Sample records for environmental readiness document

  1. Maintenance action readiness assessment plan for White Oak Creek and Melton Branch Weir Stilling Pool cleanout at Oak Ridge National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-08-01

    This Readiness Assessment Plan has been prepared to document operational readiness for the following maintenance action: (1) removal of sediment from the White Oak Creek and Melton Branch Weir Stilling Pools and (2) disposal of the radiologically contaminated sediment in another location upstream of the weirs in an area previously contaminated by stream overflow from Melton Branch in Waste Area Grouping 2 (WAG) at Oak Ridge National Laboratory. This project is being performed as a maintenance action rather than an action under the Comprehensive Environmental Response, Compensation, and Liability Act because the risk to human health and environment is wellmore » below the US Environmental Protection Agency`s level of concern. The decision to proceed as a maintenance action was documented by an interim action proposed plan, which is included in the administrative record. The administrative record is available for review at the US Department of Energy Information Resource Center, 105 Broadway Avenue, Oak Ridge, Tennessee 37830.« less

  2. Traumatic Brain Injury in Young Children: Post-Acute Effects on Cognitive and School Readiness Skills

    PubMed Central

    Taylor, H. Gerry; Swartwout, Maegan; Yeates, Keith O.; Walz, Nicolay C.; Stancin, Terry; Wade, Shari L.

    2009-01-01

    Previous studies have documented weaknesses in cognitive ability and early academic readiness in young children with traumatic brain injury (TBI). However, few of these studies have rigorously controlled for demographic characteristics, examined the effects of TBI severity on a wide range of skills, or explored moderating influences of environmental factors on outcomes. To meet these objectives, each of three groups of children with TBI (20 with severe, 64 with moderate, and 15 with mild) were compared with a group of 117 children with orthopedic injuries (OI group). The children were hospitalized for their injuries between 3 and 6 years of age and were assessed an average of 1½ months post injury. Analysis revealed generalized weaknesses in cognitive and school readiness skills in the severe TBI group and suggested less pervasive effects of moderate and mild TBI. Indices of TBI severity predicted outcomes within the TBI sample and environmental factors moderated the effects of TBI on some measures. The findings document adverse effects of TBI in early childhood on post-acute cognitive and school readiness skills and indicate that residual deficits are related to both injury severity and the family environment. PMID:18764969

  3. The Development and Initial Evaluation of the Human Readiness Level Framework

    DTIC Science & Technology

    2010-06-01

    View ICD Initial Capabilities Document ICW Interactive Course Ware ILE Interactive Learning Environment ILT Instructor Led Training IOC...Programmatic Environmental Safety and Health Evaluation PHA Preliminary Hazard Analysis PHL Preliminary Hazard List xiv PM Program Manager PQS...Occupational Health SOW Statement of Work SRD System Requirements Document SPS System Performance Specification SRR System Requirements Review SVR

  4. ENVIRONMENTAL TECHNOLOGY VERIFICATION REPORT; RECHARGEABLE ALKALINE HOUSEHOLD BATTERY SYSTEM; RAYOVAC CORPORATION, RENEWAL

    EPA Science Inventory

    The EPA's ETV Program, in partnership with recognized testing organizations, objectively and systematically documents the performance of commercial ready technologies. Together, with the full participation of the technology developer, develop plans, conduct tests, collect and ana...

  5. Wastewater Sampling Methodologies and Flow Measurement Techniques.

    ERIC Educational Resources Information Center

    Harris, Daniel J.; Keffer, William J.

    This document provides a ready source of information about water/wastewater sampling activities using various commercial sampling and flow measurement devices. The report consolidates the findings and summarizes the activities, experiences, sampling methods, and field measurement techniques conducted by the Environmental Protection Agency (EPA),…

  6. 75 FR 39680 - Santiam Water Control District; Notice of Application Ready for Environmental Analysis, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-12

    ..., Conditions, and Recommendations July 2, 2010. Take notice that the following hydroelectric application has..., recommendations, terms and conditions: 60 days from the issuance date of this notice; reply comments are due 105... of the document on that resource agency. Comments, recommendations, terms and conditions may be filed...

  7. 75 FR 37421 - Santiam Water Control District; Notice of Application Ready for Environmental Analysis, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-29

    ... Conditions, and Recommendations June 22, 2010. Take notice that the following hydroelectric application has..., recommendations, terms and conditions: 60 days from the issuance date of this notice; reply comments are due 105... of the document on that resource agency. Comments, recommendations, terms and conditions may be filed...

  8. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Environmental Engineering Committee conducted a preliminary review of the above document in March 1986, and identified obvious errors or omissions which are explained in detail in its initial report. The Office of Solid Waste asked the Committee to review the final draft ACL guidance when it was ready for publications in the Federal Register. This report represents the Committee's review of the final draft which was found to be well-written and technically sound.

  9. 3 CFR - Delegation of Authority To Appoint Commissioned Officers of the Ready Reserve Corps of the Public...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 3 The President 1 2014-01-01 2014-01-01 false Delegation of Authority To Appoint Commissioned Officers of the Ready Reserve Corps of the Public Health Service Presidential Documents Other Presidential Documents Memorandum of March 29, 2013 Delegation of Authority To Appoint Commissioned Officers of the Ready Reserve Corps of the Public Health...

  10. 3 CFR - Delegation of Authority To Appoint Commissioned Officers of the Ready Reserve Corps of the Public...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 3 The President 1 2012-01-01 2012-01-01 false Delegation of Authority To Appoint Commissioned Officers of the Ready Reserve Corps of the Public Health Service Presidential Documents Other Presidential Documents Memorandum of May 31, 2011 Delegation of Authority To Appoint Commissioned Officers of the Ready Reserve Corps of the Public Health...

  11. 75 FR 65620 - Inglis Hydropower, LLC; Notice of Application Ready for Environmental Analysis and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-26

    ... Hydropower, LLC; Notice of Application Ready for Environmental Analysis and Soliciting Comments...: Inglis Hydropower, LLC. e. Name of Project: Inglis Hydropower Project. f. Location: The project would be... ready for environmental analysis at this time. l. The proposed 2.0-megawatt Inglis Hydropower Project...

  12. The genetic-environmental etiology of cognitive school readiness and later academic achievement in early childhood.

    PubMed

    Lemelin, Jean-Pascal; Boivin, Michel; Forget-Dubois, Nadine; Dionne, Ginette; Séguin, Jean R; Brendgen, Mara; Vitaro, Frank; Tremblay, Richard E; Pérusse, Daniel

    2007-01-01

    Using a genetic design of 840 60-month-old twins, this study investigated the genetic and environmental contributions to (a) individual differences in four components of cognitive school readiness, (b) the general ability underlying these four components, and (c) the predictive association between school readiness and school achievement. Results revealed that the contribution of the shared environment for cognitive school readiness was substantial. Genetic effects were more important for the core abilities underlying school readiness than for each specific skill, although shared environment remained the largest factor overall. Genetic, shared, and nonshared environmental factors all accounted for the predictive association between school readiness and early school achievement. These results contribute to a better understanding of the early determinants of school readiness.

  13. No Further Action Decision Document for Site 8 at Alpena Combat Readiness Training Center, Alpena, Michigan.

    DTIC Science & Technology

    1998-04-01

    INSTALLATION RESTORATION PROGRAM No FURTHER REMEDIAL ACTION PLANNED DECISION DOCUMENT FOR SITE 8 FINAL MICHIGAN AIR NATIONAL GUARD ALPENA ...COMBAT READINESS TRAINING CENTER ALPENA , MICHIGAN April 1998 Air National Guard Andrews AFB, Maryland fr r=.~r i^:r^f>^’ m% Approved for public...Document 4. TITLE AND SUBTITLE No Further Action Decision Document for Site 8 at Alpena CRTC, Alpena , MI. 6. AUTHOR(S) N/A 7. PERFORMING

  14. 48 CFR 1552.208-70 - Printing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...” (or “camera-ready copy”) is a final document suitable for printing/duplication. “Desktop Publishing... from desktop publishing is being sent to a typesetting device (i.e., Linotronic) with camera copy being... preparing related illustrative material to a final document (camera-ready copy) using desktop publishing. (2...

  15. Connected Vehicle Pilot Deployment Program phase 1 : deployment readiness summary : New York City : final report.

    DOT National Transportation Integrated Search

    2016-09-09

    This document describes the Deployment Readiness Summary for the New York City (NYC) Connected Vehicle Pilot Deployment (CVPD) Project. It demonstrates the completion of Task 1-12 deliverables of Phase 1 by the NYC team. The document also addresses h...

  16. Selected DOE Headquarters publications, October 1979-

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1980-11-01

    This publication provides a cumulative listing of and an index to DOE headquarters publications issued since October 1979. (Publications issued during October 1977 to September 1979 are covered in DOE/AD-0010/6.) Three types of headquarters publications are included: publications dealing mainly with program and policy that are attributed to and issued by headquarters organizations, reports prepared by contractors (and published by DOE) to describe research and development work they have performed for the Department, and environmental development plans, environmental impact statements, and environmental readiness documents. Certain publications have been omitted. They include such items as pamphlets, fact sheets, bulletins, newsletters, andmore » telephone directories. Also omitted are weekly/monthly reports of the Energy Information Administration and headquarters publications issued under the DOE-tr and CONF codes. (RWR)« less

  17. The Genetic-Environmental Etiology of Cognitive School Readiness and Later Academic Achievement in Early Childhood

    ERIC Educational Resources Information Center

    Lemelin, Jean-Pascal; Boivin, Michel; Forget-Dubois, Nadine; Dionne, Ginette; Seguin, Jean R.; Brendgen, Mara; Vitaro, Frank; Tremblay, Richard E.; Perusse, Daniel

    2007-01-01

    Using a genetic design of 840 60-month-old twins, this study investigated the genetic and environmental contributions to (a) individual differences in four components of cognitive school readiness, (b) the general ability underlying these four components, and (c) the predictive association between school readiness and school achievement. Results…

  18. College Readiness versus College Worthiness: Examining the Role of Principal Beliefs on College Readiness Initiatives in an Urban U.S. High School

    ERIC Educational Resources Information Center

    Convertino, Christina; Graboski-Bauer, Ashley

    2018-01-01

    In light of increasing emphasis on the importance of post-secondary education to personal economic security, there is growing interest to promote college readiness initiatives in high schools, particularly for low-income and minority students for whom the harmful effects of institutional inequities on college readiness is well-documented.…

  19. Evaluating Community Readiness to Implement Environmental and Policy-Based Alcohol Abuse Prevention Strategies in Wisconsin

    PubMed Central

    Paltzer, Jason; Black, Penny; Moberg, D. Paul

    2013-01-01

    Background Matching evidence-based alcohol prevention strategies with a community’s readiness to support those strategies is the basis for the Tri-Ethnic Community Readiness Model (CRM). The purpose of this evaluation was to assess the association of a community’s readiness to address alcohol abuse in their community with the implementation of environmental and policy-based strategies. Methods Twenty-one substance abuse prevention coalitions in Wisconsin participated in a pre-post intervention group-only evaluation using the CRM. As part of a Substance Abuse and Mental Health Services Administration (SAMHSA) grant, all grantees were obligated by the Wisconsin Department of Health Services to implement environmental and policy-based strategies focused on one of three priority areas: young adult binge drinking, underage drinking, and alcohol-related motor-vehicle injuries and fatalities. Results At baseline, all communities (n=21) scored at or below a Stage 4 (on a scale of 1–9) readiness level (“preparedness”). The mean change in community readiness over the three-year period (2009–2011) was significant, but was less than one complete CRM stage (0.77, p=<0.001; 95% CI: 0.49, 1.05). Conclusion These findings suggest that implementation of environmental and policy-based strategies may improve a community’s progression in perceived readiness to address alcohol abuse regardless of the community’s baseline level of readiness to address alcohol abuse. Recommendation An assessment specific for measuring community readiness for policy-related strategies should be developed. The assessment would include community-level factors (e.g. community climate) for implementing policy-related prevention strategies, and not assume a linear readiness model. PMID:25346555

  20. The First Pennsylvania Environmental Readiness for the 21st Century Survey Report: Survey of Adult Pennsylvanians' Knowledge about, Attitudes toward and Behaviors Related to the Environment.

    ERIC Educational Resources Information Center

    Johnson, Paulette; Smith-Sebasto, Nicholas J.

    This report presents the results of the First Pennsylvania Environmental Readiness for the 21st Century which investigates the attitudes, knowledge, and behaviors of Pennsylvanian adults towards the environment. The survey questions were divided into four categories: (1) environmental literacy; (2) environmental attitudes; (3) environmental…

  1. Installation Restoration Program Decision Document. Site 15. Alpena Combat Readiness Training Center, Michigan Air National Guard, Alpena County Regional Airport, Alpena, Michigan.

    DTIC Science & Technology

    1996-05-01

    This Decision Document (DD) supports the no further action alternative for Site 15 - Oiled Roads at the Alpena Combat Readiness Training Center (CRTC...in Alpena , Michigan. The purpose of the DD is to summarize the existing data for the site and describe the Air National Guard’s rational for selecting the no further action alternative.

  2. Apollo experience report the command and service module milestone review process

    NASA Technical Reports Server (NTRS)

    Brendle, H. L.; York, J. A.

    1974-01-01

    The sequence of the command and service module milestone review process is given, and the Customer Acceptance Readiness Review and Flight Readiness Review plans are presented. Contents of the System Summary Acceptance Documents for the two formal spacecraft reviews are detailed, and supplemental data required for presentation to the review boards are listed. Typical forms, correspondence, supporting documentation, and minutes of a board meeting are included.

  3. "Ready To Learn" Transmedia Demonstration Station Study: A Report to the CPB-PBS "Ready to Learn Initiative"

    ERIC Educational Resources Information Center

    Pasnik, Shelley; Llorente, Carlin

    2012-01-01

    The 2012 Transmedia Demonstration Stations program study is part of the multiyear CPB-PBS "Ready To Learn" summative evaluation initiative by Education Development Center, Inc., (EDC) and SRI International (SRI). Through a series of related studies, the authors are documenting, and, whenever possible, measuring the impact of PBS KIDS…

  4. Readiness for living technology: a comparative study of the uptake of robot technology in the Danish health-care sector.

    PubMed

    Peronard, Jean-Paul

    2013-01-01

    This article is a comparative analysis between workers in health care with high and low degree of readiness for living technology such as robotics. To explore the differences among workers' readiness, statistical analysis was conducted in a data set obtained from 200 respondents. The results showed important differences between high- and low-readiness types on issues such as staff security, documentation, autonomy, and future challenges.

  5. Urban Combat Advanced Training Technology (Technologie Avancee d’Entrainement au Combat Urbain)

    DTIC Science & Technology

    2010-04-01

    JRTC Joint Readiness Training Center JRTC-MOUT-IS Joint Readiness Training Center Military Operations in Urbanised Terrain Instrumentation System...did not support or identify joint or multi-national requirements for conducting effective military operations in an urbanised environment. Very few...Requirements Document (ORD) for the Joint Readiness Training Center (JRTC) Military Operations on Urbanised Terrain (MOUT) Instrumentation System

  6. CDC/NACCHO Accreditation Support Initiative: advancing readiness for local and tribal health department accreditation.

    PubMed

    Monteiro, Erinn; Fisher, Jessica Solomon; Daub, Teresa; Zamperetti, Michelle Chuk

    2014-01-01

    Health departments have various unique needs that must be addressed in preparing for national accreditation. These needs require time and resources, shortages that many health departments face. The Accreditation Support Initiative's goal was to test the assumption that even small amounts of dedicated funding can help health departments make important progress in their readiness to apply for and achieve accreditation. Participating sites' scopes of work were unique to the needs of each site and based on the proposed activities outlined in their applications. Deliverables and various sources of data were collected from sites throughout the project period (December 2011-May 2012). Awardees included 1 tribal and 12 local health departments, as well as 5 organizations supporting the readiness of local and tribal health departments. Sites dedicated their funding toward staff time, accreditation fees, completion of documentation, and other accreditation readiness needs and produced a number of deliverables and example documents. All sites indicated that they made accreditation readiness gains that would not have occurred without this funding. Preliminary evaluation data from the first year of the Accreditation Support Initiative indicate that flexible funding arrangements may be an effective way to increase health departments' accreditation readiness.

  7. Characterization of environmental cues for initiation of reproductive cycling and spawning in shovelnose sturgeon Scaphirhynchus platorynchus in the Lower Missouri River, USA

    USGS Publications Warehouse

    Papoulias, D.M.; DeLonay, A.J.; Annis, M.L.; Wildhaber, M.L.; Tillitt, D.E.

    2011-01-01

    We presume that the shovelnose sturgeon (Scaphirhynchus platorynchus) has evolved to spawn in the springtime when environmental conditions are at some optimum, but this state has not yet been defined. In this study physiological readiness to spawn in shovelnose sturgeon was examined to define more closely when spawning could occur and thus identify and evaluate prevailing environmental conditions that could cue spawning during that period. Reproductive assessments of Lower Missouri River shovelnose during 4 years (2005-2008) and at two locations (Gavins Point Dam, South Dakota and Boonville, Missouri) were used to identify shovelnose sturgeon spawning periods. Initiation of the spawning period, as defined by the presence of reproductively ready fish, was a highly predictable yearly event and extended over several weeks at each reach. The spawning period occurred earlier in the lower reach than in the upper reach and environmental conditions during the periods varied between locations and among years. Shovelnose sturgeon collected during the presumed spawning periods were at varying degrees of readiness to spawn as indicated by oocyte polarization index and blood reproductive hormones. Evaluation of the influence of environmental factors on readiness to spawn using stepwise multiple regression analysis indicated photoperiod followed by temperature were the best candidate variables overall to explain the trend. However, within geographically distinct populations gravid females are not all reproductively synchronized. Assuming that this apparent asynchrony in readiness is normal and not an artifact of the disturbed Missouri River system, we infer that individual sturgeon can persist in a reproductively ready state until conditions appropriate for spawning occur. Taken together, our results lead us to hypothesize that gravid females early in the reproductive cycle (post-vitellogenesis) respond to day length, a reliable annual cue, become increasingly more ready to spawn in response to temperature, and that another set of cues, short-term and specific for localized environmental conditions or events, serve to signal ovulation and release of gametes.

  8. 77 FR 67352 - City of New York; Notice of Application Ready for Environmental Analysis and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-09

    ... accepted and is now ready for environmental analysis. l. Project facilities would include: (1) An existing... 42,281 megawatt-hours of electricity annually. m. A copy of the application is available for review...

  9. 75 FR 35458 - National Drinking Water Advisory Council's Climate Ready Water Utilities Working Group Meeting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-22

    ... supportive environment in which a utility can take steps to be climate ready. In this meeting, the Working... Ready Water Utilities Working Group Meeting Announcement AGENCY: Environmental Protection Agency (EPA... fourth in-person meeting of the Climate Ready Water Utilities (CRWU) Working Group of the National...

  10. Building Community Bonds, Bridges, and Linkages to Promote the Career Readiness of High School Students in the United States

    ERIC Educational Resources Information Center

    Hernandez-Gantes, Victor M.; Keighobadi, Sasha; Fletcher, Edward C., Jr.

    2018-01-01

    The career readiness of high school students has been a longstanding issue that has received renewed attention in recent years. To document an approach to promoting career readiness in the United States, we conducted an exploratory case study of a distinguished information technology career academy. Using the premises of capital building as a…

  11. College Ready--What Can We Learn from First-Year College Assignments? An Examination of Assignments in Iowa Colleges and Universities

    ERIC Educational Resources Information Center

    Donham, Jean

    2014-01-01

    College readiness has several dimensions, but of particular import is readiness to produce scholarly work that meets the expectations of college instructors. Differences from high school and college are well documented in the literature, and this study adds to that body of work by delineating the characteristics of first-year college assignments…

  12. 75 FR 16763 - Ready-to-Learn Television Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-02

    ... official version of this document is the document published in the Federal Register. Free Internet access... Service, toll free, at 1-800-877-8339. Electronic Access to This Document: You can view this document, as... Portable Document Format (PDF) on the Internet at the following site: http://www.ed.gov/news/fedregister...

  13. Evaluating Community Readiness to Implement Environmental and Policy-Based Alcohol Abuse Prevention Strategies in Wisconsin

    ERIC Educational Resources Information Center

    Paltzer, Jason; Black, Penny; Moberg, D. Paul

    2013-01-01

    Background: Matching evidence-based alcohol prevention strat- egies with a community's readiness to support those strategies is the basis for the Tri-Ethnic Community Readiness Model (CRM). The purpose of this evaluation was to assess the association of a community's readiness to address alcohol abuse in their community with the implementation of…

  14. An Exploratory Analysis of Readiness for Environmental Education.

    ERIC Educational Resources Information Center

    Harmon, N. Paul; And Others

    Contained in this monograph is a review and synthesis of developmental psychology and learning theory, with major emphasis upon applications of the developmental perspective to environmental education curriculum and instruction. Based upon a summary of the work of Piaget and his followers, a learning readiness axis is proposed. Also examined are…

  15. U.S. Department of Energy Zero Energy Ready Home Implementation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    VonThoma, E.; Mosiman, G.

    This report documents the process and outcomes involved in achieving the U.S. Department of Energy Zero Energy Ready Home (ZERH) program certification standards while helping homebuilders in Climate Zones 5 and 6 in the Upper Midwest achieve ZERH certification.

  16. WIPP Remote-Handled TRU Waste Program Update

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Most, W.; Kehrman, B.

    2006-07-01

    There are two major regulatory approval milestones necessary in order to commence disposal operations for remote-handled transuranic (RH TRU) waste at the Waste Isolation Pilot Plant (WIPP)-the RH TRU hazardous waste permit modification request [1] and the radiological characterization plan [2]. One of those milestones has been achieved. The US Environmental Protection Agency (EPA) issued its final decision to approve the Department of Energy's (DOE) RH TRU radiological characterization plan along with the RH TRU Waste Characterization Program Implementation Plan [3], on March 26, 2004. The RH TRU hazardous waste permit modification request still awaits agency approval. In EPA's decisionmore » to approve the DOE's RH TRU radiological characterization plan, the EPA also set forth the process for approving site-specific RH TRU waste characterization programs. Included in the March 29, 2005, RH TRU second Notice of Deficiency [4] (NOD) on the Class 3 Permit Modification Request for RH TRU Waste, the New Mexico Environment Department (NMED) requested that the Permittees combine their responses for the RH TRU Waste NOD with the Section 311 permit modification request NOD. The Combined Response Document was submitted April 28, 2005 [5]. Another NOD [6] was issued by the NMED on September 1, 2005, to clarify the Permittees' proposal and submit these clarifications to the administrative record. Combining both the chap. 311 [7] and RH TRU waste permit modification requests allows for both the regulator and Permittees to expedite action on the modification requests. The Combined Response Document preserves human resources and costs by having only one administrative process for both modification requests. Facility readiness requirements of the RH TRU waste final permit [8] must be implemented to declare that the WIPP is ready to receive RH TRU waste for storage and disposal. To demonstrate readiness, the WIPP is preparing for an Operational Readiness Review (ORR) of the RH TRU waste management equipment, system, and procedures. Required by DOE Order, the ORR demonstrates the capability of managing RH TRU waste. The Management and Operating Contractor (MOC) for the WIPP must first perform a Line Management Assessment. Upon successful completion of the Line Management Assessment, the MOC performs the Contractor ORR and presents the results to the local DOE office. At that time, the local DOE office performs its own ORR to declare readiness to DOE Headquarters. (authors)« less

  17. Readiness of hospitals to provide Kangaroo Mother Care (KMC) and documentation of KMC service delivery: Analysis of Malawi 2014 Emergency Obstetric and Newborn Care (EmONC) survey data.

    PubMed

    Chavula, Kondwani; Likomwa, Dyson; Valsangkar, Bina; Luhanga, Richard; Chimtembo, Lydia; Dube, Queen; Gobezie, Wasihun Andualem; Guenther, Tanya

    2017-12-01

    Malawi introduced Kangaroo Mother Care (KMC) in 1999 as part of its efforts to address newborn morbidity and mortality and has continued to expand KMC services across the country. Yet, data on availability of KMC services and routine service provision are limited. Data from the 2014 Emergency Obstetric Newborn Care (EmONC) survey, which was a census of all 87 hospitals in Malawi, were analyzed. The WHO service availability and readiness domains were used to generate indicators for KMC service readiness and an additional domain for documentation of KMC services was included. Levels of KMC service delivery were quantified using data extracted from a 12-month register review and a KMC initiation rate was calculated for each facility by dividing the reported number of babies initiated on KMC by the number of live births at facility. We defined three levels of KMC readiness and two levels of KMC operational status. 79% of hospitals (69/87) reported providing inpatient KMC services. More than half of the hospitals (62%; 54/87) met the most basic definition of readiness (staff, space for KMC and functional weighing scale) and 35% (30/87) met an expanded definition of readiness (guidelines, staff, space, scale and register in use). Only 15 % (13/87) of hospitals had all KMC tracer items. Less than half of the hospitals (43%; 37/87) met criteria for KMC operational status at minimum levels (≥1/100 live births), and just 16% (14/87) met criteria for KMC operational status at routine levels (≥5/100 live births). Our study found large differences between reported levels of KMC services and documented levels of KMC readiness and service provision among hospitals in Malawi. It is recommended that facility assessments of services such as KMC include record reviews to better estimate service availability and delivery. Further efforts to strengthen the capacity of Malawian hospitals to deliver KMC are needed.

  18. Interface Management for a NASA Flight Project Using Model-Based Systems Engineering (MBSE)

    NASA Technical Reports Server (NTRS)

    Vipavetz, Kevin; Shull, Thomas A.; Infeld, Samatha; Price, Jim

    2016-01-01

    The goal of interface management is to identify, define, control, and verify interfaces; ensure compatibility; provide an efficient system development; be on time and within budget; while meeting stakeholder requirements. This paper will present a successful seven-step approach to interface management used in several NASA flight projects. The seven-step approach using Model Based Systems Engineering will be illustrated by interface examples from the Materials International Space Station Experiment-X (MISSE-X) project. The MISSE-X was being developed as an International Space Station (ISS) external platform for space environmental studies, designed to advance the technology readiness of materials and devices critical for future space exploration. Emphasis will be given to best practices covering key areas such as interface definition, writing good interface requirements, utilizing interface working groups, developing and controlling interface documents, handling interface agreements, the use of shadow documents, the importance of interface requirement ownership, interface verification, and product transition.

  19. Operational readiness review phase-1 final report for WRAP-1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bowen, W., Westinghouse Hanford

    1996-12-27

    This report documents the Operational Readiness Review for WRAP-1 Phase-1 operations. The report includes all criteria, lines of inquiry with resulting Findings and Observations. The review included assessing operational capability of the organization and the computer controlled process and facility systems.

  20. Length of stay after vaginal birth: sociodemographic and readiness-for-discharge factors.

    PubMed

    Weiss, Marianne; Ryan, Polly; Lokken, Lisa; Nelson, Magdalen

    2004-06-01

    The impact of reductions in postpartum length of stay have been widely reported, but factors influencing length of hospital stay after vaginal birth have received less attention. The study purpose was to compare the sociodemographic characteristics and readiness for discharge of new mothers and their newborns at 3 discharge time intervals, and to determine which variables were associated with postpartum length of stay. The study sample comprised 1,192 mothers who were discharged within 2 postpartum days after uncomplicated vaginal birth at a tertiary perinatal center in the midwestern United States. The sample was divided into 3 postpartum length-of-stay groups: group 1 (18-30 hr), group 2 (31-42 hr), and group 3 (43-54 hr). Sociodemographic and readiness-for-discharge data were collected by self-report and from a computerized hospital information system. Measures of readiness for discharge included perceived readiness (single item and Readiness for Discharge After Birth Scale), documented maternal and neonatal clinical problems, and feeding method. Compared with other groups, the longest length-of-stay group was older; of higher socioeconomic status and education; and with more primiparous, breastfeeding, white, married mothers who were living with the baby's father, had adequate home help, and had a private payor source. This group also reported greater readiness for discharge, but their newborns had more documented clinical problems during the postbirth hospitalization. In logistic regression modeling, earlier discharge was associated with young age, multiparity, public payor source, low socioeconomic status, lack of readiness for discharge, bottle-feeding, and absence of a neonatal clinical problem. Sociodemographic characteristics and readiness for discharge (clinical and perceived) were associated with length of postpartum hospital stay. Length of stay is an outcome of a complex interface between patient, provider, and payor influences on discharge timing that requires additional study. Including perceived readiness for discharge in clinical discharge criteria will add an important dimension to assessment of readiness for discharge after birth.

  1. 75 FR 68321 - Forage Genetics International; Supplemental Request for Partial Deregulation of Roundup Ready...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-05

    ...] Forage Genetics International; Supplemental Request for Partial Deregulation of Roundup Ready Alfalfa... Inspection Service has received a supplemental request for ``partial deregulation'' from Forage Genetics... affected persons of the availability of the documents submitted to the Agency from Forage Genetics...

  2. 75 FR 28594 - Ready-to-Learn Television Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-21

    ... Federal Register. Free Internet access to the official edition of the Federal Register and the Code of... Access to This Document: You can view this document, as well as all other documents of this Department published in the Federal Register, in text or Adobe Portable Document Format (PDF) on the Internet at the...

  3. 75 FR 18170 - Ready-to-Learn Television Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-09

    ... official version of this document is the document published in the Federal Register. Free Internet access... Federal Relay Service, toll free, at 1-800-877-8339. Electronic Access to This Document: You can view this... Adobe Portable Document Format (PDF) on the Internet at the following site: http://www.ed.gov/news...

  4. 40 CFR 406.90 - Applicability; description of the ready-to-eat cereal subcategory.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...-to-eat cereal subcategory. 406.90 Section 406.90 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS GRAIN MILLS POINT SOURCE CATEGORY Ready-to-Eat Cereal Subcategory § 406.90 Applicability; description of the ready-to-eat cereal subcategory. The...

  5. 78 FR 12304 - Lock+ Hydro Friends Fund XLII, LLC; Notice of Application Ready for Environmental Analysis and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-22

    ... Friends Fund XLII, LLC; Notice of Application Ready for Environmental Analysis and Soliciting Comments...+ Hydro Friends Fund XLII, LLC. e. Name of Project: Braddock Locks and Dam Hydroelectric Project. f...\\ Hydro Friends Fund XLII, LLC, c/o Hydro Green Energy, LLC, 900 Oakmont Lane, Suite 310, Westmont, IL...

  6. Libraries at the Ready

    ERIC Educational Resources Information Center

    Celano, Donna C.; Neuman, Susan B.

    2016-01-01

    Because English language learners enter kindergarten at a distinct disadvantage, Celano and Neuman examine the role public libraries can play in rallying around these young children to better prepare them for school. The authors document a new program called Every Child Ready to Read, which recently launched in 4,000 public libraries across the…

  7. 78 FR 15009 - Extension of Deadline; Gaining Early Awareness and Readiness for Undergraduate Programs (GEAR UP...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-08

    ... official version of this document is the document published in the Federal Register. Free Internet access... free, at 1- 800-877-8339. Accessible Format: Individuals with disabilities can obtain this document in... Document Format (PDF). To use PDF, you must have Adobe Acrobat Reader, which is available free at this site...

  8. 75 FR 1380 - National Drinking Water Advisory Council's Climate Ready Water Utilities Working Group Meeting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-11

    ... Ready Water Utilities Working Group Meeting Announcement AGENCY: Environmental Protection Agency. ACTION... meeting of the Climate Ready Water Utilities (CRWU) Working Group of the National Drinking Water Advisory Council (NDWAC). The purpose of this meeting is for the Working Group to discuss the attributes and...

  9. 75 FR 20352 - National Drinking Water Advisory Council's Climate Ready Water Utilities Working Group Meeting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-19

    ... Ready Water Utilities Working Group Meeting Announcement AGENCY: Environmental Protection Agency. ACTION...-person meeting of the Climate Ready Water Utilities (CRWU) Working Group of the National Drinking Water Advisory Council (NDWAC). The purpose of this meeting is for the Working Group to discuss key findings, the...

  10. Naval Readiness, Operational Training, and Environmental Protection: Achieving an Appropriate Balance between Competing National Interests

    DTIC Science & Technology

    1988-06-01

    Readiness: Operational Traininz; Polution 19 ABSTRACT (Continue on reverse if necessary and identify by block number) This paper describes the...201 - Organization and Manning Levels . ...... 202 - Land Use Management Plans .. ......... 204 - Environmental Audits ...legislative agency whose purpose is to audit other gcvernment agencies. Based upon those audits , the Comptroller General makes reports to Congress to

  11. Vulnerability Assessments in Support of the Climate Ready Estuaries Program: A Novel Approach Using Expert Judgement, Volume II: Results for the Massachusetts Bays Program (External Review Draft)

    EPA Science Inventory

    As part of the Climate Ready Estuaries (CRE) program, the Global Change Research Program (GCRP) in the National Center for Environmental Assessment, Office of Research and Development at the U.S. Environmental Protection Agency has prepared a report exploring a new methodology fo...

  12. 18 CFR 5.22 - Notice of acceptance and ready for environmental analysis.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Notice of acceptance and ready for environmental analysis. 5.22 Section 5.22 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT INTEGRATED LICENSE APPLICATION PROCESS § 5.22 Notice o...

  13. Vulnerability Assessments in Support of the Climate Ready ...

    EPA Pesticide Factsheets

    As part of the Climate Ready Estuaries (CRE) program, the Global Change Research Program (GCRP) in the National Center for Environmental Assessment, Office of Research and Development at the U.S. Environmental Protection Agency has prepared this draft report exploring a new methodology for climate change vulnerability assessments using San Francisco Bay’s salt marsh and mudflat ecosystems as a demonstration. N/A

  14. Vulnerability Assessments in Support of the Climate Ready Estuaries Program: A Novel Approach Using Expert Judgment, Volume I: Results for the San Francisco Estuary Partnership (External Review Draft)

    EPA Science Inventory

    As part of the Climate Ready Estuaries (CRE) program, the Global Change Research Program (GCRP) in the National Center for Environmental Assessment, Office of Research and Development at the U.S. Environmental Protection Agency has prepared this draft report exploring a new metho...

  15. Vulnerability Assessments in Support of the Climate Ready Estuaries Program: A Novel Approach Using Expert Judgement, Volume II: Results for the Massachusetts Bays Program (Final Report)

    EPA Science Inventory

    As part of the Climate Ready Estuaries (CRE) program, the Global Change Research Program (GCRP) in the National Center for Environmental Assessment, Office of Research and Development at the U.S. Environmental Protection Agency has prepared a report exploring a new methodology fo...

  16. Vulnerability Assessments in Support of the Climate Ready Estuaries Program: A Novel Approach Using Expert Judgment, Volume I: Results for the San Francisco Estuary Partnership (Final Report)

    EPA Science Inventory

    As part of the Climate Ready Estuaries (CRE) program, the Global Change Research Program (GCRP) in the National Center for Environmental Assessment, Office of Research and Development at the U.S. Environmental Protection Agency has prepared this draft report exploring a new metho...

  17. A Study of Students' Readiness to Learn Calculus

    ERIC Educational Resources Information Center

    Carlson, Marilyn P.; Madison, Bernard; West, Richard D.

    2015-01-01

    The Calculus Concept Readiness (CCR) instrument assesses foundational understandings and reasoning abilities that have been documented to be essential for learning calculus. The CCR Taxonomy describes the understandings and reasoning abilities assessed by CCR. The CCR is a 25-item multiple-choice instrument that can be used as a placement test for…

  18. Determining College Readiness in California's Community Colleges: A Survey of Assessment and Placement Policies. Technical Appendices

    ERIC Educational Resources Information Center

    Rodriguez, Olga; Cuellar-Mejia, Marisol; Johnson, Hans

    2016-01-01

    This document presents the technical appendices that accompany the full report, "Determining College Readiness in California's Community Colleges: A Survey of Assessment and Placement Policies." The appendices include: (1) Survey Design and Administration; and (2) Survey Instrument. [This report was written with research support from…

  19. Health Disparities and Gaps in School Readiness

    ERIC Educational Resources Information Center

    Currie, Janet

    2005-01-01

    The author documents pervasive racial disparities in the health of American children and analyzes how and how much those disparities contribute to racial gaps in school readiness. She explores a broad sample of health problems common to U.S. children, such as attention deficit hyperactivity disorder, asthma, and lead poisoning, as well as maternal…

  20. Realizing the College Dream: A Guide to College Readiness

    ERIC Educational Resources Information Center

    Harley-Permenter, Kisa L.

    2017-01-01

    Evidence is documented in research that too many students, particularly low-income and minority students, leave the kindergarten to Grade 12 educational system without the knowledge and the skills necessary for success after high school. The primary goal of this study was to examine in greater depth the factors that influence college readiness.…

  1. Future Ready Learning: Reimagining the Role of Technology in Education. 2016 National Education Technology Plan

    ERIC Educational Resources Information Center

    Thomas, Susan

    2016-01-01

    The National Education Technology Plan is the flagship educational technology policy document for the United States. The 2016 Plan, "Future Ready Learning: Reimagining the Role of Technology in Education," articulates a vision of equity, active use, and collaborative leadership to make everywhere, all-the-time learning possible. While…

  2. The Readiness of Schools in Zimbabwe for the Implementation of Early Childhood Education

    ERIC Educational Resources Information Center

    Mangwaya, Ezron; Blignaut, Sylvan; Pillay, Shervani K.

    2016-01-01

    This qualitative study focuses on primary schools' state of readiness for the introduction of early childhood education. Adopting a multiple case study design, the article explores, through semi-structured interviews and documentation, school heads, teachers-in-charge and classroom teachers' perceptions of their respective schools' state of…

  3. 78 FR 4151 - Medicare Program; Request for Information on Hospital and Vendor Readiness for Electronic Health...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-18

    ...) Program using the Quality Reporting Document Architecture (QRDA) Category I. The comment period for the... Reporting (IQR) Program using the Quality Reporting Document Architecture (QRDA) Category I beginning with...

  4. Readiness of hospitals to provide Kangaroo Mother Care (KMC) and documentation of KMC service delivery: Analysis of Malawi 2014 Emergency Obstetric and Newborn Care (EmONC) survey data

    PubMed Central

    Chavula, Kondwani; Likomwa, Dyson; Valsangkar, Bina; Luhanga, Richard; Chimtembo, Lydia; Dube, Queen; Gobezie, Wasihun Andualem; Guenther, Tanya

    2017-01-01

    Background Malawi introduced Kangaroo Mother Care (KMC) in 1999 as part of its efforts to address newborn morbidity and mortality and has continued to expand KMC services across the country. Yet, data on availability of KMC services and routine service provision are limited. Methods Data from the 2014 Emergency Obstetric Newborn Care (EmONC) survey, which was a census of all 87 hospitals in Malawi, were analyzed. The WHO service availability and readiness domains were used to generate indicators for KMC service readiness and an additional domain for documentation of KMC services was included. Levels of KMC service delivery were quantified using data extracted from a 12–month register review and a KMC initiation rate was calculated for each facility by dividing the reported number of babies initiated on KMC by the number of live births at facility. We defined three levels of KMC readiness and two levels of KMC operational status. Results 79% of hospitals (69/87) reported providing inpatient KMC services. More than half of the hospitals (62%; 54/87) met the most basic definition of readiness (staff, space for KMC and functional weighing scale) and 35% (30/87) met an expanded definition of readiness (guidelines, staff, space, scale and register in use). Only 15% (13/87) of hospitals had all KMC tracer items. Less than half of the hospitals (43%; 37/87) met criteria for KMC operational status at minimum levels (≥1/100 live births), and just 16% (14/87) met criteria for KMC operational status at routine levels (≥5/100 live births). Conclusions Our study found large differences between reported levels of KMC services and documented levels of KMC readiness and service provision among hospitals in Malawi. It is recommended that facility assessments of services such as KMC include record reviews to better estimate service availability and delivery. Further efforts to strengthen the capacity of Malawian hospitals to deliver KMC are needed. PMID:29085623

  5. Practical Tips for Establishing Partnerships With Academic Researchers: A Resource Guide for Community-Based Organizations.

    PubMed

    Darling, Margaret; Gonzalez, Florencia; Graves, Kristi; Sheppard, Vanessa B; Hurtado-de-Mendoza, Alejandra; Leventhal, Kara-Grace; Caicedo, Larisa

    2015-01-01

    Research exists on strategies for successful conduct of community-based participatory research (CBPR). Unfortunately, few published resources are available to advise community-based organizations (CBOs) on preparation for and engagement in CBPR. We aimed to create a resource for CBOs that describes how an organization can prepare for and participate in CBPR. We used a case study approach of one CBO with a decade-long history of collaboration with academic researchers. We identified lessons learned through a retrospective review of organizational records and the documentation of experiences by CBO leadership and research partners. The findings were then labeled according to CBPR Partnership Readiness Model dimensions. The review of CBO documents and key informant interviews yielded ten practical tips to increase organizational readiness for and engagement in CBPR. By understanding the best practices for organizational readiness for and participation in CPBR, CBOs will be better equipped to actively participate in community-academic partnerships.

  6. Focus on Mentee-Mentor Relationships: The 10th Grade Implementation of iMentor's College Ready Program. Technical Appendices

    ERIC Educational Resources Information Center

    Merrill, Lisa; Kang, David; Siman, Nina; Soltani, Jasmine

    2016-01-01

    This document presents the technical appendices that accompany the full report entitled:"Focus on Mentee-Mentor Relationships: The 10th Grade Implementation of iMentor's College Ready Program." The appendices include: (1) Mentor Survey Construct Items; (2) Qualative Data Collection and Analysis Methods; and (3) Methods for Estimating the…

  7. English Learners (ELs) and College and Career Readiness. Fast Facts

    ERIC Educational Resources Information Center

    Office of English Language Acquisition, US Department of Education, 2015

    2015-01-01

    The Office of English Language Acquisition (OELA) has synthesized key data on English learners (ELs) into two-page PDF sheets, by topic, with graphics, plus key contacts. This document presents highlights relating to English learners and college and career readiness covering school-year (SY) 2011-2012. The topics for this report include: (1)…

  8. 3 CFR - Delegation of Authority To Appoint Commissioned Officers of the Ready Reserve Corps of the Public...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Officers of the Ready Reserve Corps of the Public Health Service Presidential Documents Other Presidential...Reserve Corps of the Public Health Service Memorandum for the Secretary of Health and Human Services By... under section 203 of the Public Health Service Act, as amended by Public Law 111-148, to appoint...

  9. Child and environmental risk factors predicting readiness for learning in children at high risk of dyslexia.

    PubMed

    Dilnot, Julia; Hamilton, Lorna; Maughan, Barbara; Snowling, Margaret J

    2017-02-01

    We investigate the role of distal, proximal, and child risk factors as predictors of reading readiness and attention and behavior in children at risk of dyslexia. The parents of a longitudinal sample of 251 preschool children, including children at family risk of dyslexia and children with preschool language difficulties, provided measures of socioeconomic status, home literacy environment, family stresses, and child health via interviews and questionnaires. Assessments of children's reading-related skills, behavior, and attention were used to define their readiness for learning at school entry. Children at family risk of dyslexia and children with preschool language difficulties experienced more environmental adversities and health risks than controls. The risks associated with family risk of dyslexia and with language status were additive. Both home literacy environment and child health predicted reading readiness while home literacy environment and family stresses predicted attention and behavior. Family risk of dyslexia did not predict readiness to learn once other risks were controlled and so seems likely to be best conceptualized as representing gene-environment correlations. Pooling across risks defined a cumulative risk index, which was a significant predictor of reading readiness and, together with nonverbal ability, accounted for 31% of the variance between children.

  10. Final Report: Contractor Readiness Assessment (CRA) for TREAT Fuel Movement and Control Rod Drives Isolation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rowsell, David Leon

    This report documents the Contractor Readiness Assessment (CRA) for TREAT Fuel Movement and Control Rod Drives Isolation. The review followed the approved Plan of Action (POA) and Implementation Plan (IP) using the identified core requirements. The activity was limited scope focusing on the control rod drives functional isolation and fuel element movement. The purpose of this review is to ensure the facility's readiness to move fuel elements thus supporting inspection and functionally isolate the control rod drives to maintain the required shutdown margin.

  11. Detection, Classification, and Density Estimation of Marine Mammals

    DTIC Science & Technology

    2012-10-01

    Energy and Environmental Readiness Division, Washington, D.C. DETECTION...was prepared for and funded by Chief of Naval Operations, Energy and Environmental Readiness Division, Washington DC. The report was prepared by...and classification, including improvements to the  Energy  Ratio Mapping Algorithm (ERMA) method for use on gliders and  its  extension  to  new

  12. STS-26 Discovery, OV-103, OASIS equipment is mounted in payload bay (PLB)

    NASA Image and Video Library

    1988-04-18

    S88-37764 (18 April 1988) --- OASIS, instrumentation which will record the environment experienced by Discovery during the STS-26 Space Shuttle mission, is lowered into position for attachment to the orbiter's aft port sill. Instrumentation sensors in the payload bay which are connected to the tape recorder module will document a variety of environmental measurements during various phases of the flight including temperature, pressure, vibration, sounds, acceleration, stress, and strain. OASIS will also record data during the Flight Readiness Firing. NASA is flying OASIS aboard Discovery in support of the Inertial Upper Stage (IUS) program office of the Air Force Space Division. The system was developed by Lockheed under a NASA contract, funded by the Air Force.

  13. Are ready-to-eat salads ready to eat? An outbreak of Salmonella Coeln linked to imported, mixed, pre-washed and bagged salad, Norway, November 2013.

    PubMed

    Vestrheim, D F; Lange, H; Nygård, K; Borgen, K; Wester, A L; Kvarme, M L; Vold, L

    2016-06-01

    We investigated a nationwide outbreak of Salmonella Coeln in Norway, including 26 cases identified between 20 October 2013 and 4 January 2014. We performed a matched case-control study, environmental investigation and detailed traceback of food purchases to identify the source of the outbreak. In the case-control study, cases were found to be more likely than controls to have consumed a ready-to-eat salad mix (matched odds ratio 20, 95% confidence interval 2·7-∞). By traceback of purchases one brand of ready-to-eat salad was indicated, but all environmental samples were negative for Salmonella. This outbreak underlines that pre-washed and bagged salads carry a risk of infection despite thorough cleaning procedures by the importer. To further reduce the risk of infection by consumption of ready-to-eat salads product quality should be ensured by importers. Outbreaks linked to salads reinforce the importance of implementation of appropriate food safety management systems, including good practices in lettuce production.

  14. Space Power Facility Readiness for Space Station Power System Testing

    NASA Technical Reports Server (NTRS)

    Smith, Roger L.

    1995-01-01

    This document provides information which shows that the NASA Lewis Research Center's Space Power Facility (SPF) will be ready to execute the Space Station electric power system thermal vacuum chamber testing. The SPF is located at LeRC West (formerly the Plum Brook Station), Sandusky, Ohio. The SPF is the largest space environmental chamber in the world, having an inside horizontal diameter of 100 ft. and an inside height at the top of the hemisphere of 122 ft. The vacuum system can achieve a pressure lower than 1 x 10(exp -5) Torr. The cryoshroud, cooled by gaseous nitrogen, can reach a temperature of -250 F, and is 80 ft. long x 40 ft. wide x 22 ft. high. There is access to the chamber through two 50 ft. x 50 ft. doors. Each door opens into an assembly area about 150 ft. long x 70 ft. wide x 80 ft. high. Other available facilities are offices, shop area, data acquisition system with 930 pairs of hard lines, 7 megawatts of power to chamber, 245K gal. liquid nitrogen storage, cooling tower, natural gas, service air, and cranes up to 25 tons.

  15. Environmental readiness pilot study at the Badger Army Ammunition Plant, Baraboo, Wisconsin

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mays, D.; Bhinge, D.; Patel, J.

    1994-12-31

    The Badger Army Ammunition Plant (BAAP) has been on standby status since the mid-1970s, prior to the enactment of the majority of Federal environmental regulations. As a result, BAAP is unprepared to begin production without the implementation of pollution prevention and treatment measures. The Army contracted SAIC to conduct a pilot study to develop an environmental readiness plan for BAAP in the event that the plant is reactivated to produce explosives and propellants for ammunition requirements during mobilization. This paper describes the process developed by SAIC to conduct this pilot study at BAAP and the relationship between this effort andmore » the Army`s overall environmental mission.« less

  16. An outbreak of an unusual strain of Listeria monocytogenes infection in North-East Scotland.

    PubMed

    Okpo, Emmanuel; Leith, Jayne; Smith-Palmer, Alison; Bell, John; Parks, Duncan; Browning, Fiona; Byers, Lynn; Corrigan, Helen; Webster, Diana; Karcher, Anne M; Murray, Andrew; Storey, Tom

    2015-01-01

    Listeria monocytogenes infection is an important cause of illness and hospitalization in vulnerable individuals. In the present study, we describe a community outbreak of Listeria monocytogenes in the North-East region of Scotland, which was epidemiologically, environmentally and microbiologically linked to a local meat product and ready-to-eat product manufacturer. Infected individuals were interviewed, and an environmental investigation was conducted. Clinical and environmental samples were tested by culture, and isolates were typed by fluorescent amplified fragment length polymorphism (fAFLP). Three cases of Listeria monocytogenes were linked geographically, had the same serotype (1/2a) and were indistinguishable by fAFLP type XII.6. The human, food and environmental isolates were of the same serotype and were indistinguishable by molecular typing. This is the first community outbreak of L. monocytogenes reported in Scotland since the current outbreak surveillance was established in 1996. Epidemiological and laboratory evidence indicated poor hand hygiene, unhygienic practices and cross-contamination throughout the manufacturing process of ready-to-eat foods as a possible cause of the outbreak. More stringent control of commercial food establishments that provide ready-to-eat food and the need to advise specifically vulnerable groups, e.g., pregnant women, of the risk of L. monocytogenes in ready-to-eat food is urgently needed. Copyright © 2015 King Saud Bin Abdulaziz University for Health Sciences. Published by Elsevier Ltd. All rights reserved.

  17. Idaho National Laboratory Emergency Readiness Assurance Plan - Fiscal Year 2015

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Farmer, Carl J.

    Department of Energy Order 151.1C, Comprehensive Emergency Management System requires that each Department of Energy field element documents readiness assurance activities, addressing emergency response planning and preparedness. Battelle Energy Alliance, LLC, as prime contractor at the Idaho National Laboratory (INL), has compiled this Emergency Readiness Assurance Plan to provide this assurance to the Department of Energy Idaho Operations Office. Stated emergency capabilities at the INL are sufficient to implement emergency plans. Summary tables augment descriptive paragraphs to provide easy access to data. Additionally, the plan furnishes budgeting, personnel, and planning forecasts for the next 5 years.

  18. Readiness Review of BWXT for Fabrication of AGR-5/6/7 TRISO Particles

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Marshall, Douglas William; Sharp, Michelle Tracy

    2016-02-01

    INL readiness review assessment of BWXT readiness to commence fabrication of low-enriched TRISO coated fuel particles for the AGR-5/6/7 irradiation experiments. BWXT self-identified equipment issues preventing operation. INL identified two findings. The first was that disposition codes had not been assigned and documented on BWXT forms to ensure that off-specification materials could not be used in the fabrication of TRISO particles. The second was that chemical purity specifications were not reliably passed on to chemical suppliers, which resulted in the receipt of one acetylene cylinder with suspect impurity levels.

  19. Redrilling Plan for EE-3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Murphy, Hugh D.

    1984-11-14

    Attached is the 3rd draft copy of the EE-3 redrilling plan. We believe that we have taken the document as far as we can and feel that it is ready for distribution as soon as the trajectory question is resolved and necessary changes in wording that result are made. The figures are presently being redrawn by John Paskiewicz and should be ready in about one week.

  20. The Readiness Agenda: Texas Aligns High School, Entry-Level College Standards

    ERIC Educational Resources Information Center

    Gewertz, Catherine

    2009-01-01

    A lot of hope is riding on a little document in the big state of Texas. Educators and policymakers who have long agonized over how the Lone Star State's low college-going rate and its high remediation rate are charting a course they hope will lead to better outcomes. This article discusses the Texas College and Career Readiness Standards as a key…

  1. Buying Ready Mades--Wardrobe Plan. Teacher's Guide and Student Materials [and] Buying Ready Mades--Purchasing.

    ERIC Educational Resources Information Center

    Noyes, Joan

    This document provides teaching guidelines, objectives, and student activities for a two-part unit intended for use in junior high and high school consumer and/or home economics programs. Each part of the unit requires from four to six hours of classroom time. The first part focuses on planning a wardrobe. Objectives are to help students evaluate…

  2. DOD Financial Management: Improved Documentation Needed to Support the Air Force’s Military Payroll and Meet Audit Readiness Goals

    DTIC Science & Technology

    2015-12-01

    balances to match Treasury balances. 19The financial reporting system collects and consolidates information for financial statement presentation...2The financial reporting system collects and consolidates information for financial statement presentation. 3Subsistence...efforts to achieve auditability of its financial statements , the Air Force in July 2014 asserted audit readiness for its Schedule of Budgetary

  3. Inherent Controls on Ready Mix Cement Silos

    EPA Pesticide Factsheets

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  4. 77 FR 17038 - Notice of Intent To Prepare an Environmental Impact Statement/Overseas Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-23

    ... DEPARTMENT OF DEFENSE Department of the Navy Notice of Intent To Prepare an Environmental Impact Statement/ Overseas Environmental Impact Statement for Military Readiness Activities in the Northwest... development of an Environmental Impact Statement/Overseas Environmental Impact Statement for the Northwest...

  5. openECA Detailed Design Document

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robertson, Russell

    This document describes the functional and non-functional requirements for: The openECA platform The included analytic systems that will: Validate the operational readiness and performance of the openECA platform Provide out-of-box value to those that implement the openECA platform with an initial collection of analytics

  6. Technical Readiness and Gaps Analysis of Commercial Optical Materials and Measurement Systems for Advanced Small Modular Reactors

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Anheier, Norman C.; Suter, Jonathan D.; Qiao, Hong

    2013-08-06

    This report intends to support Department of Energy’s Office of Nuclear Energy (DOE-NE) Nuclear Energy Research and Development Roadmap and industry stakeholders by evaluating optical-based instrumentation and control (I&C) concepts for advanced small modular reactor (AdvSMR) applications. These advanced designs will require innovative thinking in terms of engineering approaches, materials integration, and I&C concepts to realize their eventual viability and deployability. The primary goals of this report include: 1. Establish preliminary I&C needs, performance requirements, and possible gaps for AdvSMR designs based on best available published design data. 2. Document commercial off-the-shelf (COTS) optical sensors, components, and materials in termsmore » of their technical readiness to support essential AdvSMR in-vessel I&C systems. 3. Identify technology gaps by comparing the in-vessel monitoring requirements and environmental constraints to COTS optical sensor and materials performance specifications. 4. Outline a future research, development, and demonstration (RD&D) program plan that addresses these gaps and develops optical-based I&C systems that enhance the viability of future AdvSMR designs. The development of clean, affordable, safe, and proliferation-resistant nuclear power is a key goal that is documented in the Nuclear Energy Research and Development Roadmap. This roadmap outlines RD&D activities intended to overcome technical, economic, and other barriers, which currently limit advances in nuclear energy. These activities will ensure that nuclear energy remains a viable component to this nation’s energy security.« less

  7. Defense Occupational and Environmental Health Readiness System (DOEHRS) Guidance

    DTIC Science & Technology

    2009-07-01

    TERMS Defense Occupational and Environmental Health Reporting System (DOEHRS), Industrial Hygiene, Environmental Health, Information Management System Hygiene...Information System (AF EMIS), the Air Force Enterprise Environmental, Safety, and Occupational Health Information Management System (EESOH MIS), or the

  8. Technology and Manufacturing Readiness of Early Market Motive and Non-Motive Hydrogen Storage Technologies for Fuel Cell Applications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ronnebro, Ewa

    PNNL’s objective in this report is to provide DOE with a technology and manufacturing readiness assessment to identify hydrogen storage technologies’ maturity levels for early market motive and non-motive applications and to provide a path forward toward commercialization. PNNL’s Technology Readiness Assessment (TRA) is based on a combination of Technology Readiness Level (TRL) and Manufacturing Readiness Level (MRL) designations that enable evaluation of hydrogen storage technologies in varying levels of development. This approach provides a logical methodology and roadmap to enable the identification of hydrogen storage technologies, their advantages/disadvantages, gaps and R&D needs on an unbiased and transparent scale thatmore » is easily communicated to interagency partners. The TRA report documents the process used to conduct the TRA, reports the TRL and MRL for each assessed technology and provides recommendations based on the findings.« less

  9. Environmental, Economic, and Scalability Considerations and Trends of Selected Fuel Economy-Enhancing Biomass-Derived Blendstocks

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dunn, Jennifer B.; Biddy, Mary; Jones, Susanne

    Twenty-four biomass-derived compounds and mixtures, identified based on their physical properties, which could be blended into fuels to improve spark ignition engine fuel economy, were assessed for their economic, technology readiness, and environmental viability. These bio-blendstocks were modeled to be produced biochemically, thermochemically, or through hybrid processes. To carry out the assessment, 17 metrics were developed for which each bio-blendstock was determined to be favorable, neutral, or unfavorable. Cellulosic ethanol was included as a reference case. Overall economic and, to some extent, environmental viability is driven by projected yields for each of these processes. The metrics used in this analysismore » methodology highlight the near-term potential to achieve these targeted yield estimates when considering data quality and current technical readiness for these conversion strategies. Key knowledge gaps included the degree of purity needed for use as a bio-blendstock. Less stringent purification requirements for fuels could cut processing costs and environmental impacts. Additionally, more information is needed on the blending behavior of many of these bio-blendstocks with gasoline to support the technology readiness evaluation. Altogether, the technology to produce many of these blendstocks from biomass is emerging, and as it matures, these assessments must be revisited. Importantly, considering economic, environmental, and technology readiness factors, in addition to physical properties of blendstocks that could be used to boost engine efficiency and fuel economy, in the early stages of project research and development can help spotlight those most likely to be viable in the near term.« less

  10. Environmental, Economic, and Scalability Considerations and Trends of Selected Fuel Economy-Enhancing Biomass-Derived Blendstocks

    DOE PAGES

    Dunn, Jennifer B.; Biddy, Mary; Jones, Susanne; ...

    2017-10-30

    Twenty-four biomass-derived compounds and mixtures, identified based on their physical properties, which could be blended into fuels to improve spark ignition engine fuel economy, were assessed for their economic, technology readiness, and environmental viability. These bio-blendstocks were modeled to be produced biochemically, thermochemically, or through hybrid processes. To carry out the assessment, 17 metrics were developed for which each bio-blendstock was determined to be favorable, neutral, or unfavorable. Cellulosic ethanol was included as a reference case. Overall economic and, to some extent, environmental viability is driven by projected yields for each of these processes. The metrics used in this analysismore » methodology highlight the near-term potential to achieve these targeted yield estimates when considering data quality and current technical readiness for these conversion strategies. Key knowledge gaps included the degree of purity needed for use as a bio-blendstock. Less stringent purification requirements for fuels could cut processing costs and environmental impacts. Additionally, more information is needed on the blending behavior of many of these bio-blendstocks with gasoline to support the technology readiness evaluation. Altogether, the technology to produce many of these blendstocks from biomass is emerging, and as it matures, these assessments must be revisited. Importantly, considering economic, environmental, and technology readiness factors, in addition to physical properties of blendstocks that could be used to boost engine efficiency and fuel economy, in the early stages of project research and development can help spotlight those most likely to be viable in the near term.« less

  11. ENVIRONMENTAL TECHNOLOGY VERIFICATION PROGRAM QUARTERLY REPORT - OCTOBER 2003

    EPA Science Inventory

    The U.S. EPA Environmental Technology Verification (ETV) Program provides credible performance data for commercial-ready environmental technologies to speed their implementation for the benefit of vendors, purchasers, permitters, and the public. The ETV Quarterly Reports provide...

  12. No Further Remedial Action Planned Decision Document for Site 3.

    DTIC Science & Technology

    1998-04-01

    INSTALLATION RESTORATION PROGRAM No FURTHER REMEDIAL ACTION PLANNED DECISION DOCUMENT FOR SITE 3 FINAL MICHIGAN AIR NATIONAL GUARD ALPENA ...COMBAT READINESS TRAINING CENTER ALPENA , MICHIGAN April 1998 Air National Guard Andrews AFB, Maryland &nc QUALITY IMSmm«^ 19980519 204 XA REPORT...Document for Site 3 at Alpena CRTC, Alpena , MI. 6. AUTHOR(S) N/A 5. FUNDING NUMBERS 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Montgomery

  13. The Difference That Differences Make: Adolescent Diversity and Its Deregulation.

    ERIC Educational Resources Information Center

    Levine, Melvin D.

    This document discusses the differences in maturity of late adolescents, aged 16 to 21, and how lack of readiness by some adolescents has a major impact upon communities and upon the individual. The document illustrates the tension between individuation and regulation with five vignettes of actual cases. Sources of variation, including biological…

  14. 78 FR 22024 - Twenty First Meeting: RTCA Special Committee 216, Aeronautical Systems Security (Joint Meeting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-12

    ... plenary Joint Plenary [cir] Subgroup status reports [cir] Review schedule and decide on readiness of documents for Final Review and Comment [cir] Identify next steps 3:00 p.m. (1500) Wrap-Up, Adjourn...: Monday, May 13, 2013 Introductions High-level document status Review level of maturity of contributions...

  15. Engaged Institutions: A Commitment to Service. Profiles and Data. Third Working Paper.

    ERIC Educational Resources Information Center

    Kellogg Commission on the Future of State and Land Grant Universities, Washington, DC.

    This document profiles ten higher education institutions across the United States, documenting their roles as "engaged institutions," that is, institutions whose goal it is to produce graduates ready to move along a path of self-directed learning and growth. They are "interactive institutions" that have developed partnerships with civic, business,…

  16. Characterization of Emissions from Open Burning of Meals Ready-to-Eat and their Paperboard Packaging

    EPA Science Inventory

    Emissions from burning current and candidate Meals Ready-to-Eat (MRE) packaging and shipping containers were characterized in an effort to assuage concerns that combustive disposal of waste at forward operating bases could pose an environmental or inhalation threat. Four types of...

  17. Independent Auditors Report on the Attestation of the Existence, Completeness, and Rights of the Armys Real Property

    DTIC Science & Technology

    2015-09-02

    and Audit Readiness Guidance Wave 3 Mission Critical Asset Existence and Completeness Audit. 2 The Army did not assert to the valuation (accuracy) of...identified deficiencies with the universe. The DoD Financial Improvement and Audit Readiness (FIAR) Directorate, in the November 2013 FIAR Guidance ...Working Capital Fund Financial Statements. In our opinion, except for the material deficiencies associated with rights documentation and the universe

  18. ETV - ENVIRONMENTAL TECHNOLOGY VERIFICATION (ETV) - RISK MANAGEMENT

    EPA Science Inventory

    In October 1995, the Environmental Technology Verification (ETV) Program was established by EPA. The goal of ETV is to provide credible performance data for commercial-ready environmental technologies to speed their implementation for the benefit of vendors, purchasers, permitter...

  19. Report on the emergency response to the event on May 14, 1997, at the plutonuim reclamation facility, Hanford Site, Richland,Washington

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shoop, D.S.

    1997-08-20

    On the evening of May 14,1997, a chemical explosion Occurred at the Plutonium Reclamation Facility (PRF) in the 200 West Area(200-W) of the Hanford Site. The event warranted the declaration of an Alert emergency, activation of the Hanford Emergency Response Organization (BRO), and notification of offsite agencies. As a result of the emergency declaration, a subsequent evaluation was conducted to assess: 9 the performance of the emergency response organization o the occupational health response related to emergency activities o event notifications to offsite and environmental agencies. Additionally, the evaluation was designed to: 9 document the chronology of emergency and occupationalmore » health responses and environmental notifications connected with the explosion at the facility 0 assess the adequacy of the Hanford Site emergency preparedness activities; response readiness; and emergency management actions, occupational health, and environmental actions 0 provide an analysis of the causes of the deficiencies and weaknesses in the preparedness and response system that have been identified in the evaluation of the response a assign organizational responsibility to correct deficiencies and weaknesses a improve future performance 0 adjust elements of emergency implementing procedures and emergency preparedness activities.« less

  20. Understanding the Data Complexity continuum to reduce data management costs and increase data usability through partnerships with the National Centers for Environmental Information

    NASA Astrophysics Data System (ADS)

    Mesick, S.; Weathers, K. W.

    2017-12-01

    Data complexity can be seen as a continuum from complex to simple. The term data complexity refers to data collections that are disorganized, poorly documented, and generally do not follow best data management practices. Complex data collections are challenging and expensive to manage. Simplified collections readily support automated archival processes, enhanced discovery and data access, as well as production of services that make data easier to reuse. In this session, NOAA NCEI scientific data stewards will discuss the data complexity continuum. This talk will explore data simplification concepts, methods, and tools that data managers can employ which may offer more control over data management costs and processes, while achieving policy goals for open data access and ready reuse. Topics will include guidance for data managers on best allocation of limited data management resources; models for partnering with NCEI to accomplish shared data management goals; and will demonstrate through case studies the benefits of investing in documentation, accessibility, and services to increase data value and return on investment.

  1. Vulnerability Assessments in Support of the Climate Ready ...

    EPA Pesticide Factsheets

    As part of the Climate Ready Estuaries (CRE) program, the Global Change Research Program (GCRP) in the National Center for Environmental Assessment, Office of Research and Development at the U.S. Environmental Protection Agency has prepared a report exploring a new methodology for climate change vulnerability assessments using Massachusetts Bays’ salt marsh ecosystem as a demonstration. The aim is to synthesize place-based information on the potential implications of climate change for key ecosystem processes in each estuary, in a form that will enable managers to undertake management adaptation planning.

  2. EPA ENVIRONMENTAL TECHNOLOGY EXPERIENCE

    EPA Science Inventory

    THE USEPA's Environmental Technology Verification for Metal Finishing Pollution Prevention Technologies (ETV-MF) Program verifies the performance of innovative, commercial-ready technologies designed to improve industry performance and achieve cost-effective pollution prevention ...

  3. Multiple Representation Document Development

    DTIC Science & Technology

    1987-08-06

    Interleaf Pub- lishing System [6], or FrameMaker [5], formatting is an integral part of document editing. Here, the document is reformatted as it is edited...consider the task of laying out a page of windowed text. In a layout-driven WYSIWYG system like PageMaker [11], Ready-Set-Go! [12], or FrameMaker [5...in MSIWord, FrameMaker , and Tioga are all handled by a noninteractive off-line program. Direct manipulation, from the processing point of view

  4. Microwave Cooking Practices in Minnesota Food Service Establishments.

    PubMed

    Hedeen, Nicole; Reimann, David; Everstine, Karen

    2016-03-01

    Uneven cooking due to consumer use of microwave ovens to cook food products that have been prepared but are not ready to eat has been a documented risk factor in several foodborne disease outbreaks. However, the use of microwave ovens in restaurants and other food service establishments has not been well documented. The aim of this study was to describe the types of food service establishments that use microwave ovens, how these ovens are used, types of foods heated or cooked in these ovens, types of microwave ovens used in food service establishments, and the level of compliance with U.S. Food and Drug Administration (FDA) guidelines. From 2008 to 2009, the Minnesota Department of Health collected data from a convenience sample of 60 food establishments within the state. Facility types included fast-food restaurants, sit-down restaurants, school food service, nursing homes, hotels and motels, and daycare centers. Food preparation practices were classified as prep-serve, cookserve, or complex. Minnesota environmental health specialists administered a study questionnaire to managers during routine inspections. Establishments included in this study reported using microwave ovens primarily to warm commercial ready-to-eat products (67%) and to warm foods for palatability (50%). No minimum temperatures are required for these processes because these foods do not require pathogen destruction. However, food establishments using complex preparation practices more often reported using microwave ovens for multiple processes and for processes that require pathogen destruction. For establishments that did report microwave oven use for food requiring pathogen destruction, the majority of managers reported following most FDA recommendations for cooking and reheating for hot-holding potentially hazardous foods, but many did not report letting food stand for 2 min after cooking. Additional training on stand time after microwave cooking could be beneficial because of low reporting of this practice among study participants.

  5. How to Create a Web-Ready PDF

    EPA Pesticide Factsheets

    Making EPA's PDF documents accessible (by Section 508 standards) and user-friendly includes steps such as adding bookmarks, using electronic conversion rather than scanning pages, and adding metadata.

  6. GOES-R L1b Readiness Implementation and Management Plan

    NASA Technical Reports Server (NTRS)

    Kunkee, David; Farley, Robert; Kwan, Betty; Walterscheid, Richard; Hecht, James; Claudepierre, Seth.; De Luccia, Frank

    2017-01-01

    A complement of Readiness, Implementation and Management Plans (RIMPs) to facilitate management of post-launch product test activities for the official Geostationary Operational Environmental Satellite (GOES-R) Level 1b (L1b) products have been developed and documented. Separate plans have been created for each of the GOES-R sensors including: the Advanced Baseline Imager (ABI), the Extreme ultraviolet and X-ray Irradiance Sensors (EXIS), Geostationary Lightning Mapper (GLM), GOES-R Magnetometer (MAG), the Space Environment In-Situ Suite (SEISS), and the Solar Ultraviolet Imager (SUVI). The GOES-R program has implemented these RIMPs in order to address the full scope of CalVal activities required for a successful demonstration of GOES-R L1b data product quality throughout the three validation stages: Beta, Provisional and Full Validation. For each product maturity level, the RIMPs include specific performance criteria and required artifacts that provide evidence a given validation stage has been reached, the timing when each stage will be complete, a description of every applicable Post-Launch Product Test (PLPT), roles and responsibilities of personnel, upstream dependencies, and analysis methods and tools to be employed during validation. Instrument level Post-Launch Tests (PLTs) are also referenced and apply primarily to functional check-out of the instruments.

  7. Development of Level 1b Calibration and Validation Readiness, Implementation and Management Plans for GOES-R

    NASA Technical Reports Server (NTRS)

    Kunkee, David B.; Farley, Robert W.; Kwan, Betty P.; Hecht, James H.; Walterscheid, Richard L.; Claudepierre, Seth G.; Bishop, Rebecca L.; Gelinas, Lynette J.; Deluccia, Frank J.

    2017-01-01

    A complement of Readiness, Implementation and Management Plans (RIMPs) to facilitate management of post-launch product test activities for the official Geostationary Operational Environmental Satellite (GOES-R) Level 1b (L1b) products have been developed and documented. Separate plans have been created for each of the GOES-R sensors including: the Advanced Baseline Imager (ABI), the Extreme ultraviolet and X-ray Irradiance Sensors (EXIS), Geostationary Lightning Mapper (GLM), GOES-R Magnetometer (MAG), the Space Environment In-Situ Suite (SEISS), and the Solar Ultraviolet Imager (SUVI). The GOES-R program has implemented these RIMPs in order to address the full scope of CalVal activities required for a successful demonstration of GOES-R L1b data product quality throughout the three validation stages: Beta, Provisional and Full Validation. For each product maturity level, the RIMPs include specific performance criteria and required artifacts that provide evidence a given validation stage has been reached, the timing when each stage will be complete, a description of every applicable Post-Launch Product Test (PLPT), roles and responsibilities of personnel, upstream dependencies, and analysis methods and tools to be employed during validation. Instrument level Post-Launch Tests (PLTs) are also referenced and apply primarily to functional check-out of the instruments.

  8. Do Standard Measures of Preschool Quality Used in Statewide Policy Predict School Readiness?

    ERIC Educational Resources Information Center

    Sabol, Terri J.; Pianta, Robert C.

    2014-01-01

    In the majority of states using Quality Rating and Improvement Systems (QRIS) to improve children's school readiness, the Early Childhood Environmental Rating Scale-Revised (ECERS-R) is a core assessment of preschool program quality and is central to QRIS metrics and incentive structures. The present study utilizes nationally representative data…

  9. 75 FR 54871 - National Drinking Water Advisory Council's Climate Ready Water Utilities Working Group Meeting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-09

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9198-8] National Drinking Water Advisory Council's Climate... final in-person meeting of the Climate Ready Water Utilities (CRWU) Working Group of the National Drinking Water Advisory Council (NDWAC). The purpose of this meeting is to review and discuss final changes...

  10. 40 CFR 85.515 - Exemption provisions for intermediate age vehicles/engines.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... age vehicles/engines. 85.515 Section 85.515 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...-ready status using an OBD scan tool appropriate for the OBD system in the vehicle/engine in question... have reset to a ready status, you must submit an OBD scan tool report showing that with the vehicle...

  11. 40 CFR 85.515 - Exemption provisions for intermediate age vehicles/engines.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... age vehicles/engines. 85.515 Section 85.515 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...-ready status using an OBD scan tool appropriate for the OBD system in the vehicle/engine in question... have reset to a ready status, you must submit an OBD scan tool report showing that with the vehicle...

  12. 40 CFR 85.515 - Exemption provisions for intermediate age vehicles/engines.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... age vehicles/engines. 85.515 Section 85.515 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...-ready status using an OBD scan tool appropriate for the OBD system in the vehicle/engine in question... have reset to a ready status, you must submit an OBD scan tool report showing that with the vehicle...

  13. 40 CFR 85.515 - Exemption provisions for intermediate age vehicles/engines.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... age vehicles/engines. 85.515 Section 85.515 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...-ready status using an OBD scan tool appropriate for the OBD system in the vehicle/engine in question... have reset to a ready status, you must submit an OBD scan tool report showing that with the vehicle...

  14. Camera Ready Masters. B/M-1 Resource Assessment. B/M-2 Surveying. B/M-3 Tabulation. B/M-4 Selecting Program Goals. B/M-5 Producing CDU's. Career Planning Support System.

    ERIC Educational Resources Information Center

    Ohio State Univ., Columbus. Center for Vocational Education.

    This package of camera ready masters is one of a set of twelve documents describing the Career Planning Support System (CPSS) and its use. (CPSS is a comprehensive guidance program management system which (1) provides techniques to improve a high school's career guidance program, (2) focuses on the skills students need to make decisions about and…

  15. Naval Expeditionary Logistics Support Group, Training and Evaluation Unit: An Analysis of Current Operations While Searching for Training Efficiencies

    DTIC Science & Technology

    2009-12-01

    of-the-art-classrooms and virtual reality rooms for small arms training. The outlying operational training areas are spread across Cheatham Annex...Movement, and Integration RFM Ready for Mobilization RFT Ready for Tasking SME Subject Matter Expert SWOT Strengths, Weaknesses, Opportunities...document shows that the position is filled (1.0 qualified) but the reality is that the individual is not fully qualified for the required billet (0

  16. Software to Manage the Unmanageable

    NASA Technical Reports Server (NTRS)

    2005-01-01

    In 1995, NASA s Jet Propulsion Laboratory (JPL) contracted Redmond, Washington-based Lucidoc Corporation, to design a technology infrastructure to automate the intersection between policy management and operations management with advanced software that automates document workflow, document status, and uniformity of document layout. JPL had very specific parameters for the software. It expected to store and catalog over 8,000 technical and procedural documents integrated with hundreds of processes. The project ended in 2000, but NASA still uses the resulting highly secure document management system, and Lucidoc has managed to help other organizations, large and small, with integrating document flow and operations management to ensure a compliance-ready culture.

  17. Clean Energy Technologies Ready for Climate Change Challenge

    Science.gov Websites

    environmental problems is well founded, the director of the National Renewable Energy Laboratory said today renewable energy and energy efficiency technologies in solving environmental problems is clear, Truly said

  18. NASA TEERM Principal Center Non-Chrome Projects

    NASA Technical Reports Server (NTRS)

    Rothgeb, Matthew

    2008-01-01

    Technology Evaluation for Environmental Risk Mitigation (TEERM) Principal Center Mission is to identify and validate environmental technologies through joint activities that enhance mission readiness and reduce risk while minimizing duplication and associated costs.

  19. Environmental Chemistry in the Undergraduate Laboratory.

    ERIC Educational Resources Information Center

    Wenzel, Thomas J.; Austin, Rachel N.

    2001-01-01

    Discusses the importance of environmental chemistry and the use of laboratory exercises in analytical and general chemistry courses. Notes the importance of lab work in heightening student interest in coursework including problem-based learning in undergraduate curricula, ready adaptability of environmental coursework to existing curricula, and…

  20. Industrial processing versus home cooking: an environmental comparison between three ways to prepare a meal.

    PubMed

    Sonesson, Ulf; Mattsson, Berit; Nybrant, Thomas; Ohlsson, Thomas

    2005-06-01

    Today there is a strong trend in Sweden for industrially processed meals to replace homemade meals. In the public debate this is often claimed to increase the environmental impact from foods. In the study presented in this article, we used life-cycle assessment to quantify the environmental impact of three meals: homemade, semiprepared, and ready-to-eat. The differences in environmental impact between the meals were small; the ready-to-eat meal used the most energy, whereas the homemade meal had higher emissions causing eutrophication and global warming. The dominating contributor to the environmental impact was agriculture, accounting for 30%, of the impact related to energy and 95% of that related to eutrophication. Industry, packaging, and consumer home transport and food preparation also contributed significantly. Important factors were raw material use, energy efficiency in industry and households, packaging, and residue treatment. To decrease the overall environmental impact of food consumption, improvements in agriculture are very important, together with raw-material use within industry and households.

  1. Ultra Efficient Engine Technology Systems Integration and Environmental Assessment

    NASA Technical Reports Server (NTRS)

    Daggett, David L.; Geiselhart, Karl A. (Technical Monitor)

    2002-01-01

    This study documents the design and analysis of four types of advanced technology commercial transport airplane configurations (small, medium large and very large) with an assumed technology readiness date of 2010. These airplane configurations were used as a platform to evaluate the design concept and installed performance of advanced technology engines being developed under the NASA Ultra Efficient Engine Technology (UEET) program. Upon installation of the UEET engines onto the UEET advanced technology airframes, the small and medium airplanes both achieved an additional 16% increase in fuel efficiency when using GE advanced turbofan engines. The large airplane achieved an 18% increase in fuel efficiency when using the P&W geared fan engine. The very large airplane (i.e. BWB), also using P&W geared fan engines, only achieved an additional 16% that was attributed to a non-optimized airplane/engine combination.

  2. 77 FR 27742 - Notice of Public Meetings for the Draft Environmental Impact Statement/Overseas Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-11

    ...) 12114, the Department of the Navy (DoN) has prepared and filed with the U.S. Environmental Protection... potential environmental effects associated with military readiness training and research, development, test... coast of North America and the Gulf of Mexico. The Study Area covers approximately 2.6 million square...

  3. 40 CFR 85.520 - Exemption provisions for outside useful life vehicles/engines.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... useful life vehicles/engines. 85.520 Section 85.520 Protection of Environment ENVIRONMENTAL PROTECTION... monitors to not-ready status using an OBD scan tool appropriate for the OBD system in the vehicle/engine in... have reset to a ready status, you must submit an OBD scan tool report showing that with the vehicle...

  4. 40 CFR 85.520 - Exemption provisions for outside useful life vehicles/engines.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... useful life vehicles/engines. 85.520 Section 85.520 Protection of Environment ENVIRONMENTAL PROTECTION... monitors to not-ready status using an OBD scan tool appropriate for the OBD system in the vehicle/engine in... have reset to a ready status, you must submit an OBD scan tool report showing that with the vehicle...

  5. Documenting life: a new campaign style is ready for its close-up in healthcare.

    PubMed

    McLaughlin, Kandace

    2007-01-01

    Documentary-style filming is a cost-effective way to develop an advertising campaign. This unique style of filming includes documenting the day-to-day life of a healthcare facility and then using the footage for multiple campaign elements. With no script to work with, the footage and responses are real and the outcome is rewarding.

  6. ENVIRONMENTAL TECHNOLOGY VERIFICATION: A VEHICLE FOR INDEPENDENT, CREDIBLE PERFORMANCE RESULTS ON COMMERCIALLY READY TECHNOLOGIES

    EPA Science Inventory

    The paper discusses the U. S. Environmental Protection Agency's Environmental Technology Verification (ETV) Program: its history, operations, past successes, and future plans. Begun in 1995 in response to President Clinton's "Bridge to a Sustainable Future" as a means to work wit...

  7. Transportation plan repository and archive.

    DOT National Transportation Integrated Search

    2011-04-01

    This project created a repository and archive for transportation planning documents in Texas within the : established Texas A&M Repository (http://digital.library.tamu.edu). This transportation planning archive : and repository provides ready access ...

  8. Partnership readiness for community-based participatory research

    PubMed Central

    Andrews, Jeannette O.; Newman, Susan D.; Meadows, Otha; Cox, Melissa J.; Bunting, Shelia

    2012-01-01

    The use of a dyadic lens to assess and leverage academic and community partners’ readiness to conduct community-based participatory research (CBPR) has not been systematically investigated. With a lack of readiness to conduct CBPR, the partnership and its products are vulnerable. The purpose of this qualitative study was to explore the dimensions and key indicators necessary for academic and community partnership readiness to conduct CBPR. Key informant interviews and focus groups (n = 36 participants) were conducted with academic and community participants who had experiences with CBPR partnerships. A ‘framework analysis' approach was used to analyze the data and generate a new model, CBPR Partnership Readiness Model. Antecedents of CBPR partnership readiness are a catalyst and mutual interest. The major dimensions of the CBPR Partnership Readiness Model are (i) goodness of fit, (ii) capacity, and (iii) operations. Preferred outcomes are sustainable partnership and product, mutual growth, policy and social and health impact on the community. CBPR partnership readiness is an iterative and dynamic process, partnership and issue specific, influenced by a range of environmental and contextual factors, amenable to change and essential for sustainability and promotion of health and social change in the community. PMID:20837654

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    VonThoma, E.; Mosiman, G.

    This report documents the process and outcomes involved in achieving the U.S. Department of Energy Zero Energy Ready Home (ZERH) program certification standards while helping homebuilders in Climate Zones 5 and 6 in the Upper Midwest achieve ZERH certification.

  10. Evidence-based integrated environmental solutions for secondary lead smelters: pollution prevention and waste minimization technologies and practices.

    PubMed

    Genaidy, A M; Sequeira, R; Tolaymat, T; Kohler, J; Rinder, M

    2009-05-01

    An evidence-based methodology was adopted in this research to establish strategies to increase lead recovery and recycling via a systematic review and critical appraisal of the published literature. In particular, the research examines pollution prevention and waste minimization practices and technologies that meet the following criteria: (a) reduce/recover/recycle the largest quantities of lead currently being disposed of as waste, (b) technically and economically viable, that is, ready to be diffused and easily transferable, and (c) strong industry interest (i.e., industry would consider implementing projects with higher payback periods). The following specific aims are designed to achieve the study objectives: Aim 1 - To describe the recycling process of recovering refined lead from scrap; Aim 2 - To document pollution prevention and waste management technologies and practices adopted by US stakeholders along the trajectory of LAB and lead product life cycle; Aim 3 - To explore improved practices and technologies which are employed by other organizations with an emphasis on the aforementioned criteria; Aim 4 - To demonstrate the economic and environmental costs and benefits of applying improved technologies and practices to existing US smelting operations; and Aim 5 - To evaluate improved environmental technologies and practices using an algorithm that integrates quantitative and qualitative criteria. The process of identifying relevant articles and reports was documented. The description of evidence was presented for current practices and technologies used by US smelters as well as improved practices and technologies. Options for integrated environmental solutions for secondary smelters were introduced and rank ordered on the basis of costs (i.e., capital investment) and benefits (i.e., production increases, energy and flux savings, and reduction of SO(2) and slag). An example was provided to demonstrate the utility of the algorithm by detailing the costs and benefits associated with different combinations of practices and technologies. The evidence-based methodology documented in this research reveals that it is technically and economically feasible to implement integrated environmental solutions to increase lead recovery and recycling among US smelters. The working example presented in this research can be confirmed with US stakeholders and form the basis for implementable solutions in the lead smelter and product industries to help reverse the overall trend of declining life-cycle recycling rates.

  11. ENVIRONMENTAL TECHNOLOGY VERIFICATION PROGRAM

    EPA Science Inventory

    This presentation will be given at the EPA Science Forum 2005 in Washington, DC. The Environmental Technology Verification Program (ETV) was initiated in 1995 to speed implementation of new and innovative commercial-ready environemntal technologies by providing objective, 3rd pa...

  12. 40 CFR 1508.10 - Environmental document.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 32 2010-07-01 2010-07-01 false Environmental document. 1508.10 Section 1508.10 Protection of Environment COUNCIL ON ENVIRONMENTAL QUALITY TERMINOLOGY AND INDEX § 1508.10 Environmental document. Environmental document includes the documents specified in § 1508.9 (environmental...

  13. 40 CFR 1508.10 - Environmental document.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 33 2011-07-01 2011-07-01 false Environmental document. 1508.10 Section 1508.10 Protection of Environment COUNCIL ON ENVIRONMENTAL QUALITY TERMINOLOGY AND INDEX § 1508.10 Environmental document. Environmental document includes the documents specified in § 1508.9 (environmental...

  14. A new in silico classification model for ready biodegradability, based on molecular fragments.

    PubMed

    Lombardo, Anna; Pizzo, Fabiola; Benfenati, Emilio; Manganaro, Alberto; Ferrari, Thomas; Gini, Giuseppina

    2014-08-01

    Regulations such as the European REACH (Registration, Evaluation, Authorization and restriction of Chemicals) often require chemicals to be evaluated for ready biodegradability, to assess the potential risk for environmental and human health. Because not all chemicals can be tested, there is an increasing demand for tools for quick and inexpensive biodegradability screening, such as computer-based (in silico) theoretical models. We developed an in silico model starting from a dataset of 728 chemicals with ready biodegradability data (MITI-test Ministry of International Trade and Industry). We used the novel software SARpy to automatically extract, through a structural fragmentation process, a set of substructures statistically related to ready biodegradability. Then, we analysed these substructures in order to build some general rules. The model consists of a rule-set made up of the combination of the statistically relevant fragments and of the expert-based rules. The model gives good statistical performance with 92%, 82% and 76% accuracy on the training, test and external set respectively. These results are comparable with other in silico models like BIOWIN developed by the United States Environmental Protection Agency (EPA); moreover this new model includes an easily understandable explanation. Copyright © 2014 Elsevier Ltd. All rights reserved.

  15. Improving Community Readiness for Change through Coalition Capacity Building: Evidence from a Multi-Site Intervention

    PubMed Central

    Anderson-Carpenter, Kaston D.; Watson-Thompson, Jomella; Jones, Marvia D.; Chaney, Lisa

    2016-01-01

    Often, community coalitions are facilitators of community-level changes when addressing underage drinking. Although studies have shown that enhancing coalition capacity is related to improved internal functioning, the relationship between enhanced capacity and community readiness for change is not well established. The present study used a pretest-posttest design to examine whether enhancing coalition capacity through training and technical assistance was associated with improved community readiness and coalition-facilitated community-level changes. Seven Kansas communities engaged in an intensive capacity building intervention through implementation of the Strategic Prevention Framework. The results indicated strong correlations between increased coalition capacity, changes in community readiness stages, and the number of community changes facilitated. The results suggest that strengthening coalition capacity through training and technical assistance may improve community readiness for change and enable the implementation of community-wide program and environmental changes. PMID:28458405

  16. Coalition Battle Management Language (C-BML) (Language de gestion du champ de bataille (C-BML)

    DTIC Science & Technology

    2012-02-01

    de gestion du champ de bataille (C-BML)) NMSG-048 Final Report. This document...BML) (Langage de gestion du champ de bataille (C-BML)) NMSG-048 Final Report. This document contains information authorized by NATO RTA for...Technical Readiness Level (TRL) that is consistent with an operational deployment. ES - 2 RTO-TR-MSG-048 Langage de gestion du champ de

  17. Institutionalizing policy-level health impact assessment in Europe: is coupling health impact assessment with strategic environmental assessment the next step forward?

    PubMed Central

    Wright, John; Parry, Jayne; Scully, Edward

    2005-01-01

    European Union (EU) Member States are interested in using health impact assessment (HIA) as a means of safeguarding their obligations to protect human health under the 1997 Treaty of Amsterdam. However, several have encountered difficulties institutionalizing HIA with the policy-making process. As a consequence, the World Health Organization (WHO) Regional Office for Europe has suggested coupling HIA with strategic environmental assessment (SEA). Traditionally, the incorporation of HIA into other forms of impact assessment has been resisted, for fear of losing its focus on health issues to environmental concerns, and compromising its social model of health with the introduction of biophysical indicators. But can these fears be substantiated? In this paper, we investigate the grounds for such concerns by reviewing the relevant policy documents and departmental guidelines of four non-European countries that have considered the use of integrated assessment. We found that the case for associating HIA with SEA in Europe is strong, and offers potential solutions to problems of screening, theoretical framework, causal pathways and ready entry to the policy process. Coupling HIA with SEA may thus be the next step forward in a longer journey towards institutionalizing HIA as an independent policy-linked device. PMID:15976899

  18. Institutionalizing policy-level health impact assessment in Europe: is coupling health impact assessment with strategic environmental assessment the next step forward?

    PubMed

    Wright, John; Parry, Jayne; Scully, Edward

    2005-06-01

    European Union (EU) Member States are interested in using health impact assessment (HIA) as a means of safeguarding their obligations to protect human health under the 1997 Treaty of Amsterdam. However, several have encountered difficulties institutionalizing HIA with the policy-making process. As a consequence, the World Health Organization (WHO) Regional Office for Europe has suggested coupling HIA with strategic environmental assessment (SEA). Traditionally, the incorporation of HIA into other forms of impact assessment has been resisted, for fear of losing its focus on health issues to environmental concerns, and compromising its social model of health with the introduction of biophysical indicators. But can these fears be substantiated? In this paper, we investigate the grounds for such concerns by reviewing the relevant policy documents and departmental guidelines of four non-European countries that have considered the use of integrated assessment. We found that the case for associating HIA with SEA in Europe is strong, and offers potential solutions to problems of screening, theoretical framework, causal pathways and ready entry to the policy process. Coupling HIA with SEA may thus be the next step forward in a longer journey towards institutionalizing HIA as an independent policy-linked device.

  19. Readiness to participate in advance care planning: A qualitative study of renal failure patients, families and healthcare providers.

    PubMed

    Hutchison, Lauren A; Raffin-Bouchal, Donna S; Syme, Charlotte A; Biondo, Patricia D; Simon, Jessica E

    2017-09-01

    Objectives Advance care planning is the process by which people reflect upon their wishes and values for healthcare, discuss their choices with family and friends and document their wishes. Readiness represents a key predictor of advance care planning participation; however, the evidence for addressing readiness is scarce within the renal failure context. Our objectives were to assess readiness for advance care planning and barriers and facilitators to advance care planning uptake in a renal context. Methods Twenty-five participants (nine patients, nine clinicians and seven family members) were recruited from the Southern Alberta Renal Program. Semi-structured interviews were recorded, transcribed and then analyzed using interpretive description. Results Readiness for advance care planning was driven by individual values perceived by a collaborative encounter between clinicians and patients/families. If advance care planning is not valued, then patients/families and clinicians are not ready to initiate the process. Patients and clinicians are delaying conversations until "illness burden necessitates," so there is little "advance" care planning, only care planning in-the-moment closer to the end of life. Discussion The value of advance care planning in collaboration with clinicians, patients and their surrogates needs reframing as an ongoing process early in the patient's illness trajectory, distinguished from end-of-life decision making.

  20. Two-Eyed Seeing into Environmental Education: Revealing Its "Natural" Readiness to Indigenize

    ERIC Educational Resources Information Center

    McKeon, Margaret

    2012-01-01

    Recent visions for environmental education now include a foundational acknowledgement that the well-being of humans and the environment are inseparable. This vision of environmental education, with a focus on interconnectedness as well as concepts of transformation, holism, caring, and responsibility, rooted in experiences of nature, community,…

  1. Environmental Attitudes and Behaviour of Secondary School Students in Hong Kong.

    ERIC Educational Resources Information Center

    Chan, Kara K. W.

    1996-01-01

    Describes an investigation into the environmental attitudes of students in Hong Kong and their readiness to engage in pro-environmental behavior that could involve change in personal lifestyle. Students' over-optimism towards technological development and the perceived importance of the benefits of modern consumer goods were major factors that…

  2. Managed Readiness Simulator (MARS) V2: Implementation of the Managed Readiness Model

    DTIC Science & Technology

    2010-12-01

    mesure de répondre aux besoins propres à un ensemble de tâches opérationnelles. La première version du programme MARS (V1) a...mise en œuvre du modèle de gestion de la disponibilité opérationnelle du MARS V2 dans la nouvelle architecture logicielle. La public cible de ce...l’établissement. Le but de la présente étude est de documenter la mise en œuvre du modèle de

  3. Transfer of Training: Does It Truly Happen?: An Examination of Support, Instrumentality, Retention and Learner Readiness on the Transfer Motivation and Transfer of Training

    ERIC Educational Resources Information Center

    Bhatti, Muhammad Awais; Battour, Mohamed Mohamed; Sundram, Veera Pandiyan Kaliani; Othman, Akmal Aini

    2013-01-01

    Purpose: The purpose of this study is to highlight the importance of selected environmental, situational and individual factors in the training transfer process. Design/methodology/approach: This study proposes and tests a framework via structural equation modelling by including supervisor and peer support, instrumentality and learner readiness on…

  4. Environmental, Economic, and Scalability Considerations and Trends of Selected Fuel Economy-Enhancing Biomass-Derived Blendstocks

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dunn, Jennifer B.; Biddy, Mary; Jones, Susanne

    24 biomass-derived compounds and mixtures, identified based on their physical properties, that could be blended into fuels to improve spark ignition engine fuel economy were assessed for their economic, technology readiness, and environmental viability. These bio-blendstocks were modeled to be produced biochemically, thermochemically, or through hybrid processes. To carry out the assessment, 17 metrics were developed for which each bio-blendstock was determined to be favorable, neutral, or unfavorable. Cellulosic ethanol was included as a reference case. Overall, bio-blendstock yields in biochemical processes were lower than in thermochemical processes, in which all biomass, including lignin, is converted to a product. Bio-blendstockmore » yields were a key determinant in overall viability. Key knowledge gaps included the degree of purity needed for use as a bio-blendstock as compared to a chemical. Less stringent purification requirements for fuels could cut processing costs and environmental impacts. Additionally, more information is needed on the blendability of many of these bio-blendstocks with gasoline to support the technology readiness evaluation. Overall, the technology to produce many of these blendstocks from biomass is emerging and as it matures, these assessments must be revisited. Importantly, considering economic, environmental, and technology readiness factors in addition to physical properties of blendstocks that could be used to boost fuel economy can help spotlight those most likely to be viable in the near term.« less

  5. Idaho National Laboratory Emergency Readiness Assurance Plan — Fiscal Year 2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    Battelle Energy Alliance, LLC, the prime contractor for Idaho National Laboratory (INL), provides this Emergency Readiness Assurance Plan (ERAP) for Fiscal Year 2016 in accordance with DOE O 151.1C, “Comprehensive Emergency Management System.” The ERAP documents the readiness of the INL Emergency Management Program using emergency response planning and preparedness activities as the basis. It describes emergency response planning and preparedness activities, and where applicable, summarizes and/or provides supporting information in tabular form for easy access to data. The ERAP also provides budget, personnel, and planning forecasts for Fiscal Year 2017. Specifically, the ERAP assures the Department of Energy Idahomore » Operations Office that stated emergency capabilities at INL are sufficient to implement PLN 114, “INL Emergency Plan/RCRA Contingency Plan.”« less

  6. Idaho National Laboratory Emergency Readiness Assurance Plan — Fiscal Year 2014

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bush, Shane

    Battelle Energy Alliance, LLC, the prime contractor for Idaho National Laboratory (INL), provides this Emergency Readiness Assurance Plan (ERAP) for Fiscal Year 2014 in accordance with DOE O 151.1C, “Comprehensive Emergency Management System.” The ERAP documents the readiness of the INL Emergency Management Program using emergency response planning and preparedness activities as the basis. It describes emergency response planning and preparedness activities, and where applicable, summarizes and/or provides supporting information in tabular form for easy access to data. The ERAP also provides budget, personnel, and planning forecasts for Fiscal Year 2015. Specifically, the ERAP assures the Department of Energy Idahomore » Operations Office that stated emergency capabilities at INL are sufficient to implement PLN-114, “INL Emergency Plan/RCRA Contingency Plan.”« less

  7. Climate Ready Estuaries Rolling Easements Primer

    EPA Pesticide Factsheets

    Rolling easements enable wetlands and beaches to migrate inland and allow society to avoid the costs and hazards of protecting low lands from rising sea levels. This document provides a primer on more than a dozen rolling easement approaches.

  8. ASA24® Instructions for Study Staff & Respondents

    Cancer.gov

    The following documents have been created by the National Cancer Institute (NCI) as resources for study staff and Respondents. Each resource is available as a ready-to-use PDF to allow users to adapt the content as desired.

  9. BEST SCHOOL PRACTICES YEARBOOK, 1964-1965.

    ERIC Educational Resources Information Center

    1965

    ARTICLES INCLUDED IN THIS DOCUMENT ARE--(1) "EXPERIENCES OF SOME SECOND GRADE TEACHERS IN MODERN MATHEMATICS," (2) "THE TORCH OF LEARNING," (3) "TEACHING TRAINABLE MENTALLY RETARDED-DEQUEEN PUBLIC SCHOOLS," (4) "TEACHER READINESS TAKES TIME, MONEY, PARTICIPATION," (5) "ATTENDING SCHOOL VIA…

  10. Arizona Academic Standards: Kindergarten

    ERIC Educational Resources Information Center

    Arizona Department of Education, 2009

    2009-01-01

    This publication contains Arizona public schools' academic standards for kindergarten. The contents of this document include the following: (1) The Arts Standard 2006--Kindergarten; (2) Comprehensive Health Education/Physical Activity Standards 1997--Readiness (Kindergarten); (3) Foreign and Native Language Standards 1997--Readiness…

  11. ETV COLLABORATIVE EVALUATIONS OF MARKET-READY TECHNOLOGIES FOR ARSENIC REMOVAL IN DRINKING WATER

    EPA Science Inventory

    How well do some commercially marketed package treatment systems perform to reduce arsenic from drinking water supplies? The Environmental Technology Verification (ETV) Drinking Water Systems (DWS) Center is a partnership between the U.S. Environmental Protection Agency (U.S. EPA...

  12. Early Market TRL/MRL Analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ronnebro, Ewa; Stetson, Ned

    he focus of this report is TRL/MRL analysis of hydrogen storage; it documents the methodology and results of an effort to identify hydrogen storage technologies’ technical and manufacturing readiness for early market motive and non-motive applications and to provide a path forward toward commercialization. Motive applications include materials handling equipment (MHE) and ground support equipment (GSE), such as forklifts, tow tractors, and specialty vehicles such as golf carts, lawn mowers and wheel chairs. Non-motive applications are portable, stationary or auxiliary power units (APUs) and include portable laptops, backup power, remote sensor power, and auxiliary power for recreational vehicles, hotels, hospitals,more » etc. Hydrogen storage technologies assessed include metal hydrides, chemical hydrides, sorbents, gaseous storage, and liquid storage. The assessments are based on a combination of Technology Readiness Level (TRL) and Manufacturing Readiness Level (MRL) designations that enable evaluation of hydrogen storage technologies at varying levels of development. The manufacturing status could be established from eight risk elements: Technical Maturity, Design, Materials, Cost & Funding, Process Capability, Personnel, Facilities and Manufacturing Planning. This approach provides a logical methodology and roadmap to enable the identification of hydrogen storage technologies, their advantages/disadvantages, gaps and R&D needs on an unbiased and transparent scale that is easily communicated to interagency partners. This technology readiness assessment (TRA) report documents the process used to conduct the TRA/MRA (technology and manufacturing readiness assessment), reports the TRL and MRL for each assessed technology and provides recommendations based on the findings. To investigate the state of the art and needs to mature the technologies, PNNL prepared a questionnaire to assign TRL and MRL for each hydrogen storage technology. The questionnaire was sent to identified hydrogen storage technology developers and manufacturers who were asked to perform a self-assessment. We included both domestic and international organizations including U.S. national laboratories, U.S. companies, European companies and Japanese companies. PNNL collected the data and performed an analysis to deduce the level of maturity and to provide program recommendations.« less

  13. Management assessment of tank waste remediation system contractor readiness to proceed with phase 1B privatization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Certa, P.J.

    1998-01-07

    Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technical Baselines, work breakdown structures, tank farms organizational structure and configurations,more » work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined.« less

  14. National outbreak of Salmonella Give linked to a local food manufacturer in Malta, October 2016.

    PubMed

    Donachie, A; Melillo, T; Bubba, L; Hartman, H; Borg, M-L

    2018-06-26

    Salmonella Give is a rare serotype across Europe. In October 2016, a national outbreak of S. Give occurred in Malta. We describe the epidemiological, environmental, microbiological and veterinary investigations. Whole-genome sequencing (WGS) was performed on human, food, environmental and veterinary isolates. Thirty-six human cases were reported between October and November 2016, 10 (28%) of whom required hospitalisation. Twenty-six (72%) cases were linked to four restaurants. S. Give was isolated from ready-to-eat antipasti served by three restaurants which were all supplied by the same local food manufacturer. Food-trace-back investigations identified S. Give in packaged bean dips, ham, pork and an asymptomatic food handler at the manufacturer; inspections found inadequate separation between raw and ready-to-eat food during processing. WGS indicated two genetically distinguishable strains of S. Give with two distinct clusters identified; one cluster linked to the local food manufacturer and a second linked to veterinary samples. Epidemiological, environmental and WGS evidence pointed towards cross-contamination of raw and ready-to-eat foods at the local manufacturer as the likely source of one cluster. Severity of illness indicates a high virulence of this specific serotype. To prevent future cases and outbreaks, adherence to food safety practices at manufacturing level need to be reinforced.

  15. BIBLIOGRAPHY ON TESTING AND MEASUREMENT.

    ERIC Educational Resources Information Center

    Harvard Univ., Cambridge, MA. Graduate School of Education.

    THIS BIBLIOGRAPHY LISTS MATERIAL ON VARIOUS ASPECTS OF TESTING AND MEASUREMENT. APPROXIMATELY 80 UNANNOTATED REFERENCES ARE PROVIDED TO DOCUMENTS DATING FROM 1960 TO 1966. JOURNALS, BOOKS, AND REPORT MATERIALS ARE LISTED. SUBJECT AREAS INCLUDED ARE SCHOOL READINESS, CRITERION MEASURES, LONGITUDINAL ANALYSIS, PERSONALITY MEASUREMENT, STATISTICAL…

  16. Framework for Testing the Effectiveness of Bat and Eagle Impact-Reduction Strategies at Wind Energy Projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sinclair, Karin; DeGeorge, Elise

    2016-04-13

    The objectives of this framework are to facilitate the study design and execution to test the effectiveness of bat and eagle impact-reduction strategies at wind energy sites. Through scientific field research, the wind industry and its partners can help determine if certain strategies are ready for operational deployment or require further development. This framework should be considered a living document to be improved upon as fatality-reduction technologies advance from the initial concepts to proven readiness (through project- and technology-specific testing) and as scientific field methods improve.

  17. 7 CFR 650.11 - Environmental documents.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Environmental documents. 650.11 Section 650.11....11 Environmental documents. (a) NRCS is to use the following documents in compliance with NEPA (see § 650.4): (1) Environmental assessments (EA) (2) Environmental impact statements (EIS) (3) Notice of...

  18. THE U.S. ENVIRONMENTAL PROTECTION AGENCY'S SITE EMERGING TECHNOLOGY PROGRAM

    EPA Science Inventory

    Under the SITE Emerging Technology Program, the U.S. Environmental Protection Agency is seeking to foster the further development of technol- ogies that have been successfully tested at bench-scale and are now ready for pilot-scale testing, prior to field- or full-scale demonstra...

  19. Evaluating the Impact of Environmentally Friendly Cleaners on System Readiness

    DTIC Science & Technology

    2001-04-05

    branches of the armed services. USAEC and ATC are currently leading a multi-agency initiative to comprehensively test several cleaning products and...34 Any panel with pitting was given a severity rating of 4. Some cleaning products tested to date have had difficulty meeting the criterion for sandwich...DOD agencies will be able to better preserve readiness, save money and avoid bad decisions by knowing which alternative cleaning products meet its

  20. Amphibious Ready Group/Marine Expeditionary Unit Readiness Training Final Environmental Assessment

    DTIC Science & Technology

    2003-04-11

    above and below by the Pensacola Clay confining bed. This clay layer restricts the downward migration of pollutants and restricts saline water from...separates the Upper and Lower Limestone units. Because it is saline , the Lower Limestone unit is not used as a water source (U.S. Air Force, 1995...and a freshwater species, Ruppia maritima (widgeon grass). Widgeon grass is most common in brackish waters but can tolerate higher salinities

  1. Army Hearing Program Talking Points Calendar Year 2015

    DTIC Science & Technology

    2016-12-14

    outside the range of normal hearing sensitivity (greater than 25 dB), CY15 data.  Data: DOEHRS-HC Data Repository , Soldiers who had a DD2215 or...1.  Data: Defense Occupational and Environmental Health Readiness System-Hearing Conservation (DOEHRS-HC) Data Repository , CY15—Army Profile...Soldiers have a hearing loss that required a fit-for-duty (Readiness) evaluation:  An H-3 Hearing Profile.  Data: DOEHRS-HC Data Repository

  2. ASTP experiment support data processing

    NASA Technical Reports Server (NTRS)

    Osburn, R. K.; Barnett, E. L.; Moore, H. L.; Moore, J. B.; Ball, J. R.

    1975-01-01

    Activities associated with the generation of ASTP experiment support data in the areas of spacecraft ephemeris and orientation and instrument pointing and field-of-view are documented. It is intended that this document represent a cradle-to-grave chronicle of these activities. To satisfy this intent while facilitating the ready dissemination of information, the document is being published twice. The first publication, scheduled for release prior to ASTP liftoff, includes all preflight phases of the experiment support activity in addition to those appendixes that do not pertain to any mission-specific data. The second publication will provide any required updates to the original documentation and will add all mission-specific data, including documentation of all postflight data processing activities and data archiving information.

  3. NASA Processes and Requirements for Conducting Human-in-the-Loop Closed Chamber Tests

    NASA Technical Reports Server (NTRS)

    Barta, Daniel J.; Montz, Michael E.

    2004-01-01

    NASA has specific processes and requirements that must be followed for tests involving human subjects to be conducted in a safe and effective manner. There are five distinct phases of test operations. Phase one, the test request phase, consists of those activities related to initiating, processing, reviewing, and evaluating the test request. Phase two, the test preparation phase consists of those activities related to planning, coordinating, documenting, and building up the test. Phase three, the test readiness phase consists of those activities related to verifying and reviewing the planned test operations. Phase four, the test activity phase, consists of all pretest operations, functional checkouts, emergency drills, and test operations. Phase five, the post test activity phase, consists of those activities performed once the test is completed, including briefings, documentation of anomalies, data reduction and archiving, and reporting. Project management processes must be followed for facility modifications and major test buildup, which include six phases: initiation and assessment, requirements evaluation, preliminary design, detailed design, use readiness review (URR) and acceptance. Compliance with requirements for safety and quality assurance are documented throughout the test buildup and test operation processes. Tests involving human subjects must be reviewed by the applicable Institutional Review Board (IRB).

  4. SaludableOmaha: development of a youth advocacy initiative to increase community readiness for obesity prevention, 2011-2012.

    PubMed

    Frerichs, Leah; Brittin, Jeri; Stewart, Catherine; Robbins, Regina; Riggs, Cara; Mayberger, Susan; Cervantes, Alberto; Huang, Terry T-K

    2012-01-01

    Childhood obesity rates in minority populations continue to rise despite leveling national trends. Although interventions that address social and environmental factors exist, processes that create demand for policy and environmental change within communities have not been identified. We developed a pilot program in South Omaha, a Nebraska Latino community, based on the community readiness model (CRM), called SaludableOmaha. We used CRM to explore the potential of youth advocacy to shift individual and community norms regarding obesity prevention in South Omaha and to advocate for health-promoting community environments. We used CRM to assess supply and demand for health programs, engage the community, determine the community's baseline readiness to address childhood obesity, and guide youth advocacy program development. We conducted our project in 2 phases. In the first, we trained a cohort of youth. In the second, the youth cohort created and launched a Latino health movement, branded as SaludableOmaha. A third phase, which is currently under way, is directed at institutionalizing youth advocacy in communities. At baseline, the community studied was at a low stage of readiness for change. Our program generated infrastructure and materials to support the growth and institutionalization of youth advocacy as a means of increasing community readiness for addressing obesity prevention. CRM is an important tool for addressing issues such as childhood obesity in underserved communities because it provides a framework for matching interventions to the community. Community partnerships such as SaludableOmaha can aid the adoption of obesity prevention programs.

  5. SaludableOmaha: Development of a Youth Advocacy Initiative to Increase Community Readiness for Obesity Prevention, 2011–2012

    PubMed Central

    Frerichs, Leah; Brittin, Jeri; Stewart, Catherine; Robbins, Regina; Riggs, Cara; Mayberger, Susan; Cervantes, Alberto

    2012-01-01

    Background Childhood obesity rates in minority populations continue to rise despite leveling national trends. Although interventions that address social and environmental factors exist, processes that create demand for policy and environmental change within communities have not been identified. Community Context We developed a pilot program in South Omaha, a Nebraska Latino community, based on the community readiness model (CRM), called SaludableOmaha. We used CRM to explore the potential of youth advocacy to shift individual and community norms regarding obesity prevention in South Omaha and to advocate for health-promoting community environments. Methods We used CRM to assess supply and demand for health programs, engage the community, determine the community’s baseline readiness to address childhood obesity, and guide youth advocacy program development. We conducted our project in 2 phases. In the first, we trained a cohort of youth. In the second, the youth cohort created and launched a Latino health movement, branded as SaludableOmaha. A third phase, which is currently under way, is directed at institutionalizing youth advocacy in communities. Outcome At baseline, the community studied was at a low stage of readiness for change. Our program generated infrastructure and materials to support the growth and institutionalization of youth advocacy as a means of increasing community readiness for addressing obesity prevention. Interpretation CRM is an important tool for addressing issues such as childhood obesity in underserved communities because it provides a framework for matching interventions to the community. Community partnerships such as SaludableOmaha can aid the adoption of obesity prevention programs. PMID:23217590

  6. 36 CFR 1222.26 - What are the general recordkeeping requirements for agency programs?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT CREATION AND MAINTENANCE OF FEDERAL RECORDS... to document program policies, procedures, functions, activities, and transactions; (b) The office... administrator responsible for ensuring authenticity, protection, and ready retrieval of electronic records; (c...

  7. 36 CFR 1222.26 - What are the general recordkeeping requirements for agency programs?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT CREATION AND MAINTENANCE OF FEDERAL RECORDS... to document program policies, procedures, functions, activities, and transactions; (b) The office... administrator responsible for ensuring authenticity, protection, and ready retrieval of electronic records; (c...

  8. 36 CFR 1222.26 - What are the general recordkeeping requirements for agency programs?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT CREATION AND MAINTENANCE OF FEDERAL RECORDS... to document program policies, procedures, functions, activities, and transactions; (b) The office... administrator responsible for ensuring authenticity, protection, and ready retrieval of electronic records; (c...

  9. Shaping the future of naval warfare with unmanned systems

    DOT National Transportation Integrated Search

    2001-07-01

    This report presents the findings of a study conducted for the purpose of understanding how unmanned systems can enhance the readiness of U.S. Naval forces. The document presents reasons why unmanned systems should be adopted by the Navy, and makes t...

  10. CRAY mini manual. Revision D

    NASA Technical Reports Server (NTRS)

    Tennille, Geoffrey M.; Howser, Lona M.

    1993-01-01

    This document briefly describes the use of the CRAY supercomputers that are an integral part of the Supercomputing Network Subsystem of the Central Scientific Computing Complex at LaRC. Features of the CRAY supercomputers are covered, including: FORTRAN, C, PASCAL, architectures of the CRAY-2 and CRAY Y-MP, the CRAY UNICOS environment, batch job submittal, debugging, performance analysis, parallel processing, utilities unique to CRAY, and documentation. The document is intended for all CRAY users as a ready reference to frequently asked questions and to more detailed information contained in the vendor manuals. It is appropriate for both the novice and the experienced user.

  11. The relationship between assessment methods and self-directed learning readiness in medical education.

    PubMed

    Monroe, Katherine S

    2016-03-11

    This research explored the assessment of self-directed learning readiness within the comprehensive evaluation of medical students' knowledge and skills and the extent to which several variables predicted participants' self-directed learning readiness prior to their graduation. Five metrics for evaluating medical students were considered in a multiple regression analysis. Fourth-year medical students at a competitive US medical school received an informed consent and an online survey. Participants voluntarily completed a self-directed learning readiness scale that assessed four subsets of self-directed learning readiness and consented to the release of their academic records. The assortment of metrics considered in this study only vaguely captured students' self-directedness. The strongest predictors were faculty evaluations of students' performance on clerkship rotations. Specific clerkship grades were mildly predictive of three subscales. The Pediatrics clerkship modestly predicted critical self-evaluation (r=-.30, p=.01) and the Psychiatry clerkship mildly predicted learning self-efficacy (r =-.30, p=.01), while the Junior Surgery clerkship nominally correlated with participants' effective organization for learning (r=.21, p=.05). Other metrics examined did not contribute to predicting participants' readiness for self-directed learning. Given individual differences among participants for the variables considered, no combination of students' grades and/or test scores overwhelmingly predicted their aptitude for self-directed learning. Considering the importance of fostering medical students' self-directed learning skills, schools need a reliable and pragmatic approach to measure them. This data analysis, however, offered no clear-cut way of documenting students' self-directed learning readiness based on the evaluation metrics included.

  12. Definition, technology readiness, and development cost of the orbit transfer vehicle engine integrated control and health monitoring system elements

    NASA Technical Reports Server (NTRS)

    Cannon, I.; Balcer, S.; Cochran, M.; Klop, J.; Peterson, S.

    1991-01-01

    An Integrated Control and Health Monitoring (ICHM) system was conceived for use on a 20 Klb thrust baseline Orbit Transfer Vehicle (OTV) engine. Considered for space used, the ICHM was defined for reusability requirements for an OTV engine service free life of 20 missions, with 100 starts and a total engine operational time of 4 hours. Functions were derived by flowing down requirements from NASA guidelines, previous OTV engine or ICHM documents, and related contracts. The elements of an ICHM were identified and listed, and these elements were described in sufficient detail to allow estimation of their technology readiness levels. These elements were assessed in terms of technology readiness level, and supporting rationale for these assessments presented. The remaining cost for development of a minimal ICHM system to technology readiness level 6 was estimated. The estimates are within an accuracy range of minus/plus 20 percent. The cost estimates cover what is needed to prepare an ICHM system for use on a focussed testbed for an expander cycle engine, excluding support to the actual test firings.

  13. Emotional, Cognitive and Self-Enhancement Processes in Aggressive Behavior After Interpersonal Rejection and Exclusion.

    PubMed

    Rajchert, Joanna

    2015-11-01

    The relationship between exclusion or rejection and aggression is already well documented, but there is still a debate about the mechanisms that underlie this effect. In two studies we focused on the propensity to react aggressively (readiness for aggression) on the bases of emotional, cognitive or self-enhancement (personality-immanent) processes. In both studies we first measured readiness for aggression and then ego-depleted participants. Next, in Study 1 we excluded participants (n = 96) using an online ball throwing game and measured displaced aggressive behavior - intensity and duration of an unpleasant noise administrated to a stranger. In Study 2 participants (n = 140) were rejected by a peer on the basis of an interview that they gave and then could retaliate by reducing peer's chance for getting a job. The results show that exclusion effect on displaced aggression was moderated by cognitive readiness for aggression, while rejection effect on retaliatory aggression was shaped by emotional and personality-immanent readiness for aggression as well as ego-depletion. The results were discussed in light of the strength model of self-control by Baumeister, Vohs, and Tice (2007).

  14. Expeditionary Readiness Training (ExpeRT) Course Expansion Final Environmental Assessment Creech Air Force Base

    DTIC Science & Technology

    2006-07-01

    potential environmental consequences of the proposed action and no-action alternative and are addressed for: air quality, soils and water resources...evaluated in detail to identify potential environmental consequences: air quality; soils and water resources; biological resources; and cultural resources...significance. Therefore, this proposed action would not constitute a significant impact and would conform to regional standards. Soils and Water Resources

  15. Setting Hurricane Conditions of Readiness with High Confidence.

    DTIC Science & Technology

    1984-05-01

    AD-A144 785SETTING HURRICANE CONDITIONS OF READINESS WITH HIGH i/ CONFIDENCE(U) SCIENCE APPLICATIONS INC MONTEREY CA G KOSTYSHACK ET AL. MAY 84 NEPRF...HIGH CONFIDENCE CA qtJ V m r"Prepared By: Geoff Kostyshack and Jerry Jarrell -- Science Applications, Inc. Monterey, California 93940 Contract No...N00228-83-C-3079 DTIC ELECTE AUG2 3 lg4 MAY 1984 SS APPROVED FOR PUBLIC RELEASE; DISTRIBUTION IS UNLIMITED Prepared For: INAVAL ENVIRONMENTAL PREDICTION

  16. The Effects of Molecular Properties on Ready Biodegradation of Aromatic Compounds in the OECD 301B CO2 Evolution Test.

    PubMed

    He, Mei; Mei, Cheng-Fang; Sun, Guo-Ping; Li, Hai-Bei; Liu, Lei; Xu, Mei-Ying

    2016-07-01

    Ready biodegradation is the primary biodegradability of a compound, which is used for discriminating whether a compound could be rapidly and readily biodegraded in the natural ecosystems in a short period and has been applied extensively in the environmental risk assessment of many chemicals. In this study, the effects of 24 molecular properties (including 2 physicochemical parameters, 10 geometrical parameters, 6 topological parameters, and 6 electronic parameters) on the ready biodegradation of 24 kinds of synthetic aromatic compounds were investigated using the OECD 301B CO2 Evolution test. The relationship between molecular properties and ready biodegradation of these aromatic compounds varied with molecular properties. A significant inverse correlation was found for the topological parameter TD, five geometrical parameters (Rad, CAA, CMA, CSEV, and N c), and the physicochemical parameter K ow, and a positive correlation for two topological parameters TC and TVC, whereas no significant correlation was observed for any of the electronic parameters. Based on the correlations between molecular properties and ready biodegradation of these aromatic compounds, the importance of molecular properties was demonstrated as follows: geometrical properties > topological properties > physicochemical properties > electronic properties. Our study first demonstrated the effects of molecular properties on ready biodegradation by a number of experiment data under the same experimental conditions, which should be taken into account to better guide the ready biodegradation tests and understand the mechanisms of the ready biodegradation of aromatic compounds.

  17. Corporate [and] Distance Education. [SITE 2002 Sections].

    ERIC Educational Resources Information Center

    Fuller, Frank, Ed.; McBride, Ron, Ed.

    This document contains one paper on corporate issues, discussing ThinkQuest for Tomorrow's Teachers, and more than 100 papers on distance education from the SITE (Society for Information Technology & Teacher Education) 2002 conference. Topics covered include: improved communication through online discussion; assessing the readiness of distance…

  18. Operational Readiness Review Plan for the Radioisotope Thermoelectric Generator Materials Production Tasks

    DOE R&D Accomplishments Database

    Cooper, R. H.; Martin, M. M.; Riggs, C. R.; Beatty, R. L.; Ohriner, E. K.; Escher, R. N.

    1990-04-19

    In October 1989, a US shuttle lifted off from Cape Kennedy carrying the spacecraft Galileo on its mission to Jupiter. In November 1990, a second spacecraft, Ulysses, will be launched from Cape Kennedy with a mission to study the polar regions of the sun. The prime source of power for both spacecraft is a series of radioisotope thermoelectric generators (RTGs), which use plutonium oxide (plutonia) as a heat source. Several of the key components in this power system are required to ensure the safety of both the public and the environment and were manufactured at Oak Ridge National Laboratory (ORNL) in the 1980 to 1983 period. For these two missions, Martin Marietta Energy Systems, Inc. (Energy Systems), will provide an iridium alloy component used to contain the plutonia heat source and a carbon composite material that serves as a thermal insulator. ORNL alone will continue to fabricate the carbon composite material. Because of the importance to DOE that Energy Systems deliver these high quality components on time, performance of an Operational Readiness Review (ORR) of these manufacturing activities is necessary. Energy Systems Policy GP 24 entitled "Operational Readiness Process" describes the formal and comprehensive process by which appropriate Energy Systems activities are to be reviewed to ensure their readiness. This Energy System policy is aimed at reducing the risks associated with mission success and requires a management approved "readiness plan" to be issued. This document is the readiness plan for the RTG materials production tasks.

  19. Management assessment of tank waste remediation system contractor readiness to proceed with phase 1B privatization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Honeyman, J.O.

    1998-01-09

    This Management Assessment of Tank Waste Remediation System (TWRS) Contractor Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technicalmore » Baselines, work breakdown structures, tank farms organizational structure and configurations, work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on-line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined.« less

  20. 38 CFR 26.7 - VA environmental decision making and documents.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... environmental decision making and documents. (a) Relevant environmental documents shall accompany other decision documents as they proceed through the decision-making process. (b) The major decision points for VA actions... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false VA environmental decision...

  1. 43 CFR 46.105 - Using a contractor to prepare environmental documents.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... IMPLEMENTATION OF THE NATIONAL ENVIRONMENTAL POLICY ACT OF 1969 Protection and Enhancement of Environmental... contractor to prepare any environmental document in accordance with the standards of 40 CFR 1506.5(b) and (c...) Preparation and adequacy of the environmental documents; and (b) Independent evaluation of the environmental...

  2. 43 CFR 46.105 - Using a contractor to prepare environmental documents.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... IMPLEMENTATION OF THE NATIONAL ENVIRONMENTAL POLICY ACT OF 1969 Protection and Enhancement of Environmental... contractor to prepare any environmental document in accordance with the standards of 40 CFR 1506.5(b) and (c...) Preparation and adequacy of the environmental documents; and (b) Independent evaluation of the environmental...

  3. Is Mold the New Asbestos?

    ERIC Educational Resources Information Center

    Colgan, Craig

    2003-01-01

    Mold and indoor air quality (IAQ) are matters of major concern to architects and their educational clients. The Environmental Protection Agency's Indoor Air Quality Tools for Schools program offers help to districts seeking to tackle IAQ issues. Strengthening community relations is one way to be ready in case of a bad environmental or IAQ report.…

  4. Inclusion of Children with Disabilities: Teachers' Attitudes and Requirements for Environmental Accommodations

    ERIC Educational Resources Information Center

    Gal, Eynat; Schreur, Naomi; Engel-Yeger, Batya

    2010-01-01

    Teachers in general education are expected to cope with students with diverse needs. They might not always be ready or sufficiently supported to meet these challenges. The current study aims at identifying child, teacher and environmental barriers to inclusion. Specifically it addresses the importance of preschool teachers' attitudes as the human…

  5. Safety assessment of discharge chute isolation barrier preparation and installation. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Meichle, R.H.

    1994-10-10

    This revision responds to RL comments and increases the discussion of the ``effective hazard categorization`` and the readiness review basis. The safety assessment is made for the activities for the preparation and installation of the discharge chute isolation barriers. The safety assessment includes a hazard assessment and comparison of potential accidents/events to those addressed by the current safety basis documentation. No significant hazards were identified. An evaluation against the USQ evaluation questions were made and the determination made that the activities do not represent a USQ. Hazard categorization techniques were used to provide a basis for readiness review classification.

  6. Linking household and health facility surveys to assess obstetric service availability, readiness and coverage: evidence from 17 low- and middle-income countries.

    PubMed

    Kanyangarara, Mufaro; Chou, Victoria B; Creanga, Andreea A; Walker, Neff

    2018-06-01

    Improving access and quality of obstetric service has the potential to avert preventable maternal, neonatal and stillborn deaths, yet little is known about the quality of care received. This study sought to assess obstetric service availability, readiness and coverage within and between 17 low- and middle-income countries. We linked health facility data from the Service Provision Assessments and Service Availability and Readiness Assessments, with corresponding household survey data obtained from the Demographic and Health Surveys and Multiple Indicator Cluster Surveys. Based on performance of obstetric signal functions, we defined four levels of facility emergency obstetric care (EmOC) functionality: comprehensive (CEmOC), basic (BEmOC), BEmOC-2, and low/substandard. Facility readiness was evaluated based on the direct observation of 23 essential items; facilities "ready to provide obstetric services" had ≥20 of 23 items available. Across countries, we used medians to characterize service availability and readiness, overall and by urban-rural location; analyses also adjusted for care-seeking patterns to estimate population-level coverage of obstetric services. Of the 111 500 health facilities surveyed, 7545 offered obstetric services and were included in the analysis. The median percentages of facilities offering EmOC and "ready to provide obstetric services" were 19% and 10%, respectively. There were considerable urban-rural differences, with absolute differences of 19% and 29% in the availability of facilities offering EmOC and "ready to provide obstetric services", respectively. Adjusting for care-seeking patterns, results from the linking approach indicated that among women delivering in a facility, a median of 40% delivered in facilities offering EmOC, and 28% delivered in facilities "ready to provide obstetric services". Relatively higher coverage of facility deliveries (≥65%) and coverage of deliveries in facilities "ready to provide obstetric services" (≥30% of facility deliveries) were only found in three countries. The low levels of availability, readiness and coverage of obstetric services documented represent substantial missed opportunities within health systems. Global and national efforts need to prioritize upgrading EmOC functionality and improving readiness to deliver obstetric service, particularly in rural areas. The approach of linking health facility and household surveys described here could facilitate the tracking of progress towards quality obstetric care.

  7. Linking household and health facility surveys to assess obstetric service availability, readiness and coverage: evidence from 17 low- and middle-income countries

    PubMed Central

    Kanyangarara, Mufaro; Chou, Victoria B; Creanga, Andreea A; Walker, Neff

    2018-01-01

    Background Improving access and quality of obstetric service has the potential to avert preventable maternal, neonatal and stillborn deaths, yet little is known about the quality of care received. This study sought to assess obstetric service availability, readiness and coverage within and between 17 low- and middle-income countries. Methods We linked health facility data from the Service Provision Assessments and Service Availability and Readiness Assessments, with corresponding household survey data obtained from the Demographic and Health Surveys and Multiple Indicator Cluster Surveys. Based on performance of obstetric signal functions, we defined four levels of facility emergency obstetric care (EmOC) functionality: comprehensive (CEmOC), basic (BEmOC), BEmOC-2, and low/substandard. Facility readiness was evaluated based on the direct observation of 23 essential items; facilities “ready to provide obstetric services” had ≥20 of 23 items available. Across countries, we used medians to characterize service availability and readiness, overall and by urban-rural location; analyses also adjusted for care-seeking patterns to estimate population-level coverage of obstetric services. Results Of the 111 500 health facilities surveyed, 7545 offered obstetric services and were included in the analysis. The median percentages of facilities offering EmOC and “ready to provide obstetric services” were 19% and 10%, respectively. There were considerable urban-rural differences, with absolute differences of 19% and 29% in the availability of facilities offering EmOC and “ready to provide obstetric services”, respectively. Adjusting for care-seeking patterns, results from the linking approach indicated that among women delivering in a facility, a median of 40% delivered in facilities offering EmOC, and 28% delivered in facilities “ready to provide obstetric services”. Relatively higher coverage of facility deliveries (≥65%) and coverage of deliveries in facilities “ready to provide obstetric services” (≥30% of facility deliveries) were only found in three countries. Conclusions The low levels of availability, readiness and coverage of obstetric services documented represent substantial missed opportunities within health systems. Global and national efforts need to prioritize upgrading EmOC functionality and improving readiness to deliver obstetric service, particularly in rural areas. The approach of linking health facility and household surveys described here could facilitate the tracking of progress towards quality obstetric care. PMID:29862026

  8. Psychological Readiness for Anterior Cruciate Ligament Surgery: Describing and Comparing the Adolescent and Adult Experiences

    PubMed Central

    Donald Shelbourne, K.; Gray, Tinker

    2003-01-01

    Objective: Our objectives were to describe the preoperative mood levels and psychological readiness levels of patients undergoing primary reconstruction of the anterior cruciate ligament (ACL) and to examine differences between adolescent and adult sports medicine patients relative to psychological readiness for ACL surgery. Design and Setting: Subjects prospectively completed assessments of preoperative mood and psychological readiness for ACL surgery and rehabilitation. Subjects: The sample consisted of subjects (N = 121) involved, on average, in sport or exercise participation 12.5 h/wk (SD = 7.5); subgroups included adolescents (15–19 years of age, n = 67) and adults (≥30 years of age, n = 32). Measurements: Subjects preoperatively provided self-reported assessments of demographics, mood disturbances, 10 psychological processes of change (consciousness raising, dramatic relief, environmental reevaluation, social liberation, self-reevaluation, counterconditioning, helping relationships, reinforcement management, stimulus control, and self-liberation), decisional balance (pros versus cons of surgery), and self-efficacy. Results: Relative to the first objective, subjects reported more pros than cons associated with surgery and relatively high levels of self-efficacy. Relative to the second objective, a significant main effect was noted (Wilks lambda = 0.58, P < .01), with 42% of the variance in the dependent variables being attributed to differences among adolescents as compared with adults. Follow-up analyses indicated that, as compared with adults, adolescents reported higher mood disturbances, more pros associated with surgery, and greater use of dramatic relief, environmental reevaluation, social liberation, helping relationships, and self-liberation. Conclusions: It may be advantageous to screen patients preoperatively relative to their psychological readiness for surgery and rehabilitation. Also, adolescents reported higher preoperative mood-disturbance levels than adults but higher levels of what would be considered “psychological readiness” for surgery. PMID:12937530

  9. Basic Measures of Progress.

    ERIC Educational Resources Information Center

    Calkins, Julia; Ling, Thomson; Moore, Eric; Halle, Tamara; Hair, Beth; Moore, Kris; Zaslow, Marty

    This document provides a compilation of measures of progress toward school readiness and three contributing conditions as used in several local, state, and national surveys. The report begins with a legend listing the surveys examined, their acronyms, and contact information. The remainder of the report, in tabular format, lists measures of…

  10. Family-Focused Workplace Guide.

    ERIC Educational Resources Information Center

    SERVE: SouthEastern Regional Vision for Education.

    The relationship between family and the workplace and the impact of both on school readiness are well documented. As society changes, home, work, and school relationships are being reassessed and retooled. Noting that employers are taking an increasing role in helping families cope with societal changes, this handbook offers information to…

  11. Guidelines for Psychological Practice With Older Adults

    ERIC Educational Resources Information Center

    American Psychologist, 2004

    2004-01-01

    Presents the American Psychological Association Guidelines for psychological practice with older adults. The present document is intended to assist psychologists in evaluating their own readiness for working clinically with older adults and in seeking and using appropriate education and training to increase their knowledge, skills, and experience…

  12. Mathematics Course Placement Using Holistic Measures: Possibilities for Community College Students

    ERIC Educational Resources Information Center

    Ngo, Federick; Chi, W. Edward; Park, Elizabeth So Yun

    2018-01-01

    Background/Context: Most community colleges across the country use a placement test to determine students' readiness for college-level coursework, yet these tests are admittedly imperfect instruments. Researchers have documented significant problems stemming from overreliance on placement testing, including placement error and misdiagnosis of…

  13. Preliminary Validation of a Readiness-to-Fly Assessment Tool for Use in Naval Aviation

    DTIC Science & Technology

    2010-05-25

    circulatory disease) Yes No Have you ever been diagnosed with any neurological syndrome, disorder, or injury? (e.g., migraines, epilepsy , or...sufficient? Yes No Females: Are you currently pregnant or lactating ? Yes No REPORT DOCUMENTATION PAGE The public reporting burden for

  14. Technology Solutions Case Study: Zero Energy Ready Home and the Challenge of Hot Water on Demand

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    Production builders in the Stapleton community of Denver, Colorado, now build 2,300-ft2 or larger homes that earn the U.S. Environmental Protection Agency (EPA) ENERGY STAR® through the Certified Homes Program, Version 3. These builders are repositioning to build comparably sized homes to the standards of the U.S. Department of Energy’s (DOE’s) Zero Energy Ready Home (ZERH) program. Most ZERH criteria align closely with ENERGY STAR and are familiar to these builders.

  15. Work readiness tools for young adults with chronic conditions.

    PubMed

    Metzinger, Courtney; Berg, Christine

    2015-01-01

    Young adults with chronic health conditions can experience barriers to work performance, ability, and their present and future worker roles. Work readiness resources can expand individuals' work skills, abilities, and interests. Five work readiness tools are presented (1) building an occupational profile, (2) generating environmental strategies, (3) on-the-job strategy use, and exploration of online tools (4) O*NET® and (5) O*NET® Interest Profiler, along with two theories (Knowles's Andragogy and Lawton's Ecological Model) to guide tool use. Use of these tools can assist young adults to better manage their health and expand their vocational identities for success at work. These approaches and tools support health professionals, community partners, and vocational organizations in their efforts to help young adults with chronic conditions.

  16. Predicting implementation from organizational readiness for change: a study protocol

    PubMed Central

    2011-01-01

    Background There is widespread interest in measuring organizational readiness to implement evidence-based practices in clinical care. However, there are a number of challenges to validating organizational measures, including inferential bias arising from the halo effect and method bias - two threats to validity that, while well-documented by organizational scholars, are often ignored in health services research. We describe a protocol to comprehensively assess the psychometric properties of a previously developed survey, the Organizational Readiness to Change Assessment. Objectives Our objective is to conduct a comprehensive assessment of the psychometric properties of the Organizational Readiness to Change Assessment incorporating methods specifically to address threats from halo effect and method bias. Methods and Design We will conduct three sets of analyses using longitudinal, secondary data from four partner projects, each testing interventions to improve the implementation of an evidence-based clinical practice. Partner projects field the Organizational Readiness to Change Assessment at baseline (n = 208 respondents; 53 facilities), and prospectively assesses the degree to which the evidence-based practice is implemented. We will conduct predictive and concurrent validities using hierarchical linear modeling and multivariate regression, respectively. For predictive validity, the outcome is the change from baseline to follow-up in the use of the evidence-based practice. We will use intra-class correlations derived from hierarchical linear models to assess inter-rater reliability. Two partner projects will also field measures of job satisfaction for convergent and discriminant validity analyses, and will field Organizational Readiness to Change Assessment measures at follow-up for concurrent validity (n = 158 respondents; 33 facilities). Convergent and discriminant validities will test associations between organizational readiness and different aspects of job satisfaction: satisfaction with leadership, which should be highly correlated with readiness, versus satisfaction with salary, which should be less correlated with readiness. Content validity will be assessed using an expert panel and modified Delphi technique. Discussion We propose a comprehensive protocol for validating a survey instrument for assessing organizational readiness to change that specifically addresses key threats of bias related to halo effect, method bias and questions of construct validity that often go unexplored in research using measures of organizational constructs. PMID:21777479

  17. JPSS-1 Algorithm Updates and upgrades

    NASA Astrophysics Data System (ADS)

    Weinrich, J. A.

    2017-12-01

    The National Oceanic and Atmospheric Administration (NOAA) is acquiring the next-generation weather and environmental satellite system, named the Joint Polar Satellite System (JPSS). The Suomi National Polar-orbiting Partnership (S-NPP) satellite was launched on 28 October, 2011, and is a pathfinder for JPSS and provides continuity for the NASA Earth Observation System and the NOAA Polar-orbiting Operational Environmental Satellite (POES) system. JPSS-1 is scheduled to launch in 2017. NASA is developing the Common Ground System which will process JPSS data and has the flexibility to process data from other satellites. This presentation will review the JPSS readiness from a Calibration/Validation perspective. Examples of JPSS Readiness will be presented including algorithm and table updates. The outcomes will show the Cal/Val planning as we going into Launch in 2017.

  18. Evaluation of the hygiene of ready-to-eat food preparation areas and practices in mobile food vendors in the UK.

    PubMed

    Little, Christine; Sagoo, Satnam

    2009-12-01

    This study was undertaken to assess the cleanliness of food preparation areas, cleaning methods used, and the microbiological quality of water used by 1258 mobile food vendors in the UK. Samples collected included potable water (1102), cleaning cloths (801) and environmental swabs from food preparation surfaces (2704). Cleaning cloths were more heavily contaminated with Aerobic Colony Counts, Enterobacteriaceae, Escherichia coli, and Staphylococcus aureus compared to surfaces sampled. Surfaces that were visually dirty, wet, and chopping boards that were plastic or damaged also had high levels of these bacteria. Fifty-four percent of potable water samples were of poor microbiological quality; i.e. contained coliforms, E. coli and/or enterococci. A documented food safety management system was only evident in 40.1% of vendors and cleaning schedules were only used by 43.6%. Deficiencies in the correct use of cleaning materials, such as dilution factors and the minimum contact time for disinfectants, were identified.

  19. Implementation of standardized nomenclature in the electronic medical record.

    PubMed

    Klehr, Joan; Hafner, Jennifer; Spelz, Leah Mylrea; Steen, Sara; Weaver, Kathy

    2009-01-01

    To describe a customized electronic medical record documentation system which provides an electronic health record, Epic, which was implemented in December 2006 using standardized taxonomies for nursing documentation. Descriptive data is provided regarding the development, implementation, and evaluation processes for the electronic medical record system. Nurses used standardized nursing nomenclature including NANDA-I diagnoses, Nursing Interventions Classification, and Nursing Outcomes Classification in a measurable and user-friendly format using the care plan activity. Key factors in the success of the project included close collaboration among staff nurses and information technology staff, ongoing support and encouragement from the vice president/chief nursing officer, the ready availability of expert resources, and nursing ownership of the project. Use of this evidence-based documentation enhanced institutional leadership in clinical documentation.

  20. The Importance of Time Management Skills for the Child or Adolescent with Learning Disabilities.

    ERIC Educational Resources Information Center

    Pisarchick, Sally E.

    This document discusses the importance of time management for learning-disabled students and techniques to enhance the teaching of time management skills. Teaching effective time management calls for consideration of the student's readiness to learn new material, effective transitions between activities, clear prioritization of educational…

  1. EUDISED Project: Present State and Development Prospects.

    ERIC Educational Resources Information Center

    Council for Cultural Cooperation, Strasbourg (France).

    A summary of the European Documentation and Information System for Education (EUDISED) March 1977 meeting describes the present state of the project and discussion of suggestions for future development. The preparatory phase of the project will be concluded in 1977 and ready for implementation; however, the present financial situation makes it…

  2. First Aid for Media-Aides.

    ERIC Educational Resources Information Center

    Cramer, Mary McCart

    This document was developed as part of a Research and Innovation Project by a Department of Defense Dependents School (DoDDS) Media Task Group in West Germany. Designed to provide a ready reference for noncertified personnel working in small school media centers, the monthly calendars (August through June) are intended to encourage an active…

  3. Listen to the Voices: School Counselors and Comprehensive School Counseling Programs

    ERIC Educational Resources Information Center

    Dahir, Carol A.; Burnham, Joy J.; Stone, Carolyn

    2009-01-01

    Presently, many state departments of education and school counselor associations have published second-generation documents aligned with the ASCA National Model[R] (American School Counselor Association, 2005). This research study analyzed some school counselors' readiness to deliver comprehensive programs by assessing their attitudes, beliefs,…

  4. Hispanic-Serving Institutions: Patterns, Predictions, and Implications for Informing Policy Discussions

    ERIC Educational Resources Information Center

    Torres, Vasti; Zerquera, Desiree

    2012-01-01

    This article seeks to identify and assess the readiness of "Potential" Hispanic-Serving Institutions (HSIs)--institutions located within Latino communities projected to increase the number of Latino/a high school graduates. Institutions are described based on evaluation of institutional missions, planning documents, programs, and marketing…

  5. Technical Manual. The ACT®

    ERIC Educational Resources Information Center

    ACT, Inc., 2014

    2014-01-01

    This manual contains technical information about the ACT® college readiness assessment. The principal purpose of this manual is to document the technical characteristics of the ACT in light of its intended purposes. ACT regularly conducts research as part of the ongoing formative evaluation of its programs. The research is intended to ensure that…

  6. Defining Integrated Student Supports for Linked Learning Pathways. Knowledge Brief

    ERIC Educational Resources Information Center

    John W. Gardner Center for Youth and Their Communities, 2016

    2016-01-01

    This document outlines how effectively integrated student supports build or scaffold student competencies in five broad domains of learning for college, career, and civic readiness. Relevant supports are not limited to "services" or "programs" but extend to enabling resources and social conditions, including, for example,…

  7. Contract Management Mentality--Are You Ready for the Spotlight?

    ERIC Educational Resources Information Center

    Whiddon, Philip

    1994-01-01

    Contract management of school maintenance and operations is a growing trend. In-house departments need to be prepared to justify their positions. Describes a Texas school district's request for proposal for contract management and includes the specifications for bidding with comments about the wording of the document. (MLF)

  8. Learning to Think in a Math Lab.

    ERIC Educational Resources Information Center

    Charbonneau, Manon P.

    This document begins with a discussion of the author's approach to instruction in a mathematics laboratory. This discussion includes an enumeration of types of desirable or necessary equipment and advice on the management of a laboratory. The author examines issues related to achievement and readiness for more traditional school experiences in…

  9. Agriculture. Access Skills. Vocational Readiness Skills. Missouri LINC. Assessing Vocational Education.

    ERIC Educational Resources Information Center

    Missouri Univ., Columbia. Dept. of Practical Arts and Vocational-Technical Education.

    This document contains agriculture occupations-related materials to help teachers and parents teach access skills to Missouri junior high and high school special needs students who want to pursue a vocational program in agribusiness, agricultural management, and economics; agriculture power, agricultural machinery, and small engine repair; or…

  10. 14 CFR 1216.319 - Environmental resources document.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... environmental resources document which describes the current environment at that field installation, including current information on the effects of NASA operations on the local environment. This document shall include information on the same environmental effects as included in an environmental impact statement...

  11. 14 CFR 1216.319 - Environmental resources document.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... environmental resources document which describes the current environment at that field installation, including current information on the effects of NASA operations on the local environment. This document shall include information on the same environmental effects as included in an environmental impact statement...

  12. Emotional, Cognitive and Self-Enhancement Processes in Aggressive Behavior After Interpersonal Rejection and Exclusion

    PubMed Central

    Rajchert, Joanna

    2015-01-01

    The relationship between exclusion or rejection and aggression is already well documented, but there is still a debate about the mechanisms that underlie this effect. In two studies we focused on the propensity to react aggressively (readiness for aggression) on the bases of emotional, cognitive or self-enhancement (personality-immanent) processes. In both studies we first measured readiness for aggression and then ego-depleted participants. Next, in Study 1 we excluded participants (n = 96) using an online ball throwing game and measured displaced aggressive behavior - intensity and duration of an unpleasant noise administrated to a stranger. In Study 2 participants (n = 140) were rejected by a peer on the basis of an interview that they gave and then could retaliate by reducing peer's chance for getting a job. The results show that exclusion effect on displaced aggression was moderated by cognitive readiness for aggression, while rejection effect on retaliatory aggression was shaped by emotional and personality-immanent readiness for aggression as well as ego-depletion. The results were discussed in light of the strength model of self-control by Baumeister, Vohs, and Tice (2007). PMID:27247687

  13. The 10 Conditions That Increased Vermont's Readiness to Implement Statewide Health System Transformation.

    PubMed

    Grembowski, David; Marcus-Smith, Miriam

    2018-06-01

    Following an arduous, 6-year policy-making process, Vermont is the first state implementing a unified, statewide all-payer integrated delivery system with value-based payment, along with aligned medical and social service reforms, for almost all residents and providers in a state. Commercial, Medicare, and Medicaid value-based payment for most Vermonters will be administered through a new statewide accountable care organization in 2018-2022. The purpose of this article is to describe the 10 conditions that increased Vermont's readiness to implement statewide system transformation. The authors reviewed documents, conducted internet searches of public information, interviewed key informants annually in 2014-2016, cross-validated factual and narrative interpretation, and performed content analyses to derive conditions that increased readiness and their implications for policy and practice. Four social conditions (leadership champions; a common vision; collaborative culture; social capital and collective efficacy) and 6 support conditions (money; statewide data; legal infrastructure; federal policy promoting payment reform; delivery system transformation aligned with payment reform; personnel skilled in system reform) increased Vermont's readiness for system transformation. Vermont's experience indicates that increasing statewide readiness for reform is slow, incremental, and exhausting to overcome the sheer inertia of large fee-based systems. The new payments may work because statewide, uniform population-based payment will affect the health care of almost all Vermonters, creating statewide, uniform provider incentives to reduce volume and making the current fee-based system less viable. The conditions for readiness and statewide system transformation may be more likely in states with regulated markets, like Vermont, than in states with highly competitive markets.

  14. Lightning Arrestor Connectors Production Readiness

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Marten, Steve; Linder, Kim; Emmons, Jim

    2008-10-20

    The Lightning Arrestor Connector (LAC), part “M”, presented opportunities to improve the processes used to fabricate LACs. The A## LACs were the first production LACs produced at the KCP, after the product was transferred from Pinnellas. The new LAC relied on the lessons learned from the A## LACs; however, additional improvements were needed to meet the required budget, yield, and schedule requirements. Improvement projects completed since 2001 include Hermetic Connector Sealing Improvement, Contact Assembly molding Improvement, development of a second vendor for LAC shells, general process improvement, tooling improvement, reduction of the LAC production cycle time, and documention of themore » LAC granule fabrication process. This report summarizes the accomplishments achieved in improving the LAC Production Readiness.« less

  15. Mechanization of Cataloging Procedures *

    PubMed Central

    Kilgour, Frederick G.

    1965-01-01

    The Columbia-Harvard-Yale Medical Libraries Computerization Project has put into operation its mechanized procedure for the production of catalog cards. Cards produced are in final form ready to be filed into a card catalog. Catalogers prepare copy on a worksheet from which punched cards are punched. An IBM 1401 computer processes the decklets of punched cards on magnetic tape to produce the expanded decklets of punched cards needed to print the various packs of catalog cards required to go into different catalogs. Next, the computer punches the expanded decklets of cards to operate an 870 Document Writer, which types out the catalog cards in final form. Cost of cards ready to file is 12.5 cents per card. Images PMID:14271110

  16. Crossing the barrier between the laboratory working model and the practicable production model

    NASA Astrophysics Data System (ADS)

    Curby, William A.

    1992-12-01

    Transforming apparatus that has developed into a successfully working laboratory system into a system that is ready, or nearly ready for production, distribution and general use is not always accomplished in a cost effective or timely fashion. Several design elements must be considered interactively during the planning, construction, use and servicing of the final production form of the system. The basic design elements are: Operating Specifications, Reliability Factors, Safety Factors, Precision Limits, Accuracy Limits, Uniformity Factors, Cost Limits and Calibration Requirements. Secondary elements including: Human Engineering, Documentation, Training, Maintenance, Proprietary Rights, Protection, Marketing, Replacement of Parts, and Packing and Shipping must also be considered during the transition.

  17. U.S. Army Human Capital Enterprise (HCE) ARFORGEN Data Management, Correlation, Integration and Synchronization Analysis

    DTIC Science & Technology

    2011-08-15

    system must, at a minimum, include  design and configuration  framework  supporting:  Part 1.   Net  Ready. The system must support  net ‐ centric operations...Analyze, evaluate and incorporate relevant DoD Architecture Framework . 5) Document standards for each task / condition combination. 6) Prepare final FAA...task  Analyze, evaluate and incorporate relevant Army Architecture Framework  Document standards for each task/condition combination forming

  18. Final Environmental Assessment for Construction and Operation of the Edgemeade Readiness Center and Tactical Unmanned Aerial System Storage and Maintenance Facility Idaho Army National Guard Elmore County, Idaho

    DTIC Science & Technology

    2010-07-01

    Edgemeade Readiness Center are public lands managed by the BLM. These areas are primarily composed of undeveloped basalt plains dominated by 4.0 Affected...areas where new buildings would be constructed. 4.10.2 Existing Conditions Basaltic formations in the general vicinity are in abundance. The Snake...River has cut down through many of these formations leaving basalt plains and terraces several hundred feet above the valley floor. Subsequently

  19. Systems Engineering Applied to the Development of a Wave Energy Farm.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Roberts, Jesse D.; Bull, Diana L.; Costello, Ronan Patrick

    A motivation for undertaking this stakeholder requirements analysis and Systems Engineering exercise is to document the requirements for successful wave energy farms to facilitate better design and better design assessments. A difficulty in wave energy technology development is the absence to date of a verifiable minimum viable product against which the merits of new products might be measured. A consequence of this absence is that technology development progress, technology value, and technology funding have largely been measured, associated with, and driven by technology readiness, measured in technology readiness levels (TRLs). Originating primarily from the space and defense industries, TRLs focusmore » on procedural implementation of technology developments of large and complex engineering projects, where cost is neither mission critical nor a key design driver. The key deficiency with the TRL approach in the context of wave energy conversion is that WEC technology development has been too focused on commercial readiness and not enough on the stakeholder requirements and particularly economic viability required for market entry.« less

  20. Orientation to Health Occupations: Year One Curriculum Guide.

    ERIC Educational Resources Information Center

    Idaho State Dept. of Education, Boise. Div. of Vocational Education.

    This Idaho state curriculum document for the first year of the secondary educations health occupations program contains the following introductory material: (1) a description of the program design; (2) a list of first-year areas of competency; (3) a foundation and job-readiness skills task list; and (4) a core curriculum task list. The curriculum…

  1. Trade and Technical Volumes I: Access Skills. Vocational Readiness Skills. Missouri LINC. Assessing Vocational Education.

    ERIC Educational Resources Information Center

    Missouri Univ., Columbia. Dept. of Practical Arts and Vocational-Technical Education.

    This document contains trade and industrial occupations-related materials to help teachers and parents teach access skills to Missouri junior high and high school special needs students who want to pursue a vocational program in carpentry; commercial art; drafting; electronics; heating, air conditioning, and refrigeration; or offset lithography…

  2. Directory of AFRL/HEA Technical Publications Submitted to DTIC from 1969 to 2007

    DTIC Science & Technology

    2007-09-01

    Research Division ( AFRL /HEA) 2004 to 30 September 1007 – Air Force Research Laboratory , Warfighter Readiness Research Division ( AFRL /HEA...NUMBER 2003 AIR FORCE RESEARCH LABORATORY WARFIGHTER TRAINING RESEARCH DIVISION ( AFRL /HEA) TECHNICAL DOCUMENTS AUTHOR(S) AFRL -HE-AZ-TP-2003...NUMBER WORK UNIT NUMBER 2002 AIR FORCE RESEARCH

  3. Assistant Secretary of Defense for Health Affairs--DoD. Final rule.

    PubMed

    1994-06-10

    This document revises the responsibilities, functions, relationships, and authorities of the Assistant Secretary of Defense for Health Affairs ASD(HA). The principal revision, the assignment of the Health Affairs functions under the Under Secretary of Defense for Personnel and Readiness is consistent with Section 903 of the FY 1994 Defense Authorization Act.

  4. National Assessments for Student Teachers: Documenting Teaching Readiness to the Tipping Point

    ERIC Educational Resources Information Center

    Margolis, Jason; Doring, Anne

    2013-01-01

    To evaluate the impact of the emergent national teacher performance assessment (TPA) on student teachers, this study examined a pilot implementation at one university in Washington State during Spring 2011. The qualitative research focused on the lived experience of those directly affected by TPA implementation: student teachers, mentor teachers,…

  5. Survey of Commercially Available Computer-Readable Bibliographic Data Bases.

    ERIC Educational Resources Information Center

    Schneider, John H., Ed.; And Others

    This document contains the results of a survey of 94 U. S. organizations, and 36 organizations in other countries that were thought to prepare machine-readable data bases. Of those surveyed, 55 organizations (40 in U. S., 15 in other countries) provided completed camera-ready forms describing 81 commercially available, machine-readable data bases…

  6. Preventing Preschool Fadeout through Instructional Intervention in Kindergarten and First Grade

    ERIC Educational Resources Information Center

    Duncan, Greg J.; Jenkins, Jade M.; Watts, Tyler W.; Magnuson, Katherine; Clements, Douglas; Sarama, Julie; Wolfe, Christopher B.; Spitler, Mary Elaine

    2015-01-01

    A substantial literature documents the benefits of early childhood education and formal preschool experiences on children's school readiness, with low-income and otherwise disadvantaged children benefitting the most from these programs. However, these academic benefits often fade out as children age, and most disappear by the end of kindergarten…

  7. Guide for the Preparation of Scientific Papers for Publication. Second Edition.

    ERIC Educational Resources Information Center

    Martinsson, Anders

    Updating a 1968 publication, this document presents rules and explanatory comments for use by authors and editors involved in the preparation of a scientific manuscript for professional typesetting prior to publication. It is noted that the guidelines should also be useful for authors producing camera-ready typescript with word processing…

  8. Assessment Issues in the Testing of Children at School Entry

    ERIC Educational Resources Information Center

    Rock, Donald A.; Stenner, A. Jackson

    2005-01-01

    The authors introduce readers to the research documenting racial and ethnic gaps in school readiness. They describe the key tests, including the Peabody Picture Vocabulary Test (PPVT), the Early Childhood Longitudinal Study (ECLS), and several intelligence tests, and describe how they have been administered to several important national samples of…

  9. Facing the World. An Independent Living/Pre-Employment Curriculum for Refugee Youths.

    ERIC Educational Resources Information Center

    Bateman, Mary Jo; And Others

    This document, a curriculum guide focusing on both independent living skills and job readiness skills, is based on the experience of the Bilingual Vocational Education program in Virginia. The lessons are sequenced to increase in difficulty as students acquire more English skills, but individual units do not necessarily require competencies…

  10. Engaging Educators: Common Core State Standards Implementation

    ERIC Educational Resources Information Center

    Achieve, Inc., 2011

    2011-01-01

    To date, 44 states and the District of Columbia have adopted the Common Core State Standards (CCSS). Achieve has prepared this planning document to help all states in the American Diploma Project Network (ADP) and the Partnership for Assessment of Readiness for College and Careers (PARCC) consortium engage educators in the essential work of…

  11. 78 FR 48727 - Proposed Revisions to Design of Structures, Components, Equipment and Systems

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-09

    ... Analysis Reports for Nuclear Power Plants: LWR Edition,'' Section 3.9.3 ``ASME Code Class 1, 2, and 3...'s Agencywide Documents Access and Management System (ADAMS): You may access publicly available... operational readiness of snubbers (ADAMS Accession No. ML070720041), and review interfaces have been updated...

  12. Development and Implementation of an Instructional Design for Effective Teaching of Ecosystem, Biodiversity, and Environmental Issues

    ERIC Educational Resources Information Center

    Yucel, Elif Ozata; Ozkan, Muhlis

    2015-01-01

    This study aims to develop an instructional design whereby ecosystem, biodiversity, and environmental issues are addressed with a holistic approach that provides more efficient teaching as well as to test the effectiveness of this design. A literature review was carried out and need-assessment was firstly made using the Readiness Test. This review…

  13. 75 FR 67996 - Environmental Documents Prepared for Proposed Oil, Gas, and Mineral Operations by the Gulf of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-04

    ... Environmental Documents Prepared for Proposed Oil, Gas, and Mineral Operations by the Gulf of Mexico Outer... regarding whether those effects have significant impacts. Environmental Assessments are used to evaluate.... ACTION: Notice of the Availability of Environmental Documents Prepared for OCS Mineral Proposals by the...

  14. Double shell tanks (DST) chemistry control data quality objectives

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BANNING, D.L.

    2001-10-09

    One of the main functions of the River Protection Project is to store the Hanford Site tank waste until the Waste Treatment Plant (WTP) is ready to receive and process the waste. Waste from the older single-shell tanks is being transferred to the newer double-shell tanks (DSTs). Therefore, the integrity of the DSTs must be maintained until the waste from all tanks has been retrieved and transferred to the WTP. To help maintain the integrity of the DSTs over the life of the project, specific chemistry limits have been established to control corrosion of the DSTs. These waste chemistry limitsmore » are presented in the Technical Safety Requirements (TSR) document HNF-SD-WM-TSR-006, Sec. 5 . IS, Rev 2B (CHG 200 I). In order to control the chemistry in the DSTs, the Chemistry Control Program will require analyses of the tank waste. This document describes the Data Quality Objective (DUO) process undertaken to ensure appropriate data will be collected to control the waste chemistry in the DSTs. The DQO process was implemented in accordance with Data Quality Objectives for Sampling and Analyses, HNF-IP-0842, Rev. Ib, Vol. IV, Section 4.16, (Banning 2001) and the U.S. Environmental Protection Agency EPA QA/G4, Guidance for the Data Quality Objectives Process (EPA 1994), with some modifications to accommodate project or tank specific requirements and constraints.« less

  15. Getting Ready for Inspection of Investigational Site at Short Notice

    PubMed Central

    Talele, Rajendra

    2010-01-01

    India is becoming an attractive destination for drug development and clinical research. This is evidenced by the three fold increment in clinical trial applications in last four years to the office of Drugs Controller General of India (DCGI). This upward trend is collaborative efforts of all stake holders and the quality of Indian data. Therefore to sustain this trend, it is important that stake holders such as Regulators, Sponsor, CRO, Monitor, Investigators and trial subjects required maintaining high standards of data and conduct of clinical trials. Indian regulations and the role of DCGI in quality check for Indian clinical trials is always a topic of discussion in various forums. A recent move by DCGI for conducting random inspections of investigational sites and companies at short notice, checking their compliance in accordance with the guidelines, and taking action against non-complier is welcomed. This will certainly increase over quality of the clinical trials. Quality of clinical trial conduct is measured on essential documents for their appropriateness and its correctness. It is observed that the stakeholders engaged in multitasking often overlook the requirements or appropriateness of the document due to their focused approach on a specific activity which is on priority. This can lead to serious quality problem and issues. Understanding of the process and documents reviewed by auditor is important to maintain such high quality. The proper planning and time management working on essential documents can minimize the quality issues, and we can be always ready for any type of inspection, announced or unannounced, or “short notice”. PMID:21829785

  16. Cueing cognitive flexibility: Item-specific learning of switch readiness.

    PubMed

    Chiu, Yu-Chin; Egner, Tobias

    2017-12-01

    The rich behavioral repertoire of the human species derives from our ability to flexibly reconfigure processing strategies (task sets) in response to changing requirements. This updating of task sets is effortful, as reflected by longer response times when switching a task than repeating it (switch costs). However, some recent data suggest that switch costs can be reduced by cueing switch readiness bottom-up, by associating particular stimuli with frequent switch requirements. This type of "stimulus-control (S-C) learning" would be highly adaptive, as it combines the speed of automatic (bottom-up) processing with the flexibility and generalizability of controlled (top-down) processing. However, it is unclear whether S-C learning of switch readiness is truly possible, and what the underlying mechanisms are. Here we address these questions by pairing specific stimuli with a need to update task-sets either frequently or rarely. In all 3 experiments, we observe robust item-specific switch probability (ISSP) effects as revealed by smaller switch costs for frequent switch items than for rare switch items. By including a neutral condition, we also show that the ISSP effect is primarily driven by S-C learning reducing switch costs in frequent switch items. Furthermore, by employing 3 tasks in Experiment 3, we establish that the ISSP effect reflects an enhancement of general switch readiness, rather than of the readiness to switch to a specific alternate task. These results firmly establish that switch readiness is malleable by item-specific S-C learning processes, documenting that a generalizable state of cognitive flexibility can be primed by a bottom-up stimulus. (PsycINFO Database Record (c) 2017 APA, all rights reserved).

  17. Evaluating the primary and ready biodegradability of dianilinodithiophosphoric acid.

    PubMed

    Lin, Weixiong; Sun, Shuiyu; Xu, Pingting; Dai, Yongkang; Ren, Jie

    2016-04-01

    Dianilinodithiophosphoric acid (DDA) is widely used as sulfide mineral flotation collector in China. It is necessary to investigate the biodegradability of DDA to provide the fundamental knowledge to assess the environmental fate in the risk assessment of DDA and to design and operate the DDA flotation wastewater biological treatment plant. In the present study, the primary and ready aerobic biodegradations of DDA were studied and the primary biodegradation kinetic model of DDA was developed. The results show that DDA displays a good primary biodegradability and its biodegradation ratio reaches 99.8 % in 7 days. In contrast, DDA is not easily ready biodegradable; hence, it is a partially biodegradable organic compound. The primary aerobic biodegradation kinetics can be described using the first-order reaction kinetics equation: C = 19.72191e(-0.01513t).

  18. 75 FR 16448 - Jordan Limited Partnership; Notice of Application Ready for Environmental Analysis and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-01

    ....O. Box 903, Gatlinburg, Tennessee 37738 (865) 436-0402. i. FERC Contact: Jeffrey Browning, (202) 502-8677 or jeffrey.browning@ferc.gov . j. Deadline for filing comments, recommendations, terms and...

  19. Environmental Assessment/Overseas Environmental Assessment for the F-35 Joint Strike Fighter Initial Operational Test and Evaluation

    DTIC Science & Technology

    2009-09-01

    NAS Lemoore; Yolk Field ANGB; Alpena 16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF 18. NUMBER 19a. NAME OF RESPONSIBLE PERSON a. REPORT...Currently identified preferred locations for conducting deployment demonstrations are Alpena Combat Readiness Training Center (CRTC), Michigan; Edwards...3-5 3.1.3 Deployment Demonstration Locations .............................................................3-5 3.1.3.1 Alpena Combat Range Test

  20. Improved Operational Readiness through Environmental Stress Screening

    DTIC Science & Technology

    1987-11-01

    Rhoades of Gru-,.:an’s Field Marketing Department, and the cooperation of the ni- merous Air Force logistics centers and operational facilities visited...EQUIPMENT AGE * ENVIRONMENTAL MAINTENANCE EFFECT PROFILES DtATA * TAILORING DEFINTION MET HOD1OLOGY I 1GUIDELINE oi FIELD ESS IMPLEMENTATION GUIDELINW...any mixing or mismatching appeared, the data was eliminated completely. Figure 5 provides the annual historical trends of each case history equipment

  1. Environmental Readiness for the 21st Century. The Eighth Annual National Report Card on Environmental Attitudes, Knowledge, and Behavior.

    ERIC Educational Resources Information Center

    National Environmental Education and Training Foundation, Washington, DC.

    The results of this survey are widely distributed to educators, policymakers, business executives, and the media to help America's leaders and the general public better understand what Americans know about the environment and how that knowledge relates to their attitudes and daily actions. The 1999 National Report Card examines the results of a…

  2. Project Summaries: Office of Basic Research Contract Program, 1989-1991

    DTIC Science & Technology

    1990-08-01

    OBJECTIVES: This research is an investigation of the impact of error in data on performance in a variety of tasks. While environmental uncertainty is...individual, organizational and environmental /situational factors impacting on senior decisions made a’ critical points in the Israeli events. A...making in the Army personnel system --predictors and measures of soldier performance --family impact on soldier retention and readiness Systems Research

  3. The New Youth Entrepreneur: Getting Ready for Entrepreneurship. Opportunities-They Are All Around You. Module 2.

    ERIC Educational Resources Information Center

    Kourilsky, Marilyn; And Others

    The New Youth Entrepreneur curriculum is a series of 12 youth-oriented educational modules containing instructional materials, learning activities, and checkup exercises designed to teach students key elements of entrepreneurship. This document is the second module, designed to help students define the notion of opportunity, determine sources of…

  4. Development of a Sex Education Programme for 12-Year-Old to 14-Year-Old Turkish Adolescents

    ERIC Educational Resources Information Center

    Cok, Figen; Gray, Lizbeth Ann

    2007-01-01

    Previous research has documented a need for the development of a sex education programme in Turkish schools in terms of adolescence readiness and the presence of misconceptions regarding critical aspects of sexual issues. Currently no school-based sex education is available for Turkish adolescents. This paper presents the development of a…

  5. Ready, Set, Read. Final Report.

    ERIC Educational Resources Information Center

    Bratton, Esther

    This document describes a project to develop and implement a curriculum to convince parents and caregivers of 3- and 4-year-olds how important it is for them to read to their children, to enhance their own reading skills, and to promote their confidence in instructing their children. The 16-page project report discusses the achievement of 4…

  6. The New Youth Entrepreneur: Getting Ready for Entrepreneurship. Business Ideas for All Communities. Module 3.

    ERIC Educational Resources Information Center

    Kourilsky, Marilyn; And Others

    The New Youth Entrepreneur curriculum is a series of 12 youth-oriented educational modules containing instructional materials, learning activities, and checkup exercises designed to teach students key elements of entrepreneurship. This document is the third module, which focuses on issues related to starting a business and providing ideas for…

  7. Trade and Technical. Volume II. Access Skills. Vocational Readiness Skills. Missouri LINC. Assessing Vocational Education.

    ERIC Educational Resources Information Center

    Missouri Univ., Columbia. Dept. of Practical Arts and Vocational-Technical Education.

    This document contains trade and industrial occupations-related materials to help teachers and parents teach access skills to Missouri junior high and high school special needs students who want to pursue a vocational program in auto body repair, auto mechanics, building maintenance and custodial work, diesel mechanics, machinist, small engine…

  8. The Effect of School Counselors' Domain Specialization on Seniors' Milestone Completion and College Access Planning

    ERIC Educational Resources Information Center

    Bond, Nancy J.

    2013-01-01

    The purpose of this study was to determine the effect of senior high school counselors' domain specializations--academic, advanced education, career, and personal/social--from two urban high schools, on alphabetically assigned graduating seniors' with low, mid-range, and high Grade Point Averages documented college and career readiness milestone…

  9. Effectiveness of Inquiry-Based Lessons Using Particulate Level Models to Develop High School Students' Understanding of Conceptual Stoichiometry

    ERIC Educational Resources Information Center

    Kimberlin, Stephanie; Yezierski, Ellen

    2016-01-01

    Students' inaccurate ideas about what is represented by chemical equations and concepts underlying stoichiometry are well documented; however, there are few classroom-ready instructional solutions to help students build scientifically accurate ideas about these topics central to learning chemistry. An intervention (two inquiry-based activities)…

  10. Community Colleges in the South: Strengthening Readiness and Pathways. The Report of the SREB Community College Commission

    ERIC Educational Resources Information Center

    Blanco, Cheryl; Spence, Dave

    2015-01-01

    Community colleges are vital to the states and the nation. The importance of community colleges as providers of postsecondary education and training is well documented. Fulfilling both economic and social roles, these institutions have successfully created new markets and empowered new populations through educational opportunity. This report…

  11. De Gustibus Non Disputandum (One does not Argue about Tastes).

    ERIC Educational Resources Information Center

    Strasheim, Lorraine A.

    Taking the epigrams of Martial and some of the reading notes from the Loeb Classical Library, this document presents classroom-ready readings on foods, including a menu excerpted from Martial and a series of two- to four-line epigrams on a variety of foods:peppers, beans, flour, beets, lettuce, turnips, leeks, cheese, sausage, eggs, bread,…

  12. Moving up the Ladder: How Do States Deliver Quality Improvement Supports within Their Quality Rating and Improvement Systems? Brief

    ERIC Educational Resources Information Center

    Holod, Aleksandra; Faria, Ann-Marie; Weinberg, Emily; Howard, Eboni

    2015-01-01

    As national attention has increasingly focused on the potential for high-quality early childhood education (ECE) to improve children's school readiness, states have developed quality rating and improvement systems (QRISs) to document the quality of ECE programs, support systematic quality improvement, and provide clear information to families…

  13. Military Preparedness

    DTIC Science & Technology

    2015-09-01

    United States Army War College Department of Command, Leadership, and Management Carlisle Barracks, Carlisle, PA Military Preparednessa Dr...The question seems a simple one at the national level, but in defense management practice it is actually two questions rolled into one, and the...documents, readiness management processes and systems assess those capabilities and aid in remedial action to correct deficiencies. The second question is

  14. Software Documentation for the Bartlesville Public Schools: Part One. The Bartlesville System Total Guidance Information Support System.

    ERIC Educational Resources Information Center

    Roberts, Tommy L.; And Others

    The Total Guidance Information Support System (TGISS), is an information storage and retrieval system for counselors. The total TGISS, including hardware and software, extends the counselor's capabilities by providing ready access to student information under secure conditions. The hardware required includes: (1) IBM 360/50 central processing…

  15. Enacting Critical Health Literacy in the Australian Secondary School Curriculum: The Possibilities Posed by e-Health

    ERIC Educational Resources Information Center

    McCuaig, Louise; Carroll, Kristie; Macdonald, Doune

    2014-01-01

    The teaching of health literacy in school-based health education (SBHE) is of international interest, yet there is less ready access to how conceptions of health literacy can be operationalised in school programmes. More specifically, while articulated in curriculum documents such as the incoming Australian Curriculum: Health and Physical…

  16. The Unlimited Potential of the Electronic Library (Except Where Prohibited by the Copyright Law).

    ERIC Educational Resources Information Center

    Schmidt, Steven; Lewis, David

    This paper describes the creation of a new library facility for Indiana University-Purdue University at Indianapolis, one designed ready to accommodate an infrastructure that would support the new technologies of the electronic information environment. Wiring and fiber-optic schemes are outlined briefly. The document is formatted as a script for…

  17. Educational Technology. Special Hearing before a Subcommittee of the Committee on Appropriations. United States Senate, One Hundred Fourth Congress, First Session.

    ERIC Educational Resources Information Center

    Congress of the U.S., Washington, DC. Senate Committee on Appropriations.

    This document presents witness testimony and supplemental materials from a Congressional hearing called to assess the effectiveness of federally funded educational technology programs, particularly Technology for Education, Star Schools, Ready to Learn Television, and Mathline. Other educational technologies were introduced at the hearing as well,…

  18. Briefs for Parents in Ready-To-Copy Form: English and Spanish. 1993 Compilation.

    ERIC Educational Resources Information Center

    Howley, Craig; Cahape, Pat

    This document contains English and Spanish versions of six one-page reports for parents. Each brief provides background, suggestions, and sources of further information on educational and child-rearing topics of common interest to parents. Titles are: "The Best and Worst of Times: Support Groups Help" ("Los tiempos mejores y peores: Los grupos…

  19. Estate and business planning for the retiring physician.

    PubMed

    Kingma, Kenneth W; Vaughn, Thomas D

    2012-01-01

    Retiring physicians have much to think about for estate planning purposes. The authors stand ready to help physicians sell or close their medical practice, navigate the 2010 Tax Act, take advantage of current planning opportunities, and prepare appropriate estate planning documents. Every estate is unique, so it is important to contact an estate planning advisor before taking any action.

  20. Challenges in Accessing Early Childhood Education and Care for Children in Refugee Families in Massachusetts

    ERIC Educational Resources Information Center

    Gross, Jeff; Ntagengwa, Christine

    2016-01-01

    For refugee households, stable child-care arrangements are a key underpinning of working parents' employment success and family self-sufficiency, and thus an important goal of refugee case management. Given the well-documented impact of early learning services on children's school readiness and long-term cognitive, socioemotional, and educational…

  1. Fostering and Eliciting Emergent Literacy Skills in Potentially English Proficient Students.

    ERIC Educational Resources Information Center

    Beers, Elizabeth A.

    This report describes an early intervention program to elicit emergent literacy skills in Potentially English Proficient kindergarten students. The school is located in a suburb of a large city near a naval base. The problem, lack of literacy readiness skills, was documented with a battery of tests given prior to entrance in kindergarten and the…

  2. Business and Office. Access Skills. Vocational Readiness Skills. Missouri LINC. Accessing Vocational Education.

    ERIC Educational Resources Information Center

    Missouri Univ., Columbia. Dept. of Practical Arts and Vocational-Technical Education.

    This document contains business and office occupations-related materials to help teachers and parents teach access skills to Missouri junior high and high school special needs students who want to pursue a vocational program in secretarial and office technology, bookkeeping, accounting, and payroll, or data entry. Access skills are defined as…

  3. Regional Child Care Trends: Comparing Georgia to Its Neighbors.

    ERIC Educational Resources Information Center

    Waits, Lauren; Monaco, Malina; Beck, Lisa; Edwards, Jennifer

    As child care becomes an increasingly important public policy issue on the national level, there is emerging concern about Georgia's readiness to meet the needs of its children in care. This study documented the state of child care in Georgia in comparison to other states, to national averages, and to national standards. A group of 12 comparison…

  4. Environmental contamination of ready meals by polychlorinated biphenyls (PCBs).

    PubMed

    Adenugba, Adeola A; McMartin, Dena W; Beck, Angus

    2012-01-01

    The level of polychlorinated biphenyls (PCBs) contamination in ready meals was investigated to determine exposure compared to other foodstuffs. Chilled ready meals from nine categories (ambient, Chinese, Indian, Traditional UK, Italian, American Tex-Mex, Vegetarian and Organic), and three samples within each category were Soxhlet extracted in triplicate with hexane for 24 h, followed by a clean-up on deactivated silica gel. The cleaned extracts were concentrated to 1 ml under N(2) gas and analyzed on gas chromatography mass spectrometry (GC-MS) for 7 target PCBs (congeners 28, 52, 101, 118, 153, 138, and 180). Individual congener concentrations ranged from non-detectable to 0.40 ng g(-1) (wet weight). The cumulative concentration of all congeners (ΣPCBs) ranged between 0.20 and 1.00 ng g(-1) (wet weight). These values translate into exposure levels of less than 1 μg kg(-1)day(-1) for reference men and women of 70 and 57 kg, respectively. This preliminary study demonstrates that ready meals, like many other foods, are contaminated by PCBs and may represent an important route of human exposure given contemporary changes in consumer food choice. Even though low levels of contamination were observed, long-term exposure for population groups consuming a high volume of ready meals may have cause for concern regarding chronic health risks.

  5. 75 FR 40798 - City of Seattle; Notice of Application Ready for Environmental Analysis and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-14

    ...; (10) six horseshoe-shaped transformer bays; (11) six individual three-phase, 230-kilovolt (kV...-up transformer replacements. m. Locations of the Application: A copy of the application is available...

  6. PROTOCOL FOR VERIFICATION OF URBAN RUNOFF MODELS

    EPA Science Inventory

    The ETV program was created by the USEPA to accelerate the marketplace acceptance of commercial-ready environmental technologies. This objective will be achieved by conducting credible third-party performance assessments and reporting the results. Access to this data allows users...

  7. 75 FR 62518 - Northern Illinois Hydropower, LLC; Notice of Application Ready for Environmental Analysis and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-12

    ... Hydropower, LLC, 801 Oakland Avenue, Joliet, IL 60435, (312) 320-1610. i. FERC Contact: Janet Hutzel, (202) 502-8675 or janet[email protected] . j. Deadline for filing comments, recommendations, terms and...

  8. Plain Language in Environmental Policy Documents: An Assessment of Reader Comprehension and Perceptions

    ERIC Educational Resources Information Center

    Jones, Natasha; McDavid, Justin; Derthick, Katie; Dowell, Randy; Spyridakis, Jan

    2012-01-01

    Several government agencies are seeking quality improvement in environmental policy documents by asking for the implementation of Plain Language (PL) guidelines. Our mixed-methods research examines whether the application of certain PL guidelines affects the comprehension and perceptions of readers of environmental policy documents. Results show…

  9. 36 CFR 218.25 - Comments on proposed projects and activities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) Comments on a proposed project or activity to be documented in an environmental assessment shall be...) Comments on a proposed project or activity to be documented in an environmental impact statement shall be... proposed project or activity to be documented with an environmental assessment shall not be extended. (2...

  10. 36 CFR 218.25 - Comments on proposed projects and activities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) Comments on a proposed project or activity to be documented in an environmental assessment shall be...) Comments on a proposed project or activity to be documented in an environmental impact statement shall be... proposed project or activity to be documented with an environmental assessment shall not be extended. (2...

  11. 41 CFR 51-7.3 - Ensuring environmental documents are actually considered in agency determinations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... contains requirements to ensure adequate consideration of environmental documents in agency decision-making... environmental documents as a part of their decision-making: (1) Action: Request. (2) Start of NEPA process: Upon... Property Management Other Provisions Relating to Public Contracts COMMITTEE FOR PURCHASE FROM PEOPLE WHO...

  12. KSC-99pp0417

    NASA Image and Video Library

    1999-04-17

    Center Director Roy Bridges (right) gets ready to drive an electric car, provided by Florida Power & Light, to the opening of Environmental and Energy Awareness Week at the Kennedy Space Center Visitor Complex. Exhibits and displays by KSC and 45th Space Wing organizations detail accomplishments in minimizing environmental impacts and conserving resources. They are on view April 19 22 at various sites at KSC, Cape Canaveral Air Station and Patrick Air Force Base

  13. End State Condition Report for Materials and Fuels Complex Facilities MFC-799, 799A, and 770C

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gary Mecham

    2010-10-01

    The Materials and Fuels Complex (MFC) facilities MFC-799, “Sodium Processing Facility” (a single building consisting of two areas: the Sodium Process Area and the Carbonate Process Area); MFC-799A, “Caustic Storage Area;” and MFC-770C, “Nuclear Calibration Laboratory,” have been declared excess to future Department of Energy (DOE) Office of Nuclear Energy(NE) mission requirements. Transfer of these facilities from NE to the DOE Office of Environmental Management (EM), and an associated schedule for doing so, have been agreed upon by the two offices. This report documents the completion of pre-transfer stabilization actions, as identified in DOE Guide 430.1-5, “Transition Implementation Guide,” formore » buildings MFC-799/799A and 770C, and indicates that these facilities are ready for transfer from NE to EM. The facilities are in a known, safe condition and information is provided to support efficient decommissioning and demolition (D&D) planning while minimizing the possibility of encountering unforeseen circumstances during the D&D activities.« less

  14. Hanford Site National Environmental Policy Act (NEPA) Characterization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Neitzel, Duane A.; Antonio, Ernest J.; Eschbach, Tara O.

    2001-09-01

    This document describes the U.S. Department of Energy's (DOE) Hanford Site environment. It is updated each year and is intended to provide a consistent description of the Hanford Site environment for the many National Environmental Policy Act (NEPA) documents being prepared by DOE contractors. No statements of significance or environmental consequences are provided. This year's report is the thirteenth revision of the original document published in 1988 and is (until replaced by the fourteenth revision) the only version that is relevant for use in the preparation of Hanford NEPA, State Environmental Policy Act (SEPA), and Comprehensive Environmental Response, Compensation, andmore » Liability Act (CERCLA) documents. The two chapters included in this document (Chapters 4 and 6) are numbered to correspond to the chapters where such information is typically presented in environmental impact statements (Weiss) and other Hanford Site NEPA or CERCLA documentation. Chapter 4.0 (Affected Environment) describes Hanford Site climate and meteorology, geology, hydrology, ecology, cultural, archaeological, and historical resources, socioeconomics, occupational safety, and noise. Chapter 6.0 (Statutory and Regulatory Requirements) describes federal and state laws and regulations, DOE directives and permits, and presidential executive orders that are applicable to the NEPA documents prepared for Hanford Site activities.« less

  15. Hanford Site National Environmental Policy Act (NEPA) Characterization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Neitzel, Duane A.; Bunn, Amoret L.; Duncan, Joanne P.

    2002-09-01

    This document describes the U.S. Department of Energy's (DOE) Hanford Site environment. It is updated each year and is intended to provide a consistent description of the Hanford Site environment for the many National Environmental Policy Act (NEPA) documents being prepared by DOE contractors. No statements of significance or environmental consequences are provided. This year's report is the thirteenth revision of the original document published in 1988 and is (until replaced by the fourteenth revision) the only version that is relevant for use in the preparation of Hanford NEPA, State Environmental Policy Act (SEPA), and Comprehensive Environmental Response, Compensation, andmore » Liability Act (CERCLA) documents. The two chapters included in this document (Chapters 4 and 6) are numbered to correspond to the chapters where such information is typically presented in environmental impact statements (Weiss) and other Hanford Site NEPA or CERCLA documentation. Chapter 4.0 (Affected Environment) describes Hanford Site climate and meteorology, geology, hydrology, ecology, cultural, archaeological, and historical resources, socioeconomics, occupational safety, and noise. Chapter 6.0 (Statutory and Regulatory Requirements) describes federal and state laws and regulations, DOE directives and permits, and presidential executive orders that are applicable to the NEPA documents prepared for Hanford Site activities.« less

  16. Hanford Site National Environmental Policy Act (NEPA) Characterization, Revision 15

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Neitzel, Duane A.; Bunn, Amoret L.; Burk, Kenneth W.

    2003-09-01

    This document describes the U.S. Department of Energy's (DOE) Hanford Site environment. It is updated each year and is intended to provide a consistent description of the Hanford Site environment for the many National Environmental Policy Act (NEPA) documents being prepared by DOE contractors. No statements of significance or environmental consequences are provided. This year's report is the thirteenth revision of the original document published in 1988 and is (until replaced by the fourteenth revision) the only version that is relevant for use in the preparation of Hanford NEPA, State Environmental Policy Act (SEPA), and Comprehensive Environmental Response, Compensation, andmore » Liability Act (CERCLA) documents. The two chapters included in this document (Chapters 4 and 6) are numbered to correspond to the chapters where such information is typically presented in environmental impact statements (Weiss) and other Hanford Site NEPA or CERCLA documentation. Chapter 4.0 (Affected Environment) describes Hanford Site climate and meteorology, geology, hydrology, ecology, cultural, archaeological, and historical resources, socioeconomics, occupational safety, and noise. Chapter 6.0 (Statutory and Regulatory Requirements) describes federal and state laws and regulations, DOE directives and permits, and presidential executive orders that are applicable to the NEPA documents prepared for Hanford Site activities.« less

  17. 78 FR 42070 - Announcement of the Board of Directors for the National Environmental Education Foundation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-15

    ..., World Affairs Council, Boy Scouts of America, Alliance for the Family, the Ready to Learn Partnership and the Latino Advisory Council of the Boys and Girls Club of America. Mr. Alcazar earned a bachelor's...

  18. Critical Readiness Review EHS Water Quality and Microbiology

    NASA Technical Reports Server (NTRS)

    Woo, Cindy

    2010-01-01

    Presentation reviews the status in reference to the Environmental, Health and Safety (EHS) of the water quality and microbiology for the International Space Station. It includes information about crew training, hardware delivery, and those items that will be returned for study.

  19. Transition to blended learning: experiences from the first year of our blended learning Bachelor of Nursing Studies programme.

    PubMed

    Sweeney, Mary-Rose; Kirwan, Anne; Kelly, Mary; Corbally, Melissa; O Neill, Sandra; Kirwan, Mary; Hourican, Susan; Matthews, Anne; Hussey, Pamela

    2016-10-01

    The School of Nursing at Dublin City University offered a new blended learning Bachelor of Nursing Studies programme in the academic year 2011. To document the experiences of the academic team making the transition from a face-to-face classroom-delivered programme to the new blended learning format. Academics who delivered the programme were asked to describe their experiences of developing the new programme via two focus groups. Five dominant themes were identified: Staff Readiness; Student Readiness; Programme Delivery and Student Engagement; Assessment of Module Learning Outcomes and Feedback; and Reflecting on the First Year and Thinking of the Future. Face-to-face tutorials were identified as very important to both academics and students. Reservations about whether migrating the programme to an online format encouraged students to engage in additional practices of plagiarism were expressed by some. Student ability/readiness to engage with technology-enhanced learning was an important determinant of their own success academically. In the field of nursing blended learning is a relatively new and emerging field which will require huge cultural shifts for staff and students alike.

  20. Reaching for Higher Standards: 1992. South Carolina Reports on Progress toward the National Education Goals.

    ERIC Educational Resources Information Center

    South Carolina Governor's Office, Columbia.

    This document describes South Carolina's progress during 1991-92 toward achieving the six National Education Goals, first formulated at a meeting between the U.S. president and the 50 state governors in September, 1989. The goals, which are listed at the beginning of this report, are targeted respectively at: (1) school readiness; (2) school…

  1. Options for Improving the Military Child Care System. Occasional Paper Summary

    ERIC Educational Resources Information Center

    Zellman, Gail L.; Gates, Susan M.; Cho, Michelle; Shaw, Rebecca

    2008-01-01

    This document summarizes a report that questions whether the current U.S. Department of Defense (DoD) system of in-kind subsidies for child care is meeting DoD recruitment, readiness, and retention goals or service member needs in an optimal way. DoD appears to be reaping limited benefits from the substantial subsidies provided to families that…

  2. Are Mentors Ready To Make a Difference? A Survey of Mentors' Attitudes towards Nurse Education.

    ERIC Educational Resources Information Center

    Pulsford, David; Boit, Kath; Owen, Sharon

    2002-01-01

    Responses from 198 of 400 British nurses who mentor students showed that mentors felt supported by colleagues but less so by managers or universities. They wanted more time for mentoring, closer links with the universities, and better assessment documentation. Mentor update sessions were often not attended, due to staff shortages or lack of…

  3. InTASC Model Core Teaching Standards and Learning Progressions for Teachers 1.0: A Resource for Ongoing Teacher Development

    ERIC Educational Resources Information Center

    Council of Chief State School Officers, 2013

    2013-01-01

    The Council of Chief State School Officers (CCSSO), through its Interstate Teacher Assessment and Support Consortium (InTASC), offers this set of combined resources that define and support ongoing teacher effectiveness to ensure students reach college and career ready standards. This document includes the "InTASC Model Core Teaching…

  4. Financing Your Future: Journey to Your Dreams. Get Ready!

    ERIC Educational Resources Information Center

    Minnesota Higher Education Services Office, 2004

    2004-01-01

    This document is a user-friendly student workbook which teaches students how to save money so that they will be able to afford college. It guides six fictional students through chapters about how to earn, save, and budget their money. It makes the connection between having college as a goal, preparing for it financially over the long term, and…

  5. Evaluation of Flowable Fill Surface Performance

    DTIC Science & Technology

    2016-11-01

    Army position unless so designated by other authorized documents. DESTROY THIS REPORT WHEN NO LONGER NEEDED. DO NOT RETURN IT TO THE ORIGINATOR...33 viii Preface This study was conducted for the U.S. Air Force’s (USAF) pavement evaluation teams, contingency readiness groups, base civil...engineers, major command pavement engineers, Rapid Engineer Deployable Heavy Operational Repair Squadron Engineer (RED HORSE) squadrons, and Prime Base

  6. EP-DRAFT-1.1 2014-01-19 OSI-GAM-SOP-00x In Situ High-resolution Gamma Spectroscopy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wimer, N. G.; Kreek, S. A.

    2014-01-27

    The standard operating procedure is described for in situ high-resolution gamma spectroscopy, including operational readiness, planning, preparation, conduct, and reporting. Data analysis of in situ gamma spectrum files will be performed together with those of other gamma assay methods by a dedicated Data Analysis process, documented in companion OSI procedures.

  7. Development of TOPS

    NASA Astrophysics Data System (ADS)

    Tanaka, Yoshiyuki; Tsugiishi, Shigemi

    The off-line patent and utility model information management system at Teijin Ltd. had been developed and operated since 1980. To achieve efficient business management through office automation and to get ready for easy access to electronic document delivery so-called Paperless project being developed by Japan Patent Office, the system was reviewed and new online system was constructed in 1985. The paper describes its details.

  8. Army Strong: Equipped, Trained and Ready. Final Report of the 2010 Army Acquisition Review

    DTIC Science & Technology

    2011-01-01

    program execution. Why is there such enduring dissatisfaction with DoD acquisition by leaders, workforce, customers and taxpayers? Succinctly...documentation; counterproductive, costly government and industry overhead; and increasingly dissatisfied customers . Even with a laborious requirements...retired, operating and generating force, customers and suppliers. The panel is grateful to all those interviewed for their time, insight, and service

  9. Promoting Low-Income Students' College Readiness, Well-Being, and Success: A GEAR UP Counseling Program Study

    ERIC Educational Resources Information Center

    Capizzi, Lorri M.; Hofstetter, Carolyn Huie; Mena, Dolores D.; Duckor, Brent; Hu, Xiaolu

    2017-01-01

    This article documents narrative experiences from alumni who participated in the GEAR UP program. The San Jose State University GEAR UP program, based on an intensive counseling model, is grounded in social capital and resilience theories, and is designed to increase the number of low-income students who are prepared to enter and succeed in…

  10. A Cultural Communities Approach to Understanding Head Start Teachers' Beliefs about Language Use with Dual Language Learners: Implications for Practice

    ERIC Educational Resources Information Center

    Garrity, Sarah; Guerra, Alison Wishard

    2015-01-01

    The school-readiness gap for Latino dual language learners in the United States has been well documented, despite a strong research base highlighting effective strategies and practices for supporting their academic success. However, current educational practices reflect the hegemonic discourse that, because the United States is an English-speaking…

  11. Technology Readiness Assessment (TRA) Deskbook

    DTIC Science & Technology

    2009-07-01

    Document CDER Center for Drug Evaluation and Research CDR Critical Design Review CDRH Center for Devices and Radiologic Health CFD computational fluid...gational Device Exemption (IDE) meeting is held with Center for Devices and Radiological Health ( CDRH ) for proposed Class III devices, and the IDE...is prepared and submitted to CDRH . For a 510(k), determine substantially equivalent devices and their classification, validate func- tioning model

  12. An analysis of teacher’s preparation in implementing 2013 revision edition curriculum on mathematics specialization learning

    NASA Astrophysics Data System (ADS)

    Susilo, T.; Suryawan, A.

    2018-05-01

    This study aimed to determine the pedagogical competence of teachers, the readiness of planning and implementation of learning related to the implementation 2013 revised edition curriculum on mathematics specialization learning for senior high schools Wonogiri. Informants in this study there are 6 high school mathematics teachers X and XI class who teach in the school district Wonogiri. Data were collected using questionnaire method, interview, observation and documentation. Qualitative data analysis is done interactively through 4 paths: data collection, data reduction, data display, drawing conclusion. The results showed that high school mathematics teacher class X and XI in school district of Wonogiri City. The results show that most high school mathematics teachers in grade X and XI are ready to implement the 2013 revised edition curriculum and a few have not been able to implement due to internal or external factors. High school math teachers at Wonogiri district who are ready to face the 2013 revised edition curriculum have applied 10 teacher pedagogic competency indicators according to Regulation of the national education ministry Number 16 Year 2007 in learning. The readiness and implementation of mathematics learning is in line with the demands of the 2013 revised edition curriculum. Based on the teachers who are not ready, data on issues that arise in the implementation of the 2013 revised edition curriculum. Especially the problems in learning, namely mismatch of Core Competence (KI) and Basic Competence (KD) in teacher manual, material disregard in student handbook and lack of examples of problems that exist in teacher manual.

  13. 76 FR 54782 - Environmental Documents Prepared for Proposed Oil, Gas, and Mineral Operations by the Gulf of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-02

    ... Environmental Documents Prepared for Proposed Oil, Gas, and Mineral Operations by the Gulf of Mexico Outer..., Interior. ACTION: Notice of the Availability of Environmental Documents Prepared for OCS Mineral Proposals by the Gulf of Mexico OCS Region. SUMMARY: The Bureau of Ocean Energy Management, Regulation and...

  14. 75 FR 67994 - Environmental Documents Prepared for Proposed Oil, Gas, and Mineral Operations by the Gulf of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-04

    ... Environmental Documents Prepared for Proposed Oil, Gas, and Mineral Operations by the Gulf of Mexico Outer..., Interior. ACTION: Notice of the availability of environmental documents prepared for OCS mineral proposals by the Gulf of Mexico OCS Region. SUMMARY: The Bureau of Ocean Energy Management, Regulation and...

  15. 76 FR 16632 - Environmental Documents Prepared for Proposed Oil, Gas, and Mineral Operations by the Gulf of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-24

    ... Environmental Documents Prepared for Proposed Oil, Gas, and Mineral Operations by the Gulf of Mexico Outer...: Notice of the Availability of Environmental Documents Prepared for OCS Mineral Proposals by the Gulf of Mexico OCS Region. SUMMARY: The Bureau of Ocean Energy Management, Regulation and Enforcement (BOEMRE...

  16. 76 FR 38673 - Environmental Documents Prepared for Proposed Oil, Gas, and Mineral Operations by the Gulf of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-01

    ... Environmental Documents Prepared for Proposed Oil, Gas, and Mineral Operations by the Gulf of Mexico Outer..., Interior. ACTION: Notice of the availability of environmental documents prepared for OCS mineral proposals by the Gulf of Mexico OCS Region. SUMMARY: The Bureau of Ocean Energy Management, Regulation and...

  17. 25 CFR 559.7 - May the Chairman request Indian lands or environmental and public health and safety documentation...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... and public health and safety documentation regarding any gaming place, facility, or location where... environmental and public health and safety documentation regarding any gaming place, facility, or location where gaming will occur? A tribe shall provide Indian lands or environmental and public health and safety...

  18. 12 CFR 408.5 - Ensuring environmental documents are actually considered in Agency decision-making.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... considered in Agency decision-making. 408.5 Section 408.5 Banks and Banking EXPORT-IMPORT BANK OF THE UNITED... Procedures § 408.5 Ensuring environmental documents are actually considered in Agency decision-making... environmental documents in agency decision-making. To implement these requirements, Eximbank officials will: (a...

  19. 25 CFR 559.7 - May the Chairman request Indian lands or environmental and public health and safety documentation...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... and public health and safety documentation regarding any gaming place, facility, or location where... environmental and public health and safety documentation regarding any gaming place, facility, or location where gaming will occur? A tribe shall provide Indian lands or environmental and public health and safety...

  20. 25 CFR 559.7 - May the Chairman request Indian lands or environmental and public health and safety documentation...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... and public health and safety documentation regarding any gaming place, facility, or location where... environmental and public health and safety documentation regarding any gaming place, facility, or location where gaming will occur? A tribe shall provide Indian lands or environmental and public health and safety...

  1. 32 CFR 187.5 - Responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE ENVIRONMENT ENVIRONMENTAL EFFECTS ABROAD...) Maintain liaison with the Council on Environmental Quality with respect to environmental documents; (4... and consider environmental documents when required by this directive for proposed actions within their...

  2. International Space Station Requirement Verification for Commercial Visiting Vehicles

    NASA Technical Reports Server (NTRS)

    Garguilo, Dan

    2017-01-01

    The COTS program demonstrated NASA could rely on commercial providers for safe, reliable, and cost-effective cargo delivery to ISS. The ISS Program has developed a streamlined process to safely integrate commercial visiting vehicles and ensure requirements are met Levy a minimum requirement set (down from 1000s to 100s) focusing on the ISS interface and safety, reducing the level of NASA oversight/insight and burden on the commercial Partner. Partners provide a detailed verification and validation plan documenting how they will show they've met NASA requirements. NASA conducts process sampling to ensure that the established verification processes is being followed. NASA participates in joint verification events and analysis for requirements that require both parties verify. Verification compliance is approved by NASA and launch readiness certified at mission readiness reviews.

  3. Cielo Computational Environment Usage Model With Mappings to ACE Requirements for the General Availability User Environment Capabilities Release Version 1.1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vigil,Benny Manuel; Ballance, Robert; Haskell, Karen

    Cielo is a massively parallel supercomputer funded by the DOE/NNSA Advanced Simulation and Computing (ASC) program, and operated by the Alliance for Computing at Extreme Scale (ACES), a partnership between Los Alamos National Laboratory (LANL) and Sandia National Laboratories (SNL). The primary Cielo compute platform is physically located at Los Alamos National Laboratory. This Cielo Computational Environment Usage Model documents the capabilities and the environment to be provided for the Q1 FY12 Level 2 Cielo Capability Computing (CCC) Platform Production Readiness Milestone. This document describes specific capabilities, tools, and procedures to support both local and remote users. The model ismore » focused on the needs of the ASC user working in the secure computing environments at Lawrence Livermore National Laboratory (LLNL), Los Alamos National Laboratory, or Sandia National Laboratories, but also addresses the needs of users working in the unclassified environment. The Cielo Computational Environment Usage Model maps the provided capabilities to the tri-Lab ASC Computing Environment (ACE) Version 8.0 requirements. The ACE requirements reflect the high performance computing requirements for the Production Readiness Milestone user environment capabilities of the ASC community. A description of ACE requirements met, and those requirements that are not met, are included in each section of this document. The Cielo Computing Environment, along with the ACE mappings, has been issued and reviewed throughout the tri-Lab community.« less

  4. Coordinated bird monitoring: Technical recommendations for military lands

    USGS Publications Warehouse

    Bart, Jonathan; Manning, Ann; Fischer, Richard; Eberly, Chris

    2012-01-01

    The Department of Defense (DoD) is subject to several rules and regulations establishing responsibilities for monitoring migratory birds. The Sikes Act requires all military installations with significant natural resources to prepare and implement Integrated Natural Resources Management Plans (INRMPs). These plans guide the conservation and long-term management of natural resources on military lands in a manner that is compatible with and sustains the military mission. An INRMP also supports compliance with all legal requirements and guides the military in fulfilling its obligation to be a good steward of public land.The management and conservation of migratory birds is addressed in installation INRMPs. The National Environmental Policy Act (NEPA) requires federal agencies to evaluate and disclose the potential environmental impacts of their proposed actions. More recently, DoD signed an MOU (http://www.dodpif.org/downloads/EO13186_MOU-DoD.pdf) for migratory birds, under Executive Order 13186, with the US Fish and Wildlife Service (USFWS) in July 2006 and a Migratory Bird Rule (http://www.dodpif.org/downloads/MigBirdFINALRule_FRFeb2007.pdf) was passed by Congress in February 2007. The Migratory Bird Rule addresses the potential impacts of military readiness activities on populations of migratory birds and establishes a process to implement conservation measures if and when a military readiness activity is expected to have a significant adverse impact on a population of migratory bird species (as determined through the NEPA process). The MOU states that for nonmilitary readiness activities, prior to initiating any activity likely to affect populations of migratory birds DoD shall (1) identify the migratory bird species likely to occur in the area of the proposed action and determine if any species of concern could be affected by the activity, and (2) assess and document, using NEPA when applicable, the effect of the proposed action on species of concern. By following these procedures, DoD will minimize the possibility for a proposed action to unintentionally take migratory birds at a level that would violate any of the migratory bird treaties and potentially impact mission activities. In addition, implementing conservation and monitoring programs for migratory birds supports the ecosystem integrity necessary to sustain DoD's natural resources for the military mission.Non-compliance with the procedural requirements of the MBTA could result in a private party lawsuit under the Administrative Procedures Act (APA). A lawsuit filed under APA involving a Navy bombing range is the basis for a court ruling that unintentional take of migratory birds applies to federal actions. Ensuring the necessary data is available to adequately assess impacts of a proposed action will help avoid lawsuits or help ensure such lawsuits have no grounds. The data gathered in a bird monitoring program will provide the best scientific data available to assess the expected impacts of a proposed action on migratory bird species through the NEPA process. This report presents recommendations developed by the U.S. Geological Survey (USGS) for the Department of Defense (DoD) on establishing a "Coordinated Bird Monitoring (CBM) Plan." The CBM Plan is intended to ensure that DoD meets its conservation and regulatory responsibilities for monitoring birds (Chapter 1). The report relies heavily on recommendations in the report, "Opportunities for improving avian monitoring" (http://www.nabci-us.org/aboutnabci/monitoringreportfinal0307.pdf), by the U.S. North American Bird Conservation Initiative (U.S. NABCI Monitoring Subcommittee, 2007) and on a review of 358 current DoD bird monitoring programs carried out as part of this project (Chapter 2). This report contains 12 recommendations which, if followed, would result in a comprehensive, efficient, and useful approach to bird monitoring. The recommendations are based on the entire report but are presented together at the end of Chapter 1. DoD has agreed to consider implementing these recommendations; however, final decisions will be based upon such factors as the availability of resources and military mission considerations. These recommendations from USGS can be summarized into 6 major themes: A major report on monitoring was released in 2007 by the U.S. North American Bird Conservation Initiative (http://www.nabci-us.org/main2.html). DoD can be consistent with this report by establishing policy that monitoring will be explicitly acknowledged as an integral element of bird management and conservation (Recommendation 1). The design of monitoring and assessment programs for birds should include the following steps: Preparation of a document describing the program's goals, objectives, and methods similar to a format we provide (Recommendation 2, Chapter 4). Selection of field methods using an "expert system" developed in this project (Recommendation 3, Chapter 5) or another well-documented system. Preparation and storage of metadata describing the monitoring program in the Natural Resources Monitoring Partnership (NRMP), and other appropriate databases Recommendation 4, Chapter 6). Entry of the survey data using eBird (http://ebird.org/content/dod) or the Coordinated Bird Monitoring Database (CBMD) and long-term storage of the data in the CBMD and the Avian Knowledge Network (AKN; Recommendation 5, Chapter 6; http://www.avianknowledge.net/). Submission of major results from the monitoring program for publication in a peer reviewed journal (Recommendation 6). The DoD Legacy Resource Management Program (Legacy; https://www.dodlegacy.org), Environmental Security Technology Certification Program (ESTCP; http://www.serdp.org/), and Strategic Environmental Research and Development Program (SERDP; http://www.serdp.org/) should be encouraged to continue their significant contributions to the foundations of bird monitoring (Recommendation 7, Chapters 1 and 3). Appropriate monitoring should be conducted to identify species of concern on installations. A year-round, one-time survey of birds on installations with habitat for migratory birds would provide the most information to assist compliance with the MOU, the Final Rule, and the NEPA analyses of proposed actions. However, less intensive survey efforts can still be conducted to yield useful information. We describe how various levels of survey effort might be organized and conducted. In addition, continuing surveys, as feasible, would further assist in documenting effects of military readiness and non-readiness activities on species of concern (SOC) (Recommendation 8, Chapter 7). Participation in well-designed, large-scale surveys [(e.g., North American Breeding Bird Survey (BBS; http://www.pwrc.usgs.gov/bbs/), Monitoring Avian Productivity and Survivorship (MAPS; http://www.birdpop.org/maps.htm)] on land that DoD manages or on lands where the results will be of high interest to DoD, will provide DoD and other NABCI members with information important to bird conservation (Recommendation 9, Chapter 8). Review and implementation of the CBM Plan should involve both higher level management and installation-level natural resources managers (Recommendation 11), be implemented through cooperative partnerships (Recommendation 12), and be followed on U.S territory lands and Army Corps of Engineers projects (Recommendation 10).Additional recommendations that pertain to implementing the DoD CBM Plan are discussed in Chapter 9.

  5. 49 CFR 1155.21 - Form of notice.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... request. Questions concerning potential environmental issues may be directed to the Board's Section of Environmental Analysis. Where the preparation of environmental documentation under the National Environmental... documentation in the railroad's possession on these issues will be made available promptly to those requesting...

  6. Environmental resource document for the Idaho National Engineering Laboratory. Volume 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Irving, J.S.

    This document contains information related to the environmental characterization of the Idaho National Engineering Laboratory (INEL). The INEL is a major US Department of Energy facility in southeastern Idaho dedicated to nuclear research, waste management, environmental restoration, and other activities related to the development of technology. Environmental information covered in this document includes land, air, water, and ecological resources; socioeconomic characteristics and land use; and cultural, aesthetic, and scenic resources.

  7. 76 FR 54752 - Union Electric Company (dba Ameren Missouri); Notice of Application Ready for Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-02

    ... open channel to the lower reservoir; (6) a 138-kilovolt switchyard/ substation; (7) a gravel and sedimentation trap (bin wall) on the East Fork of the Black River; and (8) associated ancillary equipment. m. A...

  8. 40 CFR 238.20 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) OCEAN DUMPING DEGRADABLE PLASTIC RING... means the percent increase in length of the plastic material caused by a tensile load. Percent... entities that produce ring carriers ready for use as beverage carriers. Ring carrier means any plastic ring...

  9. 40 CFR 406.91 - Specialized definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 28 2010-07-01 2010-07-01 true Specialized definitions. 406.91 Section 406.91 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS GRAIN MILLS POINT SOURCE CATEGORY Ready-to-Eat Cereal Subcategory § 406.91 Specialized definitions...

  10. 40 CFR 238.20 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) OCEAN DUMPING DEGRADABLE PLASTIC RING... means the percent increase in length of the plastic material caused by a tensile load. Percent... entities that produce ring carriers ready for use as beverage carriers. Ring carrier means any plastic ring...

  11. 40 CFR 238.20 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) OCEAN DUMPING DEGRADABLE PLASTIC RING... means the percent increase in length of the plastic material caused by a tensile load. Percent... entities that produce ring carriers ready for use as beverage carriers. Ring carrier means any plastic ring...

  12. 40 CFR 238.20 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) OCEAN DUMPING DEGRADABLE PLASTIC RING... means the percent increase in length of the plastic material caused by a tensile load. Percent... entities that produce ring carriers ready for use as beverage carriers. Ring carrier means any plastic ring...

  13. 40 CFR 238.20 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) OCEAN DUMPING DEGRADABLE PLASTIC RING... means the percent increase in length of the plastic material caused by a tensile load. Percent... entities that produce ring carriers ready for use as beverage carriers. Ring carrier means any plastic ring...

  14. 78 FR 72096 - Environmental Documents Prepared for Oil, Gas, and Mineral Operations by the Gulf of Mexico Outer...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-02

    ... environmental documents prepared for OCS mineral proposals by the Gulf of Mexico OCS Region. SUMMARY: BOEM, in... DEPARTMENT OF THE INTERIOR Bureau of Ocean Energy Management [MMAA104000] Environmental Documents Prepared for Oil, Gas, and Mineral Operations by the Gulf of Mexico Outer Continental Shelf (OCS) Region...

  15. 78 FR 47746 - Environmental Documents Prepared for Oil, Gas, and Mineral Operations by the Gulf of Mexico Outer...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-06

    ... Environmental Documents Prepared for OCS Mineral Proposals by the Gulf of Mexico OCS Region. SUMMARY: BOEM, in... DEPARTMENT OF THE INTERIOR Bureau of Ocean Energy Management [MMAA104000] Environmental Documents Prepared for Oil, Gas, and Mineral Operations by the Gulf of Mexico Outer Continental Shelf (OCS) Region...

  16. 78 FR 27422 - Environmental Documents Prepared for Oil, Gas, and Mineral Operations by the Gulf of Mexico Outer...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-10

    ... Environmental Documents Prepared for OCS Mineral Proposals by the Gulf of Mexico OCS Region. SUMMARY: BOEM, in... DEPARTMENT OF THE INTERIOR Bureau of Ocean Energy Management MMAA104000 Environmental Documents Prepared for Oil, Gas, and Mineral Operations by the Gulf of Mexico Outer Continental Shelf (OCS) Region...

  17. Astrionics system designers handbook, volume 1

    NASA Technical Reports Server (NTRS)

    1973-01-01

    Hardware elements in new and advanced astrionics system designs are discussed. This cost effective approach has as its goal the reduction of R&D and testing costs through the application of proven and tested astrionics components. The ready availability to the designer of data facts for applicable system components is highly desirable. The astrionics System Designers Handbook has as its objective this documenting of data facts to serve the anticipated requirements of the astrionics system designer. Eleven NASA programs were selected as the reference base for the document. These programs are: ATS-F, ERTS-B, HEAO-A, OSO-I, Viking Orbiter, OAO-C, Skylab AM/MDA, Skylab ATM, Apollo 17 CSM, Apollo 17 LM and Mariner Mars 71. Four subsystems were chosen for documentation: communications, data management, electrical power and guidance, navigation and control.

  18. Hanford Site National Environmental Policy Act (NEPA) Characterization Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Neitzel, Duane A.; Bunn, Amoret L.; Cannon, Sandra D.

    2004-09-22

    This document describes the U.S. Department of Energy's (DOE) Hanford Site environment. It is updated each year and is intended to provide a consistent description of the Hanford Site environment for the many National Environmental Policy Act (NEPA) documents being prepared by DOE contractors. No statements of significance or environmental consequences are provided. This year's report is the sixteenth revision of the original document published in 1988 and is (until replaced by the seventeenth revision) the only version that is relevant for use in the preparation of Hanford NEPA, State Environmental Policy Act (SEPA), and Comprehensive Environmental Response, Compensation, andmore » Liability Act (CERCLA) documents. The two chapters included in this document (Chapters 4 and 6) are numbered to correspond to the chapters where such information is typically presented in environmental impact statements (Weiss) and other Hanford Site NEPA or CERCLA documentation. Chapter 4.0 (Affected Environment) describes Hanford Site climate and meteorology, geology, hydrology, ecology, cultural, archaeological, and historical resources, socioeconomics, occupational safety and health, and noise. Chapter 6.0 (Statutory and Regulatory Requirements) describes federal and state laws and regulations, DOE directives and permits, and presidential executive orders that are applicable to the NEPA documents prepared for Hanford Site activities.« less

  19. Biodegradability, toxicity and mutagenicity of detergents: Integrated experimental evaluations.

    PubMed

    Pedrazzani, Roberta; Ceretti, Elisabetta; Zerbini, Ilaria; Casale, Rosario; Gozio, Eleonora; Bertanza, Giorgio; Gelatti, Umberto; Donato, Francesco; Feretti, Donatella

    2012-10-01

    The widespread use of detergents has raised concern with regard to the environmental pollution caused by their active ingredients, which are biorefractory, toxic and persistent. Since detergents are complex mixtures of different substances, in which synergistic effects may occur, we aimed to assess the mutagenicity of different detergent formulations, taking into account aquatic toxicity and ready biodegradability. We performed a ready biodegradability test (OECD 301 F), Daphnia magna and Vibrio fischeri toxicity tests, and mutagenicity tests (Salmonella/microsome test, Allium cepa test and comet assay). Six detergent formulations were examined, 3 pre-manufacture and 3 commercially available. All detergents presented ready biodegradability. EC50 values varied for all products, according to the marker organism used, but were always higher than the more stringent value considered for aquatic toxicity assessment (V. fischeri 10-60 mg/L; D. magna 25-300 mg/L; A. cepa 250-2000 mg/L). None of the detergents caused mutations in bacteria. However, one commercial ecolabelled product induced an increase in micronucleus frequency in A. cepa root cells. All pre-manufacture detergents and one commercial one, which gave negative results in the Ames and A. cepa tests, induced DNA damage in human leukocytes. A more accurate evaluation of the environmental impact of complex mixtures such as detergents requires a battery of tests to describe degradation, as well as toxicological and mutagenic features. Copyright © 2012 Elsevier Inc. All rights reserved.

  20. Consensus modeling to develop the farmers' market readiness assessment and decision instrument.

    PubMed

    Lee, Eunlye; Dalton, Jarrod; Ngendahimana, David; Bebo, Pat; Davis, Ashley; Remley, Daniel; Smathers, Carol; Freedman, Darcy A

    2017-09-01

    Nutrition-related policy, system, and environmental (PSE) interventions such as farmers' markets have been recommended as effective strategies for promoting healthy diet for chronic disease prevention. Tools are needed to assess community readiness and capacity factors influencing successful farmers' market implementation among diverse practitioners in different community contexts. We describe a multiphase consensus modeling approach used to develop a diagnostic tool for assessing readiness and capacity to implement farmers' market interventions among public health and community nutrition practitioners working with low-income populations in diverse contexts. Modeling methods included the following: phase 1, qualitative study with community stakeholders to explore facilitators and barriers influencing successful implementation of farmers' market interventions in low-income communities; phase 2, development of indicators based on operationalization of qualitative findings; phase 3, assessment of relevance and importance of indicators and themes through consensus conference with expert panel; phase 4, refinement of indicators based on consensus conference; and phase 5, pilot test of the assessment tool. Findings illuminate a range of implementation factors influencing farmers' market PSE interventions and offer guidance for tailoring intervention delivery based on levels of community, practitioner, and organizational readiness and capacity.

  1. Third NASA Advanced Composites Technology Conference, volume 1, part 1

    NASA Technical Reports Server (NTRS)

    Davis, John G., Jr. (Compiler); Bohon, Herman L. (Compiler)

    1993-01-01

    This document is a compilation of papers presented at the Third NASA Advanced Composites Technology (ACT) Conference. The ACT Program is a major multi-year research initiative to achieve a national goal of technology readiness before the end of the decade. Conference papers recorded results of research in the ACT Program in the specific areas of automated fiber placement, resin transfer molding, textile preforms, and stitching as these processes influence design, performance, and cost of composites in aircraft structures. Papers sponsored by the Department of Defense on the Design and Manufacturing of Low Cost Composites (DMLCC) are also included in Volume 2 of this document.

  2. Technology Development Plan for the Baseline Detector System of the X-Ray Microcalorimeter Spectrometer (XMS) of the International X-Ray Observatory (IXO)

    NASA Technical Reports Server (NTRS)

    Kilbourne, C. A.; Boriese, W. B.

    2010-01-01

    The primary purpose of this document is to present the technology development plan for the XMS detector system. It covers the current status (including assessment of the Technology Readiness Level, TRL, and a justification of the level assigned), the roadmap to progress to a level between TRL 5 and TRL 6 by the middle of 2012, and an assessment of the associated cost. A secondary purpose of this document is to address the Action Items raised at the XMS Phase-A Study Mid-Term Review that pertain to the detector system (AI #4, #8, and #9).

  3. 77 FR 58416 - Comparative Environmental Evaluation of Alternatives for Handling Low-Level Radioactive Waste...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-20

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0218] Comparative Environmental Evaluation of Alternatives... public comment the Draft Comparative Environmental Evaluation of Alternatives for Handling Low-Level.... Availability of Documents ADAMS Accession No. Document title ML12256A965 Draft Comparative Environmental...

  4. 7 CFR 372.9 - Processing and use of environmental documents.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... to environmental assessments and findings of no significant impact that are prompted by comments, new... Section 372.9 Agriculture Regulations of the Department of Agriculture (Continued) ANIMAL AND PLANT HEALTH....9 Processing and use of environmental documents. (a) Environmental assessments will be forwarded...

  5. 7 CFR 372.9 - Processing and use of environmental documents.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... to environmental assessments and findings of no significant impact that are prompted by comments, new... Section 372.9 Agriculture Regulations of the Department of Agriculture (Continued) ANIMAL AND PLANT HEALTH....9 Processing and use of environmental documents. (a) Environmental assessments will be forwarded...

  6. 10 CFR 51.120 - Availability of environmental documents for public inspection.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Availability of environmental documents for public inspection. 51.120 Section 51.120 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act...

  7. 10 CFR 51.120 - Availability of environmental documents for public inspection.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Availability of environmental documents for public inspection. 51.120 Section 51.120 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act...

  8. 76 FR 2892 - City of Ouray; Notice of Application Accepted for Filing, Ready for Environmental Analysis, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-18

    ... feet of new pipeline to direct water to a new power plant. The power plant will house one Pelton turbine and induction motor generator with a maximum output of 20 kilowatt. g. Location: Ouray, Colorado...

  9. 75 FR 51987 - TideWorks, LLC; Notice of Application Ready for Environmental Analysis, Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-24

    ...-foot-long blades; (2) a new 10-foot-wide, 20-foot-long steel pontoon float to suspend the turbine into... run-of-river mode using the river current flood and ebb tidal flows to rotate the hydrokinetic turbine...

  10. Discussing Global Issues through Contemporary Art

    ERIC Educational Resources Information Center

    Mead, Sarah M.; Ellerbrock, Cheryl R.; Cruz, Bárbara C.

    2017-01-01

    Contemporary global issues can be examined through the lens of modern photographic art. In an effort to prepare global-ready graduates, this article explores the pressing problems of environmental degradation, urbanization, and homelessness through the work of three contemporary artists. Illustrative works, suggested approaches, and curriculum…

  11. A Communications Network for Cislunar Operations

    NASA Technical Reports Server (NTRS)

    Burleigh, Scott

    2012-01-01

    Reliable and efficient communications will be critical to the success of commercial flight operations in cislunar space. The Internet is not well-suited to meeting this requirement. But the Delay-Tolerant Networking (DTN) architecture is. The DTN protocols are well-documented and implementations are mature. We think DTN will be ready to support low-cost, low-risk cislunar networking by the time the vehicles are in place.

  12. Cohort profile: the resilience for eating and activity despite inequality (READI) study.

    PubMed

    Ball, Kylie; Cleland, Verity; Salmon, Jo; Timperio, Anna F; McNaughton, Sarah; Thornton, Lukar; Campbell, Karen; Jackson, Michelle; Baur, Louise A; Mishra, Gita; Brug, Johannes; Jeffery, Robert W; King, Abby; Kawachi, Ichiro; Crawford, David A

    2013-12-01

    The Resilience for Eating and Activity Despite Inequality (READI) cohort was established to address the following two key aims: to investigate the pathways (personal, social and structural) by which socio-economic disadvantage influences lifestyle choices associated with obesity risk (physical inactivity, poor dietary choices) and to explore mechanisms underlying 'resilience' to obesity risk in socio-economically disadvantaged women and children. A total of 4349 women aged 18-46 years and 685 children aged 5-12 years were recruited from 80 socio-economically disadvantaged urban and rural neighbourhoods of Victoria, Australia, and provided baseline (T1: 2007-08) measures of adiposity, physical activity, sedentary and dietary behaviours; socio-economic and demographic factors; and psychological, social and perceived environmental factors that might impact on obesity risk. Audits of the 80 neighbourhoods were undertaken at baseline to provide objective neighbourhood environmental data. Three-year follow-up data (2010-11) have recently been collected from 1912 women and 382 children. Investigators welcome enquiries regarding data access and collaboration.

  13. Health disparities and gaps in school readiness.

    PubMed

    Currie, Janet

    2005-01-01

    The author documents pervasive racial disparities in the health of American children and analyzes how and how much those disparities contribute to racial gaps in school readiness. She explores a broad sample of health problems common to U.S. children, such as attention deficit hyperactivity disorder, asthma, and lead poisoning, as well as maternal health problems and health-related behaviors that affect children's behavioral and cognitive readiness for school. If a health problem is to affect the readiness gap, it must affect many children, it must be linked to academic performance or behavior problems, and it must show a racial disparity either in its prevalence or in its effects. The author focuses not only on the black-white gap in health status but also on the poor-nonpoor gap because black children tend to be poorer than white children. The health conditions Currie considers seriously impair cognitive skills and behavior in individual children. But most explain little of the overall racial gap in school readiness. Still, the cumulative effect of health differentials summed over all conditions is significant. Currie's rough calculation is that racial differences in health conditions and in maternal health and behaviors together may account for as much as a quarter of the racial gap in school readiness. Currie scrutinizes several policy steps to lessen racial and socioeconomic disparities in children's health and to begin to close the readiness gap. Increasing poor children's eligibility for Medicaid and state child health insurance is unlikely to be effective because most poor children are already eligible for public insurance. The problem is that many are not enrolled. Even increasing enrollment may not work: socioeconomic disparities in health persist in Canada and the United Kingdom despite universal public health insurance. The author finds more promise in strengthening early childhood programs with a built-in health component, like Head Start; family-based services and home visiting programs; and WIC, the federal nutrition program for women, infants, and small children. In all three, trained staff can help parents get ongoing care for their children.

  14. Technology readiness assessments: A retrospective

    NASA Astrophysics Data System (ADS)

    Mankins, John C.

    2009-11-01

    The development of new system capabilities typically depends upon the prior success of advanced technology research and development efforts. These systems developments inevitably face the three major challenges of any project: performance, schedule and budget. Done well, advanced technology programs can substantially reduce the uncertainty in all three of these dimensions of project management. Done poorly, or not at all, and new system developments suffer from cost overruns, schedule delays and the steady erosion of initial performance objectives. It is often critical for senior management to be able to determine which of these two paths is more likely—and to respond accordingly. The challenge for system and technology managers is to be able to make clear, well-documented assessments of technology readiness and risks, and to do so at key points in the life cycle of the program. In the mid 1970s, the National Aeronautics and Space Administration (NASA) introduced the concept of "technology readiness levels" (TRLs) as a discipline-independent, programmatic figure of merit (FOM) to allow more effective assessment of, and communication regarding the maturity of new technologies. In 1995, the TRL scale was further strengthened by the articulation of the first definitions of each level, along with examples (J. Mankins, Technology readiness levels, A White Paper, NASA, Washington, DC, 1995. [1]). Since then, TRLs have been embraced by the U.S. Congress' General Accountability Office (GAO), adopted by the U.S. Department of Defense (DOD), and are being considered for use by numerous other organizations. Overall, the TRLs have proved to be highly effective in communicating the status of new technologies among sometimes diverse organizations. This paper will review the concept of "technology readiness assessments", and provide a retrospective on the history of "TRLs" during the past 30 years. The paper will conclude with observations concerning prospective future directions for the important discipline of technology readiness assessments.

  15. The Western Environmental Technology Office (WETO), Butte, Montana. Technology summary (Revised)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-03-01

    This document has been prepared by the US Department of Energy`s (DOE`s) Office of Environmental Management (EM) Office of Science and Technology (OST) to highlight its research, development, demonstration, testing, and evaluation (RDDT&E) activities funded through the Western environmental Technology Office (WETO) in Butte, Montana. Technologies and processes described in this document have the potential to enhance DOE`s cleanup and waste management efforts, as well as improve US industry`s competitiveness in global environmental markets. The information presented in this document has been assembled from recently produced OST documents that highlight technology development activities within each of the OST program elementsmore » and Focus Areas. This document presents one in a series for each of DOE`s Operations Office and Energy Technology Centers.« less

  16. Tsunami Ready Recognition Program for the Caribbean and Adjacent Regions Launched in 2015

    NASA Astrophysics Data System (ADS)

    von Hillebrandt-Andrade, C.; Hinds, K.; Aliaga, B.; Brome, A.; Lopes, R.

    2015-12-01

    Over 75 tsunamis have been documented in the Caribbean and Adjacent Regions over the past 500 years with 4,561 associated deaths according to the NOAA Tsunami Database. The most recent devastating tsunamis occurred in 1946 in Dominican Republic; 1865 died. With the explosive increase in residents, tourists, infrastructure, and economic activity along the coasts, the potential for human and economic loss is enormous. It has been estimated that on any day, more than 500,000 people in the Caribbean could be in harm's way just along the beaches, with hundreds of thousands more working and living in the tsunamis hazard zones. In 2005 the UNESCO Intergovernmental Oceanographic Commission established the Intergovernmental Coordination Group for the Tsunami and other Coastal Hazards Warning System for the Caribbean and Adjacent Regions (ICG CARIBE EWS) to coordinate tsunami efforts among the 48 participating countries in territories in the region. In addition to monitoring, modeling and communication systems, one of the fundamental components of the warning system is community preparedness, readiness and resilience. Over the past 10 years 49 coastal communities in the Caribbean have been recognized as TsunamiReady® by the US National Weather Service (NWS) in the case of Puerto Rico and the US Virgin Islands and jointly by UNESCO and NWS in the case of the non US jurisdictions of Anguilla and the British Virgin Islands. In response to the positive feedback of the implementation of TsunamiReady, the ICG CARIBE EWS in 2015 recommended the approval of the guidelines for a Community Performance Based Recognition program. It also recommended the adoption of the name "Tsunami Ready", which has been positively consulted with the NWS. Ten requirements were established for recognition and are divided among Preparedness, Mitigation and Response elements which were adapted from the proposed new US TsunamiReady guidelines and align well with emergency management functions. Both a regional ICG CARIBE EWS and national/territorial "Tsunami Ready" boards will administer the recognition program. With the "Tsunami Ready" program, it will be possible for to better track the full implementation of tsunami warning system in the Caribbean and Adjacent regions. Member States and donor agencies have been invited to support pilot projects.

  17. The Centaur Director kicks off Environment and Energy Awareness Week

    NASA Technical Reports Server (NTRS)

    1999-01-01

    Center Director Roy Bridges (right) gets ready to drive an electric car, provided by Florida Power & Light, to the opening of Environmental and Energy Awareness Week at the Kennedy Space Center Visitor Complex. Exhibits and displays by KSC and 45th Space Wing organizations detail accomplishments in minimizing environmental impacts and conserving resources. They are on view April 19 - 22 at various sites at KSC, Cape Canaveral Air Station and Patrick Air Force Base.

  18. Concentrating Toxoplasma gondii and Cyclospora cayetanensis from Surface Water and Drinking Water by Continuous Separation Channel Centrifugation

    EPA Science Inventory

    Aims: To evaluate the effectiveness of continuous separation channel centrifugation for concentrating Toxoplasma gondii and Cyclospora cayetanensis from drinking water and environmental waters. Methods and Results: Ready-to-seed vials with known quantities of Toxoplasma gondii a...

  19. Air Force Materiel Command Readiness Training Center Final Environmental Assessment

    DTIC Science & Technology

    2003-05-01

    provision of specific habitat variables. As an example, the ivory -billed woodpecker (Campephilus principalis) that once flourished in bottomland...due to poaching and loss of fire-dependent habitat (U. S. Air Force, 1995). Many associate species use or are dependent on tortoise burrows for

  20. 40 CFR 158.2280 - Environmental fate.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... biodegradability, porous pot, the biodegradation in activated sludge study as described in the “Simulation Tests to... applicant must choose either to: A. Conduct the biodegradation in activated sludge study as described in the... ready biodegradability study; or B. Conduct one of the following studies: The biodegradation in...

  1. 40 CFR 158.2280 - Environmental fate.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... biodegradability, porous pot, the biodegradation in activated sludge study as described in the “Simulation Tests to... applicant must choose either to: A. Conduct the biodegradation in activated sludge study as described in the... ready biodegradability study; or B. Conduct one of the following studies: The biodegradation in...

  2. 40 CFR 406.96 - Pretreatment standards for new sources.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 28 2010-07-01 2010-07-01 true Pretreatment standards for new sources. 406.96 Section 406.96 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS GRAIN MILLS POINT SOURCE CATEGORY Ready-to-Eat Cereal Subcategory § 406.96...

  3. Outdoor Education. Resource Catalogue.

    ERIC Educational Resources Information Center

    Manitoba Dept. of Education and Training, Winnipeg.

    The material in this catalog has been compiled to serve as a ready reference for teachers to assist them in locating outdoor education materials and obtaining environmental student project assistance available from government departments and private organizations within the province of Manitoba. Part 1 lists agencies that can provide speakers,…

  4. E-Estuary: Developing a Decision-support System for Coastal Management in the Conterminous United States

    EPA Science Inventory

    Ready access to geographic information is needed to support management decisions for estuaries at local, state, regional, and national scales. The United States Environmental Protection Agency (US EPA) is developing e-Estuary, a decision-support system for coastal management. E...

  5. Guiding Documents for Environmental Education Centres: An Analysis in the Spanish Context

    ERIC Educational Resources Information Center

    Medir, Rosa Maria; Heras, Raquel; Geli, Anna Maria

    2014-01-01

    Guiding documents under the "PEC" acronym are commonly used in environmental education centres (EECs) in Spain. They are written documents that are seen as necessary tools to safeguard quality. In this study, we analyse the guiding documents of twenty-three EECs in the province of Girona (Catalonia, Spain) in order to understand their…

  6. Photovoltaic system criteria documents. Volume 1: Guidelines for evaluating the management and operations planning of photovoltaic applications

    NASA Technical Reports Server (NTRS)

    Koenig, John C.; Billitti, Joseph W.; Tallon, John M.

    1979-01-01

    Guidelines are provided to the Field Centers for organization, scheduling, project and cost control, and performance in the areas of project management and operations planning for Photovoltaics Test and Applications. These guidelines may be used in organizing a T and A Project Team for system design/test, site construction and operation, and as the basis for evaluating T and A proposals. The attributes are described for project management and operations planning to be used by the Field Centers. Specifically, all project management and operational issues affecting costs, schedules and performance of photovoltaic systems are addressed. Photovoltaic tests and applications include residential, intermediate load center, central station, and stand-alone systems. The sub-categories of system maturity considered are: Initial System Evaluation Experiments (ISEE); System Readiness Experiments (SRE); and Commercial Readiness Demonstration Projects (CRDP).

  7. 40 CFR 1500.4 - Reducing paperwork.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... the environmental impact statement process accordingly (§ 1501.7). (h) Summarizing the environmental...). (o) Combining environmental documents with other documents (§ 1506.4). (p) Using categorical... effect on the human environment and which are therefore exempt from requirements to prepare an...

  8. 40 CFR 1500.4 - Reducing paperwork.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... the environmental impact statement process accordingly (§ 1501.7). (h) Summarizing the environmental...). (o) Combining environmental documents with other documents (§ 1506.4). (p) Using categorical... effect on the human environment and which are therefore exempt from requirements to prepare an...

  9. 40 CFR 1500.4 - Reducing paperwork.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... the environmental impact statement process accordingly (§ 1501.7). (h) Summarizing the environmental...). (o) Combining environmental documents with other documents (§ 1506.4). (p) Using categorical... effect on the human environment and which are therefore exempt from requirements to prepare an...

  10. Antimicrobial Resistance, Virulence Profile, and Molecular Characterization of Listeria monocytogenes Isolated from Ready-to-eat Food in China, 2013-2014.

    PubMed

    Yan, Shao Fei; Wang, Wei; Bai, Li; Hu, Yu Jie; Dong, Yin Ping; Xu, Jin; Li, Feng Qin

    2016-06-01

    We aimed to investigate the potential pathogenic profile and antibiotic resistance of Listeria monocytogenes isolated from ready-to-eat food in China. Antimicrobial resistance was determined by broth microdilution following the Clinical and Laboratory Standards Institute protocol. Molecular serotyping, virulence, and resistance genes were identified using PCR. Multi-locus sequence typing was performed on resistant strains. A total of 11.53% (113/980) isolates were resistant, from which 82.3% (93/113) harbored all the virulence genes tested. The resistant strains were subtyped into 18 sequence types (STs), from which ST2, ST5, ST8, and ST9 were involved in listeriosis. This study indicated that several L. monocytogenes isolates from ready-to-eat foods in China have pathogenic potential and are resistant to antibiotics, including antibiotics used as medicines by humans for listeriosis treatment. Copyright © 2016 The Editorial Board of Biomedical and Environmental Sciences. Published by China CDC. All rights reserved.

  11. HEALTH AND ENVIRONMENTAL EFFECTS DOCUMENT FOR BENZYL ALCOHOL

    EPA Science Inventory

    Health and Environmental Effects Documents (HEEDS) are prepared for the Office of Solid Waste and Emergency Response (OSWER). his document series is intended to support listings under the Resource Conservation and Recovery Act (RCRA) as well as to provide health-related limits an...

  12. HEALTH AND ENVIRONMENTAL EFFECTS DOCUMENT FOR BROMOFORM

    EPA Science Inventory

    Health and Environmental Effects Documents (HEEDS) are prepared for the Office of Solid Waste and Emergency Response (OSWER). his document series is intended to support listings under the Resource Conservation and Recovery Act (RCRA) as well as to provide health-related limits an...

  13. HEALTH AND ENVIRONMENTAL EFFECTS DOCUMENT FOR CACODYLIC ACID

    EPA Science Inventory

    Health and Environmental Effects Documents (HEEDS) are prepared for the Office of Solid Waste and Emergency Response (OSWER). his document series is intended to support listings under the Resource Conservation and Recovery Act (RCRA) as well as to provide health-related limits an...

  14. Health and Environmental Effects Document for L-Butanol

    EPA Science Inventory

    Health and Environmental Effects Documents (HEEDS) are prepared for the Office of Solid Waste and Emergency Response (OSWER). This document series is intended to support listings under the Resource Conservation and Recovery Act (RCRA) as well as to provide health-related limits a...

  15. HEALTH AND ENVIRONMENTAL EFFECTS DOCUMENT FOR BROMOCHLOROMETHANE

    EPA Science Inventory

    Health and Environmental Effects Documents (HEEDS) are prepared for the Office of Solid Waste and Emergency Response (OSWER). his document series is intended to support listings under the Resource Conservation and Recovery Act (RCRA) as well as to provide health-related limits an...

  16. Hanford Site National Environmental Policy Act (NEPA) Characterization Report, Revision 17

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Neitzel, Duane A.; Bunn, Amoret L.; Cannon, Sandra D.

    2005-09-30

    This document describes the U.S. Department of Energy’s (DOE) Hanford Site environment. It is updated each year and is intended to provide a consistent description of the Hanford Site environment for the many environmental documents being prepared by DOE contractors concerning the National Environmental Policy Act (NEPA). No statements about significance or environmental consequences are provided. This year’s report is the seventeenth revision of the original document published in 1988 and is (until replaced by the eighteenth revision) the only version that is relevant for use in the preparation of Hanford NEPA, State Environmental Policy Act (SEPA), and Comprehensive Environmentalmore » Response, Compensation, and Liability Act (CERCLA) documents. The two chapters included in this document (Chapters 4 and 6) are numbered to correspond to the chapters where such information is typically presented in environmental impact statements (EISs) and other Hanford Site NEPA or CERCLA documentation. Chapter 4.0 (Affected Environment) describes Hanford Site climate and meteorology; air quality; geology; hydrology; ecology; cultural, archaeological, and historical resources; socioeconomics; noise; and occupational health and safety. Sources for extensive tabular data related to these topics are provided in the chapter. Most subjects are divided into a general description of the characteristics of the Hanford Site, followed by site-specific information, where available, of the 100, 200, 300, and other areas. This division allows the reader to go directly to those sections of particular interest. When specific information on each of these separate areas is not complete or available, the general Hanford Site description should be used. Chapter 6.0 (Statutory and Regulatory Requirements) describes federal and state laws and regulations, DOE directives and permits, and presidential executive orders that are applicable to the NEPA documents prepared for Hanford Site activities. Information in Chapter 6 of this document can be adapted and supplemented with specific information for a chapter covering statutory and regulatory requirements in an environmental assessment or environmental impact statement. When preparing environmental assessments and EISs, authors should also be cognizant of the document titled Recommendations for the Preparation of Environmental Assessments and Environmental Impact Statements published by the DOE Office of NEPA Oversight (DOE 2004). Additional guidance on preparing DOE NEPA documents can be found at http://tis.eh.doe.gov/nepa/guidance.html. Any interested individual seeking baseline data on the Hanford Site and its past activities may also use the information contained in this document to evaluate projected activities and their impacts. For this 2005 revision, the following sections of the document were reviewed by the authors and updated with the best available information through May 2005: Climate and Meteorology Air Quality Geology – Seismicity section only Hydrology – Flow charts for the Columbia and Yakima rivers only Ecology – Threatened and Endangered Species subsection only Socioeconomics Occupational Safety All of Chapter 6.« less

  17. Hanford Site National Environmental Policy Act (NEPA) Characterization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Duncan, Joanne P.; Burk, Kenneth W.; Chamness, Mickie A.

    2007-09-27

    This document describes the U.S. Department of Energy’s (DOE) Hanford Site environment. It is intended to provide a consistent description of the Hanford Site for the many environmental documents being prepared by DOE contractors concerning the National Environmental Policy Act (NEPA). No statements regarding significance or environmental consequences are provided. This year’s report is the eighteen revision of the original document published in 1988 and is (until replaced by the nineteenth revision) the only version that is relevant for use in the preparation of Hanford NEPA, State Environmental Policy Act (SEPA), and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA)more » documents. Two chapters are included in this document (Chapters 4 and 6), numbered to correspond to chapters typically presented in environmental impact statements (EISs) and other Hanford Site NEPA or CERCLA documentation. Chapter 4.0 (Affected Environment) describes Hanford Site climate and meteorology; air quality; geology; hydrology; ecology; cultural, archaeological, and historical resources; socioeconomics; noise; and occupational health and safety. Sources for extensive tabular data related to these topics are provided in the chapter. When possible, subjects are divided into a general description of the characteristics of the Hanford Site, followed by site-specific information, where available, for the 100, 200, 300 and other areas. This division allows the reader to go directly to those sections of particular interest. When specific information on each of these separate areas is not complete or available, the general Hanford Site description should be used. Chapter 6.0 (Statutory and Regulatory Requirements) describes federal and state laws and regulations, DOE directives and permits, and presidential executive orders that are applicable to NEPA documents prepared for Hanford Site activities. Information in Chapter 6 can be adapted and supplemented with specific information covering statutory and regulatory requirements for use in an environmental assessment or environmental impact statement. When preparing environmental assessments and EISs, authors should consult Recommendations for the Preparation of Environmental Assessments and Environmental Impact Statements published by the DOE Office of NEPA Oversight (DOE 2004). Additional direction and guidance on the preparation of DOE NEPA documents can be found at http://tis.eh.doe.gov/nepa/guidance.html. Individuals seeking baseline data on the Hanford Site and its past activities may also use the information contained in this document to evaluate projected activities and their impacts. Pacific Northwest National Laboratory (PNNL) staff prepared individual sections of this document, with input from other Hanford Site contractors with the best available information through May 2007. More detailed data are available from reference sources cited or from the authors. For this 2007 revision, the following sections of the document were reviewed by the authors and updated with the best available information through May 2005: Climate and Meteorology Air Quality Geology – Seismicity section only Hydrology – Flow charts for the Columbia and Yakima rivers only Ecology – Threatened and Endangered Species subsection only Socioeconomics Occupational Safety All of Chapter 6.« less

  18. Improvements and modifications to the NASA microwave signature acquisition system

    NASA Technical Reports Server (NTRS)

    Jean, B. R.; Newton, R. W.; Warren, G. L.; Clark, B. V.; Zajicek, J. L.

    1978-01-01

    A user oriented description of the modified and upgraded Microwave Signature Acquisition System is provided. The present configuration of the sensor system and its operating characteristics are documented and a step-by-step operating procedure provides instruction for mounting the antenna truss assembly, readying the system for data acquisition, and for controlling the system during the data collection sequence. The resulting data products are also identified.

  19. Fit for Duty Evaluating the Physical Fitness Requirements of Battlefield Airmen

    DTIC Science & Technology

    2017-01-01

    noncommercial use only. Unauthorized posting of this publication online is prohibited. Permission is given to duplicate this document for personal use only, as...relevant tests and standards for Battlefield Airmen. iv Preface Military occupations can be physically demanding, yet few attempts have been...made to determine the physical readiness of today’s Airmen to perform their jobs. Although the Air Force conducts fitness testing of all its Airmen

  20. Summer Institute in Engineering and Computer Applications: Learning Through Experience

    NASA Technical Reports Server (NTRS)

    Langdon, Joan S.

    1995-01-01

    The document describing the Summer Institute project is made up of the following information: Administrative procedures; Seminars/Special Courses/Tours/College fair; Facilities/ Transportation; Staff and Administration; Collaboration; Participant/Project monitoring and evaluation; Fiscal and developmental activities; Job readiness/Job internship development and placement; and Student Follow-up/Tracking. Appendices include presentations, self-evaluations; abstracts and papers developed by the students during their participation in the program.

  1. Joint Land Attack Cruise Missile Defense Elevated Netted Sensor System Not Ready for Production Decision (REDACTED)

    DTIC Science & Technology

    2012-09-07

    Average Procurement Unit Cost CMDS Cruise Missile Defense Systems CPD Capability Production Document EMD Engineering and Manufacturing...Defense for Acquisition, Technology and Logistics also determined that continuing test and evaluation of the two JLENS Engineering and Manufacturing...Program (Category ID) that was established in January 1996 and, during the audit, was in the Engineering and Manufacturing Development (EMD) phase of

  2. From Welfare to Work: Dynamic Lesson Plans for ESL Learners. Final Report. Fiscal Year 1998-99 [and] From Welfare to Work: Lessons for ESL Learners.

    ERIC Educational Resources Information Center

    Center for Literacy, Inc., Philadelphia, PA.

    This document combines a final project report and the resulting guidebook of 20 lesson plans for English as a second language (ESL) instructors to help learners work within the Temporary Assistance to Needy Families (TANF) system and acquire effective job readiness strategies, choose a career path, and pursue employment. The report describes the…

  3. College Knowledge: What It Really Takes for Students to Succeed and What We Can Do to Get Them Ready

    ERIC Educational Resources Information Center

    Conley, David T.

    2005-01-01

    Although more and more students have the test scores and transcripts to get into college, far too many are struggling once they get there. These students are surprised to find that college coursework demands so much more of them than high school. For the first time, they are asked to think deeply, write extensively, document assertions, solve…

  4. An Air Force Guide to Computer Program Configuration Management

    DTIC Science & Technology

    1977-08-01

    Various other constraints may’also prevent full completion of the Part I specification for a complex missi-on CPCI in all of its typically massive detail...specifications for developmental CPCIs. Relations of documentation to actual computer program modules is often such as to prevent -ready identification and...names and organizational alignments of the contractor activities ;,.ay vary, but the functions should be represented. The prgram office CCB is the

  5. Development of the Situation Awareness Flight Training and Simulation Evaluation (SAFTE) System: II: Final Development, Initial Test, and Documentation of the System

    DTIC Science & Technology

    1999-08-01

    Parkway, Cambridge, MA 02138, (617) 876-8085) has ready-to-use DIS/ HLA interfaces for the PC ($3500.00). The other work required involves improving the...bomb the Target Designator Box. (SA MEASURE B27 : When the aircraft passes 1,300 MSL, ask: YOU MUST ABORT THE ATTACK IF YOU HAVE NOT RELEASED THE

  6. Ready for the Future: Assessing the Collaborative Capacity of State Emergency Management Agencies

    DTIC Science & Technology

    2013-03-01

    Management and Budget, Paperwork Reduction Project (0704-0188) Washington DC 20503. 1. AGENCY USE ONLY (Leave blank) 2. REPORT DATE March 2013...Preparedness) SEOC State Emergency Operations Center xiv SFI Strategic Foresight Initiative SPSS Statistical Package for the Social Sciences UASI... management discipline and to define the core capabilities to meet those needs. The Strategic Foresight Initiative (SFI) resulted in a vision document

  7. OEM Emergency Preparedness Information

    EPA Pesticide Factsheets

    The Office of Emergency Management compiles a wide variety of information in support of Emergency Preparedness, including certain elements of the System for Risk Management Plans (SRMP), a wide variety of training and guidance materials, inventories and readiness/O&M status of equipment and response personnel. Some of the data available to EPA for this emergency preparedness includes industry trade secret information.A major component of this data asset is information compiled in the Compendium of Environmental Testing Laboratories. This information allows OEM to direct samples recovered from emergency incidents to the appropriate laboratory certified to analyze the substances in question.Also included here are all types of field readiness information, training logs, and personnel contact information.

  8. An improved approach for flight readiness certification: Probabilistic models for flaw propagation and turbine blade failure. Volume 2: Software documentation

    NASA Technical Reports Server (NTRS)

    Moore, N. R.; Ebbeler, D. H.; Newlin, L. E.; Sutharshana, S.; Creager, M.

    1992-01-01

    An improved methodology for quantitatively evaluating failure risk of spaceflights systems to assess flight readiness and identify risk control measures is presented. This methodology, called Probabilistic Failure Assessment (PFA), combines operating experience from tests and flights with analytical modeling of failure phenomena to estimate failure risk. The PFA methodology is of particular value when information on which to base an assessment of failure risk, including test experience and knowledge of parameters used in analytical modeling, is expensive or difficult to acquire. The PFA methodology is a prescribed statistical structure in which analytical models that characterize failure phenomena are used conjointly with uncertainties about analysis parameters and/or modeling accuracy to estimate failure probability distributions for specific failure modes. These distributions can then be modified, by means of statistical procedures of the PFA methodology, to reflect any test or flight experience. State-of-the-art analytical models currently employed for design, failure prediction, or performance analysis are used in this methodology. The rationale for the statistical approach taken in the PFA methodology is discussed, the PFA methodology is described, and examples of its application to structural failure modes are presented. The engineering models and computer software used in fatigue crack growth and fatigue crack initiation applications are thoroughly documented.

  9. An improved approach for flight readiness certification: Methodology for failure risk assessment and application examples. Volume 2: Software documentation

    NASA Technical Reports Server (NTRS)

    Moore, N. R.; Ebbeler, D. H.; Newlin, L. E.; Sutharshana, S.; Creager, M.

    1992-01-01

    An improved methodology for quantitatively evaluating failure risk of spaceflight systems to assess flight readiness and identify risk control measures is presented. This methodology, called Probabilistic Failure Assessment (PFA), combines operating experience from tests and flights with engineering analysis to estimate failure risk. The PFA methodology is of particular value when information on which to base an assessment of failure risk, including test experience and knowledge of parameters used in engineering analyses of failure phenomena, is expensive or difficult to acquire. The PFA methodology is a prescribed statistical structure in which engineering analysis models that characterize failure phenomena are used conjointly with uncertainties about analysis parameters and/or modeling accuracy to estimate failure probability distributions for specific failure modes, These distributions can then be modified, by means of statistical procedures of the PFA methodology, to reflect any test or flight experience. Conventional engineering analysis models currently employed for design of failure prediction are used in this methodology. The PFA methodology is described and examples of its application are presented. Conventional approaches to failure risk evaluation for spaceflight systems are discussed, and the rationale for the approach taken in the PFA methodology is presented. The statistical methods, engineering models, and computer software used in fatigue failure mode applications are thoroughly documented.

  10. Overseas Environmental Baseline Guidance Document

    DTIC Science & Technology

    2007-05-01

    The primary purpose of this Overseas Environmental Baseline Guidance Document (OEBGD) is to provide criteria and management practices to be used by ...establishes standards for environmental compliance at Department of Defense controlled or operated installations in countries for which no FGS have been established.

  11. E-Estuary: Developing a Decision Support System for Coastal Management in the Conterminous United States (IAHR)

    EPA Science Inventory

    Ready access to geographic information is needed to support management decisions for estuaries at local, state, regional, and national scales. The U.S. Environmental Protection Agency (US EPA) is developing e-Estuary, a decision-support system for coastal management. E-Estuary ...

  12. Low temperature exposure to post-vitellogenic channel catfish, Ictalurus punctatus extend reporductive readiness

    USDA-ARS?s Scientific Manuscript database

    Channel catfish, Ictalurus punctatus.spawn annually during the spring and early summer (24 -30 °C). Environmental temperature is the main factor that controls the seasonal maturation of gonads and the timing of spawning. Temperature fluctuations can adversely affect spawning and broodfish conditio...

  13. Report: Independent Environmental Sampling Shows Some Properties Designated by EPA as Available for Use Had Some Contamination

    EPA Pesticide Factsheets

    Report #15-P-0221, July 21, 2015. Some OIG sampling results showed contamination was still present at sites designated by the EPA as ready for reuse. This was unexpected and could signal a need to implement changes to ensure human health protection.

  14. E-Estuary: Developing a Decision-support System for Coastal Management in the Counterminous Untied States (Coastal Geotools 09)

    EPA Science Inventory

    Ready access to geographic information is needed to support management decisions for estuaries at local, state, regional, and national scales. The U.S. Environmental Protection Agency (US EPA) is developing e-Estuary, a decision-support system for coastal management. E-Estuary ...

  15. E-estuary: A Decision Support System for Coastal Water and Ecosystem Management in the US (CZ09)

    EPA Science Inventory

    Ready access to geographic information is needed to support management decisions for estuaries at local, state, regional, and national scales. The U.S. Environmental Protection Agency (US EPA) is developing e-Estuary, a decision-support system for coastal management. E-Estuary ...

  16. KSC-04pd1972

    NASA Image and Video Library

    2004-09-23

    KENNEDY SPACE CENTER, FLA. - Herman Everett is ready to explain the use of hydrogen in a fuel cell vehicle during an exhibit by the Ford Motor Company of their modified Ford Focus. The exhibit was a response to inquiries about fuel cell vehicles during KSC’s Environmental and Energy Awareness week in April 2004.

  17. 75 FR 352 - Enloe Hydroelectric Project; Notice of Application Ready for Environmental Analysis and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12569-001] Enloe... copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE... concrete gravity arch dam with an integrated 276- foot-long central overflow spillway with 5-foot-high...

  18. 10 Paths to Green

    ERIC Educational Resources Information Center

    Kennedy, Mike

    2008-01-01

    Some institutions may feel comfortable with a few baby steps into the green world, while others may be ready to commit totally to environmental consciousness. Here, the author discusses 10 areas in which educators and administrators can beef up their green portfolio. These areas are in: alternative fuel, bikes/walking, water, education tools,…

  19. 77 FR 25995 - Western Technical College; Notice of Application Accepted for Filing With the Commission...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-02

    ... Technical College; Notice of Application Accepted for Filing With the Commission, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, Intent To Waive Scoping, Soliciting Comments....: 13417-002. c. Date filed: October 21, 2011. d. Applicant: Western Technical College. e. Name of Project...

  20. 78 FR 77115 - Lock 14 Hydro Partners; Notice of Application Ready for Environmental Analysis and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-20

    ...: Federal Power Act, 16 U.S.C. 791(a)-825(r). h. Applicant Contact: David Brown Kinloch, Lock 14 Hydro... of: (1) An existing 248-foot- long, 17-foot-high concrete lock and dam with a 319-foot-long stone...

  1. Are Your Schools Ready for the 21st Century?

    ERIC Educational Resources Information Center

    Vasilakis, John N.

    1990-01-01

    Although changes in instructional technology and population growth are the usual reasons school districts approach master planning as a tool for identifying and managing these changes, environmental concerns (like asbestos abatement and radon identification) play a role. A dozen tips for developing a master plan are provided. (MLH)

  2. Wildland Fire: Health Effects, EPA's Public Health Outreach and Smoke Ready Toolbox for Wildfires

    EPA Science Inventory

    Exposure to wildfire smoke is an environmental health topic that is growing in importance and impact and having relevance to many health officials across the country, as well as federal, state and local decision-makers. The webinar presented at the Council of State and Territori...

  3. 40 CFR 406.95 - Standards of performance for new sources.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 28 2010-07-01 2010-07-01 true Standards of performance for new sources. 406.95 Section 406.95 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS GRAIN MILLS POINT SOURCE CATEGORY Ready-to-Eat Cereal Subcategory § 406...

  4. 40 CFR 406.93-406.94 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 28 2010-07-01 2010-07-01 true [Reserved] 406.93-406.94 Section 406.93-406.94 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS GRAIN MILLS POINT SOURCE CATEGORY Ready-to-Eat Cereal Subcategory §§ 406.93-406.94 [Reserved] ...

  5. Physical Activity and Food Environments: Solutions to the Obesity Epidemic

    PubMed Central

    Sallis, James F; Glanz, Karen

    2009-01-01

    Context: Environmental, policy, and societal changes are important contributors to the rapid rise in obesity over the past few decades, and there has been substantial progress toward identifying environmental and policy factors related to eating and physical activity that can point toward solutions. This article is a status report on research on physical activity and food environments, and it suggests how these findings can be used to improve diet and physical activity and to control or reduce obesity. Methods: This article summarizes and synthesizes recent reviews and provides examples of representative studies. It also describes ongoing innovative interventions and policy change efforts that were identified through conference presentations, media coverage, and websites. Findings: Numerous cross-sectional studies have consistently demonstrated that some attributes of built and food environments are associated with physical activity, healthful eating, and obesity. Residents of walkable neighborhoods who have good access to recreation facilities are more likely to be physically active and less likely to be overweight or obese. Residents of communities with ready access to healthy foods also tend to have more healthful diets. Disparities in environments and policies that disadvantage low-income communities and racial minorities have been documented as well. Evidence from multilevel studies, prospective research, and quasi-experimental evaluations of environmental changes are just beginning to emerge. Conclusions: Environment, policy, and multilevel strategies for improving diet, physical activity, and obesity control are recommended based on a rapidly growing body of research and the collective wisdom of leading expert organizations. A public health imperative to identify and implement solutions to the obesity epidemic warrants the use of the most promising strategies while continuing to build the evidence base. PMID:19298418

  6. HEALTH AND ENVIRONMENTAL EFFECTS DOCUMENT FOR 1,3-BUTADIENE

    EPA Science Inventory

    Health and Environmental Effects Documents (HEEDS) are prepared for the Office of Solid Waste and Emergency Response (OSWER). This document series is intended to support listings under the Resource Conservation and Recovery Act (RCRA) as well as to provide health-related limits a...

  7. Recommendations for and Documentation of Biological Values for Use in Risk Assessment

    EPA Science Inventory

    The document was prepared by the Office of Health and Environmental Assessment, Environmental Criteria and Assessment Office, Cincinnati, OH for the Office of Solid Waste and Emergency Response. The document consists of an extensive compliation of values gleaned from published li...

  8. Early Academic Achievement Among American Low-Income Black Students from Immigrant and Non-Immigrant Families

    PubMed Central

    Calzada, Esther; Barajas-Gonzalez, R. Gabriela; Dawson-McClure, Spring; Huang, Keng-Yen; Palamar, Joseph; Kamboukos, Dimitra

    2015-01-01

    At least half of the well-documented achievement gap for low-income Black children is already present in kindergarten, due in part to limited opportunities for acquiring foundational skills necessary for school success. There is some evidence that low-income minority children from immigrant families have more positive outcomes than their non-immigrant counterparts, although little is known about how the immigrant paradox may manifest in young children. This study examines foundational school readiness skills (academic and social-emotional learning) at entry into pre-kindergarten (pre-k) and achievement in kindergarten and second grade among Black children from low-income immigrant and non-immigrant families (N=299). Immigrant and non-immigrant children entered pre-k with comparable readiness scores; in both groups, reading scores decreased significantly from kindergarten to second grade and math scores decreased significantly for non-immigrant children and marginally for immigrant children. Regardless of immigrant status, pre-k school readiness and pre-k classroom quality were associated with elementary school achievement. However, declines in achievement scores were not as steep for immigrant children and several predictive associations were moderated by immigrant status, such that among those with lower pre-k school readiness or in lower quality classrooms, immigrant children had higher achievement test scores than children from non-immigrant families. Findings suggest that immigrant status provides young Black students with some protection against individual- and classroom-level risk factors for early underachievement in elementary school. PMID:26048254

  9. Environmental Assessment of the Fielding of a CH-47 Chinook Platoon and Conversion to a General Support Aviation Battalion at Buckley Air Force Base, Colorado

    DTIC Science & Technology

    2004-04-01

    National Guard ESA Endangered Species Act ARPA Archaeological Resources Protection Act FAA Federal Aviation Administration ASC Army Safety Center ...General is responsible for training and readiness. Governors can call up members of the ARNG in times of domestic emergencies. The ARNG’s state...environmental effects, this EA assumes that each training mission originates and terminates at Buckley AFB. Under these assumptions, the 31 UH-1

  10. Environmental services coupled to food products and brands: food companies interests and on-farm accounting.

    PubMed

    Kempa, Daniela

    2013-09-01

    Much research has been carried out on governmental support of agri environmental measures (AEM). However, little is known about demands on and incentives from the commercial market for environmental contributions of the farmers. The factors farm structures, level of remuneration and legal framework have been thoroughly investigated. However, demands of the food industry for environmentally friendly goods(1) and their effects on farmers' decisions have not yet been analyzed. Leading companies in the food industry have observed an increasing consumer awareness and, due to higher competition, see an additional need to communicate environmental benefits which result from either organic production methods or agri-environmental measures. To address this research deficit, two case studies were carried out. The first case study is a survey aimed at the industrial food producers' demands with regards to the environmental performance of supplying farms. Concurrently, within a second survey farmers were questioned to find out what conditions are required to implement agri-environmental measures beyond cross compliance and document their environmental performance. This article presents the outcomes of the first case study. The results show that food companies have an interest in the documentation of environmental benefits of supplying farms for their marketing strategies. Provision of support by finance or contract-design is also seen as appropriate tool to promote an environmentally friendly production. In turn the food producers' demand and support for documented environmental services can have a positive influence on farmers' decisions for implementation and documentation of these services. Thus, the surveys provide essential findings for further development of documentation strategies for environmental benefits within the supply chain. Copyright © 2012 Elsevier Ltd. All rights reserved.

  11. 18 CFR 380.8 - Preparation of environmental documents.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... electric transmission corridors is the responsibility of the Commission's Office of Energy Projects, 888... environmental documents. 380.8 Section 380.8 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REVISED GENERAL RULES REGULATIONS IMPLEMENTING THE NATIONAL ENVIRONMENTAL...

  12. 18 CFR 380.8 - Preparation of environmental documents.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... corridors is the responsibility of the Commission's Office of Energy Projects, 888 First Street NE... environmental documents. 380.8 Section 380.8 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REVISED GENERAL RULES REGULATIONS IMPLEMENTING THE NATIONAL ENVIRONMENTAL...

  13. 18 CFR 380.8 - Preparation of environmental documents.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... corridors is the responsibility of the Commission's Office of Energy Projects, 888 First Street NE... environmental documents. 380.8 Section 380.8 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REVISED GENERAL RULES REGULATIONS IMPLEMENTING THE NATIONAL ENVIRONMENTAL...

  14. 18 CFR 380.8 - Preparation of environmental documents.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... corridors is the responsibility of the Commission's Office of Energy Projects, 888 First Street NE... environmental documents. 380.8 Section 380.8 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REVISED GENERAL RULES REGULATIONS IMPLEMENTING THE NATIONAL ENVIRONMENTAL...

  15. 18 CFR 380.8 - Preparation of environmental documents.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... electric transmission corridors is the responsibility of the Commission's Office of Energy Projects, 888... environmental documents. 380.8 Section 380.8 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REVISED GENERAL RULES REGULATIONS IMPLEMENTING THE NATIONAL ENVIRONMENTAL...

  16. 45 CFR 641.19 - Modification of environmental documents.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 3 2013-10-01 2013-10-01 false Modification of environmental documents. 641.19 Section 641.19 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION ENVIRONMENTAL ASSESSMENT PROCEDURES FOR PROPOSED NATIONAL SCIENCE FOUNDATION ACTIONS IN ANTARCTICA...

  17. 45 CFR 641.16 - Preparation of environmental documents, generally.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 3 2011-10-01 2011-10-01 false Preparation of environmental documents, generally. 641.16 Section 641.16 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION ENVIRONMENTAL ASSESSMENT PROCEDURES FOR PROPOSED NATIONAL SCIENCE FOUNDATION ACTIONS IN...

  18. 45 CFR 641.19 - Modification of environmental documents.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 3 2012-10-01 2012-10-01 false Modification of environmental documents. 641.19 Section 641.19 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION ENVIRONMENTAL ASSESSMENT PROCEDURES FOR PROPOSED NATIONAL SCIENCE FOUNDATION ACTIONS IN ANTARCTICA...

  19. 45 CFR 641.19 - Modification of environmental documents.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Modification of environmental documents. 641.19 Section 641.19 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION ENVIRONMENTAL ASSESSMENT PROCEDURES FOR PROPOSED NATIONAL SCIENCE FOUNDATION ACTIONS IN ANTARCTICA...

  20. 45 CFR 641.16 - Preparation of environmental documents, generally.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Preparation of environmental documents, generally. 641.16 Section 641.16 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION ENVIRONMENTAL ASSESSMENT PROCEDURES FOR PROPOSED NATIONAL SCIENCE FOUNDATION ACTIONS IN...

  1. 45 CFR 641.16 - Preparation of environmental documents, generally.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 3 2014-10-01 2014-10-01 false Preparation of environmental documents, generally. 641.16 Section 641.16 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION ENVIRONMENTAL ASSESSMENT PROCEDURES FOR PROPOSED NATIONAL SCIENCE FOUNDATION ACTIONS IN...

  2. 45 CFR 641.19 - Modification of environmental documents.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 3 2011-10-01 2011-10-01 false Modification of environmental documents. 641.19 Section 641.19 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION ENVIRONMENTAL ASSESSMENT PROCEDURES FOR PROPOSED NATIONAL SCIENCE FOUNDATION ACTIONS IN ANTARCTICA...

  3. 45 CFR 641.19 - Modification of environmental documents.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 3 2014-10-01 2014-10-01 false Modification of environmental documents. 641.19 Section 641.19 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION ENVIRONMENTAL ASSESSMENT PROCEDURES FOR PROPOSED NATIONAL SCIENCE FOUNDATION ACTIONS IN ANTARCTICA...

  4. 45 CFR 641.16 - Preparation of environmental documents, generally.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 3 2012-10-01 2012-10-01 false Preparation of environmental documents, generally. 641.16 Section 641.16 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION ENVIRONMENTAL ASSESSMENT PROCEDURES FOR PROPOSED NATIONAL SCIENCE FOUNDATION ACTIONS IN...

  5. 45 CFR 641.16 - Preparation of environmental documents, generally.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 3 2013-10-01 2013-10-01 false Preparation of environmental documents, generally. 641.16 Section 641.16 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION ENVIRONMENTAL ASSESSMENT PROCEDURES FOR PROPOSED NATIONAL SCIENCE FOUNDATION ACTIONS IN...

  6. Third NASA Advanced Composites Technology Conference, volume 1, part 2

    NASA Technical Reports Server (NTRS)

    Davis, John G., Jr. (Compiler); Bohon, Herman L. (Compiler)

    1993-01-01

    This document is a compilation of papers presented at the Third NASA Advanced Composites Technology (ACT) Conference held at Long Beach, California, 8-11 June 1992. The ACT Program is a major multi-year research initiative to achieve a national goal of technology readiness before the end of the decade. Conference papers recorded results of research in the ACT Program in the specific areas of automated fiber placement, resin transfer molding, textile preforms, and stitching as these processes influence design, performance, and cost of composites in aircraft structures. Papers sponsored by the Department of Defense on the Design and Manufacturing of Low Cost Composites (DMLCC) are also included in Volume 2 of this document.

  7. SIMBIOS Project

    NASA Technical Reports Server (NTRS)

    Fargion, Giulietta S.; McClain, Charles R.; Busalacchi, Antonio J. (Technical Monitor)

    2001-01-01

    The purpose of this technical report is to provide current documentation of the Sensor Intercomparison and Merger for Biological and Interdisciplinary Oceanic Studies (SIMBIOS) Project activities, NASA Research Announcement (NRAI) research status, satellite data processing, data product validation, and field calibration. This documentation is necessary to ensure that critical information is related to the scientific community and NASA management. This critical information includes the technical difficulties and challenges of validating and combining ocean color data from an array of independent satellite systems to form consistent and accurate global bio-optical time series products. This technical report is not meant as a substitute for scientific literature. Instead, it will provide a ready and responsive vehicle for the multitude of technical reports issued by an operational project.

  8. Design guide for high pressure oxygen systems

    NASA Technical Reports Server (NTRS)

    Bond, A. C.; Pohl, H. O.; Chaffee, N. H.; Guy, W. W.; Allton, C. S.; Johnston, R. L.; Castner, W. L.; Stradling, J. S.

    1983-01-01

    A repository for critical and important detailed design data and information, hitherto unpublished, along with significant data on oxygen reactivity phenomena with metallic and nonmetallic materials in moderate to very high pressure environments is documented. This data and information provide a ready and easy to use reference for the guidance of designers of propulsion, power, and life support systems for use in space flight. The document is also applicable to designs for industrial and civilian uses of high pressure oxygen systems. The information presented herein are derived from data and design practices involving oxygen usage at pressures ranging from about 20 psia to 8000 psia equal with thermal conditions ranging from room temperatures up to 500 F.

  9. CONVEX mini manual

    NASA Technical Reports Server (NTRS)

    Tennille, Geoffrey M.; Howser, Lona M.

    1993-01-01

    The use of the CONVEX computers that are an integral part of the Supercomputing Network Subsystems (SNS) of the Central Scientific Computing Complex of LaRC is briefly described. Features of the CONVEX computers that are significantly different than the CRAY supercomputers are covered, including: FORTRAN, C, architecture of the CONVEX computers, the CONVEX environment, batch job submittal, debugging, performance analysis, utilities unique to CONVEX, and documentation. This revision reflects the addition of the Applications Compiler and X-based debugger, CXdb. The document id intended for all CONVEX users as a ready reference to frequently asked questions and to more detailed information contained with the vendor manuals. It is appropriate for both the novice and the experienced user.

  10. 76 FR 57720 - Notice of Intent To Prepare an Environmental Impact Statement/Overseas Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-16

    ...The Department of the Navy published a document in the Federal Register (76 FR 174) on September 8, 2011, concerning public scoping meetings to support the development of an Environmental Impact Statement/Overseas Environmental Impact Statement for the Mariana Islands Training and Testing Study Area. The document contained an incorrect scoping date.

  11. Recent developments from the OPEnS Lab

    NASA Astrophysics Data System (ADS)

    Selker, J. S.; Good, S. P.; Higgins, C. W.; Sayde, C.; Buskirk, B.; Lopez, M.; Nelke, M.; Udell, C.

    2016-12-01

    The Openly Published Environmental Sensing (OPEnS) lab is a facility that is open to all from around the world to use (http://agsci.oregonstate.edu/open-sensing). With 3-D CAD, electronics benches, 3-D printers and laser cutters, and a complete precision metal shop, the lab can build just about anything. Electronic platforms such as the Arduino are combined with cutting edge sensors, and packaged in rugged housing to address critical environmental sensing needs. The results are published in GITHub and in the AGU journal Earth and Space Sciences under the special theme of "Environmental Sensing." In this poster we present advancements including: A ultra-precise isotopic sampler for rainfall; an isotopic sampler for soil gas; a data-logging wind vane that can be mounted on the tether of a balloon; a rain-gage calibrator with three rates of constant application; a <$20 dissolved O2 probe for water; a stream-bed permeameter that gives rapid quantification of permeability. You can use the OPEnS lab! Just sketch your idea on a white board and send it in. The conversation is started, and your prototype can be ready in a few weeks. We have a staff of three engineers ready to help, where you are working remotely, or decide to spend some time with the team in Corvallis.

  12. 32 CFR 989.11 - Combining EIAP with other documentation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... documentation. (a) The EPF combines environmental analysis with other related documentation when practicable (40 CFR 1506.4) following the procedures prescribed by the CEQ regulations and this part. (b) The EPF must... the EIAP. Prior to making a decision to proceed, the EPF must analyze the environmental impacts that...

  13. 76 FR 49526 - Environmental Impact Statement; Saint Louis County, MN

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-10

    ... environmental impacts of alternatives, including (1) No-build, (2) Purchasing title and possession of the.... The Scoping Document/Draft Scoping Decision Document is anticipated to be published in late 2011. A... Decision Document will be published after the public comment period has closed. A Draft EIS will be...

  14. ENVIRONMENTAL PLANNING FOR COMMUNITIES: A GUIDE TO THE ENVIRONMENTAL VISIONING PROCESS UTILIZING A GEOGRAPHIC INFORMATION SYSTEM (GIS)

    EPA Science Inventory

    This document emphasizes the local stakeholder's role in addressing community-wide environmental issues, especially with respect to the preferred "green" community development. The document is intended to help communities made decisions about alternative land uses and landscape ...

  15. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Marschman, Steven Craig

    While low burn-up fuel [that characterized as having a burn-up of less than 45 gigawatt days per metric ton uranium (GWD/MTU)] has been stored for nearly three decades, the storage of high burn-up used fuels is more recent. The DOE has funded a High Burn-Up (HBU) Confirmatory Data Project to confirm the behavior of used high burn-up fuel under prototypic conditions. The Electric Power Research Institute (EPRI) is leading a project team to develop and implement the Test Plan to collect this data from a UNF dry storage system containing high burn-up fuel. As part of that project, 25 “sister”more » fuel rods have been selected, removed from assemblies, and placed in a fuel container ready for shipment to a national laboratory. This report documents that status of readiness to receive the fuel if that fuel were to be sent to Idaho National Laboratory (INL).« less

  16. Examining the Developmental Process of Risk for Exposure to Community Violence among Urban Youth

    PubMed Central

    Lambert, Sharon F.; Bradshaw, Catherine P.; Cammack, Nicole L.; Ialongo, Nicholas S.

    2013-01-01

    Considerable research has documented the effects of community violence exposure on adolescents’ behavior and mental health functioning, yet there has been less research on the process by which early risks increase the likelihood that youth will be exposed to community violence. The current study used data from a community epidemiologically-defined sample of 623 urban youth followed from first grade through adolescence to examine the process by which early-onset aggressive behavior and poor academic readiness influenced risk for community violence exposure. Consistent with transactional developmental theories, early-onset aggressive and disruptive behavior was associated with poor academic readiness; these early risks contributed to later peer rejection, and subsequent conduct problems and greater affiliation with deviant peers, which in turn increased youths’ exposure to community violence. Having an enhanced understanding of the risk process directs attention to potential targets for preventive interventions for youth at risk for subsequent exposure to violence. PMID:21480029

  17. DOD Inventory of Contracted Services: Actions Needed to Help Ensure Inventory Data Are Complete and Accurate

    DTIC Science & Technology

    2015-11-01

    for Personnel and Readiness NAVSEA Naval Sea Systems Command OFPP Office of Federal Procurement Policy OMB Office of Management and Budget PDC ...Documentation of Contractors ( PDC ) process is delegated to the manpower and programing functions at the commands. The PDC process collects information from...review results. Army’s PDC tool, used to inform the inventory review, tracks by location and functional requirement—such as administrative or

  18. Intelligence Support to Personnel Recovery: Is USPACOM Ready for the Unexpected?

    DTIC Science & Technology

    2011-05-04

    REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 1...completing and reviewing this collection of information. Send comments regarding this burden estimate or any other aspect of this collection of...other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a

  19. A Design of Experiments Approach to Readiness Risk Analysis for Performance-Based Logistics

    DTIC Science & Technology

    2006-09-30

    valuing proposed improvements in component reliability. Sponsored report NPS-LM 05-008. Monterey, CA: Graduate School of Business and Public Policy...Postgraduate School aval Postgraduate School ase, distribution unlimited. School, Monterey, California 93943 ê~ã= pp=C=mr_if`=mlif`v= i= Report ...Documentation Page Form ApprovedOMB No. 0704-0188 Public reporting burden for the collection of information is estimated to average 1 hour per response

  20. Combat Readiness for the Modern Military Surgeon: Data from a Decade of Combat Operations

    DTIC Science & Technology

    2012-01-01

    93 (68%) have been deployed two or more times. More than 18,500 operative procedures were reported , with abdominal and soft tissue cases predominating...Illinois, in September 2011. Address for reprints: Joshua A. Tyler, MD, Department of General Surgery, San Antonio Military Medical Center, MCHE- SDG , 3851...Wilkins. Unauthorized reproduction of this article is prohibited. Report Documentation Page Form ApprovedOMB No. 0704-0188 Public reporting burden for

  1. An introduction to using the FORTRAN programs provided with Computational Nuclear Physics 1 Nuclear Structure

    NASA Technical Reports Server (NTRS)

    Boytos, Matthew A.; Norbury, John W.

    1992-01-01

    The authors of this paper have provided a set of ready-to-run FORTRAN programs that should be useful in the field of theoretical nuclear physics. The purpose of this document is to provide a simple synopsis of the programs and their use. A separate section is devoted to each program set and includes: abstract; files; compiling, linking, and running; obtaining results; and a tutorial.

  2. Demonstration of Advanced Technologies for Multi-Load Washers in Hospitality and Healthcare -- Wastewater Recycling Technology

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boyd, Brian K.; Parker, Graham B.; Petersen, Joseph M.

    The objective of this demonstration project was to evaluate market-ready retrofit technologies for reducing the energy and water use of multi-load washers in healthcare and hospitality facilities. Specifically, this project evaluated laundry wastewater recycling technology in the hospitality sector and ozone laundry technology in both the healthcare and hospitality sectors. This report documents the demonstration of a wastewater recycling system installed in the Grand Hyatt Seattle.

  3. Concept utilizing telex network for operational management requirements

    NASA Astrophysics Data System (ADS)

    Kowalczyk, E.

    1982-09-01

    The simplest and least expensive means ensuring fast transmission of documented (recorded) information on a country-wide scale for all kinds of users is the telex network, which is fully automated in Poland at this time (except for foreign message traffic) with more than 17,000 subscribers. As a digital network, the telex network constitutes, in principle, a base network that is ready for use to transmit information as part of remote data transmission systems.

  4. Logistics and Maintenance Options to Support the P-8A Poseidon’s Expeditionary Mission

    DTIC Science & Technology

    2010-06-01

    Equipment HOA Horn Of Africa ICD Initial Capabilities Document IFR In Flight Refueling ISR Intelligence Surveillance and Reconnaissance JOA...will transition to the new MPRF platform 18 one base and one squadron at a time beginning with the Fleet Readiness Squadron ( FRS ) and VP squadrons...and is equipped with in a universal aerial refueling receptacle that will provide In-Flight Refueling ( IFR ) capability. This new in-flight

  5. Milestone M3FT-15OR0203112. Build redesigned HFIR rabbit capsules and make ready for insertion for irradiation in HFIR

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Howard, Richard H; McDuffee, Joel Lee; Okuniewski, Maria A.

    2015-09-01

    This report details the fabrication and delivery of two Fuel Cycle Research and Development irradiation capsules (FCRP20 and FCRP03), with associated quality assurance documentation, to the High Flux Isotope Reactor. The capsules and documentation were delivered by September 30, 2015, thus meeting the deadline for milestone M3FT-15OR0203112. These irradiation experiments irradiate metal parallelepiped specimens that may consist of various compositions including uranium metal, steel, etc. This document contains a copy of the completed capsule fabrication request sheets, which detail all constituent components, pertinent drawings, etc., along with a detailed summary of the capsule assembly process performed by the Thermal Hydraulicsmore » and Irradiation Engineering Group (THIEG) in the Reactor and Nuclear Systems Division. A complete fabrication package record is maintained by THIEG and is available upon request.« less

  6. Sources of Variability in Chlorophyll Analysis by Fluorometry and High-Performance Liquid Chromatography in a SIMBIOS Inter-Calibration Exercise

    NASA Technical Reports Server (NTRS)

    VanHeukelem, Laurie; Thomas, Crystal S.; Gilbert, Patricia M.; Fargion, Giulietta S. (Editor); McClain, Charles R. (Editor)

    2002-01-01

    The purpose of this technical report is to provide current documentation of the Sensor Intercomparison and Merger for Biological and Interdisciplinary Oceanic Studies (SIMBIOS) Project activities, NASA Research Announcement (NRA) research status, satellite data processing, data product validation, and field calibration. This documentation is necessary to ensure that critical information is related to the scientific community and NASA management. This critical information includes the technical difficulties and challenges of validating and combining ocean color data from an array of independent satellite systems to form consistent and accurate global bio-optical time series products. This technical report is not meant as a substitute for scientific literature. Instead, it will provide a ready and responsive vehicle for the multitude of technical reports issued by an operational project. This particular document focus on the variability in chlorophyll pigment measurements resulting from differences in methodologies and laboratories conducting the pigment analysis.

  7. Enhancing the many-to-many relations across IHE document sharing communities.

    PubMed

    Ribeiro, Luís S; Costa, Carlos; Oliveira, José Luís

    2012-01-01

    The Integrating Healthcare Enterprise (IHE) initiative is an ongoing project aiming to enable true inter-site interoperability in the health IT field. IHE is a work in progress and many challenges need to be overcome before the healthcare Institutions may share patient clinical records transparently and effortless. Configuring, deploying and testing an IHE document sharing community requires a significant effort to plan and maintain the supporting IT infrastructure. With the new paradigm of cloud computing is now possible to launch software devices on demand and paying accordantly to the usage. This paper presents a framework designed with purpose of expediting the creation of IHE document sharing communities. It provides semi-ready templates of sharing communities that will be customized according the community needs. The framework is a meeting point of the healthcare institutions, creating a favourable environment that might converge in new inter-institutional professional relationships and eventually the creation of new Affinity Domains.

  8. 75 FR 4537 - Notice of Public Hearings for the Draft Environmental Impact Statement for the Silver Strand...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-28

    ... training activities within the Navy's Silver Strand Training Complex (SSTC) and southern nearshore areas of... activities, introduction of new platforms and equipment for training, and increased access and availability... readiness using the SSTC to support and conduct current, emerging, and future training activities. A Notice...

  9. 77 FR 51022 - Clark Canyon Hydro, LLC; Notice of Application Accepted for Filing, Ready for Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12429-007] Clark Canyon... b. Project No.: 12429-007. c. Date Filed: May 31, 2012. d. Applicant: Clark Canyon Hydro, LLC . e. Name of Project: Clark Canyon Dam Hydroelectric Project. f. Location: When constructed, the project...

  10. 75 FR 4364 - Slatersville Hydro, LLC; Notice of Application Ready for Environmental Analysis, and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-27

    ... Conditions, Recommendations, and Prescriptions and Waiving Scoping January 20, 2010. Take notice that the..., recommendations, terms and conditions, and prescriptions: 60 days from the issuance date of this notice; reply... conditions, and prescriptions may be filed electronically via the Internet in lieu of paper. The Commission...

  11. 76 FR 12719 - City of Escondido, California, and Vista Irrigation District; Notice of Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-08

    ..., California, and Vista Irrigation District; Notice of Application Accepted for Filing, Ready for Environmental... Filed: December 3, 2010. d. Applicant: City of Escondido, California, (Escondido) and Vista Irrigation District (Vista). e. Name of Project: Bear Valley Powerhouse Project. f. Location: On the San Luis Rey...

  12. 76 FR 12720 - City of Escondido, CA, and Vista Irrigation District; Notice of Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-08

    ..., CA, and Vista Irrigation District; Notice of Application Accepted for Filing, Ready for Environmental...: City of Escondido, California (Escondido) and Vista Irrigation District (Vista). e. Name of Project... owned by the La Jolla, San Pasqual, and Rincon Indian Tribes. g. Filed Pursuant to: Federal Power Act...

  13. 78 FR 59919 - Pershing County Water Conservation District; Notice of Application Accepted for Filing With the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-30

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14327-000] Pershing County Water Conservation District; Notice of Application Accepted for Filing With the Commission, Intent to Waive Scoping, Soliciting Motions to Intervene and Protests, Ready For Environmental Analysis, and Soliciting Comments, Terms and Conditions,...

  14. 75 FR 4362 - Green Island Power Authority; Notice of Application Ready for Environmental Analysis, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-27

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13-023] Green Island Power... inspection. a. Type of Application: New Major License. b. Project No.: 13-023. c. Date Filed: March 2, 2009. d. Applicant: Green Island Power Authority. e. Name of Project: Green Island Hydroelectric Project...

  15. The Development of an Instrument to Measure School Readiness for a Prevention Program

    ERIC Educational Resources Information Center

    Dymnicki, Allison B.; Henry, David B.; Myford, Carol M.

    2015-01-01

    There is a need to understand how environmental characteristics of a school influence the effectiveness of prevention efforts. Although researchers have discussed the importance of conducting needs assessments before implementing interventions, few of these types of assessments focus on the relational aspect. Furthermore, few assessments have the…

  16. SRS Geology/Hydrogeology Environmental Information Document

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Denham, M.E.

    1999-08-31

    The purpose of the Savannah River Site Geology and Hydrogeology Environmental Information Document (EID) is to provide geologic and hydrogeologic information to serve as a baseline to evaluate potential environmental impacts. This EID is based on a summary of knowledge accumulated from research conducted at the Savannah River Site (SRS) and surrounding areas.

  17. 7 CFR 372.9 - Processing and use of environmental documents.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 5 2011-01-01 2011-01-01 false Processing and use of environmental documents. 372.9 Section 372.9 Agriculture Regulations of the Department of Agriculture (Continued) ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE NATIONAL ENVIRONMENTAL POLICY ACT IMPLEMENTING PROCEDURES § 372...

  18. 7 CFR 372.9 - Processing and use of environmental documents.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 5 2014-01-01 2014-01-01 false Processing and use of environmental documents. 372.9 Section 372.9 Agriculture Regulations of the Department of Agriculture (Continued) ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE NATIONAL ENVIRONMENTAL POLICY ACT IMPLEMENTING PROCEDURES § 372...

  19. 7 CFR 372.9 - Processing and use of environmental documents.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 5 2012-01-01 2012-01-01 false Processing and use of environmental documents. 372.9 Section 372.9 Agriculture Regulations of the Department of Agriculture (Continued) ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE NATIONAL ENVIRONMENTAL POLICY ACT IMPLEMENTING PROCEDURES § 372...

  20. 18 CFR 707.7 - Ensuring that environmental documents are actually considered in agency decisionmaking.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 2 2014-04-01 2014-04-01 false Ensuring that... Power and Water Resources WATER RESOURCES COUNCIL COMPLIANCE WITH THE NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) Water Resources Council Implementing Procedures § 707.7 Ensuring that environmental documents are...

  1. 18 CFR 707.7 - Ensuring that environmental documents are actually considered in agency decisionmaking.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Ensuring that... Power and Water Resources WATER RESOURCES COUNCIL COMPLIANCE WITH THE NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) Water Resources Council Implementing Procedures § 707.7 Ensuring that environmental documents are...

  2. 18 CFR 707.7 - Ensuring that environmental documents are actually considered in agency decisionmaking.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 2 2011-04-01 2011-04-01 false Ensuring that... Power and Water Resources WATER RESOURCES COUNCIL COMPLIANCE WITH THE NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) Water Resources Council Implementing Procedures § 707.7 Ensuring that environmental documents are...

  3. 18 CFR 707.7 - Ensuring that environmental documents are actually considered in agency decisionmaking.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 2 2012-04-01 2012-04-01 false Ensuring that... Power and Water Resources WATER RESOURCES COUNCIL COMPLIANCE WITH THE NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) Water Resources Council Implementing Procedures § 707.7 Ensuring that environmental documents are...

  4. 18 CFR 707.7 - Ensuring that environmental documents are actually considered in agency decisionmaking.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 2 2013-04-01 2012-04-01 true Ensuring that... Power and Water Resources WATER RESOURCES COUNCIL COMPLIANCE WITH THE NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) Water Resources Council Implementing Procedures § 707.7 Ensuring that environmental documents are...

  5. 29 CFR 11.11 - Development of environmental analyses and documents.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... development indicates that preparation of an environmental impact statement will be required, the agency shall begin preparation of such a document by initiating the scoping process in accordance with 40 CFR 1501.7. However, if the information is not clearly indicative of the need for preparation of an environmental...

  6. 45 CFR 641.20 - Notification of the availability of environmental documents and other information.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 3 2014-10-01 2014-10-01 false Notification of the availability of environmental documents and other information. 641.20 Section 641.20 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION ENVIRONMENTAL ASSESSMENT PROCEDURES FOR PROPOSED NATIONAL SCIENCE...

  7. 45 CFR 641.20 - Notification of the availability of environmental documents and other information.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Notification of the availability of environmental documents and other information. 641.20 Section 641.20 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION ENVIRONMENTAL ASSESSMENT PROCEDURES FOR PROPOSED NATIONAL SCIENCE...

  8. 45 CFR 641.20 - Notification of the availability of environmental documents and other information.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 3 2012-10-01 2012-10-01 false Notification of the availability of environmental documents and other information. 641.20 Section 641.20 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION ENVIRONMENTAL ASSESSMENT PROCEDURES FOR PROPOSED NATIONAL SCIENCE...

  9. 45 CFR 641.20 - Notification of the availability of environmental documents and other information.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 3 2013-10-01 2013-10-01 false Notification of the availability of environmental documents and other information. 641.20 Section 641.20 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION ENVIRONMENTAL ASSESSMENT PROCEDURES FOR PROPOSED NATIONAL SCIENCE...

  10. 45 CFR 641.20 - Notification of the availability of environmental documents and other information.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 3 2011-10-01 2011-10-01 false Notification of the availability of environmental documents and other information. 641.20 Section 641.20 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION ENVIRONMENTAL ASSESSMENT PROCEDURES FOR PROPOSED NATIONAL SCIENCE...

  11. 18 CFR 5.24 - Applications not requiring a draft NEPA document.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... requiring a draft NEPA document. 5.24 Section 5.24 Conservation of Power and Water Resources FEDERAL ENERGY... APPLICATION PROCESS § 5.24 Applications not requiring a draft NEPA document. (a) If the Commission determines... environmental impact statement and that a draft environmental assessment will not be required, the Commission...

  12. 18 CFR 5.24 - Applications not requiring a draft NEPA document.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... requiring a draft NEPA document. 5.24 Section 5.24 Conservation of Power and Water Resources FEDERAL ENERGY... APPLICATION PROCESS § 5.24 Applications not requiring a draft NEPA document. (a) If the Commission determines... environmental impact statement and that a draft environmental assessment will not be required, the Commission...

  13. 18 CFR 5.24 - Applications not requiring a draft NEPA document.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... requiring a draft NEPA document. 5.24 Section 5.24 Conservation of Power and Water Resources FEDERAL ENERGY... APPLICATION PROCESS § 5.24 Applications not requiring a draft NEPA document. (a) If the Commission determines... environmental impact statement and that a draft environmental assessment will not be required, the Commission...

  14. 76 FR 19309 - Solicitation of Letters of Interest To Participate in National Environmental Policy Act Pilot...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-07

    ... environmental analyses and documents required under NEPA to determine the extent to which these approaches improve the quality, timeliness, and cost effectiveness of such analyses and documents. The pilot project will focus only on NEPA analyses and documents associated with petitions for nonregulated status for GE...

  15. 50 CFR 530.2 - Ensuring that environmental documents are actually considered in agency decision-making.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... actually considered in agency decision-making. 530.2 Section 530.2 Wildlife and Fisheries MARINE MAMMAL... documents are actually considered in agency decision-making. Section 1505.1 of the NEPA regulations contains requirements to ensure adequate consideration of environmental documents in agency decision-making. To...

  16. Stage 1 of the meaningful use incentive program for electronic health records: a study of readiness for change in ambulatory practice settings in one integrated delivery system.

    PubMed

    Shea, Christopher M; Reiter, Kristin L; Weaver, Mark A; McIntyre, Molly; Mose, Jason; Thornhill, Jonathan; Malone, Robb; Weiner, Bryan J

    2014-12-14

    Meaningful Use (MU) provides financial incentives for electronic health record (EHR) implementation. EHR implementation holds promise for improving healthcare delivery, but also requires substantial changes for providers and staff. Establishing readiness for these changes may be important for realizing potential EHR benefits. Our study assesses whether provider/staff perceptions about the appropriateness of MU and their departments' ability to support MU-related changes are associated with their reported readiness for MU-related changes. We surveyed providers and staff representing 47 ambulatory practices within an integrated delivery system. We assessed whether respondent's role and practice-setting type (primary versus specialty care) were associated with reported readiness for MU (i.e., willingness to change practice behavior and ability to document actions for MU) and hypothesized predictors of readiness (i.e., perceived appropriateness of MU and department support for MU). We then assessed associations between reported readiness and the hypothesized predictors of readiness. In total, 400 providers/staff responded (response rate approximately 25%). Individuals working in specialty settings were more likely to report that MU will divert attention from other patient-care priorities (12.6% vs. 4.4%, p = 0.019), as compared to those in primary-care settings. As compared to advanced-practice providers and nursing staff, physicians were less likely to have strong confidence in their department's ability to solve MU implementation problems (28.4% vs. 47.1% vs. 42.6%, p = 0.023) and to report strong willingness to change their work practices for MU (57.9% vs. 83.3% vs. 82.0%, p < 0.001). Finally, provider/staff perceptions about whether MU aligns with departmental goals (OR = 3.99, 95% confidence interval (CI) = 2.13 to 7.48); MU will divert attention from other patient-care priorities (OR = 2.26, 95% CI = 1.26 to 4.06); their department will support MU-related change efforts (OR = 3.99, 95% CI = 2.13 to 7.48); and their department will be able to solve MU implementation problems (OR = 2.26, 95% CI = 1.26 to 4.06) were associated with their willingness to change practice behavior for MU. Organizational leaders should gauge provider/staff perceptions about appropriateness and management support of MU-related change, as these perceptions might be related to subsequent implementation.

  17. Effect of test concentration in the ready biodegradability test for chemical substances: Improvement of OECD test guideline 301C.

    PubMed

    Nabeoka, Ryosuke; Taruki, Masanori; Kayashima, Takakazu; Yoshida, Tomohiko; Kameya, Takashi

    2016-01-01

    In Japan, understanding the environmental persistence of chemicals is very important for risk assessment, and ready biodegradability tests are mainly conducted according to the Organisation for Economic Co-operation and Development test guideline 301C. However, the highest test concentration specified in test guideline 301C, 100 mg/L, may cause microbial toxicity and incomplete biodegradation. The authors performed test guideline 301C tests at test concentrations of 30 mg/L for 13 substances that were readily biodegradable in ready biodegradability tests but not in test guideline 301C tests. Of the 5 substances with potential to cause microbial toxicity at 100 mg/L, the percentage of biodegradation of sodium dimethyldithiocarbamate, 4-chloro-3-cresol (CC), thymol (THY), and p-tert-butyl-α-methylbenzenepropionaldehyde measured by biochemical oxygen demand (BOD) increased in the test guideline 301C test at 30 mg/L, suggesting a reduction in toxicity effects. Furthermore, CC and THY met the criteria for ready biodegradability, which are more than 60% of biodegradation by BOD and a 10-d window. Of the 8 substances with a low potential for causing microbial toxicity at 100 mg/L, the percentage of biodegradation of only 2-(diethylamino)ethanol increased in the test guideline 301C test at 30 mg/L. Employing a lower test concentration in the standard test guideline 301C test will contribute to improvement of consistency between results of a test guideline 301C test and other ready biodegradability tests. © 2015 SETAC.

  18. Combining Motivational and Physical Intervention Components to Promote Fall-Reducing Physical Activity Among Community-Dwelling Older Adults: A Feasibility Study.

    PubMed

    McMahon, Siobhan Kathleen; Wyman, Jean F; Belyea, Michael J; Shearer, Nelma; Hekler, Eric B; Fleury, Julie

    2016-11-01

    To assess the feasibility of a new intervention, Ready~Steady, in terms of demand, acceptability, implementation, and limited efficacy. Randomized controlled trial; repeated measures. Two rural communities in Itasca County, Minnesota. Thirty participants were randomized to an intervention (n = 16) or attention-control (n = 14) group. Ready~Steady combined two components: (1) motivational (motivational support, social network support, empowering education), and (2) fall-reducing physical activities (PAs; guidance to practice leg-strengthening, balance, and flexibility activities and walking). Acceptability questionnaire and Indices of Procedural Consistency (investigator developed), Community Health Activity Model Program for Seniors Questionnaire (confirmed with accelerometry), Short Physical Performance Battery, Perceived Environmental Support Scale, Social Support for Exercise Questionnaire, Goal Attainment Scale, Index of Readiness, and Index of Self-Regulation. Descriptive statistics and a marginal approach to repeated-measures analysis of variance, using mixed-model procedures. Attrition was 7% and mean attendance was 7.2 of 8 sessions, participants evaluated Ready~Steady as acceptable, and implementation fidelity was good. The intervention group improved significantly more than the attention-control group in PA behavior, F 1,27 = 11.92, p = .002; fall risk (functional balance and strength), F 1,27 = 14.89, p = .001; support for exercise from friends, F 1,27 = 11.44, p = .002; and self-regulation, F 1,26 = 38.82, p < .005. The Ready~Steady intervention was feasible as evidenced by low attrition and good attendance and implementation, as well as positive effects on targeted outcomes and theoretical mechanisms of change. © 2016 by American Journal of Health Promotion, Inc.

  19. DOE Zero Energy Ready Home Case Study: Amaris Custom Homes, St. Paul, Minnesota

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    For this project, Amaris worked with U.S. Department of Energy (DOE) team, NorthernSTAR Building America Partnership, to develop the first Zero Energy Ready Home (ZERH) in Minnesota's cold climate using reasonable, cost-effective, and replicable construction materials and practices. The result is a passive solar, super-efficient 3542-ft2 walkout ranch-style home with all the creature comforts. Along with meeting ZERH standards, Amaris also achieved certifications for Leadership in Energy & Environmental Design for Homes v4, MN Green Path Emerald, and a Builders Association of the Twin Cities Reggie Award of Excellence. The home achieves a HERS score of 41 without photovoltaics; withmore » PV, the home achieves a HERS score of 5.« less

  20. 43 CFR 46.315 - How to format an environmental assessment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... planning, decision-making, and appropriate public participation. (b) An environmental assessment may be accompanied by any other planning or decision-making document. The portion of the document that analyzes the...

  1. ENVIRONMENTAL INFORMATION MANAGEMENT SYSTEM (EIMS)

    EPA Science Inventory

    The Environmental Information Management System (EIMS) organizes descriptive information (metadata) for data sets, databases, documents, models, projects, and spatial data. The EIMS design provides a repository for scientific documentation that can be easily accessed with standar...

  2. 77 FR 57581 - Environmental Documents Prepared for Oil, Gas, and Mineral Operations by the Gulf of Mexico Outer...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-18

    ... DEPARTMENT OF THE INTERIOR Bureau of Ocean Energy Management Environmental Documents Prepared for Oil, Gas, and Mineral Operations by the Gulf of Mexico Outer Continental Shelf (OCS) Region AGENCY: Bureau of Ocean Energy Management (BOEM), Interior. ACTION: Notice of the availability of environmental...

  3. 77 FR 34405 - Environmental Documents Prepared for Oil, Gas, and Mineral Operations by the Gulf of Mexico Outer...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-11

    ... DEPARTMENT OF THE INTERIOR Bureau of Ocean Energy Management Environmental Documents Prepared for Oil, Gas, and Mineral Operations by the Gulf of Mexico Outer Continental Shelf (OCS) Region AGENCY: Bureau of Ocean Energy Management (BOEM), Interior. ACTION: Notice of the availability of environmental...

  4. 77 FR 74213 - Environmental Documents Prepared for Oil, Gas, and Mineral Operations by the Gulf of Mexico Outer...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-13

    ... DEPARTMENT OF THE INTERIOR Bureau of Ocean Energy Management Environmental Documents Prepared for Oil, Gas, and Mineral Operations by the Gulf of Mexico Outer Continental Shelf (OCS) Region AGENCY: Bureau of Ocean Energy Management (BOEM), Interior. ACTION: Notice of the availability of environmental...

  5. 77 FR 18263 - Environmental Documents Prepared for Proposed Oil, Gas, and Mineral Operations by the Gulf of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-27

    ... DEPARTMENT OF THE INTERIOR Bureau of Ocean Energy Management Environmental Documents Prepared for Proposed Oil, Gas, and Mineral Operations by the Gulf of Mexico Outer Continental Shelf (OCS) Region AGENCY: Bureau of Ocean Energy Management, Interior. ACTION: Notice of the availability of Environmental...

  6. 10 CFR 51.123 - Charges for environmental documents; distribution to public; distribution to governmental agencies.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Charges for environmental documents; distribution to public; distribution to governmental agencies. 51.123 Section 51.123 Energy NUCLEAR REGULATORY COMMISSION... National Environmental Policy Act-Regulations Implementing Section 102(2) Public Notice of and Access to...

  7. 10 CFR 51.123 - Charges for environmental documents; distribution to public; distribution to governmental agencies.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Charges for environmental documents; distribution to public; distribution to governmental agencies. 51.123 Section 51.123 Energy NUCLEAR REGULATORY COMMISSION... National Environmental Policy Act-Regulations Implementing Section 102(2) Public Notice of and Access to...

  8. 10 CFR 51.123 - Charges for environmental documents; distribution to public; distribution to governmental agencies.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Charges for environmental documents; distribution to public; distribution to governmental agencies. 51.123 Section 51.123 Energy NUCLEAR REGULATORY COMMISSION... National Environmental Policy Act-Regulations Implementing Section 102(2) Public Notice of and Access to...

  9. 10 CFR 51.123 - Charges for environmental documents; distribution to public; distribution to governmental agencies.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Charges for environmental documents; distribution to public; distribution to governmental agencies. 51.123 Section 51.123 Energy NUCLEAR REGULATORY COMMISSION... National Environmental Policy Act-Regulations Implementing Section 102(2) Public Notice of and Access to...

  10. SIMBIOS Project 1999 Annual Report

    NASA Technical Reports Server (NTRS)

    McClain, Charles R.; Fargion, Giulietta S.

    1999-01-01

    The purpose of this technical memorandum is to provide current documentation of the Sensor Intercomparison and Merger for Biological and Interdisciplinary Oceanic Studies (SIMBIOS) Project activities, NASA Research Announcement (NRA) research status, satellite data processing, data product validation, and field calibration. This documentation is necessary to ensure that critical information is related to the scientific community and NASA management. This critical information includes the technical difficulties and challenges of combining ocean color data from an array of independent satellite systems to form consistent and accurate global bio-optical time series products. This technical report is not meant as a substitute for scientific literature. Instead, it will provide a ready and responsive vehicle for the multitude of technical reports issued by an operational project.

  11. SIMBIOS Project 1998 Annual Report

    NASA Technical Reports Server (NTRS)

    McClain, Charles R.; Fargion, Giulietta, S.

    1999-01-01

    The purpose of this series of technical reports is to provide current documentation of the Sensor Intercomparison and Merger for Biological and Interdisciplinary Ocean Studies (SIMBIOS) Project activities, NASA Research Announcement (NRA) research status, satellite data processing, data product validation and field calibration. This documentation is necessary to ensure that critical information is related to the scientific community and NASA management. This critical information includes the technical difficulties and challenges of combining ocean color data from an array of independent satellite systems to form consistent and accurate global bio-optical time series products. This technical report is not meant to substitute for scientific literature. Instead, it will provide a ready and responsive vehicle for the multitude of technical reports issues by an operational project.

  12. Photovoltaic system criteria documents. Volume 4: Review criteria for photovoltaic applications

    NASA Technical Reports Server (NTRS)

    Koenig, John C.; Billitti, Joseph W.; Tallon, John M.

    1979-01-01

    Guidelines are provided for the organization, preparation and conduct of program reviews for photovoltaic applications. These criteria apply to all photovoltaic applications. They include, but are not limited to, the following: (1) Conceptual design review; (2) Preliminary design review; (3) Critical design review; and (4) Operational readiness review. Contract goal's and objectives are met through program monitoring for cost, schedule, and performance for both managerial and technical elements for all PV applications activities.

  13. Measuring the Value of Renewal: Age, Operational Tempo, Deployment, and Reset Effects on the Readiness and Maintenance Costs of Army Vehicles

    DTIC Science & Technology

    2013-01-01

    policy and decisionmaking through research and analysis . This electronic document was made available from www.rand.org as a public service of the...through research and analysis . RAND’s publications do not necessarily reflect the opinions of its research clients and sponsors. R® is a registered...vehicle usage, location, and field maintenance records from the Army Materiel Systems Analysis Activity (AMSAA) Sample Data Collection (SDC) program

  14. Group Centric Information Sharing Using Hierarchical Models

    DTIC Science & Technology

    2011-01-01

    enable people to create data using RDF, build vocabularies using web ontology language (OWL), write rules and query data stores using SPARQL [8...a strict joined and the document was added with a strict add. In order to represent the fact that an action is allowed (or not), we have created a...greatly improve the system’s readiness to handle any number of access decision queries . a. The pair is tested against the gSIS Join and Add semantics

  15. DURIP: An Ultrafast Testbed for Comprehensive Characterization of Photonics, Electronic, and Optoelectronic Properties of Inegrated Nanophotonic Structures

    DTIC Science & Technology

    2017-10-14

    Department of the Army position, policy or decision , unless so designated by other documentation. 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS (ES...characterization equipment to an al- ready available photonic characterization setup. The following table details of the spent budget and the list of purchased ...measure the response of a high-speed optical signal processing platform. The same architecture also can be used to charac- terize high-speed

  16. The DELTA PREP Initiative: Accelerating Coalition Capacity for Intimate Partner Violence Prevention

    PubMed Central

    Zakocs, Ronda; Freire, Kimberley E.

    2018-01-01

    Background The DELTA PREP Project aimed to build the prevention capacity of 19 state domestic violence coalitions by offering eight supports designed to promote prevention integration over a 3-year period: modest grant awards, training events, technical assistance, action planning, coaching hubs, the Coalition Prevention Capacity Assessment, an online workstation, and the online documentation support system. Objectives Using quantitative and qualitative data, we sought to explain how coalitions integrated prevention within their structures and functions and document how DELTA PREP supports contributed to coalitions’ integration process. Results We found that coalitions followed a common pathway to integrate prevention. First, coalitions exhibited precursors of organizational readiness, especially having prevention champions. Second, coalitions engaged in five critical actions: engaging in dialogue, learning about prevention, forming teams, soliciting input from the coalition, and action planning. Last, by engaging in these critical actions, coalitions enhanced two key organizational readiness factors—developing a common understanding of prevention and an organizational commitment to prevention. We also found that DELTA PREP supports contributed to coalitions’ abilities to integrate prevention by supporting learning about prevention, fostering a prevention team, and engaging in action planning by leveraging existing opportunities. Two DELTA PREP supports—coaching hubs and the workstation—did not work as initially intended. From the DELTA PREP experience, we offer several lessons to consider when designing future prevention capacity-building initiatives. PMID:26245934

  17. The DELTA PREP Initiative: Accelerating Coalition Capacity for Intimate Partner Violence Prevention.

    PubMed

    Zakocs, Ronda; Freire, Kimberley E

    2015-08-01

    The DELTA PREP Project aimed to build the prevention capacity of 19 state domestic violence coalitions by offering eight supports designed to promote prevention integration over a 3-year period: modest grant awards, training events, technical assistance, action planning, coaching hubs, the Coalition Prevention Capacity Assessment, an online workstation, and the online documentation support system. Using quantitative and qualitative data, we sought to explain how coalitions integrated prevention within their structures and functions and document how DELTA PREP supports contributed to coalitions' integration process. We found that coalitions followed a common pathway to integrate prevention. First, coalitions exhibited precursors of organizational readiness, especially having prevention champions. Second, coalitions engaged in five critical actions: engaging in dialogue, learning about prevention, forming teams, soliciting input from the coalition, and action planning. Last, by engaging in these critical actions, coalitions enhanced two key organizational readiness factors-developing a common understanding of prevention and an organizational commitment to prevention. We also found that DELTA PREP supports contributed to coalitions' abilities to integrate prevention by supporting learning about prevention, fostering a prevention team, and engaging in action planning by leveraging existing opportunities. Two DELTA PREP supports-coaching hubs and the workstation-did not work as initially intended. From the DELTA PREP experience, we offer several lessons to consider when designing future prevention capacity-building initiatives. © 2015 Society for Public Health Education.

  18. Format and style for environmental documents prepared as part of the Uranium Mill Tailings Remedial Action Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1980-06-01

    The Uranium Mill Tailings Remedial Action Program will require the preparation of several environmental impact statements and several environmental assessments. This guide begins with a section describing in general terms the efforts required to make these documents readable. The sections describe the formats to be used for the pages, headings, front matter, footnotes, lists, figures, tables, references, glossaries, indexes, and appendixes in these documents. A final section presents some rules of style to be followed in writing the texts.

  19. Format and style for environmental documents prepared as part of the Uranium Mill Tailings Remedial Action Program. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1980-06-01

    The Uranium Mill Tailings Remedial Action Program will require the preparation of several environmental impact statements and several environmental assessments. This guide begins with a section describing in general terms the efforts required to make these documents readable. The sections describe the formats to be used for the pages, headings, front matter, footnotes, lists, figures, tables, references, glossaries, indexes, and appendixes in these documents. A final section presents some rules of style to be followed in writing the texts.

  20. Learning How To Learn: An Affective Curriculum for Students at Risk of Dropping Out of School.

    ERIC Educational Resources Information Center

    Turner, Thom

    Environmental Readiness Learning (ERL) is the affective curriculum component developed by the Bedford Stuyvesant Street Academy (New York) to improve the behavior, academic achievement, and self-esteem of urban high school students with histories of prior school failure. The program design reflects the school's philosophy that educational success…

  1. 76 FR 31955 - Jonathan and Jayne Chase; Notice of Application Accepted for Filing With the Commission, Intent...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-02

    .... c. Date filed: July 23, 2010. d. Applicant: Jonathan and Jayne Chase. e. Name of Project: Troy Hydropower Project. f. Location: On the Missisquoi River, in the Town of Troy, Orleans County, Vermont. The... filing and is now ready for environmental analysis. l. Project Description: The Troy Project would...

  2. 76 FR 35873 - Blue Heron Hydro LLC; Notice of Application Ready for Environmental Analysis and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Project No. 13226-003] Blue Heron Hydro... Major License. b. Project No.: 13226-003. c. Date filed: November 1, 2010. d. Applicant: Blue Heron..., Blue Heron Hydro LLC, 113 Bartlett Road, Plainfield, Vermont 05667. (802) 454-1874. i. FERC Contact: Dr...

  3. 76 FR 35875 - Blue Heron Hydro LLC; Notice of Application Ready for Environmental Analysis and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13368-002] Blue Heron Hydro... Minor License. b. Project No.: 13368-002. c. Date filed: November 1, 2010. d. Applicant: Blue Heron.... Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825(r). h. Applicant Contact: Lori Barg, Blue...

  4. Resilience Planning Approaches “Ready-to-Use”: Lessons from EPA Partnerships. How to work with a community to design a nature-based hazard mitigation project

    EPA Science Inventory

    A fast-paced delivery of approaches developed in EPA partnerships to enable effective inclusion of environmental and social resilience into hazard mitigation planning. This presentation will cover a broad spectrum, from 1) EPA’s role in mitigation, 2) what a Regional Resil...

  5. Teacher College Students' Views of Controversial Environmental Issues: Ambivalence and Readiness to Adopt a Stance

    ERIC Educational Resources Information Center

    Weinberger, Yehudith; Dreyfus, Amos

    2013-01-01

    One of the most important goals of discussing controversial issues in the classroom is to educate students to possess an inclination towards reason, open mindedness and fairness. However, research tends to show that teachers are not adequately trained to lead fruitful discussions about controversial issues and do not possess the necessary skills…

  6. Final Environmental Impact Statement for the Closure (Withdrawal of Units) of Norton Air Force Base, California

    DTIC Science & Technology

    1990-07-01

    and Wildlife Resources .............................. 3-25 3.3.2 Threatened and Endangered Species ............................. 3-27 3.4 Human ... Human Environment ................................................ 4-10 4.3.1 Archaeological, Cultural, and Historic Resources ................. 4-10...functional safety manager , AFISC, provides Air Force agencies an assessment of their fighting and medical readiness and their resource management

  7. 78 FR 31909 - Notice of Intent To Prepare an Environmental Impact Statement for Military Readiness Activities...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-28

    ... Radars and Surface to Air Missile systems and emulators; and instrumentation facilities. The DoN is... preparation of the EIS. Dates and Addresses: Four open house information sessions will be held between 5:00 p... Town Hall, 135 Court Street, Austin, Nevada 89310. Each of the four open house information sessions...

  8. User's Guide to OASIS, Oceanic and Atmospheric Scientific Information System. Key to Oceanic and Atmospheric Information Sources No. 1.

    ERIC Educational Resources Information Center

    National Oceanic and Atmospheric Administration (DOC), Washington, DC. Environmental Data Service.

    OASIS (Oceanic and Atmospheric Scientific Information System) is an information retrieval service that furnishes ready reference to the technical literature and research efforts concerning the environmental sciences and marine and coastal resources. It provides computerized searches of both NOAA (National Oceanic and Atmospheric Administration)…

  9. 75 FR 62516 - Northern Illinois Hydropower, LLC; Notice of Application Ready for Environmental Analysis and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-12

    ...: Northern Illinois Hydropower, LLC. e. Name of Project: Dresden Island Project. f. Location: U.S. Army Corps of Engineers' Dresden Island Lock and Dam on the Illinois River, in the Town of Morris, Grundy County... Description: The Dresden Island Project would utilize the Corps of Engineers' existing Dresden Island Lock and...

  10. Environmental assessments and findings of no significant impact--FDA. Notice.

    PubMed

    1998-05-18

    The Food and Drug Administration (FDA) is announcing that it has reviewed environmental assessments (EA's) and issued findings of no significant impact (FONSI's) relating to the 167 new drug applications (NDA's) and supplemental applications listed in this document. FDA is publishing this notice because Federal regulations require public notice of the availability of environmental documents.

  11. QuEST: Qualifying Environmentally Sustainable Technologies. Vol. 3

    NASA Technical Reports Server (NTRS)

    Lewis, Pattie (Editor)

    2008-01-01

    This is an exciting new chapter for the NASA Technology Evaluation for Environmental Risk Mitigation Principal Center (TEERM). The Principal Center's past successes have created new opportunities for partnership and technology implementation. TEERM is continuing to support the current NASA Programs while reaching out and offering our assistance and experience to Constellation. NASA has also assumed Chairmanship responsibility of the Joint Group on Pollution Prevention (JG-PP) and Chairmanship of the JG-PP Working Group (WG). Both JG-PP and TEERM strive to improve mission readiness and reduce risk to personnel and assets by solving joint problems through cooperation. JG-PP and TEERM not only show our commitment to environmental stewardship, but also our commitment to fiscal responsibility.

  12. EVermont Renewable Hydrogen Production and Transportation Fueling System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Garabedian, Harold T.

    2008-03-30

    A great deal of research funding is being devoted to the use of hydrogen for transportation fuel, particularly in the development of fuel cell vehicles. When this research bears fruit in the form of consumer-ready vehicles, will the fueling infrastructure be ready? Will the required fueling systems work in cold climates as well as they do in warm areas? Will we be sure that production of hydrogen as the energy carrier of choice for our transit system is the most energy efficient and environmentally friendly option? Will consumers understand this fuel and how to handle it? Those are questions addressedmore » by the EVermont Wind to Wheels Hydrogen Project: Sustainable Transportation. The hydrogen fueling infrastructure consists of three primary subcomponents: a hydrogen generator (electrolyzer), a compression and storage system, and a dispenser. The generated fuel is then used to provide transportation as a motor fuel. EVermont Inc., started in 1993 by then governor Howard Dean, is a public-private partnership of entities interested in documenting and advancing the performance of advanced technology vehicles that are sustainable and less burdensome on the environment, especially in areas of cold climates, hilly terrain and with rural settlement patterns. EVermont has developed a demonstration wind powered hydrogen fuel producing filling system that uses electrolysis, compression to 5000 psi and a hydrogen burning vehicle that functions reliably in cold climates. And that fuel is then used to meet transportation needs in a hybrid electric vehicle whose internal combustion engine has been converted to operate on hydrogen Sponsored by the DOE EERE Hydrogen, Fuel Cells & Infrastructure Technologies (HFC&IT) Program, the purpose of the project is to test the viability of sustainably produced hydrogen for use as a transportation fuel in a cold climate with hilly terrain and rural settlement patterns. Specifically, the project addresses the challenge of building a renewable transportation energy capable system. The prime energy for this project comes from an agreement with a wind turbine operator.« less

  13. U.S. District Court, District of Oregon, Order, Oregon Environmental Council and the Sierra Club v. Oregon Department on Environmental Quality

    EPA Pesticide Factsheets

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  14. Impact of GDP, spending on R&D, the number of universities and scientific journals on research publications in environmental sciences in the Middle East.

    PubMed

    Meo, Sultan Ayoub; Al Masri, Abeer A; Usmani, Adnan Mahmood; Halepoto, Dost Muhammad

    2013-10-01

    This study aimed to assess the impact of the Gross Domestic Product (GDP), spending on Research and Development (R&D), the number of universities and scientific journals on the published research documents, citable documents, citations per document and H-index in environmental sciences in the Middle East countries. All the 16 Middle East countries were included in the study. Information regarding the GDP, spending on R&D, the total number of universities and indexed journals was collected. Total number of research documents (papers), citable documents, citations per document and H-index in environmental sciences during the period 1996-2011 was recorded. The study used the World Bank, SCI-mago/Scopus, Web of Science, Journal Citation Reports (Thomson Reuters) as the main sources of information. The mean GDP per capita of all the Middle East countries amounted to 18 125.49±5386.28 US$, spending on R&D was 0.63±0.28 US$, the number of universities equaled 36.56±11.33 and mean ISI indexed journals amounted to 8.25±3.93. The mean number of research documents published in environmental sciences in the Middle East countries during the period 1996-2011 was 2202.12±883.98; citable documents: 2156.87±865.09; citations per document: 8.74±0.73; and the H-index: 35.37±6.17. There was a positive correlation between the money spent on R&D and citations per documents (r = 0.6, p = 0.01), H-Index (r = 0.6, p = 0.01); the number of universities and a total of research documents (r = 0.65, p = 0.006), citable documents (r = 0.65, p = 0.006), H-Index (r = 0.50, p = 0.04), as well as ISI indexed journals and total research documents (r = 0.94, p = 0.0001), citable documents (r = 0.94, p = 0.0001), H-Index (r = 0.73, p = 0.001). The Middle East countries which spend more on R&D and which have a large number of universities and ISI indexed journals are likely to produce more significant volume of research papers in the field of environmental science.

  15. Integrated model for assessing the cost and CO2 emission (IMACC) for sustainable structural design in ready-mix concrete.

    PubMed

    Hong, Taehoon; Ji, Changyoon; Park, Hyoseon

    2012-07-30

    Cost has traditionally been considered the most important factor in the decision-making process. Recently, along with the consistent interest in environmental problems, environmental impact has also become a key factor. Accordingly, there is a need to develop a method that simultaneously reflects the cost and environmental impact in the decision-making process. This study proposed an integrated model for assessing the cost and CO(2) emission (IMACC) at the same time. IMACC is a model that assesses the cost and CO(2) emission of the various structural-design alternatives proposed in the structural-design process. To develop the IMACC, a standard on assessing the cost and CO(2) emission generated in the construction stage was proposed, along with the CO(2) emission factors in the structural materials, based on such materials' strengths. Moreover, using the economic and environmental scores that signify the cost and CO(2) emission reduction ratios, respectively, a method of selecting the best design alternative was proposed. To verify the applicability of IMACC, practical application was carried out. Structural designs were assessed, each of which used 21, 24, 27, and 30 MPa ready-mix concrete (RMC). The use of IMACC makes it easy to verify what the best design is. Results show the one that used 27 MPa RMC was the best design. Therefore, the proposed IMACC can be used as a tool for supporting the decision-making process in selecting the best design alternative. Copyright © 2012 Elsevier Ltd. All rights reserved.

  16. In silico models for predicting ready biodegradability under REACH: a comparative study.

    PubMed

    Pizzo, Fabiola; Lombardo, Anna; Manganaro, Alberto; Benfenati, Emilio

    2013-10-01

    REACH (Registration Evaluation Authorization and restriction of Chemicals) legislation is a new European law which aims to raise the human protection level and environmental health. Under REACH all chemicals manufactured or imported for more than one ton per year must be evaluated for their ready biodegradability. Ready biodegradability is also used as a screening test for persistent, bioaccumulative and toxic (PBT) substances. REACH encourages the use of non-testing methods such as QSAR (quantitative structure-activity relationship) models in order to save money and time and to reduce the number of animals used for scientific purposes. Some QSAR models are available for predicting ready biodegradability. We used a dataset of 722 compounds to test four models: VEGA, TOPKAT, BIOWIN 5 and 6 and START and compared their performance on the basis of the following parameters: accuracy, sensitivity, specificity and Matthew's correlation coefficient (MCC). Performance was analyzed from different points of view. The first calculation was done on the whole dataset and VEGA and TOPKAT gave the best accuracy (88% and 87% respectively). Then we considered the compounds inside and outside the training set: BIOWIN 6 and 5 gave the best results for accuracy (81%) outside training set. Another analysis examined the applicability domain (AD). VEGA had the highest value for compounds inside the AD for all the parameters taken into account. Finally, compounds outside the training set and in the AD of the models were considered to assess predictive ability. VEGA gave the best accuracy results (99%) for this group of chemicals. Generally, START model gave poor results. Since BIOWIN, TOPKAT and VEGA models performed well, they may be used to predict ready biodegradability. Copyright © 2013 Elsevier B.V. All rights reserved.

  17. Factors influencing nurses' readiness to care for hospitalised older people.

    PubMed

    Baumbusch, Jennifer; Leblanc, Marie-Eve; Shaw, Maureen; Kjorven, Mary

    2016-06-01

    To gain a better understanding of nurses' perspectives on factors that influence their readiness to provide appropriate care for hospitalised older people. Hospitals have consistently been criticised for failing to address the unique, complex needs of older people. Research suggests that multiple issues have led to this situation, including a lack of educational preparation for nurses, limited attention to environmental factors, and an absence of organisational preparedness that ensures hospitals are adapted to meet the needs of older people. An exploratory, qualitative approach was used. Forty-one Registered Nurses participated (24 point-of-care nurses; 17 organisational leaders). Six focus groups and one individual interview were conducted. Thematic data analysis was employed to generate the main study findings. An overarching theme of 'Poor Fit' emerged. While participants identified the shifting needs of patients towards more complex and relational care, the broader organisational and societal contexts were, largely, unchanging. This resulted in nurses recognising the factors needed to be ready to care for older patients and their families, but working in hospitals that were not suited to these needs. The findings identify factors at the point-of-care, the organisational level, and in broader societal attitudes that shape nurses' readiness to care for hospitalised older people. However, many of these factors are modifiable and care for older people could be improved through quality improvement initiatives and nursing leadership. This study offers insight into ways to re-imagine nursing care that can be responsive to older people's complex needs in hospitals. With a growing contingent of hospitalised older people, it is imperative that nurses, who comprise the largest workforce in this setting, be included in the planning and delivery of healthcare services to ensure readiness to meet the needs of this population. © 2015 John Wiley & Sons Ltd.

  18. ISO 14001 ENVIRONMENTAL MANAGEMENT SYSTEMS FOR GOVERNMENT

    EPA Science Inventory

    This presentation provides an overview of the document, ISO 14001 - A Tool for Supporting Government Environmental Programs and Policies, recently published by USEPA/s Office of Research and Development. It is an informational document, explaining the backjground and development ...

  19. Indicators of the environmental impacts of transportation : highway, rail, aviation, and maritime transport

    DOT National Transportation Integrated Search

    1996-10-01

    This document presents quantitative national estimates of the magnitude of transportations impacts on the natural environment. It is the most comprehensive compilation of environmental and transportation data to date. This document addresses all p...

  20. Public, environmental, and occupational health research activity in Arab countries: bibliometric, citation, and collaboration analysis.

    PubMed

    Sweileh, Waleed M; Zyoud, Sa'ed H; Al-Jabi, Samah W; Sawalha, Ansam F

    2015-01-01

    The objective of this study was to analyze quantity, assess quality, and investigate international collaboration in research from Arab countries in the field of public, environmental and occupational health. Original scientific articles and reviews published from the 22 Arab countries in the category "public, environmental & occupational health" during the study period (1900 - 2012) were screened using the ISI Web of Science database. The total number of original and review research articles published in the category of "public, environmental & occupational health" from Arab countries was 4673. Main area of research was tropical medicine (1862; 39.85%). Egypt with 1200 documents (25.86%) ranked first in quantity and ranked first in quality of publications (h-index = 51). The study identified 2036 (43.57%) documents with international collaboration. Arab countries actively collaborated with authors in Western Europe (22.91%) and North America (21.04%). Most of the documents (79.9%) were published in public health related journals while 21% of the documents were published in journals pertaining to prevention medicine, environmental, occupational health and epidemiology. Research in public, environmental and occupational health in Arab countries is in the rise. Public health research was dominant while environmental and occupation health research was relatively low. International collaboration was a good tool for increasing research quantity and quality.

Top