Science.gov

Sample records for equipment neri2000-109 final

  1. Failure Forewarning in NPP Equipment NERI2000-109 Final Project Report

    SciTech Connect

    Hively, LM

    2004-03-26

    The objective of this project is forewarning of machine failures in critical equipment at next-generation nuclear power plants (NPP). Test data were provided by two collaborating institutions: Duke Engineering and Services (first project year), and the Pennsylvania State University (Applied Research Laboratory) during the second and third project years. New nonlinear methods were developed and applied successfully to extract forewarning trends from process-indicative, time-serial data for timely, condition-based maintenance. Anticipation of failures in critical equipment at next-generation NPP will improve the scheduling of maintenance activities to minimize safety concerns, unscheduled non-productive downtime, and collateral damage due to unexpected failures. This approach provides significant economic benefit, and is expected to improve public acceptance of nuclear power. The approach is a multi-tiered, model-independent, and data-driven analysis that uses ORNL's novel nonlinear method to extract forewarning of machine failures from appropriate data. The first tier of the analysis provides a robust choice for the process-indicative data. The second tier rejects data of inadequate quality. The third tier removes signal artifacts that would otherwise confound the analysis, while retaining the relevant nonlinear dynamics. The fourth tier converts the artifact-filtered time-serial data into a geometric representation, that is then transformed to a discrete distribution function (DF). This method allows for noisy, finite-length datasets. The fifth tier obtains dissimilarity measures (DM) between the nominal-state DF and subsequent test-state DFs. Forewarning of a machine failure is indicated by several successive occurrences of the DM above a threshold, or by a statistically significant trend in the DM. This paradigm yields robust nonlinear signatures of degradation and its progression, allowing earlier and more accurate detection of the machine failure.

  2. Annual Report for NERI Proposal No.2000-0109 on Forewarning of Failure in Critical Equipment at Next-Generation Nuclear Power Plants

    SciTech Connect

    Hively, LM

    2001-10-10

    This annual report describes the first year's accomplishments under the NERI2000-109 project. We present a model-independent approach to quantify changes in the nonlinear dynamics underlying time-serial data. From time-windowed data sets, we construct discrete distribution functions on the phase space. Condition change between base case and test case distribution functions is assessed by dissimilarity measures via L{sub 1}-distance and {chi}{sup 2} statistic. The discriminating power of these measures is first tested on noiseless model data, and then applied for detecting dynamical change in power from a motor-pump system. We compare the phase-space dissimilarities with traditional linear and nonlinear measures used in the analysis of chaotic systems. We also assess the potential usefulness of the new measures for robust, accurate, and timely forewarning of equipment failure.

  3. Maintainability design of underground-mining equipment. Volume 1. Final technical report. Research report (Final)

    SciTech Connect

    Conway, E.J.; Unger, R.

    1988-09-01

    The objectives of the project were to: (1) determine the extent to which maintainability design concepts and principles have been applied to the design of underground coal mining equipment, (2) try to assess its impact on productivity and personnel safety, and (3) develop maintainability guidelines to enhance the design of new or rebuilt equipment. An equipment design review was completed at ten operational coal mines. The purpose was to identify design approaches and features that enhanced and degraded the maintenance process. Mine management, safety, and maintenance personnel were also interviewed to identify machine specific design problems. Six original equipment manufacturers were visited and the procedures used to enhance the maintainability of their equipment discussed. Volume I of the Final Technical Report presents an overview of procedures and protocol used and a summary of the findings. Volume II includes the maintainability design guide for mobile underground mining equipment.

  4. Precision Measuring Equipment (PME) Individualized Instruction. Final Report.

    ERIC Educational Resources Information Center

    Lewis, William E.; And Others

    Self-paced programed and audiovisual (AV) instructional materials covering portions of the Air Force course, Precision Measuring Equipment (PME) Specialist, were developed, administered, and evaluated as means of assessing the feasibility of individualizing the PME course as part of the Air Force's Advanced Instructional System (AIS). The…

  5. Validation Testing for Automated Solubility Measurement Equipment Final Report

    SciTech Connect

    Lachut, J. S.

    2016-01-11

    Laboratory tests have been completed to test the validity of automated solubility measurement equipment using sodium nitrate and sodium chloride solutions (see test plan WRPS-1404441, “Validation Testing for Automated Solubility Measurement Equipment”). The sodium nitrate solution results were within 2-3% of the reference values, so the experiment is considered successful using the turbidity meter. The sodium chloride test was done by sight, as the turbidity meter did not work well using sodium chloride. For example, the “clear” turbidity reading was 53 FNU at 80 °C, 107 FNU at 55 °C, and 151 FNU at 20 °C. The sodium chloride did not work because it is granular and large; as the solution was stirred, the granules stayed to the outside of the reactor and just above the stir bar level, having little impact on the turbidity meter readings as the meter was aimed at the center of the solution. Also, the turbidity meter depth has an impact. The salt tends to remain near the stir bar level. If the meter is deeper in the slurry, it will read higher turbidity, and if the meter is raised higher in the slurry, it will read lower turbidity (possibly near zero) because it reads the “clear” part of the slurry. The sodium chloride solution results, as measured by sight rather than by turbidity instrument readings, were within 5-6% of the reference values.

  6. Maintainability design of underground mining equipment. Volume 2. Maintainability design guidelines. Research report (Final)

    SciTech Connect

    Conway, E.J.; Unger, R.

    1989-09-01

    The objectives of the project were to: (1) determine the extent to which maintainability design concepts and principles have been applied to the design of underground coal mining equipment, (2) try to assess its impact on productivity and personnel safety, and (3) develop maintainability guidelines to enhance the design of new or rebuilt equipment. An equipment design review was completed at ten operational coal mines. The purpose was to identify design approaches and features that enhanced and degraded the maintenance process. Mine management, safety, and maintenance personnel were also interviewed to identify machine specific design problems. Six original equipment manufacturers were visited and the procedures used to enhance the maintainability of their equipment discussed. Volume I of the Final Technical Report presents an overview of procedures and protocol used and a summary of the findings. Volume II includes the maintainability design guide for mobile underground mining equipment.

  7. Medicare Program; Prior Authorization Process for Certain Durable Medical Equipment, Prosthetics, Orthotics, and Supplies. Final rule.

    PubMed

    2015-12-30

    This final rule establishes a prior authorization program for certain durable medical equipment, prosthetics, orthotics, and supplies (DMEPOS) items that are frequently subject to unnecessary utilization. This rule defines unnecessary utilization and creates a new requirement that claims for certain DMEPOS items must have an associated provisional affirmed prior authorization decision as a condition of payment. This rule also adds the review contractor's decision regarding prior authorization of coverage of DMEPOS items to the list of actions that are not initial determinations and therefore not appealable.

  8. Medicare program; establishing additional Medicare durable medical equipment, prosthetics, orthotics, and supplies (DMEPOS) supplier enrollment safeguards. Final rule.

    PubMed

    2010-08-27

    This final rule will clarify, expand, and add to the existing enrollment requirements that Durable Medical Equipment and Prosthetics, Orthotics, and Supplies (DMEPOS) suppliers must meet to establish and maintain billing privileges in the Medicare program.

  9. A Study of the Vocational Equipment Used in the Secondary Schools of Ohio. Final Report.

    ERIC Educational Resources Information Center

    Torge, Herman

    Based on the feeling that the quality of any vocational program is directly and positively related to the quality of equipment used in the program, a study was undertaken of the vocational equipment used in secondary public schools in Ohio. Five questions were addressed by the study: (1) How does the equipment used in vocational education programs…

  10. DEVELOPMENT AND EVALUATION OF EDUCATIONAL PROGRAMS IN BIO-MEDICAL EQUIPMENT TECHNOLOGY, PHASE I. FINAL REPORT.

    ERIC Educational Resources Information Center

    Technical Education Research Center, Cambridge, MA.

    OFFICIALS OF A REPRESENTATIVE SAMPLE OF HOSPITALS, BIOMEDICAL EQUIPMENT MANUFACTURERS, AND MEDICAL RESEARCH INSTITUTES IN NEW ENGLAND AND THREE MIDDLE ATLANTIC STATES WERE INTERVIEWED TO DETERMINE THE NEED FOR TECHNICIANS TO SERVICE AND MAINTAIN EQUIPMENT FOUND IN HOSPITALS AND BIOMEDICAL RESEARCH INSTITUTIONS. RESPONSES INDICATED A NEED FOR…

  11. Development and Evaluation of Educational Programs in Biomedical Equipment Technology. Final Report.

    ERIC Educational Resources Information Center

    Technical Education Research Center, Cambridge, MA.

    The report describes the Biomedical Equipment Technology project carried out by Technical Education Research Centers between 1967 and 1974. The project developed a curriculum and a program for training biomedical equipment technicians in two-year schools. The report discusses the three phases of the project: development of pilot programs,…

  12. Methodology to estimate nonroad equipment populations by nonattainment areas. Final report

    SciTech Connect

    Not Available

    1991-09-30

    The Clean Air Act Amendments of 1990 require that EPA conduct a study to determine the contribution of nonroad equipment to the emission inventories of selected nonattainment areas. The contribution is determined by the population of nonroad equipment in a given area, the average load factor at which the equipment's engine is used, the average annual hours of use of the equipment, the horsepower of the engine, and the emission factor attributable to the engine. Since a nonattainment area is a conglomeration of counties within a state, or across states, it is necessary to estimate the county level equipment populations. Engine sales data or equipment population data, however, are not available at the county level, but only at the national and state level. Therefore, a methodology that distributes equipment populations from these levels of aggregation to the county level must be developed. The report presents EEA's methodology to estimate equipment populations for the 24 nonattainment areas included in EPA's study. The report also presents national data on load factors, annual usage, and horsepower.

  13. Medicare program; competitive acquisition for certain durable medical equipment, prosthetics, orthotics, and supplies (DMEPOS) and other issues. Final rule.

    PubMed

    2007-04-10

    This final rule establishes competitive bidding programs for certain Medicare Part B covered items of durable medical equipment, prosthetics, orthotics, and supplies (DMEPOS) throughout the United States in accordance with sections 1847(a) and (b) of the Social Security Act. These competitive bidding programs, which will be phased in over several years, utilize bids submitted by DMEPOS suppliers to establish applicable payment amounts under Medicare Part B.

  14. Space shuttle EVA/IVA support equipment requirements study. Volume 1: Final summary report

    NASA Technical Reports Server (NTRS)

    1973-01-01

    A study was conducted to determine the support equipment requirements for space shuttle intravehicular and extravehicular activities. The subjects investigated are; (1) EVA/IVA task identification and analysis,. (2) primary life support system, (3) emergency life support system, (4) pressure suit assembly, (5) restraints, (6) work site provision, (7) emergency internal vehicular emergencies, and (8) vehicular interfaces.

  15. Medicare program; replacement of reasonable charge methodology by fee schedules for parenteral and enteral nutrients, equipment, and supplies. Final rule.

    PubMed

    2001-08-28

    This final rule implements fee schedules for payment of parenteral and enteral nutrition (PEN) items and services furnished under the prosthetic device benefit, defined in section 1861(s)(8) of the Social Security Act. The authority for establishing these fee schedules is provided by the Balanced Budget Act of 1997, which amended the Social Security Act at section 1842(s). Section 1842(s) of the Social Security Act specifies that statewide or other area wide fee schedules may be implemented for the following items and services still subject to the reasonable charge payment methodology: medical supplies; home dialysis supplies and equipment; therapeutic shoes; parenteral and enteral nutrients, equipment, and supplies; electromyogram devices; salivation devices; blood products; and transfusion medicine. This final rule describes changes made to the proposed fee schedule payment methodology for these items and services and provides that the fee schedules for PEN items and services are effective for all covered items and services furnished on or after January 1, 2002. Fee schedules will not be implemented for electromyogram devices and salivation devices at this time since these items are not covered by Medicare. In addition, fee schedules will not be implemented for medical supplies, home dialysis supplies and equipment, therapeutic shoes, blood products, and transfusion medicine at this time since the data required to establish these fee schedules are inadequate.

  16. Oxidation of volatiles in residential wood burning equipment. Final technical report, September 1980-February 1984

    SciTech Connect

    Malte, P.C.; Thornton, M.M.; Kamber, P.D.

    1984-04-01

    The objectives of this project are to measure, through the use of laboratory combustors, those conditions which promote complete combustion of wood volatiles in residential wood burning equipment. The conditions of interest are combustion temperature, residence time, stoichiometry, and air mixing. The project objectives are met through two laboratory approaches: (1) model compound studies: in order to measure the overall rates of oxidative pyrolysis of biomass volatiles, and to determine the types of intermediate organic species which are likely to form as part of this process, model compounds have been reacted in a specialized jet-stirred reactor, which has been developed as part of this research. (2) high-intensity wood combustion: in order to study the clean combustion of wood, that is, to investigate the conceptual design features required for clean burning, and to ascertain the levels and types of pollutant and condensible species which are most difficult to oxidize, a high-intensity, research wood combustor has been developed and examined for the different phases of the wood burning cycle. Although the objectives of the project have been met, it has not been possible, because of support limitations, to thoroughly explore several interesting aspects which have arisen because of this research. For example, a third laboratory system in which wood pyrolysis gas is injected directly into the a well characterized reactor, so that the kinetics and mechanisms of the gas-phase reaction of the actual biomass volatiles can be studied, could not be thoroughly developed. Refinements in the high-intensity wood combustor, which would bring its design features closer to practicality for the industry, could not be considered. 32 references, 37 figures, 10 tables.

  17. TRICARE program; clarification of benefit coverage of durable equipment and ordering or prescribing durable equipment; clarification of benefit coverage of assistive technology devises under the Extended Care Health Option Program. Final rule.

    PubMed

    2014-12-31

    This final rule modifies the TRICARE regulation to add a definition of assistive technology (AT) devices for purposes of benefit coverage under the TRICARE Extended Care Health Option (ECHO) Program and to amend the definitions of durable equipment (DE) and durable medical equipment (DME) to better conform the language in the regulation to the statute. The final rule amends the language that specifically limits ordering or prescribing of DME to only a physician under the Basic Program, as this amendment will allow certain other TRICARE authorized individual professional providers, acting within the scope of their licensure, to order or prescribe DME. This final rule also incorporates a policy clarification relating to luxury, deluxe, or immaterial features of equipment or devices. That is, TRICARE cannot reimburse for the luxury, deluxe, or immaterial features of equipment or devices, but can reimburse for the base or basic equipment or device that meet the beneficiary's needs. Beneficiaries may choose to pay the provider for the luxury, deluxe, or immaterial features if they desire their equipment or device to have these "extra features."

  18. Medicare program; end-stage renal disease prospective payment system and quality incentive program; ambulance fee schedule; durable medical equipment; and competitive acquisition of certain durable medical equipment prosthetics, orthotics and supplies. Final rule.

    PubMed

    2011-11-10

    This final rule updates and makes certain revisions to the End-Stage Renal Disease (ESRD) prospective payment system (PPS) for calendar year (CY) 2012. We are also finalizing the interim final rule with comment period published on April 6, 2011, regarding the transition budget-neutrality adjustment under the ESRD PPS,. This final rule also sets forth requirements for the ESRD quality incentive program (QIP) for payment years (PYs) 2013 and 2014. In addition, this final rule revises the ambulance fee schedule regulations to conform to statutory changes. This final rule also revises the definition of durable medical equipment (DME) by adding a 3-year minimum lifetime requirement (MLR) that must be met by an item or device in order to be considered durable for the purpose of classifying the item under the Medicare benefit category for DME. Finally, this final rule implements certain provisions of section 154 of the Medicare Improvements for Patients and Providers Act of 2008 (MIPPA) related to the durable medical equipment, prosthetics, orthotics and supplies (DMEPOS) Competitive Acquisition Program and responds to comments received on an interim final rule published January 16, 2009, that implemented these provisions of MIPPA effective April 18, 2009. (See the Table of Contents for a listing of the specific issues addressed in this final rule.)

  19. Automobile or Other Conveyance and Adaptive Equipment Certificate of Eligibility for Veterans or Members of the Armed Forces With Amyotrophic Lateral Sclerosis Connected to Military Service. Final rule.

    PubMed

    2016-01-13

    The Department of Veterans Affairs (VA) published an Interim Final Rule on February 25, 2015, to amend its adjudication regulations to provide a certificate of eligibility for financial assistance in the purchase of an automobile or other conveyance and adaptive equipment for all veterans with service-connected amyotrophic lateral sclerosis (ALS) and servicemembers serving on active duty with ALS. The amendment authorized automatic issuance of a certificate of eligibility for financial assistance in the purchase of an automobile or other conveyance and adaptive equipment to all veterans with service-connected ALS and members of the Armed Forces serving on active duty with ALS. The intent of this final rule is to confirm the amendment made by the interim final rule without change.

  20. A Statewide Study Designed to Determine Methods of Reducing Injury in Interscholastic Football Competition by Equipment Modification. Final Report.

    ERIC Educational Resources Information Center

    Callahan, William T.; And Others

    Through an examination of data on injuries to the lower extremities of varsity high school players, this study sought to ascertain 1) whether modified cleats brought about a reduction in the number and/or severity of such injuries; and 2) whether there existed an optimum combination of equipment for reduction in the number and/or severity of such…

  1. Civilian Health and Medical Program of the Department of Veterans Affairs (CHAMPVA): preauthorization of durable medical equipment. Final rule.

    PubMed

    2009-07-01

    This document amends the Department of Veterans Affairs (VA) medical regulations for the Civilian Health and Medical Program of the Department of Veterans Affairs (CHAMPVA) preauthorization section by increasing the dollar ceiling for purchase or rental of durable medical equipment (DME) from $300 to $2,000.

  2. Blade Testing Equipment Development and Commercialization: Cooperative Research and Development Final Report, CRADA Number CRD-09-346

    SciTech Connect

    Snowberg, D.; Hughes, S.

    2013-04-01

    Blade testing is required to meet wind turbine design standards, reduce machine cost, and reduce the technical and financial risk of deploying mass-produced wind turbine models. NREL?s National Wind Technology Center (NWTC) in Colorado is the only blade test facility in the U.S. capable of performing full-scale static and fatigue testing of multi-megawatt-scale wind turbine blades. Rapid growth in wind turbine size over the past two decades has outstripped the size capacity of the NWTC blade test facility leaving the U.S. wind industry without a suitable means of testing blades for large land-based and offshore turbines. This CRADA will develop and commercialize testing technologies and test equipment, including scaling up, value engineering, and testing of equipment to be used at blade testing facilities in the U.S. and around the world.

  3. Face haulage equipment failure analysis. Volume I. Technical information and conclusions. Final technical report as of November 30, 1980

    SciTech Connect

    Patterson, W.N.; Orona, F.

    1980-11-01

    Face haulage equipment used in conjunction with continuous miners (shuttle cars, diesel haulers, battery scoops, and bridge conveyors) was investigated by recording section delay reports for computer analysis to determine the effect of haulage equipment failures and downtime on productivity, pinpoint the causes of machine failures and downtime, and develop the possible design and operational changes required to reduce machine failures and downtime and increase section productivity. For the mobile vehicle type of haulage (shuttle car, diesel hauler, and battery scoop) failure of one unit in multiple unit haulage operations would not normally stop section production. Bridge conveyors as a haulage system provide continuous haulage of section production but when any part of the bridge system fails, the section production is stopped. In the course of this program, it was determined through the use of daily section shift reports on 200 machines that face haulage equipment is responsible for about 40 to 56 minutes of lost section production time per shift. The most prevalent failure for shuttle cars was found to be the trailing cable umbilical. Bridge conveyors had the most trouble with the conveyor subsystem. Discussions of these and other recorded failures are developed with possible solutions outlined for future implementation. This report only covers the face haulage element of the continuous miner system. Companion reports were developed for the continuous miner and roof bolter elements under separate task orders.

  4. Medicare program; revisions to the durable medical equipment, prosthetics, orthotics, and supplies (DMEPOS) supplier safeguards. Final rule.

    PubMed

    2012-03-14

    This final rule removes the definition of "direct solicitation'' and allows DMEPOS suppliers, including DMEPOS competitive bidding program contract suppliers, to contract with licensed agents to provide DMEPOS supplies, unless prohibited by State law. It also removes the requirement for compliance with local zoning laws and modifies certain State licensure requirement exceptions.

  5. Solar Resources Measurements in Houston, TX -- Equipment Only: Cooperative Research and Development Final Report, CRADA Number CRD-06-204

    SciTech Connect

    Stoffel, T.

    2012-09-01

    Loaning Texas Southern University equipment in order to perform site-specific, long-term, continuous, and high-resolution measurements of solar irradiance is important for developing renewable resource data. These data are used for several research and development activities consistent with the NREL mission: (1) establish a national 30-year climatological database of measured solar irradiances; (2) provide high quality ground-truth data for satellite remote sensing validation; (3) support development of radiative transfer models for estimating solar irradiance from available meteorological observations; (4) provide solar resource information needed for technology deployment and operations. Data acquired under this agreement will be available to the public through NREL's Measurement & Instrumentation Data Center - MIDC (http://www.nrel.gov/midc) Or the Renewable Resource Data Center - RReDC (http://rredc.nrel.gov). The MIDC offers a variety of standard data display, access, and analysis tools designed to address the needs of a wide user audience (e.g., industry, academia, and government interests).

  6. Field Demonstration of Active Desiccant Modules Designed to Integrate with Standard Unitary Rooftop Package Equipment - Final Report: Phase 3

    SciTech Connect

    Fischer, J

    2004-03-15

    This report summarizes the investigation of two active desiccant module (ADM) pilot site installations initiated in 2001. Both pilot installations were retrofits at existing facilities served by conventional heating, ventilating, and air-conditioning (HVAC) systems that had encountered frequent humidity control, indoor air quality (IAQ), and other operational problems. Each installation involved combining a SEMCO, Inc., ADM (as described in Fischer and Sand 2002) with a standard packaged rooftop unit built by the Trane Company. A direct digital control (DDC) system integral to the ADM performed the dual function of controlling the ADM/rooftop combination and facilitating data collection, trending, and remote performance monitoring. The first installation involved providing preconditioned outdoor air to replace air exhausted from the large kitchen hood and bathrooms of a Hooters restaurant located in Rome, Georgia. This facility had previously added an additional rooftop unit in an attempt to achieve occupant comfort without success. The second involved conditioning the outdoor air delivered to each room of a wing of the Mountain Creek Inn at the Callaway Gardens resort. This hotel, designed in the ''motor lodge'' format with each room opening to the outdoors, is located in southwest Georgia. Controlling the space humidity always presented a serious challenge. Uncomfortable conditions and musty odors had caused many guests to request to move to other areas within the resort. This is the first field demonstration performed by Oak Ridge National Laboratory where significant energy savings, operating cost savings, and dramatically improved indoor environmental conditions can all be claimed as the results of a retrofit desiccant equipment field installation. The ADM/rooftop combination installed at the restaurant resulted in a reduction of about 34% in the electricity used by the building's air-conditioning system. This represents a reduction of approximately 15% in

  7. Medicare program; End-Stage Renal Disease prospective payment system, quality incentive program, and Durable Medical Equipment, Prosthetics, Orthotics, and Supplies. Final rule.

    PubMed

    2014-11-06

    This final rule will update and make revisions to the End-Stage Renal Disease (ESRD) prospective payment system (PPS) for calendar year (CY) 2015. This rule also finalizes requirements for the ESRD quality incentive program (QIP), including for payment years (PYs) 2017 and 2018. This rule will also make a technical correction to remove outdated terms and definitions. In addition, this final rule sets forth the methodology for adjusting Durable Medical Equipment, Prosthetics, Orthotics, and Supplies (DMEPOS) fee schedule payment amounts using information from the Medicare DMEPOS Competitive Bidding Program (CBP); makes alternative payment rules for certain DME under the Medicare DMEPOS CBP; clarifies the statutory Medicare hearing aid coverage exclusion and specifies devices not subject to the hearing aid exclusion; will not update the definition of minimal self-adjustment; clarifies the Change of Ownership (CHOW) and provides for an exception to the current requirements; revises the appeal provisions for termination of a CBP contract, including the beneficiary notification requirement under the Medicare DMEPOS CBP, and makes a technical change to the regulation related to the conditions for awarding contracts for furnishing infusion drugs under the Medicare DMEPOS CBP.

  8. Study of the effects of accidentally released carbon/graphite fibers on electric power equipment. Program final report, June 5, 1978-June 5, 1980

    SciTech Connect

    Mauser, S.F.; Bankoske, J.W.; Cooper, J.H.; Davies, D.G.; Eichler, C.H.; Hileman, A.R.; Mousseau, T.E. Jr.; Rackliffe, G.B.

    1980-06-05

    The program to study the effect of accidentally released carbon fibers on electrical power equipment consisted of determining the vulnerability of system outage rates to carbon fiber contamination, and performing tests to quantitize the contamination required to cause flashover of external insulation. Part One of this final report describes an assessment of the vulnerability of power systems to accidentally released fibers from a composite burn. The assessment describes the effect of carbon fibers on individual component failure rates and discusses the effect the change in component failure rates has on the power system reliability. Part Two describes in detail testing performed to determine the vulnerability of external insulation to carbon fiber contamination. Testing consisted of airborne contamination tests on distribution insulators, limited tests on suspension insulators which are commonly used for transmission class voltages, and various tests to quantify the influence of fiber length, voltage stress, etc. on flashover characteristics. The data obtained and analysis performed during this project show that the change of system reliability due to an accidental release from burned carbon fiber composite is negligible.

  9. Special surveillance list of chemicals, products, materials and equipment used in the clandestine production of controlled substances or listed chemicals. Drug Enforcement Administration (DEA), Justice. Final notice.

    PubMed

    1999-05-13

    On October 3, 1996, the Comprehensive Methamphetamine Control Act of 1996 (MCA) was signed into law. The MCA makes it unlawful for any person to distribute a laboratory supply to a person who uses, or attempts to use, that laboratory supply to manufacture a controlled substance or a listed chemical, with reckless disregard for the illegal uses to which such laboratory supply will be put. Individuals who violate this provision are subject to a civil penalty of not more than $25,000; businesses which violate this provision are subject to a civil penalty of not more than $250,000. The term "laboratory supply" is defined as "a listed chemical or any chemical, substance, or item on a special surveillance list published by the Attorney General, which contains chemicals, products, materials, or equipment used in the manufacture of controlled substances and listed chemicals." This final notice contains the list of "laboratory supplies" which constitutes the Special Surveillance List that was required to be published by the Attorney General pursuant to Title 21, United States Code, Section 842(a).

  10. Biodiesel Emissions Testing with a Modern Diesel Engine - Equipment Only: Cooperative Research and Development Final Report, CRADA Number CRD-10-399

    SciTech Connect

    Williams, A.

    2013-06-01

    To evaluate the emissions and performance impact of biodiesel in a modern diesel engine equipped with a diesel particulate filter. This testing is in support of the Non-Petroleum Based Fuels (NPBF) 2010 Annual Operating Plan (AOP).

  11. ENVIRONMENTAL TECHNOLOGY VERIFICATION COATINGS AND COATING EQUIPMENT PROGRAM (ETV CCEP), FINAL TECHNOLOGY APPLICATIONS GROUP TAGNITE--TESTING AND QUALITY ASSURANCE PLAN (T/QAP)

    EPA Science Inventory

    The overall objective of the Environmental Testing and Verification Coatings and Coating Equipment Program is to verify pollution prevention and performance characteristics of coating technologies and make the results of the testing available to prospective coating technology use...

  12. Automobile or other conveyance and adaptive equipment certificate of eligibility for veterans or members of the armed forces with amyotrophic lateral sclerosis. Interim final rule.

    PubMed

    2015-02-25

    The Department of Veterans Affairs (VA) is amending its adjudication regulation regarding certificates of eligibility for financial assistance in the purchase of an automobile or other conveyance and adaptive equipment. The amendment authorizes automatic issuance of a certificate of eligibility for financial assistance in the purchase of an automobile or other conveyance and adaptive equipment to all veterans with service-connected amyotrophic lateral sclerosis (ALS) and members of the Armed Forces serving on active duty with ALS.

  13. STDN ranging equipment

    NASA Technical Reports Server (NTRS)

    Jones, C. E.

    1975-01-01

    Final results of the Spaceflight Tracking and Data Network (STDN) Ranging Equipment program are summarized. Basic design concepts and final design approaches are described. Theoretical analyses which define requirements and support the design approaches are presented. Design verification criteria are delineated and verification test results are specified.

  14. Eligibility of disabled veterans and members of the armed forces with severe burn injuries for financial assistance in the purchase of an automobile or other conveyance and adaptive equipment. Final rule.

    PubMed

    2013-09-19

    The Department of Veterans Affairs (VA) adopts as a final rule its proposal to amend its adjudication regulation concerning a certificate of eligibility for financial assistance in the purchase of an automobile or other conveyance and adaptive equipment, which was published in the Federal Register on November 5, 2012, and republished for minor technical corrections on November 26, 2012. The amendment is necessary to incorporate statutory changes made by the Veterans' Benefits Act of 2010.

  15. Equipment Only - Solar Resources Measurements at the University of Texas at Austin, TX: Cooperative Research and Development Final Report, CRADA Number CRD-07-222

    SciTech Connect

    Stoffel, T.

    2013-01-01

    Faculty and staff at the University of Texas at Austin collected solar resource measurements at their campus using equipment on loan from the National Renewable Energy Laboratory. The equipment was used to train students on the operation and maintenance of solar radiometers and was returned to NREL's Solar Radiation Research Laboratory upon completion of the CRADA. The resulting data augment the solar resource climatology information required for solar resource characterizations in the U.S. The cooperative agreement was also consistent with NREL's goal of developing an educated workforce to advance renewable energy technologies.

  16. Comparative Occupational Survey of Civilian and Military Members in the Pavements Maintenance and Construction Equipment Operator Specialties. Final Report for Period 1 October 1975-30 October 1977.

    ERIC Educational Resources Information Center

    Cowan, Douglas K.

    A study was conducted to analyze and compare the job performance of civil service and military pavements maintenance workers and construction equipment operators. A military sample of 2,675 and a civilian sample of 1,974 were surveyed by means of a job inventory checklist and relative time spent rating method. Of the three job types that were…

  17. Systematic Model for Validating Equipment Uses in Selected Marketing and Distribution Education Programs. Final Report, February 1, 1980-June 30, 1981.

    ERIC Educational Resources Information Center

    Gildan, Kate; Buckner, Leroy

    Research was conducted to provide a model for selecting equipment for marketing and distributive education programs that was required for the development of the skills or competencies needed to perform in marketing and distribution occupation. A research of the literature identified both competency statements for three program areas--Fashion…

  18. Public health assessment for petitioned public health assessment, Shaffer Equipment Company, Minden, Fayette County, West Virginia, Region 3. CERCLIS No. WVD981038300. Final report

    SciTech Connect

    Not Available

    1993-06-01

    The Shaffer Equipment Company (SEC) site, located in Fayette County, Minden, West Virginia constructed electrical substations for area coal mines from the period 1970 to 1984. The site is approximately one acre and has one building (SEC Equipment Building) that served as both a warehouse and office. Electrical equipment such as transformers, switches, circuit breakers, and capacitors were stored on the site. Dielectric oils that contained polychlorinated biphenyls (PCBs) and 1,2,4-trichlorobenzene were found in on- and off-site soils and sediments. Because PCBs are on site and PCB-contaminated oils reportedly were burned as starter fuel in the warehouse/office building, on- and off-site soil samples and on-site sediment samples were analyzed for polychlorinated dibenzo-p-dioxins (PCDDs) and polychlorinated dibenzo-p-furans (PCDFs). One present potential pathway of exposure that has been identified as past, present, and future concerns involve trespassers onto the SEC site, children playing in yards and Arbuckle Creek, on-site workers in the SEC Equipment Building, and persons that eat snapping turtles from the area.

  19. Investigation to Determine the Validity and Viability of a Regional Biomedical Equipment Technician Program at the Community College Level. Final Report.

    ERIC Educational Resources Information Center

    Mruk, Walter F.; Fenwick, Douglas E.

    A study was conducted to determine the validity and viability of a Southeastern Pennsylvania biomedical equipment technician program at the community college level. The results of a survey questionnaire, site visits, and interviews with administrators of existing health care facilities and ongoing biomedical curricula, indicated the following: (1)…

  20. Recycling of engineering plastics from waste electrical and electronic equipments: influence of virgin polycarbonate and impact modifier on the final performance of blends.

    PubMed

    Ramesh, V; Biswal, Manoranjan; Mohanty, Smita; Nayak, Sanjay K

    2014-05-01

    This study is focused on the recovery and recycling of plastics waste, primarily polycarbonate, poly(acrylonitrile-butadiene-styrene) and high impact polystyrene, from end-of-life waste electrical and electronic equipments. Recycling of used polycarbonate, acrylonitrile-butadiene-styrene, polycarbonate/acrylonitrile-butadiene-styrene and acrylonitrile-butadiene-styrene/high impact polystrene material was carried out using material recycling through a melt blending process. An optimized blend composition was formulated to achieve desired properties from different plastics present in the waste electrical and electronic equipments. The toughness of blended plastics was improved with the addition of 10 wt% of virgin polycarbonate and impact modifier (ethylene-acrylic ester-glycidyl methacrylate). The mechanical, thermal, dynamic-mechanical and morphological properties of recycled blend were investigated. Improved properties of blended plastics indicate better miscibility in the presence of a compatibilizer suitable for high-end application.

  1. An assessment and evaluation for recycle/reuse of contaminated process and metallurgical equipment at the DOE Rocky Flats Plant Site -- Building 865. Final report

    SciTech Connect

    Not Available

    1993-08-01

    An economic analysis of the potential advantages of alternatives for recycling and reusing equipment now stored in Building 865 at the Rocky Flats Plant (RFP) in Colorado has been conducted. The inventory considered in this analysis consists primarily of metallurgical and process equipment used before January 1992, during development and production of nuclear weapons components at the site. The economic analysis consists of a thorough building inventory and cost comparisons for four equipment dispositions alternatives. The first is a baseline option of disposal at a Low Level Waste (LLW) landfill. The three alternatives investigated are metal recycling, reuse with the government sector, and release for unrestricted use. This report provides item-by-item estimates of value, disposal cost, and decontamination cost. The economic evaluation methods documented here, the simple cost comparisons presented, and the data provided as a supplement, should provide a foundation for D&D decisions for Building 865, as well as for similar D&D tasks at RFP and at other sites.

  2. Development of an Industry Dynamometer/Spin Test Facility--Equipment Only: Cooperative Research and Development Final Report, CRADA Number CRD-05-164

    SciTech Connect

    McDade, Mark

    2016-12-01

    The Department of Energy/National Renewable Energy Laboratory (DOE/NREL) owns and operates a megawatt-scale dynamometer used for testing wind turbine drive trains up to 1.5 megawatt (MW) in rated capacity. At this time, this unit is the only unit of its type in the United States, available for use by the American Wind Industry. Currently this dynamometer is heavily backlogged and unavailable to provide testing needed by various wind industry members. DOE/NREL is in possession of two critical pieces of equipment that may be used to develop an alternative Dynamometer facility, but does not have the funds or other resources necessary to develop such a facility. The Participant possesses complimentary facilities and infrastructure that when combined with the NREL equipment can create such a test facility. The Participant is also committed to expending funds to develop and operate such a facility to the subsequent benefit of the Wind Industry and DOE Wind Energy program. In exchange for DOE/NREL providing the critical equipment, the Participant will grant DOE/NREL a minimum of 90 days of testing time per year in the new facility while incurring no facilities fees.

  3. Diagnostics for emission-control-system malfunction on three-way catalyst-equipped vehicles. Final report, November 1983-November 1985

    SciTech Connect

    Duleep, K.G.

    1985-11-01

    The report presents the results of a two part study. In Phase I, the contractor reviewed current manufacturer recommended diagnostic procedures for identifying vehicular emission control malfunctions on three-way catalyst-equipped gasoline-fueled automobiles and also surveyed diagnostic techniques used in the field. Diagnosis of malperformance was limited to the following systems: exhaust gas recirculating, secondary air, fuel, and catalyst. In Phase II, the contractor developed generalized diagnostic procedures for malfunctioning emission control systems and validated these procedures on 52 vehicles. Two mechanics alternatively disabled and repaired the vehicles using the diagnostic and repair procedures. The report also describes inspection procedures developed for the control of smoke emissions from light-duty diesel vehicles. Two types of procedures were developed, for component testing and for inspection/maintenance programs. These procedures were validated on six light-duty vehicles.

  4. Medicare program; inpatient rehabilitation facility prospective payment system for federal fiscal year 2007; certain provisions concerning competitive acquisition for durable medical equipment, prosthetics, orthotics, and supplies (DMEPOS); accreditation of DMEPOS suppliers. Final rule.

    PubMed

    2006-08-18

    This final rule will update the prospective payment rates for inpatient rehabilitation facilities (IRFs) for Federal fiscal year (FY) 2007 (for discharges occurring on or after October 1, 2006 and on or before September 30, 2007) as required under section 1886(j)(3)(C) of the Social Security Act (the Act). We are revising existing policies regarding the prospective payment system within the authority granted under section 1886(j) of the Act. In addition, we are revising the current regulation text to reflect the changes enacted under section 5005 of the Deficit Reduction Act of 2005. This final rule will also establish certain requirements related to competitive acquisition for durable medical equipment, prosthetics, orthotics, and supplies (DMEPOS) and establish accreditation of DMEPOS suppliers as required under section 302 of the Medicare Prescription Drug, Improvement, and Modernization Act of 2003.

  5. VIEW OF ULTRASONIC TESTING EQUIPMENT IN BUILDING 991. THIS EQUIPMENT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW OF ULTRA-SONIC TESTING EQUIPMENT IN BUILDING 991. THIS EQUIPMENT NON-DESTRUCTIVELY TESTS WEAPONS COMPONENTS FOR FLAWS AND CRACKS. (9/11/85) - Rocky Flats Plant, Final Assembly & Shipping, Eastern portion of plant site, south of Spruce Avenue, east of Tenth Street & north of Central Avenue, Golden, Jefferson County, CO

  6. Solar Resource Measurements in Cocoa, Florida (FSEC) - Equipment Loaned to NREL: Cooperative Research and Development Final Report, CRADA Number CRD-08-318

    SciTech Connect

    Stoffel, T.; Afshin, A.

    2014-01-01

    Site-specific measurements of global and diffuse solar irradiance components, passively separated by alternate shading and unshading of a pyranometer mounted under a shading band with alternating opaque and open panels (for a site other than NREL) are needed to verify the underlying theory and mathematical techniques for developing direct, global and diffuse renewable resource data from such a system. These data are used for several research and development activities consistent with the NREL mission: Establish a national 30-year climatological database of measured solar irradiances; Support development of radiative transfer models for estimating solar irradiance from available meteorological observations; Provide solar resource information needed for technology deployment and operations. NREL will provide the supporting equipment (Shadow Bank Stand) for the specially designed shading band. FSEC will provide the calibrated pyranometer and perform data acquisition of the radiometer signal. Data acquired under this agreement will be shared with the NREL Principle Investigator for the purposes of validating techniques for estimating direct radiation from global and diffuse components measured with the ZEBRA system.

  7. Twelve month follow-up report of the conference to promote international sales of US geothermal equipment (CORECT Project): Final report

    SciTech Connect

    Anderson, D.N.

    1988-12-01

    The reverse trade mission ''Conference to Promote International Sales of US Geothermal Equipment'' was organized and managed by the Geothermal Resources Council (GRC) in collaboration with the California Energy Commission (CEC). The mission was held in late September/October of 1987 and was well received by the 23 participants from 18 different countries. Approximately $275,000 in immediate sales can be attributed directly to the program and the estimate of potential future sales runs as high as $4,765,000. It was felt by the attendees that the program was well organized and executed and that the caliber of persons invited to attend was optimum. All of the attendees stated that the function was very informative and beneficial and that they would recommend to others that they attend similar functions. In order to be really effective in exporting a company, a country must be highly visible to potential purchasers. Although this function lasted only two weeks it was considered as a prime first step in the development of a strong US geothermal technology export base program. As a part of the effort to maintain this presence the GRC recommends that this function be followed by other similar functions, courses, seminars, and specific field trips. In addition every effort should be made for US government and industry representatives to visit various countries as often as possible. The GRC is working toward developing an international information-dissemination program, which would include the development of courses for geothermal units in foreign countries.

  8. Solar Equipment

    NASA Technical Reports Server (NTRS)

    1983-01-01

    A medical refrigeration and a water pump both powered by solar cells that convert sunlight directly into electricity are among the line of solar powered equipment manufactured by IUS (Independent Utility Systems) for use in areas where conventional power is not available. IUS benefited from NASA technology incorporated in the solar panel design and from assistance provided by Kerr Industrial Applications Center.

  9. Telescope Equipment

    NASA Technical Reports Server (NTRS)

    1988-01-01

    Renaissance Telescope for high resolution and visual astronomy has five 82-degree Field Tele-Vue Nagler Eyepieces, some of the accessories that contribute to high image quality. Telescopes and eyepieces are representative of a family of optical equipment manufactured by Tele-Vue Optics, Inc.

  10. Medical Issues: Equipment

    MedlinePlus

    ... support & care > living with sma > medical issues > equipment Equipment Individuals with SMA often require a range of ... you can submit an equipment pool request. Helpful Equipment The following is a list of equipment that ...

  11. Rescue Equipment

    NASA Technical Reports Server (NTRS)

    1995-01-01

    The Lifeshear cutter, a rescue tool for freeing accident victims from wreckage, was developed under the Clinton Administration's Technology Reinvestment Program. Prior cutting equipment was cumbersome and expensive; the new cutter is 50 percent lighter and 70 percent cheaper. The cutter is pyrotechnically-actuated, using a miniature version of the power cartridges used for separation devices on the Space Shuttle and other NASA spacecraft. Hi-Shear Technology Corporation developed the cutter with the Jet Propulsion Laboratory and input from the City of Torrance (California) Fire Department.

  12. 36 CFR 1210.34 - Equipment.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... issue disposition instructions within 120 calendar days after receipt of a final inventory. The final..., HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Property Standards § 1210.34 Equipment... Government shall be identified to indicate Federal ownership. (3) A physical inventory of equipment shall...

  13. Aeration equipment for small depths

    NASA Astrophysics Data System (ADS)

    Sluše, Jan; Pochylý, František

    2015-05-01

    Deficit of air in water causes complications with cyanobacteria mainly in the summer months. Cyanobacteria is a bacteria that produces poison called cyanotoxin. When the concentration of cyanobacteria increases, the phenomena "algal bloom" appears, which is very toxic and may kill all the organisms. This article describes new equipment for aeration of water in dams, ponds and reservoirs with small depth. This equipment is mobile and it is able to work without any human factor because its control is provided by a GPS module. The main part of this equipment consists of a floating pump which pumps water from the surface. Another important part of this equipment is an aerator where water and air are blended. Final aeration process runs in the nozzles which provide movement of all this equipment and aeration of the water. Simulations of the flow are solved by multiphase flow with diffusion in open source program called OpenFOAM. Results will be verified by an experiment.

  14. Cleaning supplies and equipment

    MedlinePlus

    ... gov/ency/patientinstructions/000443.htm Cleaning supplies and equipment To use the sharing features on this page, ... to clean supplies and equipment. Disinfecting Supplies and Equipment Start by wearing the right personal protective equipment ( ...

  15. Aquatic Equipment Information.

    ERIC Educational Resources Information Center

    Sova, Ruth

    Equipment usually used in water exercise programs is designed for variety, intensity, and program necessity. This guide discusses aquatic equipment under the following headings: (1) equipment design; (2) equipment principles; (3) precautions and contraindications; (4) population contraindications; and (5) choosing equipment. Equipment is used…

  16. Personal protective equipment

    MedlinePlus

    ... medlineplus.gov/ency/patientinstructions/000447.htm Personal protective equipment To use the sharing features on this page, please enable JavaScript. Personal protective equipment is special equipment you wear to create a ...

  17. Common NICU Equipment

    MedlinePlus

    ... care unit (NICU) > Common NICU equipment Common NICU equipment E-mail to a friend Please fill in ... understand how they can help your baby. What equipment is commonly used in the NICU? Providers use ...

  18. Experimental Equipment for Powder Processing

    DTIC Science & Technology

    2009-08-20

    1 Final Report Experimental Equipment for Powder Processing Contract Number FA9550-06- 1 -0417 Patrick Kwon...Report Documentation Page Form ApprovedOMB No. 0704-0188 Public reporting burden for the collection of information is estimated to average 1 hour...subject to a penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. 1 . REPORT DATE

  19. Medicare Program; End-Stage Renal Disease Prospective Payment System, Coverage and Payment for Renal Dialysis Services Furnished to Individuals With Acute Kidney Injury, End-Stage Renal Disease Quality Incentive Program, Durable Medical Equipment, Prosthetics, Orthotics and Supplies Competitive Bidding Program Bid Surety Bonds, State Licensure and Appeals Process for Breach of Contract Actions, Durable Medical Equipment, Prosthetics, Orthotics and Supplies Competitive Bidding Program and Fee Schedule Adjustments, Access to Care Issues for Durable Medical Equipment; and the Comprehensive End-Stage Renal Disease Care Model. Final rule.

    PubMed

    2016-11-04

    This rule updates and makes revisions to the End-Stage Renal Disease (ESRD) Prospective Payment System (PPS) for calendar year 2017. It also finalizes policies for coverage and payment for renal dialysis services furnished by an ESRD facility to individuals with acute kidney injury. This rule also sets forth requirements for the ESRD Quality Incentive Program, including the inclusion of new quality measures beginning with payment year (PY) 2020 and provides updates to programmatic policies for the PY 2018 and PY 2019 ESRD QIP. This rule also implements statutory requirements for bid surety bonds and state licensure for the Durable Medical Equipment, Prosthetics, Orthotics, and Supplies (DMEPOS) Competitive Bidding Program (CBP). This rule also expands suppliers' appeal rights in the event of a breach of contract action taken by CMS, by revising the appeals regulation to extend the appeals process to all types of actions taken by CMS for a supplier's breach of contract, rather than limit an appeal for the termination of a competitive bidding contract. The rule also finalizes changes to the methodologies for adjusting fee schedule amounts for DMEPOS using information from CBPs and for submitting bids and establishing single payment amounts under the CBPs for certain groupings of similar items with different features to address price inversions. Final changes also are made to the method for establishing bid limits for items under the DMEPOS CBPs. In addition, this rule summarizes comments on the impacts of coordinating Medicare and Medicaid Durable Medical Equipment for dually eligible beneficiaries. Finally, this rule also summarizes comments received in response to a request for information related to the Comprehensive ESRD Care Model and future payment models affecting renal care.

  20. Exercise Equipment: Neutral Buoyancy

    NASA Technical Reports Server (NTRS)

    Shackelford, Linda; Valle, Paul

    2016-01-01

    Load Bearing Equipment for Neutral Buoyancy (LBE-NB) is an exercise frame that holds two exercising subjects in position as they apply counter forces to each other for lower extremity and spine loading resistance exercises. Resistance exercise prevents bone loss on ISS, but the ISS equipment is too massive for use in exploration craft. Integrating the human into the load directing, load generating, and motion control functions of the exercise equipment generates safe exercise loads with less equipment mass and volume.

  1. Mobile Equipment Expands Inventory.

    ERIC Educational Resources Information Center

    McGough, Robert L.; And Others

    1978-01-01

    Describes the Mobile Equipment Modules (MEM) system in Duluth, Minnesota. MEM is a way to hold down costs and increase learning opportunities by consolidating purchases of expensive shop equipment within the school district, grouping the equipment in modules, and scheduling and moving it from school to school as needed. (MF)

  2. 75 FR 1276 - Requirements for Subsurface Safety Valve Equipment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-11

    ... Equipment AGENCY: Minerals Management Service (MMS), Interior. ACTION: Final rule. SUMMARY: The MMS is... Subsurface Safety Valve Equipment (API Spec 14A) into its regulations. The MMS is incorporating the Eleventh.../API Specification 14A, Specification for Subsurface Safety Valve Equipment, Eleventh Edition,...

  3. Electric utility engineer`s FGD manual -- Volume 2: Major mechanical equipment; FGD proposal evaluations; Use of FGDPRISM in FGD system modification, proposal, evaluation, and design; FGD system case study. Final report

    SciTech Connect

    1996-03-04

    Part 2 of this manual provides the electric utility engineer with detailed technical information on some of the major mechanical equipment used in the FGD system. The objectives of Part 2 are the following: to provide the electric utility engineer with information on equipment that may be unfamiliar to him, including ball mills, vacuum filters, and mist eliminators; and to identify the unique technique considerations imposed by an FGD system on more familiar electric utility equipment such as fans, gas dampers, piping, valves, and pumps. Part 3 provides an overview of the recommended procedures for evaluating proposals received from FGD system vendors. The objectives are to provide procedures for evaluating the technical aspects of proposals, and to provide procedures for determining the total costs of proposals considering both initial capital costs and annual operating and maintenance costs. The primary objective of Part 4 of this manual is to provide the utility engineer who has a special interest in the capabilities of FGDPRISM [Flue Gas Desulfurization PRocess Integration and Simulation Model] with more detailed discussions of its uses, requirements, and limitations. Part 5 is a case study in using this manual in the preparation of a purchase specification and in the evaluation of proposals received from vendors. The objectives are to demonstrate how the information contained in Parts 1 and 2 can be used to improve the technical content of an FGD system purchase specification; to demonstrate how the techniques presented in Part 3 can be used to evaluate proposals received in response to the purchase specification; and to illustrate how the FGDPRISM computer program can be used to establish design parameters for the specification and evaluate vendor designs.

  4. Technology Equipment Rooms.

    ERIC Educational Resources Information Center

    Day, C. William

    2001-01-01

    Examines telecommunications equipment room design features that allow for growth and can accommodate numerous equipment replacements and upgrades with minimal service disruption and with minimal cost. Considerations involving the central hub, power and lighting needs, air conditioning, and fire protection are discussed. (GR)

  5. Shipboard Electronic Equipments.

    ERIC Educational Resources Information Center

    Naval Personnel Program Support Activity, Washington, DC.

    Fundamentals of major electronic equipments on board ships are presented in this text prepared for naval officers in general. Basic radio principles are discussed in connection with various types of transmitters, receivers, antennas, couplers, transfer panels, remote-control units, frequency standard equipments, teletypewriters, and facsimile…

  6. Equipment & New Products.

    ERIC Educational Resources Information Center

    Poitras, Adrian W., Ed.

    1977-01-01

    Presents several new products and equipment for teaching college science courses such as laser optics bench, portable digital thermometer, solar energy furnaces and blackboard optics kit. A description of all equipment or products, cost, and addresses of manufacturers are also included. (HM)

  7. Engineer Equipment Mechanic.

    ERIC Educational Resources Information Center

    Marine Corps Inst., Washington, DC.

    Developed as part of the Marine Corps Institute (MCI) correspondence training program, this course on engineer equipment mechanics is designed to advance the professional competence of privates through sergeants as equipment mechanics, Military Occupation Specialty 1341, and is adaptable for nonmilitary instruction. Introductory materials include…

  8. Equipment Operator 1 & C.

    ERIC Educational Resources Information Center

    Naval Education and Training Program Development Center, Pensacola, FL.

    The Rate Training Manual and Nonresident Career Course (RTM/NRCC) form a self-study package to assist Navy Equipment Operators First and Chief in fulfilling the requirements of their rating. (Navy Equipment Operators First and Chief direct and coordinate efforts of individuals and crews in construction, earthmoving, roadbuilding, quarrying, and…

  9. AUDIOVISUAL EQUIPMENT STANDARDS.

    ERIC Educational Resources Information Center

    PATTERSON, PIERCE E.; AND OTHERS

    RECOMMENDED STANDARDS FOR AUDIOVISUAL EQUIPMENT WERE PRESENTED SEPARATELY FOR GRADES KINDERGARTEN THROUGH SIX, AND FOR JUNIOR AND SENIOR HIGH SCHOOLS. THE ELEMENTARY SCHOOL EQUIPMENT CONSIDERED WAS THE FOLLOWING--CLASSROOM LIGHT CONTROL, MOTION PICTURE PROJECTOR WITH MOBILE STAND AND SPARE REELS, COMBINATION 2 INCH X 2 INCH SLIDE AND FILMSTRIP…

  10. Adaptive Recreational Equipment.

    ERIC Educational Resources Information Center

    Schilling, Mary Lou, Ed.

    1983-01-01

    Designed for teachers interested in therapeutic recreation, the document lists sources of adaptive recreational equipment and their homemade counterparts. Brief descriptions for ordering or constructing recreational equipment for the visually impaired, poorly coordinated, physically impaired, and mentally retarded are given. Specific adaptations…

  11. Final Technical Report

    SciTech Connect

    Gilbert, Chris

    2014-11-13

    The project, Capital Investment to Fund Equipment Purchases and Facility Modifications to Create a Sustainable Future for EnergyXchange served to replace landfill gas energy with alternative energy resources, primarily solar and wood waste. This is the final project closeout report.

  12. Generic seismic ruggedness of power plant equipment

    SciTech Connect

    Merz, K.L. )

    1991-08-01

    This report updates the results of a program with the overall objective of demonstrating the generic seismic adequacy of as much nuclear power plant equipment as possible by means of collecting and evaluating existing seismic qualification test data. These data are then used to construct ruggedness'' spectra below which equipment in operating plants designed to earlier earthquake criteria would be generically adequate. This document is an EPRI Tier 1 Report. The report gives the methodology for the collection and evaluation of data which are used to construct a Generic Equipment Ruggedness Spectrum (GERs) for each equipment class considered. The GERS for each equipment class are included in an EPRI Tier 2 Report with the same title. Associated with each GERS are inclusion rules, cautions, and checklists for field screening of in-place equipment for GERS applicability. A GERS provides a measure of equipment seismic resistance based on available test data. As such, a GERS may also be used to judge the seismic adequacy of similar new or replacement equipment or to estimate the seismic margin of equipment re-evaluated with respect to earthquake levels greater than considered to date, resulting in fifteen finalized GERS. GERS for relays (included in the original version of this report) are now covered in a separate report (NP-7147). In addition to the presentation of GERS, the Tier 2 report addresses the applicability of GERS to equipment of older vintage, methods for estimating amplification factors for evaluating devices installed in cabinets and enclosures, and how seismic test data from related studies relate to the GERS approach. 28 refs., 5 figs., 4 tabs.

  13. Selecting the right ultrasound equipment--an administrator's perspective.

    PubMed

    Jacoby, Robert

    2003-01-01

    Recent advancements in ultrasound equipment, technology and capability make the selection of new or replacement equipment a difficult task. It is not uncommon that the sonographers will have different needs and wants from the equipment than do the radiologists. This potential hurdle needs to be addressed in order to arrive at a mutually acceptable selection. Vendors across the board all have very competitive products and they each have that special little "function" or "enhancement" that sets them apart from their competitor. The customer needs to approach the evaluation of the equipment in a very objective manner in order to truly understand not only the differences of each piece of equipment but the actual capability of each piece of equipment. In the end however, it is the individual sonographer that will be utilizing the equipment most of the time and they should have the final say to department management as to which equipment is selected.

  14. Accidents associated with equipment.

    PubMed

    Heath, M L

    1984-01-01

    Serious accidents in which the possibility of equipment-related hazards are raised have been reported to the Scientific and Technical Branch of the Department of Health and Social Security. The author has examined anonymous summaries of 23 such reports of events which occurred over a 5-year period. The principle cause of catastrophe in seventeen of the incidents was user error involving disconnexion or misconnexion. Faulty systems of equipment management combined in some cases with inadequate pre-anaesthetic checking of apparatus were responsible for the other instances. Appropriate systems of equipment management and checking together with meticulous basic clinical monitoring are recommended as the best safeguards in anaesthetic practice.

  15. [Medical Equipment Maintenance Methods].

    PubMed

    Liu, Hongbin

    2015-09-01

    Due to the high technology and the complexity of medical equipment, as well as to the safety and effectiveness, it determines the high requirements of the medical equipment maintenance work. This paper introduces some basic methods of medical instrument maintenance, including fault tree analysis, node method and exclusive method which are the three important methods in the medical equipment maintenance, through using these three methods for the instruments that have circuit drawings, hardware breakdown maintenance can be done easily. And this paper introduces the processing methods of some special fault conditions, in order to reduce little detours in meeting the same problems. Learning is very important for stuff just engaged in this area.

  16. [Suggestions for buying medical equipment in hospitals].

    PubMed

    Trontzos, Christos

    2004-01-01

    TO THE EDITOR: Both in Greece and in other European countries there are plans to buy more medical equipment. If the whole procedure is not effective, it may result to a large deficit in the hospital budget. The total hospital deficit now in Greece is about 2.5 billion euros. It is suggested that in every hospital, the Authorized Committee for Medical Equipment Purchasing, should include the following: One Director of a Medical Department related to the equipment to be bought and another Director of a Medical Department, unrelated. One accountant. One legal advisor specialized in hospital affairs. One economical advisor specialized in banking who will be able to suggest leasing or other means of financing the purchase of the relevant equipment. A cost accounting analysis described by a detailed report, should be provided to secure that the equipment to be bought should be cost-effective and leaving a reasonable surplus after not more than 10 years from the time it is installed. Finally, the possibility of using one expensive equipment to cover the needs of more than one hospitals either by moving the equipment (i.e. the PET/CT camera by a large vehicle) or by transferring the patients to a central hospital, may be provided by the above Authorized Committee.

  17. Leasing versus buying equipment.

    PubMed

    Grossman, R

    1983-01-01

    For the upgrading of equipment that is necessary in radiologic practice, leasing is more convenient and less expensive than buying. Changes in tax laws, embodied in the Economic Recovery Act of 1981, have increased tax benefits of this arrangement.

  18. Equipment & New Products.

    ERIC Educational Resources Information Center

    Poitras, Adrian W., Ed.

    1979-01-01

    Reviews new science equipment and products for the laboratory. Includes hand-held calculators, fiberglass fume hoods, motorized microtomy, disposable mouse cages, and electric timers. Describes 11 products total. Provides manufacturer name, address, and price. (MA)

  19. Selecting Library Furniture & Equipment.

    ERIC Educational Resources Information Center

    Media & Methods, 1997

    1997-01-01

    Offers suggestions for selecting school library furniture and equipment. Describes various models of computer workstations; reading tables and chairs; and shelving. Sidebar lists names and addresses of library furniture manufactures and distributors. (AEF)

  20. Automatic Test Equipment

    DTIC Science & Technology

    1980-02-28

    Search Terms Automatic Test Equipment Frequency Analyzers Oscilloscopes Pulse Analyzers Signal Generators "Etc." Third Level Search Guided...VAST Building Block Equipment RF Test Point Control Switch Digital Multimeter Frequency and Time Interval Meter Digital Word Generator Delay...Generator RF Amplifier, 95 Hz-2 GHz RF Amplifier, 2-4 GHz RF Amplifier, 4-8 GHz RF Amplifier, 8-12.2 GHz Signal Generator, 0.1 Hz-50 kHz

  1. Listing of Food Service Equipment.

    ERIC Educational Resources Information Center

    National Sanitation Foundation, Ann Arbor, MI. Testing Lab.

    A comprehensive listing of food service equipment including--(1) companies authorized to use the National Sanitation Foundation seal of approval, and (2) equipment listed as meeting NSF standards including soda fountains, spray-type dishwashers, dishwashing equipment, cooking equipment, commerical cooking and warming equipment, freezers,…

  2. 78 FR 59623 - Emergency Medical Equipment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-27

    ... kits to amend the ``no go'' provision. Data show that allowing these items to be incomplete, missing...) should remain, ``no-go'' items. See 66 FR 19033. That final rule's preamble also states that the current... emergency medical equipment items are ``no-go'' items and AEDs should also be considered ``no-go''...

  3. 43 CFR 12.934 - Equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... shall issue disposition instructions within 120 calendar days after receipt of a final inventory. The... Institutions of Higher Education, Hospitals, and Other Non-Profit Organizations Post-Award Requirements § 12... identified to indicate Federal ownership. (3) A physical inventory of equipment shall be taken and...

  4. 38 CFR 49.34 - Equipment.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... shall issue disposition instructions within 120 calendar days after receipt of a final inventory. The... ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER... identified to indicate Federal ownership. (3) A physical inventory of equipment shall be taken and...

  5. Medical equipment management strategies.

    PubMed

    Wang, Binseng; Furst, Emanuel; Cohen, Ted; Keil, Ode R; Ridgway, Malcolm; Stiefel, Robert

    2006-01-01

    Clinical engineering professionals need to continually review and improve their management strategies in order to keep up with improvements in equipment technology, as well as with increasing expectations of health care organizations. In the last 20 years, management strategies have evolved from the initial obsession with electrical safety to flexible criteria that fit the individual institution's needs. Few hospitals, however, are taking full advantage of the paradigm shift offered by the evolution of joint Commission standards. The focus should be on risks caused by equipment failure, rather than on equipment with highest maintenance demands. Furthermore, it is not enough to consider risks posed by individual pieces of equipment to individual patients. It is critical to anticipate the impact of an equipment failure on larger groups of patients, especially when dealing with one of a kind, sophisticated pieces of equipment that are required to provide timely and accurate diagnoses for immediate therapeutic decisions or surgical interventions. A strategy for incorporating multiple criteria to formulate appropriate management strategies is provided in this article.

  6. About Personal Protective Equipment (PPE)

    MedlinePlus

    ... Equipment for Infection Control Questions About Personal Protective Equipment (PPE) Share Tweet Linkedin Pin it More sharing ... Print Q1. How do manufacturers ensure personal protective equipment (PPE) is safe and effective? A1. To help ...

  7. Prioritizing equipment for replacement.

    PubMed

    Capuano, Mike

    2010-01-01

    It is suggested that clinical engineers take the lead in formulating evaluation processes to recommend equipment replacement. Their skill, knowledge, and experience, combined with access to equipment databases, make them a logical choice. Based on ideas from Fennigkoh's scheme, elements such as age, vendor support, accumulated maintenance cost, and function/risk were used.6 Other more subjective criteria such as cost benefits and efficacy of newer technology were not used. The element of downtime was also omitted due to the data element not being available. The resulting Periop Master Equipment List and its rationale was presented to the Perioperative Services Program Council. They deemed the criteria to be robust and provided overwhelming acceptance of the list. It was quickly put to use to estimate required capital funding, justify items already thought to need replacement, and identify high-priority ranked items for replacement. Incorporating prioritization criteria into an existing equipment database would be ideal. Some commercially available systems do have the basic elements of this. Maintaining replacement data can be labor-intensive regardless of the method used. There is usually little time to perform the tasks necessary for prioritizing equipment. However, where appropriate, a clinical engineering department might be able to conduct such an exercise as shown in the following case study.

  8. German mining equipment

    SciTech Connect

    Not Available

    1993-10-01

    The German mining equipment industry developed to supply machines and services to the local mining industry, i.e., coal, lignite, salt, potash, ore mining, industrial minerals, and quarrying. The sophistication and reliability of its technology also won it worldwide export markets -- which is just as well since former major domestic mining sectors such as coal and potash have declined precipitously, and others such as ore mining have all but disappeared. Today, German mining equipment suppliers focus strongly on export sales, and formerly unique German mining technologies such as continuous mining with bucket wheel excavators and conveyors for open pits, or plowing of underground coal longwalls are widely used abroad. The status of the German mining equipment industry is reviewed.

  9. Equipment Operational Requirements

    SciTech Connect

    Greenwalt, B; Henderer, B; Hibbard, W; Mercer, M

    2009-06-11

    The Iraq Department of Border Enforcement is rich in personnel, but poor in equipment. An effective border control system must include detection, discrimination, decision, tracking and interdiction, capture, identification, and disposition. An equipment solution that addresses only a part of this will not succeed, likewise equipment by itself is not the answer without considering the personnel and how they would employ the equipment. The solution should take advantage of the existing in-place system and address all of the critical functions. The solutions are envisioned as being implemented in a phased manner, where Solution 1 is followed by Solution 2 and eventually by Solution 3. This allows adequate time for training and gaining operational experience for successively more complex equipment. Detailed descriptions of the components follow the solution descriptions. Solution 1 - This solution is based on changes to CONOPs, and does not have a technology component. It consists of observers at the forts and annexes, forward patrols along the swamp edge, in depth patrols approximately 10 kilometers inland from the swamp, and checkpoints on major roads. Solution 2 - This solution adds a ground sensor array to the Solution 1 system. Solution 3 - This solution is based around installing a radar/video camera system on each fort. It employs the CONOPS from Solution 1, but uses minimal ground sensors deployed only in areas with poor radar/video camera coverage (such as canals and streams shielded by vegetation), or by roads covered by radar but outside the range of the radar associated cameras. This document provides broad operational requirements for major equipment components along with sufficient operational details to allow the technical community to identify potential hardware candidates. Continuing analysis will develop quantities required and more detailed tactics, techniques, and procedures.

  10. A flight-test and simulation evaluation of the longitudinal final approach and landing performance of an automatic system for a light wing loading STOL aircraft equipped with wing spoilers

    NASA Technical Reports Server (NTRS)

    Brown, S. C.; Hardy, G. H.; Hindson, W. S.

    1984-01-01

    As part of a comprehensive flight-test investigation of short takeoff and landing (STOL) operating systems for the terminal systems for the terminal area, an automatic landing system has been developed and evaluated for a light wing-loading turboprop-powered aircraft. An advanced digital avionics system performed display, navigation, guidance, and control functions for the test aircraft. Control signals were generated in order to command powered actuators for all conventional controls and for a set of symmetrically driven wing spoilers. This report describes effects of the spoiler control on longitudinal autoland (automatic landing) performance. Flight-test results, with and without spoiler control, are presented and compared with available (basically, conventional takeoff and landing) performance criteria. These comparisons are augmented by results from a comprehensive simulation of the controlled aircraft that included representations of the microwave landing system navigation errors that were encountered in flight as well as expected variations in atmospheric turbulence and wind shear. Flight-test results show that the addition of spoiler control improves the touchdown performance of the automatic landing system. Spoilers improve longitudinal touchdown and landing pitch-attitude performance, particularly in tailwind conditions. Furthermore, simulation results indicate that performance would probably be satisfactory for a wider range of atmospheric disturbances than those encountered in flight. Flight results also indicate that the addition of spoiler control during the final approach does not result in any measurable change in glidepath track performance, and results in a very small deterioration in airspeed tracking. This difference contrasts with simulations results, which indicate some improvement in glidepath tracking and no appreciable change in airspeed tracking. The modeling problem in the simulation that contributed to this discrepancy with flight was

  11. Equipment Management Manual

    NASA Technical Reports Server (NTRS)

    1992-01-01

    The NASA Equipment Management Manual (NHB 4200.1) is issued pursuant to Section 203(c)(1) of the National Aeronautics and Space Act of 1958, as amended (42 USC 2473), and sets forth policy, uniform performance standards, and procedural guidance to NASA personnel for the acquisition, management, and use of NASA-owned equipment. This revision is effective upon receipt. This is a controlled manual, issued in loose-leaf form, and revised through page changes. Additional copies for internal use may be obtained through normal distribution.

  12. 40 CFR 63.1281 - Control equipment requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... in a thermal treatment unit for which the owner or operator has been issued a final permit under 40... reactivated in a thermal treatment unit equipped with and operating organic air emission controls in accordance with this section. (C) Regenerated or reactivated in a thermal treatment unit equipped with...

  13. Equipment Report AN/SRN-19(V).

    DTIC Science & Technology

    1981-07-01

    NAVAL ELECTRONIC D SYSTEMS COMMRND - ~g JAN 27 1982 EQUIPMENT REPORT RN/ SRN -19(V) NRVRL NERPONS SUPPORT CENTER CRRNE, INDIRNR Published by the...j1 _ _ 4 T1 bE -I "- RI ’R , -O R Fleet Reliability Assessment Program Equipment Report AN/ SRN -19(V) Final Report - 1981 R~P~ mBER Charles...20360 72 N/A Approved for public release ; Distribution unlimited 𔄁 ’i61 F-F Ti’ A- yE--- 𔄂 SO~pE M F’ - : ,]- . . 19 KEY WORr’s , rr-~r

  14. Engineer Equipment Operator.

    ERIC Educational Resources Information Center

    Marine Corps Inst., Washington, DC.

    This student guide, one of a series of correspondence training courses designed to improve the job performance of members of the Marine Corps, deals with the skills needed by engineer equipment operators. Addressed in the seven individual units of the course are the following topics: introduction to Military Occupation Specialty (MOS) 1345…

  15. Engineer Equipment Chief.

    ERIC Educational Resources Information Center

    Marine Corps Inst., Washington, DC.

    This student guide, one of a series of correspondence training courses designed to improve the job performance of members of the Marine Corps, deals with the skills needed by engineer equipment chiefs. Addressed in the five individual units of the course are the following topics: construction management (planning, scheduling, and supervision);…

  16. Homemade Innovative Play Equipment.

    ERIC Educational Resources Information Center

    Pearson, L. Roger, Comp.

    Sponsored by the Title III Elementary and Secondary Education Act Project "Discovery Outdoor Education", this guide is a collection of inexpensive, innovative, homemade equipment and devices for physical activities. Although designed for the impaired, disabled, and handicapped, these materials are adaptable to and applicable for groups…

  17. Equipment & New Products.

    ERIC Educational Resources Information Center

    Poitras, Adrian W., Ed.

    1977-01-01

    Presents information about equipment and new products such as the melting point instrument and TV-microscope coupler which are helpful in college science teaching. Descriptions of each product, how it operates, its prices, and address for ordering are presented. (HM)

  18. Lennox - Student Training Equipment.

    ERIC Educational Resources Information Center

    Lennox Industries, Inc., Marshalltown, IA.

    Presents a series of demonstration units designed by Lennox Industries for the purpose of training students to become familiar with Lennox mechanical equipment. Demonstrators are designed to present technical information in a clear simplified manner thus reducing frustration for the beginning trainee. The following demonstrators are available--(1)…

  19. Basic Engineer Equipment Mechanic.

    ERIC Educational Resources Information Center

    Marine Corps Inst., Washington, DC.

    This student guide, one of a series of correspondence training courses designed to improve the job performance of members of the Marine Corps, deals with the skills needed by basic engineer equipment mechanics. Addressed in the four individual units of the course are the following topics: mechanics and their tools (mechanics, hand tools, and power…

  20. Dairy Equipment Lubrication

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Lake To Lake Dairy Cooperative, Manitowoc, Wisconsin, operates four plants in Wisconsin for processing milk, butter and cheese products from its 1,300 member farms. The large co-op was able to realize substantial savings by using NASA information for improved efficiency in plant maintenance. Under contract to Marshall Space Flight Center, Midwest Research Institute compiled a handbook consolidating information about commercially available lubricants. The handbook details chemical and physical properties, applications, specifications, test procedures and test data for liquid and solid lubricants. Lake To Lake's plant engineer used the handbook to effect savings in maintenance labor and materials costs by reducing the number of lubricants used on certain equipment. Strict U.S. Department of Agriculture and Food and Drug Administration regulations preclude lubrication changes n production equipment, but the co-op's maintenance chief was able to eliminate seven types of lubricants for ancillary equipment, such as compressors and high pressure pumps. Handbook data enabled him to select comparable but les expensive lubricants in the materials consolidation process, and simplified lubrication schedules and procedures. The handbook is in continuing use as a reference source when a new item of equipment is purchased.

  1. Vocational Education Equipment Standards. Revised.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Public Instruction, Raleigh. Div. of Vocational Education.

    This document lists equipment and equipment-like supplies used in classrooms in nine vocational education programs in North Carolina. It was prepared to help local educational agencies assess the adequacy of their vocational education equipment; identify and plan for equipment purchases to meet the minimum requirements; and determine the…

  2. Astronomical Equipment for Amateurs

    NASA Astrophysics Data System (ADS)

    Mobberley, Martin

    Telescopes - refractors and reflectors - are the main items of equipment used by almost every amateur astronomer. The purpose of astronomical telescopes is to collect and focus more light than the human eye can, forming an image that can be viewed, photographed, or analysed. Astronomical Equipment for Amateurs makes buying and using both telescopes and their ancillary instruments easy for astronomers of all abilities. It begins by looking at the advantages and disadvantages of the basic types of refractors, reflectors, mountings and accessories. Observation techniques are also included, along with the use of filters, (colour, anti-pollution and nebula), types of photography (piggy-back, prime focus and eyepiece projection), and also CCD imaging (including types of CCD camera and their advantages and disadvantages compared to photography). Martin Mobberley provides a fascinating insight into astronomical software.

  3. Equipment management in practice.

    PubMed

    Garrett, J A

    1984-01-01

    This article describes the setting up, funding and organization of an in-house equipment management service in the Bristol & Weston Health Authority. Existing resources were redeployed to form the present service. The range of equipment now maintained under the auspices of the Medical Physics Bioengineering Group has a capital value of 12 million pounds. All work is costed and a charge made to the client for whom work is carried out. A team of 27 medical physics technicians and three graduate engineers are maintained from this source of income. This method of funding is now making way for a system of job costing which will provide a basis for comparison with an outside service.

  4. Army Equipment Modernization Plan

    DTIC Science & Technology

    2013-01-01

    transition , we must continue to provide the Nation with the best equipped, most modernized, and highly capable Army to prevail in any operational...interoperability. • Conducted the Initial Operational Test and Evaluation (IOTE) for WIN-T Inc 2 provid- ing an initial on-the-move capability to BCTs and...the Joint Air to Ground Missile (JAGM) which supports the transition of Army Hellfire missile to a joint missile system and replaces the Marine

  5. Advanced service equipment

    NASA Technical Reports Server (NTRS)

    Mockovciak, J., Jr.

    1982-01-01

    Orbiter-based service equipment needs/usage are identified by considering a broad spectrum of on-orbit operational scenarios associated with three primary mission events: initial launch, revisits, and Earth return. Nominal and alternate modes of operation, contingency situations (as remote manipulator system inoperative), and Orbiter close proximity operations are included. Satellite classes considered are direct delivery and servicing of the orbiter, low Earth orbiter/propulsion, sorties and DOD, geosatellites, and planetary and other satellites.

  6. Secure authenticated video equipment

    SciTech Connect

    Doren, N.E.

    1993-07-01

    In the verification technology arena, there is a pressing need for surveillance and monitoring equipment that produces authentic, verifiable records of observed activities. Such a record provides the inspecting party with confidence that observed activities occurred as recorded, without undetected tampering or spoofing having taken place. The secure authenticated video equipment (SAVE) system provides an authenticated series of video images of an observed activity. Being self-contained and portable, it can be installed as a stand-alone surveillance system or used in conjunction with existing monitoring equipment in a non-invasive manner. Security is provided by a tamper-proof camera enclosure containing a private, electronic authentication key. Video data is transferred communication link consisting of a coaxial cable, fiber-optic link or other similar media. A video review station, located remotely from the camera, receives, validates, displays and stores the incoming data. Video data is validated within the review station using a public key, a copy of which is held by authorized panics. This scheme allows the holder of the public key to verify the authenticity of the recorded video data but precludes undetectable modification of the data generated by the tamper-protected private authentication key.

  7. 12. VIEW OF REMOTELY OPERATED EQUIPMENT. OPERATORS VIEWED THE EQUIPMENT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. VIEW OF REMOTELY OPERATED EQUIPMENT. OPERATORS VIEWED THE EQUIPMENT THROUGH A WATER-FILLED WINDOW. (10/8/81) - Rocky Flats Plant, Plutonium Recovery Facility, Northwest portion of Rocky Flats Plant, Golden, Jefferson County, CO

  8. Tools and Equipment Modeling for Automobile Interactive Assembling Operating Simulation

    SciTech Connect

    Wu Dianliang; Zhu Hongmin

    2010-05-21

    Tools and equipment play an important role in the simulation of virtual assembly, especially in the assembly process simulation and plan. Because of variety in function and complexity in structure and manipulation, the simulation of tools and equipments remains to be a challenge for interactive assembly operation. Based on analysis of details and characteristics of interactive operations for automobile assembly, the functional requirement for tools and equipments of automobile assembly is given. Then, a unified modeling method for information expression and function realization of general tools and equipments is represented, and the handling methods of manual, semi-automatic, automatic tools and equipments are discussed. Finally, the application in assembly simulation of rear suspension and front suspension of Roewe 750 automobile is given. The result shows that the modeling and handling methods are applicable in the interactive simulation of various tools and equipments, and can also be used for supporting assembly process planning in virtual environment.

  9. Getting Equipped and Staying Equipped, Part 2: Finding the Funds.

    ERIC Educational Resources Information Center

    Jordahl, Gregory; Orwig, Ann

    1995-01-01

    Suggests how school libraries can fund computer equipment; gain assistance from high-tech businesses; develop business partnerships and foundations; lease equipment; accept equipment donations; fund raise; build money into the budget; and communicate school needs with budget voters. Sidebars include leasing advice; resources for parent-teacher…

  10. Highway Maintenance Equipment Operator. Specialized Equipment. Training Materials.

    ERIC Educational Resources Information Center

    Perky, Sandra Dutreau; And Others

    This curriculum guide provides instructional materials to assist in training equipment operators in the safe and effective use of highway maintenance equipment. It includes 18 units of instruction covering the large equipment used in maintenance operations. Each unit of instruction consists of eight basic components: performance objectives,…

  11. The development of straightness measuring equipment. Final report

    SciTech Connect

    Demint, P.D.; Abraham, M.

    1997-05-20

    This report details work performed between Lockheed Martin Energy Systems, Inc. (LMES) and UTE Straight-O-Matic (UTE) under the National Machine Tool Partnership program. This work included the design and construction of an automatic straightness measuring system capable of retrofitting to existing machines. 1 fig.

  12. precision deburring using NC and robot equipment. Final report

    SciTech Connect

    Gillespie, L.K.

    1980-05-01

    Deburring precision miniature components is often time consuming and inconsistent. Although robots are available for deburring parts, they are not precise enough for precision miniature parts. Numerical control (NC) machining can provide edge break consistencies to meet requirements such as 76.2-..mu..m maximum edge break (chamfer). Although NC machining has a number of technical limitations which prohibits its use on many geometries, it can be an effective approach to features that are particularly difficult to deburr.

  13. Equipment proposal for Bevalac experiments. Final technical report

    SciTech Connect

    Brady, F. P.; Romero, J. L.

    1983-01-01

    A large Multiple Sampling Ionization Chamber (MUSIC) has been developed as a part of the Heavy Ion Spectrometer System (HISS). This facility is being used for the study of relativistic nuclear collisions at the Bevalac of Lawrence Berkeley Laboratory. We have measured for MUSIC a single event resolution of 15% for Fe beam and a charge resolution better than 0.5 units of charge for a Ne beam. These results indicate that a charge resolution of one unit from Z = 7 to Z = 100 should be achieved with the present detector.

  14. How to Use Equipment Therapeutically.

    ERIC Educational Resources Information Center

    Bowne, Douglas

    1986-01-01

    Shares therapeutic and economic practices surrounding equipment used in New York's Higher Horizons adventure program of therapy for troubled youth. Encourages educators, therapists, and administrators to explore relationship between equipment selection, program goals, and clients. (NEC)

  15. TELEMETRY EQUIPMENT WITH DIGITAL READING,

    DTIC Science & Technology

    Contents: Basic peculiarities of telemetry equipment with digital reading ; Elements of pulse technology applied in telemetry equipment with digital... reading ; Digital reading systems; Telemetry systems with digital reading . (Author)

  16. Precision Instrument and Equipment Repairers.

    ERIC Educational Resources Information Center

    Wyatt, Ian

    2001-01-01

    Explains the job of precision instrument and equipment repairers, who work on cameras, medical equipment, musical instruments, watches and clocks, and industrial measuring devices. Discusses duties, working conditions, employment and earnings, job outlook, and skills and training. (JOW)

  17. Safety Equipment in the Lab.

    ERIC Educational Resources Information Center

    Denham, Willard A.S.

    1964-01-01

    Findings of two recent surveys on safety equipment in laboratory facilities are presented. The first survey was a pilot study of emergency shower and eye wash equipment. This study was followed by a more comprehensive random survey of safety equipment in 2,820 labs. Among other findings, the surveys indicate that many plants are underequipped, or…

  18. NIH Standard. Animal Care Equipment.

    ERIC Educational Resources Information Center

    National Institutes of Health (DHEW), Bethesda, MD. Office of Administrative Management.

    The National Institutes of Health standardized animal care equipment is presented in this catalog. Each piece of equipment is illustrated and described in terms of overall dimensions, construction, and general usage. A price list is included to estimate costs in budgeting, planning, and requisitioning animal care equipment. The standards and…

  19. Decision Analysis for Equipment Selection

    ERIC Educational Resources Information Center

    Cilliers, J. J.

    2005-01-01

    Equipment selection during process design is a critical aspect of chemical engineering and requires engineering judgment and subjective analysis. When educating chemical engineering students in the selection of proprietary equipment during design, the focus is often on the types of equipment available and their operating characteristics. The…

  20. 40 CFR 264.114 - Disposal or decontamination of equipment, structures and soils.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... equipment, structures and soils. 264.114 Section 264.114 Protection of Environment ENVIRONMENTAL PROTECTION... of equipment, structures and soils. During the partial and final closure periods, all contaminated equipment, structures and soils must be properly disposed of or decontaminated unless otherwise specified...

  1. 40 CFR 265.114 - Disposal or decontamination of equipment, structures and soils.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... equipment, structures and soils. 265.114 Section 265.114 Protection of Environment ENVIRONMENTAL PROTECTION... decontamination of equipment, structures and soils. During the partial and final closure periods, all contaminated equipment, structures and soil must be properly disposed of, or decontaminated unless specified otherwise...

  2. 40 CFR 265.114 - Disposal or decontamination of equipment, structures and soils.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... equipment, structures and soils. 265.114 Section 265.114 Protection of Environment ENVIRONMENTAL PROTECTION... decontamination of equipment, structures and soils. During the partial and final closure periods, all contaminated equipment, structures and soil must be properly disposed of, or decontaminated unless specified otherwise...

  3. 40 CFR 265.114 - Disposal or decontamination of equipment, structures and soils.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... equipment, structures and soils. 265.114 Section 265.114 Protection of Environment ENVIRONMENTAL PROTECTION... decontamination of equipment, structures and soils. During the partial and final closure periods, all contaminated equipment, structures and soil must be properly disposed of, or decontaminated unless specified otherwise...

  4. 40 CFR 265.114 - Disposal or decontamination of equipment, structures and soils.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... equipment, structures and soils. 265.114 Section 265.114 Protection of Environment ENVIRONMENTAL PROTECTION... decontamination of equipment, structures and soils. During the partial and final closure periods, all contaminated equipment, structures and soil must be properly disposed of, or decontaminated unless specified otherwise...

  5. 40 CFR 264.114 - Disposal or decontamination of equipment, structures and soils.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... equipment, structures and soils. 264.114 Section 264.114 Protection of Environment ENVIRONMENTAL PROTECTION... of equipment, structures and soils. During the partial and final closure periods, all contaminated equipment, structures and soils must be properly disposed of or decontaminated unless otherwise specified...

  6. 40 CFR 264.114 - Disposal or decontamination of equipment, structures and soils.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... equipment, structures and soils. 264.114 Section 264.114 Protection of Environment ENVIRONMENTAL PROTECTION... of equipment, structures and soils. During the partial and final closure periods, all contaminated equipment, structures and soils must be properly disposed of or decontaminated unless otherwise specified...

  7. 40 CFR 264.114 - Disposal or decontamination of equipment, structures and soils.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... equipment, structures and soils. 264.114 Section 264.114 Protection of Environment ENVIRONMENTAL PROTECTION... of equipment, structures and soils. During the partial and final closure periods, all contaminated equipment, structures and soils must be properly disposed of or decontaminated unless otherwise specified...

  8. 40 CFR 265.114 - Disposal or decontamination of equipment, structures and soils.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... equipment, structures and soils. 265.114 Section 265.114 Protection of Environment ENVIRONMENTAL PROTECTION... decontamination of equipment, structures and soils. During the partial and final closure periods, all contaminated equipment, structures and soil must be properly disposed of, or decontaminated unless specified otherwise...

  9. 40 CFR 264.114 - Disposal or decontamination of equipment, structures and soils.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... equipment, structures and soils. 264.114 Section 264.114 Protection of Environment ENVIRONMENTAL PROTECTION... of equipment, structures and soils. During the partial and final closure periods, all contaminated equipment, structures and soils must be properly disposed of or decontaminated unless otherwise specified...

  10. Orbital construction support equipment

    NASA Technical Reports Server (NTRS)

    1977-01-01

    Approximately 200 separate construction steps were defined for the three solar power satellite (SPS) concepts. Detailed construction scenarios were developed which describe the specific tasks to be accomplished, and identify general equipment requirements. The scenarios were used to perform a functional analysis, which resulted in the definition of 100 distinct SPS elements. These elements are the components, parts, subsystems, or assemblies upon which construction activities take place. The major SPS elements for each configuration are shown. For those elements, 300 functional requirements were identified in seven generic processes. Cumulatively, these processes encompass all functions required during SPS construction/assembly. Individually each process is defined such that it includes a specific type of activity. Each SPS element may involve activities relating to any or all of the generic processes. The processes are listed, and examples of the requirements defined for a typical element are given.

  11. Final Report

    SciTech Connect

    Baumgardt, Frank

    2014-10-13

    The equipment developed under this grant provides a solution to convert thermal energy into electricity for heat sources such as geothermal heat or waste heat from industrial processes. In the course of this research effort we developed a series-counterflow configuration for multiple units to increase the efficiency of the conversion process.

  12. 40 CFR 1068.215 - What are the provisions for exempting manufacturer-owned engines/equipment?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... the final disposition of any engine/equipment removed from exempt status. (2) Let us access these... of the engine/equipment (as applicable), or whom to contact for further information. (iv) One...

  13. 76 FR 35006 - Recovery Policy RP9525.16, Research-Related Equipment and Furnishings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-15

    ... SECURITY Federal Emergency Management Agency Recovery Policy RP9525.16, Research-Related Equipment and... document provides notice of the availability of the final policy RP9525.16, Research-related Equipment and... comments on August 13, 2010. DATES: This policy is effective May 3, 2011. ADDRESSES: This final policy...

  14. Protection of Medical Equipment against Electromagnetic Pulse (EMP): phase I

    DTIC Science & Technology

    1986-06-12

    Sphygmomanometer 2.71 14. Angiographic Injection System 2.71 114. Automatic Digital 5lood Cell Counter 2.71 17. Electrolytic Solution Analyzer 2.83 17...TAD PROTECTION OF MEDICAL EQUIPMENT |. AGAINST ELECTROMAGENTIC PULSE (EMP): 0 PHASE I Final Report 12 June 1986 J. Klebers Supported by: U. S. ARMY...identify by block number) FIELD GROUP SUB-GROUjP Electromagentic Pulse, EMP, Medical Equipment, Nuclear 77 7 Hardlening, Stirvivabi IItty, VulnerabilityP

  15. Space station wardroom habitability and equipment study

    NASA Technical Reports Server (NTRS)

    Nixon, David; Miller, Christopher; Fauquet, Regis

    1989-01-01

    Experimental designs in life-size mock-up form for the wardroom facility for the Space Station Habitability Module are explored and developed. In Phase 1, three preliminary concepts for the wardroom configuration are fabricated and evaluated. In Phase 2, the results of Phase 1 are combined with a specific range of program design requirements to provide the design criteria for the fabrication of an innovative medium-fidelity mock-up of a wardrobe configuration. The study also focuses on the design and preliminary prototyping of selected equipment items including crew exercise compartments, a meal/meeting table and a portable workstation. Design criteria and requirements are discussed and documented. Preliminary and final mock-ups and equipment prototypes are described and illustrated.

  16. Equipment for large-scale mammalian cell culture.

    PubMed

    Ozturk, Sadettin S

    2014-01-01

    This chapter provides information on commonly used equipment in industrial mammalian cell culture, with an emphasis on bioreactors. The actual equipment used in the cell culture process can vary from one company to another, but the main steps remain the same. The process involves expansion of cells in seed train and inoculation train processes followed by cultivation of cells in a production bioreactor. Process and equipment options for each stage of the cell culture process are introduced and examples are provided. Finally, the use of disposables during seed train and cell culture production is discussed.

  17. Equipment design guidance document for flammable gas waste storage tank new equipment

    SciTech Connect

    Smet, D.B.

    1996-04-11

    This document is intended to be used as guidance for design engineers who are involved in design of new equipment slated for use in Flammable Gas Waste Storage Tanks. The purpose of this document is to provide design guidance for all new equipment intended for application into those Hanford storage tanks in which flammable gas controls are required to be addressed as part of the equipment design. These design criteria are to be used as guidance. The design of each specific piece of new equipment shall be required, as a minimum to be reviewed by qualified Unreviewed Safety Question evaluators as an integral part of the final design approval. Further Safety Assessment may be also needed. This guidance is intended to be used in conjunction with the Operating Specifications Documents (OSDs) established for defining work controls in the waste storage tanks. The criteria set forth should be reviewed for applicability if the equipment will be required to operate in locations containing unacceptable concentrations of flammable gas.

  18. Welding equipment for space applications

    NASA Astrophysics Data System (ADS)

    Dzhanibekov, V. A.; Zagrebel'Nyi, A. A.; Garvish, S. S.; Stesin, V. V.; Sheliagin, V. D.; Iurchenko, N. N.; Markov, A. V.

    A survey is presented of representative Soviet-period equipment for welding, brazing, coating, and cutting operations that are to be conducted in EVA and other microgravity/vacuum conditions by cosmonauts. Power-supply and process information-processing units are essential components of the 'Isparitel', 'Yantar', and hand-held 'Uri' equipment discussed; in addition, these welding equipment designs strove to achieve the greatest possible lightness, compactness, and energy efficiency. Accounts are given of cosmonaut EVA operational experience with the welding equipment presented.

  19. Orbiter electrical equipment utilization baseline

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The baseline for utilization of Orbiter electrical equipment in both electrical and Environmental Control and Life Support System (ECLSS) thermal analyses is established. It is a composite catalog of Space Shuttle equipment, as defined in the Shuttle Operational Data Book. The major functions and expected usage of each component type are described. Functional descriptions are designed to provide a fundamental understanding of the Orbiter electrical equipment, to insure correlation of equipment usage within nominal analyses, and to aid analysts in the formulation of off-nominal, contingency analyses.

  20. Information technology equipment cooling system

    DOEpatents

    Schultz, Mark D.

    2014-06-10

    According to one embodiment, a system for removing heat from a rack of information technology equipment may include a sidecar indoor air to liquid heat exchanger that cools warm air generated by the rack of information technology equipment. The system may also include a liquid to liquid heat exchanger and an outdoor heat exchanger. The system may further include configurable pathways to connect and control fluid flow through the sidecar heat exchanger, the liquid to liquid heat exchanger, the rack of information technology equipment, and the outdoor heat exchanger based upon ambient temperature and/or ambient humidity to remove heat from the rack of information technology equipment.

  1. Power Product Equipment Technician: Equipment Systems. Teacher Edition. Student Edition.

    ERIC Educational Resources Information Center

    Hilley, Robert

    This packet contains teacher and student editions on the topic of equipment systems, intended for the preparation of power product equipment technicians. This publication contains seven units: (1) principles of power transmission; (2) mechanical drive systems; (3) principles of fluid power; (4) hydraulic and pneumatic drive systems; (5) wheel and…

  2. Available Equipment in School Foodservice.

    ERIC Educational Resources Information Center

    Meyer, Mary Kay

    This report provides data on the National Food Service Management Institute's multi-year research project that identified type, style, age, and condition of available food service equipment in K-12 schools nationwide. The study found that smaller schools, serving less than 400 lunches per day, had kitchens equipped with ranges, small…

  3. Heavy Equipment Mechanic. Instructor Edition.

    ERIC Educational Resources Information Center

    Hendrix, Laborn J.; And Others

    This manual is intended to assist heavy equipment instructors in teaching the latest concepts and functions of heavy equipment. It includes 7 sections and 27 instructional units. Sections (and units) are: orientation (shop safety and first aid, hand tools and miscellaneous tools, measuring, basic rigging and hoisting), engines (basic engine…

  4. Heavy Equipment Mechanic Program Guide.

    ERIC Educational Resources Information Center

    Georgia Univ., Athens. Dept. of Vocational Education.

    Designed to train an entry-level mechanic, this heavy equipment mechanic program guide presents the standard curriculum for technical institutes in Georgia. The curriculum addresses the minimum competencies for a heavy equipment mechanic program. The general information section contains the following: purpose and objectives; program description,…

  5. Food Service Equipment and Appurtenances.

    ERIC Educational Resources Information Center

    National Sanitation Foundation, Ann Arbor, MI.

    Equipment design specifications are presented relating to tables of all kinds, counters, sinks and drainboards, bins, shelves, drawers, hoods and similar kitchen appurtenances, not including baking, roasting, toasting, broiling or frying equipment, food preparation machinery such as slicers, choppers, and cutters, mixers and grinders, steam…

  6. Final Technical Report

    SciTech Connect

    Maxwell, Mike, J., P.E.

    2012-08-30

    The STI product is the Final Technical Report from ReliOn, Inc. for contract award DE-EE0000487: Recovery Act PEM Fuel Cell Systems Providing Emergency Reserve and Backup Power. The program covered the turnkey deployment of 431 ReliOn fuel cell systems at 189 individual sites for AT&T and PG&E with ReliOn functioning as the primary equipment supplier and the project manager. The Final Technical Report provides an executive level summary, a comparison of the actual accomplishments vs. the goals and objectives of the project, as well as a summary of the project activity from the contract award date of August 1, 2009 through the contract expiration date of December 31, 2011. Two photos are included in the body of the report which show hydrogen storage and bulk hydrogen refueling technologies developed as a result of this program.

  7. Lunar surface mining equipment study

    NASA Astrophysics Data System (ADS)

    Podnieks, Egons R.; Siekmeier, John A.

    Results of a NASA-sponsored assessment of the various proposed lunar surface mining equipment concepts submitted to NASA are presented. The proposed equipment was reviewed and evaluated with due consideration of equipment design criteria, basic mining principles, and the lunar environment. On the basis of this assessment, two pieces of mining equipment were conceptualized for surface mining operations: the ripper-excavator-loader, also capable of operating as a load-haul-dump vehicle, and the haulage vehicle, capable of transporting feedstock from the pit, liquid oxygen containers from the processing plant, and materials during construction. Reliable and durable lunar mining equipment is found to be best developed by the evolution of proven terrestrial technology adapted to the lunar environment.

  8. Information technology equipment cooling method

    DOEpatents

    Schultz, Mark D.

    2015-10-20

    According to one embodiment, a system for removing heat from a rack of information technology equipment may include a sidecar indoor air to liquid heat exchanger that cools air utilized by the rack of information technology equipment to cool the rack of information technology equipment. The system may also include a liquid to liquid heat exchanger and an outdoor heat exchanger. The system may further include configurable pathways to connect and control fluid flow through the sidecar heat exchanger, the liquid to liquid heat exchanger, the rack of information technology equipment, and the outdoor heat exchanger based upon ambient temperature and/or ambient humidity to remove heat generated by the rack of information technology equipment.

  9. Final Report

    SciTech Connect

    Gurney, Kevin R.

    2015-01-12

    This document constitutes the final report under DOE grant DE-FG-08ER64649. The organization of this document is as follows: first, I will review the original scope of the proposed research. Second, I will present the current draft of a paper nearing submission to Nature Climate Change on the initial results of this funded effort. Finally, I will present the last phase of the research under this grant which has supported a Ph.D. student. To that end, I will present the graduate student’s proposed research, a portion of which is completed and reflected in the paper nearing submission. This final work phase will be completed in the next 12 months. This final workphase will likely result in 1-2 additional publications and we consider the results (as exemplified by the current paper) high quality. The continuing results will acknowledge the funding provided by DOE grant DE-FG-08ER64649.

  10. Final Report

    SciTech Connect

    DeTar, Carleton

    2012-12-10

    This document constitutes the Final Report for award DE-FC02-06ER41446 as required by the Office of Science. It summarizes accomplishments and provides copies of scientific publications with significant contribution from this award.

  11. TRANSPORT AND EMPLACEMENT EQUIPMENT DESCRIPTIONS

    SciTech Connect

    NA

    1997-09-29

    The objective and the scope of this document are to list and briefly describe the major mobile equipment necessary for waste package (WP) Transport and Emplacement in the proposed subsurface nuclear waste repository at Yucca Mountain. Primary performance characteristics and some specialized design features of the equipment are explained and summarized in the individual subsections of this document. The Transport and Emplacement equipment described in this document consists of the following: (1) WP Transporter; (2) Reusable Rail Car; (3) Emplacement Gantry; (4) Gantry Carrier; and (5) Transport Locomotive.

  12. Research on Computer Aided Innovation Model of Weapon Equipment Requirement Demonstration

    NASA Astrophysics Data System (ADS)

    Li, Yong; Guo, Qisheng; Wang, Rui; Li, Liang

    Firstly, in order to overcome the shortcoming of using only AD or TRIZ solely, and solve the problems currently existed in weapon equipment requirement demonstration, the paper construct the method system of weapon equipment requirement demonstration combining QFD, AD, TRIZ, FA. Then, we construct a CAI model frame of weapon equipment requirement demonstration, which include requirement decomposed model, requirement mapping model and requirement plan optimization model. Finally, we construct the computer aided innovation model of weapon equipment requirement demonstration, and developed CAI software of equipment requirement demonstration.

  13. Electricity used by office equipment and network equipment in the U.S.: Detailed report and appendices

    SciTech Connect

    Kawamoto, Kaoru; Koomey, Jonathan G.; Nordman, Bruce; Brown, Richard E.; Piette, Mary Ann; Ting, Michael; Meier, Alan K.

    2001-02-01

    In spite of the recent explosive growth in the use of office and network equipment, there has been no recent study that estimates in detail how much electricity is consumed by that equipment in the United States. In this study, we examined energy use by office equipment and network equipment at the end of 1999. We classified office equipment into 11 types; for each type we estimated annual energy consumption for residential, commercial, and industrial use by combining estimates of stock, power requirements, usage, and saturation of power management. We also classified network equipment into six types and estimated the annual energy consumption for each type. We found that total direct power use by office and network equipment is about 74 TWh per year, which is about 2% of total electricity use in the U.S. When electricity used by telecommunications equipment and electronics manufacturing is included, that figure rises to 3% of all electricity use (Koomey 2000). More than 70% of the 74 TWh/year is dedicated to office equipment for commercial use. We also found that power management currently saves 23 TWh/year, and complete saturation and proper functioning of power management would achieve additional savings of 17 TWh/year. Furthermore, complete saturation of night shutdown for equipment not required to operate at night would reduce power use by an additional 7 TWh/year. Finally, we compared our current estimater with our 1995 forecast for 1999. We found that the total difference between our current estimate and the previous forecast is less than 15% and identified the factors that led to inaccuracies in the previous forecast. We also conducted a sensitivity analysis of the uncertainties in our current forecast and identified the data sets that have the largest impact on our current estimate of energy use.

  14. Heavy Equipment Mechanic Program Standards.

    ERIC Educational Resources Information Center

    Georgia Univ., Athens. Dept. of Vocational Education.

    This publication contains statewide standards for the heavy equipment mechanic program in Georgia. The standards are divided into 12 categories: foundations (philosophy, purpose, goals, program objectives, availability, evaluation); admissions (admission requirements, provisional admission requirements, recruitment, evaluation and planning);…

  15. Water-Using Equipment: Domestic

    SciTech Connect

    Solana, Amy E.; Mcmordie, Katherine

    2006-01-24

    Water management is an important aspect of energy engineering. This article addresses water-using equipment primarily used for household purposes, including faucets, showers, toilets, urinals, dishwashers, and clothes washers, and focuses on how the equipment can be optimized to save both water and energy. Technology retrofits and operation and maintenance changes are the primary methods discussed for water and energy conservation. Auditing to determine current consumption rates is also described for each technology.

  16. 14 CFR 121.345 - Radio equipment.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Radio equipment. 121.345 Section 121.345..., FLAG, AND SUPPLEMENTAL OPERATIONS Instrument and Equipment Requirements § 121.345 Radio equipment. (a) No person may operate an airplane unless it is equipped with radio equipment required for the kind...

  17. 14 CFR 121.345 - Radio equipment.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Radio equipment. 121.345 Section 121.345..., FLAG, AND SUPPLEMENTAL OPERATIONS Instrument and Equipment Requirements § 121.345 Radio equipment. (a) No person may operate an airplane unless it is equipped with radio equipment required for the kind...

  18. 14 CFR 121.345 - Radio equipment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Radio equipment. 121.345 Section 121.345..., FLAG, AND SUPPLEMENTAL OPERATIONS Instrument and Equipment Requirements § 121.345 Radio equipment. (a) No person may operate an airplane unless it is equipped with radio equipment required for the kind...

  19. 14 CFR 121.345 - Radio equipment.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Radio equipment. 121.345 Section 121.345..., FLAG, AND SUPPLEMENTAL OPERATIONS Instrument and Equipment Requirements § 121.345 Radio equipment. (a) No person may operate an airplane unless it is equipped with radio equipment required for the kind...

  20. 14 CFR 121.345 - Radio equipment.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Radio equipment. 121.345 Section 121.345..., FLAG, AND SUPPLEMENTAL OPERATIONS Instrument and Equipment Requirements § 121.345 Radio equipment. (a) No person may operate an airplane unless it is equipped with radio equipment required for the kind...

  1. Equipment Efficiency for Healthy School Meals. [Videotape].

    ERIC Educational Resources Information Center

    National Food Service Management Inst., University, MS.

    A satellite seminar on large-scale food production equipment discusses ways child nutrition personnel can maximize use of existing equipment, considers research related to use of existing equipment, explains plan reviews for equipment selection and purchase, and explores new equipment options. Examples illustrate use of planning or modernizing…

  2. 1968 Listing of Swimming Pool Equipment.

    ERIC Educational Resources Information Center

    National Sanitation Foundation, Ann Arbor, MI. Testing Lab.

    An up-to-date listing of swimming pool equipment including--(1) companies authorized to display the National Sanitation Foundation seal of approval, (2) equipment listed as meeting NSF swimming pool equipment standards relating to diatomite type filters, (3) equipment listed as meeting NSF swimming pool equipment standard relating to sand type…

  3. 40 CFR 63.771 - Control equipment requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... flame zone of the boiler or process heater. (ii) A vapor recovery device (e.g., carbon adsorption system... in a thermal treatment unit for which the owner or operator has been issued a final permit under 40... reactivated in a thermal treatment unit equipped with and operating air emission controls in accordance...

  4. 40 CFR 63.771 - Control equipment requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... flame zone of the boiler or process heater. (ii) A vapor recovery device (e.g., carbon adsorption system... in a thermal treatment unit for which the owner or operator has been issued a final permit under 40... reactivated in a thermal treatment unit equipped with and operating air emission controls in accordance...

  5. VIEW OF INTEGRITY TESTING EQUIPMENT UTILIZING CRYOGENIC BATHS IN BUILDING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW OF INTEGRITY TESTING EQUIPMENT UTILIZING CRYOGENIC BATHS IN BUILDING 991. (6/7/68) - Rocky Flats Plant, Final Assembly & Shipping, Eastern portion of plant site, south of Spruce Avenue, east of Tenth Street & north of Central Avenue, Golden, Jefferson County, CO

  6. 7 CFR 58.128 - Equipment and utensils.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... the manufacturer. They should be equipped with proper temperature controls on the wash and rinse tanks... temperature of the wash and final rinse solution should be automatically controlled and not exceed 140 °F. (d... glasses, if used, shall be sound, clear, and in good repair. Vats which have hinged covers shall be...

  7. 7 CFR 58.128 - Equipment and utensils.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... the manufacturer. They should be equipped with proper temperature controls on the wash and rinse tanks... temperature of the wash and final rinse solution should be automatically controlled and not exceed 140 °F. (d... glasses, if used, shall be sound, clear, and in good repair. Vats which have hinged covers shall be...

  8. 11. DETAILED VIEW OF LATHE EQUIPMENT. LATHES WERE USED TO ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. DETAILED VIEW OF LATHE EQUIPMENT. LATHES WERE USED TO FORM THE FINAL SHAPE OF THE FIRST TRIGGER DESIGN. (4/4/66) - Rocky Flats Plant, General Manufacturing, Support, Records-Central Computing, Southern portion of Plant, Golden, Jefferson County, CO

  9. Postoutbreak disinfection of mobile equipment.

    PubMed

    Alphin, R L; Ciaverelli, C D; Hougentogler, D P; Johnson, K J; Rankin, M K; Benson, E R

    2010-03-01

    Current control strategies for avian influenza virus, exotic Newcastle disease, and other highly contagious poultry diseases include surveillance, quarantine, depopulation, disposal, and decontamination. Skid steer loaders and other mobile equipment are extensively used during depopulation and disposal. Movement of contaminated equipment has been implicated in the spread of disease in previous outbreaks. One approach to equipment decontamination is to power wash the equipment, treat with a liquid disinfectant, change any removable filters, and let it sit idle for several days. In this project, multiple disinfectant strategies were individually evaluated for their effectiveness at inactivating Newcastle disease virus (NDV) on mechanical equipment seeded with the virus. A small gasoline engine was used to simulate typical mechanical equipment. A high titer of LaSota strain, NDV was applied and dried onto a series of metal coupons. The coupons were then placed on both interior and exterior surfaces of the engine. Liquid disinfectants that had been effective in the laboratory were not as effective at disinfecting the engine under field conditions. Indirect thermal fog showed a decrease in overall virus titer or strength. Direct thermal fog was more effective than liquid spray application or indirect thermal fog application.

  10. Medical equipment leasing. Benefits and opportunities.

    PubMed

    Hill, R

    1995-03-01

    Medical equipment manufacturers throughout Europe now have the opportunity to take advantage of changes in the United Kingdom Treasury rules, which introduce flexibility into hospital financing. This could result in more equipment sales for manufacturers and better equipped hospitals.

  11. Medical Equipment at Home After the NICU

    MedlinePlus

    ... Medical equipment at home after the NICU Medical equipment at home after the NICU E-mail to ... care unit (NICU) don’t need special medical equipment, like monitors or feeding tubes, when they leave ...

  12. 49 CFR 195.430 - Firefighting equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... PIPELINE Operation and Maintenance § 195.430 Firefighting equipment. Each operator shall maintain adequate firefighting equipment at each pump station and breakout tank area. The equipment must be— (a) In...

  13. 49 CFR 195.430 - Firefighting equipment.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... PIPELINE Operation and Maintenance § 195.430 Firefighting equipment. Each operator shall maintain adequate firefighting equipment at each pump station and breakout tank area. The equipment must be— (a) In...

  14. 49 CFR 195.430 - Firefighting equipment.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... PIPELINE Operation and Maintenance § 195.430 Firefighting equipment. Each operator shall maintain adequate firefighting equipment at each pump station and breakout tank area. The equipment must be— (a) In...

  15. 49 CFR 195.430 - Firefighting equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... PIPELINE Operation and Maintenance § 195.430 Firefighting equipment. Each operator shall maintain adequate firefighting equipment at each pump station and breakout tank area. The equipment must be— (a) In...

  16. Final Report

    SciTech Connect

    Marchant, Gary E.

    2013-04-23

    This is the final report of a two year project entitled "Governing Nanotechnology Risks and Benefits in the Transition to Regulation: Innovative Public and Private Approaches." This project examined the role of new governance or "soft law" mechanisms such as codes of conduct, voluntary programs and partnership agreements to manage the risks of emerging technologies such as nanotechnology. A series of published or in publication papers and book chapters are attached.

  17. Final Report

    SciTech Connect

    R. Paul Drake

    2001-11-30

    This final report describes work involving 22 investigators from 11 institutions to explore the dynamics present in supernova explosions by means of experiments on the Omega laser. The specific experiments emphasized involved the unstable expansion of a spherical capsule and the coupling of perturbations at a first interface to a second interface by means of a strong shock. Both effects are present in supernovae. The experiments were performed at Omega and the computer simulations were undertaken at several institutions. B139

  18. Final Report

    SciTech Connect

    Stinis, Panos

    2016-08-07

    This is the final report for the work conducted at the University of Minnesota (during the period 12/01/12-09/18/14) by PI Panos Stinis as part of the "Collaboratory on Mathematics for Mesoscopic Modeling of Materials" (CM4). CM4 is a multi-institution DOE-funded project whose aim is to conduct basic and applied research in the emerging field of mesoscopic modeling of materials.

  19. 78 FR 21938 - Final National Pollutant Discharge Elimination System (NPDES) General Permit for Discharges...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-12

    ... equipment; users of products that are pre- lubricated (e.g., wire ropes) have no available alternatives..., even though the final permit requires that wire ropes or cables and other equipment must be...

  20. Equipping the Open-Plan School, Equipping for Open Education.

    ERIC Educational Resources Information Center

    Lassiter, Frank

    The performance specifications of furniture and equipment for open education and open-plan schools differ from conventional classroom furniture in that it must be easily moved, have a range of dimensions, contain multipurpose interchangeable components, and be designed to accommodate a variety of student/teacher uses. The author suggests some…

  1. Power Product Equipment Technician: Construction Equipment. Teacher Edition. Student Edition.

    ERIC Educational Resources Information Center

    Hilley, Robert

    The instructor's guide in this package, which is one in a series of new publications developed to replace the Multistate Academic and Vocational Curriculum Consortium's previous small-engine curricula, contains the materials required to teach a competency-based course in repairing construction equipment. The guide begins with an introduction…

  2. Heavy Equipment Operator: General Equipment Operator. Instructional Materials.

    ERIC Educational Resources Information Center

    Hendrix, Laborn J.; Sawatzky, Joyce

    Developed through close coordination between contractors, construction workers, and vocational educators, this instructor's manual is designed to help heavy equipment instructors present materials in a systematic format. The instructional materials in the manual are written in terms of student performance, using measurable behavioral objectives.…

  3. Military GPS User Equipment (MGUE)

    DTIC Science & Technology

    2015-04-29

    Space and Missile Systems Center Military GPS User Equipment (MGUE) Lt Col James “Mutt” Wilson Program Manager 29 Apr 15 Information contained in...SUBTITLE Military GPS User Equipment (MGUE) 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK...RESPONSIBLE PERSON a REPORT unclassified b ABSTRACT unclassified c THIS PAGE unclassified Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18

  4. Leasing equipment minimizes capital investment.

    PubMed

    Zimmerman, M E; Maier, R A

    1989-03-01

    As consumers continue to demand the most advanced technology at the lowest cost, healthcare organizations are turning to leasing as a way of acquiring equipment with a minimum amount of capital investment. Institutions considering leasing should determine their balance sheet constraints, compare the relative costs of debt financing and leasing, and assess the residual value of the equipment at the end of its use. Comparing potential lessors requires careful analysis of rate structures and the capability of the companies to commit to a contract promptly.

  5. Steps of Reprocessing and Equipments

    PubMed Central

    Lee, Yong Kook

    2013-01-01

    With the increasing interest in endoscopy and the rising number of endoscopic examinations in hospitals, the importance of endoscopic reprocessing is also increasing. Cure facilities that are understaffed and ill-equipped are trying to cope with the problems of insufficient cleaning and high infection risks. To prevent endoscopy-associated infection, the endoscope cleaning, and disinfection guidelines prepared by the Korean Society of Gastrointestinal Endoscopy must be followed. In this review, the steps of endoscopic reprocessing and the equipments required in each step are discussed. PMID:23767039

  6. Advanced deep sea diving equipment

    NASA Technical Reports Server (NTRS)

    Danesi, W. A.

    1972-01-01

    Design requirements are generated for a deep sea heavy duty diving system to equip salvage divers with equipment and tools that permit work of the same quality and in times approaching that done on the surface. The system consists of a helmet, a recirculator for removing carbon dioxide, and the diver's dress. The diver controls the inlet flow by the recirculatory control valve and is able to change closed cycle operation to open cycle if malfunction occurs. Proper function of the scrubber in the recirculator minimizes temperature and humidity effects as it filters the returning air.

  7. Robot Would Reconfigure Modular Equipment

    NASA Technical Reports Server (NTRS)

    Purves, Lloyd R.

    1993-01-01

    Special-purpose sets of equipment, packaged in identical modules with identical interconnecting mechanisms, attached to or detached from each other by specially designed robot, according to proposal. Two-arm walking robot connects and disconnects modules, operating either autonomously or under remote supervision. Robot walks along row of connected modules by grasping successive attachment subassemblies in hand-over-hand motion. Intended application for facility or station in outer space; robot reconfiguration scheme makes it unnecessary for astronauts to venture outside spacecraft or space station. Concept proves useful on Earth in assembly, disassembly, or reconfiguration of equipment in such hostile environments as underwater, near active volcanoes, or in industrial process streams.

  8. 78 FR 24061 - Minimum Technical Standards for Class II Gaming Systems and Equipment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-24

    ... for Class II gaming systems and equipment to harmonize the charitable gaming exemption amount in the technical standards with the charitable gaming exemption amount in its Class II minimum internal control... Gaming Systems and Equipment AGENCY: National Indian Gaming Commission. ACTION: Final rule. SUMMARY:...

  9. 40 CFR 267.116 - What must I do with contaminated equipment, structure, and soils?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... equipment, structure, and soils? 267.116 Section 267.116 Protection of Environment ENVIRONMENTAL PROTECTION..., structure, and soils? You must properly dispose of or decontaminate all contaminated equipment, structures, and soils during the partial and final closure periods. By removing any hazardous wastes or...

  10. 40 CFR 267.116 - What must I do with contaminated equipment, structure, and soils?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... equipment, structure, and soils? 267.116 Section 267.116 Protection of Environment ENVIRONMENTAL PROTECTION..., structure, and soils? You must properly dispose of or decontaminate all contaminated equipment, structures, and soils during the partial and final closure periods. By removing any hazardous wastes or...

  11. 40 CFR 267.116 - What must I do with contaminated equipment, structure, and soils?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... equipment, structure, and soils? 267.116 Section 267.116 Protection of Environment ENVIRONMENTAL PROTECTION..., structure, and soils? You must properly dispose of or decontaminate all contaminated equipment, structures, and soils during the partial and final closure periods. By removing any hazardous wastes or...

  12. 40 CFR 267.116 - What must I do with contaminated equipment, structure, and soils?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... equipment, structure, and soils? 267.116 Section 267.116 Protection of Environment ENVIRONMENTAL PROTECTION..., structure, and soils? You must properly dispose of or decontaminate all contaminated equipment, structures, and soils during the partial and final closure periods. By removing any hazardous wastes or...

  13. 40 CFR 267.116 - What must I do with contaminated equipment, structure, and soils?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... equipment, structure, and soils? 267.116 Section 267.116 Protection of Environment ENVIRONMENTAL PROTECTION..., structure, and soils? You must properly dispose of or decontaminate all contaminated equipment, structures, and soils during the partial and final closure periods. By removing any hazardous wastes or...

  14. 76 FR 71835 - Energy Conservation Program: Energy Conservation Standards for Direct Heating Equipment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-18

    ... viewing pane) or a sealed system, they do not provide the same heating function as gas fireplaces, gas... Conservation Standards for Direct Heating Equipment; Final Rule #0;#0;Federal Register / Vol. 76 , No. 223...-AC56 Energy Conservation Program: Energy Conservation Standards for Direct Heating Equipment...

  15. Final Report

    SciTech Connect

    R Paul Drake

    2004-01-12

    OAK-B135 This is the final report from the project Hydrodynamics by High-Energy-Density Plasma Flow and Hydrodynamics and Radiation Hydrodynamics with Astrophysical Applications. This project supported a group at the University of Michigan in the invention, design, performance, and analysis of experiments using high-energy-density research facilities. The experiments explored compressible nonlinear hydrodynamics, in particular at decelerating interfaces, and the radiation hydrodynamics of strong shock waves. It has application to supernovae, astrophysical jets, shock-cloud interactions, and radiative shock waves.

  16. Equipment for the Characterization of Synthetic Bio-hybrid Polymers and Micellar Nanoparticles for Stimuli Responsive Materials

    DTIC Science & Technology

    2015-02-08

    UU UU UU 08-02-2015 1-Aug-2013 31-Jul-2014 Approved for Public Release; Distribution Unlimited Final Report: Equipment For the Characterization of...peer-reviewed journals: Number of Papers published in non peer-reviewed journals: Final Report: Equipment For the Characterization of Synthetic Bio...Equivalent: Total Number: ...... ...... Inventions (DD882) Scientific Progress The equipment grant was structured based on projects recently funded by the

  17. The SLAC Comparator for the Calibration of Digital Leveling Equipment

    SciTech Connect

    Gassner, G.L.; Ruland, R.E.; /SLAC

    2006-11-07

    At SLAC digital levels are used for precise leveling, both for setting out and monitoring. A very high precision of 30 {micro}m is required, which can only be achieved by regularly calibrating the leveling equipment. The calibration facility is also used for detailed investigations to refine the SLAC leveling procedure. In this paper the setup of the SLAC vertical comparator is described. In order to also perform traditional staff calibration a CCD camera was integrated into the SLAC comparator. Finally an overview of further investigations of our leveling equipment is presented.

  18. Navigation and vessel inspection circular No. 1-81. Guidance for enforcement of the requirements of the Port and Tanker Safety Act of 1978 (PTSA) pertaining to SBT, CBT, COW, IGS, steering gear, and navigation equipment for tank vessels. Final report

    SciTech Connect

    1981-02-18

    The purpose of this NVC and its enclosures is to provide guidance and information pertaining to: Enforcement of the Requirements of the Port and Tanker Safety Act of 1978 (PTSA) Pertaining to SBT, CBT, COW systems, IGS, Steering Gear, and Navigation Equipment for Tank Vessels.

  19. Final Report

    SciTech Connect

    Sujit Banerjee

    2005-12-15

    Contaminants present in paper recycling mills can degrade product properties and can also lead to substantial downtime. Of these, adhesive material such as hot melts and pressure sensitive adhesives are especially troublesome. These are known as “ stickies ” and their handling and re- moval requires process equipment such as screens and cleaners as well as chemical additives. In the preceding phase of the project we demonstrated that firing an underwater spark in a tank of stock reduces the tack of the stickies and reduces their impact. The present phase was to demon- strate the technology in full-scale trials, address any issues that might arise, and commercialize the process. Trials were run at the Appleton papers mill in West Carrollton, OH, the Graphics Packag- ing mill at Kalamazoo, MI, Stora Enso mills at Duluth, MN, and Wisconsin Rapids, WI, and the Jackson Paper mill at Sylva, NC. It was shown that the sparker not only detackified stickies but also increased the efficiency of their removal by centrifugal cleaners, improved the effectiveness of dissolved air flotation, and increased the efficiency of flotation deinking. It is estimated that the sparker improves the efficiency of hydrocyclone cleaner, deinking cells and dissolved and dispersed air flotation units by 10-15%. This translates to a corresponding energy benefit in operating these units. The technology has been licensed to Eka Chemicals, a division of Akzo Nobel.

  20. Field power measurements of imaging equipment

    SciTech Connect

    McWhinney, Marla; Homan, Gregory; Brown, Richard; Roberson, Judy; Nordman, Bruce; Busch, John

    2004-05-14

    According to the U.S. Department of Energy, electricity use by non-PC commercial office equipment is growing at an annual rate of nearly 5 percent (AEO 2003). To help address this growth in consumption, U.S. EPA periodically updates its ENERGY STAR specifications as products and markets change. This report presents background research conducted to help EPA update the ENERGY STAR specification for imaging equipment, which covers printers, fax machines, copiers, scanners, and multifunction devices (MFDs). We first estimated the market impact of the current ENERGY STAR imaging specification, finding over 90 percent of the current market complies with the specification. We then analyzed a sample of typical new imaging products, including 11 faxes, 57 printers and 19 copiers/MFD. For these devices we metered power levels in the most common modes: active/ready/sleep/off, and recorded features that would most likely affect energy consumption. Our metering indicates that for many products and speed bins, current models consume substantially less power than the current specification. We also found that for all product categories, power consumption varied most considerably across technology (i.e. inkjet vs. laser). Although inkjet printers consumed less energy than laser printers in active, ready and sleep-mode, they consumed more power on average while off, mostly due to the use of external power supplies. Based on these findings, we developed strategies for the ENERGY STAR program to achieve additional energy reductions. Finally, we present an assessment of manufacturer's ENERGY STAR labeling practices.

  1. Equipment

    ERIC Educational Resources Information Center

    Education in Chemistry, 1976

    1976-01-01

    Described are a number of publications and items for use in chemistry. Included are brief descriptions of actuators, thermometer strips, current balances, and a variety of catalogues and other publications. (RH)

  2. Housing, Home Furnishings, and Equipment.

    ERIC Educational Resources Information Center

    Texas Tech Univ., Lubbock. Home Economics Curriculum Center.

    Designed for use in consumer and homemaking education in Texas, this curriculum guide is on the subject of housing, home furnishings, and equipment. An introduction to the guide, covering its use and program and curriculum planning, provides a list of suggested readings. Information on teaching handicapped and disadvantaged students follows. The…

  3. Strategy Guideline. HVAC Equipment Sizing

    SciTech Connect

    Burdick, Arlan

    2012-02-01

    This guide describes the equipment selection of a split system air conditioner and furnace for an example house in Chicago, IL as well as a heat pump system for an example house in Orlando, FL. The required heating and cooling load information for the two example houses was developed in the Department of Energy Building America Strategy Guideline: Accurate Heating and Cooling Load Calculations.

  4. Multimedia Equipment for Distance Education.

    ERIC Educational Resources Information Center

    Schiller, Scott S.

    1993-01-01

    Discusses the use of multimedia equipment for distance education. Topics addressed include use of the Internet; distance learning for educators; and cable television and/or fiber optics, including interactive television and satellite technology. A sidebar lists online and telecommunications providers. (LRW)

  5. Television Equipment Specialist (AFSC 30455).

    ERIC Educational Resources Information Center

    Green, James S.; And Others

    This document contains the six volumes of an Air Force correspondence course in television equipment repair. Each volume consists of student learning objectives, information, exercises, answers to exercises, and in some volumes, review modules on related topics. A volume review exercise is included for each volume. The first volume provides…

  6. Computer Equipment Repair Curriculum Guide.

    ERIC Educational Resources Information Center

    Reneau, Fred; And Others

    This guide is intended for use in a course to train students to repair computer equipment and perform related administrative and customer service tasks. Addressed in the individual units are the following topics (with selected subtopics in brackets): performing administrative functions (preparing service bills, maintaining accounts and labor…

  7. Preventive Maintenance Handbook. Audiovisual Equipment.

    ERIC Educational Resources Information Center

    Educational Products Information Exchange Inst., Stony Brook, NY.

    The preventive maintenance system for audiovisual equipment presented in this handbook is designed by specialists so that it can be used by nonspecialists in school sites. The report offers specific advice on saftey factors and also lists major problems that should not be handled by nonspecialists. Other aspects of a preventive maintenance system…

  8. Using Gaming Equipment to Teach

    ERIC Educational Resources Information Center

    Curriculum Review, 2009

    2009-01-01

    Gaming equipment (such as Nintendo's Wii[TM]) is making its way to schools and classrooms. However, most of the discussion regarding how to use this technology and integrate it into lesson plans is happening in blogs on the Internet. An advocate of interactive media in the classroom, Dr. Dawn Hawkins, a faculty member for the Art Institute of…

  9. Lawn and Garden Equipment Repair.

    ERIC Educational Resources Information Center

    Hardway, Jack; And Others

    This publication is designed to supplement the Comprehensive Small Engine Rapair guide by covering in detail all aspects of lawn and garden equipment repair not included in general engine repair or the repair of other small engines. It consists of instructional materials for both teachers and students, written in terms of student performance using…

  10. 21 CFR 58.61 - Equipment design.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 1 2012-04-01 2012-04-01 false Equipment design. 58.61 Section 58.61 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL GOOD LABORATORY PRACTICE FOR NONCLINICAL LABORATORY STUDIES Equipment § 58.61 Equipment design. Equipment used in...

  11. 21 CFR 58.61 - Equipment design.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 1 2014-04-01 2014-04-01 false Equipment design. 58.61 Section 58.61 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL GOOD LABORATORY PRACTICE FOR NONCLINICAL LABORATORY STUDIES Equipment § 58.61 Equipment design. Equipment used in...

  12. 21 CFR 58.61 - Equipment design.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 1 2013-04-01 2013-04-01 false Equipment design. 58.61 Section 58.61 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL GOOD LABORATORY PRACTICE FOR NONCLINICAL LABORATORY STUDIES Equipment § 58.61 Equipment design. Equipment used in...

  13. 21 CFR 58.61 - Equipment design.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 1 2011-04-01 2011-04-01 false Equipment design. 58.61 Section 58.61 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL GOOD LABORATORY PRACTICE FOR NONCLINICAL LABORATORY STUDIES Equipment § 58.61 Equipment design. Equipment used in...

  14. 21 CFR 58.61 - Equipment design.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 1 2010-04-01 2010-04-01 false Equipment design. 58.61 Section 58.61 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL GOOD LABORATORY PRACTICE FOR NONCLINICAL LABORATORY STUDIES Equipment § 58.61 Equipment design. Equipment used in...

  15. 14 CFR 23.1561 - Safety equipment.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Safety equipment. 23.1561 Section 23.1561... Markings and Placards § 23.1561 Safety equipment. (a) Safety equipment must be plainly marked as to method of operation. (b) Stowage provisions for required safety equipment must be marked for the benefit...

  16. 14 CFR 23.1561 - Safety equipment.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Safety equipment. 23.1561 Section 23.1561... Markings and Placards § 23.1561 Safety equipment. (a) Safety equipment must be plainly marked as to method of operation. (b) Stowage provisions for required safety equipment must be marked for the benefit...

  17. 14 CFR 23.1561 - Safety equipment.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Safety equipment. 23.1561 Section 23.1561... Markings and Placards § 23.1561 Safety equipment. (a) Safety equipment must be plainly marked as to method of operation. (b) Stowage provisions for required safety equipment must be marked for the benefit...

  18. 14 CFR 23.1561 - Safety equipment.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Safety equipment. 23.1561 Section 23.1561... Markings and Placards § 23.1561 Safety equipment. (a) Safety equipment must be plainly marked as to method of operation. (b) Stowage provisions for required safety equipment must be marked for the benefit...

  19. 14 CFR 23.1561 - Safety equipment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Safety equipment. 23.1561 Section 23.1561... Markings and Placards § 23.1561 Safety equipment. (a) Safety equipment must be plainly marked as to method of operation. (b) Stowage provisions for required safety equipment must be marked for the benefit...

  20. The Cost of Maintaining Educational Communications Equipment.

    ERIC Educational Resources Information Center

    Humphrey, David A.

    Tentative formulas for calculating the cost of maintaining educational communications equipment are proposed. The formulas are based on a survey of campuses of the State University of New York. The survey analyzed the types of equipment to be maintained, types of maintenance, who uses the equipment, who services the equipment, and the cost…

  1. 7 CFR 58.626 - Packaging equipment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Packaging equipment. 58.626 Section 58.626 Agriculture....626 Packaging equipment. Packaging equipment designed to mechanically fill and close single service... Standards for Equipment for Packaging Frozen Desserts and Cottage Cheese. Quality Specifications for...

  2. 46 CFR 197.460 - Diving equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Diving equipment. 197.460 Section 197.460 Shipping COAST... GENERAL PROVISIONS Commercial Diving Operations Periodic Tests and Inspections of Diving Equipment § 197.460 Diving equipment. The diving supervisor shall insure that the diving equipment designated for...

  3. 14 CFR 25.1431 - Electronic equipment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Electronic equipment. 25.1431 Section 25... AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Equipment Miscellaneous Equipment § 25.1431 Electronic equipment. (a) In showing compliance with § 25.1309 (a) and (b) with respect to radio and...

  4. 14 CFR 23.1431 - Electronic equipment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Electronic equipment. 23.1431 Section 23... Equipment § 23.1431 Electronic equipment. (a) In showing compliance with § 23.1309(b)(1) and (2) with respect to radio and electronic equipment and their installations, critical environmental conditions...

  5. Energy-related laboratory equipment (ERLE) guidelines

    SciTech Connect

    Not Available

    1995-01-01

    This document describes the Used Energy-Related Laboratory Equipment grants, and eligibility and procedures for participation. The document contains tables identifying typical equipment that may be requested, where to review ERLE equipment lists, and where to mail applications, a description of the eligible equipment grants access data system, and a copy of the ERLE grant application and instructions for its completion and submission.

  6. 47 CFR 74.550 - Equipment authorization.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 4 2011-10-01 2011-10-01 false Equipment authorization. 74.550 Section 74.550... § 74.550 Equipment authorization. Each authorization for aural broadcast STL, ICR, and booster stations shall require the use of equipment which has been certificated or verified. Equipment which has not...

  7. 47 CFR 74.852 - Equipment changes.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 4 2011-10-01 2011-10-01 false Equipment changes. 74.852 Section 74.852... Equipment changes. (a) The licensee of a low power auxiliary station may make any changes in the equipment that are deemed desirable or necessary, including replacement with certificated equipment,...

  8. 45 CFR 2543.34 - Equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 4 2011-10-01 2011-10-01 false Equipment. 2543.34 Section 2543.34 Public Welfare... Requirements Property Standards § 2543.34 Equipment. (a) Title to equipment acquired by a recipient with... not use equipment acquired with Federal funds to provide services to non-Federal outside...

  9. 45 CFR 74.34 - Equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Equipment. 74.34 Section 74.34 Public Welfare... COMMERCIAL ORGANIZATIONS Post-Award Requirements Property Standards § 74.34 Equipment. (a) Title to equipment... section. (b)(1) The recipient shall not use equipment acquired with HHS funds to provide services to...

  10. 14 CFR 23.1431 - Electronic equipment.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Electronic equipment. 23.1431 Section 23... Equipment § 23.1431 Electronic equipment. (a) In showing compliance with § 23.1309(b)(1) and (2) with respect to radio and electronic equipment and their installations, critical environmental conditions...

  11. 14 CFR 25.1431 - Electronic equipment.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Electronic equipment. 25.1431 Section 25... AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Equipment Miscellaneous Equipment § 25.1431 Electronic equipment. (a) In showing compliance with § 25.1309 (a) and (b) with respect to radio and...

  12. 29 CFR 1926.952 - Mechanical equipment.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 8 2013-07-01 2013-07-01 false Mechanical equipment. 1926.952 Section 1926.952 Labor... Mechanical equipment. (a) General. (1) Visual inspections shall be made of the equipment to determine that it... certified for work on the proper voltage, mechanical equipment shall not be operated closer to any...

  13. 29 CFR 1926.952 - Mechanical equipment.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 8 2011-07-01 2011-07-01 false Mechanical equipment. 1926.952 Section 1926.952 Labor... Mechanical equipment. (a) General. (1) Visual inspections shall be made of the equipment to determine that it.... (3) With the exception of equipment certified for work on the proper voltage, mechanical...

  14. 29 CFR 1926.952 - Mechanical equipment.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 8 2012-07-01 2012-07-01 false Mechanical equipment. 1926.952 Section 1926.952 Labor... Mechanical equipment. (a) General. (1) Visual inspections shall be made of the equipment to determine that it.... (3) With the exception of equipment certified for work on the proper voltage, mechanical...

  15. 29 CFR 1926.952 - Mechanical equipment.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 8 2014-07-01 2014-07-01 false Mechanical equipment. 1926.952 Section 1926.952 Labor... Mechanical equipment. (a) General. (1) Visual inspections shall be made of the equipment to determine that it... certified for work on the proper voltage, mechanical equipment shall not be operated closer to any...

  16. 10 CFR 431.405 - Exported equipment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Exported equipment. 431.405 Section 431.405 Energy... EQUIPMENT General Provisions § 431.405 Exported equipment. Under Sections 330 and 345 of the Act, this Part... for export from the United States (or such equipment was imported for export), unless such...

  17. 40 CFR 160.61 - Equipment design.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Equipment design. 160.61 Section 160... LABORATORY PRACTICE STANDARDS Equipment § 160.61 Equipment design. Equipment used in the generation... appropriate design and adequate capacity to function according to the protocol and shall be suitably...

  18. 40 CFR 160.61 - Equipment design.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 24 2011-07-01 2011-07-01 false Equipment design. 160.61 Section 160... LABORATORY PRACTICE STANDARDS Equipment § 160.61 Equipment design. Equipment used in the generation... appropriate design and adequate capacity to function according to the protocol and shall be suitably...

  19. 40 CFR 792.61 - Equipment design.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 31 2010-07-01 2010-07-01 true Equipment design. 792.61 Section 792.61...) GOOD LABORATORY PRACTICE STANDARDS Equipment § 792.61 Equipment design. Equipment used in the... of appropriate design and adequate capacity to function according to the protocol and shall...

  20. 40 CFR 792.61 - Equipment design.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 32 2011-07-01 2011-07-01 false Equipment design. 792.61 Section 792... (CONTINUED) GOOD LABORATORY PRACTICE STANDARDS Equipment § 792.61 Equipment design. Equipment used in the... of appropriate design and adequate capacity to function according to the protocol and shall...

  1. 40 CFR 160.61 - Equipment design.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 25 2013-07-01 2013-07-01 false Equipment design. 160.61 Section 160... LABORATORY PRACTICE STANDARDS Equipment § 160.61 Equipment design. Equipment used in the generation... appropriate design and adequate capacity to function according to the protocol and shall be suitably...

  2. 40 CFR 160.61 - Equipment design.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 25 2012-07-01 2012-07-01 false Equipment design. 160.61 Section 160... LABORATORY PRACTICE STANDARDS Equipment § 160.61 Equipment design. Equipment used in the generation... appropriate design and adequate capacity to function according to the protocol and shall be suitably...

  3. 40 CFR 792.61 - Equipment design.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 33 2013-07-01 2013-07-01 false Equipment design. 792.61 Section 792... (CONTINUED) GOOD LABORATORY PRACTICE STANDARDS Equipment § 792.61 Equipment design. Equipment used in the... of appropriate design and adequate capacity to function according to the protocol and shall...

  4. 40 CFR 160.61 - Equipment design.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 24 2014-07-01 2014-07-01 false Equipment design. 160.61 Section 160... LABORATORY PRACTICE STANDARDS Equipment § 160.61 Equipment design. Equipment used in the generation... appropriate design and adequate capacity to function according to the protocol and shall be suitably...

  5. 40 CFR 792.61 - Equipment design.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 33 2012-07-01 2012-07-01 false Equipment design. 792.61 Section 792... (CONTINUED) GOOD LABORATORY PRACTICE STANDARDS Equipment § 792.61 Equipment design. Equipment used in the... of appropriate design and adequate capacity to function according to the protocol and shall...

  6. 40 CFR 792.61 - Equipment design.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 32 2014-07-01 2014-07-01 false Equipment design. 792.61 Section 792... (CONTINUED) GOOD LABORATORY PRACTICE STANDARDS Equipment § 792.61 Equipment design. Equipment used in the... of appropriate design and adequate capacity to function according to the protocol and shall...

  7. 46 CFR 108.701 - Sounding equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Sounding equipment. 108.701 Section 108.701 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS DESIGN AND EQUIPMENT Miscellaneous Equipment § 108.701 Sounding equipment. Each self-propelled unit must have...

  8. 46 CFR 108.701 - Sounding equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Sounding equipment. 108.701 Section 108.701 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS DESIGN AND EQUIPMENT Miscellaneous Equipment § 108.701 Sounding equipment. Each self-propelled unit must have...

  9. Final Report

    SciTech Connect

    Webb, Robert C.; Kamon, Teruki; Toback, David; Safonov, Alexei; Dutta, Bhaskar; Dimitri, Nanopoulos; Pope, Christopher; White, James

    2013-11-18

    Overview The High Energy Physics Group at Texas A&M University is submitting this final report for our grant number DE-FG02-95ER40917. This grant has supported our wide range of research activities for over a decade. The reports contained here summarize the latest work done by our research team. Task A (Collider Physics Program): CMS & CDF Profs. T. Kamon, A. Safonov, and D. Toback co-lead the Texas A&M (TAMU) collider program focusing on CDF and CMS experiments. Task D: Particle Physics Theory Our particle physics theory task is the combined effort of Profs. B. Dutta, D. Nanopoulos, and C. Pope. Task E (Underground Physics): LUX & NEXT Profs. R. Webb and J. White(deceased) lead the Xenon-based underground research program consisting of two main thrusts: the first, participation in the LUX two-phase xenon dark matter search experiment and the second, detector R&D primarily aimed at developing future detectors for underground physics (e.g. NEXT and LZ).

  10. An Analysis of Price Determination and Markups in the Air-Conditioning and Heating Equipment Industry

    SciTech Connect

    Dale, Larry; Millstein, Dev; Coughlin, Katie; Van Buskirk, Robert; Rosenquist, Gregory; Lekov, Alex; Bhuyan, Sanjib

    2004-01-30

    In this report we calculate the change in final consumer prices due to minimum efficiency standards, focusing on a standard economic model of the air-conditioning and heating equipment (ACHE) wholesale industry. The model examines the relationship between the marginal cost to distribute and sell equipment and the final consumer price in this industry. The model predicts that the impact of a standard on the final consumer price is conditioned by its impact on marginal distribution costs. For example, if a standard raises the marginal cost to distribute and sell equipment a small amount, the model predicts that the standard will raise the final consumer price a small amount as well. Statistical analysis suggest that standards do not increase the amount of labor needed to distribute equipment the same employees needed to sell lower efficiency equipment can sell high efficiency equipment. Labor is a large component of the total marginal cost to distribute and sell air-conditioning and heating equipment. We infer from this that standards have a relatively small impact on ACHE marginal distribution and sale costs. Thus, our model predicts that a standard will have a relatively small impact on final ACHE consumer prices. Our statistical analysis of U.S. Census Bureau wholesale revenue tends to confirm this model prediction. Generalizing, we find that the ratio of manufacturer price to final consumer price prior to a standard tends to exceed the ratio of the change in manufacturer price to the change in final consumer price resulting from a standard. The appendix expands our analysis through a typical distribution chain for commercial and residential air-conditioning and heating equipment.

  11. Used energy-related laboratory equipment grant program for institutions of higher learning. Eligible equipment catalog

    SciTech Connect

    Not Available

    1994-07-01

    This is a listing of energy related equipment available through the Energy-Related Laboratory Equipment Grant Program which grants used equipment to institutions of higher education for energy-related research. Information included is an overview of the program, how to apply for a grant of equipment, eligibility requirements, types of equipment available, and the costs for the institution.

  12. 47 CFR 15.607 - Equipment authorization of Access BPL equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Equipment authorization of Access BPL equipment... DEVICES Access Broadband Over Power Line (Access BPL) § 15.607 Equipment authorization of Access BPL equipment. Access BPL equipment shall be subject to Certification as specified in § 15.101....

  13. Power Product Equipment Technician: Lawn and Garden Equipment. Teacher Edition. Student Version.

    ERIC Educational Resources Information Center

    Hilley, Robert

    This packet contains teacher and student editions for lawn and garden equipment repair and maintenance, intended for the preparation of power product equipment technicians. This publication contains four units: (1) introduction to lawn and garden equipment; (2) light-duty lawn and garden equipment; (3) heavy-duty lawn and garden equipment; and (4)…

  14. Interventional Radiology: Equipment and Techniques.

    PubMed

    Scansen, Brian A

    2016-05-01

    The breadth of small animal diseases that can now be treated by a minimally invasive, transcatheter approach continues to expand. Interventional radiology is the field of medicine that affects a therapeutic outcome via minimally invasive catheterization of peripheral blood vessels or body orifices guided by imaging. The intent of this article is to provide an overview of the equipment required for interventional radiology in veterinary medicine with a discussion of technical uses in diseases of dogs and cats.

  15. Primer for selecting lab equipment.

    PubMed

    Myers, Joe

    2007-01-01

    The preceding review provides a simplified presentation of many of the processes involved in selecting laboratory equipment--from a discussion of the most common phases of the selection process to a more comprehensive listing of the most common primary considerations and other, less-tangible issues. It was designed to provide laboratorians seeking to acquire new instruments with a framework for the collection of objective information and the evaluation of technical capabilities and acquisition options.

  16. Waterway Equipment - Boat, Barge, Motor

    DTIC Science & Technology

    2012-09-25

    missions. Gantry -type crane of suitable load capacity Means to lift the system for drop and lift and tie-down provision testing. Electromagnetic...carrying specialized equipment such as for dredging or pile drivers, floating repair shops, or elevating piers; and floating cranes for heavy...ton cranes or a 2200-ton capacity marine railway. There is a barge slip for delivery of test items directly from the Chesapeake Bay. The facility

  17. Equipment life cycle costs minimised.

    PubMed

    Kuligowski, Sharon

    2004-11-01

    With the cost of energy now a major component of building operating costs, NHS Trust managers increasingly focus on estimating total life cycle costs of equipment such as boiler room and heat, steam and incineration plant. "Life cycle costing" is a broad term and encompasses a wide range of techniques that take into account both initial and future costs as well as the savings of an investment over a period of time.

  18. [Equipment and technology in robotics].

    PubMed

    Murphy, Declan; Challacombe, Ben; Nedas, Tim; Elhage, Oussama; Althoefer, Kaspar; Seneviratne, Lakmal; Dasgupta, Prokar

    2007-05-01

    We review the evolution and current status of robotic equipment and technology in urology. We also describe future developments in the key areas of virtual reality simulation, mechatronics and nanorobotics. The history of robotic technology is reviewed and put into the context of current systems. Experts in the associated fields of nanorobotics, mechatronics and virtual reality simulation simulation review the important future developments in these areas.

  19. Medicare and durable medical equipment.

    PubMed

    Coviello, Amy

    2002-01-01

    Medicare coverage of wheelchairs, hospital beds and other durable medical equipment (DME) is a major source of confusion for people with Medicare, their families and the professionals who work with them. Yet, consumer publications rarely touch on it. In this brief we offer an overview of DME coverage issues and payment policies, including potential costs for consumers and their rights to appeal denials of payment.

  20. Strategy Guideline: HVAC Equipment Sizing

    SciTech Connect

    Burdick, A.

    2012-02-01

    The heating, ventilation, and air conditioning (HVAC) system is arguably the most complex system installed in a house and is a substantial component of the total house energy use. A right-sized HVAC system will provide the desired occupant comfort and will run efficiently. This Strategy Guideline discusses the information needed to initially select the equipment for a properly designed HVAC system. Right-sizing of an HVAC system involves the selection of equipment and the design of the air distribution system to meet the accurate predicted heating and cooling loads of the house. Right-sizing the HVAC system begins with an accurate understanding of the heating and cooling loads on a space; however, a full HVAC design involves more than just the load estimate calculation - the load calculation is the first step of the iterative HVAC design procedure. This guide describes the equipment selection of a split system air conditioner and furnace for an example house in Chicago, IL as well as a heat pump system for an example house in Orlando, Florida. The required heating and cooling load information for the two example houses was developed in the Department of Energy Building America Strategy Guideline: Accurate Heating and Cooling Load Calculations.

  1. Equipment looks like that used for burning other fuels

    SciTech Connect

    Schwieger, B.

    1980-02-01

    This article reviews the equipment used for wood-fired boilers and comments on the similarities and subtle differences among boilers and dust collectors designed for wood, coal and refuse. It is stated that in wood-fired powerplants, the air pollutant of primary concern is particulate matter and three types of dust collectors, mechanical, wet scrubbers and electrostatic precipitators are described. Finally, hydraulic, pneumatic and mechanical ash-handling systems are described.

  2. Aging Aircraft Subsystems. Equipment Life Extension within the Tornado Program

    DTIC Science & Technology

    2000-10-01

    Electronic Sampling, definition of inspection and requirements or under which conditions is the equipment overhaul procedure extended use acceptable? Pipework ...effective because the box for safe pipework operation beyond 4000 FH up to shelf represents only marginal value of the total box 8000 FH. This will be...the life extension replacement of items before reaching its final life could work will be presented. 6-14 Fuel system Pipework - 40% of all pipework

  3. Final Technical Progress Report NANOSTRUCTURED MAGNETIC MATERIALS

    SciTech Connect

    Charles M. Falco

    2012-09-13

    This report describes progress made during the final phase of our DOE-funded program on Nanostructured Magnetic Materials. This period was quite productive, resulting in the submission of three papers and presentation of three talks at international conferences and three seminars at research institutions. Our DOE-funded research efforts were directed toward studies of magnetism at surfaces and interfaces in high-quality, well-characterized materials prepared by Molecular Beam Epitaxy (MBE) and sputtering. We have an exceptionally well-equipped laboratory for these studies, with: Thin film preparation equipment; Characterization equipment; Equipment to study magnetic properties of surfaces and ultra-thin magnetic films and interfaces in multi-layers and superlattices.

  4. Critical Technology List update. Final technical report

    SciTech Connect

    Not Available

    1983-03-01

    ICRC has reviewed and updated its List of critical technology. The List comprises all proposed SRC-I Demonstration Plant equipment whose use has been determined to involve some degree of potential safety, performance, or environmental risk. ICRC has subjected equipment on the Critical Technology c to special technical review to ensure the highest possible level of quality and lowest cost commensurate with acceptable overall risks. Equipment or equipment systems still considered to be high risk are the following: Coal Slurry/Hot Oil Heat Exchangers, Coal Slurry Heaters, Second-Stage Feed Heaters, Vacuum Tower Heater, Vacuum Column, SRC/Light SRC Stripper - CSD, Severe Service Valves, Wastewater Reuse System, and the Solid Waste Disposal System. Equipment systems or pieces of equipment that have been downgraded to a lower risk category are the following: Coal Weigh-Feed System, Coal Slurry Dissolvers, Coal Dissolver Effluent Separator, and LC-Fining Reactors. Finally, ICRC has determined that many types of equipment are no longer Critical Technology, and has therefore removed them from the List.

  5. Final Technical Report

    SciTech Connect

    Richard Petriello; Frederick Bonato

    2009-04-21

    The purpose of this grant was to purchase equipment for biotechnology studies and courses at Saint Peter’s College (SPC). Equipment was used for courses such as Genetics and Biochemistry. The equipment helped SPC update its labs so as to create a better learning environment for our students.

  6. Final report

    SciTech Connect

    Dobbs, Fred C.

    2003-01-15

    species of flagellates, Spumella sp. and Bodo sp. (identifications are tentative) were isolated from South Oyster sediments by repetitive serial dilution/extinction method. Protistan cells were cultured with Cereal leaf Prescott medium and pelleted by centrifugation. Protistan DNAs were extracted with a DNA extraction kit (Sigma Co.) and the sequencing of their SSrDNA is underway. Finally, to follow up on our collaboration of Dr. Bill Johnson (Univ. of Utah), one of the co-PIs under the same NABIR umbrella, we are pleased to report we have successfully tested antibody-ferrographic capture of protists (See previous year's report for more background). Polyclonal FITC-conjugated antibody specific for a flagellate, Spumella sp., was produced by Rockland Inc., and we now are able to enumerate that species using ferrographic capture. There are, however, some issues of non-specific staining that remain to be resolved.

  7. 40 CFR 265.32 - Required equipment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... equipment, or automatic sprinklers, or water spray systems. ... of equipment specified below: (a) An internal communications or alarm system capable of providing... assistance from local police departments, fire departments, or State or local emergency response teams;...

  8. Pesticide Registration: Clarification for Ion Generating Equipment

    EPA Pesticide Factsheets

    EPA issued a Federal Register Notice that clarifies the Agency's position on the distinction between devices and pesticides with regard to ion-generating equipment and explains why such equipment will now be regulated as a pesticide.

  9. Electrical Ground Support Equipment Fabrication, Specification for

    NASA Technical Reports Server (NTRS)

    Denson, Erik C.

    2014-01-01

    This document specifies parts, materials, and processes used in the fabrication, maintenance, repair, and procurement of electrical and electronic control and monitoring equipment associated with ground support equipment (GSE) at the Kennedy Space Center (KSC).

  10. 29 CFR 1926.952 - Mechanical equipment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... of each shift during which the equipment is to be used to determine that the brakes and operating... line or equipment than the clearances set forth in § 1926.950(c) unless: (i) An insulated barrier...

  11. 46 CFR 153.484 - Prewash equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... BULK LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Design and..., equipment to move it during washing and when storing. (b) Piping, valving, and crossovers needed to...

  12. Proceedings of FED remote maintenance equipment workshop

    SciTech Connect

    Sager, P.; Garin, J.; Hager, E.R.; Spampinato, P.T.; Tobias, D.; Young, N.

    1981-11-01

    A workshop was convened in two sessions in January and March 1981, on the remote maintenance equipment for the Fusion Engineering Device (FED). The objectives of the first session were to familiarize the participants with the status of the design of the FED and to develop a remote maintenance equipment list for the FED. The objective of the second session was to have the participants present design concepts for the equipment which had been identified in the first session. The equipment list was developed for general purpose and special purpose equipment. The general purpose equipment was categorized as manipulators and other, while the special purpose equipment was subdivided according to the reactor subsystem it serviced: electrical, magnetic, and nuclear. Both mobile and fixed base manipulators were identified. Handling machines were identified as the major requirement for special purpose equipment.

  13. 7 CFR 51.58 - Equipment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Requirements for Plants Operating Under Continuous Inspection on A Contract Basis § 51.58 Equipment. All equipment used for receiving, washing, grading, packaging or storing shall be of such design, material...

  14. 14 CFR 121.605 - Airplane equipment.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., FLAG, AND SUPPLEMENTAL OPERATIONS Dispatching and Flight Release Rules § 121.605 Airplane equipment. No person may dispatch or release an airplane unless it is airworthy and is equipped as prescribed in §...

  15. 14 CFR 121.605 - Airplane equipment.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., FLAG, AND SUPPLEMENTAL OPERATIONS Dispatching and Flight Release Rules § 121.605 Airplane equipment. No person may dispatch or release an airplane unless it is airworthy and is equipped as prescribed in §...

  16. 14 CFR 121.605 - Airplane equipment.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., FLAG, AND SUPPLEMENTAL OPERATIONS Dispatching and Flight Release Rules § 121.605 Airplane equipment. No person may dispatch or release an airplane unless it is airworthy and is equipped as prescribed in §...

  17. Fire suppression and detection equipment

    SciTech Connect

    E.E. Bates

    2006-01-15

    Inspection and testing guidelines go beyond the 'Code of Federal Regulation'. Title 30 of the US Code of Federal Regulations (30 CFR) contains requirements and references to national standards for inspection, testing and maintenance of fire suppression and detection equipment for mine operators. However, federal requirements have not kept pace with national standards and best practices. The article lists National Fire Protection (NFPA) standards that are referenced by the US Mine Safety and Health Administration (MSHA) in 30 CFR. It then discusses other NFPA Standards excluded from 30 CFR and explains the NFPA standard development process. 2 refs., 3 tabs., 5 photos.

  18. Photographic Equipment Test System (PETS)

    NASA Technical Reports Server (NTRS)

    1975-01-01

    The Photographic Equipment Test System is presented. The device is a mobile optical system designed for evaluating performance of various sensors in a laboratory, in a vacuum chamber or on a flight line. The carriage is designed to allow elevation as well as azimuth control of the direction of the light from the collimator. The pneumatic tires provide an effective vibration isolation system. A target/illumination system is mounted on a motor driven linear slide, and focusing and exposure control can be operated remotely from the small electronics control console.

  19. First MAGDAS Equipment in Ecuador

    NASA Astrophysics Data System (ADS)

    Lopez, E.; Maeda, G.; Vicente, K.; Yumoto, K.; Vasquez, N.; Matsushita, H.; Shishime, A.; Vasconez, C.

    2014-01-01

    The Magnetic Data Acquisition System (MAGDAS) was installed in the protected Jerusalem Park in Malchingui- Ecuador in October of 2012, under the joint collabo ration between Kyushu University of Japan and the Quito Astronomical Observatory of the National Polytechnic School of Ecuador. In this paper, we describe the installation process and present the preliminary data obtained with the MAGDAS equip ment. The behavior of the four components, D, H, Z and F allow us to see the importance of having the Ecuador station where the magnetic field has not been systematically measured before, in valuable contribution to study the equatorial electrodynamics.

  20. General aviation avionics equipment maintenance

    NASA Technical Reports Server (NTRS)

    Parker, C. D.; Tommerdahl, J. B.

    1978-01-01

    Maintenance of general aviation avionics equipment was investigated with emphasis on single engine and light twin engine general aviation aircraft. Factors considered include the regulatory agencies, avionics manufacturers, avionics repair stations, the statistical character of the general aviation community, and owners and operators. The maintenance, environment, and performance, repair costs, and reliability of avionics were defined. It is concluded that a significant economic stratification is reflected in the maintenance problems encountered, that careful attention to installations and use practices can have a very positive impact on maintenance problems, and that new technologies and a general growth in general aviation will impact maintenance.

  1. Fuel Conservation and Construction Equipment,

    DTIC Science & Technology

    1984-02-01

    4 A-R14i 363 FUEL CONSERVATION AND CONSTRUCTION EQUIPMENT(U) ARMY ii IBELVOIR RESEARCH AND DEVELOPMENT CENTER FORT BELVOIR VA V T FALCNETTA FEB 84...141A 11111~~ 11111 __ MICROCOPY RESOLUTION TEST CHART NATIONAL BUREAU OF STANDARDS-I963-A .: .. ’V - ’ .o- .- "" AD IReport 2400 FUEL CONSERVATION AND...Subtitle) 5. TYPE OF REPORT & PERIOD COVERED FUEL CONSERVATION AND CONSTRUCTION- iEQUIPME.NT EQUI, 1T6. P1 HFORMING ORG. REPORT NUMBER 7. AUTHOR(a

  2. HAND TRUCK FOR HANDLING EQUIPMENT

    DOEpatents

    King, D.W.

    1959-02-24

    A truck is described for the handling of large and relatively heavy pieces of equipment and particularly for the handling of ion source units for use in calutrons. The truck includes a chassis and a frame pivoted to the chassis so as to be operable to swing in the manner of a boom. The frame has spaced members so arranged that the device to be handled can be suspended between or passed between these spaced members and also rotated with respect to the frame when the device is secured to the spaced members.

  3. Interface standards for computer equipment

    NASA Technical Reports Server (NTRS)

    1976-01-01

    The ability to configure data systems using modules provided by independent manufacturers is complicated by the wide range of electrical, mechanical, and functional characteristics exhibited within the equipment provided by different manufacturers of computers, peripherals, and terminal devices. A number of international organizations were and still are involved in the creation of standards that enable devices to be interconnected with minimal difficulty, usually involving only a cable or data bus connection that is defined by the standard. The elements covered by an interface standard are covered and the most prominent interface standards presently in use are identified and described.

  4. 46 CFR 154.1430 - Equipment locker.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Equipment locker. 154.1430 Section 154.1430 Shipping... Equipment § 154.1430 Equipment locker. One of each item of equipment under §§ 154.1400 and 154.1420 must be stowed in a marked locker: (a) On the open deck in or adjacent to the cargo area; or (b) In...

  5. 14 CFR 29.1561 - Safety equipment.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Safety equipment. 29.1561 Section 29.1561 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS....1561 Safety equipment. (a) Each safety equipment control to be operated by the crew in emergency,...

  6. 14 CFR 27.1561 - Safety equipment.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Safety equipment. 27.1561 Section 27.1561 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... Safety equipment. (a) Each safety equipment control to be operated by the crew in emergency, such...

  7. 14 CFR 27.1561 - Safety equipment.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Safety equipment. 27.1561 Section 27.1561 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... Safety equipment. (a) Each safety equipment control to be operated by the crew in emergency, such...

  8. 14 CFR 27.1561 - Safety equipment.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Safety equipment. 27.1561 Section 27.1561 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... Safety equipment. (a) Each safety equipment control to be operated by the crew in emergency, such...

  9. 14 CFR 29.1561 - Safety equipment.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Safety equipment. 29.1561 Section 29.1561 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS....1561 Safety equipment. (a) Each safety equipment control to be operated by the crew in emergency,...

  10. 14 CFR 27.1561 - Safety equipment.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Safety equipment. 27.1561 Section 27.1561 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... Safety equipment. (a) Each safety equipment control to be operated by the crew in emergency, such...

  11. 14 CFR 25.1561 - Safety equipment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Safety equipment. 25.1561 Section 25.1561 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS....1561 Safety equipment. (a) Each safety equipment control to be operated by the crew in emergency,...

  12. 14 CFR 29.1561 - Safety equipment.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Safety equipment. 29.1561 Section 29.1561 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS....1561 Safety equipment. (a) Each safety equipment control to be operated by the crew in emergency,...

  13. 14 CFR 29.1561 - Safety equipment.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Safety equipment. 29.1561 Section 29.1561 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS....1561 Safety equipment. (a) Each safety equipment control to be operated by the crew in emergency,...

  14. 14 CFR 25.1561 - Safety equipment.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Safety equipment. 25.1561 Section 25.1561 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS....1561 Safety equipment. (a) Each safety equipment control to be operated by the crew in emergency,...

  15. 14 CFR 25.1561 - Safety equipment.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Safety equipment. 25.1561 Section 25.1561 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS....1561 Safety equipment. (a) Each safety equipment control to be operated by the crew in emergency,...

  16. 14 CFR 25.1561 - Safety equipment.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Safety equipment. 25.1561 Section 25.1561 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS....1561 Safety equipment. (a) Each safety equipment control to be operated by the crew in emergency,...

  17. 14 CFR 25.1561 - Safety equipment.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Safety equipment. 25.1561 Section 25.1561 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS....1561 Safety equipment. (a) Each safety equipment control to be operated by the crew in emergency,...

  18. 14 CFR 27.1561 - Safety equipment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Safety equipment. 27.1561 Section 27.1561 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... Safety equipment. (a) Each safety equipment control to be operated by the crew in emergency, such...

  19. 14 CFR 29.1561 - Safety equipment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Safety equipment. 29.1561 Section 29.1561 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS....1561 Safety equipment. (a) Each safety equipment control to be operated by the crew in emergency,...

  20. 78 FR 25916 - Authorization of Radiofrequency Equipment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ...This document proposes certain changes to the Commission's equipment authorization processes to ensure that they continue to operate efficiently and effectively. In particular, it addresses the role of TCBs in certifying RF equipment and post-market surveillance, as well as the Commission's role in assessing TCB performance. It also addresses the role of test laboratories in the RF equipment......

  1. 46 CFR 28.880 - Hydraulic equipment.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 1 2013-10-01 2013-10-01 false Hydraulic equipment. 28.880 Section 28.880 Shipping... INDUSTRY VESSELS Aleutian Trade Act Vessels § 28.880 Hydraulic equipment. (a) Each hydraulic system must be... times the system's maximum operating pressure. (c) Each hydraulic system must be equipped with at...

  2. 46 CFR 28.405 - Hydraulic equipment.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 1 2014-10-01 2014-10-01 false Hydraulic equipment. 28.405 Section 28.405 Shipping... Operate With More Than 16 Individuals on Board § 28.405 Hydraulic equipment. (a) Each hydraulic system... than four times the system maximum operating pressure. (c) Each hydraulic system must be equipped...

  3. 46 CFR 28.405 - Hydraulic equipment.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 1 2013-10-01 2013-10-01 false Hydraulic equipment. 28.405 Section 28.405 Shipping... Operate With More Than 16 Individuals on Board § 28.405 Hydraulic equipment. (a) Each hydraulic system... than four times the system maximum operating pressure. (c) Each hydraulic system must be equipped...

  4. 46 CFR 28.880 - Hydraulic equipment.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 1 2012-10-01 2012-10-01 false Hydraulic equipment. 28.880 Section 28.880 Shipping... INDUSTRY VESSELS Aleutian Trade Act Vessels § 28.880 Hydraulic equipment. (a) Each hydraulic system must be... times the system's maximum operating pressure. (c) Each hydraulic system must be equipped with at...

  5. 46 CFR 28.880 - Hydraulic equipment.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 1 2014-10-01 2014-10-01 false Hydraulic equipment. 28.880 Section 28.880 Shipping... INDUSTRY VESSELS Aleutian Trade Act Vessels § 28.880 Hydraulic equipment. (a) Each hydraulic system must be... times the system's maximum operating pressure. (c) Each hydraulic system must be equipped with at...

  6. 46 CFR 28.405 - Hydraulic equipment.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 1 2012-10-01 2012-10-01 false Hydraulic equipment. 28.405 Section 28.405 Shipping... Operate With More Than 16 Individuals on Board § 28.405 Hydraulic equipment. (a) Each hydraulic system... than four times the system maximum operating pressure. (c) Each hydraulic system must be equipped...

  7. Load Bearing Equipment for Bone and Muscle

    NASA Technical Reports Server (NTRS)

    Shackelford, Linda; Griffith, Bryan

    2015-01-01

    Resistance exercise on ISS has proven effective in maintaining bone mineral density and muscle mass. Exploration missions require exercise with similar high loads using equipment with less mass and volume and greater safety and reliability than resistance exercise equipment used on ISS (iRED, ARED, FWED). Load Bearing Equipment (LBE) uses each exercising person to create and control the load to the partner.

  8. 14 CFR 121.605 - Airplane equipment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Airplane equipment. 121.605 Section 121.605..., FLAG, AND SUPPLEMENTAL OPERATIONS Dispatching and Flight Release Rules § 121.605 Airplane equipment. No person may dispatch or release an airplane unless it is airworthy and is equipped as prescribed in §...

  9. 14 CFR 121.605 - Airplane equipment.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Airplane equipment. 121.605 Section 121.605..., FLAG, AND SUPPLEMENTAL OPERATIONS Dispatching and Flight Release Rules § 121.605 Airplane equipment. No person may dispatch or release an airplane unless it is airworthy and is equipped as prescribed in §...

  10. 33 CFR 175.135 - Existing equipment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Existing equipment. 175.135 Section 175.135 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) BOATING SAFETY EQUIPMENT REQUIREMENTS Visual Distress Signals § 175.135 Existing equipment....

  11. Audiovisual Equipment Self Instruction Manual. Third Edition.

    ERIC Educational Resources Information Center

    Oates, Stanton C.

    An audiovisual equipment manual provides both the means of learning how to operate equipment and information needed to adjust equipment that is not performing properly. The manual covers the basic principles of operation for filmstrip-slide projectors, motion picture projectors, opaque projectors, overhead projectors, portable screens, record…

  12. 30 CFR 77.1914 - Electrical equipment.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Electrical equipment. 77.1914 Section 77.1914... Shaft Sinking § 77.1914 Electrical equipment. (a) Electric equipment employed below the collar of a.... (b) The insulation of all electric conductors employed below the collar of any slope or shaft...

  13. 30 CFR 77.1914 - Electrical equipment.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Electrical equipment. 77.1914 Section 77.1914... Shaft Sinking § 77.1914 Electrical equipment. (a) Electric equipment employed below the collar of a.... (b) The insulation of all electric conductors employed below the collar of any slope or shaft...

  14. 30 CFR 77.1914 - Electrical equipment.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Electrical equipment. 77.1914 Section 77.1914... Shaft Sinking § 77.1914 Electrical equipment. (a) Electric equipment employed below the collar of a.... (b) The insulation of all electric conductors employed below the collar of any slope or shaft...

  15. Inexpensive Physical Education Equipment for Children.

    ERIC Educational Resources Information Center

    Werner, Peter H.; Simmons, Richard A.

    This book presents ideas for constructing and utilizing homemade recreational equipment for elementary school children. Each chapter deals with acquisition of materials, construction of equipment, and developmental objectives and activities for using the equipment with children. A chapter called "Save Your Junk" gives instructions on how to make…

  16. 46 CFR 121.210 - Heating equipment.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Heating equipment. 121.210 Section 121.210 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS CARRYING MORE THAN 150... SYSTEMS AND EQUIPMENT Cooking and Heating § 121.210 Heating equipment. (a) Each heater must be...

  17. 46 CFR 121.210 - Heating equipment.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Heating equipment. 121.210 Section 121.210 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS CARRYING MORE THAN 150... SYSTEMS AND EQUIPMENT Cooking and Heating § 121.210 Heating equipment. (a) Each heater must be...

  18. 46 CFR 121.210 - Heating equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Heating equipment. 121.210 Section 121.210 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS CARRYING MORE THAN 150... SYSTEMS AND EQUIPMENT Cooking and Heating § 121.210 Heating equipment. (a) Each heater must be...

  19. 46 CFR 121.210 - Heating equipment.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Heating equipment. 121.210 Section 121.210 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS CARRYING MORE THAN 150... SYSTEMS AND EQUIPMENT Cooking and Heating § 121.210 Heating equipment. (a) Each heater must be...

  20. 47 CFR 78.23 - Equipment tests.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 4 2012-10-01 2012-10-01 false Equipment tests. 78.23 Section 78.23... SERVICE Applications and Licenses § 78.23 Equipment tests. (a) Following the grant of a CARS license, the... Commission, conduct equipment tests for the purpose of such adjustments and measurements as may be...

  1. 47 CFR 73.1610 - Equipment tests.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 4 2012-10-01 2012-10-01 false Equipment tests. 73.1610 Section 73.1610... Rules Applicable to All Broadcast Stations § 73.1610 Equipment tests. (a) During the process of..., without further authority from the FCC, conduct equipment tests for the purpose of making such...

  2. 47 CFR 74.13 - Equipment tests.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 4 2012-10-01 2012-10-01 false Equipment tests. 74.13 Section 74.13... Services in Part 74 § 74.13 Equipment tests. (a) During the process of construction of any class of radio... equipment tests for the purpose of such adjustments and measurements as may be necessary to...

  3. 47 CFR 32.2232 - Circuit equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... used in the construction of such plant. Circuit equipment may be located in central offices, in... includable in Account 2231.2, Other Radio Facilities. This account also excludes such equipment which is an... 47 Telecommunication 2 2011-10-01 2011-10-01 false Circuit equipment. 32.2232 Section...

  4. 45 CFR 92.32 - Equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Equipment. 92.32 Section 92.32 Public Welfare..., Property, and Subawards § 92.32 Equipment. (a) Title. Subject to the obligations and conditions set forth in this section, title to equipment acquired under a grant or subgrant will vest upon acquisition...

  5. 47 CFR 32.2123 - Office equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 2 2011-10-01 2011-10-01 false Office equipment. 32.2123 Section 32.2123... FOR TELECOMMUNICATIONS COMPANIES Instructions for Balance Sheet Accounts § 32.2123 Office equipment. This account shall include the original cost of office equipment in offices, shops and all...

  6. 47 CFR 74.13 - Equipment tests.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 4 2011-10-01 2011-10-01 false Equipment tests. 74.13 Section 74.13... Services in Part 74 § 74.13 Equipment tests. (a) During the process of construction of any class of radio... equipment tests for the purpose of such adjustments and measurements as may be necessary to...

  7. 47 CFR 78.23 - Equipment tests.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 4 2011-10-01 2011-10-01 false Equipment tests. 78.23 Section 78.23... SERVICE Applications and Licenses § 78.23 Equipment tests. (a) Following the grant of a CARS license, the... Commission, conduct equipment tests for the purpose of such adjustments and measurements as may be...

  8. 47 CFR 74.551 - Equipment changes.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 4 2011-10-01 2011-10-01 false Equipment changes. 74.551 Section 74.551... § 74.551 Equipment changes. (a) Modifications may be made to an existing authorization in accordance with §§ 1.929 and 1.947 of this chapter. (b) Permissible changes in equipment operating in the bands...

  9. 47 CFR 74.151 - Equipment changes.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 4 2011-10-01 2011-10-01 false Equipment changes. 74.151 Section 74.151....151 Equipment changes. The licensee of an experimental broadcast station may make any changes in the equipment that are deemed desirable or necessary provided: (a) That the operating frequency is not...

  10. 47 CFR 27.51 - Equipment authorization.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 2 2011-10-01 2011-10-01 false Equipment authorization. 27.51 Section 27.51... COMMUNICATIONS SERVICES Technical Standards § 27.51 Equipment authorization. (a) Each transmitter utilized for... certification procedure. (b) Any manufacturer of radio transmitting equipment to be used in these services...

  11. 47 CFR 74.651 - Equipment changes.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 4 2011-10-01 2011-10-01 false Equipment changes. 74.651 Section 74.651... Stations § 74.651 Equipment changes. (a) Modifications may be made to an existing authorization in accordance with §§ 1.929 and 1.947 of this chapter. (b) Multiplexing equipment may be installed on...

  12. 45 CFR 2541.320 - Equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 4 2011-10-01 2011-10-01 false Equipment. 2541.320 Section 2541.320 Public... Changes, Property and Subawards § 2541.320 Equipment. (a) Title. Subject to the obligations and conditions set forth in this section, title to equipment acquired under a grant or subgrant will vest...

  13. 47 CFR 73.1610 - Equipment tests.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 4 2011-10-01 2011-10-01 false Equipment tests. 73.1610 Section 73.1610... Rules Applicable to All Broadcast Stations § 73.1610 Equipment tests. (a) During the process of..., without further authority from the FCC, conduct equipment tests for the purpose of making such...

  14. 47 CFR 24.51 - Equipment authorization.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 2 2011-10-01 2011-10-01 false Equipment authorization. 24.51 Section 24.51... SERVICES Technical Standards § 24.51 Equipment authorization. (a) Each transmitter utilized for operation... part. (b) Any manufacturer of radio transmitting equipment to be used in these services may...

  15. 14 CFR 29.1431 - Electronic equipment.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Electronic equipment. 29.1431 Section 29... AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Equipment Miscellaneous Equipment § 29.1431 Electronic... operation of any other radio or electronic unit, or system of units, required by this chapter....

  16. 14 CFR 1260.134 - Equipment.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., Hospitals, and Other Non-Profit Organizations Property Standards § 1260.134 Equipment. (a) For grants and.... (3) A physical inventory of equipment shall be taken and the results reconciled with the equipment... difference. The recipient shall, in connection with the inventory, verify the existence, current...

  17. 14 CFR 29.1431 - Electronic equipment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... equipment. (a) Radio communication and navigation equipment installations must be free from hazards in... environmental conditions. (b) Radio communication and navigation equipment, controls, and wiring must be... operation of any other radio or electronic unit, or system of units, required by this chapter....

  18. 47 CFR 32.2123 - Office equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Office equipment. 32.2123 Section 32.2123... FOR TELECOMMUNICATIONS COMPANIES Instructions for Balance Sheet Accounts § 32.2123 Office equipment. This account shall include the original cost of office equipment in offices, shops and all...

  19. 33 CFR 143.405 - Equipment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Equipment. 143.405 Section 143.405 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OUTER CONTINENTAL SHELF ACTIVITIES DESIGN AND EQUIPMENT Standby Vessels § 143.405 Equipment. (a) Standby...

  20. 21 CFR 606.60 - Equipment.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... mo. Automated blood-typing machine Observe controls for correct results Each day of use... GOOD MANUFACTURING PRACTICE FOR BLOOD AND BLOOD COMPONENTS Equipment § 606.60 Equipment. (a) Equipment used in the collection, processing, compatibility testing, storage and distribution of blood and...

  1. 21 CFR 606.60 - Equipment.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... mo. Automated blood-typing machine Observe controls for correct results Each day of use... GOOD MANUFACTURING PRACTICE FOR BLOOD AND BLOOD COMPONENTS Equipment § 606.60 Equipment. (a) Equipment used in the collection, processing, compatibility testing, storage and distribution of blood and...

  2. 21 CFR 606.60 - Equipment.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... mo. Automated blood-typing machine Observe controls for correct results Each day of use... GOOD MANUFACTURING PRACTICE FOR BLOOD AND BLOOD COMPONENTS Equipment § 606.60 Equipment. (a) Equipment used in the collection, processing, compatibility testing, storage and distribution of blood and...

  3. 21 CFR 606.60 - Equipment.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... mo. Automated blood-typing machine Observe controls for correct results Each day of use... GOOD MANUFACTURING PRACTICE FOR BLOOD AND BLOOD COMPONENTS Equipment § 606.60 Equipment. (a) Equipment used in the collection, processing, compatibility testing, storage and distribution of blood and...

  4. 21 CFR 606.60 - Equipment.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... mo. Automated blood-typing machine Observe controls for correct results Each day of use... GOOD MANUFACTURING PRACTICE FOR BLOOD AND BLOOD COMPONENTS Equipment § 606.60 Equipment. (a) Equipment used in the collection, processing, compatibility testing, storage and distribution of blood and...

  5. 10 CFR 431.405 - Exported equipment.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 3 2011-01-01 2011-01-01 false Exported equipment. 431.405 Section 431.405 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY PROGRAM FOR CERTAIN COMMERCIAL AND INDUSTRIAL EQUIPMENT General Provisions § 431.405 Exported equipment. Under Sections 330 and 345 of the Act, this...

  6. 10 CFR 431.404 - Imported equipment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Imported equipment. 431.404 Section 431.404 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY PROGRAM FOR CERTAIN COMMERCIAL AND INDUSTRIAL EQUIPMENT General Provisions § 431.404 Imported equipment. (a) Under sections 331 and 345 of the Act,...

  7. 10 CFR 431.404 - Imported equipment.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 3 2011-01-01 2011-01-01 false Imported equipment. 431.404 Section 431.404 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY PROGRAM FOR CERTAIN COMMERCIAL AND INDUSTRIAL EQUIPMENT General Provisions § 431.404 Imported equipment. (a) Under sections 331 and 345 of the Act,...

  8. 14 CFR 25.1307 - Miscellaneous equipment.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Miscellaneous equipment. 25.1307 Section 25.1307 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Equipment General § 25.1307 Miscellaneous equipment....

  9. 14 CFR 25.1307 - Miscellaneous equipment.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Miscellaneous equipment. 25.1307 Section 25.1307 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Equipment General § 25.1307 Miscellaneous equipment....

  10. 14 CFR 25.1307 - Miscellaneous equipment.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Miscellaneous equipment. 25.1307 Section 25.1307 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Equipment General § 25.1307 Miscellaneous equipment....

  11. 14 CFR 25.1307 - Miscellaneous equipment.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Miscellaneous equipment. 25.1307 Section 25.1307 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Equipment General § 25.1307 Miscellaneous equipment....

  12. Protective equipment: continuous and contingent application in the treatment of self-injurious behavior.

    PubMed Central

    Dorsey, M F; Iwata, B A; Reid, D H; Davis, P A

    1982-01-01

    This study evaluated the use of protective equipment in treating self-injurious behavior (SIB) exhibited by three retarded persons. In Experiment 1, the equipment was first applied continuously during 20-min sessions in individual multiple baseline designs across settings. Results showed substantial reductions in head hitting, eye gouging, and hand biting. Brief periods of time-out with the protective equipment were later made contingent on SIB and combined with a differential reinforcement procedure. Reduced levels of SIB was maintained with all subjects. Additionally, the amount of time during which the equipment was applied decreased as the SIB diminished. Experiment 2 evaluated the use of contingent protective equipment (the final condition in Experiment 1) when applied directly in the subjects' living units during the day. During Experiment 2, SIB remained at or below the levels found at the termination of Experiment 1. Finally, in an effort to assess the long-term effectiveness of the procedure, responsibility for implementation was given to the staff who were typically assigned to provide therapy to the subjects. Follow-up probe observations conducted up to 104 days after termination of the final experimental condition showed continued low levels of both SIB and equipment usage. Results of these experiments suggest that contingent protective equipment and differential reinforcement may be effective in reducing chronic self-injury. PMID:7118755

  13. Liquid-Liquid Extraction Equipment

    SciTech Connect

    Jack D. Law; Terry A. Todd

    2008-12-01

    Solvent extraction processing has demonstrated the ability to achieve high decontamination factors for uranium and plutonium while operating at high throughputs. Historical application of solvent extraction contacting equipment implies that for the HA cycle (primary separation of uranium and plutonium from fission products) the equipment of choice is pulse columns. This is likely due to relatively short residence times (as compared to mixer-settlers) and the ability of the columns to tolerate solids in the feed. Savannah River successfully operated the F-Canyon with centrifugal contactors in the HA cycle (which have shorter residence times than columns). All three contactors have been successfully deployed in uranium and plutonium purification cycles. Over the past 20 years, there has been significant development of centrifugal contactor designs and they have become very common for research and development applications. New reprocessing plants are being planned in Russia and China and the United States has done preliminary design studies on future reprocessing plants. The choice of contactors for all of these facilities is yet to be determined.

  14. Carbon Absorber Retrofit Equipment (CARE)

    SciTech Connect

    Klein, Eric

    2015-12-23

    During Project DE-FE0007528, CARE (Carbon Absorber Retrofit Equipment), Neumann Systems Group (NSG) designed, installed and tested a 0.5MW NeuStream® carbon dioxide (CO2) capture system using the patented NeuStream® absorber equipment and concentrated (6 molal) piperazine (PZ) as the solvent at Colorado Springs Utilities’ (CSU’s) Martin Drake pulverized coal (PC) power plant. The 36 month project included design, build and test phases. The 0.5MW NeuStream® CO2 capture system was successfully tested on flue gas from both coal and natural gas combustion sources and was shown to meet project objectives. Ninety percent CO2 removal was achieved with greater than 95% CO2product purity. The absorbers tested support a 90% reduction in absorber volume compared to packed towers and with an absorber parasitic power of less than 1% when configured for operation with a 550MW coal plant. The preliminary techno-economic analysis (TEA) performed by the Energy and Environmental Research Center (EERC) predicted an over-the-fence cost of $25.73/tonne of CO2 captured from a sub-critical PC plant.

  15. [Future perspectives for equipment maintenance and servicing].

    PubMed

    Frankenberger, H

    1987-03-01

    Based on the Equipment Safety Law, the Medical Technical Regulations in force since 1 January 1986, and the German Standard DIN 13252: "Inhalational anesthetic Apparatus--requirements for safety and testing", a maintenance system for medical equipment is presented. The maintenance system comprises the check of the equipment by the user before clinical use, maintenance procedures when the equipment is in daily clinical use (maintenance system I), inspection of the equipment at fixed intervals (maintenance system II), and the repair of the equipment should it break down (maintenance system III). Possibilities and perspectives for rationalizing test procedures by means of test simulators are shown. The initial or repeated instruction on medical equipment with life-supporting functions can be performed more systematically when appropriately designed test simulators are used.

  16. Final Technical Report

    SciTech Connect

    Aristos Aristidou Natureworks); Robert Kean; Tom Schechinger; Stuart Birrell; Jill Euken

    2007-10-01

    The two main objectives of this project were: 1) to develop and test technologies to harvest, transport, store, and separate corn stover to supply a clean raw material to the bioproducts industry, and 2) engineer fermentation systems to meet performance targets for lactic acid and ethanol manufacturers. Significant progress was made in testing methods to harvest corn stover in a “single pass” harvest mode (collect corn grain and stover at the same time). This is technically feasible on small scale, but additional equipment refinements will be needed to facilitate cost effective harvest on a larger scale. Transportation models were developed, which indicate that at a corn stover yield of 2.8 tons/acre and purchase price of $35/ton stover, it would be unprofitable to transport stover more than about 25 miles; thus suggesting the development of many regional collection centers. Therefore, collection centers should be located within about 30 miles of the farm, to keep transportation costs to an acceptable level. These collection centers could then potentially do some preprocessing (to fractionate or increase bulk density) and/or ship the biomass by rail or barge to the final customers. Wet storage of stover via ensilage was tested, but no clear economic advantages were evident. Wet storage eliminates fire risk, but increases the complexity of component separation and may result in a small loss of carbohydrate content (fermentation potential). A study of possible supplier-producer relationships, concluded that a “quasi-vertical” integration model would be best suited for new bioproducts industries based on stover. In this model, the relationship would involve a multiyear supply contract (processor with purchase guarantees, producer group with supply guarantees). Price will likely be fixed or calculated based on some formula (possibly a cost plus). Initial quality requirements will be specified (but subject to refinement).Producers would invest in harvest

  17. Purex: process and equipment performance

    SciTech Connect

    Orth, D.A.

    1986-01-01

    The Purex process is the solvent extraction system that uses tributyl phosphate as the extractant for separating uranium and plutonium from irradiated reactor fuels. Since the first flowsheet was proposed at Oak Ridge National Laboratory in 1950, the process has endured for over 30 years with only minor modifications. The spread of the technology was rapid, and worldwide use or research on Purex-type processes was reported by the time of the 1955 Geneva Conference. The overall performance of the process has been so good that there are no serious contenders for replacing it soon. This paper presents: process description; equipment performance (mixer-settlers, pulse columns, rapid contactors); fission product decontamination; solvent effects (solvent degradation products); and partitioning of uranium and plutonium.

  18. Antenna Calibration and Measurement Equipment

    NASA Technical Reports Server (NTRS)

    Rochblatt, David J.; Cortes, Manuel Vazquez

    2012-01-01

    A document describes the Antenna Calibration & Measurement Equipment (ACME) system that will provide the Deep Space Network (DSN) with instrumentation enabling a trained RF engineer at each complex to perform antenna calibration measurements and to generate antenna calibration data. This data includes continuous-scan auto-bore-based data acquisition with all-sky data gathering in support of 4th order pointing model generation requirements. Other data includes antenna subreflector focus, system noise temperature and tipping curves, antenna efficiency, reports system linearity, and instrument calibration. The ACME system design is based on the on-the-fly (OTF) mapping technique and architecture. ACME has contributed to the improved RF performance of the DSN by approximately a factor of two. It improved the pointing performances of the DSN antennas and productivity of its personnel and calibration engineers.

  19. AST inspection methods and equipment

    SciTech Connect

    Burns, R.C.; Acosta, N.J.; Lim, R.

    1995-12-31

    Changes in the regulatory climate regarding Aboveground Storage Tanks (ASTs) and the costs of properly operating and maintaining these structures across the country are resulting in an ever-increasing need for more refined inspection techniques to detect leaks in tanks. The growing maze of new rules and regulations being imposed on tank owners and operators makes the early detection of leaks in storage tanks a desirable goal in order to minimize the results of any unwanted release of stored product to the environment. The costs of removing tanks from service and making repairs to fix problems or to avoid future problems also makes detection of possible leak paths for storage tanks a desirable goal. Much attention is currently being brought by many different parties to the issue of advancing methods of leak detection for storage tanks. A review of the current state of AST inspection methods and equipment may prove informative.

  20. The Nichols Wing Cutting Equipment

    NASA Technical Reports Server (NTRS)

    Ford, James B

    1923-01-01

    Described here is wing cutting equipment for the economical production of metal wings for wind tunnel models. The machine will make any size of constant-section wing or strut up to one-sixth inch chord by 36-inch span and up to a thickness of one and one-quarter inches. It cuts a smooth, true model that is accurate to within two-thousandths of an inch on any ordinate. The holding jaws are so designed as to leave the model free of chip marks, and the only hand finishing necessary after the cutting is a rub with amunite to remove burrs. The actual change on ordinate in this finishing rub is less than .0002 inches.

  1. 41 CFR 109-50.203 - Eligible equipment.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    .... 41Refrigeration, Air Conditioning and Air Circulating Equipment. 52Measuring Tools 60Fiber Optics Materials... Equipment (Including Firmware), Software, Supplies and Support Equipment 74Office Machines, Text...

  2. 41 CFR 109-50.203 - Eligible equipment.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    .... 41Refrigeration, Air Conditioning and Air Circulating Equipment. 52Measuring Tools 60Fiber Optics Materials... Equipment (Including Firmware), Software, Supplies and Support Equipment 74Office Machines, Text...

  3. 41 CFR 109-50.203 - Eligible equipment.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    .... 41Refrigeration, Air Conditioning and Air Circulating Equipment. 52Measuring Tools 60Fiber Optics Materials... Equipment (Including Firmware), Software, Supplies and Support Equipment 74Office Machines, Text...

  4. Equipment qualification (EQ): Risk scoping study

    SciTech Connect

    Bustard, L.D.; Clark, J.; Medford, G.T.; Kolaczkowski, A.M.

    1989-01-01

    The objective of the EQ--Risk Scoping Study was to use probabilistic risk assessment (PRA) techniques (1) to assess the impact of electrical equipment environmental qualification or lack thereof on reactor risk and its uncertainties, and (2) to identify any analyses or testing that may be necessary to reduce the risk or its uncertainties stemming from lack of qualification of equipment important to safety. To achieve these objectives, PRA techniques and insights were employed to identify equipment that must function in accident-induced harsh environments and whose failure would be risk significant. Several components from the resultant list were then selected for more detailed analyses. Accident scenarios and environments, which PRAs suggest are risk significant, were determined for each selected equipment operation. For these accident conditions, both equipment qualification research and test experiences were examined to determine whether equipment accident reliability might differ substantially from the reliability values based on normal operation conditions employed in past PRA analyses. Note, accident reliability information is generally unavailable. Where significant differences were considered probable, parametric risk achievement analyses were used to assess the potential risk impact of the equipment failures. In addition, those equipment qualification practices and outstanding research issues that potentially could impact the accident equipment reliability were noted. This information, when combined with perspectives regarding potential equipment risk impact, provided a basis for assessing the potential risk importance of various EQ practices and issues. Additional discussion regarding the study's approach, conclusions, and recommendations is provided. 54 refs., 9 figs., 33 tabs.

  5. Equipment for Nonlinear Photonics Research - Light Control and Image Transmission in Specially-Designed Photonic

    DTIC Science & Technology

    2014-03-14

    AFRL-OSR-VA-TR-2014-0068 Equipment for Nonlinear Photonics Research Zhigang Chen SAN FRANCISCO STATE UNIVERSITY Final Report 03/14/2014 DISTRIBUTION...34Equipment for Nonlinear Photonics Research - Light control and image transmission in specially-designed photonic " Contract/Grant #: FA9550...project is to develop research programs at the frontier of nonlinear optics/ photonics that could lead to fundamental understandings in scientific

  6. USSR Report Engineering and Equipment.

    DTIC Science & Technology

    2007-11-02

    MATERIALS SCIENCE (UMS) USSR: LIFE SCIENCES (ULS) USSR: CHEMISTRY (UCH) USSR: ELECTRONICS $ ELECTRICAL ENGINEERING (UEE) USSR: PHYSICS f...Enhancing Efficiency of Drying Process by Means of Cooling in Tubular Finned Air Coolers (V.A. Kanavo, A.A. Polyakov ; IZVESTIYA VYSSIIIKII UCHEBNYKH...of elements, extensive investigation of the physics of strength failures and, finally, development of integrated models of service life and

  7. Flotation and Survival Equipment Studies

    DTIC Science & Technology

    1978-01-01

    resubmerged, made a maximum exhalation, and turned the air control valve to the spirometer position. The subject made three maximum inhalations and...exhalations and then turned the air control valve from the spirometer to snorkel position. After the final weight was obtained, the subject emerged from the...recording on the spirometer drum. The residual volume (VR) and body density (DI) were calculated as follows: VITO 22 E VCO iV ANGLA =0 -o 90 VINTIC,. _ _j It

  8. Mechanical equipment of the Dnestr Multipurpose Hydropower Development

    SciTech Connect

    Beketov, M.V.; Fedorov, B.A.; Oservaser, Y.S.

    1985-05-01

    A review of the mechanical equipment of the Dnestr. Multipurpose Hydropower Development discloses that the construction of a trestle with crabs of the service gantry cranes on the gated wall of the upper pool made it possible to operate the gates under conditions of incomplete construction, which provided start-up of all units on time. Secondly, the use of service gates during construction eliminated the construction of additional temporary flashboards and the concomitant consumption of metal. Third, the use of structural elements of the concrete-buggy trestle of the Sayano-Shushenskoe hydrostation instead of the earlier specified reinforced-concrete elements of the bridge and crane beams considerably simplified fabrication and shortened assembly time. Finally, the timely design developments for the mechanical equipment in the construction period, correlated to the actual conditions at the construction site, made it possible to accomplish the assembly works in the shortest possible time.

  9. WP EMPLACEMENT CONTROL AND COMMUNICATION EQUIPMENT DESCRIPTIONS

    SciTech Connect

    N.T. Raczka

    1997-10-02

    The objective and scope of this document are to list and briefly describe the major control and communication equipment necessary for waste package emplacement at the proposed nuclear waste repository at Yucca Mountain. Primary performance characteristics and some specialized design features of the required equipment are explained and summarized in the individual subsections of this document. This task was evaluated in accordance with QAP-2-0 and found not to be quality affecting. Therefore, this document was prepared in accordance with NAP-MG-012. The following control and communication equipment are addressed in this document: (1) Programmable Logic Controllers (PLC's); (2) Leaky Feeder Radio Frequency Communication Equipment; (3) Slotted Microwave guide Communication Equipment; (4) Vision Systems; (5) Radio Control Equipment; and (6) Enclosure Cooling Systems.

  10. Equipment management user's handbook for property custodians

    NASA Technical Reports Server (NTRS)

    1993-01-01

    The NASA Equipment Management User's Handbook for Property Custodians is issued as an instructional guide for personnel designated as property custodians and technical personnel involved in the acquisition, management, and use of NASA-owned equipment. This handbook provides general information and basic operational procedures for processing equipment transactions through the agency-wide NASA Equipment Management System (NEMS). Each NASA installation must prepare supplementary instructions for local requirements beyond the scope of NASA-wide policies and procedures contained herein, or as specified for local implementation in NHB 4200.1, 'NASA Equipment Management Manual.' NHB 4200.1 sets forth policy, uniform performance standards, and procedural guidance to NASA personnel for the acquisition, management, and use of NASA-owned equipment. This handbook is a controlled document, issued in loose-leaf form and revised by page changes. Additional copies for internal use may be obtained through normal distribution.

  11. Equipment damper original design and qualification results

    NASA Astrophysics Data System (ADS)

    Demerville, T.; Guay, P.

    2003-09-01

    During the launching phase, satellites are undoubtedly faced to severe mechanical environment, which appears to be one of the most critical issues to cope with. Various solutions can be investigated to protect the onboard equipments during these critical phases. Actually, theses vibratory damages can be reduced at the same time by optimising the architecture of the satellite but also by local actions aiming more on the propagation of the vibrations and thus limiting the transmission of the vibrations through the whole equipment. The latter solution also called "passive solution" is developed by SMAC under the CNES contract to protect along all six degree of freedom the small reaction wheel, chosen for the MYRIADE microsatellite family, from random vibrations and shocks. This original solution consists in uncoupling the reaction wheel from the satellite structure by an isolator system made out of a high damping viscoelastic material: the SMACTANE®. Technical trade-off and design issue, that has led to select the final flight configuration, will be discussed in parallel with the design constraints in term of: mass and size, due to the lack of space onboard MYRIADE platform, and transfer function performances, addressing low cut-off frequency and quality-factor limitation at cut-off frequency. In particular, the solution implemented in order to minimize coupling phenomenon between axis will be particularly described. Main features of the flight models and the qualification tests results will be given. Despite many advantages, it is well known that damping viscoelastic materials have some disadvantages, like their non-linear behaviour depending on the mechanical levels applied and their poor thermal and electric conductivity. So, to conclude, we try to show how new ways seem to be promising and keep all interest in using viscoelastic materials in space applications. On the one hand, the way to specify the damping performances and to characterize them will be in

  12. Preventive maintenance prioritization index of medical equipment using quality function deployment.

    PubMed

    Saleh, Neven; Sharawi, Amr A; Elwahed, Manal Abd; Petti, Alberto; Puppato, Daniele; Balestra, Gabriella

    2015-05-01

    Preventive maintenance is a core function of clinical engineering, and it is essential to guarantee the correct functioning of the equipment. The management and control of maintenance activities are equally important to perform maintenance. As the variety of medical equipment increases, accordingly the size of maintenance activities increases, the need for better management and control become essential. This paper aims to develop a new model for preventive maintenance priority of medical equipment using quality function deployment as a new concept in maintenance of medical equipment. We developed a three-domain framework model consisting of requirement, function, and concept. The requirement domain is the house of quality matrix. The second domain is the design matrix. Finally, the concept domain generates a prioritization index for preventive maintenance considering the weights of critical criteria. According to the final scores of those criteria, the prioritization action of medical equipment is carried out. Our model proposes five levels of priority for preventive maintenance. The model was tested on 200 pieces of medical equipment belonging to 17 different departments of two hospitals in Piedmont province, Italy. The dataset includes 70 different types of equipment. The results show a high correlation between risk-based criteria and the prioritization list.

  13. 78 FR 16501 - Application for Final Commitment for a Long-Term Loan or Financial Guarantee in Excess of $100...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-15

    ... equipment, plus consulting and engineering services. Information on Decision: Information on the final... this notice does not include confidential or proprietary business information; information which,...

  14. Physician ownership of medical equipment.

    PubMed

    Reschovsky, James; Cassil, Alwyn; Pham, Hoangmai H

    2010-12-01

    This Data Bulletin presents findings from the Center for Studying Health System Change (HSC) 2008 Health Tracking Physician Survey, a nationally rep­resentative mail survey of U.S. physicians providing at least 20 hours per week of direct patient care. The sample of physicians was drawn from the American Medical Association master file and included active, nonfederal, office- and hospital-based physicians. Residents and fellows were excluded, as well as radiologists, anesthesiologists and pathologists. The survey includes responses from more than 4,700 phy­sicians, and the response rate was 62 percent. Since this Data Bulletin examines the extent of physician practice ownership or leasing of medical equipment, the sample was limited to 2,750 physicians practic­ing in community-based, physician-owned practices, who represent 58 percent of all physicians surveyed. Physicians employed by hospitals, who practiced in hospital-based settings or who worked in hospital-owned practices were excluded.

  15. ISS qualified thermal carrier equipment

    NASA Astrophysics Data System (ADS)

    Deuser, Mark S.; Vellinger, John C.; Jennings, Wm. M.

    2000-01-01

    Biotechnology is undergoing a period of rapid and sustained growth, a trend which is expected to continue as the general population ages and as new medical treatments and products are conceived. As pharmaceutical and biomedical companies continue to search for improved methods of production and, for answers to basic research questions, they will seek out new avenues of research. Space processing on the International Space Station (ISS) offers such an opportunity! Space is rapidly becoming an industrial laboratory for biotechnology research and processing. Space bioprocessing offers exciting possibilities for developing new pharmaceuticals and medical treatments, which can be used to benefit mankind on Earth. It also represents a new economic frontier for the private sector. For over eight years, the thermal carrier development team at SHOT has been working with government and commercial sector scientists who are conducting microgravity experiments that require thermal control. SHOT realized several years ago that the hardware currently being used for microgravity thermal control was becoming obsolete. It is likely that the government, academic, and industrial bioscience community members could utilize SHOT's hardware as a replacement to their current microgravity thermal carrier equipment. Moreover, SHOT is aware of several international scientists interested in utilizing our space qualified thermal carrier. SHOT's economic financing concept could be extremely beneficial to the international participant, while providing a source of geographic return for their particular region. Beginning in 2000, flight qualified thermal carriers are expected to be available to both the private and government sectors. .

  16. Construction equipment for lunar base

    NASA Technical Reports Server (NTRS)

    1987-01-01

    Georgia Tech's student design projects for the 1986-1989 academic years relate to the proximate era of lunar exploration and habitation. This era might be described as beginning with robotic prospecting for hydrogen at the lunar poles and ending when a continuously inhabited lunar base is established. The focus was on the design of equipment and systems needed to support the activities contemplated for this portion of the space program. Some specific interests which were identified are listed: Geological exploration; Soils testing; Site preparation; Landing and launch operations; Cargo handling; Base construction; Terrain reconfiguration; Mining, beneficiation and haulage; Pilot - plant manufacturing processes. These design efforts were closely coordinated with those by others as they developed habitat modules, flight vehicles, etc. An example is the development of a standardized inter modal cargo interface. Projects for fall quarter 1986 were: A three-legged walker which serves as a chassis for various interchangeable implements; A digging implement for the walker; A lifting implement for the walker; A cargo interface standard. Some projects were limited to one academic quarter, but most have been pursued for several quarters. A few are expected to evolve over the three-year period.

  17. Export of electronics equipment waste.

    PubMed

    LaDou, Joseph; Lovegrove, Sandra

    2008-01-01

    Electronics equipment waste ("e-waste") includes discarded computers, computer monitors, television sets, and cell phones. Less than 10% of e-waste is currently recycled. The United States and other developed countries export e-waste primarily to Asia, knowing it carries a real harm to the poor communities where it will be discarded. A 2006 directive bans the use of lead, mercury, cadmium, hexavalent chromium, and certain brominated flame retardants in most electronics products sold in the EU. A similar directive facilitates the development and design of clean electronics products with longer lifespans that are safe and easy to repair, upgrade, and recycle, and will not expose workers and the environment to hazardous chemicals. These useful approaches apply only regionally and cover only a fraction of the hazardous substances used in electronics manufacture, however. There is an urgent need for manufacturers of electronics products to take responsibility for their products from production to end-of-life, and for much tighter controls both on the transboundary movement of e-waste and on the manner in which it is recycled. Manufacturers must develop clean products with longer lifespans that are safe and easy to repair, upgrade, and recycle and will not expose workers and the environment to hazardous chemicals.

  18. Equipment leasing as a joint venture.

    PubMed

    Figgins, K D

    1986-01-01

    A lack of capital to expand programs, develop new facilities, and replace necessary equipment is a problem frequently confronted in today's medical group practices. Historically, many groups have offset some of the costs of growth by utilizing investment tax credits for depreciable equipment to provide tax shelters for group physicians. Due to recent tax court decisions, however, there is the possibility that many of these tax credits will be disallowed. In an effort to accomplish their original goal of purchasing equipment, passing through tax credits to individual physician partners, and obtaining financial resources at the best market rate, two California medical groups formed an equipment leasing partnership.

  19. 75 FR 35439 - Medical Diagnostic Equipment Accessibility Standards

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-22

    ... TRANSPORTATION BARRIERS COMPLIANCE BOARD Medical Diagnostic Equipment Accessibility Standards AGENCY... equipment to ensure that such equipment is accessible to, and usable by, individuals with disabilities to... accessibility needs of individuals with disabilities with respect to medical diagnostic equipment and...

  20. Satellite services system analysis study. Volume 3: Service equipment requirements

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Service equipment mission requirements are discussed. On-orbit operations, satellite classes, and reference missions are included. Service equipment usage and requirements are considered. Equipment identification methodology is discussed. Service equipment usage is analyzed, including initial launch, revisit, Earth return, and orbital storage. A summary of service requirements and equipment is presented, including service equipment status, even interaction, satellite features, and observations.

  1. Lunar construction/mining equipment

    NASA Technical Reports Server (NTRS)

    Ozdemir, Levent

    1990-01-01

    For centuries, mining has utilized drill and blast as the primary method of rock excavation. Although this technique has undergone significant improvements, it still remains a cyclic, labor intensive operation with inherent safety hazards. Other drawbacks include damage to the surrounding ground, creation of blast vibrations, rough excavation walls resulting in increased ventilation requirements, and the lack of selective mining ability. Perhaps the most important shortcoming of drill and blast is that it is not conducive to full implementation of automation or robotics technologies. Numerous attempts have been made in the past to automate drill and blast operations to remove personnel from the hazardous work environment. Although most of the concepts devised look promising on paper, none of them was found workable on a sustained production basis. In particular, the problem of serious damage to equipment during the blasting cycle could not be resolved regardless of the amount of charge used in excavation. Since drill and blast is not capable of meeting the requirements of a fully automated rock fragmentation method, its role is bound to gradually decrease. Mechanical excavation, in contrast, is highly suitable to automation because it is a continuous process and does not involve any explosives. Many of the basic principles and trends controlling the design of an earth-based mechanical excavator will hold in an extraterrestrial environment such as on the lunar surface. However, the economic and physical limitations for transporting materials to space will require major rethinking of these machines. In concept, then, a lunar mechanical excavator will look and perform significantly different from one designed for use here on earth. This viewgraph presentation gives an overview of such mechanical excavator systems.

  2. Space processing applications payload equipment study. Volume 2E: Commercial equipment utility

    NASA Technical Reports Server (NTRS)

    Smith, A. G. (Editor)

    1974-01-01

    Examination of commercial equipment technologies revealed that the functional performance requirements of space processing equipment could generally be met by state-of-the-art design practices. Thus, an apparatus could be evolved from a standard item or derived by custom design using present technologies. About 15 percent of the equipment needed has no analogous commercial base of derivation and requires special development. This equipment is involved primarily with contactless heating and position control. The derivation of payloads using commercial equipment sources provides a broad and potentially cost-effective base upon which to draw. The derivation of payload equipment from commercial technologies poses other issues beyond that of the identifiable functional performance, but preliminary results on testing of selected equipment testing appear quite favorable. During this phase of the SPA study, several aspects of commercial equipment utility were assessed and considered. These included safety, packaging and structural, power conditioning (electrical/electronic), thermal and materials of construction.

  3. 21 CFR 211.65 - Equipment construction.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 4 2011-04-01 2011-04-01 false Equipment construction. 211.65 Section 211.65 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) DRUGS: GENERAL CURRENT GOOD MANUFACTURING PRACTICE FOR FINISHED PHARMACEUTICALS Equipment § 211.65...

  4. 21 CFR 211.65 - Equipment construction.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 4 2012-04-01 2012-04-01 false Equipment construction. 211.65 Section 211.65 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) DRUGS: GENERAL CURRENT GOOD MANUFACTURING PRACTICE FOR FINISHED PHARMACEUTICALS Equipment § 211.65...

  5. 21 CFR 211.65 - Equipment construction.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 4 2010-04-01 2010-04-01 false Equipment construction. 211.65 Section 211.65 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) DRUGS: GENERAL CURRENT GOOD MANUFACTURING PRACTICE FOR FINISHED PHARMACEUTICALS Equipment § 211.65...

  6. 21 CFR 211.65 - Equipment construction.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 4 2014-04-01 2014-04-01 false Equipment construction. 211.65 Section 211.65 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) DRUGS: GENERAL CURRENT GOOD MANUFACTURING PRACTICE FOR FINISHED PHARMACEUTICALS Equipment § 211.65...

  7. 21 CFR 211.65 - Equipment construction.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 4 2013-04-01 2013-04-01 false Equipment construction. 211.65 Section 211.65 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) DRUGS: GENERAL CURRENT GOOD MANUFACTURING PRACTICE FOR FINISHED PHARMACEUTICALS Equipment § 211.65...

  8. Before Buying Electronic Equipment, Consider This.

    ERIC Educational Resources Information Center

    Laakaniemi, Ray

    1980-01-01

    Discusses the purchasing of electronic equipment by journalism departments. Points out that the ideal machine for all situations does not exist, indicates that scheduling machine usage is important, suggests that purchasing bids be specific, and encourages getting as many faculty people involved in knowing how to use the equipment as possible. (TJ)

  9. 18 CFR 367.57 - Equipment.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... building accounts. (d) The cost of efficiency or other tests made subsequent to the date equipment becomes... piers and foundations that are designed to be as permanent as the buildings that house the equipment, or that are constructed as a part of the building and that cannot be removed without cutting into...

  10. 18 CFR 367.57 - Equipment.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... building accounts. (d) The cost of efficiency or other tests made subsequent to the date equipment becomes... piers and foundations that are designed to be as permanent as the buildings that house the equipment, or that are constructed as a part of the building and that cannot be removed without cutting into...

  11. 43 CFR 12.72 - Equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Equipment. 12.72 Section 12.72 Public Lands: Interior Office of the Secretary of the Interior ADMINISTRATIVE AND AUDIT REQUIREMENTS AND COST... to State and Local Governments Changes, Property, and Subawards § 12.72 Equipment. (a) Title....

  12. 14 CFR 121.549 - Flying equipment.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Flying equipment. 121.549 Section 121.549 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIR CARRIERS..., FLAG, AND SUPPLEMENTAL OPERATIONS Flight Operations § 121.549 Flying equipment. (a) The pilot...

  13. 14 CFR 121.549 - Flying equipment.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Flying equipment. 121.549 Section 121.549 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIR CARRIERS..., FLAG, AND SUPPLEMENTAL OPERATIONS Flight Operations § 121.549 Flying equipment. (a) The pilot...

  14. 14 CFR 121.549 - Flying equipment.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Flying equipment. 121.549 Section 121.549 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIR CARRIERS..., FLAG, AND SUPPLEMENTAL OPERATIONS Flight Operations § 121.549 Flying equipment. (a) The pilot...

  15. 14 CFR 121.549 - Flying equipment.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Flying equipment. 121.549 Section 121.549 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIR CARRIERS..., FLAG, AND SUPPLEMENTAL OPERATIONS Flight Operations § 121.549 Flying equipment. (a) The pilot...

  16. 14 CFR 121.549 - Flying equipment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Flying equipment. 121.549 Section 121.549 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIR CARRIERS..., FLAG, AND SUPPLEMENTAL OPERATIONS Flight Operations § 121.549 Flying equipment. (a) The pilot...

  17. 10 CFR 35.630 - Dosimetry equipment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Dosimetry equipment. 35.630 Section 35.630 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Photon Emitting Remote Afterloader Units, Teletherapy Units, and Gamma Stereotactic Radiosurgery Units § 35.630 Dosimetry equipment. (a) Except for low...

  18. Plutonium Immobilization Can Loading Equipment Review

    SciTech Connect

    Kriikku, E.; Ward, C.; Stokes, M.; Randall, B.; Steed, J.; Jones, R.; Hamilton, L.

    1998-05-01

    This report lists the operations required to complete the Can Loading steps on the Pu Immobilization Plant Flow Sheets and evaluates the equipment options to complete each operation. This report recommends the most appropriate equipment to support Plutonium Immobilization Can Loading operations.

  19. 10 CFR 600.134 - Equipment.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... following information. (i) A description of the equipment. (ii) Manufacturer's serial number, model number... shall be identified to indicate Federal ownership. (3) A physical inventory of equipment shall be taken... between quantities determined by the physical inspection and those shown in the accounting records...

  20. 41 CFR 105-72.404 - Equipment.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... the equipment. (ii) Manufacturer's serial number, model number, Federal stock number, national stock... identified to indicate Federal ownership. (3) A physical inventory of equipment shall be taken and the... quantities determined by the physical inspection and those shown in the accounting records shall...

  1. 22 CFR 226.34 - Equipment.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ..., model number, Federal stock number, national stock number, or other identification number. (iii) Source.... (3) A physical inventory of equipment shall be taken and the results reconciled with the equipment records at least once every two years. Any differences between quantities determined by the...

  2. 29 CFR 95.34 - Equipment.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... equipment. (ii) Manufacturer's serial number, model number, Federal stock number, national stock number, or... Federal ownership. (3) A physical inventory of equipment shall be taken and the results reconciled with... the physical inspection and those shown in the accounting records shall be investigated to...

  3. 40 CFR 30.34 - Equipment.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... following information. (i) A description of the equipment. (ii) Manufacturer's serial number, model number... shall be identified to indicate Federal ownership. (3) A physical inventory of equipment shall be taken... between quantities determined by the physical inspection and those shown in the accounting records...

  4. 29 CFR 1926.1090 - Equipment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 8 2010-07-01 2010-07-01 false Equipment. 1926.1090 Section 1926.1090 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Diving Equipment Procedures and Requirements §...

  5. Using ADA Tasks to Simulate Operating Equipment

    NASA Technical Reports Server (NTRS)

    DeAcetis, Louis A.; Schmidt, Oron; Krishen, Kumar

    1990-01-01

    A method of simulating equipment using ADA tasks is discussed. Individual units of equipment are coded as concurrently running tasks that monitor and respond to input signals. This technique has been used in a simulation of the space-to-ground Communications and Tracking subsystem of Space Station Freedom.

  6. Weight/balance portable test equipment

    SciTech Connect

    Whitlock, R.W.

    1994-11-03

    This document shows the general layout, and gives a part description for the weight/balance test equipment. This equipment will aid in the regulation of the leachate loading of tanker trucks. The report contains four drawings with part specifications. The leachate originates from lined trenches.

  7. 47 CFR 27.51 - Equipment authorization.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 2 2013-10-01 2013-10-01 false Equipment authorization. 27.51 Section 27.51 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES MISCELLANEOUS WIRELESS COMMUNICATIONS SERVICES Technical Standards § 27.51 Equipment authorization. (a) Each transmitter utilized...

  8. 47 CFR 27.51 - Equipment authorization.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 2 2014-10-01 2014-10-01 false Equipment authorization. 27.51 Section 27.51 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES MISCELLANEOUS WIRELESS COMMUNICATIONS SERVICES Technical Standards § 27.51 Equipment authorization. (a) Each transmitter utilized...

  9. 47 CFR 27.51 - Equipment authorization.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Equipment authorization. 27.51 Section 27.51 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES MISCELLANEOUS WIRELESS COMMUNICATIONS SERVICES Technical Standards § 27.51 Equipment authorization. (a) Each transmitter utilized...

  10. 47 CFR 27.51 - Equipment authorization.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 2 2012-10-01 2012-10-01 false Equipment authorization. 27.51 Section 27.51 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES MISCELLANEOUS WIRELESS COMMUNICATIONS SERVICES Technical Standards § 27.51 Equipment authorization. (a) Each transmitter utilized...

  11. 40 CFR 86.1434 - Equipment preparation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 20 2012-07-01 2012-07-01 false Equipment preparation. 86.1434 Section 86.1434 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED... Trucks; Certification Short Test Procedures § 86.1434 Equipment preparation. (a) Immediately prior to...

  12. 40 CFR 86.1434 - Equipment preparation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 19 2011-07-01 2011-07-01 false Equipment preparation. 86.1434 Section 86.1434 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED... Trucks; Certification Short Test Procedures § 86.1434 Equipment preparation. (a) Immediately prior to...

  13. Your Equipment Dollar, [Revised.] Money Management.

    ERIC Educational Resources Information Center

    Baran, Nancy H., Ed.; Tarrant, Sharon M., Ed.

    This booklet on household equipment, 1 in a series of 12, covers all the basic aspects of personal- and family-money management. Suitable for use by high school and college students as well as adults, this handbook offers information to help buyers purchase household equipment that is within their budget. Section 1 discusses managing equipment…

  14. Isolating USB connections in medical equipment.

    PubMed

    Broeders, Jan-Hein

    2009-01-01

    Although offering several benefits, the universal serial bus (USB) port has not been rapidly adopted for connecting medical equipment. This is because it could affect safety procedures, with equipment not operating isolated from the mains. To overcome this, a single package isolation device has been developed that can be inserted directly into the USB signal path.

  15. 24 CFR 84.34 - Equipment.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Equipment. 84.34 Section 84.34 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development UNIFORM... NON-PROFIT ORGANIZATIONS Post-Award Requirements Property Standards § 84.34 Equipment. (a) Title...

  16. 24 CFR 84.34 - Equipment.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 1 2013-04-01 2013-04-01 false Equipment. 84.34 Section 84.34 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development UNIFORM... NON-PROFIT ORGANIZATIONS Post-Award Requirements Property Standards § 84.34 Equipment. (a) Title...

  17. 24 CFR 84.34 - Equipment.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Equipment. 84.34 Section 84.34 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development UNIFORM... NON-PROFIT ORGANIZATIONS Post-Award Requirements Property Standards § 84.34 Equipment. (a) Title...

  18. 24 CFR 84.34 - Equipment.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Equipment. 84.34 Section 84.34 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development UNIFORM... NON-PROFIT ORGANIZATIONS Post-Award Requirements Property Standards § 84.34 Equipment. (a) Title...

  19. 22 CFR 226.34 - Equipment.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 22 Foreign Relations 1 2012-04-01 2012-04-01 false Equipment. 226.34 Section 226.34 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ADMINISTRATION OF ASSISTANCE AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Post-award Requirements Property Standards § 226.34 Equipment. (a) Unless the agreement...

  20. 22 CFR 226.34 - Equipment.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 22 Foreign Relations 1 2013-04-01 2013-04-01 false Equipment. 226.34 Section 226.34 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ADMINISTRATION OF ASSISTANCE AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Post-award Requirements Property Standards § 226.34 Equipment. (a) Unless the agreement...

  1. 22 CFR 226.34 - Equipment.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 22 Foreign Relations 1 2014-04-01 2014-04-01 false Equipment. 226.34 Section 226.34 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ADMINISTRATION OF ASSISTANCE AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Post-award Requirements Property Standards § 226.34 Equipment. (a) Unless the agreement...

  2. 15 CFR 24.32 - Equipment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 1 2010-01-01 2010-01-01 false Equipment. 24.32 Section 24.32 Commerce and Foreign Trade Office of the Secretary of Commerce UNIFORM ADMINISTRATIVE REQUIREMENTS FOR... subgrantees will follow paragraphs (c) through (e) of this section. (c) Use. (1) Equipment shall be used...

  3. Functioning condition monitoring of industrial equipment

    NASA Astrophysics Data System (ADS)

    Ungureanu, N. S.; Petrovan, A.; Ungureanu, M.; Alexandrescu, M.

    2017-02-01

    The paper analyses the theoretical aspects related to monitoring industrial equipment. Are treated issues that concern the choosing of industrial equipment to be monitored, the parameters to be monitored, monitoring mode (local or remote) and the mode of collection and transmission of data.

  4. 46 CFR 153.466 - Electrical equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Electrical equipment. 153.466 Section 153.466 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CERTAIN BULK DANGEROUS CARGOES SHIPS CARRYING... Requirements for Flammable Or Combustible Cargoes § 153.466 Electrical equipment. A tankship carrying...

  5. 46 CFR 153.466 - Electrical equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 5 2011-10-01 2011-10-01 false Electrical equipment. 153.466 Section 153.466 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CERTAIN BULK DANGEROUS CARGOES SHIPS CARRYING... Requirements for Flammable Or Combustible Cargoes § 153.466 Electrical equipment. A tankship carrying...

  6. 46 CFR 153.466 - Electrical equipment.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 5 2013-10-01 2013-10-01 false Electrical equipment. 153.466 Section 153.466 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CERTAIN BULK DANGEROUS CARGOES SHIPS CARRYING... Requirements for Flammable Or Combustible Cargoes § 153.466 Electrical equipment. A tankship carrying...

  7. 46 CFR 153.466 - Electrical equipment.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 5 2014-10-01 2014-10-01 false Electrical equipment. 153.466 Section 153.466 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CERTAIN BULK DANGEROUS CARGOES SHIPS CARRYING... Requirements for Flammable Or Combustible Cargoes § 153.466 Electrical equipment. A tankship carrying...

  8. 46 CFR 153.466 - Electrical equipment.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 5 2012-10-01 2012-10-01 false Electrical equipment. 153.466 Section 153.466 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CERTAIN BULK DANGEROUS CARGOES SHIPS CARRYING... Requirements for Flammable Or Combustible Cargoes § 153.466 Electrical equipment. A tankship carrying...

  9. 22 CFR 145.34 - Equipment.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Department. User charges shall be treated as program income. (e) When acquiring replacement equipment, the... include the following information. (i) A description of the equipment. (ii) Manufacturer's serial number... Government) and cost. (vi) Information from which one can calculate the percentage of Federal...

  10. 40 CFR 30.34 - Equipment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... EPA. User charges shall be treated as program income. (e) When acquiring replacement equipment, the... following information. (i) A description of the equipment. (ii) Manufacturer's serial number, model number...) Information from which one can calculate the percentage of Federal participation in the cost of the...

  11. Using Ada tasks to simulate operating equipment

    NASA Technical Reports Server (NTRS)

    Deacetis, Louis A.; Schmidt, Oron; Krishen, Kumar

    1990-01-01

    A method of simulating equipment using Ada tasks is discussed. Individual units of equipment are coded as concurrently running tasks that monitor and respond to input signals. This technique has been used in a simulation of the space-to-ground Communications and Tracking subsystem of Space Station Freedom.

  12. 29 CFR 1915.158 - Lifesaving equipment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (PPE) § 1915.158 Lifesaving equipment. (a) Personal flotation devices. (1) PFDs (life preservers, life... Equipment Specifications. (2) Prior to each use, personal floatation devices shall be inspected for dry rot... floatation devices shall not be used. (b) Ring life buoys and ladders. (1) When work is being performed on...

  13. 29 CFR 1915.158 - Lifesaving equipment.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (PPE) § 1915.158 Lifesaving equipment. (a) Personal flotation devices. (1) PFDs (life preservers, life... Equipment Specifications. (2) Prior to each use, personal floatation devices shall be inspected for dry rot... floatation devices shall not be used. (b) Ring life buoys and ladders. (1) When work is being performed on...

  14. 24 CFR 84.34 - Equipment.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... to non-Federal outside organizations for a fee that is less than private companies charge for... effect to insure adequate safeguards to prevent loss, damage, or theft of the equipment. Any loss, damage... the equipment, proper sales procedures shall be established which provide for competition to...

  15. 46 CFR 184.220 - Cooking equipment.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false Cooking equipment. 184.220 Section 184.220 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) VESSEL CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Cooking and Heating § 184.220 Cooking...

  16. 46 CFR 184.220 - Cooking equipment.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false Cooking equipment. 184.220 Section 184.220 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) VESSEL CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Cooking and Heating § 184.220 Cooking...

  17. 46 CFR 184.210 - Heating equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Heating equipment. 184.210 Section 184.210 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) VESSEL CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Cooking and Heating § 184.210 Heating...

  18. 46 CFR 184.210 - Heating equipment.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false Heating equipment. 184.210 Section 184.210 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) VESSEL CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Cooking and Heating § 184.210 Heating...

  19. 46 CFR 184.210 - Heating equipment.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false Heating equipment. 184.210 Section 184.210 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) VESSEL CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Cooking and Heating § 184.210 Heating...

  20. 46 CFR 184.220 - Cooking equipment.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false Cooking equipment. 184.220 Section 184.220 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) VESSEL CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Cooking and Heating § 184.220 Cooking...

  1. 46 CFR 184.210 - Heating equipment.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false Heating equipment. 184.210 Section 184.210 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) VESSEL CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Cooking and Heating § 184.210 Heating...

  2. 46 CFR 184.220 - Cooking equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Cooking equipment. 184.220 Section 184.220 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) VESSEL CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Cooking and Heating § 184.220 Cooking...

  3. 46 CFR 184.220 - Cooking equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Cooking equipment. 184.220 Section 184.220 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) VESSEL CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Cooking and Heating § 184.220 Cooking...

  4. Equipment for the Disabled. Volumes 1 - 4.

    ERIC Educational Resources Information Center

    Wilshere, E. Rosamond, Comp.

    Four volumes of equipment for the disabled which can simplify their lives and those who live with them are presented. The authors have not included surgical, medical, therapeutic, corrective or gymnastic equipment in the publication. Voume one includes house adaptations and planning, beds and bed accessories, chairs, and wheelchairs and…

  5. 36 CFR 1210.34 - Equipment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 3 2010-07-01 2010-07-01 false Equipment. 1210.34 Section 1210.34 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION GENERAL RULES... number, national stock number, or other identification number. (iii) Source of the equipment,...

  6. 36 CFR 1210.34 - Equipment.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 3 2012-07-01 2012-07-01 false Equipment. 1210.34 Section 1210.34 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION GENERAL RULES... number, national stock number, or other identification number. (iii) Source of the equipment,...

  7. 36 CFR 1210.34 - Equipment.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 3 2014-07-01 2014-07-01 false Equipment. 1210.34 Section 1210.34 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION GENERAL RULES... number, national stock number, or other identification number. (iii) Source of the equipment,...

  8. 40 CFR 51.358 - Test equipment.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 2 2014-07-01 2014-07-01 false Test equipment. 51.358 Section 51.358....358 Test equipment. Computerized emission test systems are required for performing an official emissions test on subject vehicles. (a) Performance features of computerized emission test systems....

  9. 47 CFR 73.712 - Equipment tests.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 4 2012-10-01 2012-10-01 false Equipment tests. 73.712 Section 73.712... International Broadcast Stations § 73.712 Equipment tests. (a) During the process of construction of an... tests for the purpose of such adjustments and measurements as may be necessary to assure compliance...

  10. 44 CFR 13.32 - Equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false Equipment. 13.32 Section 13.32 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND... LOCAL GOVERNMENTS Post-Award Requirements Changes, Property, and Subawards § 13.32 Equipment. (a)...

  11. 44 CFR 13.32 - Equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Equipment. 13.32 Section 13.32 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND... LOCAL GOVERNMENTS Post-Award Requirements Changes, Property, and Subawards § 13.32 Equipment. (a)...

  12. 41 CFR 105-71.132 - Equipment.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false Equipment. 105-71.132 Section 105-71.132 Public Contracts and Property Management Federal Property Management Regulations System...-Award Requirements/Changes, Property, and Subawards § 105-71.132 Equipment. (a) Title. Subject to...

  13. Office equipment energy use and trends

    SciTech Connect

    Piette, M.A.; Eto, J.H.; Harris, J.P.

    1991-09-01

    Office information technologies are using an increasing amount of energy in commercial buildings. During recent forecasting hearings in California, the office equipment end use has been a major source of differences among forecasts of commercial sector energy use. Not only are there major differences in forecasted load growth resulting from the energy use of office equipment, but there are also differences in interpretations of historical and base-year estimates. Understanding office equipment energy use is particularly important because office equipment is widely believed to be the fastest growing electrical end use in the fastest growing sector. This report describes the development and application of a spreadsheet to estimate current and future energy use by office equipment. We define the term office equipment'' to mean information processing technologies used in buildings. The seven categories of office equipment relate to categories found in our analysis of utility surveys and industry sales reports. These seven categories of equipment are examined for eleven types of commercial buildings.

  14. Office equipment energy use and trends

    SciTech Connect

    Piette, M.A.; Eto, J.H.; Harris, J.P.

    1991-09-01

    Office information technologies are using an increasing amount of energy in commercial buildings. During recent forecasting hearings in California, the office equipment end use has been a major source of differences among forecasts of commercial sector energy use. Not only are there major differences in forecasted load growth resulting from the energy use of office equipment, but there are also differences in interpretations of historical and base-year estimates. Understanding office equipment energy use is particularly important because office equipment is widely believed to be the fastest growing electrical end use in the fastest growing sector. This report describes the development and application of a spreadsheet to estimate current and future energy use by office equipment. We define the term ``office equipment`` to mean information processing technologies used in buildings. The seven categories of office equipment relate to categories found in our analysis of utility surveys and industry sales reports. These seven categories of equipment are examined for eleven types of commercial buildings.

  15. 47 CFR 74.452 - Equipment changes.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 4 2011-10-01 2011-10-01 false Equipment changes. 74.452 Section 74.452 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES EXPERIMENTAL RADIO....452 Equipment changes. (a) Modifications may be made to an existing authorization in accordance...

  16. 47 CFR 73.712 - Equipment tests.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 4 2011-10-01 2011-10-01 false Equipment tests. 73.712 Section 73.712... International Broadcast Stations § 73.712 Equipment tests. (a) During the process of construction of an... set forth in the Note to § 73.702(d) may, without further authority of the FCC, conduct...

  17. 15 CFR 14.34 - Equipment.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT, AND COMMERCIAL.... (3) A physical inventory of equipment shall be taken and the results reconciled with the equipment... difference. The recipient shall, in connection with the inventory, verify the existence, current...

  18. 20 CFR 435.34 - Equipment.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT ORGANIZATIONS, AND COMMERCIAL ORGANIZATIONS Post... Government must be identified to indicate Federal ownership. (3) A physical inventory of equipment must be... the inventory, verify the existence, current utilization, and continued need for the equipment. (4)...

  19. 45 CFR 74.34 - Equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... AND SUBAWARDS TO INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NONPROFIT ORGANIZATIONS, AND... physical inventory of equipment and the results reconciled with the equipment records at least once every... shall, in connection with the inventory, verify the existence, current utilization, and continued...

  20. 21 CFR 1250.67 - Watering equipment.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... of drinking water or other beverages, or for food preservation purposes, equipment constructed so as... 21 Food and Drugs 8 2012-04-01 2012-04-01 false Watering equipment. 1250.67 Section 1250.67 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES...

  1. 21 CFR 1250.67 - Watering equipment.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... of drinking water or other beverages, or for food preservation purposes, equipment constructed so as... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Watering equipment. 1250.67 Section 1250.67 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES...

  2. 21 CFR 1250.67 - Watering equipment.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... of drinking water or other beverages, or for food preservation purposes, equipment constructed so as... 21 Food and Drugs 8 2011-04-01 2011-04-01 false Watering equipment. 1250.67 Section 1250.67 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES...

  3. 21 CFR 1250.67 - Watering equipment.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... of drinking water or other beverages, or for food preservation purposes, equipment constructed so as... 21 Food and Drugs 8 2013-04-01 2013-04-01 false Watering equipment. 1250.67 Section 1250.67 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES...

  4. 21 CFR 1250.67 - Watering equipment.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... of drinking water or other beverages, or for food preservation purposes, equipment constructed so as... 21 Food and Drugs 8 2014-04-01 2014-04-01 false Watering equipment. 1250.67 Section 1250.67 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES...

  5. 46 CFR 28.405 - Hydraulic equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Operate With More Than 16 Individuals on Board § 28.405 Hydraulic equipment. (a) Each hydraulic system... than four times the system maximum operating pressure. (c) Each hydraulic system must be equipped with...) All material in a hydraulic system must be suitable for use with the hydraulic fluid used and must...

  6. 46 CFR 28.880 - Hydraulic equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... INDUSTRY VESSELS Aleutian Trade Act Vessels § 28.880 Hydraulic equipment. (a) Each hydraulic system must be... times the system's maximum operating pressure. (c) Each hydraulic system must be equipped with at least... material in a hydraulic system must be suitable for use with the hydraulic fluid used and must be of...

  7. 46 CFR 28.405 - Hydraulic equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Operate With More Than 16 Individuals on Board § 28.405 Hydraulic equipment. (a) Each hydraulic system... than four times the system maximum operating pressure. (c) Each hydraulic system must be equipped with...) All material in a hydraulic system must be suitable for use with the hydraulic fluid used and must...

  8. 46 CFR 28.880 - Hydraulic equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... INDUSTRY VESSELS Aleutian Trade Act Vessels § 28.880 Hydraulic equipment. (a) Each hydraulic system must be... times the system's maximum operating pressure. (c) Each hydraulic system must be equipped with at least... material in a hydraulic system must be suitable for use with the hydraulic fluid used and must be of...

  9. 46 CFR 121.210 - Heating equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) Each electric space heater must be provided with a thermal cutout to prevent overheating. (c) Each heater element of an electric space heater must be of an enclosed type, and the element case or jacket... SYSTEMS AND EQUIPMENT Cooking and Heating § 121.210 Heating equipment. (a) Each heater must be...

  10. 33 CFR 142.48 - Eyewash equipment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Eyewash equipment. 142.48 Section 142.48 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OUTER CONTINENTAL SHELF ACTIVITIES WORKPLACE SAFETY AND HEALTH Personal Protective Equipment § 142.48...

  11. Guidelines for Equipment To Prepare Healthy Meals.

    ERIC Educational Resources Information Center

    Nettles, Mary Frances; Carr, Deborah H.

    The National Food Service Management Institute (NFSMI) has conducted a project to develop guidelines on the type of preparation equipment needed in school kitchens to produce meals that meet the nutrition standards of the Dietary Guidelines for Americans (DGA). The guidelines provide detailed descriptions of food preparation equipment items,…

  12. Development of Equipment for Use in Sport

    ERIC Educational Resources Information Center

    James, David

    2012-01-01

    No one has ever been able to create a running shoe that can make one run faster, but in other sports the design of equipment has the potential to offer considerable enhancement. Judgement has to be made as to whether such advantage becomes unfair. This article indicates many possible sports in which the equipment plays an important part in the…

  13. 47 CFR 78.23 - Equipment tests.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 4 2014-10-01 2014-10-01 false Equipment tests. 78.23 Section 78.23 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES CABLE TELEVISION RELAY SERVICE Applications and Licenses § 78.23 Equipment tests. (a) Following the grant of a CARS license,...

  14. 47 CFR 78.23 - Equipment tests.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 4 2013-10-01 2013-10-01 false Equipment tests. 78.23 Section 78.23 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES CABLE TELEVISION RELAY SERVICE Applications and Licenses § 78.23 Equipment tests. (a) Following the grant of a CARS license,...

  15. 47 CFR 78.23 - Equipment tests.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Equipment tests. 78.23 Section 78.23 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES CABLE TELEVISION RELAY SERVICE Applications and Licenses § 78.23 Equipment tests. (a) Following the grant of a CARS license,...

  16. Farm Equipment Mechanic. Occupational Analyses Series.

    ERIC Educational Resources Information Center

    Ross, Douglas

    This analysis covers tasks performed by a farm equipment mechanic, an occupational title some provinces and territories of Canada have also identified as agricultural machinery technician, agricultural mechanic, and farm equipment service technician. A guide to analysis discusses development, structure, and validation method; scope of the…

  17. 46 CFR 129.370 - Equipment grounding.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.370 Equipment grounding. (a) On a metallic vessel each metallic enclosure and frame of electrical equipment must be permanently grounded to the hull....

  18. 46 CFR 129.370 - Equipment grounding.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.370 Equipment grounding. (a) On a metallic vessel each metallic enclosure and frame of electrical equipment must be permanently grounded to the hull....

  19. Universal null DTE (data terminal equipment)

    DOEpatents

    George, M.; Pierson, L.G.; Wilkins, M.E.

    1987-11-09

    A communication device in the form of data terminal equipment permits two data communication equipments, each having its own master clock and operating at substantially the same nominal clock rate, to communicate with each other in a multi-segment circuit configuration of a general communication network even when phase or frequency errors exist between the two clocks. Data transmitted between communication equipments of two segments of the communication network is buffered. A variable buffer fill circuit is provided to fill the buffer to a selectable extent prior to initiation of data output clocking. Selection switches are provided to select the degree of buffer preload. A dynamic buffer fill circuit may be incorporated for automatically selecting the buffer fill level as a function of the difference in clock frequencies of the two equipments. Controllable alarm circuitry is provided for selectively generating an underflow or an overflow alarm to one or both of the communicating equipments. 5 figs.

  20. Automatic monitoring of vibration welding equipment

    DOEpatents

    Spicer, John Patrick; Chakraborty, Debejyo; Wincek, Michael Anthony; Wang, Hui; Abell, Jeffrey A; Bracey, Jennifer; Cai, Wayne W

    2014-10-14

    A vibration welding system includes vibration welding equipment having a welding horn and anvil, a host device, a check station, and a robot. The robot moves the horn and anvil via an arm to the check station. Sensors, e.g., temperature sensors, are positioned with respect to the welding equipment. Additional sensors are positioned with respect to the check station, including a pressure-sensitive array. The host device, which monitors a condition of the welding equipment, measures signals via the sensors positioned with respect to the welding equipment when the horn is actively forming a weld. The robot moves the horn and anvil to the check station, activates the check station sensors at the check station, and determines a condition of the welding equipment by processing the received signals. Acoustic, force, temperature, displacement, amplitude, and/or attitude/gyroscopic sensors may be used.

  1. Development of Turbulence-Measuring Equipment

    NASA Technical Reports Server (NTRS)

    Kovasznay, Leslie S G

    1954-01-01

    Hot wire turbulence-measuring equipment has been developed to meet the more stringent requirements involved in the measurement of fluctuations in flow parameters at supersonic velocities. The higher mean speed necessitates the resolution of higher frequency components than at low speed, and the relatively low turbulence level present at supersonic speed makes necessary an improved noise level for the equipment. The equipment covers the frequency range from 2 to about 70,000 cycles per second. Constant-current operation is employed. Compensation for hot-wire lag is adjusted manually using square-wave testing to indicate proper setting. These and other features make the equipment adaptable to all-purpose turbulence work with improved utility and accuracy over that of older types of equipment. Sample measurements are given to demonstrate the performance.

  2. Equipment innovations and rules changes in sports.

    PubMed

    Krauss, Michael D

    2004-10-01

    Participation in competitive athletics carries an inherent risk for injury. The acceptable level of risk in certain sports is often a topic of considerable debate. The National Collegiate Athletic Association, and other sports governing bodies, use injury surveillance and input from coaches, administrators, officials, athletes, and sports medicine experts in considering rules and equipment changes. Equipment innovations and/or equipment rules changes may decrease the risk of injury. However, equipment and rules changes can alter the essence or style of play of a particular sport, thus possibly increasing the risk of injury. This article discusses recent changes in equipment in various sports. The reasons for change, controversy, and relevant research related to those changes are also reviewed.

  3. Radiotherapy equipment--purchase or lease?

    PubMed

    Nisbet, A; Ward, A

    2001-08-01

    Against a background of increasing demand for radiotherapy equipment, this study was undertaken to investigate options for equipment procurement, in particular to compare purchase with lease. The perceived advantages of lease are that equipment can be acquired within budget and cashflow constraints, with relatively low amounts of cash leaving the NHS in the first year, avoiding the necessity of capitalizing the equipment and providing protection against the risk of obsolescence associated with high technology equipment. The perceived disadvantages of leasing are that the Trust does not own the equipment, leasing can be more expensive in revenue terms, the tender process is extended and there may be lease conditions to be met, which may be costly and/or restrictive. There are also a number of technical considerations involved in the leasing of radiotherapy equipment that influence the financial analysis and practical operation of the radiotherapy service. The technical considerations include servicing and planned preventative maintenance, upgrades, spare parts, subsequent purchase of "add ons", modification of equipment, research and development work, commencement of the lease period, return of equipment at the end of the lease period and negotiations at the end of the lease period. A study from Raigmore Hospital, Inverness is described, which involves the procurement of new, state-of-the-art radiotherapy equipment. This provides an overview of the procurement process, including a summary of the advantages and disadvantages of leasing, with the figures from the financial analysis presented and explained. In addition, a detailed description is given of the technical considerations to be taken into account in the financial analysis and negotiation of any lease contract.

  4. 40 CFR Appendix R to Subpart G of... - Substitutes Subject to Use Restrictions Listed in the December 20, 2011 Final Rule, Effective...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... December 20, 2011 Final Rule, Effective February 21, 2012 Source: 76 FR 78855, Dec. 20, 2011, unless... manufacturers should wear appropriate personal protective equipment, including chemical goggles and protective... manufacturers should wear appropriate personal protective equipment, including chemical goggles and...

  5. Cold Atmospheric Plasma Technology for Decontamination of Space Equipment

    NASA Astrophysics Data System (ADS)

    Thomas, Hubertus; Rettberg, Petra; Shimizu, Tetsuji; Thoma, Markus; Morfill, Gregor; Zimmermann, Julia; Müller, Meike; Semenov, Igor

    2016-07-01

    Cold atmospheric plasma (CAP) technology is very fast and effective in inactivation of all kinds of pathogens. It is used in hygiene and especially in medicine, since the plasma treatment can be applied to sensitive surfaces, like skin, too. In a first study to use CAP for the decontamination of space equipment we could show its potential as a quite promising alternative to the standard "dry heat" and H2O2 methods [Shimizu et al. Planetary and Space Science, 90, 60-71. (2014)]. In a follow-on study we continue the investigations to reach high application level of the technology. First, we redesign the actual setup to a plasma-gas circulation system, increasing the effectivity of inactivation and the sustainability. Additionally, we want to learn more about the plasma chemistry processes involved in the inactivation. Therefore, we perform detailed plasma and gas measurements and compare them to numerical simulations. The latter will finally be used to scale the decontamination system to sizes useful also for larger space equipment. Typical materials relevant for space equipment will be tested and investigated on surface material changes due to the plasma treatment. Additionally, it is planned to use electronic boards and compare their functionality before and after the CAP expose. We will give an overview on the status of the plasma decontamination project funded by the Bavarian Ministry of Economics.

  6. Medicare and Medicaid programs; fire safety requirements for long term care facilities, automatic sprinkler systems. Final rule.

    PubMed

    2008-08-13

    This final rule requires all long term care facilities to be equipped with sprinkler systems by August 13, 2013. Additionally, this final rule requires affected facilities to maintain their automatic sprinkler systems once they are installed.

  7. Equipment of medical backpacks in mountain rescue.

    PubMed

    Elsensohn, Fidel; Soteras, Inigo; Resiten, Oliver; Ellerton, John; Brugger, Hermann; Paal, Peter

    2011-01-01

    We conducted a survey of equipment in medical backpacks for mountain rescuers and mountain emergency physicians. The aim was to investigate whether there are standards for medical equipment in mountain rescue organizations associated with the International Commission for Mountain Emergency Medicine (ICAR MEDCOM). A questionnaire was completed by 18 member organizations from 14 countries. Backpacks for first responders are well equipped to manage trauma, but deficiencies in equipment to treat medical emergencies were found. Paramedic and physicians' backpacks were well equipped to provide advanced life support and contained suitable drugs. We recommend that medical backpacks should be equipped in accordance with national laws, the medical emergencies in a given region, and take into account the climate, geography, medical training of rescuers, and funding of the organization. Automated external defibrillator provision should be improved. The effects of temperature on the drugs and equipment should be considered. Standards for training in the use and maintenance of medical tools should be enforced. First responders and physicians should only use familiar tools and drugs.

  8. Water-Using Equipment: Commercial and Industrial

    SciTech Connect

    Solana, Amy E.; Mcmordie, Katherine

    2006-01-24

    Water is an important aspect of many facets in energy engineering. While the previous article detailed domestic related water-using equipment such as toilets and showerheads, this article focuses on various types of water-using equipment in commercial and industrial facilities, including commercial dishwashers and laundry, single-pass cooling equipment, boilers and steam generators, cooling towers, and landscape irrigation. Opportunities for water and energy conservation are explained, including both technology retrofits and operation and maintenance changes. Water management planning and leak detection are also included as they are essential to a successful water management program.

  9. Subsea equipment marriage is top ROV priority

    SciTech Connect

    Redden, J.

    1985-04-01

    Interfacing subsea equipment with remotely operated vehicles (ROV's) and the further development of arctic-class units are the primary challenges facing manufacturers. Worldwide use of the ROV for drilling support has exploded during this decade as oil companies continue their search in deeper waters. If the unmanned vehicles are to become an even more integral tool of the oilman, experts say they must be able to perform more complex tasks. The evolution of more multi-purpose ROVs, however, hinges on the redesigning of subsea equipment. The severe limitations on subsea support (by ROVs) is the obsolete design associated with the subsea equipment itself. These limitations are discussed.

  10. Incidents of chemical reactions in cell equipment

    SciTech Connect

    Baldwin, N.M.; Barlow, C.R.

    1991-12-31

    Strongly exothermic reactions can occur between equipment structural components and process gases under certain accident conditions in the diffusion enrichment cascades. This paper describes the conditions required for initiation of these reactions, and describes the range of such reactions experienced over nearly 50 years of equipment operation in the US uranium enrichment program. Factors are cited which can promote or limit the destructive extent of these reactions, and process operations are described which are designed to control the reactions to minimize equipment damage, downtime, and the possibility of material releases.

  11. NAFTA opportunities: Electrical equipment and power generation

    SciTech Connect

    Not Available

    1993-01-01

    The North American Free Trade Agreement (NAFTA) provides significant commercial opportunities in Mexico and Canada for the United States electric equipment and power generation industries, through increased goods and services exports to the Federal Electricity Commission (CFE) and through new U.S. investment in electricity generation facilities in Mexico. Canada and Mexico are the United States' two largest export markets for electrical equipment with exports of $1.53 billion and $1.51 billion, respectively, in 1992. Canadian and Mexican markets represent approximately 47 percent of total U.S. exports of electric equipment. The report presents an economic analysis of the section.

  12. The role of equipment in endoscopic complications.

    PubMed

    Suchanek, Stepan; Grega, Tomas; Zavoral, Miroslav

    2016-10-01

    The role of the surrounding equipment in endoscopic complications has not been published widely. However, an adequate understanding of the advantages and disadvantages of such devices might be helpful to avoid unnecessary problems during endoscopy. This is an overview of the basic principles, benefits and possible harms of electrical power units, medical gases and vital sign monitoring equipment. The aim of this review is to summarize current knowledge about the approach to the electrosurgical unit settings; periprocedural precautions, minimizing the risk of interference between endoscopic equipment and other electrical devices; the appropriate selection of instruments regarding the electrosurgical outcome and the role of carbon dioxide, argon plasma coagulation, pulse oximetry and capnography.

  13. Long Length Contaminated Equipment Maintenance Plan

    SciTech Connect

    ESVELT, C.A.

    2000-02-01

    The purpose of this document is to provide the maintenance requirements of the Long Length Contaminated Equipment (LLCE) trailers and provide a basis for the maintenance frequencies selected. This document is applicable to the LLCE Receiver trailer and Transport trailer assembled by Mobilized Systems Inc. (MSI). Equipment used in conjunction with, or in support of, these trailers is not included. This document does not provide the maintenance requirements for checkout and startup of the equipment following the extended lay-up status which began in the mid 1990s. These requirements will be specified in other documentation.

  14. 46 CFR 153.208 - Ballast equipment.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Requirements § 153.208 Ballast equipment. (a) Except for the arrangement described in paragraph (b) of this... prescribed in paragraph (d) of this section, pumps, piping, vent lines, overflow tubes and sounding...

  15. Hazard Analysis. Football: Activity and Related Equipment.

    ERIC Educational Resources Information Center

    1974

    Data on football injuries acquired from surveillance sources and in-depth investigations are presented. Results of the study are summarized by descriptions of the accident sequence, diagnosis of the injury, and specific equipment involved in the injury. (JD)

  16. 40 CFR 264.32 - Required equipment.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... handled at the facility could require a particular kind of equipment specified below: (a) An internal communications or alarm system capable of providing immediate emergency instruction (voice or signal) to...

  17. 40 CFR 264.32 - Required equipment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... handled at the facility could require a particular kind of equipment specified below: (a) An internal communications or alarm system capable of providing immediate emergency instruction (voice or signal) to...

  18. 40 CFR 264.32 - Required equipment.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... handled at the facility could require a particular kind of equipment specified below: (a) An internal communications or alarm system capable of providing immediate emergency instruction (voice or signal) to...

  19. 40 CFR 264.32 - Required equipment.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... handled at the facility could require a particular kind of equipment specified below: (a) An internal communications or alarm system capable of providing immediate emergency instruction (voice or signal) to...

  20. 40 CFR 264.32 - Required equipment.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... handled at the facility could require a particular kind of equipment specified below: (a) An internal communications or alarm system capable of providing immediate emergency instruction (voice or signal) to...