30 CFR 77.1707 - First aid equipment; location; minimum requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false First aid equipment; location; minimum... OF UNDERGROUND COAL MINES Miscellaneous § 77.1707 First aid equipment; location; minimum requirements. (a) Each operator of a surface coal mine shall maintain a supply of the first aid equipment set forth...
30 CFR 75.1713-7 - First-aid equipment; location; minimum requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false First-aid equipment; location; minimum... § 75.1713-7 First-aid equipment; location; minimum requirements. (a) Each operator of an underground coal mine shall maintain a supply of the first-aid equipment set forth in paragraph (b) of this § 75...
48 CFR 245.7206 - Transmitting DD Form 1342, DoD Property Record.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Instructions 245.7206 Transmitting DD Form 1342, DoD Property Record. As a minimum, the plant clearance officer... contractor acquired the equipment; (g) Location of the industrial plant equipment; (h) Total acquisition cost..., DoD Property Record. 245.7206 Section 245.7206 Federal Acquisition Regulations System DEFENSE...
49 CFR 238.230 - Safety appliances-new equipment.
Code of Federal Regulations, 2010 CFR
2010-10-01
... a minimum weld strength, based on yield, of three times the strength of the number of SAE grade 2, 1...; (v) The weld is designed for infinite fatigue life in the application that it will be placed; (vi... upon request. At a minimum, this record shall include the date, time, location, identification of the...
30 CFR 75.1713-7 - First-aid equipment; location; minimum requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... triangular bandages (15 if a splint-stretcher combination is used). (4) Eight 4-inch bandage compresses; (5) Eight 2-inch bandage compresses. (6) Twelve 1-inch adhesive compresses; (7) One foille; (8) Two cloth...
30 CFR 75.1713-7 - First-aid equipment; location; minimum requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... triangular bandages (15 if a splint-stretcher combination is used). (4) Eight 4-inch bandage compresses; (5) Eight 2-inch bandage compresses. (6) Twelve 1-inch adhesive compresses; (7) One foille; (8) Two cloth...
30 CFR 75.1713-7 - First-aid equipment; location; minimum requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... triangular bandages (15 if a splint-stretcher combination is used). (4) Eight 4-inch bandage compresses; (5) Eight 2-inch bandage compresses. (6) Twelve 1-inch adhesive compresses; (7) One foille; (8) Two cloth...
30 CFR 75.1713-7 - First-aid equipment; location; minimum requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... triangular bandages (15 if a splint-stretcher combination is used). (4) Eight 4-inch bandage compresses; (5) Eight 2-inch bandage compresses. (6) Twelve 1-inch adhesive compresses; (7) One foille; (8) Two cloth...
40 CFR 63.7741 - What are the installation, operation, and maintenance requirements for my monitors?
Code of Federal Regulations, 2010 CFR
2010-07-01
... paragraphs (a)(1)(i) through (iv) of this section. (i) Locate the flow sensor and other necessary equipment... sensor with a minimum measurement sensitivity of 2 percent of the flow rate. (iii) Conduct a flow sensor... paragraphs (a)(2)(i) through (vi) of this section. (i) Locate the pressure sensor(s) in or as close as...
40 CFR 63.7741 - What are the installation, operation, and maintenance requirements for my monitors?
Code of Federal Regulations, 2012 CFR
2012-07-01
... paragraphs (a)(1)(i) through (iv) of this section. (i) Locate the flow sensor and other necessary equipment... sensor with a minimum measurement sensitivity of 2 percent of the flow rate. (iii) Conduct a flow sensor... paragraphs (a)(2)(i) through (vi) of this section. (i) Locate the pressure sensor(s) in or as close as...
40 CFR 63.7741 - What are the installation, operation, and maintenance requirements for my monitors?
Code of Federal Regulations, 2014 CFR
2014-07-01
... paragraphs (a)(1)(i) through (iv) of this section. (i) Locate the flow sensor and other necessary equipment... sensor with a minimum measurement sensitivity of 2 percent of the flow rate. (iii) Conduct a flow sensor... paragraphs (a)(2)(i) through (vi) of this section. (i) Locate the pressure sensor(s) in or as close as...
30 CFR 77.1707 - First aid equipment; location; minimum requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... this paragraph (b) (2)); (3) Twenty-four triangular bandages (15 if a splint-stretcher combination is used); (4) Eight 4-inch bandage compresses; (5) Eight 2-inch bandage compresses; (6) Twelve 1-inch adhesive compresses; (7) An approved burn remedy; (8) Two cloth blankets; (9) One rubber blanket or...
30 CFR 77.1707 - First aid equipment; location; minimum requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... this paragraph (b) (2)); (3) Twenty-four triangular bandages (15 if a splint-stretcher combination is used); (4) Eight 4-inch bandage compresses; (5) Eight 2-inch bandage compresses; (6) Twelve 1-inch adhesive compresses; (7) An approved burn remedy; (8) Two cloth blankets; (9) One rubber blanket or...
30 CFR 77.1707 - First aid equipment; location; minimum requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... this paragraph (b) (2)); (3) Twenty-four triangular bandages (15 if a splint-stretcher combination is used); (4) Eight 4-inch bandage compresses; (5) Eight 2-inch bandage compresses; (6) Twelve 1-inch adhesive compresses; (7) An approved burn remedy; (8) Two cloth blankets; (9) One rubber blanket or...
30 CFR 77.1707 - First aid equipment; location; minimum requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... this paragraph (b) (2)); (3) Twenty-four triangular bandages (15 if a splint-stretcher combination is used); (4) Eight 4-inch bandage compresses; (5) Eight 2-inch bandage compresses; (6) Twelve 1-inch adhesive compresses; (7) An approved burn remedy; (8) Two cloth blankets; (9) One rubber blanket or...
ERIC Educational Resources Information Center
Finley, Deborah R.
1991-01-01
Describes a soil lab that can be performed with a minimum of equipment and time, utilizing a lawn, field, or woodlot. Students dig a 1-meter-deep pit and observe the litter and humus layers where most microbial and fungal decomposition occurs. Describes comparing different locations by pH level and concentration of potassium, phosphorous, and…
Influencial factors in thermographic analysis in substations
NASA Astrophysics Data System (ADS)
Zarco-Periñán, Pedro J.; Martínez-Ramos, José L.
2018-05-01
Thermography is one of the best predictive maintenance tools available due to its low cost, fast implementation and effectiveness of the results obtained. The detected hot spots enable serious incidents to be prevented, both in the facilities and equipment where they have been located. In accordance with the criticality of such points, the repair is carried out with greater or lesser urgency. However, for detection to remain reliable, the facility must meet a set of requirements that are normally assumed, otherwise hot spots cannot be detected correctly and will subsequently cause unwanted defects. This paper analyses three aspects that influence the reliability of the results obtained: the minimum percentage of load that a circuit must contain in order to be able to locate all the hot spots therein; the minimum waiting time from when an item of equipment or facility is energized until a thermographic inspection can be carried out with a complete guarantee of hot spot detection; and the influence on the generation of hot spots exerted by the tightening torque realized in the assembly process.
Physical Education, Secondary Schools Facilities and Basic Equipment 1966.
ERIC Educational Resources Information Center
Massachusetts School Building Assistance Commission, Boston.
Junior and senior high school gymnasiums should be located away from classrooms and near outdoor play areas. Junior high school gymnasiums should be a minimum of 84' x 98' x 22'. Senior high gymnasiums should be at least 90' x 106' x 24'. Areas should be divisible. Provision should be made for basketball, volleyball, badminton, paddle tennis,…
An Analysis of Electrical Consumption at Representative Army Installations.
1980-05-01
can be done by analyzing and optimizing HVAC system and building operation. For example, if the minimum hourly usage (demand) of a typical bachelor...equipment. (Major candidates for scheduling are air-handler motors, chillers , air compressors, exhaust fans, exterior lights, hot water heaters, and hot...location: Thermostats Setpoint Measured Limiters Setback Area Temperature Temperature Yes No Yes No Are night setback thermostats recommended? Yes _ No
Modified DHTT Equipment for Crystallization Studies of Mold Slags
NASA Astrophysics Data System (ADS)
Kölbl, Nathalie; Harmuth, Harald; Marschall, Irmtraud
2018-04-01
The double hot thermocouple technique (DHTT) enables simulations of the temperature gradient at near-service conditions during continuous casting of steel. With the equipment applied so far, a rectangular slag film of even thickness often cannot be achieved. Further, the minimum temperature frequently lies within the slag film. Modified equipment can avoid these disadvantages via the following design features. The entire furnace chamber is heated to the selected temperature of the cold wire, and the minimum temperature is not located within the slag film. Furthermore, the shape of the heating wire is improved, which enables mounting of a thin, rectangular slag film between four platinum wires. This modification allows for investigations on transparent and translucent slags. So far, the results from DHTT investigations were represented via snapshots of the samples at certain experimental times. Therefore, appropriate methods for the graphical representation of the results were suggested: the maximum crystallinity, the time related to certain crystallinities with a dependence on the position within the slag film, and the crystal growth rate. The CaO-MgO-Al2O3-SiO2 slag investigated with this equipment was mineralogically examined additionally, and based on thermodynamic calculations, the allocation of temperatures to certain positions within the crystallized slag film was possible.
38 CFR 17.155 - Minimum standards of safety and quality for automotive adaptive equipment.
Code of Federal Regulations, 2012 CFR
2012-07-01
... safety and quality for automotive adaptive equipment. 17.155 Section 17.155 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS MEDICAL Automotive Equipment and Driver Training § 17.155 Minimum standards of safety and quality for automotive adaptive equipment. (a) The Under Secretary for...
38 CFR 17.155 - Minimum standards of safety and quality for automotive adaptive equipment.
Code of Federal Regulations, 2014 CFR
2014-07-01
... safety and quality for automotive adaptive equipment. 17.155 Section 17.155 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS MEDICAL Automotive Equipment and Driver Training § 17.155 Minimum standards of safety and quality for automotive adaptive equipment. (a) The Under Secretary for...
38 CFR 17.155 - Minimum standards of safety and quality for automotive adaptive equipment.
Code of Federal Regulations, 2011 CFR
2011-07-01
... safety and quality for automotive adaptive equipment. 17.155 Section 17.155 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS MEDICAL Automotive Equipment and Driver Training § 17.155 Minimum standards of safety and quality for automotive adaptive equipment. (a) The Under Secretary for...
38 CFR 17.155 - Minimum standards of safety and quality for automotive adaptive equipment.
Code of Federal Regulations, 2013 CFR
2013-07-01
... safety and quality for automotive adaptive equipment. 17.155 Section 17.155 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS MEDICAL Automotive Equipment and Driver Training § 17.155 Minimum standards of safety and quality for automotive adaptive equipment. (a) The Under Secretary for...
NASA Astrophysics Data System (ADS)
Álvarez-Tey, G.; Jiménez-Castañeda, R.; Carpio, J.
2017-12-01
The infrared (IR) thermography is a non-destructive technique (NDT) which is used to carry out maintenance quickly and easily in photovoltaic (PV) systems. IR imaging with thermographic cameras under steady state conditions is a usual method for quality control of PV modules and plants in operation. For the proper IR inspection which determines the severity or the importance of the detected findings, it is necessary to consider different aspects of the configuration and the location of the thermographic equipment which allow reducing measuring errors. This paper considers some elements which contribute to the accurate configuration of the thermographic equipment. The influence of the reflected apparent temperature in outdoor IR inspections is analysed and it is proposed a simple method for obtaining it. Besides, the importance of the emissivity in IR thermography is analysed. For that, the value of the emissivity in PV modules of various types both front and rear shape is determined experimentally. It is also studied the proper location of the thermographic equipment in order to minimize reflections of the sun and the sky. For this objective, it is studied the ideal and minimum height of inspection according to the layout of the PV system. In a particular case, it is also analysed the influence of the horizontal angle of thermographic inspection and the reflected radiation.
NASA Technical Reports Server (NTRS)
Cardoso, Humberto Pontes
1990-01-01
The Satelite de Coleta de Dados (SCD) 02 (Data Collection Satellite) has the following characteristics: 115 kg weight, octagonal prism shape, 1 m diameter, and 0.67 m height. Its specified orbit is nearly circular, 700 km altitude, is inclined 25 deg with respect to the equator line, and has 100 min period. The electric power is supplied by eight solar panels installed on the lateral sides of the satellite. The equipment is located on the central (both faces) and lower (internal face) panels. The satellite is spin stabilized and its attitude control is such that during its lifetime, the solar aspect angle will vary between 80 and 100 deg with respect to its spin axis. Two critical cases were selected for thermal control design purposes: Hot case (maximum solar constant, solar aspect angle equal to 100 deg, minimum eclipse time and maximum internal heat dissipation); and a passive thermal design concept was achieved and the maximum and minimum equipment operating temperatures were obtained through a 109 node finite difference mathematical model.
42 CFR 52b.12 - What are the minimum requirements of construction and equipment?
Code of Federal Regulations, 2010 CFR
2010-10-01
... and equipment? 52b.12 Section 52b.12 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND... requirements of construction and equipment? (a) General. In addition to being subject to other laws... have been determined by the Director to constitute minimum requirements of construction and equipment...
Maintenance Assistance and Instruction Team (MAIT) Concept Review (Project LEAP, Issue 104).
1975-08-20
Reserve Component forces , to include identification of military and civilian authorized spaces, their associated equipment, salary, and travel costs...5) How many MAIT teams are authorized/assigned to each major command by installation (location)? (6) How many NIAIT are in support of Active Forces ... Forces , the USAR and the National Guard? (12) As a minimum, the following alternative courses of action should be considered: (a) Continue the MAIT
33 CFR 154.1130 - Requirements for prepositioned response equipment.
Code of Federal Regulations, 2012 CFR
2012-07-01
... Additional Response Plan Requirements for a Trans-Alaska Pipeline Authorization Act (TAPAA) Facility...: (a) On-water recovery equipment with a minimum effective daily recovery rate of 30,000 barrels... of a discharge. (c) On-water recovery equipment with a minimum effective daily recovery rate of 40...
33 CFR 154.1130 - Requirements for prepositioned response equipment.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Additional Response Plan Requirements for a Trans-Alaska Pipeline Authorization Act (TAPAA) Facility...: (a) On-water recovery equipment with a minimum effective daily recovery rate of 30,000 barrels... of a discharge. (c) On-water recovery equipment with a minimum effective daily recovery rate of 40...
33 CFR 154.1130 - Requirements for prepositioned response equipment.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Additional Response Plan Requirements for a Trans-Alaska Pipeline Authorization Act (TAPAA) Facility...: (a) On-water recovery equipment with a minimum effective daily recovery rate of 30,000 barrels... of a discharge. (c) On-water recovery equipment with a minimum effective daily recovery rate of 40...
33 CFR 154.1130 - Requirements for prepositioned response equipment.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Additional Response Plan Requirements for a Trans-Alaska Pipeline Authorization Act (TAPAA) Facility...: (a) On-water recovery equipment with a minimum effective daily recovery rate of 30,000 barrels... of a discharge. (c) On-water recovery equipment with a minimum effective daily recovery rate of 40...
Code of Federal Regulations, 2010 CFR
2010-07-01
... short circuit protection; minimum requirements. 77.506-1 Section 77.506-1 Mineral Resources MINE SAFETY...-1 Electric equipment and circuits; overload and short circuit protection; minimum requirements. Devices providing either short circuit protection or protection against overload shall conform to the...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Electric equipment and circuits; overload and short circuit protection; minimum requirements. 75.518-1 Section 75.518-1 Mineral Resources MINE SAFETY... short circuit protection; minimum requirements. A device to provide either short circuit protection or...
Zhou, L; Goodman, G; Martikainen, A
2013-01-01
Continuous airflow monitoring can improve the safety of the underground work force by ensuring the uninterrupted and controlled distribution of mine ventilation to all working areas. Air velocity measurements vary significantly and can change rapidly depending on the exact measurement location and, in particular, due to the presence of obstructions in the air stream. Air velocity must be measured at locations away from obstructions to avoid the vortices and eddies that can produce inaccurate readings. Further, an uninterrupted measurement path cannot always be guaranteed when using continuous airflow monitors due to the presence of nearby equipment, personnel, roof falls and rib rolls. Effective use of these devices requires selection of a minimum distance from an obstacle, such that an air velocity measurement can be made but not affected by the presence of that obstacle. This paper investigates the impacts of an obstruction on the behavior of downstream airflow using a numerical CFD model calibrated with experimental test results from underground testing. Factors including entry size, obstruction size and the inlet or incident velocity are examined for their effects on the distributions of airflow around an obstruction. A relationship is developed between the minimum measurement distance and the hydraulic diameters of the entry and the obstruction. A final analysis considers the impacts of continuous monitor location on the accuracy of velocity measurements and on the application of minimum measurement distance guidelines.
Zhou, L.; Goodman, G.; Martikainen, A.
2015-01-01
Continuous airflow monitoring can improve the safety of the underground work force by ensuring the uninterrupted and controlled distribution of mine ventilation to all working areas. Air velocity measurements vary significantly and can change rapidly depending on the exact measurement location and, in particular, due to the presence of obstructions in the air stream. Air velocity must be measured at locations away from obstructions to avoid the vortices and eddies that can produce inaccurate readings. Further, an uninterrupted measurement path cannot always be guaranteed when using continuous airflow monitors due to the presence of nearby equipment, personnel, roof falls and rib rolls. Effective use of these devices requires selection of a minimum distance from an obstacle, such that an air velocity measurement can be made but not affected by the presence of that obstacle. This paper investigates the impacts of an obstruction on the behavior of downstream airflow using a numerical CFD model calibrated with experimental test results from underground testing. Factors including entry size, obstruction size and the inlet or incident velocity are examined for their effects on the distributions of airflow around an obstruction. A relationship is developed between the minimum measurement distance and the hydraulic diameters of the entry and the obstruction. A final analysis considers the impacts of continuous monitor location on the accuracy of velocity measurements and on the application of minimum measurement distance guidelines. PMID:26388684
42 CFR 52b.12 - What are the minimum requirements of construction and equipment?
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 1 2011-10-01 2011-10-01 false What are the minimum requirements of construction and equipment? 52b.12 Section 52b.12 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS NATIONAL INSTITUTES OF HEALTH CONSTRUCTION GRANTS § 52b.12 What are the minimum...
Optimizing longwall mine layouts
DOE Office of Scientific and Technical Information (OSTI.GOV)
Minkel, M.J.
1996-12-31
Before spending the time to design an underground mine in detail, the mining engineer should be assured of the economic viability of the location of the layout. This has historically been a trial-and-error, iterative process. Traditional underground mine planning usually bases the layout on the geological characteristics of a deposit such as minimum seam height, quality, and the absence of faults. Whether one attempts to make a decision manually. or use traditional mine planning software, the process works something like this: First you build geological model. Then you impose a {open_quotes}best guess{close_quotes} as to which geological layers will become partmore » of the mined product, or will influence mining. Next you place your design where you believe is the best location to make a mine. Then you select equipment which you believe will cost-effectively mine the area. Finally, you schedule your equipment selection through the design over the mine life, run financial analyses and see if the rate of return is acceptable. If the NPV is acceptable, the design is accepted. If the NPV is not acceptable, the engineer has to restart the cycle of redesigning the layout, rescheduling the equipment, and restudying the economics again.« less
30 CFR 77.807-3 - Movement of equipment; minimum distance from high-voltage lines.
Code of Federal Regulations, 2010 CFR
2010-07-01
... high-voltage lines. 77.807-3 Section 77.807-3 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... WORK AREAS OF UNDERGROUND COAL MINES Surface High-Voltage Distribution § 77.807-3 Movement of equipment; minimum distance from high-voltage lines. When any part of any equipment operated on the surface of any...
Green technology as a strategy in managing the black spots in Siak Highway, Indonesia
NASA Astrophysics Data System (ADS)
Sandhyavitri, A.; Wira, J.; Martin, A.
2018-04-01
It was identified that the total traffic accidents in the highway section of Siak, Indonesia within the period of 2011 to 2015 were 1,208 events (2 accidents per 3 days). This accidents figure were considered relatively high and it need to mitigate. The aim of this research are to; (i) analyze the location of Black Spot in the Siak highway, and (ii) drawn a strategy reducing the traffic accidents based on green technology. This study identified that the black spot area was located in the STA 44 + 050 (with a value of the weighted index was 86 and an accident severity rate was 6.21), these values were relatively high. The road horizontal alignment condition at this location was highlighted as a sub-standard high way, consists of low visibility, numerous turning pads, minimum road signs, and minimum road shoulders width. The technical strategy was then drawn as follow; conducting regular road rehabilitation and maintenance, equipping road markings and the street lights as well as road safety facilities based on the green technology such as solar cell traffic lights, solar cell street lights and deploying police statues in reducing traffic accidents within the black spot areas.
30 CFR 18.97 - Inspection of machines; minimum requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT AND ACCESSORIES Field Approval of Electrically Operated Mining Equipment § 18.97 Inspection of machines; minimum... shall be conducted by an electrical representative and such inspection shall include: (1) Examination of...
30 CFR 18.97 - Inspection of machines; minimum requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT AND ACCESSORIES Field Approval of Electrically Operated Mining Equipment § 18.97 Inspection of machines; minimum... shall be conducted by an electrical representative and such inspection shall include: (1) Examination of...
14 CFR 121.335 - Equipment standards.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Equipment standards. (a) Reciprocating engine powered airplanes. The oxygen apparatus, the minimum rates of oxygen flow, and the supply of oxygen necessary to comply with § 121.327 must meet the standards...) Turbine engine powered airplanes. The oxygen apparatus, the minimum rate of oxygen flow, and the supply of...
14 CFR 121.335 - Equipment standards.
Code of Federal Regulations, 2013 CFR
2013-01-01
... Equipment standards. (a) Reciprocating engine powered airplanes. The oxygen apparatus, the minimum rates of oxygen flow, and the supply of oxygen necessary to comply with § 121.327 must meet the standards...) Turbine engine powered airplanes. The oxygen apparatus, the minimum rate of oxygen flow, and the supply of...
14 CFR 121.335 - Equipment standards.
Code of Federal Regulations, 2012 CFR
2012-01-01
... Equipment standards. (a) Reciprocating engine powered airplanes. The oxygen apparatus, the minimum rates of oxygen flow, and the supply of oxygen necessary to comply with § 121.327 must meet the standards...) Turbine engine powered airplanes. The oxygen apparatus, the minimum rate of oxygen flow, and the supply of...
14 CFR 121.335 - Equipment standards.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Equipment standards. (a) Reciprocating engine powered airplanes. The oxygen apparatus, the minimum rates of oxygen flow, and the supply of oxygen necessary to comply with § 121.327 must meet the standards...) Turbine engine powered airplanes. The oxygen apparatus, the minimum rate of oxygen flow, and the supply of...
14 CFR 121.335 - Equipment standards.
Code of Federal Regulations, 2014 CFR
2014-01-01
... Equipment standards. (a) Reciprocating engine powered airplanes. The oxygen apparatus, the minimum rates of oxygen flow, and the supply of oxygen necessary to comply with § 121.327 must meet the standards...) Turbine engine powered airplanes. The oxygen apparatus, the minimum rate of oxygen flow, and the supply of...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-03
... Committee 147, Minimum Operational Performance Standards for Traffic Alert and Collision Avoidance Systems... Traffic Alert and Collision Avoidance Systems Airborne Equipment. SUMMARY: The FAA is issuing this notice... Performance Standards for Traffic Alert and Collision Avoidance Systems Airborne Equipment. DATES: The meeting...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-05
... Committee 147, Minimum Operational Performance Standards for Traffic Alert and Collision Avoidance Systems... Traffic Alert and Collision Avoidance Systems Airborne Equipment. SUMMARY: The FAA is issuing this notice... Performance Standards for Traffic Alert and Collision Avoidance Systems Airborne Equipment. DATES: The meeting...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-30
... Committee 147, Minimum Operational Performance Standards for Traffic Alert and Collision Avoidance Systems... Traffic Alert and Collision Avoidance Systems Airborne Equipment. SUMMARY: The FAA is issuing this notice... Performance Standards for Traffic Alert and Collision Avoidance Systems Airborne Equipment. DATES: The meeting...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Electric equipment and circuits; overload and short circuit protection; minimum requirements. 75.518-1 Section 75.518-1 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Electrical...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Electric equipment and circuits; overload and short circuit protection; minimum requirements. 75.518-1 Section 75.518-1 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Electrical...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Electric equipment and circuits; overload and short circuit protection; minimum requirements. 75.518-1 Section 75.518-1 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Electrical...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Electric equipment and circuits; overload and short circuit protection; minimum requirements. 75.518-1 Section 75.518-1 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Electrical...
Lytle, R. Jeffrey; Lager, Darrel L.; Laine, Edwin F.; Davis, Donald T.
1979-01-01
Underground anomalies or discontinuities, such as holes, tunnels, and caverns, are located by lowering an electromagnetic signal transmitting antenna down one borehole and a receiving antenna down another, the ground to be surveyed for anomalies being situated between the boreholes. Electronic transmitting and receiving equipment associated with the antennas is activated and the antennas are lowered in unison at the same rate down their respective boreholes a plurality of times, each time with the receiving antenna at a different level with respect to the transmitting antenna. The transmitted electromagnetic waves diffract at each edge of an anomaly. This causes minimal signal reception at the receiving antenna. Triangulation of the straight lines between the antennas for the depths at which the signal minimums are detected precisely locates the anomaly. Alternatively, phase shifts of the transmitted waves may be detected to locate an anomaly, the phase shift being distinctive for the waves directed at the anomaly.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Electric equipment and circuits; overload and short circuit protection; minimum requirements. 77.506-1 Section 77.506-1 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS O...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Electric equipment and circuits; overload and short circuit protection; minimum requirements. 77.506-1 Section 77.506-1 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS O...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Electric equipment and circuits; overload and short circuit protection; minimum requirements. 77.506-1 Section 77.506-1 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS O...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Electric equipment and circuits; overload and short circuit protection; minimum requirements. 77.506-1 Section 77.506-1 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS O...
NASA Astrophysics Data System (ADS)
Halberg, Ephriam Etan
This study proposes that a Boeing X-37B space plane, its dimensions and performance characteristics estimated from publicly available documents, diagrams, and photographs, could be internally redesigned as a medical evacuation (ambulance) vehicle for the International Space Station. As of 2017, there is currently no spacecraft designed to accommodate a contingency medical evacuation wherein a crew member aboard the ISS is injured or ailing and must be returned to Earth for immediate medical attention. The X-37B is an unmanned vehicle with a history of success in both sub-orbital testing and all four of its long-duration orbital missions to date. Research conducted at UC Davis suggests that it is possible to retain the outer mold line of the X-37B while expanding the internal payload compartment to a volume sufficient for a crew of three--pilot, crew medical officer, and injured crew member--throughout ISS un-dock and atmospheric entry, descent, and landing. In addition to crew life support systems, this re-purposed X-37B, hereafter referred to as the X-37SA (Space Ambulance), includes medical equipment for stabilization of a patient in-transit. This study suggests an optimal, ergonomic crew configuration and berthing port location, procedures for microgravity ingress and 1G egress, a minimum medical equipment list and location within the crew cabin for the medical care and monitoring equipment. Conceptual crew configuration, ingress/egress procedures, and patient/equipment access are validated via physical simulation in a full-scale mockup of the proposed X-37SA crew cabin.
78 FR 59623 - Emergency Medical Equipment
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-27
.... FAA-2000-7119] RIN 2120-AG89 Emergency Medical Equipment AGENCY: Federal Aviation Administration (FAA... accordance with the FAA master minimum equipment list does not adversely affect aviation safety. This action... relief for use of emergency medical equipment. DATES: This action becomes effective September 27, 2013...
User Interaction with the CNPC Link
NASA Technical Reports Server (NTRS)
Hobbs, Alan; Lyall, Elizabeth A.
2014-01-01
As part of NASAs UAS in the NAS project, human factor guidelines are being developed for the ground control station of unmanned aircraft systems. A critical task for the pilot of a UAS is the management and control of the terrestrial radio links used to provide control of the vehicle and relay communications with air traffic control. An analysis of the task of the UAS pilot has been conducted to identify areas where guidelines are required. This analysis has identified a set of information requirements that must be supported by the radio equipment used to provide Control and Non-payload Communication (CNPC). Key requirements include the need for an alert when the link is lost, information on the current quality and latency of the link, and information to enable the future quality of the link to be anticipated as the aircraft changes location. These identified requirements can assist in the development of minimum operational performance standards for CNPC equipment.
75 FR 13210 - Proposed Information Collection (Service Data Manual) Activity: Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-18
... equipment and devices or mechanical equipment. DATES: Written comments and recommendations on the proposed... mechanical equipment are provided to VA. This clause sets forth those requirements and the minimum standards...
14 CFR 25.1443 - Minimum mass flow of supplemental oxygen.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Minimum mass flow of supplemental oxygen... § 25.1443 Minimum mass flow of supplemental oxygen. (a) If continuous flow equipment is installed for use by flight crewmembers, the minimum mass flow of supplemental oxygen required for each crewmember...
14 CFR 25.1443 - Minimum mass flow of supplemental oxygen.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Minimum mass flow of supplemental oxygen... § 25.1443 Minimum mass flow of supplemental oxygen. (a) If continuous flow equipment is installed for use by flight crewmembers, the minimum mass flow of supplemental oxygen required for each crewmember...
14 CFR 25.1443 - Minimum mass flow of supplemental oxygen.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Minimum mass flow of supplemental oxygen... § 25.1443 Minimum mass flow of supplemental oxygen. (a) If continuous flow equipment is installed for use by flight crewmembers, the minimum mass flow of supplemental oxygen required for each crewmember...
14 CFR 25.1443 - Minimum mass flow of supplemental oxygen.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Minimum mass flow of supplemental oxygen... § 25.1443 Minimum mass flow of supplemental oxygen. (a) If continuous flow equipment is installed for use by flight crewmembers, the minimum mass flow of supplemental oxygen required for each crewmember...
47 CFR 80.225 - Requirements for selective calling equipment.
Code of Federal Regulations, 2011 CFR
2011-10-01
... selective calling (DSC) equipment and selective calling equipment installed in ship and coast stations, and...-STD, “RTCM Recommended Minimum Standards for Digital Selective Calling (DSC) Equipment Providing... Class ‘D’ Digital Selective Calling (DSC)—Methods of testing and required test results,” March 2003. ITU...
25 CFR 547.16 - What are the minimum standards for game artwork, glass, and rules?
Code of Federal Regulations, 2011 CFR
2011-04-01
... 25 Indians 2 2011-04-01 2011-04-01 false What are the minimum standards for game artwork, glass... HUMAN SERVICES MINIMUM TECHNICAL STANDARDS FOR GAMING EQUIPMENT USED WITH THE PLAY OF CLASS II GAMES § 547.16 What are the minimum standards for game artwork, glass, and rules? This section provides...
25 CFR 547.16 - What are the minimum standards for game artwork, glass, and rules?
Code of Federal Regulations, 2012 CFR
2012-04-01
... 25 Indians 2 2012-04-01 2012-04-01 false What are the minimum standards for game artwork, glass... HUMAN SERVICES MINIMUM TECHNICAL STANDARDS FOR GAMING EQUIPMENT USED WITH THE PLAY OF CLASS II GAMES § 547.16 What are the minimum standards for game artwork, glass, and rules? This section provides...
25 CFR 547.16 - What are the minimum standards for game artwork, glass, and rules?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 2 2010-04-01 2010-04-01 false What are the minimum standards for game artwork, glass... HUMAN SERVICES MINIMUM TECHNICAL STANDARDS FOR GAMING EQUIPMENT USED WITH THE PLAY OF CLASS II GAMES § 547.16 What are the minimum standards for game artwork, glass, and rules? This section provides...
49 CFR 218.91 - Purpose and scope.
Code of Federal Regulations, 2012 CFR
2012-10-01
..., DEPARTMENT OF TRANSPORTATION RAILROAD OPERATING PRACTICES Handling Equipment, Switches, and Fixed Derails... can result from the mishandling of equipment, switches, and fixed derails. (b) This subpart prescribes minimum operating rule requirements for the handling of equipment, switches, and fixed derails. Each...
49 CFR 218.91 - Purpose and scope.
Code of Federal Regulations, 2013 CFR
2013-10-01
..., DEPARTMENT OF TRANSPORTATION RAILROAD OPERATING PRACTICES Handling Equipment, Switches, and Fixed Derails... can result from the mishandling of equipment, switches, and fixed derails. (b) This subpart prescribes minimum operating rule requirements for the handling of equipment, switches, and fixed derails. Each...
49 CFR 218.91 - Purpose and scope.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., DEPARTMENT OF TRANSPORTATION RAILROAD OPERATING PRACTICES Handling Equipment, Switches, and Fixed Derails... can result from the mishandling of equipment, switches, and fixed derails. (b) This subpart prescribes minimum operating rule requirements for the handling of equipment, switches, and fixed derails. Each...
49 CFR 218.91 - Purpose and scope.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., DEPARTMENT OF TRANSPORTATION RAILROAD OPERATING PRACTICES Handling Equipment, Switches, and Fixed Derails... can result from the mishandling of equipment, switches, and fixed derails. (b) This subpart prescribes minimum operating rule requirements for the handling of equipment, switches, and fixed derails. Each...
49 CFR 218.91 - Purpose and scope.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., DEPARTMENT OF TRANSPORTATION RAILROAD OPERATING PRACTICES Handling Equipment, Switches, and Fixed Derails... can result from the mishandling of equipment, switches, and fixed derails. (b) This subpart prescribes minimum operating rule requirements for the handling of equipment, switches, and fixed derails. Each...
42 CFR 84.197 - Respirator containers; minimum requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false Respirator containers; minimum requirements. 84.197... Cartridge Respirators § 84.197 Respirator containers; minimum requirements. Respirators shall be equipped with a substantial, durable container bearing markings which show the applicant's name, the type and...
42 CFR 84.173 - Harnesses; installation and construction; minimum requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false Harnesses; installation and construction; minimum... SERVICES OCCUPATIONAL SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE... construction; minimum requirements. (a) Each respirator shall, where necessary, be equipped with a suitable...
38 CFR 17.155 - Minimum standards of safety and quality for automotive adaptive equipment.
Code of Federal Regulations, 2010 CFR
2010-07-01
... justify development of formal standards, such equipment will be inspected and, if in order, approved for... safety and quality for automotive adaptive equipment. 17.155 Section 17.155 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS MEDICAL Automotive Equipment and Driver Training § 17.155...
47 CFR 15.213 - Cable locating equipment.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 1 2010-10-01 2010-10-01 false Cable locating equipment. 15.213 Section 15.213 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL RADIO FREQUENCY DEVICES Intentional Radiators § 15.213 Cable locating equipment. An intentional radiator used as cable locating equipment, as defined in § 15.3...
24 CFR 232.535 - Loan multiples-minimum principal.
Code of Federal Regulations, 2011 CFR
2011-04-01
... AUTHORITIES MORTGAGE INSURANCE FOR NURSING HOMES, INTERMEDIATE CARE FACILITIES, BOARD AND CARE HOMES, AND... of Fire Safety Equipment Eligible Security Instruments § 232.535 Loan multiples—minimum principal...
42 CFR 84.134 - Respirator containers; minimum requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false Respirator containers; minimum requirements. 84.134... Respirators § 84.134 Respirator containers; minimum requirements. Supplied-air respirators shall be equipped with a substantial, durable container bearing markings which show the applicant's name, the type and...
24 CFR 232.586 - Minimum principal loan amount.
Code of Federal Regulations, 2011 CFR
2011-04-01
... AUTHORITIES MORTGAGE INSURANCE FOR NURSING HOMES, INTERMEDIATE CARE FACILITIES, BOARD AND CARE HOMES, AND... of Fire Safety Equipment Eligible Security Instruments § 232.586 Minimum principal loan amount. A...
Code of Federal Regulations, 2014 CFR
2014-07-01
... Refrigerant Recycling Equipment Intended for Use With Both CFC-12 and HFC-134a E Appendix E to Subpart B of... Appendix E to Subpart B of Part 82—The Standard for Automotive Refrigerant Recycling Equipment Intended for... specific minimum equipment requirements for automotive refrigerant recycling equipment intended for use...
Code of Federal Regulations, 2012 CFR
2012-07-01
... Refrigerant Recycling Equipment Intended for Use With Both CFC-12 and HFC-134a E Appendix E to Subpart B of... Appendix E to Subpart B of Part 82—The Standard for Automotive Refrigerant Recycling Equipment Intended for... specific minimum equipment requirements for automotive refrigerant recycling equipment intended for use...
Code of Federal Regulations, 2013 CFR
2013-07-01
... Refrigerant Recycling Equipment Intended for Use With Both CFC-12 and HFC-134a E Appendix E to Subpart B of... Appendix E to Subpart B of Part 82—The Standard for Automotive Refrigerant Recycling Equipment Intended for... specific minimum equipment requirements for automotive refrigerant recycling equipment intended for use...
Code of Federal Regulations, 2011 CFR
2011-07-01
... Refrigerant Recycling Equipment Intended for Use With Both CFC-12 and HFC-134a E Appendix E to Subpart B of... Appendix E to Subpart B of Part 82—The Standard for Automotive Refrigerant Recycling Equipment Intended for... specific minimum equipment requirements for automotive refrigerant recycling equipment intended for use...
25 CFR 547.5 - What are the rules of interpretation and of general application for this part?
Code of Federal Regulations, 2010 CFR
2010-04-01
... INTERIOR HUMAN SERVICES MINIMUM TECHNICAL STANDARDS FOR GAMING EQUIPMENT USED WITH THE PLAY OF CLASS II... standards apply. Gaming equipment and software used with Class II gaming systems shall meet all applicable... of winning less than 1 in 50,000,000. (d) Approved equipment and software only. All gaming equipment...
49 CFR 232.603 - Design, interoperability, and configuration management requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... requirements. (a) General. A freight car or freight train equipped with an ECP brake system shall, at a minimum...) Approval. A freight train or freight car equipped with an ECP brake system and equipment covered by the AAR...) Configuration management. A railroad operating a freight train or freight car equipped with ECP brake systems...
49 CFR 232.603 - Design, interoperability, and configuration management requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... requirements. (a) General. A freight car or freight train equipped with an ECP brake system shall, at a minimum...) Approval. A freight train or freight car equipped with an ECP brake system and equipment covered by the AAR...) Configuration management. A railroad operating a freight train or freight car equipped with ECP brake systems...
49 CFR 232.603 - Design, interoperability, and configuration management requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... requirements. (a) General. A freight car or freight train equipped with an ECP brake system shall, at a minimum...) Approval. A freight train or freight car equipped with an ECP brake system and equipment covered by the AAR...) Configuration management. A railroad operating a freight train or freight car equipped with ECP brake systems...
49 CFR 232.603 - Design, interoperability, and configuration management requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... requirements. (a) General. A freight car or freight train equipped with an ECP brake system shall, at a minimum...) Approval. A freight train or freight car equipped with an ECP brake system and equipment covered by the AAR...) Configuration management. A railroad operating a freight train or freight car equipped with ECP brake systems...
Management of Electronic Test Equipment. Volume 4. DoD Policy.
1986-07-01
sources of supply , the PIL should not mandate sole source dependenc . but rather limit the variety to a minimum of two items. To clarify the controversy...equipment/ supplies on-hand, equipment readiness, and training. The resource area C-ratings are based on stated criteria. The criteria for equipment...respectively). The UNITREP leaves it up to the Military Services whether to include test equipment in the equipment/ supplies on-hand resource area. Although
30 CFR 75.1107-10 - High expansion foam devices; minimum capacity.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false High expansion foam devices; minimum capacity... foam devices; minimum capacity. (a) On unattended underground equipment the amount of water delivered as high expansion foam for a period of approximately 20 minutes shall be not less than 0.06 gallon...
30 CFR 75.1107-10 - High expansion foam devices; minimum capacity.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false High expansion foam devices; minimum capacity... foam devices; minimum capacity. (a) On unattended underground equipment the amount of water delivered as high expansion foam for a period of approximately 20 minutes shall be not less than 0.06 gallon...
14 CFR 23.1391 - Minimum intensities in the horizontal plane of position lights.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Minimum intensities in the horizontal plane of position lights. 23.1391 Section 23.1391 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... CATEGORY AIRPLANES Equipment Lights § 23.1391 Minimum intensities in the horizontal plane of position...
46 CFR 108.177 - Electrical equipment in classified locations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Electrical equipment in classified locations. 108.177 Section 108.177 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE... equipment in classified locations. Electrical equipment and devices installed in spaces made non-hazardous...
78 FR 37760 - Electrical Equipment in Hazardous Locations
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-24
... floating facilities engaged in OCS activities, however, equipment could be installed in hazardous locations... composition and the extent of equipment replacement. The myriad types of MODUs and facilities operating on the.... USCG-2012-0850] RIN 1625-AC00 Electrical Equipment in Hazardous Locations AGENCY: Coast Guard, DHS...
19 CFR 151.13 - Approval of commercial gaugers.
Code of Federal Regulations, 2010 CFR
2010-04-01
... gauger). In general, each technical staff member should have, at a minimum, six months training and..., manufacturer, and country-of-origin. (ii) Major equipment records. Records for each major piece of equipment...
14 CFR 91.213 - Inoperative instruments and equipment.
Code of Federal Regulations, 2012 CFR
2012-01-01
... airplane, glider, lighter-than-air aircraft, powered parachute, or weight-shift-control aircraft, for which... small airplane, glider, or lighter-than-air aircraft for which a Master Minimum Equipment List has been...
14 CFR 91.213 - Inoperative instruments and equipment.
Code of Federal Regulations, 2013 CFR
2013-01-01
... airplane, glider, lighter-than-air aircraft, powered parachute, or weight-shift-control aircraft, for which... small airplane, glider, or lighter-than-air aircraft for which a Master Minimum Equipment List has been...
14 CFR 91.213 - Inoperative instruments and equipment.
Code of Federal Regulations, 2011 CFR
2011-01-01
... airplane, glider, lighter-than-air aircraft, powered parachute, or weight-shift-control aircraft, for which... small airplane, glider, or lighter-than-air aircraft for which a Master Minimum Equipment List has been...
14 CFR 91.213 - Inoperative instruments and equipment.
Code of Federal Regulations, 2014 CFR
2014-01-01
... airplane, glider, lighter-than-air aircraft, powered parachute, or weight-shift-control aircraft, for which... small airplane, glider, or lighter-than-air aircraft for which a Master Minimum Equipment List has been...
14 CFR 91.213 - Inoperative instruments and equipment.
Code of Federal Regulations, 2010 CFR
2010-01-01
... airplane, glider, lighter-than-air aircraft, powered parachute, or weight-shift-control aircraft, for which... small airplane, glider, or lighter-than-air aircraft for which a Master Minimum Equipment List has been...
The provision of clearances accuracy in piston - cylinder mating
NASA Astrophysics Data System (ADS)
Glukhov, V. I.; Shalay, V. V.
2017-08-01
The paper is aimed at increasing the quality of the pumping equipment in oil and gas industry. The main purpose of the study is to stabilize maximum values of productivity and durability of the pumping equipment based on the selective assembly of the cylinder-piston kinematic mating by optimization criterion. It is shown that the minimum clearance in the piston-cylinder mating is formed by maximum material dimensions. It is proved that maximum material dimensions are characterized by their own laws of distribution within the tolerance limits for the diameters of the cylinder internal mirror and the outer cylindrical surface of the piston. At that, their dispersion zones should be divided into size groups with a group tolerance equal to half the tolerance for the minimum clearance. The techniques for measuring the material dimensions - the smallest cylinder diameter and the largest piston diameter according to the envelope condition - are developed for sorting them into size groups. Reliable control of the dimensions precision ensures optimal minimum clearances of the piston-cylinder mating in all the size groups of the pumping equipment, necessary for increasing the equipment productivity and durability during the production, operation and repair processes.
21 CFR 211.63 - Equipment design, size, and location.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 21 Food and Drugs 4 2014-04-01 2014-04-01 false Equipment design, size, and location. 211.63 Section 211.63 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES....63 Equipment design, size, and location. Equipment used in the manufacture, processing, packing, or...
21 CFR 211.63 - Equipment design, size, and location.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 21 Food and Drugs 4 2013-04-01 2013-04-01 false Equipment design, size, and location. 211.63 Section 211.63 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES....63 Equipment design, size, and location. Equipment used in the manufacture, processing, packing, or...
21 CFR 211.63 - Equipment design, size, and location.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 21 Food and Drugs 4 2010-04-01 2010-04-01 false Equipment design, size, and location. 211.63 Section 211.63 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES....63 Equipment design, size, and location. Equipment used in the manufacture, processing, packing, or...
21 CFR 211.63 - Equipment design, size, and location.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 21 Food and Drugs 4 2011-04-01 2011-04-01 false Equipment design, size, and location. 211.63 Section 211.63 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES....63 Equipment design, size, and location. Equipment used in the manufacture, processing, packing, or...
21 CFR 211.63 - Equipment design, size, and location.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 21 Food and Drugs 4 2012-04-01 2012-04-01 false Equipment design, size, and location. 211.63 Section 211.63 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES....63 Equipment design, size, and location. Equipment used in the manufacture, processing, packing, or...
Code of Federal Regulations, 2011 CFR
2011-07-01
...) A minimum of four Coast Guard approved ring life buoys, each equipped with 15 fathoms of line. (10... of 35 degrees north latitude in all other waters. (11) Two boat hooks. (12) A fire monitor with a...
Code of Federal Regulations, 2010 CFR
2010-07-01
...) A minimum of four Coast Guard approved ring life buoys, each equipped with 15 fathoms of line. (10... of 35 degrees north latitude in all other waters. (11) Two boat hooks. (12) A fire monitor with a...
Code of Federal Regulations, 2014 CFR
2014-07-01
...) A minimum of four Coast Guard approved ring life buoys, each equipped with 15 fathoms of line. (10... of 35 degrees north latitude in all other waters. (11) Two boat hooks. (12) A fire monitor with a...
Code of Federal Regulations, 2012 CFR
2012-07-01
...) A minimum of four Coast Guard approved ring life buoys, each equipped with 15 fathoms of line. (10... of 35 degrees north latitude in all other waters. (11) Two boat hooks. (12) A fire monitor with a...
Code of Federal Regulations, 2013 CFR
2013-07-01
...) A minimum of four Coast Guard approved ring life buoys, each equipped with 15 fathoms of line. (10... of 35 degrees north latitude in all other waters. (11) Two boat hooks. (12) A fire monitor with a...
14 CFR 25.1443 - Minimum mass flow of supplemental oxygen.
Code of Federal Regulations, 2010 CFR
2010-01-01
...,100 cc. with a constant time interval between respirations. (d) If first-aid oxygen equipment is... minute per person for whom first-aid oxygen is required. (e) If portable oxygen equipment is installed...
25 CFR 547.13 - What are the minimum technical standards for program storage media?
Code of Federal Regulations, 2011 CFR
2011-04-01
... 25 Indians 2 2011-04-01 2011-04-01 false What are the minimum technical standards for program storage media? 547.13 Section 547.13 Indians NATIONAL INDIAN GAMING COMMISSION, DEPARTMENT OF THE INTERIOR HUMAN SERVICES MINIMUM TECHNICAL STANDARDS FOR GAMING EQUIPMENT USED WITH THE PLAY OF CLASS II GAMES...
25 CFR 547.13 - What are the minimum technical standards for program storage media?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 2 2010-04-01 2010-04-01 false What are the minimum technical standards for program storage media? 547.13 Section 547.13 Indians NATIONAL INDIAN GAMING COMMISSION, DEPARTMENT OF THE INTERIOR HUMAN SERVICES MINIMUM TECHNICAL STANDARDS FOR GAMING EQUIPMENT USED WITH THE PLAY OF CLASS II GAMES...
25 CFR 547.13 - What are the minimum technical standards for program storage media?
Code of Federal Regulations, 2012 CFR
2012-04-01
... 25 Indians 2 2012-04-01 2012-04-01 false What are the minimum technical standards for program storage media? 547.13 Section 547.13 Indians NATIONAL INDIAN GAMING COMMISSION, DEPARTMENT OF THE INTERIOR HUMAN SERVICES MINIMUM TECHNICAL STANDARDS FOR GAMING EQUIPMENT USED WITH THE PLAY OF CLASS II GAMES...
Code of Federal Regulations, 2010 CFR
2010-04-01
... and enabling Class II gaming system components? 547.6 Section 547.6 Indians NATIONAL INDIAN GAMING COMMISSION, DEPARTMENT OF THE INTERIOR HUMAN SERVICES MINIMUM TECHNICAL STANDARDS FOR GAMING EQUIPMENT USED WITH THE PLAY OF CLASS II GAMES § 547.6 What are the minimum technical standards for enrolling and...
14 CFR 29.1391 - Minimum intensities in the horizontal plane of forward and rear position lights.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Minimum intensities in the horizontal plane of forward and rear position lights. 29.1391 Section 29.1391 Aeronautics and Space FEDERAL AVIATION... Equipment Lights § 29.1391 Minimum intensities in the horizontal plane of forward and rear position lights...
14 CFR 25.1391 - Minimum intensities in the horizontal plane of forward and rear position lights.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Minimum intensities in the horizontal plane of forward and rear position lights. 25.1391 Section 25.1391 Aeronautics and Space FEDERAL AVIATION... Equipment Lights § 25.1391 Minimum intensities in the horizontal plane of forward and rear position lights...
14 CFR 27.1391 - Minimum intensities in the horizontal plane of forward and rear position lights.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Minimum intensities in the horizontal plane of forward and rear position lights. 27.1391 Section 27.1391 Aeronautics and Space FEDERAL AVIATION... Equipment Lights § 27.1391 Minimum intensities in the horizontal plane of forward and rear position lights...
14 CFR 27.1393 - Minimum intensities in any vertical plane of forward and rear position lights.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Minimum intensities in any vertical plane of forward and rear position lights. 27.1393 Section 27.1393 Aeronautics and Space FEDERAL AVIATION... Equipment Lights § 27.1393 Minimum intensities in any vertical plane of forward and rear position lights...
14 CFR 29.1393 - Minimum intensities in any vertical plane of forward and rear position lights.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Minimum intensities in any vertical plane of forward and rear position lights. 29.1393 Section 29.1393 Aeronautics and Space FEDERAL AVIATION... Equipment Lights § 29.1393 Minimum intensities in any vertical plane of forward and rear position lights...
14 CFR 25.1393 - Minimum intensities in any vertical plane of forward and rear position lights.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Minimum intensities in any vertical plane of forward and rear position lights. 25.1393 Section 25.1393 Aeronautics and Space FEDERAL AVIATION... Equipment Lights § 25.1393 Minimum intensities in any vertical plane of forward and rear position lights...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-28
... for Locating People Using Electricity Dependent Medical Equipment During Public Health Emergencies... submissions to the ``System for Locating People Using Electricity Dependent Medical Equipment During Public....m. The ``System for Locating People Using Electricity Dependent Medical Equipment During Public...
141. ARAIII Equipment location plan. Includes list of equipment and ...
141. ARA-III Equipment location plan. Includes list of equipment and location in reactor, control, and other buildings. Aerojet-general 880-area/GCRE-101-U-1. Date: February 1958. Ineel index code no. 063-0101-65-013-192508. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID
Reißhauer, A; Liebl, M E
2012-07-01
Standards for what should be available in terms of equipment and services in a department of physical medicine caring for acute inpatients do not exist in Germany. The profile of a department determines the therapeutic services it focuses on and hence the technical facilities required. The German catalogue of operations and procedures defines minimum thresholds for treatment. In the opinion of the authors a department caring for inpatients with acute rheumatic diseases must, as a minimum, have the facilities and equipment necessary for offering thermotherapeutic treatment. Staff trained in physical therapeutic procedures and occupational therapy is also crucial. Moreover, it is desirable that the staff should be trained in manual therapy.
2017-01-01
The residential sector comprises equipment consuming various fuels and providing different end-use services. When replacing equipment, consumers may choose to purchase equipment that meets minimum federal equipment efficiency standards, or they may opt for higher-efficiency equipment, such as equipment that meets or exceeds ENERGY STAR® specifications. Consumers may also choose to purchase or retrofit different types of equipment, which may require additional costs (e.g., for ducts, exhaust vents, natural gas lines, or electrical connections) to install. The stock mix of equipment types, efficiency levels, and fuels consumed directly affects total residential sector energy consumption.
Simplified Approach Charts Improve Data Retrieval Performance
Stewart, Michael; Laraway, Sean; Jordan, Kevin; Feary, Michael S.
2016-01-01
The effectiveness of different instrument approach charts to deliver minimum visibility and altitude information during airport equipment outages was investigated. Eighteen pilots flew simulated instrument approaches in three conditions: (a) normal operations using a standard approach chart (standard-normal), (b) equipment outage conditions using a standard approach chart (standard-outage), and (c) equipment outage conditions using a prototype decluttered approach chart (prototype-outage). Errors and retrieval times in identifying minimum altitudes and visibilities were measured. The standard-outage condition produced significantly more errors and longer retrieval times versus the standard-normal condition. The prototype-outage condition had significantly fewer errors and shorter retrieval times than did the standard-outage condition. The prototype-outage condition produced significantly fewer errors but similar retrieval times when compared with the standard-normal condition. Thus, changing the presentation of minima may reduce risk and increase safety in instrument approaches, specifically with airport equipment outages. PMID:28491009
NASA Astrophysics Data System (ADS)
Delmelle, Eric M.; Thill, Jean-Claude; Peeters, Dominique; Thomas, Isabelle
2014-07-01
In rapidly growing urban areas, it is deemed vital to expand (or contract) an existing network of public facilities to meet anticipated changes in the level of demand. We present a multi-period capacitated median model for school network facility location planning that minimizes transportation costs, while functional costs are subject to a budget constraint. The proposed Vintage Flexible Capacitated Location Problem (ViFCLP) has the flexibility to account for a minimum school-age closing requirement, while the maximum capacity of each school can be adjusted by the addition of modular units. Non-closest assignments are controlled by the introduction of a parameter penalizing excess travel. The applicability of the ViFCLP is illustrated on a large US school system (Charlotte-Mecklenburg, North Carolina) where high school demand is expected to grow faster with distance to the city center. Higher school capacities and greater penalty on travel impedance parameter reduce the number of non-closest assignments. The proposed model is beneficial to policy makers seeking to improve the provision and efficiency of public services over a multi-period planning horizon.
14 CFR 23.1443 - Minimum mass flow of supplemental oxygen.
Code of Federal Regulations, 2010 CFR
2010-01-01
... discretion. (c) If first-aid oxygen equipment is installed, the minimum mass flow of oxygen to each user may... upon an average flow rate of 3 liters per minute per person for whom first-aid oxygen is required. (d...
DOT National Transportation Integrated Search
2001-01-01
This technical standard order (TSO) prescribes the minimum performance standard that airborne supplemental area navigation equipment using the global positioning system (GPS) must meet in order to be identified with the applicable TSO marking. Airbor...
Code of Federal Regulations, 2010 CFR
2010-07-01
...-TRANSPORTATION AND TEMPORARY STORAGE OF HOUSEHOLD GOODS AND PROFESSIONAL BOOKS, PAPERS, AND EQUIPMENT (PBP&E... calculated when a carrier charges a minimum weight, but the actual weight of HHG, PBP&E and temporary storage... actual weight of HHG, PBP&E and temporary storage is less than the minimum weight charged? Charges for...
29 CFR 1926.1408 - Power line safety (up to 350 kV)-equipment operations.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 29 Labor 8 2013-07-01 2013-07-01 false Power line safety (up to 350 kV)-equipment operations. 1926... Derricks in Construction § 1926.1408 Power line safety (up to 350 kV)—equipment operations. (a) Hazard... for use and conditions of use. Table A—Minimum Clearance Distances Voltage(nominal, kV, alternating...
29 CFR 1926.1408 - Power line safety (up to 350 kV)-equipment operations.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 29 Labor 8 2012-07-01 2012-07-01 false Power line safety (up to 350 kV)-equipment operations. 1926... Derricks in Construction § 1926.1408 Power line safety (up to 350 kV)—equipment operations. (a) Hazard... for use and conditions of use. Table A—Minimum Clearance Distances Voltage(nominal, kV, alternating...
29 CFR 1926.1408 - Power line safety (up to 350 kV)-equipment operations.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 29 Labor 8 2014-07-01 2014-07-01 false Power line safety (up to 350 kV)-equipment operations. 1926... Derricks in Construction § 1926.1408 Power line safety (up to 350 kV)—equipment operations. (a) Hazard... for use and conditions of use. Table A—Minimum Clearance Distances Voltage(nominal, kV, alternating...
29 CFR 1926.1408 - Power line safety (up to 350 kV)-equipment operations.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 29 Labor 8 2011-07-01 2011-07-01 false Power line safety (up to 350 kV)-equipment operations. 1926... Derricks in Construction § 1926.1408 Power line safety (up to 350 kV)—equipment operations. (a) Hazard... for use and conditions of use. Table A—Minimum Clearance Distances Voltage(nominal, kV, alternating...
Engineering aspects of a thermal control subsystem for the 25 kW power module
NASA Technical Reports Server (NTRS)
Schroeder, P. E.
1979-01-01
The paper presents the key trade study results, analysis results, and the recommended thermal control approach for the 25 kW power module defined by NASA. Power conversion inefficiencies and component heat dissipation results in a minimum heat rejection requirement of 9 kW to maintain the power module equipment at desired temperature levels. Additionally, some cooling capacity should be provided for user payloads in the sortie and free-flying modes. The baseline thermal control subsystem includes a dual-loop-pumped Freon-21 coolant with the heat rejected from deployable existing orbiter radiators. Thermal analysis included an assessment of spacecraft orientations, radiator shapes and locations, and comparison of hybrid heat pipe and all liquid panels.
Impact of survey workflow on precision and accuracy of terrestrial LiDAR datasets
NASA Astrophysics Data System (ADS)
Gold, P. O.; Cowgill, E.; Kreylos, O.
2009-12-01
Ground-based LiDAR (Light Detection and Ranging) survey techniques are enabling remote visualization and quantitative analysis of geologic features at unprecedented levels of detail. For example, digital terrain models computed from LiDAR data have been used to measure displaced landforms along active faults and to quantify fault-surface roughness. But how accurately do terrestrial LiDAR data represent the true ground surface, and in particular, how internally consistent and precise are the mosaiced LiDAR datasets from which surface models are constructed? Addressing this question is essential for designing survey workflows that capture the necessary level of accuracy for a given project while minimizing survey time and equipment, which is essential for effective surveying of remote sites. To address this problem, we seek to define a metric that quantifies how scan registration error changes as a function of survey workflow. Specifically, we are using a Trimble GX3D laser scanner to conduct a series of experimental surveys to quantify how common variables in field workflows impact the precision of scan registration. Primary variables we are testing include 1) use of an independently measured network of control points to locate scanner and target positions, 2) the number of known-point locations used to place the scanner and point clouds in 3-D space, 3) the type of target used to measure distances between the scanner and the known points, and 4) setting up the scanner over a known point as opposed to resectioning of known points. Precision of the registered point cloud is quantified using Trimble Realworks software by automatic calculation of registration errors (errors between locations of the same known points in different scans). Accuracy of the registered cloud (i.e., its ground-truth) will be measured in subsequent experiments. To obtain an independent measure of scan-registration errors and to better visualize the effects of these errors on a registered point cloud, we scan from multiple locations an object of known geometry (a cylinder mounted above a square box). Preliminary results show that even in a controlled experimental scan of an object of known dimensions, there is significant variability in the precision of the registered point cloud. For example, when 3 scans of the central object are registered using 4 known points (maximum time, maximum equipment), the point clouds align to within ~1 cm (normal to the object surface). However, when the same point clouds are registered with only 1 known point (minimum time, minimum equipment), misalignment of the point clouds can range from 2.5 to 5 cm, depending on target type. The greater misalignment of the 3 point clouds when registered with fewer known points stems from the field method employed in acquiring the dataset and demonstrates the impact of field workflow on LiDAR dataset precision. By quantifying the degree of scan mismatch in results such as this, we can provide users with the information needed to maximize efficiency in remote field surveys.
40 CFR 265.1090 - Recordkeeping requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... applicable to the facility. Except for air emission control equipment design documentation and information... the operating record for a minimum of 3 years. Air emission control equipment design documentation... explain: How use of the required air emission controls on the tanks would affect the tank design features...
40 CFR 264.1089 - Recordkeeping requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... facility. Except for air emission control equipment design documentation and information required by... record for a minimum of 3 years. Air emission control equipment design documentation shall be maintained... the owner or operator stating that the control device is designed to operate at the performance level...
40 CFR 265.1090 - Recordkeeping requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... applicable to the facility. Except for air emission control equipment design documentation and information... the operating record for a minimum of 3 years. Air emission control equipment design documentation... explain: How use of the required air emission controls on the tanks would affect the tank design features...
40 CFR 264.1089 - Recordkeeping requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... facility. Except for air emission control equipment design documentation and information required by... record for a minimum of 3 years. Air emission control equipment design documentation shall be maintained... the owner or operator stating that the control device is designed to operate at the performance level...
40 CFR 264.1089 - Recordkeeping requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... facility. Except for air emission control equipment design documentation and information required by... record for a minimum of 3 years. Air emission control equipment design documentation shall be maintained... the owner or operator stating that the control device is designed to operate at the performance level...
40 CFR 265.1090 - Recordkeeping requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... applicable to the facility. Except for air emission control equipment design documentation and information... the operating record for a minimum of 3 years. Air emission control equipment design documentation... explain: How use of the required air emission controls on the tanks would affect the tank design features...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Whiteside, R.; Pawlowicz, R.; Whitehead, L.
2002-02-25
In 2000, Bechtel Jacobs Company LLC (BJC) contracted Tetra Tech NUS, Inc. (TtNUS) and their sub-contractor, Texas World Operations, Inc. (TWO), to plug and abandon (P&A) 111 wells located in the Melton Valley area of Oak Ridge National Laboratory (ORNL). One hundred and seven of those wells were used to monitor fluid movement and subsurface containment of the low level radioactive liquid waste/grout slurry that was injected into the Pumpkin Valley Shale Formation, underlying ORNL. Four wells were used as hydrofracture injection wells to emplace the waste in the shale formation. Although the practice of hydrofracturing was and is consideredmore » by many to pose no threat to human health or the environment, the practice was halted in 1982 after the Federal Underground Injection Control regulations were enacted by United States Environmental Protection Agency (USEPA) making it necessary to properly close the wells. The work is being performed for the United States Department of Energy Oak Ridge Operations (DOE ORO). The project team is using the philosophy of minimum waste generation and the principles of ALARA (As Low As Reasonably Achievable) as key project goals to minimize personnel and equipment exposure, waste generation, and project costs. Achievement of these goals was demonstrated by the introduction of several new pieces of custom designed well plugging and abandonment equipment that were tested and used effectively during field operations. Highlights of the work performed and the equipment used are presented.« less
49 CFR 393.11 - Lamps and reflective devices.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., reflective devices and associated equipment by the type of commercial motor vehicle. The diagrams in this... Table 1. All commercial motor vehicles manufactured on or after December 25, 1968, must, at a minimum... of the vehicle. Commercial motor vehicles manufactured before December 25, 1968, must, at a minimum...
Code of Federal Regulations, 2013 CFR
2013-04-01
... data communications between system components? 547.15 Section 547.15 Indians NATIONAL INDIAN GAMING... AND EQUIPMENT § 547.15 What are the minimum technical standards for electronic data communications between system components? (a) Sensitive data. Communication of sensitive data must be secure from...
Code of Federal Regulations, 2014 CFR
2014-04-01
... data communications between system components? 547.15 Section 547.15 Indians NATIONAL INDIAN GAMING... AND EQUIPMENT § 547.15 What are the minimum technical standards for electronic data communications between system components? (a) Sensitive data. Communication of sensitive data must be secure from...
Evaluation of the effectiveness of peracetic acid in the sterilization of dental equipment.
Ceretta, R; Paula, M M S; Angioletto, Ev; Méier, M M; Mitellstädt, F G; Pich, C T; Junior, S A; Angioletto, E
2008-01-01
To evaluate the effectiveness of peracetic acid in the microbiological sterilisation of dental materials. Peracetic acid solution was evaluated at concentrations of 800, 1500 and 2500 ppm. At these concentrations, it was determined whether peracetic acid caused corrosion to dental instruments and induced cellular mutagenicity and cytotoxicity. In addition, the minimum inhibitory concentration (MIC), the minimum bactericidal concentration (MBC), agar diffusion and diffusion by well method, were also verified. The corrosion rate, calculated from potentiodynamic assays was 10(-6) cm/year, indicating that the product does not damage equipment. The sterilisation capacity of peracetic acid at 2500 ppm was the best. The comet assay indicated genotoxic activity at 2500 ppm. This study demonstrated the effectiveness of peracetic acid for sterilizing dental equipment, providing another alternative for the prevention of infections in clinics.
[Experience of importation of equipment for research in the ELSA-Brasil].
Almeida, Cristiana Paula Matos de; Aquino, Estela M L; Mota, Eduardo L A; Mota, Fábio Batista; Braga, Valéria Cerqueira Campos; Ladeira, Roberto Marini; Silva, Gabriela Feiden; Souza, Angelita Gomes de; Oliveira, Rosalba
2013-06-01
Policies that promote research in health were established in the last decade, developing the Brazilian scientific production. This development has not been accompanied by an improvement in the legal-institutional framework, thus hindering the development of research projects, including equipment importation activities. The present study aimed to analyze the equipment importation process for the Brazilian Longitudinal Study for Adult Health (ELSA-Brasil). A case study was performed with data collected from internal ELSA-Brasil documents in five Investigation Centers and their respective supporting foundations. The following importation documents were analyzed: pulse wave velocity, bioimaging and retinography. Additionally, non-structured interviews with researchers and key informers were conducted in the foundations. Data were treated and organized into three stages: administrative-operational, exchange rate, and fiscal. Lengths of duration of these stages were calculated comparatively among centers. The need to standardize equipment in a multicenter study required a joint action of implementing institutions and foundations. Of all pieces of equipment analyzed, the first stage was administrative-operational, with a varying duration (minimum of eight, maximum of 101, and mean of 55 days) which was longer when legal opinions were included. The second stage was the exchange rate, which was longer than the former and did not pose any obstacles to the process (minimum of 11, maximum of 381, and mean of 196 days). The third stage was fiscal, which was the longest one (minimum of 43, maximum of 388, and mean of 215.5 days), due to the release of equipment without registration into the country. There were other factors that posed obstacles: inexperience of investigation centers and institutions in networking; inadequacy of the national legislation on scientific research particularities; and the lack of specialized professionals in scientific project management. The results show the slowness of the equipment importation process in Brazil, especially due to legal, bureaucratic and managerial obstacles.
10 CFR 429.44 - Commercial water heating equipment.
Code of Federal Regulations, 2013 CFR
2013-01-01
... of minimum thermal efficiency or other measure of energy consumption of a basic model for which... 10 Energy 3 2013-01-01 2013-01-01 false Commercial water heating equipment. 429.44 Section 429.44 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION CERTIFICATION, COMPLIANCE, AND ENFORCEMENT FOR CONSUMER...
28 CFR 545.24 - Inmate work conditions.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 545.24 Judicial Administration BUREAU OF PRISONS, DEPARTMENT OF JUSTICE INSTITUTIONAL MANAGEMENT WORK... appropriate minimum standards for health and safety. Safety equipment is to be available where needed. (e) An inmate is expected to perform the work assignment in a safe manner, using safety equipment as instructed...
30 CFR 250.615 - Blowout prevention equipment.
Code of Federal Regulations, 2010 CFR
2010-07-01
... be applied during each mode of pressure control. (b) The minimum BOP system for well-workover operations with the tree removed must meet the appropriate standards from the following table: When The... for well-workover operations with the tree removed must be equipped with the following: (1) A...
47 CFR 15.213 - Cable locating equipment.
Code of Federal Regulations, 2012 CFR
2012-10-01
...: Within the frequency band 9 kHz, up to, but not including, 45 kHz, the peak output power from the cable... output power from the cable locating equipment shall not exceed one watt. If provisions are made for connection of the cable locating equipment to the AC power lines, the conducted limits in § 15.207 also apply...
47 CFR 15.213 - Cable locating equipment.
Code of Federal Regulations, 2013 CFR
2013-10-01
...: Within the frequency band 9 kHz, up to, but not including, 45 kHz, the peak output power from the cable... output power from the cable locating equipment shall not exceed one watt. If provisions are made for connection of the cable locating equipment to the AC power lines, the conducted limits in § 15.207 also apply...
47 CFR 15.213 - Cable locating equipment.
Code of Federal Regulations, 2014 CFR
2014-10-01
...: Within the frequency band 9 kHz, up to, but not including, 45 kHz, the peak output power from the cable... output power from the cable locating equipment shall not exceed one watt. If provisions are made for connection of the cable locating equipment to the AC power lines, the conducted limits in § 15.207 also apply...
47 CFR 15.213 - Cable locating equipment.
Code of Federal Regulations, 2011 CFR
2011-10-01
...: Within the frequency band 9 kHz, up to, but not including, 45 kHz, the peak output power from the cable... output power from the cable locating equipment shall not exceed one watt. If provisions are made for connection of the cable locating equipment to the AC power lines, the conducted limits in § 15.207 also apply...
46 CFR 108.421 - Location of fire pumps and associated equipment.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Location of fire pumps and associated equipment. 108.421... pumps and associated equipment. Each fire pump required by § 108.415, and the source of power, controls, sea connections for the fire pump, and booster pumps, if installed, must be installed in locations...
14 CFR 23.1393 - Minimum intensities in any vertical plane of position lights.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Minimum intensities in any vertical plane... CATEGORY AIRPLANES Equipment Lights § 23.1393 Minimum intensities in any vertical plane of position lights... above or below the horizontal plane Intensity, l 0° 1.00 0° to 5° 0.90 5° to 10° 0.80 10° to 15° 0.70 15...
14 CFR 29.1393 - Minimum intensities in any vertical plane of forward and rear position lights.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Minimum intensities in any vertical plane... Equipment Lights § 29.1393 Minimum intensities in any vertical plane of forward and rear position lights... above or below the horizontal plane Intensity, I 0° 1.00 0° to 5° .90 5° to 10° .80 10° to 15° .70 15...
Terrain, weather pose challenges in Minnesota project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Trojack, L.
1994-12-01
This paper briefly reviews an innovative method used in installing a natural gas pipeline in Minnesota which traversed a marsh area. Because of the special problems associated with this wetland area, special equipment and techniques had to be used to minimize disturbance associated with the construction. It describes the equipment and the resulting performance the equipment had. It proved to significantly reduce disturbance and result in minimum site restoration work.
40 CFR 170.240 - Personal protective equipment.
Code of Federal Regulations, 2010 CFR
2010-07-01
... protective equipment (PPE) means devices and apparel that are worn to protect the body from contact with... chemical-resistant garment that covers, at a minimum, the entire body except head, hands, and feet. (4... body except head, hands, and feet. The pesticide product labeling may specify that the coveralls be...
30 CFR 49.16 - Equipment and maintenance requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... TRAINING MINE RESCUE TEAMS Mine Rescue Teams for Underground Coal Mines § 49.16 Equipment and maintenance... team members. (1) Twelve self-contained breathing apparatus, each with a minimum of 4 hours capacity... apparatus and sufficient to sustain each team for 8 hours while using the breathing apparatus during rescue...
30 CFR 49.16 - Equipment and maintenance requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... TRAINING MINE RESCUE TEAMS Mine Rescue Teams for Underground Coal Mines § 49.16 Equipment and maintenance... team members. (1) Twelve self-contained breathing apparatus, each with a minimum of 4 hours capacity... apparatus and sufficient to sustain each team for 8 hours while using the breathing apparatus during rescue...
30 CFR 49.16 - Equipment and maintenance requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... TRAINING MINE RESCUE TEAMS Mine Rescue Teams for Underground Coal Mines § 49.16 Equipment and maintenance... team members. (1) Twelve self-contained breathing apparatus, each with a minimum of 4 hours capacity... apparatus and sufficient to sustain each team for 8 hours while using the breathing apparatus during rescue...
30 CFR 49.16 - Equipment and maintenance requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... TRAINING MINE RESCUE TEAMS Mine Rescue Teams for Underground Coal Mines § 49.16 Equipment and maintenance... team members. (1) Twelve self-contained breathing apparatus, each with a minimum of 4 hours capacity... apparatus and sufficient to sustain each team for 8 hours while using the breathing apparatus during rescue...
30 CFR 49.16 - Equipment and maintenance requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... TRAINING MINE RESCUE TEAMS Mine Rescue Teams for Underground Coal Mines § 49.16 Equipment and maintenance... team members. (1) Twelve self-contained breathing apparatus, each with a minimum of 4 hours capacity... apparatus and sufficient to sustain each team for 8 hours while using the breathing apparatus during rescue...
Renewal of radiological equipment.
2014-10-01
In this century, medical imaging is at the heart of medical practice. Besides providing fast and accurate diagnosis, advances in radiology equipment offer new and previously non-existing options for treatment guidance with quite low morbidity, resulting in the improvement of health outcomes and quality of life for the patients. Although rapid technological development created new medical imaging modalities and methods, the same progress speed resulted in accelerated technical and functional obsolescence of the same medical imaging equipment, consequently creating a need for renewal. Older equipment has a high risk of failures and breakdowns, which might cause delays in diagnosis and treatment of the patient, and safety problems both for the patient and the medical staff. The European Society of Radiology is promoting the use of up-to-date equipment, especially in the context of the EuroSafe Imaging Campaign, as the use of up-to-date equipment will improve quality and safety in medical imaging. Every healthcare institution or authority should have a plan for medical imaging equipment upgrade or renewal. This plan should look forward a minimum of 5 years, with annual updates. Teaching points • Radiological equipment has a definite life cycle span, resulting in unavoidable breakdown and decrease or loss of image quality which renders equipment useless after a certain time period.• Equipment older than 10 years is no longer state-of-the art equipment and replacement is essential. Operating costs of older equipment will be high when compared with new equipment, and sometimes maintenance will be impossible if no spare parts are available.• Older equipment has a high risk of failure and breakdown, causing delays in diagnosis and treatment of the patient and safety problems both for the patient and the medical staff.• Every healthcare institution or authority should have a plan for medical imaging equipment upgrade or replacement. This plan should look forward a minimum of 5 years, with annual updating.
Eichhorn, Volker; Henzler, Dietrich; Murphy, Michael F
2010-08-01
The purpose of this review is to summarize recommendations for the safe and efficient conductance of sedation and anesthesia at remote locations; and to define safety standards, monitoring techniques, quality of care and procedural eligibility. Anesthesia outside of the operating room is rapidly increasing in numbers, which has seen a growth of older and sicker patients. These circumstances have created a need for guidelines, for both specialist anesthesia providers and nonanesthesia-trained practitioners, that define patient selection, minimum monitoring (hemodynamics and respiration), facility design and equipment, policy framework, recovery facilities and policies. The patient's safety throughout all stages of sedation and/or anesthesia is the most pertinent goal. Recent data emphasize the importance of monitoring pulse oximetry and end-tidal carbon dioxide for any sedating or anesthetic procedure. Substandard monitoring combined with oversedation and subsequent respiratory depression are implicated as the main reasons for catastrophic sedation and anesthetic outcomes at remote locations. Patient selection, procedure appropriateness and location appropriateness are the key elements defining the provision of safe anesthesia care outside the operating room. Titratable, short-acting intravenous drugs are preferred such as propofol and remifentanil.
ERIC Educational Resources Information Center
Kubota, Keiichi; Fujikawa, Kiyoshi
2007-01-01
We implemented a synchronous distance course entitled: Introductory Finance designed for undergraduate students. This course was held between two Japanese universities. Stable Internet connections allowing minimum delay and minimum interruptions of the audio-video streaming signals were used. Students were equipped with their own PCs with…
30 CFR 75.1107-7 - Water spray devices; capacity; water supply; minimum requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Water spray devices; capacity; water supply... Water spray devices; capacity; water supply; minimum requirements. (a) Where water spray devices are... square foot over the top surface area of the equipment and the supply of water shall be adequate to...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Betzig, H.M.
1996-12-31
On September 26, Cris Lombardi and I presented a paper at the ARIPPA. The economic and environmental advantages available to CFB operators through the firing of tire-derived fuel (TDF) are discussed. The bottom line savings to the operation can be significant. It is believed that a regional scrap tire processing facility, capable of making properly-sized fuel, can be supported in Pennsylvania. An effort to develop such an operation is described. The technology for shredding and sizing TDF is well-proven. The proper equipment has been identified and reliable sources of scrap tires have been located. What is needed is to establishmore » a certain minimum annual TDF usage so that fuel user permit modification activity can begin. Data are presented on the production and use of TDF.« less
14 CFR 25.1393 - Minimum intensities in any vertical plane of forward and rear position lights.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Minimum intensities in any vertical plane... Equipment Lights § 25.1393 Minimum intensities in any vertical plane of forward and rear position lights... above or below the horizontal plane Intensity, l 0° 1.00 0° to 5° 0.90 5° to 10° 0.80 10° to 15° 0.70 15...
14 CFR 27.1393 - Minimum intensities in any vertical plane of forward and rear position lights.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Minimum intensities in any vertical plane... Equipment Lights § 27.1393 Minimum intensities in any vertical plane of forward and rear position lights... above or below the horizontal plane Intensity, l 0° 1.00 0° to 5° 0.90 5° to 10° 0.80 10° to 15° 0.70 15...
Effects of sample size and sampling frequency on studies of brown bear home ranges and habitat use
Arthur, Steve M.; Schwartz, Charles C.
1999-01-01
We equipped 9 brown bears (Ursus arctos) on the Kenai Peninsula, Alaska, with collars containing both conventional very-high-frequency (VHF) transmitters and global positioning system (GPS) receivers programmed to determine an animal's position at 5.75-hr intervals. We calculated minimum convex polygon (MCP) and fixed and adaptive kernel home ranges for randomly-selected subsets of the GPS data to examine the effects of sample size on accuracy and precision of home range estimates. We also compared results obtained by weekly aerial radiotracking versus more frequent GPS locations to test for biases in conventional radiotracking data. Home ranges based on the MCP were 20-606 km2 (x = 201) for aerial radiotracking data (n = 12-16 locations/bear) and 116-1,505 km2 (x = 522) for the complete GPS data sets (n = 245-466 locations/bear). Fixed kernel home ranges were 34-955 km2 (x = 224) for radiotracking data and 16-130 km2 (x = 60) for the GPS data. Differences between means for radiotracking and GPS data were due primarily to the larger samples provided by the GPS data. Means did not differ between radiotracking data and equivalent-sized subsets of GPS data (P > 0.10). For the MCP, home range area increased and variability decreased asymptotically with number of locations. For the kernel models, both area and variability decreased with increasing sample size. Simulations suggested that the MCP and kernel models required >60 and >80 locations, respectively, for estimates to be both accurate (change in area <1%/additional location) and precise (CV < 50%). Although the radiotracking data appeared unbiased, except for the relationship between area and sample size, these data failed to indicate some areas that likely were important to bears. Our results suggest that the usefulness of conventional radiotracking data may be limited by potential biases and variability due to small samples. Investigators that use home range estimates in statistical tests should consider the effects of variability of those estimates. Use of GPS-equipped collars can facilitate obtaining larger samples of unbiased data and improve accuracy and precision of home range estimates.
40 CFR Appendix B to Subpart B of... - Standard for Recover Equipment
Code of Federal Regulations, 2011 CFR
2011-07-01
... process it to ARI (Air-Conditioning and Refrigeration Institute) standard 700-93 as a minimum. It is not... equipment capability is required which shall process contaminated refrigerant samples at specific... flare male thread connection as identified in SAE J639 CFC-12 High Pressure Charging Valve Figure 2. 6.3...
40 CFR Appendix B to Subpart B of... - Standard for Recover Equipment
Code of Federal Regulations, 2013 CFR
2013-07-01
... process it to ARI (Air-Conditioning and Refrigeration Institute) standard 700-93 as a minimum. It is not... equipment capability is required which shall process contaminated refrigerant samples at specific... flare male thread connection as identified in SAE J639 CFC-12 High Pressure Charging Valve Figure 2. 6.3...
40 CFR Appendix B to Subpart B of... - Standard for Recover Equipment
Code of Federal Regulations, 2014 CFR
2014-07-01
... process it to ARI (Air-Conditioning and Refrigeration Institute) standard 700-93 as a minimum. It is not... equipment capability is required which shall process contaminated refrigerant samples at specific... flare male thread connection as identified in SAE J639 CFC-12 High Pressure Charging Valve Figure 2. 6.3...
40 CFR Appendix B to Subpart B of... - Standard for Recover Equipment
Code of Federal Regulations, 2012 CFR
2012-07-01
... process it to ARI (Air-Conditioning and Refrigeration Institute) standard 700-93 as a minimum. It is not... equipment capability is required which shall process contaminated refrigerant samples at specific... flare male thread connection as identified in SAE J639 CFC-12 High Pressure Charging Valve Figure 2. 6.3...
40 CFR Appendix B to Subpart B of... - Standard for Recover Equipment
Code of Federal Regulations, 2010 CFR
2010-07-01
... process it to ARI (Air-Conditioning and Refrigeration Institute) standard 700-93 as a minimum. It is not... equipment capability is required which shall process contaminated refrigerant samples at specific... flare male thread connection as identified in SAE J639 CFC-12 High Pressure Charging Valve Figure 2. 6.3...
49 CFR 238.230 - Safety appliances-new equipment.
Code of Federal Regulations, 2012 CFR
2012-10-01
... or supports considered part of the car body. Safety appliance brackets or supports will be considered part of the car body and will not be required to be mechanically fastened to the piece of passenger... equipment's body that is at a minimum 3/16-inch sheet steel or structurally reinforced to provide the...
49 CFR 238.230 - Safety appliances-new equipment.
Code of Federal Regulations, 2014 CFR
2014-10-01
... or supports considered part of the car body. Safety appliance brackets or supports will be considered part of the car body and will not be required to be mechanically fastened to the piece of passenger... equipment's body that is at a minimum 3/16-inch sheet steel or structurally reinforced to provide the...
49 CFR 238.230 - Safety appliances-new equipment.
Code of Federal Regulations, 2013 CFR
2013-10-01
... or supports considered part of the car body. Safety appliance brackets or supports will be considered part of the car body and will not be required to be mechanically fastened to the piece of passenger... equipment's body that is at a minimum 3/16-inch sheet steel or structurally reinforced to provide the...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-15
..., restaurants and other food service establishments. Cold storage includes the equipment used to store meat... equipment found in supermarkets, grocery and convenience stores, restaurants, and other food service... public comment on the selection of 24 hours as an appropriate amount of time, at a minimum, that must...
46 CFR 169.549 - Ring lifebuoys and water lights.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 7 2011-10-01 2011-10-01 false Ring lifebuoys and water lights. 169.549 Section 169.549 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Lifesaving and Firefighting Equipment Additional Lifesaving Equipment § 169.549 Ring lifebuoys and water lights. (a)(1) The minimum number of...
46 CFR 169.549 - Ring lifebuoys and water lights.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Ring lifebuoys and water lights. 169.549 Section 169.549 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Lifesaving and Firefighting Equipment Additional Lifesaving Equipment § 169.549 Ring lifebuoys and water lights. (a)(1) The minimum number of...
46 CFR 169.549 - Ring lifebuoys and water lights.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false Ring lifebuoys and water lights. 169.549 Section 169.549 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Lifesaving and Firefighting Equipment Additional Lifesaving Equipment § 169.549 Ring lifebuoys and water lights. (a)(1) The minimum number of...
49 CFR 229.123 - Pilots, snowplows, end plates.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Pilots, snowplows, end plates. 229.123 Section 229... Cab Equipment § 229.123 Pilots, snowplows, end plates. After January 1, 1981, each lead locomotive shall be equipped with an end plate that extends across both rails, a pilot, or a snowplow. The minimum...
49 CFR 229.123 - Pilots, snowplows, end plates.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 4 2011-10-01 2011-10-01 false Pilots, snowplows, end plates. 229.123 Section 229... Cab Equipment § 229.123 Pilots, snowplows, end plates. After January 1, 1981, each lead locomotive shall be equipped with an end plate that extends across both rails, a pilot, or a snowplow. The minimum...
Traveling wire electrode increases productivity of Electrical Discharge Machining /EDM/ equipment
NASA Technical Reports Server (NTRS)
Kotora, J., Jr.; Smith, S. V.
1967-01-01
Traveling wire electrode on electrical discharge machining /EDM/ equipment reduces the time requirements for precision cutting. This device enables cutting with a minimum of lost material and without inducing stress beyond that inherent in the material. The use of wire increases accuracy and enables tighter tolerances to be maintained.
Helicopter In-Flight Tracking System (HITS) for the Gulf of Mexico
NASA Technical Reports Server (NTRS)
Martone, Patrick; Tucker, George; Aiken, Edwin W. (Technical Monitor)
2001-01-01
The National Aeronautics and Space Administration (NASA) Ames Research Center (ARC) is sponsoring deployment and testing of the Helicopter In-flight Tracking System (HITS) in a portion of the Gulf of Mexico offshore area. Using multilateration principles, HITS determines the location and altitude of all transponder-equipped aircraft without requiring changes to current Mode A, C or S avionics. HITS tracks both rotary and fixed-wing aircraft operating in the 8,500 sq. mi. coverage region. The minimum coverage altitude of 100 ft. is beneficial for petroleum industry, allowing helicopters to be tracked onto the pad of most derricks. In addition to multilateration, HITS provides surveillance reports for aircraft equipped for Automatic Dependent Surveillance - Broadcast (ADS-B), a new surveillance system under development by the Federal Aviation Administration (FAA). The U.S. Department of Transportation (DOT) Volpe National Transportation Systems Center (Volpe Center) is supporting NASA in managing HITS installation and operation, and in evaluating the system's effectiveness. Senses Corporation is supplying, installing and maintaining the HITS ground system. Project activities are being coordinated with the FAA and local helicopter operators. Flight-testing in the Gulf will begin in early 2002. This paper describes the HITS project - specifically, the system equipment (architecture, remote sensors, central processing system at Intracoastal City, LA, and communications) and its performance (accuracy, coverage, and reliability). The paper also presents preliminary results of flight tests.
Stoller, James K; Roberts, Vincent; Matt, David; Chom, Leslie; Sasidhar, Madhu; Chatburn, Robert L
2013-12-01
When respiratory therapists (RTs) seek respiratory care equipment, finding it quickly is desirable, both to expedite patient care and to avert RTs wasting time. To optimize RTs' ability to quickly locate ventilators, we developed and implemented a radio-frequency identification (RFID) tagging system called eTrak. The Clinical Engineering and Information Technology groups at Cleveland Clinic collaboratively developed a Wi-Fi-based RFID program that used active RFID tags. Altogether, 218 ventilators, 82 noninvasive ventilators, and various non-respiratory equipment were tagged, beginning in March 2010. We calculated the difference in time required to locate equipment before versus after implementation. The eTrak system had a mean 145 log-ons per week over the first year of use, and was associated with a decreased time required for RTs to locate ventilators: median 18 min (range 1-45 min) versus 3 min (range 1-6 min) (P < .001). Surveys of RTs regarding whether equipment was hard to find before versus after implementing eTrak showed a non-significant trend toward improvement. An RFID tracking system for respiratory equipment shortened the time to locate ventilators and non-significantly improved RT satisfaction with finding equipment. RFID tagging of equipment warrants further investigation.
30 CFR 77.807-2 - Booms and masts; minimum distance from high-voltage lines.
Code of Federal Regulations, 2010 CFR
2010-07-01
...-voltage lines. 77.807-2 Section 77.807-2 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... WORK AREAS OF UNDERGROUND COAL MINES Surface High-Voltage Distribution § 77.807-2 Booms and masts; minimum distance from high-voltage lines. The booms and masts of equipment operated on the surface of any...
Takao, Hiroyuki; Yeh, Yu Chih; Arita, Hiroyuki; Obatake, Takumi; Sakano, Teppei; Kurihara, Minoru; Matsuki, Akira; Ishibashi, Toshihiro; Murayama, Yuichi
2016-10-01
Use of mobile phones has become a standard reality of everyday living for many people worldwide, including medical professionals, as data sharing has drastically helped to improve quality of care. This increase in the use of mobile phones within hospitals and medical facilities has raised concern regarding the influence of radio waves on medical equipment. Although comprehensive studies have examined the effects of electromagnetic interference from 2G wireless communication and personal digital cellular systems on medical equipment, similar studies on more recent wireless technologies such as Long Term Evolution, wideband code division multiple access, and high-speed uplink access have yet to be published. Numerous tests targeting current wireless technologies were conducted between December 2012 and March 2013 in an anechoic chamber, shielded from external radio signals, with a dipole antenna to assess the effects of smartphone interference on several types of medical equipment. The interference produced by electromagnetic waves across five frequency bands from four telecommunication standards was assessed on 49 components from 22 pieces of medical equipment. Of the 22 pieces of medical equipment tested, 13 experienced interference at maximum transmission power. In contrast, at minimum transmission power, the maximum interference distance varied from 2 to 5 cm for different wireless devices. Four machines were affected at the minimum transmission power, and the maximum interference distance at the maximum transmission power was 38 cm. Results show that the interference from smartphones on medical equipment is very controllable.
76 FR 52734 - Underwater Locating Devices (Acoustic) (Self-Powered)
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-23
...This notice announces the planned revocation of all Technical Standard Order authorizations (TSOA) issued for the production of Underwater Locating Devices (Acoustic) (Self-Powered) manufactured to the TSO-C121 and TSO-C121a specifications. These actions are necessary because the planned issuance of TSO-C121b, Underwater Locating Devices (Acoustic) (Self-Powered), with a minimum performance standard (MPS) that will increase the minimum operating life of Underwater Locating Devices from 30 days to 90 days.
77 FR 13174 - Underwater Locating Devices (Acoustic) (Self-Powered)
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-05
...This is a confirmation notice for the planned revocation of all Technical Standard Order authorizations issued for the production of Underwater Locating Devices (Acoustic) (Self-Powered) manufactured to the TSO-C121 and TSO-C121a specifications. These actions are necessary because the planned issuance of TSO-C121b, Underwater Locating Devices (Acoustic) (Self-Powered), minimum performance standard (MPS) will increase the minimum operating life of Underwater Locating Devices from 30 days to 90 days.
Code of Federal Regulations, 2011 CFR
2011-07-01
... separate grounding conductor located within the trailing cable of mobile and portable equipment and... conductor located within the direct-current power cable feeding stationary equipment and connected between... ground conductor connected between stationary equipment and the direct-current grounding medium; or, (d...
Code of Federal Regulations, 2012 CFR
2012-07-01
... separate grounding conductor located within the trailing cable of mobile and portable equipment and... conductor located within the direct-current power cable feeding stationary equipment and connected between... ground conductor connected between stationary equipment and the direct-current grounding medium; or, (d...
Code of Federal Regulations, 2013 CFR
2013-07-01
... separate grounding conductor located within the trailing cable of mobile and portable equipment and... conductor located within the direct-current power cable feeding stationary equipment and connected between... ground conductor connected between stationary equipment and the direct-current grounding medium; or, (d...
Code of Federal Regulations, 2010 CFR
2010-07-01
... separate grounding conductor located within the trailing cable of mobile and portable equipment and... conductor located within the direct-current power cable feeding stationary equipment and connected between... ground conductor connected between stationary equipment and the direct-current grounding medium; or, (d...
Code of Federal Regulations, 2014 CFR
2014-07-01
... separate grounding conductor located within the trailing cable of mobile and portable equipment and... conductor located within the direct-current power cable feeding stationary equipment and connected between... ground conductor connected between stationary equipment and the direct-current grounding medium; or, (d...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Pipe sizes and discharge rates for enclosed ventilation... Systems Fixed Carbon Dioxide Fire Extinguishing Systems § 108.437 Pipe sizes and discharge rates for enclosed ventilation systems for rotating electrical equipment. (a) The minimum pipe size for the initial...
Code of Federal Regulations, 2012 CFR
2012-04-01
... facilities shall be equipped with a security system that will provide suitable protection against theft and diversion. When appropriate, the security system shall provide protection against theft or diversion that is..., equipment, and security conditions; (3) Have a quarantine area for storage of prescription drugs that are...
Code of Federal Regulations, 2011 CFR
2011-04-01
... facilities shall be equipped with a security system that will provide suitable protection against theft and diversion. When appropriate, the security system shall provide protection against theft or diversion that is..., equipment, and security conditions; (3) Have a quarantine area for storage of prescription drugs that are...
Code of Federal Regulations, 2014 CFR
2014-04-01
... facilities shall be equipped with a security system that will provide suitable protection against theft and diversion. When appropriate, the security system shall provide protection against theft or diversion that is..., equipment, and security conditions; (3) Have a quarantine area for storage of prescription drugs that are...
Code of Federal Regulations, 2010 CFR
2010-04-01
... facilities shall be equipped with a security system that will provide suitable protection against theft and diversion. When appropriate, the security system shall provide protection against theft or diversion that is..., equipment, and security conditions; (3) Have a quarantine area for storage of prescription drugs that are...
The new Waste Law: Challenging opportunity for future landfill operation in Indonesia.
Meidiana, Christia; Gamse, Thomas
2011-01-01
The Waste Law No. 18/2008 Article 22 and 44 require the local governments to run environmentally sound landfill. Due to the widespread poor quality of waste management in Indonesia, this study aimed to identify the current situation by evaluating three selected landfills based on the ideal conditions of landfill practices, which are used to appraise the capability of local governments to adapt to the law. The results indicated that the local governments have problems of insufficient budget, inadequate equipment, uncollected waste and unplanned future landfill locations. All of the selected landfills were partially controlled landfills with open dumping practices predominating. In such inferior conditions the implementation of sanitary landfill is not necessarily appropriate. The controlled landfill is a more appropriate solution as it offers lower investment and operational costs, makes the selection of a new landfill site unnecessary and can operate with a minimum standard of infrastructure and equipment. The sustainability of future landfill capacity can be maintained by utilizing the old landfill as a profit-oriented landfill by implementing a landfill gas management or a clean development mechanism project. A collection fee system using the pay-as-you-throw principle could increase the waste income thereby financing municipal solid waste management.
Sevast'ianova, E V; Martynova, L P; Barilo, V N; Golyshevskaia, V I; Shul'gina, M V
2009-01-01
By taking into account the present requirements for the equipping of the laboratories, the authors have drawn up the minimum standard list of equipment, as well as a list of additional equipment for the specialized bacteriological laboratory of a tuberculosis-controlling institution, which performs microbiological studies for the diagnosis and control of chemotherapy for tuberculosis. The specifications and characteristics of the baric types of equipment used to fit out the laboratories under the present conditions are described. Equipping the laboratories in accordance with the draw-up lists is shown to ensure a qualitative, effective, and safe work. Recommendations on how to supply the laboratories with equipment, to make the optimal choice, and to use consumables for tests are given.
Analysis of Biaxial Stress Fields in Plates Cracking at Elevated Temperatures
1989-10-19
used . Based on the enhanced theory, it is predicted that the minimum resolvable stress amplitude using thermographic stress analysis will be...because of limitations in the commercial thermographic equipment used . Based on the enhanced theory, it is predicted that the minimum resolvable stress...amplitude using thermographic stress analysis will be approximately independent of temperature, provided relevant thermal and mechanical material
Code of Federal Regulations, 2010 CFR
2010-04-01
.... This subpart covers the minimum requirements for materials, products, equipment and workmanship needed...) Protection against corrosion, decay, insects and other similar destructive forces, (c) Protection against...
33 CFR 150.617 - What are the requirements for tagout?
Code of Federal Regulations, 2010 CFR
2010-07-01
... work takes place on equipment that is disconnected from the power source, a tag complying with this section is placed at the location where the power is disconnected. The operator must ensure that, if there is a control panel for the equipment in line between the equipment and the location where the power...
33 CFR 150.617 - What are the requirements for tagout?
Code of Federal Regulations, 2011 CFR
2011-07-01
... work takes place on equipment that is disconnected from the power source, a tag complying with this section is placed at the location where the power is disconnected. The operator must ensure that, if there is a control panel for the equipment in line between the equipment and the location where the power...
GPS System Specification for Shipboard TACAN Replacement.
1991-11-08
BE 0.4 uS 2II2I S FOR JTIDS INTEROPERAMILITY, OR 32 IaS FOR UNK4 OR LeAND LPiIAJ DATA LNK 64 AS MINIMUM SPACING Figure 3. Evolution of JTIDS Signal...the manufacturer of the equipment to prove that, if they receive the correct signal and the correct data, the equipment processes it properly to avoid
Code of Federal Regulations, 2014 CFR
2014-07-01
... requirements for the recovery/recycling of HFC-134a that has been directly removed from, and is intended for reuse in, mobile air-conditioning systems and recovery/recycling and system recharging of recycled... The purpose of this SAE Standard is to establish the specific minimum equipment performance...
45 CFR 2543.31 - Insurance coverage.
Code of Federal Regulations, 2014 CFR
2014-10-01
... GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT... minimum, provide the equivalent insurance coverage for real property and equipment acquired with Federal...
20 CFR 435.31 - Insurance coverage.
Code of Federal Regulations, 2014 CFR
2014-04-01
... AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT ORGANIZATIONS, AND COMMERCIAL... minimum, provide the equivalent insurance coverage for real property and equipment acquired with Federal...
45 CFR 2543.31 - Insurance coverage.
Code of Federal Regulations, 2012 CFR
2012-10-01
... GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT... minimum, provide the equivalent insurance coverage for real property and equipment acquired with Federal...
20 CFR 435.31 - Insurance coverage.
Code of Federal Regulations, 2010 CFR
2010-04-01
... AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT ORGANIZATIONS, AND COMMERCIAL... minimum, provide the equivalent insurance coverage for real property and equipment acquired with Federal...
20 CFR 435.31 - Insurance coverage.
Code of Federal Regulations, 2012 CFR
2012-04-01
... AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT ORGANIZATIONS, AND COMMERCIAL... minimum, provide the equivalent insurance coverage for real property and equipment acquired with Federal...
20 CFR 435.31 - Insurance coverage.
Code of Federal Regulations, 2011 CFR
2011-04-01
... AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT ORGANIZATIONS, AND COMMERCIAL... minimum, provide the equivalent insurance coverage for real property and equipment acquired with Federal...
45 CFR 2543.31 - Insurance coverage.
Code of Federal Regulations, 2011 CFR
2011-10-01
... GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT... minimum, provide the equivalent insurance coverage for real property and equipment acquired with Federal...
20 CFR 435.31 - Insurance coverage.
Code of Federal Regulations, 2013 CFR
2013-04-01
... AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT ORGANIZATIONS, AND COMMERCIAL... minimum, provide the equivalent insurance coverage for real property and equipment acquired with Federal...
45 CFR 2543.31 - Insurance coverage.
Code of Federal Regulations, 2013 CFR
2013-10-01
... GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT... minimum, provide the equivalent insurance coverage for real property and equipment acquired with Federal...
45 CFR 2543.31 - Insurance coverage.
Code of Federal Regulations, 2010 CFR
2010-10-01
... GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT... minimum, provide the equivalent insurance coverage for real property and equipment acquired with Federal...
46 CFR 108.421 - Location of fire pumps and associated equipment.
Code of Federal Regulations, 2011 CFR
2011-10-01
... pumps and associated equipment. Each fire pump required by § 108.415, and the source of power, controls... installed to protect at least one of the fire pumps, its source of power, and controls. ... 46 Shipping 4 2011-10-01 2011-10-01 false Location of fire pumps and associated equipment. 108.421...
46 CFR 108.421 - Location of fire pumps and associated equipment.
Code of Federal Regulations, 2014 CFR
2014-10-01
... pumps and associated equipment. Each fire pump required by § 108.415, and the source of power, controls... installed to protect at least one of the fire pumps, its source of power, and controls. ... 46 Shipping 4 2014-10-01 2014-10-01 false Location of fire pumps and associated equipment. 108.421...
46 CFR 108.421 - Location of fire pumps and associated equipment.
Code of Federal Regulations, 2012 CFR
2012-10-01
... pumps and associated equipment. Each fire pump required by § 108.415, and the source of power, controls... installed to protect at least one of the fire pumps, its source of power, and controls. ... 46 Shipping 4 2012-10-01 2012-10-01 false Location of fire pumps and associated equipment. 108.421...
46 CFR 108.421 - Location of fire pumps and associated equipment.
Code of Federal Regulations, 2013 CFR
2013-10-01
... pumps and associated equipment. Each fire pump required by § 108.415, and the source of power, controls... installed to protect at least one of the fire pumps, its source of power, and controls. ... 46 Shipping 4 2013-10-01 2013-10-01 false Location of fire pumps and associated equipment. 108.421...
30 CFR 75.1107-6 - Capacity of fire suppression devices; location and direction of nozzles.
Code of Federal Regulations, 2010 CFR
2010-07-01
... withstand rough usage and vibration when installed on mining equipment. (b) The extinguishant-discharge... electrical cables on the equipment which are subject to flexing or to external damage; and (2) All hydraulic components on the equipment which are exposed directly to or located in the immediate vicinity of electrical...
Point sensitive NMR imaging system using a magnetic field configuration with a spatial minimum
Eberhard, P.H.
A point-sensitive NMR imaging system in which a main solenoid coil produces a relatively strong and substantially uniform magnetic field and a pair of perturbing coils powered by current in the same direction superimposes a pair of relatively weak perturbing fields on the main field to produce a resultant point of minimum field strength at a desired location in a direction along the Z-axis. Two other pairs of perturbing coils superimpose relatively weak field gradients on the main field in directions along the X- and Y-axes to locate the minimum field point at a desired location in a plane normal to the Z-axes. An rf generator irradiates a tissue specimen in the field with radio frequency energy so that desired nuclei in a small volume at the point of minimum field strength will resonate.
28 CFR 70.31 - Insurance coverage.
Code of Federal Regulations, 2012 CFR
2012-07-01
... AND AGREEMENTS (INCLUDING SUBAWARDS) WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS AND OTHER NON... must, at a minimum, provide the equivalent insurance coverage for real property and equipment acquired...
40 CFR 30.31 - Insurance coverage.
Code of Federal Regulations, 2012 CFR
2012-07-01
... NON-PROFIT ORGANIZATIONS Post-Award Requirements Property Standards § 30.31 Insurance coverage. Recipients shall, at a minimum, provide the equivalent insurance coverage for real property and equipment...
28 CFR 70.31 - Insurance coverage.
Code of Federal Regulations, 2013 CFR
2013-07-01
... AND AGREEMENTS (INCLUDING SUBAWARDS) WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS AND OTHER NON... must, at a minimum, provide the equivalent insurance coverage for real property and equipment acquired...
40 CFR 30.31 - Insurance coverage.
Code of Federal Regulations, 2014 CFR
2014-07-01
... NON-PROFIT ORGANIZATIONS Post-Award Requirements Property Standards § 30.31 Insurance coverage. Recipients shall, at a minimum, provide the equivalent insurance coverage for real property and equipment...
28 CFR 70.31 - Insurance coverage.
Code of Federal Regulations, 2010 CFR
2010-07-01
... AND AGREEMENTS (INCLUDING SUBAWARDS) WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS AND OTHER NON... must, at a minimum, provide the equivalent insurance coverage for real property and equipment acquired...
32 CFR 32.31 - Insurance coverage.
Code of Federal Regulations, 2012 CFR
2012-07-01
... NON-PROFIT ORGANIZATIONS Post-Award Requirements Property Standards § 32.31 Insurance coverage. Recipients shall, at a minimum, provide the equivalent insurance coverage for real property and equipment...
32 CFR 32.31 - Insurance coverage.
Code of Federal Regulations, 2013 CFR
2013-07-01
... NON-PROFIT ORGANIZATIONS Post-Award Requirements Property Standards § 32.31 Insurance coverage. Recipients shall, at a minimum, provide the equivalent insurance coverage for real property and equipment...
32 CFR 32.31 - Insurance coverage.
Code of Federal Regulations, 2011 CFR
2011-07-01
... NON-PROFIT ORGANIZATIONS Post-Award Requirements Property Standards § 32.31 Insurance coverage. Recipients shall, at a minimum, provide the equivalent insurance coverage for real property and equipment...
38 CFR 49.31 - Insurance coverage.
Code of Federal Regulations, 2014 CFR
2014-07-01
... NON-PROFIT ORGANIZATIONS Post-Award Requirements Property Standards § 49.31 Insurance coverage. Recipients shall, at a minimum, provide the equivalent insurance coverage for real property and equipment...
38 CFR 49.31 - Insurance coverage.
Code of Federal Regulations, 2010 CFR
2010-07-01
... NON-PROFIT ORGANIZATIONS Post-Award Requirements Property Standards § 49.31 Insurance coverage. Recipients shall, at a minimum, provide the equivalent insurance coverage for real property and equipment...
28 CFR 70.31 - Insurance coverage.
Code of Federal Regulations, 2014 CFR
2014-07-01
... AND AGREEMENTS (INCLUDING SUBAWARDS) WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS AND OTHER NON... must, at a minimum, provide the equivalent insurance coverage for real property and equipment acquired...
40 CFR 30.31 - Insurance coverage.
Code of Federal Regulations, 2013 CFR
2013-07-01
... NON-PROFIT ORGANIZATIONS Post-Award Requirements Property Standards § 30.31 Insurance coverage. Recipients shall, at a minimum, provide the equivalent insurance coverage for real property and equipment...
32 CFR 32.31 - Insurance coverage.
Code of Federal Regulations, 2014 CFR
2014-07-01
... NON-PROFIT ORGANIZATIONS Post-Award Requirements Property Standards § 32.31 Insurance coverage. Recipients shall, at a minimum, provide the equivalent insurance coverage for real property and equipment...
40 CFR 30.31 - Insurance coverage.
Code of Federal Regulations, 2011 CFR
2011-07-01
... NON-PROFIT ORGANIZATIONS Post-Award Requirements Property Standards § 30.31 Insurance coverage. Recipients shall, at a minimum, provide the equivalent insurance coverage for real property and equipment...
38 CFR 49.31 - Insurance coverage.
Code of Federal Regulations, 2013 CFR
2013-07-01
... NON-PROFIT ORGANIZATIONS Post-Award Requirements Property Standards § 49.31 Insurance coverage. Recipients shall, at a minimum, provide the equivalent insurance coverage for real property and equipment...
38 CFR 49.31 - Insurance coverage.
Code of Federal Regulations, 2011 CFR
2011-07-01
... NON-PROFIT ORGANIZATIONS Post-Award Requirements Property Standards § 49.31 Insurance coverage. Recipients shall, at a minimum, provide the equivalent insurance coverage for real property and equipment...
28 CFR 70.31 - Insurance coverage.
Code of Federal Regulations, 2011 CFR
2011-07-01
... AND AGREEMENTS (INCLUDING SUBAWARDS) WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS AND OTHER NON... must, at a minimum, provide the equivalent insurance coverage for real property and equipment acquired...
32 CFR 32.31 - Insurance coverage.
Code of Federal Regulations, 2010 CFR
2010-07-01
... NON-PROFIT ORGANIZATIONS Post-Award Requirements Property Standards § 32.31 Insurance coverage. Recipients shall, at a minimum, provide the equivalent insurance coverage for real property and equipment...
2 CFR 215.31 - Insurance coverage.
Code of Federal Regulations, 2013 CFR
2013-01-01
... AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS (OMB CIRCULAR... a minimum, provide the equivalent insurance coverage for real property and equipment acquired with...
38 CFR 49.31 - Insurance coverage.
Code of Federal Regulations, 2012 CFR
2012-07-01
... NON-PROFIT ORGANIZATIONS Post-Award Requirements Property Standards § 49.31 Insurance coverage. Recipients shall, at a minimum, provide the equivalent insurance coverage for real property and equipment...
40 CFR 30.31 - Insurance coverage.
Code of Federal Regulations, 2010 CFR
2010-07-01
... NON-PROFIT ORGANIZATIONS Post-Award Requirements Property Standards § 30.31 Insurance coverage. Recipients shall, at a minimum, provide the equivalent insurance coverage for real property and equipment...
Irradiance of phototherapy equipment in maternity wards in Maceió.
Ferreira, Anne Laura Costa; Nascimento, Renata Medeiros do; Veríssimo, Regina Célia Sales Santos
2009-01-01
The effectiveness of neonatal hyperbilirubinaemia treatment depends directly on the amount of energy emitted by light (irradiance). This cross-sectional study aimed to determine the irradiance of phototherapy equipment in maternity wards in Maceió, AL, Brazil. All equipment in use in the neonatal units in Maceió was included in the study, totaling 36 devices, except those in maintenance. The measurement of irradiance was carried out with a radiometer. We observed that 72.20% of the equipment presented efficient irradiance and 27.76% were inefficient. The conclusion is that the majority of phototherapy devices are emitting the minimum required irradiance for neonatal jaundice treatment.
DOT National Transportation Integrated Search
2009-01-13
This research effort was to investigate whether spatial locating equipment or Global Positioning System (GPS) equipment mounted on Connecticut Department of Transportation (ConnDOT) ARAN vans could be used to locate areas of distressed pavement. It w...
Duncan, Edward A S; Colver, Keith; Dougall, Nadine; Swingler, Kevin; Stephenson, John; Abhyankar, Purva
2014-02-22
Major short-notice or sudden impact incidents, which result in a large number of casualties, are rare events. However health services must be prepared to respond to such events appropriately. In the United Kingdom (UK), a mass casualties incident is when the normal response of several National Health Service organizations to a major incident, has to be supported with extraordinary measures. Having the right type and quantity of clinical equipment is essential, but planning for such emergencies is challenging. To date, the equipment stored for such events has been selected on the basis of local clinical judgment and has evolved without an explicit evidence-base. This has resulted in considerable variations in the types and quantities of clinical equipment being stored in different locations. This study aimed to develop an expert consensus opinion of the essential items and minimum quantities of clinical equipment that is required to treat 100 people at the scene of a big bang mass casualties event. A three round modified Delphi study was conducted with 32 experts using a specifically developed web-based platform. Individuals were invited to participate if they had personal clinical experience of providing a pre-hospital emergency medical response to a mass casualties incident, or had responsibility in health emergency planning for mass casualties incidents and were in a position of authority within the sphere of emergency health planning. Each item's importance was measured on a 5-point Likert scale. The quantity of items required was measured numerically. Data were analyzed using nonparametric statistics. Experts achieved consensus on a total of 134 items (54%) on completion of the study. Experts did not reach consensus on 114 (46%) items. Median quantities and interquartile ranges of the items, and their recommended quantities were identified and are presented. This study is the first to produce an expert consensus on the items and quantities of clinical equipment that are required to treat 100 people at the scene of a big bang mass casualties event. The findings can be used, both in the UK and internationally, to support decision makers in the planning of equipment for such incidents.
15 CFR 14.31 - Insurance coverage.
Code of Federal Regulations, 2012 CFR
2012-01-01
... FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT, AND... shall, at a minimum, provide the equivalent insurance coverage for real property and equipment acquired...
15 CFR 14.31 - Insurance coverage.
Code of Federal Regulations, 2010 CFR
2010-01-01
... FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT, AND... shall, at a minimum, provide the equivalent insurance coverage for real property and equipment acquired...
15 CFR 14.31 - Insurance coverage.
Code of Federal Regulations, 2011 CFR
2011-01-01
... FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT, AND... shall, at a minimum, provide the equivalent insurance coverage for real property and equipment acquired...
15 CFR 14.31 - Insurance coverage.
Code of Federal Regulations, 2014 CFR
2014-01-01
... FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT, AND... shall, at a minimum, provide the equivalent insurance coverage for real property and equipment acquired...
15 CFR 14.31 - Insurance coverage.
Code of Federal Regulations, 2013 CFR
2013-01-01
... FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT, AND... shall, at a minimum, provide the equivalent insurance coverage for real property and equipment acquired...
High-speed railway signal trackside equipment patrol inspection system
NASA Astrophysics Data System (ADS)
Wu, Nan
2018-03-01
High-speed railway signal trackside equipment patrol inspection system comprehensively applies TDI (time delay integration), high-speed and highly responsive CMOS architecture, low illumination photosensitive technique, image data compression technique, machine vision technique and so on, installed on high-speed railway inspection train, and achieves the collection, management and analysis of the images of signal trackside equipment appearance while the train is running. The system will automatically filter out the signal trackside equipment images from a large number of the background image, and identify of the equipment changes by comparing the original image data. Combining with ledger data and train location information, the system accurately locate the trackside equipment, conscientiously guiding maintenance.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-02
... purchase equipment to produce 75,000 solar panels annually in a plant located in Hattiesburg, Mississippi... 4279-2) for the following: Applicant/Location: Stion Solar Mississippi, LLC & Stion Equipment Leasing...
46 CFR 28.825 - Excess fire detection and protection equipment.
Code of Federal Regulations, 2012 CFR
2012-10-01
... appropriate] FIRE SYSTEM.” (v) Instructions for the operation of the system must be located in a conspicuous... be in a break-glass-type box conspicuously located adjacent to the opening, and; (vii) Be equipped...
46 CFR 28.825 - Excess fire detection and protection equipment.
Code of Federal Regulations, 2013 CFR
2013-10-01
... appropriate] FIRE SYSTEM.” (v) Instructions for the operation of the system must be located in a conspicuous... be in a break-glass-type box conspicuously located adjacent to the opening, and; (vii) Be equipped...
46 CFR 28.825 - Excess fire detection and protection equipment.
Code of Federal Regulations, 2014 CFR
2014-10-01
... appropriate] FIRE SYSTEM.” (v) Instructions for the operation of the system must be located in a conspicuous... be in a break-glass-type box conspicuously located adjacent to the opening, and; (vii) Be equipped...
Retrofitting the Williams Energy Services Ignacio Plant for higher throughput and recovery
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynch, J.T.; Pitman, R.N.
1999-07-01
The Ignacio Plant located near Durango, Colorado was originally designed to process 346 MMscfd of feed gas and to recover approximately 82% of the contained ethane. Based on increasing volumes of available feed gas, Williams Energy Services (WES) undertook a study to investigate alternatives for increasing plant capacity and ethane recovery. This study led to the selection of Ortloff's Recycle Split-Vapor (RSV) process for retrofitting the existing facility because it offered several very important advantages: maximum utilization of existing equipment, a 30% increase in plant feed handling capacity and an increase in average ethane recovery to 94% without adding residuemore » compressors. This paper presents the comparative case analysis that led to the selection of the RSV design. It also describes the modifications required for the retrofit, all of which can be accomplished with minimum plant down time. The modified Ignacio Plant is scheduled for startup in March 1999.« less
A descriptive study of ninety-two hospital libraries in Mexico.
Macías-Chapula, C A
1995-01-01
This work reports on the existing situation of ninety-two hospital libraries, located at Mexico's Social Security Institute (IMSS). A descriptive, systems approach was used to explore the physical structure and space of the libraries, staff, furniture, equipment, collections, services, organization and management, and users. Structured interviews were applied to each hospital library, and a questionnaire was used as a tool to collect data. A "control" system, designed to measure the status of each library, was applied through the assignment of values to several indicators, derived from IMSS policy manuals. This procedure helped to identify which library was "more" or "less" adequate to IMSS standards. Within the rank of 10 to 1 (10 = optimum; 1 = minimum), the mean rank of IMSS hospital libraries was 6. The major deficiencies found were those related to furniture (ranked 4) and services (ranked 5) and the lack of library professionals found in 92% of the libraries.
EPA maintains a variety of equipment to respond to hazardous substance emergencies such as releases or oil spills regardless of their nature, size, or location. This include ASPECT, PHILIS, Equipment Module (EM), and personal protective equipment.
System Control for the Transitional DCS.
1978-12-01
hour. The equipment destroyed includes the TTC-39 switch, all RF and multiplex equipment, emergency power equipment, distribution frames, antennal and...switch executes loop test to Rhein Main ULS, activating a local alarm at Donnersberg. Since restoral activity has not already been completed, alarm is...ITEM COMMENTS (BYTES) Loop ID Switch number and physical loop number 6 (BCD). Loop circuit CCSD 8 Telephone number 3 Location Physical location of
24 CFR 3280.813 - Outdoor outlets, fixtures, air-conditioning equipment, etc.
Code of Federal Regulations, 2013 CFR
2013-04-01
... the home or located under roof extensions or similarly protected locations, they may be listed for use..., adjacent to the outlet, a metal tag which reads: This Connection Is for Air Conditioning Equipment Rated at...
24 CFR 3280.813 - Outdoor outlets, fixtures, air-conditioning equipment, etc.
Code of Federal Regulations, 2012 CFR
2012-04-01
... the home or located under roof extensions or similarly protected locations, they may be listed for use..., adjacent to the outlet, a metal tag which reads: This Connection Is for Air Conditioning Equipment Rated at...
24 CFR 3280.813 - Outdoor outlets, fixtures, air-conditioning equipment, etc.
Code of Federal Regulations, 2011 CFR
2011-04-01
... the home or located under roof extensions or similarly protected locations, they may be listed for use..., adjacent to the outlet, a metal tag which reads: This Connection Is for Air Conditioning Equipment Rated at...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-28
... certification for Radio Frequency Identification (RFID) Equipment to register the location of the equipment...) of the equipment. The improved RFID equipment could benefit commercial shippers and have significant...
[Interhospital transfer--clinical approach: equipment, risks and complications].
Melzer-Gartzke, Christoph
2013-05-01
Interhospital transfers are an integral part of German health care system and a prerequisite to provide specialist investigation, management and best possible outcome for all patients irrespective of regional differences in medical care. In order to reduce transport associated risks to a minimum, adequate specialized transport teams and modern equipped transport vehicles are needed better and better adapted to regional and demographic changes. © Georg Thieme Verlag Stuttgart · New York.
Point sensitive NMR imaging system using a magnetic field configuration with a spatial minimum
Eberhard, Philippe H.
1985-01-01
A point-sensitive NMR imaging system (10) in which a main solenoid coil (11) produces a relatively strong and substantially uniform magnetic field and a pair of perturbing coils (PZ1 and PZ2) powered by current in the same direction superimposes a pair of relatively weak perturbing fields on the main field to produce a resultant point of minimum field strength at a desired location in a direction along the Z-axis. Two other pairs of perturbing coils (PX1, PX2; PY1, PY2) superimpose relatively weak field gradients on the main field in directions along the X- and Y-axes to locate the minimum field point at a desired location in a plane normal to the Z-axes. An RF generator (22) irradiates a tissue specimen in the field with radio frequency energy so that desired nuclei in a small volume at the point of minimum field strength will resonate.
NASA safety standard for lifting devices and equipment
NASA Astrophysics Data System (ADS)
1990-09-01
NASA's minimum safety requirements are established for the design, testing, inspection, maintenance, certification, and use of overhead and gantry cranes (including top running monorail, underhung, and jib cranes), mobile cranes, derrick hoists, and special hoist supported personnel lifting devices (these do not include elevators, ground supported personnel lifts, or powered platforms). Minimum requirements are also addressed for the testing, inspection, and use of Hydra-sets, hooks, and slings. Safety standards are thoroughly detailed.
NASA safety standard for lifting devices and equipment
NASA Technical Reports Server (NTRS)
1990-01-01
NASA's minimum safety requirements are established for the design, testing, inspection, maintenance, certification, and use of overhead and gantry cranes (including top running monorail, underhung, and jib cranes), mobile cranes, derrick hoists, and special hoist supported personnel lifting devices (these do not include elevators, ground supported personnel lifts, or powered platforms). Minimum requirements are also addressed for the testing, inspection, and use of Hydra-sets, hooks, and slings. Safety standards are thoroughly detailed.
42 CFR 84.201 - Head harnesses; minimum requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... of pressure over the entire area in contact with the face. (2) Facepieces for single-use vinyl... face. (b) Mouthpieces shall be equipped where applicable, with an adjustable and replaceable harness...
Airport Fire and Rescue Personnel Protective Clothing
DOT National Transportation Integrated Search
1995-07-13
This advisory circular (AC) identifies minimum standards for design, performance, : testing, and safety of personnel protective equipment (PPE), frequently referred : to as personnel protective clothing for airport firefighting. This AC also : assist...
2 CFR 200.310 - Insurance coverage.
Code of Federal Regulations, 2014 CFR
2014-01-01
.... The non-Federal entity must, at a minimum, provide the equivalent insurance coverage for real property and equipment acquired or improved with Federal funds as provided to property owned by the non-Federal...
Jacobsen, S; Stauffer, P R; Neuman, D G
2000-11-01
Hyperthermia therapy of superficial skin disease has proven clinically useful, but current heating equipment is somewhat clumsy and technically inadequate for many patients. The present effort describes a dual-purpose, conformal microwave applicator that is fabricated from thin, flexible, multilayer printed circuit board (PCB) material to facilitate heating of surface areas overlaying contoured anatomy. Preliminary studies document the feasibility of combining Archimedean spiral microstrip antennas, located concentrically within the central region of square dual concentric conductor (DCC) annular slot antennas. The motivation is to achieve homogeneous tissue heating simultaneously with noninvasive thermometry by radiometric sensing of blackbody radiation from the target tissue under the applicator. Results demonstrate that the two antennas have complimentary regions of influence. The DCC ring antenna structure produces a peripherally enhanced power deposition pattern with peaks in the outer corners of the aperture and a broad minimum around 50% of maximum centrally. In contrast, the Archimedean spiral radiates (or receives) energy predominantly along the boresight axis of the spiral, thus confining the region of influence to tissue located within the central broad minimum of the DCC pattern. Analysis of the temperature-dependent radiometer signal (brightness temperature) showed linear correlation of radiometer output with test load temperature using either the spiral or DCC structure as the receive antenna. The radiometric performance of the broadband Archimedean antenna was superior compared to the DCC, providing improved temperature resolution (0.1 degree C-0.2 degree C) and signal sensitivity (0.3 degree C-0.8 degree C/degree C) at all four 500 MHz integration bandwidths tested within the frequency range from 1.2 to 3.0 GHz.
NASA Astrophysics Data System (ADS)
Johnson, Derek; Heltzel, Robert
2016-11-01
Greenhouse Gas (GHG) emissions are a growing problem in the United States (US). Methane (CH4) is a potent GHG produced by several stages of the natural gas sector. Current scrutiny focuses on the natural gas boom associated with unconventional shale gas; however, focus should still be given to conventional wells and outdated equipment. In an attempt to quantify these emissions, researchers modified an off-road utility terrain vehicle (UTV) to include a Full Flow Sampling system (FFS) for methane quantification. GHG emissions were measured from non-producing and remote low throughput natural gas components in the Marcellus region. Site audits were conducted at eleven locations and leaks were identified and quantified at seven locations including at a low throughput conventional gas and oil well, two out-of-service gathering compressors, a conventional natural gas well, a coalbed methane well, and two conventional and operating gathering compressors. No leaks were detected at the four remaining sites, all of which were coal bed methane wells. The total methane emissions rate from all sources measured was 5.3 ± 0.23 kg/hr, at a minimum.
40 CFR 160.61 - Equipment design.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 24 2011-07-01 2011-07-01 false Equipment design. 160.61 Section 160... LABORATORY PRACTICE STANDARDS Equipment § 160.61 Equipment design. Equipment used in the generation... appropriate design and adequate capacity to function according to the protocol and shall be suitably located...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1991-03-01
The petroleum sector in Ecuador brings in about 65 percent of the country's revenue. Three of the refineries are located in the coastal region. The other two, plus the Liquified Petroleum Gas Plant (LPG), are located in the Oriente region (Amazon jungle). The refineries operate at about 85% of their installation capacity. The Petroindustrial and Petropeninsula investment plan for 1991 comtemplates the expansion of the Esmeraldas refinery to 110,000 barrels a day, and the up-grading of the Shushufindi and Libertad refineries located near the city of Guayaquil. The United States is by far the largest supplier of refinery equipment, partsmore » and accessories, controlling about 90% of the total market.« less
Response personnel must wear the appropriate level of protection whenever near a hazardous release site. Level A is for the greatest exposure potential, and D is the minimum level. Examples range from totally encapsulated suits to hard hats.
Cosmic Ray Hits in the Central Nervous System at Solar Maximum
NASA Technical Reports Server (NTRS)
Curtis, S. B.; Vazquez, M. E.; Wilson, J. W.; Atwell, W.; Kin, M.-H. Y.
2000-01-01
It has been suggested that a manned mission to Mars be launched at solar maximum rather than at solar minimum to minimize the radiation exposure to galactic cosmic rays. It is true that the number of hits from highly ionizing particles to critical regions in the brain will be less at solar maximum, and it is of interest to estimate how much less. We present here calculations for several sites within the brain from iron ions (z = 26) and from particles with charge, z, greater than or equal to 15. The same shielding configurations and sites in the brain used in an earlier paper for solar minimum are employed so that direct comparison of results between the two solar activity conditions can be made. A simple pressure-vessel wall and an equipment room onboard a spacecraft are chosen as shielding examples. In the equipment room, typical results for the thalamus are that the probability of any particles with z greater than or equal to 15 and from 2.3 percent to 1.3 percent for iron ions. The extra shielding provided in the equipment room makes little difference in these numbers. We conclude that this decrease in hit frequency (less than a factor of two) does not provide a compelling reason to avoid solar minimum for a manned mission to Mars. This conclusion could be revised, however, if a very small number of hits is found to cause critical malfunction within the brain.
Cosmic Ray Hits in the Central Nervous System at Solar Maximum
NASA Technical Reports Server (NTRS)
Curtis, S. B.; Vazquez, M. E.; Wilson, J. W.; Kim, M.-H. Y.
1997-01-01
It has been suggested that a manned mission to Mars be launched at solar maximum rather than at solar minimum to minimize the radiation exposure to galactic cosmic rays. It is true that the number of hits from highly ionizing particles to critical regions in the brain will be less at solar maximum, and it is of some interest to estimate how much less. We present here calculations for several sites within the brain from iron ions (z = 26) and from particles with charge, z, greater than or equal to 15. The same shielding configurations and sites in the brain used in an earlier paper for solar minimum are employed so that direct comparison of results between the two solar activity conditions can be made. A simple pressure-vessel wall and an equipment room onboard a spacecraft are chosen as shielding examples. In the equipment room, typical results for the thalamus (100 mm2 area) are that the probability of any given cell nucleus being hit decreases from 10 percent at solar minimum to 6 percent at solar maximum for particles with z greater than or equal to 15 and from 2.3 percent to 1.3 percent for iron ions. We conclude that this modest decrease in hit frequency (less than a factor of two) is not a compelling reason to avoid solar minimum for a manned mission to Mars.
STS-57 crewmembers examine stowage locker contents during bench review
NASA Technical Reports Server (NTRS)
1993-01-01
STS-57 Endeavour, Orbiter Vehicle (OV) 105, crewmembers, wearing clean suits, examine stowage locker contents during their bench review at Boeing's Flight Equipment Processing Facility (FEPF) located near JSC. Pilot Brian J. Duffy pulls equipment from a locker while Commander Ronald J. Grabe (behind him), Mission Specialist 2 (MS2) Nancy J. Sherlock, Payload Commander (PLC) G. David Low (holding checklist), and MS3 Peter J.K. Wisoff discuss checklist procedures. The crewmembers reviewed equipment locations for OV-105 as well as the SPACEHAB-01 (Commercial Middeck Augmentation Module (CMAM)) experiment stowage locations. Photo taken by NASA JSC contract photographer Benny Benavides.
Using Circus Stunts in the Physical Education Program
ERIC Educational Resources Information Center
Burkel, John R.
1969-01-01
To eliminate boredom, a three week unit of circus stunts requiring little space and a minimum of equipment was presented to a senior boys' gym class at Miles Township High School West, Skokie, Illinois. (AP)
77 FR 58473 - Minimum Technical Standards for Class II Gaming Systems and Equipment
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-21
... as printed advertising material that cannot be validated directly by a voucher system. Critical... on that component. EPROM. Erasable Programmable Read Only Memory--a non-volatile storage chip or...
47 CFR 36.125 - Local switching equipment-Category 3.
Code of Federal Regulations, 2010 CFR
2010-10-01
... electronic analog or digital remote line locations. Equipment used for the identification, recording and... which has a common intermediate distributing frame, market group or other separately identifiable... composed of an electronic analog or digital host office and all of its remote locations. A host/remote...
46 CFR 154.908 - Inert gas generator: Location.
Code of Federal Regulations, 2011 CFR
2011-10-01
... STANDARDS FOR SELF-PROPELLED VESSELS CARRYING BULK LIQUEFIED GASES Design, Construction and Equipment Atmospheric Control in Cargo Containment Systems § 154.908 Inert gas generator: Location. (a) Except as..., service, or control space. (b) An inert gas generator that does not use flame burning equipment may be...
40 CFR 63.1452 - What are my monitoring requirements?
Code of Federal Regulations, 2014 CFR
2014-07-01
... device, associated sensor(s), and recording equipment according to the manufacturers' specifications. Locate the sensor(s) used for monitoring in or as close to a position that provides a representative... section. (i) Locate the flow sensor and other necessary equipment such as straightening vanes in a...
40 CFR 63.1452 - What are my monitoring requirements?
Code of Federal Regulations, 2012 CFR
2012-07-01
... device, associated sensor(s), and recording equipment according to the manufacturers' specifications. Locate the sensor(s) used for monitoring in or as close to a position that provides a representative... section. (i) Locate the flow sensor and other necessary equipment such as straightening vanes in a...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-20
... for Locating People Using Electricity Dependent Medical Equipment During Public Health Emergencies... People Using Electricity Dependent Medical Equipment During Public Health Emergencies'' Ideation... people get the necessary help as quickly as possible. Submissions can be existing applications, or...
Code of Federal Regulations, 2010 CFR
2010-04-01
... CURRENT GOOD MANUFACTURING PRACTICE FOR TYPE A MEDICATED ARTICLES Construction and Maintenance of Facilities and Equipment § 226.30 Equipment. Equipment used for the manufacture, processing, packaging, bulk... maintained in a clean and orderly manner and shall be of suitable design, size, construction, and location to...
41 CFR 101-25.109-2 - Equipment pools.
Code of Federal Regulations, 2010 CFR
2010-07-01
... number and location of equipment pools, consideration shall be given to economy of operation, mobility of... available for sharing or loan. Information concerning the availability of this equipment can be maintained...
46 CFR 197.314 - First aid and treatment equipment.
Code of Federal Regulations, 2013 CFR
2013-10-01
... treatment equipment. (a) Each dive location must have— (1) A medical kit approved by a physician that... communications system to obtain emergency assistance except when the vessel or facility ship-to-shore, two-way communications system is readily available. (c) Each dive location supporting mixed-gas dives, dives deeper than...
46 CFR 197.314 - First aid and treatment equipment.
Code of Federal Regulations, 2014 CFR
2014-10-01
... treatment equipment. (a) Each dive location must have— (1) A medical kit approved by a physician that... communications system to obtain emergency assistance except when the vessel or facility ship-to-shore, two-way communications system is readily available. (c) Each dive location supporting mixed-gas dives, dives deeper than...
46 CFR 197.314 - First aid and treatment equipment.
Code of Federal Regulations, 2011 CFR
2011-10-01
... treatment equipment. (a) Each dive location must have— (1) A medical kit approved by a physician that... communications system to obtain emergency assistance except when the vessel or facility ship-to-shore, two-way communications system is readily available. (c) Each dive location supporting mixed-gas dives, dives deeper than...
33 CFR 150.610 - Where must eyewash equipment be located?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false Where must eyewash equipment be located? 150.610 Section 150.610 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) DEEPWATER PORTS DEEPWATER PORTS: OPERATIONS Workplace Safety and Health Eyes and Face...
33 CFR 150.610 - Where must eyewash equipment be located?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false Where must eyewash equipment be located? 150.610 Section 150.610 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) DEEPWATER PORTS DEEPWATER PORTS: OPERATIONS Workplace Safety and Health Eyes and Face...
33 CFR 150.610 - Where must eyewash equipment be located?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Where must eyewash equipment be located? 150.610 Section 150.610 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) DEEPWATER PORTS DEEPWATER PORTS: OPERATIONS Workplace Safety and Health Eyes and Face...
33 CFR 150.610 - Where must eyewash equipment be located?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Where must eyewash equipment be located? 150.610 Section 150.610 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) DEEPWATER PORTS DEEPWATER PORTS: OPERATIONS Workplace Safety and Health Eyes and Face...
33 CFR 150.610 - Where must eyewash equipment be located?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Where must eyewash equipment be located? 150.610 Section 150.610 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) DEEPWATER PORTS DEEPWATER PORTS: OPERATIONS Workplace Safety and Health Eyes and Face...
Warranty-Guarantee Application Guidelines for Air Force Ground Electronic Equipment.
1980-02-01
perform the on-equipment maintenance. The procedure is comparable to existing Mobile Depot Mainte- nance. The extended outage of failed equipment may be...currently computed. However, because the equipment is fixed geographically, in contrast to the mobility of avionics equipment, operating-time logs could...base environment, many other items of ground equip- ment are deployed at a remote location or, particularly in TAC, may be mobile equipment not
[A design of software for management of hospital equipment maintenance process].
Xie, Haiyuan; Liu, Yiqing
2010-03-01
According to the circumstance of hospital equipment maintenance, we designed a computer program for management of hospital equipment maintenance process by Java programming language. This program can control the maintenance process, increase the efficiency; and be able to fix the equipment location.
47 CFR 73.189 - Minimum antenna heights or field strength requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 4 2012-10-01 2012-10-01 false Minimum antenna heights or field strength... RADIO SERVICES RADIO BROADCAST SERVICES AM Broadcast Stations § 73.189 Minimum antenna heights or field..., frequency, or transmitter location must also request authority to install a new antenna system or to make...
47 CFR 73.189 - Minimum antenna heights or field strength requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 4 2014-10-01 2014-10-01 false Minimum antenna heights or field strength... RADIO SERVICES RADIO BROADCAST SERVICES AM Broadcast Stations § 73.189 Minimum antenna heights or field..., frequency, or transmitter location must also request authority to install a new antenna system or to make...
47 CFR 73.189 - Minimum antenna heights or field strength requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 4 2010-10-01 2010-10-01 false Minimum antenna heights or field strength... RADIO SERVICES RADIO BROADCAST SERVICES AM Broadcast Stations § 73.189 Minimum antenna heights or field..., frequency, or transmitter location must also request authority to install a new antenna system or to make...
47 CFR 73.189 - Minimum antenna heights or field strength requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 4 2011-10-01 2011-10-01 false Minimum antenna heights or field strength... RADIO SERVICES RADIO BROADCAST SERVICES AM Broadcast Stations § 73.189 Minimum antenna heights or field..., frequency, or transmitter location must also request authority to install a new antenna system or to make...
47 CFR 73.189 - Minimum antenna heights or field strength requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 4 2013-10-01 2013-10-01 false Minimum antenna heights or field strength... RADIO SERVICES RADIO BROADCAST SERVICES AM Broadcast Stations § 73.189 Minimum antenna heights or field..., frequency, or transmitter location must also request authority to install a new antenna system or to make...
Stockpile Model of Personal Protective Equipment in Taiwan.
Chen, Yu-Ju; Chiang, Po-Jung; Cheng, Yu-Hsin; Huang, Chun-Wei; Kao, Hui-Yun; Chang, Chih-Kai; Huang, Hsun-Miao; Liu, Pei-Yin; Wang, Jen-Hsin; Chih, Yi-Chien; Chou, Shu-Mei; Yang, Chin-Hui; Chen, Chang-Hsun
The Taiwan Centers for Disease Control (Taiwan CDC) has established a 3-tier personal protective equipment (PPE) stockpiling framework that could maintain a minimum stockpile for the surge demand of PPE in the early stage of a pandemic. However, PPE stockpiling efforts must contend with increasing storage fees and expiration problems. In 2011, the Taiwan CDC initiated a stockpile replacement model in order to optimize the PPE stockpiling efficiency, ensure a minimum stockpile, use the government's limited funds more effectively, and achieve the goal of sustainable management. This stockpile replacement model employs a first-in-first-out principle in which the oldest stock in the central government stockpile is regularly replaced and replenished with the same amount of new and qualified products, ensuring the availability and maintenance of the minimum stockpiles. In addition, a joint electronic procurement platform has been established for merchandising the replaced PPE to local health authorities and medical and other institutions for their routine or epidemic use. In this article, we describe the PPE stockpile model in Taiwan, including the 3-tier stockpiling framework, the operational model, the components of the replacement system, implementation outcomes, epidemic supports, and the challenges and prospects of this model.
Stockpile Model of Personal Protective Equipment in Taiwan
Chen, Yu-Ju; Cheng, Yu-Hsin; Huang, Chun-Wei; Kao, Hui-Yun; Chang, Chih-Kai; Huang, Hsun-Miao; Liu, Pei-Yin; Wang, Jen-Hsin; Chih, Yi-Chien; Chou, Shu-Mei; Yang, Chin-Hui; Chen, Chang-Hsun
2017-01-01
The Taiwan Centers for Disease Control (Taiwan CDC) has established a 3-tier personal protective equipment (PPE) stockpiling framework that could maintain a minimum stockpile for the surge demand of PPE in the early stage of a pandemic. However, PPE stockpiling efforts must contend with increasing storage fees and expiration problems. In 2011, the Taiwan CDC initiated a stockpile replacement model in order to optimize the PPE stockpiling efficiency, ensure a minimum stockpile, use the government's limited funds more effectively, and achieve the goal of sustainable management. This stockpile replacement model employs a first-in-first-out principle in which the oldest stock in the central government stockpile is regularly replaced and replenished with the same amount of new and qualified products, ensuring the availability and maintenance of the minimum stockpiles. In addition, a joint electronic procurement platform has been established for merchandising the replaced PPE to local health authorities and medical and other institutions for their routine or epidemic use. In this article, we describe the PPE stockpile model in Taiwan, including the 3-tier stockpiling framework, the operational model, the components of the replacement system, implementation outcomes, epidemic supports, and the challenges and prospects of this model. PMID:28418743
Military Occupational Speciality Training Cost Handbook (MOSB)
1983-10-01
FINANCE & ACCOUNTING CENTER "JUN 1 i 184’, l APPROVED:_ . A " W. M. ALLENi T - DIRECTOR OF COST ANALYSIS _ "OFFICE OF THE COMPTROLLER OF THE ARMYj 84 04 16 ...COVERED j14. DATE OF REPORT (Yr.. Alo.. Day) 15 AE COUNT 16 . SUPPLEMENTARY NOTAOMION IFROM TO 83/10 43o Supersedes Volumes I and II, MOSB, dated 81... depreciation of equipment, minimum consumption of utilities, pay of minimum grounds staff, etc. Of course, per capita fixed cost will rise with a decreasing
Scientific Lightning Detection Network for Kazakhstan
NASA Astrophysics Data System (ADS)
Streltsov, A. V.; Lozbin, A.; Inchin, A.; Shpadi, Y.; Inchin, P.; Shpadi, M.; Ayazbayev, G.; Bykayev, R.; Mailibayeva, L.
2015-12-01
In the frame of grant financing of the scientific research in 2015-2017 the project "To Develop Electromagnetic System for lightning location and atmosphere-lithosphere coupling research" was found. The project was start in January, 2015 and should be done during 3 years. The purpose is to create a system of electromagnetic measurements for lightning location and atmosphere-lithosphere coupling research consisting of a network of electric and magnetic sensors and the dedicated complex for data processing and transfer to the end user. The main tasks are to set several points for electromagnetic measurements with 100-200 km distance between them, to develop equipment for these points, to develop the techniques and software for lightning location (Time-of-arrival and Direction Finding (TOA+DF)) and provide a lightning activity research in North Tien-Shan region with respect to seismicity and other natural and manmade activities. Also, it is planned to use lightning data for Global Electric Circuit (GEC) investigation. Currently, there are lightning detection networks in many countries. In Kazakhstan we have only separate units in airports. So, we don't have full lightning information for our region. It is planned, to setup 8-10 measurement points with magnetic and electric filed antennas for VLF range. The final data set should be including each stroke location, time, type (CG+, CG-, CC+ or CC-) and waveform from each station. As the magnetic field lightning antenna the ferrite rod VLF antenna will be used. As the electric field antenna the wide range antenna with specific frequencies filters will be used. For true event detection TOA and DF methods needs detected stroke from minimum 4 stations. In this case we can get location accuracy about 2-3 km and better.
30 CFR 250.806 - Safety and pollution prevention equipment quality assurance requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Safety and pollution prevention equipment... Gas Production Safety Systems § 250.806 Safety and pollution prevention equipment quality assurance... install only certified safety and pollution prevention equipment (SPPE) in wells located on the OCS. SPPE...
46 CFR 151.02-1 - Conditions under which equivalents may be used.
Code of Federal Regulations, 2010 CFR
2010-10-01
... where it is shown to the satisfaction of the Commandant that the use of any particular equipment... conditions as will insure, to his satisfaction, a degree of safety consistent with the minimum standards set...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-03
.... Section 15.240 requires each grantee of certification for Radio Frequency Identification (RFID) Equipment... location, the FCC identification number(s) of the equipment. The improved RFID equipment could benefit...
47 CFR 64.1401 - Expanded interconnection.
Code of Federal Regulations, 2014 CFR
2014-10-01
... own equipment needed to terminate basic transmission facilities, including optical terminating... such equipment to connect interconnectors' fiber optic systems or microwave radio transmission..., including optical terminating equipment and multiplexers, to be located within or upon the local exchange...
47 CFR 64.1401 - Expanded interconnection.
Code of Federal Regulations, 2013 CFR
2013-10-01
... own equipment needed to terminate basic transmission facilities, including optical terminating... such equipment to connect interconnectors' fiber optic systems or microwave radio transmission..., including optical terminating equipment and multiplexers, to be located within or upon the local exchange...
47 CFR 64.1401 - Expanded interconnection.
Code of Federal Regulations, 2012 CFR
2012-10-01
... own equipment needed to terminate basic transmission facilities, including optical terminating... such equipment to connect interconnectors' fiber optic systems or microwave radio transmission..., including optical terminating equipment and multiplexers, to be located within or upon the local exchange...
Space processes for extended low-G testing
NASA Technical Reports Server (NTRS)
Steurer, W. H.; Kaye, S.; Gorham, D. J.
1973-01-01
Results of an investigation of verifying the capabilities of space processes in ground based experiments at low-g periods are presented. Limited time experiments were conducted with the processes. A valid representation of the complete process cycle was achieved at low-g periods ranging from 40 to 390 seconds. A minimum equipment inventory, is defined. A modular equipment design, adopted to assure low cost and high program flexibility, is presented as well as procedures and data established for the synthesis and definition of dedicated and mixed rocket payloads.
Eckstein, Felix; Boudreau, Robert; Wang, Zhijie; Hannon, Michael J; Duryea, Jeff; Wirth, Wolfgang; Cotofana, Sebastian; Guermazi, Ali; Roemer, Frank; Nevitt, Michael; John, Markus R; Ladel, Christoph; Sharma, Leena; Hunter, David J; Kwoh, C Kent
2016-06-01
To evaluate whether change in fixed-location measures of radiographic joint space width (JSW) and cartilage thickness by MRI predict knee replacement. Knees replaced between 36 and 60 months' follow-up in the Osteoarthritis Initiative were each matched with one control by age, sex and radiographic status. Radiographic JSW was determined from fixed flexion radiographs and subregional femorotibial cartilage thickness from 3 T MRI. Changes between the annual visit before replacement (T0) and 2 years before T0 (T-2) were compared using conditional logistic regression. One hundred and nineteen knees from 102 participants (55.5 % women; age 64.2 ± 8.7 [mean ± SD] years) were studied. Fixed-location JSW change at 22.5 % from medial to lateral differed more between replaced and control knees (case-control [cc] OR = 1.57; 95 % CI: 1.23-2.01) than minimum medial JSW change (ccOR = 1.38; 95 % CI: 1.11-1.71). Medial femorotibial cartilage loss displayed discrimination similar to minimum JSW, and central tibial cartilage loss similar to fixed-location JSW. Location-independent thinning and thickening scores were elevated prior to knee replacement. Discrimination of structural progression between knee pre-placement cases versus controls was stronger for fixed-location than minimum radiographic JSW. MRI displayed similar discrimination to radiography and suggested greater simultaneous cartilage thickening and loss prior to knee replacement. • Fixed-location JSW predicts surgical knee replacement more strongly than minimum JSW. • MRI predicts knee replacement with similar accuracy to radiographic JSW. • MRI reveals greater cartilage thinning and thickening prior to knee replacement.
Emergency medical equipment storage: benefits of visual cues tested in field and simulated settings.
Grundgeiger, Tobias; Harris, Bonnie; Ford, Nicholas; Abbey, Michael; Sanderson, Penelope M; Venkatesh, Balasubramanian
2014-08-01
We tested the effectiveness of an illustrated divider ("the divider") for bedside emergency equipment drawers in an intensive care unit (ICU). In Study I, we assessed whether the divider increases completeness and standardizes the locations of emergency equipment within the drawer. In Study 2, we investigated whether the divider decreases nurses' restocking and retrieval times and decreases their workload. Easy access to fully stocked emergency equipment is important during emergencies. However, inefficient equipment storage and cognitively demanding work settings might mean that drawers are incompletely stocked and access to items is slow. A pre-post-post study investigated drawer completeness and item locations before and after the introduction of the divider to 30 ICU drawers. A subsequent experiment measured item restocking time, item retrieval time, and subjective workload for nurses. At 2 weeks and 10 weeks after the divider was introduced, the completeness of the drawer increased significantly compared with before the divider was introduced. The divider decreased the variability of the locations of the 17 items in the drawer to 16% of its original value. Study 2 showed that restocking times but not retrieval times were significantly faster with the divider present For both tasks, nurses rated their workload lower with the divider. The divider improved the standardization and completeness of emergency equipment. In addition, restocking times and workload were decreased with the divider. Redesigning storage for certain equipment using human factors design principles can help to speed and standardize restocking and ease access to equipment.
Long, Elliot; Fitzpatrick, Patrick; Cincotta, Domenic R; Grindlay, Joanne; Barrett, Michael Joseph
2016-01-27
Safety of emergency intubation may be improved by standardising equipment preparation; the efficacy of cognitive aids is unknown. This randomised controlled trial compared no cognitive aid (control) with the use of a checklist or picture template for emergency airway equipment preparation in the Emergency Department of The Royal Children's Hospital, Melbourne. Sixty-three participants were recruited, 21 randomised to each group. Equal numbers of nursing, junior medical, and senior medical staff were included in each group. Compared to controls, the checklist or template group had significantly lower equipment omission rates (median 30% IQR 20-40% control, median 10% IQR 5-10 % checklist, median 10% IQR 5-20% template; p < 0.05). The combined omission rate and sizing error rate was lower using a checklist or template (median 35 % IQR 30-45 % control, median 15% IQR 10-20% checklist, median 15% IQR 10-30% template; p < 0.05). The template group had less variation in equipment location compared to checklist or controls. There was no significant difference in preparation time in controls (mean 3 min 14 s sd 56 s) compared to checklist (mean 3 min 46 s sd 1 min 15 s) or template (mean 3 min 6 s sd 49 s; p = 0.06). Template use reduces variation in airway equipment location during preparation foremergency intubation, with an equivalent reduction in equipment omission rate to the use of a checklist. The use of a template for equipment preparation and a checklist for team, patient, and monitoring preparation may provide the best combination of both cognitive aids. The use of a cognitive aid for emergency airway equipment preparation reduces errors of omission. Template utilisation reduces variation in equipment location. Australian and New Zealand Trials Registry (ACTRN12615000541505).
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-03
...-AA26 Vessel and Facility Response Plans for Oil: 2003 Removal Equipment Requirements and Alternative... a final rule entitled ``Vessel and Facility Response Plans for Oil: 2003 Removal Equipment... responders for each vessel or facility with appropriate equipment and resources located in each zone of...
7 CFR 1779.65 - Lender's sale or assignment of the guaranteed portion of loan.
Code of Federal Regulations, 2011 CFR
2011-01-01
... construction, and acquisition of real estate and equipment without the prior written approval of the Agency. If... operating procedures. (c) Minimum retention. The lender is required to hold in its own portfolio or retain a...
Code of Federal Regulations, 2014 CFR
2014-04-01
... program. All factors that comprise the State transportation department's (STD) determination of the... which are performed in the STD's central laboratory would not be covered by an independent assurance... STD. As a minimum, the qualification program shall include provisions for checking test equipment and...
Code of Federal Regulations, 2012 CFR
2012-04-01
... program. All factors that comprise the State transportation department's (STD) determination of the... which are performed in the STD's central laboratory would not be covered by an independent assurance... STD. As a minimum, the qualification program shall include provisions for checking test equipment and...
Code of Federal Regulations, 2013 CFR
2013-04-01
... program. All factors that comprise the State transportation department's (STD) determination of the... which are performed in the STD's central laboratory would not be covered by an independent assurance... STD. As a minimum, the qualification program shall include provisions for checking test equipment and...
Code of Federal Regulations, 2011 CFR
2011-04-01
... program. All factors that comprise the State transportation department's (STD) determination of the... which are performed in the STD's central laboratory would not be covered by an independent assurance... STD. As a minimum, the qualification program shall include provisions for checking test equipment and...
Code of Federal Regulations, 2014 CFR
2014-01-01
... or income for minimum essential family living needs, and items such as equipment, tools, and motor... products. Farmer Program loans. These loans and Farm Ownership (FO), Operating (OL), Soil and Water (SW..., including crops, livestock, poultry products, Agricultural Stabilization and Conservation Service payments...
Code of Federal Regulations, 2013 CFR
2013-01-01
... or income for minimum essential family living needs, and items such as equipment, tools, and motor... products. Farmer Program loans. These loans and Farm Ownership (FO), Operating (OL), Soil and Water (SW..., including crops, livestock, poultry products, Agricultural Stabilization and Conservation Service payments...
Code of Federal Regulations, 2012 CFR
2012-01-01
... or income for minimum essential family living needs, and items such as equipment, tools, and motor... products. Farmer Program loans. These loans and Farm Ownership (FO), Operating (OL), Soil and Water (SW..., including crops, livestock, poultry products, Agricultural Stabilization and Conservation Service payments...
Code of Federal Regulations, 2011 CFR
2011-01-01
... or income for minimum essential family living needs, and items such as equipment, tools, and motor... products. Farmer Program loans. These loans and Farm Ownership (FO), Operating (OL), Soil and Water (SW..., including crops, livestock, poultry products, Agricultural Stabilization and Conservation Service payments...
DOT National Transportation Integrated Search
2012-03-01
The Federal Motor Vehicle Safety Standards (FMVSS) establish minimum levels for vehicle safety, and manufacturers of motor vehicle and equipment items must comply with these standards. The National Highway Traffic Safety Administration (NHTSA) contra...
25 CFR 542.8 - What are the minimum internal control standards for pull tabs?
Code of Federal Regulations, 2011 CFR
2011-04-01
... microchip reader, the reader shall be tested periodically to determine that it is correctly reading the bar code or microchip. (iii) If the electronic equipment returns a voucher or a payment slip to the player...
Guidelines for the specification of blue safety flags in railroad operations
DOT National Transportation Integrated Search
2010-12-01
Blue flag protection in the railroad industry provides safety to workers from the inadvertent movement of equipment on which they : are working. Current Federal regulations provide minimum specifications for the devices that can be used as blue flags...
43. View of CSMR room equipment locator and system checkout ...
43. View of CSMR room equipment locator and system checkout console for detection radars and rearward communication data links in transmitter building no. 102. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK
NASA Astrophysics Data System (ADS)
Romanovich, A. A.; Romanovich, L. G.; Chekhovskoy, E. I.
2018-03-01
The article presents the results of experimental studies on the grinding process of a clinker preliminarily ground in press roller mills in a ball mill equipped with energy exchange devices. The authors studied the influence of the coefficients of loading for grinding bodies of the first and second mill chambers, their lengths, angles of inclination, and the mutual location of energy exchange devices (the ellipse segment and the double-acting blade) on the output parameters of the grinding process (productivity, drive power consumption and specific energy consumption). It is clarified that the best results of the disaggregation and grinding process, judging by the minimum specific energy consumption in the grinding of clinker with an anisotropic texture after force deformation between the rolls of a press roller shredder, are achieved at a certain angle of ellipse segment inclination; the length of the first chamber and the coefficients of loading the chambers with grinding bodies.
NASA Technical Reports Server (NTRS)
1974-01-01
The capabilities for preflight feeding of flight personnel and the supply and control of the space shuttle flight food system were investigated to determine ground support requirements; and the functional details of an onboard food system galley are shown in photographic mockups. The elements which were identified as necessary to the efficient accomplishment of ground support functions include the following: (1) administration; (2) dietetics; (3) analytical laboratories; (4) flight food warehouse; (5) stowage module assembly area; (6) launch site module storage area; (7) alert crew restaurant and disperse crew galleys; (8) ground food warehouse; (9) manufacturing facilities; (10) transport; and (11) computer support. Each element is discussed according to the design criteria of minimum cost, maximum flexibility, reliability, and efficiency consistent with space shuttle requirements. The galley mockup overview illustrates the initial operation configuration, food stowage locations, meal assembly and serving trays, meal preparation configuration, serving, trash management, and the logistics of handling and cleanup equipment.
Improving indoor air quality and thermal comfort in office building by using combination filters
NASA Astrophysics Data System (ADS)
Kabrein, H.; Yusof, M. Z. M.; Hariri, A.; Leman, A. M.; Afandi, A.
2017-09-01
Poor indoor air quality and thermal comfort condition in the workspace affected the occupants’ health and work productivity, especially when adapting the recirculation of air in heating ventilation and air-conditioning (HVAC) system. The recirculation of air was implemented in this study by mixing the circulated returned indoor air with the outdoor fresh air. The aims of this study are to assess the indoor thermal comfort and indoor air quality (IAQ) in the office buildings, equipped with combination filters. The air filtration technique consisting minimum efficiency reporting value (MERV) filter and activated carbon fiber (ACF) filter, located before the fan coil units. The findings of the study show that the technique of mixing recirculation air with the fresh air through the combination filters met the recommended thermal comfort condition in the workspace. Furthermore, the result of the post-occupancy evaluation (POE) and the environmental measurements comply with the ASHRAE 55 standard. In addition, the level of CO2 concentration continued to decrease during the period of the measurement.
Carel, R S
1982-04-01
The cost-effectiveness of a computerized ECG interpretation system in an ambulatory health care organization has been evaluated in comparison with a conventional (manual) system. The automated system was shown to be more cost-effective at a minimum load of 2,500 patients/month. At larger monthly loads an even greater cost-effectiveness was found, the average cost/ECG being about $2. In the manual system the cost/unit is practically independent of patient load. This is primarily due to the fact that 87% of the cost/ECG is attributable to wages and fees of highly trained personnel. In the automated system, on the other hand, the cost/ECG is heavily dependent on examinee load. This is due to the relatively large impact of equipment depreciation on fixed (and total) cost. Utilization of a computer-assisted system leads to marked reduction in cardiologists' interpretation time, substantially shorter turnaround time (of unconfirmed reports), and potential provision of simultaneous service at several remotely located "heart stations."
NASA Astrophysics Data System (ADS)
Wallace, Jay R.
1989-03-01
This paper deals with the application of infrared imaging radiometry as a diagnostic inspection tool for locating a concealed leak in the refrigeration system supplying glycol coolant to the arena floor of an ice skating rink in a municipal coliseum facility. Scanning approximately 10 miles of black iron tubing embedded in the arena floor resulted in locating a leak within the supply/return side of the system. A secondary disclosure was a restriction to normal coolant flow in some delivery loops caused by sludge build-up. Specific inspection procedures were established to enhance temperature differentials suitable for good thermal imaging. One procedure utilized the temperature and pressure of the city water supply; a second the availability of 130F hot water from the facility's boiler system; and a third the building's own internal ambient temperature. Destructive testing and other data collection equipment confirmed the thermographic findings revealing a section of corrosion damaged pipe. Repair and flushing of the system was quickly completed with a minimum of construction costs and inconvenience. No financial losses were incurred due to the interruption of scheduled revenue events. Probable cause for the shutdown condition was attributed to a flawed installation decision made 15 years earlier during the initial construction stage.
Dynamic tests on the NASA Langley CSI evolutionary model
NASA Technical Reports Server (NTRS)
Troidl, H.; Elliott, K. B.
1993-01-01
A modal analysis study, representing one of the anticipated 'Cooperative Spacecraft Structural Dynamics Experiments on the NASA Langley CSI Evolutionary Model', was carried out as a sub-task under the NASA/DLR collaboration in dynamics and control of large space systems. The CSI evolutionary testbed (CEM) is designed for the development of Controls-Structures Interaction (CSI) technology to improve space science platform pointing. For orbiting space structures like large flexible trusses, new identification challenges arise due to their specific dynamic characteristics (low frequencies and high modal density) on the one hand, and the limited possibilities of exciting such structures and measuring their responses on orbit on the other. The main objective was to investigate the modal identification potential of several different types of forcing functions that could possibly be realized with on-board excitation equipment using a minimum number of exciter locations as well as response locations. These locations were defined in an analytical test prediction process used to study the implications of measuring and analyzing the responses thus produced. It turned out that broadband excitation is needed for a general modal survey, but if only certain modes are of particular interest, combinations of exponentially decaying sine functions provide favorable excitation conditions as they allow to concentrate the available energy on the modes being of special interest. From a practical point-of-view structural nonlinearities as well as noisy measurements make the analysis more difficult, especially in the low frequency range and when the modes are closely spaced.
Addai, Emmanuel Kwasi; Gabel, Dieter; Krause, Ulrich
2016-04-15
The risks associated with dust explosions still exist in industries that either process or handle combustible dust. This explosion risk could be prevented or mitigated by applying the principle of inherent safety (moderation). This is achieved by adding an inert material to a highly combustible material in order to decrease the ignition sensitivity of the combustible dust. The presented paper deals with the experimental investigation of the influence of adding an inert dust on the minimum ignition energy and the minimum ignition temperature of the combustible/inert dust mixtures. The experimental investigation was done in two laboratory scale equipment: the Hartmann apparatus and the Godbert-Greenwald furnace for the minimum ignition energy and the minimum ignition temperature test respectively. This was achieved by mixing various amounts of three inert materials (magnesium oxide, ammonium sulphate and sand) and six combustible dusts (brown coal, lycopodium, toner, niacin, corn starch and high density polyethylene). Generally, increasing the inert materials concentration increases the minimum ignition energy as well as the minimum ignition temperatures until a threshold is reached where no ignition was obtained. The permissible range for the inert mixture to minimize the ignition risk lies between 60 to 80%. Copyright © 2016 Elsevier B.V. All rights reserved.
75 FR 25127 - Operations Specifications
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-07
... information on those who are to respond, including by using appropriate automated, electronic, mechanical, or... total quantity of hydraulic fluid. Flag operation means any scheduled operation conducted by any person... aircraft equipment, and less the operating load (consisting of minimum flightcrew, foods and beverages, and...
Code of Federal Regulations, 2014 CFR
2014-01-01
... providing training in a flight simulation training device, have received training and evaluation within the... motion limitations of simulation; (D) Minimum equipment requirements for each curriculum; and (E) The maneuvers that will be demonstrated in the flight simulation training device. (b) An applicant for a pilot...
25 CFR 547.1 - What is the purpose of this part?
Code of Federal Regulations, 2011 CFR
2011-04-01
... STANDARDS FOR GAMING EQUIPMENT USED WITH THE PLAY OF CLASS II GAMES § 547.1 What is the purpose of this part... other technologic aids in connection with the play of Class II games. This part establishes the minimum...
25 CFR 547.1 - What is the purpose of this part?
Code of Federal Regulations, 2010 CFR
2010-04-01
... STANDARDS FOR GAMING EQUIPMENT USED WITH THE PLAY OF CLASS II GAMES § 547.1 What is the purpose of this part... other technologic aids in connection with the play of Class II games. This part establishes the minimum...
25 CFR 547.1 - What is the purpose of this part?
Code of Federal Regulations, 2012 CFR
2012-04-01
... STANDARDS FOR GAMING EQUIPMENT USED WITH THE PLAY OF CLASS II GAMES § 547.1 What is the purpose of this part... other technologic aids in connection with the play of Class II games. This part establishes the minimum...
30 CFR 18.24 - Electrical clearances.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Electrical clearances. 18.24 Section 18.24... APPROVAL OF MINING PRODUCTS ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT AND ACCESSORIES Construction and Design Requirements § 18.24 Electrical clearances. Minimum clearances between uninsulated electrical conductor...
30 CFR 18.24 - Electrical clearances.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Electrical clearances. 18.24 Section 18.24... APPROVAL OF MINING PRODUCTS ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT AND ACCESSORIES Construction and Design Requirements § 18.24 Electrical clearances. Minimum clearances between uninsulated electrical conductor...
30 CFR 18.24 - Electrical clearances.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Electrical clearances. 18.24 Section 18.24... APPROVAL OF MINING PRODUCTS ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT AND ACCESSORIES Construction and Design Requirements § 18.24 Electrical clearances. Minimum clearances between uninsulated electrical conductor...
29 CFR 1926.954 - Grounding for protection of employees.
Code of Federal Regulations, 2012 CFR
2012-07-01
... the new lines or equipment. (c) Communication conductors. Bare wire communication conductors on power... have a resistance to ground low enough to remove the danger of harm to personnel or permit prompt... shall have a minimum conductance of No. 2 AWG copper. ...
29 CFR 1926.954 - Grounding for protection of employees.
Code of Federal Regulations, 2011 CFR
2011-07-01
... the new lines or equipment. (c) Communication conductors. Bare wire communication conductors on power... have a resistance to ground low enough to remove the danger of harm to personnel or permit prompt... shall have a minimum conductance of No. 2 AWG copper. ...
29 CFR 1926.954 - Grounding for protection of employees.
Code of Federal Regulations, 2013 CFR
2013-07-01
... the new lines or equipment. (c) Communication conductors. Bare wire communication conductors on power... have a resistance to ground low enough to remove the danger of harm to personnel or permit prompt... shall have a minimum conductance of No. 2 AWG copper. ...
29 CFR 1926.954 - Grounding for protection of employees.
Code of Federal Regulations, 2010 CFR
2010-07-01
... the new lines or equipment. (c) Communication conductors. Bare wire communication conductors on power... have a resistance to ground low enough to remove the danger of harm to personnel or permit prompt... shall have a minimum conductance of No. 2 AWG copper. ...
29 CFR 1926.954 - Grounding for protection of employees.
Code of Federal Regulations, 2014 CFR
2014-07-01
... the new lines or equipment. (c) Communication conductors. Bare wire communication conductors on power... have a resistance to ground low enough to remove the danger of harm to personnel or permit prompt... shall have a minimum conductance of No. 2 AWG copper. ...
Development of Army High-Energy Fuel for Diesel/Turbine-Powered Surface Equipment. Phase II
1981-12-01
preparation. The same extracting procedure used with methylene chloride was then used with pen- tans. A 3.0-percent loss in weight was noted, and a residue...minimum time to reach the target, and minimum weight . Since small missiles, such as the cruise, are volume-limited, it is imperative that the fuel contains...tetrahydrodicyclopentadiene (C1 0 R1 6 ) Molecular Weight 136.2 C:H Ratio 0.62 r Specific Gravity @ 15.60C (60*F) 0.94 Heating Value, Btu/gal. 142,000
Research on configuration of railway self-equipped tanker based on minimum cost maximum flow model
NASA Astrophysics Data System (ADS)
Yang, Yuefang; Gan, Chunhui; Shen, Tingting
2017-05-01
In the study of the configuration of the tanker of chemical logistics park, the minimum cost maximum flow model is adopted. Firstly, the transport capacity of the park loading and unloading area and the transportation demand of the dangerous goods are taken as the constraint condition of the model; then the transport arc capacity, the transport arc flow and the transport arc edge weight are determined in the transportation network diagram; finally, the software calculations. The calculation results show that the configuration issue of the tankers can be effectively solved by the minimum cost maximum flow model, which has theoretical and practical application value for tanker management of railway transportation of dangerous goods in the chemical logistics park.
32 CFR Appendix A to Part 223 - Procedures for Identifying and Controlling DoD UCNI
Code of Federal Regulations, 2010 CFR
2010-07-01
... security measures, including security plans, procedures, and equipment, for the physical protection of DoD... sabotage of DoD SNM, equipment, or facilities (e.g., relative importance of a facility or the location... equipment, for the physical protection of DoD SNM, equipment, or facilities. c. Meet the adverse effects...
Structure for identifying, locating and quantifying physical phenomena
Richardson, John G.
2006-10-24
A method and system for detecting, locating and quantifying a physical phenomena such as strain or a deformation in a structure. A minimum resolvable distance along the structure is selected and a quantity of laterally adjacent conductors is determined. Each conductor includes a plurality of segments coupled in series which define the minimum resolvable distance along the structure. When a deformation occurs, changes in the defined energy transmission characteristics along each conductor are compared to determine which segment contains the deformation.
Richardson, John G.
2006-01-24
A method and system for detecting, locating and quantifying a physical phenomena such as strain or a deformation in a structure. A minimum resolvable distance along the structure is selected and a quantity of laterally adjacent conductors is determined. Each conductor includes a plurality of segments coupled in series which define the minimum resolvable distance along the structure. When a deformation occurs, changes in the defined energy transmission characteristics along each conductor are compared to determine which segment contains the deformation.
29 CFR 1926.407 - Hazardous (classified) locations.
Code of Federal Regulations, 2014 CFR
2014-07-01
... marking requirement for specific equipment: (A) Equipment of the non-heat-producing type (such as junction boxes, conduit, and fitting) and equipment of the heat-producing type having a maximum temperature of... connections, conductor insulation, flexible cords, sealing and drainage, transformers, capacitors, switches...
29 CFR 1926.407 - Hazardous (classified) locations.
Code of Federal Regulations, 2011 CFR
2011-07-01
... marking requirement for specific equipment: (A) Equipment of the non-heat-producing type (such as junction boxes, conduit, and fitting) and equipment of the heat-producing type having a maximum temperature of... connections, conductor insulation, flexible cords, sealing and drainage, transformers, capacitors, switches...
29 CFR 1926.407 - Hazardous (classified) locations.
Code of Federal Regulations, 2010 CFR
2010-07-01
... marking requirement for specific equipment: (A) Equipment of the non-heat-producing type (such as junction boxes, conduit, and fitting) and equipment of the heat-producing type having a maximum temperature of... connections, conductor insulation, flexible cords, sealing and drainage, transformers, capacitors, switches...
40 CFR 86.1437 - Test run-manufacturer.
Code of Federal Regulations, 2010 CFR
2010-07-01
... pipes. Exhaust gas concentrations from vehicle engines equipped with multiple exhaust pipes must be... apply. (1) Exhaust gas sampling algorithm. The analysis of exhaust gas concentrations begins ten seconds after the applicable test mode begins. Exhaust gas concentrations must be analyzed at a minimum rate of...
DOT National Transportation Integrated Search
2016-11-01
The goal of this project was to collect the knowledge needed for the FDOT to either confirm or : improve the adequacy of the FDOTs existing minimum standards for lightning/surge protection, : including devices used and installation procedures. The...
ERIC Educational Resources Information Center
Missouri Univ., Columbia. Agricultural Experiment Station.
This training manual provides information needed to meet minimum EPA standards for certification as a commercial applicator of pesticides in the seed treatment category. The text discusses pests commonly associated with seeds; seed treatment pesticides; labels; chemicals and seed treatment equipment; requirements of federal and state seed laws;…
Use of ground-penetrating radar for detecting voids underneath a jointed concrete pavement.
DOT National Transportation Integrated Search
1986-01-01
A survey of a jointed, reinforced concrete pavement with groundpenetrating radar indicated that the equipment provides a nondestructive inspection technique that can be used at a minimum rate of 5 lane miles of pavement per hour and with only minimal...
10 CFR 600.131 - Insurance coverage.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Nonprofit Organizations Post-Award Requirements § 600.131 Insurance coverage. Recipients shall, at a minimum, provide the equivalent insurance coverage for real property and equipment acquired with DOE funds as provided to property owned by the recipient. Federally-owned property need not be insured unless required...
10 CFR 600.131 - Insurance coverage.
Code of Federal Regulations, 2014 CFR
2014-01-01
... Nonprofit Organizations Post-Award Requirements § 600.131 Insurance coverage. Recipients shall, at a minimum, provide the equivalent insurance coverage for real property and equipment acquired with DOE funds as provided to property owned by the recipient. Federally-owned property need not be insured unless required...
10 CFR 600.131 - Insurance coverage.
Code of Federal Regulations, 2012 CFR
2012-01-01
... Nonprofit Organizations Post-Award Requirements § 600.131 Insurance coverage. Recipients shall, at a minimum, provide the equivalent insurance coverage for real property and equipment acquired with DOE funds as provided to property owned by the recipient. Federally-owned property need not be insured unless required...
47 CFR 15.31 - Measurement standards.
Code of Federal Regulations, 2011 CFR
2011-10-01
... separate enclosures connected by wire or cable. If the individual devices in a composite system are subject... the installation site, such as perimeter protection systems, carrier current systems, and systems... equipment authorization shall be performed at a minimum of three installations that can be demonstrated to...
9 CFR 318.304 - Operations in the thermal processing area.
Code of Federal Regulations, 2013 CFR
2013-01-01
... factor over the specified thermal processing operation times. Temperature/time recording devices shall... minimum initial temperatures and operating procedures for thermal processing equipment, shall be posted in... available to the thermal processing system operator and the inspector. (b) Process indicators and retort...
9 CFR 318.304 - Operations in the thermal processing area.
Code of Federal Regulations, 2012 CFR
2012-01-01
... factor over the specified thermal processing operation times. Temperature/time recording devices shall... minimum initial temperatures and operating procedures for thermal processing equipment, shall be posted in... available to the thermal processing system operator and the inspector. (b) Process indicators and retort...
9 CFR 318.304 - Operations in the thermal processing area.
Code of Federal Regulations, 2014 CFR
2014-01-01
... factor over the specified thermal processing operation times. Temperature/time recording devices shall... minimum initial temperatures and operating procedures for thermal processing equipment, shall be posted in... available to the thermal processing system operator and the inspector. (b) Process indicators and retort...
9 CFR 318.304 - Operations in the thermal processing area.
Code of Federal Regulations, 2011 CFR
2011-01-01
... factor over the specified thermal processing operation times. Temperature/time recording devices shall... minimum initial temperatures and operating procedures for thermal processing equipment, shall be posted in... available to the thermal processing system operator and the inspector. (b) Process indicators and retort...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 4 2013-10-01 2013-10-01 false Fuel tank. 229.217 Section 229.217 Transportation... TRANSPORTATION RAILROAD LOCOMOTIVE SAFETY STANDARDS Locomotive Crashworthiness Design Requirements § 229.217 Fuel tank. (a) External fuel tanks. Locomotives equipped with external fuel tanks shall, at a minimum...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 4 2011-10-01 2011-10-01 false Fuel tank. 229.217 Section 229.217 Transportation... TRANSPORTATION RAILROAD LOCOMOTIVE SAFETY STANDARDS Locomotive Crashworthiness Design Requirements § 229.217 Fuel tank. (a) External fuel tanks. Locomotives equipped with external fuel tanks shall, at a minimum...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 4 2014-10-01 2014-10-01 false Fuel tank. 229.217 Section 229.217 Transportation... TRANSPORTATION RAILROAD LOCOMOTIVE SAFETY STANDARDS Locomotive Crashworthiness Design Requirements § 229.217 Fuel tank. (a) External fuel tanks. Locomotives equipped with external fuel tanks shall, at a minimum...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 4 2012-10-01 2012-10-01 false Fuel tank. 229.217 Section 229.217 Transportation... TRANSPORTATION RAILROAD LOCOMOTIVE SAFETY STANDARDS Locomotive Crashworthiness Design Requirements § 229.217 Fuel tank. (a) External fuel tanks. Locomotives equipped with external fuel tanks shall, at a minimum...
DOT National Transportation Integrated Search
1971-06-01
The report describes efforts leading to the determination of minimum suitable scan rates for the azimuth and Elevation functions of the microwave Landing Guidance System (LGS) proposed by RTCA SC-117, based on performance requirements of two conventi...
22 CFR 226.31 - Insurance coverage.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 22 Foreign Relations 1 2012-04-01 2012-04-01 false Insurance coverage. 226.31 Section 226.31 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ADMINISTRATION OF ASSISTANCE AWARDS TO U.S. NON... shall, at a minimum, provide the equivalent insurance coverage for real property and equipment acquired...
22 CFR 226.31 - Insurance coverage.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Insurance coverage. 226.31 Section 226.31 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ADMINISTRATION OF ASSISTANCE AWARDS TO U.S. NON... shall, at a minimum, provide the equivalent insurance coverage for real property and equipment acquired...
22 CFR 226.31 - Insurance coverage.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 22 Foreign Relations 1 2014-04-01 2014-04-01 false Insurance coverage. 226.31 Section 226.31 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ADMINISTRATION OF ASSISTANCE AWARDS TO U.S. NON... shall, at a minimum, provide the equivalent insurance coverage for real property and equipment acquired...
22 CFR 226.31 - Insurance coverage.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 22 Foreign Relations 1 2011-04-01 2011-04-01 false Insurance coverage. 226.31 Section 226.31 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ADMINISTRATION OF ASSISTANCE AWARDS TO U.S. NON... shall, at a minimum, provide the equivalent insurance coverage for real property and equipment acquired...
22 CFR 226.31 - Insurance coverage.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 22 Foreign Relations 1 2013-04-01 2013-04-01 false Insurance coverage. 226.31 Section 226.31 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ADMINISTRATION OF ASSISTANCE AWARDS TO U.S. NON... shall, at a minimum, provide the equivalent insurance coverage for real property and equipment acquired...
45 CFR 74.31 - Insurance coverage.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 45 Public Welfare 1 2014-10-01 2014-10-01 false Insurance coverage. 74.31 Section 74.31 Public..., AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Property Standards § 74.31 Insurance coverage. Recipients shall, at a minimum, provide the equivalent insurance coverage for real property and equipment...
45 CFR 74.31 - Insurance coverage.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 45 Public Welfare 1 2010-10-01 2010-10-01 false Insurance coverage. 74.31 Section 74.31 Public..., AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Property Standards § 74.31 Insurance coverage. Recipients shall, at a minimum, provide the equivalent insurance coverage for real property and equipment...
34 CFR 421.3 - What activities may the Secretary fund?
Code of Federal Regulations, 2011 CFR
2011-07-01
... VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION BUSINESS AND EDUCATION STANDARDS PROGRAM General... for projects that organize and operate business-labor-education technical committees that propose... in those divisions or specialty areas; (c) Minimum tools and equipment required in those divisions or...
34 CFR 421.3 - What activities may the Secretary fund?
Code of Federal Regulations, 2010 CFR
2010-07-01
... VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION BUSINESS AND EDUCATION STANDARDS PROGRAM General... for projects that organize and operate business-labor-education technical committees that propose... in those divisions or specialty areas; (c) Minimum tools and equipment required in those divisions or...
Full-scale Wind-tunnel and Flight Tests of a Fairchild 22 Airplane Equipped with a Fowler Flap
NASA Technical Reports Server (NTRS)
Dearborn, C H; Soule, H A
1936-01-01
Full-scale wind-tunnel and flight tests were made of a Fairchild 22 airplane equipped with a Fowler flap to determine the effect of the flap on the performance and control characteristics of the airplane. In the wind-tunnel tests of the airplane with the horizontal tail surfaces removed, the flap was found to increase the maximum lift coefficient from 1.27 to 2.41. In the flight test, the flap was found to decrease the minimum speed from 58.8 to 44.4 miles per hour. The required take-off run to attain an altitude of 50 feet was reduced from 935 feet to 700 feet by the use of the flap, the minimum distance being obtained with five-sixths full deflection. The landing run from a height of 50 feet was reduced one-third. The longitudinal and directional control was adversely affected by the flap, indicating that the design of the tail surfaces is more critical with a flapped than a plain wing.
1980-11-01
hr incineration rate are presented in Table 15. These costs include dredging equipment, flat bed trailer and afterburners and venturi scrubbers where...require further treatment before they can be released into the environment, i.e. biological degradation for the liquid and specific scrubbers for the...The wet-air units are equipped with wet scrubbers to remove air emissions. Air emissions are expected to contain at a minimum CO, C0 2 ,N2 , 0, and
Maintenance of the Hanford cone penetrometer platform during fiscal year 1999
DOE Office of Scientific and Technical Information (OSTI.GOV)
IWATATE, D.F.
This SOW describes services requested of Applied Research and Associates, Inc. (ARA), as a commercial provider of cone penetrometer equipment and services, to provide routine inspection and minimum preventive maintenance on the Hanford CP Platform (CPP) during Fiscal Year 1999. This SOW specifically pertains to the maintenance of the CPP and associated support equipment and is limited in scope to routine preventive maintenance and identification of any deficiencies. ARA is the original manufacturer of the CPP and will conduct this work following the vendor-prepared maintenance schedule.
The international team. [for development, use and operation of space station
NASA Technical Reports Server (NTRS)
Lottmann, R. V.; Wigbels, L. D.; Rice, W. E.
1986-01-01
In view of the limited resources anticipated for the initial stages of the NASA Space Shuttle program, NASA planners have proposed a multinational partnership concept which will attempt to meet user requirements with minimum duplication of facilities and equipment. A major aspect of this concept is that the assignment of functions to as given country's laboratory module only implies that its subsystems will be tailored as necessary to the accommodation of such functions; the outfitting of the laboratory with research equipment will then be shared by all partners.
Current pulse amplifier transmits detector signals with minimum distortion and attenuation
NASA Technical Reports Server (NTRS)
Bush, N. E.
1967-01-01
Amplifier translates the square pulses generated by a boron-trifluoride neutron sensitive detector located adjacent to a nuclear reactor to slower, long exponential decay pulses. These pulses are transmitted over long coaxial cables with minimum distortion and loss of frequency.
46 CFR 199.178 - Marking of stowage locations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Marking of stowage locations. 199.178 Section 199.178... locations. (a) Containers, brackets, racks, and other similar stowage locations for lifesaving equipment... that location. (b) If more than one device is stowed in a location, the number of devices stowed must...
Vanguard/PLACE experiment system design and test plan
NASA Technical Reports Server (NTRS)
Taylor, R. E.
1973-01-01
The design, development, and testing of the NASA-GFSC Position Location and Aircraft Communications Equipment (PLACE) at C band frequency are discussed. The equipment was installed on the USNS Vanguard. The tests involved a sea test to evalute the position-location, 2-way voice, and 2-way data communications capability of PLACE and a trilateration test to position-fix the ATS-5 satellite using the PLACE system.
30 CFR 75.1002 - Installation of electric equipment and conductors; permissibility.
Code of Federal Regulations, 2010 CFR
2010-07-01
... conductors; permissibility. 75.1002 Section 75.1002 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... Wires and Trolley Feeder Wires § 75.1002 Installation of electric equipment and conductors... equipment is located within 150 feet of pillar workings or longwall faces. (b) Electric conductors and...
30 CFR 75.1002 - Installation of electric equipment and conductors; permissibility.
Code of Federal Regulations, 2011 CFR
2011-07-01
... conductors; permissibility. 75.1002 Section 75.1002 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... Wires and Trolley Feeder Wires § 75.1002 Installation of electric equipment and conductors... equipment is located within 150 feet of pillar workings or longwall faces. (b) Electric conductors and...
40 CFR 270.25 - Specific part B information requirements for equipment.
Code of Federal Regulations, 2010 CFR
2010-07-01
... requirements for equipment. 270.25 Section 270.25 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... subpart BB of part 264 applies: (1) Equipment identification number and hazardous waste management unit identification. (2) Approximate locations within the facility (e.g., identify the hazardous waste management unit...
Moisture content of wood for interior use...Douglas-fir and robusta eucalyptus samples studied
R. Sidney Boone
1967-01-01
Panels of Douglas-fir and robusta eucalyptus blocks showed little seasonal variation in Equilibrium Moisture Content (EMC) of wood at 19 indoor locations on Oahu, Hawaii. Differences in EMC between locations were more variable. Minimum EMC at nonair-conditioned locations was 10 percent;at air-conditioned locations. 8 percent. Maximum EMC at nonairconditioned locations...
49 CFR 192.365 - Service lines: Location of valves.
Code of Federal Regulations, 2010 CFR
2010-10-01
... NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Customer Meters, Service Regulators... accessible location that, if feasible, is outside of the building. (c) Underground valves. Each underground...
14 CFR 135.336 - Airline transport pilot certification training program.
Code of Federal Regulations, 2014 CFR
2014-01-01
... (v) Evaluation. (4) If providing training in a flight simulation training device, holds an aircraft type rating for the aircraft represented by the flight simulation training device utilized in the... simulation; (iv) Minimum equipment requirements for each curriculum; and (v) The maneuvers that will be...
Program Improvement Project for Industrial Education. Annual Report.
ERIC Educational Resources Information Center
Shaeffer, Bruce W.
Designed to improve industrial education programs through the development of minimum uniform quality standards, a project developed a task list, educationally sequenced the identified tasks, and developed a recommended shop layout and equipment list for four occupational areas: diesel repair, appliance repair, office machine repair, and small…
Apply Pesticides Correctly: A Guide for Commercial Applicators.
ERIC Educational Resources Information Center
Environmental Protection Agency, Washington, DC.
This document provides practical information needed by commercial pesticide applicators to meet the minimum Federal regulation requirements for the use of various pesticides. The text and accompanying illustrations cover the seven major topics of pests, pest control, pesticides, labels and labeling, using pesticides safely, application equipment,…
Stoneflies and Campers: Teaching Campers about Aquatic Environments.
ERIC Educational Resources Information Center
Edelstein, Karen
1994-01-01
Summer camps can implement a biomonitoring program that determines water quality through study of aquatic insects. Such a program requires a minimum of equipment and allows campers to explore the natural world and absorb information that will affect their views of science and the environment. (LP)
7 CFR 58.406 - Starter facility.
Code of Federal Regulations, 2010 CFR
2010-01-01
... precaution shall be taken to prevent contamination of the facility, equipment and the air therein. A filtered air supply with a minimum average efficiency of 90 percent when tested in accordance with the ASHRAE....406 Starter facility. A separate starter room or properly designed starter tanks and satisfactory air...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 38-MOTOR EQUIPMENT MANAGEMENT 38.8-Standard Form 149, U.S. Government National Credit Card § 109-38... the administrative control of fleet credit cards. Administrative control shall include, as a minimum: (1) A reconciliation of on-hand credit cards with the inventory list provided by GSA, (2) Providing...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-16
... consumer protection, the Agency issued GLP regulations. The regulations specify minimum standards for the proper conduct of safety testing and contain sections on facilities, personnel, equipment, standard operating procedures (SOPs), test and control articles, quality assurance, protocol and conduct of a safety...
36 CFR 1120.52 - Computerized records.
Code of Federal Regulations, 2010 CFR
2010-07-01
... organizations and upon the particular types of computer and associated equipment and the amounts of time on such... from the computer which permits copying the printout, the material will be made available at the per... information from computerized records frequently involves a minimum computer time cost of approximately $100...
36 CFR 1120.52 - Computerized records.
Code of Federal Regulations, 2011 CFR
2011-07-01
... organizations and upon the particular types of computer and associated equipment and the amounts of time on such... from the computer which permits copying the printout, the material will be made available at the per... information from computerized records frequently involves a minimum computer time cost of approximately $100...
Code of Federal Regulations, 2014 CFR
2014-01-01
... 38-MOTOR EQUIPMENT MANAGEMENT 38.8-Standard Form 149, U.S. Government National Credit Card § 109-38... the administrative control of fleet credit cards. Administrative control shall include, as a minimum: (1) A reconciliation of on-hand credit cards with the inventory list provided by GSA, (2) Providing...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 38-MOTOR EQUIPMENT MANAGEMENT 38.8-Standard Form 149, U.S. Government National Credit Card § 109-38... the administrative control of fleet credit cards. Administrative control shall include, as a minimum: (1) A reconciliation of on-hand credit cards with the inventory list provided by GSA, (2) Providing...
Code of Federal Regulations, 2012 CFR
2012-01-01
... 38-MOTOR EQUIPMENT MANAGEMENT 38.8-Standard Form 149, U.S. Government National Credit Card § 109-38... the administrative control of fleet credit cards. Administrative control shall include, as a minimum: (1) A reconciliation of on-hand credit cards with the inventory list provided by GSA, (2) Providing...
Commercial Pesticides Applicator Manual: Agriculture - Plant.
ERIC Educational Resources Information Center
Fitzwater, W. D.; And Others
This training manual provides information needed to meet the minimum EPA standards for certification as a commercial applicator of pesticides in the agriculture-plant pest control category. The text discusses identification and control of insects, diseases, nematodes, and weeds of agricultural crops. Proper use of application equipment and safety…
40 CFR 60.743 - Compliance provisions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 130 Mg per year of VOC), each owner or operator of affected coating mix preparation equipment shall... place. Such activities shall be carried out through ports of the minimum practical size; (ii) Cover... or port for addition of ingredients) shall be covered consistent with paragraphs (c)(1) (i), (ii...
40 CFR 60.743 - Compliance provisions.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 130 Mg per year of VOC), each owner or operator of affected coating mix preparation equipment shall... place. Such activities shall be carried out through ports of the minimum practical size; (ii) Cover... or port for addition of ingredients) shall be covered consistent with paragraphs (c)(1) (i), (ii...
10 CFR 600.131 - Insurance coverage.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 4 2013-01-01 2013-01-01 false Insurance coverage. 600.131 Section 600.131 Energy... Nonprofit Organizations Post-Award Requirements § 600.131 Insurance coverage. Recipients shall, at a minimum, provide the equivalent insurance coverage for real property and equipment acquired with DOE funds as...
2 CFR 215.31 - Insurance coverage.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 2 Grants and Agreements 1 2011-01-01 2011-01-01 false Insurance coverage. 215.31 Section 215.31... A-110) Post Award Requirements Property Standards § 215.31 Insurance coverage. Recipients shall, at a minimum, provide the equivalent insurance coverage for real property and equipment acquired with...
46 CFR 28.210 - First aid equipment and training.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 1 2010-10-01 2010-10-01 false First aid equipment and training. 28.210 Section 28.210....210 First aid equipment and training. (a) Each vessel must have on board a complete first aid manual... location. (b) First aid and cardiopulmonary resuscitation (CPR) course certification. Certification in...
Alternative Fuels Data Center: Active Transit
: Active Transit on AddThis.com... More in this section... Idle Reduction Parts & Equipment Maintenance Reduction Parts & Equipment Maintenance Driving Behavior Fleet Rightsizing System Efficiency Locate
30 CFR 77.1109 - Quantity and location of firefighting equipment.
Code of Federal Regulations, 2010 CFR
2010-07-01
... construction. (c)(1) Mobile equipment, including trucks, front-end loaders, bulldozers, portable welding units...) Fire extinguishers shall be provided at permanent electrical installations commensurate with the...
46 CFR 76.33-10 - Location and spacing of accumulators.
Code of Federal Regulations, 2012 CFR
2012-10-01
... PROTECTION EQUIPMENT Smoke Detecting System, Details § 76.33-10 Location and spacing of accumulators. (a) Smoke accumulators shall be located overhead in each compartment. Where liable to physical damage, the...
46 CFR 76.33-10 - Location and spacing of accumulators.
Code of Federal Regulations, 2014 CFR
2014-10-01
... PROTECTION EQUIPMENT Smoke Detecting System, Details § 76.33-10 Location and spacing of accumulators. (a) Smoke accumulators shall be located overhead in each compartment. Where liable to physical damage, the...
46 CFR 76.33-10 - Location and spacing of accumulators.
Code of Federal Regulations, 2013 CFR
2013-10-01
... PROTECTION EQUIPMENT Smoke Detecting System, Details § 76.33-10 Location and spacing of accumulators. (a) Smoke accumulators shall be located overhead in each compartment. Where liable to physical damage, the...
46 CFR 76.33-10 - Location and spacing of accumulators.
Code of Federal Regulations, 2010 CFR
2010-10-01
... PROTECTION EQUIPMENT Smoke Detecting System, Details § 76.33-10 Location and spacing of accumulators. (a) Smoke accumulators shall be located overhead in each compartment. Where liable to physical damage, the...
46 CFR 76.33-10 - Location and spacing of accumulators.
Code of Federal Regulations, 2011 CFR
2011-10-01
... PROTECTION EQUIPMENT Smoke Detecting System, Details § 76.33-10 Location and spacing of accumulators. (a) Smoke accumulators shall be located overhead in each compartment. Where liable to physical damage, the...
Availability of difficult airway equipment to rural anaesthetists in Queensland, Australia.
Eley, Victoria; Lloyd, Ben; Scott, Justin; Greenland, Keith
2008-01-01
Since 1990 several airway devices have become available to assist in difficult intubation. Multiple surveys have assessed difficult airway equipment availability in international anaesthetic departments and emergency departments. The practice of GP anaesthetists is unique in both its multidisciplinary nature and geographical isolation. General practitioners performing general anaesthesia in rural and remote Queensland, Australia were surveyed to assess their access to difficult airway equipment and whether this was related to the remoteness of their location or attendance at continuing professional development activities. survey. proceduralists performing general anaesthesia in hospitals categorised as Rural, Remote and Metropolitan Area (RRMA) classification 4 to 7 inclusive were surveyed. data collected included demographic information, availability of airway management equipment, and attendance at continuing professional development activities. The received data was entered into a Microsoft Excel spreadsheet and analysed in Statistical Package for Social Sciences (SPSS Inc; Chicago, IL, USA) using the frequencies and crosstabs functions. The Fisher's exact test was used. A p-value of less than 0.10 was considered noteworthy and a p-value of less than 0.05 was considered to be significant. A statistical comparison was made between the known demographics of the target population and the survey responders. The known demographics were derived from the Health Workforce Queensland database and included age, gender, practice location and practitioner type. Seventy-nine surveys were distributed and 35 returned (response rate 44%). This represented 21 hospitals. There was no statistical difference between the target population and the survey responders in terms of age and gender. There was no statistical difference in terms of practice location, although the small percentage responding from RRMA 6 was notable. There was a statistically significant difference between the groups in terms of practitioner type. Hospital-based practitioners were relatively under-represented in the responder group. Eighty-two per cent of practitioners felt they had access to appropriate equipment and this was not significantly related the remoteness of their location. There was wide variation in available equipment. Simple adjuncts such as the bougie and stylet were not universally available but cricothyroidotomy sets were more common. Practitioners in the more remote locations were less likely to have attended an educational activity such as conference, workshop or skills laboratory (p=0.05). We suggest standardisation of difficult airway equipment for rural practitioners. This could be supported by increased availability of airway management workshops in remote areas. Such an intervention would be in line with other initiatives to standardise medical equipment in rural and remote Queensland hospitals. Familiarity with infrequently used equipment may assist practitioners and their locums. Standardisation of equipment and practice is a recognised method of improving patient safety.
Working group on the “adequate minimum” V=volcanic observatory
Tilling, R.I.
1982-01-01
A working group consisting of R. I. Tilling (United States, Chairman), M. Espendola (Mexico), E. Malavassi (Costa Rica), L. Villari (Italy), and J.P Viode (France) met on the island of Guadeloupe on February 20, 1981, to discuss informally the requirements for a "Minimum" volcano observatory, one which would have the essential monitoring equipment and staff to provide reliable information on the state of an active volcno. Given the premise that any monitoring of a volcano is better than none at all, the owrking group then proceeded to consider the concept of an "adequate minimum" observatory.
46 CFR 108.175 - Contiguous locations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Contiguous locations. 108.175 Section 108.175 Shipping... EQUIPMENT Construction and Arrangement Classified Locations § 108.175 Contiguous locations. An enclosed space that has direct access to a Division 1 or Division 2 location is the same division as that...
40 CFR 721.1450 - 1,3-Benzenediamine, 4-(1,1-di-methylethyl)-ar-methyl.
Code of Federal Regulations, 2012 CFR
2012-07-01
... washings, equipment washouts, and stormwater runoffs, wastewater treatment in permitted industrial... a Material Safety Data Sheet (“MSDS”) which includes, at a minimum, the language specified in... scientifically valid toxicity test data required under that order, developed according to EPA's Good Laboratory...
40 CFR 721.1450 - 1,3-Benzenediamine, 4-(1,1-di-methylethyl)-ar-methyl.
Code of Federal Regulations, 2011 CFR
2011-07-01
... washings, equipment washouts, and stormwater runoffs, wastewater treatment in permitted industrial... a Material Safety Data Sheet (“MSDS”) which includes, at a minimum, the language specified in... scientifically valid toxicity test data required under that order, developed according to EPA's Good Laboratory...
40 CFR 721.1450 - 1,3-Benzenediamine, 4-(1,1-di-methylethyl)-ar-methyl.
Code of Federal Regulations, 2013 CFR
2013-07-01
... washings, equipment washouts, and stormwater runoffs, wastewater treatment in permitted industrial... a Material Safety Data Sheet (“MSDS”) which includes, at a minimum, the language specified in... scientifically valid toxicity test data required under that order, developed according to EPA's Good Laboratory...
40 CFR 721.1450 - 1,3-Benzenediamine, 4-(1,1-di-methylethyl)-ar-methyl.
Code of Federal Regulations, 2014 CFR
2014-07-01
... washings, equipment washouts, and stormwater runoffs, wastewater treatment in permitted industrial... a Material Safety Data Sheet (“MSDS”) which includes, at a minimum, the language specified in... scientifically valid toxicity test data required under that order, developed according to EPA's Good Laboratory...
46 CFR 176.204 - Permit to carry excursion party.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., survival craft, life jacket, fire safety, and manning standards applicable to a vessel in the service for... may carry, the crew required, any additional lifesaving or safety equipment required, the route for... waive the applicable minimum safety standards when issuing an excursion permit. In particular, a vessel...
46 CFR 115.204 - Permit to carry excursion party.
Code of Federal Regulations, 2010 CFR
2010-10-01
... jacket, fire safety, and manning standards applicable to a vessel in the service for which the excursion... crew required, any additional lifesaving or safety equipment required, the route for which the permit... applicable minimum safety standards when issuing an excursion permit. In particular, a vessel that is being...
46 CFR 176.204 - Permit to carry excursion party.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., survival craft, life jacket, fire safety, and manning standards applicable to a vessel in the service for... may carry, the crew required, any additional lifesaving or safety equipment required, the route for... waive the applicable minimum safety standards when issuing an excursion permit. In particular, a vessel...
46 CFR 115.204 - Permit to carry excursion party.
Code of Federal Regulations, 2012 CFR
2012-10-01
... jacket, fire safety, and manning standards applicable to a vessel in the service for which the excursion... crew required, any additional lifesaving or safety equipment required, the route for which the permit... applicable minimum safety standards when issuing an excursion permit. In particular, a vessel that is being...
46 CFR 176.204 - Permit to carry excursion party.
Code of Federal Regulations, 2012 CFR
2012-10-01
..., survival craft, life jacket, fire safety, and manning standards applicable to a vessel in the service for... may carry, the crew required, any additional lifesaving or safety equipment required, the route for... waive the applicable minimum safety standards when issuing an excursion permit. In particular, a vessel...
46 CFR 115.204 - Permit to carry excursion party.
Code of Federal Regulations, 2011 CFR
2011-10-01
... jacket, fire safety, and manning standards applicable to a vessel in the service for which the excursion... crew required, any additional lifesaving or safety equipment required, the route for which the permit... applicable minimum safety standards when issuing an excursion permit. In particular, a vessel that is being...
46 CFR 154.408 - Cargo tank external pressure load.
Code of Federal Regulations, 2010 CFR
2010-10-01
... minimum internal pressure (maximum vacuum), and the maximum external pressure to which any portion of the... 46 Shipping 5 2010-10-01 2010-10-01 false Cargo tank external pressure load. 154.408 Section 154... Equipment Cargo Containment Systems § 154.408 Cargo tank external pressure load. For the calculation...
This fact sheet summarizes how buildings connected to a CHP- equipped district energy system can earn more LEED® points than they could otherwise earn. It presents guidance for meeting the LEED® Minimum Energy Performance prerequisite and calculating point
49 CFR 225.25 - Recordkeeping.
Code of Federal Regulations, 2012 CFR
2012-10-01
... number; (3) Full name of railroad employee; (4) Date of birth of railroad employee; (5) Gender of..., explosions, acts of God, or other events involving the operation of railroad on-track equipment, signals... operation for a minimum of 90 calendar days. If the establishment has not been in continual operation for a...
49 CFR 225.25 - Recordkeeping.
Code of Federal Regulations, 2011 CFR
2011-10-01
... number; (3) Full name of railroad employee; (4) Date of birth of railroad employee; (5) Gender of..., explosions, acts of God, or other events involving the operation of railroad on-track equipment, signals... operation for a minimum of 90 calendar days. If the establishment has not been in continual operation for a...
49 CFR 225.25 - Recordkeeping.
Code of Federal Regulations, 2014 CFR
2014-10-01
... number; (3) Full name of railroad employee; (4) Date of birth of railroad employee; (5) Gender of..., explosions, acts of God, or other events involving the operation of railroad on-track equipment, signals... operation for a minimum of 90 calendar days. If the establishment has not been in continual operation for a...
49 CFR 225.25 - Recordkeeping.
Code of Federal Regulations, 2013 CFR
2013-10-01
... number; (3) Full name of railroad employee; (4) Date of birth of railroad employee; (5) Gender of..., explosions, acts of God, or other events involving the operation of railroad on-track equipment, signals... operation for a minimum of 90 calendar days. If the establishment has not been in continual operation for a...
Code of Federal Regulations, 2010 CFR
2010-10-01
..., approved by the Mine Safety and Health Administration (MSHA) and by the National Institute for Occupational Safety and Health (NIOSH), and have at a minimum a 30-minute air supply and full facepiece. (c... the crew are familiar with the operation of the equipment. (f) Boots and gloves shall be of rubber or...
7 CFR 3201.76 - Asphalt and tar removers.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 15 2014-01-01 2014-01-01 false Asphalt and tar removers. 3201.76 Section 3201.76... Designated Items § 3201.76 Asphalt and tar removers. (a) Definition. Cleaning agents designed to remove asphalt or tar from equipment, roads, or other surfaces. (b) Minimum biobased content. The Federal...
7 CFR 3201.76 - Asphalt and tar removers.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 15 2013-01-01 2013-01-01 false Asphalt and tar removers. 3201.76 Section 3201.76... Designated Items § 3201.76 Asphalt and tar removers. (a) Definition. Cleaning agents designed to remove asphalt or tar from equipment, roads, or other surfaces. (b) Minimum biobased content. The Federal...
30 CFR 56.14215 - Coupling or uncoupling cars.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Coupling or uncoupling cars. 56.14215 Section... Equipment Safety Practices and Operational Procedures § 56.14215 Coupling or uncoupling cars. Prior to coupling or uncoupling cars manually, trains shall be brought to a complete stop, and then moved at minimum...
30 CFR 56.14215 - Coupling or uncoupling cars.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Coupling or uncoupling cars. 56.14215 Section... Equipment Safety Practices and Operational Procedures § 56.14215 Coupling or uncoupling cars. Prior to coupling or uncoupling cars manually, trains shall be brought to a complete stop, and then moved at minimum...
30 CFR 56.14215 - Coupling or uncoupling cars.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Coupling or uncoupling cars. 56.14215 Section... Equipment Safety Practices and Operational Procedures § 56.14215 Coupling or uncoupling cars. Prior to coupling or uncoupling cars manually, trains shall be brought to a complete stop, and then moved at minimum...
30 CFR 56.14215 - Coupling or uncoupling cars.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Coupling or uncoupling cars. 56.14215 Section... Equipment Safety Practices and Operational Procedures § 56.14215 Coupling or uncoupling cars. Prior to coupling or uncoupling cars manually, trains shall be brought to a complete stop, and then moved at minimum...
30 CFR 56.14215 - Coupling or uncoupling cars.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Coupling or uncoupling cars. 56.14215 Section... Equipment Safety Practices and Operational Procedures § 56.14215 Coupling or uncoupling cars. Prior to coupling or uncoupling cars manually, trains shall be brought to a complete stop, and then moved at minimum...
Energy Integrated Lighting-Heating-Cooling System.
ERIC Educational Resources Information Center
Meckler, Gershon; And Others
1964-01-01
Energy balance problems in the design of office buildings are analyzed. Through the use of integrated systems utilizing dual purpose products, a controlled environment with minimum expenditure of energy, equipment and space can be provided. Contents include--(1) office building occupancy loads, (2) office building heating load analysis, (3) office…
49 CFR 192.171 - Compressor stations: Additional safety equipment.
Code of Federal Regulations, 2010 CFR
2010-10-01
... SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Design of... must have adequate fire protection facilities. If fire pumps are a part of these facilities, their... event of inadequate cooling or lubrication of the unit. (d) Each compressor station gas engine that...
40 CFR 799.9420 - TSCA carcinogenicity.
Code of Federal Regulations, 2010 CFR
2010-07-01
... inhalation equipment designed to sustain a minimum air flow of 10 air changes per hr, an adequate oxygen... sufficient. If pretest measurements are not within 10% of each other, three to four measurements should be... methods including significance criteria shall be selected during the design of the study. (2) Evaluation...
40 CFR 799.9420 - TSCA carcinogenicity.
Code of Federal Regulations, 2011 CFR
2011-07-01
... inhalation equipment designed to sustain a minimum air flow of 10 air changes per hr, an adequate oxygen... sufficient. If pretest measurements are not within 10% of each other, three to four measurements should be... methods including significance criteria shall be selected during the design of the study. (2) Evaluation...
40 CFR 799.9420 - TSCA carcinogenicity.
Code of Federal Regulations, 2012 CFR
2012-07-01
... inhalation equipment designed to sustain a minimum air flow of 10 air changes per hr, an adequate oxygen... sufficient. If pretest measurements are not within 10% of each other, three to four measurements should be... methods including significance criteria shall be selected during the design of the study. (2) Evaluation...
40 CFR 799.9430 - TSCA combined chronic toxicity/carcinogenicity.
Code of Federal Regulations, 2010 CFR
2010-07-01
... effects and determine dose-response relationships. The design and conduct should allow for the detection... dynamic inhalation equipment designed to sustain a minimum air flow of 10 air changes per hour, an... measurements during the exposures should be sufficient. If pretest measurements are not within 10% of each...
40 CFR 799.9430 - TSCA combined chronic toxicity/carcinogenicity.
Code of Federal Regulations, 2011 CFR
2011-07-01
... effects and determine dose-response relationships. The design and conduct should allow for the detection... dynamic inhalation equipment designed to sustain a minimum air flow of 10 air changes per hour, an... measurements during the exposures should be sufficient. If pretest measurements are not within 10% of each...
40 CFR 799.9430 - TSCA combined chronic toxicity/carcinogenicity.
Code of Federal Regulations, 2013 CFR
2013-07-01
... effects and determine dose-response relationships. The design and conduct should allow for the detection... dynamic inhalation equipment designed to sustain a minimum air flow of 10 air changes per hour, an... measurements during the exposures should be sufficient. If pretest measurements are not within 10% of each...
40 CFR 799.9420 - TSCA carcinogenicity.
Code of Federal Regulations, 2013 CFR
2013-07-01
... inhalation equipment designed to sustain a minimum air flow of 10 air changes per hr, an adequate oxygen... sufficient. If pretest measurements are not within 10% of each other, three to four measurements should be... methods including significance criteria shall be selected during the design of the study. (2) Evaluation...
40 CFR 799.9420 - TSCA carcinogenicity.
Code of Federal Regulations, 2014 CFR
2014-07-01
... inhalation equipment designed to sustain a minimum air flow of 10 air changes per hr, an adequate oxygen... sufficient. If pretest measurements are not within 10% of each other, three to four measurements should be... methods including significance criteria shall be selected during the design of the study. (2) Evaluation...
40 CFR 799.9430 - TSCA combined chronic toxicity/carcinogenicity.
Code of Federal Regulations, 2012 CFR
2012-07-01
... effects and determine dose-response relationships. The design and conduct should allow for the detection... dynamic inhalation equipment designed to sustain a minimum air flow of 10 air changes per hour, an... measurements during the exposures should be sufficient. If pretest measurements are not within 10% of each...
40 CFR 799.9430 - TSCA combined chronic toxicity/carcinogenicity.
Code of Federal Regulations, 2014 CFR
2014-07-01
... effects and determine dose-response relationships. The design and conduct should allow for the detection... dynamic inhalation equipment designed to sustain a minimum air flow of 10 air changes per hour, an... measurements during the exposures should be sufficient. If pretest measurements are not within 10% of each...
30 CFR 250.616 - Blowout prevention equipment.
Code of Federal Regulations, 2014 CFR
2014-07-01
... pressure rating of the BOP system and system components shall exceed the expected surface pressure to which they may be subjected. If the expected surface pressure exceeds the rated working pressure of the... pressure limitations that will be applied during each mode of pressure control. (b) The minimum BOP system...
30 CFR 250.616 - Blowout prevention equipment.
Code of Federal Regulations, 2013 CFR
2013-07-01
... pressure rating of the BOP system and system components shall exceed the expected surface pressure to which they may be subjected. If the expected surface pressure exceeds the rated working pressure of the... pressure limitations that will be applied during each mode of pressure control. (b) The minimum BOP system...
30 CFR 250.615 - Blowout prevention equipment.
Code of Federal Regulations, 2012 CFR
2012-07-01
... pressure rating of the BOP system and system components shall exceed the expected surface pressure to which they may be subjected. If the expected surface pressure exceeds the rated working pressure of the... pressure limitations that will be applied during each mode of pressure control. (b) The minimum BOP system...
2012-12-01
mineral and organic materials situated beneath an aqueous layer. PEDs assembled, installed, and retrieved following these procedures will be suitable...at a minimum, wearing adequate protective equipment, flotation devices, and making use of lifelines. 8.0 References Massachusetts Institute of
76 FR 6088 - Installed Systems and Equipment for Use by the Flightcrew
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-03
... requirements proposed here with the intent of achieving that balance. General Discussion of the Proposal..., ``General requirements.'' Under that section, the FAA is charged with prescribing regulations and minimum... appropriate balance is needed among them. There have been cases in the past where design characteristics known...
42 CFR 52b.12 - What are the minimum requirements of construction and equipment?
Code of Federal Regulations, 2014 CFR
2014-10-01
...-8400). (3) ICBO “Uniform Building Code,” Volumes 1-3 (1997). International Conference of Building...-4406). (4) BOCA National Building Code (1996) 1998 Supplement, Building Officials and Code... Southern Building Code Congress (SBCC), 900 Montclair Road, Birmingham, AL 35213-1206 (telephone 205-591...
42 CFR 52b.12 - What are the minimum requirements of construction and equipment?
Code of Federal Regulations, 2012 CFR
2012-10-01
...-8400). (3) ICBO “Uniform Building Code,” Volumes 1-3 (1997). International Conference of Building...-4406). (4) BOCA National Building Code (1996) 1998 Supplement, Building Officials and Code... Southern Building Code Congress (SBCC), 900 Montclair Road, Birmingham, AL 35213-1206 (telephone 205-591...
42 CFR 52b.12 - What are the minimum requirements of construction and equipment?
Code of Federal Regulations, 2013 CFR
2013-10-01
...-8400). (3) ICBO “Uniform Building Code,” Volumes 1-3 (1997). International Conference of Building...-4406). (4) BOCA National Building Code (1996) 1998 Supplement, Building Officials and Code... Southern Building Code Congress (SBCC), 900 Montclair Road, Birmingham, AL 35213-1206 (telephone 205-591...
49 CFR 230.85 - Audible warning device.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 4 2011-10-01 2011-10-01 false Audible warning device. 230.85 Section 230.85... Tenders Cabs, Warning Signals, Sanders and Lights § 230.85 Audible warning device. (a) General provisions. Each steam locomotive shall be equipped with an audible warning device that produces a minimum sound...
49 CFR 230.85 - Audible warning device.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 4 2013-10-01 2013-10-01 false Audible warning device. 230.85 Section 230.85... Tenders Cabs, Warning Signals, Sanders and Lights § 230.85 Audible warning device. (a) General provisions. Each steam locomotive shall be equipped with an audible warning device that produces a minimum sound...
49 CFR 230.85 - Audible warning device.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Audible warning device. 230.85 Section 230.85... Tenders Cabs, Warning Signals, Sanders and Lights § 230.85 Audible warning device. (a) General provisions. Each steam locomotive shall be equipped with an audible warning device that produces a minimum sound...
49 CFR 230.85 - Audible warning device.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 4 2012-10-01 2012-10-01 false Audible warning device. 230.85 Section 230.85... Tenders Cabs, Warning Signals, Sanders and Lights § 230.85 Audible warning device. (a) General provisions. Each steam locomotive shall be equipped with an audible warning device that produces a minimum sound...
49 CFR 230.85 - Audible warning device.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 4 2014-10-01 2014-10-01 false Audible warning device. 230.85 Section 230.85... Tenders Cabs, Warning Signals, Sanders and Lights § 230.85 Audible warning device. (a) General provisions. Each steam locomotive shall be equipped with an audible warning device that produces a minimum sound...
10 CFR 431.36 - Compliance Certification.
Code of Federal Regulations, 2014 CFR
2014-01-01
... EQUIPMENT Electric Motors Certification § 431.36 Compliance Certification. (a) General. A manufacturer or private labeler shall not distribute in commerce any basic model of an electric motor which is subject to... efficiency for each basic model of electric motor distributed is not less than the minimum nominal full load...
10 CFR 431.36 - Compliance Certification.
Code of Federal Regulations, 2013 CFR
2013-01-01
... EQUIPMENT Electric Motors Certification § 431.36 Compliance Certification. (a) General. A manufacturer or private labeler shall not distribute in commerce any basic model of an electric motor which is subject to... efficiency for each basic model of electric motor distributed is not less than the minimum nominal full load...
41 CFR 105-72.401 - Insurance coverage.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Insurance coverage. 105... § 105-72.401 Insurance coverage. Recipients shall, at a minimum, provide the equivalent insurance coverage for real property and equipment acquired with Federal funds as provided to property owned by the...
47 CFR 73.685 - Transmitter location and antenna system.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 4 2013-10-01 2013-10-01 false Transmitter location and antenna system. 73.685... RADIO BROADCAST SERVICES Television Broadcast Stations § 73.685 Transmitter location and antenna system... and antenna height above average terrain employed, the following minimum field strength in dB above...
47 CFR 73.685 - Transmitter location and antenna system.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 4 2011-10-01 2011-10-01 false Transmitter location and antenna system. 73.685... RADIO BROADCAST SERVICES Television Broadcast Stations § 73.685 Transmitter location and antenna system... and antenna height above average terrain employed, the following minimum field strength in dB above...
47 CFR 73.685 - Transmitter location and antenna system.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 4 2014-10-01 2014-10-01 false Transmitter location and antenna system. 73.685... RADIO BROADCAST SERVICES Television Broadcast Stations § 73.685 Transmitter location and antenna system... and antenna height above average terrain employed, the following minimum field strength in dB above...
47 CFR 73.685 - Transmitter location and antenna system.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 4 2012-10-01 2012-10-01 false Transmitter location and antenna system. 73.685... RADIO BROADCAST SERVICES Television Broadcast Stations § 73.685 Transmitter location and antenna system... and antenna height above average terrain employed, the following minimum field strength in dB above...
47 CFR 73.685 - Transmitter location and antenna system.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 4 2010-10-01 2010-10-01 false Transmitter location and antenna system. 73.685... RADIO BROADCAST SERVICES Television Broadcast Stations § 73.685 Transmitter location and antenna system... and antenna height above average terrain employed, the following minimum field strength in dB above...
NASA Astrophysics Data System (ADS)
Starostin, A. A.; Shangin, V. V.; Bukhman, V. G.; Volosnikov, D. V.; Skripov, P. V.
2016-08-01
The research is devoted to development of a self-contained device for rapid detection of volatile impurities in the oil system of a turbine and testing it using the operating equipment. The device consists of a remote sensor, whose sensitive element is a 3-5-mm long wire probe 20 microns in diameter, and a measurement unit that comprises a microcontroller with a set of peripherals. The design of the device enables automation of the measurement procedure with a minimum number of preset settings and real-time output of information to the operator console. The software of the device provides two-stage pulse heating of the wire probe and a resistance temperature detector. The two-stage mode proves to be the most sensitive to appearance in the system of moisture, including its trace amounts. The characteristic time of the heating is of the order of 10 ms. The measurement procedure is based on a method that consists in automatic search for spontaneous boiling-up temperature of the oil accompanied by a characteristic response signal. The results were interpreted by formal correlation of the measured values with an array of calibration data obtained in similar experiments with well-defined oil samples. An experimental method for application of the device has been developed that takes into account technological factors, such as comparatively high values of the flow rate and the temperature of the oil in locations of the oil drain from bearings, the variability of these values, and the variety of noise types that accompany the operation of the thermal power equipment that complicate the online measurements. Tests of the device were carried out in locations of oil drain from supporting bearings. The test results have demonstrated the possibility of applying the device directly in the oil system of a turbine and provided a practical basis for development of a system of multipoint control of the technological scheme in real time.
A Green Robotic Observatory for Astronomy Education
NASA Astrophysics Data System (ADS)
Reddy, Vishnu; Archer, K.
2008-09-01
With the development of robotic telescopes and stable remote observing software, it is currently possible for a small institution to have an affordable astronomical facility for astronomy education. However, a faculty member has to deal with the light pollution (observatory location on campus), its nightly operations and regular maintenance apart from his day time teaching and research responsibilities. While building an observatory at a remote location is a solution, the cost of constructing and operating such a facility, not to mention the environmental impact, are beyond the reach of most institutions. In an effort to resolve these issues we have developed a robotic remote observatory that can be operated via the internet from anywhere in the world, has a zero operating carbon footprint and minimum impact on the local environment. The prototype observatory is a clam-shell design that houses an 8-inch telescope with a SBIG ST-10 CCD detector. The brain of the observatory is a low draw 12-volt harsh duty computer that runs the dome, telescope, CCD camera, focuser, and weather monitoring. All equipment runs of a 12-volt AGM-style battery that has low lead content and hence more environmental-friendly to dispose. The total power of 12-14 amp/hrs is generated from a set of solar panels that are large enough to maintain a full battery charge for several cloudy days. This completely eliminates the need for a local power grid for operations. Internet access is accomplished via a high-speed cell phone broadband connection or satellite link eliminating the need for a phone network. An independent observatory monitoring system interfaces with the observatory computer during operation. The observatory converts to a trailer for transportation to the site and is converted to a semi-permanent building without wheels and towing equipment. This ensures minimal disturbance to local environment.
49 CFR 221.17 - Movement of defective equipment.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Movement of defective equipment. 221.17 Section... Marking Devices § 221.17 Movement of defective equipment. (a) Whenever the marking device prescribed in... of the defect, can be placed only at the rear of a train for movement to the next forward location at...
A Guide to Microforms and Microform Retrieval Equipment.
ERIC Educational Resources Information Center
McKay, Mark, Ed.
As used in this handbook, microform retrieval equipment is defined as any device that is used to locate, enlarge, and display microform images or that produces enlarged hard copy from the images. Only equipment widely available in the United States has been included. The first chapter provides information about the most widely and generally used…
29 CFR 1910.306 - Specific purpose equipment and installations.
Code of Federal Regulations, 2010 CFR
2010-07-01
... means required by paragraph (e)(1) of this section. (f) X-Ray equipment. This paragraph applies to X-ray... disconnecting means shall be operable from a location readily accessible from the X-ray control. For equipment... suitable nonmetallic raceways or cable trays; or (C) Wire or cable in suitable metal raceways or metal...
29 CFR 1910.306 - Specific purpose equipment and installations.
Code of Federal Regulations, 2011 CFR
2011-07-01
... means required by paragraph (e)(1) of this section. (f) X-Ray equipment. This paragraph applies to X-ray... disconnecting means shall be operable from a location readily accessible from the X-ray control. For equipment... suitable nonmetallic raceways or cable trays; or (C) Wire or cable in suitable metal raceways or metal...
Commander Lousma works with EEVT experiment and cryogenic tube on aft middeck
1982-03-31
Commander Jack Lousma works with Electrophoresis Equipment Verification Test (EEVT) electrophoresis unit, cryogenic freezer and tube, and stowage locker equipment located on crew compartment middeck aft bulkhead.