agreement pertaining to the Blue Creek Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Spokane Tribe, Upper Columbia United Tribes, and the Bureau of Indian Affairs (BIA). If fully implemented, the proposed action would allow the sponsors to protect and enhance 2,631 habitat units of big game winter range and riparian shrub habitat on 2,185 hectares (5,400 acres) of Spokane Tribal trust lands, and to conduct long term wildlife management activities within the Spokane Indian Reservation project area. This Final Environmental Assessment (EA) examines the potential environmental effects of securing land and conducting wildlife habitat enhancement and long term management activities within the boundaries of the Spokane Indian Reservation. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat adversely affected by the construction of Grand Coulee Dam and its reservoir.

  10. Adapting Project Management Practices to Research-Based Projects

    NASA Technical Reports Server (NTRS)

    Bahr, P.; Baker, T.; Corbin, B.; Keith, L.; Loerch, L.; Mullenax, C.; Myers, R.; Rhodes, B.; Skytland, N.

    2007-01-01

    From dealing with the inherent uncertainties in outcomes of scientific research to the lack of applicability of current NASA Procedural Requirements guidance documentation, research-based projects present challenges that require unique application of classical project management techniques. If additionally challenged by the creation of a new program transitioning from basic to applied research in a technical environment often unfamiliar with the cost and schedule constraints addressed by project management practices, such projects can find themselves struggling throughout their life cycles. Finally, supplying deliverables to a prime vehicle customer, also in the formative stage, adds further complexity to the development and management of research-based projects. The Biomedical Research and Countermeasures Projects Branch at NASA Johnson Space Center encompasses several diverse applied research-based or research-enabling projects within the newly-formed Human Research Program. This presentation will provide a brief overview of the organizational structure and environment in which these projects operate and how the projects coordinate to address and manage technical requirements. We will identify several of the challenges (cost, technical, schedule, and personnel) encountered by projects across the Branch, present case reports of actions taken and techniques implemented to deal with these challenges, and then close the session with an open forum discussion of remaining challenges and potential mitigations.

  11. Adapting Project Management Practices to Research-Based Projects

    NASA Technical Reports Server (NTRS)

    Bahr, P.; Baker, T.; Corbin, B.; Keith, L.; Loerch, L.; Mullenax, C.; Myers, R.; Rhodes, B.; Skytland, N.

    2007-01-01

    From dealing with the inherent uncertainties in outcomes of scientific research to the lack of applicability of current NASA Procedural Requirements guidance documentation, research-based projects present challenges that require unique application of classical project management techniques. If additionally challenged by the creation of a new program transitioning from basic to applied research in a technical environment often unfamiliar with the cost and schedule constraints addressed by project management practices, such projects can find themselves struggling throughout their life cycles. Finally, supplying deliverables to a prime vehicle customer, also in the formative stage, adds further complexity to the development and management of research-based projects. The Biomedical Research and Countermeasures Projects Branch at NASA Johnson Space Center encompasses several diverse applied research-based or research-enabling projects within the newly-formed Human Research Program. This presentation will provide a brief overview of the organizational structure and environment in which these projects operate and how the projects coordinate to address and manage technical requirements. We will identify several of the challenges (cost, technical, schedule, and personnel) encountered by projects across the Branch, present case reports of actions taken and techniques implemented to deal with these challenges, and then close the session with an open forum discussion of remaining challenges and potential mitigations.

  12. Willow Creek Wildlife Mitigation Project. Final Environmental Assessment.

    SciTech Connect

    1995-04-01

    Today`s notice announces BPA`s proposal to fund land acquisition or acquisition of a conservation easement and a wildlife management plan to protect and enhance wildlife habitat at the Willow Creek Natural Area in Eugene, Oregon. This action would provide partial mitigation for wildlife and wildlife habitat lost by the development of Federal hydroelectric projects in the Willamette River Basin. The project is consistent with BPA`s obligations under provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 as outlined by the Northwest Power Planning Council`s 1994 Columbia River Basin Fish and Wildlife Program. BPA has prepared an environmental assessment (DOE/EA-1023) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement (EIS) is not required and BPA is issuing this FONSI.

  13. A Theory of Software Project Management and PROMOL: A Project Management Modeling Language

    DTIC Science & Technology

    2008-03-01

    drivers that lead to functional and dysfunctional project behavior. We identify a set of criteria for assessing current and future modeling tools...project management theory that helps us to understand the conditions and drivers that lead to functional and dysfunctional project behavior. We identify...Turner explained the domain, the nature of project management, its governance and the functions of project management [27,28,29]. One year later

  14. Craig-Bonanza 345-kV Transmission Line Project: Environmental assessment

    SciTech Connect

    Not Available

    1988-01-01

    The Department of Energy (DOE), and the Western Area Power Administration (Western) proposes to construct and maintain a 345- kilovolt (kV) transmission line between Craig, Colorado, and Bonanza in eastern Utah. The project began in 1986 and construction is scheduled to be completed in 1989. The project, known as the Craig-Bonanza 345-kV Transmission Line Project (Project), will be located in Moffat and Rio Blanco counties in Colorado and Uintah County in Utah. Western has the lead role for project development and management, including environmental studies and construction. Cooperating federal agencies include the Bureau of Land Management (BLM), Rural Electrification Administration, US Fish and Wildlife Service, and Bureau of Indian Affairs. This environmental assessment was prepared in compliance with the National Environmental Policy Act (NEPA) and the regulations of the Council on Environmental Quality (CEQ), the DOE and the BLM. 360 refs., 33 figs., 21 tabs.

  15. [Nuclear energy and environment: review of the IAEA environmental projects].

    PubMed

    Fesenko, S; Fogt, G

    2012-01-01

    The review of the environmental projects of the International Atomic Energy Agency is presented. Basic IAEA documents intended to protect humans and the Environment are considered and their main features are discussed. Some challenging issues in the area of protection of the Environment and man, including the impact of nuclear facilities on the environment, radioactive waste management, and remediation of the areas affected by radiological accidents, nuclear testing and sites of nuclear facilities are also discussed. The need to maintain the existing knowledge in radioecology and protection of the environment is emphasised.

  16. The Impact of Project Management Maturity upon IT/IS Project Management Outcomes

    ERIC Educational Resources Information Center

    Carcillo, Anthony Joseph, Jr.

    2013-01-01

    Although it is assumed that increasing the institutionalization (or maturity) of project management in an organization leads to greater project success, the literature has diverse views. The purpose of this mixed methods study was to examine the correlation between project management maturity and IT/IS project outcomes. The sample consisted of two…

  17. The Impact of Project Management Maturity upon IT/IS Project Management Outcomes

    ERIC Educational Resources Information Center

    Carcillo, Anthony Joseph, Jr.

    2013-01-01

    Although it is assumed that increasing the institutionalization (or maturity) of project management in an organization leads to greater project success, the literature has diverse views. The purpose of this mixed methods study was to examine the correlation between project management maturity and IT/IS project outcomes. The sample consisted of two…

  18. Department of Energy Project Management System

    SciTech Connect

    Not Available

    1981-01-08

    This manual provides guidance to all appropriate personnel for implementation of DOE Project Management Policy. It sets forth the principles and requirements that govern the development, approval, and execution of DOE's outlay programs as embodied within the Project Management System (PMS). Its primary goal is to assure application of sound management principles providing a disciplined, systematic, and coordinated approach resulting in efficient planning, organization, coordination, budgeting, management, review, and control of DOE projects. The provisions of this manual are mandatory for the Department's Major Systems Acquisitions (MSA's) and Major Projects and will be used for other projects to the extent practicable. Department's project-management task is over 250 projects, with a total estimated cost in excess of $24 billion at completion. This diverse array of project activities requires a broad spectrum of scientific, engineering, and management skills to assure that they meet planned technical and other objectives and are accomplished on schedule, within cost and scope, and that they serve the purposes intended. In recognition of these requirements and the Department's ever-increasing magnitude of responsibilities, an interim Project Management System was established and has been in use for over a year. This manual constitutes an update of the system based on the experience gained and lessons learned during this initial period.

  19. Environmental Audit of the Grand Junction Projects Office

    SciTech Connect

    Not Available

    1991-08-01

    The Grand Junction Projects Office (GJPO) is located in Mesa County, Colorado, immediately south and west of the Grand Junction city limits. The US Atomic Energy Commission (AEC) established the Colorado Raw Materials Office at the present-day Grand Junction Projects Office in 1947, to aid in the development of a viable domestic uranium industry. Activities at the site included sampling uranium concentrate; pilot-plant milling research, including testing and processing of uranium ores; and operation of a uranium mill pilot plant from 1954 to 1958. The last shipment of uranium concentrate was sent from GJPO in January, 1975. Since that time the site has been utilized to support various DOE programs, such as the former National Uranium Resource Evaluation (NURE) Program, the Uranium Mill Tailings Remedial Action Project (UMTRAP), the Surplus Facilities Management Program (SFMP), and the Technical Measurements Center (TMC). All known contamination at GJPO is believed to be the result of the past uranium milling, analyses, and storage activities. Hazards associated with the wastes impounded at GJPO include surface and ground-water contamination and potential radon and gamma-radiation exposure. This report documents the results of the Baseline Environmental Audit conducted at Grand Junction Projects Office (GJPO) located in Grand Junction, Colorado. The Grand Junction Baseline Environmental Audit was conducted from May 28 to June 12, 1991, by the Office of Environmental Audit (EH-24). This Audit evaluated environmental programs and activities at GJPO, as well as GJPO activities at the State-Owned Temporary Repository. 4 figs., 12 tabs.

  20. Management Systems in Teacher Corps Projects.

    ERIC Educational Resources Information Center

    Henderson, Robert C., Ed.

    This book represents the culmination of a twelve-month management training and development program conducted by the New England Teacher Corps Network for its project directors and staff. Wesley Brown and Perry Zirkel trace the organizational evolution of Teacher Corps projects. William Smith presents a theoretical analysis of the management system…

  1. Spent Nuclear Fuel Project Configuration Management Plan

    SciTech Connect

    Reilly, M.A.

    1995-06-09

    This document is a rewrite of the draft ``C`` that was agreed to ``in principle`` by SNF Project level 2 managers on EDT 609835, dated March 1995 (not released). The implementation process philosphy was changed in keeping with the ongoing reengineering of the WHC Controlled Manuals to achieve configuration management within the SNF Project.

  2. Environmental management inventory of Galveston Bay. Final report

    SciTech Connect

    Hadden, S.G.

    1992-10-01

    The purpose of the report is to provide an inventory of those agencies and laws along with their associated regulations, that constitute the regulatory framework for environmental protection of Galveston Bay, one of the estuaries of national significance covered under the 1987 law. The inventory is largely descriptive, serving as the first phase in a larger project which will ultimately evaluate the effectiveness of the existing regulatory framework. That assessment in turn will form the basis for the Comprehensive Conservation and Management Plan as well as for policy recommendations to improve the coordination of environmental management of the Bay.

  3. Public Scholarship Student Projects for Introductory Environmental Courses

    ERIC Educational Resources Information Center

    Baum, Seth D.; Aman, Destiny D.; Israel, Andrei L.

    2012-01-01

    This paper presents a model project for introductory undergraduate courses that develops students as citizens contributing scholarship to public discussions of environmental issues. In this field-based project, students actively and independently engage with an environmental issue and present their project experience to a relevant public forum. In…

  4. Public Scholarship Student Projects for Introductory Environmental Courses

    ERIC Educational Resources Information Center

    Baum, Seth D.; Aman, Destiny D.; Israel, Andrei L.

    2012-01-01

    This paper presents a model project for introductory undergraduate courses that develops students as citizens contributing scholarship to public discussions of environmental issues. In this field-based project, students actively and independently engage with an environmental issue and present their project experience to a relevant public forum. In…

  5. Putting the Q into Quality Project Management

    ERIC Educational Resources Information Center

    Lockitt, Bill

    2007-01-01

    Project management covers a wide range of skills and is one of the best forms of staff development available for the development of skills by doing. This publication is for the use of staff involved in e-learning development projects. An introduction and overview includes discussion of e-learning projects in general and why they are undertaken;…

  6. Personal computers as a project management tool

    SciTech Connect

    Levers, W.H.

    1985-01-01

    This paper deals with project management experience related to application of business level personal computers to two design and construction projects. Projects include brine support facilities for two 50 MW geothermal power plants in the Imperial Valley of California adjacent to the Mexican border. The installed value of the facilities involved is approximately $40 million.

  7. Sound waste management plan. Restoration project 95115. Exxon Valdez oil spill restoration project final report

    SciTech Connect

    1996-02-01

    The project was designed to address marine pollution that is generated from landbased sources within the Prince William Sound communities of Cordova, Valdez, Whittier Tatitlek, and Chenega Bay. The project recommends ways to improve the management of three different waste streams generated within the communities and which are a chronic source of marine pollution: used oil, household hazardous waste, and solid waste. The recommendations, some of which have already been implemented, include: creation of a comprehensive used oil management system in each community, construction of Environmental Operation Stations to improve the overall management of solid and oily wastes, and the development of a regional household hazardous waste program.

  8. MANAGING UNCERTAINTY IN ENVIRONMENTAL DECISIONS

    EPA Science Inventory

    Many environmental decision makers and practitioners worldwide assume that the quality of data pertaining to a contaminated site is primarily determined by the nature of thhe analytical chemistry methods used to collect information. This assumption, which diminishes the importan...

  9. MANAGING UNCERTAINTY IN ENVIRONMENTAL DECISIONS

    EPA Science Inventory

    Many environmental decision makers and practitioners worldwide assume that the quality of data pertaining to a contaminated site is primarily determined by the nature of thhe analytical chemistry methods used to collect information. This assumption, which diminishes the importan...

  10. Oak Ridge National Laboratory Facilities Revitalization Project - Project Management Plan

    SciTech Connect

    Myrick, T.E.

    2000-06-06

    The Facilities Revitalization Project (FRP) has been established at Oak Ridge National Laboratory (ORNL) to provide new and/or refurbished research and support facilities for the Laboratory's science mission. The FRP vision is to provide ORNL staff with world-class facilities, consolidated at the X-10 site, with the first phase of construction to be completed within five years. The project will utilize a combination of U.S. Department of Energy (DOE), State of Tennessee, and private-sector funds to accomplish the new construction, with the facilities requirements to be focused on support of the ORNL Institutional Plan. This FRP Project Management Plan has been developed to provide the framework under which the project will be conducted. It is intended that the FRP will be managed as a programmatic office, with primary resources for execution of the project to be obtained from the responsible organizations within ORNL (Engineering, Procurement, Strategic Planning, etc.). The FRP Project Management Plan includes a definition of the project scope, the organizational responsibilities, and project approach, including detailed Work Breakdown Structure (WBS), followed by more detailed discussions of each of the main WBS elements: Project Planning Basis, Facility Deactivation and Consolidation, and New Facilities Development. Finally, a general discussion of the overall project schedule and cost tracking approach is provided.

  11. Environmental Science: 49 Science Fair Projects. Science Fair Projects Series.

    ERIC Educational Resources Information Center

    Bonnet, Robert L.; Keen, G. Daniel

    This book contains 49 science fair projects designed for 6th to 9th grade students. Projects are organized by the topics of soil, ecology (projects in habitat and life cycles), pests and controls (projects in weeds and insects), recycling (projects in resources and conservation), waste products (projects in decomposition), microscopic organisms,…

  12. Environmental Science: 49 Science Fair Projects. Science Fair Projects Series.

    ERIC Educational Resources Information Center

    Bonnet, Robert L.; Keen, G. Daniel

    This book contains 49 science fair projects designed for 6th to 9th grade students. Projects are organized by the topics of soil, ecology (projects in habitat and life cycles), pests and controls (projects in weeds and insects), recycling (projects in resources and conservation), waste products (projects in decomposition), microscopic organisms,…

  13. Global Project Management: Graduate Course

    DTIC Science & Technology

    2006-01-01

    business and if the project will have successful performance. In the final project presentation, the student should address what countries they may...the idiosyncrasies of different countries in an effort to plan a successful global project execution. Alternate schedule. This class may be used for...required? * Will religious factors influence the project? 24-Mar-06 ENCE ft 24 13 GP Characteristics * Multiple Time Zones * Exchange rates * Long

  14. Griffith Energy Project Final Environmental Impact Statement

    SciTech Connect

    N /A

    1999-04-02

    Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fuel, combined cycle power plant, on private lands south of Kingman, Ariz. The Project would be a ''merchant plant'' which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner, needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management. Public comments on the Draft EIS are addressed in the Final EIS, including addenda and modifications made as a result of the comments and/or new information.

  15. Environmentally Preferable Coatings for Structural Steel Project

    NASA Technical Reports Server (NTRS)

    Lewis, Pattie L. (Editor)

    2014-01-01

    The Ground Systems Development and Operations (GSDO) Program at NASA John F. Kennedy Space Center (KSC) has the primary objective of modernizing and transforming the launch and range complex at KSC to benefit current and future NASA programs along with other emerging users. Described a the "launch support and infrastructure modernization program" in the NASA Authorization Act of 2010, the GSDO Program will develop and implement shared infrastructure and process improvements to provide more flexible, affordable, and responsive capabilities to a multi-user community. In support of the GSDO Program, the objective of this project is to determine the feasibility of environmentally friendly corrosion resistant coatings for launch facilities and ground support equipment. The focus of the project is corrosion resistance and survivability with the goal to reduce the amount of maintenance required to preserve the performance of launch facilities while reducing mission risk. Number of facilities/structures with metallic structural and non-structural components in a highly corrosive environment. Metals require periodic maintenance activity to guard against the insidious effects of corrosion and thus ensure that structures meet or exceed design or performance life. The standard practice for protecting metallic substrates in atmospheric environments is the application of corrosion protective coating system.

  16. Modeling external risks in project management.

    PubMed

    Palomo, Jesus; Rios Insua, David; Ruggeri, Fabrizio

    2007-08-01

    To ascertain the viability of a project, undertake resource allocation, take part in bidding processes, and other related decisions, modern project management requires forecasting techniques for cost, duration, and performance of a project, not only under normal circumstances, but also under external events that might abruptly change the status quo. We provide a Bayesian framework that provides a global forecast of a project's performance. We aim at predicting the probabilities and impacts of a set of potential scenarios caused by combinations of disruptive events, and using this information to deal with project management issues. To introduce the methodology, we focus on a project's cost, but the ideas equally apply to project duration or performance forecasting. We illustrate our approach with an example based on a real case study involving estimation of the uncertainty in project cost while bidding for a contract.

  17. An Environmental Management Qualification through Distance Education

    ERIC Educational Resources Information Center

    Pretorius, Rudi W.

    2004-01-01

    The department of geography and environmental studies of the University of South Africa recently played a pivotal role in implementing an inter- and multidisciplinary undergraduate programme in environmental management. This programme prepares students for entry-level occupations, and equips them with the knowledge, skills and values needed to…

  18. Automated transportation management system (ATMS) software project management plan (SPMP)

    SciTech Connect

    Weidert, R.S., Westinghouse Hanford

    1996-05-20

    The Automated Transportation Management System (ATMS) Software Project Management plan (SPMP) is the lead planning document governing the life cycle of the ATMS and its integration into the Transportation Information Network (TIN). This SPMP defines the project tasks, deliverables, and high level schedules involved in developing the client/server ATMS software.

  19. Environmental management systems: Plotting a profitable course

    SciTech Connect

    Coyne, K.

    1997-07-01

    A new top-down focus on proactive environmental management moves beyond compliance to consider the impact of environmental practices on a company`s profit picture. In short, its goal is to balance the four major factors of risk, cost, market forces and regulatory/environmental requirements. One hundred Fortune 500 companies have already established committees for the environment at the board level. Of 445 companies in a recent Price Waterhouse survey, 40% maintain boardroom oversight of environmental practices and 75% conduct environmental audits. In this move to integrate environmental and business issues, many companies are adopting systems-based environmental management. A systems approach sets priorities by considering the technical, environmental engineering, and scientific aspects of the company`s Environmental Health and Safety (EHS)concerns and the bottom-line business considerations. In this process, management focus shifts from a reactive, compliance-oriented model of operation to a proactive, forward-thinking mode that reaps a healthy return on the EHS investment.

  20. Environmental monitoring and cooperative resource management at the WIPP site

    SciTech Connect

    Not Available

    1992-12-31

    This poster session by the Environmental Monitoring Section of the US DOE Waste Isolation Pilot Plant is to demonstrate that the DOE is committed to sound environmental management. This WIPP poster session demonstrates radiological as well as nonradiological environmental monitoring activities conducted routinely at the WIPP. And how data collected prior to the WIPP being operational is used to establish a preoperational baseline for environmental studies in which the samples collected during the operational phase will be compared. Cooperative Resource Management is a relatively new concept for governments agencies. It allows two or more agencies the ability to jointly share in funding a program or project and yet both agencies can benefit from the outcome. These programs are usually a biological type study. The WIPP cooperative agreement between the US BLM, DOE and its contractors is to continue the ongoing documentation of the diversity of the Chihuahuan desert.

  1. Project management: break through or bust.

    PubMed

    Zimmer, B T

    1999-08-01

    Making a wrong choice can severely affect even the best-managed implementation (and project manager's careers). There is simply no margin for error, so getting it right the first time is not merely an option--it is a prerequisite for success. This article will first review why projects fail, then highlight the project management process used by McInnes Steel to specify, choose, and implement MRP II software that was "right" for them. Insights and experiences will also be shared to assist others in their project management activities. Project ultimate measurement is the successful integration of new technology into the culture of the organization. The first and most crucial step in any implementation is the specification and subsequent selection of the equipment or technology. It is important to make the right choice--one where the technology provides value-added services to the users to help them do their jobs better, now and into the future.

  2. Agile Project Management for e-Learning Developments

    ERIC Educational Resources Information Center

    Doherty, Iain

    2010-01-01

    We outline the project management tactics that we developed in praxis in order to manage elearning projects and show how our tactics were enhanced through implementing project management techniques from a formal project management methodology. Two key factors have contributed to our project management success. The first is maintaining a clear…

  3. Hanford Environmental Dose Reconstruction Project. Monthly Technical Report, November 1987

    SciTech Connect

    Haerer, H. A.

    1987-11-01

    This monthly report for November 1987 summarizes the technical progress and project status for the Hanford Environmental Dose Reconstruction Project being conducted at Pacific Northwest Laboratory (PNL) under the direction of a Technical Steering Panel (TSP).

  4. Susitna Hydroelectric Project: terrestrial environmental workshop and preliminary simulation model

    USGS Publications Warehouse

    Everitt, Robert R.; Sonntag, Nicholas C.; Auble, Gregory T.; Roelle, James E.; Gazey, William

    1982-01-01

    The technical feasibility, economic viability, and environmental impacts of a hydroelectric development project in the Susitna River Basin are being studied by Acres American, Inc. on behalf of the Alaska Power Authority. As part of these studies, Acres American recently contracted LGL Alaska Research Associates, Inc. to coordinate the terrestrial environmental studies being performed by the Alaska Department of Fish and Game and, as subcontractors to LGL, several University of Alaska research groups. LGL is responsible for further quantifying the potential impacts of the project on terrestrial wildlife and vegetation, and for developing a plan to mitigate adverse impacts on the terrestrial environment. The impact assessment and mitigation plan will be included as part of a license application to the Federal Energy Regulatory Commission (FERC) scheduled for the first quarter of 1983. The quantification of impacts, mitigation planning, and design of future research is being organized using a computer simulation modelling approach. Through a series of workshops attended by researchers, resource managers, and policy-makers, a computer model is being developed and refined for use in the quantification of impacts on terrestrial wildlife and vegetation, and for evaluating different mitigation measures such as habitat enhancement and the designation of replacement lands to be managed by wildlife habitat. This report describes the preliminary model developed at the first workshop held August 23 -27, 1982 in Anchorage.

  5. Yakima Fisheries Project : Final Environmental Impact Statement.

    SciTech Connect

    United States. Bonneville Power Administration; Washington . Dept. of Fish and Wildlife; Confederated Tribes and Bands of the Yakama Nation, Washington.

    1996-01-01

    BPA proposes to fund several fishery-related activities in the Yakima River Basin. These activities, known as the Yakima Fisheries Project (YFP), would be jointly managed by the State of Washington and the Yakima Indian Nation. The YFP is included in the Northwest Power Planning Council`s (Council`s) fish and wildlife program. The Council selected the Yakima River system for attention because fisheries resources are severely reduced from historical levels and because there is a significant potential for enhancement of these resources. BPA`s proposed action is to fund (1) information gathering on the implementation of supplementation techniques and on feasibility of reintroducing coho salmon in an environment where native populations have become extinct; (2) research activities based on continuous assessment, feedback and improvement of research design and activities ({open_quotes}adaptive management{close_quotes}); and (3) die construction, operation, and maintenance of facilities for supplementing populations of upper Yakima spring chinook salmon. Examined in addition to No Action are two alternatives for action: (1) supplementation of depressed natural populations of upper Yakima spring chinook and (2) that same supplementation plus a study to determine the feasibility of reestablishing naturally spawning population and a significant fall fishery for coho in the Yakima Basin. Alternative 2 is the preferred action. A central hatchery would be built for either alternative, as well as three sites with six raceways each for acclimation and release of spring chinook smolts. Major issues examined in the Revised Draft EIS include potential impacts of the project on genetic and ecological resources of existing fish populations, on water quality and quantity, on threatened and endangered species listed under the Endangered Species Act, and on the recreational fishery.

  6. Exposure Concepts for Environmental Management

    EPA Science Inventory

    Modern life depends upon the use of many chemicals, products, and practices to promote well being and economic growth. However, when these chemicals, products and practices present the potential for harm to humans and ecosystems, they are termed environmental stressors and, as s...

  7. Isoperms: An Environmental Management Tool.

    ERIC Educational Resources Information Center

    Sebera, Donald K.

    A quantitative tool, the isoperm method, is described; it quantifies the effect of environmental factors of temperature (T) and percent relative humidity (%RH) on the anticipated useful life expectancy of paper-based collections. The isoperm method provides answers to questions of the expected lifetime of the collection under various temperature…

  8. Exposure Concepts for Environmental Management

    EPA Science Inventory

    Modern life depends upon the use of many chemicals, products, and practices to promote well being and economic growth. However, when these chemicals, products and practices present the potential for harm to humans and ecosystems, they are termed environmental stressors and, as s...

  9. Environmental Management at Swedish Universities

    ERIC Educational Resources Information Center

    Arvidsson, Karin

    2004-01-01

    Since 1996, all Swedish public authorities, which includes most universities, have been made responsible for contributing to the sustainable development of the society. Swedish universities are thus required to submit annual environmental reports about their policies, structures and actions. This study provides a review of the activities that…

  10. Environmental Management at Swedish Universities

    ERIC Educational Resources Information Center

    Arvidsson, Karin

    2004-01-01

    Since 1996, all Swedish public authorities, which includes most universities, have been made responsible for contributing to the sustainable development of the society. Swedish universities are thus required to submit annual environmental reports about their policies, structures and actions. This study provides a review of the activities that…

  11. Isoperms: An Environmental Management Tool.

    ERIC Educational Resources Information Center

    Sebera, Donald K.

    A quantitative tool, the isoperm method, is described; it quantifies the effect of environmental factors of temperature (T) and percent relative humidity (%RH) on the anticipated useful life expectancy of paper-based collections. The isoperm method provides answers to questions of the expected lifetime of the collection under various temperature…

  12. Environmentally Sound Small-Scale Livestock Projects. Guidelines for Planning Series Number 5.

    ERIC Educational Resources Information Center

    Jacobs, Linda

    This document was developed in response to the need for simplified technical information for planning environmentally sound small-scale projects in third world countries. It is aimed specifically at those who are planning or managing small-scale livestock projects in less-developed areas of the tropics and sub-tropics. The guidelines included in…

  13. Environmentally Sound Small-Scale Livestock Projects. Guidelines for Planning Series Number 5.

    ERIC Educational Resources Information Center

    Jacobs, Linda

    This document was developed in response to the need for simplified technical information for planning environmentally sound small-scale projects in third world countries. It is aimed specifically at those who are planning or managing small-scale livestock projects in less-developed areas of the tropics and sub-tropics. The guidelines included in…

  14. Environmental Education: Compendium for Integrated Waste Management.

    ERIC Educational Resources Information Center

    California Integrated Waste Management Board, Sacramento.

    This compendium is a tool for bringing waste management education into classrooms. Curriculum materials gathered from across the country were reviewed by California's top environmental educators, both for correlation with the state's educational frameworks and for accuracy and completeness of waste management information. Materials that cover…

  15. Environmental implementation plan: Chapter 14, Environmental compliance tracking and data management. Revision

    SciTech Connect

    Story, C.H.

    1993-10-06

    Environmental projects, issues, and programs have become increasingly important to the Westinghouse Savannah River Company (WSRC) management and the Department of Energy (DOE). A compliance-tracking system has been developed to monitor environmental requirements and commitments because they have become increasingly complex and numerous. An Environmental Data Management (EDM) steering committee was formed in October 1987 to develop computer system solutions to environmental needs. The committee`s main objective is to coordinate, within SRS divisions, the separate efforts that have been or are being developed to meet regulatory requirements and specific programmatic goals. The Environmental and Graphical Information Systems (E&GIS) Program was recently developed to establish a more formal organizational structure and enhance the coordination of geographical information systems (GIS) and environmental data management (EDM) activities at SRS. The general strategy of the program is to establish a coordination focal point for GIS and EDM activities, to provide for the integration of the several environmental and graphical information systems which exist mostly in stand-alone arrangements, and to guide the development of data management and geographical information applications in order to achieve alignment with Site computing architecture and standards. The E&GIS Program will enhance the Site`s ability to respond to data requirements in support of new missions, changing directives, and increasing regulatory requirements.

  16. Hanford Environmental Dose Reconstruction Project monthly report, August 1992

    SciTech Connect

    McMakin, A.H.; Cannon, S.D.; Finch, S.M.

    1992-09-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demography; food consumption; and agriculture; and environmental pathway and dose estimates.

  17. Hanford Environmental Dose Reconstruction Project monthly report, August 1992

    SciTech Connect

    McMakin, A.H.; Cannon, S.D.; Finch, S.M.

    1992-01-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demography; food consumption; and agriculture; and environmental pathway and dose estimates.

  18. Hanford Environmental Dose Reconstruction Project. Monthly report, November 1991

    SciTech Connect

    Finch, S.M.; McMakin, A.H.

    1991-12-31

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): Source terms; environmental transport environmental monitoring data; demographics, agriculture, food habits; environmental pathways and dose estimates.

  19. Hanford Environmental Dose Reconstruction Project. Monthly report, January 1992

    SciTech Connect

    Finch, S.M.; McMakin, A.H.

    1992-05-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): Source Terms, Environmental Transport, Environmental Monitoring Data, Demography, Food Consumption, and Agriculture, and Environmental Pathways and Dose Estimates.

  20. Hanford Environmental Dose Reconstruction Project monthly report, February 1993

    SciTech Connect

    Cannon, S.D.; Finch, S.M.

    1993-01-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project Is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates): Source Terms; Environmental Transport; Environmental Monitoring Data; Demography, Food Consumption, and Agriculture; and Environmental Pathways and Dose Estimates.

  1. Hanford Environmental Dose Reconstruction Project monthly report, February 1993

    SciTech Connect

    Cannon, S.D.; Finch, S.M.

    1993-03-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project Is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates): Source Terms; Environmental Transport; Environmental Monitoring Data; Demography, Food Consumption, and Agriculture; and Environmental Pathways and Dose Estimates.

  2. Hanford Environmental Dose Reconstruction Project monthly report, May 1992

    SciTech Connect

    Finch, S.M.; McMakin, A.H.

    1992-01-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These task correspond to the path radionuclides followed, from release to impact on humans (dose estimates): Source terms, environmental transport, environmental monitoring data, demography, food consumption, and agriculture, and environmental pathways and dose estimates.

  3. Hanford Environmental Dose Reconstruction Project monthly report, May 1992

    SciTech Connect

    Finch, S.M.; McMakin, A.H.

    1992-08-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These task correspond to the path radionuclides followed, from release to impact on humans (dose estimates): Source terms, environmental transport, environmental monitoring data, demography, food consumption, and agriculture, and environmental pathways and dose estimates.

  4. Environmental Impact Report, November 15, 1972. Indian Valley Colleges Project.

    ERIC Educational Resources Information Center

    Berg, Ernest H.; Fleming, Dale A.

    A study of the environmental impact of the construction of a second community college on a site adjacent to the City of Novato in Marin County, California, is presented. The five sections of the report are as follows: I. Project Description and Purpose: A. The Proposal; B. Purpose of the Project; C. Need for the Project; D. History of the Project;…

  5. Environmental assessment of USAID housing projects in the Russian Federation

    SciTech Connect

    Loran, B.; Miller, C.

    1995-12-01

    Parsons was selected by the United States Agency for International Development (USAID) as the general contractor for construction management for the construction of 2,500 housing units within the Russian Federation. These housing units, to be occupied by Russian officers returning from the Baltic States, are under construction on 15 sites, selected from an initial list of 200, based on habitability, capability of successful final construction. Cost meeting USAID guidelines, and impacts on the environment. USAID fulfilled NEPA requirements by preparing, with assistance of Parsons Engineering Science, a Programmatic Environmental Assessment and 15 site specific Environmental Assessments for the project. The sites were scattered over the entire Russian Federation west of the Ural Mountains. The site offerors completed an environmental checklist covering a broad range of possible impacts. Significant environmental issues and concerns were further identified during scoping meetings held at the site locations. The most important issues discussed were: soil contamination; gaseous, liquid, and solid pollutants to which the site may be exposed; incompatible adjacent land uses; ready access to utilities and social services; and socioeconomic situation favorable to resettlement of Russian military officers. No major environmental issues or concerns were identified for the 15 selected sites. Certificates indicating the absence of chemical and radiological surface and subsurface contamination at the proposed sites were provided by the local environmental officers. Polynuclear aromatic hydrocarbons were found present at one of the sites considered in a preliminary selection, and later rejected due to the failure of contractual negotiations. The environmental assessments included mitigation and monitoring measures for construction and operation (occupancy) impacts.

  6. Environmental management strategy: four forces analysis.

    PubMed

    Doyle, Martin W; Von Windheim, Jesko

    2015-01-01

    We develop an analytical approach for more systematically analyzing environmental management problems in order to develop strategic plans. This approach can be deployed by agencies, non-profit organizations, corporations, or other organizations and institutions tasked with improving environmental quality. The analysis relies on assessing the underlying natural processes followed by articulation of the relevant societal forces causing environmental change: (1) science and technology, (2) governance, (3) markets and the economy, and (4) public behavior. The four forces analysis is then used to strategize which types of actions might be most effective at influencing environmental quality. Such strategy has been under-used and under-valued in environmental management outside of the corporate sector, and we suggest that this four forces analysis is a useful analytic to begin developing such strategy.

  7. Environmental Management Strategy: Four Forces Analysis

    NASA Astrophysics Data System (ADS)

    Doyle, Martin W.; Von Windheim, Jesko

    2015-01-01

    We develop an analytical approach for more systematically analyzing environmental management problems in order to develop strategic plans. This approach can be deployed by agencies, non-profit organizations, corporations, or other organizations and institutions tasked with improving environmental quality. The analysis relies on assessing the underlying natural processes followed by articulation of the relevant societal forces causing environmental change: (1) science and technology, (2) governance, (3) markets and the economy, and (4) public behavior. The four forces analysis is then used to strategize which types of actions might be most effective at influencing environmental quality. Such strategy has been under-used and under-valued in environmental management outside of the corporate sector, and we suggest that this four forces analysis is a useful analytic to begin developing such strategy.

  8. Implement an ISO 14001 environmental management system

    SciTech Connect

    Schiffman, R.I.; Delaney, B.T.; Fleming, S.; Hamilton, E.

    1997-11-01

    The ISO 14001 Environmental Management System (EMS) standard brings environmental concerns into the mainstream of business operations by providing a framework for balancing and integrating environmental and economic interests. ISO 14001 requires that an organization develop an environmental management program that describes all of its environmental objectives and targets and how each will be achieved. The program must include a specific plan that details the actions required to meet each objective and target, the person(s) responsible for meeting each objective, and a time scale for when each target will be attained. Objectives and targets can be prioritized within the program, but all objectives must be included. This article outlines the benefits of developing an EMS, explains the ISO 14001 EMS standard, and provides detailed step-by-step guidance on what to do to become ISO 14001 certified.

  9. Lower Yakima Valley Wetlands and Riparian Restoration Project. Final Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration

    1994-10-01

    Bonneville Power Administration (BPA) proposes to fund that portion of the Washington Wildlife Mitigation Agreement pertaining to the Lower Yakima Valley Wetlands and Riparian Restoration Project (Project) in a cooperative effort with the Yakama Indian Nation and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities for the Project within the boundaries of the Yakama Indian Reservation. This Environmental Assessment examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large 20, 340 hectare (50, 308 acre) project area. As individual properties are secured for the Project, three site-specific activities (habitat enhancement, operation and maintenance, and monitoring and evaluation) may be subject to further site-specific environmental review. All required Federal/Tribal coordination, permits and/or approvals would be obtained prior to ground disturbing activities.

  10. CNR LARA project, Italy: Airborne laboratory for environmental research

    NASA Technical Reports Server (NTRS)

    Bianchi, R.; Cavalli, R. M.; Fiumi, L.; Marino, C. M.; Pignatti, S.

    1995-01-01

    The increasing interest for the environmental problems and the study of the impact on the environment due to antropic activity produced an enhancement of remote sensing applications. The Italian National Research Council (CNR) established a new laboratory for airborne hyperspectral imaging, the LARA Project (Laboratorio Aero per Ricerche Ambientali - Airborne Laboratory for Environmental Research), equipping its airborne laboratory, a CASA-212, mainly with the Daedalus AA5000 MIVIS (Multispectral Infrared and Visible Imaging Spectrometer) instrument. MIVIS's channels, spectral bandwidths, and locations are chosen to meet the needs of scientific research for advanced applications of remote sensing data. MIVIS can make significant contributions to solving problems in many diverse areas such as geologic exploration, land use studies, mineralogy, agricultural crop studies, energy loss analysis, pollution assessment, volcanology, forest fire management and others. The broad spectral range and the many discrete narrow channels of MIVIS provide a fine quantization of spectral information that permits accurate definition of absorption features from a variety of materials, allowing the extraction of chemical and physical information of our environment. The availability of such a hyperspectral imager, that will operate mainly in the Mediterranean area, at the present represents a unique opportunity for those who are involved in environmental studies and land-management to collect systematically large-scale and high spectral-spatial resolution data of this part of the world. Nevertheless, MIVIS deployments will touch other parts of the world, where a major interest from the international scientific community is present.

  11. Uranium Mill Tailings Remedial Action Project 1993 Environmental Report

    SciTech Connect

    Not Available

    1994-10-01

    This annual report documents the Uranium Mill Tailing Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1993, surface remedial action was complete at 10 of the 24 designated UMTRA Project processing sites. In 1993 the UMTRA Project office revised the UMTRA Project Environmental Protection Implementation Plan, as required by the US DOE. Because the UMTRA Project sites are in different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  12. Nuclear Materials Stewardship Within the DOE Environmental Management Program

    SciTech Connect

    Bilyeu, J. D.; Kiess, T. E.; Gates, M. L.

    2002-02-26

    The Department of Energy (DOE) Environmental Management (EM) Program has made significant progress in planning disposition of its excess nuclear materials and has recently completed several noteworthy studies. Since establishment in 1997, the EM Nuclear Material Stewardship Program has developed disposition plans for excess nuclear materials to support facility deactivation. All nuclear materials have been removed from the Miamisburg Environmental Management Project (Mound), and disposition planning is nearing completion for the Fernald Environmental Management Project and the Rocky Flats Environmental Technology Site. Only a few issues remain for materials at the Hanford and Idaho sites. Recent trade studies include the Savannah River Site Canyons Nuclear Materials Identification Study, a Cesium/Strontium Management Alternatives Trade Study, a Liquid Technical Standards Trade Study, an Irradiated Beryllium Reflectors with Tritium study, a Special Performance Assessment Required Trade Study, a Neutron Source Trade Study, and development of discard criteria for uranium. A Small Sites Workshop was also held. Potential and planned future activities include updating the Plutonium-239 storage study, developing additional packaging standards, developing a Nuclear Material Disposition Handbook, determining how to recover or dispose of Pu-244 and U-233, and working with additional sites to define disposition plans for their nuclear materials.

  13. Engineering data management: Experience and projections

    NASA Technical Reports Server (NTRS)

    Jefferson, D. K.; Thomson, B.

    1978-01-01

    Experiences in developing a large engineering data management system are described. Problems which were encountered are presented and projected to future systems. Business applications involving similar types of data bases are described. A data base management system architecture proposed by the business community is described and its applicability to engineering data management is discussed. It is concluded that the most difficult problems faced in engineering and business data management can best be solved by cooperative efforts.

  14. Engineering data management: Experience and projections

    NASA Technical Reports Server (NTRS)

    Jefferson, D. K.; Thomson, B.

    1978-01-01

    Experiences in developing a large engineering data management system are described. Problems which were encountered are presented and projected to future systems. Business applications involving similar types of data bases are described. A data base management system architecture proposed by the business community is described and its applicability to engineering data management is discussed. It is concluded that the most difficult problems faced in engineering and business data management can best be solved by cooperative efforts.

  15. NOMINATION FOR THE PROJECT MANAGEMENT INSTITUTE (PMI) PROJECT OF THE YEAR AWARD INTEGRATED DISPOSAL FACILITY (IDF)

    SciTech Connect

    MCLELLAN, G.W.

    2007-02-07

    CH2M HILL Hanford Group, Inc. (CH2M HILL) is pleased to nominate the Integrated Disposal Facility (IDF) project for the Project Management Institute's consideration as 2007 Project of the Year, Built for the U.S, Department of Energy's (DOE) Office of River Protection (ORP) at the Hanford Site, the IDF is the site's first Resource Conservation and Recovery Act (RCRA)-compliant disposal facility. The IDF is important to DOE's waste management strategy for the site. Effective management of the IDF project contributed to the project's success. The project was carefully managed to meet three Tri-Party Agreement (TPA) milestones. The completed facility fully satisfied the needs and expectations of the client, regulators and stakeholders. Ultimately, the project, initially estimated to require 48 months and $33.9 million to build, was completed four months ahead of schedule and $11.1 million under budget. DOE directed construction of the IDF to provide additional capacity for disposing of low-level radioactive and mixed (i.e., radioactive and hazardous) solid waste. The facility needed to comply with federal and Washington State environmental laws and meet TPA milestones. The facility had to accommodate over one million cubic yards of the waste material, including immobilized low-activity waste packages from the Waste Treatment Plant (WTP), low-level and mixed low-level waste from WTP failed melters, and alternative immobilized low-activity waste forms, such as bulk-vitrified waste. CH2M HILL designed and constructed a disposal facility with a redundant system of containment barriers and a sophisticated leak-detection system. Built on a 168-area, the facility's construction met all regulatory requirements. The facility's containment system actually exceeds the state's environmental requirements for a hazardous waste landfill. Effective management of the IDF construction project required working through highly political and legal issues as well as challenges with

  16. A Technology Solution Strengthens Comprehensive Environmental Management

    DTIC Science & Technology

    2012-05-23

    further action NEPA Workflow – IMO Planner Prepare for Environmental Impact Review Board ( EIRB )  The IMO NEPA Planner plans for additional...information for EIRB  The NEPA Coordinator has determined that the project may have environmental effects  The Planner must provide any...additional information needed for the EIRB  Prepare the information needed by the EIRB , including a demarcation of the site area NEPA Workflow – NEPA

  17. Superfund record of decision (EPA Region 5): Feed Materials Production Center, (USDOE) operable unit 5, AKA Fernald Environmental Management Project, Fernald, Hamilton County, OH, January 31, 1996

    SciTech Connect

    1996-12-01

    This decision document presents the selected remedial action for Operable Unit 5 of the FEMP site in Hamilton and Butler Counties, Ohio. Operable Unit 5 consists of impacted environmental media including groundwater in the underlying Great Miami Aquifer, perched groundwater, surface water, soil, sediment, flora, and fauna.

  18. 77 FR 67662 - Notice of Availability of the Desert Harvest Solar Project Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-13

    ... Bureau of Land Management Notice of Availability of the Desert Harvest Solar Project Final Environmental Impact Statement, Riverside County, CA and the Proposed California Desert Conservation Area Plan... 1976, as amended, the Bureau of Land Management (BLM) has prepared a Proposed California...

  19. Evaluation of generation 3 treatment technology for swine waste - A North Carolina's clean water management trust fund project - Technical environmental performance report

    USDA-ARS?s Scientific Manuscript database

    This project evaluated and demonstrated the viability of a third generation manure treatment technology. The technology was developed as an alternative to the lagoon/spray field system typically used to treat the wastewater generated by swine farms in North Carolina. It separates solids and liquids ...

  20. Women's Environmental Literacy As Social Capital In Environmental Management For Environmental Security of Urban Area

    NASA Astrophysics Data System (ADS)

    Asteria, Donna; Herdiansyah, Herdis; Wayan Agus Apriana, I.

    2016-02-01

    This study is about experience of women's role in environmental management to raise environmental security and form of women's emancipation movement. Environmental concerns conducted by residents of urban women who become environmental activists based on environmental literacy. Because of that, women's experience in interacting with both physic and social environment have differences in managing the environment including managing household waste by applying the principles of the 3Rs (reduce, reuse, recycle) and their persuasive efforts on their communities. This is the key to achieving sustainable development by anticipating environmental problem and preserving the environment. This study is conducted qualitative research method and its type is descriptive-explanative. The result of this study is environmental literacy of women activist on pro-environment action in their community that has achieved spiritual environmental literacy. Environmental literacy may differ due to internal and external condition of each individual. Pro-environment activities conducted as a form of responsibility of environmental concern such as eco-management, educational, and economic action, by persuading residents to proactively and consistently continue to do environmental management and develop a sense of community in shaping the networks of environmental concern in local context for global effect.

  1. Competency model for the project managers of technical projects

    NASA Astrophysics Data System (ADS)

    Duncan, William R.

    1992-05-01

    Traditional job description techniques were developed to support compensation decisions for hourly wage earners in a manufacturing environment. Their resultant focus on activities performed on the job works well in this environment where the ability to perform the activity adequately is objectively verifiable by testing and observation. Although many organizations have adapted these techniques for salaried employees and service environments, the focus on activities performed has never been satisfactory. For example, stating that a project manager `prepares regular project status reports' tells us little about what to look for in a potential project manager or how to determine if a practicing project manager is ready for additional responsibilities. The concept of a `competency model' has been developed within the last decade to address this shortcoming. Competency models focus on what skills are needed to perform the tasks defined by the job description. For example, a project manager must be able to communicate well both orally and in writing in order to `prepare regular project status reports.'

  2. When Serious Project Management is a Critical Business Requirement

    NASA Technical Reports Server (NTRS)

    Jansma, P. A.; Gibby, L.; Chambers, C.; Joines, J.; Egger, R.

    2000-01-01

    When serious project management is a critical business requirement, project managers need to integrate cost, schedule and technical scope of work across the project, and apply earned value management (EVM).

  3. When Serious Project Management is a Critical Business Requirement

    NASA Technical Reports Server (NTRS)

    Jansma, P. A.; Gibby, L.; Chambers, C.; Joines, J.; Egger, R.

    2000-01-01

    When serious project management is a critical business requirement, project managers need to integrate cost, schedule and technical scope of work across the project, and apply earned value management (EVM).

  4. An Analysis of the Relationship Between Environmental Management and Environmental Compliance at Marine Corps Installations

    DTIC Science & Technology

    2005-03-01

    Organizational Factors Affect an Environmental Management program.......... 22 3. EMS Model for ISO 14001 ...generic environmental management framework known as the Environmental Management System (EMS), published in 1995 as part of the ISO 14001 standard...management based on the ISO 14001 ’s EMS framework. However, few practical studies have indicated which facets of environmental management are the most

  5. Project management techniques for highly integrated programs

    NASA Technical Reports Server (NTRS)

    Stewart, J. F.; Bauer, C. A.

    1983-01-01

    The management and control of a representative, highly integrated high-technology project, in the X-29A aircraft flight test project is addressed. The X-29A research aircraft required the development and integration of eight distinct technologies in one aircraft. The project management system developed for the X-29A flight test program focuses on the dynamic interactions and the the intercommunication among components of the system. The insights gained from the new conceptual framework permitted subordination of departments to more functional units of decisionmaking, information processing, and communication networks. These processes were used to develop a project management system for the X-29A around the information flows that minimized the effects inherent in sampled-data systems and exploited the closed-loop multivariable nature of highly integrated projects.

  6. Kalispell Maintenance Headquarters Project : Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration.

    1991-01-01

    The facilities needed to maintain and repair Bonneville Power Administration (BPA's) electrical equipment in northwest Montana are currently in two locations: A maintenance headquarters at the Kalispell Substation, and a temporary leased facility south of Kalispell. The present situation is not efficient. There is not enough space to accommodate the equipment needed at each site, and coordination and communication between the two sites is difficult. Also, two sites means duplication of equipment and facilities. BPA needs a single, centralized facility that would efficiently accommodate all the area's maintenance activities and equipment. BPA proposes to build a maintenance headquarters facility consisting of 2 to 4 single-story buildings totaling about 35,000 square feet (office spaces and workshop areas); an open-ended vehicle storage building (carport style); a fenced-in storage year; a storage building for flammables, herbicides, and hazardous wastes; and a parking lot. The facility would require developing about 6 to 10 acres of land. Two sites are being considered for the proposed project (see the attached map for locations). This report is the environmental assessment of the two options.

  7. Project management oversight; Controversy or remedy

    SciTech Connect

    Lovejoy, N.B.; Mortensen, M.W. )

    1989-01-01

    In today's complex and litigious society with construction projects becoming ever more sophisticated, owners can no longer accept as a given that hiring a design engineer, construction manager, general contractor or an engineer procure construct (EPC) contractor ensures that their project will be well managed to complete on time and within budget. Mega capital projects today routinely encounter cost overruns and schedule delays. These circumstances create management problems, finger pointing, and lead to contractor claims which are becoming a major source of concern. This paper discusses one such avenue open to today's owners, to utilize the services of a project management oversight (PMO) consultant. PMO is a relatively new concept within the construction industry and as such is the subject of ongoing discussion and debate regarding its value.

  8. Risk management integration into complex project organizations

    NASA Technical Reports Server (NTRS)

    Fisher, K.; Greanias, G.; Rose, J.; Dumas, R.

    2002-01-01

    This paper describes the approach used in designing and adapting the SIRTF prototype, discusses some of the lessons learned in developing the SIRTF prototype, and explains the adaptability of the risk management database to varying levels project complexity.

  9. Risk management integration into complex project organizations

    NASA Technical Reports Server (NTRS)

    Fisher, K.; Greanias, G.; Rose, J.; Dumas, R.

    2002-01-01

    This paper describes the approach used in designing and adapting the SIRTF prototype, discusses some of the lessons learned in developing the SIRTF prototype, and explains the adaptability of the risk management database to varying levels project complexity.

  10. [Environmental management: critical analysis, scenarios and challenges].

    PubMed

    Porto, Marcelo Firpo de Souza; Schütz, Gabriel Eduardo

    2012-06-01

    This article discusses the limits, alternatives and challenges of environmental management in contemporary globalized capitalist societies. It is based on a critical analysis supported by authors from social sciences, political ecology and public health. To this end, we systematize the meaning of hegemonic environmental management in terms of eco-efficiency and its limits to tackle environmental risks and construct democratic processes and societies. We developed four ideal scenarios involving possible combinations of environmental management and democracy. This model served as a base, together with academic studies and the theoretical and militant experience of the authors, for a reflection on the current characteristics and future trends of environmental management and democracy, with emphasis on the reality of Latin America, specifically Brazil. Lastly, we discuss possibilities for social transformation taking into consideration the contradictions and emancipatory alternatives resulting from confrontations between hegemonic tendencies of the market and counter-hegemonic utopias and social movements. The latter assume principles of environmental justice, economic solidarity, agro-ecology and sustainability as well as the construction of new epistemologies.

  11. Forecast Inaccuracies in Power Plant Projects From Project Managers' Perspectives

    NASA Astrophysics Data System (ADS)

    Sanabria, Orlando

    Guided by organizational theory, this phenomenological study explored the factors affecting forecast preparation and inaccuracies during the construction of fossil fuel-fired power plants in the United States. Forecast inaccuracies can create financial stress and uncertain profits during the project construction phase. A combination of purposeful and snowball sampling supported the selection of participants. Twenty project managers with over 15 years of experience in power generation and project experience across the United States were interviewed within a 2-month period. From the inductive codification and descriptive analysis, 5 themes emerged: (a) project monitoring, (b) cost control, (c) management review frequency, (d) factors to achieve a precise forecast, and (e) factors causing forecast inaccuracies. The findings of the study showed the factors necessary to achieve a precise forecast includes a detailed project schedule, accurate labor cost estimates, monthly project reviews and risk assessment, and proper utilization of accounting systems to monitor costs. The primary factors reported as causing forecast inaccuracies were cost overruns by subcontractors, scope gaps, labor cost and availability of labor, and equipment and material cost. Results of this study could improve planning accuracy and the effective use of resources during construction of power plants. The study results could contribute to social change by providing a framework to project managers to lessen forecast inaccuracies, and promote construction of power plants that will generate employment opportunities and economic development.

  12. Managing military training-related environmental disturbance.

    PubMed

    Zentelis, Rick; Banks, Sam; Roberts, J Dale; Dovers, Stephen; Lindenmayer, David

    2017-09-17

    Military Training Areas (MTAs) cover at least 2 percent of the Earth's terrestrial surface and occur in all major biomes. These areas are potentially important for biodiversity conservation. The greatest challenge in managing MTAs is balancing the disturbance associated with military training and environmental values. These challenges are unique as no other land use is managed for these types of anthropogenic disturbances in a natural setting. We investigated how military training-related disturbance is best managed on MTAs. Specifically, we explored management options to maximise the amount of military training that can be undertaken on a MTA while minimising the amount of environmental disturbance. MTAs comprise of a number of ranges designed to facilitate different types of military training. We simulated military training-related environmental disturbance at different range usage rates under a typical range rotation use strategy, and compared the results to estimated ecosystem recovery rates from training activities. We found that even at relatively low simulated usage rates, random allocation and random spatial use of training ranges within an MTA resulted in environmental degradation under realistic ecological recovery rates. To avoid large scale environmental degradation, we developed a decision-making tool that details the best method for managing training-related disturbance by determining how training activities can be allocated to training ranges. Copyright © 2017 Elsevier Ltd. All rights reserved.

  13. Cultural differences in Research project management

    NASA Astrophysics Data System (ADS)

    Barbier, Michele

    2016-04-01

    Scientific Projects today have increased in complexity, requiring multidisciplinarity, and requiring a mix of diverse individuals from different countries who must be integrated into an effective project. Effective team building is one of the prime responsibilities of the project manager. When the project is supported by a funding, the integration and the implication of the different partners are quite easy. Particularly when partners are developing high-performing teams. However, management of research project requires further skills when the budget is not very high and/or when partners are from non-European countries and are not using the same vocabulary. The various cultures, values, beliefs and social usages, particularly with Mediterranean countries cause a special style of communication for an individual or group of individuals. This communication style participates in the success of the project and encompasses a lot of diplomatic skills which will be highlighted.

  14. Scoping session of the programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Project

    SciTech Connect

    1992-12-31

    This document is about the scoping session which was held at the Community Center in Falls City, Texas. The purpose was to obtain public comment on the Programmatic Environmental Impact Statement for the Uranium Mill Tailings Remedial Action Project (UMTRA), specifically on the ground water project. Presentations made by the manager for the entire UMTRA program, manager of the site and ground water program, comments made by two residents of Fall City are included in this document.

  15. ENVIRONMENTAL SYSTEMS MANAGEMENT: TOWARDS A NEW SCIENCE OF SUSTAINABLE ENVIRONMENTAL MANAGEMENT

    EPA Science Inventory

    Environmental Systems Management (ESM) is the management of environmental problems at the systems level fully accounting for the multi-dimensional nature of the environment. This includes socio-economic dimensions as well as the usual physical and life science aspects of environm...

  16. ENVIRONMENTAL SYSTEMS MANAGEMENT: TOWARDS A NEW SCIENCE OF SUSTAINABLE ENVIRONMENTAL MANAGEMENT

    EPA Science Inventory

    Environmental Systems Management (ESM) is the management of environmental problems at the systems level fully accounting for the multi-dimensional nature of the environment. This includes socio-economic dimensions as well as the usual physical and life science aspects of environm...

  17. Graduate Student Project: Employer Operations Management Analysis

    ERIC Educational Resources Information Center

    Fish, Lynn A.

    2008-01-01

    Part-time graduate students at an Association to Advance Collegiate Schools of Business-accredited college complete a unique project by applying operations management concepts to their current employer. More than 92% of 368 graduates indicated that this experiential project was a positive learning experience, and results show a positive impact on…

  18. Evaluation of the School Administration Manager Project

    ERIC Educational Resources Information Center

    Turnbull, Brenda J.; Haslam, M. Bruce; Arcaira, Erikson R.; Riley, Derek L.; Sinclair, Beth; Coleman, Stephen

    2009-01-01

    The School Administration Manager (SAM) project, supported by The Wallace Foundation as part of its education initiative, focuses on changing the conditions in schools that prevent principals from devoting more time to instructional leadership. In schools participating in the National SAM Project, principals have made a commitment to increase the…

  19. Waste management project technical baseline description

    SciTech Connect

    Sederburg, J.P.

    1997-08-13

    A systems engineering approach has been taken to describe the technical baseline under which the Waste Management Project is currently operating. The document contains a mission analysis, function analysis, requirement analysis, interface definitions, alternative analysis, system definition, documentation requirements, implementation definitions, and discussion of uncertainties facing the Project.

  20. Graduate Student Project: Employer Operations Management Analysis

    ERIC Educational Resources Information Center

    Fish, Lynn A.

    2008-01-01

    Part-time graduate students at an Association to Advance Collegiate Schools of Business-accredited college complete a unique project by applying operations management concepts to their current employer. More than 92% of 368 graduates indicated that this experiential project was a positive learning experience, and results show a positive impact on…

  1. DOE Office of Environmental Management, 2016 Year in Review

    SciTech Connect

    2016-12-01

    2016 accomplishments and primary areas of focus for the Department of Energy's (DOE's) Office of Environmental Management and EM sites are presented. For DOE EM, these include Focusing on the Field, Teaming with Cleanup Partners, Developing New Technology, and Maximizing Cleanup Dollars. Major 2016 achievements are highlighted for EM, Richland Operations Office, Office of River Protection, Savannah River Site, Oak Ridge, Idaho, Waste Isolation Pilot Plant, Los Alamos, Portsmouth, Paducah, West Valley Demonstration Project, and the Nevada National Security Site,

  2. Hanford Environmental Dose Reconstruction Project: Monthly technical report

    SciTech Connect

    Not Available

    1988-05-01

    This monthly report summarizes the technical progress and project status for the Hanford Environmental Dose Reconstruction (HEDR) Project being conducted at Pacific Northwest Laboratory (PNL) under the direction of a Technical Steering Panel (TSP). The TSP is composed of experts in numerous technical fields related to this project and represents the interests of the public. The Department of Energy (DOE) funds the project and represents the interests of the federal government and the public. The organization for the project is outlined.

  3. 24 CFR 50.22 - Environmental management and monitoring.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Environmental management and... and Urban Development PROTECTION AND ENHANCEMENT OF ENVIRONMENTAL QUALITY General Policy: Environmental Review Procedures § 50.22 Environmental management and monitoring. An Environmental Management and...

  4. 24 CFR 50.22 - Environmental management and monitoring.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Environmental management and... and Urban Development PROTECTION AND ENHANCEMENT OF ENVIRONMENTAL QUALITY General Policy: Environmental Review Procedures § 50.22 Environmental management and monitoring. An Environmental Management and...

  5. 24 CFR 50.22 - Environmental management and monitoring.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 1 2013-04-01 2013-04-01 false Environmental management and... and Urban Development PROTECTION AND ENHANCEMENT OF ENVIRONMENTAL QUALITY General Policy: Environmental Review Procedures § 50.22 Environmental management and monitoring. An Environmental Management and...

  6. 24 CFR 50.22 - Environmental management and monitoring.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Environmental management and... and Urban Development PROTECTION AND ENHANCEMENT OF ENVIRONMENTAL QUALITY General Policy: Environmental Review Procedures § 50.22 Environmental management and monitoring. An Environmental Management and...

  7. 24 CFR 50.22 - Environmental management and monitoring.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Environmental management and... and Urban Development PROTECTION AND ENHANCEMENT OF ENVIRONMENTAL QUALITY General Policy: Environmental Review Procedures § 50.22 Environmental management and monitoring. An Environmental Management and...

  8. 77 FR 2283 - Environmental Management Site-Specific Advisory Board, Portsmouth

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-17

    ... Environmental Management Site-Specific Advisory Board, Portsmouth AGENCY: Department of Energy (DOE). ACTION: Notice of open meeting. SUMMARY: This notice announces a meeting of the Environmental Management Site..., Department of Energy Portsmouth/Paducah Project Office, Post Office Box 700, Piketon, Ohio 45661, (740)...

  9. 77 FR 6790 - Environmental Management Site-Specific Advisory Board, Portsmouth

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-09

    ... Environmental Management Site-Specific Advisory Board, Portsmouth AGENCY: Department of Energy (DOE). ACTION: Notice of open meeting. SUMMARY: This notice announces a meeting of the Environmental Management Site..., Department of Energy Portsmouth/Paducah Project Office, Post Office Box 700, Piketon, Ohio 45661, (740)...

  10. 40 CFR 262.107 - Under what circumstances will a university's participation in this environmental management...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... university's participation in this environmental management standard pilot be terminated? 262.107 Section 262...) STANDARDS APPLICABLE TO GENERATORS OF HAZARDOUS WASTE University Laboratories XL Project-Laboratory Environmental Management Standard § 262.107 Under what circumstances will a university's participation in...

  11. A Novel Project Management Theory and Its Applicability

    DTIC Science & Technology

    2008-03-01

    MANAGEMENT? PMBOOK 2000 defines Project Management as “the application of knowledge, skills, tools, techniques to project activities to meet project...participating in the project. 2. The Modeling Tool Includes All Aspects of the Software Projects PMBOOK identifies related areas to project management that a

  12. Environmental projects. Volume 16: Waste minimization assessment

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The Goldstone Deep Space Communications Complex (GDSCC), located in the MoJave Desert, is part of the National Aeronautics and Space Administration's (NASA's) Deep Space Network (DSN), the world's largest and most sensitive scientific telecommunications and radio navigation network. The Goldstone Complex is operated for NASA by the Jet Propulsion Laboratory. At present, activities at the GDSCC support the operation of nine parabolic dish antennas situated at five separate locations known as 'sites.' Each of the five sites at the GDSCC has one or more antennas, called 'Deep Space Stations' (DSS's). In the course of operation of these DSS's, various hazardous and non-hazardous wastes are generated. In 1992, JPL retained Kleinfelder, Inc., San Diego, California, to quantify the various streams of hazardous and non-hazardous wastes generated at the GDSCC. In June 1992, Kleinfelder, Inc., submitted a report to JPL entitled 'Waste Minimization Assessment.' This present volume is a JPL-expanded version of the Kleinfelder, Inc. report. The 'Waste Minimization Assessment' report did not find any deficiencies in the various waste-management programs now practiced at the GDSCC, and it found that these programs are being carried out in accordance with environmental rules and regulations.

  13. Improving the management of environmental health.

    PubMed Central

    Lave, L B

    1985-01-01

    Environmental health regulation has been developed on the premise that both problems and solutions are obvious, requiring only attention and commitment. The result has been impossible legislative goals and frenetic, unfocused agency efforts to deal with too many issues. Preventing all environmental health problems is impossible and not the best approach; instead, attention ought to be shifted toward reacting quickly to problems before irreversible, severe health damage has occurred. Rather than having regulatory agencies attempt to manage all problems, they should be focused on exemplifying goals and productive approaches, and on handling a few major issues. Regulatory agencies should be managing the nonregulatory institutions to ensure that they are effective in dealing with the myriad issues that the agencies will never be able to handle. The inherent limitations of federal regulatory agencies must be recognized to restructure environmental health management to be more effective in lowering risks while being efficient, administratively simple, and more equitable. PMID:4085439

  14. 75 FR 19989 - Final Environmental Impact Statement for Drought Management Planning at the Kerr Hydroelectric...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-16

    ... Management Planning at the Kerr Hydroelectric Project, Flathead Lake, Montana, is now available for public... Bureau of Indian Affairs Final Environmental Impact Statement for Drought Management Planning at the Kerr Hydroelectric Project, Flathead Lake, MT AGENCY: Bureau of Indian Affairs, Interior. ACTION: Notice...

  15. 78 FR 2685 - Central Utah Project Completion Act; East Hobble Creek Restoration Project Draft Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-14

    ... Office of the Secretary Central Utah Project Completion Act; East Hobble Creek Restoration Project Draft...: Notice of availability. SUMMARY: The draft environmental assessment for the East Hobble Creek Restoration Project is available for public review and comment. The assessment analyzes the anticipated environmental...

  16. River Bank Erosion and the Influence of Environmental Flow Management.

    PubMed

    Vietz, Geoff J; Lintern, Anna; Webb, J Angus; Straccione, David

    2017-04-06

    Environmental flows aim to influence river hydrology to provide appropriate physical conditions for ecological functioning within the restrictions of flow regulation. The hydrologic characteristics of flow events, however, may also lead to unintended morphologic effects in rivers, such as increases in riverbank erosion beyond natural rates. This may negatively impact habitat for biota, riparian infrastructure, and land use. Strategic environmental flow delivery linked to monitoring and adaptive management can help mitigate risks. We monitor riverbank condition (erosion and deposition) relative to environmental flows on the Goulburn River, Victoria, Australia. We describe the process of adaptive management aimed at reducing potential impacts of flow management on bank condition. Field measurements (erosion pins) quantify the hydrogeomorphic response of banks to the delivery of planned and natural flow events. Managed flows provide opportunities for monitoring riverbank response to flows, which in turn informs planning. The results demonstrate that environmental flows have little influence on bank erosion and visual perceptions in the absence of monitoring are an unreliable guide. This monitoring project represents a mutually beneficial, science-practice partnership demonstrating that a traditional 'know then do' approach can be foreshortened by close collaboration between researchers and managers. To do so requires transparent, often informal lines of communication. The benefits for researchers-a more strategic and targeted approach to monitoring activities; and benefits for the practitioners-reduced time between actions and understanding response; mean that a learn by doing approach is likely to have better outcomes for researchers, stakeholders, the public, and the environment.

  17. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1993-01-01

    This volume is the sixth in an ongoing series on aerospace project management at NASA. Articles in this volume cover evolution of NASA cost estimating; SAM 2; National Space Science Program: strategies to maximize science return; and human needs, motivation, and results of the NASA culture surveys. A section on resources for NASA managers rounds out the publication.

  18. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor); Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1995-01-01

    This volume is the ninth in an ongoing series on aerospace project management at NASA. Articles in this volume cover evolution of NASA cost estimating; SAM 2; National Space Science Program: strategies to maximize science return; and human needs, motivation, and results of the NASA culture surveys. A section on resources for NASA managers rounds out the publication.

  19. Environmental Restoration Program Control Management System

    SciTech Connect

    Duke, R.T.

    1992-08-13

    Environmental Restoration managers need to demonstrate that their programs are under control. Unlike most industrial programs, the public is heavily involved in Environmental Restoration activities. The public is demanding that the country prove that real progress is being made towards cleaning up the environment. A Program Control Management System can fill this need. It provides a structure for planning, work authorization, data accumulation, data analysis and change control. But it takes time to implement a control system and the public is losing its patience. This paper describes critical items essential to the quick development and implementation of a successful control system.

  20. Project Manager’s Handbook

    DTIC Science & Technology

    1996-09-30

    Kirtland AFB, New Mexico , which had responsibility for environmental quality R&D. Subsequent realignments carried Environics through the Civil and...Some examples are bioventing of soil to bring about accelerated biodegradation of fuel contaminants and use of a cone penetrometer with a