Sample records for equipment selection operating

  1. Justification of parameters and selection of equipment for laboratory researches of a rammer's operating element dynamics in a soil foundation of a tank for oil and oil products storage

    NASA Astrophysics Data System (ADS)

    Gruzin, A. V.; Gruzin, V. V.; Shalay, V. V.

    2017-08-01

    The development of technology for a directional soil compaction of tank foundations for oil and oil products storage is a relevant problem which solution will enable simultaneously provide required operational characteristics of a soil foundation and reduce time and material costs to prepare the foundation. The impact dynamics of rammers' operating elements on the soil foundation is planned to specify in the course of laboratory studies. A specialized technique is developed to justify the parameters and select the equipment for laboratory researches. The usage of this technique enabled us to calculate dimensions of the models, of a test bench and specifications of the recording equipment, and a lighting system. The necessary equipment for laboratory studies was selected. Preliminary laboratory tests were carried out. The estimate of accuracy for planned laboratory studies was given.

  2. The Selection and Placement Method of Materialized Views on Big Data Platform of Equipment Condition Assessment

    NASA Astrophysics Data System (ADS)

    Ma, Yan; Yao, Jinxia; Gu, Chao; Chen, Yufeng; Yang, Yi; Zou, Lida

    2017-05-01

    With the formation of electric big data environment, more and more big data analyses emerge. In the complicated data analysis on equipment condition assessment, there exist many join operations, which are time-consuming. In order to save time, the approach of materialized view is usually used. It places part of common and critical join results on external storage and avoids the frequent join operation. In the paper we propose the methods of selecting and placing materialized views to reduce the query time of electric transmission and transformation equipment, and make the profits of service providers maximal. In selection method we design a computation way for the value of non-leaf node based on MVPP structure chart. In placement method we use relevance weights to place the selected materialized views, which help reduce the network transmission time. Our experiments show that the proposed selection and placement methods have a high throughput and good optimization ability of query time for electric transmission and transformation equipment.

  3. Study on the Selection of Equipment Suppliers for Wind Power Generation EPC Project

    NASA Astrophysics Data System (ADS)

    Yang, Yuanyue; Li, Huimin

    2017-12-01

    In the EPC project, the purchase cost of equipments accounted for about 60% of the total project cost, thus, the selection of equipment suppliers has an important influence on the EPC project. This paper, took EPC project for the phase I engineering of Guizhou Huaxi Yunding wind power plant as research background, constructed the evaluation index system for the selection of equipment suppliers for wind power generation EPC project from multiple perspectives, and introduced matter-element extension evaluation model to evaluate the selection of equipment suppliers for this project from the qualitative and quantitative point of view. The result is consistent with the actual situation, which verifies the validity and operability of this method.

  4. 21 CFR 111.30 - What requirements apply to automated, mechanical, or electronic equipment?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... PRACTICE IN MANUFACTURING, PACKAGING, LABELING, OR HOLDING OPERATIONS FOR DIETARY SUPPLEMENTS Equipment and... dietary supplement, you must: (a) Design or select equipment to ensure that dietary supplement...

  5. 21 CFR 111.30 - What requirements apply to automated, mechanical, or electronic equipment?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... PRACTICE IN MANUFACTURING, PACKAGING, LABELING, OR HOLDING OPERATIONS FOR DIETARY SUPPLEMENTS Equipment and... dietary supplement, you must: (a) Design or select equipment to ensure that dietary supplement...

  6. Energy Saving Melting and Revert Reduction Technology: Melting Efficiency in Die Casting Operations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    David Schwam

    2012-12-15

    This project addressed multiple aspects of the aluminum melting and handling in die casting operations, with the objective of increasing the energy efficiency while improving the quality of the molten metal. The efficiency of melting has always played an important role in the profitability of aluminum die casting operations. Consequently, die casters need to make careful choices in selecting and operating melting equipment and procedures. The capital cost of new melting equipment with higher efficiency can sometimes be recovered relatively fast when it replaces old melting equipment with lower efficiency. Upgrades designed to improve energy efficiency of existing equipment maymore » be well justified. Energy efficiency is however not the only factor in optimizing melting operations. Melt losses and metal quality are also very important. Selection of melting equipment has to take into consideration the specific conditions at the die casting shop such as availability of floor space, average quantity of metal used as well as the ability to supply more metal during peaks in demand. In all these cases, it is essential to make informed decisions based on the best available data.« less

  7. Universal null DTE (data terminal equipment)

    DOEpatents

    George, M.; Pierson, L.G.; Wilkins, M.E.

    1987-11-09

    A communication device in the form of data terminal equipment permits two data communication equipments, each having its own master clock and operating at substantially the same nominal clock rate, to communicate with each other in a multi-segment circuit configuration of a general communication network even when phase or frequency errors exist between the two clocks. Data transmitted between communication equipments of two segments of the communication network is buffered. A variable buffer fill circuit is provided to fill the buffer to a selectable extent prior to initiation of data output clocking. Selection switches are provided to select the degree of buffer preload. A dynamic buffer fill circuit may be incorporated for automatically selecting the buffer fill level as a function of the difference in clock frequencies of the two equipments. Controllable alarm circuitry is provided for selectively generating an underflow or an overflow alarm to one or both of the communicating equipments. 5 figs.

  8. Whole-body vibration and postural stress among operators of construction equipment: a literature review.

    PubMed

    Kittusamy, N Kumar; Buchholz, Bryan

    2004-01-01

    Operators of construction equipment perform various duties at work that expose them to a variety of risk factors that may lead to health problems. A few of the health hazards among operators of construction equipment are: (a) whole-body vibration, (b) awkward postural requirements (including static sitting), (c) dust, (d) noise, (e) temperature extremes, and (f) shift work. It has been suggested that operating engineers (OEs) are exposed to two important risk factors for the development of musculoskeletal disorders: whole-body vibration and non-neutral body postures. This review evaluates selected papers that have studied exposure to whole-body vibration and awkward posture among operators of mobile equipment. There have been only few studies that have specifically examined exposure of these risk factors among operators of construction equipment. Thus other studies from related industry and equipment were reviewed as applicable. In order to better understand whole-body vibration and postural stress among OEs, it is recommended that future studies are needed in evaluating these risk factors among OEs.

  9. Flat-panel display solutions for ground-environment military displays (Invited Paper)

    NASA Astrophysics Data System (ADS)

    Thomas, J., II; Roach, R.

    2005-05-01

    Displays for military vehicles have very distinct operational and cost requirements that differ from other military applications. These requirements demand that display suppliers to Army and Marine ground-environments provide low cost equipment that is capable of operation across environmental extremes. Inevitably, COTS components form the foundation of these "affordable" display solutions. This paper will outline the major display requirements and review the options that satisfy conflicting and difficult operational demands, using newly developed equipment as an example. Recently, a new supplier was selected for the Drivers Vision Enhancer (DVE) equipment, including the Display Control Module (DCM). The paper will outline the DVE and describe development of a new DCM solution. The DVE programme, with several thousand units presently in service and operational in conflicts such as "Operation Iraqi Freedom", represents a critical balance between cost and performance. We shall describe design considerations that include selection of COTS sources, the need to minimise display modification; video interfaces, power interfaces, operator interfaces and new provisions to optimise displayed video content.

  10. Analysis of remote operating systems for space-based servicing operations. Volume 2: Study results

    NASA Technical Reports Server (NTRS)

    1985-01-01

    The developments in automation and robotics have increased the importance of applications for space based servicing using remotely operated systems. A study on three basic remote operating systems (teleoperation, telepresence and robotics) was performed in two phases. In phase one, requirements development, which consisted of one three-month task, a group of ten missions were selected. These included the servicing of user equipment on the station and the servicing of the station itself. In phase two, concepts development, which consisted of three tasks, overall system concepts were developed for the selected missions. These concepts, which include worksite servicing equipment, a carrier system, and payload handling equipment, were evaluated relative to the configurations of the overall worksite. It is found that the robotic/teleoperator concepts are appropriate for relatively simple structured tasks, while the telepresence/teleoperator concepts are applicable for missions that are complex, unstructured tasks.

  11. Universal null DTE

    DOEpatents

    George, Michael; Pierson, Lyndon G.; Wilkins, Mark E.

    1989-01-01

    A communication device in the form of data terminal equipment permits two data communication equipments, each having its own master clock and operating at substantially the same nominal clock rate, to communicate with each other in a multi-segment circuit configuration of a general communication network even when phase or frequency errors exist between the two clocks. Data transmitted between communication equipments of two segments of the communication network is buffered. A variable buffer fill circuit is provided to fill the buffer to a selectable extent prior to initiation of data output clocking. Selection switches are provided to select the degree of buffer preload. A dynamic buffer fill circuit may be incorporated for automatically selecting the buffer fill level as a function of the difference in clock frequencies of the two equipments. Controllable alarm circuitry is provided for selectively generating an underflow or an overflow alarm to one or both of the communicating equipments.

  12. Equipment of the binary-cycle geothermal power unit at the Pauzhet geothermal power station

    NASA Astrophysics Data System (ADS)

    Tomarov, G. V.; Nikol'skii, A. I.; Semenov, V. N.; Shipkov, A. A.

    2014-06-01

    The equipment of and technological processes in the pilot industrial model of the domestically produced binary-cycle geothermal power unit operating on the discharge separate at the Pauzhet geothermal power station are considered. The development principles, the design and operational features, and the data on selecting the metal in manufacturing the main equipment of the 2.5-MW binary power unit of the geothermal power station are described.

  13. Aircraft Enroute Command and Control Comms Redesign Mechanical Documentation

    DTIC Science & Technology

    2015-12-01

    and power equipment is secured. Custom racks , with 8 server rack bays, are mounted to the pallet, with 2 desk stations for equipment operators...conventional rack equipment. Equipment in the original system was larger and heavier than the new equipment selected for the NG-JC2S. Battery backup was...purposes. The equipment also needed to be easily removable in the event of equipment failure. Surplus rack space available in the NG-JC2S system allowed

  14. Nuclear Technology. Course 32: Nondestructive Examination (NDE) Techniques II. Module 32-4, Operation of Magnetic Particle Test Equipment.

    ERIC Educational Resources Information Center

    Groseclose, Richard

    This fourth in a series of six modules for a course titled Nondestructive Examination (NDE) Techniques II describes the specific technique variables and options which are available to the test technician, provides instructions for selecting and operating the appropriate test equipment, describes physical criteria for detectable discontinuities,…

  15. A Review of International Space Station Habitable Element Equipment Offgassing Characteristics

    NASA Technical Reports Server (NTRS)

    Perry, Jay L.

    2010-01-01

    Crewed spacecraft trace contaminant control employs both passive and active methods to achieve acceptable cabin atmospheric quality. Passive methods include carefully selecting materials of construction, employing clean manufacturing practices, and minimizing systems and payload operational impacts to the cabin environment. Materials selection and manufacturing processes constitute the first level of equipment offgassing control. An element-level equipment offgassing test provides preflight verification that passive controls have been successful. Offgassing test results from multiple International Space Station (ISS) habitable elements and cargo vehicles are summarized and implications for active contamination control equipment design are discussed

  16. Sustainable reduction of bioreactor contamination in an industrial fermentation pilot plant.

    PubMed

    Junker, Beth; Lester, Michael; Leporati, James; Schmitt, John; Kovatch, Michael; Borysewicz, Stan; Maciejak, Waldemar; Seeley, Anna; Hesse, Michelle; Connors, Neal; Brix, Thomas; Creveling, Eric; Salmon, Peter

    2006-10-01

    Facility experience primarily in drug-oriented fermentation equipment (producing small molecules such as secondary metabolites, bioconversions, and enzymes) and, to a lesser extent, in biologics-oriented fermentation equipment (producing large molecules such as recombinant proteins and microbial vaccines) in an industrial fermentation pilot plant over the past 15 years is described. Potential approaches for equipment design and maintenance, operational procedures, validation/verification testing, medium selection, culture purity/sterility analysis, and contamination investigation are presented, and those approaches implemented are identified. Failure data collected for pilot plant operation for nearly 15 years are presented and best practices for documentation and tracking are outlined. This analysis does not exhaustively discuss available design, operational and procedural options; rather it selectively presents what has been determined to be beneficial in an industrial pilot plant setting. Literature references have been incorporated to provide background and context where appropriate.

  17. Selecting an oxygen plant for a copper smelter modernization

    NASA Astrophysics Data System (ADS)

    Larson, Kenneth H.; Hutchison, Robert L.

    1994-10-01

    The selection of an oxygen plant for the Cyprus Miami smelter modernization project began with a good definition of the use requirements and the smelter process variables that can affect oxygen demand. To achieve a reliable supply of oxygen with a reasonable amount of capital, critical equipment items were reviewed and reliability was added through the use of installed spares, purchase of insurance spare parts or the installation of equipment design for 50 percent of the production design such that the plant could operate with one unit while the other unit is being maintained. The operating range of the plant was selected to cover variability in smelter oxygen demand, and it was recognized that the broader operating range sacrificed about two to three percent in plant power consumption. Careful consideration of the plant "design point" was important to both the capital and operating costs of the plant, and a design point was specified that allowed a broad range of operation for maximum flexibility.

  18. Visual feedback system to reduce errors while operating roof bolting machines

    PubMed Central

    Steiner, Lisa J.; Burgess-Limerick, Robin; Eiter, Brianna; Porter, William; Matty, Tim

    2015-01-01

    Problem Operators of roof bolting machines in underground coal mines do so in confined spaces and in very close proximity to the moving equipment. Errors in the operation of these machines can have serious consequences, and the design of the equipment interface has a critical role in reducing the probability of such errors. Methods An experiment was conducted to explore coding and directional compatibility on actual roof bolting equipment and to determine the feasibility of a visual feedback system to alert operators of critical movements and to also alert other workers in close proximity to the equipment to the pending movement of the machine. The quantitative results of the study confirmed the potential for both selection errors and direction errors to be made, particularly during training. Results Subjective data confirmed a potential benefit of providing visual feedback of the intended operations and movements of the equipment. Impact This research may influence the design of these and other similar control systems to provide evidence for the use of warning systems to improve operator situational awareness. PMID:23398703

  19. Survey report on the state-of-the-art of cryogenic thermometry and signal conditioners and their potential for standardized space hardware

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The possibility of standard low temperature detector(s) for use in upcoming cryogenically cooled satellite and Space Shuttle Payloads was investigated. These payloads operate from .3 Kelvin to 300 Kelvin. Standard detectors were selected and matching signal conditioning equipment were specified. This equipment will operate in a spacecraft environment and be compatible with the selected detector, typical spacecraft voltages, typical spacecraft telemetry systems, and the radiation encountered by a typical earth orbiting spacecraft. Work statements to better define and advance detector performance are presented.

  20. 75 FR 39251 - Control of Air Pollution From New Motor Vehicles: Announcement of Public Workshop for Heavy-Duty...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-08

    ...A public workshop is being held to discuss the operation of heavy-duty engines equipped with selective catalyst reduction (SCR). EPA will be reviewing its policies regarding the operation of SCR- equipped heavy-duty diesel engines without diesel exhaust fluid (DEF), with improper DEF, or when tampering (or some other defect in the SCR system) is detected.

  1. Methodology for reducing energy and resource costs in construction of trenchless crossover of pipelines

    NASA Astrophysics Data System (ADS)

    Toropov, V. S.

    2018-05-01

    The paper suggests a set of measures to select the equipment and its components in order to reduce energy costs in the process of pulling the pipeline into the well in the constructing the trenchless pipeline crossings of various materials using horizontal directional drilling technology. A methodology for reducing energy costs has been developed by regulating the operation modes of equipment during the process of pulling the working pipeline into a drilled and pre-expanded well. Since the power of the drilling rig is the most important criterion in the selection of equipment for the construction of a trenchless crossover, an algorithm is proposed for calculating the required capacity of the rig when operating in different modes in the process of pulling the pipeline into the well.

  2. Spacelab simulation using a Lear Jet aircraft: Mission no. 4 (ASSESS program)

    NASA Technical Reports Server (NTRS)

    Reller, J. O., Jr.; Neel, C. B.; Mason, R. H.

    1975-01-01

    The fourth ASSESS Spacelab simulation mission utilizing a Lear Jet aircraft featured trained experiment operators (EOs) in place of the participating scientists, to simulate the role and functions of payload specialists in Spacelab who may conduct experiments developed by other scientists. The experiment was a broadband infrared photometer coupled to a 30-cm, open port, IR telescope. No compromises in equipment design or target selection were made to simplify operator tasks; the science goals of the mission were selected to advance the mainline research program of the principle investigator (PI). Training of the EOs was the responsibility of the PI team and consisted of laboratory sessions, on-site training during experiment integration, and integrated mission training using the aircraft as a high-fidelity simulator. The EO permission experience in these several disciplines proved adequate for normal experiment operations, but marginal for the identification and remedy of equipment malfunctions. During the mission, the PI utilized a TV communication system to assist the EOs to overcome equipment difficulties; both science and operations were successfully implemented.

  3. Skylab astronaut life support assembly

    NASA Technical Reports Server (NTRS)

    Brown, J. T.

    1972-01-01

    A comparative study was performed to define an optimum portable life support system for suited operations inside and outside the Skylab Program. Emphasis was placed on utilization of qualified equipment, modified versions of qualified equipment, and new systems made up to state-of-the-art components. Outlined are the mission constraints, operational modes, and evaluation ground rules by which the Skylab portable life support system was selected and the resulting design.

  4. Selecting and Equipping a Home Workshop. Capsules 1-5. Teacher's Guide [and] Student Material.

    ERIC Educational Resources Information Center

    Sack, Richard

    This unit of study provides teaching guidelines and student material intended for use in high school advanced industrial arts programs. The objective is to help students plan and purchase equipment for a home workshop. A necessary prerequisite is a knowledge of the operations and uses of the equipment involved. The material is divided into five…

  5. Hard Facts.

    ERIC Educational Resources Information Center

    Shaw, Richard

    1998-01-01

    Discusses the selection of floor-care equipment so that the equipment's features and performance attributes can match their intended purposes. Offers tips such as buying only composite-material buckets and wringers, choosing cleaning machines with good maintenance track records, and buying automatic scrubbers that can operate in both large and…

  6. HOW TO SELECT THE PROPER SECURITY AND EQUIPMENT SURVEILLANCE SYSTEMS TO PROTECT YOUR FACILITIES.

    ERIC Educational Resources Information Center

    Honeywell, Inc., Minneapolis, Minn.

    IN PRESENTING A SURVEY OF MODERN SECURITY SYSTEMS, THIS BOOKLET DISCUSSES THE REQUIREMENTS FOR SURVEILLANCE AND PROTECTION OF AREAS, PERIMETER, AND OBJECTS. A VARIETY OF EQUIPMENT IS DESCRIBED WITH DISCUSSION OF OPERATING PROCEDURES, COSTS, AND RECENT DEVELOPMENTS IN SECURITY SYSTEMS. (JT)

  7. Cost estimation and analysis using the Sherpa Automated Mine Cost Engineering System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stebbins, P.E.

    1993-09-01

    The Sherpa Automated Mine Cost Engineering System is a menu-driven software package designed to estimate capital and operating costs for proposed surface mining operations. The program is engineering (as opposed to statistically) based, meaning that all equipment, manpower, and supply requirements are determined from deposit geology, project design and mine production information using standard engineering techniques. These requirements are used in conjunction with equipment, supply, and labor cost databases internal to the program to estimate all associated costs. Because virtually all on-site cost parameters are interrelated within the program, Sherpa provides an efficient means of examining the impact of changesmore » in the equipment mix on total capital and operating costs. If any aspect of the operation is changed, Sherpa immediately adjusts all related aspects as necessary. For instance, if the user wishes to examine the cost ramifications of selecting larger trucks, the program not only considers truck purchase and operation costs, it also automatically and immediately adjusts excavator requirements, operator and mechanic needs, repair facility size, haul road construction and maintenance costs, and ancillary equipment specifications.« less

  8. 49 CFR 240.125 - Criteria for testing knowledge.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... practices for the safe operation of trains. (c) The testing methods selected by the railroad shall be: (1) Designed to examine a person's knowledge of the railroad's rules and practices for the safe operation of...) Personal safety practices; (ii) Operating practices; (iii) Equipment inspection practices; (iv) Train...

  9. Worker safety and injury severity analysis of earthmoving equipment accidents.

    PubMed

    Kazan, Emrah; Usmen, Mumtaz A

    2018-06-01

    Research on construction worker safety associated with construction equipment has mostly focused on accident type rather than injury severity and the embedded factor relationships. Significant variables and their effects on the degree of injury are examined for earthmoving equipment using data from OSHA. Four types of equipment, backhoe, bulldozer, excavator, and scraper are included in the study. Accidents involving on-foot workers and equipment operators are investigated collectively, as well as separately. Cross tabulation analysis was conducted to establish the associations between selected categorical variables, using degree of injury as a dichotomous dependent variable (fatal vs. nonfatal) and a number of independent variables having different values. Odds ratios were calculated to determine how much a certain variable/factor increases the odds of fatality in an accident, and the odds ratios were ranked to determine the relative impact of a given factor. It was found that twelve variables were significantly associated with injury severity. Rankings based on odds ratios showed that inadequate safety training (2.54), missing equipment protective system (2.38), being a non-union worker (2.26), being an equipment operator (1.93), and being on or around inadequately maintained equipment (1.58) produced higher odds for fatality. A majority of the earthmoving equipment accidents resulted in fatality. Backhoes were the most common equipment involved in accidents and fatalities. Struck-by accidents were the most prevalent and most fatal. Non-OSHA compliant safety training, missing seatbelt, operator not using seatbelt, malfunctioning back-up alarms, and poorly maintained equipment were factors contributing to accidents and fatalities. On-foot workers experienced a higher number of accidents than operators, while fatality odds were higher for the operators. Practical applications: Safety professionals should benefit from our findings in planning and delivering training and providing oversight to workers in earthmoving equipment operations. Copyright © 2018 National Safety Council and Elsevier Ltd. All rights reserved.

  10. DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    The study was conducted to determine the pollutants of concern in the Istanbul metropolitan area, monitoring equipment specifications and monitoring and data analysis procedures for an air quality and meteorological monitoring program. This volume consists of: (1) Introduction; (2) Selection of Pollutants of Concern; (3) Selection of Monitoring Locations; (4) Equipment Specifications; (5) Site Preparation and Security; (6) Standard Operating Procedures; (7) Data Reduction and Analysis; (8) Future Phases; (9) References. Also included are Attachments A through G and List of Tables and List of Figures.

  11. Some Current Issues in the Design of Flight Training Devices.

    ERIC Educational Resources Information Center

    Prophet, Wallace W.; And Others

    The rationale is developed that training equipment should be selected or designed to furnish what the student needs to know and to be able to do to perform successfully on the operational job. Several considerations relevant to training equipment design from the systems engineering standpoint are examined. Suggested design features based upon…

  12. Ontology-Based Gap Analysis for Technology Selection: A Knowledge Management Framework for the Support of Equipment Purchasing Processes

    NASA Astrophysics Data System (ADS)

    Macris, Aristomenis M.; Georgakellos, Dimitrios A.

    Technology selection decisions such as equipment purchasing and supplier selection are decisions of strategic importance to companies. The nature of these decisions usually is complex, unstructured and thus, difficult to be captured in a way that will be efficiently reusable. Knowledge reusability is of paramount importance since it enables users participate actively in process design/redesign activities stimulated by the changing technology selection environment. This paper addresses the technology selection problem through an ontology-based approach that captures and makes reusable the equipment purchasing process and assists in identifying (a) the specifications requested by the users' organization, (b) those offered by various candidate vendors' organizations and (c) in performing specifications gap analysis as a prerequisite for effective and efficient technology selection. This approach has practical appeal, operational simplicity, and the potential for both immediate and long-term strategic impact. An example from the iron and steel industry is also presented to illustrate the approach.

  13. Military Curricula for Vocational & Technical Education. Petroleum Equipment and Technical Operations, QM0142, 19-5.

    ERIC Educational Resources Information Center

    Ohio State Univ., Columbus. National Center for Research in Vocational Education.

    This subcourse containg lesson assignments, lesson texts, and programmed reviews covers the most frequently used equipment for transporting and storing petroleum products from the time they are purchased until they are consumed by the user. The course is one of a number of military-developed curriculum packages selected for adaptation to…

  14. Engineering Guide for Fire Protection and Detection Systems at Army Ammunition Plants. Volume 1. Selection and Design

    DTIC Science & Technology

    1980-12-01

    type of personnel likely to he using them, (3) the physical environment , (4) health and operational safety considerations. Carefully selected portable...operated apparatus must have the battery and energy-limiting components located outside the hazardous environment , and be so constructed that a direct...designate effect on equipment or personnel), based upon the most severe result of personnel error, procedural deficiencies, environment , design

  15. Technology survey of electrical power generation and distribution for MIUS application

    NASA Technical Reports Server (NTRS)

    Gill, W. L.; Redding, T. E.

    1975-01-01

    Candidate electrical generation power systems for the modular integrated utility systems (MIUS) program are described. Literature surveys were conducted to cover both conventional and exotic generators. Heat-recovery equipment associated with conventional power systems and supporting equipment are also discussed. Typical ranges of operating conditions and generating efficiencies are described. Power distribution is discussed briefly. Those systems that appear to be applicable to MIUS have been indicated, and the criteria for equipment selection are discussed.

  16. Improving machine operation management efficiency via improving the vehicle park structure and using the production operation information database

    NASA Astrophysics Data System (ADS)

    Koptev, V. Yu

    2017-02-01

    The work represents the results of studying basic interconnected criteria of separate equipment units of the transport network machines fleet, depending on production and mining factors to improve the transport systems management. Justifying the selection of a control system necessitates employing new methodologies and models, augmented with stability and transport flow criteria, accounting for mining work development dynamics on mining sites. A necessary condition is the accounting of technical and operating parameters related to vehicle operation. Modern open pit mining dispatching systems must include such kinds of the information database. An algorithm forming a machine fleet is presented based on multi-variation task solution in connection with defining reasonable operating features of a machine working as a part of a complex. Proposals cited in the work may apply to mining machines (drilling equipment, excavators) and construction equipment (bulldozers, cranes, pile-drivers), city transport and other types of production activities using machine fleet.

  17. Methodologies for processing plant material into acceptable food on a small scale

    NASA Technical Reports Server (NTRS)

    Parks, Thomas R.; Bindon, John N.; Bowles, Anthony J. G.; Golbitz, Peter; Lampi, Rauno A.; Marquardt, Robert F.

    1994-01-01

    Based on the Controlled Environment Life Support System (CELSS) production of only four crops, wheat, white potatoes, soybeans, and sweet potatoes; a crew size of twelve; a daily planting/harvesting regimen; and zero-gravity conditions, estimates were made on the quantity of food that would need to be grown to provide adequate nutrition; and the corresponding amount of biomass that would result. Projections were made of the various types of products that could be made from these crops, the unit operations that would be involved, and what menu capability these products could provide. Equipment requirements to perform these unit operations were screened to identify commercially available units capable of operating (or being modified to operate) under CELSS/zero-gravity conditions. Concept designs were developed for those equipment needs for which no suitable units were commercially available. Prototypes of selected concept designs were constructed and tested on a laboratory scale, as were selected commercially available units. This report discusses the practical considerations taken into account in the various design alternatives, some of the many product/process factors that relate to equipment development, and automation alternatives. Recommendations are made on both general and specific areas in which it was felt additional investigation would benefit CELSS missions.

  18. 46 CFR 111.51-1 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... continuity of service for equipment vital to the propulsion, control or safety of the vessel under short-circuit conditions through coordination and selective operation of overcurrent protective devices. ...

  19. Skylab Medical Experiments Altitude Test /SMEAT/ facility design and operation.

    NASA Technical Reports Server (NTRS)

    Hinners, A. H., Jr.; Correale, J. V.

    1973-01-01

    This paper presents the design approaches and test facility operation methods used to successfully accomplish a 56-day test for Skylab to permit evaluation of selected Skylab medical experiments in a ground test simulation of the Skylab environment with an astronaut crew. The systems designed for this test include the two-gas environmental control system, the fire suppression and detection system, equipment transfer lock, ground support equipment, safety systems, potable water system, waste management system, lighting and power system, television monitoring, communications and recreation systems, and food freezer.

  20. Hazardous Waste Minimization Assessment: Fort Campbell, Kentucky

    DTIC Science & Technology

    1991-03-01

    Used Oii - Better Operating Practices . Selective Segregation 97 Used Oil - Process Change - Fast Lube Oil Change System (FLOCS) 98 Caustic Wastes...Product Substitution 98 Caustic Wastes - Process Change - Hot Tank (Equipment) Modifications 98 Aqueous or Caustic Wastes - Process Change - Dry Ovens...Aqueous or Caustic Wastes - Equipment Leasiag 102 Dirty Rags/Uniforms • Onsite/Offsite Recycling - Laundry Service 103 Treatment 103 Used Oil - Onsite

  1. Selected Energy Management Options for Small Business and Local Government.

    ERIC Educational Resources Information Center

    Wert, Jonathan M.; Worthington, Barry K.

    This document is a checklist of 257 energy management options for small business and local government. The energy management options are categorized under: (1) Energy management strategies; (2) Buildings; (3) Lighting; (4) Water; (5) Waste operations; (6) Equipment; (7) Transportation; and (8) Food preparation. To select options for…

  2. Completion techniques for horizontal wells in the Pearsall Austin Chalk

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pope, C.D.; Handren, P.J.

    1992-05-01

    Oryx Energy Co. used three basic completion techniques and various combinations of them to complete 20 horizontal wells in the Pearsall Austin Chalk. The completion method selected is based on a general set of guidelines. In this paper additionally, equipment selection and various types of workover operations are reviewed.

  3. Program management aid for redundancy selection and operational guidelines

    NASA Technical Reports Server (NTRS)

    Hodge, P. W.; Davis, W. L.; Frumkin, B.

    1972-01-01

    Although this criterion was developed specifically for use on the shuttle program, it has application to many other multi-missions programs (i.e. aircraft or mechanisms). The methodology employed is directly applicable even if the tools (nomographs and equations) are for mission peculiar cases. The redundancy selection criterion was developed to insure that both the design and operational cost impacts (life cycle costs) were considered in the selection of the quantity of operational redundancy. These tools were developed as aids in expediting the decision process and not intended as the automatic decision maker. This approach to redundancy selection is unique in that it enables a pseudo systems analysis to be performed on an equipment basis without waiting for all designs to be hardened.

  4. Energy Monitoring and Control Systems Operator Training - Recommended Qualifications, Staffing, Job Description, and Training Requirements for EMCS Operators.

    DTIC Science & Technology

    1982-06-01

    start/stop chiller optimization , and demand limiting were added. The system monitors a 7,000 ton chiller plant and controls 74 air handlers. The EMCS does...Modify analog limits. g. Adjust setpoints of selected controllers. h. Select manual or automatic control modes. i. Enable and disable individual points...or event schedules and controller setpoints ; make nonscheduled starts and stops of equipment or disable field panels when required for routine

  5. Factors influencing equipment selection in electron beam processing

    NASA Astrophysics Data System (ADS)

    Barnard, J. W.

    2003-08-01

    During the eighties and nineties accelerator manufacturers dramatically increased the beam power available for high-energy equipment. This effort was directed primarily at meeting the demands of the sterilization industry. During this era, the perception that bigger (higher power, higher energy) was always better prevailed since the operating and capital costs of accelerators did not increase with power and energy as fast as the throughput. High power was needed to maintain per unit costs low for treatment. This philosophy runs counter to certain present-day realities of the sterilization business as well as conditions influencing accelerator selection in other electron beam applications. Recent experience in machine selection is described and factors affecting choice are presented.

  6. Data acquisition, remote control and equipment monitoring for ISOLDE RILIS

    NASA Astrophysics Data System (ADS)

    Rossel, R. E.; Fedosseev, V. N.; Marsh, B. A.; Richter, D.; Rothe, S.; Wendt, K. D. A.

    2013-12-01

    With a steadily increasing on-line operation time up to a record 3000 h in the year 2012, the Resonance Ionization Laser Ion Source (RILIS) is one of the key components of the ISOLDE on-line isotope user facility at CERN. Ion beam production using the RILIS is essential for many experiments due to the unmatched combination of ionization efficiency and selectivity. To meet the reliability requirements the RILIS is currently operated in shift duty for continuous maintenance of crucial laser parameters such as wavelength, power, beam position and timing, as well as ensuring swift intervention in case of an equipment malfunction. A recent overhaul of the RILIS included the installation of new pump lasers, commercial dye lasers and a complementary, fully solid-state titanium:sapphire laser system. The framework of the upgrade also required the setup of a network-extended, LabVIEW-based system for data acquisition, remote control and equipment monitoring, to support RILIS operators as well as ISOLDE users. The system contributes to four key aspects of RILIS operation: equipment monitoring, machine protection, automated self-reliance, and collaborative data acquisition. The overall concept, technologies used, implementation status and recent applications during the 2012 on-line operation period will be presented along with a summary of future developments.

  7. Measurement instruments for automatically monitoring the water chemistry of reactor coolant at nuclear power stations equipped with VVER reactors. Selection of measurement instruments and experience gained from their operation at Russian and foreign NPSs

    NASA Astrophysics Data System (ADS)

    Ivanov, Yu. A.

    2007-12-01

    An analytical review is given of Russian and foreign measurement instruments employed in a system for automatically monitoring the water chemistry of the reactor coolant circuit and used in the development of projects of nuclear power stations equipped with VVER-1000 reactors and the nuclear station project AES 2006. The results of experience gained from the use of such measurement instruments at nuclear power stations operating in Russia and abroad are presented.

  8. Signal Analysis Van Hardware Operation General Description. Volume 1.

    DTIC Science & Technology

    1981-12-01

    safety and the prevention of equip- ment malfunction in high RF energy fields, a shielded enclosure was installed within the semitrailer shell. This...Clock B can be prgram -selected to operate at one of seven clock rates, one of five crystal-controlled frequencies (1 MHz, 100 kHz, 10 kHz, or 100 Hz

  9. Technoeconomic analysis of conventional logging systems operating from stump to landing

    Treesearch

    Raymond L. Sarles; William G. Luppold; William G. Luppold

    1986-01-01

    Analyzes technical and economic factors for six conventional logging systems suitable for operation in eastern forests. Discusses financial risks and business implications for loggers investing in high-production, state-of-the-art logging systems. Provides logging contractors with information useful as a preliminary guide for selection of equipment and systems....

  10. Conceptual design of equipment to excavate and transport regolith from the lunar maria

    NASA Technical Reports Server (NTRS)

    Detwiler, Mark; Foong, Chee Seng; Stocklin, Catherine

    1990-01-01

    NASA hopes to have a manned lunar outpost completed by 2005. In order to establish the base, regolith must be excavated from the lunar surface. Regolith will be used as a source for life-supporting elements and as radiation shielding for the lunar outpost. The design team from the University of Texas at Austin designed excavation and transportation equipment for initial operations of the lunar base. The design team also characterized the elements to be found in the regolith and determined the power required to excavate regolith. The characterization of the soil was based on a literature review of lunar geography. Power requirements for excavation were developed by adapting terrestrial equations for excavation power requirements and adapting them to lunar soil conditions. The design of the excavation and transportation equipment was broken into three functions: loosing, collecting, and transporting. A scarifier was selected to loosen, a bucket was selected to collect, and a load-haul system was selected to transport. The functions are powered by a modular fuel cell powered vehicle that provides power for motion of the equipment.

  11. Experience reveals ways to minimize failures in rod-pumped wells

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patterson, J.C.; Bucaram, S.M.; Curfew, J.V.

    From the experience gained over the past 25 years, ARCO Oil and Gas Co. has developed recommendations to reduce equipment failure in sucker-rod pumping installations. These recommendations include equipment selection and design, operating procedures, and chemical treatment. Equipment failure and its attendant costs are extremely important in today's petroleum industry. Because rod pumping is the predominant means of artificial lift, minimizing equipment failure in rod pumped wells can have a significant impact on profitability. This compilation of recommendations comes from field locations throughout the US and other countries. The goal is to address and solve problems on a well-by-well basis.

  12. Integrated orbital servicing study follow-on. Volume 2: Technical analysis and system design

    NASA Technical Reports Server (NTRS)

    1978-01-01

    In-orbit service functional and physical requirements to support both low and high Earth orbit servicing/maintenance operations were defined, an optimum servicing system configuration was developed and mockups and early prototype hardware were fabricated to demonstrate and validate the concepts selected. Significant issues addressed include criteria for concept selection; representative mission equipment and approaches to their design for serviceability; significant serviceable spacecraft design aspects; servicer mechanism operation in one-g; approaches for the demonstration/simulation; and service mechanism structure design approach.

  13. Low energy stage study. Volume 3: Conceptual design, interface analysis, flight and ground operations. [launching space shuttle payloads

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Low energy conceptual stage designs and adaptations to existing/planned shuttle upper stages were developed and their performance established. Selected propulsion modes and subsystems were used as a basis to develop airborne support equipment (ASE) design concepts. Orbiter installation and integration (both physical and electrical interfaces) were defined. Low energy stages were adapted to the orbiter and ASE interfaces. Selected low energy stages were then used to define and describe typical ground and flight operations.

  14. Design and optimization of integrated gas/condensate plants

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Root, C.R.; Wilson, J.L.

    1995-11-01

    An optimized design is demonstrated for combining gas processing and condensate stabilization plants into a single integrated process facility. This integrated design economically provides improved condensate recovery versus use of a simple stabilizer design. A selection matrix showing likely application of this integrated process is presented for use on future designs. Several methods for developing the fluid characterization and for using a process simulator to predict future design compositions are described, which could be useful in other designs. Optimization of flowsheet equipment choices and of design operating pressures and temperatures is demonstrated including the effect of both continuous and discretemore » process equipment size changes. Several similar designs using a turboexpander to provide refrigeration for liquids recovery and stabilizer reflux are described. Operating overthrust and from the P/15-D platform in the Dutch sector of the North Sea has proven these integrated designs are effective. Concerns do remain around operation near or above the critical pressure that should be addressed in future work including providing conservative separator designs, providing sufficient process design safety margin to meet dew point specifications, selecting the most conservative design values of predicted gas dew point and equipment size calculated with different Equations-of-State, and possibly improving the accuracy of PVT calculations in the near critical area.« less

  15. Does your equipment maintenance management program measure up?

    PubMed

    Deinstadt, Deborah C

    2003-01-01

    Identifying a clear maintenance philosophy is the first step toward choosing the right program for your healthcare organization. The second step is gaining a clear understanding of how proposed savings and improvements will be delivered. The third and last step is requiring that the proposed company or manager have specific tools in place for measuring and analyzing program performance. There are three primary philosophies underlying current equipment management options. These include risk-transfer philosophy (e.g., maintenance insurance, service contracts, multi-vendor and outsource programs), asset management philosophy (e.g., programs delivering a management system based on managed time-and-materials), and internal management (in-house managed programs). The last step in selecting the right program is insisting that proper performance measurements be built into the proposed management program. A well-managed program provides results in three general areas: financial outcomes, operational improvements and process improvements. Financial outcomes are the easiest to measure. Operational and process improvements are more challenging to assess but equally important to the program's overall success. To accurately identify results in these three areas, the overall management program should measure the following eight separate components: procedures and support for department staff; equipment inventory, benchmark costs, and budget guidelines; experienced equipment support team; objective, independent analysis of maintenance events; repair documentation and reporting; vendor relations; equipment acquisition analysis; and recommendations for improvement. Do everything you reasonably can to assure that the selected company can work side-by-side with you, providing objective, measurable advice that is ultimately in your best interest. You will then know that you have been thorough in your marketplace selection and can confidently move into implementation, expecting tangible and successful results.

  16. Evaluating Moisture Control of Variable-Capacity Heat Pumps in Mechanically Ventilated, Low-Load Homes in Climate Zone 2A

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Martin, Eric; Withers, Chuck; McIlvaine, Janet

    Low-load homes can present a challenge when selecting appropriate space-conditioning equipment. Conventional, fixed-capacity heating and cooling equipment is often oversized for small homes, causing increased first costs and operating costs. This report evaluates the performance of variable-capacity comfort systems, with a focus on inverter-driven, variable-capacity systems, as well as proposed system enhancements.

  17. The new Waste Law: Challenging opportunity for future landfill operation in Indonesia.

    PubMed

    Meidiana, Christia; Gamse, Thomas

    2011-01-01

    The Waste Law No. 18/2008 Article 22 and 44 require the local governments to run environmentally sound landfill. Due to the widespread poor quality of waste management in Indonesia, this study aimed to identify the current situation by evaluating three selected landfills based on the ideal conditions of landfill practices, which are used to appraise the capability of local governments to adapt to the law. The results indicated that the local governments have problems of insufficient budget, inadequate equipment, uncollected waste and unplanned future landfill locations. All of the selected landfills were partially controlled landfills with open dumping practices predominating. In such inferior conditions the implementation of sanitary landfill is not necessarily appropriate. The controlled landfill is a more appropriate solution as it offers lower investment and operational costs, makes the selection of a new landfill site unnecessary and can operate with a minimum standard of infrastructure and equipment. The sustainability of future landfill capacity can be maintained by utilizing the old landfill as a profit-oriented landfill by implementing a landfill gas management or a clean development mechanism project. A collection fee system using the pay-as-you-throw principle could increase the waste income thereby financing municipal solid waste management.

  18. Performance of on-site Medical waste disinfection equipment in hospitals of Tabriz, Iran

    PubMed Central

    Taghipour, Hassan; Alizadeh, Mina; Dehghanzadeh, Reza; Farshchian, Mohammad Reza; Ganbari, Mohammad; Shakerkhatibi, Mohammad

    2016-01-01

    Background: The number of studies available on the performance of on-site medical waste treatment facilities is rare, to date. The aim of this study was to evaluate the performance of onsite medical waste treatment equipment in hospitals of Tabriz, Iran. Methods: A various range of the on-site medical waste disinfection equipment (autoclave, chemical disinfection, hydroclave, and dry thermal treatment) was considered to select 10 out of 22 hospitals in Tabriz to be included in the survey. The apparatus were monitored mechanically, chemically, and biologically for a six months period in all of the selected hospitals. Results: The results of the chemical monitoring (Bowie-Dick tests) indicated that 38.9% of the inspected autoclaves had operational problems in pre-vacuum, air leaks, inadequate steam penetration into the waste, and/or vacuum pump. The biological indicators revealed that about 55.55% of the samples were positive. The most of applied devices were not suitable for treating anatomical, pharmaceutical, cytotoxic, and chemical waste. Conclusion: Although on-site medical waste treating facilities have been installed in all the hospitals, the most of infectious-hazardous medical waste generated in the hospitals were deposited into a municipal solid waste landfill, without enough disinfection. The responsible authorities should stringently inspect and evaluate the operation of on-site medical waste treating equipment. An advanced off-site central facility with multi-treatment and disinfection equipment and enough capacity is recommended as an alternative. PMID:27766238

  19. Performance of on-site Medical waste disinfection equipment in hospitals of Tabriz, Iran.

    PubMed

    Taghipour, Hassan; Alizadeh, Mina; Dehghanzadeh, Reza; Farshchian, Mohammad Reza; Ganbari, Mohammad; Shakerkhatibi, Mohammad

    2016-01-01

    Background: The number of studies available on the performance of on-site medical waste treatment facilities is rare, to date. The aim of this study was to evaluate the performance of onsite medical waste treatment equipment in hospitals of Tabriz, Iran. Methods: A various range of the on-site medical waste disinfection equipment (autoclave, chemical disinfection, hydroclave, and dry thermal treatment) was considered to select 10 out of 22 hospitals in Tabriz to be included in the survey. The apparatus were monitored mechanically, chemically, and biologically for a six months period in all of the selected hospitals. Results: The results of the chemical monitoring (Bowie-Dick tests) indicated that 38.9% of the inspected autoclaves had operational problems in pre-vacuum, air leaks, inadequate steam penetration into the waste, and/or vacuum pump. The biological indicators revealed that about 55.55% of the samples were positive. The most of applied devices were not suitable for treating anatomical, pharmaceutical, cytotoxic, and chemical waste. Conclusion: Although on-site medical waste treating facilities have been installed in all the hospitals, the most of infectious-hazardous medical waste generated in the hospitals were deposited into a municipal solid waste landfill, without enough disinfection. The responsible authorities should stringently inspect and evaluate the operation of on-site medical waste treating equipment. An advanced off-site central facility with multi-treatment and disinfection equipment and enough capacity is recommended as an alternative.

  20. (3) Development of composite adsorbents for high decontamination and their selective adsorption properties

    NASA Astrophysics Data System (ADS)

    Mimura, Hitoshi; Yamagishi, Isao

    In an action for the convergence of the Fukushima Daiichi Nuclear Power Plant accident, the completion of Step 2 was declared in last December, 2011. As for the circulating cooling system supporting the cold shutdown of nuclear reactor, the temporary treatment equipment operation maintains stability. On the other hand, the establishment of permanent equipments, safety storage, treatment and disposal for the secondary solid wastes are urgent subjects. This special issue deals with the development of highly functional composite adsorbents and the evaluation of selective adsorption properties. The technical issues for the stable treatment and disposal of solid wastes are further discussed.

  1. Methods and apparatus for cooling electronics

    DOEpatents

    Hall, Shawn Anthony; Kopcsay, Gerard Vincent

    2014-12-02

    Methods and apparatus are provided for choosing an energy-efficient coolant temperature for electronics by considering the temperature dependence of the electronics' power dissipation. This dependence is explicitly considered in selecting the coolant temperature T.sub.0 that is sent to the equipment. To minimize power consumption P.sub.Total for the entire system, where P.sub.Total=P.sub.0+P.sub.Cool is the sum of the electronic equipment's power consumption P.sub.0 plus the cooling equipment's power consumption P.sub.Cool, P.sub.Total is obtained experimentally, by measuring P.sub.0 and P.sub.Cool, as a function of three parameters: coolant temperature T.sub.0; weather-related temperature T.sub.3 that affects the performance of free-cooling equipment; and computational state C of the electronic equipment, which affects the temperature dependence of its power consumption. This experiment provides, for each possible combination of T.sub.3 and C, the value T.sub.0* of T.sub.0 that minimizes P.sub.Total. During operation, for any combination of T.sub.3 and C that occurs, the corresponding optimal coolant temperature T.sub.0* is selected, and the cooling equipment is commanded to produce it.

  2. Operator dermal exposure and protection provided by personal protective equipment and working coveralls during mixing/loading, application and sprayer cleaning in vineyards.

    PubMed

    Thouvenin, Isabelle; Bouneb, Françoise; Mercier, Thierry

    2017-06-01

    The efficiency of a working coverall combined with personal protective equipment to protect operators against dermal exposure to plant protection products under field conditions was studied. Operators wore a non-certified water-repellent finish polyester/cotton coverall plus a certified gown during the mixing/loading and the cleaning phases. Insecticide foliar application to a vineyard was selected as the exposure scenario. The overall dermal residue levels measured in this study were in the range of data recently collected in Europe. The water-repellent finish working coverall reduced body exposure by a factor of approximately 95%. Wearing a Category III Type 3 partial body gown during mixing/loading and cleaning of the application equipment led to a further protective effect of 98.7%. The combination of a water-repellent finish working coverall and partial body protection during specific tasks provided satisfactory levels of protection and can be considered as suitable protection for the conditions of use studied.

  3. Alternatives to ozone depleting refrigerants in test equipment

    NASA Technical Reports Server (NTRS)

    Hall, Richard L.; Johnson, Madeleine R.

    1995-01-01

    This paper describes the initial results of a refrigerant retrofit project at the Aerospace Guidance and Metrology Center (AGMC) at Newark Air Force Base, Ohio. The objective is to convert selected types of test equipment to properly operate on hydrofluorocarbon (HFC) alternative refrigerants, having no ozone depleting potential, without compromising system reliability or durability. This paper discusses the primary technical issues and summarizes the test results for 17 different types of test equipment: ten environmental chambers, two ultralow temperature freezers, two coolant recirculators, one temperature control unit, one vapor degreaser, and one refrigerant recovery system. The postconversion performance test results have been very encouraging: system capacity and input power remained virtually unchanged. In some cases, the minimum operating temperature increased by a few degrees as a result of the conversion, but never beyond AGMC's functional requirements.

  4. Current trends in small vocabulary speech recognition for equipment control

    NASA Astrophysics Data System (ADS)

    Doukas, Nikolaos; Bardis, Nikolaos G.

    2017-09-01

    Speech recognition systems allow human - machine communication to acquire an intuitive nature that approaches the simplicity of inter - human communication. Small vocabulary speech recognition is a subset of the overall speech recognition problem, where only a small number of words need to be recognized. Speaker independent small vocabulary recognition can find significant applications in field equipment used by military personnel. Such equipment may typically be controlled by a small number of commands that need to be given quickly and accurately, under conditions where delicate manual operations are difficult to achieve. This type of application could hence significantly benefit by the use of robust voice operated control components, as they would facilitate the interaction with their users and render it much more reliable in times of crisis. This paper presents current challenges involved in attaining efficient and robust small vocabulary speech recognition. These challenges concern feature selection, classification techniques, speaker diversity and noise effects. A state machine approach is presented that facilitates the voice guidance of different equipment in a variety of situations.

  5. Incident management assistance patrols - assessment of benefits/costs, route selection, and prioritization : final report.

    DOT National Transportation Integrated Search

    2016-09-21

    The North Carolina Department of Transportation's (NCDOTs) Incident Management Assistance Patrol (IMAP) program provides a critically important service to North Carolinas traveling public. The highly trained and well-equipped IMAP operators pro...

  6. Image Display And Manipulation System (IDAMS), user's guide

    NASA Technical Reports Server (NTRS)

    Cecil, R. W.

    1972-01-01

    A combination operator's guide and user's handbook for the Image Display and Manipulation System (IDAMS) is reported. Information is presented to define how to operate the computer equipment, how to structure a run deck, and how to select parameters necessary for executing a sequence of IDAMS task routines. If more detailed information is needed on any IDAMS program, see the IDAMS program documentation.

  7. Sortie laboratory, phase B technical summary. [design and operational requirements

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The design and operational requirements which evolved from Sortie Lab (SL) analysis are summarized. A source of requirements for systems is given along with experimental support for the SL, baseline. Basic design data covered include: configuration definition, mission analysis, experimental integration, safety, and logistics. A technical summary outlines characteristics which reflect the influence of the growth in SL capability and the results of the mission and operational analysis. Each of the selected areas is described in terms of objectives, equipment, operational concept, and support requirements.

  8. Surveillance for unattended gas compressor stations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stastny, F.J.

    1974-06-01

    Surveillance devices in unattended compressor stations include those which detect trespassing by unauthorized personnel and those which protect the major operating equipment from damage and/or self-destruction. The latter monitor the critical operating parameters of major equipment and shut down the equipment when these parameters are exceeded; a table presents a function monitor and control list for such devices. Detection and apprehension of unauthorized personnel is a subject of increasing importance to guarantee station operability for reliable service and yet minimize staff personnel. An effective intrusion-detection system must (1) pinpoint the location and indicate the nature of the intrusion and (2)more » detect and respond rapidly to give security personnel a reasonable probability of apprehending or deterring the intruder before damage is done. The 2nd requirement is most difficult to satisfy when the facility is in a remote location, as is usually the case. Some of the parameters to consider in selecting an intrusion-detection system include concealment, legality, active vs. passive detector, back-up power, weather conditions, reliability, maintenance, discrimination, and compromising by intruders. Types of detectors include photo cell, infrared and radio frequency, audio,vibration, taut wire, circuit continuity, radar, and closed-circuit TV. The numerous types of devices and systems available provide sufficient diversity to enable a company to select a single device or a hybrid system which would incorporate several different devices for protecting unattended facilities.« less

  9. Eddy current inspection tool which is selectively operable in a discontinuity detection mode and a discontinuity magnitude mode

    DOEpatents

    Petrini, Richard R.; Van Lue, Dorin F.

    1983-01-01

    A miniaturized inspection tool, for testing and inspection of metal objects in locations with difficult accessibility, which comprises eddy current sensing equipment (12) with a probe coil (11), and associated coaxial coil cable (13), coil energizing means (21), and circuit means (21, 12) responsive to impedance changes in the coil as effected by induced eddy currents in a test object to produce a data output signal proportional to such changes. The coil and cable are slideably received in the utility channel of the flexible insertion tube 17 of fiberoptic scope 10. The scope 10 is provided with light transmitting and receiving fiberoptics for viewing through the flexible tube, and articulation means (19, 20) for articulating the distal end of the tube and permitting close control of coil placement relative to a test object. The eddy current sensing equipment includes a tone generator 30 for generating audibly signals responsive to the data output signal. In one selected mode of operation, the tone generator responsive to the output signal above a selected level generates a constant single frequency tone for signalling detection of a discontinuity and, in a second selected mode, generates a tone whose frequency is proportional to the difference between the output signal and a predetermined selected threshold level.

  10. Eddy current inspection tool which is selectively operable in a discontinuity detection mode and a discontinuity magnitude mode

    DOEpatents

    Petrini, R.R.; Van Lue, D.F.

    1983-10-25

    A miniaturized inspection tool, for testing and inspection of metal objects in locations with difficult accessibility, which comprises eddy current sensing equipment with a probe coil, and associated coaxial coil cable, coil energizing means, and circuit means responsive to impedance changes in the coil as effected by induced eddy currents in a test object to produce a data output signal proportional to such changes. The coil and cable are slideably received in the utility channel of the flexible insertion tube of fiberoptic scope. The scope is provided with light transmitting and receiving fiberoptics for viewing through the flexible tube, and articulation means for articulating the distal end of the tube and permitting close control of coil placement relative to a test object. The eddy current sensing equipment includes a tone generator 30 for generating audibly signals responsive to the data output signal. In one selected mode of operation, the tone generator responsive to the output signal above a selected level generates a constant single frequency tone for signaling detection of a discontinuity and, in a second selected mode, generates a tone whose frequency is proportional to the difference between the output signal and a predetermined selected threshold level. 5 figs.

  11. Comparative analysis of heat pump and biomass boiler for small detached house heating

    NASA Astrophysics Data System (ADS)

    Olkowski, Tomasz; Lipiński, Seweryn; Olędzka, Aneta

    2017-10-01

    The purpose of the work is to answer the question - which of the two selected heat sources is more economically beneficial for small detached house: heat pump or biomass boiler fuelled with wood-pellets? The comparative analysis of these sources was carried out to discuss the issue. First, cost of both, equipment and operation of selected heat systems were analysed. Additionally, CO2 emission levels associated with these heat systems were determined. The comparative analysis of the costs of both considered heat systems showed that equipment cost of heat pump system is considerably bigger than the cost of biomass boiler system. The comparison of annual operation costs showed that heat pump operation cost is slightly lower than operation cost of biomass boiler. The analysis of above results shows that lower operation cost of heat pump in comparison with biomass boiler cost lets qualify heat pump as more economically justified only after 38 years of work. For both analysed devices, CO2 emission levels were determined. The considerations take into account the fact that heat pump consumes electricity. It is mostly generated through combustion of coal in Poland. The results show that in Poland biomass boiler can be described as not only more economically justified system but also as considerably more ecological.

  12. Case studies from Oman for coiled tubing deployed completion techniques

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Taylor, R.W.; Conrad, B.

    1996-09-01

    Although the use of ultra-large coiled tubing to complete wells is relatively new, it is gaining widespread industry application. This paper will detail the equipment necessary to perform an operation of this type and will present information from several case studies in Oman in which an operator has successfully deployed completion equipment on 3-1/2-inch-OD coiled tubing. In addition to a discussion of the equipment required to perform the necessary operations, the trial parameters that were established by this operator will be given. The information presented has been selected to allow an initial evaluation to be made of coiled tubing completionsmore » in general and will help to determine whether this method can prove to be less expensive than traditional rig-based completions. The topics presented have been chosen to provide the reader with a thorough understanding of the techniques and preparation needed to execute a coiled tubing completion. The summary of experiences will conclude that this innovative completion technique can be a viable method for completing wells. Although long-term advantages regarding production and well maintenance cannot yet be determined, the operator`s experiences to date have confirmed his initial belief that use of coiled tubing in ultra-large continuous-pipe applications can be cost effective.« less

  13. Development and Evaluation of Vocational Competency Measures. Final Report.

    ERIC Educational Resources Information Center

    Chalupsky, Albert B.; And Others

    A series of occupational competency tests representing all seven vocational education curriculum areas were developed, field tested, and validated. Seventeen occupations were selected for competency test development: agricultural chemicals applications technician, farm equipment mechanic, computer operator, word processing specialist, apparel…

  14. Rail transit fare collection: Policy and technology assessment

    NASA Technical Reports Server (NTRS)

    Deshpande, G. K.; Cucchissi, J.; Heft, R. C.

    1982-01-01

    The impact of fare policies and fare structure on the selection of equipment was investigated, fare collection systems are described, hardware and technology related problems are documented, and the requirements of a fare collection simulation model are outlined. Major findings include: (1) a wide variation in the fare collection systems and equipment, caused primarily by historical precedence; (2) the reliability of AFC equipment used at BART and WMATA discouraged other properties from considering use of similar equipment; (3) existing equipment may not meet the fare collection needs of properties in the near future; (4) the cost of fare collection operation and maintenance is high; and (5) the relatively small market in fare collection equipment discourages new product development by suppliers. Recommendations for fare collection R&D programs include development of new hardware to meet rail transit needs, study of impacts of alternate fare policies increased communication among policymakers, and consensus on fare policy issues.

  15. Pesticide-sampling equipment, sample-collection and processing procedures, and water-quality data at Chicod Creek, North Carolina, 1992

    USGS Publications Warehouse

    Manning, T.K.; Smith, K.E.; Wood, C.D.; Williams, J.B.

    1994-01-01

    Water-quality samples were collected from Chicod Creek in the Coastal Plain Province of North Carolina during the summer of 1992 as part of the U.S. Geological Survey's National Water-Quality Assessment Program. Chicod Creek is in the Albemarle-Pamlico drainage area, one of four study units designated to test equipment and procedures for collecting and processing samples for the solid-phase extraction of selected pesticides, The equipment and procedures were used to isolate 47 pesticides, including organonitrogen, carbamate, organochlorine, organophosphate, and other compounds, targeted to be analyzed by gas chromatography/mass spectrometry. Sample-collection and processing equipment equipment cleaning and set-up procedures, methods pertaining to collecting, splitting, and solid-phase extraction of samples, and water-quality data resulting from the field test are presented in this report Most problems encountered during this intensive sampling exercise were operational difficulties relating to equipment used to process samples.

  16. Load drop evaluation for TWRS FSAR

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Julyk, L.J.; Ralston, G.L.

    1996-09-30

    Operational or remediation activities associated with existing underground high-level waste storage tank structures at the Hanford Site often require the installation/removal of various equipment items. To gain tank access for installation or removal of this equipment, large concrete cover blocks must be removed and reinstalled in existing concrete pits above the tanks. An accidental drop of the equipment or cover blocks while being moved over the tanks that results in the release of contaminants to the air poses a potential risk to onsite workers or to the offsite public. To minimize this potential risk, the use of critical lift hoistingmore » and rigging procedures and restrictions on lift height are being considered during development of the new tank farm Basis for Interim Operation and Final Safety Analysis Report. The analysis contained herein provides information for selecting the appropriate lift height restrictions for these activities.« less

  17. Statistical analysis of field data for aircraft warranties

    NASA Astrophysics Data System (ADS)

    Lakey, Mary J.

    Air Force and Navy maintenance data collection systems were researched to determine their scientific applicability to the warranty process. New and unique algorithms were developed to extract failure distributions which were then used to characterize how selected families of equipment typically fails. Families of similar equipment were identified in terms of function, technology and failure patterns. Statistical analyses and applications such as goodness-of-fit test, maximum likelihood estimation and derivation of confidence intervals for the probability density function parameters were applied to characterize the distributions and their failure patterns. Statistical and reliability theory, with relevance to equipment design and operational failures were also determining factors in characterizing the failure patterns of the equipment families. Inferences about the families with relevance to warranty needs were then made.

  18. Criteria for Selecting Types of Foreign-Language Laboratory Systems. ERIC Focus Reports on the Teaching of Foreign Languages, Number 20.

    ERIC Educational Resources Information Center

    Hutchinson, Joseph C.; Hutchinson, June O.

    Focusing on the current status of the language laboratory in instructional use, this report stresses the need to employ a systems approach in the selection and operation of laboratory equipment. The author points out the interrelatedness of the key factors in any system, including: (1) people, (2) method, (3) instructional materials, (4)…

  19. Laundering in space - A summary of recent developments.

    NASA Technical Reports Server (NTRS)

    Houck, O. K.; Symons, J. J.

    1973-01-01

    Clothing must be washed and reused on future long duration space missions to maintain personal hygiene without severe weight penalties of stored clothing. Laundering equipment that may operate in the absence of gravity is being developed. Weight savings expected from this equipment are illustrated in this paper that describes a six-man combined clothes washer/dryer engineering prototype. Also included in the paper is the rationale used in selecting the final prototype design as well as a discussion of major factors affecting design and performance.

  20. An overview of turbomachinery project in Malaysian oil and gas industry

    NASA Astrophysics Data System (ADS)

    Abd. Rahman Sabri, Harris; Rahim, Abd. Rahman Abdul; Yew, Wong Kuan; Ismail, Syuhaida

    2017-12-01

    Being the most demanding, challenging and exciting engineering and technological advances has provided escalated interests amongst the engineers at large to venture into the oil and gas (O&G) industry. Although claimed as the most expensive industry in the world via the utilisation of critical equipments, the O&G industry is still recording notorius failures in its project management especially due to turbomachinery issues, the heart equipment of any O&G project. Therefore, it is important for this paper to review turbomachinery project as one of the long lead items during project executions that is also proven to be the most costly and expensive equipment. This paper therefore discusses the gaps in turbomachinery studies via literature review in highlighting its application in O&G projects. It is found that the main components of turbomachinery are driver and driven equipment, which are applied for mechanical equipment, Electric Power Generation and heat generation for Combined Cycled Configuration. Important variables for turbomachinery selection include: (1) process requirement; (2) site location; (3) driver selection; (4) equipment sparing philosophy; (5) efficiency and reliability; (6) operability and maintainability; and (7) cost. It is hoped that this paper would lead to the successful project management of turbomachinery in the O&G industry.

  1. Characterization of stormwater at selected South Carolina Department of Transportation maintenance yards and section shed facilities in Ballentine, Conway, and North Charleston, South Carolina, 2010-12

    USGS Publications Warehouse

    Journey, Celeste A.; Conlon, Kevin J.

    2014-01-01

    Increased impervious surfaces (driveways, parking lots, and buildings) and human activities (residential, industrial, and commercial) have been linked to substantial changes in both the quality and quantity of stormwater on a watershed scale (Brabec and others, 2002; Pitt and Maestre, 2005). Small-scale storage and equipment repair facilities increase impervious surfaces that prevent infiltration of stormwater, and these facilities accommodate activities that can introduce trace metals, organic compounds, and other contaminants to the facility’s grounds. Thus, these small facilities may contribute pollutants to the environment during storm events (U.S. Environmental Protection Agency, 1992). The South Carolina Department of Transportation (SCDOT) operates section shed and maintenance yard facilities throughout the State. Prior to this investigation, the SCDOT had no data to define the quality of stormwater leaving these facilities. To provide these data, the U.S. Geological Survey (USGS), in cooperation with the SCDOT, conducted an investigation to identify and quantify constituents that are transported in stormwater from two maintenance yards and a section shed in three different areas of South Carolina. The two maintenance yards, in North Charleston and Conway, S.C., were selected because they represent facilities where equipment and road maintenance materials are stored and complete equipment repair operations are conducted. The section shed, in Ballentine, S.C., was selected because it is a facility that stores equipment and road maintenance material. Characterization of the constituents that were transported in stormwater from these representative SCDOT maintenance facilities may be used by the SCDOT in the development of stormwater management plans for similar section shed and maintenance yard facilities throughout the State to improve stormwater quality.

  2. Quiet Short-Haul Research Airplane (QSRA) model select panel functional description

    NASA Technical Reports Server (NTRS)

    Watson, D. M.

    1982-01-01

    The QSRA, when equipped with programmable color cathode ray tube displays, a head up display, a general purpose digital computer and a microwave landing system receiver, will provide a capability to do handling qualities studies and terminal area operating systems experiments as well as to enhance an experimenter's ability to obtain repeatable aircraft performance data. The operating systems experiments include the capability to generate minimum fuel approach and departure paths and to conduct precision approaches to a STOLport runway. The mode select panel is designed to provide both the flexibility needed for a variety of flight test experiments and the minimum workload operation required by pilots flying into congested terminal traffic areas.

  3. Application of multi-criteria decision analysis in selecting of sustainable investments

    NASA Astrophysics Data System (ADS)

    Kozik, Renata

    2017-07-01

    Investors of construction projects, especially financed with public money, quite slowly adapt environmentally friendly solutions, e.g. passive buildings. Practice shows that the use of green public procurement among the public investors is negligible. Energy-saving technologies and equipment are expensive at the construction phase and investors less or not at all take into account the future operating costs. The aim of this article is to apply the method of multi-criteria analysis ELECTRE to select the best investment in terms of cost of implementation, operation, as well as the impact on the environment.

  4. Selected Readings in the History of Soviet Operational Art

    DTIC Science & Technology

    1990-05-01

    beginning of the twentieth century (the Russo- Japanese War); now massive armies, numbering millions and supplied with massive equipment, operate on...light, according to the experience of the wars of the twentieth century, a picture of political preparation and maintenance of war. The exposition...history of the most important wars of the twentieth century, the interrelationships of war and politics in the epoch and on the grounds of imperialism

  5. Legacy of Operational Space Medicine During the Space Shuttle Program

    NASA Technical Reports Server (NTRS)

    Stepaniakm, P.; Gilmore, S.; Johnston, S.; Chandler, M.; Beven, G.

    2011-01-01

    The Johnson Space Center s Medical Science Division branches were involved in preparing astronauts for space flight during the 30 year period of the Space Shuttle Program. These branches included the Flight Medicine Clinic, Medical Operations and the Behavioral Health Program. The components of each facet of these support services were: the Flight Medicine Clinic s medical selection process and medical care; the Medical Operations equipment, training, procedures and emergency medical services; and the Behavioral Health and Performance operations. Each presenter will discuss the evolution of its operations, implementations, lessons learned and recommendations for future vehicles and short duration space missions.

  6. Trace Contaminant Control During the International Space Station's On-Orbit Assembly and Outfitting

    NASA Technical Reports Server (NTRS)

    Perry, J. L.

    2017-01-01

    Achieving acceptable cabin air quality must balance competing elements during spacecraft design, assembly, ground processing, and flight operations. Among the elements that contribute to the trace chemical contaminant load and, therefore, the cabin air quality aboard crewed spacecraft are the vehicle configuration, crew size and activities, mission duration and objectives, materials selection, and vehicle manufacturing and preflight ground processing methods. Trace chemical contaminants produced from pervasive sources such as equipment offgassing, human metabolism, and cleaning fluids during preflight ground processing present challenges to maintaining acceptable cabin air quality. To address these challenges, both passive and active contamination control techniques are used during a spacecraft's design, manufacturing, preflight preparation, and operational phases. Passive contamination control methods seek to minimize the equipment offgassing load by selecting materials, manufacturing processes, preflight preparation processes, and in-flight operations that have low chemical offgassing characteristics. Passive methods can be employed across the spacecraft's entire life cycle from conceptual design through flight operations. However, because the passive contamination control techniques cannot fully eliminate the contaminant load, active contamination control equipment must be deployed aboard the spacecraft to purify and revitalize the cabin atmosphere during in-flight operations. Verifying that the passive contamination control techniques have successfully maintained the total trace contaminant load within the active contamination control equipment's capabilities occurs late in the preflight preparation stages. This verification consists of subjecting the spacecraft to an offgassing test to determine the trace contaminant load. This load is then assessed versus the active contamination control equipment's capabilities via trace contaminant control (TCC) engineering analysis. During the International Space Station's (ISS's) on-orbit assembly and outfitting, a series of engineering analyses were conducted to evaluate how effective the passive TCC methods were relative to providing adequate operational margin for the active TCC equipment's capabilities aboard the ISS. These analyses were based on habitable module and cargo vehicle offgassing test results. The offgassing test for a fully assembled module or cargo vehicle is an important preflight spacecraft evaluation method that has been used successfully during all crewed spacecraft programs to provide insight into how effectively the passive contamination control methods limit the equipment offgassing component of the overall trace contaminant generation load. The progression of TCC assessments beginning in 1998 with the ISS's first habitable element launch and continuing through the final pressurized element's arrival in 2010 are presented. Early cargo vehicle flight assessments between 2008 and 2011 are also presented as well as a discussion on predictive methods for assessing cargo via a purely analytical technique. The technical approach for TCC employed during this 13-year period successfully maintained the cabin atmospheric quality within specified parameters during the technically challenging ISS assembly and outfitting stages. The following narrative provides details on the important role of spacecraft offgassing testing, trace contaminant performance requirements, and flight rules for achieving the ultimate result-a cabin environment that enables people to live and work safely in space.

  7. 40 CFR 1054.230 - How do I select emission families?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... control for engine operation, other than governing (mechanical or electronic). (9) The numerical level of... POLLUTION CONTROLS CONTROL OF EMISSIONS FROM NEW, SMALL NONROAD SPARK-IGNITION ENGINES AND EQUIPMENT..., divide your product line into families of engines that are expected to have similar emission...

  8. 40 CFR 1054.230 - How do I select emission families?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... control for engine operation, other than governing (mechanical or electronic). (9) The numerical level of... POLLUTION CONTROLS CONTROL OF EMISSIONS FROM NEW, SMALL NONROAD SPARK-IGNITION ENGINES AND EQUIPMENT..., divide your product line into families of engines that are expected to have similar emission...

  9. 40 CFR 1054.230 - How do I select emission families?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... control for engine operation, other than governing (mechanical or electronic). (9) The numerical level of... POLLUTION CONTROLS CONTROL OF EMISSIONS FROM NEW, SMALL NONROAD SPARK-IGNITION ENGINES AND EQUIPMENT..., divide your product line into families of engines that are expected to have similar emission...

  10. 40 CFR 1054.230 - How do I select emission families?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... control for engine operation, other than governing (mechanical or electronic). (9) The numerical level of... POLLUTION CONTROLS CONTROL OF EMISSIONS FROM NEW, SMALL NONROAD SPARK-IGNITION ENGINES AND EQUIPMENT..., divide your product line into families of engines that are expected to have similar emission...

  11. Heat Transfer in the Bayer Process

    NASA Astrophysics Data System (ADS)

    Thomas, Daniel

    Heat transfer equipment represents a significant portion of Bayer process plant capital and operating costs. Heater operation and maintenance activities can also create potential hazard exposure. Very early flowsheets tended to rely on direct heat transfer, i.e. steam injection heating and flash cooling, and this still persists to some extent today. There has however been an ever increasing utilization of indirect heat exchange over the past 100 years. This has been driven by higher energy efficiency targets and enabled by improvements in heat transfer equipment. In more recent decades there has been a partial shift towards slurry heating and cooling instead of liquor heating and cooling. This paper presents an historical perspective, explores some heater selection scenarios, and looks at future challenges and opportunities.

  12. Operating The Central Process Systems At Glenn Research Center

    NASA Technical Reports Server (NTRS)

    Weiler, Carly P.

    2004-01-01

    As a research facility, the Glenn Research Center (GRC) trusts and expects all the systems, controlling their facilities to run properly and efficiently in order for their research and operations to occur proficiently and on time. While there are many systems necessary for the operations at GRC, one of those most vital systems is the Central Process Systems (CPS). The CPS controls operations used by GRC's wind tunnels, propulsion systems lab, engine components research lab, and compressor, turbine and combustor test cells. Used widely throughout the lab, it operates equipment such as exhausters, chillers, cooling towers, compressors, dehydrators, and other such equipment. Through parameters such as pressure, temperature, speed, flow, etc., it performs its primary operations on the major systems of Electrical Dispatch (ED), Central Air Dispatch (CAD), Central Air Equipment Building (CAEB), and Engine Research Building (ERB). In order for the CPS to continue its operations at Glenn, a new contract must be awarded. Consequently, one of my primary responsibilities was assisting the Source Evaluation Board (SEB) with the process of awarding the recertification contract of the CPS. The job of the SEB was to evaluate the proposals of the contract bidders and then to present their findings to the Source Selecting Official (SSO). Before the evaluations began, the Center Director established the level of the competition. For this contract, the competition was limited to those companies classified as a small, disadvantaged business. After an industry briefing that explained to qualified companies the CPS and type of work required, each of the interested companies then submitted proposals addressing three components: Mission Suitability, Cost, and Past Performance. These proposals were based off the Statement of Work (SOW) written by the SEB. After companies submitted their proposals, the SEB reviewed all three components and then presented their results to the SSO. While the SEB does not select the company receiving the contract, they can make recommendations based on their findings to the SSO, who actually awards the contract. The SEB began work for this contract in July 2003 by writing the SOW and the selection will tentatively occur July 30, 2004. Contract awarding will take place Aug. 15. Following the awarding, the winning company has a 30-day Phase-in Period beginning Sept. 1,2004 and full performance will begin October 1.

  13. Hydraulic jet pumping in a remote location

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tjondrodiputro, B.; Gaul, R.B.; Gower, G.H.

    1986-12-01

    Hydraulic jet pumping equipment was installed in six Sembakung field (N.E. Kalimantan) wells by Atlantic Richfield Indonesia Inc., for Pertamina during 1983, and this article presents the experience acquired in the process of installing and operating this type of artificial-lift equipment in a remote location. Characteristics of the wells and equipment are reviewed, and possible future installations in similar circumstances are discussed. Sembakung oil field, discovered in late 1975, contained 17 wells after complete development. By 1983, some were flowing weakly and several zones were dead, indicating the need for some form of artificial lift. The choice of artificial liftmore » methods was limited by the lack of gas-lift gas, absence of a field-wide power distribution system, unavailability of a rod pumping well servicing unit, and lack of roads in the marshy environment. Thus, hydraulic (free-type) jet pumping was selected as the optimum technique. Jet pumps were installed in six of 17 wells in the field at the end of 1983. Downhole equipment was installed using a heli-rig, and all surface equipment was delivered to location using helicopters. Since startup, some operating problems occurred, but they have all been resolved. Well pumping rates range from 340 to 650 bpd gross, with 0 to 50% BSandW. The jet-pumped wells produced satisfactorily through July 1984, at which time operations were turned over to Pertamina Unit IV at the conclusion of the contractual term.« less

  14. 77 FR 497 - Control of Emissions From New Nonroad Compression-Ignition Engines: Approval of New Scheduled...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-05

    ... replenishment of the nitrogen-containing reducing agent for selective catalytic reduction (SCR) technologies... NO X reduction requirements for their diesel engines. SCR systems use a nitrogen-containing reducing... balance between the dictates of operating nonroad equipment (which requires DEF tanks of small enough...

  15. Computer Aided Reference Services in the Academic Library: Experiences in Organizing and Operating an Online Reference Service.

    ERIC Educational Resources Information Center

    Hoover, Ryan E.

    1979-01-01

    Summarizes the development of the Computer-Aided Reference Services (CARS) division of the University of Utah Libraries' reference department. Development, organizational structure, site selection, equipment, management, staffing and training considerations, promotion and marketing, budget and pricing, record keeping, statistics, and evaluation…

  16. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Piekarski, D.; Brad, D.

    This report is about a work effort where the overall objectives were to establish a methodology and approach for selected transmission and distribution (T&D) grid modernization; monitor the results; and report on the findings, recommendations, and lessons learned. The work reported addressed T&D problems and solutions, related reliability issues, equipment and operation upgrades, and respective field testing.

  17. 30 CFR 250.1623 - Well-control fluids, equipment, and operations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Well-control fluids, equipment, and operations... OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Sulphur Operations § 250.1623 Well-control fluids, equipment, and operations. (a) Well-control fluids, equipment, and operations...

  18. Sample selection and testing of separation processes

    NASA Technical Reports Server (NTRS)

    Karr, L. J.

    1985-01-01

    Phase partitioning, which has become an important tool for the separation and purification of biological materials, was studied. Instruments available for this technique were researched and a countercurrent distribution apparatus, the Biosheff MK2N, was purchased. Various proteins, polysaccharides and cells were studied as models to determine operating procedures and conditions for this piece of equipment. Results were compared with those obtained from other similar equipment, including a nonsynchronous coil planet centrifuge device. Additionally, work was done with affinity ligands attached to PEG, which can further enhance the separation capabilities of phase partitioning.

  19. Preliminary design study of underground pumped hydro and compressed-air energy storage in hard rock. Volume 8: Design approaches: UPH. Appendix C: Heavy hoist

    NASA Astrophysics Data System (ADS)

    1981-04-01

    Overriding considerations, including type of hoist, capacity limitations, operating speed, haulage ropes, guides, conveyance, and landings were studied within the context both of feasibility and of minimizing equipment costs. The study led to the selection of a twin drum, twin electric drive hoist, and for depths as much as 5000 ft, hoist capacities of up to 300 tons were found to be feasible. A brief reference is made to the requirements for hoisting equipment other than for heavy loads.

  20. Equipment upgrades for the Pu-238 program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Congdon, J.W.; Stephens, W.D.; Marra, J.E.

    1990-02-14

    Much of the equipment and instrumentation in the Pu-238 production facilities is more than 15 years old. Significant improvements have been made in the available instrumentation, in particular, due to the application of microprocessors and lasers. The Actinide Technology Section of SRL has selected and is in the process of evaluating several state-of-the-art instruments which have potential applications in the Pu-238 program. The ease of operation and the accuracy of the instruments have been improved and, in most cases, the cost of the instruments have decreased. 5 refs.

  1. 30 CFR 75.1916 - Operation of diesel-powered equipment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Operation of diesel-powered equipment. 75.1916... SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Diesel-Powered Equipment § 75.1916 Operation of diesel-powered equipment. (a) Diesel-powered equipment shall be operated at a speed that is...

  2. 30 CFR 75.1916 - Operation of diesel-powered equipment.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Operation of diesel-powered equipment. 75.1916... SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Diesel-Powered Equipment § 75.1916 Operation of diesel-powered equipment. (a) Diesel-powered equipment shall be operated at a speed that is...

  3. 47 CFR 80.225 - Requirements for selective calling equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... selective calling (DSC) equipment and selective calling equipment installed in ship and coast stations, and...-STD, “RTCM Recommended Minimum Standards for Digital Selective Calling (DSC) Equipment Providing... Class ‘D’ Digital Selective Calling (DSC)—Methods of testing and required test results,” March 2003. ITU...

  4. Electrical termination techniques

    NASA Technical Reports Server (NTRS)

    Oakey, W. E.; Schleicher, R. R.

    1976-01-01

    A technical review of high reliability electrical terminations for electronic equipment was made. Seven techniques were selected from this review for further investigation, experimental work, and preliminary testing. From the preliminary test results, four techniques were selected for final testing and evaluation. These four were: (1) induction soldering, (2) wire wrap, (3) percussive arc welding, and (4) resistance welding. Of these four, induction soldering was selected as the best technique in terms of minimizing operator errors, controlling temperature and time, minimizing joint contamination, and ultimately producing a reliable, uniform, and reusable electrical termination.

  5. Design and operation of a solar heating and cooling system for a residential size building

    NASA Technical Reports Server (NTRS)

    Littles, J. W.; Humphries, W. R.; Cody, J. C.

    1978-01-01

    The first year of operation of solar house is discussed. Selected design information, together with a brief system description is included. The house was equipped with an integrated solar heating and cooling system which uses fully automated state-of-the art. Evaluation of the data indicate that the solar house heating and cooling system is capable of supplying nearly 100 percent of the thermal energy required for heating and approximately 50 percent of the thermal energy required to operate the absorption cycle air conditioner.

  6. Cost containment and KSC Shuttle facilities or cost containment and aerospace construction

    NASA Technical Reports Server (NTRS)

    Brown, J. A.

    1985-01-01

    This presentation has the objective to show examples of Cost Containment of Aerospace Construction at Kennedy Space Center (KSC), taking into account four major levels of Project Development of the Space Shuttle Facilities. The levels are related to conceptual criteria and site selection, the design of construction and ground support equipment, the construction of facilities and ground support equipment (GSE), and operation and maintenance. Examples of cost containment are discussed. The continued reduction of processing time from landing to launching represents a demonstration of the success of the cost containment methods. Attention is given to the factors which led to the selection of KSC, the use of Cost Engineering, the employment of the Construction Management Concept, and the use of Computer Aided Design/Drafting.

  7. DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    This report is concerned with the nature and scope of the technical services to be rendered and the general plan proposed for operation of Building 3525, High Radiation Level Examination Laboratory (HRLEL). The role of postirradiation examination in implementing the over- all task of irradiation testing for various programs under way at the Oak Ridge National Laboratory (ORNL) and the importance of this effort to the United Stat es reactor development program are stressed . The shielded-cell complex with provisions for remote decontamination, hot-equipment storage, and maintenance is described, as well as other supporting activities which are incorporated into themore » facility. The proposed technical functions include general observation, mensuration, nondestructive testing, burnup and induced-activity measurements, fission-gas sampling and analysis, corrosion evaluation and related measurements, disassembly and cutup, metallographic examination, mechanical-property determinations , and x -ray diffraction analyses. Equipment design and operational features to improve detection and measurement of selected properties in radioactive material s are described, also. The current status on design, procurement, construction, and preoperational testing of in- cell equipment in the mockup is presented along with a forecast of future needs. The mode of operation, manpower requirements, and management of the facility are discussed.« less

  8. Fluid technology (selected components, devices, and systems): A compilation

    NASA Technical Reports Server (NTRS)

    1974-01-01

    Developments in fluid technology and hydraulic equipment are presented. The subjects considered are: (1) the use of fluids in the operation of switches, amplifiers, and servo devices, (2) devices and data for laboratory use in the study of fluid dynamics, and (3) the use of fluids as controls and certain methods of controlling fluids.

  9. Flammability, Offgassing, and Compatibility Requirements and Test Procedures. Interim NASA Technical Standard

    NASA Technical Reports Server (NTRS)

    2009-01-01

    This Interim Standard establishes requirements for evaluation, testing, and selection of materials that are intended for use in space vehicles, associated Ground Support Equipment (GSE), and facilities used during assembly, test, and flight operations. Included are requirements, criteria, and test methods for evaluating the flammability, offgassing, and compatibility of materials.

  10. Design study of general aviation collision avoidance system

    NASA Technical Reports Server (NTRS)

    Bates, M. R.; Moore, L. D.; Scott, W. V.

    1972-01-01

    The selection and design of a time/frequency collision avoidance system for use in general aviation aircraft is discussed. The modifications to airline transport collision avoidance equipment which were made to produce the simpler general aviation system are described. The threat determination capabilities and operating principles of the general aviation system are illustrated.

  11. Selection and Application of Liquid and Semi-Solid Lubricants in Aerospace Vehicles and Supporting Equipment

    DTIC Science & Technology

    1965-10-01

    lubrication method even though the Correct lubricant and method of xubrioation were readily available with a long history of successful operation under...grease has failed. During the discussion of the lubricant failure it is disclosed that the failure is due to corrosion of titani ™ *etal located

  12. Prevalence of Visible and Occult Blood on Airway Management Equipment Used Outside the Operating Room

    DTIC Science & Technology

    1999-10-01

    Literature In Nursing Theories and Their Work (1993), deGraff, Marriner-Tomey, Mossman, and Slebodnik presented an historical overview of the matriarch ...R.B. (1973). Cleaning the laryngoscope blade. Canadian Anaesthesia Society Journal, 20(2), 241-244. Rutala, W.A. (1996). APIC guideline for selection

  13. 14 CFR 125.209 - Emergency equipment: Extended overwater operations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Emergency equipment: Extended overwater... Equipment Requirements § 125.209 Emergency equipment: Extended overwater operations. (a) No person may operate an airplane in extended overwater operations unless it carries, installed in conspicuously marked...

  14. 14 CFR 125.209 - Emergency equipment: Extended overwater operations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Emergency equipment: Extended overwater... Equipment Requirements § 125.209 Emergency equipment: Extended overwater operations. (a) No person may operate an airplane in extended overwater operations unless it carries, installed in conspicuously marked...

  15. 14 CFR 125.209 - Emergency equipment: Extended overwater operations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Emergency equipment: Extended overwater... Equipment Requirements § 125.209 Emergency equipment: Extended overwater operations. (a) No person may operate an airplane in extended overwater operations unless it carries, installed in conspicuously marked...

  16. 14 CFR 125.209 - Emergency equipment: Extended overwater operations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Emergency equipment: Extended overwater... Equipment Requirements § 125.209 Emergency equipment: Extended overwater operations. (a) No person may operate an airplane in extended overwater operations unless it carries, installed in conspicuously marked...

  17. 14 CFR 125.209 - Emergency equipment: Extended overwater operations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Emergency equipment: Extended overwater... Equipment Requirements § 125.209 Emergency equipment: Extended overwater operations. (a) No person may operate an airplane in extended overwater operations unless it carries, installed in conspicuously marked...

  18. 29 CFR 1926.605 - Marine operations and equipment.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 8 2011-07-01 2011-07-01 false Marine operations and equipment. 1926.605 Section 1926.605 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION... Equipment, and Marine Operations § 1926.605 Marine operations and equipment. (a) Material handling...

  19. 29 CFR 1926.605 - Marine operations and equipment.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 8 2014-07-01 2014-07-01 false Marine operations and equipment. 1926.605 Section 1926.605 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION... Equipment, and Marine Operations § 1926.605 Marine operations and equipment. (a) Material handling...

  20. 29 CFR 1926.605 - Marine operations and equipment.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 8 2012-07-01 2012-07-01 false Marine operations and equipment. 1926.605 Section 1926.605 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION... Equipment, and Marine Operations § 1926.605 Marine operations and equipment. (a) Material handling...

  1. 29 CFR 1926.605 - Marine operations and equipment.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 8 2013-07-01 2013-07-01 false Marine operations and equipment. 1926.605 Section 1926.605 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION... Equipment, and Marine Operations § 1926.605 Marine operations and equipment. (a) Material handling...

  2. Reducing Sweeping Frequencies in Microwave NDT Employing Machine Learning Feature Selection

    PubMed Central

    Moomen, Abdelniser; Ali, Abdulbaset; Ramahi, Omar M.

    2016-01-01

    Nondestructive Testing (NDT) assessment of materials’ health condition is useful for classifying healthy from unhealthy structures or detecting flaws in metallic or dielectric structures. Performing structural health testing for coated/uncoated metallic or dielectric materials with the same testing equipment requires a testing method that can work on metallics and dielectrics such as microwave testing. Reducing complexity and expenses associated with current diagnostic practices of microwave NDT of structural health requires an effective and intelligent approach based on feature selection and classification techniques of machine learning. Current microwave NDT methods in general based on measuring variation in the S-matrix over the entire operating frequency ranges of the sensors. For instance, assessing the health of metallic structures using a microwave sensor depends on the reflection or/and transmission coefficient measurements as a function of the sweeping frequencies of the operating band. The aim of this work is reducing sweeping frequencies using machine learning feature selection techniques. By treating sweeping frequencies as features, the number of top important features can be identified, then only the most influential features (frequencies) are considered when building the microwave NDT equipment. The proposed method of reducing sweeping frequencies was validated experimentally using a waveguide sensor and a metallic plate with different cracks. Among the investigated feature selection techniques are information gain, gain ratio, relief, chi-squared. The effectiveness of the selected features were validated through performance evaluations of various classification models; namely, Nearest Neighbor, Neural Networks, Random Forest, and Support Vector Machine. Results showed good crack classification accuracy rates after employing feature selection algorithms. PMID:27104533

  3. Highway Maintenance Equipment Operator. Miscellaneous Equipment. Training Materials.

    ERIC Educational Resources Information Center

    Perky, Sandra Dutreau; And Others

    This curriculum guide provides instructional materials to assist in training equipment operators in the safe and effective use of highway maintenance equipment. It includes six units of instruction covering the small, specialized equipment used in maintenance operations. Each unit of instruction consists of eight basic components: performance…

  4. Lung cancer in heavy equipment operators and truck drivers with diesel exhaust exposure in the construction industry.

    PubMed

    Järvholm, B; Silverman, D

    2003-07-01

    Several studies indicate that truck drivers have an increased risk of lung cancer, but few studies have examined lung cancer risk in heavy equipment operators. Workers in both occupations are exposed to diesel exhaust. To examine the incidence and mortality from lung cancer among truck drivers and among drivers of heavy vehicles. A computerised register of Swedish construction workers participating in health examinations between 1971 and 1992 was used. Male truck drivers (n = 6364) and drivers of heavy construction vehicles (n = 14 364) were selected as index groups; carpenters/electricians constituted the reference group (n = 119 984). Operators of heavy construction equipment experienced no increased risk of lung cancer compared to risk among the carpenter/electrician referents (61 cases v 70.1 expected). However, a significant inverse trend risk with increasing use of cabins was apparent. Truck drivers had increased risks of cancer of the lung (61 cases v 47.3 expected) and prostate (124 cases v 99.7 expected), although only mortality for lung cancer was significantly increased. Comparisons with the general population showed similar results. Results are consistent with those of previous studies suggesting that heavy equipment operators with potential exposure to diesel exhaust may have little or no increased risk of lung cancer, although the use of cabins seemed to decrease the risk of lung cancer. The results for truck drivers are also consistent with previous reports of increased lung cancer risk among truck drivers exposed to diesel exhaust, as well as recent reports linking diesel exhaust exposure to prostate cancer.

  5. 49 CFR 236.6 - Hand-operated switch equipped with switch circuit controller.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Hand-operated switch equipped with switch circuit..., AND APPLIANCES Rules and Instructions: All Systems General § 236.6 Hand-operated switch equipped with switch circuit controller. Hand-operated switch equipped with switch circuit controller connected to the...

  6. 49 CFR 236.6 - Hand-operated switch equipped with switch circuit controller.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Hand-operated switch equipped with switch circuit..., AND APPLIANCES Rules and Instructions: All Systems General § 236.6 Hand-operated switch equipped with switch circuit controller. Hand-operated switch equipped with switch circuit controller connected to the...

  7. 49 CFR 236.6 - Hand-operated switch equipped with switch circuit controller.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Hand-operated switch equipped with switch circuit..., AND APPLIANCES Rules and Instructions: All Systems General § 236.6 Hand-operated switch equipped with switch circuit controller. Hand-operated switch equipped with switch circuit controller connected to the...

  8. 49 CFR 236.6 - Hand-operated switch equipped with switch circuit controller.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Hand-operated switch equipped with switch circuit..., AND APPLIANCES Rules and Instructions: All Systems General § 236.6 Hand-operated switch equipped with switch circuit controller. Hand-operated switch equipped with switch circuit controller connected to the...

  9. 49 CFR 236.6 - Hand-operated switch equipped with switch circuit controller.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Hand-operated switch equipped with switch circuit..., AND APPLIANCES Rules and Instructions: All Systems General § 236.6 Hand-operated switch equipped with switch circuit controller. Hand-operated switch equipped with switch circuit controller connected to the...

  10. Highway Maintenance Equipment Operator. Specialized Equipment. Training Materials.

    ERIC Educational Resources Information Center

    Perky, Sandra Dutreau; And Others

    This curriculum guide provides instructional materials to assist in training equipment operators in the safe and effective use of highway maintenance equipment. It includes 18 units of instruction covering the large equipment used in maintenance operations. Each unit of instruction consists of eight basic components: performance objectives,…

  11. Space Shuttle crew compartment debris-contamination

    NASA Technical Reports Server (NTRS)

    Goodman, Jerry R.; Villarreal, Leopoldo J.

    1992-01-01

    Remedial actions undertaken to reduce debris during manned flights and ground turnaround operations at Kennedy Space Center and Palmdale are addressed. They include redesign of selected ground support equipment and Orbiter hardware to reduce particularization/debris generation; development of new detachable filters for air-cooled avionics boxes; application of tape-on screens to filter debris; and implementation of new Orbiter maintenance and turnaround procedures to clean filters and the crew compartment. Most of these steps were implemented before the return-to-flight of STS-26 in September 1988 which resulted in improved crew compartment habitability and less potential for equipment malfunction.

  12. Automatic Inspection In Car Industry : User Point-Of-View

    NASA Astrophysics Data System (ADS)

    Salesse, Robert

    1986-11-01

    Many equipments for automatic inspection with vision have been incorporated in production lines of nearly all car manufacturers. RENAULT also has now a three years of experience with automated vision and some rules have been established. Our most important contributions have been : - Examples of applications, some now operating, some waiting for integration in complete systems. - How to establish a good "request to quote" ? - How to examine and compare suppliers'offers ? What selection criterias and important questions to ask for ? - What can be expected from the new vision equipment and what are the needs in hardware and software.

  13. Evaluating Moisture Control of Variable-Capacity Heat Pumps in Mechanically Ventilated, Low-Load Homes in Climate Zone 2A

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Martin, Eric; Withers, Chuck; McIlvaine, Janet

    The well-sealed, highly insulated building enclosures constructed by today's home building industry coupled with efficient lighting and appliances are achieving significantly reduced heating and cooling loads. These low-load homes can present a challenge when selecting appropriate space-conditioning equipment. Conventional, fixed-capacity heating and cooling equipment is often oversized for small homes, causing increased first costs and operating costs. Even if fixed-capacity equipment can be properly specified for peak loads, it remains oversized for use during much of the year. During these part-load cooling hours, oversized equipment meets the target dry-bulb temperatures very quickly, often without sufficient opportunity for moisture control. Themore » problem becomes more acute for high-performance houses in humid climates when meeting ASHRAE Standard 62.2 recommendations for wholehouse mechanical ventilation.« less

  14. Inland Waterway Environmental Safety

    NASA Astrophysics Data System (ADS)

    Reshnyak, Valery; Sokolov, Sergey; Nyrkov, Anatoliy; Budnik, Vlad

    2018-05-01

    The article presents the results of development of the main components of the environmental safety when operating vessels on inland waterways, which include strategy selection ensuring the environmental safety of vessels, the selection and justification of a complex of environmental technical means, activities to ensure operation of vessels taking into account the environmental technical means. Measures to ensure environmental safety are developed on the basis of the principles aimed at ensuring environmental safety of vessels. They include the development of strategies for the use of environmental protection equipment, which are determined by the conditions for wastewater treatment of purified sewage and oily bilge water as well as technical characteristics of the vessels, the introduction of the process of the out-of-the-vessel processing of ship pollution as a technology for their movement. This must take into account the operating conditions of vessels on different sections of waterways. An algorithm of actions aimed at ensuring ecological safety of operated vessels is proposed.

  15. Independent Orbiter Assessment (IOA): Analysis of the instrumentation subsystem

    NASA Technical Reports Server (NTRS)

    Howard, B. S.

    1986-01-01

    The results of the Independent Orbiter Assessment (IOA) of the Failure Modes and Effects Analysis (FMEA) and Critical Items List (CIL) are presented. The IOA approach features a top-down analysis of the hardware to determine failure modes, criticality, and potential critical items. To preserve independence, this analysis was accomplished without reliance upon the results contained within the NASA FMEA/CIL documentation. The independent analysis results for the Instrumentation Subsystem are documented. The Instrumentation Subsystem (SS) consists of transducers, signal conditioning equipment, pulse code modulation (PCM) encoding equipment, tape recorders, frequency division multiplexers, and timing equipment. For this analysis, the SS is broken into two major groupings: Operational Instrumentation (OI) equipment and Modular Auxiliary Data System (MADS) equipment. The OI equipment is required to acquire, condition, scale, digitize, interleave/multiplex, format, and distribute operational Orbiter and payload data and voice for display, recording, telemetry, and checkout. It also must provide accurate timing for time critical functions for crew and payload specialist use. The MADS provides additional instrumentation to measure and record selected pressure, temperature, strain, vibration, and event data for post-flight playback and analysis. MADS data is used to assess vehicle responses to the flight environment and to permit correlation of such data from flight to flight. The IOA analysis utilized available SS hardware drawings and schematics for identifying hardware assemblies and components and their interfaces. Criticality for each item was assigned on the basis of the worst-case effect of the failure modes identified.

  16. EGU2013 SM1.4/GI1.6 session: "Improving seismic networks performances: from site selection to data integration"

    NASA Astrophysics Data System (ADS)

    Pesaresi, D.; Busby, R.

    2013-08-01

    The number and quality of seismic stations and networks in Europe continually improves, nevertheless there is always scope to optimize their performance. In this session we welcomed contributions from all aspects of seismic network installation, operation and management. This includes site selection; equipment testing and installation; planning and implementing communication paths; policies for redundancy in data acquisition, processing and archiving; and integration of different datasets including GPS and OBS.

  17. The state-of-the-art of cryogenic thermometry and signal conditioners and their potential for standardized space hardware

    NASA Technical Reports Server (NTRS)

    1983-01-01

    The possibility of standard low temperature detector(s) for use in upcoming cryogenically cooled satellite and Space Shuttle payloads were investigated. These payloads operate from .3 kelvin to 300 kelvin. Standard detectors were selected and matching signal conditioning equipment compatible with the selected detector, typical spacecraft voltages, typical spacecraft telemetry systems, and the radiation encountered by a typical Earth orbiting spacecraft. Work statements to better define and advance detector performance were presented.

  18. Air Force Operational Medicine: Using the Enterprise Estimating Supplies Program to Develop Materiel Solutions for the Operational Requirements of the Air Force Ophthalmology Augmentation Team (FFEYE)

    DTIC Science & Technology

    2010-10-14

    non-battle injuries , and illnesses. International Classification of Diseases, Ninth Revision (ICD-9) coded patient conditions, selected by the...for a range of surgical and non- surgical injuries and illnesses, typically seen and treated by an ophthalmologist and one technician working 12-hour...receive them. The “Equipment/supplies” column identifies the items needed to complete the “Insert endo - trach tube” task at that level of capability. Not

  19. Moral and Ethical Dilemmas in Canadian Forces Military Operation: Qualitative and Descriptive Analyses of Commanders’ Operational Experiences

    DTIC Science & Technology

    2008-10-01

    aussi remarqué une proportion légèrement plus élevée de comptes rendus irrésolus qui mentionnaient l’honneur et la fierté personnels, comparativement ...military commanders during overseas missions. Note that the original interview protocol was semi-structured and designed to allow the interviewee to...should be selected so that no security classification is required. Identifiers, such as equipment model designation , trade name, military project code

  20. 76 FR 41859 - Waiver Petition Docket Numbers FRA-2011-0002, CSX Transportation Railroad, and FRA-2004-17565...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-15

    ... FR 10087) announcing the CSX Transportation Railroad's (CSXT) request for a waiver to operate RailRunner equipment in RailRunner only operations; operate RailRunner equipment commingled with RoadRailer bi-modal equipment; and RailRunner equipment operating behind various conventional railcars. On...

  1. Development and Exchange of Instructional Resources in Water Quality Control Programs, III: Selecting Audio-Visual Equipment.

    ERIC Educational Resources Information Center

    Moon, Donald K.

    This document is one in a series of reports which reviews instructional materials and equipment and offers suggestions about how to select equipment. Topics discussed include: (1) the general criteria for audio-visual equipment selection such as performance, safety, comparability, sturdiness and repairability; and (2) specific equipment criteria…

  2. The IHS diagnostic X-ray equipment radiation protection program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Knapp, A.; Byrns, G.; Suleiman, O.

    The Indian Health Service (IHS) operates or contracts with Tribal groups to operate 50 hospitals and approximately 165 primary ambulatory care centers. These facilities contain approximately 275 medical and 800 dental diagnostic x-ray machines. IHS environmental health personnel in collaboration with the Food and Drug Administration's (FDA) Center for Devices and Radiological Health (CDRH) developed a diagnostic x-ray protection program including standard survey procedures and menu-driven calculations software. Important features of the program include the evaluation of equipment performance collection of average patient entrance skin exposure (ESE) measurements for selected procedures, and quality assurance. The ESE data, collected using themore » National Evaluation of X-ray Trends (NEXT) protocol, will be presented. The IHS Diagnostic X-ray Radiation Protection Program is dynamic and is adapting to changes in technology and workload.« less

  3. Flight Computer Processing Avionics for Space Station Microgravity Experiments: A Risk Assessment of Commercial Off-the-Shelf Utilization

    NASA Technical Reports Server (NTRS)

    Estes, Howard; Liggin, Karl; Crawford, Kevin; Humphries, Rick (Technical Monitor)

    2001-01-01

    NASA/Marshall Space Flight Center (MSFC) is continually looking for ways to reduce the costs and schedule and minimize the technical risks during the development of microgravity programs. One of the more prominent ways to minimize the cost and schedule is to use off-the-shelf hardware (OTS). However, the use of OTS often increases the risk. This paper addresses relevant factors considered during the selection and utilization of commercial off-the-shelf (COTS) flight computer processing equipment for the control of space station microgravity experiments. The paper will also discuss how to minimize the technical risks when using COTS processing hardware. Two microgravity experiments for which the COTS processing equipment is being evaluated for are the Equiaxed Dendritic Solidification Experiment (EDSE) and the Self-diffusion in Liquid Elements (SDLE) experiment. Since MSFC is the lead center for Microgravity research, EDSE and SDLE processor selection will be closely watched by other experiments that are being designed to meet payload carrier requirements. This includes the payload carriers planned for the International Space Station (ISS). The purpose of EDSE is to continue to investigate microstructural evolution of, and thermal interactions between multiple dendrites growing under diffusion controlled conditions. The purpose of SDLE is to determine accurate self-diffusivity data as a function of temperature for liquid elements selected as representative of class-like structures. In 1999 MSFC initiated a Center Director's Discretionary Fund (CDDF) effort to investigate and determine the optimal commercial data bus architecture that could lead to faster, better, and lower cost data acquisition systems for the control of microgravity experiments. As part of this effort various commercial data acquisition systems were acquired and evaluated. This included equipment with various form factors, (3U, 6U, others) and equipment that utilized various bus structures, (VME, PC104, STD bus). This evaluation of hardware was performed in conjunction with a trade study that considered over twenty (20) different factors relevant to the selection of an optimum design approach. These factors included; safety, sizing and timing, radiation hardness and single event upset, power consumption, heat dissipation, size and volume, expected service life, maintainability, heritage, operating systems, requirements for software reuse, availability of compatible interface boards, relative cost, schedule, reliability, EMI/EMC factors, "hot swap" capability, standards for conduction cooling, I/O capabilities, unique carrier requirements and operating system considerations. The approach to evaluate Safety as part of this study included a review of the Preliminary Hazard Analysis (PHA) for each of the experiment designs and a determination of how each hazard could be addressed and eliminated when different processors were selected. This included evaluating various design approaches and trade-offs between fault tolerant designs and fail-safe designs in accordance with NSTS 1700.7B. This will include the results of radiation testing where available. Various operating systems, such as VxWorks, Linux, QNX, and Embedded NT are evaluated and the advantages and disadvantages of their utilization are also addressed. Design implementation strategies for the various operating systems are considered and discussed. This paper presents the results and recommendations from this trade study. Preliminary conclusions from this study are that safety concerns from lack or radiation testing on COTS equipment can be addressed by additional testing and design considerations, the PC104 bus provided adequate I/O for the SDLE and EDSE microgravity experiments, and PC104 bus components offered significant advantages over VME and cPCI for weight and space reductions.

  4. INSTRUCTION IN FARM MECHANICS, SUGGESTIONS FOR DEVELOPING TRAINING PROGRAMS IN FARM MECHANICS IN VOCATIONAL AGRICULTURE.

    ERIC Educational Resources Information Center

    HOLLENBERG, A.H.; JOHNSON, E.J.

    THE PURPOSE OF THE PROGRAM GUIDE IS TO ASSIST TEACHERS IN TRAINING YOUNG FARMERS AND FARM WORKERS IN THE SELECTION, OPERATION, UTILIZATION, AND MAINTENANCE OF FARM TOOLS, MACHINERY, AND MECHANICAL EQUIPMENT. DESIGNED BY NATIONAL AGRICULTURAL EDUCATION SPECIALISTS, THE DOCUMENT INCLUDES CHAPTERS ON THE CHANGING FARM, SETTING UP PROGRAMS, FARM…

  5. Development of regional stump-to-mill logging cost estimators

    Treesearch

    Chris B. LeDoux; John E. Baumgras

    1989-01-01

    Planning logging operations requires estimating the logging costs for the sale or tract being harvested. Decisions need to be made on equipment selection and its application to terrain. In this paper a methodology is described that has been developed and implemented to solve the problem of accurately estimating logging costs by region. The methodology blends field time...

  6. Development and Validation of a Computer Interactive Test Battery.

    ERIC Educational Resources Information Center

    Sheppard, Valarie A.; Baker, Todd A.; Gebhardt, Deborah L.; Leonard, Kristine M.

    The purpose of this project was to develop valid evaluation procedures for the selection of Container Equipment Operators (CEOs) in the shipping industry. A job analysis was conducted to identify the essential tasks of the CEO job. Site visits, a task inventory, and the determination of essential tasks were used in the job analysis. The skills and…

  7. Careers in Industrial Sewing for the Apparel Manufacturing Industry: Teacher-Student Guide.

    ERIC Educational Resources Information Center

    American Apparel Manufacturers Association, Arlington, VA. Education Committee.

    The teacher-student guide has been developed as a service to schools in an effort to help them organize and operate meaningful courses in apparel manufacturing. For the school it furnishes practical information in implementing the course, such as facility design, equipment requirements, and teacher selection. For the teacher it provides a…

  8. 49 CFR Appendix A to Part 236 - Civil Penalties 1

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... electro-magnetic, electronic, or electrical apparatus 1,000 2,000 236.9Selection of circuits through....4Interference with normal functioning of device 5,000 7,500 236.5Design of control circuits on closed circuit principle 1,000 2,000 236.6Hand-operated switch equipped with switch circuit controller 1,000 2,000 236...

  9. 49 CFR Appendix A to Part 236 - Civil Penalties 1

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... electro-magnetic, electronic, or electrical apparatus 1,000 2,000 236.9Selection of circuits through....4Interference with normal functioning of device 5,000 7,500 236.5Design of control circuits on closed circuit principle 1,000 2,000 236.6Hand-operated switch equipped with switch circuit controller 1,000 2,000 236...

  10. Development of an iron nitrate resistant injector valve for the Space Shuttle orbiter primary thruster

    NASA Technical Reports Server (NTRS)

    Wichmann, Horst; Marquardt, Kaiser; Goforth, Alyssa

    1993-01-01

    Design of a direct-acting valve (DAV) for a primary thruster which is fully interchangeable with a thruster equipped with pilot-operated valves is described. The DAV is based on a bellows to isolate propellants form the actuator for maximum resistance to iron nitrate and other contamination and to select optimum materials for the actuator. It provides improved seal performance under all operating conditions and insensitivity to pressure transients. As compared with the existing pilot-operated valve, the DAV design is much simpler, consists of fewer parts, and will be lower in cost.

  11. ALSEP termination report

    NASA Technical Reports Server (NTRS)

    Bates, J. R.; Lauderdale, W. W.; Kernaghan, H.

    1979-01-01

    The Apollo Lunar Surface Experiments Package (ALSEP) final report was prepared when support operations were terminated September 30, 1977, and NASA discontinued the receiving and processing of scientific data transmitted from equipment deployed on the lunar surface. The ALSEP experiments (Apollo 11 to Apollo 17) are described and pertinent operational history is given for each experiment. The ALSEP data processing and distribution are described together with an extensive discussion on archiving. Engineering closeout tests and results are given, and the status and configuration of the experiments at termination are documented. Significant science findings are summarized by selected investigators. Significant operational data and recommendations are also included.

  12. Spacelab mission development tests

    NASA Technical Reports Server (NTRS)

    Dalton, B. P.

    1978-01-01

    The paper describes Spacelab Mission Development Test III (SMD III) whose principal scientific objective was to demonstrate the feasibility of conducting biological research in the Life Sciences Spacelab. The test also provided an opportunity to try out several items of Common Operational Research Equipment (CORE) hardware being developed for operational use in Shuttle/Spacelab, such as rodent and primate handling, transportation units, and a 'zero-g' surgical bench. Operational concepts planned for Spacelab were subjected to evaluation, including animal handling procedures, animal logistics, crew selection and training, and a 'remote' ground station concept. It is noted that all the objectives originally proposed for SMD III were accomplished

  13. Tracking and data relay satellite system configuration and tradeoff study. Volume 4: TDRS system operation and control and telecommunications service system, part 1

    NASA Technical Reports Server (NTRS)

    1972-01-01

    Major study areas treated in this volume are: 1) operations and control and 2) the telecommunication service system. The TDRS orbit selection, orbital deployment, ground station visibility, sequence of events from launch to final orbit position, and TDRS control center functions required for stationkeeping, repositioning, attitude control, and antenna pointing are briefly treated as part of the operations and control section. The last topic of this section concerns the operations required for efficiently providing the TDRSS user telecommunication services. The discussion treats functions of the GSFC control and data processing facility, ground station, and TDRS control center. The second major portion of this volume deals with the Telecommunication Service System (TSS) which consists of the ground station, TDRS communication equipment and the user transceiver. A summary of the requirements and objectives for the telecommunication services and a brief summary of the TSS capabilities is followed by communication system analysis, signal design, and equipment design. Finally, descriptions of the three TSS elements are presented.

  14. Lessons learned: design, start-up, and operation of cryogenic systems

    NASA Astrophysics Data System (ADS)

    Bell, W. M.; Bagley, R. E.; Motew, S.; Young, P.-W.

    2014-11-01

    Cryogenic systems involving a pumped cryogenic fluid, such as liquid nitrogen (LN2), require careful design since the cryogen is close to its boiling point and cold. At 1 atmosphere, LN2 boils at 77.4 K (-320.4 F). These systems, typically, are designed to transport the cryogen, use it for process heat removal, or for generation of gas (GN2) for process use. As the design progresses, it is important to consider all aspects of the design including, cryogen storage, pressure control and safety relief systems, thermodynamic conditions, equipment and instrument selection, materials, insulation, cooldown, pump start-up, maximum design and minimum flow rates, two phase flow conditions, heat flow, process control to meet and maintain operating conditions, piping integrity, piping loads on served equipment, warm-up, venting, and shut-down. "Cutting corners" in the design process can result in stalled start-ups, field rework, schedule hits, or operational restrictions. Some of these "lessoned learned" are described in this paper.

  15. Optimization of the operating conditions of gas-turbine power stations considering the effect of equipment deterioration

    NASA Astrophysics Data System (ADS)

    Aminov, R. Z.; Kozhevnikov, A. I.

    2017-10-01

    In recent years in most power systems all over the world, a trend towards the growing nonuniformity of energy consumption and generation schedules has been observed. The increase in the portion of renewable energy sources is one of the important challenges for many countries. The ill-predictable character of such energy sources necessitates a search for practical solutions. Presently, the most efficient method for compensating for nonuniform generation of the electric power by the renewable energy sources—predominantly by the wind and solar energy—is generation of power at conventional fossil-fuel-fired power stations. In Russia, this problem is caused by the increasing portion in the generating capacity structure of the nuclear power stations, which are most efficient when operating under basic conditions. Introduction of hydropower and pumped storage hydroelectric power plants and other energy-storage technologies does not cover the demand for load-following power capacities. Owing to a simple design, low construction costs, and a sufficiently high economic efficiency, gas turbine plants (GTPs) prove to be the most suitable for covering the nonuniform electric-demand schedules. However, when the gas turbines are operated under varying duty conditions, the lifetime of the primary thermostressed components is considerably reduced and, consequently, the repair costs increase. A method is proposed for determination of the total operating costs considering the deterioration of the gas turbine equipment under varying duty and start-stop conditions. A methodology for optimization of the loading modes for the gas turbine equipment is developed. The consideration of the lifetime component allows varying the optimal operating conditions and, in some cases, rejecting short-time stops of the gas turbine plants. The calculations performed in a wide range of varying fuel prices and capital investments per gas turbine equipment unit show that the economic effectiveness can be increased by 5-15% by varying the operating conditions and switching to the optimal operating modes. Consequently, irrespective of the fuel price, the application of the proposed method results in selection of the most beneficial operating conditions. Consideration of the lifetime expenditure included in the optimization criterion enables enhancement of the operating efficiency.

  16. Facility Systems, Ground Support Systems, and Ground Support Equipment General Design Requirements

    NASA Technical Reports Server (NTRS)

    Thaxton, Eric A.

    2014-01-01

    KSC-DE-512-SM establishes overall requirements and best design practices to be used at the John F. Kennedy Space Center (KSC) for the development of ground systems (GS) in support of operations at launch, landing, and retrieval sites. These requirements apply to the design and development of hardware and software for ground support equipment (GSE), ground support systems (GSS), and facility ground support systems (F-GSS) used to support the KSC mission for transportation, receiving, handling, assembly, test, checkout, servicing, and launch of space vehicles and payloads and selected flight hardware items for retrieval. This standards manual supplements NASA-STD-5005 by including KSC-site-specific and local environment requirements. These requirements and practices are optional for equipment used at manufacturing, development, and test sites.

  17. Power conditioning equipment for a thermoelectric outer planet spacecraft, volume 1, book 1

    NASA Technical Reports Server (NTRS)

    Andrews, R. E. (Editor)

    1972-01-01

    Equipment was designed to receive power from a radioisotope thermoelectric generator source, condition, distribute, and control this power for the spacecraft loads. The TOPS mission, aimed at a representative tour of the outer planets, would operate for an estimated 12 year period. Unique design characteristics required for the power conditioning equipment results from the long mission time and the need for autonomous on-board operations due to large communications distances and the associated time delays of ground initiated actions. The salient features of the selected power subsystem configuration are: (1) The PCE regulates the power from the radioisotope thermoelectric generator power source at 30 vdc by means of a quad-redundant shunt regulator; (2) 30 vdc power is used by certain loads, but is more generally inverted and distributed as square-wave ac power; (3) a protected bus is used to assure that power is always available to the control computer subsystem to permit corrective action to be initiated in response to fault conditions; and (4) various levels of redundancy are employed to provide high subsystem reliability.

  18. Space processing applications payload equipment study. Volume 2B: Payload interface analysis (power/thermal/electromagnetic compatibility)

    NASA Technical Reports Server (NTRS)

    Hammel, R. L. (Editor); Smith, A. G. (Editor)

    1974-01-01

    As a part of the task of performing preliminary engineering analysis of modular payload subelement/host vehicle interfaces, a subsystem interface analysis was performed to establish the integrity of the modular approach to the equipment design and integration. Salient areas that were selected for analysis were power and power conditioning, heat rejection and electromagnetic capability (EMC). The equipment and load profiles for twelve representative experiments were identified. Two of the twelve experiments were chosen as being representative of the group and have been described in greater detail to illustrate the evaluations used in the analysis. The shuttle orbiter will provide electrical power from its three fuel cells in support of the orbiter and the Spacelab operations. One of the three shuttle orbiter fuel cells will be dedicated to the Spacelab electrical power requirements during normal shuttle operation. This power supplies the Spacelab subsystems and the excess will be available to the payload. The current Spacelab sybsystem requirements result in a payload allocation of 4.0 to 4.8 kW average (24 hour/day) and 9.0 kW peak for 15 minutes.

  19. Mars mission science operations facilities design

    NASA Technical Reports Server (NTRS)

    Norris, Jeffrey S.; Wales, Roxana; Powell, Mark W.; Backes, Paul G.; Steinke, Robert C.

    2002-01-01

    A variety of designs for Mars rover and lander science operations centers are discussed in this paper, beginning with a brief description of the Pathfinder science operations facility and its strengths and limitations. Particular attention is then paid to lessons learned in the design and use of operations facilities for a series of mission-like field tests of the FIDO prototype Mars rover. These lessons are then applied to a proposed science operations facilities design for the 2003 Mars Exploration Rover (MER) mission. Issues discussed include equipment selection, facilities layout, collaborative interfaces, scalability, and dual-purpose environments. The paper concludes with a discussion of advanced concepts for future mission operations centers, including collaborative immersive interfaces and distributed operations. This paper's intended audience includes operations facility and situation room designers and the users of these environments.

  20. Risks and injuries in laser and high-frequency applications

    NASA Astrophysics Data System (ADS)

    Giering, K.; Philipp, Carsten M.; Berlien, Hans-Peter

    1995-01-01

    An analysis of injuries and risks using high frequency (HF) and lasers in medicine based on a literature search with MEDLINE was performed. The cases reported in the literature were classified according to the following criteria: (1) Avoidable in an optimal operational procedure. These kind of injuries are caused by a chain of unfortunate incidents. They are in principle avoidable by the 'right action at the right time' which presupposes an appropriate training of the operating team, selection of the optimal parameters for procedure and consideration of all safety instructions. (2) Avoidable, caused by malfunction of the equipment and/or accessories. The injuries classified into this group are avoidable if all safety regulations were fulfilled. This includes a pre-operational check-up and the use of medical lasers and high frequency devices only which meet the international safety standards. (3) Avoidable, caused by misuse/mistake. Injuries of this group were caused by an inappropriate selection of the procedure, wrong medical indication or mistakes during application. (4) Unavoidable, fateful. These injuries can be caused by risks inherent to the type of energy used, malfunction of the equipment and/or accessories though a pre-operational check-up was done. Some risks and complications are common to high frequency and laser application. But whereas these risks can be excluded easily in laser surgery there is often a great expenditure necessary or they are not avoidable if high frequency if used. No unavoidable risks due to laser energy occur.

  1. Energy Consumption of Die Casting Operations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jerald Brevick; clark Mount-Campbell; Carroll Mobley

    2004-03-15

    Molten metal processing is inherently energy intensive and roughly 25% of the cost of die-cast products can be traced to some form of energy consumption [1]. The obvious major energy requirements are for melting and holding molten alloy in preparation for casting. The proper selection and maintenance of melting and holding equipment are clearly important factors in minimizing energy consumption in die-casting operations [2]. In addition to energy consumption, furnace selection also influences metal loss due to oxidation, metal quality, and maintenance requirements. Other important factors influencing energy consumption in a die-casting facility include geographic location, alloy(s) cast, starting formmore » of alloy (solid or liquid), overall process flow, casting yield, scrap rate, cycle times, number of shifts per day, days of operation per month, type and size of die-casting form of alloy (solid or liquid), overall process flow, casting yield, scrap rate, cycle times, number of shifts per day, days of operation per month, type and size of die-casting machine, related equipment (robots, trim presses), and downstream processing (machining, plating, assembly, etc.). Each of these factors also may influence the casting quality and productivity of a die-casting enterprise. In a die-casting enterprise, decisions regarding these issues are made frequently and are based on a large number of factors. Therefore, it is not surprising that energy consumption can vary significantly from one die-casting enterprise to the next, and within a single enterprise as function of time.« less

  2. Nickel release from surgical instruments and operating room equipment.

    PubMed

    Boyd, Anne H; Hylwa, Sara A

    2018-04-15

    Background There has been no systematic study assessing nickel release from surgical instruments and equipment used within the operating suite. This equipment represents important potential sources of exposure for nickel-sensitive patients and hospital staff. To investigate nickel release from commonly used surgical instruments and operating room equipment. Using the dimethylglyoxime nickel spot test, a variety of surgical instruments and operating room equipment were tested for nickel release at our institution. Of the 128 surgical instruments tested, only 1 was positive for nickel release. Of the 43 operating room items tested, 19 were positive for nickel release, 7 of which have the potential for direct contact with patients and/or hospital staff. Hospital systems should be aware of surgical instruments and operating room equipment as potential sources of nickel exposure.

  3. 30 CFR 250.614 - Well-control fluids, equipment, and operations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Well-control fluids, equipment, and operations... OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Well-Workover Operations § 250.614 Well-control fluids, equipment, and operations. The following requirements apply during...

  4. 46 CFR 153.1130 - Failure of slops discharge recording equipment; operating with, reporting failures, and replacing...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Failure of slops discharge recording equipment; operating with, reporting failures, and replacing pollution equipment: Category A, B, C, D. 153.1130 Section... slops discharge recording equipment; operating with, reporting failures, and replacing pollution...

  5. 46 CFR 153.1130 - Failure of slops discharge recording equipment; operating with, reporting failures, and replacing...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 5 2011-10-01 2011-10-01 false Failure of slops discharge recording equipment; operating with, reporting failures, and replacing pollution equipment: Category A, B, C, D. 153.1130 Section... slops discharge recording equipment; operating with, reporting failures, and replacing pollution...

  6. 46 CFR 153.1130 - Failure of slops discharge recording equipment; operating with, reporting failures, and replacing...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 5 2012-10-01 2012-10-01 false Failure of slops discharge recording equipment; operating with, reporting failures, and replacing pollution equipment: Category A, B, C, D. 153.1130 Section... slops discharge recording equipment; operating with, reporting failures, and replacing pollution...

  7. 46 CFR 153.1130 - Failure of slops discharge recording equipment; operating with, reporting failures, and replacing...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 5 2014-10-01 2014-10-01 false Failure of slops discharge recording equipment; operating with, reporting failures, and replacing pollution equipment: Category A, B, C, D. 153.1130 Section... slops discharge recording equipment; operating with, reporting failures, and replacing pollution...

  8. 46 CFR 153.1130 - Failure of slops discharge recording equipment; operating with, reporting failures, and replacing...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 5 2013-10-01 2013-10-01 false Failure of slops discharge recording equipment; operating with, reporting failures, and replacing pollution equipment: Category A, B, C, D. 153.1130 Section... slops discharge recording equipment; operating with, reporting failures, and replacing pollution...

  9. 33 CFR 169.245 - What must a ship master do if LRIT equipment is switched off or fails to operate?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... LRIT equipment is switched off or fails to operate? 169.245 Section 169.245 Navigation and Navigable... master do if LRIT equipment is switched off or fails to operate? (a) If a ship's LRIT equipment is switched off or fails to operate, the ship's master must inform his or her Flag Administration without...

  10. 33 CFR 169.245 - What must a ship master do if LRIT equipment is switched off or fails to operate?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... LRIT equipment is switched off or fails to operate? 169.245 Section 169.245 Navigation and Navigable... master do if LRIT equipment is switched off or fails to operate? (a) If a ship's LRIT equipment is switched off or fails to operate, the ship's master must inform his or her Flag Administration without...

  11. 33 CFR 169.245 - What must a ship master do if LRIT equipment is switched off or fails to operate?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... LRIT equipment is switched off or fails to operate? 169.245 Section 169.245 Navigation and Navigable... master do if LRIT equipment is switched off or fails to operate? (a) If a ship's LRIT equipment is switched off or fails to operate, the ship's master must inform his or her Flag Administration without...

  12. 33 CFR 169.245 - What must a ship master do if LRIT equipment is switched off or fails to operate?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... LRIT equipment is switched off or fails to operate? 169.245 Section 169.245 Navigation and Navigable... master do if LRIT equipment is switched off or fails to operate? (a) If a ship's LRIT equipment is switched off or fails to operate, the ship's master must inform his or her Flag Administration without...

  13. Selecting the right ultrasound equipment--an administrator's perspective.

    PubMed

    Jacoby, Robert

    2003-01-01

    Recent advancements in ultrasound equipment, technology and capability make the selection of new or replacement equipment a difficult task. It is not uncommon that the sonographers will have different needs and wants from the equipment than do the radiologists. This potential hurdle needs to be addressed in order to arrive at a mutually acceptable selection. Vendors across the board all have very competitive products and they each have that special little "function" or "enhancement" that sets them apart from their competitor. The customer needs to approach the evaluation of the equipment in a very objective manner in order to truly understand not only the differences of each piece of equipment but the actual capability of each piece of equipment. In the end however, it is the individual sonographer that will be utilizing the equipment most of the time and they should have the final say to department management as to which equipment is selected.

  14. 14 CFR 121.345 - Radio equipment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Radio equipment. 121.345 Section 121.345..., FLAG, AND SUPPLEMENTAL OPERATIONS Instrument and Equipment Requirements § 121.345 Radio equipment. (a) No person may operate an airplane unless it is equipped with radio equipment required for the kind of...

  15. 46 CFR 109.347 - Pilot boarding equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Pilot boarding equipment. 109.347 Section 109.347... OPERATIONS Operation and Stowage of Safety Equipment § 109.347 Pilot boarding equipment. (a) The master or person in charge shall ensure that pilot boarding equipment is maintained as follows: (1) The equipment...

  16. 46 CFR 109.347 - Pilot boarding equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Pilot boarding equipment. 109.347 Section 109.347... OPERATIONS Operation and Stowage of Safety Equipment § 109.347 Pilot boarding equipment. (a) The master or person in charge shall ensure that pilot boarding equipment is maintained as follows: (1) The equipment...

  17. 25 CFR 542.23 - What are the minimum internal control standards for surveillance for Tier A gaming operations?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... trained in the use of the equipment, knowledge of the games, and house rules. (f) Each camera required by... device, the game board, and the activities of the employees responsible for drawing, calling, and entering the balls drawn or numbers selected. (j) Card games. The surveillance system shall record the...

  18. 25 CFR 542.23 - What are the minimum internal control standards for surveillance for Tier A gaming operations?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... trained in the use of the equipment, knowledge of the games, and house rules. (f) Each camera required by... device, the game board, and the activities of the employees responsible for drawing, calling, and entering the balls drawn or numbers selected. (j) Card games. The surveillance system shall record the...

  19. 25 CFR 542.23 - What are the minimum internal control standards for surveillance for Tier A gaming operations?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... trained in the use of the equipment, knowledge of the games, and house rules. (f) Each camera required by... device, the game board, and the activities of the employees responsible for drawing, calling, and entering the balls drawn or numbers selected. (j) Card games. The surveillance system shall record the...

  20. 25 CFR 542.23 - What are the minimum internal control standards for surveillance for Tier A gaming operations?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... trained in the use of the equipment, knowledge of the games, and house rules. (f) Each camera required by... device, the game board, and the activities of the employees responsible for drawing, calling, and entering the balls drawn or numbers selected. (j) Card games. The surveillance system shall record the...

  1. 25 CFR 542.23 - What are the minimum internal control standards for surveillance for Tier A gaming operations?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... trained in the use of the equipment, knowledge of the games, and house rules. (f) Each camera required by... device, the game board, and the activities of the employees responsible for drawing, calling, and entering the balls drawn or numbers selected. (j) Card games. The surveillance system shall record the...

  2. Optimizing biomass feedstock logistics for forest residue processing and transportation on a tree-shaped road network

    Treesearch

    Hee Han; Woodam Chung; Lucas Wells; Nathaniel Anderson

    2018-01-01

    An important task in forest residue recovery operations is to select the most cost-efficient feedstock logistics system for a given distribution of residue piles, road access, and available machinery. Notable considerations include inaccessibility of treatment units to large chip vans and frequent, long-distance mobilization of forestry equipment required to process...

  3. A study of space station needs, attributes, and architectural options, volume 2, technical. Book 2: Mission implementation concepts

    NASA Technical Reports Server (NTRS)

    1983-01-01

    Space station systems characteristics and architecture are described. A manned space station operational analysis is performed to determine crew size, crew task complexity and time tables, and crew equipment to support the definition of systems and subsystems concepts. This analysis is used to select and evaluate the architectural options for development.

  4. Effect of Aptitude on the Performance of Army Communications Operators

    DTIC Science & Technology

    1992-01-01

    equipment is usually concentrated at the highest echelons of command. 9 SLOWER 1 RT-773GRC-103(V) DA-437 GRC- 103M ~ (SYSTEM 1) ANGRC.153(V (SYSTEM 2) OA...Sg EU. ’-44 rh Ca- REFERENCES Campbell, John P. (ed.), "Project A: The U.S. Army Selection and Classification Project," Personnel Psychology, Vol. 43(2

  5. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Oland, CB

    Boiler owners and operators who need additional generating capacity face a number of legal, political, environmental, economic, and technical challenges. Their key to success requires selection of an adequately sized low-emission boiler and combustion equipment that can be operated in compliance with emission standards established by state and federal regulatory agencies. Recognizing that many issues are involved in making informed selection decisions, the U.S. Department of Energy (DOE), Office of Industrial Technologies (OIT) sponsored efforts at the Oak Ridge National Laboratory (ORNL) to develop a guide for use in choosing low-emission boilers and combustion equipment. To ensure that the guidemore » covers a broad range of technical and regulatory issues of particular interest to the commercial boiler industry, the guide was developed in cooperation with the American Boiler Manufacturers Association (ABMA), the Council of Industrial Boiler Owners (CIBO), and the U.S. Environmental Protection Agency (EPA). The guide presents topics pertaining to industrial, commercial, and institutional (ICI) boilers. Background information about various types of commercially available boilers is provided along with discussions about the fuels that they burn and the emissions that they produce. Also included are discussions about emissions standards and compliance issues, technical details related to emissions control techniques, and other important selection considerations. Although information in the guide is primarily applicable to new ICI boilers, it may also apply to existing boiler installations.« less

  6. Comprehensive review on endonasal endoscopic sinus surgery

    PubMed Central

    Weber, Rainer K.; Hosemann, Werner

    2015-01-01

    Endonasal endoscopic sinus surgery is the standard procedure for surgery of most paranasal sinus diseases. Appropriate frame conditions provided, the respective procedures are safe and successful. These prerequisites encompass appropriate technical equipment, anatomical oriented surgical technique, proper patient selection, and individually adapted extent of surgery. The range of endonasal sinus operations has dramatically increased during the last 20 years and reaches from partial uncinectomy to pansinus surgery with extended surgery of the frontal (Draf type III), maxillary (grade 3–4, medial maxillectomy, prelacrimal approach) and sphenoid sinus. In addition there are operations outside and beyond the paranasal sinuses. The development of surgical technique is still constantly evolving. This article gives a comprehensive review on the most recent state of the art in endoscopic sinus surgery according to the literature with the following aspects: principles and fundamentals, surgical techniques, indications, outcome, postoperative care, nasal packing and stents, technical equipment. PMID:26770282

  7. 40 CFR 63.5734 - What standards must I meet for resin and gel coat application equipment cleaning operations?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...? (a) For routine flushing of resin and gel coat application equipment (e.g., spray guns, flowcoaters... and gel coat application equipment cleaning operations? 63.5734 Section 63.5734 Protection of... Pollutants for Boat Manufacturing Standards for Resin and Gel Coat Application Equipment Cleaning Operations...

  8. Air Force Operational Medicine: Using the Enterprise Estimating Supplies Program to Develop Materiel Solutions for the Operational Requirements of the Air Force Oral Surgery Team (FFMAX)

    DTIC Science & Technology

    2010-10-14

    non-battle injuries , and illnesses. International Classification of Diseases, Ninth Revision (ICD-9) coded patient conditions that have been selected...The patient stream was used to simulate the equipment and supply requirements for the range of surgical cases and non-surgical injuries and illnesses...supplies” column identifies the items needed to complete the “Insert endo - trach tube” task at that level of capability. Not shown in this figure are

  9. Dairy Equipment Lubrication

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Lake To Lake Dairy Cooperative, Manitowoc, Wisconsin, operates four plants in Wisconsin for processing milk, butter and cheese products from its 1,300 member farms. The large co-op was able to realize substantial savings by using NASA information for improved efficiency in plant maintenance. Under contract to Marshall Space Flight Center, Midwest Research Institute compiled a handbook consolidating information about commercially available lubricants. The handbook details chemical and physical properties, applications, specifications, test procedures and test data for liquid and solid lubricants. Lake To Lake's plant engineer used the handbook to effect savings in maintenance labor and materials costs by reducing the number of lubricants used on certain equipment. Strict U.S. Department of Agriculture and Food and Drug Administration regulations preclude lubrication changes n production equipment, but the co-op's maintenance chief was able to eliminate seven types of lubricants for ancillary equipment, such as compressors and high pressure pumps. Handbook data enabled him to select comparable but les expensive lubricants in the materials consolidation process, and simplified lubrication schedules and procedures. The handbook is in continuing use as a reference source when a new item of equipment is purchased.

  10. Comparison of dose accuracy between 2D array detectors and Epid for IMRT of nasopharynx cancer

    NASA Astrophysics Data System (ADS)

    Altiparmak, Duygu; Coban, Yasin; Merih, Adil; Avci, Gulhan Guler; Yigitoglu, Ibrahim

    2017-02-01

    The aim of this study is to perform the dosimetric controls of nasopharynx cancer patient's intensity modulated radiation therapy (IMRT) treatment plans that generated by treatment planing system (TPS) with using two different equipments and also to make comparison in terms of their reliability and practicability. This study has been performed at Radiation Oncology Department, Medicine Faculty in Gaziosmanpasa University by using the VARIAN CLINAC DHX linear accelerator which is operated in the range of 6 MV. Selected 10 nasopharynx patients planned in TPS (Eclipce V13.0) and approved for treatment by medical physicists and radiation oncologists. These plans recalculated on EPID and mapcheck which are 2D dosimetric equipments to obtain dose maps. To compare these two dosimetric equipments gamma analysis method has been preferred. Achieved data is presented and discussed.

  11. Vaccine delivery management.

    PubMed

    Cheyne, J

    1989-01-01

    During the typical 12- to 18-month voyage of a vaccine from manufacturer to immunization site, many situations arise in which the cold chain may be interrupted. Extensive efforts have been made in the 1980s to ensure an uninterrupted cold chain through the use of improved equipment and better training of personnel. One important advance is the vaccine cold-chain monitor, which identifies weak spots in the cold chain and prevents the use of heat-damaged vaccine. Further improvements will require efforts by the recipient countries (e.g., better use of the private sector for transport and equipment management), by donor agencies (e.g., greater consideration of the operational and maintenance costs of the equipment selected and resolution of fuel shortages), and by industry (e.g., more appropriate packaging and pricing of vaccine, extension of the expiration period, and increased heat stability.

  12. Installation and Initial Operation of DOE's 449-MHz Wind Profiling Radars on the U.S. West Coast

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Flaherty, Julia E.; Shaw, William J.; Morris, Victor R.

    The U.S. Department of Energy (DOE), in collaboration with the National Oceanic and Atmospheric Administration (NOAA), has recently completed the installation of three new wind profiling radars on the Washington and Oregon coasts. These systems operate at a frequency of 449 MHz and provide mean wind profiles to a height of roughly 8 km, with the maximum measurement height depending on time-varying atmospheric conditions. This is roughly half the depth of the troposphere at these latitudes. Each system is also equipped with a radio acoustic sounding system (RASS), which provides a measure of the temperature profile to heights of approximatelymore » 2 km. Other equipment deployed alongside the radar includes a surface meteorological station and GPS for column water vapor. This project began in fiscal year 2014, starting with equipment procurements and site selection. In addition, environmental reviews, equipment assembly and testing, site access agreements, and infrastructure preparations have been performed. Finally, with equipment deployment with data collection and dissemination, the primary tasks of this project have been completed. The three new wind profiling radars have been deployed at airports near Coos Bay, OR, and Astoria, OR, and at an industrial park near Forks, WA. Data are available through the NOAA Earth Systems Research Laboratory Data Display website, and will soon be made available through the DOE Atmosphere to Electrons data archive and portal as well.« less

  13. Selecting PPE for the Workplace (Personal Protective Equipment for the Eyes and Face)

    MedlinePlus

    ... Additional References Site Map Credits Selecting Personal Protective Equipment (PPE) for the Workplace Impact Heat Chemicals Dust Optical Radiation OSHA Requirements Home | Selecting Personal Protective Equipment (PPE) for the Workplace | OSHA Requirements Site Map | ...

  14. Concept considerations for a small orbital transfer vehicle

    NASA Technical Reports Server (NTRS)

    Green, M.; Sibila, A. I.

    1979-01-01

    This paper summarizes a study of small orbital transfer vehicles to place payloads in orbits with altitudes above those of the standard Shuttle operations. The overall objective of the study is to examine the role of the small orbital transfer vehicle (SOTV) in Shuttle operations and to identify typical propulsion concepts for accomplishing the mission. Consideration is given to existing and planned systems and upper stages, along with new propulsion stages. The new propulsion concept development examines tandem and clustered solids, controlled solids, monopropellant and bipropellant liquids, and staged solid/liquid combinations. The paper presents considerations of the mission requirements, tradeoffs of the various configurations, and candidate selections. For the selected candidate concepts the performance, support equipment, operational considerations and program costs were determined. The results show that a new modular liquid stage system is cost effective in handling the majority of the payloads considered. The remainder of the payloads can be accomodated by existing systems.

  15. Station descriptions and availability of discharge and water-quality data through 1985 for eastern Montana stream sites not included in the National Water Data Exchange Program

    USGS Publications Warehouse

    Groskinsky Link, B. L.; Cary, L.E.

    1988-01-01

    Stations were selected to monitor water discharge and water quality of streams in eastern Montana. This report describes the stations and indicates the availability of hydrologic data through 1985. Included are stations that are operated by organizations that do not belong to the National Water Data Exchange (NAWDEX) program operated by the U.S. Geological Survey. Each station description contains a narration of the station 's history including location, drainage area, elevation, operator, period of record, type of equipment and instruments used at the station, and data availability. The data collected at each station have been identified according to type: water discharge, chemical quality, and suspended sediment. Descriptions are provided for 113 stations. These data have potential uses in characterizing small hydrologic basins, as well as other uses. A map of eastern Montana shows the location of the stations selected. (USGS)

  16. 49 CFR 383.95 - Restrictions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... person is restricted from operating a CMV equipped with any type of air brakes. (2) For the purposes of... person is restricted from operating a CMV equipped with any braking system operating fully on the air... restricted from operating a CMV equipped with a manual transmission. (2) For the purposes of the skills test...

  17. 49 CFR 383.95 - Restrictions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... person is restricted from operating a CMV equipped with any type of air brakes. (2) For the purposes of... person is restricted from operating a CMV equipped with any braking system operating fully on the air... restricted from operating a CMV equipped with a manual transmission. (2) For the purposes of the skills test...

  18. 49 CFR 383.95 - Restrictions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... person is restricted from operating a CMV equipped with any type of air brakes. (2) For the purposes of... person is restricted from operating a CMV equipped with any braking system operating fully on the air... restricted from operating a CMV equipped with a manual transmission. (2) For the purposes of the skills test...

  19. 30 CFR 56.9102 - Movement of independently operating rail equipment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Movement of independently operating rail... MINES Loading, Hauling, and Dumping Traffic Safety § 56.9102 Movement of independently operating rail equipment. Movement of two or more pieces of rail equipment operating independently on the same track shall...

  20. 30 CFR 57.9102 - Movement of independently operating rail equipment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Movement of independently operating rail... NONMETAL MINES Loading, Hauling, and Dumping Traffic Safety § 57.9102 Movement of independently operating rail equipment. Movement of two or more pieces of rail equipment operating independently on the same...

  1. 30 CFR 56.9101 - Operating speeds and control of equipment.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Operating speeds and control of equipment. 56... Loading, Hauling, and Dumping Traffic Safety § 56.9101 Operating speeds and control of equipment.... Operating speeds shall be consistent with conditions of roadways, tracks, grades, clearance, visibility, and...

  2. 30 CFR 56.9101 - Operating speeds and control of equipment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Operating speeds and control of equipment. 56... Loading, Hauling, and Dumping Traffic Safety § 56.9101 Operating speeds and control of equipment.... Operating speeds shall be consistent with conditions of roadways, tracks, grades, clearance, visibility, and...

  3. 30 CFR 57.9101 - Operating speeds and control of equipment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Operating speeds and control of equipment. 57... Loading, Hauling, and Dumping Traffic Safety § 57.9101 Operating speeds and control of equipment.... Operating speeds shall be consistent with conditions of roadways, tracks, grades, clearance, visibility, and...

  4. 30 CFR 57.9101 - Operating speeds and control of equipment.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Operating speeds and control of equipment. 57... Loading, Hauling, and Dumping Traffic Safety § 57.9101 Operating speeds and control of equipment.... Operating speeds shall be consistent with conditions of roadways, tracks, grades, clearance, visibility, and...

  5. Reactor Operations Monitoring System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hart, M.M.

    1989-01-01

    The Reactor Operations Monitoring System (ROMS) is a VME based, parallel processor data acquisition and safety action system designed by the Equipment Engineering Section and Reactor Engineering Department of the Savannah River Site. The ROMS will be analyzing over 8 million signal samples per minute. Sixty-eight microprocessors are used in the ROMS in order to achieve a real-time data analysis. The ROMS is composed of multiple computer subsystems. Four redundant computer subsystems monitor 600 temperatures with 2400 thermocouples. Two computer subsystems share the monitoring of 600 reactor coolant flows. Additional computer subsystems are dedicated to monitoring 400 signals from assortedmore » process sensors. Data from these computer subsystems are transferred to two redundant process display computer subsystems which present process information to reactor operators and to reactor control computers. The ROMS is also designed to carry out safety functions based on its analysis of process data. The safety functions include initiating a reactor scram (shutdown), the injection of neutron poison, and the loadshed of selected equipment. A complete development Reactor Operations Monitoring System has been built. It is located in the Program Development Center at the Savannah River Site and is currently being used by the Reactor Engineering Department in software development. The Equipment Engineering Section is designing and fabricating the process interface hardware. Upon proof of hardware and design concept, orders will be placed for the final five systems located in the three reactor areas, the reactor training simulator, and the hardware maintenance center.« less

  6. 49 CFR 195.430 - Firefighting equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Firefighting equipment. 195.430 Section 195.430... PIPELINE Operation and Maintenance § 195.430 Firefighting equipment. Each operator shall maintain adequate firefighting equipment at each pump station and breakout tank area. The equipment must be— (a) In proper...

  7. Maintenance Free Fluidic Transfer and Mixing Devices for Highly Radioactive Applications - Design, Development, Deployment and Operational Experience

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Phillips, C.; Richardson, J. E.; Fallows, P.

    2006-07-01

    Power Fluidics is the generic name for a range of maintenance-free fluid transfer and mixing devices, capable of handling a wide range of highly radioactive fluids, jointly developed by British Nuclear Group, its US-based subsidiary BNG America, and AEA Technology. Power Fluidic devices include Reverse Flow Diverters (RFDs), Vacuum Operated Slug Lifts (VOSLs), and Air Lifts, all of which have an excellent proven record for pumping radioactive liquids and sludges. Variants of the RFD, termed Pulse Jet Mixers (PJMs) are used to agitate and mix tank contents, where maintenance-free equipment is desirable, and where a high degree of homogenization ismore » necessary. The equipment is designed around the common principle of using compressed air to provide the motive force to transfer liquids and sludges. These devices have no moving parts in contact with the radioactive medium and therefore require no maintenance in radioactive areas of processing plants. Once commissioned, Power Fluidic equipment has been demonstrated to operate for the life of the facility. Over 800 fluidic devices continue to operate safely and reliably in British Nuclear Group's nuclear facilities at the Sellafield site in the United Kingdom, and some of these have done so for almost 40 years. More than 400 devices are being supplied by AEA Technology and BNG America for the Waste Treatment Plant (WTP) at the Hanford Site in southeastern Washington State, USA. This paper discusses: - Principles of operation of fluidic pumps and mixers. - Selection criteria and design of fluidic pumps and mixers. - Operational experience of fluidic pumps and mixers in the United Kingdom. - Applications of fluidic pumps and mixers at the U.S. Department of Energy nuclear sites. (authors)« less

  8. 30 CFR 56.14101 - Brakes.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... mobile equipment shall be equipped with a service brake system capable of stopping and holding the... which is not originally equipped with brakes unless the manner in which the equipment is being operated requires the use of brakes for safe operation. This standard does not apply to rail equipment. (2) If...

  9. 30 CFR 57.14101 - Brakes.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... mobile equipment shall be equipped with a service brake system capable of stopping and holding the... which is not originally equipped with brakes unless the manner in which the equipment is being operated requires the use of brakes for safe operation. This standard does not apply to rail equipment. (2) If...

  10. 30 CFR 57.14200 - Warnings prior to starting or moving equipment.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Warnings prior to starting or moving equipment... NONMETAL MINES Machinery and Equipment Safety Practices and Operational Procedures § 57.14200 Warnings... equipment, equipment operators shall sound a warning that is audible above the surrounding noise level or...

  11. 30 CFR 57.14200 - Warnings prior to starting or moving equipment.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Warnings prior to starting or moving equipment... NONMETAL MINES Machinery and Equipment Safety Practices and Operational Procedures § 57.14200 Warnings... equipment, equipment operators shall sound a warning that is audible above the surrounding noise level or...

  12. 33 CFR 150.510 - How must tested emergency equipment be operated?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false How must tested emergency equipment be operated? 150.510 Section 150.510 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF... Operational Tests and Inspections (general) § 150.510 How must tested emergency equipment be operated? The...

  13. 33 CFR 150.510 - How must tested emergency equipment be operated?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false How must tested emergency equipment be operated? 150.510 Section 150.510 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF... Operational Tests and Inspections (general) § 150.510 How must tested emergency equipment be operated? The...

  14. Eddy current inspection tool. [Patent application

    DOEpatents

    Petrini, R.R.; Van Lue, D.F.

    1980-10-29

    A miniaturized inspection tool, for testing and inspection of metal objects in locations with difficult accessibility, which comprises eddy current sensing equipment with a probe coil, and associated coaxial coil cable, oil energizing means, and circuit means responsive to impedance changes in the coil as effected by induced eddy currents in a test object to produce a data output signal proportional to such changes. The coil and cable are slideably received in the utility channel of the flexible insertion tube of a fiberoptic scope. The scope is provided with light transmitting and receiving fiberoptics for viewing through the flexible tube, and articulation means for articulating the distal end of the tube and permitting close control of coil placement relative to a test object. The eddy current sensing equipment includes a tone generator for generating audible signals responsive to the data output signal. In one selected mode of operation, the tone generator responsive to the output signal above a selected level generates a constant single frequency tone for signalling detection of a discontinuity and, in a second selected mode, generates a tone whose frequency is proportional to the difference between the output signal and a predetermined selected threshold level.

  15. Method of Data storing, collection and aggregation for definition of life-cycle resources of electromechanical equipment

    NASA Astrophysics Data System (ADS)

    Zhukovskiy, Y.; Koteleva, N.

    2017-10-01

    Analysis of technical and technological conditions for the emergence of emergency situations during the operation of electromechanical equipment of enterprises of the mineral and raw materials complex shows that when developing the basis for ensuring safe operation, it is necessary to take into account not only the technical condition, but also the non-stationary operation of the operating conditions of equipment, and the nonstationarity of operational operating parameters of technological processes. Violations of the operation of individual parts of the machine, not detected in time, can lead to severe accidents at work, as well as to unplanned downtime and loss of profits. That is why, the issues of obtaining and processing Big data obtained during the life cycle of electromechanical equipment, for assessing the current state of the electromechanical equipment used, timely diagnostics of emergency and pre-emergency modes of its operation, estimating the residual resource, as well as prediction the technical state on the basis of machine learning are very important. This article is dedicated to developing the special method of data storing, collection and aggregation for definition of life-cycle resources of electromechanical equipment. This method can be used in working with big data and can allow extracting the knowledge from different data types: the plants’ historical data and the factory historical data. The data of the plants contains the information about electromechanical equipment operation and the data of the factory contains the information about a production of electromechanical equipment.

  16. SUNY Health Science Center at Syracuse: Controls over Some Hospital Expenses Could Be Improved. Report 92-S-50.

    ERIC Educational Resources Information Center

    Walsh, John T.; And Others

    An audit was done of the Health Science Center, a teaching hospital in the State University of New York (SUNY) system at Syracuse. The audit addressed whether Syracuse has effective controls over selected payroll, equipment and inventory expenses. Syracuse reported an operating loss for 1990 of over $21 million dollars. The audit found that…

  17. Optics education for machine operators in the semiconductor industry: moving beyond button pushing

    NASA Astrophysics Data System (ADS)

    Karakekes, Meg; Currier, Deborah

    1995-10-01

    In the competitive semiconductor manufacturing industry, employees who operate equipment are able to make greater contributions if they understand how the equipment works. By understanding the 'why' behind the 'what', the equipment operators can better partner with other technical staff to produce quality integrated circuits efficiently and effectively. This additional knowledge also opens equipment operators to job enrichment and enlargement opportunities. Advanced Micro Devices (AMD) is in the process of upgrading the skills of its equipment operators. This paper is an overview of a pilot program that employs optics education to upgrade stepper operators' skills. The paper starts with stepper tasks that require optics knowledge, examines teaching methods, reports both end-of-course and three months post-training knowledge retention, and summarizes how the training has impacted the production floor.

  18. Design of a Lunar Farside Observatory

    NASA Technical Reports Server (NTRS)

    1989-01-01

    The design of a mantendable lunar farside observatory and science base is presented. A farside observatory will allow high accuracy astronomical observations, as well as the opportunity to perform geological and low gravity studies on the Moon. The requirements of the observatory and its support facilities are determined, and a preliminary timeline for the project development is presented. The primary areas of investigation include observatory equipment, communications, habitation, and surface operations. Each area was investigated to determine the available options, and each option was evaluated to determine the advantages and disadvantages. The options selected for incorporation into the design of the farside base are presented. The observatory equipment deemed most suitable for placement on the lunar farside consist of large optical and radio arrays and seismic equipment. A communications system consisting of a temporary satellite about the L sub 2 libration point and followed by a satellite at the stable L sub 5 libration point was selected. A space station common module was found to be the most practical option for housing the astronauts at the base. Finally, a support system based upon robotic construction vehicles and the use of lunar materials was determined to be a necessary component of the base.

  19. User Guide: How to Use and Operate Virtual Reality Equipment in the Systems Assessment and Usability Laboratory (SAUL) for Conducting Demonstrations

    DTIC Science & Technology

    2017-08-01

    ARL-TN-0839 ● AUG 2017 US Army Research Laboratory User Guide: How to Use and Operate Virtual Reality Equipment in the Systems...ARL-TN-0839 ● AUG 2017 US Army Research Laboratory User Guide: How to Use and Operate Virtual Reality Equipment in the Systems...September 2017 4. TITLE AND SUBTITLE User Guide: How to Use and Operate Virtual Reality Equipment in the Systems Assessment and Usability Laboratory

  20. An Energy Saver Called NECAP

    NASA Technical Reports Server (NTRS)

    1979-01-01

    One of the most comprehensive and most effective programs is NECAP, an acronym for NASA Energy Cost Analysis Program. Developed by Langley Research Center, NECAP operates according to heating/cooling calculation procedures formulated by the American Society of Heating, Refrigeration and Air Conditioning Engineers (ASHRAE). The program enables examination of a multitude of influences on heat flow into and out of buildings. For example, NECAP considers traditional weather patterns for a given locale and predicts the effects on a particular building design of sun, rain, wind, even shadows from other buildings. It takes into account the mass of structural materials, insulating values, the type of equipment the building will house, equipment operating schedules, heat by people and machinery, heat loss or gain through windows and other openings and a variety of additional details. NECAP ascertains how much energy the building should require ideally, aids selection of the most economical and most efficient energy systems and suggests design and operational measures for reducing the building's energy needs. Most importantly, NECAP determines cost effectiveness- whether an energy-saving measure will pay back its installation cost through monetary savings in energy bills. thrown off

  1. Study on energy consumption evaluation of mountainous highway based on LCA

    NASA Astrophysics Data System (ADS)

    Fei, Lunlin; Zhang, Qi; Xie, Yongqing

    2017-06-01

    For the system to understand the road construction energy consumption process, this paper selects a typical mountainous highway in the south, using the theory and method of Life Cycle Assessment (LCA) to quantitatively study the energy consumption of the whole process of highway raw materials production, construction and operation. The results show that the energy consumption in the raw material production stage is the highest, followed by the highway operation and construction stage. The energy consumption per unit of tunnel engineering, bridge engineering, roadbed engineering and pavement engineering in the construction phase are 2279.00 tce, 1718.07 tce, 542.19 tce and 34.02 tce, and in operational phase, 85.44% of electricity consumption comes from tunnel ventilation and lighting. Therefore, in the bridge and tunnel construction process, we should promote energy-saving innovation of the construction technology and mechanical equipment, and further strengthen the research and development of tunnel ventilation, lighting energy-saving equipment and intelligent control technology, which will help significantly reduce the energy consumption and greenhouse gas emissions of the life cycle of highway.

  2. Control banding assessment of workers' exposure to indium and its compounds in 13 Japanese indium plants.

    PubMed

    Higashikubo, Ichiro; Arito, Heihachiro; Ando, Kenji; Araki, Akihiro; Shimizu, Hidesuke; Sakurai, Haruhiko

    2018-05-25

    This study aimed to assess workers' exposure to indium and its compounds in 55 indium-handling operations among 13 Japanese plants. The surveyed plants were selected from indium-manufacturing plants whose annual indium production exceeded 500 kg. The Control of Substances Hazardous to Health (COSHH) Essentials control banding toolkit, which contains simple scales for hazard levels, quantities in daily use, and "dustiness" characteristics, was used to assess generic risks of indium-handling operations. The operations were then classified into one of four Control Approaches (CAs). There were 35 indium-handling operations classified into CA4 (requires expert advice) and 16 grouped into CA3 (requires containment). There were three operations classified into CA2 (requires engineering controls) and only one into CA1 (requires good general ventilation (GV) and working practices). Of the 51 operations classified as CA4 and CA3, 36 were found to be improperly equipped with local exhaust ventilation, and the remaining 15 operations solely relied on GV practices. Respiratory protective equipment (RPE) used in the 13 indium plants was examined with reference to the recommendations of the COSHH Essentials and Japan's Technical Guidelines. Our findings suggest that stringent engineering control measures and respiratory protection from indium dust are needed to improve indium-handling operations. Our results show that the most common control approach for Japanese indium-handling operations is to require expert advice, including worker health checks for respiratory diseases and exposure measurement by air sampling.

  3. Increasing the efficiency of the condensing boiler

    NASA Astrophysics Data System (ADS)

    Zaytsev, O. N.; Lapina, E. A.

    2017-11-01

    Analysis of existing designs of boilers with low power consumption showed that the low efficiency of the latter is due to the fact that they work in most cases when the heating period in the power range is significantly less than the nominal power. At the same time, condensing boilers do not work in the most optimal mode (in condensing mode) in the central part of Russia, a significant part of their total operating time during the heating season. This is due to existing methods of equipment selection and joint operation with heating systems with quantitative control of the coolant. It was also revealed that for the efficient operation of the heating system, it is necessary to reduce the inertia of the heat generating equipment. Theoretical patterns of thermal processes in the furnace during combustion gas at different radiating surfaces location schemes considering the influence of the very furnace configuration, characterized in that to reduce the work condensing boiler in conventional gas boiler operation is necessary to maintain a higher temperature in the furnace (in the part where spiral heat exchangers are disposed), which is possible when redistributing heat flow - increase the proportion of radiant heat from the secondary burner emitter allow Perey For the operation of the condensing boiler in the design (condensation) mode practically the entire heating period.

  4. Low cost solar array project production process and equipment task: A Module Experimental Process System Development Unit (MEPSDU)

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Several major modifications were made to the design presented at the PDR. The frame was deleted in favor of a "frameless" design which will provide a substantially improved cell packing factor. Potential shaded cell damage resulting from operation into a short circuit can be eliminated by a change in the cell series/parallel electrical interconnect configuration. The baseline process sequence defined for the MEPSON was refined and equipment design and specification work was completed. SAMICS cost analysis work accelerated, format A's were prepared and computer simulations completed. Design work on the automated cell interconnect station was focused on bond technique selection experiments.

  5. 40 CFR 243.201-2 - Recommended procedures: Operations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... waste handling techniques, and in the proper operation of collection equipment, such as those presented in Operation Responsible: Safe Refuse Collection. (b) Personal protective equipment such as gloves... Standards for Subpart I—Personal Protective Equipment (29 CFR 1910.132 through 1910.137). (c) Scavenging...

  6. 40 CFR 243.201-2 - Recommended procedures: Operations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... waste handling techniques, and in the proper operation of collection equipment, such as those presented in Operation Responsible: Safe Refuse Collection. (b) Personal protective equipment such as gloves... Standards for Subpart I—Personal Protective Equipment (29 CFR 1910.132 through 1910.137). (c) Scavenging...

  7. Brachytherapy

    MedlinePlus

    ... care for brachytherapy catheters. top of page What equipment is used? For permanent implants, radioactive material (which ... the tumor. top of page Who operates the equipment? The equipment is operated by a medical physicist, ...

  8. Equipment Operator 1 & C.

    ERIC Educational Resources Information Center

    Naval Education and Training Program Development Center, Pensacola, FL.

    The Rate Training Manual and Nonresident Career Course (RTM/NRCC) form a self-study package to assist Navy Equipment Operators First and Chief in fulfilling the requirements of their rating. (Navy Equipment Operators First and Chief direct and coordinate efforts of individuals and crews in construction, earthmoving, roadbuilding, quarrying, and…

  9. 75 FR 66683 - Defense Federal Acquisition Regulation Supplement; Safety of Facilities, Infrastructure, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-29

    ... operation of facilities, infrastructure, and equipment for use by DoD military or civilian should be...-7004, Safety of Facilities, Infrastructure, and Equipment for Military Operations. DFARS 246.270-1... operation of facilities. This includes contracts for facilities, infrastructure, and equipment configured...

  10. Lunar base surface mission operations. Lunar Base Systems Study (LBSS) task 4.1

    NASA Technical Reports Server (NTRS)

    1987-01-01

    The purpose was to perform an analysis of the surface operations associated with a human-tended lunar base. Specifically, the study defined surface elements and developed mission manifests for a selected base scenario, determined the nature of surface operations associated with this scenario, generated a preliminary crew extravehicular and intravehicular activity (EVA/IVA) time resource schedule for conducting the missions, and proposed concepts for utilizing remotely operated equipment to perform repetitious or hazardous surface tasks. The operations analysis was performed on a 6 year period of human-tended lunar base operation prior to permanent occupancy. The baseline scenario was derived from a modified version of the civil needs database (CNDB) scenario. This scenario emphasizes achievement of a limited set of science and exploration objectives while emplacing the minimum habitability elements required for a permanent base.

  11. Laboratory services series: a programmed maintenance system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tuxbury, D.C.; Srite, B.E.

    1980-01-01

    The diverse facilities, operations and equipment at a major national research and development laboratory require a systematic, analytical approach to operating equipment maintenance. A computer-scheduled preventive maintenance program is described including program development, equipment identification, maintenance and inspection instructions, scheduling, personnel, and equipment history.

  12. 14 CFR 135.167 - Emergency equipment: Extended overwater operations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Emergency equipment: Extended overwater... Aircraft and Equipment § 135.167 Emergency equipment: Extended overwater operations. (a) Except where the... of the certificate holder, the Administrator allows deviation for a particular extended overwater...

  13. 14 CFR 135.167 - Emergency equipment: Extended overwater operations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Emergency equipment: Extended overwater... Aircraft and Equipment § 135.167 Emergency equipment: Extended overwater operations. (a) Except where the... of the certificate holder, the Administrator allows deviation for a particular extended overwater...

  14. 14 CFR 135.167 - Emergency equipment: Extended overwater operations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Emergency equipment: Extended overwater... Aircraft and Equipment § 135.167 Emergency equipment: Extended overwater operations. (a) Except where the... of the certificate holder, the Administrator allows deviation for a particular extended overwater...

  15. 14 CFR 135.167 - Emergency equipment: Extended overwater operations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Emergency equipment: Extended overwater... Aircraft and Equipment § 135.167 Emergency equipment: Extended overwater operations. (a) Except where the... of the certificate holder, the Administrator allows deviation for a particular extended overwater...

  16. 14 CFR 135.167 - Emergency equipment: Extended overwater operations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Emergency equipment: Extended overwater... Aircraft and Equipment § 135.167 Emergency equipment: Extended overwater operations. (a) Except where the... of the certificate holder, the Administrator allows deviation for a particular extended overwater...

  17. 14 CFR 121.358 - Low-altitude windshear system equipment requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Low-altitude windshear system equipment... OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Instrument and Equipment Requirements § 121.358 Low-altitude windshear system equipment requirements. (a) Airplanes manufactured after January...

  18. 14 CFR 121.358 - Low-altitude windshear system equipment requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Low-altitude windshear system equipment... OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Instrument and Equipment Requirements § 121.358 Low-altitude windshear system equipment requirements. (a) Airplanes manufactured after January...

  19. 14 CFR 121.358 - Low-altitude windshear system equipment requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Low-altitude windshear system equipment... OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Instrument and Equipment Requirements § 121.358 Low-altitude windshear system equipment requirements. (a) Airplanes manufactured after January...

  20. 14 CFR 121.358 - Low-altitude windshear system equipment requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Low-altitude windshear system equipment... OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Instrument and Equipment Requirements § 121.358 Low-altitude windshear system equipment requirements. (a) Airplanes manufactured after January...

  1. 14 CFR 121.358 - Low-altitude windshear system equipment requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Low-altitude windshear system equipment... OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Instrument and Equipment Requirements § 121.358 Low-altitude windshear system equipment requirements. (a) Airplanes manufactured after January...

  2. CAL--ERDA program manual. [Building Design Language; LOADS, SYSTEMS, PLANT, ECONOMICS, REPORT, EXECUTIVE, CAL-ERDA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hunn, B. D.; Diamond, S. C.; Bennett, G. A.

    1977-10-01

    A set of computer programs, called Cal-ERDA, is described that is capable of rapid and detailed analysis of energy consumption in buildings. A new user-oriented input language, named the Building Design Language (BDL), has been written to allow simplified manipulation of the many variables used to describe a building and its operation. This manual provides the user with information necessary to understand in detail the Cal-ERDA set of computer programs. The new computer programs described include: an EXECUTIVE Processor to create computer system control commands; a BDL Processor to analyze input instructions, execute computer system control commands, perform assignments andmore » data retrieval, and control the operation of the LOADS, SYSTEMS, PLANT, ECONOMICS, and REPORT programs; a LOADS analysis program that calculates peak (design) zone and hourly loads and the effect of the ambient weather conditions, the internal occupancy, lighting, and equipment within the building, as well as variations in the size, location, orientation, construction, walls, roofs, floors, fenestrations, attachments (awnings, balconies), and shape of a building; a Heating, Ventilating, and Air-Conditioning (HVAC) SYSTEMS analysis program capable of modeling the operation of HVAC components including fans, coils, economizers, humidifiers, etc.; 16 standard configurations and operated according to various temperature and humidity control schedules. A plant equipment program models the operation of boilers, chillers, electrical generation equipment (diesel or turbines), heat storage apparatus (chilled or heated water), and solar heating and/or cooling systems. An ECONOMIC analysis program calculates life-cycle costs. A REPORT program produces tables of user-selected variables and arranges them according to user-specified formats. A set of WEATHER ANALYSIS programs manipulates, summarizes and plots weather data. Libraries of weather data, schedule data, and building data were prepared.« less

  3. 48 CFR 252.246-7004 - Safety of Facilities, Infrastructure, and Equipment for Military Operations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...: SAFETY OF FACILITIES, INFRASTRUCTURE, AND EQUIPMENT FOR MILITARY OPERATIONS (OCT 2010) (a) Definition... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Safety of Facilities, Infrastructure, and Equipment for Military Operations. 252.246-7004 Section 252.246-7004 Federal Acquisition...

  4. 14 CFR 105.13 - Radio equipment and use requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Radio equipment and use requirements. 105... (CONTINUED) AIR TRAFFIC AND GENERAL OPERATING RULES PARACHUTE OPERATIONS Operating Rules § 105.13 Radio...) The aircraft is equipped with a functioning two-way radio communication system appropriate to the air...

  5. 14 CFR 121.339 - Emergency equipment for extended over-water operations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Emergency equipment for extended over-water... § 121.339 Emergency equipment for extended over-water operations. (a) Except where the Administrator, by... certificate holder, the Administrator allows deviation for a particular extended overwater operation, no...

  6. 14 CFR 121.339 - Emergency equipment for extended over-water operations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Emergency equipment for extended over-water... § 121.339 Emergency equipment for extended over-water operations. (a) Except where the Administrator, by... certificate holder, the Administrator allows deviation for a particular extended overwater operation, no...

  7. 14 CFR 121.339 - Emergency equipment for extended over-water operations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Emergency equipment for extended over-water... § 121.339 Emergency equipment for extended over-water operations. (a) Except where the Administrator, by... certificate holder, the Administrator allows deviation for a particular extended overwater operation, no...

  8. 14 CFR 121.339 - Emergency equipment for extended over-water operations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Emergency equipment for extended over-water... § 121.339 Emergency equipment for extended over-water operations. (a) Except where the Administrator, by... certificate holder, the Administrator allows deviation for a particular extended overwater operation, no...

  9. 14 CFR 121.339 - Emergency equipment for extended over-water operations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Emergency equipment for extended over-water... § 121.339 Emergency equipment for extended over-water operations. (a) Except where the Administrator, by... certificate holder, the Administrator allows deviation for a particular extended overwater operation, no...

  10. Maintenance of Mechanical Equipment in Minnesota Schools, 1968 Survey.

    ERIC Educational Resources Information Center

    Larson, R. E.; Rust, L. W.

    Results of a one-year research program to study maintenance procedures for operating mechanical equipment were based on the determination of--(1) the present condition and level of performance of operating mechanical equipment, (2) the problems encountered by school administrators and custodial engineers pertaining to operating mechanical…

  11. 30 CFR 75.1725 - Machinery and equipment; operation and maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... machinery until the power is off and the machinery is blocked against motion, except where machinery motion... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Machinery and equipment; operation and....1725 Machinery and equipment; operation and maintenance. (a) Mobile and stationary machinery and...

  12. 30 CFR 75.1725 - Machinery and equipment; operation and maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... machinery until the power is off and the machinery is blocked against motion, except where machinery motion... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Machinery and equipment; operation and....1725 Machinery and equipment; operation and maintenance. (a) Mobile and stationary machinery and...

  13. 30 CFR 75.1725 - Machinery and equipment; operation and maintenance.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... machinery until the power is off and the machinery is blocked against motion, except where machinery motion... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Machinery and equipment; operation and....1725 Machinery and equipment; operation and maintenance. (a) Mobile and stationary machinery and...

  14. 30 CFR 75.1725 - Machinery and equipment; operation and maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... machinery until the power is off and the machinery is blocked against motion, except where machinery motion... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Machinery and equipment; operation and....1725 Machinery and equipment; operation and maintenance. (a) Mobile and stationary machinery and...

  15. 30 CFR 75.1725 - Machinery and equipment; operation and maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... machinery until the power is off and the machinery is blocked against motion, except where machinery motion... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Machinery and equipment; operation and....1725 Machinery and equipment; operation and maintenance. (a) Mobile and stationary machinery and...

  16. Combustion driven ammonia generation strategies for passive ammonia SCR system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Toner, Joel G.; Narayanaswamy, Kushal; Szekely, Jr., Gerald A.

    A method for controlling ammonia generation in an exhaust gas feedstream output from an internal combustion engine equipped with an exhaust aftertreatment system including a first aftertreatment device includes executing an ammonia generation cycle to generate ammonia on the first aftertreatment device. A desired air-fuel ratio output from the engine and entering the exhaust aftertreatment system conducive for generating ammonia on the first aftertreatment device is determined. Operation of a selected combination of a plurality of cylinders of the engine is selectively altered to achieve the desired air-fuel ratio entering the exhaust aftertreatment system.

  17. Optimal Design and Operation of Permanent Irrigation Systems

    NASA Astrophysics Data System (ADS)

    Oron, Gideon; Walker, Wynn R.

    1981-01-01

    Solid-set pressurized irrigation system design and operation are studied with optimization techniques to determine the minimum cost distribution system. The principle of the analysis is to divide the irrigation system into subunits in such a manner that the trade-offs among energy, piping, and equipment costs are selected at the minimum cost point. The optimization procedure involves a nonlinear, mixed integer approach capable of achieving a variety of optimal solutions leading to significant conclusions with regard to the design and operation of the system. Factors investigated include field geometry, the effect of the pressure head, consumptive use rates, a smaller flow rate in the pipe system, and outlet (sprinkler or emitter) discharge.

  18. 14 CFR 121.803 - Emergency medical equipment.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Emergency medical equipment. 121.803... REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Emergency Medical Equipment and Training § 121.803 Emergency medical equipment. (a) No person may operate a passenger-carrying airplane under this part unless...

  19. 14 CFR 125.223 - Airborne weather radar equipment requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Airborne weather radar equipment... Equipment Requirements § 125.223 Airborne weather radar equipment requirements. (a) No person may operate an airplane governed by this part in passenger-carrying operations unless approved airborne weather radar...

  20. 14 CFR 125.223 - Airborne weather radar equipment requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Airborne weather radar equipment... Equipment Requirements § 125.223 Airborne weather radar equipment requirements. (a) No person may operate an airplane governed by this part in passenger-carrying operations unless approved airborne weather radar...

  1. 14 CFR 135.175 - Airborne weather radar equipment requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Airborne weather radar equipment... Aircraft and Equipment § 135.175 Airborne weather radar equipment requirements. (a) No person may operate a large, transport category aircraft in passenger-carrying operations unless approved airborne weather...

  2. 14 CFR 135.175 - Airborne weather radar equipment requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Airborne weather radar equipment... Aircraft and Equipment § 135.175 Airborne weather radar equipment requirements. (a) No person may operate a large, transport category aircraft in passenger-carrying operations unless approved airborne weather...

  3. 14 CFR 135.175 - Airborne weather radar equipment requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Airborne weather radar equipment... Aircraft and Equipment § 135.175 Airborne weather radar equipment requirements. (a) No person may operate a large, transport category aircraft in passenger-carrying operations unless approved airborne weather...

  4. 14 CFR 125.223 - Airborne weather radar equipment requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Airborne weather radar equipment... Equipment Requirements § 125.223 Airborne weather radar equipment requirements. (a) No person may operate an airplane governed by this part in passenger-carrying operations unless approved airborne weather radar...

  5. 14 CFR 135.175 - Airborne weather radar equipment requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Airborne weather radar equipment... Aircraft and Equipment § 135.175 Airborne weather radar equipment requirements. (a) No person may operate a large, transport category aircraft in passenger-carrying operations unless approved airborne weather...

  6. 14 CFR 135.175 - Airborne weather radar equipment requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Airborne weather radar equipment... Aircraft and Equipment § 135.175 Airborne weather radar equipment requirements. (a) No person may operate a large, transport category aircraft in passenger-carrying operations unless approved airborne weather...

  7. 14 CFR 125.223 - Airborne weather radar equipment requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Airborne weather radar equipment... Equipment Requirements § 125.223 Airborne weather radar equipment requirements. (a) No person may operate an airplane governed by this part in passenger-carrying operations unless approved airborne weather radar...

  8. 14 CFR 125.223 - Airborne weather radar equipment requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Airborne weather radar equipment... Equipment Requirements § 125.223 Airborne weather radar equipment requirements. (a) No person may operate an airplane governed by this part in passenger-carrying operations unless approved airborne weather radar...

  9. Controllers for Flow-Field Survey Apparatus

    NASA Technical Reports Server (NTRS)

    Ashby George C., JR.; Vaccarelli, M. D.

    1986-01-01

    Control systems of flow-field survey apparatuses of 22-inch (56centimeter) Hypersonic Helium Facility (two-dimensional) and 20-inch (51centimeter) Mach 6 Tunnel (three-dimensional) at Langley Research Center equipped with single-chip microcomputer and single-board microcomputer, respectively, to drive probes at selected speeds and perform other functions automatically. Various modes of operation programed as need arises. Both of these control systems fabricated relatively inexpensively from commercially available stock components.

  10. Omega VLF timing revision 1

    NASA Technical Reports Server (NTRS)

    Swanson, E. R.; Kugel, C. P.

    1972-01-01

    The report specifically discusses time dissemination techniques, including epoch determination, frequency determination, and ambiguity resolution. It also discusses operational considerations including equipment, path selection, and adjustment procedure. epoch (the actual location or timing of periodic events) is shown to be both maintainable and calibratable by the techniques described to better than 3-microsecond accuracy; and frequency (the uniformity of the time scale) to about one part in 10 to the 12th power.

  11. PWR PRELIMINARY DESIGN FOR PL-3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Humphries, G. E.

    1962-02-28

    The pressurized water reactor preliminary design, the preferred design developed under Phase I of the PL-3 contract, is presented. Plant design criteria, summary of plant selection, plant description, reactor and primary system description, thermal and hydraulic analysis, nuclear analysis, control and instrumentatlon description, shielding description, auxiliary systems, power plant equipment, waste dispusal, buildings and tunnels, services, operation and maintenance, logistics, erection, cost information, and a training program outline are given. (auth)

  12. Engineering support for magnetohydrodynamic power plant analysis and design studies

    NASA Technical Reports Server (NTRS)

    Carlson, A. W.; Chait, I. L.; Marchmont, G.; Rogali, R.; Shikar, D.

    1980-01-01

    The major factors which influence the economic engineering selection of stack inlet temperatures in combined cycle MHD powerplants are identified and the range of suitable stack inlet temperatures under typical operating conditions is indicated. Engineering data and cost estimates are provided for four separately fired high temperature air heater (HTAH) system designs for HTAH system thermal capacity levels of 100, 250, 500 and 1000 MWt. An engineering survey of coal drying and pulverizing equipment for MHD powerplant application is presented as well as capital and operating cost estimates for varying degrees of coal pulverization.

  13. External Beam Therapy (EBT)

    MedlinePlus

    ... deliver the daily treatments. top of page What equipment is used? Radiation oncologists use linear accelerators or ... accelerator page top of page Who operates the equipment? The equipment is operated by a radiation therapist, ...

  14. The dynamic improvement methods of energy efficiency and reliability of oil production submersible electric motors

    NASA Astrophysics Data System (ADS)

    Romanov, V. S.; Goldstein, V. G.

    2018-01-01

    In the organization of production and operation of submersible electric motors (ESP), as the most essential element of electric submersible plants (ESP) in the oil industry, it is necessary to consider specific operating conditions. The submersible electric motors (SEM) as most essential element of electrosubmersible installations (EI) in oil branch accounting of operation specific conditions is necessary in the process production and operation. They are determined by the conditions under which the EPU is operated. They are defined by the EPU operation conditions. For a complete picture the current state of the SED fleet in oil production, the results of its statistical analysis are given. For a comprehensive idea of the SEM park current state the results of statistical analysis are given in oil production. Currently, assessed the performance of submersible equipment produced by major manufacturers. Currently the operational characteristics assessment of the submersible equipment released by the main producers is given. It is stated that standard equipment cannot fully ensure efficient operation with the help of serial EIs, therefore new technologies and corresponding equipment are required to be developed. It is noted that the standard equipment could not provide fully effective operation by means of serial ESP therefore new technologies development and the corresponding equipment are required.

  15. 46 CFR 28.405 - Hydraulic equipment.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... than four times the system maximum operating pressure. (c) Each hydraulic system must be equipped with... 46 Shipping 1 2013-10-01 2013-10-01 false Hydraulic equipment. 28.405 Section 28.405 Shipping... Operate With More Than 16 Individuals on Board § 28.405 Hydraulic equipment. (a) Each hydraulic system...

  16. 46 CFR 28.405 - Hydraulic equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... than four times the system maximum operating pressure. (c) Each hydraulic system must be equipped with... 46 Shipping 1 2010-10-01 2010-10-01 false Hydraulic equipment. 28.405 Section 28.405 Shipping... Operate With More Than 16 Individuals on Board § 28.405 Hydraulic equipment. (a) Each hydraulic system...

  17. 46 CFR 28.405 - Hydraulic equipment.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... than four times the system maximum operating pressure. (c) Each hydraulic system must be equipped with... 46 Shipping 1 2014-10-01 2014-10-01 false Hydraulic equipment. 28.405 Section 28.405 Shipping... Operate With More Than 16 Individuals on Board § 28.405 Hydraulic equipment. (a) Each hydraulic system...

  18. 46 CFR 28.405 - Hydraulic equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... than four times the system maximum operating pressure. (c) Each hydraulic system must be equipped with... 46 Shipping 1 2011-10-01 2011-10-01 false Hydraulic equipment. 28.405 Section 28.405 Shipping... Operate With More Than 16 Individuals on Board § 28.405 Hydraulic equipment. (a) Each hydraulic system...

  19. 46 CFR 28.405 - Hydraulic equipment.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... than four times the system maximum operating pressure. (c) Each hydraulic system must be equipped with... 46 Shipping 1 2012-10-01 2012-10-01 false Hydraulic equipment. 28.405 Section 28.405 Shipping... Operate With More Than 16 Individuals on Board § 28.405 Hydraulic equipment. (a) Each hydraulic system...

  20. 30 CFR 75.1914 - Maintenance of diesel-powered equipment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... written standard operating procedures for such testing and evaluation that specify the following: (1) The... MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Diesel-Powered Equipment § 75... the equipment is operated. (d) The intake air filter on diesel-powered equipment shall be replaced or...

  1. 30 CFR 75.1914 - Maintenance of diesel-powered equipment.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... written standard operating procedures for such testing and evaluation that specify the following: (1) The... MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Diesel-Powered Equipment § 75... the equipment is operated. (d) The intake air filter on diesel-powered equipment shall be replaced or...

  2. 30 CFR 75.1914 - Maintenance of diesel-powered equipment.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... written standard operating procedures for such testing and evaluation that specify the following: (1) The... MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Diesel-Powered Equipment § 75... the equipment is operated. (d) The intake air filter on diesel-powered equipment shall be replaced or...

  3. 30 CFR 75.1914 - Maintenance of diesel-powered equipment.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... written standard operating procedures for such testing and evaluation that specify the following: (1) The... MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Diesel-Powered Equipment § 75... the equipment is operated. (d) The intake air filter on diesel-powered equipment shall be replaced or...

  4. 30 CFR 75.1914 - Maintenance of diesel-powered equipment.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... written standard operating procedures for such testing and evaluation that specify the following: (1) The... MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Diesel-Powered Equipment § 75... the equipment is operated. (d) The intake air filter on diesel-powered equipment shall be replaced or...

  5. 29 CFR 1926.952 - Mechanical equipment.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... of each shift during which the equipment is to be used to determine that the brakes and operating systems are in proper working condition. (3) No employer shall use any motor vehicle equipment having an... certified for work on the proper voltage, mechanical equipment shall not be operated closer to any energized...

  6. 29 CFR 1926.952 - Mechanical equipment.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... of each shift during which the equipment is to be used to determine that the brakes and operating systems are in proper working condition. (3) No employer shall use any motor vehicle equipment having an... certified for work on the proper voltage, mechanical equipment shall not be operated closer to any energized...

  7. 49 CFR 1242.46 - Computers and data processing equipment (account XX-27-46).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... REPORTS SEPARATION OF COMMON OPERATING EXPENSES BETWEEN FREIGHT SERVICE AND PASSENGER SERVICE FOR RAILROADS 1 Operating Expenses-Equipment § 1242.46 Computers and data processing equipment (account XX-27-46... 49 Transportation 9 2012-10-01 2012-10-01 false Computers and data processing equipment (account...

  8. 49 CFR 1242.46 - Computers and data processing equipment (account XX-27-46).

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... REPORTS SEPARATION OF COMMON OPERATING EXPENSES BETWEEN FREIGHT SERVICE AND PASSENGER SERVICE FOR RAILROADS 1 Operating Expenses-Equipment § 1242.46 Computers and data processing equipment (account XX-27-46... 49 Transportation 9 2013-10-01 2013-10-01 false Computers and data processing equipment (account...

  9. 49 CFR 1242.46 - Computers and data processing equipment (account XX-27-46).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... REPORTS SEPARATION OF COMMON OPERATING EXPENSES BETWEEN FREIGHT SERVICE AND PASSENGER SERVICE FOR RAILROADS 1 Operating Expenses-Equipment § 1242.46 Computers and data processing equipment (account XX-27-46... 49 Transportation 9 2011-10-01 2011-10-01 false Computers and data processing equipment (account...

  10. 49 CFR 1242.46 - Computers and data processing equipment (account XX-27-46).

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... REPORTS SEPARATION OF COMMON OPERATING EXPENSES BETWEEN FREIGHT SERVICE AND PASSENGER SERVICE FOR RAILROADS 1 Operating Expenses-Equipment § 1242.46 Computers and data processing equipment (account XX-27-46... 49 Transportation 9 2014-10-01 2014-10-01 false Computers and data processing equipment (account...

  11. 49 CFR 1242.46 - Computers and data processing equipment (account XX-27-46).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REPORTS SEPARATION OF COMMON OPERATING EXPENSES BETWEEN FREIGHT SERVICE AND PASSENGER SERVICE FOR RAILROADS 1 Operating Expenses-Equipment § 1242.46 Computers and data processing equipment (account XX-27-46... 49 Transportation 9 2010-10-01 2010-10-01 false Computers and data processing equipment (account...

  12. 40 CFR 63.986 - Nonflare control devices used for equipment leaks only.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... equipment leaks only. 63.986 Section 63.986 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... leaks only. (a) Equipment and operating requirements. (1) Owners or operators using a nonflare control device to meet the applicable requirements of a referencing subpart for equipment leaks shall meet the...

  13. 76 FR 29169 - Requirements for Intermodal Equipment Providers and for Motor Carriers and Drivers Operating...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-20

    ... No. FMCSA-2005-23315] RIN 2126-AB37 Requirements for Intermodal Equipment Providers and for Motor Carriers and Drivers Operating Intermodal Equipment AGENCY: Federal Motor Carrier Safety Administration... driver- vehicle inspection report (DVIR) on an item of intermodal equipment (IME) when no damage, defects...

  14. 30 CFR 77.404 - Machinery and equipment; operation and maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... the power is off and the machinery is blocked against motion, except where machinery motion is... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Machinery and equipment; operation and... OF UNDERGROUND COAL MINES Safeguards for Mechanical Equipment § 77.404 Machinery and equipment...

  15. 30 CFR 77.404 - Machinery and equipment; operation and maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the power is off and the machinery is blocked against motion, except where machinery motion is... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Machinery and equipment; operation and... OF UNDERGROUND COAL MINES Safeguards for Mechanical Equipment § 77.404 Machinery and equipment...

  16. 30 CFR 77.404 - Machinery and equipment; operation and maintenance.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... the power is off and the machinery is blocked against motion, except where machinery motion is... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Machinery and equipment; operation and... OF UNDERGROUND COAL MINES Safeguards for Mechanical Equipment § 77.404 Machinery and equipment...

  17. 30 CFR 77.404 - Machinery and equipment; operation and maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... the power is off and the machinery is blocked against motion, except where machinery motion is... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Machinery and equipment; operation and... OF UNDERGROUND COAL MINES Safeguards for Mechanical Equipment § 77.404 Machinery and equipment...

  18. 30 CFR 77.404 - Machinery and equipment; operation and maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... the power is off and the machinery is blocked against motion, except where machinery motion is... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Machinery and equipment; operation and... OF UNDERGROUND COAL MINES Safeguards for Mechanical Equipment § 77.404 Machinery and equipment...

  19. Complex of technologies and prototype systems for eco-friendly shutdown of the power-generating, process, capacitive, and transport equipment

    NASA Astrophysics Data System (ADS)

    Smorodin, A. I.; Red'kin, V. V.; Frolov, Y. D.; Korobkov, A. A.; Kemaev, O. V.; Kulik, M. V.; Shabalin, O. V.

    2015-07-01

    A set of technologies and prototype systems for eco-friendly shutdown of the power-generating, process, capacitive, and transport equipment is offered. The following technologies are regarded as core technologies for the complex: cryogenic technology nitrogen for displacement of hydrogen from the cooling circuit of turbine generators, cryo blasting of the power units by dioxide granules, preservation of the shutdown power units by dehydrated air, and dismantling and severing of equipment and structural materials of power units. Four prototype systems for eco-friendly shutdown of the power units may be built on the basis of selected technologies: Multimode nitrogen cryogenic system with four subsystems, cryo blasting system with CO2 granules for thermal-mechanical and electrical equipment of power units, and compressionless air-drainage systems for drying and storage of the shutdown power units and cryo-gas system for general severing of the steam-turbine power units. Results of the research and pilot and demonstration tests of the operational units of the considered technological systems allow applying the proposed technologies and systems in the prototype systems for shutdown of the power-generating, process, capacitive, and transport equipment.

  20. [Interface interconnection and data integration in implementing of digital operating room].

    PubMed

    Feng, Jingyi; Chen, Hua; Liu, Jiquan

    2011-10-01

    The digital operating-room, with highly integrated clinical information, is very important for rescuing lives of patients and improving quality of operations. Since equipments in domestic operating-rooms have diversified interface and nonstandard communication protocols, designing and implementing an integrated data sharing program for different kinds of diagnosing, monitoring, and treatment equipments become a key point in construction of digital operating room. This paper addresses interface interconnection and data integration for commonly used clinical equipments from aspects of hardware interface, interface connection and communication protocol, and offers a solution for interconnection and integration of clinical equipments in heterogeneous environment. Based on the solution, a case of an optimal digital operating-room is presented in this paper. Comparing with the international solution for digital operating-room, the solution proposed in this paper is more economical and effective. And finally, this paper provides a proposal for the platform construction of digital perating-room as well as a viewpoint for standardization of domestic clinical equipments.

  1. Equipment Operator 3 and 2. NAVTRA 10640-G. Rate Training Manual.

    ERIC Educational Resources Information Center

    Bureau of Naval Personnel, Washington, DC.

    A guide for advancement and training in the Equipment Operator 3 and 2 ratings for Navy personnel is provided in this manual. The chapters outline the duties and responsibilities of the equipment operators involved with engines, fuels, lubricants, pollution control, automotive power trains and chassis, automotive vehicles, materials-handling…

  2. 30 CFR 56.12071 - Movement or operation of equipment near high-voltage power lines.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...-voltage power lines. 56.12071 Section 56.12071 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... NONMETAL MINES Electricity § 56.12071 Movement or operation of equipment near high-voltage power lines. When equipment must be moved or operated near energized high-voltage powerlines (other than trolley...

  3. 30 CFR 57.12071 - Movement or operation of equipment near high-voltage powerlines.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Movement or operation of equipment near high-voltage powerlines. 57.12071 Section 57.12071 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION...-voltage powerlines. When equipment must be moved or operated near energized high-voltage powerlines (other...

  4. 40 CFR 65.3 - Compliance with standards and operation and maintenance requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...)(4)(i) and (ii) do not apply to Group 2A or Group 2B process vents. Compliance with design, equipment, work practice, and operational standards, including those for equipment leaks, shall be determined... this part. (5) Design, equipment, work practice, or operational standards. Paragraphs (b)(5)(i) and (ii...

  5. Interactive color-graphics interface for energy-monitoring and -control systems. Final report, October 1979-September 1983

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Canfield, K.J.

    1984-05-01

    An EMCS (Energy Monitoring and Control System) can be described as a system that automatically takes care of routine operation of equipment and provides centralized reporting and override capabilities. Equipment controlled by an EMCS would be heating, ventilating, and air conditioning (HVAC) equipment, air compressors, and small package boiler units. The EMCS would obtain raw information (data) from sensors associated with the equipment and massage the data into useful information. The information obtained from the sensors plus additional information available to the EMCS would be used to control the equipment. The information would also be available to the operator inmore » the form of reports or in response to operator commands for specific information. EMCS are computerized systems that control and monitor energy consuming and producing equipment at Naval facilities. The larger systems have been installed with color-graphics cathode ray tube operator consoles to provide better information to the personnel operating these systems. This report summarizes the work done on defining an adequate operator console and recommends changes to the existing EMCS Guide Specifications.« less

  6. Medical technology management: from planning to application.

    PubMed

    David, Y; Jahnke, E

    2005-01-01

    Appropriate deployment of technological innovation contributes to improvement in the quality of healthcare delivered, the containment of cost, and access to the healthcare system. Hospitals have been allocating a significant portion of their resources to procuring and managing capital assets; they are continuously faced with demands for new medical equipment and are asked to manage existing inventory for which they are not well prepared. To objectively manage their investment, hospitals are developing medical technology management programs that need pertinent information and planning methodology for integrating new equipment into existing operations as well as for optimizing costs of ownership of all equipment. Clinical engineers can identify technological solutions based on the matching of new medical equipment with hospital's objectives. They can review their institution's overall technological position, determine strengths and weaknesses, develop equipment-selection criteria, supervise installations, train users and monitor post procurement performance to assure meeting of goals. This program, together with cost accounting analysis, will objectively guide the capital assets decision-making process. Cost accounting analysis is a multivariate function that includes determining the amount, based upon a strategic plan and financial resources, of funding to be allocated annually for medical equipment acquisition and replacement. Often this function works closely with clinical engineering to establish equipment useful life and prioritization of acquisition, upgrade, and replacement of inventory within budget confines and without conducting time consuming, individual financial capital project evaluations.

  7. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Silva, R.A.; Cron, J.

    This design analysis has shown that, on a conceptual level, the emplacement of drip shields is feasible with current technology and equipment. A plan for drip shield emplacement was presented using a Drip Shield Transporter, a Drip Shield Emplacement Gantry, a locomotive, and a Drip Shield Gantry Carrier. The use of a Drip Shield Emplacement Gantry as an emplacement concept results in a system that is simple, reliable, and interfaces with the numerous other exising repository systems. Using the Waste Emplacement/Retrieval System design as a basis for the drip shield emplacement concept proved to simplify the system by using existingmore » equipment, such as the gantry carrier, locomotive, Electrical and Control systems, and many other systems, structures, and components. Restricted working envelopes for the Drip Shield Emplacement System require further consideration and must be addressed to show that the emplacement operations can be performed as the repository design evolves. Section 6.1 describes how the Drip Shield Emplacement System may use existing equipment. Depending on the length of time between the conclusion of waste emplacement and the commencement of drip shield emplacement, this equipment could include the locomotives, the gantry carrier, and the electrical, control, and rail systems. If the exisiting equipment is selected for use in the Drip Shield Emplacement System, then the length of time after the final stages of waste emplacement and start of drip shield emplacement may pose a concern for the life cycle of the system (e.g., reliability, maintainability, availability, etc.). Further investigation should be performed to consider the use of existing equipment for drip shield emplacement operations. Further investigation will also be needed regarding the interfaces and heat transfer and thermal effects aspects. The conceptual design also requires further design development. Although the findings of this analysis are accurate for the assumptions made, further refinements of this analysis are needed as the project parameters change. The designs of the drip shield, the Emplacement Drift, and the other drip shield emplacement equipment all have a direct effect on the overall design feasibility.« less

  8. Point-of-entry drinking-water treatment systems for Superfund applications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chambers, C.D.; Janszen, T.A.

    1989-06-01

    The U.S. Environmental Protection Agency (EPA) and State Superfund agencies need a technical manual to assist their personnel in the selection of an effective drinking-water treatment system for individual households in areas where the drinking water has been adversely affected by Superfund site contaminants and no other alternative water supply is available or feasible. Commercially available water treatment systems for individual households are of two basic types: point-of-use (POU) and point-of-entry (POE). A POU device consists of equipment applied to selected water taps to reduce contaminants at each tap. A POE device consists of equipment to reduce the contaminants inmore » the water distributed throughout the entire structure of a house. The study was initiated to collect monitoring, operation and maintenance, performance, and design data on existing Superfund POE water-treatment systems. Evaluation of the collected data showed that the existing data are not sufficient for the preparation of a technical assistance document to meet the objectives of EPA and State Superfund personnel.« less

  9. Growth and characterization of III-V epitaxial films

    NASA Astrophysics Data System (ADS)

    Tripathi, A.; Adamski, J.

    1991-11-01

    Investigations were conducted on the growth of epitaxial layers using an Organo Metallic Chemical Vapor Deposition technique of selected III-V materials which are potentially useful for photonics and microwave devices. RL/ERX's MOCVD machine was leak checked for safety. The whole gas handling plumbing system has been leak checked and the problems were reported to the manufacturer, CVD Equipment Corporation of Dear Park, NY. CVD Equipment Corporation is making an effort to correct these problems and also supply the part according to our redesign specifications. One of the main emphasis during this contract period was understanding the operating procedure and writing an operating manual for this MOCVD machine. To study the dynamic fluid flow in the vertical reactor of this MOCVD machine, an experimental apparatus was designed, tested, and put together. This study gave very important information on the turbulent gas flow patterns in this vertical reactor. The turbulent flow affects the epitaxial growth adversely. This study will also help in redesigning a vertical reactor so that the turbulent gas flow can be eliminated.

  10. Heavy equipment maintenance wastes and environmental management in the mining industry.

    PubMed

    Guerin, Turlough F

    2002-10-01

    Maintenance wastes, if not managed properly, represent significant environmental issues for mining operations. Petroleum hydrocarbon liquid wastes were studied at an Australian site and a review of the literature and technology vendors was carried out to identify oil/water separation technologies. Treatment technologies and practices for managing oily wastewater, used across the broader mining industry in the Asia-Pacific region, were also identified. Key findings from the study were: (1) primary treatment is required to remove grease oil contamination and to protect secondary oily wastewater treatment systems from being overloaded; (2) selection of an effective secondary treatment system is dependent on influent oil droplet size and concentration, suspended solids concentration, flow rates (and their variability), environmental conditions, maintenance schedules and effectiveness, treatment targets and costs; and (3) oily wastewater treatment systems, based on mechanical separation, are favoured over those that are chemically based, as they simplify operational requirements. Source reduction, through housekeeping, equipment and reagent modifications, and segregation and/or consolidation of hydrocarbon waste streams, minimizes treatment costs, safety and environmental impact.

  11. 49 CFR 605.12 - Use of project equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., facilities or equipment funded under the Acts. A grantee or operator may, however, use such buses, facilities... 49 Transportation 7 2010-10-01 2010-10-01 false Use of project equipment. 605.12 Section 605.12..., DEPARTMENT OF TRANSPORTATION SCHOOL BUS OPERATIONS School Bus Agreements § 605.12 Use of project equipment...

  12. 7 CFR 501.11 - Mobile equipment and pedestrian traffic.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Mobile equipment and pedestrian traffic. 501.11... § 501.11 Mobile equipment and pedestrian traffic. (a) Drivers, operators, or pilots of all equipment... activity, shall operate in a careful and safe manner at all times and shall comply with the signals and...

  13. 29 CFR 1926.952 - Mechanical equipment.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... of each shift during which the equipment is to be used to determine that the brakes and operating systems are in proper working condition. (3) No employer shall use any motor vehicle equipment having an... shall not be operated closer to any energized line or equipment than the clearances set forth in § 1926...

  14. 30 CFR 75.503-1 - Statement listing all electric face equipment.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Statement listing all electric face equipment...-General § 75.503-1 Statement listing all electric face equipment. Each operator of a coal mine shall... Electrical Survey” and Form 6-1496 Supplemental entitled “Operator's Survey of Electrical Face Equipment...

  15. 30 CFR 75.503-1 - Statement listing all electric face equipment.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Statement listing all electric face equipment...-General § 75.503-1 Statement listing all electric face equipment. Each operator of a coal mine shall... Electrical Survey” and Form 6-1496 Supplemental entitled “Operator's Survey of Electrical Face Equipment...

  16. 30 CFR 75.503-1 - Statement listing all electric face equipment.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Statement listing all electric face equipment...-General § 75.503-1 Statement listing all electric face equipment. Each operator of a coal mine shall... Electrical Survey” and Form 6-1496 Supplemental entitled “Operator's Survey of Electrical Face Equipment...

  17. 30 CFR 75.503-1 - Statement listing all electric face equipment.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Statement listing all electric face equipment...-General § 75.503-1 Statement listing all electric face equipment. Each operator of a coal mine shall... Electrical Survey” and Form 6-1496 Supplemental entitled “Operator's Survey of Electrical Face Equipment...

  18. 7 CFR 1400.104 - Changes in farming operations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    .... (4) A change in ownership by sale or gift of equipment from a person or legal entity previously.... The sale or gift of equipment will be considered to be bona fide and substantive only if: (i) The... farming operation, (ii) The sale or gift of the equipment was based on the equipment's fair market value...

  19. 40 CFR 60.5402 - What are the alternative emission limitations for equipment leaks from onshore natural gas...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., Transmission and Distribution § 60.5402 What are the alternative emission limitations for equipment leaks from... emissions achieved under any design, equipment, work practice or operational standard, the Administrator... to the reduction in VOC emissions achieved under the design, equipment, work practice or operational...

  20. 40 CFR 60.5402 - What are the alternative emission limitations for equipment leaks from onshore natural gas...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., Transmission and Distribution § 60.5402 What are the alternative emission limitations for equipment leaks from... emissions achieved under any design, equipment, work practice or operational standard, the Administrator... to the reduction in VOC emissions achieved under the design, equipment, work practice or operational...

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bryngelson, R.H.

    Describes installation of 3 satellite subsea trees in 500 ft of water from a semisubmersible drilling rig. These wet, diver-assist trees are part of Phillips Petroleum's early development and production program (EDPP) for the Espoir field offshore Ivory Coast, with plans calling for 5 satellite wells with downhole completion equipment and subsea production trees. Diagram shows how a converted jackup, Dan Duke, supports equipment to handle production from subsea wells. Table gives time breakdown of subsea tree installation. Before mobilizing the subsea trees, control system, and tubulars to the rig, a study of deck layout, payloads, and traffic patterns wasmore » performed. Concludes that, based on experience in this project and the cost differences between purchase and installation costs, final success is 90% dependent on informed and trained field personnel after engineering, design, and manufacturing; attention to installation procedures and training of field and operational personnel are as critical or more critical than design changes to equipment; and selection of a supplier for high technology equipment, based on a low bid alone, may not translate into lower installation costs.« less

  2. Design of an EEG-based brain-computer interface (BCI) from standard components running in real-time under Windows.

    PubMed

    Guger, C; Schlögl, A; Walterspacher, D; Pfurtscheller, G

    1999-01-01

    An EEG-based brain-computer interface (BCI) is a direct connection between the human brain and the computer. Such a communication system is needed by patients with severe motor impairments (e.g. late stage of Amyotrophic Lateral Sclerosis) and has to operate in real-time. This paper describes the selection of the appropriate components to construct such a BCI and focuses also on the selection of a suitable programming language and operating system. The multichannel system runs under Windows 95, equipped with a real-time Kernel expansion to obtain reasonable real-time operations on a standard PC. Matlab controls the data acquisition and the presentation of the experimental paradigm, while Simulink is used to calculate the recursive least square (RLS) algorithm that describes the current state of the EEG in real-time. First results of the new low-cost BCI show that the accuracy of differentiating imagination of left and right hand movement is around 95%.

  3. United States Air Force Analysis Extract AFSC 2A6X4 Aircraft Fuel Systems (Active Duty)

    DTIC Science & Technology

    2001-02-01

    8217AFOMS (AETC) Randolph AFB TX’ V0226 Spec tools/equip use/oper - Rollers or Stitchers ACTIVE...8217AFOMS (AETC) Randolph AFB TX’ V0226 Spec tools/equip use/oper - Rollers or Stitchers ...equip use/oper - Rollers or Stitchers USAFE AETC PACAF AFSOC ACC AMC AFMC

  4. United States Air Force Analysis Extract AFSC 2A6X4 Aircraft Fuel Systems (ANG/AFRC)

    DTIC Science & Technology

    2001-02-01

    8217AFOMS (AETC) Randolph AFB TX’ V0226 Spec tools/equip use/oper - Rollers or Stitchers ...8217 V0226 Spec tools/equip use/oper - Rollers or Stitchers ANG ANG ANG RES RES...8217AFOMS (AETC) Randolph AFB TX’ V0226 Spec tools/equip use/oper - Rollers or Stitchers

  5. Development of Army Facility Functionality Assessment Criteria and Procedures

    DTIC Science & Technology

    2010-09-01

    critical facility types: the Tactical Equipment Main- tenance Facility (TEMF), the Company Operations Facility (COF), the Bat- talion Headquarters...Criteria for Company Operations Facilities (COF) ................ 56 Appendix G: Army Standard Design Criteria for Tactical Equipment Maintenance...1 mission-critical facility types: the Tactical Equipment Mainten- ance Facility (TEMF), the Company Operations Facility (COF), the Batta- lion

  6. Evaluation of fuel equipment operability of diesel locomotive engine with use of infrared receivers

    NASA Astrophysics Data System (ADS)

    Ovcharenko, S. M.; Balagin, O. V.; Balagin, D. V.

    2018-03-01

    This paper provides results of modelling the heat liberation in high-pressure pipeline of fuel equipment of diesel locomotive engines. Functional relationships between the technical state of fuel equipment and temperature of the outer surface of the high-pressure fuel pipeline are presented using the example of diesel locomotive engine 1-PD4D. The paper shows results of operational tests of the developed method for control of fuel equipment operability of diesel locomotive.

  7. Predicate Argument Structure Frames for Modeling Information in Operative Notes

    PubMed Central

    Wang, Yan; Pakhomov, Serguei; Melton, Genevieve B.

    2015-01-01

    The rich information about surgical procedures contained in operative notes is a valuable data source for improving the clinical evidence base and clinical research. In this study, we propose a set of Predicate Argument Structure (PAS) frames for surgical action verbs to assist in the creation of an information extraction (IE) system to automatically extract details about the techniques, equipment, and operative steps from operative notes. We created PropBank style PAS frames for the 30 top surgical action verbs based on examination of randomly selected sample sentences from 3,000 Laparoscopic Cholecystectomy notes. To assess completeness of the PAS frames to represent usage of same action verbs, we evaluated the PAS frames created on sample sentences from operative notes of 6 other gastrointestinal surgical procedures. Our results showed that the PAS frames created with one type of surgery can successfully denote the usage of the same verbs in operative notes of broader surgical categories. PMID:23920664

  8. Market Survey: Biological Detectors. Guide for Selection of Detection Devices and Systems

    DTIC Science & Technology

    2006-02-01

    samples. There are no real concerns with logistical or operational concerns, as issues such as size, weight, signature, transportation , additional equipment...of the detection system or device on support and logistical systems. 2.1 Transportation Measure. Ability to transport the detection system or device...supplied, such as water, fuel, batteries, chemical, power, etc.) that have to be transported to the site for detection. 100 0-1 consumable or

  9. Hand tools: A compilation

    NASA Technical Reports Server (NTRS)

    1972-01-01

    A selection of new hand tools, modifications of existing tools, and techniques developed in the course of NASA research and development projects are presented. The items are presented in two sections: tools for cable and connector applications, and tools for welding applications. Safety is emphasized, together with ease of operation and use in restricted areas or hazardous environments. The discussions are directed primarily toward the technician engaged in assembly or maintenance of mechanical or electrical equipment.

  10. Construction equipment and motor vehicle related injuries on construction sites in Turkey.

    PubMed

    Gürcanli, G Emre; Müngen, Ugur; Akad, Murat

    2008-08-01

    Research on occupational accidents on construction sites in Turkey is very few. Moreover, research on motor vehicle and equipment accidents also do not exist. Investigation in the scope of this study shows that after falls and contact with electricity, accidents involving heavy equipment and motor vehicles rank third and fourth, respectively. This study aims to reveal the characteristics of these types of accidents, deduct the prominent causes that lead to fatalities as well as permanent disabilities using the present data. With the aid of obtained results, recommendations are made for safety experts on how to derive data from insufficient sources in Turkey and to evaluate these data for prevention and mitigation of the risks that construction workers are exposed to. 168 fatal and 38 non-fatal traffic accident-caused incidents as well as 206 fatal and 97 non-fatal construction equipment accidents, which were selected from official statistics and expert reports, were taken into consideration. Analysis and classification of these accidents were done according to the way they happened, the type of construction site and the occupation of the victims. Moreover, the leading causes of fatal and non-fatal injuries, to which drivers, operators and co-operators are exposed, are presented. Critical findings concerning prominent ways of occurrence, type of construction work and occupation are presented; and a number of measures for reducing the present risks are suggested. Some approaches for analysing relevant data are proposed for further research.

  11. 46 CFR 232.5 - Income Statement Accounts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... as terminal operations, cargo equipment, fleet operations, cargo pooling agreements, container... revenue from pooling agreements, terminal services provided to others, and cargo handling services performed for others; cargo equipment rentals, and repairs to cargo equipment belonging to others; agency...

  12. 46 CFR 232.5 - Income Statement Accounts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... as terminal operations, cargo equipment, fleet operations, cargo pooling agreements, container... revenue from pooling agreements, terminal services provided to others, and cargo handling services performed for others; cargo equipment rentals, and repairs to cargo equipment belonging to others; agency...

  13. 46 CFR 232.5 - Income Statement Accounts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... as terminal operations, cargo equipment, fleet operations, cargo pooling agreements, container... revenue from pooling agreements, terminal services provided to others, and cargo handling services performed for others; cargo equipment rentals, and repairs to cargo equipment belonging to others; agency...

  14. 46 CFR 232.5 - Income Statement Accounts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... as terminal operations, cargo equipment, fleet operations, cargo pooling agreements, container... revenue from pooling agreements, terminal services provided to others, and cargo handling services performed for others; cargo equipment rentals, and repairs to cargo equipment belonging to others; agency...

  15. 33 CFR 150.608 - Who is responsible for ensuring that the personnel use or wear protective equipment and are...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... DEEPWATER PORTS: OPERATIONS Workplace Safety and Health Personal Protective Equipment § 150.608 Who is...) Each deepwater port operator must ensure that all personnel wear personal protective equipment when... that the personnel use or wear protective equipment and are trained in its use? 150.608 Section 150.608...

  16. 33 CFR 150.608 - Who is responsible for ensuring that the personnel use or wear protective equipment and are...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... DEEPWATER PORTS: OPERATIONS Workplace Safety and Health Personal Protective Equipment § 150.608 Who is...) Each deepwater port operator must ensure that all personnel wear personal protective equipment when... that the personnel use or wear protective equipment and are trained in its use? 150.608 Section 150.608...

  17. Survey of dental radiographic services in private dental clinics in Damascus, Syria.

    PubMed

    Salti, L; Whaites, E J

    2002-03-01

    To perform a radiographic survey of private dental clinics in Damascus, Syria using a postal questionnaire to produce recommendations for improving the quality of dental radiographic services and education in Syria. Three hundred private dental clinics in Damascus were surveyed using a postal questionnaire (in English and Arabic) containing 27 questions on demographic information, equipment, techniques, selection criteria, frequency of examinations, and undergraduate/ postgraduate education. Two hundred and two (67%) dentists responded of which 95% graduated in Syria. The results showed a general lack of knowledge and understanding of dental radiography. Sixty four per cent did not know the kVp setting of their equipment, 73% used D-speed film, 57% did not use film holders and beam aiming devices, 25% did not use a viewing box. In addition, 45% of known equipment operated at 50 kVp or less and 16% was over 20 years old. No meaningful selection criteria existed with a wide variation in type and frequency of radiographs used for different clinical conditions. Syrian undergraduate training in dental radiology was minimal and there was no postgraduate education in the speciality. Several areas of the radiographic service in Damascus fall short of current recommendations on good practice. Recommendations are made to improve the service, the quality of undergraduate education and to establish postgraduate education.

  18. Borehole geophysics applied to ground-water investigations

    USGS Publications Warehouse

    Keys, W.S.

    1990-01-01

    The purpose of this manual is to provide hydrologists, geologists, and others who have the necessary background in hydrogeology with the basic information needed to apply the most useful borehole-geophysical-logging techniques to the solution of problems in ground-water hydrology. Geophysical logs can provide information on the construction of wells and on the character of the rocks and fluids penetrated by those wells, as well as on changes in the character of these factors over time. The response of well logs is caused by petrophysical factors, by the quality, temperature, and pressure of interstitial fluids, and by ground-water flow. Qualitative and quantitative analysis of analog records and computer analysis of digitized logs are used to derive geohydrologic information. This information can then be extrapolated vertically within a well and laterally to other wells using logs. The physical principles by which the mechanical and electronic components of a logging system measure properties of rocks, fluids, and wells, as well as the principles of measurement, must be understood if geophysical logs are to be interpreted correctly. Plating a logging operation involves selecting the equipment and the logs most likely to provide the needed information. Information on well construction and geohydrology is needed to guide this selection. Quality control of logs is an important responsibility of both the equipment operator and the log analyst and requires both calibration and well-site standardization of equipment. Logging techniques that are widely used in ground-water hydrology or that have significant potential for application to this field include spontaneous potential, resistance, resistivity, gamma, gamma spectrometry, gamma-gamma, neutron, acoustic velocity, acoustic televiewer, caliper, and fluid temperature, conductivity, and flow. The following topics are discussed for each of these techniques: principles and instrumentation, calibration and standardization, volume of investigation, extraneous effects, and interpretation and applications.

  19. Borehole geophysics applied to ground-water investigations

    USGS Publications Warehouse

    Keys, W.S.

    1988-01-01

    The purpose of this manual is to provide hydrologists, geologists, and others who have the necessary training with the basic information needed to apply the most useful borehole-geophysical-logging techniques to the solution of problems in ground-water hydrology. Geophysical logs can provide information on the construction of wells and on the character of the rocks and fluids penetrated by those wells, in addition to changes in the character of these factors with time. The response of well logs is caused by: petrophysical factors; the quality; temperature, and pressure of interstitial fluids; and ground-water flow. Qualitative and quantitative analysis of the analog records and computer analysis of digitized logs are used to derive geohydrologic information. This information can then be extrapolated vertically within a well and laterally to other wells using logs.The physical principles by which the mechanical and electronic components of a logging system measure properties of rocks, fluids and wells, and the principles of measurement need to be understood to correctly interpret geophysical logs. Planning the logging operation involves selecting the equipment and the logs most likely to provide the needed information. Information on well construction and geohydrology are needed to guide this selection. Quality control of logs is an important responsibility of both the equipment operator and log analyst and requires both calibration and well-site standardization of equipment.Logging techniques that are widely used in ground-water hydrology or that have significant potential for application to this field include: spontaneous potential, resistance, resistivity, gamma, gamma spectrometry, gamma-gamma, neutron, acoustic velocity, acoustic televiewer, caliper, and fluid temperature, conductivity, and flow. The following topics are discussed for each of these techniques: principles and instrumentation, calibration and standardization, volume of investigation, extraneous effects, and interpretation and applications.

  20. Reliability/maintainability/testability design for dormancy

    NASA Astrophysics Data System (ADS)

    Seman, Robert M.; Etzl, Julius M.; Purnell, Arthur W.

    1988-05-01

    This document has been prepared as a tool for designers of dormant military equipment and systems. The purpose of this handbook is to provide design engineers with Reliability/Maintainability/Testability design guidelines for systems which spend significant portions of their life cycle in a dormant state. The dormant state is defined as a nonoperating mode where a system experiences very little or no electrical stress. The guidelines in this report present design criteria in the following categories: (1) Part Selection and Control; (2) Derating Practices; (3) Equipment/System Packaging; (4) Transportation and Handling; (5) Maintainability Design; (6) Testability Design; (7) Evaluation Methods for In-Plant and Field Evaluation; and (8) Product Performance Agreements. Whereever applicable, design guidelines for operating systems were included with the dormant design guidelines. This was done in an effort to produce design guidelines for a more complete life cycle. Although dormant systems spend significant portions of their life cycle in a nonoperating mode, the designer must design the system for the complete life cycle, including nonoperating as well as operating modes. The guidelines are primarily intended for use in the design of equipment composed of electronic parts and components. However, they can also be used for the design of systems which encompass both electronic and nonelectronic parts, as well as for the modification of existing systems.

  1. Feasibility of high recovery highwall mining equipment. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1981-01-01

    Three equipment systems exhibited significant promise: the RSV Miner, a surface longwall using standard underground equipment, and the variable angle auger. Other equipment systems showing considerable merit were the surface shortwall, and the two extended depth augers. Of the three most significant systems, the RSV Miner exhibits the greatest versatility and adaptability. It may be used competently in many surface mining applications and readily adapts to geologic anomalies and changing seam heights. The machine employs steering and guidance equipment and provides the necessary capabilities for extended depth operation. Safety is good, as no men are required to work underground. However,more » most important is the system's recovery factor of approximately 75% to 80% of the in-situ coal reserve within reach. The surface longwall system using standard underground equipment (preferably a ranging drum shearer in conjunction with shield supports) is most suited to either a trench mining or a modified area mining application. Both applications would allow the length of the face to be held constant. Another important consideration is legal requirements for a tailgate entry, which would necessitate additional equipment for development in a modified area mining application. When compared to surface shortwall, surface longwall exhibits higher productivity, a far greater equipment selection which allows system tailoring to geologic conditions, and greater roof control due to the significantly smaller section of overburden that must be supported. Recovery should approach, and possibly exceed, 90% of the coal in-place. The variable angle auger, which is currently only a concept, fills a very real need for which no other equipment is available at this time.« less

  2. Waste separation and pretreatment using crystalline silicotitanate ion exchangers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tadros, M.E.; Miller, J.E.; Anthony, R.G.

    1997-10-01

    A new class of inorganic ion exchangers called crystalline silicotitanates (CSTs) has been developed jointly by Sandia National Laboratories and Texas A&M University to selectively remove Cs and other radionuclides from a wide spectrum of radioactive defense wastes. The CST exhibits high selectivity and affinity for Cs and Sr under a wide range of conditions. Tests show it can remove part-per-million concentrations of Cs{sup +} from highly alkaline, high-sodium simulated radioactive waste solutions modeled after those at Hanford, Oak Ridge, and Savannah River. The materials exhibit ion exchange properties based on ionic size selectivity. Specifically, crystalline lattice spacing is controlledmore » to be highly selective for Cs ions even in waste streams containing very high (5 to 10 M) concentrations of sodium. The CST technology is being demonstrated with actual waste at several DOE facilities. The use of inorganic ion exchangers. The inorganics are more resistant to chemical, thermal, and radiation degradation. Their high selectivities result in more efficient operations offering the possibility of a simple single-pass operation. In contrast, regenerable organic ion exchangers require additional processing equipment to handle the regeneration liquids and the eluant with the dissolved Cs.« less

  3. 29 CFR 1926.1408 - Power line safety (up to 350 kV)-equipment operations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 8 2013-07-01 2013-07-01 false Power line safety (up to 350 kV)-equipment operations. 1926... Derricks in Construction § 1926.1408 Power line safety (up to 350 kV)—equipment operations. (a) Hazard... for use and conditions of use. Table A—Minimum Clearance Distances Voltage(nominal, kV, alternating...

  4. 29 CFR 1926.1408 - Power line safety (up to 350 kV)-equipment operations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 8 2012-07-01 2012-07-01 false Power line safety (up to 350 kV)-equipment operations. 1926... Derricks in Construction § 1926.1408 Power line safety (up to 350 kV)—equipment operations. (a) Hazard... for use and conditions of use. Table A—Minimum Clearance Distances Voltage(nominal, kV, alternating...

  5. 29 CFR 1926.1408 - Power line safety (up to 350 kV)-equipment operations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 8 2014-07-01 2014-07-01 false Power line safety (up to 350 kV)-equipment operations. 1926... Derricks in Construction § 1926.1408 Power line safety (up to 350 kV)—equipment operations. (a) Hazard... for use and conditions of use. Table A—Minimum Clearance Distances Voltage(nominal, kV, alternating...

  6. 29 CFR 1926.1408 - Power line safety (up to 350 kV)-equipment operations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 8 2011-07-01 2011-07-01 false Power line safety (up to 350 kV)-equipment operations. 1926... Derricks in Construction § 1926.1408 Power line safety (up to 350 kV)—equipment operations. (a) Hazard... for use and conditions of use. Table A—Minimum Clearance Distances Voltage(nominal, kV, alternating...

  7. Functionality and operation of fluoroscopic automatic brightness control/automatic dose rate control logic in modern cardiovascular and interventional angiography systems: A Report of Task Group 125 Radiography/Fluoroscopy Subcommittee, Imaging Physics Committee, Science Council

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rauch, Phillip; Lin, Pei-Jan Paul; Balter, Stephen

    2012-05-15

    Task Group 125 (TG 125) was charged with investigating the functionality of fluoroscopic automatic dose rate and image quality control logic in modern angiographic systems, paying specific attention to the spectral shaping filters and variations in the selected radiologic imaging parameters. The task group was also charged with describing the operational aspects of the imaging equipment for the purpose of assisting the clinical medical physicist with clinical set-up and performance evaluation. Although there are clear distinctions between the fluoroscopic operation of an angiographic system and its acquisition modes (digital cine, digital angiography, digital subtraction angiography, etc.), the scope of thismore » work was limited to the fluoroscopic operation of the systems studied. The use of spectral shaping filters in cardiovascular and interventional angiography equipment has been shown to reduce patient dose. If the imaging control algorithm were programmed to work in conjunction with the selected spectral filter, and if the generator parameters were optimized for the selected filter, then image quality could also be improved. Although assessment of image quality was not included as part of this report, it was recognized that for fluoroscopic imaging the parameters that influence radiation output, differential absorption, and patient dose are also the same parameters that influence image quality. Therefore, this report will utilize the terminology ''automatic dose rate and image quality'' (ADRIQ) when describing the control logic in modern interventional angiographic systems and, where relevant, will describe the influence of controlled parameters on the subsequent image quality. A total of 22 angiography units were investigated by the task group and of these one each was chosen as representative of the equipment manufactured by GE Healthcare, Philips Medical Systems, Shimadzu Medical USA, and Siemens Medical Systems. All equipment, for which measurement data were included in this report, was manufactured within the three year period from 2006 to 2008. Using polymethylmethacrylate (PMMA) plastic to simulate patient attenuation, each angiographic imaging system was evaluated by recording the following parameters: tube potential in units of kilovolts peak (kVp), tube current in units of milliamperes (mA), pulse width (PW) in units of milliseconds (ms), spectral filtration setting, and patient air kerma rate (PAKR) as a function of the attenuator thickness. Data were graphically plotted to reveal the manner in which the ADRIQ control logic responded to changes in object attenuation. There were similarities in the manner in which the ADRIQ control logic operated that allowed the four chosen devices to be divided into two groups, with two of the systems in each group. There were also unique approaches to the ADRIQ control logic that were associated with some of the systems, and these are described in the report. The evaluation revealed relevant information about the testing procedure and also about the manner in which different manufacturers approach the utilization of spectral filtration, pulsed fluoroscopy, and maximum PAKR limitation. This information should be particularly valuable to the clinical medical physicist charged with acceptance testing and performance evaluation of modern angiographic systems.« less

  8. Functionality and operation of fluoroscopic automatic brightness control/automatic dose rate control logic in modern cardiovascular and interventional angiography systems: a report of Task Group 125 Radiography/Fluoroscopy Subcommittee, Imaging Physics Committee, Science Council.

    PubMed

    Rauch, Phillip; Lin, Pei-Jan Paul; Balter, Stephen; Fukuda, Atsushi; Goode, Allen; Hartwell, Gary; LaFrance, Terry; Nickoloff, Edward; Shepard, Jeff; Strauss, Keith

    2012-05-01

    Task Group 125 (TG 125) was charged with investigating the functionality of fluoroscopic automatic dose rate and image quality control logic in modern angiographic systems, paying specific attention to the spectral shaping filters and variations in the selected radiologic imaging parameters. The task group was also charged with describing the operational aspects of the imaging equipment for the purpose of assisting the clinical medical physicist with clinical set-up and performance evaluation. Although there are clear distinctions between the fluoroscopic operation of an angiographic system and its acquisition modes (digital cine, digital angiography, digital subtraction angiography, etc.), the scope of this work was limited to the fluoroscopic operation of the systems studied. The use of spectral shaping filters in cardiovascular and interventional angiography equipment has been shown to reduce patient dose. If the imaging control algorithm were programmed to work in conjunction with the selected spectral filter, and if the generator parameters were optimized for the selected filter, then image quality could also be improved. Although assessment of image quality was not included as part of this report, it was recognized that for fluoroscopic imaging the parameters that influence radiation output, differential absorption, and patient dose are also the same parameters that influence image quality. Therefore, this report will utilize the terminology "automatic dose rate and image quality" (ADRIQ) when describing the control logic in modern interventional angiographic systems and, where relevant, will describe the influence of controlled parameters on the subsequent image quality. A total of 22 angiography units were investigated by the task group and of these one each was chosen as representative of the equipment manufactured by GE Healthcare, Philips Medical Systems, Shimadzu Medical USA, and Siemens Medical Systems. All equipment, for which measurement data were included in this report, was manufactured within the three year period from 2006 to 2008. Using polymethylmethacrylate (PMMA) plastic to simulate patient attenuation, each angiographic imaging system was evaluated by recording the following parameters: tube potential in units of kilovolts peak (kVp), tube current in units of milliamperes (mA), pulse width (PW) in units of milliseconds (ms), spectral filtration setting, and patient air kerma rate (PAKR) as a function of the attenuator thickness. Data were graphically plotted to reveal the manner in which the ADRIQ control logic responded to changes in object attenuation. There were similarities in the manner in which the ADRIQ control logic operated that allowed the four chosen devices to be divided into two groups, with two of the systems in each group. There were also unique approaches to the ADRIQ control logic that were associated with some of the systems, and these are described in the report. The evaluation revealed relevant information about the testing procedure and also about the manner in which different manufacturers approach the utilization of spectral filtration, pulsed fluoroscopy, and maximum PAKR limitation. This information should be particularly valuable to the clinical medical physicist charged with acceptance testing and performance evaluation of modern angiographic systems.

  9. 30 CFR 57.9316 - Notifying the equipment operator.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., Hauling, and Dumping Safety Devices, Provisions, and Procedures for Roadways, Railroads, and Loading and Dumping Sites § 57.9316 Notifying the equipment operator. When an operator of self-propelled mobile...

  10. 30 CFR 56.9316 - Notifying the equipment operator.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., Hauling, and Dumping Safety Devices, Provisions, and Procedures for Roadways, Railroads, and Loading and Dumping Sites § 56.9316 Notifying the equipment operator. When an operator of self-propelled mobile...

  11. Commercial diving fatalities.

    PubMed

    Bradley, M E

    1984-08-01

    The distributions of fatal diving accidents in commercial diver populations were examined in the Gulf of Mexico from 1968 to 1975 and in the British sector of the North Sea from 1971 to 1978. Influences and causes of death were analyzed by examining the interaction between host, environmental and agent factors. The interaction of host and environmental factors appeared to be the greatest contributing factor to diving fatalities among the estimated 900 commercial divers in the Gulf of Mexico and the 700 in the North Sea. The most significant host factors were level of experience and behavioral dysfunction. They are also the host characteristics most amenable to change through improved and more thorough training. The most significant environmental factors were equipment failure and supervisor/tender errors. These factors would be minimized by improved selection, maintenance and operation of equipment, together with improved operating and emergency diving procedures. In recent years there has been a significant downward trend in mortality rates in the commercial diver populations of this study due to improved diving techniques and operations. Further research is needed, however, on the cause(s) of diver unconsciousness and inexplicable actions that occur at depths below 91.44m (300 ft.).

  12. Liver injuries in children: the role of selective non-operative management.

    PubMed

    Nouira, Faouzi; Kerkeni, Yosra; Ben Amor, Anissa; Ben Ahmed, Yosra; Charieg, Aouatef; Khemakhem, Rachid; Ghorbel, Soufiane; Jlidi, Said; Ben Kahlifa, Sonia; Chaouachi, Beji

    2012-02-01

    Trauma remains the leading cause of mortality in the pediatric population. Liver injuries occur commonly in blunt abdominal trauma. To assess the selective non-operative management of liver injuries in children. A retrospective review of 51 patients with a discharge diagnosis of traumatic liver injuries at Tunis Children's Hospital, over a 14-year period from 1996 to 2009. We identified 51 patients with liver trauma. The median age was 7 years. Boys accounted for 58% (n= 30), and the most common cause was traffic accident. Head injuries were the most common associated injuries. Forty-nine patients (96%) required non-operative management without complications. The mean in-hospital stay was 10 days in this group. The ultrasound demonstrated complete resolution and healing after 3-6 months. Two patients underwent surgery for hemodynamic instability. The mortality rate was 0.2 %. Safe, non-operative management involves careful serial examination, a CT scanning facility and close monitoring of the patient in a fully equipped high-dependency unit with trained staff to run it. Even though most patients can be treated non-operatively the challenge is to identify the severely injured child early and institute aggressive resuscitation and expedite laparotomy.

  13. Applications of Optimal Building Energy System Selection and Operation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Marnay, Chris; Stadler, Michael; Siddiqui, Afzal

    2011-04-01

    Berkeley Lab has been developing the Distributed Energy Resources Customer Adoption Model (DER-CAM) for several years. Given load curves for energy services requirements in a building microgrid (u grid), fuel costs and other economic inputs, and a menu of available technologies, DER-CAM finds the optimum equipment fleet and its optimum operating schedule using a mixed integer linear programming approach. This capability is being applied using a software as a service (SaaS) model. Optimisation problems are set up on a Berkeley Lab server and clients can execute their jobs as needed, typically daily. The evolution of this approach is demonstrated bymore » description of three ongoing projects. The first is a public access web site focused on solar photovoltaic generation and battery viability at large commercial and industrial customer sites. The second is a building CO2 emissions reduction operations problem for a University of California, Davis student dining hall for which potential investments are also considered. And the third, is both a battery selection problem and a rolling operating schedule problem for a large County Jail. Together these examples show that optimization of building u grid design and operation can be effectively achieved using SaaS.« less

  14. Back Propagation Artificial Neural Network and Its Application in Fault Detection of Condenser Failure in Thermo Plant

    NASA Astrophysics Data System (ADS)

    Ismail, Firas B.; Thiruchelvam, Vinesh

    2013-06-01

    Steam condenser is one of the most important equipment in steam power plants. If the steam condenser trips it may lead to whole unit shutdown, which is economically burdensome. Early condenser trips monitoring is crucial to maintain normal and safe operational conditions. In the present work, artificial intelligent monitoring systems specialized in condenser outages has been proposed and coded within the MATLAB environment. The training and validation of the system has been performed using real operational measurements captured from the control system of selected steam power plant. An integrated plant data preparation scheme for condenser outages with related operational variables has been proposed. Condenser outages under consideration have been detected by developed system before the plant control system"

  15. Power system interface and umbilical system study

    NASA Technical Reports Server (NTRS)

    1980-01-01

    System requirements and basic design criteria were defined for berthing or docking a payload to the 25 kW power module which will provide electrical power and attitude control, cooling, data transfer, and communication services to free-flying and Orbiter sortie payloads. The selected umbilical system concept consists of four assemblies and command and display equipment to be installed at the Orbiter payload specialist station: (1) a movable platen assembly which is attached to the power system with EVA operable devices; (2) a slave platen assembly which is attached to the payload with EVA operable devices; (3) a fixed secondary platen permanently installed in the power system; and (4) a fixed secondary platen permanently installed on the payload. Operating modes and sequences are described.

  16. 49 CFR 218.91 - Purpose and scope.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., DEPARTMENT OF TRANSPORTATION RAILROAD OPERATING PRACTICES Handling Equipment, Switches, and Fixed Derails... can result from the mishandling of equipment, switches, and fixed derails. (b) This subpart prescribes minimum operating rule requirements for the handling of equipment, switches, and fixed derails. Each...

  17. 49 CFR 218.91 - Purpose and scope.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., DEPARTMENT OF TRANSPORTATION RAILROAD OPERATING PRACTICES Handling Equipment, Switches, and Fixed Derails... can result from the mishandling of equipment, switches, and fixed derails. (b) This subpart prescribes minimum operating rule requirements for the handling of equipment, switches, and fixed derails. Each...

  18. 49 CFR 218.91 - Purpose and scope.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF TRANSPORTATION RAILROAD OPERATING PRACTICES Handling Equipment, Switches, and Fixed Derails... can result from the mishandling of equipment, switches, and fixed derails. (b) This subpart prescribes minimum operating rule requirements for the handling of equipment, switches, and fixed derails. Each...

  19. 49 CFR 218.91 - Purpose and scope.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., DEPARTMENT OF TRANSPORTATION RAILROAD OPERATING PRACTICES Handling Equipment, Switches, and Fixed Derails... can result from the mishandling of equipment, switches, and fixed derails. (b) This subpart prescribes minimum operating rule requirements for the handling of equipment, switches, and fixed derails. Each...

  20. 49 CFR 218.91 - Purpose and scope.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF TRANSPORTATION RAILROAD OPERATING PRACTICES Handling Equipment, Switches, and Fixed Derails... can result from the mishandling of equipment, switches, and fixed derails. (b) This subpart prescribes minimum operating rule requirements for the handling of equipment, switches, and fixed derails. Each...

  1. Update on MTTF figures for linear and rotary coolers of Thales Cryogenics

    NASA Astrophysics Data System (ADS)

    van de Groep, W.; van der Weijden, H.; van Leeuwen, R.; Benschop, T.; Cauquil, J. M.; Griot, R.

    2012-06-01

    Thales Cryogenics has an extensive background in delivering linear and rotary coolers for military, civil and space programs. During the last years several technical improvements have increased the lifetime of all Thales coolers resulting in significantly higher Mean Time To Failure (MTTF) figures. In this paper not only updated MTTF values for most of the products in our portfolio will be presented but also the methodology used to come to these reliability figures will be explained. The differences between rotary and linear coolers will be highlighted including the different failure modes influencing the lifetime under operational conditions. These updated reliability figures are based on extensive test results for both rotary and linear coolers as well as Weibull analysis, failure mode identifications, various types of lifetime testing and field results of operational coolers. The impact of the cooler selection for typical applications will be outlined. This updated reliability approach will enable an improved tradeoff for cooler selection in applications where MTTF and a correct reliability assessment is key. Improbing on cooler selection and an increased insight in cooler reliability will result in a higher uptime and operability of equipment, less risk on unexpected failures and lower costs of ownership.

  2. Mine Winder Drives in Integrated Copper Complex

    NASA Astrophysics Data System (ADS)

    Dey, Pranab Kumar

    2018-04-01

    This paper describes various features required to be evaluated before selecting mine winder drives. In handling such project, the selection of proper equipments is necessary at the initial design stage of planning and how the electrical system design considers all aspects to protect the grid from unwarranted influence of the connected loads and minimize the generation of harmonics due to network configurations adopted to keep it within the stipulated value dictated by the supply authorities has been discussed. The design should cover all aspects to provide quality power with effective braking system required as per the mining statute for operational safety. It also emphasizes on the requirement of quality maintenance.

  3. A space-based public service platform for terrestrial rescue operations

    NASA Technical Reports Server (NTRS)

    Fleisig, R.; Bernstein, J.; Cramblit, D. C.

    1977-01-01

    The space-based Public Service Platform (PSP) is a multibeam, high-gain communications relay satellite that can provide a variety of functions for a large number of people on earth equipped with extremely small, very low cost transceivers. This paper describes the PSP concept, the rationale used to derive the concept, the criteria for selecting specific communication functions to be performed, and the advantages of performing such functions via satellite. The discussion focuses on the benefits of using a PSP for natural disaster warning; control of attendant rescue/assistance operations; and rescue of people in downed aircraft, aboard sinking ships, lost or injured on land.

  4. Integrated control system for electron beam processes

    NASA Astrophysics Data System (ADS)

    Koleva, L.; Koleva, E.; Batchkova, I.; Mladenov, G.

    2018-03-01

    The ISO/IEC 62264 standard is widely used for integration of the business systems of a manufacturer with the corresponding manufacturing control systems based on hierarchical equipment models, functional data and manufacturing operations activity models. In order to achieve the integration of control systems, formal object communication models must be developed, together with manufacturing operations activity models, which coordinate the integration between different levels of control. In this article, the development of integrated control system for electron beam welding process is presented as part of a fully integrated control system of an electron beam plant, including also other additional processes: surface modification, electron beam evaporation, selective melting and electron beam diagnostics.

  5. Chapter 9. Mechanical plant control

    Treesearch

    Richard Stevens; Steven B. Monsen

    2004-01-01

    When planning a restoration or rehabilitation project, proper equipment selection should be a high priority. Equipment should be selected that is adapted to the treatment site, and that when properly used, will fulfill and add to the objectives of the treatment. Equipment should be economical and ecologically sound.

  6. Mariner Mars 1971 science operational support equipment

    NASA Technical Reports Server (NTRS)

    1971-01-01

    The Mariner Mars 1971 science operational support equipment (SOSE) was developed to support the checkout of the proof test model and flight spacecraft. The test objectives of the SOSE and how these objectives were implemented are discussed. Attention is focused on the computer portion of the SOSE, since incorporation of a computer in ground checkout equipment represents a major departure from the support equipment concepts previously used. A functional description of the major hardware elements contained in the SOSE is also included, along with the operational performance of the SOSE during spacecraft testing.

  7. Computer Maintenance Operations Center (CMOC), additional computer support equipment ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Computer Maintenance Operations Center (CMOC), additional computer support equipment - Beale Air Force Base, Perimeter Acquisition Vehicle Entry Phased-Array Warning System, Techinical Equipment Building, End of Spencer Paul Road, north of Warren Shingle Road (14th Street), Marysville, Yuba County, CA

  8. Imaging Sensor Flight and Test Equipment Software

    NASA Technical Reports Server (NTRS)

    Freestone, Kathleen; Simeone, Louis; Robertson, Byran; Frankford, Maytha; Trice, David; Wallace, Kevin; Wilkerson, DeLisa

    2007-01-01

    The Lightning Imaging Sensor (LIS) is one of the components onboard the Tropical Rainfall Measuring Mission (TRMM) satellite, and was designed to detect and locate lightning over the tropics. The LIS flight code was developed to run on a single onboard digital signal processor, and has operated the LIS instrument since 1997 when the TRMM satellite was launched. The software provides controller functions to the LIS Real-Time Event Processor (RTEP) and onboard heaters, collects the lightning event data from the RTEP, compresses and formats the data for downlink to the satellite, collects housekeeping data and formats the data for downlink to the satellite, provides command processing and interface to the spacecraft communications and data bus, and provides watchdog functions for error detection. The Special Test Equipment (STE) software was designed to operate specific test equipment used to support the LIS hardware through development, calibration, qualification, and integration with the TRMM spacecraft. The STE software provides the capability to control instrument activation, commanding (including both data formatting and user interfacing), data collection, decompression, and display and image simulation. The LIS STE code was developed for the DOS operating system in the C programming language. Because of the many unique data formats implemented by the flight instrument, the STE software was required to comprehend the same formats, and translate them for the test operator. The hardware interfaces to the LIS instrument using both commercial and custom computer boards, requiring that the STE code integrate this variety into a working system. In addition, the requirement to provide RTEP test capability dictated the need to provide simulations of background image data with short-duration lightning transients superimposed. This led to the development of unique code used to control the location, intensity, and variation above background for simulated lightning strikes at user-selected locations.

  9. Research on the Mean Logistic Delay Time of the Development Phrass

    NASA Astrophysics Data System (ADS)

    Na, Hou; Yi, Li; Wang, Yi-Gang; Liu, Jun-jie; Bo, Zhang; Lv, Xue-Zhi

    MIDT is a key parameter affecting operational availability though equipment designing, operation and support management. In operation process, how to strengthen the support management, layout rationally supports resource, provide support resource of the equipment maintenance, in order to avoid or reduce support; ensure MLDT satisfied to Ao's requests. It's an urgently solved question that how to assort with the RMS of equipment.

  10. Deep Space Network equipment performance, reliability, and operations management information system

    NASA Technical Reports Server (NTRS)

    Cooper, T.; Lin, J.; Chatillon, M.

    2002-01-01

    The Deep Space Mission System (DSMS) Operations Program Office and the DeepSpace Network (DSN) facilities utilize the Discrepancy Reporting Management System (DRMS) to collect, process, communicate and manage data discrepancies, equipment resets, physical equipment status, and to maintain an internal Station Log. A collaborative effort development between JPL and the Canberra Deep Space Communication Complex delivered a system to support DSN Operations.

  11. Materials selection guidelines for geothermal energy utilization systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ellis, P.F. II; Conover, M.F.

    1981-01-01

    This manual includes geothermal fluid chemistry, corrosion test data, and materials operating experience. Systems using geothermal energy in El Salvador, Iceland, Italy, Japan, Mexico, New Zealand, and the United States are described. The manual provides materials selection guidelines for surface equipment of future geothermal energy systems. The key chemical species that are significant in determining corrosiveness of geothermal fluids are identified. The utilization modes of geothermal energy are defined as well as the various physical fluid parameters that affect corrosiveness. Both detailed and summarized results of materials performance tests and applicable operating experiences from forty sites throughout the world aremore » presented. The application of various non-metal materials in geothermal environments are discussed. Included in appendices are: corrosion behavior of specific alloy classes in geothermal fluids, corrosion in seawater desalination plants, worldwide geothermal power production, DOE-sponsored utilization projects, plant availability, relative costs of alloys, and composition of alloys. (MHR)« less

  12. Artificial neural networks for the performance prediction of heat pump hot water heaters

    NASA Astrophysics Data System (ADS)

    Mathioulakis, E.; Panaras, G.; Belessiotis, V.

    2018-02-01

    The rapid progression in the use of heat pumps, due to the decrease in the equipment cost, together with the favourable economics of the consumed electrical energy, has been combined with the wide dissemination of air-to-water heat pumps (AWHPs) in the residential sector. The entrance of the respective systems in the commercial sector has made important the modelling of the processes. In this work, the suitability of artificial neural networks (ANN) in the modelling of AWHPs is investigated. The ambient air temperature in the evaporator inlet and the water temperature in the condenser inlet have been selected as the input variables; energy performance indices and quantities characterising the operation of the system have been selected as output variables. The results verify that the, easy-to-implement, trained ANN can represent an effective tool for the prediction of the AWHP performance in various operation conditions and the parametrical investigation of their behaviour.

  13. Regenerable non-venting cooler for protective suit

    NASA Technical Reports Server (NTRS)

    Roebelen, Jr., George J. (Inventor); Bayes, Stephen A. (Inventor)

    1992-01-01

    A life support back pack 14 for use during extravehicular activity in space incorporates a cooling apparatus 20 comprised of five panels 22 each of which include in layered fashion a LCG coolant heat exchange coil 32, a heat distribution plate 42, and a heat dissipation module 50A or 50B having an outer radiator surface 52. Each module 50A houses a first phase change material 55A, for example hexadecane paraffin, and each module 50B houses a second phase change material 55B, for example tetradecane paraffin, which has a phase change temperature which is less than the phase change temperature of the first phase change material 55A. The cooling apparatus 20 is equipped with a coolant heat exchange circuit provided with mode selection valves 84 and 86 which are operated by a controller 88 to selectively direct the LCG coolant to be cooled through the cooling apparatus in one of three operating modes.

  14. Program operational summary: Operational 90 day manned test of a regenerative life support system

    NASA Technical Reports Server (NTRS)

    Jackson, J. K.; Wamsley, J. R.; Bonura, M. S.; Seeman, J. S.

    1972-01-01

    An operational 90-day manned test of a regenerative life support system was successfully completed. This test was performed with a crew of four carefully selected and trained men in a space station simulator (SSS) which had a two gas atmosphere maintained at a total pressure of 68.9, 10 psia, and composed of oxygen at a partial pressure of 3.05 psia with nitrogen as the diluent. The test was planned to provide data on regenerative life support subsystems and on integrated system operations in a closed ecology, similar to that of a space station. All crew equipment and expendables were stored onboard at the start of the mission to eliminate the need for pass-in operations. The significant accomplishments of the test, some of the pertinent test results, some of the problem areas, and conclusions are presented.

  15. Heavy Equipment Operator: General Equipment Operator. Instructional Materials.

    ERIC Educational Resources Information Center

    Hendrix, Laborn J.; Sawatzky, Joyce

    Developed through close coordination between contractors, construction workers, and vocational educators, this instructor's manual is designed to help heavy equipment instructors present materials in a systematic format. The instructional materials in the manual are written in terms of student performance, using measurable behavioral objectives.…

  16. Investigation of selected disk systems

    NASA Technical Reports Server (NTRS)

    1976-01-01

    The large disk systems offered by IBM, UNIVAC, Digital Equipment Corporation, and Data General were examined. In particular, these disk systems were analyzed in terms of how well available operating systems take advantage of the respective disk controller's transfer rates, and to what degree all available data for optimizing disk usage is effectively employed. In the course of this analysis, generic functions and components of disk systems were defined and the capabilities of the surveyed disk system were investigated.

  17. 46 CFR 97.90-1 - Pilot boarding operation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Pilot boarding operation. 97.90-1 Section 97.90-1... OPERATIONS Pilot Boarding Operations § 97.90-1 Pilot boarding operation. (a) The master shall ensure that pilot boarding equipment is maintained as follows: (1) The equipment must be kept clean and in good...

  18. 46 CFR 97.90-1 - Pilot boarding operation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Pilot boarding operation. 97.90-1 Section 97.90-1... OPERATIONS Pilot Boarding Operations § 97.90-1 Pilot boarding operation. (a) The master shall ensure that pilot boarding equipment is maintained as follows: (1) The equipment must be kept clean and in good...

  19. CONCEPTUAL DESIGN ASSESSMENT FOR THE CO-FIRING OF BIO-REFINERY SUPPLIED LIGNIN PROJECT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ted Berglund; Jeffrey T. Ranney; Carol L. Babb

    2001-01-01

    The major aspects of this project are proceeding toward completion. Prior to this quarter, design criteria, tentative site selection, facility layout, and preliminary facility cost estimates have been completed and issued for review. Processing of bio-solids was completed, providing material for the pilot operations. Pilot facility design, equipment selection, and modification were completed during the fourth quarter. Initial pilot facility shakedown was completed during the fourth quarter. During pilot plant shakedown operations, several production batch test runs were performed. These pilot tests were coupled with laboratory testing to confirm pilot results. In initial batches of operations, cellulose to glucose conversionsmore » of 62.5% and 64.8% were observed in laboratory hydrolysis. As part of this testing, lignin dewatering was tested using laboratory and vendor-supplied filtration equipment. Dewatering tests reported moisture contents in the lignin of between 50% and 60%. Dewatering parameters and options will continue to be investigated during lignin production. After some unavoidable delays, a suitable representative supply of MSW feed material was procured. Shredding of the feed material was completed and final drying of the feed is expected to be completed by late January. Once feed drying is completed, pilot facility production will begin to produce lignin for co-fire testing. Facility modifications are expected to continue to improve facility operations and performance during the first quarter of 2001. The TVA-Colbert facility continues to make progress in evaluating the co-location of the Masada facility on the operation of the power generation facility. The TVA-Colbert fossil plant is fully capable of providing a reliable steam supply. The preferred steam supply connection points and steam pipeline routing have been identified. The environmental review of the pipeline routing has been completed and no major impacts have been identified. Detailed assessment of steam export impacts on the Colbert boiler system continues.« less

  20. Improving the Reliability of Technological Subsystems Equipment for Steam Turbine Unit in Operation

    NASA Astrophysics Data System (ADS)

    Brodov, Yu. M.; Murmansky, B. E.; Aronson, R. T.

    2017-11-01

    The authors’ conception is presented of an integrated approach to reliability improving of the steam turbine unit (STU) state along with its implementation examples for the various STU technological subsystems. Basing on the statistical analysis of damage to turbine individual parts and components, on the development and application of modern methods and technologies of repair and on operational monitoring techniques, the critical components and elements of equipment are identified and priorities are proposed for improving the reliability of STU equipment in operation. The research results are presented of the analysis of malfunctions for various STU technological subsystems equipment operating as part of power units and at cross-linked thermal power plants and resulting in turbine unit shutdown (failure). Proposals are formulated and justified for adjustment of maintenance and repair for turbine components and parts, for condenser unit equipment, for regeneration subsystem and oil supply system that permit to increase the operational reliability, to reduce the cost of STU maintenance and repair and to optimize the timing and amount of repairs.

  1. Keys: The Media Maze.

    ERIC Educational Resources Information Center

    Richison, Tom Z.

    This guide is designed to be used as a reference tool for the novice library media specialist in charge of one or several pieces of equipment that must be maintained or repaired periodically. Under acquisition of new equipment, topics include selection procedures and equipment selection aids, while the organization section discusses numbering,…

  2. 14 CFR 23.1415 - Ditching equipment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Ditching equipment. (a) Emergency flotation and signaling equipment required by any operating rule in this... each life preserver must be approved. (c) Each raft released automatically or by the pilot must be... any operating rule in this chapter, must be accessible, function satisfactorily, and must be free of...

  3. 40 CFR 265.401 - General operating requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... equipment, the process or equipment must be equipped with a means to stop this inflow (e.g., a waste feed....401 Section 265.401 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND...

  4. 33 CFR 169.245 - What must a ship master do if LRIT equipment is switched off or fails to operate?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false What must a ship master do if... master do if LRIT equipment is switched off or fails to operate? (a) If a ship's LRIT equipment is switched off or fails to operate, the ship's master must inform his or her Flag Administration without...

  5. A life sciences Spacelab mission simulation

    NASA Technical Reports Server (NTRS)

    Mason, J. A.; Musgrave, F. S.; Morrison, D. R.

    1977-01-01

    The paper describes the purposes of a seven-day simulated life-sciences mission conducted in a Spacelab simulator. A major objective was the evaluation of in-orbit Spacelab operations and those mission control support functions which will be required from the Payload Operations Center. Tested equipment and procedures included experiment racks, common operational research equipment, commercial off-the-shelf equipment, experiment hardware interfaces with Spacelab, experiment data handling concepts, and Spacelab trash management.

  6. BSL-3 laboratory practices in the United States: comparison of select agent and non-select agent facilities.

    PubMed

    Richards, Stephanie L; Pompei, Victoria C; Anderson, Alice

    2014-01-01

    New construction of biosafety level 3 (BSL-3) laboratories in the United States has increased in the past decade to facilitate research on potential bioterrorism agents. The Centers for Disease Control and Prevention inspect BSL-3 facilities and review commissioning documentation, but no single agency has oversight over all BSL-3 facilities. This article explores the extent to which standard operating procedures in US BSL-3 facilities vary between laboratories with select agent or non-select agent status. Comparisons are made for the following variables: personnel training, decontamination, personal protective equipment (PPE), medical surveillance, security access, laboratory structure and maintenance, funding, and pest management. Facilities working with select agents had more complex training programs and decontamination procedures than non-select agent facilities. Personnel working in select agent laboratories were likely to use powered air purifying respirators, while non-select agent laboratories primarily used N95 respirators. More rigorous medical surveillance was carried out in select agent workers (although not required by the select agent program) and a higher level of restrictive access to laboratories was found. Most select agent and non-select agent laboratories reported adequate structural integrity in facilities; however, differences were observed in personnel perception of funding for repairs. Pest management was carried out by select agent personnel more frequently than non-select agent personnel. Our findings support the need to promote high quality biosafety training and standard operating procedures in both select agent and non-select agent laboratories to improve occupational health and safety.

  7. BSL-3 Laboratory Practices in the United States: Comparison of Select Agent and Non–Select Agent Facilities

    PubMed Central

    Pompei, Victoria C.; Anderson, Alice

    2014-01-01

    New construction of biosafety level 3 (BSL-3) laboratories in the United States has increased in the past decade to facilitate research on potential bioterrorism agents. The Centers for Disease Control and Prevention inspect BSL-3 facilities and review commissioning documentation, but no single agency has oversight over all BSL-3 facilities. This article explores the extent to which standard operating procedures in US BSL-3 facilities vary between laboratories with select agent or non–select agent status. Comparisons are made for the following variables: personnel training, decontamination, personal protective equipment (PPE), medical surveillance, security access, laboratory structure and maintenance, funding, and pest management. Facilities working with select agents had more complex training programs and decontamination procedures than non–select agent facilities. Personnel working in select agent laboratories were likely to use powered air purifying respirators, while non–select agent laboratories primarily used N95 respirators. More rigorous medical surveillance was carried out in select agent workers (although not required by the select agent program) and a higher level of restrictive access to laboratories was found. Most select agent and non–select agent laboratories reported adequate structural integrity in facilities; however, differences were observed in personnel perception of funding for repairs. Pest management was carried out by select agent personnel more frequently than non–select agent personnel. Our findings support the need to promote high quality biosafety training and standard operating procedures in both select agent and non–select agent laboratories to improve occupational health and safety. PMID:24552359

  8. Internet Based Remote Operations

    NASA Technical Reports Server (NTRS)

    Chamberlain, James

    1999-01-01

    This is the Final Report for the Internet Based Remote Operations Contract, has performed payload operations research support tasks March 1999 through September 1999. These tasks support the GSD goal of developing a secure, inexpensive data, voice, and video mission communications capability between remote payload investigators and the NASA payload operations team in the International Space Station (ISS) era. AZTek has provided feedback from the NASA payload community by utilizing its extensive payload development and operations experience to test and evaluate remote payload operations systems. AZTek has focused on use of the "public Internet" and inexpensive, Commercial-off-the-shelf (COTS) Internet-based tools that would most benefit "small" (e.g., $2 Million or less) payloads and small developers without permanent remote operations facilities. Such projects have limited budgets to support installation and development of high-speed dedicated communications links and high-end, custom ground support equipment and software. The primary conclusions of the study are as follows: (1) The trend of using Internet technology for "live" collaborative applications such as telescience will continue. The GSD-developed data and voice capabilities continued to work well over the "public" Internet during this period. 2. Transmitting multiple voice streams from a voice-conferencing server to a client PC to be mixed and played on the PC is feasible. 3. There are two classes of voice vendors in the market: - Large traditional phone equipment vendors pursuing integration of PSTN with Internet, and Small Internet startups.The key to selecting a vendor will be to find a company sufficiently large and established to provide a base voice-conferencing software product line for the next several years.

  9. Monitoring radionuclide and suspended-sediment transport in the Little Colorado River basin, Arizona and New Mexico, USA

    USGS Publications Warehouse

    Gray, John R.; Fisk, Gregory G.

    1992-01-01

    From July 1988 through September 1991, radionuclide and suspended-sediment transport were monitored in ephemeral streams in the semiarid Little Colorado River basin of Arizona and New Mexico, USA, where in-stream gross-alpha plus gross-beta activities have exceeded Arizona's Maximum Allowable Limit through releases from natural weathering processes and from uranium-mining operations in the Church Rock Mining District, Grants Mineral Belt, New Mexico. Water samples were collected at a network of nine continuous-record streamgauges equipped with microprocessor-based satellite telemetry and automatic water-sampling systems, and six partial-record streamgauges equipped with passive water samplers. Analytical results from these samples were used to calculate transport of selected suspended and dissolved radionuclides in the uranium-238 and thorium-232 decay series.

  10. Internal corrosion monitoring of subsea oil and gas production equipment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Joosten, M.W.; Fischer, K.P.; Strommen, R.

    1995-04-01

    Nonintrusive techniques will dominate subsea corrosion monitoring compared with the intrusive methods because such methods do not interfere with pipeline operations. The long-term reliability of the nonintrusive techniques in general is considered to be much better than that of intrusive-type probes. The nonintrusive techniques based on radioactive tracers (TLA, NA) and FSM and UT are expected to be the main types of subsea corrosion monitoring equipment in the coming years. Available techniques that could be developed specifically for subsea applications are: electrochemical noise, corrosion potentials (using new types of reference electrodes), multiprobe system for electrochemical measurements, and video camera inspectionmore » (mini-video camera with light source). The following innovative techniques have potential but need further development: ion selective electrodes, radioactive tracers, and Raman spectroscopy.« less

  11. 36 CFR 1281.3 - What definitions apply to this part?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... part, the term means operating equipment that must be furnished with the new library and included in the calculation of the required endowment. Operating equipment is fundamental to the operation of the...) and established as part of the system of Presidential libraries managed by NARA. Facility operations...

  12. 48 CFR 52.247-25 - Government-Furnished Equipment With or Without Operators.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... transportation or for transportation-related services when the Government furnishes equipment with or without... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Government-Furnished... Text of Provisions and Clauses 52.247-25 Government-Furnished Equipment With or Without Operators. As...

  13. 48 CFR 52.247-25 - Government-Furnished Equipment With or Without Operators.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... transportation or for transportation-related services when the Government furnishes equipment with or without... 48 Federal Acquisition Regulations System 2 2011-10-01 2011-10-01 false Government-Furnished... Text of Provisions and Clauses 52.247-25 Government-Furnished Equipment With or Without Operators. As...

  14. 48 CFR 246.270 - Safety of facilities, infrastructure, and equipment for military operations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ASSURANCE Contract Quality Requirements 246.270 Safety of facilities, infrastructure, and equipment for... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Safety of facilities, infrastructure, and equipment for military operations. 246.270 Section 246.270 Federal Acquisition Regulations...

  15. 18 CFR 367.3960 - Account 396, Power operated equipment.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Account 396, Power operated equipment. 367.3960 Section 367.3960 Conservation of Power and Water Resources FEDERAL ENERGY... work exclusive of equipment includible in other accounts. Include, also, the tools and accessories...

  16. 18 CFR 367.3960 - Account 396, Power operated equipment.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Account 396, Power operated equipment. 367.3960 Section 367.3960 Conservation of Power and Water Resources FEDERAL ENERGY... work exclusive of equipment includible in other accounts. Include, also, the tools and accessories...

  17. 18 CFR 367.3960 - Account 396, Power operated equipment.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Account 396, Power operated equipment. 367.3960 Section 367.3960 Conservation of Power and Water Resources FEDERAL ENERGY... work exclusive of equipment includible in other accounts. Include, also, the tools and accessories...

  18. 18 CFR 367.3960 - Account 396, Power operated equipment.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Account 396, Power operated equipment. 367.3960 Section 367.3960 Conservation of Power and Water Resources FEDERAL ENERGY... work exclusive of equipment includible in other accounts. Include, also, the tools and accessories...

  19. 38 CFR 39.50 - Amount of grant.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... an establishment grant, the cost of equipment necessary for the operation of the State or Tribal... equipment necessary for operation of the State or Tribal veterans cemetery, but only if such equipment: (i... fuel and fertilizer) that are routinely used in a cemetery; or (6) Fully enclosed, climate-controlled...

  20. 38 CFR 39.50 - Amount of grant.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... an establishment grant, the cost of equipment necessary for the operation of the State or Tribal... equipment necessary for operation of the State or Tribal veterans cemetery, but only if such equipment: (i... fuel and fertilizer) that are routinely used in a cemetery; or (6) Fully enclosed, climate-controlled...

  1. 38 CFR 39.50 - Amount of grant.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... an establishment grant, the cost of equipment necessary for the operation of the State or Tribal... equipment necessary for operation of the State or Tribal veterans cemetery, but only if such equipment: (i... fuel and fertilizer) that are routinely used in a cemetery; or (6) Fully enclosed, climate-controlled...

  2. 14 CFR 99.13 - Transponder-on requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... equipped with an operable radar beacon transponder, shall operate the transponder, including altitude... designated in subpart B of this part unless that aircraft is equipped with a coded radar beacon transponder..., within, or across the contiguous U.S. ADIZ unless that aircraft is equipped with a coded radar beacon...

  3. 14 CFR 99.13 - Transponder-on requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... equipped with an operable radar beacon transponder, shall operate the transponder, including altitude... designated in subpart B of this part unless that aircraft is equipped with a coded radar beacon transponder..., within, or across the contiguous U.S. ADIZ unless that aircraft is equipped with a coded radar beacon...

  4. 30 CFR 250.1913 - What criteria for operating procedures must my SEMS program meet?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... precautions must include control technology, personal protective equipment, and measures to be taken if...) Bypassing and flagging out-of-service equipment; (7) Safety and environmental consequences of deviating from your equipment operating limits and steps required to correct or avoid this deviation; (8) Properties...

  5. 14 CFR 99.13 - Transponder-on requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... equipped with an operable radar beacon transponder, shall operate the transponder, including altitude... designated in subpart B of this part unless that aircraft is equipped with a coded radar beacon transponder..., within, or across the contiguous U.S. ADIZ unless that aircraft is equipped with a coded radar beacon...

  6. 14 CFR 99.13 - Transponder-on requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... equipped with an operable radar beacon transponder, shall operate the transponder, including altitude... designated in subpart B of this part unless that aircraft is equipped with a coded radar beacon transponder..., within, or across the contiguous U.S. ADIZ unless that aircraft is equipped with a coded radar beacon...

  7. 14 CFR 99.13 - Transponder-on requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... equipped with an operable radar beacon transponder, shall operate the transponder, including altitude... designated in subpart B of this part unless that aircraft is equipped with a coded radar beacon transponder..., within, or across the contiguous U.S. ADIZ unless that aircraft is equipped with a coded radar beacon...

  8. Application and Operation of Audiovisual Equipment in Education.

    ERIC Educational Resources Information Center

    Pula, Fred John

    Interest in audiovisual aids in education has been increased by the shortage of classrooms and good teachers and by the modern predisposition toward learning by visual concepts. Effective utilization of audiovisual materials and equipment depends most importantly, on adequate preparation of the teacher in operating equipment and in coordinating…

  9. 40 CFR 60.634 - Alternative means of emission limitation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... any design, equipment, work practice or operational standard, the Administrator will publish, in the... the design, equipment, work practice or operational standard. ... applications under this section from either owners or operators of affected facilities, or manufacturers of...

  10. Satellite services system analysis study. Volume 5: Programmatics

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The overall program and resources needed for development and operation of a Satellite Services System is reviewed. Program requirements covered system operations through 1993 and were completed in preliminary form. Program requirements were refined based on equipment preliminary design and analysis. Schedules, costs, equipment utilization, and facility/advanced technology requirements were included in the update. Equipment user charges were developed for each piece of equipment and for representative satellite servicing missions.

  11. 40 CFR 60.2944 - What operating parameter monitoring equipment must I install, and what operating parameters must...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What operating parameter monitoring equipment must I install, and what operating parameters must I monitor? 60.2944 Section 60.2944 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Operator...

  12. Advance of Hazardous Operation Robot and its Application in Special Equipment Accident Rescue

    NASA Astrophysics Data System (ADS)

    Zeng, Qin-Da; Zhou, Wei; Zheng, Geng-Feng

    A survey of hazardous operation robot is given out in this article. Firstly, the latest researches such as nuclear industry robot, fire-fighting robot and explosive-handling robot are shown. Secondly, existing key technologies and their shortcomings are summarized, including moving mechanism, control system, perceptive technology and power technology. Thirdly, the trend of hazardous operation robot is predicted according to current situation. Finally, characteristics and hazards of special equipment accident, as well as feasibility of hazardous operation robot in the area of special equipment accident rescue are analyzed.

  13. The provision of clearances accuracy in piston - cylinder mating

    NASA Astrophysics Data System (ADS)

    Glukhov, V. I.; Shalay, V. V.

    2017-08-01

    The paper is aimed at increasing the quality of the pumping equipment in oil and gas industry. The main purpose of the study is to stabilize maximum values of productivity and durability of the pumping equipment based on the selective assembly of the cylinder-piston kinematic mating by optimization criterion. It is shown that the minimum clearance in the piston-cylinder mating is formed by maximum material dimensions. It is proved that maximum material dimensions are characterized by their own laws of distribution within the tolerance limits for the diameters of the cylinder internal mirror and the outer cylindrical surface of the piston. At that, their dispersion zones should be divided into size groups with a group tolerance equal to half the tolerance for the minimum clearance. The techniques for measuring the material dimensions - the smallest cylinder diameter and the largest piston diameter according to the envelope condition - are developed for sorting them into size groups. Reliable control of the dimensions precision ensures optimal minimum clearances of the piston-cylinder mating in all the size groups of the pumping equipment, necessary for increasing the equipment productivity and durability during the production, operation and repair processes.

  14. Office Operative Hysteroscopy: An Update.

    PubMed

    Salazar, Christina Alicia; Isaacson, Keith B

    2018-02-01

    Hysteroscopy is considered the gold standard for the evaluation of intracavitary pathology in both premenopausal and postmenopausal patients associated with abnormal uterine bleeding, as well as for the evaluation of infertile patients with suspected cavity abnormalities. Office-based operative hysteroscopy allows patients to resume activities immediately and successfully integrates clinical practice into a "see and treat" modality, avoiding the added risks of anesthesia and the inconvenience of the operating room. For 2017, the Centers for Medicare and Medicaid Services has provided a substantial increase in reimbursement for a select number of office-based hysteroscopic procedures. This review provides an update on the indications, equipment, and procedures for office hysteroscopy, as well as the management of complications that may arise within an office-based practice. Copyright © 2018. Published by Elsevier Inc.

  15. Acoustical design economic trade off for transport aircraft

    NASA Astrophysics Data System (ADS)

    Benito, A.

    The effects of ICAO fixed certification limits and local ordinances on acoustic emissions from jets on commercial transport aircraft and costs of operations are explored. The regulations effectively ban some aircraft from operation over populated areas, impose curfews on airports and, in conjunction with local civil aviation rules, levy extra taxes and quotas on noisier equipment. Jet engine manufacturers have attempted to increase the flow laminarity, decrease the exhaust speed and develop acoustic liners for selected duct areas. Retrofits are, however, not usually cost effective due to increased operational costs, e.g., fuel consumption can increase after engine modification because of increased weight. Finally, an attempt is made to assess, monetarily, the costs of noise pollution, wherein fines are levied for noisy aircraft and the money is spent insulating homes from noise.

  16. Synthesis of Trigeneration Systems: Sensitivity Analyses and Resilience

    PubMed Central

    Carvalho, Monica; Lozano, Miguel A.; Ramos, José; Serra, Luis M.

    2013-01-01

    This paper presents sensitivity and resilience analyses for a trigeneration system designed for a hospital. The following information is utilized to formulate an integer linear programming model: (1) energy service demands of the hospital, (2) technical and economical characteristics of the potential technologies for installation, (3) prices of the available utilities interchanged, and (4) financial parameters of the project. The solution of the model, minimizing the annual total cost, provides the optimal configuration of the system (technologies installed and number of pieces of equipment) and the optimal operation mode (operational load of equipment, interchange of utilities with the environment, convenience of wasting cogenerated heat, etc.) at each temporal interval defining the demand. The broad range of technical, economic, and institutional uncertainties throughout the life cycle of energy supply systems for buildings makes it necessary to delve more deeply into the fundamental properties of resilient systems: feasibility, flexibility and robustness. The resilience of the obtained solution is tested by varying, within reasonable limits, selected parameters: energy demand, amortization and maintenance factor, natural gas price, self-consumption of electricity, and time-of-delivery feed-in tariffs. PMID:24453881

  17. Synthesis of trigeneration systems: sensitivity analyses and resilience.

    PubMed

    Carvalho, Monica; Lozano, Miguel A; Ramos, José; Serra, Luis M

    2013-01-01

    This paper presents sensitivity and resilience analyses for a trigeneration system designed for a hospital. The following information is utilized to formulate an integer linear programming model: (1) energy service demands of the hospital, (2) technical and economical characteristics of the potential technologies for installation, (3) prices of the available utilities interchanged, and (4) financial parameters of the project. The solution of the model, minimizing the annual total cost, provides the optimal configuration of the system (technologies installed and number of pieces of equipment) and the optimal operation mode (operational load of equipment, interchange of utilities with the environment, convenience of wasting cogenerated heat, etc.) at each temporal interval defining the demand. The broad range of technical, economic, and institutional uncertainties throughout the life cycle of energy supply systems for buildings makes it necessary to delve more deeply into the fundamental properties of resilient systems: feasibility, flexibility and robustness. The resilience of the obtained solution is tested by varying, within reasonable limits, selected parameters: energy demand, amortization and maintenance factor, natural gas price, self-consumption of electricity, and time-of-delivery feed-in tariffs.

  18. Tools and Equipment Modeling for Automobile Interactive Assembling Operating Simulation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wu Dianliang; Zhu Hongmin; Shanghai Key Laboratory of Advance Manufacturing Environment

    Tools and equipment play an important role in the simulation of virtual assembly, especially in the assembly process simulation and plan. Because of variety in function and complexity in structure and manipulation, the simulation of tools and equipments remains to be a challenge for interactive assembly operation. Based on analysis of details and characteristics of interactive operations for automobile assembly, the functional requirement for tools and equipments of automobile assembly is given. Then, a unified modeling method for information expression and function realization of general tools and equipments is represented, and the handling methods of manual, semi-automatic, automatic tools andmore » equipments are discussed. Finally, the application in assembly simulation of rear suspension and front suspension of Roewe 750 automobile is given. The result shows that the modeling and handling methods are applicable in the interactive simulation of various tools and equipments, and can also be used for supporting assembly process planning in virtual environment.« less

  19. Operating environmental laboratories--an overview of analysis equipment procurement and management.

    PubMed

    Pandya, G H; Shinde, V M; Kanade, G S; Kondawar, V K

    2003-10-01

    Management of equipment in an environmental laboratory requires planning involving assessment of the workload on a particular equipment, establishment of criteria and specification for the purchase of equipment, creation of infrastructure for installation and testing of the equipment, optimization of analysis conditions, development of preventive maintenance procedures and establishment of in-house repair facilities. The paper reports the results of such an analysis carried for operating environmental laboratories associated with R& D work, serving as an Govt. laboratory or attached to an Industry for analysing industrial emissions.

  20. Variations Among Pilots from Different Flight Operations in Party Line Information Requirements for Situation Awareness

    NASA Technical Reports Server (NTRS)

    Pritchett, Amy; Hansman, John

    1997-01-01

    Current air traffic control communications use shared VHF voice frequencies from which pilots can obtain 'party line' information (PLI) by overhearing communications addressed to other aircraft. Previous studies have shown that pilots perceive PLI to be important. There is concern that some critical PLI may be lost in the proposed data link environment, where communications will be discretely addressed. Different types of flight operations will be equipped with data link equipment at different times, generating a mixed environment in which some pilots will rely on PLI, while others will receive their information by data link. To research the importance, availability, and accuracy of PLI and to query pilots on the information they feel is necessary for global situation awareness, a survey was distributed to pilots. The pilots were selected from four flight operation groups to study the variations in PLI requirements in the mixed data link environment. Pilots perceived PLI to be important overall, with specific traffic and weather information elements identified as critical. Most PLI elements followed a pattern of higher perceived importance during terminal area operations, final approach, and landing. Pilots from the different flight operation groups identified some elements as particularly important. In a free-response question designed to identify the information requirements for global situation awareness, pilots frequently indicated a need for traffic and weather information. The results of this survey reveal specific concerns to be addressed when implementing data link communications.

  1. Use of REMPI-TOFMS for real-time measurement of trace aromatics during operation of aircraft ground equipment

    NASA Astrophysics Data System (ADS)

    Gullett, Brian; Touati, Abderrahmane; Oudejans, Lukas

    Emissions of aromatic air toxics from aircraft ground equipment (AGE) were measured with a resonance enhanced multiphoton ionization-time of flight mass spectrometry (REMPI-TOFMS) system consisting of a pulsed solid state laser for photoionization and a TOFMS for mass discrimination. This instrument was capable of characterizing turbine emissions and the effect of varying load operations on pollutant production. REMPI-TOFMS is capable of high selectivity and low detection limits (part per trillion to part per billion) in real time (1 s resolution). Hazardous air pollutants and criteria pollutants were measured during startups and idle and full load operations. Measurements of compounds such as benzene, toluene, ethylbenzene, xylenes, styrene, and polycyclic aromatic hydrocarbons compared well with standard methods. Startup emissions from the AGE data showed persistent concentrations of pollutants, unlike those from a diesel generator, where a sharp spike in emissions rapidly declined to steady state levels. The time-resolved responses of air toxics concentrations varied significantly by source, complicating efforts to minimize these emissions with common operating prescriptions. The time-resolved measurements showed that pollutant concentrations decline (up to 5×) in a species-specific manner over the course of multiple hours of operation, complicating determination of accurate and precise emission factors via standard extractive sampling. Correlations of air toxic concentrations with more commonly measured pollutants such as CO or PM were poor due to the relatively greater changes in the measured toxics' concentrations.

  2. Master/Programmable-Slave Computer

    NASA Technical Reports Server (NTRS)

    Smaistrla, David; Hall, William A.

    1990-01-01

    Unique modular computer features compactness, low power, mass storage of data, multiprocessing, and choice of various input/output modes. Master processor communicates with user via usual keyboard and video display terminal. Coordinates operations of as many as 24 slave processors, each dedicated to different experiment. Each slave circuit card includes slave microprocessor and assortment of input/output circuits for communication with external equipment, with master processor, and with other slave processors. Adaptable to industrial process control with selectable degrees of automatic control, automatic and/or manual monitoring, and manual intervention.

  3. Night Operations - The Soviet Approach

    DTIC Science & Technology

    1978-06-09

    4 ,. ,,4 sized engineer equipments. Passive infrared field glasses are provided to Soviet troops and selected marksmen are armed with the Dravunov...up to 300 m Conversation of a few men up to 300 m Steps of a single man up to 40 m Axe blow , sound of a saw up to 500 m Blows of shovels and pickaxes...rocking frame simulators. Electric lightbulbs are popped to simulate the dazzle from the tank’s main gun muzzle flash. At Site Two, individual crew

  4. On Frequency Offset Estimation Using the iNET Preamble in Frequency Selective Fading Channels

    DTIC Science & Technology

    2014-03-01

    ASM fields; (bottom) the relationship between the indexes of the received samples r(n), the signal samples s(n), the preamble samples p (n) and the short...frequency offset estimators for SOQPSK-TG equipped with the iNET preamble and operating in ISI channels. Four of the five estimators exam - ined here are...sync marker ( ASM ), and data bits (an LDPC codeword). The availability of a preamble introduces the possibility of data-aided synchro- nization in

  5. 30 CFR 250.514 - Well-control fluids, equipment, and operations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... equivalent well-control fluid volume shall be calculated and posted near the operator's station. A mechanical... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Well-control fluids, equipment, and operations... OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Well-Completion...

  6. 30 CFR 250.408 - May I use alternative procedures or equipment during drilling operations?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... during drilling operations? 250.408 Section 250.408 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations General Requirements § 250.408 May I use alternative procedures or equipment...

  7. Highway Maintenance Equipment Operator: Basic Core. Training Materials.

    ERIC Educational Resources Information Center

    Perky, Sandra Dutreau; And Others

    This basic core curriculum is part of a three-part series of instructional guides designed for use in teaching a course in highway maintenance equipment operation. Addressed in the individual units of the curriculum, after an orientation unit, are safety; basic math; basic hand tools; procedures for loading. lashing, and unloading equipment;…

  8. 30 CFR 250.457 - What equipment is required to monitor drilling fluids?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Drilling Fluid Requirements § 250.457 What equipment is required to monitor drilling fluids? Once you... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What equipment is required to monitor drilling...

  9. 30 CFR 250.457 - What equipment is required to monitor drilling fluids?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Drilling Fluid Requirements § 250.457 What equipment is required... 30 Mineral Resources 2 2011-07-01 2011-07-01 false What equipment is required to monitor drilling...

  10. 30 CFR 250.457 - What equipment is required to monitor drilling fluids?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 2 2014-07-01 2014-07-01 false What equipment is required to monitor drilling..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Drilling Fluid Requirements § 250.457 What equipment is required to monitor...

  11. 30 CFR 250.457 - What equipment is required to monitor drilling fluids?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 2 2012-07-01 2012-07-01 false What equipment is required to monitor drilling..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Drilling Fluid Requirements § 250.457 What equipment is required to monitor...

  12. 30 CFR 250.457 - What equipment is required to monitor drilling fluids?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 2 2013-07-01 2013-07-01 false What equipment is required to monitor drilling..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Drilling Fluid Requirements § 250.457 What equipment is required to monitor...

  13. 30 CFR 250.1626 - Tubing and wellhead equipment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Tubing and wellhead equipment. 250.1626 Section... GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Sulphur Operations § 250.1626 Tubing and wellhead equipment. (a) No tubing string shall be placed into service or continue to be used unless such...

  14. Recommendations For The Safe Design, Operation And Use Of Commercial Sun Tanning Equipment

    NASA Astrophysics Data System (ADS)

    Cox, E. A.

    1982-02-01

    HSE Guidance Notes are being prepared to give recommendations to the designers, manufacturers, operators and users of commercial sun tanning equipment on the various health and safety aspects associated with the safe construction, siting and use of such equipment. Medically prescribed ultraviolet treatments are excluded from the guidance.

  15. 30 CFR 56.14200 - Warnings prior to starting or moving equipment.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Warnings prior to starting or moving equipment... MINES Machinery and Equipment Safety Practices and Operational Procedures § 56.14200 Warnings prior to... operators shall sound a warning that is audible above the surrounding noise level or use other effective...

  16. 30 CFR 56.14200 - Warnings prior to starting or moving equipment.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Warnings prior to starting or moving equipment... MINES Machinery and Equipment Safety Practices and Operational Procedures § 56.14200 Warnings prior to... operators shall sound a warning that is audible above the surrounding noise level or use other effective...

  17. 30 CFR 56.14200 - Warnings prior to starting or moving equipment.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Warnings prior to starting or moving equipment... MINES Machinery and Equipment Safety Practices and Operational Procedures § 56.14200 Warnings prior to... operators shall sound a warning that is audible above the surrounding noise level or use other effective...

  18. 30 CFR 56.14200 - Warnings prior to starting or moving equipment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Warnings prior to starting or moving equipment... MINES Machinery and Equipment Safety Practices and Operational Procedures § 56.14200 Warnings prior to... operators shall sound a warning that is audible above the surrounding noise level or use other effective...

  19. 47 CFR 15.507 - Marketing of UWB equipment.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 1 2014-10-01 2014-10-01 false Marketing of UWB equipment. 15.507 Section 15... Operation § 15.507 Marketing of UWB equipment. In some cases, the operation of UWB devices is limited to... state or local government. The marketing of UWB devices must be directed solely to parties eligible to...

  20. 47 CFR 15.507 - Marketing of UWB equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 1 2011-10-01 2011-10-01 false Marketing of UWB equipment. 15.507 Section 15... Operation § 15.507 Marketing of UWB equipment. In some cases, the operation of UWB devices is limited to... state or local government. The marketing of UWB devices must be directed solely to parties eligible to...

  1. 47 CFR 15.507 - Marketing of UWB equipment.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 1 2013-10-01 2013-10-01 false Marketing of UWB equipment. 15.507 Section 15... Operation § 15.507 Marketing of UWB equipment. In some cases, the operation of UWB devices is limited to... state or local government. The marketing of UWB devices must be directed solely to parties eligible to...

  2. 47 CFR 15.507 - Marketing of UWB equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Marketing of UWB equipment. 15.507 Section 15... Operation § 15.507 Marketing of UWB equipment. In some cases, the operation of UWB devices is limited to... state or local government. The marketing of UWB devices must be directed solely to parties eligible to...

  3. 47 CFR 15.507 - Marketing of UWB equipment.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 1 2012-10-01 2012-10-01 false Marketing of UWB equipment. 15.507 Section 15... Operation § 15.507 Marketing of UWB equipment. In some cases, the operation of UWB devices is limited to... state or local government. The marketing of UWB devices must be directed solely to parties eligible to...

  4. An on-line monitoring system for navigation equipment

    NASA Astrophysics Data System (ADS)

    Wang, Bo; Yang, Ping; Liu, Jing; Yang, Zhengbo; Liang, Fei

    2017-10-01

    Civil air navigation equipment is the most important infrastructure of Civil Aviation, which is closely related to flight safety. In addition to regular flight inspection, navigation equipment's patrol measuring, maintenance measuring, running measuring under special weather conditions are the important means of ensuring aviation flight safety. According to the safety maintenance requirements of Civil Aviation Air Traffic Control navigation equipment, this paper developed one on-line monitoring system with independent intellectual property rights for navigation equipment, the system breakthroughs the key technologies of measuring navigation equipment on-line including Instrument Landing System (ILS) and VHF Omni-directional Range (VOR), which also meets the requirements of navigation equipment ground measurement set by the ICAO DOC 8071, it provides technical means of the ground on-line measurement for navigation equipment, improves the safety of navigation equipment operation, and reduces the impact of measuring navigation equipment on airport operation.

  5. The first private-hospital based proton therapy center in Korea; status of the Proton Therapy Center at Samsung Medical Center.

    PubMed

    Chung, Kwangzoo; Han, Youngyih; Kim, Jinsung; Ahn, Sung Hwan; Ju, Sang Gyu; Jung, Sang Hoon; Chung, Yoonsun; Cho, Sungkoo; Jo, Kwanghyun; Shin, Eun Hyuk; Hong, Chae-Seon; Shin, Jung Suk; Park, Seyjoon; Kim, Dae-Hyun; Kim, Hye Young; Lee, Boram; Shibagaki, Gantaro; Nonaka, Hideki; Sasai, Kenzo; Koyabu, Yukio; Choi, Changhoon; Huh, Seung Jae; Ahn, Yong Chan; Pyo, Hong Ryull; Lim, Do Hoon; Park, Hee Chul; Park, Won; Oh, Dong Ryul; Noh, Jae Myung; Yu, Jeong Il; Song, Sanghyuk; Lee, Ji Eun; Lee, Bomi; Choi, Doo Ho

    2015-12-01

    The purpose of this report is to describe the proton therapy system at Samsung Medical Center (SMC-PTS) including the proton beam generator, irradiation system, patient positioning system, patient position verification system, respiratory gating system, and operating and safety control system, and review the current status of the SMC-PTS. The SMC-PTS has a cyclotron (230 MeV) and two treatment rooms: one treatment room is equipped with a multi-purpose nozzle and the other treatment room is equipped with a dedicated pencil beam scanning nozzle. The proton beam generator including the cyclotron and the energy selection system can lower the energy of protons down to 70 MeV from the maximum 230 MeV. The multi-purpose nozzle can deliver both wobbling proton beam and active scanning proton beam, and a multi-leaf collimator has been installed in the downstream of the nozzle. The dedicated scanning nozzle can deliver active scanning proton beam with a helium gas filled pipe minimizing unnecessary interactions with the air in the beam path. The equipment was provided by Sumitomo Heavy Industries Ltd., RayStation from RaySearch Laboratories AB is the selected treatment planning system, and data management will be handled by the MOSAIQ system from Elekta AB. The SMC-PTS located in Seoul, Korea, is scheduled to begin treating cancer patients in 2015.

  6. Blinks, saccades, and fixation pauses during vigilance task performance. I., Time on task.

    DOT National Transportation Integrated Search

    1994-12-01

    In the future, operators of complex equipment will spend more time monitoring computer controlled devices rather than having hands on control of such equipment. The operator intervenes in system operation under "unusual" conditions or when there is a...

  7. 77 FR 26356 - Petition for Waiver of Compliance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-03

    ... Order Procedures: Railroad Track, Locomotive and Equipment; 217, Railroad Operating Rules; 218, Railroad Operating Practices; 229, Railroad Locomotive Safety Standards; 233, Signal Systems Reporting Requirements... requiring special notice for repairs. Waiver is also sought for non-I-ETMS-equipped locomotives operating in...

  8. 40 CFR 63.9565 - What definitions apply to this subpart?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... limitation (including any operating limit) in this subpart during startup, shutdown, or malfunction.... Examples include hexane, toluene, and trichloroethylene. Initial startup means the first time that equipment is put into operation. Initial startup does not include operation solely for testing equipment...

  9. 40 CFR 63.9565 - What definitions apply to this subpart?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... limitation (including any operating limit) in this subpart during startup, shutdown, or malfunction.... Examples include hexane, toluene, and trichloroethylene. Initial startup means the first time that equipment is put into operation. Initial startup does not include operation solely for testing equipment...

  10. 40 CFR 63.9565 - What definitions apply to this subpart?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... limitation (including any operating limit) in this subpart during startup, shutdown, or malfunction.... Examples include hexane, toluene, and trichloroethylene. Initial startup means the first time that equipment is put into operation. Initial startup does not include operation solely for testing equipment...

  11. 40 CFR 63.9565 - What definitions apply to this subpart?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... limitation (including any operating limit) in this subpart during startup, shutdown, or malfunction.... Examples include hexane, toluene, and trichloroethylene. Initial startup means the first time that equipment is put into operation. Initial startup does not include operation solely for testing equipment...

  12. 30 CFR 57.14103 - Operators' stations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Equipment Safety Devices and Maintenance Requirements § 57.14103 Operators' stations. (a) If windows are provided on operators' stations of self-propelled mobile equipment, the windows shall be made of safety glass or material with equivalent safety characteristics. The windows shall be maintained to provide...

  13. 25 CFR 39.1200 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... School Operation and Maintenance Fund § 39.1200 Definitions. Contract school operation and maintenance costs for fiscal year 1979 means the sum of costs for custodial salaries and fringe benefits, related supplies and equipment and equipment repair, insurance, and school operation utilities costs, where such...

  14. TU-G-201-00: Imaging Equipment Specification and Selection in Radiation Oncology Departments

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This session will update therapeutic physicists on technological advancements and radiation oncology features of commercial CT, MRI, and PET/CT imaging systems. Also described are physicists’ roles in every stage of equipment selection, purchasing, and operation, including defining specifications, evaluating vendors, making recommendations, and optimal and safe use of imaging equipment in radiation oncology environment. The first presentation defines important terminology of CT and PET/CT followed by a review of latest innovations, such as metal artifact reduction, statistical iterative reconstruction, radiation dose management, tissue classification by dual energy CT and spectral CT, improvement in spatial resolution and sensitivity in PET, andmore » potentials of PET/MR. We will also discuss important technical specifications and items in CT and PET/CT purchasing quotes and their impacts. The second presentation will focus on key components in the request for proposal for a MRI simulator and how to evaluate vendor proposals. MRI safety issues in radiation Oncology, including MRI scanner Zones (4-zone design), will be discussed. Basic MR terminologies, important functionalities, and advanced features, which are relevant to radiation therapy, will be discussed. In the third presentation, justification of imaging systems for radiation oncology, considerations in room design and construction in a RO department, shared use with diagnostic radiology, staffing needs and training, clinical/research use cases and implementation, will be discussed. The emphasis will be on understanding and bridging the differences between diagnostic and radiation oncology installations, building consensus amongst stakeholders for purchase and use, and integrating imaging technologies into the radiation oncology environment. Learning Objectives: Learn the latest innovations of major imaging systems relevant to radiation therapy Be able to describe important technical specifications of CT, MRI, and PET/CT Understand the process of budget request, equipment justification, comparisons of technical specifications, site visits, vendor selection, and contract development.« less

  15. Equipment Efficiency for Healthy School Meals. [Videotape].

    ERIC Educational Resources Information Center

    National Food Service Management Inst., University, MS.

    A satellite seminar on large-scale food production equipment discusses ways child nutrition personnel can maximize use of existing equipment, considers research related to use of existing equipment, explains plan reviews for equipment selection and purchase, and explores new equipment options. Examples illustrate use of planning or modernizing…

  16. Selecting seats for steel industry mobile machines based on seat effective amplitude transmissibility and comfort.

    PubMed

    Conrad, Leanne F; Oliver, Michele L; Jack, Robert J; Dickey, James P; Eger, Tammy R

    2014-01-01

    The purpose of this work was to help a steel industry partner select the most appropriate of three high end heavy equipment seats to retrofit a number of their heavy mobile machines used in the steel making process. The participants included 8 males (22.3 ± 2.0 yrs.) and 8 females (23.5 ± 1.8 yrs.) with no experience operating heavy mobile equipment. Previously recorded 6-DOF chassis acceleration data from a Pot Hauler (a machine which picks up and transports pots of slag) were used to extract six, 20 second representative profiles for implementation on a lab-based heavy machine simulator (6-DOF Parallel Robotics System Corporation robot). Subjects sat on three heavy equipment seats (BeGe7150, Grammar MSG 95G1721, and a 6801 Isringhausen with the seat pan cushion retrofitted with a Skydex cushion) mounted on the simulator. Each subject completed three trials for each combination of seat (n=3) and vibration profile (n=6). Chassis and operator/seat interface vibration were measured by 2, 6-DOF vibration transducers. Variables included Seat Effective Amplitude Transmissibility (SEAT) (X,Y,Z,Roll,Pitch,Yaw,6DOF Vector Sum) to determine if the seat was attenuating or amplifying the vibration, 6-degree of freedom (DOF) vibration total value weighted predicted comfort (Avc) (according to ISO 2631-1) and operator reported comfort (ORC). Factorial ANOVAs revealed significant differences (p < or = 0.05) between seats for all SEAT variables but different seats performed better than others depending on the axis. Significant differences between males and females were observed for SEAT in X,Y, and Pitch as well as for Avs. As expected there were significant differences between vibration profiles for all assessed variables. A number of interaction effects were observed, the most frequently occurring of which was between seat and vibration profile. Based upon the number of seat and vibration profile interactions, results suggest that a single seat is not suited for all tested conditions. However, SEAT values for all of the seats tested were extremely low (e.g., 6-DOF SEAT < 30%) indicating that all of the seats were capable of providing good vibration attenuation.

  17. The Gunite and Associated Tanks Remediation Project Tank Waste Retrieval Performance and Lessons Learned, vol. 1 [of 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lewis, BE

    2003-10-07

    The Gunite and Associated Tanks (GAAT) Remediation Project was the first of its kind performed in the United States. Robotics and remotely operated equipment were used to successfully transfer almost 94,000 gal of remote-handled transuranic sludge containing over 81,000 Ci of radioactive contamination from nine large underground storage tanks at the Oak Ridge National Laboratory (ORNL). The sludge was transferred with over 439,000 gal of radioactive waste supernatant and {approx}420,500 gal of fresh water that was used in sluicing operations. The GAATs are located in a high-traffic area of ORNL near a main thoroughfare. A phased and integrated approach tomore » waste retrieval operations was used for the GAAT Remediation Project. The project promoted safety by obtaining experience from low-risk operations in the North Tank Farm before moving to higher-risk operations in the South Tank Farm. This approach allowed project personnel to become familiar with the tanks and waste, as well as the equipment, processes, procedures, and operations required to perform successful waste retrieval. By using an integrated approach to tank waste retrieval and tank waste management, the project was completed years ahead of the original baseline schedule, which resulted in avoiding millions of dollars in associated costs. This report is organized in two volumes. Volume 1 provides information on the various phases of the GAAT Remediation Project. It also describes the different types of equipment and how they were used. The emphasis of Volume 1 is on the description of the tank waste retrieval performance and the lessons learned during the GAAT Remediation Project. Volume 2 provides the appendixes for the report, which include the following information: (A) Background Information for the Gunite and Associated Tanks Operable Unit; (B) Annotated Bibliography; (C) Comprehensive Listing of the Sample Analysis Data from the GAAT Remediation Project; (D) GAAT Equipment Matrix; and (E) Vendor List for the GAAT Remediation Project. The remediation of the GAATs was completed {approx}5.5 years ahead of schedule and {approx}$120,435,000 below the cost estimated in the Remedial Investigation/Feasibility Study for the project. These schedule and cost savings were a direct result of the selection and use of state-of-the-art technologies and the dedication and drive of the engineers, technicians, managers, craft workers, and support personnel that made up the GAAT Remediation Project Team.« less

  18. Lightweight uncooled TWS equipped with catadioptric optics and microscan mechanism

    NASA Astrophysics Data System (ADS)

    Bergeron, A.; Jerominek, H.; Doucet, M.; Lagacé, F.; Desnoyers, N.; Bernier, S.; Mercier, L.; Boucher, M.-A.; Jacob, M.; Alain, C.; Pope, T. D.; Laou, P.

    2006-05-01

    A rugged lightweight thermal weapon sight (TWS) prototype was developed at INO in collaboration with DRDC-Valcartier. This TWS model is based on uncooled bolometer technology, ultralight catadioptric optics, ruggedized mechanics and electronics, and extensive onboard processing capabilities. The TWS prototype operates in a single 8-12 μm infrared (IR) band. It is equipped with a unique lightweight athermalized catadioptric objective and a bolometric IR imager with an INO focal plane array (FPA). Microscan technology allows the use of a 160 x 120 pixel FPA with a pitch of 50 μm to achieve a 320 × 240 pixel resolution image thereby avoiding the size (larger optics) and cost (expensive IR optical components) penalties associated with the use of larger format arrays. The TWS is equipped with a miniature shutter for automatic offset calibration. Based on the operation of the FPA at 100 frames per second (fps), real-time imaging with 320 x 240 pixel resolution at 25 fps is available. This TWS is also equipped with a high resolution (857 x 600 pixels) OLED color microdisplay and an integrated wireless digital RF link. The sight has an adjustable and selectable electronic reticule or crosshair (five possible reticules) and a manual focus from 5 m to infinity standoff distance. Processing capabilities are added to introduce specific functionalities such as image inversion (black hot and white hot), image enhancement, and pixel smoothing. This TWS prototype is very lightweight (~ 1100 grams) and compact (volume of 93 cubic inches). It offers human size target detection at 800 m and recognition at 200 m (Johnson criteria). With 6 Li AA batteries, it operates continuously for 5 hours and 20 minutes at room temperature. It can operate over the temperature range of -30 °C to +40 °C and its housing is completely sealed. The TWS is adapted to weaver or Picatinny rail mounting. The overall design of the TWS prototype is based on feedbacks of users to achieve improved user-friendly (e.g. no pull-down menus and no electronic focusing) and ergonomic (e.g. locations of buttons) features.

  19. Evaluation of the Kloswall longwall mining system

    NASA Astrophysics Data System (ADS)

    Guay, P. J.

    1982-04-01

    A new longwal mining system specifically designed to extract a very deep web (48 inches or deeper) from a longwall panel was studied. Productivity and cost analysis comparing the new mining system with a conventional longwall operation taking a 30 inch wide web is presented. It is shown that the new system will increase annual production and return on investment in most cases. Conceptual drawings and specifications for a high capacity three drum shearer and a unique shield type of roof support specifically designed for very wide web operation are reported. The advantages and problems associated with wide web mining in general and as they relate specifically to the equipment selected for the new mining system are discussed.

  20. Equipment characterization to mitigate risks during transfers of cell culture manufacturing processes.

    PubMed

    Sieblist, Christian; Jenzsch, Marco; Pohlscheidt, Michael

    2016-08-01

    The production of monoclonal antibodies by mammalian cell culture in bioreactors up to 25,000 L is state of the art technology in the biotech industry. During the lifecycle of a product, several scale up activities and technology transfers are typically executed to enable the supply chain strategy of a global pharmaceutical company. Given the sensitivity of mammalian cells to physicochemical culture conditions, process and equipment knowledge are critical to avoid impacts on timelines, product quantity and quality. Especially, the fluid dynamics of large scale bioreactors versus small scale models need to be described, and similarity demonstrated, in light of the Quality by Design approach promoted by the FDA. This approach comprises an associated design space which is established during process characterization and validation in bench scale bioreactors. Therefore the establishment of predictive models and simulation tools for major operating conditions of stirred vessels (mixing, mass transfer, and shear force.), based on fundamental engineering principles, have experienced a renaissance in the recent years. This work illustrates the systematic characterization of a large variety of bioreactor designs deployed in a global manufacturing network ranging from small bench scale equipment to large scale production equipment (25,000 L). Several traditional methods to determine power input, mixing, mass transfer and shear force have been used to create a data base and identify differences for various impeller types and configurations in operating ranges typically applied in cell culture processes at manufacturing scale. In addition, extrapolation of different empirical models, e.g. Cooke et al. (Paper presented at the proceedings of the 2nd international conference of bioreactor fluid dynamics, Cranfield, UK, 1988), have been assessed for their validity in these operational ranges. Results for selected designs are shown and serve as examples of structured characterization to enable fast and agile process transfers, scale up and troubleshooting.

  1. What is the cost per millimetre? Challenging traditional GNSS equipment for precise geosciences and engineering applications

    NASA Astrophysics Data System (ADS)

    Hogg, William; Boreham, Nicholas; Benedetti, Elisa; Roberts, William

    2017-04-01

    Surveyors, civil and geotechnical engineers are the typical users of professional grade GNSS receiver that is capable of achieving positioning accuracies of sub-centimetre and navigation accuracies of 1-2cm. When choosing the equipment for their needs, they are often faced with a dilemma with each additional frequency, constellation and feature coming at a cost, resulting in professional GNSS equipment being regarded as high-priced specialist equipment. Indeed there are many users that have discounted GNSS on the grounds that it is too expensive and too operationally complex to warrant purchase. Having identified this situation, Nottingham Scientific Ltd (NSL) set about the development of equipment that would break down this barrier making high accuracy GNSS affordable to new users and applications and more cost effective to existing users. NSL created "STICK" which is a single frequency, multi-constellation, IMU-integrated GNSS sensor for precise movement detection of the natural and built environments and infrastructures, at approximately 1/20th of the price of a professional grade GNSS system. STICK has been developed within the context of three European Space Agency (ESA) Integrated Applications Programme Demonstration projects that use space assets to monitor the land stability and the status of different types of infrastructure, each with its own operational challenges. However through the careful selection of components, the implementation of certain operational constraints and the use of advanced statistical data processing, sub-centimetre positioning can be achieved for monitoring purposes. This paper describes STICK, the applications for which it has been developed, and the environments within which it is operating. We then explore the performance by directly comparing STICK to geodetic GNSS receivers setup in an operational, test bed environment. This test bed allows the receivers/antennas to be subjected to a three-dimensional displacement in the order of 1cm a day. The processing techniques that are used by the STICK monitoring service are described, including the GNSS data processing, the integration of IMU and the statistical analyses used to detect, quantify and report movement. By considering operational cost in terms of power, installation difficulty, remote communication and processing complexity and along with device price, we summarize the final cost to the user. Comparisons with other GNSS solutions shows whether cost truly scales with accuracy and precision. Benedetti E., L. Brack, W. Roberts, Performance Validation of Low-Cost GNSS Sensors for Land Monitoring and Hazard Mitigation, Paper presented at ION GNSS+ 2016 Session F4: Land-Based Applications 2, ION GNSS+ 2016 Proceedings (In Press) Roberts W., E. Benedetti, M. Hutchinson, G. Phipps and A. Keal, An Expendable GNSS Sensor for the Continuous Monitoring and Risk Profiling of Land and Infrastructure, Presentation at ION GNSS+ 2015 Session A5: Applications Using Consumer GNSS

  2. The automatic control system and stand-by facilities of the TDMA-40 equipment

    NASA Astrophysics Data System (ADS)

    Gudenko, D. V.; Pankov, G. Kh.; Pauk, A. G.; Tsirlin, V. M.

    1980-10-01

    When a controlling station in a satellite communications system is out of order, a complex algorithm must be carried out for automatic operation of the stand-by equipment. A processor has been developed to perform this algorithm, as well as operations involving the stand-by facilities of the receiving-transmitting equipment of the station. The design principles and solutions to problems in developing the equipment for the monitoring and controlling systems are described. These systems are based on multistation access using time division multiplexing. Algorithms are presented for the operation of the synchronizing processor and the control processor of the equipment. The automatic control system and stand-by facilities make it possible to reduce the service personnel and to design an unattended station.

  3. Self-management interventions: Proposal and validation of a new operational definition.

    PubMed

    Jonkman, Nini H; Schuurmans, Marieke J; Jaarsma, Tiny; Shortridge-Baggett, Lillie M; Hoes, Arno W; Trappenburg, Jaap C A

    2016-12-01

    Systematic reviews on complex interventions like self-management interventions often do not explicitly state an operational definition of the intervention studied, which may impact the review's conclusions. This study aimed to propose an operational definition of self-management interventions and determine its discriminative performance compared with other operational definitions. Systematic review of definitions of self-management interventions and consensus meetings with self-management research experts and practitioners. Self-management interventions were defined as interventions that aim to equip patients with skills to actively participate and take responsibility in the management of their chronic condition in order to function optimally through at least knowledge acquisition and a combination of at least two of the following: stimulation of independent sign/symptom monitoring, medication management, enhancing problem-solving and decision-making skills for medical treatment management, and changing their physical activity, dietary, and/or smoking behavior. This definition substantially reduced the number of selected studies (255 of 750). In two preliminary expert meetings (n = 6), the proposed definition was identifiable for self-management research experts and practitioners (80% and 60% agreement, respectively). Future systematic reviews must carefully consider the operational definition of the intervention studied because the definition influences the selection of studies on which conclusions and recommendations for clinical practice are based. Copyright © 2016 Elsevier Inc. All rights reserved.

  4. 46 CFR 153.484 - Prewash equipment.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... BULK LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Design and Equipment for Pollution Control § 153.484 Prewash equipment. Unless the ship operator shows that the prewash...

  5. 46 CFR 153.484 - Prewash equipment.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... BULK LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Design and Equipment for Pollution Control § 153.484 Prewash equipment. Unless the ship operator shows that the prewash...

  6. 46 CFR 153.484 - Prewash equipment.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... BULK LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Design and Equipment for Pollution Control § 153.484 Prewash equipment. Unless the ship operator shows that the prewash...

  7. 46 CFR 153.484 - Prewash equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... BULK LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Design and Equipment for Pollution Control § 153.484 Prewash equipment. Unless the ship operator shows that the prewash...

  8. 46 CFR 153.484 - Prewash equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... BULK LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Design and Equipment for Pollution Control § 153.484 Prewash equipment. Unless the ship operator shows that the prewash...

  9. Autonomous Integrated Receive System (AIRS) requirements definition. Volume 3: Performance and simulation

    NASA Technical Reports Server (NTRS)

    Chie, C. M.; Su, Y. T.; Lindsey, W. C.; Koukos, J.

    1984-01-01

    The autonomous and integrated aspects of the operation of the AIRS (Autonomous Integrated Receive System) are discussed from a system operation point of view. The advantages of AIRS compared to the existing SSA receive chain equipment are highlighted. The three modes of AIRS operation are addressed in detail. The configurations of the AIRS are defined as a function of the operating modes and the user signal characteristics. Each AIRS configuration selection is made up of three components: the hardware, the software algorithms and the parameters used by these algorithms. A comparison between AIRS and the wide dynamics demodulation (WDD) is provided. The organization of the AIRS analytical/simulation software is described. The modeling and analysis is for simulating the performance of the PN subsystem is documented. The frequence acquisition technique using a frequency-locked loop is also documented. Doppler compensation implementation is described. The technological aspects of employing CCD's for PN acquisition are addressed.

  10. Poster - Thur Eve - 02: Regulatory oversight of the robotic radiosurgery facilities.

    PubMed

    Broda, K

    2012-07-01

    Following a recent review of the Class II Nuclear Facilities and Prescribed Equipment Regulations and regulatory oversight of particle accelerators, the Canadian Nuclear Safety Commission (CNSC) has changed its policy concerning the regulation of particle accelerators. In November 2011, the CNSC began to exercise its regulatory authority with respect to all particle accelerators operating at a beam energy of 1 (one) MeV or greater. The CNSC already licences and inspects particle accelerators capable of operating at or above 10 MeV. The decision to now include low energy particle accelerators (i.e., those operating at or above 1 MeV) ensures adequate, uniform and consistent regulatory oversight for all Class II accelerators. The CNSC expects these facilities to comply with CNSC requirements by December 2013. Besides conventional linear accelerators of lower energy (6 MeV or below) typically found in cancer clinics, two types of equipment now fall under the CNSC's regulatory oversight as a result of the above change: robotic radiosurgery and tomotherapy equipment and facilities. A number of clinics in Canada already operates these types of equipment and facilities. The safety aspects of radiosurgery equipment differ slightly from those for conventional linear accelerators. This poster aims to present an approach taken by the CNSC to regulate robotic radiosurgery equipment and facilities. The presentation will explain how to meet regulatory requirements of the Class II Nuclear Facilities and Prescribed Equipment Regulations by licensees operating or planning to acquire these types of equipment and facilities. © 2012 American Association of Physicists in Medicine.

  11. 46 CFR 108.655 - Operating instructions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Operating instructions. 108.655 Section 108.655 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS DESIGN AND EQUIPMENT Equipment Markings and Instructions § 108.655 Operating instructions. Each unit must have posters...

  12. 46 CFR 108.655 - Operating instructions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Operating instructions. 108.655 Section 108.655 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS DESIGN AND EQUIPMENT Equipment Markings and Instructions § 108.655 Operating instructions. Each unit must have posters...

  13. 46 CFR 108.655 - Operating instructions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Operating instructions. 108.655 Section 108.655 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS DESIGN AND EQUIPMENT Equipment Markings and Instructions § 108.655 Operating instructions. Each unit must have posters...

  14. 46 CFR 108.655 - Operating instructions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Operating instructions. 108.655 Section 108.655 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS DESIGN AND EQUIPMENT Equipment Markings and Instructions § 108.655 Operating instructions. Each unit must have posters...

  15. 46 CFR 108.655 - Operating instructions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Operating instructions. 108.655 Section 108.655 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS DESIGN AND EQUIPMENT Equipment Markings and Instructions § 108.655 Operating instructions. Each unit must have posters...

  16. 47 CFR 64.702 - Furnishing of enhanced services and customer-premises equipment.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... separate operating, marketing, installation, and maintenance personnel, and utilize separate computer... available to the separate corporation any capacity or computer system component on its computer system or... Enhanced Services and Customer-Premises Equipment by Bell Operating Companies; Telephone Operator Services...

  17. 47 CFR 64.702 - Furnishing of enhanced services and customer-premises equipment.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... separate operating, marketing, installation, and maintenance personnel, and utilize separate computer... available to the separate corporation any capacity or computer system component on its computer system or... Enhanced Services and Customer-Premises Equipment by Bell Operating Companies; Telephone Operator Services...

  18. 47 CFR 64.702 - Furnishing of enhanced services and customer-premises equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... separate operating, marketing, installation, and maintenance personnel, and utilize separate computer... available to the separate corporation any capacity or computer system component on its computer system or... Enhanced Services and Customer-Premises Equipment by Bell Operating Companies; Telephone Operator Services...

  19. 47 CFR 64.702 - Furnishing of enhanced services and customer-premises equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... separate operating, marketing, installation, and maintenance personnel, and utilize separate computer... available to the separate corporation any capacity or computer system component on its computer system or... Enhanced Services and Customer-Premises Equipment by Bell Operating Companies; Telephone Operator Services...

  20. 47 CFR 64.702 - Furnishing of enhanced services and customer-premises equipment.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... separate operating, marketing, installation, and maintenance personnel, and utilize separate computer... available to the separate corporation any capacity or computer system component on its computer system or... Enhanced Services and Customer-Premises Equipment by Bell Operating Companies; Telephone Operator Services...

  1. Methods for Monitoring Fish Communities of Buffalo National River and Ozark National Scenic Riverways in the Ozark Plateaus of Arkansas and Missouri: Version 1.0

    USGS Publications Warehouse

    Petersen, James C.; Justus, B.G.; Dodd, H.R.; Bowles, D.E.; Morrison, L.W.; Williams, M.H.; Rowell, G.A.

    2008-01-01

    Buffalo National River located in north-central Arkansas, and Ozark National Scenic Riverways, located in southeastern Missouri, are the two largest units of the National Park Service in the Ozark Plateaus physiographic province. The purpose of this report is to provide a protocol that will be used by the National Park Service to sample fish communities and collect related water-quality, habitat, and stream discharge data of Buffalo National River and Ozark National Scenic Riverways to meet inventory and long-term monitoring objectives. The protocol includes (1) a protocol narrative, (2) several standard operating procedures, and (3) supplemental information helpful for implementation of the protocol. The protocol narrative provides background information about the protocol such as the rationale of why a particular resource or resource issue was selected for monitoring, information concerning the resource or resource issue of interest, a description of how monitoring results will inform management decisions, and a discussion of the linkages between this and other monitoring projects. The standard operating procedures cover preparation, training, reach selection, water-quality sampling, fish community sampling, physical habitat collection, measuring stream discharge, equipment maintenance and storage, data management and analysis, reporting, and protocol revision procedures. Much of the information in the standard operating procedures was gathered from existing protocols of the U.S. Geological Survey National Water Quality Assessment program or other sources. Supplemental information that would be helpful for implementing the protocol is included. This information includes information on fish species known or suspected to occur in the parks, sample sites, sample design, fish species traits, index of biotic integrity metrics, sampling equipment, and field forms.

  2. 7 CFR 550.35 - Rules of the workplace.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... the REE Agency's facilities, will abide by the Agency's standard operating procedures regarding the maintenance of laboratory notebooks, dissemination of information, equipment operation standards, hours of.... Equipment/Property Standards ...

  3. 7 CFR 550.35 - Rules of the workplace.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... the REE Agency's facilities, will abide by the Agency's standard operating procedures regarding the maintenance of laboratory notebooks, dissemination of information, equipment operation standards, hours of.... Equipment/Property Standards ...

  4. 7 CFR 550.35 - Rules of the workplace.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... the REE Agency's facilities, will abide by the Agency's standard operating procedures regarding the maintenance of laboratory notebooks, dissemination of information, equipment operation standards, hours of.... Equipment/Property Standards ...

  5. 7 CFR 550.35 - Rules of the workplace.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... the REE Agency's facilities, will abide by the Agency's standard operating procedures regarding the maintenance of laboratory notebooks, dissemination of information, equipment operation standards, hours of.... Equipment/Property Standards ...

  6. 7 CFR 550.35 - Rules of the workplace.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... the REE Agency's facilities, will abide by the Agency's standard operating procedures regarding the maintenance of laboratory notebooks, dissemination of information, equipment operation standards, hours of.... Equipment/Property Standards ...

  7. 40 CFR 60.3043 - What operating parameter monitoring equipment must I install, and what operating parameters must...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What operating parameter monitoring equipment must I install, and what operating parameters must I monitor? 60.3043 Section 60.3043 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emission...

  8. Repeatability of diagnostic ultrasonography in the assessment of the equine superficial digital flexor tendon.

    PubMed

    Pickersgill, C H; Marr, C M; Reid, S W

    2001-01-01

    A quantitative investigation of the variation that can occur during the course of ultrasonography of the equine superficial digital flexor tendons (SDFT) was undertaken. The aim of this investigation was to use an objective measure, namely the measurement of CSA, to quantify the variability occurring during the course of the ultrasonographic assessment of the equine SDFT. The effects of 3 variables on the CSA measurements were determined. 1) Image acquisition operator (IAc): two different operators undertaking the ultrasonographic examination; 2) image analysis operator (IAn): two different operators undertaking the calculation of CSA values from previously stored images; and 3) analytical equipment (used during CSA measurement) (IEq): the use of 2 different sets of equipment during calculation of CSA values. Tendon cross-sectional area (CSA) measurements were used as the comparative variable of 3 potential sources: interoperator, during image acquisition; interoperator, during CSA measurement; and intraoperator, when using different analytical equipment. Two operators obtained transverse ultrasonographic images from the forelimb SDFTs of 16 National Hunt (NH) Thoroughbred (TB) racehorses, each undertaking analysis of their own and the other operator's images. One operator undertook analysis of their images using 2 sets of equipment. There was no statistically significant difference in the results obtained when different operators undertook image acquisition (P>0.05). At all but the most distal level, there was no significant difference when different equipment was used during analysis (P>0.05). A significant difference (P<0.01) was reported when different operators undertook image analysis, one operator consistently returning larger measurements. Different operators undertaking different stages of an examination can result in significant variability. To reduce confounding during ultrasonographic investigations involving multiple persons, one operator should undertake image analysis, although different operators may undertake image acquisition.

  9. The Effects of the Joint Multi-Mission Electro-Optical System on Littoral Maritime Intelligence, Surveillance, and Reconnaissance Operations

    DTIC Science & Technology

    2009-09-01

    though other variants can also deploy and operate from an aircraft carrier as well. While the SH-60B is equipped with a towed Magnetic Anomaly...for the scope of this thesis, the JMMES system utilized was not equipped with a MAD sensor and the operator workstation was onboard the aircraft ...investigates how a JMMES equipped SH-60 variant aircraft affects U.S. ISR capabilities in the littoral regions, specifically in the areas of Anti

  10. 18 CFR 367.3980 - Account 398, Miscellaneous equipment.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... service company's operations that are not included in any other account of this system of accounts. (b... equipment. (3) Employees' recreation equipment. (4) Radios. (5) Restaurant equipment. (6) Soda fountains. (7...

  11. 29 CFR 1926.1417 - Operation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Cranes and Derricks in Construction § 1926.1417 Operation...) Swinging locomotive cranes. A locomotive crane must not be swung into a position where railway cars on an... applies to equipment other than tower cranes: (i) Equipment must not be operated without the counterweight...

  12. 40 CFR 265.195 - Inspections.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... of hazardous waste (e.g., wet spots, dead vegetation). (c) Owners or operators of tank systems that... operating day, data gathered from monitoring and leak detection equipment (e.g., pressure or temperature... must inspect at least once each operating day: (1) Overfill/spill control equipment (e.g., waste-feed...

  13. 40 CFR 265.195 - Inspections.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... of hazardous waste (e.g., wet spots, dead vegetation). (c) Owners or operators of tank systems that... operating day, data gathered from monitoring and leak detection equipment (e.g., pressure or temperature... must inspect at least once each operating day: (1) Overfill/spill control equipment (e.g., waste-feed...

  14. 40 CFR 265.195 - Inspections.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... of hazardous waste (e.g., wet spots, dead vegetation). (c) Owners or operators of tank systems that... operating day, data gathered from monitoring and leak detection equipment (e.g., pressure or temperature... must inspect at least once each operating day: (1) Overfill/spill control equipment (e.g., waste-feed...

  15. 40 CFR 265.195 - Inspections.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... of hazardous waste (e.g., wet spots, dead vegetation). (c) Owners or operators of tank systems that... operating day, data gathered from monitoring and leak detection equipment (e.g., pressure or temperature... must inspect at least once each operating day: (1) Overfill/spill control equipment (e.g., waste-feed...

  16. 40 CFR 265.195 - Inspections.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... of hazardous waste (e.g., wet spots, dead vegetation). (c) Owners or operators of tank systems that... operating day, data gathered from monitoring and leak detection equipment (e.g., pressure or temperature... must inspect at least once each operating day: (1) Overfill/spill control equipment (e.g., waste-feed...

  17. 78 FR 26110 - Kicking Cars and Going Between Rolling Equipment During Flat Switching Operations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ... Cars and Going Between Rolling Equipment During Flat Switching Operations AGENCY: Federal Railroad... occurred during a railroad switching operation that involved a railroad employee kicking cars and... make recommendations to railroads regarding the adoption of car-handling procedures during flat...

  18. 14 CFR 29.1333 - Instrument systems.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    .... For systems that operate the required flight instruments which are located at each pilot's station... that operating system. (b) The equipment, systems, and installations must be designed so that one... equipment may not be connected to the operating system for a second pilot unless provisions are made to...

  19. 14 CFR 29.1333 - Instrument systems.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    .... For systems that operate the required flight instruments which are located at each pilot's station... that operating system. (b) The equipment, systems, and installations must be designed so that one... equipment may not be connected to the operating system for a second pilot unless provisions are made to...

  20. 14 CFR 29.1333 - Instrument systems.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    .... For systems that operate the required flight instruments which are located at each pilot's station... that operating system. (b) The equipment, systems, and installations must be designed so that one... equipment may not be connected to the operating system for a second pilot unless provisions are made to...

Top